WorldWideScience

Sample records for vacuum system refurbishing

  1. Refurbishment and Automation of Thermal Vacuum Facilities at NASA/GSFC

    Science.gov (United States)

    Dunn, Jamie; Gomez, Carlos; Donohue, John; Johnson, Chris; Palmer, John; Sushon, Janet

    1999-01-01

    The thermal vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the eleven facilities, currently ten of the systems are scheduled for refurbishment or replacement as part of a five-year implementation. Expected return on investment includes the reduction in test schedules, improvements in safety of facility operations, and reduction in the personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering, and for the automation of thermal vacuum facilities and tests. Automation of the thermal vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs), the use of Supervisory Control and Data Acquisition (SCADA) systems, and the development of a centralized Test Data Management System. These components allow the computer control and automation of mechanical components such as valves and pumps. The project of refurbishment and automation began in 1996 and has resulted in complete computer control of one facility (Facility 281), and the integration of electronically controlled devices and PLCs in multiple others.

  2. Refurbishment and Automation of the Thermal/Vacuum Facilities at the Goddard Space Flight Center

    Science.gov (United States)

    Donohue, John T.; Johnson, Chris; Ogden, Rick; Sushon, Janet

    1998-01-01

    The thermal/vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the 11 facilities, currently 10 of the systems are scheduled for refurbishment and/or replacement as part of a 5-year implementation. Expected return on investment includes the reduction in test schedules, improvements in the safety of facility operations, reduction in the complexity of a test and the reduction in personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering and for the automation of thermal/vacuum facilities and thermal/vacuum tests. Automation of the thermal/vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs) and the use of Supervisory Control and Data Acquisition (SCADA) systems. These components allow the computer control and automation of mechanical components such as valves and pumps. In some cases, the chamber and chamber shroud require complete replacement while others require only mechanical component retrofit or replacement. The project of refurbishment and automation began in 1996 and has resulted in the computer control of one Facility (Facility #225) and the integration of electronically controlled devices and PLCs within several other facilities. Facility 225 has been successfully controlled by PLC and SCADA for over one year. Insignificant anomalies have occurred and were resolved with minimal impact to testing and operations. The amount of work remaining to be performed will occur over the next four to five years. Fiscal year 1998 includes the complete refurbishment of one facility, computer control of the thermal systems in two facilities, implementation of SCADA and PLC systems to support multiple facilities and the implementation of a Database server to allow efficient test management and data analysis.

  3. Vacuuming and drying during refurbishment, Task 3.08/04-11; Podzadatak 3.08/04-11 Vakuumiranje i susenje u toku remonta

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Crnilovic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    The following tasks were completed during RA reactor refurbishment: vacuuming the gas system; vacuuming of the heavy water system for collecting the leftover heavy water; drying the heavy water system to remove the demineralized water; drying the distillation system; vacuuming the heavy water system before filling with heavy water; leak testing of the complete reactor system.

  4. Refurbishment of the reactor protection system at Paks NPP. The refurbishment process

    International Nuclear Information System (INIS)

    Turi, T.; Katics, B.

    1998-01-01

    The Reactor Protection System Refurbishment Project had an extensive preparation period in Paks started in 1992. During this preparation a large volume of the basic engineering tasks has been performed and as a result a contract for implementation of a three-train digital RPS on the four Units was concluded with Siemens in September, 1996. According to that contract the first refurbished Unit will be commissioned in 1999 followed by a further Unit in each succeeding year. This paper introduces the process of the refurbishment, overview of the V and V activities, introduce the architecture, summarize the main design principles and outlines the additional tasks to be performed together with the RPS design. (author)

  5. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  6. Advanced instrumentation and control systems for CANDU refurbishment

    International Nuclear Information System (INIS)

    Sklyar, V.; Bakhmach, I.; Kharchenko, V.; Andrashov, A.; Baranova, O.

    2011-01-01

    The purpose of the work is to discuss opportunities to modernize I and C systems of CANDU reactors on the base of Radiy's digital safety platform. This paper discusses the following topics: a business model for CANDU, I and C systems refurbishment, FPGA technology issues, comparison of different approaches to refurbish obsolete I and C systems. (author)

  7. Refurbishment of the NPP Dukovany I and C System

    International Nuclear Information System (INIS)

    Karpeta, C.; Rosol, J.

    2004-01-01

    An overview of the NPP Dukovany Instrumentation and Control (I and C) refurbishment project is presented in this paper from the standpoint of both its management and technical aspects. Reasons for taking the decision to replace the original plant I and C system are outlined and the objectives set for the refurbishment project are stated. The paper is focusing on describing more in detail the first part of the refurbishment, i.e. replacement of the I and C portions of the plant systems important to nuclear safety and the process information system. This includes the reactor trip system, engineered safety features actuation system, reactor power limitation system, reactor power control system, post-accident monitoring system, reactor core monitoring system and unit data acquisition and processing system. Information is given on the main processes of the project, i.e. the bidding, design, manufacturing, installation and commissioning. Specific licensing process applied to this refurbishment project is also outlined. An account of the current status of the project implementation is given. (author)

  8. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities

  9. Reactor protection system refurbishment at Paks

    International Nuclear Information System (INIS)

    Hetzmann, A.; Turi, T.

    1997-01-01

    The history and the milestones of the reactor protection system refurbishment are outlined. During the preparation phase of the refurbishment project, detailed requirements have been set up and specific technical solutions developed. The structure of the project documents prepared during these activities is shown in a figure. The life cycle of the project was divided into four phases: the preparatory phase; the design and manufacturing phase; the installation and commissioning phase; and the operation phase. For all four Paks units a time schedule for implementation was set up. The licensing process is dealt with; the principal license was issued in June 1996. (A.K.)

  10. System impact of energy efficient building refurbishment within a district heated region

    International Nuclear Information System (INIS)

    Lidberg, T.; Olofsson, T.; Trygg, L.

    2016-01-01

    The energy efficiency of the European building stock needs to be increased in order to fulfill the climate goals of the European Union. To be able to evaluate the impact of energy efficient refurbishment in matters of greenhouse gas emissions, it is necessary to apply a system perspective where not only the building but also the surrounding energy system is taken into consideration. This study examines the impact that energy efficient refurbishment of multi-family buildings has on the district heating and the electricity production. It also investigates the impact on electricity utilization and emissions of greenhouse gases. The results from the simulation of four energy efficiency building refurbishment packages were used to evaluate the impact on the district heating system. The packages were chosen to show the difference between refurbishment actions that increase the use of electricity when lowering the heat demand, and actions that lower the heat demand without increasing the electricity use. The energy system cost optimization modeling tool MODEST (Model for Optimization of Dynamic Energy Systems with Time-Dependent Components and Boundary Conditions) was used. When comparing two refurbishment packages with the same annual district heating use, this study shows that a package including changes in the building envelope decreases the greenhouse gas emissions more than a package including ventilation measures. - Highlights: • Choice of building refurbishment measures leads to differences in system impact. • Building refurbishment in district heating systems reduces co-produced electricity. • Valuing biomass as a limited resource is crucial when assessing global GHG impact. • Building envelope measures decrease GHG (greenhouse gas) emissions more than ventilation measures.

  11. Thermal Vacuum Integrated System Test at B-2

    Science.gov (United States)

    Kudlac, Maureen T.; Weaver, Harold F.; Cmar, Mark D.

    2012-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Space Propulsion Research Facility, commonly referred to as B-2, is NASA s third largest thermal vacuum facility. It is the largest designed to store and transfer large quantities of liquid hydrogen and liquid oxygen, and is perfectly suited to support developmental testing of chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of large lightweight structures, Cryogenic Fluid Management (CFM) systems, electric propulsion test programs, and other In-Space propulsion programs. A recently completed integrated system test demonstrated the refurbished thermal vacuum capabilities of the facility. The test used the modernized data acquisition and control system to monitor the facility during pump down of the vacuum chamber, operation of the liquid nitrogen heat sink (or cold wall) and the infrared lamp array. A vacuum level of 1.3x10(exp -4)Pa (1x10(exp -6)torr) was achieved. The heat sink provided a uniform temperature environment of approximately 77 K (140deg R) along the entire inner surface of the vacuum chamber. The recently rebuilt and modernized infrared lamp array produced a nominal heat flux of 1.4 kW/sq m at a chamber diameter of 6.7 m (22 ft) and along 11 m (36 ft) of the chamber s cylindrical vertical interior. With the lamp array and heat sink operating simultaneously, the thermal systems produced a heat flux pattern simulating radiation to space on one surface and solar exposure on the other surface. The data acquired matched pretest predictions and demonstrated system functionality.

  12. Refurbishments of RF systems

    International Nuclear Information System (INIS)

    Baelde, J.L.

    1998-01-01

    This document describes the activities of the R.F. System group during the years 1995-1996 in the frame of the refurbishment of the control system at GANIL accelerator. Modifications concerning the following sub-assemblies are mentioned: 1. voltage standards; 2. link card between the step by step motor control and the local control systems; 3. polarization system; 4. computer software for different operations. Also reported is the installation of ECR 4 source for the CO2. In this period the R2 Regrouping system has been installed, tested and put into operation. Several problems concerning the mechanical installation of the coupling loop and other problems related to the electronics operation were solved. The results obtained with the THI machine are presented

  13. IEC 61850 based refurbishment strategies for protection and automation systems

    Energy Technology Data Exchange (ETDEWEB)

    Tholomier, D. [Areva T and D Automation Canada Inc., Monteal, PQ (Canada); Hossenlopp, L. [Areva T and D Automation Inc., Paris (France); Apostolov, A. [Omicron Electronics, Houston, TX (United States)

    2008-07-01

    Electric utilities are currently facing the challenge of refurbishing aging transmission networks and power system infrastructure at a time of severe economic, environmental and competitive constraints. This paper addressed the issue of an appropriate approach to retrofit the hardware and software of substation secondary systems, and how IEC standards could be used to set up a long term strategy. The first part of the paper considered an asset management strategy for refurbishing substation secondary systems, while the second part of the paper addressed the strategies for refurbishing existing power plants. The final section of the paper analyzed refurbishment strategies designed to protect power distribution systems. The impact of IEC 61850 and how legacy devices can be integrated in substation automation systems were discussed. It was concluded that new SCADA systems are needed to handle new technology. Additional features like remote control, remote settings, remote disturbance records analysis and remote maintenance are also needed to properly operate the power system. The value of preventive maintenance using remote monitoring systems to determine the status of all the digital electronic devices installed in substation was also discussed. IEC 61850 offers several opportunities to improve grid operation and control. It supports interoperability between protective relays and control devices from different manufacturers in the substation, which is required in order to achieve substation level interlocking, protection and control functions and improve the efficiency of microprocessor based relays applications. This technology has now passed the initial stage of implementation and several projects are underway worldwide. 13 figs.

  14. Water electrolysis system refurbishment and testing

    Science.gov (United States)

    Greenough, B. M.

    1972-01-01

    The electrolytic oxygen generator for the back-up water electrolysis system in a 90-day manned test was refurbished, improved and subjected to a 182-day bench test. The performance of the system during the test demonstrated the soundness of the basic electrolysis concept, the high development status of the automatic controls which allowed completely hands-off operation, and the capability for orbital operation. Some design improvements are indicated.

  15. E-waste Management and Refurbishment Prediction (EMARP) Model for Refurbishment Industries.

    Science.gov (United States)

    Resmi, N G; Fasila, K A

    2017-10-01

    This paper proposes a novel algorithm for establishing a standard methodology to manage and refurbish e-waste called E-waste Management And Refurbishment Prediction (EMARP), which can be adapted by refurbishing industries in order to improve their performance. Waste management, particularly, e-waste management is a serious issue nowadays. Computerization has been into waste management in different ways. Much of the computerization has happened in planning the waste collection, recycling and disposal process and also managing documents and reports related to waste management. This paper proposes a computerized model to make predictions for e-waste refurbishment. All possibilities for reusing the common components among the collected e-waste samples are predicted, thus minimizing the wastage. Simulation of the model has been done to analyse the accuracy in the predictions made by the system. The model can be scaled to accommodate the real-world scenario. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Refurbishment programs

    International Nuclear Information System (INIS)

    Irish, C.S.

    2004-01-01

    As nuclear plants age, equipment becomes obsolete, outdated or just simply unreliable. This puts a lot of emphasis on replacement of the subject equipment. This can be an expensive proposition for safety related equipment due to design changes, requalification charges and the cost of the new equipment, specifically when the original component is obsolete. The presentation will explain how comprehensive refurbishment programs on many different types of equipment can alleviate this situation. The refurbishment program is a systematic refurbishment of equipment to an as new condition by replacing all of the age sensitive components within the equipment. This is carried out on all of the same type of equipment in a scheduled program. For example the plant may to decide to refurbish all of their Lambda LME-24 power supplies, or all of their Bailey modules, or all of their Agastat DSC Series relays. Independent of the item the process is the same. Refurbish each piece of equipment to an as new condition by replacing all of the age sensitive equipment. The equipment is then returned to the client as safety related, existing qualification maintained and with a new service life/warranty. This is not a simple repair. It is a planned refurbishment to an as new condition of certain equipment types throughout the plant and then carried out from equipment piece to equipment piece. The refurbishment program may even include introducing new spares into the plant. This is normally performed by upgrading (dedicating for safety related use and refurbishing to an 'as new' condition) surplus equipment and using these equipment pieces in the rotation of the plant equipment to refurbish the entire population of a selected piece of equipment at the plant. This process can be performed on many equipment types including power supplies, circuit boards, modules, relays, motors, breakers, and many more. The refurbishment program greatly increases the reliability of the equipment without the

  17. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora (I-IX), VII Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities.

  18. LMZ experience in refurbishment of hydroturbine equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sotnikov, Anatoly A. [LMZ, St. Petersburg (Russian Federation). Div. of Hydraulic Machine

    2000-07-01

    AO LMZ experience in refurbishment of hydroturbine equipment is generalized. Hydraulic turbines of many power stations having been in service of more than 30 years need rehabilitation and modernization. As a rule, the following problems are solved in the process of refurbishment works: increase of turbine efficiency and output, ensuring of reliable operation of the equipment during the next length of life, ensuring the environmental safety of the equipment, furnishing of the power station with up to date automatic control systems. The process of refurbishment used by LMZ is described. The examples of refurbishment are given. (author)

  19. Integration of remote refurbishment performed on ITER components

    Energy Technology Data Exchange (ETDEWEB)

    Dammann, A., E-mail: alexis.dammann@iter.org [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Antola, L. [AMEC, 31 Parc du Golf, CS 90519, 13596 Aix en Provence (France); Beaudoin, V. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Dremel, C. [Westinghouse, Electrique France/Astare, 122 Avenue de Hambourg, 13008 Marseille (France); Evrard, D. [SOGETI High Tech, 180 Rue René Descartes, 13851 Aix en Provence (France); Friconneau, J.P. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Lemée, A. [SOGETI High Tech, 180 Rue René Descartes, 13851 Aix en Provence (France); Levesy, B.; Pitcher, C.S. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2015-10-15

    Highlights: • System engineering approach to consolidate requirements to modify the layout of the Hot Cell. • Illustration of the loop between requirement and design. • Verification process. - Abstract: Internal components of the ITER Tokamak are replaced and transferred to the Hot Cell by remote handling equipment. These components include port plugs, cryopumps, divertor cassettes, blanket modules, etc. They are brought to the refurbishment area of the ITER Hot Cell Building for cleaning and maintenance, using remote handling techniques. The ITER refurbishment area will be unique in the world, when considering combination of size, quantity of complex component to refurbish in presence of radiation, activated dust and tritium. The refurbishment process to integrate covers a number of workstations to perform specific remote operations fully covered by a mast on crane system. This paper describes the integration of the Refurbishment Area, explaining the functions, the methodology followed, some illustrations of trade-off and safety improvements.

  20. Preventing Clogging In A Vacuum Plasma Spray Gun

    Science.gov (United States)

    Krotz, Phillip D.; Daniel, Ronald L., Jr.; Davis, William M.

    1994-01-01

    Modification of powder-injection ports enables lengthy, high-temperature deposition operations. Graphite inserts prevent clogging of ports through which copper powder injected into vacuum plasma spray (VPS) gun. Graphite liners eliminate need to spend production time refurbishing VPS gun, reducing cost of production and increasing productivity. Concept also applied to other material systems used for net-shape fabrication via VPS.

  1. Basic policy of JMTR refurbishment and regulatory procedure

    International Nuclear Information System (INIS)

    Tobita, Kenji

    2012-04-01

    The JMTR refurbishment started from FY2007 had been completed on the end of the FY2010. The refurbishment works carried out on about 60 items nuclear reactor systems, (about 40 of facilities and about 20 constructions) with no trouble. This report review the basic policy of JMTR refurbishment, such as a selection of facilities/equipments for the refurbishment and the determination method of specifications for repairs. The deliberation and discussion by the safety review committee of Oarai Research and Development Center in the Japan Atomic Energy Agency and nuclear regulatory procedure are included in this report. (author)

  2. Refurbishment of the IEAR1 primary coolant system piping supports

    International Nuclear Information System (INIS)

    Fainer, Gerson; Faloppa, Altair A.; Oliveira, Carlos A. de; Mattar Neto, Miguel

    2015-01-01

    A partial replacement of the IEA-R1 piping system was concluded in 2014. This paper presents the study and the structural analysis of the IEA-R1 primary circuit piping supports, considering all the changes involved in the replacement. The IEA-R1 is a nuclear reactor for research purposes designed by Babcox-Willcox that is operated by IPEN since 1957. The reactor life management and modernization program is being conducted for the last two decades and already resulted in a series of changes, especially on the reactor coolant system. This set of components, divided in primary and secondary circuit, is responsible for the circulation of water into the core to remove heat. In the ageing management program that includes regular inspection, some degradation was observed in the primary piping system. As result, the renewing of the piping system was conducted in 2014. Moreover the poor condition of some original piping supports gave rise to the refurbishment of all piping supports. The aim of the present work is to review the design of the primary system piping supports taking into account the current conditions after the changes and refurbishment. (author)

  3. Mechanical Properties Experimental Study of Engineering Vehicle Refurbished Tire

    Science.gov (United States)

    Qiang, Wang; Xiaojie, Qi; Zhao, Yang; Yunlong, Wang; Guotian, Wang; Degang, Lv

    2018-05-01

    The vehicle refurbished tire test system was constructed, got load-deformation, load-stiffness, and load-compression ratio property laws of engineering vehicle refurbished tire under the working condition of static state and ground contact, and built radial direction loading deformation mathematics model of 26.5R25 engineering vehicle refurbished tire. The test results show that radial-direction and side-direction deformation value is a little less than that of the new tire. The radial-direction stiffness and compression ratio of engineering vehicle refurbished tire were greatly influenced by radial-direction load and air inflation pressure. When load was certain, radial-direction stiffness would increase with air inflation pressure increasing. When air inflation pressure was certain, compression ratio of engineering vehicle refurbished tire would enlarge with radial-direction load increasing, which was a little less than that of the new and the same type tire. Aging degree of old car-case would exert a great influence on deformation property of engineering vehicle refurbished tire, thus engineering vehicle refurbished tires are suitable to the working condition of low tire pressure and less load.

  4. Waste drum refurbishment

    International Nuclear Information System (INIS)

    Whitmill, L.J.

    1996-01-01

    Low-carbon steel, radioactive waste containers (55-gallon drums) are experiencing degradation due to moisture and temperature fluctuations. With thousands of these containers currently in use; drum refurbishment becomes a significant issue for the taxpayer and stockholders. This drum refurbishment is a non-intrusive, portable process costing between 1/2 and 1/25 the cost of repackaging, depending on the severity of degradation. At the INEL alone, there are an estimated 9,000 drums earmarked for repackaging. Refurbishing drums rather than repackaging can save up to $45,000,000 at the INEL. Based on current but ever changing WIPP Waste Acceptance Criteria (WAC), this drum refurbishment process will restore drums to a WIPP acceptable condition plus; drums with up to 40% thinning o the wall can be refurbished to meet performance test requirements for DOT 7A Type A packaging. A refurbished drum provides a tough, corrosion resistant, waterproof container with longer storage life and an additional containment barrier. Drums are coated with a high-pressure spray copolymer material approximately .045 inches thick. Increase in internal drum temperature can be held to less than 15 F. Application can be performed hands-on or the equipment is readily adaptable and controllable for remote operations. The material dries to touch in seconds, is fully cured in 48 hours and has a service temperature of -60 to 500 F. Drums can be coated with little or no surface preparation. This research was performed on drums however research results indicate the coating is very versatile and compatible with most any material and geometry. It could be used to provide abrasion resistance, corrosion protection and waterproofing to almost anything

  5. MEA vacuum system

    International Nuclear Information System (INIS)

    Stroo, R.; Schwebke, H.; Heine, E.

    1984-01-01

    This report describes construction and operation of the MEA vacuum system of NIKHEF (Netherlands). First, the klystron vacuum system, beam transport system, diode pump and a triode pump are described. Next, the isolation valve and the fast valves of the vacuum system are considered. Measuring instruments, vacuum system commands and messages of failures are treated in the last chapter. (G.J.P.)

  6. Evaluation methodology for generator refurbishment decisions

    International Nuclear Information System (INIS)

    Moore, W.G.; Ulm, S.F.

    1991-01-01

    The Electrical Power Industry is undergoing tremendous change due to deregulation, aging equipment, environmental concerns, and investment/risk considerations. Public utility commissions, along with shareholders and end consumers, are closely monitoring utilities; decisions, especially in the area of costs-both Operation and Maintenance, and Capital. Increasing emphasis, within the conventional utility environment, has been and continue to be, placed on controlling expenditures. To be responsive to these industry and competitive pressures, utilities must make equipment refurbishment decisions. These decisions should be based on input from many sources, including the severity of the failure, cost of replacement versus refurbishment, risks and safety considerations, the expected remaining life of the unit, operational mode (base or peak), fuel type, initial costs, system capacity, available budgets, and financing options. Many times, however, refurbishment decisions are base don an abstract understanding of the above, but feel, or emotional attachment to a particular option. This paper describes a general methodology for refurbishment decision making, applied specifically to generators. Also included in a case history of one utility's progression through this process

  7. Current status of JMTR refurbishment project

    International Nuclear Information System (INIS)

    Kaminaga, Masanori; Niimi, Motoji; Hori, Naohiko; Takahashi, Kunihiro; Kanno, Masaru; Nakagawa, Tetsuya; Nagao, Yoshiharu; Ishihara, Masahiro; Kawamura, Hiroshi

    2010-02-01

    The JMTR is a light water moderated and cooled, beryllium reflected tank- type reactor using LUE silicide plate-type fuels. Its thermal power is 50 MW, maximum thermal and fast neutron flux is 4x10 18 m -2 s -1 . First criticality was achieved in March 1968, and its operation was stopped from August, 2006 for the refurbishment. The refurbishment is scheduled from the beginning of FY2007 to the end of FY2010. The renewed and upgraded JMTR will be re-started from FY2011. An investigation on aged components (aged-investigation) was carried out for concrete structures of the JMTR reactor building, exhaust stack, etc., and for tanks in the primary cooling system, heat exchangers, pipes in the secondary cooling system, cooling tower, emergency generators and so on, in order to identify their integrity. The aged-investigation was carried out at the beginning of FY2007. As a result, some components were decided to replace from viewpoints of future maintenance and improvement of reliability, and some components or structures were decided to repair. A visual inspection of inner side of the pressure vessel was carried out using an underwater camera in FY2008, and no serious damage was observed. Up to now, refurbishment works are in progress according to the planned schedule. In FY2009, motors of primary cooling pumps, secondary cooling pumps, motors of drain pumps, pump in the primary water transfer line to the water purification system, beryllium reflector frame, low-voltage motor control centers are to be replaced. A nuclear instrumentation system, process control system, safety protection system and so on are to be replaced in FY2010. In this paper, current status of JMTR refurbishment project is presented. (author)

  8. Reactor refurbishment options for a changing climate

    Energy Technology Data Exchange (ETDEWEB)

    McNeish, D. [Bruce Power, Tiverton, Ontario (Canada)

    2012-07-01

    As the industry looks ahead to another generation of reactor refurbishment, it is acknowledged that the traditional way of Retubing a reactor is a daunting prospect for our investors and stakeholders. Innovations are required to mitigate the long downtime and large one-time investment associated with previous reactor refurbishments. These can take the shape of improvements to the Retube processes or by fundamentally changing the approach, e.g., calandria/shield tank replacement or partial Retubes. This session presents technical challenges that utilities need help resolving to arrive at a more attractive reactor refurbishment model. This includes issues related to calandria vessel fitness-for-service, the fuel channel replacement process, the feeder replacement process, life extension of fuel channels and feeders and complexities involving interfacing systems. (author)

  9. Reactor refurbishment options for a changing climate

    International Nuclear Information System (INIS)

    McNeish, D.

    2012-01-01

    As the industry looks ahead to another generation of reactor refurbishment, it is acknowledged that the traditional way of Retubing a reactor is a daunting prospect for our investors and stakeholders. Innovations are required to mitigate the long downtime and large one-time investment associated with previous reactor refurbishments. These can take the shape of improvements to the Retube processes or by fundamentally changing the approach, e.g., calandria/shield tank replacement or partial Retubes. This session presents technical challenges that utilities need help resolving to arrive at a more attractive reactor refurbishment model. This includes issues related to calandria vessel fitness-for-service, the fuel channel replacement process, the feeder replacement process, life extension of fuel channels and feeders and complexities involving interfacing systems. (author)

  10. Refurbishing Fæstningens Materialgård

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2014-01-01

    upgrading and refurbishment of the individual buildings that make up the listed complex. The process focuses on the cooperation and dialogue between the parties involved. Fæstningens Materialgård is a case study where the Heritage Agency, the Danish Working Environment Authority and the owner as a team...... cooperated in identifying feasible refurbishment measures. Through the process the owner was supported by architects and engineers. Focus is put on how, to identify potential energy savings and, to decide on energy upgrading measures when refurbishing and restoring listed buildings. The refurbished...

  11. French experience on renewing I and C systems in NPPs. Feedback from assessing nuclear instrumentation system (RPN) refurbishment at French CP0-series plants

    International Nuclear Information System (INIS)

    Elsensohn, O.; Fradet, F.; Peron, J.C.; Soubies, B.

    2003-01-01

    In 1996, the utility operating France's nuclear power plants launched feasibility studies for the refurbishment of the nuclear instrumentation system (RPN classed category A) installed in its CPO-series (900 MWe) units. The system was ultimately upgraded with digital I and C system, using a SPINLINE 3 platform. This article describes feedback from an evaluation conducted on the refurbishment by the Institute of Radiological Protection and Nuclear Safety (IRSN), technical support arm of the Directorate General for Nuclear Safety and Radiological Protection (DGSNR). The study begins with a historical overview of the refurbishing operation, then discusses the IRSN assessment method and the lessons learned from this first major revamp of an I and C system in the French nuclear reactor series. Based on its previous experience in evaluating I and C systems for P4/P'4 (1300 MWe) and N4 (1450 MWe) plants and to account for the first-ever aspect of such an upgrade, IRSN partitioned its assessment into four phases. This approach enabled taking into account the impact of RPN refurbishment at every level - system, hardware and qualification, software, operation, onsite requalification, health physics, fire protection and human factors. All six units in the CPO series have now been equipped with the new digital RPN. (authors)

  12. Refurbishing the reactor protection systems of VVER-440/230 and VVER-1000/320 nuclear power plants with exclusively digital IandC systems

    International Nuclear Information System (INIS)

    Martin, M.

    1997-01-01

    The refurbishment of reactor protection systems of nuclear power plants is based on two sets of requirements: engineering aspects such as performance, qualification and licensing, as well as interfaces to other systems; and cost-benefit relationships, ease of service and maintenance as well as installation during scheduled outages. A number of WWER-440 and WWER-1000 nuclear plants have announced their intention to refurbish their protection systems. Since 1994, these plants have been placing orders with Siemens for new protection systems, including the neutron flux monitoring system utilizing the advanced system TELEPERM XS. This exclusively digital IandC system provides an excellent foundation for the remaining plant service life

  13. Vacuum system for ISABELLE

    International Nuclear Information System (INIS)

    Hobson, J.P.

    1975-01-01

    An analysis is presented of the proposed vacuum system for the planned ISABELLE storage rings with respect to acceptability and practicality from the vacuum viewport. A comparison is made between the proposed vacuum system and the vacuum system at the CERN ISR, and some comments on various design and operational parameters are made

  14. Model for Refurbishment of Heritage Buildings

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2014-01-01

    the Heritage Agency, the Danish Working Environment Authority and the owner as a team cooperated in identifying feasible refurbishments. In this case, the focus centered on restoring and identifying potential energy savings and deciding on energy upgrading measures for the listed complex. The refurbished...... with the requirements for the use of the building. The model focuses on the cooperation and dialogue between authorities and owners, who refurbish heritage buildings. The developed model was used for the refurbishment of the listed complex, Fæstningens Materialgård. Fæstningens Materialgård is a case study where...

  15. Cold Vacuum Drying (CVD) Facility Vacuum Purge System Chilled Water System Design Description. System 47-4

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    2000-01-01

    This system design description (SDD) addresses the Vacuum Purge System Chilled Water (VPSCHW) system. The discussion that follows is limited to the VPSCHW system and its interfaces with associated systems. The reader's attention is directed to Drawings H-1-82162, Cold Vacuum Drying Facility Process Equipment Skid PandID Vacuum System, and H-1-82224, Cold Vacuum Drying Facility Mechanical Utilities Process Chilled Water PandID. Figure 1-1 shows the location and equipment arrangement for the VPSCHW system. The VPSCHW system provides chilled water to the Vacuum Purge System (VPS). The chilled water provides the ability to condense water from the multi-canister overpack (MCO) outlet gases during the MCO vacuum and purge cycles. By condensing water from the MCO purge gas, the VPS can assist in drying the contents of the MCO

  16. Refurbishment and upgrading of Iron Gates I Hydroelectric and Navigation System on the Danube River

    International Nuclear Information System (INIS)

    Scvortov, F.; Vasiliu, A.; Rosca, N.

    1996-01-01

    This work shows the problems of the refurbishing the hydroelectric units of the Iron Gates 1 Hydroelectric and Navigation System, operating since 1970. Their long and intensive utilization leads to the necessity of their refurbishment. One is demonstrated by detailed studies that it is sensible and efficient to perform both rehabilitation of the existent hydroelectric units and their power increasing from 175 MW to 190 MW, and prior to all these, as a first step, to install an additional hydroelectric unit (G7) for each system with a capacity of 190 MW. Complex technical and energetic-economical problems appear in realizing this objective due to the necessity of analysing a great volume of data in view of taking a correct decision. (author). 7 figs

  17. Motier church - refurbishment of heating system; Kirche Motier Sanierung der Raumheizung

    Energy Technology Data Exchange (ETDEWEB)

    Grizzetti, V.

    2003-07-01

    This final report for the Swiss Federal Office for Energy describes the refurbishment of the space heating system of the historical church in Motier, Switzerland. The 50-year old, inefficient electrical direct heating system of the church, which is a listed building, and the new, heat pump-based system are described. Heating energy is distributed via a warm-air system, geothermal energy provides the primary heat source for the heat pump. Technical details of the heating characteristics and energy consumption of the old and new heating systems are presented in the form of tables and diagrams. The maintenance of the heating system's ventilation unit is also discussed.

  18. Refurbishment decision support tools review—Energy and life cycle as key aspects to sustainable refurbishment projects

    International Nuclear Information System (INIS)

    Ferreira, Joaquim; Pinheiro, Manuel Duarte; Brito, Jorge de

    2013-01-01

    Europe is facing one of its most challenging crises since Great Depression and the construction sector is one of the worst affected. Refurbishment is therefore often suggested as one of the most useful solutions for the current real estate crisis in consolidated areas like the EU. On the other hand, it is imperative to construct buildings according to sustainable principles regarding economic, environmental and social issues. Therefore, proper decision-support methods are needed to help designers, investors and policy makers to choose the most sustainable solution for a refurbishment project, especially for energy retrofit works. This paper reviews the works relating to sustainable refurbishment decision-support tools which have already been developed. For this purpose we have analysed and classified 40 different methods, with particular focus on their main common aims. They are also compared with other classifications proposed. This paper further highlights the role of energy as a driving factor and discusses what other research developments are needed to create related tools for the future that could respond to actual construction requirements. - Highlights: • Sustainable refurbishment as an important challenge. • Proper decision-support methods are needed to refurbishment. • The paper reviews 40 different methods, focusing their main common aims. • The paper highlights the role of the energy as key factor to search sustainability. • It also stresses the importance of life cycle approach in refurbishment projects

  19. Engineering study radioactive liquid waste treatment plant refurbishment

    International Nuclear Information System (INIS)

    Suazo, I.L.

    1994-01-01

    This feasibility study will investigate the opportunities, restrictions and cost impact to refurbish the existing Radioactive Liquid Waste Treatment Plant (RLWTP) while utilizing the same basic criteria that was used in the development of the new Radioactive Liquid Waste Treatment Facility (RLWTF). The objective of this study is to perform a more in-depth analysis of refurbishing the existing than has been done in the past so as to provide a basis for comparison between refurbishing the existing or constructing a new. The existing plant is located at Technical Area 50 (TA-50) within the Los Alamos National Laboratory (LANL). The initial structure was built in 1963. Over the ensuing years, the building has been modified and several additions have been constructed. In 1966, laboratories, ion exchange and pretreatment functions were added. The decontamination and decommissioning activities and ventilation equipment were added in 1984. The following assumptions are the basic parameters considered in the development of a design concept to refurbish the RLWTP: (1) Allow continued operation of the during retrofit construction. (2) Design the necessary expansion within the site constraints. (3) Satisfy National Pollutant Discharge Elimination System (NPDES) and National Emission Standards for Hazardous Air Pollutants (NESHAPS) permit conditions and other environmental regulations. (4) Comply with present DOE Orders and building code requirements. The refurbishment concept is a phased demolition and construction process

  20. Refurbishment and safety upgradation of research reactor Cirus

    International Nuclear Information System (INIS)

    Marik, S.K.; Rao, D.V.H.; Bhatnagar, A.; Pant, R.C.; Tikku, A.C.; Sankar, S.

    2006-01-01

    Cirus, a 40 MW t, vertical tank type research reactor, having wide range of research facilities, was commissioned in the year 1960. This research reactor, situated at Mumbai, India has been operated and utilized extensively for isotope production, material testing and neutron beam research for nearly four decades. With a view to assess the residual life of the reactor, detailed ageing studies were carried out during the early 1990s. Based on these studies, refurbishment of Cirus for its life extension was taken up. During refurbishment, additional safety features were incorporated in various systems to qualify them for the current safety standards. This paper gives the details of the operating experiences, utilization of the reactor along with methodologies followed for carrying out detailed ageing studies, refurbishment and safety upgradation for its life extension

  1. The status of the LANSCE refurbishment project (LANSCE-R)

    International Nuclear Information System (INIS)

    Erickson, John Leonard; Jones, Kevin; Streve, Michael

    2008-01-01

    The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The conceptual design phase for the project is funded and underway. The 5 year, $170M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The functional and operating requirements will be discussed, the proposed technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

  2. Refurbishment of an Analytical Laboratory Hot Cell Facility

    International Nuclear Information System (INIS)

    Rosenberg, K.; Henslee, S.P.; Michelbacher, J.A.; Coleman, R.M.

    1997-01-01

    An Analytical Laboratory Hot Cell (ALHC) Facility at Argonne National Laboratory-West (ANL-W) was in service for nearly thirty years. In order to comply with DOE regulations governing such facilities and meet ANL-W programmatic requirements, a major refurbishment effort was undertaken. All penetrations within the facility were sealed; the ventilation system was redesigned, upgraded and replaced; the manipulators were replaced; the hot cell windows were removed, refurbished, and reinstalled; all hot cell utilities were replaced; a lead-shielded glovebox housing an Inductively Coupled Plasma - Atomic Emission Spectrometer (ICP-AES) System was interfaced with the hot cells, and a new CO2 fire suppression system and other ALHC support equipment were installed

  3. Corrosion inhibition measures in primary cooling water system during refurbishment of Cirus, re-commissioning and subsequent operation

    International Nuclear Information System (INIS)

    Rai, K.K.; Ramesh, N.; Sharma, R.C.

    2008-01-01

    Cirus is a 40 MWth, heavy water moderated, demineralized light water cooled, natural uranium fuelled research reactor. Reactor was commissioned in year 1960 and operated satisfactorily till 1990. After that availability factor started decreasing mainly due to equipment outage exhibiting signs of ageing. Based upon systematic ageing studies and assessment of condition of systems, structures and components, a refurbishment plan including safety upgrades was drawn up. Reactor was shut down in October 1997 for execution of jobs. After completion of refurbishment jobs reactor was started back in October 2002 and power operation was achieved in 2003. Primary cooling water (PCW) system consists of re-circulating pumps, heat exchangers, expansion tank, piping, valves, emergency storage reservoir (Ball Tank) and other components. Normally the fission heat from fuel is removed by re-circulating coolant in closed loop and transferred to seawater via heat exchangers. In case of outage of pumps, shut down cooling is provided by flow of water from Ball Tank under gravity to the underground dump tanks. The dissolved oxygen is maintained below 2 ppm and pH is maintained neutral to minimize corrosion of fuel cladding (Aluminum). This paper highlights the experience gained during segmentation of primary cooling water pipelines for pressure testing, measures taken to corrosion inhibition of primary cooling water lines to permit execution of refurbishment jobs, inspections and actions taken to repair/replace the corroded PCW pipe line segments, observations regarding corrosion related failures, re-commissioning of the system after refurbishment, assessment for safe reactor operation and experience during power operation. (author)

  4. Refurbishment of hydropower generation plants

    International Nuclear Information System (INIS)

    Kofler, W.

    2001-01-01

    This article presents the factors taken into consideration and the methods used for the management of refurbishment work in the hydropower installations of the TUWAG - a Tyrolean hydropower company in Austria. The technical and financial advantages to be gained from refurbishment are discussed and the requirements placed on the structuring of refurbishment projects are described. Various factors such as plant operation and maintenance, increased returns through better efficiency and cost reduction through lower wear and tear and reduced risk of failure are discussed. Annexes to the article cover monitoring and measurement techniques, the simulation of mechanical and hydraulic conditions, profitability calculations and turbine management

  5. Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

    International Nuclear Information System (INIS)

    Pieck, Martin; Erickson, John E.; Gulley, Mark S.; Jones, Kevin W.; Rybarcyk, Larry J.

    2009-01-01

    The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.

  6. Refurbishment and safety management of JMTR in extended showdown

    International Nuclear Information System (INIS)

    Ide, Hiroshi; Hori, Naohiko; Gorai, Shigeru; Kusunoki, Tsuyoshi

    2011-06-01

    Japan Materials Testing Reactor (JMTR) is a testing reactor dedicated to the irradiation tests of materials and fuels. The reactor type of the JMTR is light water moderated and cooled tank type. It achieved first criticality in 1968. Operation was started in 1970. The JMTR had been being operated for 38 years from first criticality to the JMTR No.165 cycle finished. Periodic Safety Review (PSR) was carried out with confirming the integrity inspection of the JMTR reactor facilities. And the 10 years maintenance plan was made in 2004. After that, the restart of the JMTR has been strongly requested from various users as the only irradiation testing reactor in Japan. Finally, Japan Atomic Energy Agency (JAEA) decided the refurbishment and restart of the JMTR in December 2006, and the refurbishment works was started from FY 2007. The equipment to remain in use and that which needs replacing before the restart of the JMTR was selected after having been evaluated on its damage and wear due to aging significance in safety functions, past safety-related maintenance date, and the enhancement of facility operation. The renewal work of power supply system, boiler, radioactive waste facility, etc. was already carried out as scheduled. The renewal work of reactor control system, nuclear instrumentation system and so on is being carried out. As for the safety management during reactor operation, the facility periodical own inspection and daily inspection is carried out for the purpose of maintaining soundness and reliability of facilities and equipments. And it is confirmed that the performance of facilities and equipments is maintained. As for the radiation control, irradiation dose limit determined by the law is obeyed. Based on the Concept of radiation protection of the International Commission on Radiation Protection (ICRP), reduction of dose is endeavored. The safety management during reactor shutdown is also carried out as well as it of reactor operation term. However, the

  7. Status of the BR2 refurbishment programme

    International Nuclear Information System (INIS)

    Koonen, E.

    1995-01-01

    The operation of the BR2 reactor with its second beryllium matrix is foreseen up to mid-1995. A refurbishment programme has been established in order to allow for future operation during at least ten years. Recently a positive decision to effectively carry out this programme has been taken. The refurbishment action plan follows from a general assessment of the different systems of BR2, with respect to their actual status, the operational experience and the evolution of safety standards and criteria. Ageing considerations were of uppermost importance in those assessments, not only to assure safety of future operation, but also to guarantee future availability and reliability. (orig.)

  8. The BR2 refurbishment programme: achievements and two years operation feedback

    International Nuclear Information System (INIS)

    Gubel, P.; Dekeyser, J.; Koonen, E.; Van der Auwera, J.

    1999-01-01

    The BR2 reactor was shutdown end of June 1995 for an extensive refurbishment after more than 30 years utilization. The beryllium matrix needed to be replaced and the aluminium vessel inspected for an envisaged 15 year life extension. Other aspects of the refurbishment programme aimed at the reliability and availability of the installations, safety of operation and compliance with modern safety standards. The reactor was started again in' April '97 and operated only for three cycles in 1997. These first irradiation cycles were intended as a demonstration of the safety and reliability of all components and systems after refurbishment. Also during the extended shutdowns non-critical refurbishment tasks were allowed to be continued and finalized. At the request of the Safety Authorities, some modifications and studies are still in progress without perturbation of the reactor operation. (author)

  9. Point Lepreau refurbishment: plant condition assessment

    International Nuclear Information System (INIS)

    Allen, P.J.; Soulard, M.R.; David, F.; Clefton, G.; Weeks, R.

    2001-01-01

    New Brunswick Power (NB Power) has initiated a study into the refurbishment of the Point Lepreau Generating Station, with the objective to extend plant operation another 25 to 30 years. The end product of this study will be a business case that compares the costs of refurbishing Point Lepreau with costs of alternate means of generation. The Project Execution Plan and business case are being developed by an integrated team of AECL, NB Power and subcontractor staff under the project management of AECL. The refurbishment scope will include replacement of the pressure tubes, calandria tubes and part of the feeder piping. Planning of these replacements is part of the refurbishment study work. Planning is also underway for the environmental, safety and licensing issues that would need to be addressed to ensure future operation of the unit. In addition to these studies, a systematic review of the plant has been carried out to determine what other equipment refurbishment or replacement will be required due to ageing or obsolescence of plant equipment. This Plant Condition Assessment (PCA) follows a highly structured approach to ensure consistency. This paper presents an overview of the engineering process and the main findings from the work. (author)

  10. Sustainability Potentials of Housing Refurbishment

    Directory of Open Access Journals (Sweden)

    Behzad Sodagar

    2013-03-01

    Full Text Available The benefits of choosing refurbishment over new build have recently been brought into focus for reducing environmental impacts of buildings. This is due to the fact that the existing buildings will comprise the majority of the total building stocks for years to come and hence will remain responsible for the majority of greenhouse gas emissions from the sector. This paper investigates the total potentials of sustainable refurbishment and conversion of the existing buildings by adopting a holistic approach to sustainability. Life Cycle Assessment (LCA and questionnaires have been used to analyse the environmental impact savings (Co2e, improved health and well-being, and satisfaction of people living in refurbished homes. The results reported in the paper are based on a two year externally funded research project completed in January 2013.

  11. Shiva and Argus target diagnostics vacuum systems

    International Nuclear Information System (INIS)

    Glaros, S.S.; Mayo, S.E.; Campbell, D.; Holeman, D.

    1978-09-01

    The normal operation of LLL's Argus and Shiva laser irradiation facilities demand a main vacuum system for the target chamber and a separate local vacuum system for each of the larger appendage dianostics. This paper will describe the Argus and Shiva main vacuum systems, their respective auxiliary vacuum systems and the individual diagnostics with their respective special vacuum requirements and subsequent vacuum systems. Our latest approach to automatic computer-controlled vacuum systems will be presented

  12. Reactor refurbishment in an outage environment

    International Nuclear Information System (INIS)

    Gowthorpe, P.; Hoare, R.

    2012-01-01

    Reactor life extension has typically been performed during specific refurbishment outages. These outages are long and costly due to the sheer complexity of the scope, not to mention the ever present discovery work. A scope of this size requires a huge labour force to execute, which poses significant challenges. The work is difficult to staff with qualified people able to execute the work smoothly and managing the required labour pool problematic. Cost and time overruns are inevitable in that environment. Reducing the cost and schedule is critical to the long term viability of reactor refurbishment projects. With planning, the total cost of the refurbishment can be reduced by managing the inspection and repairs during normal outages. Identifying what activities need to be done each outage for the life of the reactor and bringing the latest technology can make this viable. Tightly planned outages with a small well trained labour force will go a long way to reducing costs. The suite of services and tooling available to the utilities to manage their reactor integrity has improved significantly in recent years and continues to evolve. New feeder inspection technologies can provide improved inspection results for the complex feeder geometry. These improvements lead to more accurate wear rates and better predictions of component life. Feeders that need replacement based on improved inspection techniques can be replaced systematically during regular outages rather than specific refurbishment outages. Targeting areas rather than entire feeders reduces time, dose and cost. In cases where feeder replacement isn't feasible or where unpredicted wear is found, a feeder weld overlay process can be used. To manage the reactor work, new data systems are under development that allow for effective tracking of each activity performed and outcomes in a single package. (author)

  13. Possible refurbishment of Point Lepreau

    International Nuclear Information System (INIS)

    White, R.M.; Groom, S.H.; Thompson, P.D.; Barclay, J.M.; Allen, P.J.

    2001-01-01

    In February 2000, the NB Power Board of Directors approved Phase one of a project to produce a business case including a detailed scope and estimate associated with the possible refurbishment of the Point Lepreau Generating Station (PLGS). The Preliminary plan for refurbishment projects an 18-month outage starting as early as the spring of 2006. If the station were to be refurbished, then it would be run for another 25 to 30 years. The decision on whether or not to refurbish PLGS has not been made and is not expected until the summer of 2002. The results of the first phase of the project will be used to prepare a detailed business case that will be presented to the NB Power board of directors in January of 2002. At that time a decision will be made as to whether to refurbish the unit, or obtain other means of replacing the energy produced by PLGS. The station currently produces about a third of the power generated within the province. If the business case is approved, all-380 Pressure Tubes and Calandria Tubes, along with their related End Fittings and Feeders would be replaced. This material would be stored in new storage vaults to be constructed at the existing on-site Waste Management Facility. Replacement of other station components will be performed as required, as determined from the results of a comprehensive Plant Condition Assessment. The condition assessments build on work done under the Plant Life Management Program. Point Lepreau Generating Station has operated well since start of commercial operation in early 1983. With a lifetime capacity factor of about 84% (up to the end of 2000), it has proven to be an economic and environmentally sound electricity provider. The station has also had a significant positive economic impact in Southern New Brunswick, employing over 600 people. However the Pressure Tubes and Feeders are nearing the point in time in which they will exceed their fitness for service criteria. Although tubes can be replaced on an

  14. Possible refurbishment of Point Lepreau

    International Nuclear Information System (INIS)

    White, R.M.; Groom, S.H.; Thompson, P.D.; Barclay, J.M.; Allen, P.J.

    2001-01-01

    In February 2000, the NB Power Board of Directors approved Phase one of a project to produce a business case including a detailed scope and estimate associated with the possible refurbishment of the Point Lepreau Generating Station (PLGS). The Preliminary plan for refurbishment projects an 18-month outage starting as early as the spring of 2006. If the station were to be refurbished, then it would be run for another 25 to 30 years. The decision on whether or not to refurbish PLGS has not been made and is not expected until the summer of 2002. The results of the first phase of the project will be used to prepare a detailed business case that will be presented to the NB Power board of directors in January of 2002. At that time a decision will be made as to whether to refurbish the unit, or obtain other means of replacing the energy produced by PLGS. The station currently produces about a third of the power generated within the province. If the business case is approved, all-380 Pressure Tubes and Calandria Tubes, along with their related End Fittings and Feeders would be replaced. This material would be stored in new storage vaults to be constructed at the existing on-site Waste Management Facility. Replacement of other station components will be performed as required, as determined from the results of a comprehensive Plant Condition Assessment. The condition assessments build on work done under the Plant Life Management Program. Point Lepreau Generating Station has operated well since start of commercial operation in early 1983. With a lifetime capacity factor of about 84% (up to the end of 2000), it has proven to be an economic and environmentally sound electricity provider. The station has also had a significant positive economic impact in Southern New Brunswick, employing over 600 people. However the Pressure Tubes and Feeders are nearing the point in time in which they will exceed their fitness for service criteria. Although tubes can be replaced on an

  15. Radiation protection aspects of AECL's retube/refurbishment projects

    International Nuclear Information System (INIS)

    Zhuang, Y.; Boss, C.R.; Pontikakis, N.

    2007-01-01

    In contrast to the construction of a new nuclear reactor, Retube/Refurbishment of nuclear reactors that have been in operation for many years will involve fabrication of a new core in a radiation environment. Careful planning of the radiation protection (RP) program is crucial to ensure the protection of workers and the environment, and the success of the projects. This paper describes the key RP activities currently underway in AECL's Retube/Refurbishment projects, covering RP during retubing tooling and system designs, retubing work planning, retubing operation, and waste transfer and management. The discussion will focus on RP initiatives from engineering design aspects of the projects. (author)

  16. Technical specification for vacuum systems

    International Nuclear Information System (INIS)

    Khaw, J.

    1987-01-01

    The vacuum systems at the Stanford Linear Accelerator Center (SLAC) are primarily of all-metal construction and operate at pressures from 10 -5 to 10 -11 Torr. The primary gas loads during operation result from thermal desorption and beam-induced desorption from the vacuum chamber walls. These desorption rates can be extremely high in the case of hydrocarbons and other contaminants. These specifications place a major emphasis on eliminating contamination sources. The specifications and procedures have been written to insure the cleanliness and vacuum integrity of all SLAC vacuum systems, and to assist personnel involved with SLAC vacuum systems in choosing and designing components that are compatible with existing systems and meet the quality and reliability of SLAC vacuum standards. The specification includes requirements on design, procurement, fabrication, chemical cleaning, clean room practices, welding and brazing, helium leak testing, residual gas analyzer testing, bakeout, venting, and pumpdown. Also appended are specifications regarding acceptable vendors, isopropyl alcohol, bakeable valve cleaning procedure, mechanical engineering safety inspection, notes on synchrotron radiation, and specifications of numerous individual components

  17. Multivariant design and multiple criteria analysis of building refurbishments

    Energy Technology Data Exchange (ETDEWEB)

    Kaklauskas, A.; Zavadskas, E. K.; Raslanas, S. [Faculty of Civil Engineering, Vilnius Gediminas Technical University, Vilnius (Lithuania)

    2005-07-01

    In order to design and realize an efficient building refurbishment, it is necessary to carry out an exhaustive investigation of all solutions that form it. The efficiency level of the considered building's refurbishment depends on a great many of factors, including: cost of refurbishment, annual fuel economy after refurbishment, tentative pay-back time, harmfulness to health of the materials used, aesthetics, maintenance properties, functionality, comfort, sound insulation and longevity, etc. Solutions of an alternative character allow for a more rational and realistic assessment of economic, ecological, legislative, climatic, social and political conditions, traditions and for better the satisfaction of customer requirements. They also enable one to cut down on refurbishment costs. In carrying out the multivariant design and multiple criteria analysis of a building refurbishment much data was processed and evaluated. Feasible alternatives could be as many as 100,000. How to perform a multivariant design and multiple criteria analysis of alternate alternatives based on the enormous amount of information became the problem. Method of multivariant design and multiple criteria of a building refurbishment's analysis were developed by the authors to solve the above problems. In order to demonstrate the developed method, a practical example is presented in this paper. (author)

  18. Nitrogen Gas Heating and Supply System for SST-1 Tokamak

    International Nuclear Information System (INIS)

    Khan, Ziauddin; Pathan, Firozkhan; Paravastu, Yuvakiran; George, Siju; Ramesh, Gattu; Bindu, Hima; Raval, Dilip C.; Thankey, Prashant; Dhanani, Kalpesh; Pradhan, Subrata

    2013-01-01

    Steady State Tokamak (SST-1) vacuum vessel baking as well as baking of the first wall components of SST-1 are essential to plasma physics experiments. Under a refurbishment spectrum of SST-1, the nitrogen gas heating and supply system has been fully refurbished. The SST-1 vacuum vessel consists of ultra-high vacuum (UHV) compatible eight modules and eight sectors. Rectangular baking channels are embedded on each of them. Similarly, the SST-1 plasma facing components (PFC) are comprised of modular graphite diverters and movable graphite based limiters. The nitrogen gas heating and supply system would bake the plasma facing components at 350°C and the SST-1 vacuum vessel at 150°C over an extended duration so as to remove water vapour and other absorbed gases. An efficient PLC based baking facility has been developed and implemented for monitoring and control purposes. This paper presents functional and operational aspects of a SST-1 nitrogen gas heating and supply system. Some of the experimental results obtained during the baking of SST-1 vacuum modules and sectors are also presented here. (fusion engineering)

  19. Refurbishment of the gas system, Task 3.08/04-07; Podzadatak 3.08/04-07 Remont sistema gasa

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Bratic, A [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the period planned for maintenance and refurbishment of the RA reactor gas system in the RA reactor building was inspected and tested, the components were cleaned and decontaminated. This report describes detailed instructions and actions concerning repair and decontamination of the gas system components.

  20. Simulated thermal energy demand and actual energy consumption in refurbished and non-refurbished buildings

    Science.gov (United States)

    Ilie, C. A.; Visa, I.; Duta, A.

    2016-08-01

    The EU legal frame imposes the Nearly Zero Energy Buildings (nZEB) status to any new public building starting with January 1st, 2019 and for any other new building starting with 2021. Basically, nZEB represents a Low Energy Building (LEB) that covers more than half of the energy demand by using renewable energy systems installed on or close to it. Thus, two steps have to be followed in developing nZEB: (1) reaching the LEB status through state- of-the art architectural and construction solutions (for the new buildings) or through refurbishing for the already existent buildings, followed by (2) implementing renewables; in Romania, over 65% of the energy demand in a building is directly linked to heating, domestic hot water (DHW), and - in certain areas - for cooling. Thus, effort should be directed to reduce the thermal energy demand to be further covered by using clean and affordable systems: solar- thermal systems, heat pumps, biomass, etc. or their hybrid combinations. Obviously this demand is influenced by the onsite climatic profile and by the building performance. An almost worst case scenario is approached in the paper, considering a community implemented in a mountain area, with cold and long winters and mild summers (Odorheiul Secuiesc city, Harghita county, Romania). Three representative types of buildings are analysed: multi-family households (in blocks of flats), single-family houses and administrative buildings. For the first two types, old and refurbished buildings were comparatively discussed.

  1. Last PS magnet refurbished

    CERN Multimedia

    2009-01-01

    PS Magnet Refurbishment Programme Completed. The 51st and final refurbished magnet was transported to the PS on Tuesday 3 February. The repair and consolidation work on the PS started back in 2003 when two magnets and a busbar connection were found to be faulty during routine high-voltage tests. The cause of the fault was a combination of age and radiation on electrical insulation. After further investigation the decision was taken to overhaul half of the PS’s 100 magnets to reduce the risk of a similar fault. As from 20 February the PS ring will start a five-week test programme to be ready for operation at the end of March.

  2. Refurbishment of BR2 (Phases 4 and 5)

    Energy Technology Data Exchange (ETDEWEB)

    Gubel, P.; Dekeyser, J.; Van Der Auwera, J

    1998-07-01

    The BR2 is a materials testing reactor and is SCK-CEN's most important nuclear facility. After an extensive refurbishment to compensate for the ageing of the installation, the reactor was restarted in April 1997. In phase 4 of the refurbishment programme, various activities were performed to allow reactor start-up. In phase 5, remaining refurbishment works were carried out as well as the extra studies and upgradings required by the licensing authorities. Major achievements in 1997 are described and discussed.

  3. Refurbishment of BR2 (Phases 4 and 5)

    International Nuclear Information System (INIS)

    Gubel, P.; Dekeyser, J.; Van Der Auwera, J.

    1998-01-01

    The BR2 is a materials testing reactor and is SCK-CEN's most important nuclear facility. After an extensive refurbishment to compensate for the ageing of the installation, the reactor was restarted in April 1997. In phase 4 of the refurbishment programme, various activities were performed to allow reactor start-up. In phase 5, remaining refurbishment works were carried out as well as the extra studies and upgradings required by the licensing authorities. Major achievements in 1997 are described and discussed

  4. Refurbishment of BR2 (Phases 4 and 5)

    Energy Technology Data Exchange (ETDEWEB)

    Gubel, P; Dekeyser, J; Van Der Auwera, J

    1998-07-01

    The BR2 is a materials testing reactor and is SCK-CEN's most important nuclear facility. After an extensive refurbishment to compensate for the ageing of the installation, the reactor was restarted in April 1997. In phase 4 of the refurbishment programme, various activities were performed to allow reactor start-up. In phase 5, remaining refurbishment works were carried out as well as the extra studies and upgradings required by the licensing authorities. Major achievements in 1997 are described and discussed.

  5. Home-made refurbishment of the instrumentation and control system of the TRIGA reactor of the University of Pavia

    International Nuclear Information System (INIS)

    Borio di Tigliole, A.; Cagnazzo, M.; Magrotti, G.; Manera, S.; Salvini, A.; Musitelli, G.; Nardo, R.

    2008-01-01

    The Instrumentation and Control (I and C) System of the TRIGA reactor of the University of Pavia was dated and, in order to grant a safe and continuous reactor operation for the future, it became necessary to substitute or to upgrade the system. Since the substitution of the I and C system with a new-made one was very difficult to be performed due to long authorization procedures, an home-made refurbishment was planned. Using commercial components of high quality, almost a complete substitution, channel-by-channel, of the I and C system was realized without changing the operating and safety logics. The system includes: - the Reactor Linear Power Channel and Chart Recorder; - the Reactor Percent Power Safety Channel; - the High Voltage and Low Voltage Power Supply; - the Automatic Reactor Power Control; - the Fuel Elements and Cooling-Water Temperatures Measuring Channels; - the Water Conductivity Measuring Channel. The refurbished I and C system shows a very good operational behavior and reliability and will assure a continuous operation of the reactor for the future

  6. Sustainable refurbishment of exterior walls and building facades. Final report, Part B - General refurbishment concepts

    Energy Technology Data Exchange (ETDEWEB)

    Vares, S.; Pulakka, S.; Toratti, T. [and others

    2012-11-01

    This report is the second part of the final report of Sustainable refurbishment of building facades and exterior walls (SUSREF). SUSREF project was a collaborative (small/medium size) research project within the 7th Framework Programme of the Commission and it was financed under the theme Environment (including climate change) (Grant agreement no. 226858). The project started in October 1st 2009 and ended in April 30th 2012. The project included 11 partners from five countries. SUSREF developed sustainable concepts and technologies for the refurbishment of building facades and external walls. This report together with SUSREF Final report Part B and SUSREF Final Report Part C introduce the main results of the project. Part A focuses on methodological issues. The descriptions of the concepts and the assessment results of the developed concepts are presented in SUSREF Final report part B (generic concepts) and SUSREF Final report Part C (SME concepts). The following list shows the sustainability assessment criteria defined by the SUSREF project. These are Durability; Impact on energy demand for heating; Impact on energy demand for cooling; Impact on renewable energy use potential; Impact on daylight; Environmental impact of manufacture and maintenance; Indoor air quality and acoustics; Structural stability; Fire safety; Aesthetic quality; Effect on cultural heritage; Life cycle costs; Need for care and maintenance; Disturbance to the tenants and to the site; Buildability. This report presents sustainability assessment results of general refurbishment concepts and gives recommendations on the basis of the results. The report covers the following refurbishment cases - External insulation - Internal insulation - Cavity wall insulation - Replacement Insulation during renovation.

  7. Refurbishment of JMTR pure water facility

    International Nuclear Information System (INIS)

    Asano, Norikazu; Hanakawa, Hiroki; Kusunoki, Hidehiko; Satou, Shinichi

    2012-05-01

    In the refurbishment of JMTR, facilities were classified into which (1) were all updated, (2) were partly updated, and (3) were continuance used by the considerations of the maintenance history, the change parts availability and the latest technology. The JMTR pure water facility was classified into all updated facility based on the consideration. The Update construction was conducted in between FY2007 and FY2008. The refurbishment of JMTR pure water facility is summarized in this report. (author)

  8. ITER diagnostic system: Vacuum interface

    Energy Technology Data Exchange (ETDEWEB)

    Patel, K.M., E-mail: Kaushal.Patel@iter.org [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-Lez-Durance (France); Udintsev, V.S.; Hughes, S.; Walker, C.I.; Andrew, P.; Barnsley, R.; Bertalot, L. [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-Lez-Durance (France); Drevon, J.M. [Bertin Technologies, BP 22, 13762 Aix-en Provence cedex 3 (France); Encheva, A. [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-Lez-Durance (France); Kashchuk, Y. [Institution “PROJECT CENTER ITER”, 1, Akademika Kurchatova pl., Moscow (Russian Federation); Maquet, Ph. [Bertin Technologies, BP 22, 13762 Aix-en Provence cedex 3 (France); Pearce, R.; Taylor, N.; Vayakis, G.; Walsh, M.J. [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-Lez-Durance (France)

    2013-10-15

    Diagnostics play an essential role for the successful operation of the ITER tokamak. They provide the means to observe control and to measure plasma during the operation of ITER tokamak. The components of the diagnostic system in the ITER tokamak will be installed in the vacuum vessel, in the cryostat, in the upper, equatorial and divertor ports, in the divertor cassettes and racks, as well as in various buildings. Diagnostic components that are placed in a high radiation environment are expected to operate for the life of ITER. There are approx. 45 diagnostic systems located on ITER. Some diagnostics incorporate direct or independently pumped extensions to maintain their necessary vacuum conditions. They require a base pressure less than 10{sup −7} Pa, irrespective of plasma operation, and a leak rate of less than 10{sup −10} Pa m{sup 3} s{sup −1}. In all the cases it is essential to maintain the ITER closed fuel cycle. These directly coupled diagnostic systems are an integral part of the ITER vacuum containment and are therefore subject to the same design requirements for tritium and active gas confinement, for all normal and accidental conditions. All the diagnostics, whether or not pumped, incorporate penetration of the vacuum boundary (i.e. window assembly, vacuum feedthrough etc.) and demountable joints. Monitored guard volumes are provided for all elements of the vacuum boundary that are judged to be vulnerable by virtue of their construction, material, load specification etc. Standard arrangements are made for their construction and for the monitoring, evacuating and leak testing of these volumes. Diagnostic systems are incorporated at more than 20 ports on ITER. This paper will describe typical and particular arrangements of pumped diagnostic and monitored guard volume. The status of the diagnostic vacuum systems, which are at the start of their detailed design, will be outlined and the specific features of the vacuum systems in ports and extensions

  9. ITER diagnostic system: Vacuum interface

    International Nuclear Information System (INIS)

    Patel, K.M.; Udintsev, V.S.; Hughes, S.; Walker, C.I.; Andrew, P.; Barnsley, R.; Bertalot, L.; Drevon, J.M.; Encheva, A.; Kashchuk, Y.; Maquet, Ph.; Pearce, R.; Taylor, N.; Vayakis, G.; Walsh, M.J.

    2013-01-01

    Diagnostics play an essential role for the successful operation of the ITER tokamak. They provide the means to observe control and to measure plasma during the operation of ITER tokamak. The components of the diagnostic system in the ITER tokamak will be installed in the vacuum vessel, in the cryostat, in the upper, equatorial and divertor ports, in the divertor cassettes and racks, as well as in various buildings. Diagnostic components that are placed in a high radiation environment are expected to operate for the life of ITER. There are approx. 45 diagnostic systems located on ITER. Some diagnostics incorporate direct or independently pumped extensions to maintain their necessary vacuum conditions. They require a base pressure less than 10 −7 Pa, irrespective of plasma operation, and a leak rate of less than 10 −10 Pa m 3 s −1 . In all the cases it is essential to maintain the ITER closed fuel cycle. These directly coupled diagnostic systems are an integral part of the ITER vacuum containment and are therefore subject to the same design requirements for tritium and active gas confinement, for all normal and accidental conditions. All the diagnostics, whether or not pumped, incorporate penetration of the vacuum boundary (i.e. window assembly, vacuum feedthrough etc.) and demountable joints. Monitored guard volumes are provided for all elements of the vacuum boundary that are judged to be vulnerable by virtue of their construction, material, load specification etc. Standard arrangements are made for their construction and for the monitoring, evacuating and leak testing of these volumes. Diagnostic systems are incorporated at more than 20 ports on ITER. This paper will describe typical and particular arrangements of pumped diagnostic and monitored guard volume. The status of the diagnostic vacuum systems, which are at the start of their detailed design, will be outlined and the specific features of the vacuum systems in ports and extensions will be described

  10. Modernization and refurbishment of the Central Interim Storage

    International Nuclear Information System (INIS)

    Mele, I.; Zeleznik, N.

    2002-01-01

    The Central Interim Storage for radioactive waste in Brinje, being put into operation in 1986, needs refurbishment and modernization in order to meet the up-to-date operational and safety requirements and to ensure the normal and undisturbed acceptance of radioactive waste from small producers in the future. Because of the waste, being already stored in the storage, the lack of reprocessing capacities and the lack of auxiliary room, the refurbishment and modernization is a complex problem, which needs to be addressed with care. The plan of refurbishment and modernization requires an integral approach, covering all different aspects of renewal and reconstruction. The implementation plan, however, must be based on the actual state of the storage and real conditions for the implementations: from technical to financial. In this paper the project for refurbishment and modernization of the storage, and some activities that have already been implemented, are presented.(author)

  11. Design consideration on the synchrotron ultrahigh vacuum system

    International Nuclear Information System (INIS)

    Tsujikawa, H.; Chida, K.; Mizobuchi, A.; Miyahara, A.

    1982-01-01

    Ultrahigh vacuum production for the high-energy heavy-ion accelerator poses special problems concerning beam-gas molecule and beam-wall interactions. In this paper, summary of the TARN ultrahigh vacuum system and design criteria of the synchrotron ultrahigh vacuum system are presented. On-beam pressure of 4 x 10 -11 Torr is achieved in the TARN ultrahigh vacuum system, of which experiences through the construction and the operation are described and discussed. With emphasis on the application of newly developed technique in the fabrication of vacuum chamber and ultrahigh vacuum pump for the synchrotron ultrahigh vacuum system. (author)

  12. Evaluation of three refurbished Guralp CMG-3TB seismometers.

    Energy Technology Data Exchange (ETDEWEB)

    Hart, Darren M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Merchant, Bion J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-05-01

    The overall objective of testing the Guralp CMG-3TB refurbished seismometers is to determine whether or not the refurbished sensors exhibit better data quality and require less maintenance when deployed than the original Guralp CMG-3TBs. SNL will test these 3 refurbished Guralps to verify performance specifications. The specifications that will be evaluated are sensitivity, bandwidth, self-noise, output impedance, clip-level, dynamic range over application passband, verify mathematical response and calibration response parameters for amplitude and phase.

  13. Point Lepreau refurbishment - update 5

    International Nuclear Information System (INIS)

    White, R.M.; Eagles, E.R.; Hickman, C.N.; Baker, R.; Thompson, P.D.; Howieson, J.Q.; Ichiyen, N.

    2005-01-01

    NB Power Nuclear is planning to conduct a 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) beginning in April 2008. The major activity would be the replacement of all 380 Fuel Channel and Calandria Tube assemblies and connecting feeder pipes. This activity is referred to as Retube. NB Power Nuclear would also take advantage of this outage to conduct a number of repairs, replacements, inspection and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc.). These collective activities are referred to as Refurbishment. This would allow the station to operate for an additional 25 to 30 years. The scope or the project was determined [mm the outcome of a two year study involving a detailed condition assessment of the station which examined Issues relating to ageing and obsolescence, along with a detailed review or Safety and Licensing issues associated with extended operation. The Refurbishment outage would be preceded by a detailed Engineering Project Phase that would: Finalize details of the Retube process including modeling, tooling development, site facilities and training of personnel. Perform necessary engineering activities related to design modifications. Construct the new waste storage structures to house Retube Waste and other additional waste storage structures for the extended life of the station. Setup necessary temporary construction facilities (offices, storage areas, change moms, decontamination an maintenance areas) to support Retube. Procure equipment and components. Perform detailed outage planning. Initiate development of detailed commissioning as well as lay-up, monitoring and return to service procedures. At the present time, the NB Power Nuclear Board of Directors and the New Brunswick Provincial government are reviewing a proposal for a lease arrangement from Bruce Power

  14. 21 CFR 884.5070 - Vacuum abortion system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Vacuum abortion system. 884.5070 Section 884.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 884.5070 Vacuum abortion system. (a) Identification. A vacuum abortion system is a device designed to...

  15. Loading Deformation Characteristic Simulation Study of Engineering Vehicle Refurbished Tire

    Science.gov (United States)

    Qiang, Wang; Xiaojie, Qi; Zhao, Yang; Yunlong, Wang; Guotian, Wang; Degang, Lv

    2018-05-01

    The paper constructed engineering vehicle refurbished tire computer geometry model, mechanics model, contact model, finite element analysis model, did simulation study on load-deformation property of engineering vehicle refurbished tire by comparing with that of the new and the same type tire, got load-deformation of engineering vehicle refurbished tire under the working condition of static state and ground contact. The analysis result shows that change rules of radial-direction deformation and side-direction deformation of engineering vehicle refurbished tire are close to that of the new tire, radial-direction and side-direction deformation value is a little less than that of the new tire. When air inflation pressure was certain, radial-direction deformation linear rule of engineer vehicle refurbished tire would increase with load adding, however, side-direction deformation showed linear change rule, when air inflation pressure was low; and it would show increase of non-linear change rule, when air inflation pressure was very high.

  16. Refurbishing of a Freeze Drying Machine, used in Nuclear Medicine for Radiopharmaceuticals Production

    International Nuclear Information System (INIS)

    Gaytan-Gallardo, E.; Desales-Galeana, G.

    2006-01-01

    The refurbishing of a freeze drying machine used in the radiopharmaceuticals production, applied in nuclear medicine in the Radioactive Materials Department of the Nuclear Research National Institute in Mexico (ININ in Spanish), is presented. The freeze drying machine was acquired in the 80's decade and some components started having problems. Then it was necessary to refurbish this equipment by changing old cam-type temperature controllers and outdated recording devices, developing a sophisticated software system that substitutes those devices. The system is composed by a freeze drying machine by Hull, AC output modules for improved temperature control, a commercial data acquisition card, and the software system

  17. The AGS Booster vacuum systems

    International Nuclear Information System (INIS)

    Hseuh, H.C.

    1989-01-01

    The AGS Booster is a synchrotron for the acceleration of both protons and heavy ions. The design pressure of low 10 -11 mbar is required to minimize beam loss of the partially stripped heavy ions. To remove contaminants and to reduce outgassing, the vacuum chambers and the components located in them will be chemically cleaned, vacuum fired, baked then treated with nitric oxide. The vacuum sector will be insitu baked to a minimum of 200 degree C and pumped by the combination of sputter ion pumps and titanium sublimation pumps. This paper describes the design and the processing of this ultra high vacuum system, and the performance of some half-cell vacuum chambers. 9 refs., 7 figs

  18. Automation of Aditya vacuum control system based on CODAC Core System

    Energy Technology Data Exchange (ETDEWEB)

    Raulji, Vismaysinh D., E-mail: vismay@ipr.res.in; Pujara, Harshad; Arambhadiya, Bharat; Jadeja, Kumarpalsinh; Bhatt, Shailesh; Rajpal, Rachana

    2016-11-15

    Highlights: • Monitor and control of vacuum control system based on CODAC Core System. • Communication between SIEMENS PLC and open source software EPICS. • With CODAC Core easy to configure and programming of slow controller. - Abstract: The main objective of vacuum control system is to provide ultrahigh vacuum for Aditya Tokamak operations. Aditya Vacuum vessel is having four vacuum pumping lines. To demonstrate implementation of automation; a study case is under taken by automating single Pumping Line of the Aditya vacuum system using CODAC Core System (CCS). Currently, vacuum system is operated manually. The CCS based control system allows remote control, monitoring, alarm handling of vacuum parameters. The CODAC Core System is the Linux based software package that is distributed by ITER Organization for the development of Plant System I&C software. CODAC Core System includes EPICS, CSS (Control System Studio) etc. CSS is used for HMI (Human Machine Interface), alarms and archives. SDD (Self Description Data) tool is used to configure plant system I&C. SDD Editor is an Eclipse based application to define the plant system, interface, I&C component, interfaced signals, configure variable. SCADA (Supervisory Control and Data Acquisition) system is developed in CSS. Data is transferred between PLC and CSS through EPICS. The complete system is tested with Aditya Vacuum Control System with process interlocks. Operator interface is also developed using Lab VIEW as a choice of the user. This paper will describe the salient features of the developed control system in detail.

  19. Particle contamination in vacuum systems

    International Nuclear Information System (INIS)

    Martignac, J.; Bonin, B.; Henriot, C.; Poupeau, J.P.; Koltchakian, I.; Kocic, D.; Herbeaux, Ch.; Marx, J.P.

    1996-01-01

    Many vacuum devices, like RF cavities, are sensitive to particle contamination. This fact has motivated a considerable effort of cleanliness from the SRF community. The present paper reports the first results of a general study trying to identify the most contaminating steps during assembly and vacuum operation of the cavity. The steps investigated here are gasket assembly, evacuation and venting of the vacuum system, and operation of sputter ion pumps. (author)

  20. Particle contamination in vacuum systems

    International Nuclear Information System (INIS)

    Martignac, J.; Bonin, B.; Henriot, C.; Poupeau, J.P.; Koltchakian, I.; Kocic, D.; Herbeaux, Ch.; Marx, J.P.

    1996-01-01

    Many vacuum devices, like RF cavities, are sensitive to particle contamination. This fact has motivated a considerable effort of cleanliness from the SRF community. The first results of a general study trying to identify the most contaminating steps during assembly and vacuum operation of the cavity is reported. The steps investigated here are gasket assembly, evacuation and venting of the vacuum system, and operation of sputter ion pumps. (author)

  1. Design foundation of vacuum system for electron beam machine

    International Nuclear Information System (INIS)

    Darsono; Suprapto; Djasiman

    1999-01-01

    Vacuum system is a main part of electron beam Machine because (EBM) the electron can not be produced without this vacuum. Vacuum system consists of vacuum pump, connecting pipe, valve, and vacuum gauge. The design vacuum system of EBM, basis knowledge and technology of vacuum is needed. The paper describes types of vacuum pump, calculation of pipe conductance and pumping time of vacuum system then there are used as consideration of criteria to choose vacuum pump for EBM. From the result of study, it is concluded that for EBM of 500 keV/10 mA which is going to use for wood coating and with consideration of economic and technic factor it is better to use diffusion pump. (author)

  2. BIM applied in historical building documentation and refurbishing

    Science.gov (United States)

    Cheng, H.-M.; Yang, W.-B.; Yen, Y.-N.

    2015-08-01

    Historical building conservation raises two important issues which are documentation and refurbishing. For the recording and documentation, we already have developed 3d laser scanner and such photogrammetry technology those represent a freeze object of virtual reality by digital documentation. On the other hand, the refurbished engineering of historic building is a challenge for conservation heritage which are not only reconstructing the damage part but also restoring tangible cultural heritage. 3D digital cultural heritage models has become a topic of great interest in recent years. One reason for this is the more widespread use of laser scanning and photogrammetry for recording cultural heritage sites. These technologies have made it possible to efficiently and accurately record complex structures remotely that would not have been possible with previous survey methods. In addition to these developments, digital information systems are evolving for the presentation, analysis and archival of heritage documentation.

  3. ELETTRA vacuum system

    International Nuclear Information System (INIS)

    Bernardini, M.; Daclon, F.; Giacuzzo, F.; Miertusova, J.; Pradal, F.; Kersevan, R.

    1993-01-01

    Elettra is a third-generation synchrotron light source which is being built especially for the use of high brilliance radiation from insertion devices and bending magnets. The UHV conditions in a storage ring lead to a longer beam lifetime - one of the most important criterion. The Elettra vacuum system presents some pecularities which cannot be found in any already existing machine. The final version of bending magnet vacuum chamber is presented. After chemical and thermal conditioning the specific outgassing rate of about 1.5e-12 Torr. liters sec -1 cm -2 was obtained. A microprocessor-controlled system has been developed to perform bake-out at the uniform temperature. The etched-foil type heaters are glued to the chamber and Microtherm insulation is used. UHV pumps based on standard triode sputter-ion pumps were modified with ST 707 NEG (Non Evaporable Getter) modules. A special installation enables the resistive activation of getters and significantly increases pumping speed for hydrogen and other residual gases (except methane and argon). All these technological innovations improve vacuum conditions in Elettra storage ring and consequently also the other parameters of the light source

  4. Analysis of Factors Influencing Building Refurbishment Project Performance

    Directory of Open Access Journals (Sweden)

    Ishak Nurfadzillah

    2018-01-01

    Full Text Available Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project’s performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs and complexity factors (CFs during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  5. Analysis of Factors Influencing Building Refurbishment Project Performance

    Science.gov (United States)

    Ishak, Nurfadzillah; Aswad Ibrahim, Fazdliel; Azizi Azizan, Muhammad

    2018-03-01

    Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project's performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs) and complexity factors (CFs) during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  6. Procurement specification high vacuum test chamber and pumping system

    International Nuclear Information System (INIS)

    1976-01-01

    The specification establishes requirements for a high-vacuum test chamber, associated vacuum pumps, valves, controls, and instrumentation that shall be designed and fabricated for use as a test chamber for testing a closed loop Brayton Isotope Power System (BIPS) Ground Demonstration System (GDS). The vacuum system shall include all instrumentation required for pressure measurement and control of the vacuum pumping system. A general outline of the BIPS-GDS in the vacuum chamber and the preliminary piping and instrumentation interface to the vacuum chamber are shown

  7. CERN Vacuum-System Activities during the Long Shutdown 1: The LHC Beam Vacuum

    CERN Document Server

    Baglin, V; Chiggiato, P; Jimenez, JM; Lanza, G

    2014-01-01

    After the Long Shutdown 1 (LS1) and the consolidation of the magnet bus bars, the CERN Large Hadron Collider (LHC) will operate with nominal beam parameters. Larger beam energy, beam intensities and luminosity are expected. Despite the very good performance of the beam vacuum system during the 2010-12 physics run (Run 1), some particular areas require attention for repair, consolidation and upgrade. Among the main activities, a large campaign aiming at the repair of the RF bridges of some vacuum modules is conducted. Moreover, consolidation of the cryogenic beam vacuum systems with burst disk for safety reasons is implemented. In addition, NEG cartridges, NEG coated inserts and new instruments for the vacuum system upgrade are installed. Besides these activities, repair, consolidation and upgrades of other beam equipment such as collimators, kickers and beam instrumentations are carried out. In this paper, the motivation and the description for such activities, together with the expected beam vacuum performa...

  8. Ion beam analysis of gas turbine blades: evaluation of refurbishment ...

    Indian Academy of Sciences (India)

    Scanning proton microscopy was employed to evaluate the quality of refurbishment process of gas turbine ... environment of hot combustion gases occur due to various processes, such as .... performance of refurbished blades.7. Due to the ...

  9. Ultra high vacuum systems for accelerators

    International Nuclear Information System (INIS)

    Loefgren, P.

    2001-01-01

    Full text: In order to perform controlled, stable, and reproducible experiments, several research areas today require very low pressures. Maybe the most important example is the research that is performed in storage rings and accelerators where the lifetime and stability of particle beams depends critically on the vacuum conditions. Although the vacuum requirements ultimately depend on the kind of experiments that is performed, the studies of more and more rare and exotic species in storage rings and accelerators today pushes the demands on the vacuum conditions towards lower and lower pressures. The final pressure obtained in the vacuum system can often be the key factor for the outcome of an experiment. Pioneering work in vacuum technology has therefore often been performed at storage rings and accelerator facilities around the world. In order to reach pressures in the low UHV regime and lower (below 10 -11 mbar), several aspects have to be considered which implies choosing the proper materials, pumps and vacuum gauges. In the absence of gases inleaking from the outside, the rate of gas entering a vacuum system is determined by the release of molecules adsorbed on the surfaces and the outgassing from the bulk of the vacuum chamber walls. This means that the choice of material and, equally important, the pre treatment of the material, must be such that these rates are minimised. Today the most widely used material for vacuum applications are stainless steel. Besides its many mechanical advantages, it is resistant to corrosion and oxidation. If treated correctly the major gas source in a stainless steel chamber is hydrogen outgassing from the chamber walls. The hydrogen outgassing can be decreased by vacuum firing at 950 deg. C under vacuum. In addition to choosing the right materials the choice of vacuum pumps is important for the final pressure. Since no vacuum pump is capable of taking care of all kinds of gases found in the rest gas at pressures below 10 -11

  10. Coordination Devices in the Refurbishment Design Process: A Partial-Correlation Approach

    Directory of Open Access Journals (Sweden)

    Azlan Shah Ali

    2009-12-01

    Full Text Available Building refurbishment is an important sector in the Malaysian construction industry. The increase the number of building renovations, alterations, extensions and extensive repair works contributed to the high demand for refurbishment projects. However, refurbishment projects are more difficult to manage compared to new-built, due to uncertainty factors inherent in the projects. Therefore, this paper identifies factors that contributed to uncertainty and shows how it affects design performance of refurbishment projects. This paper was also extended to the used of coordination devices to improve design performance from the effect of uncertainty in the projects. Partial-correlation technique was used in data analysis to check any significant moderate effects of coordination devices to control the negative effect of uncertainty on design performance of refurbishment projects. Four (4 coordination devices involved in the partial-correlation tests. The results concluded that the use of lateral relations and architect’s characteristics are most likely reducing the uncertainty of client attributes towards design completeness before work started on site.

  11. Report on participation of the operational dosimetry division in refurbishment of the RA reactor, Task 3.08/04-13

    International Nuclear Information System (INIS)

    Ninkovic, M.

    1963-01-01

    During the refurbishment of the RA reactor, from January to June 1963 the division of operational division had a very important role and comprehensive tasks. To enable safety of the staff it was necessary to provide protection clothes, personnel dosemeters; permanent monitoring of radiation doses; strict control of the procedures for completing the planned maintenance and repair operations to avoid contamination of the personnel and working space. The refurbishment activities described in this report are: removal of fuel from the core; refurbishment of the heavy water system; decontamination of the distillation equipment; repair of the gas system

  12. Preliminary studies for the LHCb vertex detector vacuum system

    CERN Document Server

    Doets, M; Van Bakel, N; Van den Brand, J F J; van den Brand, Jo

    2000-01-01

    We lay down some general considerations which will serve as a starting point for design studies of a realistic LHCb vertex detector vacuum system. Based on these considerations, we propose a design strategy and identify issues to be further studied. In particular we try to outline some boundary conditions imposed by LHC and LHCb on the vacuum system. We discuss two possibilities for the LHCb vertex detector vacuum system. The preferred strategy uses a differentially pumped vacuum system with the silicon detectors separated from the beam line vacuum. Some estimations on static vacuum pressures and gas flows are presented.

  13. Energetic Refurbishment of Historic Brick Buildings: Problems and Opportunities

    Science.gov (United States)

    Zagorskas, Jurgis; Paliulis, Gražvydas Mykolas; Burinskienė, Marija; Venckauskaitė, Jūratė

    2013-12-01

    Building standards for energy effectiveness are increasing constantly and the market follows these changes by constructing new buildings in accordance with standards and refurbishment of the existing housing stock. Comprehensive trends in European construction market show tremendous increase in building retrofit works. It can be predicted that after the end of this decade, more than half of the construction works in European cities will be taking place in existing buildings, pushing the construction of new buildings to a less important role. Such a growth in building refurbishment works is creating a demand for suitable materials, retrofitting techniques and research. The differences between refurbishment of new-build projects and historical or valuable buildings are insufficiently recognized - mostly the buildings without further cultural preservation requirements are studied. This article covers the theme of refurbishment measures in historical buildings - the specific measures like inside insulation which are allowed due to the valuable façade or other heritage preservation requirements. An overview of other innovative methods for energy saving in existing buildings and their potential is given.

  14. Refurbishment of the regulating and control equipment, Task 3.08/04-05

    International Nuclear Information System (INIS)

    Nikolic, M.; Popovic, B.

    1963-01-01

    In addition to the planned refurbishment and maintenance of the RA reactor control and regulating systems, this report describes the maintenance of the reactor protection and safety systems. According to the instructions included in this report the components of these systems were tested to verify their reliability

  15. Vacuum systems for the ILC helical undulator

    CERN Document Server

    Malyshev, O B; Clarke, J A; Bailey, I R; Dainton, J B; Malysheva, L I; Barber, D P; Cooke, P; Baynham, E; Bradshaw, T; Brummitt, A; Carr, S; Ivanyushenkov, Y; Rochford, J; Moortgat-Pick, G A

    2007-01-01

    The International Linear Collider (ILC) positron source uses a helical undulator to generate polarized photons of ∼10MeV∼10MeV at the first harmonic. Unlike many undulators used in synchrotron radiation sources, the ILC helical undulator vacuum chamber will be bombarded by photons, generated by the undulator, with energies mostly below that of the first harmonic. Achieving the vacuum specification of ∼100nTorr∼100nTorr in a narrow chamber of 4–6mm4–6mm inner diameter, with a long length of 100–200m100–200m, makes the design of the vacuum system challenging. This article describes the vacuum specifications and calculations of the flux and energy of photons irradiating the undulator vacuum chamber and considers possible vacuum system design solutions for two cases: cryogenic and room temperature.

  16. Vacuum and fueling systems for the IGNITEX experiment

    International Nuclear Information System (INIS)

    Hallock, G.; Booth, W.D.; Carrera, R.

    1989-01-01

    The results of preliminary studies of the vacuum and fueling requirements for the proposed fusion ignition experiment IGNITEX are presented. An initial design for the vacuum pumping and plasma fueling system is given. The IGNITEX vacuum system must meet the demands of providing sufficient pumping speed to reach a base pressure of about 10 -8 Torr to provide a clean environment for plasma formation. In addition, the pumping speed should meet the requirements during the discharge cleaning cycle. The design of the vacuum pumping system including layout and location and structure of the vacuum ports required for pumping and diagnostic access is presented. Two different types of pumping systems - turbomolecular pumps and cryrogenic pumps have been considered. The advantages and disadvantages of each type of pumping system are analyzed

  17. Refurbishment of BR2 (Phase 4 and 5)

    International Nuclear Information System (INIS)

    Gubel, P.; Dekeyser, J.; Van der Auwera, J.

    1998-01-01

    The extensive refurbishment of the BR-2 materials testing reactor should allow another 10 to 15 years of continued operation. The refurbishment programme is required in order to comply with modern safety standards, to enhance the reliability of operation, and to compensate for the ageing of the installations of a facility that has reached about 35 years of intensive service. The main objectives and achievements of phase 4 and 5 are described

  18. Turbomolecular pump vacuum system for the Princeton Large Torus

    International Nuclear Information System (INIS)

    Dylla, H.F.

    1977-10-01

    A turbomolecular pump vacuum system has been designed and installed on the Princeton Large Torus (PLT). Four vertical shaft, oil-bearing, 1500 l/s turbomolecular pumps have been interfaced to the 6400 liter PLT Vacuum vessel to provide a net pumping speed of 3000 l/s for H 2 . The particular requirements and problems of tokamak vacuum systems are enumerated. A vacuum control system is described which protects the vacuum vessel from contamination, and protects the turbomolecular pumps from damage under a variety of possible failure modes. The performance of the vacuum system is presented in terms of pumping speed measurements and residual gas behavior

  19. Spent nuclear fuel project cold vacuum drying facility vacuum and purge system design description

    Energy Technology Data Exchange (ETDEWEB)

    IRWIN, J.J.

    1998-11-30

    This document provides the System Design Description (SDD) for the Cold Vacuum Drying Facility (CVDF) Vacuum and Purge System (VPS) . The SDD was developed in conjunction with HNF-SD-SNF-SAR-O02, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998), The HNF-SD-SNF-DRD-002, 1998, Cold Vacuum Drying Facility Design Requirements, and the CVDF Design Summary Report. The SDD contains general descriptions of the VPS equipment, the system functions, requirements and interfaces. The SDD provides references for design and fabrication details, operation sequences and maintenance. This SDD has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  20. Spent nuclear fuel project cold vacuum drying facility vacuum and purge system design description

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    1998-01-01

    This document provides the System Design Description (SDD) for the Cold Vacuum Drying Facility (CVDF) Vacuum and Purge System (VPS) . The SDD was developed in conjunction with HNF-SD-SNF-SAR-O02, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998), The HNF-SD-SNF-DRD-002, 1998, Cold Vacuum Drying Facility Design Requirements, and the CVDF Design Summary Report. The SDD contains general descriptions of the VPS equipment, the system functions, requirements and interfaces. The SDD provides references for design and fabrication details, operation sequences and maintenance. This SDD has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  1. Computer Refurbishment

    International Nuclear Information System (INIS)

    Ichiyen, Norman; Chan, Dominic; Thompson, Paul

    2004-01-01

    The major activity for the 18-month refurbishment outage at the Point Lepreau Generating Station is the replacement of all 380 fuel channel and calandria tube assemblies and the lower portion of connecting feeder pipes. New Brunswick Power would also take advantage of this outage to conduct a number of repairs, replacements, inspections and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc.). This would allow for an additional 25 to 30 years. Among the systems to be replaced are the PDC's for both shutdown systems. Assessments have been completed for both the SDS1 and SDS2 PDC's, and it has been decided to replace the SDS2 PDCs with the same hardware and software approach that has been used successfully for the Wolsong 2, 3, and 4 and the Qinshan 1 and 2 SDS2 PDCs. For SDS1, it has been decided to use the same software development methodology that was used successfully for the Wolsong and Qinshan called the I A and to use a new hardware platform in order to ensure successful operation for the 25-30 year station operating life. The selected supplier is Triconex, which uses a triple modular redundant architecture that will enhance the robustness/fault tolerance of the design with respect to equipment failures

  2. Comparison of vacuum rise time, vacuum limit accuracy, and occlusion break surge of 3 new phacoemulsification systems.

    Science.gov (United States)

    Han, Young Keun; Miller, Kevin M

    2009-08-01

    To compare vacuum rise time, vacuum limit accuracy, and occlusion break surge of 3 new phacoemulsification machines. Jules Stein Eye Institute and Department of Ophthalmology, David Geffen School of Medicine at UCLA, Los Angeles, California, USA. The vacuum rise time under normal and enhanced aspiration modes, vacuum limit accuracy, and occlusion break surge of the Infiniti Vision System, Stellaris Vision Enhancement System, and WhiteStar Signature Phacoemulsification System were tested. Vacuum rise time and limit accuracy were measured at limit settings of 400 mm Hg and 600 mm Hg. Surge area was recorded at vacuum limit settings of 200 mm Hg, 300 mm Hg, 400 mm Hg, and 500 mm Hg. The Infiniti had the fastest vacuum rise times under normal and enhanced aspiration modes. At 4 seconds, the vacuum limit accuracy was greatest with the Infiniti at the 400 mm Hg limit and the Signature at the 600 mm Hg limit. The Stellaris did not reach either vacuum target. The Infiniti performed better than the other 2 machines during testing of occlusion break surge at all vacuum limit settings above 200 mm Hg. Under controlled laboratory test conditions, the Infiniti had the fastest vacuum rise time, greatest vacuum limit accuracy at 400 mm Hg, and least occlusion break surge. These results can be explained by the lower compliance of the Infiniti system.

  3. HIGH PRODUCTIVITY VACUUM BLASTING SYSTEM

    International Nuclear Information System (INIS)

    McPhee, William S.

    1999-01-01

    The objective of this project is to improve the productivity and lower the expense of existing vacuum blasting technology. This technology is used to remove radioactive contamination, PCBs, and lead-based paint and provides worker protection by continuously recycling the material and dust for the decontamination tasks. The proposed work would increase the cleaning rate and provide safe and cost-effective decontamination of the DOE sites. This work focuses on redesigning and improving existing vacuum blasting technology including blast head nozzles, ergonomic handling of the blast head by reducing its weight; brush-ring design, vacuum level regulator, efficiency of the dust separator, and operational control sensors. The redesign is expected to enhance the productivity and economy of the vacuum blasting system by at least 50% over current vacuum blasting systems. There are three phases in the project. Phase I consists of developing and testing mathematical models. Phase II consists of pre-prototype design and fabrication and pre-prototype unit testing. Phase III consists of prototype design and field verification testing. In phase I, mathematical models are developed and analyzed for the nozzle, blast head, wind curtain, and dust separator, first as individual devices and then combined as an integrated model. This allows study of respective airflow and design parameters. The Contractor shall, based on the results of the mathematical modeling studies, design experimental models of the components and test these models. In addition, the Contractor shall develop sensors to detect the relationship of the blast head to the blast surfaces and controls to minimize the dependency on an operator's skill and judgment to obtain optimum positioning, as well as real-time characterization sensors to determine as the blast head is moving the depth to which coatings must be removed, thereby improving production and minimizing waste. In phase II, the Contractor shall design and

  4. LECA refurbishment project or how to get ready for the next ten years

    Energy Technology Data Exchange (ETDEWEB)

    Boussard, Francois; Bois, Dominique; Blanc, Jean Yves

    2005-01-01

    Around 1995, CEA decided a strategy for its hot laboratories: Closing LAMA - Grenoble and LHA - Saclay, after RM2 - Fontenay-aux-Roses. Refurbishing and gathering irradiated material studies in LECI - Saclay. Refurbishing LECA - Cadarache for irradiated fuel examinations. Reprocessing pilot experiments being located in Atalante - Marcoule. Started up in 1964, LECA has got an exploitation license up to August 2005. In 2001, safety authorities agreed to extend it up to 2015, provided an extensive refurbishment is undertaken which includes civil engineering works to achieve the building earthquake resistance, based on 3D-computations and withstanding maximum historically likely earthquake, improving confinement by decontaminating, adding steel boxes inside cells, changing ventilation system and creating a mobile upper cell on the cell roof, changing power supplies, shielded glasses and most manipulators, improving travelling crane, fire protection, radioactivity monitoring and alarms, installing a new device for characterizing and evacuating wastes, decreasing the fissile mass stored inside the facility (source term). Most of the work should be ended by the end of 2005. Afterwards five cells, which do not withstand earthquake, will be deconstructed within 3 years. By mid 2004, 60 % of tasks are completed and all contracts are awarded. The total final cost is 97 M Euro, 80% of which regarding the only LECA refurbishment. (Author)

  5. Vacuum system of SST-1 Tokamak

    International Nuclear Information System (INIS)

    Khan, Ziauddin; Pathan, Firozkhan; George, Siju; Semwal, Pratibha; Dhanani, Kalpesh; Paravastu, Yuvakiran; Thankey, Prashant; Ramesh, Gattu; Himabindu, Manthena; Pradhan, Subrata

    2013-01-01

    Highlights: ► Air leaks developed during ongoing SST-1 cooldown campaign were detected online using RGA. ► The presence of N 2 and O 2 gases with the ratio of their partial pressures with ∼3.81:1 confirmed the air leaks. ► Baking of SST-1 was done efficiently by flowing hot N 2 gas in C-channels welded on inner surfaces without any problem. ► In-house fabricated demountable bull nose couplers were demonstrated for high temperature and pressure applications. ► Cryopumping effect was observed when liquid helium cooled superconducting magnets reached below 63 K. -- Abstract: Vacuum chambers of Steady State Superconducting (SST-1) Tokamak comprises of the vacuum vessel and the cryostat. The plasma will be confined inside the vacuum vessel while the cryostat houses the superconducting magnet systems (TF and PF coils), LN 2 cooled thermal shields and hydraulics for these circuits. The vacuum vessel is an ultra-high (UHV) vacuum chamber while the cryostat is a high-vacuum (HV) chamber. In order to achieve UHV inside the vacuum vessel, it would be baked at 150 °C for longer duration. For this purpose, U-shaped baking channels are welded inside the vacuum vessel. The baking will be carried out by flowing hot nitrogen gas through these channels at 250 °C at 4.5 bar gauge pressure. During plasma operation, the pressure inside the vacuum vessel will be raised between 1.0 × 10 −4 mbar and 1.0 × 10 −5 mbar using piezoelectric valves and control system. An ultimate pressure of 4.78 × 10 −6 mbar is achieved inside the vacuum vessel after 100 h of pumping. The limitation is due to the development of few leaks of the order of 10 −5 mbar l/s at the critical locations of the vacuum vessel during baking which was confirmed with the presence of nitrogen gas and oxygen gas with the ratio of ∼3.81:1 indicating air leak. Similarly an ultimate vacuum of 2.24 × 10 −5 mbar is achieved inside the cryostat. Baking of the vacuum vessel up to 110 °C with ±10

  6. An Overview of Ageing Management and Refurbishment of Research Reactors at Trombay

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, R. C.; Raina, V. K. [Bhabha Atomic Research Centre, Mumbai (India)

    2014-08-15

    Three nuclear research reactors have been in operation at Bhabha Atomic Research Centre, Mumbai, India. India has a rich experience of about 120 research reactor operating years including ageing management. A well structured programme is in force for plant life management, refurbishment and upgrading reactors in operation. Apsara, commissioned in August 1956, was the first research reactor. Apsara is a 1 MW{sub th} swimming pool type of reactor with a movable core loaded with enriched uranium fuel and immersed in demineralized light water pool, which serves as coolant, moderator and reflector besides providing radiation shielding. Apsara was shut down during May 2009 for partial decommissioning and upgrading to a 2 MW reactor with several safety upgrades, e.g. a LEU based reactor core with higher neutron flux, a new reactor building meeting seismic qualification criteria and two independent shutdown devices. Cirus, a 40 MW{sub th} tank type reactor utilizing heavy water as moderator, graphite as reflector, demineralized light water as primary coolant and natural uranium metal as fuel; has been in operation since 1960. After about three decade of operation, the availability factor started declining mainly due to outage of equipment exhibiting signs of ageing. After ageing studies and performance review, refurbishment requirements were identified. A programme for refurbishment was drawn that included safety upgrades like civil repairs to the emergency storage reservoir to meet seismic qualification criteria and a new iodine removal system for better efficiency. The reactor was shut down during 1997 for execution of this refurbishment programme. After completion of refurbishment, the reactor was brought back into operation during 2003. It has completed about seven years of safe operation after refurbishment with a significant increase in availability factor from 70% to about 90%. The reactor was permanently shut down during December 2010. The reactor core was unloaded

  7. Past, Present and Future of Linac 2 Vacuum System

    CERN Document Server

    Mahner, E

    2011-01-01

    This note aims to review the past, present, and future operation of CERN's Linac 2 vacuum system. The machine vacuum system layout with its major components is summarized. Operational problems arising in 2006 yielded to a leak test campaign of the whole machine, which detected a new, major leak on tank 3. Details about the mitigation of this leak are described as well as additional diagnostics installed during shutdown 2006/07. The pressure evolution of the most critical vacuum sector is analyzed. A statistics of vacuum system faults observed since 2000 is presented and compared with other systems. Finally, a perspective for the vacuum system operation until 2017/18 is outlined.

  8. Vacuum system operating experience review for fusion applications

    International Nuclear Information System (INIS)

    Cadwallader, L.C.

    1994-03-01

    This report presents a review of vacuum system operating experiences from particle accelerator, fusion experiment, space simulation chamber, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of vacuum system component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with vacuum systems are discussed, including personnel safety, foreign material intrusion, and factors relevant to vacuum systems being the primary confinement boundary for tritium and activated dusts. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor

  9. Characteristics of the ISABELLE vacuum system

    International Nuclear Information System (INIS)

    Aggus, J.R.; Edwards, D. Jr.; Halama, H.J.; Herrera, J.C.

    1977-01-01

    A discussion is given of the complete vacuum system of ISABELLE, emphasizing those design characteristics dictated by high vacuum, the avoidance of beam current loss, and the reduction of background. The experimental and theoretical justifications for the design are presented

  10. Analytical and numerical tools for vacuum systems

    CERN Document Server

    Kersevan, R

    2007-01-01

    Modern particle accelerators have reached a level of sophistication which require a thorough analysis of all their sub-systems. Among the latter, the vacuum system is often a major contributor to the operating performance of a particle accelerator. The vacuum engineer has nowadays a large choice of computational schemes and tools for the correct analysis, design, and engineering of the vacuum system. This paper is a review of the different type of algorithms and methodologies which have been developed and employed in the field since the birth of vacuum technology. The different level of detail between simple back-of-the-envelope calculations and more complex numerical analysis is discussed by means of comparisons. The domain of applicability of each method is discussed, together with its pros and cons.

  11. Vacuum system of SST-1 Tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Ziauddin, E-mail: ziauddin@ipr.res.in [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar 382 428 (India); Pathan, Firozkhan; George, Siju; Semwal, Pratibha; Dhanani, Kalpesh; Paravastu, Yuvakiran; Thankey, Prashant; Ramesh, Gattu; Himabindu, Manthena; Pradhan, Subrata [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar 382 428 (India)

    2013-10-15

    Highlights: ► Air leaks developed during ongoing SST-1 cooldown campaign were detected online using RGA. ► The presence of N{sub 2} and O{sub 2} gases with the ratio of their partial pressures with ∼3.81:1 confirmed the air leaks. ► Baking of SST-1 was done efficiently by flowing hot N{sub 2} gas in C-channels welded on inner surfaces without any problem. ► In-house fabricated demountable bull nose couplers were demonstrated for high temperature and pressure applications. ► Cryopumping effect was observed when liquid helium cooled superconducting magnets reached below 63 K. -- Abstract: Vacuum chambers of Steady State Superconducting (SST-1) Tokamak comprises of the vacuum vessel and the cryostat. The plasma will be confined inside the vacuum vessel while the cryostat houses the superconducting magnet systems (TF and PF coils), LN{sub 2} cooled thermal shields and hydraulics for these circuits. The vacuum vessel is an ultra-high (UHV) vacuum chamber while the cryostat is a high-vacuum (HV) chamber. In order to achieve UHV inside the vacuum vessel, it would be baked at 150 °C for longer duration. For this purpose, U-shaped baking channels are welded inside the vacuum vessel. The baking will be carried out by flowing hot nitrogen gas through these channels at 250 °C at 4.5 bar gauge pressure. During plasma operation, the pressure inside the vacuum vessel will be raised between 1.0 × 10{sup −4} mbar and 1.0 × 10{sup −5} mbar using piezoelectric valves and control system. An ultimate pressure of 4.78 × 10{sup −6} mbar is achieved inside the vacuum vessel after 100 h of pumping. The limitation is due to the development of few leaks of the order of 10{sup −5} mbar l/s at the critical locations of the vacuum vessel during baking which was confirmed with the presence of nitrogen gas and oxygen gas with the ratio of ∼3.81:1 indicating air leak. Similarly an ultimate vacuum of 2.24 × 10{sup −5} mbar is achieved inside the cryostat. Baking of the

  12. Refurbishment of the Primary Cooling System of the Puspati Triga Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Ramli, S.; Zakaria, M. F.; Masood, Z. [Malaysian Nuclear Agency, Kajang (Malaysia)

    2014-08-15

    The refurbishment of the 27 year old primary cooling system of the 1 MW PUSPATI TRIGA reactor was completed in April 2010 over an eight month outage. The project was implemented with the dual objective of meeting current user needs as well as a future reactor core power upgrade. Hence the cooling system was partly modernized to cater for a 3 MW{sub th} reactor by installing higher capacity heat exchangers and pumps while maintaining the piping and valve sizes. The old 1 MW tube and shell heat exchanger, which had lost 25% of its heat exchange capacity, was replaced with two 1.5 MW plate type heat exchangers. Several manually operated valves were replaced with motorized units to allow remote operation from the control room. The installed cooling system was flushed with distilled water and then subjected to hydrostatic pressure tests. In the cold run test, the system was operated for an hour for every pump and heat exchanger combination while all operating parameters were checked. In the hot run test, the same was done at four levels of increasing reactor power, and dose measurements were also recorded. The paper gives the design, installation, testing and commissioning details of the project. (author)

  13. Troubleshooting vacuum systems steam turbine surface condensers and refinery vacuum towers

    CERN Document Server

    Lieberman, Norman P

    2012-01-01

    Vacuum systems are in wide spread use in the petrochemical plants, petroleum refineries and power generation plants. The existing texts on this subject are theoretical in nature and only deal with how the equipment functions when in good mechanical conditions, from the viewpoint of the equipment vendor.  In this much-anticipated volume, one of the most well-respected and prolific process engineers in the world takes on troubleshooting vacuum systems, and especially steam ejectors, an extremely complex and difficult subject that greatly effects the profitability of the majority of the world'

  14. Wireless Integrated Microelectronic Vacuum Sensor System

    Science.gov (United States)

    Krug, Eric; Philpot, Brian; Trott, Aaron; Lawrence, Shaun

    2013-01-01

    NASA Stennis Space Center's (SSC's) large rocket engine test facility requires the use of liquid propellants, including the use of cryogenic fluids like liquid hydrogen as fuel, and liquid oxygen as an oxidizer (gases which have been liquefied at very low temperatures). These fluids require special handling, storage, and transfer technology. The biggest problem associated with transferring cryogenic liquids is product loss due to heat transfer. Vacuum jacketed piping is specifically designed to maintain high thermal efficiency so that cryogenic liquids can be transferred with minimal heat transfer. A vacuum jacketed pipe is essentially two pipes in one. There is an inner carrier pipe, in which the cryogenic liquid is actually transferred, and an outer jacket pipe that supports and seals the vacuum insulation, forming the "vacuum jacket." The integrity of the vacuum jacketed transmission lines that transfer the cryogenic fluid from delivery barges to the test stand must be maintained prior to and during engine testing. To monitor the vacuum in these vacuum jacketed transmission lines, vacuum gauge readings are used. At SSC, vacuum gauge measurements are done on a manual rotation basis with two technicians, each using a handheld instrument. Manual collection of vacuum data is labor intensive and uses valuable personnel time. Additionally, there are times when personnel cannot collect the data in a timely fashion (i.e., when a leak is detected, measurements must be taken more often). Additionally, distribution of this data to all interested parties can be cumbersome. To simplify the vacuum-gauge data collection process, automate the data collection, and decrease the labor costs associated with acquiring these measurements, an automated system that monitors the existing gauges was developed by Invocon, Inc. For this project, Invocon developed a Wireless Integrated Microelectronic Vacuum Sensor System (WIMVSS) that provides the ability to gather vacuum

  15. Re-circulating linac vacuum system

    International Nuclear Information System (INIS)

    Wells, Russell P.; Corlett, John N.; Zholents, Alexander A.

    2003-01-01

    The vacuum system for a proposed 2.5 GeV, 10ΜA recirculating linac synchrotron light source [1] is readily achievable with conventional vacuum hardware and established fabrication processes. Some of the difficult technical challenges associated with synchrotron light source storage rings are sidestepped by the relatively low beam current and short beam lifetime requirements of a re-circulating linac. This minimal lifetime requirement leads directly to relatively high limits on the background gas pressure through much of the facility. The 10ΜA average beam current produces very little synchrotron radiation induced gas desorption and thus the need for an ante-chamber in the vacuum chamber is eliminated. In the arc bend magnets, and the insertion devices, the vacuum chamber dimensions can be selected to balance the coherent synchrotron radiation and resistive wall wakefield effects, while maintaining the modest limits on the gas pressure and minimal outgassing

  16. The BR2 refurbishment: from concept to achievements

    International Nuclear Information System (INIS)

    Gubel, P.

    2002-01-01

    The BR2 reactor is one of the major research reactors in the world. It's operation started in the early 1960's. Two major refurbishments operation have been carried out since then. The report gives an overview of the methodology and inspections, which resulted in a refurbishment action plan. The main realizations and complementary actions required by the Licensing Authorities are summarized. Finally the operation experience feedback, four years now after start-up, is briefly discussed as well as the main aspects of the present safety reassessment [ru

  17. Refurbishment and safety up-gradation of Cirus Reactor

    International Nuclear Information System (INIS)

    Rao, D.V.H.

    2004-01-01

    Cirus, a 40 MWth, vertical tank type research reactor, having a wide range of research facilities, was commissioned in 1960. This research facility has been operated and utilized extensively for nearly four decades. With a view to assess the residual life of the reactor, detailed ageing studies were carried out. Based on this, refurbishment work for life extension was undertaken. During this work, additional safety features were incorporated to improve the overall safety of the reactor. This lecture details the methodologies used for ageing studies and refurbishment activities for life extension with enhanced safety. (author)

  18. Vacuum system transient simulator and its application to TFTR

    International Nuclear Information System (INIS)

    Sredniawski, J.

    1978-01-01

    The vacuum system transient simulator (VSTS) models transient gas transport throughout complex networks of ducts, valves, traps, vacuum pumps, and other related vacuum system components. VSTS is capable of treating gas models of up to 10 species, for all flow regimes from pure molecular to continuum. Viscous interactions between species are considered as well as non-uniform temperature of a system. Although this program was specifically developed for use on the Tokamak Fusion Test Reactor (TFTR) project at Princeton, it is a generalized tool capable of handling a broad range of vacuum system problems. During the TFTR engineering design phase, VSTS has been used in many applications. Two applications selected for presentation are: (1) torus vacuum pumping system performance between 400 Ci tritium pulses and (2) tritium backstreaming to neutral beams during pulses

  19. Vacuum system transient simulator and its application to TFTR

    International Nuclear Information System (INIS)

    Sredniawski, J.

    1977-01-01

    The vacuum system transient simulator (VSTS) models transient gas transport throughout complex networks of ducts, valves, traps, vacuum pumps, and other related vacuum system components. VSTS is capable of treating gas models of up to 10 species, for all flow regimes from pure molecular to continuum. Viscous interactions between species are considered as well as non-uniform temperature of a system. Although this program was specifically developed for use on the Tokamak Fusion Test Reactor (TFTR) project at Princeton, it is a generalized tool capable of handling a broad range of vacuum system problems. During the TFTR engineering design phase, VSTS has been used in many applications. Two applications selected for presentation are: torus vacuum pumping system performance between 400 Ci tritium pulses and tritium backstreaming to neutral beams during pulses

  20. Cold Vacuum Drying Instrument Air System Design Description. System 12

    International Nuclear Information System (INIS)

    SHAPLEY, B.J.; TRAN, Y.S.

    2000-01-01

    This system design description (SDD) addresses the instrument air (IA) system of the spent nuclear fuel (SNF). This IA system provides instrument quality air to the Cold Vacuum Drying (CVD) Facility. The IA system is a general service system that supports the operation of the heating, ventilation, and air conditioning (HVAC) system, the process equipment skids, and process instruments in the CVD Facility. The following discussion is limited to the compressor, dryer, piping, and valving that provide the IA as shown in Drawings H-1-82222, Cold Vacuum Drying Facility Mechanical Utilities Compressed and Instrument Air PandID, and H-1.82161, Cold Vacuum Drying Facility Process Equipment Skid PandID MCO/Cusk Interface. Figure 1-1 shows the physical location of the 1A system in the CVD Facility

  1. ISR vacuum system

    CERN Multimedia

    CERN PhotoLab

    1970-01-01

    A pressure of 5 x 10-11 Torr has been obtained repreatedly in this pilot section of the ISR vacuum system. The pilot section is 45 m long is pumped by 9 sputter-ion pumps pf 350 l/s pumping speed, and is baked out at 200 degrees C before each pump down.

  2. Design and construction of vacuum control system on EAST

    International Nuclear Information System (INIS)

    Wang, L.; Zhang, Y.; Hu, Q.S.; Wang, X.M.; Zhang, X.D.; Hu, J.S.; Yang, Y.; Gu, X.M.

    2008-01-01

    The construction of experimental advanced superconducting tokamak (EAST) was finished at the end of 2006 in Hefei, China. Its vacuum system, an important subsystem, has been commissioned in February 2006. The design and construction of this vacuum control system are described in this paper. The requirements for remote automation, distributed control and centralized management, high reliability and expansibility have been taken into account in the design. There are three levels of control in vacuum control system. The bottom level control is performed on the local instruments manually; the medium level control is based on Siemens S7-400 PLC; the top level control is conducted on IPCs with communication through profi b us network. In addition remote handling and centralized monitoring could be realized by a remote control server. The control system could achieve pumping and fueling of the whole vacuum system. Besides that, it also includes the data acquisition of the pressure and temperature. The details are discussed on the monitoring of vacuum system states including cooling water, power and compressed air, etc., safeguards of plasma chamber and cryostat chamber and vacuum equipments, choosing of control modes corresponding to the plasma discharge and wall conditioning. At the end, the parts of EAST device protection system related to vacuum and gas injection system will also be introduced

  3. Impact of flow accelerated corrosion (FAC) on feeder refurbishment planning

    International Nuclear Information System (INIS)

    Jyrkama, M.; Pandey, M.

    2010-01-01

    Feeder wall thinning due to flow accelerated corrosion (FAC) may result in a large number of feeder replacements in the future. In this study, the process of FAC is modelled using a probabilistic approach and used to predict the expected number of degraded feeders and their replacements in the future. Because of the high cost associated with feeder replacements, it may be optimal to replace the entire feeder population during a single refurbishment outage when the unit cost of replacement is likely to be less. The results of this study demonstrate, however, that the unit cost of feeder replacement must be sufficiently lower than the standard replacement cost and the refurbishment performed at an optimal time to realize the economic benefits associated with the refurbishment. (author)

  4. The HIE-ISOLDE Vacuum System

    CERN Document Server

    Vandoni, G; Radwan, K; Chiggiato, P

    2014-01-01

    The High Intensity and Energy Isolde (HIE-Isolde) project aims at increasing the energy and intensity of the radioactive ion beams (RIB) delivered by the present Rex-Isolde facility. Energy up to 10MeV/amu will be reached by a new post-accelerating, superconducting (SC) linac. Beam will be delivered via a HEBT to three experimental stations for nuclear physics. To keep the SC linac compact and avoid cold-warm transitions, the cryomodules feature a common beam and insulation vacuum. Radioactive ion beams require a hermetically sealed vacuum, with transfer of the effluents to the nuclear ventilation chimney. Hermetically sealed, dry, gas transfer vacuum pumps are preferred to gas binding pumps, for an optimized management of radioactive contamination risk during maintenance and intervention. The vacuum system of the SC-linac is isolated by two fast valves, triggered by fast reacting cold cathode gauges installed on the warm linac, the HEBT and the experimental stations. Rough pumping is distributed, while the H...

  5. Energetic Refurbishment of Historic Brick Buildings

    DEFF Research Database (Denmark)

    Zagorskas, Jurgis; Mykolas Paliulis, Grazvydas; Burinskiene, Marija

    2013-01-01

    Building standards for energy effectiveness are increasing constantly and the market follows these changes by constructing new buildings in accordance with standards and refurbishment of the existing housing stock. Comprehensive trends in European construction market show tremendous increase...

  6. Embalse refurbishment - aging, safety assessment, and the path forward

    International Nuclear Information System (INIS)

    Sainz, R.; Fornero, D.; Diaz, G.; Gold, R.; Dam, R.; McCrea, L.

    2009-01-01

    The Embalse Nuclear Power Station has been engaged in Pre-refurbishment activities for two years. The primary focus has been on the first phase Pre-Project Condition Assessment Program (PCAP). This phase of the Refurbishment and Life Extension (RLE) project consists of all preparatory activities that are required to define the refurbishment scope and costs, and for input into the utility business case for the RLE project. As part of an overall Plant Life Management (PLiM) program, the following activities have been performed: 1. Systematic and rigorous condition assessments / life assessments (including Health Prognosis and Recommendations); 2. Assessment of design and safety analysis features at Embalse, relative to current technology and licensing practices; 3. Pre-Project activities related to: Retube, Steam Generator replacement, and Digital Control Computer (DCC) replacement. The program has been a joint effort of Embalse NPS-NASA, AECL, ANSALDO and several other support organizations. Details of the planned program were addressed previously in a paper presented at the 28th CNS Conference (2007), entitled 'Embalse Refurbishment - Pre-Project Condition Assessment Phase 1'. Since that time, significant progress has been made towards completing the assessment program and planning for the next steps. This paper presents the progress of Refurbishment and Life Extension (RLE) Program at Embalse Nuclear Power Station with specific emphasis on the PCAP efforts. This includes a discussion of the benefits and lessons learned from RLE project's perspective, and an overview of some key conclusions of the aging assessments. Finally, this paper outlines the path forward. It should be noted that results of assessments presented in this paper are very conservative. This is driven largely by the fact that there are currently uncertainties in equipment condition that can be addressed through the activities recommended as an outcome of these assessments. (author)

  7. Understanding valve program complexity in a refurbishment environment - learning from the past

    International Nuclear Information System (INIS)

    Roth, H.E.

    2012-01-01

    The complexity of Valve Program development, planning, execution and management in a refurbishment environment is an enormous undertaking requiring the proper coordination and integration of many moving parts. As such, lack of attention and understanding of this complexity has led to significant cost and schedule overruns in past refurbishment projects in the province. OPEX indicates the challenges in completing valve scope during refurbishments are related but not limited to; lack of detailed condition assessments, improper scope development, insignificant strategic approach to work task planning, scheduling and procurement, absence of contingency planning for common ‘as found’ conditions during execution, lack of proper training requirements, etc. In addition, past contracting strategies to employ numerous companies in collaboration to complete such a complex and specialized program, has resulted in further complications surrounding the management and integration of multiple quality programs and internal company processes. Finally, the aftermath of such fragmented projects results in an absolute closeout nightmare, often times taking years to locate, sift through and re-integrate pertinent information back into customer systems. Valve Program complexity cannot be understood by just anyone, only those that have lived through a refurbishment project and experienced the challenges mentioned above have the knowledge, skill, and ability to appreciate how to tactically apply past learning to realize future improvements. Furthermore, effective contractor-customer collaboration is crucial; true and in-depth knowledge and understanding of the customer quality programs, engineering and work management processes, configuration management requirements, and most importantly the imperative significance of nuclear safety, are all essential components to ensure overall alignment and program success. (author)

  8. Understanding valve program complexity in a refurbishment environment - learning from the past

    Energy Technology Data Exchange (ETDEWEB)

    Roth, H.E. [Babcock & Wilcox Canada Ltd., Cambridge, Ontario (Canada)

    2012-07-01

    The complexity of Valve Program development, planning, execution and management in a refurbishment environment is an enormous undertaking requiring the proper coordination and integration of many moving parts. As such, lack of attention and understanding of this complexity has led to significant cost and schedule overruns in past refurbishment projects in the province. OPEX indicates the challenges in completing valve scope during refurbishments are related but not limited to; lack of detailed condition assessments, improper scope development, insignificant strategic approach to work task planning, scheduling and procurement, absence of contingency planning for common ‘as found’ conditions during execution, lack of proper training requirements, etc. In addition, past contracting strategies to employ numerous companies in collaboration to complete such a complex and specialized program, has resulted in further complications surrounding the management and integration of multiple quality programs and internal company processes. Finally, the aftermath of such fragmented projects results in an absolute closeout nightmare, often times taking years to locate, sift through and re-integrate pertinent information back into customer systems. Valve Program complexity cannot be understood by just anyone, only those that have lived through a refurbishment project and experienced the challenges mentioned above have the knowledge, skill, and ability to appreciate how to tactically apply past learning to realize future improvements. Furthermore, effective contractor-customer collaboration is crucial; true and in-depth knowledge and understanding of the customer quality programs, engineering and work management processes, configuration management requirements, and most importantly the imperative significance of nuclear safety, are all essential components to ensure overall alignment and program success. (author)

  9. PC driven integrated vacuum system

    International Nuclear Information System (INIS)

    Curuia, Marian; Culcer, Mihai; Brandea, Iulian; Anghel, Mihai

    2001-01-01

    The monitoring of industrial plants by virtual instrumentation represents the most modern trend in the domain of electronic equipment. The integrated vacuum system presented here has several facilities, including the automated data storing of measurement results on hard disk and providing warning messages for operators when the measured parameters are lower or higher upper than the fixed values. The system can also work stand-alone, receiving the commands from the keyboards placed on his front panel but, when it is included in a automation complex system, a remote control from PC is necessary . Both parts of the system, power supply unit for turbo-molecular pump and the vacuum gage, are controlled by an 80C31 microcontroller. Because this microcontroller has a built-in circuitry for a serial communication, we established a serial communication between the PC and the power supply unit for turbo-molecular pump and the vacuum gage, according to the RS-232 hardware standard. As software, after careful evaluation of several options, we chose to develop a hybrid software packing using two different software development tools: LabVIEW, and assembly language. We chose LabVIEW because it is dedicated to data acquisition and communications, containing libraries for data collection, analysis, display and storage. (authors)

  10. SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K

    Energy Technology Data Exchange (ETDEWEB)

    Degraff, Brian D. [ORNL; Howell, Matthew P. [ORNL; Kim, Sang-Ho [ORNL; Neustadt, Thomas S. [ORNL

    2017-07-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has built and commissioned an independent Cryogenic Test Facility (CTF) in support of testing in the Radio-frequency Test Facility (RFTF). Superconducting Radio-frequency Cavity (SRF) testing was initially conducted with the CTF cold box at 4.5 K. A Kinney vacuum pump skid consisting of a roots blower with a liquid ring backing pump was recently added to the CTF system to provide testing capabilities at 2 K. System design, pump refurbishment and installation of the Kinney pump will be presented. During the commissioning and initial testing period with the Kinney pump, several barriers to achieve reliable operation were experienced. Details of these lessons learned and improvements to skid operations will be presented. Pump capacity data will also be presented.

  11. SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K

    Science.gov (United States)

    DeGraff, B.; Howell, M.; Kim, S.; Neustadt, T.

    2017-12-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has built and commissioned an independent Cryogenic Test Facility (CTF) in support of testing in the Radio-frequency Test Facility (RFTF). Superconducting Radio-frequency Cavity (SRF) testing was initially conducted with the CTF cold box at 4.5 K. A Kinney vacuum pump skid consisting of a roots blower with a liquid ring backing pump was recently added to the CTF system to provide testing capabilities at 2 K. System design, pump refurbishment and installation of the Kinney pump will be presented. During the commissioning and initial testing period with the Kinney pump, several barriers to achieve reliable operation were experienced. Details of these lessons learned and improvements to skid operations will be presented. Pump capacity data will also be presented.

  12. The vacuum interlock system for the CELSIUS ring

    International Nuclear Information System (INIS)

    Gajewski, K.

    1990-01-01

    A vacuum interlock system has been designed and built for the CELSIUS storage ring. The ultrahigh-vacuum system of CELSIUS has a design pressure of 10 -11 mbar. This is achieved by using vacuum-fired stainless-steel chambers, baking the whole ring to 300degC and running some 50 sputter ion and titanium sublimation pumps. The turbopumps, combined with roughing pumps, are used during the pump-down and the bake-out. The pressure is monitored by Penning vacuum gauges. There is a number of programmable pressure thresholds set to trigger various events (like closing the sector valves, disabling the bake-out, etc.). The interlock system is based on the Mitsubishi programmable logic controller (PLC). An IBM PC is used as an operator's console. The operation and performance of the system is described. On the basis of present experience an upgrading of the system is suggested. (orig.)

  13. ISR vacuum system

    CERN Multimedia

    CERN PhotoLab

    1971-01-01

    Some of the most important components of the vacuum system are shown. At the left, the rectangular box is a sputter-ion pump inside its bake-out oven. The assembly in the centre includes a sector valve, three roughing valves, a turbomolecular pump, a rotary backing pump and auxiliary equipment. At the right, the small elbow houses a Bayard-

  14. Refurbishing tritium contaminated ion sources

    International Nuclear Information System (INIS)

    Wright, K.E.; Carnevale, R.H.; McCormack, B.E.; Stevenson, T.; Halle, A. von

    1995-01-01

    Extended tritium experimentation on TFTR has necessitated refurbishing Neutral Beam Long Pulse Ion Sources (LPIS) which developed operational difficulties, both in the TFTR Test Cell and later, in the NB Source Refurbishment Shop. Shipping contaminated sources off-site for repair was not permissible from a transport and safety perspective. Therefore, the NB source repair facility was upgraded by relocating fixtures, tooling, test apparatus, and three-axis coordinate measuring equipment; purchasing and fabricating fume hoods; installing exhaust vents; and providing a controlled negative pressure environment in the source degreaser/decon area. Appropriate air flow monitors, pressure indicators, tritium detectors and safety alarms were also included. The effectiveness of various decontamination methods was explored while the activation was monitored. Procedures and methods were developed to permit complete disassembly and rebuild of an ion source while continuously exhausting the internal volume to the TFTR Stack to avoid concentrations of tritium from outgassing and minimize personnel exposure. This paper presents upgrades made to the LPIS repair facility, various repair tasks performed, and discusses the effectiveness of the decontamination processes utilized

  15. Bake-Out Mobile Controls for Large Vacuum Systems

    CERN Document Server

    Blanchard, S; Gomes, P; Pereira, H; Kopylov, L; Merker, S; Mikheev, M

    2014-01-01

    Large vacuum systems at CERN (Large Hadron Collider - LHC, Low Energy Ion Rings - LEIR...) require bake-out to achieve ultra-high vacuum specifications. The bake-out cycle is used to decrease the outgassing rate of the vacuum vessel and to activate the Non-Evaporable Getter (NEG) thin film. Bake-out control is a Proportional-Integral-Derivative (PID) regulation with complex recipes, interlocks and troubleshooting management and remote control. It is based on mobile Programmable Logic Controller (PLC) cabinets, fieldbus network and Supervisory Control and Data Acquisition (SCADA) application. The CERN vacuum installations include more than 7 km of baked vessels; using mobile cabinets reduces considerably the cost of the control system. The cabinets are installed close to the vacuum vessels during the time of the bake-out cycle. Mobile cabinets can be used in any of the CERN vacuum facilities. Remote control is provided through a fieldbus network and a SCADA application

  16. Development of a large lithium coolant system for operation under vacuum

    International Nuclear Information System (INIS)

    Kolowith, R.; Schwartz, K.E.; Meadows, G.E.; Berg, J.D.

    1983-11-01

    Argon and vacuum systems for the Experimental Lithium System (ELS) were tested to demonstrate vacuum-break capability, vacuum pumping performance, and vacuum sensor compatibility with a hostile liquid metal vapor/aerosol environment. Mechanical, diffusion and cryogenic vacuum pumps were evaluated. High-vacuum levels in the 10 -3 Pa range were achieved over a 270 0 C flowing lithium system. Ionization, thermal conductivity, capacitance manometer, and compound-type pressure sensors were evaluated to determine the effects of this potentially deleterious environment. Screening elbows were evaluated as pressure sensor protective devices. A dual-purpose vacuum-level/nitrogen partial-pressure sensor was evaluated as a means of detecting air in-leakage. Several types of static mechanical vacuum seals were also evaluated. Measurements of the vapor/aerosol generation were made at several system locations and operating conditions

  17. The vacuum interlock system for the PETRA III beamlines

    Energy Technology Data Exchange (ETDEWEB)

    Degenhardt, Markus; Hahn, Ulrich; Hesse, Mathias; Schulte-Schrepping, Horst [Deutsches Elektronen-Synchrotron (DESY), Hamburg (Germany)

    2008-07-01

    The storage ring PETRA at DESY in Hamburg is being reconstructed into the third generation source for synchrotron radiation, PETRA III. The up to 100 m long beamlines are large UHV-systems that guide the synchrotron radiation from the storage ring to the experiments. Each beamline will be equipped with a vacuum interlock system to ensure the safe operation of the vacuum components. In particular the task of the vacuum interlock is to prevent faulty operations that can cause a ventilation of the vacuum system or a damage of vacuum components by the high power synchrotron radiation beam. The interlock system will be implemented as a PLC that is connected to a distributed input/output layer via a field bus system. As a specialty, the PLC will be realised as a soft-PLC running on a PC with a real time windows operating system. Another specialty is the visualisation and remote control of the vacuum interlock system by means of a website. At the beamline the interlock will be operated via a touch panel that displays the visualisation website. Additionally, the interlock can be remotely operated from any location by opening the visualisation website with a browser. The interlock is protected against unauthorised operation by a login page. All relevant interlock data will be fed into the existing network-based archive system.

  18. Experience feedback on the refurbishment of the LECA hot laboratory at Cadarache

    International Nuclear Information System (INIS)

    Grandjean, Jean-Paul; Autran, Bernard; Blanc, Jean-Yves

    2007-01-01

    Full text: After ten years of renovation work, the LECA hot laboratory refurbishment project has finally been completed which means it is now time to draw a few conclusions. Refurbishment of LECA was needed to enable PIE in this laboratory up to 2015. Improvements were made according to the laboratory safety assessment in March 2001. More than 400,000 working hours were clocked up without any serious accidents. The overall radiological record remained below 0.4 man.Sv for this period despite a high contamination level in the venting system and hot cells. The total fissile mass was decreased by a factor of three, and contamination was also considerably reduced. The project was finalised two years later than expected, mainly due to difficulties with two contracts on civil engineering work to improve seismic resistance and on inserting stainless steel casing into some hot cells. Renovation work on existing structures was underestimated, as was the time required to re-commission the cells. The fact that the total number of external staff working inside the facility at the same time was limited also slowed work down. This delay affected the research programmes mainly over the last two years. On the whole, 85 % of all experimentation activities were nevertheless continued during refurbishment. New steps for refurbishment have already been planned so as to extend the LECA service life once again. A line of lead-shielded cells - not designed to withstand current earthquake standards - will be demolished before the end of 2008, and civil engineering operations have been programmed for 2013-2014 so the facility will be able to withstand a maximum design earthquake. (authors)

  19. Continuous vacuum processing system for quartz crystal resonators

    International Nuclear Information System (INIS)

    Ney, R.J.; Hafner, E.

    1979-01-01

    An ultrahigh vacuum continuous cycle quartz crystal fabrication facility has been developed that assures an essentially contamination-free environment throughout the final manufacturing steps of the crystal unit. The system consists of five essentially tubular vacuum chambers that are interconnected through gate valves. The unplated crystal resonators, mounted in ceramic flatback frames and loaded on carrier trays, enter the vacuum system through an entrance air lock, are UV/ozone cleaned, baked at 300 0 C, plated to frequency, thermocompression sealed, and exit as completed crystal units through an exit air lock, while the bake, plate and seal chambers remain under continuous vacuum permanently. In-line conveyor belts are used, in conjunction with balanced vacuum manipulators, to move the resonator components to the various work stations. Unique high density, highly directional nozzle beam evaporation sources, capable of long term operation without reloading, are used for electroding the resonators simultaneously on both sides. The design goal for the system is a production rate of 200 units per 8 hour day; it is adaptable to automatic operation

  20. Development of an improved low profile hub seal refurbishment tool

    International Nuclear Information System (INIS)

    Wagg, L.

    1997-01-01

    The hub seal area of a fuel channel feeder coupling can be exposed to oxygen in the atmosphere if protective measures are not taken during maintenance outages. Exposure to oxygen can lead to pitting of the hub seal area. Although this is a rare occurrence, the resulting possibility of the feeder coupling leakage led to the development of a feeder hub refurbishment tool. To reduce time and man-rem exposure during feeder hub seal refurbishment, an improved low profile hub seat refurbishing tool has been developed. The improved tool design will allow for quick and controlled removal of material, and the restoration of a roll-burnished finish equivalent to the original requirements. The new tool can be used in maintenance operations, with the end fitting present, as well as under retube-type circumstances, with the end fitting removed. (author)

  1. Space Telescope maintenance and refurbishment

    Science.gov (United States)

    Trucks, H. F.

    1983-01-01

    The Space Telescope (ST) represents a new concept regarding spaceborne astronomical observatories. Maintenance crews will be brought to the orbital worksite to make repairs and replace scientific instruments. For major overhauls the telescope can be temporarily returned to earth with the aid of the Shuttle. It will, thus, be possible to conduct astronomical studies with the ST for two decades or more. The five first-generation scientific instruments used with the ST include a wide field/planetary camera, a faint object camera, a faint object spectrograph, a high resolution spectrograph, and a high speed photometer. Attention is given to the optical telescope assembly, the support systems module, aspects of mission and science operations, unscheduled maintenance, contingency orbital maintenance, planned on-orbit maintenance, ground maintenance, ground refurbishment, and ground logistics.

  2. Internal motion in high vacuum systems

    Science.gov (United States)

    Frank, J. M.

    Three transfer and positioning mechanisms have been developed for the non-air exposed, multistep processing of components in vacuum chambers. The functions to be performed in all of the systems include ultraviolet/ozone cleaning, vacuum baking, deposition of thin films, and thermocompression sealing of the enclosures. Precise positioning of the components is required during the evaporation and sealing processes. The three methods of transporting and positioning the components were developed to accommodate the design criteria and goals of each individual system. The design philosophy, goals, and operation of the three mechanisms are discussed.

  3. Decision-making process to shut down, refurbish/modify, or decommission research reactors

    International Nuclear Information System (INIS)

    Stover, R.L.; Murphie, W.E.

    1992-01-01

    Most US research reactors were built more than 20 years ago and some more than 40 years ago. Many have undergone refurbishments and modifications to update their safety systems and experimental capabilities. But changing safety bases, social concerns, and budget constraints have required research reactor operators to continually make decisions to shut down or refurbish/modify their facilities. These decisions involve potential replacement of reactor equipment that has reached its lifetime limits. Changes in philosophy and operation of the reactors are also factors to be considered. In this paper, each of the four factors involved in the decision-making process are discussed in detail. Then, several examples from DOE research reactors in the United States are discussed. Finally, some general conclusions are given to aid in the decision-making process

  4. The New Control System for the Vacuum of ISOLDE

    CERN Document Server

    Blanchard, S; Bernard, FB; Blanco, E; Gomes, P; Vestergard, H; Willeman, D

    2011-01-01

    The On-Line Isotope Mass Separator (ISOLDE) is a facility dedicated to the production of radioactive ion beams for nuclear and atomic physics. From ISOLDE vacuum sectors to the pressurized exhaust gas storage tanks there are up to five stages of pumping for a total of more than one hundred pumps including turbo-molecular, cryogenic, dry, membrane and oil pumps. The ISOLDE vacuum control system is critical; the volatile radioactive elements present in the exhaust gases and the high and ultra high vacuum pressure specifications require a complex control and interlock system. This paper describes the reengineering of the control system developed using the CERN UNICOS-CPC framework. An additional challenge has been the usage of the UNICOS-CPC in a vacuum domain for the first time. The process automation provides multiple operating modes (rough pumping, bake-out, high vacuum pumping, regeneration for cryo-pumped sectors, venting, etc). The control system is composed of local controllers driven by...

  5. Evaluation of CBA first string full cell vacuum system

    International Nuclear Information System (INIS)

    Foerster, C.L.; Briggs, J.; Christianson, C.; Stattel, P.

    1983-01-01

    The CBA (Colliding Beam Accelerator, formerly known as ISABELLE) Full Cell Magnet System consisting of six superconducting dipole magnets and two superconducting quadrupole magnets requires two separate vacuum systems. One, known as beam vacuum operates below 3 x 10 -11 Torr and the other, known as insulating vacuum, operates at less than 10 -7 Torr to isolate cryo circuits from atmosphere and from the uhv beam tubes. The uhv bore tube is isolated from the 4.0 0 K magnet by thirty-six (36) layers of superinsulation and insulating vacuum. Heat load measurements on the bore tube have been completed and found to agree with data obtained in smaller controlled experiments. Measurements of helium, accumulated on cryogenic pumped charcoal panels over many weeks, have verified sensitive helium mass spectrometer leak detection methods for vacuum integrity, providing sound design of the welded complex. The Full Cell was assembled and operated under conditions that would exist in the completed machine. Pressures below 2 x 10 -11 Torr beam vacuum requirement and below 2 x 10 -7 Torr insulating vacuum, were routinely achieved during all phases of the Full Cell operation and support systems testing

  6. Operating status of TARN vacuum system and future tasks

    International Nuclear Information System (INIS)

    Chida, Katsuhisa; Tsujikawa, Hiroshi; Mizobuchi, Akira

    1981-01-01

    TARN (Test Accumulation Ring for Numatron) was constructed for the purpose of obtaining the fundamental data for high energy heavy ion accelerator (Numatron) project, which accelerates heavy ions up to uranium to 1 GeV/nucleon. Its vacuum is required to be 1 x 10 - 10 Torr or less on beam. In February, 1972, only the vacuum system was temporarily assembled, and the vacuum of 2 x 10 - 11 Torr was realized by baking at 300 deg C alone. In July, 1972, the assembling of the vacuum chamber into magnets was completed, and several test experiments were performed using the H 2+ beam from the SF cyclotron. In this report, first, the outline of the vacuum system, and next, its operation are described. For the reason of the purpose of the ring, the vacuum system is required to be atmospheric pressure to attach beam monitors and other measuring instruments just before the machine time. Therefore, it is an important task to make the evacuation time as short as possible. As future tasks, the examination on the material and shape of the chamber, the investigation of pump system (appropriate combination of ion pump, titanium sublimation pump, cryo-pump, molecular pump, etc.), the study on the measuring and control systems (accurate measurement of total pressure and partial pressure and the feedback to the protecting system), the studies of problems on the vacuum wall surface (surface treatment prior to assembling the chamber into the ring and the methods and the effects of baking and electric discharge cleaning) are included. (Wakatsuki, Y.)

  7. Scout house in Koeniz - Refurbishment of the heating system; Pfadiheim Weiermatt, Sanierung Waermeversorgung - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Messerli, A. [Neuenschwander - Neutair AG, Berne (Switzerland); Jenni, H. [Heimverein Falkenstein, Koeniz (Switzerland)

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a project carried out in Koeniz, Switzerland. The report examines how the energy situation at the local scout house was improved. The work included the refurbishment of the heating system using solar collectors, intelligently controlled heat pumps, a photovoltaics installation and even solar-powered street lighting. The project, which received a substantial echo from the general public, is described. The scouts were directly involved in the project and, in part, in the construction work. This, according to the authors, enhanced the educational aspect of the project. The report presents details on the various installations and is illustrated with schematics and photos. Also, the results of monitoring and measurements made are presented.

  8. BIM-Based Timber Structures Refurbishment of the Immovable Heritage Listed Buildings

    Science.gov (United States)

    Henek, Vladan; Venkrbec, Václav

    2017-12-01

    The use of Building information model (BIM) design tools is no longer an exception, but a common issue. When designing new buildings or complex renovations using BIM, the benefits have already been repeatedly published. The essence of BIM is to create a multidimensional geometric model of a planned building electronically on a computer, supplemented with the necessary information in advance of the construction process. Refurbishment is a specific process that combines both - new structures and demolished structures, or structures that need to be dismantled, repaired, and then returned to the original position. Often it can be historically valuable part of the building. BIM-based repairs and refurbishments of the constructions, especially complicated repairs of the structures of roof trusses of immovable heritage listed buildings, have not yet been credibly presented. However, the use of BIM tools may be advantageous in this area, because user can quickly response to the necessary changes that may be needed during refurbishments, but also in connection with the quick assessment and cost estimation of any unexpected additional works. The paper deals with the use of BIM in the field of repairs and refurbishment of the buildings in general. The emphasis on monumentally protected elements was priority. Advantage of the proposal research is demonstrated on case study of the refurbishment of the immovable heritage listed truss roof. According to this study, this construction was realized in the Czech Republic. Case study consists of 3D modelled truss parts and the connected technological workflow base. The project work was carried out in one common model environment.

  9. EPIQR - a decision making tool for apartment building refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    Caccavelli, D. [Centre Scientifique et Technique du Batiment, Cedex (France); Balaras, C. [National Observatory of Athens, Athens (Greece); Bluyssen, P. [TNO Building and Construction Research, Delft (Netherlands); Flourentzou, F. [Ecole Polytechnique Federale de Lausanne, Lausanne (France); Jaggs, M. [Building Research Establishment, Watford (United Kingdom); Wetzel, C. [Fraunhofer-Institut fur Bauphysik, Holzkirchen (Germany); Wittchen, K. [Danish Building Reasearch Institute, Hoersholm (Denmark)

    1999-11-01

    In a large majority of European countries, the amount of the maintenance and refurbishment works represents nearly 50% of the total amount spent in the building sector. New requirements are being added to the necessity of maintaining or re-establishing the building stock`s usage value. They are linked to the determination to reduce energy consumption, pollutant emissions, work site wastes, to improve the Indoor Environment Quality and all the modern conveniences inside apartment. Aware of this matter, the European Community has launched a two-year European research project, entitled EPIQR (Energy Performance, Indoor Environmental Quality, Retrofit) involving seven research institutions in the frame of the JOULE III programme. The purpose is to give architects and contracting authorities a multimedia tool to enable them to simultaneously grasp the whole process of apartment building refurbishment or retrofit. It has a number of functions: Assess the building`s degradation state based on a technical diagnosis after a standardised and complete inspection of the building; Prepare work proposals. These take into account not only the renovation of the building but also the improvement of the energy performance and IEQ; Estimate the costs corresponding to these works. A data base, containing the costs of 800 refurbishment works, provides a fast estimate of the total amount of the works being considered; Estimate the evolution of the degradation of the components if none of the works were to be carried out, as well as the refurbishment costs which would result. This paper provides an overview of the EPIQR methodology and the final deliverables of the project. (au)

  10. PC driven integrated vacuum system

    International Nuclear Information System (INIS)

    Curuia, M.; Culcer, M.; Brandea, I.; Anghel, M.

    2001-01-01

    The paper presents a integrated vacuum system which was designed and manufactured in our institute. The main parts of this system are the power supply unit for turbo-melecular pumps and the vacuummeter. Both parts of the system are driven by means of a personal computer using a serial communication, according to the RS 232 hardware standard.(author)

  11. Exposure management in a hot-cell decontamination and refurbishment campaign

    International Nuclear Information System (INIS)

    Courtney, J.C.; Ferguson, K.R.; Chesnovar, D.L.; Huebner, M.F.

    1984-01-01

    We developed a minicomputer-based system to provide rapid access to personnel dosimetry data during a campaign to decontaminate and refurbish a hot-cell at the Hot Fuel Examination Facility (HFEF) Complex. This system allows project management to estimate doses for future tasks, assess the effectiveness of decontamination and personnel protection techniques, and balance exposures among members of various skill groups. As the campaign progresses, projected total exposures can be minimized by tradeoffs between estimated doses during decontamination and estimated dose savings during the refurbishment phase. The effectiveness of various dose-reduction procedures can be compared on the basis of data from a few cell entries before more extensive routine operations are scheduled. Because the radiation fields vary significantly with location in the cell, we find that measurements of whole-body, skin, and extremity doses are more valuable than dose-rate information. Penetrating and skin radiation doses to personnel can be compared to administrative guidelines. This helps us to select the most effective combination of protective clothing. For example, leaded gauntlets reduce the dose rate to the workers' hands, but their use can increase the time required for some in-cell tasks. Hence, use of gauntlets can lead to higher whole-body and skin doses. The program is written for the HFEF Complex Harris/6 minimainframe computer with a disk-monitor operating system

  12. Laser based refurbishment of steel mill components

    CSIR Research Space (South Africa)

    Kazadi, P

    2006-03-01

    Full Text Available Laser refurbishment capabilities were demonstrated and promising results were obtained for repair of distance sleeves, foot rolls, descaler cassette, idler rolls. Based on the cost projections and the results of the in-situ testing, components which...

  13. The effects of acoustical refurbishment of classrooms on teachers’ perceived noise exposure and noise-related health symptoms

    DEFF Research Database (Denmark)

    Kristiansen, Jesper; Lund, Søren Peter; Persson, Roger

    2015-01-01

    lessons with circa 2 dB(A) in both schools. Conclusion: The acoustical refurbishment was associated with a reduction in classroom reverberation time and activity sound levels in both schools. The acoustical refurbishment was associated with a reduction in the teachers’ perceived noise exposure...... of RT and activity sound levels were measured before and after refurbishment. Data on perceived noise exposure, disturbance attributed to different noise sources, voice symptoms, and fatigue after work were collected over a year in a total of six consecutive questionnaires. Results: Refurbished......, the mean classroom reverberation time was 0.68 (school A) and 0.57 (school B) and 0.55 s in sham refurbished classrooms. After refurbishment, the RT was approximately 0.4 s in both schools. Activity sound level measurements confirmed that the intervention had reduced the equivalent sound levels during...

  14. The influences of attributes, skills and knowledge of managers on refurbishment project performance

    Science.gov (United States)

    Ishak, Nurfadzillah

    2018-02-01

    Recently, the momentum on the growth of national building industry shows the increasing of the demand in refurbishment works becomes a trend spreading over the Malaysia. However, the potential of these activities normally related with the complexity in technical aspect compared to new build schemes. It will be reflecting on the unsatisfactory project performance. A competent manager is required to have the appropriate attributes, skills and knowledge in able to perform all the duties associated with managing the refurbishment building projects. Therefore, this paper is to identify the most appropriate attributes, skills and knowledge that required for managers to indicate the relationship between the influences on the refurbishment projects performance. This finding is indicate the importance of development the personal attributes, skills, and knowledge of managers and adds as benefit of raising the profile and image of managers in refurbishment building industry through a dissemination of the findings.

  15. In situ conditioning for proton storage ring vacuum systems

    International Nuclear Information System (INIS)

    Blechschmidt, D.

    1978-01-01

    Average pressure and vacuum-stability limit as expected in the presence of a proton beam were measured after in situ treatments such as bakeout under various conditions, argon glow-discharge cleaning and sputter deposition of titanium. Measurements were carried out for test pipes made of stainless steel (untreated, electropolished, or cooled to 77 K), pure titanium and aluminum alloy. The measurement method used to obtain the vacuum-stability limit in the laboratory and in a prototype system is described. The results can be applied also to other systems of different geometry by use of scaling laws. In situ conditioning generally has a stronger influence on vacuum performance than a particular choice of material. Bakeout gives low average pressures and rather good vacuum stability. Glow discharges also increase the vacuum stability but have only a small effect on the static pressure. Coating the beam-pipe wall with titanium by in situ sputtering provides large linear pumping, thus a lower pressure and an extremely good vacuum stability

  16. Sewerage force adjustment technology for energy conservation in vacuum sanitation systems

    Science.gov (United States)

    Guo, Zhonghua; Li, Xiaoning; Kagawa, Toshiharu

    2013-03-01

    The vacuum sanitation is the safe and sound disposal approach of human excreta under the specific environments like flights, high speed trains and submarines. However, the propulsive force of current systems is not adjustable and the energy consumption does not adapt to the real time sewerage requirement. Therefore, it is important to study the sewerage force adjustment to improve the energy efficiency. This paper proposes an energy conservation design in vacuum sanitation systems with pneumatic ejector circuits. The sewerage force is controlled by changing the systematic vacuum degree according to the amount of the excreta. In particular, the amount of the excreta is tested by liquid level sensor and mass sensor. According to the amount of the excreta, the relationship between the excreta amount and the sewerage force is studied to provide proper propulsive force. In the other aspect, to provide variable vacuum degrees for different sanitation requirements, the suction and discharge system is designed with pneumatic vacuum ejector. On the basis of the static flow-rate characteristics and the vacuum generation model, the pressure response in the ejector circuit is studied by using the static flow rate characteristics of the ejector and air status equation. The relationship is obtained between supplied compressed air and systematic vacuum degree. When the compressed air is supplied to the ejector continuously, the systematic vacuum degree increases until the vacuum degree reaches the extreme value. Therefore, the variable systematic vacuum degree is obtained by controlling the compressed air supply of the ejector. To verify the effect of energy conservation, experiments are carried out in the artificial excreta collection, and the variable vacuum-degree design saves more than 30% of the energy supply. The energy conservation is realized effectively in the new vacuum sanitation systems with good application prospect. The proposed technology provides technological

  17. Development of a virtual training simulator for a challenging refurbishment task

    International Nuclear Information System (INIS)

    Mort, P.E.

    1996-01-01

    An overview is presented of the technology, developed by British Nuclear Fuels Limited (BNFL), to create a virtual training simulator for refurbishment tasks. It focuses on the Raffinate Project, a challenging plant modification take, performed remotely, during which component removal, welding and installation of new components are all undertaken. The Training Simulator developed required fast multiprocessor computing with system intercommunication. Operators responded well to the Training Simulator and further improvements to the system are underway. (UK)

  18. Life extension studies and refurbishing of C and I systems of Cirus

    International Nuclear Information System (INIS)

    Awale, P.K.; Sumanth, P.; Roy, Kallol; Bharadwaj, G.

    2005-01-01

    Effects of ageing and component obsolescence of C and I systems of Cirus has been studied, by classifying the C and I systems as (a) those which may affect the operating life of the plant and cannot be repaired/replaced without core-unloading and dismantling the reactor structure. (Group-A), (b) those components which can be repaired/replaced but with considerable difficulty (Group-B) and (c) those which do not affect plant operations and can be easily repaired or replaced (Group-C). Life extension studies included performance assessment, reliability centred evaluation, parametric deviations from base-line characteristics and identification of specific ageing phenomenon and examination of internals. Based on these studies a comprehensive ageing mitigation programme was evolved, necessitating suitable modifications, instrumentation upgradation and component repair/replacement. A major modification job has been to provide an alternate failed fuel detection (FFD) system, since the success rate of the present system, had been decreasing over the years. Further, taking advantage of the available refurbishing outage, a number of instruments and accessories, pertaining to Group-C, were also replaced with state-of-the-art, components. Consideration is also given to requirements of special reactor start-up instrumentation for sensing the initial low neutron count in presence of a high gamma background, during the ensuing reactor start-up with fresh fuel. (author)

  19. Refurbishment programme for the BR2-reactor

    Energy Technology Data Exchange (ETDEWEB)

    Koonen, E [Centre d' Etude de l' Energie Nucleaire, Studiecentrum voor Kernenergie, BR2 Department, Boeretang, Mol (Belgium)

    1992-07-01

    BR2 is a high flux engineering test reactor, which differs from comparable material testing reactors by its specific core array (fig. 1). It is a heterogeneous, thermal, tank-in-pool type reactor, moderated by beryllium and light water, which serves also as coolant. The fuel elements consist of cylindrical assemblies loaded in channels materialized by hexagonal beryllium prisms. The central 200 mm channel is vertical, while all others are inclined and form a hyperbolical arrangement around the central one. This feature combines a very compact core with the requirement of sufficient space for individual access to all channels through penetrations in the top cover of the aluminium pressure vessel. Each channel may hold a fuel element, a control rod, an experiment, an irradiation device or a beryllium plug. The refurbishment Program According to the present programme of C.E.N./S.C.K., BR2 will be in operation until 1996. At that time, the beryllium matrix will reach its foreseen end-of-life. In order to continue operation beyond this point, a thorough refurbishment of the reactor is foreseen, in addition to the unavoidable replacement of the matrix, to ensure quality of the installation and compliance with modern standards. Some fundamental options have been taken as a starting point: BR2 will continue to be used as a classical MTR, i.e. fuel and material irradiations and safety experiments with some additional service-activities. The present configuration is optimized for that use and there is no specific experimental requirement to change the basic concepts and performance characteristics. From the customers viewpoint, it is desirable to go ahead with the well-known features of BR2, to maintain a high degree of availability and reliability and to minimize the duration of the long shutdown. It is also important to limit the amount of nuclear liabilities. So the objective of the refurbishment programme is the life extension of BR2 for about 15 years, corresponding to

  20. Refurbishment programme for the BR2-reactor

    International Nuclear Information System (INIS)

    Koonen, E.

    1992-01-01

    BR2 is a high flux engineering test reactor, which differs from comparable material testing reactors by its specific core array (fig. 1). It is a heterogeneous, thermal, tank-in-pool type reactor, moderated by beryllium and light water, which serves also as coolant. The fuel elements consist of cylindrical assemblies loaded in channels materialized by hexagonal beryllium prisms. The central 200 mm channel is vertical, while all others are inclined and form a hyperbolical arrangement around the central one. This feature combines a very compact core with the requirement of sufficient space for individual access to all channels through penetrations in the top cover of the aluminium pressure vessel. Each channel may hold a fuel element, a control rod, an experiment, an irradiation device or a beryllium plug. The refurbishment Program According to the present programme of C.E.N./S.C.K., BR2 will be in operation until 1996. At that time, the beryllium matrix will reach its foreseen end-of-life. In order to continue operation beyond this point, a thorough refurbishment of the reactor is foreseen, in addition to the unavoidable replacement of the matrix, to ensure quality of the installation and compliance with modern standards. Some fundamental options have been taken as a starting point: BR2 will continue to be used as a classical MTR, i.e. fuel and material irradiations and safety experiments with some additional service-activities. The present configuration is optimized for that use and there is no specific experimental requirement to change the basic concepts and performance characteristics. From the customers viewpoint, it is desirable to go ahead with the well-known features of BR2, to maintain a high degree of availability and reliability and to minimize the duration of the long shutdown. It is also important to limit the amount of nuclear liabilities. So the objective of the refurbishment programme is the life extension of BR2 for about 15 years, corresponding to

  1. Vacuum system design considerations of the Los Alamos Accelerator Test Stand (ATS)

    International Nuclear Information System (INIS)

    Wilson, N.G.

    1986-01-01

    The accelerator test stand (ATS), in operation at the Los Alamos National Laboratory, includes a hydrogen ion source, low- and high-energy beam-transport sections, and a 425-MHz radio-frequency quadrupole (RFQ) linear accelerator. A 425-MHz drift-tube linac (DTL) and a powered ''buncher'' matching section have been constructed and will be installed on the ATS. The vacuum systems required for the various sections of the ATS are designed to provide: (1) high gas-load capability, as required in the ion source, and (2) high-vacuum capability in the high-power, radio-frequency accelerator sections (where fast vacuum-system response time is of importance) through the use of distributed, differential pumping as a principal vacuum-system feature. This paper describes properties of accelerator materials, vacuum-systems engineering and analysis, vacuum equipment used, and ATS vacuum-system performance

  2. Refurbishing the BR2 materials testing reactor

    International Nuclear Information System (INIS)

    Baugnet, J.M.; Dekeyser, J.; Gubel, P.

    1995-01-01

    SCK/CEN is refurbishing its BR2 reactor to allow its further operation during the next 15 years; in doing so, it chooses to keep BR2 available for future scientific and technological irradiation programs within an international context. (author) 2 figs

  3. Foundation helps refurbish buildings

    International Nuclear Information System (INIS)

    Camenzind, B.

    2006-01-01

    This article looks at the activities of the Swiss 'Climate-Cent' foundation, which is helping support the energetic refurbishment of building envelopes. The conditions which have to be fulfilled to receive grants are explained. Work supported includes the replacement of windows and the insulation of roofs and attics as well as outside walls. Details on the financial support provided and examples of projects supported are given. The source of the finance needed to provide such support - a voluntary levy on petrol - and further support provided in certain Swiss cantons is commented on

  4. Vacuum system and cleaning techniques in the FTU machines

    International Nuclear Information System (INIS)

    Alessandrini, C.; Apicella, M.L.; Ferro, C.

    1988-01-01

    FTU (Frascati Tokamak Upgrade) is a high magnetic field (8T) tokamak under construction at the Frascati Energy Research Center (ENEA). Its vacuum systems has been already manifactured and is presently being assembled. It consist of an all metallic fully welded vessel, pumped by six turbomolecular pumps. The vacuum system has been dimensioned to allow a base pressure lower than 2.6 x 10 -6 Pa. The paper reports the design philosophy of the vacuum system. The results of the cleaning techniques performed on a 1:1 scale toroidal sector of FTU are also presented and discussed

  5. Rotor pole refurbishment for hydrogenerators: insulation problems and solutions

    International Nuclear Information System (INIS)

    Reynolds, R.R.; Rux, L.

    2005-01-01

    Rotor poles for Unit 1 at Lower Granite Powerhouse were removed from the rotor and shipped to a repair facility for refurbishment. Upon inspection, it was found that all of the pole bodies exhibited a distinct bow, center to end, on the pole mounting surface. In some cases, the deflection was as much as 0.106 inch. Concerns were raised about how this condition might affect the ability to properly insulate and/or re-seat the poles. This paper presents details of the rotor pole and field winding evaluation, the problems encountered, and the solutions implemented to successfully refurbish the rotor poles and field winding. (author)

  6. Experience with the TRIUMF Main Tank Vacuum Control System

    International Nuclear Information System (INIS)

    Sarkar, S.; Yandon, J.C.; Sievers, W.; Bennett, P.; Gurd, D.P.; Harmer, P.; Nelson, J.

    1993-01-01

    The TRIUMF Main Tank Vacuum Control System was upgraded in 1984. The earlier system, which consisted of a collection of hardwired relay logic boxes housed in three standard instrumentation racks, was replaced with a compact and flexible microprocessor-based control system. The user interface, previously distributed over the three racks, was consolidated into a single hardwired control and mimic panel. Since 1984, the Main Tank Vacuum System has undergone a series of changes in configuration and vacuum pumping hardware with necessary changes being implemented in the control system logic. Corresponding changes to the user interface were sometimes difficult to implement and in time exhausted the spare input/output capacity which had been built into the panel. The availability of inexpensive personal computers with adequate graphics capability and the ease of modifying, or adding to a programmable user interface precipitated the retirement of the hardwired panel and its replacement by a PC-based graphics user interface. System configuration, safety considerations, the hardware and the software implementation using the open-quote C close-quote programming language are described. The evolution of the control system and its performance, both over the years and in adapting to the vacuum system changes, are discussed

  7. LHC : The World's Largest Vacuum Systems being commissioned at CERN

    CERN Document Server

    Jiménez, J M

    2008-01-01

    When it switches on in 2008, the 26.7 km Large Hadron Collider (LHC) at CERN, will have the world's largest vacuum system operating over a wide range of pressures and employing an impressive array of vacuum technologies. This system is composed by 54 km of UHV vacuum for the circulating beams and 50 km of insulation vacuum around the cryogenic magnets and the liquid helium transfer lines. Over the 54 km of UHV beam vacuum, 48 km of this are at cryogenic temperature (1.9 K). The remaining 6 km of beam vacuum containing the insertions for "cleaning" the proton beams, radiofrequency cavities for accelerating the protons as well as beam-monitoring equipment is at ambient temperature and uses non-evaporable getter (NEG) coatings - a vacuum technology that was born and industrialized at CERN. The pumping scheme is completed using 780 ion pumps to remove noble gases and to provide pressure interlocks to the 303 vacuum safety valves. Pressure readings are provided by 170 Bayard-Alpert gauges and 1084 gauges (Pirani a...

  8. The impact of building orientation and discount rates on a Portuguese reference building refurbishment decision

    International Nuclear Information System (INIS)

    Brandão de Vasconcelos, Ana; Cabaço, António; Pinheiro, Manuel Duarte; Manso, Armando

    2016-01-01

    Refurbishment, as part of the construction industry, has a strong global impact, not only from the viewpoint of economies but also from social and energy-efficiency perspectives. A thermal refurbishment process, in particular, involves numerous decisions and choices; the decision-makers being ultimately confronted with two major questions: which criterion should be adopted in the choice of the refurbishment construction solutions and which refurbishment construction solutions should be chosen? In this paper, a criterion based on technical and economic points of view is proposed, aiming to identify the cost-optimal package of energy efficient solutions from among a set of possible refurbishment measures, within the life cycle of buildings. Sensitivity analyses are also performed so that the results may help the decision-maker choose the appropriate refurbishment solutions to be adopted when different discount rates and building orientations are taken into consideration. A total of seven scenarios, for a macroeconomic perspective, and nine, for a financial perspective, are performed. The costoptimal methodology adopted, following the Directive 2010/31/EU (2010) recommendations, is applied to a Portuguese reference building. The analysis carried out allows obtaining low global life cycle costs solutions and points towards nearly Zero Energy Building (nZEB) concept. The results are important for drawing national political instruments on buildings energy efficiency. - Highlights: •Building refurbishment decision based on technical and economic points of view. •35.000 Packages of thermal rehabilitation solutions considered. •Building orientation and discount rate impact on the cost-optimal package of solutions. •Portuguese reference building case base.

  9. Analysis of the cost for the refurbishment of small hydropower plants

    International Nuclear Information System (INIS)

    Ogayar, B.; Vidal, P.G.; Hernandez, J.C.

    2009-01-01

    In view of all the concerns associated with fossil fuels and energy demand it is appropriate to investigate the large number of abandoned small hydropower plants. In order to solve the difficulty implied, by a viability study on the refurbishment of a small hydropower plant, a series of simple equations has been developed based on the economic optimization of the different elements. These equations can also be used for completely new hydropower plants. The result of this study will allow us to obtain quite approximate costs for the refurbishment of old hydropower plants, or the construction of new ones. These data on costs will act as a reference to examine real possibilities of refurbishment through different tools of financial and economic analysis. Although the equations developed have used unitary prices referring to Spain, they will be applicable to other countries just changing those prices for those of the country, required. (author)

  10. Refurbishment of the Oregon State University rotating rack

    International Nuclear Information System (INIS)

    Higginbotham, J.F.

    1991-01-01

    TRIGA reactors have experienced operational difficulties with the rotating racks used for sample irradiation. The most common problem occurs when the rack seizes, and the corrective action taken is replacement of the rack assembly. This paper describes the symptoms leading to rack failure and a refurbishment procedure to correct the problem without replacing the rack at the Oregon State University TRIGA Reactor (OSTR) Facility. This procedure was accomplished with extraordinary results from an operational and a radiation protection standpoint. The refurbishment has extended the useful life of this reactor facility with minimal financial impact. Given the declining number of university-based research reactors, it is in the nation's best interest to maintain the currently operating research reactor facilities, and the described procedure can aid in achieving that goal

  11. Study on identification method of auto refurbishment test

    Science.gov (United States)

    Jiang, Zhenfei; Feng, Qingfu; Wang, Zhengyu; Jiang, Suqin; Chen, Xing; Zheng, Shaoyuan; Li, Bokui

    2018-04-01

    In recent years, a large number of refurbished cars inflow into the market as new cars. The traditional methods to identify refurbished cars are mostly based on experience, the subjectivity is too high and the credibility is low. In the production of automobile, the state and the automobile industry set clear standards for the thickness of the automobile paint. There is a big difference between the thickness of machine spraying and manual spraying. By studying this difference and combining with the standard, it can be identified accurately whether the car has been renovated; during the second assembly process, the surface of some parts (such as bolts) will have obvious signs of wear and tear due to the regular assembly and disassembly, it can also be identified accurately through the study of these assembly traces.

  12. The vacuum system of the Karlsruhe magnetic spectrograph 'Little John'

    International Nuclear Information System (INIS)

    Buschmann, J.; Gils, H.J.; Jelitto, H.; Krisch, J.; Ludwig, G.; Manger, D.; Rebel, H.; Seith, W.; Zagromski, S.

    1985-02-01

    The vacuum equipment of the magnetic spectrograph Little John is described. The system is characterized by the following special features: The sliding exit flange of the target chamber can be moved to the desired angle of observation without affecting the high vacuum. The pressure maintained is less by a factor of ten than the pressure in the incoming beam tubing. The vacuum system is divided into several separate pumping sections. Ground loops are strictly avoided. All actual states of relevance are fed back to the control panels. The vacuum installation is protected by hardware interlocking systems as well as by a real time program written in FORTRAN in cooperation with CAMAC interfacing. (orig.) [de

  13. 242-A evaporator vacuum condenser system

    International Nuclear Information System (INIS)

    Smith, V.A.

    1994-01-01

    This document is written for the 242-A evaporator vacuum condenser system (VCS), describing its purpose and operation within the evaporator. The document establishes the operating parameters specifying pressure, temperature, flow rates, interlock safety features and interfacing sub-systems to support its operation

  14. Refurbishment and optimisation of the district heating system and the Morettina central heating station in Locarno, Switzerland; Sanierung und Optimierung des Waermeverbundes und der Heizzentrale Morettina in Locarno. Erfolgskontrolle der Betriebsoptimierung

    Energy Technology Data Exchange (ETDEWEB)

    Lanz, S. [Dr. Eicher und Pauli AG, Berne (Switzerland); Ceschi, P. A. [Calore SA, c/o S.E.S., Locarno (Switzerland)

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) discusses the successful operational optimisation of a district heating system in Locarno in southern Switzerland. The system supplies various public and private buildings with heat and cold. This pilot installation features boilers fired with liquefied gas, a combined heat and power unit and a combined heat-pump/refrigeration system. The refurbishment of the installations after three years of operation is described, which included changes to the system's hydraulics and control system as well as improvements to various sub-stations in the heating network. The results of the refurbishment, including better co-ordination of the various aggregates and lower operating temperatures, are discussed. Recommendations are also made on the planning, organisation and operation of future projects of this type.

  15. Vacuum pumping system for the JT-60 radio-frequency heating system

    International Nuclear Information System (INIS)

    Yokokura, Kenji; Ikeda, Yoshitaka; Imai, Tuyoshi; Suganuma, Kazuaki; Nagashima, Takashi

    1988-01-01

    The basic design requirements set up for the JT-60 radio-frequency heating system included: (1) rapid pumping of gas released upon application of a radio-frequency power to maintain the pressure in the launchers at 10 -2 - 10 -3 Pa or less, (2) incorporation of a gas analysis system that can operate under a strong field and high pressure (>10 -2 Pa) to permit remote controlled data collection and processing, and (3) low cost, multiple functions and high reliability. The vacuum pumping system, consisting of three units for low hybrid radio-frequency (LHRF) and one unit for ion cyclotron radio-frequency (ICRF), is connected to each launcher provided at the four ports of JT-60. The LHRF unit is composed of a main pump, an alumina joint for electrical insulation from the launcher, a metallic gate valve for isolation from the JT-60 vacuum region, and various vacuum gauges. Only a turbo-molecular pump is used for the ICRF system because a large-scale differential pumping is not required. A gas measuring system is incorporated which consists of a mass filter, personal computer, turbo-molecular pump, and variable flow valve equipped with an APG control. This system is designed to identify and make use of gas impurities released during the launcher aging process. The control system employed consists of a personal computer, interlock control board, data logger and other devices such as vacuum gages. (Nogami, K.)

  16. Venturi vacuum systems for hypobaric chamber operations.

    Science.gov (United States)

    Robinson, R; Swaby, G; Sutton, T; Fife, C; Powell, M; Butler, B D

    1997-11-01

    Physiological studies of the effects of high altitude on man often require the use of a hypobaric chamber to simulate the reduced ambient pressures. Typical "altitude" chambers in use today require complex mechanical vacuum systems to evacuate the chamber air, either directly or via reservoir system. Use of these pumps adds to the cost of both chamber procurement and maintenance, and service of these pumps requires trained support personnel and regular upkeep. In this report we describe use of venturi vacuum pumps to perform the function of mechanical vacuum pumps for human and experimental altitude chamber operations. Advantages of the venturi pumps include their relatively low procurement cost, small size and light weight, ease of installation and plumbing, lack of moving parts, and independence from electrical power sources, fossil fuels and lubricants. Conversion of three hyperbaric chambers to combined hyper/hypobaric use is described.

  17. Design of cryo-vacuum system for MW neutral beam injector

    International Nuclear Information System (INIS)

    Hu Chundong; Xie Yuanlai

    2010-01-01

    Neutral beam injector is an equipment that is used to produce and then to neutralize high energetic particle beam. A neutral beam injector (EAST-NBI) with MW magnitude neutral beam power is considered to be developed to support the EAST physical research. The requirements for vacuum system were analyzed after introducing the principle of EAST-NBI. A differential vacuum system structure was chosen after analyzing the performance of different vacuum pumping system structure. The gas sources and their characteristics were analyzed, and two inserted type cryocondensation pumps were chosen as main vacuum pump. The schematic structure of the two cryocondensation pump with pumping area 8 m 2 and 6 m 2 were given and their cooling method and temperature control mode were determined. (authors)

  18. Project Experiences in Research Reactor Ageing Management, Modernization and Refurbishment. Report of a Technical Meeting on Research Reactor Ageing Management, Modernization and Refurbishment

    International Nuclear Information System (INIS)

    2014-08-01

    Research reactors have played an important role in several scientific fields for around 60 years: in the development of nuclear science and technology; in the valuable generation of radioisotopes for various applications; and in the development of human resources and skills. Moreover, research reactors have been effectively utilized to support sustainable development in more than 60 countries worldwide. More than half of all operating research reactors are now over 40 years old, with many exceeding their originally conceived design life. The majority of operating research reactors face challenges due to the negative impacts of component and system ageing, which manifest in a number of forms. This situation was highlighted by a serious medical isotope supply crisis which peaked in mid-2010, when several major producing reactors underwent prolonged shutdowns due to extensive necessary overhauls of various systems. Several facilities have established a proactive systematic approach to managing ageing or mitigating its impact on safety and availability of isotopes. Others have tried to prevent or remedy the drawbacks of ageing on a case by case basis. Overall, a large body of knowledge related to ageing issues exists in many Member States. Collecting and sharing this information within the research reactor community can provide a solid foundation to develop a more systematic approach — that is, an ageing management programme to prevent negative consequences of ageing on the safety, and the operability and lifetime of operating, or even future, reactors. It may also help organizations to manage research reactors that have been in an extended shutdown state by ensuring that any required systems are operated and maintained in a safe manner prior to final decommissioning and disposal of fuel to safe storage facilities. Sharing experiences from projects undertaken to refurbish or replace equipment and systems, satisfy safety and regulatory requirements, improve

  19. Project Experiences in Research Reactor Ageing Management, Modernization and Refurbishment. Report of a Technical Meeting on Research Reactor Ageing Management, Modernization and Refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-08-15

    Research reactors have played an important role in several scientific fields for around 60 years: in the development of nuclear science and technology; in the valuable generation of radioisotopes for various applications; and in the development of human resources and skills. Moreover, research reactors have been effectively utilized to support sustainable development in more than 60 countries worldwide. More than half of all operating research reactors are now over 40 years old, with many exceeding their originally conceived design life. The majority of operating research reactors face challenges due to the negative impacts of component and system ageing, which manifest in a number of forms. This situation was highlighted by a serious medical isotope supply crisis which peaked in mid-2010, when several major producing reactors underwent prolonged shutdowns due to extensive necessary overhauls of various systems. Several facilities have established a proactive systematic approach to managing ageing or mitigating its impact on safety and availability of isotopes. Others have tried to prevent or remedy the drawbacks of ageing on a case by case basis. Overall, a large body of knowledge related to ageing issues exists in many Member States. Collecting and sharing this information within the research reactor community can provide a solid foundation to develop a more systematic approach — that is, an ageing management programme to prevent negative consequences of ageing on the safety, and the operability and lifetime of operating, or even future, reactors. It may also help organizations to manage research reactors that have been in an extended shutdown state by ensuring that any required systems are operated and maintained in a safe manner prior to final decommissioning and disposal of fuel to safe storage facilities. Sharing experiences from projects undertaken to refurbish or replace equipment and systems, satisfy safety and regulatory requirements, improve

  20. Ongoing refurbishment activities and strategy for the future operation of the BR2 reactor

    International Nuclear Information System (INIS)

    Koonen, E.; Gubel, P.

    1994-01-01

    The operation of the BR2 reactor with its second Be-matrix is foreseen up to mid-1995 or mid-1996. A life extension for another 15 years is envisaged considering programmatic, financial and technical aspects. At present, the second phase of the refurbishment programme is being executed. The major activities of this programme can be grouped under two headings: safety reassessment and ageing issues. The expected outcome end '93 is an assessment report defining extent, choosen options, prioritized activities, budget and a tentative planning for the preparation and execution of the refurbishment. These aspects together with the prospects of possible cooperation with other parties for the refurbishment programme and the future operation of BR2 will be evaluated by the CEN/SCK Board who has to take a decision early in 1994. Various scenarios are now being considered and evaluated for the refurbishment and the future BR2 operation regime. (author)

  1. Ongoing refurbishment activities and strategy for the future operation of the BR2 reactor

    Energy Technology Data Exchange (ETDEWEB)

    Koonen, E; Gubel, P [BR2 Department, Belgian Nuclear Research Center, CEN/SCK, Mol (Belgium)

    1993-07-01

    The operation of the BR2 reactor with its second Be-matrix is foreseen up to mid-1995 or mid-1996. A life extension for another 15 years is envisaged considering programmatic, financial and technical aspects. At present, the second phase of the refurbishment programme is being executed. The major activities of this programme can be grouped under two headings: safety reassessment and ageing issues. The expected outcome end '93 is an assessment report defining extent, choosen options, prioritized activities, budget and a tentative planning for the preparation and execution of the refurbishment. These aspects together with the prospects of possible cooperation with other parties for the refurbishment programme and the future operation of BR2 will be evaluated by the CEN/SCK Board who has to take a decision early in 1994. Various scenarios are now being considered and evaluated for the refurbishment and the future BR2 operation regime. (author)

  2. Ongoing refurbishment activities and strategy for the future operation of the BR2 reactor

    International Nuclear Information System (INIS)

    Koonen, E.; Gubel, P.

    1993-01-01

    The operation of the BR2 reactor with its second Be-matrix is foreseen up to mid-1995 or mid-1996. A life extension for another 15 years is envisaged considering programmatic, financial and technical aspects. At present, the second phase of the refurbishment programme is being executed. The major activities of this programme can be grouped under two headings: safety reassessment and ageing issues. The expected outcome end '93 is an assessment report defining extent, choosen options, prioritized activities, budget and a tentative planning for the preparation and execution of the refurbishment. These aspects together with the prospects of possible cooperation with other parties for the refurbishment programme and the future operation of BR2 will be evaluated by the CEN/SCK Board who has to take a decision early in 1994. Various scenarios are now being considered and evaluated for the refurbishment and the future BR2 operation regime. (author)

  3. Construction of vacuum system for Tristan accumulation ring

    International Nuclear Information System (INIS)

    Ishimaru, H.; Horikoshi, G.; Kobayashi, M.; Kubo, T.; Mizuno, H.; Momose, T.; Narushima, K.; Watanabe, H.; Yamaguchi, H.

    1983-01-01

    An all aluminum-alloy vacuum system for the TRISTAN accumulation ring is now under construction. Aluminum and aluminum alloys are preferred materials for ultrahigh vacuum systems of large electron storage rings because of their good thermal conductivity, extremely low outgassing rate, and low residual radioactivity. Vacuum beam chambers for the dipole and quadrupole magnets are extruded using porthole dies. The aluminum alloy 6063-T6 provides superior performance in extrusion. For ultrahigh vacuum performance, a special extrusion technique is applied which, along with the outgassing procedure used, is described in detail. Aluminum alloy 3004 seamless elliptical bellows are inserted between the dipole and quadrupole magnet chambers. These bellows are produced by the hydraulic forming of a seamless tube. The seamless bellows and the beam chambers are joined by fully automatic welding. The ceramic chambers for the kicker magnets, the fast bump magnets, and the slow beam intensity monitor are inserted in the aluminum alloy beam chambers. The ceramic chamber (98% alumina) and elliptical bellows are brazed with brazing sheets (4003-3003-4003) in a vacuum furnace. The brazing technique is described. The inner surface of the ceramic chamber is coated with a TiMo alloy by vacuum evaporation to permit a smooth flow of the RF wall current. Other suitable aluminum alloy components, including fittings, feedthroughs, gauges, optical windows, sputter ion pumps, turbomolecular pumps, and valves have been developed; their fabrication is described

  4. Evaluation of ISABELLE full cell ultra high vacuum system

    International Nuclear Information System (INIS)

    Foerster, C.L.; Briggs, J.; Chou, T.S.; Stattel, P.

    1980-01-01

    The ISABELLE Full Cell Vacuum System consisting of a 40 m long, by 8.8 cm diameter stainless steel tube pumped by seven pumping stations was assembled and processed for 10 -12 Torr operation. Evaluation and testing of the system and its sub-assemblies has been completed. Detail design of system components and the determination of the conditioning process was completed. The best procedure to rough pump, leak test, vacuum bake the system, condition pumps, degas gauges, turn on ion pumps and flash sublimation pumps was established. Pressures below 2 x 10 -11 Torr are now routinely achieved in normal operation of the Full Cell. This includes pump down after replacement of various components and pump down after back fill with moist unfiltered air. The techniques developed for the Full Cell will be used to build the ISABELLE Ultra High Vacuum System

  5. Proceedings of the international conference on vacuum science and technology and SRS vacuum systems. V.1: accelerators and SRS systems

    International Nuclear Information System (INIS)

    Venkatramani, N.; Sinha, A.K.

    1995-01-01

    An International Conference on Vacuum Science and Technology, INCOVAST-95 was held during January 30 - February 2, 1995 at the Centre for Advanced Technology (CAT), Indore under the aegis of the Indian Vacuum Society. Centre for Advanced Technology has a major programme of design and construction of a 450 MeV electron storage ring, synchrotron radiation source Indus-1 followed by the 1.25 GeV Indus-2. To match the activities at the centre, the present conference had ultrahigh vacuum for Synchrotron Radiation Sources (SRSs) as the main theme. Three major topics, namely accelerators and SRS systems, thin films and surfaces, vacuum components and applications were covered in detail. A short summary of the discussions is also included in the proceedings. Papers relevant to INIS are indexed separately

  6. Vacuum Acceptance Tests for the UHV Room Temperature Vacuum System of the LHC during LS1

    CERN Document Server

    Cattenoz, G; Bregliozzi, G; Calegari, D; Gallagher, J; Marraffa, A; Chiggiato, P

    2014-01-01

    During the CERN Large Hadron Collider (LHC) first long shut down (LS1), a large number of vacuum tests are carried out on consolidated or newly fabricated devices. In such a way, the vacuum compatibility is assessed before installation in the UHV system of the LHC. According to the equipment’s nature, the vacuum acceptance tests consist in functional checks, leak test, outgassing rate measurements, evaluation of contaminants by Residual Gas Analysis (RGA), pumping speed measurements and qualification of the H2 sticking probability of Non-Evaporable-Getter (NEG) coating. In this paper, the methods used for the tests and the acceptance criteria are described. A summary of the measured vacuum characteristics for the tested components is also given.

  7. Design and construction of Alborz tokamak vacuum vessel system

    International Nuclear Information System (INIS)

    Mardani, M.; Amrollahi, R.; Koohestani, S.

    2012-01-01

    Highlights: ► The Alborz tokamak is a D-shape cross section tokamak that is under construction in Amirkabir University of Technology. ► As one of the key components for the device, the vacuum vessel can provide ultra-high vacuum and clean environment for the plasma operation. ► A limiter is a solid surface which defines the edge of the plasma and designed to protect the wall from the plasma, localizes the plasma–surface interaction and localizes the particle recycling. ► Structural analyses were confirmed by FEM model for dead weight, vacuum pressure and plasma disruptions loads. - Abstract: The Alborz tokamak is a D-shape cross section tokamak that is under construction in Amirkabir University of Technology. At the heart of the tokamak is the vacuum vessel and limiter which collectively are referred to as the vacuum vessel system. As one of the key components for the device, the vacuum vessel can provide ultra-high vacuum and clean environment for the plasma operation. The VV systems need upper and lower vertical ports, horizontal ports and oblique ports for diagnostics, vacuum pumping, gas puffing, and maintenance accesses. A limiter is a solid surface which defines the edge of the plasma and designed to protect the wall from the plasma, localizes the plasma–surface interaction and localizes the particle recycling. Basic structure analyses were confirmed by FEM model for dead weight, vacuum pressure and plasma disruptions loads. Stresses at general part of the VV body are lower than the structure material allowable stress (117 MPa) and this analysis show that the maximum stresses occur near the gravity support, and is about 98 MPa.

  8. Making the home consume less - putting energy efficiency on the refurbishment agenda

    Energy Technology Data Exchange (ETDEWEB)

    Stiess, Immanuel; Deffner, Jutta (Inst. for Social-Ecological Research ISOE GmbH (Germany)). e-mail: stiess@isoe.de; Zundel, Stefan (Lausitz Univ. of Applied Sciences (Germany))

    2009-07-01

    Private home owners can reduce their energy use significantly and move towards a low carbon lifestyle by retrofitting their homes in an energy efficient standard. Despite high awareness for energy efficiency and rising energy prices, home owners only slowly take this opportunity to cut down their personal energy use and carbon emission significantly. In many cases, maintenance and repair activities only result in incremental improvements of energy efficiency. Thus, the dynamics of refurbishment seems to have a conservative bias. Against this background, we will present results from an empirical survey, focussing on home owners' maintenance and refurbishment decisions. Drawing on approaches from social-psychology, lifestyle analysis and evolutionary economics, we will explore the impact of attitudes, lifestyle orientations, cognitive frameworks and social resources on refurbishment decision especially on energy efficient ones and present a model integrating the most important driving factors.

  9. PEP-II vacuum system pressure profile modeling using EXCEL

    International Nuclear Information System (INIS)

    Nordby, M.; Perkins, C.

    1994-06-01

    A generic, adaptable Microsoft EXCEL program to simulate molecular flow in beam line vacuum systems is introduced. Modeling using finite-element approximation of the governing differential equation is discussed, as well as error estimation and program capabilities. The ease of use and flexibility of the spreadsheet-based program is demonstrated. PEP-II vacuum system models are reviewed and compared with analytical models

  10. Refurbishment of industrial buildings

    International Nuclear Information System (INIS)

    Gustafsson, Stig-Inge

    2006-01-01

    When a building is subject for refurbishment, there is a golden opportunity to change its behavior as an energy system. This paper shows the importance of careful investigations of the processes, the climate shield and the heating systems already present in the building before measures are implemented in reality. A case study is presented dealing with a carpentry factory. The building is poorly insulated according to standards today, and initially it was assumed that a better thermal shield would be of vital importance in order to reach optimal conditions. Instead, it is shown that the main problem is the ordinary heating system. This uses steam from a wood chips boiler and the wood chips come from the manufacturing processes. These wood chips are, therefore, a very cheap fuel. The boiler had, during decades of use, slowly degraded into a poor state. Hence, aero-tempers using expensive electricity have been installed to remedy the situation. These use not only expensive kWh but also very expensive kW due to the electricity tariff. It is shown that electricity for heating purposes must be abandoned and further, that this could be achieved at a surprisingly small cost. By stopping a large waste of steam, it was possible to find resources, in the form of unspent money, for further mending the existing heating system. Not only economy but also environmental hazards in the form of CO 2 emissions urges us to abandon electricity and instead use heat from cheap biomass fired boilers. Such equipment saves environment at the same time it saves money

  11. The probability safety assessment impact on the BR2 refurbishment

    International Nuclear Information System (INIS)

    Pouleur, Yvan

    1995-01-01

    The probabilistic safety assessment (PSA) study has proven its worth by establishing a sensitive safety screening of the reactor. It has focused engineering forces to technically improve safety systems and to measure the influence of functional modifications. In the future, the project will be developed in a living way, to reinforce the present structure along with continuous safety monitoring of the reactor and to develop engineers and operators safety skills. This paper presents the PSA impact on the BR2 (Belgian Reactor Two) refurbishment. (author)

  12. Cold Vacuum Drying Instrument Air System Design Description (SYS 12)

    Energy Technology Data Exchange (ETDEWEB)

    SHAPLEY, B.J.; TRAN, Y.S.

    2000-06-05

    This system design description (SDD) addresses the instrument air (IA) system of the spent nuclear fuel (SNF). This IA system provides instrument quality air to the Cold Vacuum Drying (CVD) Facility. The IA system is a general service system that supports the operation of the heating, ventilation, and air conditioning (HVAC) system, the process equipment skids, and process instruments in the CVD Facility. The following discussion is limited to the compressor, dryer, piping, and valving that provide the IA as shown in Drawings H-1-82222, Cold Vacuum Drying Facility Mechanical Utilities Compressed & Instrument Air P&ID, and H-1.82161, Cold Vacuum Drying Facility Process Equipment Skid P&ID MCO/Cusk Interface. Figure 1-1 shows the physical location of the 1A system in the CVD Facility.

  13. The JET vacuum interspace system

    International Nuclear Information System (INIS)

    Orchard, J.; Scales, S.

    1999-01-01

    In the past JET has suffered from a number of vacuum leaks on components such as bellows, windows and feedthroughs due, in part, to the adverse conditions, including high mechanical forces, which may prevail during plasma operation. Therefore before the recent Tritium experiments on JET it was deemed prudent to manufacture and install items with a secondary containment or interspace in order to minimise the effect of failure of the primary vacuum barrier on both the leak integrity of the machine and the outcome of the experiments. This paper describes the philosophy, logistics, method and implementation of an integrated connection and monitoring system on the 330 interspaces currently in position on the JET machine. Using the JET leak database comparisons are drawn of leak failure rates of the components allied to the number of operational hours, prior to the system being present and after installation and commissioning, and the case of detection compared to the previous situation. An argument is also presented on the feasibility and adaptability of this system to any large complex machine and the benefits to be obtained in reduction of leaks and operational down time. (author)

  14. Vacuum system for LHC

    International Nuclear Information System (INIS)

    Groebner, O.

    1995-01-01

    The Large Hadron Collider (LHC) which is planned at CERN will be housed in the tunnel of the Large Electron Positron collider (LEP) and will store two counter-rotating proton beams with energies of up to 7 TeV in a 27 km accelerator/storage ring with superconducting magnets. The vacuum system for the LHC will be at cryogenic temperatures (between 1.9 and 20 K) and will be exposed to synchrotron radiation emitted by the protons. A stringent limitation on the vacuum is given by the energy deposition in the superconducting coils of the magnets due to nuclear scattering of the protons on residual gas molecules because this may provoke a quench. This effect imposes an upper limit to a local region of increased gas density (e.g. a leak), while considerations of beam lifetime (100 h) will determine more stringent requirements on the average gas density. The proton beam creates ions from the residual gas which may strike the vacuum chamber with sufficient energy to lead to a pressure 'run-away' when the net ion induced desorption yield exceeds a stable limit. These dynamic pressure effects will be limited to an acceptable level by installing a perforated 'beam screen' which shields the cryopumped gas molecules at 1.9 K from synchrotron radiation and which also absorbs the synchrotron radiation power at a higher and, therefore, thermodynamically more efficient temperature. (author)

  15. Industry partnership: adding value to nuclear refurbishment and maintenance

    International Nuclear Information System (INIS)

    Gibbins, T.; Bains, N.; Morikawa, D.

    2008-01-01

    The Point Lepreau Generating Station was the first CANDU 6 unit to be licensed for operation, beginning commercial operation in 1983. It is now become the first CANDU 6 to undergo full refurbishment. As part of the overall project, all 380 fuel channels and associated feeders will be removed and replaced. In order to undertake this project, it was necessary for AECL to design and develop over fifty 'first-of-a-kind tools' for fuel channel and calandria tube replacement. This paper outlines the complexity of the retube tooling project and the industry partnership strategy for the engineered tooling systems development. (author)

  16. Comparison of occlusion break responses and vacuum rise times of phacoemulsification systems.

    Science.gov (United States)

    Sharif-Kashani, Pooria; Fanney, Douglas; Injev, Val

    2014-07-30

    Occlusion break surge during phacoemulsification cataract surgery can lead to potential surgical complications. The purpose of this study was to quantify occlusion break surge and vacuum rise time of current phacoemulsification systems used in cataract surgery. Occlusion break surge at vacuum pressures between 200 and 600 mmHg was assessed with the Infiniti® Vision System, the WhiteStar Signature® Phacoemulsification System, and the Centurion® Vision System using gravity-fed fluidics. Centurion Active FluidicsTM were also tested at multiple intraoperative pressure target settings. Vacuum rise time was evaluated for Infiniti, WhiteStar Signature, Centurion, and Stellaris® Vision Enhancement systems. Rise time to vacuum limits of 400 and 600 mmHg was assessed at flow rates of 30 and 60 cc/minute. Occlusion break surge was analyzed by 2-way analysis of variance. The Centurion system exhibited substantially less occlusion break surge than the other systems tested. Surge area with Centurion Active Fluidics was similar to gravity fluidics at an equivalent bottle height. At all Centurion Active Fluidics intraoperative pressure target settings tested, surge was smaller than with Infiniti and WhiteStar Signature. Infiniti had the fastest vacuum rise time and Stellaris had the slowest. No system tested reached the 600-mmHg vacuum limit. In this laboratory study, Centurion had the least occlusion break surge and similar vacuum rise times compared with the other systems tested. Reducing occlusion break surge may increase safety of phacoemulsification cataract surgery.

  17. TFCX pumped limiter and vacuum pumping system design and analysis

    International Nuclear Information System (INIS)

    Haines, J.R.

    1985-04-01

    Impurity control system design and performance studies were performed in support of the Tokamak Fusion Core Experiment (TFCX) pre-conceptual design. Efforts concentrated on pumped limiter and vacuum pumping system design configuration, thermal/mechanical and erosion lifetime performance of the limiter protective surface, and helium ash removal performance. The reference limiter design forms a continuous toroidal belt at the bottom of the device and features a flat surface with a single leading edge. The vacuum pumping system features large vacuum ducts (diameter approximately 1 m) and high-speed, compound cryopumps. Analysis results indicate that the limiter/vacuum pumping system design provides adequate helium ash removal. Erosion, primarily by disruption-induced vaporization and/or melting, limits the protective surface lifetime to about one calendar year or only about 60 full-power hours of operation. In addition to evaluating impurity control system performance for nominal TFCX conditions, these studies attempt to focus on the key plasma physics and engineering design issues that should be addressed in future research and development programs

  18. Apollo telescope mount thermal systems unit thermal vacuum test

    Science.gov (United States)

    Trucks, H. F.; Hueter, U.; Wise, J. H.; Bachtel, F. D.

    1971-01-01

    The Apollo Telescope Mount's thermal systems unit was utilized to conduct a full-scale thermal vacuum test to verify the thermal design and the analytical techniques used to develop the thermal mathematical models. Thermal vacuum test philosophy, test objectives configuration, test monitoring, environment simulation, vehicle test performance, and data correlation are discussed. Emphasis is placed on planning and execution of the thermal vacuum test with particular attention on problems encountered in conducting a test of this maguitude.

  19. Cold Vacuum Drying facility sanitary sewage collection system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) sanitary sewage collection system. The sanitary sewage collection system provides collection and storage of effluents and raw sewage from the CVDF to support the cold vacuum drying process. This system is comprised of a sanitary sewage holding tank and pipes for collection and transport of effluents to the sanitary sewage holding tank

  20. Vacuum system design and tritium inventory for the TFTR charge exchange diagnostic

    International Nuclear Information System (INIS)

    Medley, S.S.

    1979-05-01

    The charge exchange diagnostic for the TFTR is comprised of two analyzer systems which contain a total of twenty independent mass/energy analyzers and one diagnostic neutral beam tentatively rated at 80 keV, 15 A. The associated vacuum systems were analyzed using the Vacuum System Transient Simulator (VSTS) computer program which models the transient transport of multi-gas species through complex networks of ducts, valves, traps, vacuum pumps, and other related vacuum system components. In addition to providing improved design performance at reduced cost, the analysis yields estimates for the exchange of tritium from the torus to the diagnostic components and of the diagnostic working gases to the torus

  1. A remote joint system for large vacuum ducts

    International Nuclear Information System (INIS)

    Hagmann, D.B.; Coughlan, J.B.

    1983-01-01

    A large remote vacuum duct joining system has been developed for fusion machines that uses several two-jaw screwdriven clamps. The preferred location for clamp installation is inside the vacuum duct where access space is available for the actuating device. It also decreases space needed for handling operations exterior to the duct. The clamp system is unique in that it is low cost, applies force directly over the seal, permits leak testing to the seal annulus, is highly reliable, can be remotely replaced, and is usable on a variety of other applications

  2. An Integrated Refurbishment Design Process to Energy Efficiency

    NARCIS (Netherlands)

    Konstantinou, T.; Knaack, U.

    2013-01-01

    Given the very low renewal rate of the building stock, the efforts to reduce energy demand must focus on the existing residential buildings. Even though awareness has been raised, the effect on energy efficiency is often neglected during the design phase of refurbishment projects. This paper

  3. High-Rise Refurbishment: The Energy-Efficient Upgrade of Multi-Story Residences in the European Union

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    Some 36 million European households are in high-rise residences, one in six of all households, and yet many of the buildings are in urgent need of refurbishment. This study, which is one in a series being conducted on behalf of the International Energy Agency addressing the energy performance of the existing IEA-wide building stock, identifies a Europe-wide cost-effective energy saving potential of 28% from energy-efficient refurbishment of the high-rise residential building stock. Attainment of this potential would imply a 1.5% reduction of Europe's total final energy demand and annual CO2 emissions savings of 35 Mt. In practice only the less efficient buildings need to be refurbished to realise these stockaverage savings and for these buildings typical savings in heating energy from refurbishment of between 70 and 80% are identified. Buildings in general suffer from a variety of barriers that tend to prevent their occupants from maintaining and refurbishing them to levels of comfort and energy performance that would be justified over the longer term, but collective housing in general is particularly susceptible to market failures. Many occupants do not own the property while their landlords usually have little motivation to finance improvements. Refurbishment requires collective agreement on a capital investment, which is difficult to establish especially when some occupants expect to live in the building over the longer-term but others only for the short-term. Furthermore, in most cases the occupants of high-rise residences are not among the wealthier members of society and they find it difficult to raise capital for longer-term investments. It is not surprising, then, to find that this section of the building stock is the most neglected and that there remain significant cost-effective opportunities for it to be refurbished in a way that improves comfort, saves energy, reduces CO2 emissions and significantly improves the urban environment.

  4. Review of vacuum systems for x-ray lithography light sources

    International Nuclear Information System (INIS)

    Schuchman, J.C.

    1990-01-01

    This paper will review and give a status report on vacuum systems for X-Ray lithography light sources. It will include conventional machines and compact machines (machines using superconducting magnets). The vacuum systems will be described and compared with regard to basic machine parameters, pumping systems, types of pumps, chamber design and material, gauging and diagnostics, and machine performane. 23 refs., 8 figs., 1 tab

  5. Troubles in vacuum system and radiation exposure

    International Nuclear Information System (INIS)

    Konno, Osamu

    1978-01-01

    It is about eleven years since the LINAC of 300 MeV in Tohoku University has first accelerated electrons. The maintenance and improvement of the accelerator used more than 10 years now give the related personnel an important problem of radiation exposure. 40 days were required for the maintenance and checking-up in 1977, and other 26 days were used for other construction works. The troubles in the vacuum system occurred 81 times in total. The vacuum system is divided into two subsystems, each being provided with a leak detector. Either of them enables to detect and locate the leak. Silver-alloy brazing of a duct with a cooling water tube has deteriorated in the strength because of repeated baking temperature and/or the copper tubes for cooling have been eroded due to the large local cell action by purified water. The similar phenomena have occurred in RF windows, outside of which is cooled with water. Carbonaceous matter has stuck to the element of the ion pump, but successfully been cleaned. Though the energy compression system was installed for the efficient use of electrons, the troubles due to overheating of the current monitor have increased because of its limited space, and the change of location was made. Considerable surface residual radiation dose was found at some parts of transport system, and a few personnel have been exposed to radiation over 1000 mrem/year as a result of the troubles in vacuum system. (Wakatsuki, Y.)

  6. Project Plan Remote Target Fabrication Refurbishment Project

    International Nuclear Information System (INIS)

    Bell, Gary L.; Taylor, Robin D.

    2009-01-01

    was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

  7. Refurbishment of Railroad Crossties : A Technical and Economic Analysis

    Science.gov (United States)

    1977-12-01

    An analysis of the principal modes of failure for wooden railroad crossties was conducted and an evaluation of the technical and economic feasibility of refurbishing these ties was conducted. Among the principal modes of structural deterioration, onl...

  8. Vacuum Systems Consensus Guideline for Department of Energy Accelerator Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Casey,R.; Haas, E.; Hseuh, H-C.; Kane, S.; Lessard, E.; Sharma, S.; Collins, J.; Toter, W. F.; Olis, D. R.; Pushka, D. R.; Ladd, P.; Jobe, R. K.

    2008-09-09

    Vacuum vessels, including evacuated chambers and insulated jacketed dewars, can pose a potential hazard to equipment and personnel from collapse, rupture due to back-fill pressurization, or implosion due to vacuum window failure. It is therefore important to design and operate vacuum systems in accordance with applicable and sound engineering principles. 10 CFR 851 defines requirements for pressure systems that also apply to vacuum vessels subject to back-fill pressurization. Such vacuum vessels are potentially subject to the requirements of the American Society of Mechanical Engineers (ASME) Pressure Vessel Code Section VIII (hereafter referred to as the 'Code'). However, the scope of the Code excludes vessels with internal or external operating pressure that do not exceed 15 pounds per square inch gauge (psig). Therefore, the requirements of the Code do not apply to vacuum systems provided that adequate pressure relief assures that the maximum internal pressure within the vacuum vessel is limited to less than 15 psig from all credible pressure sources, including failure scenarios. Vacuum vessels that cannot be protected from pressurization exceeding 15 psig are subject to the requirements of the Code. 10 CFR 851, Appendix A, Part 4, Pressure Safety, Section C addresses vacuum system requirements for such cases as follows: (c) When national consensus codes are not applicable (because of pressure range, vessel geometry, use of special materials, etc.), contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local code. Measures must include the following: (1) Design drawings, sketches, and calculations must be reviewed and approved by a qualified independent design professional (i.e., professional engineer). Documented organizational peer review is acceptable. (2) Qualified personnel must be used to perform examinations

  9. Darlington refurbishment - performance improvement programs goals and experience

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, N. [Ontario Power Generation, Toronto, ON (Canada)

    2015-07-01

    This paper discusses the refurbishment program at the Darlington site. The program focuses on safety, integrity, excellence and personnel. Worker safety and public safety are of the highest priority. Success resulted from collaborative engineering interface, collaborative front end planning, highly competent people and respectful relationship with partners and regulators.

  10. Development of the vacuum system pressure responce analysis code PRAC

    International Nuclear Information System (INIS)

    Horie, Tomoyoshi; Kawasaki, Kouzou; Noshiroya, Shyoji; Koizumi, Jun-ichi.

    1985-03-01

    In this report, we show the method and numerical results of the vacuum system pressure responce analysis code. Since fusion apparatus is made up of many vacuum components, it is required to analyze pressure responce at any points of the system when vacuum system is designed or evaluated. For that purpose evaluating by theoretical solution is insufficient. Numerical analysis procedure such as finite difference method is usefull. In the PRAC code (Pressure Responce Analysis Code), pressure responce is obtained solving derivative equations which is obtained from the equilibrium relation of throughputs and contain the time derivative of pressure. As it considers both molecular and viscous flows, the coefficients of the equation depend on the pressure and the equations become non-linear. This non-linearity is treated as piece-wise linear within each time step. Verification of the code is performed for the simple problems. The agreement between numerical and theoretical solutions is good. To compare with the measured results, complicated model of gas puffing system is analyzed. The agreement is well for practical use. This code will be a useful analytical tool for designing and evaluating vacuum systems such as fusion apparatus. (author)

  11. Vacuum system for Advanced Test Accelerator

    International Nuclear Information System (INIS)

    Denhoy, B.S.

    1981-01-01

    The Advanced Test Accelerator (ATA) is a pulsed linear electron beam accelerator designed to study charged particle beam propagation. ATA is designed to produce a 10,000 amp 50 MeV, 70 ns electron beam. The electron beam acceleration is accomplished in ferrite loaded cells. Each cell is capable of maintaining a 70 ns 250 kV voltage pulse across a 1 inch gap. The electron beam is contained in a 5 inch diameter, 300 foot long tube. Cryopumps turbomolecular pumps, and mechanical pumps are used to maintain a base pressure of 2 x 10 -6 torr in the beam tube. The accelerator will be installed in an underground tunnel. Due to the radiation environment in the tunnel, the controlling and monitoring of the vacuum equipment, pressures and temperatures will be done from the control room through a computer interface. This paper describes the vacuum system design, the type of vacuum pumps specified, the reasons behind the selection of the pumps and the techniques used for computer interfacing

  12. Vacuum system for Advanced Test Accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Denhoy, B.S.

    1981-09-03

    The Advanced Test Accelerator (ATA) is a pulsed linear electron beam accelerator designed to study charged particle beam propagation. ATA is designed to produce a 10,000 amp 50 MeV, 70 ns electron beam. The electron beam acceleration is accomplished in ferrite loaded cells. Each cell is capable of maintaining a 70 ns 250 kV voltage pulse across a 1 inch gap. The electron beam is contained in a 5 inch diameter, 300 foot long tube. Cryopumps turbomolecular pumps, and mechanical pumps are used to maintain a base pressure of 2 x 10/sup -6/ torr in the beam tube. The accelerator will be installed in an underground tunnel. Due to the radiation environment in the tunnel, the controlling and monitoring of the vacuum equipment, pressures and temperatures will be done from the control room through a computer interface. This paper describes the vacuum system design, the type of vacuum pumps specified, the reasons behind the selection of the pumps and the techniques used for computer interfacing.

  13. New baking system for the RFX vacuum vessel

    Energy Technology Data Exchange (ETDEWEB)

    Collarin, P.; Luchetta, A.; Sonato, P.; Toigo, V.; Zaccaria, P.; Zollino, G. [Universita di Padova (Italy)

    1996-12-31

    A heating system based on eddy currents has been developed for the vacuum vessel of the RFX Reversed Field Pinch device. After a testing phase, carried out at low power, the final power supply system has been designed and installed. It has been used during last year to bake out the vessel and the graphite first wall up to 320{degree}C. Recently the heating system has been completed with a control system that allows for baking sessions with an automatic control of the vacuum vessel temperature and for pulse sessions with a heated first wall. After the description of the preliminary analyses and tests, and of the main characteristics of the power supply and control systems, the experimental results of the baking sessions performed during last year are presented. 6 refs., 7 figs.

  14. New baking system for the RFX vacuum vessel

    International Nuclear Information System (INIS)

    Collarin, P.; Luchetta, A.; Sonato, P.; Toigo, V.; Zaccaria, P.; Zollino, G.

    1996-01-01

    A heating system based on eddy currents has been developed for the vacuum vessel of the RFX Reversed Field Pinch device. After a testing phase, carried out at low power, the final power supply system has been designed and installed. It has been used during last year to bake out the vessel and the graphite first wall up to 320 degree C. Recently the heating system has been completed with a control system that allows for baking sessions with an automatic control of the vacuum vessel temperature and for pulse sessions with a heated first wall. After the description of the preliminary analyses and tests, and of the main characteristics of the power supply and control systems, the experimental results of the baking sessions performed during last year are presented. 6 refs., 7 figs

  15. Implementation of EPICS based vacuum control system for variable energy cyclotron centre, Kolkata

    Science.gov (United States)

    Roy, Anindya; Bhole, R. B.; Nandy, Partha P.; Yadav, R. C.; Pal, Sarbajit; Roy, Amitava

    2015-03-01

    The vacuum system of the Room Temperature (K = 130) Cyclotron of Variable Energy Cyclotron Centre is comprised of vacuum systems of main machine and Beam Transport System. The vacuum control system is upgraded to a PLC based Automated system from the initial relay based Manual system. The supervisory control of the vacuum system is implemented in Experimental Physics and Industrial Control System (EPICS). An EPICS embedded ARM based vacuum gauge controller is developed to mitigate the requirement of vendor specific gauge controller for gauges and also for seamless integration of the gauge controllers with the control system. A set of MS-Windows ActiveX components with embedded EPICS Channel Access interface are developed to build operator interfaces with less complex programming and to incorporate typical Windows feature, e.g., user authentication, file handling, better fonts, colors, mouse actions etc. into the operator interfaces. The control parameters, monitoring parameters, and system interlocks of the system are archived in MySQL based EPICS MySQL Archiver developed indigenously. In this paper, we describe the architecture, the implementation details, and the performance of the system.

  16. Implementation of EPICS based vacuum control system for variable energy cyclotron centre, Kolkata

    Energy Technology Data Exchange (ETDEWEB)

    Roy, Anindya, E-mail: r-ani@vecc.gov.in; Bhole, R. B.; Nandy, Partha P.; Yadav, R. C.; Pal, Sarbajit; Roy, Amitava [Variable Energy Cyclotron Centre, 1/AF Bidhan Nagar, Kolkata 700064 (India)

    2015-03-15

    The vacuum system of the Room Temperature (K = 130) Cyclotron of Variable Energy Cyclotron Centre is comprised of vacuum systems of main machine and Beam Transport System. The vacuum control system is upgraded to a PLC based Automated system from the initial relay based Manual system. The supervisory control of the vacuum system is implemented in Experimental Physics and Industrial Control System (EPICS). An EPICS embedded ARM based vacuum gauge controller is developed to mitigate the requirement of vendor specific gauge controller for gauges and also for seamless integration of the gauge controllers with the control system. A set of MS-Windows ActiveX components with embedded EPICS Channel Access interface are developed to build operator interfaces with less complex programming and to incorporate typical Windows feature, e.g., user authentication, file handling, better fonts, colors, mouse actions etc. into the operator interfaces. The control parameters, monitoring parameters, and system interlocks of the system are archived in MySQL based EPICS MySQL Archiver developed indigenously. In this paper, we describe the architecture, the implementation details, and the performance of the system.

  17. Implementation of EPICS based vacuum control system for variable energy cyclotron centre, Kolkata

    International Nuclear Information System (INIS)

    Roy, Anindya; Bhole, R. B.; Nandy, Partha P.; Yadav, R. C.; Pal, Sarbajit; Roy, Amitava

    2015-01-01

    The vacuum system of the Room Temperature (K = 130) Cyclotron of Variable Energy Cyclotron Centre is comprised of vacuum systems of main machine and Beam Transport System. The vacuum control system is upgraded to a PLC based Automated system from the initial relay based Manual system. The supervisory control of the vacuum system is implemented in Experimental Physics and Industrial Control System (EPICS). An EPICS embedded ARM based vacuum gauge controller is developed to mitigate the requirement of vendor specific gauge controller for gauges and also for seamless integration of the gauge controllers with the control system. A set of MS-Windows ActiveX components with embedded EPICS Channel Access interface are developed to build operator interfaces with less complex programming and to incorporate typical Windows feature, e.g., user authentication, file handling, better fonts, colors, mouse actions etc. into the operator interfaces. The control parameters, monitoring parameters, and system interlocks of the system are archived in MySQL based EPICS MySQL Archiver developed indigenously. In this paper, we describe the architecture, the implementation details, and the performance of the system

  18. A State of the Art Report on the Case Study of Hot Cell Decontamination and Refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    Won, H. J.; Jung, C. H.; Moon, J. K.; Park, G. I.; Song, K. C

    2008-08-15

    As the increase of the operation age of the domestic high radiation facilities such as IMEF, PIEF and DFDF, the necessity of decontamination and refurbishment of hot cells in these facilities is also increased. In the near future, the possibilities of refurbishment of hot cells in compliance with the new regulations, the reuse of hot cells for the other purposes and the decommissioning of the facilities also exist. To prepare against the decontamination and refurbishment of hot cells, the reports on the refurbishment, decommissioning and decontamination experiences of hot cells in USA, Japan, France, Belgium and Great Britain were investigated. ANL of USA performed the project on the decontamination of hot cells. The purpose of the project was to practically eliminate the radioactive emissions of Rn-220 to the environment and to restore the hot cells to an empty restricted use condition. The five hot cells were emptied and decontaminated for restricted use. Chemical processing facility in JAEA of Japan was used for the reprocessing study of spent fuels, hot cells in CPF were refurbished from 1995 for the tests of the newly developed reprocessing process. In a first stage, decommissioning and decontamination were fully performed by the remote operation Then, decommissioning and decontamination were performed manually. By the newly developed process, they reported that the radiation exposure of workers were satisfactorily reduced. In the other countries, they also make an effort for the refurbishment and decontamination of hot cells and it is inferred that they accumulate experiences in these fields.

  19. Systems and methods for analyzing liquids under vacuum

    Science.gov (United States)

    Yu, Xiao-Ying; Yang, Li; Cowin, James P.; Iedema, Martin J.; Zhu, Zihua

    2013-10-15

    Systems and methods for supporting a liquid against a vacuum pressure in a chamber can enable analysis of the liquid surface using vacuum-based chemical analysis instruments. No electrical or fluid connections are required to pass through the chamber walls. The systems can include a reservoir, a pump, and a liquid flow path. The reservoir contains a liquid-phase sample. The pump drives flow of the sample from the reservoir, through the liquid flow path, and back to the reservoir. The flow of the sample is not substantially driven by a differential between pressures inside and outside of the liquid flow path. An aperture in the liquid flow path exposes a stable portion of the liquid-phase sample to the vacuum pressure within the chamber. The radius, or size, of the aperture is less than or equal to a critical value required to support a meniscus of the liquid-phase sample by surface tension.

  20. Comparison of cold and warm vacuum systems for intersecting storage rings

    International Nuclear Information System (INIS)

    Halama, H.J.; Herrera, J.C.

    1975-01-01

    In storage rings employing superconducting magnets, the use of a cold bore as a cryopump appears, at first glance, as simple and economical. Since the selection of a cold or warm vacuum system has far-reaching implications on the basic design, each system is considered in some detail. The theoretical and practical limitations imposed on the maximum beam current by the gas desorption from the chamber walls are discussed. A realistic design of a cold vacuum chamber is developed and then compared with the proposed warm ISABELLE vacuum system. The comparison shows that the warm approach is preferable. (U.S.)

  1. Vacuum Technology

    Energy Technology Data Exchange (ETDEWEB)

    Biltoft, P J

    2004-10-15

    The environmental condition called vacuum is created any time the pressure of a gas is reduced compared to atmospheric pressure. On earth we typically create a vacuum by connecting a pump capable of moving gas to a relatively leak free vessel. Through operation of the gas pump the number of gas molecules per unit volume is decreased within the vessel. As soon as one creates a vacuum natural forces (in this case entropy) work to restore equilibrium pressure; the practical effect of this is that gas molecules attempt to enter the evacuated space by any means possible. It is useful to think of vacuum in terms of a gas at a pressure below atmospheric pressure. In even the best vacuum vessels ever created there are approximately 3,500,000 molecules of gas per cubic meter of volume remaining inside the vessel. The lowest pressure environment known is in interstellar space where there are approximately four molecules of gas per cubic meter. Researchers are currently developing vacuum technology components (pumps, gauges, valves, etc.) using micro electro mechanical systems (MEMS) technology. Miniature vacuum components and systems will open the possibility for significant savings in energy cost and will open the doors to advances in electronics, manufacturing and semiconductor fabrication. In conclusion, an understanding of the basic principles of vacuum technology as presented in this summary is essential for the successful execution of all projects that involve vacuum technology. Using the principles described above, a practitioner of vacuum technology can design a vacuum system that will achieve the project requirements.

  2. Vacuum system for the test accumulation ring for the NUMATRON project (TARN)

    International Nuclear Information System (INIS)

    Mizobuchi, Akira

    1979-01-01

    The vacuum system for the test accumulation ring for the NUMATRON project (TARN) being constructed in the Institute for Nuclear Study, University of Tokyo, for the purpose of accumulating fundamental data on high energy, heavy ion acceleration is presented. The main specifications of TARN are as follows: repetition rate 1 Hz, average radius 5.06 m, the radius of curvature 1.333 m, circumference 31.795 m, the length of a unit cell 3.974 m, the length of a long straight section 1.8 m, the number of unit cells 8, superperiodicity 8, and the structure of a unit cell FODO. The vacuum level of TARN lower than 1 x 10 -10 Torr is necessary. The preliminary test apparatuses, number one and two, for obtaining the basic data on superhigh vacuum were constructed. The characteristics of a molecular vacuum pump and the high temperature baking effect were tested with the number one test apparatus. The glow discharge cleaning effect of the model vacuum chamber for deflecting magnets was tested, utilizing the number two test apparatus. The pressure curve in course of time during pump down, the residual gas components, the residual gas spectrum in vacuum state and the change of residual gas components before and after the glow discharge cleaning are shown as these testing results. The vacuum gauges, which are used for TARN for measuring both the total pressure and the partial pressure of gas, are explained. The vacuum system, the vacuum chamber, the vacuum pumps, the expected exhausting speed and the partial functional test results for the vacuum system are introduced. (Nakai, Y.)

  3. Preliminary test of vacuum system of SPring-8 synchrotron

    International Nuclear Information System (INIS)

    Otsuka, Hideo; Yoneyama, Katsuji; Shimada, Taihei

    1992-01-01

    In this report, on the several points which it is desirable to be confirmed beforehand when the vacuum system of the synchrotron is designed, the results of the test by making the vacuum system for one normal cell simulating the actual machine are reported. Further by making three types of sample ducts, the ordinary type of 1.65 mm thickness, the rib-reinforced type of 0.3 mm thickness and bellows structure, the rate of released gas and the effect to eddy current were examined, for the purpose of taking the countermeasures to the eddy current accompanying the synchrotron operation. The mockup of the normal cell was composed of a duct of 10 m length, two ion pumps of 20 l/s, and a turbo molecular pump of 50 l/s, and the material of the ducts is SUS316L, and the sectional form is elliptic of 72 x 34. In the vacuum test of the normal cell, the exhaust characteristics at the time of rise and pressure distribution were verified. The measurement of the rate of released gas in the ducts and the measurement of current and voltage induced in the ducts are reported. The sufficient performance can be expected with the exhaust system used, and the time required for the rise of the vacuum system was clarified. (K.I.)

  4. Analysis of an innovative solar water desalination system using gravity induced vacuum

    International Nuclear Information System (INIS)

    Ayhan, T.; Al-Madani, H.

    2007-01-01

    This study presents the theoretical analysis, design and appropriate models of a new desalination system using gravity induced vacuum. The system utilizes natural means (gravity and atmospheric pressure) to create a vacuum under which water can be rapidly evaporated at much lower temperatures with less energy than conventional techniques. This technique is developed to overcome water storage, in the areas where good solar radiation (or waste heat sources) and sea water (or waste water sources). The developed system consists of an evaporator connected to condenser by means of a vacuum tank. The vapour produced in the evaporator is driven to condenser through the vacuum tank, where it condenses and collected as a product. Vacuum equivalent to 7 kPa (abs) or less can be created depending on ambient temperature of Bahrain climatic conditions. The effect of various operating conditions, namely water levels in condensation and evaporating columns on the system performance were studied. The theoretical analysis and preliminary experimental results show that the performance of this system depends on the condensation temperature

  5. Distributed remote temperature monitoring system for INDUS-2 vacuum chambers

    International Nuclear Information System (INIS)

    Bhange, N.J.; Gothwal, P.; Fatnani, P.; Shukla, S.K.

    2011-01-01

    Indus-2, a 2.5 GeV Synchrotron Radiation Source (SRS) at Indore has a large vacuum system. The vacuum envelope of Indus-2 ring comprises of 16 dipole chambers as vital parts. Each chamber has 4 photon absorbers and three beam line ports blanked with end flanges. Temperature monitoring of critical vacuum components during operation of Indus-2 ring is an important requirement. The paper discusses a distributed, 160 channel remote temperature monitoring system developed and deployed for this purpose using microcontroller based, modular Temperature Monitoring Units (TMU). The cabling has been extensively minimized using RS485 system and keeping trip relay contacts of all units in series. For ensuring proper signal conditioning of thermocouple outputs (K-type) and successful operation over RS485 bus, many precautions were taken considering the close proximity to the storage ring. We also discuss the software for vacuum chamber temperature monitoring and safety system. The software developed using LabVIEW, has important features like modularity, client-server architecture, local and global database logging, alarms and trips, event and error logging, provision of various important configurations, communications handling etc. (author)

  6. Application of the ALARP principle to a major refurbishment project at Sellafield

    International Nuclear Information System (INIS)

    Hendrickson, W.R.; Coates, R.

    1989-01-01

    A formalised structured approach to the ALARP principle has been developed and is being applied to occupational radiation exposure on a major refurbishment project at Sellafield. The processes consider the conceptual and subsequent detailed design stages, planning and operational control and incorporates a dose feedback and review system. The approach has led to significant dose savings so far on the project, with recorded doses being significantly less than the doses estimated at the preliminary assessment stage. (author)

  7. Refurbishment of Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Thompson, P.D.; Jaitly, R.; Ichiyen, N.; Petrilli, M.A.

    2004-01-01

    NB Power is planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) beginning in April 2008. The major activity would be the replacement of all 380 Fuel Channel and Calandria Tube Assemblies and the connecting feeder pipes. This activity is referred to as Retube. NB Power would also take advantage of this outage to conduct a number of repairs, replacements, inspections and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc). These collective activities are referred to as Refurbishment. This would allow the station to operate for an additional 25 to 30 years. The scope of the project was determined from the outcome of a two-year study involving a detailed condition assessment of the station that examined issues relating to ageing and obsolescence. The majority of the plant components were found to be capable of supporting extended operation without needing replacement or changes. In addition to the condition assessment, a detailed review of Safety and Licensing issues associated with extended operation was performed. This included a review of known regulatory and safety issues, comparison of the station against current codes and standards, and comparison of the station against safety related modifications made to more recent CANDU 6 units. Benefit cost analyses (BCA) were performed to assist the utility in determining which changes were appropriate to include in the project scope. As a Probabilistic Safety Assessment (PSA) for PLGS did not exist at the time, a risk baseline for the station had to be determined for use in the BCA. Extensive dialogue with the Canadian Nuclear Safety Commission staff was also undertaken during this phase. A comprehensive Licensing Framework was produced upon which the CNSC provided feedback to NB Power. This feedback was important in terms of

  8. Densifying the city: urban recycle as a strategic system to refurbish the built environment

    Directory of Open Access Journals (Sweden)

    Vittorino Belpoliti

    2015-11-01

    Full Text Available The persisting economic crisis and the necessity for more sustainable construction processes imply the need for innovative strategies to reuse the existing building stock. Retrofit and recycling plans are already active for whole city districts, adopting the urban densification strategy to reduce the consumption of resources, promoting the functional, technological, and energy refurbishment of the existing city districts The study introduces considerations and tools to increase the efficiency of retrofit action onto abandoned and degraded area through the improvement of their energy and environmental performances. 

  9. In-Space Repair and Refurbishment of Thermal Protection System Structures for Reusable Launch Vehicles

    Science.gov (United States)

    Singh, M.

    2007-01-01

    Advanced repair and refurbishment technologies are critically needed for the thermal protection system of current space transportation systems as well as for future launch and crew return vehicles. There is a history of damage to these systems from impact during ground handling or ice during launch. In addition, there exists the potential for in-orbit damage from micrometeoroid and orbital debris impact as well as different factors (weather, launch acoustics, shearing, etc.) during launch and re-entry. The GRC developed GRABER (Glenn Refractory Adhesive for Bonding and Exterior Repair) material has shown multiuse capability for repair of small cracks and damage in reinforced carbon-carbon (RCC) material. The concept consists of preparing an adhesive paste of desired ceramic with appropriate additives and then applying the paste to the damaged/cracked area of the RCC composites with an adhesive delivery system. The adhesive paste cures at 100-120 C and transforms into a high temperature ceramic during reentry conditions. A number of plasma torch and ArcJet tests were carried out to evaluate the crack repair capability of GRABER materials for Reinforced Carbon-Carbon (RCC) composites. For the large area repair applications, Integrated Systems for Tile and Leading Edge Repair (InSTALER) have been developed and evaluated under various ArcJet testing conditions. In this presentation, performance of the repair materials as applied to RCC is discussed. Additionally, critical in-space repair needs and technical challenges are reviewed.

  10. Application of programmable controllers to vacuum system interlocks

    International Nuclear Information System (INIS)

    Lee, G.; Moore, D.

    1979-11-01

    This paper describes the Doublet III Vacuum Control System in which all input signals and output loads are connected to a programmable controller (PC) for logical interfacing. Input signals derived from CAMAC, control panels, limit switches, etc., are implemented as output signals to CAMAC, vacuum valves, pump motors, etc., according to a logic program stored in the PC memory. The memory can be easily programmed by anyone familar with either Boolean algebra or relay-ladder network diagrams. The program data is entered with the aid of a calculator like, keyboard instrument with LED readout displays. The PC system contains a 1024 word RAM memory with a battery backup system to provide 72 hours protection of contents in case of power failure

  11. Vacuum system for the tokamak fusion test reactor (TFTR)

    International Nuclear Information System (INIS)

    Lange, W.J.; Green, D.; Sink, D.A.

    1976-01-01

    The vacuum system for TFTR is described. Insofar as possible, conventional and ultrahigh vacuum (UHV) components and technology will be employed. Subassemblies will be prebaked in vacuum to reduce subsequent outgassing, and assembly will employ TIG welding and metal gaskets. It is not anticipated that the totally assembled torus with its numerous diagnostic appendages will be baked in situ to a high temperature, however a lower bakeout temperature (approximately 250 0 C) is under consideration. Final vacuum conditioning will be performed using discharge cleaning to obtain a specific outgassing rate of less than or = to 10 -10 Torr liter/sec cm 2 hydrogen isotopes and less than or = to 10 -12 Torr liter/sec cm 2 of other gases, and a base pressure of less than or = to 5 x 10 -8 Torr

  12. Structural radioactive waste from 'retubing/refurbishment' of Embalse nuclear power plant. Regulatory perspective

    International Nuclear Information System (INIS)

    Alvarez, Daniela E.; Lee Gonzales, Horacio M.; Medici, Marcela A.; Piumetti, Elsa H.

    2009-01-01

    Unlike the building of a new nuclear reactor, the 'retubing / refurbishment' of nuclear reactors that have been in operation for many years, involves the replacement of components in a radioactive environment. This requires a carefully planned radiation protection program to ensure protection of workers, the public and the environment as well as a radioactive waste management program for those radioactive waste generated during the process, which go beyond those generated during the normal operation and maintenance of the plant. Nucleoelectrica Argentina Sociedad Anonima (NA-SA) is scheduled to conduct the Life Extension Process of Embalse Nuclear Power Plant (CNE) which essentially consist of 'retubing / refurbishment' of the installation. The Nuclear Regulatory Authority (ARN) will then have an important activity related to the above process. In particular, this paper will describe some points of interest related to the generation and management of radioactive waste during the 'retubing / refurbishment' of the CNE, from the regulatory point of view. (author)

  13. System Configuration Management Implementation Procedure for the Cold Vacuum Drying Facility Monitoring and Control System

    International Nuclear Information System (INIS)

    ANGLESEY, M.O.

    2000-01-01

    The purpose of this document is to establish the System Configuration Management Implementation Procedure (SCMIP) for the Cold Vacuum Drying Facility (CVDF) Monitoring and Control System (MCS). This procedure provides configuration management for the process control system. The process control system consists of equipment hardware and software that controls and monitors the instrumentation and equipment associated with the CVDF processes. Refer to SNF-3090, Cold Vacuum Drying Facility Monitoring and Control System Design Description, HNF-3553, Annex B, Safety Analysis Report for the Cold Vacuum Drying Facility, and AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration. This SCMIP identifies and defines the system configuration items in the control system, provides configuration control throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of these items

  14. ITER cryostat main chamber and vacuum vessel pressure suppression system design

    International Nuclear Information System (INIS)

    Ito, Akira; Nakahira, Masataka; Takahashi, Hiroyuki; Tada, Eisuke; Nakashima, Yoshitane; Ueno, Osamu

    1999-03-01

    Design of Cryostat Main Chamber and Vacuum Vessel Pressure Suppression System (VVPS) of International Thermonuclear Experimental Reactor (ITER) has been conducted. The cryostat is a cylindrical vessel that includes in-vessel component such as vacuum vessel, superconducting toroidal coils and poloidal coils. This cryostat provides the adiabatic vacuum about 10 -4 Pa for the superconducting coils operating at 4 K and forms the second confinement barrier to tritium. The adiabatic vacuum is to reduce thermal loads applied to the superconducting coils and their supports so as to keep their temperature 4 K. The VVPS consists of a suppression tank located under the lower bio-shield and 4 relief pipes to connect the vacuum vessel and the suppression tank. The VVPS is to keep the maximum pressure rise of the vacuum vessel below the design value of 0.5 MPa in case of the in-vessel LOCA (water spillage from in-vessel component). The spilled water and steam are lead to the suppression tank through the relief pipes when the internal pressure of vacuum vessel is over 0.2 MPa, and then the internal pressure is kept below 0.5 MPa. This report summarizes the structural design of the cryostat main chamber and pressure suppression system, together with their fabrication and installation. (author)

  15. ITER cryostat main chamber and vacuum vessel pressure suppression system design

    Energy Technology Data Exchange (ETDEWEB)

    Ito, Akira; Nakahira, Masataka; Takahashi, Hiroyuki; Tada, Eisuke [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Nakashima, Yoshitane; Ueno, Osamu

    1999-03-01

    Design of Cryostat Main Chamber and Vacuum Vessel Pressure Suppression System (VVPS) of International Thermonuclear Experimental Reactor (ITER) has been conducted. The cryostat is a cylindrical vessel that includes in-vessel component such as vacuum vessel, superconducting toroidal coils and poloidal coils. This cryostat provides the adiabatic vacuum about 10{sup -4} Pa for the superconducting coils operating at 4 K and forms the second confinement barrier to tritium. The adiabatic vacuum is to reduce thermal loads applied to the superconducting coils and their supports so as to keep their temperature 4 K. The VVPS consists of a suppression tank located under the lower bio-shield and 4 relief pipes to connect the vacuum vessel and the suppression tank. The VVPS is to keep the maximum pressure rise of the vacuum vessel below the design value of 0.5 MPa in case of the in-vessel LOCA (water spillage from in-vessel component). The spilled water and steam are lead to the suppression tank through the relief pipes when the internal pressure of vacuum vessel is over 0.2 MPa, and then the internal pressure is kept below 0.5 MPa. This report summarizes the structural design of the cryostat main chamber and pressure suppression system, together with their fabrication and installation. (author)

  16. Vacuum system design for the PEP-II B Factory High-Energy Ring

    International Nuclear Information System (INIS)

    Perkins, C.; Bostic, D.; Daly, E.

    1994-06-01

    The design of the vacuum system for the PEP-II B Factory High-Energy Ring is reviewed. The thermal design and vacuum requirements are particularly challenging in PEP-II due to high stored beam currents up to 3.0 amps in 1658 bunches. The vacuum chambers for the HER arcs are fabricated by electron beam welding extruded copper sections up to 6 m long. Design of these chambers and the vacuum PumPing configuration is described with results from vacuum and thermal analyses

  17. Refurbishment, Modernization and Ageing Management Program of The 3MW TRIGA Mark-II Research Reactor of Bangladesh

    International Nuclear Information System (INIS)

    Salam, M. A.

    2013-01-01

    The 3 MW TRIGA MK-II research reactor of Bangladesh Atomic Energy Commission (BAEC) achieved its first criticality on 14 September 1986. The reactor has been used for manpower training, radioisotope production and various R and D activities in the field of neutron activation analysis, neutron radiography and neutron scattering. Reactor Operation and Maintenance Unit (ROMU) is responsible for operation and maintenance of the research reactor. During the past twenty seven years ROMU carried out several refurbishments, replacement, modification and modernization activities in the reactor facility. The major tasks carried out under refurbishment program were replacement of the corrosion damaged N-16 decay tank by a new one, replacement of the fouled shell and tube type heat exchanger by a plate type one, modification of the shielding arrangements around the N-16 decay tank and ECCS system and solving the radial beam port-1 leakage problem. All of these refurbishment activities were performed under an annual development project (ADP) funded by Bangladesh government. BAEC research reactor (RR) was operated by analogue console system from its commissioning to July, 2011. Old analog based console has been replaced by digital console on June, 2012. Modernization program for the reactor control console due to obsolescence and unavailability of spare parts of I and C system was vital to restore the safe operation of the reactor. Considering these facts, installation of a digital control console and I and C system based on the state-of-the-art digital technology became necessary. Reactor digital console system installation tasks were performed under another ADP funded project by Bangladesh government. Now the reactor is operating with the digital control system. Besides this, the Neutron Radiography (NR) facility has been modernized by the addition of a digital neutron radiography set-up at the tangential beam port. The Neutron Scattering (NS) facility also has been upgraded

  18. Refurbishment, Modernization and Ageing Management Program of The 3MW TRIGA Mark-II Research Reactor of Bangladesh

    Energy Technology Data Exchange (ETDEWEB)

    Salam, M. A. [Atomic Energy Research Establishment, Dhaka (Bangladesh)

    2013-07-01

    The 3 MW TRIGA MK-II research reactor of Bangladesh Atomic Energy Commission (BAEC) achieved its first criticality on 14 September 1986. The reactor has been used for manpower training, radioisotope production and various R and D activities in the field of neutron activation analysis, neutron radiography and neutron scattering. Reactor Operation and Maintenance Unit (ROMU) is responsible for operation and maintenance of the research reactor. During the past twenty seven years ROMU carried out several refurbishments, replacement, modification and modernization activities in the reactor facility. The major tasks carried out under refurbishment program were replacement of the corrosion damaged N-16 decay tank by a new one, replacement of the fouled shell and tube type heat exchanger by a plate type one, modification of the shielding arrangements around the N-16 decay tank and ECCS system and solving the radial beam port-1 leakage problem. All of these refurbishment activities were performed under an annual development project (ADP) funded by Bangladesh government. BAEC research reactor (RR) was operated by analogue console system from its commissioning to July, 2011. Old analog based console has been replaced by digital console on June, 2012. Modernization program for the reactor control console due to obsolescence and unavailability of spare parts of I and C system was vital to restore the safe operation of the reactor. Considering these facts, installation of a digital control console and I and C system based on the state-of-the-art digital technology became necessary. Reactor digital console system installation tasks were performed under another ADP funded project by Bangladesh government. Now the reactor is operating with the digital control system. Besides this, the Neutron Radiography (NR) facility has been modernized by the addition of a digital neutron radiography set-up at the tangential beam port. The Neutron Scattering (NS) facility also has been upgraded

  19. Applying a CPLD for Refurbishment of a Multi-channel Pulse Height Analyzer

    International Nuclear Information System (INIS)

    Leetragunpichitchai, Supalerk; Thong-Aram, Decho; Ploykrachang, Kamontip

    2007-08-01

    Full text: This research applied a CPLD for construction of a 100 MHz, 2048 channel, Wilkinson type analog to digital converter (ADC) circuits for refurbishment of an original multi-channel pulse height analyzer (PHA) ADC. Introduction of the CPLD could reduce the complexity of the circuits, equipment size and also the power consumption while the operation speed was increased. The linearity test of the ADC was found to be excellent with an R2 = 0.9995 and a maximum pulse rate of 48.828 k cps could be converted in this system. Therefore the developed system was appropriate for replacing the original ADC

  20. PTC-6 vacuum system: WallWaler trademark Blastrac reg-sign shot blast cleaning system

    International Nuclear Information System (INIS)

    1998-02-01

    The LTC Americas, Inc. wall decontamination technology consisted of two pneumatic hand-held tools: (1) a roto-peen scaler that used star cutters and (2) a 3-piston hammer with reciprocating bits. The hand-held tools were used in conjunction with the LTC PTC-6 vacuum system which captured dust and debris as the wall decontamination took place. Recommendations for improved worker safety and health during use of the PTC-6 vacuum system with hand-held tools include: (1) keeping all hoses and lines as orderly as possible in compliance with good housekeeping requirements; (2) ergonomic training to include techniques in lifting, bending, stooping, twisting, etc.; (3) use of a clamping system to hold hoses to the vacuum system; (4) a safety line on the air line connections; (5) use of a mechanical lifting system for waste drum removal; and (6) the use of ergonomically designed tools

  1. TFTR ultrahigh-vacuum pumping system incorporating mercury diffusion pumps

    International Nuclear Information System (INIS)

    Sink, D.A.; Sniderman, M.

    1976-06-01

    The TFTR vacuum vessel will have a system of four 61 cm diameter mercury diffusion pumps to provide a base pressure in the 10 -8 to 10 -9 Torr range as well as a low impurity level within the vessel. The system, called the Torus Vacuum Pumping System (TVPS), will be employed with the aid of an occasional 250 0 C bakeout in situ as well as periodic applications of aggressive discharge cleaning. The TVPS is an ultrahigh-vacuum (UHV) system using no elastomers as well as being a closed system with respect to tritium or any tritiated gases. The backing system employing approximately 75 all-metal isolation valves is designed with the features of redundancy and flexibility employed in a variety of ways to meet the fundamental requirements and functions enumerated for the TVPS. Since the design, is one which is a modification of the conceptual design of the TVPS, those features which have changed are discussed. Calculations are presented for the major performance parameters anticipated for the TVPS and include conductances, effective pumping speeds, base pressures, operating parameters, getter pump parameters, and calculations of time constants associated with leak checking. Modifications in the vacuum pumping system for the guard regions on the twelve bellows sections are presented so that it is compatible with the main TVPS. The bellows pumping system consists of a mechanical pump unit, a zirconium aluminum getter pump unit and a residual gas analyzer. The control and management of the TVPS is described with particular attention given to providing both manual and automatic control at a local station and at the TFTR Central Control. Such operations as testing, maintenance, leak checking, startup, bakeout, and various other operations are considered in some detail. Various aspects related to normal pulsing, discharge cleaning, non-tritium operations and tritium operations are also taken into consideration. A cost estimate is presented

  2. Vacuum system for HIMAC synchrotrons

    International Nuclear Information System (INIS)

    Kanazawa, M.; Sudou, M.; Sato, K.

    1994-01-01

    HIMAC synchrotrons are now under construction, which require vacuum chambers of large aperture and high vacuum of about 10 -9 torr. Wide thin wall vacuum chamber of 0.3 mm thickness reinforced with ribs has been developed as the chamber at dipole magnet. We have just now started to evacuate the lower ring. The obtained average value was about 5x10 -8 torr with turbo-molecular and sputter ion pumps, and 1.1x10 -9 torr after baking. (author)

  3. The Role of Laser Additive Manufacturing Methods of Metals in Repair, Refurbishment and Remanufacturing - Enabling Circular Economy

    Science.gov (United States)

    Leino, Maija; Pekkarinen, Joonas; Soukka, Risto

    Circular economy is an economy model where products, components, and materials are aimed to be kept at their highest utility and value at all times. Repair, refurbishment and remanufacturing processes are procedures aiming at returning the value of the product during its life cycle. Additive manufacturing (AM) is expected to be an enabling technology in circular economy based business models. One of AM process that enables repair, refurbishment and remanufacturing is Directed Energy Deposition. Respectively Powder Bed Fusion enables manufacturing of replacement components on demand. The aim of this study is to identify the current research findings and state of art of utilizing AM in repair, refurbishment and remanufacturing processes of metallic products. The focus is in identifying possibilities of AM in promotion of circular economy and expected environmental benefits based on the found literature. Results of the study indicate significant potential in utilizing AM in repair, refurbishment and remanufacturing activities.

  4. Refurbishment and replacement efforts to mitigate ageing at Tarapur Atomic Power Station - an overview

    International Nuclear Information System (INIS)

    Katiyar, S.C.; Thattey, V.; Das, P.K.

    2006-01-01

    Tarapur Atomic Power Station (TAPS) - a twin Boiling Water Reactor unit and India's first Atomic Power Station was commissioned in April 1969, and was declared commercial in November 1969. Since then the light water moderated, low enriched uranium BWR with its demonstrated reliability and favourable economics is playing a vital role as a reliable source of power for the states of Maharashtra and Gujarat. The Power Station played a key role as a technology demonstrator validating the nuclear energy as safe and environmentally benign and economically viable alternate source of power generation in India. Built in the late sixties with state-of-the-art safety features prevailing then, TAPS has further evolved to be a safe plant with renovation and refurbishment efforts. Ageing Management Programme is in place at TAPS. Identification of systems, structures and components (SSCs) important to safety and availability, assessment of ageing degradation of these SSCs and mitigation through repair, replacement and refurbishment based on the investigations have enhanced the plant safety and reliability. The station's operating experience and feedback from BWRs operating abroad have also given inputs to Ageing Management Programme. A good number of major equipment have been replaced to mitigate ageing. Primary system piping, process heat exchangers, feed water heaters, turbine extraction system piping, turbine blades, emergency condenser tube bundles, various pumps, station batteries, electrical cables, circuit breakers etc. are some of them. Obsolescence is another aspect of ageing of a plant. Replacement of obsolete equipment and components particularly in C and I is another area where much headway has been made. Replacement and refurbishment of equipment have been done after detailed study and analysis so that current standards are met. Retrofitting the indigenously developed and fabricated equipment in a compact plant like TAPS was a difficult task and required lot of

  5. The design and structure of the ultra-high vacuum system of HIRFL-CSR

    International Nuclear Information System (INIS)

    Yang Xiaotian; Zhang Junhui; Zhang Xinjun; Meng Jun; Zhan Wenlong

    2001-01-01

    To minimize the beam loss due to charge exchange of very heavy ions with the residual gas molecules, ultra-high vacuum of 6x10 -9 Pa is required for the HIRFL-CSR facility, which is the lowest pressure in a large vacuum system in China up to now. The total length of the system is about 450 meters and the total inner surface is about 263 square meters. More than 500 standard vacuum components are needed and more than 400 different chambers have to be manufactured. A lot of researches have been down to try to find out the experiences to obtain the required pressure. In this article the following contents are described: the layout of the system; the structure of main vacuum chambers; the treatment method to reduce the outgassing rate of the chamber wall surfaces; vacuum equipment; pressure distribution and the progress of the system

  6. Energy Refurbishment of an Office Building with Hybrid Photovoltaic System and Demand-Side Management

    Directory of Open Access Journals (Sweden)

    Giovani Almeida Dávi

    2017-08-01

    Full Text Available On-site photovoltaic (PV and battery systems intend to improve buildings energy performance, however battery costs and monetary incentives are a major drawback for the introduction of these technologies into the electricity grids. This paper proposes an energy refurbishment of an office building based on multi-objective simulations. An innovative demand-side management approach is analyzed through the PV and battery control with the purpose of reducing grid power peaks and grid imported energy, as well as improving the project economy. Optimization results of load matching and grid interaction parameters, complemented with an economic analysis, are investigated in different scenarios. By means of battery use, the equivalent use of the grid connection is reduced by 12%, enhancing the grid interaction potential, and 10% of load matching rates can be increased. Project improvements indicate the grid connection capacity can be reduced by 13% and significant savings of up to 48% are achieved on yearly bills. The economy demonstrates the grid parity is only achieved for battery costs below 100 €/kWh and the payback period is large: 28 years. In the case with only PV system, the grid parity achieves better outcomes and the payback time is reduced by a half, making this a more attractive option.

  7. Vacuum system problems of EBT: a steady-state fusion experiment

    International Nuclear Information System (INIS)

    Livesey, R.L.

    1981-01-01

    Many of the vacuum problems faced by EBT will soon be shared by other plasma devices as high-power microwave systems and long pulse lengths become more common. The solutions used on EBT (such as the raised lip with elastomer seal) are not unique; however, experience has shown that microwave-compatible designs must be carefully thought out. All details of the vacuum must be carefully thought out. All details of the vacuum must be carefully screened in advance to insure that microwaves do not leak into pumps or diagnostics where they can cause major damage. Sputter coating, which even now is noticeably present in most pulsed plasma systems, becomes much worse as systems approach steady state. And finally, radiation degradation of components which is presently a minor problem will become significant on high-power microwave-fed devices, such as EBT-P

  8. Vacuum System and Modeling for the Materials Plasma Exposure Experiment

    International Nuclear Information System (INIS)

    Lumsdaine, Arnold; Meitner, Steve; Graves, Van; Bradley, Craig; Stone, Chris

    2017-01-01

    Understanding the science of plasma-material interactions (PMI) is essential for the future development of fusion facilities. The design of divertors and first walls for the next generation of long-pulse fusion facilities, such as a Fusion Nuclear Science Facility (FNSF) or a DEMO, requires significant PMI research and development. In order to meet this need, a new linear plasma facility, the Materials Plasma Exposure Experiment (MPEX) is proposed, which will produce divertor relevant plasma conditions for these next generation facilities. The device will be capable of handling low activation irradiated samples and be able to remove and replace samples without breaking vacuum. A Target Exchange Chamber (TEC) which can be disconnected from the high field environment in order to perform in-situ diagnostics is planned for the facility as well. The vacuum system for MPEX must be carefully designed in order to meet the requirements of the different heating systems, and to provide conditions at the target similar to those expected in a divertor. An automated coupling-decoupling (“autocoupler”) system is designed to create a high vacuum seal, and will allow the TEC to be disconnected without breaking vacuum in either the TEC or the primary plasma materials interaction chamber. This autocoupler, which can be actuated remotely in the presence of the high magnetic fields, has been designed and prototyped, and shows robustness in a variety of conditions. The vacuum system has been modeled using a simplified finite element analysis, and indicates that the design goals for the pressures in key regions of the facility are achievable.

  9. Ion beam analysis of gas turbine blades: evaluation of refurbishment ...

    Indian Academy of Sciences (India)

    Abstract. Refurbishment of hot components of gas turbines damaged in the harsh working environments is neces- ... 3000 r.p.m. and fluid forces that can cause fracture, yield- ... 800, 1200 and 2000 grit by employing mechanical grinding.

  10. Ultra high vacuum system for Isabelle full cell

    International Nuclear Information System (INIS)

    Skelton, R.; Briggs, J.; Chou, T.S.; Foerster, C.; Stattel, P.

    1979-01-01

    A vacuum system consisting of a 40 m long 8.8 cm diameter stainless steel tube, pumped by 7 pumping stations, has been assembled using automatic welding methods. All components have been fired at 950 0 C in a vacuum furnace at a pressure -4 Torr. Each pumping station contains a Ti-sublimator, a 30 liter/s ion pump and an UHV gauge. After assembly, the entire system was baked out at 250 0 C for 24 hours. A pressure -11 Torr was reached after titanium flash. Surface treatment of stainless for 10 -11 Torr operation, bake out and conditioning cycle to read 1 x 10 -11 Torr, and leak checking at low pressures are discussed

  11. Upgrading of TARN-II vacuum system

    International Nuclear Information System (INIS)

    Chida, K.; Arakaki, Y.; Yoshizawa, M.; Tomizawa, M.; Tanabe, T.; Katayama, I.

    1994-01-01

    Ion pumps and titanium getter pumps have been increased nearly twice in the TARN-II. The pumping speed per unit length is now improved up to 2/3 times that of TARN-I. An average vacuum pressure of 10 -11 Torr order has been achieved at beam time. Performance of the system after the upgrading is reported. (author)

  12. APS storage ring vacuum system performance

    International Nuclear Information System (INIS)

    Noonan, J.R.; Gagliano, J.; Goeppner, G.A.

    1997-01-01

    The Advanced Photon Source (APS) storage ring was designed to operated with 7-GeV, 100-mA positron beam with lifetimes > 20 hours. The lifetime is limited by residual gas scattering and Touschek scattering at this time. Photon-stimulated desorption and microwave power in the rf cavities are the main gas loads. Comparison of actual system gas loads and design calculations will be given. In addition, several special features of the storage ring vacuum system will be presented

  13. Extended layup of steam generators during a refurbishment outage

    International Nuclear Information System (INIS)

    Marks, C.R.; Little, M.D.; Slade, J.; Gendron, T.

    2009-01-01

    In May 2008, Point Lepreau Generating Station (PLGS), owned and operated by New Brunswick Power Nuclear (NBPN), entered an extended refurbishment outage initially expected to last approximately 18 months. NBPN had the two inter-related goals with respect to layup of the steam generators during this period: equipment preservation and inspection interval modification. The steam generators were to be preserved such that there was no loss of operating life due to corrosion of either the tubing (Alloy 800NG) or other internal components (with carbon steel being the limiting material with respect to corrosion). Additionally, NBPN desired that the time in layup not count as operating time in setting the schedule for future inspections. That is, a key goal of the steam generator layup is that the future inspection interval be based on operating time, not calendar time. The NBPN approach consists of the following four steps: A review of industry operating experience with long outages (including both PWRs and PHWRs); The development of technically based layup strategies and procedures; A mid-outage review of the implementation of the layup strategies and procedures; and A post-outage review to determine if the actual conditions in the steam generators will support modification of the inspection interval. This paper discusses the results of the first three of these steps. At this time, the plant is still in the refurbishment outage. Throughout the outage evaluation process, the following issues have been the main focus of the reviews: The potential for degradation (pitting and cracking) of steam generator tubes; The potential for general corrosion of carbon and low alloy steel internals; Oxidation of deposits (which could subsequently lead to oxidizing conditions during operation, possibly leading to tube degradation). This paper discusses the industry operating experience reviewed, the pre-outage assessments, and the mid-outage assessments. Current outage planning places the

  14. Vacuum mechatronics first international workshop

    Energy Technology Data Exchange (ETDEWEB)

    Belinski, S.E.; Shirazi, M.; Hackwood, S.; Beni, G. (eds.) (California Univ., Santa Barbara, CA (USA))

    1989-01-01

    This report contains papers on the following topics: proposed epitaxial thin film growth in the ultra-vacuum of space; particle monitoring and control in vacuum processing equipment; electrostatic dust collector for use in vacuum systems; materials evaluation of an electrically noisy vacuum slip ring assembly; an overview of lubrication and associated materials for vacuum service; the usage of lubricants in a vacuum environment; guidelines and practical applications for lubrication in vacuum; recent development in leak detector and calibrator designs; the durability of ballscrews for ultrahigh vacuum; vacuum-compatible robot for self-contained manufacturing systems; the design, fabrication, and assembly of an advanced vacuum robotics system for space payload calibration; design criteria for mechanisms used in space; and concepts and requirements for semiconductor multiprocess integration in vacuum. These papers are indexed separately elsewhere.

  15. Requirements and guidelines for NSLS experimental beam line vacuum systems: Revision A

    International Nuclear Information System (INIS)

    Foerster, C.; Halama, H.; Thomlinson, W.

    1986-10-01

    Requirements are provided for NSLS beam line front ends and vacuum interlocks. Guidelines are provided for UHV beam line vacuum systems, including materials, vacuum hardware (pumps, valves, and flanges), acoustic delay lines and beam line fast valves, instrumentation, fabrication and testing, and the NSLS cleaning facility. Also discussed are the design review for experimenters' equipment that would be connected to the NSLS and acceptance tests for any beam line to be connected with the ring vacuum. Also appended are a description of the acoustic delay line as well as the NSLS vacuum standards and NSLS procedures

  16. Fuel management during Cirus refurbishing and re-commissioning

    International Nuclear Information System (INIS)

    Rai, K.K.; Srivastava, Alok; Ramesh, N.; Sharma, R.C.

    2006-01-01

    Cirus is a Heavy water moderated and Demineralised water cooled 40 MW(th) research reactor. Graphite is used as reflector. Natural uranium in metallic form and clad in aluminium is used as fuel. After over three decades of operation, signs of ageing started surfacing up. Refurbishment plan was drawn up based upon ageing studies and performance review. Core unloading was the foremost requirement for jobs like assessment of integrity of primary coolant underground pipelines. Refuelling is carried out during reactor shut down with primary coolant pumps in operation. During the fuel unloading with the gradual removal of assemblies, reduction in the gross flow of primary coolant was also envisaged. The scheme for core unloading was formulated with emphasis on optimization of fuel utilization, cooling to the fuel assemblies during transit and overall safety of equipment and personnel. After completion of refurbishing jobs, it was decided to install dummy assemblies in pile to facilitate commissioning of primary coolant system. A lot of difficulty was faced due to release of iron oxide flakes from the surface of primary coolant pipelines. The inlet feeders, valves and dummy assemblies had to be periodically flushed to get rid of iron oxide flakes deposited during the period. Various efforts made to get rid of iron oxide flakes included increasing the velocity by bypassing the core, installation of hollow dummy assemblies and installation of strainer at core inlet. The decision of fuel loading was made based upon the experience feedback with dummy assemblies and assessment of the pattern of release of iron oxide flakes. The dummy assemblies were replaced with uranium fuel assemblies. Fuelling work was carried out with Reactor hall crane with additional precautions. This paper describes the experience with handling of irradiated fuel assemblies to facilitate core unloading, experience with dummy assemblies and loading of fuel into the core and subsequent performance

  17. The Control System of CERN Accelerators Vacuum (Current Status and Recent Improvements)

    CERN Document Server

    Gomes, P; Blanchard, S; Boccioli, M; Girardot, G; Vestergard, H; Kopylov, L; Mikheev, M

    2011-01-01

    The vacuum control system of most of the CERN accelerators is based on Siemens PLCs and on PVSS SCADA. After the transition from the LHC commissioning phase to its regular operation, there has been a number of additions and improvements to the vacuum control system. They were driven by new technical requirements and by feedback from the accelerator operators and vacuum specialists. New control functions have been implemented in the PLCs; new tools have been developed for the SCADA, while its ergonomics and navigation have been enhanced.

  18. EAST-AIA deployment under vacuum: Calibration of laser diagnostic system using computer vision

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Yang, E-mail: yangyang@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); Song, Yuntao; Cheng, Yong; Feng, Hansheng; Wu, Zhenwei; Li, Yingying; Sun, Yongjun; Zheng, Lei [Institute of Plasma Physics, Chinese Academy of Sciences, 350 Shushanhu Rd, Hefei, Anhui (China); Bruno, Vincent; Eric, Villedieu [CEA-IRFM, F-13108 Saint-Paul-Lez-Durance (France)

    2016-11-15

    Highlights: • The first deployment of the EAST articulated inspection arm robot under vacuum is presented. • A computer vision based approach to measure the laser spot displacement is proposed. • An experiment on the real EAST tokamak is performed to validate the proposed measure approach, and the results shows that the measurement accuracy satisfies the requirement. - Abstract: For the operation of EAST tokamak, it is crucial to ensure that all the diagnostic systems are in the good condition in order to reflect the plasma status properly. However, most of the diagnostic systems are mounted inside the tokamak vacuum vessel, which makes them extremely difficult to maintain under high vacuum condition during the tokamak operation. Thanks to a system called EAST articulated inspection arm robot (EAST-AIA), the examination of these in-vessel diagnostic systems can be performed by an embedded camera carried by the robot. In this paper, a computer vision algorithm has been developed to calibrate a laser diagnostic system with the help of a monocular camera at the robot end. In order to estimate the displacement of the laser diagnostic system with respect to the vacuum vessel, several visual markers were attached to the inner wall. This experiment was conducted both on the EAST vacuum vessel mock-up and the real EAST tokamak under vacuum condition. As a result, the accuracy of the displacement measurement was within 3 mm under the current camera resolution, which satisfied the laser diagnostic system calibration.

  19. Development of a Modified Vacuum Cleaner for Lunar Surface Systems

    Science.gov (United States)

    Toon, Katherine P.; Lee, Steve A.; Edgerly, Rachel D.

    2010-01-01

    The National Aeronautics and Space Administration (NASA) mission to expand space exploration will return humans to the Moon with the goal of maintaining a long-term presence. One challenge that NASA will face returning to the Moon is managing the lunar regolith found on the Moon's surface, which will collect on extravehicular activity (EVA) suits and other equipment. Based on the Apollo experience, the issues astronauts encountered with lunar regolith included eye/lung irritation, and various hardware failures (seals, screw threads, electrical connectors and fabric contamination), which were all related to inadequate lunar regolith mitigation. A vacuum cleaner capable of detaching, transferring, and efficiently capturing lunar regolith has been proposed as a method to mitigate the lunar regolith problem in the habitable environment on lunar surface. In order to develop this vacuum, a modified "off-the-shelf' vacuum cleaner will be used to determine detachment efficiency, vacuum requirements, and optimal cleaning techniques to ensure efficient dust removal in habitable lunar surfaces, EVA spacesuits, and air exchange volume. During the initial development of the Lunar Surface System vacuum cleaner, systematic testing was performed with varying flow rates on multiple surfaces (fabrics and metallics), atmospheric (14.7 psia) and reduced pressures (10.2 and 8.3 psia), different vacuum tool attachments, and several vacuum cleaning techniques in order to determine the performance requirements for the vacuum cleaner. The data recorded during testing was evaluated by calculating particulate removal, relative to the retained simulant on the tested surface. In addition, optical microscopy was used to determine particle size distribution retained on the surface. The scope of this paper is to explain the initial phase of vacuum cleaner development, including historical Apollo mission data, current state-of-the-art vacuum cleaner technology, and vacuum cleaner testing that has

  20. Review of Current Nuclear Vacuum System Technologies

    International Nuclear Information System (INIS)

    Carroll, M.; McCracken, J.; Shope, T.

    2003-01-01

    Nearly all industrial operations generate unwanted dust, particulate matter, and/or liquid wastes. Waste dust and particulates can be readily tracked to other work locations, and airborne particulates can be spread through ventilation systems to all locations within a building, and even vented outside the building - a serious concern for processes involving hazardous, radioactive, or nuclear materials. Several varieties of vacuum systems have been proposed and/or are commercially available for clean up of both solid and liquid hazardous and nuclear materials. A review of current technologies highlights both the advantages and disadvantages of the various systems, and demonstrates the need for a system designed to address issues specific to hazardous and nuclear material cleanup. A review of previous and current hazardous/nuclear material cleanup technologies is presented. From simple conventional vacuums modified for use in industrial operations, to systems specifically engineered for such purposes, the advantages and disadvantages are examined in light of the following criteria: minimal worker exposure; minimal secondary waste generation;reduced equipment maintenance and consumable parts; simplicity of design, yet fully compatible with all waste types; and ease of use. The work effort reviews past, existing and proposed technologies in light of such considerations. Accomplishments of selected systems are presented, including identified areas where technological improvements could be suggested

  1. REQUIREMENTS AND GUIDELINES FOR NSLS EXPERIMENTAL BEAM LINE VACUUM SYSTEMS-REVISION B

    International Nuclear Information System (INIS)

    FOERSTER, C.

    1999-01-01

    Typical beam lines are comprised of an assembly of vacuum valves and shutters referred to as a ''front end'', optical elements to monochromatize, focus and split the photon beam, and an experimental area where a target sample is placed into the photon beam and data from the interaction is detected and recorded. Windows are used to separate sections of beam lines that are not compatible with storage ring ultra high vacuum. Some experimental beam lines share a common vacuum with storage rings. Sections of beam lines are only allowed to vent up to atmospheric pressure using pure nitrogen gas after a vacuum barrier is established to protect ring vacuum. The front end may only be bled up when there is no current in the machine. This is especially true on the VUV storage ring where for most experiments, windows are not used. For the shorter wavelength, more energetic photons of the x-ray ring, beryllium windows are used at various beam line locations so that the monochromator, mirror box or sample chamber may be used in a helium atmosphere or rough vacuum. The window separates ring vacuum from the environment of the downstream beam line components. The stored beam lifetime in the storage rings and the maintenance of desirable reflection properties of optical surfaces depend upon hydrocarbon-free, ultra-high vacuum systems. Storage ring vacuum systems will operate at pressures of ∼ 1 x 10 -10 Torr without beam and ∼ 1 x 10 -9 Torr with beam. Systems are free of hydrocarbons in the sense that no pumps, valves, etc. containing organics are used. Components are all-metal, chemically cleaned and bakeable. To the extent that beam lines share a common vacuum with the storage ring, the same criteria will hold for beam line components. The design philosophy for NSLS beam lines is to use all-metal, hydrocarbon-free front end components and recommend that experimenters use this approach for common vacuum hardware downstream of front ends. O-ring-sealed valves, if used, are not

  2. PTC-6 vacuum system: WallWalker{trademark} and Blastrac{reg_sign} shot blast cleaning system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The LTC Americas, Inc. wall decontamination technology consisted of two pneumatic hand-held tools: (1) a roto-peen scaler that used star cutters and (2) a 3-piston hammer with reciprocating bits. The hand-held tools were used in conjunction with the LTC PTC-6 vacuum system which captured dust and debris as the wall decontamination took place. Recommendations for improved worker safety and health during use of the PTC-6 vacuum system with hand-held tools include: (1) keeping all hoses and lines as orderly as possible in compliance with good housekeeping requirements; (2) ergonomic training to include techniques in lifting, bending, stooping, twisting, etc.; (3) use of a clamping system to hold hoses to the vacuum system; (4) a safety line on the air line connections; (5) use of a mechanical lifting system for waste drum removal; and (6) the use of ergonomically designed tools.

  3. The control system of CERN accelerators vacuum (current status and recent improvements)

    International Nuclear Information System (INIS)

    Gomes, P.; Antoniotti, F.; Blanchard, S.; Boccioli, M.; Girardot, G.; Vestergard, H.; Kopylov, L.; Mikheev, M.

    2012-01-01

    The vacuum control system of most of the CERN accelerators is based on Siemens PLCs and on PVSS SCADA. After the transition from the LHC commissioning phase to its regular operation, there has been a number of additions and improvements to the vacuum control system. They were driven by new technical requirements and by feedback from the accelerator operators and vacuum specialists. New control functions have been implemented in the PLCs; new tools have been developed for the SCADA, while its ergonomic and navigation have been enhanced. (authors)

  4. Analysis of the steady-state operation of vacuum systems for fusion machines

    International Nuclear Information System (INIS)

    Roose, T.R.; Hoffman, M.A.; Carlson, G.A.

    1975-01-01

    A computer code named GASBAL was written to calculate the steady-state vacuum system performance of multi-chamber mirror machines as well as rather complex conventional multichamber vacuum systems. Application of the code, with some modifications, to the quasi-steady tokamak operating period should also be possible. Basically, GASBAL analyzes free molecular gas flow in a system consisting of a central chamber (the plasma chamber) connected by conductances to an arbitrary number of one- or two-chamber peripheral tanks. Each of the peripheral tanks may have vacuum pumping capability (pumping speed), sources of cold gas, and sources of energetic atoms. The central chamber may have actual vacuum pumping capability, as well as a plasma capable of ionizing injected atoms and impinging gas molecules and ''pumping'' them to a peripheral chamber. The GASBAL code was used in the preliminary design of a large mirror machine experiment--LLL's MX

  5. Ultra high vacuum system of the 3 MeV electron beam accelerator

    International Nuclear Information System (INIS)

    Puthran, G.P.; Jayaprakash, D.; Mishra, R.L.; Ghodke, S.R.; Majumder, R.; Mittal, K.C.; Sethi, R.C.

    2003-01-01

    Full text: A 3 MeV electron beam accelerator is coming up at the electron beam centre, Kharghar, Navi Mumbai. A vacuum of the order of 1x10 -7 mbar is desired in the beam line of the accelerator. The UHV system is spread over a height of 6 meters. The total surface area exposed to vacuum is 65,000 cm 2 and the volume is 200 litres. Distributed pumping is planned, to avoid undesirable vacuum gradient between any two sections of the beam-line. The electron beam is scanned in an area of 6 cms x 100 cms and it comes out of the scan-horn through a titanium foil of 50 micron thick. Hence the vacuum system is designed in such a way that, in the event of foil rupture during beam extraction, the electron gun, accelerating column and the pumps can be protected from sudden air rush. The vacuum in the beam-line can also be maintained in this condition. After changing the foil, scan-horn area can be separately pumped to bring the vacuum level as desired and can be opened to the beam-line. The design, vacuum pumping scheme and the safety aspects are discussed in this paper

  6. Design for ANL 7 GeV storage ring vacuum system

    International Nuclear Information System (INIS)

    Wehrle, R.B.; Nielsen, R.W.

    1988-01-01

    The 7-GeV Advanced Photon Source (APS) design includes a storage ring having a 1060-m circumference with the capability of accommodating 34 insertion devices (ID) and their associated photon beam lines. An additional 35 photon lines can be provided from bending magnets. The vacuum system for the storage ring is designed to maintain a beam-on operating pressure of 1n Torr or less to achieve a positron beam lifetime of approximately 20 hours. The vacuum system and it's current developmental status are described

  7. Design of dry scroll vacuum pumping system for efficient pumping of corrosive gas at medium vacuum range

    International Nuclear Information System (INIS)

    Banerjee, I.; Chandresh, B.G.; Guha, K.C.; Sarkar, S.

    2015-01-01

    Dry vacuum pumping systems attracts many applications because of its inherent capability of corrosion free pumping. It becomes a common trait of application in Thermo Nuclear Fusion, Semi conductor, Isotope separation industries etc. Thermo nuclear fusion requires a train of specially sealed roots pump backed by suitable capacity dry screw or reciprocating pump. Similarly corrosive fluoride gas pumping requires hermetically sealed specially designed dry scroll vacuum pump. Plant emergency operation however involves train of specially sealed roots pump backed with scroll pump for faster evacuation. In our attempt an indigenously designed scroll pump and associated system are designed to pump corrosive gases in a way to confine the corrosion product within the system. In order to execute the design, a numerical code for low pressure application is developed

  8. Refurbishment of the LECI

    International Nuclear Information System (INIS)

    Blanc, J. Y.; Cheron, C.

    2001-01-01

    The LECI is a hot laboratory built in Saclay in the early sixties for examinations on fuel rods, with 25 hot cells. Around 1995, a refurbishment programme up to 2004 was decided and started. It includes the renovation of about half of the cells of the existing building and the construction of a new building with about twenty lead-shielded hot cells for mechanical testing. At mid 2001, this paper presents the status of the project and the perspectives for the next years. These modifications aims: -To increase sample preparation and examination capacities on nuclear metals: mainly zirconium, steel and aluminium alloys. -To keep existing P. I. facilities on short P. W. R. fuel rod as support for ramp testing programmes in the nearby Osiris reactor and as support for new cladding development programmes. -To gather in LECI mechanical testing facilities which are up to now located in another facility to be shut down at the end of 2003. Concerning the existing building, most of the planned refurbishment has been performed and 10 cells have been cleaned and 8 of them will be reequipped at the end of 2001: a metallography line with new microscope, hardness testing, periscopes, TEM thin foil and EPMA preparation, two cells for tooling mechanical samples (milling machine, lathe, spark erosion), one cell for clad creep testing on long term storage conditions and a cell with a 250 kN tensile machine. The new building is built, the lead cells will be installed in 2002 and most of the scientific equipment have been ordered. They include: wire erosion machining 3 tensile machines with extensometry, 2 Charpy, different creep and internal pressure machines, autoclaves EPMA and Raman analysis. The schedule is to open this building to irradiated materials ( no fuel except on EPMA) at the end of 2003. Some difficulties such as the public enquires have been successfully overcome, some financial constraints have delayed the project of about one year, and technical difficulties have

  9. Proposal for the risk management implementation phase in oil field development project by adding value on the refurbishment of critical equipment

    Directory of Open Access Journals (Sweden)

    Hamid Abdul

    2017-01-01

    Full Text Available Refurbishment process is a conceptual stage in product life cycle. It is utilized in existing equipment in the field by adding value to recondition and repaired equipment. The main interest of this paper is to implement and design risk management implementation phase in oil field development project on the refurbishment of critical equipment in oil and gas industry. This paper is provided base on research and experiences in risk management and learned from practical team in industry which matched by an application in oil field development project in refurbishment of critical equipment. A framework of implementation phase for risk management in oil field development project in refurbishment critical equipment were reviewed and added value on communication skills of the project team to the stakeholder and organization, which support to external body and vice-versa. Risk management framework can be used for reference of refurbishment process with simply process and developed with same concept for the next wide development project in industry.

  10. Conceptual Design of ILC Damping Ring Wiggler Straight Vacuum System

    International Nuclear Information System (INIS)

    Marks, S.; Kennedy, K.; Plate, D.; Schlueter, R.D.; Zisman, M.

    2007-01-01

    The positron and electron damping rings for the International Linear Collider will contain long straight sections consisting of twenty wiggler/quadrupole pairs. The wigglers will be based upon the CESR superconducting design. There are a number of challenges associated with the design of the wiggler straight vacuum system, in particular, the absorption of photon power generated by the wigglers. This paper will present the overall conceptual design of the wiggler straight vacuum system developed for the ILC Reference Design Report. Particular emphasis will be placed on photon power load calculations and the absorber design

  11. REQUIREMENTS AND GUIDELINES FOR NSLS EXPERIMENTAL BEAM LINE VACUUM SYSTEMS-REVISION B.

    Energy Technology Data Exchange (ETDEWEB)

    FOERSTER,C.

    1999-05-01

    Typical beam lines are comprised of an assembly of vacuum valves and shutters referred to as a ''front end'', optical elements to monochromatize, focus and split the photon beam, and an experimental area where a target sample is placed into the photon beam and data from the interaction is detected and recorded. Windows are used to separate sections of beam lines that are not compatible with storage ring ultra high vacuum. Some experimental beam lines share a common vacuum with storage rings. Sections of beam lines are only allowed to vent up to atmospheric pressure using pure nitrogen gas after a vacuum barrier is established to protect ring vacuum. The front end may only be bled up when there is no current in the machine. This is especially true on the VUV storage ring where for most experiments, windows are not used. For the shorter wavelength, more energetic photons of the x-ray ring, beryllium windows are used at various beam line locations so that the monochromator, mirror box or sample chamber may be used in a helium atmosphere or rough vacuum. The window separates ring vacuum from the environment of the downstream beam line components. The stored beam lifetime in the storage rings and the maintenance of desirable reflection properties of optical surfaces depend upon hydrocarbon-free, ultra-high vacuum systems. Storage ring vacuum systems will operate at pressures of {approximately} 1 x 10{sup {minus}10} Torr without beam and {approximately} 1 x 10{sup {minus}9} Torr with beam. Systems are free of hydrocarbons in the sense that no pumps, valves, etc. containing organics are used. Components are all-metal, chemically cleaned and bakeable. To the extent that beam lines share a common vacuum with the storage ring, the same criteria will hold for beam line components. The design philosophy for NSLS beam lines is to use all-metal, hydrocarbon-free front end components and recommend that experimenters use this approach for common vacuum hardware

  12. Design and performance of main vacuum pumping system of SST-1 Tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Ziauddin, E-mail: ziauddin@ipr.res.in; Pathan, Firozkhan; George, Siju; Dhanani, Kalpesh; Paravastu, Yuvakiran; Semwal, Pratibha; Pradhan, Subrata

    2014-01-15

    Highlights: •SST-1 Tokamak was successfully commissioned. •Vacuum vessel and cryostat were pumped down to 6.3 × 10{sup −7} mbar and 1.3 × 10{sup −5} mbar. •Leaks developed during baking were detected in-situ by RGA and confirmed later on. •Cryo-pumping effect was observed when LN2 thermal shields reached below 273 K. •Non-standard aluminum wire-seals have shown leak tightness < 1.0 × 10{sup −9} mbar l/s. -- Abstract: Steady-state Superconducting Tokamak (SST-1) was installed and it is commissioning for overall vacuum integrity, magnet systems functionality in terms of successful cool down to 4.5 K and charging up to 10 kA current was started from August 2012. Plasma operation of 100 kA current for more than 100 ms was also envisaged. It is comprised of vacuum vessel (VV) and cryostat (CST). Vacuum vessel, an ultra-high (UHV) vacuum chamber with net volume of 23 m{sup 3} was maintained at the base pressure of 6.3 × 10{sup −7} mbar for plasma confinement. Cryostat, a high-vacuum (HV) chamber with empty volume 39 m{sup 3} housing superconducting magnet system, bubble thermal shields and hydraulics for these circuits, maintained at 1.3 × 10{sup −5} mbar in order to provide suitable environment for these components. In order to achieve these ultimate vacuums, two numbers of turbo-molecular pumps (TMP) are installed in vacuum vessel while three numbers of turbo-molecular pumps are installed in cryostat. Initial pumping of both the chambers was carried out by using suitable Roots pumps. PXI based real time controlled system is used for remote operation of the complete pumping operation. In order to achieve UHV inside the vacuum vessel, it was baked at 150 °C for longer duration. Aluminum wire-seals were used for all non-circular demountable ports and a leak tightness < 1.0 × 10{sup −9} mbar l/s were achieved.

  13. The vacuum system for the PEP II high energy ring straight sections

    International Nuclear Information System (INIS)

    Wienands, U.; Daly, E.; Heifets, S.A.; Kulikov, A.; Kurita, N.; Nordby, M.; Perkins, C.; Reuter, E.; Seeman, J.T.; Belser, F.C.; Berg, J.; Holdener, F.R.; Kerns, J.A.; McDaniel, M.R.; Stoeffl, W.

    1995-01-01

    The six straight sections of the PEP II High Energy Ring (HER) serve various functions: lattice tuning, beam injection and abort, providing space for rf cavities, longitudinal and transverse feedback, beam diagnostics and the interaction point. A stainless steel vacuum system has been designed; prototypes are currently being built. Cooling is required due to radiation coming from the last arc dipole and resistive losses in the vacuum chamber. Although the nominal beam current of the HER is 1 A the vacuum system is designed for 3 A to provide margin and an upgrade path. 5 refs., 7 figs

  14. Limiter/vacuum system for plasma impurity control and exhaust in tokamaks

    International Nuclear Information System (INIS)

    Abdou, M.; Brooks, J.; Mattas, R.

    1980-01-01

    A detailed design of a limiter/vacuum system for plasma impurity control and exhaust has been developed for the STARFIRE tokamak power plant. It is shown that the limiter/vacuum concept is a very attractive option for power reactors. It is relatively simple and inexpensive and deserves serious experimental verification

  15. Baking system for vacuum components in INDUS-2

    International Nuclear Information System (INIS)

    Bhange, Nilesh J.; Bhatnagar, Prateek; Shukla, S.K.

    2005-01-01

    Optimized bake-out procedures are very important for the overall reliability of vacuum system. In this process the UHV components like Sputter ion pump (SIP), Titanium sublimation pump (TSP) are subjected to temperature rise for sufficiently long period of time. Baking is necessary for obtaining low out gassing rates. In order to provide controlled baking of UHV (Ultra High Vacuum) components for INDUS-II an intelligent ON/OFF control system was needed. For that purpose distributed control system was suitable. For fulfillment of this need modular baking system was developed. This system contains Temperature controller unit (TCU), Pressure Monitoring Unit (PMU), and Temperature control and pressure Monitoring Interface Software (TCPMIS). Each TCU is an eight channel temperature controlling unit. PMU is eight channel pressure monitoring unit to which analog data from gauges like Penning, BA Gauge controllers is given. TCPMIS is a user interface software developed for, controlling up to 5 TCU's. In this way 40 channel temperature control, data logging of 40 channel temperature and logging of eight channel pressures was realized. The present paper describes details about computer controlled baking system. (author)

  16. The vacuum system for technological unit development and design

    Science.gov (United States)

    Zhukeshov, A. M.; Gabdullina, A. T.; Amrenova, A. U.; Giniyatova, Sh G.; Kaibar, A.; Sundetov, A.; Fermakhan, K.

    2015-11-01

    The paper shows results of development of plasma technological unit on the basis of accelerator of vacuum arc and automated system. During the previous years, the authors investigated the operation of pulsed plasma accelerator and developed unique technologies for hardening of materials. Principles of plasma formation in pulsed plasma accelerator were put into basis of the developed unit. Operation of the pulsed arc accelerator was investigated at different parameters of the charge. The developed vacuum system is designed for production of hi-tech plasma units in high technologies in fields of nanomaterials, mechanical and power engineering and production with high added value. Unlike integrated solutions, the system is a module one to allow its low cost, high reliability and simple maintenance. The problems of use of robots are discussed to modernize the technological process.

  17. The vacuum system for technological unit development and design

    International Nuclear Information System (INIS)

    Zhukeshov, A M; Gabdullina, A T; Amrenova, A U; Giniyatova, Sh G; Kaibar, A; Sundetov, A; Fermakhan, K

    2015-01-01

    The paper shows results of development of plasma technological unit on the basis of accelerator of vacuum arc and automated system. During the previous years, the authors investigated the operation of pulsed plasma accelerator and developed unique technologies for hardening of materials. Principles of plasma formation in pulsed plasma accelerator were put into basis of the developed unit. Operation of the pulsed arc accelerator was investigated at different parameters of the charge. The developed vacuum system is designed for production of hi-tech plasma units in high technologies in fields of nanomaterials, mechanical and power engineering and production with high added value. Unlike integrated solutions, the system is a module one to allow its low cost, high reliability and simple maintenance. The problems of use of robots are discussed to modernize the technological process. (paper)

  18. Cold Vacuum Dryer (CVD) Facility Security System Design Description. System 54

    International Nuclear Information System (INIS)

    WHITEHURST, R.

    2000-01-01

    This system design description (SDD) addresses the Cold Vacuum Drying (CVD) Facility security system. The system's primary purpose is to provide reasonable assurance that breaches of security boundaries are detected and assessment information is provided to protective force personnel. In addition, the system is utilized by Operations to support reduced personnel radiation goals and to provide reasonable assurance that only authorized personnel are allowed to enter designated security areas

  19. Vacuum system of the Tokamak Novillo

    International Nuclear Information System (INIS)

    Valencia Alvarado, R.; Lopez Callejas, R.; Melendez Lugo, L.; Chavez Alarcon, E.

    1990-01-01

    A toroidal vacuum chamber of 28 access ports was constructed from four stainless steel 316L elbows joined together with dielectric seals to provide voltage break in the toroidal direction. All vacuum seals were viton O-rings. A 500 1/s turbomolecular pump provide a base pressure of 4 x 10 -8 mbar with light backing (∼ 60 deg C). In the regime of cleaning discharge the toroidal chamber is filled with H 2 to a pressure of 0.2 + 0.4 mbar. The ohmic heating coils are pulsed with a AF oscillator (10 kW, 17.5 kHz) for 60-80 msec, at a repetition rate of about 2 Hz. A toroidal magnetic field of roughly 600 G is added to generate the cleaning discharge. According to a residual gas analyzer installed in the system, 80% of the base pressure was given by water; the other components were hydrogen and mon- and dioxides of carbon. (Author)

  20. Beam vacuum system of Brookhaven's muon storage ring

    International Nuclear Information System (INIS)

    Hseuth, H.C.; Snydstrup, L.; Mapes, M.

    1995-01-01

    A storage ring with a circumference of 45 m is being built at Brookhaven to measure the g-2 value of the muons to an accuracy of 0.35 ppm.. The beam vacuum system of the storage ring will operate at 10 -7 Torr and has to be completely non-magnetic. It consists of twelve sector chambers. The chambers are constructed of aluminum and are approximately 3.5 m in length with a rectangular cross-section of 16.5 cm high by 45 cm at the widest point. The design features, fabrication techniques and cleaning methods for these chambers are described. The beam vacuum system will be pumped by forty eight non-magnetic distributed ion pumps with a total pumping speed of over 2000 ell/sec. Monte Carlo simulations of the pressure distribution in the muon storage region are presented

  1. Report on participation of the operational dosimetry division in refurbishment of the RA reactor, Task 3.08/04-13; Podzadatak 3.08/04-13 Izvestaj o ucescu Odseka operativne dozimetrije RZ u remontnim radovima na Reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the refurbishment of the RA reactor, from January to June 1963 the division of operational division had a very important role and comprehensive tasks. To enable safety of the staff it was necessary to provide protection clothes, personnel dosemeters; permanent monitoring of radiation doses; strict control of the procedures for completing the planned maintenance and repair operations to avoid contamination of the personnel and working space. The refurbishment activities described in this report are: removal of fuel from the core; refurbishment of the heavy water system; decontamination of the distillation equipment; repair of the gas system.

  2. Airline fuel saving through JT9D engine refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    Allison, J.W.; Weisel, D.R.

    1981-01-01

    Areas are identified in the JT9D engine where the potential exists for either further performance recovery following repair, or for improved performance retention. A number of new procedures and tools which will improve performance recovery are described. Improvements in inspection techniques are discussed. Operational techniques which will improve performance retention and impact degree of refurbishment required are also presented.

  3. Cold Vacuum Drying facility potable water system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) potable water (PW) system. The PW system provides potable water to the CVDF for supply to sinks, water closets, urinals, showers, custodial service sinks, drinking fountains, the decontamination shower, supply water to the non-PW systems, and makeup water for the de-ionized water system

  4. Status of FRJ-2 refurbishment of tank pipes and essential results of aging analysis

    International Nuclear Information System (INIS)

    Hansen, G.; Thamm, G.; Thome, M.

    1993-01-01

    An aging evaluation program for FRJ-2 (DIDO) of the Forschungszentrum Juelich GmbH has been developed and is currently executed in cooperation with the licensing and regulatory and TUV experts in order to determine the overall life expectancy of the facility and to identify critical systems and components that need to be upgraded or refurbished for future safe reactor operation. In Phase A (completed) a so called master list of the FRJ-2 mechanical, electrical and structural components was compiled on a system-by system basis and the operational documentation with respect to regular inspections, maintenance, repair and unusual occurences was carefully examined. Critical components were selected and their ageing respectively life limiting mechanisms identified. In Phase (currently under way) special inspections, examinations and tests for critical systems/components are being elaborated, executed and evaluated. Current work is being concentrated on non replaceable components (e.g. reactor aluminium tank (RAT) and the connecting pipes to the primary cooling circuit, the reactor steel tank and pipe work inside the concrete reactor block). As a consequence of first results of the aging evaluation program and due to leaks in the weir and drain pipes of the RAT a repair/refurbishment program was set up for the Al-RAT pipes (risers, downcomers weir and drain pipes) and the steel guide tubes. Details of the r/r program which is in far progress and first essential results of the aging evaluation will be presented. The results achieved until today are encouraging with respect to safe reactor operation on short and medium term. (author)

  5. Status of FRJ-2 Refurbishment of tank pipes and essential results of aging analysis

    International Nuclear Information System (INIS)

    Hansen, G.; Thamm, G.; Thome, M.

    1994-01-01

    An aging evaluation program for FRJ-2 (DIDO) of the Forschungszentrum Juelich GmbH has been developed and is currently executed in cooperation with the licensing and regulatory and TUEV experts in order to determine the overall life expectancy of the facility and to identify critical systems and components that need to be upgraded or refurbished for future safe reactor operation. In Phase A (completed) a so called master list of the FRJ-2 mechanical, electrical and structural components was compiled on a system-by system basis and the operational documentation with respect to regular inspections, maintenance, repair and unusual occurrences was carefully examined. Critical components were selected and their ageing respectively life limiting mechanisms identified. In Phase B (currently under way) special inspections, examinations and tests for critical systems/components are being elaborated, executed and evaluated. Current work is being concentrated on non replaceable components (e.g. reactor aluminium tank (RAT) and the connecting pipes to the primary cooling circuit, the reactor steel tank and pipe work inside the concrete reactor block). As a consequence of first results of the aging evaluation program and due to leaks in the weir and drain pipes of the RAT a repair/refurbishment program was set up for the Al-RAT pipes (risers, downcomers, weir and drain pipes) and the steel guide tubes. Details of the r/r program which is in far progress and first essential results of the aging evaluation will be presented. The results achieved until today are encouraging with respect to safe reactor operation on short and medium term. (J.P.N.)

  6. Refurbishment of the regulating and control equipment, Task 3.08/04-05; Zadatak 3.08/04-05 Remont uredjaja za regulaciju i upravljanje

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Popovic, B [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    In addition to the planned refurbishment and maintenance of the RA reactor control and regulating systems, this report describes the maintenance of the reactor protection and safety systems. According to the instructions included in this report the components of these systems were tested to verify their reliability.

  7. Baking controller for synchrotron beamline vacuum systems

    International Nuclear Information System (INIS)

    Garg, C.K.; Kane, S.R.; Dhamgaye, V.P.

    2003-01-01

    The 2.5 GeV electron storage ring Indus-2 is a hard X-ray Synchrotron Radiation (SR) Source. Nearly 27 beamlines will be installed on Indus-2 and they will cater to different experiments and applications. Most of the beamlines will be in Ultra High Vacuum (UHV) the only exception being hard X-rays beamlines. However the front ends of all the beamlines will be in UHV. Practicing UHV requires efforts and patience. Evacuating any chamber, volume gases can be removed easily. However, outgassing phenomena like desorption, diffusion and permeation restricts the system to attain UHV. All processes except the volume gas removal are temperature dependent. At ambient temperature, gas pressure decreases so slowly that outgassing limit (i.e. 10 -10 1/s/cm 2 ) can hardly be achieved on a practical time scale. Also there are three orders of magnitude difference in outgassing between baked and unbaked systems. Depending on the vacuum chamber and the components inside it, the thermal outgassing (baking) of system is required and can be done at various temperatures between 150 degC to 450 deg C. For whole baking cycle, constant monitoring and controlling of the systems is required which takes tens of hours. This paper describes the automation for such baking system, which will be used for SR beamlines

  8. Conditioning of the vacuum system of the TPS storage ring without baking in situ

    International Nuclear Information System (INIS)

    Chan, C.K.; Chang, C.C.; Shueh, C.; Yang, I.C.; Wu, L.H.; Chen, B.Y.; Cheng, C.M.; Huang, Y.T.; Chuang, J.Y.; Cheng, Y.T.; Hsiao, Y.M.; Sheng, Albert

    2017-01-01

    To shorten the machine downtime, a maintenance procedure without baking in situ has been developed and applied to maintain and to upgrade the vacuum system of the TPS storage ring. The data of photon-stimulated desorption (PSD) reveal no obvious discrepancy between baking and not baking the vacuum system in situ. A beam-conditioning dose of extent only 11.8 A h is required to recover quickly the dynamic pressure of an unbaked vacuum system to its pre-intervention value according to the TPS maintenance experience.

  9. Conditioning of the vacuum system of the TPS storage ring without baking in situ

    Energy Technology Data Exchange (ETDEWEB)

    Chan, C.K., E-mail: ckchan@nsrrc.org.tw; Chang, C.C.; Shueh, C.; Yang, I.C.; Wu, L.H.; Chen, B.Y.; Cheng, C.M.; Huang, Y.T.; Chuang, J.Y.; Cheng, Y.T.; Hsiao, Y.M.; Sheng, Albert

    2017-04-11

    To shorten the machine downtime, a maintenance procedure without baking in situ has been developed and applied to maintain and to upgrade the vacuum system of the TPS storage ring. The data of photon-stimulated desorption (PSD) reveal no obvious discrepancy between baking and not baking the vacuum system in situ. A beam-conditioning dose of extent only 11.8 A h is required to recover quickly the dynamic pressure of an unbaked vacuum system to its pre-intervention value according to the TPS maintenance experience.

  10. Conditioning of the vacuum system of the TPS storage ring without baking in situ

    Science.gov (United States)

    Chan, C. K.; Chang, C. C.; Shueh, C.; Yang, I. C.; Wu, L. H.; Chen, B. Y.; Cheng, C. M.; Huang, Y. T.; Chuang, J. Y.; Cheng, Y. T.; Hsiao, Y. M.; Sheng, Albert

    2017-04-01

    To shorten the machine downtime, a maintenance procedure without baking in situ has been developed and applied to maintain and to upgrade the vacuum system of the TPS storage ring. The data of photon-stimulated desorption (PSD) reveal no obvious discrepancy between baking and not baking the vacuum system in situ. A beam-conditioning dose of extent only 11.8 A h is required to recover quickly the dynamic pressure of an unbaked vacuum system to its pre-intervention value according to the TPS maintenance experience.

  11. Cold Vacuum Drying Facility Condensate Collection System Design Description. System 19

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    2000-01-01

    The Cold Vacuum Drying (CVD) Facility of Spent Nuclear Fuel (SNF) provides required process systems, supporting equipment, and facilities to support the SNF Project mission. This system design description (SDD) addresses the Condensate Collection System (CCS). This is a general service system. The CCS begins at the condensate outlet of the general process air-handling unit (AHU) and the condensate outlets for the active process bays AHUs. The system terminates at each condensate collection tank (5 total)

  12. Thermal protection and refurbishment of an old building. Lectures; Waermeschutz und Altbausanierung. Vortraege

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Within the 22nd Hanseatic Reconstruction Symposium at the Baltic Seaside Heringsdorf/Usedom (Federal Republic of Germany) from 3rd to 5th November 2011, the following lectures were held: (1) Energetic refurbishment possibilities for building within existing properties by means of representative examples (F. Deitschum); (2) Constructional thermal insulation and indoor climate - for the good of the environment? (S. Groer); (3) Innovative insulating materials for the structural refurbishment? (O. Fechner); (4) Energetic half-timbering refurbishment (K. Lissner); (5) Wooden solar facades for existing buildings (U. Schwarz); (6) Timber beam bowls in a historic brickwork (U. Mueller); (7) Timber beam bowls and interior insulation (U. Ruisinger); (8) Innovative solutions for cavity filling insulations (A. Stefenelli); (9) Thermal insulating plaster - also for historical buildings (T. Stahl); (10) Experimental tension analysis of the structural behaviour of historical cross vaults (A.-J. Petereit); (10) Investigation of the increase of the flexural strength of stonework constructions with self-compacting steel fibre reinforced concrete (D. Haessler); (11) Dry and dense - the modified WTA leaflet 4-6, 'Subsequent sealing of components in contact with soil' - Content and innovations (R. Spirgatis); (12) What does the new standard DIN 68800 hold? (H. Willeitner); (13) News from the standard DIN 18195 waterproofing of buildings (H.-P. Sommer); (14) Liability of planning of the offering entrepreneur (H. Immoor); (15) Climate change and preservation of structures (W. Zillig); (16) Typical problems and deficiencies of the energetic refurbishment of old store buildings (H. Boehmer); (17) When do ex post horizontal sealings with injection agents make sense - Fundamentals for evaluation, planning and execution (F.-J. Hoelzen); (18) Drying up behaviour of stonework of different quality and at different variants of insulation (F. Antretter).

  13. Refurbishment of Cirus in-core components

    International Nuclear Information System (INIS)

    Bhatnagar, A.; Sahu, A.K.; Rathore, K.K.; Subudhi, D.; Kharpate, A.V.; Tikku, A.C.

    2006-01-01

    Circus is a 40- MWt vertical tank type research reactor with natural uranium as fuel, demineralised light water as coolant, heavy water as moderator and graphite as reflector. The reactor was commissioned in the year 1960 and operated at an overage availability factor of over 70% till early nineties, when various systems, structures and components (SSCs) started showing signs of ageing. Detailed ageing studies were therefore carried out to assess the condition of various SSCs and refurbishing requirements were finalized towards extending the life of the reactor. In-core components, being non-replaceable generally, were critically examined to the extent possible. Detailed visual examination of a few reactor vessel (RV) tubes, made of aluminium, was carried out using micro video camera and in addition all the RV tubes were inspected using eddy current testing method. RV shell, also made of aluminium, was similarly visually inspected with micro video camera. To assess the effect of irradiation on the RV material, samples of similar tubes irradiated to comparable neutron fluence were tested. Towards assessment of fatigue life of RV expansion joint, made of aluminium, a finite element analysis using NISA computer code was performed. Theoretical assessment for stored Wigner energy in graphite reflector was carried out. Graphite block samples were also removed from the reactor and stored energy levels were measured to plan for any in-situ graphite annealing, if required. Visual inspection of approachable portions of steel and aluminium thermal shields was also carried out. These water-cooled thermal shields provided above and below the RV were hydro tested. The weld joint between coolant inlet pipe and top plate of upper aluminium shield showed minor leakage. A special metallic hollow plug was developed and remotely installed in the leaky pipe to isolate the leaky portion while maintaining the coolant flow in the pipe. Helium leak was found from flange joints located on

  14. Fast response system for vacuum volume emergency separation

    International Nuclear Information System (INIS)

    Gubrienko, K.I.; Lastochkin, Yu.A.

    1982-01-01

    A system which allows to separate vacuum systems of the magnetic-optic beam channels connected with the accelerator has been worked out for case of emergency environment break through the extraction ''window''. The system, consisting of two valve - gate devices and a control unit, allows one in the emergency case to separate more than 20 m long volume from the accelerator without any pressure changes in the latter one

  15. Cold Vacuum Drying (CVD) Electrical System Design Description

    International Nuclear Information System (INIS)

    SINGH, G.

    2000-01-01

    This system design description (SDD) provides a technical explanation of the design and operation of the electrical system for the Cold Vacuum Drying Facility (CVDF). This SDD also identifies the requirements, and the basis for the requirements and details on how the requirements have been implemented in the design and construction of the facility. This SDD also provides general guidance for the surveillance, testing, and maintenance of this system

  16. Cold Vacuum Drying Safety Class Instrumentation and Control System Design Description

    International Nuclear Information System (INIS)

    WHITEHURST, R.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) Safety Class Instrumentation and Control system (SCIC). The SCIC provides safety functions and features to protect the environment, off-site and on-site personnel and equipment. The function of the SCIC is to provide automatic trip features, valve interlocks, alarms, indication and control for the cold vacuum drying process

  17. Physicochemical characteristics and occupational exposure to coarse, fine and ultrafine particles during building refurbishment activities

    Energy Technology Data Exchange (ETDEWEB)

    Azarmi, Farhad; Kumar, Prashant, E-mail: p.kumar@surrey.ac.uk, E-mail: prashant.kumar@cantab.net; Mulheron, Mike [University of Surrey, Department of Civil and Environmental Engineering, Faculty of Engineering and Physical Sciences (United Kingdom); Colaux, Julien L.; Jeynes, Chris [University of Surrey, Faculty of Engineering and Physical Sciences, Ion Beam Centre (United Kingdom); Adhami, Siavash; Watts, John F. [University of Surrey, The Surface Analysis Laboratory, Faculty of Engineering and Physical Sciences (United Kingdom)

    2015-08-15

    Understanding of the emissions of coarse (PM{sub 10} ≤10 μm), fine (PM{sub 2.5} ≤2.5 μm) and ultrafine particles (UFP <100 nm) from refurbishment activities and their dispersion into the nearby environment is of primary importance for developing efficient risk assessment and management strategies in the construction and demolition industry. This study investigates the release, occupational exposure and physicochemical properties of particulate matter, including UFPs, from over 20 different refurbishment activities occurring at an operational building site. Particles were measured in the 5–10,000-nm-size range using a fast response differential mobility spectrometer and a GRIMM particle spectrometer for 55 h over 8 days. The UFPs were found to account for >90 % of the total particle number concentrations and <10 % of the total mass concentrations released during the recorded activities. The highest UFP concentrations were 4860, 740, 650 and 500 times above the background value during wall-chasing, drilling, cementing and general demolition activities, respectively. Scanning electron microscopy, X-ray photoelectron spectroscopy and ion beam analysis were used to identify physicochemical characteristics of particles and attribute them to probable sources considering the size and the nature of the particles. The results confirm that refurbishment activities produce significant levels (both number and mass) of airborne particles, indicating a need to develop appropriate regulations for the control of occupational exposure of operatives undertaking building refurbishment.

  18. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  19. Refurbish research and test reactors corresponding to global age of nuclear energy

    International Nuclear Information System (INIS)

    Mishima, Kaichiro; Oyama, Yukio; Okamoto, Koji; Yamana, Hajime; Yamaguchi, Akira

    2011-01-01

    This special article featured arguments for refurbishment of research and test reactors corresponding to global age of nuclear energy, based on the report: 'Investigation of research facilities necessary for future joint usage' issued by the special committee of Atomic Energy Society of Japan (AESJ) in September 2010. It consisted of six papers titled as 'Introduction-establishment of AESJ special committee for investigation', 'State of research and test reactors in Japan', 'State of overseas research and test reactors', 'Needs analysis for research and test reactors', 'Proposal of AESJ special committee' and 'Summary and future issues'. In order to develop human resources and promote research and development needed in global age of nuclear energy, research and test reactors would be refurbished as an Asian regional center of excellence. (T. Tanaka)

  20. Summary of ACSL Simulations of the MSRE Auxiliary Charcoal Bed Vacuum System

    Energy Technology Data Exchange (ETDEWEB)

    Damiano, B

    2000-10-26

    The simulation of the Auxiliary Charcoal Bed (ACB) Vacuum System was performed to evaluate the original vacuum system design, detect and identify design deficiencies, investigate the effects of proposed corrections on system performance, and generally aid in refining the system design before construction and mockup testing. The simulation was performed by using the Advanced Continuous Simulation Language (ACSL). The vacuum system design goals are to provide approximately 20 SCFM of both booster gas and purge gas through the system and maintain a flow of approximately 40 SCFM with a velocity of 50 to 75 f/sec at the entrance to the cyclone separator. The model results showed that the original system design was incapable of meeting the system performance goals. Further simulations showed that the following modifications to the original vacuum system design were required to make the system performance acceptable; (1) Remove valve PCV4. (2) Modify the flow controllers FTC3 and FTC4 from the original flow range of 0-17.6 SCFM (0-500 SLM) to 0-35.3 SCFM (0-1000 SLM). (3) Replace the bellows sealed valves SV-1, SV-3A, SV-3B, SV-4A, and SV-4B with less restrictive ball valves. The simulation results saved considerable time and effort by identifying flaws in the original system design. Early identification of these flaws and the use of the simulation model to investigate possible solutions allowed corrective modifications to be made before construction of the mock up test facility.

  1. ATLAS magnet common cryogenic, vacuum, electrical and control systems

    CERN Document Server

    Miele, P; Delruelle, N; Geich-Gimbel, C; Haug, F; Olesen, G; Pengo, R; Sbrissa, E; Tyrvainen, H; ten Kate, H H J

    2004-01-01

    The superconducting Magnet System for the ATLAS detector at the LHC at CERN comprises a Barrel Toroid, two End Cap Toroids and a Central Solenoid with overall dimensions of 20 m diameter by 26 m length and a stored energy of 1.6 GJ. Common proximity cryogenic and electrical systems for the toroids are implemented. The Cryogenic System provides the cooling power for the 3 toroid magnets considered as a single cold mass (600 tons) and for the CS. The 21 kA toroid and the 8 kA solenoid electrical circuits comprise both a switch-mode power supply, two circuit breakers, water cooled bus bars, He cooled current leads and the diode resistor ramp-down unit. The Vacuum System consists of a group of primary rotary pumps and sets of high vacuum diffusion pumps connected to each individual cryostat. The Magnet Safety System guarantees the magnet protection and human safety through slow and fast dump treatment. The Magnet Control System ensures control, regulation and monitoring of the operation of the magnets. The update...

  2. Vacuum control system of VEC

    International Nuclear Information System (INIS)

    Roy, Anindya; Bhole, R.B.; Bandopadhyay, D.L.; Mukhopadhyay, B.; Pal, Sarbajit; Sarkar, D.

    2009-01-01

    As a part of modernization of VEC (Variable Energy Cyclotron), the Vacuum Control System is being upgraded to PLC based automated system from initial Relay based Manual system. EPICS (Experimental Physics and Industrial Control System), a standard open source software tool for designing distributed control system, is chosen for developing the supervisory control software layer, leading towards a unified distributed control architecture of VEC Control System. A Modbus - TCP based IOC (I/O Controller) has been developed to communicate control data to PLC using Ethernet-TCP LAN. Keeping in mind, the operators' familiarity with MS-Windows, a MS-Windows based operator interface is developed using VB6. It is also used to test and evaluate EPICS compatibility to MS Windows. Several MS Windows ActiveX components e.g. text display, image display, alarm window, set-point input etc. have been developed incorporating Channel Access library of EPICS. Use of such components ease the programming complexity and reduce developmental time of the operator interface. The system is in the final phase of commissioning. (author)

  3. Task 3.08/04-04, refurbishment of the dosimetry control equipment; Zadatak 3.08/04-04 Remont uredjaja dozimetrijske kontrole

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Milosevic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During three years of operation the designed RA dosimetry system showed satisfactory performance. During the period planned for maintenance and refurbishment of the RA reactor the functionality of the dosimetry system was tested and verified, the components were cleaned and calibrated. The system was operated for 24 hours for testing the reliability of components and whole system. This report describes detailed instructions and actions performed for these activities.

  4. Recent results on cleaning and conditioning the ATF vacuum system

    International Nuclear Information System (INIS)

    Langley, R.A.; Clark, T.L.; Glowienka, J.C.; Goulding, R.H.; Mioduszewski, P.K.; Rasmussen, D.A.; Rayburn, T.F.; Schaich, C.R.; Shepard, T.D.; Simpkins, J.E.; Yarber, J.L.

    1990-01-01

    Techniques for cleaning and conditioning the vacuum vessel of the Advanced Toroidal Facility (ATF) and its internal components are described. The vacuum vessel cleaning technique combines baking to 150 degree C and glow discharges with hydrogen gas. Chromium gettering is used to further condition the system. The major internal components are the anodized aluminum baffles in the Thomson scattering system, a graphite-shielded ICRF antenna, two graphite limiters, and a diagnostic graphite plate. Three independent heating systems are used to bake some of the major components of the system. The major characteristics used for assessing cleanliness and conditioning progress are the maximum pressure attained during bakeout, the results of gas analysis, and revelant plasma parameters (e.g., time to radiative decay). Details of the various cleaning and conditioning procedures and results are presented

  5. Development of a control system for compression and expansion cycles of critical valve for high vacuum systems

    Energy Technology Data Exchange (ETDEWEB)

    Agarwal, Jyoti, E-mail: jagarwal@ipr.res.in; Sharma, H.; Patel, Haresh; Gangradey, R.; Lambade, Vrushabh

    2016-11-15

    Highlights: • Control system with feedback loop of pressure gauge is developed for measuring the life cycle of vacuum isolation valve. • GUI based software developed for easy use and handling of control system. • Control system tested with an experiment showcasing the capability of the control system. • Control system can operate valve based on pressure inside the chamber, which helps to know the degradation of sealing capabilities of valve. • Control system can monitor the total closing and opening time of valve, cycles and pressure inside the vessel. - Abstract: A control system with feedback loop is designed, developed and tested to monitor the life cycles of the axial valve and bellows used in vacuum valves. The control system monitors number of compression cycles of any bellow or closing and opening cycle of a valve. It also interfaces vacuum gauges or pressure gauges to get pressure values inside the system. To find life cycle of valve, the developed control and monitoring system is integrated with an axial valve experimental test set up. In this system, feedback from the vacuum gauge attached to valve enclosure, is given and the life cycle test is automated. This paper describes the control and monitoring system in details and briefs the experiment carried out for valve life cycle. The same system can be used for life cycle estimate for bellows. A suitable GUI is also developed to control the function of the components and resister the number of cycles.

  6. OSIRIS. Refurbishment and management of ageing effects

    International Nuclear Information System (INIS)

    Joly, C.; Guidez, J.; Contenson, G. de; Marin, J.P.

    1995-01-01

    OSIRIS, one of the French CEA research reactors (Saclay, France), achieved criticality for the first time on July 1966. During the 29 running years OSIRIS was mainly devoted to production and technological irradiations. To satisfy these objectives, OSIRIS is equipped by different test facilities allowing: the long time irradiation of different material including fuel rods, reactor vessel materials, fusion reactor components; the power ramps of fuel rods; the activation analysis; the neutron-radiography of materials and test sections... All the foreseen irradiation programmes will only be possible if safety and high performances of the reactor are guaranteed. That is why a continuous maintenance and improvement programme has taken place during the whole life of the reactor. This paper gives an overview of this programme, mainly about the part conducted during the last years. Details about characteristics of the reactor, history of experiments, maintenance programme, instrumentation and control system, electrotechnical low voltage supply network, decay tanks and water purification system are summarized. The paper focuses on the refurbishment or the replacement of the main components connected to the continuous maintenance programme to guarantee the reliability, the safety and the high performances of the reactor. (J.S.). 2 refs., 8 figs., 2 tabs

  7. Vacuum leak detector and method

    Science.gov (United States)

    Edwards, Jr., David

    1983-01-01

    Apparatus and method for detecting leakage in a vacuum system involves a moisture trap chamber connected to the vacuum system and to a pressure gauge. Moisture in the trap chamber is captured by freezing or by a moisture adsorbent to reduce the residual water vapor pressure therein to a negligible amount. The pressure gauge is then read to determine whether the vacuum system is leaky. By directing a stream of carbon dioxide or helium at potentially leaky parts of the vacuum system, the apparatus can be used with supplemental means to locate leaks.

  8. Small might be beautiful, but bigger performs better: Scale economies in “green” refurbishments of apartment housing

    International Nuclear Information System (INIS)

    Michelsen, Claus; Rosenschon, Sebastian; Schulz, Christian

    2015-01-01

    The energy efficiency of the residential housing stock plays a key role in strategies to mitigate climate change and global warming. In this context, it is frequently argued that private investment and the quality of thermal upgrades are too low in the light of the challenges faced and the potential energy cost savings. While many authors address the potential barriers for investors to increase energy efficiency, studies on the capabilities of different investors to reduce energy requirements of their property are scarce. This study investigates potential advantages of housing company's size, i.e. economies of scale, economies of scope and institutional learning in thermal upgrades of residential housing. Based on unique data on energy consumption in 102,307 apartment buildings in Germany, we present new evidence for the advantages and disadvantages of a housing company's size in “green” retrofitting projects. Our estimations show, that large housing companies outperform private landlords by far in high effort refurbishment projects. In contrast, private landlords appear to have advantages in low effort, incremental refurbishment activities. We demonstrate that a substantial share of the advantages of larger firms can be associated with specialization (i.e. repeated projects). The results offer new options for policy makers to refine the support schemes toward a low carbon housing stock. - Highlights: • First study to analyze the effects of housing companies size on “green” refurbishment • Economies of scale, scope and learning all affect energy efficiency refurbishments. • Specialization on distinct refurbishments influences outcome of thermal upgrades. • Analysis based on a large and unique sample of apartment buildings in Germany

  9. Can observations inside the Solar System reveal the gravitational properties of the quantum vacuum?

    CERN Document Server

    Hajdukovic, Dragan Slavkov

    2013-01-01

    The understanding of the gravitational properties of the quantum vacuum might be the next scientific revolution.It was recently proposed that the quantum vacuum contains the virtual gravitational dipoles; we argue that this hypothesis might be tested within the Solar System. The key point is that quantum vacuum ("enriched" with the gravitational dipoles) induces a retrograde precession of the perihelion. It is obvious that this phenomenon might eventually be revealed by more accurate studies of orbits of planets and orbits of the artificial Earth satellites. However, we suggest that potentialy the best "laboratory" for the study of the gravitational properties of the quantum vacuum is the Dwarf Planet Eris and its satellite Dysnomia; the distance of nearly 100AU makes it the unique system in which the precession of the perihelion of Dysnomia (around Eris) is strongly dominated by the quantum vacuum.

  10. Open loop, auto reversing liquid nitrogen circulation thermal system for thermo vacuum chamber

    International Nuclear Information System (INIS)

    Naidu, M C A; Nolakha, Dinesh; Saharkar, B S; Kavani, K M; Patel, D R

    2012-01-01

    In a thermo vacuum chamber, attaining and controlling low and high temperatures (-100 Deg. C to +120 Deg. C) is a very important task. This paper describes the development of 'Open loop, auto reversing liquid nitrogen based thermal system'. System specifications, features, open loop auto reversing system, liquid nitrogen flow paths etc. are discussed in this paper. This thermal system consists of solenoid operated cryogenic valves, double embossed thermal plate (shroud), heating elements, temperature sensors and PLC. Bulky items like blowers, heating chambers, liquid nitrogen injection chambers, huge pipe lines and valves were not used. This entire thermal system is very simple to operate and PLC based, fully auto system with auto tuned to given set temperatures. This system requires a very nominal amount of liquid nitrogen (approx. 80 liters / hour) while conducting thermo vacuum tests. This system was integrated to 1.2m dia thermo vacuum chamber, as a part of its augmentation, to conduct extreme temperature cycling tests on passive antenna reflectors of satellites.

  11. Cold Vacuum Drying (CVD) Electrical System Design Description

    International Nuclear Information System (INIS)

    BRISBIN, S.A.

    1999-01-01

    This document provides a technical explanation of the design and operation of the electrical system for the Cold Vacuum Drying Facility. This document identifies the requirements, and the basis for the requirements and details on how the requirements have been implemented in the design and construction of the facility. This document also provides general guidance for the surveillance, testing, and maintenance of this system

  12. Bruce A refurbishment - preparatory work completed, major tasks to begin soon

    International Nuclear Information System (INIS)

    Boyd, F.

    2006-01-01

    Over the past year Bruce Power has been planning and organizing for an extensive refurbishment of the Units 1 and 2 of the Bruce A station. Now the company and its several major contractors are ready to proceed with the most challenging aspects of the actual work. The largest tasks are the replacement of the 8 steam generators and of the 480 complete fuel channels in each unit Bruce Power has created a separate website connected to their basic one to provide ongoing information about the progress of the work. The following brief note is intended to provide an outline of this challenging refurbishment program and to invite readers to visit this website to follow its progress. To provide background the writer was accorded an informative and interesting tour of the units by Rob Liddle, of Bruce Power, on September 28, 2006 the day after the ceremony commemorating the Douglas Point station held at the Bruce site. (author)

  13. Ultra-high vacuum system of the Brookhaven National Synchrotron Light Source

    Energy Technology Data Exchange (ETDEWEB)

    Foerster, C.L.

    1995-12-31

    The rings of the National Synchrotron Light Source (NSLS) have been supplying light to numerous users for approximately a decade and we recently enjoyed a fully conditioned machine vacuum at design currents. A brief description of the X-Ray storage ring, the VUV storage ring and their current supply is given along with some of their features. The ultra-high vacuum system employed for the storage rings and their advantages for the necessary stored beam environments are discussed including, a brief history of time. After several hundred amp hours of stored beam current operation, very little improvement in machine performance was seen due to conditioning. Sections of the rings were vented, to dry nitrogen and replacement components were pre-baked and pre-argon glow conditioned prior to installation. Very little machine conditioning was needed to return to operation after recovering vacuum due to well established conditioning procedures. All straight sections in the X-Ray ring and the VUV ring have been filled with various insertion devices and most are fully operational. Each storage ring has a computer controlled total pressure and partial pressure monitoring system for the ring and its beam ports, to insure good vacuum.

  14. Cold Vacuum Drying facility fire protection system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) fire protection system (FPS). The FPS provides fire detection, suppression, and loss limitation for the CVDF structure, personnel, and in-process spent nuclear fuel. The system provides, along with supporting interfacing systems, detection, alarm, and activation instrumentation and controls, distributive piping system, isolation valves, and materials and controls to limit combustibles and the associated fire loadings

  15. Refurbishment of BR2 (Phase 4 and 5)[1997 Scientific Report of the Belgian Nuclear Research Centre

    Energy Technology Data Exchange (ETDEWEB)

    Gubel, P.; Dekeyser, J.; Van der Auwera, J.

    1998-07-01

    The extensive refurbishment of the BR-2 materials testing reactor should allow another 10 to 15years of continued operation. The refurbishment programme is required in order to comply with modern safety standards, to enhance the reliability of operation, and to compensate for the ageing of the installations of a facility that has reached about 35 years of intensive service. The main objectives and achievements of phase 4 and 5 are described.

  16. Modernization and Refurbishment of the RECH-1 Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Daie, J. [Nuclear Application Department, Chilean Nuclear Energy Commission (CCHEN), Santiago (Chile)

    2014-08-15

    The Chilean Nuclear Energy Commission (Comisión Chilena de Energía Nuclear, or CCHEN) has operated the RECH-1 research reactor since 1974. This reactor is located at La Reina Nuclear Centre in Santiago, Chile. It is a pool type reactor using LEU MTR fuel assemblies, light water as moderator and coolant, and beryllium as reflector. The reactor has been operated at the nominal power of 5 MW in a continuous shift of 20 hours per week, 48 weeks per year. The main utilizations of the RECH-1 reactor are radioisotope production and neutron activation analysis. Among the most relevant refurbishment and modernization campaigns undertaken at the reactor are: full core conversion to the use of LEU fuel, replacement of the cooling tower, improvement of the containment building by changing the doors and gates and by a better sealant for the penetrations, introduction of an additional source of water by connecting the raw water supply system to the emergency cooling system, improvement of the emergency ventilation system, introduction of a fire detection and alarm system for detection and mitigation to protect the I&C racks, introduction of a radioactive liquid release for those generated at the reactor, introduction of a delay tank degasification system and renewal of the environmental monitoring system. At present we are assessing the possibility of replacing the old analog electronics of control for new digital systems. Detailed descriptions of these diverse activities are presented in the paper. (author)

  17. The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects

    Directory of Open Access Journals (Sweden)

    Mary Hardie

    2012-11-01

    Full Text Available Renovation and refurbishment of the existingcommercial building stock is a growing area oftotal construction activity and a significantgenerator of waste sent to landfill in Australia. Awritten waste management plan (WMP is awidespread regulatory requirement forcommercial office redevelopment projects. Thereis little evidence, however, that WMPs actuallyincrease the quantity of waste that is ultimatelydiverted from landfill. Some reports indicate anabsence of any formal verification or monitoringprocess by regulators to assess the efficacy ofthe plans. In order to gauge the extent of theproblem a survey was conducted of twenty fourconsultants and practitioners involved incommercial office building refurbishment projectsto determine the state of current practice withregard to WMPs and to elicit suggestions withregard to ways of making the process moreeffective. Considerable variation in commitmentto recycling policies was encountered indicatinga need to revisit waste minimisation practices ifthe environmental performance of refurbishmentprojects is to be improved.

  18. Recent results on cleaning and conditioning the ATF vacuum system

    International Nuclear Information System (INIS)

    Langley, R.A.; Clark, T.L.; Glowienka, J.C.

    1989-01-01

    Techniques for cleaning and conditioning the vacuum vessel of the Advanced Toroidal Facility (ATF) and its internal components are described. The vacuum vessel cleaning technique combines baking to 150/degree/C and glow discharges with hydrogen gas. Chromium gettering is used to further condition the system. The major internal components are the anodized aluminum baffles in the Thomson scattering system, a graphite-shielded ICRF antenna, two graphite limiters, and a diagnostic graphite plate. Three independent heating systems are used to bake some of the major components of the system. The major characteristics used for assessing cleanliness and conditioning progress are the maximum pressure attained during bakeout, the results of gas analysis, and relevant plasma parameters (e.g., time to radiative decay). Details of the various cleaning and conditioning procedures and results are presented. 5 refs., 8 figs., 3 tabs

  19. Vacuum-induced coherence in quantum dot systems

    Science.gov (United States)

    Sitek, Anna; Machnikowski, Paweł

    2012-11-01

    We present a theoretical study of vacuum-induced coherence in a pair of vertically stacked semiconductor quantum dots. The process consists in a coherent excitation transfer from a single-exciton state localized in one dot to a delocalized state in which the exciton occupation gets trapped. We study the influence of the factors characteristic of quantum dot systems (as opposed to natural atoms): energy mismatch, coupling between the single-exciton states localized in different dots, and different and nonparallel dipoles due to sub-band mixing, as well as coupling to phonons. We show that the destructive effect of the energy mismatch can be overcome by an appropriate interplay of the dipole moments and coupling between the dots which allows one to observe the trapping effect even in a structure with technologically realistic energy splitting of the order of milli-electron volts. We also analyze the impact of phonon dynamics on the occupation trapping and show that phonon effects are suppressed in a certain range of system parameters. This analysis shows that the vacuum-induced coherence effect and the associated long-living trapped excitonic population can be achieved in quantum dots.

  20. LHC vacuum system

    CERN Document Server

    Gröbner, Oswald

    1999-01-01

    The Large Hadron Collider (LHC) project, now in the advanced construction phase at CERN, comprises two proton storage rings with colliding beams of 7-TeV energy. The machine is housed in the existing LEP tunnel with a circumference of 26.7 km and requires a bending magnetic field of 8.4 T with 14-m long superconducting magnets. The beam vacuum chambers comprise the inner 'cold bore' walls of the magnets. These magnets operate at 1.9 K, and thus serve as very good cryo-pumps. In order to reduce the cryogenic power consumption, both the heat load from synchrotron radiation emitted by the proton beams and the resistive power dissipation by the beam image currents have to be absorbed on a 'beam screen', which operates between 5 and 20 K and is inserted inside the vacuum chamber. The design of this beam screen represents a technological challenge in view of the numerous and often conflicting requirements and the very tight mechanical tolerances imposed. The synchrotron radiation produces strong outgassing from the...

  1. Design and Construction of the NSTX Bakeout, Cooling and Vacuum Systems

    International Nuclear Information System (INIS)

    Dudek, L.E.; Kalish, M.; Gernhardt, R.; Parsells, R.F.; Blanchard, W.

    1999-01-01

    This paper will describe the design, construction and initial operation of the NSTX bakeout, water cooling and vacuum systems. The bakeout system is designed for two modes of operation. The first mode allows heating of the first wall components to 350 degrees C while the external vessel is cooled to 150 degrees C. The second mode cools the first wall to 150 degrees C and the external vessel to 50 degrees C. The system uses a low viscosity heat transfer oil which is capable of high temperature low pressure operation. The NSTX Torus Vacuum Pumping System (TVPS) is designed to achieve a base pressure of approximately 1x10 (superscript -8) Torr and to evacuate the plasma fuel gas loads in less than 5 minutes between discharges. The vacuum pumping system is capable of a pumping speed of approximately 3400 l/s for deuterium. The hardware consists of two turbo molecular pumps (TMPs) and a mechanical pump set consisting of a mechanical and a Roots blower pump. A PLC is used as the control system to provide remote monitoring, control and software interlock capability. The NSTX cooling water provides chilled, de ionized water for heat removal in the TF, OH and PF, power supplies, bus bar systems, and various diagnostics. The system provides flow monitoring via a PLC to prevent damage due to loss of flow

  2. Computer controlled vacuum control system for synchrotron radiation beam lines

    International Nuclear Information System (INIS)

    Goldberg, S.M.; Wang, C.; Yang, J.

    1983-01-01

    The increasing number and complexity of vacuum control systems at the Stanford Synchrotron Radiation Laboratory has resulted in the need to computerize its operations in order to lower costs and increase efficiency of operation. Status signals are transmitted through digital and analog serial data links which use microprocessors to monitor vacuum status continuously. Each microprocessor has a unique address and up to 256 can be connected to the host computer over a single RS232 data line. A FORTRAN program on the host computer will request status messages and send control messages via only one RS232 line per beam line, signal the operator when a fault condition occurs, take automatic corrective actions, warn of impending valve failure, and keep a running log of all changes in vacuum status for later recall. Wiring costs are thus greatly reduced and more status conditions can be monitored without adding excessively to the complexity of the system. Operators can then obtain status reports at various locations in the lab quickly without having to read a large number of meter and LED's

  3. Vacuum system of Synchrotron Light National Laboratory (LNLS) linear accelerator: project and results

    International Nuclear Information System (INIS)

    Rocha, L.R.B.; Gomes, P.A.P.

    1990-01-01

    The LINAC, electron linear accelerator used as injector for storage ring in production of synchrotron radiation at Laboratorio Nacional de Luz Sincrotron (LNLS) is described. The LINAC basic parameters, the dimension calculations of vacuum system and the final project with all components are presented. The vacuum system for electron gun tests and accelerator structure tests is described. (M.C.K.)

  4. Vacuum considerations: summary

    International Nuclear Information System (INIS)

    Blechschmidt, D.; Halama, H.J.

    1978-01-01

    A summary is given of the efforts of a vacuum systems study group of the workshop on a Heavy Ion Demonstration Experiment (HIDE) for heavy ion fusion. An inadequate knowledge of cross-sections prevents a more concrete vacuum system design. Experiments leading to trustworthy numbers for charge exchange, stripping and capture cross-sections are badly needed and should start as soon as possible. In linacs, beam loss will be almost directly proportional to the pressure inside the tanks. The tanks should, therefore, be built in such a way that they can be baked-out in situ to improve their vacuum, especially if the cross-sections turn out to be higher than anticipated. Using standard UHV techniques and existing pumps, an even lower pressure can be achieved. The vacuum system design for circular machines will be very difficult, and in some cases, beyond the present state-of-the-art

  5. Vacuum system for the LBL Advanced Light Source (ALS)

    International Nuclear Information System (INIS)

    Kennedy, K.; Henderson, T.; Meneghetti, J.

    1989-03-01

    A 1.5 to 1.9 GeV synchrotron light source is being built at LBL. The vacuum system is designed to permit most synchrotron photons to escape the electron channel and be absorbed in an antechamber. The gas generated by the photons hitting the absorbers in the antechambers will be pumped by titanium sublimation pumps located directly under the absorbers. The electron channel and the antechamber are connected by a 10-mm-high slot that offers good electrodynamic isolation of the two chambers of frequencies affecting the store electron orbit. Twelve 10-meter-long vessels constitute the vacuum chambers for all the lattice magnets. Each chamber will be machined from two thick plates of 5083-H321 aluminum and welded at the perimeter. Machining both the inside and outside of the vacuum chamber permits the use of complex and accurate surfaces. The use of thick plates allows flanges to be machined directly into the wall of each chamber, thus avoiding much welding. 1 ref., 3 figs

  6. Study of ITER equatorial port plug handling system and vacuum sealing interface

    Energy Technology Data Exchange (ETDEWEB)

    Martins, Jean-Pierre [Association Euratom CEA, CEA/DSM/IRFM, Cadarache, F-13108 Saint-Paul-lez-Durance (France)], E-mail: jean-pierre.martins@cea.fr; Doceul, Louis; Marol, Sebastien; Delchie, Elise [Association Euratom CEA, CEA/DSM/IRFM, Cadarache, F-13108 Saint-Paul-lez-Durance (France); Cordier, Jean-Jacques; Levesy, Bruno; Tesini, Alessandro [ITER International Organization, F-13108 Saint-Paul-lez-Durance cedex (France); Ciattaglia, Emanuela [EFDA CSU - Garching, Boltzmannstr. 2, D-85748 Garching (Germany); Tivey, Richard [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Gillier, Rene; Abbes, Christophe [GARLOCK - Sealing Technologies - 90, rue de la roche du Geai, F-42029 St-Etienne cedex 1 (France)

    2009-06-15

    In the field of the ITER port plug engineering and integration task, CEA has contributed to define proposals concerning the port plugs vacuum sealing interface with the vessel flange and the equatorial plug handling. The 2001 baseline vacuum flange sealing consisted of TIG welding of a 316L strip plate on to U shapes. This arrangement presented some issues like welding access, implementation of tools, lip consumption, complex local leak test, continuous leak checking. Therefore, an alternate sealing solution based on the use of metallic gaskets is proposed. The different technical aspects are discussed to explain how this design can simplify the maintenance and deal with safety and vacuum requirements. The design of the mechanical attachment and vacuum sealing of the plug has constantly evolved, but the associated remote handling equipment was not systematically reviewed. An update of the cask and maintenance procedure was studied in order to design it in accordance with the last generic plug flange design. This includes a concept of a gripping system that uses the plug flange bolting area and, to help the remote handling process, a cantilever assisting system is suggested to increase the reliability of the transfer operation between vacuum vessel and cask.

  7. Vacuum system for the Stanford-LBL storage ring (PEP)

    International Nuclear Information System (INIS)

    Bostic, D.; Cummings, U.; Dean, N.; Jeong, B.; Jurow, J.

    1975-03-01

    The vacuum system for PEP will be similar in design, construction and operation to the system currently in operation at SPEAR. There will, of course, be quantitative differences since the closed path of PEP will be 10 times longer than the SPEAR path. Some qualitative differences will also arise since the radiated synchrotron power for PEP will be about 13 times greater than for SPEAR giving rise to an increased linear power density incident on the chamber wall. Other differences arise from the higher energy spectrum of the synchrotron radiation. The SPEAR vacuum system has been in operation since April 1972 and has proven satisfactory in design, construction and operation. The chamber has been subject to synchrotron radiation for approximately 300 ampere-hours and beam lifetimes are now more than several hours. The details of the PEP design and the SPEAR operating experience will be further discussed in this paper. 1 ref., 4 figs

  8. TMX-Upgrade vacuum-system design and analysis

    International Nuclear Information System (INIS)

    Simonen, T.C.; Chargin, A.K.; Drake, R.P.; Nexsen, W.E.; Pickles, W.L.; Poulsen, P.; Stack, T.P.; Wong, R.L.

    1981-10-01

    This paper describes the design and analysis of the TMX Upgrade Vacuum System. TMX Upgrade is a modification of the TMX tandem mirror device. It will employ thermal barriers to further improve plasma confinement. Thermal barriers are produced by microwave heating and neutral-beam pumping. They increase the feasibility of tandem-mirror reactors by reducing both the required magnetic field strengths and the neutral-beam injection voltages

  9. Relaxed plasma-vacuum systems

    International Nuclear Information System (INIS)

    Spies, G.O.; Lortz, D.; Kaiser, R.

    2001-01-01

    Taylor's theory of relaxed toroidal plasmas (states of lowest energy with fixed total magnetic helicity) is extended to include a vacuum between the plasma and the wall. In the extended variational problem, one prescribes, in addition to the helicity and the magnetic fluxes whose conservation follows from the perfect conductivity of the wall, the fluxes whose conservation follows from the assumption that the plasma-vacuum interface is also perfectly conducting (if the wall is a magnetic surface, then one has the toroidal and the poloidal flux in the vacuum). Vanishing of the first energy variation implies a pressureless free-boundary magnetohydrostatic equilibrium with a Beltrami magnetic field in the plasma, and in general with a surface current in the interface. Positivity of the second variation implies that the equilibrium is stable according to ideal magnetohydrodynamics, that it is a relaxed state according to Taylor's theory if the interface is replaced by a wall, and that the surface current is nonzero (at least if there are no closed magnetic field lines in the interface). The plane slab, with suitable boundary conditions to simulate a genuine torus, is investigated in detail. The relaxed state has the same double symmetry as the vessel if, and only if, the prescribed helicity is in an interval that depends on the prescribed fluxes. This interval is determined in the limit of a thin slab

  10. The vacuum system reform and test of the super-critical 600mw unit

    Science.gov (United States)

    Yan, Tao; Wan, Zhonghai; Lu, Jin; Chen, Wen; Cai, Wen

    2017-11-01

    The deficiencies of the designed vacuum system of the super-critical unit is pointed out in this paper, and then it is reformed by the steam ejector. The experimental results show that the vacuum of the condenser can be improved, the coal consumption can be reduced and the plant electricity consumption can be lowered dramatically at a small cost of the steam energy consumption. Meanwhile, the water-ring vacuum pumps cavitation problems can be solved.

  11. Building performance simulation as a design tool for refurbishment of buildings

    NARCIS (Netherlands)

    Hensen, J.L.M.; Bartak, M.; Drkal, F.; Dunovska, T.; Lain, M.; Matuska, T.; Schwarzer, J.; Sourek, B.; Bednar, T.

    2004-01-01

    This paper attempts to outline the current state-of-the-art regarding the use of building performance simulation as a design tool for refurbishment of buildings. This is illus-trated by means of three recent studies for conversion of historical buildings (an early 20th century factory, and a water

  12. A scheme of measurement of quantum-vacuum geometric phases in a noncoplanar fibre system

    International Nuclear Information System (INIS)

    Shen Jianqi

    2004-01-01

    We study the quantum-vacuum geometric phases resulting from the vacuum fluctuation of photon fields in a Tomita-Chiao-Wu noncoplanar curved fibre system, and suggest a scheme to test for the potential existence of such a vacuum effect. Since the signs of the quantum-vacuum geometric phases of left- and right-handed (LRH) circularly polarized light are opposite, the sum of the geometric phases at the vacuum level is necessarily zero in the fibre experiments performed previously by other authors. By using the present approach where a fibre made of gyroelectric media is employed, the quantum-vacuum geometric phases of LRH light cannot be exactly cancelled, and it may therefore be possible to test this experimentally. (letter to the editor)

  13. Design of the vacuum control system for DIII-D

    International Nuclear Information System (INIS)

    Campbell, G.L.; Callis, R.W.; Haskovec, J.S.; Heckman, E.J.; Moore, C.D.; Scoville, J.T.

    1986-01-01

    The vacuum control and instrumentation for the DIII-D upgrade was designed using a new large programmable controller with color graphic operator interfaces and intelligent distributed devices. Remote, optically isolated input and output is used as well as optical isolation for the operator and programming consoles. Gate valves between experimental equipment and the vacuum vessel are interlocked for machine safety by an intelligent interface based upon a commercially available microcontroller card. Complete automatic operation with capability for remote operator intervention was one goal of this design effort. The design of the system with emphasis on the graphics, optical isolation and microcontroller implementation will be discussed

  14. Thermal System Upgrade of the Space Environment Simulation Test Chamber

    Science.gov (United States)

    Desai, Ashok B.

    1997-01-01

    The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.

  15. Technological plasma source equipped with combined system of vacuum-arc discharge initiation

    International Nuclear Information System (INIS)

    Sysoev, Yu.O.

    2013-01-01

    The construction and the operation principle of erosion plasma source with a three-stage system of vacuum-arc discharge excitation is described. As first two step was used the modified contactless start system with plasma injector, which was widely used in standard plasma sources of the ''Bulat'' systems. The operation principle of the third stage was based on the transition of glow discharge to arc discharge. Coordinated operation of three stages during various stages of coating deposition provided significant increasing of service life and reliability of the system of vacuum-arc discharge initiation and extended the functionality of the plasma source

  16. Main refurbishment activities on electronic and electrical equipment for the FRG-1 research reactor

    International Nuclear Information System (INIS)

    Blom, K.H.; Krull, W.

    1997-01-01

    As GKSS intends to operate the research reactor FRG-1 safely and reliably for many years to come, the plant is constantly refurbished and upgraded both in the interests of safety and operational reasons. The following electronic and electrical systems have been replaced or improved since 1990: Information and signalling systems; Emergency power plant (permit applied for); External and internal lightning protection system; Reactor protection system (in part); Safety lighting; Alarm and staff locating system; Control room telephone system; Closed-circuit television system; Beam tube controls; Storage plant for radioactive liquid waste; Ambient dose rate measuring system; Meteorological measuring system; Control and measuring system for the primary cooling circuit; Control rod drives; Control rod control system; Soft start for the secondary pumps; Control and switching devices for the emergency power plant; Trailing cable installation for the reactor bridge; Main-voltage distribution systems/cable routes. (author). 13 figs, 1 tab

  17. Nitrogen pressure in a vacuum system

    International Nuclear Information System (INIS)

    Edwards, D. Jr.

    1977-01-01

    Since the N 2 outgassing rate from walls of a vacuum system is generally recognized to be very small, the presence of a N 2 pressure in the system is a useful indication of the presence of real leaks to the atmosphere. A technique of thermal desorption mass spectrometry is introduced which allows the N 2 pressure in the background gas of a baked system to be separated from a CH 4 background to a minimum level of N 2 detectability of approximately 1 percent of the CO background pressure. In typical baked systems (of which an example is given), it is possible to readily determine the sum of all real N 2 leaks to atmosphere at a level of approximately 10 -11 Torr liter/s. This feature makes the technique ideally suited to large complex systems since the leak rate can be evaluated before detailed leak finding procedures are initiated

  18. Was It Really Worth Pain? Refurbishment of Mercedes-Benz Trucks by Botswana Defence Force

    National Research Council Canada - National Science Library

    Rangobana, Samuel A; Alkebaisi, Hussain K

    2005-01-01

    .... Logistics statistics, for refurbished trucks returned to user units, are also gathered from the asset management software database, Mincom Ellipse, in use by the Botswana Defence Force Mechanical...

  19. Cold Vacuum Drying Facility Crane and Hoist System Design Description. System 14

    International Nuclear Information System (INIS)

    TRAN, Y.S.

    2000-01-01

    This system design description (SDD) is for the Cold Vacuum Drying (CVD) Facility overhead crane and hoist system. The overhead crane and hoist system is a general service system. It is located in the process bays of the CVD Facility, supports the processes required to drain the water and dry the spent nuclear fuel (SNF) contained in the multi-canister overpacks (MCOs) after they have been removed from the K-Basins. The location of the system in the process bay is shown

  20. Tests of a vacuum breaker for the FTU commutation system

    International Nuclear Information System (INIS)

    Andreani, R.; Lovisetto, L.; Cornago, F.

    1984-01-01

    A two poles vacuum breaker, equipped with saturable inductances and capacitor banks to produce an artificial current zero, appears the most suitable solution to satisfy these requirements with high reliability of operation and limited maintenance. Two series of tests have been conducted to evaluate the performance and reliability of the system and in particular the erosion of the electrodes as a function of number of operations. The test results have been very satisfactory. At least 1000 full power pulses can be envisaged before replacing the vacuum bottles. (author)

  1. The effectiveness of environment assessment tools to guide refurbishment of Australian residential aged care facilities: A systematic review.

    Science.gov (United States)

    Neylon, Samantha; Bulsara, Caroline; Hill, Anne-Marie

    2017-06-01

    To determine applicability of environment assessment tools in guiding minor refurbishments of Australian residential aged care facilities. Studies conducted in residential aged care settings using assessment tools which address the physical environment were eligible for inclusion in a systematic review. Given these studies are limited, tools which have not yet been utilised in research settings were also included. Tools were analysed using a critical appraisal screen. Forty-three publications met the inclusion criteria. Ten environment assessment tools were identified, of which four addressed all seven minor refurbishment domains of lighting, colour and contrast, sound, flooring, furniture, signage and way finding. Only one had undergone reliability and validity testing. There are four tools which may be suitable to use for minor refurbishment of Australian residential aged care facilities. Data on their reliability, validity and quality are limited. © 2017 AJA Inc.

  2. Development of vacuum brazing furnace

    International Nuclear Information System (INIS)

    Singh, Rajvir; Yedle, Kamlesh; Jain, A.K.

    2005-01-01

    In joining of components where welding process is not possible brazing processes are employed. Value added components, high quality RF systems, UHV components of high energy accelerators, carbide tools etc. are produced using different types of brazing methods. Furnace brazing under vacuum atmosphere is the most popular and well accepted method for production of the above mentioned components and systems. For carrying out vacuum brazing successfully it is essential to have a vacuum brazing furnace with latest features of modern vacuum brazing technology. A vacuum brazing furnace has been developed and installed for carrying out brazing of components of copper, stainless steel and components made of dissimilar metals/materials. The above furnace has been designed to accommodate jobs of 700mm diameter x 2000mm long sizes with job weight of 500kgs up to a maximum temperature of 1250 degC at a vacuum of 5 x 10 -5 Torr. Oil diffusion pumping system with a combination of rotary and mechanical booster pump have been employed for obtaining vacuum. Molybdenum heating elements, radiation shield of molybdenum and Stainless Steel Grade 304 have been used. The above furnace is computer controlled with manual over ride facility. PLC and Pentium PC are integrated together to maneuver steps of operation and safety interlocks of the system. Closed loop water supply provides cooling to the system. The installation of the above system is in final stage of completion and it will be ready for use in next few months time. This paper presents insights of design and fabrication of a modern vacuum brazing furnace and its sub-system. (author)

  3. Vacuum fused deposition modelling system to improve tensile ...

    African Journals Online (AJOL)

    In the printing process, the interlayer bonding is made too quick thus the layers are not fully fused together causing the reduced tensile strength. This paper presents a possible solution to this problem by incorporating vacuum technology in FDM system to improve tensile strength of 3D printed specimens. In this study, a ...

  4. Refurbishment of a Victorian terraced house for energy efficiency

    Science.gov (United States)

    Dimitriou, Angeliki

    The impacts of global warming are now obvious. The international community has committed itself to reduce CO2 emissions, the main contributor to the greenhouse effect, both at international and national levels. In the Kyoto Protocol signed in 1997, countries have committed to reduce their greenhouse gases emissions below their 1990 levels by the period 2008-2012. The UK specifically should reduce those emissions by 12.5%. Format reason, the UK has introduced a package of policies, which promote not only the use of renewable energy resources, but most importantly the reduction in energy use, with energy efficiency. Refurbishment of existing houses has and will contribute to the reduction of energy consumption. A Victorian mid-terraced house was studied in this report, and different refurbishment measures were tested, using two software programmes: TAS and SAP. The targets were to achieve certain levels of thermal comfort, to comply with the Building Regulation for building thermal elements and to achieve a high SAP rating. Then, the cost of each measure was calculated and its CO2 emissions were compared. Heat losses were mainly through the walls and roof. Roof and mainly wall refurbishment measures reduce the heating loads the most. Ground floor insulation does not contribute to the reduction of the heating loads, on the contrary it has detrimental effect in summer, where the cooling effect coming from the ground is being reduced. Window replacement achieves a very good performance in summer resulting in the reduction of overheating. Wall and roof insulation increase the SAP rating the most, between the building elements, but boiler replacement and upgrading of heating controls increase it more. According to the SAP rating, CO2 annual emissions are reduced the most by boiler replacement and then by wall and roof. The results given by the two softwares concerning which measure is more leads more to energy efficiency, are the same. Finally, if the measures which lead

  5. Pressure measurements in the AGS Booster ultra-high vacuum system

    International Nuclear Information System (INIS)

    Gabusi, J.; Geller, J.; Hseuh, H.C.; Mapes, M.; Stattel, P.

    1992-01-01

    An average pressure of mid 10 -11 Torr has been achieved and maintained in the AGS Booster ring vacuum system during its first year of operation. This ultra-high vacuum system is monitored through remote controlled Bayard-Alpert Gauges (BAGs). The characteristics of the pressure measurements with BAGs over the long cable lengths (up to 200 m) and under various accelerator operating conditions will be described. Two types of noise in the pressure readouts have been identified; the electromagnetic interference (EMI) associated with the acceleration cycles of the Booster and the environment noise associated with the temperature of the collector cables. The magnitude of the noise pickup depends on the routing of the collector cables and reaches the equivalent pressure of low 10 -9 Torr

  6. Safety Analysis in Large Volume Vacuum Systems Like Tokamak: Experiments and Numerical Simulation to Analyze Vacuum Ruptures Consequences

    Directory of Open Access Journals (Sweden)

    A. Malizia

    2014-01-01

    Full Text Available The large volume vacuum systems are used in many industrial operations and research laboratories. Accidents in these systems should have a relevant economical and safety impact. A loss of vacuum accident (LOVA due to a failure of the main vacuum vessel can result in a fast pressurization of the vessel and consequent mobilization dispersion of hazardous internal material through the braches. It is clear that the influence of flow fields, consequence of accidents like LOVA, on dust resuspension is a key safety issue. In order to develop this analysis an experimental facility is been developed: STARDUST. This last facility has been used to improve the knowledge about LOVA to replicate a condition more similar to appropriate operative condition like to kamaks. By the experimental data the boundary conditions have been extrapolated to give the proper input for the 2D thermofluid-dynamics numerical simulations, developed by the commercial CFD numerical code. The benchmark of numerical simulation results with the experimental ones has been used to validate and tune the 2D thermofluid-dynamics numerical model that has been developed by the authors to replicate the LOVA conditions inside STARDUST. In present work, the facility, materials, numerical model, and relevant results will be presented.

  7. Insulation vacuum and beam vacuum overpressure release

    CERN Document Server

    Parma, V

    2009-01-01

    There is evidence that the incident of 19th September caused a high pressure build-up inside the cryostat insulation vacuum which the existing overpressure devices could not contain. As a result, high longitudinal forces acting on the insulation vacuum barriers developed and broke the floor and the floor fixations of the SSS with vacuum barriers. The consequent large longitudinal displacements of the SSS damaged chains of adjacent dipole cryo-magnets. Estimates of the helium mass flow and the pressure build- up experienced in the incident are presented together with the pressure build-up for an even more hazardous event, the Maximum Credible Incident (MCI). The strategy of limiting the maximum pressure by the installation of addition pressure relieve devices is presented and discussed. Both beam vacuum lines were ruptured during the incident in sector 3-4 giving rise to both mechanical damage and pollution of the system. The sequence, causes and effects of this damage will be briefly reviewed. We will then an...

  8. Vacuum system of tandem type electrostatic accelerator of Kyushu University

    International Nuclear Information System (INIS)

    Nakajima, Yutaka

    1981-01-01

    In the tandem type electrostatic accelerator of Kyushu University, the problem of vacuum in the beam transport system including the accelerator tube has been considered as one of the important elements for the performance of the electrostatic accelerator from the beginning of construction. Though the three-stage tandem accelerating scheme was considered as the beam transport system at the beginning of the program, in which the existing 6 MV Van de Graaf accelerator was to be used as the injector, three types of ion sources are prepared at present; the sputter ion source to generate negative heavy ions, the polarizing ion source to generate negative polarized protons or deuterons, and direct extraction type negative ion source. Ultrahigh evacuating system, in which the sputter ion pump is mainly employed, and the turbo-molecular pump is used supplementarily, was installed in the vacuum system. The vacuum of approximately 10 - 9 Torr level off-beam at the inlet or outlet of the accelerator tube and approximately 10 - 8 Torr level in the tubing section in the center terminal were achieved. Since the upper limit of withstand voltage of the accelerating tube was not able to be satisfied for the insufficient baking at the beginning, it was finally decided that the accelerating tube should be heated by directly supplying power to the electrode through low voltage discharge in the tube. This method enabled the generated voltage at the terminal to exceed 10 MV. (Wakatsuki, Y.)

  9. Night vision imaging system design, integration and verification in spacecraft vacuum thermal test

    Science.gov (United States)

    Shang, Yonghong; Wang, Jing; Gong, Zhe; Li, Xiyuan; Pei, Yifei; Bai, Tingzhu; Zhen, Haijing

    2015-08-01

    The purposes of spacecraft vacuum thermal test are to characterize the thermal control systems of the spacecraft and its component in its cruise configuration and to allow for early retirement of risks associated with mission-specific and novel thermal designs. The orbit heat flux is simulating by infrared lamp, infrared cage or electric heater. As infrared cage and electric heater do not emit visible light, or infrared lamp just emits limited visible light test, ordinary camera could not operate due to low luminous density in test. Moreover, some special instruments such as satellite-borne infrared sensors are sensitive to visible light and it couldn't compensate light during test. For improving the ability of fine monitoring on spacecraft and exhibition of test progress in condition of ultra-low luminous density, night vision imaging system is designed and integrated by BISEE. System is consist of high-gain image intensifier ICCD camera, assistant luminance system, glare protect system, thermal control system and computer control system. The multi-frame accumulation target detect technology is adopted for high quality image recognition in captive test. Optical system, mechanical system and electrical system are designed and integrated highly adaptable to vacuum environment. Molybdenum/Polyimide thin film electrical heater controls the temperature of ICCD camera. The results of performance validation test shown that system could operate under vacuum thermal environment of 1.33×10-3Pa vacuum degree and 100K shroud temperature in the space environment simulator, and its working temperature is maintains at 5° during two-day test. The night vision imaging system could obtain video quality of 60lp/mm resolving power.

  10. Spent nuclear fuel project cold vacuum drying facility process water conditioning system design description

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    1998-01-01

    This document provides the System Design Description (SDD) for the Cold Vacuum Drying Facility (CVDF) Process Water Conditioning (PWC) System. The SDD was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998), the HNF-SD-SNF-DRD-O02, 1998, Cold Vacuum Drying Facility Design Requirements, and the CVDF Design Summary Report. The SDD contains general descriptions of the PWC equipment, the system functions, requirements and interfaces. The SDD provides references for design and fabrication details, operation sequences and maintenance. This SDD has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  11. Vacuum Bellows, Vacuum Piping, Cryogenic Break, and Copper Joint Failure Rate Estimates for ITER Design Use

    Energy Technology Data Exchange (ETDEWEB)

    L. C. Cadwallader

    2010-06-01

    The ITER international project design teams are working to produce an engineering design in preparation for construction of the International Thermonuclear Experimental Reactor (ITER) tokamak. During the course of this work, questions have arisen in regard to safety barriers and equipment reliability as important facets of system design. The vacuum system designers have asked several questions about the reliability of vacuum bellows and vacuum piping. The vessel design team has asked about the reliability of electrical breaks and copper-copper joints used in cryogenic piping. Research into operating experiences of similar equipment has been performed to determine representative failure rates for these components. The following chapters give the research results and the findings for vacuum system bellows, power plant stainless steel piping (amended to represent vacuum system piping), cryogenic system electrical insulating breaks, and copper joints.

  12. Vacuum system of the compact Energy Recovery Linac

    Energy Technology Data Exchange (ETDEWEB)

    Honda, T., E-mail: tohru.honda@kek.jp; Tanimoto, Y.; Nogami, T.; Takai, R.; Obina, T.; Asaoka, S.; Uchiyama, T.; Nakamura, N. [High Energy Accelerator Research Organization (KEK) (1-1 Oho, Tsukuba, Ibaraki 305-0801, Japan) (Japan)

    2016-07-27

    The compact Energy Recovery Linac (cERL), a test accelerator to establish important technologies demanded for future ERL-based light sources, was constructed in late 2013 at KEK. The accelerator was successfully commissioned in early 2014, and demonstrated beam circulation with energy recovery. In the cERL vacuum system, low-impedance vacuum components are required to circulate high-intensity, low-emittance and short-bunch electron beams. We therefore developed ultra-high-vacuum (UHV)-compatible flanges that can connect beam tubes seamlessly, and employed retractable beam monitors, namely, a movable Faraday cup and screen monitors. In most parts of the accelerator, pressures below 1×10{sup −7} Pa are required to mitigate beam-gas interactions. Particularly, near the photocathode electron gun and the superconducting (SC) cavities, pressures below 1×10{sup −8} Pa are required. The beam tubes in the sections adjoining the SC cavities were coated with non-evaporable getter (NEG) materials, to reduce gas condensation on the cryo-surfaces. During the accelerator commissioning, stray magnetic fields from the permanent magnets of some cold cathode gauges (CCGs) were identified as a source of the disturbance to the beam orbit. Magnetic shielding was specially designed as a remedy for this issue.

  13. Vacuum mechatronic laser alignment system on the Nova laser

    International Nuclear Information System (INIS)

    Holliday, M.; Wong, K.; Shelton, R.

    1991-11-01

    The experiments conducted on NOVA are done to investigate inertially confined laser fusion reactions. To this end, the ten beams of the laser are aligned to within 30mm. The target chamber employs a vacuum mechatronic based reticle/target positioning system to accomplish this. It is a five degree-of-freedom chamber resident system, known as the Alignment Aids Positioner or AAP. The AAP aids in beam and diagnostic alignment by accurately positioning a reticle at target chamber center to with 7mm. The AAP system increases target positioning and alignment flexibility and accuracy through the use of a computer controlled multi degree-of-freedom stage assembly. This device uses microstepping DC stepper motors with encoders to achieve closed loop control in a 10 -6 torr vacuum. The AAP has two positioning regimes to move the alignment reticle and do beam alignment. One is course positioning in the Y-Z plane that moves a high resolution stage assembly to target chamber center. The other regime is high resolution movement in the X,Y,Z and q directions. 5 refs., 9 figs

  14. Automated System for Control of the Vacuum Diagnostic System for the TJ-II

    International Nuclear Information System (INIS)

    Lopez Sanchez, A.; Montoro Peinado, A.; Encabo Fernandez, J.; Gama de la Serrano, J.; Sanchez Sarabia, E.

    1999-12-01

    This report describes the monitoring and remote control systems belonging to the high vacuum systems of the TJ-II diagnostics. These systems are part of each diagnostic and their control has been integrated into the automata that carries out this task. All the controllers are connected through a Profibus network, so as to interchange data between themselves as well as between the general system of TJ-II. (Author)

  15. Vacuum Mechatronics And Insvection For Self-Contained Manufacturing

    Science.gov (United States)

    Belinski, Steve E.; Shirazi, Majid; Seidel, Thomas E.; Hackwood, Susan

    1990-02-01

    The vacuum environment is increasingly being used in manufacturing operations, especially in the semiconductor industry. Shrinking linewidths and feature sizes dictate that cleanliness standards become continually more strict. Studies at the Center for Robotic Systems in Microelectronics (CRSM) indicate that a controlled vacuum enclosure can provide a superior clean environment. In addition, since many microelectronic fabrication steps are already carried out under vacuum, self-contained multichamber processing systems are being developed at a rapid pace. CRSM support of these systems includes the development of a research system, the Self-contained Automated Robotic Factory (SCARF), a vacuum-compatible robot, and investigations of particulate characterization in vacuum and inspection for multichamber systems. Successful development of complex and expensive multichamber systems is, to a great extent, dependent upon the discipline called vacuum mechatronics, which includes the design and development of vacuum-compatible computer-controlled mechanisms for manipulating, sensing and testing in a vacuum environment. Here the constituents of the vacuum mechatronics discipline are defined and reviewed in the context of the importance to self-contained in-vacuum manufacturing.

  16. Cold Vacuum Drying facility deionized water system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) de-ionized water system. The de-ionized water system is used to provide clean, conditioned water, free from contaminants, chlorides and iron for the CVD Facility. Potable water is supplied to the deionized water system, isolated by a backflow prevention device. After the de-ionization process is complete, via a packaged de-ionization unit, de-ionized water is supplied to the process deionization unit

  17. CAS CERN Accelerator School vacuum technology. Proceedings

    International Nuclear Information System (INIS)

    Turner, S.

    1999-01-01

    These proceedings present the lectures given at the twelfth specialized course organized by the CERN Accelerator School (CAS), the topic this time being 'Vacuum Technology'. Despite the importance of vacuum technology in the design and operation of particle accelerators at CERN and at the many other accelerators already installed around the world, this was the first time that CAS has organized a course devoted entirely to this topic. Perhaps this reflects the facts that vacuum has become one of the more critical aspects of future accelerators, and that many of the pioneers in the accelerator field are being replaced by new, younger personnel. The lectures start with the basic concepts of the physics and technology of vacuum followed by detailed descriptions of the many different types of gas-pumping devices and methods to measure the pressures achieved. The outgassing characteristics of the different materials used in the construction of vacuum systems and the optimisation of cleaning methods to reduce this outgassing are then explained together with the effects of the residual gases on the particle beams. Then follow chapters on leak detection, materials and vacuum system engineering. Finally, seminars are presented on designing vacuum systems, the history of vacuum devices, the LHC (large hadron collider) vacuum system, vacuum systems for electron storage rings, and quality assurance for vacuum. (orig.)

  18. Operational characteristics of VEC vacuum system

    International Nuclear Information System (INIS)

    Viswanadham, C.; Bhavsar, S.T.; Bose, D.K.; Chintalapudi, S.N.; Das, S.K.; Tiwary, S.D.

    1979-01-01

    The main vacuum system of the Variable Energy Cyclotron which has been built indigenously has fulfilled the requirements for the smooth operation of the machine. By running two 88.9 cm diffusion pumps with freon cooled baffles and backed by 600 l/m rotary pumps, a pressure of 5 x 10 -6 torr in absence of the beam and 1 x 10 -5 torr in presence of the beam is readily achieved in the 23 m 3 volume. Various means have been adopted to maintain the system in order and contamination-free, by maintaining a pressure level of 1 x 10 -4 torr throughout the working week by a 30 cm diffusion pump, which can run even on emergency power. Cryopanels have also been installed and tried out. Details of pump-down characteristics and system performance are discussed. (auth.)

  19. Analytical solutions for a single vertical drain with time-dependent vacuum combined surcharge preloading in membrane and membraneless systems

    International Nuclear Information System (INIS)

    Geng, X Y; Indraratna, B; Rujikiatkamjorn, C

    2010-01-01

    Vertical drains combined with vacuum pressure and surcharge preloading are widely used to accelerate the consolidation process of soft clay in order to decrease the pore pressure as well as to increase the effective stress. Currently there are two types of vacuum preloading systems commercially available; (a) membrane system with an airtight membrane over the drainage layer and, (b) membraneless system where a vacuum system is connected to individual drain. Their effectiveness varies from site to site depending on the type of soil treated and the characteristics of the drain-vacuum system. This study presents the analytical solutions of vertical drains with vacuum preloading for both membrane and membraneless systems. According to the field and laboratory observations, the vacuum in both of the membraneless and membrane system was assumed to be decreasing along the drain whereas in the membrane system, it was maintained at a constant level. This model was verified by using the measured settlements and excess pore pressures obtained from large-scale laboratory testing and case studies in Australia. The analytical solutions improved the accuracy of predicting the dissipation of pore water pressure and the associated settlement. The effects of the permeability of the sand blanket in a membrane system and the possible loss of vacuum were also discussed.

  20. Accelerator vacuum system elements

    International Nuclear Information System (INIS)

    Sivokon', V.V.; Kobets, A.F.; Shvetsov, V.A.; Sivokon', L.V.

    1980-01-01

    Some elements of vacuum systems are investigated. Considerable attention has been given to the investigation into peculiarities in pumping out of a ionoguide for transportation of an accelerated charged particles beam the spread of which often attains a considerable length. The number of pumps over the ionoguide length is experimentally determined. It is shown that as a result of ionoguide warm-up the pumping out time is considerably reduced maximum permissible pressure is decreased by two orders and lesser rate of pump pumping out is required. The investigations have shown that when operating the ionoguide there is no necessity in setting up seals between the ionoguide and magnetodischarged pump. The causes of the phenomenon in which the pressure near the pump is greater than in the end of the ionoguide, are impurities carried in by the pump into the ionoguide volume and the pumping out capacity of the pressure converter

  1. 21 CFR 864.9125 - Vacuum-assisted blood collection system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Vacuum-assisted blood collection system. 864.9125 Section 864.9125 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES HEMATOLOGY AND PATHOLOGY DEVICES Products Used In Establishments That Manufacture...

  2. Large vacuum system for experiences in magnetic confined plasmas

    International Nuclear Information System (INIS)

    Honda, R.Y.; Kayama, M.E.; Boeckelmann, H.K.; Aihara, S.

    1984-01-01

    It is presented the operation method of a theta-pinch system capable of generating and confine plasmas with high densities and temperatures. Some characteristics of Tupa theta-pinch, which is operating at UNICAMP, emphasizing the cleaning mode of the vacuum chamber, are also presented. (M.C.K.) [pt

  3. Space Suit Portable Life Support System (PLSS) 2.0 Unmanned Vacuum Environment Testing

    Science.gov (United States)

    Watts, Carly; Vogel, Matthew

    2016-01-01

    For the first time in more than 30 years, an advanced space suit Portable Life Support System (PLSS) design was operated inside a vacuum chamber representative of the flight operating environment. The test article, PLSS 2.0, was the second system-level integrated prototype of the advanced PLSS design, following the PLSS 1.0 Breadboard that was developed and tested throughout 2011. Whereas PLSS 1.0 included five technology development components with the balance the system simulated using commercial-off-the-shelf items, PLSS 2.0 featured first generation or later prototypes for all components less instrumentation, tubing and fittings. Developed throughout 2012, PLSS 2.0 was the first attempt to package the system into a flight-like representative volume. PLSS 2.0 testing included an extensive functional evaluation known as Pre-Installation Acceptance (PIA) testing, Human-in-the-Loop testing in which the PLSS 2.0 prototype was integrated via umbilicals to a manned prototype space suit for 19 two-hour simulated EVAs, and unmanned vacuum environment testing. Unmanned vacuum environment testing took place from 1/9/15-7/9/15 with PLSS 2.0 located inside a vacuum chamber. Test sequences included performance mapping of several components, carbon dioxide removal evaluations at simulated intravehicular activity (IVA) conditions, a regulator pressure schedule assessment, and culminated with 25 simulated extravehicular activities (EVAs). During the unmanned vacuum environment test series, PLSS 2.0 accumulated 378 hours of integrated testing including 291 hours of operation in a vacuum environment and 199 hours of simulated EVA time. The PLSS prototype performed nominally throughout the test series, with two notable exceptions including a pump failure and a Spacesuit Water Membrane Evaporator (SWME) leak, for which post-test failure investigations were performed. In addition to generating an extensive database of PLSS 2.0 performance data, achievements included requirements and

  4. LLNL Tandem Mirror Experiment (TMX) upgrade vacuum system

    International Nuclear Information System (INIS)

    Pickles, W.L.; Chargin, A.K.; Drake, R.P.

    1981-01-01

    TMX Upgrade is a large, tandem, magnetic-mirror fusion experiment with stringent requirements on base pressure (10 -8 torr), low H reflux from the first walls, and peak gas pressure (5 x 10 -7 torr) due to neutral beam gas during plasma operation. The 225 m 3 vacuum vessel is initially evacuated by turbopumps. Cryopumps provide a continuous sink for gases other than helium, deuterium, and hydrogen. The neutral beam system introduces up to 480 l/s of H or D. The hydrogen isotopes are pumped at very high speed by titanium sublimed onto two cylindrical radially separated stainless steel quilted liners with a total surface area of 540 m 2 . These surfaces (when cooled to about 80 0 K) provide a pumping speed of 6 x 10 7 l/s for hydrogen. The titanium getter system is programmable and is used for heating as well as gettering. The inner plasma liner can be operated at elevated temperatures to enhance migration of gases away from the surfaces close to the plasma. Glow discharge cleaning is part of the pumpdown procedure. The design features are discussed in conjunction with the operating procedures developed to manage the dynamic vacuum conditions

  5. Vacuum status-display and sector-conditioning programs

    International Nuclear Information System (INIS)

    Skelly, J.; Yen, S.

    1989-01-01

    Two programs have been developed for observation and control of the AGS vacuum system, which include these notable features: they incorporate a graphical user interface, and they are driven by a relational database which describes the vacuum system. The vacuum system comprises some 440 devices organized into 28 vacuum sectors. The Status Display Program invites menu selection of a sector, interrogates the relational database for relevant vacuum devices, acquires live readbacks, and posts a graphical display of their status. The Sector Conditioning Program likewise invites sector selection, produces the same status display, and also implements process control logic on the sector devices to pump the sector down from atmospheric pressure to high vacuum over a period extending for several hours. As additional devices are installed in the vacuum system, the devices are likewise added to the relational database; these programs then automatically include the new devices. 2 refs., 1 fig

  6. Research reactor modernization and refurbishment

    International Nuclear Information System (INIS)

    2009-08-01

    Many recent, high profile research reactor unplanned shutdowns can be directly linked to different challenges which have evolved over time. The concept of ageing management is certainly nothing new to nuclear facilities, however, these events are highlighting the direct impact unplanned shutdowns at research reactors have on various stakeholders who depend on research reactor goods and services. Provided the demand for these goods and services remains strong, large capital projects are anticipated to continue in order to sustain future operation of many research reactors. It is within this context that the IAEA organized a Technical Workshop to launch a broader Agency activity on research reactor modernization and refurbishment (M and R). The workshop was hosted by the operating organization of the HOR Research Reactor in Delft, the Netherlands, in October 2006. Forty participants from twenty-three countries participated in the meeting: with representation from Africa, Asia Pacific, Eastern Europe, North America, South America and Western Europe. The specific objectives of this workshop were to present facility reports on completed, existing and planned M and R projects, including the project objectives, scope and main characteristics; and to specifically report on: - the project impact (planned or actual) on the primary and key supporting motivation for the M and R project; - the project impact (planned or actual) on the design basis, safety, and/or regulatory-related reports; - the project impact (planned or actual) on facility utilization; - significant lessons learned during or following the completion of M and R work. Contributions from this workshop were reviewed by experts during a consultancy meeting held in Vienna in December 2007. The experts selected final contributions for inclusion in this report. Requests were also distributed to some authors for additional detail as well as new authors for known projects not submitted during the initial 2006 workshop

  7. Continuous fed-batch vacuum fermentation system for glycerol from molasses by the sulfite process

    Energy Technology Data Exchange (ETDEWEB)

    Kalle, G.P.; Naik, S.C.

    1985-01-01

    A continuous fed-batch vacuum fermentation system has been described for the production of glycerol from cane molasses (and juice) by a conventional sulfite process. A glycerol concentration of 80 g/l was achieved with a productivity of 30 g/l/day at a dilution rate of 0.4/day which is twice that from a vacuum batch process (15 g/l/day) or four times that obtained without vacuum (8 g/l/day). 8 references.

  8. HIGH PRODUCTIVITY VACUUM BLASTING SYSTEM

    International Nuclear Information System (INIS)

    McPhee, William S.

    2001-01-01

    The Department of Energy (DOE) needs improved technologies to decontaminate large areas of both concrete and steel surfaces. The technology should have high operational efficiency, minimize exposures to workers, and produce low levels of secondary waste. In order to meet the DOE's needs, an applied research and development project for the improvement of a current decontamination technology, Vacuum Blasting, is proposed. The objective of this project is to improve the productivity and lower the expense of the existing vacuum blasting technology which has been widely used in DOE sites for removing radioactive contamination, PCBs, and lead-based paint. The proposed work would increase the productivity rate and provide safe and cost-effective decontamination of the DOE sites

  9. Ultrahigh vacuum system of the heavy ion transport line at Brookhaven

    International Nuclear Information System (INIS)

    Hseuh, H.C.; Feigenbaum, I.; Manni, M.; Stattel, P.; Skelton, R.

    1985-01-01

    Heavy ions with an energy up to 8 MeV/A for S +16 and 1 MeV/A for Au +34 from the 16 MV Tandem will be injected into the AGS for further acceleration to less than or equal to 15 GeV/A. A 600-meter beam transport line between the Tandem and the AGS has been designed and is under construction. This paper describes the design of the vacuum system of this transport line and the performance of the prototype vacuum sectors

  10. Quantum fluctuations in the dressed vacuum of a bosonic model system

    International Nuclear Information System (INIS)

    Wagner, R E; Su, Q; Grobe, R; Acosta, S; Glasgow, S A

    2012-01-01

    Quantum fluctuations and the polarizability of the vacuum state are sometimes interpreted in terms of virtual particles that come into and out of existence for a limited amount of time. We study the spatial and temporal properties of these auxiliary particles on a numerical space-time grid for a one-dimensional model system. This approach permits us to compute the average distance between virtual particles and their lifetime. The creation dynamics of the virtual particles from the bare vacuum state is also examined. (paper)

  11. Major Refurbishment of the University of Florida Training Reactor

    International Nuclear Information System (INIS)

    Joradn, Kelly; Berglund, Matthew; Shea, Brian

    2013-01-01

    The research reactor fleet is aging with few replacements being built. At the same time the technology for refurbishment of the older reactors has advanced well beyond that of currently installed equipment. The disparity between new and old technology results in an inability to find simple replacements for the older, highly integrated components. The lack of comprehensive guidance for digital equipment adds to the technical problems of installing individual replacement parts. Up to this point, no U. S. facilities have attempted a complete modernization effort because of the time commitment, financial burden, and licensing required for a total upgrade. The University of Florida Training Reactor is tackling this problem with a replacement of nearly all of the major facility sub-systems, including electrical distribution, reactor controls, nuclear instrumentation, security, building management, and environmental controls. This approach offers increased flexibility over the piece-by-piece replacement method by leveraging modern control systems based on global standards and capable of good data interchange with higher levels of redundancy. The UFTR reviewed numerous technologies to arrive at the final system architecture and this 'clean-slate' installation methodology. It is this concept of total system replacement and strict use of modular, open-standards technology that has allowed for a facility design that will be easy to install, maintain, and build upon over time

  12. Major Refurbishment of the University of Florida Training Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Joradn, Kelly; Berglund, Matthew; Shea, Brian [Univ., of Florida, Florida (United States)

    2013-07-01

    The research reactor fleet is aging with few replacements being built. At the same time the technology for refurbishment of the older reactors has advanced well beyond that of currently installed equipment. The disparity between new and old technology results in an inability to find simple replacements for the older, highly integrated components. The lack of comprehensive guidance for digital equipment adds to the technical problems of installing individual replacement parts. Up to this point, no U. S. facilities have attempted a complete modernization effort because of the time commitment, financial burden, and licensing required for a total upgrade. The University of Florida Training Reactor is tackling this problem with a replacement of nearly all of the major facility sub-systems, including electrical distribution, reactor controls, nuclear instrumentation, security, building management, and environmental controls. This approach offers increased flexibility over the piece-by-piece replacement method by leveraging modern control systems based on global standards and capable of good data interchange with higher levels of redundancy. The UFTR reviewed numerous technologies to arrive at the final system architecture and this 'clean-slate' installation methodology. It is this concept of total system replacement and strict use of modular, open-standards technology that has allowed for a facility design that will be easy to install, maintain, and build upon over time.

  13. Elmo Bumpy Torus proof of principle, Phase II: Title 1 report. Volume V. Vacuum-pumping system. Preliminary design report

    International Nuclear Information System (INIS)

    1982-01-01

    This report summarizes Title I Preliminary Design of the EBT-P Vacuum Pumping System. The Vacuum Pumping System has been designed by the McDonnell Douglas Astronautics Co. - St. Louis (MDAC). It includes the necessary vacuum pumps and vacuum valves to evacuate the torus, the Mirror Coil Dewars (MC Dewars), and the Gyrotron Magnet Dewars. The pumping ducts, manifolds, and microwave protection system are also included. A summary of the function of each subsystem and a description of its principle components is provided below. The analyses performed during the system design are also identified

  14. Evaluation of a Prototype Hybrid Vacuum Pump to Provide Vacuum-Assisted Suspension for Above-Knee Prostheses.

    Science.gov (United States)

    Major, Matthew J; Caldwell, Ryan; Fatone, Stefania

    2015-12-01

    Vacuum-assisted suspension (VAS) of prosthetic sockets utilizes a pump to evacuate air from between the prosthetic liner and socket, and are available as mechanical or electric systems. This technical note describes a hybrid pump that benefits from the advantages of mechanical and electric systems, and evaluates a prototype as proof-of-concept. Cyclical bench testing of the hybrid pump mechanical system was performed using a materials testing system to assess the relationship between compression cycles and vacuum pressure. Phase 1 in vivo testing of the hybrid pump was performed by an able-bodied individual using prosthesis simulator boots walking on a treadmill, and phase 2 involved an above-knee prosthesis user walking with the hybrid pump and a commercial electric pump for comparison. Bench testing of 300 compression cycles produced a maximum vacuum of 24 in-Hg. In vivo testing demonstrated that the hybrid pump continued to pull vacuum during walking, and as opposed to the commercial electric pump, did not require reactivation of the electric system during phase 2 testing. The novelty of the hybrid pump is that while the electric system provides rapid, initial vacuum suspension, the mechanical system provides continuous air evacuation while walking to maintain suspension without reactivation of the electric system, thereby allowing battery power to be reserved for monitoring vacuum levels.

  15. Paraformaldehyde pellet not necessary in vacuum-pumped maple sap system

    Science.gov (United States)

    H. Clay Smith; Carter B. Gibbs

    1970-01-01

    In a study of sugar maple sap collection through a vacuum-pumped plastic tubing system, yields were compared between tapholes in which paraformaldehyde pellets were used and tapholes without pellets, Use of the pellets did not increase yield.

  16. Refurbishment of the transportation equipment, Task 3.08/04-10

    International Nuclear Information System (INIS)

    Nikolic, M.; Bratic, A.

    1963-01-01

    Transportation equipment at the RA reactor includes the bridge crane in the reactor hall, another smaller crane, bridge crane in spent fuel storage space, crane for handling the fuel containers n the room 099 and cart of the transportation channel. Regular testing and maintenance during reactor operation was not considered sufficient, and for that reason the repair and maintenance actions were done during the refurbishment of the reactor while it has been shut-down

  17. Nonperturbative Dynamical Casimir Effect in Optomechanical Systems: Vacuum Casimir-Rabi Splittings

    Directory of Open Access Journals (Sweden)

    Vincenzo Macrì

    2018-02-01

    Full Text Available We study the dynamical Casimir effect using a fully quantum-mechanical description of both the cavity field and the oscillating mirror. We do not linearize the dynamics, nor do we adopt any parametric or perturbative approximation. By numerically diagonalizing the full optomechanical Hamiltonian, we show that the resonant generation of photons from the vacuum is determined by a ladder of mirror-field vacuum Rabi splittings. We find that vacuum emission can originate from the free evolution of an initial pure mechanical excited state, in analogy with the spontaneous emission from excited atoms. By considering a coherent drive of the mirror, using a master-equation approach to take losses into account, we are able to study the dynamical Casimir effect for optomechanical coupling strengths ranging from weak to ultrastrong. We find that a resonant production of photons out of the vacuum can be observed even for mechanical frequencies lower than the cavity-mode frequency. Since high mechanical frequencies, which are hard to achieve experimentally, were thought to be imperative for realizing the dynamical Casimir effect, this result removes one of the major obstacles for the observation of this long-sought effect. We also find that the dynamical Casimir effect can create entanglement between the oscillating mirror and the radiation produced by its motion in the vacuum field, and that vacuum Casimir-Rabi oscillations can occur. Finally, we also show that all these findings apply not only to optomechanical systems, but also to parametric amplifiers operating in the fully quantum regime.

  18. 46 CFR 154.804 - Vacuum protection.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Vacuum protection. 154.804 Section 154.804 Shipping... Systems § 154.804 Vacuum protection. (a) Except as allowed under paragraph (b) of this section, each cargo tank must have a vacuum protection system meeting paragraph (a)(1) of this section and either paragraph...

  19. Vacuum type D initial data

    Science.gov (United States)

    García-Parrado Gómez-Lobo, Alfonso

    2016-09-01

    A vacuum type D initial data set is a vacuum initial data set of the Einstein field equations whose data development contains a region where the space–time is of Petrov type D. In this paper we give a systematic characterisation of a vacuum type D initial data set. By systematic we mean that the only quantities involved are those appearing in the vacuum constraints, namely the first fundamental form (Riemannian metric) and the second fundamental form. Our characterisation is a set of conditions consisting of the vacuum constraints and some additional differential equations for the first and second fundamental forms These conditions can be regarded as a system of partial differential equations on a Riemannian manifold and the solutions of the system contain all possible regular vacuum type D initial data sets. As an application we particularise our conditions for the case of vacuum data whose data development is a subset of the Kerr solution. This has applications in the formulation of the nonlinear stability problem of the Kerr black hole.

  20. Automatic gas-levitation system for vacuum deposition of laser-fusion targets

    International Nuclear Information System (INIS)

    Jordan, C.W.; Cameron, G.R.; Krenik, R.M.; Crane, J.K.

    1981-01-01

    An improved simple system has been developed to gas-levitate microspheres during vacuum-deposition processes. The automatic operation relies on two effects: a lateral stabilizing force provided by a centering-ring; and an automatically incremented gas metering system to offset weight increases during coating

  1. A study of some features of the ultra high vacuum systems for EPIC

    International Nuclear Information System (INIS)

    Elsey, R.J.; Bennett, J.R.J.; Dossett, A.J.

    1977-01-01

    This report covers the experimental work carried out towards the development of the ultra high vacuum for the proposed electron positron storage ring, EPIC. Experiments included outgassing tests on samples of materials and pump-down tests on full scale aluminium vessels. The effect of baking was investigated. The approval of the similar machine PETRA at Hamburg and the subsequent withdrawal of the EPIC proposal in October 1975 curtailed the vacuum work. The experiments reported here are therefore incomplete, but nevertheless proved useful in showing that there should have been no major problems with building the vacuum system for EPIC. (author)

  2. Validated design of the ITER main vacuum pumping systems

    International Nuclear Information System (INIS)

    Day, Chr.; Antipenkov, A.; Dremel, M.; Haas, H.; Hauer, V.; Mack, A.; Boissin, J.-C.; Class, G.; Murdoch, D.K.; Wykes, M.

    2005-01-01

    Forschungszentrum Karlsruhe is developing the ITER high vacuum cryogenic pumping systems (torus, cryostat, NBI) as well as the corresponding mechanical roughing pump trains. All force-cooled big cryopumps incorporate similar design of charcoal coated cryopanels cooled to 5 K with supercritical helium. A model of the torus exhaust cryopump was comprehensively characterised in the TIMO testbed at Forschungszentrum. This paper discusses the vacuum performance results of the model pump and outlines how these data were incorporated in a sound design of the whole ITER torus exhaust pumping system. To do this, the dedicated software package ITERVAC was developed which is able to describe gas flow in viscous, transitional and molecular flow regimes as needed for the gas coming through the divertor slots and along the pump ducts into the cryopumps. The entrance section between the divertor cassettes and each pumping duct was identified to be the bottleneck of the gas flow. The interrelation of achievable throughputs as a function of the divertor pressure and the cryopump pumping speed is discussed. The system design is completed by assessment of the NBI cryopump system and integrating performance curves for the roughing pump trains needed during the regeneration phases of the cryopumps. (author)

  3. Ultra-high vacuum system of the Brookhaven National Synchrotron Light Source

    International Nuclear Information System (INIS)

    Foerster, C.L.

    1995-01-01

    The rings of the National Synchrotron Light Source (NSLS) have been supplying light to numerous users for approximately a decade and recently a fully conditioned machine vacuum at design currents was obtained. A brief description of the x-ray storage ring, the VUV storage ring and their current supply is given along with some of their features. The ultra-high vacuum system employed for the storage rings and their advantages for the necessary stored beam environments are discussed including, a brief history of time. 15 refs., 2 tabs., 8 figs

  4. Waveguide transition with vacuum window for multiband dynamic nuclear polarization systems

    Energy Technology Data Exchange (ETDEWEB)

    Rybalko, Oleksandr; Bowen, Sean; Zhurbenko, Vitaliy [Technical University of Denmark, Ørsteds Plads 349, 2800 Kgs. Lyngby (Denmark); Ardenkjær-Larsen, Jan Henrik, E-mail: jhar@elektro.dtu.dk [Technical University of Denmark, Ørsteds Plads 349, 2800 Kgs. Lyngby (Denmark); GE Healthcare, Park Alle 295, Brøndby (Denmark)

    2016-05-15

    A low loss waveguide transition section and oversized microwave vacuum window covering several frequency bands (94 GHz, 140 GHz, 188 GHz) is presented. The transition is compact and was optimized for multiband Dynamic Nuclear Polarization (DNP) systems in a full-wave simulator. The window is more broadband than commercially available windows, which are usually optimized for single band operation. It is demonstrated that high-density polyethylene with urethane adhesive can be used as a low loss microwave vacuum window in multiband DNP systems. The overall assembly performance and dimensions are found using full-wave simulations. The practical aspects of the window implementation in the waveguide are discussed. To verify the design and simulation results, the window is tested experimentally at the three frequencies of interest.

  5. Vacuum system design and tritium inventory for the charge exchange diagnostic on the Tokamak Fusion Test Reactor

    International Nuclear Information System (INIS)

    Medley, S.S.

    1986-01-01

    The application of charge exchange analyzers for the measurement of ion temperature in fusion plasma experiments requires a direct connection between the diagnostic and plasma-discharge vacuum chambers. Differential pumping of the gas load from the diagnostic stripping cell operated at > or approx. = 10 -3 Torr is required to maintain the analyzer chamber at a pressure of -6 Torr. The migration of gases between the diagnostic and plasma vacuum chambers must be minimized. In particular, introduction of the analyzer stripping cell gas into the plasma chamber having a base pressure of -8 Torr must be suppressed. The charge exchange diagnostic for the Tokamak Fusion Test Reactor (TFTR) is comprised of two analyzer systems designed to contain a total of 18 independent mass/energy analyzers and one diagnostic neutral beam rated at 80 keV, 15 A. The associated arrays of multiple, interconnected vacuum systems were analyzed using the Vacuum System Transient Simulator (Vsts) computer program which models the transient transport of multigas species through complex networks of ducts, valves, traps, vacuum pumps, and other related vacuum system components. In addition to providing improved design performance at reduced costs, the analysis yields estimates for the exchange of tritium from the torus to the diagnostic components and of the diagnostic working gases to the torus

  6. Application of vacuum membrane distillation to lithium bromide absorption refrigeration system

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Zanshe; Feng, Shiyu; Li, Yun [School of Energy and Power Engineering, Xi' an Jiaotong University, Xi' an 710049 (China); Gu, Zhaolin [School of Human Settlement and Civil Engineering, Xi' an Jiaotong University, Xi' an 710049 (China)

    2009-11-15

    Conventional generator in lithium bromide absorption refrigeration system is too bulky and heavy to be fitted into small scale device, and the temperature of the driving heater in the generator seems much higher than low grade energy such as regenerative energy or waste heat energy. In this paper, desorption of aqueous lithium bromide solution by vacuum membrane distillation process was presented. Hollow fiber membrane module made by polyvinylidene fluoride was used as desorption device of aqueous lithium bromide solution. Influencing factors of feed flux, feed temperature in lumen side and vacuum pressure in shell side were tested and analyzed with orthogonal test. The results showed that permeation flux of water vapor increased with the feed temperature increasing and the feed flux increasing in lumen side, and the permeation flux also went up along with absolute pressure drop in shell side. Feasibility and potential application analysis shows that the temperature of the driving heat was low and the volume and weight of the desorption device was light. In this study, vacuum membrane distillation to the lithium bromide absorption refrigeration system has proved to be an efficient and cheap desorption mode. (author)

  7. Analytical cell decontamination and shielding window refurbishment. Final report, March 1984-March 1985

    International Nuclear Information System (INIS)

    Smokowski, R.T.

    1985-01-01

    This is a report on the decontamination and refurbishment of five inactive contaminated analytical cells and six zinc bromide filled shielding windows. The analytical cells became contaminated during the nuclear fuel reprocessing carried out by Nuclear Fuel Services from 1966 to 1972. The decontamination and decommissioning (D and D) work was performed in these cells to make them useful as laboratories in support of the West Valley Demonstration Project. To accomplish this objective, unnecessary equipment was removed from these cells. Necessary equipment and the interior of each cell were decontaminated and repaired. The shielding windows, essentially tanks holding zinc bromide, were drained and disassembled. The deteriorated, opaque zinc bromide was refined to optical clarity and returned to the tanks. All wastes generated in this operation were characterized and disposed of properly. All the decontamination and refurbishment was accomplished within 13 months. The Analytical Hot Cell has been turned over to Analytical Chemistry for the performance high-level waste (HLW) characterization analysis

  8. The vacuum system for insertion devices at the Advanced Photon Source

    International Nuclear Information System (INIS)

    Trakhtenberg, E.; Gluskin, E.; Den Hartog, P.; Klippert, T.; Wiemerslage, G.; Xu, S.

    1995-01-01

    A vacuum system for the insertion devices at the Advanced Photon Source was designed, and chambers of this design were successfully manufactured and tested. Three different versions of the vacuum chamber have been developed with vertical apertures of 12 mm, 8mm, and 5 mm, respectively. The chambers are fabricated by extruding 6063 aluminum alloy to form a tube with the desired internal shaped and machining the exterior to finish dimensions. The wall thickness of the completed chamber at the beam orbit position is 1 mm. The design utilizes a rigid strongback that limits deflection of the chamber under vacuum despite the thin wall. Chambers with lengths of 2.2m and 5.2 m have been fabricated. Pumping is accomplished by a combination of lumped and distributed non-evaporable getters and ion pumps. An ultimate pressure of 5.1· -11 torr was achieved with the 12-mm vertical aperture prototype. Alignment of the vacuum chamber on its support can be made with a precision of ± 25 μm in the vertical plane, which allows minimum insertion device pole gaps of 14.5 mm, 10.5 mm, and 7.5 mm

  9. Cold Vacuum Drying facility condensate collection system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) condensate collection system (CCS). The function of the CCS is to collect cooling coil condensate from air-handling units in the CVDF and to isolate the condensate in collection tanks until the condensate is determined to be acceptable to drain to the effluent drain collection basin

  10. Remote vacuum or pressure sealing device and method for critical isolated systems

    Science.gov (United States)

    Brock, James David [Newport News, VA; Keith, Christopher D [Newport News, VA

    2012-07-10

    A remote vacuum or pressure sealing apparatus and method for making a radiation tolerant, remotely prepared seal that maintains a vacuum or pressure tight seal throughout a wide temperature range. The remote sealing apparatus includes a fixed threaded sealing surface on an isolated system, a gasket, and an insert consisting of a plug with a protruding sample holder. An insert coupling device, provided for inserting samples within the isolated system, includes a threaded fastener for cooperating with the fixed threaded sealing surface on the isolated system. The insert coupling device includes a locating pin for azimuthal orientation, coupling pins, a tooted coaxial socket wrench, and an insert coupling actuator for actuating the coupling pins. The remote aspect of the sealing apparatus maintains the isolation of the system from the user's environment, safely preserving the user and the system from detrimental effect from each respectively.

  11. Introduction to the magnet and vacuum systems of an electron storage ring

    International Nuclear Information System (INIS)

    Weng, W.T.

    1982-01-01

    An accelerator or storage ring complex is a concerted interplay of various functional systems. For the convenience of discussion we can divide it into the following systems: injector, magnet, RF, vacuum, instrumentation and control. In addition, the conventional construction of the building and radiation safety consideration are also needed and finally the beam lines, detector, data acquisition and analysis set-ups for research programs. Dr. L. Teng has given a comprehensive review of the whole complex and the operation of such a facility. I concentrate on the description of magnet and vacuum systems. Only the general function of each system and the basic design concepts will be introduced, no detailed engineering practice will be given which will be best done after a machine design is produced. For further understanding and references a table of bibliography is provided at the end of the paper

  12. Vacuum pumping for controlled thermonuclear reactors

    International Nuclear Information System (INIS)

    Watson, J.S.; Fisher, P.W.

    1976-01-01

    Thermonuclear reactors impose unique vacuum pumping problems involving very high pumping speeds, handling of hazardous materials (tritium), extreme cleanliness requirements, and quantitative recovery of pumped materials. Two principal pumping systems are required for a fusion reactor, a main vacuum system for evacuating the torus and a vacuum system for removing unaccelerated deuterium from neutral beam injectors. The first system must pump hydrogen isotopes and helium while the neutral beam system can operate by pumping only hydrogen isotopes (perhaps only deuterium). The most promising pumping techniques for both systems appear to be cryopumps, but different cryopumping techniques can be considered for each system. The main vacuum system will have to include cryosorption pumps cooled to 4.2 0 K to pump helium, but the unburned deuterium-tritium and other impurities could be pumped with cryocondensation panels (4.2 0 K) or cryosorption panels at higher temperatures. Since pumping speeds will be limited by conductance through the ducts and thermal shields, the pumping performance for both systems will be similar, and other factors such as refrigeration costs are likely to determine the choice. The vacuum pumping system for neutral beam injectors probably will not need to pump helium, and either condensation or higher temperature sorption pumps can be used

  13. Vacuum exhaustion system for thermonuclear reactor and cryopump thereof

    International Nuclear Information System (INIS)

    Kobayashi, Shigetada.

    1992-01-01

    An impurity removing device is connected to a gas exhaust side of a plasma vacuum vessel by way of a gate valve, a cryopump is connected to the exit side of the device by way of an exit valve, a fuel transfer line is disposed for transferring fuels to a fuel purification system and a vacuum pump line is disposed to an exhaust gas line. Further, a tritium monitor is disposed to an exhaustion line and the line on the side of the exit of the monitor is branched into two ways, in which a tritium transfer pipe is disposed to one of them and an atmosphere release pipe is disposed on the other of them by way of an atmosphere releasing valve. Further, a condensation shebron is disposed for flowing in and out fuel isotope gases discharged from the plasma vacuum vessel, and a funnel discharge pipe is disposed for discharging a liquefied and condensed fluid. Since the gases to be exhausted are liquefied and condensed without coagulation or coagulation products are removed while operating the pump, the exhaust gases are processed continuously to reduce tritium inventory and make the regeneration step unnecessary and remarkably improve the heat efficiency. (N.H.)

  14. Advanced light source vacuum policy and vacuum guidelines for beamlines and experiment endstations

    International Nuclear Information System (INIS)

    Hussain, Z.

    1995-08-01

    The purpose of this document is to: (1) Explain the ALS vacuum policy and specifications for beamlines and experiment endstations. (2) Provide guidelines related to ALS vacuum policy to assist in designing beamlines which are in accordance with ALS vacuum policy. This document supersedes LSBL-116. The Advanced Light Source is a third generation synchrotron radiation source whose beam lifetime depends on the quality of the vacuum in the storage ring and the connecting beamlines. The storage ring and most of the beamlines share a common vacuum and are operated under ultra-high-vacuum (UHV) conditions. All endstations and beamline equipment must be operated so as to avoid contamination of beamline components, and must include proper safeguards to protect the storage ring vacuum from an accidental break in the beamline or endstation vacuum systems. The primary gas load during operation is due to thermal desorption and electron/photon induced desorption of contaminants from the interior of the vacuum vessel and its components. The desorption rates are considerably higher for hydrocarbon contamination, thus considerable emphasis is placed on eliminating these sources of contaminants. All vacuum components in a beamline and endstation must meet the ALS vacuum specifications. The vacuum design of both beamlines and endstations must be approved by the ALS Beamline Review Committee (BRC) before vacuum connections to the storage ring are made. The vacuum design is first checked during the Beamline Design Review (BDR) held before construction of the beamline equipment begins. Any deviation from the ALS vacuum specifications must be approved by the BRC prior to installation of the equipment on the ALS floor. Any modification that is incorporated into a vacuum assembly without the written approval of the BRC is done at the user's risk and may lead to rejection of the whole assembly

  15. Seawater desalination with solar-energy-integrated vacuum membrane distillation system

    Directory of Open Access Journals (Sweden)

    Fang Wang

    2017-03-01

    Full Text Available This study designed and tested a novel type of solar-energy-integrated vacuum membrane distillation (VMD system for seawater desalination under actual environmental conditions in Wuhan, China. The system consists of eight parts: a seawater tank, solar collector, solar cooker, inclined VMD evaporator, circulating water vacuum pump, heat exchanger, fresh water tank, and brine tank. Natural seawater was used as feed and a hydrophobic hollow-fiber membrane module was used to improve seawater desalination. The experiment was conducted during a typical summer day. Results showed that when the highest ambient temperature was 33 °C, the maximum value of the average solar intensity was 1,080 W/m2. The system was able to generate 36 kg (per m2 membrane module distilled fresh water during 1 day (7:00 am until 6:00 pm, the retention rate was between 99.67 and 99.987%, and electrical conductivity was between 0.00276 and 0.0673 mS/cm. The average salt rejection was over 90%. The proposed VMD system shows favorable potential application in desalination of brackish waters or high-salt wastewater treatment, as well.

  16. Refurbishment and modification of existing protective shipping packages (for 30-inch UF{sub 6} cylinders) per USDOT specification No. USA-DOT-21PF-1A

    Energy Technology Data Exchange (ETDEWEB)

    Housholder, W.R. [Nuclear Containers, Incorporated, Elizabethton, TN (United States)

    1991-12-31

    This paper addresses the refurbishment procedures for existing shipping containers for 30-inch diameter UF{sub 6} cylinders in accordance with DOT Specification 21PF-1 and the criteria used to determine rejection when such packages are unsuitable for refurbishment.

  17. 2 MeV/20 kW industrial electron beam accelerator vis-s-vis its vacuum system

    International Nuclear Information System (INIS)

    Khader, S.A.; Assadullah, M.; Sarma, K.S.S.; Bandi, L.N.

    2003-01-01

    Full text: Electron beam accelerators in the energy range 200 keV to 10 MeV have been extensively used for many radiation processing applications that include polymerization, polymer modifications, radiation sterilization, food irradiation and gem coloration. The accelerator technology is a multidisciplinary one wherein production of stable vacuum in various accelerator systems is of utmost importance to achieve required output beam parameters like beam energy and current for processing industrial products at large through puts on continuous basis. A 2 MeV, 20 kW industrial electron beam accelerator has been in operation since 2001 at BARC-BRIT complex, Navi Mumbai for commercial and R and D applications like crosslinking of wire and cables, heat shrinkable tubes, PE O rings, PTEE degradation and color enhancement in diamonds. The machine is a ILU-6 type pulse RF accelerator consisting of a single resonator copper cavity of 1.2 m diameter and 1.2 m height (volume:∼ 1.5 m3) placed inside a stainless steel container (called cavity container) and a s.s. beam extraction window wherein vacuum needs to be maintained at a minimum 10-6 torr. Four sputter ion pumps are directly fixed on the cavity container to obtain maximum pumping efficiency. The fore vacuum is generated using a combination rotary and a roots pump. The beam extraction widow has a 50 and 956 m thick titanium foil acting as the exit window for electrons from the vacuum into air. Both the cavity and the beam extraction window are coupled through a gate valve which acts as a vacuum separator isolating the systems from each other during foil puncture, scanning system failure or any other related problems. This paper reports details of the vacuum system, measurements, vacuum leaks and detection and the operational experience related to maintenance and troubleshooting exercises that have been carried in the accelerator

  18. Cold Vacuum Drying facility personnel monitoring system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) instrument air (IA) system that provides instrument quality air to the CVDF. The IA system provides the instrument quality air used in the process, HVAC, and HVAC instruments. The IA system provides the process skids with air to aid in the purging of the annulus of the transport cask. The IA system provides air for the solenoid-operated valves and damper position controls for isolation, volume, and backdraft in the HVAC system. The IA system provides air for monitoring and control of the HVAC system, process instruments, gas-operated valves, and solenoid-operated instruments. The IA system also delivers air for operating hand tools in each of the process bays

  19. Modeling of complex gas distribution systems operating under any vacuum conditions: Simulations of the ITER divertor pumping system

    International Nuclear Information System (INIS)

    Vasileiadis, N.; Tatsios, G.; Misdanitis, S.; Valougeorgis, D.

    2016-01-01

    Highlights: • An integrated s/w for modeling complex rarefied gas distribution systems is presented. • Analysis is based on kinetic theory of gases. • Code effectiveness is demonstrated by simulating the ITER divertor pumping system. • The present s/w has the potential to support design work in large vacuum systems. - Abstract: An integrated software tool for modeling and simulation of complex gas distribution systems operating under any vacuum conditions is presented and validated. The algorithm structure includes (a) the input geometrical and operational data of the network, (b) the definition of the fundamental set of network loops and pseudoloops, (c) the formulation and solution of the mass and energy conservation equations, (d) the kinetic data base of the flow rates for channels of any length in the whole range of the Knudsen number, supporting, in an explicit manner, the solution of the conservation equations and (e) the network output data (mainly node pressures and channel flow rates/conductance). The code validity is benchmarked under rough vacuum conditions by comparison with hydrodynamic solutions in the slip regime. Then, its feasibility, effectiveness and potential are demonstrated by simulating the ITER torus vacuum system with the six direct pumps based on the 2012 design of the ITER divertor. Detailed results of the flow patterns and paths in the cassettes, in the gaps between the cassettes and along the divertor ring, as well as of the total throughput for various pumping scenarios and dome pressures are provided. A comparison with previous results available in the literature is included.

  20. Regulating vacuum pump speed with feedback control

    International Nuclear Information System (INIS)

    Ludington, D.C.; Aneshansley, D.J.; Pellerin, R.; Guo, F.

    1992-01-01

    Considerable energy is wasted by the vacuum pump/motor on dairy farms. The output capacity (m 3 /min or cfm) of the vacuum pump always exceeds the capacity needed to milk cows and wash pipelines. Vacuum pumps run at full speed and load regardless of actual need for air. Excess air is admitted through a controller. Energy can be saved from electrical demand reduced by regulating vacuum pump speed according to air based on air usage. An adjustable speed drive (ASD) on the motor and controlled based upon air usage, can reduce the energy used by the vacuum pump. However, the ASD unit tested could not maintain vacuum levels within generally accepted guidelines when air usage changed. Adding a high vacuum reserve and a dual vacuum controller between the vacuum pump and the milking pipeline brought vacuum stability within guidelines. The ASD/dual vacuum system can reduce energy consumption and demand by at least 50 percent during milking and provide better vacuum stability than conventional systems. Tests were not run during washing cycles. Using 1990 costs and only the energy saved during milking, the simple payback on investment in new equipment for a 5 hp motor, speed controller and vacuum regulator would be about 5 years

  1. Modern vacuum physics

    CERN Document Server

    Chambers, Austin

    2005-01-01

    Modern Vacuum Physics presents the principles and practices of vacuum science and technology along with a number of applications in research and industrial production. The first half of the book builds a foundation in gases and vapors under rarefied conditions, The second half presents examples of the analysis of representative systems and describes some of the exciting developments in which vacuum plays an important role. The final chapter addresses practical matters, such as materials, components, and leak detection. Throughout the book, the author''s explanations are presented in terms of first principles and basic physics, augmented by illustrative worked examples and numerous figures.

  2. Cold Vacuum Drying Safety Class Instrumentation and Control System Design Description SYS 93-2

    International Nuclear Information System (INIS)

    WHITEHURST, R.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) Safety Class Instrumentation and Control system (SCIC). The SCIC provides safety functions and features to protect the environment, off-site and on-site personnel and equipment. The function of the SCIC is to provide automatic trip features, valve interlocks, alarms, indication and control for the cold vacuum drying process

  3. Fatigue load considerations and use of high efficiency materials in the nuclear refurbishment projects: a structural engineering perspective

    Energy Technology Data Exchange (ETDEWEB)

    Mohee, F. M., E-mail: fmm_p@yahoo.com [Univ. of Waterloo, ON (Canada)

    2014-07-01

    For the Darlington refurbishment project in Canada, fatigue load consideration is a very crucial component in the analysis and design of different structures in the nuclear facilities. New and innovative structural materials having much higher ultimate tensile strength and modulus of elasticity, that are free from corrosion, should be considered along with fatigue load during the analysis and design of the nuclear refurbishment projects. The structural analysis should include beam, column and slabs, vibrating, rotating and crane supporting structures, robotic structures, pipe supports, Serapid chain and associated automated gate structures, flask supporting structures, processing unit and lidding unit support structures. (author)

  4. Definition and means of maintaining the process vacuum liquid detection interlock systems portion of the PFP safety envelope

    International Nuclear Information System (INIS)

    THOMAS, R.J.

    1999-01-01

    The Process Vacuum Liquid Detection interlock systems prevent intrusion of process liquids into the HEPA filters downstream of demisters No.6 and No.7 during Process Vacuum System operation. This prevents liquid intrusion into the filters, which could cause a criticality. The Safety Envelope (SE) includes the equipment, which detects the presence of liquids in the vacuum headers; isolates the filters; shuts down the vacuum pumps; and alarms the condition. This report identifies the equipment in the SE operating, maintenance, and surveillance procedures needed to maintain the SE equipment; and rationale for exclusion of some equipment and testing from the SE

  5. A design study of the vacuum system of the Daresbury X-8 experimental line

    International Nuclear Information System (INIS)

    Brand, J.F.J. van den.

    1982-03-01

    This paper deals with the front-end vacuum system of the X 8 beam line at the Daresbury synchrotron radiation source. The vacuum system is represented by a matrix to allow calculation of pressure profiles for many sets of pumping-speed and desorption parameters. It is shown that for a mass spectrum consisting mainly of CO and N 2 it is possible to operate the machine side of the front-end system in the 10 -10 Torr pressure region and proof is given that the two conductance-stage can provide a pressure difference of 1:100. (Auth.)

  6. JACoW Integration of the vacuum SCADA with CERN's Enterprise Asset Management system

    CERN Document Server

    Rocha, Andre; Fraga, Jorge; Gkioka, Georgia; Gomes, Paulo; Gonzalez, Luis; Krastev, Tsvetelin; Riddone, Germana; Widegren, David

    2018-01-01

    With over 128Km of vacuum chambers, reaching pressures as low as in interstellar space, CERN is home to the largest vacuum system in the world. Its underlying architecture comprises approximately 15 000 pieces of control equipment, supervised and controlled by 7 Supervisory Control And Data Acquisition (SCADA) servers, and over 300 Programmable Logic Controllers (PLCs). Their configuration files are automatically generated from a set of ORACLE databases (vacDB) using a Java application (vacDB-Editor). The maintenance management of such an amount of equipment requires the usage of an Enterprise Asset Management system (EAM), where the life cycle of every equipment is tracked from reception through decommissioning. The equipment displayed in the vacuum SCADA is automatically integrated in its user interfaces (UIs) based on data available on vacDB. On the other hand, the equipment available in Infor-EAM for maintenance management activities (creation of work-orders, stock management, location tracking) resides i...

  7. Numerical Study on Radiation Effects to Evaporator in Natural Vacuum Solar Desalination System

    Science.gov (United States)

    Siregar, R. E. T.; Ronowikarto, A. D.; Setyawan, E. Y.; Ambarita, H.

    2018-01-01

    The need for clean water is increasing day by day due to the increasing factor of living standard of mankind, hence designed natural vacuum solar desalination. The natural vacuum Solar desalination is studied experimentally. A small-scale natural vacuum desalination study consists of evaporator and condenser as the main components designed and manufactured. To transfer heat from the solar collector into the evaporator, the fluid transfer system uses a pump powered by a solar cell. Thus, solar collectors are called hybrid solar collectors. The main purpose of this exposure is to know the characteristics of the radiation effects on incoming energy on the evaporator during the process. This system is tested by exposing the unit to the solar radiation in the 4th floor building in Medan. The experiment was conducted from 8.00 to 16.00 local time. The results show that natural vacuum solar desalination with hybrid solar collectors can be operated perfectly. If the received radiation is high, then the incoming energy received by the evaporator will also be high. From measurements with HOBO microstation, obtained the highest radiation 695.6 W/m2, and the calculation result of incoming energy received evaporator obtained highest result 1807.293 W.

  8. Indian Vacuum Society: The Indian Vacuum Society

    Science.gov (United States)

    Saha, T. K.

    2008-03-01

    expert members on the subject to deliver lectures and take part in devising courses in the universities. IVS publishes a quarterly called the `Bulletin of Indian Vacuum Society' since its inception, in which articles on vacuum and related topics are published. NIRVAT, news, announcements, and reports are the other features of the Bulletin. The articles in the Bulletin are internationally abstracted. The Bulletin is distributed free to all the members of the society. The society also publishes proceedings of national/international symposia and seminars, manuals, lecture notes etc. It has published a `Vacuum Directory' containing very useful information on vacuum technology. IVS has also set up its own website http://www.ivsnet.org in January 2002. The website contains information about IVS, list of members, list of EC members, events and news, abstracts of articles published in the `Bulletin of Indian Vacuum Society', utilities, announcements, reports, membership and other forms which can be completed online and also gives links to other vacuum societies. Our Society has been a member of the executive council of the International Union of Vacuum Science, Techniques and Applications (IUVSTA) and its various committees since 1970. In 1983 IVS conducted an International Symposium on Vacuum Technology and Nuclear Applications in BARC, Mumbai, under the sponsorship of IUVSTA. In 1987 IVS arranged the Triennial International Conference on Thin Films in New Delhi, where more than 200 foreign delegates participated. IVS also hosted the IUVSTA Executive Council Meeting along with the conference. The society organized yet again an International Conference on Vacuum Science and Technology and SRS Vacuum Systems at CAT, Indore in1995. IVS arranges the prestigious Professor Balakrishnan Memorial Lecture in memory of its founder vice-president. Leading scientists from India and abroad in the field are invited to deliver the talks. So far 23 lectures have been held in this series. IVS

  9. Surge-damping vacuum valve

    International Nuclear Information System (INIS)

    Bullock, J.C.; Kelley, B.E.

    1977-01-01

    A valve for damping out flow surges in a vacuum system is described. The surge-damping mechanism consists of a slotted, spring-loaded disk adjacent to the valve's vacuum port (the flow passage to the vacuum roughing pump). Under flow surge conditions, the differential pressure forces the disk into a sealing engagement with the vacuum port, thereby restricting the gas flow path to narrow slots in the disk's periphery. The increased flow damps out the flow surge. When pressure is equalized on both sides of the valve, the spring load moves the disk away from the port to restore full flow conductance through the valve

  10. The design of high vacuum system for baby electron beam machine (baby ebm): a comparison between theoretical and experimental

    International Nuclear Information System (INIS)

    Mohd Rizal Mamat; Rosli Darmawan; Lee Chee Huei; Mohd Rizal Md Chulan; Leo Kwee Wah; Muhamad Zahidee Taat; Fadzlie Nordin; Abu Bakar Mhd Ghazali

    2005-01-01

    Baby ebm which was developed to study the engineering and physics of electrons requires the use of high vacuum system in order to prevent electron loss and ionization of air molecules. In selecting the high vacuum system for baby ebm two main factors were considered: the ultimate pressure and the pump down time. The ultimate pressure required for the operation of the baby ebm is in 10-7 torr range. The pump down time was estimated from calculations, taking into account the vacuum pump and chamber size. The turbomolecular pump system (tmp), which is capable of achieving the required vacuum level was selected as the high vacuum system and installed to baby ebm. The tmp is currently fully operational. It was found that the vacuum pumping performance of the tmp differs considerably from what the calculations indicate. Compared to the calculations, it takes a much longer time to achieve the required operating pressure of baby ebm. This could be due to the fact that the formula used for the calculations was a very simplified formula that takes into account the main factors only which are the vacuum pump and chamber size. This paper attempts to present the comparison of the tmp performance between the theoretical and experimental. (Author)

  11. Ultrathin Polyimide-Stainless Steel Heater for Vacuum System Bake-out

    CERN Document Server

    Rathjen, Christian; Henrist, Bernard; Kölemeijer, Wilhelmus; Libera, Bruno; Lutkiewicz, Przemyslaw

    2005-01-01

    Space constraints in several normal conducting magnets of the LHC required the development of a dedicated permanent heater for vacuum chamber bake-out. The new heater consists of stainless steel bands inside layers of polyimide. The overall heater thickness is about 0.3 mm. The low magnetic permeability is suitable for applications in magnetic fields. The material combination allows for temperatures high enough to activate a NEG coating. Fabrication is performed in consecutive steps of tape wrapping. Automation makes high volume production at low costs possible. About 800 m of warm vacuum system of the long straight sections of the LHC will be equipped with the new heater. This paper covers experience gained at CERN from studies up to industrialization.

  12. TFTR diagnostic vacuum controller

    International Nuclear Information System (INIS)

    Olsen, D.; Persons, R.

    1981-01-01

    The TFTR diagnostic vacuum controller (DVC) provides in conjunction with the Central Instrumentation Control and Data Acquisition System (CICADA), control and monitoring for the pumps, valves and gauges associated with each individual diagnostic vacuum system. There will be approximately 50 systems on TFTR. Two standard versions of the controller (A and B) wil be provided in order to meet the requirements of two diagnostic manifold arrangements. All pump and valve sequencing, as well as protection features, will be implemented by the controller

  13. Vacuum considerations summary

    International Nuclear Information System (INIS)

    1977-01-01

    The vacuum system for Heavy Ion Fusion machines can be divided according to pressure into 4 parts: (a) Ion Sources; (b) Linear Accelerators; (c) Circular Accelerators, Accumulators and Storage Rings; and (d) Reactors. Since ion sources will need rather conventional pumping arrangements and reactors will operate with greater pressures, depending on their mode of operation, only items b and c will be treated in this report. In particular, the vacuum system design will be suggested for the machines proposed by various scenarios arrived at during the workshop. High mass numbers will be assumed

  14. The Control System of CERN Accelerators Vacuum (LS1 Activities and New Developments)

    CERN Document Server

    Gomes, P; Bellorini, F; Blanchard, S; Boivin, J P; Gama, J; Girardot, G; Pigny, G; Rio, B; Vestergard, H; Kopylov, L; Merker, S; Mikheev, M

    2014-01-01

    After 3 years of operation, the LHC entered its first Long Shutdown period (LS1), in February 2013 [1]. Major consolidation and maintenance works are being performed across the whole CERN’s Accelerator chain, in order to prepare the LHC to restart at higher energy, in 2015. The injector chain shall resume earlier, in mid-14. We report about the on-going vacuum-controls projects. Some of them concern the renovation of the controls of certain machines; others are associated with the consolidations of the vacuum systems of LHC and its injectors; and a few are completely new installations. ue to the wide age-span of the existing vacuum installations, there is a mix of design philosophies and of control-equipment generations. The renovations and the novel projects offer an opportunity to improve the uniformity and efficiency of vacuum controls by: reducing the number of equipment versions with similar functionality; identifying, naming, labelling, and documenting all pieces of equipment; homogenizing the contr...

  15. DC photogun vacuum characterization through photocathode lifetime studies

    International Nuclear Information System (INIS)

    Marcy Stutzman; Joseph Grames; Matt Poelker; Kenneth Surles-Law; Philip Adderley

    2007-01-01

    Excellent vacuum is essential for long photocathode lifetimes in DC high voltage photoelectron guns. Vacuum Research at Thomas Jefferson National Accelerator Facility has focused on characterizing the existing vacuum systems at the CEBAF polarized photoinjector and on quantifying improvements for new systems. Vacuum chamber preprocessing, full activation of NEG pumps and NEG coating the chamber walls should improve the vacuum within the electron gun, however, pressure measurement is difficult at pressures approaching the extreme-high-vacuum (XHV) region and extractor gauge readings are not significantly different between the improved and original systems. The ultimate test of vacuum in a DC high voltage photogun is the photocathode lifetime, which is limited by the ionization and back-bombardment of residual gasses. Discussion will include our new load-locked gun design as well as lifetime measurements in both our operational and new photo-guns, and the correlations between measured vacuum and lifetimes will be investigated

  16. Vacuum pumping concepts for ETF

    International Nuclear Information System (INIS)

    Homeyer, W.G.

    1980-09-01

    The Engineering Test Facility (ETF) poses unique vacuum pumping requirements due to its large size and long burn characteristics. These requirements include torus vacuum pumping initially and between burns and pumping of neutralized gas from divertor collector chambers. It was found that the requirements could be met by compound cryopumps in which molecular sieve 5A is used as the cryosorbent. The pumps, ducts, and vacuum valves required are large but fit with other ETF components and do not require major advances in vacuum pumping technology. Several additional design, analytical, and experimental studies were identified as needed to optimize designs and provide better design definition for the ETF vacuum pumping systems

  17. The Prevelence of SBS and Absenteeism among Children in Urban Refurbished Private Preshools

    Directory of Open Access Journals (Sweden)

    Salleh Naziah Muhamad

    2016-01-01

    Full Text Available The preschool education is compulsory to children in Malaysia. This regulation has encouraged more premises to be refurbished as a pre-school building. This paper examines the pupils’ absenteeism and the prevalence of Sick Building Symptoms (SBS initiated in congested private preschool with different ventilation strategies. The study analysed data from the attendance record of 10 classrooms and the questionnaire surveys administered to 151 parents about their children health symptoms once they were leaving the schools building. Questions on SBS used 5-point likert scale with symptoms concern on nose, eye, head, throat, skin, breath and tiredness. The descriptive and chi-square test applied to obtain the association of SBS and ventilation strategies in the classrooms. With quantitative and qualitative explanation, the unhealthy environment in refurbished pre-schools explained. Running nose, coughing and sore throat frequently reported in air-conditioning (AC classrooms. The higher absent rate found in AC classrooms. These symptoms show there were weaknesses in ventilation performance and environment in the selected preschools. Further analyses on objective measurements in future research are strongly recommended.

  18. Vacuum-packaged piezoelectric vibration energy harvesters: damping contributions and autonomy for a wireless sensor system

    International Nuclear Information System (INIS)

    Elfrink, R; Renaud, M; Kamel, T M; De Nooijer, C; Jambunathan, M; Goedbloed, M; Hohlfeld, D; Matova, S; Pop, V; Caballero, L; Van Schaijk, R

    2010-01-01

    This paper describes the characterization of thin-film MEMS vibration energy harvesters based on aluminum nitride as piezoelectric material. A record output power of 85 µW is measured. The parasitic-damping and the energy-harvesting performances of unpackaged and packaged devices are investigated. Vacuum and atmospheric pressure levels are considered for the packaged devices. When dealing with packaged devices, it is found that vacuum packaging is essential for maximizing the output power. Therefore, a wafer-scale vacuum package process is developed. The energy harvesters are used to power a small prototype (1 cm 3 volume) of a wireless autonomous sensor system. The average power consumption of the whole system is less than 10 µW, and it is continuously provided by the vibration energy harvester

  19. Austro-Hungarian Public Building Refurbishment and Energy Efficiency Measures - A Case Study on a Public Building in Sarajevo

    Science.gov (United States)

    Salihbegović, Amira; Čaušević, Amir; Rustempašić, Nerman; Avdić, Dženis; Smajlović, Esad

    2017-10-01

    Among other pieces of architectural historical heritage in Sarajevo, and Bosnia-Herzegovina in general, the Austro-Hungarian architecture has preserved its original architectural, artistic and engineering characteristics. Both residential and public representative urban blocks, streets and squares are of distinguishable ambience in the architectural and urban image of the city and are testifying about our architectural past. A number of buildings is valorised and protected by law in terms of their architectural, artistic and historical value. In addition, these buildings have a distinct functional, ambiental, historical, and even aesthetical value. To make them last longer, refurbishment of these buildings is challenging and presents potential and multiple benefits for the city, and beyond. Refurbishing built environment through functional reorganizing, redesign and energy efficiency measures applications could result in prolonged longevity, architectural identity preservation and interior comfort improvement. Besides, implemented measures for energy efficiency, through the refurbishment process, should optimize the needs for energy consumption in treated buildings. This paper defines options in comfort improvements and redesign, without implying risks to the building longevity, analyses interventions and energy efficiency measures which would enable potential energy saving assessment in the refurbishment process of masonry buildings. This paper also discusses the different techniques that can be adopted for conservation and preservation of historical masonry buildings from the Austro-Hungarian period dealing with energy efficiency. The works were preceded by historical research and on-site investigations. This paper describes a methodology to quantify their vulnerability. A scheme of structural retrofitting is suggested following the research conducted. Revitalization of the building consisted in the reconstruction of the old building structure, creating the inner

  20. Ultra high vacuum technology

    CERN Multimedia

    CERN. Geneva

    2001-01-01

    A short introduction for some basic facts and equations. Subsquently, discussion about: Building blocks of an ultrahigh vacuum system - Various types of pumps required to reach uhv and methods to reduce these effects - Outgassing phenomena induced by the presence of a particle beam and the most common methods to reduce these effects It will be given some practical examples from existing CERN accelerators and discuss the novel features of the future LHC vacuum system.

  1. [Ambulant treatment of wounds by vacuum sealing].

    Science.gov (United States)

    Ziegler, U E; Schmidt, K; Breithaupt, B; Menig, R; Debus, E S; Thiede, A

    2000-01-01

    The treatment of chronic wounds by vacuum sealing as an outpatient procedure is a new method of wound conditioning before closing the defect. The quality of life for the patient in his usual surrounding is maintained. Financial aspects also play a role in this treatment since costs for the health care system can be reduced. Various vacuum pumps, drainages and polymere foams are available and suitable for the outpatient treatment. The most important condition is to regularly check the vacuum. This can performed by the patient, the relatives or nursing staff. The main complication consists in loss of vacuum but technical and local or systemic complications can also appear. Individually applied vacuum dressings (polyvinyl foam, drainage tube and polymere foil) are practical. The ideal pump systems for the outpatient treatment are still not trial.

  2. Cold Vacuum Drying facility crane and hoist system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) crane and hoist system. The overhead crane and hoist system is located in the process bays of the CVDF. It supports the processes required to drain the water and dry the spent nuclear fuel contained in the multi-canister overpacks after they have been removed from the K-Basins. The cranes will also be used to assist maintenance activities within the bays, as required

  3. Energy refurbishment of the Italian residential building stock: energy and cost analysis through the application of the building typology

    International Nuclear Information System (INIS)

    Ballarini, Ilaria; Corrado, Vincenzo; Madonna, Francesco; Paduos, Simona; Ravasio, Franco

    2017-01-01

    The European residential building stock is largely composed of buildings with poor energy performance, therefore basic retrofit actions could lead to significant energy savings. However, energy refurbishment measures should be identified in accurate way, taking into account the technical viability and aiming both to increase the building energy performance and to restrain the costs. The present article investigates the effects of different measures applied to the Italian residential building stock by using the building typology, which consists of 120 building types, representative of six construction ages, four building sizes and five climatic zones. A quasi-steady state model has been used to calculate the energy performance; the economic evaluation has been carried out as specified in the EU cost-optimal comparative methodology (Directive 2010/31/EU). The most effective measures and packages of measures, in terms of energy saving and global cost reduction, are identified and discussed. The results are addressed to important purposes for energy policy, as for instance: (a) to provide political authorities with the most effective energy efficiency measures as to encourage retrofit processes through the allocation of financial incentives, (b) to offer a knowledge-base for developing energy refurbishment scenarios of residential building stocks and forecasting future energy resource demand. - Highlights: • Investigation of energy savings and cost effectiveness of the Italian housing stock refurbishments. • Application of the building typology approach of the IEE-TABULA project. • Knowledge-base for bottom-up models of the building stock energy performance. • Supporting the political authorities to promote effective refurbishment measures.

  4. Very Low-Cost, Rugged, High-Vacuum System for Mass Spectrometers, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA, the DoD, DHS, and commercial industry have a pressing need for miniaturized, rugged, low-cost, high vacuum systems. Recent advances in sensor technology at...

  5. Effect of electropolishing on vacuum furnace design

    Directory of Open Access Journals (Sweden)

    Sutanwi Lahiri

    2015-03-01

    Full Text Available The use of thermal shields of materials having low emissivity in vacuum furnaces is well-known. However, the surface condition of the heat shields is one of the most important factors governing their efficiency as radiation resistances. The emissivity of the thermal shields dictates the power rating of the heaters in furnace design. The unpolished materials used in the heater tests showed poor performance leading to loss of a signi­ficant percentage of the input power. The present work deals with the refur­bishment of the radiation heat shields used in a furnace for heating graphite structure. The effect of refurbishment of the heat shields by the buffing and subsequently electro­polishing was found to improve the performance of the shields as heat reflectors. The com­position of the electrolyte was chosen in such a way that the large shields of Mo, Inconel and SS can be polished using the same reagents in different ratios. The present work deals with the development of a standard electropolishing procedure for large metallic sheets and subsequently qualifying them by roughness and emissivity measure­ments. The improvement noted in the shielding efficiency of the furnace in the subsequent runs is also discussed here.

  6. Vacuum level effects on gait characteristics for unilateral transtibial amputees with elevated vacuum suspension.

    Science.gov (United States)

    Xu, Hang; Greenland, Kasey; Bloswick, Donald; Zhao, Jie; Merryweather, Andrew

    2017-03-01

    The elevated vacuum suspension system has demonstrated unique health benefits for amputees, but the effect of vacuum pressure values on gait characteristics is still unclear. The purpose of this study was to investigate the effects of elevated vacuum levels on temporal parameters, kinematics and kinetics for unilateral transtibial amputees. Three-dimensional gait analysis was conducted in 9 unilateral transtibial amputees walking at a controlled speed with five vacuum levels ranging from 0 to 20inHg, and also in 9 able-bodied subjects walking at self-preferred speed. Repeated ANOVA and Dunnett's t-test were performed to determine the effect of vacuum level and limb for within subject and between groups. The effect of vacuum level significantly affected peak hip external rotation and external knee adduction moment. Maximum braking and propulsive ground reaction forces generally increased for the residual limb and decreased for the intact limb with increasing vacuum. Additionally, the intact limb experienced an increased loading due to gait asymmetry for several variables. There was no systematic vacuum level effect on gait. Higher vacuum levels, such as 15 and 20inHg, were more comfortable and provided some relief to the intact limb, but may also increase the risk of osteoarthritis of the residual limb due to the increased peak external hip and knee adduction moments. Very low vacuum should be avoided because of the negative effects on gait symmetry. A moderate vacuum level at 15inHg is suggested for unilateral transtibial amputees with elevated vacuum suspension. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. Sustainable refurbishment of exterior walls and building facades. Final report, Part A - Methods and recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Hakkinen, T. (ed.)

    2012-11-01

    This report is the final report of Sustainable refurbishment of building facades and exterior walls (SUSREF). SUSREF project was a collaborative (small/medium size) research project within the 7th Framework Programme of the Commission and it was financed under the theme Environment (including climate change) (Grant agreement no. 226858). The project started in October 1st 2009 and ended in April 30th 2012. The project included 11 partners from five countries. SUSREF developed sustainable concepts and technologies for the refurbishment of building facades and external walls. This report together with SUSREF Final report Part B and SUSREF Final Report Part C introduce the main results of the project. Part A focuses on methodological issues. The descriptions of the concepts and the assessment results of the developed concepts are presented in SUSREF Final report part B (generic concepts) and SUSREF Final report Part C (SME concepts). (orig.)

  8. Development of distortion measurement system for large deployable antenna via photogrammetry in vacuum and cryogenic environment

    Science.gov (United States)

    Zhang, Pengsong; Jiang, Shanping; Yang, Linhua; Zhang, Bolun

    2018-01-01

    In order to meet the requirement of high precision thermal distortion measurement foraΦ4.2m deployable mesh antenna of satellite in vacuum and cryogenic environment, based on Digital Close-range Photogrammetry and Space Environment Test Technology of Spacecraft, a large scale antenna distortion measurement system under vacuum and cryogenic environment is developed in this paper. The antenna Distortion measurement system (ADMS) is the first domestic independently developed thermal distortion measurement system for large antenna, which has successfully solved non-contact high precision distortion measurement problem in large spacecraft structure under vacuum and cryogenic environment. The measurement accuracy of ADMS is better than 50 μm/5m, which has reached international advanced level. The experimental results show that the measurement system has great advantages in large structural measurement of spacecrafts, and also has broad application prospects in space or other related fields.

  9. Progress on the Design of the Storage Ring Vacuum System for the Advanced Photon Source Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Stillwell, B.; Billett, B.; Brajuskovic, B.; Carter, J.; Kirkus, E.; Lale, M.; Lerch, J.; Noonan, J.; O' Neill, M.; Rocke, B.; Suthar, K.; Walters, D.; Wiemerslage, G.; Zientek, J.

    2017-06-20

    Recent work on the design of the storage ring vacuum system for the Advanced Photon Source Upgrade project (APS-U) includes: revising the vacuum system design to accommodate a new lattice with reverse bend magnets, modifying the designs of vacuum chambers in the FODO sections for more intense incident synchrotron radiation power, modifying the design of rf-shielding bellows liners for better performance and reliability, modifying photon absorber designs to make better use of available space, and integrated planning of components needed in the injection, extraction and rf cavity straight sections. An overview of progress in these areas is presented.

  10. Current status of operation, utilization and refurbishment of the Dalat nuclear research reactor

    International Nuclear Information System (INIS)

    Pham Duy Hien.

    1993-01-01

    The reconstructed nuclear research reactor at Dalat, Vietnam has been put into operation since March 1984. Up to present a cumulative operation time of 13,172 hrs at nominal power (500 kW) has been recorded. Production of radioisotopes for medical uses, element analysis by using activation techniques, as well as fundamental and applied research with filtered neutrons are the main activities of reactor utilizations. The problems facing Dalat Nuclear Research Institute are the ageing of the re-used TRIGA-MARK-II reactor components (especially the corrosion of the reactor tank), as well as the obsolescence of many equipment and components of the reactor control and instrumentation system. Refurbishment works are being in process with the technical and financial supports from the Vietnam government and the IAEA. (author). 7 refs, 2 tabs, 10 figs

  11. Acoustical qualification of Teatro Nuovo in Spoleto before refurbishing works

    Science.gov (United States)

    Cocchi, Alessandro; Cesare Consumi, Marco; Shimokura, Ryota

    2004-05-01

    To qualify the acoustical quality of an opera house two different approaches are now available: one is based on responses of qualified listeners (subjective judgments) compared with objective values of selected parameters, the other on comparison tests conducted in suited rooms and on a model of the auditory brain system (preference). In the occasion of the refurbishment of an opera house known for the Two Worlds Festival edited yearly by the Italian Composer G. C. Menotti, a large number of measurements were taken with different techniques, so it is possible to compare the different methods and also the results with some geometrical criterion, based on the most simple rules of musical harmony, now neglected as our attention is attracted to computer simulations, computer aided measurement techniques and similar modern methods. From this work some link between well known acoustical parameters (not known at the time when architects sketched the shape of ancient opera houses) and geometrical criteria (well known at the time when ancient opera houses were built) will be shown.

  12. Novel Vacuum System for In-Situ Characterization of Fluorescence Properties of Thin Films

    Science.gov (United States)

    Onozuka, Kohei; Iwata, Nobuyuki; Yamamoto, Hiroshi

    We constructed a novel vacuum system in which the cathode luminescence properties of as-prepared films can be measured in-situ. It has been observed that the Zn-Ga-O films deposited on 500°C ITO by sputtering emits light with wavelength of about 500 nm from an ultra thin Zn-rich layer formed near film surface. The luminescence induced by irradiation of electrons has also been observed for the first time in the organic bilayered TPD/Alq3 films prepared in thermal evaporation. Its wavelength blue-shifts by about 120 nm in comparison with the electroluminescence of the same materials. The developed vacuum system is useful to characterize various thin films.

  13. Vacuum leak test technique of JT-60

    International Nuclear Information System (INIS)

    Kaminaga, Atsushi; Arai, Takashi; Kodama, Kozo; Sasaki, Noboru; Saidoh, Masahiro

    1998-01-01

    Since a vacuum vessel of JT-60 is very large (167 m 3 ) and is combined with many components, such as magnetic coils, neutral beam injection systems and RF heating systems, etc., the position of leak testing exceeds 700. The two kind of techniques for vacuum leak test used in JT-60 has been described. Firstly the probe helium gas can be fed remotely in the three-dimensionally sectioned 54 regions of the JT-60 torus. The leak test was very rapidly performed by using this method. Secondly the helium detector system has been modified by the additional installation of the cryopump, which reduced the background level of the deuterium gas. The sensitivity of vacuum leak test with the cryopump was two orders of magnitude larger than that of without it. The examples of the performed vacuum leak test are stated. The vacuum leaks during experiments were 9 times. They were caused by thermal strain and plasma discharge. The vacuum leaks just after maintenance are 36 times which mainly caused by mis-installation. (author)

  14. The localized quantum vacuum field

    International Nuclear Information System (INIS)

    Dragoman, D

    2008-01-01

    A model for the localized quantum vacuum is proposed in which the zero-point energy (ZPE) of the quantum electromagnetic field originates in energy- and momentum-conserving transitions of material systems from their ground state to an unstable state with negative energy. These transitions are accompanied by emissions and re-absorptions of real photons, which generate a localized quantum vacuum in the neighborhood of material systems. The model could help resolve the cosmological paradox associated with the ZPE of electromagnetic fields, while reclaiming quantum effects associated with quantum vacuum such as the Casimir effect and the Lamb shift. It also offers a new insight into the Zitterbewegung of material particles

  15. The localized quantum vacuum field

    Energy Technology Data Exchange (ETDEWEB)

    Dragoman, D [Physics Department, University of Bucharest, PO Box MG-11, 077125 Bucharest (Romania)], E-mail: danieladragoman@yahoo.com

    2008-03-15

    A model for the localized quantum vacuum is proposed in which the zero-point energy (ZPE) of the quantum electromagnetic field originates in energy- and momentum-conserving transitions of material systems from their ground state to an unstable state with negative energy. These transitions are accompanied by emissions and re-absorptions of real photons, which generate a localized quantum vacuum in the neighborhood of material systems. The model could help resolve the cosmological paradox associated with the ZPE of electromagnetic fields, while reclaiming quantum effects associated with quantum vacuum such as the Casimir effect and the Lamb shift. It also offers a new insight into the Zitterbewegung of material particles.

  16. Steam generator life-management, reliability, maintenance and refurbishment

    International Nuclear Information System (INIS)

    Spekkens, P.

    2012-01-01

    SGC 2012 is a different kind of a conference - it has its own focus, initiatives and objectives and differs from its predecessors. It originated as the Steam Generator and Heat Exchanger Conference in 1990 - a time when premature degradation of steam generators with Alloy 600 tubes was rampant world-wide, and some CANDU steam generators had started to experience significant fouling and corrosion issues. The six previous steam generator conferences were held on a regular cycle, in a very similar format and with a similar theme. We are now in a different era in steam generators. The Alloy 600 tubing has been largely replaced by more robust materials, and the CANDU steam generators have been brought under much more intense and effective life cycle management. Performance of steam generators has improved greatly, and they are no longer considered at risk of limiting the life of the units. Indeed, most Incoloy 800 steam generators in CANDU units are considered to be capable of operating reliably through the 'second life' of the units and are not being replaced during refurbishments. Given this changing environment, the scope of this conference has been expanded from one to three areas: steam generators and heat exchangers as before, but also; controls, valves and pumps, and; reactor components and systems, Programs A, B and C, respectively. The conference is targeting to address the needs and interests of the operating utilities, and to 'focus on what needs attention'. As a means of 'focusing on what needs attention' an 'Issue-Identification and Definition' program was initiated last winter. The Issue-Identification Team operating with COG President Bob Morrison as its Executive Lead, worked to identify issues requiring attention in the three areas of interest. Of the many issues identified by the Team and elaborated on by the Program Developers of this conference, four were recommended for special attention: A. 'Operate Clean - Build Clean - Plant Wide': Despite their

  17. Vacuum system for the Argonne 6 GeV synchrotron light source

    International Nuclear Information System (INIS)

    Wehrle, R.; Moenich, J.

    1985-01-01

    The ANL vacuum system for the 6 GeV light source storage ring features non-evaporable strip getter pumps for uniform pumping around the ring within a gas desorption antechamber, and it also features lumped getter pumping directly under and above crotch radiation absorbers that are positioned after each bending magnet. Based on experiments at ANL in 1980 and by others, the technical and economical advantages have been established for the use of the distributed NeG pumps of non-magnetic strips coated with a non-evaporable Zr Al getter matrix. The NeG strip pump lifetime approaches ten years. The antechamber improves the isolation of the gas desorption process from the main beam chamber and beam. The combination of these vacuum techniques; the NeG strip getter pumps, the gas desorption antechambers, and the lumped ion and lumped getter pumping provide a unique and reliable system for maintaining long beam lifetime

  18. Cold Vacuum Drying facility effluent drain system design description

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) effluent drain system (EFS). The primary function of the EFS is to collect and transport fire suppression water discharged into a CVDF process bay to a retention basin located outside the facility. The EFS also provides confinement of spills that occur inside a process bay and allows non-contaminated water that drains to the process bay sumps to be collected until sampling and analysis are complete

  19. Building materials and systems with vacuum insulation panels for external walls; Bauelemente und Systeme mit VIP fuer Aussenwandkonstruktionen - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Binz, A; Steinke, G

    2007-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at materials and systems using vacuum insulation panels (VIP) for the construction of external walls. The aim of this research project was the development, practical use and market introduction of VIP systems that take account of the special properties of VIP. Along with partners in industry, applications involving external and internal insulation were examined. The need for protecting the vacuum panels against mechanical damage is stressed. The specific needs for the protection of external and internal applications are discussed. The dynamic developments in this relatively new area are commented on. Various mounting systems are examined and commented on. The thermal properties of such insulation systems and applications are noted and commented on.

  20. Cold Vacuum Drying facility civil - structural system design description (SYS 06)

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying (CVD) Facility civil - structural system. This system consists of the facility structure, including the administrative and process areas. The system's primary purpose is to provide for a facility to house the CVD process and personnel and to provide a tertiary level of containment. The document provides a description of the facility and demonstrates how the design meets the various requirements imposed by the safety analysis report and the design requirements document

  1. Spent nuclear fuel project cold vacuum drying facility tempered water and tempered water cooling system design description

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    1998-01-01

    This document provides the System Design Description (SDD) for the Cold Vacuum Drying Facility (CVDF) Tempered Water (TW) and Tempered Water Cooling (TWC) System . The SDD was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998), The HNF-SD-SNF-DRD-O02, 1998, Cold Vacuum Drying Facility Design Requirements, and the CVDF Design Summary Report. The SDD contains general descriptions of the TW and TWC equipment, the system functions, requirements and interfaces. The SDD provides references for design and fabrication details, operation sequences and maintenance. This SOD has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  2. RA Reactor operation and maintenance (I-IX), part VI, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora (I-IX), VI Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the period planned for maintenance and refurbishment of the RA reactor the gas reactor system including the ventilation system was inspected and tested, the components were cleaned. This report describes detailed instructions and actions concerning repair and decontamination of the gas and ventilation systems components.

  3. Simulations and Vacuum Tests of a CLIC Accelerating Structure

    CERN Document Server

    Garion, C

    2011-01-01

    The Compact LInear Collider, under study, is based on room temperature high gradient structures. The vacuum specificities of these cavities are low conductance, large surface areas and a non-baked system. The main issue is to reach UHV conditions (typically 10-7 Pa) in a system where the residual vacuum is driven by water outgassing. A finite element model based on an analogy thermal/vacuum has been built to estimate the vacuum profile in an accelerating structure. Vacuum tests are carried out in a dedicated set-up, the vacuum performances of different configurations are presented and compared with the predictions.

  4. R&D ERL: Vacuum

    Energy Technology Data Exchange (ETDEWEB)

    Mapes, M.; Smart, L.; Weiss, D.; Steszyn, A.; Todd, R.

    2010-01-01

    The ERL Vacuum systems are depicted in a figure. ERL has eight vacuum volumes with various sets of requirements. A summary of vacuum related requirements is provided in a table. Five of the eight volumes comprise the electron beamline. They are the 5-cell Superconducting RF Cavity, Superconducting e-gun, injection, loop and beam dump. Two vacuum regions are the individual cryostats insulating the 5-cell Superconducting RF Cavity and the Superconducting e-gun structures. The last ERL vacuum volume not shown in the schematic is the laser transport line. The beamline vacuum regions are separated by electropneumatic gate valves. The beam dump is common with loop beamline but is considered a separate volume due to geometry and requirements. Vacuum in the 5-cell SRF cavity is maintained in the {approx}10{sup -9} torr range at room temperature by two 20 l/s ion pumps and in the e-gun SRF cavity by one 60 l/s ion pump. Vacuum in the SRF cavities operated at 2{sup o}K is reduced to low 10{sup -11} torr via cryopumping of the cavity walls. The cathode of the e-gun must be protected from poisoning, which can occur if vacuum adjacent to the e-gun in the injection line exceeds 10-11 torr range in the injection warm beamline near the e-gun exit. The vacuum requirements for beam operation in the loop and beam dump are 10-9 torr range. The beamlines are evacuated from atmospheric pressure to high vacuum level with a particulate free, oil free turbomolecular pumping cart. 25 l/s shielded ion pumps distributed throughout the beamlines maintain the vacuum requirement. Due to the more demanding vacuum requirement of the injection beamline proximate to the e-gun, a vacuum bakeout of the injection beamline is required. In addition, two 200 l/s diode ion pumps and supplemental pumping provided by titanium sublimation pumps are installed in the injection line just beyond the exit of the e-gun. Due to expected gas load a similar pumping arrangement is planned for the beam dump. The

  5. Safety and operational aspects in in-situ electrical baking of large vacuum systems of Indus accelerators

    International Nuclear Information System (INIS)

    Bhatnagar, Prateek; Bhange, Nilesh; Joshi, Sujata; Sridhar, R.

    2016-01-01

    In order to achieve pressures in UHV (Ultra High Vacuum) range, the vacuum chambers and associated vacuum components, necessarily made of UHV compatible materials, should be baked sufficiently long enough so as to reduce outgassing rates. The baking period usually ranges from 48 hours to 72 hours for an electrical load of more than 30 kW per sector, in which baking temperatures, a characteristic parameter and specific to material, range from 150°C-180°C for Aluminium alloy and 250°C-300°C for SS (stainless steel). Indus accelerators vacuum installations include more than 300 m long vacuum chamber which are subjected to rigorous, standardized and labour intensive electrical baking procedure involving an intelligent ON-OFF distributed temperature control system with in-built defence of electrical safety and expandability as per the needs. The paper discusses various in built electrical safely features, operational aspects, work practices and challenges involved in accomplishing an interrupt free continuous electrical baking for distributed electrical load of more than 30 kW for a typical vacuum segment of Indus accelerator. (author)

  6. A Guide to Energy Efficient Refurbishment. Maintenance and Renewal in Educational Buildings. Building Bulletin 73.

    Science.gov (United States)

    Department for Education and Employment, London (England). Architects and Building Branch.

    With little or relatively modest investment, schools being refurbished or undergoing maintenance can make disproportionately large gains in energy efficiency that can also result in large financial savings. This document offers guidance on the selection of appropriate measures that can improve a facility's energy efficiency, depending on the type…

  7. Vacuum chamber-free centrifuge with magnetic bearings.

    Science.gov (United States)

    Park, Cheol Hoon; Kim, Soohyun; Kim, Kyung-Soo

    2013-09-01

    Centrifuges are devices that separate particles of different densities and sizes through the application of a centrifugal force. If a centrifuge could be operated under atmospheric conditions, all vacuum-related components such as the vacuum chamber, vacuum pump, diffusion pump, and sealing could be removed from a conventional centrifuge system. The design and manufacturing procedure for centrifuges could then be greatly simplified to facilitate the production of lightweight centrifuge systems of smaller volume. Furthermore, the maintenance costs incurred owing to wear and tear due to conventional ball bearings would be eliminated. In this study, we describe a novel vacuum chamber-free centrifuge supported by magnetic bearings. We demonstrate the feasibility of the vacuum chamber-free centrifuge by presenting experimental results that verify its high-speed support capability and motoring power capacity.

  8. Gas-kinetic analysis of multicomponent vacuum systems by the method of equivalent surfaces

    International Nuclear Information System (INIS)

    Ershov, B.D.; Sakaganskii, G.L.

    A method is proposed for the analysis of molecular flows in complicated vacuum systems. Essentially, it involves the transposition of solutions for a number of elemental structural components. The basic analytic relationships and tables are given and the method is illustrated by analyzing a specific system

  9. Refurbishment of the rotating rack of the OSU TRIGA MKII reactor

    International Nuclear Information System (INIS)

    Higginbotham, J.F.; Dodd, B.; Pratt, D.S.; Anderson, T.V.

    1992-01-01

    Many TRIGA reactors have experienced operational difficulties with the rotating racks used for sample irradiation. Generally the rack gradually becomes more difficult to rotate until it finally seizes. The recommended action at that point is replacement of the entire facility at a significant cost. The purpose of this paper is to describe the symptoms leading to rack failure and to present the results of a refurbishment procedure that does not involve the use of solvents which create mixed chemical and radioactive hazardous waste. The primary reason for rack failure is the buildup of sludge produced through irradiation of lubrication oil. The refurbishment procedure involves using a commercially available degreasing solution which can be pumped into and out of the rack with the objective of removing this sludge. The solution used is sold under the trade name 'Simple Green'. No radioactive material was detected on smear or air samples taken of the work area during the reifurbishment activities and the rack rotates freely in both direction even after eighteen months of operation. The only disadvantage to performing this procedure has been the need to maintain a very aggressive contamination control program when unloading samples from the rack. A very fine particulate material attaches to the outside of tubes used to encapsulate samples. This material can produce contamination levels of 10,000 dpm/100 cm 2 in the worst cases but will typically produce local hot spots on the order of 1000 dpm. (author)

  10. Vacuum technology in the chemical industry

    CERN Document Server

    Jorisch, Wolfgang

    2015-01-01

    Based on the very successful German edition and a seminar held by the German Engineers` Association (VDI) on a regular basis for years now, this English edition has been thoroughly updated and revised to reflect the latest developments. It supplies in particular the special aspects of vacuum technology, applied vacuum pump types and vacuum engineering in the chemical, pharmaceutical and process industry application-segments. The text includes chapters dedicated to latest European regulations for operating in hazardous zones with vacuum systems, methods for process pressure control and regulati

  11. Ultra-high vacuum technology for accelerators

    CERN Multimedia

    CERN. Geneva. Audiovisual Unit; Hilleret, Noël; Strubin, Pierre M

    2002-01-01

    The lectures will start with a review of the basics of vacuum physics required to build Ultra High Vacuum (UHV) systems, such as static and dynamic outgassing. Before reviewing the various pumping and measurement devices, including the most modern one like Non Evaporable Getter (NEG) coatings, an overview of adequate materials to be used in UHV systems will be given together with their treatment (e.g. cleaning procedures and bake out). Practical examples based on existing or future accelerators will be used to illustrate the topics. Finally, a short overview of modern vacuum controls and interlocks will be given.

  12. Cryogenic thermal storage system for discontinuous industrial vacuum processes

    Directory of Open Access Journals (Sweden)

    Scaringella M.

    2012-10-01

    Full Text Available Phase Change Materials are proposed for refrigerating systems in discontinuous industrial vacuum processes where temperatures as low as −140 ÷ −100°C are necessary within time-frames representing 10÷20% of total operating time. An application is proposed for cooling systems used in a Physical Vapour Deposition (PVD apparatus. A prototype has been manufactured which couples a cryopump with a reservoir filled with MethylCycloPentane (MCP-C6H12 and a distribution line where nitrogen in the gaseous state is flowing. Preliminary tests show that temperatures of about −120°C are actually achieved within time windows compatible with PVD applications.

  13. Vacuum Technology for Superconducting Devices

    Energy Technology Data Exchange (ETDEWEB)

    Chiggiato, P [European Organization for Nuclear Research, Geneva (Switzerland)

    2014-07-01

    The basic notions of vacuum technology for superconducting applications are presented, with an emphasis on mass and heat transport in free molecular regimes. The working principles and practical details of turbomolecular pumps and cryopumps are introduced. The specific case of the Large Hadron Collider’s cryogenic vacuum system is briefly reviewed.

  14. Renewable-based low-temperature district heating for existing buildings in various stages of refurbishment

    DEFF Research Database (Denmark)

    Brand, Marek; Svendsen, Svend

    2013-01-01

    Denmark is aiming for a fossil-free heating sector for buildings by 2035. Judging by the national heating plan, this will be achieved mainly by a further spread of DH (district heating) based on the renewable heat sources. To make the most cost-effective use of these sources, the DH supply...... and, for 98% of the year, to below 60 °C. However for the temperatures below 60 °C a low-temperature DH substation is required for DHW (domestic hot water) heating. This research shows that renewable sources of heat can be integrated into the DH system without problems and contribute to the fossil...... temperature should be as low as possible. We used IDA–ICE software to simulate a typical Danish single-family house from the 1970s connected to DH at three different stages of envelope and space heating system refurbishment. We wanted to investigate how low the DH supply temperature can be without reducing...

  15. Vacuum system design and performance for the Daresbury HBL

    International Nuclear Information System (INIS)

    Reid, R.J.

    1988-01-01

    This paper reports on the vacuum performance of an electron storage ring dedicated to the production of synchrotron radiation which is characterized in terms of the single parameter electron beam lifetime at the working current of the machine. The Daresbury SRS had performed satisfactorily in this respect over much of its working life, with lifetimes in excess of 10 hours at 300 mA stored current at a beam energy of 2 GeV. When the decision was taken to upgrade the performance of the machine by increasing the source brilliance, it was important that this performance should continue. However, it was clear that apertures - and hence gas flow conductances - in some of the new vacuum chambers were very restricted. Thus it was by no means obvious that the requisite vacuum levels (approx. 10 -7 Pascal) could be obtained given the engineering constraints on the possible location and physical size of suitable vacuum pumps. Extensive and detailed calculations were therefore carried out using a finite-element type of analysis to compute pressure profiles in the proposed machine, with the vacuum pumps being treated as semi-free parameters. A suitable scheme was evolved, and has proved satisfactory, with beam lifetimes of 24 hours at 200 mA stored beam at 2 GeV being regularly achieved. These lifetimes are in excess of the anticipated values, and this is discussed

  16. Cold Vacuum Drying facility heating, ventilation, and Air Conditioning system design description

    International Nuclear Information System (INIS)

    SINGH, G.

    2000-01-01

    This System Design Description (SDD) addresses the HVAC system for the CVDF. The CVDF HVAC system consists of five subsystems: (1) Administration building HVAC system; (2) Process bay recirculation HVAC system; (3) Process bay local exhaust HVAC and process vent system; (4) Process general supply/exhaust HVAC system; and (5) Reference air system. The HVAC and reference air systems interface with the following systems: the fire protection control system, Monitoring and Control System (MCS), electrical power distribution system (including standby power), compressed air system, Chilled Water (CHW) system, drainage system, and other Cold Vacuum Drying (CVD) control systems not addressed in this SDD

  17. Gentilly-2 refurbishment pre-project

    International Nuclear Information System (INIS)

    Pageau, Rene; Doyon, Martial; Rheaume, M.R.

    2002-01-01

    The conceptual design life of Gentilly-2 station is 30 years and the station was put in service in 1982. Hydro-Quebec has initiated a project to assess the refurbishment of the station in the horizon 2008-2010 and for an expected life extension of 25 years. The reactor has been successfully operated since its first full-power operation in early 80's, nearly 20 years ago. Although the overall performance of Gentilly-2 continues to be very good, it is reasonable to expect that age-related degradation of key plant components will have an increasing impact on operations as the plant continues to age. The replacement of the reactor channels component is required around 2008-2009. The replacement of the reactor tubes is a major activity and it is necessary to assess the capability of the station to operate safely and reliably for a an extended period of 25 years bringing the design life of the station to over 50 years. The challenges associated with extended life operation until at least 2030-33 horizon are to maintain the margin of safety for plant operations by ensuring reliability of safety-related systems, to reduce plant unavailability due to age-related component failures, and to minimize the costs for repairs and replacement of aging components. As shown on the next figure, the overall project is expected to spread over an 8 years period starting in 2001. A project feasibility study (phase-1) of four (4) years has been planned to assess the plant condition and to make an overall safety review. This project phase will confirm the economical viability of extended operation. A period of thirty-nine (39) months would be necessary for the procurement and manufacturing of all the reactor components, and for the engineering work related to safety and economic improvements. Reactor channel replacement is planned for an outage not exceeding 18 months. (author)

  18. On Stakeholders and the Decision Making Process Concerning Sustainable Renovation and Refurbishment in Sweden, Denmark and Cyprus

    DEFF Research Database (Denmark)

    Gohardani, Navid; Björk, Folke; Jensen, Per Anker

    2013-01-01

    This article examines the decision making process related to sustainable renovation and refurbishment in buildings. The utilized methodology identifies three distinct phases in order to instigate an engagement in sustainable renovation, by means of questionnaires and semi-structured interviews...

  19. Vacuum distillation/vapor filtration water recovery

    Science.gov (United States)

    Honegger, R. J.; Neveril, R. B.; Remus, G. A.

    1974-01-01

    The development and evaluation of a vacuum distillation/vapor filtration (VD/VF) water recovery system are considered. As a functional model, the system converts urine and condensates waste water from six men to potable water on a steady-state basis. The system is designed for 180-day operating durations and for function on the ground, on zero-g aircraft, and in orbit. Preparatory tasks are summarized for conducting low gravity tests of a vacuum distillation/vapor filtration system for recovering water from urine.

  20. Development of a vacuum superinsulation panel

    Energy Technology Data Exchange (ETDEWEB)

    Timm, H; Seefeldt, D; Nitze, C

    1983-05-01

    After completion of the investigations the vacuum-insulated panel is available as prototype. The aim of the investigations was to optimize and to finalize the vacuum superinsulation system with regard to a pressure-resistant, temperature-resistant thermal insulation of high efficiency. In this connection, particularly investigations with regard to vacuum-tight sealing, compression and evacuation of powder filling as well as special material investigations were performed. The application-specific utilization of the vacuum-insulated panel and the adjustment to special operational conditions can now be started. Application possibilities are at present seen in coverings or linings with high temperature and/or pressure requirements.

  1. Design of the MFTF external vacuum system

    International Nuclear Information System (INIS)

    Holl, P.M.

    1979-01-01

    As a result of major experiment success in the LLL mirror program on start-up and stabilization of plasmas in minimum-B magnetic geometry, a Mirror Fusion Test Facility (MFTF) is under construction. Completion is scheduled for September, 1981. MFTF will be used to bridge the gap between present day small mirror experiments and future fusion-reactor activity based on magnetic mirrors. The focal point of the Mirror Fusion Test Facility is the 35 foot diameter by 60 foot long vacuum vessel which encloses the superconducting magnets. High vacuum conditions in the vessel are required to establish and maintain a plasma, and to create and deliver energetic neutral atoms to heat the plasma at the central region

  2. 40 CFR 1065.644 - Vacuum-decay leak rate.

    Science.gov (United States)

    2010-07-01

    ... criterion specified in § 1065.345(e). ER06MY08.028 Where: V vac = geometric volume of the vacuum-side of the sampling system. R = molar gas constant. p 2 = Vacuum-side absolute pressure at time t2. T 2 = Vacuum-side...

  3. The NNR requirements to address modification, modernization, refurbishment and ageing management

    International Nuclear Information System (INIS)

    Thugwane, Samuel

    2013-01-01

    The National Nuclear Regulator (NNR) is a national competent authority in South African which has been mandated under Act 47 of 1999 to provide for the protection of property people and environment. The NNR achieves its mandated by issuing Nuclear Authorisations in case of Nuclear Installations and Certificate of registration for the mining industry. Currently SAFARI-1 Research Reactor at Pelindaba site is the only Research Reactor that is licensed by NNR through a Process based licensing. SAFARI-1 is a 20 MW research reactor and has been in operation since 1965 and is approaching its full lifetime. Regular, periodic and systematic examination, inspection, maintenance and testing of all plant, systems, structures and components have been developed and implemented. Modification and refurbishment has been implemented over years since its construction. Ageing of structural components and obsolescence is now becoming a challenge; as a result, Ageing Management Programme has been developed to address these issues. In accordance with the NNR requirements any modification that the licensee plan to implement, must comply with NNR approved processes and procedures relating to control of such modification to the design of existing plant, facility or system design, including modifications that may be of a temporary nature

  4. The NNR requirements to address modification, modernization, refurbishment and ageing management

    Energy Technology Data Exchange (ETDEWEB)

    Thugwane, Samuel [National Nuclear Regulator, Pretoria (South Africa)

    2013-07-01

    The National Nuclear Regulator (NNR) is a national competent authority in South African which has been mandated under Act 47 of 1999 to provide for the protection of property people and environment. The NNR achieves its mandated by issuing Nuclear Authorisations in case of Nuclear Installations and Certificate of registration for the mining industry. Currently SAFARI-1 Research Reactor at Pelindaba site is the only Research Reactor that is licensed by NNR through a Process based licensing. SAFARI-1 is a 20 MW research reactor and has been in operation since 1965 and is approaching its full lifetime. Regular, periodic and systematic examination, inspection, maintenance and testing of all plant, systems, structures and components have been developed and implemented. Modification and refurbishment has been implemented over years since its construction. Ageing of structural components and obsolescence is now becoming a challenge; as a result, Ageing Management Programme has been developed to address these issues. In accordance with the NNR requirements any modification that the licensee plan to implement, must comply with NNR approved processes and procedures relating to control of such modification to the design of existing plant, facility or system design, including modifications that may be of a temporary nature.

  5. Leybold vacuum handbook

    CERN Document Server

    Diels, K; Diels, Kurt

    1966-01-01

    Leybold Vacuum Handbook presents a collection of data sets that are essential for numerical calculation of vacuum plants and vacuum processes. The title first covers vacuum physics, which includes gas kinetics, flow phenomena, vacuum gauges, and vapor removal. Next, the selection presents data on vacuum, high vacuum process technology, and gas desorption and gettering. The text also deals with materials, vapor pressure, boiling and melting points, and gas permeability. The book will be of great interest to engineers and technicians that deals with vacuum related technologies.

  6. The vacuum in non-inertial systems

    International Nuclear Information System (INIS)

    Soto, F.; Cocho, G.; Villarreal, C.; Hacyan, S.; Sarmiento, A.

    1987-01-01

    A brief presentation of the attemps made by our group on understanding the physics of the thermal effects appearing in quantum field theory in the non-inertial frames or in curved spacetime is made. The idea of the vacuum field being directly responsible for the thermal effects in non-inertial frames is introduced and explored; the thermal distributions observed from a non-inertial frame are due to the Doppler distortion undergone by the vacuum field. To support this idea we use the results obtained by T.H. Boyer in stochastic field theory, and further on we develop a formalism which leads to consistent results. We also show that the thermal character of the denominators in the distributions, appearing in quantum field theory in non-inertia frames, is directly linked to the discreteness originated by confining the space where the field is being quantized. This confinement implies the absence of some long wave modes, which in turn implies a modification of the states density in phase space. (author)

  7. Modifications in the vacuum loop of the distillation system - Annex 7; Prilog 7 - Izmene u vakuumskoj grani destilacionog sistema

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1964-12-15

    The heavy water distillation system is foreseen to operate in a continuous regime during reactor operation. The vacuum loop is designed to achieve absolute pressure of 70 mmHg in the evaporator. Modifications in the vacuum loop of the distillation system were necessary in order to attain good efficiency of the distillation, i.e clean heavy water coolant.

  8. Vacuum horizontal drainage for depressurization of uranium tailings

    International Nuclear Information System (INIS)

    Pakalnis, R.; Chedsey, G.; Robertson, A.M.; Follin, S.

    1985-01-01

    A recent advance in tailings slope depressurization is the application of vacuum assist horizontal drainage. Horizontal drains have been used for several decades to reduce water pressures in slopes in order to improve stability. The benefit from vacuum assist arises from an increased hydraulic gradient caused by induced negative atmospheric pressures. The vacuum assist system has, since its inception in 1982, been successfully employed at two soil and four rock slope projects located in Western Canada. This paper describes the first application of this system in the United States. The technical feasibility of employing vacuum assisted horizontal drains to depressurize a uranium tailings dam near Riverton, Wyoming has been evaluated. Two horizontal drains (300 ft.) were installed and their effect monitored by nine piezometers. The study was conducted over a three-week internal with vacuum being applied for three and four day periods. The drawdowns achieved through vacuum drainage was found to be approximately double that obtained by gravity alone. The volume of water exhausted under vacuum during the seven day interval was approximately double that obtained by gravity alone

  9. Vacuum-induced quantum memory in an opto-electromechanical system

    Science.gov (United States)

    Qin, Li-Guo; Wang, Zhong-Yang; Wu, Shi-Chao; Gong, Shang-Qing; Ma, Hong-Yang; Jing, Jun

    2018-03-01

    We propose a scheme to implement electrically controlled quantum memory based on vacuum-induced transparency (VIT) in a high-Q tunable cavity, which is capacitively coupled to a mechanically variable capacitor by a charged mechanical cavity mirror as an interface. We analyze the changes of the cavity photons arising from vacuum-induced-Raman process and discuss VIT in an atomic ensemble trapped in the cavity. By slowly adjusting the voltage on the capacitor, the VIT can be adiabatically switched on or off, meanwhile, the transfer between the probe photon state and the atomic spin state can be electrically and adiabatically modulated. Therefore, we demonstrate a vacuum-induced quantum memory by electrically manipulating the mechanical mirror of the cavity based on electromagnetically induced transparency mechanism.

  10. Calculation of pressure distribution in vacuum systems using a commercial finite element program

    International Nuclear Information System (INIS)

    Howell, J.; Wehrle, B.; Jostlein, H.

    1991-01-01

    The finite element method has proven to be a very useful tool for calculating pressure distributions in complex vacuum systems. A number of finite element programs have been developed for this specific task. For those who do not have access to one of these specialized programs and do not wish to develop their own program, another option is available. Any commercial finite element program with heat transfer analysis capabilities can be used to calculate pressure distributions. The approach uses an analogy between thermal conduction and gas conduction with the quantity temperature substituted for pressure. The thermal analogies for pumps, gas loads and tube conductances are described in detail. The method is illustrated for an example vacuum system. A listing of the ANSYS data input file for this example is included. 2 refs., 4 figs., 1 tab

  11. UHV testing of upgraded vacuum chambers for Indus-1

    International Nuclear Information System (INIS)

    Sindal, B.K.; Kumar, K.V.A.N.P.S.; Ramshiroman; Bhange, Nilesh; Yadav, D.P.; Sridhar, R.; Shukla, S.K.

    2013-01-01

    Indus-1 is a 450 MeV, 100 mA dedicated electron storage ring operating at pressure 10 -10 mbar range without beam and 10 -9 mbar range with beam using triode sputter ion pump (SIP) and titanium sublimation pump (TSP) combination. Indus-1 storage ring is presently working with six operational beam lines installed at three bending magnets. To accommodate two more beam lines and to reduce number of demountable joints, up-gradation of Indus-1 UHV system was planned. Salient features of upgraded vacuum system are bending magnet vacuum chambers with one extra port for additional beam line and straight section vacuum chambers with integrated TSP body. Half of the Indus-1 storage ring vacuum envelope with two bending magnet vacuum chamber and six straight section vacuum chambers were assembled with pumps, gauges etc, leak tested and tested for its UHV performance. Ultimate vacuum 5x10 -10 mbar with SIP and 2x10 -10 mbar after TSP pumping were achieved. Residual gas analyser (RGA) spectrum recorded for residual gas analysis indicated the imprints of a typical all metal UHV system having H 2 as major gas. This paper describes UHV testing of upgraded, newly fabricated vacuum chambers for Indus-1 storage ring. (author)

  12. Compressed Air/Vacuum Transportation Techniques

    Science.gov (United States)

    Guha, Shyamal

    2011-03-01

    General theory of compressed air/vacuum transportation will be presented. In this transportation, a vehicle (such as an automobile or a rail car) is powered either by compressed air or by air at near vacuum pressure. Four version of such transportation is feasible. In all versions, a ``c-shaped'' plastic or ceramic pipe lies buried a few inches under the ground surface. This pipe carries compressed air or air at near vacuum pressure. In type I transportation, a vehicle draws compressed air (or vacuum) from this buried pipe. Using turbine or reciprocating air cylinder, mechanical power is generated from compressed air (or from vacuum). This mechanical power transferred to the wheels of an automobile (or a rail car) drives the vehicle. In type II-IV transportation techniques, a horizontal force is generated inside the plastic (or ceramic) pipe. A set of vertical and horizontal steel bars is used to transmit this force to the automobile on the road (or to a rail car on rail track). The proposed transportation system has following merits: virtually accident free; highly energy efficient; pollution free and it will not contribute to carbon dioxide emission. Some developmental work on this transportation will be needed before it can be used by the traveling public. The entire transportation system could be computer controlled.

  13. GES [Ground Engineering System] test site preparation

    International Nuclear Information System (INIS)

    Cox, C.M.; Mahaffey, M.K.; Miller, W.C.; Schade, A.R.; Toyoda, K.G.

    1987-10-01

    Activities are under way at Hanford to convert the 309 containment building and its associated service wing to a nuclear test facility for the Ground Engineering System (GES) test. Conceptual design is about 80% complete, encompassing facility modifications, a secondary heat transport system, a large vacuum system, a test article cell and handing system, control and data handling systems, and safety andl auxiliary systems. The design makes extensive use of existing equipment to minimize technical risk and cost. Refurbishment of this equipment is 25% complete. Cleanout of some 1000 m 3 of equipment from the earlier reactor test in the facility is 85% complete. An Environmental Assessment was prepared and revised to incorporate Department of Energy (DOE) comments. It is now in the DOE approval chain, where a Finding of No Significant Impact is expected. During the next year, definite design will be well advanced, long-lead procurements will be initiated, construction planning will be completed, an operator training plan will be prepared, and the site (preliminary) safety analysis report will be drafted

  14. R and D ERL: Vacuum

    International Nuclear Information System (INIS)

    Mapes, M.; Smart, L.; Weiss, D.; Steszyn, A.; Todd, R.

    2010-01-01

    The ERL Vacuum systems are depicted in a figure. ERL has eight vacuum volumes with various sets of requirements. A summary of vacuum related requirements is provided in a table. Five of the eight volumes comprise the electron beamline. They are the 5-cell Superconducting RF Cavity, Superconducting e-gun, injection, loop and beam dump. Two vacuum regions are the individual cryostats insulating the 5-cell Superconducting RF Cavity and the Superconducting e-gun structures. The last ERL vacuum volume not shown in the schematic is the laser transport line. The beamline vacuum regions are separated by electropneumatic gate valves. The beam dump is common with loop beamline but is considered a separate volume due to geometry and requirements. Vacuum in the 5-cell SRF cavity is maintained in the ∼10 -9 torr range at room temperature by two 20 l/s ion pumps and in the e-gun SRF cavity by one 60 l/s ion pump. Vacuum in the SRF cavities operated at 2 o K is reduced to low 10 -11 torr via cryopumping of the cavity walls. The cathode of the e-gun must be protected from poisoning, which can occur if vacuum adjacent to the e-gun in the injection line exceeds 10-11 torr range in the injection warm beamline near the e-gun exit. The vacuum requirements for beam operation in the loop and beam dump are 10-9 torr range. The beamlines are evacuated from atmospheric pressure to high vacuum level with a particulate free, oil free turbomolecular pumping cart. 25 l/s shielded ion pumps distributed throughout the beamlines maintain the vacuum requirement. Due to the more demanding vacuum requirement of the injection beamline proximate to the e-gun, a vacuum bakeout of the injection beamline is required. In addition, two 200 l/s diode ion pumps and supplemental pumping provided by titanium sublimation pumps are installed in the injection line just beyond the exit of the e-gun. Due to expected gas load a similar pumping arrangement is planned for the beam dump. The cryostat vacuum thermally

  15. RELATION BETWEEN FUNCTION AND FORM IN VACUUM CLEANERS DESIGN

    Directory of Open Access Journals (Sweden)

    RADU Ștefan

    2015-11-01

    Full Text Available The paper analyses how robotic vacuum cleaner works, describing their cleaning capabilities and additional features. The paper illustrates advantages of using robotic vacuum cleaners that have intelligent programming and a vacuum cleaning system, the components of a robotic vacuum cleaner. The paper develops aspects concerning to create 2D scale models for the evaluation of specific features of the new components for a prototype robotic vacuum cleaner.

  16. ITER - torus vacuum pumping system remote handling issues

    International Nuclear Information System (INIS)

    Stringer, J.

    1992-11-01

    This report describes further design issues concerning remote maintenance of torus vacuum pumping systems options for ITER. The key issues under investigation in this report are flask support systems for valve seal exchange operations for the compound cryopump scheme and remote maintenance of a proposed multiple turbomolecular pump (TMP) system, an alternative ITER torus exhaust pumping option. Previous studies have shown that the overhead support methods for seal exchange flask equipment could malfunction due to valve/flask misalignment. A floor-mounted support system is described in this report. This scheme provides a more rigid support system for seal exchange operations. An alternative torus pumping system, based on the use of multiple TMPs, is studied from a remote maintenance standpoint. In this concept, centre distance spacing for pump/valve assemblies is too restrictive for remote maintenance. Recommendations are made for adequate spacing of these assemblies based on commercially-available 0.8 m and 1.0 m diameter valves. Fewer pumps will fit in this arrangement, which implies a need for larger TMPs. Pumps of this size are not commercially available. Other concerns regarding the servicing and storage of remote handling equipment in cells are also identified. (9 figs.)

  17. Historical evolution toward achieving ultrahigh vacuum in JEOL electron microscopes

    CERN Document Server

    Yoshimura, Nagamitsu

    2014-01-01

    This book describes the developmental history of the vacuum system of the transmission electron microscope (TEM) at the Japan Electron Optics Laboratory (JEOL) from its inception to its use in today’s high-technology microscopes. The author and his colleagues were engaged in developing vacuum technology for electron microscopes (JEM series) at JEOL for many years. This volume presents a summary and explanation of their work and the technology that makes possible a clean ultrahigh vacuum. The typical users of the TEM are top-level researchers working at the frontiers of new materials or with new biological specimens. They often use the TEM under extremely severe conditions, with problems sometimes occurring in the vacuum system of the microscopes. JEOL engineers then must work as quickly as possible to improve the vacuum evacuation system so as to prevent the recurrence of such problems. Among the wealth of explanatory material in this book are examples of users’ reports of problems in the vacuum system of...

  18. Quality Management of CERN Vacuum Controls

    CERN Document Server

    Antoniotti, F; Fortescue-Beck, E; Gama, J; Gomes, P; Le Roux, P; Pereira, H F; Pigny, G

    2014-01-01

    The vacuum controls Section (TE-VSC-ICM) is in charge of the monitoring, maintenance and consolidation of the control systems of all accelerators and detectors in CERN; this represents 6 000 instruments distributed along 128 km of vacuum chambers, often of heterogeneous architectures and of diverse

  19. Safety shield for vacuum/pressure-chamber windows

    Science.gov (United States)

    Shimansky, R. A.; Spencer, R.

    1980-01-01

    Optically-clear shatter-resistant safety shield protects workers from implosion and explosion of vacuum and pressure windows. Plastic shield is inexpensive and may be added to vacuum chambers, pressure chambers, and gas-filling systems.

  20. X-ray lithography source (SXLS) vacuum system

    International Nuclear Information System (INIS)

    Schuchman, J.C.; Aloia, J.; Hsieh, H.; Kim, T.; Pjerov, S.

    1989-01-01

    In 1988 Brookhaven National Laboratory (BNL) was awarded a contract to design and construct a compact light source for x-ray lithography. This award is part of a technology transfer-to-American-industry program. The contract is for an electron storage ring designed for 690 MeV-500 ma operations. It has a racetrack configuration with a circumference to 8.5 meters. The machine is to be constructed in two phases. Phase I (200 MeV-500ma) will primarily be for low energy injection studies and will incorporate all room temperature magnets. For Phase II the two room temperature dipole magnets will be replaced with (4T) superconducting magnets and operation will be at 690 MeV. This paper describes the vacuum system for this machine. 9 refs

  1. Waveguide quantum electrodynamics in squeezed vacuum

    Science.gov (United States)

    You, Jieyu; Liao, Zeyang; Li, Sheng-Wen; Zubairy, M. Suhail

    2018-02-01

    We study the dynamics of a general multiemitter system coupled to the squeezed vacuum reservoir and derive a master equation for this system based on the Weisskopf-Wigner approximation. In this theory, we include the effect of positions of the squeezing sources which is usually neglected in the previous studies. We apply this theory to a quasi-one-dimensional waveguide case where the squeezing in one dimension is experimentally achievable. We show that while dipole-dipole interaction induced by ordinary vacuum depends on the emitter separation, the two-photon process due to the squeezed vacuum depends on the positions of the emitters with respect to the squeezing sources. The dephasing rate, decay rate, and the resonance fluorescence of the waveguide-QED in the squeezed vacuum are controllable by changing the positions of emitters. Furthermore, we demonstrate that the stationary maximum entangled NOON state for identical emitters can be reached with arbitrary initial state when the center-of-mass position of the emitters satisfies certain conditions.

  2. Design of the CLIC Quadrupole Vacuum Chambers

    CERN Document Server

    Garion, C

    2010-01-01

    The Compact Linear Collider, under study, requires vacuum chambers with a very small aperture, of the order of 8 mm in diameter, and with a length up to around 2 m for the main beam quadrupoles. To keep the very tight geometrical tolerances on the quadrupoles, no bake out is allowed. The main issue is to reach UHV conditions (typically 10-9 mbar static pressure) in a system where the vacuum performance is driven by water outgassing. For this application, a thinwalled stainless steel vacuum chamber with two ante chambers equipped with NEG strips, is proposed. The mechanical design, especially the stability analysis, is shown. The key technologies of the prototype fabrication are given. Vacuum tests are carried out on the prototypes. The test set-up as well as the pumping system conditions are presented.

  3. Vacuum energy of the electromagnetic field in a rotating system

    International Nuclear Information System (INIS)

    Hacyan, S.; Sarmiento, A.

    1986-01-01

    The vacuum energy of the electromagnetic field is calculated for a uniformly rotating observer. The spectrum of vacuum fluctuations is composed of the zero-point energy with a modified density of states and a contribution due to the rotation which is not thermal. (orig.)

  4. Refurbishment of small hydropower plants in Romania; Sanierung von Kleinwasserkraftwerken in Rumaenien

    Energy Technology Data Exchange (ETDEWEB)

    Gmeinbauer, Joerg [Wien Energie GmbH, Wien (Austria)

    2010-07-01

    In 2008 Wien Energie subsidiary Wienstrom GmbH participated in three public auctions of Hidroelectrica S.A. for the sale of old small hydro power plants in Romania. Together with strategic partners Wienstrom could successfully compete against local and international competition and acquired 31 small hydro power plants with a total installed capacity of around 20 MW. The plants were integrated into the newly established Vienna Energy Forta Naturala Srl. and are being completely refurbished at the moment. Wien Energie consequently is already the third largest operator of small hydro power plants in Romania. (orig.)

  5. Accelerator tube vacuum conditions in the NSF tandem

    International Nuclear Information System (INIS)

    Groome, A.E.

    1979-08-01

    The Nuclear Structure Facility currently under construction at the Daresbury Laboratory contains a 30 MV tandem Van de Graaff accelerator with a modular design of accelerator tube. The vacuum system requirements are specified to limit beam loss due to charge-state-changing collisions in the residual gas. This report gives an assessment of some of the parameters affecting the vacuum pressure in an operational machine. Measurements are made of the vacuum conductance and outgassing rate of accelerator tube modules. An assessment is made of the effects of temperature rise, beam mis-steering and the presence of suppression magnets on the ultimate vacuum obtainable. Predictions are made of the pressure profile throughout the machine and consideration is given to operational problems such as tube conditioning and temporary loss of pumping. A schematic diagram of the tandem and its vacuum system is shown. (author)

  6. Development and fabrication of the vacuum systems for an elliptically polarized undulator at Taiwan Photon Source

    Science.gov (United States)

    Chang, Chin-Chun; Chan, Che-Kai; Wu, Ling-Hui; Shueh, Chin; Shen, I.-Ching; Cheng, Chia-Mu; Yang, I.-Chen

    2017-05-01

    Three sets of a vacuum system were developed and fabricated for elliptically polarized undulators (EPU) of a 3-GeV synchrotron facility. These chambers were shaped with low roughness extrusion and oil-free machining; the design combines aluminium and stainless steel. The use of a bimetallic material to connect the EPU to the vacuum system achieves the vacuum sealing and to resolve the leakage issue due to bake process induced thermal expansion difference. The interior of the EPU chamber consists of a non-evaporable-getter strip pump in a narrow space to absorb photon-stimulated desorption and to provide a RF bridge design to decrease impedance effect in the two ends of EPU chamber. To fabricate these chambers and to evaluate the related performance, we performed a computer simulation to optimize the structure. During the machining and welding, the least deformation was achieved, less than 0.1 mm near 4 m. In the installation, the linear slider can provide a stable and precision moved along parallel the electron beam direction smoothly for the EPU chamber to decrease the twist issue during baking process. The pressure of the EPU chamber attained less than 2×10-8 Pa through baking. These vacuum systems of the EPU magnet have been installed in the electron storage ring of Taiwan Photon Source in 2015 May and have normally operated at 300 mA continuously since, and to keep beam life time achieved over than 12 h.

  7. Development and fabrication of the vacuum systems for an elliptically polarized undulator at Taiwan Photon Source

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Chin-Chun, E-mail: chinchun@nsrrc.org.tw; Chan, Che-Kai; Wu, Ling-Hui; Shueh, Chin; Shen, I.-Ching; Cheng, Chia-Mu; Yang, I.-Chen

    2017-05-01

    Three sets of a vacuum system were developed and fabricated for elliptically polarized undulators (EPU) of a 3-GeV synchrotron facility. These chambers were shaped with low roughness extrusion and oil-free machining; the design combines aluminium and stainless steel. The use of a bimetallic material to connect the EPU to the vacuum system achieves the vacuum sealing and to resolve the leakage issue due to bake process induced thermal expansion difference. The interior of the EPU chamber consists of a non-evaporable-getter strip pump in a narrow space to absorb photon-stimulated desorption and to provide a RF bridge design to decrease impedance effect in the two ends of EPU chamber. To fabricate these chambers and to evaluate the related performance, we performed a computer simulation to optimize the structure. During the machining and welding, the least deformation was achieved, less than 0.1 mm near 4 m. In the installation, the linear slider can provide a stable and precision moved along parallel the electron beam direction smoothly for the EPU chamber to decrease the twist issue during baking process. The pressure of the EPU chamber attained less than 2×10{sup −8} Pa through baking. These vacuum systems of the EPU magnet have been installed in the electron storage ring of Taiwan Photon Source in 2015 May and have normally operated at 300 mA continuously since, and to keep beam life time achieved over than 12 h.

  8. TPX vacuum vessel transient thermal and stress conditions

    International Nuclear Information System (INIS)

    Feldshteyn, Y.; Dinkevich, S.; Feng, T.; Majumder, D.

    1995-01-01

    The TPX vacuum vessel provides the vacuum boundary for the plasma and the mechanical support for the internal components. Another function of the vacuum vessel is to contain neutron shielding water in the double wall space during normal operation. This double wall space serves as a heat reservoir for the entire vacuum vessel during bakeout. The vacuum vessel and the internal components are subjected to thermal stresses induced by a nonuniform temperature distribution within the structure during bakeout. A successful Conceptual Design Review in March 1993 has established superheated steam as the heating source of the vacuum vessel. A transient bakeout mode of the vacuum vessel and in-vessel components has been analyzed to evaluate transient period duration, proper temperature level, actual thermal stresses and performance of the steam equipment. Thermally, the vacuum vessel structure may be considered as an adiabatic system because it is perfectly insulated by the strong surrounding vacuum and multiple layers of superinsulation. Important aspects of the analysis are described herein

  9. Start-up of Cirus after refurbishment outage and observations during approach to criticality

    International Nuclear Information System (INIS)

    Singh, Tej; Singh, Kanchhi; Sengupta, S.N.

    2004-10-01

    The report presents various physics related aspects of the startup of Cirus reactor after the prolonged refurbishment outage. The special nuclear instrumentation scheme adopted to ensure safe startup of the reactor is described. Salient observations made and physics measurements carried out during various approaches to criticality are covered. One of the significant observations concerned a major reactivity anomaly during the approach to criticality. After due investigations the cause of the anomaly was attributed to the inadvertent wetting of the graphite reflector which houses the reactor regulating and protection system ion chambers. The report also includes salient observations during raising of reactor power to high levels. The wet reflector also resulted in a significant difference measured between the thermal and neutronic power of the reactor. In view of the reactivity anomaly, the core reactivity variation with time was closely followed and compared with computations. As expected the reactivity anomaly reduced gradually with time. (author)

  10. Vacuum production; Produccion de vacio

    Energy Technology Data Exchange (ETDEWEB)

    Segovia, J. L. de

    2010-07-01

    Since the advent of ultra high vacuum in 1958 has been a great demand for new as means of production and to meet the process needs to be done: industry heavy, high technology and space research areas, large accelerator systems particles or nuclear fusion. In this paper we explore the modern media production: dry vacuum pumps, turbo pumps, pump status diffusion ion pumps and cryopumps. (Author)

  11. Cold Vacuum Drying facility condensate collection system design description (SYS 19); FINAL

    International Nuclear Information System (INIS)

    PITKOFF, C.C.

    1999-01-01

    This document describes the Cold Vacuum Drying Facility (CVDF) condensate collection system (CCS). The function of the CCS is to collect cooling coil condensate from air-handling units in the CVDF and to isolate the condensate in collection tanks until the condensate is determined to be acceptable to drain to the effluent drain collection basin

  12. Experimental tests of vacuum energy

    CERN Multimedia

    CERN. Geneva

    2015-01-01

    While the current vacuum energy of the Universe is very small, in our standard cosmological picture it has been much larger at earlier epochs. We try to address the question of what are possible ways to try to experimentally verify this. One direction is to look for systems where vacuum energy constitutes a non-negligible fraction of the total energy, and study the properties of those. Another possibility is to focus on the epochs around cosmic phase transitions, when the vacuum energy is of the same order as the total energy. Along these lines we investigate properties of neutron stars and the imprint of phase transitions on primordial gravitational waves.

  13. Overview of refurbishment project of JMTR

    Energy Technology Data Exchange (ETDEWEB)

    Izumo, Hironobu; Hori, Naohiko; Kaminaga, Masanori; Kusunoki, Tsuyoshi; Ishihara, Masahiro; Komori, Yoshihiro; Suzuki, Masahide; Kawamura, Hiroshi [Japan Atomic Energy Agency, Oarai Research and Development Center, Oarai, Ibaraki (Japan)

    2012-03-15

    The refurbishment project of the JMTR from the beginning of JFY 2007 was promoted with two subjects; the one is the replacement of reactor components, and the other is the construction of new irradiation facilities. On the replacement of reactor components, an investigation on aged components (aged-investigation) was carried out, for concrete structures, tanks, tubes in order to identify their integrity. After the investigation, some components were decided to replace from viewpoints of future maintenance and improvement of reliability. On the construction of new irradiation facilities, corresponding to the user's irradiation request, new irradiation facilities, such as irradiation test facilities and equipments for LWRs materials/fuels, were installed in the JMTR. Furthermore, in June 2010, 'birth of the nuclear techno-park with the JMTR' was selected by Japanese Government. The new project is to install new irradiation facilities, such as irradiation facility and equipments for Mo-99 production and PIE equipments to JMTR until JFY2012. The New JMTR will be utilized fully by wide fields of users. Moreover, the JMTR will also contribute the promotion on research and development of the nuclear energy from basic to applied fields as an internationally utilized facility under the international/Asian network collaborations. (author)

  14. Development of multi-channel high power rectangular RF window for LHCD system employing high temperature vacuum brazing technique

    International Nuclear Information System (INIS)

    Sharma, P K; Ambulkar, K K; Parmar, P R; Virani, C G; Thakur, A L; Joshi, L M; Nangru, S C

    2010-01-01

    A 3.7 GHz., 120 kW (pulsed), lower hybrid current drive (LHCD) system is employed to drive non-inductive plasma current in ADITYA tokamak. The rf power is coupled to the plasma through grill antenna and is placed in vacuum environment. A vacuum break between the pressurized transmission line and the grill antenna is achieved with the help of a multi (eight) channel rectangular RF vacuum window. The phasing between adjacent channels of 8-channel window (arranged in two rows) is important for launching lower hybrid waves and each channel should have independent vacuum window so that phase information is retained. The geometrical parameter of the grill antenna, like periodicity (9mm), channel dimensions (cross sectional dimension of 76mm x 7mm), etc. is to be maintained. These design constraint demanded a development of a multi channel rectangular RF vacuum window. To handle rf losses and thermal effects, high temperature vacuum brazing techniques is desired. Based on the above requirements we have successfully developed a multi channel rectangular rf vacuum window employing high temperature vacuum brazing technique. During the development process we could optimize the chemical processing parameters, brazing process parameters, jigs and fixtures for high temperature brazing and leak testing, etc. Finally the window is tested for low power rf performance using VNA. In this paper we would present the development of the said window in detail along with its mechanical, vacuum and rf performances.

  15. Development of multi-channel high power rectangular RF window for LHCD system employing high temperature vacuum brazing technique

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, P K; Ambulkar, K K; Parmar, P R; Virani, C G; Thakur, A L [Institute for Plasma Research, Bhat, Gandhinagar 382428 (India); Joshi, L M; Nangru, S C, E-mail: pramod@ipr.res.i [Central Electronics Engineering Research Institute, Pilani, Rajasthan 333 031 (India)

    2010-02-01

    A 3.7 GHz., 120 kW (pulsed), lower hybrid current drive (LHCD) system is employed to drive non-inductive plasma current in ADITYA tokamak. The rf power is coupled to the plasma through grill antenna and is placed in vacuum environment. A vacuum break between the pressurized transmission line and the grill antenna is achieved with the help of a multi (eight) channel rectangular RF vacuum window. The phasing between adjacent channels of 8-channel window (arranged in two rows) is important for launching lower hybrid waves and each channel should have independent vacuum window so that phase information is retained. The geometrical parameter of the grill antenna, like periodicity (9mm), channel dimensions (cross sectional dimension of 76mm x 7mm), etc. is to be maintained. These design constraint demanded a development of a multi channel rectangular RF vacuum window. To handle rf losses and thermal effects, high temperature vacuum brazing techniques is desired. Based on the above requirements we have successfully developed a multi channel rectangular rf vacuum window employing high temperature vacuum brazing technique. During the development process we could optimize the chemical processing parameters, brazing process parameters, jigs and fixtures for high temperature brazing and leak testing, etc. Finally the window is tested for low power rf performance using VNA. In this paper we would present the development of the said window in detail along with its mechanical, vacuum and rf performances.

  16. Function and operation of the Doublet III E-coil vacuum breaker system

    International Nuclear Information System (INIS)

    Callis, R.W.; Jackson, G.; DeGrassie, J.; Peterson, P.; LeVine, F.

    1979-11-01

    The ohmic heating system for the Doublet III fusion research device at General Atomic is required to provide the voltage for the initial breakdown phase (there is no preionization) along with the energy to drive the plasma current to a value of 2.5 MA or greater. This requires a peak one turn voltage of 250 volts (16 kV across coil terminals) and a magnetic flux swing of 5 volt-seconds (peak coil current of 110 kA). This voltage and flux swing is accomplished by reverse biasing the ohmic heating coil (E-coil) where, upon reaching a value of 110 ka the coil current is interrupted and commutated into a RC network producing 16 kV across the coil. The interrruption of the E-coil current is accomplished by the use of an array of vacuum circuit breakers (VCB's) and a counter plus network. A description is given of the ohmic heating circuit and the performance of the vacuum circuit breaker array and its counter pulse system

  17. Solution of some pumping problems in the injector vacuum system of the T-20

    International Nuclear Information System (INIS)

    Ershov, B.D.; Karasev, B.G.; Malyshev, I.F.; Saksaganskii, G.L.; Serbrennikov, D.V.; Sorokin, A.G.; Soikin, V.F.; Pustovoit, Yu.M.

    1978-09-01

    The fast neutral deuterium atom injection system in the T-20 includes 8 injectors. In the present paper an analysis is made of the vacuum system of the injectors with 160 keV rated fast atom energy, these being subjected to the largest gas loading. The pumping system for the 80 keV injectors is designed along similar lines. (UK)

  18. Vacuum mechatronics

    Science.gov (United States)

    Hackwood, Susan; Belinski, Steven E.; Beni, Gerardo

    1989-01-01

    The discipline of vacuum mechatronics is defined as the design and development of vacuum-compatible computer-controlled mechanisms for manipulating, sensing and testing in a vacuum environment. The importance of vacuum mechatronics is growing with an increased application of vacuum in space studies and in manufacturing for material processing, medicine, microelectronics, emission studies, lyophylisation, freeze drying and packaging. The quickly developing field of vacuum mechatronics will also be the driving force for the realization of an advanced era of totally enclosed clean manufacturing cells. High technology manufacturing has increasingly demanding requirements for precision manipulation, in situ process monitoring and contamination-free environments. To remove the contamination problems associated with human workers, the tendency in many manufacturing processes is to move towards total automation. This will become a requirement in the near future for e.g., microelectronics manufacturing. Automation in ultra-clean manufacturing environments is evolving into the concept of self-contained and fully enclosed manufacturing. A Self Contained Automated Robotic Factory (SCARF) is being developed as a flexible research facility for totally enclosed manufacturing. The construction and successful operation of a SCARF will provide a novel, flexible, self-contained, clean, vacuum manufacturing environment. SCARF also requires very high reliability and intelligent control. The trends in vacuum mechatronics and some of the key research issues are reviewed.

  19. Vacuum system control for the Heavy Ion Transport Line

    International Nuclear Information System (INIS)

    Stattel, P.; Feigenbaum, I.; Hseuh, H.C.; Robinson, T.; Skelton, R.; Wong, V.

    1987-01-01

    The Brookhaven AGS, 807 m in circumference, and the Tandem Van de Graaff are now joined together by a transport line, 600 m in length. This now allows heavy ions from the Tandem, up to fully stripped sulfur (M = 32) to be transported into the AGS and accelerated to 15 GeV/A. With the addition of a booster between the Tandem and the AGS in the near future, heavy ions such as gold (M = 200) can be accelerated to 30 Z/A GeV/A. This paper describes the HITL (Heavy Ion Transport Line) vacuum control system design and implementation

  20. O-Ring sealing arrangements for ultra-high vacuum systems

    Science.gov (United States)

    Kim, Chang-Kyo; Flaherty, Robert

    1981-01-01

    An all metal reusable O-ring sealing arrangement for sealing two concentric tubes in an ultra-high vacuum system. An O-ring of a heat recoverable alloy such as Nitinol is concentrically positioned between protruding sealing rings of the concentric tubes. The O-ring is installed between the tubes while in a stressed martensitic state and is made to undergo a thermally induced transformation to an austenitic state. During the transformation the O-ring expands outwardly and contracts inwardly toward a previously sized austenitic configuration, thereby sealing against the protruding sealing rings of the concentric tubes.