WorldWideScience

Sample records for utility steam power

  1. Steam power plant

    International Nuclear Information System (INIS)

    Campbell, J.W.E.

    1981-01-01

    This invention relates to power plant forced flow boilers operating with water letdown. The letdown water is arranged to deliver heat to partly expanded steam passing through a steam reheater connected between two stages of the prime mover. (U.K.)

  2. Cycle improvement for nuclear steam power plant

    International Nuclear Information System (INIS)

    Silvestri, G.J. Jr.

    1976-01-01

    A pressure-increasig ejector element is disposed in an extraction line intermediate to a high pressure turbine element and a feedwater heater. The ejector utilizes high pressure fluid from a reheater drain as the motive fluid to increase the pressure at which the extraction steam is introduced into the feedwater heater. The increase in pressure of the extraction steam entering the feedwater heater due to the steam passage through the ejector increases the heat exchange capability of the extraction steam thus increasing the overall steam power plant efficiency

  3. A study on utilization improvement of cogeneration potential in a complex industrial steam and power plant

    International Nuclear Information System (INIS)

    Mierka, O.; Variny, M.

    2012-01-01

    Efficient cogeneration is widely acknowledged as one of measures reducing primary energy use and emissions of greenhouse gases and other pollutants. This contribution bears on analyses of complex industrial power plants, incorporating the concept of exergetic and exergoecomic balances-a concept that has been rarely utilized in Slovakia up to day. Emphasis is laid on synergic use of marginal and exergoecomic analysis, thus assessing the economics of various complex cogeneration units' operational modes. The whole study, together with resulting recommendations for cogeneration efficiency improvement of the given unit is an excerpt of corresponding author's doctoral thesis. (Authors)

  4. A study on utilization improvement of cogeneration potential in a complex industrial steam and power plant

    International Nuclear Information System (INIS)

    Mierka, O.; Variny, M.

    2012-01-01

    Efficient cogeneration is widely acknowledged as one of measures reducing primary energy use and emissions of greenhouse gases and other pollutants. This contribution bears on analyses of complex industrial power plants, incorporating the concept of exergetic and exergoeconomic balances-a concept that has been rarely utilized in Slovakia up to day. Emphasis is laid on synergic use of marginal and exergoeconomic analysis, thus assessing the economics of various complex cogeneration units' operational modes. The whole study, together with resulting recommendations for cogeneration efficiency improvement of the given unit is an excerpt of corresponding author's doctoral thesis. (Authors)

  5. Theoretical-experimental assessment of the variables affecting fretting of Atucha I nuclear power plant utility steam generators tubes

    International Nuclear Information System (INIS)

    Kulichevsky, Raul M.

    1995-01-01

    Fretting wear of Steam Generator tubes caused by flow induced vibrations generates uncertainty on their integrity. The knowledge of the controlling variables of the wear process may give a criterion to evaluate the tubes residual life. Information on vibratory response and dynamic interaction between tubes and their supports are prerequisites for understanding the relationship between fretting wear and tube vibration. Experimental results of the vibratory response of an Atucha-I nuclear power plant type U-tube, the influence of tube/support clearance on this response and a study of tube/support dynamic interaction, which allow the verification of a finite element model of this type of tubes, are presented in this work. Also wear results for the Incoloy 800/DIN 1.4550 austenitic stainless steel pair of materials and a first evaluation of the wear constant of this pair are presented. (author)

  6. Italian steam power plants

    Energy Technology Data Exchange (ETDEWEB)

    von Rautenkranz, J

    1939-01-01

    A brief history of geothermal power production in Italy is presented. Boric acid has been produced on an industrial scale since 1818. The first electrical power was generated in 1904, and by 1939 the output of geothermal power plants had reached 500 GWh, with major expansion of facilities planned.

  7. Steam turbines for nuclear power plants

    International Nuclear Information System (INIS)

    Kosyak, Yu.F.

    1978-01-01

    Considered are the peculiarities of the design and operation of steam turbines, condensers and supplementary equipment of steam turbines for nuclear power plants; described are the processes of steam flow in humid-steam turbines, calculation and selection principles of main parameters of heat lines. Designs of the turbines installed at the Charkov turbine plant are described in detail as well as of those developed by leading foreign turbobuilding firms

  8. Thermodynamic effects when utilizing waste heat from condensation in cases of a reduced vacuum in steam turbine plants of thermal power stations, to provide heat at low temperatures

    Energy Technology Data Exchange (ETDEWEB)

    Vasiljevic, N.; Savic, B.; Stojakovic, M.

    1986-01-01

    There is an interesting variant of cogeneration in the steam turbine system of a thermal power plant, i.e. the utilisation of the waste heat of condensation with a reduced vacuum without reconstruction of the thermal power plant. The thermodynamic effect in cogeneration was calculated in consideration of the dynamics of heat consumption. This cogeneration process has the advantage of saving primary energy without reconstruction of the thermal power plant.

  9. Water regime of steam power plants

    International Nuclear Information System (INIS)

    Oesz, Janos

    2011-01-01

    The water regime of water-steam thermal power plants (secondary side of pressurized water reactors (PWR); fossil-fired thermal power plants - referred to as steam power plants) has changed in the past 30 years, due to a shift from water chemistry to water regime approach. The article summarizes measures (that have been realised by chemists of NPP Paks) on which the secondary side of NPP Paks has become a high purity water-steam power plant and by which the water chemistry stress corrosion risk of heat transfer tubes in the VVER-440 steam generators was minimized. The measures can also be applied to the water regime of fossil-fired thermal power plants with super- and subcritical steam pressure. Based on the reliability analogue of PWR steam generators, water regime can be defined as the harmony of construction, material(s) and water chemistry, which needs to be provided in not only the steam generators (boiler) but in each heat exchanger of steam power plant: - Construction determines the processes of flow, heat and mass transfer and their local inequalities; - Material(s) determines the minimal rate of general corrosion and the sensitivity for local corrosion damage; - Water chemistry influences the general corrosion of material(s) and the corrosion products transport, as well as the formation of local corrosion environment. (orig.)

  10. Steam generators for nuclear power plants

    International Nuclear Information System (INIS)

    Tillequin, Jean

    1975-01-01

    The role and the general characteristics of steam generators in nuclear power plants are indicated, and particular types are described according to the coolant nature (carbon dioxide, helium, light water, heavy water, sodium) [fr

  11. Soviet steam generator technology: fossil fuel and nuclear power plants

    International Nuclear Information System (INIS)

    Rosengaus, J.

    1987-01-01

    In the Soviet Union, particular operational requirements, coupled with a centralized planning system adopted in the 1920s, have led to a current technology which differs in significant ways from its counterparts elsewhere in the would and particularly in the United States. However, the monograph has a broader value in that it traces the development of steam generators in response to the industrial requirements of a major nation dealing with the global energy situation. Specifically, it shows how Soviet steam generator technology evolved as a result of changing industrial requirements, fuel availability, and national fuel utilization policy. The monograph begins with a brief technical introduction focusing on steam-turbine power plants, and includes a discussion of the Soviet Union's regional power supply (GRES) networks and heat and power plant (TETs) systems. TETs may be described as large central co-generating stations which, in addition to electricity, provide heat in the form of steam and hot water. Plants of this type are a common feature of the USSR today. The adoption of these cogeneration units as a matter of national policy has had a central influence on Soviet steam generator technology which can be traced throughout the monograph. The six chapters contain: a short history of steam generators in the USSR; steam generator design and manufacture in the USSR; boiler and furnace assemblies for fossil fuel-fired power stations; auxiliary components; steam generators in nuclear power plants; and the current status of the Soviet steam generator industry. Chapters have been abstracted separately. A glossary is included containing abbreviations and acronyms of USSR organizations. 26 references

  12. Steam generator replacement at Surry Power Station

    International Nuclear Information System (INIS)

    McKay, H.S.

    1982-01-01

    The purposes of the steam generator repair program at Surry Power Station were to repair the tube degradation caused by corrosion-related phenomena and to restore the integrity of the steam generators to a level equivalent to new equipment. The repair program consisted of (1) replacing the existing lower-shell assemblies with new ones and (2) adding new moisture separation equipment to the upper-shell assemblies. These tasks required that several pieces of reactor coolant piping, feedwater piping, main steam piping, and the steam generator be cut and refurbished for reinstallation after the new lower shell was in place. The safety implications and other potential effects of the repair program both during the repair work and after the unit was returned to power were part of the design basis of the repair program. The repair program has been completed on Unit 2 without any adverse effects on the health and safety of the general public or to the personnel engaged in the repair work. Before the Unit 1 repair program began, a review of work procedures and field changes for the Unit 2 repair was conducted. Several major changes were made to avoid recurrence of problems and to streamline procedures. Steam generator replacements was completed on June 1, 1981, and the unit is presently in the startup phase of the outrage

  13. Integration of torrefaction with steam power plant

    Energy Technology Data Exchange (ETDEWEB)

    Zakri, B.; Saari, J.; Sermyagina, E.; Vakkilainen, E.

    2013-09-01

    Torrefaction is one of the pretreatment technologies to enhance the fuel characteristics of biomass. The efficient and continuous operation of a torrefaction reactor, in the commercial scale, demands a secure biomass supply, in addition to adequate source of heat. Biorefinery plants or biomass-fuelled steam power plants have the potential to integrate with the torrefaction reactor to exchange heat and mass, using available infrastructure and energy sources. The technical feasibility of this integration is examined in this study. A new model for the torrefaction process is introduced and verified by the available experimental data. The torrefaction model is then integrated in different steam power plants to simulate possible mass and energy exchange between the reactor and the plants. The performance of the integrated plant is investigated for different configurations and the results are compared. (orig.)

  14. Steam turbines for nuclear power plants

    International Nuclear Information System (INIS)

    Stastny, M.

    1983-01-01

    A three-cylinder 220 MW saturated steam turbine was developed for WWER reactors by the Skoda concern. Twenty four of these turbines are currently in operation, in production or have been ordered. A 1000 MW four-cylinder turbine is being developed. The disign of the turbines has had to overcome difficulties connected with the unfavourable effects of wet steam at extreme power values. Great attention had to be devoted to the aerodynamics of control valves and to the prevention of flow separation areas. The problem of corrosion-erosion in guide wheels and the high pressure section was resolved by the use of ferritic stainless steels. For the low pressure section it was necessary to separate the moisture and to reheat the steam in the separator-reheater. Difficulties caused by the generation of wet steam in the low pressure section by spontaneous condensation were removed. Also limited was the erosion caused by droplets resulting from the disintegration of water films on the trailing edges. (A.K.)

  15. Combined gas and steam power plant

    Energy Technology Data Exchange (ETDEWEB)

    Morgan, D T; Davis, J P

    1977-06-02

    The invention concerns a combination of internal combustion engine and steam turbine, where not only the heat of the hot exhaust gases of the internal combustion engine, but also the heat in the coolant of the internal combustion engine is used for power generation. The working fluid of the steam turbine is an organic fluid of low boiling point. A mixture of 85 mol% of tri-fluoro ethanol and 15 mol% of water is the most suitable fluid. The combustion engine (a Diesel engine is the most suitable), drives a working machine, e.g. a generator. The hot combustion exhaust gases produce evaporation of the working fluid in an HP evaporator. The superheated steam gives up its energy in the HP turbine stage, flows through the feed preheater of the fluid, and is condensed in the condenser. A pump pumps the fluid via control valve to heat the feed preheater of the fluid, from which it returns to the HP evaporator. At the same time evaporated coolant flows into an LP evaporator in counter-flow to the working fluid, condenses, and is returned to the cooling circuit of the combustion engine. The working fluid in the LP evaporator is heated to its boiling point, gives up its energy in the LP stage of the steam turbine is condensed, pumped to the preheater and returns to the LP evaporator. The two rotors of the turbine stages (HP and LP stages) are mounted on the same shaft, which drives a working machine or a generator.

  16. Cheaper power generation from surplus steam generating capacities

    International Nuclear Information System (INIS)

    Gupta, K.

    1996-01-01

    Prior to independence most industries had their own captive power generation. Steam was generated in own medium/low pressure boilers and passed through extraction condensing turbines for power generation. Extraction steam was used for process. With cheaper power made available in Nehru era by undertaking large hydro power schemes, captive power generation in industries was almost abandoned except in sugar and large paper factories, which were high consumers of steam. (author)

  17. Thermal power blocks with ultra-super-critical steam parameters

    Directory of Open Access Journals (Sweden)

    Aličić Merim M.

    2016-01-01

    Full Text Available New generation of thermal power plants are required to have increased utilization rates, in addition to reduced emissions of pollutants, in order to reach optimal solutions, from both technical and economic point of view. One way to achieve greater utilization efficiency is operation of the plant at super critical (SC or ultra super critical steam parameters (USC. However, achieving high parameters depends on use of new materials, which have better properties at high temperatures and pressures, use of new welding technologies and by solving the problem of corrosion. The paper gives an overview of some of the plants with these parameters.

  18. Cleaning device for steam units in a nuclear power plant

    International Nuclear Information System (INIS)

    Sasamuro, Takemi.

    1978-01-01

    Purpose: To prevent radioactive contamination upon dismantling and inspection of steam units such as a turbine to a building containing such units and the peripheral area. Constitution: A steam generator indirectly heated by steam supplied from steam generating source in a separate system containing no radioactivity is provided to produce cleaning steam. A cleaning steam pipe is connected by way of a stop valve between separation valve of a nuclear power plant steam pipe and a high pressure turbine. Upon cleaning, the separation valve is closed, and steam supplied from the cleaning steam pipe is flown into a condenser. The water thus condensated is returned by way of a feed water heater and a condenser to a water storage tank. (Nakamura, S.)

  19. Generic steam generator life cycle management from a utility perspective

    International Nuclear Information System (INIS)

    Baker, R.L.

    1993-01-01

    Steam generator repairs and replacements, which have occurred over the last 10 years, have lead many utilities to evaluate the economics of continued maintenance on existing steam generators against the economics of steam generator replacement. Such an endeavor requires an assessment of the expected rate and types of degradation. In addition, an identification of possible preventative or remedial measures and their potential effectiveness must be made. To arrive at an assessment of the economic impact of various combinations of potential courses of action many utilities have employed in-house developed or customized commercial programs to convert technical assessments into economic impact evaluations. This paper intends to give the reader an introduction to the technical issues and insight into a method of addressing the economic impact of possible management strategies. 52 refs., 17 figs., 2 tabs

  20. Design of a partial inter-tube lancing system actuated by hydraulic power for type F model steam generator in nuclear power plant

    International Nuclear Information System (INIS)

    Kim, S. T.; Jeong, W. T.

    2008-01-01

    The sludge grown up in steam generators of nuclear power plants shortens the life-cycle of steam generators and reduces the output of power plants. So KHNP(Korea Hydro and Nuclear Power), the only nuclear power utility in Korea, removes it periodically using a steam generator lancing system during the outage of plants for an overhaul. KEPRI(Korea Electric Power Research Institute) has developed lancing systems with high pressured water nozzle for steam generators of nuclear power plants since 2001. In this paper, the design of a partial inter-tube lancing system for model F type steam generators will be described. The system is actuated without a DC motor inner steam generators because the motors in a steam generator make a trouble from high intensity of radioactivity as a break down

  1. Thermodynamic analysis of heat recovery steam generator in combined cycle power plant

    Directory of Open Access Journals (Sweden)

    Ravi Kumar Naradasu

    2007-01-01

    Full Text Available Combined cycle power plants play an important role in the present energy sector. The main challenge in designing a combined cycle power plant is proper utilization of gas turbine exhaust heat in the steam cycle in order to achieve optimum steam turbine output. Most of the combined cycle developers focused on the gas turbine output and neglected the role of the heat recovery steam generator which strongly affects the overall performance of the combined cycle power plant. The present paper is aimed at optimal utilization of the flue gas recovery heat with different heat recovery steam generator configurations of single pressure and dual pressure. The combined cycle efficiency with different heat recovery steam generator configurations have been analyzed parametrically by using first law and second law of thermodynamics. It is observed that in the dual cycle high pressure steam turbine pressure must be high and low pressure steam turbine pressure must be low for better heat recovery from heat recovery steam generator.

  2. Utilization of steam treated agricultural by -product as ruminant feed

    International Nuclear Information System (INIS)

    Naeem, M.; Rajput, N.; Lili, Z.; Su, Z.; Rui, Y.; Tian, W.

    2014-01-01

    Shortage of animal food is a burning issue of the recent time, whereas the agricultural by -products are readily available to be used as ruminants feed. However, the low protein and digestibility are the hindrances in utilization of these low quality crop residues as a feed. In order to utilize rice straw as animal feed this study was conducted to investigate the influence of steam explosion treatment on its composition and in vitro degradability. The samples, I (untreated rice straw), II (rice straw exposed to 15.5 kgf/cm/ sub2/ steam pressure for 90 sec) and III (rice straw exposed to 15.5 kgf/cm/sup 2/steam pressure for 120 sec) were prepared. The results revealed that the crude protein (CP), ether extract (EE) and acid detergent lignin (ADL) contents of rice straw were improved after treatment with steam explosion in time dependent manner (P<0.05). The neutral detergent fiber (NDF), acid detergent fiber (ADF) and organic matter (OM) were higher, while dry matter (DM) and ash contents were lower (P<0.05) in II as compared to group I and III; however, after increasing the time at same pressure these parameters decreased. Furthermore, group III showed higher concentration of propionate, acetate, butyrate, and total VFA (P<0.05). While, group I exhibited higher concentration of iso-butyrate and iso-valerate (P<0.05). The concentration of valeric acid and acetate to propionate ratio were not affected by steam explosion treatment. Moreover, group III showed the higher in vitro DM degradability, OM degradability, DNDF and gas production (P<0.05); while, lower DADF and pH (P<0.05) compared with groups I and II. These findings suggest that the steam explosion treatment at 15.5 kgf/cm/sup 2/ pressure for 120 sec, may be used to enhance the nutritive value and digestibility of rice straw. (author)

  3. HTGR power plant hot reheat steam pressure control system

    International Nuclear Information System (INIS)

    Braytenbah, A.S.; Jaegtnes, K.O.

    1975-01-01

    A control system for a high temperature gas cooled reactor (HTGR) power plant is disclosed wherein such plant includes a plurality of steam generators. Dual turbine-generators are connected to the common steam headers, a high pressure element of each turbine receiving steam from the main steam header, and an intermediate-low pressure element of each turbine receiving steam from the hot reheat header. Associated with each high pressure element is a bypass line connected between the main steam header and a cold reheat header, which is commonly connected to the high pressure element exhausts. A control system governs the flow of steam through the first and second bypass lines to provide for a desired minimum steam flow through the steam generator reheater sections at times when the total steam flow through the turbines is less than such minimum, and to regulate the hot reheat header steam pressure to improve control of the auxiliary steam turbines and thereby improve control of the reactor coolant gas flow, particularly following a turbine trip. (U.S.)

  4. Repowering options for steam power plants

    International Nuclear Information System (INIS)

    Wen, H.; Gopalarathinam, R.

    1992-01-01

    Repowering an existing steam power plant with a gas turbine offers an attractive alternative to a new plant or life extension, especially for unit sizes smaller than 300 MWe. Gas turbine repowering improves thermal efficiency and substantially increases the plant output. Based on recent repowering studies and projects, this paper examines gas turbine repowering options for 100 MWe, 200 MWe and 300 MWe units originally designed for coal firing and currently firing either coal or natural gas. Also discussed is the option for a phased future conversion of the repowered unit to fire coal-derived gas, should there be a fluctuation in the price or availability of natural gas. A modular coal gasification plant designed to shorten the conversion time is presented. Repowering options, performance, costs, and availability impacts are discussed for selected cases

  5. A Steam Utility Network Model for the Evaluation of Heat Integration Retrofits – A Case Study of an Oil Refinery

    Directory of Open Access Journals (Sweden)

    Sofie Marton

    2017-12-01

    Full Text Available This paper presents a real industrial example in which the steam utility network of a refinery is modelled in order to evaluate potential Heat Integration retrofits proposed for the site. A refinery, typically, has flexibility to optimize the operating strategy for the steam system depending on the operation of the main processes. This paper presents a few examples of Heat Integration retrofit measures from a case study of a large oil refinery. In order to evaluate expected changes in fuel and electricity imports to the refinery after implementation of the proposed retrofits, a steam system model has been developed. The steam system model has been tested and validated with steady state data from three different operating scenarios and can be used to evaluate how changes to steam balances at different pressure levels would affect overall steam balances, generation of shaft power in turbines, and the consumption of fuel gas.

  6. LPGC, Levelized Steam Electric Power Generator Cost

    International Nuclear Information System (INIS)

    Coen, J.J.; Delene, J.G.

    1994-01-01

    1 - Description of program or function: LPGC is a set of nine microcomputer programs for estimating power generation costs for large steam-electric power plants. These programs permit rapid evaluation using various sets of economic and technical ground rules. The levelized power generation costs calculated may be used to compare the relative economics of nuclear and coal-fired plants based on life-cycle costs. Cost calculations include capital investment cost, operation and maintenance cost, fuel cycle cost, decommissioning cost, and total levelized power generation cost. These programs can be used for quick analyses of power generation costs using alternative economic parameters, such as interest rate, escalation rate, inflation rate, plant lead times, capacity factor, fuel prices, etc. The two major types of electric generating plants considered are pressurized-water reactor (PWR) and pulverized coal-fired plants. Data are also provided for the Large Scale Prototype Breeder (LSPB) type liquid metal reactor. Costs for plant having either one or two units may be obtained. 2 - Method of solution: LPGC consists of nine individual menu-driven programs controlled by a driver program, MAINPWR. The individual programs are PLANTCAP, for calculating capital investment costs; NUCLOM, for determining operation and maintenance (O and M) costs for nuclear plants; COALOM, for computing O and M costs for coal-fired plants; NFUEL, for calculating levelized fuel costs for nuclear plants; COALCOST, for determining levelized fuel costs for coal-fired plants; FCRATE, for computing the fixed charge rate on the capital investment; LEVEL, for calculating levelized power generation costs; CAPITAL, for determining capitalized cost from overnight cost; and MASSGEN, for generating, deleting, or changing fuel cycle mass balance data for use with NFUEL. LPGC has three modes of operation. In the first, each individual code can be executed independently to determine one aspect of the total

  7. Steam turbine cycle

    International Nuclear Information System (INIS)

    Okuzumi, Naoaki.

    1994-01-01

    In a steam turbine cycle, steams exhausted from the turbine are extracted, and they are connected to a steam sucking pipe of a steam injector, and a discharge pipe of the steam injector is connected to an inlet of a water turbine. High pressure discharge water is obtained from low pressure steams by utilizing a pressurizing performance of the steam injector and the water turbine is rotated by the high pressure water to generate electric power. This recover and reutilize discharged heat of the steam turbine effectively, thereby enabling to improve heat efficiency of the steam turbine cycle. (T.M.)

  8. Shiraz solar power plant operation with steam engine

    International Nuclear Information System (INIS)

    Yaghoubi, M.; Azizian, K.

    2004-01-01

    The present industrial developments and daily growing need of energy, as well as economical and environmental problem caused by fossil fuels consumption, resulted certain constraint for the future demand of energy. During the past two decades great attention has been made to use renewable energy for different sectors. In this regard for the first time in Iran, design and construction of a 250 K W Solar power plant in Shiraz, Iran is being carried out and it will go to operation within next year. The important elements of this power plant is an oil cycle and a steam cycle, and several studies have been done about design and operation of this power plant, both for steady state and transient conditions. For the steam cycle, initially a steam turbine was chosen and due to certain limitation it has been replaced by a steam engine. The steam engine is able to produce electricity with hot or saturated vapor at different pressures and temperatures. In this article, the effects of installing a steam engine and changing its vapor inlet pressure and also the effects of sending hot or saturated vapor to generate electricity are studied. Various cycle performance and daily electricity production are determined. The effects of oil cycle temperature on the collector field efficiency, and daily, monthly and annual amount of electricity production is calculated. Results are compared with the steam cycle output when it contains a steam turbine. It is found that with a steam engine it is possible to produce more annual electricity for certain conditions

  9. Steam Turbine Control Valve Stiction Effect on Power System Stability

    International Nuclear Information System (INIS)

    Halimi, B.

    2010-01-01

    One of the most important problems in power system dynamic stability is low frequency oscillations. This kind of oscillation has significant effects on the stability and security of the power system. In some previous papers, a fact was introduced that a steam pressure continuous fluctuation in turbine steam inlet pipeline may lead to a kind of low frequency oscillation of power systems. Generally, in a power generation plant, steam turbine system composes of some main components, i.e. a boiler or steam generator, stop valves, control valves and turbines that are connected by piping. In the conventional system, the turbine system is composed with a lot of stop and control valves. The steam is provided by a boiler or steam generator. In an abnormal case, the stop valve shuts of the steal flow to the turbine. The steam flow to the turbine is regulated by controlling the control valves. The control valves are provided to regulate the flow of steam to the turbine for starting, increasing or decreasing the power, and also maintaining speed control with the turbine governor system. Unfortunately, the control valve has inherent static friction (stiction) nonlinearity characteristics. Industrial surveys indicated that about 20-30% of all control loops oscillate due to valve problem caused by this nonlinear characteristic. In this paper, steam turbine control valve stiction effect on power system oscillation is presented. To analyze the stiction characteristic effect, firstly a model of control valve and its stiction characteristic are derived by using Newton's laws. A complete tandem steam prime mover, including a speed governing system, a four-stage steam turbine, and a shaft with up to for masses is adopted to analyze the performance of the steam turbine. The governor system consists of some important parts, i.e. a proportional controller, speed relay, control valve with its stiction characteristic, and stem lift position of control valve controller. The steam turbine has

  10. Some aspects affecting fast reactor steam generator integrity considered from a utility viewpoint

    Energy Technology Data Exchange (ETDEWEB)

    Bolt, P R

    1975-07-01

    The important conditions affecting fast reactor steam generator integrity are discussed. In addition to the need for high integrity levels when the steam generator is first delivered to the power station site, the equally important aspect of demonstrating retention of continued high levels of integrity throughout the operating life of the station is described. The functional and related conditions that are believed important to the selection of a design type which can offer adequately high levels of integrity are given. Some of the data needs of a utility concerned with fast reactor S.G.U. design assessment are described, particular emphasis being given to areas believed to have a significant effect on steam generator reliability and integrity. (author)

  11. Steam Turbine Materials for Ultrasupercritical Coal Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Viswanathan, R.; Hawk, J.; Schwant, R.; Saha, D.; Totemeier, T.; Goodstine, S.; McNally, M.; Allen, D. B.; Purgert, Robert

    2009-06-30

    The Ultrasupercritical (USC) Steam Turbine Materials Development Program is sponsored and funded by the U.S. Department of Energy and the Ohio Coal Development Office, through grants to Energy Industries of Ohio (EIO), a non-profit organization contracted to manage and direct the project. The program is co-funded by the General Electric Company, Alstom Power, Siemens Power Generation (formerly Siemens Westinghouse), and the Electric Power Research Institute, each organization having subcontracted with EIO and contributing teams of personnel to perform the requisite research. The program is focused on identifying, evaluating, and qualifying advanced alloys for utilization in coal-fired power plants that need to withstand steam turbine operating conditions up to 760°C (1400°F) and 35 MPa (5000 psi). For these conditions, components exposed to the highest temperatures and stresses will need to be constructed from nickel-based alloys with higher elevated temperature strength than the highchromium ferritic steels currently used in today's high-temperature steam turbines. In addition to the strength requirements, these alloys must also be weldable and resistant to environmental effects such as steam oxidation and solid particle erosion. In the present project, candidate materials with the required creep strength at desired temperatures have been identified. Coatings that can resist oxidation and solid particle erosion have also been identified. The ability to perform dissimilar welds between nickel base alloys and ferritic steels have been demonstrated, and the properties of the welds have been evaluated. Results of this three-year study that was completed in 2009 are described in this final report. Additional work is being planned and will commence in 2009. The specific objectives of the future studies will include conducting more detailed evaluations of the weld-ability, mechanical properties and repair-ability of the selected candidate alloys for rotors

  12. SO2 pollution of heavy oil-fired steam power plants in Iran

    International Nuclear Information System (INIS)

    Nazari, S.; Shahhoseini, O.; Sohrabi-Kashani, A.; Davari, S.; Sahabi, H.; Rezaeian, A.

    2012-01-01

    Steam power plants using heavy oil provided about 17.4%, equivalent to 35.49 TWh, of electricity in Iran in 2007. However, having 1.55–3.5 weight percentage of sulfur, heavy oil produces SO 2 pollutant. Utilization of Flue Gas Desulfurization systems (FGD) in Iran's steam power plants is not common and thereby, this pollutant is dispersed in the atmosphere easily. In 2007, the average emission factor of SO 2 pollutant for steam power plants was 15.27 g/kWh, which means regarding the amount of electricity generated by steam power plants using heavy oil, 541,000 Mg of this pollutant was produced. In this study, mass distribution of SO 2 in terms of Mg/yr is considered and dispersion of this pollutant in each of the 16 steam power plants under study is modeled using Atmospheric Dispersion Modeling System (ADMS). Details of this study are demonstrated using Geographical Information System (GIS) software, ArcGIS. Finally, the average emission factor of SO 2 and the emission of it in Iran's steam power plants as well as SO 2 emission reduction programs of this country are compared with their alternatives in Turkey and China.

  13. A condenser for very high power steam turbines

    International Nuclear Information System (INIS)

    Gardey, Robert.

    1973-01-01

    The invention relates to a condenser for very high power steam turbines under the masonry-block supporting the low-pressure stages of the turbine, that condenser comprises two horizontal aligned water-tube bundles passing through the steam-exhaust sleeves of the low-pressure stages, on both sides of a common inlet water box. The invention can be applied in particular to the 1000-2000 MW turbines of light water nuclear power stations [fr

  14. Hydrogen-based power generation from bioethanol steam reforming

    Energy Technology Data Exchange (ETDEWEB)

    Tasnadi-Asztalos, Zs., E-mail: tazsolt@chem.ubbcluj.ro; Cormos, C. C., E-mail: cormos@chem.ubbcluj.ro; Agachi, P. S. [Babes-Bolyai University, Faculty of Chemistry and Chemical Engineering, 11 Arany Janos, Postal code: 400028, Cluj-Napoca (Romania)

    2015-12-23

    This paper is evaluating two power generation concepts based on hydrogen produced from bioethanol steam reforming at industrial scale without and with carbon capture. The power generation from bioethanol conversion is based on two important steps: hydrogen production from bioethanol catalytic steam reforming and electricity generation using a hydrogen-fuelled gas turbine. As carbon capture method to be assessed in hydrogen-based power generation from bioethanol steam reforming, the gas-liquid absorption using methyl-di-ethanol-amine (MDEA) was used. Bioethanol is a renewable energy carrier mainly produced from biomass fermentation. Steam reforming of bioethanol (SRE) provides a promising method for hydrogen and power production from renewable resources. SRE is performed at high temperatures (e.g. 800-900°C) to reduce the reforming by-products (e.g. ethane, ethene). The power generation from hydrogen was done with M701G2 gas turbine (334 MW net power output). Hydrogen was obtained through catalytic steam reforming of bioethanol without and with carbon capture. For the evaluated plant concepts the following key performance indicators were assessed: fuel consumption, gross and net power outputs, net electrical efficiency, ancillary consumptions, carbon capture rate, specific CO{sub 2} emission etc. As the results show, the power generation based on bioethanol conversion has high energy efficiency and low carbon footprint.

  15. Hydrogen-based power generation from bioethanol steam reforming

    International Nuclear Information System (INIS)

    Tasnadi-Asztalos, Zs.; Cormos, C. C.; Agachi, P. S.

    2015-01-01

    This paper is evaluating two power generation concepts based on hydrogen produced from bioethanol steam reforming at industrial scale without and with carbon capture. The power generation from bioethanol conversion is based on two important steps: hydrogen production from bioethanol catalytic steam reforming and electricity generation using a hydrogen-fuelled gas turbine. As carbon capture method to be assessed in hydrogen-based power generation from bioethanol steam reforming, the gas-liquid absorption using methyl-di-ethanol-amine (MDEA) was used. Bioethanol is a renewable energy carrier mainly produced from biomass fermentation. Steam reforming of bioethanol (SRE) provides a promising method for hydrogen and power production from renewable resources. SRE is performed at high temperatures (e.g. 800-900°C) to reduce the reforming by-products (e.g. ethane, ethene). The power generation from hydrogen was done with M701G2 gas turbine (334 MW net power output). Hydrogen was obtained through catalytic steam reforming of bioethanol without and with carbon capture. For the evaluated plant concepts the following key performance indicators were assessed: fuel consumption, gross and net power outputs, net electrical efficiency, ancillary consumptions, carbon capture rate, specific CO 2 emission etc. As the results show, the power generation based on bioethanol conversion has high energy efficiency and low carbon footprint

  16. Hydrogen-based power generation from bioethanol steam reforming

    Science.gov (United States)

    Tasnadi-Asztalos, Zs.; Cormos, C. C.; Agachi, P. S.

    2015-12-01

    This paper is evaluating two power generation concepts based on hydrogen produced from bioethanol steam reforming at industrial scale without and with carbon capture. The power generation from bioethanol conversion is based on two important steps: hydrogen production from bioethanol catalytic steam reforming and electricity generation using a hydrogen-fuelled gas turbine. As carbon capture method to be assessed in hydrogen-based power generation from bioethanol steam reforming, the gas-liquid absorption using methyl-di-ethanol-amine (MDEA) was used. Bioethanol is a renewable energy carrier mainly produced from biomass fermentation. Steam reforming of bioethanol (SRE) provides a promising method for hydrogen and power production from renewable resources. SRE is performed at high temperatures (e.g. 800-900°C) to reduce the reforming by-products (e.g. ethane, ethene). The power generation from hydrogen was done with M701G2 gas turbine (334 MW net power output). Hydrogen was obtained through catalytic steam reforming of bioethanol without and with carbon capture. For the evaluated plant concepts the following key performance indicators were assessed: fuel consumption, gross and net power outputs, net electrical efficiency, ancillary consumptions, carbon capture rate, specific CO2 emission etc. As the results show, the power generation based on bioethanol conversion has high energy efficiency and low carbon footprint.

  17. Fluid distribution network and steam generators and method for nuclear power plant training simulator

    International Nuclear Information System (INIS)

    Alliston, W.H.; Johnson, S.J.; Mutafelija, B.A.

    1975-01-01

    A description is given of a training simulator for the real-time dynamic operation of a nuclear power plant which utilizes apparatus that includes control consoles having manual and automatic devices corresponding to simulated plant components and indicating devices for monitoring physical values in the simulated plant. A digital computer configuration is connected to the control consoles to calculate the dynamic real-time simulated operation of the plant in accordance with the simulated plant components to provide output data including data for operating the control console indicating devices. In the method and system for simulating a fluid distribution network of the power plant, such as that which includes, for example, a main steam system which distributes steam from steam generators to high pressure turbine steam reheaters, steam dump valves, and feedwater heaters, the simultaneous solution of linearized non-linear algebraic equations is used to calculate all the flows throughout the simulated system. A plurality of parallel connected steam generators that supply steam to the system are simulated individually, and include the simulation of shrink-swell characteristics

  18. Thermal performance test for steam turbine of nuclear power plants

    International Nuclear Information System (INIS)

    Bu Yubing; Xu Zongfu; Wang Shiyong

    2014-01-01

    Through study of steam turbine thermal performance test of CPR1000 nuclear power plant, we solve the enthalpy calculation problems of the steam turbine in wet steam zone using heat balance method which can help to figure out the real overall heat balance diagram for the first time, and we develop a useful software for thermal heat balance calculation. Ling'ao phase II as an example, this paper includes test instrument layout, system isolation, risk control, data acquisition, wetness measurement, heat balance calculation, etc. (authors)

  19. Steam table routines for the simulation of nuclear power plants

    International Nuclear Information System (INIS)

    Hall, C.A.; Mutafelija, B.A.; Rapp, J.P.

    1976-01-01

    The dynamic simulation of nuclear power generating stations requires evaluation of a large number of steam and water properties at every integration time step. Some of the interpolation/approximation methods presently used are described with particular emphasis on the use of the bilinear transfinite interpolation method. The fundamental requirements for the steam table routines are outlined and different approaches are compared. The superiority of the bilinear transfinite interpolation method is discussed. The use of the steam table functions in real-time simulation is of particular interest

  20. Thermo hydrodynamical analyses of steam generator of nuclear power plant

    International Nuclear Information System (INIS)

    Petelin, S.; Gregoric, M.

    1984-01-01

    SMUP computer code for stationary model of a U-tube steam generator of a PWR nuclear power plant was developed. feed water flow can enter through main and auxiliary path. The computer code is based on the one dimensional mathematical model. Among the results that give an insight into physical processes along the tubes of steam generator are distribution of temperatures, water qualities, heat transfer rates. Parametric analysis permits conclusion on advantage of each design solution regarding heat transfer effects and safety of steam generator. (author)

  1. Improvements in steam cycle electric power generating plants

    International Nuclear Information System (INIS)

    Bienvenu, Claude.

    1973-01-01

    The invention relates to a steam cycle electric energy generating plants of the type comprising a fossil or nuclear fuel boiler for generating steam and a turbo alternator group, the turbine of which is fed by the boiler steam. The improvement is characterized in that use is made of a second energy generating group in which a fluid (e.g. ammoniac) undergoes a condensation cycle the heat source of said cycle being obtained through a direct or indirect heat exchange with a portion of the boiler generated steam whereby it is possible without overloading the turbo-alternator group, to accomodate any increase of the boiler power resulting from the use of another fuel while maintaining a maximum energy output. This can be applied to electric power stations [fr

  2. Comparison of Steam Oxidation of 18%Cr Steels from Various Power Plants

    DEFF Research Database (Denmark)

    Montgomery, Melanie; Hald, John

    2015-01-01

    Lean austenitic steels such as the 18%Cr TP347H have been utilized in many power plants in Denmark. Steam oxidation has been investigated for both coarse-grained and fine-grained versions of TP347H. Oxidation for coarsegrained steels follows a parabolic rate however this is not always the case fo...

  3. Linear Dynamics Model for Steam Cooled Fast Power Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, H

    1968-04-15

    A linear analytical dynamic model is developed for steam cooled fast power reactors. All main components of such a plant are investigated on a general though relatively simple basis. The model is distributed in those parts concerning the core but lumped as to the external plant components. Coolant is considered as compressible and treated by the actual steam law. Combined use of analogue and digital computer seems most attractive.

  4. Selling steam

    International Nuclear Information System (INIS)

    Zimmer, M.J.; Goodwin, L.M.

    1991-01-01

    This article addresses the importance of steam sales contract is in financing cogeneration facilities. The topics of the article include the Public Utility Regulatory Policies Act provisions and how they affect the marketing of steam from qualifying facilities, the independent power producers market shift, and qualifying facility's benefits

  5. Gas--steam turbine combined cycle power plants

    Energy Technology Data Exchange (ETDEWEB)

    Christian, J.E.

    1978-10-01

    The purpose of this technology evaluation is to provide performance and cost characteristics of the combined gas and steam turbine, cycle system applied to an Integrated Community Energy System (ICES). To date, most of the applications of combined cycles have been for electric power generation only. The basic gas--steam turbine combined cycle consists of: (1) a gas turbine-generator set, (2) a waste-heat recovery boiler in the gas turbine exhaust stream designed to produce steam, and (3) a steam turbine acting as a bottoming cycle. Because modification of the standard steam portion of the combined cycle would be necessary to recover waste heat at a useful temperature (> 212/sup 0/F), some sacrifice in the potential conversion efficiency is necessary at this temperature. The total energy efficiency ((electric power + recovered waste heat) divided by input fuel energy) varies from about 65 to 73% at full load to 34 to 49% at 20% rated electric power output. Two major factors that must be considered when installing a gas--steam turbine combines cycle are: the realiability of the gas turbine portion of the cycle, and the availability of liquid and gas fuels or the feasibility of hooking up with a coal gasification/liquefaction process.

  6. 1000 MW steam turbine for Temelin nuclear power station

    International Nuclear Information System (INIS)

    Drahy, J.

    1992-01-01

    Before the end 1991 the delivery was completed of the main parts (3 low-pressure sections and 1 high-pressure section, all of double-flow design) of the first full-speed (3000 r.p.m.) 1000 MW steam turbine for saturated admission steam for the Temelin nuclear power plant. Description of the turbine design and of new technologies and tools used in the manufacture are given. Basic technical parameters of the steam turbine are as follows: maximum output of steam generators 6060 th -1 ; maximum steam flow into turbine 5494.7 th -1 ; output of turbo-set 1024 MW; steam conditions before the turbine inlet: pressure 5.8 MPa, temperature 273.3 degC, steam wetness 0.5%; nominal temperature of cooling water 21 degC; temperature of feed water 220.8 degC; maximum consumption of heat from turbine for heating at 3-stage heating of heating water 60/150 degC. (Z.S.) 7 figs., 2 refs

  7. Modeling and optimization of a utility system containing multiple extractions steam turbines

    International Nuclear Information System (INIS)

    Luo, Xianglong; Zhang, Bingjian; Chen, Ying; Mo, Songping

    2011-01-01

    Complex turbines with multiple controlled and/or uncontrolled extractions are popularly used in the processing industry and cogeneration plants to provide steam of different levels, electric power, and driving power. To characterize thermodynamic behavior under varying conditions, nonlinear mathematical models are developed based on energy balance, thermodynamic principles, and semi-empirical equations. First, the complex turbine is decomposed into several simple turbines from the controlled extraction stages and modeled in series. THM (The turbine hardware model) developing concept is applied to predict the isentropic efficiency of the decomposed simple turbines. Stodola's formulation is also used to simulate the uncontrolled extraction steam parameters. The thermodynamic properties of steam and water are regressed through linearization or piece-wise linearization. Second, comparison between the simulated results using the proposed model and the data in the working condition diagram provided by the manufacturer is conducted over a wide range of operations. The simulation results yield small deviation from the data in the working condition diagram where the maximum modeling error is 0.87% among the compared seven operation conditions. Last, the optimization model of a utility system containing multiple extraction turbines is established and a detailed case is analyzed. Compared with the conventional operation strategy, a maximum of 5.47% of the total operation cost is saved using the proposed optimization model. -- Highlights: → We develop a complete simulation model for steam turbine with multiple extractions. → We test the simulation model using the performance data of commercial turbines. → The simulation error of electric power generation is no more than 0.87%. → We establish a utility system operational optimization model. → The optimal industrial operation scheme featured with 5.47% of cost saving.

  8. Steam generator replacement at the Obrigheim nuclear power station

    International Nuclear Information System (INIS)

    Pickel, E.; Schenk, H.; Huemmler, A.

    1984-01-01

    The Obrigheim Nuclear Power Station (KWO) is equipped with a dual-loop pressurized water reactor of 345 MW electric power; it was built by Siemens in the period 1965 to 1968. By the end of 1983, KWO had produced some 35 billion kWh in 109,000 hours of operation. Repeated leaks in the heater tubes of the two steam generators had occurred since 1971. Both steam generators were replaced in the course of the 1983 annual revision. Kraftwerk Union AG (KWU) was commissioned to plant and carry out the replacement work. Despite the leakages the steam generators had been run safely and reliably over a period of 14 years until their replacement. Replacing the steam generators was completed within twelve weeks. In addition to the KWO staff and the supervising crew of KWU, some 400 external fitters were employed on the job at peak work-load periods. For the revision of the whole plant, work on the emergency systems and replacement of the steam generators a maximum number of approx. 900 external fitters were employed in the plant in addition to some 250 members of the plant crew. The exposure dose of the personnel sustained in the course of the steam generator replacement was 690 man-rem, which was clearly below previous estimates. (orig.) [de

  9. Integration of the steam cycle and CO2 capture process in a decarbonization power plant

    International Nuclear Information System (INIS)

    Xu, Gang; Hu, Yue; Tang, Baoqiang; Yang, Yongping; Zhang, Kai; Liu, Wenyi

    2014-01-01

    A new integrated system with power generation and CO 2 capture to achieve higher techno-economic performance is proposed in this study. In the new system, three measures are adopted to recover the surplus energy from the CO 2 capture process. The three measures are as follows: (1) using a portion of low-pressure steam instead of high-pressure extracted steam by installing the steam ejector, (2) mixing a portion of flash-off water with the extracted steam to utilize the superheat degree of the extracted steam, and (3) recycling the low-temperature waste heat from the CO 2 capture process to heat the condensed water. As a result, the power output of the new integrated system is 107.61 MW higher than that of a decarbonization power plant without integration. The efficiency penalty of CO 2 capture is expected to decrease by 4.91%-points. The increase in investment produced by the new system is 3.25 M$, which is only 0.88% more than the total investment of a decarbonization power plant without integration. Lastly, the cost of electricity and CO 2 avoided is 15.14% and 33.1% lower than that of a decarbonization power generation without integration, respectively. The promising results obtained in this study provide a new approach for large-scale CO 2 removal with low energy penalty and economic cost. - Highlights: • Energy equilibrium in CO 2 capture process is deeply analyzed in this paper. • System integration is conducted in a coal-fired power plant with CO 2 capture. • The steam ejector is introduced to utilize the waste energy from CO 2 capture process. • Thermodynamic, exergy and techno-economic analyses are quantitatively conducted. • Energy-saving effects are found in the new system with minimal investment

  10. Strain measurements of nuclear power plant steam generator antiseismic supports

    International Nuclear Information System (INIS)

    Kulichevsky, R.

    1997-01-01

    The nuclear power plants steam generators have different types of structural supports. One of these types are the antiseismic supports, which are intended to be under stress only if a seismic event takes place. Nevertheless, the antiseismic supports lugs, that are welded to the steam generator vessel, are subjected to thermal fatigue because of the temperature cycles related with the shut down and start up operations performed during the life of the nuclear power plant. In order to evaluate the stresses that the lugs are subjected to, several strain gages were welded on two supports lugs, positioned at two heights of one of the Embalse nuclear power plant steam generators. In this paper, the instrumentation used and the strain measurements obtained during two start up operations are presented. The influence of the plant start up operation parameters on the lugs strain evolution is also analyzed. (author) [es

  11. Steam generator and condenser design of WWER-1000 type of nuclear power plant

    International Nuclear Information System (INIS)

    Zare Shahneh, Abolghasem.

    1995-03-01

    Design process of steam generator and condenser at Russian nuclear power plant type WWER-1000 is identified. The four chapter of the books are organized as nuclear power plant, types of steam generators specially horizontal steam generator, process of steam generator design and the description of condenser and its process design

  12. How to compute the power of a steam turbine with condensation, knowing the steam quality of saturated steam in the turbine discharge

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez Albarran, Manuel Jaime; Krever, Marcos Paulo Souza [Braskem, Sao Paulo, SP (Brazil)

    2009-07-01

    To compute the power and the thermodynamic performance in a steam turbine with condensation, it is necessary to know the quality of the steam in the turbine discharge and, information of process variables that permit to identifying with high precision the enthalpy of saturated steam. This paper proposes to install an operational device that will expand the steam from high pressure point on the shell turbine to atmosphere, both points with measures of pressure and temperature. Arranging these values on the Mollier chart, it can be know the steam quality value and with this data one can compute the enthalpy value of saturated steam. With the support of this small instrument and using the ASME correlations to determine the equilibrium temperature and knowing the discharge pressure in the inlet of surface condenser, the absolute enthalpy of the steam discharge can be computed with high precision and used to determine the power and thermodynamic efficiency of the turbine. (author)

  13. Steam generator replacement at Kansai Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Kimura, S.; Dodo, Takashi; Negishi, Kazuo

    1995-01-01

    Eleven nuclear units are in operation at the Kansai Electric Power Co., Inc.. In seven of them, Mihama-1·2·3, Takahama-1·2, and Ohi-1·2, comparatively long duration for tube inspection and repair have been required during late annual outages. KEPCO decided to replace all steam generators in these 7 units with the latest model which was improved upon the past degradation experiences, as a result of comprehensive considerations including public confidence in nuclear power generation, maintenability, and economic efficiency. This report presents the design improvements in new steam generators, replacement techniques, and so on. (author)

  14. Steam generator life cycle management: Ontario Power Generation (OPG) experience

    International Nuclear Information System (INIS)

    Maruska, C.C.

    2002-01-01

    A systematic managed process for steam generators has been implemented at Ontario Power Generation (OPG) nuclear stations for the past several years. One of the key requirements of this managed process is to have in place long range Steam Generator Life Cycle Management (SG LCM) plans for each unit. The primary goal of these plans is to maximize the value of the nuclear facility through safe and reliable steam generator operation over the expected life of the units. The SG LCM plans integrate and schedule all steam generator actions such as inspection, operation, maintenance, modifications, repairs, assessments, R and D, performance monitoring and feedback. This paper discusses OPG steam generator life cycle management experience to date, including successes, failures and how lessons learned have been re-applied. The discussion includes relevant examples from each of the operating stations: Pickering B and Darlington. It also includes some of the experience and lessons learned from the activities carried out to refurbish the steam generators at Pickering A after several years in long term lay-up. The paper is structured along the various degradation modes that have been observed to date at these sites, including monitoring and mitigating actions taken and future plans. (author)

  15. Simulation of steam-water and binary geothermal power plants

    International Nuclear Information System (INIS)

    Popel', O.S.; Frid, S.E.; Shpil'rajn, Eh.Eh.

    2004-01-01

    The generalized scheme of the geothermal power plant (GeoPP), assuming the possibility of the electric power production in the steam-water turbine or in the turbine on the low-boiling working body, is considered. The GeoPP mathematical model, making it possible to carry out the comparison of the power indices of various GeoPP schemes and analysis of the calculational indices sensitivity of these schemes to the mode parameters change, is presented [ru

  16. Environmental codes of practice for steam electric power generation

    International Nuclear Information System (INIS)

    1985-03-01

    The Design Phase Code is one of a series of documents being developed for the steam electric power generation industry. This industry includes fossil-fuelled stations (gas, oil and coal-fired boilers), and nuclear-powered stations (CANDU heavy water reactors). In this document, environmental concerns associated with water-related and solid waste activities of steam electric plants are discussed. Design recommendations are presented that will minimize the detrimental environmental effects of once-through cooling water systems, of wastewaters discharged to surface waters and groundwaters, and of solid waste disposal sites. Recommendations are also presented for the design of water-related monitoring systems and programs. Cost estimates associated with the implementation of these recommendations are included. These technical guides for new or modified steam electric stations are the result to consultation with a federal-provincial-industry task force

  17. Modular steam generator for use in nuclear power plants

    International Nuclear Information System (INIS)

    Cella, A.

    1979-01-01

    An improved steam generator for a PWR is described. A turbine generator is driven by the steam output of the steam generator to provide electrical power. The improvement provides vertically assemblable modules which are removably mounted together in sealing relationship. The modules comprising a base module, a tube bundle module removably mountable on the base module in sealing relationship, and an uppermost dryer module removably mountable on the tube bundle module in sealing relationship. Ready access to and removal of the tube bundle module in situ from the nuclear power plant steam generator is facilitated. The dryer module contains moisture separator for drying the generated steam. The base module, upon which the associated weight of the vertically assembled dryer module and tube bundle module are supported, contains the inlet and outlet for the heat exchange fluid. The tube bundle module contains the tube bundle through which the heat exchange fluid flows as well as an inlet for feedwater. The tube sheet serves as a closure flange for the tube bundle module, with the associated weight of the vertically assembled dryer module and tube bundle module on the tube sheet closure flange effectuating the sealing relationship between the base module and the tube bundle module for facilitating closure

  18. Wind Power Utilization Guide.

    Science.gov (United States)

    1981-09-01

    The expres- sions for the rotor torque for a Darrieus machine can be found in Reference 4.16. The Darrieus wind turbine offers the following... turbine generators, wind -driven turbines , power conditioning, wind power, energy conservation, windmills, economic ana \\sis. 20 ABS 1"ACT (Conti,on... turbines , power conditioning requirements, siting requirements, and the economics of wind power under different conditions. Three examples are given to

  19. Power Plants, Steam and Gas Turbines WebQuest

    Science.gov (United States)

    Ulloa, Carlos; Rey, Guillermo D.; Sánchez, Ángel; Cancela, Ángeles

    2012-01-01

    A WebQuest is an Internet-based and inquiry-oriented learning activity. The aim of this work is to outline the creation of a WebQuest entitled "Power Generation Plants: Steam and Gas Turbines." This is one of the topics covered in the course "Thermodynamics and Heat Transfer," which is offered in the second year of Mechanical…

  20. Steam generator for use in nuclear power plants

    International Nuclear Information System (INIS)

    Cella, A.

    1980-01-01

    An improved steam generator is described for use in a nuclear power plant of the pressurized water type in which a turbine generator is driven by the steam output of the steam generator to provide electrical power therefrom. The improvement comprises providing a vertically movable grid structure vertically extending within the interior of the lower housing portion of the steam generator through which individual tubes comprising a vertically extending tube bundle extend. The tube bundle has a tube sheet at one end thereof supporting the tube bundle for the tubes extending through the tube sheet in flow through communication with a heat exchange fluid inlet. The grid structure defines grid apertures therein through which the individual tubes extend with each of the grid apertures being in surrounding relationship with a portion of an associated one of the tubes. The grid structure is movable for a predetermined vertical extent, such as by hydraulic means, such as a piston, along the tubes for vertically displacing the means defining the grid apertures by a sufficient amount for removing the previously surrounded portion of each of the tubes from the associated grid apertures whereby an enhanced reading of the condition of the tubes at the previously surrounded portion is enabled. The steam generator may comprise vertically assemblable modules which are removably mounted together in sealing relationship, with the modules comprising a base module, a tube bundle module removably mountable on the base module in sealing relationship therewith and an uppermost drier module removably mountable on the tube bundle module in sealing relationship therewith whereby ready access to removal of the tube bundle module in situ from the nuclear power plant steam generator is facilitated

  1. Kawasaki steam power plant of Tokyo Electric Power Co. and an example of geothermal power generation

    Energy Technology Data Exchange (ETDEWEB)

    1961-01-01

    The first part of this discussion is devoted to a description of the Kawasaki steam power plant, installed by Tokyo Electric Co. to supply electricity to the Keihin industrial area. The output is 700 MW and it possesses a thermal efficiency of 36.9%. The plant is operated automatically by remote control. The latter section describes the status of a geothermal power station in Hakone. It outlines the steam distribution piping, the steam itself, the turbine and vapor/water separation equipment. With regard to technical problems, it is suggested that old wells having weak pressure can be restored by self-cleaning and that further improvement can be brought about by dynamiting the base of the borehole.

  2. 1000 MW steam turbine for nuclear power station

    International Nuclear Information System (INIS)

    Drahy, J.

    1987-01-01

    Skoda Works started the manufacture of the 1000 MW steam turbine for the Temelin nuclear power plant. The turbine will use saturated steam at 3,000 r.p.m. It will allow steam supply to heat water for district heating, this of an output of 893 MW for a three-stage water heating at a temperature of 150/60 degC or of 570 MW for a two-stage heating at a temperature of 120/60 degC. The turbine features one high-pressure and three identical low-pressure stages. The pressure gradient between the high-pressure and the low-pressure parts was optimized as concerns the thermal efficiency of the cycle and the thermodynamic efficiency of the low-pressure part. A value of 0.79 MPa was selected corresponding to the maximum flow rate of the steam entering the turbine. This is 5,495 t/h, the admission steam parameters are 273.3 degC and 5.8 MPa. The feed water temperature is 220.9 degC. It is expected that throughout the life of the turbine, there will be 300 cold starts, 1,000 starts following shutdown for 55 to 88 hours, and 600 starts following shutdown for 8 hours. (Z.M.). 8 figs., 1 ref

  3. Design features of Advanced Power Reactor (APR) 1400 steam generator

    International Nuclear Information System (INIS)

    Park, Tae-Jung; Park, Jun-Soo; Kim, Moo-Yong

    2004-01-01

    Advanced Power Reactor 1400 (APR 1400) which is to achieve the improvement of the safety and economical efficiency has been developed by Korea Hydro and Nuclear Power Co., Ltd. (KHNP) with the support from industries and research institutes. The steam generator for APR 1400 is an evolutionary type from System 80 + , which is the recirculating U-tube heat exchanger with integral economizer. Compared to the System 80 + steam generator, it is focused on the improved design features, operating and design conditions of APR 1400 steam generator. Especially, from the operation experience of Korean Standard Nuclear Power Plant (KSNP) steam generator, the lessons-learned measures are incorporated to prevent the tube wear caused by flow-induced vibration (FIV). The concepts for the preventive design features against FIV are categorized to two fields; flow distribution and dynamic response characteristics. From the standpoint of flow distribution characteristics, the egg-crate flow distribution plate (EFDP) is installed to prevent the local excessive flow loaded on the most susceptible tube to wear. The parametric study is performed to select the optimum design with the efficient mitigation of local excessive flow. ATHOS3 Mod-01 is used and partly modified to analyze the flow field of the APR 1400 steam generator. In addition, the upper tube bundle support is designed to eliminate the presence of tube with a low natural frequency. Based on the improved upper tube bundle support, the modal analysis is performed and compared with that of System 80 + . Using the results of flow distribution and modal analysis, the two mechanisms of flow-induced vibration are investigated; fluid-elastic instability (FEI) and random turbulence excitation (RTE). (authors)

  4. Station power supply by residual steam of Fugen

    Energy Technology Data Exchange (ETDEWEB)

    Kamiya, Y.; Kato, H.; Hattori, S. (Power Reactor and Nuclear Fuel Development Corp., Tokyo (Japan))

    1981-09-01

    In the advanced thermal reactor ''Fugen'', when the sudden decrease of load more than 40% occurs due to the failure of power system, the turbine regulating valve is rapidly shut, and the reactor is brought to scrum. However, the operation of turbo-generators is continued with the residual steam in the reactor, and the power for inside the station is supplied for 30 sec by the limiting timer, then the power-generating plant is automatically stopped. The reasons why such design was adopted are to reduce manual operation at the time of emergency, to continue water supply for cooling the reactor and to maintain the water level in the steam drum, and to reduce steam release from the safety valve and the turbine bypass valve. The output-load unbalance relay prevents the everspeed of the turbo-generator when load decreased suddenly, but when the failure of power system is such that recovers automatically in course of time, it does not work. The calculation for estimating the dynamic characteristics at the time of the sole operation within the station is carried out by the analysis code FATRAC. The input conditions for the calculation and the results are reported. Also the dynamic characteristics were actually tested to confirm the set value of the limiting timer and the safe working of turbine and generator trips. The estimated and tested results were almost in agreement.

  5. Plant for the delivery of long-distance steam combined with a nuclear power plant

    International Nuclear Information System (INIS)

    Schueller, K.H.

    1976-01-01

    It is proposed that long-distance steam should not be directly discharged in order to avoid each posibility of spreading radioactively contaminated steam. As a heat transmitter, a surface heat exchanger should be chosen, the heating steam of the nuclear power station heating pressurized water whose pressure is higher then that of the heating steam. Long-distance steam generation then results from expanding the pressurized water. The plant is described in detail. (UWI) [de

  6. Saturated steam turbines for power reactors of WWER-type

    International Nuclear Information System (INIS)

    Czwiertnia, K.

    1978-01-01

    The publication deals with design problems of large turbines for saturated steam and with problem of output limitations of single shaft normal speed units. The possibility of unification of conventional and nuclear turbines, which creates the economic basis for production of both types of turbines by one manufacturer based on standarized elements and assemblies is underlined. As separate problems the distribution of nuclear district heating power systems are considered. The choice of heat diagram for district heating saturated steam turbines, the advantages of different diagrams and evaluaton for further development are presented. On this basis a program of unified turbines both condensing and district heating type suitable for Soviet reactors of WWER-440 and WWER-1000 type for planned development of nuclear power in Poland is proposed. (author)

  7. Turbine steam path replacement at the Grafenrheinfeld Nuclear Power Station

    International Nuclear Information System (INIS)

    Weschenfelder, K.D.; Oeynhausen, H.; Bergmann, D.; Hosbein, P.; Termuehlen, H.

    1994-01-01

    In the last few years, replacement of old vintage steam turbine flow path components has been well established as a valid approach to improve thermal performance of aged turbines. In nuclear power plants, performance improvement is generally achieved only by design improvements since performance deterioration of old units is minor or nonexistent. With fossil units operating over decades loss in performance is an additional factor which can be taken into account. Such loss of performance can be caused by deposits, solid particle erosion, loss of shaft and inter-stage seal strips, etc. Improvement of performance is typically guaranteed as output increases for operation at full load. This value can be evaluated as a direct gain in unit capacity without fuel or steam supply increase. Since fuel intake does not change, the relative improvement of the net plant heat rate or efficiency is equal to the relative increase in output. The heat rate improvement is achieved not only at full load but for the entire load range. Such heat rate improvement not only moves a plant up on the load dispatch list increasing its capacity factor, but also extensive fuel savings can pay off for the investment cost of new steam path components. Another important factor is that quite often older turbine designs show a deterioration of their reliability and need costly repairs. With new flow path components an aged steam turbine starts a new useful life

  8. Mechanical problems in turbomachines, steam and gas turbines. Large steam turbine manufacturing requirements to fulfill customer needs for electric power

    International Nuclear Information System (INIS)

    Brazzini, R.

    1975-01-01

    The needs of the customers in large steam turbines for electric power are examined. The choices and decisions made by the utility about the equipments are dealt with after considering the evolution of power demand on the French network. These decisions and choices mainly result from a technical and economic optimization of production equipments: choice of field-proven solutions, trend to lower steam characteristics, trend to higher output of the units (i.e. size effect), spreading out standardization of machines and components (policy of technical as well as technological levels, i.e. mass production effect). Standardization of external characteristics of units of same level of output and even standardization of some main components. The requirements turbine manufacturers have to meet may fall in two categories: on one side: gaining experience and know-how, capability of making high quality experiments, out put capacity, will to hold a high efficiency level; on the other side: meeting the technical requirements related to the contracts. Among these requirements, one can differentiate those dealing with the service expected from the turbine and that resulting in the responsibility limits of the manufacturer and those tending to gain interchangeability, to improve availability of the equipment, to increase safety, and to make operation and maintenance easier [fr

  9. Hydrogen generation utilizing integrated CO2 removal with steam reforming

    Science.gov (United States)

    Duraiswamy, Kandaswamy; Chellappa, Anand S

    2013-07-23

    A steam reformer may comprise fluid inlet and outlet connections and have a substantially cylindrical geometry divided into reforming segments and reforming compartments extending longitudinally within the reformer, each being in fluid communication. With the fluid inlets and outlets. Further, methods for generating hydrogen may comprise steam reformation and material adsorption in one operation followed by regeneration of adsorbers in another operation. Cathode off-gas from a fuel cell may be used to regenerate and sweep the adsorbers, and the operations may cycle among a plurality of adsorption enhanced reformers to provide a continuous flow of hydrogen.

  10. ASTRID power conversion system: Assessment on steam and gas options

    International Nuclear Information System (INIS)

    Laffont, Guy; Cachon, Lionel; Jourdain, Vincent; Fauque, Jean Marie

    2013-01-01

    Conclusion: ◆ Two power conversion systems have been investigated for the ASTRID prototype. ◆ Steam PCS: • Most mature system based on a well-developed turbomachinery technology. • High plant efficiency. • Studies on steam generators designs and leak detection systems in progress with the aim of reducing the risk of large SWRs and of limiting its consequences. • Design and licensing safety assessment of a SFR must deal with the Sodium Water Air reaction (SWAR). ◆ Gas PCS: • Strong advantage as it inherently eliminates the SWR and SWAR risks. • Very innovative option: major breakthroughs but feasibility and viability not yet demonstrated. • Remaining technological challenges but no showstopper indentified. • General architecture: investigations in progress to improve performances, operability and maintainability

  11. Steam generator materials and secondary side water chemistry in nuclear power stations

    International Nuclear Information System (INIS)

    Rudelli, M.D.

    1979-04-01

    The main purpose of this work is to summarize the European and North American experiences regarding the materials used for the construction of the steam generators and their relative corrosion resistance considering the water chemestry control method. Reasons underlying decision for the adoption of Incoloy 800 as the material for the secondary steam generator system for Atucha I Nuclear Power Plant (Atucha Reactor) and Embalse de Rio III Nuclear Power Plant (Cordoba Reactor) are pointed out. Backup information taken into consideration for the decision of utilizing the All Volatil Treatment for the water chemistry control of the Cordoba Reactor is detailed. Also all the reasonswhich justify to continue with the congruent fosfatic method for the Atucha Reactor are analyzed. Some investigation objectives which would eventually permit the revision of the decisions taken on these subjects are proposed. (E.A.C.) [es

  12. Nuclear steam power plant cycle performance calculations supported by power plant monitoring and results computer

    International Nuclear Information System (INIS)

    Bettes, R.S.

    1984-01-01

    The paper discusses the real time performance calculations for the turbine cycle and reactor and steam generators of a nuclear power plant. Program accepts plant measurements and calculates performance and efficiency of each part of the cycle: reactor and steam generators, turbines, feedwater heaters, condenser, circulating water system, feed pump turbines, cooling towers. Presently, the calculations involve: 500 inputs, 2400 separate calculations, 500 steam properties subroutine calls, 200 support function accesses, 1500 output valves. The program operates in a real time system at regular intervals

  13. Power from biomass: the power utility perspective

    International Nuclear Information System (INIS)

    Serafimova, K.; Angele, H.-C.

    2008-01-01

    This article takes a look at possible strategies that electricity utilities in Switzerland could follow in order to be able to make use of biomass as a source of energy. Increasing interest in damp biomass as a relatively cheap, renewable and climate-friendly source of energy is commented on. Strategic choices that energy utilities have to make when they decide to enter into the biomass market are examined. The potentials involved are examined, including biogenic materials from domestic wastes and from agriculture. Figures on potential waste tonnage are quoted. Questions on subsidies and the free market are examined. The setting up of 'virtual power stations' - networks of installations using photovoltaic, wind and biomass - is discussed, as are various strategies that utilities can follow in this area. Examples of such 'virtual power stations' are listed.

  14. Strategy for utilizing nuclear power

    International Nuclear Information System (INIS)

    Martens, E.J.

    1977-01-01

    One of the national goals is to achieve independence in the area of energy supplies in the next few years. It is believed that attaining this goal will require extensive utilization of nuclear power in conventional fission reactors. It is proposed that the best way to develop the nuclear resource is through government ownership of the reactors. It is argued that this will minimize the risks associated with the nuclear-power option and clear the way for its exploitation

  15. Electric power generating plant having direct-coupled steam and compressed-air cycles

    Science.gov (United States)

    Drost, M.K.

    1981-01-07

    An electric power generating plant is provided with a Compressed Air Energy Storage (CAES) system which is directly coupled to the steam cycle of the generating plant. The CAES system is charged by the steam boiler during off peak hours, and drives a separate generator during peak load hours. The steam boiler load is thereby levelized throughout an operating day.

  16. Electric power generating plant having direct coupled steam and compressed air cycles

    Science.gov (United States)

    Drost, Monte K.

    1982-01-01

    An electric power generating plant is provided with a Compressed Air Energy Storage (CAES) system which is directly coupled to the steam cycle of the generating plant. The CAES system is charged by the steam boiler during off peak hours, and drives a separate generator during peak load hours. The steam boiler load is thereby levelized throughout an operating day.

  17. Nuclear steam turbines for power production in combination with heating

    International Nuclear Information System (INIS)

    Frilund, B.; Knudsen, K.

    1977-01-01

    The general operating conditions for nuclear steam turbines in district heating system are briefly outlined. The turbine plant can consist of essentially the same types of machines as in conventional district heating systems. Some possible arrangements of back-pressure turbines, back-pressure turbines with condensing tails, or condensing turbines with heat extraction are considered for nuclear power and heat stations. Principles of control for hot water temperature and electrical output are described. Optimization of the plant, considering parallel variations during the year between heat load, cooling water temperature, and required outgoing temperature is discussed. (U.K.)

  18. Utility requirements for fusion power

    International Nuclear Information System (INIS)

    DeBellis, R.J.

    1977-03-01

    A four-man month study was undertaken to identify utility requirements of fusion power and define a role for the utilities in the fusion development process during the 1980s. This report, preliminary in nature, serves mainly as a planning document for future requirements analyses. A requirements organization was defined to consist of three major chronological phases: research and development, plant installation, and plant operation. Thirty-seven requirements were identified, covering all categories. In addition, training, environment, safety, licensing, and utility model were identified as five matrix-type requirements. As the requirement definition process continued during the study period, comments received from utility representatives revealed a consistency of key issues in the fusion development process. These issues form the basis for the eventual establishment of definitive roles for the utilities during the 1980s. The issues are not meant to reflect a negative view of fusion, but are items that must be solved before fusion can be introduced commercially as an electrical power source. As a result of this requirements study, preliminary candidate roles for the utilities in the fusion development process during the 1980s were identified as public education, commercialization studies, industry investment analyses, training plan implementation, alternate reactor concept development, ERDA concept design review, and requirements refinement

  19. Utility requirements for fusion power

    International Nuclear Information System (INIS)

    DeBellis, R.J.

    1977-03-01

    A four-man-month study, jointly funded by EPRI and McDonnell Douglas Astronautics Company-EAST, was undertaken to identify the utility requirements of fusion power and define a role for the utilities in the fusion development process during the 1980's. This report, preliminary in nature, serves mainly as a planning document for future requirements analyses. A requirements organization was defined to consist of three major chronological phases: research and development, plant installation, and plant operation. Thirty-seven requirements were identified, covering all categories. In addition, training, environment, safety, licensing, and utility model were identified as five matrix-type requirements. As the requirement definition process continued during the study period, comments received from utility representatives revealed a consistency of key issues in the fusion development process. These issues form the basis for the eventual establishment of definitive roles for the utilities during the 1980's. The issues are not meant to reflect a negative view of fusion, but are items which must be solved before fusion can be introduced commercially as an electrical power source. As a result of this requirements study, preliminary candidate roles for the utilities in the fusion development process during the 1980's were identified as public education, commercialization studies, industry investment analyses, training plan implementation, alternate reactor concept development, ERDA concept design review, and requirements refinement

  20. Purchasing non-utility power

    International Nuclear Information System (INIS)

    Brackeen, L.G.

    1990-01-01

    The author discusses Houston Lighting and Power Company's procedure for purchasing power from cogenerators. By way of introduction, HL and P is the eighth largest electric utility in the United States in terms of kilowatt-hour sales and the second largest purchaser of natural gas in the nation. HL and P is also the principal utility providing electric service to the massive petrochemical industry in Southeast Texas. Of the 4,800 MW of cogeneration available, HL and P buys 945 MW under firm contracts, wheel 1,600 MW to other utilities, buy 400 MW under non-firm contracts and the balance is self-generation used to displace power which would otherwise be purchased from HL and P. With all this cogeneration capacity available, the problem until recently has been managing the surplus. HL and P now is finding itself in the unaccustomed position of needing to buy additional power or build plants to meet the modest growth it forecasts for Houston. The need for additional capacity coincides with the expiration of cogeneration contracts in 1993 and 1994. To meet this capacity need, they are determined to avoid buying cogeneration at a very high price and on delivery terms which do not reflect realistic benefits to their electric customers. The paper gives information on the background on PUC regulations and legislation, then briefly reviews the procedure for purchase of cogenerated power in Texas

  1. How EPRI [Electric Power Research Institute] helps utilities save money

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    A number of case studies are presented which illustrate how the work of the Electric Power Research Institute in the USA has enabled nuclear utilities to save money. The areas covered by the examples are: steam generator tube repair; streamlining of reliability centred maintenance; cost effective instrumentation and control maintenance; reducing the frequency of instrument calibration; optimising the engineering change process; detecting and reducing fuel failure; extending the qualified life of equipment. (U.K.)

  2. Power Sales to Electric Utilities

    Energy Technology Data Exchange (ETDEWEB)

    None

    1989-02-01

    The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of

  3. North Anna Power Station - Unit 1: Overview of steam generator replacement project activities

    International Nuclear Information System (INIS)

    Gettler, M.W.; Bayer, R.K.; Lippard, D.W.

    1993-01-01

    The original steam generators at Virginia Electric and Power Company's (Virginia Power) North Anna Power Station (NAPS) Unit 1 have experienced corrosion-related degradation that require periodic inspection and plugging of steam generator tubes to ensure their continued safe and reliable operation. Despite improvements in secondary water chemistry, continued tube degradation in the steam generators necessitated the removal from service of approximately 20.3 percent of the tubes by plugging, (18.6, 17.3, and 25.1 for steam generators A, B, and C, respectively). Additionally, the unit power was limited to 95 % during, its last cycle of operation. Projections of industry and Virginia Power experience indicated the possibility of mid-cycle inspections and reductions in unit power. Therefore, economic considerations led to the decision to repair the steam generators (i.e., replace the steam generator lower assemblies). Three new Model 51F Steam Generator lower assembly units were ordered from Westinghouse. Virginia Power contracted Bechtel Power Corporation to provide the engineering and construction support to repair the Unit 1 steam generators. On January 4, 1993, after an extended coastdown period, North Anna Unit 1 was brought off-line and the 110 day (breaker-to-breaker) Steam Generator Replacement Project (SGRP) outage began. As of this paper, the outage is still in progress

  4. Power-generation method using combined gas and steam turbines

    Energy Technology Data Exchange (ETDEWEB)

    Liu, C; Radtke, K; Keller, H J

    1997-03-20

    The invention concerns a method of power generation using a so-called COGAS (combined gas and steam) turbine installation, the aim being to improve the method with regard to the initial costs and energy consumption so that power can be generated as cheaply as possible. This is achieved by virtue of the fact that air taken from the surrounding atmosphere is splint into an essentially oxygen-containing stream and an essentially nitrogen-containing stream and the two streams fed further at approximately atmospheric pressure. The essentially nitrogen-containing stream is mixed with an air stream to form a mixed nitrogen/air stream and the mixed-gas stream thus produced is brought to combustion chamber pressure in the compressor of the gas turbine, the combustion of the combustion gases in the combustion chamber of the gas turbine being carried out with the greater part of this compressed mixed-gas stream. (author) figs.

  5. Outlook for gas turbine plant utilization in htgr power facilities

    International Nuclear Information System (INIS)

    Beknev, V.S.; Leont'ev, A.I.; Shmidt, K.L.; Surovtsev, I.G.

    1983-01-01

    The nuclear reactor power plants that have found greatest favor in the nuclear power industry worldwide are pressurized water reactors, boiling-water reactors, and uranium-graphite channel reactors with saturated-steam steam turbine units (PTU). The efficiency of power generating stations built around reactors such as these does not exceed 30 to 32%, and furthermore they are ''tied down'' to water reservoirs, with the entailed severe thermal effects on the environmental surroundings. The low efficiency range cited is evidence of inefficacious utilization of the nuclear fuel, reserves of which have their limits just as there are limits to available reserves of fossil fuels. Forecasts are being floated of a possible uranium crisis (profitable mining of uranium) in the mid-1990's, even with the expected development of breeder reactors to bridge the gap

  6. Drying system for steam generators, particularly for steam generators of nuclear power stations

    International Nuclear Information System (INIS)

    Lavalerie, Claude; Borrel, Christian.

    1982-01-01

    A drying system is described which allows for modular construction and which provides a significant available exchange area in a reduced volume. All the drying elements are identical and are distributed according to a ternay circular symmetry and are placed radially and associated to steam guiding facilities which alternately provide around the axis of revolution an output volume of dry steam from one element and an input volume of wet steam in the following element [fr

  7. Investigations to the potential of the high temperature reactor for steam power processes with highest steam conditions and comparison with according conventional power plants

    International Nuclear Information System (INIS)

    Mondry, M.

    1988-04-01

    Already in the fifties conventional power plants with high parameters of the live steam were built to improve the total efficiency. The power plant with the highest steam conditions in the Federal Republic of Germany has 300 bar pressure and 600deg C temperature. Because of high material costs and other problems power plants with such high conditions were not continued to be built. Standard conditions of today's power plants are in the order of 180-250 bar pressure and 535deg C temperature. As the high temperature reactor is partly built up in another way than a conventional power plant, the results regarding the high steam parameters are not transferable. Possibilities for the technical realization of determined HTR-specific components are introduced and discussed. Then different HTR-power plants with steam conditions up to 350 bar pressure and 650deg C temperature are projected. Economical considerations show that an HTR with higher steam parameters brings financial profits. Further efficiency increase, which is possible by the high steam conditions, is shortly presented. The work ends with a technical and economical comparison of corresponding conventional power plants. (orig./UA) [de

  8. Fuqing nuclear power of nuclear steam turbine generating unit No.1 at the implementation and feedback

    International Nuclear Information System (INIS)

    Cao Yuhua; Xiao Bo; He Liu; Huang Min

    2014-01-01

    The article introduces the Fuqing nuclear power of nuclear steam turbine generating unit no.l purpose, range of experience, experiment preparation, implementation, feedback and response. Turn of nuclear steam turbo-generator set flush, using the main reactor coolant pump and regulator of the heat generated by the electric heating element and the total heat capacity in secondary circuit of reactor coolant system (steam generator secondary side) of saturated steam turbine rushed to 1500 RPM, Fuqing nuclear power of nuclear steam turbine generating unit no.1 implementation of the performance of the inspection of steam turbine and its auxiliary system, through the test problems found in the clean up in time, the nuclear steam sweep turn smooth realization has accumulated experience. At the same time, Fuqing nuclear power of nuclear steam turbine generating unit no.1 at turn is half speed steam turbine generator non-nuclear turn at the first, with its smooth realization of other nuclear power steam turbine generator set in the field of non-nuclear turn play a reference role. (authors)

  9. Simulation of main steam and feedwater system of full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Zhao Xiaoyu

    1996-01-01

    The simulation of main steam and feedwater system is the most important and maximal part in secondary circuit model, including all of main steam and feedwater's thermal-hydraulic properties, except heat-exchange of secondary side of steam generator. It simulates main steam header, steam power in each stage of turbine, moisture separator-reheater, deaerator, condenser, high pressure and low pressure heater, auxiliary feedwater and main steam bypass in full scope

  10. 78 FR 41907 - Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point...

    Science.gov (United States)

    2013-07-12

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 423 [EPA-HQ-OW-2009-0819. FRL-9832-7; EPA-HQ-RCRA-2013-0209] RIN 2040-AF14 Effluent Limitations Guidelines and Standards for the Steam Electric Power... proposed rule entitled, ``Effluent Limitations Guidelines and Standards for the Steam Electric Power...

  11. Steam generation: fossil-fired systems: utility boilers; industrial boilers; boiler auxillaries; nuclear systems: boiling water; pressurized water; in-core fuel management; steam-cycle systems: condensate/feedwater; circulating water; water treatment

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    A survey of development in steam generation is presented. First, fossil-fired systems are described. Progress in the design of utility and industrial boilers as well as in boiler auxiliaries is traced. Improvements in coal pulverizers, burners that cut pollution and improve efficiency, fans, air heaters and economisers are noted. Nuclear systems are then described, including the BWR and PWR reactors, in-core fuel management techniques are described. Finally, steam-cycle systems for fossil-fired and nuclear power plants are reviewed. Condensate/feedwater systems, circulating water systems, cooling towers, and water treatment systems are discussed

  12. Exergy analysis and evolutionary optimization of boiler blowdown heat recovery in steam power plants

    International Nuclear Information System (INIS)

    Vandani, Amin Mohammadi Khoshkar; Bidi, Mokhtar; Ahmadi, Fatemeh

    2015-01-01

    Highlights: • Heat recovery of boiler blow downed water using a flash tank is modeled. • Exergy destruction of each component is calculated. • Exergy efficiency of the whole system is optimized using GA and PSO algorithms. • Utilizing the flash tank increases the net power and efficiency of the system. - Abstract: In this study, energy and exergy analyses of boiler blowdown heat recovery are performed. To evaluate the effect of heat recovery on the system performance, a steam power plant in Iran is selected and the results of implementation of heat recovery system on the power plant are investigated. Also two different optimization algorithms including GA and PSO are established to increase the plant efficiency. The decision variables are extraction pressure from steam turbine and temperature and pressure of boiler outlet stream. The results indicate that using blowdown recovery technique, the net generated power increases 0.72%. Also energy and exergy efficiency of the system increase by 0.23 and 0.22, respectively. The optimization results show that temperature and pressure of boiler outlet stream have a higher effect on the exergy efficiency of the system in respect to the other decision variables. Using optimization methods, exergy efficiency of the system reaches to 30.66% which shows a 1.86% augmentation with regard to the situation when a flash tank is implemented.

  13. Study of steam, helium and supercritical CO2 turbine power generations in prototype fusion power reactor

    International Nuclear Information System (INIS)

    Ishiyama, Shintaro; Muto, Yasushi; Kato, Yasuyoshi; Nishio, Satoshi; Hayashi, Takumi; Nomoto, Yasunobu

    2008-01-01

    Power generation systems such as steam turbine cycle, helium turbine cycle and supercritical CO 2 (S-CO 2 ) turbine cycle are examined for the prototype nuclear fusion reactor. Their achievable cycle thermal efficiencies are revealed to be 40%, 34% and 42% levels for the heat source outlet coolant temperature of 480degC, respectively, if no other restriction is imposed. In the current technology, however, low temperature divertor heat source is included. In this actual case, the steam turbine system and the S-CO 2 turbine system were compared in the light of cycle efficiency and plant cost. The values of cycle efficiency were 37.7% and 36.4% for the steam cycle and S-CO 2 cycle, respectively. The construction cost was estimated by means of component volume. The volume became 16,590 m 3 and 7240 m 3 for the steam turbine system and S-CO 2 turbine system, respectively. In addition, separation of permeated tritium from the coolant is much easier in S-CO 2 than in H 2 O. Therefore, the S-CO 2 turbine system is recommended to the fusion reactor system than the steam turbine system. (author)

  14. Power Plants, Steam and Gas Turbines WebQuest

    Directory of Open Access Journals (Sweden)

    Carlos Ulloa

    2012-10-01

    Full Text Available A WebQuest is an Internet-based and inquiry-oriented learning activity. The aim of this work is to outline the creation of a WebQuest entitled “Power Generation Plants: Steam and Gas Turbines.” This is one of the topics covered in the course “Thermodynamics and Heat Transfer,” which is offered in the second year of Mechanical Engineering at the Defense University Center at the Naval Academy in Vigo, Spain. While participating in the activity, students will be divided into groups of no more than 10 for seminars. The groups will create PowerPoint presentations that include all of the analyzed aspects. The topics to be discussed during the workshop on power plant turbines are the: (1 principles of operation; (2 processes involved; (3 advantages and disadvantages; (4 efficiency; (5 combined cycle; and (6 transversal competences, such as teamwork, oral and written presentations, and analysis and synthesis of information. This paper presents the use of Google Sites as a guide to the WebQuest so that students can access all information online, including instructions, summaries, resources, and information on qualifications.

  15. CDIO – The steam engine powering the electric grid

    DEFF Research Database (Denmark)

    Træholt, Chresten; Holbøll, Joachim; Thomsen, Ole Cornelius

    2011-01-01

    In building the new DTU B.Eng programme [1] one of the pilots on the 4’th semester is the Design-build project course in Electric Energy Systems. In this course, which is the last Designbuild course many of the CDIO Syllabus bullets [2] are addressed starting with problem identification and formu......In building the new DTU B.Eng programme [1] one of the pilots on the 4’th semester is the Design-build project course in Electric Energy Systems. In this course, which is the last Designbuild course many of the CDIO Syllabus bullets [2] are addressed starting with problem identification...... and formulation, experimental inquiry and modelling, finally leading to planning and solution. The goal is to acquire the skills that are needed for an engineer within electric power engineering to analyse a given task, define the necessary steps to solve the task, organize him/her self and others and finally...... solve the task with success. The concrete work is built up around a miniaturized electric energy system powered by a steam engine. The system mimics an essential sub-section of a real electric power system. The process is realised with a combination of optional lectures, optional exercises, 3 set...

  16. Prospects for Martensitic 12 % Cr Steels for Advanced Steam Power Plants

    DEFF Research Database (Denmark)

    Hald, John

    2016-01-01

    and FB2 are now used in power plants up to 600–620 °C steam temperature. For higher steam temperatures up to 650 °C steels with 11–12 % Cr are needed for better resistance against steam oxidation. However, fine V and Nb based nitrides may transform to coarse Z-phase [Cr(V,Nb)N] nitrides in steels...

  17. Steam generator tube failures: experience with water-cooled nuclear power reactors during 1976

    International Nuclear Information System (INIS)

    Tatone, O.S.; Pathania, R.S.

    1978-02-01

    A survey was conducted of experience with steam generator tubes at nuclear power stations during 1976. Failures were reported at 25 out of 68 water-cooled reactors. The causes of these failures and the repair and inspection procedures designed to cope with them are summarized. Examination of the data indicates that corrosion was the major cause of steam generator tube failures. Improvements are needed in steam generator design, condenser integrity and secondary water chemistry control. (author)

  18. Corrosion aspects in steam generators of nuclear power plants

    International Nuclear Information System (INIS)

    Visoni, E.; Santos Pinto, M. dos

    1988-01-01

    Steam generators of pressurized water reactors (PWR), transfer heat from a primary coolant system to a secondary coolant system. Primary coolant water is heated in the core and passes through the steam generator that transfer heat to the secondary coolant water. However, the steam generator is dead for ionic impurities, corrosion products and fabrication/maintenence residues. These impurities concentrate between crevice and cracks. Many types of degradation mechanisms affect the tubes. The tubes are dented, craked, ovalized, wasted, etc. This paper describes the main corrosion problems in steam generators and includes the corrective actions to considered to reduce or eliminate these corrosion problems. (author) [pt

  19. Business venture-analysis case study relating to the manufacture of gas turbines for the generation of utility electric power. Volume II. Private sector and public sector venture studies. Final report. [Use of coal gasifier with combined gas and steam system

    Energy Technology Data Exchange (ETDEWEB)

    Davison, W.R.

    1978-05-05

    Increasing national attention is being directed toward the search for clean, efficient, and reliable energy-conversion systems, capable of using abundant indigenous fuels such as coal, for generation of utility electric power. A prime candidate in this area is the combined gas and steam (COGAS) system employing a high-temperature gas turbine with a steam-turbine bottoming cycle, fed by a coal gasifier. This program demonstrates the use of a logical and consistent venture-analysis methodology which could also be applied to investigate other high-technology, energy-conversion systems that have yet to reach a state of commercialization but which are of significant interest to the U.S. Government. The venture analysis was performed by using a computer to model the development, production, sales, and in-service development phases of programs necessary to introduce new gas turbines in COGAS systems. The simulations were produced in terms of estimated cash flows, rates of returns, and risks which a manufacturer would experience. Similar simulations were used to estimate public-sector benefits resulting from the lower cost of power and improved environment gained from the use of COGAS systems rather than conventional systems. The study shows that substantial social benefits could be realized and private investment would be made by the gas-turbine manufacturers if an infusion of external funds were made during key portions of the gas-turbine development program. It is shown that there is substantial precedent for such public assistance to make possible economic and environmental benefits that otherwise would not be possible. 42 references.

  20. Arabelle: The most powerful steam turbine in the world

    International Nuclear Information System (INIS)

    Lamarque, F.; Deloroix, V.

    1998-01-01

    On the 30th of August 1996 at the CHOOZ power station in the Ardennes, the first 1,500 MW turbine was started up under nuclear steam and connected to the grid. It will reach full power in the spring of 1997, followed shortly afterwards by a second identical machine. This turbine, known as ARABELLE, is currently the most powerful in the world, with a single line rotating at 1,500 rpm. It has been entirely designed, manufactured and installed by the teams of GEC ALSTHOM, within the framework of the Electricite de France N4 PWR program. It represents a new type of nuclear turbine, the fruit of much research and development work which started in the 1980s. It benefits from GEC ALSTHOM's considerable experience in the field of nuclear turbines: 143 machines with a total power output of 100,000 MW and more than ten million hours of operation. It should be remembered that the first 1,000 MW unit for a PWR plant was connected at Fessenheim in 1977, and since then the different EDF plants have been equipped with 58 GEC ALSTHOM turbines, ranging from 1,000 MW to 1,350 MW, this providing the company with a vast amount of information. The process which led to a new design for ARABELLE was based on: Feedback of service experience from previous machines; this provides precious learning material with a view to improving the performance of operating equipment. Research and development work resulting in significant technical advances which could then be integrated into the design of a new generation of turbines. Taking account of the major concerns of the customer-user: Electricite de France (EDF): Improved reliability and operating availability, increased efficiency, reduced investment and maintenance costs

  1. Membrane steam reforming of natural gas for hydrogen production by utilization of medium temperature nuclear reactor

    International Nuclear Information System (INIS)

    Djati Hoesen Salimy

    2010-01-01

    The assessment of steam reforming process with membrane reactor for hydrogen production by utilizing of medium temperature nuclear reactor has been carried out. Difference with the conventional process of natural gas steam reforming that operates at high temperature (800-1000°C), the process with membrane reactor operates at lower temperature (~500°C). This condition is possible because the use of perm-selective membrane that separate product simultaneously in reactor, drive the optimum conversion at the lower temperature. Besides that, membrane reactor also acts the role of separation unit, so the plant will be more compact. From the point of nuclear heat utilization, the low temperature of process opens the chance of medium temperature nuclear reactor utilization as heat source. Couple the medium temperature nuclear reactor with the process give the advantage from the point of saving fossil fuel that give direct implication of decreasing green house gas emission. (author)

  2. Large steam turbines for nuclear power stations. Output growth prospects

    International Nuclear Information System (INIS)

    Riollet, G.; Widmer, M.; Tessier, J.

    1975-01-01

    The rapid growth of the output of nuclear reactors, even if temporary settlement occurs, leads the manufacturer to evaluate, at a given time, technological limitations encountered. The problems dealing with the main components of turbines: steam path, rotors and stators steam valves, controle devices, shafts and bearings, are reviewed [fr

  3. Steam turbines for nuclear power stations in Czechoslovakia and their use for district heating

    International Nuclear Information System (INIS)

    Drahy, J.

    1989-01-01

    The first generation of nuclear power stations in Czechoslavakia is equipped with 440 MW e pressurized water reactors. Each reactor supplies two 220 MW, 3000 rpm condensing type turbosets operating with saturated steam. After the completion of heating water piping systems, all of the 24 units of 220 MW in Czechoslovak nuclear power stations will be operated as dual purpose units, delivering both electricity and heat. At the present time, second-generation nuclear power stations, with 1000 MW e PWRs, are being built. Each such plant is equipped with one 1000 MW full-speed saturated steam turbine. The turbine is so designed as to permit the extraction of steam corresponding to the following quantities of heat: 893 MJ/s with three-stage water heating (150/60 0 C); and 570 MJ/s with two-stage water heating (120/60 0 C). The steam is taken from uncontrolled steam extraction points. (author)

  4. Steam generators under construction for the SNR-300 power plant

    Energy Technology Data Exchange (ETDEWEB)

    Essebaggers, J

    1975-07-01

    The prototype straight tube and the helical coil-steam generator has been designed and fabricated of which the straight tube steam generator has been successfully tested for over 3000 hours at prototypical conditions and is presently being dismantled for detailed examination of critical designed features. The prototype helical coil steam generator is presently under testing in the 50 MWt test facility at TNO-Hengelo with approximately 500 hours of operation at full load conditions. In an earlier presentation the design and fabrication of the prototype steam generators have been presented, while for this presentation the production units for SNR-300 will be discussed. Some preliminary information will be presented at this meeting of the dismantling operations of the prototype straight tube steam generator. (author)

  5. Steam generators under construction for the SNR-300 power plant

    International Nuclear Information System (INIS)

    Essebaggers, J.

    1975-01-01

    The prototype straight tube and the helical coil-steam generator has been designed and fabricated of which the straight tube steam generator has been successfully tested for over 3000 hours at prototypical conditions and is presently being dismantled for detailed examination of critical designed features. The prototype helical coil steam generator is presently under testing in the 50 MWt test facility at TNO-Hengelo with approximately 500 hours of operation at full load conditions. In an earlier presentation the design and fabrication of the prototype steam generators have been presented, while for this presentation the production units for SNR-300 will be discussed. Some preliminary information will be presented at this meeting of the dismantling operations of the prototype straight tube steam generator. (author)

  6. Thermal circuit and supercritical steam generator of the BGR-300 nuclear power plant

    International Nuclear Information System (INIS)

    Afanas'ev, B.P.; Godik, I.B.; Komarov, N.F.; Kurochnkin, Yu.P.

    1979-01-01

    Secondary coolant circuit and a steam generator for supercritical steam parameters of the BGR-300 reactor plant are described. The BGR-300 plant with a 300 MW(e) high-temperature gas-cooled fast reactor is developed as a pilot commercial plant. It is shown that the use of a supercritical pressure steam increases the thermal efficiency of the plant and descreases thermal releases to the environment, permits to use home-made commercial turbine plants of large unit power. The proposed supercritical pressure steam generator has considerable advantages from the viewpoint of heat transfer and hydrodynamical processes

  7. Biomass utilization at Northern States Power Company

    International Nuclear Information System (INIS)

    Ellis, R.P.

    1994-01-01

    Northern States Power Company (open-quotes NSPclose quotes) generates, transmits and distributes electricity and distributes natural gas to customers in Minnesota, Wisconsin, North Dakota, South Dakota and Michigan. An important and growing component of the fuel needed to generate steam for electrical production is biomass. This paper describes NSP's historical use of biomass, current biomass resources and an overview of how NSP plans to expand its use of biomass in the future

  8. Power generating system and method utilizing hydropyrolysis

    Science.gov (United States)

    Tolman, R.

    1986-12-30

    A vapor transmission cycle is described which burns a slurry of coal and water with some of the air from the gas turbine compressor, cools and cleans the resulting low-Btu fuel gas, burns the clean fuel gas with the remaining air from the compressor, and extracts the available energy in the gas turbine. The cycle lends itself to combined-cycle cogeneration for the production of steam, absorption cooling, and electric power.

  9. Research on simulation of supercritical steam turbine system in large thermal power station

    Science.gov (United States)

    Zhou, Qiongyang

    2018-04-01

    In order to improve the stability and safety of supercritical steam turbine system operation in large thermal power station, the body of the steam turbine is modeled in this paper. And in accordance with the hierarchical modeling idea, the steam turbine body model, condensing system model, deaeration system model and regenerative system model are combined to build a simulation model of steam turbine system according to the connection relationship of each subsystem of steam turbine. Finally, the correctness of the model is verified by design and operation data of the 600MW supercritical unit. The results show that the maximum simulation error of the model is 2.15%, which meets the requirements of the engineering. This research provides a platform for the research on the variable operating conditions of the turbine system, and lays a foundation for the construction of the whole plant model of the thermal power plant.

  10. Evaluation of Hybrid Power Plants using Biomass, Photovoltaics and Steam Electrolysis for Hydrogen and Power Generation

    Science.gov (United States)

    Petrakopoulou, F.; Sanz, J.

    2014-12-01

    Steam electrolysis is a promising process of large-scale centralized hydrogen production, while it is also considered an excellent option for the efficient use of renewable solar and geothermal energy resources. This work studies the operation of an intermediate temperature steam electrolyzer (ITSE) and its incorporation into hybrid power plants that include biomass combustion and photovoltaic panels (PV). The plants generate both electricity and hydrogen. The reference -biomass- power plant and four variations of a hybrid biomass-PV incorporating the reference biomass plant and the ITSE are simulated and evaluated using exergetic analysis. The variations of the hybrid power plants are associated with (1) the air recirculation from the electrolyzer to the biomass power plant, (2) the elimination of the sweep gas of the electrolyzer, (3) the replacement of two electric heaters with gas/gas heat exchangers, and (4) the replacement two heat exchangers of the reference electrolyzer unit with one heat exchanger that uses steam from the biomass power plant. In all cases, 60% of the electricity required in the electrolyzer is covered by the biomass plant and 40% by the photovoltaic panels. When comparing the hybrid plants with the reference biomass power plant that has identical operation and structure as that incorporated in the hybrid plants, we observe an efficiency decrease that varies depending on the scenario. The efficiency decrease stems mainly from the low effectiveness of the photovoltaic panels (14.4%). When comparing the hybrid scenarios, we see that the elimination of the sweep gas decreases the power consumption due to the elimination of the compressor used to cover the pressure losses of the filter, the heat exchangers and the electrolyzer. Nevertheless, if the sweep gas is used to preheat the air entering the boiler of the biomass power plant, the efficiency of the plant increases. When replacing the electric heaters with gas-gas heat exchangers, the

  11. Steam turbine generators for Sizewell 'B' nuclear power station

    International Nuclear Information System (INIS)

    Hesketh, J.A.; Muscroft, J.

    1990-01-01

    The thermodynamic cycle of the modern 3000 r/min steam turbine as applied at Sizewell 'B' is presented. Review is made of the factors affecting thermal efficiency including the special nature of the wet steam cycle and the use of moisture separation and steam reheating. Consideration is given to the optimization of the machine and cycle parameters, including particular attention to reheating and to the provision of feedheating, in order to achieve a high overall level of performance. A modular design approach has made available a family of machines suitable for the output range 600-1300 MW. The constructional features of the 630 MW Sizewell 'B' turbine generators from this range are described in detail. The importance of service experience with wet steam turbines and its influence on the design of modern turbines for pressurized water reactor (PWR) applications is discussed. (author)

  12. Fault tolerant control for steam generators in nuclear power plant

    International Nuclear Information System (INIS)

    Deng Zhihong; Shi Xiaocheng; Xia Guoqing; Fu Mingyu

    2010-01-01

    Based on the nonlinear system with stochastic noise, a bank of extended Kalman filters is used to estimate the state of sensors. It can real-time detect and isolate the single sensor fault, and reconstruct the sensor output to keep steam generator water level stable. The simulation results show that the methodology of employing a bank of extended Kalman filters for steam generator fault tolerant control design is feasible. (authors)

  13. Hydrogen-oxygen steam generator applications for increasing the efficiency, maneuverability and reliability of power production

    Science.gov (United States)

    Schastlivtsev, A. I.; Borzenko, V. I.

    2017-11-01

    The comparative feasibility study of the energy storage technologies showed good applicability of hydrogen-oxygen steam generators (HOSG) based energy storage systems with large-scale hydrogen production. The developed scheme solutions for the use of HOSGs for thermal power (TPP) and nuclear power plants (NPP), and the feasibility analysis that have been carried out have shown that their use makes it possible to increase the maneuverability of steam turbines and provide backup power supply in the event of failure of the main steam generating equipment. The main design solutions for the integration of hydrogen-oxygen steam generators into the main power equipment of TPPs and NPPs, as well as their optimal operation modes, are considered.

  14. Energy and economic optimization of a membrane-based oxyfuel steam power plant

    International Nuclear Information System (INIS)

    Nazarko, Yevgeniy

    2015-01-01

    Carbon capture and storage is one technological option for reducing CO 2 emissions. The oxyfuel process is based on the combustion of fossil fuels in an oxygen-flue gas atmosphere with the subsequent concentration of CO 2 . The oxygen is produced by cryogenic air separation with an energy demand of 245 kWh el /t O2 . The application of ceramic membranes has the potential to reduce the specific energy demand of oxygen supply with consistently high-purity oxygen. This work focuses on - determining the efficiency of an advanced oxyfuel steam power plant that can be constructed today using membranes for oxygen production, - investigating and quantifying the potential for energy optimizing the overall process by changing its flow structure, - assessing the feasibility of individual optimization options based on their investment costs under market conditions. For this work, a method developed by Forschungszentrum Juelich and patented on 25 April 2012 under EP 2214806 is used. The Oxy-Vac-Juel concept is integrated into the oxyfuel steam power plant with simple process management using standardized power plant components. The net efficiency of the base power plant is 36.6 percentage points for an oxygen separation degree of 60 %. This corresponds to a net power loss of 9.3 percentage points compared to the reference power plant without CO 2 capture. The specific electricity demand of this oxygen supply method is 176 kWh el /t O2 . To increase the efficiency, the flow structure of the base power plant is optimized using industrially available components from power plant and process engineering. The 22 analyzed optimization options consist of design optimization of the gas separation process, the modification of the flue gas recirculation and the plant-internal waste heat utilization. The energetic advantage over the base power plant, depending on the optimization option, ranges from 0.05 - 1.00 percentage points. For each optimization option, the size and cost of the power

  15. Possibilities of the metallurgical base in the manufacture of tubes for nuclear power plant steam generators

    International Nuclear Information System (INIS)

    Prnka, T.; Walder, V.; Dolenek, J.

    Current possibilities are briefly summarized of metallurgy in the manufacture of high-quality tubes for nuclear power plant steam generators, mainly for fast reactor power plants. Discussed are steel making possibilities, semi-finished product and tube forming with special regard to 2.25Cr1MoNiNb steel problems, heat treatment, finishing, and testing. Necessary equipment and technology for the production of steam generator tubes are less common in the existing practice and are demanding on investment; their introduction, however, is inevitable for securing quality production of steam generator tubes. (Kr)

  16. Integration between direct steam generation in linear solar collectors and supercritical carbon dioxide Brayton power cycles

    OpenAIRE

    Coco Enríquez, Luis; Muñoz Antón, Javier; Martínez-Val Peñalosa, José María

    2015-01-01

    Direct Steam Generation in Parabolic Troughs or Linear Fresnel solar collectors is a technology under development since beginning of nineties (1990's) for replacing thermal oils and molten salts as heat transfer fluids in concentrated solar power plants, avoiding environmental impacts. In parallel to the direct steam generation technology development, supercritical Carbon Dioxide Brayton power cycles are maturing as an alternative to traditional Rankine cycles for increasing net plant efficie...

  17. Steam generator assessment for sustainable power plant operation

    International Nuclear Information System (INIS)

    Drexler, Andreas; Fandrich, Joerg; Ramminger, Ute; Montaner-Garcia, Violeta

    2012-09-01

    Water and steam serve in the water-steam cycle as the energy transport and work media. These fluids shall not affect, through corrosion processes on the construction materials and their consequences, undisturbed plant operation. The main objectives of the steam water cycle chemistry consequently are: - The metal release rates of the structural materials shall be minimal - The probability of selective / localized forms of corrosion shall be minimal. - The deposition of corrosion products on heat transfer surfaces shall be minimized. - The formation of aggressive media, particularly local aggressive environments under deposits, shall be avoided. These objectives are especially important for the steam generators (SGs) because their condition is a key factor for plant performance, high plant availability, life time extension and is important to NPP safety. The major opponent to that is corrosion and fouling of the heating tubes. Effective ways of counteracting all degradation problems and thus of improving the SG performance are to keep SGs in clean conditions or if necessary to plan cleaning measures such as mechanical tube sheet lancing or chemical cleaning. Based on more than 40 years of experience in steam-water cycle water chemistry treatment AREVA developed an overall methodology assessing the steam generator cleanliness condition by evaluating all available operational and inspection data together. In order to gain a complete picture all relevant water chemistry data (e.g. corrosion product mass balances, impurity ingress), inspection data (e.g. visual inspections and tube sheet lancing results) and thermal performance data (e.g. heat transfer calculations) are evaluated, structured and indexed using the AREVA Fouling Index Tool Box. This Fouling Index Tool Box is more than a database or statistical approach for assessment of plant chemistry data. Furthermore the AREVA's approach combines manufacturer's experience with plant data and operates with an

  18. Utilizing Philippine Calatrava coal-diesel oil mixture (CDOM) as alternative fuel for industrial steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Archie B. Maglaya [De La Salle University, Manila (Philippines). Department of Mechanical Engineering

    2005-01-01

    The fast depletion of fuel oil and the continuous increase in the demand for power is a global issue. In the Philippines, the demand for diesel oil is expected to increase significantly in a 20-year period as projected by the Department of Energy. In line with the Philippine Government's thrust to lessen the dependence on imported energy, the agenda for the search for alternative fuel is highly prioritized. Thus, this paper presents the results of the study on performance analysis and efficiency test of a diesel oil fired industrial steam generator using Philippine Calatrava coal-diesel oil mixture (CDOM) as alternative fuel. A computer program was developed in HyperText Markup Language (HTML{copyright}) and JavaScript{copyright} to aid the computation of the adiabatic flame temperature from the governing system of equations based on the heat interaction between CDOM fuel, combustion air and products of combustion to determine the most desirable alternative fuel. Actual experimentation for the determination of CDOM fuel properties was also conducted to verify the alternative fuel selected through theoretical calculations. Results showed that the CDOM fuel with a particle size passing 75 {mu}m (-200 mesh) sieve having a proportion of 5% pulverized coal-95% diesel oil and 10% pulverized coal-90% diesel oil could be handled throughout the test with no degradation of the industrial steam generator. The steam generator efficiency using diesel oil is close to the steam generator efficiency using both CDOM fuels. 20 refs., 5 figs., 4 tabs.

  19. Hybrid preheat/recirculating steam generator

    International Nuclear Information System (INIS)

    Lilly, G.P.

    1985-01-01

    The patent describes a hybrid preheat/recirculating steam generator for nuclear power plants. The steam generator utilizes recirculated liquid to preheat incoming liquid. In addition, the steam generator incorporates a divider so as to limit the amount of recirculating water mixed with the feedwater. (U.K.)

  20. Specific safety aspects of the water-steam cycle important to nuclear power plant project

    International Nuclear Information System (INIS)

    Lobo, C.G.

    1986-01-01

    The water-steam cycle in a nuclear power plant is similar to that used in conventional power plants. Some systems and components are required for the safe nuclear power plant operation and therefore are designed according to the safety criteria, rules and regulations applied in nuclear installations. The aim of this report is to present the safety characteristics of the water-steam cycle of a nuclear power plant with pressurized water reactor, as applied for the design of the nuclear power plants Angra 2 and Angra 3. (Author) [pt

  1. Development and validation of advanced oxidation protective coatings for super critical steam power plant

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, M.B.; Scheefer, M. [Alstom Power Ltd., Rugby (United Kingdom); Agueero, A. [Instituto Nacional de Tecnica Aerospacial (INTA) (Spain); Allcock, B. [Monitor Coatings Ltd. (United Kingdom); Norton, B. [Indestructible Paints Ltd. (United Kingdom); Tsipas, D.N. [Aristotle Univ. of Thessaloniki (Greece); Durham, R. [FZ Juelich (Germany); Xiang, Z. [Northumbria Univ. (United Kingdom)

    2006-07-01

    Increasing the efficiency of coal-fired power plant by increasing steam temperatures and pressures brings benefits in terms of cheaper electricity and reduced emissions, particularly CO{sub 2}. In recent years the development of advanced 9%Cr ferritic steels with improved creep strength has enabled power plant operation at temperatures in excess of 600 C, such that these materials are being exploited to construct a new generation of advanced coalfired plant. However, the move to higher temperatures and pressures creates an extremely hostile oxidising environment. To enable the full potential of the new steels to be achieved, it is vital that protective coatings are developed, validated under high temperature steam and applied to candidate components from the steam path. This paper reviews recent work conducted within the Framework V project ''Coatings for Supercritical Steam Cycles'' (SUPERCOAT) to develop and demonstrate advanced slurry and thermal spray coatings capable of providing steam oxidation protection at temperatures in excess of 620 C and up to 300 bar. The programme of work has demonstrated the feasibility of applying a number of candidate coatings to steam turbine power plant components and has generated long-term steam oxidation rate and failure data that underpin the design and application work packages needed to develop and establish this technology for new and retrofit plant. (orig.)

  2. Steam supply and power cogeneration at Yanshan Petrochemical Co., Ltd.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a project was studied for the improvement of cogeneration facilities with steam supply of 600t/h and electric output of 55MW at Beijing Yanshan Petrochemical Co., China. In Plan A, fuel is changed from heavy oil to natural gas, and two heavy oil boilers are replaced with two gas turbines and two exhaust heat recovery steam generators for steam supply of 241t/h per unit and electric output of 136.9MW per unit. In Plan B, the boilers are replaced with three gas turbines and three exhaust heat recovery steam generators for steam supply of 210t/h per unit and electric output of 79.5MW per unit. The initial investment is 700 million yuan {+-} 100 million yuan in Plan A, and 500 million yuan {+-} 100 million yuan in Plan B. The generating cost is 0.403 yuan/kWh in Plan A, and 0.455 yuan/kWh in Plan B. It was concluded that without Plan A, the project will not be economically successful. In Plan A, the energy conservation will be 887,847 toe/y heavy oil equivalent, which increases productivity. Further, the amount of greenhouse effect gas emissions will be 2,747,187 t-CO2/y. (NEDO)

  3. Worldwide assessment of steam-generator problems in pressurized-water-reactor nuclear power plants

    International Nuclear Information System (INIS)

    Woo, H.H.; Lu, S.C.

    1981-01-01

    Objective is to assess the reliability of steam generators of pressurized water reactor (PWR) power plants in the United States and abroad. The assessment is based on operation experience of both domestic and foreign PWR plants. The approach taken is to collect and review papers and reports available from the literature as well as information obtained by contacting research institutes both here and abroad. This report presents the results of the assessment. It contains a general background of PWR plant operations, plant types, and materials used in PWR plants. A review of the worldwide distribution of PWR plants is also given. The report describes in detail the degradation problems discovered in PWR steam generators: their causes, their impacts on the performance of steam generators, and the actions to mitigate and avoid them. One chapter is devoted to operating experience of PWR steam generators in foreign countries. Another discusses the improvements in future steam generator design

  4. Design of large steam turbines for PWR power stations

    International Nuclear Information System (INIS)

    Hobson, G.; Muscroft, J.

    1983-01-01

    The thermodynamic cycle requirements for use with pressurized water reactors are reviewed and the manner in which thermal efficiency is maximised is outlined. The special nature of the wet steam cycle associated with turbines for this type of reactor is discussed. Machine and cycle parameters are optimised to achieve high thermal efficiency, particular attention being given to arrangements for water separation and steam reheating and to provisions for feedwater heating. Principles and details of mechanical design are considered for a range of both full-speed turbines running at 3000 rpm on 50 Hz systems and half-speed turbines running at 1800 rpm on 60 Hz systems. The importance of service experience with nuclear wet steam turbines and its relevance to the design of modern turbines for pressurized water reactor applications is discussed. (author)

  5. Water separator for a steam turbine for nuclear power stations

    International Nuclear Information System (INIS)

    Herzog, J.; Hubble, W.S.; Woods, K.K.

    1976-01-01

    The invention concerns a water separator for the condensation of humidity from steam of the inertia type, which has an improved flow distribution and can therefore be built for large dimensions. This is achieved by variation of the dimensions of the components of the liquid separator, particularly by the configuration of the drain trough, and by the fixing of suitable impact sheets, which produce turbulence and distribute the wet steam evenly over the separator elements. There is a detailed representation with drawings. (UW) [de

  6. Dual turbine power plant and a reheat steam bypass flow control system for use therein

    International Nuclear Information System (INIS)

    Braytenbah, A.S.; Jaegtnes, K.O.

    1977-01-01

    An electric power plant having dual turbine-generators connected to a steam source that includes a high temperature gas cooled nuclear reactor is described. Each turbine comprises a high pressure portion operated by superheat steam and an intermediate-low pressure portion operated by reheat steam; a bypass line is connected across each turbine portion to permit a desired minimum flow of steam from the source at times when the combined flow of steam through the turbine is less than the minimum. Coolant gas is propelled through the reactor by a circulator which is driven by an auxiliary turbine which uses steam exhausted from the high pressure portions and their bypass lines. The pressure of the reheat steam is controlled by a single proportional-plus-integral controller which governs the steam flow through the bypass lines associated with the intermediate-low pressure portions. At times when the controller is not in use its output signal is limited to a value that permits an unbiased response when pressure control is resumed, as in event of a turbine trip. 25 claims, 2 figures

  7. Effect of Low Pressure End Conditions on Steam Power Plant Performance

    Directory of Open Access Journals (Sweden)

    Ali Syed Haider

    2014-07-01

    Full Text Available Most of the electricity produced throughout the world today is from steam power plants and improving the performance of power plants is crucial to minimize the greenhouse gas emissions and fuel consumption. Energy efficiency of a thermal power plant strongly depends on its boiler-condenser operating conditions. The low pressure end conditions of a condenser have influence on the power output, steam consumption and efficiency of a plant. Hence, the objective this paper is to study the effect of the low pressure end conditions on a steam power plant performance. For the study each component was modelled thermodynamically. Simulation was done and the results showed that performance of the condenser is highly a function of its pressure which in turn depends on the flow rate and temperature of the cooling water. Furthermore, when the condenser pressure increases both net power output and plant efficiency decrease whereas the steam consumption increases. The results can be used to run a steam power cycle at optimum conditions.

  8. Nuclear power plant and apparatus for superheating steam

    International Nuclear Information System (INIS)

    Schluderberg, D.C.

    1983-01-01

    The invention consists of an apparatus for superheating steam, the apparatus comprising a horizontally disposed generally cylindrical elongate shell, inlet means in the shell for receiving steam, outlet means in the shell for discharching the steam, and a bundle of inclined tubes positioned in the flow path of the steam, each of the tubes having a length which is less than the diameter of the shell and opening into and extending in an upward direction from an outlet header to an inlet header, the inlet header beeing connected to a source of vapor, and the outlet header beeing connected to a condensate drain, characterised in that the test bundle comprises two banks of the tubes, the angle at which each of the tubes of one of the banks extends relative to a vertical longitudinal centerplane, the tubes of one of the banks terminate at and open into the inlet header, and the tubes of the other banks terminate at an open into another inlet header

  9. Safety analysis program for steam generators replacement and power uprate at Tihange 2 nuclear power plant

    International Nuclear Information System (INIS)

    Delhaye, X.; Charlier, A.; Damas, Ph.; Druenne, H.; Mandy, C.; Parmentier, F.; Pirson, J.; Zhang, J.

    2002-01-01

    The Belgian Tihange 2 nuclear power plant went into commercial operation in 1983 producing a thermal power of 2785 MW. Since the commissioning of the plant the steam generators U-tubes have been affected by primary stress corrosion cracking. In order to avoid further degradation of the performance and an increase in repair costs, Electrabel, the owner of the plant, decided in 1997 to replace the 3 steam generators. This decision was supported by the feasibility study performed by Tractebel Energy Engineering which demonstrated that an increase of 10% of the initial power together with a fuel cycle length of 18 months was achieved. Tractebel Energy Engineering was entrusted by Electrabel as the owner's engineer to manage the project. This paper presents the role of Tractebel Energy Engineering in this project and the safety analysis program necessary to justify the new operation point and the fuel cycle extension to 18 months re-analysis of FSAR chapter 15 accidents and verification of the capacity of the safety and auxiliary systems. The FSAR chapter 15 accidents were reanalyzed jointly by Framatome and Tractebel Energy Engineering while the systems verifications were carried out by Tractebel Energy Engineering. (author)

  10. Water chemistry and corrosion in water-steam circuits of nuclear power plants

    International Nuclear Information System (INIS)

    Gardent, R.; Menet, O.

    1981-01-01

    The water and steam circuits of steam generators in pressurized-water nuclear power plants are described together with the mechanism of denting, and the corrosion of spacer plates that leads to cracks in tubes by constriction. The different chemical specifications applicable to the water of the secondary circuit of the generators in normal operation and on first commissioning are listed. The results obtained and the measurements of chemical values taken in operation on the water in the secondary circuits of steam generators at Fessenheim and Bugey are presented [fr

  11. Design of a steam generator for PWR power plants and steady state simulation

    International Nuclear Information System (INIS)

    Ferreira, W.J.

    1982-01-01

    A procedure and a computer code for the thermal design of a steam generator for PWR power plants is developed. A vertical integral steam generator with inverted U-tubes and natural circulation of the secondary side is selected for modelling. Primary fluid velocity and recirculation ratio are varied to obtain the preliminary dimensions. Further, adjustments are made through iteractive solution of the equations of conservation of mass, energy and momentum. An agreement is found between design calculations for steam generators of different capacities and existing designs. (Author) [pt

  12. Microfabricated rankine cycle steam turbine for power generation and methods of making the same

    Science.gov (United States)

    Frechette, Luc (Inventor); Muller, Norbert (Inventor); Lee, Changgu (Inventor)

    2009-01-01

    In accordance with the present invention, an integrated micro steam turbine power plant on-a-chip has been provided. The integrated micro steam turbine power plant on-a-chip of the present invention comprises a miniature electric power generation system fabricated using silicon microfabrication technology and lithographic patterning. The present invention converts heat to electricity by implementing a thermodynamic power cycle on a chip. The steam turbine power plant on-a-chip generally comprises a turbine, a pump, an electric generator, an evaporator, and a condenser. The turbine is formed by a rotatable, disk-shaped rotor having a plurality of rotor blades disposed thereon and a plurality of stator blades. The plurality of stator blades are interdigitated with the plurality of rotor blades to form the turbine. The generator is driven by the turbine and converts mechanical energy into electrical energy.

  13. Steam condensation process in a power production cycle and heat exchanger for it

    International Nuclear Information System (INIS)

    Tondeur, Gerard; Andro, Jean; Marjollet, Jacques; Pouderoux, Pierre.

    1982-01-01

    Steam condensation process in a power production cycle by expansion in turbines, characterized by the fact that this condensation is performed by the vaporization of a coolant with a vaporization temperature at atmospheric pressure lower than that of water, and that the vaporized coolant fluid is expanded in a turbine and then condensed by heat exchange with cold water being heated, while the liquefied coolant is recompressed and used for heat exchange with the steam to be condensed [fr

  14. Energetic and exergetic analysis of a steam turbine power plant in an existing phosphoric acid factory

    International Nuclear Information System (INIS)

    Hafdhi, Fathia; Khir, Tahar; Ben Yahyia, Ali; Ben Brahim, Ammar

    2015-01-01

    Highlights: • The operating mode of the factory and the power supply streams are presented. • Energetic Analysis of steam turbine power plant of an existing phosphoric acid factory. • Exergetic Analysis of each component of steam turbine power plant and the different heat recovery system. • Energy, exergy efficiency and irreversibility rates for the main components are determined. • The effect of the operating parameters on the plant performance are analyzed. - Abstract: An energetic and exergetic analysis is conducted on a Steam Turbine Power Plant of an existing Phosphoric Acid Factory. The heat recovery systems used in the different parts of the plant are also considered in the study. Mass, energy and exergy balances are established on the main compounds of the plant. A numerical code is established using EES software to perform the calculations required for the thermal and exergy plant analysis considering real variation ranges of the main operating parameters such as pressure, temperature and mass flow rate. The effects of theses parameters on the system performances are investigated. The main sources of irreversibility are the melters, followed by the heat exchangers, the steam turbine generator and the pumps. The maximum energy efficiency is obtained for the blower followed by the heat exchangers, the deaerator and the steam turbine generator. The exergy efficiency obtained for the heat exchanger, the steam turbine generator, the deaerator and the blower are 88%, 74%, 72% and 66% respectively. The effects of High Pressure steam temperature and pressure on the steam turbine generator energy and exergy efficiencies are investigated.

  15. Dual turbine power plant and method of operating such plant, especially one having an HTGR steam supply

    International Nuclear Information System (INIS)

    Braytenbah, A.S.; Jaegtnes, K.O.

    1977-01-01

    A power plant including dual steam turbine-generators connected to pass superheat and reheat steam from a steam generator which derives heat from the coolant gas of a high temperature gas-cooled nuclear reactor is described. Associated with each turbine is a bypass line to conduct superheat steam in parallel with a high pressure turbine portion, and a bypass line to conduct superheat steam in parallel with a lower pressure turbine portion. Auxiliary steam turbines pass a portion of the steam flow to the reheater of the steam generator and drive gas blowers which circulate the coolant gas through the reactor and the steam source. Apparatus and method are disclosed for loading or unloading a turbine-generator while the other produces a steady power output. During such loading or unloading, the steam flows through the turbine portions are coordinated with the steam flows through the bypass lines for protection of the steam generator, and the pressure of reheated steam is regulated for improved performance of the gas blowers. 33 claims, 5 figures

  16. Thorium utilization in power reactors

    International Nuclear Information System (INIS)

    Saraceno; Marcos.

    1978-10-01

    In this work the recent (prior to Aug, 1976) literature on thorium utilization is reviewed briefly and the available information is updated. After reviewing the nuclear properties relevant to the thorium fuel cycle we describe briefly the reactor systems that have been proposed using thorium as a fertile material. (author) [es

  17. Design of large steam turbines for PWR power stations

    International Nuclear Information System (INIS)

    Hobson, G.

    1984-01-01

    The authors review the thermodynamic cycle requirements for use with pressurized-water reactors, outline the way thermal efficiency is maximized, and discuss the special nature of the wet-steam cycle associated with turbines for this type of reactor. Machine and cycle parameters are optimized to achieve high thermal efficiency, particular attention being given to arrangements for water separation and steam reheating and to provisions for feedwater heating. Principles and details of mechanical design are considered for a range both of full-speed turbines running at 3000 rev/min on 50 Hz systems and of half-speed turbines running at 1800 rev/min on 60 Hz systems. The importance of service experience with nuclear wet-stream turbines, and its relevance to the design of modern turbines for PWR applications, is discussed. (author)

  18. The development of control systems for high power steam turbines

    International Nuclear Information System (INIS)

    Mathey, M.

    1983-01-01

    The functional and technological aspects of developments in the field of control systems for steam turbines over the last twenty years are analyzed. These developments have now culminated in very sophisticated systems which closely link electronics to high pressure hydraulic technology. A detailed description of these systeme high-lighting the high technical level of the control methods and the flexibility and reliability in service of turbines controlled in this way is given [fr

  19. To Estimation of Efficient Usage of Organic Fuel in the Cycle of Steam Power Installations

    Directory of Open Access Journals (Sweden)

    A. P. Nesenchuk

    2013-01-01

    Full Text Available Tendencies of power engineering development in the world were shown in this article. There were carried out the thermodynamic Analysis of efficient usage of different types of fuel. This article shows the obtained result, which reflects that low-calorie fuel (from the point of thermodynamics is more efficient to use at steam power stations then high-energy fuel.

  20. Fast-Valving of Large Steam Turbine Units as a Means of Power System Security Enhancement

    OpenAIRE

    Bogdan Sobczak; Robert Rink; Rafał Kuczyński; Robert Trębski

    2014-01-01

    Fast-valving assists in maintaining system stability following a severe transmission system fault by reducing the turbine mechanical power. Fast-valving consists in rapid closing and opening of steam valves in an adequate manner to reduce the generator accelerating power following the recognition of a severe fault. FV can be an effective and economical method of meeting the performance requirements of a power system in the presence of an increase in wind and solar generation in the power syst...

  1. Exergy and exergoeconomic analysis of a petroleum refinery utilities plant using the condensing to power method

    Energy Technology Data Exchange (ETDEWEB)

    Mendes da Silva, Julio Augusto; Pellegrini, Luiz Felipe; Oliveira Junior, Silvio [Polytechnic School of the University of Sao Paulo, SP (Brazil)], e-mails: jams@usp.br, luiz.pellegrini@usp.br, soj@usp.br; Plaza, Claudio; Rucker, Claudio [Petrobras - Petroleo Brasileiro S.A., Rio de Janeiro, RJ (Brazil)], e-mails: claudioplaza@petrobras.com.br, rucker@petrobras.com.br

    2010-07-01

    In this paper a brief description of the main processes present in a modern high capacity refinery is done. The methodology used to evaluate, through exergy analysis, the performance of the refinery's utilities plant since it is responsible for a very considerable amount of the total exergy destruction in a refinery is presented. The utilities plant products: steam, electricity, shaft power and high pressure water had their exergy unit cost determined using exergoeconomic approach. A simple and effective method called condensing to power was used to define the product of the condensers in exergy basis. Using this method it is possible to define the product of the condenser without the use of negentropy concept nor the aggregation of condensers to the steam turbines. By using this new approach, the costs obtained for the plant's products are exactly the same costs obtained when the condenser is aggregated to the steam turbine but with the advantage that the information about the stream between condenser and the steam turbine is not lost and the condenser can be evaluated singly. The analysis shows that the equipment where attention and resources should be focused are the boilers followed by the gas turbine, that together, are responsible for 80% of total exergy destruction in the utilities plant. The total exergy efficiency found for the utilities plant studied is 35% while more than 280 MW of exergy is destroyed in the utilities processes. (author)

  2. Exergy Analysis of a Subcritical Reheat Steam Power Plant with Regression Modeling and Optimization

    Directory of Open Access Journals (Sweden)

    MUHIB ALI RAJPER

    2016-07-01

    Full Text Available In this paper, exergy analysis of a 210 MW SPP (Steam Power Plant is performed. Firstly, the plant is modeled and validated, followed by a parametric study to show the effects of various operating parameters on the performance parameters. The net power output, energy efficiency, and exergy efficiency are taken as the performance parameters, while the condenser pressure, main steam pressure, bled steam pressures, main steam temperature, and reheat steam temperature isnominated as the operating parameters. Moreover, multiple polynomial regression models are developed to correlate each performance parameter with the operating parameters. The performance is then optimizedby using Direct-searchmethod. According to the results, the net power output, energy efficiency, and exergy efficiency are calculated as 186.5 MW, 31.37 and 30.41%, respectively under normal operating conditions as a base case. The condenser is a major contributor towards the energy loss, followed by the boiler, whereas the highest irreversibilities occur in the boiler and turbine. According to the parametric study, variation in the operating parameters greatly influences the performance parameters. The regression models have appeared to be a good estimator of the performance parameters. The optimum net power output, energy efficiency and exergy efficiency are obtained as 227.6 MW, 37.4 and 36.4, respectively, which have been calculated along with optimal values of selected operating parameters.

  3. On economic efficiency of nuclear power unit life extension using steam-gas topping plant

    International Nuclear Information System (INIS)

    Kuznetsov, Y.N.; Lisitsa, F.D.; Smirnov, V.G.

    2001-01-01

    The different options for life extension of the operating nuclear power units have been analyzed in the report with regard for their economic efficiency. A particular attention is given to the option envisaging the reduction of reactor power output and its subsequent compensation with a steam-gas topping plant. Steam generated at its heat-recovery boilers is proposed to be used for the additional loading of the nuclear plant turbine so as to reach its nominal output. It would be demonstrated that the implementation of this option allows to reduce total costs in the period of power plant life extension by 24-29% as compared with the alternative use of the replacing steam-gas unit and the saved resources could be directed, for instance, for decommissioning of a reactor facility. (authors)

  4. Development of technologies on innovative-simplified nuclear power plant using high-efficiency steam injectors. (6) Operating characteristics of center water jet type supersonic steam injector

    International Nuclear Information System (INIS)

    Kawamoto, Yujiro; Abe, Yutaka; Iwaki, Chikako; Narabayashi, Tadashi; Mori, Michitsugu; Ohmori, Shuichi

    2004-01-01

    One of the most interesting devices for next generation reactor systems aiming at simplified system and improvement of safety and credibility is the steam injector which is a passive pump without large motor or turbo-machinery. One of the applications of the steam injector is the passive water injection system to inject the coolant water into the core. The system can be started up merely by injecting the steam without any outer power supply. Since the steam injector is a simple, compact and passive device for water injection, if the steam injector is applied to the actual reactor, it is expected to make the system simple and to reduce the construction cost. Although non-condensable gases are well known for reducing heat transfer between water and steam, the effect of the non-condensable gas on the condensation of supersonic steam on high-speed water jet has not been cleared. The present paper reports about the experimental apparatus, measurement instrument and experimental results of observing the phenomenon inside the test section supplying water and steam to the test by using both the high-speed camera and the video camera and measuring the temperature and the pressure distribution n the test section. (author)

  5. The main features of control and operation of steam turbines at nuclear power plants

    International Nuclear Information System (INIS)

    Czinkoczky, B.

    1981-01-01

    The output and speed control of steam turbines at nuclear power plants as well as the combination of both controls are reviewed and evaluated. At the same time the tasks of unit control at nuclear power plants, the control of steady main steam pressure and medium pressure of primary circuit, further the connection of reactor and turbine controls and the self-controlling properties of pressurized water reactor are dealt with. Hydraulic and electro-hydraulic speed control, the connection of cach-up dampers and speed control and the application of electro-hydraulic signal converters are discussed. The accomplishment of protection is also described. (author)

  6. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    International Nuclear Information System (INIS)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options

  7. Technical Feasible Study for Future Solar Thermal Steam Power Station in Malaysia

    Science.gov (United States)

    Bohari, Z. H.; Atira, N. N.; Jali, M. H.; Sulaima, M. F.; Izzuddin, T. A.; Baharom, M. F.

    2017-10-01

    This paper proposed renewable energy which is potential to be used in Malaysia in generating electricity to innovate and improve current operating systems. Thermal and water act as the resources to replace limited fossil fuels such as coal which is still widely used in energy production nowadays. Thermal is also known as the heat energy while the water absorbs energy from the thermal to produce steam energy. By combining both of the sources, it is known as thermal steam renewable energy. The targeted area to build this power station has constant high temperature and low humidity which can maximize the efficiency of generating power.

  8. The economic aspect of transition to power units with supercritical steam parameters

    Energy Technology Data Exchange (ETDEWEB)

    V.R. Kotler

    2007-09-15

    Information on the development and use of power units for supercritical and ultrasupercritical steam parameters in the United States, as well as in Europe and Japan, is presented. It is shown that increasing the parameters of steam reduces not only the fuel consumption, but also the specific emissions of toxic and greenhouse gases. Results of a calculation carried out at the EPRI (the United States) are presented, which show that it is advisable to construct power units for supercritical parameters only at certain (sufficiently high) price of the fuel being fired.

  9. Long term steam oxidation of TP 347H FG in power plants

    DEFF Research Database (Denmark)

    Hansson, Anette Nørgaard; Korcakova, Leona; Hald, John

    2005-01-01

    The long term oxidation behaviour of TP 347H FG at ultra supercritical steam conditions was assessed by exposing the steel in test superheater loops in a Danish coal-fired power plant. The steamside oxide layer was investigated with scanning electron microscopy and energy dispersive Xray diffract......The long term oxidation behaviour of TP 347H FG at ultra supercritical steam conditions was assessed by exposing the steel in test superheater loops in a Danish coal-fired power plant. The steamside oxide layer was investigated with scanning electron microscopy and energy dispersive Xray...

  10. Operational planning optimization of steam power plants considering equipment failure in petrochemical complex

    International Nuclear Information System (INIS)

    Luo, Xianglong; Zhang, Bingjian; Chen, Ying; Mo, Songping

    2013-01-01

    Highlights: ► We develop a systematic programming methodology to address equipment failure. ► We classify different operation conditions into real periods and virtual periods. ► The formulated MILP models guarantee cost reduction and enough operation safety. ► The consideration of reserving operation redundancy is effective. - Abstract: One or more interconnected steam power plants (SPPs) are constructed in a petrochemical complex to supply utility energy to the process. To avoid large economic penalties or process shutdowns, these SPPs should be flexible and reliable enough to meet the process energy requirement under varying conditions. Unexpected utility equipment failure is inevitable and difficult to be predicted. Most of the conventional methods are based on the assumption that SPPs do not experience any kind of equipment failure. Unfortunately, a process shutdown cannot be avoided when equipment fails unexpectedly. In this paper, a systematic methodology is presented to minimize the total cost under normal conditions while reserving enough flexibility and safety for unexpected equipment failure conditions. The proposed method transforms the different conditions into real periods to indicate normal scenarios and virtual periods to indicate unexpected equipment failure scenarios. The optimization strategy incorporating various operation redundancy scheduling, the transition constraints from equipment failure conditions to normal conditions, and the boiler load increase behavior modeling are presented to save cost and guarantee operation safety. A detailed industrial case study shows that the proposed systematic methodology is effective and practical in coping with equipment failure conditions with only few additional cost penalties

  11. Fast-Valving of Large Steam Turbine Units as a Means of Power System Security Enhancement

    Directory of Open Access Journals (Sweden)

    Bogdan Sobczak

    2014-03-01

    Full Text Available Fast-valving assists in maintaining system stability following a severe transmission system fault by reducing the turbine mechanical power. Fast-valving consists in rapid closing and opening of steam valves in an adequate manner to reduce the generator accelerating power following the recognition of a severe fault. FV can be an effective and economical method of meeting the performance requirements of a power system in the presence of an increase in wind and solar generation in the power system, newly connected large thermal units and delaying of building new transmission lines. The principle of fast-valving and advantages of applying this technique in large steam turbine units was presented in the paper. Effectiveness of fast-valving in enhancing the stability of the Polish Power Grid was analyzed. The feasibility study of fast-valving application in the 560 MW unit in Kozienice Power Station (EW SA was discussed.

  12. Materials, manufacture and testing of pressurized components of high-power steam power plants

    International Nuclear Information System (INIS)

    Blind, D.; Foehl, J.; Issler, L.; Schellhammer, W.; Sturm, D.; Kussmaul, K.; Heinrich, D.; Meyer, H.J.; Prestel, W.

    1981-01-01

    This is the first German review of materials, production and testing of pressure components of high-capacity steam power plants. The authors have been working in this field for years; their special subject has been the availability and reliability of pressure vessels, in particular in nuclear engineering. Fundamentals are presented as well as the findings obtained at the state Materials Testing Institute in Stuttgart. The material is presented in a well-structured classification; the most recent international findings, especially of the USA, are presented. This is possible due to the close cooperation between the Stuttgart institute and a number of US research institutes. The new subject of fracture mechanics is treated in some detail; its fundamentals are discussed from the American point of view while German considerations - in particular of the Reactor Safety Commission - are taken into account in the field of applications. (orig.) [de

  13. Theoretical and experimental study of a reactive steam jet in molten sodium. Application to the wastage of steam generators of FBR power plants

    International Nuclear Information System (INIS)

    Lestrat, Patrice.

    1982-11-01

    This study aims to analyze and explain the structure of a reactive jet of water steam in liquid sodium, as from a ligh pressure tank and an orifice of very small section. The prior understanding of this reactive jet makes it possible to explain certain results of erosion-corrosion (Wastage) that can occur in the steam generators of breader reactor power stations. This study gave rise to an experimental simulation (plane jet of water steam on a bed of sodium), as well as to suggesting a reactive jet model according to the principle of an ''immersed Na-H 2 O diffusion flame'' [fr

  14. Advanced energy utilization MHD power generation

    International Nuclear Information System (INIS)

    2008-01-01

    The 'Technical Committee on Advanced Energy Utilization MHD Power Generation' was started to establish advanced energy utilization technologies in Japan, and has been working for three years from June 2004 to May 2007. This committee investigated closed cycle MHD, open cycle MHD, and liquid metal MHD power generation as high-efficiency power generation systems on the earth. Then, aero-space application and deep space exploration technologies were investigated as applications of MHD technology. The spin-off from research and development on MHD power generation such as acceleration and deceleration of supersonic flows was expected to solve unstart phenomena in scramjet engine and also to solve abnormal heating of aircrafts by shock wave. In addition, this committee investigated researches on fuel cells, on secondary batteries, on connection of wind power system to power grid, and on direct energy conversion system from nuclear fusion reactor for future. The present technical report described results of investigations by the committee. (author)

  15. On the reliability of steam generator performance at nuclear power plants with WWER type reactors

    International Nuclear Information System (INIS)

    Styrikovich, M.A.; Margulova, T.Kh.

    1974-01-01

    The problem of ensuring reliable operation of steam generators in a nuclear power plant with a water-cooled, water-moderated reactor (WWER) was studied. At a nuclear power plant with a vertical steam generator (specifically, a Westinghouse product) the steam generator tubes were found to have been penetrated. Shutdown was due to corrosion disintegration of the austenitic stainless steel, type 18/8, used as pipe material for the heater surface. The corrosion was the result of the action of chlorine ions concentrated in the moisture contained in the iron oxide films deposited in low parts of the tube bundle, directly at the tube plate. Blowing through did not ensure complete removal of the film, and in some cases the construction features of the steam generator made removal of the film practically impossible. Replacement of type 18/8 stainless steel by other construction material, e.g., Inconel, did not give good results. To ensure reliable operation of vertical steam generators in domestic practice, the generators are designed without a low tube plate (a variant diagram of the vertical steam generator of such construction for the water-cooled, water-moderated reactor 1000 is presented). When low tube plates are used the film deposition is intolerable. For organization of a non-film regime a complex treatment of the feed water is used, in which the amount of complexion is calculated from the stoichmetric ratios with the composition of the feed water. It is noted that, if 100% condensate purification is used with complexon processing of the feed water to the generator, we can calculate the surface of the steam-generator heater without considering the outer placement on the tubes. In this the cost of the steam generator and all the nuclear power plants with WWER type reactors is decreased even with installation of a 100% condensate purification. It is concluded that only simultaneous solution of construction and water-regime problems will ensure relaible operation of

  16. Power plant and system for accelerating a cross compound turbine in such plant, especially one having an HTGR steam supply

    International Nuclear Information System (INIS)

    Jaegtnes, K.O.; Braytenbah, A.S.

    1977-01-01

    An electric power plant having a cross compound steam turbine and a steam source that includes a high temperature gas-cooled nuclear reactor is described. The steam turbine includes high and intermediate-pressure portions which drive a first generating means, and a low-pressure portion which drives a second generating means. The steam source supplies superheat steam to the high-pressure turbine portion, and an associated bypass permits the superheat steam to flow from the source to the exhaust of the high-pressure portion. The intermediate and low-pressure portions use reheat steam; an associated bypass permits reheat steam to flow from the source to the low-pressure exhaust. An auxiliary turbine driven by steam exhausted from the high-pressure portion and its bypass drives a gas blower to propel the coolant gas through the reactor. While the bypass flow of reheat steam is varied to maintain an elevated pressure of reheat steam upon its discharge from the source, both the first and second generating means and their associated turbines are accelerated initially by admitting steam to the intermediate and low-pressure portions. The electrical speed of the second generating means is equalized with that of the first generating means, whereupon the generating means are connected and acceleration proceeds under control of the flow through the high-pressure portion. 29 claims, 2 figures

  17. Burnout power in once-through tubular steam generators

    International Nuclear Information System (INIS)

    Campolunghi, F.; Cumo, M.; Ferrari, G.; Leo, R.; Vaccaro, G.

    1974-01-01

    The present experimental research provides experimental data in a design field where existing burnout correlations are usually extrapolated outside their validity range. Low surface heat fluxes and very long geometries typical of L.M.F.B.R. sodium heated steam generators require full scale water tests. 218 burnout qualities at pressures ranging from 60 to 160 kg/cm 2 and specific mass flowrates from 110 to 260 g/cm 2 s were measured and tested against the most known burnout correlations. Physically it appears that burnout quality is substantially independent from the flowrate, while a sharp subdivision with pressure suggests that for 60 less than p less than 90 kg/cm 2 and 110 less than p less than 160 kg/cm 2 two different burnout mechanisms may set up. (U.S.)

  18. Assessing the impact of primary measures for NOx reduction on the thermal power plant steam boiler

    International Nuclear Information System (INIS)

    Stupar, Goran; Tucaković, Dragan; Živanović, Titoslav; Belošević, Srdjan

    2015-01-01

    The European normatives prescribe content of 200 mg/Nm 3 NO x for pulverized coal combusting power plants. In order to reduce content of NO x in Serbian thermal power plant (TPP) 'Kostolac B' it's necessary to implement particular measures until 2016. The mathematical model of lignite combustion in the steam boiler furnace is defined and applied to analyze the possibility of implementing certain primary measures for reducing nitrogen oxides and their effects on the steam boiler operation. This model includes processes in the coal-fired furnace and defines radiating reactive two-phase turbulent flow. The model of turbulent flow also contains sub-model of fuel and thermal NO x formation and destruction. This complex mathematical model is related to thermal and aerodynamic calculations of the steam boiler within a unified calculation system in order to analyze the steam boiler overall work. This system provides calculations with a number of influential parameters. The steam boiler calculations for unit 1 (350 MWe) of TPP 'Kostolac B' are implemented for existing and modified combustion system in order to achieve effective, reliable and ecological facility work. The paper presents the influence analysis of large number of parameters on the steam boiler operation with an accepted concept of primary measures. Presented system of calculations is verified against measurements in TPP 'Kostolac B'. - Highlights: • Modern steam boilers need to operate according to ecological standards. • Possibility of applying some of the primary measures of NO x reduction. • Conventional calculations have no possibility to estimate sub-stoichiometric combustion. • Develop a new method of connecting the calculations. • Analysis shows the most favorable operation boiler regime (efficiency and ecology)

  19. 75 FR 82414 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Science.gov (United States)

    2010-12-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2010-0062] Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light... authorizes operation of the H.B. Robinson Steam Electric Plant, Unit 2 (HBRSEP). The license provides, among...

  20. 75 FR 11579 - Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Science.gov (United States)

    2010-03-11

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2010-0062] Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light... of the H. B. Robinson Steam Electric Plant, Unit 2 (HBRSEP). The license provides, among other things...

  1. Design and construction features of steam generators at a nuclear power station

    International Nuclear Information System (INIS)

    Chakrabarti, A.K.; Gupta, K.N.; Bapat, C.N.; Sharma, V.K.

    1996-01-01

    The Indian nuclear power programme is based on Pressurised Heavy Water Reactors (PHWRs) using natural uranium as fuel and heavy water as reactor coolant as well as moderator. The nuclear heat is generated in the fuel located in the pressure tubes. Pressurised heavy water in the primary heat transport (PHT) system is circulated through the tubes which picks up the heat from the fuel and transfers it to ordinary water in steam generators (SGs) to produce steam. The steam is used for providing power to the turbine. The steam generator is a critical equipment in the nuclear steam supply system (NSSS) of a nuclear reactor. SG tube surface area constitute about 80% of total primary circuit surface area. A typical value in a 220 MWe reactor is 9000 m 2 which can release considerable amount of corrosion products unless very low corrosion rates are achieved by proper design, material selection and water chemistry control. Design and construction features of SGs are given. 1 tab

  2. Evaluation of material integrity on electricity power steam generator cycles (turbine casing) component

    International Nuclear Information System (INIS)

    Histori; Benedicta; Farokhi; S A, Soedardjo; Triyadi, Ari; Natsir, M

    1999-01-01

    The evaluation of material integrity on power steam generator cycles component was done. The test was carried out on casing turbine which is made from Inconel 617. The tested material was taken from t anjung Priok plant . The evaluation was done by metallography analysis using microscope with magnification of 400. From the result, it is shown that the material grains are equiaxed

  3. Manufacture of the 300 MW steam generator and pressure stabilizer for Qinshan Nuclear Power Station

    International Nuclear Information System (INIS)

    Qian Yi; Miao Deming.

    1989-01-01

    A brief description of the manufacturing process of the steam generator and pressure stabilizer for 300 MWe Qinshan Nuclear Power Station in Shanghai Boiler Works is presented, with special emphasis on fabrication facilities, test procedures and technological evaluations during the manufaturing process-imcluding deep driling of tubesheets, welding of tubes to tube-sheets and tube rolling tests

  4. Steam-generator tube failures: world experience in water-cooled nuclear power reactors in 1974

    International Nuclear Information System (INIS)

    Hare, M.G.

    1976-01-01

    Steam-generator tube failures were reported at 25 of 59 water-cooled nuclear power reactors surveyed in 1974, compared to 11 of 49 in 1973. A summary is presented of these failures, most of which, where the cause is known, were the result of corrosion. Water chemistry control, inspection and repair procedures, and failure rates are discussed

  5. Citizen utilities: The emerging power paradigm

    International Nuclear Information System (INIS)

    Green, Jemma; Newman, Peter

    2017-01-01

    The emergence of citizen-based power systems in an integrated grid has been anticipated for decades. We can reveal how this is emerging in practice due to the significant uptake of solar photovoltaics (solar PV) and now battery storage in Perth, Australia. The high cost of electricity, high radiant energy levels and easy access to cheap Chinese technology, has led to dramatic buying during Perth's recent boomtown years. The traditional uni-directional power system is rapidly disrupting and this paper assesses where this may lead and what it means for the grid. Results of detailed monitoring in a solar powered house along with the impact of a battery storage system show the impact on the traditional grid is substantial but it will still be needed and must therefore adapt to the new distributed, bi-directional energy system. Surveys and price trajectories reveal how the trends to solar power storage will continue and how a citizen utility paradigm will emerge as the future grid building block using new blockchain support systems. Responses from utilities are then see to be fight, flight or innovate. - Highlights: • Citizen based power systems are emerging in Perth, Western Australia. • Solar power and battery storage systems are disrupting traditional utilities. • The grid will still have a role in the new, distributed power system. • The new system will lead to economic localism and the democratisation of power.

  6. Comprehensive investigation of process characteristics for oxy-steam combustion power plants

    International Nuclear Information System (INIS)

    Jin, Bo; Zhao, Haibo; Zou, Chun; Zheng, Chuguang

    2015-01-01

    Highlights: • Oxy-steam combustion exhibits better performance than oxy-CO 2 combustion. • Cost of electricity in oxy-steam combustion is 6.62% less than oxy-CO 2 combustion. • The increase of oxygen concentration in oxidant can improve its system performance. • The decrease of excess oxygen coefficient can be helpful for its system performance. • Integration with solar technology can enhance its thermodynamic performance. - Abstract: Oxy-steam combustion, as an alternative option of oxy-fuel combustion technology, is considered as a promising CO 2 capture technology for restraining CO 2 emissions from power plants. To attain its comprehensive process characteristics, process simulation, thermodynamic assessment, and sensitivity analysis for oxy-steam combustion pulverized-coal-fired power plants are investigated whilst its corresponding CO 2 /O 2 recycled combustion (oxy-CO 2 combustion) power plant is served as the base case for comparison. Techno-economic evaluation and integration with solar parabolic trough collectors are also discussed to justify its economic feasibility and improve its thermodynamic performance further, respectively. It is found that oxy-steam combustion exhibits better performance than oxy-CO 2 combustion on both thermodynamic and economic aspects, in which the cost of electricity decreases about 6.62% whilst the net efficiency and exergy efficiency increase about 0.90 and 1.01 percentage points, respectively. The increment of oxygen concentration in oxidant (20–45 mol.%) and decrease of excess oxygen coefficient (1.01–1.09) in a certain range are favorable for improving oxy-steam combustion system performance. Moreover, its thermodynamic performance can be improved when considering solar parabolic trough collectors for heating recycled water, even though its cost of electricity increases about 2 $/(MW h)

  7. Custom power - the utility solution to distribution power quality

    Energy Technology Data Exchange (ETDEWEB)

    Woodley, N H [Westinghouse Electric Corp., Pittsburgh, PA (United States)

    1997-04-01

    The design of custom power products for electric power distribution system was discussed. Problems with power quality that result in loss of production to critical processes are costly and create a problem for the customer as well as the electric utility. Westinghouse has developed power quality improvement equipment for customers and utilities, using new technologies based on power electronics concepts. The Distribution Static Compensator (DSTATCOM) is a fast response, solid-state power controller that provides flexible voltage control for improving power quality at the point of connection to the utility`s 4.16 to 69 kV distribution feeder. STATCOM is a larger version of the DSTATCOM that can be used to solve voltage flicker problems caused by electric arc furnaces. Westinghouse has also developed a Dynamic Voltage Restorer (DVR) which protects a critical customer plant load from power system voltage disturbances. Solid-State Breakers (SSB) have also been developed which offer a solution to many of the distribution system problems that result in voltage sags, swells, and power outages. 6 refs., 8 figs.

  8. Review of the coal-fired, over-supercritical and ultra-supercritical steam power plants

    Science.gov (United States)

    Tumanovskii, A. G.; Shvarts, A. L.; Somova, E. V.; Verbovetskii, E. Kh.; Avrutskii, G. D.; Ermakova, S. V.; Kalugin, R. N.; Lazarev, M. V.

    2017-02-01

    The article presents a review of developments of modern high-capacity coal-fired over-supercritical (OSC) and ultra-supercritical (USC) steam power plants and their implementation. The basic engineering solutions are reported that ensure the reliability, economic performance, and low atmospheric pollution levels. The net efficiency of the power plants is increased by optimizing the heat balance, improving the primary and auxiliary equipment, and, which is the main thing, by increasing the throttle conditions. As a result of the enhanced efficiency, emissions of hazardous substances into the atmosphere, including carbon dioxide, the "greenhouse" gas, are reduced. To date, the exhaust steam conditions in the world power industry are p 0 ≈ 30 MPa and t 0 = 610/620°C. The efficiency of such power plants reaches 47%. The OSC plants are being operated in Germany, Denmark, Japan, China, and Korea; pilot plants are being developed in Russia. Currently, a project of a power plant for the ultra-supercritical steam conditions p 0 ≈ 35 MPa and t 0 = 700/720°C with efficiency of approximately 50% is being studied in the EU within the framework of the Thermie AD700 program, project AD 700PF. Investigations in this field have also been launched in the United States, Japan, and China. Engineering solutions are also being sought in Russia by the All-Russia Thermal Engineering Research Institute (VTI) and the Moscow Power Engineering Institute. The stated steam parameter level necessitates application of new materials, namely, nickel-base alloys. Taking into consideration high costs of nickel-base alloys and the absence in Russia of technologies for their production and manufacture of products from these materials for steam-turbine power plants, the development of power plants for steam parameters of 32 MPa and 650/650°C should be considered to be the first stage in creating the USC plants as, to achieve the above parameters, no expensive alloys are require. To develop and

  9. ORCENT-2, Full Load Steam Turbine Cycle Thermodynamics for LWR Power Plant

    International Nuclear Information System (INIS)

    Fuller, L.C.

    1979-01-01

    1 - Description of problem or function: ORCENT-2 performs heat and mass balance calculations at valves-wide-open design conditions, maximum guaranteed rating conditions, and an approximation of part-load conditions for steam turbine cycles supplied with throttle steam, characteristic of contemporary light-water reactors. The program handles both condensing and back-pressure turbine exhaust arrangements. Turbine performance calculations are based on the General Electric Company method for 1800-rpm large steam turbine- generators operating with light-water-cooled nuclear reactors. Output includes all information normally shown on a turbine-cycle heat balance diagram. 2 - Method of solution: The turbine performance calculations follow the procedures outlined in General Electric report GET-6020. ORCENT-2 utilizes the 1967 American Society of Mechanical Engineers (ASME) formulations and procedures for calculating the properties of steam, adapted for ORNL use by D.W. Altom. 3 - Restrictions on the complexity of the problem: Maxima of: 12 feed-water heaters, 5 moisture removal stages in the low-pressure turbine section. ORCENT-2 is limited to 1800-rpm tandem-compound turbine-generators with single- or double-flow high pressure sections and one, two, or three double-flow low-pressure turbine sections. Steam supply for LWR cycles should be between 900 and 1100 psia and slightly wet to 100 degrees F of initial superheat. Generator rating should be greater than 100 MVA

  10. Steam generator life management

    International Nuclear Information System (INIS)

    Tapping, R.L.; Nickerson, J.; Spekkens, P.; Maruska, C.

    1998-01-01

    Steam generators are a critical component of a nuclear power reactor, and can contribute significantly to station unavailability, as has been amply demonstrated in Pressurized Water Reactors (PWRs). CANDU steam generators are not immune to steam generator degradation, and the variety of CANDU steam generator designs and tube materials has led to some unexpected challenges. However, aggressive remedial actions, and careful proactive maintenance activities, have led to a decrease in steam generator-related station unavailability of Canadian CANDUs. AECL and the CANDU utilities have defined programs that will enable existing or new steam generators to operate effectively for 40 years. Research and development work covers corrosion and mechanical degradation of tube bundles and internals, chemistry, thermal hydraulics, fouling, inspection and cleaning, as well as provision for specially tool development for specific problem solving. A major driving force is development of CANDU-specific fitness-for-service guidelines, including appropriate inspection and monitoring technology to measure steam generator condition. Longer-range work focuses on development of intelligent on-line monitoring for the feedwater system and steam generator. New designs have reduced risk of corrosion and fouling, are more easily inspected and cleaned, and are less susceptible to mechanical damage. The Canadian CANDU utilities have developed programs for remedial actions to combat degradation of performance (Gentilly-2, Point Lepreau, Bruce A/B, Pickering A/B), and have developed strategic plans to ensure that good future operation is ensured. This report shows how recent advances in cleaning technology are integrated into a life management strategy, discusses downcomer flow measurement as a means of monitoring steam generator condition, and describes recent advances in hideout return as a life management tool. The research and development program, as well as operating experience, has identified

  11. Some economic aspects of steam generator replacements in nuclear power plants

    International Nuclear Information System (INIS)

    Lebegner, J.

    1995-01-01

    The steam generator replacements performed over last decade (about 25 replacements until now), indicate trends towards improved techniques, shorter schedules and reduced total exposure and total costs. The goal of this paper is to give a worldwide review of SG replacement experience with accent on the economic aspect of the SG replacement. The main information about carried out replacements will be presented: cost, schedules, exposures, SG supplier and type, date of replacement, etc. Furthermore, the paper will contain the list of planned steam generator replacements in Europe, Japan and US future replacement plans. Finally, some of NPPs will be described whose initial nominal power has been increased along with SG replacement. (author)

  12. Optimized Application of MSR and Steam Turbine Retrofits in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Crossland, Robert; McCoach, John [ALSTOM Power, Willans Works, Newbold Road, Rugby, Warwickshire CV21 2NH (United Kingdom); Gagelin, Jean-Philippe [ALSTOM Power Heat Exchange, 19-21 avenue Morane-Saulnier, BP 65, 78143 Velizy Cedex (France)

    2004-07-01

    The benefit to a nuclear power plant from a steam turbine retrofit has often been clearly demonstrated in recent years but, for light water nuclear plants, the Moisture Separator Reheaters (MSRs) are also of prime importance. This paper describes how refurbishment of these crucial components can only provide full potential performance benefit when made in conjunction with a steam turbine retrofit (although in practice these activities are frequently separated). Examples are given to show how combined application is best handled within a single organization to ensure optimized integration into the thermal cycle. (authors)

  13. Studies and solutions of steam turbines for nuclear heating power stations

    International Nuclear Information System (INIS)

    Drahy, J.

    1979-01-01

    The possibilities of combined generation of heat and electric power and special features of the corresponding equipment for WWER type reactors are considered. Condensing steam turbines with bled steam points and the constructional solution of bled points are presented for heating the network water to 110 0 C, 120 0 C, and 160 0 C, respectively. The dimensions of the low pressure final stage of the turbine are given. Problems concerning condensing and bleeding turbines and combination types of back-pressure and condensing turbines as well as solutions to the design of 250 MW and 500 MW turbines are discussed

  14. Optimized Application of MSR and Steam Turbine Retrofits in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Crossland, Robert; McCoach, John; Gagelin, Jean-Philippe

    2004-01-01

    The benefit to a nuclear power plant from a steam turbine retrofit has often been clearly demonstrated in recent years but, for light water nuclear plants, the Moisture Separator Reheaters (MSRs) are also of prime importance. This paper describes how refurbishment of these crucial components can only provide full potential performance benefit when made in conjunction with a steam turbine retrofit (although in practice these activities are frequently separated). Examples are given to show how combined application is best handled within a single organization to ensure optimized integration into the thermal cycle. (authors)

  15. A connection of the steam generator feedwater section of WWER type nuclear power plants

    International Nuclear Information System (INIS)

    Matal, O.; Sadilek, J.

    1989-01-01

    In the feedwater piping of each steam generator, a plate for additional water pressure reduction is inserted before the first closing valve. During a steady water flow, the plate gives rise to a constant hydraulic resistance, bringing about steady reduction of the feedwater pressure; this also contributes to a stabilization of the feedwater flow rate into the steam generator. The control valve thus is stressed by minimal hydrodynamic forces. In this manner its load is decreased, its vibrations are damped, and the frequency of failures - and thereby the frequency of the nuclear power plant unit outages -is reduced. (J.P.). 1 fig

  16. Disposal of Steam Generators from Decommissioning of PWR Nuclear Power Plants

    International Nuclear Information System (INIS)

    Walberg, Mirko; Viermann, Joerg; Beverungen, Martin; Kemp, Lutz; Lindstroem, Anders

    2008-01-01

    Amongst other materials remarkable amounts of radioactively contaminated or activated scrap are generated from the dismantling of Nuclear Power Plants. These scrap materials include contaminated pipework, fittings, pumps, the reactor pressure vessel and other large components, most of them are heat exchangers. Taking into account all commercial and technical aspects an external processing and subsequent recycling of the material might be an advantageous option for many of these components. The disposal of steam generators makes up an especially challenging task because of their measures, their weight and compared to other heat exchangers high radioactive inventory. Based on its experiences from many years of disposal of smaller components of NPP still in operation or under decommissioning GNS and Studsvik Nuclear developed a concept for disposal of steam generators, also involving experiences made in Sweden. The concept comprises transport preparations and necessary supporting documents, the complete logistics chain, steam generator treatment and the processing of arising residues and materials not suitable for recycling. The first components to be prepared, shipped and treated according to this concept were four steam generators from the decommissioning of the German NPP Stade which were removed from the plant and shipped to the processing facility during the third quarter of 2007. Although the plant had undergone a full system decontamination, due to the remaining contamination in a number of plugged tubes the steam generators had to be qualified as industrial packages, type 2 (IP-2 packages), and according to a special requirement of the German Federal Office for Radiation Protection a license for a shipment under special arrangement had to be applied for. The presentation gives an overview of the calculations and evidences required within the course of the IP-2 qualification, additional requirements of the competent authorities during the licensing procedure as

  17. Steam turbine controls and their integration into power plants

    International Nuclear Information System (INIS)

    Kure-Jensen, J.; Hanisch, R.

    1989-01-01

    The main functions of a modern steam turbine control system are: speed and acceleration control during start-up; initialization of generator excitation; synchronization and application of load; pressure control of various forms: inlet, extraction backpressure, etc.; unloading and securing of the turbine; sequencing of the above functions under constraint of thermal stress overspeed protection during load rejection and emergencies; protection against serious hazards, e.g., loss of oil pressure, high bearing vibration; and testing of valves and vitally important protection functions. It is characteristic of the first group of functions that they must be performed with high control bandwidth, or very high reliability, or both, to ensure long-term satisfactory service of the turbine. It is for these reasons that GE has, from the very beginning of the technology, designed and provided the controls and protection for its units, starting with mechanical and hydraulic devices and progressing to analog electrohydraulic systems introduced in the 1960s, and now continuing with all-digital electrohydraulic systems

  18. Chemistry, materials and related problems in steam generators of power stations

    International Nuclear Information System (INIS)

    Mathur, P.K.

    2000-01-01

    The operational reliability and availability of power plants are considerably influenced by chemical factors. Researches all over the world indicate that several difficulties in power plants can be traced to off-normal or abnormal water chemistry conditions. Whatever the source of energy, be it fossil fuel or nuclear fuel, the ultimate aim is steam generation to drive a turbine. It is, therefore, natural that problems of water chemistry and material compatibility are similar in thermal and nuclear power stations. The present paper discusses various types of problems in the form of corrosion damages, taking place in the boiler-turbine cycles and describes different types of boiler feed water/boiler water treatments that have been in use both in nuclear and thermal power stations. Current positions in relation to requirements of boiler feed water, boiler water and steam quality have been described

  19. Design and development of steam generators for the AGR power stations at Heysham II/Torness

    Energy Technology Data Exchange (ETDEWEB)

    Charcharos, A N; Jones, A G [National Nuclear Corp. Ltd., Cheshire (United Kingdom)

    1984-07-01

    The current AGR steam generator design is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley/Hunterston AGR power stations. These units have demonstrated proven control and reliability in service. In this paper the factors which have dictated the design and layout of the latest AGR steam generators are described and reference made to the latest high temperature design techniques that have been employed. Details of development work to support the design and establish the performance characteristics over the range of plant operating conditions are also given. To comply with current UK safety standards, the AGR steam generators and associated plant are designed to accommodate seismic loadings. In addition, provision is made for an independent heat removal system for post reactor trip operations. (author)

  20. An afterburner-powered methane/steam reformer for a solid oxide fuel cells application

    Science.gov (United States)

    Mozdzierz, Marcin; Chalusiak, Maciej; Kimijima, Shinji; Szmyd, Janusz S.; Brus, Grzegorz

    2018-04-01

    Solid oxide fuel cell (SOFC) systems can be fueled by natural gas when the reforming reaction is conducted in a stack. Due to its maturity and safety, indirect internal reforming is usually used. A strong endothermic methane/steam reforming process needs a large amount of heat, and it is convenient to provide thermal energy by burning the remainders of fuel from a cell. In this work, the mathematical model of afterburner-powered methane/steam reformer is proposed. To analyze the effect of a fuel composition on SOFC performance, the zero-dimensional model of a fuel cell connected with a reformer is formulated. It is shown that the highest efficiency of a solid oxide fuel cell is achieved when the steam-to-methane ratio at the reforming reactor inlet is high.

  1. Design and development of steam generators for the AGR power stations at Heysham II/Torness

    International Nuclear Information System (INIS)

    Charcharos, A.N.; Jones, A.G.

    1984-01-01

    The current AGR steam generator design is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley/Hunterston AGR power stations. These units have demonstrated proven control and reliability in service. In this paper the factors which have dictated the design and layout of the latest AGR steam generators are described and reference made to the latest high temperature design techniques that have been employed. Details of development work to support the design and establish the performance characteristics over the range of plant operating conditions are also given. To comply with current UK safety standards, the AGR steam generators and associated plant are designed to accommodate seismic loadings. In addition, provision is made for an independent heat removal system for post reactor trip operations. (author)

  2. Particle Swarm Optimization to the U-tube steam generator in the nuclear power plant

    International Nuclear Information System (INIS)

    Ibrahim, Wesam Zakaria

    2014-01-01

    Highlights: • We establish stability mathematical model of steam generator and reactor core. • We propose a new Particle Swarm Optimization algorithm. • The algorithm can overcome premature phenomenon and has a high search precision. • Optimal weight of steam generator is 15.1% less than the original. • Sensitivity analysis and optimal design provide reference for steam generator design. - Abstract: This paper, proposed an improved Particle Swarm Optimization approach for optimize a U-tube steam generator mathematical model. The UTSG is one of the most important component related to safety of most of the pressurized water reactor. The purpose of this article is to present an approach to optimization in which every target is considered as a separate objective to be optimized. Multi-objective optimization is a powerful tool for resolving conflicting objectives in engineering design and numerous other fields. One approach to solve multi-objective optimization problems is the non-dominated sorting Particle Swarm Optimization. PSO was applied in regarding the choice of the time intervals for the periodic testing of the model of the steam generator

  3. Particle Swarm Optimization to the U-tube steam generator in the nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Ibrahim, Wesam Zakaria, E-mail: mimi9_m@yahoo.com

    2014-12-15

    Highlights: • We establish stability mathematical model of steam generator and reactor core. • We propose a new Particle Swarm Optimization algorithm. • The algorithm can overcome premature phenomenon and has a high search precision. • Optimal weight of steam generator is 15.1% less than the original. • Sensitivity analysis and optimal design provide reference for steam generator design. - Abstract: This paper, proposed an improved Particle Swarm Optimization approach for optimize a U-tube steam generator mathematical model. The UTSG is one of the most important component related to safety of most of the pressurized water reactor. The purpose of this article is to present an approach to optimization in which every target is considered as a separate objective to be optimized. Multi-objective optimization is a powerful tool for resolving conflicting objectives in engineering design and numerous other fields. One approach to solve multi-objective optimization problems is the non-dominated sorting Particle Swarm Optimization. PSO was applied in regarding the choice of the time intervals for the periodic testing of the model of the steam generator.

  4. Piping hydrodynamic loads for a PWR power up-rate with steam generator replacement

    International Nuclear Information System (INIS)

    Julie M Jarvis; Allen T Vieira; James M Gilmer

    2005-01-01

    Full text of publication follows: Pipe break hydrodynamic loads are calculated for various systems in a PWR for a Power Up-rate (PUR) with a Steam Generator Replacement (SGR). PUR with SGR can change the system pressures, mass flowrates and pipe routing/configuration. These changes can alter the steam generator piping steam/water hammer loads. This paper discusses the need to benchmark against the original design basis, the use of different modeling techniques, and lessons learned. Benchmarking for licensing in the United States is vital in consideration of 10CFR50.59 and other licensing and safety issues. RELAP5 and its force post-processor R5FORCE are used to model the transient loads for various piping systems such as main feedwater and blowdown systems. Other modeling applications, including the Bechtel GAFT program, are used to evaluate loadings in the main steam piping. Forces are calculated for main steam turbine stop valve closure, feedwater pipe breaks and subsequent check valve slam, and blowdown isolation valve closure. These PUR/SGR forces are compared with the original design basis forces. Modeling techniques discussed include proper valve closure modeling, sonic velocity changes due to pipe material changes, and two phase flow effects. Lessons learned based on analyses done for several PWR PUR with SGR are presented. Lessons learned from these analyses include choosing the optimal replacement piping size and routing to improve system performance without resulting in excessive piping loads. (authors)

  5. High efficiency, quasi-instantaneous steam expansion device utilizing fossil or nuclear fuel as the heat source

    International Nuclear Information System (INIS)

    Claudio Filippone

    1999-01-01

    Thermal-hydraulic analysis of a specially designed steam expansion device (heat cavity) was performed to prove the feasibility of steam expansions at elevated rates for power generation with higher efficiency. The steam expansion process inside the heat cavity greatly depends on the gap within which the steam expands and accelerates. This system can be seen as a miniaturized boiler integrated inside the expander where steam (or the proper fluid) is generated almost instantaneously prior to its expansion in the work-producing unit. Relatively cold water is pulsed inside the heat cavity, where the heat transferred causes the water to flash to steam, thereby increasing its specific volume by a large factor. The gap inside the heat cavity forms a special nozzle-shaped system in which the fluid expands rapidly, accelerating toward the system outlet. The expansion phenomenon is the cause of ever-increasing fluid speed inside the cavity system, eliminating the need for moving parts (pumps, valves, etc.). In fact, the subsequent velocity induced by the sudden fluid expansion causes turbulent conditions, forcing accelerating Reynolds and Nusselt numbers which, in turn, increase the convective heat transfer coefficient. When the combustion of fossil fuels constitutes the heat source, the heat cavity concept can be applied directly inside the stator of conventional turbines, thereby greatly increasing the overall system efficiency

  6. Preliminary design of steam reformer in out-pile demonstration test facility for HTTR heat utilization system

    Energy Technology Data Exchange (ETDEWEB)

    Haga, Katsuhiro; Hino, Ryutaro; Inagaki, Yosiyuki; Hata, Kazuhiko; Aita, Hideki; Sekita, Kenji; Nishihara, Tetsuo; Sudo, Yukio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Yamada, Seiya

    1996-11-01

    One of the key objectives of HTTR is to demonstrate effectiveness of high-temperature nuclear heat utilization system. Prior to connecting a heat utilization system to HTTR, an out-pile demonstration test is indispensable for the development of experimental apparatuses, operational control and safety technology, and verification of the analysis code of safety assessment. For the first heat utilization system of HTTR, design of the hydrogen production system by steam reforming is going on. We have proposed the out-pile demonstration test plan of the heat utilization system and conducted preliminary design of the test facility. In this report, design of the steam reformer, which is the principal component of the test facility, is described. In the course of the design, two types of reformers are considered. The one reformer contains three reactor tubes and the other contains one reactor tube to reduce the construction cost of the test facility. We have selected the steam reformer operational conditions and structural specifications by analyzing the steam reforming characteristics and component structural strength for each type of reformer. (author)

  7. IMPACT OF THE COLD END OPERATING CONDITIONS ON ENERGY EFFICIENCY OF THE STEAM POWER PLANTS

    Directory of Open Access Journals (Sweden)

    Slobodan Laković

    2010-01-01

    Full Text Available The conventional steam power plant working under the Rankine Cycle and the steam condenser as a heat sink and the steam boiler as a heat source have the same importance for the power plant operating process. Energy efficiency of the coal fired power plant strongly depends on its turbine-condenser system operation mode. For the given thermal power plant configuration, cooling water temperature or/and flow rate change generate alterations in the condenser pressure. Those changes have great influence on the energy efficiency of the plant. This paper focuses on the influence of the cooling water temperature and flow rate on the condenser performance, and thus on the specific heat rate of the coal fired plant and its energy efficiency. Reference plant is working under turbine-follow mode with an open cycle cooling system. Analysis is done using thermodynamic theory, in order to define heat load dependence on the cooling water temperature and flow rate. Having these correlations, for given cooling water temperature it is possible to determine optimal flow rate of the cooling water in order to achieve an optimal condensing pressure, and thus, optimal energy efficiency of the plant. Obtained results could be used as useful guidelines in improving existing power plants performances and also in design of the new power plants.

  8. Condition monitoring of steam turbo generators of captive power plant at HWP (Manuguru) through vibration analysis

    International Nuclear Information System (INIS)

    Krishnareddy, G.; Chandramouli, M.; Gupta, R.V.

    2002-01-01

    Turbo Generator is a critical equipment in steam based power plant circuit. Any failure causes loss of production and hence as applicable to Heavy Water Plant, Manuguru, it results in loss of heavy water production as the captive power plant at Manuguru is solely designed to supply steam and power to Main Plant, which is meant for production of heavy water. Thereby condition monitoring is very much essential and required as part of predictive maintenance program for the turbo generators which are in continuous operation. This paper focuses on identification of the turbo generator system through vibration spectrum, characterising and differentiating the fault mechanisms, trending the faults through changes in vibration spectrums and orbit plots and subsequently planning for corrective actions/measures after evaluating the changes in machine conditions

  9. Steam generators and fuel engineering utilizing solid, liquid, gaseous and special fuels

    Energy Technology Data Exchange (ETDEWEB)

    Thor, G

    1983-01-01

    Provided were technological specifications and details in the design of brown coal fired steam generators, produced in the German Democratic Republic. These steam generators range in their capacity between 1.6 and more than 1,000 t/h. The appropriate coal feeding systems, water supply and cleaning equipment, coal pulverizers and ash removal units are also manufactured. Various schemes show the design of a 25 to 64 t/h, a 320 t/h and an 815 t/h brown coal steam generator. Specifications are given for series of fuel pulverizers available, for the water circulation system and steam evaporators. The VEB Dampferzeugerbau Berlin also offers steam generators for saliniferous brown coal with a steam capacity up to 125 t/h, steam generators for pulverized black coal with a capacity up to 350 t/h and oil and gas fired generators up to 250 t/h. The company has experience in combustion of biomass (sugar cane waste) with oil in steam generators of more than 100 t/h capacity, and in projecting firing systems for other biofuels including rice, peanut and coconut hulls, wood and bark. Multi-biofuel firing in combination with coal for steam generation is also regarded as possible. (In English)

  10. Commercial Nuclear Steam-Electric Power Plants, Part II

    Science.gov (United States)

    Shore, Ferdinand J.

    1974-01-01

    Presents the pros and cons of nuclear power systems. Includes a discussion of the institutional status of the AEC, AEC regulatory record, routine low-level radiation hazards, transport of radioactive materials, storage of wastes, and uranium resources and economics of supply. (GS)

  11. Power plant and system for accelerating a cross compound turbine in such plant, especially one having an HTGR steam supply

    International Nuclear Information System (INIS)

    Jaegtnes, K.O.; Braytenbah, A.S.

    1979-01-01

    In accordance with the present invention, a power plant includes a steam source to generate superheat and reheat steam which flows through a turbine-generator and an associated bypass system. A high-pressure and an intermediate-pressure turbine portion drive a first electrical generating means, and a low-pressure turbine portion drives a second electrical generating means. A first flow of superheat steam flows through the high-pressure portion, while a second flow of reheat steam flows through the intermediate and low-pressure portions in succession. Provision is made for bypassing steam around the turbine portions; in particular, one bypass means permits a flow of superheat steam from the steam source to the exhaust of the high-pressure portion, and another bypass means allows reheated steam to pass from the source to the exhaust of the low-pressure portion. The first and second steam flows are governed independently. While one of such flows is varied for purposes of controlling the rotational speed of the first generating means according to a desired speed, the other flow is varied to regulate a power plant variable at its desired level. (author)

  12. Simulation of a Nuclear Steam Supply System (NSSS) of a PWR nuclear power plant

    International Nuclear Information System (INIS)

    Reis Martins Junior, L.L. dos.

    1980-01-01

    The following work intends to perform the digital simulation, of the Nuclear Steam Supply System (NSSS) of a PWR nuclear power plant for control systems design and analysis purposes. There are mathematical models for the reactor, the steam generator, the pressurizer and for transport lags of the coolant in the primary circuit. Nevertheless no one control system has been considered to permit any user the inclusion in the more convenient way of the desired control systems' models. The characteristics of the system in consideration are fundamentally equal to the ones of Almirante Alvaro Alberto Nuclear Power Plant, Unit I (Angra I) obtained in the Final Safety Analysis Report at Comissao Nacional de Energia Nuclear. (author)

  13. Experience with and techniques of diagnosing power plant steam turbines without dismantling

    International Nuclear Information System (INIS)

    Drapal, A.; Kopecek, K.

    1987-01-01

    Within the framework of vibration diagnostics of steam turbines at the Dukovany nuclear power plant the following factors were monitored: the summation signal of vibrations (usually the path of vibration movement), the time course of the vibration and the phase angle. In non-steady states also run-in and run-out curves, the absolute vibration of bearing stands and the relative vibration of the rotor are monitored. The method has so far not allowed to diagnose failures of antifriction bearings, loose parts, some gear box defects, the development of cracks in vanes, radial cracks in the disk, etc. Briefly characterized is the portable equipment which is available at the Dukovany nuclear power plant for vibration diagnostics of steam turbines. Suggestions are made for completing the system for monitoring service life, operation economics, the diagnosis of control circuits, etc. (Z.M.)

  14. Hydrogen and acoustic detection in steam generators of Super Phenix power plant

    International Nuclear Information System (INIS)

    Kong, N.; Le Bris, A.; Berthier, P.

    1986-05-01

    During the isothermal tests of Super-Phenix, two types of measurements were made on the steam generators with regard to the detection of water leaks into the sodium: - the first measurements enabled us to determine the characteristics (sensitivity, response time) of the hydrogen detectors that are already operational for the filling with water and the power operation of the steam generators. They also provided the basis for developing a prototype system for detecting very small water leaks (microleak phase). The other measurements concern the qualification tests of acoustic detectors which have been fitted for the first time to a major industrial installation. The results obtained are very satisfactory but final validation of the acoustic method will only occur after the full-power tests [fr

  15. Impact of drought on U.S. steam electric power plant cooling water intakes and related water resource management issues.

    Energy Technology Data Exchange (ETDEWEB)

    Kimmell, T. A.; Veil, J. A.; Environmental Science Division

    2009-04-03

    ) and type of plant (nuclear vs. fossil fuel). This is accomplished in Chapter 3. In Chapter 4, the nature of any compacts or agreements that give priority to users (i.e., which users must stop withdrawing water first) is examined. This is examined on a regional or watershed basis, specifically for western water rights, and also as a function of federal and state water management programs. Chapter 5 presents the findings and conclusions of this study. In addition to the above, a related intent of this study is to conduct preliminary modeling of how lowered surface water levels could affect generating capacity and other factors at different regional power plants. If utility managers are forced to take some units out of service or reduce plant outputs, the fuel mix at the remaining plants and the resulting carbon dioxide emissions may change. Electricity costs and other factors may also be impacted. Argonne has conducted some modeling based on the information presented in the database described in Chapter 2 of this report. A separate report of the modeling effort has been prepared (Poch et al. 2009). In addition to the U.S. steam electric power plant fleet, this modeling also includes an evaluation of power production of hydroelectric facilities. The focus of this modeling is on those power plants located in the western United States.

  16. Optimizing the Utility Power of a Geothermal Power Plant using Variable Frequency Drive (VFD) (Case Study: Sibayak Geothermal Power Plant)

    Science.gov (United States)

    Sinaga, R. H. M.; Manik, Y.

    2018-03-01

    Sibayak Geothermal Power Plant (SGPP) is one of the plants being developed by Pertamina Geothermal Energy (PGE) at the upstream phase. At the downstream phase, State - owned Electricity Company (PLN) through PT. Dizamatra Powerindo is the developer. The gross capacity of the power plant is 13.3 MW, consisting 1 unit of Monoblock (2 MW) developed by PGE and 2 units (2×5.65 MW) operated through Energy Sales Contract by PLN. During the development phase of a geothermal power plant, there is a chance to reduce the utility power in order to increase the overall plant efficiency. Reducing the utility power can be attempted by utilizing the wet bulb temperature fluctuation. In this study, a modeling process is developed by using Engineering Equation Solver (EES) software version 9.430. The possibility of energy saving is indicated by condenser pressure changes as a result of wet bulb temperature fluctuation. The result of this study indicates that the change of condenser pressure is about 50.8% on the constant liquid/gas (L/G) condition of the wet bulb temperature of 15°C to 25°C. Further result indicates that in this power plant, Cooling Tower Fan (CTF) is the facility that has the greatest utility load, followed by Hot Well Pump (HWP). The saving of the greatest utility load is applied trough Variable Frequency Drive (VFD) instrumentation. The result of this modeling has been validated by actual operations data (log sheet). The developed model has also been reviewed trough Specific Steam Consumption (SSC), resulting that constant L/G condition allows the optimum condition on of the wet bulb temperature of 15°C to 25°C.

  17. Detailed partial load investigation of a thermal energy storage concept for solar thermal power plants with direct steam generation

    Science.gov (United States)

    Seitz, M.; Hübner, S.; Johnson, M.

    2016-05-01

    Direct steam generation enables the implementation of a higher steam temperature for parabolic trough concentrated solar power plants. This leads to much better cycle efficiencies and lower electricity generating costs. For a flexible and more economic operation of such a power plant, it is necessary to develop thermal energy storage systems for the extension of the production time of the power plant. In the case of steam as the heat transfer fluid, it is important to use a storage material that uses latent heat for the storage process. This leads to a minimum of exergy losses during the storage process. In the case of a concentrating solar power plant, superheated steam is needed during the discharging process. This steam cannot be superheated by the latent heat storage system. Therefore, a sensible molten salt storage system is used for this task. In contrast to the state-of-the-art thermal energy storages within the concentrating solar power area of application, a storage system for a direct steam generation plant consists of a latent and a sensible storage part. Thus far, no partial load behaviors of sensible and latent heat storage systems have been analyzed in detail. In this work, an optimized fin structure was developed in order to minimize the costs of the latent heat storage. A complete system simulation of the power plant process, including the solar field, power block and sensible and latent heat energy storage calculates the interaction between the solar field, the power block and the thermal energy storage system.

  18. Thermal expansion measurement of turbine and main steam piping by using strain gages in power plants

    International Nuclear Information System (INIS)

    Na, Sang Soo; Chung, Jae Won; Bong, Suk Kun; Jun, Dong Ki; Kim, Yun Suk

    2000-01-01

    One of the domestic co-generation plants have undergone excessive vibration problems of turbine attributed to external force for years. The root cause of turbine vibration may be shaft alignment problem which sometimes is changed by thermal expansion and external force, even if turbine technicians perfectly performed it. To evaluate the alignment condition from plant start-up to full load, a strain measurement of turbine and main steam piping subjected to thermal loading is monitored by using strain gages. The strain gages are bonded on both bearing housing adjusting bolts and pipe stoppers which installed in the x-direction of left-side main steam piping near the turbine inlet in order to monitor closely the effect of turbine under thermal deformation of turbine casing and main steam piping during plant full load. Also in situ load of constant support hangers in main steam piping system is measured by strain gages and its results are used to rebalance the hanger rod load. Consequently, the experimental stress analysis by using strain gages turns out to be very useful tool to diagnose the trouble and failures of not only to stationary components but to rotating machinery in power plants

  19. Development of a water separator for steam drying in nuclear power plants

    International Nuclear Information System (INIS)

    Kall, H.

    1979-01-01

    In the wet steam of nuclear power plants with light water cooling the content of liquid phase before entering the high- and low-pressure turbine or at the inlet of the reheater connected in between is limited to a few parts per thousand. For the mechanical drying necessary to maintain this moisture limit there is suited the socalled lamellar separator, in which the vertical laminae, arranged one beside the other, confine a great number of separating ducts, bended in periodically changing sequence, through which wet steam is flowing. In the development of such a lamellar separator with internal drain channels described in this paper the droplet motion in the carrier gas stream and the discharge of the separated liquid is treated independently from each other. The mathematical and experimental study of the first-mentioned partial process leads to its complete description in a dimensionless separation diagram. During the subsequent discharge of the primarily separated droplet fluid there may be torn off droplets by the steam flow and carried away from the separator.The limit for the draining capacity reached with the occurrence of this phenomenon was determined in preliminary experiments with air and water and in experiments with wet steam carried out close to operating conditions. (orig.) 891 GL/orig. 892 RRD [de

  20. A high-power millimeter wave driven steam gun for pellet injectors

    International Nuclear Information System (INIS)

    Itoh, Yasuyuki

    1997-01-01

    A concept of steam gun is proposed for using in two-stage pneumatic hydrogen isotope pellet injectors. The steam gun is driven by megawatt-level high-power millimeter waves (∼100 GHz) supplied by gyrotrons. A small amount of water is injected into its pump tube. The water is instantaneously heated by the millimeter waves and vaporized. Generated high-pressure steam accelerates a piston for compressing light gas to drive a frozen pellet. Discussions in this paper concentrate on the piston acceleration. Results show that 1 MW millimeter waves accelerate the 25 g piston to velocities of ∼200 m/s in a 1 m-long pump tube. The piston acceleration characteristics are not improved in comparison to light gas guns with first valves. The steam gun concept, however, avoids the use of a large amount of high-pressure gas for piston accelerations. In future fusion reactors, gyrotrons used during preionization and start-up phase would be available for producing required millimeter waves. (author)

  1. Impact of steam generator start-up limitations on the performance of a parabolic trough solar power plant

    DEFF Research Database (Denmark)

    Ferruzza, Davide; Topel, Monika; Laumert, Björn

    2018-01-01

    typically start-up and shut down every day, so in order to maximize their profitability, it is necessary to increase their flexibility in transient operation and to initiate power generation as rapidly as possible. Two of the key components are the steam generator and steam turbine and the rates at which...... they can reach operational speed are limited by thermo-mechanical constraints. This paper presents an analysis of the effects of the thermal stress limitations of the steam generator and steam turbine on the power plant start-up, and quantifies their impact on the economy of the system. A dynamic model......-driven and peak-load. The results indicate that for steam generator hot start-ups, a 1.5% increase in peak-load electricity production would be achieved by doubling the maximum allowable heating rate of the evaporator. No useful increase would be achieved by increasing the rates beyond a limit of 7–8 K...

  2. Steam-generator tube performance: world experience with water-cooled nuclear power reactors during 1978

    International Nuclear Information System (INIS)

    Tatone, O.S.; Pathania, R.S.

    1980-01-01

    The performance of steam-generator tubes in water-cooled nuclear power reactors during 1978 is reviewed. Tube failures occurred at 31 of the 86 reactors surveyed. The causes of these failures and the procedures designed to deal with them are described. The number of tubes plugged has decreased dramatically in 1978 compared to the previous year. This is attributed to the diligent application of techniques developed through in-plant experience and research and development programs over the past several years

  3. Natural draft dry-type cooling tower for steam power plants

    International Nuclear Information System (INIS)

    Nasser, G.

    1976-01-01

    The task to build natural-draught dry cooling towers for large steam power plants as simple, compact, and economical as possible may be achieved by a combination of known features with the aid of the present application: the condenser elements built as piles of corrugated plates are arranged in the form of a truncated pyramid widened towards the top. For the cooling-air flow inlet openings for hot gas supplied from the lower part of the dome are provided. (UWI) [de

  4. Steam generator tube failures: world experience in water-cooled nuclear power reactors in 1975

    International Nuclear Information System (INIS)

    Hare, M.G.

    1976-11-01

    Steam generator tube failures were reported in 22 out of 62 water-cooled nuclear power plants surveyed in 1975. This was less than in 1974, and the number of the tubes affected was noticeably less. This report summarizes these failures, most of which were due to corrosion. Secondary-water chemistry control, procedures for inspection and repair, tube materials, and failure rates are discussed. (author)

  5. 3D model of steam generator of nuclear power plant Krsko

    International Nuclear Information System (INIS)

    Ravnikar, I.; Petelin, S.

    1995-01-01

    The Westinghouse Electric Corporation D4 steam generator design was analyzed from a thermal-hydraulic point of view using the 3D PHOENICS computer code. Void fraction, velocity and enthalpy distributions were obtained in the U-tube riser. The boundary conditions of primary side were provided by SMUP 1D code. The calculations were carried out for present operating conditions of nuclear power plant Krsko. (author)

  6. Steam generator tube performance: experience with water-cooled nuclear power reactors during 1977

    International Nuclear Information System (INIS)

    Pathania, R.S.; Tatone, O.S.

    1979-02-01

    The performance of steam generator tubes in water-cooled nuclear power reactors has been reviewed for 1977. Failures were reported in 34 of the 79 reactors surveyed. Causes of these failures and inspection and repair procedures designed to deal with them are presented. Although corrosion remained the leading cause of tube failures, specific mechanisms have been identified and methods of dealing with them developed. These methods are being applied and should lead to a reduction of corrosion failures in future. (author)

  7. Results of Steam-Water-Oxygen Treatment of the Inside of Heating Surfaces in Heat-Recovery Steam Generators of the PGU-800 Power Unit at the Perm' District Thermal Power Station

    Science.gov (United States)

    Ovechkina, O. V.; Zhuravlev, L. S.; Drozdov, A. A.; Solomeina, S. V.

    2018-05-01

    Prestarting, postinstallation steam-water-oxygen treatment (SWOT) of the natural circulation/steam reheat heat-recovery steam generators (HRSG) manufactured by OAO Krasny Kotelshchik was performed at the PGU-800 power unit of the Perm District Thermal Power Station (GRES). Prior to SWOT, steam-oxygen cleaning, passivation, and preservation of gas condensate heaters (GCH) of HRSGs were performed for 10 h using 1.3MPa/260°C/70 t/h external steam. After that, test specimens were cut out that demonstrated high strength of the passivating film. SWOT of the inside of the heating surfaces was carried out during no-load operation of the gas turbine unit with an exhaust temperature of 280-300°C at the HRSG inlet. The steam turbine was shutdown, and the generated steam was discharged into the atmosphere. Oxygen was metered into the discharge pipeline of the electricity-driven feed pumps and downcomers of the evaporators. The behavior of the concentration by weight of iron compounds and the results of investigation of cutout specimens by the drop or potentiometric method indicate that the steam-water-oxygen process makes it possible to remove corrosion products and reduce the time required to put a boiler into operation. Unlike other processes, SWOT does not require metal-intensive cleaning systems, temporary metering stations, and structures for collection of the waste solution.

  8. Innovative-Simplified Nuclear Power Plant Efficiency Evaluation with High-Efficiency Steam Injector System

    International Nuclear Information System (INIS)

    Shoji, Goto; Shuichi, Ohmori; Michitsugu, Mori

    2006-01-01

    It is possible to establish simplified system with reduced space and total equipment weight using high-efficiency Steam Injectors (SI) instead of low-pressure feedwater heaters in Nuclear Power Plant (NPP). The SI works as a heat exchanger through direct contact between feedwater from condensers and extracted steam from turbines. It can get higher pressure than supplied steam pressure. The maintenance and reliability are still higher than the feedwater ones because SI has no movable parts. This paper describes the analysis of the heat balance, plant efficiency and the operation of this Innovative-Simplified NPP with high-efficiency SI. The plant efficiency and operation are compared with the electric power of 1100 MWe-class BWR system and the Innovative-Simplified BWR system with SI. The SI model is adapted into the heat balance simulator with a simplified model. The results show that plant efficiencies of the Innovated-Simplified BWR system are almost equal to original BWR ones. The present research is one of the projects that are carried out by Tokyo Electric Power Company, Toshiba Corporation, and six Universities in Japan, funded from the Institute of Applied Energy (IAE) of Japan as the national public research-funded program. (authors)

  9. Recirculating steam generator operation at very low power

    International Nuclear Information System (INIS)

    Holcblat, A.

    2001-01-01

    The behaviour of recirculating SG's at very low power has been thoroughly investigated by laboratory and on-site tests as well as numerical simulations. A special experimental program dedicated to recirculation threshold determination has been performed on the Freon SG mock-up CLOTAIRE. These laboratory data are completed with transients of feedwater injections at hot stand-by on two instrumented SG's, one boiler type SG and one economizer type SG. The phenomena are different on both types. In boiler SG's, the SG behaves like a U-tube and recirculation stops around 2% load at stand-by temperature and water level. In economizer SG's, the presence of 2 separate down-comers and a divider plate inside the tube bundle allows a recirculation loop by-passing the separators. The mixing of saturated and cold water induced by this loop limits down-comer cooling and thus alleviates the thermal load on the tube sheet. These tests were used to validate the SG transient analysis 1-D code ANETH. (author)

  10. Limits to the Recognizability of Flaws in Non-Destructive Testing Steam-Generator Tubes for Nuclear-Power Plants

    International Nuclear Information System (INIS)

    Kuhlmann, A.; Adamsky, F.-J.

    1965-01-01

    In the Federal Republic of Germany there are nuclear reactors under construction with steam generators inside the reactor pressure-vessel. As a result design repairs of steam- generator tubes are very difficult and cause large shut-down times of the nuclear-power plant. It is known that numerous troubles in operating conventional power plants are results of steam-generator tube damages. Because of the high total costs of these reactors it. is necessary to construct the steam generators especially in such a manner that the load factor of the power plant is as high as possible. The Technischer Überwachungs-Verein Rheinland was charged to supervise and to test fabrication and construction of the steam generators to see that this part of the plant was as free of defects as possible. The experience gained during this work is of interest for manufacture and construction of steam generators for nuclear-power plants in general. This paper deals with the efficiency limits of non-destructive testing steam-generator tubes. The following tests performed will be discussed in detail: (a) Automatic ultrasonic testing of the straight tubes in the production facility; (b) Combined ultrasonic and radiographic testing of the bent tubes and tube weldings; (c) Other non-destructive tests. (author) [fr

  11. Steam Generator control in Nuclear Power Plants by water mass inventory

    Energy Technology Data Exchange (ETDEWEB)

    Dong Wei [North Carolina State University, Department of Nuclear Engineering, Box 7909, Raleigh, NC 27695-7909 (United States); Doster, J. Michael [North Carolina State University, Department of Nuclear Engineering, Box 7909, Raleigh, NC 27695-7909 (United States)], E-mail: doster@eos.ncsu.edu; Mayo, Charles W. [North Carolina State University, Department of Nuclear Engineering, Box 7909, Raleigh, NC 27695-7909 (United States)

    2008-04-15

    Control of water mass inventory in Nuclear Steam Generators is important to insure sufficient cooling of the nuclear reactor. Since downcomer water level is measurable, and a reasonable indication of water mass inventory near steady-state, conventional feedwater control system designs attempt to maintain downcomer water level within a relatively narrow operational band. However, downcomer water level can temporarily react in a reverse manner to water mass inventory changes, commonly known as shrink and swell effects. These complications are accentuated during start-up or low power conditions. As a result, automatic or manual control of water level is difficult and can lead to high reactor trip rates. This paper introduces a new feedwater control strategy for Nuclear Steam Generators. The new method directly controls water mass inventory instead of downcomer water level, eliminating complications from shrink and swell all together. However, water mass inventory is not measurable, requiring an online estimator to provide a mass inventory signal based on measurable plant parameters. Since the thermal-hydraulic response of a Steam Generator is highly nonlinear, a linear state-observer is not feasible. In addition, difficulties in obtaining flow regime and density information within the Steam Generator make an estimator based on analytical methods impractical at this time. This work employs a water mass estimator based on feedforward neural networks. By properly choosing and training the neural network, mass signals can be obtained which are suitable for stable, closed-loop water mass inventory control. Theoretical analysis and simulation results show that water mass control can significantly improve the operation and safety of Nuclear Steam Generators.

  12. Steam Generator control in Nuclear Power Plants by water mass inventory

    International Nuclear Information System (INIS)

    Dong Wei; Doster, J. Michael; Mayo, Charles W.

    2008-01-01

    Control of water mass inventory in Nuclear Steam Generators is important to insure sufficient cooling of the nuclear reactor. Since downcomer water level is measurable, and a reasonable indication of water mass inventory near steady-state, conventional feedwater control system designs attempt to maintain downcomer water level within a relatively narrow operational band. However, downcomer water level can temporarily react in a reverse manner to water mass inventory changes, commonly known as shrink and swell effects. These complications are accentuated during start-up or low power conditions. As a result, automatic or manual control of water level is difficult and can lead to high reactor trip rates. This paper introduces a new feedwater control strategy for Nuclear Steam Generators. The new method directly controls water mass inventory instead of downcomer water level, eliminating complications from shrink and swell all together. However, water mass inventory is not measurable, requiring an online estimator to provide a mass inventory signal based on measurable plant parameters. Since the thermal-hydraulic response of a Steam Generator is highly nonlinear, a linear state-observer is not feasible. In addition, difficulties in obtaining flow regime and density information within the Steam Generator make an estimator based on analytical methods impractical at this time. This work employs a water mass estimator based on feedforward neural networks. By properly choosing and training the neural network, mass signals can be obtained which are suitable for stable, closed-loop water mass inventory control. Theoretical analysis and simulation results show that water mass control can significantly improve the operation and safety of Nuclear Steam Generators

  13. Thermal analysis of heat and power plant with high temperature reactor and intermediate steam cycle

    Directory of Open Access Journals (Sweden)

    Fic Adam

    2015-03-01

    Full Text Available Thermal analysis of a heat and power plant with a high temperature gas cooled nuclear reactor is presented. The main aim of the considered system is to supply a technological process with the heat at suitably high temperature level. The considered unit is also used to produce electricity. The high temperature helium cooled nuclear reactor is the primary heat source in the system, which consists of: the reactor cooling cycle, the steam cycle and the gas heat pump cycle. Helium used as a carrier in the first cycle (classic Brayton cycle, which includes the reactor, delivers heat in a steam generator to produce superheated steam with required parameters of the intermediate cycle. The intermediate cycle is provided to transport energy from the reactor installation to the process installation requiring a high temperature heat. The distance between reactor and the process installation is assumed short and negligable, or alternatively equal to 1 km in the analysis. The system is also equipped with a high temperature argon heat pump to obtain the temperature level of a heat carrier required by a high temperature process. Thus, the steam of the intermediate cycle supplies a lower heat exchanger of the heat pump, a process heat exchanger at the medium temperature level and a classical steam turbine system (Rankine cycle. The main purpose of the research was to evaluate the effectiveness of the system considered and to assess whether such a three cycle cogeneration system is reasonable. Multivariant calculations have been carried out employing the developed mathematical model. The results have been presented in a form of the energy efficiency and exergy efficiency of the system as a function of the temperature drop in the high temperature process heat exchanger and the reactor pressure.

  14. Advanced steam power plant concepts with optimized life-cycle costs: A new approach for maximum customer benefit

    Energy Technology Data Exchange (ETDEWEB)

    Seiter, C.

    1998-07-01

    The use of coal power generation applications is currently enjoying a renaissance. New highly efficient and cost-effective plant concepts together with environmental protection technologies are the main factors in this development. In addition, coal is available on the world market at attractive prices and in many places it is more readily available than gas. At the economical leading edge, standard power plant concepts have been developed to meet the requirements of emerging power markets. These concepts incorporate the high technological state-of-the-art and are designed to achieve lowest life-cycle costs. Low capital cost, fuel costs and operating costs in combination with shortest lead times are the main assets that make these plants attractive especially for IPPs and Developers. Other aspects of these comprehensive concepts include turnkey construction and the willingness to participate in BOO/BOT projects. One of the various examples of such a concept, the 2 x 610-MW Paiton Private Power Project Phase II in Indonesia, is described in this paper. At the technological leading edge, Siemens has always made a major contribution and was pacemaker for new developments in steam power plant technology. Modern coal-fired steam power plants use computer-optimized process and plant design as well as advanced materials, and achieve efficiencies exceeding 45%. One excellent example of this high technology is the world's largest lignite-fired steam power plant Schwarze Pumpe in Germany, which is equipped with two 800 MW Siemens steam turbine generators with supercritical steam parameters. The world's largest 50-Hz single-shaft turbine generator with supercritical steam parameters rated at 1025 MW for the Niederaussem lignite-fired steam power plant in Germany is a further example of the sophisticated Siemens steam turbine technology and sets a new benchmark in this field.

  15. Steam drums

    International Nuclear Information System (INIS)

    Crowder, R.

    1978-01-01

    Steam drums are described that are suitable for use in steam generating heavy water reactor power stations. They receive a steam/water mixture via riser headers from the reactor core and provide by means of separators and driers steam with typically 0.5% moisture content for driving turbines. The drums are constructed as prestressed concrete pressure vessels in which the failure of one or a few of the prestressing elements does not significantly affect the overall strength of the structure. The concrete also acts as a radiation shield. (U.K.)

  16. Commissioning and maintenance experience on mechanical equipment in steam generators of captive power plant at HWP, Manuguru (Paper No. 5.3)

    International Nuclear Information System (INIS)

    Bhatnagar, R.; Sinha, Ashok; Mohan Rao, A.C.

    1992-01-01

    Heavy Water Project (Manuguru) is having a captive power plant to cater to the demands of steam and power for the main plant. During the commissioning and initial run of the steam generators and their auxiliaries, teething/initial problems were encountered in nearly all the equipment of the steam generators. This paper briefly describes some of the major problems faced during the commissioning of the steam generators. (author). 4 figs

  17. Design and field operation of 1175 MW steam turbine for Ohi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hirota, Yoshio; Nakagami, Yasuo; Fujii, Hisashi; Shibanai, Hirooki.

    1980-01-01

    Two 1175 MW steam turbine and generator units have been successfully in commercial operation since March 1979 and December 1979 respectively at Ohi Nuclear Power Station of the Kansai Electric Power Company. Those units, the largest in their respective outputs in Japan, have also such remarkable design features as two-stage reheat, nozzle governing turbine, water cooled generator stator and turbine-driven feedwater pumps. This paper covers design features and some topics of various pre-operational tests of the above-mentioned units. (author)

  18. Design and field operation of 1175 MW steam turbine for Ohi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hirota, Y.; Nakagami, Y.; Fujii, H.; Shibanai, H.

    1980-01-01

    Two 1,175 MW steam turbine and generator units have been successfully in commercial operation since March 1979 and December 1979 respectively at Ohi Nuclear Power Station of the Kansai Electric Power Company. Those units, the largest in their respective outputs in Japan, have also such remarkable design features as two-stage reheat, nozzle governing turbine, water cooled generator stator and turbine-driven feedwater pumps. This paper covers design features and some topics of various pre-operational tests of the above-mentioned units. (author)

  19. The Japanese and Italian power station markets: prospects for steam coal

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, S D

    1989-02-01

    The world market for steam coal seems likely to fall far short of the expectations of 1980. Two markets which appeared to offer considerable scope for expansion, the Italian and Japanese power station markets, are examined and the factors behind their disappointing performance analysed. The reasons behind the lack of investments in new power stations differ. Difficulties in obtaining sites and financial problems are most important in Italy, whilst environmental restrictions and the attractions of competing technologies dominate in Japan. It is concluded that these factors will not weaken significantly in the next decade and coal's prospects in these two markets are correspondingly restricted. 20 refs., 20 tabs.

  20. Duke Power Company - McGuire Nuclear Station: steam-generator hideout return and cleanup

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    McGuire Nuclear Station steam generator hideout return and cleanup are discussed. Hideout return data are presented for Unit 1 shutdowns that occurred on November 23, 1984, and April 19, 1985, and a Unit 2 shutdown on January 25, 1985. The data are presented as the concentrations of various species as a function of time after power reduction and primary water temperature. The steam generator blowdown as a function of time after power reduction is also presented. The concentrations of sodium, potassium, calcium, magnesium, aluminum, iron, and copper cations, and chloride, fluoride, sulfate, phosphate and nitrite anions were monitored during the each shutdown. Silica was also measured in the two 1985 shutdowns. The return of sulfate, phosphate, calcium and magnesium showed retrograde solubility. Silica concentrations showed an increase as the temperature decreased to about 450 to 500 0 F and then they decreased as the temperature decreased. McGuire has a holf point at 300 at 350 0 F to clean up the steam generator secondary water. The return of sulfates should occur within 4 to 6 hours. The blowdown is maximized to reduce the secondary water impurity concentrations. Cleanup continues until the sulfate concentration is reduced to below 100 ppb. At that point cooldown is continued

  1. Improvement of chemical control in the water-steam cycle of thermal power plants

    International Nuclear Information System (INIS)

    Rajakovic-Ognjanovic, Vladana N.; Zivojinovic, Dragana Z.; Grgur, Branimir N.; Rajakovic, Ljubinka V.

    2011-01-01

    A more effective chemical control in the water-steam cycle (WSC) of thermal power plants (TPP) is proposed in this paper. Minimization of corrosion effects by the production of ultra pure water and its strict control is the basis of all the investigated processes. The research involved the analysis of water samples in the WSC through key water quality parameters and by the most convenient analytical tools. The necessity for the stricter chemical control is demonstrated through a concrete example of the TPP Nikola Tesla, Serbia. After a thorough analysis of the chemical control system of the WSC, diagnostic and control parameters were chosen for continuous systematic measurements. Sodium and chloride ions were recognized as the ions which indicate the corrosion potential of the water and give insight into the proper production and maintenance of water within the WSC. Chemical transformations of crucial corrosion elements, iron and silica, were considered and related to their quantitative values. - Research highlights: → The more effective chemical control in the water-steam cycle of thermal power plant Nikola Tesla, Serbia. → In chemical control the diagnostic and control parameters were optimized and introduced for the systematic measurements in the water-steam cycle. → Sodium and chloride ions were recognized as ions which indicate corrosion potential of water and give insight to proper function of production and maintenance of water within water-team cycle. → Chemical transformations of crucial corrosion elements, iron and silica are considered and related with their quantitative values.

  2. Stress corrosion cracking of steam generator tube and primary pipe in PWR type nuclear power plants

    International Nuclear Information System (INIS)

    Zhang Weiguo; Gao Fengqin; Zhou Hongyi

    1993-01-01

    The behavior of stress corrosion cracking (SCC) is studied by slow strain rate test (SSRT), constant load test (CLT) and low frequency cyclic loading test (LFCLT). The purpose of these tests is to get the test data for evaluating the integrity of pressurized boundary of pipes in Qinshan and Guangdong nuclear power plants. Tested materials are 316 nuclear grade stainless steel (SS) for primary pipes in welded heat affected zone (WHAZ) and steam generator tubes, such as Incoloy-800, Inconel-600, Inconel-690 and 321 SS which are used for steam generator in PWR. The effects of material metallurgy, shot-peening treatment, tensile load, strain rate, cyclic load and water chemistry on the behavior of SCC are investigated

  3. Computer code to simulate transients in a steam generator of PWR nuclear power plants

    International Nuclear Information System (INIS)

    Silva, J.M. da.

    1979-01-01

    A digital computer code KIBE was developed to simulate the transient behavior of a Steam Generator used in Pressurized Water Reactor Power PLants. The equations of Conservation of mass, energy and momentum were numerically integrated by an implicit method progressively in the several axial sections into which the Steam Generator was divided. Forced convection heat transfer was assumed on the primary side, while on the secondary side all the different modes of heat transfer were permitted and deternined from the various correlations. The stability of the stationary state was verified by its reproducibility during the integration of the conservation equation without any pertubation. Transient behavior resulting from pertubations in the flow and the internal energy (temperature) at the inlet of the primary side were simulated. The results obtained exhibited satisfactory behaviour. (author) [pt

  4. Utilization of agricultural waste in power production

    Energy Technology Data Exchange (ETDEWEB)

    Clausen, J.C. [ELSAMPROJEKT A/S, Fredericia (Denmark); Rasmussen, I. [MIDTKRAFT Power Co., Aarhus (Denmark)

    1993-12-31

    It is a goal of the Danish energy policy for the last decade to reduce energy consumption and to introduce fuels for power production with less CO{sub 2} emission than coal. This measure has caused a considerable effort by the Danish utilities to develop technologies that reduce CO{sub 2} emissions without causing heavy cost increases of power. Agricultural waste in the form of surplus straw is available in an amount equivalent to 20% of the annual coal imports to Denmark. Straw firing is difficult due to its significant contents of alkaline components. Consequently, its utilization presupposes the development of new technologies. The biomass development program is concentrated on two ways which are (1) co-firing of existing coal fired power station with a modest amount of straw and (2) development of CFB technology that allows a high share of biomass as well as coal only. These options were tested in a coal fired 70 MW spreader stoker unit and a 125 MW PF unit. Approx. 4000 t of straw were burned. Additional tests will be launched this autumn, burning 35,000 t of straw at rates up to 20% straw. The CFB option is pursued from the platform of a 80 MWth unit, operational early `92. This plant burns a mix of 50% straw and 50% coal and consumes annually 70.000 t of straw. Future development is aiming towards CFBs of 250 MW(e), burning in excess of 50% biomass.

  5. Combined heat and power considered as a virtual steam cycle heat pump

    International Nuclear Information System (INIS)

    Lowe, Robert

    2011-01-01

    The first aim of this paper is to shed light on the thermodynamic reasons for the practical pursuit of low temperature operation by engineers involved in the design and the operation of combined heat and power (CHP) and district heating (DH) systems. The paper shows that the steam cycle of a combined heat and power generator is thermodynamically equivalent to a conventional steam cycle generator plus an additional virtual steam cycle heat pump. This apparently novel conceptualisation leads directly to (i) the observed sensitivity of coefficient of performance of CHP to supply and return temperatures in associated DH systems, and (ii) the conclusion that the performance of CHP will tend to be significantly higher than real heat pumps operating at similar temperatures. The second aim, which is pursued more qualitatively, is to show that the thermodynamic performance advantages of CHP are consistent with the goal of deep, long-term decarbonisation of industrialised economies. As an example, estimates are presented, which suggest that CHP based on combined-cycle gas turbines with carbon capture and storage has the potential to reduce the carbon intensity of delivered heat by a factor of ∼30, compared with a base case of natural gas-fired condensing boilers. - Highlights: → Large-scale CHP systems are thermodynamically equivalent to virtual steam cycle heat pumps. → COPs of such virtual heat pumps are necessarily better than the Carnot limit for real heat pumps. → COPs can approach 9 for plant matched to district heating systems with flow temperatures of 90 deg. C. → CHP combined with CCGT and CCS can reduce the carbon intensity of delivered heat ∼30-fold.

  6. Performance analysis of an integrated gas-, steam- and organic fluid-cycle thermal power plant

    International Nuclear Information System (INIS)

    Oko, C.O.C.; Njoku, I.H.

    2017-01-01

    This paper presents the performance analysis of an existing combined cycle power plant augmented with a waste heat fired organic Rankine cycle power plant for extra power generation. This was achieved by performing energy and exergy analysis of the integrated gas-, steam- and organic fluid-cycle thermal power plant (IPP). Heat source for the subcritical organic Rankine cycle (ORC) was the exhaust flue gases from the heat recovery steam generators of a 650 MW natural gas fired combined cycle power plant. The results showed that extra 12.4 MW of electricity was generated from the attached ORC unit using HFE7100 as working fluid. To select ORC working fluid, ten isentropic fluids were screened and HFE7100 produced the highest net power output and cycle efficiency. Exergy and energy efficiencies of the IPP improved by 1.95% and 1.93%, respectively. The rate of exergy destruction in the existing combined cycle plant was highest in the combustion chamber, 59%, whereas in the ORC, the highest rate of exergy destruction occurred in the evaporator, 62%. Simulations showed exergy efficiency of the IPP decreased with increasing ambient temperature. Exit stack flue gas temperature reduced from 126 °C in the combined cycle power plant to 100 °C in the integrated power plant. - Highlights: • Combined cycle plant retrofitted with ORC produced extra 12.4 MW electric power. • ORC is powered with low temperature flue gas from an existing combined cycle plant. • Exergy destruction rate in integrated plant(IPP) is less than in combined plant. • Exit stack temperature of the IPP has less environmental thermal pollution. • Exergy and energy efficiencies of the IPP improved by 1.95% and 1.93%, respectively.

  7. Utility challenges in a competitive power industry

    International Nuclear Information System (INIS)

    Roberts, J.

    2001-01-01

    Allete, formerly Minnesota Power, is no longer an electric utility, but a broadly-diversified company operating in 39 states and 8 Canadian provinces. Allete provides retail services in their water and energy business. In addition, they provide wholesale services in their automotive service business, they sell land to developers and have entered into the telecommunications and paper making industry. Diversification has been successful for Allete, and has resulted in a strong balance sheet and cash flow. Graphs depicting the company's business earnings, assets and growth rates were included in this power point presentation. Allete plans to triple its size and continue to maintain its annual growth of 10 per cent or better. tabs., figs

  8. Proceedings of the CNRA/CSNI workshop on steam generator tube integrity in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Diercks, D.R. [Argonne National Lab., IL (United States)

    1997-02-01

    The objective of the workshop was to provide a working forum for the exchange of information by contributing experts on current issues related to PWR steam generator tube integrity. One hundred persons from 15 countries attended the workshop, including 36 from regulatory and nuclear policy agencies, 28 from research and development laboratories, 18 from nuclear vendors and consulting firms, and 18 from electrical utilities. The workshop opened with a plenary session; the first part of the session covered international steam generator regulatory practices and issues, featuring speakers from regulatory bodies in Belgium, France, Japan, Spain, and the US. In Part 2 of the plenary session, comprehensive technical overviews on steam generator tubing degradation, inspection, and integrity were presented by authorities in these fields from the US, France, and Belgium. Parallel working sessions on the second and third days of the workshop then developed findings and recommendations in the areas of (1) tubing degradation, (2) tubing inspection, (3) tubing integrity, (4) preventative and corrective measures, and (5) operational aspects and risk analysis. On the final day of the workshop, the working-session facilitators presented summaries of their sessions to the workshop attendees. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  9. Proceedings of the CNRA/CSNI workshop on steam generator tube integrity in nuclear power plants

    International Nuclear Information System (INIS)

    Diercks, D.R.

    1997-02-01

    The objective of the workshop was to provide a working forum for the exchange of information by contributing experts on current issues related to PWR steam generator tube integrity. One hundred persons from 15 countries attended the workshop, including 36 from regulatory and nuclear policy agencies, 28 from research and development laboratories, 18 from nuclear vendors and consulting firms, and 18 from electrical utilities. The workshop opened with a plenary session; the first part of the session covered international steam generator regulatory practices and issues, featuring speakers from regulatory bodies in Belgium, France, Japan, Spain, and the US. In Part 2 of the plenary session, comprehensive technical overviews on steam generator tubing degradation, inspection, and integrity were presented by authorities in these fields from the US, France, and Belgium. Parallel working sessions on the second and third days of the workshop then developed findings and recommendations in the areas of (1) tubing degradation, (2) tubing inspection, (3) tubing integrity, (4) preventative and corrective measures, and (5) operational aspects and risk analysis. On the final day of the workshop, the working-session facilitators presented summaries of their sessions to the workshop attendees. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database

  10. Design of a H∞ Robust Controller with μ-Analysis for Steam Turbine Power Generation Applications

    Directory of Open Access Journals (Sweden)

    Vincenzo Iannino

    2017-07-01

    Full Text Available Concentrated Solar Power plants are complex systems subjected to quite sensitive variations of the steam production profile and external disturbances, thus advanced control techniques that ensure system stability and suitable performance criteria are required. In this work, a multi-objective H∞ robust controller is designed and applied to the power control of a Concentered Solar Power plant composed by two turbines, a gear and a generator. In order to provide robust performance and stability in presence of disturbances, not modeled plant dynamics and plant-parameter variations, the advanced features of the μ-analysis are exploited. A high order controller is obtained from the process of synthesis that makes the implementation of the controller difficult and computational more demanding for a Programmable Logic Controller. Therefore, the controller order is reduced through the Balanced Truncation method and then discretized. The obtained robust control is compared to the current Proportional Integral Derivative-based governing system in order to evaluate its performance, considering unperturbed as well as perturbed scenarios, taking into account variations of steam conditions, sensor measurement delays and power losses. The simulations results show that the proposed controller achieves better robustness and performance compared to the existing Proportional Integral Derivative controller.

  11. Multi-region fuzzy logic controller with local PID controllers for U-tube steam generator in nuclear power plant

    Directory of Open Access Journals (Sweden)

    Puchalski Bartosz

    2015-12-01

    Full Text Available In the paper, analysis of multi-region fuzzy logic controller with local PID controllers for steam generator of pressurized water reactor (PWR working in wide range of thermal power changes is presented. The U-tube steam generator has a nonlinear dynamics depending on thermal power transferred from coolant of the primary loop of the PWR plant. Control of water level in the steam generator conducted by a traditional PID controller which is designed for nominal power level of the nuclear reactor operates insufficiently well in wide range of operational conditions, especially at the low thermal power level. Thus the steam generator is often controlled manually by operators. Incorrect water level in the steam generator may lead to accidental shutdown of the nuclear reactor and consequently financial losses. In the paper a comparison of proposed multi region fuzzy logic controller and traditional PID controllers designed only for nominal condition is presented. The gains of the local PID controllers have been derived by solving appropriate optimization tasks with the cost function in a form of integrated squared error (ISE criterion. In both cases, a model of steam generator which is readily available in literature was used for control algorithms synthesis purposes. The proposed multi-region fuzzy logic controller and traditional PID controller were subjected to broad-based simulation tests in rapid prototyping software - Matlab/Simulink. These tests proved the advantage of multi-region fuzzy logic controller with local PID controllers over its traditional counterpart.

  12. Manufacture of steam generator units and components for the AGR power stations at Heysham II and Torness

    Energy Technology Data Exchange (ETDEWEB)

    Glasgow, J R; Parkin, K [N.E.I. Nuclear Systems Ltd., Gateshead, Tyne and Wear (United Kingdom)

    1984-07-01

    The current AGR Steam Generator is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley B/Hunterston B AGR power stations. In this paper a brief outline of the evolution of the steam generator design from the earlier gas cooled reactor stations is presented. A description of the main items of fabrication development is given. The production facilities for the manufacture of the units are described. Reference is also made to some of the work on associated components. The early experience on the construction site of installation of the steam generators is briefly outlined. (author)

  13. Manufacture of steam generator units and components for the AGR power stations at Heysham II and Torness

    International Nuclear Information System (INIS)

    Glasgow, J.R.; Parkin, K.

    1984-01-01

    The current AGR Steam Generator is a development of the successful once-through units supplied for the Oldbury Magnox and Hinkley B/Hunterston B AGR power stations. In this paper a brief outline of the evolution of the steam generator design from the earlier gas cooled reactor stations is presented. A description of the main items of fabrication development is given. The production facilities for the manufacture of the units are described. Reference is also made to some of the work on associated components. The early experience on the construction site of installation of the steam generators is briefly outlined. (author)

  14. Advanced numerical description of the behavior of 700 C steam power plant components

    Energy Technology Data Exchange (ETDEWEB)

    Maile, K. [Materialpruefungsanstalt, Univ. Stuttgart (Germany); Schmidt, K.; Roos, E.; Klenk, A.; Speicher, M.

    2009-07-01

    To make full use of the strength potential of new boiler materials like the new 9-11% Cr steels and nickel based alloys, taking into account their specific stress-strain relaxation behavior, new design methods are required in the design of today's power plants. Highly loaded components are approaching more and more the classical design limits with regard to critical wall thicknesses and the related tolerable thermal gradients, due to planed increases of steam parameters like steam pressure and steam temperature. ''Design by analysis'' can be realized by modern state of the art Numerical Finite Element (FE) simulation codes and in some cases by the use of user defined advanced inelastic material laws. These material laws have to be adjusted to specific material behavior of new boiler materials. To model the strain and stress situation in components under high temperature loading, a constitutive equation based on a Graham-Walles approach is used in this paper. Furthermore essential steps and recommendations to implement experimental data in the user defined subroutines and the subsequent integration of the subroutines in modern FE codes like ABAQUS trademark and ANSYS trademark are given. As an example, the results of FE simulations of components like hollow cylinders and waterwall like components made of Alloy 617 or 9-11% Cr steels are discussed and verified with experimental results. In a last step, the successful application of the developed creep equation will be demonstrated by calculating the creep strains and stress relaxation of a P92 steam header under constant loading. (orig.)

  15. Telecommunications: international opportunities for power utilities

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, A. [Teleglobe Canada, Ottawa, ON (Canada)

    1996-08-01

    International telecommunications services markets and trends were reviewed in an effort to identify business opportunities for Canadian power utilities. With increasing deregulation in the U.S. and Canada, and other countries around the globe, market opportunities are beginning to open up. In monopoly markets opportunities exist in providing dual infrastructures to upgrade both the power delivery services (frequently poor), and telecommunications. Billing, collection and customer service expertise might be other marketable commodities, perhaps packaged as part of a network provision project as a service to existing power and telecommunications service providers. In countries with directed competition markets local partnerships may be the only vehicle for entering the market. In managed competition markets opportunities were said to exist in cellular radio technology, as well as in switched telephone service, local, long distance, or international. In general, opportunities outside telecommunications-rich North America were considered to have better potential, due to rapid deregulation and higher current growth rates in telecommunications. Careful examination and research of the political and business environment prior to entering any of the potentially fertile areas was advised.

  16. Possibilities of utilizing power plant fly ashes

    Directory of Open Access Journals (Sweden)

    Mezencevová Andrea

    2003-09-01

    Full Text Available The burning of fossil fuels in industrial power stations plays a significant role in the production of thermal and electrical energy. Modern thermal power plants are producing large amounts of solid waste, mainly fly ashes. The disposal of power plant waste is a large environmental problem at the present time. In this paper, possibilities of utilization of power plant fly ashes in industry, especially in civil engineering, are presented. The fly ash is a heterogeneous material with various physical, chemical and mineralogical properties, depending on the mineralogical composition of burned coal and on the used combustion technology. The utilization of fly ashes is determined of their properties. The fineness, specific surface area, particle shape, density, hardness, freeze-thaw resistance, etc. are decisive. The building trade is a branch of industry, which employs fly ash in large quantities for several decades.The best utilization of fluid fly ashes is mainly in the production of cement and concrete, due to the excellent pozzolanic and cementitious properties of this waste. In the concrete processing, the fly ash is utilized as a replacement of the fine aggregate (fine filler or a partial replacement for cement (active admixture. In addition to economic and ecological benefits, the use of fly ash in concrete improves its workability and durability, increases compressive and flexural strength, reduces segregation, bleeding, shrinkage, heat evolution and permeability and enhances sulfate resistance of concrete.The aim of current research is to search for new technologies for the fly ash utilization. The very interesting are biotechnological methods to recovery useful components of fly ashes and unconventional methods of modification of fly ash properties such as hydrothermal zeolitization and mechanochemical modification of its properties. Mechanochemistry deals with physico - chemical transformations and chemical reactions of solids induced by

  17. Steam generator tube performance: experience with water-cooled nuclear power reactors during 1978

    International Nuclear Information System (INIS)

    Tatone, O.S.; Pathania, R.S.

    1980-02-01

    The performance of steam generator tubes in water-cooled nuclear power reactors has been reviewed for 1978. Tube failures occurred at 31 of the 86 reactors surveyed. Causes of these failures and procedures designed to deal with them are described. A dramatic decrease in the number of tubes plugged was evident in 1978 compared to the previous year. This is attributed to diligent application of techniques developed from in-plant experience and research and development programs over the past several years. (auth)

  18. Eddy-current tests on operational evaluation of steam generator tubes in nuclear power plants

    International Nuclear Information System (INIS)

    Lopez, Luiz Antonio Negro Martin; Ting, Daniel Kao Sun

    2000-01-01

    This paper presents a worldwide research on the technical and economical impacts due to failure in tube bundles of nuclear power plant steam generators. An Eddy current non destructive test using Foucault currents for the inspection and failure detection on the tubes, and also the main type of defects. The paper also presents the signals generated by a Zetec MIZ-40 test equipment. This paper also presents a brief description of an automatic system for data analysis which is under development by using a fuzzy logic and artificial intelligence

  19. Thermohidraulic model for a typical steam generator of PWR Nuclear Power Plants

    International Nuclear Information System (INIS)

    Braga, C.V.M.

    1980-06-01

    A model of thermohidraulic simulation, for steady state, considering the secondary flow divided in two parts individually homogeneous, and with heat and mass transferences between them is developed. The quality of the two-phase mixture that is fed to the turbine is fixed and, based on this value, the feedwater pressure is determined. The recirculation ratio is intrinsically determined. Based on this model it was developed the GEVAP code, in Fortran-IV language. The model is applied to the steam generator of the Angra II nuclear power plant and the results are compared with KWU'S design parameters, being considered satisfactory. (Author) [pt

  20. Nuclear power plant steam pipes repairing with TIRANT 3 robot system

    International Nuclear Information System (INIS)

    Soto Tomas, Marcelo; Curiel Nieva, Marceliano; Monzo Blasco, Enrique; Rodriguez, Salvador Pineda; Vaquer Perez, Juan I.

    2011-01-01

    A typical application functions covering the steam pipes inner surface in coal-fired power station and nuclear power plants. The results of this process are spectacular in terms of protection against corrosion and abrasion, but its application has conditioning factors, such as: Severe application conditions for workers. Due to the postural position (usually kneeling) in small diameter pipes and working with fireproof clothing and masks with outdoor air supplying, due to fumes, sparks and molten metal particles, radiological contamination, confined space, poor lighting... Coating uniformity. As metallization is a manual process, the carried out measurements show small variations in the thickness of the coating, always within the tolerance limits established by the applicable regulations and quality assurance. For all these reasons, Grupo Dominguis has developed the TIRANT 3 robot, a worldwide innovative system, for metallization of steam pipes inner surface. TIRANT 3 robot is teleoperated from outside of the pipe, so that human intervention is reduced to the operations of robot positioning and change of metallization wire. As it is an independent system of the human factor, metallization process performance is significantly increased by reducing rest periods due only to the robot maintenance. Likewise, TIRANT 3 system permits to increase resulting coating uniformity, and thus its resistance, keeping selected parameters constant depending on required type and thickness of wire. TIRANT 3 system has successfully worked in 2010 during the stops refueling of the Units I and II of Laguna Verde nuclear power plant in Mexico. (author)

  1. LCA-LCCA of oil fired steam turbine power plant in Singapore

    International Nuclear Information System (INIS)

    Kannan, R.; Tso, C.P.; Osman, Ramli; Ho, H.K.

    2004-01-01

    A life cycle assessment (LCA) was conducted to quantify the non-renewable energy use and global warming potential in electricity generation from a typical oil fired steam turbine plant in Singapore. As the conventional LCA does not include any cost analysis, which is a major criterion in decision making, the cost of power generation is estimated using a life cycle cost analysis (LCCA) tool. It is estimated that the hidden processes consumed about 9% additional energy on top of the fuel embedded energy, while the hidden GHG emission is about 12%. A correlation is established to estimate the life cycle energy use and GHG emissions directly from the power plant net efficiency. The study methodology, results and the empirical relations are presented, together with a brief overview of the Singapore power sector. It also highlights the need for consideration of the reserves availability in the pricing mechanism and how such cost indices could be developed based on the LCA-LCCA

  2. LCA-LCCA of oil fired steam turbine power plant in Singapore

    International Nuclear Information System (INIS)

    Kannan, R.; Tso, C.P.; Osman, Ramli; Ho, H.K.

    2004-01-01

    A life cycle assessment (LCA) was conducted to quantify the non-renewable energy use and global warming potential in electricity generation from a typical oil fired steam turbine plant in Singapore. As the conventional LCA does not include any cost analysis, which is a major criterion in decision making, the cost of power generation is estimated using a life cycle cost analysis (LCCA) tool. It is estimated that the hidden processes consumed about 9% additional energy on top of the fuel embedded energy, while the hidden GHG emission is about 12%. A correlation is established to estimate the life cycle energy use and GHG emissions directly from the power plant net efficiency. The study methodology, results and the empirical relations are presented, together with a brief overview of the Singapore power sector. It also highlights the need for consideration of the reserves availability in the pricing mechanism and how such cost indices could be developed based on the LCA-LCCA. (Author)

  3. Analysis methodology for the post-trip return to power steam line break event

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chul Shin; Kim, Chul Woo; You, Hyung Keun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-06-01

    An analysis for Steam Line Break (SLB) events which result in a Return-to-Power (RTP) condition after reactor trip was performed for a postulated Yonggwang Nuclear Power Plant Unit 3 cycle 8. Analysis methodology for post-trip RTP SLB is quite different from that of non-RTP SLB and is more difficult. Therefore, it is necessary to develop a methodology to analyze the response of the NSSS parameters to the post-trip RTP SLB events and the fuel performance after the total reactivity exceeds the criticality. In this analysis, the cases with and without offsite power were simulated crediting 3-D reactivity feedback effect due to a local heatup in the vicinity of stuck CEA and compared with the cases without 3-D reactivity feedback with respect to post-trip fuel performance. Departure-to Nucleate Boiling Ratio (DNBR) and Linear Heat Generation Rate (LHGR). 36 tabs., 32 figs., 11 refs. (Author) .new.

  4. Thermal power sludge – properties, treatment, utilization

    Directory of Open Access Journals (Sweden)

    Martin Sisol

    2005-11-01

    Full Text Available In this paper a knowledge about properties of thermal power sludge from coal combustion in smelting boilers is presented. The physical and technological properties of slag – granularity, density, specific, volume and pouring weight, hardness and decoupling – together with chemical properties influence its exploitation. The possibility of concentrating the Fe component by the mineral processing technologies (wet low-intenzity magnetic separation is verified. An industrial use of the slag in civil engineering, e.g. road construction, was realised. The slag-fly ashes are directly utilized in the cement production as a substitute of a part of natural raw materials. For the use of slag as the stoneware in the road construction, all the criteria are fulfilled.

  5. Integrating life cycle assessment and emergy synthesis for the evaluation of a dry steam geothermal power plant in Italy

    International Nuclear Information System (INIS)

    Buonocore, Elvira; Vanoli, Laura; Carotenuto, Alberto; Ulgiati, Sergio

    2015-01-01

    Greenhouse gas emissions, climate change and the rising energy demand are currently seen as most crucial environmental concerns. With the exploration of renewable energy sources to meet the challenges of energy security and climate change, geothermal energy is expected to play an important role. In this study a LCA (Life Cycle Assessment) and an EMA (Emergy Assessment) of a 20 MW dry steam geothermal power plant located in the Tuscany Region (Italy) are performed and discussed. The plant is able to produce electricity by utilizing locally available renewable resources together with a moderate support by non-renewable resources. This makes the geothermal source eligible to produce renewable electricity. However, the direct utilization of the geothermal fluid generates the release into the atmosphere of carbon dioxide, hydrogen sulfide, mercury, arsenic and other chemicals that highly contribute to climate change, acidification potential, eutrophication potential, human toxicity and photochemical oxidation. The study aims to understand to what extent the geothermal power plant is environmentally sound, in spite of claims by local populations, and if there are steps and/or components that require further attention. The application of the Emergy Synthesis method provides a complementary perspective to LCA, by highlighting the direct and indirect contribution in terms of natural capital and ecosystem services to the power plant construction and operation. The environmental impacts of the geothermal power plant are also compared to those of renewable and fossil-based power plants. The release of CO 2 -eq calculated for the investigated geothermal plant (248 g kWh −1 ) is lower than fossil fuel based power plants but still higher than renewable technologies like solar photovoltaic and hydropower plant. Moreover, the SO 2- eq release associated to the geothermal power plant (3.37 g kWh −1 ) is comparable with fossil fuel based power plants. Results suggest the

  6. Energy Conservation Alternatives Study (ECAS): Conceptual Design and Implementation Assessment of a Utility Steam Plant with Conventional Furnace and Wet Lime Stack Gas Scrubbers

    Science.gov (United States)

    Brown, Dale H.

    1976-01-01

    A study was performed to estimate the technical/economic characteristics of a steam power plant (3500 pounds per square inch gauge, 1000 degrees Fahrenheit / 1000 degrees Fahrenheit) with a coal-burning radiant furnace and a wet lime stack gas scrubber to control sulfur emissions. Particulate emissions were controlled by an electrostatic precipitator operating at 300 degrees Fahrenheit. The stack gas from the scrubber was reheated from 125 degrees Fahrenheit to 250 degrees Fahrenheit as a base case, and from 125 degrees Fahrenheit to 175 degrees Fahrenheit as an alternate case. The study was performed on a basis consistent with the General Electric ECAS Phase II evaluation of advanced energy conversion systems for electric utility baseload applications using coal or coal-derived fuels. A conceptual design of the power plant was developed, including the on-site calcination of limestone to lime and the provision of sludge ponds to store the products of flue gas scrubbing. From this design, estimates were derived for power plant efficiency, capital cost, environmental intrusion characteristics, natural resource requirements, and cost of electricity at an assumed capacity factor of 65 percent. An implementation assessment was performed where factors affecting applicability of the conceptual design power plant in electric utility generation systems were appraised. At 250 degrees Fahrenheit and 175 degrees Fahrenheit stack gas temperatures respectively, the plants showed a cost of electricity of 39.8 and 37.0 mills per kilowatt-hours and overall plant efficiencies of 32 percent and 34 percent.

  7. A municipal utility seeks IPP power

    International Nuclear Information System (INIS)

    Whitney, D.D.

    1990-01-01

    The Sacramento Municipal Utility District (SMUD), primarily located in Sacramento County, one of the ten highest growth areas in the U.S. today, serves a 900 square mile area with over 450,000 customers and has seen peak loads of about 2200 MW. In June of 1989, the customer-owners of SMUD, voted to shutdown the 913 MW Rancho Seco Nuclear Generating Station which constituted nearly one-half of the district's power resources. The need to immediately replace the lost capacity was somewhat tempered as a consequence of previously signed contracts with the Pacific Gas and Electric Company (PG and E) for 550 MW and with the Southern California Edison Company (SCE) for 300 MW. Both contracts provide power for only ten years, ending in 1999, and while being competitively priced in the early years, include significant escalation in capacity charges beginning in 1995, and always price energy at local natural gas market prices while including other arduous conditions. When combined with their hydroelectric and other resources these contracts allow SMUD to remain competitive. However, there remains the incentive, and ultimately necessity, of replacing the contracts with alternative resources. This paper describes an aggressive program to obtain replacement resources which will diversify SMUD's resource mix and protect their customer-owners from the uncertainties of the future while retaining the benefits of tax exempt financing and being their own stockholders

  8. Development of processes for the utilization of Brazilian coal using nuclear process heat and/or nuclear process steam

    International Nuclear Information System (INIS)

    Bamert, H.; Niessen, H.F.; Walbeck, M.; Wasrzik, U.; Mueller, R.; Schiffers, U.; Strauss, W.

    1980-01-01

    Status of the project: End of the project definition phase and preparation of the planned conceptual phase. Objective of the project: Development of processes for the utilization of nuclear process heat and/or nuclear process steam for the gasification of coal with high ash content, in particular coal from Brazil. Results: With the data of Brazilian coal of high ash content (mine Leao/ 43% ash in the mine-mouth quality, 20% ash after preparation) there have been worked out proposals for the mine planning and for a number of processes. On the basis of these proposals and under consideration of the main data specified by the Brazilian working group there have been choosen two processes and worked out in a conceptual design: 1) pressurized water reactor + LURGI-pressure gasifier/hydrogasification for the production of SNG and 2) high temperature reactor steam gasification for the production of town gas. The economic evaluation showed that the two processes are not substantially different in their cost efficiency and they are economical on a long-term basis. For more specific design work there has been planned the implementation of an experimental programme using the semi-technical plants 'hydrogasification' in Wesseling and 'steam gasification' in Essen as the conceptual phase. (orig.) [de

  9. Optimisation of a Kalina cycle for a central receiver solar thermal power plant with direct steam generation

    DEFF Research Database (Denmark)

    Modi, Anish; Haglind, Fredrik

    2014-01-01

    Central receiver solar thermal power plants are regarded as one of the promising ways to generate electricity in near future. They offer the possibility of using high temperatures and pressures to achieve high efficiencies with standard power cycles. A direct steam generation approach can be used...

  10. 76 FR 66333 - Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Science.gov (United States)

    2011-10-26

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2011-0247] Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental Assessment and Finding of No Significant... Facility Operating License No. DPR-23, issued to Carolina Power & Light Company (the licensee), for...

  11. A process for superheating steam in a nuclear power station circuit and device for putting in operation this process

    International Nuclear Information System (INIS)

    Monteil, Marcel; Forestier, Jean; Leblanc, Bernard; Monteil, Pierre

    1975-01-01

    A process is described for superheating steam in a nuclear power station circuit, comprising a turbine with a high pressure chamber and a low pressure chamber. It consists in superheating the steam between the high and low pressure chambers of the turbine by using as heating fluid water under pressure at vaporisation temperature, directly taken from the recirculation or circulation flow water of the reactor or of the steam generators. The process is adapted to a pressurised water reactor using a once-through steam generator comprising in succession an economiser, a vaporiser and a superheater, the superheating water being taken at the vaporiser intake. It is also adapted for a boiling water reactor, in that the water is taken directly from the reactor vessel and at a suitable level in the recirculation water [fr

  12. Adjustable control in the steam zone of a steam power plant; Control ajustable de la zona de vapor de una unidad termoelectrica

    Energy Technology Data Exchange (ETDEWEB)

    Alvarez Gallegos, Joaquin; Bourguet Diaz, Rafael Ernesto [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1990-12-31

    A general description is presented of self adjustable control systems, as well as of the design and its application for steam temperature regulation of a steam power plant unit model. The algorithm employed is a controller of minimum variance that ponders the output deviation as well as the control effort. The results are compared with the ones obtained in a conventional control scheme, showing in general a better performance in the conducted experiments. [Espanol] Se presenta una descripcion general de los sistemas de control autoajustable, asi como del diseno y su aplicacion para regular las temperaturas de vapor de un modelo de unidad termoelectrica. El algoritmo utilizado es un controlador de variancia minima que pondera tanto la desviacion de salida como el esfuerzo de control. Los resultados se comparan con los obtenidos en un esquema de control convencional, mostrando en general un mejor desempeno en los experimentos realizados.

  13. Device for achieving pressure balance in the steam generator of a power plant in case of a main-steam pipe or a feedwater pipe break

    International Nuclear Information System (INIS)

    Wietelmann, F.

    1978-01-01

    In order to increase the safety in the steam generator of a power plant in case of a pipe break, the possibility of a pressure balance between the feedwater inlet and the initial steam outlet chambers is allowed for. According to the invention, the partition wall separating these two chambers will exhibit several overflow openings, each of which will be provided with a closure and half of which may be opened to one side only, care having been taken that in case of an accident on occurrence of a certain differential pressure they will always be opened to the low-pressure side. As closures caps, which may be swing out of the way, or rupture diaphragms are mentioned. (UWI) 891 HP [de

  14. Energy Conversion Alternatives Study (ECAS), Westinghouse phase 1. Volume 11: Advanced steam systems. [energy conversion efficiency for electric power plants using steam

    Science.gov (United States)

    Wolfe, R. W.

    1976-01-01

    A parametric analysis was made of three types of advanced steam power plants that use coal in order to have a comparison of the cost of electricity produced by them a wide range of primary performance variables. Increasing the temperature and pressure of the steam above current industry levels resulted in increased energy costs because the cost of capital increased more than the fuel cost decreased. While the three plant types produced comparable energy cost levels, the pressurized fluidized bed boiler plant produced the lowest energy cost by the small margin of 0.69 mills/MJ (2.5 mills/kWh). It is recommended that this plant be designed in greater detail to determine its cost and performance more accurately than was possible in a broad parametric study and to ascertain problem areas which will require development effort. Also considered are pollution control measures such as scrubbers and separates for particulate emissions from stack gases.

  15. Adjustable control in the steam zone of a steam power plant; Control ajustable de la zona de vapor de una unidad termoelectrica

    Energy Technology Data Exchange (ETDEWEB)

    Alvarez Gallegos, Joaquin; Bourguet Diaz, Rafael Ernesto [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1991-12-31

    A general description is presented of self adjustable control systems, as well as of the design and its application for steam temperature regulation of a steam power plant unit model. The algorithm employed is a controller of minimum variance that ponders the output deviation as well as the control effort. The results are compared with the ones obtained in a conventional control scheme, showing in general a better performance in the conducted experiments. [Espanol] Se presenta una descripcion general de los sistemas de control autoajustable, asi como del diseno y su aplicacion para regular las temperaturas de vapor de un modelo de unidad termoelectrica. El algoritmo utilizado es un controlador de variancia minima que pondera tanto la desviacion de salida como el esfuerzo de control. Los resultados se comparan con los obtenidos en un esquema de control convencional, mostrando en general un mejor desempeno en los experimentos realizados.

  16. Study of the Utilization BWR Type Nuclear Power Reactor for Desalination Process

    International Nuclear Information System (INIS)

    Itjeu Karliana; Sumijanto; Dhandhang Purwadi, M.

    2008-01-01

    The needs of fresh water increased by rapid population growth and industrials expansion, but these demands can not be prepared naturally. Following this case, seawater desalination becomes the primer option which can fulfill the need through the nuclear desalination technology. The coupled nuclear power reactor enables to supply thermal energy for auxiliary equipment and pumps operation. The utilization study of power reactor type BWR coupled with desalination process has been performed. The goal of study is to obtain characteristic data of desalted water specification which desalination system coupling with nuclear power plant produced energy for desalination process. The study is carried out by browsing data and information, and comprehensive review of thermal energy correlation between NPP with desalination process installation. According to reviewing are found that the thermal energy and electric power utilization from the nuclear power reactor are enable to remove the seawater to produce desalted water and also to operate auxiliary equipments. The assessment results is VK-300 reactor prototype, BWR type 250 MW(e) power are cogeneration unit can supplied hot steam temperature 285 °C to the extraction turbine to empower 150 MW electric power, and a part of hot steam 130 °C is use to operate desalination process and remind heat is distribute to the municipal and offices at that region. The coupled of VK-300 reactor power type BWR with desalination installation of MED type enable to produce desalted water with high quality distillate. Based on the economic calculation that the VK-300 reactor power of BWR type produced water distillate capacity is 300.000 m 3 /hour with cost US$ 0.58/m 3 . The coupling VK-300 reactor power type BWR with MED desalination plant is competitive economically. (author)

  17. Combined heat and power plants with parallel tandem steam turbines; Smaaskalig kraftvaerme med parallellkopplade tandemturbiner

    Energy Technology Data Exchange (ETDEWEB)

    Steinwall, Pontus; Norstroem, Urban; Pettersson, Camilla; Oesterlin, Erik

    2004-12-01

    We investigate the technical and economical conditions for a concept with parallel coupled tandem turbines in small scale combined heat and power plants fired with bio-fuel and waste. Performance and heat production costs at varying electricity prices for the concept with two smaller tandem coupled steam turbines has been compared to the traditional concept with one single multi-staged turbine. Three different types of plants have been investigated: - Bio fuelled CHP plant with thermal capacity of 15 MW{sub th}; - Waste fired CHP plant with thermal capacity of 20 MW{sub th}; - Bio fuelled CHP plant with thermal capacity of 25 MW{sub th}. The simple steam turbines (Curtis turbines) used in the tandem arrangement has an isentropic efficiency of about 49 to 53% compared to the multi-staged steam turbines with isentropic efficiency in the range of 59% to 81%. The lower isentropic efficiency for the single staged turbines is to some extent compensated at partial load when one of the two turbines can be shut down leading to better operational conditions for the one still in operation. For concepts with saturated steam at partial load below 50% the tandem arrangements presents higher electricity efficiency than the conventional single turbine alternative. The difference in annual production of electricity is therefore less than the difference in isentropic efficiency for the two concepts. Production of electricity is between 2% and 42% lower for the tandem arrangements in this study. Investment costs for the turbine island has been calculated for the two turbine concepts and when the costs for turbines, generator, power transmission, condensing system, piping system, buildings, assembling, commissioning and engineering has been added the sum is about the same for the two concepts. For the bio-fuelled plant with thermal capacity of 15 MW{sub th} the turbine island amount to about 10-12 MSEK and about 13-15 MSEK for the waste fired plant with a thermal capacity of 20 MW

  18. Steam turbines of large output especially for nuclear power stations. Part 1

    International Nuclear Information System (INIS)

    Drahny, J.; Stasny, M.

    1986-01-01

    At the international conference, 53 papers were presented in 3 sessions dealing with the design of large output steam turbines, with problems of flow in steam turbines, and with the reliability and service life of steam turbines. Part 1 of the conference proceedings contains two introductory papers, one reviewing the 100 years history of steam turbines (not included in INIS), the other giving an overview of the development of steam turbines in the eighties; and the 13 papers heard in the session on steam turbine design, all inputted in INIS. (A.K.)

  19. Simulating the steam generator and the pressurizer of a PWR nuclear power plant

    International Nuclear Information System (INIS)

    De Greef, J.F.

    1985-01-01

    In a PWR nuclear power plant, considered as a power generating device, the steam generator as a subset plays an important role in the generation process, whereas the pressurizer rather acts as a control device for security purposes. Nevertheless, from a thermodynamical point of view, the two subsets behave basically in the same way, so that a common set of basic equations may be suggested to develop for each the proper mathematical simulation model. In this paper the generation of this common set of basic equations is described, from which a specific model for each device is derived. A numerical illustration of the behaviour of the two devices for typical inputs to the derived simulation model is pictured. (author)

  20. The United States Naval Nuclear Propulsion Program - Over 151 Million Miles Safely Steamed on Nuclear Power

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-03-01

    NNSA’s third mission pillar is supporting the U.S. Navy’s ability to protect and defend American interests across the globe. The Naval Reactors Program remains at the forefront of technological developments in naval nuclear propulsion and ensures a commanding edge in warfighting capabilities by advancing new technologies and improvements in naval reactor performance and reliability. In 2015, the Naval Nuclear Propulsion Program pioneered advances in nuclear reactor and warship design – such as increasing reactor lifetimes, improving submarine operational effectiveness, and reducing propulsion plant crewing. The Naval Reactors Program continued its record of operational excellence by providing the technical expertise required to resolve emergent issues in the Nation’s nuclear-powered fleet, enabling the Fleet to safely steam more than two million miles. Naval Reactors safely maintains, operates, and oversees the reactors on the Navy’s 82 nuclear-powered warships, constituting more than 45 percent of the Navy’s major combatants.

  1. Technical and economic assessment of power generation from municipal solid waste incineration on steam cycle

    Energy Technology Data Exchange (ETDEWEB)

    Romero Luna, Carlos Manuel; Carrocci, Luiz Roberto; Ferrufino, Gretta Larisa Aurora Arce; Balestieri, Jose Antonio Perrella [Dept. of Energy. UNESP, Sao Paulo State University, Guaratingueta, SP (Brazil)], e-mails: carrocci@feg.unesp.br, perrella@feg.unesp.br

    2010-07-01

    Nowadays, there is a concern in development of environmentally friendly methods for a municipal solid waste (MSW) management and demand for renewable energy sources. The source of waste is increasing, and the capacity and availability Landfill treatment and disposal are coming to be insufficient. In Sao Paulo City, the 10 million inhabitants produce 10,000 t of residential solid waste daily, being that 76% this quantity goes to landfill sites. In order to adopt a new treatment technology for MSW that will promote a solution minimizing this problem, within the order of priorities regarding waste management, the MSW incineration with energy recovery shown as the leading choice on the point of view of efficiency in converting energy. MSW incineration with energy recovery received wide acceptance from various countries including European Union members and the rest of the world in the past 15 years. Incineration has the ability decrease 90 % the volume of waste to be used in landfills, increasing the useful life of existing as well as a reduction in the emission of greenhouse gases. MSW incineration systems have a low global warming potential (GWP). now has become a less important source of dioxins and furans due to the current available technology. MSW incineration with energy recovery could contribute considerably in the energy matrix, thus promote the conservation of non-renewable resources. This paper proposes the assessment the technical and economic feasibility of a steam cycle with conventional steam generator for MSW incineration with energy recovery for power generation in Sao Paulo City. Will be developed a thermoeconomic analysis aiming at the total power generation product of MSW incineration, and the assessment investment cost regarding the total sale of power generated. The study shows that Sao Paulo City has potential for power generation from the MSW incineration, although it has a high cost investment this technology shown as a suitable alternative for

  2. Fuzzy algorithms to generate level controllers for nuclear power plant steam generators

    International Nuclear Information System (INIS)

    Moon, Byung Soo; Park, Jae Chang; Kim, Dong Hwa; Kim, Byung Koo

    1993-01-01

    In this paper, we present two sets of fuzzy algorithms for the steam generater level control; one for the high power operations where the flow error is available and the other for the low power operations where the flow error is not available. These are converted to a PID type controller for the high power case and to a quadratic function form of a controller for the low power case. These controllers are implemented on the Compact Nuclear Simulator at Korea Atomic Energy Research Institute and tested by a set of four simulation experiments for each. For both cases, the results show that the total variation of the level error and of the flow error are about 50% of those by the PI controllers with about one half of the control action. For the high power case, this is mainly due to the fact that a combination of two PD type controllers in the velocity algorithm form rather than a combination of two PI type controllers in the position algorithm form is used. For the low power case, the controller is essentially a PID type with a very small integral component where the average values for the derivative component input and for the controller output are used. (Author)

  3. Economic impact of latent heat thermal energy storage systems within direct steam generating solar thermal power plants with parabolic troughs

    International Nuclear Information System (INIS)

    Seitz, M.; Johnson, M.; Hübner, S.

    2017-01-01

    Highlights: • Integration of a latent heat thermal energy storage system into a solar direct steam generation power cycle. • Parametric study of solar field and storage size for determination of the optimal layout. • Evaluation of storage impact on the economic performance of the solar thermal power plant. • Economic comparison of new direct steam generation plant layout with state-of-the-art oil plant layout. - Abstract: One possible way to further reduce levelized costs of electricity of concentrated solar thermal energy is to directly use water/steam as the primary heat transfer fluid within a concentrated collector field. This so-called direct steam generation offers the opportunity of higher operating temperatures and better exergy efficiency. A technical challenge of the direct steam generation technology compared to oil-driven power cycles is a competitive storage technology for heat transfer fluids with a phase change. Latent heat thermal energy storages are suitable for storing heat at a constant temperature and can be used for direct steam generation power plants. The calculation of the economic impact of an economically optimized thermal energy storage system, based on a latent heat thermal energy storage system with phase change material, is the main focus of the presented work. To reach that goal, a thermal energy storage system for a direct steam generation power plant with parabolic troughs in the solar field was thermally designed to determine the boundary conditions. This paper discusses the economic impact of the designed thermal energy storage system based on the levelized costs of electricity results, provided via a wide parametric study. A state-of-the-art power cycle with a primary and a secondary heat transfer fluid and a two-tank thermal energy storage is used as a benchmark technology for electricity generation with solar thermal energy. The benchmark and direct steam generation systems are compared to each other, based respectively

  4. Study on the Fluid Leak Diagnosis for Steam Valve in Power Plant

    International Nuclear Information System (INIS)

    Lee, Sang-Guk; Park, Jong-Hyuck; Yoo, Keun-Bae; Lee, Sun-Ki; Hong, Sung-Yull

    2006-01-01

    This study aims to estimate the applicability of acoustic emission(AE) method for the internal fluid leak from the valves. In this study, 4 inch gate steam valve leak tests were performed in order to analyze AE properties when leaks arise in valve seat. As a result of leak test for valve seat in a secondary system of power plant, we conformed that leak sound level increased in proportion to the increase of leak rate, and leak rates were compared to simulated tests. The resulting plots of leak rate versus peak frequency and AE signal level were the primary basis for determining the feasibility of quantifying leak acoustically. Previously, the large amount of data attained also allowed a favorable investigation of the effects of different leak paths, leak rates, pressure differentials through simulated test. All results of application tests are compared with results of simulated test. From the application tests, it was suggested that the AE method for diagnosis of steam leak was applicable. This paper presents quantitative measurements of fluid valve leak conditions by the analysis of AE parameter, FFT(fast fourier transform) and RMS(root mean square) level. Test apparatus were fabricated to accept a variety of leaking steam valves in order to determine what characteristics of AE signal change with leak conditions. The data for each valve were generated by varying the leak rate and recording the averaged RMS level versus time and frequency versus amplitude(FFT). Leak rates were varied by the valve differential pressure and valve size and leaking valves were observed in service. Most of the data analysis involved plotting the leak rate versus RMS level at a specific frequency to determine how well the two variables correlate in terms of accuracy, resolution, and repeatability

  5. Improvement of testing techniques for inspecting steam turbine rotor in power plant

    International Nuclear Information System (INIS)

    Su, Yeong Shuenn; Wei, Chieng Neng; Wu, Chien Wen; Wu, Yung How

    1997-01-01

    Steam turbine rotor is important to the Utility industry, it degrades over time due to fatigue and corrosion under high temperature and high pressure environment. Periodic inspection is required in the wake of plant annual overhaul to ensure the integrity of turbine rotor. Non-Destructive Testing of turbine rotor is usually performed using magnetic particle testing with wet fluorescent magnetic particle. However, it is very difficult to ensure the reliability of inspection due to the limitation of using one NDT method only. The crack-susceptible areas, such as turbine blade, and blade root have high incidence of stress corrosion cracking, The blade root section is difficult to locate cracks because of the complex geometry which may cause inadequate magnetic field and poor accessibility. Improved inspection practices was developed by our Department, together with remaining life analysis, in maintaining the high availability of steam turbine rotor. The newly-developed inspection system based on the practical study of magnetic field strength distribution, quality of magnetic particle bath and a combination of different NDT methods with Eddy Current Testing using absolute pen-type coil and Visual Testing using reflective mirror to examine the key areas concerned are described. TPC' experience with the well-trained technicians together with the adequate inspection procedure in detecting blade-root flaws are also discussed in the paper. Many of these inspection improvement have been applied in the fields for several times and the inspection reliability has been enhanced substantially. Results are quite encouraging and satisfactory.

  6. An autonomous nuclear power plant with integrated nuclear steam supply system designed for electric power and heat supply in remote areas with difficult access

    International Nuclear Information System (INIS)

    Adamovich, L.A.; Grechko, G.I.; Lapin, B.D.; Ulasevich, V.K.; Shishkin, V.A.

    1997-01-01

    The paper contains basic conceptual principles used to develop the technical assignment for an autonomous nuclear power plant with integrated nuclear steam supply system (NSSS) designed to provide heat and electricity for areas which are remote with difficult access. The paper also describes technical procedures and equipment, NPP thermal hydraulic flow chart, steam generator design, safety aspects as well as operational and maintenance procedures. (author)

  7. The Preliminary Study of Utilization of Water Chestnut as Supercapacitor Electrode Using Steam Activation

    Directory of Open Access Journals (Sweden)

    Zulkifli Zulkifli

    2018-01-01

    Keywords: Purun tikus, superkapasitor, siklis voltammetri, kapasitansi spesifik, perairan REFERENCE Asikin, S. dan Thamrin, M. 2012. Manfaat Purun Tikus (Eleocharis Dulcis Pada Ekosistem Sawah Rawa. Jurnal Litbang Pertanian, 31(1: 35-42 Arepalli, S., Fireman, H., Huffman, C., Moloney, P., Nikolaev, P., Yowell, L., Higgins, C. D., Kim, K., Kohl, P. A., Turano, S. P. and Ready W. J. 2005. Carbon-nanotube-based electrochemical double-layer capacitor technologies for spaceflight applications. Journal of  The Minerals, Metals and Materials Society, 57:26-31. Erari, S.S., Mangimbulude, J., Lewerissa, K. 2012. Pencemaran Organik di Perairan Pesisir Pantai Teluk Youtefa Kota Jayapura, Papua. Prosiding Seminar Nasional Kimia Unesa. ISBN 978-979-028-550-7. (C: 327-340. Farma, R., Deraman, M., Awitdrus, A., Talib, I.A.  Taer, E., Basri, N.H., Manjunatha, J.G., Ishak, M.M., Dollah, B.N.M., Hashmi, S.A. 2013.  Preparation of highly porous binderless activated carbon electrodes from fibres of oil palm empty fruit bunches for application in supercapacitors. Bioresource Technology. 132:254–261 Feng, C.W., R.L. Tseng., C.C. Hu., C.C Wang., 2015, Effects of pore structure and electrolyte on the capasitive characteristics of steam and KOH activated carbons for supercapasitors, Journal of power sources. 144:302-309. Ionnidou, A and Zabaniotu. 2007. Agricultural residues of precursors for activated carbon production–a review, Renewable and sustainable energy reviews. 11:1705-1966. Kurniawan, F., Wongso, M., Ayucitra, A., Soetaredjo F.E., Angkawijaya A. E., Ju,Y. H., Ismadji, S. 2014. Carbon microsphere from water hyacinth for supercapacitor electrode. Journal of the Taiwan Institute of Chemical Engineers. 47: 197-201. Liu, B., Zhou, X., Chen, H., Liu, Y., Li, H. 2016. Promising porous carbons derived from lotus seedpods with outstanding supercapacitance performance. Electrochimica Acta. 208 :55–63. Taer, E., Mustika, W.S., Zulkifli, Syam, I.D.M., Taslim, R. Pengaruh Suhu

  8. A Comparison of Nuclear Power Plant Simulator with RELAP5/MOD3 code about Steam Generator Tube Rupture

    International Nuclear Information System (INIS)

    Kim, Sung Hyun; Moon, Chan Ki; Park, Sung Baek; Na, Man Gyun

    2013-01-01

    The RELAP5/MOD3 code introduced in cooperation with U. S. NRC has been utilized mainly for validation calculation of accident analysis submitted by licensee in Korea. The Korea Institute of Nuclear Safety has built a verification system of LWR accident analysis with RELAP5/MOD3 code engine. Therefore, the simulator replicates the design basis accident and its results are compared with RELAP5/MOD3 code results that will have important implications in the verification of the simulator in the future. The SGTR simulations were performed by the simulator and its results were compared with ones by RELAP5/MOD3 code in this study. Thus, the results of this study can be used as materials to build the verification system of the nuclear power plant simulator. We tried to compare with RELAP5/MOD3 verification code by replicating major parameters of steam generator tube rupture using the simulator for OPR-1000 in Yonggwang training center. By comparing the changes in temperature, pressure and inventory of the reactor coolant system and main steam system during the SGTR, it was confirmed that the main behaviors of SGTR which the simulator and RELAP5/MOD3 code showed are similar. However, the behavior of SG pressure and level that are important parameters to diagnose the accident were a little different. We estimated that RELAP5/MOD3 code was not reflected the major control systems in detail, such as FWCS, SBCS and PPCS. The different behaviors of SG level and pressure in this study should be needed an additional review. As a result of the comparison, the major simulation parameters behavior by RELAP5/MOD3 code agreed well with the one by the simulator. Therefore, it is thought that RELAP5/MOD3 code is used as a tool for validation of NPP simulator in the near future through this study

  9. Dryout occurrence in a helically coiled steam generator for nuclear power application

    Directory of Open Access Journals (Sweden)

    Santini L.

    2014-03-01

    Full Text Available Dryout phenomena have been experimentally investigated in a helically coiled steam generator tube. The experiences carried out in the present work are part of a wide experimental program devoted to the study of a GEN III+ innovative nuclear power plant [1].The experimental facility consists in an electrically heated AISI 316L stainless steel coiled tube. The tube is 32 meters long, 12.53 mm of inner diameter, with a coil diameter of 1m and a pitch of 0.79 m, resulting in a total height of the steam generator of 8 meters. The thermo-hydraulics conditions for dryout investigations covered a spectrum of mass fluxes between 199 and 810 kg/m2s, the pressures ranges from 10.7 to 60.7 bar, heat fluxes between 43.6 to 209.3 kW/m2.Very high first qualities dryout, between 0.72 and 0.92, were found in the range of explored conditions, comparison of our results with literature available correlations shows the difficulty in predicting high qualities dryout in helical coils., immediately following the heading. The text should be set to 1.15 line spacing. The abstract should be centred across the page, indented 15 mm from the left and right page margins and justified. It should not normally exceed 200 words.

  10. Application of perturbation methods for sensitivity analysis for nuclear power plant steam generators

    International Nuclear Information System (INIS)

    Gurjao, Emir Candeia

    1996-02-01

    The differential and GPT (Generalized Perturbation Theory) formalisms of the Perturbation Theory were applied in this work to a simplified U-tubes steam generator model to perform sensitivity analysis. The adjoint and importance equations, with the corresponding expressions for the sensitivity coefficients, were derived for this steam generator model. The system was numerically was numerically solved in a Fortran program, called GEVADJ, in order to calculate the sensitivity coefficients. A transient loss of forced primary coolant in the nuclear power plant Angra-1 was used as example case. The average and final values of functionals: secondary pressure and enthalpy were studied in relation to changes in the secondary feedwater flow, enthalpy and total volume in secondary circuit. Absolute variations in the above functionals were calculated using the perturbative methods, considering the variations in the feedwater flow and total secondary volume. Comparison with the same variations obtained via direct model showed in general good agreement, demonstrating the potentiality of perturbative methods for sensitivity analysis of nuclear systems. (author)

  11. Steam Generator Lancing and FOSAR for HANUL Nuclear Power Plant Unit 2

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woo-Tae [Korea Hydro and Nuclear Power Co. Ltd. Central Research Institute, Daejeon (Korea, Republic of); Kim, Sang-Tae; Yoon, Sang-Jung; Seo, Hong-Chang [Sae-An Engineering Corporation, Seoul (Korea, Republic of)

    2015-05-15

    Sludge weight removed during the deposit removal operation was 10.68 kg. Annulus, tubelane, and in-bundle area of the steam generators were searched for possible foreign objects. Three foreign objects were found and removed. Mock-up training before the operation was helpful to finish the service as scheduled. Sludge lancing and FOSAR were Sludge lancing and FOSAR were successfully completed for Hanul nuclear power plant unit 2 during the 19''t''h outage. Mock-up training before the service was helpful for the operators to finish the job on time. Inspection, barrel spray, final barrel/flushing, and sludge collector cleaning was completed for the three steam generators 'A', 'B', and 'C.' Six bag filters and 42 cartridge filters were consumed to remove 10.68 kg of sludge. Three foreign objects were found and removed. One foreign object (HU2R19SGB01) was found in SG 'B', and two objects (HU2R19SGC01, HU2R19SGC02) were found in SG 'C.'.

  12. Ultrasonic imaging of tube/support structure of power plant steam generators

    International Nuclear Information System (INIS)

    Saniie, J.; Nagle, D.T.

    1987-01-01

    The corrosion and erosion of steam generator tubing in nuclear power plants can present problems of both safety and economics. In steam generators, the inconel tubes are fit loosely through holes drilled in carbon steel support plates. Corrosion is of particular concern with such tube/support plate structures. Non-protective magnetite can build up on the inner surface of the support plate holes, and allowed to continue unchecked, will fill the gap, eventually denting and fracturing the tube walls. Therefore, periodic nondestructive inspection can be valuable in characterizing corrosion and can be used in evaluating the effectiveness of chemical treatments used to control or reduce corrosion. Presently, they are investigating the feasibility and practicality of using ultrasound in routing testing for gap measurement, for evaluating the corrosion and assessing the degree of denting. The tube/support structure can be modeled as a multilayer, reverberant target, which when tested with ultrasound results in two sets of reverberating echoes [1]. One set corresponds to the tube wall and the other to the support plate. These echoes must be decomposed and identified in order to evaluate the tube/support structure. This report presents experimental results along with a discussion of various measurements and processing techniques for decomposing and interpreting tube/support echoes at different stages of corrosion

  13. Nuclear steam supply system KLT-40 enhanced safety as independent power supply source. Employment prospects

    International Nuclear Information System (INIS)

    Polunichev, V.I.; Sayanov, D.G.; Ardabievsky, A.A.

    1993-01-01

    High quality of KLT-40 nuclear steam supply system (NSSS) providing enhanced safety is attained owing to the development and operation experience of equipments and systems in Soviet nuclear icebreakers. First of all they are the operating nuclear-powered icebreakers open-quotes Arktikaclose quotes, open-quotes Sibirclose quotes, open-quotes Rossiyaclose quotes, open-quotes Sovetsky Soyuzclose quotes, the limited draught icebreakers of joint Soviet-Finnish manufacturing open-quotes Taimyrclose quotes open-quotes Vaigachclose quotes. 30-years trouble-free operation of icebreaker open-quotes Leninclose quotes, the ancestor of nuclear powered fleet, is unprecedented. Operation life of individual equipment items amounts to 107000 hours, that testifies to high reliability and life characteristics of NSSS. Trouble-free operation of the nuclear-powered icebreakers' reactor plants (RPs) exceeded 130 reactor years, that proves high quality of design decisions being underlain in the basis of the KLT-40 NSSS for the lighter-cargo carrier open-quotes Sevmorputclose quotes, which was put into operation into 1988. Besides it testifies to the expediency of KLT-40 NSSS employment as a power source in different power installations. The KLT-40 is a reactor plant with a pwr type reactor. The design is described in detail with diagrams

  14. A Comparison of Organic and Steam Rankine Cycle Power Systems for Waste Heat Recovery on Large Ships

    Directory of Open Access Journals (Sweden)

    Jesper Graa Andreasen

    2017-04-01

    Full Text Available This paper presents a comparison of the conventional dual pressure steam Rankine cycle process and the organic Rankine cycle process for marine engine waste heat recovery. The comparison was based on a container vessel, and results are presented for a high-sulfur (3 wt % and low-sulfur (0.5 wt % fuel case. The processes were compared based on their off-design performance for diesel engine loads in the range between 25% and 100%. The fluids considered in the organic Rankine cycle process were MM(hexamethyldisiloxane, toluene, n-pentane, i-pentane and c-pentane. The results of the comparison indicate that the net power output of the steam Rankine cycle process is higher at high engine loads, while the performance of the organic Rankine cycle units is higher at lower loads. Preliminary turbine design considerations suggest that higher turbine efficiencies can be obtained for the ORC unit turbines compared to the steam turbines. When the efficiency of the c-pentane turbine was allowed to be 10% points larger than the steam turbine efficiency, the organic Rankine cycle unit reaches higher net power outputs than the steam Rankine cycle unit at all engine loads for the low-sulfur fuel case. The net power production from the waste heat recovery units is generally higher for the low-sulfur fuel case. The steam Rankine cycle unit produces 18% more power at design compared to the high-sulfur fuel case, while the organic Rankine cycle unit using MM produces 33% more power.

  15. Automatic system for redistributing feedwater in a steam generator of a nuclear power plant

    International Nuclear Information System (INIS)

    Fuoto, J.S.; Crotzer, M.E.; Lang, G.E.

    1980-01-01

    A system is described for automatically redistributing a steam generator secondary tube system after a burst in the secondary tubing. This applies to a given steam generator in a system having several steam generators partially sharing a common tube system, and employs a pressure control generating an electrical signal which is compared with given values [fr

  16. Influence of the loop design of the feedwater- and steam quality in a power plant with pressurized water reactor

    International Nuclear Information System (INIS)

    Bennert, J.; Becher, L.

    1977-01-01

    At nuclear power plants with pressurized water reactors, condensate occurs on the high pressure part of the water-steam circuit, caused by the operation with low steam parameters. The behaviour of the electrolytes which entered into the circuit (solubility, distribution in water and/or steam) shows that these electrolytes (salts) are to be found mainly in the condensate. The insinuated electrolytes are reconcentrated during the common arrangements with 'Small Circuit' - consisting of steam generator, high pressure turbine, water separator, feedwater vessel, and have a negative influence on the feedwater - boiler water - and the steam quality. Remedy is possible by modified arrangements, during which these electrolyte-containing condensates will be treated and traced back into the main circuit. Nevertheless that the efficiency decrease is insignificant and additional efforts are necessary, a change over to these arrangements is recommendable, due to the fact that the feedwater quality, the boiler water quality, the steam quality in front of the turbine, and finally also the operational safety, as well as the availability will be improved. (orig.) [de

  17. Surry Power Station secondary water chemistry improvement since steam generator replacement and the unit two feedwater pipe rupture

    International Nuclear Information System (INIS)

    Swindell, E.T.

    1988-01-01

    Surry Power Station has two Westinghouse-designed three-loop PWRs of 811 MWe design rating. The start of commercial operation was in July, 1972 in No.1 plant, and May, 1973 in No.2 plant. Both plants began the operation using controlled phosphate chemistry for the steam generators. In 1975, both plants were converted to all volatile treatment on the secondary side due to the tube wall thinning corrosion in the steam generators, which was associated with the phosphate sludge that was building up on the tube sheets and created acidic condition. Thereafter, condenser and air leakage and steam generator denting occurred, and after the operation of 8 years 2 month of No.1 plant and 5 years 9 months of No.2 plant, the steam generators were replaced. A major plant improvement program was designed and implemented from 1979 to 1980. The improvement in new steam generators, the modification for preventing corrosion, the addition of a steam generator blowdown recovery system, the reconstruction of condensers, the installation of full flow, deep bed condensate polishers, the addition of Dionex 8,000 on-line ion chromatograph, a long term maintenance agreement with Westinghouse and so on are reported. (Kako, I.)

  18. Steam water cycle chemistry of liquid metal cooled innovative nuclear power reactors

    International Nuclear Information System (INIS)

    Yurmanov, Victor; Lemekhov, Vadim; Smykov, Vladimir

    2012-09-01

    selection of chemistry controls is vital for NPPs with liquid metal cooled reactors. This paper highlights principles and approaches to chemistry controls in steam/water cycles of future NPPs with innovative liquid metal cooled reactors. The recommendations on how to arrange chemistry controls in steam/water cycles of future NPPs with innovative liquid metal cooled reactors are based taking into account: - the experience with operation of fossil power industry; - secondary side water chemistry of lead-bismuth eutectics cooled nuclear reactors at submarines; - steam/water cycles of NPPs with sodium cooled fast breeders BN-350 and BN-600; - secondary water chemistry at conventional NPPs with WER, RBMK and some other reactors. (authors)

  19. Evaluation of the useful life of steam turbine rotors; Evaluacion de vida util de rotores de turbinas de vapor

    Energy Technology Data Exchange (ETDEWEB)

    Carnero Parra, Antonio; Garcia Illescas, Rafael; Kubiak Szyszka, Janusz [Instituto de Investigaciones Electricas, Temixco, Morelos (Mexico)

    1999-07-01

    This article presents the methodology applied by the Management of Turbomachinery of the Institute of Investigaciones Electricas (IIE), for the evaluation of the remaining useful life of steam turbine rotors in the phase of initiation of fissures. The evaluation of the remaining useful life of turbines, will reveal the real state of health of the rotor and will serve as a base for the future decision making that guarantees their structural integrity. [Spanish] El presentes articulo presenta la metodologia aplicada por la Gerencia de Turbomaquinaria del Instituto de Investigaciones Electricas (IIE), para la evaluacion de la vida util remanente de rotores de turbinas de vapor en la fase de iniciacion de fisuras. La evaluacion de la vida util de turbinas, revelar el estado real de salud del rotor y servira de base para la toma de decisiones futuras que garanticen su integridad estructural.

  20. CANDU steam generator life management

    International Nuclear Information System (INIS)

    Tapping, R.L.; Nickerson, J.; Spekkens, P.; Maruska, C.

    1998-01-01

    Steam generators are a critical component of a nuclear power reactor, and can contribute significantly to station unavailability, as has been amply demonstrated in Pressurized Water Reactors (PWRs). CANDU steam generators are not immune to steam generator degradation, and the variety of CANDU steam generator designs and tube materials has led to some unexpected challenges. However, aggressive remedial actions, and careful proactive maintenance activities, have led to a decrease in steam generator-related station unavailability of Canadian CANDUs. AECL and the CANDU utilities have defined programs that will enable existing or new steam generators to operate effectively for 40 years. Research and development work covers corrosion and mechanical degradation of tube bundles and internals, chemistry, thermalhydraulics, fouling, inspection and cleaning, as well as provision for specially tool development for specific problem solving. A major driving force is development of CANDU-specific fitness-for-service guidelines, including appropriate inspection and monitoring technology to measure steam generator condition. Longer-range work focuses on development of intelligent on-line monitoring for the feedwater system and steam generator. New designs have reduced risk of corrosion and fouling, are more easily inspected and cleaned, and are less susceptible to mechanical damage. The Canadian CANDU utilities have developed programs for remedial actions to combat degradation of performance (Gentilly-2, Point Lepreau, Bruce A/B, Pickering A/B), and have developed strategic plans to ensure that good future operation is ensured. The research and development program, as well as operating experience, has identified where improvements in operating practices and/or designs can be made in order to ensure steam generator design life at an acceptable capacity factory. (author)

  1. Electric utility companies and geothermal power

    Science.gov (United States)

    Pivirotto, D. S.

    1976-01-01

    The requirements of the electric utility industry as the primary potential market for geothermal energy are analyzed, based on a series of structured interviews with utility companies and financial institution executives. The interviews were designed to determine what information and technologies would be required before utilities would make investment decisions in favor of geothermal energy, the time frame in which the information and technologies would have to be available, and the influence of the governmental politics. The paper describes the geothermal resources, electric utility industry, its structure, the forces influencing utility companies, and their relationship to geothermal energy. A strategy for federal stimulation of utility investment in geothermal energy is suggested. Possibilities are discussed for stimulating utility investment through financial incentives, amelioration of institutional barriers, and technological improvements.

  2. Utilization of steam- and explosion-decompressed aspen wood by some anaerobes

    Energy Technology Data Exchange (ETDEWEB)

    Khan, A W; Asther, M; Giuliano, C

    1984-01-01

    Tests made to study the suitability of using steam- and explosion-decompressed aspen wood as a substrate in anaerobic fermentations indicated that after washing with dilute NaOH it becomes less than 80% accessible to both mesophilic and thermophilic cellulolytic anaerobes and cellulases, compared with delignified, ball-milled pulp. After washing, this material was also suitable for the single-step conversion of cellulose to EtOH using cocultures consisting of cellulolytic and EtOH-producing saccharolytic anaerobes; and without and after washing by the use of cellulolytic enzymes and ethanologenic anaerobes.

  3. 15 years steam generator experience in German PWR power plants; part II: replacement of two completely assembled steam generators within ten weeks

    International Nuclear Information System (INIS)

    Scheuktanz, G.; Bouecker, R.; Riess, R.; Soellner, P.; Stieding, L.; Termeuhlen, H.

    1984-01-01

    This paper reports on the replacement of two steam generators at the Obrigheim power plant during a 10-week period, including a description of the methods and equipment used to do so. It is concluded that the method should be used only if transportation conditions within the reactor building preclude a complete system exchange and that one of the main reasons for the success of this operation was the very close relationship established between plant personnel and the equipment supplier and contractor, a relationship which began when the project was in the planning stage

  4. Studying heat integration options for steam-gas power plants retrofitted with CO2 post-combustion capture

    International Nuclear Information System (INIS)

    Carapellucci, Roberto; Giordano, Lorena; Vaccarelli, Maura

    2015-01-01

    Electricity generation from fossil fuels has become a focal point of energy and climate change policies due to its central role in modern economics and its leading contribution to greenhouse gas emissions. Carbon capture and sequestration (CCS) is regarded by the International Energy Agency as an essential part of the technology portfolio for carbon mitigation, as it can significantly reduce CO 2 emissions while ensuring electricity generation from fossil fuel power plants. This paper studies the retrofit of natural gas combined cycles (NGCCs) with an amine-based post-combustion carbon capture system. NGCCs with differently rated capacities were analysed under the assumptions that the heat requirement of the capture system was provided via a steam extraction upstream of the low-pressure steam turbine or by an auxiliary unit that was able to reduce the power plant derating related to the energy needs of the CCS system. Different types of auxiliary units were investigated based on power plant size, including a gas turbine cogeneration plant and a supplementary firing unit or boiler fed by natural gas or biomass. Energy and economic analyses were performed in order to evaluate the impact of type and layout of retrofit option on energy, environmental and economic performance of NGCCs with the CCS system. - Highlights: • Steam-gas power plants with an amine-based CO 2 capture unit are examined. • The study concerns three combined cycles with different capacity and plant layout. • Several options to fulfil the heat requirement of the CCS system are explored. • Steam extraction significantly reduces the capacity of steam-gas power plant. • An auxiliary combined heat and power unit allows to reduce power plant derating

  5. A nuclear power unit with a Babcock type steam generating system-analysis of the break-down in the Three Mile Island power plant

    International Nuclear Information System (INIS)

    Werner, A.

    1980-01-01

    Installations of the primary and the secondary circuits and basic automatic control and protection systems for a nuclear power unit with Babcock type vertical, once-through steam generator are described. On this background the course of the break-down in the Three Mile Island power plant at Harrisburg is presented and analysed. (author)

  6. 76 FR 77022 - In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2...

    Science.gov (United States)

    2011-12-09

    ... and 72-3] In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2, H. B. Robinson Steam Electric Plant, Unit 2, Independent Spent Fuel Storage Installation; Order Approving Indirect Transfer of Control of Licenses I. Carolina Power & Light Company (CP&L, the licensee) is...

  7. International style interior in the historical steam power plant in Žilina

    Directory of Open Access Journals (Sweden)

    Grúňová Zuzana

    2016-01-01

    Full Text Available The article deals with one of the examples of good interior design in Slovak functionalist architecture uncovered during recent restorational research (2016. It points out that even provincial, small but growing town, which Žilina in the northern Slovakia region was at that time, can be a place of high-quality implementation of aesthetically valuable and structurally developed architectural design. The high level of composition, choice of color scheme, quality of materials and attention to detail prove the fact, that the architect František Bednárik mastered to apply international style ideas also to a small extent reconstruction of the original steam power plant in Žilina.

  8. Preventive acid chemical cleaning operation (PACCO) on steam generator in French nuclear power plants

    International Nuclear Information System (INIS)

    Traino, Jules; Ruiz Martinez, Jose Thomas; Rottner, Bernard; Vedova, Eric

    2014-01-01

    Steam Generators (SG) usually present important deposit loading and Tube Support Blockage, resulting from Secondary Side corrosion products. These phenomena modify SG behavior which can lead to safety, heat exchange performance and lifetime problems. In this context, a Chemical Cleaning Process (PACCO) was designed to solve the issue. After almost two years of intensive lab tests, pilot simulation and mock-ups, the chemical process was finally qualified by EDF. The aim of the work was firstly the development in laboratory of a chemical process that could eliminate partially the deposit loading, respecting the integrity of materials and gas emission limits. Secondly, the objective was the design and the implementation of the process on-site. The process has been applied successfully in 3 SG in Dampierre nuclear power plant in France on July 2013. The main results were: - Corrosion < 100 μm. - 40% of the initial deposit loading, removed by SG. (authors)

  9. Stress corrosion cracking of steam generator tube and primary pipe in PWR type nuclear power plants

    International Nuclear Information System (INIS)

    Zhang Weiguo; Gao Fengqin; Zhou Hongyi

    1992-03-01

    The behavior of stress corrosion cracking (SCC) was studied by slow strain rate test (SSRT), constant load test (CLT) and low frequency cyclic loading test (LFCLT). The purpose of these tests is to get the test data for evaluating the integrity of pressurized boundary of pipes in Qinshan and Guangdong nuclear power plants (NPPs). Tested materials are 316 nuclear grade stainless steel (SS) for primary pipes in welded heat affected zone (WHAZ) and tubes of heat transfer, such as Incoloy-800, Inconel-600 and 321 SS which are used for steam generator in PWR NPPs. The effects of material metallurgy, shot peening treatment, tensile load, strain rate, cyclic load and water chemistry on the behavior of SCC were considered

  10. Steam generator tube performance: experience with water-cooled nuclear power reactors during 1983 and 1984

    International Nuclear Information System (INIS)

    Tatone, O.S.; Meindl, P.; Taylor, G.F.

    1986-06-01

    A review of the performance of steam generator tubes in water-cooled nuclear power reactors showed that tubes were plugged at 47 (35.6%) of the reactors in 1983 and at 63 (42.6%) of the reactors during 1984. In 1983 and 1984 3291 and 3335 tubes, respectively, were removed from service, about the same as in 1982. The leading causes assigned to tube failure were stress corrosion cracking from the primary side and stress corrosion cracking or intergranular attack from the secondary side. In addition 5668 tubes were repaired for further service by installation of internal sleeves. Most of these were believed to have deteriorated by one of the above mechanisms or by pitting. There is a continuing trend towards high-integrity condenser tube materials at sites cooled by brackish or sea water. 31 refs

  11. Fish protection at steam-electric power plants: alternative screening devices

    International Nuclear Information System (INIS)

    Cannon, J.B.

    1978-01-01

    Since the enactment of the Federal Water Pollution Control Act Amendments of 1972, very few innovations have surfaced that advance the state of intake technology for fish protection at steam-electric power plants. After careful examination of basic hydrology, hydraulics, and ecology of the source water body is completed and after a suitable location for the intake is established, the design process reduces to the development of proper screening techniques and to the provision of a means of preventing resident and migratory species from entering the intake structure. As a result of this design process, three basic fish protection concepts have evolved: fish deterrence, fish collection and removal, and fish diversion. Intake screening devices that protect fish are discussed

  12. CFD analyses of steam and hydrogen distribution in a nuclear power plant

    International Nuclear Information System (INIS)

    Siccama, N.B.; Houkema, M.; Komen, E.M.J.

    2003-01-01

    A detailed three-dimensional Computational Fluid Dynamics (CFD) model of the containment of the nuclear power plant has been prepared in order to assess possible multidimensional phenomena. In a first code-to-code comparison step, the CFD model has been used to compute a reference accident scenario which has been analysed earlier with the lumped parameter code SPECTRA. The CFD results compare qualitatively well with the SPECTRA results. Subsequently, the actual steam jet from the primary system has been modelled in the CFD code in order to determine the hydrogen distribution for this realistically modelled source term. Based on the computed hydrogen distributions, it has been determined when use of lumped parameter codes is allowed and when use of CFD codes is required. (author)

  13. Eddy currents signal processing for steam generator inspection in PWR nuclear power plants

    International Nuclear Information System (INIS)

    Georgel, B.

    1992-01-01

    Steam generator tubes in nuclear power plants are periodically checked by means of eddy current probes. The output of a probe is composed of three types of signals: known events (rolling zone, support plates, U-bend part), noise (mainly metallurgical noise) and possible flaws. The latter are random transients, both in arrival time and in shape: they have to be detected and then estimated, before to be fed to the high level stages of a diagnostic system. The objective of the study presented is to develop a semi-automatic system, which could manage and process more than 1 M-bytes of data per tube and provide an operator with reliable diagnostics proposals within a few minutes. This can be achieved only by cooperation of several digital signal processing techniques: detection, segmentation, estimation, noise subtraction, adaptive filtering, modelization, pattern recognition. The paper describes some of these items

  14. Digital simulation of a commercial scale high temperature gas-cooled reactor (HTGR) steam power plant

    International Nuclear Information System (INIS)

    Ray, A.; Bowman, H.F.

    1978-01-01

    A nonlinear dynamic model of a commercial scale high temperature gas-cooled reactor (HTGR) steam power plant was derived in state-space form from fundamental principles. The plant model is 40th order, time-invariant, deterministic and continuous-time. Numerical results were obtained by digital simulation. Steady-state performance of the nonlinear model was verified with plant heat balance data at 100, 75 and 50 percent load levels. Local stability, controllability and observability were examined in this range using standard linear algorithms. Transfer function matrices for the linearized models were also obtained. Transient response characteristics of 6 system variables for independent step distrubances in 2 different input variables are presented as typical results

  15. Dynamic analysis of multi layer foundation of steam turbines in nuclear power plants

    International Nuclear Information System (INIS)

    Hosseni, D.

    1999-01-01

    In this work, the coupled Rotor-pedestal-foundation motion is modeled and formulated. Transfer matrix method is implemented in the modeling. The model is adequate for multi layer foundation systems of steam turbines in nuclear power plants. The rotor modeled used is distributed mass model. Bearings are modeled with eight stiffness and damping coefficients and pedestals by mass, stiffness and damping property. Foundation is modeled with distributed mass and stiffness properties in which properties in vertical and horizontal direction may be different. The model is examined using analytical results and good agreement is achieved. Results of the coupled modeling indicate less error in comparison with previous separate modeling and lumped-mass methods

  16. Sodium monitoring in the water and steam cycle of power plants

    Energy Technology Data Exchange (ETDEWEB)

    Dudouit, P. [Ecole Nationale Superieure d' Electricite et de Mecanique, Nancy (France); Guillou, P.; Hostis, E. l' [Hach Ultra Analytics SA, Vesenaz (Switzerland)

    2006-11-15

    Today sodium concentration has become one of the most important indexes for quality control of water and steam at power plants; however, measurement of this parameter can be difficult in practice. The use of ion selective electrodes means that analyzers are sensitive to pH shifts, and constant exposure to very low concentrations of sodium ions in ultrapure water conditions can lead to electrode desensitization. In addition, there is a need to address drift through regular calibration. This paper discusses the technical challenges in low level sodium analysis and the required features for a practical and accurate analyzer to provide trouble free, sub {mu}g.kg{sup -1} (sub ppb) measurement. (orig.)

  17. Steam generator tube performance: world experience with water-cooled nuclear power reactors during 1979

    International Nuclear Information System (INIS)

    Tatone, O.S.; Pathania, R.S.

    1981-01-01

    The performance of steam generator tubes in water-cooled nuclear power reactors is reviewed for 1979. Tube failures occurred at 38 of the 93 reactors surveyed. The causes of these failures and the procedures designed to deal with them are described. The defect rate, although higher than that in 1978, was still lower than the rates of the two previous years. Methods being employed to detect defects include the increased use of multifrequency eddy-current testing and a trend to full-length inspection of all tubes. To reduce the incidence of tube failure by corrosion, plant operators are turning to full-flow condensate demineralization and more leak-resistant condenser tubes. 10 tables

  18. Nuclear Power Plant Steam Pipes repairing with Tirant 3R Robot System

    International Nuclear Information System (INIS)

    Ruiz-Martinez, Jose-Tomas; Soto-Tomas, Marcelo; Curiel-Nieva, Marceliano; Monzo-Blasco, Enrique; Pineda-Rodriguez, Salvador; Vaquer-Perez, Juan-Ignacio

    2012-09-01

    The metallization arc spray process is based on the projection of molten metal, supplied by means of different stainless alloys wire, over a surface of carbon steel usually, with the object of serving as protection against flow assisted corrosion (FAC), increasing resistance to abrasion and deteriorations. A typical application functions covering the steam pipes inner surface in Coal-fired power station and Nuclear Power Plants. The results of this process are spectacular in terms of protection against flow assisted corrosion and abrasion, but its application has conditioning factors, such as: Severe application conditions for workers. Due to the worker's postural position (usually kneeling) in 32' diameter pipes and working with fireproof clothing and masks with outdoor air supplying, due to fumes, sparks and molten metal particles, radiological contamination, confined space, poor lighting... Coating uniformity. As metallization is a manual process, the carried out measurements show small variations in the thickness of the coating, always within the tolerance limits established by the applicable regulations and Quality Assurance. An increase in the uniformity of the projected coating, increase the resistance and give a better surface protection. For all these reasons, Lainsa has developed the TIRANT 3 R system, a worldwide innovative system, for metallization of steam pipes inner surface. TIRANT 3 R system is tele-operated from outside of the pipe, so that human intervention is reduced to the operations of robot positioning and change of metallization wire. As it is an independent system of the human factor, metallization process performance is significantly increased by reducing rest periods due only to the robot maintenance. Likewise, TIRANT 3 R system permits to increase resulting coating uniformity and thus its resistance, keeping selected parameters constant (forward speed, rotation speed and inner surface distance) depending on required type and

  19. Nuclear power plant steam pipes repairing with Tirant 3 Robot system

    Energy Technology Data Exchange (ETDEWEB)

    Soto, M.; Curiel, M. [Logistica y Acondicionamientos Industriales SAU, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Lazaro, F. [Revestimientos Anticorrosivos Industriales, S. L. U., Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Arnaldos, A., E-mail: m.soto@lainsa.co [TITANIA Servicios Tecnologicos SL, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain)

    2010-10-15

    The metallization arc spray process is based on the projection of molten metal, supplied by means of different stainless alloys wire, over a surface of carbon steel usually, with the object of serving as protection against erosion-corrosion, increasing resistance to abrasion and detrition. A typical application functions covering the steam pipes inner surface in coal-fired power station and nuclear power plants. The results of this process are spectacular in terms of protection against corrosion and abrasion, but its application has conditioning factors, such as: Severe application conditions for workers. Due to the worker's postural position (usually kneeling) in 32 diameter pipes and working with fireproof clothing and masks with outdoor air supplying, due to fumes, sparks and molten metal particles, radiological contamination, confined space, poor lighting, ... Coating uniformity. As metallization is a manual process, the carried out measurements show small variations in the thickness of the coating, always within the tolerance limits established by the applicable regulations and quality assurance. An increase in the uniformity of the projected coating, increase the resistance and give a better surface protection. For all these reasons, Lainsa has developed the Tirant 3 robot, a worldwide innovative system, for metallization of steam pipes inner surface. Tirant 3 robot is tele operated from outside of the pipe, so that human intervention is reduced to the operations of robot positioning and change of metallization wire. As it is an independent system of the human factor, metallization process performance is significantly increased by reducing rest periods due only to the robot maintenance. Likewise, Tirant 3 system permits to increase resulting coating uniformity and thus its resistance, keeping selected parameters constant (forward speed, rotation speed and inner surface distance) depending on required type and thickness of wire. (Author)

  20. Test report light duty utility arm power distribution system (PDS)

    International Nuclear Information System (INIS)

    Clark, D.A.

    1996-01-01

    The Light Duty Utility Arm (LDUA) Power Distribution System has completed vendor and post-delivery acceptance testing. The Power Distribution System has been found to be acceptable and is now ready for integration with the overall LDUA system

  1. A Study on the Air Vent Valve of the Hydraulic Servo Actuator for Steam Control of Power Plants

    International Nuclear Information System (INIS)

    Lee, Yong Bum; Lee, Jong Jik

    2016-01-01

    To produce adequate electricity in nuclear and thermal power plants, an optimal amount of steam should be supplied to a generator connected to high- and low-pressure steam turbines. A turbine output control device, which is a special steam valve employed to supply or interrupt the steam to the turbine, is operated using a hydraulic servo actuator. In power plants, the performance of servo actuators is degraded by the air generated from the hydraulic system, or causes frequent failures owing to an increase in the wear of the seal. This is due to the seal being burnt as generated heat using the produced compressed air. Some power plants have exhausted air using a fixed orifice, and thus they encounter power loss due to mass flow exhaust. Failures are generated in hydraulic pumps, electric motors, and valves, which are frequently operated. In this study, we perform modeling and analysis of the load-sensing air-exhaust valves, which can be passed through very fine flow under normal use conditions, and exhaust mass flow air at the beginning stage as with existing fixed orifices. Then, we propose a method to prevent failures due to the compressed air, and to ensure the control accuracy of hydraulic servo actuators.

  2. Modeling Creep-Fatigue-Environment Interactions in Steam Turbine Rotor Materials for Advanced Ultra-supercritical Coal Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Shen, Chen [General Electric Global Research, Niskayuna, NY (United States)

    2014-04-01

    The goal of this project is to model creep-fatigue-environment interactions in steam turbine rotor materials for advanced ultra-supercritical (A-USC) coal power Alloy 282 plants, to develop and demonstrate computational algorithms for alloy property predictions, and to determine and model key mechanisms that contribute to the damages caused by creep-fatigue-environment interactions.

  3. A Study on the Air Vent Valve of the Hydraulic Servo Actuator for Steam Control of Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Bum; Lee, Jong Jik [Korea Institute of Machinery and Materials, Daejeon (Korea, Republic of)

    2016-06-15

    To produce adequate electricity in nuclear and thermal power plants, an optimal amount of steam should be supplied to a generator connected to high- and low-pressure steam turbines. A turbine output control device, which is a special steam valve employed to supply or interrupt the steam to the turbine, is operated using a hydraulic servo actuator. In power plants, the performance of servo actuators is degraded by the air generated from the hydraulic system, or causes frequent failures owing to an increase in the wear of the seal. This is due to the seal being burnt as generated heat using the produced compressed air. Some power plants have exhausted air using a fixed orifice, and thus they encounter power loss due to mass flow exhaust. Failures are generated in hydraulic pumps, electric motors, and valves, which are frequently operated. In this study, we perform modeling and analysis of the load-sensing air-exhaust valves, which can be passed through very fine flow under normal use conditions, and exhaust mass flow air at the beginning stage as with existing fixed orifices. Then, we propose a method to prevent failures due to the compressed air, and to ensure the control accuracy of hydraulic servo actuators.

  4. Analysis and planning of the utilization of nuclear power plants

    International Nuclear Information System (INIS)

    Skvarka, P.

    1985-01-01

    The utilization coefficient as one of the characteristics of availability of nuclear power plants and the operation results (like maximum power, block number, and electric energy generation) are investigated by different statistic methods for several nuclear power plants with PWR type reactors and compared with those of WWER 440-type reactors. By means of linear many-parameter regression analysis the utilization coefficient is studied in dependence on block power and time after reactor commissioning. Forecastings of mean utilization coefficients are presented for the power of WWER 1000-type reactors

  5. Intermediate heat exchanger and steam generator designs for the HYLIFE-II fusion power plant using molten salts

    International Nuclear Information System (INIS)

    Lee, Y.T.; Hoffman, M.A.

    1992-01-01

    The HYLIFE-II fusion power plant employs the molten salt, Flibe, for the liquid jets which form the self-healing 'first wall' of the reactor. The molten salt, sodium fluoroborate then transports the heat from the IHX's to the steam generators. The design and optimization of the IHX's and the steam generators for use with molten salts has been done as part of the HYLIFE-II conceptual design study. The results of this study are described, and reference designs of these large heat exchangers are selected to minimize the cost of electricity while satisfying other important constraints

  6. Coupled RELAP5/PANTHER/COBRA steam line break accident analysis in support of licensing DOEL 2 power uprate and steam generator replacement

    International Nuclear Information System (INIS)

    Zhang, J.; Bosso, S.; Henno, X.; Ouliddren, K.; Schneidesch, C.R.; Hove, W. van

    2004-01-01

    The nuclear reactor accident analyses using best estimate codes provide a better understanding and more accurate modeling of the key physical phenomena, which allows a more realistic evaluation of the conservatism and margins in the final safety analysis report (FSAR) accident analysis. The use of the best estimate codes and methods is necessary to meet the increasing technical, licensing and regulatory requirements for major plant changes (e.g. steam generator replacement), power uprate, core design optimization (cycle extension), as well as Periodic Safety Review. Since 1992, Tractebel Engineering (TE) has developed and applied a deterministic bounding approach to FASR accident analysis using the best estimate system thermal hydraulic code RELAP5/MOD2.5 and the subchannel thermal hydraulic code COBRA-3C. This approach has been accepted by the Belgian Safety Authorities, and turned out to be cost effective for most of the non-LOCA transient analyses. Since this approach adapts a decoupled modeling of the core responses, the analysis results often involved too large un-quantified conservatisms, due to either simplistic approximations for asymmetric accidents with strong 3D core neutronics - plant thermal hydraulics interactions, or additional penalties introduced from 'incoherent' initial/boundary conditions for separate plant and core analyses. Therefore, an external dynamic coupling between the RELAP5/MOD2.5 code and the 3-D neutronic code PANTHER was implemented since 1997 via the transient analysis code linkage program TALINK. Furthermore, a static linkage between the PANTHER code and the COBRA-3C code was developed for on-line calculation of (Departure from Nucleate Boiling Ratio (DNBR). TE intends to use the coupled code package for licensing non-symmetric FSAR accident analysis. The TE coupled code package has been applied to develop a main steam line break (MSLB) accident analysis methodology [using the TE deterministic bounding approach. The methodology

  7. Utility-Scale Concentrating Solar Power and Photovoltaic Projects: A Technology and Market Overview

    Energy Technology Data Exchange (ETDEWEB)

    Mendelsohn, M.; Lowder, T.; Canavan, B.

    2012-04-01

    Over the last several years, solar energy technologies have been, or are in the process of being, deployed at unprecedented levels. A critical recent development, resulting from the massive scale of projects in progress or recently completed, is having the power sold directly to electric utilities. Such 'utility-scale' systems offer the opportunity to deploy solar technologies far faster than the traditional 'behind-the-meter' projects designed to offset retail load. Moreover, these systems have employed significant economies of scale during construction and operation, attracting financial capital, which in turn can reduce the delivered cost of power. This report is a summary of the current U.S. utility-scale solar state-of-the-market and development pipeline. Utility-scale solar energy systems are generally categorized as one of two basic designs: concentrating solar power (CSP) and photovoltaic (PV). CSP systems can be further delineated into four commercially available technologies: parabolic trough, central receiver (CR), parabolic dish, and linear Fresnel reflector. CSP systems can also be categorized as hybrid, which combine a solar-based system (generally parabolic trough, CR, or linear Fresnel) and a fossil fuel energy system to produce electric power or steam.

  8. Manpower development for safe operation of nuclear power plant. China. Main steam bypass system operation and maintenance. Task: 6.1.6. Technical report

    International Nuclear Information System (INIS)

    Stubley, P.H.

    1994-01-01

    This mission concentrated on the Steam Bypass system of Qinshan Nuclear Power Plant. The system had experienced spurious opening of the bypass valves, disrupting the steam pressure control and the steam generator level control system. A series of commissioning type tests were defined which should allow the operators to revise the setpoints used in the control of the bypass system, and thus prevent spurious opening while maintaining the desired steam pressure control during power maneuvering. Training also included giving experience from other operating plants on aspects of steam and feedwater systems and components, especially as this experience affected maintenance or gave rise to problems. Steam generated maintenance experience is especially applicable, and a future mission is planned for an expert in this field. In addition other aspects of the Chinese nuclear program was assessed to guide future missions. This included assessment of operating procedures from an availability point of view

  9. United States Advanced Ultra-Supercritical Component Test Facility for 760°C Steam Power Plants ComTest Project

    Energy Technology Data Exchange (ETDEWEB)

    Hack, Horst [Electric Power Research Institute (EPRI); Purgert, Robert Michael [Energy Industries of Ohio

    2017-12-13

    Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in a project to build an A-USC component test facility (ComTest). A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increase cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO2 emissions, compared to CO2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the goals of the ComTest facility are to validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions, to accelerate the development of a U.S.-based supply chain for the full complement of A-USC components, and to decrease the uncertainty of cost estimates for future A-USC power plants. The configuration of the ComTest facility would include the key A-USC technology components that were identified for expanded operational testing, including a gas-fired superheater, high-temperature steam piping, steam turbine valve, and cycling header component. Membrane walls in the superheater have been designed to operate at the full temperatures expected in a commercial A-USC boiler, but at a lower (intermediate) operating pressure. This superheater has been designed to increase the temperature of the steam supplied by the host utility boiler up to 1400°F (760

  10. Optimal sampling period of the digital control system for the nuclear power plant steam generator water level control

    International Nuclear Information System (INIS)

    Hur, Woo Sung; Seong, Poong Hyun

    1995-01-01

    A great effort has been made to improve the nuclear plant control system by use of digital technologies and a long term schedule for the control system upgrade has been prepared with an aim to implementation in the next generation nuclear plants. In case of digital control system, it is important to decide the sampling period for analysis and design of the system, because the performance and the stability of a digital control system depend on the value of the sampling period of the digital control system. There is, however, currently no systematic method used universally for determining the sampling period of the digital control system. Generally, a traditional way to select the sampling frequency is to use 20 to 30 times the bandwidth of the analog control system which has the same system configuration and parameters as the digital one. In this paper, a new method to select the sampling period is suggested which takes into account of the performance as well as the stability of the digital control system. By use of the Irving's model steam generator, the optimal sampling period of an assumptive digital control system for steam generator level control is estimated and is actually verified in the digital control simulation system for Kori-2 nuclear power plant steam generator level control. Consequently, we conclude the optimal sampling period of the digital control system for Kori-2 nuclear power plant steam generator level control is 1 second for all power ranges. 7 figs., 3 tabs., 8 refs. (Author)

  11. Decentralized power plants. Steam engines in an agriculture cooperative in Paraguay, plant extension in cooperation with the GTZ

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    About 1 cent are the running costs to generate 1 kWh - less than three years is the time for return of investment: tThat are the facts of steam engines using tungfruit shells as a fuel. The more oil prices are rising the more efficiently will such plants work. The way an agricultural cooperative in Paraquay changed their power supply is a good example for varying decentralized power plants - and how to save oil.

  12. One-dimensional simulation for attemperator based on commissioning data of coal-fired steam power plant

    International Nuclear Information System (INIS)

    Cho, Baekhyun; Choi, Geunwon; Uruno, Yumi; Kim, Hyunseo; Chung, Jaewon; Kim, Hyojun; Lee, Kihyun

    2017-01-01

    Highlights: • An attemperator is a device to spray water into the superheated steam. • The evaporation was analyzed using the enthalpy balance from the commissioning data. • The spray atomization and its concurrent evaporation in an attemperator were physically modeled. • A simple one-dimensional simulation was conducted to verify the commissioning results. - Abstract: An attemperator is a device that is used to spray water into the superheated steam between the primary, platen, and final superheaters and the reheat lines. The goal of the attemperator is to control the temperature of the superheated steam in accordance with desired turbine-inlet temperature during both steady-state and transient operation. Because the thermowell installed at the attemperator outlet is tied back to the feedback control of the spray water, the spray water should evaporate ahead of the thermowell for accurate control of the steam temperature. In this work, the completion of the evaporation ahead of the thermowell was analyzed using the enthalpy balance from the start-up commissioning data of an 800-MW coal-fired steam power plant. In addition, the phenomena of the spray atomization and its concurrent evaporation in an attemperator were physically modeled, and a simple one-dimensional simulation was conducted to verify the analysis of the commissioning data.

  13. Check of condition of steam generators, volume compensators and turbine condensers in nuclear power plants

    International Nuclear Information System (INIS)

    Matal, O.; Klinga, J.; Holy, F.; Sobotka, J.

    1989-01-01

    A negative pressure leak detector is described designed for leak testing of tubes in steam generators and steam turbine condensers. The principle, operation and use are described of inflatable bags and an inflatable platform. The bags are designed for insulating and sealing spaces in nuclear reactor components while the inflatable platform is used in pressurizer inspections and repairs. Their properties, and other facilities for detecting leaks in steam generator tubes are briefly described. (M.D.). 3 figs

  14. Heat treatment of large-sized welded rotors of steam turbines for atomic power stations

    Energy Technology Data Exchange (ETDEWEB)

    Kutasov, R F; Mukhina, M P; Tustanovskii, A S

    1977-01-01

    The heat treatment of a welded rotor of grade 25Kh2NMFA steel for steam turbines of nuclear power plants was considered. A following heat treatment schedule was suggested: charging the rotor in to a furnace at 100-150 deg C, heating to 200-250 deg C and holding for 12 hrs; slow heating (10 deg C/h) to 400-450 deg C and holding for 12 hrs; slow heating to 630-640 deg C and holding for 50 hrs, cooling at a rate of 5 deg C/h down to 100 deg C, holding for 20 hrs and cooling with the furnace open. The proposed heat treatment schedule of a duration of 356 hrs ensures a temperature gradient throughout the cross section and the length of the rotor of not more than +-5 deg C, least deviations of geometric dimensions and makes possible machining finish to within 0-0.02 mm. Described are the particularities of the design of a roll-out hearth electric chamber furnace, measuring 13000x5500x5000 mm and built for the purpose of carrying out said heat treatment. The power rating of the furnace is 2850 kW.

  15. Nonlinear Synergetic Governor Controllers for Steam Turbine Generators to Enhance Power System Stability

    Directory of Open Access Journals (Sweden)

    Xingbao Ju

    2017-07-01

    Full Text Available This paper proposes a decentralized nonlinear synergetic governor controller (NSGC for turbine generators to enhance power system stability by using synergetic control theory and the feedback linearization technique. The precise feedback linearization model of a turbine-generator with a steam valve control is obtained, at first, by using a feedback linearization technique. Then based on this model, a manifold is defined as a linear combination of the deviation of the rotor angle, speed deviation, and speed derivative. The control law of the proposed NSGC is deduced and the stability condition of the whole closed-loop system is subsequently analyzed. According to the requirement of the primary frequency regulation, an additional proportional integral (PI controller is designed to dynamically track the steady-state value of the rotor angle. Case studies are undertaken based on a single-machine infinite-bus system and the New England system, respectively. Simulation results show that the proposed NSGC can suppress the power oscillations and improve transient stability more effectively in comparison with the conventional proportional-integral-derivative (PID governor controller. Moreover, the proposed NSGC is robust to the variations of the system operating conditions.

  16. MIT research reactor. Power uprate and utilization

    Energy Technology Data Exchange (ETDEWEB)

    Hu, Lin-Wen [Nuclear Reactor Laboratory, Massachusetts Inst. of Technology, Cambridge, MA (United States)

    2012-03-15

    The MIT Research Reactor (MITR) is a university research reactor located on MIT campus. and has a long history in supporting research and education. Recent accomplishments include a 20% power rate to 6 MW and expanding advanced materials fuel testing program. Another important ongoing initiative is the conversion to high density low enrichment uranium (LEU) monolithic U-Mo fuel, which will consist of a new fuel element design and power increase to 7 MW. (author)

  17. Data communication standards for power utilities

    International Nuclear Information System (INIS)

    Nortoft, P.

    1992-01-01

    In this paper the development of electric utility communication technology during the next decade is addressed. Two main factors are identified: the European Single Market, and the environmental tasks of the nineties. The standardization efforts in Europe are seen as the crank centering this development. some of the standardization efforts reflecting this trend are described

  18. Energy and exergy analysis of the Kalina cycle for use in concentrated solar power plants with direct steam generation

    DEFF Research Database (Denmark)

    Knudsen, Thomas; Clausen, Lasse Røngaard; Haglind, Fredrik

    2014-01-01

    In concentrated solar power plants using direct steam generation, the usage of a thermal storage unit based only on sensible heat may lead to large exergetic losses during charging and discharging, due to a poor matching of the temperature profiles. By the use of the Kalina cycle, in which...... evaporation and condensation takes place over a temperature range, the efficiency of the heat exchange processes can be improved, possibly resulting also in improved overall performance of the system. This paper is aimed at evaluating the prospect of using the Kalina cycle for concentrated solar power plants...... with direct steam generation. The following two scenarios were addressed using energy and exergy analysis: generating power using heat from only the receiver and using only stored heat. For each of these scenarios comparisons were made for mixture concentrations ranging from 0.1 mole fraction of ammonia to 0...

  19. Strategic maintenance plan for Cernavoda steam generators

    International Nuclear Information System (INIS)

    Cicerone, T.; Dhar, D.; VandenBerg, J.P.

    2002-01-01

    Steam generators are among the most important pieces of equipment in a nuclear power plant. They are required full time during the plant operation and obviously no redundancy exists. Past experience has shown that those utilities which implemented comprehensive steam generator inspection and maintenance programs and strict water chemistry controls, have had good steam generator performance that supports good overall plant performance. The purpose of this paper is to discuss a strategic Life Management and Operational-monitoring program for the Cernavoda steam generators. The program is first of all to develop a base of expertise for the management of the steam generator condition; and that is to be supported by a program of actions to be accomplished over time to assess their condition, to take measures to avoid degradation and to provide for inspections, cleaning and modifications as necessary. (author)

  20. Perspective of the Westinghouse steam generator secondary side maintenance approach

    Energy Technology Data Exchange (ETDEWEB)

    Ramaley, D. [Westinghouse Electric Company LLC, Cranberry Township, Pennsylvania (United States)

    2012-07-01

    Historically, Westinghouse had developed a set of steam generator secondary maintenance guidelines focused around performing recurring activities each outage without direct regards to the age, deposit loading, operational status, or corrosion status of the steam generator. Through the evolution of steam generator design and steam generator condition data, Westinghouse now uses a proactive assessment and planning approach for utilities. Westinghouse works with utilities to develop steam generator secondary maintenance plans for long term steam generator viability. Westinghouse has developed a portfolio of products to allow utilities to optimize steam generator operability and develop programs aimed at maintaining the steam generator secondary side in a favorable condition for successful long term operation. Judicious use of the means available for program development should allow for corrosion free operation, long term full power operation at optimum thermal efficiency, and leveling of outage expenditures over a long period of time. This paper will review the following required elements for an effective steam generator secondary side strategy: • Assessment: In order to develop an appropriate maintenance strategy, actions must be taken to obtain an accurate picture of the SG secondary side condition. • Forecasting: Using available data predictions are developed for future steam generator conditions and required maintenance actions. • Action: Cost effective engineering and maintenance actions must be completed at the appropriate time as designated by the plan. • Evaluation of Results: Following execution of maintenance tactics, it is necessary to revise strategy and develop technology enhancements as appropriate. (author)

  1. Status on the Component Models Developed in the Modelica Framework: High-Temperature Steam Electrolysis Plant & Gas Turbine Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Suk Kim, Jong [Idaho National Lab. (INL), Idaho Falls, ID (United States); McKellar, Michael [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bragg-Sitton, Shannon M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Boardman, Richard D. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-10-01

    HTSE process that requires higher temperature input. Simulation results involving several case studies show that the suggested control scheme could maintain the controlled variables (including the steam utilization factor, cathode stream inlet composition, and temperatures of the process streams at various locations) within desired limits under various plant operating conditions. The results also indicate that the proposed HTSE plant could provide operational flexibility to participate in energy management at the utility scale by dynamically optimizing the use of excess plant capacity within an N-R HES. A natural-gas fired GTPP has been proposed as a secondary energy supply to be included in an N-R HES. This auxiliary generator could be used to cover rapid dynamics in grid demand that cannot be met by the remainder of the N-R HES. To evaluate the operability and controllability of the proposed process during transients between load (demand) levels, the dynamic model and control design were developed. Special attention was given to the design of feedback controllers to regulate the power frequency, and exhaust gas and turbine firing temperatures. Several case studies were performed to investigate the system responses to the major disturbance (power load demand) in such a control system. The simulation results show that the performance of the proposed control strategies was satisfactory under each test when the GTPP experienced high rapid variations in the load.

  2. Steam oxidation of TP 347H FG. Laboratory exposures versus service conditions at the power plant

    Energy Technology Data Exchange (ETDEWEB)

    Hansson, Anette N. [DONG Energy A/S, Copenhagen (Denmark); Montgomery, Melanie [DONG Energy A/S, Copenhagen (Denmark); Technical Univ. of Denmark, Lyngby (Denmark). Dept. of Mechanical Engineering; Vattenfall Heat Nordic, Copenhagen (Denmark)

    2010-07-01

    TP347H FG is often used as final superheater tubing at Danish Power Plants. The oxidation behaviour of TP347H FG in steam was investigated both in laboratory conditions and field conditions. Short time exposures (336 hours) were performed in the laboratory at 500, 600 and 700 C in gasses with 8 or 46% H{sub 2}O and varying oxygen partial pressures. The shortest exposure time at the power plant was 7720 h, the temperature varied between 500 and 650 C. Surprisingly, thicker oxide layers formed within the laboratory facility at 600 and 700 C than during the long time exposures at the power plant. This could not be explained by spallation. Double-layered oxides developed during oxidation. The outer layer consist of Fe-oxides and the inner oxide contained Fe and the remaining alloy elements. Investigations with scanning electron microscopy (SEM) revealed that the morphology of the inner oxide was different for the two types of exposures. However, investigation using transmission electron microscopy (TEM) showed that the inner oxide in both cases consisted of particles of Fe-Mn-Cr spinel embedded in a metallic Fe-Ni matrix in the bulk of the (former) alloy grains and Cr-rich oxide layer along the (former) alloy grain boundaries. The main difference between the layers formed at the two locations is that the Cr-rich oxide layer is thicker for the samples exposed at the power plant than that for the samples exposed at the laboratory conditions. Furthermore, the depth of Cr depletion in the alloy adjacent the oxide layer is greater for the samples exposed at the power plant compared to those exposed in the laboratory. The microstructure investigation suggests that the slower oxidation rate of TP347H FG at the power plant as compared to the laboratory is due to a larger reservoir of Cr for the samples exposed at the power plant probably combined with a higher mobility of Cr within the alloy. (orig.)

  3. Temperature conditions in an LMFBR power plant from primary sodium to steam circuits

    International Nuclear Information System (INIS)

    Aubert, M.; Chaumont, J.M.; Mougniot, J.C.; Recolin, J.; Acket.

    1977-01-01

    The optimization analysis which is presented is based on an evaluation of the tender prior to contracting Super Phenix. Process constraints are reviewed: fuel limitations, turbine, steam generators; parameter selection involves major temperatures (primary ΔT 0 , steam generator water inlet temperature, turbine steam inlet temperature) or minor temperature (secondary sodium); countervailing mechanisms include upward and downward tendencies. The optimum values obtained by the method represent a coherent balanced set of parameters. So, the most significant tendency revealed by an optimization of investment costs involves the advantages of a hot system with a steam temperature above 515 0 C, but the hot temperature range is very limited (3 0 C between the hot primary sodium temperature and the steam temperature) while the cold temperatures cover a much wide range. The tolerance range within which each critical temperature may be selected without exceeding a certain cost margin per KWh is given

  4. Wear behavior of steam generator tubes in nuclear power plant operating condition

    International Nuclear Information System (INIS)

    Kim, In-Sup; Hong, Jin-Ki; Kim, Hyung-Nam; Jang, Ki-Sang

    2003-01-01

    Reciprocating sliding wear tests were performed on steam generator tubes materials at steam generator operating temperature. The material surfaces react with oxygen to form oxides. The oxide properties such as formation rate and mechanical properties are varied with the test temperature and alloy composition. So, it is important to investigate the wear properties of each steam generator tube materials in steam generator operating condition. The tests results indicated that the wear coefficient in work rate model of alloy 690 was faster than that of alloy 800. From the scanning electron microscopy observation, the wear scars were similar each other and worn surfaces were covered with oxide layers. It seemed that the oxide layers were formed by wear debris sintering or cold welding and these layer properties affected the wear rate of steam generator tube materials. (author)

  5. Feasability of the direct generation of hydrogen for fuel-cell-powered vehicles by on-board steam reforming of naphta

    NARCIS (Netherlands)

    Darwish, Naif A.; Hilal, Nidal; Versteeg, Geert; Heesink, Albertus B.M.

    2004-01-01

    A process flow sheet for the production of hydrogen to run a 50 kW fuel-cell-powered-vehicle by steam reforming of naphtha is presented. The major units in the flow sheet involve a desulfurization unit, a steam reformer, a low temperature (LT) shift reactor, a methanation reactor, and a membrane

  6. Feasibility of the direct generation of hydrogen for fuel-cell-powered vehicles by on-board steam reforming of naphtha

    NARCIS (Netherlands)

    Darwish, Naif A.; Hilal, Nidal; Versteeg, Geert; Heesink, Bert

    2004-01-01

    A process flow sheet for the production of hydrogen to run a 50 kW fuel-cell-powered-vehicle by steam reforming of naphtha is presented. The major units in the flow sheet involve a desulfurization unit, a steam reformer, a low temperature (LT) shift reactor, a methanation reactor, and a membrane

  7. A State-of-the-Art Report on Technologies of Volume Reduction and Self-Disposal for Large Metal Wastes including the Steam Generator of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Kune Woo; Choi, W. K.; Kim, G. Y.

    2009-06-01

    This report focuses on technologies of volume reduction and self-disposal for large metal wastes including the steam generator of nuclear power plants. This report consists of the cases of treatments and foreign and domestic technologies for steam generator replacement

  8. Development of High-Powered Steam Turbines by OAO NPO Central Research and Design Institute for Boilers and Turbines

    Science.gov (United States)

    Mikhailov, V. E.; Khomenok, L. A.; Kovalev, I. A.

    2018-01-01

    The article provides an overview of the developments by OAO NPO TsKTI aimed at improvement of components and assemblies of new-generation turbine plants for ultra-supercritical steam parameters to be installed at the power-generating facilities in service. The list of the assemblies under development includes cylinder shells, the cylinder's flow paths and rotors, seals, bearings, and rotor cooling systems. The authors consider variants of the shafting-cylinder configurations for which advanced high-pressure and intermediate-pressure cylinders with reactive blading and low-pressure cylinders of conventional design and with counter-current steam flows are proposed and high-pressure rotors, which can increase the economic efficiency and reduce the overall turbine plant dimensions. Materials intended for the equipment components that operate at high temperatures and a steam cooling technique that allows the use of cheaper steel grades owing to the reduction in the metal's working temperature are proposed. A new promising material for the bearing surfaces is described that enables the operation at higher unit pressures. The material was tested on a full-scale test bench at OAO NPO TsKTI and a turbine in operation. Ways of controlling the erosion of the blades in the moisture-steam turbine compartments by the steam heating of the hollow guide blades are considered. To ensure the dynamic stability of the shafting, shroud and diaphragm seals that prevent the development of the destabilizing circulatory forces of the steam flow were devised and trialed. Advanced instrumentation and software are proposed to monitor the condition of the blading and thermal stresses under transient conditions, to diagnose the vibration processes, and to archive the obtained data. Attention is paid to the normalization of the electromagnetic state of the plant in order to prevent the electrolytic erosion of the plant components. The instrumentation intended for monitoring the relevant electric

  9. Impact of a 1,000-foot thermal mixing zone on the steam electric power industry

    International Nuclear Information System (INIS)

    Veil, J.A.

    1994-04-01

    Thermal discharge requirements for power plants using once-through cooling systems are based on state water quality standards for temperatures that must be met outside of designated mixing zones. This study evaluates the impact of limiting the extent of thermal mixing zones. This study evaluates the impact of limiting the extent of thermal mixing zones to no more than 1,000 feet from the discharge point. Data were collected from 79 steam electric plants. Of the plants currently using once-through cooling systems, 74% could not meet current thermal standards at the edge of a 1,000-foot mixing zone. Of this total, 68% would retrofit cooling towers, and 6% would retrofit diffusers. The estimated nationwide capital cost for retrofitting plants that could not meet current thermal standards at the edge of a 1,000-foot mixing zone is $21.4 billion. Conversion of a plant from once-through cooling to cooling towers or addition of diffusers would result in a lower energy output from that plant. For the affected plants, the total estimated replacement cost would be $370 to $590 million per year. Some power companies would have to construct new generating capacity to meet the increased energy demand. The estimated nationwide cost of this additional capacity would be $1.2 to $4.8 billion. In addition to the direct costs associated with compliance with a 1,000-foot mixing zone limit, other secondary environmental impacts would also occur. Generation of the additional power needed would increase carbon dioxide emissions by an estimated 8.3 million tons per year. In addition, conversion from once-through cooling systems to cooling towers at affected plants would result in increased evaporation of about 2.7 million gallons of water per minute nationwide

  10. Quantitative indexes of gas-steam thermo electrical power plants thermodynamical cycles; Indices quantitativos de ciclos termodinamicos de centrais termoeletricas de gas-vapor

    Energy Technology Data Exchange (ETDEWEB)

    Vlassov, D.; Vargas, J.V.C. [Parana Univ., Curitiba, PR (Brazil). Dept. de Engenharia Mecanica]. E-mails: vlassov@demec.ufpr.br; jvargas@demec.ufpr.br

    2002-07-01

    This paper analyses various thermal schemes of the world wide most used cycles in gas-steam thermoelectric power plants. The combination of gas turbine cycle with the steam-gas cycle in thermoelectric power plants is performed in several ways, resulting in different thermal schemes, used equipment and operation plant basic characteristics. The thermal scheme of a gas-steam power plant is a determinant factor for the definition of energetic, economic and ecological characteristics. For the comparative analysis various quantitative indexes are presented, as for example: the heat fraction supplied to the gas turbine cycle and the cycle binary rate.

  11. Experimental and numerical investigation of the flow measurement method utilized in the steam generator of HTR-PM

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Shiming; Ren, Cheng; Sun, Yangfei [Institute of Nuclear and New Energy Technology of Tsinghua University, Collaborative Innovation Center of Advanced Nuclear Energy Technology, Key Laboratory of Advanced Reactor Engineering and Safety of Ministry of Education, Beijing 100084 (China); Tu, Jiyuan [Institute of Nuclear and New Energy Technology of Tsinghua University, Collaborative Innovation Center of Advanced Nuclear Energy Technology, Key Laboratory of Advanced Reactor Engineering and Safety of Ministry of Education, Beijing 100084 (China); School of Aerospace, Mechanical & Manufacturing Engineering, RMIT University, Melbourne, VIC 3083 (Australia); Yang, Xingtuan, E-mail: yangxt107@sina.com [Institute of Nuclear and New Energy Technology of Tsinghua University, Collaborative Innovation Center of Advanced Nuclear Energy Technology, Key Laboratory of Advanced Reactor Engineering and Safety of Ministry of Education, Beijing 100084 (China)

    2016-08-15

    Highlights: • The flow confluence process in the steam generator is very important for HTR-PM. • The complicated flow in the unique pipeline configuration is studied by both of experimental and numerical method. • The pressure uniformity at the bottom of the model was tested to evaluate the accuracy of the experimental results. • Flow separation and the secondary flow is described for explaining the nonuniformity of the flow distribution. - Abstract: The helium flow measurement method is very important for the design of HTR-PM. Water experiments and numerical simulation with a 1/5 scaled model are conducted to investigate the flow measurement method utilized in the steam generator of HTR-PM. Pressure information at specific location of the 90° elbows with the diameter of 46.75 mm and radius ratio of 1.5 is measured to evaluate the flow rate in the riser-pipes. Pressure uniformity at the bottom of the experimental apparatus is tested to evaluate the influence of the equipment error on the final experimental results. Numerical results obtained by using the realizable k–ε model are compared with the experimental data. The results reveal that flow oscillation does not occur in the confluence system. For every single riser-pipe, the flow is stable despite the nonuniformity of the flow distribution. The average flow rates of the two pipe series show good repeatability regardless of the increases and decreases of the average velocity. In the header box, the flows out of the riser-pipes encounter with each other and finally distort the pressure distribution and the nonuniformity of the flow distribution becomes more significant along with the increasing Reynolds number.

  12. District heating and cooling systems for communities through power-plant retrofit and distribution network. Volume 2. Tasks 1-3. Final report. [Downtown Toledo steam system

    Energy Technology Data Exchange (ETDEWEB)

    Watt, J.R.; Sommerfield, G.A.

    1979-08-01

    Each of the tasks is described separately: Task 1 - Demonstration Team; Task 2 - Identify Thermal Energy Source(s) and Potential Service Area(s); and Task 3 - Energy Market Analysis. The purpose of the project is to establish and implement measures in the downtown Toledo steam system for conserving scarce fuel supplies through cogeneration, by retrofit of existing base- or intermediate-loaded electric-generating plants to provide for central heating and cooling systems, with the ultimate purpose of applying the results to other communities. For Task 1, Toledo Edison Company has organized a Demonstration Team (Battelle Columbus Laboratories; Stone and Webster; Ohio Dept. of Energy; Public Utilities Commission of Ohio; Toledo Metropolitan Area Council of Governments; and Toledo Edison) that it hopes has the expertise to evaluate the technical, legal, economic, and marketing issues related to the utilization of by-product heat from power generation to supply district heating and cooling services. Task 2 gives a complete technical description of the candidate plant(s), its thermodynamic cycle, role in load dispatch, ownership, and location. It is concluded that the Toledo steam distribution system can be the starting point for developing a new district-heating system to serve an expanding market. Battelle is a member of the team employed as a subcontractor to complete the energy market analysis. The work is summarized in Task 3. (MCW)

  13. Development of integral type forgings for steam generator of nuclear power plant

    International Nuclear Information System (INIS)

    Suzuki, Komei; Sato, Ikuo; Murai, Etsuo

    1992-01-01

    The use of integral type steel forgings for the construction of pressure vessel enhances the structural integrity of components and makes the fabrication of components and the execution of in-service inspection (ISI) easier than those fabrication from plate and casting materials. Such steel forgings have been realized for steam generator (SG) for nuclear power plant as follows : (1) Forged shell ring : change from welding fabrication of formed plates to forging ; (2) Forged conical shell ring : ditto ; (3) Forged head integral with nozzles (s) : (i) Primary head : change from casting to forging ; (ii) Secondary head : change from welding fabrication of formed plates to forging. These steel forgings have been realized by recent development in manufacturing technologies, such as steel making, forging processes and heat treatment which are vital to the quality of steel forgings. Some examples of recent typical high quality steel forgings developed by the Japan Steel Works, Ltd. (JSW) are introduced, and the main points of the manufacturing technique and the quality attained are also described. (author)

  14. Prediction of crack coalescence of steam generator tubes in nuclear power plants

    International Nuclear Information System (INIS)

    Abou-Hanna, Jeries; McGreevy, Timothy E.; Majumdar, Saurin

    2004-01-01

    Prediction of failure pressures of cracked steam generator tubes of nuclear power plants is an important ingredient in scheduling inspection and repair of tubes. Prediction is usually based on nondestructive evaluation (NDE) of cracks. NDE often reveals two neighboring cracks. If the cracks interact, the tube pressure under which the ligament between the two cracks fails could be much lower than the critical burst pressure of an individual equivalent crack. The ability to accurately predict the ligament failure pressure, called ''coalescence pressure,'' is important. The failure criterion was established by nonlinear finite element model (FEM) analyses of coalescence of two 100% through-wall collinear cracks. The ligament failure is precipitated by local instability of the ligament under plane strain conditions. As a result of this local instability, the ligament thickness in the radial direction decreases abruptly with pressure. Good correlation of FEM analysis results with experimental data obtained at Argonne National Laboratory's Energy Technology Division demonstrated that nonlinear FEM analyses are capable of predicting the coalescence pressure accurately for 100% through-wall cracks. This failure criterion and FEA work have been extended to axial cracks of varying ligament width, crack length, and cases where cracks are offset by axial or circumferential ligaments

  15. Monitoring device for radioactive leakage from steam system in nuclear power plant

    International Nuclear Information System (INIS)

    Ogawa, Tateo; Sato, Kohei

    1988-01-01

    Purpose: To improve the reliability for the monitor of radio-active leakage by accumulating small quantity of radioactivities each lower than the detectable level and increasing their dose rate. Constitution: Even if the steam system radiation monitor in the nuclear power plant is disposed for the detection of in-leak radioactivity, radioactive leakage can be monitored at high reliability by increasing the small quantity of radioactivities in the drains to a detectable sensitivity range of the monitor upon detection. In view of the above, in the present invention, radioactive material catching medium is incorporated to a radio-activity monitor spool piece for accumulating small quantity of radioactivities. Specifically as the catching medium, an ion exchange resin is used for the leakage of ionic radioactive material, while an ion exchange resin increased with the mixing ratio of a cationic resin or hollow thread membrane filter is used for crud-like radioactive material leakage. These catching media are incorporated into the spool piece, thereby enabling to catch even small quantity of radioactive leakage lower than the detectable sensitivity of the radiation monitor, if should occur, in the spool piece and enabling radioactive detection for the accumulated dose rate. (Horiuchi, T.)

  16. Passive residual energy utilization system in thermal cycles on water-cooled power reactors

    International Nuclear Information System (INIS)

    Placco, Guilherme M.; Guimaraes, Lamartine N.F.; Santos, Rubens S. dos

    2013-01-01

    This work presents a concept of a residual energy utilization in nuclear plants thermal cycles. After taking notice of the causes of the Fukushima nuclear plant accident, an idea arose to adapt a passive thermal circuit as part of the ECCS (Emergency Core Cooling System). One of the research topics of IEAv (Institute for Advanced Studies), as part of the heat conversion of a space nuclear power system is a passive multi fluid turbine. One of the main characteristics of this device is its passive capability of staying inert and be brought to power at moments notice. During the first experiments and testing of this passive device, it became clear that any small amount of gas flow would generate power. Given that in the first stages of the Fukushima accident and even during the whole event there was plenty availability of steam flow that would be the proper condition to make the proposed system to work. This system starts in case of failure of the ECCS, including loss of site power, loss of diesel generators and loss of the battery power. This system does not requires electricity to run and will work with bleed steam. It will generate enough power to supply the plant safety system avoiding overheating of the reactor core produced by the decay heat. This passive system uses a modified Tesla type turbine. With the tests conducted until now, it is possible to ensure that the operation of this new turbine in a thermal cycle is very satisfactory and it performs as expected. (author)

  17. Hydroelectric power utilization of the River Crna Reka

    International Nuclear Information System (INIS)

    Ivanova-Davidovikj, Jasna

    2001-01-01

    In the paper several feasibility studies for rational use of the Macedonian River Crna Reka, developed by foreign companies are analysed. The utilization of the hydro-power potential of the River Crna Reka is predicted to be by realization of two hydroelectric power plants with total capacity of 450 MW, as well as annual electric power generation of 600 GWh. This two HPPs will facilitate the development of the Macedonian electric power system

  18. Development of technologies on innovative-simplified nuclear power plant using high-efficiency steam injectors (5) operating characteristics of center water jet type supersonic steam injector

    International Nuclear Information System (INIS)

    Abe, Y.; Kawamoto, Y.; Iwaki, C.; Narabayashi, T.; Mori, M.; Ohmori, S.

    2005-01-01

    Next-generation reactor systems have been under development aiming at simplified system and improvement of safety and credibility. A steam injector has a function of a passive pump without large motor or turbo-machinery, and has been investigated as one of the most important component of the next-generation reactor. Its performance as a pump depends on direct contact condensation phenomena between a supersonic steam and a sub-cooled water jet. As previous studies of the steam injector, there are studies about formulation of operating characteristic of steam injector and analysis of jet structure in steam injector by Narabayashi etc. And as previous studies of the direct contact condensation, there is the study about the direct contact condensation in steam atmosphere. However the study about the turbulent heat transfer under the great shear stress is not enough investigated. Therefore it is necessary to examine in detail about the operating characteristic of the steam injector. The present paper reports the observation results of the water jet behavior in the super sonic steam injector by using the video camera and the high-speed video camera. And the measuring results of the temperature and the pressure distribution in the steam injector are reported. From observation results by video camera, it is cleared that the water jet is established at the center of the steam injector right after steam supplied and the operation of the steam injector depends on the throat diameter. And from observation results by high-speed video camera, it is supposed that the columned water jet surface is established in the mixing nozzle and the water jet surface movement exists. And from temperature measuring results, it is supposed that the steam temperature at the mixing nozzle is changed between about 80 degree centigrade and about 60 degree centigrade. Then from the pressure measuring results, it is confirmed that the pressure at the diffuser depends on each the throat diameter and

  19. A study on reliability of electro-hydraulic governor control system for large steam turbine in power plant

    International Nuclear Information System (INIS)

    Kang, Gu Hwa; Lee, Tae Hoon; Moon, Seung Jae; Lee, Jae Heon; Yoo, Ho Seon

    2008-01-01

    In this work, the right management procedure for hydraulic power oil will be discussed and suggested. A thermal power plant turbine should respond to the change of load status. However, to satisfy the frequency of alternating current, the revolution per minute should be kept constant. Therefore, by controlling the flow rate of the steam to the turbine, the governor satisfies the load variation without alternating the revolution per minutes of the turbine. To protect the governor, the hydraulic power unit should be managed carefully by controlling the quality and the flow rate of the oil

  20. A Comparison of Organic and Steam Rankine Cycle Power Systems for Waste Heat Recovery on Large Ships

    DEFF Research Database (Denmark)

    Andreasen, Jesper Graa; Meroni, Andrea; Haglind, Fredrik

    2017-01-01

    %) fuel case. The processes were compared based on their off-design performance for diesel engine loads in the range between 25% and 100%. The fluids considered in the organic Rankine cycle process were MM(hexamethyldisiloxane), toluene, n-pentane, i-pentane and c-pentane. The results of the comparison....... The net power production from the waste heat recovery units is generally higher for the low-sulfur fuel case. The steam Rankine cycle unit produces 18% more power at design compared to the high-sulfur fuel case, while the organic Rankine cycle unit using MM produces 33% more power....

  1. Analysis of oxy-fuel combustion power cycle utilizing a pressurized coal combustor

    International Nuclear Information System (INIS)

    Hong, Jongsup; Chaudhry, Gunaranjan; Brisson, J.G.; Field, Randall; Gazzino, Marco; Ghoniem, Ahmed F.

    2009-01-01

    Growing concerns over greenhouse gas emissions have driven extensive research into new power generation cycles that enable carbon dioxide capture and sequestration. In this regard, oxy-fuel combustion is a promising new technology in which fuels are burned in an environment of oxygen and recycled combustion gases. In this paper, an oxy-fuel combustion power cycle that utilizes a pressurized coal combustor is analyzed. We show that this approach recovers more thermal energy from the flue gases because the elevated flue gas pressure raises the dew point and the available latent enthalpy in the flue gases. The high-pressure water-condensing flue gas thermal energy recovery system reduces steam bleeding which is typically used in conventional steam cycles and enables the cycle to achieve higher efficiency. The pressurized combustion process provides the purification and compression unit with a concentrated carbon dioxide stream. For the purpose of our analysis, a flue gas purification and compression process including de-SO x , de-NO x , and low temperature flash unit is examined. We compare a case in which the combustor operates at 1.1 bars with a base case in which the combustor operates at 10 bars. Results show nearly 3% point increase in the net efficiency for the latter case.

  2. Analysis of heat balance on innovative-simplified nuclear power plant using multi-stage steam injectors

    International Nuclear Information System (INIS)

    Goto, Shoji; Ohmori, Shuichi; Mori, Michitsugu

    2006-01-01

    The total space and weight of the feedwater heaters in a nuclear power plant (NPP) can be reduced by replacing low-pressure feedwater heaters with high-efficiency steam injectors (SIs). The SI works as a direct heat exchanger between feedwater from condensers and steam extracted from turbines. It can attain pressures higher than the supplied steam pressure. The maintenance cost is lower than that of the current feedwater heater because of its simplified system without movable parts. In this paper, we explain the observed mechanisms of the SI experimentally and the analysis of the computational fluid dynamics (CFD). We then describe mainly the analysis of the heat balance and plant efficiency of the innovative-simplified NPP, which adapted to the boiling water reactor (BWR) with the high-efficiency SI. The plant efficiencies of this innovative-simplified BWR with SI are compared with those of a 1 100 MWe-class BWR. The SI model is adopted in the heat balance simulator as a simplified model. The results show that the plant efficiencies of the innovate-simplified BWR with SI are almost equal to those of the original BWR. They show that the plant efficiency would be slightly higher if the low-pressure steam, which is extracted from the low-pressure turbine, is used because the first-stage of the SI uses very low pressure. (author)

  3. Boiler and steam generator corrosion: Nuclear power plants. (Latest citations from the NTIS Bibliographic database). Published Search

    International Nuclear Information System (INIS)

    1993-09-01

    The bibliography contains citations concerning corrosion effects, mechanisms, detection, and inhibition in nuclear powered steam generators. Pitting, stress corrosion cracking, and crevice corrosion studies performed on the water side and hot gas side of the heat exchanger tubes and support structures are presented. Water treatment, corrosion monitoring, chemical cleaning, and descaling methods are considered. Fossil fuel fired boilers are examined in a separate bibliography. (Contains a minimum of 138 citations and includes a subject term index and title list.)

  4. Pressure waves transient occurred in the steam generators feedwater lines of the Atucha-1 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Balino, J.L.; Carrica, P.M.; Larreteguy, A.E.

    1993-01-01

    The pressure transient occurred at Atucha I Nuclear Power Plant in March 1990 is simulated. The transient was due to the fast closure of a flow control valve at the steam generators feedwater lines. The system was modelled, including the actuation of the relief valves. The minimum closure time for no actuation of the relief valves and the evolution of the velocity and piezo metric head for different cases were calculated. (author)

  5. Utilities' view on the fuel management of nuclear power plants

    International Nuclear Information System (INIS)

    Held, C.; Moraw, G.; Schneeberger, M.; Szeless, A.

    1977-01-01

    Utilities engagement in nuclear power requires an increasing amount of fuel management activities by the utilities in order to meet all tasks involved. These activities comprise essentially two main areas: - activities to secure the procurement of all steps of the fuel cycle from the head to the back end; - activities related to the incore fuel managment. A general survey of the different steps of the nuclear fuel cycle is presented together with the related activities and responsibilities which have to be realized by the utilities. Starting in the past, today's increasing utility involvement in the nuclear fuel management is shown, as well as future fuel management trends. The scope of utilities' fuel management activities is analyzed with respect to organizational aspects, technical aspects, safeguarding aspects, and financial aspects. Utilities taking active part in the fuel management serves to achieve high availability and flexibility of the nuclear power plant during the whole plant life as well as safe waste isolation. This can be assured by continuous optimization of all fuel management aspects of the power plant or on a larger scale of a power plant system, i.e., utility activities to minimize the effects of fuel cycle on the environment, which includes optimization of fuel behaviour, radiation exposure to public and personnel, and utility technical and economic evaluations of out- and incore fuel management. These activities of nuclear power producing utilities in the field of nuclear fuel cycle are together with a close cooperation with fuel industry as well as national and international authorities a necessary basis for the further utilization of nuclear power

  6. Issues related to gas use by European power utilities

    International Nuclear Information System (INIS)

    Jonchere, J.P.

    1992-01-01

    Gas-fired combined cycle frequently appears as a least-cost option for newly built power plants. Moreover, this option also brings obvious environmental benefits. But, power utilities, facing unavoidable long term uncertainties about electricity demand are not at ease with long term commitments such a a take-or-pay formula or a price indexation not reflecting the market place in the power generation industry. Due to the flexibilities in the management of existing power plants (deferred closures, etc...) or even on the demand side (load shifting, peak clipping, etc...), early decision making is not compulsory. Therefore, a gas breakthrough in the power sector interfuel competition will require a mutual understanding of constraints and flexibilities faced by partners: gas sellers and power utilities. A fair rent sharing between them would certainly be a prerequisite to a large but possibly temporary access of natural gas to the European power sector. 4 refs., 1 fig., 2 tabs

  7. Deregulation of the electric utility industry - implications for nuclear power

    International Nuclear Information System (INIS)

    Fern, A.Rose

    2000-01-01

    The deregulation movement sweeping the international electric utility community represents a dramatic shift om the traditional business model of utilities. This paper will focus on deregulation in thc United States and the new challenges for nuclear power plant operators. An overview of the new operating models being implemented in the US will lead into a discussion on new economic and operating concerns for nuclear power plant operators. (author)

  8. Deregulation of the electric utility industry - implications for nuclear power

    International Nuclear Information System (INIS)

    Fern, A.R.

    2001-01-01

    The deregulation movement sweeping the international electric utility community represents a dramatic shift from the traditional utility business model. This paper will focus on deregulation in the United States and the new challenges for nuclear power plant operators. An overview of the new operating models being implemented in the US will lead into a discussion on new economic and operating concerns for nuclear power plant operators. (author)

  9. Critical review of use of high pressure saturated steam turbine economizers in nuclear power plants

    International Nuclear Information System (INIS)

    Urbanek, J.

    1981-01-01

    In the high-pressure part of the turbine drops of moisture condensate, which causes erosion and has negative impact on the service-life of the turbine and on its thermodynamic efficiency. Various designs have been put forward to eliminate moisture. A good combination is moisture separation combined with the offtake of steam for the regeneration of feed water or for the steam re-heater. As concerns the high-pressure component of the turbine it is best to offtake steam for the feed water heater and for heating the steam between the high- and low-pressure components of the turbine. The connections of the heater and re-heater in diagrams of various manufacturers are evaluated and compared. It appears to be uneconomical to use the heater in cases where feed water would be heated to temperature considerably below its optimal value. (M.D.)

  10. Modeling of steam generator in nuclear power plant using neural network ensemble

    International Nuclear Information System (INIS)

    Lee, S. K.; Lee, E. C.; Jang, J. W.

    2003-01-01

    Neural network is now being used in modeling the steam generator is known to be difficult due to the reverse dynamics. However, Neural network is prone to the problem of overfitting. This paper investigates the use of neural network combining methods to model steam generator water level and compares with single neural network. The results show that neural network ensemble is effective tool which can offer improved generalization, lower dependence of the training set and reduced training time

  11. Power Dependence in Individual Bargaining: The Expected Utility of Influence.

    Science.gov (United States)

    Lawler, Edward J.; Bacharach, Samuel B.

    1979-01-01

    This study uses power-dependence theory as a framework for examining whether and how parties use information on each other's dependence to estimate the utility of an influence attempt. The effect of dependence in expected utilities is investigated (by role playing) in bargaining between employer and employee for a pay raise. (MF)

  12. Determination of moisture content in steams and variation in moisture content with operating boiler level by analyzing sodium content in steam generator water and steam condensate of a nuclear power plant using ion chromatographic technique

    International Nuclear Information System (INIS)

    Pal, P.K.; Bohra, R.C.

    2015-01-01

    Dry steam with moisture content less than <1% is the stringent requirements in a steam generator for good health of the turbine. In order to confirm the same, determination of sodium is done in steam generator water and steam condensate using Flame photometer in ppm level and ion chromatograph in ppb level. Depending on the carry over of sodium in steam along with the water droplet (moisture), the moisture content in steam was calculated and was found to be < 1% which is requirements of the system. The paper described the salient features of a PHWR, principle of Ion Chromatography, chemistry parameters of Steam Generators and calculation of moisture content in steam on the basis of sodium analysis. (author)

  13. Minimize corrosion degradation of steam generator tube materials

    International Nuclear Information System (INIS)

    Lu, Y.

    2006-01-01

    As part of a coordinated program, AECL is developing a set of tools to aid with the prediction and management of steam generator performance. Although stress corrosion cracking (of Alloy 800) has not been detected in any operating steam generator, for life management it is necessary to develop mechanistic models to predict the conditions under which stress corrosion cracking is plausible. Experimental data suggest that all steam generator tube materials are susceptible to corrosion degradation under some specific off-specification conditions. The tolerance to the chemistry upset for each steam generator tube alloy is different. Electrochemical corrosion behaviors of major steam generator tube alloys were studied under the plausible aggressive crevice chemistry conditions. The potential hazardous conditions leading to steam generator tube degradation and the conditions, which can minimize steam generator tube degradation have been determined. Recommended electrochemical corrosion potential/pH zones were defined for all major steam generator tube materials, including Alloys 600, 800, 690 and 400, under CANDU steam generator operating and startup conditions. Stress corrosion cracking tests and accelerated corrosion tests were carried out to verify and revise the recommended electrochemical corrosion potential/pH zones. Based on this information, utilities can prevent steam generator material degradation surprises by appropriate steam generator water chemistry management and increase the reliability of nuclear power generating stations. (author)

  14. Utilization of excess wind power in electric vehicles

    International Nuclear Information System (INIS)

    Hennings, Wilfried; Mischinger, Stefan; Linssen, Jochen

    2013-01-01

    This article describes the assessment of future wind power utilization for charging electric vehicles (EVs) in Germany. The potential wind power production in the model years 2020 and 2030 is derived by extrapolating onshore wind power generation and offshore wind speeds measured in 2007 and 2010 to the installed onshore and offshore wind turbine capacities assumed for 2020 and 2030. The energy consumption of an assumed fleet of 1 million EVs in 2020 and 6 million in 2030 is assessed using detailed models of electric vehicles, real world driving cycles and car usage. It is shown that a substantial part of the charging demand of EVs can be met by otherwise unused wind power, depending on the amount of conventional power required for stabilizing the grid. The utilization of wind power is limited by the charging demand of the cars and the bottlenecks in the transmission grid. -- Highlights: •Wind power available for charging depends on minimum required conventional power (must-run). •With 20 GW must-run power, 50% of charging can be met by excess wind power. •Grid bottlenecks decrease charging met by wind power from 50 % to 30 %. •With zero must-run power, only very little wind power is available for charging

  15. Energy and economic optimization of a membrane-based oxyfuel steam power plant; Energetische und wirtschaftliche Optimierung eines membranbasierten Oxyfuel-Dampfkraftwerkes

    Energy Technology Data Exchange (ETDEWEB)

    Nazarko, Yevgeniy

    2015-07-01

    Carbon capture and storage is one technological option for reducing CO{sub 2} emissions. The oxyfuel process is based on the combustion of fossil fuels in an oxygen-flue gas atmosphere with the subsequent concentration of CO{sub 2}. The oxygen is produced by cryogenic air separation with an energy demand of 245 kWh{sub el}/t{sub O2}. The application of ceramic membranes has the potential to reduce the specific energy demand of oxygen supply with consistently high-purity oxygen. This work focuses on - determining the efficiency of an advanced oxyfuel steam power plant that can be constructed today using membranes for oxygen production, - investigating and quantifying the potential for energy optimizing the overall process by changing its flow structure, - assessing the feasibility of individual optimization options based on their investment costs under market conditions. For this work, a method developed by Forschungszentrum Juelich and patented on 25 April 2012 under EP 2214806 is used. The Oxy-Vac-Juel concept is integrated into the oxyfuel steam power plant with simple process management using standardized power plant components. The net efficiency of the base power plant is 36.6 percentage points for an oxygen separation degree of 60 %. This corresponds to a net power loss of 9.3 percentage points compared to the reference power plant without CO{sub 2} capture. The specific electricity demand of this oxygen supply method is 176 kWh{sub el}/t{sub O2}. To increase the efficiency, the flow structure of the base power plant is optimized using industrially available components from power plant and process engineering. The 22 analyzed optimization options consist of design optimization of the gas separation process, the modification of the flue gas recirculation and the plant-internal waste heat utilization. The energetic advantage over the base power plant, depending on the optimization option, ranges from 0.05 - 1.00 percentage points. For each optimization option

  16. Optimization for set-points and robust model predictive control for steam generator in nuclear power plants

    International Nuclear Information System (INIS)

    Osgouee, Ahmad

    2010-01-01

    Full Text: Nuclear power plants will be needed for future energy demands, which are expected to grow at different rates around the world. Lower operating cost is one of the major benefits of nuclear power plants over fossil power plants. Also, the plant availability is a key factor to economic index of a nuclear power plant. The opportunities for building new nuclear power plants around the world will depend on the need for clean energy with zero, or minimal emissions to support healthy communities, supply reliable energy with stable prices, and issues related to global warming and climate change. Compared to other types of power plants, nuclear power plants are preferred for their numerous advantages, including low operating costs, emission free operation with no smog, no acid rain, and no effect on global warming. Economic feasibility of a nuclear power plant requires for smooth and uninterrupted plant operation during electrical power demand variations. The steam generator (SG) in a nuclear power plant plays an important role in cooling of the reactor, balancing energy between reactor and turbine and producing steam for the turbine-generators. SG acts as an additional safety barrier between the nuclear reactor and the outside world also. As a result, control of the water inventory in the SG is very important to ensure continuous cooling of the nuclear reactor core, plant protection and at the same time, to prevent the SG tubes and turbine blades failure. A review of past nuclear power plant operation experiences indicates that unplanned reactor trips due to steam generator level (SGL) control have been significant contributors to plant unavailability. During low power operation, the level control is complicated by the thermal reverse effects known as 'shrink and swell'. Manual operator intervention to the SGL control system at low reactor power and to the unit upset conditions has been identified as an operator response in most nuclear power plants. In spite of

  17. Modelling and exergoeconomic-environmental analysis of combined cycle power generation system using flameless burner for steam generation

    International Nuclear Information System (INIS)

    Hosseini, Seyed Ehsan; Barzegaravval, Hasan; Ganjehkaviri, Abdolsaeid; Wahid, Mazlan Abdul; Mohd Jaafar, M.N.

    2017-01-01

    Highlights: • Using flameless burner as a supplementary firing system after gas turbine is modeled. • Thermodynamic, economic and environmental analyses of this model are performed. • Efficiency of the plant increases about 6% and CO_2 emission decreases up to 5.63% in this design. • Available exergy for work production in both gas cycle and steam cycle increases in this model. - Abstract: To have an optimum condition for the performance of a combined cycle power generation, using supplementary firing system after gas turbine was investigated by various researchers. Since the temperature of turbine exhaust is higher than auto-ignition temperature of the fuel in optimum condition, using flameless burner is modelled in this paper. Flameless burner is installed between gas turbine cycle and Rankine cycle of a combined cycle power plant which one end is connected to the outlet of gas turbine (as primary combustion oxidizer) and the other end opened to the heat recovery steam generator. Then, the exergoeconomic-environmental analysis of the proposed model is evaluated. Results demonstrate that efficiency of the combined cycle power plant increases about 6% and CO_2 emission reduces up to 5.63% in this proposed model. It is found that the variation in the cost is less than 1% due to the fact that a cost constraint is implemented to be equal or lower than the design point cost. Moreover, exergy of flow gases increases in all points except in heat recovery steam generator. Hence, available exergy for work production in both gas cycle and steam cycle will increase in new model.

  18. Steam oxidation of X20CrMoV121: Comparison of laboratory exposures and in situ exposure in power plants

    DEFF Research Database (Denmark)

    Montgomery, M.; Hansson, A. N.; Vilhelmsen, T.

    2012-01-01

    X20CrMoV121 is a 12% Cr martensitic steel which has been used in power plants in Europe for many decades. Specimens have been removed from superheater tubes to investigate long‐term exposure with respect to steam oxidation. These tubes have been exposed for various durations up to 135 000 h...... in power plants in Denmark at steam temperatures varying from 450–565 °C. This paper collates the data, compares oxide morphologies and assesses to what extent parabolic kinetics can be used to describe the oxidation rate. The steam oxidation behaviour has been investigated in the laboratory in an Ar‐46%H2...

  19. Staranje cevi uparjalnikov v Jedrski elektrarni Krško: Aging of tubes in the Krško nuclear power plant's steam generators:

    OpenAIRE

    Androjna, Ferdo; Cizelj, Leon

    2000-01-01

    The paper reviews the domestic efforts devoted to the safe and reliable operation of the Krško nuclear power plant (NPP) at full power, close to the design limit of the steam generators (18% of plugged tubes) for a full decade. This includes an overview of the recent status and history of the degradation processes, discussion of repair criteria, defining the acceptable size of defects and selected results from safety analyses supporting the operation of degraded steam generator (SG) tubes. It...

  20. Electrolysis: Information and Opportunities for Electric Power Utilities

    Energy Technology Data Exchange (ETDEWEB)

    Kroposki, B.; Levene, J.; Harrison, K.; Sen, P.K.; Novachek, F.

    2006-09-01

    Recent advancements in hydrogen technologies and renewable energy applications show promise for economical near- to mid-term conversion to a hydrogen-based economy. As the use of hydrogen for the electric utility and transportation sectors of the U.S. economy unfolds, electric power utilities need to understand the potential benefits and impacts. This report provides a historical perspective of hydrogen, discusses the process of electrolysis for hydrogen production (especially from solar and wind technologies), and describes the opportunities for electric power utilities.

  1. Impact of power purchases from non-utilities on the utility cost of capital

    International Nuclear Information System (INIS)

    Kahn, E.; Stoft, S.; Belden, T.

    1995-01-01

    The bond rating agencies in the USA have asserted that long-term power purchase contracts between non-utility generators and utilities are the equivalent of debt to the utilities, and therefore raise the cost of capital to the purchaser. Non-Utility generators claim that these contracts reduce risk to the utilities. This debate is reflected in the 1992 Energy Policy Act. This paper investigates this controversy from the perspective of the equity markets. Using a CAPM framework, various specifications of the cost of equity capital are estimated, to shed light on this question. No evidence is found for the hypothesis that non-utility generation contracts raise the cost of capital. There does appear to be a slight increase in this cost for those utilities seeking to build their own generation capacity as opposed to purchasing it from non-utility suppliers. (author)

  2. An analysis of electric utility embedded power supply costs

    International Nuclear Information System (INIS)

    Kahal, M.; Brown, D.

    1998-01-01

    There is little doubt that for the vast majority of electric utilities the embedded costs of power supply exceed market prices, giving rise to the stranded cost problem. Beyond that simple generalization, there are a number of crucial questions, which this study attempts to answer. What are the regional patterns of embedded cost differences? To what extent is the cost problem attributable to nuclear power? How does the cost of purchased power compare to the cost of utility self-generation? What is the breakdown of utility embedded generation costs between operating costs - which are potentially avoidable--and ownership costs, which by definition are ''sunk'' and therefore not avoidable? How will embedded generation costs and market prices compare over time? These are the crucial questions for states as they address retail-restructuring proposal. This study presents an analysis of generation costs, which addresses these key questions. A computerized costing model was developed and applied using FERC Form 1 data for 1995. The model analyzed embedded power supply costs (i.e.; self-generation plus purchased power) for two groups of investor-owned utilities, 49 non-nuclear vs. 63 nuclear. These two subsamples represent substantially the entire US investor-owned electric utility industry. For each utility, embedded cost is estimated both at busbar and at meter

  3. Viewpoint of utilities regarding fuel management of nuclear power plants

    International Nuclear Information System (INIS)

    Held, C.; Moraw, G.; Schneeberger, M.; Szeless, A.

    1977-01-01

    The engagement of utilities in nuclear power requires them to engage in an increasing amount of fuel management activities in order to carry out all the tasks involved. Essentially, these activities involve two main areas: The procurement of all steps of the fuel cycle from the head to the back end; and in-core fuel management. A general survey of the different steps of the nuclear fuel cycle is presented together with the related activities and responsibilities which have to be borne by the utilities. Today's increasing utility involvement in the nuclear fuel management is shown, as well as future fuel management trends. The fuel management activities of the utilities are analysed with respect to organizational, technical, safeguarding, and financial aspects. The active participation of the utilities in fuel management helps to achieve high availability and flexibility of the nuclear power plant during its whole life as well as safe waste isolation. This can be ensured by continuous optimization of all fuel management aspects of the power plant or, on a larger scale, of a power plant system, i.e. activities by utilities to minimize fuel-cycle effects on the environment, which include optimization of fuel behaviour, and radiation exposure to the public and personnel; and technical and economic evaluations by utilities of out- and in-core fuel management. (author)

  4. Model and control scheme for recirculation mode direct steam generation parabolic trough solar power plants

    International Nuclear Information System (INIS)

    Guo, Su; Liu, Deyou; Chen, Xingying; Chu, Yinghao; Xu, Chang; Liu, Qunming; Zhou, Ling

    2017-01-01

    Highlights: •A nonlinear dynamic model of recirculation DSG parabolic trough is developed. •Collector row, water separator and spray attemperator are modeled, respectively. •The dynamic behaviors of the collector field are simulated and analyzed. •Transfer functions of water level and outlet fluid temperature are derived. •Multi-model switching generalized predictive control strategy is developed. -- Abstract: This work describes and evaluates a new nonlinear dynamic model, and a new generalized predictive control scheme for a collector field of direct steam generation parabolic troughs in recirculation mode. Modeling the dynamic behaviors of collector fields is essential to design, testing and validation of automatic control systems for direct steam generation parabolic troughs. However, the behaviors of two-phase heat transfer fluids impose challenges to simulating and developing process control schemes. In this work, a new nonlinear dynamic model is proposed, based on the nonlinear distributed parameter and the nonlinear lumped parameter methods. The proposed model is used to simulate and analyze the dynamic behaviors of the entire collector field for recirculation mode direct steam generation parabolic troughs under different weather conditions, without excessive computational costs. Based on the proposed model, transfer functions for both the water level of the separator and outlet steam temperatures are derived, and a new multi-model switching generalized predictive control scheme is developed for simulated control of the plant behaviors for a wide region of operational conditions. The proposed control scheme achieves excellent control performance and robustness for systems with long delay, large inertia and time-varying parameters, and efficiently solves the model mismatching problem in direct steam generation parabolic troughs. The performances of the model and control scheme are validated with design data from the project of Integration of Direct

  5. Hard sludge formation in modern steam generators of nuclear power plants. Formation, risks and mitigation

    International Nuclear Information System (INIS)

    Strohmer, F.

    2014-01-01

    In recent years modern steam generators with triangular pitch tube bundle geometry have experienced damage caused by hard sludge formation on top of the tube sheet and denting. The effect can lead to a limitation of the modern steam generators’ lifetime. The current publication shows reasons for the generation of hard sludge formation. Moreover, it describes the risk arising from hard sludge formation for the concerned steam generators and the mitigation of the problem. The main factors contributing to the formation of hard sludge are: the amount of corrosion product ingress into the steam generators, hard sludge formation favouring impurities and, skipped maintenance applications during outages. The main damaging mechanism of denting that can arise under certain secondary side conditions from hard sludge is explained. For steam generator tube denting, aggressive, oxidizing conditions have to be established in crevices beneath the hard sludge piles. Severely dented tubes are sensitive toward outer diameter stress corrosion cracking (ODSCC). The denting and ODSCC mechanism is explained. In addition, a proactive long-term maintenance strategy to avoid the formation of hard sludge piles will be shown. The strategy is based on a reduction of the corrosion product ingress into the steam generator's secondary side, and on the regular removal of deposits from the tube sheet and from the entire upper bundle area by latest mechanical cleaning methods. For hard deposits - formed either by silicates or long term hardened corrosion products, which, in the past, could not be removed by chemical or mechanical means - a new, simple, mechanical cleaning method is presented. This method can be used during the normal time frame of an outage and allows the restart of the unit with clean steam generator tube sheets. This mitigates the tendency to form hard sludge and denting in the long term. (author)

  6. In-service diagnostic systems of steam generators, pressurizers and other components of WWER type nuclear power plants

    International Nuclear Information System (INIS)

    Matal, O.

    1988-01-01

    A detailed description is presented of the systems of vibration inspections and systems of determining residual service life, implemented as in-service diagnostic systems for steam generators and pressurizers at the Dukovany nuclear power plant. Low temperature accelerometers of the KD or KS type and high temperature accelerometers CA 91 are used as vibration sensors. In the system of vibration inspection a total of 64 vibration measuring chains of Czechoslovak make and design are installed in the power plant. Systems are being built for determining residual service life which consist of 75 special chains for heat monitoring with thermocouples installed on selected assemblies of the steam generators and the pressurizers serving to monitor and evaluate heat stress. Also included in the system for determining residual service life are 16 routes for water withdrawal from steam generators. Their purpose is to make in-service determinations of places of biggest concentrations of impurities in secondary water, to determine the biggest local chemical exposure of primary collector and heat exchange tube materials and to optimize the size and place of leachate withdrawal. (Z.M.). 2 figs., 2 tabs., 15 refs

  7. Rehabilitation and extension of the useful operating life of a high pressure casing of the 75 MW steam turbine of the thermoelectric power plant President Juarez in Rosarito, B.C.; Rehabilitacion y extension de vida util de una carcasa de alta presion de la turbina de vapor de 75 MW de la central termoelectrica Presidente Juarez en Rosarito, B.C.

    Energy Technology Data Exchange (ETDEWEB)

    Mazur C, Zdzislaw; Hernandez R, Alejandro; Luna R, Alberto [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Fernandez, Rafael; Nieblas, Enrique [Comision Federal de Electricidad, Rosarito, Baja California (Mexico)

    2004-07-01

    The effective operation of the steam turbines is important to the world industries, but as all machinery, it is necessary to constantly examine and give maintenance to this equipment with the purpose of producing better results. Yet, many steam turbines arrive at an operation period of 30 or 40 years, over their original design capacity. A factor like this, only augments the probabilities of future problems with the casings, such as: thermal fatigue fissures, deformation of the horizontal union and erosion problems in the low pressure housings. The deformation of the casing can affect its capacity to maintain aligned the stationary parts of the turbine, as a consequence, damages can appear in the fixed and rotary components by interference or friction. Also, the water induction can deform the casing to such a degree that, the alignment of the stationary parts is altered until it causes contact and friction between stationary and rotary parts. However, depending on the type and degree of the casing deformation, different methods of rehabilitation can be applied. The core goal is to recover the planarity of the union of the flanges, re-machining the plane of the flange of the upper and lower casing or, alternatively, to carry out a scraping by hand. [Spanish] El funcionamiento eficaz de las turbinas de vapor es importante para las industrias del mundo, pero como toda maquinaria, es necesario examinar y dar mantenimiento constantemente a este equipo con la finalidad de producir mejores resultados. Con todo, muchas turbinas de vapor llegan a un periodo de operacion de 30 o 40 anos, por encima de su capacidad de diseno original. Un factor como este, solo eleva las probabilidades de futuros problemas con las carcasas, tales como: fisuras por fatiga termica, deformacion de la union horizontal y problemas de erosion en las carcasas de baja presion. La deformacion de la carcasa puede afectar su capacidad para mantener alineadas las partes estacionarias de la turbina, como

  8. Development and application of the lancing system of delta-60 steam generator-Kori nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Jeong, W. T.; Han, D. Y.; Ahn, N. S.; Jo, B. H.; Hong, Y. W.

    2001-01-01

    A lancing system for removing the deposits on the tube sheet of a nuclear steam generator using high pressure water was developed and applied to Kori Nuclear Power Plant( NPP) Unit 1. As the place where the lancing system is to be installed is relatively high radioactive area, every part consisting the equipment is carefully selected to be radiation resistant. The lancing robot was designed to be water proof to aviod possible malfunction of the lancing robot because of high pressure water. To minimize radiation exposure to operators, the system was designed considering easy installation and maintenance in mind. Water ejection nozzle are designed to have high strength with special material and heat treatment so as to lessen abrasion caused by high pressure ejection. The lancing system showed good performance during the on-site lancing using the system for Delta-60 steam generator of Kori NPP No. 1 in October 2000

  9. Physical data generation methodology for return-to-power steam line break analysis

    Energy Technology Data Exchange (ETDEWEB)

    Zee, Sung Kyun; Lee, Chung Chan; Lee, Chang Kue [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-02-01

    Current methodology to generate physics data for steamline break accident analysis of CE-type nuclear plant such as Yonggwang Unit 3 is valid only if the core reactivity does not reach the criticality after shutdown. Therefore, the methodology requires tremendous amount of net scram worth, specially at the end of the cycle when moderator temperature coefficient is most negative. Therefore, we need a new methodology to obtain reasonably conservation physics data, when the reactor returns to power condition. Current methodology used ROCS which include only closed channel model. But it is well known that the closed channel model estimates the core reactivity too much negative if core flow rate is low. Therefore, a conservative methodology is presented which utilizes open channel 3D HERMITE model. Current methodology uses ROCS which include only closed channel model. But it is well known that the closed channel model estimates the core reactivity too much negative if core flow rate is low. Therefore, a conservative methodology is presented which utilizes open channel 3D HERMITE model. Return-to-power reactivity credit is produced to assist the reactivity table generated by closed channel model. Other data includes hot channel axial power shape, peaking factor and maximum quality for DNBR analysis. It also includes pin census for radiological consequence analysis. 48 figs., 22 tabs., 18 refs. (Author) .new.

  10. Steampunk: Full Steam Ahead

    Science.gov (United States)

    Campbell, Heather M.

    2010-01-01

    Steam-powered machines, anachronistic technology, clockwork automatons, gas-filled airships, tentacled monsters, fob watches, and top hats--these are all elements of steampunk. Steampunk is both speculative fiction that imagines technology evolved from steam-powered cogs and gears--instead of from electricity and computers--and a movement that…

  11. Real-time simulation of MHD/steam power plants by digital parallel processors

    International Nuclear Information System (INIS)

    Johnson, R.M.; Rudberg, D.A.

    1981-01-01

    Attention is given to a large FORTRAN coded program which simulates the dynamic response of the MHD/steam plant on either a SEL 32/55 or VAX 11/780 computer. The code realizes a detailed first-principle model of the plant. Quite recently, in addition to the VAX 11/780, an AD-10 has been installed for usage as a real-time simulation facility. The parallel processor AD-10 is capable of simulating the MHD/steam plant at several times real-time rates. This is desirable in order to develop rapidly a large data base of varied plant operating conditions. The combined-cycle MHD/steam plant model is discussed, taking into account a number of disadvantages. The disadvantages can be overcome with the aid of an array processor used as an adjunct to the unit processor. The conversion of some computations for real-time simulation is considered

  12. Experiences from Loviisa Nuclear Power Station concerning the decontamination of steam generators and primary system components

    International Nuclear Information System (INIS)

    Jaernstroem, R.

    1989-01-01

    Loviisa 1 and 2 are 465 MWe PWR units of the Soviet type VVER-440. Loviisa 1 has been in commercial operation since spring 1977 and Loviisa 2 from the beginning of 1980. Decontamination of primary circuit components - even big ones as steam generators - can be performed in an efficient and quick way with good results and resonable expences. Total costs for decontamination of the two steam generators including planning, construction, documentation, operation, chemicals etc. did not rise above 100,000.00 dollars. (author) 6 figs., 2 tabs

  13. Examination of failed studs from No. 2 steam generator at the Maine Yankee Nuclear Power Station

    International Nuclear Information System (INIS)

    Czajkowski, C.

    1983-02-01

    Three studs removed from service on the primary manway cover from steam generator No. 2 of the Maine Yankee station were sent to Brookhaven National Laboratory (BNL) for examination. The examination consisted of visual/dye penetrant examination, optical metallography and Scanning Electron Microscopy/Energy Dispersive Spectroscopy (SEM/EDS) evaluation. One bolt was through cracked and its fracture face was generally transgranular in nature with numerous secondary intergranular cracks. The report concludes that the environmenally assisted cracking of the stud was due to the interaction of the various lubricants used with steam leaks associated with this manway cover

  14. Removal of secondary sludge from steam generators used in French 900 class nuclear power plants

    International Nuclear Information System (INIS)

    Lebouc, B.

    1982-09-01

    The objective is to remove magnetite deposits which have formed on a steam generator tubesheet during plant operation. The deposits are separated from the tubesheet by spraying water at high pressure (about 200 bar at lance nozzle outlets) on each tube bundle ligament, i.e. the spaces between steam generator tubes. The water is recovered in suction lines and then filtered in two seperate units. The residue obtained after settling is removed in the form of solid waste. This paper presents the sludge lancing technique (spray lances, sludge recovery, liquid waste, cooling). A typical operating sequence is detailed (duration, personnel). Specifications for the equipment used are given

  15. Steam-generator tube failures: world experience in water-cooled nuclear power reactors during 1972

    International Nuclear Information System (INIS)

    Stevens-Guille, P.D.

    1975-01-01

    During 1972, approximately one in three operating reactors with steam generators incurred tube failures, predominantly near the tube sheet and in the bend region. Various forms of corrosion were the most frequent cause of failure. Eddy-current inspection was the preferred method for locating and investigating the cause of failure. Extensive use was made of both mechanical and explosive plugs for repair. As a class, steam generators with Monel 400 tubes had the lowest failure rates, and those with Inconel 600 tubes had the highest. (U.S.)

  16. Performance analysis of a Kalina cycle for a central receiver solar thermal power plant with direct steam generation

    International Nuclear Information System (INIS)

    Modi, Anish; Haglind, Fredrik

    2014-01-01

    Solar thermal power plants have attracted increasing interest in the past few years – with respect to both the design of the various plant components, and extending the operation hours by employing different types of storage systems. One approach to improve the overall plant efficiency is to use direct steam generation with water/steam as both the heat transfer fluid in the solar receivers and the cycle working fluid. This enables operating the plant with higher turbine inlet temperatures. Available literature suggests that it is feasible to use ammonia-water mixtures at high temperatures without corroding the equipment by using suitable additives with the mixture. The purpose of the study reported here was to investigate if there is any benefit of using a Kalina cycle for a direct steam generation, central receiver solar thermal power plant with high live steam temperature (450 °C) and pressure (over 100 bar). Thermodynamic performance of the Kalina cycle in terms of the plant exergy efficiency was evaluated and compared with a simple Rankine cycle. The rates of exergy destruction for the different components in the two cycles were also calculated and compared. The results suggest that the simple Rankine cycle exhibits better performance than the Kalina cycle when the heat input is only from the solar receiver. However, when using a two-tank molten-salt storage system as the primary source of heat input, the Kalina cycle showed an advantage over the simple Rankine cycle because of about 33 % reduction in the storage requirement. The solar receiver showed the highest rate of exergy destruction for both the cycles. The rates of exergy destruction in other components of the cycles were found to be highly dependent on the amount of recuperation, and the ammonia mass fraction and pressure at the turbine inlet. - Highlights: •Kalina cycle for a central receiver solar thermal power plant with direct steam generation. •Rankine cycle shows better plant exergy

  17. Structural integrity analysis of a steam turbine

    International Nuclear Information System (INIS)

    Villagarcia, Maria P.

    1997-01-01

    One of the most critical components of a power utility is the rotor of the steam turbine. Catastrophic failures of the last decades have promoted the development of life assessment procedures for rotors. The present study requires the knowledge of operating conditions, component geometry, the properties of materials, history of the component, size, location and nature of the existing flaws. The aim of the present work is the obtention of a structural integrity analysis procedure for a steam turbine rotor, taking into account the above-mentioned parameters. In this procedure, a stress thermal analysis by finite elements is performed initially, in order to obtain the temperature and stress distribution for a subsequent analysis by fracture mechanics. The risk of a fast fracture due to flaws in the central zone of the rotor is analyzed. The procedure is applied to an operating turbine: the main steam turbine of the Atucha I nuclear power utility. (author)

  18. Development of technologies on innovative-simplified nuclear power plant using high-efficiency steam injectors (2) analysis of heat balance of innovative-simplified nuclear power plant

    International Nuclear Information System (INIS)

    Goto, S.; Ohmori, S.; Mori, M.

    2005-01-01

    It is possible to establish simplified system with reduced space and total equipment weight using high-efficiency Steam Injector (SI) instead of low-pressure feedwater heaters in Nuclear Power Plant (NPP)(1)-(6). The SI works as a heat exchanger through direct contact between feedwater from the condensers and extracted steam from the turbines. It can get a higher pressure than supplied steam pressure, so it can reduce the feedwater pumps. The maintenance and reliability are still higher because SI has no movable parts. This paper describes the analysis of the heat balance and plant efficiency of this Innovative- Simplified NPP with high-efficiency SI. The plant efficiency is compared with the electric power of 1100MWe-class BWR system and the Innovative- Simplified BWR system with SI. The SI model is adapted into the heat balance simulator with a simplified model. The results show plant efficiencies of the Innovated-Simplified BWR system are almost equal to the original BWR one. The present research is one of the projects that are carried out by Tokyo Electric Power Company, Toshiba Corporation, and six Universities in Japan, funded from the Institute of Applied Energy (IAE) of Japan as the national public research-funded program. (authors)

  19. Development of technologies on innovative-simplified nuclear power plant using high-efficiency steam injectors. (2) Analysis of heat balance of innovative-simplified nuclear power plant

    International Nuclear Information System (INIS)

    Goto, Shoji; Ohmori, Shuichi; Mori, Mitchitsugu

    2004-01-01

    It is possible to established simplified systems and reduced space and equipments using high-efficiency Steam Injector (SI) instead of low-pressure feed water heaters in Nuclear Power Plant (NPP). The SI works as a heat exchanger through direct contact between feedwater from condenser and extracted steam from turbine. It can get a higher pressure than supplied steam pressure, so it can reduce the feedwater pumps. The maintenance and reliability are still higher because SI has no movable parts. This paper describes the analysis of the heat balance and plant efficiency of this Innovative-Simplified NPP with high-efficiency SI. The plant efficiency is compared with the electric power of 1100MWe class original BWR system and the Innovative-Simplified BWR system with SI. The SI model is adapted into the heat balance simulator with a simplified model. The results show plant efficiencies of the Innovated-Simplified BWR system are almost equal to the original BWR one. The present research is one of the projects that are carried out by Tokyo Electric Power Company, Toshiba Corporation, and six Universities in Japan, funded from the Institute of Applied Energy (IAE) of Japan as the national public research-funded program. (author)

  20. Performance Comparison on Repowering of a Steam Power Plant with Gas Turbines and Solid Oxide Fuel Cells

    DEFF Research Database (Denmark)

    Rokni, Masoud

    2016-01-01

    Repowering is a process for transforming an old power plant for greater capacity and/or higher efficiency. As a consequence, the repowered plant is characterized by higher power output and less specific CO2 emissions. Usually, repowering is performed by adding one or more gas turbines into an exi......Repowering is a process for transforming an old power plant for greater capacity and/or higher efficiency. As a consequence, the repowered plant is characterized by higher power output and less specific CO2 emissions. Usually, repowering is performed by adding one or more gas turbines...... into an existing steam cycle which was built decades ago. Thus, traditional repowering results in combined cycles (CC). High temperature fuel cells (such as solid oxide fuel cell (SOFC)) could also be used as a topping cycle, achieving even higher global plant efficiency and even lower specific CO2 emissions....... Decreasing the operating temperature in a SOFC allows the use of less complex materials and construction methods, consequently reducing plant and the electricity costs. A lower working temperature makes it also suitable for topping an existing steam cycle, instead of gas turbines. This is also the target...

  1. Gas-steam combined cycles for power generation: Current state-of-the-art and future prospects

    International Nuclear Information System (INIS)

    Macchi, E.; Chiesa, P.; Consonni, S.; Lozza, G.

    1992-01-01

    The first part of this paper points out the many factors which, after years of stagnation in the electric power industry, are giving rise to a true revolution in power generation engineering: the passing from closed cycles, using steam as the working fluid and energy sources external to the power cycle, to the use of open cycles, in which the primary energy source, in the form of a fuel, is directly immersed in the working fluid of the engine. Attention is given to the advantages in terms of energy and cost savings, greater flexibility in energy policy options and pollution abatement which are now being afforded through the use of gas turbines with combined gas-steam cycles. The second part of the paper deals with an assessment of the current state-of-the-art of the technology relative to these innovative power systems. The assessment is followed by a review of foreseen developments in combined cycle system design, choice of construction materials, type of cooling systems, operating temperatures and performance capabilities

  2. Experience with modular steam generator production and application of new testing methods

    International Nuclear Information System (INIS)

    Olesovsky

    Experience is reviewed gained at the Trebic IBZKG plant with the production of modular steam generators. The plant started producing steam generators for the Jaslovske Bohunice nuclear power plant in 1965. In addition to the steam generator for the A-1, the plant also produced a loop for the Melekess power plant and a steam generator for the BOR-60 reactor. Operating experience gained so far allowed improving the quality of the BOR steam generator, especially in the tube-tube plate joint. A double tube plate was used and the welded joint shape was changed. As a result of high requirements on the quality of welded joints, the steam generator has successfully been in operation for more then 10,000 hours. The existing experience was utilized in designing a new steam generator named Nadya. Many design and technological requirements were presented concerning the Nadya generator and many new checking operations have been included in technology. (Kr)

  3. Chemistry of water and steam in power plants and related technologies. Glossary of terms and definitions English - German; German - English

    Energy Technology Data Exchange (ETDEWEB)

    Schmitz, H.P.; Teutenberg, U.

    2006-07-01

    This new edition of a technical dictionary is an evaluation of the technical terms found in the domestic and foreign literature and in information brochures of specialist firms, directives, guidelines, standards, etc. This dictionary contains more than 3,000 terms mainly with definitions with respect to the chemistry of water and steam in power plants along with the related types of water (untreated water, feedwater and boiler water, make-up water, waste water) and the water treatment processes (ion exchange, membrane process, etc.), water conditioning and chemical analysis, internal cleaning of steam generating plants (e.g. flushing, boiling-out, pre-operational and operational acid cleaning, steam blowing) as well as fundamentals of water chemistry. The technical knowledge of the authors, Heinz-Peter Schmitz, FDBR, with more than 25 years professional experience as translator/official in charge of documentation and Ulrich Teutenberg, Babcock/Hitachi with more than 30 years professional experience as senior consultant for water chemistry and commissioning is reflected in this dictionary. Part 1 contains the English-German version, Part 2 the German-English version. (orig.)

  4. Fuzzy logic controller architecture for water level control in nuclear power plant steam generator using ANFIS training method

    International Nuclear Information System (INIS)

    Vosoughi, Naser; Ekrami, AmirHasan; Naseri, Zahra

    2003-01-01

    Since suitable control of water level can greatly enhance the operation of a power station, a fuzzy logic controller is applied to control the steam generator water level in a pressurized water reactor. The method does not require a detailed mathematical model of the object to be controlled. It is shown that two inputs, a single output and the least number of rules (9 rules) are considered for a controller, and the ANFIS training method is employed to model functions in a controlled system. By using ANFIS training method, initial membership functions will be trained and appropriate functions are generated to control water level inside the steam generator while using the stated rules. The proposed architecture can construct an input-output mapping based on both human knowledge (in the from of fuzzy if - then rules) and stipulated input-output data. This fuzzy logic controller is applied to the steam generator level control by computer simulations. The simulation results confirm the excellent performance of this control architecture in compare with a well-turned PID controller. (author)

  5. Optimal pricing of non-utility generated electric power

    International Nuclear Information System (INIS)

    Siddiqi, S.N.; Baughman, M.L.

    1994-01-01

    The importance of an optimal pricing policy for pricing non-utility generated power is pointed out in this paper. An optimal pricing policy leads to benefits for all concerned: the utility, industry, and the utility's other customers. In this paper, it is shown that reliability differentiated real-time pricing provides an optimal non-utility generated power pricing policy, from a societal welfare point of view. Firm capacity purchase, and hence an optimal price for purchasing firm capacity, are an integral part of this pricing policy. A case study shows that real-time pricing without firm capacity purchase results in improper investment decisions and higher costs for the system as a whole. Without explicit firm capacity purchase, the utility makes greater investment in capacity addition in order to meet its reliability criteria than is socially optimal. It is concluded that the non-utility generated power pricing policy presented in this paper and implied by reliability differentiated pricing policy results in social welfare-maximizing investment and operation decisions

  6. Measurement by eddy currents of tube-antivibratory bar gap steam generators of PWR power plants

    International Nuclear Information System (INIS)

    Savin, E.; Bieth, M.; Floze, J.C.

    1990-01-01

    In steam generators tubes are maintained by AVB to limit vibrations amplitude induced by secondary fluid flow. After some years wear sometimes occurs. For gap measurement between tubes and AVB Framatome developed a method based on eddy current and using a probe rotating inside the tube [fr

  7. EXTRACSION: a system for automatic Eddy Current diagnosis of steam generator tubes in nuclear power plants

    International Nuclear Information System (INIS)

    Georgel, B.; Zorgati, R.

    1992-01-01

    Improving speed and quality of Eddy Current non-destructive testing of steam generator tubes leads to automation of all process that contribute to diagnosis. This paper describes how signal processing, pattern recognition and artificial and artificial intelligence are used to build a software package that is able to automatically provide an efficient diagnosis. (author)

  8. Burst protection device for largely cylindrical steam raising units, preferably of pressurized water nuclear power stations

    International Nuclear Information System (INIS)

    Mutzl, J.

    1978-01-01

    This burst protection device controls forces to be expected in an accident by resolving them into axial (vertical) and radial (horizontal) components, which are taken by a large number of elements stressed in tension. The steam raising unit is surrounded by a containment, but remains easily accessible. The containment consists of a steel jacket, lid and floor. Several cylindrical sections above one another form the steel jacket, which surrounds the steam raising unit with an intermediate insulating layer of concrete. The insulating concrete cylinder is of several times the thickness of the steel jacket, and also consists of cylindrical sections. An outer supporting ring for the lid and floor of the containment have outside diameters which project beyond the jacket. Prestressed circumferential vertical tension ropes between the supporting ring and floor take any additional tensional forces. The lid is domed with downward curvature towards the upper boiler dome. Internal bursting forces produce compressive stresses in the lid, which thus pass along its outside diameter into the surrounding ring. The lid, which is devided along one diameter, makes dismantling and access to the boiler easy even with a central steam pipe going upwards. The floor of the burst protection is also the floor of the steam raising unit. It is of several times the thickness of the tube floor, which, with its spacing above the floor forms the usual inlet and outlet space for the reactor cooling water. The main coolant pump installed there is driven by an external motor through a floor penetration. (HP) [de

  9. 75 FR 8753 - Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental...

    Science.gov (United States)

    2010-02-25

    ... Dusenbury of the North Carolina Department of Environment and Natural Resources regarding the environmental... & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No... identification of licensing and regulatory actions requiring environmental assessments,'' the NRC prepared an...

  10. Extraction: a system for automatic eddy current diagnosis of steam generator tubes in nuclear power plants

    International Nuclear Information System (INIS)

    Georgel, B.; Zorgati, R.

    1994-01-01

    Improving speed and quality of Eddy Current non-destructive testing of steam generator tubes leads to automatize all processes that contribute to diagnosis. This paper describes how we use signal processing, pattern recognition and artificial intelligence to build a software package that is able to automatically provide an efficient diagnosis. (authors). 2 figs., 5 refs

  11. Temperature conditions in an LMFBR power plant from primary sodium to steam circuits

    International Nuclear Information System (INIS)

    Aubert, M.; Chaumont, M.; Mougniot, M.; Recolin, M.; Acket, M.

    1978-01-01

    The subject is discussed under the headings: introduction; method and procedure (optimization program, review of process constraints - fuel limitations, turbine, steam generators, parameter selection - core parameters, temperatures, counterbalancing forces affecting temperatures); optimum values of parameters, with effect on costs; conclusion, (U.K.)

  12. The solubility of inorganic compounds in water and steam with particular reference to silica and iron oxides and its deposits in power plant cycles

    International Nuclear Information System (INIS)

    Heitmann, H.G.

    1975-01-01

    The presence of silica in the water-steam cycle can be extremely detrimental to the operation of a high pressure power station. The solubility diagram of silica in water and steam obtained from numerous measurements is presented. The solubility and deposition of corrosion products, particularly iron oxyde, were investigated together with the effect on heat transfer in heated steam generator tubes. The remove corrosion products from feedwater, electromagnetic filters may be employed and their installation in the primary circuits of the PWR type reactors leads to a considerable reduction of the corrosion products and activity levels

  13. Characteristics of steam jet impingement on annulus

    International Nuclear Information System (INIS)

    Yoon, Sang H.; Kim, Won J.; Suh, Kune Y.; Song, Chul H.

    2004-01-01

    The steam jet impingement occurs when the steam through the cold leg from the steam generator strikes the inner reactor barrel during the reflood phase of a loss-of-coolant accident (LOCA), which is a characteristic behavior for the APR1400 (Advanced Power Reactor 1400 MWe). In the cold leg break LOCA, the steam and water flows in the downcomer are truly multidimensional. The azimuthal velocity distribution of the steam flow has an important bearing on the thermal hydraulic phenomena such as the emergency coolant water direct bypass, sweepout, steam condensation, and so forth. The investigation of jet flow is required to determine the steam path and momentum reduction rate after the impingement. For the observation of the steam behavior near the break, the computational fluid dynamic (CFD) analysis has been carried out using CFX5.6. The flow visualization and analysis demonstrate the velocity profiles of the steam flow in the annulus region for the same boundary conditions. Pursuant to the CFD results, the micro-Pitot tubes were positioned at varying angles, and corrected for their sensitivity. The experiments were carried out to directly measure the pressure differential and to visualize the flow utilizing a smoke injection method. Results from this study are slated to be applied to MARS, which is a thermal hydraulic system code for the best-estimate analysis. The current one- or two-dimensional analysis in MARS was known to distort the local flow behavior. To enhance prediction capability of MARS, it is necessary to inspect the steam path in the break flow and mechanically simulate the momentum variation. The present experimental and analytical results can locally be applied to developing the engineering models of specific and essential phenomena. (author)

  14. Evaluation of the Geothermal Public Power Utility Workshops in California

    Energy Technology Data Exchange (ETDEWEB)

    Farhar, B. C.

    2004-10-01

    The federal government devotes significant resources to educating consumers and businesses about geothermal energy. Yet little evidence exists for defining the kinds of information needed by the various audiences with specialized needs. This paper presents the results of an evaluation of the Geothermal Municipal Utility Workshops that presented information on geothermal energy to utility resource planners at customer-owned utilities in California. The workshops were sponsored by the Western Area Power Administration and the U.S. Department of Energy's GeoPowering the West Program and were intended to qualitatively assess the information needs of municipal utilities relative to geothermal energy and get feedback for future workshops. The utility workshop participants found the geothermal workshops to be useful and effective for their purposes. An important insight from the workshops is that utilities need considerable lead-time to plan a geothermal project. They need to know whether it is better to own a project or to purchase geothermal electricity from another nonutility owner. California customer-owned utilities say they do not need to generate more electricity to meet demand, but they do need to provide more electricity from renewable resources to meet the requirements of the state's Renewable Portfolio Standard.

  15. Basic plan for nuclear power development and utilization in 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents specific measures to be carried out in 1987 to promote research, development and application of nuclear power. The first part deals with the strengthening of safety measures, centering on the improvement in regulation and administration for nuclear power safety; promotion of safety studies; improvement and strengthening of disaster prevention measures; improvement and strengthening of environmental activity surveys; improvement in exposure control measures for nuclear power operation workers; and establishment of the nuclear fuel cycle and safety in such activities as development of new reactors. The second part of the report addresses the promotion of nuclear power generation. Measures for this will be focused on the promotion of location of nuclear power plants and the development of advanced technology for light water reactors. The third part describes measures for establishing the nuclear fuel cycle, which cover the procurement of uranium resources; enrichment of uranium; reprocessing of spent fuel and utilization of plutonium and recovered uranium; and disposal of radioactive waste. Other parts presents measures to be carried out for the development of new power reactors; research on nuclear fusion; development of nuclear powered vessels; application of radiations; improvement in the infrastructure for nuclear power development and utilization; etc. (Nogami, K.)

  16. REDUCING POWER PRODUCTION COSTS BY UTILIZING PETROLEUM COKE

    Energy Technology Data Exchange (ETDEWEB)

    Kevin C. Galbreath; Donald L. Toman; Christopher J. Zygarlicke

    1999-09-01

    Petroleum coke, a byproduct of the petroleum-refining process, is an attractive primary or supplemental fuel for power production primarily because of a progressive and predictable increase in the production volumes of petroleum coke (1, 2). Petroleum coke is most commonly blended with coal in proportions suitable to meet sulfur emission compliance. Petroleum coke is generally less reactive than coal; therefore, the cofiring of petroleum coke with coal typically improves ignition, flame stability, and carbon loss relative to the combustion of petroleum coke alone. Although petroleum coke is a desirable fuel for producing relatively inexpensive electrical power, concerns about the effects of petroleum coke blending on combustion and pollution control processes exist in the coal-fired utility industry (3). The Energy & Environmental Research Center (EERC) completed a 2-year technical assessment of petroleum coke as a supplemental fuel. A survey questionnaire was sent to seven electric utility companies that are currently cofiring coal and petroleum coke in an effort to solicit specific suggestions on research needs and fuel selections. An example of the letter and survey questionnaire is presented in Appendix A. Interest was expressed by most utilities in evaluating the effects of petroleum coke blending on grindability, combustion reactivity, fouling, slagging, and fly ash emissions control. Unexpectedly, concern over corrosion was not expressed by the utilities contacted. Although all seven utilities responded to the question, only two utilities, Northern States Power Company (NSP) and Ameren, sent fuels to the EERC for evaluation. Both utilities sent subbituminous coals from the Power River Basin and petroleum shot coke samples. Petroleum shot coke is produced unintentionally during operational upsets in the petroleum refining process. This report evaluates the effects of petroleum shot coke blending on grindability, fuel reactivity, fouling/slagging, and

  17. Study of the European market for industrial nuclear power plants for the mixed production of electricity and steam

    International Nuclear Information System (INIS)

    1975-01-01

    The opportunity of developing the mixed production of electricity and steam from nuclear power plants in the nine countries of the European Community is studied. Both public distribution and autonomous production are envisaged. An attempt is made to estimate the potentiel market for district heating and for chemical, agricultural and alimentary, textile, paper, car manufacture and wood industries. The reactors considered are LWR reactors of at least 1000MWth. Suggestions are given to overcome the difficulties and constraints that stand in the way of a nuclear solution [fr

  18. Cost efficiency of Japanese steam power generation companies: A Bayesian comparison of random and fixed frontier models

    Energy Technology Data Exchange (ETDEWEB)

    Assaf, A. George [Isenberg School of Management, University of Massachusetts-Amherst, 90 Campus Center Way, Amherst 01002 (United States); Barros, Carlos Pestana [Instituto Superior de Economia e Gestao, Technical University of Lisbon, Rua Miguel Lupi, 20, 1249-078 Lisbon (Portugal); Managi, Shunsuke [Graduate School of Environmental Studies, Tohoku University, 6-6-20 Aramaki-Aza Aoba, Aoba-Ku, Sendai 980-8579 (Japan)

    2011-04-15

    This study analyses and compares the cost efficiency of Japanese steam power generation companies using the fixed and random Bayesian frontier models. We show that it is essential to account for heterogeneity in modelling the performance of energy companies. Results from the model estimation also indicate that restricting CO{sub 2} emissions can lead to a decrease in total cost. The study finally discusses the efficiency variations between the energy companies under analysis, and elaborates on the managerial and policy implications of the results. (author)

  19. EPRI steam generator programs

    International Nuclear Information System (INIS)

    Martel, L.J.; Passell, T.O.; Bryant, P.E.C.; Rentler, R.M.

    1977-01-01

    The paper describes the current overall EPRI steam generator program plan and some of the ongoing projects. Because of the recent occurrence of a corrosion phenomenon called ''denting,'' which has affected a number of operating utilities, an expanded program plan is being developed which addresses the broad and urgent needs required to achieve improved steam generator reliability. The goal of improved steam generator reliability will require advances in various technologies and also a management philosophy that encourages conscientious efforts to apply the improved technologies to the design, procurement, and operation of plant systems and components that affect the full life reliability of steam generators

  20. Summary of erosion-corrosion observations made in power stations on damp-steam circuits

    International Nuclear Information System (INIS)

    Lacaille, L.

    1981-01-01

    The development of the light-water system has profoundly modified the operating conditions of the turbines, in which expansion now takes place from the first saturated-steam stages. In addition to the traditional phenomena of mechanical erosion there are now problems of a chemical nature, linked to the temperatures of the liquid phase, which cause destruction in the HP stages of the turbines, the drier-feed heaters, and the linking piping. Systematic observations have been made in the PWR stations at Chooz, Doel, Tihange, Fessenheim, and Le Bugey, followed by trials of materials, improvements in the flow, chemical treatment of the secondary circuit, and reduction of the liquid phase in the steam emerging from the HP turbine [fr

  1. Erosion-corrosion entrainment of iron-containing compounds as a source of deposits in steam generators used at nuclear power plants equipped with VVER reactors

    Science.gov (United States)

    Tomarov, G. V.; Shipkov, A. A.

    2011-03-01

    The main stages and processes through which deposits are generated, migrate, and precipitate in the metal-secondary coolant system of power units at nuclear power plants are analyzed and determined. It is shown that substances produced by the mechanism of general erosion-corrosion are the main source of the ionic-colloid form of iron, which is the main component of deposits in a steam generator. Ways for controlling the formation of deposits in a nuclear power plant's steam generator are proposed together with methods for estimating their efficiency.

  2. Research and engineering application of coordinated instrumentation control and protection technology between reactor and steam turbine generator on nuclear power plant

    International Nuclear Information System (INIS)

    Sun Xingdong

    2014-01-01

    The coordinated instrumentation control and protection technology between reactor and steam turbine generator (TG) usually is very significant and complicated for a new construction of nuclear power plant, because it carries the safety, economy and availability of nuclear power plant. Based on successful practice of a nuclear power plant, the experience on interface design and hardware architecture of coordinated instrumentation control and protection technology between reactor and steam turbine generator was abstracted and researched. In this paper, the key points and engineering experience were introduced to give the helpful instructions for the new project. (author)

  3. Isolating valve, especially in main-steam pipes of power plants

    International Nuclear Information System (INIS)

    Karpenko, A.N.

    1977-01-01

    The valve for PWRs and BWRs, with diameters up to 1.25 m, for temperatures from -180 0 C to about 600 0 C and pressures up to over 50 bar, is designed for high reliability and long useful life. Two circular valve discs are moved as isolating elements in their plane across the steam direction and brought before the valve seat within a valve chamber. Shortly before reaching this final position, each disc is rotated by a small amount about its axis. Only after reaching the final position a double-wedge, further pushed forward between both discs, produces the necessary contact pressure. By revolving and frictionless closing caking together at high stresses and temperature variation is prevented and permanent tightness assured. The valve body is moved in a cylinder, cast on the valve housing, by means of a stepped piston. Its larger diameter is guided in a second cylinder flanged on above. In the cover of the second cylinder a pilot valve is mounted being controlled over 2 parallel solenoid valves by means of compressed air. In normal operation process steam from the valve chamber serves to move the stepped piston with the valve chamber. On closing of a bore, connecting both cylinder spaces, by the pilot valve the main valve is opened. If the pilot valve is opened the steam through the connecting bore is acting on both piston stages and closing the main valve. On loss of steam (pipe break) or for testing purposes one or the other cylinder space over solenoid valves is acted upon by auxiliary energy or evacuated, the main valve thus being controlled. (HP) [de

  4. Ways of TPP and NPP powerful steam turbine blade erosion decreasing in low flow rate regimes

    International Nuclear Information System (INIS)

    Khrabrov, P.V.; Khaimov, V.A.; Matveenko, V.A.

    1986-01-01

    A systematized approach to the problem of efficient cooling of flow passage and exhaust parts of TPP and NPP steam turbines and prevention of erosion wear of inlet and outlet edges of operating blades is presented. Methods for LP casing cooling and sources of erosion-hazard moisture as well as the main technological and design measures to decrease the erosion of blades are determined

  5. Thermodynamic modeling of the power plant based on the SOFC with internal steam reforming of methane

    International Nuclear Information System (INIS)

    Ivanov, Peter

    2007-01-01

    Mathematical model based on the thermodynamic modeling of gaseous mixtures is developed for SOFC with internal steam reforming of methane. Macroscopic porous-electrode theory, including non-linear kinetics and gas-phase diffusion, is used to calculate the reforming reaction and the concentration polarization. Provided the data concerning properties and costs of materials the model is fit for wide range of parametric analysis of thermodynamic cycles including SOFC

  6. Sludge Lancing and Visual Inspection of Steam Generator for KORI Nuclear Power Plant Unit 3

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woo-Tae [Korea Hydro and Nuclear Power Co. Ltd. Central Research Institute, Daejeon(Korea, Republic of); Kim, Sang-Tae; Hong, Jae-Yung; Jeong, Yun-Soon [Sae-An Engineering Corporation, Seoul (Korea, Republic of)

    2015-05-15

    Annulus, tube-lane, and in-bundle area of the steam generators were searched for possible foreign objects. No new foreign objects were found. Two foreign objects which were found during previous outage were impossible to remove. Mock-up training before the operation was helpful to finish the service as scheduled. Sludge lancing of the three steam generators was made using FOLAS-I lancing system. FOSAR operations were done using video probe and special tools of Sae-An Engineering Cooperation. The weight of sludge removed from SG 'A', 'B', and 'C' was 177kg, 134kg, 117kg respectively. Bag filters for and cartridge filters consumed for SG 'A', 'B', and 'C' was (53,414), (75,243), and (61,171) respectively. Foreign object search operation for the annulus, the tube lane, and in-bundle area of the steam generators found nothing. Retrieval of the two remaining foreign objects from the previous outage was tried but failed.

  7. Sludge Lancing and Visual Inspection of Steam Generator for KORI Nuclear Power Plant Unit 3

    International Nuclear Information System (INIS)

    Jeong, Woo-Tae; Kim, Sang-Tae; Hong, Jae-Yung; Jeong, Yun-Soon

    2015-01-01

    Annulus, tube-lane, and in-bundle area of the steam generators were searched for possible foreign objects. No new foreign objects were found. Two foreign objects which were found during previous outage were impossible to remove. Mock-up training before the operation was helpful to finish the service as scheduled. Sludge lancing of the three steam generators was made using FOLAS-I lancing system. FOSAR operations were done using video probe and special tools of Sae-An Engineering Cooperation. The weight of sludge removed from SG 'A', 'B', and 'C' was 177kg, 134kg, 117kg respectively. Bag filters for and cartridge filters consumed for SG 'A', 'B', and 'C' was (53,414), (75,243), and (61,171) respectively. Foreign object search operation for the annulus, the tube lane, and in-bundle area of the steam generators found nothing. Retrieval of the two remaining foreign objects from the previous outage was tried but failed

  8. Accident alarm in steam generators in sodium cooled fast reactor power plants. II

    International Nuclear Information System (INIS)

    Matal, O.; Martoch, J.; Taraba, O.; Hanke, V.

    1978-01-01

    Conditions were simulated in the economizer of a steam generator of water leaks in sodium at a sodium flow of O.62x10 -3 to 1.24x10 -3 m 3 /s and a sodium temperature of 320 to 380 degC by injecting water at a pressure of 6 to 10 MPa which roughly corresponds to conditions in an economizer of an actual steam generator with leaks within the limits of 0.01 to 0.3 g/s. The leak was recorded by acoustic detectors at all observed sodium flow rates and temperatures. The mean signal-to-noise ratio was in all cases greater than 2. At the assumed 25 dB noise level of the real steam generator of micromodular design it may be assumed that using existing acoustic detectors with waveguides a 0.02 g/s leak of water into sodium may be detected. The measurements showed that the technical standard of the equipment is at least as good as that of the flowmeter system of accident monitoring. (J.B.)

  9. Advanced on-line monitoring of power plant water/steam quality

    Energy Technology Data Exchange (ETDEWEB)

    Perboni, G.; Rocchini, G.; Sigon, F. [Ente Nazionale per l`Energia Elettrica, Milan (Italy)

    1995-03-01

    To improve the behaviour and resistance of materials in the water-steam cycle critical components (steam generator, condensate heaters, turbine) it is necessary to adopt proper actions for promoting formation and integrity of surface protective oxide layers and preventing general and localised corrosion and transport processes of corrosion products throughout the cycle. In this report two important topics are reported: steam side corrosion in the low pressure turbines induced by the `first condensate` in the final stages of the turbine, and the stability of the oxides layers as a function of the condensate chemistry, with particular attention to the transport of corrosion products to the boiler. Furthermore an innovative technique for monitoring some physico-chemical parameters at the actual fluid temperature (150-300C) using new electrochemical sensors improved by ENEL/CRAM is studied: pH, conductivity, corrosion rate, corrosion and redox potentials.ENEL/CRAM validated on lab-scale testing loops these sensors and carried out the following programs: calibration procedures, reliability of the response, long-term stability and assessment of a reduced maintenance. Applications of the electrochemical methods to fossil fired units have demonstrated their validity for monitoring the cycle chemistry and the resistance to corrosion of structural materials in real time.

  10. Boresonic inspection of steam turbine and generator spindles with the Tomoscan

    International Nuclear Information System (INIS)

    Dube, N.; Bertholotti, D.; Yates, D.

    1990-01-01

    Steam turbine rotors in power utility plants can generate cracks and ultimately fail after long period of use. The inspection of rotors is done on a regular basis and particular attention is paid to areas near bore holes. An automated ultrasound system has been developed to control and ensure the quality of rotor bore holes of steam turbine rotors

  11. Manpower development for safe operation of nuclear power plant. China. Steam generator maintenance, cleaning and repair. Activity: 3.1.8-Task-04. Technical report

    International Nuclear Information System (INIS)

    Esposito, J.N.

    1994-01-01

    The objective of this mission was to present detailed state-of-the-art information on steam generator design, operations and maintenance, to the management, engineers and operators of the Qinshan Nuclear Power Plants. In addition, some limited operation was presented by the Qinshan Nuclear Power Plant representatives in order to aid in focussing the presentations and promoting a high level of discussion

  12. Energy analysis of a combined solid oxide fuel cell with a steam turbine power plant for marine applications

    Science.gov (United States)

    Welaya, Yousri M. A.; Mosleh, M.; Ammar, Nader R.

    2013-12-01

    Strong restrictions on emissions from marine power plants (particularly SO x , NO x ) will probably be adopted in the near future. In this paper, a combined solid oxide fuel cell (SOFC) and steam turbine fuelled by natural gas is proposed as an attractive option to limit the environmental impact of the marine sector. The analyzed variant of the combined cycle includes a SOFC operated with natural gas fuel and a steam turbine with a single-pressure waste heat boiler. The calculations were performed for two types of tubular and planar SOFCs, each with an output power of 18 MW. This paper includes a detailed energy analysis of the combined system. Mass and energy balances are performed not only for the whole plant but also for each component in order to evaluate the thermal efficiency of the combined cycle. In addition, the effects of using natural gas as a fuel on the fuel cell voltage and performance are investigated. It has been found that a high overall efficiency approaching 60% may be achieved with an optimum configuration using the SOFC system. The hybrid system would also reduce emissions, fuel consumption, and improve the total system efficiency.

  13. Impact on the steam electric power industry of deleting Section 316(a) of the Clean Water Act: Capital costs

    International Nuclear Information System (INIS)

    Veil, J.A.

    1993-01-01

    Many power plants discharge large volumes of cooling water. In some cases, the temperature of the discharge exceeds state thermal requirements. Section 316(a) of the Clean Water Act (CWA) allows a thermal discharger to demonstrate that less stringent thermal effluent limitations would still protect aquatic life. About 32% of total US steam electric generating capacity operates under Section 316(a) variances. In 1991, the US Senate proposed legislation that would delete Section 316(a) from the CWA. This study, presented in two companion reports, examines how this legislation would affect the steam electric power industry. This report describes alternatives available to nuclear and coal-fired plants currently operating under variances. Data from 38 plants representing 14 companies are used to estimate the national cost of implementing such alternatives. Although there are other alternatives, most affected plants would be retrofitted with cooling towers. Assuming that all plants currently operating under variances would install cooling towers, the national capital cost estimate for these retrofits ranges from $22.7 billion to $24.4 billion (in 1992 dollars). The second report quantitatively and qualitatively evaluates the energy and environmental impacts of deleting the variance. Little justification has been found for removing the Section 316(a) variance from the CWA

  14. Reducing scram frequency by modifying/eliminating steam generator low-low level reactor trip setpoint for Maanshan nuclear power plant

    International Nuclear Information System (INIS)

    Yuann, R.Y.; Chiang, S.C.; Hsiue, J.K.; Chen, P.C.

    1987-01-01

    The feasibility of modification/elimination of steam generator low-low level reactor trip setpoint is evaluated by using RETRAN-02 code for the purpose of reducing scram frequency in Maanshan 3-loop pressurized water reactor. The ANS Condition II event loss of normal feedwater and condition IV event feedwater system line break are the basis for steam generator low-low level reactor trip setpoint sensitivity analysis, including various initial reactor power levels, reactivity feedback coefficients, and system functions assumptions etc., have been performed for the two basis events with steam generator low-low level reactor trip setpoint at 0% narrow range and without this trip respectively. The feasibility of modifying/eliminating current steam generator low-low level reactor trip setpoint is then determined based on whether the analysis results meet with the ANS Condition II and IV acceptance criteria or not

  15. National Maglev initiative: California line electric utility power system requirements

    Science.gov (United States)

    Save, Phil

    1994-01-01

    The electrical utility power system requirements were determined for a Maglev line from San Diego to San Francisco and Sacramento with a maximum capacity of 12,000 passengers an hour in each direction at a speed of 300 miles per hour, or one train every 30 seconds in each direction. Basically the Maglev line requires one 50-MVA substation every 12.5 miles. The need for new power lines to serve these substations and their voltage levels are based not only on equipment loading criteria but also on limitations due to voltage flicker and harmonics created by the Maglev system. The resulting power system requirements and their costs depend mostly on the geographical area, urban or suburban with 'strong' power systems, or mountains and rural areas with 'weak' power systems. A reliability evaluation indicated that emergency power sources, such as a 10-MW battery at each substation, were not justified if sufficient redundancy is provided in the design of the substations and the power lines serving them. With a cost of $5.6 M per mile, the power system requirements, including the 12-kV DC cables and the inverters along the Maglev line, were found to be the second largest cost component of the Maglev system, after the cost of the guideway system ($9.1 M per mile), out of a total cost of $23 M per mile.

  16. Study on a heat recovery system for the thermal power plant utilizing air cooling island

    International Nuclear Information System (INIS)

    Sun, Jian; Fu, Lin; Sun, Fangtian; Zhang, Shigang

    2014-01-01

    A new heat recovery system for CHP (combined heat and power) systems named HRU (heat recovery unit) is presented, which could recover the low grade heat of exhausted steam from the turbine at the thermal power plant directly. Heat recovery of exhausted steam is often accomplished by recovering the heat of cooling water in current systems. Therefore, two processes of heat transfer is needed at least. However, exhausted steam could be condensed in the evaporator of HRU directly, which reduce one process of heat transfer. A special evaporator is designed condense the exhausted steam directly. Simulated results are compared to experiments, which could include the calculation of heat transfer coefficients of different parts of HRU. It is found that about 25Mw of exhausted steam is recovered by this system. HRU could be promising for conventional CHP systems, which could increase the total energy efficiency obviously and enlarge the heating capacity of a built CHP system. - Highlights: • A new heat recovery system for thermal power plant is presented. • A mathematical model including heat transfer coefficients calculation is given. • This heat recovery system is experimented at a thermal power plant. • Performances of this system under different working conditions are simulated

  17. Energy Conversion Alternatives Study (ECAS), Westinghouse phase 1. Volume 5: Combined gas-steam turbine cycles. [energy conversion efficiency in electric power plants

    Science.gov (United States)

    Amos, D. J.; Foster-Pegg, R. W.; Lee, R. M.

    1976-01-01

    The energy conversion efficiency of gas-steam turbine cycles was investigated for selected combined cycle power plants. Results indicate that it is possible for combined cycle gas-steam turbine power plants to have efficiencies several point higher than conventional steam plants. Induction of low pressure steam into the steam turbine is shown to improve the plant efficiency. Post firing of the boiler of a high temperature combined cycle plant is found to increase net power but to worsen efficiency. A gas turbine pressure ratio of 12 to 1 was found to be close to optimum at all gas turbine inlet temperatures that were studied. The coal using combined cycle plant with an integrated low-Btu gasifier was calculated to have a plant efficiency of 43.6%, a capitalization of $497/kW, and a cost of electricity of 6.75 mills/MJ (24.3 mills/kwh). This combined cycle plant should be considered for base load power generation.

  18. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  19. Development of Technologies on Innovative-Simplified Nuclear Power Plant Using High-Efficiency Steam Injectors (11) Visualization Study on the Start-Up of the Steam Injector

    International Nuclear Information System (INIS)

    Koji Okamoto; Tadashi Narabayashi; Chikako Iwaki; Shuichi Ohmori; Michitsugu Mori

    2006-01-01

    The Steam Injector is the superior system to pump the fluid without rotating machine. Because the water column is surrounded by the saturated steam, very high heat transfer is also expected with direct condensation. The inside of the Steam Injector is very complicated. To improve the efficiency of the Steam Injector, the water column behavior inside the Injector is visualized using the Dynamic PIV system. Dynamic PIV system consists of the high-speed camera and lasers. In this study, 384 x 180 pixel resolution with 30,000 fps camera is used to visualize the flow. For the illumination CW green laser with 300 mW is applied. To view inside the Injector, relay lens system is set at the Injector wall. Very high speed water column during the starting up of Steam Injector had been clearly visualized with 30,000 fps. The wave velocity on the water column had been analyzed using PIV technique. The instability of the water column is also detected. (authors)

  20. Exergetic analysis of a steam power plant using coal and rice straw in a co-firing process

    Energy Technology Data Exchange (ETDEWEB)

    Restrepo, Alvaro; Miyake, Raphael Guardini; Bazzo, Edson [Federal University of Santa Catarina (UFSC), Dept. of Mechanical Engineering, Florianopolis, SC (Brazil)], e-mails: arestrep@labcet.ufsc.br, miyake@labcet.ufsc.br, ebazzo@emc.ufsc.br; Bzuneck, Marcelo [Tractebel Energia S.A., Capivari de Baixo, SC (Brazil). U.O. Usina Termeletrica Jorge Lacerda C.], e-mail: marcelob@tractebelenergia.com.br

    2010-07-01

    This paper presents an exergetic analysis concerning an existing 50 M We steam power plant, which operates with pulverized coal from Santa Catarina- Brazil. In this power plant, a co-firing rice straw is proposed, replacing up to 10% of the pulverized coal in energy basis required for the boiler. Rice straw has been widely regarded as an important source for bio-ethanol, animal feedstock and organic chemicals. The use of rice straw as energy source for electricity generation in a co-firing process with low rank coal represents a new application as well as a new challenge to overcome. Considering both scenarios, the change in the second law efficiency, exergy destruction, influence of the auxiliary equipment and the greenhouse gases emissions such as CO{sub 2} and SO{sub 2} were considered for analysis. (author)

  1. An interation of lifetime monitoring of steam generators in power control systems; Integration der Lebensdauerueberwachung von Dampferzeugern in die Kraftwerksleittechnik

    Energy Technology Data Exchange (ETDEWEB)

    Kunze, Ulrich; Pels Leusden, Christoph; Spinner, Ralf [Siemens AG, Erlangen (Germany). Energy Sector; Hackstein, Holger [Siemens AG, Offenbach am Main (Germany). Energy Sector; Walz, Horst [Siemens AG, Karlsruhe (Germany). Energy Sector

    2008-07-01

    The substantial cost-relevant requirements of the operation of power stations are a highly flexible operation, efficient maintenance, a high efficiency and a high availability. Computer-assisted procedures are indispensable for the continuous monitoring of lifetime consumption and for the condition-dependent maintenance of the boiler. The fatigue monitoring system (FMS) offers all possibilities of the control system. The authors of the contribution under consideration report on an integration of life time monitoring of steam generators into the power station control technology. The technical fundamentals for the computation of the boiler lifetime as well as the fundamentals of integration philosophy and their conversion are presented. Subsequently, a configuration exemplarily is presented, and its results are described.

  2. Chemical cleaning of nuclear (PWR) steam generators

    International Nuclear Information System (INIS)

    Welty, C.S. Jr.; Mundis, J.A.

    1982-01-01

    This paper reports on a significant research program sponsored by a group of utilities (the Steam Generator Owners Group), which was undertaken to develop a process to chemically remove corrosion product deposits from the secondary side of pressurized water reactor (PWR) power plant steam generators. Results of this work have defined a process (solvent system and application methods) that is capable of removing sludge and tube-to-tube support plate crevice corrosion products generated during operation with all-volatile treatment (AVT) water chemistry. Considers a plant-specific test program that includes all materials in the steam generator to be cleaned and accounts for the physical locations (proximity and contact) of those materials. Points out that prior to applying the process in an operational unit, the utility, with the participation of the NSSR vendor, must define allowable total corrosion to the materials of construction of the unit

  3. Financing the electric power utilities, especially the nuclear power in Japan

    International Nuclear Information System (INIS)

    Tajima, T.

    1975-04-01

    Electric power demands in Japan have shown a remarkable growth at an annual rate of 12% since 1965. Nine electric power companies have invested large amounts of money so far, amounting to over 1 trillion yen every year since 1972. A survey of the electric power supply system and an estimation of the electric power demands in 1980 and in 1985 are given. It is expected that the main portion of electric power in the future will gradually be generated by nuclear plants. Financial features of the electrical power utilities, the credit risk of the electric power utilities, and the raising of funds by electric power utilities are discussed. It is concluded that it will be necessary (1) to expand the capital market, (2) to enable the electric power companies to issue a sufficient amount of bonds, (3) to make the Government financing institutions, such as the Japan Development Bank, provide the electric power companies with larger funds on a long-term and low-interest rate basis, and (4) even to take such drastic steps as subsidizing interest on private loans to the electric power companies. (B.P.)

  4. Steam generators - problems and prognosis

    International Nuclear Information System (INIS)

    Tapping, R.L.

    1997-05-01

    Steam-generator problems, largely a consequence of corrosion and fouling, have resulted in increased inspection requirements and more regulatory attention to steam-generator integrity. In addition, utilities have had to develop steam-generator life-management strategies, including cleaning and replacement, to achieve design life. This paper summarizes the pertinent data to 1993/1994, and presents an overview of current steam-generator management practices. (author)

  5. SG (steam generators) reliability project builds on Owners Group successes

    International Nuclear Information System (INIS)

    Green, S.

    1988-01-01

    In 1987, a five-year Steam Generator Reliability Project was established at the Electric Power Research Institute (EPRI) to deal with outstanding issues, following on from work initiated by the previous utility industry groupings (Steam Generator Owners Groups I and II). The work done by these groups is discussed and a listing of the major objectives of the new project is provided. (U.K.)

  6. Utilizing Solar Power Technologies for On-Orbit Propellant Production

    Science.gov (United States)

    Fikes, John C.; Howell, Joe T.; Henley, Mark W.

    2006-01-01

    The cost of access to space beyond low Earth orbit may be reduced if vehicles can refuel in orbit. The cost of access to low Earth orbit may also be reduced by launching oxygen and hydrogen propellants in the form of water. To achieve this reduction in costs of access to low Earth orbit and beyond, a propellant depot is considered that electrolyzes water in orbit, then condenses and stores cryogenic oxygen and hydrogen. Power requirements for such a depot require Solar Power Satellite technologies. A propellant depot utilizing solar power technologies is discussed in this paper. The depot will be deployed in a 400 km circular equatorial orbit. It receives tanks of water launched into a lower orbit from Earth, converts the water to liquid hydrogen and oxygen, and stores up to 500 metric tons of cryogenic propellants. This requires a power system that is comparable to a large Solar Power Satellite capable of several 100 kW of energy. Power is supplied by a pair of solar arrays mounted perpendicular to the orbital plane, which rotates once per orbit to track the Sun. The majority of the power is used to run the electrolysis system. Thermal control is maintained by body-mounted radiators; these also provide some shielding against orbital debris. The propellant stored in the depot can support transportation from low Earth orbit to geostationary Earth orbit, the Moon, LaGrange points, Mars, etc. Emphasis is placed on the Water-Ice to Cryogen propellant production facility. A very high power system is required for cracking (electrolyzing) the water and condensing and refrigerating the resulting oxygen and hydrogen. For a propellant production rate of 500 metric tons (1,100,000 pounds) per year, an average electrical power supply of 100 s of kW is required. To make the most efficient use of space solar power, electrolysis is performed only during the portion of the orbit that the Depot is in sunlight, so roughly twice this power level is needed for operations in sunlight

  7. Steam generator tube performance. Experience with water-cooled nuclear power reactors during 1985

    International Nuclear Information System (INIS)

    Tatone, O.S.; Tapping, R.L.

    1988-12-01

    The performance of steam generator tubes at water-cooled reactors during 1985 has been reviewed. Seventy-three of 168 reactors in the survey experienced tube degradation sufficient for the tubes to be plugged. The number of tubes plugged was 6837 or 0.28% of those in service. The leading cause of tube failure was stress corrosion cracking from the primary side. Stress corrosion cracking or intergranular attack from the secondary side and pitting were also major causes of tube failure. Unlike most previous years, fretting was a substantial problem at some reactors. Overall, corrosion continued to account for more than 80% of the defects. 20 refs

  8. Passive cooling applications for nuclear power plants using pulsating steam-water heat pipes

    International Nuclear Information System (INIS)

    Aparna, J.; Chandraker, D.K.

    2015-01-01

    Gen IV reactors incorporate passive principles in their system design as an important safety philosophy. Passive safety systems use inherent physical phenomena for delivering the desired safe action without any external inputs or intrusion. The accidents in Fukushima have renewed the focus on passive self-manageable systems capable of unattended operation, for long hours even in extended station blackout (SBO) and severe accident conditions. Generally, advanced reactors use water or atmospheric air as their ultimate heat sink and employ passive principles in design for enhanced safety. This paper would be discussing the experimental results on pulsating steam water heat-pipe devices and their applications in passive cooling. (author)

  9. Programs of monitoring of the steam generators of EdF nuclear power plants

    International Nuclear Information System (INIS)

    2001-01-01

    This decision from the French authority of nuclear safety (ASN) modifies the decision DSIN/GRE-BCCN no 000632 from October 31, 2000 concerning the preventive maintenance programs of the steam generators of Electricite de France (EdF) reactors. The main themes of the previous decision are not changed, i.e. the improvement of circumferential crack detection means, the reinforcement of the external skin control of tubes and the correction of vibrational instabilities for a given family of tubes. The modification concerns only the paragraph 2.b relative to the internal crack control of the 600 MA alloy tubes in the rolling transition zone. This paragraph is abrogated. (J.S.)

  10. Theoretical-empirical model of the steam-water cycle of the power unit

    Directory of Open Access Journals (Sweden)

    Grzegorz Szapajko

    2010-06-01

    Full Text Available The diagnostics of the energy conversion systems’ operation is realised as a result of collecting, processing, evaluatingand analysing the measurement signals. The result of the analysis is the determination of the process state. It requires a usageof the thermal processes models. Construction of the analytical model with the auxiliary empirical functions built-in brings satisfyingresults. The paper presents theoretical-empirical model of the steam-water cycle. Worked out mathematical simulation model containspartial models of the turbine, the regenerative heat exchangers and the condenser. Statistical verification of the model is presented.

  11. Utilities Power Change: Engaging Commercial Customers in Workplace Charging

    Energy Technology Data Exchange (ETDEWEB)

    Lommele, S. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Dafoe, W. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-05-31

    Using electricity to power vehicles can help advance energy security and reduce emissions, and also presents a new market opportunity for utilities looking to diversify and offer an added benefit to commercial customers. By providing plug-in electric vehicle (PEV) charging stations for their employees, commercial customers can help attract and retain a cutting-edge workforce. These employers also signal a commitment to sustainability and demonstrate progressive leadership and a willingness to adopt advanced technology.

  12. Bulk power system performance issues affecting utility peaking capacity additions

    Energy Technology Data Exchange (ETDEWEB)

    Garrity, T.F. [GE Power Sytems, Schenectady, NY (United States)

    1994-12-31

    This paper presents a discussion of transmission system constraints and problems that affect the siting and rating of peaking capacity additions. Techniques for addressing and modifying these concerns are presented. Particular attention is paid to techniques that have been successfully used by utilities to improve power transfer and system loadability, while avoiding the construction of additional transmission lines. Proven techniques for dealing with thermal, short-circuit level and stability issues are presented.

  13. Technical study of real-time simulation system for digital I and C system of steam generator in nuclear power plant

    International Nuclear Information System (INIS)

    Shi Ji; Jiang Mingyu; Ma Yunqin

    2004-01-01

    The real-time simulation system, which forms a interactive closed circle together with the steam generator control system, has been developed using a dynamic mathematical model of steam generator in this paper. It can provide a simulation target for upgrades of digital Instrument and Control system in Nuclear Power Plant (NPP) and is applicable for further research of control schemes. With this program, the authors have studied and analyzed the response of transient parameters to some different disturbance, the calculated results are in good agreement with those calculated by NPP simulator program. This will give a theoretical analysis for upgrades of digital I and C system in nuclear power plant

  14. Utilization of acetone-butanol-ethanol-water mixture obtained from biomass fermentation as renewable feedstock for hydrogen production via steam reforming: Thermodynamic and energy analyses.

    Science.gov (United States)

    Kumar, Brajesh; Kumar, Shashi; Sinha, Shishir; Kumar, Surendra

    2018-08-01

    A thermodynamic equilibrium analysis on steam reforming process to utilize acetone-butanol-ethanol-water mixture obtained from biomass fermentation as biorenewable fuel has been performed to produce clean energy carrier H 2 via non-stoichiometric approach namely Gibbs free energy minimization method. The effect of process variables such as temperature (573-1473 K), pressure (1-10 atm), and steam/fuel molar feed ratio (F ABE  = 5.5-12) have been investigated on equilibrium compositions of products, H 2 , CO, CO 2 , CH 4 and solid carbon. The best suitable conditions for maximization of desired product H 2 , suppression of CH 4 , and inhibition of solid carbon are 973 K, 1 atm, steam/fuel molar feed ratio = 12. Under these conditions, the maximum molar production of hydrogen is 8.35 with negligible formation of carbon and methane. Furthermore, the energy requirement per mol of H 2 (48.96 kJ), thermal efficiency (69.13%), exergy efficiency (55.09%), exergy destruction (85.36 kJ/mol), and generated entropy (0.29 kJ/mol.K) have been achieved at same operating conditions. Copyright © 2018 Elsevier Ltd. All rights reserved.

  15. Study of factors governing US utility nuclear power decisions

    International Nuclear Information System (INIS)

    1980-05-01

    Under DOE contract No. DE-AC02-79ET34009, The S.M. Stoller Corporation has conducted a study of US utility attitudes toward nuclear power. In the course of this study SMSC carried out a utility survey the objectives of which were: (1) to identify and rank in importance the governing considerations in actions taken in the past three years to cancel or defer nuclear projects, and (2) to gain insight into the circumstances and attitudes likely to govern new base-load commitments over the next several years. During the survey, contacts were made at the senior management level with utilities representing approximately half of the country's total electric capacity and two-thirds of its present nuclear commitment. Analysis of the responses led to the conclusion that most, if not all, of the decisions reached by the respondent utilities in the past several years to cancel or defer nuclear projects were triggered by one or a combination of the following four considerations: financial constraints; reduction in expected system load growth; schedule delay in licensing and construction and/or unpredictability; and adverse state government policies or attitudes regarding nuclear power

  16. Steaming ahead

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    An example of the development of geothermal power in Indonesia is described. Wells are being drilled into the Salak volcano on Java, about 60km south of Jakarta. These let out high pressure hot water trapped 1 to 3km below the surface which can be flashed into steam for driving turbines. The hot water field has already produced 110MW of power since 1994 and is currently being expanded to 330MW. Some details of the drilling and civil engineering are given. Since Indonesia sits on the edge of giant tectonic boundary known as the ''Pacific ring of fire'', the potential for further development is enormous. Ultimately volcanic activity could release an estimated 27,000MW capacity. More realistically, 2,000MW of crustal power by 2020 is spoken of. (UK)

  17. Influence of the type of working fluid in the lower cycle and superheated steam parameters in the upper cycle on effectiveness of operation of binary power plant

    Directory of Open Access Journals (Sweden)

    Stachel Aleksander A.

    2015-03-01

    Full Text Available In the paper presented have been the results of the analysis of effectiveness of operation of binary power plant consisting of combined two Clausius-Rankine cycles, namely the binary cycle with water as a working fluid in the upper cycle and organic substance as a working fluid in the lower cycle, as well as a single fluid component power plant operating also in line with the C-R cycle for superheated steam, with water as a working fluid. The influence of the parameters of superheated steam in the upper cycle has been assessed as well as the type of working fluid in the lower cycle. The results of calculations have been referred to the single-cycle classical steam power plant operating at the same parameters of superheated steam and the same mass flow rate of water circulating in both cycles. On the basis of accomplished analysis it has been shown that the binary power plant shows a greater power with respect to the reference power plant.

  18. Development of HV power transmission technology. Electric power supply until first world war; Entwicklung der Hochspannungsuebertragungstechnik. Die Elektroenergieversorgung bis zum Ersten Weltkrieg

    Energy Technology Data Exchange (ETDEWEB)

    Dittmann, Frank [Deutsches Museum, Muenchen (Germany)

    2009-11-02

    Story of power supply from 1880 to 1935 in Germany starting first with light centers, first public plants for power utilization followed by steam power plants and erection of overhead power lines. (GL)

  19. Thermodynamic Analysis of a Steam Power Plant with Double Reheat and Feed Water Heaters

    Directory of Open Access Journals (Sweden)

    M. M. Rashidi

    2014-03-01

    Full Text Available A steam cycle with double reheat and turbine extraction is presented. Six heaters are used, three of them at high pressure and the other three at low pressure with deaerator. The first and second law analysis for the cycle and optimization of the thermal and exergy efficiencies are investigated. An exergy analysis is performed to guide the thermodynamic improvement for this cycle. The exergy and irreversibility analyses of each component of the cycle are determined. Effects of turbine inlet pressure, boiler exit steam temperature, and condenser pressure on the first and second laws' efficiencies are investigated. Also the best turbine extraction pressure on the first law efficiency is obtained. The results show that the biggest exergy loss occurs in the boiler followed by the turbine. The results also show that the overall thermal efficiency and the second law efficiency decrease as the condenser pressure increases for any fixed outlet boiler temperature, however, they increase as the boiler temperature increases for any condenser pressure. Furthermore, the best values of extraction pressure from high, intermediate, and low pressure turbine which give the maximum first law efficiencies are obtained based on the required heat load corresponding to each exit boiler temperature.

  20. EVALUATION OF EYE LENS DOSE TO WORKERS IN THE STEAM GENERATOR AT THE KOREAN OPTIMIZED POWER REACTOR 1000.

    Science.gov (United States)

    Maeng, Sung Jun; Kim, Jinhwan; Cho, Gyuseong

    2018-03-15

    ICRP (2011) revised the dose limit to the eye lens to 20 mSv/y based on a recent epidemiological study of radiation-induced cataracts. Maintenance of steam generators at nuclear power plants is one of the highest radiation-associated tasks within a non-uniform radiation field. This study aims to evaluate eye lens doses in the steam generators of the Korean OPR1000 design. The source term was characterized based on the CRUD-specific activity, and both the eye lens dose and organ dose were simulated using MCNP6 combined with an ICRP voxel phantom and a mesh phantom, respectively. The eye lens dose was determined to be 5.39E-02-9.43E-02 Sv/h, with a negligible effect by beta particles. As the effective dose was found to be 0.81-1.21 times the lens equivalent dose depending on the phantom angles, the former can be used to estimate the lens dose in the SG of the OPR1000 for radiation monitoring purposes.

  1. Dynamic Simulation of the Water-steam System in Once-through Boilers - Sub-critical Power Boiler Case -

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Seongil; Choi, Sangmin [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2017-05-15

    The dynamics of a water-steam system in a once-through boiler was simulated based on the physics-based modeling approach, representing the system in response to large load change or scale disturbance simulations. The modeling considered the mass, energy conservation, and momentum equation in the water pipe and the focus was limited to the sub-critical pressure region. An evaporator tube modeling was validated against the reference data. A simplified boiler system consisting of economizer, evaporator, and superheater was constructed to match a 500 MW power boiler. The dynamic response of the system following a disturbance was discussed along with the quantitative response characteristics. The dynamic response of the boiler system was further evaluated by checking the case of an off-design point operation of the feedwater-to-fuel supply ratio. The results re-emphasized the significance of controlling the feedwater-to-fuel supply ratio and additional design requirements of the water-steam separator and spray attemperator.

  2. Dynamic Simulation of the Water-steam System in Once-through Boilers - Sub-critical Power Boiler Case -

    International Nuclear Information System (INIS)

    Kim, Seongil; Choi, Sangmin

    2017-01-01

    The dynamics of a water-steam system in a once-through boiler was simulated based on the physics-based modeling approach, representing the system in response to large load change or scale disturbance simulations. The modeling considered the mass, energy conservation, and momentum equation in the water pipe and the focus was limited to the sub-critical pressure region. An evaporator tube modeling was validated against the reference data. A simplified boiler system consisting of economizer, evaporator, and superheater was constructed to match a 500 MW power boiler. The dynamic response of the system following a disturbance was discussed along with the quantitative response characteristics. The dynamic response of the boiler system was further evaluated by checking the case of an off-design point operation of the feedwater-to-fuel supply ratio. The results re-emphasized the significance of controlling the feedwater-to-fuel supply ratio and additional design requirements of the water-steam separator and spray attemperator.

  3. The use of engineering features and schematic solutions of propulsion nuclear steam supply systems for floating nuclear power plant design

    International Nuclear Information System (INIS)

    Achkasov, A.N.; Grechko, G.I.; Pepa, V.N.; Shishkin, V.A.

    2000-01-01

    In recent years many countries and the international community represented by the IAEA have shown a notable interest in designing small and medium size nuclear power plants intended for electricity and heat generation for remote areas. These power plants can be also used for desalination purposes. As these nuclear plants are planned for use in areas without a well-developed power grid, the design shall account for their transportation to the site in complete preparedness for operation. Since the late 80s, the Research and Development Institute of Power Engineering (RDIPE) has carried out active efforts in designing reactor facilities for floating nuclear power plants. This work relies on the long-term experience of RDIPE engineers in designing the propulsion NSSS. Advantages can be gained from the specific engineering solutions that are already applied in the design of propulsion Nuclear Steam Supply System (NSSS) or from development of new designs based on the proven technologies. Successful implementation of the experience has been made easier owing to rather similar design requirements prescribed to ship-mounted NSSS and floating NPP. The common design targets are, in particular, minimization of mass and dimensions, resistance to such external impacts as rolling, heel and trim, operability in case of running aground or collision with other ships, etc. (author)

  4. Development and application of an efficient method for performing modal analysis of steam generator tubes in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Rhee, Huinam [Dept of Mechanical and Aerospace Engineering, Sunchon National University, Sunchon, 540-742 (Korea, Republic of); Boo, Myung-Hwan [Korea Hydro and Nuclear Power Company, Yuseong-Gu, Daejeon 305-343 (Korea, Republic of); Park, Chi-Yong [KEPCO Research Institute, Yuseong-Gu, Daejeon 305-380 (Korea, Republic of); Ryu, Ki-Wahn, E-mail: kwryu@chonbuk.ac.k [Department of Aerospace Engineering, Chonbuk National University, 664-14, Deogjin-Dong, Jeonju 561-756 (Korea, Republic of)

    2010-10-15

    with the FIV analysis program, it gives an amazing benefit, which makes the FIV analysis of all tubes possible within a limited time during the design or maintenance period. Using the developed program, the stability ratio regarding the fluid-elastic instability and the amplitude of vibration resulting from the turbulence flow excitation can be calculated for all tubes according the standard ASME Code, therefore, much more reliable design of the steam generator against the FIV related failures can be achieved. For an operating plant, there is a requirement that every single tube must be quantitatively checked whether wear would be more than 40% in thickness during the next operation period. If yes, the tube must be plugged to prevent severe failure including the tube wall penetration. In order to decide the tube plugging, which leads the plant performance degradation, the wear prediction is required. The wear prediction analysis needs wear data by ultrasonic testing and modal property data of tubes. PIAT-MODE will be a power tool enabling the wear prediction in a limited maintenance period by supplying modal data for all tubes.

  5. Plant life management optimized utilization of existing nuclear power plants

    International Nuclear Information System (INIS)

    Watzinger, H.; Erve, M.

    1999-01-01

    For safe, reliable and economical nuclear power generation it is of central importance to understand, analyze and manage aging-related phenomena and to apply this information in the systematic utilization and as-necessary extension of the service life of components and systems. An operator's overall approach to aging and plant life management which also improves performance characteristics can help to optimize plant operating economy. In view of the deregulation of the power generation industry with its increased competition, nuclear power plants must today also increasingly provide for or maintain a high level of plant availability and low power generating costs. This is a difficult challenge even for the newest, most modern plants, and as plants age they can only remain competitive if a plant operator adopts a strategic approach which takes into account the various aging-related effects on a plant-wide basis. The significance of aging and plant life management for nuclear power plants becomes apparent when looking at their age: By the year 2000 roughly fifty of the world's 434 commercial nuclear power plants will have been in operation for thirty years or more. According to the International Atomic Energy Agency, as many as 110 plants will have reached the thirty-year service mark by the year 2005. In many countries human society does not push the construction of new nuclear power plants and presumably will not change mind within the next ten years. New construction licenses cannot be expected so that for economical and ecological reasons existing plants have to be operated unchallengeably. On the other hand the deregulation of the power production market is asking just now for analysis of plant life time to operate the plants at a high technical and economical level until new nuclear power plants can be licensed and constructed. (author)

  6. Assessment and Management of Ageing of Major Nuclear Power Plant Components Important to Safety: Steam Generators. 2011 Update

    International Nuclear Information System (INIS)

    2011-11-01

    At present there are over four hundred forty operational nuclear power plants (NPPs) in IAEA Member States. Ageing degradation of the systems, structures of components during their operational life must be effectively managed to ensure the availability of design functions throughout the plant service life. From the safety perspective, this means controlling, within acceptable limits, the ageing degradation and wear-out of plant components important to safety so that adequate safety margins remain, i.e. integrity and functional capability in excess of normal operating requirements. This IAEA-TECDOC is one in a series of reports on the assessment and management of ageing of the major NPP components important to safety. The reports are based on experience and practices of NPP operators, regulators, designers, manufacturers, and technical support organizations. The current practices for the assessment of safety margins (fitness for service) and the inspection, monitoring and mitigation of ageing degradation of selected components of Canada deuteriumuranium (CANDU) reactor, boiling water reactor (BWR), pressurized water reactor (PWR), and water moderated, water cooled energy reactor (WWER) plants are documented in the reports. These practices are intended to help all involved directly and indirectly in ensuring the safe operation of NPPs, and also to provide a common technical basis for dialogue between plant operators and regulators when dealing with age related licensing issues. Since the reports are written from a safety perspective, they do not address life or life cycle management of the plant components, which involves the integration of ageing management and economic planning. The target audience of the reports consists of technical experts from NPPs and from regulatory, plant design, manufacturing and technical support organizations dealing with specific plant components addressed in the reports. The component addressed in the present publication is the steam

  7. The licensing procedure for the construction of power utilities

    International Nuclear Information System (INIS)

    Sturm, C.

    1987-01-01

    The requirement to obtain licences for plants constitutes a form of state control over the construction of power utilities. Under the Federal Pollution Law and the Atomic Energy Law, only the environmental compatibility of the planned plant is verified. Verifications according to the Law on the Fuel and Electricity Industries and the Federal Pollution Law, respectively the Atomic Energy Law and the Law on Power Generation from Coal are effected independently of one another by the different authorities. The granting of licences for the individual power plants may be subject to different laws in each instance. This paper covers only the licensing procedure under the Federal Pollution Law and the Atomic Energy Law. (orig./HSCH) [de

  8. Electric power bidding model for practical utility system

    Directory of Open Access Journals (Sweden)

    M. Prabavathi

    2018-03-01

    Full Text Available A competitive open market environment has been created due to the restructuring in the electricity market. In the new competitive market, mostly a centrally operated pool with a power exchange has been introduced to meet the offers from the competing suppliers with the bids of the customers. In such an open access environment, the formation of bidding strategy is one of the most challenging and important tasks for electricity participants to maximize their profit. To build bidding strategies for power suppliers and consumers in the restructured electricity market, a new mathematical framework is proposed in this paper. It is assumed that each participant submits several blocks of real power quantities along with their bidding prices. The effectiveness of the proposed method is tested on Indian Utility-62 bus system and IEEE-118 bus system. Keywords: Bidding strategy, Day ahead electricity market, Market clearing price, Market clearing volume, Block bid, Intermediate value theorem

  9. The economic value of accurate wind power forecasting to utilities

    Energy Technology Data Exchange (ETDEWEB)

    Watson, S J [Rutherford Appleton Lab., Oxfordshire (United Kingdom); Giebel, G; Joensen, A [Risoe National Lab., Dept. of Wind Energy and Atmospheric Physics, Roskilde (Denmark)

    1999-03-01

    With increasing penetrations of wind power, the need for accurate forecasting is becoming ever more important. Wind power is by its very nature intermittent. For utility schedulers this presents its own problems particularly when the penetration of wind power capacity in a grid reaches a significant level (>20%). However, using accurate forecasts of wind power at wind farm sites, schedulers are able to plan the operation of conventional power capacity to accommodate the fluctuating demands of consumers and wind farm output. The results of a study to assess the value of forecasting at several potential wind farm sites in the UK and in the US state of Iowa using the Reading University/Rutherford Appleton Laboratory National Grid Model (NGM) are presented. The results are assessed for different types of wind power forecasting, namely: persistence, optimised numerical weather prediction or perfect forecasting. In particular, it will shown how the NGM has been used to assess the value of numerical weather prediction forecasts from the Danish Meteorological Institute model, HIRLAM, and the US Nested Grid Model, which have been `site tailored` by the use of the linearized flow model WA{sup s}P and by various Model output Statistics (MOS) and autoregressive techniques. (au)

  10. Power Oscillation Damping Controller for Wind Power Plant Utilizing Wind Turbine Inertia as Energy Storage

    DEFF Research Database (Denmark)

    Knüppel, Thyge; Nielsen, Jørgen Nygård; Jensen, Kim Høj

    2011-01-01

    For a wind power plant (WPP) the upper limit for active power output is bounded by the instantaneous wind conditions and therefore a WPP must curtail its power output when system services with active power are delivered. Here, a power oscillation damping controller (POD) for WPPs is presented...... that utilizes the stored kinetic energy in the wind turbine (WT) mechanical system as energy storage from which damping power can be exchanged. This eliminates the need for curtailed active power production. Results are presented using modal analysis and induced torque coefficients (ITC) to depict the torques...... induced on the synchronous generators from the POD. These are supplemented with nonlinear time domain simulations with and without an auxiliary POD for the WPP. The work is based on a nonlinear, dynamic model of the 3.6 MW Siemens Wind Power wind turbine....

  11. Efficiency Evaluation of Construction of Steam-Turbine Power Plants at Industrial Enterprises

    Directory of Open Access Journals (Sweden)

    A. L. Starzhinsky

    2007-01-01

    Full Text Available It is shown that application of own power stations at an industrial enterprise is considered as an expedient one if there is an availability of thermal power sources because value of an optimization criterion exceeds corresponding optimization criterion by 2.1-4.6 fold when an enterprise is supplied with power only from power system networks.

  12. Chemical cleaning for sludge in steam generator of nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Mengqin; Lu Yucheng; Zhang Binyong; Yu Jinghua

    2002-01-01

    The sludge induced corrosion damage to secondary side of tubes of Steam Generator (SG), effect of chemical cleaning technique on maintenance integrity of tubes of SG NPP and use of chemical cleaning technique in SG NPP have been summarized. The engineering technique of chemical cleaning for removing sludge in secondary side of SG NPP has been studied and qualified by CIAE (China Institute of Atomic Energy). Chemical cleaning engineering technique is introduced (main agent is EDTA, temp. <100 degree C), including chemical cleaning technology for tube plate and full tube nest of secondary side of SG, the monitoring technique of chemical cleaning process (effectiveness and safety), the disposal method of wastage of chemical cleaning, the system of chemical cleaning. The method for preventing sludge deposition in secondary side and the research on advanced water chemistry of secondary loop are introduced

  13. Thermal stability of chloroform in the steam condensate cycle of CANDU-PHW nuclear power plant

    International Nuclear Information System (INIS)

    Lepine, Louis; Gilbert, Roland; Ouellet, Lorenzo

    1992-01-01

    Analysis of samples taken at the Gentilly 2 (Quebec) CANDU-PHW (CANadian Deuterium Uranium - Pressurized Heavy Water) plant after chlorination and demineralization revealed the presence of all four trihalomethanes (THMs) (CHCl 3 , CHBrCl 2 , CHBr 2 Cl and CHBr 3 ) and other unidentified halogenated volatile compounds. Among the THMs, chloroform was the major contaminant. A study of its thermal stability in water at different temperatures confirmed the degradation of the CHCl 3 molecule according to the equation CHCl 3 + H2O → CO + 3 HCl. The reaction follows first order kinetics and has an activation energy of 100 kJ/mol. The estimated half-life is six seconds at 260 deg C, the maximum temperature of the steam condensate cycle

  14. Modernization of the Nuclear Power Plant Krsko with new steam generators

    International Nuclear Information System (INIS)

    Holz, R.; Stach, U.; Gloaguen, C.

    2000-01-01

    The contract for the replacement of two steam generators at NPP Krsko was awarded in February 1998 to the Consortium SIEMENS AG FRAMATOME S.A.. The time frame for the replacement outage was scheduled from April to June 2000. The replacement itself started with the plant shut down on 15 th of April 2000 and the plant was back on line on 15 th of June, so that after an intensive engineering period of more than two years the plant was off line only 62 days, as scheduled. This document deals with the various aspects of the replacement phase itself and the techniques used. During the last years conference the engineering and licensing phase of the project have been presented. (author)

  15. Modernization of the Nuclear Power Plant Krsko with new steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Holz, R; Stach, U [Siemens AG, Erlangen, Offenbach (Germany); Gloaguen, C [Framatome, Paris (France)

    2000-07-01

    The contract for the replacement of two steam generators at NPP Krsko was awarded in February 1998 to the Consortium SIEMENS AG FRAMATOME S.A.. The time frame for the replacement outage was scheduled from April to June 2000. The replacement itself started with the plant shut down on 15{sup th} of April 2000 and the plant was back on line on 15{sup th} of June, so that after an intensive engineering period of more than two years the plant was off line only 62 days, as scheduled. This document deals with the various aspects of the replacement phase itself and the techniques used. During the last years conference the engineering and licensing phase of the project have been presented. (author)

  16. Survey of thorium utilization in power reactor systems

    International Nuclear Information System (INIS)

    Schwartz, M.H.; Schleifer, P.; Dahlberg, R.C.

    1976-01-01

    It is clear that thorium-fueled thermal power reactor systems based on current technology can play a vital role in serving present and long-term energy needs. Advanced thorium converters and thermal breeders can provide an expanded resource base from which the world's growing energy demands can be met. Utilization of a symbiotic system of fast breeders and thorium-fueled thermal reactors can be particularly effective in providing low cost power while conserving uranium resources. Breeder reactors are characterized by high capital costs and very low fuel costs since they produce more fuel than they consume. This excess fuel can be used to fuel thermal converter reactors whose capital costs are low. This symbiosis is optimized when 233 U is bred in the fast breeders and then used to fuel high-conversion-ratio thermal converter reactors operating on the thorium-uranium fuel cycle. The thorium-cycle HTGR, after undergoing more than fifteen years of development in both the United States and Europe, provides for the optimum utilization of our limited uranium resources. Other thermal reactor systems, previously operating on the uranium cycle, also show potential in their capability to utilize the thorium cycle effectively

  17. A facility for the testing and repair of primary collectors of steam generators at WWER nuclear power plants

    International Nuclear Information System (INIS)

    Herman, M.; Kuna, M.

    1990-01-01

    A facility labelled ZOKPG-1 has been developed for in-service inspection and repair of steam generator collectors in WWER-440 nuclear power plants. The facility makes possible visual, capillary, luminescence and ultrasonic inspection and eddy current testing of the internal surface, base material and welded joints of the collector. The repair modules of the ZOKPG-1 manipulator enable electroerosive elimination of surface defects of the material and local electrochemical decontamination of the internal surfaces. The manipulator can be operated at temperatures up to 40 degC, humidity up to 100%, and in conditions of radiation load up to 15 mGy/h and of surface contamination on the order of 100 Bq/cm 2 . (Z.M.). 16 figs

  18. Finite Element Modeling of Material Fatigue and Cracking Problems for Steam Power System HP Devices Exposed to Thermal Shocks

    Directory of Open Access Journals (Sweden)

    Pawlicki Jakub

    2016-09-01

    Full Text Available The paper presents a detailed analysis of the material damaging process due to low-cycle fatigue and subsequent crack growth under thermal shocks and high pressure. Finite Element Method (FEM model of a high pressure (HP by-pass valve body and a steam turbine rotor shaft (used in a coal power plant is presented. The main damaging factor in both cases is fatigue due to cycles of rapid temperature changes. The crack initiation, occurring at a relatively low number of load cycles, depends on alternating or alternating-incremental changes in plastic strains. The crack propagation is determined by the classic fracture mechanics, based on finite element models and the most dangerous case of brittle fracture. This example shows the adaptation of the structure to work in the ultimate conditions of high pressure, thermal shocks and cracking.

  19. Improved HYLIFE-II heat transport system and steam power plant: Impact on performance and cost of electricity

    International Nuclear Information System (INIS)

    Hoffman, M.A.; Lee, Ying T.

    1992-12-01

    The HYLIFE-II conceptual design has evolved and improved continually over the past four years to its present form. This paper describes the latest FY92 versions, Reference Case H1 (nominally 1 GWe net output) and the Enhanced Case HE (nominally 2 GWe net output), which take advantage of improvements in the tritium management system to eliminate the intermediate loop and the intermediate heat exchangers (IHX's). The improvements in the heat transport system and the steam power plant are described and the resulting cost reductions are evaluated. The new estimated cost of electricity (in 1990 dollars) is 6.6 cents/kWh for Reference Case H1 and 4.7 cents/kWh for the Enhanced Case

  20. The use of EDI to reduce the ammonia concentration in steam generators blowdown of PWR nuclear power plants

    International Nuclear Information System (INIS)

    Calay, J.C.; Goffin, C.

    2000-01-01

    To be recycled, PWR steam generator blowdown must be purified by mechanical filters, followed by ion exchangers (mixed bed preceded by a cationic ion exchange resin). The cationic ion exchange resin eliminates the conditioning agent ammonia in order to lengthen the cycles of the mixed bed. In the Doel nuclear power plant, Laborelec performed tests on a pilot plant for continuous electrodeionization that might replace the cation exchanger. The test campaign lasted six months. It is concluded that ammonia is removed well (1,000 μg/kg in the feed vs. 3 - 4 μg/kg in the product). The electrodeionization removes also other impurities; the conductivity of the treated water amounts to nearly 0.07 μs/cm

  1. Use of shot-peening to improve stress corrosion resistance of steam generator tubes of PWR nuclear power plants

    International Nuclear Information System (INIS)

    Michaut, B.; Slama, G.

    1985-11-01

    A shot-peening process has been developed for treating the internal side of thin tubes (1 to 1.3 mm) of which diameter is between 19 and 22 mm, used in steam generators of nuclear power plants; this process can be applied to irradiated media. Shot-peening effect has been characterised by stress profiles in depth (internal skin; measurement by X rays) and by induced stress profiles (external skin; stress gauge). The efficiency of the process (100%) has been established by corrosion testing on mockups, either in boiling MgCl 2 , or in caustic medium (10%) at 350 0 C under 180 bars of internal pressure. The process has been used with success on more than 20000 tubes and will be applied later at a larger scale in France and in foreign countries [fr

  2. Efficient energy utilization and environmental issues applied to power planning

    International Nuclear Information System (INIS)

    Campbell, Hector; Montero, Gisela; Perez, Carlos; Lambert, Alejandro

    2011-01-01

    This document shows the importance of policies for electric energy savings and efficient energy utilization in power planning. The contributions of economic, social, and environmental items were evaluated according to their financial effects in the delay of investments, reduction of production costs and decrement of environmental emissions. The case study is Baja California, Mexico; this system has a unique primary source: geothermal energy. Whether analyzing the planning as usual or planning from the supply side, the forecast for 2005-2025 indicates that 4500 MW additional installed capacity will be required (3-times current capacity), representing an investment that will emit 12.7 Mton per year of CO 2 to the atmosphere and will cost US$2.8 billion. Systemic planning that incorporates polices of energy savings and efficiency allows the reduction of investments and pollutant emissions. For example, a reduction of 20% in the growth trend of the electricity consumption in the industrial customers would save US$10.4 billion over the next 20 years, with a potential reduction of 1.6 Mton/year of CO 2 . The increase in geothermal power generation is also attractive, and it can be combined with the reduction of use and energy losses of utilities, which would save US$13.5 billion and prevent the discharge of 8.5 Mton/year of CO 2 . - Highlights: → We contrast power planning methods for supply electricity for economy development. → Importance of policies for electricity savings and efficient use in power planning. → Systemic planning facilitates decision-making process for electricity optimization. → Supply-side planning will cause climb in prices and loss of energy self-sufficiency. → Power planning should be immersed in an environment of appropriate energy policies.

  3. A system for regulating the pressure of resuperheated steam in high temperature gas-cooled reactor power stations

    International Nuclear Information System (INIS)

    Braytenbah, A.S.; Jaegines, K.O.

    1975-01-01

    The invention relates to a system for regulating steam-pressure in the re-superheating portion of a steam-boiler receiving heat from a gas-cooled high temperature nuclear reactor, provided with gas distributing pumps driven by steam-turbines. The system comprises means for generating a pressure signal of desired magnitude for the re-superheating portion, and means for providing a real pressure in the re-superheating portion, means (including a by-passing device) for generating steam-flow rate signal of desired magnitude, a turbine by-pass device comprising a by-pass tapping means for regulating the steam-flow-rate in said turbine according to the desired steam-flow rate signal and means for controlling said by-pass tapping means according to said desired steam-flow-rate signal [fr

  4. Steam turbines for the future

    International Nuclear Information System (INIS)

    Trassl, W.

    1988-01-01

    Approximately 75% of the electrical energy produced in the world is generated in power plants with steam turbines (fossil and nuclear). Although gas turbines are increasingly applied in combined cycle power plants, not much will change in this matter in the future. As far as the steam parameters and the maximum unit output are concerned, a certain consolidation was noted during the past decades. The standard of development and mathematical penetration of the various steam turbine components is very high today and is applied in the entire field: For saturated steam turbines in nuclear power plants and for steam turbines without reheat, with reheat and with double reheat in fossil-fired power plants and for steam turbines with and without reheat in combined cycle power plants. (orig.) [de

  5. Utilization of oil shale in power plants and environmental protection; Polevkivienergeetika ja keskkonna saastumine

    Energy Technology Data Exchange (ETDEWEB)

    Ots, A [Tallinn Technical Univ. (Estonia)

    1994-04-01

    Estonia n oil shale was first used as a power fuel in 1924 at the Tallinn Power Plant. The first pulverized oil-shale-fired steam boilers were used in the end of forties. A new period in the utilization of the Estonia n oil shale began in the years of 1959-1960, when the first power units were applied at the Baltic Thermal Power Plant. The project capacity of the plant was 1600 MW. In the 1973 the Estonia n thermal Power Plant was put into operation with the capacity of 1610 MW. The output of the electric power generated by oil.shale power plants in 1989, was 17.4 TWh; the maximum output was achieved in 1979 - 19.1 TWh. In 1989, the amount of the Estonia n oil shale consumed to generate electric power was equal to 22.3{center_dot}10{sup 6}t. On burning oil shale the main atmospheric pollutants are the following: nitrogen oxides, sulphur oxides, and fly ash. The concentration of nitrogen oxide in the oil-shale flue gas leaving the chimney, expressed as nitrogen dioxide by an excess air factor 1.5, is in the range of 0.15-0.20 g/m{sup 3.} The total emission of nitrogen oxide into the atmosphere is approximately 15-20 thousand ton per year. the concentration of sulphur dioxide in the oil-shale flue gas leaving the boiler by an excess air factor 1.5 in the range of 1.0-1.8 g/m{sup 3.} the total emission of sulphur dioxide into atmosphere is in range of 140-160 thousand per year. As the oil-shale ash contains a large amount of the components capable of combining with sulphur in furnace and in boiler gas passes, the sulphur binding effect from ash is high, and it is in the range of 0.75-0.85. The boilers in oil-shale power plants are equipped with two-stage ash separation systems: cyclone and electrostatic al precipitators. The fly ash concentration in oil shale flue gas after electrostatic al precipitators by excess air factor 1.5 is 1-2 g/m{sup 3.} (author).

  6. Utilization of waste heat from nuclear power plants in agriculture

    International Nuclear Information System (INIS)

    Horacek, P.

    1981-01-01

    The development of nuclear power will result in the relative and absolute increase in the amount of waste heat which can be used in agriculture for heating greenhouses, open spaces, for fish breeding in heated water, for growing edible mushrooms, growing algae, for frost protection of orchards, air conditioning of buildings for breeding livestock and poultry, and for other purposes. In addition of the positive effect of waste heat, the danger increases of disease, weeds and pests. Pilot plant installations should be build in Czechoslovakia for testing the development of waste heat utilization. (Ha)

  7. Threats and opportunities facing the power utility industry

    International Nuclear Information System (INIS)

    Read, W.S.

    1996-01-01

    This address describes how, throughout the world, technological, ideological, and economic forces are reshaping the way one works and does business. The electric power industry, one of the last bastions of conservatism, has awakened to the fact that it, too, is not immune to the pressure for change. It realizes that it cannot afford to bury its head in the sand when confronted with this challenge. This awakening will provide utilities with the stimulus needed to be innovative and cooperative, in partnership with their customers, in their response to this new business opportunity

  8. Safety provisions for steam generator in Mochovce nuclear power plant. BO CI 04 Integrity of primary collectors of VVER 440 steam generators

    International Nuclear Information System (INIS)

    Cikryt, F.; Bednarek, L.; Matocha, K.; Vejvoda, S.

    1997-01-01

    This paper dealt with the identification of possible damaging mechanism of the collector of the WWER 440 steam generator, cracking of primary collectors, corrosion damage of the protective coat of the primary collector circumferential weld, cracking of breathing space in the region of blinding effect by corrosion and strain, leaking of disassembling joint of the primary collector lid and with the integrity of heat exchanging tubes

  9. Coping with nuclear power risks: the electric utility incentives

    International Nuclear Information System (INIS)

    Starr, C.; Whipple, C.

    1982-01-01

    The financial risks associated with nuclear power accidents are estimated by interpolating between frequency-vs.-severity data from routine outages and the frequency-vs.-severity estimates from the Nuclear Regulatory Commission's (NRC's) Reactor Safety Study (WASH-1400). This analysis indicates that the expected costs of plant damage and lost power production are large compared to the public risks estimated in WASH-1400, using values from An Approach to Quantitative Safety Goals for Nuclear Power Plants (NUREG-0739), prepared by the NRC Advisory Committee on Reactor Safeguards. Analyses of the cost-effectiveness of accident-prevention investments that include only anticipated public safety benefits will underestimate the value of such investments if reductions in power plant damage risk are not included. The analysis also suggests that utility self-interest and the public interest in safety are generally coincident. It is argued that greater use could be made of this self-interest in regulation if the relationship between the NRC and the industry were more cooperative, less adversary in nature

  10. Utilization of steam- and explosion-decompressed aspen wood by some anaerobes. [Acetivibrio cellulolyticus, Clostridium saccharolyticum, Zymomonas anaerobia

    Energy Technology Data Exchange (ETDEWEB)

    Khan, A W; Asther, M; Giuliano, C

    1984-01-01

    Tests made to study the suitability of using steam- and explosion-decompressed aspen wood as substrate in anaerobic fermentations indicated that after washing with dilute NaOH it becomes over 80% accessible to both mesophilic and thermophilic cellulolytic anaerobes and cellulases, compared with delignified, ball-milled pulp. After washing, this material was also found to be suitable for the single-step conversion of cellulose to ethanol using cocultures consisting of cellylolytic and ethanol-producing saccharolytic anaerobes; and without and after washing by the use of cellulolytic enzymes and ethanologenic anaerobes. 16 references, 3 tables.

  11. Method of determining the enthalpy and moisture content of wet steam

    International Nuclear Information System (INIS)

    Silvestri, G.J. Jr.

    1991-01-01

    This patent describes a nuclear powered multi-stage steam turbine system wherein steam at higher than atmospheric pressure is introduced into the turbine system at a high pressure turbine element and thereafter flows through a series of turbine elements at successively decreasing pressures, wherein portions of the steam are extracted from the turbine elements at a plurality of lower pressure points and the steam is finally exhausted at a lowest pressure point, the method of determining moisture content and enthalpy of steam at a selected pressure point. It comprises sampling a small quantity of steam at the selected pressure point; super heating the steam sample to a single-phase state by reducing its pressure and bottling it in a closed measuring chamber whereby the flow energy of the sample is converted into internal energy; measuring the pressure of the steam sample within the chamber; determining the sonic velocity of the steam sample by passing a sound wave through the sample from a transmitter to a receiver located at a known distance from the transmitter and measuring the time required for the sound wave to travel from transmitter to receiver; and utilizing the measured pressure and sonic velocity of the steam sample to calculate the moisture content and enthalpy of the steam at the selected pressure point

  12. Investigation and evaluation of erosion-corrosion status of the secondary side steam-water system at Paks Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Schunk, J.; Patek, G.; Pinter, T.; Baracska Varju, I.; Doma, A.; Kovacs, A.; Nemeth, P.; Tilky, P. [Paks Nuclear Power Plant Ltd (Hungary); Osz, J. [Budapest Univ. of Science and Economy (Hungary)

    2009-07-01

    There were four identical VVER-440 type units installed at Paks Nuclear Power Plant with 440 MW electrical capacity of each, between 1982 and 1987. Based on inherent reserve capacity of these units, the operational and maintenance experiences and examples of power upgrading abroad it was decided to increase the power of our units in a stepwise way. Presently, this upgrading project is close to finalization resulting in 500 MW electrical capacity of each unit. To realize the planned electrical power increase it was necessary to increase the primary and secondary heat power, which requested the increase of mass flow, temperature and pressure of secondary coolant flowing through the steam generators. According to the preliminary expert evaluations these increased parameters would not cause such an increase in humidity of steam leaving the turbine houses that could adversely impair our long term power upgrading plans. The steam humidity was determined on our units and the values did not even exceed the original design values. In spite of these preliminary investigations, significant accumulation of erosion-corrosion products at different places of secondary circuit was found and erosion damages of some secondary side equipment were discovered as a probable consequence of power upgrading. An extensive evaluation programme has been started involving experts and institutes of material testing, chemistry and hydrodynamics. Results and details of that work are given in our presentation. (authors)

  13. Control of the thermostressed state of low-pressure cylinder rotors for power steam turbines

    International Nuclear Information System (INIS)

    Lejzerovich, A.Sh.

    1980-01-01

    The principle arrangement of an analog device for operation control of the low pressure cylinder (LPC) heating at large steam turbine start-up has been developed. Different forms of representation of the thermal conductivity equation used for realization by means of analog models are analized. Presented are the results of calculating the heating indices for the welded rotor of LPC during the turbine start-up from a cold state and the curves of temperature distribution in the disc of the first sections of welded LPC rotor at start-up from a cold state and in a steady-state regime. The results obtained show that in the process of start-up the error of the temperature difference DELTAt determination according to the suggested scheme does not exceed 10 deg C. After achieving the maximum of DELTAt in the process of the rotor temperature field flattening, this error increases and constitutes 32 deg C in steady-state regime, mainly, due to the error of temperature determination on the rotation axis in controlled cross section. As far as the control for the LPC rotor heating is necessary only during start-up and the requirements for its accuracy are not equivalent, therefore, for all regimes, representativity and accuracy of control provided by the accepted calculation scheme is quite satisfactory

  14. Thermionic combustor application to combined gas and steam turbine power plants

    International Nuclear Information System (INIS)

    Miskolczy, G.; Wang, C.C.; Lieb, D.P.

    1981-01-01

    A design for the insertion of thermionic converters into the wall of a conventional combustor to produce electricity in a topping cycle is described, and a study for applications in gas and steam generators of 70 and 30 MW is evaluated for engineering and economic feasibility. Waste heat from the thermionic elements is used to preheat the combustor air, the heat absorbed by the elements plus further quenching of the exhaust gases with ammonia is projected to reduce NO(x) emissions to acceptable levels. Schematics, flow diagrams, and components of a computer model for cost projections are provided. It was found that temperatures around the emitters must be maintained above 1,600 K, with maximum efficiency and allowable temperature at 1,800 K, while collectors generate maximally at 950 K, with a corresponding work function of 1.5 eV. Cost sensitive studies indicate an installed price of $475/kW for the topping cycle, with improvements in thermionic converter characteristics bringing the cost to $375/kW at a busbar figure of 500 mills/kWh

  15. Current steel forgings and their properties for steam generator of nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, Tomoharu; Murai, Etsuo; Sato, Ikuo [Japan Steel Works Ltd., Muroran, Hokkaido (Japan). Muroran Plant; Suzuki, Kimiaki; Kusuhashi, Mikio; Tsukada, Hisashi [Japan Steel Works Ltd., Tokyo (Japan)

    2001-06-01

    On the steel forging (SF) elements for steam generator (SG) of the pressurized water type light water reactor (PWR), from a viewpoint of upgrading in their improvements of design and materials, here were described on three materials such as integrated steel forgings, high strength steel forgings, and vacuum carbon deoxidisation (VCD) steel forgings. On production of SG, by using the integrated SF, not only structural soundness of SG is upgraded, but also inspections containing inspections under production and usage become easier, to bring minimization of maintenance inspection and reduction of exposure under operation. And, in order to reduce weight of SG and upgrade seismic resistance, SA508, a Cl.3a high strength SF (620 MPa class in tensile strength) is used for some nuclear plants. Here were introduced material properties of this SF and described its chemical components and heat treatment condition. And, as a method to reduce macro- and micro-segregation of materials and to upgrade homogeneity of material property, a method combined deoxidisation of steel due to carbon monoxide reaction with crystal grain minimization due to addition of aluminum was investigated. In addition, properties of a low Si-SA508 Cl.3 steel using this method was compared with that of usual SA508 Cl.3 steel. (G.K.)

  16. Thermionic combustor application to combined gas and steam turbine power plants

    Science.gov (United States)

    Miskolczy, G.; Wang, C. C.; Lieb, D. P.; Margulies, A. E.; Fusegni, L. J.; Lovell, B. J.

    A design for the insertion of thermionic converters into the wall of a conventional combustor to produce electricity in a topping cycle is described, and a study for applications in gas and steam generators of 70 and 30 MW is evaluated for engineering and economic feasibility. Waste heat from the thermionic elements is used to preheat the combustor air; the heat absorbed by the elements plus further quenching of the exhaust gases with ammonia is projected to reduce NO(x) emissions to acceptable levels. Schematics, flow diagrams, and components of a computer model for cost projections are provided. It was found that temperatures around the emitters must be maintained above 1,600 K, with maximum efficiency and allowable temperature at 1,800 K, while collectors generate maximally at 950 K, with a corresponding work function of 1.5 eV. Cost sensitive studies indicate an installed price of $475/kW for the topping cycle, with improvements in thermionic converter characteristics bringing the cost to $375/kW at a busbar figure of 500 mills/kWh.

  17. Characteristics Testing of the ECT Bobbin Probe for Steam Generator Tube Inspection of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Nam, Min Woo; Lee, Hee Jong; Cho, Chan hee; Yoo, Hyun Joo

    2010-01-01

    The steam generator management program(SGMP) has recently defined the procedures for the qualification of eddy current hardware and technique. These procedures provide two basic methods for qualification. The first way is to qualify the equipment or the probe by using the flaw mechanism and method of the pulled tubes from the heat exchangers or the artificial flawed tubes. The second way is to verify the equivalency with the characteristics of the qualified equipment or probe. In this case, the qualified equipment or probe may be modified to substitute or replace instruments or probes without re-qualification provided that the range of essential variables defined in the examination technique specification sheet are met. This study is to describe the result of the comparative performance evaluation of bobbin coil eddy current probes manufactured by KEPCO Research Institute and probes manufactured by a foreign manufacturer. As a result of this study, although there were minor differences between the two kinds of probes, it was evaluated that the two kinds of probes were almost identical in the significant performance characteristics described in the KEPCO Research Institute guideline

  18. Characteristics Testing of the ECT Bobbin Probe for Steam Generator Tube Inspection of Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Nam, Min Woo; Lee, Hee Jong; Cho, Chan hee; Yoo, Hyun Joo [KEPCO, Daejeon (Korea, Republic of)

    2010-08-15

    The steam generator management program(SGMP) has recently defined the procedures for the qualification of eddy current hardware and technique. These procedures provide two basic methods for qualification. The first way is to qualify the equipment or the probe by using the flaw mechanism and method of the pulled tubes from the heat exchangers or the artificial flawed tubes. The second way is to verify the equivalency with the characteristics of the qualified equipment or probe. In this case, the qualified equipment or probe may be modified to substitute or replace instruments or probes without re-qualification provided that the range of essential variables defined in the examination technique specification sheet are met. This study is to describe the result of the comparative performance evaluation of bobbin coil eddy current probes manufactured by KEPCO Research Institute and probes manufactured by a foreign manufacturer. As a result of this study, although there were minor differences between the two kinds of probes, it was evaluated that the two kinds of probes were almost identical in the significant performance characteristics described in the KEPCO Research Institute guideline

  19. Some causes of vibrations recorded by in-service diagnostic systems in steam generators of units 1 and 2 of Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Sadilek, J.; Matal, O.

    1989-01-01

    A brief description is presented of the design of the steam generators of the first and second units of the Dukovany nuclear power plant. Attention is also given to the feed water systems and the diagnostic systems. The causes are analyzed of the irregularly occurring vibrations in the steam generators in service. It is demonstrated that the source of the vibrations transmitted to the steam generators are the valves in the feeding tract. The vibrations are induced by dynamic forces from the feed water. Reducing the water pressure at the delivery of the electric feed pumps by reducing the size of the rotor, etc., does not remove all vibrations. It is therefore recommended that valves be ins+alled with better regulating characteristics. (Z.M.). 6 figs., 1 tab., 3 refs

  20. Evaluation of Steam Generator Level behavior for Determination of Turbine Runback rate on COPs trip for Yonggwang 1 and 2 Power Uprating Units

    International Nuclear Information System (INIS)

    Lee, Kyung Jin; Hwang, Su Hyun; Yoo, Tae Geun; Chung, Soon Il; An, Byung Chang; Park, Jung Gu

    2010-01-01

    4.5% power uprate project has been progressing for the first time in Yonggwang 1 and 2(YGN1 and 2). Reviews for design change due to the power uprate were accomplished. Steam generator level behavior was one of the most important parameters because it could be cause of reactor trip or turbine trip. As the results of the reviews, YGN1 and 2 had to reassess it for change of turbine runback rate when turbine runback occurs due to the condensate operating pumps (COP) trip. This study has been carried out for evaluating the steam generator level behavior for determination of turbine runback rate on COPs trip for Yonggwang 1 and 2 Power Uprating Units. The steam generator water level evaluation program for YGN1 and 2 (SLEP-Y1) has been developed for it. The program includes models for the steam generator water level response. SLEP-Y1 is programmed with advanced continuous system simulation language (ACSL). The language has been used to simulate physical systems as a commercial tool used to evaluate system designs

  1. Integrated modelling for improving the design and operation of steam power plants

    NARCIS (Netherlands)

    Van Putten, J.G.

    2008-01-01

    Power producing companies have faced a new situation following the development of unregulated electricity markets. Strong competition forces them to take power production costs into account more carefully in order to maintain or increase profits. Additionally, to promote the efforts to reduce CO2

  2. Calculation of temperature fields formed in induction annealing of closing welded joint of jacket of steam generator for WWER 440 type nuclear power plant using ICL 2960 computer

    International Nuclear Information System (INIS)

    Sajnar, P.; Fiala, J.

    1983-01-01

    The problems are discussed of the mathematical description and simulation of temperature fields in annealing the closing weld of the steam generator jacket of the WWER 440 nuclear power plant. The basic principles are given of induction annealing, the method of calculating temperature fields is indicated and the mathematical description is given of boundary conditions on the outer and inner surfaces of the steam generator jacket for the computation of temperature fields arising during annealing. Also described are the methods of determining the temperature of exposed parts of heat exchange tubes inside the steam generator and the technical possibilities are assessed of the annealing equipment from the point of view of its computer simulation. Five alternatives are given for the computation of temperature fields in the area around the weld for different boundary conditions. The values are given of maximum differences in the temperatures of the metal in the annealed part of the steam generator jacket which allow the assessment of individual computation variants, this mainly from the point of view of observing the course of annealing temperature in the required width of the annealed jacket of the steam generator along both sides of the closing weld. (B.S.)

  3. Consolidated nuclear steam generator

    International Nuclear Information System (INIS)

    Jabsen, F.S.; Schluderberg, D.C.; Paulson, A.E.

    1978-01-01

    An improved system of providing power has a unique generating means for nuclear reactors with a number of steam generators in the form of replaceable modular units of the expendable type to attain the optimum in effective and efficient vaporization of fluid during the generating power. The system is most adaptable to undrground power plants and marine usage

  4. Steam generators and furnaces

    Energy Technology Data Exchange (ETDEWEB)

    Swoboda, E

    1978-04-01

    The documents published in 1977 in the field of steam generators for conventional thermal power plants are classified according to the following subjects: power industry and number of power plants, planning and operation, design and construction, furnaces, environmental effects, dirt accumulation and corrosion, conservation and scouring, control and automation, fundamental research, and materials.

  5. Device for inspection and/or repair of a pipe of a steam raising unit of a nuclear power station

    International Nuclear Information System (INIS)

    Vermaat, H.P.

    1986-01-01

    Eddy current sensors are introduced into the pipe from the steam raising unit chamber. The two-part device on the supporting pillar is used to support the sensors and to position them, and so is an arm connected to it via a clutch. It is accommodated inside the steam raising chamber, but can be operated remotely from outside the steam raising chamber. This reduces the radiation loading of the operating staff. (DG) [de

  6. An homogeneous model of steam generator to simulate operational transiento and accidents in PWR nuclear power plants

    International Nuclear Information System (INIS)

    Souza, A.L. de.

    1981-07-01

    GEVAP - A digital computer code was developed to simulate the thermodynamic transient behaviour of steam generators. The steam generator is divided in heating sections. In each section, the conservation equations of mass and energy are integrated numerically, using a predictor-corrector method. As good reslts where obtained, as compared to transients simulated using more detainled codes, it is concluded that GEVAP can be included as the steam generator module of a more complete systems simulation code for PWR's. (E.G.) [pt

  7. The relationship among CPU utilization, temperature, and thermal power for waste heat utilization

    International Nuclear Information System (INIS)

    Haywood, Anna M.; Sherbeck, Jon; Phelan, Patrick; Varsamopoulos, Georgios; Gupta, Sandeep K.S.

    2015-01-01

    Highlights: • This work graphs a triad relationship among CPU utilization, temperature and power. • Using a custom-built cold plate, we were able capture CPU-generated high quality heat. • The work undertakes a radical approach using mineral oil to directly cool CPUs. • We found that it is possible to use CPU waste energy to power an absorption chiller. - Abstract: This work addresses significant datacenter issues of growth in numbers of computer servers and subsequent electricity expenditure by proposing, analyzing and testing a unique idea of recycling the highest quality waste heat generated by datacenter servers. The aim was to provide a renewable and sustainable energy source for use in cooling the datacenter. The work incorporates novel approaches in waste heat usage, graphing CPU temperature, power and utilization simultaneously, and a mineral oil experimental design and implementation. The work presented investigates and illustrates the quantity and quality of heat that can be captured from a variably tasked liquid-cooled microprocessor on a datacenter server blade. It undertakes a radical approach using mineral oil. The trials examine the feasibility of using the thermal energy from a CPU to drive a cooling process. Results indicate that 123 servers encapsulated in mineral oil can power a 10-ton chiller with a design point of 50.2 kW th . Compared with water-cooling experiments, the mineral oil experiment mitigated the temperature drop between the heat source and discharge line by up to 81%. In addition, due to this reduction in temperature drop, the heat quality in the oil discharge line was up to 12.3 °C higher on average than for water-cooled experiments. Furthermore, mineral oil cooling holds the potential to eliminate the 50% cooling expenditure which initially motivated this project

  8. The Municipal Electrical Utilities' role in buying and selling power

    International Nuclear Information System (INIS)

    Crocker, D.I.

    1999-01-01

    Ontario's Municipal Electrical Utilities (MEUs) are the front-line providers of electricity services for most of the consumers in Ontario. MEUs serve 2.8 million customers (about 70 per cent of all power sold in Ontario). The new regulatory regime resulting from Ontario's Energy Competition Act (1998) will significantly impact MEUs. The changes aim to consolidate and rationalize the point of sale provision of power to Ontario customers and increase the efficiency of the sector. The Energy Competition Act (1998) creates a competitive electricity marketplace and provides mechanisms for its operation, but it is the MEUs which will bear the risk of market failures. Some of the changes which will be most important to MEUs are: (1) incorporation, (2) default supplier, and (3) oversight by the OEB. It is the author's view that the move towards open markets in electricity is unlikely to enlarge the decision making power of MEUs. On the contrary, the legislative scheme creates a complex regulatory environment wherein the distribution corporation must strictly comply with the OEB's requirements and public policy concerns in exercising its functions. As the MEUs essentially serve as a buffer in the newly opened retail markets, they must find ways to minimize their risk of market failures or spread the cost so as to remain viable commercial entities. They must also devise new information systems prior to the opening of the new market to deal with customer and default consumer pricing, billing and transfer of customers to and from retailers. Municipal utilities will also have to consider restructuring of their own operations, including determining which businesses should be pursued through competitive affiliates

  9. ASME power test code ptc 4.1 for steam generators; Codigo de pruebas de potencia ASME ptc 4.1 para generadores de vapor

    Energy Technology Data Exchange (ETDEWEB)

    Plauchu Alcantara, Jorge Alberto [Plauchu Consultores, Morelia, Michoacan (Mexico)

    2001-07-01

    This presentation is oriented towards those who in this subject have experience in the design and equipment specification, plant projects, factory and field testing, operation or result analyses. An important fraction of the national energy supply, approximately 13%, is applied to the steam generation in the different aspects of the industrial activity, in the electrical industry of public service and in the commercial and services sector. The development of the national programs of energy efficiency verifies this when dedicating to this use of the energy important projects, some of them with support of the USAID. The measurement of the energy utilization or the efficiency of steam generators (or boilers) is made applying some procedure agreed by the parts and the one of greater acceptance and best known in Mexico and internationally is the ASME Power Test Code PTC 4.1 for Steam Generators. The purpose and formality in the determination of efficiency and of steam generation capacity behavior, thermal basic regime or fulfillment of guarantees, radically changes the exigencies of strict attachment to the PTC 4.1 This definition will determine the importance of the test method selected, the deviations and convened exceptions, the influence of the precision and the measurement errors, the consideration of auxiliary equipment, etc. An interpretation or incorrect application of the Test Code has lead and will lead to results and nonreliable decisions. [Spanish] Esta exposicion se orienta a quienes en este tema cuenta con experiencia en diseno y especificacion de equipo, proyecto de planta, pruebas en fabrica y campo, operacion o analisis de resultados. Una fraccion importante de la oferta nacional de energia, 13% aproximadamente, se aplica a la generacion de vapor en diferentes giros de actividad industrial, en la industria electrica, de servicio publico y en el sector de servicios y comercial. El desarrollo de los programas nacionales de eficiencia energetica comprueba

  10. Utilization of brown coal in FRG power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kotler, V.R.

    1985-07-01

    FRG methods are studied for utilizing brown coal in view of the development of Kansk-Achinsk brown coal deposits. The use of brown coal in FRG power plants has increased from 15% in 1950- 1960 to 85% (total output) in 1982, providing 79.4 TWh of electrical energy. The remainder was used for briquetting, pulverization and breeze coke. In 1982 nearly 100 million tons of brown coal were burned by six large power stations (rated capacity 11,400 MW) to produce nearly 80 billion kWh of energy. Measures are discussed taken to reduce slagging and to remove excessive moisture content. Problems are analyzed associated with increased contamination of the atmosphere in areas with high population density (412/km/sup 2/) and cost of suppression is reviewed. According to available data, the cost of preventive measures taken by FRG, USA, Japan and the Netherlands is equal to 30% of the total cost of the energy. The most critical problem is suppression of sulfur dioxide, either by dry or wet scrubbers or by the addition of dry dolomite or lime to the furnace (75% of all SO/sub 2/ emissions in FRG comes from power stations). A method is described developed by RWE based on a series of distribution headers in the upper part of combustion chambers. At best, 70-80% reduction can be achieved. 14 references.

  11. The future of utility-scale wind power

    International Nuclear Information System (INIS)

    Hock, S.; Thresher, R.; Williams, T.

    1992-01-01

    The U.S. Department of Energy (DOE) estimates that by 2030, wind power could potentially displace between 3 and 4 quadrillion (10 15 ) Btus (quads) of primary energy, with an installed electrical generation capacity of 120,000 to 160,000 MW. This forecast is based upon economic analyses indicating that the costs of wind-generated electricity could be cost competitive with conventional fossil-fuel-based generation by early next century. The key to realizing this objective is overcoming technical challenges to the development of a next-generation of advanced wind turbines. These challenges include the detailed characterization of wind inflow to turbines at wind-power-plant sites, an understanding of unsteady aerodynamics, the development of sophisticated computer models of all aspects of turbine operation, and the application of a better understanding of component and system fatigue to new designs. Advanced wind systems will include such new technologies as blade designs incorporating advanced airfoils and new materials, variable-speed operation, advanced power electronics, rotor-hub enhancements, tall towers, aerodynamic controls, advanced drive trains, and expert control systems. A larger market share for wind energy will also require the resolution of issues surrounding transmission, storage, and the integration of an intermittent energy source into the utility grid

  12. Effect of mixing on enzymatic hydrolysis of steam-pretreated spruce: a quantitative analysis of conversion and power consumption

    Directory of Open Access Journals (Sweden)

    Wiman Magnus

    2011-05-01

    Full Text Available Abstract Background When scaling up lignocellulose-based ethanol production, the desire to increase the final ethanol titer after fermentation can introduce problems. A high concentration of water-insoluble solids (WIS is needed in the enzymatic hydrolysis step, resulting in increased viscosity, which can cause mass and heat transfer problems because of poor mixing of the material. In the present study, the effects of mixing on the enzymatic hydrolysis of steam-pretreated spruce were investigated using a stirred tank reactor operated with different impeller speeds and enzyme loadings. In addition, the results were related to the power input needed to operate the impeller at different speeds, taking into account the changes in rheology throughout the process. Results A marked difference in hydrolysis rate at different impeller speeds was found. For example, the conversion was twice as high after 48 hours at 500 rpm compared with 25 rpm. This difference remained throughout the 96 hours of hydrolysis. Substantial amounts of energy were required to achieve only minor increases in conversion during the later stages of the process. Conclusions Impeller speed strongly affected both the hydrolysis rate of the pretreated spruce and needed power input. Similar conversions could be obtained at different energy input by altering the mixing (that is, energy input, enzyme load and residence time, an important issue to consider when designing large-scale plants.

  13. Impacts of Western Area Power Administration's power marketing alternatives on electric utility systems

    International Nuclear Information System (INIS)

    Veselka, T.D.; Portante, E.C.; Koritarov, V.

    1995-03-01

    This technical memorandum estimates the effects of alternative contractual commitments that may be initiated by the Western Area Power Administration's Salt Lake City Area Office. It also studies hydropower operational restrictions at the Salt Lake City Area Integrated Projects in combination with these alternatives. Power marketing and hydropower operational effects are estimated in support of Western's Electric Power Marketing Environmental Impact Statement (EIS). Electricity production and capacity expansion for utility systems that will be directly affected by alternatives specified in the EIS are simulated. Cost estimates are presented by utility type and for various activities such as capacity expansion, generation, long-term firm purchases and sales, fixed operation and maintenance expenses, and spot market activities. Operational changes at hydropower facilities are also investigated

  14. Mathematical models of power plant units with once-through steam generators

    International Nuclear Information System (INIS)

    Hofmeister, W.; Kantner, A.

    1977-01-01

    An optimization of effective control functions with the current complex control loop structures and control algorithms is practically not possible. Therefore computer models are required which may be optimized with the process and plant data known before start-up of thermal power plants. The application of process computers allows additional predictions on the control-dynamic behavior of a thermal power plant unit. (TK) [de

  15. Computations of steam flow and heat transfer in nuclear power plant condensers

    International Nuclear Information System (INIS)

    Yuan, A.

    1997-01-01

    To improve performance of its PWR nuclear power plants, Electricite de France has developed a performance monitoring system that checks simultaneously the operation of the components of the secondary system. The performance monitoring system is based on a computational software CITER for steady state runs. A one-dimensional condenser model has been developed. Application of this code to a nuclear power plant condenser shows that predicted values in good agreement with the design values

  16. Studying the effects of combining internal and external heat recovery on techno-economic performances of gas–steam power plants

    International Nuclear Information System (INIS)

    Carapellucci, Roberto; Giordano, Lorena

    2016-01-01

    Highlights: • Effects of gas-cycle regeneration on steam–gas power plants are investigated. • Power plant performances are evaluated varying gas turbine operative parameters. • The power plant operational flexibility is assessed through an off-design analysis. • Gas-cycle regeneration improves energy and economic performance parameters. • Power increase due to regenerator by-pass depends on steam section design. - Abstract: Thermodynamic regeneration is regarded as a conventional technique to enhance the efficiency of gas turbines, by means of an internal recovery of waste heat from exhaust gases. In combined cycle power plants (CCGTs), only external heat recovery is usually applied, in order to achieve the highest steam cycle power. Combining internal and external recovery, while decreasing the power plant rated capacity, has the potential to boost the efficiency of CCGTs. This paper aims to examine the effects of thermodynamic regeneration on steam–gas power plants from the energy and economic point of view. First, a dual pressure combined cycle based on a regenerative gas turbine is designed using GateCycle software and effects on energy and economic performances are evaluated varying gas turbine operating parameters. Then, an off-design simulation of different CCGT configurations is carried out, in order to evaluate the power increase achieved by-passing the regenerator and its effects on efficiency and cost of electricity. The study has shown that the improvement of energy and economic performances of regenerative CCGTs is more and more pronounced with the increase of turbine inlet temperature (TIT). Additionally, regeneration enhances the power plant operational flexibility, allowing to obtain a 30% power increase with respect to the design value, if the regenerator is fully by-passed and the bottoming steam cycle is designed to manage the increased flue gas temperature.

  17. Power quality enhancement at distribution level utilizing the unified power quality conditioner (UPQC)

    Science.gov (United States)

    Khadkikar, Vinod

    The present doctoral work is based on the philosophy of optimal utilization of the available resources in a most effective and efficient way to improve the product efficiency and to reduce the overall cost. This work proposes a novel control philosophy termed as power angle control (PAC), in which both the series and shunt inverters share the load reactive power in co-ordination with each other without affecting the basic UPQC compensation capabilities. This eventually results in a better utilization of the series inverter, reduction in the shunt inverter rating to some extent and ultimately in the reduction of the overall cost of UPQC. Moreover, in this thesis work several other control approaches are also proposed, such as, unit vector template generation, quadrature voltage injection, generalized single-phase p-q theory and novel current unbalance compensation approach. All the developed concepts are successfully validated through digital simulation as well as extensive experimental investigations. Keywords. power quality, active power filter, unified power quality conditioner, reactive power compensation, harmonics compensation.

  18. Wavelets transforms and fuzzy logic in the eddy-current inspection of nuclear power plants steam generator tubes

    International Nuclear Information System (INIS)

    Lopez, Luiz Antonio Negro Martin

    2002-01-01

    Nuclear power plants steam generators around the world have presented early damage history in their tubes, caused either by design errors or by inappropriate operation, which besides reducing the availability and the safety of the nuclear power plants it also generates heavy economical burden. To monitor the steam generators operational condition, the Eddy Current testing of their tubes is the non destructive method used to detect, localize, classify and to size the defects. The inspection is performed by inserting probes with coils in the tubes generating a signal correlated to the defect. These signals produced by the probe electric circuit are composed by the resistance and the inductive components which can be combined to produce a Lissajous figure in the complex plane. However, Eddy-Current signals contain noise which induce subjectivity inducing to errors in the inspector diagnosis. It is not uncommon to have different diagnosis from two inspectors about the same signal. The present work has the objective of supplying a methodology to analyze the signals which could help the inspector in the difficult task of interpreting the Eddy Current signals. It is proposed a method to remove the noise based on Wavelets Transforms. It is also proposed a normalization in the signal phase angle measurements. Furthermore, two additional characteristics are also studied, namely: the signal amplitudes and the widths of the Lissajous petals. The use of a Fuzzy Logic based inference engine is also developed and its use is demonstrated to be viable. The defects studied in this work are those which produces volumetric changes in the material. In order to test the proposed methodology, several artificial defects were produced in tubes using different types of materials like: brass, 316L stainless steel and Inconel 600 to produce a experimental data base. An Eddy-Current inspection equipment, the MIZ-17ET was used. Around 1000 time series signals of defects were acquired through

  19. Global freshwater thermal emissions from steam-electric power plants with once-through cooling systems

    International Nuclear Information System (INIS)

    Raptis, Catherine E.; Pfister, Stephan

    2016-01-01

    Large quantities of heat are rejected into freshwater bodies from power plants employing once-through cooling systems, often leading to temperature increases that disturb aquatic ecosystems. The objective of this work was to produce a high resolution global picture of power-related freshwater thermal emissions and to analyse the technological, geographical and chronological patterns behind them. The Rankine cycle was systematically solved for ∼2400 generating units with once-through cooling systems, distinguishing between simple and cogenerative cycles, giving the rejected heat as a direct output. With large unit sizes, low efficiencies, and high capacity factors, nuclear power plants reject 3.7 GW heat into freshwater on average, contrasting with 480 MW rejected from coal and gas power plants. Together, nuclear and coal-fuelled power plants from the 1970s and 1980s account for almost 50% of the rejected heat worldwide, offering motivation for their phasing out in the future. Globally, 56% of the emissions are rejected into rivers, pointing to potential areas of high thermal pollution, with the rest entering lakes and reservoirs. The outcome of this work can be used to further investigate the identified thermal emission hotspots, and to calculate regionalized water temperature increase and related impacts in environmental, energy-water nexus studies and beyond. - Highlights: • The thermodynamic cycles of ∼2400 power units with once-through cooling were solved. • Global freshwater heat emissions depend on technology, geography & chronology. • Half the global emissions come from nuclear and coal plants from the 70s & 80s. • Hotspots of freshwater thermal emissions were identified globally. • Global georeferenced emissions are available for use in water temperature models.

  20. Steam explosions-induced containment failure studies for Swiss nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Zuchuat, O.; Schmocker, U. [Swiss Federal Nuclear Safety Inspectorate, Villigen (Switzerland); Esmaili, H.; Khatib-Rahbar, M.

    1998-01-01

    The assessment of the consequences of both in-vessel and ex-vessel energetic fuel-coolant interaction for Beznau (a Westinghouse pressurized water reactor with a large, dry containment), Goesgen (a Siemens/KWU pressurized water reactor with a large, dry containment) and Leibstadt (a General Electric boiling water reactor-6 with a free standing steel, MARK-III containment) nuclear power plants is presented in this paper. The Conditional Containment Failure Probability of the steel containment of these Swiss nuclear power plants is determined based on different probabilistic approaches. (author)