    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans. ((orig.))

  2. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans

  3. SRS control system upgrade requirements

    International Nuclear Information System (INIS)

    Hill, L.F.

    1998-01-01

    This document defines requirements for an upgrade of the Sodium Removal System (SRS) control system. The upgrade is being performed to solve a number of maintainability and operability issues. The upgraded system will provide the same functions, controls and interlocks as the present system, and in addition provide enhanced functionality in areas discussed in this document

  4. ISTTOK control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Ivo S., E-mail: ivoc@ipfn.ist.utl.pt; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-10-15

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel{sup ®} Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators.

  5. ISTTOK control system upgrade

    International Nuclear Information System (INIS)

    Carvalho, Ivo S.; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-01-01

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel ® Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators

  6. Upgrading the ATLAS control system

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.

    1993-01-01

    Heavy-ion accelerators are tools used in the research of nuclear and atomic physics. The ATLAS facility at the Argonne National Laboratory is one such tool. The ATLAS control system serves as the primary operator interface to the accelerator. A project to upgrade the control system is presently in progress. Since this is an upgrade project and not a new installation, it was imperative that the development work proceed without interference to normal operations. An additional criteria for the development work was that the writing of additional ''in-house'' software should be kept to a minimum. This paper briefly describes the control system being upgraded, and explains some of the reasons for the decision to upgrade the control system. Design considerations and goals for the new system are described, and the present status of the upgrade is discussed

  7. Upgrading the BEPC control system

    International Nuclear Information System (INIS)

    Yang Liping; Wang Lizheng; Liu Shiyao

    1992-01-01

    The BEPC control system has been put into operation and operated normally since the end of 1987. Three years's experience shows this system can satisfy basically the operation requirements, also exhibits some disadvantages araised from the original centralized system architecture based on the VAX-VCC-CAMAC, such as slow response, bottle neck of VCC, less CPU power for control etc.. This paper describes the method and procedure for upgrading the BEPC control system which will be based on DEC net and DEC-WS, and thus intend to upgrade the control system architecture from the centralized to the distributed and improve the integral system performance. (author)

  8. Argonne's atlas control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.; Quock, D.; Chapin, B.; Figueroa, J.

    1999-01-01

    The ATLAS facility (Argonne Tandem-Linac Accelerator System) is located at the Argonne National Laboratory. The facility is a tool used in nuclear and atomic physics research, which focuses primarily on heavy-ion physics. The accelerator as well as its control system are evolutionary in nature, and consequently, continue to advance. In 1998 the most recent project to upgrade the ATLAS control system was completed. This paper briefly reviews the upgrade, and summarizes the configuration and features of the resulting control system

  9. Completion of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F. H.

    1998-01-01

    In the fall of 1992 at the SNEAP(Symposium of North Eastern Accelerator Personnel) a project to up grade the ATLAS (Argonne Tandem Linear Accelerator System) control system was first reported. Not unlike the accelerator it services the control system will continue to evolve. However, the first of this year has marked the completion of this most recent upgrade project. Since the control system upgrade took place during a period when ATLAS was operating at a record number of hours, special techniques were necessary to enable the development of the new control system ''on line'' while still saving the needs of normal operations. This paper reviews the techniques used for upgrading the ATLAS control system while the system was in use. In addition a summary of the upgrade project and final configuration, as well as some of the features of the new control system is provided

  10. Status of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.; Rutherford, B.

    1992-01-01

    Certain components of the ATLAS control system are two generations behind today's technology. It has been decided to upgrade the control system. in part, by replacing Digital Equipment Corporation (DEC) PDP-11 computers with present-day VAX technology. Two primary goals have been defined for the upgraded control system. The first of these goals is to keep additional ''in-house'' written software to a minimum, while providing the portability necessary to ensure the continued use of existing software. In an attempt to achieve this goal, commercially-available software has been utilized to provide a foundation for the final control-system configuration. The second goal is to develop the new control system, while not interfering with accelerator operations. This paper describes some of the motivation for upgrading the ATLAS control system, the basic features of the new control system, and the present status of the system's development

  11. The LANSCE RICE control system upgrade.

    Energy Technology Data Exchange (ETDEWEB)

    Oothoudt, Michael; Schaller, S. (Stuart); Bjorklund, E. A. (Eric A.); Burns, M. J. (Mary J.); Carr, G. (Gary); Carr, G. (Gary); Faucett, John Allen,; Hayden, D. J. (David J.); Lusk, M. D. (Matthew D.); Merl, R. B. (Robert B.); Potter, J. M. (Jerry M.); Reynolds, J. A. (Jerome A.); Romero, D. B. (Dolores B.); Shelley, F. E. (Fred E.)

    2003-01-01

    The LANSCE (Los Alamos Neutron Science Center) control system upgrade program continues with the impending replacement of the RICE (Remote Instrumentation and Control Equipment) subsystem. The RICE subsystem upgrade is a challenge because of its technology (late 1960s), number of channels (>10,000), and unique characteristics (all-modules data takes, timed/flavored data takes). The plan is to replace at least the non-timed data and the command portions of the subsystem with Programmable Logic Controllers (PLCs). We discuss motivations, technological challenges, proof-of-principle, and planning. The boundary condition, as usual, is that we must implement these major changes on a running accelerator.

  12. The LANSCE RICE control system upgrade

    International Nuclear Information System (INIS)

    Oothoudt, Michael; Schaller, S.; Bjorklund, E.A.; Burns, M.J.; Carr, G.; Faucett, John Allen; Hayden, D.J.; Lusk, M.D.; Merl, R.B.; Potter, J.M.; Reynolds, J.A.; Romero, D.B.; Shelley, F.E.

    2003-01-01

    The LANSCE (Los Alamos Neutron Science Center) control system upgrade program continues with the impending replacement of the RICE (Remote Instrumentation and Control Equipment) subsystem. The RICE subsystem upgrade is a challenge because of its technology (late 1960s), number of channels (>10,000), and unique characteristics (all-modules data takes, timed/flavored data takes). The plan is to replace at least the non-timed data and the command portions of the subsystem with Programmable Logic Controllers (PLCs). We discuss motivations, technological challenges, proof-of-principle, and planning. The boundary condition, as usual, is that we must implement these major changes on a running accelerator.

  13. NSTX-U Control System Upgrades

    International Nuclear Information System (INIS)

    Erickson, K.G.; Gates, D.A.; Gerhardt, S.P.; Lawson, J.E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G.J.

    2014-01-01

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control

  14. NSTX-U Control System Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Erickson, K.G., E-mail: kerickso@pppl.gov; Gates, D.A.; Gerhardt, S.P.; Lawson, J.E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G.J.

    2014-06-15

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.

  15. Control system for Fermilab's low temperature upgrade

    International Nuclear Information System (INIS)

    Norris, B.L.

    1996-09-01

    Fermilab recently upgraded the Tevatron Cryogenic Systems to allow for lower temperature operation. This Lower Temperature Upgrade grew out of a desire to increase the Colliding Beam Physics energy from 900 GeV to 1000 GeV. A key element in achieving this goal is the new cryogenic control system designed at Fermilab and installed in 24 satellite refrigerators and 8 compressor buildings. The cryogenic improvements and addition hardware like cold compressors exceeded the capability of the original distributed controls package. The new distributed controls package uses a Multibus II platform and Intel's 80386 microprocessor. Token Ring is used as the link to the systems 6 primary crate locations with Arcnet used as the connection to the systems numerous I/O crates. I/0 capabilities are double the capabilities of the original system. Software has also been upgraded with the introduction of more flexible control loop strategies and Finite State Machines used for automatic sequential control, like quench recovery or cold compressor pump down

  16. The APS control system network upgrade

    International Nuclear Information System (INIS)

    Sidorowicz, K. v.; Leibfritz, D.; McDowell, W. P.

    1999-01-01

    When it was installed,the Advanced Photon Source (APS) control system network was at the state-of-the-art. Different aspects of the system have been reported at previous meetings [1,2]. As loads on the controls network have increased due to newer and faster workstations and front-end computers, we have found performance of the system declining and have implemented an upgraded network. There have been dramatic advances in networking hardware in the last several years. The upgraded APS controls network replaces the original FDDI backbone and shared Ethernet hubs with redundant gigabit uplinks and fully switched 10/100 Ethernet switches with backplane fabrics in excess of 20 Gbits/s (Gbps). The central collapsed backbone FDDI concentrator has been replaced with a Gigabit Ethernet switch with greater than 30 Gbps backplane fabric. Full redundancy of the system has been maintained. This paper will discuss this upgrade and include performance data and performance comparisons with the original network

  17. Control system upgrades support better plant economics

    International Nuclear Information System (INIS)

    De Grosbois, J.; Hepburn, A.; Storey, H.; Basso, R.; Kumar, V.

    2002-01-01

    This paper (second in the series, see [1]) provides insight on how nuclear plants can achieve better efficiencies and reduced operations and maintenance (O and M) costs through focused control system upgrades. An understanding of this relationship is necessary to properly assess the economics of plant refurbishment decisions. Traditional economic feasibility assessment methods such as benefit cost analysis (BCA), internal rate of return (IRR), benefit cost ratios (B/C), or payback analysis are often performed without full consideration of project alternatives, quantified benefits, and life cycle costing. Consideration must be given to not only capital cost and project risk, but also to the potential economic benefits of new technology and added functionality offered by plant upgrades. Recent experience shows that if upgrades are focused on priority objectives, and are effectively implemented, they can deliver significant payback over the life of the plant, sometimes orders of magnitude higher than their initial capital cost. The following discussion explores some of the key issues and rationale behind upgrade decisions and their impact on improved plant efficiency and reduced O and M costs. A subsequent paper will explain how the justification for these improvements can be captured in an economic analysis and feasibility study to support strategic decision-making in a plant refurbishment context. (author)

  18. LHCb: A new Readout Control system for the LHCb Upgrade

    CERN Multimedia

    Alessio, F

    2012-01-01

    The LHCb experiment has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity. The entire readout architecture will be upgraded in order to cope with higher sub-detector occupancies, higher rate and higher network load. In this paper, we describe the architecture, functionalities and the first hardware implementation of a new Readout Control system for the LHCb upgrade. The system is based on FPGAs and bi-directional links for the control of the entire readout architecture. First results on the validation of the system are also given.

  19. NPP Temelin instrumentation and control system upgrade and verification

    International Nuclear Information System (INIS)

    Ubra, O.; Petrlik, J.

    1998-01-01

    Two units of Ver 1000 type of the Czech nuclear power plant Temelin, which are under construction are being upgraded with the latest instrumentation and control system delivered by WEC. To confirm that the functional design of the new Reactor Control and Limitation System, Turbine Control System and Plant Control System are in compliance with the Czech customer requirements and that these requirements are compatible with NPP Temelin upgraded technology, the verification of the control systems has been performed. The method of transient analysis has been applied. Some details of the NPP Temelin Reactor Control and Limitation System verification are presented.(author)

  20. Progress and plan of KSTAR plasma control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, Sang-hee, E-mail: hahn76@nfri.re.kr [National Fusion Research Institute, Daejeon (Korea, Republic of); Kim, Y.J. [National Fusion Research Institute, Daejeon (Korea, Republic of); Penaflor, B.G. [General Atomics, San Diego, CA (United States); Bak, J.G.; Han, H.; Hong, J.S.; Jeon, Y.M.; Jeong, J.H.; Joung, M.; Juhn, J.W.; Kim, J.S.; Kim, H.S.; Lee, W.R.; Woo, M.H. [National Fusion Research Institute, Daejeon (Korea, Republic of); Eidietis, N.W.; Ferron, J.R.; Humphreys, D.A.; Hyatt, A.; Johnson, R.D.; Piglowski, D.A. [General Atomics, San Diego, CA (United States); and others

    2016-11-15

    Highlights: • Recent achievements of the KSTAR plasma control system are described. • Requirements and results of the testbed system for the future upgrade of the KSTAR plasma control system are presented. • An overview of the upgrade layout based is given. - Abstract: The plasma control system (PCS) has been one of essential systems in annual KSTAR plasma campaigns: starting from a single-process version in 2008, extensive upgrades are done through the previous 7 years in order to achieve major goals of KSTAR performance enhancement. Major implementations are explained in this paper. In consequences of successive upgrades, the present KSTAR PCS is able to achieve ∼48 s of 500 kA plasma pulses with full real-time shaping controls and real-time NB power controls. It has become a huge system capable of dealing with 8 separate categories of algorithms, 26 actuators directly controllable during the shot, and real-time data communication units consisting of +180 analog channels and +600 digital input/outputs through the reflective memory (RFM) network. The next upgrade of the KSTAR PCS is planned in 2015 before the campaign. An overview of the upgrade layout will be given for this paper. The real-time system box is planned to use the CERN MRG-Realtime OS, an ITER-compatible standard operating system. New hardware is developed for faster real-time streaming system for future installations of actuators/diagnostics.

  1. The status of the LAMPF control system upgrade

    International Nuclear Information System (INIS)

    Carr, G.P.; Schaller, S.C.; Bjorklund, E.A.; Burns, M.J.; Harrison, J.F.; Rose, P.A.; Schultz, D.E.

    1987-01-01

    The upgraded Los Alamos Meson Physics Facility (LAMPF) control system is now operational. The SEL-840 computer has been removed, and all application programs are now running on VAXes. We are continuing to upgrade the control system network. We are using MicroVMS systems for distributed local control and have introduced VAXELN systems for dedicated real-time situations. Communications with both systems is based on a standardized remote procedure call interface. We have also begun to integrate the Proton Storage Ring controls with the LAMPF control system, to experiment with VAX/GPX-based workstation operator interfaces, and to investigate possible applications of artificial intelligence technology. 13 refs

  2. Upgrading the Fermilab Linac local control system

    International Nuclear Information System (INIS)

    McCrory, E.S.; Goodwin, R.W.; Shea, M.F.

    1991-02-01

    A new control system for the Fermilab Linac is being designed, built and implemented. First, the nine-year-old linac control system is being replaced. Second, a control system for the new 805 MHz part of the linac is being built. The two systems are essentially identical, so that when the installations are complete, we will still have a single Linac Control System. 8 refs., 5 figs

  3. RF Control System Upgrade at CAMD

    CERN Document Server

    Suller, Victor P; Jines, Paul; Launey, Daren

    2005-01-01

    A description is given of the new control system for the RF system of the CAMD light source. The new design being implemented brings all RF signals into the data acquisition system via a modular, custom made, RF detector and renders the amplitude and tune control loops in the VME computer. On line calculations ensure monitoring of proper operation and display the information to the user in an efficient way. In addition, an advanced load impedance monitoring diagnostic has been implemented, being displayed as a Smith Chart, which is based on the system used at the SRS in Daresbury, England.

  4. Upgrade plan for HANARO control computer system

    International Nuclear Information System (INIS)

    Kim, Min Jin; Kim, Young Ki; Jung, Hwan Sung; Choi, Young San; Woo, Jong Sub; Jun, Byung Jin

    2001-01-01

    A microprocessor based digital control system, the Multi-Loop Controller (MLC), which was chosen to control HANARO, was introduced to the market in early '80s and it had been used to control petrochemical plant, paper mill and Slowpoke reactor in Canada. Due to the development in computer technology, it has become so outdated model and the production of this model was discontinued a few years ago. Hence difficulty in acquiring the spare parts is expected. To achieve stable reactor control during its lifetime and to avoid possible technical dependency to the manufacturer, a long-term replacement plan for HANARO control computer system is on its way. The plan will include a few steps in its process. This paper briefly introduces the methods of implementation of the process and discusses the engineering activities of the plan

  5. Upgrade of GANIL control system cluster

    International Nuclear Information System (INIS)

    David, L.

    1998-01-01

    The GANIL control system was based on VAX 32 bit computers connected on a coaxial ethernet network. Since last year we are using an Alpha server with 64 bit Alpha workstations. At the same time the network is moving to twisted pair linked to a HUB concentrator, which is itself connected to the main FDDI ring. Solutions to solve the following problems are presented: the generalization of control graphical interfaces; extensive usage of the data base; the compilation of the more complex units; object programming; adaption to the new materials technologies; migration towards another operating system. Also described is the modification in the network imposed by the supplementary control of SPIRAL

  6. D0 HVAC System Controls Evaluation of Upgrade Options

    International Nuclear Information System (INIS)

    Markley, D.; Simon, P.

    1998-01-01

    This engineering note documents three different options for upgrading the Dzero HVAC control system. All three options leave the current field hardware and field devices intact and upgrade the computer control hardware and software. Dzero will be heading into a physics run starting in 2000. This physics run could last several years. The Dzero HVAC system is an integral part of climate control and electronics cooling. The current HVAC control system is based upon a 1985 Johnson Controls System. In order to enter the next long-term physics run with a solid HVAC control system, the current control system needs to be upgraded. This proposal investigates three options: (1) Replacement to the next generation of Johnson Controls Hardware and Software with the Johnson Controls operator interface - FESS; (2) Replacement to the next generation of Johnson Controls Hardware and Software with the FIX32 Operator Interface - FESS/Dzero; and (3) Replacement with a commercially available Programmable Logic Controller (PLC) WITH THE FIX 32 Operator Interface - Dzero.

  7. Upgrade of the Control System of the IFUNAM's Pelletron Accelerator

    OpenAIRE

    Macias, R.; Chavez, E.; Ortiz, M. E.; Lopez, K.; Huerta, A.; Verde, M. C.

    2001-01-01

    In 1995 a 9SDH-2 Pelletron from NEC was installed at IFUNAM (Instituto de Fisica, Universidad Nacional Autonoma de Mexico). Two beam lines have been operational since then and two new lines have been built. In order to perform the planned projects in this grown facility, an upgrading of the original manual control system is required. The proposed new control system takes advantage of the existing devices and incorporates the electronics needed for the newer beam lines. The control software fr...

  8. Simulation of the TREAT-Upgrade Automatic Reactor Control System

    International Nuclear Information System (INIS)

    Lipinski, W.C.; Kirsch, L.W.; Valente, A.D.

    1984-01-01

    This paper describes the design of the Automatic Reactor Control System (ARCS) for the Transient Reactor Test Facility (TREAT) Upgrade. A simulation was used to facilitate the ARCS design and to completely test and verify its operation before installation at the TREAT facility

  9. Upgrading instrumentation and control systems for plant safety and operation

    International Nuclear Information System (INIS)

    Martin, M.; Prehler, H.J.; Schramm, W.

    1997-01-01

    Upgrading the electrical systems and instrumentation and control systems has become increasingly more important in the past few years for nuclear power plants currently in operation. As the requirements to be met in terms of plant safety and availability have become more stringent in the past few years, Western plants built in the sixties and seventies have been the subject of manifold backfitting and upgrading measures in the past. In the meantime, however, various nuclear power plants are facing much more thorough upgrading phases because of the difficulties in obtaining spare parts for older equipment systems. As digital technology has become widespread in many areas because of its advantages, and as applications are continuously expanding, conventional equipment and systems are losing more and more ground as a consequence of decreasing demand. Merely because of the pronounced decline in demand for conventional electronic components it is possible for equipment manufacturers to guarantee spare parts deliveries for older systems only for specific future periods of time. In addition, one-off manufacture entails high costs in purchases of spare parts. As a consequence of current thinking more and more focusing on availability and economy, upgrading of electrical systems and instrumentation and control systems is becoming a more and more topical question, for older plants even to ensure completion of full service life. (orig.) [de

  10. Control system for Fermilab`s low temperature upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Norris, B.L.

    1996-09-01

    Fermilab recently upgraded the Tevatron Cryogenic Systems to allow for lower temperature operation. This Lower Temperature Upgrade grew out of a desire to increase the Colliding Beam Physics energy from 900 GeV to 1000 GeV. A key element in achieving this goal is the new cryogenic control system designed at Fermilab and installed in 24 satellite refrigerators and 8 compressor buildings. The cryogenic improvements and addition hardware like cold compressors exceeded the capability of the original distributed controls package. The new distributed controls package uses a Multibus II platform and Intel`s 80386 microprocessor. Token Ring is used as the link to the systems 6 primary crate locations with Arcnet used as the connection to the systems numerous I/O crates. I/0 capabilities are double the capabilities of the original system. Software has also been upgraded with the introduction of more flexible control loop strategies and Finite State Machines used for automatic sequential control, like quench recovery or cold compressor pump down.

  11. Timing and control monitor system upgrade design document. Version 4

    International Nuclear Information System (INIS)

    Brandt, J.J.

    1984-01-01

    This is a design document for the Timing and Control Monitor System Upgrade Project. This project is intended to provide a replacement system for the existing user Encoder Monitor Systems and Varian 72 Control Room computer systems. All of these systems reside at the Nevada Test Site. The function of the T and C Monitor System is to gather real-time statistics and data on user defined key variables from control, communication, data acquistion systems, and from the monitoring system itself. The control, communication, and data acquisition systems each operate separately from the monitor system. The T and C Monitor System gathers this data in order to verify the readiness of an event to begin countdown. This includes setup, verification, calibration, and peripheral services, report any failures that may occur during the countdown, verify detonation and containment, and assist reentry activities after the event

  12. Upgrade to the control system of the reflectometry diagnostic of ASDEX upgrade

    International Nuclear Information System (INIS)

    Graca, S.; Santos, J.; Manso, M.E.

    2004-01-01

    The broadband frequency modulation-continuous wave microwave/millimeter wave reflectometer of ASDEX upgrade tokamak (Institut fuer Plasma Physik (IPP), Garching, Germany) developed by Centro de Fusao Nuclear (Lisboa, Portugal) with the collaboration of IPP, is a complex system with 13 channels (O and X modes) and two types of operation modes (swept and fixed frequency). The control system that ensures remote operation of the diagnostic incorporates VME and CAMAC bus based acquisition/timing systems. Microprocessor input/output boards are used to control and monitor the microwave circuitry and associated electronic devices. The implementation of the control system is based on an object-oriented client/server model: a centralized server manages the hardware and receives input from remote clients. Communication is handled through transmission control protocol/internet protocol sockets. Here we describe recent upgrades of the control system aiming to: (i) accommodate new channels; (ii) adapt to the heterogeneity of computing platforms and operating systems; and (iii) overcome remote access restrictions. Platform and operating system independence was achieved by redesigning the graphical user interface in JAVA. As secure shell is the standard remote access protocol adopted in major fusion laboratories, secure shell tunneling was implemented to allow remote operation of the diagnostic through the existing firewalls

  13. Upgrade to the control system of the reflectometry diagnostic of ASDEX upgrade

    Science.gov (United States)

    Graça, S.; Santos, J.; Manso, M. E.

    2004-10-01

    The broadband frequency modulation-continuous wave microwave/millimeter wave reflectometer of ASDEX upgrade tokamak (Institut für Plasma Physik (IPP), Garching, Germany) developed by Centro de Fusão Nuclear (Lisboa, Portugal) with the collaboration of IPP, is a complex system with 13 channels (O and X modes) and two types of operation modes (swept and fixed frequency). The control system that ensures remote operation of the diagnostic incorporates VME and CAMAC bus based acquisition/timing systems. Microprocessor input/output boards are used to control and monitor the microwave circuitry and associated electronic devices. The implementation of the control system is based on an object-oriented client/server model: a centralized server manages the hardware and receives input from remote clients. Communication is handled through transmission control protocol/internet protocol sockets. Here we describe recent upgrades of the control system aiming to: (i) accommodate new channels; (ii) adapt to the heterogeneity of computing platforms and operating systems; and (iii) overcome remote access restrictions. Platform and operating system independence was achieved by redesigning the graphical user interface in JAVA. As secure shell is the standard remote access protocol adopted in major fusion laboratories, secure shell tunneling was implemented to allow remote operation of the diagnostic through the existing firewalls.

  14. Using EPICS enabled industrial hardware for upgrading control systems

    International Nuclear Information System (INIS)

    Bjorkland, Eric A.; Veeramani, Arun; Debelle, Thierry

    2009-01-01

    Los Alamos National Laboratory has been working with National Instruments (NI) and Cosy lab to implement EPICS Input Output Controller (IOC) software that runs directly on NI CompactRIO Real Time Controller (RTC) and communicates with NI LabVIEW through a shared memory interface. In this presentation, we will discuss our current progress in upgrading the control system at the Los Alamos Neutron Science Centre (LANSCE) and what we have learned about integrating CompactRIO into large experimental physics facilities. We will also discuss the implications of using Channel Access Server for LabVIEW which will enable more commercial hardware platforms to be used in upgrading existing facilities or in commissioning new ones.

  15. Upgrade of the Los Alamos Plutonium Facility control system

    International Nuclear Information System (INIS)

    Pope, N.G.; Turner, W.J.; Brown, R.E.; Bibeau, R.A.; Davis, R.R.; Hogan, K.

    1996-01-01

    After 20 yrs service, the Los Alamos Plutonium Facility is undergoing an upgrade to its aging Facility Control System. The new system design includes a network of redundantly-paired programmable logic controllers that will interface with about 2200 field data points. The data communications network that has been designed includes a redundant, self-healing fiber optic data highway as well as a fiber optic ethernet. Commercially available human-machine interface software running on a UNIX-based system displays facility subsystem status operator X-terminals. Project design features, methods, costs, and schedule are discussed

  16. A control system upgrade of the spear synchrotron and injector

    International Nuclear Information System (INIS)

    Garrett, R.; Howry, S.; Wermelskirchen, C.; Yang, J.

    1995-11-01

    The SPEAR electron synchrotron is an old and venerable facility with a history of great physics. When this storage ring was converted to serve as a full-time synchrotron light source, it was evident that the facility was due for an overhaul of its control system. Outdated hardware interfaces, custom operator interfaces, and the control computer itself were replaced with off-the-shelf distributed intelligent controllers and networked X-workstations. However, almost all applications and control functions were retained by simply rewriting the layer of software closest to each new device. The success of this upgrade prompted us to do a similar upgrade of our Injector system. Although the Injector was already running an X-windows based control system, it was non-networked and Q-bus based. By using the same Ethernet based controllers that were used at SPEAR, we were able to integrate the two systems into one that resembles the ''standard model'' for control systems, and at the same time preserve the applications software that has been developed over the years on both systems

  17. Upgrade of the COMPASS tokamak real-time control system

    Energy Technology Data Exchange (ETDEWEB)

    Janky, F., E-mail: filip.janky.work@gmail.com [Institute of Plasma Physics, AS CR, v.v.i., Association EURATOM/IPP.CR, Za Slovankou 3, 18200 Prague (Czech Republic); Charles University in Prague, Faculty of Mathematics and Physics, V Holesovickach 2, 18000 Prague (Czech Republic); Havlicek, J. [Institute of Plasma Physics, AS CR, v.v.i., Association EURATOM/IPP.CR, Za Slovankou 3, 18200 Prague (Czech Republic); Charles University in Prague, Faculty of Mathematics and Physics, V Holesovickach 2, 18000 Prague (Czech Republic); Batista, A.J.N. [Associação EURATOM/IST, Instituto de Plasmas e Fusão Nuclear, Instituto Superior Técnico, Universidade Técnica de Lisboa, 1049-001 Lisboa (Portugal); Kudlacek, O.; Seidl, J. [Institute of Plasma Physics, AS CR, v.v.i., Association EURATOM/IPP.CR, Za Slovankou 3, 18200 Prague (Czech Republic); Neto, A.C. [Associação EURATOM/IST, Instituto de Plasmas e Fusão Nuclear, Instituto Superior Técnico, Universidade Técnica de Lisboa, 1049-001 Lisboa (Portugal); Pipek, J.; Hron, M. [Institute of Plasma Physics, AS CR, v.v.i., Association EURATOM/IPP.CR, Za Slovankou 3, 18200 Prague (Czech Republic); Mikulin, O. [Institute of Plasma Physics, AS CR, v.v.i., Association EURATOM/IPP.CR, Za Slovankou 3, 18200 Prague (Czech Republic); Czech Technical University, Faculty of Nuclear Sciences and Physical Engineering, V Holesovickach 2, 18000 Prague (Czech Republic); and others

    2014-03-15

    Highlights: • An upgrade of the COMPASS real-time system has been made to generally improve the plasma performance. • Stability of discharges in SNT configuration has been increased. • Plasma flat-top phase length has been extended. • Central solenoid protection has been developed. • Plasma position estimation has been improved. - Abstract: The COMPASS plasma control system is based on the MARTe real-time framework. Thanks to MARTe modularity and flexibility new algorithms have been developed for plasma diagnostic (plasma position calculation), control (shaping field control), and protection systems (central solenoid protection). Moreover, the MARTe framework itself was modified to broaden the communication capabilities via Aurora. This paper presents the recent upgrades and improvements made to the COMPASS real-time plasma control system, focusing on the issues related to precision of the real-time calculations, and discussing the improvements in terms of discharge parameters and stability. In particular, the new real-time system has given the possibility to analyze and to minimize the transport delays of each control loop.

  18. Gas box control system for Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Bell, H.H. Jr.; Hunt, A.L.; Clower, C.A. Jr.

    1983-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-U) uses several methods to feed gas (usually deuterium) at different energies into the plasma region of the machine. One is an arrangement of eight high-speed piezo-electric valves mounted on special manifolds (gas box) that feed cold gas directly to the plasma. This paper describes the electronic valve control and data acquisition portions of the gas box, which are controlled by a desk-top computer. Various flow profiles have been developed and stored in the control computer for ready access by the operator. The system uses two modes of operation, one that exercises and characterizes the valves and one that operates the valves with the rest of the experiment. Both the valve control signals and the pressure transducers data are recorded on the diagnostics computer so that they are available for experiment analysis

  19. Plasma control system upgrade and increased plasma stability in NSTX

    Energy Technology Data Exchange (ETDEWEB)

    Mastrovito, D., E-mail: dmastrovito@pppl.go [Princeton Plasma Physics Laboratory, P.O. Box 451 Princeton, NJ 08543 (United States); Gates, D.; Gerhard, S.; Lawson, J.; Ludescher-Furth, C.; Marsala, R. [Princeton Plasma Physics Laboratory, P.O. Box 451 Princeton, NJ 08543 (United States)

    2010-07-15

    Plasma control on the National Spherical Torus Experiment (NSTX) was previously accomplished using eight 333 MHz G4 processors built by Sky computers. Several planned improvements and additional control algorithms required significant upgrades to our real-time control computers and real-time data acquisition infrastructure. Several in-house modules have been designed and implemented including: the digital time stamp module (DITS) and for digital/analog front panel data port (FPDP) output, the FPDP output module digital/analog (FOMD/A). Standard Linux based Intel computers perform the real-time control tasks and InfiniBand as been employed for communication between a user-accessible 'host' server and the real-time computer. In addition to several independent real-time processes the General Atomics developed PCS (Bell (2006) ) system infrastructure continues to be used on NSTX. While maintaining previous functionality, improvements in the control system software include: an RWM feedback algorithm, beta feedback NBI control, more comprehensive error logging and trapping, more user-friendly interface, more complete archiving and restoring functionality, and better status reporting and diagnostic tools. Once completed, we succeeded in increasing overall plasma stability and decreasing control system latency by several times.

  20. Upgrading NASA/DOSE laser ranging system control computers

    Science.gov (United States)

    Ricklefs, Randall L.; Cheek, Jack; Seery, Paul J.; Emenheiser, Kenneth S.; Hanrahan, William P., III; Mcgarry, Jan F.

    1993-01-01

    Laser ranging systems now managed by the NASA Dynamics of the Solid Earth (DOSE) and operated by the Bendix Field Engineering Corporation, the University of Hawaii, and the University of Texas have produced a wealth on interdisciplinary scientific data over the last three decades. Despite upgrades to the most of the ranging station subsystems, the control computers remain a mix of 1970's vintage minicomputers. These encompass a wide range of vendors, operating systems, and languages, making hardware and software support increasingly difficult. Current technology allows replacement of controller computers at a relatively low cost while maintaining excellent processing power and a friendly operating environment. The new controller systems are now being designed using IBM-PC-compatible 80486-based microcomputers, a real-time Unix operating system (LynxOS), and X-windows/Motif IB, and serial interfaces have been chosen. This design supports minimizing short and long term costs by relying on proven standards for both hardware and software components. Currently, the project is in the design and prototyping stage with the first systems targeted for production in mid-1993.

  1. Upgrade of the RFX-mod real time control system

    Energy Technology Data Exchange (ETDEWEB)

    Manduchi, G., E-mail: gabriele.manduchi@igi.cnr.it [Consorzio RFX, Euratom-ENEA Association, Corso Stati Uniti 4, Padova 35127 (Italy); Barbalace, A.; Luchetta, A.; Soppelsa, A.; Taliercio, C.; Zampiva, E. [Consorzio RFX, Euratom-ENEA Association, Corso Stati Uniti 4, Padova 35127 (Italy)

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer The paper describes the experience in running the real-time control system of RFX-mod. Black-Right-Pointing-Pointer It proposes a new architecture based multicore technology. Black-Right-Pointing-Pointer It analyzes two different solutions for data acquisition. Black-Right-Pointing-Pointer It discusses the effect of non simultaneous sampling in acquisition. Black-Right-Pointing-Pointer It provides some preliminary performance measurements. - Abstract: The real-time control system of RFX-mod, in operation since 2005, has been successful and has allowed several important achievements in the RFX physics research program. As a consequence of this fact, new control algorithms are under investigation, which are more demanding in terms of both enhanced computing power and reduced system latency, currently around 1.5 ms. For this reason, a major upgrade of the system is being considered, and a new architecture has been proposed, taking advantage of the rapid evolution of computer technology in the last years. The central component of the new architecture is a Linux-based multicore server, where individual cores replace the VME computers. The server is connected to the I/O via PCI-e based bus extenders, and every PCI-e connection is managed by a separate core. The system is supervised by MARTe, a software framework for real-time applications written in C++ and developed at JET and currently used for the JET vertical stabilization and in other fusion devices.

  2. Upgrade of the RFX-mod real time control system

    International Nuclear Information System (INIS)

    Manduchi, G.; Barbalace, A.; Luchetta, A.; Soppelsa, A.; Taliercio, C.; Zampiva, E.

    2012-01-01

    Highlights: ► The paper describes the experience in running the real-time control system of RFX-mod. ► It proposes a new architecture based multicore technology. ► It analyzes two different solutions for data acquisition. ► It discusses the effect of non simultaneous sampling in acquisition. ► It provides some preliminary performance measurements. - Abstract: The real-time control system of RFX-mod, in operation since 2005, has been successful and has allowed several important achievements in the RFX physics research program. As a consequence of this fact, new control algorithms are under investigation, which are more demanding in terms of both enhanced computing power and reduced system latency, currently around 1.5 ms. For this reason, a major upgrade of the system is being considered, and a new architecture has been proposed, taking advantage of the rapid evolution of computer technology in the last years. The central component of the new architecture is a Linux-based multicore server, where individual cores replace the VME computers. The server is connected to the I/O via PCI-e based bus extenders, and every PCI-e connection is managed by a separate core. The system is supervised by MARTe, a software framework for real-time applications written in C++ and developed at JET and currently used for the JET vertical stabilization and in other fusion devices.

  3. EBR-II Cover Gas Cleanup System upgrade process control system structure

    International Nuclear Information System (INIS)

    Carlson, R.B.; Staffon, J.D.

    1992-01-01

    The Experimental Breeder Reactor II (EBR-II) Cover Gas Cleanup System (CGCS) control system was upgraded in 1991 to improve control and provide a graphical operator interface. The upgrade consisted of a main control computer, a distributed control computer, a front end input/output computer, a main graphics interface terminal, and a remote graphics interface terminal. This paper briefly describes the Cover Gas Cleanup System and the overall control system; describes the main control computer hardware and system software features in more detail; and, then, describes the real-time control tasks, and how they interact with each other, and how they interact with the operator interface task

  4. EBR-II Cover Gas Cleanup System upgrade distributed control and front end computer systems

    International Nuclear Information System (INIS)

    Carlson, R.B.

    1992-01-01

    The Experimental Breeder Reactor II (EBR-II) Cover Gas Cleanup System (CGCS) control system was upgraded in 1991 to improve control and provide a graphical operator interface. The upgrade consisted of a main control computer, a distributed control computer, a front end input/output computer, a main graphics interface terminal, and a remote graphics interface terminal. This paper briefly describes the Cover Gas Cleanup System and the overall control system; gives reasons behind the computer system structure; and then gives a detailed description of the distributed control computer, the front end computer, and how these computers interact with the main control computer. The descriptions cover both hardware and software

  5. The SNS Resonance Control Cooling System Control Valve Upgrade Performance

    International Nuclear Information System (INIS)

    Williams, Derrick C.; Schubert, James Phillip; Tang, Johnny Y.

    2008-01-01

    The normal-conducting linac of the Spallation Neutron Source (SNS) uses 10 separate Resonance Control Cooling System (RCCS) water skids to control the resonance of 6 Drift Tube Linac (DTL) and 4 Coupled Cavity Linac (CCL) accelerating structures. The RCCS water skids use 2 control valves; one to regulate the chilled water flow and the other to bypass water to a chilled water heat exchanger. These valves have hydraulic actuators that provide position and feedback to the control system. Frequency oscillations occur using these hydraulic actuators due to their coarse movement and control of the valves. New pneumatic actuator and control positioners have been installed on the DTL3 RCCS water skid to give finer control and regulation of DTL3 cavity temperature. This paper shows a comparison of resonance control performance for the two valve configurations.

  6. Analysis and upgrade of instrumentation and control systems for the modernization of research reactors

    International Nuclear Information System (INIS)

    1988-01-01

    This document provides assistance in the review and planning process for the upgrade of instrumentation and control systems (I and C systems) and related safety features of the reactor protection system for research reactors. In the interest of safety a need was realized to evaluate the performance of outdated I and C systems. An advisory group was assembled to develop guidelines and to provide recommendations for the upgrade of I and C systems. The recommendations on I and C systems upgrade contained in this document were developed by the advisory group using as guidelines the established safety criteria and operating standards for research reactors. 24 refs

  7. Upgradation in SCADA and PLC of existing LN_2 control system for SST-1

    International Nuclear Information System (INIS)

    Panchal, Pradip; Mahesuria, Gaurang; Panchal, Rohit; Patel, Rakesh; Sonara, Dashrath; Pitroda, Dipen; Nimavat, Hiren; Tanna, Vipul; Pradhan, Subrata

    2016-01-01

    Highlights: • The control system of LN_2 Management System of SST-1 is designed on PLC and SCADA. • The implementation and results of up-gradation in PLC and SCADA are reported. • The up-gradation in PLC and SCADA has improved the reliability & availability of SST-1 LN_2 system. - Abstract: Helium Refrigerator/Liquefier system of Steady State Superconducting Tokamak (SST-1) incorporates Liquid Nitrogen (LN_2) pre-cooling system. LN_2 is used for 80 K thermal shields of SST-1, current feeder system and integrated flow distribution and control system. The LN_2 management system is distributed system and requires automatic control. Initially LN_2 control system had Citect based Supervisory Control and Data Acquisition (SCADA) and Koyo make Programmable Logic Controller (PLC). With the passage of time and due to unavailability of their hardware, it is being obsoleted. So, the requirements of new PLC and SCADA systems have been envisaged to make uninterruptable operation of SST-1 cryogenic system. Therefore, Wonderware SCADA and Schneider Electric make PLC is programmed to replace Citect SCADA and Koyo PLC. New control features have been added in upgraded control system for better management of LN_2 system. This upgradation of SCADA and PLC is completed, tested successfully and in operation. Operational performance highlights of the new upgraded system are presented in this paper.

  8. Upgradation in SCADA and PLC of existing LN{sub 2} control system for SST-1

    Energy Technology Data Exchange (ETDEWEB)

    Panchal, Pradip, E-mail: pradip@ipr.res.in; Mahesuria, Gaurang; Panchal, Rohit; Patel, Rakesh; Sonara, Dashrath; Pitroda, Dipen; Nimavat, Hiren; Tanna, Vipul; Pradhan, Subrata

    2016-11-15

    Highlights: • The control system of LN{sub 2} Management System of SST-1 is designed on PLC and SCADA. • The implementation and results of up-gradation in PLC and SCADA are reported. • The up-gradation in PLC and SCADA has improved the reliability & availability of SST-1 LN{sub 2} system. - Abstract: Helium Refrigerator/Liquefier system of Steady State Superconducting Tokamak (SST-1) incorporates Liquid Nitrogen (LN{sub 2}) pre-cooling system. LN{sub 2} is used for 80 K thermal shields of SST-1, current feeder system and integrated flow distribution and control system. The LN{sub 2} management system is distributed system and requires automatic control. Initially LN{sub 2} control system had Citect based Supervisory Control and Data Acquisition (SCADA) and Koyo make Programmable Logic Controller (PLC). With the passage of time and due to unavailability of their hardware, it is being obsoleted. So, the requirements of new PLC and SCADA systems have been envisaged to make uninterruptable operation of SST-1 cryogenic system. Therefore, Wonderware SCADA and Schneider Electric make PLC is programmed to replace Citect SCADA and Koyo PLC. New control features have been added in upgraded control system for better management of LN{sub 2} system. This upgradation of SCADA and PLC is completed, tested successfully and in operation. Operational performance highlights of the new upgraded system are presented in this paper.

  9. Upgrade of a control system for the JAERI ERL-FEL

    International Nuclear Information System (INIS)

    Kikuzawa, Nobuhiro

    2004-01-01

    The accelerator control system used for the JAERI ERL-FEL is a PC-based distributed control system that has been in operation since 1992. Since an interface bus of the PCs is obsolete, interface boards for the PCs are difficult to obtain in recent years. Thus we have been developing the CAMAC controller with μITRON operating system to replace the old PCs connected with CAMAC. We will introduce a Java and CORBA environment in the new control system. The control system upgrade, including hardware upgrading and applications rewriting, is described in this paper. (author)

  10. Transforming the ASDEX Upgrade discharge control system to a general-purpose plasma control platform

    International Nuclear Information System (INIS)

    Treutterer, Wolfgang; Cole, Richard; Gräter, Alexander; Lüddecke, Klaus; Neu, Gregor; Rapson, Christopher; Raupp, Gerhard; Zasche, Dieter; Zehetbauer, Thomas

    2015-01-01

    Highlights: • Control framework split in core and custom part. • Core framework deployable in other fusion device environments. • Adaptible through customizable modules, plug-in support and generic interfaces. - Abstract: The ASDEX Upgrade Discharge Control System DCS is a modern and mature product, originally designed to regulate and supervise ASDEX Upgrade Tokamak plasma operation. In its core DCS is based on a generic, versatile real-time software framework with a plugin architecture that allows to easily combine, modify and extend control function modules in order to tailor the system to required features and let it continuously evolve with the progress of an experimental fusion device. Due to these properties other fusion experiments like the WEST project have expressed interest in adopting DCS. For this purpose, essential parts of DCS must be unpinned from the ASDEX Upgrade environment by exposure or introduction of generalised interfaces. Re-organisation of DCS modules allows distinguishing between intrinsic framework core functions and device-specific applications. In particular, DCS must be prepared for deployment in different system environments with their own realisations for user interface, pulse schedule preparation, parameter server, time and event distribution, diagnostic and actuator systems, network communication and data archiving. The article explains the principles of the revised DCS structure, derives the necessary interface definitions and describes major steps to achieve the separation between general-purpose framework and fusion device specific components.

  11. Transforming the ASDEX Upgrade discharge control system to a general-purpose plasma control platform

    Energy Technology Data Exchange (ETDEWEB)

    Treutterer, Wolfgang, E-mail: Wolfgang.Treutterer@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Cole, Richard [Unlimited Computer Systems, Seeshaupter Str. 15, 82393 Iffeldorf (Germany); Gräter, Alexander [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Lüddecke, Klaus [Unlimited Computer Systems, Seeshaupter Str. 15, 82393 Iffeldorf (Germany); Neu, Gregor; Rapson, Christopher; Raupp, Gerhard; Zasche, Dieter; Zehetbauer, Thomas [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany)

    2015-10-15

    Highlights: • Control framework split in core and custom part. • Core framework deployable in other fusion device environments. • Adaptible through customizable modules, plug-in support and generic interfaces. - Abstract: The ASDEX Upgrade Discharge Control System DCS is a modern and mature product, originally designed to regulate and supervise ASDEX Upgrade Tokamak plasma operation. In its core DCS is based on a generic, versatile real-time software framework with a plugin architecture that allows to easily combine, modify and extend control function modules in order to tailor the system to required features and let it continuously evolve with the progress of an experimental fusion device. Due to these properties other fusion experiments like the WEST project have expressed interest in adopting DCS. For this purpose, essential parts of DCS must be unpinned from the ASDEX Upgrade environment by exposure or introduction of generalised interfaces. Re-organisation of DCS modules allows distinguishing between intrinsic framework core functions and device-specific applications. In particular, DCS must be prepared for deployment in different system environments with their own realisations for user interface, pulse schedule preparation, parameter server, time and event distribution, diagnostic and actuator systems, network communication and data archiving. The article explains the principles of the revised DCS structure, derives the necessary interface definitions and describes major steps to achieve the separation between general-purpose framework and fusion device specific components.

  12. A new readout control system for the LHCb upgrade at CERN

    International Nuclear Information System (INIS)

    Alessio, F; Jacobsson, R

    2012-01-01

    The LHCb experiment has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity. The entire readout architecture will be upgraded in order to cope with higher sub-detector occupancies, higher rate and higher network load. In this paper, we describe the architecture, functionalities and a first hardware implementation of a new fast Readout Control system for the LHCb upgrade, which will be entirely based on FPGAs and bi-directional links. We also outline the real-time implementations of the new Readout Control system, together with solutions on how to handle the synchronous distribution of timing and synchronous information to the complex upgraded LHCb readout architecture. One section will also be dedicated to the control and usage of the newly developed CERN GBT chipset to transmit fast and slow control commands to the upgraded LHCb Front-End electronics. At the end, we outline the plans for the deployment of the system in the global LHCb upgrade readout architecture.

  13. Limerick BWR turbine control and protection system upgrade success

    International Nuclear Information System (INIS)

    Tang, C.K.; Pietryka, T.S.; Federico, P.A.; Williams, J.C.

    2015-01-01

    Westinghouse and Exelon have successfully implemented a digital electro-hydraulic control (DEHC) at Limerick BWR Unit 1 Station to perform the turbine control, protection and reactor pressure functions. The DEHC replaces analog controls and addressed system performance, obsolescence and reliability. This was a first-of-a-kind application for control and protection of the main turbine and BWR pressure control for the distributed control system utilized. The demolition of analog equipment, main control room and front standard modifications, and acceptance testing were completed on schedule during the normal 2014 outage. Key aspects of the project that facilitated this success will be discussed and presented. (author)

  14. Limerick BWR turbine control and protection system upgrade success

    Energy Technology Data Exchange (ETDEWEB)

    Tang, C.K.; Pietryka, T.S.; Federico, P.A., E-mail: tangck@westinghouse.com, E-mail: pietryt@westinghouse, E-mail: federipa@westinghouse.com [Westinghouse Electric Company, LLC, Cranberry Township, PA (United States); Williams, J.C., E-mail: Jonathan.Williams@exeloncorp.com [Exelon Nuclear, Warrenville, IL (United States)

    2015-07-01

    Westinghouse and Exelon have successfully implemented a digital electro-hydraulic control (DEHC) at Limerick BWR Unit 1 Station to perform the turbine control, protection and reactor pressure functions. The DEHC replaces analog controls and addressed system performance, obsolescence and reliability. This was a first-of-a-kind application for control and protection of the main turbine and BWR pressure control for the distributed control system utilized. The demolition of analog equipment, main control room and front standard modifications, and acceptance testing were completed on schedule during the normal 2014 outage. Key aspects of the project that facilitated this success will be discussed and presented. (author)

  15. Plant control system upgrades in the context of industry trends towards plant life-extension

    International Nuclear Information System (INIS)

    De Grosbois, J.; Basso, R.; Hepburn, A.; Kumar, V.

    2002-01-01

    Domestic CANDU nuclear plants were brought online between 1972 and 1986. Over the next decade, most of these stations will be nearing the end of their designed operating life. Effort has traditionally been placed on ensuring that the existing installed plant control system equipment could operate reliably until the end of this design life. Until recently, little attention has been given to plant control system upgrades or replacements to meet the expected requirement for 30+ years of additional plant operation following potential plant refurbishments. Industry developments are changing this thinking. The combination of expected increases in electricity demand (and prices), and the many recent successful turnaround stories of U.S. nuclear power plants has resulted in new interest in plant life improvement and plant life extension programs. Plant control system upgrade decisions are now being driven by the need to replace or upgrade these systems to support plant life extension. This article is the first of several that investigate aspects of plant control system upgrades or replacement, specifically in the context of the CANDU station digital control computers (DCCs). It sets the context for the discussion in the subsequent articles by providing a brief review of industry trends favouring plant refurbishment, by outlining the basic issues of aging and obsolescence of control system equipment, by establishing the need for upgrades and replacements, and by introducing some of the basic challenges to be addressed by the industry as it moves forward. (author)

  16. 241-SY-101 data acquisition and control system (DACS) operator interface upgrade operational test report

    International Nuclear Information System (INIS)

    ERMI, A.M.

    1999-01-01

    This procedure provides instructions for readiness of the first portion of the upgraded 241-SY-101 Data Acquisition and Control System (DACS) computer system to provide proper control and monitoring of the mitigation mixer pump and instrumentation installed in the 241-SY-101 underground storage tank will be systematically evaluated by the performance of this procedure

  17. VME multiprocessor system for plasma control at the JT-60 Upgrade

    International Nuclear Information System (INIS)

    Kimura, T.; Kurihara, K.; Takahashi, M.; Kawamata, Y.; Akasaka, H.; Matsukawa, M.

    1989-01-01

    In this paper design and preliminary tests are reported of a VME multiprocessor system for the JT-60 Upgrade plasma control utilizing three MC88100 based RISC computers and VME buses. The design of the VME system was stimulated by faster and more accurate computation requirements for the plasma position and shape control

  18. Risk Assessment on the Transition Program for Air Traffic Control Automation System Upgrade

    Directory of Open Access Journals (Sweden)

    Li Dong Bin

    2016-01-01

    Full Text Available We analyzed the safety risks of the transition program for Air Traffic Control (ATC automation system upgrade by using the event tree analysis method in this paper. We decomposed the occurrence progress of the three transition phase and built the event trees corresponding to the three stages, and then we determined the probability of success of each factor and calculated probability of success of the air traffic control automation system upgrade transition. In the conclusion, we illustrate the transition program safety risk according to the results.

  19. Upgrading the control system for the Accelerators at the Svedberg Laboratory

    International Nuclear Information System (INIS)

    Gajewski, K.J.; Thuresson, L.; Johansson, O.

    1992-01-01

    Two accelerators at The Svedberg Laboratory in Uppsala, the Gustaf Werner cyclotron and the CELSIUS ring, will get a new control system. At present both the cyclotron and the ring have their own control systems based on S99 and PDP-11 minicomputers respectively. There are also a number of subsystems which are controlled separately from the stand-alone PC based consoles (ECR ion source, electron cooler, vacuum system). The goal of the rejuvenation is to integrate all existing control systems and provide the new system with an uniform operators interface based on workstations. The obsolete S99 microcomputers will be substituted with a VME system and all subsystems will be connected to the Ethernet. The upgrade strategy enabling the transformation of the system without any long shut-down period is discussed. Hardware and software planned for the upgrade is presented together with a discussion of expected problems. (author)

  20. Work plan for upgrading the 241-A-701 compressed air system and motor control center. Revision 1

    International Nuclear Information System (INIS)

    Carpenter, K.E.

    1995-01-01

    This work plan will outline the responsibilities associated with the 241-A-701 Compressed Air System (CAS) and Motor Control Center (MCC) upgrades. All activities required to design, install, test, and operate the modified systems are addressed in this document. Upgrades Technical Support (UTS) of TWRS Engineering is responsible for the completion of all tasks associated with this upgrade. UTS will coordinate the upgrade activities, and ensure all tasks are successfully completed on or before the scheduled dates. The primary objective of the 241-A-701 Compressor and MCC Upgrade is to provide a reliable source of process and instrument compressed air to the A, AX, AY, and AZ tank farms

  1. Program planning for large-scale control system upgrades

    International Nuclear Information System (INIS)

    Madani, M.; Giajnorio, J.; Richard, T.; Ho, D.; Volk, W.; Ertel, A.

    2011-01-01

    Bruce Power has been planning to replace the Bruce A Fuel Handling (FH) computer systems including the Controller and Protective computers for many years. This is a complex project, requiring an extended FH outage. To minimize operational disruption and fully identify associated project risks, Bruce Power is executing the project in phases starting with the Protective Computer replacement. GEH-C is collaborating with Bruce Power in a Preliminary Engineering (PE) phase to generate a project plan including specifications, budgetary cost, schedule, risks for the Protective computer replacement project. To assist Bruce Power in its evaluation, GEH-C's is using 6-Sigma methodologies to identify and rank Critical to Quality (CTQ) requirements in collaboration with Bruce Power Maintenance, Operations, Plant Design and FH Engineering teams. PE phase established the project scope, hardware and software specifications, material requirements and finally concluded with a recommended hardware platform and approved controls architecture.

  2. EBR-II secondary sodium loop Plugging Temperature Indicator control system upgrade

    International Nuclear Information System (INIS)

    Carlson, R.B.; Gehrman, R.L.

    1995-01-01

    The Experimental Breeder Reactor II (EBR-II) secondary sodium coolant loop Plugging Temperature Indicator (PTI) control system was upgraded in 1993 to a real-time computer based system. This was done to improve control, to remove obsolete and high maintenance equipment, and to provide a graphical CRT based operator interface. A goal was to accomplish this inexpensively using small, reliable computer and display hardware with a minimum of purchased software. This paper describes the PTI system, the upgraded control system and its operator interface, and development methods and tools. The paper then assesses how well the system met its goals, discusses lessons learned and operational improvements noted, and provides some recommendations and suggestions on applying small real-time control systems of this type

  3. Fermilab linac upgrade side coupled cavity temperature control system

    International Nuclear Information System (INIS)

    Crisp, J.; Satti, J.

    1991-05-01

    Each cavity section has a temperature control system which maintains the resonant frequency by exploiting the 17.8 ppm/degree C frequency sensitivity of the copper cavities. Each accelerating cell has a cooling tube brazed azimuthally to the outside surface. Alternate supply and return connection to the water manifolds reduce temperature gradients and maintain physical alignment of the cavity string. Special tubing with spiral inner fins and large flow rate are used to reduce the film coefficient. Temperature is controlled by mixing chilled water with the water circulating between the cavity and the cooling skid located outside the radiation enclosure. Chilled water flow is regulated with a valve controlled by a local microcomputer. The temperature loop set point will be obtained from a slower loop which corrects the phase error between the cavity section and the rf drive during normal beam loaded conditions. Time constants associated with thermal gradients induced in the cavity with the rf power require programming it to the nominal 7.1 MW level over a 1 minute interval to limit the reverse power. 4 refs., 4 figs

  4. Doosan Experience on I and C Upgrade for Operating NPPs: Control Rod Control System and Automatic Seismic Trip System

    International Nuclear Information System (INIS)

    Nam, C.H.; Kim, K.H.; Lee, D.H.

    2012-01-01

    This paper describes DHIC's experience on upgrading 3 coil type control rod control system(CRCS), 4 coil type control element drive mechanism control system(CEDMCS) and automatic seismic trip system(ASTS). Common main feature of the above systems are full duplex system to prevent unwanted trip and mis-operation. 5 CRCS and CEDMCS have been supplied to Kori 1,2, Ulchin 1,2 and Younggwang 3 since 2010 and 7 CEDMCS are contracted to supply Korea Hydro and Nuclear Power Co.(KHNP) site. Also 16 ASTS are supplied and 12 ASTS will be supplied to operating and new NPPs within 3 years. (author)

  5. Backward compatibility as a key measure for smooth upgrades to the LHC control system

    International Nuclear Information System (INIS)

    Baggiolini, V.; Csikos, D.; Tarasenko, P.; Zaharieva, Z.; Arruat, M.; Gorbosonov, R.

    2012-01-01

    It is a big challenge to smoothly upgrade the control system of a large operational accelerator such as the LHC without causing unnecessary downtime. We have identified backward compatibility as a key measure to achieve this, because a backward compatible component can be easily upgraded. This document describes the work the CERN Accelerator Controls group does to provide methods and tools supporting backward compatibility. We have identified four areas for which we want to provide tools: (1) dependency analysis to identify incoming dependencies, (2) backward compatibility validation to verify that API (Application Program Interface) changes are really backward compatible, (3) version upgrading with rules to clearly inform the dependent clients if a modification is backward compatible, and (4) API consolidation to clearly specify classes and methods belonging to the API and to enforce their appropriate usage

  6. System-level Specifications of the Timing and Fast Control system for the LHCb Upgrade

    CERN Document Server

    Alessio, Federico

    2014-01-01

    The LHCb experiment has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times the initial design luminosity. The various sub-systems in the readout architecture will need to be upgraded in order to cope with higher sub-detector occupancies, higher rate and higher network load. In this paper, we describe the specifications of the new Timing and Fast Control (S- TFC) system. We define the requirements for the new S-TFC, and specify its architecture and the individual components. The system is based on a single new Readout Supervisor (S-ODIN) instantiating several S-TFC masters to allow partitioning. The communication with the readout electronics is ensured by a shared high-speed optical link network for both the distribution of timing and synchronous control information, as well as trigger/throttle communication. An interface board (SOL40) with fan-out capabilities for timing and synchronous information and fan-in capabilities for throttle and rate regulation of the...

  7. The upgrade and re-validation of the Compact Muon Solenoid Electromagnetic Calorimeter Control System

    CERN Multimedia

    Holme, Oliver; Di Calafiori, Diogo; Dissertori, Günther; Djambazov, Lubomir; Jovanovic, Dragoslav; Lustermann, Werner; Zelepoukine, Serguei

    2013-01-01

    The Electromagnetic Calorimeter (ECAL) is one of the sub-detectors of the Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) at CERN. The Detector Control System (DCS) that has been developed and implemented for the CMS ECAL was deployed in accordance with the LHC schedule and has been supporting the CMS data-taking since LHC physics runs started in 2009. During these years, the control system has been regularly adapted according to operational experience and new requirements, always respecting the constraints imposed on significant changes to a running system. Several hardware and software upgrades and system extensions were therefore deferred to the first LHC Long Shutdown (LS1). This paper presents the main architectural differences between the system that supported the CMS ECAL during its first years and the new design for the coming physics runs after LS1. Details on the upgrade planning, including the certification methods performed in the CMS ECAL DCS laboratory facilities, repor...

  8. Upgrade plan for the control system of the KEK e-/e+ linac

    International Nuclear Information System (INIS)

    Furukawa, K.; Kamikubota, N.; Nakahara, K.; Abe, I.

    1992-01-01

    The KEK 2.5-GeV linac has been operating since 1982. However, in order to maintain reliable operation, the control system should be upgraded within a few years. We plan to replace the minicomputers and the main network connecting them. Thus, the architecture of the control software will also be revised. In the new system we should adopt software and hardware standards. In the next control system we will employ the TCP/IP (DARPA) protocol suite for the main network and Unix workstations to replace the minicomputers. For connections to the local controllers, VME bus (IEEE 1014) will be utilized. (author)

  9. The upgraded control and instrumentation system of C5 irradiation device

    International Nuclear Information System (INIS)

    Iordache, A.; Ancuta, M.; Gruia, L.; Pulpa, A.; Salistean, E.; Gusescu, G.

    2013-01-01

    C5 capsule is an irradiation device of TRIGA SSR, which is designed for irradiation of structural materials in an inert environment for mechanical behavior characterization and the material microstructure evolution during irradiation. The paper presents the upgraded control and instrumentation system of the C5 irradiation device which was designed and manufactured to enhance the performance of this system for better surveillance and processing the acquired experimental data. (authors)

  10. Upgrade of the COMPASS tokamak real-time control system

    Czech Academy of Sciences Publication Activity Database

    Janky, Filip; Havlíček, Josef; Batista, A.J.N.; Kudláček, Ondřej; Seidl, Jakub; Neto, A.C.; Pipek, Jan; Hron, Martin; Mikulín, Ondřej; Duarte, A.S.; Carvalho, B.B.; Stöckel, Jan; Pánek, Radomír

    2014-01-01

    Roč. 89, č. 3 (2014), s. 186-194 ISSN 0920-3796 R&D Projects: GA ČR GAP205/11/2470; GA MŠk 7G10072; GA MŠk(CZ) LM2011021 Institutional support: RVO:61389021 Keywords : Real-time * Feedback control * Real-time framework * MARTe * COMPASS tokamak Subject RIV: BL - Plasma and Gas Discharge Physics Impact factor: 1.152, year: 2014 http://www.sciencedirect.com/science/article/pii/S0920379613007564

  11. Active control system upgrade design for lower hybrid current drive system on Alcator C-Mod

    Energy Technology Data Exchange (ETDEWEB)

    Kanojia, A.D., E-mail: akanojia@mit.edu [Massachusetts Institute of Technology Plasma Science and Fusion Center, Cambridge, MA (United States); Wallace, G.M.; Terry, D.R.; Stillerman, J.A.; Burke, W.M.; MacGibbon, P.A.; Johnson, D.K. [Massachusetts Institute of Technology Plasma Science and Fusion Center, Cambridge, MA (United States)

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer Initial tests of the Hittite microwave components show good or better control of phase and amplitude when compared to the vector modulators used in the current system. Black-Right-Pointing-Pointer With an analog based control component system the system complexity is dramatically reduced. Black-Right-Pointing-Pointer Historically, D-tAcq hardware/software has performed more reliably on DPCS and FFT controllers than the current lower hybrid control system Black-Right-Pointing-Pointer Cost and lead time of the Hittite microwave components is significantly small compared to vector modulators. - Abstract: As a part of the scheduled expansion of the Alcator C-Mod lower hybrid current drive (LHCD) system from 12 to 16 klystrons to accommodate installation of a second LH antenna, the active control system (ACS) is being redesigned to accommodate the additional klystrons. Digitizers and output modules will be cPCI modules provided by D-tAcq Solutions. The real-time application will run on a standard PC server running Linux. Initially, the new ACS system will be designed to control 8 klystrons on the second LH antenna and the existing ACS will control the remaining 8 klystrons on the existing LH antenna. Experience gained operating the existing LHCD system has given us insight into the design of a more robust, compact, efficient and simple system for the new ACS. The design upgrade will be patterned on the digital plasma control system (DPCS [1]) in use on C-Mod.

  12. The upgraded PSI application in the BEPCⅡ power supply control system

    International Nuclear Information System (INIS)

    Li Jiangqi; Wang Xiaoli; Wang Chunhong; Liu Jia

    2011-01-01

    There are about 460 magnet power supplies in the two rings and the transport lines of the BEPCⅡ which are controlled by the power supply controller and the power supply interface. An upgraded Power Supply Interface (PSI-Ⅱ) was developed for replacing the old one in the power supply control system of the BEPCⅡ. It will firstly describe feature of the PSI-Ⅱ and difference from the PSI. Then, discuss performance test of the PSI-Ⅱ well as its application in the power supply control system. (authors)

  13. Applications of small computers for systems control on the Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Bork, R.G.; Kane, R.J.; Moore, T.L.

    1983-01-01

    Desktop computers operating into a CAMAC-based interface are used to control and monitor the operation of the various subsystems on the Tandem Mirror Experiment-Upgrade (TMX-U) at Lawrence Livermore National Laboratory (LLNL). These systems include: shot sequencer/master timing, neutral beam control (four consoles), magnet power system control, ion-cyclotron resonant heating (ICRH) control, thermocouple monitoring, getter system control, gas fueling system control, and electron-cyclotron resonant heating (ECRH) monitoring. Two additional computers are used to control the TMX-U neutral beam test stand and provide computer-aided repair/test and development of CAMAC modules. These machines are usually programmed in BASIC, but some codes have been interpreted into assembly language to increase speed. Details of the computer interfaces and system complexity are described as well as the evolution of the systems to their present states

  14. TA-55 facility control system upgrade project - human-system interface functional requirements

    International Nuclear Information System (INIS)

    Atkins, W.H.; Pope, N.G.; Turner, W.J.; Brown, R.E.

    1995-11-01

    The functional requirements for that part of the Technical Area (TA)-55 Operations Center Upgrade Project that involves the human-system interface (HSI) are described in this document. The upgrade project seeks to replace completely the center's existing computerized data acquisition and display system, which consists of the field multiplexer units, Data General computer systems, and associated peripherals and software. The upgrade project has two parts-the Facility Data Acquisition Interface System (FDAIS) and the HSI. The HSI comprises software and hardware to provide a high-level graphical operator interface to the data acquisition system, as well as data archiving, alarm annunciation, and logging. The new system will be built with modern, commercially available components; it will improve reliability and maintainability, and it can be expanded for future needs

  15. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    International Nuclear Information System (INIS)

    Kelley, S.; Bolian, T. W.

    2006-01-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations

  16. DIII-D tokamak control and neutral beam computer system upgrades

    International Nuclear Information System (INIS)

    Penaflor, B.G.; McHarg, B.B.; Piglowski, D.A.; Pham, D.; Phillips, J.C.

    2004-01-01

    This paper covers recent computer system upgrades made to the DIII-D tokamak control and neutral beam computer systems. The systems responsible for monitoring and controlling the DIII-D tokamak and injecting neutral beam power have recently come online with new computing hardware and software. The new hardware and software have provided a number of significant improvements over the previous Modcomp AEG VME and accessware based systems. These improvements include the incorporation of faster, less expensive, and more readily available computing hardware which have provided performance increases of up to a factor 20 over the prior systems. A more modern graphical user interface with advanced plotting capabilities has improved feedback to users on the operating status of the tokamak and neutral beam systems. The elimination of aging and non supportable hardware and software has increased overall maintainability. The distinguishing characteristics of the new system include: (1) a PC based computer platform running the Redhat version of the Linux operating system; (2) a custom PCI CAMAC software driver developed by general atomics for the kinetic systems 2115 serial highway card; and (3) a custom developed supervisory control and data acquisition (SCADA) software package based on Kylix, an inexpensive interactive development environment (IDE) tool from borland corporation. This paper provides specific details of the upgraded computer systems

  17. Performing instrumentation and controls upgrades

    International Nuclear Information System (INIS)

    Kessler, F. M.; Connell, T. J.; Ryan, M. P.

    1992-01-01

    I and C upgrades are comprised of a varying range of content, complexity, expansiveness, and criticality. There are common threads in all upgrades which can be simplified by the development of a long term I and C upgrade plan. The development of a such a plan can establish effective ground rules for upgrades, large and small. It can be the basis from which to begin an upgrade evaluation and the standard which is used to compare the degree of compliance of any upgrade regarding the plan or to define the differences from the plan and an individual upgrade. Primary motivation for I and C upgrades are obsolescence and unavailability of spare parts. Numerous other areas of consideration are also involved in an upgrade. Today's technology results in most upgrades largely or totally utilizing digital equipment. The use of digital equipment is fairly new in many I and C applications and requires an elaborate evaluation from functional, qualification, operational, and licensing perspectives as well as others. A well defined upgrade plan developed as a basis for I and C upgrades is a significant start to ensuring an effective upgrade process. Properly developed and implemented, the plan will support I and C upgrade efforts to ensure that the intricacies associated with such tasks eliminate the existing problems which require the upgrade to be performed. The upgrade plan also results in ensuring the maximum benefit from all perspectives of the plant enhancements being carried out and considered for future implementation. Instrumentation and controls aging and replacement are issues of growing importance due to the potential for significant impact on plant operation and efficiency. Obsolescence and unavailability of spare parts are major drivers towards evaluating the cost benefits of upgrading current equipment. In addition to these two primary factors, the advantages of utilizing digital equipment have also become of prime importance when evaluating instrumentation and

  18. New drive converter and digital control for the pulsed power supply system of ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Käsemann, Claus-Peter, E-mail: c.p.kaesemann@ipp.mpg.de [Max Planck Institute for Plasma Physics, Boltzmannstraße 2, 85748 Garching (Germany); Jacob, Christian; Nguyen, Hong Ha; Stobbe, Ferdinand; Mayer, Alois [Max Planck Institute for Plasma Physics, Boltzmannstraße 2, 85748 Garching (Germany); Sachs, Edgar; Klein, Reiner [Siemens AG, Industrial Automation Systems, Gleiwitzer Straße 555, 90475 Nürnberg (Germany)

    2015-10-15

    Highlights: • IGBT converter system with integrated control. • Proven technology reduces time and budget. • Flexibility to be integrated into a 35 years old installation. • Stable control algorithms for static and dynamic speed control. • Possibilities for active and reactive power management. - Abstract: Safety and reliability are major issues for the ASDEX Upgrade (AUG) pulsed power supply systems. To avoid long downtimes during an experimental campaign, fault-prone components have to be identified and treated early. This becomes even more important due to the AUG participation in the EUROfusion Medium Sized Tokamak (MST) program. Operating equipment which is up to 40 years old adds additional complications. This contribution describes one such example where a 35 year old flywheel generator at AUG was identified as fault-prone and pre-emptively upgraded with a new drive converter with integrated control. Most challenging was to adapt a modern converter, originally designed for wind turbines, toward a drive system for a flywheel-motor-generator system. To identify the layout of the controller and the control parameters, accurate modeling and comprehensive simulations were performed. This effort paid off during commissioning and measuring results verified the calculated design values. Finally, the system shows good performance during AUG plasma experiments.

  19. Upgrade to the Tritium Remote Control and Monitoring System for TFTR D and D

    International Nuclear Information System (INIS)

    Sichta, P.; Oliaro, G.; Sengupta, S.

    2002-01-01

    Since 1988, the Tritium Remote Control and Monitoring System (TRECAMS) has performed crucial functions in support of D-T [deuterium-tritium] operations of the Tokamak Fusion Test Reactor (TFTR) at the Princeton Plasma Physics Laboratory (PPPL). Although plasma operations on TFTR were completed in 1997, the need for TRECAMS continued. During this period TRECAMS supported the TFTR tritium systems, the TFTR's Shutdown and Safing phase, and the TFTR Decontamination and Decommissioning (D and D) project. The most critical function of the TRECAMS in the post-TFTR era has been to provide a real-time indication of the airborne tritium levels in the tritium areas and the (HVAC) stacks. TRECAMS is a critical tool in conducting safe TFTR D and D tritium-line breaks and other tritium-related work activities. Beginning in 1998, the failure rate of the system's hardware sharply increased. Furthermore, the specialized knowledge required to maintain the original software and hardware was diminishing. It soon became apparent that a failure of the TRECAMS could significantly impact the TFTR D and D project's cost and schedule. To preclude this, the TRECAMS hardware and software was upgraded in the year 2000 to use modern components. This paper will describe that successful upgrade, including a review of the engineering processes and our operating experiences with the upgraded system

  20. Upgrading the data acquisition and control systems of the European Breeding Blanket Test Facility

    International Nuclear Information System (INIS)

    Mannori, Simone; Sermenghi, Valerio; Utili, Marco; Malavasi, Andrea; Gianotti, Daniel

    2013-01-01

    Highlights: • Data Acquisition and Control Systems (DACS) upgrading of experimental plant for full size thermo hydraulic testing of nuclear subsystems. • DACS development using integrated hardware/software platform with graphical programming (LabVIEW). • Development of simplified models for real-time simulation. • Rapid prototyping with real time simulation of the complete plant. • Using the code developed for the real time simulator for the real plant DACS. -- Abstract: The EBBTF (European Breeding Blanket Test Facility) experimental plant is a key component for the development of the breeding blankets (TBMs test blanket modules, HCLL helium cooled lithium lead and HCPB helium cooled pebble bed types) used by ITER. EBBTF is an experimental plant which provides the double breeding/cooling loops (liquid metal and gas) required for HCLL testing. EBBTF is composed of four subsystems (TBM, IELLLO integrated European lead lithium loop, HE-FUS3 helium fusion loop, version 3 and helium compressor build by ATEKO) with dedicated control systems realized with hardware/software combinations covering 15 years (1995–2010) time span. At the end of 2010 we began to upgrade the HE-FUS3 data acquisition control systems (DACS) replacing the obsolete PLC Siemens S5 with National Instruments Compact FieldPoint and LabVIEW. The control room has been completely reorganized using high resolution monitors and workstations linked with standard Ethernet interfaces. The data acquisition, control, safety and SCADA software has been completely developed in ENEA using LabVIEW. In this paper we are going to discuss the technical difficulties and the solutions that we have used to accomplish the upgrade

  1. Major upgrade of the articulated inspection arm control system to fulfill daily operation requirements

    Energy Technology Data Exchange (ETDEWEB)

    Pastor, P., E-mail: patrick.pastor@cea.fr [CEA, IRFM, Institut de Recherche sur la Fusion par confinement Magnétique (France); Villedieu, E.; Allegretti, L.; Vincent, B.; Barbuti, A.; Bruno, V.; Coquillat, P.; Dechelle, C.; Gargiulo, L.; Le, R.; Malard, P.; Martinez, A.; Nouailletas, R. [CEA, IRFM, Institut de Recherche sur la Fusion par confinement Magnétique (France); Yuntao, Song; Yong, Cheng; Chen, Liu; Hansheng, Feng; Shanshuang, Shi [ASIPP, Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui (China)

    2015-10-15

    Highlights: • We propose an overview of the work which has been done to upgrade the control system of the AIA robot (articulated inspection arm) to fulfill daily operation requirements for tokamak inspection. • The control system is based on the use of new position sensors, new electronics design and new supervisor software. • Final tests are ongoing in the EAST scale 1 tokamak mock-up. Routine operation of the robot at EAST will start in the beginning of 2015. - Abstract: An articulated inspection arm (AIA) has been developed by CEA for visual inspection between pulses inside the Tore Supra tokamak vacuum vessel without breaking temperature and vacuum conditions. The eight meters length robot is composed of a shuttle and six articulated segments with a video camera at its end. A demonstration prototype has been achieved in 2008 at Tore Supra (Gargiulo, 2007; Houry, 2008; Perrot, 2003). A project to upgrade the AIA into a fully operational robot has been undertaken by IRFM and ASIPP in an Associated Laboratory. It will be in operation first in the EAST machine and afterwards in Tore Supra in its WEST (W/Tungsten Environment in Steady-state Tokamak) configuration where it is of paramount importance to survey possible degradation of W component surface. The control system of the robot has been extensively upgraded. The effort has been focused on three areas: (1) improvement of the arm position accuracy, (2) increase of the operational robustness, (3) use of a powerful graphical user interface including simulation of trajectories and robot deployment capabilities in a 3D viewer environment. The aim of this paper is to detail the architecture of the AIA control system.

  2. Upgrade of the Nuclear Material Protection, Control and Accounting System at the VNIIEF Industrial Zone

    International Nuclear Information System (INIS)

    Lewis, J.C.; Maltsev, V.; Singh, S.P.

    1999-01-01

    The Industrial Zone at the Russian Federal Nuclear Center/All-Russian Scientific Research Institute of Experimental Physics (RFNC/VNEEF) consists of ten guarded areas with twenty two material balance areas (A and As). The type of facilities in the Industrial Zone include storage sites, machine shops, research facilities, and training facilities. Modernization of the Material Protection, Control and Accounting (MPC and A) System at the Industrial Zone started in 1997. This paper provides a description of, the methodology/strategy used in the upgrade of the MFC and A system

  3. Development of a VME multi-processor system for plasma control at the JT-60 Upgrade

    International Nuclear Information System (INIS)

    Takahashi, M.; Kurihara, K.; Kawamata, Y.; Akasaka, H.; Kimura, T.

    1992-01-01

    Design and initial operation results are reported of a VME multi-processor system [1] for plasma control at a large fusion device named 'the JT-60 Upgrade' utilizing three 32-bit MC88100 based RISC computers and VME components. Development of the system was stimulated by faster and more accurate computation requirements for the plasma position and current control. The RISC computers operate at 25 MHz along with two cashe memories named MC88200. We newly developed VME bus modules of up/down counter, analog-to-digital converter and clock pulse generator for measuring magnetic field and coil current and for synchronizing the processing in the three RISCs and direct digital controllers (DDCs) of magnet power supplies. We also evaluated that the speed of the data transfer between the VME bus system and the DDCs through CAMAC highways satisfies the above requirements. In the initial operation of the JT-60 upgrade, it has been proved that the VME multi-processor system well controls the plasma position and current with a sampling period of 250 μsec and a delay of 500 μsec. (author)

  4. Economic analysis for upgrade decision-making using a control system replacement example

    International Nuclear Information System (INIS)

    De Grosbois, J.; Wichman, R.; Hepburn, G.A.; Basso, R.; Kumar, V.; Deregowska, D.

    2006-01-01

    This paper (3rd in a CNS series) provides insight on how nuclear power plants can achieve better efficiencies and reduced operations and maintenance (O and M) costs by making well-informed equipment upgrade decisions. An investment decision in a plant system upgrade will have various technical options and associated performance outcomes. These can be modelled and evaluated using economic and financial analysis methods. The economic analysis usually involves a comparison of an investment scenario versus a no-investment scenario called difference case analysis. The investment may include several scenarios due to the existence of various options, different investment timings, or desired performance results. Classical approaches, using financial tools such as net present value and internal rate of return calculations, may be used to quantify the financial benefits of the difference cases when certainty about the outcomes is assumed. When making decisions under risk, the classical approaches may be augmented with methods that consider life-cycle costs and benefits, the cost consequences of and probability of equipment failure, the timing of the replacement, and the uncertainties in estimating costs and benefits. The use of expected value and Monte Carlo simulation, among others, allow the incorporation of financial and technical uncertainty into the analysis. Finally, sensitivity analysis enables better understanding of the problem and may improve the decision and clarify the level of confidence that should be put in the outcomes. This paper illustrates the use of financial decision analysis methods for equipment replacements using a control system upgrade example. These methods may easily be generalized for other types of plant upgrades. (author)

  5. Event detection and exception handling strategies in the ASDEX Upgrade discharge control system

    International Nuclear Information System (INIS)

    Treutterer, W.; Neu, G.; Rapson, C.; Raupp, G.; Zasche, D.; Zehetbauer, T.

    2013-01-01

    Highlights: •Event detection and exception handling is integrated in control system architecture. •Pulse control with local exception handling and pulse supervision with central exception handling are strictly separated. •Local exception handling limits the effect of an exception to a minimal part of the controlled system. •Central Exception Handling solves problems requiring coordinated action of multiple control components. -- Abstract: Thermonuclear plasmas are governed by nonlinear characteristics: plasma operation can be classified into scenarios with pronounced features like L and H-mode, ELMs or MHD activity. Transitions between them may be treated as events. Similarly, technical systems are also subject to events such as failure of measurement sensors, actuator saturation or violation of machine and plant operation limits. Such situations often are handled with a mixture of pulse abortion and iteratively improved pulse schedule reference programming. In case of protection-relevant events, however, the complexity of even a medium-sized device as ASDEX Upgrade requires a sophisticated and coordinated shutdown procedure rather than a simple stop of the pulse. The detection of events and their intelligent handling by the control system has been shown to be valuable also in terms of saving experiment time and cost. This paper outlines how ASDEX Upgrade's discharge control system (DCS) detects events and handles exceptions in two stages: locally and centrally. The goal of local exception handling is to limit the effect of an unexpected or asynchronous event to a minimal part of the controlled system. Thus, local exception handling facilitates robustness to failures but keeps the decision structures lean. A central state machine deals with exceptions requiring coordinated action of multiple control components. DCS implements the state machine by means of pulse schedule segments containing pre-programmed waveforms to define discharge goal and control

  6. Event detection and exception handling strategies in the ASDEX Upgrade discharge control system

    Energy Technology Data Exchange (ETDEWEB)

    Treutterer, W., E-mail: Wolfgang.Treutterer@ipp.mpg.de; Neu, G.; Rapson, C.; Raupp, G.; Zasche, D.; Zehetbauer, T.

    2013-10-15

    Highlights: •Event detection and exception handling is integrated in control system architecture. •Pulse control with local exception handling and pulse supervision with central exception handling are strictly separated. •Local exception handling limits the effect of an exception to a minimal part of the controlled system. •Central Exception Handling solves problems requiring coordinated action of multiple control components. -- Abstract: Thermonuclear plasmas are governed by nonlinear characteristics: plasma operation can be classified into scenarios with pronounced features like L and H-mode, ELMs or MHD activity. Transitions between them may be treated as events. Similarly, technical systems are also subject to events such as failure of measurement sensors, actuator saturation or violation of machine and plant operation limits. Such situations often are handled with a mixture of pulse abortion and iteratively improved pulse schedule reference programming. In case of protection-relevant events, however, the complexity of even a medium-sized device as ASDEX Upgrade requires a sophisticated and coordinated shutdown procedure rather than a simple stop of the pulse. The detection of events and their intelligent handling by the control system has been shown to be valuable also in terms of saving experiment time and cost. This paper outlines how ASDEX Upgrade's discharge control system (DCS) detects events and handles exceptions in two stages: locally and centrally. The goal of local exception handling is to limit the effect of an unexpected or asynchronous event to a minimal part of the controlled system. Thus, local exception handling facilitates robustness to failures but keeps the decision structures lean. A central state machine deals with exceptions requiring coordinated action of multiple control components. DCS implements the state machine by means of pulse schedule segments containing pre-programmed waveforms to define discharge goal and control

  7. The magnet power control system for the tandem mirror experiment-upgrade

    International Nuclear Information System (INIS)

    Bell, H.H.

    1983-01-01

    This paper describes the desktop computer/CAMAC based system that controls the power source for the Tandem Mirror Experiment-Upgrade (TMX-U) magnet power system. Presently it contains 42 dc rectifier power supplies connected to 24 magnet coils arranged in 17 circuits. During each shot, the system delivers 22.6 MW dc to the magnets for about 3 s. The system is presently being changed to add six power supplies, two solenoidal throttle coils, and two reverse C-coils. When complete, the delivered power will increase to 36.9 MW. The closed-loop control system usually provides current (and thus, magnetic field) that is within 1% of the requested current. Achieving this accuracy required using grounding, shielding, and isolation methods to reduce noise and related problems

  8. arXiv Architecture of the LHCb muon Frontend control system upgrade

    CERN Document Server

    Bocci, Valerio

    2016-10-06

    The LHCb experiment(Fig. 1), that is presently taking data at CERN (European Center for Nuclear Research) Large Hadron Collider (LHC), aims at the study of CP violation in the B meson sector. Its key elements is the Muon detector [1], which allows triggering, and muon identification from inclusive b decays. The electronic system (Fig. 2) of the whole detector is very complex and its Muon detector Experiment Control System (ECS) allows monitoring and control of a number of Front-End boards in excess of 7000. The present system in charge of controlling Muon detector Front-End (FE) Electronics consists of 10 Crates of equipment; each crate contains two kinds of modules: a Pulse Distribution Module (PDM) and up to 20 Service Boards (SB) connected via a custom Backplane for a total amount of about 800 microcontrollers[2]. LHCb upgrade is planned for 2018/19, which will allow the detector to exploit higher luminosity running. This upgrade will allow the experiment to accumulate more luminosity to allow measurements...

  9. Simulation of feedback control system for NTM stabilisation in ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Rapson, Christopher, E-mail: chris.rapson@ipp.mpg.de [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstrasse 2, 85748 Garching (Germany); Monaco, Francesco; Reich, Matthias; Stober, Joerg; Treutterer, Wolfgang [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstrasse 2, 85748 Garching (Germany)

    2013-10-15

    Highlights: ► Feedback loop to control the ECRH deposition location is modelled in Simulink. Controller optimised using simulation results. ► Apart from optimising the PID gain values, alternative architectures were trialed without risk to hardware. ► Off-normal events could be simulated, and the controller response improved. ► Optimised controller applied in experiment. Even for the low power used, partial stabilisation of NTM was observed. ► The simulation is useful outside its intended application, and for future developments of the NTM feedback control system. -- Abstract: Neoclassical Tearing Modes (NTMs) are a class of MHD instability in high beta tokamak plasmas which significantly increase radial transport, thus capping the performance of fusion plasmas. More importantly, NTMs can lead to disruptions which compromise the lifetime of structural components. Several tokamaks have demonstrated that Electron Cyclotron Resonant Heating (ECRH) can stabilise NTMs if the power deposition is aligned with the mode location. The deposition location depends on the toroidal magnetic field, flux and density profiles, and can be controlled by tilting the mirror in the ECRH launcher. Until recently, the mirror angle was set by feedforward control at ASDEX Upgrade. In order to adapt automatically to different discharge scenarios, the system at ASDEX Upgrade has been extended to steer the mirror using feedback control. The mirror must react on the current diffusion time scale, on the order of 100 ms. This is within the capabilities of the mechanical subsystem and real-time plasma diagnostics, but requires careful interfacing between these components. For example, asynchronous data transfer and non-linearities make it difficult to design an analytically optimal controller. Therefore a simulation has been used to test and tune different controller architectures. This simulation is the subject of the current contribution. Performing the optimisation process offline

  10. Remote upgrade and control system of NAT crossing based on mail protocol

    Directory of Open Access Journals (Sweden)

    Chen Lei

    2017-02-01

    Full Text Available This paper proposes a new scheme which uses transmits information such as related IP address and port by the mail server POP3 and SMTP protocol to realize net address turning (NAT crossing.The UDP connection between client and device node is realized by using "burrow" technology.Compared to the scheme that uses procedure server to realize NAT crossing schemes by the "burrow" technology,our scheme has advantages of saving operating costs,improving the stability of the system and enhancing the transferability of the system.With multiple equipment node,and a variety of network environment,we introduces the firmware update module,designs and realizes the remote upgrade and the control system of an intelligent device of Internet of Things based on the proposed scheme,and discusses the robustness of the system.

  11. Hardware-in-the-loop simulation of the EAST PF converter for PF control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Xiaojiao, E-mail: chenxj@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Science (ASIPP), P.O. Box 1126, Hefei, Anhui Province 230031 (China); Chinese University of Science and Technology, Hefei, Anhui Province 230022 (China); Fu, Peng [Institute of Plasma Physics, Chinese Academy of Science (ASIPP), P.O. Box 1126, Hefei, Anhui Province 230031 (China); Chinese University of Science and Technology, Hefei, Anhui Province 230022 (China); Huang, Liansheng, E-mail: huangls@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Science (ASIPP), P.O. Box 1126, Hefei, Anhui Province 230031 (China); Gao, Ge; He, Shiying [Institute of Plasma Physics, Chinese Academy of Science (ASIPP), P.O. Box 1126, Hefei, Anhui Province 230031 (China)

    2016-11-15

    Highlights: • The hardware in the loop simulation of the EAST PF system is presented. • The control functions and the protection logic have been tested and verified. • The major faults could be avoided and commissioning time could be saved on site. - Abstract: The EAST poloidal field (PF) control system was upgraded in 2015 and the new system has been in use for the 2015 EAST campaign. This paper presents the implementation of a hardware-in-the-loop (HIL) simulation platform of the EAST PF converter system based on the RT-LAB simulation environment, which was used to improve and evaluate the performance of the real controller. The EAST PF power supply system and its operational modes are presented in this paper. The experiments on HIL simulation platform show that the control algorithms and the over current protection of the controller meet the design requirements well. In addition, the effectiveness of the designed control system has been verified by actual application during the EAST campaign at 2015 for six months.

  12. Hardware-in-the-loop simulation of the EAST PF converter for PF control system upgrade

    International Nuclear Information System (INIS)

    Chen, Xiaojiao; Fu, Peng; Huang, Liansheng; Gao, Ge; He, Shiying

    2016-01-01

    Highlights: • The hardware in the loop simulation of the EAST PF system is presented. • The control functions and the protection logic have been tested and verified. • The major faults could be avoided and commissioning time could be saved on site. - Abstract: The EAST poloidal field (PF) control system was upgraded in 2015 and the new system has been in use for the 2015 EAST campaign. This paper presents the implementation of a hardware-in-the-loop (HIL) simulation platform of the EAST PF converter system based on the RT-LAB simulation environment, which was used to improve and evaluate the performance of the real controller. The EAST PF power supply system and its operational modes are presented in this paper. The experiments on HIL simulation platform show that the control algorithms and the over current protection of the controller meet the design requirements well. In addition, the effectiveness of the designed control system has been verified by actual application during the EAST campaign at 2015 for six months.

  13. The Upgrade of the Control System for the CERN/NA62 Liquid Krypton Detector

    CERN Document Server

    Moraux, A; Bremer, J; Falaleev, V; Gonidec, A; Passardi, Giorgio; Pezzetti, M

    2009-01-01

    The NA62 experiment is a continuation of the CERN kaon research program and particularly of the NA48 experiment which was designed in the early 90’s to measure the direct CP violation with a very high precision. An important component of the experimental setup is an electromagnetic calorimeter filled with 9000 liters of high-purity liquid krypton at 120 K. Its associated cryogenic system aims at providing a very high reliability and stable thermal conditions with temperature stabilization better than 0.1 K. The upgrade of the cryogenic control system was motivated by the need of ensuring its durability and standardization for the long term fixed-target physics program at the CERN Super Proton Synchrotron (SPS). This paper describes the adopted technical solutions to minimize the control shutdown and emphasizes the related safety issues.

  14. The upgraded control and instrumentation system of C9 irradiation device

    International Nuclear Information System (INIS)

    Pulpa, A.; Parvu, C.; Valeca, S. C.; Ancuta, M.; Ana, E.

    2016-01-01

    C9 Capsule is an irradiation device of TRIGA SSR, which was designed for nuclear fuel cycling testing. It simulates the load follow-up by the power reactor, i.e. CANDU 700MW operating with variable load. The irradiation tests in the power cycling conditions were conceived for complete characterization of the fuel behaviour. The irradiation conditions are similar to those found in nuclear power plant when it is operated in load following mode. The power cycling tests are performed by using an under flux moving system. The paper presents the upgraded control and instrumentation system of the ''9C irradiation device, designed and manufactured in order to enhance the performance of this system for better surveillance and processing of the acquired experimental data. (authors)

  15. Software upgrade for the DIII-D neutral beam control systems

    International Nuclear Information System (INIS)

    Cummings, J.W.; Thurgood, P.A.

    1991-11-01

    The neutral beams are used to heat the plasma in the DIII-D tokamak, a fusion energy research experiment operated by General Atomics (GA) and funded by the Department of Energy (DOE). The experiment is dedicated to demonstrating noninductive current drive of high beta high temperature divertor plasma with good confinement. The neutral beam heating system for the DIII-D tokamak uses four MODCOMP Classic computers for data acquisition and control of the four beamlines. The Neutral Beam Software Upgrade project was launched in early 1990. The major goals were to upgrade the MAX IV operating system to the latest revision (K.1), use standard MODCOMP software (as much as possible), and to develop a very ''user friendly,'' versatile system. Accomplishing these goals required new software to be developed and modifications to existing applications software to make it compatible with the latest operating system. The custom operating system modules to handle the message service and interrupt handling were replaced by the standard MODCOMP Inter Task Communication (ITC) and interrupt routines that are part of the MAX IV operating system. The message service provides the mechanism for doing shot task sequencing (task scheduling). The interrupt routines are used to connect external interrupts to the system. The new software developed consists of a task dispatcher, screen manager, and interrupt tasks. The existing applications software had to be modified to be compatible with the MODCOMP ITC services and consists of the Modcomp Infinity Data Base Manager, a multi-user system, and menu-driven operating system interface routines using the Infinity Data Base Manager

  16. Upgraded RECOVER system - CASDAC system

    International Nuclear Information System (INIS)

    Yamamoto, Yoichi; Koyama, Kinji

    1992-03-01

    The CASDAC (Containment And Surveillance Data Authenticated Communication) system has been developed by JAERI for nuclear safeguards and physical protection of nuclear material. This system was designed and constructed as an upgraded RECOVER system, design concept of which was based on the original RECOVER system and also the TRANSEAVER system. Both of them were developed several years ago as a remote monitoring system for continual verification of security and safeguards status of nuclear material. The system consists of two subsystems, one of them is a Grand Command Center (GCC) subsystem and the other is a facility subsystem. Communication between the two subsystems is controlled through the international telephone line network. Therefore all communication data are encrypted to prevent access by an unauthorized person who may intend to make a falsification, or tapping. The facility subsystem has an appropriate measure that ensure data security and reliable operation under unattended mode of operator. The software of this system is designed so as to be easily used in other different types of computers. This report describes the outline of the CASDAC system and the results of its performance test. This work has been carried out in the framework of Japan Support Programme for Agency Safeguards (JASPAS) as a project, JA-1. (author)

  17. The Control and Configuration Software of the ATLAS Data Acquisition System: Upgrades for LHC Run 2

    CERN Document Server

    Aleksandrov, Igor; The ATLAS collaboration; Avolio, Giuseppe; Caprini, Mihai; Corso-Radu, Alina; D'ascanio, Matteo; De Castro Vargas Fernandes, Julio; Kazarov, Andrei; Kolobara, Bernard; Lankford, Andrew; Laurent, Florian; Lehmann Miotto, Giovanna; Magnoni, Luca; Papaevgeniou, Lykourgos; Ryabov, Yury; Santos, Alejandro; Seixas, Jose; Soloviev, Igor; Unel, Gokhan; Yasu, Yoshiji

    2016-01-01

    The Trigger and Data Acquisition (TDAQ) system of the ATLAS detector at the Large Hadron Collider (LHC) at CERN is composed of a large number of distributed hardware and software components which in a coordinated manner provide the data-taking functionality of the overall system. The Controls and Configuration (CC) software offers services to configure, control and monitor the TDAQ system. It is a framework which provides essentially the glue that holds the various sub-systems together. While the overall architecture, established at the end of the 90’s, has proven to be solid and flexible, many software components (from core services, like the Run Control and the error management system, to end- user tools) have undergone a complete redesign or re-implementation during the LHC’s Long Shutdown I period. The upgrades were driven by the need to fold-in the additional requirements that appeared in the course of LHC’s Run 1, to profit from new technologies and to re-factorize and cleanup the code. This paper...

  18. CANDU Digital Control Computer upgrade options

    International Nuclear Information System (INIS)

    De Jong, M.S.; De Grosbois, J.; Qian, T.

    1997-01-01

    This paper reviews the evolution of Digital Control Computers (DCC) in CANDU power plants to the present day. Much of this evolution has been to meeting changing control or display requirements as well as the replacement of obsolete, or old and less reliable technology with better equipment that is now available. The current work at AECL and Canadian utilities to investigate DCC upgrade options, alternatives, and strategies are examined. The dependence of a particular upgrade strategy on the overall plant refurbishment plans are also discussed. Presently, the upgrade options range from replacement of individual obsolete system components, to replacement of the entire DCC hardware without changing the software, to complete replacement of the DCCs with a functionally equivalent system using new control computer equipment and software. Key issues, constraints and objectives associated with these DCC upgrade options are highlighted. (author)

  19. FPGA-based Upgrade to RITS-6 Control System, Designed with EMP Considerations

    International Nuclear Information System (INIS)

    Anderson, Harold D.; Williams, John T.

    2009-01-01

    The existing control system for the RITS-6, a 20-MA 3-MV pulsed-power accelerator located at Sandia National Laboratories, was built as a system of analog switches because the operators needed to be close enough to the machine to hear pulsed-power breakdowns, yet the electromagnetic pulse (EMP) emitted would disable any processor-based solutions. The resulting system requires operators to activate and deactivate a series of 110-V relays manually in a complex order. The machine is sensitive to both the order of operation and the time taken between steps. A mistake in either case would cause a misfire and possible machine damage. Based on these constraints, a field-programmable gate array (FPGA) was chosen as the core of a proposed upgrade to the control system. An FPGA is a series of logic elements connected during programming. Based on their connections, the elements can mimic primitive logic elements, a process called synthesis. The circuit is static; all paths exist simultaneously and do not depend on a processor. This should make it less sensitive to EMP. By shielding it and using good electromagnetic interference-reduction practices, it should continue to operate well in the electrically noisy environment. The FPGA has two advantages over the existing system. In manual operation mode, the synthesized logic gates keep the operators in sequence. In addition, a clock signal and synthesized countdown circuit provides an automated sequence, with adjustable delays, for quickly executing the time-critical portions of charging and firing. The FPGA is modeled as a set of states, each state being a unique set of values for the output signals. The state is determined by the input signals, and in the automated segment by the value of the synthesized countdown timer, with the default mode placing the system in a safe configuration. Unlike a processor-based system, any system stimulus that results in an abort situation immediately executes a shutdown, with only a tens

  20. Management of complex data flows in the ASDEX Upgrade plasma control system

    Energy Technology Data Exchange (ETDEWEB)

    Treutterer, Wolfgang, E-mail: Wolfgang.Treutterer@ipp.mpg.de [Max-Planck Institut fuer Plasmaphysik, EURATOM Association, Garching (Germany); Neu, Gregor; Raupp, Gerhard; Zasche, Dieter; Zehetbauer, Thomas [Max-Planck Institut fuer Plasmaphysik, EURATOM Association, Garching (Germany); Cole, Richard; Lueddecke, Klaus [Unlimited Computer Systems, Iffeldorf (Germany)

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer Control system architectures with data-driven workflows are efficient, flexible and maintainable. Black-Right-Pointing-Pointer Signal groups provide coherence of interrelated signals and increase the efficiency of process synchronisation. Black-Right-Pointing-Pointer Sample tags indicating sample quality form the fundament of a local event handling strategy. Black-Right-Pointing-Pointer A self-organising workflow benefits from sample tags consisting of time stamp and stream activity. - Abstract: Establishing adequate technical and physical boundary conditions for a sustained nuclear fusion reaction is a challenging task. Phased feedback control and monitoring for heating, fuelling and magnetic shaping is mandatory, especially for fusion devices aiming at high performance plasmas. Technical and physical interrelations require close collaboration of many components in sequential as well as in parallel processing flows. Moreover, handling of asynchronous, off-normal events has become a key element of modern plasma performance optimisation and machine protection recipes. The manifoldness of plasma states and events, the variety of plant system operation states and the diversity in diagnostic data sampling rates can hardly be mastered with a rigid control scheme. Rather, an adaptive system topology in combination with sophisticated synchronisation and process scheduling mechanisms is suited for such an environment. Moreover, the system is subject to real-time control constraints: response times must be deterministic and adequately short. Therefore, the experimental tokamak device ASDEX Upgrade employs a discharge control system DCS, whose core has been designed to meet these requirements. In the paper we will compare the scheduling schemes for the parallelised realisation of a control workflow and show the advantage of a data-driven workflow over a managed workflow. The data-driven workflow as used in DCS is based on signals

  1. Management of complex data flows in the ASDEX Upgrade plasma control system

    International Nuclear Information System (INIS)

    Treutterer, Wolfgang; Neu, Gregor; Raupp, Gerhard; Zasche, Dieter; Zehetbauer, Thomas; Cole, Richard; Lüddecke, Klaus

    2012-01-01

    Highlights: ► Control system architectures with data-driven workflows are efficient, flexible and maintainable. ► Signal groups provide coherence of interrelated signals and increase the efficiency of process synchronisation. ► Sample tags indicating sample quality form the fundament of a local event handling strategy. ► A self-organising workflow benefits from sample tags consisting of time stamp and stream activity. - Abstract: Establishing adequate technical and physical boundary conditions for a sustained nuclear fusion reaction is a challenging task. Phased feedback control and monitoring for heating, fuelling and magnetic shaping is mandatory, especially for fusion devices aiming at high performance plasmas. Technical and physical interrelations require close collaboration of many components in sequential as well as in parallel processing flows. Moreover, handling of asynchronous, off-normal events has become a key element of modern plasma performance optimisation and machine protection recipes. The manifoldness of plasma states and events, the variety of plant system operation states and the diversity in diagnostic data sampling rates can hardly be mastered with a rigid control scheme. Rather, an adaptive system topology in combination with sophisticated synchronisation and process scheduling mechanisms is suited for such an environment. Moreover, the system is subject to real-time control constraints: response times must be deterministic and adequately short. Therefore, the experimental tokamak device ASDEX Upgrade employs a discharge control system DCS, whose core has been designed to meet these requirements. In the paper we will compare the scheduling schemes for the parallelised realisation of a control workflow and show the advantage of a data-driven workflow over a managed workflow. The data-driven workflow as used in DCS is based on signals connecting process outputs and inputs. These are implemented as real-time streams of data samples

  2. Upgraded phase control system for superconducting low-velocity accelerating structures

    Energy Technology Data Exchange (ETDEWEB)

    Added, N [Sao Paulo Univ., SP (Brazil); Clifft, B E; Shepard, K W [Argonne National Lab., IL (United States)

    1992-11-01

    Microphonic-induced fluctuations in the RF eigenfrequency of superconducting (SC) slow-wave structures must be compensated by a fast-tuning system in order to control the RF phase. The tuning system must handle a reactive power proportional to the product of the frequency range and the RF energy content of the RF cavity. The fast tuner for the SC resonators in the ATLAS heavy-ion linac is a voltage-controlled reactance based on an array of PIN diodes operating immersed in liquid nitrogen. This paper discusses recent upgrades to the ATLAS fast tuner which can now provide as much as 30 KVA of reactive tuning capability with a real RF power loss of less than 300 watts. The design was guided by numerical modeling of all elements of the device. Also discussed is the RF coupler which can couple 30 KW from 77 K tuner to a 4.2 K resonant cavity with less than 2 W of RF loss into 4.2 K. (Author) 6 refs., 2 figs.

  3. Upgraded phase control system for superconducting low-velocity accelerating structures

    International Nuclear Information System (INIS)

    Added, N.; Clifft, B.E.; Shepard, K.W.

    1992-01-01

    Microphonic-induced fluctuations in the RF eigenfrequency of superconducting (SC) slow-wave structures must be compensated by a fast-tuning system in order to control the RF phase. The tuning system must handle a reactive power proportional to the product of the frequency range and the RF energy content of the RF cavity. The fast tuner for the SC resonators in the ATLAS heavy-ion linac is a voltage-controlled reactance based on an array of PIN diodes operating immersed in liquid nitrogen. This paper discusses recent upgrades to the ATLAS fast tuner which can now provide as much as 30 KVA of reactive tuning capability with a real RF power loss of less than 300 watts. The design was guided by numerical modeling of all elements of the device. Also discussed is the RF coupler which can couple 30 KW from 77 K tuner to a 4.2 K resonant cavity with less than 2 W of RF loss into 4.2 K. (Author) 6 refs., 2 figs

  4. Upgraded phase control system for superconducting low-velocity accelerating structures

    International Nuclear Information System (INIS)

    Added, N.

    1992-01-01

    Microphonic-induced fluctuations in the RF eigenfrequency of superconducting (SC) slow-wave structures must be compensated by a fast-tuning system in order to control the RF phase. The tuning system must handle a reactive power proportional to the product of the frequency range and the RF energy content of the Rf cavity. The fast tuner for the SC resonators in the ATLAS heavy-ion linac is a voltage-controlled reactance based on an array of PIN diodes operating immersed in liquid nitrogen. This paper discusses recent upgrades to the ATLAS fast tuner which can now provide as much as 30 KVA of reactive tuning capability with a real RF power loss of less than 300 watts. The design was guided by numerical modeling of all elements of the device. Also discussed is the RF coupler which can couple 30 KW from 77 K tuner to a 42 K resonant cavity with less than 2 W of RF loss into 4.2 K

  5. Upgraded phase control system for superconducting low-velocity accelerating structures

    Energy Technology Data Exchange (ETDEWEB)

    Added, N. (Sao Paulo Univ., SP (Brazil). Dept. de Fisica Nuclear); Clifft, B.E.; Shepard, K.W. (Argonne National Lab., IL (United States))

    1992-01-01

    Microphonic-induced fluctuations in the RF eigenfrequency of superconducting (SC) slow-wave structures must be compensated by a fast-tuning system in order to control the RF phase. The tuning system must handle a reactive power proportional to the product of the frequency range and the RF energy content of the Rf cavity. The fast tuner for the SC resonators in the ATLAS heavy-ion linac is a voltage-controlled reactance based on an array of PIN diodes operating immersed in liquid nitrogen. This paper discusses recent upgrades to the ATLAS fast tuner which can now provide as much as 30 KVA of reactive tuning capability with a real RF power loss of less than 300 watts. The design was guided by numerical modeling of all elements of the device. Also discussed is the RF coupler which can couple 30 KW from 77 K tuner to a 42 K resonant cavity with less than 2 W of RF loss into 4.2 K.

  6. Upgraded phase control system for superconducting low-velocity accelerating structures

    Energy Technology Data Exchange (ETDEWEB)

    Added, N. [Sao Paulo Univ., SP (Brazil). Dept. de Fisica Nuclear; Clifft, B.E.; Shepard, K.W. [Argonne National Lab., IL (United States)

    1992-09-01

    Microphonic-induced fluctuations in the RF eigenfrequency of superconducting (SC) slow-wave structures must be compensated by a fast-tuning system in order to control the RF phase. The tuning system must handle a reactive power proportional to the product of the frequency range and the RF energy content of the Rf cavity. The fast tuner for the SC resonators in the ATLAS heavy-ion linac is a voltage-controlled reactance based on an array of PIN diodes operating immersed in liquid nitrogen. This paper discusses recent upgrades to the ATLAS fast tuner which can now provide as much as 30 KVA of reactive tuning capability with a real RF power loss of less than 300 watts. The design was guided by numerical modeling of all elements of the device. Also discussed is the RF coupler which can couple 30 KW from 77 K tuner to a 42 K resonant cavity with less than 2 W of RF loss into 4.2 K.

  7. Software upgrade for the DIII-D neutral beam control systems

    International Nuclear Information System (INIS)

    Cummings, J.W.; Thurgood, P.A.

    1992-01-01

    This paper reports on the Neutral Beam Software Upgrade project which was launched in early 1990. The major goals were to upgrade the MAC IV operating system to the latest revision (K.1), use standard MODCOMP software (as much as possible), and to develop a very user friendly, versatile system. Accomplishing these goals required new software to be developed and modifications to existing applications software to make it compatible with the latest operating system. The custom operating system modules to handle the message service and interrupt handling were replaced by the standard MODCOMP Inter Task Communication (ITC) and interrupt routines that are part of the MAX IV operating system. The message service provides the mechanism for doing shot task sequencing (task scheduling). The interrupt routines are used to connect external irterrupts to the system

  8. Upgrading the Reactor Power Control Concept with a Modern Digital Control System

    International Nuclear Information System (INIS)

    Laengle, M.; Schildheuer, R.

    2011-01-01

    Within the framework of a retrofit project, a reactor power instrumentation and control system (REALL) - consisting of a limiting system and the respective reactor control systems - was retrofitted and modernized in a 1450-MW-nuclear-power-plant in Baden-Wuerttemberg. The REALL process control functions were implemented within a modern and completely digitized control system that has been designed for use in safety I and C applications. Along with the installation of the digital control system, the associated hardware was adapted to today's state of the art. At the same time, the given potential for improvement, as revealed during the plant's operation so far, was taken into account in the programming. In order to provide for transparent and quality-assured project management, the implementation was based on a stage plan consisting of several steps, along with specific milestones. Final commissioning of the modern digital control system took place during the 2008 plant overhaul. Despite the complex commissioning procedure, it was possible to avoid a major prolongation of the plant's downtime and to keep within a rough 4-week timeframe that had originally been defined for the plant overhaul to adequate structuring of the project, goal-oriented implementation of preparatory infrastructural measures and adequate scheduling of the coordinated activities of the installation and commissioning teams entrusted with the commissioning of the digital control system during the overhaul activities. (author)

  9. System architecture of Detector Control and safety for the ATLAS Inner Detector Upgrade

    International Nuclear Information System (INIS)

    Ferrere, D.; Kersten, S.

    2011-01-01

    In the current ATLAS Upgrade plan a new Inner Detector (ID) based upon silicon sensor technology is being considered. The operational monitoring and control of the ID will be very demanding. The Detector Control System (DCS) is a common tool that is essential for the operational safety of a system. Even at this early stage the DCS system architecture has to be defined such that it is well integrated and optimized for its later implementation and use. For example the DCS diagnostics for the front-end (FE) chips is a serious option being considered that needs an early requirement and specification definition. In addition one of the main constraints is the service reuse between the service patch panels of the ATLAS ID and the counting room that limits the number of electrical lines to be reused. Conceptual differences in terms of readout architecture and layout have been identified between the strip and the pixel detector that lead to two distinct architectures. Nevertheless, the limitation of available electrical lines going to the counting room as well as the low material budget requirements inside the ID volume are two major constraints that lead the ID to consider an on-detector radiation hard integrated circuitry for the slow control. At this stage of the project, the definitions of the logical actions and protocol for the ADCs of such a chip are still being specified. In addition the experience gained from the current ID will be essential for the guidance of tuning the future DCS architecture in the coming years.

  10. Upgrade of GUI for linac control

    International Nuclear Information System (INIS)

    Oonuma, Tadahiro; Shibasaki, Yoshinobu

    1993-01-01

    We are now upgrading GUI(Graphical User Interface) of the control system at Tohoku Linac. This system uses Personal Computer (DECpc466D2LP-66MHz) and Visual Basic which makes coding GUI easy and simple. The first results of this system are presented. (author)

  11. FTU bolometer electronic system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Pollastrone, Fabio, E-mail: fabio.pollastrone@enea.it [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy); Neri, Carlo; Florean, Marco; Ciccone, Giovanni [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy)

    2013-10-15

    Highlights: ► Design and realization of a new bolometer electronic system. ► Many improvements over the actual commercial system. ► Architecture based on digital electronic hardware with minimal analog front end. ► Auto off-set correction, real time visualization features and small system size. ► Test results for the electronic system. -- Abstract: The FTU (Frascati Tokamak Upgrade) requires a bolometer diagnostic in order to measure the total plasma radiation. The current diagnostic architecture is based on a full analog multichannel AC bolometer system, which uses a carrier frequency amplifier with a synchronous demodulation. Taking into account the technological upgrades in the field of electronics, it was decided to realize an upgrade for the bolometric electronic system by using a hybrid analog/digital implementation. The new system developed at the ENEA Frascati laboratories has many improvements, and mainly a massive system volume reduction, a good measurement linearity and a simplified use. The new hardware system consists of two subsystems: the Bolometer Digital Control and the Bolometer Analog System. The Bolometer Digital Control can control 16 bolometer bridges through the Bolometer Analog System. The Bolometer Digital Control, based on the FPGA architecture, is connected via Ethernet with a PC; therefore, it can receive commands settings from the PC and send the stream of bolometric measurements in real time to the PC. In order to solve the cross-talk between the bridges and the cables, each of the four bridges in the bolometer head receives a different synthesized excitation frequency. Since the system is fully controlled by a PC GUI (Graphic User Interface), it is very user friendly. Moreover, some useful features have been developed, such as: auto off-set correction, bridge amplitude regulation, software gain setting, real time visualization, frequency excitation selection and noise spectrum analyzer embedded function. In this paper, the

  12. Human-machine interface (HMI) report for 241-SY-101 data acquisition [and control] system (DACS) upgrade study

    Energy Technology Data Exchange (ETDEWEB)

    Truitt, R.W.

    1997-10-22

    This report provides an independent evaluation of information for a Windows based Human Machine Interface (HMI) to replace the existing DOS based Iconics HMI currently used in the Data Acquisition and Control System (DACS) used at Tank 241-SY-101. A fundamental reason for this evaluation is because of the difficulty of maintaining the system with obsolete, unsupported software. The DACS uses a software operator interface (Genesis for DOS HMI) that is no longer supported by its manufacturer, Iconics. In addition to its obsolescence, it is complex and difficult to train additional personnel on. The FY 1997 budget allocated $40K for phase 1 of a software/hardware upgrade that would have allowed the old DOS based system to be replaced by a current Windows based system. Unfortunately, budget constraints during FY 1997 has prompted deferral of the upgrade. The upgrade needs to be performed at the earliest possible time, before other failures render the system useless. Once completed, the upgrade could alleviate other concerns: spare pump software may be able to be incorporated into the same software as the existing pump, thereby eliminating the parallel path dilemma; and the newer, less complex software should expedite training of future personnel, and in the process, require that less technical time be required to maintain the system.

  13. ECRH on ASDEX Upgrade - System Status, Feed-Back Control, Plasma Physics Results -

    Directory of Open Access Journals (Sweden)

    Flamm J.

    2012-09-01

    Full Text Available The ASDEX Upgrade (AUG ECRH system now delivers a total of 3.9 MW to the plasma at 140 GHz. Three new units are capable of 2-frequency operation and may heat the plasma alternatively with 2.1 MW at 105 GHz. The system is routinely used with X2, O2, and X3 schemes. For Bt = 3.2 T also an ITER-like O1-scheme can be run using 105 GHz. The new launchers are capable of fast poloidal movements necessary for real-time control of the location of power deposition. Here real-time control of NTMs is summarized, which requires a fast analysis of massive data streams (ECE and Mirnov correlation and extensive calculations (equilibria, ray-tracing. These were implemented at AUG using a modular concept of standardized real-time diagnostics. The new realtime capabilities have also been used during O2 heating to keep the first reflection of the non-absorbed beam fraction on the holographic reflector tile which ensures a well defined second pass of the beam through the central plasma. Sensors for the beam position are fast thermocouples at the edge of the reflector tile. The enhanced ECRH power was used for several physics studies related to the unique feature of pure electron heating without fueling and without momentum input. As an example the effect of the variation of the heating mix in moderately heated H-modes is demonstrated using the three available heating systems, i.e. ECRH, ICRH and NBI. Keeping the total input power constant, strong effects are seen on the rotation, but none on the pedestal parameters. Also global quantities as the stored energy are hardly modified. Still it is found that the central ion temperature drops as the ECRH fraction exceeds a certain threshold.

  14. The SimPort-based simulators and distributed control systems development, upgrade and testing

    International Nuclear Information System (INIS)

    Danilov, Victor A.; Yanushevich, Dmitry I.; Zenkov, Andrey D.

    2004-01-01

    This paper describes the SimPort computer technology application experience related with power plant simulators and Distributed Control System (DCS) emulators development. The paper presents basic characteristics of the SimPort as a Windows NT-based implementation variety of the developed in RRC 'Kurchatov Institute' math modeling and simulator creation AIS technology. The new approaches and benefits of using simulation for DCS development and, especially upgrade, testing and on plant tuning are presented in the paper briefly. The DCS-inclusive power plant SimPort-based simulators are also considered. The DCS emulation principal problems, solutions and the experience-based DCS emulators development methodology are presented also. The presented technology quality and efficiency as well as presented DCS emulation problem solutions were verified by the smallest power plant full scope computer simulators development man-hours (at least twice lower in comparison with the similar simulators) in combination with the simulators correspondence to the standard and the best quality of nuclear power plant simulators. (Author)

  15. Recent Upgrades and Extensions of the ASDEX Upgrade ECRH System

    Science.gov (United States)

    Wagner, Dietmar; Stober, Jörg; Leuterer, Fritz; Monaco, Francesco; Münich, Max; Schmid-Lorch, Dominik; Schütz, Harald; Zohm, Hartmut; Thumm, Manfred; Scherer, Theo; Meier, Andreas; Gantenbein, Gerd; Flamm, Jens; Kasparek, Walter; Höhnle, Hendrik; Lechte, Carsten; Litvak, Alexander G.; Denisov, Gregory G.; Chirkov, Alexey; Popov, Leonid G.; Nichiporenko, Vadim O.; Myasnikov, Vadim E.; Tai, Evgeny M.; Solyanova, Elena A.; Malygin, Sergey A.

    2011-03-01

    The multi-frequency Electron Cyclotron Heating (ECRH) system at the ASDEX Upgrade tokamak employs depressed collector gyrotrons, step-tunable in the range 105-140 GHz. The system is equipped with a fast steerable launcher allowing for remote steering of the ECRH RF beam during the plasma discharge. The gyrotrons and the mirrors are fully integrated in the discharge control system. The polarization can be controlled in a feed-forward mode. 3 Sniffer probes for millimeter wave stray radiation detection have been installed.

  16. Initial performance of upgraded Tevatron cryogenic systems

    International Nuclear Information System (INIS)

    Norris, B.L.

    1996-09-01

    Fermilab began operating a re-designed satellite refrigerator systems in November 1993. Upgrades were installed to operate the Tevatron at a magnet temperature of 3.5 K, approximately 1K lower than the original design. Refrigerator upgrades included new valve boxes, larger reciprocating expanders, the installation of cold vapor compressors, new sub-atmospheric instrumentation and an entirely new distributed controls system. Cryogenic system reliability data for Colliding Physics Run 1B is presented emphasizing a failure analysis for each aspect of the upgrade. Comparison to data for Colliding Physics Run 1A (previous to upgrade) is presented to show the impact of a major system overhaul. New operational problems and their solutions are presented in detail

  17. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  18. NSLS Control Monitor and its upgrade

    International Nuclear Information System (INIS)

    Ramamoorthy, S.; Smith, J.D.

    1993-01-01

    The NSLS Control Monitor is a real-time operating system designed for the microprocessor subsystems that control the machine hardware in the NSLS facility. Its major functions are to control the hardware in response to the commands from the host computers, monitor hardware status and report errors to the alarm handler. The software originally developed for the Multibus micros has been upgraded to run on the VME-based systems. The upgraded monitor provides ethernet communication with the new system and serial link with the old system. The dual link is the key feature for a smooth and nondisruptive transition at all levels of the control system. This paper describes the functions of the various modules of the monitor and future plans

  19. Upgrade of general control system employed for Materials and Life Science Experimental Facility of J-PARC

    International Nuclear Information System (INIS)

    Watanabe, Akihiko; Sakai, Kenji; Ooi, Motoki; Meigo, Shin-ichiro; Takada, Hiroshi

    2013-11-01

    The General Control System (GCS) of the Materials and Life Science Experimental Facility (MLF) of J-PARC controls various devices of a pulsed spallation neutron source and a muon target which are driven by proton beams with energy of 3 GeV and a power of 1 MW, neutron instruments of 23 neutron beam lines and muon instruments of 4 secondary muon beam lines under a network of the control system of accelerators. The current GCS has performed its function as designed since operating MLF was started in 2008. However, it has a weakness that it costs very much in the maintenance because of its poor flexibility on Operating System (OS) and software versions. For example, all computers composed of the GCS must be replaced when the OS is upgraded. For improving the potential flexibility of the GCS in maintenance in view of sustainable long-term operation, therefore, we have re-examined the framework software and those employed for individual functions of GCS under the condition of current functions so as to control all local control panels by plural exclusive PCs, and acquire, store and distribute operation data over 7000 items in the suitable data format. Furthermore, we have made a prototype of an upgraded GCS and evaluated its concrete performances with true data/information such as data transmission speed from PLCs, control functions from operating windows, storage capability of data server and long-term stability/reliability of the system. In conclusion, we decided to adopt following softwares for the upgraded GCS: Experimental Physics and Industrial Control System (EPICS) as framework software, Takebishi-made OPC server as data input/output module, Control System Studio (CSS) as user interface window and PostgreSQL as the data storage server. (author)

  20. Upgrading the Control Systems of Turbines of K-160-12.8 Type Produced by PAO Turboatom

    Science.gov (United States)

    Babayev, I. N.

    2018-05-01

    Steam turbines of a K-160-12.8 (PVK-150) type produced by PAO Turboatom are operated at thermal power plants from the 1960s and many of them still have the complete set that was installed at that time by the factory, but they have become out of date. For this reason, the problem of upgrading the turbines to bring their characteristics into compliance with modern requirements is relevant. This article describes the main technical decisions adopted by PAO Turboatom when upgrading the automatic control system (ACS) of a K-160-12.8 (PVK-150) turbine: replacing the control valves (CV); replacing the distributing mechanism; replacing the front support components, including the main servomotor and oil control pipes; and replacing the assembly of cutoff spools by separate spools of servomotors of high-pressure control valves and reheat control valves. The schematic diagram of the ACS and description of the structure of newly installed mechanisms are presented: the cutoff spools, the high-pressure CVs, the distribution mechanism, and the main servomotor. The particularity of the ACS is the presence of electromechanical converters, which are used in each cutoff spool. For improving operating reliability of the ACS by providing the actuation of servomotors of control valves for closing regardless of ACS commands, the connection of rods of the electromechanical converter and cutoff spools are made using spring-type uncoupling devices. For actuation of the protection system by the commands of the automatic electronic safety device, the separate actuator driven by an electromagnet is installed in the ACS. During further improvement of the protection system, it is recommended to replace the controller assembly by two-spool protection devices, remove the protection spool assembly, and increase the pressure in the protection lines up to power pressure. The upgrading during this project was carried out by the Dobrotvor TPP (Ukraine).

  1. The Ural Electrochemical Integrated Plant Sustainability Program of Nuclear Material Protection, Control and Accounting System Upgrades

    International Nuclear Information System (INIS)

    Vakhonin, Alexander; Yuldashev, Rashid; Dabbs, Richard D.; Carroll, Michael F.; Garrett, Albert G.; Patrick, Scott W.; Ku, Eshter M.

    2009-01-01

    UEIP has been working on a comprehensive sustainability program that includes establishing a site sustainability working group, information gathering, planning, organizing, developing schedule and estimated costs, trhough joint UEIP-US DOE/NNSA National Laboratory sustainability contracts. Considerable efforts have been necessary in the sustainability planning, monitoring, and control of the scope of work using tools such as Microsoft Excel, Microsoft Project and SAP R/3. While information interchanges within the sustainability program provides adequate US assurances that US funds are well spent through its quarterly reporting methodology, proper information security and protection measures are taken throughout the process. Decommissioning of outdated equipment has also become part of determining sustainability requirements and processes. The site's sustainability program has facilitated the development of a transition plan toward eventual full Russian funding of sustaining nuclear security upgrades.

  2. System and process for upgrading hydrocarbons

    Science.gov (United States)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  3. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  4. Specification of requirements for upgrades using digital instrument and control systems. Report prepared within the framework of the international working group on nuclear power plant control and instrumentation

    International Nuclear Information System (INIS)

    1999-01-01

    The need to develop good specifications of requirements for instrument and control (I and C) systems applies throughout the world and is becoming more and more important as more upgrades are planned. Better guidance on how to develop good requirements specifications would support safer, more effective and more economical refits and upgrades. The need for this was pointed out by the IAEA International Working Group on Nuclear Power Plant Control and Instrumentation (IWG-NPPCI). This report is the result of a series of advisory and consultants meetings held by the IAEA in 1997 and 1998 in Vienna. The scope of the activities described covers a methodology for the determination of requirements and the development of the necessary specifications and plans needed through the life-cycle of digital instrumentation and control systems. It is restricted to technical aspects and indicates subjects which should be included in specifications and plans at different phases

  5. The Ural Electrochemical Integrated Plant Process for Managing Equipment Intended for Nuclear Material Protection, Control and Accounting System Upgrades

    International Nuclear Information System (INIS)

    Yuldashev, Rashid; Nosov, Andrei; Carroll, Michael F.; Garrett, Albert G.; Dabbs, Richard D.; Ku, Esther M.

    2008-01-01

    Since 1996, the Ural Electrochemical Integrated Plant (UEIP) located in the town of Novouralsk, Russia, (previously known as Sverdlovsk-44) and the United States Department of Energy (U.S. DOE) have been cooperating under the Nuclear Material Protection, Control and Accounting (MPC and A) Program. Because UEIP is involved in the processing of highly enriched uranium (HEU) into low enriched uranium (LEU), and there are highly enriched nuclear materials on its territory, the main goal of the MPC and A cooperation is to upgrade those systems that ensure secure storage, processing and transportation of nuclear materials at the plant. UEIP has completed key upgrades (equipment procurement and installation) aimed at improving MPC and A systems through significant investments made by both the U.S. DOE and UEIP. These joint cooperative efforts resulted in bringing MPC and A systems into compliance with current regulations, which led to nuclear material (NM) theft risk reduction and prevention from other unlawful actions with respect to them. Upon the U.S. MPC and A project team's suggestion, UEIP has developed an equipment inventory control process to track all the property provided through the MPC and A Program. The UEIP process and system for managing equipment provides many benefits including: greater ease and efficiency in determining the quantities, location, maintenance and repair schedule for equipment; greater assurance that MPC and A equipment is in continued satisfactory operation; and improved control in the development of a site sustainability program. While emphasizing UEIP's equipment inventory control processes, this paper will present process requirements and a methodology that may have practical and helpful applications at other sites.

  6. Advanced transport operating system software upgrade: Flight management/flight controls software description

    Science.gov (United States)

    Clinedinst, Winston C.; Debure, Kelly R.; Dickson, Richard W.; Heaphy, William J.; Parks, Mark A.; Slominski, Christopher J.; Wolverton, David A.

    1988-01-01

    The Flight Management/Flight Controls (FM/FC) software for the Norden 2 (PDP-11/70M) computer installed on the NASA 737 aircraft is described. The software computes the navigation position estimates, guidance commands, those commands to be issued to the control surfaces to direct the aircraft in flight based on the modes selected on the Advanced Guidance Control System (AGSC) mode panel, and the flight path selected via the Navigation Control/Display Unit (NCDU).

  7. Upgrading of seismic capacity of WWER equipment including reactor control rods and distribution systems

    International Nuclear Information System (INIS)

    Kostarev, V.

    1993-01-01

    This paper concerns the experience of CKTI VIBROSEISM firm (CVS) in seismic capacity upgrading of the WWER equipment and pipings. During the last 15 years CVS has accumulated a lot of experimental and analysis results on many of WWER units 'in former Soviet Union. That might be very useful in seismic protecting of East European Nuclear Power Plants. (author)

  8. Old Wine in New Bottles-The SPEAR Control System Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Rarback, Harvey

    1999-10-19

    The control systems for the SPEAR storage ring and injector were designed almost two decades ago and have worked reliably for us. Both systems are heavily dependent on the OpenVMS operating system and CAMAC. The realtime data reside in shared memory on a single computer for each control system. In order to use more modern client tools while preserving our investment in the hardware and software, we have installed an EPICS Portable Channel Access Server (CAS) on the control computers. The CAS will serve the existing realtime data as EPICS Process Variables (PVs) and allow us to use client tools like dm2k and IDL running on other workstations to more easily build new operator interfaces and develop accelerator physics programs. The CAS will also provide the infrastructure to help integrate new hardware controlled by EPICS Input/Output Controllers (IOCs).

  9. Reactor control system upgrade for the McClellan Nuclear Radiation Center Sacramento, CA

    International Nuclear Information System (INIS)

    Power, M. A.

    1999-01-01

    Argonne National Laboratory is currently developing a new reactor control system for the McClellan Nuclear Radiation Facility. This new control system not only provides the same functionality as the existing control system in terms of graphic displays of reactor process variables, data archival capability, and manual, automatic, pulse and square-wave modes of operation, but adds to the functionality of the previous control system by incorporating signal processing algorithms for the validation of sensors and automatic calibration and verification of control rod worth curves. With the inclusion of these automated features, the intent of this control system is not to replace the operator but to make the process of controlling the reactor easier and safer for the operator. For instance, an automatic control rod calibration method reduces the amount of time to calibrate control rods from days to minutes, increasing overall reactor utilization. The control rod calibration curve, determined using the automatic calibration system, can be validated anytime after the calibration, as long as the reactor power is between 50W and 500W. This is done by banking all of the rods simultaneously and comparing the tabulated rod worth curves with a reactivity computer estimate. As long as the deviation between the tabulated values and the reactivity estimate is within a prescribed error band, then the system is in calibration. In order to minimize the amount of information displayed, only the essential flux-related data are displayed in graphical format on the control screen. Information from the sensor validation methods is communicated to the operators via messages, which appear in a message window. The messages inform the operators that the actual process variables do not correlate within the allowed uncertainty in the reactor system. These warnings, however, cannot cause the reactor to shutdown automatically. The reactor operator has the ultimate responsibility of using this

  10. Human factors aspects of the major upgrade to control systems at the Los Alamos National Laboratory Plutonium Facility

    International Nuclear Information System (INIS)

    Higgins, J.; Pope, N.

    1997-01-01

    The Plutonium Facility (TA-55) at Los Alamos National Laboratory (LANL) has been in operation for over 15 years. It handles projects such as: stockpile maintenance, surveillance, and dismantlement; pit rebuild; plutonium power source fabrication for long duration spacecraft missions (e.g., Cassini); nuclear materials technology research; nuclear materials storage; and remediation of nuclear waste. The Operations Center of TA-55 is the nerve center of the facility where operators are on duty around the clock and monitor several thousand data points using the Facility Control System (FCS). The FCS monitors, displays, alarms, and provides some limited control of the following systems; HVAC, fire detection and suppression, radiation detection, electrical, and other miscellaneous systems. The FCS was originally based on late 1970s digital technology, which is not longer supported by the vendors. Additionally, the equipment failure rates increased notably in the 1990s. Thus, plans were put into place to upgrade and replace the FCS hardware, software, and display components with modernized equipment. The process was complicated by the facts that: the facility was operational and could not be totally closed for the modifications; complete documentation was not available for the existing system; the Safety Analyses for the facility were in the process of being upgraded at the same time; and of course limited time and budgets. This paper will discuss the human factors aspects of the design, installation, and testing of the new FCS within the above noted constraints. Particular items to be discussed include the functional requirements definition, operating experience review, screen designs, test program, operator training, and phased activation of the new circuits in an operational facility

  11. DCS upgrades for nuclear power plants: Saving money and reducing risk through virtual-stimulation control system checkout

    International Nuclear Information System (INIS)

    McKim, G.; Yeager, M.; Weirich, C.

    2006-01-01

    Nuclear power plant control systems of 1970's vintage have reached the end of their life: reliability is poor and spare parts are hard to come by. At First Energy Perry station, two costly feedwater system trips caused by an ailing analog control system led to the decision to replace it with a modern Foxboro I/A-series Distributed Control System. The simulator was also upgraded using the Virtual-Stim simulation of I/A, called FSIM. Virtual-Stim simulation allows the configuration and graphics from the plant to be downloaded onto the simulator as-is, using the same tools and operator interface as the plant, without imprecise translations, conversions, or other emulation. Advances in simulation technology and market forces have led to an open architecture design, allowing FSIM to be 'bridged' to Perry's existing Opensim simulator process model. This appears to be an industry-wide trend as more control system vendors offer Virtual Stimulation solutions for connection to third-party simulation products. Taking a cue from First Energy's Sammis Station FSIM simulator projects, the Perry simulator was used for dedicated control verification and tuning. Preventing forced outages caused by control configuration errors can result in enormous savings, and the simulator is now required to precede any plant modifications rather than just a training tool that lags the plant. This testing revealed several surprising results for a relatively straightforward control strategy, showing that simulator-based testing will be even more crucial in the future as the remain-der of the balance of plant is migrated to digital control. (author)

  12. EBR-II argon cooling system restricted fuel handling I and C upgrade

    International Nuclear Information System (INIS)

    Start, S.E.; Carlson, R.B.; Gehrman, R.L.

    1995-01-01

    The instrumentation and control of the Argon Cooling System (ACS) restricted fuel handling control system at Experimental Breeder Reactor II (EBR-II) is being upgraded from a system comprised of many discrete components and controllers to a computerized system with a graphical user interface (GUI). This paper describes the aspects of the upgrade including reasons for the upgrade, the old control system, upgrade goals, design decisions, philosophies and rationale, and the new control system hardware and software

  13. Integrated Instrumentation and Control Upgrade Plan

    International Nuclear Information System (INIS)

    Wilkinson, D.; Sun, B.; Wray, L.; Smith, J.

    1992-02-01

    This document presents the first industry-wide integrated research and development plan to support upgrading instrumentation and control (I ampersand C) systems in nuclear power plants in the United States. The plan encompasses both solving obsolescence problems and introducing modern I ampersand C technology into the industry. Accomplishing this plan will provide the technological base to modernize existing plants, as well as bridge the gap to meet Advanced Light Water Reactor (ALWR) requirements for modern I ampersand C systems. This plan defines Research and Development tasks to meet the identified needs for the following technical elements: Instrumentation, Control and Protection, Man-Machine Support Systems, Maintenance, Communications, Verification and Validation, and Specifications and Standards

  14. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  15. Instrumentation and control system upgrade plan for operating PWR plants in Japan

    International Nuclear Information System (INIS)

    Ishii, Hirofumi

    1993-01-01

    Digital technology has been applied to all non-safety grade instrumentation and control (I ampersand C) systems in the latest Japanese PWR plants, and has achieved more reliable and operable systems, easier maintenance and cable reductions. In the next stage APWR plants, the digital technology will be also applied to all the I ampersand C systems including safety grade systems. Parallel to the above efforts, many backfitting programs in which the digital technology is applied to operating plants are under way to improve reliability and operability. The backfitting programs for operating plants are proceeded in two phases, synthesizing various utility's needs to improve plant availability and operability, improvement of digital technology, and complexity of the practicable replacement procedures. Phase 1 is a partial application of digital technology, while Phase 2 is a complete application of digital technology. Phase 1 has been implemented in a number of operation plants, while Phase 2 studies are in the design stage, but have not been implemented at this point. This paper presents examples of the partial application of digital technology to operating plants, and the contents of basic design for the complete application of digital technology

  16. Upgrade of Control and Protection System of the Ignalina Nuclear Power Plant Units 1 and 2

    International Nuclear Information System (INIS)

    Wright, Ronald E.; Fletcher, Norman; Sidnev, Victor E.; Bickel, John H.; Vianello, Aldo; Pearsall, Raymond D.

    2003-01-01

    The Ignalina nuclear power plant (NPP) Units 1 and 2 are Soviet-designed, RBMK (Reaktor Bolshoi Moschnosti Kipyashchiy), channelized, large power-type reactors. The original-design electrical capacity for each unit was 1500 MW. Unit 1 began operating in 1983, and Unit 2 was started up in 1987. In 1994, the government of Lithuania agreed to accept grant support for the Ignalina NPP Safety Improvement Program with funding supplied by the Nuclear Safety Account of the European Bank for Reconstruction and Development (EBRD). As conditions for receiving this funding, the Ignalina NPP agreed to prepare a comprehensive safety analysis report that would undergo independent peer review after it was issued. The EBRD Safety Panel oversaw preparation and review of the report. In 1996, the safety analysis report for Unit 1 was completed and delivered to the EBRD. Part of the analyses covered anticipated transients without scram (ATWS). The analysis showed that some ATWS scenarios could lead to unacceptable consequences in <1 min. The EBRD Safety Panel recommended to the government of Lithuania that the Ignalina NPP develop and implement a program of compensatory measures for the control and protection system before the unit would be allowed to return to operation following its 1998 maintenance outage. A compensatory control and protection system that would mitigate the unacceptable consequences was designed, procured, manufactured, tested, and installed. The project was funded by U.S. Department of Energy

  17. Upgrade of the controls for the Brookhaven linac

    International Nuclear Information System (INIS)

    Buxton, W.E.

    1995-01-01

    The control of the magnets, rf system, and other components at the Brookhaven Linac uses a system that was developed at Brookhaven in the late 1960's. This system will be retired in the summer of 1995. The Linac controls are being upgraded using modem VME-based hardware compatible with RHIC generation controls, and an existing serial field bus. The timing for the Linac will also be upgraded and will use components developed for RHIC. The controls in general, the timing for the Linac, and the modules developed will be described

  18. Safety evaluation for instrumentation and control system upgrading project of Malaysian TRIGA MARK II PUSPATI Research reactor

    International Nuclear Information System (INIS)

    Ridha Roslan; Nik Mohd Faiz Khairuddin

    2013-01-01

    Full-text: Malaysian TRIGA MARK II research reactor has been in safe operation since its first criticality in 1982. The reactor is licensed to be operated by Malaysian Nuclear Agency to perform training and research development related activities. Due to its extensive operation since last three decades, the option of modifications for safety and safety-related item and component become a necessary to replace the outdated equipment to a stat-of-art, reliable technologies. This paper will present the current regulatory activities performed by Atomic Energy Licensing Board (AELB) to ensure the upgrading of analogue to digital instrumentation and control system is implemented in safe manner. The review activity includes documentation review, manufacturer quality audit and on-site inspection for commissioning. The review performed by AELB is based on The International Atomic Energy Agency (IAEA) Safety Requirements NS-R-4, entitled Safety of Research Reactors. During this endeavour, AELB seeks technical cooperation from Korea Institute of Nuclear Safety (KINS), the nuclear experts organization of the country of origin of the instrumentation and control technology. The regulatory activity is still on-going and is expected to be completed by issuance of Authorization for Restart on December 2013. (author)

  19. An IMPI-compliant control system for the ATLAS TileCal Phase II Upgrade PreProcessor module

    CERN Document Server

    Zuccarello, Pedro Diego; The ATLAS collaboration

    2016-01-01

    TileCal is the Tile hadronic calorimeter of the ATLAS experiment at the LHC. The LHC upgrade program, currently under development, will culminate in the High Luminosity LHC (HL-LHC), which is expected to increase about five times the LHC nominal instantaneous luminosity. The readout electronics of the Tile calorimenter being redesigned introducing a new read-out strategy in order to accommodate the detector to the new HL-LHC parameters. The data generated inside the detector at every bunch crossing will be transmitted to the PreProcessor (PPR) boards before any event selection is applied. The PPRs will be located at off-detector sites. The PPR will be responsible of providing preprocessed trigger information to the ATLAS first level of trigger (L1). In overall it will represent the interface between the data acquisition, trigger and control systems and the on-detector electronics. The PPR, being an important part of the readout system, needs to be remotely accessed and monitored to prevent failures or, in cas...

  20. Instrumentation and control doctrine for VVER upgrading

    International Nuclear Information System (INIS)

    Pernette, R.; Cucciniello, J.; Trebot, R.

    1997-01-01

    The main results are reported of analyses carried out on the WWER-400 and WWER-1000 series, and the reasons are summed up underlying the decision to establish a policy of WWER instrumentation and control upgrading. It is shown that such a policy forms a key stage in any upgrading project and contributes to the improvement of reactor safety at several levels: it helps to optimize the integration of safety requirements; it makes it easier to achieve a high level of automation and a better man-machine interaction; it should raise the culture of reactor safety. Four annexes demonstrate the factual fundamentals and structure of such a policy. (A.K.)

  1. Take control of upgrading to Snow Leopard

    CERN Document Server

    Kissell, Joe

    2009-01-01

    Installing a major new version of Mac OS X should be exciting and fun, but without proper guidance you may find it nerve-wracking or even risk losing valuable files. Fortunately, many thousands of people have upgraded Mac OS X calmly and successfully with Joe Kissell's previous best-selling Take Control of Upgrading... titles. Joe's friendly, expert steps-developed over innumerable test installations-help you to avoid trouble, understand what's going on when you install Snow Leopard, and easily recover from problem

  2. Colorado River Sewer System Joint Venture to Upgrade Wastewater System

    Science.gov (United States)

    SAN FRANCISCO -Today, the Colorado River Sewer System Joint Venture, located in Parker, Ariz. entered into an agreement with the EPA to upgrade their wastewater treatment system to meet stringent water quality standards. The cost of the upgrade is ap

  3. Process control upgrades yield huge operational improvements

    International Nuclear Information System (INIS)

    Fitzgerald, W.V.

    2001-01-01

    Most nuclear plants in North America were designed and built in the late 60 and 70. The regulatory nature of this industry over the years has made design changes at the plant level difficult, if not impossible, to implement. As a result, many plants in this world region have been getting by on technology that is over 40 years behind the times. What this translates into is that the plants have not been able to take advantage of the huge technology gains that have been made in process control during this period. As a result, most of these plants are much less efficient and productive than they could be. One particular area of the plant that is receiving a lot of attention is the feedwater heaters. These systems were put in place to improve efficiency, but most are not operating correctly. This paper will present a case study where one progressive mid-western utility decided that enough was enough and implemented a process control audit of their heater systems. The audit clearly pointed out the existing problems with the current process control system. It resulted in a proposal for the implementation of a state of the art, digital distributed process control system for the heaters along with a complete upgrade of the level controls and field devices that will stabilize heater levels, resulting in significant efficiency gains and lower maintenance bills. Overall the payback period for this investment should be less than 6 months and the plant is now looking for more opportunities that can provide even bigger gains. (author)

  4. UPGRADES

    CERN Document Server

    D. Contardo and J. Spalding

    2013-01-01

    There is very good progress in the execution of the LS1 projects and in launching construction of the Phase 1 upgrades. We focus here on two main achievements since the last CMS Week. The approval of the third Phase 1 TDR The preparation of the L1 Trigger Upgrade Technical Design Report has been a major effort of the collaboration at the beginning of this year, especially to develop supporting Trigger menu and physics performance studies. These studies have demonstrated the efficiency of the upgraded system to ensure low lepton and jet trigger thresholds, leading to a significant increase of the acceptance for the Higgs measurements, in the associated production mode and in the ττ decays, as well as for the stop searches involving multiple jets in the final state. The TDR was submitted to the LHCC in May and approved at the June committee meeting. It is now a public document, completing the series of the three TDRs describing the Phase 1 upgrades, with the new Pixel system and the HCAL rea...

  5. Damping System for Torsional Resonances in Generator Shafts Using a Feedback Controlled Buffer Storage of Magnetic Energy at ASDEX Upgrade

    International Nuclear Information System (INIS)

    Kaesemann, C.-P.; Huart, M.; Mueller, P.; Sigalov, A.

    2006-01-01

    The electrical power and energy for ASDEX Upgrade (AUG) is provided by three separate pulsed networks based on flywheel generators. Major damages at couplings of the shaft of the synchronous generator EZ4 (220 MVA / 600 MWs) were discovered during a routine check. The damage can only be explained by torsional resonances in the generator shaft which are excited by active power transients from the converter loads. For generator protection, torque sensors were installed near the coupling between the flywheel and the rotor. They cause an early termination of plasma experiments if a predefined torque level is exceeded. These terminations limited the achievable plasma current flattop time of AUG significantly. Since a low natural damping of the torsional resonances was identified as a major cause of the phenomena observed, novel feedback controlled DC circuits were developed providing electromagnetic damping for the generator shafts in case of excitation. Each damping circuit consists of a DC choke, acting as a buffer storage of magnetic energy, fed by a thyristor converter. The current reference for the converter is derived from the torque sensor signals. This enables the choke current to alternate with the measured natural frequency of the shaft assembly. Thus, with proper phasing, torsional resonances in generator shaft systems weighing more than 100 tons can be damped with little additional power. Since April 2003, the damping circuits have been routinely operated during all plasma experiments. Despite the low damping power used, torsional resonances could be reduced to a value that avoids a trip signal from the torque sensors. This paper describes the results from analysing, designing and testing of the feedback controlled buffer storage of magnetic energy, representing an effective and low cost solution for damping torsional resonances in electric power systems. It will present the layout, analyse the results of measurements obtained during commissioning and

  6. The DIII-D cryogenic system upgrade

    International Nuclear Information System (INIS)

    Schaubel, K.M.; Laughon, G.J.; Campbell, G.L.; Langhorn, A.R.; Stevens, N.C.; Tupper, M.L.

    1993-10-01

    The original DIII-D cryogenic system was commissioned in 1981 and was used to cool the cryopanel arrays for three hydrogen neutral beam injectors. Since then, new demands for liquid helium have arisen including: a fourth neutral beam injector, ten superconducting magnets for the electron cyclotron heating gyrotrons, and more recently, the advanced diverter cryopump which resides inside the tokamak vacuum vessel. The original cryosystem could not meet these demands. Consequently, the cryosystem was upgraded in several phases to increase capacity, improve reliability, and reduce maintenance. The majority of the original system has been replaced with superior equipment. The capacity now exists to support present as well as future demands for liquid helium at DIII-D including a hydrogen pellet injector, which is being constructed by Oak Ridge National Laboratory. Upgrades to the cryosystem include: a recently commissioned 150 ell/hr helium liquefier, two 55 g/sec helium screw compressors, a fully automated 20-valve cryogen distribution box, a high efficiency helium wet expander, and the conversion of equipment from manual or pneumatic to programmable logic controller (PLC) control. The distribution box was designed and constructed for compactness due to limited space availability. Overall system efficiency was significantly improved by replacing the existing neutral beam reliquefier Joule-Thomson valve with a reciprocating wet expander. The implementation of a PLC-based automatic control system has resulted in increased efficiency and reliability. This paper will describe the cryosystem design with emphasis on newly added equipment. In addition, performance and operational experience will be discussed

  7. The DIII-D cryogenic system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Schaubel, K.M.; Laughon, G.J.; Campbell, G.L.; Langhorn, A.R.; Stevens, N.C.; Tupper, M.L.

    1993-10-01

    The original DIII-D cryogenic system was commissioned in 1981 and was used to cool the cryopanel arrays for three hydrogen neutral beam injectors. Since then, new demands for liquid helium have arisen including: a fourth neutral beam injector, ten superconducting magnets for the electron cyclotron heating gyrotrons, and more recently, the advanced diverter cryopump which resides inside the tokamak vacuum vessel. The original cryosystem could not meet these demands. Consequently, the cryosystem was upgraded in several phases to increase capacity, improve reliability, and reduce maintenance. The majority of the original system has been replaced with superior equipment. The capacity now exists to support present as well as future demands for liquid helium at DIII-D including a hydrogen pellet injector, which is being constructed by Oak Ridge National Laboratory. Upgrades to the cryosystem include: a recently commissioned 150 {ell}/hr helium liquefier, two 55 g/sec helium screw compressors, a fully automated 20-valve cryogen distribution box, a high efficiency helium wet expander, and the conversion of equipment from manual or pneumatic to programmable logic controller (PLC) control. The distribution box was designed and constructed for compactness due to limited space availability. Overall system efficiency was significantly improved by replacing the existing neutral beam reliquefier Joule-Thomson valve with a reciprocating wet expander. The implementation of a PLC-based automatic control system has resulted in increased efficiency and reliability. This paper will describe the cryosystem design with emphasis on newly added equipment. In addition, performance and operational experience will be discussed.

  8. PBX-M upgrade for advanced stabilization and profile control studies

    International Nuclear Information System (INIS)

    Kugel, H.W.; Kozub, T.; Barnes, G.

    1995-01-01

    PBX-M upgrades have been in progress for enhanced capability and reliability. These include upgrades to the vessel O-ring system for impurity control, the Ion Bernstein Wave and Lower Hybrid Current Drive Systems for plasma profile control, a double viewing upper and lower CHERS based Poloidal Rotation Diagnostic, and a new digital plasma control system

  9. Upgrades of the ATLAS trigger system

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221618; The ATLAS collaboration

    2018-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. \\\\ By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions ...

  10. Upgrading safety systems of industrial irradiation facilities

    International Nuclear Information System (INIS)

    Gomes, R.S.; Gomes, J.D.R.L.; Costa, E.L.C.; Costa, M.L.L.; Thomé, Z.D.

    2017-01-01

    The first industrial irradiation facility in operation in Brazil was designed in the 70s. Nowadays, twelve commercial and research facilities are in operation and two already decommissioned. Minor modifications and upgrades, as sensors replacement, have been introduced in these facilities, in order to reduce the technological gap in the control and safety systems. The safety systems are designed in agreement with the codes and standards at the time. Since then, new standards, codes and recommendations, as well as lessons learned from accidents, have been issued by various international committees or regulatory bodies. The rapid advance of the industry makes the safety equipment used in the original construction become obsolete. The decreasing demand for these older products means that they are no longer produced, which can make it impossible or costly to obtain spare parts and the expansion of legacy systems to include new features. This work aims to evaluate existing safety systems at Brazilian irradiation facilities, mainly the oldest facilities, taking into account the recommended IAEA's design requirements. Irrespective of the fact that during its operational period no event with victims have been recorded in Brazilian facilities, and that the regulatory inspections do not present any serious deviations regarding the safety procedures, it is necessary an assessment of safety system with the purpose of bringing their systems to 'the state of the art', avoiding their rapid obsolescence. This study has also taken into account the knowledge, concepts and solutions developed to upgrading safety system in irradiation facilities throughout the world. (author)

  11. Upgrading safety systems of industrial irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gomes, R.S.; Gomes, J.D.R.L.; Costa, E.L.C.; Costa, M.L.L., E-mail: rogeriog@cnen.gov.br, E-mail: jlopes@cnen.gov.br, E-mail: evaldo@cnen.gov.br, E-mail: mara@cnen.gov.br [Comissão Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil). Diretoria de Radioproteção e Segurança Nuclear; Thomé, Z.D., E-mail: zielithome@gmail.com [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil). Seção de Engenharia Nuclear

    2017-07-01

    The first industrial irradiation facility in operation in Brazil was designed in the 70s. Nowadays, twelve commercial and research facilities are in operation and two already decommissioned. Minor modifications and upgrades, as sensors replacement, have been introduced in these facilities, in order to reduce the technological gap in the control and safety systems. The safety systems are designed in agreement with the codes and standards at the time. Since then, new standards, codes and recommendations, as well as lessons learned from accidents, have been issued by various international committees or regulatory bodies. The rapid advance of the industry makes the safety equipment used in the original construction become obsolete. The decreasing demand for these older products means that they are no longer produced, which can make it impossible or costly to obtain spare parts and the expansion of legacy systems to include new features. This work aims to evaluate existing safety systems at Brazilian irradiation facilities, mainly the oldest facilities, taking into account the recommended IAEA's design requirements. Irrespective of the fact that during its operational period no event with victims have been recorded in Brazilian facilities, and that the regulatory inspections do not present any serious deviations regarding the safety procedures, it is necessary an assessment of safety system with the purpose of bringing their systems to 'the state of the art', avoiding their rapid obsolescence. This study has also taken into account the knowledge, concepts and solutions developed to upgrading safety system in irradiation facilities throughout the world. (author)

  12. The ALICE Inner Tracking System Upgrade

    CERN Document Server

    Siddhanta, Sabyasachi

    2015-01-01

    The long term plan of ALICE (A Large Ion Collider Experiment) at the CERN Large Hadron Collider (LHC) is a detailed investigation and characterisation of the Quark-Gluon Plasma (QGP). ALICE has devised a comprehensive upgrade strategy to enhance its physics capabilities and to exploit the LHC running conditions after the second long shutdown of the LHC scheduled in 2019-20. The upgraded ALICE will focus on high precision measurements of rare probes over a wide range of momenta, which will significantly improve the performance with respect to the present experimental set up. The upgrade strategy is based on the fact that after LS2 LHC will progressively increase its luminosity with Pb beams eventually reaching an interaction rate of about 50 kHz. To exploit the new LHC capabilities, several existing detectors will undergo a substantial upgrade and new detectors will be added. Within this upgrade strategy, the Inner Tracking System (ITS) upgrade forms an important cornerstone, providing precise measurements for...

  13. Upgrade and optimization of control systems help E.ON's Scholven plant to increase plant lifecycle and meet new market requirements

    Energy Technology Data Exchange (ETDEWEB)

    Alexander Frick; Joerg Orth

    2006-07-01

    A large percentage of Germany's installed base of power stations will continue to operate well into the next decade. E.ON therefore continues to focus on optimizing and maintaining its operating plants. A key component is the process control system - the data, information and nerve center of these plants. Parts shortages related to outdated technology and new, added process and operational requirements demand focused capital investment. E.ON has therefore implemented a program to upgrade a large part of the process control infrastructure at the Scholven facility. An important step was the successful replacement of the Unit C process control system during a ten-week maintenance outage in fall 2005. The new power station control system selected was ABB's System 800xA. 7 figs.

  14. Data logging system upgrade for Indus accelerator

    International Nuclear Information System (INIS)

    Mishra, R.; Merh, B.N.; Agrawal, R.K.; Fatnani, P.; Navathe, C.P.; Pal, S.

    2012-01-01

    An accelerator has various subsystems like Magnet Power Supply, Beam Diagnostics and Vacuum etc. which are required to work in a stable manner to ensure required machine performance. Logging of system parameters at a faster rate plays a crucial role in analysing and understanding machine behaviour. Logging all the machine parameters consistently at the rate of typically more than 1 Hz has been the aim of a recent data logging system upgrade. Nearly ten thousand parameters are being logged at varying intervals of one second to one minute in Indus accelerator complex. The present logging scheme is augmented to log all these parameters at a rate equal to or more than 1 Hz. The database schema is designed according to the data type of the parameter. The data is distributed into historical table and intermediate table which comprises of recent data. Machine control applications read the parameter values from the control system and store them into the text files of finite time duration for each sub-system. The logging application of each sub-system passes these text files to database for bulk insertion. The detail design of database, logging scheme and its architecture is presented in the paper. (author)

  15. Instrumentation and control upgrade evaluation methodology. Volume 1: Manual. Final report

    International Nuclear Information System (INIS)

    Bliss, M.; Brown, E.; Florio, F.; Stofko, M.

    1996-07-01

    This methodology manual describes how to develop an Upgrade Evaluation Report (UER) for an I and C system that has been identified as an upgrade candidate in the I and C Life Cycle Management Plan (LCMP). A UER can be developed by a nuclear power plant to determine the cost-effectiveness and feasibility of upgrading an aging or obsolete Instrumentation and Control (I and C) System. A separate UER is developed for each upgrade candidate system. A UER will determine if a given system requires an upgrade or if it is more cost-effective to maintain the present system. If an upgrade is unnecessary, the system will be reclassified as a retained system and a system maintenance plan will be developed for it. This manual is accompanied by a workbook (EPRI TR-104963-V2) which contains various worksheets, outlines, and generic interview questions that aid in the UER development process

  16. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    The three post-LS1 Phase 1 Upgrade projects (the L1-Trigger, Pixel Tracker, and HCAL) are all making excellent progress and are transitioning from the prototype to the execution phase. Meanwhile plans are developing for Phase 2, a major Upgrade programme targeting the third long shutdown, LS3. News on Phase 1 is included under the respective projects; we only provide a brief summary here. Phase 1 The plan for the L1 Trigger relies on the installation during the present shutdown of optical splitting for the Trigger input signals. This will allow the new Trigger system to be brought online and fully commissioned during beam operation in 2015, while CMS relies on the existing legacy Trigger for physics. Once fully commissioned the experiment can switch over to the new Trigger, which will provide greatly improved performance at high event pile-up, by 2016. System tests of the splitter system, and of the new architecture of the calorimeter trigger were very successful, and the work in LS1 is on-track. Prototype ...

  17. Climate balance of biogas upgrading systems

    International Nuclear Information System (INIS)

    Pertl, A.; Mostbauer, P.; Obersteiner, G.

    2010-01-01

    One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO 2 .

  18. Upgrade of ICRF heating system on EAST

    International Nuclear Information System (INIS)

    Chen Gen; Zhao Yanpin; Mao Yuzhou

    2013-01-01

    ICRF (Ion Cyclotron Range of Frequency) heating is an essential heating and current drive tool on EAST (Experimental Advanced Superconducting Tokamak). The high-power steady-state transmitters were designed as a part of research and development of ICRF heating system which aimed at output power of 1.5 MW for 1000 s in a frequency range of 25 to 70 MHz. There are 3 stage power amplifiers for each transmitter. Tube TH525A and TH535 were chosen for drive power amplifier (DPA) and final power amplifier (FPA), respectively. The power supply system of DPA and FPA were upgraded by using reliable PSM high voltage sources, whose response time is less than 5 μs. The ICRF system, which consists of 8 transmitters, will give out more than 10 MW total output power in the future. Four of them have been already fabricated, and another four are under construction. Three liquid stub tuners are used for impedance matching between antennas and transmitters, which can be only tuned shot to shot. There are two fast wave heating antennas which are assembled at I port and B port on EAST. Several projects are in progress including fast response impedance matching, distributed data acquisition and control system and so on for EAST ICRF heating system. (author)

  19. Upgrading of TARN-II vacuum system

    International Nuclear Information System (INIS)

    Chida, K.; Arakaki, Y.; Yoshizawa, M.; Tomizawa, M.; Tanabe, T.; Katayama, I.

    1994-01-01

    Ion pumps and titanium getter pumps have been increased nearly twice in the TARN-II. The pumping speed per unit length is now improved up to 2/3 times that of TARN-I. An average vacuum pressure of 10 -11 Torr order has been achieved at beam time. Performance of the system after the upgrading is reported. (author)

  20. Timing and Readout Contorl in the LHCb Upgraded Readout System

    CERN Document Server

    Alessio, Federico

    2016-01-01

    In 2019, the LHCb experiment at CERN will undergo a major upgrade where its detectors electronics and entire readout system will be changed to read-out events at the full LHC rate of 40 MHz. In this paper, the new timing, trigger and readout control system for such upgrade is reviewed. Particular attention is given to the distribution of the clock, timing and synchronization information across the entire readout system using generic FTTH technology like Passive Optical Networks. Moreover the system will be responsible to generically control the Front-End electronics by transmitting configuration data and receiving monitoring data, offloading the software control system from the heavy task of manipulating complex protocols of thousands of Front-End electronics devices. The way in which this was implemented is here reviewed with a description of results from first implementations of the system, including usages in test-benches, implementation of techniques for timing distribution and latency control."

  1. Upgrade of the ALICE Inner Tracking System

    OpenAIRE

    Reidt, Felix; Collaboration, for the ALICE

    2014-01-01

    During the Long Shutdown 2 of the LHC in 2018/2019, the ALICE experiment plans the installation of a novel Inner Tracking System. It will replace the current six layer detector system with a seven layer detector using Monolithic Active Pixel Sensors. The upgraded Inner Tracking System will have significantly improved tracking and vertexing capabilities, as well as readout rate to cope with the expected increased Pb-Pb luminosity of the LHC. The choice of Monolithic Active Pixel Sensors has be...

  2. Upgradation of automatic liquid scintillation counting system

    International Nuclear Information System (INIS)

    Bhattacharya, Sadhana; Behere, Anita; Sonalkar, S.Y.; Vaidya, P.P.

    2001-01-01

    This paper describes the upgradation of Microprocessor based Automatic Liquid Scintillation Counting systems (MLSC). This system was developed in 1980's and subsequently many systems were manufactured and supplied to Environment Survey labs at various Nuclear Power Plants. Recently this system has been upgraded to a more sophisticated one by using PC add-on hardware and developing Windows based software. The software implements more intuitive graphical user interface and also enhances the features making it comparable with commercially available systems. It implements data processing using full spectrum analysis as against channel ratio method adopted earlier, improving the accuracy of the results. Also it facilitates qualitative as well as quantitative analysis of the β-spectrum. It is possible to analyze a sample containing an unknown β-source. (author)

  3. Safety system upgrades to a research reactor: A regulatory perspective

    International Nuclear Information System (INIS)

    Lamarre, G.B.; Martin, W.G.

    2003-01-01

    The NRU (National Research Universal) reactor, located at the Chalk River Laboratories of Atomic Energy of Canada Limited (AECL), first achieved criticality November 3, 1957. AECL continues to operate NRU for research to support safety and reliability studies for CANDU reactors and as a major supplier of medical radioisotopes. Following a detailed systematic review and assessment of NRU's design and the condition of its primary systems, AECL formally notified the Canadian Nuclear Safety Commission's (CNSC) predecessor - the Atomic Energy Control Board - in 1992 of its intention to upgrade NRU's safety systems. AECL proposed seven major upgrades to provide improvements in shutdown capability, heat removal, confinement, and reactor monitoring, particularly during and after a seismic event. From a CNSC perspective, these upgrades were necessary to meet modern safety standards. From the start of the upgrades project, the CNSC provided regulatory oversight aimed at ensuring that AECL maintained a structured approach to the upgrades. The elements of the approach include, but are not limited to, the determination of project milestones and target dates; the formalization of the design process and project quality assurance requirements; the requirements for updated documentation, including safety reports, safety notes and commissioning reports; and the approval and authorization process. This paper details, from a regulatory perspective, the structured approach used in approving the design, construction, commissioning and subsequent operation of safety system upgrades for an existing and operating research reactor, including the many challenges faced when attempting to balance the requirements of the upgrades project with AECL's need to keep NRU operating to meet its important research and production objectives. (author)

  4. Main Control Room Upgrade for Kori Unit 1 in Korea

    International Nuclear Information System (INIS)

    Ha, Jae Taeg; Choi, Moon Jae

    2014-01-01

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles

  5. Main Control Room Upgrade for Kori Unit 1 in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Taeg; Choi, Moon Jae [KEPCO, Daejeon (Korea, Republic of)

    2014-08-15

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles.

  6. CORRECTION SYSTEMS UPGRADE FOR THE SNS RING

    International Nuclear Information System (INIS)

    PAPAPHILIPPOU, Y.; GARDNER, C.J.; LEE, Y.Y.; WEI, J.

    2001-01-01

    In view of the changes in the design of the SNS ring from the original FODO lattice [l] to the 220m hybrid lattice [2] and finally 1.3GeV compatible 248m ring [3], complementary studies have been undertaken, in order to upgrade its correction packages. We review the evolution of the correction systems and present the accelerator physics studies for the adopted schemes and powering plan

  7. LHCb: Fast Readout Control for the upgraded readout architecture of the LHCb experiment at CERN

    CERN Multimedia

    Alessio, F

    2013-01-01

    The LHCb experiment at CERN has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity with an upgraded LHCb detector. As a consequence, the various LHCb sub-systems in the readout architecture will be upgraded to cope with higher sub-detector occupancies, higher rate, and higher readout load. The new architecture, new functionalities, and the first hardware implementation of a new LHCb Readout Control system (commonly referred to as S-TFC) for the upgraded LHCb experiment is here presented. Our attention is focused in describing solutions for the distribution of clock and timing information to control the entire upgraded readout architecture by profiting of a bidirectional optical network and powerful FPGAs, including a real-time mechanism to synchronize the entire system. Solutions and implementations are presented, together with first results on the simulation and the validation of the system.

  8. Upgrading the reactor noise diagnostic systems at the Paks NPP

    International Nuclear Information System (INIS)

    Czibok, T.; Dezsoe, Z.; Kiss, K.; Krinizs, K.; Lipcsei, S.

    2002-01-01

    The paper reports on the actual step in upgrading process of the reactor noise diagnostic systems at Paks NPP. This step has mainly a technical character. Renewal of facilities for signal conditioning and for data acquisition is going on. Autonomous systems at each of the four reactor units will be able to acquire a set of data series which can be arbitrarily chosen from the whole set of several hundred in-core neutron and other signals. The autonomous systems can be remotely controlled by a central computer through the local network. Modularity and extensibility are important features of the new systems: the size of the set of available signals can be extended and new modules for more advanced evaluations can be installed later. Present plans for system hardware upgrading are outlined, together with some technical details of measurement control, data acquisition moduls and network communication.(abstract)

  9. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

      LS1 and Phase 1 The detector projects targeting LS1 are progressing well, and a fully integrated schedule developed by Technical Coordination includes installation milestones and a detailed work-plan. The first chambers of the RPC system were produced and are being qualified. Production will ramp up this year to a rate of 20 chambers per month. 32 chambers of the CSC system have been fabricated for the ME4/2 CSC stations, and production proceeds at a rate of 4 per month. The new ME1/1 Front-End Board is in production and the off-detector electronics integration tests are ongoing. The new Theta Trigger Boards for the DT readout production is started and the relocation of the Sector Collector boards with new Optical Links as been successfully tested. All the components for the upgrade of the Forward Hadron Calorimeter PMTs have been received at CERN and assemblies are being qualified. The situation is similar for the Hadron Outer Calorimeter new SiPMs and readout modules. Three projects are plan...

  10. UPGRADES

    CERN Multimedia

    J. Butler and J. Nash

    2011-01-01

    Recent progress on the CMS upgrades was summarised, in a workshop held at Fermilab between 7th and 10th November, attended by more than 150 people, many of whom came from Europe and Asia. Important goals of the workshop were to begin to formulate a schedule for the upgrades and to determine project interdependencies. Input was received from all the upgrade working groups and will be combined into a first-pass schedule over the next several weeks. In addition, technical progress on each of the major subtasks was presented and plans for the near-term future were established. Slides from the more than 100 talks are located at: https://indico.cern.ch/conferenceDisplay.py?confId=153564 In the opening plenary session, Frank Zimmermann, of the CERN Beams Department, gave his view of the LHC luminosity evolution. The luminosity will increase faster than we assumed in designing the upgrades. CMS will need to re-evaluate the current upgrade plans and revise them if necessary. CMS Upgrade Physics coordinator...

  11. Upgrading of Alum Preparation and Dosing Unit for Sharq Dijla Water Treatment Plant by Using Programmable Logic Controller System

    Directory of Open Access Journals (Sweden)

    Aumar Al-Nakeeb

    2018-02-01

    Full Text Available One of the important units in Sharq Dijla Water Treatment Plant (WTP first and second extensions are the alum solution preparation and dosing unit. The existing operation of this unit accomplished manually starting from unloading the powder alum in the preparation basin and ending by controlling the alum dosage addition through the dosing pumps to the flash mix chambers. Because of the modern trend of monitoring and control the automatic operation of WTPs due to the great benefits that could be gain from optimum equipment operation, reducing the operating costs and human errors. This study deals with how to transform the conventional operation to an automatic monitoring and controlling system depending on a Programmable Logic Controller (PLC and online sensors for alum preparation and dosing unit in Sharq Dijla WTP. PLC system will receive, analyze transmitting data, compare them with preset points then automatically orders the operational equipment (such as pumps, valves, and mixers in a way that guarantees the safe and appropriate operation of the unit. As a result of Process and Instrumentation Diagrams (PID that were prepared in this study, these units can be fully operating and manage by using Supervisory Control and Data Acquisition (SCADA system.

  12. Computer control of the titanium getter system on the tandem mirror experiment-upgrade (TMX-U)

    International Nuclear Information System (INIS)

    McAlice, A.J.; Bork, R.G.; Clower, C.A.; Moore, T.L.; Lang, D.D.; Pico, R.E.

    1983-01-01

    Gettering has been a standard technique for achieving high-quality vacuum in fusion experiments for some time. On Lawrence Livermore National Laboratory's Tandem Mirror Experiment (TMX-U), an extensive gettering system is utilized with liquid-nitrogen-cooled panels to provide the fast pumping during each physics experiment. The getter wires are a 85% titanium and 15% tantalum alloy directly heated by an electrical current. TMX-U has 162 getter power-supply channels; each channel supplies approximately 106 A of regulated power to each getter for a 60-s cycle. In the vacuum vessel, the getter wires are organized into poles or arrays. On each pole there are six getter wires, each cables to the exterior of the vessel. This arrangement allows the power supplies to be switched from getter wire to getter wire as the individual wires deteriorate after 200 to 300 gettering cycles. To control the getter power suppiles, we will install a computer system to operate the system and document the performance of each getter circuit. This computer system will control the 162 power supplies via a Computer Automated Measurement and Control (CAMAC) architecture with a fiber-optic serial highway. Getter wire history will be stored on the built-in 10 megabyte disc drive with new entries backed up daily on a floppy disc. Overall, this system will allow positive tracking of getter wire condition, document the total gettering performance, and predict getter maintenance/changeover cycles. How we will employ the computer system to enhance the getter system is the subject of this paper

  13. Replacement strategy for ASDEX upgrade's new control and data acquisition

    International Nuclear Information System (INIS)

    Raupp, G.; Behler, K.; Cole, R.; Engelhardt, K.; Lohs, A.; Lueddecke, K.; Neu, G.; Treutterer, W.; Vijverberg, Th.; Zasche, D.; Zehetbauer, Th.

    2004-01-01

    ASDEX Upgrade is being equipped with a new real-time plasma control and data acquisition system and a novel time system. Major components were implemented and installed. While much work for performance optimisation and application programming remains to be done, commissioning of the new system parallel to experiment operation is being prepared. Commissioning of the new system will be done step-by-step. To facilitate testing the old and new control systems share all input signals. Switching between old and new system can be performed within 60 min: 23 fibre optics for output of actuator commands and input triggers must be connected to the active system and minor modifications done to interface the machine protection. Commissioning phases include background listening, technical discharges and full plasma operation. With the strategy chosen we minimize risk to the machine and reduce interference with ongoing experiment campaigns

  14. Quality upgrading and cost reducing effects of using an operation control system for performance of maintenance tasks

    International Nuclear Information System (INIS)

    Ramler, K.

    1996-01-01

    According to available results, the use of an operation control system has come up to expections with respect to a quality enhancement of maintenance work. The tasks are performed more safely and there is more insight into the processes. so that, as indirect results, cost savings and rationalisation effects are to be expected. However, the cost savings achieved through the operation control system for maintenance tasks will remain modest. The truly cost-effective optimisation potentials in the maintenance area primarily consist in a reduction of preventive measures to the required scope, i.e reduction of the envisaged quantity of processes for maintenance and recurrent inspection. In order to extend savings to the organisational level, with respect to personnel expenditure, by DP supported maintenance planning, a suitable optimisation of the organisational structure and personnel employment is inevitable, because otherwise the rationalisation potentials will remain utopia. (orig.) [de

  15. The CEBAF RF Separator System Upgrade

    International Nuclear Information System (INIS)

    Hovater, J.; Mark Augustine; Al Guerra; Richard Nelson; Robert Terrell; Mark Wissmann

    2004-01-01

    The CEBAF accelerator uses RF deflecting cavities operating at the third sub-harmonic (499 MHz) of the accelerating frequency (1497 MHz) to ''kick'' the electron beam to the experimental halls. The cavities operate in a TEM dipole mode incorporating mode enhancing rods to increase the cavity's transverse shunt impedance [1]. As the accelerators energy has increased from 4 GeV to 6 GeV the RF system, specifically the 1 kW solid-state amplifiers, have become problematic, operating in saturation because of the increased beam energy demands. Two years ago we began a study to look into replacement for the RF amplifiers and decided to use a commercial broadcast Inductive Output Tube (IOT) capable of 30 kW. The new RF system uses one IOT amplifier on multiple cavities as opposed to one amplifier per cavity as was originally used. In addition, the new RF system supports a proposed 12 GeV energy upgrade to CEBAF. We are currently halfway through the upgrade with three IOTs in operation and the remaining one nearly installed. This paper reports on the new RF system and the IOT performance

  16. Work plan for upgrade of SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control Systemm (DACS-1)

    International Nuclear Information System (INIS)

    Truitt, R.W.

    1994-08-01

    The purpose of this effort is to upgrade the existing DACS-1 used for control and data acquisition in support of the hydrogen mitigation program for tank 101-SY. The planned upgrades will enhance the system capabilities to support additional mitigation projects and improve the system operability by implementing changes identified during operation of the system to date. Once the upgrades have been implemented, the DACS-1 system should operate as it did prior to the upgrade, but with greatly increased speed and capability. No retraining of Test Engineers will be required; the upgrade is designed to be transparent to those who operate it, with only a noticeable increase in the speed of the system. This work plan defines the tasks required for implementing the upgrade. It identifies deliverables, responsible organizations and individuals, interfaces, and schedule. This upgrade effort employs system engineering principles wherever applicable

  17. Thermal System Upgrade of the Space Environment Simulation Test Chamber

    Science.gov (United States)

    Desai, Ashok B.

    1997-01-01

    The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.

  18. Control and data acquisition upgrades for NSTX-U

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.M., E-mail: bdavis@pppl.gov; Tchilinguirian, G.J., E-mail: gtchilin@pppl.gov; Carroll, T., E-mail: tcarroll@pppl.gov; Erickson, K.G., E-mail: kerickson@pppl.gov; Gerhardt, S.P., E-mail: sgerhardt@pppl.gov; Henderson, P., E-mail: phenderson@pppl.gov; Kampel, S.H., E-mail: skampel@pppl.gov; Sichta, P., E-mail: psichta@pppl.gov; Zimmer, G.N., E-mail: gzimmer@pppl.gov

    2016-11-15

    Highlights: • The NSTX-U upgrade is nearing completion, and various control and data acquisition upgrades are needed. • The Digital Coil Protection System is a major addition which provides hardware and software to protect the magnetic coils from the complex, increased, stresses added from the upgrade. • The increased computational requirements for the upgrade have largely followed Moore’s Law, and enhancements to the infrastructure and computer hardware should maintain or exceed the previous functionality. • Data requirements for Fast 2-D cameras have exceeded those of “conventional” time-varying signals. There has been a particular emphasis and increase in data from IR cameras. - Abstract: The extensive NSTX Upgrade (NSTX-U) Project includes major components which allow a doubling of the toroidal field strength to 1 T, of the Neutral Beam heating power to 12 MW, and the plasma current to 2 MA, and substantial structural enhancements to withstand the increased electromagnetic loads. The maximum pulse length will go from 1.5 to 5 s. The larger and more complex forces on the coils will be protected by a Digital Coil Protection System, which requires demanding real-time data input rates, calculations and responses. The amount of conventional digitized data for a given pulse is expected to increase from 2.5 to 5 GB per second of pulse. 2-D Fast Camera data is expected to go from 2.5 GB/pulse to 10, and another 2 GB/pulse is expected from new IR cameras. Our network capacity will be increased by a factor of 10, with 10 Gb/s fibers used for the major trunks. 32-core Linux systems will be used for several functions, including between-shot data processing, MDSplus data serving, between-shot EFIT analysis, real-time processing, and for a new capability, between-shot TRANSP. Improvements to the MDSplus events subsystem will be made through the use of both UDP and TCP/IP based methods and the addition of a dedicated “event server”.

  19. Upgrade of the LHCb ECAL monitoring system

    CERN Document Server

    Guz, Yu

    2015-01-01

    The LHCb ECAL is a shashlik calorimeter of 6016 cells, covering 7.68 x 6.24 m$^2$ area. To monitor the readout chain of each ECAL cell, the LHCb ECAL is equipped with a LED based monitoring system. During the LHC Run I (2009-2012) it was found that the precision of the monitoring suffers from the radiation degradation of transparency of polystyrene clear fibers used to transport the LED light to the ECAL photomultipliers. In order to improve the performance of the monitoring system, and especially in view of significant increase of LHCb working luminosity foreseen after 2018, the present plastic fibers have been replaced by radiation hard quartzfi bers. The performance of the old LHCb ECAL monitoring system during LHC Run I and the design of the upgraded system are discussed here.

  20. Search for supersymmetric top-quark partners using support vector machines and upgrade of the hadron calorimeter front-end readout control system at CMS

    Energy Technology Data Exchange (ETDEWEB)

    Sahin, Mehmet Oezguer

    2017-04-15

    previous searches with the 8 TeV center-of-mass energy in the single lepton final states is extended to m{sub t} = 675 GeV and m{sub χ{sup 0}} = 225 GeV. The results of the present analysis once again verified the necessity to reach higher center-of-mass energies and luminosities at the LHC. Such an upgrade will increase the radiation exposure of the readout electronics. A reliable operation of the detector electronics under these harsh conditions is absolutely crucial. Therefore, a new front-end readout control system has been integrated to the upgraded electronics infrastructure of the CMS HCAL, which simultaneously sets up and controls all front-end modules. Furthermore, it recovers diagnostic information and responses immediately in case of unexpected events. A firmware for the next-generation Front-End-Control module helping to accomplish these tasks has been developed. Consistency and reliability of the control system is successfully tested in the test-stands and irradiation beam tests.

  1. Search for supersymmetric top-quark partners using support vector machines and upgrade of the hadron calorimeter front-end readout control system at CMS

    International Nuclear Information System (INIS)

    Sahin, Mehmet Oezguer

    2017-04-01

    the 8 TeV center-of-mass energy in the single lepton final states is extended to m_t = 675 GeV and m_χ_"0 = 225 GeV. The results of the present analysis once again verified the necessity to reach higher center-of-mass energies and luminosities at the LHC. Such an upgrade will increase the radiation exposure of the readout electronics. A reliable operation of the detector electronics under these harsh conditions is absolutely crucial. Therefore, a new front-end readout control system has been integrated to the upgraded electronics infrastructure of the CMS HCAL, which simultaneously sets up and controls all front-end modules. Furthermore, it recovers diagnostic information and responses immediately in case of unexpected events. A firmware for the next-generation Front-End-Control module helping to accomplish these tasks has been developed. Consistency and reliability of the control system is successfully tested in the test-stands and irradiation beam tests.

  2. Upgrade of the ALICE Inner Tracking System

    CERN Document Server

    INSPIRE-00246160

    2015-05-20

    {During the Long Shutdown 2 (LS2) of the LHC in 2018/2019, the ALICE experiment plans the installation of a novel Inner Tracking System (ITS). The upgraded detector will fully replace the current ITS having six layers by seven layers of Monolithic Active Pixel Sensors (MAPS). The upgraded ITS will have significantly improved tracking and vertexing capabilities, as well as readout rate to cope with the expected increased Pb-Pb luminosity in LHC. The choice of MAPS has been driven by the specific requirements of ALICE as a heavy ion experiment dealing with rare probes at low $p_\\mathrm{T}$. This leads to stringent requirements on the material budget of 0.3$\\%~X/X_{0}$ per layer for the three innermost layers. Furthermore, the detector will see large hit densities of $\\sim 19~\\mathrm{cm}^{-2}/\\mathrm{event}$ on average for minimum-bias events in the inner most layer and has to stand moderate radiation loads of 700 kRad TID and $1\\times 10^{13}$ 1 MeV n$_\\mathrm{eq}/\\mathrm{cm}^{2}$ NIEL at maximum. The MAPS dete...

  3. Abnormal condition and events analysis for instrumentation and control systems. Volume 1: Methodology for nuclear power plant digital upgrades. Final report

    International Nuclear Information System (INIS)

    McKemy, S.; Marcelli, M.; Boehmer, N.; Crandall, D.

    1996-01-01

    The ACES project was initiated to identify a cost-effective methodology for addressing abnormal conditions and events (ACES) in digital upgrades to nuclear power plant systems, as introduced by IEEE Standard 7-4.3.2-1993. Several methodologies and techniques currently in use in the defense, aerospace, and other communities for the assurance of digital safety systems were surveyed, and although several were shown to possess desirable qualities, non sufficiently met the needs of the nuclear power industry. This report describes a tailorable methodology for performing ACES analysis that is based on the more desirable aspects of the reviewed methodologies and techniques. The methodology is applicable to both safety- and non-safety-grade systems, addresses hardware, software, and system-level concerns, and can be applied in either a lifecycle or post-design timeframe. Employing this methodology for safety systems should facilitate the digital upgrade licensing process

  4. Upgraded HFIR Fuel Element Welding System

    International Nuclear Information System (INIS)

    Sease, John D.

    2010-01-01

    The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

  5. Mold Heating and Cooling Pump Package Operator Interface Controls Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Josh A. Salmond

    2009-08-07

    The modernization of the Mold Heating and Cooling Pump Package Operator Interface (MHC PP OI) consisted of upgrading the antiquated single board computer with a proprietary operating system to off-the-shelf hardware and off-the-shelf software with customizable software options. The pump package is the machine interface between a central heating and cooling system that pumps heat transfer fluid through an injection or compression mold base on a local plastic molding machine. The operator interface provides the intelligent means of controlling this pumping process. Strict temperature control of a mold allows the production of high quality parts with tight tolerances and low residual stresses. The products fabricated are used on multiple programs.

  6. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2012-01-01

      Good progress is being made on the projects that will be installed during LS1. CSC chamber production for ME4/2 is progressing at a rate of four chambers per month, with 25 built so far, and the new electronics for ME1/1 is undergoing a pre-production integration testing. For the RPC chambers, gap production is underway with first deliveries to the chamber assembly sites at CERN and Ghent. The third site at Mumbai will begin production next month. For the PMT replacement in the forward hadron calorimeters (HF), the 1728 PMTs are all characterised and ready to be installed. Testing of the electronics boards is going well. Preparations to replace the HPDs in the outer calorimeter (HO) with SiPMs are also on-track. All components are at CERN and burn-in of the new front-end electronics is proceeding. There are three major upgrade projects targeting the period from LS1 through LS2: a new pixel detector, upgraded photo-detectors and electronics for HCAL, and development of a new L1 Trigger. The new ...

  7. UPGRADES

    CERN Multimedia

    Didier Contardo

    2012-01-01

      The CMS Upgrade Programme is making good progress on the LS1 and Phase 1 projects, in the planning for Phase 2. The construction of the ME4/2 muon chambers to be installed during LS1 has started and the two first CSC production chambers have been fully qualified. The three muon groups have recently established a set of milestones towards the completion of their project, that will be integrated in the detailed planning and scheduling for the shutdown work established by Technical Coordination. The project to replace the photo-detectors in the HF and HO calorimeters is also well advanced and at the validation stage. The operation of an HF slice with new multi-anode PMTs and back-end electronics has already been demonstrated in 2012. For the Phase 1 data-taking, as discussed in the Chamonix workshop, it is likely that the LHC performance will exceed the nominal luminosity and pile-up before the second shutdown, still scheduled in 2018. The collaboration is therefore pursuing a strategy to upgrade ...

  8. Control processes and machine protection on ASDEX Upgrade

    International Nuclear Information System (INIS)

    Raupp, G.; Treutterer, W.; Mertens, V.; Neu, G.; Sips, A.; Zasche, D.; Zehetbauer, Th.

    2007-01-01

    Safe operation of ASDEX Upgrade is guaranteed by a conventional hierarchy of simple and robust hard-wired systems for personnel and machine protection featuring standardized switch-off procedures. Machine protection and handling of off-normal events is further enhanced and peak and lifetime stress minimized through the plasma control system. Based on a real-time process model supporting safety critical applications with data quality tagging, process self-monitoring, watchdog monitoring and alarm propagation, processes detect complex and critical failures and reliably perform case-sensitive counter measures. Intelligent real-time failure handling is done with hardware or software redundancy and performance degradation, or modification of reference values to continue or terminate discharges with reduced machine stress. Examples implemented so far on ASDEX Upgrade are given, such as recovery from measurement failures, switch-over of redundant actuators, handling of actuator limitations, detection of plasma instabilities, plasma state dependent soft landing, or handling of failed switch-off procedures through breakers disconnecting the machine from grid

  9. Emission and thermal performance upgrade through advanced control backfit

    Energy Technology Data Exchange (ETDEWEB)

    Banerjee, A.K. [Stone & Webster Engineering Corporation, Boston, MA (United States)

    1994-12-31

    Reducing emission and improving thermal performance of currently operating power plants is a high priority. A majority of these power plants are over 20 years old with old control systems. Upgrading the existing control systems with the latest technology has many benefits, the most cost beneficial are the reduction of emission and improving thermal performance. The payback period is usually less than two years. Virginia Power is installing Stone & Webster`s NO{sub x} Emissions Advisor and Advanced Steam Temperature Control systems on Possum Point Units 3 and 4 to achieve near term NO{sub x} reductions while maintaining high thermal performance. Testing has demonstrated NO{sub x} reductions of greater than 20 percent through the application of NO{sub x} Emissions Advisor on these units. The Advanced Steam Temperature Control system which has been operational at Virginia Power`s Mt. Storm Unit 1 has demonstrated a signification improvement in unit thermal performance and controllability. These control systems are being combined at Units 3 and 4 to reduce NO{sub x} emissions and achieve improved unit thermal performance and control response with the existing combustion hardware. Installation has been initiated and is expected to be completed by the spring of 1995. Possum Point Power Station Units 3 and 4 are pulverized coal, tangentially fired boilers producing 107 and 232 MW and have a distributed control system and a PC based performance monitoring system. The installation of the advanced control and automation system will utilize existing control equipment requiring the addition of several PCs and PLC.

  10. High intensity proton accelerator controls network upgrade

    International Nuclear Information System (INIS)

    Krempaska, R.; Bertrand, A.; Lendzian, F.; Lutz, H.

    2012-01-01

    The High Intensity Proton Accelerator (HIPA) control system network is spread through a vast area in PSI and it was grown historically in an unorganized way. The miscellaneous network hardware infrastructure and the lack of the documentation and components overview could no longer guarantee the reliability of the control system and the facility operation. Therefore, a new network, based on modern network topology, PSI standard hardware with monitoring and detailed documentation and overview was needed. The number of active components has been reduced from 25 to 9 Cisco Catalyst 24- or 48-port switches. They are the same type as other PSI switches, thus a replacement emergency stock is not an issue anymore. We would like to present how we successfully achieved this goal and the advantages of the clean and well documented network infrastructure. (authors)

  11. Material Control and Accounting (MC and A) System Upgrades and Performance Testing at the Russian Federal Nuclear Center-All-Russian Scientific Research Institute of Experimental Physics (RFNC-VNIIEF)

    International Nuclear Information System (INIS)

    Bushmelev, Vadim; Viktorov, Vladimir; Zhikharev, Stanislav; Yuferev, Vladimir; Singh, Surinder Paul; Kuzminski, Jozef; Hogan, Kevin; McKisson, Jacquelin

    2008-01-01

    The All-Russian Scientific Research Institute of Experimental Physics (VNIIEF), founded in 1946 at the historic village of Sarov, in Nizhniy Novgorod Oblast, is the largest nuclear research center in the Rosatom complex. In the framework of international collaboration, the United States (US) Department of Energy/National Nuclear Security Agency, in cooperation with US national laboratories, on the one hand, Rosatom and VNIIEF on the other hand, have focused their cooperative efforts to upgrade the existing material protection control and accountability system to prevent unauthorized access to the nuclear material. In this paper we will discuss the present status of material control and accounting (MC and A) system upgrades and the preliminary results from a pilot program on the MC and A system performance testing that was recently conducted at one technical area.

  12. Upgrading of the radiation protection system at the V1 NPP

    International Nuclear Information System (INIS)

    Dobis, L.; Kaizer, J.; Svitek, J.

    2003-01-01

    The original radiation protection system at Bohunice V1 NPP from the 1970s was upgraded so as to meet current national as well as international standards. The article describes the upgrading of the radiation control system (teledosimetry, emergency measurement in the hermetic zone, liquid discharges, gaseous discharges, service water, remote measurement, hygiene loop, contamination monitoring at the controlled zone exit and activity monitoring at the NPP exit, special laundry, instrument calibration), dosimetry, software, and personnel contamination inspection/measurement. (author)

  13. Operational test report integrated system test (ventilation upgrade)

    Energy Technology Data Exchange (ETDEWEB)

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  14. Operational test report, integrated system test (ventilation upgrade)

    International Nuclear Information System (INIS)

    HARTY, W.M.

    1999-01-01

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, AY102, AZ101, AZ102

  15. LHCb : Tracking system of the LHCb upgrade

    CERN Multimedia

    Szumlak, Tomasz

    2015-01-01

    The upgrade of the LHCb experiment will run at an instantaneous luminosity of 2x10^33 cm^-2 s^-1 with a fully software based trigger, allowing to read out the detector at a rate of 40MHz. For this purpose, the full tracking system will be newly developed: the vertex locator (VELO) will be replaced by a pixel-based detector, withstanding the high radiation dose and providing an excellent track reconstruction with an efficiency of above 99% for all charged particles of interest. Upstream of the magnet, a silicon mico-strip detector with a high granularity and an improved acceptance coverage, called the Upstream Tracker (UT), will replace the current silicon strip tracker, and provide a rough momentum estimate. The tracking system downstream of the magnet will be replaced by the Scintillating Fibre tracker (SciFi), which will consist of 12 layers using 2.5m long scintillating fibres read out by silicon photo-multipliers, providing a spatial resolution better than 100 micron and resulting in a total momentum reso...

  16. ACPR upgrade fuel motion detection system

    International Nuclear Information System (INIS)

    Kelly, J.G.; Stalker, K.T.

    1976-01-01

    Coded aperture imaging techniques are being applied to the problem of fuel motion detection in core disruptive safety experiments in the LMFBR. The upgraded Sandia Annular Core Pulse Reactor will be used for fuel motion studies, and a system is now being developed to image fuel motion through a slot in the core in l- and 7-pin experiments. The γ-rays emitted by the fuel will be modulated by a coded aperture and will form a pseudohologram on a scintillator. This shadowgram will be lens coupled first to an optical image intensifier, and then to a rotating prism framing camera. The goal is to obtain quality images of fuel with approximately 1 mm spatial resolution at about 10 4 frames/sec. Some of the feasibility milestones which have been reached thus far are the following: (1) A fuel pin shaped 252 Cf fission gamma ray source has been imaged through 1.27 cm of steel (simulating reactor containment). (2) A 252 Cf source has been imaged through 1.27 cm of steel with x-ray image intensifier amplification. (3) Collimation and shielding tests indicate that at ACPR it should be possible to obtain adequate signal to noise at the detector when the fuel is observed through a slot in the core

  17. Formation and control of plasma potentials in TMX upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Simonen, T.C.; Orzechowski, T.J.; Porkolab, M.; Stallard, B.W.

    1981-05-06

    The methods to be employed to form and control plasma potentials in the TMX Upgrade tandem mirror with thermal barriers are described. ECRH-generated mirror -confined electron plasmas are used to establish a negative potential region to isolate the end-plug and central-cell celectrons. This thermal isolation will allow a higher end-plug electron temperature and an increased central-cell confining potential. Improved axial central-cell ion confinement results since higher temperature central-cell ions can be confined. This paper describes: (1) calculations of the sensitivity of barrier formation to vacuum conditions and to the presence of impurities in the neutral beams, (2) calculations of microwave penetration and absorption used to design the ECRH system, and (3) techniques to limit electron runaway to high energies by localized microwave beams and by relativistic detuning.

  18. Formation and control of plasma potentials in TMX upgrade

    International Nuclear Information System (INIS)

    Simonen, T.C.; Orzechowski, T.J.; Porkolab, M.; Stallard, B.W.

    1981-01-01

    The methods to be employed to form and control plasma potentials in the TMX Upgrade tandem mirror with thermal barriers are described. ECRH-generated mirror -confined electron plasmas are used to establish a negative potential region to isolate the end-plug and central-cell celectrons. This thermal isolation will allow a higher end-plug electron temperature and an increased central-cell confining potential. Improved axial central-cell ion confinement results since higher temperature central-cell ions can be confined. This paper describes: (1) calculations of the sensitivity of barrier formation to vacuum conditions and to the presence of impurities in the neutral beams, (2) calculations of microwave penetration and absorption used to design the ECRH system, and (3) techniques to limit electron runaway to high energies by localized microwave beams and by relativistic detuning

  19. Commissioning of inline ECE system within waveguide based ECRH transmission systems on ASDEX upgrade

    DEFF Research Database (Denmark)

    Bongers, W. A.; Kasparek, W.; Doelman, N.

    2012-01-01

    A CW capable inline electron cyclotron emission (ECE) separation system for feedback control, featuring oversized corrugated waveguides, is commissioned on ASDEX upgrade (AUG). The system is based on a combination of a polarization independent, non-resonant, Mach-Zehnder diplexer equipped with di...

  20. Commissioning of inline ECE system within waveguide based ECRH transmission systems on ASDEX upgrade

    NARCIS (Netherlands)

    Bongers, W.A.; Kasparek, W.; Doelman, N. J.; Braber, R. van den; Brand, H. van den; Meo, F.; Baar, M.R. de; Amerongen, F.J.; Donné, A.J.H.; Elzendoorn, B.S.Q.; Erckmann, V.; Goede, A.P.H.; Giannone, L.; Grünwald, G.; Hollman, F.; Kaas, G.; Krijger, B.; Michel, G.; Lubyako, L.; Monaco, F.; Noke, F.; Petelin, M.; Plaum, B.; Purps, F.; Pierik, J.G.W. ten; Schüller, C.; Slob, J.W.; Stober, J.K.; Schütz, H.; Wagner, D.; Westerhof, E.; Ronden, D.M.S.

    2012-01-01

    A CW capable inline electron cyclotron emission (ECE) separation system for feedback control, featuring oversized corrugated waveguides, is commissioned on ASDEX upgrade (AUG). The system is based on a combination of a polarization independent, non-resonant, Mach-Zehnder diplexer equipped with

  1. Microprocessor tester for the treat upgrade reactor trip system

    International Nuclear Information System (INIS)

    Lenkszus, F.R.; Bucher, R.G.

    1984-01-01

    The upgrading of the Transient Reactor Test (TREAT) Facility at ANL-Idaho has been designed to provide additional experimental capabilities for the study of core disruptive accident (CDA) phenomena. In addition, a programmable Automated Reactor Control System (ARCS) will permit high-power transients up to 11,000 MW having a controlled reactor period of from 15 to 0.1 sec. These modifications to the core neutronics will improve simulation of LMFBR accident conditions. Finally, a sophisticated, multiply-redundant safety system, the Reactor Trip System (RTS), will provide safe operation for both steady state and transient production operating modes. To insure that this complex safety system is functioning properly, a Dedicated Microprocessor Tester (DMT) has been implemented to perform a thorough checkout of the RTS prior to all TREAT operations

  2. Upgrades and Real Time Ntm Control Application of the Ece Radiometer on Asdex Upgrade

    Science.gov (United States)

    Hicks, N. K.; Suttrop, W.; Behler, K.; Giannone, L.; Manini, A.; Maraschek, M.; Raupp, G.; Reich, M.; Sips, A. C. C.; Stober, J.; Treutterer, W.; ASDEX Upgrade Team; Cirant, S.

    2009-04-01

    The 60-channel electron cyclotron emission (ECE) radiometer diagnostic on the ASDEX Upgrade tokamak is presently being upgraded to include a 1 MHz sampling rate data acquisition system. This expanded capability allows electron temperature measurements up to 500 kHz (anti-aliasing filter cut-off) with spatial resolution ~1 cm, and will thus provide measurement of plasma phenomena on the MHD timescale, such as neoclassical tearing modes (NTMs). The upgraded and existing systems may be run in parallel for comparison, and some of the first plasma measurements using the two systems together are presented. A particular planned application of the upgraded radiometer is integration into a real-time NTM stabilization loop using targeted deposition of electron cyclotron resonance heating (ECRH). For this loop, it is necessary to determine the locations of the NTM and ECRH deposition using ECE measurements. As the magnetic island of the NTM repeatedly rotates through the ECE line of sight, electron temperature fluctuations at the NTM frequency are observed. The magnetic perturbation caused by the NTM is independently measured using Mirnov coils, and a correlation profile between these magnetic measurements and the ECE data is constructed. The phase difference between ECE oscillations on opposite sides of the island manifests as a zero-crossing of the correlation profile, which determines the NTM location in ECE channel space. To determine the location of ECRH power deposition, the power from a given gyrotron may be modulated at a particular frequency. Correlation analysis of this modulated signal and the ECE data identifies a particular ECE channel associated with the deposition of that gyrotron. Real time equilibrium reconstruction allows the ECE channels to be translated into flux surface and spatial coordinates for use in the feedback loop.

  3. Human-machine interface aspects and use of computer-based operator support systems in control room upgrades and new control room designs for nuclear power plants

    International Nuclear Information System (INIS)

    Berg, O.

    1997-01-01

    At the Halden Project efforts are made to explore the possibilities through design, development and validation of Computer-based Operator Support Systems (COSSes) which can assist the operators in different operational situations, ranging from normal operation to disturbance and accident conditions. The programme comprises four main activities: 1) verification and validation of safety critical software systems; 2) man-machine interaction research emphasizing improvements in man-machine interfaces on the basis of human factors studies; 3) computerized operator support systems assisting the operator in fault detection/diagnosis and planning of control actions; and 4) control room development providing a basis for retrofitting of existing control rooms and for the design of advanced concepts. The paper presents the status of this development programme, including descriptions of specific operator support functions implemented in the simulator-based, experimental control room at Halden (HAMMLAB, HAlden Man-Machine LABoratory). These operator aids comprise advanced alarms systems, diagnostic support functions, electronic procedures, critical safety functions surveillance and accident management support systems. The different operator support systems development at the Halden Project are tested and evaluated in HAMMLAB with operators from the Halden Reactor, and occasionally from commercial NPPs, as test subjects. These evaluations provide data on the merits of different operator support systems in an advanced control room setting, as well as on how such systems should be integrated to enhance operator performance. The paper discusses these aspects and the role of computerized operator support systems in plant operation based on the experience from this work at the Halden Project. 15 refs, 5 figs

  4. Human-machine interface aspects and use of computer-based operator support systems in control room upgrades and new control room designs for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Berg, O [Institutt for Energiteknikk, OECD Halden Reactor Project (Netherlands)

    1997-07-01

    At the Halden Project efforts are made to explore the possibilities through design, development and validation of Computer-based Operator Support Systems (COSSes) which can assist the operators in different operational situations, ranging from normal operation to disturbance and accident conditions. The programme comprises four main activities: 1) verification and validation of safety critical software systems; 2) man-machine interaction research emphasizing improvements in man-machine interfaces on the basis of human factors studies; 3) computerized operator support systems assisting the operator in fault detection/diagnosis and planning of control actions; and 4) control room development providing a basis for retrofitting of existing control rooms and for the design of advanced concepts. The paper presents the status of this development programme, including descriptions of specific operator support functions implemented in the simulator-based, experimental control room at Halden (HAMMLAB, HAlden Man-Machine LABoratory). These operator aids comprise advanced alarms systems, diagnostic support functions, electronic procedures, critical safety functions surveillance and accident management support systems. The different operator support systems development at the Halden Project are tested and evaluated in HAMMLAB with operators from the Halden Reactor, and occasionally from commercial NPPs, as test subjects. These evaluations provide data on the merits of different operator support systems in an advanced control room setting, as well as on how such systems should be integrated to enhance operator performance. The paper discusses these aspects and the role of computerized operator support systems in plant operation based on the experience from this work at the Halden Project. 15 refs, 5 figs.

  5. Nuclear materials control and accountability criteria for upgrades measures

    Energy Technology Data Exchange (ETDEWEB)

    Erkkila, B.H.; Hatcher, C.R.

    1998-11-01

    As a result of major political and societal changes in the past several years, methods of nuclear material control may no longer be as effective as in the past in Russia, the Newly Independent States (NIS), and the Baltic States (BS). The objective of the Department of Energy (DOE) Material Protection, Control, and Accounting Program (MPC and A) is to reduce the threat of nuclear proliferation by collaborating with Russia, NIS, and BS governments to promote western-style MPC and A. This cooperation will improve the MPC and A on all weapons useable nuclear materials and will establish a sustainable infrastructure to provide future support and maintenance for these technology-based improvements. Nuclear materials of proliferation concern include materials of the types and quantities that can be most easily and directly used in a nuclear weapon. Sabotage of nuclear material is an event of great concern and potentially disastrous consequences to both the US and the host country. However, sabotage is currently beyond the scope of program direction and cannot be used to justify US-funded MPC and A upgrades. Judicious MPC and A upgrades designed to protect against insider and outsider theft scenarios would also provide addition, although not comprehensive, protection against saboteurs. This paper provides some suggestions to establish consistency in prioritizing system-enhancement efforts at nuclear material facilities. The suggestions in this paper are consistent with DOE policy and directions and should be used as a supplement to any policy directives issued by NN-40, DOE Russia/NIS Task Force.

  6. Nuclear materials control and accountability criteria for upgrades measures

    International Nuclear Information System (INIS)

    Erkkila, B.H.; Hatcher, C.R.

    1998-01-01

    As a result of major political and societal changes in the past several years, methods of nuclear material control may no longer be as effective as in the past in Russia, the Newly Independent States (NIS), and the Baltic States (BS). The objective of the Department of Energy (DOE) Material Protection, Control, and Accounting Program (MPC and A) is to reduce the threat of nuclear proliferation by collaborating with Russia, NIS, and BS governments to promote western-style MPC and A. This cooperation will improve the MPC and A on all weapons useable nuclear materials and will establish a sustainable infrastructure to provide future support and maintenance for these technology-based improvements. Nuclear materials of proliferation concern include materials of the types and quantities that can be most easily and directly used in a nuclear weapon. Sabotage of nuclear material is an event of great concern and potentially disastrous consequences to both the US and the host country. However, sabotage is currently beyond the scope of program direction and cannot be used to justify US-funded MPC and A upgrades. Judicious MPC and A upgrades designed to protect against insider and outsider theft scenarios would also provide addition, although not comprehensive, protection against saboteurs. This paper provides some suggestions to establish consistency in prioritizing system-enhancement efforts at nuclear material facilities. The suggestions in this paper are consistent with DOE policy and directions and should be used as a supplement to any policy directives issued by NN-40, DOE Russia/NIS Task Force

  7. Kongiganak Wind Turbine Replacement and System Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Boonstra, Patrick [Intelligent Energy Systems, Anchorage, AK (United States)

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  8. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  9. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  10. Instrumentation and control upgrade evaluation methodology: Final report. Volume 2: Workbook

    Energy Technology Data Exchange (ETDEWEB)

    Bliss, M.; Brown, E.; Florio, F.; Stofko, M.

    1996-07-01

    This workbook accompanies the methodology manual (EPRI TR-104963-V1) which describes how to develop an Upgrade Evaluation Report (UER). A UER is an evaluation that is performed by a nuclear power plant to decide the most cost-effective upgrade to perform (if any) for a previously identified Upgrade Candidate System. A UER defines the utility`s mission and objectives in regards to upgrade candidates, as well as the systems initial costs, benefits to each upgrade, and an initial upgrade schedule to cost-effectively implement system upgrades.

  11. Proceedings: Electromagnetic interference control in modern digital instrumentation and control upgrades

    International Nuclear Information System (INIS)

    1993-06-01

    A workshop on Electro-Magnetic Interference (EMI) Control in Modern Digital Instrumentation ampersand Control System Upgrade was held in Baltimore on September 10-11, 1992 to provide a forum for technology transfer, technical information exchange, and education. The workshop was attended by more than 70 representatives of electric utilities, equipment manufacturers, engineering consulting organizations, and government agencies. The workshop consists of four sessions: (1) Organizational EMC Perspectives, (2) EMI Environment, Case Histories ampersand Solutions, (3) EMC in Digital Instrumentation ampersand Control Systems, and (4) EMI Utility Needs. A group discussion followed the presentations to identify utility needs. Individual papers have been cataloged separately

  12. Upgrading instrumentation and control in nuclear power plants. Design criteria

    International Nuclear Information System (INIS)

    Rodriguez Rodriguez, M.C.; Alvarez Menendez, A.

    1997-01-01

    The use of programmed digital technology in Protection, Control, Monitoring and Information Systems in new generation nuclear power plants, or the use of this technology to replace or upgrade existing systems based on wired analog instrumentation and electromechanical relays, has led to new international standards which establish new design requirements or adapt existing requirements to this technology. Additionally, both regulatory organisations and the industry are discussing the reliability of this technology, regarding common mode failures that may occur in redundant protection channels, due to the use of equipment and software with the same characteristics. The first part of this paper addresses the most important aspects of new international standards regarding classification criteria for I and C systems, equipment and functions, depending on their importance to safety and the design criteria applicable to each category. Special attention is drawn to requirements concerning software quality assurance and the design of new control rooms. The paper then goes on to discuss the different technical solutions being implemented, using equipment and software diversification, in order to prevent the possibility of common mode failures affecting the protection function. (Author)

  13. Preparations for Upgrading the RF Systems of the PS Booster

    CERN Document Server

    Albright, Simon; Shaposhnikova, Elena

    2016-01-01

    The accelerators of the LHC injector chain need to be upgraded to provide the HL-LHC beams. The PS Booster, the first synchrotron in the LHC injection chain, uses three different RF systems (first, second and up to tenth harmonic) in each of its four rings. As part of the LHC Injector Upgrade the current ferrite RF systems will be replaced with broadband Finemet cavities, increasing the flexibility of the RF system. A Finemet test cavity has been installed in Ring 4 to investigate its effect on machine performance, especially beam stability, during extensive experimental studies. Due to large space charge impedance Landau damping is lost through most of the cycle in single harmonic operation, but is recovered when using the second harmonic and controlled longitudinal emittance blow-up. This paper compares beam parameters during acceleration with and without the Finemet test cavity. Comparisons were made using beam measurements and simulations with the BLonD code based on a full PS Booster impedance model. Thi...

  14. Operation of the Upgraded ATLAS Level-1 Central Trigger System

    CERN Document Server

    Glatzer, Julian Maximilian Volker; The ATLAS collaboration

    2015-01-01

    The ATLAS Level-1 Central Trigger (L1CT) system is a central part of ATLAS data-taking and has undergone a major upgrade for Run 2 of the LHC, in order to cope with the expected increase of instantaneous luminosity of a factor of 2 with respect to Run 1. The upgraded hardware offers more flexibility in the trigger decisions due to the double amount of trigger inputs and usable trigger channels. It also provides an interface to the new topological trigger system. Operationally - particularly useful for commissioning, calibration and test runs - it allows concurrent running of up to 3 different sub-detector combinations. In this contribution, we give an overview of the operational software framework of the L1CT system with particular emphasis of the configuration, controls and monitoring aspects. The software framework allows a consistent configuration with respect to the ATLAS experiment and the LHC machine, upstream and downstream trigger processors, and the data acquisition. Trigger and dead-time rates are m...

  15. The upgrade of the LHCb trigger system

    CERN Document Server

    INSPIRE-00259834; Fitzpatrick, C.; Gligorov, V.; Raven, G.

    2014-10-20

    The LHCb experiment will operate at a luminosity of $2\\times10^{33}$ cm$^{-2}$s$^{-1}$ during LHC Run 3. At this rate the present readout and hardware Level-0 trigger become a limitation, especially for fully hadronic final states. In order to maintain a high signal efficiency the upgraded LHCb detector will deploy two novel concepts: a triggerless readout and a full software trigger.

  16. TMX-Upgrade vacuum-system design and analysis

    International Nuclear Information System (INIS)

    Simonen, T.C.; Chargin, A.K.; Drake, R.P.; Nexsen, W.E.; Pickles, W.L.; Poulsen, P.; Stack, T.P.; Wong, R.L.

    1981-10-01

    This paper describes the design and analysis of the TMX Upgrade Vacuum System. TMX Upgrade is a modification of the TMX tandem mirror device. It will employ thermal barriers to further improve plasma confinement. Thermal barriers are produced by microwave heating and neutral-beam pumping. They increase the feasibility of tandem-mirror reactors by reducing both the required magnetic field strengths and the neutral-beam injection voltages

  17. Using Real Time Workshop for rapid and reliable control implementation in the Frascati Tokamak Upgrade Feedback Control System running under RTAI-GNU/Linux

    International Nuclear Information System (INIS)

    Centioli, C.; Iannone, F.; Ledauphin, M.; Panella, M.; Pangione, L.; Podda, S.; Vitale, V.; Zaccarian, L.

    2005-01-01

    The Feedback Control System running at FTU has been recently ported from a commercial platform (based on LynxOS) to an open-source GNU/Linux-based RTAI-LXRT platform, thereby, obtaining significant performance and cost improvements. Based on the new open-source platform, it is now possible to experiment novel control strategies aimed at improving the robustness and accuracy of the feedback control. Nevertheless, the implementation of control ideas still requires a great deal of coding of the control algorithms that, if carried out manually, may be prone to coding errors, therefore time consuming both in the development phase and in the subsequent validation tests consisting of dedicated experiments carried out on FTU. In this paper, we report on recent developments based on Mathworks' Simulink and Real Time Workshop (RTW) packages to obtain a user-friendly environment where the real time code implementing novel control algorithms can be easily generated, tested and validated. Thanks to this new tool, the control designer only needs to specify the block diagram of the control task (namely, a high level and functional description of the new algorithm under consideration) and the corresponding real time code generation and testing is completely automated without any need of dedicated experiments. In the paper, the necessary work carried out to adapt the Real Time Workshop to our RTAI-LXRT context will be illustrated. A necessary re-organization of the previous real time software, aimed at incorporating the code coming from the adapted RTW, will also be discussed. Moreover, we will report on a performance comparison between the code obtained using the automated RTW-based procedure and the hand-written C code, appropriately optimised; at the moment, a preliminary performance comparison consisting of dummy algorithms has shown that the code automatically generated from RTW is faster (about 30% up) than the manually written one. This preliminary result combined with the

  18. Upgrading nuclear material protection, control and accounting in Russia

    International Nuclear Information System (INIS)

    Caravelli, Jack; Behan, Chris; Fishbone, Les

    2001-01-01

    Full text: I. Program goal and organization - In this paper we review the Cooperative US-Russia Program of Nuclear Material Protection, Control and Accounting (MPC and A), whose goal is to reduce the risk of nuclear weapons proliferation by strengthening systems of MPC and A; thereby the Program enhances US national security. Based on this goal, the technical objective is to enhance, through US technical cooperation, the effectiveness of MPC and A systems at Russian sites with weapons-usable nuclear material, i.e. plutonium and highly enriched uranium. The Program exists because the extensive social, political and economic changes in Russia arising from the dissolution of the Soviet Union have increased the risk that these materials would be subject to theft or other misuse, with potentially grave consequences. On the US side, the MPC and A Program is administered by the US Department of Energy (DOE) National Nuclear Security Administration through the DOE national laboratories and other contractors. On the Russian side, the Program is administered by the Russian Ministry of Atomic Energy (Minatom) through its nuclear sites, by the regulatory agency Gosatomnadzor, and by nuclear sites not under Minatom. To carry out the Program objective, the DOE national laboratories consummate contracts with the Russian sites to implement agreed MPC and A upgrades. Deciding on what upgrades to perform depends on a cooperative analysis of site characteristics, materials, and vulnerabilities by joint US and Russian teams. Once the upgrades are agreed, the DOE laboratories supply technical and financial support and equipment to the Russian sites. The staff of the Russian sites do the work, and the US team members monitor the work through some combination - according to contract - of direct observation and reports, photographs and videotape supplied by the staff of the Russian sites. II. MPC and A task areas - Information in this review covers a selection of topical areas, with a

  19. Upgrades to the ATLAS trigger system   

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221618; The ATLAS collaboration

    2017-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions wit...

  20. Upgrade of ESO's FIERA CCD Controller and PULPO Subsystem

    Science.gov (United States)

    Reyes-Moreno, J.; Geimer, C.; Balestra, A.; Haddad, N.

    An overview of FIERA is presented with emphasis on its recent upgrade to PCI. The PCI board hosts two DSPs, one for real time control of the camera and another for on-the-fly processing of the incoming video data. In addition, the board is able to make DMA transfers, to synchronize to other boards alike, to be synchronized by a TIM bus and to control PULPO via RS232. The design is based on the IOP480 chip from PLX, for which we have developed a device driver for both Solaris and Linux. One computer is able to host more than one board and therefore can control an array of FIERA detector electronics. PULPO is a multifunctional subsystem widely used at ESO for the housekeeping of CCD cryostat heads and for shutter control. The upgrade of PULPO is based on an embedded PC running Linux. The upgraded PULPO is able to handle 29 temperature sensors, control 8 heaters and one shutter, read out one vacuum sensor and log any combination of parameters.

  1. Configuration-defined control algorithms with the ASDEX Upgrade DCS

    Energy Technology Data Exchange (ETDEWEB)

    Treutterer, Wolfgang, E-mail: Wolfgang.Treutterer@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Cole, Richard [Unlimited Computer Systems, Seeshaupter Str. 15, 82393 Iffeldorf Germany (Germany); Gräter, Alexander [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Lüddecke, Klaus [Unlimited Computer Systems, Seeshaupter Str. 15, 82393 Iffeldorf Germany (Germany); Neu, Gregor; Rapson, Christopher; Raupp, Gerhard; Zehetbauer, Thomas [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany)

    2016-11-15

    Highlights: • Control algorithm built from combination of pre-fabricated standard function blocks. • Seamless integration in multi-threaded computation context. • Block composition defined by configuration data, only. - Abstract: The ASDEX Upgrade Discharge Control System (DCS) is a distributed real-time control system executing complex control and monitoring tasks. Up to now, DCS control algorithms have been implemented by coding dedicated application processes with the C++ programming language. Algorithm changes required code modification, compilation and commissioning which only experienced programmers could perform. This was a significant constraint of flexibility for both control system operation and design. The new approach extends DCS with the capability of configuration-defined control algorithms. These are composed of chains of small, configurable standard function blocks providing general purpose functions like algebraic operations, filters, feedback controllers, output limiters and decision logic. In a later phase a graphical editor could help to compose and modify such configuration in a Simulink-like fashion. Building algorithms from standard functions can result in a high number of elements. In order to achieve a similar performance as with C++ coding, it is essential to avoid administrative bottlenecks by design. As a consequence, DCS executes a function block chain in the context of a single real-time thread of an application process. No concurrency issues as in a multi-threaded context need to be considered resulting in strongly simplified signal handling and zero performance overhead for inter-block communication. Instead of signal-driven synchronization, a block scheduler derives the execution sequence automatically from the block dependencies as defined in the configuration. All blocks and connecting signals are instantiated dynamically, based on definitions in a configuration file. Algorithms thus are not defined in the code but only in

  2. A 'Universal Time' system for ASDEX upgrade

    International Nuclear Information System (INIS)

    Raupp, Gerhard; Cole, R.; Behler, K.; Fitzek, M.; Heimann, P.; Lohs, A.; Lueddecke, K.; Neu, G.; Schacht, J.; Treutterer, W.; Zasche, D.; Zehetbauer, Th.; Zilker, M.

    2003-01-01

    For the new generation of intelligent controllers for plasma diagnostics, discharge control and long-pulse experiment control a new time system supporting steady state real-time operation has been devised. A central unit counts time at nanosecond resolution, covering more than the experiment lifetime. The broadcast time information serves local units to perform application functions such as current time readout, trigger generation and sample time measurement. Time is treated as a precisely measured quantity like other physical quantities. Tagging all detected events and sampled values with measured times as [value; time]-entities facilitates real-time data analysis, steady state protocolling and time-sorted archiving

  3. Nuclear power plant security systems - The need for upgrades

    International Nuclear Information System (INIS)

    Murskyj, M.P.; Furlow, C.H.

    1989-01-01

    Most perimeter security systems for nuclear power plants were designed and installed in the late 1970s or early 1980s. This paper explores the need to regularly evaluate and possibly upgrade a security system in the area of perimeter intrusion detection and surveillance. this paper discusses US Nuclear Regulatory Commission audits and regulatory effectiveness reviews (RERs), which have raised issues regarding the performance of perimeter security systems. The audits and RERs identified various degrees of vulnerability in certain aspects of existing perimeter security systems. In addition to reviewing the regulatory concerns, this paper discusses other reasons to evaluate and/or upgrade a perimeter security system

  4. Prototype of time digitizing system for BESⅢ endcap TOF upgrade

    International Nuclear Information System (INIS)

    Cao Ping; Sun Weijia; Fan Huanhuan; Wang Siyu; Liu Shubin; An Qi; Ji Xiaolu

    2014-01-01

    The prototype of a time digitizing system for the BESⅢ endcap TOF (ETOF) upgrade is introduced in this paper. The ETOF readout electronics has a distributed architecture. Hit signals from the multi-gap resistive plate chamber (MRPC) are signaled as LVDS by front-end electronics (FEE) and are then sent to the back-end time digitizing system via long shield differential twisted pair cables. The ETOF digitizing system consists of two VME crates, each of which contains modules for time digitization, clock, trigger, fast control, etc. The time digitizing module (TDIG) of this prototype can support up to 72 electrical channels for hit information measurement. The fast control (FCTL) module can operate in barrel or endcap mode. The barrel FCTL fans out fast control signals from the trigger system to the endcap FCTLs, merges data from the endcaps and then transfers to the trigger system. Without modifying the barrel TOF (BTOF) structure, this time digitizing architecture benefits from improved ETOF performance without degrading the BTOF performance. Lab experiments show that the time resolution of this digitizing system can be lower than 20 ps, and the data throughput to the DAQ can be about 92 Mbps. Beam experiments show that the total time resolution can be lower than 45 ps. (authors)

  5. Upgrading the Fermilab fire and security reporting system

    International Nuclear Information System (INIS)

    King, C.; Neswold, R.

    2012-01-01

    Fermilab's home grown fire and security system (known as FIRUS - Fire Incident Reporting and Utility System) is highly reliable and has been used for nearly thirty years. The system has gone through some minor upgrades, however, none of those changes made significant, visible changes. In this paper, we present a major overhaul to the system that is halfway complete. We discuss the use of Apple's OS X for the new GUI (Graphical User Interface), upgrading the servers to use the Erlang programming language and allowing limited access for iOS and Android-based mobile devices. (authors)

  6. A compact, smart Langmuir Probe control module for MAST-Upgrade

    Science.gov (United States)

    Lovell, J.; Stephen, R.; Bray, S.; Naylor, G.; Elmore, S.; Willett, H.; Peterka, M.; Dimitrova, M.; Havranek, A.; Hron, M.; Sharples, R.

    2017-11-01

    A new control module for the MAST-Upgrade Langmuir Probe system has been developed. It is based on a Xilinx Zynq FPGA, which allows for excellent configurability and ease of retrieving data. The module is capable of arbitrary bias voltage waveform generation, and digitises current and voltage readings from 16 probes. The probes are biased and measured one at a time in a time multiplexed fashion, with the multiplexing sequence completely configurable. In addition, simultaneous digitisation of the floating potential of all unbiased probes is possible. A suite of these modules, each coupled with a high voltage amplifier, enables biasing and digitisation of 640 Langmuir Probes in the MAST-Upgrade Super-X divertor. The system has been successfully tested on the York Linear Plasma Device and on the COMPASS tokamak. It will be installed on MAST-Upgrade ready for operations in 2018.

  7. SYSTEM DESIGN AND PERFORMANCE FOR THE RECENT DIII-D NEUTRAL BEAM COMPUTER UPGRADE

    International Nuclear Information System (INIS)

    PHILLIPS, J.C; PENAFLOR, B.G; PHAM, N.Q; PIGLOWSKI, D.A.

    2004-03-01

    OAK-B135 This operating year marks an upgrade to the computer system charged with control and data acquisition for neutral beam injection system's heating at the DIII-D National Fusion Facility, funded by the US Department of Energy and operated by General Atomics (GA). This upgrade represents the third and latest major revision to a system which has been in service over twenty years. The first control and data acquisition computers were four 16 bit mini computers running a proprietary operating system. Each of the four controlled two ion source over dedicated CAMAC highway. In a 1995 upgrade, the system evolved to be two 32 bit Motorola mini-computers running a version of UNIX. Each computer controlled four ion sources with two CAMAC highways per CPU. This latest upgrade builds on this same logical organization, but makes significant advances in cost, maintainability, and the degree to which the system is open to future modification. The new control and data acquisition system is formed of two 2 GHz Intel Pentium 4 based PC's, running the LINUX operating system. Each PC drives two CAMAC serial highways using a combination of Kinetic Systems PCI standard CAMAC Hardware Drivers and a low-level software driver written in-house expressly for this device. This paper discusses the overall system design and implementation detail, describing actual operating experience for the initial six months of operation

  8. Real-time horizontal position control for Aditya-upgrade tokamak

    International Nuclear Information System (INIS)

    Kumar, Rohit; Ghosh, Joydeep; Tanna, Rakesh L.

    2015-01-01

    Position of plasma column is required to be controlled in real time for improved operation of any tokamak. A PID based system for real-time horizontal plasma position control has been designed for Aditya Upgrade tokamak. Modelling of transfer functions of actuators, plasma and diagnostic system are carried out for ADITYA-U tokamak. The PID controller is optimized using MATLAB-SIMULINK for horizontal position control. Further feed-forward loop is implemented where disturbance due to density variation is suppressed, which results in improved performance as compared to conventional PID operation. In this paper the detailed design of the whole system for real time control of plasma horizontal position in Aditya Upgrade tokamak is presented. (author)

  9. A demonstrated method for upgrading existing control room interiors

    International Nuclear Information System (INIS)

    Brice, R.M.; Terrill, D.; Brice, R.M.

    1991-01-01

    The main control room (MCR) of any nuclear power plant can justifiably be called the most important area staffed by personnel in the entire facility. The interior workstation configuration, equipment arrangement, and staff placement all affect the efficiency and habitability of the room. There are many guidelines available that describe various human factor principles to use when upgrading the environment of the MCR. These involve anthropometric standards and rules for placement of peripheral equipment. Due to the variations in plant design, however, hard-and-fast rules have not and cannot be standardized for retrofits in any significant way. How then does one develop criteria for the improvement of a MCR? The purpose of this paper is to discuss, from the designer's point of view, a method for the collection of information, development of criteria, and creation of a final design for a MCR upgrade. This method is best understood by describing the successful implementation at Tennessee Valley Authority's Sequoyah nuclear plant

  10. The LHCb RICH Upgrade: Development of the DCS and DAQ system.

    CERN Multimedia

    Cavallero, Giovanni

    2018-01-01

    The LHCb experiment is preparing for an upgrade during the second LHC long shutdown in 2019-2020. In order to fully exploit the LHC flavour physics potential with a five-fold increase in the instantaneous luminosity, a trigger-less readout will be implemented. The RICH detectors will require new photon detectors and a brand new front-end electronics. The status of the integration of the RICH photon detector modules with the MiniDAQ, the prototype of the upgraded LHCb readout architecture, has been reported. The development of the prototype of the RICH Upgrade Experiment Control System, integrating the DCS and DAQ partitions in a single FSM, has been described. The status of the development of the RICH Upgrade Inventory, Bookkeeping and Connectivity database has been reported as well.

  11. Review of the treat upgrade reactor scram system reliability analysis

    International Nuclear Information System (INIS)

    Montague, D.F.; Fussell, J.B.; Krois, P.A.; Morelock, T.C.; Knee, H.E.; Manning, J.J.; Haas, P.M.; West, K.W.

    1984-10-01

    In order to resolve some key LMFBR safety issues, ANL personnel are modifying the TREAT reactor to handle much larger experiments. As a result of these modifications, the upgraded Treat reactor will not always operate in a self-limited mode. During certain experiments in the upgraded TREAT reactor, it is possible that the fuel could be damaged by overheating if, once the computer systems fail, the reactor scram system (RSS) fails on demand. To help ensure that the upgraded TREAT reactor is shut down when required, ANL personnel have designed a triply redundant RSS for the facility. The RSS is designed to meet three reliability goals: (1) a loss of capability failure probability of 10 -9 /demand (independent failures only); (2) an inadvertent shutdown probability of 10 -3 /experiment; and (3) protection agaist any known potential common cause failures. According to ANL's reliability analysis of the RSS, this system substantially meets these goals

  12. Designing the upgrade of the Early Warning System in Slovenia

    International Nuclear Information System (INIS)

    Cindro, M.; Mitic, D.; Stritar, A.

    2004-01-01

    When designing an upgrade of early warning network for radiological emergencies one has to consider physical criteria as well as technical and financial possibilities, making the system the best possible compromise between the above mentioned aspects. In the case of the Slovenian Early Warning System (EWS) upgrade, the design was even harder because of the need to implement the existing measuring sites into the new scheme. We plan to add 35 new locations with external radiation and meteorology measurements to the 42 already existing sites. In the article we will describe the selection criteria for measuring sites and the requirements for the measuring equipment as well as a discussion of the physical quantities that need to be measured. In addition to gamma dose rate measurements, which are essential for radiological emergencies, meteorological measurements also provide vital information for the assessment of the situation. Especially we describe an additional necessary meteorological equipment which has to be installed. Today's communication technologies offer many possibilities for data transfer from the measuring site to the central data gathering unit and one has to choose the most appropriate one, primarily considering reliability but also cost effectiveness. For that reason new measuring sites will be at the locations already used for meteorological measurements by the Environmental Agency of the Republic of Slovenia. The Central Unit (CU) of such a network is the core of the system were all data have to be controlled, analysed and presented to the operator providing him with as much data as possible in a simple and clear fashion. (author)

  13. LHCb : Clock and timing distribution in the LHCb upgraded detector and readout system

    CERN Multimedia

    Alessio, Federico; Barros Marin, M; Cachemiche, JP; Hachon, F; Jacobsson, Richard; Wyllie, Ken

    2014-01-01

    The LHCb experiment is upgrading part of its detector and the entire readout system towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity and increase its trigger efficiency. In this paper, the new timing, trigger and control distribution system for such an upgrade is reviewed with particular attention given to the distribution of the clock and timing information across the entire readout system, up to the FE and the on-detector electronics. Current ideas are here presented in terms of reliability, jitter, complexity and implementation.

  14. Clock and timing distribution in the LHCb upgraded detector and readout system

    CERN Document Server

    Alessio, F; Barros Marin, M; Cachemiche, JP; Hachon, F; Jacobsson, R; Wyllie, K

    2015-01-01

    The LHCb experiment is upgrading part of its detector and the entire readout system towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity and increase its trigger efficiency. In this paper, the new timing, trigger and control distribution system for such an upgrade is reviewed with particular attention given to the distribution of the clock and timing information across the entire readout system, up to the FE and the on-detector electronics. Current ideas are here presented in terms of reliability, jitter, complexity and implementation.

  15. Experiences upgrading a fluoroscopic system to digital specifications

    International Nuclear Information System (INIS)

    Fox, T.; Fenzl, G.

    1995-01-01

    In 1993, an undertable fluoroscopic system was retrofitted with a Fluorospot HC digital system at the radiological clinic of the Knappschaftskrankenhaus in Puettlingen, Germany. The experiences and possibilities resulting from this digital upgrade are related by the authors, whose narrative is also accompanied by examples of clinical images. The costs involved are also discussed in this article. (orig.)

  16. Timing of Technology Upgrades: A Case of Enterprise Systems

    Science.gov (United States)

    Claybaugh, Craig C.

    2010-01-01

    Technology upgrades are an inevitable part of dealing with any man-made invention utilized for productive gain. One key technology used for productive gain within a firm is enterprise software, specifically a firm's Enterprise Resource Planning (ERP) system. After the adoption of an ERP system, an organization is perpetually faced with the…

  17. OPERATIONAL EXPERIENCE: UPGRADED MPC AND A SYSTEMS FOR THE RADIOCHEMICAL PLANT OF THE SIBERIAN CHEMICAL COMBINE

    International Nuclear Information System (INIS)

    RODRIGUEZ, C.; GOLOSKOKOV, I.; FISHBONE, L.; GOODEY, K.; LOOMIS, M.; CRAIN, B. JR.; LARSEN, R.

    2003-01-01

    The success of reducing the risk of nuclear proliferation through physical protection and material control/accounting systems depends upon the development of an effective design that includes consideration of the objectives of the systems and the resources available to implement the design. Included among the objectives of the design are facility characterization, definition of threat, and identification of targets. When considering resources, the designer must consider funds available, rapid low-cost elements, technology elements, human resources, and the availability of resources to sustain operation of the end system. The Siberian Chemical Combine (SCC) is a multi-function nuclear facility located in the Tomsk region of Siberia, Russia. Beginning in 1996, SCC joined with the United States Department of Energy (US/DOE) Material Protection, Control, and Accounting (MPC and A) Program to develop and implement MPC and A upgrades for the Radiochemical, Chemical Metallurgical, Conversion, Uranium Enrichment, and Reactor Plants of the SCC. At the Radiochemical Plant the MPC and A design and implementation process has been largely completed for the Plutonium Storage Facility and related areas of the Radiochemical Plant. Design and implementation of upgrades for the Radiochemical Plant include rapid physical protection upgrades such as bricking up of doors and windows, and installation of security-hardened doors. Rapid material control and accounting upgrades include installation of modern balances and bar code equipment. Comprehensive MPC and A upgrades include the installation of access controls to sensitive areas of the Plant, alarm communication and display (AC and D) systems to detect and annunciate alarm conditions, closed circuit (CCTV) systems to assess alarm conditions, central and secondary alarm station upgrades that enable security forces to assess and respond to alarm conditions, material control and accounting upgrades that include upgraded physical

  18. Search for Supersymmetric Top-Quark Partners Using Support Vector Machines and Upgrade of the Hadron Calorimeter Front-End Readout Control System at CMS

    CERN Document Server

    Sahin, Mehmet Ozgur; Schleper, Peter

    2017-01-01

    In this thesis a search for direct pair production of supersymmetric top-quark partners aswell as work on the upgrade of the front-end readout controller of the Hadron Calorimeter(HCAL) of the Compact Muon Solenoid (CMS) experiment are presented.The most appealing extension of the Standard Model (SM) is supersymmetry (SUSY), relating the integer spin (bosons) and half-integer spin elementary particles (fermions). Supersymmetric top-quark partners (t) around and below the TeV energy scale offer a solution to thehierarchy problem. Furthermore, R-parity conserving SUSY models propose a cold dark matter candidate in the form of stable lightest supersymmetric particles, e.g. lightest neutralinos(χ0 ).The analysis performed in this thesis is a search for top-squark pair production in a final state consisting of a single isolated lepton, jets, among which at least one is tagged asbottom-quark jet, and large missing transverse energy at the CMS experiment at the CERNLarge Hadron Collider (LHC) with 8 TeV center-of-...

  19. Performance characterization of the Micromegas detector for the New Small Wheel upgrade and Development and improvement of the Muon Spectrometer Detector Control System in the ATLAS experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00349891

    The ATLAS, an abbreviation for A Toroidal LHC ApparatuS, detector is one of the two general purpose high luminosity experiments (along with CMS) that have been built for probing p-p and Pb-Pb or p-Pb collisions in the LHC. The muon spectrometer encircles the rest of the ATLAS detector subsystems defining the ATLAS overall dimensions. Its principle of operation is based on the magnetic deflection of muon tracks by a system of superconducting air-core toroid magnets providing high resolution muon momentum measurement. The upgrade of the ATLAS muon spectrometer is primarily motivated by the high background radiation expected during Run-3 (2021) and ultimately at $\\mathcal{L}=7\\times 10^{34}\\,\\mathrm{cm^{-2}s^{-1}}$ in HL-LHC (2026). Owing to this the detectors that occupy the innermost muon station called Small Wheel (SW), MDT, CSC \\& TGC, will go beyond their design luminosity limit. In addition, the muon trigger rate will exceed the available bandwidth because of the fake endcap muon triggers ($90\\%$ is c...

  20. Physical Protection System Upgrades - Optimizing for Performance and Cost

    International Nuclear Information System (INIS)

    Hicks, Mary Jane; Bouchard, Ann M.

    1999-01-01

    CPA--Cost and Performance Analysis--is an architecture that supports analysis of physical protection systems and upgrade options. ASSESS (Analytic System and Software for Evaluating Security Systems), a tool for evaluating performance of physical protection systems, currently forms the cornerstone for evaluating detection probabilities and delay times of the system. Cost and performance data are offered to the decision-maker at the systems level and to technologists at the path-element level. A new optimization engine has been attached to the CPA methodology to automate analyses of many combinations (portfolios) of technologies. That engine controls a new analysis sequencer that automatically modifies ASSESS PPS files (facility descriptions), automatically invokes ASSESS Outsider analysis and then saves results for post-processing. Users can constrain the search to an upper bound on total cost, to a lower bound on level of performance, or to include specific technologies or technology types. This process has been applied to a set of technology development proposals to identify those portfolios that provide the most improvement in physical security for the lowest cost to install, operate and maintain at a baseline facility

  1. Feedback-controlled NTM stabilization on ASDEX Upgrade

    Directory of Open Access Journals (Sweden)

    Stober J.

    2015-01-01

    Full Text Available On ASDEX Upgrade a concept for real-time stabilization of NTMs has been realized and successfully applied to (3,2- and (2,1-NTMs. Since most of the work has meanwhile been published elsewhere, a short summary with the appropriate references is given. Limitations, deficits and future extensions of the system are discussed. In a second part the recent work on using modulated ECCD for NTM stabilisation is described in some detail. In these experiments ECCD power is modulated according to a magnetic footprint of the rotating NTM. In agreement with earlier results it could be shown that O-point heating reduces the necessary average power for stabilisation whereas X-point heating hampers stabilisation. Although this modulated scheme is not relevant for routine NTM stabilisation on ASDEX Upgrade it may be mandatory for ITER or DEMO. On ASDEX Upgrade it has been re-developed to demonstrate the usage of a FAst DIrectional Switch to continously heat the O-point of the rotating island with only one gyrotron switching between two launchers which target the mode at locations separated in phase by 180 degrees as described in [1].

  2. High resolution upgrade of the ATF damping ring BPM system

    International Nuclear Information System (INIS)

    Terunuma, N.; Urakawa, J.; Frisch, J.; May, J.; McCormick, D.; Nelson, J.; Seryi, A.; Smith, T.; Woodley, M.; Briegel, C.; Dysert, R.

    2008-01-01

    A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished in its first stage, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R and D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital downconversion techniques, digital signal processing, and also tests a new automatic gain error correction schema. The technical concept and realization, as well as preliminary results of beam studies are presented

  3. Operational present status and reliability analysis of the upgraded EAST cryogenic system

    Science.gov (United States)

    Zhou, Z. W.; Y Zhang, Q.; Lu, X. F.; Hu, L. B.; Zhu, P.

    2017-12-01

    Since the first commissioning in 2005, the cryogenic system for EAST (Experimental Advanced Superconducting Tokamak) has been cooled down and warmed up for thirteen experimental campaigns. In order to promote the refrigeration efficiencies and reliability, the EAST cryogenic system was upgraded gradually with new helium screw compressors and new dynamic gas bearing helium turbine expanders with eddy current brake to improve the original poor mechanical and operational performance from 2012 to 2015. Then the totally upgraded cryogenic system was put into operation in the eleventh cool-down experiment, and has been operated for the latest several experimental campaigns. The upgraded system has successfully coped with various normal operational modes during cool-down and 4.5 K steady-state operation under pulsed heat load from the tokamak as well as the abnormal fault modes including turbines protection stop. In this paper, the upgraded EAST cryogenic system including its functional analysis and new cryogenic control networks will be presented in detail. Also, its operational present status in the latest cool-down experiments will be presented and the system reliability will be analyzed, which shows a high reliability and low fault rate after upgrade. In the end, some future necessary work to meet the higher reliability requirement for future uninterrupted long-term experimental operation will also be proposed.

  4. UP-GRADED RHIC INJECTION SYSTEM.

    Energy Technology Data Exchange (ETDEWEB)

    HAHN,H.FISCHER,W.SEMERTZIDIS,Y.K.WARBURTON,D.S.

    2003-05-12

    The design of the RHIC injection systems anticipated the possibility of filling and operating the rings with a 120 bunch pattern, corresponding to 110 bunches after allowing for the abort gap. Beam measurements during the 2002 run confirmed the possibility, although at the expense of severe transverse emittance growth and thus not on an operational basis. An improvement program was initiated with the goal of reducing the kicker rise time from 110 to {approx}95 ns and of minimizing pulse timing jitter and drift. The major components of the injection system are 4 kicker magnets and Blmlein pulsers using thyratron switches. The kicker terminating resistor and operating voltage was increased to reduce the rise time. Timing has been stabilized by using commercial trigger units and extremely stable dc supplies for the thyratron reservoir. A fiber optical connection between control room and the thyratron trigger unit has been provided, thereby allowing the operator to adjust timing individually for each kicker unit. The changes were successfully implemented for use in the RHIC operation.

  5. Analysis of Reactor Pressurized Thermal Shock Conditions Considering Upgrading of Systems Important to Safety

    International Nuclear Information System (INIS)

    Mazurok, A.S; Vyshemirskyij, M.P.

    2015-01-01

    The paper analyzes conditions of pressurized thermal shock on the reactor pressure vessel taking into account upgrading of the emergency core cooling system and primary overpressure protection system. For representative accident scenarios, calculation and comparative analysis was carried out. These scenarios include a small leak from the hot leg and PRZ SV stuck opening with re closure after 3600 sec and 3 SG heat transfer tube rupture. The efficiency of mass flow control by valves on the pump head (emergency core cooling systems) and cold overpressure protection (primary overpressure protection system) was analyzed. The thermal hydraulic model for RELAP5/Mod3.2 code with detailed downcomer (DC) model and changes in accordance with upgrades was used for calculations. Detailed (realistic) modeling of piping and equipment was performed. The upgrades prevent excessive primary cooling and, consequently, help to preserve the RPV integrity and to avoid the formation of a through crack, which can lead to a severe accident

  6. ASDEX Upgrade Discharge Control System—A real-time plasma control framework

    International Nuclear Information System (INIS)

    Treutterer, W.; Cole, R.; Lüddecke, K.; Neu, G.; Rapson, C.; Raupp, G.; Zasche, D.; Zehetbauer, T.

    2014-01-01

    Highlights: • The ASDEX Upgrade Discharge Control System (DCS) is a comprehensive control system to conduct fusion experiments. • DCS supports real-time diagnostic integration, adaptable feedback schemes, actuator management and exception handling. • DCS offers workflow management, logging and archiving, self-monitoring and inter-process communication. • DCS is based on a distributed, modular software framework architecture designed for real-time operation. • DCS is composed of re-usable generic but highly customisable components. - Abstract: ASDEX Upgrade is a fusion experiment with a size and complexity to allow extrapolation of technical and physical conditions and requirements to devices like ITER and even beyond. In addressing advanced physics topics it makes extensive use of sophisticated real-time control methods. It comprises real-time diagnostic integration, dynamically adaptable multivariable feedback schemes, actuator management including load distribution schemes and a powerful monitoring and pulse supervision concept based on segment scheduling and exception handling. The Discharge Control System (DCS) supplies all this functionality on base of a modular software framework architecture designed for real-time operation. It provides system-wide services like workflow management, logging and archiving, self-monitoring and inter-process communication on Linux, VxWorks and Solaris operating systems. By default DCS supports distributed computing, and a communication layer allows multi-directional signal transfer and data-driven process synchronisation over shared memory as well as over a number of real-time networks. The entire system is built following the same common design concept combining a rich set of re-usable generic but highly customisable components with a configuration-driven component deployment method. We will give an overview on the architectural concepts as well as on the outstanding capabilities of DCS in the domains of inter

  7. ASDEX Upgrade Discharge Control System—A real-time plasma control framework

    Energy Technology Data Exchange (ETDEWEB)

    Treutterer, W., E-mail: Wolfgang.Treutterer@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstraße 2, 85748 Garching (Germany); Cole, R.; Lüddecke, K. [Unlimited Computer Systems GmbH, Iffeldorf (Germany); Neu, G.; Rapson, C.; Raupp, G.; Zasche, D.; Zehetbauer, T. [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstraße 2, 85748 Garching (Germany)

    2014-03-15

    Highlights: • The ASDEX Upgrade Discharge Control System (DCS) is a comprehensive control system to conduct fusion experiments. • DCS supports real-time diagnostic integration, adaptable feedback schemes, actuator management and exception handling. • DCS offers workflow management, logging and archiving, self-monitoring and inter-process communication. • DCS is based on a distributed, modular software framework architecture designed for real-time operation. • DCS is composed of re-usable generic but highly customisable components. - Abstract: ASDEX Upgrade is a fusion experiment with a size and complexity to allow extrapolation of technical and physical conditions and requirements to devices like ITER and even beyond. In addressing advanced physics topics it makes extensive use of sophisticated real-time control methods. It comprises real-time diagnostic integration, dynamically adaptable multivariable feedback schemes, actuator management including load distribution schemes and a powerful monitoring and pulse supervision concept based on segment scheduling and exception handling. The Discharge Control System (DCS) supplies all this functionality on base of a modular software framework architecture designed for real-time operation. It provides system-wide services like workflow management, logging and archiving, self-monitoring and inter-process communication on Linux, VxWorks and Solaris operating systems. By default DCS supports distributed computing, and a communication layer allows multi-directional signal transfer and data-driven process synchronisation over shared memory as well as over a number of real-time networks. The entire system is built following the same common design concept combining a rich set of re-usable generic but highly customisable components with a configuration-driven component deployment method. We will give an overview on the architectural concepts as well as on the outstanding capabilities of DCS in the domains of inter

  8. Upgraded data service system for HT-7 tokamak

    International Nuclear Information System (INIS)

    Qu Lianzheng; Luo Jiarong; Wei Peijie; Li Guiming; Cheng Ting; Qi Na

    2005-01-01

    A data service system plays an indispensable role in HT-7 Tokamak experiment. Since the former system doesn't provide the function of timely data procession and analysis, and all client software are based on Windows, it can't fulfill virtual fusion laboratory for remote researchers. Therefore, a new system which is simplified by three kinds of data servers and one data analysis and visualization software tool has been developed. The data servers include a data acquisition server based on file system, an MDSplus server used as the central repository for analysis data, and a web server. Users who prefer the convenience of application that can be run in a Web Browser can easily access the experiment data without knowing X-Windows. In order to adjust instruments to control experiment the operators need to plot data duly as soon as they are gathered. To satisfy their requirement, an upgraded data analysis and visualization software GT-7 is developed. It not only makes 2D data visualization more efficient, but also it can be capable of processing, analyzing and displaying interactive 2D and 3D graph of raw, analyzed data by the format of ASCII, LZO and MDSplus. (authors)

  9. Digital I and C system upgrade integration technique

    International Nuclear Information System (INIS)

    Huang, H. W.; Shih, C.; Wang, J. R.; Huang, K. C.

    2012-01-01

    This work developed an integration technique for digital I and C system upgrade, the utility can replace the I and C systems step by step systematically by this method. Inst. of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin-Shan (CS) NPP, Kuo-Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) Procedure. The digital I and C replacement integration technique includes: (I) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR- 1011710 (2005) 'Handbook for Evaluating Critical Digital Equipment and Systems' which was published by the Electric Power Research Inst. (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SVandV), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. A

  10. Digital I and C system upgrade integration technique

    Energy Technology Data Exchange (ETDEWEB)

    Huang, H. W. [Inst. of Nuclear Energy Research (INER), No. 1000, Wenhua Road, Chiaan Village, Longtan Township, Taoyuan County, 32546, Taiwan (China); Shih, C. [Inst. of Nuclear Engineering and Science, National Tsing Hua Univ., 101, Sec. 2, Kuang Fu Rd, Hsinchu, Taiwan (China); Wang, J. R. [Inst. of Nuclear Energy Research (INER), No. 1000, Wenhua Road, Chiaan Village, Longtan Township, Taoyuan County, 32546, Taiwan (China); Huang, K. C. [Inst. of Nuclear Engineering and Science, National Tsing Hua Univ., 101, Sec. 2, Kuang Fu Rd, Hsinchu, Taiwan (China)

    2012-07-01

    This work developed an integration technique for digital I and C system upgrade, the utility can replace the I and C systems step by step systematically by this method. Inst. of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin-Shan (CS) NPP, Kuo-Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) Procedure. The digital I and C replacement integration technique includes: (I) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR- 1011710 (2005) 'Handbook for Evaluating Critical Digital Equipment and Systems' which was published by the Electric Power Research Inst. (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SVandV), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure

  11. Real-time signal communication between diagnostic and control in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Treutterer, Wolfgang; Neu, Gregor; Raupp, Gerhard; Zehetbauer, Thomas; Zasche, Dieter; Lueddecke, Klaus; Cole, Richard

    2010-01-01

    The ASDEX Upgrade tokamak experiment is equipped with a versatile discharge monitoring and control system. It allows to develop and use advanced control algorithms to investigate plasma physics under well-defined conditions with the objective of optimising plasma performance. The achievable quality depends on the accuracy with which the plasma state can be reconstructed from measurements under real-time conditions. Today's advanced algorithms need physics quantities - scalar entities as well as profiles. These are obtained processing huge numbers of raw measurements with complex diagnostic algorithms. Adequate network communication for the resulting signals is crucial to satisfy real-time requirements, especially when several diagnostic systems cooperate in a feedback control loop. Support for the technology of choice, however, is not easily available for all of the diverse, highly specialised diagnostic systems. We give an overview about the methods that have been explored at ASDEX Upgrade for real-time signal transfer. In particular, we investigated reflective shared memory and Ethernet technologies. Our solution strives to combine their strengths. For fast communication on dedicated computing nodes, reflective shared memory is used. For the majority of diagnostic systems producing large data blocks at moderate rates, Ethernet connections with UDP protocol are employed. Following ASDEX Upgrade's framework concept, a software layer hides the networks used from both diagnostic and control applications.

  12. Real-time signal communication between diagnostic and control in ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Treutterer, Wolfgang, E-mail: Wolfgang.Treutterer@ipp.mpg.d [Max-Planck Institut fuer Plasmaphysik, Garching, EURATOM Association (Germany); Neu, Gregor; Raupp, Gerhard; Zehetbauer, Thomas; Zasche, Dieter [Max-Planck Institut fuer Plasmaphysik, Garching, EURATOM Association (Germany); Lueddecke, Klaus; Cole, Richard [Unlimited Computer Systems, Iffeldorf (Germany)

    2010-07-15

    The ASDEX Upgrade tokamak experiment is equipped with a versatile discharge monitoring and control system. It allows to develop and use advanced control algorithms to investigate plasma physics under well-defined conditions with the objective of optimising plasma performance. The achievable quality depends on the accuracy with which the plasma state can be reconstructed from measurements under real-time conditions. Today's advanced algorithms need physics quantities - scalar entities as well as profiles. These are obtained processing huge numbers of raw measurements with complex diagnostic algorithms. Adequate network communication for the resulting signals is crucial to satisfy real-time requirements, especially when several diagnostic systems cooperate in a feedback control loop. Support for the technology of choice, however, is not easily available for all of the diverse, highly specialised diagnostic systems. We give an overview about the methods that have been explored at ASDEX Upgrade for real-time signal transfer. In particular, we investigated reflective shared memory and Ethernet technologies. Our solution strives to combine their strengths. For fast communication on dedicated computing nodes, reflective shared memory is used. For the majority of diagnostic systems producing large data blocks at moderate rates, Ethernet connections with UDP protocol are employed. Following ASDEX Upgrade's framework concept, a software layer hides the networks used from both diagnostic and control applications.

  13. The magnet system of the Tokamak T-15 upgrade

    International Nuclear Information System (INIS)

    Khvostenko, P.P.; Azizov, E.A.; Alfimov, D.E.; Belyakov, V.A.; Bondarchuk, E.N.; Chudnovsky, A.N.; Dokuka, V.N.; Kavin, A.A.; Khayrutdinov, R.R.; Khokhlov, M.V.; Kitaev, B.A.; Krasnov, S.V.; Maximova, I.I.; Labusov, A.N.; Lukash, V.E.; Mineev, A.B.; Muratov, V.P.

    2015-01-01

    Highlights: • T-15U project is the initial technical base for creating fusion neutron sources. • Magnet system of T-15U will confine the hot plasma in the divertor configuration. • Toroidal magnetic field at the plasma axis is 2 T. • T-15U should begin operations in 2016. - Abstract: Presently, the Tokamak T-15 is being upgraded. The magnet system of the Tokamak T-15 upgrade will obtain and confine the hot plasma in the divertor configuration. Plasma parameters are a major radius of 1.48 m, a minor radius of 0.67 m, an elongation of 1.7–1.9 and a triangularity of 0.3–0.4. The magnet system includes the toroidal winding and the poloidal magnet system. The poloidal magnet system generates the divertor with single null and double null magnetic configurations. The power supply system provides the necessary current scenarios in the windings of the magnet system. All elements of the magnet system will be manufactured by the end of 2015. The Tokamak T-15 upgrade should begin operations in 2016.

  14. The magnet system of the Tokamak T-15 upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Khvostenko, P.P., E-mail: ppkhvost@rambler.ru [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Azizov, E.A.; Alfimov, D.E. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Belyakov, V.A.; Bondarchuk, E.N. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); Chudnovsky, A.N.; Dokuka, V.N. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Kavin, A.A. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); Khayrutdinov, R.R. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Khokhlov, M.V.; Kitaev, B.A.; Krasnov, S.V.; Maximova, I.I.; Labusov, A.N. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); Lukash, V.E. [National Research Centre ‘Kurchatov Institute’, Institute of Tokamak Physics, Kurchatov sq. 1, 123182 Moscow (Russian Federation); Mineev, A.B.; Muratov, V.P. [Joint Stock Company “D.V. Efremov Institute of Electrophysical Apparatus”, Metallostroy, 196641 St. Petersburg (Russian Federation); and others

    2015-10-15

    Highlights: • T-15U project is the initial technical base for creating fusion neutron sources. • Magnet system of T-15U will confine the hot plasma in the divertor configuration. • Toroidal magnetic field at the plasma axis is 2 T. • T-15U should begin operations in 2016. - Abstract: Presently, the Tokamak T-15 is being upgraded. The magnet system of the Tokamak T-15 upgrade will obtain and confine the hot plasma in the divertor configuration. Plasma parameters are a major radius of 1.48 m, a minor radius of 0.67 m, an elongation of 1.7–1.9 and a triangularity of 0.3–0.4. The magnet system includes the toroidal winding and the poloidal magnet system. The poloidal magnet system generates the divertor with single null and double null magnetic configurations. The power supply system provides the necessary current scenarios in the windings of the magnet system. All elements of the magnet system will be manufactured by the end of 2015. The Tokamak T-15 upgrade should begin operations in 2016.

  15. Belle DAQ system upgrade at 2001

    CERN Document Server

    Suzuki, S Y; Kim, H W; Kim, H J; Kim, H O; Nakao, M; Won, E; Yamauchi, M

    2002-01-01

    We renewed the data acquisition system for the Belle experiment. Previous data acquisition system, which has been used since December 1998, did not have level 2 trigger facility. To improve the data reduction factor and total throughput, we replaced event builder, online computer farm and the storage system. The event builder and online computer farm are unified into one system. This event building farm uses commodity hardware and newly appended level 2 trigger functionality. This data acquisition system started its operation since last autumn and is very stable. We took 36 fb sup - sup 1 with new DAQ system, it had already overtaken 30 fb sup - sup 1 that is total amount of previous DAQ system.

  16. Commissioning of inline ECE system within waveguide based ECRH transmission systems on ASDEX upgrade

    Directory of Open Access Journals (Sweden)

    Donné A.J.H.

    2012-09-01

    Full Text Available A CW capable inline electron cyclotron emission (ECE separation system for feedback control, featuring oversized corrugated waveguides, is commissioned on ASDEX upgrade (AUG. The system is based on a combination of a polarization independent, non-resonant, Mach-Zehnder diplexer equipped with dielectric plate beam splitters [2, 3] employed as corrugated oversized waveguide filter, and a resonant Fast Directional Switch, FADIS [4, 5, 6, 7] as ECE/ECCD separation system. This paper presents an overview of the system, the low power characterisation tests and first high power commissioning on AUG.

  17. Commissioning of inline ECE system within waveguide based ECRH transmission systems on ASDEX upgrade

    Science.gov (United States)

    Bongers, W. A.; Kasparek, W.; Doelman, N.; van den Braber, R.; van den Brand, H.; Meo, F.; de Baar, M. R.; Amerongen, F. J.; Donné, A. J. H.; Elzendoorn, B. S. Q.; Erckmann, V.; Goede, A. P. H.; Giannone, L.; Grünwald, G.; Hollman, F.; Kaas, G.; Krijger, B.; Michel, G.; Lubyako, L.; Monaco, F.; Noke, F.; Petelin, M.; Plaum, B.; Purps, F.; ten Pierik, J. G. W.; Schüller, C.; Slob, J. W.; Stober, J. K.; Schütz, H.; Wagner, D.; Westerhof, E.; Ronden, D. M. S.

    2012-09-01

    A CW capable inline electron cyclotron emission (ECE) separation system for feedback control, featuring oversized corrugated waveguides, is commissioned on ASDEX upgrade (AUG). The system is based on a combination of a polarization independent, non-resonant, Mach-Zehnder diplexer equipped with dielectric plate beam splitters [2, 3] employed as corrugated oversized waveguide filter, and a resonant Fast Directional Switch, FADIS [4, 5, 6, 7] as ECE/ECCD separation system. This paper presents an overview of the system, the low power characterisation tests and first high power commissioning on AUG.

  18. EBR-II Cover Gas Cleanup System (CGCS) upgrade graphical interface design

    International Nuclear Information System (INIS)

    Staffon, J.D.; Peters, G.G.

    1992-01-01

    Technology advances in the past few years have prompted an effort at Argonne National Laboratory to replace existing equipment with high performance digital computers and color graphic displays. Improved operation of process systems can be achieved by utilizing state-of-the-art computer technology in the areas of process control and process monitoring. The Cover Gas Cleanup System (CGCS) at EBR-II is the first system to be upgraded with high performance digital equipment. The upgrade consisted of a main control computer, a distributed control computer, a front end input/output computer, a main graphics interface terminal, and a remote graphics interface terminal. This paper describes the main control computer and the operator interface control software

  19. Customization and Upgrade of ERP systems

    DEFF Research Database (Denmark)

    Dittrich, Yvonne; Vaucouleur, Sebastien

    An increasing number of software systems are developed by customizing a standard product that provides the major part of the functionality. The customizations of Enterprise  Resource Planning systems are examples of such a practice. Nonetheless, little empirical research on the specific...... characteristic of this kind of software development is available. Do the recommendations for “normal” software development also apply in this case? We present an empirical study on ERP customization practices based on video recordings, interviews and a survey. The observed and reported practices challenge some...

  20. Amplitude based feedback control for NTM stabilisation at ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Rapson, Christopher, E-mail: chris.rapson@ipp.mpg.de; Giannone, Louis; Maraschek, Marc; Reich, Matthias; Stober, Joerg; Treutterer, Wolfgang

    2014-05-15

    Highlights: • Two algorithms have been developed which use the NTM amplitude to control ECCD deposition and stabilise NTMs. • Both algorithms were tested and tuned in a simulation of the full feedback loop including an MRE. • Both algorithms have been successfully deployed in ASDEX Upgrade experiments. • Use of the NTM amplitude adds considerable robustness, which is necessary when trying to target ECCD to within 1 cm of the island location. • This is part of ongoing work to reliably and quickly stabilise NTMs in any plasma scenario. - Abstract: Neoclassical Tearing Modes (NTMs) degrade the confinement in tokamak plasmas at high beta, placing a major limitation on the projected fusion performance. Furthermore, NTMs can lead to disruptions with even more severe consequences. Therefore methods to stabilise NTMs are being developed with high priority at several research institutes worldwide. The favoured method is to deposit Electron Cyclotron Current Drive (ECCD) precisely at the mode location by controlling a movable mirror in the ECCD launcher. This method requires both the mode location and the deposition location to be known with high accuracy in real time. The required accuracy is given by half of the marginal island width, or approximately 1 cm for a m/n = 3/2 NTM at ASDEX Upgrade. Despite considerable development on a range of diagnostics, it remains challenging to provide the necessary accuracy reliably and in real time. To relax the accuracy requirements and add robustness, the feedback controller can additionally consider the effect of ECCD on the NTM amplitude directly. Then the optimal deposition location is simply where the NTM amplitude is minimised. The simplest implementation sweeps the ECCD beam across the expected NTM location. After the sweep, the beam can be returned to the optimal location and held there to stabilise the NTM. Unfortunately, waiting for a full sweep takes too long. Therefore a second method assesses the NTM growth every

  1. Detector and System Developments for LHC Detector Upgrades

    CERN Document Server

    Mandelli, Beatrice; Guida, Roberto; Rohne, Ole; Stapnes, Steinar

    2015-05-12

    The future Large Hadron Collider (LHC) Physics program and the consequent improvement of the LHC accelerator performance set important challenges to all detector systems. This PhD thesis delineates the studies and strategies adopted to improve two different types of detectors: the replacement of precision trackers with ever increasingly performing silicon detectors, and the improvement of large gaseous detector systems by optimizing their gas mixtures and operation modes. Within the LHC tracker upgrade programs, the ATLAS Insertable B-layer (IBL) is the first major upgrade of a silicon-pixel detector. Indeed the overall ATLAS Pixel Detector performance is expected to degrade with the increase of luminosity and the IBL will recover the performance by adding a fourth innermost layer. The IBL Detector makes use of new pixel and front-end electronics technologies as well as a novel thermal management approach and light support and service structures. These innovations required complex developments and Quality Ass...

  2. Plant process computer system upgrades at the KSG simulator centre

    International Nuclear Information System (INIS)

    2006-01-01

    The human-machine interface (HMI) of a modern plant process computer system (PPC) differs significantly from that of older systems. Along with HMI changes, there are often improvements to system functionality such as alarm display and printing functions and transient data analysis capabilities. Therefore, the upgrade or replacement of a PPC in the reference plant will typically require an upgrade of the simulator (see Section 6.5.1 for additional information). Several options are available for this type of project including stimulation of a replica system,or emulation, or simulation of PPC functionality within the simulation environment. To simulate or emulate a PCC, detailed knowledge of hardware and software functionality is required. This is typically vendor proprietary information, which leads to licensing and other complications. One of the added benefits of stimulating the PPC system is that the simulator can be used as a test bed for functional testing (i.e. verification and validation) of the system prior to installation in the reference plant. Some of this testing may include validation of the process curve and system diagram displays. Over the past few years several German NPPs decided to modernize their plant process computer (PPC) systems. After the NPPs had selected the desired system to meet their requirements the question arose how to modernize the PPC systems on the corresponding simulators. Six German NPPs selected the same PPC system from the same vendor and it was desired to perform integral tests of the HMI on the simulators. In this case the vendor offered a stimulated variant of their system and it therefore made sense to choose that implementation method for upgrade of the corresponding simulators. The first simulator PPC modernization project can be considered as a prototype project for the follow-on projects. In general, from the simulator project execution perspective the implementation of several stimulated PPC systems of the same type

  3. Use of 2.5-D and 3-D technology to evaluate control room upgrades

    International Nuclear Information System (INIS)

    Hanes, L. F.; Naser, J.

    2006-01-01

    This paper describes an Electric Power Research Inst. (EPRI) study in which 2.5-D and 3-D visualization technology was applied to evaluate the design of a nuclear power plant control room upgrade. The study involved converting 3-D CAD flies of a planned upgrade into a photo-realistic appearing virtual model, and evaluating the value and usefulness of the model. Nuclear utility and EPRI evaluators viewed and interacted with the control room virtual model with both 2.5-D and 3-D representations. They identified how control room and similar virtual models may be used by utilities for design and evaluation purposes; assessed potential economic and other benefits; and identified limitations, potential problems, and other issues regarding use of visualization technology for this and similar applications. In addition, the Halden CREATE (Control Room Engineering Advanced Tool-kit Environment) Verification Tool was applied to evaluate features of the virtual model against US NRC NUREG 0700 Revision 2 human factors engineering guidelines (NUREG 0700) [1]. The study results are very favorable for applying 2.5-D visualization technology to support upgrading nuclear power plant control rooms and other plant facilities. Results, however, show that today's 3-D immersive viewing systems are difficult to justify based on cost, availability and value of information provided for this application. (authors)

  4. He Puff System For Dust Detector Upgrade

    International Nuclear Information System (INIS)

    Rais, B.; Skinner, C.H.; Roquemore, A.L.

    2010-01-01

    Local detection of surface dust is needed for the safe operation of next-step magnetic fusion devices such as ITER. An electrostatic dust detector, based on a 5 cm x 5 cm grid of interlocking circuit traces biased to 50 V, has been developed to detect dust on remote surfaces and was successfully tested for the first time on the National Spherical Torus Experiment (NSTX). We report on a helium puff system that clears residual dust from this detector and any incident debris or fibers that might cause a permanent short circuit. The entire surface of the detector was cleared of carbon particles by two consecutive helium puffs delivered by three nozzles of 0.45 mm inside diameter. The optimal configuration was found to be with the nozzles at an angle of 30o with respect to the surface of the detector and a helium backing pressure of 6 bar.

  5. Human-machine interface (HMI) report for 241-SY-101 data acquisition system (DACS) upgrade study

    International Nuclear Information System (INIS)

    Truitt, R.W.

    1997-01-01

    This report provides an independent evaluation of information for a Windows based Human Machine Interface (HMI) to replace the existing DOS based Iconics HMI currently used in the Data Acquisition and Control System (DACS) used at Tank 241-SY-101. A fundamental reason for this evaluation is because of the difficulty of maintaining the system with obsolete, unsupported software. The DACS uses a software operator interface (Genesis for DOS HMI) that is no longer supported by its manufacturer, Iconics. In addition to its obsolescence, it is complex and difficult to train additional personnel on. The FY 1997 budget allocated $40K for phase 1 of a software/hardware upgrade that would have allowed the old DOS based system to be replaced by a current Windows based system. Unfortunately, budget constraints during FY 1997 has prompted deferral of the upgrade. The upgrade needs to be performed at the earliest possible time, before other failures render the system useless. Once completed, the upgrade could alleviate other concerns: spare pump software may be able to be incorporated into the same software as the existing pump, thereby eliminating the parallel path dilemma; and the newer, less complex software should expedite training of future personnel, and in the process, require that less technical time be required to maintain the system

  6. Feasibility study of the university of Utah TRIGA reactor power upgrade - Part I: Neutronics-based study in respect to control rod system requirements and design

    Directory of Open Access Journals (Sweden)

    Ćutić Avdo

    2013-01-01

    Full Text Available We present a summary of extensive studies in determining the highest achievable power level of the current University of Utah TRIGA core configuration in respect to control rod requirements. Although the currently licensed University of Utah TRIGA power of 100 kW provides an excellent setting for a wide range of experiments, we investigate the possibility of increasing the power with the existing fuel elements and core structure. Thus, we have developed numerical models in combination with experimental procedures so as to assess the potential maximum University of Utah TRIGA power with the currently available control rod system and have created feasibility studies for assessing new core configurations that could provide higher core power levels. For the maximum determined power of a new University of Utah TRIGA core arrangement, a new control rod system was proposed.

  7. A computer model for identifying security system upgrades

    International Nuclear Information System (INIS)

    Lamont, A.

    1988-01-01

    This paper describes a prototype safeguards analysis tool that automatically identifies system weaknesses against an insider adversary and suggest possible upgrades to improve the probability that the adversary will be detected. The tool is based on this premise: as the adversary acts, he or she creates a set of facts that can be detected by safeguards components. Whenever an adversary's planned set of actions create a set of facts which the security personnel would consider irregular or unusual, we can improve the security system by implementing safeguards that detect those facts. Therefore, an intelligent computer program can suggest upgrades to the facility if we construct a knowledge base that contains information about: (1) the facts created by each possible adversary action, (2) the facts that each possible safeguard can detect, and (3) groups of facts which will be considered irregular whenever they occur together. The authors describe the structure of the knowledge base and show how the above information can be represented in it. They also describe the procedures that a computer program can use to identify missing or weak safeguards and to suggest upgrades

  8. FASTBUS readout system for the CDF DAQ upgrade

    International Nuclear Information System (INIS)

    Andresen, J.; Areti, H.; Black, D.

    1993-11-01

    The Data Acquisition System (DAQ) at the Collider Detector at Fermilab is currently being upgraded to handle a minimum of 100 events/sec for an aggregate bandwidth that is at least 25 Mbytes/sec. The DAQ System is based on a commercial switching network that has interfaces to VME bus. The modules that readout the front end crates (FASTBUS and RABBIT) have to deliver the data to the VME bus based host adapters of the switch. This paper describes a readout system that has the required bandwidth while keeping the experiment dead time due to the readout to a minimum

  9. CMS Forward Pixel Upgrade Electronics and System Testing

    CERN Document Server

    Weber, Hannsjorg Artur

    2016-01-01

    This note discusses results of electronics and system testing of the CMS forward pixel (FPIX) detector upgrade for Phase 1. The FPIX detector is comprised of four stand-alone half cylinders, each of which contains frontend readout electronic boards, power regulators, cables and fibers in addition to the pixel modules. All of the components undergo rigorous testing and quality assurance before assembly into the half cylinders. Afterwards, we perform full system tests on the completely assembled half cylinders, including calibrations at final operating temperatures, characterization of the realistic readout chain, and system grounding and noise studies. The results from all these tests are discussed.

  10. Heavy water upgrading system in the Fugen heavy water reactor

    International Nuclear Information System (INIS)

    Matsushita, T.; Susaki, S.

    1980-01-01

    The heavy water upgrading system, which is installed in the Fugen heavy water reactor (HWR) was designed to reuse degraded heavy water generated from the deuteration-dedeuteration of resin in the ion exchange column of the moderator purification system. The electrolysis method has been applied in this system on the basis of the predicted generation rate and concentration of degraded heavy water. The structural feature of the electrolytic cell is that it consists of dual cylindrical electrodes, instead of a diaphragm as in the case of conventional water electrolysis. 2 refs

  11. Experiences in controlling the upgrading of TRIGA 2000 Bandung reactor

    International Nuclear Information System (INIS)

    Huda, K.; Wibowo, Y.W.; Suprawhardana, M.S.

    2001-01-01

    TRIGA 2000 Bandung Reactor was established in 1961 for research, education and isotope production purposes. The reactor reached its first criticality in October 1964 and operated at nominal power of 250 kW until 1971. In 1971 the reactor was upgraded to the power level of 1000 kW. In order to raise the capacity of isotope production, the reactor has been upgraded again to the power level of 2000 kW. During the modification of the reactor, the Center for Research and Development of Nuclear Techniques (CRDNT) was management of the reactor as it faced many problems, either technical or non-technical ones. This caused the upgrading activities to take a long time. At this time, the reactor upgrading has almost finished, and the nuclear commissioning is going on. Several aspects and problems associated with the upgrading process have been reviewed and the results are discussed in the present paper. (author)

  12. Upgrade of the Gas Flow Control System of the Resistive Current Leads of the LHC Inner Triplet Magnets: Simulation and Experimental Validation

    CERN Document Server

    Perin, A; Casas-Cubillos, J; Pezzetti, M

    2014-01-01

    The 600 A and 120 A circuits of the inner triplet magnets of the Large Hadron Collider are powered by resistive gas cooled current leads. The current solution for controlling the gas flow of these leads has shown severe operability limitations. In order to allow a more precise and more reliable control of the cooling gas flow, new flowmeters will be installed during the first long shutdown of the LHC. Because of the high level of radiation in the area next to the current leads, the flowmeters will be installed in shielded areas located up to 50 m away from the current leads. The control valves being located next to the current leads, this configuration leads to long piping between the valves and the flowmeters. In order to determine its dynamic behaviour, the proposed system was simulated with a numerical model and validated with experimental measurements performed on a dedicated test bench.

  13. Upgrade of the gas flow control system of the resistive current leads of the LHC inner triplet magnets: Simulation and experimental validation

    Energy Technology Data Exchange (ETDEWEB)

    Perin, A.; Casas-Cubillos, J.; Pezzetti, M. [CERN, CH-1211 Geneva 23 (Switzerland); Almeida, M. [Universidade Federal de Minas Gerais, 31270-901 Belo Horizonte (Brazil)

    2014-01-29

    The 600 A and 120 A circuits of the inner triplet magnets of the Large Hadron Collider are powered by resistive gas cooled current leads. The current solution for controlling the gas flow of these leads has shown severe operability limitations. In order to allow a more precise and more reliable control of the cooling gas flow, new flowmeters will be installed during the first long shutdown of the LHC. Because of the high level of radiation in the area next to the current leads, the flowmeters will be installed in shielded areas located up to 50 m away from the current leads. The control valves being located next to the current leads, this configuration leads to long piping between the valves and the flowmeters. In order to determine its dynamic behaviour, the proposed system was simulated with a numerical model and validated with experimental measurements performed on a dedicated test bench.

  14. Gas system Upgrade for the BaBar IFR Detector at SLAC

    International Nuclear Information System (INIS)

    Foulkes, S

    2004-01-01

    A new gas distribution and monitoring system was installed as part of an upgrade of the forward endcap muon detection system (IFR) of the BaBar detector at SLAC. Over 300 gas circuits are controlled and monitored. The return gas flow is monitored by digital bubblers which use photo-gate electronics to count the bubbling rate. The rates are monitored in real time and recorded in a history database allowing studies of flow rate versus chamber performance

  15. The ASDEX Upgrade ICRF system: Operational experience and developments

    International Nuclear Information System (INIS)

    Faugel, H.; Angene, P.; Becker, W.; Braun, F.; Bobkov, Vl.V.; Eckert, B.; Fischer, F.; Hartmann, D.A.; Heilmaier, G.; Kneidl, J.; Noterdaeme, J.-M.; Siegl, G.; Wuersching, E.

    2005-01-01

    The ICRF system at the ASDEX Upgrade tokamak is in operation since May 1992. Following some modifications of which the major one was the installation of 3 dB couplers it has become a reliable additional heating system. The maximum power coupled into the plasma has been raised up to 7.2 MW (90% of the installed RF power) for short pulses and up to 6.2 MW for pulses several second long with energy of up to 29 MJ. A power of 5 MW is delivered on a regular basis to replace two NBI sources

  16. LHCb: Beam and Background Monitoring and the Upgrade of the Timing and Fast Control System of the LHCb experiment at CERN

    CERN Multimedia

    Alessio, F

    2009-01-01

    The LHCb experiment at CERN is preparing for first real data taking, foreseen by the end of the year 2009 with the start-up of the LHC. A large amount of work of commissioning, tests and improvements of the full detector has been done in order to optimize its performance. During my first year as a Doctoral Student at CERN, I have been working on the timing and readout control of the LHCb experiment in the frame of the LHCb Online group. The group is responsible for the full data acquisition of the LHCb experiment, from the Front-End Electronics (FEE) to the storage of the data for offline analysis, as well as the Timing and Fast Control (TFC) system. The latter controls and distributes centrally timing and trigger information, as well as synchronous and asynchronous commands to the readout system. It is also responsible for receiving and adjusting the bunch and orbit clocks of the LHC machine and distributing it to the electronics of the whole experiment. It is of vital importance to assure that the timing o...

  17. Validation of the Data Consolidation in Layout Database for the LHC Tunnel Cryogenics Controls Upgrade

    CERN Document Server

    Tovar-Gonzalez, A; Blanco, E; Fortescue-Beck, E; Fluder, C; Inglese, V; Pezzetti, M; Gomes, P; Wolak, T; Dudek, M; Frassinelli, F; Drozd, A; Zapolski, M

    2014-01-01

    The control system of the Large Hadron Collider cryogenics manages over 34’000 instrumentation and actuator channels. The complete information on their characteristics and parameters can be extracted from a set of views on the Layout database, to generate the specifications of the control system; from these, the code to populate PLCs (Programmable Logic Controller) and SCADA (Supervisory Control & Data Acquisition) is automatically produced, within the UNICOS framework (Unified Industrial Control System). The Layout database is, since 2003, progressively integrating and centralizing information on the whole CERN Accelerator complex. It models topographical organization (layouts) as functional positions and relationships. After three years of machine operation, many parameters have been manually adjusted in SCADA and PLCs; they now differ from their original values in the Layout database. Furthermore, to accommodate the upgrade of the UNICOS Continuous Process Control package to version 6, some data stru...

  18. RF System Modelling for the JLab 12 GeV Upgrade and RIA

    International Nuclear Information System (INIS)

    Alicia Hofler; Jean Delayen; Hovater, J.; Stefan Simrock

    2003-01-01

    Jefferson Lab is using the MATLAB/Simulink library for RF systems developed for TTF as a tool to develop a model of its 12 GeV upgrade and the Rare Isotope Accelerator (RIA) to study the behavior and performance of the RF control system. The library includes elements describing a superconducting cavity with mechanical modes excited by Lorentz Force effects and a klystron including saturation characteristics. It can be applied to gradient and phase or in-phase and quadrature control for cavities operating in either a self-excited loop or generator driven mode. We will provide an overview of the theory behind the library components and present initial modeling results for Jefferson Lab's 12 GeV Upgrade and the RIA systems

  19. Fault tree analysis of Project S-4404, Upgrade Canyon Exhaust System

    International Nuclear Information System (INIS)

    Browne, E.V.; Low, J.M.; Lux, C.R.

    1992-01-01

    Project S-4404, Upgrade Canyon Exhaust Systems, is a $177 million project with the purpose of upgrading the Exhaust Systems for both F and H Canyon Facilities. This upgrade will replace major portions of the F and H-Canyon exhaust systems, downstream of their respective sand filters with higher capacity and more reliable systems. Because of the high cost, DOE requested Program Control ampersand Integration (PC ampersand I) to examine specific deletions to the project. PC ampersand I requested Nuclear Processes Safety Research (NPSR) to perform an analysis to compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed exhaust system and specific proposed exhaust system alternatives. The objective of this work was to perform an analysis and compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed project exhaust system and proposed project alternatives. Based on fault tree analysis, two conclusions are made. First, D ampersand D activities can be eliminated from the project with no significant decrease to exhaust system safety. Deletion of D ampersand D activities would result in a cost savings of $29 million. Second, deletion of DOE Order 6430.1A requirements regarding DBAs would decrease exhaust system safety by a factor of 12

  20. Studies for the ALICE inner tracking system upgrade

    International Nuclear Information System (INIS)

    Reidt, Felix

    2016-01-01

    The ALICE experiment at the CERN LHC identifies D"0 mesons via secondary-vertex reconstruction and topological cuts to reduce the corresponding combinatorial background in heavy-ion collisions. The D"0 meson is produced promptly in initial, hard scatterings via the strong interaction or as feed-down from weakly decaying B hadrons. Within this thesis, a novel method for the separation of prompt and feed-down D"0 mesons using cut variations was implemented and applied to data from p-Pb collisions at √(s_N_N)=5.02 TeV. The effectiveness of the secondary-vertex reconstruction strongly depends on the performance and in particular the pointing resolution of the Inner Tracking System. The upgrade of the ALICE Inner Tracking System for the Long Shutdown 2 of the LHC in 2019/2020 will significantly improve its vertex-reconstruction and tracking capabilities. It will be equipped with Monolithic Active Pixel Sensors manufactured using the TowerJazz 180 nm CMOS process on wafers with a high-resistivity epitaxial layer. In another part of this thesis, several pixel-chip prototypes of the ALPIDE architecture with in-pixel amplification and discrimination as well as in-matrix data reduction were characterised. The pALPIDE-2 prototype was measured to fulfil the requirements in terms of detection efficiency, fake-hit rate, position resolution and tolerance to irradiation with non-ionising energy loss. Based on simulations modelling the tracking and vertex-reconstruction performance of the upgraded Inner Tracking System, the perspective of the feed-down separation using cut variations after the upgrade was assessed within this thesis.

  1. Studies for the ALICE inner tracking system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Reidt, Felix

    2016-04-28

    The ALICE experiment at the CERN LHC identifies D{sup 0} mesons via secondary-vertex reconstruction and topological cuts to reduce the corresponding combinatorial background in heavy-ion collisions. The D{sup 0} meson is produced promptly in initial, hard scatterings via the strong interaction or as feed-down from weakly decaying B hadrons. Within this thesis, a novel method for the separation of prompt and feed-down D{sup 0} mesons using cut variations was implemented and applied to data from p-Pb collisions at √(s{sub NN})=5.02 TeV. The effectiveness of the secondary-vertex reconstruction strongly depends on the performance and in particular the pointing resolution of the Inner Tracking System. The upgrade of the ALICE Inner Tracking System for the Long Shutdown 2 of the LHC in 2019/2020 will significantly improve its vertex-reconstruction and tracking capabilities. It will be equipped with Monolithic Active Pixel Sensors manufactured using the TowerJazz 180 nm CMOS process on wafers with a high-resistivity epitaxial layer. In another part of this thesis, several pixel-chip prototypes of the ALPIDE architecture with in-pixel amplification and discrimination as well as in-matrix data reduction were characterised. The pALPIDE-2 prototype was measured to fulfil the requirements in terms of detection efficiency, fake-hit rate, position resolution and tolerance to irradiation with non-ionising energy loss. Based on simulations modelling the tracking and vertex-reconstruction performance of the upgraded Inner Tracking System, the perspective of the feed-down separation using cut variations after the upgrade was assessed within this thesis.

  2. Digital control of the superconducting cavities for the LEP energy upgrade

    International Nuclear Information System (INIS)

    Gavallari, G.; Ciapala, E.

    1992-01-01

    The superconducting (SC) cavities for the LEP200 energy upgrade will be installed in units of 16 as for the present copper cavity system. Similar equipment will be used for RF power generation and distribution, for the low-level RF system and for digital control. The SC cavities and their associated equipment however require different interface hardware and new control software. To simplify routine operation control of the SC cavity units is made to resemble as closely as possible that of the existing units. Specific controls for the SC cavities at the equipment level, the facilities available and the integration of the SC cavity units into the LEP RF control system are described. (author)

  3. 4 MW upgrade to DIII-D FWCD system: System commissioning and initial operation

    International Nuclear Information System (INIS)

    Cary, W.P.; Callis, R.W.; deGrassie, J.S.; Harris, T.E.; O'Neill, R.C.; Pinsker, R.I.; Baity, F.W.; Barber, G.C.; Ferguson, S.W.

    1995-01-01

    The initial installation of the 4 MW fast wave current drive (FWCD) upgrade started in 1992 with the purchase of two ABB/Thomcast AG rf power amplifiers. These amplifiers cover the frequency range 30 MHz to 120 MHz. A maximum output power of over 2 MW between 30 MHz and 80 MHz and 1 MW at 120 MHz were the specification requirements. The system as installed is comprised of the two mentioned rf amplifiers, coaxial transmission and matching components, rf phase and amplitude monitoring, and a SUN SparcStation 10 control system. Due to various reasons almost every major component in the system required redesign and engineering in order to meet the system requirements. The failures, probable cause and the final redesigns will be discussed as well as some thoughts on how better to specify system requirements for future systems

  4. 4 MW upgrade to DIII-D FWCD system: System commissioning and initial operation

    International Nuclear Information System (INIS)

    Cary, W.P.; Callis, R.W.; Grassie, J.S. de; Harris, T.E.; O'Neill, R.C.; Pinsker, R.I.; Baity, F.W.; Barber, G.C.; Ferguson, S.W.

    1995-10-01

    The initial installation of the 4 MW fast wave current drive (FWCD) upgrade started in 1992 with the purchase of two ABB/Thomcast AG rf power amplifiers. These amplifiers cover the frequency range 30 MHz to 120 MHz. A maximum output power of over 2 MW between 30 MHz and 80 MHz and 1 MW at 120 MHz were the specification requirements. The system as installed is comprised of the two mentioned rf amplifiers, coaxial transmission and matching components, rf phase and amplitude monitoring, and a SUN SparcStation 10 control system. Due to various reasons almost every major component in the system required redesign and engineering in order to meet the system requirements. The failures, probable cause and the final redesigns will be discussed as well as some thoughts on how better to specify system requirements for future systems

  5. The upgrade of nuclear material accounting system at KAERI

    International Nuclear Information System (INIS)

    Kim, Hyun Jo; Kim, Hyun Sook; Park, Ho Jun; Ko, Han Suk; Lee, Byung Doo

    2010-01-01

    The agreement between the government of Republic Of Korea (ROK) and the IAEA for the application of safeguards was signed and entered into force in 1975. The Additional Protocol (AP) to the Safeguards Agreement between the ROK and the IAEA was signed in 1999 and entered into force on 19 February 2004. Also, Implementation of Integrated Safeguards (IS) was started on 1 July, 2008 after a draw of the broader conclusion. The IAEA provides 2 hours notification for Random Interim Inspection (RII) under IS. For RII, the facility has to prepare the inspection documents in a short time. Therefore, KAERI (Korea Atomic Energy Research Institute) developed a new computerized nuclear material accounting system named KASIS (KAERI Safeguards Information treatment System) to treat the data by on-line for RII. For the efficient IS implementation, KAERI has a plan to upgrade the system to reflect the accounting approaches or reporting procedure according to facility characteristic. This paper describes the upgrade of the nuclear material accounting system and the efforts to reduce the burden of the facility operators

  6. Common cause analysis of the TREAT upgrade reactor protection system

    Energy Technology Data Exchange (ETDEWEB)

    Page, R.J.; Kamis, G.J.; Marbach, R.A.; Mueller, C.J.

    1984-09-01

    A triply redundant reactor scram system (RSS) has been designed for the upgraded TREAT facility. The independent failures reliability goal for the RSS is <10/sup -9/ failures per demand. An independent failures analysis indicated that this goal would be met. In addition, however, recognizing that in heavily redundant systems common-cause failures dominate, a common cause analysis of the TREAT upgrade RSS was done. The objective was to identify those common-cause initiators which could affect the functioning of the RSS, and to subsequently modify the design of the RSS so that the effect was minimized. A number of common-cause initiators were identified which were capable of defeating the triple redundancy feature of the reactor scram system. By means of a systematic analysis of the effect these initiators could have on the system, it was possible to identify seven necessary design and procedural modifications that would greatly reduce the probability of the reactor being run while the RSS was in a faulted condition.

  7. System upgradation for surface mode negative ion beam extraction experiments in ROBIN

    International Nuclear Information System (INIS)

    Pandya, Kaushal; Bansal, Gourab; Gahlaut, Agrajit; Soni, Jignesh; Yadav, Ratnakar K.; Mahesh, Vuppugalla; Tyagi, Himanshu; Parmar, KanuG.; Mistri, Hiren; Bhagora, Jighesh; Prajapati, Bhavesh; Patel, Kartik; Bhuyan, Manas; Gouswami, Mehul; Bandyopadhyay, Mainak; Chakraborty, Arun K.

    2017-01-01

    Operational commissioning of ROBIN forms an important milestone in the Indian programme on the R&D on negative ion beams. The commissioning activity has been effected in sequence, in synchronisation with the availability of High voltage Power Supply (HVPS) systems and routine operation has now been established in the cesiated, surface mode. Significant efforts have been placed in upgrading the system to initiate the surface mode operation. These include incorporation of a temperature controlled Cesium (Cs) delivery system, spectroscopic diagnostics for detection of Cs lines, installation of plasma grid heating and closed loop warm water circuit for source components heating and Doppler Shift Spectroscopy (DSS) system. The specific design and integration features for these upgrades are discussed and preliminary results obtained from the operation of ROBIN in the surface mode are presented.

  8. System upgradation for surface mode negative ion beam extraction experiments in ROBIN

    Energy Technology Data Exchange (ETDEWEB)

    Pandya, Kaushal, E-mail: kpandya@ipr.res.in [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Bansal, Gourab; Gahlaut, Agrajit; Soni, Jignesh [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Yadav, Ratnakar K. [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Mahesh, Vuppugalla [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Tyagi, Himanshu [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Parmar, KanuG.; Mistri, Hiren [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Bhagora, Jighesh [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Prajapati, Bhavesh; Patel, Kartik [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Bhuyan, Manas [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Gouswami, Mehul [Bhakti Management Services, Gandhinagar, 382007, Gujarat (India); Bandyopadhyay, Mainak [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Chakraborty, Arun K. [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India)

    2017-01-15

    Operational commissioning of ROBIN forms an important milestone in the Indian programme on the R&D on negative ion beams. The commissioning activity has been effected in sequence, in synchronisation with the availability of High voltage Power Supply (HVPS) systems and routine operation has now been established in the cesiated, surface mode. Significant efforts have been placed in upgrading the system to initiate the surface mode operation. These include incorporation of a temperature controlled Cesium (Cs) delivery system, spectroscopic diagnostics for detection of Cs lines, installation of plasma grid heating and closed loop warm water circuit for source components heating and Doppler Shift Spectroscopy (DSS) system. The specific design and integration features for these upgrades are discussed and preliminary results obtained from the operation of ROBIN in the surface mode are presented.

  9. SWATCH Common software for controlling and monitoring the upgraded CMS Level-1 trigger

    CERN Document Server

    Lazaridis, Christos; Bunkowski, Karol; Codispoti, Giuseppe; Dirkx, Glenn; Ghabrous Larrea, Carlos; Lingemann, Joschka; Kreczko, Lukasz; Thea, Alessandro; Williams, Tom

    2017-01-01

    The Large Hadron Collider at CERN restarted in 2015 with a higher centre-of-mass energy of 13 TeV. The instantaneous luminosity is expected to increase significantly in the coming years. An upgraded Level-1 trigger system is being deployed in the CMS experiment in order to maintain the same efficiencies for searches and precision measurements as those achieved in the previous run. This system must be controlled and monitored coherently through software, with high operational efficiency.The legacy system is composed of approximately 4000 data processor boards, of several custom application-specific designs. These boards are organised into several subsystems; each subsystem receives data from different detector systems (calorimeters, barrel/endcap muon detectors), or with differing granularity. These boards have been controlled and monitored by a medium-sized distributed system of over 40 computers and 200 processes. Only a small fraction of the control and monitoring software was common between the different s...

  10. Regulatory requirements for replacement of analog systems with digital upgrades

    International Nuclear Information System (INIS)

    Loeser, P.J.

    1993-01-01

    This paper reviews briefly the regulatory guidelines which must be met in order to replace analog systems in nuclear power plants with digital systems. There is a move to do such replacements for a number of reasons: analog systems are aging, and showing considerable drift; few vendors manufacture analog systems today; support and parts are hard to get; digital systems provide flexibility. There is a safety concern however about undesirable and unpredictable effects to digital safety equipment due to plant transients, accidents, post-accident condition, and EMI/RF environmental interferences. License holders must comply with the requirements of 10 C.F.R. 50.59, which deals with safety concerns with respect to any changes to operating plants which may have an impact on the safety of the plant. NRC staff is taking the position that all digital upgrades will require an evaluation under this regulation

  11. The A0 abort system for the Tevatron upgrade

    International Nuclear Information System (INIS)

    Crawford, C.

    1989-01-01

    The installation of electrostatic separator modules at B48 and C17 in the Tevatron necessitates changes to the Tevatron abort system. There will no longer be room for either the proton or antiproton kicker magnets used in the present system. The kickers at C17 will be permanently removed. The kickers at B48 will be temporarily removed for collider operation and will be replaced for fixed target operation. The existing proton abort system will remain unchanged during fixed target operation. This note describes a proposed abort system for operation in the collider mode for 22 on 22 bunches and provides details of specifications for the required components. In certain cases, for example in the case of the pulsers for the magnets and the absorber assembly, system components are designed with the option of upgrading to 44 on 44 bunch operation in mind. 8 refs., 14 figs

  12. Tracker controls development and control architecture for the Hobby-Eberly Telescope Wide Field Upgrade

    Science.gov (United States)

    Mock, Jason R.; Beno, Joe; Rafferty, Tom H.; Cornell, Mark E.

    2010-07-01

    To enable the Hobby-Eberly Telescope Wide Field Upgrade, the University of Texas Center for Electromechanics and McDonald Observatory are developing a precision tracker system - a 15,000 kg robot to position a 3,100 kg payload within 10 microns of a desired dynamic track. Performance requirements to meet science needs and safety requirements that emerged from detailed Failure Modes and Effects Analysis resulted in a system of 14 precision controlled actuators and 100 additional analog and digital devices (primarily sensors and safety limit switches). This level of system complexity and emphasis on fail-safe operation is typical of large modern telescopes and numerous industrial applications. Due to this complexity, demanding accuracy requirements, and stringent safety requirements, a highly versatile and easily configurable centralized control system that easily links with modeling and simulation tools during the hardware and software design process was deemed essential. The Matlab/Simulink simulation environment, coupled with dSPACE controller hardware, was selected for controls development and realization. The dSPACE real-time operating system collects sensor information; motor commands are transmitted over a PROFIBUS network to servo amplifiers and drive motor status is received over the same network. Custom designed position feedback loops, supplemented by feed forward force commands for enhanced performance, and algorithms to accommodate self-locking gearboxes (for safety), reside in dSPACE. To interface the dSPACE controller directly to absolute Heidenhain sensors with EnDat 2.2 protocol, a custom communication board was developed. This paper covers details of software and hardware, design choices and analysis, and supporting simulations (primarily Simulink).

  13. Upgrade of the synchronous data management system of the EAST poloidal field power supply

    International Nuclear Information System (INIS)

    Zhu, Lili; Huang, Liansheng; Fu, Peng; Gao, Ge; He, Shiying

    2016-01-01

    Highlights: • The upgraded synchronous data management system of EAST poloidal field power supply supports long-pulse data storage. • Slice storage mechanism on MDSplus has been adopted for quasi real-time data storage. • The state machine has been adopted for managing the system sequencer. • IEEE-1588 protocol via Ethernet for the synchronization of clock signal was detailed described. - Abstract: Poloidal field (PF) power supply is an important subsystem of the Experimental Advanced Superconducting Tokamak (EAST). The upgrade of the PF control system of EAST is a great improvement over the original data management system which could not meet the requirements necessary for experiments on synchronization, modularity and sampling rate. In order to better analyze the power operation performance, the Synchronization Data Management System (SDMS) needs to be upgraded as well. This upgrade is based on distributed data acquisition and an MDSPLUS database. It consists of three data acquisition nodes synchronized by an reference clock from the EAST central timing system that also provides the start trigger of the EAST pulse. After being processed by a signal conditioning unit, experimental signals are digitized and written into the database in MDSPLUS format. Multi-channel, multi-tasking and continuous data storage have been achieved by using multi-threading technology on a Linux operation system. The SDMS has been used on the server in PF control system for the entire 2015 EAST campaign. The SDMS has had good performance during experiments and convenient human-machine interface to satisfy the requirements of all the experiments.

  14. Upgrade of the synchronous data management system of the EAST poloidal field power supply

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Lili; Huang, Liansheng, E-mail: huangls@ipp.ac.cn; Fu, Peng; Gao, Ge; He, Shiying

    2016-11-15

    Highlights: • The upgraded synchronous data management system of EAST poloidal field power supply supports long-pulse data storage. • Slice storage mechanism on MDSplus has been adopted for quasi real-time data storage. • The state machine has been adopted for managing the system sequencer. • IEEE-1588 protocol via Ethernet for the synchronization of clock signal was detailed described. - Abstract: Poloidal field (PF) power supply is an important subsystem of the Experimental Advanced Superconducting Tokamak (EAST). The upgrade of the PF control system of EAST is a great improvement over the original data management system which could not meet the requirements necessary for experiments on synchronization, modularity and sampling rate. In order to better analyze the power operation performance, the Synchronization Data Management System (SDMS) needs to be upgraded as well. This upgrade is based on distributed data acquisition and an MDSPLUS database. It consists of three data acquisition nodes synchronized by an reference clock from the EAST central timing system that also provides the start trigger of the EAST pulse. After being processed by a signal conditioning unit, experimental signals are digitized and written into the database in MDSPLUS format. Multi-channel, multi-tasking and continuous data storage have been achieved by using multi-threading technology on a Linux operation system. The SDMS has been used on the server in PF control system for the entire 2015 EAST campaign. The SDMS has had good performance during experiments and convenient human-machine interface to satisfy the requirements of all the experiments.

  15. The ASDEX upgrade digital video processing system for real-time machine protection

    Energy Technology Data Exchange (ETDEWEB)

    Drube, Reinhard, E-mail: reinhard.drube@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Neu, Gregor [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Cole, Richard H.; Lüddecke, Klaus [Unlimited Computer Systems GmbH, Seeshaupterstr. 15, 82393 Iffeldorf (Germany); Lunt, Tilmann; Herrmann, Albrecht [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

    2013-11-15

    Highlights: • We present the Real-Time Video diagnostic system of ASDEX Upgrade. • We show the implemented image processing algorithms for machine protection. • The way to achieve a robust operating multi-threading Real-Time system is described. -- Abstract: This paper describes the design, implementation, and operation of the Video Real-Time (VRT) diagnostic system of the ASDEX Upgrade plasma experiment and its integration with the ASDEX Upgrade Discharge Control System (DCS). Hot spots produced by heating systems erroneously or accidentally hitting the vessel walls, or from objects in the vessel reaching into the plasma outer border, show up as bright areas in the videos during and after the reaction. A system to prevent damage to the machine by allowing for intervention in a running discharge of the experiment was proposed and implemented. The VRT was implemented on a multi-core real-time Linux system. Up to 16 analog video channels (color and b/w) are acquired and multiple regions of interest (ROI) are processed on each video frame. Detected critical states can be used to initiate appropriate reactions – e.g. gracefully terminate the discharge. The system has been in routine operation since 2007.

  16. The ASDEX upgrade toroidal field magnet and poloidal divertor field coil system adapted to reactor requirements

    International Nuclear Information System (INIS)

    Koeppendoerfer, W.; Blaumoser, M.; Ennen, K.; Gruber, J.; Gruber, O.; Jandl, O.; Kaufmann, M.; Kollotzek, H.; Kotzlowski, H.; Lackner, E.; Lackner, K.; Larcher, T. von; Noterdaeme, J.M.; Pillsticker, M.; Poehlchen, R.; Preis, H.; Schneider, H.; Seidel, U.; Sombach, B.; Speth, E.; Streibl, B.; Vernickel, H.; Werner, F.; Wesner, F.; Wieczorek, A.

    1986-01-01

    ASDEX Upgrade is a tokamak experiment with external poloidal field coils that is now under construction at IPP Garching. It can produce elongated single-null (SN), double-null (DN) , and limiter (L) configurations. The SN is the reference configuration with asymmetric load distributions in the poloidal field (PF) system and the toroidal field (TF) magnet. Plasma control and stabilization require a rigid passive conductor close to the plasma. The design principles of the coils and support structure are described. (orig.)

  17. Upgradation of an Apple IIe based DC arc atomic emission spectrometer to a PC based system

    International Nuclear Information System (INIS)

    Sampathkumar, R.; Ravindranath, S.V.G.; Patil, P.B.; Deshpande, S.S.; Saha, T.K.; Handu, V.K.

    2004-01-01

    The analysis of Uranium metal and its compounds used as reactor fuel for the presence of impurities especially Cd and B which have a high neutron capture cross section is routinely performed in Spectroscopy Division. The DC Arc Atomic Emission Spectrometer in the Division was employing an Apple IIe computer for performing the control and data acquisition jobs. The system was upgraded to a PC based data acquisition system and the necessary software to perform the spectro chemical analysis has been developed. This becomes necessary in a scenario where the commercially available Atomic Emission Spectrometers are no longer equipped with DC arc source. Also the Apple IIe computer which was performing the control and data acquisition has gone obsolete and its spares are no longer available. Therefore, to derive the benefits of using DC arc as excitation source the system was upgraded to a PC based system. This paper describes the upgraded system and the various software features relating to the mode of data acquisition, method of analysis, data processing etc. implemented as required by the analysts. (author)

  18. The upgrade of the muon system of the CMS experiment

    CERN Document Server

    Abbrescia, Marcello

    2014-01-01

    The CMS muon system is based on three types of gaseous detectors, RPC, CSC and DT. While operating very well in the present conditions, upgrades are foreseen for each of the subsystems, necessary to cope with the increased pile-up, coming along with higher rates and radiation, during the upcoming periods of data taking.Moreover, an important issue will be to make the system able to perform its delicate task of muon triggering and tracking also in the High Luminosity phase of LHC, foreseen to start after Long Shutdown 3 in 2023 and to last for about 10 years.Studies devoted to asses the system perfomance stability for the future will be presented. In addition, the stategy - which is being developed - to complement the existing system with new detectors, based on GEM or improved RPC technologies, will be shown.

  19. Upgrade of the monitoring system of LHCb ECAL

    CERN Document Server

    Guz, Iouri; Chernov, Evgeny; Egorychev, Victor; Kandybei, Sergii; Kvaratskheliya, Tengiz; Obraztsov, Vladimir; Perret, Pascal; Philippov, Sergey; Savrina, Daria; Shatalov, Sppavel; Zakoriuchkina, Tatiana; Zhokhov, Anatoli; Zvyagintsev, Serguei

    2016-01-01

    The LHCb ECAL is a shashlik calorimeter of 6016 cells, covering 7.686.24 m2 area. To monitor the readout chain of each ECAL cell, the LHCb ECAL is equipped with a LED based monitoring system. During the LHC Run I (2009-2012) it was found that the precision of the monitoring suffers from the radiation degradation of transparency of polystyrene clear fibers used to transport the LED light to the ECAL photomultipliers. In order to improve the performance of the monitoring system, and especially in view of significant increase of LHCb working luminosity foreseen after 2018, the present plastic fibers have been replaced by radiation hard quartz fibers. The design of the upgraded version of the LHCb ECAL monitoring system is described here. The usage and performance of the new system for the ECAL calibration during the LHCb Run II are discussed.

  20. Beam position monitor multiplexer controller upgrade at the LAMPF proton storage ring

    International Nuclear Information System (INIS)

    Scarborough, W.K.; Cohen, S.

    1992-01-01

    The beam position monitor (BPM) is one of the primary diagnostic tools used for the tuning of the proton storage ring (PSR) at the Clinton P. Anderson Meson Physics Facility (LAMPF). A replacement for the existing, monolithic, wire-wrapped microprocessor-based BPM multiplexer controller has been built. The controller has been redesigned as a modular system retaining the same functionality of the original system built in 1981. Individual printed circuit cards are used for each controller function to insure greater maintainability and ease of keeping a spare parts inventory. Programmable logic device technology has substantially reduced the component count of the new controller. Diagnostic software was written to support the development of the upgraded controller. The new software actually uncovered some flaws in the original CAMAC interface. (author)

  1. Development of controlled drilling technology and measurement method in the borehole. Phase 2. Upgrading of drilling and measurement system and its application to the fault

    International Nuclear Information System (INIS)

    Kiho, Kenzo; Shin, Koichi; Ohtsu, Masashi

    2009-01-01

    In Japan, the soft sedimentary rock of the Neogene tertiary is being focused as a host rock for High Level Waste (HLW) disposal. Especially, the soft sedimentary rock at the coastal area is thought to be one of the best candidates, since there is little driving force of the underground water. The measurement and logging of the bore hole in order to investigate the hydro-geological and geo-mechanical conditions of the host rock is a very important way to examine the potential of the disposal candidates. Since 2000, CRIEPI (Central Research Institute of Electric Power Industry) has been conducting the project on controlled drilling and the logging/measurement technologies in its boreholes. Based on the results of phase 1(2000-2004), CRIEPI has been developing the drilling and logging/measurement technologies for fault zone during phase 2 (2005-2007). The drilling technology such as drilling for fault zone, horizontal drilling, long hole drilling, coring and locality detection was developed and these applicability was confirmed while drilling. The permeability/water-sampling/imaging tool was revised to apply wider borehole and longer measuring section. The WL-LWD was improved to be tougher in the hole. The borehole pressure meter and stress measurement tools were unified. Each tools necessary for the monitoring system is manufactured. The applicability of these tools and systems were verified in the borehole. After conducting surveys for the Omagari fault distributing at the Kami-horonobe area, the drilling site and borehole trace was decided in 2005. Considering the planned trace, the bore hole was drilled to the 683.5m long and its core recovery was 99.8%. Using borehole logging/measurement/survey, the geological, hydrological, geo-mechanical, geophysical and geochemical data were collected and the Omagari fault was characterized. (author)

  2. Upgrading Supply Chain Management Systems to Improve Availability of Medicines in Tanzania: Evaluation of Performance and Cost Effects.

    Science.gov (United States)

    Mwencha, Marasi; Rosen, James E; Spisak, Cary; Watson, Noel; Kisoka, Noela; Mberesero, Happiness

    2017-09-27

    To address challenges in public health supply chain performance, Tanzania invested in a national logistics management unit (LMU) and a national electronic logistics management information system (eLMIS). This evaluation examined the impact of those 2 key management upgrades approximately 1 year after they were introduced. We used a nonexperimental pre-post study design to compare the previous system with the upgraded management system. We collected baseline data from August to November 2013. We conducted round 1 of post-implementation data collection during April and May 2015, about 1 year after implementation of the upgrades. We evaluated key indicators of data use and reporting; supply chain management practices such as storage and supervision; supply chain performance including stock-out and expiry rates; and supply chain cost and savings. We analyzed the data using a range of techniques including statistical testing of baseline and round-1 results, and cost, cost-effectiveness, and return on investment analysis. The upgrades were associated with improvements in data use, accessibility, visibility, and transparency; planning, control, and monitoring; support for quantification; stock-out rates; stock-out duration; commodity expiry; and forecast error. The upgraded system was more costly, but it was also more efficient, particularly when adjusting for the performance improvements. The upgrades also generated substantial savings that defrayed some, but not all, of the investment costs. Upgrades to Tanzania's supply chain management systems created multiple and complex pathways to impact. One year after implementation, the LMU and eLMIS brought about performance improvements through better data use and through improvements in some, but not all, management practices. Furthermore, the upgrades-while not inexpensive-contributed to greater system efficiency and modest savings. © Mwencha et al.

  3. Upgraded Steam Generator Lancing System for Uljin NPP no.2

    International Nuclear Information System (INIS)

    Kim, Seok Tae; Jeong, Woo Tae; Hong, Sung Yull

    2005-01-01

    KEPRI(Korea Electric Power Research Institute) has developed various types of steam generator lancing systems since 1998. In this paper, we introduce a new lancing system with new improvements from the previous steam generator lancing system for Uljin NPP #2(nuclear power plant) constructed by KEPRI. The previous lancing system is registered as KALANS R -II and was developed for System-80 type steam generators. The previous lancing system was applied to Uljin unit #3 and it lowered radiation exposure of operators in comparison to manually operated lancing systems. And it effectively removed sludge accumulated around kidney bean zone in the Uljin unit #3 steam generators. But the previous lancing system could only clean partially the steam generators of Uljin unit #4. This was because the rail of the previous lancing system interfered with a part of the steam generator. Therefore we developed a new lancing system that can solve the interference problem. This new lancing system was upgraded from the previous lancing system. Also, a new lancing system for System-80 S/G will be introduced in this paper

  4. Control of MHD instabilities by ECCD: ASDEX Upgrade results and implications for ITER

    International Nuclear Information System (INIS)

    Zohm, H.; Gantenbein, G.; Leuterer, F.; Manini, A.; Maraschek, M.; Yu, Q.

    2007-01-01

    The requirements for control of MHD instabilities by electron cyclotron current drive (ECCD) are reviewed. It is shown that a localized current drive is needed for control of both sawteeth and neoclassical tearing modes (NTMs). In the case of NTMs, the deposition width should be smaller than the island width for efficient control. At island widths smaller than the deposition width, as is predicted to occur in ITER, theory suggests that efficient control is possible only by modulating the ECCD power in phase with the island. These predictions are experimentally confirmed in ASDEX Upgrade for NTM control. Narrow deposition has also been used to extend the operational range of NTM stabilization in ASDEX Upgrade to lower q 95 and in the improved H-mode scenario. Our results suggest that, for the ITER ECCD system, good localization of the driven current profile as well as the capability to modulate the ECCD in phase with rotating modes will be needed for efficient MHD control by ECCD

  5. Operational upgrades to the DIII-D 60 GHz electron cyclotron resonant heating system

    International Nuclear Information System (INIS)

    Harris, T.E.; Cary, W.P.

    1993-10-01

    One of the primary components of the DIII-D radio frequency (rf) program over the past seven years has been the 60 GHz electron cyclotron resonant heating (ECRH) system. The system now consists of eight units capable of operating and controlling eight Varian VGE-8006 60 GHz, 200 kW gyrotrons along with their associated waveguide components. This paper will discuss the operational upgrades and the overall system performance. Many modifications were instituted to enhance the system operation and performance. Modifications discussed in this paper include an improved gyrotron tube-fault response network, a computer controlled pulse-timing and sequencing system, and an improved high-voltage power supply control interface. The discussion on overall system performance will include operating techniques used to improve system operations and reliability. The techniques discussed apply to system start-up procedures, operating the system in a conditioning mode, and operating the system during DIII-D plasma operations

  6. HESYRL control system status

    International Nuclear Information System (INIS)

    Yao Chihyuan

    1992-01-01

    HESYRL synchrotron radiation storage ring was completed in 1989 and has been in commissioning since then. Now it has met its design specification and is ready for synchrotron light experiments. Control system of the project was completed in 1989 and some modifications were made during commissioning. This paper describes its present configuration, status and upgrading plan. (author)

  7. High rate tests of the LHCb RICH Upgrade system

    CERN Multimedia

    Blago, Michele Piero

    2016-01-01

    One of the biggest challenges for the upgrade of the LHCb RICH detectors from 2020 is to readout the photon detectors at the full 40 MHz rate of the LHC proton-proton collisions. A test facility has been setup at CERN with the purpose to investigate the behaviour of the Multi Anode PMTs, which have been proposed for the upgrade, and their readout electronics at high trigger rates. The MaPMTs are illuminated with a monochromatic laser that can be triggered independently of the readout electronics. A first series of tests, including threshold scans, is performed at low trigger rates (20 kHz) for both the readout and the laser with the purpose to characterise the behaviour of the system under test. Then the trigger rate is increased in two separate steps. First the MaPMTs are exposed to high illumination by triggering the pulsed laser at a high (20 MHz) repetition rate while the DAQ is readout at the same low rate as before. In this way the performance of the MaPMTs and the attached electronics can be evaluated ...

  8. The upgrade of the ALICE Inner Tracking System

    CERN Document Server

    Ravasenga, Ivan

    2017-01-01

    In 2021, for the third run of the CERN Large Hadron Collider (LHC), Pb-Pb collisions will be performed at a centre-of-mass energy per nucleon of 5.5 TeV, with an integrated luminosity of $6 \\times 10^{27}$ cm$^{-2}$ s$^{-1}$ and at an unprecedented interaction rate up to 50 kHz. To fulfil the requirements of the ALICE physics program for Run 3, the ALICE experiment at LHC is planning a major upgrade during the Long Shutdown 2 of LHC in 2019-2020. One of the key elements, is the construction of a new ultra-light and high-resolution Inner Tracking System (ITS). The upgraded ITS will significantly enhance the determination of the distance of closest approach to the primary vertex, the tracking efficiency at low transverse momenta, and the read-out rate capabilities, with respect to what can be achieved with the current detector. It will consist of seven layers equipped with silicon Monolithic Active Pixel Sensors (MAPS) with a pixel size of the order of $30 \\times 30 \\mu m^2$. They will be produced by Towerjazz ...

  9. Upgrading of analogue gamma cameras with PC based computer system

    International Nuclear Information System (INIS)

    Fidler, V.; Prepadnik, M.

    2002-01-01

    Full text: Dedicated nuclear medicine computers for acquisition and processing of images from analogue gamma cameras in developing countries are in many cases faulty and technologically obsolete. The aim of the upgrading project of International Atomic Energy Agency (IAEA) was to support the development of the PC based computer system which would cost 5.000 $ in total. Several research institutions from different countries (China, Cuba, India and Slovenia) were financially supported in this development. The basic demands for the system were: one acquisition card an ISA bus, image resolution up to 256x256, SVGA graphics, low count loss at high count rates, standard acquisition and clinical protocols incorporated in PIP (Portable Image Processing), on-line energy and uniformity correction, graphic printing and networking. The most functionally stable acquisition system tested on several international workshops and university clinics was the Slovenian one with a complete set of acquisition and clinical protocols, transfer of scintigraphic data from acquisition card to PC through PORT, count loss less than 1 % at count rate of 120 kc/s, improvement of integral uniformity index by a factor of 3-5 times, reporting, networking and archiving solutions for simple MS network or server oriented network systems (NT server, etc). More than 300 gamma cameras in 52 countries were digitized and put in the routine work. The project of upgrading the analogue gamma cameras yielded a high promotion of nuclear medicine in the developing countries by replacing the old computer systems, improving the technological knowledge of end users on workshops and training courses and lowering the maintenance cost of the departments. (author)

  10. Design concepts for the reactor protection and control process instrumentation digital upgrade project at the Donald C. Cook Nuclear Plant units 1 and 2

    International Nuclear Information System (INIS)

    Carruth, R.C.; Sotos, W.G.

    1996-01-01

    As the nation's nuclear power plants age, the need to consider upgrading of their electronic protection and control systems becomes more urgent. Hardware obsolescence and mechanical wear out resulting from frequent calibration and surveillance play a major role in defining their useful life. At Cook Nuclear Plant, a decision was made to replace a major portion of the plant's protection and control systems with newer technology. This paper describes the engineering processes involved in this successful upgrade and explains the basis for many decisions made while performing the digital upgrade

  11. AN INTERNET RACK MONITOR-CONTROLLER FOR APS LINAC RF ELECTRONICS UPGRADE

    Energy Technology Data Exchange (ETDEWEB)

    Ma, Hengjie; Smith, Terry; Nassiri, Alireza; Sun, Yine; Doolittle, Lawrence; Ratti, Alex

    2016-06-01

    To support the research and development in APS LINAC area, the existing LINAC rf control performance needs to be much improved, and thus an upgrade of the legacy LINAC rf electronics becomes necessary. The proposed upgrade plan centers on the concept of using a modern, network-attached, rackmount digital electronics platform –Internet Rack Monitor-Controller (or IRMC) to achieve the goal of modernizing the rf electronics at a lower cost. The system model of the envisioned IRMC is basically a 3-tier stack with a high-performance DSP in the mid-layer to perform the core tasks of real-time rf data processing and controls. The Digital Front-End (DFE) attachment layer at bottom bridges the applicationspecific rf front-ends to the DSP. A network communication gateway, together with an embedded event receiver (EVR) in the top layer merges the Internet Rack MonitorController node into the networks of the accelerator controls infrastructure. Although the concept is very much in trend with today’s Internet-of-Things (IoT), this implementation has actually been used in the accelerators for over two decades.

  12. Controlled tungsten melting and droplet ejection studies in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Krieger, K; Lunt, T; Dux, R; Janzer, A; Müller, H W; Potzel, S; Pütterich, T; Yang, Z

    2011-01-01

    Tungsten rods of 1×1×3 mm 3 were exposed in single H-mode discharges at the outer divertor target plate of ASDEX Upgrade using the divertor manipulator system. Melting of the W rod at a pre-defined time was induced by moving the initially far away outer strike point close to the W-rod position. Visible light emissions of both the W pin and consecutively ejected W droplets were recorded by two fast cameras with crossed viewing cones. The time evolution of the local W source at the pin location was measured by spectroscopic observation of the WI line emission at 400.9 nm and compared to the subsequent increase of tungsten concentration in the confined plasma derived from tungsten vacuum UV line emission. Combining these measurements with the total amount of released tungsten due to the pin melt events and ejected droplets allowed us to derive an estimate of the screening factor for this type of tungsten source. The resulting values of the tungsten divertor retention in the range 10-20 agree with those found in previous studies using a W source of sublimated W(CO) 6 vapour at the same exposure location. Ejected droplets were found to be always accelerated in the general direction of the plasma flow, attributed to friction forces and to rocket forces. Furthermore, the vertically inclined target plates cause the droplets, which are repelled by the target plate surface potential due to their electric charge, to move upwards against gravity due to the centrifugal force component parallel to the target plate.

  13. Research on real-time simulation test for upgrades of digital I and C system in nuclear power plant

    International Nuclear Information System (INIS)

    Shi Ji; Jiang Mingyu; Ma Yunqin

    2005-01-01

    The developing trend that digital instrument and control (I and C) system will supplant traditional analog I and C system in nuclear power plant is emphasized. This paper introduces mathematical model of steam generator of full scope simulator for nuclear power plant. The independent real-time simulation system, which forms the interactive closed loop together with the steam generator control system, can be applied to provide a simulation target for upgrades of instrument and control system and the research of control schemes. At the same time, a simulation method for this purpose is presented in this paper. In this method all of the hardware and software are composed of real distributed control system except the model of controlled object. This will not only create favorable conditions for commissioning on site in the future, but also give a theoretical analysis for upgrades of digital I and C system in nuclear power plant. (authors)

  14. THE DEVELOPMENT OF DETAILED HUMAN FACTORS ENGINEERING GUIDELINES FOR DIGITAL CONTROL ROOM UPGRADES

    International Nuclear Information System (INIS)

    BROWN, W.; O'HARA, J.M.

    2004-01-01

    As part of the Department of Energy and Electric Power Research Institute's hybrid control room project, detailed human factors engineering guidance was developed for designing human-system interfaces that may be affected by introduction of additional digital technology during modernization of nuclear power plants. The guidance addresses several aspects of human-system interaction: information display, interface management, soft controls, alarms, computer-based procedures, computerized operator support systems, communications, and workstation/workplace design. In this paper, the ways in which digital upgrades might affect users' interaction with systems in each of these contexts are briefly described, and the contents of the guidance developed for each of the topics is also described

  15. Common software for controlling and monitoring the upgraded CMS Level-1 trigger

    CERN Document Server

    Codispoti, Giuseppe

    2017-01-01

    The Large Hadron Collider restarted in 2015 with a higher centre-of-mass energy of 13 TeV. The instantaneous luminosity is expected to increase significantly in the coming years. An upgraded Level-1 trigger system was deployed in the CMS experiment in order to maintain the same efficiencies for searches and precision measurements as those achieved in 2012. This system must be controlled and monitored coherently through software, with high operational efficiency.The legacy system was composed of a large number of custom data processor boards; correspondingly, only a small fraction of the software was common between the different subsystems. The upgraded system is composed of a set of general purpose boards, that follow the MicroTCA specification, and transmit data over optical links, resulting in a more homogeneous system. The associated software is based on generic components corresponding to the firmware blocks that are shared across different cards, regardless of the role that the card plays in the system. ...

  16. Applications of microprocessors in upgrading of accelerator controls

    International Nuclear Information System (INIS)

    Mallory, K.B.

    1977-03-01

    Experience at SLAC demonstrates that the criteria for selection and use of microprocessors in modifying an existing control system may differ from the criteria that apply during installation of the control system of a new accelerator. Considerations such as cost of individual projects, progressive installation without disruption of operations and training of on-board personnel can outweigh ''obvious'' goals such as standardization of hardware, uniformity of software, or even a rigid specification of link protocols with the main computer system

  17. Nitric Acid Revamp and Upgrading of the Alarm & Protection Safety System at Petrokemija, Croatia

    Directory of Open Access Journals (Sweden)

    Hoško, I.

    2012-04-01

    Full Text Available Every industrial production, particularly chemical processing, demands special attention in conducting the technological process with regard to the security requirements. For this reason, production processes should be continuously monitored by means of control and alarm safety instrumented systems. In the production of nitric acid at Petrokemija d. d., the original alarm safety system was designed as a combination of an electrical relay safety system and transistorized alarm module system. In order to increase safety requirements and modernize the technological process of nitric acid production, revamping and upgrading of the existing alarm safety system was initiated with a new microprocessor system. The newly derived alarm safety system, Simatic PCS 7, links the function of "classically" distributed control (DCS and logical systems in a common hardware and software platform with integrated engineering tools and operator interface to meet the minimum safety standards with safety integrity level 2 (SIL2 up to level 3 (SIL3, according to IEC 61508 and IEC 61511. This professional paper demonstrates the methodology of upgrading the logic of the alarm safety system in the production of nitric acid in the form of a logical diagram, which was the basis for a further step in its design and construction. Based on the mentioned logical diagram and defined security requirements, the project was implemented in three phases: analysis and testing, installation of the safety equipment and system, and commissioning. Developed also was a verification system of all safety conditions, which could be applied to other facilities for production of nitric acid. With the revamped and upgraded interlock alarm safety system, a new and improved safety boundary in the production of nitric acid was set, which created the foundation for further improvement of the production process in terms of improved analysis.

  18. Upgrade of the data acquisition system for the A2 experiment at MAMI

    Energy Technology Data Exchange (ETDEWEB)

    Neiser, Andreas; Gradl, Wolfgang [Institut fuer Kernphysik, Johann-Joachim-Becher-Weg 45, Mainz (Germany)

    2015-07-01

    The A2 collaboration at the electron accelerator MAMI in Mainz uses energy-tagged photons to produce light mesons off the nucleon. Its current data acquisition system is the major performance bottleneck under typical trigger conditions. Furthermore, the availability of spare parts is limited, which renders the maintainability for the next decade difficult. Thus, an upgraded system is desirable for A2 to achieve the upcoming experimental goals. For this upgrade, an FPGA-based solution using the TRB3 is being considered. The TRB3 is a multi-purpose 4+1 FPGA board, where four peripheral FPGAs communicate with one add-on board each. The central FPGA provides data readout via standard gigabit Ethernet and interconnection to other TRB3s via optical links. The TRB3 collaboration currently provides flexible TDC-in-FPGA firmwares with various discrimination front-ends as well as a 48 channel ADC add-on board with 60 MHz sampling rate and 10 bit resolution. Additionally, an extensive software framework for slow control and readout is available. We present energy and timing measurements with the ADC add-on board at the Crystal Ball NaI(Tl) calorimeter and compare the performance to the currently used COMPASS data acquisition system. Furthermore, we give an outlook on possible feature extraction firmwares and estimate the costs for a complete upgrade of the system.

  19. Typical cost analysis of I and C System Upgrade for NPPs in Korea

    International Nuclear Information System (INIS)

    Hyun, J. W.; Sung, C. H.; Chung, H. Y.

    2007-01-01

    About 450 nuclear power plants are operating in the world and almost half of these nuclear power plants are at least 20 years old. Most existing I and C(Instrumentation and Control) systems in nuclear power plants throughout the world were built with analog equipment and relays that were designed 30 to 50 years ago. And among these nuclear power plants many utilities are needed to modernize their I and C systems due to obsolescence and aging etc. Due to the upgrade characteristics of High cost and long term, in-depth feasibility study with systematic investment planning is needed for successful I and C modernization. Besides, in order to perform an efficient modernization project, cost effective analysis which is an essential factor for the Cost-benefit investment must be considered first. In this paper, a typical calculation has been made for evaluating the cost of each I and C upgrade for the target of Westinghouse plants in Korea and compared with the operating maintenance cost. This study is made in a part of economic analysis for research task, named 'Development of Reliability Evaluation system for Upgrading Nuclear Power Plant I and C systems', which performed during 2004 - 2007

  20. Development of the irradiation facility SIBO INRA/Tangier, Morocco by upgrading cobalt-60 in a temporary pool and enhancing safety and control features

    Directory of Open Access Journals (Sweden)

    Mohammed Mouhib

    2017-12-01

    Full Text Available An automatic control system is one of the most important parts of an irradiation facility. The level of this control is always maintained to comply with safety procedures during routine work in this field. Also sometimes it is limited to the minimum level of regulation required due to economical aspects; some commercial systems are generally made by manufacturers of industrial facilities and considered affordable by irradiators. In some cases specific irradiation facilities tailor their control systems to their needs. For this kind of irradiator the control system can be developed and upgraded according to personal and industrial experiences. These upgrading procedures are also used by others to develop their systems. The objective of this paper is to share a local experience in upgrading security, safety systems and the use of cobalt-60 for the irradiator. It is a composite experiment at SIBO INRA/Tangier, Morocco and concerns the: (i upgrade of cobalt-60 in a temporary pool in the SIBO irradiator in Tangier. This operation was conducted in collaboration with the International Atomic Energy Agency (IAEA and was a success story of 2014 according to the general conference of IAEA; (ii safety and technical upgrade of the system in the SIBO irradiator made in collaboration with IAEA; (iii installation and upgrade of the security system in accordance with the Global Threat Reduction Programme (GTRP to reduce the threat of a Radiological Dispersal Device (RDD in collaboration with The United States Department of Energy’s National Nuclear Security Administration (NNSA.

  1. Upgrading of TREAT experimental capabilities

    International Nuclear Information System (INIS)

    Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

    1982-01-01

    The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system

  2. Prototype application for the control and debugging of CMS upgrade projects

    CERN Document Server

    Mills-Howell, Dominic

    2016-01-01

    Following the high-luminosity upgrades of the LHC, many subsystems of the CMS experiment require upgrading and others are using the LHC shutdowns as an opportunity to improve performance. The upgrades, themselves, have served to highlight the exigency to attack problems that were previously unaddressed. One such problem is the need for a tool that allows the users to easily monitor, debug, and test custom hardware. Such a tool could be abstracted to work, in theory, with various hardware devices. In addition to having the added benefit of being able to support future hardware, and maintaining parallel operations with the remaining control software.

  3. System upgrade and its complications in patients with a single lead atrial pacemaker

    DEFF Research Database (Denmark)

    Kirkfeldt, Rikke Esberg; Andersen, Henning Rud; Nielsen, Jens Cosedis

    2013-01-01

    To investigate the indications for system upgrade with single lead atrial pacing (AAIR), complications associated with these re-interventions, and possible predictors for system upgrade among patients included in the Danish Multicenter Randomized Trial on AAIR vs. dual-chamber pacing (DDDR) in si...

  4. Status of the Tandem Mirror Experiment-Upgrade (TMX-U) diagnostic system

    International Nuclear Information System (INIS)

    Coutts, G.W.; Coffield, F.E.; Hornady, R.S.

    1983-01-01

    This paper presents the current status of the Tandem Mirror Experiment-Upgrade (TMX-U) diagnostics system. For the initial instruments active on TMX-U, the expansions or upgrades that have been implemented are outlined. For the newly added systems, more implementation details are presented

  5. Upgrade of the DIII-D RF systems

    International Nuclear Information System (INIS)

    Callis, R.W.; Cary, W.P.; O'Neill, R.C.

    1995-10-01

    The DIII-D Advanced Tokamak Program requires the ability to modify the current density profile for extended time periods in order to achieve the improved plasma conditions now achieved with transient means. To support this requirement DIII-D has just completed a major addition to its ion cyclotron range of frequency (ICRF) systems. This upgrade project added two new fast wave current drive (FWCD) systems, with each system consisting of a 2 MW, 30 to 120 MHz transmitter, an all ceramic insulated transmission line, and water-cooled four-strap antenna. With this addition of 4 MW of FWCD power to the original 2 MW, 30 to 60 MHz capability, experiments can be performed with centrally localized current drive enhancement. For off-axis current modification, plans are in place to add 110 GHz electron cyclotron heating (ECH) power to DIII-D. Initially, 3 MW of power will be available with plans to increase the power to 6 MW and to 10 MW

  6. LHCb : The LHCb trigger system and its upgrade

    CERN Multimedia

    Dziurda, Agnieszka

    2015-01-01

    The current LHCb trigger system consists of a hardware level, which reduces the LHC inelastic collision rate of 30 MHz to 1 MHz, at which the entire detector is read out. In a second level, implemented in a farm of 20k parallel-processing CPUs, the event rate is reduced to about 5 kHz. We review the performance of the LHCb trigger system during Run I of the LHC. Special attention is given to the use of multivariate analyses in the High Level Trigger. The major bottleneck for hadronic decays is the hardware trigger. LHCb plans a major upgrade of the detector and DAQ system in the LHC shutdown of 2018, enabling a purely software based trigger to process the full 30 MHz of inelastic collisions delivered by the LHC. We demonstrate that the planned architecture will be able to meet this challenge. We discuss the use of disk space in the trigger farm to buffer events while performing run-by-run detector calibrations, and the way this real time calibration and subsequent full event reconstruction will allow LHCb to ...

  7. Upgrading Planning and Executive Strategy for Reactor Protection System and Relative Equipment in Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jiang Zuyue

    2010-01-01

    Qinshan Nuclear Power Plant (QNPP) is the first nuclear power plant in China which completed the reactor protection system (RPS) upgrading with new digital safety instrumentation and control (I and C) platform instead of original analog system. At the same time,the nuclear instrumentation system (NIS) was upgraded with the same digital I and C platform. For adapting QNPP's actual engineering situation,the upgrading planning was taken by comprehensively investigating current development and application of digital safety I and C platform in the worldwide scope and by reviewing plant's original systems operation history. The project executive strategy-QNPP's leading role with necessary overseas cooperation and internal technical supports as great as possible, was determined. Some significant factors might influence and restrict the RPS and relative equipment upgrading executive actions in an operating NPP were analyzed.Finally, the engineering feasibility was briefly assessed to recognize the anticipated issues and difficulties and to prepare the relative solutions in advance for the purpose of ensuring the RPS upgrading objectives completely realized. (authors)

  8. Future of the CMS Muon System Upgrades and Aging

    CERN Document Server

    Pilot, Justin Robert

    2016-01-01

    The CMS detector currently includes three different muon detector types drift tubes (DT) in the central region, cathode strip chambers (CSC) in the forward regions, and resistive plate chambers (RPC) in both the forward and central regions. Several upgrade projects are planned to maintain high data-taking efficiency with the planned running conditions for the high-luminosity upgrade of the LHC. These upgrades are designed to ensure detector longevity and increase redundancy, while mitigating rate increases and retaining sensitivity to phyics processes. This involves changes to electronics and infrastructure of existing detectors, and adding new detectors in the forward region of the CMS experiment. Plans for each of the muon subsystems are described here in the context of the Phase-II upgrade schedule of the CMS experiment.

  9. The Hybrid Integrated Circuit of the ALICE Inner Tracking System upgrade

    CERN Document Server

    Fiorenza, G; Pastore, C; Valentino, V

    2016-01-01

    The upgrade of the Inner Tracking System scheduled during the second long shutdown is an important milestone of the ALICE upgrade and it will provide a high improvement of its performances. In this contribution the smallest operator unit of the detector, the Hybrid Integrated Circuits, is presented.

  10. System upgrades to the DIII-D facility

    International Nuclear Information System (INIS)

    Kellman, A.G.

    2007-01-01

    Major upgrades to the DIII-D facility have been performed that significantly enhance the capability of both the DIII-D device and the entire facility. The most significant of these include the rotation of a neutral beam line, installation of a new lower divertor, and a significant set of new and enhanced diagnostics. The upgrades and initial results are presented in this paper

  11. LLNL Tandem Mirror Experiment (TMX) upgrade vacuum system

    International Nuclear Information System (INIS)

    Pickles, W.L.; Chargin, A.K.; Drake, R.P.

    1981-01-01

    TMX Upgrade is a large, tandem, magnetic-mirror fusion experiment with stringent requirements on base pressure (10 -8 torr), low H reflux from the first walls, and peak gas pressure (5 x 10 -7 torr) due to neutral beam gas during plasma operation. The 225 m 3 vacuum vessel is initially evacuated by turbopumps. Cryopumps provide a continuous sink for gases other than helium, deuterium, and hydrogen. The neutral beam system introduces up to 480 l/s of H or D. The hydrogen isotopes are pumped at very high speed by titanium sublimed onto two cylindrical radially separated stainless steel quilted liners with a total surface area of 540 m 2 . These surfaces (when cooled to about 80 0 K) provide a pumping speed of 6 x 10 7 l/s for hydrogen. The titanium getter system is programmable and is used for heating as well as gettering. The inner plasma liner can be operated at elevated temperatures to enhance migration of gases away from the surfaces close to the plasma. Glow discharge cleaning is part of the pumpdown procedure. The design features are discussed in conjunction with the operating procedures developed to manage the dynamic vacuum conditions

  12. Studies for the ALICE Inner Tracking System Upgrade

    CERN Document Server

    AUTHOR|(CDS)2079168; Musa, Luciano

    The ALICE experiment at the CERN LHC identifies D0 mesons via secondary-vertex reconstruction and topological cuts to reduce the corresponding combinatorial background in heavy-ion collisions. The D0 meson is produced promptly in initial, hard scatterings via the strong interaction or as feed-down from weakly decaying B hadrons. Within this thesis, a novel method for the separation of prompt and feed-down D0 mesons using cut variations was implemented and applied to data from p–Pb collisions at $\\sqrt(s_\\mathrm{NN})=5.02$ TeV. The effectiveness of the secondary-vertex reconstruction strongly depends on the performance and in particular the pointing resolution of the Inner Tracking System. The upgrade of the ALICE Inner Tracking System for the Long Shutdown 2 of the LHC in 2019/2020 will significantly improve its vertex-reconstruction and tracking capabilities. It will be equipped with Monolithic Active Pixel Sensors manufactured using the TowerJazz 180nm CMOS process on wafers with a high-resistivity epitax...

  13. Preliminary business plan: Plzen district heating system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The district heating system of the City of Plzen, Czech Republic, needs to have physical upgrades to replace aging equipment and to comply with upcoming environmental regulations. Also, its ownership and management are being changed as a result of privatization. As majority owner, the City has the primary goal of ensuring that the heating needs of its customers are met as reliably and cost-effectively as possible. This preliminary business plan is part of the detailed analysis (5 reports in all) done to assist the City in deciding the issues. Preparation included investigation of ownership, management, and technology alternatives; estimation of market value of assets and investment requirements; and forecasting of future cash flow. The district heating system consists of the Central Plzen cogeneration plant, two interconnected heating plants [one supplying both hot water and steam], three satellite heating plants, and cooperative agreements with three industrial facilities generating steam and hot water. Most of the plants are coal-fired, with some peaking units fired by fuel oil.

  14. Upgrade of the Super Proton Synchrotron Vertical Beam Dump System

    CERN Document Server

    Senaj, V; Vossenberg, E

    2010-01-01

    The vertical beam dump system of the CERN Super Proton Synchrotron (SPS) uses two matched magnets with an impedance of 2 W and a combined kick strength of 1.152 Tm at 60 kV supply voltage. For historical reasons the two magnets are powered from three 3 W pulse forming networks (PFN) through three thyratronignitron switches. Recently flashovers were observed at the entry of one of the magnets, which lead, because of the electrical coupling between the kickers, to a simultaneous breakdown of the pulse in both magnets. To improve the reliability an upgrade of the system was started. In a first step the radii of surfaces at the entry of the weak magnet were increased, and the PFN voltage was reduced by 4%; the kick strength could be preserved by reducing the magnet termination resistance by 10 %. The PFNs were protected against negative voltage reflections and their last cell was optimised. In a second step the two magnets will be electrically separated and powered individually by new 2 W PFNs with semiconductor ...

  15. Mechanical braking system for the pulsed power supply system of ASDEX Upgrade

    International Nuclear Information System (INIS)

    Käsemann, C.-P.; Huart, M.; Stobbe, F.; Goldstein, I.; Sigalov, A.; Sachs, E.; Perk, E.

    2013-01-01

    Highlights: ► Compact and innovative solution for dumping of large kinetic energy. ► Small mass of energy converter at the shaft due to circulating storage medium. ► Design of the active parts ensures flat torque/power characteristics. ► Also suitable for spending a great part of operating life in “Freewheeling” mode. -- Abstract: A few years ago, IPP reviewed the safety of the ASDEX Upgrade pulsed power supply system. Two critical sub-systems had been identified: The (electrical) braking system for the flywheel generators and the oil lubrication system for the shaft bearings. A simultaneous failure of these two systems may lead to severe damages and could have consequences for the safety of operating personnel. Therefore a second, independent braking possibility for every generator was stipulated. Especially the challenges adapting a dynamometer, originally designed for motor test benches, towards a plant safety system for generator EZ4 will be described in the paper. Further on, the paper will present the problems, implementing such a system into an existing installation, including the calculation of the required supporting structure, balancing of the extended shaft line and required water cooling and control. Finally it will report on the performance achieved during operation

  16. Mechanical braking system for the pulsed power supply system of ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Käsemann, C.-P., E-mail: c.p.kaesemann@ipp.mpg.de [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Huart, M. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Michel Huart Personal Coaching and Consulting, Georgenschwaigstraße 23 RG, 80807 München (Germany); Stobbe, F.; Goldstein, I.; Sigalov, A. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Sachs, E. [Siemens AG, Industrial Automation Systems, Gleiwitzer Straße 555, 90475 Nürnberg (Germany); Perk, E. [Piper Test and Measurement Ltd., The Barn, Bilsington, Ashford, Kent TN25 7JT, England (United Kingdom)

    2013-10-15

    Highlights: ► Compact and innovative solution for dumping of large kinetic energy. ► Small mass of energy converter at the shaft due to circulating storage medium. ► Design of the active parts ensures flat torque/power characteristics. ► Also suitable for spending a great part of operating life in “Freewheeling” mode. -- Abstract: A few years ago, IPP reviewed the safety of the ASDEX Upgrade pulsed power supply system. Two critical sub-systems had been identified: The (electrical) braking system for the flywheel generators and the oil lubrication system for the shaft bearings. A simultaneous failure of these two systems may lead to severe damages and could have consequences for the safety of operating personnel. Therefore a second, independent braking possibility for every generator was stipulated. Especially the challenges adapting a dynamometer, originally designed for motor test benches, towards a plant safety system for generator EZ4 will be described in the paper. Further on, the paper will present the problems, implementing such a system into an existing installation, including the calculation of the required supporting structure, balancing of the extended shaft line and required water cooling and control. Finally it will report on the performance achieved during operation.

  17. Commissioning and initial operation experience with ASDEX Upgrade's new real-time control and data acquisition

    International Nuclear Information System (INIS)

    Raupp, G.; Behler, K.; Cole, R.; Engelhardt, K.; Lohs, A.; Lueddecke, K.; Treutterer, W.; Neu, G.; Vijverberg, T.; Zasche, D.; Zehetbauer, Th.

    2006-01-01

    ASDEX Upgrade was equipped with a distributed real-time (RT) control and diagnostic system. Application processes can be freely mapped onto controllers. They communicate through RT data exchanged via a shared memory network. Processes run self-organized with a data-driven scheme, i.e. a process executes when all required data has become available and produced data drive other processes waiting for these. The process chain starts periodically through a time-synchronous cycle master process to deterministically execute closed-loop control. Generic processes were implemented for feedback of plasma position and shape, and for performance control with fuelling and heating systems, for evaluation and monitoring of plasma quantities and Tokamak components, and generation of reference values in RT. Upon commissioning the system was speed-optimized to run a 1.6 ms cycle. Methods to exchange data and time information in RT and operate distributed data-driven processes work efficiently and reliably. The ability to freely map processes to computing nodes and RT data to generic processes provides outstanding configurational flexibility for optimizing system performance or supporting in situ replay and simulation runs. In the computation of reference values in RT acting on underlying feedback controllers, demonstrated for soft-landing, we see great potential to counteract instabilities or optimize pulses

  18. Temperature control feedback loops for the linac upgrade side coupled cavities at Fermilab

    International Nuclear Information System (INIS)

    Crisp, J.

    1990-01-01

    The linac upgrade project at Fermilab will replace the last 4 drift-tube linac tanks with seven side coupled cavity strings. This will increase the beam energy from 200 to 400 MeV at injection into the Booster accelerator. The main objective of the temperature loop is to control the resonant frequency of the cavity strings. A cavity string will constant of 4 sections connected with bridge couplers driven with a 12 MW klystron at 805 MHz. Each section is a side coupled cavity chain consisting of 16 accelerating cells and 15 side coupling cells. For the linac upgrade, 7 full cavity strings will be used. A separate temperature control system is planned for each of the 28 accelerating sections, the two transition sections, and the debuncher section. The cavity strings will be tuned to resonance for full power beam loaded conditions. A separate frequency loop is planned that will sample the phase difference between a monitor placed in the end cell of each section and the rf drive. The frequency loop will control the set point for the temperature loop which will be able to maintain the resonant frequency through periods within beam or rf power. The frequency loop will need the intelligence required to determine under what conditions the phase error information is valid and the temperature set point should be adjusted. This paper will discuss some of the reason for temperature control, the implementation, and some of the problems encountered. An appendix contains some useful constants and descriptions of some of the sensor and control elements used. 13 figs

  19. Upgrade of the Inner Tracking System of ALICE

    CERN Document Server

    Kofarago, Monika

    2015-01-01

    The upgrade of the Inner Tracking System (ITS) of ALICE is planned for the second long shutdown of the LHC in 2019-2020. The ALICE physics program after the shutdown requires the ITS to have improved tracking capabilities and improved impact parameter resolution at very low transverse momentum, as well as a substantial increase in the readout rate. To fulfill these requirements the current ITS will be replaced by seven layers of Monolithic Active Pixel Sensors. The new detector will be moved as close as 23 mm to the interaction point and will have a significantly reduced material budget. Several prototypes of the sensor have been developed to test different aspects of the sensor design including prototypes with analog and digital readout, as well as small and final-size sensors. These prototypes have been thoroughly characterized both in laboratory tests and at test beam facilities including studies on the radiation hardness of the sensors. This contribution gives an overview of the current status of the rese...

  20. Experiences From Developing and Upgrading a Web-Based Surveillance System for Malaria Elimination in Cambodia.

    Science.gov (United States)

    Fu, Clementine; Lopes, Sérgio; Mellor, Steve; Aryal, Siddhi; Sovannaroth, Siv; Roca-Feltrer, Arantxa

    2017-06-14

    Strengthening the surveillance component is key toward achieving country-wide malaria elimination in Cambodia. A Web-based upgraded malaria information system (MIS) was deemed to essentially act as the central component for surveillance strengthening. New functionality (eg, data visualization) and operational (eg, data quality) attributes of the system received particular attention. However, building from the lessons learned in previous systems' developments, other aspects unique to Cambodia were considered to be equally important; for instance, feasibility issues, particularly at the field level (eg, user acceptability at various health levels), and sustainability needs (eg, long-term system flexibility). The Cambodian process of identifying the essential changes and critical attributes for this new information system can provide a model for other countries at various stages of the disease control and elimination continuum. Sharing these experiences not only facilitates the establishment of "best practices" but also accelerates global and regional malaria elimination efforts. In this article, Cambodia's experience in developing and upgrading its MIS to remain responsive to country-specific needs demonstrates the necessity for considering functionality, operationalization, feasibility, and sustainability of an information system in the context of malaria elimination. ©Clementine Fu, Sérgio Lopes, Steve Mellor, Siddhi Aryal, Siv Sovannaroth, Arantxa Roca-Feltrer. Originally published in JMIR Public Health and Surveillance (http://publichealth.jmir.org), 14.06.2017.

  1. Feedback controlled, reactor relevant, high-density, high-confinement scenarios at ASDEX Upgrade

    Science.gov (United States)

    Lang, P. T.; Blanken, T. C.; Dunne, M.; McDermott, R. M.; Wolfrum, E.; Bobkov, V.; Felici, F.; Fischer, R.; Janky, F.; Kallenbach, A.; Kardaun, O.; Kudlacek, O.; Mertens, V.; Mlynek, A.; Ploeckl, B.; Stober, J. K.; Treutterer, W.; Zohm, H.; ASDEX Upgrade Team

    2018-03-01

    One main programme topic at the ASDEX Upgrade all-metal-wall tokamak is development of a high-density regime with central densities at reactor grade level while retaining high-confinement properties. This required development of appropriate control techniques capable of coping with the pellet tool, a powerful means of fuelling but one which presented challenges to the control system for handling of related perturbations. Real-time density profile control was demonstrated, raising the core density well above the Greenwald density while retaining the edge density in order to avoid confinement losses. Recently, a new model-based approach was implemented that allows direct control of the central density. Investigations focussed first on the N-seeding scenario owing to its proven potential to yield confinement enhancements. Combining pellets and N seeding was found to improve the divertor buffering further and enhance the operational range accessible. For core densities up to about the Greenwald density, a clear improvement with respect to the non-seeding reference was achieved; however, at higher densities this benefit is reduced. This behaviour is attributed to recurrence of an outward shift of the edge density profile, resulting in a reduced peeling-ballooning stability. This is similar to the shift seen during strong gas puffing, which is required to prevent impurity influx in ASDEX Upgrade. First tests indicate that highly-shaped plasma configurations like the ITER base-line scenario, respond very well to pellet injection, showing efficient fuelling with no measurable impact on the edge density profile.

  2. Upgrade Analog Readout and Digitizing System for ATLAS TileCal Demonstrator

    CERN Document Server

    Tang, F; Anderson, K; Bohm, C; Hildebrand, K; Muschter, S; Oreglia, M

    2015-01-01

    The TileCal Demonstrator is a prototype for a future upgrade to the ATLAS hadron calorimeter when the Large Hadron Collider increases luminosity in year 2023 (HL-LHC). It will be used for functionality and performance tests. The Demonstrator has 48 channels of upgraded readout and digitizing electronics and a new digital trigger capability, but is backwards-compatible with the present detector system insofar as it also provides analog trigger signals. The Demonstrator is comprised of 4 identical mechanical mini-drawers, each equipped with up to 12 photomultipliers (PMTs). The on-detector electronics includes 45 Front-End Boards, each serving an individual PMT; 4 Main Boards, each to control and digitize up to 12 PMT signals, and 4 corresponding high-speed Daughter Boards serving as data hubs between on-detector and off-detector electronics. The Demonstrator is fully compatible with the present system, accepting ATLAS triggers, timing and slow control commands for the data acquisition, detector control, and de...

  3. Verification and Validation of Digitally Upgraded Control Rooms

    Energy Technology Data Exchange (ETDEWEB)

    Boring, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lau, Nathan [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    As nuclear power plants undertake main control room modernization, a challenge is the lack of a clearly defined human factors process to follow. Verification and validation (V&V) as applied in the nuclear power community has tended to involve efforts such as integrated system validation, which comes at the tail end of the design stage. To fill in guidance gaps and create a step-by-step process for control room modernization, we have developed the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE). This approach builds on best practices in the software industry, which prescribe an iterative user-centered approach featuring multiple cycles of design and evaluation. Nuclear regulatory guidance for control room design emphasizes summative evaluation—which occurs after the design is complete. In the GONUKE approach, evaluation is also performed at the formative stage of design—early in the design cycle using mockups and prototypes for evaluation. The evaluation may involve expert review (e.g., software heuristic evaluation at the formative stage and design verification against human factors standards like NUREG-0700 at the summative stage). The evaluation may also involve user testing (e.g., usability testing at the formative stage and integrated system validation at the summative stage). An additional, often overlooked component of evaluation is knowledge elicitation, which captures operator insights into the system. In this report we outline these evaluation types across design phases that support the overall modernization process. The objective is to provide industry-suitable guidance for steps to be taken in support of the design and evaluation of a new human-machine interface (HMI) in the control room. We suggest the value of early-stage V&V and highlight how this early-stage V&V can help improve the design process for control room modernization. We argue that there is a need to overcome two shortcomings of V&V in current practice

  4. Verification and Validation of Digitally Upgraded Control Rooms

    International Nuclear Information System (INIS)

    Boring, Ronald; Lau, Nathan

    2015-01-01

    As nuclear power plants undertake main control room modernization, a challenge is the lack of a clearly defined human factors process to follow. Verification and validation (V&V) as applied in the nuclear power community has tended to involve efforts such as integrated system validation, which comes at the tail end of the design stage. To fill in guidance gaps and create a step-by-step process for control room modernization, we have developed the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE). This approach builds on best practices in the software industry, which prescribe an iterative user-centered approach featuring multiple cycles of design and evaluation. Nuclear regulatory guidance for control room design emphasizes summative evaluation - which occurs after the design is complete. In the GONUKE approach, evaluation is also performed at the formative stage of design - early in the design cycle using mockups and prototypes for evaluation. The evaluation may involve expert review (e.g., software heuristic evaluation at the formative stage and design verification against human factors standards like NUREG-0700 at the summative stage). The evaluation may also involve user testing (e.g., usability testing at the formative stage and integrated system validation at the summative stage). An additional, often overlooked component of evaluation is knowledge elicitation, which captures operator insights into the system. In this report we outline these evaluation types across design phases that support the overall modernization process. The objective is to provide industry-suitable guidance for steps to be taken in support of the design and evaluation of a new human-machine interface (HMI) in the control room. We suggest the value of early-stage V&V and highlight how this early-stage V&V can help improve the design process for control room modernization. We argue that there is a need to overcome two shortcomings of V&V in current practice

  5. Upgrading of data acquisition software for centralized radiation monitoring system in Malaysian Nuclear Agency

    Energy Technology Data Exchange (ETDEWEB)

    Yussup, F., E-mail: nolida@nm.gov.my; Ibrahim, M. M., E-mail: maslina-i@nm.gov.my; Soh, S. C.; Hasim, H. [Instrumentation and Automation Centre, Technical Support Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia); Haris, M. F. [Information Technology Centre, Technical Support Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia); Azman, A. [Prototype and Development Centre, Technical Support Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia); Razalim, F. A. A.; Yapp, R. [Health Physics Group, Radiation Safety and Health Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia); Ramli, A. A. M. [Technical Support Division, Malaysian Nuclear Agency, Bangi, 43000 Kajang. Selangor (Malaysia)

    2016-01-22

    With the growth of technology, many devices and equipments can be connected to the network and internet to enable online data acquisition for real-time data monitoring and control from monitoring devices located at remote sites. Centralized radiation monitoring system (CRMS) is a system that enables area radiation level at various locations in Malaysian Nuclear Agency (Nuklear Malaysia) to be monitored centrally by using a web browser. The Local Area Network (LAN) in Nuclear Malaysia is utilized in CRMS as a communication media for data acquisition of the area radiation levels from radiation detectors. The development of the system involves device configuration, wiring, network and hardware installation, software and web development. This paper describes the software upgrading on the system server that is responsible to acquire and record the area radiation readings from the detectors. The recorded readings are called in a web programming to be displayed on a website. Besides the main feature which is acquiring the area radiation levels in Nuclear Malaysia centrally, the upgrading involves new features such as uniform time interval for data recording and exporting, warning system and dose triggering.

  6. Upgrading of data acquisition software for centralized radiation monitoring system in Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Yussup, F.; Ibrahim, M. M.; Soh, S. C.; Hasim, H.; Haris, M. F.; Azman, A.; Razalim, F. A. A.; Yapp, R.; Ramli, A. A. M.

    2016-01-01

    With the growth of technology, many devices and equipments can be connected to the network and internet to enable online data acquisition for real-time data monitoring and control from monitoring devices located at remote sites. Centralized radiation monitoring system (CRMS) is a system that enables area radiation level at various locations in Malaysian Nuclear Agency (Nuklear Malaysia) to be monitored centrally by using a web browser. The Local Area Network (LAN) in Nuclear Malaysia is utilized in CRMS as a communication media for data acquisition of the area radiation levels from radiation detectors. The development of the system involves device configuration, wiring, network and hardware installation, software and web development. This paper describes the software upgrading on the system server that is responsible to acquire and record the area radiation readings from the detectors. The recorded readings are called in a web programming to be displayed on a website. Besides the main feature which is acquiring the area radiation levels in Nuclear Malaysia centrally, the upgrading involves new features such as uniform time interval for data recording and exporting, warning system and dose triggering

  7. Upgrading PABX Infra System and Wiring for Communication System in Selected Block

    International Nuclear Information System (INIS)

    Sahirudden Mohd Nor; Khairiah Yazid; Lojius Lombigit; Zainuddin Jaafar; Abd Aziz Mhd Ramli

    2015-01-01

    Infra phone system in Nuclear Malaysia has been operating since its inception. Infra phone system is used to enable the communications process run smoothly. There are two mains phone system which are mannex analog system in the main complex and MD110 systems in Dengkil complex. This system was responsibilities and monitored by Automation and Instrumentation Center, Technical Support Division. Infra phone system and its wiring in the main complexes have not been upgraded and there are a lot of faulty wiring. This phone system requires new wiring system with the addition of new buildings in Nuclear Malaysia. The system also requires new parts to ensure smooth communication system in future. (author)

  8. Safety philosophy in upgrading the EBR-II plant protection system

    International Nuclear Information System (INIS)

    Sackett, J.I.

    1976-01-01

    The EBR-II plant protection system (PPS) has been substantially modified, upgrading its performance to more fully comply with modern safety philosophy and criteria. The upgrading effort required that the total reactor system be evaluated for possible faults and that a PPS be designed to accommodate them. The result was deletion of a number of existing trip functions and upgrading of others. Particular attention was given to loss of primary pumping power and reactivity insertion events. The design and performance criteria for the PPS has been more firmly established, understanding of the PPS function has been improved and the reactor has been subjected to fewer spurious trips, improving operational reliability

  9. Automation and Upgrade of Thermal System for Large 38-Year Young Test Facility

    Science.gov (United States)

    Webb, Andrew

    2000-01-01

    The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38-years was one of the driving design factors for the size of the equipment. The installation was completed on-time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

  10. Automation and Upgrade of Thermal System for Large 38-Year-Young Test Facility

    Science.gov (United States)

    Webb, Andrew T.; Powers, Edward I. (Technical Monitor)

    2000-01-01

    The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38 years was one of the driving design factors for the size of the equipment. The installation was completed on time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

  11. Upgrading to a New Version of an ERP System

    DEFF Research Database (Denmark)

    Holst Riis, Philip; Schubert, Petra

    2012-01-01

    and interviews with practitioners. Grounded theory was used to analyze the data. The resulting theory illustrates the upgrade decision process from the perspective of ISVs and VARs respectively and from the perspective of the software ecosystem as a whole. The findings suggest that the interdependence...

  12. The upgrade for the data acquisition system of the KOTO detector

    Energy Technology Data Exchange (ETDEWEB)

    Tecchio, M., E-mail: tecchio@umich.edu [University of Michigan, Ann Arbor, MI (United States); Beechert, J.; Campbell, M. [University of Michigan, Ann Arbor, MI (United States); Huff, M. [Kenyon College, Gambier, OH (United States); Micallef, J.; Rymph, C.; Schamis, H.; Su, S. [University of Michigan, Ann Arbor, MI (United States); Xu, J. [Apple Inc., Cupertino, CA (United States)

    2016-07-11

    A major upgrade to the KOTO detector data acquisition system based on the ATCA standard is being considered. The ATCA standard provides a natural solution to the current KOTO constraints, including communication between boards and higher input and output bandwidth.

  13. The upgrade for the data acquisition system of the KOTO detector

    International Nuclear Information System (INIS)

    Tecchio, M.; Beechert, J.; Campbell, M.; Huff, M.; Micallef, J.; Rymph, C.; Schamis, H.; Su, S.; Xu, J.

    2016-01-01

    A major upgrade to the KOTO detector data acquisition system based on the ATCA standard is being considered. The ATCA standard provides a natural solution to the current KOTO constraints, including communication between boards and higher input and output bandwidth.

  14. Data analysis to evaluate the CPPF system in CMS trigger phase-I upgrade

    CERN Document Server

    CMS Collaboration

    2018-01-01

    The CMS Level-1 trigger upgrade system consists of several layers of electronics with a large number of homogeneous cards based on the Micro-TCA(uTCA) standard. The CPPF(Concentration Pre-Processing and Fan-out)system belongs to one of the electronic layers, covering the Muon RPC (Resistive plate chambers) Overlap and Endcap region, and provides preprocessing algorithm for track finding. It includes, in hardware, eight specially designed CPPF cards, one generic CMS card called AMC13, one commercial MCH card, and a Micro-TCA Shelf. Its functionality is realized with five firmware modules: TTC module, optical input module, optical output module, readout module, and a CORE module for cluster finding and transformation. In addition to the firmware functionality, online software is needed for controlling and monitoring each individual CPPF module and the whole CPPF system. This presentation will discuss the data analysis to evaluate the system.

  15. Upgrading of the KSU simulators with new digital I and C systems

    International Nuclear Information System (INIS)

    Randen, K.

    1997-01-01

    Nearly all Swedish nuclear power plants, 9 ABB Atom BWRs and 3 Westinghouse PWRs in total, are presently in various stages of modernizing their I and C systems. This includes also major changes to the main control room with the introduction of large numbers of workstations for soft process control and supervision. These modernization programs also have implications on the seven plant specific full-scope simulators used at the KSU Nuclear Training and Safety Center for operator training. The utilities are considering this training to be an integral part of their programs and have requested KSU to provide training of operators before commissioning of the new equipment in the plants. There is also a request to validate modified operating procedures with the new I and C systems integrated into the simulators. Since the utilities are using different vendors, KSU is now Working with equipment from three vendors in the upgrading of the simulators. (author)

  16. Systems Integration: RNAV and the Upgraded Third Generation System.

    Science.gov (United States)

    1976-12-01

    III~~f I I iI~ ~~~~~~~~~~~~~~ -~~;tit I l i j I l i l ~~~~~~~~~~~~~~~~ ~~~~ I ~~~~~~~ _ PRE FACE The Systems Researc h and Deve lopment Service of the... researc Ii a rid o the rw i so ) I)u1’~I is hed by t he Off i n n ’ 01’ th e Ad ii i iii I s I i a to r [4 1] on On.’ lobe r 1 ‘1 .1 )/S . The resul t i n...body aircra ft will be manufactured primarily for the domestic market , thus the total non- domestic 3ESB count was presumed to be constan t . • The

  17. Commissioning and integration testing of the DAQ system for the CMS GEM upgrade

    CERN Document Server

    Castaneda Hernandez, Alfredo Martin

    2017-01-01

    The CMS muon system will undergo a series of upgrades in the coming years to preserve and extend its muon detection capabilities during the High Luminosity LHC.The first of these will be the installation of triple-foil GEM detectors in the CMS forward region with the goal of maintaining trigger rates and preserving good muon reconstruction, even in the expected harsh environment.In 2017 the CMS GEM project is looking to achieve a major milestone in the project with the installation of 5 super-chambers in CMS; this exercise will allow for the study of services installation and commissioning, and integration with the rest of the subsystems for the first time. An overview of the DAQ system will be given with emphasis on the usage during chamber quality control testing, commissioning in CMS, and integration with the central CMS system.

  18. Experiences with the upgraded SKP system during refuelling Paks nuclear power plant

    International Nuclear Information System (INIS)

    Baranyai, A.; Hetzmann, A.

    1997-01-01

    In order to control the neutron flux during the refueling period, new measuring chains were developed and put into operation by the experts of KFKI-RegTron Co., Ltd. and the Paks Nuclear Power Plant with the purpose of partially substituting the original Refuelling Neutron Monitoring system (SKP) of WWER-440 reactor units. The modified monitoring system processes the signals of detectors located in channels outside the core. The outputs of measurement amplifiers equipped with up-to-date electronics fit in the original system perfectly. Use of the out-of-core measuring technique confirmed the preliminary expectations: interference sensitivity has decreased, the neutron/gamma ration increased and refueling time has become shorter by one to one-and-a-half day. The paper details the reasons for upgrading, the essence of utilized solutions and the operational experience. (author)

  19. Upgrading the information system for real estate managers

    OpenAIRE

    Lušin, Boštjan

    2009-01-01

    Scope of the Thesis theme is the development of applications. Thesis describes the life cycles of waterfall model development for applications and the different phases of the model. The application was developed in Clarion development environment so thesis starts with description of application called WinISU and its features. Then its followed by descriptions of phases in waterfall model, starting with taking requirements for upgrade of application and followed by design phase and implem...

  20. Reactor control system. PWR

    International Nuclear Information System (INIS)

    2009-01-01

    At present, 23 units of PWR type reactors have been operated in Japan since the start of Mihama Unit 1 operation in 1970 and various improvements have been made to upgrade operability of power stations as well as reliability and safety of power plants. As the share of nuclear power increases, further improvements of operating performance such as load following capability will be requested for power stations with more reliable and safer operation. This article outlined the reactor control system of PWR type reactors and described the control performance of power plants realized with those systems. The PWR control system is characterized that the turbine power is automatic or manually controlled with request of the electric power system and then the nuclear power is followingly controlled with the change of core reactivity. The system mainly consists of reactor automatic control system (control rod control system), pressurizer pressure control system, pressurizer water level control system, steam generator water level control system and turbine bypass control system. (T. Tanaka)

  1. Innovative low-mass cooling systems for the ALICE ITS Upgrade detector at CERN

    OpenAIRE

    Gomez Marzoa, Manuel; Thome, John

    2016-01-01

    The Phase-1 upgrade of the LHC to full design luminosity, planned for 2019 at CERN, requires the modernisation of the experiments around the accelerator. The Inner Tracking System (ITS), the innermost detector at the ALICE experiment, will be upgraded by replacing the current apparatus by new silicon pixels arranged in 7 cylindrical layers. Each layer is composed by multiple independent modules, named staves, which provide mechanical support and cooling to the chips. This thesis aims to devel...

  2. Tri-axial square Helmholtz coil system at the Alibag Magnetic Observatory: upgraded to a magnetic sensor calibration facility

    Science.gov (United States)

    Mahavarkar, Prasanna; John, Jacob; Dhapre, Vijay; Dongre, Varun; Labde, Sachin

    2018-04-01

    A tri-axial square Helmholtz coil system for the study of palaeomagnetic studies, manufactured by GEOFYZIKA (former Czechoslovakia), was successfully commissioned at the Alibag Magnetic Observatory (IAGA code: ABG) in the year 1985. This system was used for a few years, after which the system encountered technical problems with the control unit. Rectification of the unit could not be undertaken, as the information document related to this system was not available, and as a result the system had been lying in an unused state for a long time, until 2015, when the system was recommissioned and upgraded to a test facility for calibrating the magnetometer sensors. We have upgraded the system with a constant current source and a data-logging unit. Both of these units have been designed and developed in the institute laboratory. Also, re-measurements of the existing system have been made thoroughly. The upgraded system is semi-automatic, enabling non-specialists to operate it after a brief period of instruction. This facility is now widely used at the parent institute and external institutions to calibrate magnetometers and it also serves as a national facility. Here the design of this system with the calibration results for the space-borne fluxgate magnetometers is presented.

  3. Tri-axial square Helmholtz coil system at the Alibag Magnetic Observatory: upgraded to a magnetic sensor calibration facility

    Directory of Open Access Journals (Sweden)

    P. Mahavarkar

    2018-04-01

    Full Text Available A tri-axial square Helmholtz coil system for the study of palaeomagnetic studies, manufactured by GEOFYZIKA (former Czechoslovakia, was successfully commissioned at the Alibag Magnetic Observatory (IAGA code: ABG in the year 1985. This system was used for a few years, after which the system encountered technical problems with the control unit. Rectification of the unit could not be undertaken, as the information document related to this system was not available, and as a result the system had been lying in an unused state for a long time, until 2015, when the system was recommissioned and upgraded to a test facility for calibrating the magnetometer sensors. We have upgraded the system with a constant current source and a data-logging unit. Both of these units have been designed and developed in the institute laboratory. Also, re-measurements of the existing system have been made thoroughly. The upgraded system is semi-automatic, enabling non-specialists to operate it after a brief period of instruction. This facility is now widely used at the parent institute and external institutions to calibrate magnetometers and it also serves as a national facility. Here the design of this system with the calibration results for the space-borne fluxgate magnetometers is presented.

  4. Development of Regulatory Documents for Creation (Upgrade) of Physical Protection Systems under the Russian/American MPC and A Program

    International Nuclear Information System (INIS)

    Izmaylov, Alexandr V.; Babkin, Vladimir; Kurov, Valeriy; Piskarev, Alexander; O'Brien, Patricia E.; Wright, Troy L.; Schlegel, Stephen C.; Hazel, Michael J.; Miller, Daniel R.; Tuttle, John D.; Kovchegin, Dmitry

    2009-01-01

    The development of new or the upgrade of existing physical protection systems (PPS) for nuclear facilities involves a multi-step and multidimensional process. The process consists of conceptual design, design, and commissioning stages. The activities associated with each of these stages are governed by Russian government and agency regulations. To ensure a uniform approach to development or upgrading of PPS at Russian nuclear facilities, the development of a range of regulatory and methodological documents is necessary. Some issues of PPS development are covered by the regulatory documents developed by Rosatom, as well as other Russian agencies with nuclear facilities under their control. This regulatory development has been accomplished as part of the U.S.-Russian MPC and A cooperation or independently by the Russian Federation. While regulatory coverage is extensive, there are a number of issues such as vulnerability analysis, effectiveness assessment, upgrading PPS, and protection of information systems for PPS that require additional regulations be developed. This paper reports on the status of regulatory coverage for PPS development or upgrade, and outlines a new approach to regulatory document development. It describes the evolutionary process of regulatory development through experience gained in the design, development and implementation of PPS as well as experience gained through the cooperative efforts of Russian and U.S. experts involved the development of MPC and A regulations.

  5. Reactive Power Support of Electrical Vehicle Charging Station Upgraded with Flywheel Energy Storage System

    DEFF Research Database (Denmark)

    SUN, BO; Dragicevic, Tomislav; Savaghebi, Mehdi

    2015-01-01

    Electrical vehicles (EVs) are presenting increasingly potential to replace the conventional fossil fuel based vehicles due to environmental friendly characteristic. Accordingly, Charging Stations (CS), as an intermediate between grid and large numbers of EVs, are supposed to have more critical...... influence on future smart transportation network. This paper explores an off-board charging station upgraded with flywheel energy storage system that could provide a reactive power support to the grid utility. A supervisory control scheme based on distributed bus signaling is proposed to coordinate...... the operation of each component in the system. As a result, the charging station could supply the reactive power support to the utility grid without compromising the charging algorithm and preserve the battery’s lifetime. Finally, the real-time simulation results based on dSPACE1006 verifies the proposed...

  6. Digital control computer upgrade at the Cernavoda NPP simulator

    International Nuclear Information System (INIS)

    Ionescu, T.

    2006-01-01

    The Plant Process Computer equips some Nuclear Power Plants, like CANDU-600, with Centralized Control performed by an assembly of two computers known as Digital Control Computers (DCC) and working in parallel for safely driving of the plan at steady state and during normal maneuvers but also during abnormal transients when the plant is automatically steered to a safe state. The Centralized Control means both hardware and software with obligatory presence in the frame of the Full Scope Simulator and subject to changing its configuration with specific requirements during the plant and simulator life and covered by this subsection

  7. Study on upgrade on nuclear control related open source information website

    International Nuclear Information System (INIS)

    Kim, H. T.; Park, S. S.; Park, W. S.; Choi, Y. M.

    2002-01-01

    The open source information relevant to the nuclear control is regularly collected, analyzed, and published to the three web sites by the Technology Center for Nuclear Control (TCNC) of the Korea Atomic Energy Research Institute (KAERI). These web sites are world-wide, KAERI-wide, and TCNC-wide, respectively. We are to upgrade the KAERI-wide website to the access-controlled world-wide web site with some additional functionality. In this research, the current status of the three nuclear control related open source information websites managed by the TCNC was introduced and methods for upgrading the KAERI-wide open source information website and associated information security technology were reviewed

  8. Upgrade of the cooling water temperature measures system for HLS

    International Nuclear Information System (INIS)

    Guo Weiqun; Liu Gongfa; Bao Xun; Jiang Siyuan; Li Weimin; He Duohui

    2007-01-01

    The cooling water temperature measures system for HLS (Hefei Light Source) adopts EPICS to the developing platform and takes the intelligence temperature cruise instrument for the front control instrument. Data of temperatures are required by IOCs through Serial Port Communication, archived and searched by Channel Archiver. The system can monitor the real-time temperatures of many channels cooling water and has the function of history data storage, and data network search. (authors)

  9. Digital upgrade of radiation-monitoring-system subcomponents

    International Nuclear Information System (INIS)

    Bohrisch, R.L

    1993-01-01

    This paper describes the experience of Southern California Edison (SCE) in upgrading an obsolete, analog, printed circuit board contain in most of the process and effluent radiation detectors at the San Onofre Nuclear Generating Station. The printed circuit board, which functions to produce a linear voltage and current that is proportional to the log of the radiation level, was reengineered by SCE with microprocessor-based digital technology and subjected to qualification testing, including seismic and environmental, for use in class I safety-related applications. The results, benefits, and disadvantages to this approach are discussed in this paper

  10. Los Alamos controlled air incinerator upgrade for TRU/mixed waste operations

    International Nuclear Information System (INIS)

    Vavruska, J.S.; Borduin, L.C.; Hutchins, D.A.; Warner, C.L.; Thompson, T.K.

    1989-01-01

    The Los Alamos Controlled Air Incinerator (CAI) is undergoing a major process upgrade to accept Laboratory-generated transuranic (TRU) and TRU mixed wastes on a production basis. In the interim,prior to the scheduled 1992 operation of a new on-site LLW/mixed waste incinerator, the CAI will also be accepting solid and liquid low-level mixed wastes. This paper describes major modifications that have been made to the process to enhance safety and ensure reliability for long-term, routine waste incineration operations. The regulatory requirements leading to operational status of the system are also briefly described. The CAI was developed in the mid-1970s as a demonstration system for volume reduction of TRU combustible solid wastes. It continues as a successful R and D system well into the 1980s during which incineration tests on a wide variety of radioactive and chemical waste forms were performed. In 1985, a DOE directive required Los Alamos to reduce the volume of its TRU waste prior to ultimate placement in the geological repository at the Waste Isolation Pilot Project (WIPP). With only minor modifications to the original process flowsheet, the Los Alamos CAI was judged capable of conversion to a TRU waste operations mode. 9 refs., 1 fig

  11. Upgrade to the Cryogenic Hydrogen Gas Target Monitoring System

    Science.gov (United States)

    Slater, Michael; Tribble, Robert

    2013-10-01

    The cryogenic hydrogen gas target at Texas A&M is a vital component for creating a secondary radioactive beam that is then used in experiments in the Momentum Achromat Recoil Spectrometer (MARS). A stable beam from the K500 superconducting cyclotron enters the gas cell and some incident particles are transmuted by a nuclear reaction into a radioactive beam, which are separated from the primary beam and used in MARS experiments. The pressure in the target chamber is monitored so that a predictable isotope production rate can be assured. A ``black box'' received the analog pressure data and sent RS232 serial data through an outdated serial connection to an outdated Visual Basic 6 (VB6) program, which plotted the chamber pressure continuously. The black box has been upgraded to an Arduino UNO microcontroller [Atmel Inc.], which can receive the pressure data and output via USB to a computer. It has been programmed to also accept temperature data for future upgrade. A new computer program, with updated capabilities, has been written in Python. The software can send email alerts, create audible alarms through the Arduino, and plot pressure and temperature. The program has been designed to better fit the needs of the users. Funded by DOE and NSF-REU Program.

  12. A CAMAC based knob controller for the LAMPF control system

    International Nuclear Information System (INIS)

    Smith, W.; Bjorklund, E.

    1987-01-01

    The control computer for the Los Alamos Meson Physics Facility (LAMPF) has been recently upgraded from an SEL-840 to a VAX 11/780 running the VMS operating system. As part of this upgrade, a CAMAC-based knob controller was developed for the new control system. The knobs allow the facility operators to have slew control over software selectable accelerator devices. An alphanumeric display associated with each knob monitors the progress of the selected device. This paper describes the system requirements for the new LAMPF knob controller, and the resulting hardware and software design

  13. ''Big Dee'' upgrade of the Doublet III diagnostic data acquisition computer system

    International Nuclear Information System (INIS)

    Mcharg, B.B.

    1983-01-01

    The ''Big Dee'' upgrade of the Doublet III tokamak facility will begin operation in 1986 with an initial quantity of data expected to be 10 megabytes per shot and eventually attaining 20-25 megabytes per shot. This is in comparison to the 4-5 megabytes of data currently acquired. To handle this greater quantity of data and to serve physics needs for significantly improved between-shot processing of data will require a substantial upgrade of the existing data acquisition system. The key points of the philosophy that have been adopted for the upgraded system to handle the greater quantity of data are (1) preserve existing hardware, (2) preserve existing software; (3) configure the system in a modular fashion; and (4) distribute the data acquisition over multiple computers. The existing system using ModComp CLASSIC 16 bit minicomputers is capable of handling 5 megabytes of data per shot

  14. Big Dee upgrade of the Doublet III diagnostic data acquisition computer system

    International Nuclear Information System (INIS)

    McHarg, B.B. Jr.

    1983-12-01

    The Big Dee upgrade of the Doublet III tokamak facility will begin operation in 1986 with an initial quantity of data expected to be 10 megabytes per shot and eventually attaining 20 to 25 megabytes per shot. This is in comparison to the 4 to 5 megabytes of data currently acquired. To handle this greater quantity of data and to serve physics needs for significantly improved between-shot processing of data will require a substantial upgrade of the existing data acquisition system. The key points of the philosophy that have been adopted for the upgraded system to handle the greater quantity of data are (1) preserve existing hardware; (2) preserve existing software; (3) configure the system in a modular fashion; and (4) distribute the data acquisition over multiple computers. The existing system using ModComp CLASSIC 16 bit minicomputers is capable of handling 5 megabytes of data per shot

  15. Modernization of control system using the digital control system

    International Nuclear Information System (INIS)

    Carrasco, J. A.; Fernandez, L.; Jimenez, A.

    2002-01-01

    Nowadays, all plant automation tendencies are based on the use of Digital Control System. In big industrial plants the control systems employed are Distributed Control Systems (DCS). The addition of these systems in nuclear power plants,implies an important adaptation process, because most of them were installed using analog control systems. This paper presents the objectives and the first results obtained, in a modernization project, focused in obtaining an engineering platform for making test and analysis of changes prior to their implementation in a nuclear plant. Modernization, Upgrade, DCS, Automation, Simulation, Training. (Author)

  16. Upgrade of the computer-based information systems on USNRC simulators

    International Nuclear Information System (INIS)

    Griffin, J.I.

    1998-01-01

    In late 1995, the U.S. Nuclear Regulatory Commission (USNRC) began a project to upgrade the computer-based information systems on its BWR/6 and BandW Simulators. The existing display generation hardware was very old and in need of replacement due to difficulty in obtaining spare parts and technical support. In addition, the display systems used currently each require a SEL 32/55 computer system, which is also obsolete, running the Real Time Monitor (RTM) operating system. An upgrade of the display hardware and display generation systems not only solves the problem of obsolescence of that equipment but also allows removal of the 32/55 systems. These computers are used only to support the existing display generation systems. Shortly after purchase of the replacement equipment, it was learned that the vendor was no longer going to support the methodology. Instead of implementing an unsupported concept, it was decided to implement the display systems upgrades using the Picasso-3 UIMS (User Interface Management System) and the purchased hardware. This paper describes the upgraded display systems for the BWR/6 and BandW Simulators, including the design concept, display development, hardware requirements, the simulator interface software, and problems encountered. (author)

  17. Some aspects of digital I and C and digital human-system interface upgrades in nuclear power plants

    International Nuclear Information System (INIS)

    Mandic, D.

    2005-01-01

    Digital I and C technology introduces some new terms and new processes like software life cycle, process computer configuration control, digital human-system interface (HSI), software V and V (Verification and Validation), software common mode failure potential, software documentation, etc. Based on the experience from NEK, and other NPPs and published reports from other organizations, this paper sheds light on challenging tasks related to some aspects of the digital I and C upgrades and especially the NPP MCR/MCB HSI (Nuclear Power Plant Main Control Room / Main Control Board Human-System Interface) upgrade. The Ref. [1], EPRI Report TR-1008122 was used as a guidance to analyze original NEK MCR/MCB HSI design (1970s), to describe migration from the original MCR/MCB HSI design to the 2005 AS-BUILT status and to propose the authors vision for the key planning aspects for I and C upgrades and MCR modernization. This paper submits the justified proposal for the endpoint vision and the migration path applicable to NEK MCR/MCB HSI modernization, as well as some of the possible risks and lessons learned. (author)

  18. Krsko NPP Quality Assurance Plan Application to Nuclear Safety Upgrade Projects (PCFV System and PAR System)

    International Nuclear Information System (INIS)

    Biscan, Romeo; Fifnja, Igor

    2014-01-01

    Nuklearna Elektrarna Krsko (NEK) has undertaken Nuclear Safety Upgrade Projects as a safety improvement driven by the lessons learned from the Fukushima-Daiichi Accident. Among other projects, new modification 1008-VA-L Passive Containment Filtered Vent (PCFV) System has been installed which acts as the last barrier minimizing the release of radioactive material into the environment in case of failure of all safety systems, and to insure containment integrity during beyond design basis accidents (BDBA). In addition, modification 1002-GH-L Severe Accident Hydrogen Control System (PAR) has been implemented to prevent and mitigate the consequences of explosive gas generation (hydrogen and carbon monoxide) in case of reactor core melting. To ensure containment integrity for all design basis accidents (DBA) and BDBA conditions, NEK has eliminated existing safety-related electrical recombiners, replaced them with two safety-related passive autocatalytic recombiners (PARs) and added 20 new PARs designed for the BDBA conditions. Krsko NPP Quality Assurance Plan has been applied to Nuclear Safety Upgrade Projects (PCFV System and PAR System) through the following activities: · Internal audit of modification process was performed. · Supplier audits were performed to evaluate QA program efficiency of the main design organization and engineering organizations. · Evaluation and approval of Suppliers were performed. · QA engineer was involved in the review and approval of 1008-VA-L and 1002-GH-L modification documentation (Conceptual Design Package, Design Modification Package, Installation Package, Field Design Change Request, Problem/Deficiency Report, and Final Documentation Package). · Purchasing documentation for modifications 1008-VA-L and 1002-GH-L (technical specifications, purchase orders) has been verified and approved by QA. · QA and QC engineers were involved in oversight of production and testing of the new 1008-VA-L and 1002-GH-L plant components.

  19. Modification and upgradation of corrosion fatigue testing system

    International Nuclear Information System (INIS)

    Farooq, A.; Qamar, R.

    2006-08-01

    Stress Corrosion Cracking (SCC) and Corrosion Fatigue (CF) are important tests which are performed to check the integrity of structural materials operating in different environments, such as nuclear power system, steam and gas turbines, aircraft marine structure, pipelines and bridges. To establish the environmental testing facility on laboratory scale, NMD acquired a computerized (286 Based PC) electromechanical testing machine from M/S CorTest, USA. This machine was commissioned at NMD in 1989. Since then it has been utilized to test and qualify the materials provided by different establishments of PAEC for SCC and CF behavior. However, in October 2004, computer attached to the machine was corrupted and became out of order. Users were handicapped because there was no any alternate system i.e. Manual control tower to operate the machine. Then users approached to Computer Division to investigate the malfunctioning at the computer. Therefore, upon complete checkup of system, it was diagnosed that there was a serious problem in the hard disk and mother board of the computer. Much difficulty was faced in retrieving the application software from the obsolete 286 computer system. Then the basic aim was to replace the old computer with Pentium System. But with Pentium system application software was not working. Since we have already recovered full application software package including source programs, so all the seventeen programs has been thoroughly studied. Four programs had to be modified according to the new hardware. Now the new Pentium system with modified software has been interfaced with the machine. Machine was tested for the both types of above mentioned tests and compared with previous results. The performance of machine was confirmed satisfactory on the new setup. (author)

  20. UPGRADE FOR HARDWARE/SOFTWARE SERVER AND NETWORK TOPOLOGY IN INFORMATION SYSTEMS

    Directory of Open Access Journals (Sweden)

    Oleksii O. Kaplun

    2011-02-01

    Full Text Available The network modernization, educational information systems software and hardware updates problem is actual in modern term of information technologies prompt development. There are server applications and network topology of Institute of Information Technology and Learning Tools of National Academy of Pedagogical Sciences of Ukraine analysis and their improvement methods expound in the article. The article materials represent modernization results implemented to increase network efficiency and reliability, decrease response time in Institute’s network information systems. The article gives diagrams of network topology before upgrading and after finish of optimization and upgrading processes.

  1. Characterisation of the Photon Detection System for the LHCb RICH Detector Upgrade

    CERN Document Server

    AUTHOR|(CDS)2097582; D'Ambrosio, Carmelo; Easo, Sajan

    The LHCb Experiment will be upgraded during Long Shutdown II of the Large Hadron Collider (LHC) in 2019 and 2020. The goal of the upgrade is to efficiently use the increased instantaneous luminosity in LHC Run 3 and to collect data at the proton collision rate of 40 MHz. The Ring Imaging Cherenkov (RICH) particle identification detectors will be upgraded to perform in the new operating conditions with continuing reliability. The photon detection system will be replaced using multi-anode photomultiplier tubes (MaPMTs) and associated read-out electronics. The photon detection chain was studied at CERN using a pulsed laser to test the system under high event rates and high photon intensities. The behaviour of two types of MaPMTs which are foreseen for the upgrade is presented for varying rates and intensities, and different applied bias voltages. A simulation was created to model the photon detection chain using the Geant4 simulation toolkit. The RICH Upgrade test beam using 180 GeV positive hadrons from CERN SP...

  2. Technical Design Report for the Upgrade of the ALICE Inner Tracking System

    CERN Document Server

    Abelev, B; Adamová, D; Aggarwal, M M; Aglieri Rinella, G; Agnello, M; Agostinelli, A; Agrawal, N; Ahammed, Z; Ahmad, N; Ahmad Masoodi, A; Ahmed, I; Ahn, S U; Ahn, S A; Aimo, I; Aiola, S; Ajaz, M; Akindinov, A; Aleksandrov, D; Alessandro, B; Alexandre, D; Alici, A; Alkin, A; Alme, J; Alt, T; Altini, V; Altinpinar, S; Altsybeev, I; Alves Garcia Prado, C; Anderssen, E C; Andrei, C; Andronic, A; Anguelov, V; Anielski, J; Anticic, T; Antinori, F; Antonioli, P; Aphecetche, L; Appelshäuser, H; Arbor, N; Arcelli, S; Armesto, N; Arnaldi, R; Aronsson, T; Arsene, I C; Arslandok, M; Augustinus, A; Averbeck, R; Awes, T C; Azmi, M D; Bach, M; Badalà, A; Baek, Y W; Bagnasco, S; Bailhache, R; Bairathi, V; Bala, R; Baldisseri, A; Baltasar Dos Santos Pedrosa, F; Bán, J; Baral, R C; Barbera, R; Barile, F; Barnaföldi, G G; Barnby, L S; Barret, V; Bartke, J; Basile, M; Bastian Van Beelen, J; Bastid, N; Basu, S; Bathen, B; Batigne, G; Battistin, M; Batyunya, B; Batzing, P C; Baudot, J; Baumann, C; Bearden, I G; Beck, H; Bedda, C; Behera, N K; Belikov, I; Bellini, F; Bellwied, R; Belmont-Moreno, E; Bencedi, G; Benettoni, M; Benotto, F; Beole, S; Berceanu, I; Bercuci, A; Berdnikov, Y; Berenyi, D; Berger, M E; Bertens, R A; Berzano, D; Besson, A; Betev, L; Bhasin, A; Bhati, A K; Bhatti, A; Bhattacharjee, B; Bhom, J; Bianchi, L; Bianchi, N; Bianchin, C; Bielcík, J; Bielcíková, J; Bilandzic, A; Bjelogrlic, S; Blanco, F; Blau, D; Blume, C; Bock, F; Boehmer, F V; Bogdanov, A; Boggild, H; Bogolyubsky, M; Boldizsár, L; Bombara, M; Book, J; Borel, H; Borissov, A; Bornschein, J; Borshchov, V N; Bortolin, C; Bossú, F; Botje, M; Botta, E; Böttger, S; Braun-Munzinger, P; Breitner, T; Broker, T A; Browning, T A; Broz, M; Bruna, E; Bruno, G E; Budnikov, D; Buesching, H; Bufalino, S; Buncic, P; Busch, O; Buthelezi, Z; Caffarri, D; Cai, X; Caines, H; Caliva, A; Calvo Villar, E; Camerini, P; Canoa Roman, V; Carena, F; Carena, W; Cariola, P; Carminati, F; Casanova Díaz, A; Castillo Castellanos, J; Casula, E A R; Catanescu, V; Caudron, T; Cavicchioli, C; Ceballos Sanchez, C; Cepila, J; Cerello, P; Chang, B; Chapeland, S; Charvet, J L; Chattopadhyay, S; Chattopadhyay, S; Cherney, M; Cheshkov, C; Cheynis, B; Chibante Barroso, V; Chinellato, D D; Chochula, P; Chojnacki, M; Choudhury, S; Christakoglou, P; Christensen, C H; Christiansen, P; Chujo, T; Chung, S U; Cicalo, C; Cifarelli, L; Cindolo, F; Claus, G; Cleymans, J; Colamaria, F; Colella, D; Coli, S; Colledani, C; Collu, A; Colocci, M; Conesa Balbastre, G; Conesa del Valle, Z; Connors, M E; Contin, G; Contreras, J G; Cormier, T M; Corrales Morales, Y; Cortese, P; Cortés Maldonado, I; Cosentino, M R; Costa, F; Crochet, P; Cruz Albino, R; Cuautle, E; Cunqueiro, L; Dainese, A; Dang, R; Danu, A; Da Riva, E; Das, D; Das, I; Das, K; Das, S; Dash, A; Dash, S; De, S; Decosse, C; Delagrange, H; Deloff, A; Dénes, E; D'Erasmo, G; de Barros, G O V; De Caro, A; de Cataldo, G; de Cuveland, J; De Falco, A; De Gruttola, D; De Marco, N; De Pasquale, S; De Robertis, G; De Roo, K; de Rooij, R; Diaz Corchero, M A; Dietel, T; Divià, R; Di Bari, D; Di Liberto, S; Di Mauro, A; Di Nezza, P; Djuvsland, o; Dobrin, A; Dobrowolski, T; Domenicis Gimenez, D; Dönigus, B; Dordic, O; Dorheim, S; Dorokhov, A; Doziere, G; Dubey, A K; Dubla, A; Ducroux, L; Dulinski, W; Dupieux, P; Dutta Majumdar, A K; Ehlers III, R J; Elia, D; Engel, H; Erazmus, B; Erdal, H A; Eschweiler, D; Espagnon, B; Estienne, M; Esumi, S; Evans, D; Evdokimov, S; Eyyubova, G; Fabris, D; Faivre, J; Falchieri, D; Fantoni, A; Fasel, M; Fehlker, D; Feldkamp, L; Felea, D; Feliciello, A; Feofilov, G; Ferencei, J; Fernández Téllez, A; Ferreiro, E G; Ferretti, A; Festanti, A; Figiel, J; Figueredo, M A S; Filchagin, S; Finogeev, D; Fionda, F M; Fiore, E M; Fiorenza, G; Floratos, E; Floris, M; Foertsch, S; Foka, P; Fokin, S; Fragiacomo, E; Francescon, A; Franco, M; Frankenfeld, U; Fuchs, U; Furget, C; Fusco Girard, M; Gaardhoje, J J; Gagliardi, M; Gajanana, D; Gallio, M; Gangadharan, D R; Ganoti, P; Garabatos, C; Garcia-Solis, E; Gargiulo, C; Garishvili, I; Gerhard, J; Germain, M; Gheata, A; Gheata, M; Ghidini, B; Ghosh, P; Ghosh, S K; Gianotti, P; Giubilato, P; Giubellino, P; Gladysz-Dziadus, E; Glässel, P; Gomez, R; Gomez Marzoa, M; González-Zamora, P; Gorbunov, S; Görlich, L; Gotovac, S; Graczykowski, L K; Grajcarek, R; Greiner, L C; Grelli, A; Grigoras, A; Grigoras, C; Grigoriev, V; Grigoryan, A; Grigoryan, S; Grinyov, B; Grion, N; Grondin, D; Grosse-Oetringhaus, J F; Grossiord, J -Y; Grosso, R; Guber, F; Guernane, R; Guerzoni, B; Guilbaud, M; Gulbrandsen, K; Gulkanyan, H; Gunji, T; Gupta, A; Gupta, R; H Khan, K; Haake, R; Haaland, o; Hadjidakis, C; Haiduc, M; Hamagaki, H; Hamar, G; Hanratty, L D; Hansen, A; Harris, J W; Hartmann, H; Harton, A; Hatzifotiadou, D; Hayashi, S; Heckel, S T; Heide, M; Helstrup, H; Hennes, E; Herghelegiu, A; Herrera Corral, G; Hess, B A; Hetland, K F; Hicks, B; Hillemanns, H; Himmi, A; Hippolyte, B; Hladky, J; Hristov, P; Huang, M; Hu-Guo, C; Humanic, T J; Hutter, D; Hwang, D S; Igolkin, S; Ijzermans, P; Ilkaev, R; Ilkiv, I; Inaba, M; Incani, E; Innocenti, G M; Ionita, C; Ippolitov, M; Irfan, M; Ivanov, M; Ivanov, V; Ivanytskyi, O; Jacholkowski, A; Jadlovsky, J; Jahnke, C; Jang, H J; Janik, M A; Jayarathna, P H S Y; Jena, S; Jimenez Bustamante, R T; Jones, P G; Jung, H; Junique, A; Jusko, A; Kalcher, S; Kalinak, P; Kalweit, A; Kamin, J; Kang, J H; Kaplin, V; Kar, S; Karasu Uysal, A; Karavichev, O; Karavicheva, T; Karpechev, E; Kebschull, U; Keidel, R; Keil, M; Ketzer, B; Khan, M Mohisin; Khan, P; Khan, S A; Khanzadeev, A; Kharlov, Y; Kileng, B; Kim, B; Kim, D; Kim, D W; Kim, D J; Kim, J S; Kim, M; Kim, M; Kim, S; Kim, T; Kirsch, S; Kisel, I; Kiselev, S; Kisiel, A; Kiss, G; Klay, J L; Klein, J; Klein-Bösing, C; Kluge, A; Knichel, M L; Knospe, A G; Kobdaj, C; Kofarago, M; Köhler, M K; Kollegger, T; Kolojvari, A; Kondratiev, V; Kondratyeva, N; Konevskikh, A; Kovalenko, V; Kowalski, M; Kox, S; Koyithatta Meethaleveedu, G; Kral, J; Králik, I; Kramer, F; Kravcáková, A; Krelina, M; Kretz, M; Krivda, M; Krizek, F; Krus, M; Krymov, E B; Kryshen, E; Krzewicki, M; Kucera, V; Kucheriaev, Y; Kugathasan, T; Kuhn, C; Kuijer, P G; Kulakov, I; Kumar, J; Kurashvili, P; Kurepin, A; Kurepin, A B; Kuryakin, A; Kushpil, S; Kushpil, V; Kweon, M J; Kwon, Y; Ladron de Guevara, P; Lagana Fernandes, C; Lakomov, I; Langoy, R; Lara, C; Lardeux, A; Lattuca, A; La Pointe, S L; La Rocca, P; Lea, R; Lee, G R; Legrand, I; Lehnert, J; Lemmon, R C; Lenhardt, M; Lenti, V; Leogrande, E; Leoncino, M; León Monzón, I; Lesenechal, Y; Lévai, P; Li, S; Lien, J; Lietava, R; Lindal, S; Lindenstruth, V; Lippmann, C; Lisa, M A; Listratenko, O M; Ljunggren, H M; Lodato, D F; Loddo, F; Loenne, P I; Loggins, V R; Loginov, V; Lohner, D; Loizides, C; Lopez, X; López Torres, E; Lu, X -G; Luettig, P; Lunardon, M; Luo, J; Luparello, G; Luzzi, C; M Gago, A; M Jacobs, P; Ma, R; Maevskaya, A; Mager, M; Mahapatra, D P; Maire, A; Malaev, M; Maldonado Cervantes, I; Malinina, L; Mal'Kevich, D; Maltsev, N A; Malzacher, P; Mamonov, A; Manceau, L; Manko, V; Manso, F; Manzari, V; Mapelli, A; Marchisone, M; Mares, J; Margagliotti, G V; Margotti, A; Marín, A; Marin Tobon, C A; Markert, C; Marquard, M; Marras, D; Martashvili, I; Martin, N A; Martinengo, P; Martínez, M I; Martínez García, G; Martin Blanco, J; Martynov, Y; Mas, A; Masciocchi, S; Masera, M; Maslov, M; Masoni, A; Massacrier, L; Mastroserio, A; Mattiazzo, S; Matyja, A; Mayer, C; Mazer, J; Mazumder, R; Mazza, G; Mazzoni, M A; Meddi, F; Menchaca-Rocha, A; Mercado Pérez, J; Meres, M; Miake, Y; Mikhaylov, K; Milano, L; Milosevic, J; Mischke, A; Mishra, A N; Miskowiec, D; Mitu, C M; Mlynarz, J; Mohanty, B; Molnar, L; Mongelli, M; Montaño Zetina, L; Montes, E; Morando, M; Moreira De Godoy, D A; Morel, F; Moretto, S; Morreale, A; Morsch, A; Muccifora, V; Mudnic, E; Muhammad Bhopal, F; Muhuri, S; Mukherjee, M; Müller, H; Munhoz, M G; Murray, S; Musa, L; Musinsky, J; Nandi, B K; Nania, R; Nappi, E; Nattrass, C; Nayak, T K; Nazarenko, S; Nedosekin, A; Nicassio, M; Niculescu, M; Nielsen, B S; Nikolaev, S; Nikulin, S; Nikulin, V; Nilsen, B S; Noferini, F; Nomokonov, P; Nooren, G; Nyanin, A; Nystrand, J; Oeschler, H; Oh, S; Oh, S K; Okatan, A; Olah, L; Oleniacz, J; Oliveira Da Silva, A C; Onderwaater, J; Oppedisano, C; Ortiz Velasquez, A; Oskarsson, A; Otwinowski, J; Oyama, K; Pachmayer, Y; Pachr, M; Pagano, P; Paic, G; Painke, F; Pajares, C; Pal, S K; Palmeri, A; Panati, S; Pant, D; Pantano, D; Papikyan, V; Pappalardo, G S; Park, W J; Passfeld, A; Pastore, C; Patalakha, D I; Paticchio, V; Paul, B; Pawlak, T; Peitzmann, T; Pereira Da Costa, H; Pereira De Oliveira Filho, E; Peresunko, D; Pérez Lara, C E; Peryt, W; Pesci, A; Pestov, Y; Petagna, P; Petrácek, V; Petran, M; Petris, M; Petrovici, M; Petta, C; Pham, H; Piano, S; Pikna, M; Pillot, P; Pinazza, O; Pinsky, L; Piyarathna, D B; Ploskon, M; Planinic, M; Pluta, J; Pochybova, S; Podesta-Lerma, P L M; Poghosyan, M G; Pohjoisaho, E H O; Polichtchouk, B; Poljak, N; Pop, A; Porteboeuf-Houssais, S; Porter, J; Pospisil, V; Potukuchi, B; Prasad, S K; Preghenella, R; Prino, F; Protsenko, M A; Pruneau, C A; Pshenichnov, I; Puddu, G; Puggioni, C; Punin, V; Putschke, J; Qvigstad, H; Rachevski, A; Raha, S; Rak, J; Rakotozafindrabe, A; Ramello, L; Raniwala, R; Raniwala, S; Räsänen, S S; Rascanu, B T; Rasson, J E; Rathee, D; Rauf, A W; Razazi, V; Read, K F; Real, J S; Redlich, K; Reed, R J; Rehman, A; Reichelt, P; Reicher, M; Reidt, F; Renfordt, R; Reolon, A R; Reshetin, A; Rettig, F; Revol, J -P; Reygers, K; Riabov, V; Ricci, R A; Richert, T; Richter, M; Riedler, P; Riegler, W; Riggi, F; Rivetti, A; Rocco, E; Rodríguez Cahuantzi, M; Rodriguez Manso, A; Roed, K; Rogochaya, E; Rohni, S; Rohr, D; Röhrich, D; Romita, R; Ronchetti, F; Ronflette, L; Rosnet, P; Rossegger, S; Rossewij, M J; Rossi, A; Roudier, S; Rousset, J; Roy, A; Roy, C; Roy, P; Rubio Montero, A J; Rui, R; Russo, R; Ryabinkin, E; Ryabov, Y; Rybicki, A; Sacchetti, M; Sadovsky, S; Safarík, K; Sahlmuller, B; Sahoo, R; Sahu, P K; Saini, J; Salgado, C A; Salzwedel, J; Sambyal, S; Samsonov, V; Sanchez Castro, X; Sánchez Rodríguez, F J; sándor, L; Sandoval, A; Sano, M; Santagati, G; Santoro, R; Sarkar, D; Scapparone, E; Scarlassara, F; Scharenberg, R P; Schiaua, C; Schicker, R; Schipper, J D; Schmidt, C; Schmidt, H R; Schuchmann, S; Schukraft, J; Schulc, M; Schuster, T; Schutz, Y; Schwarz, K; Schweda, K; Scioli, G; Scomparin, E; Scott, P A; Scott, R; Segato, G; Seger, J E; Selyuzhenkov, I; Senyukhov, S; Seo, J; Serradilla, E; Sevcenco, A; Sgura, I; Shabetai, A; Shabratova, G; Shahoyan, R; Shangaraev, A; Sharma, N; Sharma, S; Shigaki, K; Shtejer, K; Sibiriak, Y; Siddhanta, S; Siemiarczuk, T; Silvermyr, D; Silvestre, C; Simatovic, G; Singaraju, R; Singh, R; Singha, S; Singhal, V; Sinha, B C; Sinha, T; Sitar, B; Sitta, M; Skaali, T B; Skjerdal, K; Smakal, R; Smirnov, N; Snellings, R J M; Snoeys, W; Sogaard, C; Soltz, R; Song, J; Song, M; Sooden, V; Soramel, F; Sorensen, S; Spacek, M; spalek, J; Spiriti, E; Sputowska, I; Spyropoulou-Stassinaki, M; Srivastava, B K; Stachel, J; Stan, I; Stefanek, G; Steinpreis, M; Stenlund, E; Steyn, G; Stiller, J H; Stocco, D; Stolpovskiy, M; Strmen, P; Suaide, A A P; Subieta Vasquez, M A; Sugitate, T; Suire, C; Suleymanov, M; suljic, M; Sultanov, R; sumbera, M; Sun, X; Susa, T; Symons, T J M; Szanto de Toledo, A; Szarka, I; Szczepankiewicz, A; Szymanski, M; Takahashi, J; Tangaro, M A; Tapia Takaki, J D; Tarantola Peloni, A; Tarazona Martinez, A; Tauro, A; Tejeda Muñoz, G; Telesca, A; Terrevoli, C; Ter Minasyan, A; Thäder, J; Thomas, D; Tieulent, R; Timmins, A R; Toia, A; Torii, H; Trubnikov, V; Trzaska, W H; Tsuji, T; Tumkin, A; Turchetta, R; Turrisi, R; Tveter, T S; Tymchuk, I T; Ulery, J; Ullaland, K; Uras, A; Usai, G L; Vajzer, M; Vala, M; Valencia Palomo, L; Valentino, V; Valin, I; Vallero, S; Vande Vyvre, P; Vannucci, L; Van Der Maarel, J; Van Hoorne, J W; van Leeuwen, M; Vargas, A; Varma, R; Vasileiou, M; Vasiliev, A; Vasta, P; Vechernin, V; Veldhoen, M; Velure, A; Venaruzzo, M; Vercellin, E; Vergara Limón, S; Verlaat, B; Vernet, R; Verweij, M; Vickovic, L; Viesti, G; Viinikainen, J; Vilakazi, Z; Villalobos Baillie, O; Vinogradov, A; Vinogradov, L; Vinogradov, Y; Virgili, T; Viyogi, Y P; Vodopyanov, A; Völkl, M A; Voloshin, K; Voloshin, S A; Volpe, G; von Haller, B; Vorobyev, I; Vranic, D; Vrláková, J; Vulpescu, B; Vyushin, A; Wagner, B; Wagner, J; Wagner, V; Wang, M; Wang, Y; Watanabe, D; Weber, M; Wessels, J P; Westerhoff, U; Wiechula, J; Wikne, J; Wilde, M; Wilk, G; Wilkinson, J; Williams, M C S; Windelband, B; Winn, M; Winter, M; Xiang, C; Yaldo, C G; Yamaguchi, Y; Yang, H; Yang, P; Yang, S; Yano, S; Yasnopolskiy, S; Yi, J; Yin, Z; Yoo, I -K; Yushmanov, I; Zaccolo, V; Zach, C; Zaman, A; Zampolli, C; Zaporozhets, S; Zarochentsev, A; Závada, P; Zaviyalov, N; Zbroszczyk, H; Zgura, I S; Zhalov, M; Zhang, F; Zhang, H; Zhang, X; Zhang, Y; Zhao, C; Zherebchevsky, V I; Zhou, D; Zhou, F; Zhou, Y; Zhu, H; Zhu, J; Zhu, X; Zichichi, A; Zimmermann, A; Zimmermann, M B; Zinovjev, G; Zoccarato, Y; Zynovyev, M; Zyzak, M; CERN. Geneva. The LHC experiments Committee; LHCC

    2014-01-01

    ALICE (A Large Ion Collider Experiment) is preparing a major upgrade of its experimental apparatus, planned for installation in the second long LHC shutdown (LS2) in the years 2018-2019. These plans are presented in the ALICE Upgrade Letter of Intent submitted to the LHCC in September 2012. A key element of the upgrade is the construction of a new, ultra-light, high-resolution Inner Tracking System based on monolithic pixel detectors. This Technical Design Report is an update of the Conceptual Design Report for the Upgrade of the ALICE Inner Tracking System, which was presented to the LHCC in September 2012. The primary focus of the ITS upgrade is on the improved performance for detection of heavy-flavour hadrons, and of thermal photons and low-mass di-electrons emitted by the QGP. The Conceptual Design Report demonstrated that it is possible to build a new silicon tracker with greatly improved features in terms of determination of the distance of closest approach to the primary vertex, tracking efficiency a...

  3. Status of the new multi-frequency ECRH system for ASDEX Upgrade

    DEFF Research Database (Denmark)

    Wagner, D.; Grünwald, G.; Leuterer, F.

    2008-01-01

    Currently, a new multi-frequency ECRH system is under construction at the ASDEX Upgrade tokamak experiment. This system employs, for the first time in a fusion device, multi-frequency gyrotrons, step-tunable in the range 105-140 GHz. The first two gyrotrons, working at 105 and 140 GHz, were...

  4. CRISPR-Cas systems: prokaryotes upgrade to adaptive immunity

    Science.gov (United States)

    Barrangou, Rodolphe; Marraffini, Luciano A.

    2014-01-01

    Summary Clustered Regularly Interspaced Short Palindromic Repeats (CRISPR), and associated proteins (Cas) comprise the CRISPR-Cas system, which confers adaptive immunity against exogenic elements in many bacteria and most archaea. CRISPR-mediated immunization occurs through the uptake of DNA from invasive genetic elements such as plasmids and viruses, followed by its integration into CRISPR loci. These loci are subsequently transcribed and processed into small interfering RNAs that guide nucleases for specific cleavage of complementary sequences. Conceptually, CRISPR-Cas shares functional features with the mammalian adaptive immune system, while also exhibiting characteristics of Lamarckian evolution. Because immune markers spliced from exogenous agents are integrated iteratively in CRISPR loci, they constitute a genetic record of vaccination events and reflect environmental conditions and changes over time. Cas endonucleases, which can be reprogrammed by small guide RNAs have shown unprecedented potential and flexibility for genome editing, and can be repurposed for numerous DNA targeting applications including transcriptional control. PMID:24766887

  5. Innovative low-mass cooling systems for the ALICE ITS Upgrade detector at CERN

    CERN Document Server

    Gomez Marzoa, Manuel

    The Phase-1 upgrade of the LHC to full design luminosity, planned for 2019 at CERN, requires the modernisation of the experiments around the accelerator. The Inner Tracking System (ITS), the innermost detector at the ALICE experiment, will be upgraded by replacing the current apparatus by new silicon pixels arranged in 7 cylindrical layers. Each layer is composed by multiple independent modules, named staves, which provide mechanical support and cooling to the chips. This thesis aims to develop and validate experimentally an ultra-lightweight stave cooling system for the ITS Upgrade. The moderate thermal requirements, with a nominal power density of 0.15 W/cm^2 and a maximum chip temperature of 30ºC, are counterweighted by extreme low-mass restrictions, obliging to resort to lightweight, non-metallic materials, such as carbon fibre-reinforced polymers and plastics. Novel lightweight stave concepts were developed and experimentally validated, meeting the thermal requirements with minimal material inventory. T...

  6. TU-G-BRD-02: Automated Systematic Quality Assurance Program for Radiation Oncology Information System Upgrades

    International Nuclear Information System (INIS)

    Zhang, B; Yi, B; Eley, J; Mutaf, Y; Rahman, S; D’Souza, W

    2015-01-01

    Purpose: To: (1) describe an independent, automated, systematic software-based protocol for verifying clinical data accuracy/integrity for mitigation of data corruption/loss risks following radiation oncology information system (ROIS) upgrades; and (2) report on application of this approach in an academic/community practice environment. Methods: We propose a robust approach to perform quality assurance on the ROIS after an upgrade, targeting four data sources: (1) ROIS relational database; (2) ROIS DICOM interface; (3) ROIS treatment machine data configuration; and (4) ROIS-generated clinical reports. We investigated the database schema for differences between pre-/post-upgrade states. Paired DICOM data streams for the same object (such as RT-Plan/Treatment Record) were compared between pre-/post-upgrade states for data corruption. We examined machine configuration and related commissioning data files for changes and corruption. ROIS-generated treatment appointment and treatment parameter reports were compared to ensure patient encounter and treatment plan accuracy. This protocol was supplemented by an end-to-end clinical workflow test to verify essential ROI functionality and integrity of components interfaced during patient care chain of activities. We describe the implementation of this protocol during a Varian ARIA system upgrade at our clinic. Results: We verified 1,638 data tables with 2.4 billion data records. For 222 under-treatment patients, 605 DICOM RT plans and 13,480 DICOM treatment records retrieved from the ROIS DICOM interface were compared, with no differences in fractions, doses delivered, or treatment parameters. We identified 82 new data tables and 78 amended/deleted tables consistent with the upgrade. Reports for 5,073 patient encounters over a 2-week horizon were compared and were identical to those before the upgrade. Content in 12,237 xml machine files was compared, with no differences identified. Conclusion: An independent QA

  7. TU-G-BRD-02: Automated Systematic Quality Assurance Program for Radiation Oncology Information System Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, B; Yi, B; Eley, J; Mutaf, Y; Rahman, S; D’Souza, W [University of Maryland School of Medicine, Baltimore, MD (United States)

    2015-06-15

    Purpose: To: (1) describe an independent, automated, systematic software-based protocol for verifying clinical data accuracy/integrity for mitigation of data corruption/loss risks following radiation oncology information system (ROIS) upgrades; and (2) report on application of this approach in an academic/community practice environment. Methods: We propose a robust approach to perform quality assurance on the ROIS after an upgrade, targeting four data sources: (1) ROIS relational database; (2) ROIS DICOM interface; (3) ROIS treatment machine data configuration; and (4) ROIS-generated clinical reports. We investigated the database schema for differences between pre-/post-upgrade states. Paired DICOM data streams for the same object (such as RT-Plan/Treatment Record) were compared between pre-/post-upgrade states for data corruption. We examined machine configuration and related commissioning data files for changes and corruption. ROIS-generated treatment appointment and treatment parameter reports were compared to ensure patient encounter and treatment plan accuracy. This protocol was supplemented by an end-to-end clinical workflow test to verify essential ROI functionality and integrity of components interfaced during patient care chain of activities. We describe the implementation of this protocol during a Varian ARIA system upgrade at our clinic. Results: We verified 1,638 data tables with 2.4 billion data records. For 222 under-treatment patients, 605 DICOM RT plans and 13,480 DICOM treatment records retrieved from the ROIS DICOM interface were compared, with no differences in fractions, doses delivered, or treatment parameters. We identified 82 new data tables and 78 amended/deleted tables consistent with the upgrade. Reports for 5,073 patient encounters over a 2-week horizon were compared and were identical to those before the upgrade. Content in 12,237 xml machine files was compared, with no differences identified. Conclusion: An independent QA

  8. Modernization of turbine control system and reactor control system in Almaraz 1 and 2

    International Nuclear Information System (INIS)

    Pulido, C.; Diez, J.; Carrasco, J. A.; Lopez, L.

    2005-01-01

    The replacement of the Turbine Control System and Reactor Control System are part of the Almaraz modernization program for the Instrumentation and Control. For these upgrades Almaraz has selected the Ovation Platform that provides open architecture and easy expansion to other systems, these platforms is highly used in many nuclear and thermal plants around the world. One of the main objective for this project were to minimize the impact on the installation and operation of the plant, for that reason the project is implemented in two phases, Turbine Control upgrade and Reactor Control upgrade. Another important objective was to increase the reliability of the control system making them fully fault tolerant to single failures. The turbine Control System has been installed in Units 1 and 2 while the Reactor Control System will be installed in 2006 and 2007 outages. (Author)

  9. Modernizing and Upgrading the Astrogeodetic Camera System for Determining Vertical Deflections

    Science.gov (United States)

    Albayrak, M.; Halicioglu, K.; Basoglu, B.; Ulug, R.; Ozludemir, M. T.; Deniz, R.

    2017-12-01

    The geoid is the equipotential surface of the Earth. Modeling the geoid with high accuracy is one of the critical issues in Geodesy. Development of geoid modeling is based on geodetic, gravimetric and astrogeodetic techniques. In order to reach the intended accuracy, deflection of the vertical (VD) components, which is obtained by the astrogeodetic techniques, can be used. VD is also very important for providing valuable information on the structure of Earth's gravity field. For this reason, astrogeodetic observations were essential gravity field observables and used for astrogeodetic geoid determinations. Scientists in several countries have developed modern instruments to measure vertical deflections. One of those instruments, namely Astro-geodetic Camera System (ACSYS) was developed in Turkey in 2015. The system components include a telescope, a Charged Coupled Device (CCD), two tiltmeters with the accuracy of 0.01 milliradians, a focuser, a single frequency GPS receiver and a substructure. The first version of the ACSYS is capable of determining astronomical coordinates with an accuracy of 0.2-0.3 arc sec, yet it has some limitations in observation duration. Because of the semi-automated mechanical design, leveling the system towards zenith was a time-consuming process. Since the beginning of 2016, the ACSYS has been modernized through the upgrade of the system with new technological components, hardware and software which is supported by The Scientific and Research Council of Turkey. Upgrade process includes the installation of a high-resolution tiltmeter with an accuracy of 1 nano-radians, implementation of a temperature compensating focuser and fully automatized substructure system. The components of the system are controlled by specially designed and integrated software. In the scope of the modernization studies, the project team has also been working on a unified real-time processing and control software for the ACSYS.v2. This study introduces the

  10. Upgrade of the AGS H- linac

    International Nuclear Information System (INIS)

    Alessi, J.G.; Buxton, W.; Kponou, A.; LoDestro, V.; Mapes, M.; McNerney, A.J.; Raparia, D.

    1994-01-01

    The AGS linac presently accelerates 25 mA of H - to 200 MeV at a 5 Hz rep-rate and 500 μs pulse width. The Booster takes 4 pulses every 3.8 seconds, and the remaining pulses are used for isotope production. The authors are in the process of upgrading the linac to increase the average current delivered for isotope production by more than a factor of two, while at the same time expecting to decrease linac downtime. Various aspects of this upgrade are discussed, including the upgrade of the control system, new high power transmission line, transport line vacuum, and rf power supply system upgrades

  11. The CESR computer control system

    International Nuclear Information System (INIS)

    Helmke, R.G.; Rice, D.H.; Strohman, C.

    1986-01-01

    The control system for the Cornell Electron Storage Ring (CESR) has functioned satisfactorily since its implementation in 1979. Key characteristics are fast tuning response, almost exclusive use of FORTRAN as a programming language, and efficient coordinated ramping of CESR guide field elements. This original system has not, however, been able to keep pace with the increasing complexity of operation of CESR associated with performance upgrades. Limitations in address space, expandability, access to data system-wide, and program development impediments have prompted the undertaking of a major upgrade. The system under development accomodates up to 8 VAX computers for all applications programs. The database and communications semaphores reside in a shared multi-ported memory, and each hardware interface bus is controlled by a dedicated 32 bit micro-processor in a VME based system. (orig.)

  12. Upgrades of DARWIN, a dose and spectrum monitoring system applicable to various types of radiation over wide energy ranges

    Science.gov (United States)

    Sato, Tatsuhiko; Satoh, Daiki; Endo, Akira; Shigyo, Nobuhiro; Watanabe, Fusao; Sakurai, Hiroki; Arai, Yoichi

    2011-05-01

    A dose and spectrum monitoring system applicable to neutrons, photons and muons over wide ranges of energy, designated as DARWIN, has been developed for radiological protection in high-energy accelerator facilities. DARWIN consists of a phoswitch-type scintillation detector, a data-acquisition (DAQ) module for digital waveform analysis, and a personal computer equipped with a graphical-user-interface (GUI) program for controlling the system. The system was recently upgraded by introducing an original DAQ module based on a field programmable gate array, FPGA, and also by adding a function for estimating neutron and photon spectra based on an unfolding technique without requiring any specific scientific background of the user. The performance of the upgraded DARWIN was examined in various radiation fields, including an operational field in J-PARC. The experiments revealed that the dose rates and spectra measured by the upgraded DARWIN are quite reasonable, even in radiation fields with peak structures in terms of both spectrum and time variation. These results clearly demonstrate the usefulness of DARWIN for improving radiation safety in high-energy accelerator facilities.

  13. Upgrades of DARWIN, a dose and spectrum monitoring system applicable to various types of radiation over wide energy ranges

    International Nuclear Information System (INIS)

    Sato, Tatsuhiko; Satoh, Daiki; Endo, Akira; Shigyo, Nobuhiro; Watanabe, Fusao; Sakurai, Hiroki; Arai, Yoichi

    2011-01-01

    A dose and spectrum monitoring system applicable to neutrons, photons and muons over wide ranges of energy, designated as DARWIN, has been developed for radiological protection in high-energy accelerator facilities. DARWIN consists of a phoswitch-type scintillation detector, a data-acquisition (DAQ) module for digital waveform analysis, and a personal computer equipped with a graphical-user-interface (GUI) program for controlling the system. The system was recently upgraded by introducing an original DAQ module based on a field programmable gate array, FPGA, and also by adding a function for estimating neutron and photon spectra based on an unfolding technique without requiring any specific scientific background of the user. The performance of the upgraded DARWIN was examined in various radiation fields, including an operational field in J-PARC. The experiments revealed that the dose rates and spectra measured by the upgraded DARWIN are quite reasonable, even in radiation fields with peak structures in terms of both spectrum and time variation. These results clearly demonstrate the usefulness of DARWIN for improving radiation safety in high-energy accelerator facilities.

  14. Test of the photon detection system for the LHCb RICH Upgrade in a charged particle beam

    CERN Document Server

    Baszczyk, M.K.

    2017-01-16

    The LHCb detector will be upgraded to make more efficient use of the available luminosity at the LHC in Run III and extend its potential for discovery. The Ring Imaging Cherenkov detectors are key components of the LHCb detector for particle identification. In this paper we describe the setup and the results of tests in a charged particle beam, carried out to assess prototypes of the upgraded opto-electronic chain from the Multi-Anode PMT photosensor to the readout and data acquisition system.

  15. The CEBAF control system

    International Nuclear Information System (INIS)

    Watson, W.A. III.

    1995-01-01

    CEBAF has recently upgraded its accelerator control system to use EPICS, a control system toolkit being developed by a collaboration among laboratories in the US and Europe. The migration to EPICS has taken place during a year of intense commissioning activity, with new and old control systems operating concurrently. Existing CAMAC hardware was preserved by adding a CAMAC serial highway link to VME; newer hardware developments are now primarily in VME. Software is distributed among three tiers of computers: first, workstations and X terminals for operator interfaces and high level applications; second, VME single board computers for distributed access to hardware and for local control processing; third, embedded processors where needed for faster closed loop operation. This system has demonstrated the ability to scale EPICS to controlling thousands of devices, including hundreds of embedded processors, with control distributed among dozens of VME processors executing more than 125,000 EPICS database records. To deal with the large size of the control system, CEBAF has integrated an object oriented database, providing data management capabilities for both low level I/O and high level machine modeling. A new callable interface which is control system independent permits access to live EPICS data, data in other Unix processes, and data contained in the object oriented database

  16. The upgraded JET toroidal Alfvén eigenmode diagnostic system

    Science.gov (United States)

    Puglia, P.; Pires de Sa, W.; Blanchard, P.; Dorling, S.; Dowson, S.; Fasoli, A.; Figueiredo, J.; Galvão, R.; Graham, M.; Jones, G.; Perez von Thun, C.; Porkolab, M.; Ruchko, L.; Testa, D.; Woskov, P.; Albarracin-Manrique, M. A.; Contributors, JET

    2016-11-01

    The main characteristics of toroidal Alfvén eigenmodes (TAEs) have been successfully investigated in JET (Joint European Torus) using the scheme of sweeping-frequency external excitation with tracking of the synchronously-detected resonances. However, due to technical limitations, only modes with low values of the toroidal mode number n≤slant 7 could be effectively excited and unambiguously identified by the Alfvén Eigenmode Active Diagnostic (AEAD) system. This represents a serious restriction because theoretical models indicate that medium-n Alfvén eigenmodes (AEs) are the most prone to be destabilized by energetic particles in ignited plasmas and, therefore, reliable measurement of their damping rates remains a relevant issue to properly access their effect in ignited plasmas. For this reason, a major upgrade of the AEAD system has been carried out aiming at providing a state-of-the-art excitation and real-time detection system for the planned DT campaign in JET. This required the development of a new type of radio frequency amplifier and filter, not commercially available, and also a control system. In this paper, details of the concepts that are relevant to understand the operation of the new system in the next experimental campaigns are presented, as are the results of numerical simulations to model its performance.

  17. CRISPR-Cas systems: Prokaryotes upgrade to adaptive immunity.

    Science.gov (United States)

    Barrangou, Rodolphe; Marraffini, Luciano A

    2014-04-24

    Clustered regularly interspaced short palindromic repeats (CRISPR), and associated proteins (Cas) comprise the CRISPR-Cas system, which confers adaptive immunity against exogenic elements in many bacteria and most archaea. CRISPR-mediated immunization occurs through the uptake of DNA from invasive genetic elements such as plasmids and viruses, followed by its integration into CRISPR loci. These loci are subsequently transcribed and processed into small interfering RNAs that guide nucleases for specific cleavage of complementary sequences. Conceptually, CRISPR-Cas shares functional features with the mammalian adaptive immune system, while also exhibiting characteristics of Lamarckian evolution. Because immune markers spliced from exogenous agents are integrated iteratively in CRISPR loci, they constitute a genetic record of vaccination events and reflect environmental conditions and changes over time. Cas endonucleases, which can be reprogrammed by small guide RNAs have shown unprecedented potential and flexibility for genome editing and can be repurposed for numerous DNA targeting applications including transcriptional control. Copyright © 2014 Elsevier Inc. All rights reserved.

  18. Electromagnetic and structural global model of the TF magnet system in ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Zammuto, I., E-mail: irene.zammuto@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, EURATOM Association, D-85740 Garching (Germany); Streibl, B.; Giannone, L.; Herrmann, A.; Kallenbach, A.; Mertens, V. [Max-Planck-Institut für Plasmaphysik, EURATOM Association, D-85740 Garching (Germany)

    2013-10-15

    Highlights: ► An electromagnetic and structural FE 3D model is set up for ASDEX Upgrade. ► The model is benchmarked against the old design results, present displacement measurements. ► The benchmarked model is applied to the present plasma configurations, which have a different poloidal field distribution with respect to the design case. ► The different poloidal field influences the out-of-plane force distribution, thus requiring an update of the TF safety system. -- Abstract: The enhancements carried out in the tokamak ASDEX Upgrade (AUG) are oriented toward the preparation of the future physics-related activities of ITER and DEMO. To address the main ITER issues, plasma configurations with a wider operational limit (e.g. higher triangularity) are planned for the future experimental campaigns in AUG. To evaluate the mechanical impact on the toroidal field (TF) magnet system a combined electromagnetic and structural finite element model was set up. At first extensive benchmarks of the models are carried out against the AUG reference design configurations with respect to stress [1–3], lateral displacement measurements and poloidal flux pattern. The numerical model was then applied to a set of actual high triangularity (HT) configurations generated by a more favorable poloidal field (PF) current distribution made possible by an extension of the power supply system. The resulting change of the poloidal flux pattern and the lateral force distribution has consequences for the coil shear stress and vault stability. Both aspects are monitored by a safety system measuring the PF flux placed on top and bottom of the outer surface of two TF coils (TFCs) between vault and the TFC supporting structure, so called Turn Over Structure (TOS). The range of the new HT configurations has induced a modification of the flux pattern, so that an adaptation of safety system is required to protect the TFCs system. Following the same criteria of the old safety system [4,5], a new

  19. Technical Design Report for the Phase-I Upgrade of the ATLAS TDAQ System

    CERN Document Server

    AUTHOR|(CDS)2069742; Abbott, Brad; Abdallah, Jalal; Abdel Khalek, Samah; Abdinov, Ovsat; Aben, Rosemarie; Abi, Babak; AbouZeid, Ossama; Abramowicz, Halina; Abreu, Henso; Abreu, Ricardo; Abulaiti, Yiming; Acharya, Bobby Samir; Achenbach, Ralf; Adamczyk, Leszek; Adams, David; Adelman, Jahred; Adomeit, Stefanie; Adye, Tim; Aefsky, Scott; Agatonovic-Jovin, Tatjana; Aguilar-Saavedra, Juan Antonio; Agustoni, Marco; Ahlen, Steven; Ahmad, Ashfaq; Ahmadov, Faig; Aielli, Giulio; Åkesson, Torsten Paul Ake; Akimoto, Ginga; Akimov, Andrei; Alam, Muhammad Aftab; Albert, Justin; Albrand, Solveig; Alconada Verzini, Maria Josefina; Aleksa, Martin; Aleksandrov, Igor; Alexa, Calin; Alexander, Gideon; Alexandre, Gauthier; Alexandrov, Evgeny; Alexopoulos, Theodoros; Alhroob, Muhammad; Alimonti, Gianluca; Alio, Lion; Alison, John; Allbrooke, Benedict; Allison, Lee John; Allport, Phillip; Allwood-Spiers, Sarah; Almond, John; Aloisio, Alberto; Alon, Raz; Alonso, Alejandro; Alonso, Francisco; Altheimer, Andrew David; Alvarez Gonzalez, Barbara; Alviggi, Mariagrazia; Amaral Coutinho, Yara; Amelung, Christoph; Amor Dos Santos, Susana Patricia; Amoroso, Simone; Amram, Nir; Amundsen, Glenn; Anastopoulos, Christos; Ancu, Lucian Stefan; Andari, Nansi; Andeen, Timothy; Anders, Christoph Falk; Anders, Gabriel; Anderson, John Thomas; Anderson, Kelby; Andreazza, Attilio; Andrei, George Victor; Anduaga, Xabier; Angelidakis, Stylianos; Angelozzi, Ivan; Anger, Philipp; Angerami, Aaron; Anisenkov, Alexey; Anjos, Nuno; Annovi, Alberto; Antonaki, Ariadni; Antonelli, Mario; Antonov, Alexey; Antos, Jaroslav; Anulli, Fabio; Aoki, Masato; Aperio Bella, Ludovica; Apolle, Rudi; Arabidze, Giorgi; Aracena, Ignacio; Arai, Yasuo; Araujo Ferraz, Victor; Arce, Ayana; Arguin, Jean-Francois; Argyropoulos, Spyridon; Arik, Metin; Armbruster, Aaron James; Arnaez, Olivier; Arnal, Vanessa; Arslan, Ozan; Artamonov, Andrei; Artoni, Giacomo; Asai, Shoji; Asbah, Nedaa; Ask, Stefan; Åsman, Barbro; Asquith, Lily; Assamagan, Ketevi; Astalos, Robert; Atkinson, Markus; Atlay, Naim Bora; Auerbach, Benjamin; Augsten, Kamil; Augusto, José; Aurousseau, Mathieu; Avolio, Giuseppe; Azuelos, Georges; Azuma, Yuya; Baak, Max; Baas, Alessandra; Bach, Andre; Bachacou, Henri; Bachas, Konstantinos; Backes, Moritz; Backhaus, Malte; Backus Mayes, John; Badescu, Elisabeta; Bagiacchi, Paolo; Bagnaia, Paolo; Bai, Yu; Bain, Travis; Baines, John; Baker, Oliver Keith; Baker, Sarah; Balek, Petr; Ballestrero, Sergio; Balli, Fabrice; Banas, Elzbieta; Banerjee, Swagato; Bangert, Andrea Michelle; Bansal, Vikas; Bansil, Hardeep Singh; Barak, Liron; Barber, Tom; Barberio, Elisabetta Luigia; Barberis, Dario; Barbero, Marlon; Barillari, Teresa; Barisonzi, Marcello; Barklow, Timothy; Barlow, Nick; Barnett, Bruce; Barnett, Michael; Baroncelli, Antonio; Barone, Gaetano; Barr, Alan; Barreiro, Fernando; Barreiro Guimarães da Costa, João; Bartoldus, Rainer; Barton, Adam Edward; Bartos, Pavol; Bartsch, Valeria; Bassalat, Ahmed; Basye, Austin; Bates, Richard; Batkova, Lucia; Batley, Richard; Batraneanu, Silvia; Battistin, Michele; Bauer, Florian; Bauss, Bruno; Bawa, Harinder Singh; Beacham, James Baker; Beau, Tristan; Beauchemin, Pierre-Hugues; Bechtle, Philip; Beck, Hans Peter; Becker, Anne Kathrin; Becker, Sebastian; Beckingham, Matthew; Beddall, Andrew; Beddall, Ayda; Bedikian, Sourpouhi; Bednyakov, Vadim; Bee, Christopher; Beemster, Lars; Beermann, Thomas; Begel, Michael; Behr, Katharina; Belanger-Champagne, Camille; Bell, Paul; Bell, William; Bella, Gideon; Bellagamba, Lorenzo; Bellerive, Alain; Bellomo, Massimiliano; Belloni, Alberto; Belotskiy, Konstantin; Beltramello, Olga; Benary, Odette; Benchekroun, Driss; Bendtz, Katarina; Benekos, Nektarios; Benhammou, Yan; Benhar Noccioli, Eleonora; Benitez Garcia, Jorge-Armando; Benjamin, Douglas; Bensinger, James; Bentvelsen, Stan; Beretta, Matteo; Berge, David; Bergeaas Kuutmann, Elin; Berger, Nicolas; Berghaus, Frank; Berglund, Elina; Beringer, Jürg; Bernard, Clare; Bernat, Pauline; Bernius, Catrin; Bernlochner, Florian Urs; Berry, Tracey; Berta, Peter; Bertella, Claudia; Bertelsen, Henrik; Bertolucci, Federico; Besana, Maria Ilaria; Besjes, Geert-Jan; Bessidskaia Bylund, Olga; Besson, Nathalie; Betancourt, Christopher; Bethke, Siegfried; Bhimji, Wahid; Bianchi, Riccardo-Maria; Bianchini, Louis; Bianco, Michele; Biebel, Otmar; Bieniek, Stephen Paul; Bierwagen, Katharina; Biesiada, Jed; Biglietti, Michela; Bilbao De Mendizabal, Javier; Bilokon, Halina; Bindi, Marcello; Binet, Sebastien; Bingul, Ahmet; Bini, Cesare; Bittner, Bernhard; Black, Curtis; Black, James; Black, Kevin; Blackburn, Daniel; Blair, Robert; Blanchard, Jean-Baptiste; Blazek, Tomas; Bloch, Ingo; Blocker, Craig; Blum, Walter; Blumenschein, Ulrike; Bobbink, Gerjan; Bobrovnikov, Victor; Bocchetta, Simona Serena; Bocci, Andrea; Boddy, Christopher Richard; Boehler, Michael; Boek, Jennifer; Boek, Thorsten Tobias; Bogdan, Mircea Arghir; Bogdanchikov, Alexander; Bohm, Christian; Boisvert, Veronique; Bold, Tomasz; Boldyrev, Alexey; Bolnet, Nayanka Myriam; Bomben, Marco; Bona, Marcella; Boonekamp, Maarten; Borga, Andrea; Borisov, Anatoly; Borissov, Guennadi; Borri, Marcello; Borroni, Sara; Bortfeldt, Jonathan; Bortolotto, Valerio; Bos, Kors; Boscherini, Davide; Bosman, Martine; Boterenbrood, Hendrik; Bouchami, Jihene; Boudreau, Joseph; Bouhova-Thacker, Evelina Vassileva; Boumediene, Djamel Eddine; Bourdarios, Claire; Bousson, Nicolas; Boutouil, Sara; Boveia, Antonio; Boyd, James; Boyko, Igor; Bozovic-Jelisavcic, Ivanka; Bracinik, Juraj; Brandt, Andrew; Brandt, Gerhard; Brandt, Oleg; Bratzler, Uwe; Brau, Benjamin; Brau, James; Brawn, Ian; Brazzale, Simone Federico; Brelier, Bertrand; Brendlinger, Kurt; Brennan, Amelia Jean; Brenner, Richard; Bressler, Shikma; Bristow, Kieran; Bristow, Timothy Michael; Britton, Dave; Brochu, Frederic; Brock, Ian; Brock, Raymond; Bronner, Johanna; Brooijmans, Gustaaf; Brooks, Timothy; Brooks, William; Brosamer, Jacquelyn; Brost, Elizabeth; Brown, Gareth; Brown, Jonathan; Bruckman de Renstrom, Pawel; Bruncko, Dusan; Bruneliere, Renaud; Brunet, Sylvie; Bruni, Alessia; Bruni, Graziano; Bruschi, Marco; Bryngemark, Lene; Buanes, Trygve; Buat, Quentin; Bucci, Francesca; Buchholz, Peter; Buckingham, Ryan; Buckley, Andrew; Buda, Stelian Ioan; Budagov, Ioulian; Budick, Burton; Buehrer, Felix; Bugge, Lars; Bugge, Magnar Kopangen; Bulekov, Oleg; Bundock, Aaron Colin; Bunse, Moritz; Burdin, Sergey; Burghgrave, Blake; Burke, Stephen; Burmeister, Ingo; Busato, Emmanuel; Büscher, Volker; Bussey, Peter; Buszello, Claus-Peter; Butler, Bart; Butler, John; Butt, Aatif Imtiaz; Buttar, Craig; Butterworth, Jonathan; Buttinger, William; Buzatu, Adrian; Byszewski, Marcin; Cabrera Urbán, Susana; Caforio, Davide; Cakir, Orhan; Calafiura, Paolo; Calderini, Giovanni; Calfayan, Philippe; Calkins, Robert; Caloba, Luiz; Calvet, David; Calvet, Samuel; Camacho Toro, Reina; Cameron, David; Caminada, Lea Michaela; Caminal Armadans, Roger; Campana, Simone; Campanelli, Mario; Campoverde, Angel; Canale, Vincenzo; Canelli, Florencia; Canepa, Anadi; Cantero, Josu; Cantrill, Robert; Cao, Tingting; Capeans Garrido, Maria Del Mar; Caprini, Irinel; Caprini, Mihai; Capua, Marcella; Caputo, Regina; Cardarelli, Roberto; Carli, Tancredi; Carlino, Gianpaolo; Carminati, Leonardo; Caron, Sascha; Carquin, Edson; Carrillo-Montoya, German D; Carter, Janet; Casadei, Diego; Casado, Maria Pilar; Castaneda-Miranda, Elizabeth; Castelli, Angelantonio; Castillo Gimenez, Victoria; Castro, Nuno Filipe; Catastini, Pierluigi; Catinaccio, Andrea; Catmore, James; Cattai, Ariella; Cattani, Giordano; Caughron, Seth; Cavaliere, Viviana; Cavalli, Donatella; Cavalli-Sforza, Matteo; Cavasinni, Vincenzo; Ceradini, Filippo; Cerio, Benjamin; Cerny, Karel; Cerqueira, Augusto Santiago; Cerri, Alessandro; Cerrito, Lucio; Cerutti, Fabio; Cerv, Matevz; Cervelli, Alberto; Cetin, Serkant Ali; Chafaq, Aziz; Chakraborty, Dhiman; Chalupkova, Ina; Chan, Kevin; Chang, Philip; Chapleau, Bertrand; Chapman, John Derek; Charfeddine, Driss; Charlton, Dave; Chavda, Vikash; Chavez Barajas, Carlos Alberto; Cheatham, Susan; Chekanov, Sergei; Chekulaev, Sergey; Chelkov, Gueorgui; Chelstowska, Magda Anna; Chen, Chunhui; Chen, Hucheng; Chen, Karen; Chen, Liming; Chen, Shenjian; Chen, Xin; Chen, Yujiao; Cheng, Hok Chuen; Cheng, Yangyang; Cheplakov, Alexander; Cherkaoui El Moursli, Rajaa; Chernyatin, Valeriy; Cheu, Elliott; Chevalier, Laurent; Chiarella, Vitaliano; Chiefari, Giovanni; Childers, John Taylor; Chilingarov, Alexandre; Chiodini, Gabriele; Chisholm, Andrew; Chislett, Rebecca Thalatta; Chitan, Adrian; Chizhov, Mihail; Chouridou, Sofia; Chow, Bonnie Kar Bo; Christidi, Ilektra-Athanasia; Chudoba, Jiri; Ciapetti, Guido; Ciftci, Abbas Kenan; Ciftci, Rena; Cinca, Diane; Cindro, Vladimir; Ciocio, Alessandra; Ciodaro Xavier, Thiago; Cirkovic, Predrag; Citraro, Saverio; Citron, Zvi Hirsh; Citterio, Mauro; Ciubancan, Mihai; Clark, Allan G; Clark, Philip James; Clarke, Robert; Clemens, Jean-Claude; Clement, Benoit; Clement, Christophe; Coadou, Yann; Cobal, Marina; Coccaro, Andrea; Cochran, James H; Coffey, Laurel; Cogan, Joshua Godfrey; Coggeshall, James; Cole, Brian; Cole, Stephen; Colijn, Auke-Pieter; Collins-Tooth, Christopher; Collot, Johann; Colombo, Tommaso; Colon, German; Compostella, Gabriele; Conde Muiño, Patricia; Coniavitis, Elias; Conidi, Maria Chiara; Connelly, Ian; Consonni, Sofia Maria; Consorti, Valerio; Constantinescu, Serban; Conti, Geraldine; Conventi, Francesco; Cooke, Mark; Cooper, Ben; Cooper-Sarkar, Amanda; Cooper-Smith, Neil; Copic, Katherine; Cornelissen, Thijs; Corradi, Massimo; Corriveau, Francois; Corso-Radu, Alina; Cortes-Gonzalez, Arely; Cortiana, Giorgio; Costa, Giuseppe; Costa, María José; Costanzo, Davide; Côté, David; Cottin, Giovanna; Coura Torres, Rodrigo; Cowan, Glen; Cox, Brian; Cranmer, Kyle; Cree, Graham; Crépé-Renaudin, Sabine; Crescioli, Francesco; Crispin Ortuzar, Mireia; Cristinziani, Markus; Crone, Gordon Jeremy; Crosetti, Giovanni; Cuciuc, Constantin-Mihai; Cuenca Almenar, Cristóbal; Cuhadar Donszelmann, Tulay; Cummings, Jane; Curatolo, Maria; Cuthbert, Cameron; Czirr, Hendrik; Czodrowski, Patrick; Czyczula, Zofia; D'Auria, Saverio; D'Onofrio, Monica; D'Orazio, Alessia; Da Cunha Sargedas De Sousa, Mario Jose; Da Via, Cinzia; Dabrowski, Wladyslaw; Dafinca, Alexandru; Dai, Tiesheng; Dale, Orjan; Dallaire, Frederick; Dallapiccola, Carlo; Dam, Mogens; Daniells, Andrew Christopher; Dano Hoffmann, Maria; Dao, Valerio; Darbo, Giovanni; Darlea, Georgiana Lavinia; Darmora, Smita; Dassoulas, James; Davey, Will; David, Claire; Davidek, Tomas; Davies, Eleanor; Davies, Merlin; Davignon, Olivier; Davison, Adam; Davygora, Yuriy; Dawe, Edmund; Dawson, Ian; Daya-Ishmukhametova, Rozmin; De, Kaushik; de Asmundis, Riccardo; De Castro, Stefano; De Cecco, Sandro; de Graat, Julien; De Groot, Nicolo; de Jong, Paul; De la Torre, Hector; De Lorenzi, Francesco; De Nooij, Lucie; De Pedis, Daniele; De Salvo, Alessandro; De Sanctis, Umberto; De Santo, Antonella; De Vivie De Regie, Jean-Baptiste; Dearnaley, William James; Debbe, Ramiro; Debenedetti, Chiara; Dechenaux, Benjamin; Dedovich, Dmitri; Degenhardt, James; Deigaard, Ingrid; Del Peso, Jose; Del Prete, Tarcisio; Delemontex, Thomas; Deliot, Frederic; Deliyergiyev, Maksym; Dell'Acqua, Andrea; Dell'Asta, Lidia; Dell'Orso, Mauro; Della Pietra, Massimo; della Volpe, Domenico; Delmastro, Marco; Delsart, Pierre-Antoine; Deluca, Carolina; Demers, Sarah; Demichev, Mikhail; Demilly, Aurelien; Denisov, Sergey; Derendarz, Dominik; Derkaoui, Jamal Eddine; Derue, Frederic; Dervan, Paul; Desch, Klaus Kurt; Deviveiros, Pier-Olivier; Dewhurst, Alastair; Dhaliwal, Saminder; Di Ciaccio, Anna; Di Ciaccio, Lucia; Di Domenico, Antonio; Di Donato, Camilla; Di Girolamo, Alessandro; Di Girolamo, Beniamino; Di Mattia, Alessandro; Di Micco, Biagio; Di Nardo, Roberto; Di Simone, Andrea; Di Sipio, Riccardo; Di Valentino, David; Diaz, Marco Aurelio; Diehl, Edward; Dietrich, Janet; Dietzsch, Thorsten; Diglio, Sara; Dimitrievska, Aleksandra; Dingfelder, Jochen; Dionisi, Carlo; Dita, Petre; Dita, Sanda; Dittus, Fridolin; Djama, Fares; Djobava, Tamar; do Vale, Maria Aline Barros; Doan, Thi Kieu Oanh; Dobos, Daniel; Dobson, Ellie; Doglioni, Caterina; Doherty, Tom; Dohmae, Takeshi; Dolejsi, Jiri; Dolezal, Zdenek; Donadelli, Marisilvia; Donati, Simone; Dondero, Paolo; Donini, Julien; Dopke, Jens; Doria, Alessandra; Dova, Maria-Teresa; Doyle, Tony; Drake, Gary; Dris, Manolis; Dubbert, Jörg; Dube, Sourabh; Dubreuil, Emmanuelle; Duchovni, Ehud; Duckeck, Guenter; Ducu, Otilia Anamaria; Duda, Dominik; Dudarev, Alexey; Dudziak, Fanny; Duflot, Laurent; Duguid, Liam; Dührssen, Michael; Dunford, Monica; Duran Yildiz, Hatice; Düren, Michael; Dwuznik, Michal; Ebke, Johannes; Edmunds, Daniel; Edson, William; Edwards, Clive; Edwards, Nicholas Charles; Ehrenfeld, Wolfgang; Eifert, Till; Eigen, Gerald; Einsweiler, Kevin; Ekelof, Tord; El Kacimi, Mohamed; Ellert, Mattias; Elles, Sabine; Ellinghaus, Frank; Ellis, Nicolas; Elmsheuser, Johannes; Elsing, Markus; Emeliyanov, Dmitry; Enari, Yuji; Endner, Oliver Chris; Endo, Masaki; Erdmann, Johannes; Ereditato, Antonio; Ermoline, Iouri; Ernis, Gunar; Ernst, Jesse; Ernst, Michael; Ernwein, Jean; Errede, Deborah; Errede, Steven; Ertel, Eugen; Escalier, Marc; Esch, Hendrik; Escobar, Carlos; Esposito, Bellisario; Etienvre, Anne-Isabelle; Etzion, Erez; Evangelakou, Despoina; Evans, Hal; Fabbri, Laura; Facini, Gabriel; Fakhrutdinov, Rinat; Falciano, Speranza; Faltova, Jana; Fang, Yaquan; Fanti, Marcello; Farbin, Amir; Farilla, Addolorata; Farooque, Trisha; Farrell, Steven; Farrington, Sinead; Farthouat, Philippe; Fassi, Farida; Fassnacht, Patrick; Fassouliotis, Dimitrios; Fatholahzadeh, Baharak; Faulkner, Peter; Favareto, Andrea; Fayard, Louis; Federic, Pavol; Fedin, Oleg; Fedorko, Wojciech; Fehling-Kaschek, Mirjam; Feigl, Simon; Feligioni, Lorenzo; Feng, Cunfeng; Feng, Eric; Feng, Haolu; Fenyuk, Alexander; Fernandez Perez, Sonia; Ferrag, Samir; Ferrando, James; Ferrara, Valentina; Ferrari, Arnaud; Ferrari, Pamela; Ferrari, Roberto; Ferreira de Lima, Danilo Enoque; Ferrer, Antonio; Ferrere, Didier; Ferretti, Claudio; Ferretto Parodi, Andrea; Fiascaris, Maria; Fiedler, Frank; Filipčič, Andrej; Filipuzzi, Marco; Filthaut, Frank; Fincke-Keeler, Margret; Finelli, Kevin Daniel; Fiolhais, Miguel; Fiorini, Luca; Firan, Ana; Fischer, Julia; Fisher, Matthew; Fitzgerald, Eric Andrew; Flechl, Martin; Fleck, Ivor; Fleischmann, Philipp; Fleischmann, Sebastian; Fletcher, Gareth Thomas; Fletcher, Gregory; Flick, Tobias; Floderus, Anders; Flores Castillo, Luis; Florez Bustos, Andres Carlos; Flowerdew, Michael; Formica, Andrea; Forti, Alessandra; Fortin, Dominique; Fournier, Daniel; Fox, Harald; Francavilla, Paolo; Franchini, Matteo; Franchino, Silvia; Francis, David; Franklin, Melissa; Franz, Sebastien; Fraternali, Marco; Fratina, Sasa; French, Sky; Friedrich, Conrad; Friedrich, Felix; Froidevaux, Daniel; Front, David Moris; Frost, James; Fukunaga, Chikara; Fullana Torregrosa, Esteban; Fulsom, Bryan Gregory; Fusayasu, Takahiro; Fuster, Juan; Gabaldon, Carolina; Gabizon, Ofir; Gabrielli, Alessandro; Gabrielli, Andrea; Gadatsch, Stefan; Gadfort, Thomas; Gadomski, Szymon; Gagliardi, Guido; Gagnon, Pauline; Galea, Cristina; Galhardo, Bruno; Gallas, Elizabeth; Gallo, Valentina Santina; Gallop, Bruce; Gallus, Petr; Galster, Gorm Aske Gram Krohn; Gan, KK; Gandrajula, Reddy Pratap; Gao, Jun; Gao, Yongsheng; Garay Walls, Francisca; Garberson, Ford; García, Carmen; García Navarro, José Enrique; Garcia-Sciveres, Maurice; Gardner, Robert; Garelli, Nicoletta; Garonne, Vincent; Gatti, Claudio; Gaudio, Gabriella; Gaur, Bakul; Gauthier, Lea; Gavrilenko, Igor; Gay, Colin; Gaycken, Goetz; Gazis, Evangelos; Ge, Peng; Gecse, Zoltan; Gee, Norman; Geerts, Daniël Alphonsus Adrianus; Geich-Gimbel, Christoph; Gellerstedt, Karl; Gemme, Claudia; Gemmell, Alistair; Genest, Marie-Hélène; Gentile, Simonetta; Gentsos, Christos; George, Matthias; George, Simon; Gerbaudo, Davide; Gershon, Avi; Ghibaudi, Marco; Ghodbane, Nabil; Giacobbe, Benedetto; Giagu, Stefano; Giangiobbe, Vincent; Giannetti, Paola; Gianotti, Fabiola; Gibson, Stephen; Gillam, Thomas; Gillberg, Dag; Gingrich, Douglas; Giokaris, Nikos; Giordani, MarioPaolo; Giordano, Raffaele; Giorgi, Francesco Michelangelo; Giovannini, Paola; Giraud, Pierre-Francois; Giugni, Danilo; Giuliani, Claudia; Giulini, Maddalena; Giunta, Michele; Gjelsten, Børge Kile; Gkaitatzis, Stamatios; Gkialas, Ioannis; Gladilin, Leonid; Glasman, Claudia; Glatzer, Julian; Glazov, Alexandre; Glonti, George; Goblirsch-Kolb, Maximilian; Goddard, Jack Robert; Godfrey, Jennifer; Godlewski, Jan; Goeringer, Christian; Goldfarb, Steven; Golling, Tobias; Golubkov, Dmitry; Gomes, Agostinho; Gomez Fajardo, Luz Stella; Gonçalo, Ricardo; Goncalves Gama, Rafael; Goncalves Pinto Firmino Da Costa, Joao; Gonella, Laura; González de la Hoz, Santiago; Gonzalez Parra, Garoe; Gonzalez Silva, Laura; Gonzalez-Sevilla, Sergio; Goossens, Luc; Gorbounov, Petr Andreevich; Gordon, Howard; Gorelov, Igor; Gorini, Benedetto; Gorini, Edoardo; Gorišek, Andrej; Gornicki, Edward; Goshaw, Alfred; Gössling, Claus; Gostkin, Mikhail Ivanovitch; Gouighri, Mohamed; Goujdami, Driss; Goulette, Marc Phillippe; Goussiou, Anna; Goy, Corinne; Gozpinar, Serdar; Grabas, Herve Marie Xavier; Graber, Lars; Grabowska-Bold, Iwona; Grafström, Per; Grahn, Karl-Johan; Gramling, Johanna; Gramstad, Eirik; Grancagnolo, Sergio; Grassi, Valerio; Gratchev, Vadim; Gray, Heather; Gray, Julia Ann; Graziani, Enrico; Grebenyuk, Oleg; Green, Barry; Greenwood, Zeno Dixon; Gregersen, Kristian; Gregor, Ingrid-Maria; Grenier, Philippe; Griffiths, Justin; Grillo, Alexander; Grimm, Kathryn; Grinstein, Sebastian; Gris, Philippe Luc Yves; Grishkevich, Yaroslav; Grivaz, Jean-Francois; Grohs, Johannes Philipp; Grohsjean, Alexander; Gross, Eilam; Grosse-Knetter, Joern; Grossi, Giulio Cornelio; Groth-Jensen, Jacob; Grout, Zara Jane; Grybel, Kai; Guan, Liang; Guescini, Francesco; Guest, Daniel; Gueta, Orel; Guicheney, Christophe; Guido, Elisa; Guillemin, Thibault; Guindon, Stefan; Gul, Umar; Gumpert, Christian; Gunther, Jaroslav; Guo, Jun; Gupta, Shaun; Gutierrez, Phillip; Gutierrez Ortiz, Nicolas Gilberto; Gutschow, Christian; Guttman, Nir; Guyot, Claude; Gwenlan, Claire; Gwilliam, Carl; Haas, Andy; Haas, Stefan; Haber, Carl; Hadavand, Haleh Khani; Haefner, Petra; Hageböck, Stephan; Hakobyan, Hrachya; Haleem, Mahsana; Hall, David; Halladjian, Garabed; Hamacher, Klaus; Hamal, Petr; Hamano, Kenji; Hamer, Matthias; Hamilton, Andrew; Hamilton, Samuel; Han, Liang; Hanagaki, Kazunori; Hanawa, Keita; Hance, Michael; Hanke, Paul; Hansen, Jørgen Beck; Hansen, Jorn Dines; Hansen, Peter Henrik; Hansson, Per; Hara, Kazuhiko; Hard, Andrew; Harenberg, Torsten; Harkusha, Siarhei; Harper, Devin; Harrington, Robert; Harris, Orin; Harrison, Paul Fraser; Hartjes, Fred; Hasegawa, Satoshi; Hasegawa, Yoji; Hassani, Samira; Haug, Sigve; Hauschild, Michael; Hauser, Reiner; Havranek, Miroslav; Hawkes, Christopher; Hawkings, Richard John; Hawkins, Anthony David; Hayashi, Takayasu; Hayden, Daniel; Hays, Chris; Hayward, Helen; Haywood, Stephen; Head, Simon; Heck, Tobias; Hedberg, Vincent; Heelan, Louise; Heim, Sarah; Heim, Timon; Heinemann, Beate; Heinrich, Lukas; Heisterkamp, Simon; Hejbal, Jiri; Helary, Louis; Heller, Claudio; Heller, Matthieu; Hellman, Sten; Hellmich, Dennis; Helsens, Clement; Henderson, James; Henderson, Robert; Hengler, Christopher; Henrichs, Anna; Henriques Correia, Ana Maria; Henrot-Versille, Sophie; Hensel, Carsten; Herbert, Geoffrey Henry; Hernández Jiménez, Yesenia; Herrberg-Schubert, Ruth; Herten, Gregor; Hertenberger, Ralf; Hervas, Luis; Hesketh, Gavin Grant; Hessey, Nigel; Hickling, Robert; Higón-Rodriguez, Emilio; Higuchi, Kota; Hill, John; Hiller, Karl Heinz; Hillert, Sonja; Hillier, Stephen; Hinchliffe, Ian; Hines, Elizabeth; Hirose, Minoru; Hirschbuehl, Dominic; Hobbs, John; Hod, Noam; Hodgkinson, Mark; Hodgson, Paul; Hoecker, Andreas; Hoeferkamp, Martin; Hoffman, Julia; Hoffmann, Dirk; Hofmann, Julia Isabell; Hohlfeld, Marc; Holmes, Tova Ray; Hong, Tae Min; Hooft van Huysduynen, Loek; Hostachy, Jean-Yves; Hou, Suen; Hoummada, Abdeslam; Howard, Jacob; Howarth, James; Hrabovsky, Miroslav; Hristova, Ivana; Hrivnac, Julius; Hryn'ova, Tetiana; Hsu, Pai-hsien Jennifer; Hsu, Shih-Chieh; Hu, Diedi; Hu, Xueye; Huang, Yanping; Hubacek, Zdenek; Hubaut, Fabrice; Huegging, Fabian; Huettmann, Antje; Huffman, Todd Brian; Hughes, Emlyn; Hughes, Gareth; Huhtinen, Mika; Hülsing, Tobias Alexander; Hurwitz, Martina; Huseynov, Nazim; Huston, Joey; Huth, John; Iacobucci, Giuseppe; Iakovidis, Georgios; Ibragimov, Iskander; Iconomidou-Fayard, Lydia; Ideal, Emma; Iengo, Paolo; Igonkina, Olga; Iizawa, Tomoya; Ikegami, Yoichi; Ikematsu, Katsumasa; Ikeno, Masahiro; Ilchenko, Iurii; Iliadis, Dimitrios; Ilic, Nikolina; Inamaru, Yuki; Ince, Tayfun; Ioannou, Pavlos; Iodice, Mauro; Iordanidou, Kalliopi; Ippolito, Valerio; Irles Quiles, Adrian; Isaksson, Charlie; Ishino, Masaya; Ishitsuka, Masaki; Ishmukhametov, Renat; Issever, Cigdem; Istin, Serhat; Iturbe Ponce, Julia Mariana; Ivashin, Anton; Iwanski, Wieslaw; Iwasaki, Hiroyuki; Izen, Joseph; Izzo, Vincenzo; Jackson, Brett; Jackson, John; Jackson, Matthew; Jackson, Paul; Jaekel, Martin; Jain, Vivek; Jakobi, Katharina Bianca; Jakobs, Karl; Jakobsen, Sune; Jakoubek, Tomas; Jakubek, Jan; Jamin, David Olivier; Jana, Dilip; Jansen, Eric; Jansen, Hendrik; Janssen, Jens; Jansweijer, Peter Paul Maarten; Janus, Michel; Jarlskog, Göran; Jeanty, Laura; Jeng, Geng-yuan; Jennens, David; Jenni, Peter; Jentzsch, Jennifer; Jeske, Carl; Jézéquel, Stéphane; Jha, Manoj Kumar; Ji, Haoshuang; Ji, Weina; Jia, Jiangyong; Jiang, Yi; Jimenez Belenguer, Marcos; Jin, Shan; Jinaru, Adam; Jinnouchi, Osamu; Joergensen, Morten Dam; Johansson, Erik; Johansson, Per; Johns, Kenneth; Jon-And, Kerstin; Jones, Graham; Jones, Roger; Jones, Tim; Joos, Markus; Jorge, Pedro; Joshi, Kiran Daniel; Jovicevic, Jelena; Ju, Xiangyang; Jung, Christian; Jungst, Ralph Markus; Jussel, Patrick; Juste Rozas, Aurelio; Kaci, Mohammed; Kaczmarska, Anna; Kado, Marumi; Kagan, Harris; Kagan, Michael; Kahra, Christian; Kajomovitz, Enrique; Kaluza, Adam; Kama, Sami; Kanaya, Naoko; Kaneda, Michiru; Kaneti, Steven; Kanno, Takayuki; Kantserov, Vadim; Kanzaki, Junichi; Kaplan, Benjamin; Kapliy, Anton; Kar, Deepak; Karakostas, Konstantinos; Karastathis, Nikolaos; Karnevskiy, Mikhail; Karpov, Sergey; Karthik, Krishnaiyengar; Kartvelishvili, Vakhtang; Karyukhin, Andrey; Kashif, Lashkar; Kasieczka, Gregor; Kass, Richard; Kastanas, Alex; Kataoka, Yousuke; Katre, Akshay; Katzy, Judith; Kaushik, Venkatesh; Kawagoe, Kiyotomo; Kawamoto, Tatsuo; Kawamura, Gen; Kazama, Shingo; Kazanin, Vassili; Kazarinov, Makhail; Kazarov, Andrei; Keeler, Richard; Kehoe, Robert; Keil, Markus; Keller, John; Kempster, Jacob Julian; Keoshkerian, Houry; Kepka, Oldrich; Kerševan, Borut Paul; Kersten, Susanne; Kessoku, Kohei; Keung, Justin; Keyes, Robert; Khalil-zada, Farkhad; Khandanyan, Hovhannes; Khanov, Alexander; Kharchenko, Dmitri; Khodinov, Alexander; Khoo, Teng Jian; Khoriauli, Gia; Khoroshilov, Andrey; Khovanskiy, Valery; Khramov, Evgeniy; Khubua, Jemal; Kiese, Patric Karl; Kim, Hyeon Jin; Kim, Shinhong; Kimura, Naoki; Kind, Oliver; King, Barry; King, Matthew; King, Robert Steven Beaufoy; King, Samuel Burton; Kirk, Julie; Kiryunin, Andrey; Kishimoto, Tomoe; Kisielewska, Danuta; Kitamura, Takumi; Kiuchi, Kenji; Kladiva, Eduard; Klein, Max; Klein, Uta; Kleinknecht, Konrad; Klimek, Pawel; Klimentov, Alexei; Klimkovich, Tatsiana; Klingenberg, Reiner; Klinger, Joel Alexander; Klioutchnikova, Tatiana; Klok, Peter; Kluge, Eike-Erik; Kluit, Peter; Kluth, Stefan; Kneringer, Emmerich; Knoops, Edith; Knue, Andrea; Kobayashi, Dai; Kobayashi, Tomio; Kobel, Michael; Kocian, Martin; Kodys, Peter; Koevesarki, Peter; Koffas, Thomas; Koffeman, Els; Kogan, Lucy Anne; Kohlmann, Simon; Kohout, Zdenek; Kohriki, Takashi; Koi, Tatsumi; Kolanoski, Hermann; Koletsou, Iro; Koll, James; Kolos, Serguei; Komar, Aston; Komori, Yuto; Kondo, Takahiko; Köneke, Karsten; König, Adriaan; K{ö}nig, Sebastian; Kono, Takanori; Konoplich, Rostislav; Konstantinidis, Nikolaos; Kopeliansky, Revital; Koperny, Stefan; Köpke, Lutz; Kopp, Anna Katharina; Korcyl, Krzysztof; Kordas, Kostantinos; Korn, Andreas; Korol, Aleksandr; Korolkov, Ilya; Korolkova, Elena; Korotkov, Vladislav; Kortner, Oliver; Kortner, Sandra; Kostyukhin, Vadim; Kotov, Vladislav; Kotwal, Ashutosh; Kourkoumelis, Christine; Kouskoura, Vasiliki; Koutsman, Alex; Kowalewski, Robert Victor; Kowalski, Tadeusz; Kozanecki, Witold; Kozhin, Anatoly; Kral, Vlastimil; Kramarenko, Viktor; Kramberger, Gregor; Krasnopevtsev, Dimitriy; Krasny, Mieczyslaw Witold; Krasznahorkay, Attila; Kraus, Jana; Kravchenko, Anton; Kreiss, Sven; Kretzschmar, Jan; Kreutzfeldt, Kristof; Krieger, Nina; Krieger, Peter; Kroeninger, Kevin; Kroha, Hubert; Kroll, Joe; Kroseberg, Juergen; Krstic, Jelena; Kruchonak, Uladzimir; Krüger, Hans; Kruker, Tobias; Krumnack, Nils; Krumshteyn, Zinovii; Kruse, Amanda; Kruse, Mark; Kruskal, Michael; Kubota, Takashi; Kuday, Sinan; Kuehn, Susanne; Kugel, Andreas; Kuhl, Andrew; Kuhl, Thorsten; Kukhtin, Victor; Kulchitsky, Yuri; Kuleshov, Sergey; Kuna, Marine; Kunigo, Takuto; Kunkle, Joshua; Kupco, Alexander; Kurashige, Hisaya; Kurochkin, Yurii; Kurumida, Rie; Kus, Vlastimil; Kuwertz, Emma Sian; Kuze, Masahiro; Kvita, Jiri; La Rosa, Alessandro; La Rotonda, Laura; Lablak, Said; Lacasta, Carlos; Lacava, Francesco; Lacey, James; Lacker, Heiko; Lacour, Didier; Lacuesta, Vicente Ramón; Ladygin, Evgueni; Lafaye, Remi; Laforge, Bertrand; Lagouri, Theodota; Lai, Stanley; Laier, Heiko; Laisne, Emmanuel; Lambourne, Luke; Lampen, Caleb; Lampl, Walter; Lançon, Eric; Landgraf, Ulrich; Landon, Murrough; Lang, Valerie Susanne; Lange, Clemens; Lankford, Andrew; Lanni, Francesco; Lantzsch, Kerstin; Lanza, Agostino; Laplace, Sandrine; Lapoire, Cecile; Laporte, Jean-Francois; Lari, Tommaso; Larner, Aimee; Lassnig, Mario; Laurelli, Paolo; Laurens, Philippe; Lavorini, Vincenzo; Lavrijsen, Wim; Laycock, Paul; Le, Bao Tran; Le Dortz, Olivier; Le Guirriec, Emmanuel; Le Menedeu, Eve; LeCompte, Thomas; Ledroit-Guillon, Fabienne Agnes Marie; Lee, Claire, Alexandra; Lee, Hurng-Chun; Lee, Jason; Lee, Shih-Chang; Lee, Lawrence; Lefebvre, Guillaume; Lefebvre, Michel; Legger, Federica; Leggett, Charles; Lehan, Allan; Lehmacher, Marc; Lehmann Miotto, Giovanna; Lei, Xiaowen; Leister, Andrew Gerard; Leite, Marco Aurelio Lisboa; Leitner, Rupert; Lellouch, Daniel; Lemmer, Boris; Leney, Katharine; Lenz, Tatjana; Lenzi, Bruno; Leone, Robert; Leonhardt, Kathrin; Leonidopoulos, Christos; Leontsinis, Stefanos; Leroy, Claude; Lester, Christopher; Lester, Christopher Michael; Levêque, Jessica; Levin, Daniel; Levinson, Lorne; Lewis, Adrian; Lewis, George; Leyko, Agnieszka; Leyton, Michael; Li, Bing; Li, Bo; Li, Haifeng; Li, Ho Ling; Li, Shu; Li, Xuefei; Liang, Zhijun; Liao, Hongbo; Liberali, Valentino; Liberti, Barbara; Lie, Ki; Liebal, Jessica; Liebig, Wolfgang; Limbach, Christian; Limosani, Antonio; Lin, Simon; Linde, Frank; Lindquist, Brian Edward; Linnemann, James; Lipeles, Elliot; Lipniacka, Anna; Lisovyi, Mykhailo; Liss, Tony; Lister, Alison; Litke, Alan; Liu, Bo; Liu, Dong; Liu, Jianbei; Liu, Kun; Liu, Lulu; Liu, Miaoyuan; Liu, Minghui; Liu, Yanwen; Livan, Michele; Livermore, Sarah; Lleres, Annick; Llorente Merino, Javier; Lloyd, Stephen; Lo Sterzo, Francesco; Lobodzinska, Ewelina; Loch, Peter; Lockman, William; Loddenkoetter, Thomas; Loebinger, Fred; Loevschall-Jensen, Ask Emil; Loginov, Andrey; Loh, Chang Wei; Lohse, Thomas; Lohwasser, Kristin; Lokajicek, Milos; Lombardo, Vincenzo Paolo; Long, Brian Alexander; Long, Jonathan; Long, Robin Eamonn; Lopes, Lourenco; Lopez Mateos, David; Lopez Paredes, Brais; Lorenz, Jeanette; Lorenzo Martinez, Narei; Losada, Marta; Loscutoff, Peter; Lou, XinChou; Lounis, Abdenour; Love, Jeremy; Love, Peter; Lowe, Andrew; Lu, Feng; Lubatti, Henry; Luci, Claudio; Luciano, Pierluigi; Lucotte, Arnaud; Ludwig, Dörthe; Luehring, Frederick; Lukas, Wolfgang; Luminari, Lamberto; Lundberg, Johan; Lundberg, Olof; Lund-Jensen, Bengt; Lungwitz, Matthias; Luongo, Carmela; Lupu, Nachman; Lynn, David; Lysak, Roman; Lytken, Else; Ma, Hong; Ma, Lian Liang; Maccarrone, Giovanni; Macchiolo, Anna; Maček, Boštjan; Macey, Tom; Machado Miguens, Joana; Macina, Daniela; Madar, Romain; Maddocks, Harvey Jonathan; Mader, Wolfgang; Madsen, Alexander; Maeno, Mayuko; Maeno, Tadashi; Magnoni, Luca; Magradze, Erekle; Mahboubi, Kambiz; Mahlstedt, Joern; Mahmoud, Sara; Maiani, Camilla; Maidantchik, Carmen; Maio, Amélia; Majewski, Stephanie; Makida, Yasuhiro; Makovec, Nikola; Mal, Prolay; Malaescu, Bogdan; Maldaner, Stephan; Malecki, Pawel; Maleev, Victor; Malek, Fairouz; Mallik, Usha; Malon, David; Malone, Caitlin; Maltezos, Stavros; Malyshev, Vladimir; Malyukov, Sergei; Mamuzic, Judita; Mandelli, Beatrice; Mandelli, Luciano; Mandić, Igor; Mandrysch, Rocco; Maneira, José; Manfredini, Alessandro; Manhaes de Andrade Filho, Luciano; Manjarres Ramos, Joany Andreina; Mann, Alexander; Manning, Peter; Manousakis-Katsikakis, Arkadios; Mansoulie, Bruno; Mantifel, Rodger; Mapelli, Livio; March, Luis; Marchand, Jean-Francois; Marchese, Fabrizio; Marchiori, Giovanni; Marcisovsky, Michal; Marino, Christopher; Marroquim, Fernando; Marshall, Zach; Marti, Lukas Fritz; Marti-Garcia, Salvador; Martin, Brian; Martin, Brian; Martin, Tim; Martin, Victoria Jane; Martin dit Latour, Bertrand; Martinez, Homero; Martinez, Mario; Martin-Haugh, Stewart; Martyniuk, Alex; Marx, Marilyn; Marzin, Antoine; Masetti, Lucia; Mashimo, Tetsuro; Mashinistov, Ruslan; Masik, Jiri; Maslennikov, Alexey; Massa, Ignazio; Massa, Lorenzo; Massol, Nicolas; Mastrandrea, Paolo; Mastroberardino, Anna; Masubuchi, Tatsuya; Matsunaga, Hiroyuki; Matsushita, Takashi; Mättig, Peter; Mättig, Stefan; Mattmann, Johannes; Mattravers, Carly; Maurer, Julien; Maxfield, Stephen; Maximov, Dmitriy; Mazini, Rachid; Mazzaferro, Luca; Mc Goldrick, Garrin; Mc Kee, Shawn Patrick; McCarn, Allison; McCarthy, Robert; McCarthy, Tom; Mcfayden, Josh; Mchedlidze, Gvantsa; Mclaughlan, Tom; McMahon, Steve; McPherson, Robert; Meade, Andrew; Mechnich, Joerg; Medinnis, Michael; Meehan, Samuel; Meera-Lebbai, Razzak; Meessen, Christophe; Mehlhase, Sascha; Mehta, Andrew; Meier, Karlheinz; Meineck, Christian; Meirose, Bernhard; Melachrinos, Constantinos; Mellado Garcia, Bruce Rafael; Meloni, Federico; Mendoza Navas, Luis; Mengarelli, Alberto; Menke, Sven; Meoni, Evelin; Mercurio, Kevin Michael; Mergelmeyer, Sebastian; Meric, Nicolas; Mermod, Philippe; Merola, Leonardo; Meroni, Chiara; Merritt, Frank; Merritt, Hayes; Messina, Andrea; Metcalfe, Jessica; Mete, Alaettin Serhan; Meyer, Carsten; Meyer, Christopher; Meyer, Jean-Pierre; Meyer, Jochen; Meyer, Joerg; Middleton, Robin; Migas, Sylwia; Mijović, Liza; Mikenberg, Giora; Mikestikova, Marcela; Mikuž, Marko; Miller, David; Mills, Corrinne; Milov, Alexander; Milstead, David; Milstein, Dmitry; Minaenko, Andrey; Miñano Moya, Mercedes; Minashvili, Irakli; Mincer, Allen; Mindur, Bartosz; Mineev, Mikhail; Ming, Yao; Mir, Lluisa-Maria; Mitani, Takashi; Mitrevski, Jovan; Mitsou, Vasiliki A; Mitsui, Shingo; Miucci, Antonio; Miyagawa, Paul; Mjörnmark, Jan-Ulf; Moa, Torbjoern; Moeller, Victoria; Mohapatra, Soumya; Molander, Simon; Moles-Valls, Regina; Mönig, Klaus; Monini, Caterina; Monk, James; Monnier, Emmanuel; Montejo Berlingen, Javier; Monticelli, Fernando; Monzani, Simone; Moore, Roger; Mora Herrera, Clemencia; Moraes, Arthur; Morange, Nicolas; Morel, Julien; Moreno, Deywis; Moreno Llácer, María; Morettini, Paolo; Morgenstern, Marcus; Morii, Masahiro; Moritz, Sebastian; Morley, Anthony Keith; Mornacchi, Giuseppe; Morris, John; Morvaj, Ljiljana; Moser, Hans-Guenther; Mosidze, Maia; Moss, Josh; Mount, Richard; Mountricha, Eleni; Moyse, Edward; Muanza, Steve; Mudd, Richard; Mueller, Felix; Mueller, James; Mueller, Klemens; Mueller, Thibaut; Mueller, Timo; Muenstermann, Daniel; Munwes, Yonathan; Murillo Garcia, Raul; Murillo Quijada, Javier Alberto; Murray, Bill; Mussche, Ido; Musto, Elisa; Myagkov, Alexey; Myska, Miroslav; Nackenhorst, Olaf; Nadal, Jordi; Nagai, Koichi; Nagai, Ryo; Nagai, Yoshikazu; Nagano, Kunihiro; Nagarkar, Advait; Nagasaka, Yasushi; Nagel, Martin; Nairz, Armin Michael; Nakahama, Yu; Nakamura, Koji; Nakamura, Tomoaki; Nakano, Itsuo; Namasivayam, Harisankar; Nanava, Gizo; Napier, Austin; Narayan, Rohin; Nash, Michael; Nattermann, Till; Naumann, Thomas; Navarro, Gabriela; Nayyar, Ruchika; Neal, Homer; Nechaeva, Polina; Neep, Thomas James; Negri, Andrea; Negri, Guido; Negrini, Matteo; Nektarijevic, Snezana; Nelson, Andrew; Nelson, Timothy Knight; Nemecek, Stanislav; Nemethy, Peter; Nepomuceno, Andre Asevedo; Nessi, Marzio; Neubauer, Mark; Neumann, Manuel; Neusiedl, Andrea; Neves, Ricardo; Nevski, Pavel; Newman, Paul; Nguyen, Duong Hai; Nguyen Thi Hong, Van; Nickerson, Richard; Nicolaidou, Rosy; Nielsen, Jason; Nikiforou, Nikiforos; Nikiforov, Andriy; Nikolaenko, Vladimir; Nikolaidis, Spyridon; Nikolic-Audit, Irena; Nikolics, Katalin; Nikolopoulos, Konstantinos; Nilsson, Paul; Ninomiya, Yoichi; Nisati, Aleandro; Nisius, Richard; Nobe, Takuya; Nodulman, Lawrence; Nomachi, Masaharu; Nomidis, Ioannis; Norberg, Scarlet; Nordberg, Markus; Nozaki, Mitsuaki; Nozka, Libor; Ntekas, Konstantinos; Nuncio-Quiroz, Adriana-Elizabeth; Nunes Hanninger, Guilherme; Nunnemann, Thomas; Nurse, Emily; Nuti, Francesco; O'Brien, Brendan Joseph; O'grady, Fionnbarr; O'Neil, Dugan; O'Shea, Val; Oakes, Louise Beth; Oakham, Gerald; Oberlack, Horst; Ocariz, Jose; Ochi, Atsuhiko; Ochoa, Ines; Oda, Susumu; Odaka, Shigeru; Ogren, Harold; Oh, Alexander; Oh, Seog; Ohm, Christian; Ohshima, Takayoshi; Ohshita, Hidetoshi; Okamura, Wataru; Okawa, Hideki; Okumura, Yasuyuki; Okuyama, Toyonobu; Olariu, Albert; Olivares Pino, Sebastian Andres; Oliveira Damazio, Denis; Oliver Garcia, Elena; Olivito, Dominick; Olszewski, Andrzej; Olszowska, Jolanta; Onofre, António; Onyisi, Peter; Oreglia, Mark; Oren, Yona; Orestano, Domizia; Orlando, Nicola; Oropeza Barrera, Cristina; Orr, Robert; Osculati, Bianca; Ospanov, Rustem; Otero y Garzon, Gustavo; Otono, Hidetoshi; Ouchrif, Mohamed; Ouellette, Eric; Ould-Saada, Farid; Ouraou, Ahmimed; Oussoren, Koen Pieter; Ouyang, Qun; Ovcharova, Ana; Owen, Mark; Owen, Simon; Ozcan, Veysi Erkcan; Ozturk, Nurcan; Pachal, Katherine; Pacheco Pages, Andres; Padilla Aranda, Cristobal; Pagan Griso, Simone; Paganis, Efstathios; Pahl, Christoph; Paige, Frank; Pais, Preema; Pajchel, Katarina; Palacino, Gabriel; Palestini, Sandro; Pallin, Dominique; Palma, Alberto; Palmer, Jody; Pan, Yibin; Panagiotopoulou, Evgenia; Panduro Vazquez, William; Panes, Boris; Pani, Priscilla; Panikashvili, Natalia; Panitkin, Sergey; Pantea, Dan; Papadopoulou, Theodora; Papageorgiou, Konstantinos; Paramonov, Alexander; Paredes Hernandez, Daniela; Parker, Michael Andrew; Parodi, Fabrizio; Parsons, John; Parzefall, Ulrich; Pasqualucci, Enrico; Passaggio, Stefano; Pastore, Francesca; Pásztor, Gabriella; Pataraia, Sophio; Patel, Nikhul; Pater, Joleen; Patricelli, Sergio; Pauly, Thilo; Pearce, James; Pedersen, Maiken; Pedraza Lopez, Sebastian; Pedro, Rute; Peleganchuk, Sergey; Pelikan, Daniel; Peng, Haiping; Penning, Bjoern; Penwell, John; Perepelitsa, Dennis; Perez Codina, Estel; Pérez García-Estañ, María Teresa; Perini, Laura; Pernegger, Heinz; Perrella, Sabrina; Peschke, Richard; Peshekhonov, Vladimir; Peters, Krisztian; Peters, Yvonne; Petersen, Brian; Petersen, Troels; Petit, Elisabeth; Petridis, Andreas; Petridou, Chariclia; Petrolo, Emilio; Petrucci, Fabrizio; Petteni, Michele; Pezoa, Raquel; Phillips, Peter William; Piacquadio, Giacinto; Pianori, Elisabetta; Picazio, Attilio; Piccaro, Elisa; Piccinini, Maurizio; Piec, Sebastian Marcin; Piegaia, Ricardo; Piendibene, Marco; Pignotti, David; Pilcher, James; Pilkington, Andrew; Pinamonti, Michele; Pinder, Alex; Pinfold, James; Pingel, Almut; Pinto, Belmiro; Pizio, Caterina; Pleier, Marc-Andre; Pleskot, Vojtech; Plotnikova, Elena; Plucinski, Pawel; Poddar, Sahill; Podlyski, Fabrice; Poettgen, Ruth; Poggioli, Luc; Pohl, David-leon; Pohl, Martin; Polesello, Giacomo; Policicchio, Antonio; Polifka, Richard; Polini, Alessandro; Pollard, Christopher Samuel; Polychronakos, Venetios; Pomeroy, Daniel; Pommès, Kathy; Pontecorvo, Ludovico; Pope, Bernard; Popeneciu, Gabriel Alexandru; Popovic, Dragan; Portell Bueso, Xavier; Pospisil, Stanislav; Potamianos, Karolos; Potrap, Igor; Potter, Christina; Potter, Christopher; Poveda, Joaquin; Pozdnyakov, Valery; Pozo Astigarraga, Mikel Eukeni; Prabhu, Robindra; Pralavorio, Pascal; Pranko, Aliaksandr; Prasad, Srivas; Pravahan, Rishiraj; Prell, Soeren; Price, Darren; Price, Joe; Price, Lawrence; Primavera, Margherita; Proissl, Manuel; Prokofiev, Kirill; Prokoshin, Fedor; Protopapadaki, Eftychia-sofia; Protopopescu, Serban; Proudfoot, James; Prudent, Xavier; Przybycien, Mariusz; Przysiezniak, Helenka; Psoroulas, Serena; Ptacek, Elizabeth; Pueschel, Elisa; Puldon, David; Purohit, Milind; Puzo, Patrick; Pylypchenko, Yuriy; Qian, Jianming; Qian, Weiming; Quadt, Arnulf; Quarrie, David; Quayle, William; Quilty, Donnchadha; Quinonez, Fernando; Radescu, Voica; Radhakrishnan, Sooraj Krishnan; Radloff, Peter; Ragusa, Francesco; Rahal, Ghita; Rajagopalan, Srinivasan; Rammensee, Michael; Rammes, Marcus; Randle-Conde, Aidan Sean; Rangel-Smith, Camila; Rao, Kanury; Rauscher, Felix; Rave, Stefan; Rave, Tobias Christian; Ravenscroft, Thomas; Raymond, Michel; Read, Alexander Lincoln; Rebuzzi, Daniela; Redelbach, Andreas; Redlinger, George; Reece, Ryan; Reeves, Kendall; Rehnisch, Laura; Reinsch, Andreas; Reisin, Hernan; Reiss, Andreas; Relich, Matthew; Rembser, Christoph; Renaud, Adrien; Rescigno, Marco; Resconi, Silvia; Rezanova, Olga; Reznicek, Pavel; Rezvani, Reyhaneh; Richter, Robert; Ridel, Melissa; Rieck, Patrick; Rijssenbeek, Michael; Rimoldi, Adele; Rinaldi, Lorenzo; Ritsch, Elmar; Riu, Imma; Rizatdinova, Flera; Rizvi, Eram; Robertson, Steven; Robichaud-Veronneau, Andree; Robinson, Dave; Robinson, James; Robson, Aidan; Rocha de Lima, Jose Guilherme; Roda, Chiara; Roda Dos Santos, Denis; Rodrigues, Luis; Roe, Shaun; Røhne, Ole; Romaniouk, Anatoli; Romano, Marino; Romeo, Gaston; Romero Adam, Elena; Romero Maltrana, Diego; Rompotis, Nikolaos; Roos, Lydia; Ros, Eduardo; Rosati, Stefano; Rosbach, Kilian; Rose, Anthony; Rose, Matthew; Rosendahl, Peter Lundgaard; Rosenthal, Oliver; Rossetti, Valerio; Rossi, Elvira; Rossi, Leonardo Paolo; Rosten, Rachel; Rotaru, Marina; Roth, Itamar; Rothberg, Joseph; Rousseau, David; Royon, Christophe; Rozanov, Alexandre; Rozen, Yoram; Ruan, Xifeng; Rubbo, Francesco; Rubinskiy, Igor; Rud, Viacheslav; Rudolph, Christian; Rudolph, Matthew Scott; Rühr, Frederik; Ruiz-Martinez, Aranzazu; Rurikova, Zuzana; Rusakovich, Nikolai; Ruschke, Alexander; Rutherfoord, John; Ruthmann, Nils; Ruzicka, Pavel; Ryabov, Yury; Rybar, Martin; Rybkin, Grigori; Ryder, Nick; Saavedra, Aldo; Sacerdoti, Sabrina; Saddique, Asif; Sadeh, Iftach; Sadrozinski, Hartmut; Sadykov, Renat; Safai Tehrani, Francesco; Sakamoto, Hiroshi; Sakurai, Yuki; Salamanna, Giuseppe; Salamon, Andrea; Saleem, Muhammad; Salek, David; Sales De Bruin, Pedro Henrique; Salihagic, Denis; Salnikov, Andrei; Salt, José; Salvatore, Daniela; Salvatore, Pasquale Fabrizio; Salvucci, Antonio; Salzburger, Andreas; Sampsonidis, Dimitrios; Sanchez, Arturo; Sánchez, Javier; Sanchez Martinez, Victoria; Sandaker, Heidi; Sander, Heinz Georg; Sanders, Michiel; Sandhoff, Marisa; Sandoval, Tanya; Sandoval, Carlos; Sandstroem, Rikard; Sankey, Dave; Sansoni, Andrea; Santoni, Claudio; Santonico, Rinaldo; Santos, Helena; Santoyo Castillo, Itzebelt; Sapp, Kevin; Sapronov, Andrey; Saraiva, João; Sarkisyan-Grinbaum, Edward; Sarrazin, Bjorn; Sartisohn, Georg; Sasaki, Osamu; Sasaki, Yuichi; Sauvan, Emmanuel; Sauvan, Jean-Baptiste; Savage, Graham; Savard, Pierre; Savu, Dan Octavian; Sawyer, Craig; Sawyer, Lee; Saxon, James; Sbarra, Carla; Sbrizzi, Antonio; Scanlon, Tim; Scannicchio, Diana; Scarcella, Mark; Schaarschmidt, Jana; Schacht, Peter; Schaefer, Douglas; Schaeffer, Jan; Schaelicke, Andreas; Schaepe, Steffen; Schaetzel, Sebastian; Schäfer, Uli; Schaffer, Arthur; Schaile, Dorothee; Schamberger, R~Dean; Scharf, Veit; Schegelsky, Valery; Scheirich, Daniel; Schernau, Michael; Scherzer, Max; Schettino, Vinicius; Schiavi, Carlo; Schieck, Jochen; Schillo, Christian; Schioppa, Marco; Schlenker, Stefan; Schmidt, Evelyn; Schmieden, Kristof; Schmitt, Christian; Schmitt, Christopher; Schmitt, Klaus; Schmitt, Sebastian; Schneider, Basil; Schnellbach, Yan Jie; Schnoor, Ulrike; Schoeffel, Laurent; Schoening, Andre; Schoenrock, Bradley Daniel; Schorlemmer, Andre Lukas; Schott, Matthias; Schouten, Doug; Schovancova, Jaroslava; Schramm, Steven; Schreyer, Manuel; Schroeder, Christian; Schroer, Nicolai; Schuh, Natascha; Schultens, Martin Johannes; Schultz-Coulon, Hans-Christian; Schulz, Holger; Schumacher, Markus; Schumm, Bruce; Schune, Philippe; Schwartzman, Ariel; Schwegler, Philipp; Schwemling, Philippe; Schwienhorst, Reinhard; Schwindling, Jerome; Schwindt, Thomas; Schwoerer, Maud; Sciacca, Gianfranco; Scifo, Estelle; Sciolla, Gabriella; Scott, Bill; Scuri, Fabrizio; Scutti, Federico; Searcy, Jacob; Sedov, George; Sedykh, Evgeny; Seidel, Sally; Seiden, Abraham; Seifert, Frank; Seixas, José; Sekhniaidze, Givi; Sekula, Stephen; Selbach, Karoline Elfriede; Seliverstov, Dmitry; Sellers, Graham; Semprini-Cesari, Nicola; Serfon, Cedric; Serin, Laurent; Serkin, Leonid; Serre, Thomas; Seuster, Rolf; Severini, Horst; Sforza, Federico; Sfyrla, Anna; Shabalina, Elizaveta; Shamim, Mansoora; Shan, Lianyou; Shank, James; Shao, Qi Tao; Shapiro, Marjorie; Shatalov, Pavel; Shaw, Kate; Shehu, Ciwake Yusufu; Sherwood, Peter; Shimizu, Shima; Shimmin, Chase Owen; Shimojima, Makoto; Shiyakova, Mariya; Shmeleva, Alevtina; Shochet, Mel; Shooltz, Dean; Short, Daniel; Shrestha, Suyog; Shulga, Evgeny; Shupe, Michael; Shushkevich, Stanislav; Sicho, Petr; Sicoe, Alexandru Dan; Sidiropoulou, Ourania; Sidorov, Dmitri; Sidoti, Antonio; Siegert, Frank; Sijacki, Djordje; Silbert, Ohad; Silva, José; Silva Oliveira, Marcos Vinicius; Silver, Yiftah; Silverstein, Daniel; Silverstein, Samuel; Simak, Vladislav; Simard, Olivier; Simic, Ljiljana; Simion, Stefan; Simioni, Eduard; Simmons, Brinick; Simoniello, Rosa; Simonyan, Margar; Sinervo, Pekka; Sinev, Nikolai; Sipica, Valentin; Siragusa, Giovanni; Sircar, Anirvan; Sivoklokov, Serguei; Siyad, Mohamed Jimcaale; Sjölin, Jörgen; Sjursen, Therese; Skinnari, Louise Anastasia; Skottowe, Hugh Philip; Skovpen, Kirill; Skubic, Patrick; Slater, Mark; Slavicek, Tomas; Sliwa, Krzysztof; Smakhtin, Vladimir; Smart, Ben; Smestad, Lillian; Smirnov, Sergei; Smirnov, Yury; Smirnova, Lidia; Smirnova, Oxana; Smizanska, Maria; Smolek, Karel; Snesarev, Andrei; Snidero, Giacomo; Snow, Joel; Snyder, Scott; Sobie, Randall; Socher, Felix; Soffer, Abner; Soh, Dart-yin; Solans, Carlos; Solar, Michael; Solc, Jaroslav; Soldatov, Evgeny; Soldevila, Urmila; Solfaroli Camillocci, Elena; Solodkov, Alexander; Soloviev, Igor; Solovyanov, Oleg; Solovyev, Victor; Soni, Nitesh; Sood, Alexander; Sopko, Bruno; Sopko, Vit; Sorin, Veronica; Sosebee, Mark; Sotiropoulou, Calliope Louisa; Soualah, Rachik; Soueid, Paul; Soukharev, Andrey; South, David; Spagnolo, Stefania; Spanò, Francesco; Spearman, William Robert; Spighi, Roberto; Spigo, Giancarlo; Spiwoks, Ralf; Spousta, Martin; Spreitzer, Teresa; St Denis, Richard Dante; Stabile, Alberto; Stahlman, Jonathan; Staley, Richard; Stamen, Rainer; Stanecka, Ewa; Stanek, Robert; Stanescu, Cristian; Stanescu-Bellu, Madalina; Stanitzki, Marcel Michael; Stapnes, Steinar; Starchenko, Evgeny; Stark, Jan; Staroba, Pavel; Starovoitov, Pavel; Staszewski, Rafal; Steele, Genevieve; Steinbach, Peter; Steinberg, Peter; Stelzer, Bernd; Stelzer, Harald Joerg; Stelzer-Chilton, Oliver; Stenzel, Hasko; Stern, Sebastian; Stewart, Graeme; Stillings, Jan Andre; Stockton, Mark; Stoebe, Michael; Stoerig, Kathrin; Stoicea, Gabriel; Stonjek, Stefan; Stradling, Alden; Straessner, Arno; Strandberg, Jonas; Strandberg, Sara; Strauss, Emanuel; Strauss, Michael; Strizenec, Pavol; Ströhmer, Raimund; Strom, David; Stroynowski, Ryszard; Stucci, Stefania Antonia; Stugu, Bjarne; Stupak, John; Styles, Nicholas Adam; Su, Dong; Su, Jun; Subramania, Halasya Siva; Subramaniam, Rajivalochan; Succurro, Antonella; Sugaya, Yorihito; Suhr, Chad; Suk, Michal; Sulin, Vladimir; Sultansoy, Saleh; Sumida, Toshi; Sun, Xiaohu; Sundermann, Jan Erik; Suruliz, Kerim; Sutton, Mark; Suzuki, Yu; Svatos, Michal; Swedish, Stephen; Swiatlowski, Maximilian; Sykora, Ivan; Sykora, Tomas; Ta, Duc; Tackmann, Kerstin; Taenzer, Joe; Taffard, Anyes; Tafirout, Reda; Taghavirad, Saeed; Taiblum, Nimrod; Takahashi, Yuta; Takai, Helio; Takashima, Ryuichi; Takeda, Hiroshi; Takeshita, Tohru; Takubo, Yosuke; Talby, Mossadek; Talyshev, Alexey; Tam, Jason; Tamsett, Matthew; Tan, Kong Guan; Tanaka, Junichi; Tanaka, Reisaburo; Tanaka, Shuji; Tanasijczuk, Andres Jorge; Tani, Kazutoshi; Tannoury, Nancy; Tapprogge, Stefan; Tarem, Shlomit; Tarrade, Fabien; Tartarelli, Giuseppe Francesco; Tas, Petr; Tasevsky, Marek; Tashiro, Takuya; Tassi, Enrico; Tavares Delgado, Ademar; Tayalati, Yahya; Taylor, Christopher; Taylor, Frank; Taylor, Geoffrey; Taylor, Wendy; Teischinger, Florian Alfred; Teixeira Dias Castanheira, Matilde; Teixeira-Dias, Pedro; Temming, Kim Katrin; Ten Kate, Herman; Teng, Ping-Kun; Terada, Susumu; Terashi, Koji; Terron, Juan; Terzo, Stefano; Testa, Marianna; Teuscher, Richard; Therhaag, Jan; Theveneaux-Pelzer, Timothée; Thoma, Sascha; Thomas, Juergen; Thomas-Wilsker, Joshuha; Thompson, Emily; Thompson, Paul; Thompson, Peter; Thompson, Stan; Thomsen, Lotte Ansgaard; Thomson, Evelyn; Thomson, Mark; Thong, Wai Meng; Tian, Feng; Tibbetts, Mark James; Tikhomirov, Vladimir; Tikhonov, Yury; Timoshenko, Sergey; Tiouchichine, Elodie; Tipton, Paul; Tisserant, Sylvain; Todorov, Theodore; Todorova-Nova, Sharka; Toggerson, Brokk; Tojo, Junji; Tokár, Stanislav; Tokushuku, Katsuo; Tollefson, Kirsten; Tomlinson, Lee; Tomoto, Makoto; Tompkins, Lauren; Toms, Konstantin; Torrence, Eric; Torres, Heberth; Torró Pastor, Emma; Toth, Jozsef; Touchard, Francois; Tovey, Daniel; Tran, Huong Lan; Trefzger, Thomas; Tremblet, Louis; Tricoli, Alessandro; Trigger, Isabel Marian; Trincaz-Duvoid, Sophie; Tripiana, Martin; Triplett, Nathan; Trischuk, William; Trocmé, Benjamin; Troncon, Clara; Trottier-McDonald, Michel; Trovatelli, Monica; True, Patrick; Trzebinski, Maciej; Trzupek, Adam; Tsarouchas, Charilaos; Tseng, Jeffrey; Tsiareshka, Pavel; Tsionou, Dimitra; Tsipolitis, Georgios; Tsirintanis, Nikolaos; Tsiskaridze, Shota; Tsiskaridze, Vakhtang; Tskhadadze, Edisher; Tsukerman, Ilya; Tsulaia, Vakhtang; Tsung, Jieh-Wen; Tsuno, Soshi; Tsybychev, Dmitri; Tua, Alan; Tudorache, Alexandra; Tudorache, Valentina; Tuna, Alexander Naip; Tupputi, Salvatore; Turchikhin, Semen; Turecek, Daniel; Turra, Ruggero; Tuts, Michael; Twomey, Matthew Shaun; Tykhonov, Andrii; Tylmad, Maja; Uchida, Kirika; Ueda, Ikuo; Ueno, Ryuichi; Ughetto, Michael; Ugland, Maren; Uhlenbrock, Mathias; Ukegawa, Fumihiko; Unal, Guillaume; Undrus, Alexander; Unel, Gokhan; Ungaro, Francesca; Unno, Yoshinobu; Urbaniec, Dustin; Urquijo, Phillip; Urrejola, Pedro; Usai, Giulio; Usanova, Anna; Vacavant, Laurent; Vacek, Vaclav; Vachon, Brigitte; Valencic, Nika; Valentinetti, Sara; Valero, Alberto; Valery, Loic; Valkar, Stefan; Valladolid Gallego, Eva; Vallecorsa, Sofia; Valls Ferrer, Juan Antonio; Van Der Deijl, Pieter; van der Geer, Rogier; van der Graaf, Harry; Van Der Leeuw, Robin; van der Ster, Daniel; van Eldik, Niels; van Gemmeren, Peter; Van Nieuwkoop, Jacobus; van Vulpen, Ivo; van Woerden, Marius Cornelis; Vanadia, Marco; Vandelli, Wainer; Vaniachine, Alexandre; Vankov, Peter; Vannucci, Francois; Vardanyan, Gagik; Vari, Riccardo; Varnes, Erich; Varol, Tulin; Varouchas, Dimitris; Vartapetian, Armen; Varvell, Kevin; Vassilakopoulos, Vassilios; Vazeille, Francois; Vazquez Schroeder, Tamara; Veatch, Jason; Veloso, Filipe; Veneziano, Stefano; Ventura, Andrea; Ventura, Daniel; Venturi, Manuela; Venturi, Nicola; Venturini, Alessio; Vercesi, Valerio; Verducci, Monica; Verkerke, Wouter; Vermeulen, Jos; Vest, Anja; Vetterli, Michel; Viazlo, Oleksandr; Vichou, Irene; Vickey, Trevor; Vickey Boeriu, Oana Elena; Viehhauser, Georg; Vieira De Souza, Julio; Viel, Simon; Vigne, Ralph; Villa, Mauro; Villaplana Perez, Miguel; Vilucchi, Elisabetta; Vincter, Manuella; Vinogradov, Vladimir; Virzi, Joseph; Vitells, Ofer; Vivarelli, Iacopo; Vives Vaque, Francesc; Vlachos, Sotirios; Vladoiu, Dan; Vlasak, Michal; Vogel, Adrian; Vokac, Petr; Volpi, Guido; Volpi, Matteo; von der Schmitt, Hans; von Radziewski, Holger; von Toerne, Eckhard; Vorobel, Vit; Vos, Marcel; Voss, Rudiger; Vossebeld, Joost; Vranjes, Nenad; Vranjes Milosavljevic, Marija; Vrba, Vaclav; Vreeswijk, Marcel; Vu Anh, Tuan; Vuillermet, Raphael; Vukotic, Ilija; Vykydal, Zdenek; Wagner, Peter; Wagner, Wolfgang; Wahrmund, Sebastian; Wakabayashi, Jun; Walder, James; Walker, Rodney; Walkowiak, Wolfgang; Wall, Richard; Waller, Peter; Walsh, Brian; Wang, Chao; Wang, Chiho; Wang, Haichen; Wang, Hulin; Wang, Jike; Wang, Jin; Wang, Kuhan; Wang, Rui; Wang, Song-Ming; Wang, Tan; Wang, Xiaoxiao; Warburton, Andreas; Ward, Patricia; Wardrope, David Robert; Washbrook, Andrew; Wasicki, Christoph; Watanabe, Ippei; Watkins, Peter; Watson, Alan; Watson, Ian; Watson, Miriam; Watts, Gordon; Watts, Stephen; Waugh, Ben; Webb, Samuel; Weber, Michele; Weber, Stefan Wolf; Webster, Jordan S; Weidberg, Anthony; Weigell, Philipp; Weingarten, Jens; Weiser, Christian; Weits, Hartger; Wells, Phillippa; Wenaus, Torre; Wendland, Dennis; Weng, Zhili; Wengler, Thorsten; Wenig, Siegfried; Wenzel, Volker; Wermes, Norbert; Werner, Matthias; Werner, Per; Wessels, Martin; Wetter, Jeffrey; Whalen, Kathleen; White, Andrew; White, Martin; White, Ryan; Whiteson, Daniel; Whittington, Denver; Wickens, Fred; Wiedenmann, Werner; Wielers, Monika; Wienemann, Peter; Wiglesworth, Craig; Wiik-Fuchs, Liv Antje Mari; Wijeratne, Peter Alexander; Wildauer, Andreas; Wildt, Martin Andre; Wilkens, Henric George; Will, Jonas Zacharias; Williams, Hugh; Williams, Sarah; Willocq, Stephane; Wilson, Alan; Wilson, John; Wingerter-Seez, Isabelle; Winkelmann, Stefan; Winklmeier, Frank; Wittgen, Matthias; Wittig, Tobias; Wittkowski, Josephine; Wollstadt, Simon Jakob; Wolter, Marcin Wladyslaw; Wolters, Helmut; Wosiek, Barbara; Wotschack, Jorg; Woudstra, Martin; Wozniak, Krzysztof; Wraight, Kenneth; Wright, Michael; Wu, Sau Lan; Wu, Xin; Wu, Yusheng; Wulf, Evan; Wyatt, Terry Richard; Wynne, Benjamin; Xella, Stefania; Xiao, Meng; Xu, Da; Xu, Lailin; Yabsley, Bruce; Yacoob, Sahal; Yamada, Miho; Yamaguchi, Hiroshi; Yamaguchi, Yohei; Yamamoto, Akira; Yamamoto, Kyoko; Yamamoto, Shimpei; Yamamura, Taiki; Yamanaka, Takashi; Yamauchi, Katsuya; Yamazaki, Yuji; Yan, Zhen; Yang, Haijun; Yang, Hongtao; Yang, Un-Ki; Yang, Yi; Yanush, Serguei; Yao, Liwen; Yasu, Yoshiji; Yatsenko, Elena; Yau Wong, Kaven Henry; Ye, Jingbo; Ye, Shuwei; Yen, Andy L; Yildirim, Eda; Yilmaz, Metin; Yoosoofmiya, Reza; Yorita, Kohei; Yoshida, Rikutaro; Yoshihara, Keisuke; Young, Charles; Young, Christopher John; Youssef, Saul; Yu, David Ren-Hwa; Yu, Jaehoon; Yu, Jiaming; Yu, Jie; Yuan, Li; Yurkewicz, Adam; Zabinski, Bartlomiej; Zaidan, Remi; Zaitsev, Alexander; Zaman, Aungshuman; Zambito, Stefano; Zanello, Lucia; Zanzi, Daniele; Zaytsev, Alexander; Zeitnitz, Christian; Zeman, Martin; Zemla, Andrzej; Zengel, Keith; Zenin, Oleg; Ženiš, Tibor; Zerwas, Dirk; Zevi della Porta, Giovanni; Zhang, Dongliang; Zhang, Huaqiao; Zhang, Jinlong; Zhang, Lei; Zhang, Xueyao; Zhang, Zhiqing; Zhao, Zhengguo; Zhemchugov, Alexey; Zhong, Jiahang; Zhou, Bing; Zhou, Lei; Zhou, Ning; Zhu, Cheng Guang; Zhu, Hongbo; Zhu, Junjie; Zhu, Yingchun; Zhuang, Xuai; Zibell, Andre; Zieminska, Daria; Zimine, Nikolai; Zimmermann, Christoph; Zimmermann, Robert; Zimmermann, Simone; Zimmermann, Stephanie; Zinonos, Zinonas; Ziolkowski, Michael; Zobernig, Georg; Zoccoli, Antonio; zur Nedden, Martin; Zurzolo, Giovanni; Zutshi, Vishnu; Zwalinski, Lukasz; CERN. Geneva. The LHC experiments Committee; LHCC

    2013-01-01

    The Phase-I upgrade of the ATLAS Trigger and Data Acquisition (TDAQ) system is to allow the ATLAS experiment to efficiently trigger and record data at instantaneous luminosities that are up to three times that of the original LHC design while maintaining trigger thresholds close to those used in the initial run of the LHC.

  20. Design of A District Heating System Including The Upgrading of Residual Industrial Waste Heat

    NARCIS (Netherlands)

    Falcao, P.W.; Mesbah, A.; Suherman, M.V.; Wennekes, S.

    2005-01-01

    This study was aimed to evaluate the feasibility of using a waste heat stream from DSM for a District Heating System. A conceptual design was carried out with emphasis on the unit for upgrading the residual waste heat. Having reviewed heat pump technology, mechanical heat pump was found to be the

  1. The BEACON on-line core monitoring system. Functional upgrades and applications

    International Nuclear Information System (INIS)

    Boyd, W.A.; Miller, R.W.

    1997-01-01

    The BEACON TM core monitor system has been in commercial operation since 1989 and was licensed by the USNRC for on-line core power distribution and thermal power limit monitoring in 1994. Since that time BEACON has been installed at 17 plants. Each of these customers has a different perspective on the use of data from BEACON and a different approach on the application of BEACON to support their plant operations. To support these varied needs and approaches the BEACON system has been divided into three operational levels to better match the system functions to the customer needs and approaches to system integration. Based on customer feedback, the BEACON system was upgraded in some areas and streamlined in other areas to better support the needs of each customer. The three operational levels of the BEACON system, the major product upgrades and system evolution that has taken place to support the needs and applications of our customers are discussed. (authors)

  2. Ageing investigation and upgrading of components/systems of Kartini research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Syarip,; Setiawan, Widi [Yogyakarta Nuclear Research Centre, Yogyakarta (Indonesia)

    1998-10-01

    Kartini research reactor has been operated in good condition and has demonstrated successful operation for the past 18 years, utilized for: reactor kinetic and control studies, instrumentation tests, neutronic and thermohydraulic studies, routine neutron activation analysis, reactor safety studies, training for research reactor operators and supervisors, and reactor physics experiments. Several components of Kartini reactor use components from the abandoned IRT-2000 Project at Serpong and from Bandung Reactor Centre such as: reactor tank, reactor core, heat exchanger, motor blower for ventilation system, fuel elements, etc. To maintain a good operating performance and also for aging investigation purposes, the component failure data collection has been done. The method used is based on the Manual on Reliability Data Collection For Research Reactor PSAs, IAEA TECDOC 636, and analyzed by using Data Entry System (DES) computer code. Analysis result shows that the components/systems failure rate of Kartini reactor is around 1,5.10{sup -4} up to 2,8.10{sup -4} per hour, these values are within the ranges of the values indicated in IAEA TECDOC 478. Whereas from the analysis of irradiation history shows that the neutron fluence of fuel element with highest burn-up (2,05 gram U-235 in average) is around 1.04.10{sup 16} n Cm{sup -2} and this value is still far below its limiting value. Some reactor components/systems have been replaced and upgraded such as heat exchanger, instrumentation and control system (ICS), etc. The new reactor ICS was installed in 1994 which is designed as a distributed structure by using microprocessor based systems and bus system technology. The characteristic and operating performance of the new reactor ICS, as well as the operation history and improvement of the Kartini research reactor is presented. (J.P.N.)

  3. Machine and plasma diagnostic instrumentation systems for the Tandem Mirror Experiment Upgrade

    International Nuclear Information System (INIS)

    Coutts, G.W.; Coffield, F.E.; Lang, D.D.; Hornady, R.S.

    1981-01-01

    To evaluate performance of a second generation Tandem Mirror Machine, an extensive instrumentation system is being designed and installed as part of the major device fabrication. The systems listed will be operational during the start-up phase of the TMX Upgrade machine and provide bench marks for future performance data. In addition to plasma diagnostic instrumentation, machine parameter monitoring systems will be installed prior to machine operation. Simultaneous recording of machine parameters will permit evaluation of plasma parameters sensitive to machine conditions

  4. Benefits of Advanced Control Room Technologies: Phase One Upgrades to the HSSL, Research Plan, and Performance Measures

    Energy Technology Data Exchange (ETDEWEB)

    Le Blanc, Katya [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States); Rice, Brandon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Ulrich, Thomas [Idaho National Lab. (INL), Idaho Falls, ID (United States); Boring, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.

  5. Ion cyclotron resonance heating systems upgrade toward high power and CW operations in WEST

    Energy Technology Data Exchange (ETDEWEB)

    Hillairet, Julien, E-mail: julien.hillairet@cea.fr; Mollard, Patrick; Bernard, Jean-Michel; Argouarch, Arnaud; Berger-By, Gilles; Charabot, Nicolas; Colas, Laurent; Delaplanche, Jean-Marc; Ekedahl, Annika; Fedorczak, Nicolas; Ferlay, Fabien; Goniche, Marc; Hatchressian, Jean-Claude; Helou, Walid; Jacquot, Jonathan; Joffrin, Emmanuel; Litaudon, Xavier; Lombard, Gilles; Magne, Roland; Patterlini, Jean-Claude [CEA, IRFM, F-13108 Saint Paul-lez-Durance (France); and others

    2015-12-10

    The design of the WEST (Tungsten-W Environment in Steady-state Tokamak) Ion cyclotron resonance heating antennas is based on a previously tested conjugate-T Resonant Double Loops prototype equipped with internal vacuum matching capacitors. The design and construction of three new WEST ICRH antennas are being carried out in close collaboration with ASIPP, within the framework of the Associated Laboratory in the fusion field between IRFM and ASIPP. The coupling performance to the plasma and the load-tolerance have been improved, while adding Continuous Wave operation capability by introducing water cooling in the entire antenna. On the generator side, the operation class of the high power tetrodes is changed from AB to B in order to allow high power operation (up to 3 MW per antenna) under higher VSWR (up to 2:1). Reliability of the generators is also improved by increasing the cavity breakdown voltage. The control and data acquisition system is also upgraded in order to resolve and react on fast events, such as ELMs. A new optical arc detection system comes in reinforcement of the V{sub r}/V{sub f} and SHAD systems.

  6. OVERVIEW OF A RECONFIGURABLE SIMULATOR FOR MAIN CONTROL ROOM UPGRADES IN NUCLEAR POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    Ronald L. Boring

    2012-10-01

    This paper provides background on a reconfigurable control room simulator for nuclear power plants. The main control rooms in current nuclear power plants feature analog technology that is growing obsolete. The need to upgrade control rooms serves the practical need of maintainability as well as the opportunity to implement newer digital technologies with added functionality. There currently exists no dedicated research simulator for use in human factors design and evaluation activities for nuclear power plant modernization in the U.S. The new research simulator discussed in this paper provides a test bed in which operator performance on new control room concepts can be benchmarked against existing control rooms and in which new technologies can be validated for safety and usability prior to deployment.

  7. Real-time feedback control of the plasma density profile on ASDEX Upgrade

    International Nuclear Information System (INIS)

    Mlynek, A.; Reich, M.; Giannone, L.; Treutterer, W.; Behler, K.; Blank, H.; Buhler, A.; Cole, R.; Eixenberger, H.; Fischer, R.; Lohs, A.; Lueddecke, K.; Merkel, R.; Neu, G.; Ryter, F.; Zasche, D.

    2011-01-01

    The spatial distribution of density in a fusion experiment is of significant importance as it enters in numerous analyses and contributes to the fusion performance. The reconstruction of the density profile is therefore commonly done in offline data analysis. In this paper, we present an algorithm which allows for density profile reconstruction from the data of the submillimetre interferometer and the magnetic equilibrium in real-time. We compare the obtained results to the profiles yielded by a numerically more complex offline algorithm. Furthermore, we present recent ASDEX Upgrade experiments in which we used the real-time density profile for active feedback control of the shape of the density profile.

  8. Cost-effective instrumentation and control upgrades for commercial nuclear power plants surety principles developed at Sandia National Laboratories

    International Nuclear Information System (INIS)

    Rochau, G.E.; Dalton, L.J.

    1998-01-01

    Many nuclear power plants use instrument and control systems based on analog electronics. The state of the art in process control and instrumentation has advanced to use digital electronics and incorporate advanced technology. This technology includes: distributed microprocessors, fiber optics, intelligent systems (neutral networks), and advanced displays. The technology is used to optimize processes and enhance the man-machine interface while maintaining control and safety of the processes. Nuclear power plant operators have been hesitant to install this technology because of the cost and uncertainty in the regulatory process. This technology can be directly applied in an operating nuclear power plant provided a surety principle-based 'administrator' hardware system is included in parallel with the upgrade. Sandia National Laboratories has developed a rigorous approach to High Consequence System Surety (HCSS). This approach addresses the key issues of safety, security, and control while satisfying requirements for reliability and quality. We believe that HCSS principles can be applied to nuclear power plants in a manner that allows the off-the-shelf use of process control instrumentation while maintaining a high level of safety and enhancing the plant performance. We propose that an HCSS Administrator be constructed as a standardized approach to address regulatory issues. Such an administrator would allow a plant control system to be constructed with commercially available, state-to-the-art equipment and be customized to the needs of the individual plant operator. (author)

  9. Cost-effective instrumentation and control upgrades for commercial nuclear power plants using surety principles developed at Sandia National Laboratories

    International Nuclear Information System (INIS)

    Rochau, G.E.; Dalton, L.J.

    1997-01-01

    Many nuclear power plants use instrument and control systems based on analog electronics. The state of the art in process control and instrumentation has advanced to use digital electronics and incorporate advanced technology. This technology includes distributed microprocessors, fiber optics, intelligent systems (neural networks), and advanced displays. The technology is used to optimize processes and enhance the man-machine interface while maintaining control and safety of the processes. Nuclear power plant operators have been hesitant to install this technology because of the cost and uncertainty in the regulatory process. This technology can be directly applied in an operating nuclear power plant provided a surety principle-based open-quotes administratorclose quotes hardware system is included in parallel with the upgrade Sandia National Laboratories has developed a rigorous approach to High Consequence System Surety (HCSS). This approach addresses the key issues of safety, security, and control while satisfying requirements for reliability and quality. HCSS principles can be applied to nuclear power plants in a manner that allows the off-the-shelf use of process control instrumentation while maintaining a high level of safety and enhancing the plant performance. We propose that an HCSS administrator be constructed as a standardized approach to address regulatory issues. Such an administrator would allow a plant control system to be constructed with commercially available, state-of-the-art equipment and be customized to the needs of the individual plant operator

  10. Electrical design of the BUSSARD inverter system for ASDEX upgrade saddle coils

    Energy Technology Data Exchange (ETDEWEB)

    Teschke, Markus, E-mail: teschke@ipp.mpg.de; Arden, Nils; Eixenberger, Horst; Rott, Michael; Suttrop, Wolfgang

    2015-10-15

    Highlights: • A cost effective inverter topology for AUG's 16 in-vessel saddle coils has been found. • Use of commercially available power modules is possible. • A NPC-like topology of the power stage is realized in a modular way. • The high-speed controllers and PWM engines are realized on Linux-based systems. • First experimental results of AUG plasma shots are presented. - Abstract: A set of 16 in-vessel saddle coils is installed in the ASDEX Upgrade (AUG) nuclear fusion experiment for mitigation of edge localized modes (ELM) and feedback control of resistive wall modes (RWM). The coils were driven by DC current only during previous campaigns. Now, a new inverter system “BUSSARD” (German abbr. for “Bayerischer Umrichter, schnell schaltend für AUGs rasche Drehfelder”, translated: “bavarian fast switching inverter for AUG's fast rotating fields”) is built for the experiment. A four-phase system has been assembled to simultaneously operate up to 4 groups of coils consisting of up to 4 serial-connected coils each. The maximum current is 1.3 kA with a ripple in the range of 7% and the frequency is variable between DC and approx. 100 Hz. The switching frequency is variable between approximately 3 and 10 kHz. As a first application, rotating fields are generated. The system can be enhanced in two stages to 16-phase operation with a bandwidth of 500 Hz and a 24 phase system with a bandwidth of up to 3 kHz.

  11. Possible scenarios for a safety upgrade of the ventilation system

    CERN Document Server

    Inigo-Golfin, J

    2009-01-01

    This paper/presentation describes the existing LHC ventilation (HVAC) system, the design principle followed for the LEP Project and the modifications implemented for the LHC Project. A discussion on possible referential standards to compare the existing system with is presented and possible axes for its improvement, based on these referentials, are discussed. Finally, some recommendations are given based on the system's present capabilities and the estimated investment necessary to achieve compliance to the referentials chosen.

  12. Upgrade of the protection system for superconducting circuits in the LHC

    CERN Document Server

    Denz, R; Formenti, F; Meß, K H; Siemko, A; Steckert, J; Walckiers, L; Strait, J

    2010-01-01

    Prior to the re-start of the Large Hadron Collider LHC in 2009 the protection system for superconducting magnets and bus-bars QPS will be substantially upgraded. The foreseen modifications will enhance the capability of the system in detecting problems related to the electrical interconnections between superconducting magnets as well as the detection of so-called aperture symmetric quenches in the LHC main magnets.

  13. Upgrade of the protection system for superconducting circuits in the LHC

    OpenAIRE

    Denz, R; Dahlerup-Petersen, K; Formenti, F; Meß, K H; Siemko, A; Steckert, J; Walckiers, L; Strait, J

    2009-01-01

    Prior to the re-start of the Large Hadron Collider LHC in 2009 the protection system for superconducting magnets and bus-bars QPS will be substantially upgraded. The foreseen modifications will enhance the capability of the system in detecting problems related to the electrical interconnections between superconducting magnets as well as the detection of so-called aperture symmetric quenches in the LHC main magnets.

  14. SLAC Scanner Processor applications in the data acquisition system for the upgraded Mark II detector

    International Nuclear Information System (INIS)

    Barklow, T.; Glanzman, T.; Lankford, A.J.; Riles, K.

    1985-09-01

    The SLAC Scanner Processor is a general purpose, programmable FASTBUS crate/cable master/slave module. This device plays a central role in the readout, buffering and pre-processing of data from the upgraded Mark II detector's new central drift chamber. In addition to data readout, the SSPs assist in a variety of other services, such as detector calibration, FASTBUS system management, FASTBUS system initialization and verification, and FASTBUS module testing. 9 refs., 1 fig., 2 tabs

  15. Quality control and batch testing of MRPC modules for BESIII ETOF upgrade

    Science.gov (United States)

    Liu, Z.; Li, X.; Sun, Y. J.; Li, C.; Heng, Y. K.; Chen, T. X.; Dai, H. L.; Shao, M.; Sun, S. S.; Tang, Z. B.; Yang, R. X.; Wu, Z.; Wang, X. Z.

    2017-12-01

    The end-cap time-of-flight (ETOF) system for the Beijing Spectrometer III (BESIII) has been upgraded using the Multi-gap Resistive Plate Chamber (MRPC) technology (Williams et al., 1999; Li et al., 2001; Blanco et al., 2003; Fonte et al., 2013, [1-4]). A set of quality-assurance procedures has been developed to guarantee the performances of the 72 mass-produced MRPC modules installed. The cosmic ray batch testing show that the average detection efficiency of the MRPC modules is about 95%. Two different calibration methods indicate that MRPCs' time resolution can reach 60 ps in the cosmic ray test.

  16. RF Power Detector/Monitor Upgrade for the 500MHz Systems at the ALS

    International Nuclear Information System (INIS)

    Baptiste, K.

    2003-01-01

    Several systems rely on the accurate and linear detection of 500 MHz signals, (the fundamental frequency of both the Booster Ring and Storage Ring) over a dynamic range in excess of 25dB. Prior to this upgrade, the detector/monitor was diode based and though this type of detector could handle the dynamic range requirement it could not do so in an accurate and linear manner. In order to meet the requirements (dynamic range greater than or equal to 25dB, accurate and linear to +-0.25dB over the range, and additional circuitry to interface to the legacy control system and interlocks), a new RF Power Detector/Monitor has been developed using two AD8361, Analog Devices Tru RMS Detectors and a fuzzy comparator, which extends the overall detector's range to twice that of the AD8361. Further information is available [www.analogedevices.com/]. Details of the design requirements and the detector/monitor's circuit as well as the performance of the detector will be presented

  17. Cooling system upgrading from 250 kW to 1 MW

    International Nuclear Information System (INIS)

    Anderson, T.V.; Johnson, A.G.; Ringle, J.C.

    1972-01-01

    The Oregon State TRIGA reactor (OSTR) power capability was upgraded from 250 KW to 1 MW in 1969; however, funds were not available for simultaneous upgrading of the cooling system. Since then, the OSTR has been selectively operating at full power with the original 250 KW cooling system. After funds were made available in 1971 the construction on the new heat exchanger building began. The new cooling system was installed, equipment was checked out, corrections were made, and acceptance tests were run. In addition, several days were required to clean up the primary system water, since increased water flow (350 gpm) swirled 4 year's collection of sediment off the reactor tank bottom and into the primary system. Three interesting items have been noticed, which are apparently a result of the cooling system upgrading: (1) the radiation levels above the reactor tank have been reduced by a factor of 2 to 3, (2) a low resonance vibration in the reactor core occurs at 1 MW. The vibration is attributed to a combination of increased water turbulence and subcooled (surface) nucleate boiling, and (3) direct radiation levels from the demineralizer tank have increased approximately 8-fold. This resulted in a relocation of the tank and the use of supplemental shielding. Increased operating time at higher average power levels, plus disturbance of; sediment on the bottom of the reactor tank are believed to be the main sources of the higher radiation levels

  18. Beam test results for the upgraded LHCb RICH opto-electronic readout system

    CERN Multimedia

    Carniti, Paolo

    2016-01-01

    The LHCb experiment is devoted to high-precision measurements of CP violation and search for New Physics by studying the decays of beauty and charmed hadrons produced at the Large Hadron Collider (LHC). Two RICH detectors are currently installed and operating successfully, providing a crucial role in the particle identification system of the LHCb experiment. Starting from 2019, the LHCb experiment will be upgraded to operate at higher luminosity, extending its potential for discovery and study of new phenomena. Both the RICH detectors will be upgraded and the entire opto-electronic system has been redesigned in order to cope with the new specifications, namely higher readout rates, and increased occupancies. The new photodetectors, readout electronics, mechanical assembly and cooling system have reached the final phase of development and their performance was thoroughly and successfully validated during several beam test sessions in 2014 and 2015 at the SPS facility at CERN. Details of the test setup and perf...

  19. SARIE upgrade: Nuclear reactor and water systems 'engineering and training' simulator

    International Nuclear Information System (INIS)

    Roth, P.

    2006-01-01

    Confronted as of its origins with the on-board layout constraints of the French Navy ships, TECHNICATOME integrates, as of the design, the ergonomics and the risks control related to the human factors. During more than 30 years, TECHNICATOME demonstrated a one of a kind know-how from the design to the execution of powerful, flexible and highly available nuclear compact reactors. A total control which includes up to the supervision and monitoring systems, the acoustic discreetly of the systems and its components, implemented on on-board reactors, testing reactors as well as experimental reactors. The functionalities of simulation were right from the start used by TECHNICATOME during the design phase of these installations to carry out operation engineering analyses on the thermal hydraulic and neutron aspects, to validate the principles of operation of the supervision systems like by the use of digital models in 3D CAD to validate the kinematics of operation or the interactions between systems. More recently, and starting from the end of the Nineties, a thought needs was launched to determine the interests related to the development of a training simulator associated with these installations with objectives, among others, to ensure the phase of initial training of the new operators, to widen the field of the training to the accidental situations, the management of crisis and crews behaviour supervision, the possibilities of replay which support the consolidation of the acquired knowledge(debriefing) with situation resume, and to increase the overall training capacity. An upgrade and modernisation project of these various simulation means was thus launched since 2001 with the objective to optimize the whole of the tasks supported by these means. (author)

  20. Upgrade of the CMS muon trigger system in the barrel region

    CERN Document Server

    Rabady, Dinyar; Carlin, Roberto; Codispoti, Giuseppe; Dallavalle, Marco; Erö, Janos; Flouris, Giannis; Foudas, Costas; Fulcher, Jonathan; Guiducci, Luigi; Loukas, Nikitas; Mallios, Stavros; Manthos, Nikos; Papadopoulos, Ioannis; Paradas, Evangelos; Reis, Thomas; Sakulin, Hannes; Sphicas, Paris; Triossi, Andrea; Venturi, Andrea; Wulz, Claudia-Elisabeth

    2016-01-01

    To maintain the excellent performance of the LHC during its Run-1 also in Run-2, the Level-1 Trigger of the Compact Muon Solenoid experiment underwent a significant upgrade. One part of this upgrade was the re-organisation of the muon trigger path from a subsystem-centric view in which hits in the drift tubes, the cathode strip chambers, and the resistive plate chambers were treated separately in dedicated track-finding systems, to one in which complementary detector systems for a given region (barrel, overlap, and endcap) are merged already at the track-finding level. This also required the development of a new system to sort as well as cancel-out the muon tracks found by each system. An overview will be given of the new track-finder system for the barrel region, the Barrel Muon Track Finder (BMTF) as well as the cancel-out and sorting layer, the upgraded Global Muon Trigger (µGMT). While the BMTF improves on the proven and well-tested algorithms used in the Drift Tube Track Finder during Run-1, the µGMT i...

  1. Upgrade of the CMS muon trigger system in the barrel region

    CERN Document Server

    Battilana, Carlo; Codispoti, Giuseppe; Dallavalle, Gaetano-Marco; Ero, Janos; Flouris, Giannis; Fountas, Konstantinos; Fulcher, Jonathan Richard; Guiducci, Luigi; Loukas, Nikitas; Mallios, Stavros; Manthos, Nikolaos; Papadopoulos, Ioannis; Paradas, Evangelos; Rabady, Dinyar Sebastian; Reis, Thomas; Sakulin, Hannes; Sphicas, Paraskevas; Triossi, Andrea; Venturi, Andrea; Wulz, Claudia

    2016-01-01

    To maintain the excellent performance of the LHC during its Run-1 also in Run-2, the Level-1 Trigger of the Compact Muon Solenoid experiment underwent a significant upgrade. One part of this upgrade was the re-organisation of the muon trigger path from a subsystem-centric view in which hits in the drift tubes, the cathode strip chambers, and the resistive plate chambers were treated separately in dedicated track-finding systems, to one in which complementary detector systems for a given region (barrel, overlap, and endcap) are merged already at the track-finding level. This also required the development of a new system to sort as well as cancel-out the muon tracks found by each system. An overview will be given of the new track-finder system for the barrel region, the Barrel Muon Track Finder (BMTF) as well as the cancel-out and sorting layer, the upgraded Global Muon Trigger ($\\mu$GMT). While the BMTF improves on the proven and well-tested algorithms used in the Drift Tube Track Finder during Run-1, the $\\m...

  2. Upgrade of the CMS muon trigger system in the barrel region

    CERN Document Server

    Rabady, Dinyar; Carlin, Roberto; Codispoti, Giuseppe; Dallavalle, Marco; Erö, Janos; Flouris, Giannis; Foudas, Costas; Fulcher, Jonathan; Guiducci, Luigi; Loukas, Nikitas; Mallios, Stavros; Manthos, Nikos; Papadopoulos, Ioannis; Paradas, Evangelos; Reis, Thomas; Sakulin, Hannes; Sphicas, Paris; Triossi, Andrea; Venturi, Andrea; Wulz, Claudia-Elisabeth

    2017-01-01

    To maintain the excellent performance of the LHC during its Run-1 also in Run-2, the Level-1 Trigger of the Compact Muon Solenoid experiment underwent a significant upgrade. One part of this upgrade was the re-organisation of the muon trigger path from a subsystem-centric view in which hits in the drift tubes, the cathode strip chambers, and the resistive plate chambers were treated separately in dedicated track-finding systems, to one in which complementary detector systems for a given region (barrel, overlap, and endcap) are merged already at the track-finding level. This also required the development of a new system to sort as well as cancel-out the muon tracks found by each system. An overview will be given of the new track-finder system for the barrel region, the Barrel Muon Track Finder (BMTF) as well as the cancel-out and sorting layer, the upgraded Global Muon Trigger (µGMT). While the BMTF improves on the proven and well-tested algorithms used in the Drift Tube Track Finder during Run-1, the µGMT i...

  3. Upgrade of the CMS muon trigger system in the barrel region

    CERN Document Server

    AUTHOR|(CDS)2080489; Flouris, Gianis; Fulcher, Jonathan; Loukas, Nikitas; Paradas, Evangelos; Reis,Thomas; Sakulin, Hannes; Wulz, Claudia-Elisabeth

    2016-01-01

    To maintain the excellent performance shown during the LHCs Run-1 the Level-1 Trigger of the Compact Muon Solenoid experiment underwent a significant upgrade. One part of this upgrade is the re-organization of the muon trigger path from a subsystem-centric view in which hits in the drift tubes (DT), the cathode strip chambers (CSC), and the resistive plate chambers (RPC) were treated separately in dedicated track-finding systems to one in which complementary detector systems for a given region (barrel, overlap, and endcap) are merged at the track-finding level. This fundamental restructuring of the muon trigger system required the development of a system to receive track candidates from the track-finding layer, remove potential duplicate tracks, and forward the best candidates to the global decision layer.An overview will be given of the new track-finder system for the barrel region, the Barrel Muon Track Finder (BMTF) as well as the cancel-out and sorting layer, the upgraded Global Muon Trigger ($\\mu$GMT). B...

  4. Upgrade of DC power supply system in ITER CS model coil test facility

    International Nuclear Information System (INIS)

    Shimono, Mitsugu; Uno, Yasuhiro; Yamazaki, Keita; Kawano, Katsumi; Isono, Takaaki

    2014-03-01

    Objective of the ITER CS Model Coil Test Facility is to evaluate a large scale superconducting conductor for fusion using the Central Solenoid (CS) Model Coil, which can generate a 13T magnetic field in the inner bore with a 1.5 m diameter. The facility is composed of a helium refrigerator / liquefier system, a DC power supply system, a vacuum system and a data acquisition system. The DC power supply system supplies currents to two superconducting coils, the CS Model Coil and an insert coil. A 50-kA DC power supply is installed for the CS Model Coil and two 30 kA DC power supplies are installed for an insert coil. In order to evaluate superconducting performance of a conductor used for ITER Toroidal Field (TF) coils whose operating current is 68 kA, the line for an insert coil is upgraded. A 10 kA DC power supply was added, DC circuit breakers were upgraded, bus bars and current measuring instrument were replaced. In accordance to the upgrade, operation manual was revised. (author)

  5. Experience with the upgraded VERONA-u WWER-440 core monitoring system

    International Nuclear Information System (INIS)

    Lux, I.; Vegh, J.; Adorjan, F.; Buerger, L.

    1994-01-01

    The paper describes the components, functioning and services of the VERONA-u core monitoring system recently installed at Unit 2 and 3 of the Hungarian Paks NPP. The VERONA-u is a totally upgraded and modernized version of the previous VERONA system, in the upgrading project the data-concentrator, the host computer and the operators' displays were replaced by state-of-the-art hardware and software components. Dual hardware redundancy and automatic function recovery actions were introduced in order to ensure high system availability. The man-machine interface has been redesigned completely, applying X Windows as Graphical User Interface. Improved core analysis and power reconstruction methods were introduced, together with a detailed hot-spot monitoring algorithm. A capable archivation module ensures periodic logging of all measured data, change sensitive storage of important signal changes and provides sophisticated post-mortem analysis tools. The upgraded system has been working satisfactorily on Unit 2 for a complete fuel cycle by now, the on-line system response in complex, transient situations is illustrated in the paper. (author). 10 refs, 4 figs

  6. Upgraded divertor Thomson scattering system on DIII-D

    Energy Technology Data Exchange (ETDEWEB)

    Glass, F., E-mail: glassf@fusion.gat.com; Carlstrom, T. N.; Du, D.; Taussig, D. A.; Boivin, R. L. [General Atomics, P.O. Box 85608, San Diego, California 92186-5608 (United States); McLean, A. G. [Lawrence Livermore National Laboratory, P.O. Box 808, Livermore, California 94550 (United States)

    2016-11-15

    A design to extend the unique divertor Thomson scattering system on DIII-D to allow measurements of electron temperature and density in high triangularity plasmas is presented. Access to this region is selectable on a shot-by-shot basis by redirecting the laser beam of the existing divertor Thomson system inboard — beneath the lower floor using a moveable, high-damage threshold, in-vacuum mirror — and then redirecting again vertically. The currently measured divertor region remains available with this mirror retracted. Scattered light is collected from viewchords near the divertor floor using in-vacuum, high temperature optical elements and relayed through the port window, before being coupled into optical fiber bundles. At higher elevations from the floor, measurements are made by dynamically re-focusing the existing divertor system collection optics. Nd:YAG laser timing, analysis of the scattered light spectrum via polychromators, data acquisition, and calibration are all handled by existing systems or methods of the current multi-pulse Thomson scattering system. Existing filtered polychromators with 7 spectral channels are employed to provide maximum measurement breadth (T{sub e} in the range of 0.5 eV–2 keV, n{sub e} in the range of 5 × 10{sup 18}–1 × 10{sup 21} m{sup 3}) for both low T{sub e} in detachment and high T{sub e} measurement up beyond the separatrix.

  7. A Virtual Upgrade Validation Method for Software-Reliant Systems

    Science.gov (United States)

    2012-06-01

    behalf of the Army Program Executive Office Aviation (PEO- AVN ). The work consists of the development of the VUV method, the subject of this report...Introduction This report is the first in a series of three reports developed by the SEI for the ASSIP and sponsored by the Army PEO AVN . This first report...Technology OQA operational quality attribute OSATE Open Source AADL Tool Environment PCI Peripheral Control Interface PEO AVN Program Executive

  8. Technical Development of Gamma Scanning for Irradiated Fuel Rod after Upgrade of System in Hot-cell

    Energy Technology Data Exchange (ETDEWEB)

    Ryu, Woo Seog; Kim, Hee Moon; Baik, Seung Je; Yoo, Byung Ok; Choo, Yong Sun

    2007-06-15

    Non-destructive test system was installed at hot-cell(M1) in IMEF(Irradiated Materials Examination Facility) more than 10 years ago for the diametric measurement and gamma scanning of fuel rod. But this system must be needed to be remodeled for the effective operations. In 2006, the system was upgraded for 3 months. The collimator bench can be movable with horizontal direction(x-direction) by motorized system for sectional gamma scanning and 3-dimensional tomography of fuel rod. So, gamma scanning for fuel rod can be detectable by x, y and rotation directions. It may be possible to obtain the radioactivities with radial and axial directions of pellet. This system is good for the series experiments with several positions. Operation of fuel bench and gamma detection program were linked each other by new program tools. It can control detection and bench moving automatically when gamma inspection of fuel rod is carried out with axial or radial positions. Some of electronic parts were added in PLC panel, and operating panel was re-designed for the remote control. To operate the fuel bench by computer, AD converter and some I/O cards were installed in computer. All of software were developed in Windows-XP system instead of DOS system. Control programs were made by visual-C language. After upgrade of system, DUPIC fuel which was irradiated in HANARO research reactor was detected by gamma scanning. The results were good and operation of gamma scanning showed reduced inspection time and easy control of data on series of detection with axial positions. With consideration of ECT(Eddy Current Test) installation, the computer program and hardware were set up as well. But ECT is not installed yet, so we have to check abnormal situation of program and hardware system. It is planned to install ECT in 2007.

  9. Spent fuel pool cooling system upgrade for Kori Unit 1

    International Nuclear Information System (INIS)

    Sun Park, Jong; In Shin, Kyung

    2014-01-01

    Following Fukushima nuclear power plant accident, the needs for reliable performance of its own safety functions of Spent Fuel Pool Cooling System (SFPCS) has risen significantly to maintain the plant in a safe condition. Regulatory Guide 1.13 of United States Nuclear Regulatory Commission (USNRC) requires the SFPCS shall be designed safety related as Quality Group C and Seismic Category 1. However, the existing Spent Fuel Pool (SFP) of KORI Unit 1 was not designed as a safety system. In order to comply with the above licensing requirement for the extended operational life of KORI Unit 1, it has been decided to add a safety related Seismic Category 1 Makeup System to KORI Unit 1 and the existing SFPCS to be modified in dedicated channels with safety related equipment to enhance system's reliability as a means of providing diversity. This paper focuses on describing the relevant design requirements, applications, and supplemental facilities to the SFPCS of KORI Unit 1. (authors)

  10. High heat flux engineering for the upgraded neutral beam injection systems of MAST-U

    International Nuclear Information System (INIS)

    Dhalla, F.; Mistry, S.; Turner, I.; Barrett, T.R.; Day, I.; McAdams, R.

    2015-01-01

    Highlights: • A new Residual Ion Dump (RID) and bend magnet system for the upgraded NBI systems have been designed for the 5 s MAST-U pulse requirements. • Design scoping was performed using numerical ion-tracing analysis software (MAGNET and OPERA codes). • A more powerful bending magnet will separate the residual ions into full, half and third energy components. • Three separate CuCrZr dumps spread the power loading resulting in acceptable power footprints. • FE thermo-mechanical analyses using ANSYS to validate the designs against the ITER SDC-IC code. • New bend magnet coils, yoke and CuCrZr water-cooled plates are in the procurement phase. - Abstract: For the initial phase of MAST-U operation the two existing neutral beam injection systems will be used, but must be substantially upgraded to fulfil expected operational requirements. The major elements are the design, manufacture and installation of a bespoke bending magnet and Residual Ion Dump (RID) system. The MAST-design full energy dump is being replaced with new actively-cooled full, half and third energy dumps, designed to receive 2.4 MW of ion power deflected by an iron-cored electromagnet. The main design challenge is limited space available in the vacuum vessel, requiring ion-deflection calculations to ensure acceptable heat flux distribution on the dump panels. This paper presents engineering and physics analysis of the upgraded MAST beamlines and reports the current status of manufacture.

  11. Performance of the Prototype Readout System for the CMS Endcap Hadron Calorimeter Upgrade

    Science.gov (United States)

    Chaverin, Nate; Dittmann, Jay; Hatakeyama, Kenichi; Pastika, Nathaniel; CMS Collaboration

    2016-03-01

    The Compact Muon Solenoid (CMS) experiment at the CERN Large Hadron Collider (LHC) will upgrade the photodetectors and readout systems of the endcap hadron calorimeter during the technical stop scheduled for late 2016 and early 2017. A major milestone for this project was a highly successful testbeam run at CERN in August 2015. The testbeam run served as a full integration test of the electronics, allowing a study of the response of the preproduction electronics to the true detector light profile, as well as a test of the light yield of various new plastic scintillator materials. We present implications for the performance of the hadron calorimeter front-end electronics based on testbeam data, and we report on the production status of various components of the system in preparation for the upgrade.

  12. The upgraded ring loss radiation monitorinng system at the AGS

    International Nuclear Information System (INIS)

    Bennett, G.W.; Beadle, E.; Castille, V.; Witkover, R.L.

    1989-01-01

    With the Booster the AGS will accelerate protons to 3 /times/ 10 13 per cycle, polarized protons at 10 12 , and ions from Carbon to Gold at intensities from 50 to 3 /times/ 10 9 . A loss monitoring system is being developed to facilitate tuning, and to reduce personnel radiation exposure by minimizing residual induced activity and by allowing remote monitoring of activity in the accelerator enclosure. The monitoring system must have a large dynamic range to monitor high intensity beam losses and to measure induced activity down to the level of a few mrad/hour. Various detectors are being evaluated, including ion chambers, proportional counters, and aluminium cathode electronmultipliers. Measurements of the prompt ionization distribution in the median plane at various energies from point targets at two representative locations in the accelerator lattice have been completed. Details of the monitoring system will be presented, as well as the experimental measurements of the prompt radiation field, and a comparable Monte Carlo calculation. 2 refs., 5 figs

  13. MULTIPLE ECH LAUNCHER CONTROL SYSTEM

    International Nuclear Information System (INIS)

    GREEN, M.T.; PONCE, D.; GRUNLOH, H.J.; ELLIS, R.A.; GROSNICKLE, W.H.; HUMPHREY, R.L.

    2004-03-01

    OAK-B135 The addition of new, high power gyrotrons to the heating and current drive arsenal at DIII-D, required a system upgrade for control of fully steerable ECH Launchers. Each launcher contains two pointing mirrors with two degrees of mechanical freedom. The two flavors of motion are called facet and tilt. Therefore up to four channels of motion per launcher need to be controlled. The system utilizes absolute encoders to indicate mirror position and therefore direction of the microwave beam. The launcher movement is primarily controlled by PLC, but future iterations of design, may require this control to be accomplished by a CPU on fast bus such as Compact PCI. This will be necessary to accomplish real time position control. Safety of equipment and personnel is of primary importance when controlling a system of moving parts. Therefore multiple interlocks and fault status enunciators have been implemented. This paper addresses the design of a Multiple ECH Launcher Control System, and characterizes the flexibility needed to upgrade to a real time position control system in the future

  14. Upgrade of the CMS muon trigger system in the barrel region

    International Nuclear Information System (INIS)

    Rabady, Dinyar; Ero, Janos; Flouris, Giannis; Fulcher, Jonathan; Loukas, Nikitas; Paradas, Evangelos; Reis, Thomas; Sakulin, Hannes; Wulz, Claudia-Elisabeth

    2017-01-01

    To maintain the excellent performance shown during the LHC's Run-1 the Level-1 Trigger of the Compact Muon Solenoid experiment underwent a significant upgrade. One part of this upgrade is the re-organization of the muon trigger path from a subsystem-centric view in which hits in the drift tubes (DT), the cathode strip chambers (CSC), and the resistive plate chambers (RPC) were treated separately in dedicated track-finding systems to one in which complementary detector systems for a given region (barrel, overlap, and endcap) are merged at the track-finding level. This fundamental restructuring of the muon trigger system required the development of a system to receive track candidates from the track-finding layer, remove potential duplicate tracks, and forward the best candidates to the global decision layer. An overview will be given of the new track-finder system for the barrel region, the Barrel Muon Track Finder (BMTF), as well as the cancel-out and sorting layer: the upgraded Global Muon Trigger (μGMT). Both the BMTF and μGMT have been implemented in a Xilinx Virtex-7 card utilizing the microTCA architecture. While the BMTF improves on the proven and well-tested algorithms used in the Drift Tube Track Finder during Run-1, the μGMT is an almost complete re-development due to the re-organization of the underlying systems from track-finders for a specific detector to regional track finders covering a given area of the whole detector. Additionally the μGMT calculates a muon's isolation using energy information received from the calorimeter trigger. This information is added to the muon objects forwarded to the global decision layer, the so-called Global Trigger. - Highlights: • Presented upgraded Global Muon Trigger and Barrel Muon Track Finder systems. • Upgraded system moves from sub-detector centric view to geometric-view. • To improve trigger performance. • Common hardware improves maintainability and increases development speed. • Use of

  15. Upgrade of the CMS muon trigger system in the barrel region

    Energy Technology Data Exchange (ETDEWEB)

    Rabady, Dinyar, E-mail: dinyar.rabady@cern.ch [Institute of High Energy Physics Vienna (HEPHY), Nikolsdorfer Gasse 18, 1050 Wien (Austria); Ero, Janos [Institute of High Energy Physics Vienna (HEPHY), Nikolsdorfer Gasse 18, 1050 Wien (Austria); Flouris, Giannis [University of Ioannina, 45110 Ioannina (Greece); Fulcher, Jonathan [CERN, 1211 Geneve 23 (Switzerland); Loukas, Nikitas; Paradas, Evangelos [University of Ioannina, 45110 Ioannina (Greece); Reis, Thomas; Sakulin, Hannes; Wulz, Claudia-Elisabeth [CERN, 1211 Geneve 23 (Switzerland)

    2017-02-11

    To maintain the excellent performance shown during the LHC's Run-1 the Level-1 Trigger of the Compact Muon Solenoid experiment underwent a significant upgrade. One part of this upgrade is the re-organization of the muon trigger path from a subsystem-centric view in which hits in the drift tubes (DT), the cathode strip chambers (CSC), and the resistive plate chambers (RPC) were treated separately in dedicated track-finding systems to one in which complementary detector systems for a given region (barrel, overlap, and endcap) are merged at the track-finding level. This fundamental restructuring of the muon trigger system required the development of a system to receive track candidates from the track-finding layer, remove potential duplicate tracks, and forward the best candidates to the global decision layer. An overview will be given of the new track-finder system for the barrel region, the Barrel Muon Track Finder (BMTF), as well as the cancel-out and sorting layer: the upgraded Global Muon Trigger (μGMT). Both the BMTF and μGMT have been implemented in a Xilinx Virtex-7 card utilizing the microTCA architecture. While the BMTF improves on the proven and well-tested algorithms used in the Drift Tube Track Finder during Run-1, the μGMT is an almost complete re-development due to the re-organization of the underlying systems from track-finders for a specific detector to regional track finders covering a given area of the whole detector. Additionally the μGMT calculates a muon's isolation using energy information received from the calorimeter trigger. This information is added to the muon objects forwarded to the global decision layer, the so-called Global Trigger. - Highlights: • Presented upgraded Global Muon Trigger and Barrel Muon Track Finder systems. • Upgraded system moves from sub-detector centric view to geometric-view. • To improve trigger performance. • Common hardware improves maintainability and increases development speed. • Use of

  16. Design and Validation of Control Room Upgrades Using a Research Simulator Facility

    Energy Technology Data Exchange (ETDEWEB)

    Ronald L. Boring; Vivek Agarwal; Jeffrey C. Joe; Julius J. Persensky

    2012-11-01

    Since 1981, the United States (U.S.) Nuclear Regulatory Commission (NRC) [1] requires a plant- specific simulator facility for use in training at U.S. nuclear power plants (NPPs). These training simulators are in near constant use for training and qualification of licensed NPP operators. In the early 1980s, the Halden Man-Machine Laboratory (HAMMLab) at the Halden Reactor Project (HRP) in Norway first built perhaps the most well known set of research simulators. The HRP offered a high- fidelity simulator facility in which the simulator is functionally linked to a specific plant but in which the human-machine interface (HMI) may differ from that found in the plant. As such, HAMMLab incorporated more advanced digital instrumentation and controls (I&C) than the plant, thereby giving it considerable interface flexibility that researchers took full advantage of when designing and validating different ways to upgrade NPP control rooms. Several U.S. partners—the U.S. NRC, the Electrical Power Research Institute (EPRI), Sandia National Laboratories, and Idaho National Laboratory (INL) – as well as international members of the HRP, have been working with HRP to run control room simulator studies. These studies, which use crews from Scandinavian plants, are used to determine crew behavior in a variety of normal and off-normal plant operations. The findings have ultimately been used to guide safety considerations at plants and to inform advanced HMI design—both for the regulator and in industry. Given the desire to use U.S. crews of licensed operators on a simulator of a U.S. NPP, there is a clear need for a research simulator facility in the U.S. There is no general-purpose reconfigurable research oriented control room simulator facility in the U.S. that can be used for a variety of studies, including the design and validation of control room upgrades.

  17. A once in a generation upgrade to ICT systems used for public transport in Victoria; Umfassende Modernisierung. Neue ICT-Systeme fuer den SPNV in Victoria

    Energy Technology Data Exchange (ETDEWEB)

    Hammerton, Richard [Funkwerk Information Technologies York Ltd., York (United Kingdom)

    2010-07-01

    Funkwerk IT is supplying a state-of-the-art timetable and fleet planning and management system to the Australian State of Victoria. Through its agency, the Department of Transport, Victoria is undertaking a once in a generation upgrade to key ICT systems that are used for operational control of the metropolitan and regional rail networks. The new system requires a tight coupling of both planning and real-time management systems. Using its products TrainPlan, ResourcePlan and ResourceManager Funkwerk IT provides an ideal platform to cover these requirements. (orig.)

  18. The trend of the research and development for the upgrade of the high current energy system

    International Nuclear Information System (INIS)

    2010-01-01

    The high current energy technology ranges from a basic technology of the electric power field to a state-of-the-art technology and has been used extremely variously. In addition, as the energy technology advances, the expansion of applied field, such as the nuclear fusion and the exhaust thing processing, etc., requires a further upgrade of the large current technology. In this report, the trend of the research and development for the upgrade of the high current energy technology are summarized. In the following, the elemental technology including arc/plasma phenomena and the pulse power system is described in Chapter 2. In Chapter 3, the trend of the research and development for the upgrade of various equipments and devices such as the nuclear fusion development, the superconducting applications of SMES and the maglev transportation system, and the arc application of the exhaust processing for a medical waste, the radio active waste and a detrimental gas and the next generation lithography system. In Chapter 4, the analysis and the measurement technology of the arc phenomenon and the standardization of current shunt, etc are described. We hope this research report can contribute to the promotion of technical exchanges in different fields, and offer guidelines for future development in this high current energy technology. (author)

  19. Upgrade of the early warning system in Slovenia

    International Nuclear Information System (INIS)

    Sarvari, A.; Cindro, M.; Krizman, M.; Mitic, D.

    2003-01-01

    The main task of the Early Warning System in Slovenia is to warn the competent authorities of the increase of external radiation. Only an efficient Ewes can cope with the situation that we have in case of nuclear or radiation accident. For such purposes the measuring locations have to fulfil some basic radiation monitoring criteria (population density, distance from NPP, precipitation, land use). In this article the results of each criterion as well as the total set is described. The results of the applied criteria are presented with colour contour images. The purpose of this article is to allocate the critical areas on the territory of Slovenia that have to be considered in final determination of the appropriate measuring locations. (author)

  20. The 'SF' System of Sextupoles for the JLAB 10 KW Free Electron Laser Upgrade

    International Nuclear Information System (INIS)

    Biallas, George; Augustine, Mark; Baggett, Kenneth; Douglas, David; Wines, Robin

    2009-01-01

    The characteristics of the system of 'SF' Sextupoles for the infrared Free Electron Laser Upgrade1 at the Thomas Jefferson National Accelerator Facility (JLab) are described. These eleven sextupoles possess a large field integral (2.15 T/m) with +/- 0.2% field quality over a 120 mm width within a very short effective length (150 mm pole length) and have field clamps for fast field roll-off. The field integrals reproduce extremely well with good absolute resolution (+/- 0.1%). The simple, two-dimensional shape pole tips (directly from the original 3-D RADIA magnetic model) of these 'all ends' magnets include the correction for end fields. Magnetic measurements are compared to the model. The system's hysteresis protocol and power supplies were also used for the measurement process to enhance reproducibility in service, a recent initiative at JLab. The intricacies of magnetic measurement using the JLab field probe based Stepper Stand are described. The details of the system's low quality power supplies brought to 50-200 PPM current regulation using in-house designed feedback and of control by CAN-Bus are described. Magnetic modeling was instrumental in showing us how to make these 'all ends' magnets. The two-dimensional pole-tip incorporating three-dimensional correction made manufacturing easier. The Power Supply Systems utilizing 'off the shelf' supplies with in-house built correction are viable. The hall probe measurements were noisy at about the level the specifications but did give us the confidence to place the magnets into service.

  1. Commentary: Diversity 3.0: a necessary systems upgrade.

    Science.gov (United States)

    Nivet, Marc A

    2011-12-01

    This is a defining moment for health and health care in the United States, and medical schools and teaching hospitals have a critical role to play. The combined forces of health care reform, demographic shifts, continued economic woes, and the projected worsening of physician shortages portend major challenges for the health care enterprise in the near future. In this commentary, the author employs a diversity framework implemented by IBM and argues that this framework should be adapted to an academic medicine setting to meet the challenges to the health care enterprise. Using IBM's diversity framework, the author explores three distinct phases in the evolution of diversity thinking within the academic medicine community. The first phase included isolated efforts aimed at removing social and legal barriers to access and equality, with institutional excellence and diversity as competing ends. The second phase kept diversity on the periphery but raised awareness about how increasing diversity benefits everyone, allowing excellence and diversity to exist as parallel ends. In the third phase, which is emerging today and reflects a growing understanding of diversity's broader relevance to institutions and systems, diversity and inclusion are integrated into the core workings of the institution and framed as integral for achieving excellence. The Association of American Medical Colleges, a leading voice and advocate for increased student and faculty diversity, is set to play a more active role in building the capacity of the nation's medical schools and teaching hospitals to move diversity from a periphery to a core strategy.

  2. The ATLAS Trigger system upgrade and performance in Run 2

    CERN Document Server

    Shaw, Savanna Marie; The ATLAS collaboration

    2017-01-01

    The ATLAS trigger has been used very successfully for the online event selection during the first part of the LHC Run-2 in 2015/16 at a centre-of-mass energy of 13 TeV. The trigger system is composed of a hardware Level-1 trigger and a software-based high-level trigger; it reduces the event rate from the bunch-crossing rate of 40 MHz to an average recording rate of about 1 kHz. The excellent performance of the ATLAS trigger has been vital for the ATLAS physics program of Run-2, selecting interesting collision events for wide variety of physics signatures with high efficiency. The trigger selection capabilities of ATLAS during Run-2 have been significantly improved compared to Run-1, in order to cope with the higher event rates and pile-up which are the result of the almost doubling of the center-of-mass collision energy and the increase in the instantaneous luminosity of the LHC. In order to prepare for the anticipated further luminosity increase of the LHC in 2017/18, improving the trigger performance remain...

  3. The ATLAS Trigger system upgrade and performance in Run 2

    CERN Document Server

    Shaw, Savanna Marie; The ATLAS collaboration

    2018-01-01

    The ATLAS trigger has been used very successfully for the online event selection during the first part of the second LHC run (Run-2) in 2015/16 at a centre-of-mass energy of 13 TeV. The trigger system is composed of a hardware Level-1 trigger and a software-based high-level trigger; it reduces the event rate from the bunch-crossing rate of 40 MHz to an average recording rate of about 1 kHz. The excellent performance of the ATLAS trigger has been vital for the ATLAS physics program of Run-2, selecting interesting collision events for wide variety of physics signatures with high efficiency. The trigger selection capabilities of ATLAS during Run-2 have been significantly improved compared to Run-1, in order to cope with the higher event rates and pile-up which are the result of the almost doubling of the center-of-mass collision energy and the increase in the instantaneous luminosity of the LHC. At the Level-1 trigger the undertaken improvements resulted in more pile-up robust selection efficiencies and event ra...

  4. Ion cyclotron radio frequency systems and performance on the tandem mirror experiment-upgrade (TMX-U)

    International Nuclear Information System (INIS)

    Moore, T.L.; Molvik, A.W.; Cummins, W.F.; Pedrotti, L.R.; Henderson, A.L.; Karsner, P.G.; Scofield, D.W.; Brooksby, C.A.

    1983-01-01

    High power ion cyclotron radio frequency (ICRF) systems are now gaining greater attention than before as prime driver ion heating systems. Lawrence Livermore National Laboratory (LLNL) has installed a 200 kW high frequency (HF) transmitter system on its Tandem Mirror Experiment-Upgrade (TMX-U). This paper describes the system, antenna, controls, and monitoring apparatus. The transmitter operates into a high Q antenna installed in the central cell region of the experiment. It incorporates a dual-port feedback system to automatically adjust the transmitter's output power and allow the maximum consistent with the plasma loading of the antenna. Special techniques have been used to measure, in real-time, the dynamically changing loading values presented by the plasma. From the measurements, the antenna impedance can be optimized for specified plasma density

  5. Real-time control of the plasma density profile on ASDEX upgrade

    International Nuclear Information System (INIS)

    Mlynek, Alexander

    2010-01-01

    The tokamak concept currently is the most promising approach to future power generation by controlled thermonuclear fusion. The spatial distribution of the particle density in the toroidally confined fusion plasma is of particular importance. This thesis work therefore focuses on the question as to what extent the shape of the density profile can be actively controlled by a feedback loop in the fusion experiment ASDEX Upgrade. There are basically two essential requirements for such feedback control of the density profile, which has been experimentally demonstrated within the scope of this thesis work: On the one hand, for this purpose the density profile must be continuously calculated under real-time constraints during a plasma discharge. The calculation of the density profile is based on the measurements of a sub-millimeter interferometer, which provides the line-integrated electron density along 5 chords through the plasma. Interferometric density measurements can suffer from counting errors by integer multiples of 2π when detecting the phase difference between a probing and a reference beam. As such measurement errors have severe impact on the reconstructed density profile, one major part of this work consists in the development of new readout electronics for the interferometer, which allows for detection of such measurement errors in real-time with high reliability. A further part of this work is the design of a computer algorithm which reconstructs the spatial distribution of the plasma density from the line-integrated measurements. This algorithm has to be implemented on a computer which communicates the measured data to other computers in real-time, especially to the tokamak control system. On the other hand, a second fundamental requirement for the successful implementation of a feedback controller is the identification of at least one actuator which enables a modification of the density profile. Here, electron cyclotron resonance heating (ECRH) has been

  6. Performance Test of the Next Generation X-Ray Beam Position Monitor System for The APS Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Yang, B.; Lee, S.; Westferro, F.; Jaski, Y.; Lenkszus, F.; Sereno, N.; Ramanathan, M.

    2017-03-25

    The Advanced Photon Source is developing its next major upgrade (APS-U) based on the multi-bend achromat lattice. Improved beam stability is critical for the upgrade and will require keeping short-time beam angle change below 0.25 µrad and long-term angle drift below 0.6 µrad. A reliable white x-ray beam diagnostic system in the front end will be a key part of the planned beam stabilization system. This system includes an x-ray beam position monitor (XBPM) based on x-ray fluorescence (XRF) from two specially designed GlidCop A-15 absorbers, a second XBPM using XRF photons from the Exit Mask, and two white beam intensity monitors using XRF from the photon shutter and Compton-scattered photons from the front end beryllium window or a retractable diamond film in windowless front ends. We present orbit stability data for the first XBPM used in the feedback control during user operations, as well as test data from the second XBPM and the intensity monitors. They demonstrate that the XBPM system meets APS-U beam stability requirements.

  7. RF upgrade program in LHC injectors and LHC machine

    International Nuclear Information System (INIS)

    Jensen, E.

    2012-01-01

    The main themes of the RF upgrade program are: the Linac4 project, the LLRF-upgrade and the study of a tuning-free wide-band system for PSB, the upgrade of the SPS 800 MHz amplifiers and beam controls and the upgrade of the transverse dampers of the LHC. Whilst LHC Splice Consolidation is certainly the top priority for LS1, some necessary RF consolidation and upgrade is necessary to assure the LHC performance for the next 3- year run period. This includes: 1) necessary maintenance and consolidation work that could not fit the shorter technical stops during the last years, 2) the upgrade of the SPS 200 MHz system from presently 4 to 6 cavities and possibly 3) the replacement of one LHC cavity module. On the longer term, the LHC luminosity upgrade requires crab cavities, for which some preparatory work in SPS Coldex must be scheduled during LS1. (author)

  8. Development and upgrade of new real time processor in JT-60 data processing system

    International Nuclear Information System (INIS)

    Sakata, Shinya; Koiwa, Motonao; Matsuda, Toshiaki; Aoyagi, Tetsuo

    2000-07-01

    At the beginning of JT-60 experiments, the real time processor (RTP) in the data processing system was mainly constructed by PANAFACOM U-1500. As the computer became superannuated, however, it gradually became difficult to maintain both hardware and software. A performance of a recent UNIX workstation has been remarkably progressed. The UNIX workstation has a large flexibility for user application programs, an easiness for maintenance of the hardware and an ability of expansion to peripheral devices. Therefore, the RTP system is newly reconstructed by using the UNIX workstation. This report describes the overview, the basic design and the recent upgrade on the RTP in the data processing system. (author)

  9. Cost evaluation of I and C upgrade approach in nuclear power plants

    International Nuclear Information System (INIS)

    Kang, Hyun-Tae; Lee, Jae-Ki

    2013-01-01

    Highlights: • Cost evaluation process for I and C system upgrade is built. • 4 cost factors affecting I and C system upgrade are described. • Additional cost incurred by a phased upgrade is calculated. • Cost for system upgrade between upgrade implementations is compared. - Abstract: Utilities have recently been debating the respective pros and cons of implementation of a multi-phase upgrade during several normal outages versus a single major upgrade implementation during a prolonged outage. We have studied these approaches and have been developing the basic design of nuclear power plants (NPPs) instrumentation and control (I and C) upgrade since early 2008. As part of this study, analyses of the NPPs I and C systems were conducted and the need for upgrading the systems was raised. One of the primary concerns regarding the system upgrade is a cost-benefit implementation, which will influence the upgrade approach. From this viewpoint, the I and C upgrade must consider economic factors such as I and C vendor cost, architecture engineering cost, installation cost, utility cost, and other transition costs such as training and procedure development. This paper presents a comparison study of economical aspects including cost evaluation between the aforementioned upgrade implementations and suggests a solution for I and C upgrade approach

  10. Towards a resilience management framework for complex enterprise systems upgrade implementation

    Science.gov (United States)

    Teoh, Say Yen; Yeoh, William; Zadeh, Hossein Seif

    2017-05-01

    The lack of knowledge of how resilience management supports enterprise system (ES) projects accounts for the failure of firms to leverage their investments in costly ES implementations. Using a structured-pragmatic-situational (SPS) case study research approach, this paper reports on an investigation into the resilience management of a large utility company as it implemented an ES upgrade. Drawing on the literature and on the case study findings, we developed a process-based resilience management framework that involves three strategies (developing situation awareness, demystifying threats, and executing restoration plans) and four organisational capabilities that transform resilience management concepts into practices. We identified the crucial phases of ES upgrade implementation and developed indicators for how different strategies and capabilities of resilience management can assist managers at different stages of an ES upgrade. This research advances the state of existing knowledge by providing specific and verifiable propositions for attaining a state of resilience, the knowledge being grounded in the empirical reality of a case study. Moreover, the framework offers ES practitioners a roadmap to better identify appropriate responses and levels of preparedness.

  11. Development of CMOS pixel sensors for the upgrade of the ALICE Inner Tracking System

    International Nuclear Information System (INIS)

    Molnar, L.

    2014-01-01

    The ALICE Collaboration is preparing a major upgrade of the current detector, planned for installation during the second long LHC shutdown in the years 2018-19, in order to enhance its low-momentum vertexing and tracking capability, and exploit the planned increase of the LHC luminosity with Pb beams. One of the cornerstones of the ALICE upgrade strategy is to replace the current Inner Tracking System in its entirety with a new, high resolution, low-material ITS detector. The new ITS will consist of seven concentric layers equipped with Monolithic Active Pixel Sensors (MAPS) implemented using the 0.18 μm CMOS technology of TowerJazz. In this contribution, the main key features of the ITS upgrade will be illustrated with emphasis on the functionality of the pixel chip. The ongoing developments on the readout architectures, which have been implemented in several fabricated prototypes, will be discussed. The operational features of these prototypes as well as the results of the characterisation tests before and after irradiation will also be presented

  12. Development of CMOS pixel sensors for the upgrade of the ALICE Inner Tracking System

    Science.gov (United States)

    Molnar, L.

    2014-12-01

    The ALICE Collaboration is preparing a major upgrade of the current detector, planned for installation during the second long LHC shutdown in the years 2018-19, in order to enhance its low-momentum vertexing and tracking capability, and exploit the planned increase of the LHC luminosity with Pb beams. One of the cornerstones of the ALICE upgrade strategy is to replace the current Inner Tracking System in its entirety with a new, high resolution, low-material ITS detector. The new ITS will consist of seven concentric layers equipped with Monolithic Active Pixel Sensors (MAPS) implemented using the 0.18 μm CMOS technology of TowerJazz. In this contribution, the main key features of the ITS upgrade will be illustrated with emphasis on the functionality of the pixel chip. The ongoing developments on the readout architectures, which have been implemented in several fabricated prototypes, will be discussed. The operational features of these prototypes as well as the results of the characterisation tests before and after irradiation will also be presented.

  13. Status of the BEPC control system

    International Nuclear Information System (INIS)

    Zhao Jijiu; Yan Yonghe; Zhan Mingchuan; Yu Yulan; Luo Huiying; Wang Yaru; Geng Xiaosong

    1994-01-01

    The control system of the Beijing Electron Positron Collider (BEPC) was built by the end of 1987. Since then, it has been running safely and reliably. Due to the tight construction schedule, we adopted the control system structure of the new SPEAR of SLAC, which was a centralized control system. The system was not performing very well due to various problems such as low CPU power, limited memory of the VAX-11/750 control computer, a bottle-neck of the VAX-CAMAC-Channel etc. Since 1991 we have therefore been working on upgrading it to a distributed control system based on DECnet. The old console will be replaced by VAX-4090 workstations. The status of the system and the progress of the upgrading work are presented in this paper. ((orig.))

  14. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  15. Multiprocessor systems for real-time data acquisition on the Asdex upgrade and future plasma experiments

    International Nuclear Information System (INIS)

    Zilker, M.; Hallatschek, K.; Heimann, P.; Hertweck, F.

    1999-01-01

    In this paper we present our transputer-based multitop multiprocessor systems for data acquisition, which are currently used on the Asdex upgrade experiment. The bandwidth of these systems goes from low-speed like the calorimetry diagnostic up to highspeed and large data volume systems like the soft-X-ray and Mirnov diagnostics, which collect several hundreds of megabytes of data during a plasma discharge of ∼8 s. Further, we present the multitop-MX, a newly developed system based on transputers and powerPCs, which provides real-time facilities for analysing the acquired data, to generate necessary information for the dynamic adaptation of sample rates, and to deliver triggers when certain events in the plasma are detected. The algorithm running on the powerPCs performs a wavelet like time-frequency transform. In the last part we give an outlook how to build the next generation of data acquisition systems to be used on the future plasma experiments W7-X and ITER, but also on Asdex upgrade. The hardware of these new distributed systems should be mainly based on established industry standards like the VME-bus, PCI-bus and FiberChannel, but also emerging technologies like SCI (scalable coherent interconnect) should be considered. The systems software should be well designed with object oriented methods to simplify the maintenance process and to enable further expansions and adaptations to new problems in an easy way. (orig.)

  16. Circular waveguide systems for electron-cyclotron-resonant heating of the tandem mirror experiment-upgrade

    International Nuclear Information System (INIS)

    Felker, B.; Calderon, M.O.; Chargin, A.K.

    1983-01-01

    Extensive use of electron cyclotron resonant heating (ECRH) in the Tandem Mirror Experiment-Upgrade (TMX-U) requires continuous development of components to improve efficiency, increase reliability, and deliver power to new locations with respect to the plasma. We have used rectangular waveguide components on the experiment and have developed, tested, and installed circular waveguide components. We replaced the rectangular with the circular components because of the greater transmission efficiency and power-handling capability of the circular ones. Design, fabrication, and testing of all components are complete for all systems. In this paper we describe the design criteria for the system

  17. Tandem-Mirror Experiment-Upgrade neutral pressure measurement diagnostic systems

    International Nuclear Information System (INIS)

    Pickles, W.L.; Allen, S.L.; Hill, D.N.; Hunt, A.L.; Simonen, T.C.

    1985-01-01

    The Tandem-Mirror Experiment-Upgrade (TMX-U) has a large and complex system of Bayard--Alpert, magnetron, and Penning gauges, in addition to mass spectrometers (RGA), all of which measure neutral pressures in the many internal regions of TMX-U. These pressure measurements are used as part of the confinement physics data base as well as for management of the TMX-U vacuum system. Dynamic pressures are modeled by a coupled-volumes simulation code, which includes wall reflux, getter pumping, and plasma pumping

  18. Design of bunch compressing system with suppression of coherent synchrotron radiation for ATF upgrade

    International Nuclear Information System (INIS)

    Jing, Yichao; Fedurin, Mikhail; Stratakis, Diktys

    2015-01-01

    One of the operation modes for Accelerator Test Facility (ATF) upgrade is to provide high peak current, high quality electron beam for users. Such operation requires a bunch compressing system with a very large compression ratio. The CSR originating from the strong compressors generally could greatly degrade the quality of the electron beam. In this paper, we present our design for the entire bunch compressing system that will limit the effect of CSR on the e-beam@s quality. We discuss and detail the performance from the start to end simulation of such a compressor for ATF.

  19. Upgrade of reactor operation technology

    International Nuclear Information System (INIS)

    Itoh, Hideaki; Suzuki, Toshiaki; O-kawa, Toshikatsu

    2003-01-01

    To improve operational reliability and availability, the operation technology for a fast reactor was developed in the ''JOYO''. This report describes the upgrading of the simulator, plant operation management tools and fuel handling system for the MK-III core operation. The simulator was modified to the MK-III version to verify operation manuals, and to train operators in MK-III operation. The plant operation management tool was replaced on the operation experience to increase the reliability and efficiency of plant management works relating to plant operation and maintenance. To shorten the refueling period, the fuel handling system was upgraded to full automatic remote control. (author)

  20. Reconstruction of instrumentation and control system (SKR)

    International Nuclear Information System (INIS)

    Wiening, K.-H.

    2001-01-01

    For the first time extensive upgrades have been performed in all safety related areas of units with WWER 440/230 reactors. One of the most important actions was the replacement of the safety and safety related instrumentation and control. The state of the art digital safety instrumentation and control system TELEPERM XS has been implemented in units 1 and 2 of the Bohunice V1 power plant. The requirements as deduced from safety assessments conducted by commissions of international experts have been fulfilled, so that Bohunice V1 after this gradual reconstruction has been upgraded to an internationally accepted safety level for the remainder of its service life. (author)