  1. Nuclear power generation costs in the United States of America

    International Nuclear Information System (INIS)

    Willis, W.F.

    1983-01-01

    Increasing world energy prices and shortages of fuel resources make the utilization of nuclear power extremely important. The United States nuclear power industry represents the largest body of nuclear power experience in the world. Analysis of the recent United States experience of substantial increases in the cost of nuclear power generation provides good insight into the interdependence of technological, financial, and institutional influences and their combined impact on the economic viability of nuclear power generation. The various factors influencing ultimate generation costs, including construction cost, fuel cost, regulatory reviews, and siting considerations are discussed, and their relative impacts are explored, including discussion of design complexity and related regulatory response. A closer look into the recent relatively high escalation of nuclear plant construction costs shows how differing economic conditions can affect the relative cost effectiveness of various methods of power generation. The vulnerability of capital-intensive, long-lead-time projects to changes in economic conditions and uncertainty in future power demands is discussed. Likewise, the pitfalls of new designs and increased sophistication are contrasted to the advantages which result from proven designs, reliable engineering, and shorter lead times. The value of reliable architect-engineers experienced in the design and construction of the plant is discussed. A discussion is presented of additional regulatory requirements stemming from public safety aspects of nuclear power. These include recognition of requirements for the very large effort for quality assurance of materials and workmanship during plant construction and operation. Likewise, a discussion is included of the demanding nature of operations, maintenance, and modification of plants during the operational phase because of the need for highly qualified operations and maintenance personnel and strict quality assurance

  2. Commerical electric power cost studies. Capital cost addendum multi-unit coal and nuclear stations

    International Nuclear Information System (INIS)

    1977-09-01

    This report is the culmination of a study performed to develop designs and associated capital cost estimates for multi-unit nuclear and coal commercial electric power stations, and to determine the distribution of these costs among the individual units. This report addresses six different types of 2400 MWe (nominal) multi-unit stations as follows: Two Unit PWR Station-1139 MWe Each, Two Unit BWR Station-1190 MWe Each, Two Unit High Sulfur Coal-Fired Station-1232 MWe Each, Two Unit Low Sulfur Coal-Fired Station-1243 MWe Each, Three Unit High Sulfur Coal-Fired Station-794 MWe Each, Three Unit Low Sulfur Coal-Fired Station-801 MWe Each. Recent capital cost studies performed for ERDA/NRC of single unit nuclear and coal stations are used as the basis for developing the designs and costs of the multi-unit stations. This report includes the major study groundrules, a summary of single and multi-unit stations total base cost estimates, details of cost estimates at the three digit account level and plot plan drawings for each multi-unit station identified

  3. Sizing Combined Heat and Power Units and Domestic Building Energy Cost Optimisation

    OpenAIRE

    Dongmin Yu; Yuanzhu Meng; Gangui Yan; Gang Mu; Dezhi Li; Simon Le Blond

    2017-01-01

    Many combined heat and power (CHP) units have been installed in domestic buildings to increase energy efficiency and reduce energy costs. However, inappropriate sizing of a CHP may actually increase energy costs and reduce energy efficiency. Moreover, the high manufacturing cost of batteries makes batteries less affordable. Therefore, this paper will attempt to size the capacity of CHP and optimise daily energy costs for a domestic building with only CHP installed. In this paper, electricity ...

  4. Thermoeconomic cost analysis of CO_2 compression and purification unit in oxy-combustion power plants

    International Nuclear Information System (INIS)

    Jin, Bo; Zhao, Haibo; Zheng, Chuguang

    2015-01-01

    Highlights: • Thermoeconomic cost analysis for CO_2 compression and purification unit is conducted. • Exergy cost and thermoeconomic cost occur in flash separation and mixing processes. • Unit exergy costs for flash separator and multi-stream heat exchanger are identical. • Multi-stage CO_2 compressor contributes to the minimum unit exergy cost. • Thermoeconomic performance for optimized CPU is enhanced. - Abstract: High CO_2 purity products can be obtained from oxy-combustion power plants through CO_2 compression and purification unit (CPU) based on phase separation method. To identify cost formation process and potential energy savings for CPU, detailed thermoeconomic cost analysis based on structure theory of thermoeconomics is applied to an optimized CPU (with double flash separators). It is found that the largest unit exergy cost occurs in the first separation process while the multi-stage CO_2 compressor contributes to the minimum unit exergy cost. In two flash separation processes, unit exergy costs for the flash separator and multi-stream heat exchanger are identical but their unit thermoeconomic costs are different once monetary cost for each device is considered. For cost inefficiency occurring in CPU, it mainly derives from large exergy costs and thermoeconomic costs in the flash separation and mixing processes. When compared with an unoptimized CPU, thermoeconomic performance for the optimized CPU is enhanced and the maximum reduction of 5.18% for thermoeconomic cost is attained. To achieve cost effective operation, measures should be taken to improve operations of the flash separation and mixing processes.

  5. A preliminary design and BOP cost analysis of M-C Power`s MCFC commerical unit

    Energy Technology Data Exchange (ETDEWEB)

    Chen, T.P. [Bechtel Corp, San Francisco, CA (United States)

    1996-12-31

    M-C Power Corporation plans to introduce its molten carbonate fuel cell (MCFC) market entry unit in the year 2000 for distributed and on-site power generation. Extensive efforts have been made to analyze the cell stack manufacturing costs. The major objective of this study is to conduct a detailed analysis of BOP costs based on an initial design of the market entry unit.

  6. Sizing Combined Heat and Power Units and Domestic Building Energy Cost Optimisation

    Directory of Open Access Journals (Sweden)

    Dongmin Yu

    2017-06-01

    Full Text Available Many combined heat and power (CHP units have been installed in domestic buildings to increase energy efficiency and reduce energy costs. However, inappropriate sizing of a CHP may actually increase energy costs and reduce energy efficiency. Moreover, the high manufacturing cost of batteries makes batteries less affordable. Therefore, this paper will attempt to size the capacity of CHP and optimise daily energy costs for a domestic building with only CHP installed. In this paper, electricity and heat loads are firstly used as sizing criteria in finding the best capacities of different types of CHP with the help of the maximum rectangle (MR method. Subsequently, the genetic algorithm (GA will be used to optimise the daily energy costs of the different cases. Then, heat and electricity loads are jointly considered for sizing different types of CHP and for optimising the daily energy costs through the GA method. The optimisation results show that the GA sizing method gives a higher average daily energy cost saving, which is 13% reduction compared to a building without installing CHP. However, to achieve this, there will be about 3% energy efficiency reduction and 7% input power to rated power ratio reduction compared to using the MR method and heat demand in sizing CHP.

  7. Investigations of the unit generation costs of the nuclear power plants

    International Nuclear Information System (INIS)

    Guntay, S.

    1977-01-01

    An extensive study has been carried out to investigate the unit generation costs of different reactor types. The study analyzes the following: i) development of capital costs, ii) Fuel cycle costs, iii) operation and maintenance costs, iv) local and foreign finance requirements for an arbitrary reactor type

  8. Nuclear power generating costs

    International Nuclear Information System (INIS)

    Srinivasan, M.R.; Kati, S.L.; Raman, R.; Nanjundeswaran, K.; Nadkarny, G.V.; Verma, R.S.; Mahadeva Rao, K.V.

    1983-01-01

    Indian experience pertaining to investment and generation costs of nuclear power stations is reviewed. The causes of investment cost increases are analysed and the increases are apportioned to escalation, design improvements and safety related adders. The paper brings out the fact that PHWR investment costs in India compare favourably with those experienced in developed countries in spite of the fact that the programme and the unit size are relatively much smaller in India. It brings out that in India at current prices a nuclear power station located over 800 km from coal reserves and operating at 75% capacity factor is competitive with thermal power at 60% capacity factor. (author)

  9. Statistical Power and Optimum Sample Allocation Ratio for Treatment and Control Having Unequal Costs Per Unit of Randomization

    Science.gov (United States)

    Liu, Xiaofeng

    2003-01-01

    This article considers optimal sample allocation between the treatment and control condition in multilevel designs when the costs per sampling unit vary due to treatment assignment. Optimal unequal allocation may reduce the cost from that of a balanced design without sacrificing any power. The optimum sample allocation ratio depends only on the…

  10. Unit Cost Compendium Calculations

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Unit Cost Compendium (UCC) Calculations raw data set was designed to provide for greater accuracy and consistency in the use of unit costs across the USEPA...

  11. Power plant removal costs

    International Nuclear Information System (INIS)

    Ferguson, J.S.

    1998-01-01

    The financial, regulatory and political significance of the estimated high removal costs of nuclear power plants has generated considerable interest in recent years, and the political significance has resulted in the Nuclear Regulatory Commission (NRC) eliminating the use of conventional depreciation accounting for the decontamination portion of the removal (decommissioning). While nuclear plant licensees are not precluded from utilizing conventional depreciation accounting for the demolition of non-radioactive structures and site restoration, state and federal utility regulators have not been favorably inclined to requests for this distinction. The realization that steam-generating units will be more expensive to remove, relative to their original cost, predates the realization that nuclear units will be expensive. However, the nuclear issues have overshadowed this realization, but are unlikely to continue to do so. Numerous utilities have prepared cost estimates for steam generating units, and this presentation discusses the implications of a number of such estimates that are a matter of public record. The estimates cover nearly 400 gas, oil, coal and lignite generating units. The earliest estimate was made in 1978, and for analysis purposes the author has segregated them between gas and oil units, and coal and lignite units

  12. Internalizing social costs in power plant siting: some examples for coal and nuclear plants in the United States

    International Nuclear Information System (INIS)

    Peelle, E.

    1976-01-01

    Selected aspects of the United States experience in one particular type of energy development project, the siting of nuclear and fossil fueled power generating facilities, are examined in terms of how well community-level impacts are internalized. New institutional arrangements being devised and new requirements being made at local, state, regional, and federal levels in response to these dissociations of cost and benefits from large energy development projects are discussed. Selected examples of these new institutional responses are analyzed for adequacy and significance

  13. Cost of nuclear power generation judged by power rate

    International Nuclear Information System (INIS)

    Hirai, Takaharu

    1981-01-01

    According to estimation guidance, power rates in general are the proper cost plus the specific compensation and adjustment addition. However, the current system of power rates is of power-source development promotion type involving its tax. The structure of power rate determination must be restudied now especially in connection of nuclear power generation. The cost of nuclear power generation as viewed from power rate is discussed as follows: the fear of military application of power plants, rising plant construction costs, the loophole in fuel cost calculation, unreasonable unit power cost, depreciation and repair cost, business compensation, undue business compensation in nuclear power, the costs of nuclear waste management, doubt concerning nuclear power cost, personnel, pumping-up and power transmission costs in nuclear power, energy balance analysis, nuclear power viewed in entropy, the suppression of power consumption. (J.P.N.)

  14. Decommissioning Unit Cost Data

    International Nuclear Information System (INIS)

    Sanford, P. C.; Stevens, J. L.; Brandt, R.

    2002-01-01

    The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for

  15. Social cost of CO2 abatement from energy efficiency and solar power in the United States

    International Nuclear Information System (INIS)

    Hall, D.C.

    1992-01-01

    Frequently cited empirical analysis ask whether we should make the transition from reliance on fossil fuels to reduce greenhouse gas emissions, and conclude that the transition is too costly so we should, instead, focus policy on how to adapt to global warming. This paper makes two improvements in the analysis. First, this empirical analysis accounts for existing low-cost alternatives that are substitutes for fossil fuels. Second, this empirical analysis incorporates existing estimates of externalities from fossil fuels. These two basic improvements in the analysis alter the conclusion; policy should focus on how rapidly and extensively to make the transition from reliance on fossil fuels to the alternatives. The corollary is that we should focus on the efficacy and cost of policy options that are designed to accomplish the transition. 4 tabs., 1 app., 45 refs

  16. United States experience in environmental cost-benefit analysis for nuclear power plants with implications for developing countries

    International Nuclear Information System (INIS)

    Spangler, M.B.

    1980-08-01

    Environmental cost-benefit analysis in the United States involves a comparison of diverse societal impacts of the proposed developments and its alternatives. Regarding nuclear power plant licensing actions, such analyses include the need for base-load electrical generating capacity versus the no-action alternative; alternative sources of energy; alternative sites for the proposed nuclear plants; and alternative technologies for mitigating environmental impacts. Many U.S. experiences and environmental assessment practices and comparative resource requirements presented in this report will not provide a wholly reliable reflection of the precise situation of each country. Nevertheless, the procedural and substantive issues encountered by the United States in nuclear power plant licensing may exhibit a number of important, if rough, parallelisms for other countries. Procedural issues dealt with include: the scoping of alternatives and impact issues; the problem of balancing incommensurable impacts; and treating uncertainty in measuring or forecasting certain kinds of environmental impacts. Although substantive environmental impact issues will vary appreciably among nations, it is to be expected that many of the substantive impact issues such as impacts on biota, community-related effects, and aesthetic impacts will also have some measure of universal interest to other countries

  17. Nuclear power costs

    International Nuclear Information System (INIS)

    1963-01-01

    A report prepared by the IAEA Secretariat and presented to the seventh session of the Agency's General Conference says that information on nuclear power costs is now rapidly moving from the domain of uncertain estimates to that of tested factual data. As more and more nuclear power stations are being built and put into operation, more information on the actual costs incurred is becoming available. This is the fourth report on nuclear power costs to be submitted to the IAEA General Conference. The report last year gave cost information on 38 nuclear power projects, 17 of which have already gone into operation. Certain significant changes in the data given last year are included-in the present report; besides, information is given on seven new plants. The report is divided into two parts, the first on recent developments and current trends in nuclear power costs and the second on the use of the cost data for economic comparisons. Both stress the fact that the margin of uncertainty in the basic data has lately been drastically reduced. At the same time, it is pointed out, some degree of uncertainty is inherent in the assumptions made in arriving at over-all generating cost figures, especially when - as is usually the case - a nuclear plant is part of an integrated power system

  18. Public power costs less

    International Nuclear Information System (INIS)

    Moody, D.

    1993-01-01

    The reasons why residential customers of public power utilities paid less for power than private sector customers is discussed. Residential customers of investor-owned utilities (IOU's) paid average rates that were 28% above those paid by customers by possibly owned systems during 1990. The reasons for this disparity are that management costs faced by public power systems are below those of private power companies, indicating a greater efficiency of management among public power systems, and customer accounts expenses averaged $33.00 per customer for publicly owned electric utilities compared to $39.00 per customer for private utilities

  19. Insurance for replacement power costs

    International Nuclear Information System (INIS)

    Cleaver, A.

    1980-01-01

    Although careful consideration is given to insurance against physical damage to plant and equipment, little thought is given to the costs that will be incurred in replacing the power that is lost while a relatively efficient system is out of action. The results of an investigation carried out for a generating authority with an installed capacity of about 3000 MW is given. Replacement power costs for different cases of severity of damage range from Pound1.17m per month for damage to central services taking out all four units. (author)

  20. Low cost balancing unit design

    Science.gov (United States)

    Golembiovsky, Matej; Dedek, Jan; Slanina, Zdenek

    2017-06-01

    This article deals with the design of a low-cost balancing system which consist of battery balancing units, accumulator pack units and coordinator unit with interface for higher level of battery management system. This solution allows decentralized mode of operation and the aim of this work is implementation of controlling and diagnostic mechanism into an electric scooter project realized at Technical university of Ostrava. In todays world which now fully enjoys the prime of electromobility, off-grid battery systems and other, it is important to seek the optimal balance between functionality and the economy side of BMS that being electronics which deals with secondary cells of batery packs. There were numerous sophisticated, but not too practical BMS models in the past, such as centralized system or standalone balance modules of individual cells. This article aims at development of standalone balance modules which are able to communicate with the coordinator, adjust their parameters and ensure their cells safety in case of a communication failure. With the current worldwide cutting cost trend in mind, the emphasis was put on the lowest price possible for individual component. The article is divided into two major categories, the first one being desing of power electronics with emphasis on quality, safety (cooling) and also cost. The second part describes development of a communication interface with reliability and cost in mind. The article contains numerous graphs from practical measurements. The outcome of the work and its possible future is defined in the conclusion.

  1. Nuclear power production costs

    International Nuclear Information System (INIS)

    Erramuspe, H.J.

    1988-01-01

    The economic competitiveness of nuclear power in different highly developed countries is shown, by reviewing various international studies made on the subject. Generation costs (historical values) of Atucha I and Embalse Nuclear Power Plants, which are of the type used in those countries, are also included. The results of an international study on the economic aspects of the back end of the nuclear fuel cycle are also reviewed. This study shows its relatively low incidence in the generation costs. The conclusion is that if in Argentina the same principles of economic racionality were followed, nuclear energy would be economically competitive in the future, as it is today. This is of great importance in view of its almost unavoidable character of alternative source of energy, and specially since we have to expect an important growth in the consumption of electricity, due to its low share in the total consumption of energy, and the low energy consumption per capita in Argentina. (Author) [es

  2. Joint U.S./Russian Study on the Development of a Preliminary Cost Estimate of the SAFSTOR Decommissioning Alternative for the Leningrad Nuclear Power Plant Unit #1

    Energy Technology Data Exchange (ETDEWEB)

    SM Garrett

    1998-09-28

    The objectives of the two joint Russian/U.S. Leningrad Nuclear Power Plant (NPP) Unit #1 studies were the development of a safe, technically feasible, economically acceptable decom missioning strategy, and the preliminary cost evaluation of the developed strategy. The first study, resulting in the decommissioning strategy, was performed in 1996 and 1997. The preliminary cost estimation study, described in this report, was performed in 1997 and 1998. The decommissioning strategy study included the analyses of three basic RBM.K decommission- ing alternatives, refined for the Leningrad NPP Unit #1. The analyses included analysis of the requirements for the planning and preparation as well as the decommissioning phases.

  3. Stabilization of gas turbine unit power

    Science.gov (United States)

    Dolotovskii, I.; Larin, E.

    2017-11-01

    We propose a new cycle air preparation unit which helps increasing energy power of gas turbine units (GTU) operating as a part of combined cycle gas turbine (CCGT) units of thermal power stations and energy and water supply systems of industrial enterprises as well as reducing power loss of gas turbine engines of process blowers resulting from variable ambient air temperatures. Installation of GTU power stabilizer at CCGT unit with electric and thermal power of 192 and 163 MW, respectively, has resulted in reduction of produced electrical energy production costs by 2.4% and thermal energy production costs by 1.6% while capital expenditures after installation of this equipment increased insignificantly.

  4. Flywheel and power unit

    Energy Technology Data Exchange (ETDEWEB)

    Seeley, R.W.

    1992-10-28

    A power unit, e.g. for an electrically driven vehicle, incorporates a flywheel for storing kinetic energy and a battery for storing electrical energy. The battery is incorporated as a substantial part of the rotating mass of the flywheel. Preferably the unit further includes an electrical machine being a motor or generator or machine operable either as a motor or a generator for transferring energy between the battery and the flywheel and/or for the input or output of rotary energy therefrom or thereto. The motor may be used for powering the flywheel and may also operate in a regenerative mode for recharging the unit on de-acceleration of the vehicle. The unit of the invention may also be utilized as an electrical stored power source, e.g. wind or water driven. (author)

  5. The costs of nuclear power

    International Nuclear Information System (INIS)

    Vestenhaug, O.; Sauar, T.O.; Nielsen, P.O.

    1979-01-01

    A study has been made by Scandpower A/S of the costs of nuclear power in Sweden. It is based on the known costs of existing Swedish nuclear power plants and forecasts of the expected costs of the Swedish nuclear power programme. special emphasis has been put on the fuel cycle costs and future costs of spent fuel processing, waste disposal and decommissioning. Costs are calculated in 1978 Swedish crowns, using the retail price index. An actual interest rate of 4% is used, with depreciation period of 25 years and a plant lifetime of 30 years. Power production costs are estimated to be about 7.7 oere/kWh in 1978, rising to 10.5 oere/kWh in 2000. The cost is distributed with one third each to capital costs, operating costs and fuel costs, the last rising to 40% of the total at the end of the century. The main single factor in future costs is the price of uranium. If desired, Sweden can probably be self-sufficient in uranium in 2000 at a lower cost than assumed here. National research costs which, in Scandpower's opinion, can be debited to the commercial nuclear power programme are about 0.3 oere/kWh. (JIW)

  6. Nuclear power generation cost methodology

    International Nuclear Information System (INIS)

    Delene, J.G.; Bowers, H.I.

    1980-08-01

    A simplified calculational procedure for the estimation of nuclear power generation cost is outlined. The report contains a discussion of the various components of power generation cost and basic equations for calculating that cost. An example calculation is given. The basis of the fixed-charge rate, the derivation of the levelized fuel cycle cost equation, and the heavy water charge rate are included as appendixes

  7. LPGC, Levelized Steam Electric Power Generator Cost

    International Nuclear Information System (INIS)

    Coen, J.J.; Delene, J.G.

    1994-01-01

    1 - Description of program or function: LPGC is a set of nine microcomputer programs for estimating power generation costs for large steam-electric power plants. These programs permit rapid evaluation using various sets of economic and technical ground rules. The levelized power generation costs calculated may be used to compare the relative economics of nuclear and coal-fired plants based on life-cycle costs. Cost calculations include capital investment cost, operation and maintenance cost, fuel cycle cost, decommissioning cost, and total levelized power generation cost. These programs can be used for quick analyses of power generation costs using alternative economic parameters, such as interest rate, escalation rate, inflation rate, plant lead times, capacity factor, fuel prices, etc. The two major types of electric generating plants considered are pressurized-water reactor (PWR) and pulverized coal-fired plants. Data are also provided for the Large Scale Prototype Breeder (LSPB) type liquid metal reactor. Costs for plant having either one or two units may be obtained. 2 - Method of solution: LPGC consists of nine individual menu-driven programs controlled by a driver program, MAINPWR. The individual programs are PLANTCAP, for calculating capital investment costs; NUCLOM, for determining operation and maintenance (O and M) costs for nuclear plants; COALOM, for computing O and M costs for coal-fired plants; NFUEL, for calculating levelized fuel costs for nuclear plants; COALCOST, for determining levelized fuel costs for coal-fired plants; FCRATE, for computing the fixed charge rate on the capital investment; LEVEL, for calculating levelized power generation costs; CAPITAL, for determining capitalized cost from overnight cost; and MASSGEN, for generating, deleting, or changing fuel cycle mass balance data for use with NFUEL. LPGC has three modes of operation. In the first, each individual code can be executed independently to determine one aspect of the total

  8. Power generation costs. Coal - nuclear power

    International Nuclear Information System (INIS)

    1979-01-01

    This supplement volume contains 17 separate chapters investigating the parameters which determine power generation costs on the basis of coal and nuclear power and a comparison of these. A detailed calculation model is given. The complex nature of this type of cost comparison is shown by a review of selected parameter constellation for coal-fired and nuclear power plants. The most favourable method of power generation can only be determined if all parameters are viewed together. One quite important parameter is the load factor, or rather the hours of operation. (UA) 891 UA/UA 892 AMO [de

  9. Mobile power plant units

    Energy Technology Data Exchange (ETDEWEB)

    Radtke, R

    1979-10-05

    Diesel engines of the MaK line 282 AK/332 with a cylinder power up to 160 kW are used, either as 6-cylinder or 8-cylinder in-line engine or as 12-cylinder V engine. Fuel consumption is between 207 and 212 g/kW. The engine is mounted on a frame, together with a generator. The fuel reserve in the tank will last for 8 hours. The lubricating system, the cooling water and starting air system, the switchboard system, and the frame are described. The switchboard plant is mounted either on a skid undercarriage or on the undercarriage. The plant can be operated independently or parallel to the network. The unit can be remote-controlled via push buttons or control knobs. A picture is presented of a mobile diesel aggregate which is in service in Libya.

  10. Optimal inspection and replacement periods of the safety system in Wolsung Nuclear Power Plant Unit 1 with an optimized cost perspective

    International Nuclear Information System (INIS)

    Jinil Mok; Poong Hyun Seong

    1996-01-01

    In this work, a model for determining the optimal inspection and replacement periods of the safety system in Wolsung Nuclear Power Plant Unit 1 is developed, which is to minimize economic loss caused by inadvertent trip and the system failure. This model uses cost benefit analysis method and the part for optimal inspection period considers the human error. The model is based on three factors as follows: (i) The cumulative failure distribution function of the safety system, (ii) The probability that the safety system does not operate due to failure of the system or human error when the safety system is needed at an emergency condition and (iii) The average probability that the reactor is tripped due to the failure of system components or human error. The model then is applied to evaluate the safety system in Wolsung Nuclear Power Plant Unit 1. The optimal replacement periods which are calculated with proposed model differ from those used in Wolsung NPP Unit 1 by about a few days or months, whereas the optimal inspection periods are in about the same range. (author)

  11. An evaluation of cost estimates of nuclear power reactor decommissioning in Sweden, Germany and the United States

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, S O; Varley, G; Heibel, R; Rusch, C [NAC International, Zurich (Switzerland)

    1995-11-01

    Nominal base decommissioning cost estimates in Sweden, Germany and the US differ by large amounts. Even after adjustments to normalize the work scopes, significant cost differences remain. Variations in national cost structures, achievable productivity, the extent of preexisting infrastructure and institutional factors all contribute to make up the differences. Exchange rate aberrations are a complication for which appropriate adjustments have to be made in order to achieve a meaningful comparison. Our analyses demonstrate that virtually all these differences between the Swedish, German and US estimates can be explained by these factors. In terms of the overall reasonableness of the Swedish estimate as a basis for making financial provisions, there remain some issues that may warrant further investigation. One is the potential for and financial consequences of a serious interruption to the proposed sea transportation system. Secondly, the limited number of individual system analyses we have performed indicated some significant potential underestimates. For example, dismantling of the reactor pressure vessel costs appear to be underestimated by up to 70 MSEK (about 10 MUSD) per reactor, or up to 900 MSEK for the whole Swedish program of 12 reactors. Overall, the Swedish estimates appear to be built up in a logical and reasonable way. Our analyses indicate that some internal inconsistencies exist and that some specific input data assumptions may not be valid. In summary, the credibility of the estimates would benefit from further refinement of the scenarios and assumptions. 21 refs., 15 figs., 42 tabs.

  12. An evaluation of cost estimates of nuclear power reactor decommissioning in Sweden, Germany and the United States

    International Nuclear Information System (INIS)

    Andersson, S.O.; Varley, G.; Heibel, R.; Rusch, C.

    1995-11-01

    Nominal base decommissioning cost estimates in Sweden, Germany and the US differ by large amounts. Even after adjustments to normalize the work scopes, significant cost differences remain. Variations in national cost structures, achievable productivity, the extent of preexisting infrastructure and institutional factors all contribute to make up the differences. Exchange rate aberrations are a complication for which appropriate adjustments have to be made in order to achieve a meaningful comparison. Our analyses demonstrate that virtually all these differences between the Swedish, German and US estimates can be explained by these factors. In terms of the overall reasonableness of the Swedish estimate as a basis for making financial provisions, there remain some issues that may warrant further investigation. One is the potential for and financial consequences of a serious interruption to the proposed sea transportation system. Secondly, the limited number of individual system analyses we have performed indicated some significant potential underestimates. For example, dismantling of the reactor pressure vessel costs appear to be underestimated by up to 70 MSEK (about 10 MUSD) per reactor, or up to 900 MSEK for the whole Swedish program of 12 reactors. Overall, the Swedish estimates appear to be built up in a logical and reasonable way. Our analyses indicate that some internal inconsistencies exist and that some specific input data assumptions may not be valid. In summary, the credibility of the estimates would benefit from further refinement of the scenarios and assumptions. 21 refs., 15 figs., 42 tabs

  13. Costs of Decommissioning Nuclear Power Plants

    International Nuclear Information System (INIS)

    Neri, Emilio; French, Amanda; Urso, Maria Elena; Deffrennes, Marc; Rothwell, Geoffrey; ); Rehak, Ivan; Weber, Inge; ); Carroll, Simon; Daniska, Vladislav

    2016-01-01

    While refurbishments for the long-term operation of nuclear power plants and for the lifetime extension of such plants have been widely pursued in recent years, the number of plants to be decommissioned is nonetheless expected to increase in future, particularly in the United States and Europe. It is thus important to understand the costs of decommissioning so as to develop coherent and cost-effective strategies, realistic cost estimates based on decommissioning plans from the outset of operations and mechanisms to ensure that future decommissioning expenses can be adequately covered. This study presents the results of an NEA review of the costs of decommissioning nuclear power plants and of overall funding practices adopted across NEA member countries. The study is based on the results of this NEA questionnaire, on actual decommissioning costs or estimates, and on plans for the establishment and management of decommissioning funds. Case studies are included to provide insight into decommissioning practices in a number of countries. (authors)

  14. Nuclear power in the United States

    International Nuclear Information System (INIS)

    Johnston, J.B.

    1985-01-01

    All over the world except in the United States, nuclear energy is a low cost, secure, environmentally acceptable form of energy. In the United States, civilian nuclear power is dead. 112 nuclear power plants have been abandoned or cancelled in the last decade, and there has been no new order for nuclear plants since 1978. It will be fortunate to have 125 operating nuclear plants in the United States in the year 2000. There are almost 90 completed nuclear power plants and about 45 under construction in the United States, but several of those under construction will eventually be abandoned. About 20 % of the electricity in the United States will be generated by nuclear plants in 2000 as compared with 13 % supplied in the last year. Under the present regulatory and institutional arrangement, American electric utilities would not consider to order a new nuclear power plant. Post-TMI nuclear plants became very expensive, and there is also ideological opposition to nuclear power. Coal-firing plants are also in the similar situation. The uncertainty about electric power demand, the cost of money, the inflation of construction cost and regulation caused the situation. (Kako, I.)

  15. Power conditioning unit for photovoltaic power systems

    Science.gov (United States)

    Beghin, G.; Nguyen Phuoc, V. T.

    Operational features and components of a power conditioning unit for interconnecting solar cell module powers with a utility grid are outlined. The two-stage unit first modifies the voltage to desired levels on an internal dc link, then inverts the current in 2 power transformers connected to a vector summation control to neutralize harmonic distortion up to the 11th harmonic. The system operates in parallel with the grid with extra inductors to absorb line-to-line voltage and phase differences, and permits peak power use from the PV array. Reactive power is gained internally, and a power system controller monitors voltages, frequencies, and currents. A booster preregulator adjusts the input voltage from the array to provide voltage regulation for the inverter, and can commutate 450 amps. A total harmonic distortion of less than 5 percent is claimed, with a rating of 5 kVA, 50/60 Hz, 3-phase, and 4-wire.

  16. Generating units performances: power system requirements

    Energy Technology Data Exchange (ETDEWEB)

    Fourment, C; Girard, N; Lefebvre, H

    1994-08-01

    The part of generating units within the power system is more than providing power and energy. Their performance are not only measured by their energy efficiency and availability. Namely, there is a strong interaction between the generating units and the power system. The units are essential components of the system: for a given load profile the frequency variation follows directly from the behaviour of the units and their ability to adapt their power output. In the same way, the voltage at the units terminals are the key points to which the voltage profile at each node of the network is linked through the active and especially the reactive power flows. Therefore, the customer will experience the frequency and voltage variations induced by the units behaviour. Moreover, in case of adverse conditions, if the units do not operate as well as expected or trip, a portion of the system, may be the whole system, may collapse. The limitation of the performance of a unit has two kinds of consequences. Firstly, it may result in an increased amount of not supplied energy or loss of load probability: for example if the primary reserve is not sufficient, a generator tripping may lead to an abnormal frequency deviation, and load may have to be shed to restore the balance. Secondly, the limitation of a unit performance results in an economic over-cost for the system: for instance, if not enough `cheap` units are able to load-following, other units with higher operating costs have to be started up. We would like to stress the interest for the operators and design teams of the units on the one hand, and the operators and design teams of the system on the other hand, of dialog and information exchange, in operation but also at the conception stage, in order to find a satisfactory compromise between the system requirements and the consequences for the generating units. (authors). 11 refs., 4 figs.

  17. Cost escalation in nuclear power

    International Nuclear Information System (INIS)

    Montomery, W.D.; Quirk, J.P.

    1978-01-01

    This report is concerned with the escalation of capital costs of nuclear central station power plants between the early 1960s and the present. The report presents an historical overview of the development of the nuclear power industry and cost escalation in the industry, using existing data on orders and capital costs. New data are presented on regulatory delays in the licensing process, derived from a concurrent study being carried on in the Social Science group at Caltech. The conclusions of the study are that nuclear capital costs have escalated more rapidly than the GNP deflator or the construction industry price index. Prior to 1970, cost increases are related to bottleneck problems in the nuclear construction and supplying industries and the regulatory process; intervenors play only a minor role in cost escalation. After 1970, generic changes introduced into the licensing process by intervenors (including environmental impact reviews, antitrust reviews, more stringent safety standards) dominate the cost escalation picture, with bottlenecks of secondary importance. Recent increases in the time from application for a construction permit to commercial operation are related not only to intervenor actions, but also to suspensions, cancellations or postponements of construction by utilities due to unfavorable demand or financing conditions

  18. Reference costs for power generation

    International Nuclear Information System (INIS)

    2003-12-01

    The first part of the 2003 study of reference costs for power generation has been completed. It was carried out by the General Directorate for Energy and Raw Materials (DGEMP) of the French Ministry of the Economy, Finance and Industry, with the collaboration of power-plant operators, construction firms and many other experts. A Review Committee of experts including economists (Forecasting Department, French Planning Office), qualified public figures, representatives of power-plant construction firms and operators, and non-governmental organization (NGO) experts, was consulted in the final phase. The study examines the costs of power generated by different methods (i.e. nuclear and fossil-fuel [gas-, coal-, and oil-fired] power plants) in the context of an industrial operation beginning in the year 2015. - The second part of the study relating to decentralized production methods (wind, photovoltaic, combined heat and power) is still in progress and will be presented at the beginning of next year. - 1. Study approach: The study is undertaken mainly from an investor's perspective and uses an 8% discount rate to evaluate the expenses and receipts from different years. In addition, the investment costs are considered explicitly in terms of interest during construction. - 2. Plant operating on a full-time basis (year-round): The following graph illustrates the main conclusions of the study for an effective operating period of 8000 hours. It can be seen that nuclear is more competitive than the other production methods for a year-round operation with an 8% discount rate applied to expenses. This competitiveness is even better if the costs related to greenhouse-gas (CO 2 ) emission are taken into account in estimating the MWh cost price. Integrating the costs resulting from CO 2 emissions by non-nuclear fuels (gas, coal), which will be compulsory as of 2004 with the transposition of European directives, increases the total cost per MWh of these power generation methods

  19. Expanding the usefulness of unit supply cost

    International Nuclear Information System (INIS)

    McKenzie, M.B.; Petr, K.

    1992-01-01

    Unit supply cost is a widely used tool in the energy business for providing a one number-unit cost description. For example, controllable costs such as finding costs, development costs and operating costs have traditionally been described in an average cost per unit of reserves format for the oil and gas industry, however using this approach on more specific applications is not always informative. Projects with widely varying controllable parameters can still yield the same unit cost, making comparisons difficult. The application of unit supply cost can be readily expanded by adding a new unit cost component termed cost of capital. This element introduces the impacts of timing and return on investment into the supply cost determination through discounting annual costs. The cost of capital component adds the ability to represent a project's unique characteristics, particularly reserves' depletion rate and the timing or phasing of development. Introducing the cost of capital element into the supply cost analysis provides additional information and improves the likelihood of drawing correct conclusions when comparing and ranking projects. 4 figs., 6 tabs

  20. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  1. About choosing the power unit of NPP

    International Nuclear Information System (INIS)

    Alekseev, P.N.; Mordashev, V.M.; Proshkin, A.A.; Stukalov, V.A.; Subbotin, S.A.; Tsibul'skij, V.F.; Chernilin, Yu.F.

    2008-01-01

    The present-day domestic nuclear power industry faces the necessity to make both process and economy related decisions. The mentioned decisions should cover all the aspects of the nuclear power complex. In particular, as of now, no substantiation of the present-day and the future requirements for the power unit of the WWER and fast reactor NPPs is available. The choice of the unit power of an NPP should involve consideration of all factors and should not be boiled down to the efforts to ensure the minimization of the investment and the operation constituents of the electric power generation costs. The aim of the present paper was to ensure elaboration of the recommendations to substantiate the optimal unit power of NPP power units based on the analysis of various factors to design, to construct and to operate an NPP (investment, time of construction, the unscheduled shutdown losses, the unification, the fabrication quality, the accident damage, etc.), and the electrical network potentialities and the regional electric power demands [ru

  2. Drivers of imbalance cost of wind power

    DEFF Research Database (Denmark)

    Obersteiner, C.; Siewierski, T.; Andersen, Anders

    2010-01-01

    In Europe an increasing share of wind power is sold on the power market. Therefore more and more wind power generators become balancing responsible and face imbalance cost that reduce revenues from selling wind power. A comparison of literature illustrates that the imbalance cost of wind power...... varies in a wide range. To explain differences we indentify parameters influencing imbalance cost and compare them for case studies in Austria, Denmark and Poland. Besides the wind power forecast error also the correlation between imbalance and imbalance price influences imbalance cost significantly...... of imperfect forecast is better suited to reflect real cost incurred due to inaccurate wind power forecasts....

  3. Hidden costs of nuclear power

    International Nuclear Information System (INIS)

    England, R.W.

    1979-01-01

    Mr. England contends that these hidden costs add up to a figure much higher than those that appear in the electric utilities' profit and loss account - costs that are borne by Federal taxpayers, by nuclear industry workers, and by all those people who must share their environment with nuclear facilities. Costs he details are additional deaths and illnesses resulting from exposure to radiation, and the use of tax dollars to clean up the lethal garbage produced by those activities. He asserts that careless handling of uranium ore and mill tailings in past years has apparently resulted in serious public health problems in those mining communities. In another example, Mr. England states that the failure to isolate uranium tailings physically from their environment has probably contributed to an acute leukemia rate in Mesa County, Colorado. He mentions much of the technology development for power reactors being done by the Federal government, not by private reactor manufacturers - thus, again, hidden costs that do not show up in electric bills of customers. The back end of the nuclear fuel cycle as a place for Federally subsidized research and development is discussed briefly. 1 figure, 2 tables

  4. Nuclear Power Plant Module, NPP-1: Nuclear Power Cost Analysis.

    Science.gov (United States)

    Whitelaw, Robert L.

    The purpose of the Nuclear Power Plant Modules, NPP-1, is to determine the total cost of electricity from a nuclear power plant in terms of all the components contributing to cost. The plan of analysis is in five parts: (1) general formulation of the cost equation; (2) capital cost and fixed charges thereon; (3) operational cost for labor,…

  5. Cost reduction potentials in the German market for balancing power

    International Nuclear Information System (INIS)

    Flinkerbusch, Kai; Heuterkes, Michael

    2010-01-01

    This article examines potential cost reductions in the market for balancing power by pooling all four German control areas. In a united control area both the procurement and the production of balancing power may be more efficient than in four separated control areas. Our data contain bids on energy procurement as well as balancing power flows in the period from December 2007 to November 2008. A reference scenario simulates the market results for secondary and tertiary balancing power. Subsequently, we simulate a united control area. We show that in the period under review the total costs of balancing power are reduced by 17%. (author)

  6. Architecture of nuclear power units

    International Nuclear Information System (INIS)

    Malaniuk, B.

    1981-01-01

    Nuclear units with circulation cooling using cooling towers are dominating points of the landscape. The individual cooling towers or pairs of cooling towers should be situated in the axes of double units and should also linearly be arranged, rhythmically in the respective zone. Examples are shown of the architectural designs of several nuclear power plants in the USA, the UK, the USSR, France, the FRG and Italy. (H.S.)

  7. Forest management units through cost

    Directory of Open Access Journals (Sweden)

    Cristina Tenovici

    2010-12-01

    Full Text Available Costs minimizing and profit maximizing make the costs adjustment seems to be a vital necessity when the activity developed within the company does not assure the maintenance and stability of the necessary relation between consuming factors and costs. In such circumstances, approaching differing sides of the production cost and improving the methods of calculation has much significance in determining the most appropriate measures necessary for its adjustment and for profit increasing. The whole informational process of costs – formation, control and analysis of costs – involves a careful use the methodological concepts known under the name of classical methods and modern or complementary methods, as well as of other proceedings. Such methods and proceedings cannot be applied separately, only conjugated and integrated in a unitary methodological system, each of these methods and proceedings participating at achieving one or more objectives. Only by their unitary action they can fulfill all the system objective.

  8. PPICA, Power Plant Investment Cost Analysis

    International Nuclear Information System (INIS)

    Lefevre, J.C.

    2002-01-01

    1 - Description of program or function: This software package contains two modules: - CAPITAL1 calculates investment costs from overnight costs, based on the capital structure of the utility (debt/equity ratio), return and interest rates according to the type of securities involved, and a standard-shaped curve of capital outlays during construction of a power plant. - FCRATE1 calculates the year-by-year revenue requirements to cover the capital-related charges incurred by the new investment and their economic equivalent: the levelled fixed-charge rate and capital contribution to the levelled unit power generation cost per kWh. They are proposed as an alternative to the corresponding modules CAPITAL and FCRATE, included in the LPGC (Levelled Power Generation Cost) suite of codes developed by ORNL and US-DOE. They perform the same type of analysis and provide the same results. 2 - Methods: Results output from CAPITAL1, in terms of the initial investment at startup and the fraction thereof that is allowable for tax depreciation, can be transferred automatically as data input to FCRATE1. Other user-defined data are: the project life, the time horizon of the economic analysis (which does not necessarily coincide with the project life), the plant load factor (lifetime average), the tax rate applicable to utility's income, the tax depreciation scheme and the tax charge accounting method (normalised or flow- through). The results of CAPITAL1 and FCRATE1 are expressed both in current money and in constant money of a reference year. Inflation rate and escalation rate of construction expenditures during construction period, and of fixed charges during service life are defined by the user. The discount rate is set automatically by the programme, equal to the weighted average tax-adjusted cost of money. 3 - Restrictions on the complexity of the problem: CAPITAL1 and FCRATE1 are 'alternatives', not 'substitutes', to the corresponding programs CAPITAL and FCRATE of the LPGC

  9. High cost of nuclear power plants

    International Nuclear Information System (INIS)

    Bassett, C.

    1978-01-01

    Retroactive safety standards were found to account for over half the costs of a nuclear power plant and point up the need for an effective cost-benefit analysis of changes made by the Nuclear Regulatory Commission after construction has started. The author compared the Davis-Besse Unit No. 1 construction-cost estimates with the final-cost increases during a rate-case investigation in Ohio. He presents data furnished for ten of the largest construction contracts to illustrate the cost increases involving fixed hardware and intensive labor. The situation was found to repeat with other utilities across the country even though safeguards against irresponsible low bidding were introduced. Low bidding was found to continue, encouraged by the need for retrofitting to meet regulation changes. The average cost per kilowatt of major light-water reactors is shown to have increased from $171 in 1970 to $555 in 1977, while construction duration increased from 43.4 to 95.6 months during the same period

  10. The costs of completing unfinished US nuclear power plants

    International Nuclear Information System (INIS)

    Feldman, S.L.; Bernstein, M.A.; Noland, R.B.

    1988-01-01

    A cost benefit analysis is performed to assess the costs of completing unfinished nuclear power plants in four regions of the United States of America, (north-east, south-east, mid-west and west). The analysis is in five main sections: the projection of the cost to complete nuclear plants under construction, the forecast of future operations and maintenance costs, the forecast of price of fuels, the evaluation of future electricity demand and capacity growth, and calculation of the financial cost-benefit ratio based on the preceding figures. It was found that in the north-east, mid-west and west, because the demand for the power will not be made before the year 2000, finishing the units is not the least-cost supply option. Therefore, most of the units should not be finished unless over 90% completed already, in which case it may be cost-effective to finish them. (author)

  11. An Application of a Costing Methodology to Waste-to-Energy Power Generating Units at Remote Sites and Wright-Patterson Air Force Base.

    Science.gov (United States)

    1983-09-01

    which were based on off-season, summer prices and demand C4 143-8], and placed mandatory controls on all petroleum product prices s6:136]. These...Service, September 1982. Hausman , J. A., and P. L. Joskow. "Evaluating the Costs and Benefits of Appliance Efficiency Standards," American Economic...Department of Agriculture, Washington: United States Government Printing Office, March 4, 1989. Zoch, Lawrence L., Jr., Jack J. Rusch, and Edward L. Springer

  12. Reversing nuclear power cost trends

    International Nuclear Information System (INIS)

    Corey, G.R.; Peoples, D.L.

    1988-01-01

    Nuclear power production expenses rose steadily during the 5-year period 1979 through 1984 at rates ranging from 15 to 25% per year for nonfuel expenses. During that period, fuel costs rose about 14% per year. Experience of the past few years demonstrates that significant economies-of-scale do exist in plant operation and maintenance. A regional operating company could exploit such economies-of-scale and would also be expected to attract and retain a more-experienced and stable staff. Over the years, that combination should significantly improve plant operating performance and safety. The net effect would be a combination of reduced operating expenses; improved availability; higher capacity factors; and, possibly, lower heat rates. In an era of increasing competition within energy business, all options should be considered carefully. Bold innovation will be the key to a nuclear future. 5 references, 8 figures

  13. Analysis of nuclear power plant construction costs

    International Nuclear Information System (INIS)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs

  14. Analysis of nuclear power plant construction costs

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

  15. Power plant asset market evaluations: Forecasting the costs of power production

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S.A.; Grunsrud, G.P. [Aptech Engineering Services, Inc., Sunnyvale, CA (United States)

    1998-12-31

    This presentation discusses the process of evaluating and valuing power plants for sale. It describes a method to forecast the future costs at a power plant using a portion of the past fixed costs, variable energy costs, and most importantly the variable cycling-related wear-and-tear costs. The presentation then discusses how to best determine market share, expected revenues, and then to forecast plant future costs based on future expected unit cycling operations. The presentation concludes with a section on recommendations to power plant buyers or sellers on how to manage the power plant asset and how to increase its market value. (orig.) 4 refs.

  16. Power plant asset market evaluations: Forecasting the costs of power production

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S A; Grunsrud, G P [Aptech Engineering Services, Inc., Sunnyvale, CA (United States)

    1999-12-31

    This presentation discusses the process of evaluating and valuing power plants for sale. It describes a method to forecast the future costs at a power plant using a portion of the past fixed costs, variable energy costs, and most importantly the variable cycling-related wear-and-tear costs. The presentation then discusses how to best determine market share, expected revenues, and then to forecast plant future costs based on future expected unit cycling operations. The presentation concludes with a section on recommendations to power plant buyers or sellers on how to manage the power plant asset and how to increase its market value. (orig.) 4 refs.

  17. Power plant asset market evaluations: Forecasting the costs of power production

    International Nuclear Information System (INIS)

    Lefton, S.A.; Grunsrud, G.P.

    1998-01-01

    This presentation discusses the process of evaluating and valuing power plants for sale. It describes a method to forecast the future costs at a power plant using a portion of the past fixed costs, variable energy costs, and most importantly the variable cycling-related wear-and-tear costs. The presentation then discusses how to best determine market share, expected revenues, and then to forecast plant future costs based on future expected unit cycling operations. The presentation concludes with a section on recommendations to power plant buyers or sellers on how to manage the power plant asset and how to increase its market value. (orig.) 4 refs

  18. Concentration of WWER-1000 unit power on one site

    International Nuclear Information System (INIS)

    Rousek, J.; Kysel, J.; Sladek, V.

    1987-01-01

    The problem of a suitable number of nuclear power plant units built on one site is discussed. Using an example of three sites being prepared now in Czechoslovakia, two alternatives - one with two WWER-1000 units, the other with four WWER-1000 units on one site - are evaluated from the viewpoint of long-range nuclear power development program in Czechoslovakia, costs, transmission of electric power and heat supply. (author). 10 tabs., 13 refs

  19. Nuclear power costs in the build, operate, transfer approach

    International Nuclear Information System (INIS)

    Aybers, M.N.; Sahin, B.

    1990-01-01

    The costs of nuclear power are discussed with special reference to the economic problems faced by developing countries, and the relative merit of a new accounting approach, viz., the build, operate, transfer contract model, which was proposed in Turkey for the Akkuyu nuclear power project, is illustrated. In this context, the general methodology of calculating nuclear power costs is summarized and a capital cost analysis for a 986 MW pressurized water reactor plant is given in terms of constant monetary units for the above contract model and the turnkey contract model. Adjustment of the costs taking into account regional conditions such as inflation and higher interest rates is also indicated. (orig.) [de

  20. Reduction of capital costs of nuclear power plants

    International Nuclear Information System (INIS)

    2000-01-01

    The competitiveness of nuclear power plants depends largely on their capital costs represent some 60 per cent of their total generation costs. Reviewing and analysing ways and means to reduce capital costs of nuclear power plants are essential to enhance the economic viability of the nuclear option. The report is based upon cost information and data provided by experts from NEA Member countries. It investigates the efficiency of alternative methods for reducing capital costs of nuclear units. It will provide stakeholders from the industry and governmental agencies with relevant elements in support of policy making. (author)

  1. Cost of unserved power in Karnataka, India

    International Nuclear Information System (INIS)

    Bose, Ranjan Kumar; Shukla, Megha; Srivastava, Leena; Yaron, Gil

    2006-01-01

    This paper proposes an empirical analysis concerning the cost of unserved energy (CUE) or value of lost load in agriculture and industrial sectors and provides insights that can provide useful inputs in designing effective policies for the power sector. About 500 manufacturing units and 900 farmers were surveyed in the south Indian state of Karnataka using a two-stage random sampling to provide interval estimates of CUE for the industrial and agricultural consumers. The results from the survey help in providing guidance on consumer perceptions and their willingness to pay different or higher tariffs. The estimated economic loss due to power outage in the agriculture sector varies from 1.9% to 3.6% of total State Domestic Product (SDP), i.e., Rs 950 billion at 1999/2000 prices, while in industry, the economic loss varies between 0.04% and 0.17% of total SDP depending upon the size of industry during the study period in 1999

  2. Unit costs in international economic evaluations: resource costing of the Schizophrenia Outpatient Health Outcomes Study.

    Science.gov (United States)

    Urdahl, H; Knapp, M; Edgell, E T; Ghandi, G; Haro, J M

    2003-01-01

    We present unit costs corresponding to resource information collected in the Schizophrenia Outpatient Health Outcomes (SOHO) Study. The SOHO study is a 3-year, prospective, observational study of health outcomes associated with antipsychotic treatment in out-patients treated for schizophrenia. The study is being conducted across 10 European countries (Denmark, France, Germany, Greece, Ireland, Italy, the Netherlands, Portugal, Spain and the UK) and includes over 10,800 patients and over 1000 investigators. To identify the best available unit costs of hospital admissions, day care and psychiatrist out-patient visits, a tariff-based approach was used. Unit costs were obtained for nine of the 10 countries and were adjusted to 2000 price levels by consumer price indices and converted to US dollars using purchasing power parity rates (and on to Euro). The paper illustrates the need to balance the search for sound unit costs with pragmatic solutions in the costing of international economic evaluations.

  3. Unit labour costs, productivity and international competitiveness

    NARCIS (Netherlands)

    Ark, Bart van; Stuivenwold, Edwin; Ypma, Gerard

    2005-01-01

    This paper provides international comparisons of relative levels of unit labour costs (ULC) for several OECD countries relative to the United States. The estimates are based on the Total Economy Database and the 60-Industry Database of the Groningen Growth and Development Centre (GGDC), and are also

  4. Low-cost inertial measurement unit.

    Energy Technology Data Exchange (ETDEWEB)

    Deyle, Travis Jay

    2005-03-01

    Sandia National Laboratories performs many expensive tests using inertial measurement units (IMUs)--systems that use accelerometers, gyroscopes, and other sensors to measure flight dynamics in three dimensions. For the purpose of this report, the metrics used to evaluate an IMU are cost, size, performance, resolution, upgradeability and testing. The cost of a precision IMU is very high and can cost hundreds of thousands of dollars. Thus the goals and results of this project are as follows: (1) Examine the data flow in an IMU and determine a generic IMU design. (2) Discuss a high cost IMU implementation and its theoretically achievable results. (3) Discuss design modifications that would save money for suited applications. (4) Design and implement a low cost IMU and discuss its theoretically achievable results. (5) Test the low cost IMU and compare theoretical results with empirical results. (6) Construct a more streamlined printed circuit board design reducing noise, increasing capabilities, and constructing a self-contained unit. Using these results, we can compare a high cost IMU versus a low cost IMU using the metrics from above. Further, we can examine and suggest situations where a low cost IMU could be used instead of a high cost IMU for saving cost, size, or both.

  5. Nuclear power costs in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Sweet, C [Polytechnic of the South Bank, London (UK)

    1978-06-01

    An attempt is made to assess the available evidence on nuclear power costs, to evaluate the adequacy of published statistics, and to determine where the balance of advantage lies. The case rests on four factors - the load factor, calculations of fuel and capital costs, research and development costs, and most importantly, whether there is net benefit over costs. It is felt that if the flow of information concerning the difficult and confusing position in which the nuclear power industry finds itself could be increased then the quality of research in the field of costing nuclear programmes and evaluating their social overhead costs could be improved.

  6. Historical construction costs of global nuclear power reactors

    International Nuclear Information System (INIS)

    Lovering, Jessica R.; Yip, Arthur; Nordhaus, Ted

    2016-01-01

    The existing literature on the construction costs of nuclear power reactors has focused almost exclusively on trends in construction costs in only two countries, the United States and France, and during two decades, the 1970s and 1980s. These analyses, Koomey and Hultman (2007); Grubler (2010), and Escobar-Rangel and Lévêque (2015), study only 26% of reactors built globally between 1960 and 2010, providing an incomplete picture of the economic evolution of nuclear power construction. This study curates historical reactor-specific overnight construction cost (OCC) data that broaden the scope of study substantially, covering the full cost history for 349 reactors in the US, France, Canada, West Germany, Japan, India, and South Korea, encompassing 58% of all reactors built globally. We find that trends in costs have varied significantly in magnitude and in structure by era, country, and experience. In contrast to the rapid cost escalation that characterized nuclear construction in the United States, we find evidence of much milder cost escalation in many countries, including absolute cost declines in some countries and specific eras. Our new findings suggest that there is no inherent cost escalation trend associated with nuclear technology. - Highlights: •Comprehensive analysis of nuclear power construction cost experience. •Coverage for early and recent reactors in seven countries. •International comparisons and re-evaluation of learning. •Cost trends vary by country and era; some experience cost stability or decline.

  7. Maintenance cost models in deregulated power systems under opportunity costs

    International Nuclear Information System (INIS)

    Al-Arfaj, K.; Dahal, K.; Azaiez, M.N.

    2007-01-01

    In a centralized power system, the operator is responsible for scheduling maintenance. There are different types of maintenance, including corrective maintenance; predictive maintenance; preventive maintenance; and reliability-centred maintenance. The main cause of power failures is poor maintenance. As such, maintenance costs play a significant role in deregulated power systems. They include direct costs associated with material and labor costs as well as indirect costs associated with spare parts inventory, shipment, test equipment, indirect labor, opportunity costs and cost of failure. In maintenance scheduling and planning, the cost function is the only component of the objective function. This paper presented the results of a study in which different components of maintenance costs were modeled. The maintenance models were formulated as an optimization problem with single and multiple objectives and a set of constraints. The maintenance costs models could be used to schedule the maintenance activities of power generators more accurately and to identify the best maintenance strategies over a period of time as they consider failure and opportunity costs in a deregulated environment. 32 refs., 4 tabs., 4 figs

  8. Cost estimating for CERCLA remedial alternatives a unit cost methodology

    International Nuclear Information System (INIS)

    Brettin, R.W.; Carr, D.J.; Janke, R.J.

    1995-06-01

    The United States Environmental Protection Agency (EPA) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA, Interim Final, dated October 1988 (EPA 1988) requires a detailed analysis be conducted of the most promising remedial alternatives against several evaluation criteria, including cost. To complete the detailed analysis, order-of-magnitude cost estimates (having an accuracy of +50 percent to -30 percent) must be developed for each remedial alternative. This paper presents a methodology for developing cost estimates of remedial alternatives comprised of various technology and process options with a wide range of estimated contaminated media quantities. In addition, the cost estimating methodology provides flexibility for incorporating revisions to remedial alternatives and achieves the desired range of accuracy. It is important to note that the cost estimating methodology presented here was developed as a concurrent path to the development of contaminated media quantity estimates. This methodology can be initiated before contaminated media quantities are estimated. As a result, this methodology is useful in developing cost estimates for use in screening and evaluating remedial technologies and process options. However, remedial alternative cost estimates cannot be prepared without the contaminated media quantity estimates. In the conduct of the feasibility study for Operable Unit 5 at the Fernald Environmental Management Project (FEMP), fourteen remedial alternatives were retained for detailed analysis. Each remedial alternative was composed of combinations of remedial technologies and processes which were earlier determined to be best suited for addressing the media-specific contaminants found at the FEMP site, and achieving desired remedial action objectives

  9. Unit Commitment With Dynamic Cycling Costs

    OpenAIRE

    Troy, Niamh; Flynn, Damian; Milligan, Michael R.; et al.

    2012-01-01

    Increased competition in the electricity sector and the integration of variable renewable energy sources is resulting in more frequent cycling of thermal plant. Thus, the wear-and-tear to generator components and the related costs are a growing concern for plant owners and system operators alike. This paper presents a formulation that can be implemented in a MIP dispatch model to dynamically model cycling costs based on unit operation. When implemented for a test system, the results show that...

  10. Cost estimates for nuclear power in the UK

    International Nuclear Information System (INIS)

    Harris, Grant; Heptonstall, Phil; Gross, Robert; Handley, David

    2013-01-01

    Current UK Government support for nuclear power has in part been informed by cost estimates that suggest that electricity from new nuclear power stations will be competitive with alternative low carbon generation options. The evidence and analysis presented in this paper suggests that the capital cost estimates for nuclear power that are being used to inform these projections rely on costs escalating over the pre-construction and construction phase of the new build programme at a level significantly below those that have been experienced by past US and European programmes. This paper applies observed construction time and cost escalation rates to the published estimates of capital costs for new nuclear plant in the UK and calculates the potential impact on levelised cost per unit of electricity produced. The results suggest that levelised cost may turn out to be significantly higher than expected which in turn has important implications for policy, both in general terms of the potential costs to consumers and more specifically for negotiations around the level of policy support and contractual arrangements offered to individual projects through the proposed contract for difference strike price. -- Highlights: •Nuclear power projects costs can rise substantially during the construction period. •Pre-construction and construction time can be much longer than anticipated. •Adjusting estimates for observed experience increases levelised costs significantly. •Higher costs suggest that more policy support than envisaged may be required

  11. The hidden costs of nuclear power

    International Nuclear Information System (INIS)

    Keough, C.

    1981-01-01

    The two basic hidden costs of nuclear power are public money and public health. Nuclear power appears to be economical because many of the costs of producins electricity in these plants are paid by the federal government. So, like it or not, the citizens are footing the bill with their taxes. Design and development of plants have been paid for with public money, and disposal and cleanup costs will also be paid in this manner. The economic and health costs associated with nuclear accidents are staggering

  12. Power generation costs for alternate reactor fuel cycles

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.

    1980-09-01

    The total electric generating costs at the power plant busbar are estimated for various nuclear reactor fuel cycles which may be considered for power generation in the future. The reactor systems include pressurized water reactors (PWR), heavy-water reactors (HWR), high-temperature gas cooled reactors (HTGR), liquid-metal fast breeder reactors (LMFBR), light-water pre-breeder and breeder reactors (LWPR, LWBR), and a fast mixed spectrum reactor (FMSR). Fuel cycles include once-through, uranium-only recycle, and full recycle of the uranium and plutonium in the spent fuel assemblies. The U 3 O 8 price for economic transition from once-through LWR fuel cycles to both PWR recycle and LMFBR systems is estimated. Electric power generation costs were determined both for a reference set of unit cost parameters and for a range of uncertainty in these parameters. In addition, cost sensitivity parameters are provided so that independent estimations can be made for alternate cost assumptions

  13. Supply disruption cost for power network planning

    International Nuclear Information System (INIS)

    Kjoelle, G.H.

    1992-09-01

    A description is given of the method of approach to calculate the total annual socio-economic cost of power supply disruption and non-supplied energy, included the utilities' cost for planning. The total socio-economic supply disruption cost is the sum of the customers' disruption cost and the utilities' cost for failure and disruption. The mean weighted disruption cost for Norway for one hour disruption is NOK 19 per kWh. The customers' annual disruption cost is calculated with basis in the specific disruption cost referred to heavy load (January) and dimensioning maximum loads. The loads are reduced by factors taking into account the time variations of the failure frequency, duration, the loads and the disruption cost. 6 refs

  14. Cost allocation. Combined heat and power production

    International Nuclear Information System (INIS)

    Sidzikauskas, V.

    2002-01-01

    The benefits of Combined Heat and Power (CHP) generation are discussed. The include improvement in energy intensity of 1% by 2010, 85-90% efficiency versus 40-50% of condensation power and others. Share of CHP electricity production in ERRA countries is presented.Solutions for a development CHP cost allocation are considered. Conclusion are presented for CHP production cost allocation. (R.P.)

  15. Capital investment costs of nuclear power plants

    International Nuclear Information System (INIS)

    Woite, G.

    1978-01-01

    The purpose of the article is to summarize capital cost experience and estimates in industrialized and developing Member States of the IAEA, and to provide some guidance for cost extrapolation. The relative merits of different types and sizes of nuclear and conventional power plants for an expanding electricity generation system are compared over an adequate planning period

  16. Optimal Power Cost Management Using Stored Energy in Data Centers

    OpenAIRE

    Urgaonkar, Rahul; Urgaonkar, Bhuvan; Neely, Michael J.; Sivasubramaniam, Anand

    2011-01-01

    Since the electricity bill of a data center constitutes a significant portion of its overall operational costs, reducing this has become important. We investigate cost reduction opportunities that arise by the use of uninterrupted power supply (UPS) units as energy storage devices. This represents a deviation from the usual use of these devices as mere transitional fail-over mechanisms between utility and captive sources such as diesel generators. We consider the problem of opportunistically ...

  17. Construction costs of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Mandel, H

    1976-03-01

    It is assumed that the demand for electrical energy will continue to rise and that nuclear power will increasingly supply the base-load of electricity generation in the industrialized world. The author identifies areas where techniques and practices to control costs can be improved. Nuclear power offers an alternative to liquid and gaseous fossil fuels and contributes to a relative stability in the price of electric energy. Nuclear power plants can now generate power more cheaply than other thermal power plants down into the upper middle load sector, as indicated in calculations based on a construction time of six years for nuclear plants and four years for others. Special legal provisions, different conditions of financing and taxation, varying methods of power generation cost accounting, and the nonuniform layout of the plant in the various countries make it difficult to compare power generation costs. The author uses mostly experiences gained in the Federal Republic of Germany for some calculations for comparison; he cites lack of standardization and over-long licensing times as major factors in the recent rapid escalation of nuclear power costs and suggests that adoption of standard reactor designs, encouragement of a vigorous and competitive European nuclear industry, and streamlining of licensing procedures to improve the situation. (MCW)

  18. Review of nuclear power costs around the world

    International Nuclear Information System (INIS)

    Bennett, L.L.; Karousakis, P.M.; Moynet, G.

    1983-01-01

    This paper presents highlights of nuclear power costs around the world from studies carried out by the IAEA and by UNIPEDE. Emphasis is placed on trends within each country of key parameters which affect both investment costs and total power generation costs, including construction and project durations, size of units, regulatory environment, scope of project, fuel cycle costs and general economic conditions. A synthesis of these trends, taking into consideration both nuclear and coal-fired plant capital and fuel costs as they are estimated to evolve in the near and medium term, is presented in terms of nuclear-to-coal cost ratios for both plant investment costs and total generating costs. The plant investment costs are expressed as ''overnight'' or ''fore'' costs, in constant money, for plants expected to enter commercial operation in the early 1990s. Pertinent assumptions are based on conditions prevailing in the particular country under review. These studies indicate that in most countries nuclear plant investment costs are rising more rapidly than the costs for coal-fired plants. A major cause for the rapid rise in nuclear plant costs is the drastic lengthening of project duration in most countries. France, as a notable exception, has been able to maintain a stable and reasonably short project time. In spite of the rapidly escalating nuclear plant investment costs, nuclear electricity generation has an economic advantage over coal in Europe and Canada and is competitive with coal in the eastern and midwestern parts of the United States of America (USA). The availability of abundant, low-cost coal gives coal-fired generation an economic advantage in the western USA. (author)

  19. An Analysis of Unit Costs at a Consolidated Supply Depot

    Science.gov (United States)

    1990-12-01

    Not-For-Profit Setting,"The Accounting Review,July 1990. Horngren , C. T., Cost Accountinq:A Managerial Emphasis,3rd ed, Prentice-Hall Inc.,1972...sector has used concepts of unit costs for 4 decades. Any managerial or cost accounting text discusses in some length unit costs . For Defense contractors...the Cost Accounting Standards Board (CASB) provides guidance for contract costs . Unit costs include direct, indirect, and general and administrative

  20. Regional projections of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1983-12-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base load nuclear and coal-fired power plants with a startup date of January 1995. A complete data set is supplied which specifies each parameter used to obtain the comparative results. When the comparison is based on reference cost parameters, nuclear- and coal-fired generation costs are found to be very close in most regions of the country. Nuclear power is favored in the South Atlantic region where coal must be transported over long distances, while coal-fired generation is favored in the Central and North Central regions where large reserves of cheaply mineable coal exist. The reference data set reflects recent electric utility construction experience. Significantly lower nuclear capital investment costs would result if regulatory reform and improved construction practices were instituted. The electric power generation costs for base load oil- and natural gas-fired plants were also estimated. These plants were found to be noncompetitive in all regions for those scenarios most likely to develop. Generation cost sensitivity to changes in various parameters was examined at a reference location. The sensitivity parameters included capital investment costs, lead times, capacity factors, costs of money, and coal and uranium prices. In addition to the levelized lifetime costs, year-by-year cash flows and revenue requirements are presented. The report concludes with an analysis of the economic merits of recycling spent fuel in light-water reactors

  1. Reference costs of the electric power production

    International Nuclear Information System (INIS)

    2003-06-01

    This study periodically realized by the DGEMP aims to compare the competitiveness of the different channels of electric power production, for different utilization conditions. The first part ''reference costs of the 2003 electric power production'' examines the prices of the electric power produced by different channels in particular in the framework of the industrial implementing in 2015. The nuclear and thermal power plants are concerned. The second part is devoted to the decentralized production channels (wind energy, photovoltaic, cogeneration heat-electricity) is under construction and will be presented next year. (A.L.B.)

  2. Portable Power And Digital-Communication Units

    Science.gov (United States)

    Levin, Richard R.; Henry, Paul K.; Rosenberg, Leigh S.

    1992-01-01

    Conceptual network of electronic-equipment modules provides electrical power and digital radio communications at multiple sites not served by cables. System includes central communication unit and portable units powered by solar photovoltaic arrays. Useful to serve equipment that must be set up quickly at remote sites or buildings that cannot be modified to provide cable connections.

  3. Marginal cost application in the power industry

    International Nuclear Information System (INIS)

    Twardy, L.; Rusak, H.

    1994-01-01

    Two kind of marginal costs, the short-run and the long-run, are defined. The former are applied in conditions when the load increase is not accompanied neither by the increase of the transmission capacity not the installed capacity while the latter assume new investments to expand the power system. The long-run marginal costs be used to forecast optimized development of the system. They contain two main components: the marginal costs of capacity and the marginal costs of energy. When the long-run marginal costs are calculated, each component is considered for particular voltage levels, seasons of the year, hours of the day - selected depending on the system reliability factor as well as on its load level. In the market economy countries the long-run marginal costs can be used for setting up the electric energy tariffs. (author). 7 refs, 11 figs

  4. Impact of environmental cost on economics of thermal power plant. Paper no. IGEC-1-007

    International Nuclear Information System (INIS)

    Chandra, H.; Kaushik, S.C.; Chandra, A.

    2005-01-01

    Cost analysis per unit of power generation have been performed for coal based thermal power plant situated in Dadri (UP) for Indian and imported coal from Australia and America. In our study it has been found that it is better to use imported coal in Indian thermal power plants with advantages like low environmental, investment and total cost per unit of power generation. The effect of percent excess air and plant load factor on total cost per unit of power generation is also analyzed. (author)

  5. Nuclear power plant decommissioning costs in perspective

    International Nuclear Information System (INIS)

    Rothwell, Geoffrey; Deffrennes, Marc; Weber, Inge

    2016-01-01

    At the international level, actual experience is limited in the completion of nuclear power plant decommissioning projects. Cost data for decommissioning projects are thus largely unavailable, with few examples of analyses or comparisons between estimates and actual costs at the project level. The Nuclear Energy Agency (NEA) initiated a project to address this knowledge gap and in early 2016 published the outcomes in the report on Costs of Decommissioning Nuclear Power Plants. The study reviews decommissioning costs and funding practices adopted by NEA member countries, based on the collection and analysis of survey data via a questionnaire. The work was carried out in co-operation with the International Atomic Energy Agency (IAEA) and the European Commission (EC). (authors)

  6. Allocating nuclear power plant costs: an extension

    International Nuclear Information System (INIS)

    Bierman, H. Jr.

    1984-01-01

    The author modifies and extends the argument presented in the September 22, 1983 issue by Richard E. Nellis for using economic depreciation to allocate nuclear power plant costs. The two goals of his model are to charge constant real costs to consumers and to provide a fair return of .125 to investors in each period. The addition of other objectives requires further modification of the model since the schedule of revenues that are deemed to be optimum defines the depreciation schedule. 1 table

  7. BN-1200 Reactor Power Unit Design Development

    International Nuclear Information System (INIS)

    Vasilyev, B.A.; Shepelev, S.F.; Ashirmetov, M.R.; Poplavsky, V.M.

    2013-01-01

    Main goals of BN-1200 design: • Develop a reliable new generation reactor plant for the commercial power unit with fast reactor to implement the first-priority objectives in changing over to closed nuclear fuel cycle; • Improve technical and economic indices of BN reactor power unit to the level of those of Russian VVER of equal power; • Enhance the safety up to the level of the requirements for the 4th generation RP

  8. International cost relations in electric power generation

    International Nuclear Information System (INIS)

    Schmitt, D.; Duengen, H.; Wilhelm, M.

    1986-01-01

    In spite of the fact that analyses of the cost of electric power generation as the result of international comparative evaluations are indisputably relevant, problems pending in connection with the costs of representative power plant technologies are of the methodological bind. German authors have hitherto also been failing to clear up and consider all aspects connected with the problems of data acquisition and the adequate interpretation of results. The analysis presented by the paper abstracted therefore aims at the following: 1) Systematization of the different categories of cost relevant in connection with international comparative evaluation. Classification into different categories of decision making and development of standards meeting the requirements of international comparative evaluation. 2) Calculation of relevant average financial costs of Western German, America and French fossil-fuel and nuclear power plants by means of adequate calculation models, that is the assessment of costs with regard to countries and power plant technologies which are relevant to the Federal Republic of Germany. 3) Analysis of the resulting differences and determinantal interpretation. (orig./UA) [de

  9. Danish Wind Power Export and Cost

    DEFF Research Database (Denmark)

    Lund, Henrik; Hvelplund, Frede; Alberg Østergaard, Poul

    In a normal wind year, Danish wind turbines generate the equivalent of approx. 20 percent of the Danish electricity demand. This paper argues that only approx. 1 percent of the wind power production is exported. The rest is used to meet domestic Danish electricity demands. The cost of wind power...... misleading. The cost of CO2 reduction by use of wind power in the period 2004-2008 was only 20 EUR/ton. Furthermore, the Danish wind turbines are not paid for by energy taxes. Danish wind turbines are given a subsidy via the electricity price which is paid by the electricity consumers. In the recent years...... is paid solely by the electricity consumers and the net influence on consumer prices was as low as 1-3 percent on average in the period 2004-2008. In 2008, the net influence even decreased the average consumer price, although only slightly. In Denmark, 20 percent wind power is integrated by using both...

  10. Estimating Power Outage Cost based on a Survey for Industrial Customers

    Science.gov (United States)

    Yoshida, Yoshikuni; Matsuhashi, Ryuji

    A survey was conducted on power outage cost for industrial customers. 5139 factories, which are designated energy management factories in Japan, answered their power consumption and the loss of production value due to the power outage in an hour in summer weekday. The median of unit cost of power outage of whole sectors is estimated as 672 yen/kWh. The sector of services for amusement and hobbies and the sector of manufacture of information and communication electronics equipment relatively have higher unit cost of power outage. Direct damage cost from power outage in whole sectors reaches 77 billion yen. Then utilizing input-output analysis, we estimated indirect damage cost that is caused by the repercussion of production halt. Indirect damage cost in whole sectors reaches 91 billion yen. The sector of wholesale and retail trade has the largest direct damage cost. The sector of manufacture of transportation equipment has the largest indirect damage cost.

  11. Environmental cost/benefit analysis for fusion power plants

    International Nuclear Information System (INIS)

    Young, J.R.

    1976-11-01

    This document presents a cost/benefit analysis of use of fusion power plants early in the 21st century. The first section describes the general formulation of the analysis. Included are the selection of the alternatives to the fusion reactor, selection of the power system cases to be compared, and a general comparison of the environmental effects of the selected alternatives. The second section compares the cumulative environmental effects from 2010 to 2040 for the primary cases of the power system with and without fusion reactors. The third section briefly illustrates the potential economic benefits if fusion reactors produce electricity at a lower unit cost than LMFBRs can. The fourth section summarizes the cost/benefit analysis

  12. Cost optimisation studies of high power accelerators

    Energy Technology Data Exchange (ETDEWEB)

    McAdams, R.; Nightingale, M.P.S.; Godden, D. [AEA Technology, Oxon (United Kingdom)] [and others

    1995-10-01

    Cost optimisation studies are carried out for an accelerator based neutron source consisting of a series of linear accelerators. The characteristics of the lowest cost design for a given beam current and energy machine such as power and length are found to depend on the lifetime envisaged for it. For a fixed neutron yield it is preferable to have a low current, high energy machine. The benefits of superconducting technology are also investigated. A Separated Orbit Cyclotron (SOC) has the potential to reduce capital and operating costs and intial estimates for the transverse and longitudinal current limits of such machines are made.

  13. Cycling of conventional power plants: Technical limits and actual costs

    International Nuclear Information System (INIS)

    Van den Bergh, Kenneth; Delarue, Erik

    2015-01-01

    Highlights: • Literature reports a wide range of cycling parameters (technical and cost-related). • The impact of different cycling parameters is assessed. • The German 2013 system is studied as a case study. • Even for stringent parameters, the dynamic limit of the portfolio is not reached. • Cycling costs can be reduced with 40% when taken into account in the scheduling. - Abstract: Cycling of conventional generation units is an important source of operational flexibility in the electricity generation system. Cycling is changing the power output of conventional units by means of ramping and switching (starting up and shutting down). In the literature, a wide range of technical and cost-related cycling parameters can be found. Different studies allocate different cycling parameters to similar generation units. This paper assesses the impact of different cycling parameters allocated to a conventional generation portfolio. Both the technical limitations of power plants and all costs related to cycling are considered. The results presented in this paper follow from a unit commitment model, used for a case study based on the German 2013 system. The conventional generation portfolio has to deliver different residual load time series, corresponding to different levels of renewables penetration. The study shows, under the assumptions made, that although the dynamic limits of some units are reached, the limits of the conventional generation portfolio as a whole are not reached, even if stringent dynamic parameters are assigned to the generation portfolio and a highly variable residual load is imposed to the system. The study shows also the importance of including full cycling costs in the unit commitment scheduling. The cycling cost can be reduced by up to 40% when fully taken into account

  14. Two wind power prognosis criteria and regulating power costs

    DEFF Research Database (Denmark)

    Nielsen, Claus S.; Ravn, Hans F.; Schaumburg-Müller, Camilla

    2003-01-01

    . Basically, the choice is between focusing on predicting the energy content of the wind and focusing on the cost of buying regulating power to compensate for the prognosis errors. It will be shown that it can be expected that the two power curves thus estimated will differ, and that therefore also the hourly......The objective of the present work is to investigate the consequences of the choice of criterion in short-term wind power prognosis. This is done by investigating the consequences of choice of objective function in relation to the estimation of the power curve that is applied in the prognoses...... wind power production predicted will differ. In turn this will influence the operation and economics of the system. The consequences of this are illustrated by application to the integration of wind power in the Danish parts of the Nordpool area, using recent data. Using a regression analysis...

  15. Power generation choices: costs, risks and externalities

    International Nuclear Information System (INIS)

    1994-01-01

    This document from OECD deals with the choices between the different means of producing electricity: supply and demand trends, power generation choices, management of development and technologies, environmental impacts and costs around energy sources. Separate abstracts were prepared for all the papers of this volume. (TEC)

  16. User manual for PACTOLUS: a code for computing power costs

    International Nuclear Information System (INIS)

    Huber, H.D.; Bloomster, C.H.

    1979-02-01

    PACTOLUS is a computer code for calculating the cost of generating electricity. Through appropriate definition of the input data, PACTOLUS can calculate the cost of generating electricity from a wide variety of power plants, including nuclear, fossil, geothermal, solar, and other types of advanced energy systems. The purpose of PACTOLUS is to develop cash flows and calculate the unit busbar power cost (mills/kWh) over the entire life of a power plant. The cash flow information is calculated by two principal models: the Fuel Model and the Discounted Cash Flow Model. The Fuel Model is an engineering cost model which calculates the cash flow for the fuel cycle costs over the project lifetime based on input data defining the fuel material requirements, the unit costs of fuel materials and processes, the process lead and lag times, and the schedule of the capacity factor for the plant. For nuclear plants, the Fuel Model calculates the cash flow for the entire nuclear fuel cycle. For fossil plants, the Fuel Model calculates the cash flow for the fossil fuel purchases. The Discounted Cash Flow Model combines the fuel costs generated by the Fuel Model with input data on the capital costs, capital structure, licensing time, construction time, rates of return on capital, tax rates, operating costs, and depreciation method of the plant to calculate the cash flow for the entire lifetime of the project. The financial and tax structure for both investor-owned utilities and municipal utilities can be simulated through varying the rates of return on equity and debt, the debt-equity ratios, and tax rates. The Discounted Cash Flow Model uses the principal that the present worth of the revenues will be equal to the present worth of the expenses including the return on investment over the economic life of the project. This manual explains how to prepare the input data, execute cases, and interpret the output results with the updated version of PACTOLUS. 11 figures, 2 tables

  17. User manual for PACTOLUS: a code for computing power costs.

    Energy Technology Data Exchange (ETDEWEB)

    Huber, H.D.; Bloomster, C.H.

    1979-02-01

    PACTOLUS is a computer code for calculating the cost of generating electricity. Through appropriate definition of the input data, PACTOLUS can calculate the cost of generating electricity from a wide variety of power plants, including nuclear, fossil, geothermal, solar, and other types of advanced energy systems. The purpose of PACTOLUS is to develop cash flows and calculate the unit busbar power cost (mills/kWh) over the entire life of a power plant. The cash flow information is calculated by two principal models: the Fuel Model and the Discounted Cash Flow Model. The Fuel Model is an engineering cost model which calculates the cash flow for the fuel cycle costs over the project lifetime based on input data defining the fuel material requirements, the unit costs of fuel materials and processes, the process lead and lag times, and the schedule of the capacity factor for the plant. For nuclear plants, the Fuel Model calculates the cash flow for the entire nuclear fuel cycle. For fossil plants, the Fuel Model calculates the cash flow for the fossil fuel purchases. The Discounted Cash Flow Model combines the fuel costs generated by the Fuel Model with input data on the capital costs, capital structure, licensing time, construction time, rates of return on capital, tax rates, operating costs, and depreciation method of the plant to calculate the cash flow for the entire lifetime of the project. The financial and tax structure for both investor-owned utilities and municipal utilities can be simulated through varying the rates of return on equity and debt, the debt-equity ratios, and tax rates. The Discounted Cash Flow Model uses the principal that the present worth of the revenues will be equal to the present worth of the expenses including the return on investment over the economic life of the project. This manual explains how to prepare the input data, execute cases, and interpret the output results. (RWR)

  18. The true costs of nuclear power

    International Nuclear Information System (INIS)

    Wallner, A.; Mraz, G.

    2013-01-01

    Worldwide, many nuclear power plants will be reaching the end of their lifetimes over the next few years. States must therefore decide now on the direction they intend to steer their energy policies. Possible options are the construction of new nuclear power plants, extending the lifetime of existing ones, or changing direction towards a sustainable energy future. Arguments put forward by the nuclear power lobby in favour of new builds are, on the one hand, the claim that nuclear power is low in CO2 emissions,1and on the other, that it is low cost. This paper examines the second claim and identifies the “true costs of nuclear power”. This paper provides an overview for the general reader and presents the most important aspects of “costs of nuclear power”, as well as sound information to contribute to discussions of this complex issue. The first part of this paper focuses on the costs of nuclear new-build: Approximately two thirds of electricity generation costs consist of fixed costs, the largest part of which covers the construction of the nuclear power plant (NPP) itself, including the interest rates (capital costs). Consequently, construction costs are a crucial factor in the overall cost of nuclear power. The issue of nuclear new build is currently under discussion in many states in Europe which are considering replacing their aged nuclear power plant fleet, e.g. UK (Hinkley Point and further plans for new builds), Finland (Olkiluoto 3), France (Flamanville 3), the Czech Republic (Temelin 3/4), Slovakia (Mochovce 3/4) and Romania (Cernavoda 3/4). Those projects have one crucial point in common: problems with costs or financing. The Massachusetts Institute of Technology (MIT) has calculated that construction costs rose 15% per annum from 2003 to 2009; construction costs rose from 2,000 to 4,000 USD, amounting to total construction costs of US$ 4 billion for a 1,000 MW NPP. A current example of cost and construction time overrun is the Finnish reactor

  19. Assessment of financial expenditure for Rivne NPP power units decommissioning

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Salij, L.M.

    2007-01-01

    The article covers some financial aspects of developing a decommissioning concept for Rivne NPP power units with reactor VVER-440 and VVER-1000. Possible methodological approaches to costs estimate have been analyzed. Preliminary results of cost estimation are presented for two decommissioning options: deferred and immediate dismantling. Principally possible options for accumulating assets have been analyzed to finance measures related to Rivne NPP decommissioning. A mathematical model has been proposed for creating decommissioning financial reserve

  20. Trends in nuclear power costs in Sweden

    International Nuclear Information System (INIS)

    Vesterhaugh, O.; Blomsnes, B.

    1979-01-01

    At the request of the Swedish Ministry of Industry, a study of the costs of nuclear power in Sweden was performed early this year. The main purpose of the study was to determine the real and projected costs of electricity produced by nuclear stations. The basis for the calculations of the study was the currently planned Swedish nuclear power programme consisting of 11 reactors of which six are operating, two waiting for start-up permission and the remainder are under construction. All cost components, relevant to the commercial programme were covered, with particular emphasis on future costs for handling of spent fuel, waste disposal and plant decommissioning. A capital depreciation time of 25 years and a 4 per cent effective annual interest rate (ie interest after correction for inflation) were assumed in the calculations given in December 1978 currency. The main result of the study is the average cost per kWh for the reactors. The results are in close agreement with the cost estimate given by the Swedish Energy Commission and now that the nuclear plants produce electricity considerably cheaper than other plants with the exception of some hydroelectric ones. (author)

  1. Solar power. [comparison of costs to wind, nuclear, coal, oil and gas

    Science.gov (United States)

    Walton, A. L.; Hall, Darwin C.

    1990-01-01

    This paper describes categories of solar technologies and identifies those that are economic. It compares the private costs of power from solar, wind, nuclear, coal, oil, and gas generators. In the southern United States, the private costs of building and generating electricity from new solar and wind power plants are less than the private cost of electricity from a new nuclear power plant. Solar power is more valuable than nuclear power since all solar power is available during peak and midpeak periods. Half of the power from nuclear generators is off-peak power and therefore is less valuable. Reliability is important in determining the value of wind and nuclear power. Damage from air pollution, when factored into the cost of power from fossil fuels, alters the cost comparison in favor of solar and wind power. Some policies are more effective at encouraging alternative energy technologies that pollute less and improve national security.

  2. Operational costs induced by fluctuating wind power production in Germany and Scandinavia

    DEFF Research Database (Denmark)

    Meibom, Peter; Weber, C.; Barth, R.

    2009-01-01

    Adding wind power generation in a power system changes the operational patterns of the existing units due to the variability and partial predictability of wind power production. For large amounts of wind power production, the expectation is that the specific operational costs (fuel costs, start......-up costs, variable operation and maintenance costs, costs of consuming CO2 emission permits) of the other power plants will increase due to more operation time in part-load and more start-ups. The change in operational costs induced by the wind power production can only be calculated by comparing...... the operational costs in two power system configurations: with wind power production and with alternative wind production having properties such as conventional production, that is, being predictable and less variable. The choice of the characteristics of the alternative production is not straightforward...

  3. Synthesis on construction unit cost development : technical report.

    Science.gov (United States)

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  4. PowerFilm PowerShade Fixed Site Solar System Cost Reduction Plan

    Science.gov (United States)

    2014-07-31

    system was designed which adds capability of grid tie connection to the standalone function. This battery operating system has built-in intelligence...goal concerning alternative conductive grid inks was to reduce the cost of the silver ink layer without a reduction in PV power with experimentation... system . To overcome this loss, a new BOS unit with higher power transfer efficiency has been developed. This system also has grid tie

  5. Low-cost solar electric power

    CERN Document Server

    Fraas, Lewis M

    2014-01-01

    ?This book describes recent breakthroughs that promise major cost reductions in solar energy production in a clear and highly accessible manner. The author addresses the three key areas that have commonly resulted in criticism of solar energy in the past: cost, availability, and variability. Coverage includes cutting-edge information on recently developed 40? efficient solar cells, which can produce double the power of currently available commercial cells. The discussion also highlights the potentially transformative emergence of opportunities for integration of solar energy storage and natura

  6. Virginia Power's vision of lower costs

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The top two positions in the 1996 annual league table of US nuclear production costs were taken by Surry at $11.45/MWh generated and North Anna at $12.64. Both are PWR plants operated by Virginia Power. This is part of a consistent pattern of good performance in recent years. In the late 1980s, however, the performance of these plants was very poor. The management changes which have brought about the transformation are examined. They include: setting goals; better teamwork; increased accountability of senior management for budgets; development and monitoring of performance indicators; running the nuclear division as a separate business; more effective maintenance and reduced outage costs. (UK)

  7. US nuclear power plant operating cost and experience summaries

    International Nuclear Information System (INIS)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov)

  8. US nuclear power plant operating cost and experience summaries

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  9. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  10. Decommissioning nuclear power plants. Policies, strategies and costs

    International Nuclear Information System (INIS)

    2003-01-01

    The decommissioning of nuclear power plants is a topic of increasing interest to governments and the industry as many nuclear units approach retirement. It is important in this context to assess decommissioning costs and to ensure that adequate funds are set aside to meet future financial liabilities arising after nuclear power plants are shut down. Furthermore, understanding how national policies and industrial strategies affect those costs is essential for ensuring the overall economic effectiveness of the nuclear energy sector. This report, based upon data provided by 26 countries and analysed by government and industry experts, covers a variety of reactor types and sizes. The findings on decommissioning cost elements and driving factors in their variance will be of interest to analysts and policy makers in the nuclear energy field. (author)

  11. Low Cost, Low Power, High Sensitivity Magnetometer

    Science.gov (United States)

    2008-12-01

    which are used to measure the small magnetic signals from brain. Other types of vector magnetometers are fluxgate , coil based, and magnetoresistance...concentrator with the magnetometer currently used in Army multimodal sensor systems, the Brown fluxgate . One sees the MEMS fluxgate magnetometer is...Guedes, A.; et al., 2008: Hybrid - LOW COST, LOW POWER, HIGH SENSITIVITY MAGNETOMETER A.S. Edelstein*, James E. Burnette, Greg A. Fischer, M.G

  12. Analysis of nuclear-power construction costs

    International Nuclear Information System (INIS)

    Jansma, G.L.; Borcherding, J.D.

    1988-01-01

    This paper discusses the use of regression analysis for estimating construction costs. The estimate is based on an historical data base and quantification of key factors considered external to project management. This technique is not intended as a replacement for detailed cost estimates but can provide information useful to the cost-estimating process and to top management interested in evaluating project management. The focus of this paper is the nuclear-power construction industry but the technique is applicable beyond this example. The approach and critical assumptions are also useful in a public-policy situation where utility commissions are evaluating construction in prudence reviews and making comparisons to other nuclear projects. 13 references, 2 figures

  13. Insurance cost of Swedish nuclear power plants

    International Nuclear Information System (INIS)

    Kaellstrand, Aasa.

    1992-01-01

    What happens if a reactor accident occurs? Can victims of a nuclear accident be compensated for losses? The rights of a victim of a nuclear accident to be compensated for losses are governed by international conventions. These conventions make the licensee of a nuclear plant strictly liable. However, the maximum amount of compensation is limited. In Sweden the total liability of the plant-owner is maximized to 1.2 million Swedish Crowns, that is 0.02 oere/kWh. After the accidents of Harrisburg (1979) and Chernobyl (1986), it has become clear that the amounts of the various conventions are not at all sufficient to cover the damages caused by such an accident. In spite of these facts, there are a large number of reliable sources, who think that the insurance costs are negligible in the cost of production. A cost-benefit analysis based on a study performed by Ottinger et al. in 'Environmental costs of electricity' is therefore adopted to derive the costs of the external effects of nuclear plant operation and from releases to the environment during operation. The environmental externality costs of Swedish nuclear power plant operations are in this report estimated to 18.3 oere/kWh. This figure can be compared to the insurance cost, which for the present is 0.02 oere/kWh. The 'real' insurance cost including the external effects is calculated to approximately 1.12 billion Swedish Crowns] That is 900 times larger than the insurance premium, which the licensee of a nuclear plant faces] (au)

  14. Calculating the Unit Cost Factors for Decommissioning Cost Estimation of the Nuclear Research Reactor

    International Nuclear Information System (INIS)

    Jeong, Kwan Seong; Lee, Dong Gyu; Jung, Chong Hun; Lee, Kune Woo

    2006-01-01

    The estimated decommissioning cost of nuclear research reactor is calculated by applying a unit cost factor-based engineering cost calculation method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning cost of nuclear research reactor is composed of labor cost, equipment and materials cost. Labor cost of decommissioning costs in decommissioning works are calculated on the basis of working time consumed in decommissioning objects. In this paper, the unit cost factors and work difficulty factors which are needed to calculate the labor cost in estimating decommissioning cost of nuclear research reactor are derived and figured out.

  15. Solar power water distillation unit

    International Nuclear Information System (INIS)

    Hameed, Kamran; Khan, Muhammad Muzammil; Ateeq, Ijlal Shahrukh; Omair, Syed Muhammad; Ahmer, Muhammad; Wajid, Abdul

    2013-01-01

    Clean drinking water is the basic necessity for every human being, but about 1.1 billion people in the world lacked proper drinking water. There are many different types of water purification processes such as filtration, reverse osmosis, ultraviolet radiation, carbon absorption, but the most reliable processes are distillation and boiling. Water purification, such as distillation, is especially important in regions where water resources or tap water is not suitable for ingesting without boiling or chemical treatment. In design project It treats the water by combining different methods such as Filtration, Distillation and a technique called concentrated solar power (CSP). Distillation is literally the method seen in nature, whereby: the sun heats the water on the earth's surface, the water is turned into a vapor (evaporation) and rises, leaving contaminants behind, to form clouds. As the upper atmosphere drops in temperature the vapors cool and convert back to water to form water. In this project distillation is achieved by using a parabolic mirror which boils water at high temperature. Filtration is done by sand filter and carbon filter. First sand filter catches the sand particles and the carbon filter which has granules of active carbon is used to remove odor dissolved gases from water. This is the Pre-treatment of water. The filtered water is then collected in a water container at a focus of parabolic mirror where distillation process is done. Another important feature of designed project is the solar tracking of a parabolic mirror which increases the efficiency of a parabolic mirror [1],[2].

  16. Technology and costs for dismantling a Swedish nuclear power plant

    International Nuclear Information System (INIS)

    1979-10-01

    Various estimates concerning the costs of decommissioning a redundant nuclear power reactor to the green fields state are given in the literature. The purpose of this study is to provide background material for the Swedish nuclear power utilities to estimate the costs and time required to dismantle an ASEA-ATOM Boiling Water Reactor. The units Oskarshamn II and Barsebeck 1, both with an installed capacity of approximately 600 MW, serve as reference plants. The time of operation before final shutdown is assumed to be 40 years. Dismantling operations are initiated one year after shutdown. When the dismantling of the plant is finished, the site is to be released for unrestricted use. The costs for dismantling and subsequent final disposal of the radioactive waste are estimated at approximately SEK 500 million (approximately US dollars 120 million) in terms of 1979 prices. The sum includes 25% contingency. The dismantling cost is equivalent to 10-15% of the installation cost of an equivalent new nuclear power plant. The exact percentage is dependent on the interest rate during the construction period. It is shown in the study that a total dismantling can be accomplished in less than five years. This report is a compilation of studies performed by ASEA-ATOM and VBB based on premises given by KBS. The reports from these studies are presented in appendices. (Auth.)

  17. Manual for Reducing Educational Unit Costs in Latin American Countries.

    Science.gov (United States)

    Centro Multinacional de Investigacion Educativa, San Jose (Costa Rica).

    Designed for educational administrators, this manual provides suggestions for reducing educational unit costs in Latin America without reducing the quality of the education. Chapter one defines unit cost concepts and compares the costs of the Latin American countries. Chapter two deals with the different policies which could affect the principal…

  18. Fusion reactor design studies: standard unit costs and cost scaling rules

    International Nuclear Information System (INIS)

    Schulte, S.C.; Bickford, W.E.; Willingham, C.E.; Ghose, S.K.; Walker, M.G.

    1979-09-01

    This report establishes standard unit costs and scaling rules for estimating costs of material, equipment, land, and labor components used in magnetic confinement fusion reactor plant construction and operation. Use of the standard unit costs and scaling rules will add uniformity to cost estimates, and thus allow valid comparison of the economic characteristics of various reactor concepts

  19. Operational costs induced by fluctuating wind power production in Germany and Scandinavia

    Energy Technology Data Exchange (ETDEWEB)

    Meibom, P. [Risoe National Lab., DTU, System Analysis Dept., Roskilde (Denmark); Weber, C. [Univ. Duisburg-Essen, Chai og Energy Management (Germany); Barth, R.; Brand, H. [Univ. of Stuttgart, Inst. of Energy Economics and the Rational Use of Energy (Germany)

    2007-05-15

    Adding wind power generation in a power system changes the operational patterns of the existing units due to the variability and unpredictability of wind power production. For large amounts of wind power production the expectation is that the operational costs of the other power plants will increase due to more operation time in part-load and more start-ups. The change in operational costs induced by the wind power production can only be calculated by comparing the operational costs in two power system configurations: with wind power production and with alternative production having properties like conventional production, i.e. being predictable and less variable. The choice of the characteristics of the alternative production is not straight forward and will therefore influence the operational costs induced by wind power production. This paper presents a method for calculating the change in operational costs due to wind power production using a stochastic optimization model covering the power systems in Germany and the Nordic countries. Two cases of alternative production are used to calculate the change in operational costs namely perfectly predictable wind power production enabling calculation of the costs connected to unpredictability, and constant wind power production enabling calculation of the operational costs connected to variability of wind power production. A 2010 case with three different wind power production penetration levels is analysed in the paper. (au)

  20. Estimation of small-scale hydroelectric power plant costs

    International Nuclear Information System (INIS)

    Santos, Afonso Henriques Moreira; Silva, Benedito Claudio da; Magalhaes, Ricardo Nogueira

    2010-01-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  1. Wind power: cost effective generation for the 1990s

    Energy Technology Data Exchange (ETDEWEB)

    Pedersen, T [Vestas Wind Systems A/S (Denmark)

    1989-01-01

    Wind power plants have been installed all over the world, notably in California and Denmark. Commercially available wind turbines today are rated from 50 KW to 1 MW with emphasis on the 1 MW range. As the fuel is ''free'' generating costs are identical to the capital, operation and maintenance costs of the plant. An estimate of the unit price of wind power generated electricity in Denmark is comparable to that generated by a coal fired plant. The main environmental impacts of a wind farm are considered. These are visual impact, noise emission, use of (agricultural) space and the impact on wildlife, mainly birds. Finally the installation of a wind farm and its connection to the grid are described. (3 figures, 1 table). (UK)

  2. Analisis Unit Cost Sectio Caesaria dengan Metode Activity Based Costing di Rumah Sakit Bhayangkara Yogyakarta

    Directory of Open Access Journals (Sweden)

    Tsalisah Damayanti

    2017-01-01

    Full Text Available This study aims to analyze the unit cost of sectio Caesaria by ABC method, second to analyze the differences between the unit cost calculation of Sectio Caesaria by ABC method with applied cost. Unit cost analysis was conducted at Sectio Caesaria procedure without comorbidities or complications. Data that used in the form of primary data interviews with specialists Obgyn and secondary data financial data and hospitals profiles. The result of the calculation of unit cost of Sectio Caesaria service through Activity Based Costing approach is still lower than INA CBG’s tariff.

  3. Unit costs of waste management operations

    International Nuclear Information System (INIS)

    Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

    1994-04-01

    This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ''cradle to grave'') cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics

  4. User's manual for levelized power generation cost using a microcomputer

    International Nuclear Information System (INIS)

    Fuller, L.C.

    1984-08-01

    Microcomputer programs for the estimation of levelized electrical power generation costs are described. Procedures for light-water reactor plants and coal-fired plants include capital investment cost, operation and maintenance cost, fuel cycle cost, nuclear decommissioning cost, and levelized total generation cost. Programs are written in Pascal and are run on an Apple II Plus microcomputer

  5. Forecasting Canadian nuclear power station construction costs

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequences of the decision as possible. This understanding must be provided by the evaluation of future situations. A key consideration in an evaluation is the financial component. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A brief review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A database is built and indexes are prepared. Based on these indexes, an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of 40 years are generated and applications (such as alternative scenario forecasts and range forecasts) to uncertainty assessment and/or decision-making are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the first for Canadian NGS constructions. (author)

  6. Teachers Environmental Resource Unit: Energy and Power.

    Science.gov (United States)

    Bemiss, Clair W.

    Problems associated with energy production and power are studied in this teacher's guide to better understand the impact of man's energy production on the environment, how he consumes energy, and in what quantities. The resource unit is intended to provide the teacher with basic information that will aid classroom review of these problems. Topics…

  7. The 3rd power unit roofing decontamination

    International Nuclear Information System (INIS)

    Samojlenko, Yu.N.; Golubev, V.V.

    1989-01-01

    The most features of the 3rd power unit (PU) roofing decontamination are described: 1) the most active materials were thrown into the 4th PU ruins before the Ukrytie construction completion; 2) the decontamination was fulfilled using remote-controlled mechanisms and manual devices (the main part). 6 figs.; 1 tab

  8. Power plant cost estimates put to the test

    International Nuclear Information System (INIS)

    Crowley, J.H.

    1978-01-01

    The growth in standards for nuclear applications and the impact of these codes and standards on the cost of nuclear power plants is described. The preparation of cost estimates and reasons for apparent discrepancies are discussed. Consistent estimates of nuclear power plant costs have been prepared in the USA for over a decade. They show that the difference in capital costs between nuclear and coal fired plants is narrowing and that when total generating costs are calculated nuclear power is substantially cheaper. (UK)

  9. Comparative Life-Cycle Cost Analysis Of Solar Photovoltaic Power ...

    African Journals Online (AJOL)

    Comparative Life-Cycle Cost Analysis Of Solar Photovoltaic Power System And Diesel Generator System For Remote Residential Application In Nigeria. ... like capital cost, and diesel fuel costs are varied. The results show the photovoltaic system to be more cost-effective at low-power ranges of electrical energy supply.

  10. 7 CFR 1710.303 - Power cost studies-power supply borrowers.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Power cost studies-power supply borrowers. 1710.303... AND GUARANTEES Long-Range Financial Forecasts § 1710.303 Power cost studies—power supply borrowers. (a... facilities shall be supported by a power cost study to demonstrate that the proposed generation and...

  11. Control units for APS power supplies

    International Nuclear Information System (INIS)

    Despe, O.D.; Saunders, C.; McGhee, D.G.

    1993-01-01

    The Advanced Photon Source (APS) accelerator facility is made up of five major subsystems in addition to the linac: the positron accumulator ring (PAR), low energy transport (LET), booster synchrotron (SYNCH), high energy transport (HET), the storage ring (SR). Each subsystem has multiple magnet power supply combinations, some requiring multiple of operation. These magnet and power supply combinations computer controlled and monitored. The power supply control unit (PSCU) is the first layer of hardware and software above the power supply itself and is described in this paper. The description includes the basic philosophy for each of operation and how it influences the topology and of implementing control. The design of the analog reference blocks (ARBs) influenced the design of other custom functions well as the feedback controls for vibration and other dynamic corrections. The command set supported by the PSCU is discussed

  12. Danish wind power export and cost

    Energy Technology Data Exchange (ETDEWEB)

    Lund, H.; Hvelplund, F.; Alberg OEstergaard, P. (and others)

    2010-02-15

    In a normal wind year, Danish wind turbines generate the equivalent of approx. 20 percent of the Danish electricity demand. This paper argues that only approx. 1 percent of the wind power production is exported. The rest is used to meet domestic Danish electricity demands. The cost of wind power is paid solely by the electricity consumers and the net influence on consumer prices was as low as 1-3 percent on average in the period 2004-2008. In 2008, the net influence even decreased the average consumer price, although only slightly. In Denmark, 20 percent wind power is integrated by using both local resources and international market mechanisms. This is done in a way which makes it possible for our neighbouring countries to follow a similar path. Moreover, Denmark has a strategy to raise this share to 50 percent and the necessary measures are in the process of being implemented. Recently, a study made by the Danish think tank CEPOS claimed the opposite, i.e. that most of the Danish wind power has been exported in recent years. However, this claim is based on an incorrect interpretation of statistics and a lack of understanding of how the international electricity markets operate. Consequently, the results of the CEPOS study are in general not correct. Moreover, the CEPOS study claims that using wind turbines in Denmark is a very expensive way of reducing CO{sub 2} emissions and that this is the reason for the high energy taxes for private consumers in Denmark. These claims are also misleading. The cost of CO{sub 2} reduction by use of wind power in the period 2004-2008 was only 20 EUR/ton. Furthermore, the Danish wind turbines are not paid for by energy taxes. Danish wind turbines are given a subsidy via the electricity price which is paid by the electricity consumers. In the recent years of 2004-2008, such subsidy has increased consumer prices by 0.54 EURO/kWh on average. On the other hand, however, the same electricity consumers also benefitted from the wind

  13. Evaluation of the performance of combined cooling, heating, and power systems with dual power generation units

    International Nuclear Information System (INIS)

    Knizley, Alta A.; Mago, Pedro J.; Smith, Amanda D.

    2014-01-01

    The benefits of using a combined cooling, heating, and power system with dual power generation units (D-CCHP) is examined in nine different U.S. locations. One power generation unit (PGU) is operated at base load while the other is operated following the electric load. The waste heat from both PGUs is used for heating and for cooling via an absorption chiller. The D-CCHP configuration is studied for a restaurant benchmark building, and its performance is quantified in terms of operational cost, primary energy consumption (PEC), and carbon dioxide emissions (CDE). Cost spark spread, PEC spark spread, and CDE spark spread are examined as performance indicators for the D-CCHP system. D-CCHP system performance correlates well with spark spreads, with higher spark spreads signifying greater savings through implementation of a D-CCHP system. A new parameter, thermal difference, is introduced to investigate the relative performance of a D-CCHP system compared to a dual PGU combined heat and power system (D-CHP). Thermal difference, together with spark spread, can explain the variation in savings of a D-CCHP system over a D-CHP system for each location. The effect of carbon credits on operational cost savings with respect to the reference case is shown for selected locations. - Highlights: • We investigate benefits from using combined cooling, heating, and power systems. • A dual power generation unit configuration is considered for CCHP and CHP. • Spark spreads for cost, energy, and emissions correlate with potential savings. • Thermal difference parameter helps to explain variations in potential savings. • Carbon credits may increase cost savings where emissions savings are possible

  14. A flowsheet for a wave power unit

    Energy Technology Data Exchange (ETDEWEB)

    Sobierajski, E.; Kasperowicz, Z.

    1984-01-01

    A flowsheet is examined for a wave power unit designed to produce electricity, for flooding or drying a coastal zone, cleaning or protecting water areas of ports from sand deposits. The unit includes a vertical cylinder attached to the sea floor with input and output water ducts and valves. The cylinder has a rod with piston that is actuated through a flexible cable by float arranged next to the cylinder. The water injected under pressure into the pressure pipe can be used directly or as an intermediate energy source.

  15. 48 CFR 1845.7101-3 - Unit acquisition cost.

    Science.gov (United States)

    2010-10-01

    ... production inventory and include programmed extra units to cover replacement during the fabrication process... ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Forms Preparation 1845.7101-3 Unit acquisition cost. (a... production costs (for assets produced or constructed). (5) Engineering, architectural, and other outside...

  16. Hidden power system inflexibilities imposed by traditional unit commitment formulations

    International Nuclear Information System (INIS)

    Morales-España, Germán; Ramírez-Elizondo, Laura; Hobbs, Benjamin F.

    2017-01-01

    Highlights: • Quality and accuracy of traditional-energy- and power-based UCs are evaluated. • Real-time performance evaluation simulating “perfect” stochastic UCs. • Ideal energy-based stochastic UC formulations impose hidden system inflexibilities. • A deterministic power-based UC may outperform an ideal energy-based stochastic UC. • Power-based UC overcomes flaws of energy-based UC: lower cost and wind curtailment. - Abstract: Approximations made in traditional day-ahead unit commitment model formulations can result in suboptimal or even infeasible schedules for slow-start units and inaccurate predictions of actual costs and wind curtailment. With increasing wind penetration, these errors will become economically more significant. Here, we consider inaccuracies from three approximations: the use of hourly intervals in which energy production from each generator is modeled as being constant; the disregarding of startup and shutdown energy trajectories; and optimization based on expected wind profiles. The results of unit commitment formulations with those assumptions are compared to models that: (1) use a piecewise-linear power profiles of generation, load and wind, instead of the traditional stepwise energy profiles; (2) consider startup/shutdown trajectories; and (3) include many possible wind trajectories in a stochastic framework. The day-ahead hourly schedules of slow-start generators are then evaluated against actual wind and load profiles using a model real-time dispatch and quick-start unit commitment with a 5 min time step. We find that each simplification usually causes expected generation costs to increase by several percentage points, and results in significant understatement of expected wind curtailment and, in some cases, load interruptions. The inclusion of startup and shutdown trajectories often yielded the largest improvements in schedule performance.

  17. Optimizing power plant cycling operations while reducing generating plant damage and costs

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S.A.; Besuner, P.H.; Grimsrud, P. [Aptech Engineering Services, Inc., Sunnyvale, CA (United States); Bissel, A. [Electric Supply Board, Dublin (Ireland)

    1998-12-31

    This presentation describes a method for analyzing, quantifying, and minimizing the total cost of fossil, combined cycle, and pumped hydro power plant cycling operation. The method has been developed, refined, and applied during engineering studies at some 160 units in the United States and 8 units at the Irish Electric Supply Board (ESB) generating system. The basic premise of these studies was that utilities are underestimating the cost of cycling operation. The studies showed that the cost of cycling conventional boiler/turbine fossil power plants can range from between $2,500 and $500,000 per start-stop cycle. It was found that utilities typically estimate these costs by factors of 3 to 30 below actual costs and, thus, often significantly underestimate their true cycling costs. Knowledge of the actual, or total, cost of cycling will reduce power production costs by enabling utilities to more accurately dispatch their units to manage unit life expectancies, maintenance strategies and reliability. Utility management responses to these costs are presented and utility cost savings have been demonstrated. (orig.) 7 refs.

  18. Optimizing power plant cycling operations while reducing generating plant damage and costs

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S A; Besuner, P H; Grimsrud, P [Aptech Engineering Services, Inc., Sunnyvale, CA (United States); Bissel, A [Electric Supply Board, Dublin (Ireland)

    1999-12-31

    This presentation describes a method for analyzing, quantifying, and minimizing the total cost of fossil, combined cycle, and pumped hydro power plant cycling operation. The method has been developed, refined, and applied during engineering studies at some 160 units in the United States and 8 units at the Irish Electric Supply Board (ESB) generating system. The basic premise of these studies was that utilities are underestimating the cost of cycling operation. The studies showed that the cost of cycling conventional boiler/turbine fossil power plants can range from between $2,500 and $500,000 per start-stop cycle. It was found that utilities typically estimate these costs by factors of 3 to 30 below actual costs and, thus, often significantly underestimate their true cycling costs. Knowledge of the actual, or total, cost of cycling will reduce power production costs by enabling utilities to more accurately dispatch their units to manage unit life expectancies, maintenance strategies and reliability. Utility management responses to these costs are presented and utility cost savings have been demonstrated. (orig.) 7 refs.

  19. Geothermal electric power generation in Iceland for the proposed Iceland/United Kingdom HVDC power link

    International Nuclear Information System (INIS)

    Hammons, T.J.; Palmason, G.; Thorhallsson, S.

    1991-01-01

    The paper reviews geothermal electric power potential in Iceland which could economically be developed to supplement hydro power for the proposed HVDC Power Link to the United Kingdom, and power intensive industries in Iceland, which are envisaged for development at this time. Technically harnessable energy for electricity generation taking account of geothermal resources down to an assumed base depth, temperature distribution in the crust, probable geothermal recovery factor, and accessibility of the field, has been assessed. Nineteen known high-temperature fields and 9 probable fields have been identified. Technically harnessable geo-heat for various areas is indicated. Data on high temperature fields suitable for geothermal electric power generation, and on harnessable energy for electric power generation within volcanic zones, is stated, and overall assessments are made. The paper then reviews how the potential might be developed, discussing preference of possible sites, and cost of the developments at todays prices. Cost of geothermal electric power generation with comparative costs for hydro generation are given. Possible transmission system developments to feed the power to the proposed HVDC Link converter stations are also discussed

  20. COST BUDGETING WITH THE ROMANIAN BAKERY UNITS

    Directory of Open Access Journals (Sweden)

    RĂSCOLEAN ILIE

    2017-11-01

    Full Text Available A primary objective of management accounting is the possibility to estimate the total costs of a product or service works, which determines the development and implementation of specific managerial accounting systems that in addition to quantifying the immediate results aimed at achieving objectives such as customer orientation, labor productivity growth, the improvement of economic entities’ performance, establishing optimal outlets and prices and abandoning production-manufacture products that generate losses. Based on the progress of the investigations undertaken in the literature, the authors article demonstrates the need for achieving cost budgeting in the context of economic entities from the milling and bakeries industry, as mean of management control - by the example of S.C. AVANTI SRL Lupeni. The research in the field has led to the conduct of the study are awaited, being capable of demonstrating the viability of the management accounting organization at economic entities in the milling and bakery industry from Romania, in order to increase their performances. The results obtained by applying the costs budgeting allowed a rigorous cost control, which ultimately leads to an increase in the performance of the economic entity under study, as well as to the economic entities in the field that will apply the costs budgeting. At the end, the authors conclude regarding the importance of extending the framework for successfully implementing cost budgeting in the context of economic entities across the country.

  1. Cost analysis of small hydroelectric power plants components and preliminary estimation of global cost

    International Nuclear Information System (INIS)

    Basta, C.; Olive, W.J.; Antunes, J.S.

    1990-01-01

    An analysis of cost for each components of Small Hydroelectric Power Plant, taking into account the real costs of these projects is shown. It also presents a global equation which allows a preliminary estimation of cost for each construction. (author)

  2. The costs of producing a unit of blood in Zimbabwe

    NARCIS (Netherlands)

    Mafirakureva, Nyashadzaishe; Nyoni, Herbert; Nkomo, Sisodwa Z; Jacob, Jeffery S; Chikwereti, Radhi; Musekiwa, Zamile; Khoza, Star; Mvere, David A; Emmanuel, Jean C; Postma, Maarten J; van Hulst, Marinus

    2015-01-01

    BACKGROUND: There is lack of published data on the costs of blood and blood transfusion in sub-Saharan Africa. This study aimed to assess the unit costs of producing blood in Zimbabwe using an activity-based costing (ABC) method. STUDY DESIGN AND METHODS: A management accounting approach, based on

  3. Application of the Activity-Based Costing Method for Unit-Cost Calculation in a Hospital

    Science.gov (United States)

    Javid, Mahdi; Hadian, Mohammad; Ghaderi, Hossein; Ghaffari, Shahram; Salehi, Masoud

    2016-01-01

    Background: Choosing an appropriate accounting system for hospital has always been a challenge for hospital managers. Traditional cost system (TCS) causes cost distortions in hospital. Activity-based costing (ABC) method is a new and more effective cost system. Objective: This study aimed to compare ABC with TCS method in calculating the unit cost of medical services and to assess its applicability in Kashani Hospital, Shahrekord City, Iran. Methods: This cross-sectional study was performed on accounting data of Kashani Hospital in 2013. Data on accounting reports of 2012 and other relevant sources at the end of 2012 were included. To apply ABC method, the hospital was divided into several cost centers and five cost categories were defined: wage, equipment, space, material, and overhead costs. Then activity centers were defined. ABC method was performed into two phases. First, the total costs of cost centers were assigned to activities by using related cost factors. Then the costs of activities were divided to cost objects by using cost drivers. After determining the cost of objects, the cost price of medical services was calculated and compared with those obtained from TCS. Results: The Kashani Hospital had 81 physicians, 306 nurses, and 328 beds with the mean occupancy rate of 67.4% during 2012. Unit cost of medical services, cost price of occupancy bed per day, and cost per outpatient service were calculated. The total unit costs by ABC and TCS were respectively 187.95 and 137.70 USD, showing 50.34 USD more unit cost by ABC method. ABC method represented more accurate information on the major cost components. Conclusion: By utilizing ABC, hospital managers have a valuable accounting system that provides a true insight into the organizational costs of their department. PMID:26234974

  4. Application of the Activity-Based Costing Method for Unit-Cost Calculation in a Hospital.

    Science.gov (United States)

    Javid, Mahdi; Hadian, Mohammad; Ghaderi, Hossein; Ghaffari, Shahram; Salehi, Masoud

    2015-05-17

    Choosing an appropriate accounting system for hospital has always been a challenge for hospital managers. Traditional cost system (TCS) causes cost distortions in hospital. Activity-based costing (ABC) method is a new and more effective cost system. This study aimed to compare ABC with TCS method in calculating the unit cost of medical services and to assess its applicability in Kashani Hospital, Shahrekord City, Iran.‎ This cross-sectional study was performed on accounting data of Kashani Hospital in 2013. Data on accounting reports of 2012 and other relevant sources at the end of 2012 were included. To apply ABC method, the hospital was divided into several cost centers and five cost categories were defined: wage, equipment, space, material, and overhead costs. Then activity centers were defined. ABC method was performed into two phases. First, the total costs of cost centers were assigned to activities by using related cost factors. Then the costs of activities were divided to cost objects by using cost drivers. After determining the cost of objects, the cost price of medical services was calculated and compared with those obtained from TCS.‎ The Kashani Hospital had 81 physicians, 306 nurses, and 328 beds with the mean occupancy rate of 67.4% during 2012. Unit cost of medical services, cost price of occupancy bed per day, and cost per outpatient service were calculated. The total unit costs by ABC and TCS were respectively 187.95 and 137.70 USD, showing 50.34 USD more unit cost by ABC method. ABC method represented more accurate information on the major cost components. By utilizing ABC, hospital managers have a valuable accounting system that provides a true insight into the organizational costs of their department.

  5. Power plant economy of scale and cost trends: further analyses and review of empirical studies

    International Nuclear Information System (INIS)

    Fisher, C.F. Jr.; Paik, S.; Schriver, W.R.

    1986-07-01

    Multiple regression analyses were performed on capital cost data for nuclear and coal-fired power plants in an extension of an earlier study which indicated that nuclear units completed prior to the accident at Three-Mile Island (TMI) have no economy of scale, and that units completed after that event have a weak economy of scale (scaling exponent of about 0.81). The earlier study also indicated that the scaling exponent for coal-fired units is about 0.92, compared with conceptual models which project scaling exponents in a range from about 0.5 to 0.9. Other empirical studies have indicated poor economy of scale, but a large range of cost-size scaling exponents has been reported. In the present study, the results for nuclear units indicate a scaling exponent of about 0.94 but with no economy of scale for large units, that a first unit costs 17% more than a second unit, that a unit in the South costs 20% less than others, that a unit completed after TMI costs 33% more than one completed before TMI, and that costs are increasing at 9.3% per year. In the present study, the results for coal-fired units indicate a scaling exponent of 0.93 but with better scaling economy in the larger units, that a first unit costs 38.5% more, a unit in the South costs 10% less, flue-gas desulfurization units cost 23% more, and that costs are increasing at 4% per year

  6. Current production costs in various power plant systems

    Energy Technology Data Exchange (ETDEWEB)

    Weible, H.

    1977-01-01

    The costs of producing electric power were evaluated for flowing water power plants, storage and pumped storage power plants, bituminous coal power plants, heating oil power plants (fired with heavy heating oil), natural gas-fired power plants, gas turbines, pressurized water reactors, and boiling water reactors. The calculational methods used for evaluating costs and the input data for methods used for the KOSKON and KOSKERN computer programs are described. It is emphasized that the calculations are examples to indicate the possible effects of the cost program and are only as valid as the input data. (JSR)

  7. Allocating nuclear power plant costs over time

    International Nuclear Information System (INIS)

    Nellis, R.E.

    1983-01-01

    The nuclear generating plants coming into service in the 1980s have book values amounting to several billion dollars, doubling the rate bases of the owner utilities in some instances. The impact that this is producing on electric rates is of concern to consumers, regulators, and utilities alike. A review of the basic nature of a productive asset, the purpose of depreciation accounting, and the composition of interest rates leads to a method of constructing capital-recovery schedules which has come to be termed economic depreciation. This methodology departs from conventional methodology only in that it accepts inflation as a fact of life. This article indicates that application of the procedure to an actual nuclear reactor provides benefits for all classes of ratepayers in that initial capital-recovery costs to ratepayers are substantially lower and, in terms of dollars of constant purchasing power, the total amount paid by customers for return on investment is substantially the same. For the utility, whereas initial capital recovery is lower, total capital recovery is somewhat greater, and the utility is no worse off if it must raise some working capital in the capital markets. 6 references, 4 figures, 2 tables

  8. Revitalization of Tuzla Thermal Power Plant's Unit 3 (100 MW)

    International Nuclear Information System (INIS)

    Sakovic, A.; Praso, N.

    1998-01-01

    Power Plant Revitalization is a highly ranged concept essentially aimed at continued operations of the generating unit at, or near, rated capacities for the rest of the economic life of the plant or even for an extended life. In essence, the need to rehabilitate may arise due to reasons such as low availability factor, low efficiency, increasing operating and maintenance costs, loss of reliability, drop in safety of plant and personnel, poor maintainability or environmental requirements. The term revitalization is therefore normally used in the context to cover the range of activities including repairing components, replacing equipment, modifying systems, adding new system and equipment and perhaps restoration to rated capacities. This exercise on already complex power generation process will naturally require the application of various technologies in order to ensure a safe and efficient installation of electricity supply. In normal conditions of producing and consumption of electricity (load demands) in order to answer the question of what kind of revitalization to undertake it is necessary to state at the very beginning: - whether it is necessary, from the point of equipment wear-out, to revitalize all equipment at once (one-phase revitalization), or - whether it is possible to postpone the revitalization of a part of equipment for the next period (phased revitalization). Both concepts have some specific advantages and disadvantages. In essence the decision-making process between these two approaches, three basic conditions should be considered: technical-technological adequacy, energy-economy adequacy and financial adequacy. This paper covers general considerations, approach and methodology implemented during the revitalization the Tuzla Thermal Power Plant's Unit 3 (100MW) which was imposed by urgent demands of the Power System, the war conditions and financial possibilities including: - General data on TPP Tuzla and Unit 3 - Scope of work and economic effects

  9. Unit size limitations in smaller power systems

    International Nuclear Information System (INIS)

    McConnach, J.S.

    1975-01-01

    The developing nations have generally found it an economic necessity to accept the minimum commercial size limit of 600 MWe. Smaller reactor sizes tendered as 'one off' specials carry high specific cost penalties which considerably weaken the competitiveness of nuclear versus conventional thermal plants. The revised IAEA market survey for nuclear power in developing countries (1974 edition) which takes account of the recent heavy escalation in oil prices, indicates a reasonable market for smaller size reactors in the range 150 MWe to 400 MWe, but until this market is approached seriously by manufacturers, the commercial availability and economic viability of smaller size reactors remains uncertain. (orig.) [de

  10. The costs of nuclear power in the Netherlands

    International Nuclear Information System (INIS)

    1978-01-01

    A study on the costs of nuclear power generation in the Netherlands is presented. Light water cooled reactors are chosen as nuclear power plants and no difference is made in calculating the costs between a PWR type reactor and a BWR type reactor. The power plants have an output of 1000 MWe. From each part of the whole fuel cycle the costs are determined, taking into account interest, investments, time of construction, labor costs, insurances etc. Also are determined from each part of the fuel cycle the energy costs; the costs per kWh. Finally a comparison is made in costs between a 1000 MWe power plant and a 600 MWe power plant

  11. Nuclear power plant cost underestimation: mechanisms and corrections

    International Nuclear Information System (INIS)

    Meyer, M.B.

    1984-01-01

    Criticisms of inaccurate nuclear power plant cost estimates have commonly focused upon what factors have caused actual costs to increase and not upon the engineering cost estimate methodology itself. This article describes two major sources of cost underestimation and suggests corrections for each which can be applied while retaining the traditional engineering methodology in general

  12. An analysis of electric utility embedded power supply costs

    International Nuclear Information System (INIS)

    Kahal, M.; Brown, D.

    1998-01-01

    There is little doubt that for the vast majority of electric utilities the embedded costs of power supply exceed market prices, giving rise to the stranded cost problem. Beyond that simple generalization, there are a number of crucial questions, which this study attempts to answer. What are the regional patterns of embedded cost differences? To what extent is the cost problem attributable to nuclear power? How does the cost of purchased power compare to the cost of utility self-generation? What is the breakdown of utility embedded generation costs between operating costs - which are potentially avoidable--and ownership costs, which by definition are ''sunk'' and therefore not avoidable? How will embedded generation costs and market prices compare over time? These are the crucial questions for states as they address retail-restructuring proposal. This study presents an analysis of generation costs, which addresses these key questions. A computerized costing model was developed and applied using FERC Form 1 data for 1995. The model analyzed embedded power supply costs (i.e.; self-generation plus purchased power) for two groups of investor-owned utilities, 49 non-nuclear vs. 63 nuclear. These two subsamples represent substantially the entire US investor-owned electric utility industry. For each utility, embedded cost is estimated both at busbar and at meter

  13. Cost effective snubber reduction program for nuclear power plants

    International Nuclear Information System (INIS)

    Adams, T.M.; Antaki, G.A.; Chang, K.C.

    1985-01-01

    Due to the stringent seismic requirements imposed on nuclear power plants, piping engineers have resorted to the extensive use of snubbers to support nuclear piping systems. The advantage of snubbers is that they provide dynamic restraint while allowing free thermal growth of the pipe. Unfortunately, as more plants go into operation, utilities have to face the costs of strict in-service inspection requirements and risks of unscheduled or extended plant outages associated with snubber failures. The snubber inspection requirements, defined in plant Technical Specifications, require periodic visual inspections of all snubbers and functional tests of a percentage of the plant snubbers, during refueling outages. For a typical 1000 Mw unit this represents from 50 to several hundred snubbers to be functionally tested at each refueling outage. Should failures occur during testing, the sample size must be further increased. Very quickly the costs and risks of extended shutdowns have led the industry to consider, and in many cases implement, snubber reduction programs. At the same time several changes in seismic design criteria have greatly facilitated the reduction of snubbers, making snubber elimination economically and technically attractive. In this paper we examine the costs and benefits of snubber reduction programs and propose a method for evaluating their cost benefits

  14. The effect of costs on the future of nuclear power

    International Nuclear Information System (INIS)

    Walske, C.

    1984-01-01

    The author discusses the future of the nuclear power industry from an economics and cost-factor point of view, from the point of view of plant management, as it affects and requires personnel training, as R and D cost and competition is involved, as end-user cost is involved, and as efficiency and cost effectiveness of nuclear power fare in comparison with other sources of electrical energy

  15. Unit cost of medical services at different hospitals in India.

    Directory of Open Access Journals (Sweden)

    Susmita Chatterjee

    Full Text Available Institutional care is a growing component of health care costs in low- and middle-income countries, but local health planners in these countries have inadequate knowledge of the costs of different medical services. In India, greater utilisation of hospital services is driven both by rising incomes and by government insurance programmes that cover the cost of inpatient services; however, there is still a paucity of unit cost information from Indian hospitals. In this study, we estimated operating costs and cost per outpatient visit, cost per inpatient stay, cost per emergency room visit, and cost per surgery for five hospitals of different types across India: a 57-bed charitable hospital, a 200-bed private hospital, a 400-bed government district hospital, a 655-bed private teaching hospital, and a 778-bed government tertiary care hospital for the financial year 2010-11. The major cost component varied among human resources, capital costs, and material costs, by hospital type. The outpatient visit cost ranged from Rs. 94 (district hospital to Rs. 2,213 (private hospital (USD 1 = INR 52. The inpatient stay cost was Rs. 345 in the private teaching hospital, Rs. 394 in the district hospital, Rs. 614 in the tertiary care hospital, Rs. 1,959 in the charitable hospital, and Rs. 6,996 in the private hospital. Our study results can help hospital administrators understand their cost structures and run their facilities more efficiently, and we identify areas where improvements in efficiency might significantly lower unit costs. The study also demonstrates that detailed costing of Indian hospital operations is both feasible and essential, given the significant variation in the country's hospital types. Because of the size and diversity of the country and variations across hospitals, a large-scale study should be undertaken to refine hospital costing for different types of hospitals so that the results can be used for policy purposes, such as revising

  16. Unit Cost of Medical Services at Different Hospitals in India

    Science.gov (United States)

    Chatterjee, Susmita; Levin, Carol; Laxminarayan, Ramanan

    2013-01-01

    Institutional care is a growing component of health care costs in low- and middle-income countries, but local health planners in these countries have inadequate knowledge of the costs of different medical services. In India, greater utilisation of hospital services is driven both by rising incomes and by government insurance programmes that cover the cost of inpatient services; however, there is still a paucity of unit cost information from Indian hospitals. In this study, we estimated operating costs and cost per outpatient visit, cost per inpatient stay, cost per emergency room visit, and cost per surgery for five hospitals of different types across India: a 57-bed charitable hospital, a 200-bed private hospital, a 400-bed government district hospital, a 655-bed private teaching hospital, and a 778-bed government tertiary care hospital for the financial year 2010–11. The major cost component varied among human resources, capital costs, and material costs, by hospital type. The outpatient visit cost ranged from Rs. 94 (district hospital) to Rs. 2,213 (private hospital) (USD 1 = INR 52). The inpatient stay cost was Rs. 345 in the private teaching hospital, Rs. 394 in the district hospital, Rs. 614 in the tertiary care hospital, Rs. 1,959 in the charitable hospital, and Rs. 6,996 in the private hospital. Our study results can help hospital administrators understand their cost structures and run their facilities more efficiently, and we identify areas where improvements in efficiency might significantly lower unit costs. The study also demonstrates that detailed costing of Indian hospital operations is both feasible and essential, given the significant variation in the country’s hospital types. Because of the size and diversity of the country and variations across hospitals, a large-scale study should be undertaken to refine hospital costing for different types of hospitals so that the results can be used for policy purposes, such as revising payment rates

  17. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  18. A new look at nuclear power costs

    International Nuclear Information System (INIS)

    Krymm, R.

    1976-01-01

    The evaluation compares estimates for capital costs and fuel cycle costs so as to deduce from estimates of earlier years and from a cost situation which has altered in the meantime, trends for the future. Despite a continuing upward movement of costs, nuclear energy still has a marked advantage over other energy carriers as far as the costs are concerned. However, this alone is not enough anymore to drive nuclear development on, because, in the meantime other, non-economic, factors influence the development. (UA) [de

  19. The unit cost factors and calculation methods for decommissioning - Cost estimation of nuclear research facilities

    International Nuclear Information System (INIS)

    Kwan-Seong Jeong; Dong-Gyu Lee; Chong-Hun Jung; Kune-Woo Lee

    2007-01-01

    Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning costs of nuclear research facilities are composed of labor cost, equipment and materials cost. Of these three categorical costs, the calculation of labor costs are very important because decommissioning activities mainly depend on labor force. Labor costs in decommissioning activities are calculated on the basis of working time consumed in decommissioning objects and works. The working times are figured out of unit cost factors and work difficulty factors. Finally, labor costs are figured out by using these factors as parameters of calculation. The accuracy of decommissioning cost estimation results is much higher compared to the real decommissioning works. (authors)

  20. Closed Brayton Cycle Power Conversion Unit for Fission Surface Power Phase I Final Report

    Science.gov (United States)

    Fuller, Robert L.

    2010-01-01

    A Closed Brayton cycle power conversion system has been developed to support the NASA fission surface power program. The goal is to provide electricity from a small nuclear reactor heat source for surface power production for lunar and Mars environments. The selected media for a heat source is NaK 78 with water as a cooling source. The closed Brayton cycle power was selected to be 12 kWe output from the generator terminals. A heat source NaK temperature of 850 K plus or minus 25 K was selected. The cold source water was selected at 375 K plus or minus 25 K. A vacuum radiation environment of 200 K is specified for environmental operation. The major components of the system are the power converter, the power controller, and the top level data acquisition and control unit. The power converter with associated sensors resides in the vacuum radiation environment. The power controller and data acquisition system reside in an ambient laboratory environment. Signals and power are supplied across the pressure boundary electrically with hermetic connectors installed on the vacuum vessel. System level analyses were performed on working fluids, cycle design parameters, heater and cooling temperatures, and heat exchanger options that best meet the needs of the power converter specification. The goal is to provide a cost effective system that has high thermal-to-electric efficiency in a compact, lightweight package.

  1. Defense Finance and Accounting Service Administration of Unit Costs

    National Research Council Canada - National Science Library

    Lay, F

    1996-01-01

    ...) of products or outputs produced. Audit Objectives. We conducted this part of our audit to find out whether unit costs for goods and services provided by DFAS were determined in accordance with DoD policies and based on actual costs incurred...

  2. 21 CFR 890.5950 - Powered heating unit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Powered heating unit. 890.5950 Section 890.5950...) MEDICAL DEVICES PHYSICAL MEDICINE DEVICES Physical Medicine Therapeutic Devices § 890.5950 Powered heating unit. (a) Identification. A powered heating unit is a device intended for medical purposes that...

  3. 14 CFR 23.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 23.1142... Powerplant Controls and Accessories § 23.1142 Auxiliary power unit controls. Means must be provided on the... power unit. [Doc. No. 26344, 58 FR 18974, Apr. 9, 1993] ...

  4. Finding and development costs in the United States

    International Nuclear Information System (INIS)

    Espenshade, S.A.

    1996-01-01

    The finding and development costs, or reserve replacement costs have become important statistics for benchmarking independent oil and gas companies against one another. However, no standard definition for finding costs exists. Every company reports their costs differently because of different accounting practices. The time period a company uses to calculate its finding costs is also important. Since exploring for a field and developing new properties involves a long lead time, costs should be calculated on an annual basis. Reserve replacement costs should include: acquisition costs, developments costs, exploration costs, geological and geophysical costs, general and administrative costs, drilling costs and improved recovery costs. The importance of independent oil and gas companies was emphasized. They drill 85% of all the wells in the United States and produce 64% of the natural gas and 37% of the crude oil. In the lower 48 states alone, they produce 49% of the crude oil. Lightening of regulatory and legislative burdens, opening up access to more public lands, improving the tax situation, and to obtain royalty relief, were considered essential to providing for the energy needs of Americans in the years to come. 12 figs

  5. Some problems on cost of nuclear power

    Energy Technology Data Exchange (ETDEWEB)

    Yamada, A [Japan Energy Economic Research Inst., Tokyo

    1975-12-01

    The price of thermal power from oil has risen sharply. On the other hand, the price of atomic energy which has been expected to be favorable as compared with thermal power is rising slowly. In addition, the financial strength of electric utilities if lower, which results in difficulty of financing atomic power development. The course and the motivation of introducing nuclear power generation are briefly summarized. The economy and the usefulness of nuclear power generation and the problem of the financing for developing atomic energy are also examined.

  6. Simulation of the energy - environment economic system power generation costs in power-stations

    International Nuclear Information System (INIS)

    Weible, H.

    1978-09-01

    The costs of power generation are an important point in the electricity industry. The present report tries to supply a model representation for these problems. The costs of power generation for base load, average and peak load power stations are examined on the basis of fossil energy sources, nuclear power and water power. The methods of calculation where dynamic investment calculation processes are used, are given in the shape of formulae. From the point of view of long term prediction, power generation cost sensitivity studies are added to the technical, economic and energy-political uncertainties. The sensitivity of models for calculations is examined by deterministic and stochastic processes. In the base load and average region, power generation based on nuclear power and water power is economically more favourable than that from fossilfired power stations. Even including subsidies, this cost advantage is not in doubt. In the peak load region, pumped storage power stations are more economic than fossilfired power stations. (orig.) [de

  7. Capital cost: pressurized water reactor plant. Commerical electric power cost studies

    International Nuclear Information System (INIS)

    1977-06-01

    The investment cost study for the 1139-MW(e) pressurized water reactor (PWR) central station power plant consists of two volumes. This volume includes in addition to the foreword and summary, the plant description and the detailed cost estimate

  8. Uncovering the Hidden Transaction Costs of Market Power

    DEFF Research Database (Denmark)

    Foss, Kirsten; Foss, Nicolai J.; Klein, Peter G.

    2018-01-01

    A central construct in competitive strategy research is market power, the ability to raise price above marginal cost. Positioning research focuses on attempts to build, protect, and exercise market power. However, this approach contains hidden assumptions about transaction costs. Parties made worse...... off by the exercise of market power can negotiate, bargain, form coalitions, and otherwise contract around the focal firm's attempts to appropriate monopoly profits—depending on transaction costs. We build on property rights economics to explain how transaction costs affect positioning and offer...

  9. Converter Monitoring Unit for Retrofit of Wind Power Converters

    DEFF Research Database (Denmark)

    Rannestad, Bjorn; Maarbjerg, Anders Eggert; Frederiksen, Kristian

    2018-01-01

    A Converter Monitoring Unit (CMU), which will enable condition monitoring of wind turbine converters is presented in this paper. Reducing the cost of corrective maintenance by means of condition monitoring is a way of lowering Operation & Maintenance (O&M) costs for wind turbine systems....... The CMU must be able to detect a broad range of failure modes related to Insulated Gate Bipolar Transistor (IGBT) power modules and associated gate drives. IGBT collector-emitter on-state voltage (vceon) and current (ic) is sampled in the CMU and used for detection of emerging failures. A new method...... for compensation of unwanted inductive voltage drop in the vceon measurement path is presented, enabling retrofitting of CMUs in existing wind turbines. Finally, experimental results obtained on a prototype CMU are presented. Experimentally the vceon dependency to IGBT junction temperature and deterioration...

  10. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R. II.

    1993-05-01

    Several advanced power plant concepts are currently under development. These include the Modular High Temperature Gas Cooled Reactors, the Advanced Liquid Metal Reactor and the Advanced Light Water Reactors. One measure of the attractiveness of a new concept is its cost. Invariably, the cost of a new type of power plant will be compared with other alternative forms of electrical generation. This report provides a common starting point, whereby the cost estimates for the various power plants to be considered are developed with common assumptions and ground rules. Comparisons can then be made on a consistent basis. This is the second update of these cost estimate guidelines. Changes have been made to make the guidelines more current (January 1, 1992) and in response to suggestions made as a result of the use of the previous report. The principal changes are that the reference site has been changed from a generic Northeast (Middletown) site to a more central site (EPRI's East/West Central site) and that reference bulk commodity prices and labor productivity rates have been added. This report is designed to provide a framework for the preparation and reporting of costs. The cost estimates will consist of the overnight construction cost, the total plant capital cost, the operation and maintenance costs, the fuel costs, decommissioning costs and the power production or busbar generation cost

  11. Future perspective of cost for nuclear power generation

    International Nuclear Information System (INIS)

    Maeda, Ichiro

    1988-01-01

    The report presents and discussed results of evaluation of the cost for power generation in this and forthcoming years on the basis of an analysis of the current fuel prices and the economics of various power sources. Calculations show that nuclear power generation at present is inferior to coal-firing power generation in terms of required costs, but can become superior in the future due to an increased burn-up and reduced construction cost. Investigations are made of possible contributions of future technical improvements to reduction in the overall cost. Results suggest that nuclear power generation will be the most efficient among the various electric sources because of its technology-intensive feature. Development of improved light water reactors is of special importance to achieve a high burn-up and reduced construction costs. In general, the fixed cost accounts for a large part of the overall nuclear power generation cost, indicating that a reduction in construction cost can greatly increase the economic efficiency. Changes in the yen's exchange rate seem to have little effect on the economics of nuclear power generation, which represents another favorable aspect of this type of energy. (Nogami, K.)

  12. Nuclear power company activity based costing management analysis

    International Nuclear Information System (INIS)

    Xu Dan

    2012-01-01

    With Nuclear Energy Industry development, Nuclear Power Company has the continual promoting stress of inner management to the sustainable marketing operation development. In view of this, it is very imminence that Nuclear Power Company should promote the cost management levels and built the nuclear safety based lower cost competitive advantage. Activity based costing management (ABCM) transfer the cost management emphases from the 'product' to the 'activity' using the value chain analysis methods, cost driver analysis methods and so on. According to the analysis of the detail activities and the value chains, cancel the unnecessary activity, low down the resource consuming of the necessary activity, and manage the cost from the source, achieve the purpose of reducing cost, boosting efficiency and realizing the management value. It gets the conclusion from the detail analysis with the nuclear power company procedure and activity, and also with the selection to 'pieces analysis' of the important cost related project in the nuclear power company. The conclusion is that the activities of the nuclear power company has the obviously performance. It can use the management of ABC method. And with the management of the procedure and activity, it is helpful to realize the nuclear safety based low cost competitive advantage in the nuclear power company. (author)

  13. Auxiliary power unit for moving a vehicle

    Science.gov (United States)

    Akasam, Sivaprasad [Peoria, IL; Johnson, Kris W [Peoria, IL; Johnson, Matthew D [Peoria, IL; Slone, Larry M [Washington, IL; Welter, James Milton [Chillicothe, IL

    2009-02-03

    A power system is provided having at least one traction device and a primary power source configured to power the at least one traction device. In addition, the power system includes an auxiliary power source also configured to power the at least one traction device.

  14. Imbalance costs in the Swedish system with large amounts of wind power

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Fredrik; Neimane, Viktoria [Vattenfall Research and Development AB, Stockholm (Sweden)

    2009-07-01

    The well-known concerns about wind power are related to its intermittent nature and difficulty to make exact forecasts. The expected increase in balancing and reserve requirements due to wind power has been investigated in several studies. This paper takes the next step in studying integration of large amounts of wind power in Sweden. Several wind power producers' and corresponding balance providers' perspective is taken and their imbalance costs modeled. Larger producers having wind power spread over larger geographical areas will have lower relative costs than producers having their units concentrated within limited geographical area. Possibilities of the wind power producers to reduce the imbalance costs by acting on after sales market are exposed and compared. (orig.)

  15. Incremental cost of PACS in a medical intensive care unit

    Science.gov (United States)

    Langlotz, Curtis P.; Cleff, Bridget; Even-Shoshan, Orit; Bozzo, Mary T.; Redfern, Regina O.; Brikman, Inna; Seshadri, Sridhar B.; Horii, Steven C.; Kundel, Harold L.

    1995-05-01

    Our purpose is to determine the incremental costs (or savings) due to the introduction of picture archiving and communication systems (PACS) and computed radiology (CR) in a medical intensive care unit (MICU). Our economic analysis consists of three measurement methods. The first method is an assessment of the direct costs to the radiology department, implemented in a spreadsheet model. The second method consists of a series of brief observational studies to measure potential changes in personnel costs that might not be reflected in administrative claims. The third method (results not reported here) is a multivariate modeling technique which estimates the independent effect of PACS/CR on the cost of care (estimated from administrative claims data), while controlling for clinical case- mix variables. Our direct cost model shows no cost savings to the radiology department after the introduction of PACS in the medical intensive care unit. Savings in film supplies and film library personnel are offset by increases in capital equipment costs and PACS operation personnel. The results of observational studies to date demonstrate significant savings in clinician film-search time, but no significant change in technologist time or lost films. Our model suggests that direct radiology costs will increase after the limited introduction of PACS/CR in the MICU. Our observational studies show a small but significant effect on clinician film search time by the introduction of PACS/CR in the MICU, but no significant effect on other variables. The projected costs of a hospital-wide PACS are currently under study.

  16. ORCOST-2, PWR, BWR, HTGR, Fossil Fuel Power Plant Cost and Economics

    International Nuclear Information System (INIS)

    Fuller, L.C.; Myers, M.L.

    1975-01-01

    1 - Description of problem or function: ORCOST2 estimates the cost of electrical energy production from single-unit steam-electric power plants. Capital costs and operating and maintenance costs are calculated using base cost models which are included in the program for each of the following types of plants: PWR, BWR, HTGR, coal, oil, and gas. The user may select one of several input/output options for calculation of capital cost, operating and maintenance cost, levelized energy costs, fixed charge rate, annual cash flows, cumulative cash flows, and cumulative discounted cash flows. Options include the input of capital cost and/or fixed charge rate to override the normal calculations. Transmission and distribution costs are not included. Fuel costs must be input by the user. 2 - Method of solution: The code follows the guidelines of AEC Report NUS-531. A base capital-cost model and a base operating- and maintenance-cost model are selected and adjusted for desired size, location, date, etc. Costs are discounted to the year of first commercial operation and levelized to provide annual cost of electric power generation. 3 - Restrictions on the complexity of the problem: The capital cost models are of doubtful validity outside the 500 to 1500 MW(e) range

  17. An analysis of nuclear power plant operating costs

    International Nuclear Information System (INIS)

    1988-01-01

    This report presents the results of a statistical analysis of nonfuel operating costs for nuclear power plants. Most studies of the economic costs of nuclear power have focused on the rapid escalation in the cost of constructing a nuclear power plant. The present analysis found that there has also been substantial escalation in real (inflation-adjusted) nonfuel operating costs. It is important to determine the factors contributing to the escalation in operating costs, not only to understand what has occurred but also to gain insights about future trends in operating costs. There are two types of nonfuel operating costs. The first is routine operating and maintenance expenditures (O and M costs), and the second is large postoperational capital expenditures, or what is typically called ''capital additions.'' O and M costs consist mainly of expenditures on labor, and according to one recently completed study, the majoriy of employees at a nuclear power plant perform maintenance activities. It is generally thought that capital additions costs consist of large maintenance expenditures needed to keep the plants operational, and to make plant modifications (backfits) required by the Nuclear Regulatory Commission (NRC). Many discussions of nuclear power plant operating costs have not considered these capital additions costs, and a major finding of the present study is that these costs are substantial. The objective of this study was to determine why nonfuel operating costs have increased over the past decade. The statistical analysis examined a number of factors that have influenced the escalation in real nonfuel operating costs and these are discussed in this report. 4 figs, 19 tabs

  18. Review on studies for external cost of nuclear power generation

    Energy Technology Data Exchange (ETDEWEB)

    Park, Byung Heung [Korea National University of Transportation, Chungju (Korea, Republic of); Ko, Won Il [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-12-15

    External cost is cost imposed on a third party when producing or consuming a good or service. Since the 1990s, the external costs of nuclear powered electricity production have been studied. Costs are a very important factor in policy decision and the external cost is considered for cost comparison on electricity production. As for nuclear fuel cycle, a chosen technology will determine the external cost. However, there has been little research on this issue. For this study, methods for external cost on nuclear power production have been surveyed and analyzed to develop an approach for evaluating external cost on nuclear fuel cycles. Before the Fukushima accident, external cost research had focused on damage costs during normal operation of a fuel cycle. However, accident cost becomes a major concern after the accident. Various considerations for external cost including accident cost have been used to different studies, and different methods have been applied corresponding to the considerations. In this study, the results of the evaluation were compared and analyzed to identify methodological applicability to the external cost estimation with nuclear fuel cycles.

  19. Review on studies for external cost of nuclear power generation

    International Nuclear Information System (INIS)

    Park, Byung Heung; Ko, Won Il

    2015-01-01

    External cost is cost imposed on a third party when producing or consuming a good or service. Since the 1990s, the external costs of nuclear powered electricity production have been studied. Costs are a very important factor in policy decision and the external cost is considered for cost comparison on electricity production. As for nuclear fuel cycle, a chosen technology will determine the external cost. However, there has been little research on this issue. For this study, methods for external cost on nuclear power production have been surveyed and analyzed to develop an approach for evaluating external cost on nuclear fuel cycles. Before the Fukushima accident, external cost research had focused on damage costs during normal operation of a fuel cycle. However, accident cost becomes a major concern after the accident. Various considerations for external cost including accident cost have been used to different studies, and different methods have been applied corresponding to the considerations. In this study, the results of the evaluation were compared and analyzed to identify methodological applicability to the external cost estimation with nuclear fuel cycles

  20. Cost-effectiveness of low-power nuclear power plants

    International Nuclear Information System (INIS)

    Mitenkov, F.M.; Vostokov, V.S.; Drozhkin, V.N.; Samoilov, O.B.

    1994-01-01

    Many potential consumers of electricity and heat, consuming several thousands of kilowatts (up to 10-15 MW), have now been identified. This is significant primarily for regions far from power grids and other centralized sources of energy, such as, for example, Yakutiya, Northeastern Siberia, and elsewhere. These consumers are now supplied with fossil fuel, which is often difficult and expensive to deliver. For this reason it is very important to develop low-power nuclear power plants for remote regions

  1. QUALITY EVALUATION OF THE TPP POWER GENERATING UNITS WEAR RECONDITIONING

    Directory of Open Access Journals (Sweden)

    E. M. Farhadzadeh

    2016-01-01

    not merely accounts for the information on alteration in the power generating unit emergency-switching standing time number and duration but also for the data of measurement and computation of technical-and-economic indexes. The technical-and-economic indexes variation analysis refinement allows significant rise in the repair work quality evaluation immediacy and in doing so reduces the costs associated with indistinct performance reliability and economical efficiency ranging of the power units based upon specified requirements.

  2. Random power series in the unit ball of Cn

    International Nuclear Information System (INIS)

    Shi Jihuai.

    1989-07-01

    The random power series in the unit disc has been studied by many authors. In this paper, we studied the random power series in the unit ball of C n and generalized some results in the unit disc to the unit ball, in particular, the result obtained recently by Duren has been generalized to the unit ball. The main tool used here is the generalized Salem-Zygmund's theorem. (author). 12 refs

  3. Designing a nuclear power plant with 1000 MW WWER-type units

    Energy Technology Data Exchange (ETDEWEB)

    Berkovich, V; Kaloshin, J; Tatarnikov, V; Shenderovich, A

    1977-06-01

    A brief description is presented of a WWER-1000 nuclear power plant also considering its environmental impact and the problem of core poisoning. The following indicators are graphically shown in relation to the reactor output: turbogenerator unit outputs, efficiency, specific capital costs and own costs of electric power generated by the Voronezh nuclear power plant. Also listed are the specific consumption of metal and concrete, specific equipment weight and the specific volume of the buildings of the main generating unit as well as the cross section thereof.

  4. Designing a nuclear power plant with 1000 MW WWER-type units

    International Nuclear Information System (INIS)

    Berkovich, V.; Kaloshin, J.; Tatarnikov, V.; Shenderovich, A.

    1977-01-01

    A brief description is presented of a WWER-1000 nuclear power plant also considering its environmental impact and the problem of core poisoning. The following indicators are graphically shown in relation to the reactor output: turbogenerator unit outputs, efficiency, specific capital costs and own costs of electric power generated by the Voronezh nuclear power plant. Also listed are the specific consumption of metal and concrete, specific equipment weight and the specific volume of the buildings of the main generating unit as well as the cross section thereof. (J.B.)

  5. Dynamic cost control information system for nuclear power plant construction

    International Nuclear Information System (INIS)

    Wang Yongqing; Liu Wei

    1998-01-01

    The authors first introduce the cost control functions of some overseas popular project management software at present and the specific ways of cost control of nuclear power plant construction in China. Then the authors stress the necessity of cost and schedule control integration and present the concept of dynamic cost control, the design scheme of dynamic cost control information system and the data structure modeling. Based on the above, the authors can develop the system which has the functions of dynamic estimate, cash flow management and cost optimization for nuclear engineering

  6. Power systems simulations of the western United States region

    International Nuclear Information System (INIS)

    Conzelmann, G.; Koritarov, V.; Poch, L.; Thimmapuram, P.; Veselka, T.

    2010-01-01

    This report documents a part of a broad assessment of energy-water-related issues in the western United States. The full analysis involved three Department of Energy national laboratories: Argonne National Laboratory, Los Alamos National Laboratory, and Sandia National Laboratories. Argonne's objective in the overall project was to develop a regional power sector expansion forecast and a detailed unit-level operational (dispatch) analysis. With these two major analysis components, Argonne estimated current and future freshwater withdrawals and consumption related to the operation of U.S. thermal-electric power plants in the Western Electricity Coordinating Council (WECC) region for the period 2005-2025. Water is withdrawn and used primarily for cooling but also for environmental control, such as sulfur scrubbers. The current scope of the analysis included three scenarios: (1) Baseline scenario as a benchmark for assessing the adequacy and cost-effectiveness of water conservation options and strategies, (2) High nuclear scenario, and (3) High renewables scenario. Baseline projections are consistent with forecasts made by the WECC and the Energy Information Administration (EIA) in its Annual Energy Outlook (AEO) (EIA 2006a). Water conservation scenarios are currently limited to two development alternatives that focus heavily on constructing new generating facilities with zero water consumption. These technologies include wind farms and nuclear power plants with dry cooling. Additional water conservation scenarios and estimates of water use associated with fuel or resource extraction and processing will be developed in follow-on analyses.

  7. Experience in connecting the power generating units of thermal power plants to automatic secondary frequency regulation within the united power system of Russia

    International Nuclear Information System (INIS)

    Zhukov, A. V.; Komarov, A. N.; Safronov, A. N.; Barsukov, I. V.

    2009-01-01

    The principles of central control of the power generating units of thermal power plants by automatic secondary frequency and active power overcurrent regulation systems, and the algorithms for interactions between automatic power control systems for the power production units in thermal power plants and centralized systems for automatic frequency and power regulation, are discussed. The order of switching the power generating units of thermal power plants over to control by a centralized system for automatic frequency and power regulation and by the Central Coordinating System for automatic frequency and power regulation is presented. The results of full-scale system tests of the control of power generating units of the Kirishskaya, Stavropol, and Perm GRES (State Regional Electric Power Plants) by the Central Coordinating System for automatic frequency and power regulation at the United Power System of Russia on September 23-25, 2008, are reported.

  8. Heat exchanger inventory cost optimization for power cycles with one feedwater heater

    International Nuclear Information System (INIS)

    Qureshi, Bilal Ahmed; Antar, Mohamed A.; Zubair, Syed M.

    2014-01-01

    Highlights: • Cost optimization of heat exchanger inventory in power cycles is investigated. • Analysis for an endoreversible power cycle with an open feedwater heater is shown. • Different constraints on the power cycle are investigated. • The constant heat addition scenario resulted in the lowest value of the cost function. - Abstract: Cost optimization of heat exchanger inventory in power cycles with one open feedwater heater is undertaken. In this regard, thermoeconomic analysis for an endoreversible power cycle with an open feedwater heater is shown. The scenarios of constant heat rejection and addition rates, power as well as rate of heat transfer in the open feedwater heater are studied. All cost functions displayed minima with respect to the high-side absolute temperature ratio (θ 1 ). In this case, the effect of the Carnot temperature ratio (Φ 1 ), absolute temperature ratio (ξ) and the phase-change absolute temperature ratio for the feedwater heater (Φ 2 ) are qualitatively the same. Furthermore, the constant heat addition scenario resulted in the lowest value of the cost function. For variation of all cost functions, the smaller the value of the phase-change absolute temperature ratio for the feedwater heater (Φ 2 ), lower the cost at the minima. As feedwater heater to hot end unit cost ratio decreases, the minimum total conductance required increases

  9. Regional comparison of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Bowers, H.I.

    1984-01-01

    Nuclear's main disadvantages are its high capital investment cost and uncertainty in schedule compared with alternatives. Nuclear plant costs continue to rise whereas coal plant investment costs are staying relative steady. Based on average experience, nuclear capital investment costs are nearly double those of coal-fired generation plants. The capital investment cost disadvantage of nuclear is balanced by its fuel cost advantages. New base load nuclear power plants were projected to be competitive with coal-fired plants in most regions of the country. Nuclear power costs wre projected to be significantly less (10% or more) than coal-fired power costs in the South Atlantic region. Coal-fired plants were projected to have a significant economic advantage over nuclear plants in the Central and North Central regions. In the remaining seven regions, the levelized cost of power from either option was projected to be within 10%. Uncertainties in future costs of materials, services, and financing affect the relative economics of the nuclear and coal options significantly. 10 figures

  10. POWERCO, Nuclear Power Plant Electricity Cost and Economics

    International Nuclear Information System (INIS)

    Tyson, Frank D.

    1982-01-01

    1 - Description of problem or function: POWERCO calculates the cost of electricity produced by nuclear power stations, assuming all cash expenses such as investment and fuel costs, operating expenses, and taxes are known. The power cost is held constant throughout the project life. 2 - Method of solution: The cost calculation is based on the requirement that income received must provide for recovery of investment, return on investment, and all operating expenses. Equations are developed to calculate true fixed charge rates and true average fuel working capital

  11. Cost estimating relationships for nuclear power plant operationa and maintenance

    International Nuclear Information System (INIS)

    Bowers, H.I.; Fuller, L.C.; Myers, M.L.

    1987-11-01

    Revised cost estimating relationships for 1987 are presented for estimating annual nonfuel operation and maintenance (O and M) costs for light-water reactor (LWR) nuclear power plants, which update guidelines published previously in 1982. The purpose of these cost estimating relationships is for use in long range planning and evaluations of the economics of nuclear energy for electric power generation. A listing of a computer program, LWROM, implementing the cost estimating relationships and written in advanced BASIC for IBM personal computers, is included

  12. Cost analysis of light water reactor power plants

    International Nuclear Information System (INIS)

    Mooz, W.E.

    1978-06-01

    A statistical analysis is presented of the capital costs of light water reactor (LWR) electrical power plants. The objective is twofold: to determine what factors are statistically related to capital costs and to produce a methodology for estimating these costs. The analysis in the study is based on the time and cost data that are available on U.S. nuclear power plants. Out of a total of about 60 operating plants, useful capital-cost data were available on only 39 plants. In addition, construction-time data were available on about 65 plants, and data on completed construction permit applications were available for about 132 plants. The cost data were first systematically adjusted to constant dollars. Then multivariate regression analyses were performed by using independent variables consisting of various physical and locational characteristics of the plants. The dependent variables analyzed were the time required to obtain a construction permit, the construction time, and the capital cost

  13. Costs of Reducing Greenhouse Gas Emissions: A Case Study of India’s Power Generation Sector

    OpenAIRE

    Manish Gupta

    2006-01-01

    If India were to participate in any international effort towards mitigating CO2 emissions, the power sector which is one of the largest emitters of CO2 in the country would be required to play a major role. In this context the study estimates the marginal abatement costs, which correspond to the costs incurred by the power plants to reduce one unit of CO2 from the current level. The study uses an output distance function approach and its duality with the revenue function to derive these costs...

  14. External Costs Related to Power Production Technologies

    DEFF Research Database (Denmark)

    Ibsen, Liselotte Schleisner; Nielsen, Per Sieverts

    1997-01-01

    of the Danish part of the project is to implement the framework for externality evaluation, for three different power plants located in Denmark. The paper will focus on the assessment of the impacts of the whole fuel cycles for wind, natural gas and biogas. Priority areas for environmental impact assessment...

  15. Comparison of electricity production costs of nuclear and coal-fired power plants

    International Nuclear Information System (INIS)

    Peltzer, M.

    1980-01-01

    Electricity production costs of nuclear and coal-fired power plants their structure and future development are calculated and compared. Assumed beginning of operation is in the mid-1980. The technical and economical data are based on a nuclear power unit of 1 300 MW and on a coal-fired twin plant of 2 x 750 MW. The study describes and discusses the calculational method and the results. The costs for the electricity generation show an economic advantage for nuclear power. A sensitivity analysis shows that these results are valid also for changed input parameters. (orig.) [de

  16. Replacement energy costs for nuclear electricity-generating units in the United States: 1997--2001. Volume 4

    International Nuclear Information System (INIS)

    VanKuiken, J.C.; Guziel, K.A.; Tompkins, M.M.; Buehring, W.A.

    1997-09-01

    This report updates previous estimates of replacement energy costs for potential short-term shutdowns of 109 US nuclear electricity-generating units. This information was developed to assist the US Nuclear Regulatory Commission (NRC) in its regulatory impact analyses, specifically those that examine the impacts of proposed regulations requiring retrofitting of or safety modifications to nuclear reactors. Such actions might necessitate shutdowns of nuclear power plants while these changes are being implemented. The change in energy cost represents one factor that the NRC must consider when deciding to require a particular modification. Cost estimates were derived from probabilistic production cost simulations of pooled utility system operations. Factors affecting replacement energy costs, such as random unit failures, maintenance and refueling requirements, and load variations, are treated in the analysis. This report describes an abbreviated analytical approach as it was adopted to update the cost estimates published in NUREG/CR-4012, Vol. 3. The updates were made to extend the time frame of cost estimates and to account for recent changes in utility system conditions, such as change in fuel prices, construction and retirement schedules, and system demand projects

  17. Cost of umbilical cord blood units released for transplantation.

    Science.gov (United States)

    Sirchia, G; Rebulla, P; Tibaldi, S; Lecchi, L

    1999-06-01

    A large number of institutions have started programs banking umbilical cord blood (UCB) for allogeneic unrelated-donor and related-donor transplantation. However, limited information is available on the financial issues surrounding these activities. The aim of this study was to determine the fee per UCB unit released for transplantation that would allow cost recovery after 10 years. Three organizational models were considered suitable to provide units for five UCB transplants per 1 million population per year, a figure that would translate into an annual need for 280 units in Italy. Models A, B, and C included, respectively, seven networked banks, each with an inventory of 1,500 units; two networked banks, each with an inventory of 5,000 units; and one bank with an inventory of 10,000 units. It was estimated that it would take 3 years to develop the cryopreserved inventory and that approximately 3 percent of the inventory could be released and replaced each year during the 7-year interval between the fourth and tenth years of activity. The data on the costs of labor, reagents and diagnostics, disposables, depreciation and maintenance, laboratory tests, and overhead, as well as the operational data used in the analysis were collected at the Milano Cord Blood Bank in 1996. Fees of US $15,061, $12,666, and $11,602 per unit released during the fourth through the tenth years of activity allow full cost recovery (principle and interest) under Models A, B, and C, respectively. Although UCB procurement costs compare favorably with those of other hematopoietic cell sources, these results and the current fee of US $15,300 used in some institutions show that UCB is an expensive resource. Therefore, judicious planning of banking programs with high quality standards is necessary to prevent economic losses. The advantages of lower fees associated with the centralized banking approach of Model C should be balanced with the more flexible collection offered by Model A.

  18. Decommissioning of Swedish nuclear power reactors. Technology and costs

    International Nuclear Information System (INIS)

    1994-06-01

    The main topics discussed are planning, technology and costs of decommissioning nuclear power reactors. Oskarshamn-3 (BWR) and Ringhals-4 (PWR) have been used as reference reactors. 29 refs, figs, tabs

  19. On Decommissioning Cost for Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Varley, Geoff (NAC International (United Kingdom)); Rush, Chris (NAC International (United States))

    2011-01-15

    The two biggest changes in NPP DandD over the last 15 years that are applicable across all countries are: a. Equipment and tools used in NPP DandD have evolved to be available on a more industrial basis, although concerning DandD of the main NPP components, such activity typically is very individual and requires one-of equipment to be developed. b. Regulation of DandD has increased. Earlier regulations were adapting to what emerged from evolving DandD projects. Today regulatory requirements have caught up and have been framed based on the feedback of experience over the last 15 years. In general they impose prescriptive requirements on DandD approaches and execution. In the U.S. access to LLW disposal has been opened up to a majority of states, which will ease the development and timely execution of DandD projects. A newly emerging trend in the U.S. is that segregation of some categories of waste, to facilitate the disposal of some volumes in general landfill rather than in radioactive waste disposal facilities, is being sacrificed, on cost grounds, in favour of mixing waste volumes with the consequence of having to dispose of a larger volume of waste in a LLW facility. Regarding access to information that can be meaningful and sufficiently detailed to support an international benchmarking inter-comparison of NPP DandD cost information: - NAC has established good access to detailed information on actual DandD projects at one U.S. PWR (Trojan) and one U.S. BWR (Rancho Seco). Additional information sources probably can be accessed with additional investigation. - Germany has highly relevant cost estimate and actual NPP DandD experience. Accessibility of the information is not yet fully determined. This will need more extensive, face-to-face interaction with the relevant stakeholders. Utilities and cost estimate service providers offer the opportunity to access relevant information. Specific terms and conditions that would apply and the extent of detail that would be

  20. On Decommissioning Cost for Nuclear Power Plants

    International Nuclear Information System (INIS)

    Varley, Geoff; Rush, Chris

    2011-01-01

    The two biggest changes in NPP DandD over the last 15 years that are applicable across all countries are: a. Equipment and tools used in NPP DandD have evolved to be available on a more industrial basis, although concerning DandD of the main NPP components, such activity typically is very individual and requires one-of equipment to be developed. b. Regulation of DandD has increased. Earlier regulations were adapting to what emerged from evolving DandD projects. Today regulatory requirements have caught up and have been framed based on the feedback of experience over the last 15 years. In general they impose prescriptive requirements on DandD approaches and execution. In the U.S. access to LLW disposal has been opened up to a majority of states, which will ease the development and timely execution of DandD projects. A newly emerging trend in the U.S. is that segregation of some categories of waste, to facilitate the disposal of some volumes in general landfill rather than in radioactive waste disposal facilities, is being sacrificed, on cost grounds, in favour of mixing waste volumes with the consequence of having to dispose of a larger volume of waste in a LLW facility. Regarding access to information that can be meaningful and sufficiently detailed to support an international benchmarking inter-comparison of NPP DandD cost information: - NAC has established good access to detailed information on actual DandD projects at one U.S. PWR (Trojan) and one U.S. BWR (Rancho Seco). Additional information sources probably can be accessed with additional investigation. - Germany has highly relevant cost estimate and actual NPP DandD experience. Accessibility of the information is not yet fully determined. This will need more extensive, face-to-face interaction with the relevant stakeholders. Utilities and cost estimate service providers offer the opportunity to access relevant information. Specific terms and conditions that would apply and the extent of detail that would be

  1. Methodical recommendations for power unit comprehensive engineering and radiation survey

    International Nuclear Information System (INIS)

    Nosovskij, A.V.

    2000-01-01

    The article describes power unit radiation survey methods developed and applied during conduction of Ch NPP unit I Comprehensive Engineering Radiation Survey. Special requirements for units under decommissioning, main survey principals, criteria for definition of volume and the order of survey for various systems of a NPP Unit are included

  2. CONCEPT-5 user's manual. [Power plant costs

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, C.R. II

    1979-01-01

    The CONCEPT computer code package was developed to provide conceptual capital cost estimates for nuclear-fueled and fossil-fired power plants. Cost estimates can be made as a function of plant type, size, location, and date of initial operation. The output includes a detailed breakdown of the estimate into direct and indirect costs similar to the accounting system described in document NUS--531. Cost models are currently provided in CONCEPT 5 for single- and multiunit pressurized-water reactors, boiling-water reactors, and cost-fired plants with and without flue gas desulfurization equipment.

  3. Cost Savings of Nuclear Power with Total Fuel Reprocessing

    International Nuclear Information System (INIS)

    Solbrig, Charles W.; Benedict, Robert W.

    2006-01-01

    The cost of fast reactor (FR) generated electricity with pyro-processing is estimated in this article. It compares favorably with other forms of energy and is shown to be less than that produced by light water reactors (LWR's). FR's use all the energy in natural uranium whereas LWR's utilize only 0.7% of it. Because of high radioactivity, pyro-processing is not open to weapon material diversion. This technology is ready now. Nuclear power has the same advantage as coal power in that it is not dependent upon a scarce foreign fuel and has the significant additional advantage of not contributing to global warming or air pollution. A jump start on new nuclear plants could rapidly allow electric furnaces to replace home heating oil furnaces and utilize high capacity batteries for hybrid automobiles: both would reduce US reliance on oil. If these were fast reactors fueled by reprocessed fuel, the spent fuel storage problem could also be solved. Costs are derived from assumptions on the LWR's and FR's five cost components: 1) Capital costs: LWR plants cost $106/MWe. FR's cost 25% more. Forty year amortization is used. 2) The annual O and M costs for both plants are 9% of the Capital Costs. 3) LWR fuel costs about 0.0035 $/kWh. Producing FR fuel from spent fuel by pyro-processing must be done in highly shielded hot cells which is costly. However, the five foot thick concrete walls have the advantage of prohibiting diversion. LWR spent fuel must be used as feedstock for the FR initial core load and first two reloads so this FR fuel costs more than LWR fuel. FR fuel costs much less for subsequent core reloads ( 6 /MWe. The annual cost for a 40 year licensed plant would be 2.5 % of this or less if interest is taken into account. All plants will eventually have to replace those components which become radiation damaged. FR's should be designed to replace parts rather than decommission. The LWR costs are estimated to be 2.65 cents/kWh. FR costs are 2.99 cents/kWh for the first

  4. Life cycle cost analysis of wind power considering stochastic uncertainties

    International Nuclear Information System (INIS)

    Li, Chiao-Ting; Peng, Huei; Sun, Jing

    2014-01-01

    This paper presents a long-term cost analysis of wind power and compares its competitiveness to non-renewable generating technologies. The analysis considers several important attributes related to wind intermittency that are sometimes ignored in traditional generation planning or LCOE (levelized cost of energy) studies, including the need for more nameplate capacity due to intermittency, hourly fluctuations in wind outputs and cost for reserves. The competitiveness of wind power is assessed by evaluating four scenarios: 1) adding natural gas generating capacity to the power grid; 2) adding coal generating capacity to the power grid; 3) adding wind capacity to the power grid; and, 4) adding wind capacity and energy storage to the power grid where an energy storage device is used to cover wind intermittency. A case study in the state of Michigan is presented to demonstrate the use of the proposed methodology, in which a time horizon from 2010 to 2040 is considered. The results show that wind energy will still be more expensive than natural gas power plants in the next three decades, but will be cheaper than coal capacities if wind intermittency is mitigated. Furthermore, if the costs of carbon emissions and environmental externalities are considered, wind generation will be a competitive option for grid capacity expansion. - Highlights: • The competitiveness of wind power is analyzed via life cycle cost analysis. • Wind intermittency and reserve costs are explicitly considered in the analysis. • Results show that wind is still more expensive than natural gas power plants. • Wind can be cheaper than coal capacities if wind intermittency is mitigated. • Wind will be competitive if costs of carbon emissions are considered

  5. Powering Africa - Projected costs and emissions

    Science.gov (United States)

    Pappis, Ioannis; Taliotis, Constantinos; Howells, Mark; Lindblad, Nicolina

    2017-04-01

    Energy is a fundamental driver of economic growth. Several Sub-Saharan African countries are amongst the least developing economies in the world. A large proportion of the population in the region also lacks access to electricity and other modern energy services, while the individuals who have access are faced with frequent outages. This paper presents scenarios in which universal electricity access across the African continent is achieved by 2030 at a range of electricity consumption levels. A cost-optimization model is used to identify the least-cost generation mix in each country individually so as to meet the projected demand. Several generation options are allowed in each nation, while cross-border electricity trade is enabled at existing and future planned levels, so as to allow exploitation of untapped energy resources in remote regions of the continent. The results indicate that with a higher electricity consumption, CO2 emissions in generation increase considerably. This is due to coal rising as one of the dominant fuels in the supply of centralized electricity, and is of particular importance in climate change negotiations.

  6. Cost-estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R.

    1993-01-01

    Various advanced power plant concepts are currently under development. These include several advanced light water reactors as well as the modular high-temperature gas-cooled reactor and the advanced liquid-metal reactor. One measure-of the attractiveness of a new concept is cost. Invariably, the cost of a new type of power plant will be compared with other alternative forms of electric generation. In order to make reasonable comparative assessments of competing technologies, consistent ground rules and assumptions must be applied when developing cost estimates. This paper describes the cost-estimate guidelines developed by Oak Ridge National Laboratory for the U.S. Department of Energy (DOE) to be used in developing cost estimates for the advanced nuclear reactors and how these guidelines relate to the DOE cost verification process

  7. Nuclear power production: The financial costs. Background paper

    International Nuclear Information System (INIS)

    Berg, P.

    1993-11-01

    For many years, the Canadian nuclear industry has priced itself on its ability to provide safe, reliable and low-cost electricity to consumers. While nuclear power has indeed proved to be a relatively safe generator of electricity, its performance with respect to reliability and cost has declined noticeably in recent years. This paper documents the deteriorating cost performance of the industry, in comparison with that of its traditional competitor in power generation. It also breaks down the total costs into its component parts, assessing the key factors underlying the trends that are worsening the competitive position of the industry: a rise in initial capital costs, unanticipated technical difficulties resulting in additional capital costs, and the increasing operating expenses associated with poorer-than-expected reactor performance. (author). 8 refs., 2 tabs., 1 fig

  8. Evaluating decommissioning costs for nuclear power plants

    International Nuclear Information System (INIS)

    MacDonald, R.R.

    1980-01-01

    An overview is presented of the economic aspects of decommissioning of large nuclear power plants in an attempt to put the subject in proper perspective. This is accomplished by first surveying the work that has been done to date in evaluating the requirements for decommissioning. A review is presented of the current concepts of decommissioning and a discussion of a few of the uncertainties involved. This study identifies the key factors to be considered in the econmic evaluation of decommissioning alternatives and highlights areas in which further study appears to be desirable. 12 refs

  9. CONCEPT-5, Cost and Economics Analysis for Nuclear Fuel or Fossil Fuel Power Plant

    International Nuclear Information System (INIS)

    Bowers, H.I.; Gratteau, J.E.; Zielsinki, T.J.

    1992-01-01

    1 - Description of problem or function: The CONCEPT computer code system was developed to provide conceptual capital cost estimates for nuclear and coal-fired power plants. Cost estimates can be made as a function of plant type, size, location, and date of initial operation. The output includes a detailed breakdown of the estimate into direct and indirect costs similar to the accounting system described in document NUS-531. Cost models are provided in CONCEPT5, the fifth generation in the development of the CONCEPT package, for single-unit coal-fired plants, pressurized-water reactors, boiling- water reactors, liquid-metal-cooled reactors, and multi-unit coal- fired plants based on today's average or best operating experience. Costs may be obtained for any of twenty U.S. cities, a hypothetical Middletown site, and two Canadian cities. CONCEPT5 models are updated models of those available in CONCEPT3 and, in addition, this edition contains historical factory equipment cost data for the generation of cost indices and escalation rates; indirect costs are calculated as a function of unit size rather than a function of direct costs; and an indirect cost account for owner's costs and an improved time-dependent escalation feature are included. The CONCEPT3 models and cost data are outdated; the package is being retained in the library since it is the only UNIVAC1108 machine version of CONCEPT available and could prove helpful in converting the latest IBM release. 2 - Method of solution: CONCEPT is based on the premise that any central station power plant involves approximately the same major cost components regardless of location or date of initial operation. The program has detailed cost models for each plant type at a reference condition. Through use of size, time, and location- dependent cost adjustments, a reference cost model is modified to produce a specific capital cost estimate. CONCEPT is supported by two auxiliary programs--CONTAC, which generates and maintains

  10. Reliability of Power Units in Poland and the World

    OpenAIRE

    Józef Paska

    2015-01-01

    One of a power system’s subsystems is the generation subsystem consisting of power units, the reliability of which to a large extent determines the reliability of the power system and electricity supply to consumers. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. They are compared and analysed on the basis of data published by the Energy Market Agency (Poland), NERC (North American Electric Reliability Corporation – USA), ...

  11. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1986-07-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies

  12. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R. II.

    1990-03-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies. 10 refs., 8 figs., 32 tabs

  13. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1987-07-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies

  14. 75 FR 80547 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption

    Science.gov (United States)

    2010-12-22

    ..., Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption 1.0 Background Carolina Power & Light Company... operation of the Shearon Harris Nuclear Power Plant (HNP), Unit 1. The license provides, among other things... request to generically extend the rule's compliance date for all operating nuclear power plants, but noted...

  15. Optimal unit commitment of the power system in Bulgaria during the transitional period to power wholesale market (cont..)

    International Nuclear Information System (INIS)

    Stoilov, D.

    2001-01-01

    The first part of the parer considers the general problem of optimal yearly unit commitment in the new economical conditions in Bulgaria. The second part deals with non-convex problem , taking into account some costs for starting and stopping of power systems. The transition from yearly commitment to weekly or daily dispatching is commented

  16. Prediction of Decommissioning Cost for Kijang Research Reactor Using Power Data of DACCORD

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Yun Jeong; Jin, Hyung Gon; Park, Hee Seong; Park, Seung Kook [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are 3 types of cost estimate that can be used, and each have a different level of accuracy: (i) Order of magnitude estimate: One without detailed engineering data, where an estimate is prepared using scale-up or -down factors and approximate ratios. It is likely that the overall scope of the project has not been well defined. The level of accuracy expected is -30% to +50%. The cost plans to predict referring to abroad examples as decommissioning cost estimation has still not developed and been commercial method for Kijang research reactor. In Kijang research reactor case, overall scope of business isn't yet decided. Then it is supposed to estimate cost with type (i). The IAEA project, entitled 'DACCORD' (Data Analysis and Collection for Costing of Research Reactor Decommissioning) performs decommissioning costing after collecting and analyzing the information related to research reactors around the world for several years. Also decommissioning costing method development tends to increase in the each country. This paper aims to estimate preliminary decommissioning cost based on total decommissioning cost per thermal power rate of research reactor presented in DACCORD project' data which is collected by member state. In this paper, preliminary decommissioning cost is estimated based on total decommissioning cost per thermal power rate of research reactor presented in DACCORD data which is collected by member state. Although there exists a general tendency for costs to increase with increasing thermal power, the limited data available show that decommissioning costs at any given power level can vary widely, with increased variability at higher power levels. Variations in decommissioning cost for the research reactors of the same or similar thermal power are caused by differences in reactor types and design, decommissioning project scopes, country- specific unit workforce costs, and other reactor or project factors. An important factor for the

  17. Costs of solar and wind power variability for reducing CO2 emissions.

    Science.gov (United States)

    Lueken, Colleen; Cohen, Gilbert E; Apt, Jay

    2012-09-04

    We compare the power output from a year of electricity generation data from one solar thermal plant, two solar photovoltaic (PV) arrays, and twenty Electric Reliability Council of Texas (ERCOT) wind farms. The analysis shows that solar PV electricity generation is approximately one hundred times more variable at frequencies on the order of 10(-3) Hz than solar thermal electricity generation, and the variability of wind generation lies between that of solar PV and solar thermal. We calculate the cost of variability of the different solar power sources and wind by using the costs of ancillary services and the energy required to compensate for its variability and intermittency, and the cost of variability per unit of displaced CO(2) emissions. We show the costs of variability are highly dependent on both technology type and capacity factor. California emissions data were used to calculate the cost of variability per unit of displaced CO(2) emissions. Variability cost is greatest for solar PV generation at $8-11 per MWh. The cost of variability for solar thermal generation is $5 per MWh, while that of wind generation in ERCOT was found to be on average $4 per MWh. Variability adds ~$15/tonne CO(2) to the cost of abatement for solar thermal power, $25 for wind, and $33-$40 for PV.

  18. Estimating the costs of nuclear power: benchmarks and uncertainties

    International Nuclear Information System (INIS)

    Leveque, Francois

    2013-05-01

    The debate on this topic is fairly confusing. Some present electricity production using nuclear power as an affordable solution, others maintain it is too expensive. These widely divergent views prompt fears among consumers and voters that they are being manipulated: each side is just defending its own interests and the true cost of nuclear power is being concealed. Companies and non-government organizations certainly adopt whatever position suits them best. But at the same time, the notion of just one 'true' cost is misleading. As we shall see in this paper there is no such thing as the cost of nuclear power: we must reason in terms of costs and draw a distinction between a private cost and a social cost. The private cost is what an operator examines before deciding whether it is opportune to build a new nuclear power station. This cost varies between different investors, particularly as a function of their attitude to risks. On the other hand the social cost weighs on society, which may take into account the risk of proliferation, or the benefits of avoiding carbon-dioxide emissions, among others. The cost of actually building new plant differs from one country to the next. So deciding whether nuclear power is profitable or not, a benefit for society or not, does not involve determining the real cost, but rather compiling data, developing methods and formulating hypotheses. It is not as easy as inundating the general public with contradictory figures, but it is a more effective way of casting light on economic decisions by industry and government. Without evaluating the costs it is impossible to establish the cost price, required to compare electricity production using nuclear power and rival technologies. Would it be preferable to build a gas-powered plant, a nuclear reactor or a wind farm? Which technology yields the lowest cost per KWh? Under what conditions - financial terms, regulatory framework, carbon pricing - will private investors see an adequate return

  19. EFFICIENCY AND COST MODELLING OF THERMAL POWER PLANTS

    Directory of Open Access Journals (Sweden)

    Péter Bihari

    2010-01-01

    Full Text Available The proper characterization of energy suppliers is one of the most important components in the modelling of the supply/demand relations of the electricity market. Power generation capacity i. e. power plants constitute the supply side of the relation in the electricity market. The supply of power stations develops as the power stations attempt to achieve the greatest profit possible with the given prices and other limitations. The cost of operation and the cost of load increment are thus the most important characteristics of their behaviour on the market. In most electricity market models, however, it is not taken into account that the efficiency of a power station also depends on the level of the load, on the type and age of the power plant, and on environmental considerations. The trade in electricity on the free market cannot rely on models where these essential parameters are omitted. Such an incomplete model could lead to a situation where a particular power station would be run either only at its full capacity or else be entirely deactivated depending on the prices prevailing on the free market. The reality is rather that the marginal cost of power generation might also be described by a function using the efficiency function. The derived marginal cost function gives the supply curve of the power station. The load level dependent efficiency function can be used not only for market modelling, but also for determining the pollutant and CO2 emissions of the power station, as well as shedding light on the conditions for successfully entering the market. Based on the measurement data our paper presents mathematical models that might be used for the determination of the load dependent efficiency functions of coal, oil, or gas fuelled power stations (steam turbine, gas turbine, combined cycle and IC engine based combined heat and power stations. These efficiency functions could also contribute to modelling market conditions and determining the

  20. Modeling Small Scale Solar Powered ORC Unit for Standalone Application

    Directory of Open Access Journals (Sweden)

    Enrico Bocci

    2012-01-01

    Full Text Available When the electricity from the grid is not available, the generation of electricity in remote areas is an essential challenge to satisfy important needs. In many developing countries the power generation from Diesel engines is the applied technical solution. However the cost and supply of fuel make a strong dependency of the communities on the external support. Alternatives to fuel combustion can be found in photovoltaic generators, and, with suitable conditions, small wind turbines or microhydroplants. The aim of the paper is to simulate the power generation of a generating unit using the Rankine Cycle and using refrigerant R245fa as a working fluid. The generation unit has thermal solar panels as heat source and photovoltaic modules for the needs of the auxiliary items (pumps, electronics, etc.. The paper illustrates the modeling of the system using TRNSYS platform, highlighting standard and “ad hoc” developed components as well as the global system efficiency. In the future the results of the simulation will be compared with the data collected from the 3 kW prototype under construction in the Tuscia University in Italy.

  1. The prospects for cost competitive solar PV power

    International Nuclear Information System (INIS)

    Reichelstein, Stefan; Yorston, Michael

    2013-01-01

    New solar Photovoltaic (PV) installations have grown globally at a rapid pace in recent years. We provide a comprehensive assessment of the cost competitiveness of this electric power source. Based on data available for the second half of 2011, we conclude that utility-scale PV installations are not yet cost competitive with fossil fuel power plants. In contrast, commercial-scale installations have already attained cost parity in the sense that the generating cost of power from solar PV is comparable to the retail electricity prices that commercial users pay, at least in certain parts of the U.S. This conclusion is shown to depend crucially on both the current federal tax subsidies for solar power and an ideal geographic location for the solar installation. Projecting recent industry trends into the future, we estimate that utility-scale solar PV facilities are on track to become cost competitive by the end of this decade. Furthermore, commercial-scale installations could reach “grid parity” in about ten years, if the current federal tax incentives for solar power were to expire at that point. - Highlights: ► Assessment of the cost competitiveness of new solar Photovoltaic (PV) installations. ► Utility-scale PV installations are not yet cost competitive with fossil fuel power plants. ► Commercial-scale installations have already attained cost parity in certain parts of the U.S. ► Utility-scale solar PV facilities are on track to become cost competitive by the end of this decade

  2. Determination of technical and economic parameters of an ionic transport membrane air separation unit working in a supercritical power plant

    Directory of Open Access Journals (Sweden)

    Kotowicz Janusz

    2016-09-01

    Full Text Available In this paper an air separation unit was analyzed. The unit consisted of: an ionic transport membrane contained in a four-end type module, an air compressor, an expander fed by gas that remains after oxygen separation and heat exchangers which heat the air and recirculated flue gas to the membrane operating temperature (850 °C. The air separation unit works in a power plant with electrical power equal to 600 MW. This power plant additionally consists of: an oxy-type pulverized-fuel boiler, a steam turbine unit and a carbon dioxide capture unit. Life steam parameters are 30 MPa/650 °C and reheated steam parameters are 6 MPa/670 °C. The listed units were analyzed. For constant electrical power of the power plant technical parameters of the air separation unit for two oxygen recovery rate (65% and 95% were determined. One of such parameters is ionic membrane surface area. In this paper the formulated equation is presented. The remaining technical parameters of the air separation unit are, among others: heat exchange surface area, power of the air compressor, power of the expander and auxiliary power. Using the listed quantities, the economic parameters, such as costs of air separation unit and of individual components were determined. These quantities allowed to determine investment costs of construction of the air separation unit. In addition, they were compared with investment costs for the entire oxy-type power plant.

  3. The Potential for Low-Cost Concentrating Solar Power Systems

    International Nuclear Information System (INIS)

    Price, Henry W.; Carpenter, Stephen

    1999-01-01

    Concern over the possibility of global climate change as a result of anthropogenic greenhouse gas buildup in the atmosphere is resulting in increased interest in renewable energy technologies. The World Bank recently sponsored a study to determine whether solar thermal power plants can achieve cost parity with conventional power plants. The paper reviews the conclusions of that study

  4. Reliability-cost models for the power switching devices of wind power converters

    DEFF Research Database (Denmark)

    Ma, Ke; Blaabjerg, Frede

    2012-01-01

    In order to satisfy the growing reliability requirements for the wind power converters with more cost-effective solution, the target of this paper is to establish a new reliability-cost model which can connect the relationship between reliability performances and corresponding semiconductor cost...... temperature mean value Tm and fluctuation amplitude ΔTj of power devices, are presented. With the proposed reliability-cost model, it is possible to enable future reliability-oriented design of the power switching devices for wind power converters, and also an evaluation benchmark for different wind power...... for power switching devices. First the conduction loss, switching loss as well as thermal impedance models of power switching devices (IGBT module) are related to the semiconductor chip number information respectively. Afterwards simplified analytical solutions, which can directly extract the junction...

  5. Anticorrosion and halobios control for tidal power generating units

    International Nuclear Information System (INIS)

    Shen, J C; Ding, L X

    2012-01-01

    The anticorrosion and halobios control is the key techniquesrelated to the safety and durability of tidal power generating units. The technique of material application, antifouling coating and cathodic protection are often adopted. The technical research, application, updating and development are carried on Jiangxia Tidal Power Station, which is based on the old Unit 1-Unit 5 operated for nearly 30 years, and the new Unit 6 operated in 2007. It is found that stainless steeland the antifouling coating used in Unit 1- Unit 5 are very effective, but cathodic protection is often likely to fail because of the limitation of structure and installation. Analyses and studies for anticorrosion and halobios control techniques of tidal power generating units according to theory, experience and actual effects have been done, which can be for reference to the tidal power station designers and builders.

  6. Understanding the cost of power interruptions to U.S. electricity consumers

    Energy Technology Data Exchange (ETDEWEB)

    LaCommare, Kristina Hamachi; Eto, Joseph H.

    2004-09-01

    The massive electric power blackout in the northeastern United States and Canada on August 14-15, 2003 resulted in the U.S. electricity system being called ''antiquated'' and catalyzed discussions about modernizing the grid. Industry sources suggested that investments of $50 to $100 billion would be needed. This report seeks to quantify an important piece of information that has been missing from these discussions: how much do power interruptions and fluctuations in power quality (power-quality events) cost U.S. electricity consumers? Accurately estimating this cost will help assess the potential benefits of investments in improving the reliability of the grid. We develop a comprehensive end-use framework for assessing the cost to U.S. electricity consumers of power interruptions and power-quality events (referred to collectively as ''reliability events''). The framework expresses these costs as a function of: (1) Number of customers by type in a region; (2) Frequency and type of reliability events experienced annually (including both power interruptions and power-quality events) by these customers; (3) Cost of reliability events; and (4) Vulnerability of customers to these events. The framework is designed so that its cost estimate can be improved as additional data become available. Using our framework, we estimate that the national cost of power interruptions is about $80 billion annually, based on the best information available in the public domain. However, there are large gaps in and significant uncertainties about the information currently available. Notably, we were not able to develop an estimate of power-quality events. Sensitivity analysis of some of these uncertainties suggests that the total annual cost could range from less than $30 billion to more than $130 billion. Because of this large range and the enormous cost of the decisions that may be based on this estimate, we encourage policy makers, regulators, and

  7. Environmental remediation cost in Fukushima area. Trial calculation using the unit cost factor method

    International Nuclear Information System (INIS)

    Ishikura, Takeshi; Fujita, Reiko

    2013-01-01

    In order to perform environmental remediation in Fukushima area in a swift and adequate way, it is necessary to obtain perspective of total cost and allocate resources adequately. At present such had not been fixed as what decontamination method should be applied to relevant contaminated places in Fukushima area or what disposition and processing process should be applied to radioactive soils and wastes produced by decontamination, it would be difficult to assess the cost exactly. But it would be better to calculate rough cost on trial and then upgrade the accuracy of the cost gradually based on latest knowledge. Cleanup subcommittee of AESJ utilized published process flow and unit cost and based on original proposed scenario: soils produced by decontamination were classified into intermediate storage facility and controllable processing place based on their contamination concentration and with limited reuse, rough estimated cost was obtained as 6 - 9 trillion yen for basic case. (T. Tanaka)

  8. Power from Perspective: Potential future United States energy portfolios

    International Nuclear Information System (INIS)

    Tonn, Bruce; Healy, K.C.; Gibson, Amy; Ashish, Ashutosh; Cody, Preston; Beres, Drew; Lulla, Sam; Mazur, Jim; Ritter, A.J.

    2009-01-01

    This paper presents United States energy portfolios for the year 2030, developed from seven different Perspectives. The Perspectives are characterized by different weights placed on fourteen defining values (e.g., cost, social acceptance). The portfolios were constructed to achieve three primary goals, energy independence, energy security, and greenhouse gas reductions. The portfolios are also evaluated over a comprehensive set of secondary criteria (e.g., economic growth, technical feasibility). It is found that very different portfolios based on very different defining values can achieve the three primary goals. Commonalities among the portfolios include reliance upon cellulosic ethanol, nuclear power, and energy efficiency to meet year 2030 energy demands. It is concluded that the US energy portfolio must be diverse and to achieve national energy goals will require an explicit statement of goals, a strong role for government, and coordinated action across society

  9. Safstor decommissioning of the Humboldt Bay Power Plant Unit No. 3

    International Nuclear Information System (INIS)

    Nelson, R.T.

    1985-01-01

    The Humboldt Bay Power Plant is located near Eureka, California, about 265 miles north of San Francisco. The plant consists of two fossil fueled units, two mobil gas turbine peaking units, and a nuclear unit - Unit No. 3. Unit No. 3, which utilized a boiling water reactor, was constructed between 1960 and 1963. The unit began commercial operation in August 1963 and operated until July 2, 1976 when it was shutdown for refueling, seismic modifications, and additional seismic and geologic studies. During the years Unit 3 operated it had one of the best operating records of any nuclear power plant in the United States. For its operating lifetime Unit 3 had an overall capacity factor of 63.0% and an availability factor of 85.9%. The unit included certain design features which made it unique among nuclear power plants of its era. Some of these unique features included natural circulation recirculation flow which eliminated the need for costly recirculation pumps, utilization of a pressure suppression containment system which had been developed jointly by PG and E and the General Electric Company, and the fact that the reactor vessel and the containment system were constructed in a caisson below ground level. These design features reduced the overall construction cost of the unit and improved its inherent safety

  10. The cost of electrolytic hydrogen from off-peak power

    International Nuclear Information System (INIS)

    Stucki, S.

    1991-01-01

    The cost of electrolytic hydrogen depends on the capacity factor of the plant and the cost of electricity. Both these parameters are correlated if off-peak power is to be used for hydrogen production. Based on assumptions regarding the correlation between the electricity price and the availability of electric power, optimizations were run using a simple cost model for the electrolysis plant. The current density at which the electrolysis plant would be run is taken as a variable for optimization as well as the annual time of availability of electric power. The results of the optimizations show for a number of hypothetical electrolyser types that the optimum operation time or electricity price do not depend much on the technology used. Production cost of electrolytic hydrogen can, however, be cut by 30% by using advanced electrolysis technology. (author)

  11. The full costs of thermal power production in Eastern Canada

    International Nuclear Information System (INIS)

    Venema, H.D.; Barg, S.

    2003-07-01

    This study examines the public health and global warming costs associated with generating electricity with fossil fuels such as coal, oil or natural gas. A Full Cost Accounting approach was used to determine the costs for Eastern Canada. The electricity sector is chosen because it is a large emitter of air pollutants and greenhouse gases. The sector it will undergo potentially significant structural changes as Canada complies with the Kyoto Protocol. Alternative investments in nonpolluting sources of electricity should include analysis of full costs. Two types of factors are evaluated in this study: the public health costs caused by emissions of sulphur and nitrogen oxides and volatile organic carbon (VOC) in Eastern Canada, and the marginal climate change damages caused by the emissions of greenhouse gasses (GHGs) in Eastern Canada. The major contribution of this study is the application of the impact-pathway approach to power sector emissions. Recent Canadian studies have reported either the pollutant emission rates for different power generation technologies and fuels, or the health costs of ambient air pollution not specifically attributable to the power sector. This study isolates the component of air pollution attributable to the power sector and analyses its geographic distribution. It was concluded that coal-fired generation should be closely monitored because the externalities burden is the same magnitude as the marginal production cost. 77 refs., 20 tabs., 21 figs

  12. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC)

    OpenAIRE

    Mohammad Javad Abdollahi; Majid Moazzami

    2015-01-01

    In this paper security constraints unit commitment (SCUC) in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested...

  13. CO2 cost pass-through and windfall profits in the power sector

    International Nuclear Information System (INIS)

    Sijm, Jos; Neuhoff, Karsten; Yihsu Chen

    2006-01-01

    In order to cover their CO 2 emissions, power companies receive most of the required EU ETS allowances for free. In line with economic theory, these companies pass on the costs of these allowances in the price of electricity. This article analyses the implications of the EU ETS for the power sector, notably the impact of free allocation of CO 2 emission allowances on the price of electricity and the profitability of power generation. As well as some theoretical reflections, the article presents empirical and model estimates of CO 2 cost pass-through for Germany and The Netherlands, indicating that pass-through rates vary between 60 and 100% of CO 2 costs, depending on the carbon intensity of the marginal production unit and various other market- or technology-specific factors. As a result, power companies realize substantial windfall profits, as indicated by the empirical and model estimates presented in the article. (Author)

  14. Availability and cost functions for periodically inspected preventively maintained units

    International Nuclear Information System (INIS)

    Vaurio, J.K.

    1999-01-01

    Unavailability and cost rate functions are developed for components whose failures can occur randomly but they are detected only by periodic testing or inspections. If a failure occurs between consecutive inspections, the unit remains failed until the next inspection. Components are renewed by preventive maintenance periodically, or by repair or replacement after a failure, whichever occurs first (age-replacement). The model takes into account finite repair and maintenance durations as well as costs due to testing, repair, maintenance and lost production or accidents. For normally operating units the time-related penalty is loss of production. For standby safety equipment it is the expected cost of an accident that can happen when the component is down due to a dormant failure, repair or maintenance. The objective of maintenance optimization is to minimize the total cost rate by proper selection of two intervals, one for inspections and one for replacements. General conditions and techniques are developed for solving optimal test and maintenance intervals, with and without constraints on the production loss or accident rate. Insights are gained into how the optimal intervals depend on various cost parameters and reliability characteristics

  15. Cost optimization of the dimensions of the antennas of a solar power satellite system

    Energy Technology Data Exchange (ETDEWEB)

    Vasilev, A.V.; Klassen, V.I.; Laskin, N.N.; Tobolev, A.K.

    1983-05-01

    The problem of the cost optimization of the dimensions of the antennas of a solar power satellite system is formulated. The optimization problem is twofold: (1) for a given power delivered to the microwave transmitting antenna (TA), to determine the dimensions Lt (the characteristic dimension of the TA) and Lr (the characteristic dimension of the rectenna) which minimize the unit-power cost function for a given amplitude-phase distribution in the aperture of the TA, and (2) for a power delivered to the TA which is proportional to the aperture area, to determine the dimensions Lt and Lr which minimize the unit-power cost function for a given amplitude-phase distribution in the aperture of the TA. Two possible variants of the solution of this problem are considered: (1) the case of a linear antenna (the two-dimensional problem), and (2) the case of square apertures (the three-dimensional problem). A specific example of optimization is considered, where the cost of the TA is $1000/sq m and the cost of the rectenna is $12/sq m. 11 references.

  16. 14 CFR 25.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 25.1142... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Powerplant Controls and Accessories § 25.1142 Auxiliary power unit controls. Means must be provided on the flight deck for starting...

  17. 14 CFR 29.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 29.1142... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Powerplant Controls and Accessories § 29.1142 Auxiliary power unit controls. Means must be provided on the flight deck for starting...

  18. Market power and state costs of HIV/AIDS drugs.

    Science.gov (United States)

    Leibowitz, Arleen A; Sood, Neeraj

    2007-03-01

    We examine whether U.S. states can use their market power to reduce the costs of supplying prescription drugs to uninsured and underinsured persons with HIV through a public program, the AIDS Drug Assistance Program (ADAP). Among states that purchase drugs from manufacturers and distribute them directly to clients, those that purchase a greater volume pay lower average costs per prescription. Among states depending on retail pharmacies to distribute drugs and then claiming rebates from manufacturers, those that contract with smaller numbers of pharmacy networks have lower average costs. Average costs per prescription do not differ between the two purchase methods.

  19. Cogeneration Power Plants: a Proposed Methodology for Unitary Production Cost

    International Nuclear Information System (INIS)

    Metalli, E.

    2009-01-01

    A new methodology to evaluate unitary energetic production costs in the cogeneration power plants is proposed. This methodology exploits the energy conversion factors fixed by Italian Regulatory Authority for Electricity and Gas. So it allows to settle such unitary costs univocally for a given plant, without assigning them a priori subjective values when there are two or more energy productions at the same time. Moreover the proposed methodology always ensures positive values for these costs, complying with the total generation cost balance equation. [it

  20. High Input Voltage, Silicon Carbide Power Processing Unit Performance Demonstration

    Science.gov (United States)

    Bozak, Karin E.; Pinero, Luis R.; Scheidegger, Robert J.; Aulisio, Michael V.; Gonzalez, Marcelo C.; Birchenough, Arthur G.

    2015-01-01

    A silicon carbide brassboard power processing unit has been developed by the NASA Glenn Research Center in Cleveland, Ohio. The power processing unit operates from two sources: a nominal 300 Volt high voltage input bus and a nominal 28 Volt low voltage input bus. The design of the power processing unit includes four low voltage, low power auxiliary supplies, and two parallel 7.5 kilowatt (kW) discharge power supplies that are capable of providing up to 15 kilowatts of total power at 300 to 500 Volts (V) to the thruster. Additionally, the unit contains a housekeeping supply, high voltage input filter, low voltage input filter, and master control board, such that the complete brassboard unit is capable of operating a 12.5 kilowatt Hall effect thruster. The performance of the unit was characterized under both ambient and thermal vacuum test conditions, and the results demonstrate exceptional performance with full power efficiencies exceeding 97%. The unit was also tested with a 12.5kW Hall effect thruster to verify compatibility and output filter specifications. With space-qualified silicon carbide or similar high voltage, high efficiency power devices, this would provide a design solution to address the need for high power electric propulsion systems.

  1. Capital cost: pressurized water reactor plant. Commercial electric power cost studies

    Energy Technology Data Exchange (ETDEWEB)

    1977-06-01

    The investment cost study for the 1139 MW(e) pressurized water reactor (PWR) central station power plant consists of two volumes. This volume contains the drawings, equipment list and site description.

  2. Capital cost: pressurized water reactor plant. Commercial electric power cost studies

    International Nuclear Information System (INIS)

    1977-06-01

    The investment cost study for the 1139 MW(e) pressurized water reactor (PWR) central station power plant consists of two volumes. This volume contains the drawings, equipment list and site description

  3. Energy efficiency of computer power supply units - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Aebischer, B. [cepe - Centre for Energy Policy and Economics, Swiss Federal Institute of Technology Zuerich, Zuerich (Switzerland); Huser, H. [Encontrol GmbH, Niederrohrdorf (Switzerland)

    2002-11-15

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the efficiency of computer power supply units, which decreases rapidly during average computer use. The background and the purpose of the project are examined. The power supplies for personal computers are discussed and the testing arrangement used is described. Efficiency, power-factor and operating points of the units are examined. Potentials for improvement and measures to be taken are discussed. Also, action to be taken by those involved in the design and operation of such power units is proposed. Finally, recommendations for further work are made.

  4. Estimating generation costs for wind power production in France

    International Nuclear Information System (INIS)

    Benazet, J.F.; Probert, E.J.

    1997-01-01

    Wind power is being exploited in several European countries as one of a possible number of sources of renewable energy. However, in France there is a heavy reliance on nuclear and hydro-electric power and the potential of wind power as part of the energy mix has been virtually ignored. One of the reasons advanced for the under utilisation of this technology is that it is financially unattractive. In this paper the contribution which wind power could potentially make to overall power production levels in France is examined. A cost estimate model is developed which derives electricity generation costs and determines realistic levels of production for the future. The model automatically determines the associated number of wind turbines required and the geographical areas in which they should be located. (author)

  5. Costs of magnets for large fusion power reactors: Phase I, cost of superconductors for dc magnets

    International Nuclear Information System (INIS)

    Powell, J.R.

    1972-01-01

    Projections are made for dc magnet conductor costs for large fusion power reactors. A mature fusion economy is assumed sometime after 2000 A. D. in which approximately 90,000 MW(e) of fusion reactors are constructed/year. State of the art critical current vs. field characteristics for superconductors are used in these projections. Present processing techniques are used as a basis for the design of large plants sized to produce approximately one-half of the conductor needed for the fusion magnets. Multifilamentary Nb-Ti, Pb-Bi in glass fiber, GE Nb 3 Sn tape, Linde plasma sprayed Nb 3 Sn tape, and V 3 Ga tape superconductors are investigated, together with high purity aluminum cryoconductor. Conductor costs include processing costs [capital (equipment plus buildings), labor, and operating] and materials costs. Conductor costs are compared for two sets of material costs: current (1971 A. D.) costs, and projected (after 2000 A. D.) costs. (U.S.)

  6. A new Finnish nuclear power unit

    International Nuclear Information System (INIS)

    2004-01-01

    In Finland, nuclear power is considered a natural part of a sustainable energy system. The Finnish Parliament has decided that development of nuclear power is consistent with the overall interests of society when climate issues, environmental targets, supply security and stable and competitive prices of electric power are considered as a whole. In 2002, the Finnish Parliament approved the Government's decision in principle to build a fifth nuclear power plant. The new project is the most advanced energy project in the Nordic countries with respect to the availability of energy free of carbon dioxide. The decision is also welcomed by the EU. The new reactor will be of the EPR (European Pressurized Water Reactor) type. In addition to supplying power to the Finnish industries, the plant is considered necessary if Finland is to comply with international conventions on CO 2 emissions

  7. Wind power costs expected to decrease due to technological progress

    International Nuclear Information System (INIS)

    Williams, Eric; Hittinger, Eric; Carvalho, Rexon; Williams, Ryan

    2017-01-01

    The potential for future cost reductions in wind power affects adoption and support policies. Prior analyses of cost reductions give inconsistent results. The learning rate, or fractional cost reduction per doubling of production, ranges from −3% to +33% depending on the study. This lack of consensus has, we believe, contributed to high variability in forecasts of future costs of wind power. We find that learning rate can be very sensitive to the starting and ending years of datasets and the geographical scope of the study. Based on a single factor experience curve that accounts for capacity factor gains, wind quality decline, and exogenous shifts in capital costs, we develop an improved model with reduced temporal variability. Using a global adoption model, the wind-learning rate is between 7.7% and 11%, with a preferred estimate of 9.8%. Using global scenarios for future wind deployment, this learning rate range implies that the cost of wind power will decline from 5.5 cents/kWh in 2015 to 4.1–4.5 cents/kWh in 2030, lower than a number of other forecasts. If attained, wind power may be the cheapest form of new electricity generation by 2030, suggesting that support and investment in wind should be maintained or expanded. - Highlights: • Expectations for cost reductions in wind power is important for policy. • Wind learning rates are sensitive to data time period and regional choice. • We develop improved wind cost model with much reduced variability. • New model gives global wind learning rates between 7.7%-11%.

  8. Effects of SMES units on power system stability

    International Nuclear Information System (INIS)

    Byerly, R.T.; Juves, J.A.

    1980-01-01

    A mathematical model suitable for representing SMES units in power system stability studies has been developed and incorporated into an existing large-scale stability program. Demonstration studies have been performed which emphasize the use of SMES units to improve the damping of oscillations associated with synchronizing power flow among generators. The capability exists to conduct stability studies of large systems which include SMES units

  9. CALCULATION PECULIARITIES OF RE-PROCESSED ROAD COVERING UNIT COST

    Directory of Open Access Journals (Sweden)

    Dilyara Kyazymovna Izmaylova

    2017-09-01

    Full Text Available In the article there are considered questions of economic expediency of non-waste technology application for road covering repair and restoration. Determined the conditions of asphalt-concrete processing at plants. Carried out cost changing analysis of asphalt granulate considering the conditions of transportation and preproduction processing. Given an example of expense calculation of one conventional unit of asphalt-concrete mixture volume preparation with and without processing.

  10. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  11. Estimation of environmental external costs between coal fired power plant and nuclear power plant

    International Nuclear Information System (INIS)

    Moon, G. H.; Kim, S. S.

    2000-01-01

    First of all, this study evaluated the impacts on the health and the environment of air pollutants emitted from coal power plant and nuclear power pant, two major electric power generating options in Korea. Then, the environmental external costs of those two options were estimated by transforming the health and environment impact into monetary values. To do this, AIRPACTS and Impacts of Atmospheric Release model developed by IAEA were used. The environmental external cost of Samcheonpo coal power plant was estimated about 25 times as much as that of Younggwang nuclear power plant. This result implies that nuclear power plant is a clean technology compared with coal power plant. This study suggests that the external cost should be reflected in the electric system expansion plan in order to allocate energy resources efficiently and to reduce economic impact stemming from the environmental regulation emerged recently on a global level

  12. Reliability/Cost Evaluation on Power System connected with Wind Power for the Reserve Estimation

    DEFF Research Database (Denmark)

    Lee, Go-Eun; Cha, Seung-Tae; Shin, Je-Seok

    2012-01-01

    Wind power is ideally a renewable energy with no fuel cost, but has a risk to reduce reliability of the whole system because of uncertainty of the output. If the reserve of the system is increased, the reliability of the system may be improved. However, the cost would be increased. Therefore...... the reserve needs to be estimated considering the trade-off between reliability and economic aspects. This paper suggests a methodology to estimate the appropriate reserve, when wind power is connected to the power system. As a case study, when wind power is connected to power system of Korea, the effects...

  13. Reliability of Power Units in Poland and the World

    Directory of Open Access Journals (Sweden)

    Józef Paska

    2015-09-01

    Full Text Available One of a power system’s subsystems is the generation subsystem consisting of power units, the reliability of which to a large extent determines the reliability of the power system and electricity supply to consumers. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. They are compared and analysed on the basis of data published by the Energy Market Agency (Poland, NERC (North American Electric Reliability Corporation – USA, and WEC (World Energy Council. Deficiencies and the lack of a unified national system for collecting and processing electric power equipment unavailability data are also indicated.

  14. Projected costs of generating electricity from power stations for commissioning in the period 1995-2000

    International Nuclear Information System (INIS)

    1989-01-01

    The study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commissioned in the mid-1990s, or shortly thereafter, although not all countries plan to commission plants at that time. The major changes in expectations compared with earlier studies, apart from those associated with changed perceptions of fossil fuel prices, include significantly lower nuclear investment costs for the United States, associated with an improved design and the expectation of achieving shorter construction periods than projected in the 1985 study, and generally lower nuclear fuel costs. Some countries project higher operation and maintenance costs for either coal-fired or nuclear plant or both. In the case of coal-fired plants these may be associated with the extra costs of operating desulphurisation equipment. The most marked change in nuclear operating and maintenance costs has taken place in the United States, where these costs are now expected to be twice as large as the projected nuclear fuel costs. There remain major differences in investment cost expectations between countries. The reasons for these differences have been examined in previous studies. They arise from differences in factor costs, regulatory approach, design and siting, and exchange rates which do not adequately reflect the differences in the capital investment costs between countries. In brief, most OECD countries continue to expect nuclear power to have a lower levelised generating cost than coal-fired generation when using their own technical and economic assumptions

  15. Present state of electric power business in United States and Europe

    International Nuclear Information System (INIS)

    Onishi, Kenichi

    2011-01-01

    This article reported present state of nuclear power and electric power business in United States and Europe after Fukushima Daiichi Accident. As for the trend of demand and supply of electric power and policy, the accident forced Germany possibly to proceed with phase-out of nuclear power, but France and United States to sustain nuclear power with no great change of energy policy at this moment. As for the trend of electric power market, there was not state in United States with liberalized retail market of electric power after rolling blackouts occurred in California State in the early 2000s. In Germany proceeding with renewable energy introduction, renewable electricity fed into the grid was paid for by the network operators at fixed tariffs and the costs passed on to electricity consumers were increasing. Renewable Portfolio Standards (RPS) in United States forced the state to introduction of renewable energy to some ratio, and Feed-in Tariff (FIT) introduced in EU in 1990s lead to introduction of a large amount of renewable electricity targeted in 2020. Huge amount of wind power introduction brought about several problems to solve such that excess electric power above domestic demand had bad effects on grids in neighboring region. Enforcement of power transmission lines was also needed with increase of maximum electric power as well as introduction of a large amount of renewable electricity. (T. Tanaka)

  16. Reduction of wind powered generator cost by use of a one bladed rotor

    Energy Technology Data Exchange (ETDEWEB)

    Pruyn, R R; Wiesner, W; Ljungstroem, O [ed.

    1976-01-01

    Cost analysis supported by preliminary design studies of one and two bladed wind powered generator units shows that a 30% reduction in acquisition cost can be achieved with a one bladed design. Designs studied were sized for an output power of 1000 kilowatts. The one bladed design has the potential for reducing acquisition cost to $680 per available kilowatt if the unit is located in a region with mean surface winds of 15 mph. Vibratory loads of the one bladed design are significant and will require considerable design attention. The one per rev Coriolis torque caused by blade flapping is the most significant problem. The major source of blade flapping will be the velocity gradient of the ground boundary layer. A torsional vibration isolating coupling may be required in the generator drive to reduce the loads due to this vibratory torque. An inclined flapping hinge also is desirable to cause pitch-flap coupling that will suppress blade flap motions.

  17. Power Efficient Division and Square Root Unit

    DEFF Research Database (Denmark)

    Liu, Wei; Nannarelli, Alberto

    2012-01-01

    Although division and square root are not frequent operations, most processors implement them in hardware to not compromise the overall performance. Two classes of algorithms implement division or square root: digit-recurrence and multiplicative (e.g., Newton-Raphson) algorithms. Previous work....... The proposed unit is compared to similar solutions based on the digit-recurrence algorithm and it is compared to a unit based on the multiplicative Newton-Raphson algorithm....

  18. The comparative costs of nuclear and fossil fuelled power plants in an American electricity utility

    International Nuclear Information System (INIS)

    Corey, G.R.

    1984-01-01

    This chapter compares the current and historic operating performances of twelve large nuclear and coal-fired units now operated by Commonwealth Edison Company, and provides specific comparison of bus-bar costs of electricity generated by those units in recent years. It also provides cost comparisons for future nuclear and coal-fired units and attempts to deal realistically with the effect of future inflation upon these comparisons. The chapter attempts to deal responsibly with the problem of uncertainty - how present-day comparisons may be affected by future developments and how my own published comparisons have varied over the past four or five years. The conclusion is reached that, given the uncertain world in which we live, no electric power supplier can afford to put all its eggs in one basket. Utility managers have a strong incentive to diversify their sources of power generation, and society as a whole would do well to encourage such diversification. (author)

  19. Reduction of capital costs of nuclear power plants. NEA-report

    International Nuclear Information System (INIS)

    2000-01-01

    Since the the mid-1980s, the declining real prices of fossil fuels and the significant improvements in thermal efficiencies of combined cycle power plants have eroded the economic competitiveness of nuclear power plants in most OECD countries. In order for nuclear power to remain a viable option for the next millennium, the cost of electricity from nuclear power plant must be greatly reduced to be competitive with alternative sources. Of the three major components of nuclear generation cost - capital, O and M and fuel - the capital cost component makes up approximately 60 per cent of the total. Therefore, identification of the means to reduce the capital costs of nuclear power plants is a high priority activity toward keeping nuclear power competitive. Among a number of capital cost reduction measures, the principal ones were agreed by the expert group as follows: Increased plant size, improved construction methods, reduced construction schedule, design improvement, improved procurement, organisation and contractual aspects, standardisation and construction in series, multiple unit construction, regulatory and policy reform. (orig.)

  20. Costs for frequency reserve and regulation power options in Iceland

    International Nuclear Information System (INIS)

    2005-01-01

    The price for ancillary services that ensures an efficient use of resources is equal to the marginal costs of providing these services. In an expanding hydro power system there are two optimal designs for expansion; one design is optimal when ancillary services are not to be provided and another design is optimal when these services are to be provided. The right price for ancillary services cover the net difference in costs between the two designs. The difference in design in an expanding system is specific for that particular system and hence no general number can be specified. In an expanding hydro power system, the efficient price typically covers parts of the marginal investment costs for excess capacity in turbine and generator, but no investment costs for waterways and reservoirs

  1. A Deterministic and Probabilistic Cost Estimate for Nuclear Power Plants

    International Nuclear Information System (INIS)

    Ha, Gag Kyeon; Kwon, Jong Jooh

    2005-01-01

    There are many cost estimate methodologies for some future projects. Revenue Requirement Method (RRM), Cost/Benefit Ratio method, Return on Investment, Pay Back Period Method. etc. This paper uses the RRM method which is the amount of revenue that must be collected from customers to compensate a utility for all expenditures associated with implementing an alternative decision involving money. This RRM can be combined with a random sampling statistical simulation computer program to calculated the Probability Distribution Functions(PDF) of the cost elements for generating cost. EPRI developed this combined statistical techniques into RRM, named Statistical Revenue Requirement Method(SRRM). The statistical technique is a random sampling statistical simulation. The simulation tool is usually Monte Carlo sampling, Latin Latin Hypercube sampling, etc. SRRM is used to estimating for future power plants, apartments, hospital, marketing, etc. In this paper, RRM calculation and SRRM simulation have been practiced for PWR1400MWe nuclear power plants

  2. A Probability Analysis of the Generating Cost for EU-APR1400 Single Unit

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Gak Hyeon; Kim, Sung Hwan [KHNP CRI, Seoul (Korea, Republic of)

    2014-10-15

    The nuclear power plant market is expected to grow rapidly in order to address issues of global warming, reducing CO{sub 2} emissions and securing stable electricity supplies. Under these circumstances, the main primary goal of the EU-APR100 development is to ensure export competitiveness in the European countries. To this end, EU-APR1400 have been developed based one te APR1400 (Advanced Power Reactor, GEN Type) The EU-APR1400 adds many advanced design features to its predecessor, as outlined below in Table 1. In this simulation, the results of the generating cost of the EU-APR1400 single unit were determined using the probability cost analysis technique, the generating cost range was shown to be 56.16 ∼ 70.92 won/kWh.

  3. A Probability Analysis of the Generating Cost for EU-APR1400 Single Unit

    International Nuclear Information System (INIS)

    Ha, Gak Hyeon; Kim, Sung Hwan

    2014-01-01

    The nuclear power plant market is expected to grow rapidly in order to address issues of global warming, reducing CO 2 emissions and securing stable electricity supplies. Under these circumstances, the main primary goal of the EU-APR100 development is to ensure export competitiveness in the European countries. To this end, EU-APR1400 have been developed based one te APR1400 (Advanced Power Reactor, GEN Type) The EU-APR1400 adds many advanced design features to its predecessor, as outlined below in Table 1. In this simulation, the results of the generating cost of the EU-APR1400 single unit were determined using the probability cost analysis technique, the generating cost range was shown to be 56.16 ∼ 70.92 won/kWh.

  4. Application of CFB technology for large power generating units and CO2 capture

    International Nuclear Information System (INIS)

    Ryabov, G. A.; Folomeev, O. M.; Sankin, D. A.; Khaneev, K. V.; Bondarenko, I. G.; Mel'nikov, D. A.

    2010-01-01

    Data on the development of the circulating fluidized bed (CFB) technology for combustion of fuels in large power generating units are examined. The problems with raising the steam parameters and unit power of boilers with a circulating fluidized bed are examined. With the boiler system at the 460 MW unit at Lagisza (Poland) as an example, the feasibility of raising the efficiency of units with CFB boilers through deep recovery of the heat of the effluent gases and reducing expenditure for in-house needs is demonstrated. Comparative estimates of the capital and operating costs of 225 and 330 MW units are used to determine the conditions for optimum use of CFB boilers in the engineering renovation of thermal power plants in Russia. New areas for the application of CFB technology in CO 2 capture are analyzed in connection with the problem of reducing greenhouse gas emissions.

  5. Power generation scenarios for Nigeria: An environmental and cost assessment

    International Nuclear Information System (INIS)

    Gujba, H.; Mulugetta, Y.; Azapagic, A.

    2011-01-01

    Exploratory scenarios for the power sector in Nigeria are analysed in this paper using possible pathways within the Nigerian context and then compared against the Government's power expansion plan in the short to medium term. They include two fossil-fuel (FF and CCGT) and two sustainable-development-driven scenarios (SD1 and SD2). The results from the FF scenarios indicate this is the preferred outcome if the aim is to expand electricity access at the lowest capital costs. However, the annual costs and environmental impacts increase significantly as a consequence. The SD1 scenario, characterised by increased penetration of renewables, leads to a reduction of a wide range of environmental impacts while increasing the annual costs slightly. The SD2 scenario, also with an increased share of renewables, is preferred if the aim is to reduce GHG emissions; however, this comes at an increased annual cost. Both the SD1 and SD2 scenarios also show significant increases in the capital investment compared to the Government's plans. These results can be used to help inform future policy in the Nigerian electricity sector by showing explicitly the range of possible trade-offs between environmental impacts and economic costs both in the short and long terms. - Research Highlights: →The power sector in Nigeria is set to grow significantly in near future. →Power sector scenarios are constructed and studied using LCA and economic analysis methods and then compared against the Government's plans. →These include two fossil-fuel and two sustainable-development-driven scenarios. →The results explicitly show the trade-offs between environmental impacts and costs. →Following the fossil fuel paths will reduce capital costs but increase environmental impacts. The renewable energy paths will reduce some environmental impacts but increase the capital costs.

  6. Electric plant cost and power production expenses 1990

    International Nuclear Information System (INIS)

    1992-06-01

    Electric Plant Cost and Power Production Expenses is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA); US Department of Energy. This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, Federal, State, and local governments, and the general public. These data are collected and published to fulfill data collection and dissemination responsibilities of the Energy Information Administration (EIA), as specified in the Federal Energy Administration Act (Public Law 93-275), as amended

  7. Electric plant cost and power production expenses 1991

    International Nuclear Information System (INIS)

    1993-01-01

    Electric Plant Cost and Power Production Expenses is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels (CNEAF); Energy Information Administration (EIA); US Department of Energy. This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, Federal, State, and local governments, and the general public. These data are collected and published to fulfill data collection and dissemination responsibilities of the Energy Information Administration (EIA), as specified in the Federal Energy Administration Act (Public Law 93-275), as amended

  8. Improving Power System Modeling. A Tool to Link Capacity Expansion and Production Cost Models

    Energy Technology Data Exchange (ETDEWEB)

    Diakov, Victor [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cole, Wesley [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sullivan, Patrick [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brinkman, Gregory [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-11-01

    Capacity expansion models (CEM) provide a high-level long-term view at the prospects of the evolving power system. In simulating the possibilities of long-term capacity expansion, it is important to maintain the viability of power system operation in the short-term (daily, hourly and sub-hourly) scales. Production-cost models (PCM) simulate routine power system operation on these shorter time scales using detailed load, transmission and generation fleet data by minimizing production costs and following reliability requirements. When based on CEM 'predictions' about generating unit retirements and buildup, PCM provide more detailed simulation for the short-term system operation and, consequently, may confirm the validity of capacity expansion predictions. Further, production cost model simulations of a system that is based on capacity expansion model solution are 'evolutionary' sound: the generator mix is the result of logical sequence of unit retirement and buildup resulting from policy and incentives. The above has motivated us to bridge CEM with PCM by building a capacity expansion - to - production cost model Linking Tool (CEPCoLT). The Linking Tool is built to onset capacity expansion model prescriptions onto production cost model inputs. NREL's ReEDS and Energy Examplar's PLEXOS are the capacity expansion and the production cost models, respectively. Via the Linking Tool, PLEXOS provides details of operation for the regionally-defined ReEDS scenarios.

  9. Flexible and Cost Efficient Power Consumption using Economic MPC

    DEFF Research Database (Denmark)

    Hovgaard, Tobias Gybel; Larsen, Lars F.S.; Jørgensen, John Bagterp

    2011-01-01

    the formulation of a new cost function for our proposed power management. Hereby the refrigeration system is enabled to contribute with ancillary services to the balancing power market. Since significant amounts of regulating power is needed for a higher penetration of intermittent renewable energy sources...... such as wind turbines this feature is in high demand in a future intelligent power grid (Smart Grid). Our perspective is seen from the refrigeration system but as it is demonstrated the involvement in the balancing market can be economically beneficial for the system itself while delivering crucial services...... that reduces operation costs by utilizing the thermal storage capabilities. In the study we specifically address advantages coming from daily variations in outdoor temperature and electricity prices but other aims such as peak load reduction are also considered. An important contribution of this paper is also...

  10. Diffusion of nuclear power generation in the United States

    International Nuclear Information System (INIS)

    Sommers, P.E.

    1978-01-01

    This dissertation is a study of nuclear power as an innovation diffusing through the utility industry in the United States. Chapter 1 notes that the industry studied, the innovation and the diffusion process have several characteristics not typical of the classical diffusion of innovations literature in economics. Uncertainty about the true characteristics of the innovation persists well into the diffusion process. The characteristics of the innovation appear to change over time. Thus the classic S-shaped transition path from the old, pre-innovation equilibrium to a new post-diffusion equilibrium is not found for this innovation and this industry. A generalized diffusion model is developed in Chapter 1 which allows these peculiarities of the utility industry and of nuclear power to be taken into account. Chapter 2 traces the development of the innovation, the consequences of the demonstration plant program, and the history of the diffusion process from 1963 to the present. Chapter 3 analyses the structure and sources and consequences of regulation of the industry. Chapter 4 develops a logit discrete choice model of the adoption decision. Chapter 5 investigates the determinants of the proportion of industry output provided by nuclear plants using a modified version of the Baughman--Joskow Regional Electricity Model. Salient aspects of uncertainty shift the expected average cost of nuclear plant output in the modified model

  11. Wind power planning: assessing long-term costs and benefits

    International Nuclear Information System (INIS)

    Kennedy, Scott

    2005-01-01

    In the following paper, a new and straightforward technique for estimating the social benefit of large-scale wind power production is presented. The social benefit is based upon wind power's energy and capacity services and the avoidance of environmental damages. The approach uses probabilistic load duration curves to account for the stochastic interaction between wind power availability, electricity demand, and conventional generator dispatch. The model is applied to potential offshore wind power development to the south of Long Island, NY. If natural gas combined cycle and integrated gasifier combined cycle (IGCC) are the alternative generation sources, wind power exhibits a negative social benefit due to its high capacity cost and the relatively low emissions of these advanced fossil-fuel technologies. Environmental benefits increase significantly if charges for CO 2 emissions are included. Results also reveal a diminishing social benefit as wind power penetration increases. The dependence of wind power benefits on CO 2 charges, and capital costs for wind turbines and IGCC plant is also discussed. The methodology is intended for use by energy planners in assessing the social benefit of future investments in wind power

  12. Dynamic modeling and simulation of power transformer maintenance costs

    Directory of Open Access Journals (Sweden)

    Ristić Olga

    2016-01-01

    Full Text Available The paper presents the dynamic model of maintenance costs of the power transformer functional components. Reliability is modeled combining the exponential and Weibull's distribution. The simulation was performed with the aim of corrective maintenance and installation of the continuous monitoring system of the most critical components. Simulation Dynamic System (SDS method and VENSIM PLE software was used to simulate the cost. In this way, significant savings in maintenance costs will be achieved with a small initial investment. [Projekat Ministarstva nauke Republike Srbije, br. III 41025 i br. OI 171007

  13. The long-term power purchase: Recovery of capacity costs

    International Nuclear Information System (INIS)

    Cross, P.S.

    1990-01-01

    As electric utilities increase their reliance on the long-term power purchase as an alternative to utility-owned generation, the appropriate rate treatment of the costs established in the purchase agreement assumes growing importance. In the November 9, 1989, issue, the authors examined the recent trend among state regulators to treat the long-term purchase in a manner similar to the addition by a utility of a new plant, including a full-scale prudence review. This installment will review recent rulings on the related issue of rate recovery of long-term capacity costs through the fuel cost adjustment clause

  14. The real costs of nuclear power in the UK

    International Nuclear Information System (INIS)

    Jeffery, J.W.

    1980-01-01

    The UK Central Electricity Generating Board (CEGB) has recently published figures which appear to show that nuclear generated electricity is 20% cheaper than electricity from coal stations. It is argued here that these figures cannot be used to make a case for nuclear power since they are based on an accounting convention which fails to give due consideration to inflation. In effect the convention used assumes that capital costs are paid in depreciated currency and become an artificially small part of total operating costs. By suitably adjusting the CEGB figures the author aims to provide a more realistic comparison of generating costs. (author)

  15. Guidelines for estimating nuclear power plant decommissioning costs

    International Nuclear Information System (INIS)

    LaGuardia, T.S.; Williams, D.H.

    1989-01-01

    The objectives of the study were: (1) To develop guidelines to facilitate estimating the cost of nuclear power plant decommissioning alternatives on a plant-specific basis and to facilitate comparing estimates made by others. The guidelines are expressed in a form that could be readily adapted by technical specialists from individual utilities or by other uses. (2) To enhance the industry's credibility with decision-makes at the state and federal levels during rate/regulatory processes involving decommissioning costs. This is accomplished by providing a detailed, systematic breakdown of how decommissioning cost estimates are prepared. (3) To increase the validity, realism, and accuracy of site-specific decommissioning cost estimates. This is accomplished by pulling together the experiences and practices of several nuclear utilities and consultants in conducting past decommissioning cost estimates

  16. External costs of material recycling strategies for fusion power plants

    International Nuclear Information System (INIS)

    Hallberg, B.; Aquilonius, K.; Lechon, Y.; Cabal, H.; Saez, R.M.; Schneider, T.; Lepicard, S.; Ward, D.; Hamacher, T.; Korhonen, R.

    2003-01-01

    This paper is based on studies performed within the framework of the project Socio-Economic Research on Fusion (SERF3). Several fusion power plant designs (SEAFP Models 1-6) were compared focusing on part of the plant's life cycle: environmental impact of recycling the materials. Recycling was considered for materials replaced during normal operation, as well as materials from decommissioning of the plant. Environmental impact was assessed and expressed as external cost normalised with the total electrical energy output during plant operation. The methodology used for this study has been developed by the Commission of the European Union within the frame of the ExternE project. External costs for recycling, normalised with the energy production during plant operation, are very low compared with those for other energy sources. Results indicate that a high degree of recycling is preferable, at least when considering external costs, because external costs of manufacturing of new materials and disposal costs are higher

  17. Transmission pricing and stranded costs in the electric power industry

    International Nuclear Information System (INIS)

    Baumol, W.J.; Sidak, J.G.

    1995-09-01

    Stranded costs are those costs that electric utilities are currently permitted to recover through their rates but whose recovery may be impeded or prevented by the advent of competition in the industry. Estimates of these costs run from the tens to the hundreds of billions of dollars. Should regulators permit utilities to recover stranded costs while they take steps to promote competition in the electric power industry. William Baumol and J. Gregory Sidak argue that answer to that question should be yes.The authors show that a transmission price, the price for sending electricity over the transmission grid, can be determined in a manner that is compatible with economic efficiency and clearly neutral in its effects upon all competitors in electricity generation. A correctly constructed regime of transmission pricing may in fact achieve the efficiency and equity goals that justify the recovery of stranded costs

  18. Mochovce power plant units 3 and 4

    International Nuclear Information System (INIS)

    Cuba, J.

    2003-01-01

    The report gives the basic technical data and history of the construction of the units 3 and 4 of the Mochovce NPP.The current status of the units completion according to the original plan is: civil part - 70%; mechanical part - 30%; electric and IC equipment - 1%. Strategic plan for the preservation of the units 3 and 4 has been developed in accordance with TECDOC-1110. In implementation of the plan preservation activities are performed for the components located and built-in on the site and in storehouses. Preservation with dryers and protective coatings is applied. The factors of possible component degradation are determined. Ventilation components are used for improving the climate conditions in the primary part of the reactor building. Temperature and humidity measurements are done and temperature control is set. Special pre-service inspections beyond the basic scope of preservation and protection works are conducted of steam generator and reactor pressure vessel. The implementation of the design data protection and enhancement is discussed. The feasibility study of units 3 and 4 completion funding has been developed in 2002

  19. Preparing nuclear power plant units for operation

    International Nuclear Information System (INIS)

    Hudcovic, R.; Telgarsky, K.; Kmosena, J.

    1984-01-01

    The factors are listed which have to be taken into consideration for planning the unit operation, i.e., the implementation of planned repairs, checks of equipment and refuellings. All basic input data were evaluated as the basic for drawing up the schedule of routine repairs and overhauls for the coming period. (E.S.)

  20. Internalization of external costs for nuclear power in Romania

    International Nuclear Information System (INIS)

    Andrei, Veronica; Ghita, Sorin; Ionita, Gheorghe; Gheorghe-Sorescu, Antonius; Glodeanu, Florin

    2006-01-01

    A technology that competes against alternatives on a full cost basis is not sustainable - no matter how environmentally friendly is. Competitive performance, however, means more than lower costs. Additional factors as the following have to be considered as criteria ensuring a sustainable energy development: - environmentally compatibility - intergenerational compatibility - power demand compatibility - socio-political compatibility - geopolitical compatibility. Some factors are less difficult to express in al.) Recent Cold Fterms (e.g. the economic value of degraded public health) than others (e.g. the economic value of reliable supplies or lack of public acceptance) but their quantifications are fraught with uncertainty, vary greatly from location to location and cannot be generalized. Still, these factors often tilt the balance in favor or disfavor of a particular technology. From a public perspective, a set of costs called 'external costs' are important. By definition these costs are external to standard private sector cost accounting schemes. They are necessarily paid for, not as a cost of doing business, but by society. The concept of externalities has been referred to in the economic literature since early in the 20th century. In 1974, the Council of OECD recommended the application by governments of the 'Polluter Pays Principle', defined in the early 1970s as a means to allocate costs of pollution prevention and control measures to pollutants, and thereby to consumers of their products, rather than to society as a whole. The externality may be defined as 'a cost or benefit that is not included in the market price of a commodity because it is not included in the supply price or demand price. An externality is produced when the economic activity of one actor (or group of actors) has a positive or negative impact on the welfare function of another actor (or group of actors) and when the former fails to be fully compensated, or to fully compensate the latter

  1. User instructions for levelized power generation cost codes using an IBM-type PC

    International Nuclear Information System (INIS)

    Coen, J.J.; Delene, J.G.

    1989-01-01

    Programs for the calculation of levelized power generation costs using an IBM or compatible PC are described. Cost calculations for nuclear plants and coal-fired plants include capital investment cost, operation and maintenance cost, fuel cycle cost, decommissioning cost, and total levelized power generation cost. 7 refs., 36 figs., 4 tabs

  2. Nuclear power programmes in developing countries: Costs and financing

    International Nuclear Information System (INIS)

    Charpentier, J.P.; Bennett, L.L.

    1985-01-01

    This article refers to a seminar (organized by the IAEA) on Costs and Financing of Nuclear Power Programmes in Developing Countries held in Vienna from 9-12 September 1985. Its main objective was to promote a dialogue among the various parties involved in the domain of nuclear power financing, i.e. buyers, suppliers and financing organizations. At the meeting the Agency presented information showing that nuclear power plants are an economic means of generating electricity. In relation hereto the article deals with such topics as performance records, economic records, projected nuclear plant additions, financing constraints, current debt problems and new working relationships

  3. Wind Power: How Much, How Soon, and At What Cost?

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan H; Hand, Maureen

    2010-01-01

    The global wind power market has been growing at a phenomenal pace, driven by favorable policies towards renewable energy and the improving economics of wind projects. On a going forward basis, utility-scale wind power offers the potential for significant reductions in the carbon footprint of the electricity sector. Specifically, the global wind resource is vast and, though accessing this potential is not costless or lacking in barriers, wind power can be developed at scale in the near to medium term at what promises to be an acceptable cost.

  4. Stochastic PSO-based heat and power dispatch under environmental constraints incorporating CHP and wind power units

    Energy Technology Data Exchange (ETDEWEB)

    Piperagkas, G.S.; Anastasiadis, A.G.; Hatziargyriou, N.D. [National Technical University of Athens, School of Electrical and Computer Engineering, Electric Power Division, 9, Iroon Polytechneiou Str., GR-15773 Zografou, Athens (Greece)

    2011-01-15

    In this paper an extended stochastic multi-objective model for economic dispatch (ED) is proposed, that incorporates in the optimization process heat and power from CHP units and expected wind power. Stochastic restrictions for the CO{sub 2}, SO{sub 2} and NO{sub x} emissions are used as inequality constraints. The ED problem is solved using a multi-objective particle swarm optimization technique. The available wind power is estimated from a transformation of the wind speed considered as a random variable to wind power. Simulations are performed on the modified IEEE 30 bus network with 2 cogeneration units and actual wind data. Results concerning minimum cost and emissions reduction options are finally drawn. (author)

  5. Network cost in transmission and distribution of electric power

    International Nuclear Information System (INIS)

    Lindahl, A.; Naeslund, B.; Oettinger-Biberg, C.; Olander, H.; Wuolikainen, T.; Fritz, P.

    1994-01-01

    This report is divided in two parts, where part 1 treats the charges on the regional nets with special emphasis on the net owners tariffs on a deregulated market. Part 2 describes the development of the network costs in electric power distribution for the period 1991-1993. 11 figs, 33 tabs

  6. The costs of power outages: A case study from Cyprus

    International Nuclear Information System (INIS)

    Zachariadis, Theodoros; Poullikkas, Andreas

    2012-01-01

    We study the costs of electricity disruptions in Cyprus, which suffered severe power shortages in summer 2011 after an explosion that destroyed 60% of its power generating capacity. We employ both economic and engineering approaches to assess these costs. Among other calculations, we provide estimates of the value of lost load by economic sector and the hourly value of electricity by season and type of day. The results of two economic methods employed to assess welfare losses differ largely, indicating that the assessment of outage costs is associated with many uncertainties. Our calculations show that the emergency actions taken by national energy authorities in response to that accident, though not necessarily optimal, have generally been appropriate and in line with international best practices: the additional costs incurred due to these measures are lower than the economic losses avoided thanks to these actions. Preferential treatment of specific consumer types in the case of repeated power outages remains an open policy question. - Highlights: ► We evaluate the response of energy authorities to a sudden electricity crisis. ► We combine two top-down economic methods and a bottom-up engineering approach. ► We estimate the value of lost electricity by hour, day type and season. ► The response of energy authorities turned out to be effective. ► Costs of emergency actions were lower than the economic losses avoided.

  7. Universal power transistor base drive control unit

    Science.gov (United States)

    Gale, Allan R.; Gritter, David J.

    1988-01-01

    A saturation condition regulator system for a power transistor which achieves the regulation objectives of a Baker clamp but without dumping excess base drive current into the transistor output circuit. The base drive current of the transistor is sensed and used through an active feedback circuit to produce an error signal which modulates the base drive current through a linearly operating FET. The collector base voltage of the power transistor is independently monitored to develop a second error signal which is also used to regulate base drive current. The current-sensitive circuit operates as a limiter. In addition, a fail-safe timing circuit is disclosed which automatically resets to a turn OFF condition in the event the transistor does not turn ON within a predetermined time after the input signal transition.

  8. COSTING OF QUALITY IN BUSINESS BASE UNIT SEVERAL PRODUCTIONS, CIENFUEGOS

    Directory of Open Access Journals (Sweden)

    Gómez Alfonso, Elizabeth

    2013-01-01

    Full Text Available The calculation of quality costs as a component of the System of Quality Management, is a must for Cuban business managers, to provide a technique identified as an advanced instrument of management, which will lead to improved competitiveness and serve as an informative source. Identify and calculate the costs of quality, as well as propose measured plans, to promote a decrease in operating expenses, which can be used as a tool to improve processes. The Business Unit of Several Base Productions of Cienfuegos presents the fault to give way to Business Improvement and certification of its Quality Management System, according to the norm ISO 9001:2008 and the decree law 281, so that the objective research was to estimate the costs of quality processes in the company. To achieve this level were used empirical methods and techniques such as direct observation, document review and work in groups, which allowed to calculate the costs of quality in all processes. The results obtained are applicable to companies that operate in the Cuban economy and according to the Cuban economic model implemented from the year 2011.

  9. A Study on Cost Allocation in Nuclear Power Coupled with Desalination

    International Nuclear Information System (INIS)

    Lee, ManKi; Kim, SeungSu; Moon, KeeHwan; Lim, ChaeYoung

    2004-01-01

    As for a single-purpose desalination plant, there is no particular difficulty in computing the unit cost of the water, which is obtained by dividing the annual total costs by the output of fresh water. When it comes to a dual-purpose plant, cost allocation is needed between the two products. No cost allocation is needed in some cases where two alternatives producing the same water and electricity output are to be compared. In these cases, the consideration of the total cost is then sufficient. This study assumes MED (Multi-Effect Distillation) technology is adopted when nuclear power is coupled with desalination. The total production cost of the two commodities in dual-purpose plant can easily be obtained by using costing methods, if the necessary raw data are available. However, it is not easy to calculate a separate cost for each product, because high-pressure steam plant costs cannot be allocated to one or the other without adopting arbitrary methods. Investigation on power credit method is carried out focusing on the cost allocation of combined benefits due to dual production, electricity and water. The illustrative calculation is taken from Preliminary Economic Feasibility Study of Nuclear Desalination in Madura Island, Indonesia. The study is being performed by BATAN (National Nuclear Energy Agency), KAERI (Korean Atomic Energy Research Institute) and under support of the IAEA (International Atomic Energy Agency) started in the year 2002 in order to perform a preliminary economic feasibility in providing the Madurese with sufficient power and potable water for the public and to support industrialization and tourism in Madura Region. The SMART reactor coupled with MED is considered to be an option to produce electricity and potable water. This study indicates that the correct recognition of combined benefits attributable to dual production is important in carrying out economics of desalination coupled with nuclear power. (authors)

  10. Improved control system power unit for large parachutes

    Science.gov (United States)

    Chandler, J. A.; Grubbs, T. M.

    1968-01-01

    Improved control system power unit drives the control surfaces of very large controllable parachutes. The design features subassemblies for determining control surface position and cable loading, and protection of the load sensor against the possibility of damage during manipulation.

  11. Calculation of coal power plant cost on agricultural and material building impact of emission

    International Nuclear Information System (INIS)

    Mochamad Nasrullah; Wiku Lulus Widodo

    2016-01-01

    Calculation for externally cost of Coal Power Plant (CPP) is very important. This paper is focus on CPP appear SO 2 impact on agricultural plant and material building. AGRIMAT'S model from International Atomic Energy Agency is model one be used to account environmental damage for air impact because SO 2 emission. Analysis method use Impact Pathways Assessment: Determining characteristic source, Exposure Response Functions (ERF), Impacts and Damage Costs, and Monetary Unit Cost. Result for calculate shows that SO 2 that issued CPP, if value of SO 2 is 19,3 μg/m3, damage cost begins valuably positive. It shows that the land around CPP has decrease prosperity, and it will disadvantage for agricultural plant. On material building, SO 2 resulting damage cost. The increase humidity price therefore damage cost on material building will increase cost. But if concentration SO 2 increase therefore damage cost that is appear on material building decrease. Expected this result can added with external cost on health impact of CPP. External cost was done at developed countries. If it is done at Indonesia, therefore generation cost with fossil as more expensive and will get implication on issue cut back gases greenhouse. On the other side, renewable energy and also alternative energy as nuclear have opportunity at national energy mix system. (author)

  12. Major design issues of molten carbonate fuel cell power generation unit

    Energy Technology Data Exchange (ETDEWEB)

    Chen, T.P.

    1996-04-01

    In addition to the stack, a fuel cell power generation unit requires fuel desulfurization and reforming, fuel and oxidant preheating, process heat removal, waste heat recovery, steam generation, oxidant supply, power conditioning, water supply and treatment, purge gas supply, instrument air supply, and system control. These support facilities add considerable cost and system complexity. Bechtel, as a system integrator of M-C Power`s molten carbonate fuel cell development team, has spent substantial effort to simplify and minimize these supporting facilities to meet cost and reliability goals for commercialization. Similiar to other fuels cells, MCFC faces design challenge of how to comply with codes and standards, achieve high efficiency and part load performance, and meanwhile minimize utility requirements, weight, plot area, and cost. However, MCFC has several unique design issues due to its high operating temperature, use of molten electrolyte, and the requirement of CO2 recycle.

  13. Technology, safety and costs of decommissioning a reference boiling water reactor power station: Comparison of two decommissioning cost estimates developed for the same commercial nuclear reactor power station

    International Nuclear Information System (INIS)

    Konzek, G.J.; Smith, R.I.

    1990-12-01

    This study presents the results of a comparison of a previous decommissioning cost study by Pacific Northwest Laboratory (PNL) and a recent decommissioning cost study of TLG Engineering, Inc., for the same commercial nuclear power reactor station. The purpose of this comparative analysis on the same plant is to determine the reasons why subsequent estimates for similar plants by others were significantly higher in cost and external occupational radiation exposure (ORE) than the PNL study. The primary purpose of the original study by PNL (NUREG/CR-0672) was to provide information on the available technology, the safety considerations, and the probable costs and ORE for the decommissioning of a large boiling water reactor (BWR) power station at the end of its operating life. This information was intended for use as background data and bases in the modification of existing regulations and in the development of new regulations pertaining to decommissioning activities. It was also intended for use by utilities in planning for the decommissioning of their nuclear power stations. The TLG study, initiated in 1987 and completed in 1989, was for the same plant, Washington Public Supply System's Unit 2 (WNP-2), that PNL used as its reference plant in its 1980 decommissioning study. Areas of agreement and disagreement are identified, and reasons for the areas of disagreement are discussed. 31 refs., 3 figs., 22 tabs

  14. Study on the power control system for NPP power unit with the WWER-440 reactor

    International Nuclear Information System (INIS)

    Aleksandrova, N.D.; Naumov, A.V.

    1981-01-01

    Results of model investigations into basic version of the power control systems (PCS) conformably to the WWER-440 NPP power unit are stated. Transient processes in the power unit system when being two PCS versions during perturbations of different parameters: unit power, vapour pressure or position of control rods have been simulated. Investigations into the different PCS versions show that quality of operation of a traditional scheme with a turbine power controller and reactor pressure controller can be significantly improved with the introduction of a high-speed signal of pressure into the reactor controller. The PCS version with the compensation of interrelations between the turbine and reactor controllers constructed according to the same principles as the standard schemes of power units of thermal electric power plant is perspective as well [ru

  15. Cost-benefit analysis for environmental impacts and radwaste system for nuclear power plant

    International Nuclear Information System (INIS)

    Mun, K.N.; Yook, C.C.

    1982-01-01

    During operation of nuclear power plant, radioactive material is inevitably formed. This radioactive material must be safely processed by radwaste system so that essentially zero activity is released to the environment. However zero released activity is not really practicable and population doses resulted from released activity are proportional to total annual cost for the radwaste system. In this study, cost-benefit analysis for the radwaste system of the Korean Nuclear Units 5 and 6 is performed to evaluate the optimization between the total annual cost for the radwaste system and population doses within 80 km from the plants. From the analysis, the following results are obtained; 1. the total population dose is estimated 4.04 x 10 3 man-rem/year, 2. total annual cost for the radwaste system is required $ 1.74 x 10 6 , 3. cost-benefit ratio is estimated $ 429/man-rem. (Author)

  16. Nuclear power and climate change: The cost of adaptation

    International Nuclear Information System (INIS)

    Pailiere, H.

    2012-01-01

    For more than a decade, the international community has been voicing concern over growing greenhouse gas (GHG) emissions, which are believed to be the largest contributor to global warming and more generally to climate change. According to the Intergovernmental Panel on Climate Change (IPCC), an increase in the frequency of heat waves and droughts is expected in many parts of the world, as is that of storms, flooding and cold episodes. The potential consequences of this projected climate change have prompted calls to reduce the use of fossil fuels and to promote low-carbon energy sources such as renewables and nuclear power. At the same time, there has also been growing concern that without a rapid decrease in GHG emissions, climate change could occur at such a scale that it will have a significant impact on major economic sectors including the power generation sector. Although the expanded use of renewables will reduce emissions from the power sector, it will also increase the dependence of distribution systems and electricity production on climatic conditions. Thermal power plants, such as fossil fuel and nuclear, will be affected primarily by the diminishing availability of water and the increasing likelihood of heat waves, which will have an impact on the cooling capabilities and power output of plants. In its 2012 edition of the World Energy Outlook, the IEA underlined the need to address an additional challenge, the water-energy nexus: water needs for energy production are set to grow at twice the rate of energy demands over the next decades. It has thus become clear that the availability of water for cooling will be an important criterion for assessing the viability of energy projects. Given the long operating life of nuclear reactors (60 years for Generation III designs), the possible impact of climate change on the operation and safety of nuclear power plants needs to be addressed at the design and siting stages in order to limit costly adaptation measures

  17. United States cost of military force projection in the Persian Gulf, 1976-2007

    Energy Technology Data Exchange (ETDEWEB)

    Stern, Roger J. [Oil, Energy and the Middle East Program, Department of Near Eastern Studies and Princeton Environmental Institute, Guyot Hall, Princeton University, Princeton, NJ 08544 (United States)

    2010-06-15

    This paper presents the first estimate of United States military cost for Persian Gulf force (C{sub PGfp}) derived entirely by a quantitative method. An activity-based cost (ABC) model uses geographic distribution of aircraft carriers as a proxy allocator of Department of Defense (DoD) baseline cost to regional operations. Allocation follows simply from DoD data that since 1990 no less than one aircraft carrier has been continuously on-station in the Persian Gulf; that eight are required to keep one on-station there; that the Navy has had eleven-fifteen carriers since 1990; and that Army and Air Force units are virtually never deployed to combat operations without Navy units. For 1976-2007 C{sub PGfp} is estimated to be $6.8 x 10{sup 12} and for 2007 $0.5 x 10{sup 12} (2008$). This substantial military investment is not a remedy for the market failure at the heart of regional security problem, which is oil market power. When C{sub PGfp} is added to economic losses attributed to market power in another recent study, the severity of this market failure becomes more apparent. (author)

  18. United States cost of military force projection in the Persian Gulf, 1976-2007

    International Nuclear Information System (INIS)

    Stern, Roger J.

    2010-01-01

    This paper presents the first estimate of United States military cost for Persian Gulf force (C PGfp ) derived entirely by a quantitative method. An activity-based cost (ABC) model uses geographic distribution of aircraft carriers as a proxy allocator of Department of Defense (DoD) baseline cost to regional operations. Allocation follows simply from DoD data that since 1990 no less than one aircraft carrier has been continuously on-station in the Persian Gulf; that eight are required to keep one on-station there; that the Navy has had eleven-fifteen carriers since 1990; and that Army and Air Force units are virtually never deployed to combat operations without Navy units. For 1976-2007 C PGfp is estimated to be $6.8 x 10 12 and for 2007 $0.5 x 10 12 (2008$). This substantial military investment is not a remedy for the market failure at the heart of regional security problem, which is oil market power. When C PGfp is added to economic losses attributed to market power in another recent study, the severity of this market failure becomes more apparent. (author)

  19. Preoperation of Hamaoka Nuclear Power Station Unit No. 4

    International Nuclear Information System (INIS)

    Fukuyo, Tadashi; Kurata, Satoshi

    1994-01-01

    Chubu Electric Power Co. finished preoperation of Hamaoka Nuclear Power Station Unit No. 4 in September, 1993. Although unit 4 has the same reactor design as unit 3, its rated electrical output (1,137MW) is 37MW more than that of unit 3. This increase was achieved mainly by adopting a Moisture Separater Heater in the turbine system. We started preoperation of unit 4 in November 1992 and performed various tests at electrical outputs of 20%, 50%, 75%, and 100%. We finished preoperation without any scram or other major problems and obtained satisfactory results for the functions and performance of the plant. This paper describes the major results of unit 4 preoperation. (author)

  20. Power Dissipation Challenges in Multicore Floating-Point Units

    DEFF Research Database (Denmark)

    Liu, Wei; Nannarelli, Alberto

    2010-01-01

    , we analyze the impact of power dissipation in floating-point (FP) units and we consider different alternatives in the implementation of FP-division that lead to substantial energy savings. We compare the implementation of division in a Fused Multiply-Add (FMA) unit based on the Newton-Raphson...

  1. Evaluating the CO 2 emissions reduction potential and cost of power sector re-dispatch

    Energy Technology Data Exchange (ETDEWEB)

    Steinberg, Daniel C.; Bielen, David A.; Townsend, Aaron

    2018-01-01

    Prior studies of the U.S. electricity sector have recognized the potential to reduce carbon dioxide (CO2) emissions by substituting generation from coal-fired units with generation from under-utilized and lower-emitting natural gas-fired units; in fact, this type of 're-dispatch' was invoked as one of the three building blocks used to set the emissions targets under the Environmental Protection Agency's Clean Power Plan. Despite the existence of surplus natural gas capacity in the U.S., power system operational constraints not often considered in power sector policy analyses, such as transmission congestion, generator ramping constraints, minimum generation constraints, planned and unplanned generator outages, and ancillary service requirements, could limit the potential and increase the cost of coal-to-gas re-dispatch. Using a highly detailed power system unit commitment and dispatch model, we estimate the maximum potential for re-dispatch in the Eastern Interconnection, which accounts for the majority of coal capacity and generation in the U.S. Under our reference assumptions, we find that maximizing coal-to-gas re-dispatch yields emissions reductions of 230 million metric tons (Mt), or 13% of power sector emissions in the Eastern Interconnection, with a corresponding average abatement cost of $15-$44 per metric ton of CO2, depending on the assumed supply elasticity of natural gas.

  2. Semiparametric Power Envelopes for Tests of the Unit Root Hypothesis

    DEFF Research Database (Denmark)

    Jansson, Michael

    This paper derives asymptotic power envelopes for tests of the unit root hypothesis in a zero-mean AR(1) model. The power envelopes are derived using the limits of experiments approach and are semiparametric in the sense that the underlying error distribution is treated as an unknown...

  3. Dedicated auxiliary power units for Hybrid Electric Vehicles

    NARCIS (Netherlands)

    Mourad, S.; Weijer, C.J.T. van de

    1998-01-01

    The use of a dedicated auxiliary power unit is essential to utilize the potential that hybrid vehicles offer for efficient and ultra-clean transportation. An example of a hybrid project at the TNO Road-Vehicles Research Institute shows the development and the results of a dedicated auxiliary power

  4. Methods of projecting operations and maintenance costs for nuclear power plants

    International Nuclear Information System (INIS)

    1995-01-01

    Operations and maintenance cost (OMC) had increased its relative importance to the total generation cost for future nuclear power stations, according to the latest update of the OECD Nuclear Energy Agency (NEA) study on Projected Costs of Generating Electricity (EGC studies). OMC is some 20 to 30% of total generation cost for future nuclear power stations in most NEA member countries. However, nuclear OMC that countries projected in the latest EGC study are spread over a wide range, from 5 to 16 US mills/kWh. In order to understand better the reasons for this wide diversity in nuclear OMC projections, the NEA set up an Expert Group. The focus of this study was on projected OMC that were reported in the past EGC studies, but the Group studied actual OMC experienced from existing units, because knowledge or experience concerning actual OMC certainly influences the choice of assumptions or calculation procedure for estimating OMC for future plants. Cost informations from 14 NEA countries have been analysed on the basis of a standardized framework of detailed components of OMC costs. The rationale for different OMC cost projections reported in previous NEA studies on generation cost is discussed and suggestions are made for future studies on both generation cost and OMC cost. Despite the methodological approach and the reduced extent of differences when excluding exceptional figures, it was not possible fully to clarify the origins and to understand the remaining differences in OMC figures. Several countries which have a long and a good experience of operating nuclear units did not provide sufficient detailed data or did not provide any quantitative data at all. (J.S.). 14 refs., 5 figs., 19 tabs., 4 annexes

  5. Power quality improvement of unbalanced power system with distributed generation units

    DEFF Research Database (Denmark)

    Hu, Y.; Chen, Zhe; Excell, P.

    2011-01-01

    This paper presents a power electronic system for improving the power quality of the unbalanced distributed generation units in three-phase four-wire system. In the system, small renewable power generation units, such as small PV generator, small wind turbines may be configured as single phase...... and control of the converter are described. Simulation results have demonstrated that the system can effectively correct the unbalance and enhance the system power quality....... generation units. The random nature of renewable power sources may result in significant unbalance in the power network and affect the power quality. An electronic converter system is proposed to correct the system unbalance and harmonics so as to deal with the power quality problems. The operation...

  6. Standardization of PWR power plants: Impact of capital investment cost

    International Nuclear Information System (INIS)

    Vincent, C.

    1991-01-01

    The French program is certainly specific to the French context but it is a large and a real experiment of standardized series of units from which we can abstract the main ideas and ranges available in different contexts. It was estimated that the standardized part could reach more than 60% of the capital cost and this percentage does not take into account a regionalized part which also could have been standardized. The main condition is a large program which could be issued from a country or a partnership between different countries. That means, common terms of reference, lists of standardized equipment, same design documents. With a levelized rhythm of erection, beneficial effects of the series could be expected. The scale effect is fairly well known, also we can wonder for instance about the choice between five units of 600 MW and three units of 1000 MW. The answer is depending on the number of units and on the discount rate. (author)

  7. Costs of decommissioning nuclear power plants as reported to the public to date

    International Nuclear Information System (INIS)

    Strasma, J.D.

    1982-01-01

    This paper attempts to determine what information has been available to the public, in the United States, concerning the cost of decommissioning nuclear power plants. The search was conducted in the Television News Index and Abstracts, in the annual indexes to The Reader's Digest, and in two computer-based bibliographic retrieval systems, Lockheed's DIALOG Magazine Index and the New York Times Information Bank. Fewer than ten articles appeared in widely read places, with none at all in the Reader's Digest and none on the evening TV news, from 1974 to date. The cost of decommissioning nuclear power plants was reported in various ways, with a wide range of estimates and relatively little actual experience. Costs were given in dollars of different years, in percentages of construction costs, in cost per KWH as per month to the consumer, etc., making the range of reported costs seem even wider than it really was. It is not surprising that the public fears that decommissioning costs will be alarmingly high. The public debate on energy policy might be more rational with better information on decommissioning costs. 16 references

  8. High Performance Auxiliary Power Unit Technology Demonstrator.

    Science.gov (United States)

    1980-12-01

    aft bearings 1.13 P3 - Power producer CDP 1.14 DPHE - Lube pressure drop at heat exchanger 1.15 POFP - Load airflow orifice pressure 1.16 DPOFP - Load...P𔃽I -PSI G PEBL -PSIG P2 -PS.IG DPHE -PID POFP -F Iu 0. 022±_ 77. 3478 6o5. 6 4±4 ±8L-. 4852 19. 51-17.4 DPOFP -PSID Ni -,. N2-i -RPM NSATM -FPM...28. 0250 83. 3505 29. 861 1:9. 7680 PGi -PSIG PEBL -PSIG P3 -PSIG DPHE -PSID POFP -PSIG 0. 0100 77. 9199 72.4862 17. 25 ±19. 4122 1= DPOFP -PSID NI

  9. The exogenous factors affecting the cost efficiency of power generation

    International Nuclear Information System (INIS)

    Chang, D.-S.; Chen, Y.-T.; Chen, W.-D.

    2009-01-01

    This paper employs a stochastic frontier analysis (SFA) to examine cost efficiency and scale economies in Taiwan Power Company (TPC) by using the panel data covering the period of 1995-2006. In most previous studies, the efficiency estimated by the Panel Data without testing the endogeneity may bring about a biased estimator resulting from the correlation between input and individual effect. A Hausman test is conducted in this paper to examine the endogeneity of input variables and thus an appropriate model is selected based on the test result. This study finds that the power generation executes an increasing return to scale across all the power plants based on the pooled data. We also use installed capacity, service years of the power plant, and type of fuel as explanatory variable for accounting for the estimated cost efficiency of each plant by a logistic regression model to examine the factor affecting the individual efficiency estimates. The results demonstrate that the variable of installed capacity keeps a positive relationship with cost efficiency while the factor of working years has a negative relationship.

  10. Technology and costs for decommissioning the Swedish nuclear power plants

    International Nuclear Information System (INIS)

    1986-05-01

    The study shows that, from the viewpoint of radiological safety, a nuclear power plant can be dismantled immediately after it has been shut down and the fuel has been removed, which is estimated to take about one year. Most of the equipment that will be used in decommissioning is already available and is used routinely in maintenance and rebuilding work at the nuclear power plants. Special equipment need only be developed for dismantlement of the reactor vessel and for demolishing of heavy concrete structures. The dismantling of a nuclear power plant can be accomplished in about five years, with an average labour force of about 200 men. The maximum labour force required for Ringhals 1 has been estimated at about 500 men during the first years, when active systems are being dismantled in a number of fronts in the plant. During the last years when the buildings are being demolished, approximately 50 men are required. In order to limit the labour requirement and the dose burden to the personnel, the material is taken out in as large pieces as possible. The cost of decommissioning a boiling water reactor (BWR) of the size of Ringhals 1 has been estimated to be about MSEK 540 in January 1986 prices, and for a pressurized water reactor (PWR, Ringhals 2) about MSEK 460. The cost for the other Swedish nuclear power plants lie in the range of MSEK 410-760. These are the direct cost for the decommissioning work, to which must be added the costs of transportation and disposal of the decommissioning waste, about 100 000 m/sup3/. These costs have been estimated to be about MSEK 600 for the 12 Swedish reactors. (author)

  11. PACTOLUS, Nuclear Power Plant Cost and Economics by Discounted Cash Flow Method. CLOTHO, Mass Flow Data Calculation for Program PACTOLUS

    International Nuclear Information System (INIS)

    Haffner, D.R.

    1976-01-01

    1 - Description of problem or function: PACTOLUS is a code for computing nuclear power costs using the discounted cash flow method. The cash flows are generated from input unit costs, time schedules and burnup data. CLOTHO calculates and communicates to PACTOLUS mass flow data to match a specified load factor history. 2 - Method of solution: Plant lifetime power costs are calculated using the discounted cash flow method. 3 - Restrictions on the complexity of the problem - Maxima of: 40 annual time periods into which all costs and mass flows are accumulated, 20 isotopic mass flows charged into and discharged from the reactor model

  12. The cost of operating with failed fuel at Virginia power

    International Nuclear Information System (INIS)

    Ford, C.A.

    1988-01-01

    Virginia Power has completed a study of the costs incurred due to fuel failures in its pressurized water reactors. This study was prompted by histories of high primary coolant activity and subsequent fuel inspections at the North Anna and Surry power stations. The study included an evaluation of the total costs of fuel failures as well as an evaluation of the economics of postirradiation fuel inspections. The major costs of fuel failures included personnel radiation exposure, permanently discharged failed fuel, radwaste generation, increased labor requirements, containment entry delays due to airborne radioactivity, and ramp rate restrictions. Although fuel failures affect a utility in several other areas, the items evaluated in the study were thought to be the most significant of the costs. The study indicated that performing a postirradiation failed fuel examination can be economically justified at tramp-corrected 131 I levels of > 0.015 μCi/g. The savings to the utility can be on the order of several million dollars. Additionally, the cost penalty of performing a fuel inspection at lower iodine levels is generally in the range of $200,000. This economic penalty is expected to be outweighed by the intangible benefits of operating with a defect-free core

  13. Validation of a methodology for the study of generation cost of electric power for nuclear power plants

    International Nuclear Information System (INIS)

    Ortega C, R.F.; Martin del Campo M, C.

    2004-01-01

    It was developed a model for the calculation of costs of electric generation of nuclear plants. The developed pattern was validated with the one used by the United States Council for Energy Awareness (USCEA) and the Electric Power Research Institute (EPRI), in studies of comparison of alternatives for electric generation of nuclear plants and fossil plants with base of gas and of coal in the United States described in the guides calls Technical Assessment Guides of EPRI. They are mentioned in qualitative form some changes in the technology of nucleo electric generation that could be included in the annual publication of Costs and Parameters of Reference for the Formulation of Projects of Investment in the Electric Sector of the Federal Commission of Electricity. These changes are in relation to the advances in the technology, in the licensing, in the construction and in the operation of the reactors called advanced as the A BWR built recently in Japan. (Author)

  14. Power conversion unit for the South African direct cycle HTGR

    International Nuclear Information System (INIS)

    Liebenberg, J.J.

    1997-01-01

    The system parameters chosen to optimise the thermal efficiency of the Eskom PBMR whilst maintaining component simplicity is discussed. Power Conversion Unit components, which are now at a preliminary design stage comprise a precooler, two turbo units consisting of a turbine driven compressor, recuperator and a power turbine, driving an alternator. Design aspects of every component is mentioned and the inventory method of poorer control is explained with reference to start-up and and shut-down events, the system an effective load following device, down to 4% of full power. Application of the same design principles for HTGRs smaller than 25 MWe is discussed. (author)

  15. Power supply control units for APS ring magnets

    International Nuclear Information System (INIS)

    Despe, O.D.

    1990-01-01

    The APS storage ring (1104 meters) is divided into 40 sectors. Each sector has 38 magnet coils in five magnet bases. Every alternate sector has an additional quadrupole magnet for skew correction. AR the main dipole magnets, two in each sector are connected in series and fed from one power supply unit. A base is controlled by one power supply control unit (PSCU). Each PSCU is connected to the host computer via a local area network (LAN). This note discusses the hardware configuration of the typical power supply control system used by the APS magnets and the software commands supported by the PSCU

  16. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  17. Medium-term marginal costs in competitive generation power markets

    International Nuclear Information System (INIS)

    Reneses, J.; Centeno, E.; Barquin, J.

    2004-01-01

    The meaning and significance of medium-term marginal costs for a generation company in a competitive power market in analysed. A methodology to compute and decompose medium-term generation marginal costs in a competitive environment is proposed. The methodology is based on a market equilibrium model. The aim is to provide a useful tool for generation companies so that they can manage their resources in an optimal way, helping them with their operation, decision-making processes, asset valuations or contract assessments. (author)

  18. Small-Scale Low Cost Solid Oxide Fuel Cell Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    S. D. Vora

    2008-02-01

    Progress in tasks seeking greater cell power density and lower cost through new cell designs, new cell materials and lower operating temperature is summarized. The design of the program required Proof-of-Concept unit of residential capacity scale is reviewed along with a summary of results from its successful test. Attachment 1 summarizes the status of cell development. Attachment 2 summarizes the status of generator design, and Attachment 3 of BOP design.

  19. The future of nuclear power in the United Kingdom

    International Nuclear Information System (INIS)

    Jones, P.M.S.

    1990-01-01

    The arguments that have been put forward in the United Kingdom to justify the contention by its opponents that nuclear power should not be seen as a safe, economic, strategically desirable and environmentally attractive energy source are examined. Counter arguments are presented to support the belief that these are wholly wrong. In the short to medium term, however, economic and political considerations suggest that the prospects for nuclear power in the United Kingdom are not optimistic. The long term evolution of nuclear power is uncertain but it is possible that the security of energy supply, comparative economics and environmental attractions associated with nuclear power will become more apparent and work in its favour eventually. The conviction is expressed that, by the middle of the next century, the United Kingdom will be reaping the benefits of the fast reactor on a significant scale. (UK)

  20. Constraints on nuclear power development in the United States

    International Nuclear Information System (INIS)

    Brandfon, W.W.

    1984-01-01

    The U.S. nuclear option appears, at this time, to be disappearing. Determinants of energy supply seem to be changing from engineering and economic factors to other considerations. Regulatory and financial constraints now appear to be dominating the guidelines for electrical energy expansion. American electric utilities, for the most part, have not been able to obtain sufficient revenues to cover their costs of production. What price increases that they are being allowed to charge their customers come too late to keep up with inflation. They require increasing quantities of outside funding in the form of debt and equity capital. This they can only obtain at record high rates, if at all. Most utilities are not even earning what their regulators have determined are fair returns. Financial problems and regulatory tangles severely affect nuclear power, despite its proven technology and environmental and economic benefits. If the United States loses the nuclear alternative, the economic consequences of limiting fuels for electric base load generation to coal only will be severe; analogous to a monopoly situation in fuel supply. It is doubtful, despite the huge resources of coal, that the coal industry can satisfy even a reduced future demand. The question then becomes whether the technological leader of the world may in the future be faced with blackouts and rationing of electricity

  1. The transaction costs driving captive power generation: Evidence from India

    International Nuclear Information System (INIS)

    Ghosh, Ranjan; Kathuria, Vinish

    2014-01-01

    The 2003 Indian Electricity Act incentivizes captive power production through open access in an attempt to harness all sources of generation. Yet, we observe that only some firms self-generate while others do not. In this paper we give a transaction cost explanation for such divergent behavior. Using a primary survey of 107 firms from India, we construct a distinct variable to measure the transaction-specificity of electricity use. The ‘make or buy’ decision is then econometrically tested using probit model. Results are highly responsive to transaction-specificity and the likelihood of captive power generation is positively related to it. At the industrial level, this explains why food and chemical firms are more likely to make their own electricity. Since the burden of poor grid supply is highest on smaller sized and high transaction-specific firms, the grid access policies need to account for firm-level characteristics if government wants to incentivize captive power generation. - Highlights: • We analyze why some firms opt for captive power generation while others do not. • We examine the role of transaction costs in this decision making using probit model. • Unique data from a primary survey of manufacturing firms in Andhra Pradesh, India. • Transaction-specificity significantly determines who installs captive power plant (CPP). • Firm-level characteristics crucial in policies incentivizing captive generation

  2. Power shopping - practical advice and cost-saving alternatives

    International Nuclear Information System (INIS)

    Anthofer, J.

    1999-01-01

    Encore Energy Solutions is a power consulting company which operates in California, Alberta and Ontario. The company manages electricity portfolios, sells risk management instruments and works with end users to lower power costs. It also helps utilities manage the evolution to a competitive energy market. In this presentation, a series of overhead viewgraphs were used to explain the roles of different players in Ontario's electric power industry, including generators, retailers, distributors, wholesale sellers, transmitters, wholesale consumers, independent market operators (IMOs), and consultants. The challenges facing municipal electric utilities regarding the wires business and retail services were also discussed. The trends in today's evolving power market were highlighted. These included price elasticity, load dispatch, granularity, long- and short-term volatility, gas prices, day/night spread, transmission tariffs, congestion and cost of capital. A graph depicting volatility term structures for electricity, natural gas and crude oil suggests that instantaneous volatility of power is almost infinite. Issues regarding risk management in terms of shareholder's portfolio values were also discussed. 17 figs

  3. Development and application of automatic frequency and power control systems for large power units

    Energy Technology Data Exchange (ETDEWEB)

    V.A. Bilenko; A.D. Melamed; E.E. Mikushevich; D.Y. Nikol' skii; R.L. Rogachev; N.A. Romanov [ZAO Interavtomatika (Interautomatika AG), Moscow (Russian Federation)

    2008-07-01

    We describe the results of work carried out at ZAO Interavtomatika on the development and putting into use of a system for automatically controlling the frequency and power output of large coal-fired power units involving the retrofitting of the turbine's hydraulic automatic control system. Certificates affirming conformity to the Standard of the System Operator Centralized Dispatching Administration (SO-CDA) have been received for eight power units as an outcome of these efforts.

  4. Cost of wind energy: comparing distant wind resources to local resources in the midwestern United States.

    Science.gov (United States)

    Hoppock, David C; Patiño-Echeverri, Dalia

    2010-11-15

    The best wind sites in the United States are often located far from electricity demand centers and lack transmission access. Local sites that have lower quality wind resources but do not require as much power transmission capacity are an alternative to distant wind resources. In this paper, we explore the trade-offs between developing new wind generation at local sites and installing wind farms at remote sites. We first examine the general relationship between the high capital costs required for local wind development and the relatively lower capital costs required to install a wind farm capable of generating the same electrical output at a remote site,with the results representing the maximum amount an investor should be willing to pay for transmission access. We suggest that this analysis can be used as a first step in comparing potential wind resources to meet a state renewable portfolio standard (RPS). To illustrate, we compare the cost of local wind (∼50 km from the load) to the cost of distant wind requiring new transmission (∼550-750 km from the load) to meet the Illinois RPS. We find that local, lower capacity factor wind sites are the lowest cost option for meeting the Illinois RPS if new long distance transmission is required to access distant, higher capacity factor wind resources. If higher capacity wind sites can be connected to the existing grid at minimal cost, in many cases they will have lower costs.

  5. The hydroelectric power market in the United States

    International Nuclear Information System (INIS)

    2002-01-01

    The second-largest producer of hydroelectric power in the world is the United States, right after Canada. In the United States, 7.1 per cent of net electricity generation was attributed to hydroelectric power in 2000, which totalled 269 terawatt hours (TWh). Aging facilities, outdated technology in some facilities, a cumbersome licensing process, and increasing environmental demands from interest groups for the preservation of river systems and surrounding wildlife challenge the industry. Pacific Coast states, especially California, were faced with electric power shortages during the summer of 2001, due to low market prices, high power usage among consumers and drought. The problems with the deregulation of the electricity market were brought to light by these shortages. Legislation to restructure the electric power industry in 25 states had not been enacted as of January 2002. The purchase of more power from both Canada and the Mexico is being considered by the government of the United States, as is the creation of a national power grid to allow for power transmission throughout the country. The Canada-United States energy trade might be affected by such a move, and result in project construction opportunities for Canadian companies. Renewable energy sources must be responsible for the generation of 10 per cent of power generation levels by 2020, on a gradual basis as mandated by law. By 2005, New York City must purchase 10 per cent of its power from renewable energy sources, reaching 20 per cent by 2010. The repair and replacement of aging dam equipment, the development of advanced turbine technology to protect fish stocks and water quality, dam removal, the construction of power lines are all opportunities open to Canadian companies. 60 refs., 5 tabs

  6. Cost-benefit analyses for the development of magma power

    International Nuclear Information System (INIS)

    Haraden, John

    1992-01-01

    Magma power is the potential generation of electricity from shallow magma bodies in the crust of the Earth. Considerable uncertainty still surrounds the development of magma power, but most of that uncertainty may be eliminated by drilling the first deep magma well. The uncertainty presents no serious impediments to the private drilling of the well. For reasons unrelated to the uncertainty, there may be no private drilling and there may be justification for public drilling. In this paper, we present cost-benefit analyses for private and public drilling of the well. Both analyses indicate there is incentive for drilling. (Author)

  7. Survey on the cost of the photovoltaic power system; Taiyoko hatsuden cost chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Comparisons were made of the power generation cost in Indonesia and Thailand between the photovoltaic power system and other power systems. From the difference in technical standards with Japan, trially calculated were the amount of the potential introduction and the possibly reduced cost. In Indonesia, a plan has started for the introduction of a 50W system to 1 million houses in the unelecrified area, but the introduction has not been so promoted as planned. In Thailand, a plan is being carried out for the introduction of the battery charge station system, but the introduction has remained small-scaled. Comparisons were made among the solar home system in Indonesia, the battery charge station system in Thailand, the diesel engine power generation, and the grid connection with the existing power distribution system. The result concluded that the solar home system is low-priced though it depends on the distance from the existing distribution line and the power consumption amount. Moreover, it was found that the system would be more economical than in the case of Japan if obeying international standards for the photovoltaic power system. 6 refs., 15 figs., 56 tabs.

  8. Probabilistic Analysis of Electrical Energy Costs: Comparing Production Costs for Gas, Coal and Nuclear Power Plants. Annex III

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-12-15

    The increase in electricity demand is linked to the development of the economy and living standards in each country. This is especially true in those developing countries in which electricity consumption is far below the average of industrialized countries. To satisfy the increased demand for electricity, it is necessary to build new electrical power plants that could, in an optimum way, meet the imposed acceptability criteria. The main criteria are the potential to supply the required energy and to supply it with minimum or, at least, acceptable costs and environmental impacts, to satisfy the licensing requirements and be acceptable to the public. The main competitors for electricity production in the next few decades are fossil fuel power plants (coal and gas) and nuclear power plants. Power plants making use of renewables (solar, wind, biomass) are also important, but due to limited energy supply potential and high costs, can only be a supplement to the main generating units. Large hydropower plants would be competitive under the condition that suitable sites for the construction of such plants exist. Unfortunately, both in Croatia and in the rest of central Europe, such sites are scarce.

  9. Government observations on the fourth report from the Committee (Session 1989-90) on the cost of nuclear power

    International Nuclear Information System (INIS)

    1990-01-01

    This report consists of the government's response to the Energy Committee's conclusions about the cost of nuclear power generation in the United Kingdom and the practicalities involved in the possible privatisation of the nuclear power industry. The report was published on 5th December 1990. The report covers the process of privatisation criticisms of Kleinwort Benson, arrangements accounting for and calculating costs of nuclear power and the risks associated with nuclear generating capacity, the Fossil Fuel Levy, some issues particular to Scotland and Sizewell B power station. (author)

  10. Decommissioning cost recovery in the United States: lessons learned from Connecticut Yankee NPP

    International Nuclear Information System (INIS)

    Joosten, J.

    1999-01-01

    The international audience at ICONE-7 is already familiar with the roles of the owner and the NRC in ensuring the technical and safety performance goals of nuclear plant decommissioning. This paper addresses the role of the economic regulator since the pursuit of technical and safety goals must necessarily carry with them -a price tag- and owners must be concerned with the recovery of those costs. Answers to questions about how to pay and who should pay for decommissioning can very often influence nuclear power plant owner's decision-making. In the United States, most nuclear power plants are privately owned. Nevertheless, their owners are not totally free to determine the plant's economics or profitability. Instead, plant owners must sell their electricity to consumers in a regulated market wherein the price of electricity and terms of sale are controlled by the government. Under this regulatory regime, utilities are generally allowed to recover their investment costs -including decommissioning costs- provided that such costs are prudently, incurred. However, when an owner retires the plant prematurely, the prudence of his actions -up to and including the shutdown- are likely to be challenged. In 1997, for example, the owners of the Connecticut Yankee reactor faced a stiff challenge to the recovery of decommissioning costs when they shut down the plant ten years before license expiration. The Connecticut Yankee case thus provides valuable insights into the role of economic regulation on a nuclear plant's decommissioning strategy. (author)

  11. Historical Mass, Power, Schedule, and Cost Growth for NASA Spacecraft

    Science.gov (United States)

    Hayhurst, Marc R.; Bitten, Robert E.; Shinn, Stephen A.; Judnick, Daniel C.; Hallgrimson, Ingrid E.; Youngs, Megan A.

    2016-01-01

    Although spacecraft developers have been moving towards standardized product lines as the aerospace industry has matured, NASA's continual need to push the cutting edge of science to accomplish unique, challenging missions can still lead to spacecraft resource growth over time. This paper assesses historical mass, power, cost, and schedule growth for multiple NASA spacecraft from the last twenty years and compares to industry reserve guidelines to understand where the guidelines may fall short. Growth is assessed from project start to launch, from the time of the preliminary design review (PDR) to launch and from the time of the critical design review (CDR) to launch. Data is also assessed not just at the spacecraft bus level, but also at the subsystem level wherever possible, to help obtain further insight into possible drivers of growth. Potential recommendations to minimize spacecraft mass, power, cost, and schedule growth for future missions are also discussed.

  12. Polymer electrolyte fuel cell mini power unit for portable application

    Energy Technology Data Exchange (ETDEWEB)

    Urbani, F.; Squadrito, G.; Barbera, O.; Giacoppo, G.; Passalacqua, E. [CNR-ITAE, via Salita S. Lucia sopra Contesse n. 5, 98126 S. Lucia, Messina (Italy); Zerbinati, O. [Universita del Piemonte Orientale, Dip. di Scienze dell' Ambiente e della Vita, via Bellini 25/g, 15100 Alessandria (Italy)

    2007-06-20

    This paper describes the design, realisation and test of a power unit based on a polymer electrolyte fuel cell, operating at room temperature, for portable application. The device is composed of an home made air breathing fuel cell stack, a metal hydride tank for H{sub 2} supply, a dc-dc converter for power output control and a fan for stack cooling. The stack is composed by 10 cells with an active surface of 25 cm{sup 2} and produces a rated power of 15 W at 6 V and 2 A. The stack successfully runs with end-off fed hydrogen without appreciable performance degradation during the time. The final assembled system is able to generate 12 W at 9.5 V, and power a portable DVD player for 3 h in continuous. The power unit has collected about 100 h of operation without maintenance. (author)

  13. Decommissioning of nuclear power plants: policies, strategies and costs

    International Nuclear Information System (INIS)

    Lund, I.

    2004-01-01

    As many nuclear power plants will reach the end of their lifetime during the next 20 years or so, decommissioning is an increasingly important topic for governments, regulators and industries. From a governmental viewpoint, particularly in a deregulated market, one essential aspect is to ensure that money for the decommissioning of nuclear installations will be available at the time it is needed, and that no 'stranded' liabilities will be left to be financed by the taxpayers rather than by the electricity consumers. For this reason, there is governmental interest in understanding decommissioning costs, and in periodically reviewing decommissioning cost estimates from nuclear installation owners. Robust cost estimates are key elements in designing and implementing a coherent and comprehensive national decommissioning policy including the legal and regulatory bases for the collection, saving and use of decommissioning funds. From the industry viewpoint, it is essential to assess and monitor decommissioning costs in order to develop a coherent decommissioning strategy that reflects national policy and assures worker and public safety, whilst also being cost effective. For these reasons, nuclear power plant owners are interested in understanding decommissioning costs as best as possible and in identifying major cost drivers, whether they be policy, strategy or 'physical' in nature. National policy considerations will guide the development of national regulations that are relevant for decommissioning activities. Following these policies and regulations, industrial managers responsible for decommissioning activities will develop strategies which best suit their needs, while appropriately meeting all government requirements. Decommissioning costs will be determined by technical and economic conditions, as well as by the strategy adopted. Against this backdrop, the study analyses the relationships among decommissioning policy as developed by governments, decommissioning

  14. Smart Grid Cost-Emission Unit Commitment via Co-Evolutionary Agents

    Directory of Open Access Journals (Sweden)

    Xiaohua Zhang

    2016-10-01

    Full Text Available In this paper, the uncertainty of wind, solar and load; smart charging and discharging of plug-in hybrid electric vehicles (PHEVs to and from various energy sources; and the coordination of wind, solar power, PHEVs and cost-emission are considered in the smart grid unit commitment (UC. First, a multi-scenario simulation is used in which a set of valid scenarios is considered for the uncertainties of wind and solar energy sources and load. Then the UC problem for the set of scenarios is decomposed into the optimization of interactive agents by multi-agent technology. Agents’ action is represented by a genetic algorithm with adaptive crossover and mutation operators. The adaptive co-evolution of agents is reached by adaptive cooperative multipliers. Finally, simulation is implemented on an example of a power system containing thermal units, a wind farm, solar power plants and PHEVs. The results show the effectiveness of the proposed method. Thermal units, wind, solar power and PHEVs are mutually complementarily by the adaptive cooperative mechanism. The adaptive multipliers’ updating strategy can save more computational time and further improve the efficiency.

  15. Technology and costs for decommissioning of Swedish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-06-01

    The decommissioning study for the Swedish nuclear power plants has been carried out during 1992 to 1994 and the work has been led by a steering group consisting of people from the nuclear utilities and SKB. The study has been focused on two reference plants, Oskarshamn 3 and Ringhals 2. Oskarshamn 3 is a boiling water reactor (BWR) and Ringhals 2 is a pressurized water reactor (PWR). Subsequently, the result from these plants have been translated to the other Swedish plants. The study gives an account of the procedures, costs, waste quantities and occupational doses associated with decommissioning of the Swedish nuclear power plants. Dismantling is assumed to start immediately after removal of the spent fuel. No attempts at optimization, in terms of technology or costs, have been made. The nuclear power plant site is restored after decommissioning so that it can be released for use without restriction for other industrial activities. The study shows that a reactor can be dismantled in about five years, with an average labour force of about 150 persons. The maximum labour force required for Oskarshamn 3 has been estimated to about 300 persons. This peak load occurred the first years but is reduced to about 50 persons during the demolishing of the buildings. The cost of decommissioning Oskarshamn 3 has been estimated to be about MSEK 940 in January 1994 prices. The decommissioning of Ringhals 2 has been estimated to be MSEK 640. The costs for the other Swedish nuclear power plants lie in the range MSEK 590-960. 17 refs, 21 figs, 15 tabs.

  16. Technology and costs for decommissioning of Swedish nuclear power plants

    International Nuclear Information System (INIS)

    1994-06-01

    The decommissioning study for the Swedish nuclear power plants has been carried out during 1992 to 1994 and the work has been led by a steering group consisting of people from the nuclear utilities and SKB. The study has been focused on two reference plants, Oskarshamn 3 and Ringhals 2. Oskarshamn 3 is a boiling water reactor (BWR) and Ringhals 2 is a pressurized water reactor (PWR). Subsequently, the result from these plants have been translated to the other Swedish plants. The study gives an account of the procedures, costs, waste quantities and occupational doses associated with decommissioning of the Swedish nuclear power plants. Dismantling is assumed to start immediately after removal of the spent fuel. No attempts at optimization, in terms of technology or costs, have been made. The nuclear power plant site is restored after decommissioning so that it can be released for use without restriction for other industrial activities. The study shows that a reactor can be dismantled in about five years, with an average labour force of about 150 persons. The maximum labour force required for Oskarshamn 3 has been estimated to about 300 persons. This peak load occurred the first years but is reduced to about 50 persons during the demolishing of the buildings. The cost of decommissioning Oskarshamn 3 has been estimated to be about MSEK 940 in January 1994 prices. The decommissioning of Ringhals 2 has been estimated to be MSEK 640. The costs for the other Swedish nuclear power plants lie in the range MSEK 590-960. 17 refs, 21 figs, 15 tabs

  17. Cost reduction potentials of offshore wind power in Germany

    International Nuclear Information System (INIS)

    Hobohm, Jens; Krampe, Leonard; Peter, Frank

    2014-01-01

    Offshore wind power is a major hope for the German energy turnaround. However, it will only be possible to tap its cost reduction potentials if industry, the political leadership and the administrative authorities join forces to create the necessary preconditions. An important requirement for this capital-intensive technology are stable legal and political framework conditions. A recent study on the future shows what needs to be done.

  18. Optimization models of the supply of power structures’ organizational units with centralized procurement

    Directory of Open Access Journals (Sweden)

    Sysoiev Volodymyr

    2013-01-01

    Full Text Available Management of the state power structures’ organizational units for materiel and technical support requires the use of effective tools for supporting decisions, due to the complexity, interdependence, and dynamism of supply in the market economy. The corporate nature of power structures is of particular interest to centralized procurement management, as it provides significant advantages through coordination, eliminating duplication, and economy of scale. This article presents optimization models of the supply of state power structures’ organizational units with centralized procurement, for different levels of simulated materiel and technical support processes. The models allow us to find the most profitable options for state power structures’ organizational supply units in a centre-oriented logistics system in conditions of the changing needs, volume of allocated funds, and logistics costs that accompany the process of supply, by maximizing the provision level of organizational units with necessary material and technical resources for the entire planning period of supply by minimizing the total logistical costs, taking into account the diverse nature and the different priorities of organizational units and material and technical resources.

  19. SunShot solar power reduces costs and uncertainty in future low-carbon electricity systems.

    Science.gov (United States)

    Mileva, Ana; Nelson, James H; Johnston, Josiah; Kammen, Daniel M

    2013-08-20

    The United States Department of Energy's SunShot Initiative has set cost-reduction targets of $1/watt for central-station solar technologies. We use SWITCH, a high-resolution electricity system planning model, to study the implications of achieving these targets for technology deployment and electricity costs in western North America, focusing on scenarios limiting carbon emissions to 80% below 1990 levels by 2050. We find that achieving the SunShot target for solar photovoltaics would allow this technology to provide more than a third of electric power in the region, displacing natural gas in the medium term and reducing the need for nuclear and carbon capture and sequestration (CCS) technologies, which face technological and cost uncertainties, by 2050. We demonstrate that a diverse portfolio of technological options can help integrate high levels of solar generation successfully and cost-effectively. The deployment of GW-scale storage plays a central role in facilitating solar deployment and the availability of flexible loads could increase the solar penetration level further. In the scenarios investigated, achieving the SunShot target can substantially mitigate the cost of implementing a carbon cap, decreasing power costs by up to 14% and saving up to $20 billion ($2010) annually by 2050 relative to scenarios with Reference solar costs.

  20. Impact of Auxiliary Equipments Consumption on Electricity Generation Cost in Selected Power Plants of Pakistan

    Directory of Open Access Journals (Sweden)

    DILEEP KUMAR

    2017-04-01

    Full Text Available This study focuses on higher generation cost of electricity in selected TPPs (Thermal Power Plants in Sindh, Pakistan. It also investigates the energy consumed by the auxiliary equipment of the selected TPPs in Sindh, Pakistan. The AC (Auxiliary Consumption of selected TPPs is compared with that in UK and other developed countries. Results show that the AC in selected TPPs in Sindh, Pakistan exceeds the average AC of the TPPs situated in developed countries. Many energy conservation measures such as impeller trimming and de-staging, boiler feed pump, high voltage inverter, variable frequency drive, and upgrading the existing cooling tower fan blades with fiber reinforced plastic are discussed to overcome higher AC. This study shows that harnessing various available energy conservative measures the AC and unit cost can be reduced by 4.13 and 8.8%; also adverse environmental impacts can be mitigated. Results show that the unit cost of electricity can be reduced from Rs.20 to19/kWh in JTPP (Jamshoro Thermal Power Plant, Rs.9 to 8.8/kWh in GTPS (Gas Turbine Power Station Kotri and Rs. 11 to 10.27/ kWh in LPS (Lakhara Power Station. Thus, electricity production can be improved with the existing capacity, which will eventually assist to manage the current energy crisis and ensure its conservation

  1. Introduction to the methods of estimating nuclear power generating costs

    Energy Technology Data Exchange (ETDEWEB)

    1961-11-01

    The present report prepared by the Agency with the guidance and assistance of a panel of experts from Member States, the names of whom will be found at the end of this report, represents the first step in the methods of cost evaluation. The main objectives of the report are: (1) The preparation of a full list of the cost items likely to be encountered so that the preliminary estimates for a given nuclear power system can be relied upon in deciding on its economic merits. (2) A survey of the methods currently used for the estimation of the generating costs of the power produced by a nuclear station. The survey is intended for a wide audience ranging from engineers to public officials with an interest in the prospects of nuclear power. An attempt has therefore been made to refrain from detailed technical discussions in order to make the presentation easily understandable to readers with only a very general knowledge of the principles of nuclear engineering. 3 figs, tabs.

  2. Introduction to the methods of estimating nuclear power generating costs

    International Nuclear Information System (INIS)

    1961-01-01

    The present report prepared by the Agency with the guidance and assistance of a panel of experts from Member States, the names of whom will be found at the end of this report, represents the first step in the methods of cost evaluation. The main objectives of the report are: (1) The preparation of a full list of the cost items likely to be encountered so that the preliminary estimates for a given nuclear power system can be relied upon in deciding on its economic merits. (2) A survey of the methods currently used for the estimation of the generating costs of the power produced by a nuclear station. The survey is intended for a wide audience ranging from engineers to public officials with an interest in the prospects of nuclear power. An attempt has therefore been made to refrain from detailed technical discussions in order to make the presentation easily understandable to readers with only a very general knowledge of the principles of nuclear engineering. 3 figs, tabs

  3. Cost for the radioactive wastes from nuclear power

    International Nuclear Information System (INIS)

    1992-06-01

    The future cost for handling, storing and disposing of radioactive wastes from the Swedish nuclear power plants are calculated in this report. The following plants and systems are already operating: * Transport system for radioactive wastes, * A control spent fuel intermediate storage plant, * A repository for low and medium level wastes. These are planned: * A treatment plant for used fuels, * A repository for high-level wastes, and * Repository for decommissioning wastes. The costs include R and D and decommissioning. Total future costs from 1993 are estimated to be 46.4 billion SEK (8.3 billion USD), during 60 years. Up to 1992 8.7 billion SEK (1.6 billion USD) have been spent

  4. Accounting and cost control of a nuclear power station

    International Nuclear Information System (INIS)

    Dangelmaier, P.

    1977-01-01

    1) chart or classification of accounts, 2) all plant expenses, 3) cost control, 4) storage of spare parts and supplies, 5) control of applicable dose rate, 6) charges for insurance. The accuracy of accounting and cost control is a primary thing for the efficiency in a nuclear power station. The much more important factor is the availability. It is necessary to save costs by a more effective storage or a more detailed and automatic process of single jobs in the workshop. But a very definite experience made in Obrigheim is the fact that not only commercial people know which financial loss will occur if the plant is out of operation one hour. This knowledge is also important for the technical people and for the workers in the workshops. The technical responsibility and the security in operation of the plant and the commercial understanding for the risk of non-availability do not exclude each other. (HP) [de

  5. Cost for the radioactive wastes from nuclear power

    International Nuclear Information System (INIS)

    1989-06-01

    The future cost for handling, storing and disposing of radioactive wastes from the Swedish nuclear power plants are calculated in this report. The following plants and systems are already operating: - Transportsystem for radioactive wastes. - A control spent fuel intermediate storage plant. - A repository for low and medium level wastes. These are planned: - A treatment plant for used fuels. A repository for high-level wastes and repository for decommissioning wastes. The costs include Rand D and decommissioning. Total future costs from 1990 are estimated to be 43 billion SEK (6,5 billion dollars), during 60 years. Up to 1990 7,4 billion SEK (1,1 billion dollars) have been spent. (L.E.)

  6. Knowledge acquisition for nuclear power plant unit diagnostic system

    International Nuclear Information System (INIS)

    Li Xiaodong; Xi Shuren

    2003-01-01

    The process of acquiring knowledge and building a knowledge base is critical to realize fault diagnostic system at unit level in a nuclear power plant. It directly determines whether the diagnostic system can be applied eventually in a commercial plant. A means to acquire knowledge and its procedures was presented in this paper for fault diagnostic system in a nuclear power plant. The work can be carried out step by step and it is feasible in a commercial nuclear power plant. The knowledge base of the fault diagnostic system for a nuclear power plant can be built after the staff finish the tasks according to the framework presented in this paper

  7. [Unit cost variation in a social security company in Querétaro, México].

    Science.gov (United States)

    Villarreal-Ríos, Enrique; Campos-Esparza, Maribel; Garza-Elizondo, María E; Martínez-González, Lidia; Núñez-Rocha, Georgina M; Romero-Islas, Nestor R

    2006-01-01

    Comparing unit cost variation between departments and reasons for consultation in outpatient health services provided by a social security company from Querétaro, Mexico. A study of costs (in US dollars) was carried out in outpatient health service units during 2004. Fixed unit costs were estimated per department and adjusted for one year's productivity. Material, physical and consumer resources were included. Weighting was assigned to resources invested in each department. Unit cost was estimated by using the micro cost technique; medicaments, materials used during treatment and reagents were considered to be consumer items. Unit cost resulted from adding fixed unit cost to the variable unit cost corresponding to the reason for consulting. Units costs were then compared between the medical units. Unit cost per month for diabetic treatment varied from 34.8 US dollars, 32,2 US dollars to US 34 US dollars, pap smear screening test costs were 7,2 US dollars, 8,7 US dollars and 7,3 US dollars and dental treatment 27 US dollars, 33 US dollars, 6 and 28,7 US dollars. Unit cost variation was more important in the emergency room and the dental service.

  8. Parametric cost analysis of a HYLIFE-II power plant

    International Nuclear Information System (INIS)

    Bieri, R.L.

    1991-01-01

    The SAFIRE (Systems Analysis for ICF Reactor Economics) code was adapted to model a power plant using a HYLIFE-2 reactor chamber. The code was then used to examine the dependence of the plant capital costs and the busbar cost of electricity (COE) on a variety of design parameters (type of driver, chamber repetition rate, and net electric power). The results show the most attractive operating space for each set of driver/target assumptions and quantify the benefits of improvements in key design parameters. The base-case plant was a 1000-MW(e) plant containing a reactor vessel driven by an induction linac heavy-ion accelerator, run at 8 Hz with a driver energy of 6.73 MJ and a target yield of 350 MJ. The total direct cost for this plant was $2.6 billion. (All costs in this paper are given in equivalent 1988 dollars.) The COE was 8.5 cents/(kWh). The COE and total capital costs for a 1000-MW(e) base plant are nearly independent of the chosen combination of repetition rate and driver energy for a driver operating between 4 and 10 Hz. For comparison, the COE for a coal or future fission plant would be 4.5--5.5 cents/(kWh). The COE for a 1000-MW(e) plant could be reduced to 7.5 cents/(kWh) by using advanced targets and could be cut to 6.5 cents/(kWh) with conventional targets, if the driver cost could be cut in half. There is a large economy of scale with heavy-ion-driven inertial confinement fusion (ICF) plants. A 2000-MW(e) plant with a heavy-ion driver and a HYLIFE-2 chamber would have a COE of only 5.8 cents/(kWh)

  9. Costs of electric power generation in different types of power plants

    International Nuclear Information System (INIS)

    Weible, H.

    1977-01-01

    In the framework of our study 'energy - environment - industry' we need among other things the costs of electric power generation. We register their structure in a sub-model. Recently there was disagreement on effective costs of electric power generation particularly when comparing fossil-fuel power plants to nuclear power plants. For this reason, expertises on the costs of electric power generation in nuclear and fossil-fuel power plants were ordered with the Energy-Economic Institute in Cologne as well as with the Battelle Institute in Frankfurt. In the framwork of our paper on the system 'energy - environment - industry' we do not want to give new data potentially required for our task, before the expertises will be finished. Therefore the results given in part III of this lecture are only meant as an example in order to show possible consequences of the cost programs set up, depending on initial data whose general recognition is to be aimed at. Furthermore, the theoretical approach to investment calculation has to win general recognition when recording calculation methods computer-compatibly. Any new formulations discussed in industrial management have not been taken into account. (orig.) [de

  10. Fuel prices, emission standards, and generation costs for coal vs natural gas power plants.

    Science.gov (United States)

    Pratson, Lincoln F; Haerer, Drew; Patiño-Echeverri, Dalia

    2013-05-07

    Low natural gas prices and stricter, federal emission regulations are promoting a shift away from coal power plants and toward natural gas plants as the lowest-cost means of generating electricity in the United States. By estimating the cost of electricity generation (COE) for 304 coal and 358 natural gas plants, we show that the economic viability of 9% of current coal capacity is challenged by low natural gas prices, while another 56% would be challenged by the stricter emission regulations. Under the current regulations, coal plants would again become the dominant least-cost generation option should the ratio of average natural gas to coal prices (NG2CP) rise to 1.8 (it was 1.42 in February 2012). If the more stringent emission standards are enforced, however, natural gas plants would remain cost competitive with a majority of coal plants for NG2CPs up to 4.3.

  11. Resilient guaranteed cost control of a power system.

    Science.gov (United States)

    Soliman, Hisham M; Soliman, Mostafa H; Hassan, Mohammad F

    2014-05-01

    With the development of power system interconnection, the low-frequency oscillation is becoming more and more prominent which may cause system separation and loss of energy to consumers. This paper presents an innovative robust control for power systems in which the operating conditions are changing continuously due to load changes. However, practical implementation of robust control can be fragile due to controller inaccuracies (tolerance of resistors used with operational amplifiers). A new design of resilient (non-fragile) robust control is given that takes into consideration both model and controller uncertainties by an iterative solution of a set of linear matrix inequalities (LMI). Both uncertainties are cast into a norm-bounded structure. A sufficient condition is derived to achieve the desired settling time for damping power system oscillations in face of plant and controller uncertainties. Furthermore, an improved controller design, resilient guaranteed cost controller, is derived to achieve oscillations damping in a guaranteed cost manner. The effectiveness of the algorithm is shown for a single machine infinite bus system, and then, it is extended to multi-area power system.

  12. The effects of regional insolation differences upon advanced solar thermal electric power plant performance and energy costs

    Science.gov (United States)

    Latta, A. F.; Bowyer, J. M.; Fujita, T.

    1979-01-01

    This paper presents the performance and cost of four 10-MWe advanced solar thermal electric power plants sited in various regions of the continental United States. Each region has different insolation characteristics which result in varying collector field areas, plant performance, capital costs, and energy costs. The paraboloidal dish, central receiver, cylindrical parabolic trough, and compound parabolic concentrator (CPC) comprise the advanced concepts studied. This paper contains a discussion of the regional insolation data base, a description of the solar systems' performances and costs, and a presentation of a range for the forecast cost of conventional electricity by region and nationally over the next several decades.

  13. Development of a Cost Effective Power Generation System: An Overview

    Directory of Open Access Journals (Sweden)

    Shiv Prakash Bihari

    2016-03-01

    Full Text Available This paper presents an overview on development of cost effective power generation system and motivates for development of a model for hybrid system with wind to investigate the combined operation of wind with different sources to cater to wind’s stochastic nature for imbalance minimization and optimal operation. Development of model for trading power in competitive electricity market and development of strategies for trading in electricity markets (wind energy and reserves markets to investigate the effects of real time pricing tariffs on electricity market operation has been illustrated in this paper. Dynamic modelling related studies to investigate the wind generator’s kinetic energy for primary frequency support using simulink and simulation studies on doubly fed induction generator to study its capability during small disturbances / fluctuations on power system have been described.

  14. ORSIM, Nuclear Fuel, Fossil Fuel Hydroelectric Power Plant Cost and Economics

    International Nuclear Information System (INIS)

    Prince, B.E.; Turnage, J.C.

    1984-01-01

    1 - Description of problem or function: ORSIM is an electric power generating system integration model which simulates the multi-year operation of a mixed power system consisting of fossil, nuclear, hydroelectric, and pumped-storage units. For any specified refueling schedule for nuclear units and future load forecast, the model determines a plan of operation for the system which attempts to minimize the total discounted operating cost over a specified study period. The analysis considers the effects of forced outages, spinning reserve operating constraints, and scheduled introduction and retirement of generating stations. The model determines a maintenance schedule for the non-nuclear stations (nuclear stations are maintained during refueling outages) and the optimum allocation of energy-fixed nuclear and hydroelectric resources. It calculates the expected energy generated by each station in the system, by period over the planning horizon, based on input or calculated incremental operating cost. It also calculates the expected loss-of- load probability and un-served energy demand for each period in the planning horizon. An optimum operating plan, designed to minimize the discounted total production cost, is then calculated, as are the costs of operating each station in the system and the discounted total production cost for the derived plan of operation. 2 - Method of solution: ORSIM searches for a particular mode of operation which, over a multi-year planning horizon, will minimize the total system operating cost of a particular electric power generation system discounted to the beginning of the planning horizon. It does this by: (a) calculating the planned maintenance outages for all units; (b) estimating the incremental discounted cost of energy produced by each station in the system for every subinterval of the planning horizon; (c) utilizing the incremental discounted costs of energy generation to calculate, via probabilistic simulation, the economic optimum

  15. Improving Size and Power in Unit Root Testing

    DEFF Research Database (Denmark)

    Haldrup, Niels; Jansson, Michael

    A frequent criticism of unit root tests concerns the poor power and size properties that many of such testsexhibit. However, the past decade or so intensive research has been conducted to alleviate these problems and great advances have been made. The present paper provides a selective survey...... of recent contributions to improve upon both size and power of unit root tests and in so doing the approach of using rigorous statistical optimality criteria in the development of such tests is stressed. In addition to presenting tests where improved size can be achieved by modifying the standard Dickey......-Fuller class of tests, the paper presents theory of optimal testing and the construction of power envelopes for unit root tests underdifferent conditions allowing for serial correlation, deterministic components, assumptions regarding the initial condition, non-Gaussian errors, and the use of covariates....

  16. Application of the discounted value flows method in production cost calculations for Czechoslovak nuclear power plants

    International Nuclear Information System (INIS)

    Majer, P.

    1990-01-01

    The fundamentals are outlined of the discounted value flows method, which is used in industrial countries for calculating the specific electricity production costs. Actual calculations were performed for the first two units of the Temelin nuclear power plant. All costs associated with the construction, operation and decommissioning of this nuclear power plant were taken into account. With a high degree of certainty, the specific production costs of the Temelin nuclear power plant will lie within the range of 0.32 to 0.36 CSK/kWh. Nearly all results of the sensitivity analysis performed for the possible changes in the input values fall within this range. An increase in the interest rate to above 8% is an exception; this, however, can be regarded as rather improbable on a long-term basis. Sensitivity analysis gave evidence that the results of the electricity production cost calculations for the Temelin nuclear power plant can be considered sufficiently stable. (Z.M.). 7 figs., 2 tabs., 14 refs

  17. The Future of Solar Power in the United Kingdom

    Directory of Open Access Journals (Sweden)

    Gerard Reid

    2015-07-01

    Full Text Available We used detailed industry data to analyse the impacts of expected further cost reductions on the competitiveness of solar power in Britain, and assess whether the solar market can survive without support in the near future. We investigated three solar power markets: large-scale, ground-mounted “solar farms” (defined in our analysis as larger than a 5000 kilowatt system; commercial roof-top (250 kW; and residential rooftop (3 kW. We found that all three would be economic without support in the next decade. Such an outcome assumes progressively falling support under a stable policy regime. We found that unsubsidised residential solar power may be cheaper with battery storage within the next five to 10 years. Unsupported domestic solar battery packs achieve payback periods of less than 10 years by 2025. That could create an inflexion point driving adoption of domestic solar systems. The variability of solar power will involve some grid integration costs at higher penetration levels, such as more frequent power market scheduling; more interconnector capacity; storage; and backup power. These costs and responses could be weighed against non-market benefits including the potential for grid balancing; lower carbon and particulate emissions; and energy security.

  18. Estimation of the Levelised Electricity Generation Cost for a PWR-Power Plant and Preliminary Evaluation of National Participation

    International Nuclear Information System (INIS)

    Saba, G; Hainoun, A

    2008-01-01

    This work deals with the detailed economic evaluation of the Levelised discounted electricity generation costs (LDEGC) for a nuclear power plant with pressurized water reactor (PWR). The total generation costs are splited in base construction costs, supplementary costs, owner's costs, financial costs, fuel cycle costs and operation and maintenance costs. The evaluation covers also the sensitivity of the estimated energy unit cost to various factors (real annual discount rate, escalation rate, interest rate, load factor, ..) including the role of national participation, that depends upon the development of national infrastructure. For performing this study the IAEA's program package for economic bid evaluation (Bideval-3) has been employed. The program is designed to assist the user in the economic evaluation of bids for nuclear power plant (NPP). It follows the recommended method of determining the present worth value of all costs components for generated electricity unit. The performed study aims at developing national expertise in the field of bid evaluation for electric power plants with main emphasis on NPP. Additional goal is to convoying the technical and economic development of NPP technology that can help in supporting the decision maker with adequate information related to the future development of energy supply system and measures required for ensuring national energy supply security. (author)

  19. Evaluation of the electric power production cost growth due to decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Basso, G.

    1982-01-01

    The increase of production cost for electric power generated by nuclear plants, due to their decommissioning and the end of operating life, is analysed in respect to (a) waiting time from indefinite shut-down date to the start of dismantlement, (b) financing method, (c) interest and inflation rates. The analysis shows that the additional cost is always small for those solutions which have higher probability to be adopted

  20. South Korean energy scenarios show how nuclear power can reduce future energy and environmental costs

    International Nuclear Information System (INIS)

    Hong, Sanghyun; Bradshaw, Corey J.A.; Brook, Barry W.

    2014-01-01

    South Korea is an important case study for understanding the future role of nuclear power in countries with on-going economic growth, and limited renewable energy resources. We compared quantitatively the sustainability of two ‘future-mapping’ exercises (the ‘Governmental’ scenario, which relies on fossil fuels, and the Greenpeace scenario, which emphasises renewable energy and excludes nuclear power). The comparison was based on a range of environmental and technological perspectives, and contrasted against two additional nuclear scenarios that instead envisage a dominant role for nuclear energy. Sustainability metrics included energy costs, external costs (greenhouse-gas emissions, air pollutants, land transformation, water consumption and discharge, and safety) and additional costs. The nuclear-centred scenarios yielded the lowest total cost per unit of final energy consumption by 2050 ($14.37 GJ −1 ), whereas the Greenpeace scenario has the highest ($25.36 GJ −1 ). We used probabilistic simulations based on multi-factor distributional sampling of impact and cost metrics to estimate the overlapping likelihoods among scenarios to understand the effect of parameter uncertainty on the integrated recommendations. Our simulation modelling implies that, despite inherent uncertainties, pursuing a large-scale expansion of nuclear-power capacity offers the most sustainable pathway for South Korea, and that adopting a nuclear-free pathway will be more costly and produce more greenhouse-gas emissions. - Highlights: • Nuclear power has a key role to play in mitigating greenhouse-gas emissions. • The Greenpeace scenario has higher total external cost than the nuclear scenarios. • The nuclear-centred scenarios offer the most sustainable option for South Korea. • The similar conclusions are likely to apply to other Asian countries

  1. Coverage Range and Cost Comparison of Remote Antenna Unit Designs for Inbuilding Radio over Fiber Technology

    Directory of Open Access Journals (Sweden)

    Razali Ngah

    2013-09-01

    Full Text Available Future communication needs to be ubiquitous, broadband, convergent, and seamless. Radio over fiber (RoF technology is one of the most important enabler in access network for the technologies. Adoption of RoF faces bottleneck in optoelectronics, that they are still expensive, high power consumption, and limited in bandwidth. To solve the problem, transceiver in remote antenna unit (RAU is developed, i.e. electroabsorption transceiver (EAT and asymmetric FabryPerot modulator (AFPM. This paper compares their coverage range and cost in providing WCDMA and WLAN services. Needed gain of RF amplifier for supporting picocell is also discussed.

  2. Power unit-cargo space link in transport

    Directory of Open Access Journals (Sweden)

    Radmilović Zoran R.

    2005-01-01

    Full Text Available This paper deals with transportation technology regarding links between power unit and cargo space. These links can be divided into two groups: rigid and flexible. Rigid link, established between power unit and cargo space, is dominant in maritime and road transport (sea ships and trucks, and occasionally in transport on inland waterways (self- propelled barges. Flexible link is used in the railroad transport (systems with trailers and semi trailers, and in inland waterway transport (push - towing and pulling systems, and combinations of the systems. The main goal of this research is determination of possible link types and organization of the means of transportation.

  3. Inspection of licensed nuclear power plants in the United States

    International Nuclear Information System (INIS)

    Thornburg, H. D.

    1977-01-01

    Inspection of licensed nuclear power plants in the United States is performed by the Office of Inspection and Enforcement (IE), United States Nuclear Regulatory Commission. IE has several key functions : a) Inspection of licensees and investigation of incidents, occurrences and allegations. b) Detection and correction of safety and security problems. c) Enforcement of rules, regulations, and Commission orders. d) Feedback to the industry and others regarding safety experience. e) Informing the public and others. Major enforcement actions and events involving operating power reactors for the past several years will be summarized. (author)

  4. Comparison study on models for calculation of NPP’s levelized unit electricity cost

    International Nuclear Information System (INIS)

    Nuryanti; Mochamad Nasrullah; Suparman

    2014-01-01

    Economic analysis that is generally done through the calculation of Levelized Unit Electricity Cost (LUEC) is crucial to be done prior to any investment decision on the nuclear power plant (NPP) project. There are several models that can be used to calculate LUEC, which are: R&D PT. PLN (Persero) Model, Mini G4ECONS model and Levelized Cost model. This study aimed to perform a comparison between the three models. Comparison technique was done by tracking the similarity used for each model and then given a case of LUEC calculation for SMR NPP 2 x 100 MW using these models. The result showed that the R&D PT. PLN (Persero) Model have a common principle with Mini G4ECONS model, which use Capital Recovery Factor (CRF) to discount the investment cost which eventually become annuity value along the life of plant. LUEC on both models is calculated by dividing the sum of the annual investment cost and the cost for operating NPP with an annual electricity production.While Levelized Cost model based on the annual cash flow. Total of annual costs and annual electricity production were discounted to the first year of construction in order to obtain the total discounted annual cost and the total discounted energy generation. LUEC was obtained by dividing both of the discounted values. LUEC calculations on the three models produce LUEC value, which are: 14.5942 cents US$/kWh for R&D PT. PLN (Persero) Model, 15.056 cents US$/kWh for Mini G4ECONs model and 14.240 cents US$/kWh for Levelized Cost model. (author)

  5. U.S. Nuclear Power Plant Operating Cost and Experience Summaries

    International Nuclear Information System (INIS)

    Reid, RL

    2003-01-01

    The ''U.S. Nuclear Power Plant Operating Cost and Experience Summaries'' (NUREG/CR-6577, Supp. 2) report has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants during 2000-2001. Costs incurred after initial construction are characterized as annual production costs, which represent fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications, which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operations summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from operating reports submitted by the licensees, the Nuclear Regulatory Commission (NRC) database for enforcement actions, and outage reports

  6. HYLIFE-II power conversion system design and cost study

    International Nuclear Information System (INIS)

    Hoffman, M.A.

    1990-09-01

    The power conversion system for the HYLIFE-2 fusion power plant has been defined to include the IHX's (intermediate heat exchangers) and everything that support the exchange of energy from the reactor. It is referred to simply as the BOP (balance of plant) in the rest of this report. The above is a convenient division between the reactor equipment and the rest of the fusion power plant since the BOP design and cost then depend only on the specification of the thermal power to the IHX's and the temperature of the primary Flibe coolant into and out of the IHX's, and is almost independent of the details of the reactor design. The main efforts during the first year have been on the definition and thermal-hydraulics of the IHX's, the steam generators and the steam power plant, leading to the definition of a reference BOP with the molten salt, Flibe, as the primary coolant. A summary of the key results in each of these areas is given in this report

  7. [Analysis of cost and efficiency of a medical nursing unit using time-driven activity-based costing].

    Science.gov (United States)

    Lim, Ji Young; Kim, Mi Ja; Park, Chang Gi

    2011-08-01

    Time-driven activity-based costing was applied to analyze the nursing activity cost and efficiency of a medical unit. Data were collected at a medical unit of a general hospital. Nursing activities were measured using a nursing activities inventory and classified as 6 domains using Easley-Storfjell Instrument. Descriptive statistics were used to identify general characteristics of the unit, nursing activities and activity time, and stochastic frontier model was adopted to estimate true activity time. The average efficiency of the medical unit using theoretical resource capacity was 77%, however the efficiency using practical resource capacity was 96%. According to these results, the portion of non-added value time was estimated 23% and 4% each. The sums of total nursing activity costs were estimated 109,860,977 won in traditional activity-based costing and 84,427,126 won in time-driven activity-based costing. The difference in the two cost calculating methods was 25,433,851 won. These results indicate that the time-driven activity-based costing provides useful and more realistic information about the efficiency of unit operation compared to traditional activity-based costing. So time-driven activity-based costing is recommended as a performance evaluation framework for nursing departments based on cost management.

  8. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC

    Directory of Open Access Journals (Sweden)

    Mohammad Javad Abdollahi

    2015-08-01

    Full Text Available In this paper security constraints unit commitment (SCUC in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested for many researchers and network operators. Using Electrical Vehicles (PEVs and wind power for energy production is one of the newest proposed methods for replacing fossil fuels.One of the effective strategies for analyzing of the effects of Vehicle 2 Grid (V2G and wind power in optimal operation of generation is running of SCUC for power systems that are equipped with V2G and wind power resources. In this paper, game theory method is employed for deterministic solution of day-ahead unit commitment with considering security constraints in the simultaneous presence of V2G and wind power units. This problem for two scenarios of grid-controlled mode and consumer-controlled mode in three different days with light, medium and heavy load profiles is analyzed. Simulation results show the effectiveness of the presence of V2G and wind power for decreasing of generation cost and improving operation indices of power systems.

  9. Power Processing Unit For Micro Satellite Electric Propulsion System

    Directory of Open Access Journals (Sweden)

    Savvas Spiridon

    2017-01-01

    Full Text Available The Micro Satellite Electric Propulsion System (MEPS program has been originated by the increasing need to provide a low-cost and low-power Electric Propulsion System (EPS for small satellites ( 92%, small size and weight and high reliability. Its functional modules and preliminary results obtained at breadboard level are also presented.

  10. Nuclear fuel cycle cost estimation and sensitivity analysis of unit costs on the basis of an equilibrium model

    International Nuclear Information System (INIS)

    Kim, S. K.; Ko, W. I.; You, S. R.; Gao, R. X.

    2015-01-01

    This paper examines the difference in the value of the nuclear fuel cycle cost calculated by the deterministic and probabilistic methods on the basis of an equilibrium model. Calculating using the deterministic method, the direct disposal cost and Pyro-SFR (sodium-cooled fast reactor) nuclear fuel cycle cost, including the reactor cost, were found to be 66.41 mills/kWh and 77.82 mills/kWh, respectively (1 mill = one thousand of a dollar, i.e., 10-3 $). This is because the cost of SFR is considerably expensive. Calculating again using the probabilistic method, however, the direct disposal cost and Pyro-SFR nuclear fuel cycle cost, excluding the reactor cost, were found be 7.47 mills/kWh and 6.40 mills/kWh, respectively, on the basis of the most likely value. This is because the nuclear fuel cycle cost is significantly affected by the standard deviation and the mean of the unit cost that includes uncertainty. Thus, it is judged that not only the deterministic method, but also the probabilistic method, would also be necessary to evaluate the nuclear fuel cycle cost. By analyzing the sensitivity of the unit cost in each phase of the nuclear fuel cycle, it was found that the uranium unit price is the most influential factor in determining nuclear fuel cycle costs.

  11. Costs related to radioactive residues from nuclear power

    International Nuclear Information System (INIS)

    1988-06-01

    The nuclear power enterprises are responsible for proper actions for safe handling and final storage of spent nuclear fuel and radioactive waste from Swedish nuclear power facilities. The most important actions are to plan, build and operate necessary plants and systems. The nuclear power enterprises have designated Swedish Nuclear Fuel and Waste Management Co., (SKB), to perform these tasks. In this report calculations concerning costs to carry out these tasks are presented. The calculations are based upon a plan prepared by SKB. The plan is described in the report. As final storage of the long lived and highly radioactive waste is planned to take place in the 21st century continuing research and development may indicate new methods which may affect system design as well as costs in a simplifying way. Plants and systems already operational are: Transport systems for radioactive waste products; A central temporary storage for spent nuclear fuel, 'CLAB'; A final storage for radioactive waste from operating nuclear facilities, 'SFR 1'. (L.F.)

  12. Evaluation of power commissioning of the Mochovce Unit 1 power level up to 100 % Nnom

    International Nuclear Information System (INIS)

    Sarvaic, I.; Mickolci, M.

    1998-01-01

    The document contains an evaluation of the power phase of power commissioning of the Mochovce Unit 1 in the phase up to the power level of 100 % N nom .In the document, the courses and results of tests in this phase of power commissioning are summarized, evaluation of the performance of important systems and equipment of the unit is carried out, and the compliance with Limits and Conditions in the course of the phase is assessed. On this basis, conclusions are drawn and recommendations for the unit to be ready for subsequent phases of the power commissioning. The evaluation was developed by the scientific management of the Mochovce commissioning providing an independent support for the operators for supervising the commissioning tasks from the point of nuclear safety

  13. Phasor Measurement Units in the Eastern Danish power system

    DEFF Research Database (Denmark)

    Nielsen, Arne Hejde; Pedersen, Knud Ole Helgesen; Jørgensen, Preben

    2006-01-01

    Technology. After power system events data can be extracted and analyzed offline. The purpose of the project is to do research within various utilizations of PMU data. On 8 January 2005 a severe storm passed Denmark, and wind speeds were so high, that wind turbines disconnected from the transmission grid...... because of their self protection. Nysted offshore wind farm was among the wind power units that disconnected from the grid, and PMU data from that event are analyzed. The case illustrates the close relation between voltages, power flows and voltage phase angles over a wide area. The voltage phase angle...

  14. The effects of electric power industry restructuring on the safety of nuclear power plants in the United States

    Science.gov (United States)

    Butler, Thomas S.

    Throughout the United States the electric utility industry is restructuring in response to federal legislation mandating deregulation. The electric utility industry has embarked upon an extraordinary experiment by restructuring in response to deregulation that has been advocated on the premise of improving economic efficiency by encouraging competition in as many sectors of the industry as possible. However, unlike the telephone, trucking, and airline industries, the potential effects of electric deregulation reach far beyond simple energy economics. This dissertation presents the potential safety risks involved with the deregulation of the electric power industry in the United States and abroad. The pressures of a competitive environment on utilities with nuclear power plants in their portfolio to lower operation and maintenance costs could squeeze them to resort to some risky cost-cutting measures. These include deferring maintenance, reducing training, downsizing staff, excessive reductions in refueling down time, and increasing the use of on-line maintenance. The results of this study indicate statistically significant differences at the .01 level between the safety of pressurized water reactor nuclear power plants and boiling water reactor nuclear power plants. Boiling water reactors exhibited significantly more problems than did pressurized water reactors.

  15. Dynamic evaluation of the levelized cost of wind power generation

    International Nuclear Information System (INIS)

    Díaz, Guzmán; Gómez-Aleixandre, Javier; Coto, José

    2015-01-01

    Highlights: • Conventional levelized cost of energy is static and does not consider flexibility. • This paper defines a dynamic version by means of stochastic programming. • A penalty for early exercising is proposed to differentiate static and dynamic. • Results show the effects of feed-in tariff support in low wind sites. • Policy implications are derived on the basis of the static and dynamic measures. - Abstract: This paper discusses an alternative computation method of the levelized cost of energy of distributed wind power generators. Unlike in the conventional procedures, it includes time of commencement as an optimization variable. For that purpose, a methodology from Longstaff and Schwartz’s dynamic program for pricing financial American options is derived, which provides the ability to find the optimum time and value while coping with uncertainty revenues from energy sales and variable capital costs. The results obtained from the analysis of wind records of 50 sites entail that the conventional levelized cost of energy can be broken down into an optimum, minimum (time-dependent) value and a penalty for early exercising, which can be employed to define investment strategies and support policies

  16. Low power data acquisition unit for autonomous geophysical instrumentation

    Science.gov (United States)

    Prystai, Andrii

    2017-04-01

    The development of an autonomous instrumentation for field research is always a challenge which needs knowledge and application of recent advances in technology and components production. Using this information a super-low power, low-cost, stand-alone GPS time synchronized data acquisition unit was created. It comprises an extended utilization of the microcontroller modules and peripherals and special firmware with flexible PLL parameters. The present report is devoted to a discussion of synchronization mode of data sampling in autonomous field instruments with possibility of GPS random breaks. In the result the achieved sampling timing accuracy is better than ± 60 ns without phase jumps and distortion plus fixed shift depending on the sample rate. The main application of the system is for simultaneous measurement of several channels from magnetic and electric sensors in field conditions for magneto-telluric instruments. First utilization of this system was in the new developed versions of LEMI-026 magnetometer and LEMI-423 field station, where it was applied for digitizing of up to 6 analogue channels with 32-bit resolution in the range ± 2.5V, digital filtration (LPF) and maximum sample rate 4kS/s. It is ready for record in 5 minutes after being turned on. Recently, this system was successfully utilized with the drone-portable magnetometers destined for the search of metallic objects, like UXO, in rural areas, research of engineering underground structure and for mapping ore bodies. The successful tests of drone-portable system were made and tests results are also discussed.

  17. Biodiesel fuel costs and environmental issues when powering railway locomotives

    Energy Technology Data Exchange (ETDEWEB)

    Mirza, Abdul; Ziemer, Norbert; Tatara, Robert; Moraga, Reinaldo; Mirman, Clifford; Vohra, Promod

    2010-09-15

    Issues for adopting biodiesel fuel, instead of petrodiesel, to power railroad locomotives are engine performance and emissions, fuel infrastructure, and fuel cost. These are evaluated for B2 through B100 blends. Biodiesel's solvent action on fuel systems is addressed. With biodiesel, hydrocarbon, carbon monoxide, and particulate emissions are unchanged or reduced. Nitrogen oxides are elevated but it is believed that engine alterations can minimize these emissions. A Transportation Model, using data from a major railway, has demonstrated that refueling depots can be fully supplied with biodiesel at a pricing premium of 1% to 26%, depending on blend and geographical location.

  18. Cost-benefit analysis for combined heat and power plant

    International Nuclear Information System (INIS)

    Sazdovski, Ace; Fushtikj, Vangel

    2004-01-01

    The paper presents a methodology and practical application of Cost-Benefit Analysis for Combined Heat and Power Plant (Cogeneration facility). Methodology include up-to-date and real data for cogeneration plant in accordance with the trends ill development of the CHP technology. As a case study a CHP plant that could be built-up in Republic of Macedonia is analyzed. The main economic parameters for project evaluation, such as NPV and IRR are calculated for a number of possible scenarios. The analyze present the economic outputs that could be used as a decision for CHP project acceptance for investment. (Author)

  19. Cost related to nuclear power plants: the international experience

    International Nuclear Information System (INIS)

    1995-03-01

    This report about the international costs of nuclear electricity generations is divided in two distinct parts: the first one shows the competitiveness of the main sources of electricity generation for base load operation according to studies carried on by OECD and UNIPEDE since 1983; the second one discusses the most recent OECD study about the different types of power plants to be constructed in its number states, based on the experience of each country and the technology evolution of the different fuels used. (F.E.). 4 refs, 2 figs, 27 tab

  20. Comparing costs of power and heat production by prospective and present sources

    International Nuclear Information System (INIS)

    Novak, S.

    1979-01-01

    Capital and running costs are compared of power and heat production from different sources. The lowest capital costs were found for coal-fired power plants followed by light water reactor power plants. The capital costs of other types of power plants, such as wind, geothermal, solar, thermonuclear power plants are significantly higher. The estimated specific cost for electric power production in 1985 for a nuclear power plant is lower than for a fossil-fuel power plant. It is estimated that in 1985 coal will be the cheapest heat source. (Ha)

  1. Site selection and evaluation of nuclear power units in Egypt

    International Nuclear Information System (INIS)

    Bonnefille, R.

    1980-01-01

    The selection of sites for nuclear power units in Egypt by SOFRATOME for Nuclear Plants Authority is carried on using a method based on interaction between different criteria. The method and the main results on criterion 'radio-ecological impact' are sketched briefly [fr

  2. Estimation of small-scale hydroelectric power plant costs; Estimacao de custos de PCH

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira [MS Consultoria Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Silva, Benedito Claudio da [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Magalhaes, Ricardo Nogueira [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil)

    2010-07-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  3. Understanding coal quality and its relationship to power plant performance and costs

    Energy Technology Data Exchange (ETDEWEB)

    Jennison, K.D.; Stallard, G.S. [Black & Veatch International, Overland Park, KS (United States)

    1995-12-01

    The availability of reliable, reasonably priced energy is a necessary cornerstone for established and emerging economies. In addition to addressing coal quality issues strictly at a plant level, it is now prudent to consider long-term performance and economics of particular fuel sources to be selected in the light of system economics and reliability. In order to evaluate coal quality issues in a more comprehensive manner, it is important to develop both an approach and a set of tools which can support the various phases of the planning/analysis processes. The processes must consider the following: (1) Cost/availability of other potential coal supplies, including {open_quotes}raw{close_quotes} domestic sources, {open_quotes}cleaned {close_quotes} domestic sources, and other internationally marketed coals. (2) Power plant performance issues as function of plant design and fuel properties. (3) System expansion plans, candidate technologies, and associated capital and operating costs. (4) Projected load demand, for system and for individual units within the system. (5) Legislative issues such as environmental pressures, power purchase agreements, etc. which could alter the solution. (6) Economics of potential plans/strategies based on overall cost-effectiveness of the utility system, not just individual units. (7) Anticipated unit configuration, including addition of environmental control equipment or other repowering options. The Coal Quality Impact Model (CQIM{trademark}) is a PC-based computer program capable of predicting coal-related cost and performance impacts at electric power generating sites. The CQIM was developed for EPRI by Black & Veatch and represents over a decade of effort geared toward developing an extensible state-of-the-art coal quality assessment tool. This paper will introduce CQIM, its capabilities, and its application to Eastern European coal quality assessment needs.

  4. Effects of a shortened depreciation schedule on the investment costs for combined heat and power; TOPICAL

    International Nuclear Information System (INIS)

    Kranz, Nicole; Worrell, Ernst

    2001-01-01

    We investigate and compare several generic depreciation methods to assess the effectiveness of possible policy measures with respect to the depreciation schedules for investments in combined heat and power plants in the United States. We assess the different depreciation methods for CHP projects of various sizes (ranging from 1 MW to 100 MW). We evaluate the impact of different depreciation schedules on the tax shield, and the resulting tax savings to potential investors. We show that a shorter depreciation cycle could have a substantial impact on the cost of producing power, making cogeneration more attractive. The savings amount to approximately 6-7 percent of capital and fixed operation and maintenance costs, when changing from the current system to a 7 year depreciation scheme with switchover from declining balance to straight line depreciation. Suggestions for further research to improve the analysis are given

  5. The impact of unit cost reductions on gross profit: Increasing or decreasing returns?

    Directory of Open Access Journals (Sweden)

    Ely Dahan

    2011-09-01

    Full Text Available We suggest that marketers actively participate in reducing unit costs during new product development, consistent with the theme of integrated marketing and manufacturing. Most marketing managers misjudge the impact on gross profit of reducing variable unit manufacturing costs, mistakenly believing that such cost reductions yield decreasing or linear returns while they actually generate increasing returns.

  6. Levelised unit electricity cost comparison of alternate technologies for baseload generation in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Ayres, M.; McRae, M.; Stogran, M.

    2004-08-15

    This report provides a comparison of the lifetime cost of constructing, operating and decommissioning new generation suitable for supplying baseload power by early in the next decade. New baseload generation options in Ontario are nuclear, coal-fired steam turbines or combined cycle gas turbines (CCGT). Nuclear and coal-fired units are characterised by high capital costs and low operating costs. As such, they are candidates for baseload operation only. Gas-fired generation is characterised by lower capital costs and higher operating costs and thus may meet the requirements for operation as peaking and/or baseload generation. The comparison of baseload generating technologies is made by reference to the estimated levelised unit electricity cost (LUEC). The LUEC can be thought of as a 'supply cost', where the unit cost is the price needed to recover all costs over the period. It is determined by finding the price that sets the sum of all future discounted cash flows (net present value, or NPV) to zero. It can also be thought of as representing the constant real wholesale price of electricity that meets the financing cost, debt repayment, income tax and cash flow constraints associated with the construction operation and decommissioning of a generating plant. Levelised unit cost comparisons are usually made with different sets of financing assumptions. This report considers two base cases, which we describe as 'merchant' and 'public' financing. The term 'merchant plant' is used to refer to ones that are built and operated by private investors. These investors pay for their capital through debt and by raising equity, and thus pay return on equity and interest on debt throughout their lifetime. These projects include income taxes, both provincial and federal. Publicly financed projects typically are not subject to income taxes or to the same constraints on raising finance through issuing debt and equity. However, they are

  7. Levelised unit electricity cost comparison of alternate technologies for baseload generation in Ontario

    International Nuclear Information System (INIS)

    Ayres, M.; McRae, M.; Stogran, M.

    2004-08-01

    This report provides a comparison of the lifetime cost of constructing, operating and decommissioning new generation suitable for supplying baseload power by early in the next decade. New baseload generation options in Ontario are nuclear, coal-fired steam turbines or combined cycle gas turbines (CCGT). Nuclear and coal-fired units are characterised by high capital costs and low operating costs. As such, they are candidates for baseload operation only. Gas-fired generation is characterised by lower capital costs and higher operating costs and thus may meet the requirements for operation as peaking and/or baseload generation. The comparison of baseload generating technologies is made by reference to the estimated levelised unit electricity cost (LUEC). The LUEC can be thought of as a 'supply cost', where the unit cost is the price needed to recover all costs over the period. It is determined by finding the price that sets the sum of all future discounted cash flows (net present value, or NPV) to zero. It can also be thought of as representing the constant real wholesale price of electricity that meets the financing cost, debt repayment, income tax and cash flow constraints associated with the construction operation and decommissioning of a generating plant. Levelised unit cost comparisons are usually made with different sets of financing assumptions. This report considers two base cases, which we describe as 'merchant' and 'public' financing. The term 'merchant plant' is used to refer to ones that are built and operated by private investors. These investors pay for their capital through debt and by raising equity, and thus pay return on equity and interest on debt throughout their lifetime. These projects include income taxes, both provincial and federal. Publicly financed projects typically are not subject to income taxes or to the same constraints on raising finance through issuing debt and equity. However, they are constrained to provide a rate of return. The

  8. Thunderstorm Algorithm for Determining Unit Commitment in Power System Operation

    Directory of Open Access Journals (Sweden)

    Arif Nur Afandi

    2016-12-01

    Full Text Available Solving the unit commitment problem is an important task in power system operation for deciding a balanced power production between various types of generating units under technical constraints and environmental limitations. This paper presents a new intelligent computation method, called the Thunderstorm Algorithm (TA, for searching the optimal solution of the integrated economic and emission dispatch (IEED problem as the operational assessment for determining unit commitment. A simulation using the IEEE-62 bus system showed that TA has smooth convergence and is applicable for solving the IEED problem. The IEED’s solution is associated with the total fuel consumption and pollutant emission. The proposed TA method seems to be a viable new approach for finding the optimal solution of the IEED problem.

  9. Analysis of Unit Process Cost for an Engineering-Scale Pyroprocess Facility Using a Process Costing Method in Korea

    Directory of Open Access Journals (Sweden)

    Sungki Kim

    2015-08-01

    Full Text Available Pyroprocessing, which is a dry recycling method, converts spent nuclear fuel into U (Uranium/TRU (TRansUranium metal ingots in a high-temperature molten salt phase. This paper provides the unit process cost of a pyroprocess facility that can process up to 10 tons of pyroprocessing product per year by utilizing the process costing method. Toward this end, the pyroprocess was classified into four kinds of unit processes: pretreatment, electrochemical reduction, electrorefining and electrowinning. The unit process cost was calculated by classifying the cost consumed at each process into raw material and conversion costs. The unit process costs of the pretreatment, electrochemical reduction, electrorefining and electrowinning were calculated as 195 US$/kgU-TRU, 310 US$/kgU-TRU, 215 US$/kgU-TRU and 231 US$/kgU-TRU, respectively. Finally the total pyroprocess cost was calculated as 951 US$/kgU-TRU. In addition, the cost driver for the raw material cost was identified as the cost for Li3PO4, needed for the LiCl-KCl purification process, and platinum as an anode electrode in the electrochemical reduction process.

  10. Control system for a nuclear power producing unit

    International Nuclear Information System (INIS)

    Durrant, O.W.

    1978-01-01

    The invention provides in a control system for a nuclear power producing unit comprising a pressurized water reactor, a once-through steam generator provided with feedwater supply means, a turbine-generator supplied with steam from the steam generator and means maintaining a flow of pressurized water through the reactor and steam generator. The combination comprising; means generating a feed forward control signal proportional to the desired power output of the power producing unit, a second means for adjusting the reactor heat release, a third means for adjusting the rate of flow of feedwater to the steam generator, the second and third means solely responsive to and operated in parallel from the feed forward control signal whereby the reactor heat release and the rate of flow of feedwater to the steam generator are each maintained in a discrete functional relationship to the feed forward control signal

  11. Governance Based on Cost Analysis (Unit Cost Analysis for Vocational Schools

    Directory of Open Access Journals (Sweden)

    Chandra Situmeang

    2018-02-01

    Full Text Available This study aims to calculate unit cost to produce one middle-level vocational school graduate (in Indonesian terms known as "Sekolah Menengah Kejuruan” abbreviated as SMK. The calculation is required because operational grant funds (in Indonesian terms known as antuan Operasional Sekolah abbreviated as BOS are distributed so far to the same extent in all areas of Indonesia and for all majors. This is most likely less than optimal because in fact there are very basic characteristics differences including; Economic capacity of each region, the cost standard for each region, and the type of department in the school. Based on this, the researcher assumed that cost analysis should be done by considering these things as a basis to provide BOS funds tailored to specific characteristics. The data to be analyzed in this research is North Sumatra province data. This research is conducted in two stages, which in this report only completed the first phase which is a survey in North Sumatra region. Stages of survey to obtain data which then analyzed with related data such as community income, learning outcomes through the value of national examinations, tuition fee, and conditions of learning facilities. The research is funded by the ministries of research, technology and higher education through competing grant schemes for fiscal year 2017 and 2018. The result of correlation analysis between the variables shows that there is a strong relationship between the average income with average tuition paid by the community and between average tuition paid by the community with Quality Level of Education Facilities. The result of correlation analysis also shows a moderate relationship between the average tuition with learning outcomes measured through average national exam and relationship between quality level of education facilities with average national exam. While the relationship between average income with average national exam does not have a strong

  12. Activities at the electric power research institute to support the modernization of instrumentation and control systems in nuclear power plants in the United States of America

    International Nuclear Information System (INIS)

    Naser, J.

    1998-01-01

    Most nuclear power plants in the United States are operating with a vast majority of their original analog instrumentation and control (I and C) equipment. Many of the I and C systems in the plants need to be modernized in a reliable and cost-effective manner to replace obsolete equipment, to reduce operating and maintenance (O and M) costs, to improve plant performance, and to maintain safety. The major drivers for the replacement of the safety, control, and information systems in nuclear power plants are the obsolescence of the existing hardware and the need for more cost-effective power production. Competition between power producers is dictating the need for more cost-effective power production. The increasing O and M costs to maintain systems experiencing obsolescence problems is counter to the needs for more cost-effective power production and improved competitiveness. Modern technology, especially digital systems, offers improved functionality, performance, and reliability; solutions to obsolescence of equipment; reduction in O and M costs, and the potential to enhance safety. Digital I and C systems with their inherent advantages will be implemented only if reliable and cost-effective implementation and licensing acceptance is achieved and if the modernized system supports reduced power production costs. Increasing competition will continue to be a major factor in the operation of nuclear power plants. I will continue to dictate the need for improved productivity and cost-effectiveness. EPRI and its members utilities are working together on an industry-wide Instrumentation and Control Program to address I and C issues and to develop cost-effective solutions. (author)

  13. Cost estimation of thermal and nuclear power using annual securities report

    International Nuclear Information System (INIS)

    Matsuo, Yuji; Nagatomi, Yu; Murakami, Tomoko

    2011-01-01

    Cost estimation of generation cost derived from various power sources was widely conducted using model plant or annual securities report of electric utilities. Although annual securities report method was subjected to some limitation in methodology itself, useful information was obtained for cost comparison of thermal and nuclear power. Studies on generation cost evaluation of thermal and nuclear power based on this method during past five years showed that nuclear power cost was almost stable 7 Yen/kWh and thermal power cost was varying 9 - 12 Yen/kWh dependent on violent fluctuations of primary energy cost. Nuclear power was expected cost increase due to enhanced safety requirements or damage compensation of accidents as well as decommissioning and back-end cost, which were difficult to evaluate accurately with annual securities report. Further comprehensive and accurate cost estimation should be encouraged including these items. (T. Tanaka)

  14. User's manual for levelized power generation cost using an IBM PC

    International Nuclear Information System (INIS)

    Fuller, L.C.

    1985-06-01

    Programs for the estimation of levelized electric power generation costs using the BASIC interpreter on an IBM PC are described. Procedures for light-water reactor plants and coal-fired plants include capital investment cost, operation and maintenance cost, fuel cycle cost, nuclear decommissioning cost, and levelized total generation cost

  15. Decommissioning costs of WWER-440 nuclear power plants. Interim report: Data collection and preliminary evaluations

    International Nuclear Information System (INIS)

    2002-11-01

    Based on the interest in decommissioning costs within Member States, especially in WWER- 440 operating countries that face the complex decision about continued operation vs. decommissioning in the near future, the IAEA launched the task to prepare a technical document on decommissioning costs of WWER-440 nuclear power plants. The main objectives of this publication were to present the decommissioning costs of WWER-440 NPPs in a uniform manner, i.e. using the cost item and cost group system of the Interim Technical Document on Nuclear Decommissioning 'A Proposed Standardised List of Items for Costing Purposes' developed jointly by the EC, the IAEA and the OECD Nuclear Energy Agency (NEA), and providing, as such, a basis for understanding decommissioning costs differences. Member States operating WWER-440 NPPs or having such units under shutdown or even under decommissioning conditions have been requested to provide cost estimates and other input data in order to facilitate understanding of their cost figures. Both decommissioning options, i.e. immediate decommissioning and safe enclosure, have been considered. In the aforementioned joint Interim Technical Document, cost items related to activities that are carried out with a similar emphasis, whether or not tied to a similar time schedule for decommissioning, or that are based on overall activities that cannot be categorised in a specific time period, are grouped as follows: pre-decommissioning actions; facility shutdown activities; procurement of general equipment and material; dismantling activities; waste processing, storage and disposal; site security, surveillance and maintenance; site restoration, cleanup and landscaping; project management, engineering and site support; research and development; fuel and nuclear material; other costs. Before starting implementation of the study, agreement was obtained on general financial, technical and social boundary conditions that should be used in order to facilitate

  16. Canadian nuclear power plant construction cost forecast and analysis

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequence of the decision as possible. This understanding must be provided by the evaluation of the situation to take place in the future. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A data base is built and indexes are prepared. Based on these indexes an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of forty years are generated and applications of alternative scenario forecasts and range forecasts to uncertainty assessment are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the very first ever done for Canadian NGS constructions

  17. Cost/benefit assessment in electric power systems

    International Nuclear Information System (INIS)

    Oteng-Adjei, J.

    1990-01-01

    The basic function of a modern power system is to satisfy the system load requirements as economically as possible and with a reasonable assurance of continuity and quality. The question of what is reasonable can be examined in terms of the costs and the worth to the consumer associated with providing an adequate supply. The process of preparing reliability worth estimates based on customer cost-of-interruption data is presented. These data can be derived for a particular utility service area and are used to determine appropriate customer damage functions. These indicators can be used with the basic loss of energy expectation (LOEE) index to obtain a factor that can be utilized to relate the customer losses to the worth of electric service reliability. This factor is designated as the interrupted energy assessment rate (IEAR). The developed IEAR values can be utilized in both generating capacity and composite generation and transmission system assessment. Methods for using these estimates in power system optimization at the planning stages are described and examples are used to illustrate the procedures. 106 refs., 77 figs., 64 tabs

  18. On economic efficiency of nuclear power unit life extension using steam-gas topping plant

    International Nuclear Information System (INIS)

    Kuznetsov, Y.N.; Lisitsa, F.D.; Smirnov, V.G.

    2001-01-01

    The different options for life extension of the operating nuclear power units have been analyzed in the report with regard for their economic efficiency. A particular attention is given to the option envisaging the reduction of reactor power output and its subsequent compensation with a steam-gas topping plant. Steam generated at its heat-recovery boilers is proposed to be used for the additional loading of the nuclear plant turbine so as to reach its nominal output. It would be demonstrated that the implementation of this option allows to reduce total costs in the period of power plant life extension by 24-29% as compared with the alternative use of the replacing steam-gas unit and the saved resources could be directed, for instance, for decommissioning of a reactor facility. (authors)

  19. Inventory of power plants in the United States, 1993

    International Nuclear Information System (INIS)

    1994-12-01

    The Inventory of Power Plants in the United States is prepared annually by the Survey Management Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), U.S. Department of Energy (DOE). The purpose of this publication is to provide year-end statistics about electric generating units operated by electric utilities in the United States (the 50 States and the District of Columbia). The publication also provides a 10-year outlook of future generating unit additions. Data summarized in this report are useful to a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. Data presented in this report were assembled and published by the EIA to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended

  20. Accident analysis of Fukushima Daiichi Nuclear Power Station unit 1

    International Nuclear Information System (INIS)

    Kobayashi, Masahide; Narabayashi, Tadashi; Tsuji, Masashi; Chiba, Go; Nagata, Yasunori; Shimoe, Tomohiro

    2015-01-01

    As a result of the Great East Japan Earthquake that occurred on 11 March 2011, all AC and DC power at the Fukushima Daiichi NPP units 1 to 3 were lost soon after the tsunami. The core cooling function was lost, and the cores of units 1 to 3 were damaged. The purpose of this work is to clarify the progress of the accident in unit 1, which was damaged the earliest among the 3 units. Therefore, an original severe accident analysis code was developed, and the progress of the accident was evaluated from the analysis results and the actual data. As a result, the leakage path from a pressure vessel was clarified, and some lessons and knowledge were gained. (author)

  1. Inventory of power plants in the United States, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Inventory of Power Plants in the United States is prepared annually by the Survey Management Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), U.S. Department of Energy (DOE). The purpose of this publication is to provide year-end statistics about electric generating units operated by electric utilities in the United States (the 50 States and the District of Columbia). The publication also provides a 10-year outlook of future generating unit additions. Data summarized in this report are useful to a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. Data presented in this report were assembled and published by the EIA to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

  2. Controlling engineering project changes for multi-unit, multi-site standardized nuclear power plants

    International Nuclear Information System (INIS)

    Randall, E.; Boddeker, G.; McGugin, H.; Strother, E.; Waggoner, G.

    1978-01-01

    Multibillioin dollar multiple nuclear power plant projects have numerous potential sources of engineering changes. The majority of these are internally generated changes, client generated changes, and changes from construction, procurement, other engineering organizations, and regulatory organizations. For multiunit, multisite projects, the use of a standardized design is cost effective. Engineering changes can then be controlled for a single standardized design, and the unit or site unique changes can be treated as deviations. Once an effective change procedure is established for change control of the standardized design, the same procedures can be used for control of unit or site unique changes

  3. Hydropower Impacts on Electrical System Production Costs in the Southwest United States

    Directory of Open Access Journals (Sweden)

    Dominique M. Bain

    2018-02-01

    Full Text Available The Colorado River is an important natural resource for the Southwestern United States. Predicted climate change impacts include increased temperature, decreased rainfall and increased probability of drought in this region. Given the large amount of hydropower on the Colorado River and its importance to the bulk electricity system, this purpose of this study was to quantify the value hydropower in operating the electrical system, and examined changes in hydropower value and electricity costs under different possible future drought conditions and regional generation scenarios. The goal was to better understand how these scenarios affect operating costs of the bulk electrical system, as well as the value of the hydropower produced, and proposed a method for doing so. The calculated value of the hydroelectric power was nearly double the mean locational marginal price in the study area, about $73 to $75 for most scenarios, demonstrating a high value of the hydropower. In general, it was found that reduced water availability increased operating costs, and increased the value of the hydropower. A calculated value factor showed that when less hydroelectric power is available, the hydropower is more valuable. Furthermore, the value factor showed that the value of hydro increases with the addition of solar or the retirement of thermal generating resources.

  4. Main unit electrical protection at Sizewell 'B' power station

    International Nuclear Information System (INIS)

    Fischer, A.; Keates, T.

    1992-01-01

    For any power station, reliable electrical protection of the main generating units (generators plus generator transformers) has important commercial implications. Spurious trips cause loss of generation and consequent loss of revenue, while failure to rapidly isolate a fault leads to unnecessary damage and again, loss of generation and revenue. While these conditions apply equally to Sizewell B there are additional factors to be taken into consideration. A spurious trip of a main generating unit may lead to a trip of the reactor with an associated challenge to the shutdown and core cooling plant. The generator transformers, besides exporting power from the generators to the 400 kV National Grid, also import power from the Grid to the 11 kV Main Electrical System, which in turn is the preferred source of supply to the Essential Electrical System. The Main Unit Protection is designed to clear generator faults leaving this off-site power route intact. Hence failure to operate correctly could affect the integrity of the Essential Electrical Supplies. (Author)

  5. The Future Potential of Waver Power in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Mirko Previsic; Jeff Epler; Maureen Hand; Donna Heimiller; Walter Short; Kelly Eurek

    2012-09-20

    The theoretical ocean wave energy resource potential exceeds 50% of the annual domestic energy demand of the United States, is located close to coastal population centers, and, although variable in nature, may be more consistent and predictable than some other renewable generation technologies. As a renewable electricity generation technology, ocean wave energy offers a low air pollutant option for diversifying the U.S. electricity generation portfolio. Furthermore, the output characteristics of these technologies may complement other renewable technologies. This study addresses the following: (1) The theoretical, technical and practical potential for electricity generation from wave energy (2) The present lifecycle cost profile (Capex, Opex, and Cost of Electricity) of wave energy conversion technology at a reference site in Northern California at different plant scales (3) Cost of electricity variations as a function of deployment site, considering technical, geo-spatial and and electric grid constraints (4) Technology cost reduction pathways (5) Cost reduction targets at which the technology will see significant deployment within US markets, explored through a series of deployment scenarios RE Vision Consulting, LLC (RE Vision), engaged in various analyses to establish current and future cost profiles for marine hydrokinetic (MHK) technologies, quantified the theoretical, technical and practical resource potential, performed electricity market assessments and developed deployment scenarios. RE Vision was supported in this effort by NREL analysts, who compiled resource information, performed analysis using the ReEDSa model to develop deployment scenarios, and developed a simplified assessment of the Alaska and Hawaii electricity markets.

  6. Low-cost RAU with Optical Power Supply Used in a Hybrid RoF IEEE 802.11 Network

    Science.gov (United States)

    Kowalczyk, M.; Siuzdak, J.

    2014-09-01

    The paper presents design and implementation of a low-cost RAU (Remote Antenna Unit) device. It was designed to work in a hybrid Wi-Fi/optical network based on the IEEE 802.11b/g standard. An unique feature of the device is the possibility of optical power supply.

  7. Inventory of Power Plants in the United States, October 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-27

    The Inventory of Power Plants in the United States is prepared annually by the Survey Management Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), US Department of Energy (DOE). The purpose of this publication is to provide year-end statistics about electric generating units operated by electric utilities in the United States (the 50 States and the District of Columbia). The publication also provides a 10-year outlook of future generating unit additions. Data summarized in this report are useful to a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. Data presented in this report were assembled and published by the EIA to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. The report is organized into the following chapters: Year in Review, Operable Electric Generating Units, and Projected Electric Generating Unit Additions. Statistics presented in these chapters reflect the status of electric generating units as of December 31, 1992.

  8. Direct cost analysis of intensive care unit stay in four European countries: applying a standardized costing methodology.

    Science.gov (United States)

    Tan, Siok Swan; Bakker, Jan; Hoogendoorn, Marga E; Kapila, Atul; Martin, Joerg; Pezzi, Angelo; Pittoni, Giovanni; Spronk, Peter E; Welte, Robert; Hakkaart-van Roijen, Leona

    2012-01-01

    The objective of the present study was to measure and compare the direct costs of intensive care unit (ICU) days at seven ICU departments in Germany, Italy, the Netherlands, and the United Kingdom by means of a standardized costing methodology. A retrospective cost analysis of ICU patients was performed from the hospital's perspective. The standardized costing methodology was developed on the basis of the availability of data at the seven ICU departments. It entailed the application of the bottom-up approach for "hotel and nutrition" and the top-down approach for "diagnostics," "consumables," and "labor." Direct costs per ICU day ranged from €1168 to €2025. Even though the distribution of costs varied by cost component, labor was the most important cost driver at all departments. The costs for "labor" amounted to €1629 at department G but were fairly similar at the other departments (€711 ± 115). Direct costs of ICU days vary widely between the seven departments. Our standardized costing methodology could serve as a valuable instrument to compare actual cost differences, such as those resulting from differences in patient case-mix. Copyright © 2012 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  9. Changing Perceptions of Nuclear Power in The United States

    International Nuclear Information System (INIS)

    Taylor, John

    1989-01-01

    Although many new nuclear power plants have been brought on line in that time, resulting in a capacity of 110 plants with operating permits and another twelve in the last stages of completion, all of these plants were authorized before 1978. The fundamental reason for this moratorium in new orders was the precipitous reduction in electricity demand, arising from the OPEC embargo and Iran revolution, which created excess electric capacity throughout the United States. In fact, many nuclear and coal plants were cancelled to minimize the over capacity problem and no large base load generating units have been ordered of any kind in the past decade. So the 'moratorium' is not really unique to nuclear power. Progress, coupled with increased awareness that nuclear power is one of the keys to solving atmospheric environmental problems, will swing political and public acceptance back to being favorable. Successful progress in these matters will be of benefit to public acceptance around the world and, conversely, serious technical difficulties, particularly entailing any major incident with a nuclear power plants anywhere in the world, will adversely affect the improvement in political and public acceptance in the United States. It is vitally important, therefore, that we continue to further enhance international cooperation in nuclear power. We are pleased the Korea Electric power Corporation and the Korea Advanced Energy Research Institute are participating in EPRI development programs, and hope that cooperation will increase in the future. We're most encouraged by the formation of the World Association of Nuclear Operators, which will be initiated in Moscow next month. The nuclear electric utilities and their governments around the world, the International Atomic Energy Agency, and the Nuclear Energy Agency of OECD should be commended for their initiative in international cooperation

  10. ABC estimation of unit costs for emergency department services.

    Science.gov (United States)

    Holmes, R L; Schroeder, R E

    1996-04-01

    Rapid evolution of the health care industry forces managers to make cost-effective decisions. Typical hospital cost accounting systems do not provide emergency department managers with the information needed, but emergency department settings are so complex and dynamic as to make the more accurate activity-based costing (ABC) system prohibitively expensive. Through judicious use of the available traditional cost accounting information and simple computer spreadsheets. managers may approximate the decision-guiding information that would result from the much more costly and time-consuming implementation of ABC.

  11. Costs of occupational injuries in construction in the United States.

    Science.gov (United States)

    Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Haile, Elizabeth; Men, Yurong

    2007-11-01

    This paper presents costs of fatal and nonfatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and nonfatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry's total fatal and nonfatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs.

  12. High Power Alternator Test Unit (ATU) Electrical System Test

    Science.gov (United States)

    Birchenough, Arthur; Hervol, David

    2007-01-01

    The Alternator Test Unit (ATU) in the Lunar Power System Facility (LPSF) located at the NASA Glenn Research Center (GRC) in Cleveland, OH was used to simulate the operating conditions and evaluate the performance of the ATU and it s interaction with various LPSF components in accordance with the JIMO AC Power System Requirements. The testing was carried out at the breadboard development level. Results of these tests will be used for the development and validation of analytical models for performance and lifetime prediction.

  13. Nuclear power reactor licensing and regulation in the United States

    International Nuclear Information System (INIS)

    Shapar, H.K.

    1979-01-01

    The report is devoted to four subjects: an explanation of the origins, statutory basis and development of the present regulatory system in the United States; a description of the various actions which must be taken by a license applicant and by the Nuclear Regulatory Commission before a nuclear power plant can be constructed and placed on-line, an account of the current regulatory practices followed by the US NRC in licensing nuclear power reactors; an identification of some of the 'lessons learned' from the Three Mile Island accident and some proposed regulatory and legislative solutions. (NEA) [fr

  14. New generation nuclear power units of PWR type integral reactors

    International Nuclear Information System (INIS)

    Mitenkov, F.M.; Kurachen Kov, A.V.; Malamud, V.A.; Panov, Yu.K.; Runov, B.I.; Flerov, L.N.

    1997-01-01

    Design bases of new generation nuclear power units (nuclear power plants - NPP, nuclear co-generation plants - NCP, nuclear distract heating plants - NDHP), using integral type PWPS, developed in OKBM, Nizhny Novgorod and trends of design decisions optimization are considered in this report. The problems of diagnostics, servicing and repair of the integral reactor components in course of operation are discussed. The results of safety analysis, including the problems of several accident localization with postulated core melting and keeping corium in the reactor vessel and guard vessel are presented. Information on experimental substantiation of the suggested plant design decisions is presented. (author)

  15. Competitive bidding for independent power: developments in the United States

    International Nuclear Information System (INIS)

    Kliman, M.

    1995-01-01

    In the United States electric utilities are using competitive bidding programs to procure power supplies from non-utility generators and, in some cases, to establish contracts with energy service companies for the implementation of demand-side management projects. Such programs are viewed as a path to efficient contracts in the private power industry. But bidding programs are complex, subject to pitfalls, and are developing very quickly. This paper reports on that development as of the early 1990s and, as an illustration, briefly describes and analyzes the bidding program of an electric utility in the State of New York. (author). 2 tabs

  16. Primary shutdown system monitoring unit for nuclear power plants

    International Nuclear Information System (INIS)

    Khan, Tahir Kamal; Balasubramanian, R.; Agilandaeswari, K.

    2013-01-01

    Shut off rods made up of neutron absorbing material are used as Primary Shutdown System. To reduce the power of the reactor under certain abnormal operating conditions, these rods must go down into the core within a specified time. Any malfunctioning in the movement of rods cannot be tolerated and Secondary Shutdown System (SSS) must be actuated within stipulated time to reduce the reactor power. A special safety critical, hardwired electronics unit has been designed to detect failure of PSS Shut off rods movements and generate trip signals for initiating SSS. (author)

  17. Contingency-Constrained Unit Commitmentin Meshed Isolated Power Systems

    DEFF Research Database (Denmark)

    Sokoler, Leo Emil; Vinter, Peter; Bærentsen, Runi

    2015-01-01

    is kept above a predefined limit in the event of a contingency. The minimum frequency constraints are formulated using novel sufficient conditions that take into account the system inertia and the dynamics of the power generators. The proposed sufficient conditions are attractive from both a computational...... and a modelling point of view. We compare the ORPP to a unit commitment problem that only considers the stationary behavior of the frequency. Simulations based on a Faroe Islands case study show that, without being overly conservative, potential blackouts and power outages can be avoided using the ORPP...

  18. Research on unit commitment with large-scale wind power connected power system

    Science.gov (United States)

    Jiao, Ran; Zhang, Baoqun; Chi, Zhongjun; Gong, Cheng; Ma, Longfei; Yang, Bing

    2017-01-01

    Large-scale integration of wind power generators into power grid brings severe challenges to power system economic dispatch due to its stochastic volatility. Unit commitment including wind farm is analyzed from the two parts of modeling and solving methods. The structures and characteristics can be summarized after classification has been done according to different objective function and constraints. Finally, the issues to be solved and possible directions of research and development in the future are discussed, which can adapt to the requirements of the electricity market, energy-saving power generation dispatching and smart grid, even providing reference for research and practice of researchers and workers in this field.

  19. Cost effective decommissioning and dismantling of nuclear power plants

    International Nuclear Information System (INIS)

    Wasinger, Karl

    2012-01-01

    As for any large and complex project, the basis for cost effective decommissioning and dismantling of nuclear power plants is established with the development of the project. Just as its construction, dismantling of a nuclear power plant is similarly demanding. Daily changing situations due to the progress of construction - in the present case progress of dismantling - result in significant logistical challenges for project managers and site supervisors. This will be aggravated by the fact that a considerable amount of the removed parts are contaminated or even activated. Hence, not only occupational health, safety and environmental protection is to be assured, employees, public and environment are to be adequately protected against the adverse effect of radioactive radiation as well. Work progress and not least expenses involved with the undertaking depend on adherence to the planned course of actions. Probably the most frequent cause of deviation from originally planned durations and costs of a project are disruptions in the flow of work. For being enabled to counteract in a timely and efficient manner, all required activities are to be comprehensively captured with the initial planning. The effect initial activities may have on subsequent works until completion must particularly be investigated. This is the more important the larger and more complex the project actually are. Comprehensive knowledge of all the matters which may affect the progress of the works is required in order to set up a suitable work break-down structure; such work break-down structure being indispensable for successful control and monitoring of the project. In building the related organizational structure of the project, all such stakeholders not being direct part of the project team but which may potentially affect the progress of the project are to be considered as well. Cost effective and lost time injury free dismantling of decommissioned nuclear power plants is based on implementing

  20. Handbook for cost estimating. A method for developing estimates of costs for generic actions for nuclear power plants

    International Nuclear Information System (INIS)

    Ball, J.R.; Cohen, S.; Ziegler, E.Z.

    1984-10-01

    This document provides overall guidance to assist the NRC in preparing the types of cost estimates required by the Regulatory Analysis Guidelines and to assist in the assignment of priorities in resolving generic safety issues. The Handbook presents an overall cost model that allows the cost analyst to develop a chronological series of activities needed to implement a specific regulatory requirement throughout all applicable commercial LWR power plants and to identify the significant cost elements for each activity. References to available cost data are provided along with rules of thumb and cost factors to assist in evaluating each cost element. A suitable code-of-accounts data base is presented to assist in organizing and aggregating costs. Rudimentary cost analysis methods are described to allow the analyst to produce a constant-dollar, lifetime cost for the requirement. A step-by-step example cost estimate is included to demonstrate the overall use of the Handbook

  1. Future wind power forecast errors, need for regulating power, and costs in the Swedish system

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Fredrik [Vattenfall Research and Development AB, Stockholm (Sweden). Power Technology

    2011-07-01

    Wind power is one of the renewable energy sources in the electricity system that grows most rapid in Sweden. There are however two market challenges that need to be addressed with a higher proportion of wind power - that is variability and predictability. Predictability is important since the spot market Nord Pool Spot requires forecasts of production 12 - 36 hours ahead. The forecast errors must be regulated with regulating power, which is expensive for the actors causing the forecast errors. This paper has investigated a number of scenarios with 10 - 55 TWh of wind power installed in the Swedish system. The focus has been on a base scenario with 10 TWh new wind power consisting of 3,5 GW new wind power and 1,5 GW already installed power, which gives 5 GW. The results show that the costs for the forecast errors will increase as more intermittent production is installed. However, the increase can be limited by for instance trading on intraday market or increase quality of forecasts. (orig.)

  2. Incorporating Wind Power Forecast Uncertainties Into Stochastic Unit Commitment Using Neural Network-Based Prediction Intervals.

    Science.gov (United States)

    Quan, Hao; Srinivasan, Dipti; Khosravi, Abbas

    2015-09-01

    Penetration of renewable energy resources, such as wind and solar power, into power systems significantly increases the uncertainties on system operation, stability, and reliability in smart grids. In this paper, the nonparametric neural network-based prediction intervals (PIs) are implemented for forecast uncertainty quantification. Instead of a single level PI, wind power forecast uncertainties are represented in a list of PIs. These PIs are then decomposed into quantiles of wind power. A new scenario generation method is proposed to handle wind power forecast uncertainties. For each hour, an empirical cumulative distribution function (ECDF) is fitted to these quantile points. The Monte Carlo simulation method is used to generate scenarios from the ECDF. Then the wind power scenarios are incorporated into a stochastic security-constrained unit commitment (SCUC) model. The heuristic genetic algorithm is utilized to solve the stochastic SCUC problem. Five deterministic and four stochastic case studies incorporated with interval forecasts of wind power are implemented. The results of these cases are presented and discussed together. Generation costs, and the scheduled and real-time economic dispatch reserves of different unit commitment strategies are compared. The experimental results show that the stochastic model is more robust than deterministic ones and, thus, decreases the risk in system operations of smart grids.

  3. Dynamic Analysis & Characterization of Conventional Hydraulic Power Supply Units

    DEFF Research Database (Denmark)

    Schmidt, Lasse; Liedhegener, Michael; Bech, Michael Møller

    2016-01-01

    Hydraulic power units operated as constant supply pres-sure systems remain to be widely used in the industry, to supply valve controlled hydraulic drives etc., where the hydraulic power units are constituted by variable pumps with mechanical outlet pressure control, driven by induction motors....... In the analysis of supplied drives, both linear and rotary, emphasis is commonly placed on the drives themselves and the related loads, and the supply system dynamics is often given only little attention, and usually neglected or taken into account in a simplified fashion. The simplified supply system dynamics...... and drives will reduce the flow-to-pressure gain of the supply system, and hence increase the time constant of the sup-ply pressure dynamics. A consequence of this may be large vari-ations in the supply pressure, hence large variations in the pump shaft torque, and thereby the induction motor load torque...

  4. Simulator of nuclear power plant with WWER-440 units

    International Nuclear Information System (INIS)

    Krcek, V.

    1985-01-01

    The use is discussed of simulators in the training of qualified personnel for the construction and operation of nuclear power plants. Simulators are used for training all activities and thinking processes related to the control of a nuclear reactor in the course of quasi-steady and non-steady states. The development and implementation is summed up of the construction of such a simulator for WWER-440 nuclear power plants. The main parts of the simulator include the unit control room, the computer system, the teacher's workplace and the interface system. The possibility of simulating the functions of the unit for personnel training is based on the description of the behaviour of the simulated object in form of mathematical models of its basic technological subsystems and their interrelations within the range of operating patterns. (J.C.)

  5. Inventory of power plants in the United States: December 1979

    International Nuclear Information System (INIS)

    Gilliam, L.R.

    1980-01-01

    This 1979 inventory of power plants provides a comprehensive list of existing, standby, out-of-service, retired and projected electric generating plants in the U.S. Arranged under the broad sections of existing, jointly owned and projected units, tabulated data on individual plants in each state are presented. These data include unit name, location, type, MW rating, primary fuel, alternative fuel, status, year built, and whether or not it is jointly owned. Jointly owned plants are separately identified as to the percent of ownership belonging to named owners. Projected plants have data on plant characteristics, current status and scheduled completion date. Summaries of the total number of each type of power plant in each state are also provided

  6. AN AIRPLANE WITH UNCONVENTIONALLY PLACED PROPELLER POWER UNIT

    Directory of Open Access Journals (Sweden)

    Jan Červinka

    2017-02-01

    Full Text Available The significance of the influence of operating propellers on the aircraft aerodynamic characteristics is well-known. Wind tunnel testing of an airplane model with operating propellers is a complex task regarding the required similarity of the full-scale and the model case. Matching sufficient similarity in axial and rotational velocities in the propeller slipstream is the primordial condition for the global aerodynamic similarity of the windtunnel testing. An example of the model power units with related devices is presented. Examples of the wind tunnel testing results illustrate the extent of the propeller influence on aerodynamic characteristics of an aircraft of unconventional configuration with power units positioned at the fuselage afterbody.

  7. Evaluation of Perry Nuclear Power Plant Unit 1 technical specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-11-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Perry Nuclear Power Plant Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the requirements of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Perry T/S. Several discrepancies were identified and subsequently resolved through telephone conversations with the staff reviewer and the utility representative. Pending completion of the resolutions noted in Parts 3 and 4 of this report, the Perry Nuclear Power Plant Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  8. Evaluation of Shoreham Nuclear Power Station, Unit 1 technical specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-08-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Shoreham Nuclear Power Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumptions of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Shoreham T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Shoreham Nuclear Power Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  9. Managing the higher risks of low-cost high-efficiency advanced power generation technologies

    International Nuclear Information System (INIS)

    Pearson, M.

    1997-01-01

    Independent power producers operate large coal-fired installations and gas turbine combined-cycle (GTCC) facilities. Combined cycle units are complex and their reliability and availability is greatly influenced by mechanical, instrumentation and control weaknesses. It was suggested that these weaknesses could be avoided by tighter specifications and more rigorous functional testing before acceptance by the owner. For the present, the difficulties of developing reliable, lower installed cost/kw, more efficient GTCC designs, pressure for lower NO x emissions with 'dry' combustors continue to be the most difficult challenges for all GT manufacturers

  10. A geographically resolved method to estimate levelized power plant costs with environmental externalities

    International Nuclear Information System (INIS)

    Rhodes, Joshua D.; King, Carey; Gulen, Gürcan; Olmstead, Sheila M.; Dyer, James S.; Hebner, Robert E.; Beach, Fred C.; Edgar, Thomas F.; Webber, Michael E.

    2017-01-01

    In this analysis we developed and applied a geographically-resolved method to calculate the Levelized Cost of Electricity (LCOE) of new power plants on a county-by-county basis while including estimates of some environmental externalities. We calculated the LCOE for each county of the contiguous United States for 12 power plant technologies. The minimum LCOE option for each county varies based on local conditions, capital and fuel costs, environmental externalities, and resource availability. We considered ten scenarios that vary input assumptions. We present the results in a map format to facilitate comparisons by fuel, technology, and location. For our reference analysis, which includes a cost of $62/tCO_2 for CO_2 emissions natural gas combined cycle, wind, and nuclear are most often the lowest-LCOE option. While the average cost increases when internalizing the environmental externalities (carbon and air pollutants) is small for some technologies, the local cost differences are as high as $0.62/kWh for coal (under our reference analysis). These results display format, and online tools could serve as an educational tool for stakeholders when considering which technologies might or might not be a good fit for a given locality subject to system integration considerations. - Highlights: • We propose a method to add externalities to LCOE. • We present the least cost technology for every county in the US. • The cheapest technology depends on many characteristics of that locale. • We present online tools for users to change our assumptions. • Our tools are useful in discussing the impact of policy on the cost of electricity.

  11. Photovoltaic power stations in Germany and the United States: A comparative study by data envelopment analysis

    International Nuclear Information System (INIS)

    Sueyoshi, Toshiyuki; Goto, Mika

    2014-01-01

    gases. However, the FIT poses a large financial burden to consumers with a massive increase in renewable energy installation like in Germany and Spain. Therefore, it is necessary for the United States to consider how to align a policy with a speed of technology innovation to balance between the benefit and the cost derived from the policy implementation on renewable energy. In addition, this study discusses policy issues regarding cost allocation due to FIT among stakeholders related to the electric power industry. At the end, this study proposes a new type of wholesale electricity market that provides simultaneous trading on electricity and greenhouse gas emissions by fully utilizing modern computer science technology that exists in universities and national laboratories of the United States. - Highlights: • This study compares photovoltaic power stations in Germany and the United States. • A total of one hundred sixty PV power stations are used for the international comparison. • Germany is more efficient than the United States in terms of solar and land usages. • Feed-In Tariff (FIT) may be effective at the state level in the United States

  12. Nuclear power and deregulation in the United Kingdom. Chapter 3

    International Nuclear Information System (INIS)

    Thomas, S.

    2001-01-01

    This article (Chapter Three) reviews the development of the British nuclear industry and the country's experience with privatised and liberalized electricity markets - an experience that is much earlier than Canada's. The U.K. industry is of special interest because a British firm, British Energy, has leased the Bruce A and B nuclear stations until 2018. This article tries to explain how the economic transformation of nuclear power has been achieved, and why nuclear power and a competitive electricity market are so hard to reconcile. The article gives a brief history of nuclear power in Britain up to 1987; a summary of the main events relating to nuclear power; a discussion of why nuclear power could not be privatised in 1990, but could be in 1996; examines the improvements in cost and competitiveness since 1990; a discussion of the issues surrounding the discharge of nuclear liabilities; the future for British Energy, Britain's leading nuclear company, and nuclear power in Britain; and finally, changes to other nuclear companies in Britain

  13. Costing and pricing electric power reserve services. Final report

    International Nuclear Information System (INIS)

    Kirsch, L.D.; Rajaraman, R.; Clark, C.

    1997-12-01

    In the competitive electric power markets of the imminent future, reserves will be the second largest generation service in terms of their revenues and profits. Because reserves will be more widely traded than at present, they will be provided by the cheapest available sources regardless of the ownership of those sources. Price will determine the willingness of generators and consumers to provide reserve services; and it may also determine the willingness of reserve users to purchase reserve services. This report presents a methodology by which generation firms and merchant firms can profitably cost and price the reserve services that they offer. The methodology is generally applicable to a wide range of market structures that such firms might face

  14. Cost estimate of a nuclear power phaseout in Germany

    International Nuclear Information System (INIS)

    Schmitt, D.

    1999-01-01

    Nuclear power phaseout costing is an extremely complex task, as a multitude of aspects affecting the economy at large as well as specific industrial branches, and both direct and indirect effects are to be identified and considered. Another question arising is the general approach to be taken, as such an estimate may be done e.g. from the angle of an electric utility, or the electricity consumers, tax payers, or that of the national economy. In addition, the strategy and time frame of the phaseout scenario play a major role, which is a decision of policy. The article discusses a number of approaches as addressed above and emphasises that any approach or scenario elaborated is based on very different, specific assumptions requiring individual interpretation of results plus supplementary parameter variation and sensitivity calculations. (orig./CB) [de

  15. Reduction of operations and maintenance costs at geothermal power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bruton, C.J.; Stevens, C.G.; Rard, J.A.; Kasameyer, P.W. [Lawrence Livermore National Lab., CA (United States)

    1997-12-31

    To reduce chemical costs at geothermal power plants, we are investigating: (a) improved chemical processes associated with H{sub 2}S abatement techniques, and (b) the use of cross dispersive infrared spectrometry to monitor accurately, reliably, and continuously H{sub 2}S emissions from cooling towers. The latter is a new type of infrared optical technology developed by LLNL for non-proliferation verification. Initial work is focused at The Geysers in cooperation with Pacific Gas and Electric. Methods for deploying the spectrometer on-site at The Geysers are being developed. Chemical analysis of solutions involved in H{sub 2}S abatement technologies is continuing to isolate the chemical forms of sulfur produced.

  16. 76 FR 1469 - Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2011-01-10

    ... Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Environmental Assessment... Plant, LLC, the licensee, for operation of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2... Impact Statement for License Renewal of Nuclear Plants, Calvert Cliffs Nuclear Power Plant (NUREG-1437...

  17. 75 FR 66802 - Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2010-10-29

    ... Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2; Notice of Withdrawal of...) has granted the request of Calvert Cliffs Nuclear Power Plant, LLC, the licensee, to withdraw its... for the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, located in Calvert County, MD. The...

  18. Inventory of power plants in the United States 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-18

    The Inventory of Power Plants in the US provides year-end statistics on generating units operated by electric utilities in the US (the 50 States and the District of Columbia). Statistics presented in this report reflect the status of generating units as of December 31, 1994. The publication also provides a 10-year outlook for generating unit additions. This report is prepared annually by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy (DOE). Data summarized in this report are useful to a wide audience including Congress, Federal, and State agencies; the electric utility industry; and the general public. This is a report of electric utility data; in cases where summary data of nonutility capacity are presented, it is specifically noted as such.

  19. Counter rotating type hydroelectric unit suitable for tidal power station

    International Nuclear Information System (INIS)

    Kanemoto, T; Suzuki, T

    2010-01-01

    The counter rotating type hydroelectric unit, which is composed of the axial flow type tandem runners and the peculiar generator with double rotational armatures,was proposed to utilize effectively the tidal power. In the unit, the front and the rear runners counter drive the inner and the outer armatures of the generator, respectively. Besides, the flow direction at the rear runner outlet must coincide with the flow direction at the front runner inlet, because the angular momentum through the rear runner must coincides with that through the front runner. That is, the flow runs in the axial direction at the rear runner outlet while the axial inflow at the front runner inlet. Such operations are suitable for working at the seashore with rising and falling tidal flows, and the unit may be able to take place of the traditional bulb type turbines. The tandem runners were operated at the on-cam conditions, in keeping the induced frequency constant. The output and the hydraulic efficiency are affected by the adjustment of the front and the blade setting angles. The both optimum angles giving the maximum output and/or efficiency were presented at the various discharges/heads. To promote more the tidal power generation by this type unit, the runners were also modified so as to be suitable for both rising and falling flows. The hydraulic performances are acceptable while the output is determined mainly by the trailing edge profiles of the runner blades.

  20. Development of a Low Cost 10kW Tubular SOFC Power System

    Energy Technology Data Exchange (ETDEWEB)

    Bessette, Norman [Acumentrics Corporation, Westwood, MA (United States); Litka, Anthony [Acumentrics Corporation, Westwood, MA (United States); Rawson, Jolyon [Acumentrics Corporation, Westwood, MA (United States); Schmidt, Douglas [Acumentrics Corporation, Westwood, MA (United States)

    2013-06-06

    The DOE program funded from 2003 through early 2013 has brought the Acumentrics SOFC program from an early stage R&D program to an entry level commercial product offering. The development work started as one of the main core teams under the DOE Solid State Energy Conversion Alliance (SECA) program administered by the National Energy Technology Laboratory (NETL) of the DOE. During the first phase of the program, lasting approximately 3-4 years, a 5kW machine was designed, manufactured and tested against the specification developed by NETL. This unit was also shipped to NETL for independent verification testing which validated all of the results achieved while in the laboratory at Acumentrics. The Acumentrics unit passed all criteria established from operational stability, efficiency, and cost projections. Passing of the SECA Phase I test allowed the program to move into Phase II of the program. During this phase, the overall objective was to further refine the unit meeting a higher level of performance stability as well as further cost reductions. During the first year of this new phase, the NETL SECA program was refocused towards larger size units and operation on coal gasification due to the severe rise in natural gas prices and refocus on the US supply of indigenous coal. At this point, the program was shifted to the U.S. DOE’s Energy Efficiency and Renewable Energy (EERE) division located in Golden, Colorado. With this shift, the focus remained on smaller power units operational on gaseous fuels for a variety of applications including micro combined heat and power (mCHP). To achieve this goal, further enhancements in power, life expectancy and reductions in cost were necessary. The past 5 years have achieved these goals with machines that can now achieve over 40% electrical efficiency and field units that have now operated for close to a year and a half with minimal maintenance. The following report details not only the first phase while under the SECA program

  1. Manual of phosphoric acid fuel cell power plant cost model and computer program

    Science.gov (United States)

    Lu, C. Y.; Alkasab, K. A.

    1984-01-01

    Cost analysis of phosphoric acid fuel cell power plant includes two parts: a method for estimation of system capital costs, and an economic analysis which determines the levelized annual cost of operating the system used in the capital cost estimation. A FORTRAN computer has been developed for this cost analysis.

  2. Unit for wind power plants and water power. Aggregat fuer Windkraftanlagen und Wasserkraft

    Energy Technology Data Exchange (ETDEWEB)

    Armonies, H.; Armonies, G.

    1983-01-13

    The invention concerns the manufacture and process of kinetic thermal units for wind power plants and water power. It is characterized by the fact that the supporting frame of the unit is made so that it carries the unit shaft bearing and also a fixed flange for a hollow body, pump part, unit shaft pushback device and thermal insulation. The unit shaft running in bearings is made so that it can rotate in the two bearings or a double bearing and can also slide between 2 flanges on the unit shaft in the longitudinal direction of the bearings. The end of the unit shaft projecting beyond the supporting frame is made so that the wind blades, rotors or water turbines can be connected to it by flanges. The rotor shaft can be pressed against a hollow body carrying a liquid by a friction disc. A heat resistant liquid pump is also situated on the supporting frame. It is driven by the unit shaft. (HWJ).

  3. Brayton Power Conversion Unit Tested: Provides a Path to Future High-Power Electric Propulsion Missions

    Science.gov (United States)

    Mason, Lee S.

    2003-01-01

    Closed-Brayton-cycle conversion technology has been identified as an excellent candidate for nuclear electric propulsion (NEP) power conversion systems. Advantages include high efficiency, long life, and high power density for power levels from about 10 kWe to 1 MWe, and beyond. An additional benefit for Brayton is the potential for the alternator to deliver very high voltage as required by the electric thrusters, minimizing the mass and power losses associated with the power management and distribution (PMAD). To accelerate Brayton technology development for NEP, the NASA Glenn Research Center is developing a low-power NEP power systems testbed that utilizes an existing 2- kWe Brayton power conversion unit (PCU) from previous solar dynamic technology efforts. The PCU includes a turboalternator, a recuperator, and a gas cooler connected by gas ducts. The rotating assembly is supported by gas foil bearings and consists of a turbine, a compressor, a thrust rotor, and an alternator on a single shaft. The alternator produces alternating-current power that is rectified to 120-V direct-current power by the PMAD unit. The NEP power systems testbed will be utilized to conduct future investigations of operational control methods, high-voltage PMAD, electric thruster interactions, and advanced heat rejection techniques. The PCU was tested in Glenn s Vacuum Facility 6. The Brayton PCU was modified from its original solar dynamic configuration by the removal of the heat receiver and retrofitting of the electrical resistance gas heater to simulate the thermal input of a steady-state nuclear source. Then, the Brayton PCU was installed in the 3-m test port of Vacuum Facility 6, as shown. A series of tests were performed between June and August of 2002 that resulted in a total PCU operational time of about 24 hr. An initial test sequence on June 17 determined that the reconfigured unit was fully operational. Ensuing tests provided the operational data needed to characterize PCU

  4. The cost of pressure ulcers in the United Kingdom.

    Science.gov (United States)

    Dealey, C; Posnett, J; Walker, A

    2012-06-01

    To provide an estimate of the costs of treating pressure ulcers in the UK at August 2011 prices, as a means of highlighting the importance of pressure ulcer prevention. Resource use was derived from a bottom-up methodology, based on the daily resources required to deliver protocols of care reflecting good clinical practice, with prices reflecting costs to the health and social care system in the UK. This approach was used to estimate treatment costs per episode of care and per patient for ulcers of different severity and level of complications. The cost of treating a pressure ulcer varies from £1,214 (category 1) to £14,108 (category IV). Costs increase with ulcer severity because the time to heal is longer and the incidence of complications is higher in more severe cases. Pressure ulcers represent a significant cost burden in the UK, both to patients and to health-care providers. Without concerted effort, this cost is likely to increase in the future as the population ages. The estimates reported here provide a basis for assessment of the cost-effectiveness of measures to reduce the incidence of hospital-acquired ulcers. Heron Evidence Development Ltd. was funded for this work by Mölnlycke Health Care (UK). The authors have no other conflicts of interest to declare.

  5. Effect of heliostat size on the levelized cost of electricity for power towers

    Science.gov (United States)

    Pidaparthi, Arvind; Hoffmann, Jaap

    2017-06-01

    The objective of this study is to investigate the effects of heliostat size on the levelized cost of electricity (LCOE) for power tower plants. These effects are analyzed in a power tower with a net capacity of 100 MWe, 8 hours of thermal energy storage and a solar multiple of 1.8 in Upington, South Africa. A large, medium and a small size heliostat with a total area of 115.56 m2, 43.3 m2 and 15.67 m2 respectively are considered for comparison. A radial-staggered pattern and an external cylindrical receiver are considered for the heliostat field layouts. The optical performance of the optimized heliostat field layouts has been evaluated by the Hermite (analytical) method using SolarPILOT, a tool used for the generation and optimization of the heliostat field layout. The heliostat cost per unit is calculated separately for the three different heliostat sizes and the effects due to size scaling, learning curve benefits and the price index is included. The annual operation and maintenance (O&M) costs are estimated separately for the three heliostat fields, where the number of personnel required in the field is determined by the number of heliostats in the field. The LCOE values are used as a figure of merit to compare the different heliostat sizes. The results, which include the economic and the optical performance along with the annual O&M costs, indicate that lowest LCOE values are achieved by the medium size heliostat with an area of 43.3 m2 for this configuration. This study will help power tower developers determine the optimal heliostat size for power tower plants currently in the development stage.

  6. Outlooks for Wind Power in the United States: Drivers and Trends under a 2016 Policy Environment

    Energy Technology Data Exchange (ETDEWEB)

    Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Lantz, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ho, Jonathan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Stehly, Tyler [National Renewable Energy Lab. (NREL), Golden, CO (United States); Heimiller, Donna [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-12-01

    Over the past decade, wind power has become one of the fastest growing electricity generation sources in the United States. Despite this growth, the U.S. wind industry continues to experience year-to-year fluctuations across the manufacturing and supply chain as a result of dynamic market conditions and changing policy landscapes. Moreover, with advancing wind technologies, ever-changing fossil fuel prices, and evolving energy policies, the long-term future for wind power is highly uncertain. In this report, we present multiple outlooks for wind power in the United States, to explore the possibilities of future wind deployment. The future wind power outlooks presented rely on high-resolution wind resource data and advanced electric sector modeling capabilities to evaluate an array of potential scenarios of the U.S. electricity system. Scenario analysis is used to explore drivers, trends, and implications for wind power deployment over multiple periods through 2050. Specifically, we model 16 scenarios of wind deployment in the contiguous United States. These scenarios span a wide range of wind technology costs, natural gas prices, and future transmission expansion. We identify conditions with more consistent wind deployment after the production tax credit expires as well as drivers for more robust wind growth in the long run. Conversely, we highlight challenges to future wind deployment. We find that the degree to which wind technology costs decline can play an important role in future wind deployment, electric sector CO2 emissions, and lowering allowance prices for the Clean Power Plan.

  7. Major issues associated with nuclear power generation cost and their evaluation

    International Nuclear Information System (INIS)

    Matsuo, Yuji; Shimogori, Kei; Suzuki, Atsuhiko

    2015-01-01

    This paper discusses the evaluation of power generation cost that is an important item for energy policy planning. Especially with a focus on nuclear power generation cost, it reviews what will become a focal point on evaluating power generation cost at the present point after the estimates of the 'Investigation Committee on Costs' that was organized by the government have been issued, and what will be a major factor affecting future changes in costs. This paper firstly compared several estimation results on nuclear power generation cost, and extracted/arranged controversial points and unsolved points for discussing nuclear power generation cost. In evaluating nuclear power generation cost, the comparison of capital cost and other costs can give the understanding of what can be important issues. Then, as the main issues, this paper evaluated/discussed the construction cost, operation/maintenance cost, external cost, issue of discount rate, as well as power generation costs in foreign countries and the impact of fossil fuel prices. As other issues related to power generation cost evaluation, it took up expenses for decommissioning, disposal of high-level radioactive waste, and re-processing, outlined the evaluation results by the 'Investigation Committee on Costs,' and compared them with the evaluation examples in foreign countries. These costs do not account for a large share of the entire nuclear power generation costs. The most important point for considering future energy policy is the issue of discount rate, that is, the issue of fund-raising environment for entrepreneurs. This is the factor to greatly affect the economy of future nuclear power generation. (A.O.)

  8. High level waste transport and disposal cost calculations for the United Kingdom

    International Nuclear Information System (INIS)

    Nattress, P.C.; Ward, R.D.

    1992-01-01

    Commercial nuclear power has been generated in the United Kingdom since 1962, and throughout that time fuel has been reprocessed giving rise to high level waste. This has been managed by storing fission products and related wastes as highly active liquor, and more recently by a program of vitrification and storage of the glass blocks produced. Government policy is that vitrified high level waste should be stored for at least 50 years, which has the technical advantage of allowing the heat output rate of the waste to fall, making disposal easier and cheaper. Thus, there is no immediate requirement to develop a deep geological repository in the UK, but the nuclear companies do have a requirement to make financial provision out of current revenues for high level waste disposal at a future repository. In 1991 the interested organizations undertook a new calculation of costs for such provisions, which is described here. The preliminary work for the calculation included the assumption of host geology characteristics, a compatible repository concept including overpacking, and a range of possible nuclear programs. These have differing numbers of power plants, and differing mixes of high level waste from reprocessing and spent fuel for direct disposal. An algorithm was then developed so that the cost of high level waste disposal could be calculated for any required case within a stated envelope of parameters. An Example Case was then considered in detail leading to the conclusion that a repository to meet the needs of a constant UK nuclear economy up to the middle of the next century would have a cash cost of UK Pounds 1194M (US$2011M). By simple division the cost to a kWh of electricity is UK Pounds 0.00027 (0.45 US mil). (author)

  9. A simple approach to calculate active power of electrosurgical units

    Directory of Open Access Journals (Sweden)

    André Luiz Regis Monteiro

    Full Text Available Abstract Introduction: Despite of more than a hundred years of electrosurgery, only a few electrosurgical equipment manufacturers have developed methods to regulate the active power delivered to the patient, usually around an arbitrary setpoint. In fact, no manufacturer has a method to measure the active power actually delivered to the load. Measuring the delivered power and computing it fast enough so as to avoid injury to the organic tissue is challenging. If voltage and current signals can be sampled in time and discretized in the frequency domain, a simple and very fast multiplication process can be used to determine the active power. Methods This paper presents an approach for measuring active power at the output power stage of electrosurgical units with mathematical shortcuts based on a simple multiplication procedure of discretized variables – frequency domain vectors – obtained through Discrete Fourier Transform (DFT applied on time-sampled voltage and current vectors. Results Comparative results between simulations and a practical experiment are presented – all being in accordance with the requirements of the applicable industry standards. Conclusion An analysis is presented comparing the active power analytically obtained through well-known voltage and current signals against a computational methodology based on vector manipulation using DFT only for time-to-frequency domain transformation. The greatest advantage of this method is to determine the active power of noisy and phased out signals with neither complex DFT or ordinary transform methodologies nor sophisticated computing techniques such as convolution. All results presented errors substantially lower than the thresholds defined by the applicable standards.

  10. Power unit impedance and distance protection functions during faults in the external power grid

    Directory of Open Access Journals (Sweden)

    Marcin Lizer

    2012-12-01

    Full Text Available This paper presents the problem of the risk of an unnecessary tripping of a generation unit’s underimpedance protection functions in circumstances of generator power swings following elimination of long-lasting fault in the external power grid. The fi rst part describes typical solutions of a generator impedance protection function (21e and unit distance protection function (21s. Starting characteristics of these protection functions are shown, as well as their typical operating logics and ways of calculating their settings. Then exemplary (the most common solutions of unit under-impedance relays power swing blocking functions are described. Following this introduction, the issues of the threat of unnecessary operation of fast-tripping protection zones of 21e and 21s protection functions are described, which arises in the circumstances of generator asynchronous power swings occurring after elimination of long-lasting faults in the grid supplied by the power unit. The paper also shows that the available power swing blocking functions may not be able to correctly detect the described conditions, thus allowing the unnecessary operation of under-impedance relays. How an impedance calculation algorithm affects the impedance trajectory seen by a protection relay is also resented.

  11. Case study of the effects of public safety regulation on the construction costs of coal-fired and nuclear power plants

    International Nuclear Information System (INIS)

    Morris, C.D.

    1987-01-01

    Regulations intended to reduce the number of accidents at nuclear plants and the discharge of sulfur and particulate wastes at coal-fired power plants have become an important cause of construction cost escalation. Measuring the costs of these regulatory interventions is a difficult research task. The three-unit Bruce Mansfield coal-fired plant and the two-unit Beaver Valley nuclear power station located in Shippingport, Pennsylvania, provide a unique opportunity for a case study of the costs of regulation in the construction of both kinds of plants. The units of each plant were built sequentially over a period of intensifying regulation. The method used to measure the costs of public safety regulation in the construction of each kind of plant is to determine the connections between the issuances of the regulatory agencies (EPA and NRC) and cost escalations of succeeding units. The small cost escalations of the Mansfield 3 unit, in comparison to the massive costs of the Beaver Valley 2 unit, suggest that the design and construction of new coal-fired plants are not disrupted by regulatory interventions nearly as extensively as are nuclear units. Certain technical features of Beaver Valley 2, especially its small size and a design that is identical to the first unit's, further contribute to its cost escalations

  12. Rise and fall of nuclear power in the United States and the limits of regulation

    International Nuclear Information System (INIS)

    Del Sesto, S.L.

    1982-01-01

    This paper documents the rapid growth of nuclear power in the United States and its subsequent decline in the late 1970s. It demonstrates that the increase in numbers of new orders for nuclear plants created pressures for additional licensing complexity to insure safety and provide public intervenors with opportunities to participate in the regulatory process. The resulting protraction of the licensing process combined with increasing political opposition to nuclear power caused construction delays and bureaucratic bottlenecks at a time when soaring interest rates and double-digit inflation have pushed the cost of building new facilities out of the reach of the financially battered utility industry. Together with a downturn in demand for electricity and increasing uncertainty over nuclear power, no reactor orders have been placed since late 1978. It is argued that renewed growth of nuclear power in the United States is unlikely, especially in a regulatory environment which fosters increased costs of electricity to consumers and a simultaneous abrogation of the economies of scale. The consequences of the impending atrophication of the nuclear industry in America and its effects on future energy mixes and long-term national interests must be considered in future nuclear policies and reforms

  13. 76 FR 13168 - Energy Conservation Program for Consumer Products: Representative Average Unit Costs of Energy

    Science.gov (United States)

    2011-03-10

    ... average unit costs of residential energy in a Federal Register notice entitled, ``Energy Conservation... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Energy Conservation Program for Consumer Products: Representative Average Unit Costs of Energy AGENCY: Office of Energy Efficiency...

  14. 78 FR 17648 - Energy Conservation Program for Consumer Products: Representative Average Unit Costs of Energy

    Science.gov (United States)

    2013-03-22

    ... Conservation Program for Consumer Products: Representative Average Unit Costs of Energy'', dated April 26, 2012... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Energy Conservation Program for Consumer Products: Representative Average Unit Costs of Energy AGENCY: Office of Energy Efficiency...

  15. Consideration concerning the costs of the 300 kW wind units developed in Romania

    Energy Technology Data Exchange (ETDEWEB)

    Gyulai, F; Bej, A [Technical Univ. of Timisoara (Romania). Wind Energy Research Center

    1996-12-31

    A demonstrative wind farm with four research units, 300 kW each, is in developing stage in Romania. The article shows economic analysis of these experimental wind units and their cost structure focusing in component costs, performance, manufacturing technology and installing work. (author)

  16. Consideration concerning the costs of the 300 kW wind units developed in Romania

    International Nuclear Information System (INIS)

    Gyulai, F.; Bej, A.

    1995-01-01

    A demonstrative wind farm with four research units, 300 kW each, is in developing stage in Romania. The article shows economic analysis of these experimental wind units and their cost structure focusing in component costs, performance, manufacturing technology and installing work. (author)

  17. Consideration concerning the costs of the 300 kW wind units developed in Romania

    Energy Technology Data Exchange (ETDEWEB)

    Gyulai, F.; Bej, A. [Technical Univ. of Timisoara (Romania). Wind Energy Research Center

    1995-12-31

    A demonstrative wind farm with four research units, 300 kW each, is in developing stage in Romania. The article shows economic analysis of these experimental wind units and their cost structure focusing in component costs, performance, manufacturing technology and installing work. (author)

  18. Trends in Japan's power generation costs after the Fukushima Daiichi Nuclear Power Plant accident and their influence on finance of electric utilities

    International Nuclear Information System (INIS)

    Matsuo, Yuhji; Yamaguchi, Yuhji; Murakami, Tomoko

    2013-01-01

    Following the Fukushima Daiichi nuclear power plant accident, the nuclear reactors that were suspended for periodic inspections after the Fukushima accident were not permitted to resume operation, and nuclear power generation in Japan continued to decline. In this article, the authors quantitatively evaluated the effects on power generation costs of Japan's situation, using electric utilities financial reports up to FY 2011. We also analyzed the profitability of the Japanese electric industry, using the financial statements included in the reports, and quantitatively evaluated the effects of changes in power generation costs. The total cost of power generation has increased from 7.5 trillion yen in FY 2010 before the Fukushima accident to 9.6 trillion yen in FY 2011 and to 10.6 trillion yen in FY 2012. In particular, the fuel cost for thermal power generation rose sharply from 3.7 trillion yen in FY 2010 to 6.1 trillion yen in FY 2011 and 7.3 trillion yen in FY 2012, almost doubling in the two years from FY 2010 to 2012. The unit cost of power generation rose sharply from 8.6 yen/kWh in FY 2010 to 11.8 yen/kWh in FY 2011 and 13.5 yen/kWh in FY 2012. The unit cost is expected to rise even further in FY 2013 due to the weak yen. As the result not only Tokyo Electric Power Company, but also the other general electric utilities registered huge net losses. Their retained earnings (total of eight utilities) dropped by 2 trillion yen between FY 2010 and 2012. With increased thermal power generation, the risk of rising costs associated with changes in primary energy prices and exchange rates has increased drastically. For the stability of the electricity industry and the development of the Japanese economy, the government should clearly formulate a basic policy regarding the composition of power sources, and an effective plan both at home and abroad, and should develop a system that will be also to handle sudden changes in the composition of power sources. (author)

  19. COSTS AND PROFITABILITY IN FOOD PROCESSING: PASTRY TYPE UNITS

    Directory of Open Access Journals (Sweden)

    DUMITRANA MIHAELA

    2013-08-01

    Full Text Available For each company, profitability, products quality and customer satisfaction are the most importanttargets. To attaint these targets, managers need to know all about costs that are used in decision making. Whatkind of costs? How these costs are calculated for a specific sector such as food processing? These are only a fewquestions with answers in our paper. We consider that a case study for this sector may be relevant for all peoplethat are interested to increase the profitability of this specific activity sector.

  20. Control and automation technology in United States nuclear power plants

    International Nuclear Information System (INIS)

    Sun, B.K.H.

    1997-01-01

    The need to use computers for nuclear power plant design, engineering, operation and maintenance has been growing since the inception of commercial nuclear power electricity generation in the 1960s. The needs have intensified in recent years as the demands of safety and reliability, as well as economic competition, have become stronger. The rapid advance of computer hardware and software technology in the last two decades has greatly enlarged the potential of computer applications to plant instrumentation and control of future plants, as well as those needed for operation of existing plants. The traditional role of computers for mathematical calculations and data manipulation has been expanded to automate plant control functions and to enhance human performance and productivity. The major goals of using computers for instrumentation and control of nuclear power plants are (1) to improve safety; (2) to reduce challenges to the power plant; (3) to reduce the cost of operations and maintenance; (4) to enhance power production, and (5) to increase productivity of people. Many functions in nuclear power plants are achieved by a combination of human action and automation. Increasingly, computer-based systems are used to support operations and maintenance personnel in the performance of their tasks. There are many benefits which can accrue from the use of computers but it is important to ensure that the design and implementation of the support system and the human task places the human in the correct role in relation to the machine; that is, in a management position, with the computer serving the human. In addition, consideration must be given to computer system integrity, software validation and verification, consequences of error, etc., to ensure its reliability for nuclear power plant applications. (author). 31 refs

  1. Control and automation technology in United States nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Sun, B K.H. [Sunutech, Inc., Los Altos, CA (United States)

    1997-07-01

    The need to use computers for nuclear power plant design, engineering, operation and maintenance has been growing since the inception of commercial nuclear power electricity generation in the 1960s. The needs have intensified in recent years as the demands of safety and reliability, as well as economic competition, have become stronger. The rapid advance of computer hardware and software technology in the last two decades has greatly enlarged the potential of computer applications to plant instrumentation and control of future plants, as well as those needed for operation of existing plants. The traditional role of computers for mathematical calculations and data manipulation has been expanded to automate plant control functions and to enhance human performance and productivity. The major goals of using computers for instrumentation and control of nuclear power plants are (1) to improve safety; (2) to reduce challenges to the power plant; (3) to reduce the cost of operations and maintenance; (4) to enhance power production, and (5) to increase productivity of people. Many functions in nuclear power plants are achieved by a combination of human action and automation. Increasingly, computer-based systems are used to support operations and maintenance personnel in the performance of their tasks. There are many benefits which can accrue from the use of computers but it is important to ensure that the design and implementation of the support system and the human task places the human in the correct role in relation to the machine; that is, in a management position, with the computer serving the human. In addition, consideration must be given to computer system integrity, software validation and verification, consequences of error, etc., to ensure its reliability for nuclear power plant applications. (author). 31 refs.

  2. Securing the United States' power infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Happenny, Sean F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-08-01

    The United States’ power infrastructure is aging, underfunded, and vulnerable to cyber attack. Emerging smart grid technologies may take some of the burden off of existing systems and make the grid as a whole more efficient, reliable, and secure. The Pacific Northwest National Laboratory (PNNL) is funding research into several aspects of smart grid technology and grid security, creating a software simulation tool that will allow researchers to test power distribution networks utilizing different smart grid technologies to determine how the grid and these technologies react under different circumstances. Demonstrating security in embedded systems is another research area PNNL is tackling. Many of the systems controlling the U.S. critical infrastructure, such as the power grid, lack integrated security and the networks protecting them are becoming easier to breach. Providing a virtual power substation network to each student team at the National Collegiate Cyber Defense Competition, thereby supporting the education of future cyber security professionals, is another way PNNL is helping to strengthen the security of the nation’s power infrastructure.

  3. Costs for Hospital Stays in the United States, 2011

    Science.gov (United States)

    ... Lauren M. Wier, M.P.H., and Claudia Steiner, M.D., M.P.H. Introduction Health care ... Truven Health Analytics), Wier, LM (Truven Health Analytics), Steiner, C (AHRQ). Costs for Hospital Stays in the ...

  4. Cost Analysis of an Air Brayton Receiver for a Solar Thermal Electric Power System in Selected Annual Production Volumes

    Science.gov (United States)

    1981-01-01

    Pioneer Engineering and Manufacturing Company estimated the cost of manufacturing and Air Brayton Receiver for a Solar Thermal Electric Power System as designed by the AiResearch Division of the Garrett Corporation. Production costs were estimated at annual volumes of 100; 1,000; 5,000; 10,000; 50,000; 100,000 and 1,000,000 units. These costs included direct labor, direct material and manufacturing burden. A make or buy analysis was made of each part of each volume. At high volumes special fabrication concepts were used to reduce operation cycle times. All costs were estimated at an assumed 100% plant capacity. Economic feasibility determined the level of production at which special concepts were to be introduced. Estimated costs were based on the economics of the last half of 1980. Tooling and capital equipment costs were estimated for ach volume. Infrastructure and personnel requirements were also estimated.

  5. Cost Analysis of Leed Certified United States Navy Buildings

    Science.gov (United States)

    2011-08-03

    be accumulated in order to offset initial investment costs - St = Savings in operational costs in year t associated with a given alternative - ∆I0...ior Non-Structural Elements er.o• 2 1 Construction Waste ManagenMnt Oivort 50% fro m Disposal Crocllt 22 Construction Waste Managemen t , Divert 75... Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302. Respondents should be aware that notwithstanding

  6. Fission Surface Power Technology Demonstration Unit Test Results

    Science.gov (United States)

    Briggs, Maxwell H.; Gibson, Marc A.; Geng, Steven M.; Sanzi, James L.

    2016-01-01

    The Fission Surface Power (FSP) Technology Demonstration Unit (TDU) is a system-level demonstration of fission power technology intended for use on manned missions to Mars. The Baseline FSP systems consists of a 190 kWt UO2 fast-spectrum reactor cooled by a primary pumped liquid metal loop. This liquid metal loop transfers heat to two intermediate liquid metal loops designed to isolate fission products in the primary loop from the balance of plant. The intermediate liquid metal loops transfer heat to four Stirling Power Conversion Units (PCU), each of which produce 12 kWe (48 kW total) and reject waste heat to two pumped water loops, which transfer the waste heat to titanium-water heat pipe radiators. The FSP TDU simulates a single leg of the baseline FSP system using an electrically heater core simulator, a single liquid metal loop, a single PCU, and a pumped water loop which rejects the waste heat to a Facility Cooling System (FCS). When operated at the nominal operating conditions (modified for low liquid metal flow) during TDU testing the PCU produced 8.9 kW of power at an efficiency of 21.7 percent resulting in a net system power of 8.1 kW and a system level efficiency of 17.2 percent. The reduction in PCU power from levels seen during electrically heated testing is the result of insufficient heat transfer from the NaK heater head to the Stirling acceptor, which could not be tested at Sunpower prior to delivery to the NASA Glenn Research Center (GRC). The maximum PCU power of 10.4 kW was achieved at the maximum liquid metal temperature of 875 K, minimum water temperature of 350 K, 1.1 kg/s liquid metal flow, 0.39 kg/s water flow, and 15.0 mm amplitude at an efficiency of 23.3 percent. This resulted in a system net power of 9.7 kW and a system efficiency of 18.7 percent.

  7. Cost-Benefit Analysis of Flexibility Retrofits for Coal and Gas-Fueled Power Plants: August 2012 - December 2013

    Energy Technology Data Exchange (ETDEWEB)

    Venkataraman, S. [GE Energy, Schenectady, NY (United States); Jordan, G. [GE Energy, Schenectady, NY (United States); O' Connor, M. [GE Energy, Schenectady, NY (United States); Kumar, N. [Intertek AIM, Sunnyvale, CA (United States); Lefton, S. [Intertek AIM, Sunnyvale, CA (United States); Lew, D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brinkman, G. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Palchak, D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cochran, J. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-12-01

    High penetrations of wind and solar power plants can induce on/off cycling and ramping of fossil-fueled generators. This can lead to wear-and-tear costs and changes in emissions for fossil-fueled generators. Phase 2 of the Western Wind and Solar Integration Study (WWSIS-2) determined these costs and emissions and simulated grid operations to investigate the full impact of wind and solar on the fossil-fueled fleet. This report studies the costs and benefits of retrofitting existing units for improved operational flexibility (i.e., capability to turndown lower, start and stop faster, and ramp faster between load set-points).

  8. Silicon-Carbide Power MOSFET Performance in High Efficiency Boost Power Processing Unit for Extreme Environments

    Science.gov (United States)

    Ikpe, Stanley A.; Lauenstein, Jean-Marie; Carr, Gregory A.; Hunter, Don; Ludwig, Lawrence L.; Wood, William; Del Castillo, Linda Y.; Fitzpatrick, Fred; Chen, Yuan

    2016-01-01

    Silicon-Carbide device technology has generated much interest in recent years. With superior thermal performance, power ratings and potential switching frequencies over its Silicon counterpart, Silicon-Carbide offers a greater possibility for high powered switching applications in extreme environment. In particular, Silicon-Carbide Metal-Oxide- Semiconductor Field-Effect Transistors' (MOSFETs) maturing process technology has produced a plethora of commercially available power dense, low on-state resistance devices capable of switching at high frequencies. A novel hard-switched power processing unit (PPU) is implemented utilizing Silicon-Carbide power devices. Accelerated life data is captured and assessed in conjunction with a damage accumulation model of gate oxide and drain-source junction lifetime to evaluate potential system performance at high temperature environments.

  9. Concrete works in Igata Nuclear Power Station Unit-2

    International Nuclear Information System (INIS)

    Yanase, Hidemasa

    1981-01-01

    The construction of Igata Nuclear Power Station Unit-2 was started in February, 1978, and is scheduled to start the commercial operation in March, 1982. Construction works are to be finished by August, 1981. The buildings of Igata Nuclear Power Station are composed of large cross section concrete for the purpose of shielding and the resistance to earth quakes. In response to this, moderate heat Portland cement has been employed, and in particular, the heat of hydration has been controlled. In this report, also fine and coarse aggregates, admixtures and chemical admixtures, and further, the techniques to improve the quality are described. Concrete preparation plant was installed in the power station site. Fresh concrete was carried with agitator body trucks from the preparation plant to the unloading point, and from there with pump trucks. Placing of concrete was carried out, striving to obtain homogeneous and dense concrete by using rod type vibrators. Further, concrete was placed in low slump (8 - 15 cm) to reduce water per unit volume, and its temperature was also carefully controlled, e.g., cold water (temperature of mixing water was about 10 deg C) was used in summer season (end of June to end of September). As a result, the control target was almost satisfied. As for testing and inspection, visual appearance test was done as well as material testing in compliance with JIS and other standards. (Wakatsuki, Y.)

  10. AMERICAN ELECTRIC POWER'S CONESVILLE POWER PLANT UNIT NO.5 CO2 CAPTURE RETROFIT STUDY

    Energy Technology Data Exchange (ETDEWEB)

    Carl R. Bozzuto; Nsakala ya Nsakala; Gregory N. Liljedahl; Mark Palkes; John L. Marion

    2001-06-30

    ALSTOM Power Inc.'s Power Plant Laboratories (ALSTOM) has teamed with American Electric Power (AEP), ABB Lummus Global Inc. (ABB), the US Department of Energy National Energy Technology Laboratory (DOE NETL), and the Ohio Coal Development Office (OCDO) to conduct a comprehensive study evaluating the technical feasibility and economics of alternate CO{sub 2} capture and sequestration technologies applied to an existing US coal-fired electric generation power plant. The motivation for this study was to provide input to potential US electric utility actions concerning GHG emissions reduction. If the US decides to reduce CO{sub 2} emissions, action would need to be taken to address existing power plants. Although fuel switching from coal to natural gas may be one scenario, it will not necessarily be a sufficient measure and some form of CO{sub 2} capture for use or disposal may also be required. The output of this CO{sub 2} capture study will enhance the public's understanding of control options and influence decisions and actions by government, regulators, and power plant owners in considering the costs of reducing greenhouse gas CO{sub 2} emissions. The total work breakdown structure is encompassed within three major reports, namely: (1) Literature Survey, (2) AEP's Conesville Unit No.5 Retrofit Study, and (3) Bench-Scale Testing and CFD Evaluation. The report on the literature survey results was issued earlier by Bozzuto, et al. (2000). Reports entitled ''AEP's Conesville Unit No.5 Retrofit Study'' and ''Bench-Scale Testing and CFD Evaluation'' are provided as companion volumes, denoted Volumes I and II, respectively, of the final report. The work performed, results obtained, and conclusions and recommendations derived therefrom are summarized.

  11. The cost of integration of parabolic trough CSP plants in isolated Mediterranean power systems

    International Nuclear Information System (INIS)

    Poullikkas, Andreas; Hadjipaschalis, Ioannis; Kourtis, George

    2010-01-01

    In this work, a technical and economic analysis concerning the integration of parabolic trough concentrated solar power (CSP) technologies, with or without thermal storage capability, in an existing typical small isolated Mediterranean power generation system, in the absence of a feed-in tariff scheme, is carried out. In addition to the business as usual (BAU) scenario, five more scenarios are examined in the analysis in order to assess the electricity unit cost with the penetration of parabolic trough CSP plants of 50 MWe or 100 MWe, with or without thermal storage capability. Based on the input data and assumptions made, the simulations indicated that the scenario with the utilization of a single parabolic trough CSP plant (either 50 MWe or 100 MWe and with or without thermal storage capability) in combination with BAU will effect an insignificant change in the electricity unit cost of the generation system compared to the BAU scenario. In addition, a sensitivity analysis on natural gas price, showed that increasing fuel prices and the existence of thermal storage capability in the CSP plant make this scenario marginally more economically attractive compared to the BAU scenario. (author)

  12. Nuclear economics 2000: Deterministic and probabilistic projections of nuclear and coal electric power generation costs for the year 2000

    International Nuclear Information System (INIS)

    Williams, K.A.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1987-06-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base-load nuclear and coal-fired power plants with a startup date of January 2000. For the Midwest region a complete data set that specifies each parameter used to obtain the comparative results is supplied. When based on the reference set of input variables, the comparison of power generation costs is found to favor nuclear in most regions of the country. Nuclear power is most favored in the northeast and western regions where coal must be transported over long distances; however, coal-fired generation is most competitive in the north central region where large reserves of cheaply mineable coal exist. In several regions small changes in the reference variables could cause either option to be preferred. The reference data set reflects the better of recent electric utility construction cost experience (BE) for nuclear plants. This study assumes as its reference case a stable regulatory environment and improved planning and construction practices, resulting in nuclear plants typically built at the present BE costs. Today's BE nuclear-plant capital investment cost model is then being used as a surrogate for projected costs for the next generation of light-water reactor plants. An alternative analysis based on today's median experience (ME) nuclear-plant construction cost experience is also included. In this case, coal is favored in all ten regions, implying that typical nuclear capital investment costs must improve for nuclear to be competitive

  13. DENINT power plant cost benefit analysis code: Analysis of methane fuelled power plant/district heating system

    International Nuclear Information System (INIS)

    Cincotti, V.; D'Andrea, A.

    1989-07-01

    The DENINT power plant cost benefit analysis code takes into consideration, not only power production costs at the generator terminals, but also, in the case of cogeneration, the costs of the fuel supply and heat and power distribution systems which depend greatly on the location of the plant. The code is able to allow comparisons of alternatives with varying annual operation hours, fuel cost increases, and different types of fossil fuels and production systems. For illustrative purposes, this paper examines two methane fired cogeneration plant/district heating alternatives

  14. Can hybrid solar-fossil power plants mitigate CO2 at lower cost than PV or CSP?

    Science.gov (United States)

    Moore, Jared; Apt, Jay

    2013-03-19

    Fifteen of the United States and several nations require a portion of their electricity come from solar energy. We perform an engineering-economic analysis of hybridizing concentrating solar thermal power with fossil fuel in an Integrated Solar Combined Cycle (ISCC) generator. We construct a thermodynamic model of an ISCC plant in order to examine how much solar and fossil electricity is produced and how such a power plant would operate, given hourly solar resource data and hourly electricity prices. We find that the solar portion of an ISCC power plant has a lower levelized cost of electricity than stand-alone solar power plants given strong solar resource in the US southwest and market conditions that allow the capacity factor of the solar portion of the power plant to be above 21%. From a local government perspective, current federal subsidies distort the levelized cost of electricity such that photovoltaic electricity is slightly less expensive than the solar electricity produced by the ISCC. However, if the cost of variability and additional transmission lines needed for stand-alone solar power plants are taken into account, the solar portion of an ISCC power plant may be more cost-effective.

  15. Cryptococcal Meningitis Treatment Strategies Affected by the Explosive Cost of Flucytosine in the United States: A Cost-effectiveness Analysis.

    Science.gov (United States)

    Merry, Matthew; Boulware, David R

    2016-06-15

    In the United States, cryptococcal meningitis causes approximately 3400 hospitalizations and approximately 330 deaths annually. The US guidelines recommend treatment with amphotericin B plus flucytosine for at least 2 weeks, followed by fluconazole for a minimum of 8 weeks. Due to generic drug manufacturer monopolization, flucytosine currently costs approximately $2000 per day in the United States, with a 2-week flucytosine treatment course costing approximately $28 000. The daily flucytosine treatment cost in the United Kingdom is approximately $22. Cost-effectiveness analysis was performed to determine the value of flucytosine relative to alternative regimens. We estimated the incremental cost-effectiveness ratio (ICER) of 3 cryptococcal induction regimens: (1) amphotericin B deoxycholate for 4 weeks; (2) amphotericin and flucytosine (100 mg/kg/day) for 2 weeks; and (3) amphotericin and fluconazole (800 mg/day) for 2 weeks. Costs of care were calculated using 2015 US prices and the medication costs. Survival estimates were derived from a randomized trial and scaled relative to published US survival data. Cost estimates were $83 227 for amphotericin monotherapy, $75 121 for amphotericin plus flucytosine, and $44 605 for amphotericin plus fluconazole. The ICER of amphotericin plus flucytosine was $23 842 per quality-adjusted life-year. Flucytosine is currently cost-effective in the United States despite a dramatic increase in price in recent years. Combination therapy with amphotericin and flucytosine is the most attractive treatment strategy for cryptococcal meningitis, though the rising price may be creating access issues that will exacerbate if the trend of profiteering continues. © The Author 2016. Published by Oxford University Press for the Infectious Diseases Society of America. All rights reserved. For permissions, e-mail journals.permissions@oup.com.

  16. Cost Indexing and Unit Price Adjustments for Construction Materials

    Science.gov (United States)

    2012-10-30

    This project was focused on the assimilation of information regarding unit price adjustment clauses, or PACs, : that are offered for construction materials at the state Departments of Transportation (DOTs). It is intended to : provide the South Carol...

  17. Cost unit accounting based on a clinical pathway: a practical tool for DRG implementation.

    Science.gov (United States)

    Feyrer, R; Rösch, J; Weyand, M; Kunzmann, U

    2005-10-01

    Setting up a reliable cost unit accounting system in a hospital is a fundamental necessity for economic survival, given the current general conditions in the healthcare system. Definition of a suitable cost unit is a crucial factor for success. We present here the development and use of a clinical pathway as a cost unit as an alternative to the DRG. Elective coronary artery bypass grafting was selected as an example. Development of the clinical pathway was conducted according to a modular concept that mirrored all the treatment processes across various levels and modules. Using service records and analyses the process algorithms of the clinical pathway were developed and visualized with CorelTM iGrafix Process 2003. A detailed process cost record constituted the basis of the pathway costing, in which financial evaluation of the treatment processes was performed. The result of this study was a structured clinical pathway for coronary artery bypass grafting together with a cost calculation in the form of cost unit accounting. The use of a clinical pathway as a cost unit offers considerable advantages compared to the DRG or clinical case. The variance in the diagnoses and procedures within a pathway is minimal, so the consumption of resources is homogeneous. This leads to a considerable improvement in the value of cost unit accounting as a strategic control instrument in hospitals.

  18. Low-Cost Radiator for Fission Power Thermal Control

    Science.gov (United States)

    Maxwell, Taylor; Tarau, Calin; Anderson, William; Hartenstine, John; Stern, Theodore; Walmsley, Nicholas; Briggs, Maxwell

    2014-01-01

    NASA Glenn Research Center (GRC) is developing fission power system technology for future Lunar surface power applications. The systems are envisioned in the 10 to 100kW(sub e) range and have an anticipated design life of 8 to 15 years with no maintenance. NASA GRC is currently setting up a 55 kW(sub e) non-nuclear system ground test in thermal-vacuum to validate technologies required to transfer reactor heat, convert the heat into electricity, reject waste heat, process the electrical output, and demonstrate overall system performance. Reducing the radiator mass, size, and cost is essential to the success of the program. To meet these goals, Advanced Cooling Technologies, Inc. (ACT) and Vanguard Space Technologies, Inc. (VST) are developing a single facesheet radiator with heat pipes directly bonded to the facesheet. The facesheet material is a graphite fiber reinforced composite (GFRC) and the heat pipes are titanium/water. By directly bonding a single facesheet to the heat pipes, several heavy and expensive components can be eliminated from the traditional radiator design such as, POC(TradeMark) foam saddles, aluminum honeycomb, and a second facesheet. A two-heat pipe radiator prototype, based on the single facesheet direct-bond concept, was fabricated and tested to verify the ability of the direct-bond joint to withstand coefficient of thermal expansion (CTE) induced stresses during thermal cycling. The thermal gradients along the bonds were measured before and after thermal cycle tests to determine if the performance degraded. Overall, the results indicated that the initial uniformity of the adhesive was poor along one of the heat pipes. However, both direct bond joints showed no measureable amount of degradation after being thermally cycled at both moderate and aggressive conditions.

  19. Control and automation technology in United States nuclear power plants

    International Nuclear Information System (INIS)

    Sun, B.K.H.

    1995-01-01

    The need to use computers for nuclear power plant design, engineering, operation and maintenance has been growing since the inception of commercial nuclear power electricity generation in the 1960s. The needs have intensified in recent years as the demands of safety and reliability, as well as economic competition, have become stronger. The rapid advanced of computer hardware and software technology in the last two decades has greatly enlarged the potential of computer applications to plant instrumentation and control of future plants, as well as those needed for operation of existing plants. The traditional role of computers for mathematical calculations and data manipulation has been expanded to automate plant control functions and to enhance human performance and productivity. The major goals of using computers for instrumentation and control of nuclear power plants are: (1) to improve safety; (2) to reduce challenges to capital investments; (3) to reduce the cost of operations and maintenance; (4) to enhance power production; and (5) to increase productivity of people. Many functions in nuclear power plants are achieved by a combination of human action and automation. Increasingly, computer-based systems are used to support operations and maintenance personnel in the performance of their tasks. There are many benefits which can accrue from the use of computers but it is important to ensure that the design and implementation of the support system, and the human task places the human in the correct role in the relation to the machine; that is, in a management position, with the computer serving the human. In addition, consideration must be given to computer system integrity, software validation and verification, consequences of error, etc., to ensure its reliability for nuclear power plant applications. (author). 31 refs

  20. Draft Environmental Statement related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1984-12-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with Beaver Valley Power Station Unit 2 pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs

  1. DESIGNING FEATURES OF POWER OPTICAL UNITS FOR TECHNOLOGICAL EQUIPMENT

    Directory of Open Access Journals (Sweden)

    M. Y. Afanasiev

    2016-03-01

    Full Text Available This paper considers the question of an optical unit designing for transmitting power laser radiation through an optical fiber. The aim of this work is designing a simple construction unit with minimized reflection losses. The source of radiation in the optical unit described below is an ultraviolet laser with diode pumping. We present the general functioning scheme and designing features for the three main parts: laser beam deflecting system, laser beam dump and optical unit control system. The described laser beam deflection system is composed of a moving flat mirror and a spherical scattering mirror. Comparative analysis of the production technology for such mirrors was carried out, and, as a result, the decision was made to produce both mirrors of 99.99 % pure molybdenum without coating. A moving mirror deflects laser emission from a source through a fiber or deflects it on a spherical mirror and into the laser beam dump, moreover, switching from one position to another occurs almost immediately. It is shown that a scattering mirror is necessary, otherwise, the absorbing surface of the beam dump is being worn out irregularly. The laser beam dump is an open conical cavity, in which the conical element with its spire turned to the emission source is placed. Special microgeometry of the internal surface of the beam dump is suggested for the better absorption effect. An optical unit control system consists of a laser beam deflection system, laser temperature sensor, deflection system solenoid temperature sensor, and deflection mirror position sensor. The signal processing algorithm for signals coming from the sensors to the controller is described. The optical unit will be used in special technological equipment.

  2. Life-cycle cost assessment of seismically base-isolated structures in nuclear power plants

    International Nuclear Information System (INIS)

    Wang, Hao; Weng, Dagen; Lu, Xilin; Lu, Liang

    2013-01-01

    Highlights: • The life-cycle cost of seismic base-isolated nuclear power plants is modeled. • The change law of life-cycle cost with seismic fortification intensity is studied. • The initial cost of laminated lead rubber bearings can be expressed as the function of volume. • The initial cost of a damper can be expressed as the function of its maximum displacement and tonnage. • The use of base-isolation can greatly reduce the expected damage cost, which leads to the reduction of the life-cycle cost. -- Abstract: Evaluation of seismically base-isolated structural life-cycle cost is the key problem in performance based seismic design. A method is being introduced to address the life-cycle cost of base-isolated reinforced concrete structures in nuclear power plants. Each composition of life-cycle cost is analyzed including the initial construction cost, the isolators cost and the excepted damage cost over life-cycle of the structure. The concept of seismic intensity is being used to estimate the expected damage cost, greatly simplifying the calculation. Moreover, French Cruas nuclear power plant is employed as an example to assess its life-cycle cost, compared to the cost of non-isolated plant at the same time. The results show that the proposed method is efficient and the expected damage cost is enormously reduced because of the application of isolators, which leads to the reduction of the life-cycle cost of nuclear power plants

  3. Cleaning device for steam units in a nuclear power plant

    International Nuclear Information System (INIS)

    Sasamuro, Takemi.

    1978-01-01

    Purpose: To prevent radioactive contamination upon dismantling and inspection of steam units such as a turbine to a building containing such units and the peripheral area. Constitution: A steam generator indirectly heated by steam supplied from steam generating source in a separate system containing no radioactivity is provided to produce cleaning steam. A cleaning steam pipe is connected by way of a stop valve between separation valve of a nuclear power plant steam pipe and a high pressure turbine. Upon cleaning, the separation valve is closed, and steam supplied from the cleaning steam pipe is flown into a condenser. The water thus condensated is returned by way of a feed water heater and a condenser to a water storage tank. (Nakamura, S.)

  4. Feasibility and Costs of Natural Gas as a Bridge to Deep Decarbonization in the United States

    Science.gov (United States)

    Jones, A. D.; McJeon, H. C.; Muratori, M.; Shi, W.

    2015-12-01

    Achieving emissions reductions consistent with a 2 degree Celsius global warming target requires nearly complete replacement of traditional fossil fuel combustion with near-zero carbon energy technologies in the United States by 2050. There are multiple technological change pathways consistent with this deep decarbonization, including strategies that rely on renewable energy, nuclear, and carbon capture and storage (CCS) technologies. The replacement of coal-fired power plants with natural gas-fired power plants has also been suggested as a bridge strategy to achieve near-term emissions reduction targets. These gas plants, however, would need to be replaced by near-zero energy technologies or retrofitted with CCS by 2050 in order to achieve longer-term targets. Here we examine the costs and feasibility of a natural gas bridge strategy. Using the Global Change Assessment (GCAM) model, we develop multiple scenarios that each meet the recent US Intended Nationally Determined Contribution (INDC) to reduce GHG emissions by 26%-28% below its 2005 levels in 2025, as well as a deep decarbonization target of 80% emissions reductions below 1990 levels by 2050. We find that the gas bridge strategy requires that gas plants be retired on average 20 years earlier than their designed lifetime of 45 years, a potentially challenging outcome to achieve from a policy perspective. Using a more idealized model, we examine the net energy system costs of this gas bridge strategy compared to one in which near-zero energy technologies are deployed in the near tem. We explore the sensitivity of these cost results to four factors: the discount rate applied to future costs, the length (or start year) of the gas bridge, the relative capital cost of natural gas vs. near-zero energy technology, and the fuel price of natural gas. The discount rate and cost factors are found to be more important than the length of the bridge. However, we find an important interaction as well. At low discount rates

  5. [Cost of intensive care in a German hospital: cost-unit accounting based on the InEK matrix].

    Science.gov (United States)

    Martin, J; Neurohr, C; Bauer, M; Weiss, M; Schleppers, A

    2008-05-01

    The aim of this study was to determine the actual cost per intensive care unit (ICU) day in Germany based on routine data from an electronic patient data management system as well as analysis of cost-driving factors. A differentiation between days with and without mechanical ventilation was performed. On the ICU of a German focused-care hospital (896 beds, 12 anesthesiology ICU beds), cost per treatment day was calculated with or without mechanical ventilation from the perspective of the hospital. Costs were derived retrospectively with respect to the period between January and October 2006 by cost-unit accounting based on routine data collected from the ICU patients. Patients with a length of stay of at least 2 days on the ICU were included. Demographic, clinical and economical data were analyzed for patient characterization. Data of 407 patients (217 male and 190 female) were included in the analysis, of which 159 patients (100 male, 59 female) were completely or partially mechanically ventilated. The mean simplified acute physiology (SAPS) II score at the onset of ICU stay was 28.2. Average cost per ICU day was 1,265 EUR and costs for ICU days with and without mechanical ventilation amounted to 1,426 EUR and 1,145 EUR, respectively. Personnel costs (50%) showed the largest cost share followed by drugs plus medicinal products (18%) and infrastructure (16%). For the first time, a cost analysis of intensive care in Germany was performed with routine data based on the matrix of the institute for reimbursement in hospitals (InEK). The results revealed a higher resource use on the ICU than previously expected. The large share of personnel costs on the ICU was evident but is comparable to other medical departments in the hospital. The need for mechanical ventilation increases the daily costs of resources by approximately 25%.

  6. Transportation cost of nuclear off-peak power for hydrogen production based on water electrolysis

    International Nuclear Information System (INIS)

    Shimizu, Saburo; Ueno, Shuichi

    2004-01-01

    The paper describes transportation cost of the nuclear off-peak power for a hydrogen production based on water electrolysis in Japan. The power could be obtainable by substituting hydropower and/or fossil fueled power supplying peak and middle demands with nuclear power. The transportation cost of the off-peak power was evaluated to be 1.42 yen/kWh when an electrolyser receives the off-peak power from a 6kV distribution wire. Marked reduction of the cost was caused by the increase of the capacity factor. (author)

  7. The costs of wind power. Socio-economic costs of expansion of wind power; Vindkraftens pris. Samfundsoekonomiske omkostninger ved udbygning af vindkraft

    Energy Technology Data Exchange (ETDEWEB)

    Busk, R.; Larsen, Anderse; Skovsgaard Nielsen, L.; Nielsen, Uffe; Pade, L.L.; Mulvad Jeppesen, L. [Inst. for Miljoevurdering (Denmark); Munksgaard, J. [Amternes of Kommunernes Forskningsinst. (Denmark)

    2007-08-28

    This report was prepared in order to inform the basis for making energy policy decisions, particularly in with respect to Denmark's goals for renewable energy and wind power. The report estimates the socio-economic costs of expanding Danish wind power to a share of 30, 40 and 50%, respectively, of the electricity consumption by 2025. The report also analyses barriers to and instruments for the expansion of Danish wind power. The main analysis is a socio-economic cost analysis which includes, among other factors, costs of investments, infrastructure and tax distortion losses. (au)

  8. Performance/Power Space Exploration for Binary64 Division Units

    DEFF Research Database (Denmark)

    Nannarelli, Alberto

    2016-01-01

    The digit-recurrence division algorithm is used in several high-performance processors because it provides good tradeoffs in terms of latency, area and power dissipation. In this work we develop a minimally redundant radix-8 divider for binary64 (double-precision) aiming at obtaining better energy...... efficiency in the performance-per-watt space. The results show that the radix-8 divider, when compared to radix-4 and radix-16 units, requires less energy to complete a division for high clock rates....

  9. Nuclear power plant life extension in the United Kingdom

    International Nuclear Information System (INIS)

    Goodison, D.; Seddon, J.W.; Pape, E.M.

    1991-01-01

    The safety cases for the United Kingdom's older nuclear power plant have been reviewed by their utilities in order to justify continued operation of the reactors up to an age of at least 30 year. These 'long term safety reviews' have identified worthwhile plant modifications and aspects where further studies or plant inspections are required. As the plants approach the age of 30 years, 'life extension reviews' are now being undertaken, concentrating on management of ageing, to support operation to at least 40 years. (author)

  10. Multi-Functional Distributed Generation Unit for Power Quality Enhancement

    DEFF Research Database (Denmark)

    Zeng, Zheng; Yang, Huan; Guerrero, Josep M.

    2015-01-01

    A multi-functional distributed generation unit (MFDGU) and its control strategy are proposed in this paper for the purpose of enhancing power quality in low-voltage networks. By using the 3H-bridge converter structure, an MFDGU can be applied in 3-phase 4-wire low-voltage distribution networks...... reference of the MFDGU, which can be easily implemented in three-phase networks. A 15kVA prototype consisting of three full bridge converters has been built and tested. Experimental results show the feasibility of the proposed topology and control strategy....

  11. Poultry litter power station in the United Kingdom

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Poultry litter has presented a waste disposal problem to the poultry industry in many parts of the United Kingdom. The plant at Eye is a small to medium scale power station, fired using poultry litter. The 12.7 MW of electricity generated is supplied, through the local utility, to the National Grid. The spent litter that constitutes the fuel is made up of excrement and animal bedding (usually 90% excrement and 10% straw or wood shavings). It comes from large climate-controlled buildings (broiler houses) where birds, reared for meat production, are allowed to roam freely. (UK)

  12. Final Environmental Statement related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1985-09-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with Beaver Valley Power Station Unit 2 pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs, and concludes that the action called for is the issuance of an operating license for Beaver Valley Unit 2

  13. Brayton rotating units for space reactor power systems

    Energy Technology Data Exchange (ETDEWEB)

    Gallo, Bruno M.; El-Genk, Mohamed S. [Institute for Space and Nuclear Power Studies and Chemical and Nuclear Engineering Dept., The Univ. of New Mexico, Albuquerque, NM 87131 (United States)

    2009-09-15

    Designs and analyses models of centrifugal-flow compressor and radial-inflow turbine of 40.8kW{sub e} Brayton Rotating Units (BRUs) are developed for 15 and 40 g/mole He-Xe working fluids. Also presented are the performance results of a space power system with segmented, gas cooled fission reactor heat source and three Closed Brayton Cycle loops, each with a separate BRU. The calculated performance parameters of the BRUs and the reactor power system are for shaft rotational speed of 30-55 krpm, reactor thermal power of 120-471kW{sub th}, and turbine inlet temperature of 900-1149 K. With 40 g/mole He-Xe, a power system peak thermal efficiency of 26% is achieved at rotation speed of 45 krpm, compressor and turbine inlet temperatures of 400 and 1149 K and 0.93 MPa at exit of the compressor. The corresponding system electric power is 122.4kW{sub e}, working fluid flow rate is 1.85 kg/s and the pressure ratio and polytropic efficiency are 1.5% and 86.3% for the compressor and 1.42% and 94.1% for the turbine. For the same nominal electrical power of 122.4kW{sub e}, decreasing the molecular weight of the working fluid (15 g/mole) decreases its flow rate to 1.03 kg/s and increases the system pressure to 1.2 MPa. (author)

  14. Development of a method to evaluate shared alternate AC power source effects in multi-unit nuclear power plants

    International Nuclear Information System (INIS)

    Jung, Woo Sik; Yang, Joon Eun

    2003-07-01

    In order to evaluate accurately a Station BlackOut (SBO) event frequency of a multi-unit nuclear power plant that has a shared Alternate AC (AAC) power source, an approach has been developed which accommodates the complex inter-unit behavior of the shared AAC power source under multi-unit Loss Of Offsite Power (LOOP) conditions. The approach is illustrated for two cases, 2 units and 4 units at a single site, and generalized for a multi-unit site. Furthermore, the SBO frequency of the first unit of the 2-unit site is quantified. The SBO frequency at a target unit of Probabilistic Safety Assessment (PSA) could be underestimated if the inter-unit dependency of the shared AAC power source is not properly modeled. The effect of the inter-unit behavior of the shared AAC power source on the SBO frequency is not negligible depending on the Common Cause Failure (CCF) characteristics among AC power sources. The methodology suggested in the present report is believed to be very useful in evaluating the SBO frequency and the core damage frequency resulting from the SBO event. This approach is also applicable to the probabilistic evaluation of the other shared systems in a multi-unit nuclear power plant

  15. Small gas-turbine units for the power industry: Ways for improving the efficiency and the scale of implementation

    Science.gov (United States)

    Kosoi, A. S.; Popel', O. S.; Beschastnykh, V. N.; Zeigarnik, Yu. A.; Sinkevich, M. V.

    2017-10-01

    Small power units (market are reviewed. The most promising lines for the development of the new generation of small GTUs are examined. Special emphasis is placed on the three lines selected for improving the efficiency of small GTUs: increasing the fuel efficiency, cutting down the maintenance cost, and integration with local or renewable power sources. It is demonstrated that, as to the specific fuel consumption, small GTUs of the new generation can have an efficiency 20-25% higher than those of the previous generation, require no maintenance between overhauls, and can be capable of efficient integration into intelligent electrical networks with power facilities operating on renewable or local power sources.

  16. Fuel flexibility in power generation onboard offshore floating units

    Energy Technology Data Exchange (ETDEWEB)

    Keep, Jeroen van [Waertsilae Corporation, Helsinki (Finland)

    2012-07-01

    Power Plants for offshore oil and gas installations utilizing dual fuel (DF) reciprocating engines are by many owners seen as an interesting alternative to conventional solutions due to the apparent advantages in fuel flexibility, fuel efficiency and lower emission. The paper summarizes the dual fuel technology, typical solutions for FPSO's and operational. Items that are discussed: DF operation and how it works; fuel flexibility, including transfer between fuel modes; fuel efficiency, also in production an important cost saver; emissions of the different fuel modes; size and weights, constraints; experiences of the P-63 project. With the above it is safe to conclude that the DF-technology is mature with important benefits for the offshore production market in certain specific applications, most notably the FPSO's for fields in low gas to oil ratios, bringing important fuel cost savings and also for new-built F-LNG/FSO/FPSO's where the power plant can be accommodated below decks, freeing up valuable deck space for the process plant. (author)

  17. Supercritical Carbon Dioxide Power Generation System Definition: Concept Definition and Capital Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Stoddard, Larry [Black & Veatch, Kansas City, MO (United States); Galluzzo, Geoff [Black & Veatch, Kansas City, MO (United States); Andrew, Daniel [Black & Veatch, Kansas City, MO (United States); Adams, Shannon [Black & Veatch, Kansas City, MO (United States)

    2016-06-30

    The Department of Energy’s (DOE’s) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO has a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and 30 percent further reductions by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO2 (sCO2) cycles. DOE retained Black & Veatch to support SETO’s SunShot Initiative for CSP solar power tower technology in the following areas: 1. Concept definition, including costs and schedule, of a flexible test facility to be used to test and prove components in part to support financing. 2. Concept definition, including costs and schedule, of an integrated high temperature molten salt (MS) facility with thermal energy storage and with a supercritical CO2 cycle generating approximately 10MWe. 3. Concept definition, including costs and schedule, of an integrated high temperature falling particle facility with thermal energy storage and with a supercritical CO2 cycle

  18. Intensive care unit drug costs in the context of total hospital drug expenditures with suggestions for targeted cost containment efforts.

    Science.gov (United States)

    Altawalbeh, Shoroq M; Saul, Melissa I; Seybert, Amy L; Thorpe, Joshua M; Kane-Gill, Sandra L

    2018-04-01

    To assess costs of intensive care unit (ICU) related pharmacotherapy relative to hospital drug expenditures, and to identify potential targets for cost-effectiveness investigations. We offer the unique advantage of comparing ICU drug costs with previously published data a decade earlier to describe changes over time. Financial transactions for all ICU patients during fiscal years (FY) 2009-2012 were retrieved from the hospital's data repository. ICU drug costs were evaluated for each FY. ICU departments' charges were also retrieved and calculated as percentages of total ICU charges. Albumin, prismasate (dialysate), voriconazole, factor VII and alteplase denoted the highest percentages of ICU drug costs. ICU drug costs contributed to an average of 31% (SD 1.0%) of the hospital's total drug costs. ICU drug costs per patient day increased by 5.8% yearly versus 7.8% yearly for non-ICU drugs. This rate was higher for ICU drugs costs at 12% a decade previous. Pharmacy charges contributed to 17.7% of the total ICU charges. Growth rates of costs per year have declined but still drug expenditures in the ICU are consistently a significant driver in this resource intensive environment with a high impact on hospital drug expenditures. Copyright © 2017 Elsevier Inc. All rights reserved.

  19. Distribution Grid Integration Unit Cost Database | Solar Research | NREL

    Science.gov (United States)

    consulting companies, IEEE Some data is provided to give a sense of the order of magnitude of the lifetime , as O&M and component lifetime data is sparse, the effects of PV on device O&M and lifetimes Inverter manufacturers, PV developers The cost of advanced inverters depends on whether the capability of

  20. Nuclear and coal-fired power plant capital costs 1978 -June 1981

    International Nuclear Information System (INIS)

    Harbour, R.T.

    1981-07-01

    This bibliography covers 16 papers dealing with the economics of power generation - mainly comparisons between the capital costs of nuclear and coal fired plants. Some of the papers additionally discuss fuel, operating and maintenance costs, and performance. (U.K.)