WorldWideScience

Sample records for unit planning workbook

  1. Being Prepared for Climate Change: A Workbook for Developing Risk-Based Adaptation Plans

    Science.gov (United States)

    This workbook is a guide for environmental professionals to construct a climate change adaptation plan based on identifying risks and their consequences. It incorporates watershed management, vulnerability assessments and action planning.

  2. Nuclear power reactor security personnel training and qualification plan reviewer workbook

    International Nuclear Information System (INIS)

    1979-06-01

    The Training and Qualification Plan Reviewer Workbook has been developed to provide the information required for evaluating the adequacy of the Training and Qualification (T and Q) Plans developed to meet the requirements of 10 CFR 73.55(b)(4) and 10 CFR 73, Appendix B

  3. EKG Student Workbook.

    Science.gov (United States)

    Webb, Sandra M.

    This student workbook is designed to assist advanced medical-surgical nursing students in understanding and making electrocardiographic (EKG) interpretations. Addressed in the seven units of the workbook are the following topics: EKG indicators, EKG ruled paper divisions, the normal cardiac cycle and pathophysiology, abnormal cardiac waves, atrial…

  4. Your Business Plan: A Workbook for Small Businesses in Oregon = Su Plan de Negocio: Un Libro de Trabajo Para Empresas Pequenas en Oregon.

    Science.gov (United States)

    Sargent, Dennis J.; Chambers, Maynard N.

    Designed as an aid for those investigating the possibility of opening their first business, as well as business owners with many years experience who have never prepared a written business plan, this workbook guides the reader through the steps involved in the preparation of a business plan or feasibility study. After a general discussion of the…

  5. Concrete. Course in Carpentry. Workbook and Tests.

    Science.gov (United States)

    California State Dept. of Education, Sacramento. Bureau of Publications.

    This workbook is one of a series of individually bound units of instruction for carpentry apprenticeship classes in a four-year apprenticeship program. It consists of two sections--the workbook section and a test section. The workbook section provides instructional materials on 10 topics: introduction to cement and concrete, specifications for…

  6. La Comunicacion (Communication). Latino Family Life Education Curriculum Series. Curriculum Unit [and] Student Workbook.

    Science.gov (United States)

    Chavez, Gene T.

    This 10-lesson curriculum unit provides teachers with some basic tools to help Latino students improve their communication skills. Primary goals are to help students analyze how a person's belief system affects the communication process, and to develop and improve decision-making and communication skills. The following key components are included…

  7. Roofing: Workbook and Tests. First-Aid Training.

    Science.gov (United States)

    California State Dept. of Education, Sacramento. Bureau of Publications.

    This workbook on first aid is one of a series of nine individual units of instruction for roofing apprenticeship classes in California. The workbook covers 12 topics: introduction to first-aid practices; burns; skeletal injuries; spinal injuries; wounds, bleeding, and bruises; emergencies of the heart and blood circulation system; breathing and…

  8. Guidelines and workbook for assessment of organization and administration of utilities seeking operating license for Nuclear Power Plant. Workbook for assessment of organization and management. Volume 2

    International Nuclear Information System (INIS)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1985-08-01

    Purpose of the Workbook is to guide the NRC reviewer through a systematic review and assessment of a proposed organization and administration. The Workbook outlines criteria for evaluating a written organization/administration plan and ensures consistent and comprehensive review of organization plans and site visit materials. The Workbook is designed to assist the NRC reviewer in assembling and analyzing objective information deemed necessary for judging acceptability of the plan, but it does not itself make the judgment

  9. Science Unit Plans. PACE '94.

    Science.gov (United States)

    Schoon, Kenneth J., Ed.; Wiles, Clyde A., Ed.

    This booklet contains mathematics unit plans for Biology, Chemistry, and Physical Science developed by PACE (Promoting Academic Excellence In Mathematics, Science & Technology for Workers of the 21st Century). Each unit plan contains suggested timing, objectives, skills to be acquired, workplace relationships, learning activities with suggested…

  10. Fermilab Research Program Workbook

    International Nuclear Information System (INIS)

    Rubinstein, R.

    1984-05-01

    The Fermilab Research Program Workbook has been published annually for the past several years to assist the Physics Advisory Committee in the yearly program review conducted during its summer meeting. While this is still a major aim, it is hoped that the Workbook will also prove useful to others seeking information on the current status of Fermilab experiments and the properties of beams at the Laboratory. In addition, short summaries of approved experiments are also included

  11. CERCLA site assessment workbook, Volume 1

    International Nuclear Information System (INIS)

    1994-08-01

    This workbook provides instructions for planning, implementing, and reporting site assessments under CERCLA, commonly referred to as Superfund. Site assessment consists of two information-gathering steps: the remedial preliminary assessment (PA) and the site inspection (SI). The information obtained is then used to estimate, or score, a site's relative risk to public health and the environment. The score is derived via the hazard ranking system (HRS). Although the workbook and its exercises can be adapted to group study, it is designed primarily for use by an individual

  12. Snakes: An Integrated Unit Plan.

    Science.gov (United States)

    Lawrence, Lisa

    This document presents an integrated unit plan on snakes targeting second grade students. Objectives of the unit include developing concepts of living things, understanding the contribution and importance of snakes to the environment, and making connections between different disciplines. The unit integrates the topic of snakes into the areas of…

  13. Geothermal Small Business Workbook [Geothermal Outreach and Project Financing

    Energy Technology Data Exchange (ETDEWEB)

    Elizabeth Battocletti

    2003-05-01

    Small businesses are the cornerstone of the American economy. Over 22 million small businesses account for approximately 99% of employers, employ about half of the private sector workforce, and are responsible for about two-thirds of net new jobs. Many small businesses fared better than the Fortune 500 in 2001. Non-farm proprietors income rose 2.4% in 2001 while corporate profits declined 7.2%. Yet not all is rosy for small businesses, particularly new ones. One-third close within two years of opening. From 1989 to 1992, almost half closed within four years; only 39.5% were still open after six years. Why do some new businesses thrive and some fail? What helps a new business succeed? Industry knowledge, business and financial planning, and good management. Small geothermal businesses are no different. Low- and medium-temperature geothermal resources exist throughout the western United States, the majority not yet tapped. A recent survey of ten western states identified more than 9,000 thermal wells and springs, over 900 low- to moderate-temperature geothermal resource areas, and hundreds of direct-use sites. Many opportunities exist for geothermal entrepreneurs to develop many of these sites into thriving small businesses. The ''Geothermal Small Business Workbook'' (''Workbook'') was written to give geothermal entrepreneurs, small businesses, and developers the tools they need to understand geothermal applications--both direct use and small-scale power generation--and to write a business and financing plan. The Workbook will: Provide background, market, and regulatory data for direct use and small-scale (< 1 megawatt) power generation geothermal projects; Refer you to several sources of useful information including owners of existing geothermal businesses, trade associations, and other organizations; Break down the complicated and sometimes tedious process of writing a business plan into five easy steps; Lead you

  14. Management of planned unit outages

    International Nuclear Information System (INIS)

    Brune, W.

    1984-01-01

    Management of planned unit outages at the Bruno Leuschner Nuclear Power Plant is based on the experience gained with Soviet PWR units of the WWER type over a period of more than 50 reactor-years. For PWR units, planned outages concentrate almost exclusively on annual refuellings and major maintenance of the power plant facilities involved. Planning of such major maintenance work is based on a standardized basic network plan and a catalogue of standardized maintenance and inspection measures. From these, an overall maintenance schedule of the unit and partial process plans of the individual main components are derived (manually or by computer) and, in the temporal integration of major maintenance at every unit, fixed starting times and durations are determined. More than 75% of the maintenance work at the Bruno Leuschner Nuclear Power Plant is carried out by the plant's own maintenance personnel. Large-scale maintenance of every unit is controlled by a special project head. He is assisted by commissioners, each of whom is responsible for his own respective item. A daily control report is made. The organizational centre is a central office which works in shifts around the clock. All maintenance orders and reports of completion pass through this office; thus, the overall maintenance schedule can be corrected daily. To enforce the proposed operational strategy, suitable accompanying technical measures are required with respect to effective facility monitoring and technical diagnosis, purposeful improvement of particularly sensitive components and an increase in the effectiveness of maintenance work by special technologies and devices. (author)

  15. Learning Perl Student Workbook

    CERN Document Server

    foy, brian

    2012-01-01

    This is an ebook-only workbook to accompany the 6th Edition of Learning Perl ("the Llama"). If you're just getting started with Perl, this is the book you want-whether you're a programmer, system administrator, or web hacker. This 6th edition of Learning Perl covers recent changes to the language up to version 5.14. Exercises are presented in the first half of the workbook, with the answers in the second. Topics include: Scalar DataLists and ArraysSubroutinesInput and OutputHashesIn the World of Regular ExpressionsMatching with Regular ExpressionsProcessing Text with Regular Expressions10.

  16. Basic Cake Decorating Workbook.

    Science.gov (United States)

    Bogdany, Mel

    Included in this student workbook for basic cake decorating are the following: (1) Drawings of steps in a basic way to ice a layer cake, how to make a paper cone, various sizes of flower nails, various sizes and types of tin pastry tubes, and special rose tubes; (2) recipes for basic decorating icings (buttercream, rose paste, and royal icing);…

  17. Business partners a lower intermediate business English course : workbook

    CERN Document Server

    Brown, Pearson

    1993-01-01

    This is the workbook in a stimulating course which integrates presentation of language with exercises and activities. There are 15 ten-age unies, each incorporating wide grammar coverage, systematic vocabulary presentation, listening and reading skills, and pair-work role plays. The workbook is a self-study practice book with 15 varied units of supplementary material for class use, homework and private study.

  18. Guidelines and workbook for assessment of organization and administration of utilities seeking operating license for a nuclear power plant. Guidelines for utility organization and administration plan. Volume 1, Revision 1

    International Nuclear Information System (INIS)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1986-09-01

    Volumes 1 and 2 of this report are a partial response to the requirements of Item I.B.1.1 of the ''NRC Action Plan Developed as a Result of the TMI-2 Accident,'' NUREG-0660, and are designed to serve as a basis for replacing the earlier NUREG-0731, ''Guidelines for Utility Management Structure and Technical Resources.'' These Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The purpose of the Workbook (Vol. 2) is to guide the NRC reviewer through a systematic review and assessment of a proposed organization and administration. It is the NRC's intention to incorporate these Guidelines and Workbook into a future revision of the Standard Review Plan (SRP), NUREG-0800. However, at this time the report is being published so that the material may be used on a voluntary basis by industry to systematically prepare or evaluate their organization or administration plans. Use of the report by the NRC would not occur until after it has been incorpoarted in the SRP

  19. AutoCAD workbook

    CERN Document Server

    Metherell, Phil

    1989-01-01

    AutoCAD Workbook helps new users learn the basics of AutoCad, providing guidance on most of the commonly used functions in which the program operates.This book discusses loading AutoCad and starting a drawing; drawing and erasing lines, circles, and arcs; and setting up the drawing environment. The topics on drawing and editing polylines; entering text and text styles; and layers, linetype, and color are also considered. This publication likewise covers creating and using blocks, hatching and extracting information, dimensioning drawings, 3D visualization, and plotting a drawing. Other

  20. Moosehorn National Wildlife Refuge Workbook Summary

    Science.gov (United States)

    Montag, Jessica M.; Stinchfield, Holly M.

    2009-01-01

    The Moosehorn National Wildlife Refuge in eastern Maine is currently developing a comprehensive conservation plan (CCP) that will guide Refuge management over the next 15 years. Workbooks were provided to local residents as part of the scoping process in order to get feedback on current and future management issues from the public. The workbooks asked questions regarding residents' use of the Refuge, conservation problems and issues in the region, the acceptability of Refuge management actions, and the importance of, satisfaction with, and acceptability of various activities allowed on the Refuge. The focus of this report is to present the results of the completed workbooks. Because of the small number of returned workbooks, it is not possible to generalize these findings to the broader public, nor is it possible to determine if respondents represent the average user. However, the results do provide an idea of possible conflicts and important issues that the Refuge may have to address in the future. The permitted uses of the Refuge are one possible conflict area. Many respondents were supportive of consumptive recreation (hunting, fishing, and trapping), but a few were adamantly opposed to these sorts of activities on the Refuge. Another issue that received several comments was motorized recreation. While some people felt strongly that ATVs and snowmobiles should be allowed, others felt just as strongly that motorized recreation of any type should not be allowed in the Refuge. Many in the sample were also very concerned about Refuge development and its effects on the human and natural environments. Issues mentioned include the loss of access to private land for consumptive recreation, concern about fish and wildlife habitat degradation, and water quality.

  1. Fermilab research program workbook

    International Nuclear Information System (INIS)

    Rubinstein, R.

    1983-05-01

    The Fermilab Research Program Workbook has been produced annually for the past several years, with the original motivation of assisting the Physics Advisory Committee in its yearly program review conducted during its summer meeting. While this is still the primary goal, the Workbook is increasingly used by others needing information on the current status of Fermilab experiments, properties of beams, and short summaries of approved experiments. At the present time, considerable changes are taking place in the facilities at Fermilab. We have come to the end of the physics program using the 400 GeV Main Ring, which is now relegated to be just an injector for the soon-to-be commissioned Tevatron. In addition, the experimental areas are in the midst of a several-year program of upgrading to 1000 GeV capability. Several new beam lines will be built in the next few years; some indications can be given of their properties, although with the caveat that designs for some are by no means final. Already there is considerable activity leading to experiments studying anti p p collisions at √s = 2000 GeV

  2. Asphalt and Wood Shingling. Roofing Workbook and Tests.

    Science.gov (United States)

    Brown, Arthur

    This combination workbook and set of tests contains materials on asphalt and wood shingling that have been designed to be used by those studying to enter the roofing and waterproofing trade. It consists of seven instructional units and seven accompanying objective tests. Covered in the individual units are the following topics: shingling…

  3. Workbook on data analysis

    Energy Technology Data Exchange (ETDEWEB)

    Hopke, P K [Department of Chemistry, Clarkson Univ., Potsdam, NY (United States)

    2000-07-01

    As a consequence of various IAEA programmes to sample airborne particulate matter and determine its elemental composition, the participating research groups are accumulating data on the composition of the atmospheric aerosol. It is necessary to consider ways in which these data can be utilized in order to be certain that the data obtained are correct and that the information then being transmitted to others who may make decisions based on such information is as representative and correct as possible. In order to both examine the validity of those data and extract appropriate information from them, it is necessary to utilize a variety of data analysis methods. The objective of this workbook is to provide a guide with examples of utilizing data analysis on airborne particle composition data using a spreadsheet program (EXCEL) and a personal computer based statistical package (StatGraphics)

  4. Solar Design Workbook

    Energy Technology Data Exchange (ETDEWEB)

    Franta, G.; Baylin, F.; Crowther, R.; Dubin, F.; Grace, A., Griffith, J.W.; Holtz, M.; Kutscher, C.; Nordham, D.; Selkowitz, S.; Villecco, M.

    1981-06-01

    This Solar Design Workbook presents solar building design applications for commercial buildir^s. The book is divided into four sections. The first section describes the variety of solar applications in buildings including conservation aspects, solar fundamentals, passive systems, active systems, daylighting, and other solar options. Solar system design evaluation techniques including considerations for building energy requirements, passive systems, active systems, and economics are presented in Section II. The third section attempts to assist the designer in the building design process for energy conservation and solar applications including options and considerations for pre-design, design, and post-design phases. The information required for the solar design proee^ has not been fully developed at this time. Therefore, Section III is incomplete, but an overview of the considerations with some of the design proces elements is presented. Section IV illustrates ease studies that utilize solar applications in the building design.

  5. Workbook on data analysis

    International Nuclear Information System (INIS)

    Hopke, P.K.

    2000-01-01

    As a consequence of various IAEA programmes to sample airborne particulate matter and determine its elemental composition, the participating research groups are accumulating data on the composition of the atmospheric aerosol. It is necessary to consider ways in which these data can be utilized in order to be certain that the data obtained are correct and that the information then being transmitted to others who may make decisions based on such information is as representative and correct as possible. In order to both examine the validity of those data and extract appropriate information from them, it is necessary to utilize a variety of data analysis methods. The objective of this workbook is to provide a guide with examples of utilizing data analysis on airborne particle composition data using a spreadsheet program (EXCEL) and a personal computer based statistical package (StatGraphics)

  6. Environmental Measurements Laboratory 2002 Unit Performance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-10-01

    This EML Unit Performance Plan provides the key goals and performance measures for FY 2002 and continuing to FY 2003. The purpose of the Plan is to inform EML's stakeholders and customers of the Laboratory's products and services, and its accomplishments and future challenges. Also incorporated in the Unit Performance Plan is EML's Communication Plan for FY 2002.

  7. English Grammar Workbook For Dummies

    CERN Document Server

    O'Sullivan, Nuala

    2010-01-01

    English Grammar Workbook For Dummies, UK Edition is grammar First Aid for anyone wanting to perfect their English and develop the practical skills needed to write and speak correctly. Each chapter focuses on key grammatical principles, with easy-to-follow theory and examples as well as practice questions and explanations. From verbs, prepositions and tenses, to style, expressions and tricky word traps, this hands-on workbook is essential for both beginners looking to learn and practise the basics of English grammar, and those who want to brush up skills they already have - quickly, easily, and

  8. Guidelines and workbook for assessment of organization and administration of utilities seeking operating license for a nuclear power plant. Guidelines for utility organization and administration plan. Volume 1

    International Nuclear Information System (INIS)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1985-08-01

    The Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The Guidelines allow for individual approaches to organizational structures to account for differences in plant size, number of operating units, number of plant sites, and the individual utility approach to providing technical support. These unique approaches, however, should meet the criteria of a reasoned, fully developed, and logically consistent focus on the user's organization in terms of organization of work, policies and procedures, staffing, and external relationships

  9. Kinesiology Workbook and Laboratory Manual.

    Science.gov (United States)

    Harris, Ruth W.

    This manual is written for students in anatomy, kinesiology, or introductory biomechanics courses. The book is divided into two sections, a kinesiology workbook and a laboratory manual. The two sections parallel each other in content and format. Each is divided into three corresponding sections: (1) Anatomical bases for movement description; (2)…

  10. Homemaking. A Reading & Language Workbook.

    Science.gov (United States)

    Mankoski, Linda C.

    Developed for use in the academic communication classroom of a middle school for the deaf, this student workbook is designed to reinforce the vocabulary and skills presented by the pre-vocational teacher in three areas of home economics: basic cooking, home care, and basic sewing. Each section contains new word lists, short stories, comprehension…

  11. Penerapan Workbook Matematika Berbasis Kontekstual

    Directory of Open Access Journals (Sweden)

    Tri Candra Wulandari

    2017-09-01

    Full Text Available Mathematics in primary schools still rely on textbooks and workbooks students were also issued by the government. In general, it seems simpler both from the teachers and students, because students only carry one book that contains a variety of subjects. Weak concept is very pronounced in mathematics. In integrated math into the thematic lessons, however, mathematics remains one of the subjects tested on a final school examinations. Teachers are preparing for the final exam had to work hard to repeat concepts ranging from grade 1 to grade 5. Therefore, it is necessary for teachers of proven strategies so that the material presented can be accepted students well. This research purposed to describe the application of contextual learning using math workbook. This study uses qualitative research with 30 research subjects third grade elementary school students in SDN Gandang I Malang. Data collection technique used documentation techniques and tests. Data analysis technique used qualitative descriptive analysis. After implementing the learning using the workbook, the average repeat is 86.96, the lowest score and the highest score each are 70 and 100. Based on the results obtained, contextual workbook that directly relate to the theme 7 that the energy source can be applied to the study of mathematics the third class at SDN Gadang I Malang.

  12. Preventing violence : a workbook for service station employers and workers

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This workbook can be used as a tool for training workers in violence prevention procedures for the workplace. It is intended to help employers and workers identify appropriate procedures and information for workers to follow specific to their worksite. According to British Columbia's Workers Compensation Act, employers must ensure the health and safety of their employees and any other workers present at their worksite. Workers are also have responsible for following established safe work procedures and protecting their own health and safety. This workbook describes general duties of supervisors, owners and suppliers and includes the forms needed to fill out, notably an inspection list; an action plan for travelling to and from work; an action plan for dealing with angry or abusive members of the public; a record of theft and robberies; and, a checklist for working alone. Regulations that relate to young and new worker orientation and training were also provided.

  13. The Oxford Picture Dictionary. Beginning Workbook.

    Science.gov (United States)

    Fuchs, Marjorie

    The beginning workbook of the Oxford Picture Dictionary is in full color and offers vocabulary reinforcement activities that correspond page for page with the dictionary. Clear and simple instructions with examples make it suitable for independent use in the classroom or at home. The workbook has up-to-date art and graphics, explaining over 3700…

  14. First Course in Japanese: Character Workbook.

    Science.gov (United States)

    Niwa, Tamako

    This character workbook is an introduction to Japanese writing designed to be used in conjunction with Parts One and Two of this introductory course in Japanese. All the "hiragana", several "katakana", and 88 Japanese characters are introduced in this text. The workbook, consisting of 30 lessons, is divided into three parts.…

  15. Sketching user experiences the workbook

    CERN Document Server

    Greenberg, Saul; Marquardt, Nicolai; Buxton, Bill

    2012-01-01

    In Sketching User Experiences: The Workbook, you will learn, through step-by-step instructions and exercises, various sketching methods that will let you express your design ideas about user experiences across time. Collectively, these methods will be your sketching repertoire: a toolkit where you can choose the method most appropriate for developing your ideas, which will help you cultivate a culture of experience-based design and critique in your workplace. Features standalone modules detailing methods and exercises for practitioners who want to learn and develop their sketching skills E

  16. Algebra II workbook for dummies

    CERN Document Server

    Sterling, Mary Jane

    2014-01-01

    To succeed in Algebra II, start practicing now Algebra II builds on your Algebra I skills to prepare you for trigonometry, calculus, and a of myriad STEM topics. Working through practice problems helps students better ingest and retain lesson content, creating a solid foundation to build on for future success. Algebra II Workbook For Dummies, 2nd Edition helps you learn Algebra II by doing Algebra II. Author and math professor Mary Jane Sterling walks you through the entire course, showing you how to approach and solve the problems you encounter in class. You'll begin by refreshing your Algebr

  17. Oxyacetylene Welding and Oxyfuel Cutting. Third Edition. Teacher Edition [and] Student Edition [and] Student Workbook.

    Science.gov (United States)

    Knapp, John; Harper, Eddie

    This Oklahoma curriculum guide, which includes a teacher edition, a student edition, and a student workbook, provides three units for a course on oxyacetylene welding, oxyfuel cutting, and cutting done with alternative fuels such as MAPP, propane, and natural gas. The three units are: "Oxyacetylene Welding"; "Oxyfuel Cutting";…

  18. Que bonito es leer! III. Cuaderno de ejercicios (How Nice It Is to Read! III. Workbook).

    Science.gov (United States)

    Dissemination and Assessment Center for Bilingual Education, Austin, TX.

    This is the third and last unit in a series designed to provide the Spanish-speaking child with a complete language arts and reading program for grades 1-3. It focuses on the development of decoding, encoding, comprehension, and interpretation skills. This third grade workbook, one component of the language arts unit, contains 22 chapters with…

  19. Housekeeping category corrective action unit work plan

    International Nuclear Information System (INIS)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process

  20. British Gas plans global gas unit expansion

    International Nuclear Information System (INIS)

    Vielvoye, R.

    1991-01-01

    This paper reports on developing a global gas business, a British Gas plc's strategy for evolving a state owned U.K. gas company to a privatized worldwide oil and gas giant. By 2000, BG's global gas business is expected to provide 20% of its revenues, compared with 40% each from its exploration and production operations and its U.K. gas business. The global gas unit (GGU) plans to meet its targets mainly through acquiring holdings in gas transmission and distribution companies around the world. In the 12 months since GGU was established, it has made two such major acquisitions in this area. BG acquired Consumers Gas Co., Ltd., Ontario, Canada's biggest natural gas distribution company, for $943.5 million. It also took a 10% stake in Catalana de Gas SA, Barcelona, the largest privately owned gas utility in Spain and in terms of number of customers, the fourth largest in western Europe. BG also is targeting additional revenues from developing gas fired cogeneration systems in developing countries with gas reserves but no established transmission and distribution systems

  1. RASCAL Version 2.0 workbook

    International Nuclear Information System (INIS)

    Athey, G.F.; McKenna, T.J.

    1993-05-01

    The Radiological Assessment System for Consequence Analysis, Version 2.0 (RASCAL 2.0) has been developed for use by the NRC personnel who respond to radiological emergencies. This workbook is intended to complement the RASCAL 2.0 User's Guide (NUREG/CR-5247, Vol. 1). The workbook contains exercises designed to familiarize the user with the computer based tools of RASCAL through hands-on problem solving. The workbook is composed of four major sections. The first part is a RASCAL familiarization exercise to acquaint the user with the operation of the forms, menus, on-line help, and documentation. The latter three parts contain exercises in using the three tools of RASCAL Version 2.0: DECAY, FM-DOSE, and ST-DOSE. Each section of exercises is followed by discussion on how the tools could be used to solve the problem

  2. Oracle PLSQL Programming A Developer's Workbook

    CERN Document Server

    Feuerstein, Steven

    2008-01-01

    However excellent they are, most computer books are inherently passive--readers simply take in text without having any opportunity to react to it. The Oracle PL/SQL Developer's Workbook is a different kind of animal! It's designed to engage you actively, to get you solving programming problems immediately, and to help you apply what you've learned about PL/SQL--and in the process deepen your knowledge of the language. By tackling the exercises in this workbook, you'll find yourself moving more rapidly along the learning curve to join the growing ranks of PL/SQL experts. The Oracle PL/SQL

  3. Pre-calculus workbook for dummies

    CERN Document Server

    Kuang, Yang

    2011-01-01

    Get the confidence and math skills you need to get started with calculus Are you preparing for calculus? This hands-on workbook helps you master basic pre-calculus concepts and practice the types of problems you'll encounter in the course. You'll get hundreds of valuable exercises, problem-solving shortcuts, plenty of workspace, and step-by-step solutions to every problem. You'll also memorize the most frequently used equations, see how to avoid common mistakes, understand tricky trig proofs, and much more. Pre-Calculus Workbook For Dummies is the perfect tool for anyone who wa

  4. United States Shipbuilding Standards Master Plan

    National Research Council Canada - National Science Library

    Horsmon, Jr, Albert W

    1992-01-01

    This Shipbuilding Standards Master Plan was developed using extensive surveys, interviews, and an iterative editing process to include the views and opinions of key persons and organizations involved...

  5. The Physics Workbook: A Needed Instructional Device.

    Science.gov (United States)

    Brekke, Stewart E.

    2003-01-01

    Points out the importance of problem solving as a fundamental skill and how students struggle with problem solving in physics courses. Describes a workbook developed as a solution to students' struggles that features simple exercises and advanced problem solving. (Contains 12 references.) (Author/YDS)

  6. FINANCIAL WORKBOOK Quick Reference -Budget Preparation 1 ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Alexandra Eustache

    FINANCIAL WORKBOOK. Quick Reference -Budget Preparation. 6. Enter detailed budget notes for each line item. Use the “add new row “ button if more rows are needed. (Refer to page 7 on user guider for more information on budget notes). 7. On the “indirect cost” sheet, enter a fixed percentage or amount(s) a. For fixed ...

  7. Micronesian Mathematics Program, Level 1, Children's Workbook.

    Science.gov (United States)

    Gring, Carolyn

    This workbook for children was prepared especially to accompany the level 1 Micronesian Mathematics Program Teacher's Guide. It is to be used to check whether children have learned concepts taught by activities and activity cards. Work is provided for such concepts as color recognition, categorizing, counting, ordering, numeration, contrasting,…

  8. The United Kingdom's School Asset Management Plans.

    Science.gov (United States)

    Jones, Alan

    1999-01-01

    Examines the U.K.'s Asset Management Plans (AMPs) designed to help Local Education Authorities (LEAs) identify and address the most important priorities in their school capital programs, and to help in their longer term planning and management of the school estate. Discusses AMP objectives, the stages of developing an AMP, and how the Department…

  9. Applying a workbook at Aikido lessons when teaching younger pupils

    Directory of Open Access Journals (Sweden)

    Vlasova O. P.

    2016-07-01

    Full Text Available the article is devoted to creating the structure and the contents of a workbook for the first year children learning Aikido. The results prove the effectiveness of using the workbook: children learn the material successfully, younger pupils get enough theoretical and practical Aikido skills during the course of this martial art.

  10. Thoughts & Views on the Gulf War. Facilitators Notes and Workbook.

    Science.gov (United States)

    Hollings, Rick; Berghoff, Beth K.

    This document presents a workbook and facilitator's notes designed for use with small groups or with individual students in secondary schools to help them cope with troubling events related to the Gulf War. The material contained in the workbook is designed to help students deal with each of seven stages that the mastery model sees individuals…

  11. Independent Study Workbooks for Proofs in Group Theory

    Science.gov (United States)

    Alcock, Lara; Brown, Gavin; Dunning, Clare

    2015-01-01

    This paper describes a small-scale research project based on workbooks designed to support independent study of proofs in a first course on abstract algebra. We discuss the lecturers' aims in designing the workbooks, and set these against a background of research on students' learning of group theory and on epistemological beliefs and study habits…

  12. Hyundai plans rubber unit despite overcapacity

    International Nuclear Information System (INIS)

    Hyoungjin Kim.

    1993-01-01

    Despite the oversupply of synthetic rubber in South Korea, the government has granted approval to Hyundai Petrochemical (Seoul) to build the country's second synthetic rubber unit, to be located alongside its petrochemical complex at Daesan. The plant is due for startup during second-half 1995, when the local market is expected to be in better balance. Hyundai will use Goodyear Tire ampersand Rubber technology for the plant, which will have annual capacities for 40,000 m.t. of polybutadiene rubber (BR), 30,000 m.t. of styrene butadiene rubber (SBR) and 12,000 m.t. of nitrile rubber (NBR). Styrene and butadiene requirements will be met from Hyundai's own production at Daesan. The current local producer of synthetic rubber is Korea Kumho Petrochemicals (Seoul), which has annual capacities for 150,000 m.t. of SBR, 95,000 m.t. of BR, and 10,000 m.t. of NBR. Korean SBR demand is about 141,000 m.t./year but is expected to increase to 161,000 m.t./year by 1996 and reach 194,000 m.t./year by the end of the decade

  13. Decommissioning Planning for Nuclear Units at the Oskarshamn Site

    International Nuclear Information System (INIS)

    Rannemalm, Thom; Eriksson, Joergen; Bergh, Niklas

    2016-01-01

    This paper will describe the process that OKG is now in and how the regulatory framework in Sweden is set out with EIA preparation, SAR updates, decommissioning plans etc. and how OKG plans to meet some of the challenges that need to be considered in front of the decommissioning. There will be a discussion on which strategic decisions will have priority and why. The paper will also discuss some of the difficulties with having a site with two units in decommissioning and one unit in power operation. (authors)

  14. B Plant treatment, storage, and disposal (TSD) units inspection plan

    International Nuclear Information System (INIS)

    Beam, T.G.

    1996-01-01

    This inspection plan is written to meet the requirements of WAC 173-303 for operations of a TSD facility. Owners/operators of TSD facilities are required to inspection their facility and active waste management units to prevent and/or detect malfunctions, discharges and other conditions potentially hazardous to human health and the environment. A written plan detailing these inspection efforts must be maintained at the facility in accordance with Washington Administrative Code (WAC), Chapter 173-303, ''Dangerous Waste Regulations'' (WAC 173-303), a written inspection plan is required for the operation of a treatment, storage and disposal (TSD) facility and individual TSD units. B Plant is a permitted TSD facility currently operating under interim status with an approved Part A Permit. Various operational systems and locations within or under the control of B Plant have been permitted for waste management activities. Included are the following TSD units: Cell 4 Container Storage Area; B Plant Containment Building; Low Level Waste Tank System; Organic Waste Tank System; Neutralized Current Acid Waste (NCAW) Tank System; Low Level Waste Concentrator Tank System. This inspection plan complies with the requirements of WAC 173-303. It addresses both general TSD facility and TSD unit-specific inspection requirements. Sections on each of the TSD units provide a brief description of the system configuration and the permitted waste management activity, a summary of the inspection requirements, and details on the activities B Plant uses to maintain compliance with those requirements

  15. Pre-calculus workbook for dummies

    CERN Document Server

    Gilman, Michelle Rose; Neal, Karina

    2009-01-01

    Get the confidence and the math skills you need to get started with calculus! Are you preparing for calculus? This easy-to-follow, hands-on workbook helps you master basic pre-calculus concepts and practice the types of problems you'll encounter in your cour sework. You get valuable exercises, problem-solving shortcuts, plenty of workspace, and step-by-step solutions to every problem. You'll also memorize the most frequently used equations, see how to avoid common mistakes, understand tricky trig proofs, and much more. 100s of Problems! Detailed, fully worked-out solutions to problem

  16. An Update on Asset Management Plans in the United Kingdom.

    Science.gov (United States)

    Patel, Mukund

    1999-01-01

    Describes a current project in the United Kingdom designed to improve school buildings. The use of Asset Management Plans (AMPs) in providing the means through which likely future needs are assessed, criteria for prioritization are set, and informed decisions on local spending are made are examined. (GR)

  17. Perinatal risks of planned home births in the United States.

    Science.gov (United States)

    Grünebaum, Amos; McCullough, Laurence B; Brent, Robert L; Arabin, Birgit; Levene, Malcolm I; Chervenak, Frank A

    2015-03-01

    We analyzed the perinatal risks of midwife-attended planned home births in the United States from 2010 through 2012 and compared them with recommendations from the American College of Obstetricians and Gynecologists (ACOG) and the American Academy of Pediatrics (AAP) for planned home births. Data from the US Centers for Disease Control and Prevention's National Center for Health Statistics birth certificate data files from 2010 through 2012 were utilized to analyze the frequency of certain perinatal risk factors that were associated with planned midwife-attended home births in the United States and compare them with deliveries performed in the hospital by certified nurse midwives. Home birth deliveries attended by others were excluded; only planned home births attended by midwives were included. Hospital deliveries attended by certified nurse midwives served as the reference. Perinatal risk factors were those established by ACOG and AAP. Midwife-attended planned home births in the United States had the following risk factors: breech presentation, 0.74% (odds ratio [OR], 3.19; 95% confidence interval [CI], 2.87-3.56); prior cesarean delivery, 4.4% (OR, 2.08; 95% CI, 2.0-2.17); twins, 0.64% (OR, 2.06; 95% CI, 1.84-2.31); and gestational age 41 weeks or longer, 28.19% (OR, 1.71; 95% CI, 1.68-1.74). All 4 perinatal risk factors were significantly higher among midwife-attended planned home births when compared with certified nurse midwives-attended hospital births, and 3 of 4 perinatal risk factors were significantly higher in planned home births attended by non-American Midwifery Certification Board (AMCB)-certified midwives (other midwives) when compared with home births attended by certified nurse midwives. Among midwife-attended planned home births, 65.7% of midwives did not meet the ACOG and AAP recommendations for certification by the American Midwifery Certification Board. At least 30% of midwife-attended planned home births are not low risk and not within

  18. Emergency response planning in hospitals, United States: 2003-2004.

    Science.gov (United States)

    Niska, Richard W; Burt, Catharine W

    2007-08-20

    This study presents baseline data to determine which hospital characteristics are associated with preparedness for terrorism and natural disaster in the areas of emergency response planning and availability of equipment and specialized care units. Information from the Bioterrorism and Mass Casualty Preparedness Supplements to the 2003 and 2004 National Hospital Ambulatory Medical Care Surveys was used to provide national estimates of variations in hospital emergency response plans and resources by residency and medical school affiliation, hospital size, ownership, metropolitan statistical area status, and Joint Commission accreditation. Of 874 sampled hospitals with emergency or outpatient departments, 739 responded for an 84.6 percent response rate. Estimates are presented with 95 percent confidence intervals. About 92 percent of hospitals had revised their emergency response plans since September 11, 2001, but only about 63 percent had addressed natural disasters and biological, chemical, radiological, and explosive terrorism in those plans. Only about 9 percent of hospitals had provided for all 10 of the response plan components studied. Hospitals had a mean of about 14 personal protective suits, 21 critical care beds, 12 mechanical ventilators, 7 negative pressure isolation rooms, and 2 decontamination showers each. Hospital bed capacity was the factor most consistently associated with emergency response planning and availability of resources.

  19. Emergency plans for civil nuclear installations in the United Kingdom

    International Nuclear Information System (INIS)

    Gronow, W.S.

    1984-01-01

    The operators of nuclear installations in the United Kingdom have plans to deal with accidents or emergencies at their nuclear sites. These plans provide for any necessary action, both on and off the nuclear site, to protect members of the public and are regularly exercised. The off-site actions involve the emergency services and other authorities which may be called upon to implement measures to protect the public in any civil emergency. In a recent review of these plans by Government Departments and agencies and the nuclear site operators, a number of possible improvements were identified. These improvements are concerned mainly with the provisions made for liaison with local and national authorities and for public information and have been incorporated into existing plans. An outline is given of the most likely consequences of an accidental release of radioactive material and the scope of emergency plans. Details are also provided on the responsibilities and functions of the operator and other organizations with duties under the plans and the arrangements made for public information. (author)

  20. Planning for decommissioning of Ignalina Nuclear Power Plant Unit-1

    International Nuclear Information System (INIS)

    Poskas, P.; Poskas, R.; Zujus, R.

    2002-01-01

    In accordance to Ignalina NPP Unit 1 Closure Law, the Government of Lithuania approved the Ignalina NPP Unit 1 Decommissioning Program until 2005. For enforcement of this program, the plan of measures for implementation of the program was prepared and approved by the Minister of Economy. The plan consists of two parts, namely technical- environmental and social-economic. Technical-environmental measures are mostly oriented to the safe management of spent nuclear fuel and operational radioactive waste stored at the plant and preparation of licensing documents for Unit 1 decommissioning. Social-economic measures are oriented to mitigate the negative social and economic impact on Lithuania, inhabitants of the region, and, particularly, on the staff of Ignalina NPP by means of creating favorable conditions for a balanced social and economic development of the region. In this paper analysis of planned radioactive waste management technologies, licensing documents for decommissioning, other technical-environmental and also social-economic measures is presented. Specific conditions in Lithuania important for defining the decommissioning strategy are highlighted. (author)

  1. WIPP Facility Work Plan for Solid Waste Management Units

    International Nuclear Information System (INIS)

    2000-01-01

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A

  2. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  3. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  4. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  5. Noche del Sol. Que Bonito Es Leer, II. Libro III. Cuaderno de Ejercicios (Night of the Sun. How Nice Reading Is, II. Book III. Workbook).

    Science.gov (United States)

    Dissemination and Assessment Center for Bilingual Education, Austin, TX.

    The lessons, games and exercises in the workbook are follow-up work for the units in the reader of the same title. There are many vocabulary, punctuation, and grammar exercises, and spelling games and drills. Additionally, there is an incomplete story for the child to finish by using appropriate words to complete each sentence. These exercises are…

  6. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  7. Developing a workbook to support the contextualisation of global health systems guidance: a case study identifying steps and critical factors for success in this process at WHO.

    Science.gov (United States)

    Alvarez, Elizabeth; Lavis, John N; Brouwers, Melissa; Schwartz, Lisa

    2018-03-02

    steps and the critical factors involved in the process of developing the workbook could help in the planning of similar and other tools aimed to support the implementation of WHO guidance. A plan for dissemination and implementation needs to be addressed during the preparation of these tools.

  8. Plutonium Finishing Plan (PFP) Treatment and Storage Unit Interim Status Closure Plan

    International Nuclear Information System (INIS)

    PRIGNANO, A.L.

    2000-01-01

    This document describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) Treatment and Storage Unit. The PFP Treatment and Storage Unit is located within the 234-52 Building in the 200 West Area of the Hanford Facility. Although this document is prepared based upon Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the PFP Treatment and Storage Unit manages transuranic mixed (TRUM) waste, there are many controls placed on management of the waste. Based on the many controls placed on management of TRUM waste, releases of TRUM waste are not anticipated to occur in the PFP Treatment and Storage Unit. Because the intention is to clean close the PFP Treatment and Storage Unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. The PFP Treatment and Storage Unit will be operated to immobilize and/or repackage plutonium-bearing waste in a glovebox process. The waste to be processed is in a solid physical state (chunks and coarse powder) and will be sealed into and out of the glovebox in closed containers. The containers of immobilized waste will be stored in the glovebox and in additional permitted storage locations at PFP. The waste will be managed to minimize the potential for spills outside the glovebox, and to preclude spills from reaching soil. Containment surfaces will be maintained to ensure

  9. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  10. [Population planning unit is developed in the Congo].

    Science.gov (United States)

    Amouali, C; Poukouta, P

    1989-01-01

    This article is an update on the demographic situation in the Congo and the institutionalization of a population unit in The Ministry of Plan. From 1974-84 the population increased 44.9% going from 1,319,790 to 1,912,429 at a growth rate of 3.48% and possibly doubling in 20 years (2005). However, the major transformation has been the growth of the urban areas over the rural. From 1974-84 the rural population went from 819,430 to 934,849 while the urban population went from 500,360 in 1974 to 977,580 in 1984. The growth rate of the rural areas was 1.22% while that for the urban was 6.38% Infant mortality rate stands at 73/1000; life expectancy is 46.9 for men and 50.0 for women. The average fertility rate is 6. This demographic situation with the inherent problems of the rapidly growing urbanization of the 2 principal cities, Brazzaville and Pointe-Noire, has led to problems in health services and high morbidity and mortality rates. The Government has created 3 national organizations to coordinate population activities in the country: 1) The National Council on Population, (1988) an interministerial council, presided over by the Prime Minister, that defines and formulates national population policies as integral components to the country's socioeconomic development plans; 2) The National Commission on Population (CONAPO), headed by the Minister of Plan, Finance and Economics as the administrative organ of The National Council on Population, and responsible for the technical and evaluation activities of The National Council on Population; and 3) The Population Planning Unit headed by the Director of Human Resources in the Ministry of Plan responsible for identifying, formulating and evaluating population policies in the Congo. These institutions were created as a result of the 1974 Bucharest Conference and the 1984 Arusha Conference were population and development were considered integral components, and of results of 2 censuses and population surveys highlighting

  11. Planning for a smooth transition: evaluation of a succession planning program for prospective nurse unit managers.

    Science.gov (United States)

    Manning, Vicki; Jones, Alan; Jones, Pamela; Fernandez, Ritin S

    2015-01-01

    The current and projected nurse workforce shortage has created significant pressure on health care organizations to examine their approach to managing talent. This includes the need for strategic development of new formal leaders. This article reports on a succession planning program for prospective nursing unit managers. Eight prospective management candidates participated in a Future Nursing Unit Managers program. The effectiveness of the program was measured through a comparison of pre- and postprogram surveys relating to participants' perception of personal managerial and leadership skills. Significant differences in scores from baseline to 6-month follow-up surveys were observed in the participants' confidence in undertaking the nursing unit manager role and in their management skills. Investment in structured programs to prepare nurses for leadership roles is strongly recommended as a management workforce strategy.

  12. RASCAL Version 2.1 workbook. Volume 2, Revision 2

    International Nuclear Information System (INIS)

    Athey, G.F.; Sjoreen, A.L.; McKenna, T.J.

    1994-12-01

    The Radiological Assessment System for Consequence Analysis, Version 2.1 (RASCAL 2.1) was developed for use by the NRC personnel who respond to radiological emergencies. This workbook complements the RASCAL 2.1 User's guide (NUREG/CR-5247, Vol. 1, Rev. 2). The workbook contains exercises designed to familiarize the user with the computer-based tools of RASCAL through hands-on problem solving. The workbook contains four major sections. The first is a RASCAL familiarization exercise to acquaint the user with the operation of the forms, menus, online help, and documentation. The latter three sections contain exercises in using the three tools of RASCAL Version 2.1: DECAY, FM-DOSE, and ST-DOSE. A discussion section describing how the tools could be used to solve the problems follows each set of exercises

  13. Integrated Waste Treatment Unit GFSI Risk Management Plan

    International Nuclear Information System (INIS)

    W. A. Owca

    2007-01-01

    This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP)

  14. Aquifer test plan for the 100-HR-3 Operable Unit

    International Nuclear Information System (INIS)

    Swanson, L.C.; Hartman, M.J.

    1994-01-01

    This test plan directs hydrologic testing activities planned at three existing Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) wells in the 100-HR-3 Operable Unit of the Hanford Site. Three additional wells will be installed near these existing wells and used as additional testing arid observation points during the field activities. Figure 1 shows the locations of the three test sites. A primary objective of the testing program is to provide more detailed hydraulic characterization information for the unconfined aquifer and targeted test sites than provided by the initial reconnaissance-level slug testing of Vukelich. A second objective is to evaluate the applicability of slug interference and dipole flow tests for detailed hydraulic characterization in an unconfined aquifer. This aquifer testing program will also be useful for substantiating hydraulic conductivities reported from previous slug tests and evaluating the effects of filter pack volume/configuration on slug test data. Vukelich recommended additional testing to address the latter two issues

  15. Effectiveness of a cognitive behavioural workbook for changing beliefs about antipsychotic polypharmacy: analysis from a cluster randomized controlled trial.

    Science.gov (United States)

    Thompson, Andrew; Sullivan, Sarah; Barley, Maddi; Moore, Laurence; Rogers, Paul; Sipos, Attila; Harrison, Glynn

    2010-06-01

    Educational workbooks have been used in psychiatry to influence patient but not clinician behaviour. Targeted education interventions to change prescribing practice in other areas of medicine have only looked at changes in prescribing and not attitudes or beliefs related to the prescribing. We aimed to examine whether clinicians' beliefs about a common prescribing issue in psychiatry (antipsychotic polypharmacy prescription) changed alongside behaviour as a result of a complex intervention. Medical and nursing staff were recruited from 19 general adult psychiatry units in the south-west of the UK as part of a cluster randomized controlled trial. A questionnaire was used to assess beliefs on the prescribing of antipsychotic polypharmacy as a secondary outcome before and after completion of a cognitive behavioural 'self-help' style workbook (one part of a complex intervention). A factor analysis suggested three dimensions of the questionnaire that corresponded to predetermined themes. The data were analysed using a random-effects regression model (adjusting for clustering) controlling for possible confounders. There was a significant change in beliefs on both of the factors: antipsychotic polypharmacy (coefficient = -0.89, P change in antipsychotic polypharmacy prescribing (odds ratio 0.43, 95% confidence intervals 0.21-0.90). The workbook appeared to change staff beliefs about antipsychotic polypharmacy, but achieving substantial changes in clinician behaviour may require further exploration of other factors important in complex prescribing issues.

  16. Ciencias 3. Caderno de Exercicios. (Science 3. Workbook).

    Science.gov (United States)

    Raposo, Lucilia

    This workbook contains 47 activities and exercises which reinforce lesson topics found in the grade 3 science textbook. These lesson topics, presented in nine sections in the textbook, focus on such areas as: (1) solar energy, electricity, and light; (2) solar system, planets, earth motions, and phases of the moon; (3) gravity, rocks, and erosion;…

  17. Sound. Physical Science in Action. Teacher's Manual and Workbook.

    Science.gov (United States)

    Chan, Janis Fisher; Friedland, Mary

    The Science in Action series is designed to teach practical science concepts to special-needs students. It is intended to develop students' problem-solving skills by teaching them to observe, record, analyze, conclude, and predict. This document contains a student workbook which deals with basic principles of physical science. Six separate units…

  18. Developing Critical Thinking Skills: Assessing the Effectiveness of Workbook Exercises

    Science.gov (United States)

    Wallace, Elise D.; Jefferson, Renee N.

    2015-01-01

    To address the challenge of developing critical thinking skills in college students, this empirical study examines the effectiveness of cognitive exercises in developing those skills. The study uses Critical Thinking: Building the Basics by Walter, Knudsvig, and Smith (2003). This workbook is specifically designed to exercise and develop critical…

  19. Fundamentals of Library Automation and Technology. Participant Workbook.

    Science.gov (United States)

    Bridge, Frank; Walton, Robert

    This workbook presents outlines of topics to be covered during a two-day workshop on the fundamentals for library automation. Topics for the first day include: (1) Introduction; (2) Computer Technology--A Historical Overview; (3) Evolution of Library Automation; (4) Computer Hardware Technology--An Introduction; (5) Computer Software…

  20. Financing Your Small Business: A Workbook for Financing Small Business.

    Science.gov (United States)

    Compton, Clark W.

    Designed to assist established businesspeople with the development of a loan proposal, this workbook offers information on sources of financing and step-by-step guidance on applying for a loan. After chapter I discusses borrowers' and lenders' attitudes towards money, chapter II offers suggestions for determining financial needs. Chapter III lists…

  1. Conducting Sanitary Surveys of Water Supply Systems. Student Workbook.

    Science.gov (United States)

    1976

    This workbook is utilized in connection with a 40-hour course on sanitary surveys of water supply systems for biologists, chemists, and engineers with experience as a water supply evaluator. Practical training is provided in each of the 21 self-contained modules. Each module outlines the purpose, objectives and content for that section. The course…

  2. Integrating spatial and biomass planning for the United States

    International Nuclear Information System (INIS)

    Wang, Sicong; Wang, Shifeng

    2016-01-01

    Biomass is low-carbon energy and has tremendous potential as an alternative to fossil fuels. However, the significant role of biomass in future low-carbon energy portfolio depends heavily on its consumption. The paper presents a first attempt to examine the spatial-temporal patterns of biomass consumption in the United States (US), using a novel method-spatial Seemingly Unrelated Regression (SUR) model, in order to strengthen the link between energy planning and spatial planning. In order to obtain the robust parameters of spatial SUR models and estimate the parameters efficiently, an iterative maximum likelihood method, which takes full advantage of the stationary characteristic of maximum likelihood estimation, has been developed. The robust parameters of models can help draw a proper inference for biomass consumption. Then the spatial-temporal patterns of biomass consumption in the US at the state level are investigated using the spatial SUR models with the estimation method developed and data covering the period of 2000–2012. Results show that there are spatial dependences among biomass consumption. The presence of spatial dependence in biomass consumption has informative implications for making sustainable biomass polices. It suggests new efforts to adding a cross-state dimension to state-level energy policy and coordinating some elements of energy policy across states are still needed. In addition, results consistent with classic economic theory further proves the correctness of applying the spatial SUR models to investigate the spatial-temporal patterns of biomass consumption. - Highlights: • A spatial model is suggested as framework to investigate biomass consumption. • A new estimation method is developed to obtain the robust parameters of model. • There are spatial dependences among biomass consumption. • The spatial dependence can contribute to making sustainable biomass policies. • Efforts to adding cross-state dimension to state

  3. The ICF Status and Plans in the United States

    International Nuclear Information System (INIS)

    Moses, E; Miller, G; Kauffman, R

    2005-01-01

    The United States continues to maintain its leadership in ICF as it moves toward the goal of ignition. The flagship of the program is the National Ignition Facility (NIF) presently under construction at LLNL. Experiments had begun on the first four beams of the National Ignition Facility just at the time of the last IFSA Conference. Several new successful campaigns have been conducted since then in planar hydrodynamics and hohlraums as well as activating the VISAR diagnostic for equation of state experiments. Highlights of these results will be reviewed. Presently, the four beam experimental capability has been suspended while the first eight beams are being installed as the first step in building out the project. Meanwhile, much progress has been made in developing ignition designs for using NIF. An array of designs having several ablator materials have been shown computationally to ignite with energies ranging from the design energy to as low as 1 MJ of laser energy. Alternative direct drive designs in the NIF indirect drive configuration have been developed by LLE. This wide array of design choices has increased the chance of achieving ignition sooner on the facility. Plans are now being developed to begin an ignition experimental campaign on NIF in 2010, a little over a year after completion of the facility. Other US facilities are also implementing improved capabilities. Petawatt lasers are now under construction at the University of Rochester and Sandia National Laboratory. The Z pulsed power machine at Sandia National Laboratory is being refurbished to improve its performance. The ongoing research program at the OMEGA laser at the University of Rochester and the Z machine at Sandia National Laboratory as well as at the Nike, Trident and Janus lasers remain strong, performing experiments supporting the NIF ignition plan and direct drive ignition. There also is an active program in the broader field of high energy density science on these facilities. These

  4. Comprehensive Early Stimulation Program for Infants. Instruction Manual [and] Early Interventionist's Workbook [and] Parent/Caregiver Workbook. William Beaumont Hospital Speech and Language Pathology Series.

    Science.gov (United States)

    Santana, Altagracia A.; Bottino, Patti M.

    This early intervention kit includes a Comprehensive Early Stimulation Program for Infants (CESPI) instruction manual, an early interventionist workbook, and ten parent/caregiver workbooks. The CESPI early intervention program is designed to provide therapists, teachers, other health professionals, and parents with a common-sense, practical guide…

  5. The ICF status and plans in the United States

    International Nuclear Information System (INIS)

    Moses, E.I.; Miller, G.H.; Kauffman, R.L.

    2006-01-01

    The United States continues to maintain its leadership in inertial confinement fusion as it moves toward the goal of ignition. The flagship of the program is the National Ignition Facility (NIF) presently under construction at Lawrence Livermore National Laboratory. Experiments had begun on the first four beams of the National Ignition Facility just at the time of the last IFSA Conference. Several new successful campaigns have been conducted since then in planar hydrodynamics and hohlraums as well as activating the VISAR diagnostic for equation of state experiments. Highlights of these results will be reviewed. Presently, the four beam experimental capability has been suspended while the first eight beams are being installed as the first step in building out the project. Meanwhile, much progress has been made in developing ignition designs for using NIF. An array of designs having several ablator materials have been shown computationally to ignite with energies ranging from the design energy to as low as 1 MJ of laser energy. Alternative direct drive designs in the NIF indirect drive configuration have been developed by LLE. This wide array of design choices has increased the chance of achieving ignition sooner on the facility. Plans are now being developed to begin an ignition experimental campaign on NIF in 2010, a little over a year after completion of the facility. Other US facilities are also implementing improved capabilities. Peta-watt lasers are now under construction at the University of Rochester and Sandia National Laboratory. The Z pulsed power machine at Sandia National Laboratory is being refurbished to improve its performance. The ongoing research program at the OMEGA laser at the University of Rochester and the Z machine at Sandia National Laboratory as well as at the Nike, Trident and Janus lasers remain strong, performing experiments supporting the NIF ignition plan and direct drive ignition. There also is an active program in the broader field of

  6. The ICF status and plans in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Moses, E.I.; Miller, G.H.; Kauffman, R.L. [Lawrence Livermore National Laboratory, Livermore, CA (United States)

    2006-06-15

    The United States continues to maintain its leadership in inertial confinement fusion as it moves toward the goal of ignition. The flagship of the program is the National Ignition Facility (NIF) presently under construction at Lawrence Livermore National Laboratory. Experiments had begun on the first four beams of the National Ignition Facility just at the time of the last IFSA Conference. Several new successful campaigns have been conducted since then in planar hydrodynamics and hohlraums as well as activating the VISAR diagnostic for equation of state experiments. Highlights of these results will be reviewed. Presently, the four beam experimental capability has been suspended while the first eight beams are being installed as the first step in building out the project. Meanwhile, much progress has been made in developing ignition designs for using NIF. An array of designs having several ablator materials have been shown computationally to ignite with energies ranging from the design energy to as low as 1 MJ of laser energy. Alternative direct drive designs in the NIF indirect drive configuration have been developed by LLE. This wide array of design choices has increased the chance of achieving ignition sooner on the facility. Plans are now being developed to begin an ignition experimental campaign on NIF in 2010, a little over a year after completion of the facility. Other US facilities are also implementing improved capabilities. Peta-watt lasers are now under construction at the University of Rochester and Sandia National Laboratory. The Z pulsed power machine at Sandia National Laboratory is being refurbished to improve its performance. The ongoing research program at the OMEGA laser at the University of Rochester and the Z machine at Sandia National Laboratory as well as at the Nike, Trident and Janus lasers remain strong, performing experiments supporting the NIF ignition plan and direct drive ignition. There also is an active program in the broader field of

  7. Guidelines and workbook for of organization and administration of utilities seeking operating license for a nuclear power plant. Workbook for assessment of organization and management. Volume, 2, Revision 1

    International Nuclear Information System (INIS)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1986-09-01

    This report is a partial response to the requirements of Item I.B.1.1 of the ''NRC Action Plan Developed as a Result of the TMI-2 Accident,'' NUREG-0660, and is designed to serve as a basis for replacing the earlier NUREG-0731, ''Guidelines for Utility Management Structure and Technical Resources.'' The Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The purpose of the Workbook is to guide the NRC reviewer through a systematic review and assessment of a proposed organization and administration. It is the NRC's intention to incorporate these Guidelines and Workbook into a future revision of the Standard Review Plan (SRP), NUREG-0800. However, at this time the report is being published so that the material may be used on a voluntary basis by industry to systematically prepare or evaluate their organization or administration plans. Use of the report by the NRC would not occur until after it has been incorporated in the SRP

  8. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  9. Primary Teachers' Written Unit Plans in Mathematics and Their Perceptions of Essential Elements of These

    Science.gov (United States)

    Roche, Anne; Clarke, Doug M.; Clarke, David J.; Sullivan, Peter

    2014-01-01

    The content and purpose of written unit plans in mathematics is an under-researched area. In this article, we provide a brief overview of research on teachers' planning processes and the place of mental and written plans. We report on data from a questionnaire completed by 357 teachers from Victorian Catholic primary schools, where we focused on…

  10. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  11. An Excel Workbook for Identifying Redox Processes in Ground Water

    Science.gov (United States)

    Jurgens, Bryant C.; McMahon, Peter B.; Chapelle, Francis H.; Eberts, Sandra M.

    2009-01-01

    The reduction/oxidation (redox) condition of ground water affects the concentration, transport, and fate of many anthropogenic and natural contaminants. The redox state of a ground-water sample is defined by the dominant type of reduction/oxidation reaction, or redox process, occurring in the sample, as inferred from water-quality data. However, because of the difficulty in defining and applying a systematic redox framework to samples from diverse hydrogeologic settings, many regional water-quality investigations do not attempt to determine the predominant redox process in ground water. Recently, McMahon and Chapelle (2008) devised a redox framework that was applied to a large number of samples from 15 principal aquifer systems in the United States to examine the effect of redox processes on water quality. This framework was expanded by Chapelle and others (in press) to use measured sulfide data to differentiate between iron(III)- and sulfate-reducing conditions. These investigations showed that a systematic approach to characterize redox conditions in ground water could be applied to datasets from diverse hydrogeologic settings using water-quality data routinely collected in regional water-quality investigations. This report describes the Microsoft Excel workbook, RedoxAssignment_McMahon&Chapelle.xls, that assigns the predominant redox process to samples using the framework created by McMahon and Chapelle (2008) and expanded by Chapelle and others (in press). Assignment of redox conditions is based on concentrations of dissolved oxygen (O2), nitrate (NO3-), manganese (Mn2+), iron (Fe2+), sulfate (SO42-), and sulfide (sum of dihydrogen sulfide [aqueous H2S], hydrogen sulfide [HS-], and sulfide [S2-]). The logical arguments for assigning the predominant redox process to each sample are performed by a program written in Microsoft Visual Basic for Applications (VBA). The program is called from buttons on the main worksheet. The number of samples that can be analyzed

  12. Fundamentals of passive nondestructive assay of fissionable material: laboratory workbook

    International Nuclear Information System (INIS)

    Reilly, T.D.; Augustson, R.H.; Parker, J.L.; Walton, R.B.; Atwell, T.L.; Umbarger, C.J.; Burns, C.E.

    1975-02-01

    This workbook is a supplement to LA-5651-M, ''Fundamentals of Passive Nondestructive Assay of Fissionable Material'' which is the text used during the Nondestructive Assay Training Session given by Group A-1 of the Los Alamos Scientific Laboratory. It contains the writeups used during the six laboratory sessions covering basic gamma-ray principles, quantitative gamma-ray measurements, uranium enrichment measurements, equipment holdup measurements, basic neutron principles, and quantitative neutron assay

  13. Fundamentals of passive nondestructive assay of fissionable material: laboratory workbook

    Energy Technology Data Exchange (ETDEWEB)

    Reilly, T.D.; Augustson, R.H.; Parker, J.L. Walton, R.B.; Atwell, T.L.; Umbarger, C.J.; Burns, C.E.

    1975-02-01

    This workbook is a supplement to LA-5651-M, ''Fundamentals of Passive Nondestructive Assay of Fissionable Material'' which is the text used during the Nondestructive Assay Training Session given by Group A-1 of the Los Alamos Scientific Laboratory. It contains the writeups used during the six laboratory sessions covering basic gamma-ray principles, quantitative gamma-ray measurements, uranium enrichment measurements, equipment holdup measurements, basic neutron principles, and quantitative neutron assay.

  14. The educational theory underpinning a clinical workbook for VERT

    Energy Technology Data Exchange (ETDEWEB)

    Nisbet, Heather, E-mail: heather.nisbet@orh.nhs.u [Department of Clinical Oncology, Churchill Hospital, Old Road, Headington, Oxford, Oxon OX3 7LJ (United Kingdom); Matthews, Sara [Department of Clinical Oncology, Churchill Hospital, Old Road, Headington, Oxford, Oxon OX3 7LJ (United Kingdom)

    2011-02-15

    The introduction of VERT (Virtual Environment for Radiotherapy Training) into radiotherapy departments across England was in response to the National Radiotherapy Advisory Group's (NRAG) recommendation to the Department of Health that it may assist in enhancing the clinical learning experience of student radiotherapy radiographers. It was suggested that this may help to reduce the high attrition rate of students currently experienced, particularly in the first year of training. This paper investigates how VERT may be used in the clinical setting to develop the skills of students, in order to meet this vision. We argue that using an epistemological approach, i.e. using the theory of knowledge, to support the design of the learning resource, is key to enabling the educator to fulfil these expectations. We describe the design of a generic VERT workbook for use in the clinical departments that train students for the University of Hertfordshire. The use of educational theory to underpin the aims and inform the development of the workbook is examined. We then discuss the alignment of the workbook with the curriculum in order to enhance the students' learning experience and nurture their clinical competence. Finally, we will consider the teaching strategies used during the delivered sessions and discuss how we believe they will allow us to achieve these aims.

  15. The educational theory underpinning a clinical workbook for VERT

    International Nuclear Information System (INIS)

    Nisbet, Heather; Matthews, Sara

    2011-01-01

    The introduction of VERT (Virtual Environment for Radiotherapy Training) into radiotherapy departments across England was in response to the National Radiotherapy Advisory Group's (NRAG) recommendation to the Department of Health that it may assist in enhancing the clinical learning experience of student radiotherapy radiographers. It was suggested that this may help to reduce the high attrition rate of students currently experienced, particularly in the first year of training. This paper investigates how VERT may be used in the clinical setting to develop the skills of students, in order to meet this vision. We argue that using an epistemological approach, i.e. using the theory of knowledge, to support the design of the learning resource, is key to enabling the educator to fulfil these expectations. We describe the design of a generic VERT workbook for use in the clinical departments that train students for the University of Hertfordshire. The use of educational theory to underpin the aims and inform the development of the workbook is examined. We then discuss the alignment of the workbook with the curriculum in order to enhance the students' learning experience and nurture their clinical competence. Finally, we will consider the teaching strategies used during the delivered sessions and discuss how we believe they will allow us to achieve these aims.

  16. 40 CFR 60.2991 - What incineration units must I address in my State plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What incineration units must I address... and Compliance Times for Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Applicability of State Plans § 60.2991 What incineration units must I address in my State...

  17. Electric Utility Generating Units: Repealing the Clean Power Plan

    Science.gov (United States)

    The Clean Power Plan established emission guidelines for states to follow in limiting carbon dioxide (CO2) emissions from existing power plants. EPA is proposing to repeal the CPP and rescind the accompanying legal memorandum.

  18. The Entrance test of physics and Workbook in teaching of physics at secondary vocational school within long-term pedagogical research

    Science.gov (United States)

    Kerlínová, Věra

    2017-01-01

    Within the long-term pedagogical research ongoing since the school year 2008/2009 to 2015/2016 at the secondary vocational school in Bohumín was through of Entrance test of physics, which included curriculum of the sixth to ninth year of elementary school, regularly finding out, in which parts of Entrance test - Unit conversions, International System of Units, Properties of matter, Mechanics, Thermodynamics, Electricity and Magnetism, Optics, Atoms and Universe - pupils of the 1st years of secondary vocational school, technical and non-technical, reach a higher number of correct answers, in which dominates the wrong answers and which parts of the test pupils are better left out completely. It turned out that the results of these tests are very informative not only for theoretical and practical teaching, but also technical and other science subjects. The results of the Entrance tests are also a valuable source of information for continuous innovation Workbook of Physics - Mechanics for the 1st year of secondary vocational schools [1] - whose the first version began during the school year 2007/2008 and which was tested within pre-research in school years 2008/2009, 2009/2010 and within research in school year 2010/2011. On the basis of feedbacks getting from research the Workbook is regularly expanded, innovated and updated. The Workbook consists of parts dedicated to physical concepts, physical tasks, proposals to physical experiments, pupils comments from viewed video projection and documentary films, examples from the world of science and technology, examples from practice and real life, physical terminology in English, quizzes, competitions, interesting things and links related to discussed curriculum. The Workbook is divided into thematic sections, chapters and subchapters similar as physics textbooks for pupils of the 1st years of Secondary Schools in the Czech Republic. In the Workbook there are included tasks on fill in the words, polynomial tasks with

  19. Standard Chinese: A Modular Approach. Student Workbook. Module 1: Orientation; Module 2: Biographic Information.

    Science.gov (United States)

    Defense Language Inst., Monterey, CA.

    Texts in spoken Standard Chinese were developed to improve and update Chinese materials to reflect current usage in Beijing and Taipei. The focus is on communicating in Chinese in practical situations. The overall course is organized into 10 modules, student workbooks, and resource modules. This workbook covers the orientation and biographic…

  20. Standard Chinese: A Modular Approach. Student Workbook. Module 3: Money; Module 4: Directions.

    Science.gov (United States)

    Defense Language Inst., Monterey, CA.

    Texts in spoken Standard Chinese were developed to improve and update Chinese materials and to reflect current usage in Beijing and Taipei. The focus is on communicating in Chinese in practical situations. The overall course is organized into 10 situational modules, student workbooks, and resource modules. This workbook covers the money and…

  1. A Workbook for Scaffolding Mentored Undergraduate Research Experiences in the Social and Behavioral Sciences

    Science.gov (United States)

    Colbert-White, Erin; Simpson, Elizabeth

    2017-01-01

    Research mentors strive to ensure that undergraduates gain research skills and develop professionally during mentored research experiences in the sciences. We created the SURE (Specialized Undergraduate Research Experience) Workbook, a freely-available, interactive guide to scaffold student learning during this process. The Workbook: (1)…

  2. Evaluating an Active Learning Approach to Teaching Introductory Statistics: A Classroom Workbook Approach

    Science.gov (United States)

    Carlson, Kieth A.; Winquist, Jennifer R.

    2011-01-01

    The study evaluates a semester-long workbook curriculum approach to teaching a college level introductory statistics course. The workbook curriculum required students to read content before and during class and then work in groups to complete problems and answer conceptual questions pertaining to the material they read. Instructors spent class…

  3. Basic CNC Operation. Training Workbook [and] Assessment and Training Guide [and] Hands-on Assessment.

    Science.gov (United States)

    Anoka-Hennepin Technical Coll., Minneapolis, MN.

    This workbook is intended for students taking a course in basic computer numerical control (CNC) operation that was developed during a project to retrain defense industry workers at risk of job loss or dislocation because of conversion of the defense industry. The workbook contains daily training guides for each of the course's 13 sessions. Among…

  4. [Continuing training plan in a clinical management unit].

    Science.gov (United States)

    Gamboa Antiñolo, Fernando Miguel; Bayol Serradilla, Elia; Gómez Camacho, Eduardo

    2011-01-01

    Continuing Care Unit (UCA) focused the attention of frail patients, polypathological patients and palliative care. UCA attend patients at home, consulting, day unit, telephone consulting and in two hospitals of the health area. From 2002 UCA began as a management unit, training has been a priority for development. Key elements include: providing education to the workplace, including key aspects of the most prevalent health care problems in daily work, directing training to all staff including organizational aspects of patient safety and the environment, improved working environment, development of new skills and knowledge supported by the evidence-based care for the development of different skills. The unit can be the ideal setting to undertake the reforms necessary conceptual training of professionals to improve the quality of care. 2010 SESPAS. Published by Elsevier Espana. All rights reserved.

  5. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 543: Liquid Disposal Units is listed in Appendix III of the ''Federal Facility Agreement and Consent Order'' (FFACO) which was agreed to by the state of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (FFACO, 1996). CAU 543 sites are located in Areas 6 and 15 of the Nevada Test Site (NTS), which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven Corrective Action Sites (CASs) (Figure 1): CAS 06-07-01, Decon Pad; CAS 15-01-03, Aboveground Storage Tank; CAS 15-04-01, Septic Tank; CAS 15-05-01, Leachfield; CAS 15-08-01, Liquid Manure Tank; CAS 15-23-01, Underground Radioactive Material Area; and CAS 15-23-03, Contaminated Sump, Piping. All Area 15 CASs are located at the former U.S. Environmental Protection Agency (EPA) Farm, which operated from 1963 to 1981 and was used to support animal experiments involving the uptake of radionuclides. Each of the Area 15 CASs, except CAS 15-23-01, is associated with the disposal of waste effluent from Building 15-06, which was the primary location of the various tests and experiments conducted onsite. Waste effluent disposal from Building 15-06 involved piping, sumps, outfalls, a septic tank with leachfield, underground storage tanks, and an aboveground storage tank (AST). CAS 15-23-01 was associated with decontamination activities of farm equipment potentially contaminated with radiological constituents, pesticides, and herbicides. While the building structures were removed before the investigation took place, all the original tanks, sumps, piping, and concrete building pads remain in place. The Area 6 CAS is located at the Decontamination Facility in Area 6, a facility which operated from 1971 to 2001 and was used to decontaminate vehicles, equipment, clothing, and other materials that had become contaminated during nuclear testing activities. The CAS includes the effluent collection and distribution systems for Buildings

  6. Out-pile test plan for lifetime extension of shutoff units in HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Joe, Y. G.; Lee, J. H.; Jeong, Y. H.; Woo, S. I.; Ryu, J. S.; Kim, Y. G.; Park, Y. C.; Kim, H. G.; Woo, J. S. [KAERI, Taejon (Korea, Republic of)

    2003-10-01

    It is estimated that the number of drops of shutoff rods in HANARO will reach the endurance verified numbers before the end of the reactor life. To resolve this situation, we have a plan to prepare of a new spare unit by the performance verification test for the local product, and extend the lifetime of shutoff units installed in the reactor by performing an additional endurance test in the out-pile test facility using an existing spare unit. This paper describes the overall situations and test plan for the out-pile test to extend the lifetime extension of shutoff unit.

  7. Down the Road...Long Range Planning for Automation.

    Science.gov (United States)

    Texas State Library, Austin. Dept. of Library Development.

    The materials in this manual/workbook were prepared to assist participants in a workshop on long-range planning for library automation. Chapters cover the following topics: (1) "What Is Long-Range Planning?" (2) "Why Plan?" (3) "Who Needs to Participate?" (4) "Planning to Plan"; (5) "Determining Needs"; (6) "Description and Introduction"; (7)…

  8. 75 FR 39493 - United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015

    Science.gov (United States)

    2010-07-09

    ... plan includes the USPTO's mission statement, vision statement and a description of the strategic goals... achieve its vision. Full details on how the USPTO plans to implement the strategic plan, including funding...] United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015 AGENCY: United States...

  9. Nuclear reactors built, being built, or planned in the Unites States as of June 30, 1981

    International Nuclear Information System (INIS)

    Goulden, A.M.

    1983-01-01

    Nuclear Reactors Built, Being Built, or Planned contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of June 30, 1981, which are capable of sustaining a nuclear chain reaction. Information is presented in five parts, each of which is categorized by primary function or pupose: civilian, military, production, export, and critical assembly facilities

  10. Nuclear reactors built, being built, or planned in the United States as of December 31, 1980

    International Nuclear Information System (INIS)

    1981-04-01

    Nuclear Reactors Built, Being Built, or Planned contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1980, which are capable of sustaining a nuclear chain reaction. Information is presented in five parts, each of which is categorized by primary function or purpose: civilian, military, production, export, and critical assembly facilities

  11. Innovative solutions: sample financial management business plan: neurosurgical intensive care unit.

    Science.gov (United States)

    Villanueva-Baldonado, Analiza; Barrett-Sheridan, Shirley E

    2010-01-01

    This article describes one institution's intention to implement a financial management business plan for a neurosurgical intensive care unit in a level I trauma center. The financial objective of this proposed business plan includes a service increase in the patient population requiring critical care in a way that will help control costs.

  12. Physical and Visual Accessibilities in Intensive Care Units: A Comparative Study of Open-Plan and Racetrack Units.

    Science.gov (United States)

    Rashid, Mahbub; Khan, Nayma; Jones, Belinda

    2016-01-01

    This study compared physical and visual accessibilities and their associations with staff perception and interaction behaviors in 2 intensive care units (ICUs) with open-plan and racetrack layouts. For the study, physical and visual accessibilities were measured using the spatial analysis techniques of Space Syntax. Data on staff perception were collected from 81 clinicians using a questionnaire survey. The locations of 2233 interactions, and the location and length of another 339 interactions in these units were collected using systematic field observation techniques. According to the study, physical and visual accessibilities were different in the 2 ICUs, and clinicians' primary workspaces were physically and visually more accessible in the open-plan ICU. Physical and visual accessibilities affected how well clinicians' knew their peers and where their peers were located in these units. Physical and visual accessibilities also affected clinicians' perception of interaction and communication and of teamwork and collaboration in these units. Additionally, physical and visual accessibilities showed significant positive associations with interaction behaviors in these units, with the open-plan ICU showing stronger associations. However, physical accessibilities were less important than visual accessibilities in relation to interaction behaviors in these ICUs. The implications of these findings for ICU design are discussed.

  13. Guidelines for planning and design of mobile radiological units

    International Nuclear Information System (INIS)

    Schelenz, R.

    1995-01-01

    A significant number of mobile radiological units are in operation worldwide aiming to provide reliable radiological data. They mainly have been designed and constructed on a national basis according to the particular needs and commitments of the specific laboratory or country. In most cases, these units are intended to be used in emergency situations for in-situ radiological measurements of accidentally released radioactivity, sometimes for monitoring environmental pollution. As the purpose of these units is very diversified in regard to the kind of vehicle and its in-built measuring equipment the varying outfit of these units cannot be adopted in general for other countries aiming to improve their capability for in-situ radiological measurement. In order to achieve harmonization of equipment and comparability of radiological data being obtained from field measurements it is necessary to have general guidelines available for designing mobile radiological units taking into account different sceneries and tasks to be achieved. In the very early stages of an accident most of the information available on the quantity of radioactive material being released, its radionuclide composition and the likely progression of the accident will come from the operator, and will be based on the conditions in the plant. Few environmental monitoring results from off-side can be expected within the first few hours. In this very early phase, decisions on the application of protective measures will therefore, be based largely on plant status and forecasts of changes in that status as well as on meteorological data. As time progresses, results will increasingly become available from the monitoring of radionuclides in the environment (e.g. dose rates and concentration of radionuclides in air and particular materials such as water, food etc). Monitoring results can be used to estimate potential doses to people and the need for further protective measures can thus be determined from a

  14. Guidelines for planning and design of mobile radiological units

    Energy Technology Data Exchange (ETDEWEB)

    Schelenz, R [Federal Office for Environmental Radioactivity in Food, Total Diet and Infant Food, Federal Research Centre for Nutrition, Karlsruhe (Germany)

    1995-07-01

    A significant number of mobile radiological units are in operation worldwide aiming to provide reliable radiological data. They mainly have been designed and constructed on a national basis according to the particular needs and commitments of the specific laboratory or country. In most cases, these units are intended to be used in emergency situations for in-situ radiological measurements of accidentally released radioactivity, sometimes for monitoring environmental pollution. As the purpose of these units is very diversified in regard to the kind of vehicle and its in-built measuring equipment the varying outfit of these units cannot be adopted in general for other countries aiming to improve their capability for in-situ radiological measurement. In order to achieve harmonization of equipment and comparability of radiological data being obtained from field measurements it is necessary to have general guidelines available for designing mobile radiological units taking into account different sceneries and tasks to be achieved. In the very early stages of an accident most of the information available on the quantity of radioactive material being released, its radionuclide composition and the likely progression of the accident will come from the operator, and will be based on the conditions in the plant. Few environmental monitoring results from off-side can be expected within the first few hours. In this very early phase, decisions on the application of protective measures will therefore, be based largely on plant status and forecasts of changes in that status as well as on meteorological data. As time progresses, results will increasingly become available from the monitoring of radionuclides in the environment (e.g. dose rates and concentration of radionuclides in air and particular materials such as water, food etc). Monitoring results can be used to estimate potential doses to people and the need for further protective measures can thus be determined from a

  15. 40 CFR 60.2555 - What combustion units are exempt from my State plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What combustion units are exempt from... Construction On or Before November 30, 1999 Applicability of State Plans § 60.2555 What combustion units are... metals which are reclaimed and reused as catalysts or used to produce commercial grade catalysts. (5...

  16. Status and plans of the united states ICF program

    Science.gov (United States)

    Matzen, M. K.

    2008-05-01

    Inertial confinement fusion research in the United States focuses on demonstrating ignition on the NIF at the beginning of the next decade and on broad high energy density science (HEDS) research. Three facilities (OMEGA EP, the refurbished Z, and NIF) will be completed in the next two years. The US approach emphasizes lasers and pulsed power and both direct and indirect drive. Since IFSA 2005 in Biarritz, France significant advances have been made towards demonstrating ignition in a joint effort by LLNL, LLE, LANL, SNL, and GA. An active HEDS research program will also be pursued on these new facilities.

  17. Status and plans of the united states ICF program

    International Nuclear Information System (INIS)

    Matzen, M K

    2008-01-01

    Inertial confinement fusion research in the United States focuses on demonstrating ignition on the NIF at the beginning of the next decade and on broad high energy density science (HEDS) research. Three facilities (OMEGA EP, the refurbished Z, and NIF) will be completed in the next two years. The US approach emphasizes lasers and pulsed power and both direct and indirect drive. Since IFSA 2005 in Biarritz, France significant advances have been made towards demonstrating ignition in a joint effort by LLNL, LLE, LANL, SNL, and GA. An active HEDS research program will also be pursued on these new facilities

  18. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  19. STEM-based workbook: Enhancing students' STEM competencies on lever system

    Science.gov (United States)

    Sejati, Binar Kasih; Firman, Harry; Kaniawati, Ida

    2017-05-01

    Twenty-first century is a century of technology, a rapid development of scientific studies and technology make them relied heavily on each other. This research investigated about the effect of STEM-based workbook in enhancing students' STEM competencies in terms of knowledge understanding, problem solving skill, innovative abilities, and responsibility. The workbook was tried on 24 students that applied engineering design processes together with mathematics and science knowledge to design and create an egg cracker. The result showed that the implementation of STEM-based workbook on lever system in human body is effective to improve students' STEM competencies, it can be proven by students' result on their knowledge understanding improvement which can be seen from normalized gain () score is 0.41 and categorized as medium improvement, students' problem solving skill is also improving where it obtained a medium improvement with normalized gain as much as 0.45. Innovative abilities also encountered an the improvement, the workbook analysis obtained a higher score which means students can be more innovative after finishing their workbook. Last, students' responsibility is keep improving day by day, students' effort gain the highest score it means that the students become more responsible after implementation of STEM-based workbook. All of the results are supported with the response of students towards STEM-based workbook implementation which showed positive response in all indicators.

  20. CASH FLOW-FINANCIAL PLANNING TOOL IN THE TOURISM UNITS

    Directory of Open Access Journals (Sweden)

    Boby COSTI

    2017-05-01

    Full Text Available This paper addresses the issue of cash-flow tool for financial planning, cash flow calculation by applying the indirect method within a company in the field of tourism. Thus, it tackled issues concerning the organization of accounting of treasury which made a presentation of the subject reflected in treasury accounting record of the existence and movement of securities placement, availability of the accounts at banks, short term bank loans and other cash values. The importance of access to information as well as more detailed and clearer leads to an upward trend of the tourism society. Standardization of definitions helps to ensure that all parties are talking of the same terms or concepts with lower or no variables. This is essential for developers and contractors in different geographical regions of the world and different countries when they discuss issues of tourism and travel.

  1. Generation unit selection via capital asset pricing model for generation planning

    Energy Technology Data Exchange (ETDEWEB)

    Cahyadi, Romy; Jo Min, K. [College of Engineering, Ames, IA (United States); Chunghsiao Wang [LG and E Energy Corp., Louisville, KY (United States); Abi-Samra, Nick [Electric Power Research Inst., Palo Alto, CA (United States)

    2003-07-01

    The electric power industry in many parts of U.S.A. is undergoing substantial regulatory and organizational changes. Such changes introduce substantial financial risk in generation planning. In order to incorporate the financial risk into the capital investment decision process of generation planning, in this paper, we develop and analyse a generation unit selection process via the capital asset pricing model (CAPM). In particular, utilizing realistic data on gas-fired, coal-fired, and wind power generation units, we show which and how concrete steps can be taken for generation planning purposes. It is hoped that the generation unit selection process developed in this paper will help utilities in the area of effective and efficient generation planning when financial risks are considered. (Author)

  2. Generation unit selection via capital asset pricing model for generation planning

    Energy Technology Data Exchange (ETDEWEB)

    Romy Cahyadi; K. Jo Min; Chung-Hsiao Wang; Nick Abi-Samra [College of Engineering, Ames, IA (USA)

    2003-11-01

    The USA's electric power industry is undergoing substantial regulatory and organizational changes. Such changes introduce substantial financial risk in generation planning. In order to incorporate the financial risk into the capital investment decision process of generation planning, this paper develops and analyses a generation unit selection process via the capital asset pricing model (CAPM). In particular, utilizing realistic data on gas-fired, coal-fired, and wind power generation units, the authors show which and how concrete steps can be taken for generation planning purposes. It is hoped that the generation unit selection process will help utilities in the area of effective and efficient generation planning when financial risks are considered. 20 refs., 14 tabs.

  3. Planning Development for a Family Planning Centre in Nursing Unit of the General Hospital of Argolida

    OpenAIRE

    Koukoufilippou J; Koinis A.

    2015-01-01

    Introduction: The family planning centres must be upgraded to a cornerstone of primary health care, and prevent, advise and protect the citizen's health while reducing hospitalization costs for hospitals. Aim: The purpose of this literature review is the family planning centre development in general hospital of Argolida that has a similar clinic. Material and Methods: Literature review was conducted of published English and Greek Articles from bibliographic databases Medline, Goog...

  4. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  5. British discretion in Dutch planning: establishing a comparative perspective for regional planning and local development in the Netherlands and the United Kingdom

    NARCIS (Netherlands)

    Janssen-Jansen, L.B.; Woltjer, J.

    2010-01-01

    Regional planning and development is continuing to take an important role in planning agendas throughout Europe. In the United Kingdom (UK), the planning system has been reformed during the last decades, marking a noticeable shift from a development-led towards a more plan-led system. In the

  6. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  7. Australian methodology for the estimation of greenhouse gas emissions and sinks: Agriculture: Workbook for livestock: Workbook 6.0

    Energy Technology Data Exchange (ETDEWEB)

    Bureau of Resource Sciences, Canberra, ACT (Australia)

    1994-12-31

    This workbook details a methodology for estimating methane emissions from Australian livestock. The workbook is designed to be consistent with international guidelines and takes into account special Australian conditions. While regarded as a significant source of anthropogenic methane emissions, it is also acknowledged in this document that livestock do not provide sinks for methane or any other greenhouse gas. Methane can originate from both fermentation processes in the digestive tracts of all livestock and from manure under certain management conditions. Methane emissions were estimated from beef cattle, dairy cattle, sheep, pigs, poultry, goats, horses, deer, buffalo, camels, emus and ostriches, alpacas and donkeys and mules. Two methodologies were used to estimate emissions. One is the standard Intergovernmental Panel on Climate Change (IPCC) Tier 1 methodology that is needed to provide inter-country comparisons of emissions. The other has been developed by the Inventory Methodology Working Group. It represents the best current Australian method for estimating greenhouse gas emissions from Australian livestock. (author). 6 tabs., 22 refs.

  8. Comparison of monitor units calculated by radiotherapy treatment planning system and an independent monitor unit verification software.

    Science.gov (United States)

    Sellakumar, P; Arun, C; Sanjay, S S; Ramesh, S B

    2011-01-01

    In radiation therapy, the monitor units (MU) needed to deliver a treatment plan are calculated by treatment planning systems (TPS). The essential part of quality assurance is to verify the MU with independent monitor unit calculation to correct any potential errors prior to the start of treatment. In this study, we have compared the MU calculated by TPS and by independent MU verification software. The MU verification software was commissioned and tested for the data integrity to ensure that the correct beam data was considered for MU calculations. The accuracy of the calculations was tested by creating a series of test plans and comparing them with ion chamber measurements. The results show that there is good agreement between the two. The MU difference (MUdiff) between the monitor unit calculations of TPS and independent MU verification system was calculated for 623 fields from 245 patients and was analyzed by treatment site for head & neck, thorax, breast, abdomen and pelvis. The mean MUdiff of -0.838% with a standard deviation of 3.04% was observed for all 623 fields. The site specific standard deviation of MUdiff was as follows: abdomen and pelvis (<1.75%), head & neck (2.5%), thorax (2.32%) and breast (6.01%). The disparities were analyzed and different correction methods were used to reduce the disparity. © 2010 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  9. Refinery siting workbook: appendices A and B

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    The objective of this effort is to develop and provide basic refinery-related information for use by state and local government officials as a basis for establishing responsible refinery siting requirements and policies consistent with the federal clean air and water standards and socio-economic concerns. The report will be organized into two volumes. The main text comprises the basic topics of physical concerns, regulatory requirements, and permitting activities, while the second volume includes the detailed appendix materials such as the applicable laws, and the necessary permits, as available and a glossary of pertinent terms. As a means to this objective, three refinery sizes, 200,000, 100,000 and 30,000 barrels per day crude charge will be discussed in technical terms. Process unit configuration will be presented which will maximize either gasoline or heating oil production with either sweet or sour crude oil feedstocks. The major issues affecting the socio-economic impact of siting the refinery in a given locale will be presented. These data will review the factors affecting the human environment and the issues that must be addressed to assess the impact that a refinery will have on a community. The key federal registrations which impact upon a refinery siting decision shall be reviewed. Summaries of these regulations and a simplified decision diagram for the air and water acts shall be presented to assist both government and refinery officials in understanding the scope of regulatory impact. All pertinent procedures required for refinery permitting shall be reviewed under the generalized headings of air, water, health and safety, land use, and miscellaneous permits. This categorization at the federal, state and local levels of government shall be used as a basis for establishing degrees of emphasis.

  10. Transuranic Storage Area (TSA)-2 container storage unit RCRA closure plan

    International Nuclear Information System (INIS)

    Lodman, D.W.; Spry, M.J.; Nolte, E.P.; Barry, G.A.

    1992-11-01

    This document describes the proposed plans for closure of the Transuranic Storage Area (TSA)-2 container storage unit at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. The location, size, capacity, history, and current status of the unit are described. Future plans for the unit include incorporating the earthen-covered portion of the TSA-2 pad into a TSA retrieval enclosure along with the TSA-1 and TSAR pads, and closure of the portion of the TSA-2 pad under the Air Support Weather Shield (ASWS-2). This plan addresses closure of the ASWS-2 by decontaminating structures and equipment that may have contacted the waste. Sufficient sampling and documentation of all closure activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  11. 40 CFR 60.1555 - Are any small municipal waste combustion units exempt from my State plan?

    Science.gov (United States)

    2010-07-01

    ... qualifies for the exemption. (d) Municipal waste combustion units that combust only tires. Units are exempt... single-item waste stream of tires and no other municipal waste (the unit can co-fire coal, fuel oil.../rubber recycling units. Units are exempt from your State plan if four requirements are met: (1) The...

  12. Talking about Complementary and Alternative Medicine with your Health Care Provider: A workbook and tips

    Science.gov (United States)

    A workbook to help patients and doctors talk about the use of complementary and alternative medicine(CAM) during and after cancer care. Worksheets, tips, and resources are provided for patients and doctors to help track CAM use.

  13. Talking about Complementary and Alternative Medicine with Health Care Providers: A Workbook and Tips

    Science.gov (United States)

    A workbook to help patients and doctors talk about the use of complementary and alternative medicine(CAM) during and after cancer care. Worksheets, tips, and resources are provided for patients and doctors to help track CAM use.

  14. Talking about Complementary and Alternative Medicine with Health Care Provider: A Workbook and Tips

    Science.gov (United States)

    A workbook to help patients and doctors talk about the use of complementary and alternative medicine(CAM) during and after cancer care. Worksheets, tips, and resources are provided for patients and doctors to help track CAM use.

  15. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  16. Community-level Language Planning for Chinese Heritage Language Maintenance in the United States

    Directory of Open Access Journals (Sweden)

    An Chung Cheng

    2012-08-01

    Full Text Available This paper investigates the development of Chinese heritage language in the United States from the perspective of language policy and planning. The case study examines the Chinese heritage language maintenance through community-based Chinese schools (CHS, and CHS’s relationships with Chinese American community, as well as governments and non-government organizations in China, Taiwan, and the United States. The paper starts with a theoretical discussion on the definition of language policy and planning, and then describes the history and heritage language education of Chinese Americans in the United States. The paper also presents micro-level planning activities initiated by CHSs in the Chinese American community and non-government organizations. Special focus is placed on the interaction between non-government organizations in the US and governmental bodies in Taiwan and mainland China and in the United States. This paper suggests that micro planning of heritage language maintenance is beneficial when initiated in the community, but it can only be developed and sustained within the wider scope of macro-level planning from governments

  17. Unit-Specific Contingency Plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-04-01

    This document is a supplement to DOE/RL-93-75, 'Hanford Contingency Plan.' It provides the unit-specific information needed to fully comply with the Washington Administrative Code. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins were four concrete internal surfaces, which contained radiologically and hazardous contaminated waste. The 183-H Basin area is a final status treatment, storage, and disposal unit undergoing Resource Conservation and Recovery Act modified post- closure care

  18. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  19. Planning responds to gender violence: evidence from Spain, Mexico and the United States.

    Science.gov (United States)

    Sweet, Elizabeth L; Escalante, Sara Ortiz

    2010-01-01

    Urban planning has been largely ineffective in addressing urban violence and particularly slow in responding to gender violence. This paper explores the public and private divide, structural inequalities, and issues of ethnicity and citizenship, in terms of their planning implications for gender violence. Drawing on evidence from Spain, Mexico and the United States, it examines how economic and social planning and gender violence intertwine. The three case studies demonstrate that the challenge is not only to break constructed structural inequalities and divisions between public and private spheres, but also to promote changes in the working models of institutions and organisations.

  20. Development and Application of a Low Impact Development (LID-Based District Unit Planning Model

    Directory of Open Access Journals (Sweden)

    Cheol Hee Son

    2017-01-01

    Full Text Available The purpose of this study was to develop a low impact development-based district unit planning (LID-DP model and to verify the model by applying it to a test site. To develop the model, we identified various barriers to the urban planning process and examined the advantages of various LID-related techniques to determine where in the urban development process LID would provide the greatest benefit. The resulting model provides (1 a set of district unit planning processes that consider LID standards and (2 a set of evaluation methods that measure the benefits of the LID-DP model over standard urban development practices. The developed LID-DP process is composed of status analysis, comprehensive analysis, basic plan, and sectoral plans. To determine whether the LID-DP model met the proposed LID targets, we applied the model to a test site in Cheongju City, Chungcheongbuk-do Province, Republic of Korea. The test simulation showed that the LID-DP plan reduced nonpoint source pollutants (total nitrogen, 113%; total phosphorous, 193%; and biological oxygen demand, 199%; reduced rainfall runoff (infiltration volume, 102%; surface runoff, 101%; and improved the conservation rate of the natural environment area (132%. The successful application of this model also lent support for the greater importance of non-structural techniques over structural techniques in urban planning when taking ecological factors into account.

  1. Incorporating energy efficiency into electric power transmission planning: A western United States case study

    International Nuclear Information System (INIS)

    Barbose, Galen L.; Sanstad, Alan H.; Goldman, Charles A.

    2014-01-01

    Driven by system reliability goals and the need to integrate significantly increased renewable power generation, long-range, bulk-power transmission planning processes in the United States are undergoing major changes. At the same time, energy efficiency is an increasing share of the electricity resource mix in many regions, and has become a centerpiece of many utility resource plans and state policies as a means of meeting electricity demand, complementing supply-side sources, and reducing carbon dioxide emissions from the electric power system. The paper describes an innovative project in the western United States to explicitly incorporate end-use efficiency into load forecasts – projections of electricity consumption and demand – that are a critical input into transmission planning and transmission planning studies. Institutional and regulatory background and context are reviewed, along with a detailed discussion of data sources and analytical procedures used to integrate efficiency into load forecasts. The analysis is intended as a practical example to illustrate the kinds of technical and institutional issues that must be addressed in order to incorporate energy efficiency into regional transmission planning activities. - Highlights: • Incorporating energy efficiency into electric power transmission planning is an emergent analytical and policy priority. • A new methodology for this purpose was developed and applied in the western U.S. transmission system. • Efficiency scenarios were created and incorporated into multiple load forecasts. • Aggressive deployment of efficiency policies and programs can significantly reduce projected load. • The approach is broadly applicable in long-range transmission planning

  2. Transuranic Storage Area (TSA)-3 container storage unit RCRA closure plan

    International Nuclear Information System (INIS)

    Barry, G.A.; Lodman, D.L.; Spry, M.J.; Poor, K.J.

    1992-11-01

    This document describes the proposed plan for closure of the Transuranic Storage Area (TSA)-3 container storage unit at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. The location, size, capacity, history, and current status of the unit are described. The unit will be closed by decontaminating structures and equipment that may have contacted waste. Sufficient sampling and documentation of all activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  3. Planned home birth in the United States and professionalism: a critical assessment.

    Science.gov (United States)

    Chervenak, Frank A; McCullough, Laurence B; Grünebaum, Amos; Arabin, Birgit; Levene, Malcolm I; Brent, Robert L

    2013-01-01

    Planned home birth has been considered by some to be consistent with professional responsibility in patient care. This article critically assesses the ethical and scientific justification for this view and shows it to be unjustified. We critically assess recent statements by professional associations of obstetricians, one that sanctions and one that endorses planned home birth. We base our critical appraisal on the professional responsibility model of obstetric ethics, which is based on the ethical concept of medicine from the Scottish and English Enlightenments of the 18th century. Our critical assessment supports the following conclusions. Because of its significantly increased, preventable perinatal risks, planned home birth in the United States is not clinically or ethically benign. Attending planned home birth, no matter one's training or experience, is not acting in a professional capacity, because this role preventably results in clinically unnecessary and therefore clinically unacceptable perinatal risk. It is therefore not consistent with the ethical concept of medicine as a profession for any attendant to planned home birth to represent himself or herself as a "professional." Obstetric healthcare associations should neither sanction nor endorse planned home birth. Instead, these associations should recommend against planned home birth. Obstetric healthcare professionals should respond to expressions of interest in planned home birth by pregnant women by informing them that it incurs significantly increased, preventable perinatal risks, by recommending strongly against planned home birth, and by recommending strongly for planned hospital birth. Obstetric healthcare professionals should routinely provide excellent obstetric care to all women transferred to the hospital from a planned home birth.The professional responsibility model of obstetric ethics requires obstetricians to address and remedy legitimate dissatisfaction with some hospital settings and

  4. Application for verification of monitor units of the treatment planning system

    International Nuclear Information System (INIS)

    Suero Rodrigo, M. A.; Marques Fraguela, E.

    2011-01-01

    Current estimates algorithms achieve acceptable degree of accuracy. However, operate on the basis of un intuitive models. It is therefore necessary to verify the calculation of monitor units of the treatment planning system (TPS) with those obtained by other independent formalisms. To this end, we have developed an application based on factorization formalism that automates the calculation of dose.

  5. An extended theory of planned behavior to predict consumers' willingness to buy mobile slaughter unit meat

    NARCIS (Netherlands)

    Hoeksma, Djura L.; Gerritzen, Marien A.; Lokhorst, Anne Marike; Poortvliet, Marijn

    2017-01-01

    The current study investigated the determinants of consumers' intention to purchase meat from mobile slaughter units (MSU). The theory of planned behavior (TPB) and the value belief norm theory (VBN) were used as conceptual lenses to guide this investigation. We conducted a survey among 329

  6. Checks for quality control of wedge dynamics in treatment units and the planning system

    International Nuclear Information System (INIS)

    Mateos Salvador, P.; Rodriguez Lopez, B.; Font Gelabert, J.; Hernandez Rodriguez, J.; Arino Gil, A.

    2013-01-01

    The objective of this study is to verify the implementation of enhanced dynamic wedge (EDW) vary in the Eclipse planning system and the experimental determination of the parameters that define the dosimetry characteristics of enhanced dynamic wedge of our treatment units. (Author)

  7. "The State of Chihuahua", Lesson Plan for "Cultural Unit: Focus on Mexico."

    Science.gov (United States)

    Llewellyn, Marianne

    This lesson plan was designed for students in Montana schools. The objectives for this culture unit are having: (1) students recognize the similarities between their home stat of Montana and the Mexican state of Chihuahua; (2) students learn about features unique to Chihuahua; and (3) students create an advertising brochure marketing Chihuahua to…

  8. Nuclear reactors built, being built, or planned in the United States

    International Nuclear Information System (INIS)

    1984-08-01

    This booklet contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of Apr. 30, 1984, which are capable of sustaining a nuclear chain reaction. Information is presented in five parts, each of which is categorized by primary function or purpose: civilian, military, production, export, and critical assembly facilities

  9. Nuclear reactors built, being built, or planned in the United States

    International Nuclear Information System (INIS)

    Carter, E.P.

    1985-09-01

    This publication contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of March 1985, which are capable of sustaining a nuclear chain reaction. Information is presented in five parts, each of which is categorized by primary function or purpose: civilian, production, military, export, and critical assembly facilities

  10. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  11. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2006-01-01

    Corrective Action Unit (CAU) 543, Liquid Disposal Units, is listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. CAU 543 consists of seven Corrective Action Sites (CASs) located in Areas 6 and 15 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven CASs: (sm b ullet) CAS 06-07-01, Decon Pad (sm b ullet) CAS 15-01-03, Aboveground Storage Tank (sm b ullet) CAS 15-04-01, Septic Tank (sm b ullet) CAS 15-05-01, Leachfield (sm b ullet) CAS 15-08-01, Liquid Manure Tank (sm b ullet) CAS 15-23-01, Underground Radioactive Material Area (sm b ullet) CAS 15-23-03, Contaminated Sump, Piping From January 24, 2005 through April 14, 2005, CAU 543 site characterization activities were conducted, and are reported in Appendix A of the CAU 543 Corrective Action Decision Document (CADD) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2005). The recommended corrective action as stated in the approved CADD is No Further Action for five of the CAU 543 CASs, and Closure In Place for the remaining two CASs

  12. Work plan for the retrieval of contaminated soil from the 116-F-4 soil storage unit

    International Nuclear Information System (INIS)

    Ludowise, J.D.

    1996-07-01

    The 116-F-4 pluto crib was excavated in 1993 as a treatability test to study field radionuclide analysis and dust control techniques. Approximately 410 m3 (540 yd3) of contaminated soil was removed from the crib and stored in a modular soil storage unit in the southwest corner of the 105-F exclusion area. In 1996, the waste will be retrieved from the storage unit and the storage unit will be dismantled. The waste and dismantled storage unit will be loaded and transported to the Environmental Restoration Disposal Facility. The purpose of this work plan is to provide guidance for retrieval and disposal of the 116-F-4 pluto crib contaminated soil and associated storage unit

  13. Unit-specific contingency plan for the 183-H solar evaporation basins. Revision 1

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1996-03-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H solar evaporation basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  14. Unit-specific contingency plan for the 183-H Solar Evaporation Basins. Revision 2

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1997-01-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  15. Selected perinatal outcomes associated with planned home births in the United States.

    Science.gov (United States)

    Cheng, Yvonne W; Snowden, Jonathan M; King, Tekoa L; Caughey, Aaron B

    2013-10-01

    More women are planning home birth in the United States, although safety remains unclear. We examined outcomes that were associated with planned home compared with hospital births. We conducted a retrospective cohort study of term singleton live births in 2008 in the United States. Deliveries were categorized by location: hospitals or intended home births. Neonatal outcomes were compared with the use of the χ(2) test and multivariable logistic regression. There were 2,081,753 births that met the study criteria. Of these, 12,039 births (0.58%) were planned home births. More planned home births had 5-minute Apgar score births (0.24%; adjusted odds ratio, 1.87; 95% confidence interval, 1.36-2.58) and neonatal seizure (0.06% vs 0.02%, respectively; adjusted odds ratio, 3.08; 95% confidence interval, 1.44-6.58). Women with planned home birth had fewer interventions, including operative vaginal delivery and labor induction/augmentation. Planned home births were associated with increased neonatal complications but fewer obstetric interventions. The trade-off between maternal preferences and neonatal outcomes should be weighed thoughtfully. Copyright © 2013 Mosby, Inc. All rights reserved.

  16. Skin self-examination education for early detection of melanoma: a randomized controlled trial of Internet, workbook, and in-person interventions.

    Science.gov (United States)

    Robinson, June K; Gaber, Rikki; Hultgren, Brittney; Eilers, Steven; Blatt, Hanz; Stapleton, Jerod; Mallett, Kimberly; Turrisi, Rob; Duffecy, Jenna; Begale, Mark; Martini, Mary; Bilimoria, Karl; Wayne, Jeffrey

    2014-01-13

    Early detection of melanoma improves survival. Since many melanoma patients and their spouses seek the care of a physician after discovering their melanoma, an ongoing study will determine the efficacy of teaching at-risk melanoma patients and their skin check partner how to conduct skin self-examinations (SSEs). Internet-based health behavior interventions have proven efficacious in creating behavior change in patients to better prevent, detect, or cope with their health issues. The efficacy of electronic interactive SSE educational intervention provided on a tablet device has not previously been determined. The electronic interactive educational intervention was created to develop a scalable, effective intervention to enhance performance and accuracy of SSE among those at-risk to develop melanoma. The intervention in the office was conducted using one of the following three methods: (1) in-person through a facilitator, (2) with a paper workbook, or (3) with a tablet device used in the clinical office. Differences related to method of delivery were elucidated by having the melanoma patient and their skin check partner provide a self-report of their confidence in performing SSE and take a knowledge-based test immediately after receiving the intervention. The three interventions used 9 of the 26 behavioral change techniques defined by Abraham and Michie to promote planning of monthly SSE, encourage performing SSE, and reinforce self-efficacy by praising correct responses to knowledge-based decision making and offering helpful suggestions to improve performance. In creating the electronic interactive SSE educational intervention, the educational content was taken directly from both the scripted in-person presentation delivered with Microsoft PowerPoint by a trained facilitator and the paper workbook training arms of the study. Enrollment totaled 500 pairs (melanoma patient and their SSE partner) with randomization of 165 pairs to the in-person, 165 pairs to the

  17. Being safe: making the decision to have a planned home birth in the United States.

    Science.gov (United States)

    Lothian, Judith A

    2013-01-01

    Although there is evidence that supports the safety of planned home birth for healthy women, less than 1 percent of women in the United States choose to have their baby at home. An ethnographic study of the experience of planned home birth provided rich descriptions of women's experiences planning, preparing for, and having a home birth.This article describes findings related to how women make the decision to have a planned home birth. For these women, being safe emerged as central in making the decision. For them, being safe included four factors: avoiding technological birth interventions, knowing the midwife and the midwife knowing them, feeling comfortable and protected at home, and knowing that backup hospital medical care was accessible if needed.

  18. [Quality planning of Family Health Units using Quality Function Deployment (QFD)].

    Science.gov (United States)

    Volpato, Luciana Fernandes; Meneghim, Marcelo de Castro; Pereira, Antonio Carlos; Ambrosano, Gláucia Maria Bovi

    2010-08-01

    Quality is an indispensible requirement in the health field, and its pursuit is necessary in order to meet demands by a population that is aware of its rights, as part of the essence of good work relations, and to decrease technological costs. Quality thus involves all parties to the process (users and professionals), and is no longer merely an attribute of the health service. This study aimed to verify the possibility of quality planning in the Family Health Units, using Quality Function Deployment (QFD). QFD plans quality according to user satisfaction, involving staff professionals and identifying new approaches to improve work processes. Development of the array, called the House of Quality, is this method's most important characteristics. The results show a similarity between the quality demanded by users and the quality planned by professionals. The current study showed that QFD is an efficient tool for quality planning in public health services.

  19. A multi-period, multi-regional generation expansion planning model incorporating unit commitment constraints

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Georgiadis, Michael C.

    2015-01-01

    Highlights: • A short-term structured investment planning model has been developed. • Unit commitment problem is incorporated into the long-term planning horizon. • Inherent intermittency of renewables is modelled in a comprehensive way. • The impact of CO_2 emission pricing in long-term investment decisions is quantified. • The evolution of system’s marginal price is evaluated for all the planning horizon. - Abstract: This work presents a generic mixed integer linear programming (MILP) model that integrates the unit commitment problem (UCP), i.e., daily energy planning with the long-term generation expansion planning (GEP) framework. Typical daily constraints at an hourly level such as start-up and shut-down related decisions (start-up type, minimum up and down time, synchronization, soak and desynchronization time constraints), ramping limits, system reserve requirements are combined with representative yearly constraints such as power capacity additions, power generation bounds of each unit, peak reserve requirements, and energy policy issues (renewables penetration limits, CO_2 emissions cap and pricing). For modelling purposes, a representative day (24 h) of each month over a number of years has been employed in order to determine the optimal capacity additions, electricity market clearing prices, and daily operational planning of the studied power system. The model has been tested on an illustrative case study of the Greek power system. Our approach aims to provide useful insight into strategic and challenging decisions to be determined by investors and/or policy makers at a national and/or regional level by providing the optimal energy roadmap under real operating and design constraints.

  20. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit. decisions for this operable unit

  1. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449 ampersand D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit

  2. Man-in-the-loop validation plan for the Millstone Unit 3 SPDS

    International Nuclear Information System (INIS)

    Blanch, P.M.; Wilkinson, C.D.

    1985-01-01

    This paper describes the man-in-the-loop validation plan for the Millstone Point Unit 3 (MP3) Safety Parameter Display System (SPDS). MP3 is a pressurized water reactor scheduled to load fuel November, 1985. The SPDS is being implemented as part of plant construction. This paper provides an overview of the validation process. Detailed validation procedures, scenarios, and evaluation forms will be incorporated into the validation plan to produce the detailed validation program. The program document will provide all of the new detailed instructions necessary to perform the man-in-the-loop validation

  3. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  4. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  5. 77 FR 31026 - Use of Computer Simulation of the United States Blood Supply in Support of Planning for Emergency...

    Science.gov (United States)

    2012-05-24

    ...] Use of Computer Simulation of the United States Blood Supply in Support of Planning for Emergency... entitled: ``Use of Computer Simulation of the United States Blood Supply in Support of Planning for... and panel discussions with experts from academia, regulated industry, government, and other...

  6. Independent verification of monitor unit calculation for radiation treatment planning system.

    Science.gov (United States)

    Chen, Li; Chen, Li-Xin; Huang, Shao-Min; Sun, Wen-Zhao; Sun, Hong-Qiang; Deng, Xiao-Wu

    2010-02-01

    To ensure the accuracy of dose calculation for radiation treatment plans is an important part of quality assurance (QA) procedures for radiotherapy. This study evaluated the Monitor Units (MU) calculation accuracy of a third-party QA software and a 3-dimensional treatment planning system (3D TPS), to investigate the feasibility and reliability of independent verification for radiation treatment planning. Test plans in a homogenous phantom were designed with 3-D TPS, according to the International Atomic Energy Agency (IAEA) Technical Report No. 430, including open, blocked, wedge, and multileaf collimator (MLC) fields. Test plans were delivered and measured in the phantom. The delivered doses were input to the QA software and the independent calculated MUs were compared with delivery. All test plans were verified with independent calculation and phantom measurements separately, and the differences of the two kinds of verification were then compared. The deviation of the independent calculation to the measurements was (0.1 +/- 0.9)%, the biggest difference fell onto the plans that used block and wedge fields (2.0%). The mean MU difference between the TPS and the QA software was (0.6 +/- 1.0)%, ranging from -0.8% to 2.8%. The deviation in dose of the TPS calculation compared to the measurements was (-0.2 +/- 1.7)%, ranging from -3.9% to 2.9%. MU accuracy of the third-party QA software is clinically acceptable. Similar results were achieved with the independent calculations and the phantom measurements for all test plans. The tested independent calculation software can be used as an efficient tool for TPS plan verification.

  7. Engineering evaluation/conceptual plan for the 200-UP-1 groundwater operable unit interim remedial measure

    International Nuclear Information System (INIS)

    Myers, D.A.; Swanson, L.C.; Weeks, R.S.; Giacinto, J.; Gustafson, F.W.; Ford, B.H.; Wittreich, C.; Parnell, S.; Green, J.

    1995-04-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (ERM) to address a uranium and technetium-99 groundwater plume and an associated nitrate contamination plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need and potentially achievable objectives and goals for an IRM and evaluates alternatives to contain elevated concentrations of uranium, technetium-99, nitrate, and carbon tetrachloride and to obtain information necessary to develop final remedial actions for the operable unit

  8. Exercise: Benefits for Body and Mind. Student Workbook. Health Promotion for Adult Literacy Students: An Empowering Approach.

    Science.gov (United States)

    Hudson River Center for Program Development, Glenmont, NY.

    This workbook was developed to help adult literacy students learn about exercise and physical fitness. It contains information sheets and student worksheets, coordinated with an audiotape that is available. Some of the topics covered in the workbook are the following: benefits of exercise; stress; aerobic versus anaerobic exercise; exercise…

  9. Planning for closures of hazardous waste land disposal units at the Oak Ridge Y-12 plant

    International Nuclear Information System (INIS)

    Welch, S.H.; Kelly, B.A.; DeLozier, M.F.P.; Manrod, W.E.

    1988-01-01

    Eight hazardous waste land disposal units at the Oak Ridge Y-12 Plant are being closed in accordance with the Resource Conservation and Recovery Act (RCRA) under an integrated multi-year program. The units, some of which date back to the early 1950s and include five surface impoundments, two landfills and a land treatment unit, have been used for the management of a variety of types of hazardous wastes. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. The units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. Closure of all eight units must be initiated by November 8, 1988. Funding for the eight closures is being provided by a new Department of Energy budget category, the environmental Restoration Budget Category (ERBC), which is intended to allow for a more rapid response to environmental problems and regulatory requirements. A major project, Closure and Post-Closure Activities (CAPCA) has been identified for ERBC funding to close the land disposal units in accordance with RCRA requirements. Establishing the project scope has required the development of a detailed set of assumptions and a confirmation program for each assumption. Other significant activities in the CAPCA project include risk assessments and the preparation of an integrated project schedule

  10. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  11. Planner's energy workbook: a manual for exploring relationships between land use and energy utilization

    Energy Technology Data Exchange (ETDEWEB)

    Carroll, T.O.; Nathans, R.; Palmedo, P.F.; Stern, R.

    1977-06-01

    It has been clear that the magnitude and character of a region's energy requirements are intimately related to the spatial configuration and mix of land use activities. To the degree to which they can shape the future configurations of residential, commercial, industrial, and transportation activities, local governments and their planners must give serious consideration to the energy implications of those configurations in the light of future social goals and requirements. This Planner's Energy Workbook describes a set of procedures that can be used to carry out community and regional energy analyses. The choice of land use activity parameters and their relation to energy use characteristics are associated with the normal planning concepts of land use density, type of residential development, commercial floorspace, industrial sales and employment, and shopping and work trip lengths. At the same time these energy related intensity coefficients are expressed in a form that permits the analysis of short-term conservation strategies such as the retrofit of insulation and the introduction of new technologies such as solar energy. An integrating framework is provided to construct total community or area energy consumption profiles and future needs; to examine compatibility between area requirements and the energy supply-distribution system serving the area; and to evaluate the implications for energy use of the physical configuration of urban, suburban and rural areas. Two cases illustrate the application of this Workbook. The Long Island area is representative of major suburban regions throughout the U.S. which have undergone major growth and development. A community redevelopment design in Tuscon, Arizona is typical of rapid and major land use development within the environs of an existing city.

  12. Proposed plan for interim remedial measures at the 100-KR-1 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites that include contaminated soils and structures at the 100-KR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this Operable Unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that pose potential threats to human health and the environment. This proposed plan is being issued by the US Environmental Protection Agency (EPA), the lead regulatory agency; the Washington State Department of Ecology (Ecology), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. The EPA, Ecology, and the DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Law.'' This proposed plan is intended to be a fact sheet for public review which briefly describes the remedial alternatives analyzed, identifies a preferred alternative, and summarizes the information relied upon to recommend the preferred alternative

  13. Clinical treatment planning optimization by Powell's method for gamma unit treatment system

    International Nuclear Information System (INIS)

    Yan Yulong; Shu Huazhong; Bao Xudong; Luo Limin; Bai Yi

    1997-01-01

    Purpose: This article presents a new optimization method for stereotactic radiosurgery treatment planning for gamma unit treatment system. Methods and Materials: The gamma unit has been utilized in stereotactic radiosurgery for about 30 years, but the usual procedure for a physician-physicist team to design a treatment plan is a trial-and-error approach. Isodose curves are viewed on two-dimensional computed tomography (CT) or magnetic resonance (MR) image planes, which is not only time consuming but also seldom achieves the optimal treatment plan, especially when the isocenter weights are regarded. We developed a treatment-planning system on a computer workstation in which Powell's optimization method is realized. The optimization process starts with the initial parameters (the number of iso centers as well as corresponding 3D iso centers' coordinates, collimator sizes, and weight factors) roughly determined by the physician-physicist team. The objective function can be changed to consider protection of sensitive tissues. Results: We use the plan parameters given by a well-trained physician-physicist team, or ones that the author give roughly as the initial parameters for the optimization procedure. Dosimetric results of optimization show a better high dose-volume conformation to the target volume compared to the doctor's plan. Conclusion: This method converges quickly and is not sensitive to the initial parameters. It achieves an excellent conformation of the estimated isodose curves with the contours of the target volume. If the initial parameters are varied, there will be a little difference in parameters' configuration, but the dosimetric results proved almost to be the same

  14. Corrective Action Investigation Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada: Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-05-03

    The general purpose of this Corrective Action Investigation Plan is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective action alternatives (CAAs) for Corrective Action Unit (CAU) 543: Liquid Disposal Units, Nevada Test Site (NTS), Nevada. Located in Areas 6 and 15 on the NTS, CAU 543 is comprised of a total of seven corrective action sites (CASs), one in Area 6 and six in Area 15. The CAS in Area 6 consists of a Decontamination Facility and its components which are associated with decontamination of equipment, vehicles, and materials related to nuclear testing. The six CASs in Area 15 are located at the U.S. Environmental Protection Agency Farm and are related to waste disposal activities at the farm. Sources of possible contamination at Area 6 include potentially contaminated process waste effluent discharged through a process waste system, a sanitary waste stream generated within buildings of the Decon Facility, and radiologically contaminated materials stored within a portion of the facility yard. At Area 15, sources of potential contamination are associated with the dairy operations and the animal tests and experiments involving radionuclide uptake. Identified contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, petroleum hydrocarbons, pesticides, herbicides, polychlorinated biphenyls, metals, and radionuclides. Three corrective action closure alternatives - No Further Action, Close in Place, or Clean Closure - will be recommended for CAU 543 based on an evaluation of all the data quality objective-related data. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of CAAs that will be presented in the Corrective Action Decision Document.

  15. Plutonium Finishing Plant (PFP) Treatment and Storage Unit Waste Analysis Plan

    International Nuclear Information System (INIS)

    PRIGNANO, A.L.

    2000-01-01

    The purpose of this waste analysis plan (WAP) is to document waste analysis activities associated with the Plutonium Finishing Plant Treatment and Storage Unit (PFP Treatment and Storage Unit) to comply with Washington Administrative Code (WAC) 173-303-300(1), (2), (4)(a) and (5). The PFP Treatment and Storage Unit is an interim status container management unit for plutonium bearing mixed waste radiologically managed as transuranic (TRU) waste. TRU mixed (TRUM) waste managed at the PFP Treatment and Storage Unit is destined for the Waste Isolation Pilot Plant (WIPP) and therefore is not subject to land disposal restrictions [WAC 173-303-140 and 40 CFR 268]. The PFP Treatment and Storage Unit is located in the 200 West Area of the Hanford Facility, Richland Washington (Figure 1). Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge

  16. Functional planning units for the management of an endangered Brazilian titi monkey.

    Science.gov (United States)

    Gouveia, Sidney F; Souza-Alves, João Pedro; de Souza, Bruno B; Beltrão-Mendes, Raone; Jerusalinsky, Leandro; Ferrari, Stephen F

    2017-05-01

    Conservation practices in the tropics often rely on the data available for a few, better-known species and the adoption of an appropriate spatial scale. By defining a set of landscape units that account for critical aspects of the focal species, the information available on these conservation targets can support regional conservation policies. Here, we define and classify adjacent landscapes, termed planning units, to orientate management decisions within and among these landscapes, which are occupied by an endangered flagship primate species (Coimbra-Filho's titi monkey, Callicebus coimbrai) from eastern Brazil. We use landscape boundaries (highways and river systems), and a high-resolution map of forest remnants to identify continuous and manageable landscapes. We employed functional landscape metrics based on the species' dispersal ability and home range size to characterize and classify these landscapes. We classified planning units by scoring them according to a suite of selected metrics through a Principal Component Analysis. We propose 31 planning units, containing one to six C. coimbrai populations, most with low values of habitat availability, functional connectivity and carrying capacity, and a high degree of degradation. Due to this poor landscape configuration, basic management practices are recommendable. However, additional aspects of the landscapes and the populations they contain (e.g., matrix type and genetic variability) should improve the scheme, which will require a closer integration of research aims with socio-political strategies. Even so, our scheme should prove useful for the combination of information on conservation targets (i.e., focal species) with management strategies on an administrative scale. © 2017 Wiley Periodicals, Inc.

  17. Business planning for scientists and engineers[3rd edition]; TOPICAL

    International Nuclear Information System (INIS)

    Servo, Jenny C.

    1999-01-01

    This combination text/workbook is intended for use by scientists or engineers actively engaged in developing a product or technology to commercial production. The 'how' of planning is a central theme with special emphasis on development of operational plans and strategic thinking

  18. Plutonium Finishing Plant Treatment and Storage Unit Dangerous Waste Training Plan

    International Nuclear Information System (INIS)

    ENTROP, G.E.

    2000-01-01

    The training program for personnel performing waste management duties pertaining to the Plutonium Finishing Plant (PFP) Treatment and Storage Unit is governed by the general requirements established in the Plutonium Finishing Plant Dangerous Waste Training Plan (PFP DWTP). The PFP Treatment and Storage Unit DWTP presented below incorporates all of the components of the PFP DWTP by reference. The discussion presented in this document identifies aspects of the training program specific to the PFP Treatment and Storage Unit. The training program includes specifications for personnel instruction through both classroom and on-the-job training. Training is developed specific to waste management duties. Hanford Facility personnel directly involved with the PFP Treatment and Storage Unit will receive training to container management practices, spill response, and emergency response. These will include, for example, training in the cementation process and training pertaining to applicable elements of WAC 173-303-330(1)(d). Applicable elements from WAC 173-303-330(1)(d) for the PFP Treatment and Storage Unit include: procedures for inspecting, repairing, and replacing facility emergency and monitoring equipment; communications and alarm systems; response to fires or explosions; and shutdown of operations

  19. [Application and evalauation of care plan for patients admitted to Intensive Care Units].

    Science.gov (United States)

    Cuzco Cabellos, C; Guasch Pomés, N

    2015-01-01

    Assess whether the use of the nursing care plans improves outcomes of nursing care to patients admitted to the intensive care unit (ICU). The study was conducted in a University Hospital of Barcelona in Spain, using a pre- and post-study design. A total of 61 patient records were analysed in the pre-intervention group. A care plan was applied to 55 patients in the post-intervention group. Specific quality indicators in a medical intensive care unit to assess the clinical practice of nursing were used. Fisher's exact test was used to compare the degree of association between quality indicators in the two groups. A total of 116 records of 121 patients were evaluated: 61 pre-intervention and 55 post-intervention. Fisher test: The filling of nursing records, p=.0003. Checking cardiorespiratory arrest equipment, p <.001. Central vascular catheter related bacteraemia (B-CVC) p=.622. Ventilator associated pneumonia (VAP) p=.1000. Elevation of the head of the bed more than 30° p=.049, and the pain management in non-sedated patients p=.082. The implementation of nursing care plans in patients admitted to the intensive care area may contribute to improvement in the outcomes of nursing care. Copyright © 2015 Elsevier España, S.L.U. y SEEIUC. All rights reserved.

  20. The segment as the minimal planning unit in speech production and reading aloud: evidence and implications.

    Science.gov (United States)

    Kawamoto, Alan H; Liu, Qiang; Kello, Christopher T

    2015-01-01

    Speech production and reading aloud studies have much in common, especially the last stages involved in producing a response. We focus on the minimal planning unit (MPU) in articulation. Although most researchers now assume that the MPU is the syllable, we argue that it is at least as small as the segment based on negative response latencies (i.e., response initiation before presentation of the complete target) and longer initial segment durations in a reading aloud task where the initial segment is primed. We also discuss why such evidence was not found in earlier studies. Next, we rebut arguments that the segment cannot be the MPU by appealing to flexible planning scope whereby planning units of different sizes can be used due to individual differences, as well as stimulus and experimental design differences. We also discuss why negative response latencies do not arise in some situations and why anticipatory coarticulation does not preclude the segment MPU. Finally, we argue that the segment MPU is also important because it provides an alternative explanation of results implicated in the serial vs. parallel processing debate.

  1. Impact of a risk management plan on Legionella contamination of dental unit water.

    Science.gov (United States)

    Leoni, Erica; Dallolio, Laura; Stagni, Francesca; Sanna, Tiziana; D'Alessandro, Giovanni; Piana, Gabriela

    2015-02-23

    The study aimed to assess the prevalence of Legionella spp. in dental unit waterlines of a dental clinic and to verify whether the microbiological parameters used as indicators of water quality were correlated with Legionella contamination. A risk management plan was subsequently implemented in the dental health care setting, in order to verify whether the adopted disinfection protocols were effective in preventing Legionella colonization. The water delivered from syringes and turbines of 63 dental units operating in a dental clinic, was monitored for counts of the heterotrophic bacteria P. aeruginosa and Legionella spp. (22 °C and 37 °C). At baseline, output water from dental units continuously treated with disinfection products was more compliant with the recommended standards than untreated and periodically treated water. However, continuous disinfection was still not able to prevent contamination by Legionella and P. aeruginosa. Legionella was isolated from 36.4%, 24.3% and 53.3% of samples from untreated, periodically and continuously treated waterlines, respectively. The standard microbiological parameters used as indicators of water quality proved to be unreliable as predictors of the presence of Legionella, whose source was identified as the tap water used to supply the dental units. The adoption of control measures, including the use of deionized water in supplying the dental unit waterlines and the application of a combined protocol of continuous and periodic disinfection, with different active products for the different devices, resulted in good control of Legionella contamination. The efficacy of the measures adopted was mainly linked to the strict adherence to the planned protocols, which placed particular stress on staff training and ongoing environmental monitoring.

  2. The General Urban Plan of Casimcea territorial administrative unit, map of natural and anthropogenic risks

    Directory of Open Access Journals (Sweden)

    Sorin BĂNICĂ

    2013-08-01

    Full Text Available The General Urban Plan represents the legal ground for any development action proposed. After endorsement and approval as required by law, GUP is act of authority of local government for the area in which it applies. The aim is to establish priorities regulations applied in land use planning and construction of structures. In terms of geographical location, the administrative territory of Casimcea, Tulcea county, falls in the central Northwest Plateau Casimcei. This is the second unit of the Central Dobrogea Plateau. Geographical location in southeastern Romania, climatic and relief conditions and anthropogenic pressure, expose the village administrative territorial unit Casimcea, permanent susceptibility to produce natural and antropogenical risks. In this context, we identified the following categories of natural and anthropogenic risks: i natural risk phenomena (earthquakes, strong winds, heavy rains, floods caused by overflowing or precipitation, erosion of river banks and torrents, gravitational processes, rain droplet erosion and surface soil erosion; and ii anthropogenic risk phenomena (overgrazing, chemicals use in agriculture, road transport infrastructure and electricity, wind turbines for electricity production, waste deposits, agro-zootechnical complexs, and human cemeteries. Extending their surface was materialized by creating a map of natural and anthropogenic risk on Casimcea territorial administrative unit, explaining the share of potentially affected areas as territorial balance

  3. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2001-01-01

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  4. A manned maneuvering unit proximity operations planning and flight guidance display and control system

    Science.gov (United States)

    Gershzohn, Gary R.; Sirko, Robert J.; Zimmerman, K.; Jones, A. D.

    1990-01-01

    This task concerns the design, development, testing, and evaluation of a new proximity operations planning and flight guidance display and control system for manned space operations. A forecast, derivative manned maneuvering unit (MMU) was identified as a candidate for the application of a color, highway-in-the-sky display format for the presentation of flight guidance information. A silicon graphics 4D/20-based simulation is being developed to design and test display formats and operations concepts. The simulation includes the following: (1) real-time color graphics generation to provide realistic, dynamic flight guidance displays and control characteristics; (2) real-time graphics generation of spacecraft trajectories; (3) MMU flight dynamics and control characteristics; (4) control algorithms for rotational and translational hand controllers; (5) orbital mechanics effects for rendezvous and chase spacecraft; (6) inclusion of appropriate navigation aids; and (7) measurement of subject performance. The flight planning system under development provides for: (1) selection of appropriate operational modes, including minimum cost, optimum cost, minimum time, and specified ETA; (2) automatic calculation of rendezvous trajectories, en route times, and fuel requirements; (3) and provisions for manual override. Man/machine function allocations in planning and en route flight segments are being evaluated. Planning and en route data are presented on one screen composed of two windows: (1) a map display presenting a view perpendicular to the orbital plane, depicting flight planning trajectory and time data attitude display presenting attitude and course data for use en route; and (2) an attitude display presenting local vertical-local horizontal attitude data superimposed on a highway-in-the-sky or flight channel representation of the flight planned course. Both display formats are presented while the MMU is en route. In addition to these displays, several original display

  5. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2000-01-01

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  6. Can we Plan. The political economy of commercial nuclear energy policy in the United States

    International Nuclear Information System (INIS)

    Campbell, J.L. Jr.

    1984-01-01

    The dissertation is an analysis of the commercial nuclear energy sector's decline in the United States. The research attempts to reconcile the debate between Weberian-institutional and Marxist political theory about the state's inability to successfully plan industrial development in advanced capitalist countries. Synthesizing these views, the central hypothesis guiding the research is that the greater the state's relative autonomy from political and economic constraints in an institutional sense, i.e., the greater its insulation from the contradictions of capitalism and democracy, the greater its planning capacity and the more successful it will be in directing industrial performance. The research examines one industrial sector, commercial nuclear energy, and draws two major comparison. First, the French and US nuclear industries are compared, since the state's relative autonomy is much greater in the former than in the latter. This comparison is developed to identify policy areas where nuclear planning has succeeded in France but failed in America. Four areas are identified: reactor standardization, waste management, reactor safety, and financing. Second, looking particularly at the US, the policy areas are compared to analyze the development of policy and its effects on the sector's performance and to determine the degree to which planning was undermined by the structural constraints characteristic of a state with low relative autonomy

  7. Sector activities and lessons learned around initial implementation of the United States national physical activity plan.

    Science.gov (United States)

    Evenson, Kelly R; Satinsky, Sara B

    2014-08-01

    National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans.

  8. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2000-05-23

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  9. EVOLUTION OF THE FOREST MANAGEMENT PHILOSOPHY IN TURKEY: A CASE STUDY OF ARTVIN PLANNING UNIT

    Directory of Open Access Journals (Sweden)

    Hacı Ahmet Yolasığmaz

    2006-04-01

    Full Text Available Forest management plans were firstly prepared and implemented in Turkey between 1963 and 1973. All forests in Turkey have been managed with timber oriented forest management philosophy; however, there have been some developments about inventory and silviculture techniques for approximately 40 years. Last decade, Turkey participated in Convention of Biological Diversity in Rio (1992 and included in both Pan – European and Near East Region Conventions. Nowadays, Turkish forest management philosophy has changed from timber management to ecosystem-based multiple-use forest planning with the principles of “sustainable forest management” criteria and indicators drafted in a few national and international agreements. Thus, Turkish forestry is underway in a restructuring process. This paper presents evolution of the traditional forest management philosophy in Turkey since 1963. This study was carried out in Artvin Planning Unit. Past two decade planning periods (managed under timber management approach was compared with current case study data used for forest multiple use management approach based on ecosystem in terms of distribution of age class, site class and change of volume and increment. In conclusion, former applications and techniques for adaptation of improvement must be analyzed and interpreted properly. Monetary resources and experts as well as legal, technique and scientific framework must be provided.

  10. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    International Nuclear Information System (INIS)

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided

  11. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  12. Sampling and Analysis Plan Update for Groundwater Monitoring 1100-EM-1 Operable Unit

    International Nuclear Information System (INIS)

    DR Newcomer

    1999-01-01

    This document updates the sampling and analysis plan (Department of Energy/Richland Operations--95-50) to reflect current groundwater monitoring at the 1100-EM-1Operable Unit. Items requiring updating included sampling and analysis protocol, quality assurance and quality control, groundwater level measurement procedure, and data management. The plan covers groundwater monitoring, as specified in the 1993 Record of Decision, during the 5-year review period from 1995 through 1999. Following the 5-year review period, groundwater-monitoring data will be reviewed by Environmental Protection Agency to evaluate the progress of natural attenuation of trichloroethylene. Monitored natural attenuation and institutional controls for groundwater use at the inactive Horn Rapids Landfill was the selected remedy specified in the Record of Decision

  13. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  14. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  15. Statement of Basis/Proposed Plan for the Gunsite 113 Access Road Unit (631-24G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1997-01-01

    The purpose of this plan is to describe the preferred remedial alternative for addressing the Gunsite 113 Access Road Unit located at SRS in Aiken, SC, and to provide an opportunity for public input into the remedial action selection process

  16. Contingency planning at the flotilla level in the United States Coast Guard Auxiliary: flotilla 81-a case study.

    Science.gov (United States)

    Schooley, Shawn Erik

    2013-01-01

    This article presents a case study of United States Coast Guard Auxiliary Flotilla 81. Flotilla 81 created its first formal, single agency contingency plan. The research question addressed is "How can a flotilla successfully develop a contingency plan?" Five emergent themes are identified. They are offered as suggested promising practices for other flotillas in need of creating a contingency plan. Findings suggest successful contingency planning is a result of effective collaboration with community partners. Network management theory is a key to an effective contingency planning process.

  17. Family planning policy in the United States: the converging politics of abortion and contraception.

    Science.gov (United States)

    Aiken, Abigail R A; Scott, James G

    2016-05-01

    Following decades of mainstream bipartisan support, contraception has reemerged as a controversial political issue in the United States. At the same time, opposition to abortion has intensified. State legislatures across the country have enacted highly visible policies limiting access to family planning. Perhaps the most striking example occurred in 2011 in Texas, when legislators instituted unprecedented requirements on abortion providers and cut public funding for contraception by two thirds. Yet, despite popular interpretations of this phenomenon as a simple byproduct of increasing partisan divisions, little is understood about the factors underlying such policy shifts. We fit Bayesian ideal-point models to analyze correlation patterns in record-vote data in the Texas House of Representatives in the 2003 and 2011 Legislatures. Both sessions had large Republican majorities and saw the passage of restrictive abortion bills, but they differed markedly with respect to public funding for contraception. We demonstrate that variation in voting on family-planning issues cannot be fully attributed to partisanship in either session. However, the politics of abortion and contraception have converged over time, and - at least for Democrats - the correlation between constituency characteristics and voting behavior on family-planning legislation is markedly higher in 2011 than in 2003. These shifts have been partly driven by legislators from high-poverty, majority Latino districts near the US-Mexico border. Recent dramatic shifts in family-planning policy go beyond simple partisan divisions. As the politics of abortion and contraception have converged, policies that are increasingly hostile to reproductive health and that disproportionately affect low-income minority women have emerged. Recent shifts in family-planning policy restrict women's access to contraception and abortion, yet little research has examined why such shifts are occurring. This paper analyzes factors

  18. Remedial design work plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-02-01

    The Remedial Design Work Plan (RDWP) for the Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee, has been prepared. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative, as stated in the Record of Decision (ROD) was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Thereafter, a public hearing was held to review the proposed plan. Comments were incorporated. The revised selected remedy, per the ROD is to excavate and dispose of floodplain soils contaminated above the remediation goal of 400 parts per million mercury. The approved ROD with this goal will be the basis for remedial design (RD). The RD work plan (RDWP) is composed of six chapters. An introductory chapter describes the purpose and scope of the RDWP, the selected remedy as identified by the ROD; the roles and responsibilities of the RD team members, and the site background information, including site history, contaminants of concern, and site characteristics. Chapter 2 contains the design objectives, RD approach, regulatory considerations during RD, and the design criteria with assumptions. Chapter 3 presents the RD planning process to prepare this RDWP, as well as secondary RD support plans. Chapter 4 describes the scope of the RD activities in more detail and identifies what will be included in the design package. Chapter 5 presents the schedule for performance of the RD activities, identifying key RD milestones. Specific documents used in the preparation of this document are referenced in Chapter 6

  19. Implementation of Programs for the Gifted/Talented: A Workbook for Educators and Parents.

    Science.gov (United States)

    California Association for the Gifted.

    Intended for use by educators and parents, the workbook is intended to help in the development or expansion of programs for the gifted and talented as required by the California Education Code's AB 1040, effective from 1980 to 1985. After introductory material, the first section provides a detailed interpretive analysis of AB 1040 noting the…

  20. Fundamentals of Welding. Teacher Edition [and] Student Edition [and] Student Workbook. Second Edition.

    Science.gov (United States)

    Fortney, Clarence; Gregory, Mike; New, Larry

    Teacher and student editions and a student workbook for fundamentals of welding comprise the first of six in a series of competency-based instructional materials for welding programs. Introductory pages in the teacher edition are training and competency profile, instructional/task analysis, basic skills icons and classifications, basic skills…

  1. Anaerobic Digestion I. Sludge Treatment and Disposal Course #166. Instructor's Guide [and] Student Workbook.

    Science.gov (United States)

    Arasmith, E. E.

    This lesson is the first of a two-part series on anaerobic digestion. Topics discussed include the five basic functions of an anaerobic digester, basic theory of the biological processes involved, basic equipment necessary for digestion, and the products of digestion. The lesson includes an instructor's guide and student workbook. The instructor's…

  2. Anaerobic Digestion II. Sludge Treatment and Disposal Course #166. Instructor's Guide [and] Student Workbook.

    Science.gov (United States)

    Arasmith, E. E.

    This lesson is the second of a two-part series on anaerobic digestion. Topics discussed include classification of digester by function, roof design, and temperature range, mixing systems, gas system components, operational control basics, and general safety considerations. The lesson includes an instructor's guide and student workbook. The…

  3. Instruction Workbook for Tracheostomy Suctioning and Misting in a School Setting.

    Science.gov (United States)

    Wolf, Karen McKinney; Roach, Antionette Andolfatto

    The handbook presents California guidelines for training school personnel to provide skilled nursing procedures such as tracheostomy suctioning and misting for students with special health needs. The workbook begins with an overview of the anatomy and function of the respiratory system, specifically breathing mechanics. Part 2 considers the…

  4. Word Function and Dictionary Use; A Work-Book for Advanced Learners of English.

    Science.gov (United States)

    Osman, Neile

    The present volume is designed as a workbook for advanced learners of English as a second or foreign language which will train them through instruction and exercises to use an all-English dictionary. The contents are based on the second edition of Hornby, Gatenby, and Wakefield's "The Advanced Learner's Dictionary of Current English," 1963, Oxford…

  5. Linguistic Gender Sensitivity Strategies in Current South African Intermediate Phase English Workbooks: Feminisation or Degenderisation?

    Science.gov (United States)

    Sibanda, Jabulani; Sibanda, Lucy

    2016-01-01

    This study extends research on manifestations of gender insensitivity in learners' reading materials by shifting attention to the linguistic strategies that authors of current texts employ for the realisation of gender sensitivity. We analysed the content of 12 current (2014) English workbooks (Grade 4-6) used in South African government and…

  6. Aerobic Digestion. Sludge Treatment and Disposal Course #166. Instructor's Guide [and] Student Workbook.

    Science.gov (United States)

    Klopping, Paul H.

    This lesson is a basic description of aerobic digestion. Topics presented include a general process overview discussion of a typical digester's components, factors influencing performance, operational controls, and biological considerations for successful operation. The lesson includes an instructor's guide and student workbook. The instructor's…

  7. Otros amigos, otras culturas: Libro de actividades, 2 (Other Friends, Other Cultures: Workbook 2).

    Science.gov (United States)

    Martinez, Emiliano; And Others

    This workbook was designed for use with the textbook of the same name. It contains exercises for the recognition of sounds and letters, reading comprehension, oral expression, and the use of diphthongs, compound words, idioms, synonyms and antonyms, word families, and dictionaries. The presentation includes drawings, puzzles, and games with color…

  8. Sanitary Landfill. Sludge Treatment and Disposal Course #166. Instructor's Guide [and] Student Workbook.

    Science.gov (United States)

    Sharman, Ronald M.

    This lesson is an introduction to disposal of sludge by landfill. A brief explanation of the complete process is provided, including discussions of sludge suitability, site selection, method selection and operation, site closure, and ultimate reuse. The lesson includes an instructor's guide and student workbook. The instructor's guide contains a…

  9. Planning for people? An evaluation of objectives for managing visitors at wildlife refuges in the United States

    Science.gov (United States)

    Jeffrey J. Brooks; Robert Massengale

    2011-01-01

    This study evaluates the quality of planning objectives for visitor services as written in Comprehensive Conservation Plans for the National Wildlife Refuge System of the United States. Planners in the U.S. Fish and Wildlife Service are predominantly writing public use objectives that address wildlife recreation and education. Results indicate that planners are writing...

  10. The Ten-Minute Neighbourhood Is [not] a Basic Planning Unit for Happiness in Egypt

    Directory of Open Access Journals (Sweden)

    Abeer Mohamed Elshater

    2016-04-01

    Full Text Available This paper investigates the relationship between inhabitants’ happiness and the right to the city in the status quo of Egyptian neighborhoods. Although services are easily accessible, by ten-minute walks in a suitable ambience, happiness is not achieved. The research aims to, first, review the literature that provides a guideline for ten-minute neighborhoods. Second, this study conducts a comparative content analysis of recent online articles on the right to the city. Third, the study tests findings from Egyptian neighborhood settings. The idea of a ten-minute neighborhood is manageable. The hypothesis concerns a compliant design. It is a logical assumption that people who live within ten minutes walking distance of essential facilities in their area can minimize several problems and maximize a healthy lifestyle. The supposed issue causes the right to the city to affect the relationship between ten-minute neighborhoods and citizens’ happiness. This assumption can be established through site observation and oriented questionnaires. This paper contributes by presenting new planning units that suit the current context of the old cities in the Middle East and North Africa region, based on walking distances of ten minutes or less with reference to the right to the city. This planning unit can result in citizens’ happiness.

  11. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  12. Managing carbon regulatory risk in utility resource planning: Current practices in the Western United States

    International Nuclear Information System (INIS)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-01-01

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by 15 electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without federal climate regulation in the US, the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of US electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

  13. Planning the Marketing Strategy. PACE Revised. Level 3. Unit 6. Research & Development Series No. 240CB6.

    Science.gov (United States)

    Ashmore, M. Catherine; Pritz, Sandra G.

    This individualized, competency-based unit on planning marketing strategy, the sixth of 18 modules, is on the third level of the revised Program for Acquiring Competence in Entrepreneurship (PACE). Intended for the advanced secondary and postsecondary levels and for adults wanting training or retraining, this unit, together with the other…

  14. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  15. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  16. Emergency planning requirements and short-term countermeasures for commercial nuclear power plants in the United States

    International Nuclear Information System (INIS)

    Kantor, F.; Hogan, R.; Mohseni, A.

    1995-01-01

    Since the accident at the Three Mile Island Unit, the United States Nuclear Regulatory's Commission (NRC's) emergency planning regulations are now considered and an important part of the regulatory framework for protecting the public health and safety. Many aspects of the countermeasures are presented: Emergency Planning Zones (EPZ), off-Site emergency planning and preparedness, responsibilities of nuclear power plants operators and states and local government. Finally, protective action recommendations are given as well as the federal response to an emergency. The authors noted that the use of potassium iodide is not considered as an effective countermeasure for the public protection in the US. (TEC). 1 fig

  17. Safety Evaluation Report on Tennessee Valley Authority: Browns Ferry Nuclear Performance Plan: Browns Ferry Unit 2 restart

    International Nuclear Information System (INIS)

    1989-04-01

    This safety evaluation report (SER) on the information submitted by the Tennessee Valley Authority (TVA) in its Nuclear Performance Plan, through Revision 2, for the Browns Ferry Nuclear Power Station and in supporting documents has been prepared by the US Nuclear Regulatory Commission staff. The plan addresses the plant-specific concerns requiring resolution before startup of Unit 2. The staff will inspect implementation of those programs. Where systems are common to Units 1 and 2 or to Units 2 and 3, the staff safety evaluations of those systems are included herein. 3 refs

  18. Family Planning Policy in the United States: The Converging Politics of Abortion and Contraception

    Science.gov (United States)

    Aiken, Abigail R.A.; Scott, James

    2016-01-01

    Objectives Following decades of mainstream bipartisan support, contraception has re-emerged as a controversial political issue in the United States. At the same time, opposition to abortion has intensified. State legislatures across the country have enacted highly visible policies limiting access to family planning. Perhaps the most striking example occurred in 2011 in Texas, when legislators instituted unprecedented requirements on abortion providers and cut public funding for contraception by two-thirds. Yet despite popular interpretations of this phenomenon as a simple byproduct of increasing partisan divisions, little is understood about the factors underlying such policy shifts. Study Design We fit Bayesian ideal-point models to analyze correlation patterns in record-vote data in the Texas House of Representatives in the 2003 and 2011 Legislatures. Both sessions had large Republican majorities and saw the passage of restrictive abortion bills, but they differed markedly with respect to public funding for contraception. Results We demonstrate that variation in voting on family-planning issues cannot be fully attributed to partisanship in either session. However, the politics of abortion and contraception have converged over time, and—at least for Democrats—the correlation between constituency characteristics and voting behavior on family-planning legislation is markedly higher in 2011 than in 2003. These shifts have been partly driven by legislators from high-poverty, majority Latino districts near the U.S.-Mexico border. Conclusions Recent dramatic shifts in family-planning policy go beyond simple partisan divisions. As the politics of abortion and contraception have converged, policies that are increasingly hostile to reproductive health and that disproportionately affect low-income minority women have emerged. PMID:26794846

  19. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2002-01-01

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  20. In the United States, a Mother's Plans for Infant Feeding Are Associated with Her Plans for Employment.

    Science.gov (United States)

    Mirkovic, Kelsey R; Perrine, Cria G; Scanlon, Kelley S; Grummer-Strawn, Laurence M

    2014-08-01

    The American Academy of Pediatrics recommends 6 months of exclusive breastfeeding, however, only 16% of US infants meet this recommendation. Shorter exclusive/predominant breastfeeding durations have been observed from women who return to work early and/or full-time. We assessed the relationship between prenatal plans for maternity leave duration and return to full-time/part-time status and plans for exclusive breastfeeding. This study included 2348 prenatally employed women from the Infant Feeding Practices Study II (2005-2007) who planned to return to work in the first year postpartum. Bivariate analysis and logistic regression were used to describe the association of maternity leave duration and return status with plans for infant feeding. Overall, 59.5% of mothers planned to exclusively breastfeed in the first few weeks. Mothers planning to return to work within 6 weeks had 0.60 times the odds (95% confidence interval [CI], 0.46-0.77) and mothers planning to return between 7 and 12 weeks had 0.72 times the odds (95% CI, 0.56-0.92) of planning to exclusively breastfeed compared with mothers who were planning to return after 12 weeks. Prenatal plans to return full-time (≥ 30 hours/week vs part-time) were also associated with lower odds of planning to exclusively breastfeed (adjusted odds ratio = 0.61; 95% CI, 0.51-0.77). Mothers planning to return to work before 12 weeks and/or full-time were less likely to plan to exclusively breastfeed. Longer maternity leave and/or part-time return schedules may increase the proportion of mothers who plan to exclusively breastfeed. © International Lactation Consultant Association 2014.

  1. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  2. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  3. Security planning an applied approach

    CERN Document Server

    Lincke, Susan

    2015-01-01

    This book guides readers through building an IT security plan. Offering a template, it helps readers to prioritize risks, conform to regulation, plan their defense and secure proprietary/confidential information. The process is documented in the supplemental online security workbook. Security Planning is designed for the busy IT practitioner, who does not have time to become a security expert, but needs a security plan now. It also serves to educate the reader of a broader set of concepts related to the security environment through the Introductory Concepts and Advanced sections. The book serv

  4. Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Waste Management Plan

    International Nuclear Information System (INIS)

    G. L. Schwendiman

    2006-01-01

    This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition

  5. An extended theory of planned behavior to predict consumers' willingness to buy mobile slaughter unit meat.

    Science.gov (United States)

    Hoeksma, Djura L; Gerritzen, Marien A; Lokhorst, Anne Marike; Poortvliet, P Marijn

    2017-06-01

    The current study investigated the determinants of consumers' intention to purchase meat from mobile slaughter units (MSU). The theory of planned behavior (TPB) and the value belief norm theory (VBN) were used as conceptual lenses to guide this investigation. We conducted a survey among 329 respondents in the Netherlands who buy meat for themselves and/or for others. The results indicated that (1) TPB and VBN explain a high proportion of the variance in consumers' intention to buy MSU meat, and that (2) an extended TPB that includes peoples' attitude, personal norm, subjective norm, and perceived behavioral control turned out to be the best model to predict willingness to buy MSU meat. Further implications for future research and practice are discussed. Copyright © 2017 Elsevier Ltd. All rights reserved.

  6. Test plan for the field evaluation and demonstration of the Contamination Control Unit

    International Nuclear Information System (INIS)

    Winberg, M.R.; Thompson, D.N.

    1993-06-01

    This report describes test details of a full demonstration of the Contamination Control Unit (CCU). The CCU is a mobile trailer capable of employing the use of soil fixatives, dust suppression agents, misting, and vacuum systems. These systems can perform a large number of contamination control functions to support the Office of Waste Technology Development (OTD) Buried Waste Integrated Demonstration (BWID) projects, transuranic (TRU) waste retrieval operations, and emergency response for hazardous and radioactive materials incidents. The demonstration will include both performance testing at the North Holmes Laboratory Facility (NHLF) and field testing in conjunction with the Remote Excavation System Demonstration at the Cold Test Pit. The NHLF will test operational parameters using water only, and the field demonstration at the Cold Test Pit involves full scale operation of vacuum, fixant, misting, and dust suppression systems. Test objectives, detailed experimental procedures, and data quality objectives necessary to perform the field demonstration are included in this test plan

  7. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K trademark resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well

  8. Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-05-01

    This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

  9. Development and status of the AL Mixed Waste Treatment Plan or I love that mobile unit of mine

    International Nuclear Information System (INIS)

    Bounini, L.; Williams, M.; Zygmunt, S.

    1995-01-01

    Nine Department of Energy (DOE) sites reporting to the Albuquerque Office (AL) have mixed waste that is chemically hazardous and radioactive. The hazardous waste regulations require the chemical portion of mixed waste to be to be treated to certain standards. The total volume of low-level mixed waste at the nine sites is equivalent to 7,000 drums, with individual site volumes ranging from 1 gallon of waste at the Pinellas Plant to 4,500 drums at Los Alamos National Laboratory. Nearly all the sites have a diversity of wastes requiring a diversity of treatment processes. Treatment capacity does not exist for much of this waste, and it would be expensive for each site to build the diversity of treatment processes needed to treat its own wastes. DOE-AL assembled a team that developed the AL Mixed Waste Treatment Plan that uses the resources of the nine sites to treat the waste at the sites. Work on the plan started in October 1993, and the plan was finalized in March 1994. The plan uses commercial treatment, treatability studies, and mobile treatment units. The plan specifies treatment technologies that will be built as mobile treatment units to be moved from site to site. Mobile units include bench-top units for very small volumes and treatability studies, drum-size units that treat one drum per day, and skid-size units that handle multiple drum volumes. After the tools needed to treat the wastes were determined, the sites were assigned to provide part of the treatment capacity using their own resources and expertise. The sites are making progress on treatability studies, commercial treatment, and mobile treatment design and fabrication. To date, this is the only plan for treating waste that brings the resources of several DOE sites together to treat mixed waste. It is the only program actively planning to use mobile treatment coordinated between DOE sites

  10. Programmatic changes due to TMI-2 [Three Mile Island Unit 2]: Accident planning

    International Nuclear Information System (INIS)

    Wingert, V.L.

    1988-01-01

    The focus of the paper is lessons learned for emergency planning and preparedness form the Three Mile Island Unit 2 (TMI-2) accident. The lessons learned are examined from two perspectives: (a) lessons learned that have resulted in programmatic changes, and (b) lessons learned that have not been adequately addressed. There is no doubt that the TMI-2 accident is the pivotal event that caused a major rethinking of the pre-TMI emergency preparedness posture and led to a fundamentally different approach to emergency preparedness for commercial nuclear power plant accidents. While this new approach has evolved into a comprehensive, systematic, and even prototypical national program, it has also generated new problems: escalating costs for state and local governments and leveraging of the federal licensing process by state and local governments who do not want specific nuclear power plants to operate. A discussion of the primary lessons learned on emergency preparedness is presented under the following topics: beyond defense-in-depth, predetermined action, mandatory emergency planning and preparedness, and federal coordination

  11. Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-10-01

    The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

  12. United States high-level radioactive waste management program: Current status and plans

    International Nuclear Information System (INIS)

    Williams, J.

    1992-01-01

    The inventory of spent fuel in storage at reactor sites in the United States is approximately 20,000 metric tons heavy metal (MTHM). It is increasing at a rate of 1700 to 2100 MTHM per year. According to current projections, by the time the last license for the current generation of nuclear reactors expires, there will be an estimated total of 84,000 MTHm. No commercial reprocessing capacity exists or is planned in the US. Therefore, the continued storage of spent fuel is required. The majority of spent fuel remains in the spent fuel pools of the utilities that generated it. Three utilities are presently supplementing pool capacity with on-site dry storage technologies, and four others are planning dry storage. Commercial utilities are responsible for managing their spent fuel until the Federal waste management system, now under development, accepts spent fuel for storage and disposal. Federal legislation charges the Office of Civilian Radioactive Waste Management (OCRWM) within the US Department of Energy (DOE) with responsibility for developing a system to permanently dispose of spent fuel and high level radioactive waste in a manner that protects the health and safety of the public and the quality of the environment. We are developing a waste management system consisting for three components: a mined geologic repository, with a projected start date of 2010; a monitored retrievable storage facility (MRS), scheduled to begin waste acceptance in 1998; and a transportation system to support MRS and repository operations. This paper discusses the background and framework for the program, as well as the current status and plans for management of spent nuclear fuel at commercial utilities; the OCRWM's development of a permanent geologic repository, an MRS, and a transportation system; the OCRWM's safety approach; the OCRWM's program management initiatives; and the OCRWM's external relations activities

  13. Integrated test plan for the field demonstration of the supported liquid membrane unit

    International Nuclear Information System (INIS)

    Dunks, K.L.; Hodgson, K.M.

    1995-06-01

    This Integrated Test Plan describes the operation and testing of a hybrid reverse osmosis (RO)/coupled transport (CT) groundwater remediation test unit, also referred to as the Environmental Restoration Technology Demonstrations at the Hanford Site. The SLM will be used to remove uranium, technetium-99, and nitrate from a selected groundwater source at the Hanford Site. The overall purpose of this test is to determine the efficiency of the RO/CT membranes operating in a hybrid unit, the ease of operating and maintaining the SLM, and the amount of secondary waste generated as a result of processing. The goal of the SLM is to develop a RO/CT process that will be applicable for removing contaminants from almost any contaminated water. This includes the effluents generated as part of the day-to-day operation of most any US Department of Energy (DOE) site. The removal of contaminants from the groundwaters before they reach the Columbia River or offsite extraction wells will reduce the risk that the population will be exposed to these compounds and will reduce the cost of subsequent groundwater cleanup

  14. Introduction dosimetric data of cobalt-60 unit in planning new Win-PTL- 3D

    International Nuclear Information System (INIS)

    Gonzalez Perez, Yelina; Rodriguez Zayas, Michael; Perez Guevara, Adrian; Sanchez Zamora, Luis; Reyes Gonzalez, Tommy; Sola Rodriguez, Yeline; Caballero, Roberto; Cruz Marcane, Viviana

    2009-01-01

    3D planning is based on the individual and image reconstruction formation of fields, allowing better absorption of dose volume White minimizing damage to surrounding healthy tissue. During the clinical implementation of the Win-PLT software includes validation from the implementation of dosimetric acceptance tests through a series of precise experimental measurements, reflecting different clinical situations (test cases). For the commissioning characterized the photon beam Cobalt Unit 60, taking measurements with a set consisting of a phantom dosimetric automatic ionization chambers and electrometer Tandem. The measured data are used to power the TPS through WINCOM auxiliary program that lets you adjust a number of parameters to model the photon beam. This adjustment is made by comparing the PDD curves and profiles of experimental data with modeled data. The test cases performed are in compliance with the requirements proposed in the geometric of the AAPM TG55. The modeling of beam dosimetry data was successful, since the discrepancies were within the criteria TRS-430. The cases involved events where points near the edge of the field and in the presence of blocking a discrepancy outside the tolerance, suggesting not to use these items for purposes of limitation. Win TPS-PLT is suitable for clinical use with the photon beam Cobalt Unit 60, backed by the reliability that dropped on the results of beam modeling and verification of dosimetric calculations. (Author)

  15. Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Shannon Parsons

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973 to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.

  16. Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

    Science.gov (United States)

    Mason, Lee; Palac, Donald; Gibson, Marc; Houts, Michael; Warren, John; Werner, James; Poston, David; Qualls, Arthur Lou; Radel, Ross; Harlow, Scott

    2012-01-01

    A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

  17. Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2004-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the 'Federal Facility Agreement and Consent Order' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions

  18. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Wickline, Alfred

    2005-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action

  19. Advance Care Planning in palliative care: a qualitative investigation into the perspective of Paediatric Intensive Care Unit staff.

    Science.gov (United States)

    Mitchell, Sarah; Dale, Jeremy

    2015-04-01

    The majority of children and young people who die in the United Kingdom have pre-existing life-limiting illness. Currently, most such deaths occur in hospital, most frequently within the intensive care environment. To explore the experiences of senior medical and nursing staff regarding the challenges associated with Advance Care Planning in relation to children and young people with life-limiting illnesses in the Paediatric Intensive Care Unit environment and opportunities for improvement. Qualitative one-to-one, semi-structured interviews were conducted with Paediatric Intensive Care Unit consultants and senior nurses, to gain rich, contextual data. Thematic content analysis was carried out. UK tertiary referral centre Paediatric Intensive Care Unit. Eight Paediatric Intensive Care Unit consultants and six senior nurses participated. Four main themes emerged: recognition of an illness as 'life-limiting'; Advance Care Planning as a multi-disciplinary, structured process; the value of Advance Care Planning and adverse consequences of inadequate Advance Care Planning. Potential benefits of Advance Care Planning include providing the opportunity to make decisions regarding end-of-life care in a timely fashion and in partnership with patients, where possible, and their families. Barriers to the process include the recognition of the life-limiting nature of an illness and gaining consensus of medical opinion. Organisational improvements towards earlier recognition of life-limiting illness and subsequent Advance Care Planning were recommended, including education and training, as well as the need for wider societal debate. Advance Care Planning for children and young people with life-limiting conditions has the potential to improve care for patients and their families, providing the opportunity to make decisions based on clear information at an appropriate time, and avoid potentially harmful intensive clinical interventions at the end of life. © The Author(s) 2015.

  20. Neonatal Mortality of Planned Home Birth in the United States in Relation to Professional Certification of Birth Attendants

    OpenAIRE

    Gr?nebaum, Amos; McCullough, Laurence B.; Arabin, Birgit; Brent, Robert L.; Levene, Malcolm I.; Chervenak, Frank A.

    2016-01-01

    Introduction Over the last decade, planned home births in the United States (US) have increased, and have been associated with increased neonatal mortality and other morbidities. In a previous study we reported that neonatal mortality is increased in planned home births but we did not perform an analysis for the presence of professional certification status. Purpose The objective of this study therefore was to undertake an analysis to determine whether the professional certification status of...

  1. Undergraduate Game Degree Programs in the United Kingdom and United States: A Comparison of the Curriculum Planning Process

    Science.gov (United States)

    McGill, Monica M.

    2010-01-01

    Digital games are marketed, mass-produced, and consumed by an increasing number of people and the game industry is only expected to grow. In response, post-secondary institutions in the United Kingdom (UK) and the United States (US) have started to create game degree programs. Though curriculum theorists provide insight into the process of…

  2. 40 CFR Appendix A to Subpart III... - States With Approved State Implementation Plan Revisions Concerning CAIR SO2 Opt-In Units

    Science.gov (United States)

    2010-07-01

    ... Implementation Plan Revisions Concerning CAIR SO2 Opt-In Units A Appendix A to Subpart III of Part 97 Protection... BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR SO2 Opt-in Units Pt. 97, Subpt. III... Concerning CAIR SO2 Opt-In Units 1. The following States have State Implementation Plan revisions under § 51...

  3. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  4. Workbook for prioritizing petroleum industry exploration and production sites for remediation

    International Nuclear Information System (INIS)

    White, G.J.

    1998-01-01

    The purpose of this Workbook is to provide a screening-level method for prioritizing petroleum exploration and production sites for remediation that is based on readily available information, but which does not require a full characterization of the sites being evaluated. The process draws heavily from the Canadian National Classification System for Contaminated Sites, and fits into the framework for ecological risk assessment provided in guidance from the US Environmental Protection Agency. Using this approach, scoring guidelines are provided for a number of Evaluation Factors relating to: (1) the contaminants present at the site; (2) the potential exposure pathways for these contaminants; and (3) the potential receptors of those contaminants. The process therefore incorporates a risk-based corrective action (RBCA) framework to estimate the relative threat posed by a site to human health and to ecological systems. Physical (non-toxic) disturbance factors have also been incorporated into the process. It should also be noted that the process described in this Workbook has not yet been field tested at petroleum E and P sites. The first logical step in the field testing of this process is to apply the method at a small number of sites to assess the availability of the information that is needed to score each evaluation factor. Following this evaluation, the Workbook process should be applied at a series of sites to determine the effectiveness of the process at ranking sites according to their relative need for remediation. Upon completion of these tests, the Workbook should be revised to reflect the findings of the field tests

  5. Data Quality Objectives Workbook for Assessing Chemical Vulnerability Potential in REDOX and U Plants

    International Nuclear Information System (INIS)

    Bauer, R. G.

    1999-01-01

    The purpose of this data quality objective workbook is to present the rationale for selecting the sampling and characterization strategy that supports the assessment of the chemical vulnerabilities of the five tanks. Since characterization of the tanks' contents is likely to be expensive, a secondary goal was established to characterize the tank contents for proper waste designation and disposal at the same time the tanks are characterized for chemical vulnerability

  6. Workbooks to virtual worlds: a pilot study comparing educational tools to foster a culture of safety and respect in Ontario.

    Science.gov (United States)

    Mallette, Claire; Duff, Margaret; McPhee, Carolyn; Pollex, Heather; Wood, Anya

    2011-01-01

    Nurses frequently experience horizontal violence in their interactions with nursing colleagues within the workplace. By definition, horizontal violence includes such disrespectful behaviours as intimidation, coercion, bullying, criticism, exclusion or belittling. Educational programs addressing horizontal violence have been developed, but few have been evaluated with respect to knowledge acquisition and transfer. The purpose of this paper is to describe an experimental effectiveness study, using a pre/post design with a control group (total N=164). The research evaluated an innovative educational program in which nurses, using avatars, role-played strategies to address horizontal violence within a virtual nursing unit developed on the Second Life platform. The results of participating in this program were compared with more traditional educational methodologies, such as a workbook and a self-directed e-learning module. While all strategies were perceived by participants as beneficial, the findings from this study suggest that learning through the self-directed e-learning module followed with practice in a virtual world is an effective way of acquiring knowledge, skills and abilities to better address horizontal violence.

  7. Pre-feasibility workbook for bioenergy projects in eastern Ontario : executive summary

    International Nuclear Information System (INIS)

    Rees, C.; Bradley, D.; DeYoe, D.

    2007-03-01

    This summary provided details of a pre-feasibility workbook designed to assist communities and developers in better understanding bioenergy challenges and opportunities in Ontario. The workbook examined issues related to the conversion of biomass through thermal conversion technologies and focused on combined heat and power projects that used forest and agricultural biomass in order to produce up to 10 MW of electricity under the Ontario Renewable Standard Offer Program. As part of the program, new generators of no more than 10 MW are paid a base rate of 11 cents per kWh and an additional 3.52 cents per kWh for on-peak production. The workbook was comprised of a review of biomass supply in the eastern Ontario region and included both forested and abandoned farm lands. A base-line financial analysis was included to assess the feasibility of projects using combustion, pyrolysis, and gasification technologies. Biomass sources in the region included mill residue, harvest waste, biomass mortality from natural events, stand management, and standing timber. Key elements required for parties interested in considering a bioenergy business initiative were also included

  8. A comparison of online versus workbook delivery of a self-help positive parenting program.

    Science.gov (United States)

    Sanders, Matthew R; Dittman, Cassandra K; Farruggia, Susan P; Keown, Louise J

    2014-06-01

    A noninferiority randomized trial design compared the efficacy of two self-help variants of the Triple P-Positive Parenting Program: an online version and a self-help workbook. We randomly assigned families of 193 children displaying early onset disruptive behavior difficulties to the online (N = 97) or workbook (N = 96) interventions. Parents completed questionnaire measures of child behavior, parenting, child maltreatment risk, personal adjustment and relationship quality at pre- and post-intervention and again at 6-month follow up. The short-term intervention effects of the Triple P Online program were not inferior to the workbook on the primary outcomes of disruptive child behavior and dysfunctional parenting as reported by both mothers and fathers. Both interventions were associated with significant and clinically meaningful declines from pre- to post-intervention in levels of disruptive child behavior, dysfunctional parenting styles, risk of child maltreatment, and inter-parental conflict on both mother and father report measures. Intervention effects were largely maintained at 6-month follow up, thus supporting the use of self-help parenting programs within a comprehensive population-based system of parenting support to reduce child maltreatment and behavioral problems in children.

  9. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  10. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  11. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report

  12. Public Participation Plan for Waste Area Group 7 Operable Unit 7-13/14 at the Idaho National Laboratory Site

    International Nuclear Information System (INIS)

    B. G. Meagher

    2007-01-01

    This Public Participation Plan outlines activities being planned to: (1) brief the public on results of the remedial investigation and feasibility study, (2) discuss the proposed plan for remediation of Operable Unit 7-13/14 with the public, and (3) encourage public participation in the decision-making process. Operable Unit 7-13/14 is the Comprehensive Remedial Investigation/Feasibility Study for Waste Area Group 7. Analysis focuses on the Subsurface Disposal Area (SDA) within the Radioactive Waste Management Complex at the Idaho National Laboratory (Site). This plan, a supplement to the Idaho National Laboratory Community Relations Plan (DOE-ID 2004), will be updated as necessary. The U.S. Department of Energy (DOE), Idaho Department of Environmental Quality (DEQ), and U.S. Environmental Protection Agency (EPA) will participate in the public involvement activities outlined in this plan. Collectively, DOE, DEQ, and EPA are referred to as the Agencies. Because history has shown that implementing the minimum required public involvement activities is not sufficient for high-visibility cleanup projects, this plan outlines additional opportunities the Agencies are providing to ensure that the public's information needs are met and that the Agencies can use the public's input for decisions regarding remediation activities

  13. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  14. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy's (DOE's) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow

  15. Placentophagy among women planning community births in the United States: Frequency, rationale, and associated neonatal outcomes.

    Science.gov (United States)

    Benyshek, Daniel C; Cheyney, Melissa; Brown, Jennifer; Bovbjerg, Marit L

    2018-05-02

    Limited systematic research on maternal placentophagy is available to maternity care providers whose clients/patients may be considering this increasingly popular practice. Our purpose was to characterize the practice of placentophagy and its attendant neonatal outcomes among a large sample of women in the United States. We used a medical records-based data set (n = 23 242) containing pregnancy, birth, and postpartum information for women who planned community births. We used logistic regression to determine demographic and clinical predictors of placentophagy. Finally, we compared neonatal outcomes (hospitalization, neonatal intensive unit admission, or neonatal death in the first 6 weeks) between placenta consumers and nonconsumers, and participants who consumed placenta raw vs cooked. Nearly one-third (31.2%) of women consumed their placenta. Consumers were more likely to have reported pregravid anxiety or depression compared with nonconsumers. Most (85.7%) placentophagic mothers consumed their placentas in encapsulated form, and nearly half (49.1%) consumed capsules containing dehydrated, uncooked placenta. Placentophagy was not associated with any adverse neonatal outcomes. Women with home births were more likely to engage in placentophagy than women with birth center births. The most common reason given (58.6%) for engaging in placentophagy was to prevent postpartum depression. The majority of women consumed their placentas in uncooked/encapsulated form and hoping to avoid postpartum depression, although no evidence currently exists to support this strategy. Preparation technique (cooked vs uncooked) did not influence adverse neonatal outcomes. Maternity care providers should discuss the range of options available to prevent/treat postpartum depression, in addition to current evidence with respect to the safety of placentophagy. © 2018 Wiley Periodicals, Inc.

  16. Status Report and Research Plan for Cables Harvested from Crystal River Unit 3 Nuclear Generating Plant

    Energy Technology Data Exchange (ETDEWEB)

    Fifield, Leonard S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-09-20

    Harvested cables from operating or decommissioned nuclear power plants present an important opportunity to validate models, understanding material aging behavior, and validate characterization techniques. Crystal River Unit 3 Nuclear Generating Plant is a pressurized water reactor that was licensed to operate from 1976 to 2013. Cable segments were harvested and made available to the Light Water Reactor Sustainability research program through the Electric Power Research Institute. Information on the locations and circuits within the reactor from whence the cable segments came, cable construction, sourcing and installation information, and photographs of the cable locations prior to harvesting were provided. The cable variations provided represent six of the ten most common cable insulations in the nuclear industry and experienced service usage for periods from 15 to 42 years. Subsequently, these cables constitute a valuable asset for research to understand aging behavior and measurement of nuclear cables. Received cables harvested from Crystal River Unit 3 Nuclear Generating Plant consist of low voltage, insulated conductor surrounded by jackets in lengths from 24 to 100 feet each. Cable materials will primarily be used to investigate aging under simultaneous thermal and gamma radiation exposure. Each cable insulation and jacket material will be characterized in its as-received condition, including determination of the temperatures associated with endothermic transitions in the material using differential scanning calorimetry and dynamic mechanical analysis. Temperatures for additional thermal exposure aging will be selected following the thermal analysis to avoid transitions in accelerated laboratory aging that do not occur in field conditions. Aging temperatures above thermal transitions may also be targeted to investigate the potential for artifacts in lifetime prediction from rapid accelerated aging. Total gamma doses and dose rates targeted for each material

  17. Energy management handbook for building operating engineers student workbook

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The handbook provides operating engineers with the basic information needed to implement specific energy conservation opportunities, and additional information is presented relative to the formulation and development of the energy management plan. Chapters are entitled: The Need for Energy Management (International Factors, The US Energy Situation, Energy and the Building Owner); The Fundamentals of Energy Consumption in Buildings (Energy Basics, Heat Basics, Heat Flow and the Building Envelope, Air and Comfort, Factors Affecting Energy Use In Buildings); Principles of Energy Conservation (Building Energy Consumption Characteristics); Planning the Energy Management Program (Obtaining Commitment and Support, Establishing the Energy Use Index, Organizing to Develop the Plan, Developing and Implementing the Plan); Conducting a Survey of Facilities and Operations (The Energy Audit, Preparation of Building and Systems Profile, Measurement and Instrumentation); Guidelines for Energy Conservation (Operator ECO's, Owner ECO'S); Developing the Draft Final Plan (Analyze Survey Findings, Putting the Plan on Paper, Review and Submit); Implementing the Program (Developing the Final Plan, Implementing the Plan, Monitoring and Updating the Program). A glossary is included and specific information on degree days and cooling hours for some selected cities and a computer energy study data for the New York Hilton are included in appendices. (MCW)

  18. Closure plan for the Test Area North-726 chromate water storage and Test Area North-726A chromate treatment units

    International Nuclear Information System (INIS)

    Smith, P.J.; Van Brunt, K.M.

    1992-11-01

    This document describes the proposed plan for closure of the Test Area North-726 chromate water storage and Test Area North-726A chromate treatment units at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act interim status closure requirements. The location, size, capacity, and history of the units are described, and their current status is discussed. The units will be closed by treating remaining waste in storage, followed by thorough decontamination of the systems. Sufficient sampling and analysis, and documentation of all activities will be performed to demonstrate clean closure

  19. Resource Conservation and Recovery Act closure plan for the Intermediate-Level Transuranic Storage Facility mixed waste container storage units

    International Nuclear Information System (INIS)

    Nolte, E.P.; Spry, M.J.; Stanisich, S.N.

    1992-11-01

    This document describes the proposed plan for clean closure of the Intermediate-Level Transuranic Storage Facility mixed waste container storage units at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. Descriptions of the location, size, capacity, history, and current status of the units are included. The units will be closed by removing waste containers in storage, and decontamination structures and equipment that may have contacted waste. Sufficient sampling and documentation of all activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  20. Approach and plan for cleanup actions in the 100-FR-2 operable unit of the Hanford Site, Revision 0

    International Nuclear Information System (INIS)

    1995-06-01

    A new administrative approach is being used to reach a cleanup decision for the 100-FR-2 Operable Unit. The unit, located at the 100-F Area, contains solid waste sites and is one of the remaining operable units scheduled for characterization and cleanup in the 100 Area. This Focus Package (1) describes the new approach and activities needed to reach a decision on cleanup actions for the 100-FR-2 Operable Unit and (2) invites public participation into the planning process. The previous approach included the production of a Work Plan, a Limited Field Investigation Report, a Qualitative Risk Assessment, a Focused Feasibility Study, and a Proposed Plan, all culminating in an interim action Record of Decision. Information gathered to date on other operable units allows the analgous site approach to be used on the 100-FR-2 Operable Unit, and therefore, a reduction in documentation preparation. The U.S. Environmental Protection Agency, Washington State Department of Ecology, and the U.S. Department of Energy (Tri-Party Agreement) believe that the new approach will save time and funding. In the new approach, the Work Plan has been condensed into this 12 page Focus Package. The Focus Package includes a summary of 100-F Area information, a list of waste sites in the 100-FR-2 Operable Unit, a summary of proposed work, and a schedule. The new approach will also combine the Limited Field Investigation and Qualitative Risk Assessment reports into the Focused Feasibility Study. The Focused Feasibility Study will analyze methods and costs to clean up waste sites. Consolidating the documents should reduce the time to complete the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process by 16 months, compared to the previous approach

  1. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents of concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern

  2. The segment as the minimal planning unit in speech production: evidence based on absolute response latencies.

    Science.gov (United States)

    Kawamoto, Alan H; Liu, Qiang; Lee, Ria J; Grebe, Patricia R

    2014-01-01

    A minimal amount of information about a word must be phonologically and phonetically encoded before a person can begin to utter that word. Most researchers assume that the minimum is the complete word or possibly the initial syllable. However, there is some evidence that the initial segment is sufficient based on longer durations when the initial segment is primed. In two experiments in which the initial segment of a monosyllabic word is primed or not primed, we present additional evidence based on very short absolute response times determined on the basis of acoustic and articulatory onset relative to presentation of the complete target. We argue that the previous failures to find very short absolute response times when the initial segment is primed are due in part to the exclusive use of acoustic onset as a measure of response latency, the exclusion of responses with very short acoustic latencies, the manner of articulation of the initial segment (i.e., plosive vs. nonplosive), and individual differences. Theoretical implications of the segment as the minimal planning unit are considered.

  3. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents of concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.

  4. The development of landscape-scale ecological units and their application to the greater Huachuca Mountains fire planning process

    Science.gov (United States)

    Larry E. Laing; David Gori; James T. Jones

    2005-01-01

    The multi-partner Greater Huachuca Mountains fire planning effort involves over 500,000 acres of public and private lands. This large area supports distinct landscapes that have evolved with fire. Utilizing GIS as a tool, the United States Forest Service (USFS), General Ecosystem Survey (GES), and Natural Resources Conservation Service (NRCS) State Soil Geographic...

  5. Proposed plan for the 100-IU-1, 100-IU-3, 100-IU-4, AND 100-IU-5 Operable Units

    International Nuclear Information System (INIS)

    1995-06-01

    This proposed plan identifies the preferred alternative for the Riverland Rad Yard, the Wahluke Slope, the Sodium Dichromate Baffel Landfill, and the, White Bluffs Pickling Acid Cribs, located at the Hanford Site. These areas are known respectively as the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. Between 1992 and 1994, each of the four operable units was the subject of an expedited response action that addressed removal of site contaminants in soil. Waste sites in the 100-IU-2 (White Bluffs Townsite) and 100-IU-6 (Hanford Townsite) Operable Units will be addressed in future proposed plans. A proposed plan is intended to be a fact sheet for public review that summarizes the information relied upon to recommend the preferred alternative. As presented in this proposed plan, no further action is the preferred alternative for the final resolution of the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. The preferred alternative is recommended because all suspect hazardous substances above cleanup levels have been removed from the waste sites, and the sites are unlikely to pose any significant risk to human health or the environment

  6. Grammatical Planning Units during Real-Time Sentence Production in Speakers with Agrammatic Aphasia and Healthy Speakers

    Science.gov (United States)

    Lee, Jiyeon; Yoshida, Masaya; Thompson, Cynthia K.

    2015-01-01

    Purpose: Grammatical encoding (GE) is impaired in agrammatic aphasia; however, the nature of such deficits remains unclear. We examined grammatical planning units during real-time sentence production in speakers with agrammatic aphasia and control speakers, testing two competing models of GE. We queried whether speakers with agrammatic aphasia…

  7. Evaluation of the impact of implementation of a Medical Assessment and Planning Unit on length of stay

    NARCIS (Netherlands)

    Brand, Caroline A.; Kennedy, Marcus P.; King-Kallimanis, Bellinda L.; Williams, Ged; Bain, Christopher A.; Russell, David M.

    2010-01-01

    Objective: The Medical Assessment and Planning Unit (MAPU) model provides a multidisciplinary and 'front end loading' approach to acute medical care. The objective of this study was to evaluate the impact of a 10-bed MAPU in Royal Melbourne Hospital (RMH) on hospital length of stay. A pre-post study

  8. Planning the Marketing Strategy. PACE Revised. Level 1. Unit 6. Research & Development Series No. 240AB6.

    Science.gov (United States)

    Ashmore, M. Catherine; Pritz, Sandra G.

    This lesson on planning a marketing strategy, the sixth in a series of 18 units, is part of the first level of a comprehensive entrepreneurship curriculum entitled: A Program for Acquiring Competence in Entrepreneurship (PACE). (Designed for use with secondary students, the first level of PACE introduces students to the concepts involved in…

  9. Planning the Marketing Strategy. PACE Revised. Level 2. Unit 6. Research & Development Series No. 240BB6.

    Science.gov (United States)

    Ashmore, M. Catherine; Pritz, Sandra G.

    This unit on planning marketing strategy for a small business, the sixth in a series of 18 modules, is on the second level of the revised PACE (Program for Acquiring Competence in Entrepreneurship) comprehensive curriculum. Geared to advanced secondary and beginning postsecondary or adult students, the modules provide an opportunity to learn about…

  10. Statement of Basis/Proposed Plan for the Gunsite 720 Rubble Pit Unit (631-18G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1996-07-01

    This Statement of Basis/Proposed Plan for the Gunsite 720 Rubble Pit Unit is issued by the U.S. Department of Energy, the lead agency for the Savannah River Site remedial activities, with concurrence by the U.S. Environmental Protection Agency - Region IV, and the South Carolina Department of Health and Environmental Control

  11. International Space Station (ISS) Plasma Contactor Unit (PCU) Utilization Plan Assessment Update

    Science.gov (United States)

    Hernandez-Pellerano, Amri; Iannello, Christopher J.; Garrett, Henry B.; Ging, Andrew T.; Katz, Ira; Keith, R. Lloyd; Minow, Joseph I.; Willis, Emily M.; Schneider, Todd A.; Whittlesey, Edward J.; hide

    2014-01-01

    The International Space Station (ISS) vehicle undergoes spacecraft charging as it interacts with Earth's ionosphere and magnetic field. The interaction can result in a large potential difference developing between the ISS metal chassis and the local ionosphere plasma environment. If an astronaut conducting extravehicular activities (EVA) is exposed to the potential difference, then a possible electrical shock hazard arises. The control of this hazard was addressed by a number of documents within the ISS Program (ISSP) including Catastrophic Safety Hazard for Astronauts on EVA (ISS-EVA-312-4A_revE). The safety hazard identified the risk for an astronaut to experience an electrical shock in the event an arc was generated on an extravehicular mobility unit (EMU) surface. A catastrophic safety hazard, by the ISS requirements, necessitates mitigation by a two-fault tolerant system of hazard controls. Traditionally, the plasma contactor units (PCUs) on the ISS have been used to limit the charging and serve as a "ground strap" between the ISS structure and the surrounding ionospheric plasma. In 2009, a previous NASA Engineering and Safety Center (NESC) team evaluated the PCU utilization plan (NESC Request #07-054-E) with the objective to assess whether leaving PCUs off during non-EVA time periods presented risk to the ISS through assembly completion. For this study, in situ measurements of ISS charging, covering the installation of three of the four photovoltaic arrays, and laboratory testing results provided key data to underpin the assessment. The conclusion stated, "there appears to be no significant risk of damage to critical equipment nor excessive ISS thermal coating damage as a result of eliminating PCU operations during non- EVA times." In 2013, the ISSP was presented with recommendations from Boeing Space Environments for the "Conditional" Marginalization of Plasma Hazard. These recommendations include a plan that would keep the PCUs off during EVAs when the

  12. Corrective Action Investigation Plan for Corrective Action Unit 542: Disposal Holes, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Laura Pastor

    2006-01-01

    Corrective Action Unit (CAU) 542 is located in Areas 3, 8, 9, and 20 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 542 is comprised of eight corrective action sites (CASs): (1) 03-20-07, ''UD-3a Disposal Hole''; (2) 03-20-09, ''UD-3b Disposal Hole''; (3) 03-20-10, ''UD-3c Disposal Hole''; (4) 03-20-11, ''UD-3d Disposal Hole''; (5) 06-20-03, ''UD-6 and UD-6s Disposal Holes''; (6) 08-20-01, ''U-8d PS No.1A Injection Well Surface Release''; (7) 09-20-03, ''U-9itsy30 PS No.1A Injection Well Surface Release''; and (8) 20-20-02, ''U-20av PS No.1A Injection Well Surface Release''. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 30, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 542. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the CAI for CAU 542 includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling. (2) Conduct radiological surveys. (3) Conduct geophysical surveys to

  13. Buscando Hallaras. Que Bonito Es Leer, II. Libro II. Cuaderno de Ejercicios (Looking You Will Find. How Nice Reading Is, II. Book II. Workbook).

    Science.gov (United States)

    Dissemination and Assessment Center for Bilingual Education, Austin, TX.

    Designed for bilingual Spanish-English supplemental reading instruction for second grade students, this workbook is intended to be used with the reader of the same title. There is also a teacher's guide. The workbook provides about five pages of reinforcing exercises for each of the eight stories in the reader. The exercises are in the form of…

  14. Asi Aprendemos. Que Bonito Es Leer, II. Libro I. Cuaderno de Ejercicios (This Is How We Learn. How Nice Reading Is, II. Book I. Workbook).

    Science.gov (United States)

    Dissemination and Assessment Center for Bilingual Education, Austin, TX.

    This workbook is intended to be used in connection with the reader of the same title, for bilingual Spanish-English reading instruction in the second grade. It is further supplemented by a teacher's manual. As a follow-up to the stories contained in the reader, the workbook provides drawing games, word games, punctuation exercises, and other…

  15. Hombres y Lugares. Que Bonito Es Leer, II. Libro IV. Cuaderno de Ejercicios (Men and Places. How Nice Reading Is, II. Book IV. Workbook).

    Science.gov (United States)

    Dissemination and Assessment Center for Bilingual Education, Austin, TX.

    The exercises in the Spanish language workbook are intended to teach comprehension, interpretation, vocabulary, pronunciation, and study skills. The workbook provides one to five pages of reinforcement and follow-up work for each of the stories in the reader of the same title. Exercises stress sentence completion and construction, phonology,…

  16. The National Shipbuilding Research Program. United States Shipbuilding Standards Master Plan Update

    National Research Council Canada - National Science Library

    1997-01-01

    .... 7. Develop a marketing strategy for the plan. 8. Adopt or convert existing global standards for domestic use. This update includes an updated survey, the SP-6 tactical plan, new windows into standards on the internet, and more.

  17. Who, when, and how? Marine planning stakeholder involvement preferences--a case study of the Solent, United Kingdom.

    Science.gov (United States)

    Maguire, Bernadine; Potts, Jonathan; Fletcher, Stephen

    2011-11-01

    The introduction of a marine planning system throughout English territorial waters over the next decade provides an opportunity for stakeholder input to the management of the marine environment. Stakeholder involvement has been identified as an important component of successful development and subsequent implementation of marine planning but it has to be recognised that the views and interest of stakeholders can vary greatly, thus the desire for involvement with the process is unlikely to be uniform. This paper presents the views of stakeholders within the Solent, United Kingdom on their potential involvement with the marine planning process. Interestingly, it highlights a strong variability of views within and across sectors. Assuming the situation in the Solent is typical of groups of stakeholders throughout the country, the lack of uniformity in the potential involvement from different stakeholders may present a challenge in achieving a representative and truly collaborative marine planning process. Copyright © 2011 Elsevier Ltd. All rights reserved.

  18. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  19. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  20. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency's (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter

  1. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    1999-01-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document

  2. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  3. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  4. Proposed plan for the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-03-01

    The US Department of Energy (DOE) in compliance with Section 117(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, is releasing the proposed plan for remedial action at the United Nuclear Corporation (UNC) Disposal Site located at the DOE Oak Ridge Operations (ORO) Y-12 Plant, Oak Ridge, Tennessee. The purpose of this document is to present and solicit for comment to the public and all interested parties the ''preferred plan'' to remediate the UNC Disposal Site. However, comments on all alternatives are invited

  5. Engineering evaluation/conceptual plan for the 200-UP-1 Groundwater Operable Unit interim remedial measure. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (IRM) to address a uranium and technetium-99 groundwater plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need for an IRM and its potentially achievable objectives and goals. The report also evaluates alternatives to contain elevated concentrations of uranium and technetium-99 and to obtain information necessary to develop final remedial actions for the operable unit

  6. Design, Planning and Management of the Hospital Custody Unit at Hospital Universitario Fundación Alcorcón

    Directory of Open Access Journals (Sweden)

    C. de la Fuente-Martín

    Full Text Available Objective: The design and management of a Hospital Custody Unit at Hospital Universitario Fundación Alcorcón, to focus the aim of this study on specialized medical care for extra-penitentiary patients who have suffered from a disease. We are building a new space to facilitate their daily lives at hospital and we want to offer a double function to the patients that consists of a custody space and a health rehabilitation space. Material and methods: We carried out a scientific literature search on the international and national databases, about Hospital Custody Units or Restricted Access Units. The language of the reviews that we checked was English and Spanish. Results: We wrote the Action Guide of the Hospital Custody Unit for the design, planning and management of the Hospital Custody Unit at Hospital Universitario Fundación Alcorcón. (We included complementary bibliographic material and the Quick Guide in the Unit. Discussion: The Hospital Custody Unit will be compatible with medical activity, occupational safety and the custody of patients that are in prison. We thus require consensus with police departments about custody protocols along with assistance from the clinicians' teams at penitentiary centers and referral hospitals. Furthermore, it is important to step up special care for mental health and to promote telemedicine and new technologies to streamline medical care along with coordination with healthcare professionals.

  7. Next Generation Science Standards: Adoption and Implementation Workbook

    Science.gov (United States)

    Peltzman, Alissa; Rodriguez, Nick

    2013-01-01

    The Next Generation Science Standards (NGSS) represent the culmination of years of collaboration and effort by states, science educators and experts from across the United States. Based on the National Research Council's "A Framework for K-12 Science Education" and developed in partnership with 26 lead states, the NGSS, when…

  8. Matematica 2. Livro do Aluno (Mathematics 2. Student Workbook).

    Science.gov (United States)

    D'Alu, Maria Jose Miranda de Sousa

    This mathematics textbook, written in Portuguese, is designed for second graders. Developed from objectives set forth by the National Portuguese Materials Development Center, it follows closely the objectives and methodology of major curricula used in schools of the United States. The thirteen chapters deal with: numeration (0-999); addition with…

  9. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12

  10. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    2011-01-01

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation

  11. Family Planning Evaluation. Abortion Surveillance Report--Legal Abortions, United States, Annual Summary, 1970.

    Science.gov (United States)

    Center for Disease Control (DHEW/PHS), Atlanta, GA.

    This report summarizes abortion information received by the Center for Disease Control from collaborators in state health departments, hospitals, and other pertinent sources. While it is intended primarily for use by the above sources, it may also interest those responsible for family planning evaluation and hospital abortion planning. Information…

  12. Army Pacific Pathways: Comprehensive Assessment and Planning Needed to Capture Benefits Relative to Costs and Enhance Value for Participating Units

    Science.gov (United States)

    2016-11-01

    examines the extent to which the Army has (1) assessed the costs and benefits of Pacific Pathways; and (2) synchronized plans and incorporated ... costs . Such an analysis could both: • incorporate financial and non-financial costs and benefits of the initiative, to include readiness benefits for... logistics and sustainment units, any training efficiencies or cost avoidance resulting from Pacific Pathways, and non-financial costs , such as

  13. Instrumentation and control upgrade evaluation methodology: Final report. Volume 2: Workbook

    Energy Technology Data Exchange (ETDEWEB)

    Bliss, M.; Brown, E.; Florio, F.; Stofko, M.

    1996-07-01

    This workbook accompanies the methodology manual (EPRI TR-104963-V1) which describes how to develop an Upgrade Evaluation Report (UER). A UER is an evaluation that is performed by a nuclear power plant to decide the most cost-effective upgrade to perform (if any) for a previously identified Upgrade Candidate System. A UER defines the utility`s mission and objectives in regards to upgrade candidates, as well as the systems initial costs, benefits to each upgrade, and an initial upgrade schedule to cost-effectively implement system upgrades.

  14. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination

  15. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  16. Full Monte Carlo-Based Biologic Treatment Plan Optimization System for Intensity Modulated Carbon Ion Therapy on Graphics Processing Unit.

    Science.gov (United States)

    Qin, Nan; Shen, Chenyang; Tsai, Min-Yu; Pinto, Marco; Tian, Zhen; Dedes, Georgios; Pompos, Arnold; Jiang, Steve B; Parodi, Katia; Jia, Xun

    2018-01-01

    One of the major benefits of carbon ion therapy is enhanced biological effectiveness at the Bragg peak region. For intensity modulated carbon ion therapy (IMCT), it is desirable to use Monte Carlo (MC) methods to compute the properties of each pencil beam spot for treatment planning, because of their accuracy in modeling physics processes and estimating biological effects. We previously developed goCMC, a graphics processing unit (GPU)-oriented MC engine for carbon ion therapy. The purpose of the present study was to build a biological treatment plan optimization system using goCMC. The repair-misrepair-fixation model was implemented to compute the spatial distribution of linear-quadratic model parameters for each spot. A treatment plan optimization module was developed to minimize the difference between the prescribed and actual biological effect. We used a gradient-based algorithm to solve the optimization problem. The system was embedded in the Varian Eclipse treatment planning system under a client-server architecture to achieve a user-friendly planning environment. We tested the system with a 1-dimensional homogeneous water case and 3 3-dimensional patient cases. Our system generated treatment plans with biological spread-out Bragg peaks covering the targeted regions and sparing critical structures. Using 4 NVidia GTX 1080 GPUs, the total computation time, including spot simulation, optimization, and final dose calculation, was 0.6 hour for the prostate case (8282 spots), 0.2 hour for the pancreas case (3795 spots), and 0.3 hour for the brain case (6724 spots). The computation time was dominated by MC spot simulation. We built a biological treatment plan optimization system for IMCT that performs simulations using a fast MC engine, goCMC. To the best of our knowledge, this is the first time that full MC-based IMCT inverse planning has been achieved in a clinically viable time frame. Copyright © 2017 Elsevier Inc. All rights reserved.

  17. Optimal integrated sizing and planning of hubs with midsize/large CHP units considering reliability of supply

    International Nuclear Information System (INIS)

    Moradi, Saeed; Ghaffarpour, Reza; Ranjbar, Ali Mohammad; Mozaffari, Babak

    2017-01-01

    Highlights: • New hub planning formulation is proposed to exploit assets of midsize/large CHPs. • Linearization approaches are proposed for two-variable nonlinear CHP fuel function. • Efficient operation of addressed CHPs & hub devices at contingencies are considered. • Reliability-embedded integrated planning & sizing is formulated as one single MILP. • Noticeable results for costs & reliability-embedded planning due to mid/large CHPs. - Abstract: Use of multi-carrier energy systems and the energy hub concept has recently been a widespread trend worldwide. However, most of the related researches specialize in CHP systems with constant electricity/heat ratios and linear operating characteristics. In this paper, integrated energy hub planning and sizing is developed for the energy systems with mid-scale and large-scale CHP units, by taking their wide operating range into consideration. The proposed formulation is aimed at taking the best use of the beneficial degrees of freedom associated with these units for decreasing total costs and increasing reliability. High-accuracy piecewise linearization techniques with approximation errors of about 1% are introduced for the nonlinear two-dimensional CHP input-output function, making it possible to successfully integrate the CHP sizing. Efficient operation of CHP and the hub at contingencies is extracted via a new formulation, which is developed to be incorporated to the planning and sizing problem. Optimal operation, planning, sizing and contingency operation of hub components are integrated and formulated as a single comprehensive MILP problem. Results on a case study with midsize CHPs reveal a 33% reduction in total costs, and it is demonstrated that the proposed formulation ceases the need for additional components/capacities for increasing reliability of supply.

  18. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  19. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  20. 15 CFR 971.501 - Resource assessment, recovery plan, and logical mining unit.

    Science.gov (United States)

    2010-01-01

    ..., and logical mining unit. 971.501 Section 971.501 Commerce and Foreign Trade Regulations Relating to... COMMERCE GENERAL REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR... mining unit. (a) The applicant must submit with the application a resource assessment to provide a basis...

  1. Nuclear reactors: built, being built, or planned in the United States as of Dec 31, 1979

    International Nuclear Information System (INIS)

    1980-07-01

    Information is tabulated in nuclear reactor and critical assembly facilities in operation, shut down, under construction, or planned. The data include name, owner, location, type, power, and startup date

  2. Nuclear reactors built, being built, or planned in the United States as of June 30, 1980

    International Nuclear Information System (INIS)

    Goulden, A.M.

    1980-12-01

    Information is tabulated on nuclear reactor and critical assembly facilities in operation, shut down, under construction, or planned. The data included name, owner, location, type, power, and startup date

  3. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    International Nuclear Information System (INIS)

    1997-01-01

    This Environmental Monitoring Plan was prepared for the US Department of Energy's (DOE's) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan's purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner

  4. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    USDOE/NV

    1999-05-01

    The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document.

  5. Classic articles and workbook: EPRI monographs on simulation of electric power production

    International Nuclear Information System (INIS)

    Stremel, J.P.

    1991-12-01

    This monograph republishes several articles including a seminal one on probabilistic production costing for electric power generation. That article is given in the original French along with a English translation. Another article, written by R. Booth, gives a popular explanation of the theory, and a workbook by B. Manhire is included that carries through a simple example step by step. The classical analysis of non-probabilistic generator dispatch by L.K. Kirchmayer is republished along with an introductory essay by J.P. Stremel that puts in perspective the monograph material. The article in French was written by H. Baleriaux, E. Jamoulle, and Fr. Linard de Guertechin and first published in Brussels in 1967. It derived a method for calculating the expected value of production costs by modifying a load duration curve through the use of probability factors that account for unplanned random generator outages. Although the paper showed how pump storage plants could be included and how linear programming could be applied, the convolution technique used in the probabilistic calculations is the part most widely applied. The tutorial paper by Booth was written in a light style, and its lucidity helped popularize the method. The workbook by Manhire also shows how the calculation can be shortened significantly using cumulants to approximate the load duration curve

  6. Heat Transfer Reactor Experiment (HTRE)-3 Container Storage Unit Resource Conservation Recovery Act closure plan

    International Nuclear Information System (INIS)

    Spry, M.J.

    1992-11-01

    This document describes the closure of the HTRE-3 Container Storage Unit under the requirements of the Resource Conservation and Recovery Act. The unit's location, size, history, and current status are described. The document also summarizes the decontamination and decommissioning efforts performed in 1983 and provides an estimate of,waste residues remaining in the HTRE-3 assembly. A risk evaluation was performed that demonstrates that the residue does not pose a hazard to public health or the environment. Based on the risk evaluation, it is proposed that the HTRE-3 Container Storage Unit be closed in its present condition, without further decontamination or removal activities

  7. An Analysis of Writing Activities in the Student Workbooks of a Secondary-Level Turkish Language Course

    Science.gov (United States)

    Çerçi, Arif

    2016-01-01

    The purpose of this study is to analyze writing activities in the student workbooks of a secondary-level Turkish language course (grades 5 to 8) according to the principles of progressive writing. The study is descriptive and employs content analysis as a qualitative research paradigm. The writing activities of the books in this study all…

  8. Anger Management for Substance Abuse and Mental Health Clients: A Cognitive Behavioral Therapy Manual [and] Participant Workbook.

    Science.gov (United States)

    Reilly, Patrick M.; Shopshire, Michael S.; Durazzo, Timothy C.; Campbell, Torri A.

    This manual and workbook set focuses on anger management. The manual was designed for use by qualified substance abuse and mental health clinicians who work with substance abuse and mental health clients with concurrent anger programs. The manual describes a 12-week cognitive behavioral anger management group treatment. Each of the 12 90-minute…

  9. The Story of California. Student Workbook. Teacher's Edition = Libro de Trabajo de La Historia de California. Edicion del Maestro.

    Science.gov (United States)

    Gray (Naomi) Associates, Inc., San Francisco, CA.

    The workbook is designed to accompany a textbook, "The Story of California," a Spanish-English bilingual history and geography of the state intended for classroom use by limited-English-proficient, native Spanish-speaking students in California's urban middle schools. The teacher's edition, presented here, consists of reproductions of 51…

  10. The GLSEN Workbook: A Development Model for Assessing, Describing and Improving Schools for Lesbian, Gay, Bisexual and Transgender (LGBT) People.

    Science.gov (United States)

    Gay, Lesbian, and Straight Education Network, New York, NY.

    This workbook provides an instrument to objectively analyze a school's current climate with regard to lesbian, gay, bisexual, and transgendered (LGBT) people and the steps needed to move that school toward a more inclusive environment. It provides a detailed assessment survey (to be completed by key school stakeholders), descriptive data, and…

  11. History through Art and Architecture: The Art and Architecture of the Maya. Teacher's Manual [and] Creative Workbook.

    Science.gov (United States)

    Campbell, Ann; Hoag, John, Ed.

    This packet--a teacher's manual, student workbook, and color poster--was designed to accompany a 2-part videotape program. The teacher's manual provides a script of the videotape, and is organized in 2 sections. Part 1, "Kings, Glyphs, Temples and Ball Courts", looks at the written glyph language and the Solar and Ritual calendars of the…

  12. Strategic environmental assessment (SEA) for wind energy planning: Lessons from the United Kingdom and Germany

    Energy Technology Data Exchange (ETDEWEB)

    Phylip-Jones, J., E-mail: jonesjp@liverpool.ac.uk; Fischer, T.B., E-mail: fischer@liv.ac.uk

    2015-01-15

    This paper reports on SEA applied in the wind energy sector in the UK and Germany. Based on a review of 18 SEAs, it is found that the quality of SEA documentation is variable, with over a third of them being deemed unsatisfactory. Furthermore, SEA processes are conducted to varying degrees of effectiveness, with scoping a strength but impact prediction and mitigation weaknesses. Generally speaking, the influence of SEA on German wind energy plan making was found to be low and the influence of SEA on UK plans deemed to be moderate. The German plans had a low influence mainly because of a perceived high environmental performance of the underlying plans in the first instance. Substantive outcomes of SEA are not always clear and the influence of SEA on decision making is said to be limited in many cases. Finally, a lack of effective tiering between SEA and project level EIA is also observed. In addition, our findings echo some of the weaknesses of SEA practice found in previous studies of SEA effectiveness, including poor impact prediction and significance sections and a lack of detailed monitoring programmes for post plan implementation.

  13. 77 FR 64414 - Approval and Promulgation of Air Quality Implementation Plans; United States Virgin Islands...

    Science.gov (United States)

    2012-10-22

    ... deciviews (the Reasonable Progress Goal). Comment: HOVENSA commented that EPA has no rational basis for..., petitions for judicial review of this action must be filed in the United States Court of Appeals for the...

  14. STRATEGIC BUSINESS UNIT – THE CENTRAL ELEMENT OF THE BUSINESS PORTFOLIO STRATEGIC PLANNING PROCESS

    OpenAIRE

    FLORIN TUDOR IONESCU

    2011-01-01

    Over time, due to changes in the marketing environment, generated by the tightening competition, technological, social and political pressures the companies have adopted a new approach, by which the potential businesses began to be treated as strategic business units. A strategic business unit can be considered a part of a company, a product line within a division, and sometimes a single product or brand. From a strategic perspective, the diversified companies represent a collection of busine...

  15. TracerLPM (Version 1): An Excel® workbook for interpreting groundwater age distributions from environmental tracer data

    Science.gov (United States)

    Jurgens, Bryant C.; Böhlke, J.K.; Eberts, Sandra M.

    2012-01-01

    TracerLPM is an interactive Excel® (2007 or later) workbook program for evaluating groundwater age distributions from environmental tracer data by using lumped parameter models (LPMs). Lumped parameter models are mathematical models of transport based on simplified aquifer geometry and flow configurations that account for effects of hydrodynamic dispersion or mixing within the aquifer, well bore, or discharge area. Five primary LPMs are included in the workbook: piston-flow model (PFM), exponential mixing model (EMM), exponential piston-flow model (EPM), partial exponential model (PEM), and dispersion model (DM). Binary mixing models (BMM) can be created by combining primary LPMs in various combinations. Travel time through the unsaturated zone can be included as an additional parameter. TracerLPM also allows users to enter age distributions determined from other methods, such as particle tracking results from numerical groundwater-flow models or from other LPMs not included in this program. Tracers of both young groundwater (anthropogenic atmospheric gases and isotopic substances indicating post-1940s recharge) and much older groundwater (carbon-14 and helium-4) can be interpreted simultaneously so that estimates of the groundwater age distribution for samples with a wide range of ages can be constrained. TracerLPM is organized to permit a comprehensive interpretive approach consisting of hydrogeologic conceptualization, visual examination of data and models, and best-fit parameter estimation. Groundwater age distributions can be evaluated by comparing measured and modeled tracer concentrations in two ways: (1) multiple tracers analyzed simultaneously can be evaluated against each other for concordance with modeled concentrations (tracer-tracer application) or (2) tracer time-series data can be evaluated for concordance with modeled trends (tracer-time application). Groundwater-age estimates can also be obtained for samples with a single tracer measurement at one

  16. Floristic units and their predictors unveiled in part of the Atlantic Forest hotspot: implications for conservation planning

    Directory of Open Access Journals (Sweden)

    FELIPE Z. SAITER

    2015-12-01

    Full Text Available ABSTRACT We submitted tree species occurrence and geoclimatic data from 59 sites in a river basin in the Atlantic Forest of southeastern Brazil to ordination, ANOVA, and cluster analyses with the goals of investigating the causes of phytogeographic patterns and determining whether the six recognized subregions represent distinct floristic units. We found that both climate and space were significantly (p ≤ 0.05 important in the explanation of phytogeographic patterns. Floristic variations follow thermal gradients linked to elevation in both coastal and inland subregions. A gradient of precipitation seasonality was found to be related to floristic variation up to 100 km inland from the ocean. The temperature of the warmest quarter and the precipitation during the coldest quarter were the main predictors. The subregions Sandy Coastal Plain, Coastal Lowland, Coastal Highland, and Central Depression were recognized as distinct floristic units. Significant differences were not found between the Inland Highland and the Espinhaço Range, indicating that these subregions should compose a single floristic unit encompassing all interior highlands. Because of their ecological peculiarities, the ferric outcrops within the Espinhaço Range may constitute a special unit. The floristic units proposed here will provide important information for wiser conservation planning in the Atlantic Forest hotspot.

  17. Floristic units and their predictors unveiled in part of the Atlantic Forest hotspot: implications for conservation planning.

    Science.gov (United States)

    Saiter, Felipe Z; Eisenlohr, Pedro V; França, Glauco S; Stehmann, João R; Thomas, William W; De Oliveira-Filho, Ary T

    2015-01-01

    We submitted tree species occurrence and geoclimatic data from 59 sites in a river basin in the Atlantic Forest of southeastern Brazil to ordination, ANOVA, and cluster analyses with the goals of investigating the causes of phytogeographic patterns and determining whether the six recognized subregions represent distinct floristic units. We found that both climate and space were significantly (p ≤ 0.05) important in the explanation of phytogeographic patterns. Floristic variations follow thermal gradients linked to elevation in both coastal and inland subregions. A gradient of precipitation seasonality was found to be related to floristic variation up to 100 km inland from the ocean. The temperature of the warmest quarter and the precipitation during the coldest quarter were the main predictors. The subregions Sandy Coastal Plain, Coastal Lowland, Coastal Highland, and Central Depression were recognized as distinct floristic units. Significant differences were not found between the Inland Highland and the Espinhaço Range, indicating that these subregions should compose a single floristic unit encompassing all interior highlands. Because of their ecological peculiarities, the ferric outcrops within the Espinhaço Range may constitute a special unit. The floristic units proposed here will provide important information for wiser conservation planning in the Atlantic Forest hotspot.

  18. Evaluation according to criteria and indicators of sustainable forest management: Saçinka Forest Planning Unit

    Directory of Open Access Journals (Sweden)

    Burak Çavdar

    2015-04-01

    Full Text Available The reasons such as; decrease in forest areas, deterioration in the structure, fragmented structures, decrease in water sources, environmental pollution and increase in carbon level in air are considered as the main sources of problems like global warming and global climate change. Countries have been trying to develop cooperative solutions for these problems since the mid-20th century. Sustainable forest management criteria and indicators, which were outcomes of Biological Diversity Agreement and the processes afterwards, have also been specified in Turkey based on Pan-European process indicators. According to this set of criteria and indicators, data are collected in the scale of Forest Enterprises and the current situation is evaluated in the meetings held by Regional Directorates of Forestry. Most of the data to be evaluated are obtained from forest management plans in the scale of Forest Planning Units and a great deal of economic indicators are dealt in the scale of Forestry Enterprises. Starting from this point of view; this study analyzes the SFM criteria and indicators set data of Saçinka Forest Planning Unit. Accordingly, it examines whether forest ecosystem is conducted in a sustainable way or not.

  19. Unplanned versus planned extubation in respiratory intensive care unit, predictors of outcome

    Directory of Open Access Journals (Sweden)

    Mohammed F. Ismaeil

    2014-01-01

    Conclusions: An increase in severity of illness on ICU admission, agitation, less use of sedation with lower Ramsay score during MV intensify the risk of unplanned extubation, which usually occurs during the night shift, even with the use of physical restraints. Unplanned extubation is associated with an increased incidence of failed extubation (especially with accidental extubation and mortality. Factors affecting airway competence; magnitude of cough on command and abundant amount of E/T secretions are significant predictors of extubation failure in planned and unplanned extubation. Prolonged minute ventilation recovery time, failed DSA test and lower swallowing score are associated with an increased risk of failed planned extubation.

  20. Successful business process design. Business plan development for the occupational health services unit.

    Science.gov (United States)

    Kalina, C M; Fitko, J

    1997-02-01

    1. The occupational health nurse is often mandated by management to validate health services offered and programs developed for employees as valuable to the business and company mission. 2. The business plan of the occupational health service is a working document, changing as needs of the client/customer and internal and external business and socio-economic environment evolve. 3. Alignment with and support of the company mission, goals, and objectives is another method of proving good occupational health is good business. 4. Business planning is a basic business tool the wise and prudent occupational health nurse can use in proving good occupational health is vital to the success of a company.

  1. 78 FR 18947 - Fisheries of the Northeastern United States; Tilefish Fishery Management Plan; Regulatory...

    Science.gov (United States)

    2013-03-28

    ... during the current fishing year for failure to pay the cost recovery fee, rather than not renewing the... an IFQ cost recovery fee as described in paragraph (h)(4) of this section; or any other failure to... Plan; Regulatory Amendment, Corrections, and Clarifications AGENCY: National Marine Fisheries Service...

  2. The Promise of Defined-Ambition Plans : Lessons for the United States

    NARCIS (Netherlands)

    Bovenberg, A.L.; Mehlkopf, R.J.; Nijman, T.E.

    This paper explores proposals for defined-ambition plans in Dutch occupational pensions. Firms no longer act as external risk sponsors but continue to provide a distributional platform for pensions, thereby addressing behavioral and agency issues as well as imperfections of insurance and financial

  3. The promise of defined-ambition plans : Lessons for the United States

    NARCIS (Netherlands)

    Bovenberg, A.L.; Mehlkopf, R.J.; Nijman, T.E.; Mitchell, O.S.; Shea, R.

    2016-01-01

    This paper explores proposals for defined-ambition plans in Dutch occupational pensions. Firms no longer act as external risk sponsors but continue to provide a distributional platform for pensions, thereby addressing behavioral and agency issues as well as imperfections of insurance and financial

  4. Planning for Preeminence: Perceptions of Prestige in Catholic Universities of the Western United States

    Science.gov (United States)

    Cifone, Rocco John

    2013-01-01

    The purpose of this study was to determine what effect the perception of an institution's prestige has on strategic planning undertaken by American Catholic colleges and universities and whether these schools engage in purposeful and effective positioning of themselves in the market. The study considered efforts to achieve preeminence amongst…

  5. Challenges to the Aarhus Convention: Public Participation in the Energy Planning Process in the United Kingdom

    Directory of Open Access Journals (Sweden)

    Raphael Heffron

    2014-05-01

    Full Text Available This article examines the tension between the democratic right of public participation on specific environmental issues, guaranteed by European Law, and the degree to which it is being challenged in the UK as a consequence of recent approaches to energy infrastructure planning. Recent trends in UK government policy frameworks seem both to threaten effective public participation and challenge EU planning strategy, in particular those outlined in the Aarhus convention. The research outlined in this study involves an assessment of the changing context of planning and energy policy, in addition to recent changes in legislation formulation in the UK. The research findings, derived from an extensive interview process of elite stakeholders engaged in policy and legislation formulation in the UK and the EU provide a new categorisation system of stakeholders in energy policy that can be utilised in future research. The article concludes with a second order analysis of the interviewee data and provides solutions to increase public participation in the planning of energy infrastructure that emerge from the different perspectives.

  6. Planning intensive care unit design using computer simulation modeling: optimizing integration of clinical, operational, and architectural requirements.

    Science.gov (United States)

    OʼHara, Susan

    2014-01-01

    Nurses have increasingly been regarded as critical members of the planning team as architects recognize their knowledge and value. But the nurses' role as knowledge experts can be expanded to leading efforts to integrate the clinical, operational, and architectural expertise through simulation modeling. Simulation modeling allows for the optimal merge of multifactorial data to understand the current state of the intensive care unit and predict future states. Nurses can champion the simulation modeling process and reap the benefits of a cost-effective way to test new designs, processes, staffing models, and future programming trends prior to implementation. Simulation modeling is an evidence-based planning approach, a standard, for integrating the sciences with real client data, to offer solutions for improving patient care.

  7. FACILITIES PLANNING WORKSHOP FOR BLASTING SUPPORT THE ACTIVITY OF DEVELOPMENT AND REPAIR SHIP IN PT. JASA MARINA INDAH UNIT II

    Directory of Open Access Journals (Sweden)

    Samuel Samuel

    2012-07-01

    Full Text Available Blasting in the process of planning the workshop production of new building and ship repair to play a role in providing blasting and paint on the block that will be of erection. As a result of blasting workshop facilities that do not have resulted in low production capacity that can be achieved by this workshop, namely three block ships per month. Capacity blasting and paint shop in this low resulted in low productivity process stage (stage the previous workshops which of course result in a decrease in vessel productivity in general.                 In penelitiaan aims to plan for blasting and paint shop facility which has been adjusted to the planned production capacity of PT. JASA MARINA INDAH II units.                 In this study it - thing to note is to understand the data - the data field for research conducted in terms of both technical and economic terms, with the blasting and paint shop facilities on the construction or repair of ships that have been planned, then the effectiveness of the work and production flow at. Jasa Marina Indah II units can be known.                 Based on the analysis and calculation of both technical and economical it can be identified by the workshop on the process of blasting Blasting efficiency is obtained for 2.55 hours, at 10.16 hours during the painting process, while economical in terms of labor costs can be reduced blasting cost is Rp.930000    for          paint       and         Rp.1.23million

  8. An unit cost adjusting heuristic algorithm for the integrated planning and scheduling of a two-stage supply chain

    Directory of Open Access Journals (Sweden)

    Jianhua Wang

    2014-10-01

    Full Text Available Purpose: The stable relationship of one-supplier-one-customer is replaced by a dynamic relationship of multi-supplier-multi-customer in current market gradually, and efficient scheduling techniques are important tools of the dynamic supply chain relationship establishing process. This paper studies the optimization of the integrated planning and scheduling problem of a two-stage supply chain with multiple manufacturers and multiple retailers to obtain a minimum supply chain operating cost, whose manufacturers have different production capacities, holding and producing cost rates, transportation costs to retailers.Design/methodology/approach: As a complex task allocation and scheduling problem, this paper sets up an INLP model for it and designs a Unit Cost Adjusting (UCA heuristic algorithm that adjust the suppliers’ supplying quantity according to their unit costs step by step to solve the model.Findings: Relying on the contrasting analysis between the UCA and the Lingo solvers for optimizing many numerical experiments, results show that the INLP model and the UCA algorithm can obtain its near optimal solution of the two-stage supply chain’s planning and scheduling problem within very short CPU time.Research limitations/implications: The proposed UCA heuristic can easily help managers to optimizing the two-stage supply chain scheduling problems which doesn’t include the delivery time and batch of orders. For two-stage supply chains are the most common form of actual commercial relationships, so to make some modification and study on the UCA heuristic should be able to optimize the integrated planning and scheduling problems of a supply chain with more reality constraints.Originality/value: This research proposes an innovative UCA heuristic for optimizing the integrated planning and scheduling problem of two-stage supply chains with the constraints of suppliers’ production capacity and the orders’ delivering time, and has a great

  9. 200-BP-11 operable unit and 216-B-3 main pond work/closure plan, Hanford Site, Richland, Washington. Volume 1: Field investigation and sampling strategy

    International Nuclear Information System (INIS)

    1994-09-01

    This document coordinates a Resource Conservation and Recovery Act (RCRA) past-practice work plan for the 200-BP-11 Operable Unit and a RCRA closure/postclosure plan for the 216-B-3 Main Pond and 216-B-3-3 Ditch [treatment, storage, and/or disposal (TSD) unit]. Both RCRA TSD and past-practice waste management units are contained within the 200-BP-11 Operable Unit. The 200-BP-11 Operable Unit is a source operable unit located on the east side of the B Plant Source Aggregate Area in the 200 East Area of the Hanford Site. The operable unit lies just east of the 200 East Area perimeter fence and encompass approximately 476 hectares (1,175 acres). Source operable units include waste management units that are potential sources of radioactive and/or hazardous substance contamination. Source waste management units are categorized in the Hanford Federal Facility Agreement and Consent Order as either RCRA TSD, RCRA past-practice, or Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) past-practice. As listed below and in the Tri-Party Agreement, the 200-BP-11 Operable Unit contains five RCRA past-practice and five RCRA TSD waste management units. Additionally, for RCRA TSD permitting purposes, the RCRA TSD waste management units are subdivided into two RCRA TSD units

  10. Closure Plan for Corrective Action Unit 110: Area 3 RWMS U-3ax/bl Disposal Unit, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Fitzmaurice, T. M.

    2000-01-01

    This Closure Plan has been prepared for the Area 3 RWMS U-3ax/bl Disposal Unit Corrective Action Unit 110 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). The U-3ax/bl is a historic disposal unit within the Area 3 Radioactive Waste Management Site located on the Nevada Test Site (NTS). The unit, which was formed by excavating the area between two subsidence craters (U-3ax and U-3bl), was operationally closed in 1987. The U-3ax/bl disposal unit is scheduled for permanent closure under the Resource Conservation and Recovery Act as a hazardous waste landfill. Existing records indicate that, from July 1968 to December 1987, U-3ax/bl received 2.3 x 10 5 cubic meters (8.12 x 10 6 cubic feet) of waste. NTS nuclear device testing generated approximately 95 percent of the total volume disposed of in U-3ax/bl, the majority of which came from the Waste Consolidation Project (80 percent of the total volume) (Elletson and Johnejack, 1995). Area 3 is located in Yucca Flat, within the northeast quadrant of the NTS. The Yucca Flat watershed is a structurally closed basin encompassing an area of approximately 780 square kilometers (300 square miles). The structural geomorphology of Yucca Flat is typical of the Basin and Range Physiographic Province. Yucca Flat lies in one of the most arid regions of the country. Water balance calculations for Area 3 indicate that it is continuously in a state of moisture deficit. The U-3ax/bl Disposal Unit will be closed in place by installing a Resource Conservation and Recovery Act equivalent cover. Following cover construction a fence will be installed around the cover to prevent accidental damage to the cover. Post-closure monitoring will consist of site inspections to determine the condition of the engineered cover and cover performance monitoring using Time-Domain Reflectometry arrays to monitor moisture migration in the cover. Any identified maintenance and repair

  11. Closure Plan for Corrective Action Unit 110: Area 3 RWMS U-3ax/bl Disposal Unit, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-08-01

    This Closure Plan has been prepared for the Area 3 RWMS U-3ax/bl Disposal Unit Corrective Action Unit 110 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). The U-3ax/bl is a historic disposal unit within the Area 3 Radioactive Waste Management Site located on the Nevada Test Site (NTS). The unit, which was formed by excavating the area between two subsidence craters (U-3ax and U-3bl), was operationally closed in 1987. The U-3ax/bl disposal unit is scheduled for permanent closure under the Resource Conservation and Recovery Act as a hazardous waste landfill. Existing records indicate that, from July 1968 to December 1987, U-3ax/bl received 2.3 x 10{sup 5} cubic meters (8.12 x 10{sup 6} cubic feet) of waste. NTS nuclear device testing generated approximately 95 percent of the total volume disposed of in U-3ax/bl, the majority of which came from the Waste Consolidation Project (80 percent of the total volume) (Elletson and Johnejack, 1995). Area 3 is located in Yucca Flat, within the northeast quadrant of the NTS. The Yucca Flat watershed is a structurally closed basin encompassing an area of approximately 780 square kilometers (300 square miles). The structural geomorphology of Yucca Flat is typical of the Basin and Range Physiographic Province. Yucca Flat lies in one of the most arid regions of the country. Water balance calculations for Area 3 indicate that it is continuously in a state of moisture deficit. The U-3ax/bl Disposal Unit will be closed in place by installing a Resource Conservation and Recovery Act equivalent cover. Following cover construction a fence will be installed around the cover to prevent accidental damage to the cover. Post-closure monitoring will consist of site inspections to determine the condition of the engineered cover and cover performance monitoring using Time-Domain Reflectometry arrays to monitor moisture migration in the cover. Any identified maintenance and

  12. Subsurface Interim Measures/Interim Remedial Action Plan/ Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This volume contains five appendices

  13. Treatment/Disposal Plan for Drummed Waste from the 300-FF-1 Operable Unit, 618-4 Burial Ground

    International Nuclear Information System (INIS)

    Lerch, J.A.

    1999-01-01

    The objective of this plan is to support selection of a safe, environmentally responsible, and cost-effective treatment and disposal method for drums containing depleted uranium metal chips submerged in oil that have been and will be excavated from the 618-4 Burial Ground. Remediation of the 300-FF-1 Operable Unit, 618-4 Burial Ground was initiated in fiscal year (FY) 1998 as an excavation and removal operation. Routine processes were established to excavate and ship contaminated soil and debris to the Environmental Restoration Disposal Facility (ERDF) for disposal

  14. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

  15. Record of Technical Change No.2 for ''Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada''

    International Nuclear Information System (INIS)

    1999-01-01

    This Record of Technical Change provides updates to the technical information included in ''Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada.''

  16. The numeracy test workbook everything you need for a successful programme of self study including quick tests and full-length realistic mock-ups

    CERN Document Server

    Bryon, Mike

    2011-01-01

    One of the most common types of psychometric test used in assessment and selection procedures, The Numeracy Test Workbook provides practice questions and mock tests designed to build confidence and improve performance.

  17. Need for Subsidized Family Planning Services: United States, Each State and County, 1968.

    Science.gov (United States)

    Planned Parenthood--World Population, New York, NY.

    To provide federal, state, and local health agencies with information needed to achieve the national objectives of improving health, assisting families to escape poverty, and providing parents with freedom of choice in determining the number and spacing of their children, information was collected from 3,072 United States counties. Data from a…

  18. Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This document provides the Environmental Restoration Program with information about the erosion and sediment control, storm water management, maintenance, and reporting and record keeping practices to be employed during Phase II of the remediation project for the Lower East Fork Poplar Creek (LEFPC) Operable Unit

  19. Plans for characterization of salt sites in the United States of America

    International Nuclear Information System (INIS)

    Heim, G.E.; Matthews, S.C.; Kircher, J.F.; Kennedy, R.K.

    1984-02-01

    The characterization plans presented in this paper are considered to be basic in nature and are the minimum program that meets project needs. The proposed basic program can be applied to any of the salt sites under consideration. It has been designed to provide the data required to support the design, performance assessment, and licensing of each of the principal project elements: the repository, the shafts, and the surface facilities. The work has been sequenced to meet the design and licensing schedule. It is anticipated that additional characterization activities will be performed to address site-specific considerations and to provide additional information to address questions which arise during the evaluation of characterization data. The information obtained during the characterization program will be incorporated into: the site characterization plan, the site recommendation report, the environmental impact statement, and the construction authorization application

  20. 77 FR 71129 - Revisions to the California State Implementation Plan, San Joaquin Valley United Air Pollution...

    Science.gov (United States)

    2012-11-29

    ...EPA is finalizing approval of revisions to the SJVUAPCD and SCAQMD portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on June 21, 2012 and concerns volatile organic compound (VOC) emissions from chipping and grinding activities, and composting operations. We are approving local rules that regulate these emission sources under the Clean Air Act (CAA or the Act).

  1. Effect on treatment planning based on properties of Cobalt-60 stereotactic radiosurgery units

    International Nuclear Information System (INIS)

    Nakazawa, Hisato; Komori, Masataka; Uchiyama, Yukio; Hagiwara, Masahiro; Hayashi, Naoki

    2014-01-01

    The brand-new version of gamma knife, Perfexion, is equipped with an automatic collimator arrangement system that does not require manual collimator exchange and a couch-traveling system that is approximately ten times faster than Model C, so treatment time with multiple shots is assumed to remain within a clinically acceptable range. In this study, the treatment plans for Model C and Perfexion were compared from the viewpoint of number of shots, coverage, selectivity, conformity, and gradient in planning target volume (PTV) coverage. We enrolled 187 and 89 patients with vestibular schwannomas treated by Model C and Perfexion in the study. Treatment planning was created on a Leksell GammaPlan workstation. The mean PTV was 5.2 ml (range 0.1-18.4 ml) in Model C and 4.1 ml (range 0.1-32.1 ml) in Perfexion. The mean shot number for Model C and Perfexion was 11 (range 2-27) and 16 (range 1-41) at the isodose contour of 40-60%, respectively. The mean PTV coverage was 94% (range 73-100%) and 98% (range 91-100%), and the mean PTV selectivity was 83% (range 46-98%) and 87% (range 63-97%) for Model C and Perfexion, respectively. The mean conformity index was 1.15 (range 0.81-2.02) and 1.14 (range 0.97-1.57), and the mean gradient index was 2.82 (range 2.37-3.35) and 2.91 (range 2.55-4.48) for Model C and Perfexion, respectively. In Perfexion, better PTV coverage and selectivity were achieved by using an excessively large number of shots. In addition, the use of a small collimator in Perfexion produced a steeper dose gradient. Our comparative research demonstrated the greater clinical usefulness of Perfexion. (author)

  2. The impact of race and ethnicity on receipt of family planning services in the United States.

    Science.gov (United States)

    Borrero, Sonya; Schwarz, Eleanor B; Creinin, Mitchell; Ibrahim, Said

    2009-01-01

    This study sought to examine the independent effect of patient race or ethnicity on the use of family planning services and on the likelihood of receiving counseling for sterilization and other birth control methods. This study used national, cross-sectional data collected by the 2002 National Survey of Family Growth (NSFG). Our analysis included women aged 18-44 years who had heterosexual intercourse within the past 12 months, who were not actively seeking to get pregnant, and who had not undergone surgical sterilization. The primary outcome was receipt of family planning services within the past 12 months. Specific services we examined were (1) provision of or prescription for a method of birth control, (2) checkup related to using birth control, (3) counseling about sterilization, and (4) counseling about birth control. Although we found no racial/ethnic differences in the overall use of family planning services, there were racial/ethnic differences in the specific type of service received. Hispanic and black women were more likely than white women to receive counseling for birth control (adjusted OR 1.5, 95% confidence interval [CI] 1.2, 1.8, and adjusted OR 1.3, 95% CI 1.1, 1.7, respectively). Hispanic women were more likely than white women to report having been counseled about sterilization (adjusted OR 1.5, 95% CI 1.0, 2.3). Minority women were more likely to receive counseling about sterilization and other birth control methods. However, there were no differences in access to family planning services by race or ethnicity. Future studies are needed to examine the quality and content of contraceptive counseling received by minority compared with nonminority women.

  3. Sampling and decontamination plan for the Transuranic Storage Area--1/-R container storage unit

    International Nuclear Information System (INIS)

    Barry, G.A.

    1992-11-01

    This document describes the sampling and decontamination of the Transuranic Storage Area (TSA)-l/-R container storage area and the earthen-covered portion of the TSA-2 container storage unit at the Radioactive Waste Management Complex. Stored containers from the earthen-covered asphalt pads will be retrieved from the TSA-l/-R and TSA-2 container storage units. Container retrieval will be conducted under the TSA retrieval enclosure, a fabricated steel building to be constructed over the earthen-covered pad to provide containment and weather protection. Following container retrieval, the TSA retrieval enclosure will be decontaminated to remove radioactive and hazardous contamination. The underlying soils will be sampled and analyzed to determine whether any contaminated soils require removal

  4. SU-E-J-70: Feasibility Study of Dynamic Arc and IMRT Treatment Plans Utilizing Vero Treatment Unit and IPlan Planning Computer for SRS/FSRT Brain Cancer Patients

    International Nuclear Information System (INIS)

    Huh, S; Lee, S; Dagan, R; Malyapa, R; Mendenhall, N; Mendenhall, W; Ho, M; Hough, D; Yam, M; Li, Z

    2014-01-01

    Purpose: To investigate the feasibility of utilizing Dynamic Arc (DA) and IMRT with 5mm MLC leaf of VERO treatment unit for SRS/FSRT brain cancer patients with non-invasive stereotactic treatments. The DA and IMRT plans using the VERO unit (BrainLab Inc, USA) are compared with cone-based planning and proton plans to evaluate their dosimetric advantages. Methods: The Vero treatment has unique features like no rotational or translational movements of the table during treatments, Dynamic Arc/IMRT, tracking of IR markers, limitation of Ring rotation. Accuracies of the image fusions using CBCT, orthogonal x-rays, and CT are evaluated less than ∼ 0.7mm with a custom-made target phantom with 18 hidden targets. 1mm margin is given to GTV to determine PTV for planning constraints considering all the uncertainties of planning computer and mechanical uncertainties of the treatment unit. Also, double-scattering proton plans with 6F to 9F beams and typical clinical parameters, multiple isocenter plans with 6 to 21 isocenters, and DA/IMRT plans are evaluated to investigate the dosimetric advantages of the DA/IMRT for complex shape of targets. Results: 3 Groups of the patients are divided: (1) Group A (complex target shape), CI's are same for IMRT, and DGI of the proton plan are better by 9.5% than that of the IMRT, (2) Group B, CI of the DA plans (1.91+/−0.4) are better than cone-based plan, while DGI of the DA plan is 4.60+/−1.1 is better than cone-based plan (5.32+/−1.4), (3) Group C (small spherical targets), CI of the DA and cone-based plans are almost the same. Conclusion: For small spherical targets, cone-based plans are superior to other 2 plans: DS proton and DA plans. For complex or irregular plans, dynamic and IMRT plans are comparable to cone-based and proton plans for complex targets

  5. The International Commission on Radiation Units and Measurement (ICRU): activities and future plans

    International Nuclear Information System (INIS)

    Wambersie, A.; DeLuca, P.M.; Caswell, R.S.; Menzel, H.G.

    2000-01-01

    The main objective of the ICRU is to develop a universally accepted set of quantities and units for the different applications of radiations in medicine, protection, research and industry. Absorbed dose was introduced by the ICRU in 1953 as the fundamental quantity correlated to the biological effect. This quantity (with its special unit gray, initially rad) is found to be most useful for the majority of applications and is university accepted. However some limitations in the concept of absorbed dose have been recently identified, in particular when the conditions for the 'averaging procedure' implied in the concept are no longer met. This issue is now studied very carefully by the ICRU. In 1962, the ICRU introduced the quantity dose equivalent for radiation protection purposes (with its special unit sievert, initially rem). In 1985, it developed operational quantities for the specification of dose equivalent for area monitoring in the case of external radiation sources. Besides its efforts in the development of concepts and quantities, the ICRU has always played an important role in providing guidance for measurements in the field of radiation protection. Increased focus on guidance for specific measurement procedures and techniques will further harmonize the approaches and improve the reliability of results. Contribution of the ICRU in radiation protection was achieved in collaboration with the ICRP. As an example, Report on 'Conversion coefficients for use in radiological protection against external radiation' is the result of such collaboration and has been published in the report series of both Commissions (1997, 1998). (author)

  6. Primary phonological planning units in spoken word production are language-specific: Evidence from an ERP study.

    Science.gov (United States)

    Wang, Jie; Wong, Andus Wing-Kuen; Wang, Suiping; Chen, Hsuan-Chih

    2017-07-19

    It is widely acknowledged in Germanic languages that segments are the primary planning units at the phonological encoding stage of spoken word production. Mixed results, however, have been found in Chinese, and it is still unclear what roles syllables and segments play in planning Chinese spoken word production. In the current study, participants were asked to first prepare and later produce disyllabic Mandarin words upon picture prompts and a response cue while electroencephalogram (EEG) signals were recorded. Each two consecutive pictures implicitly formed a pair of prime and target, whose names shared the same word-initial atonal syllable or the same word-initial segments, or were unrelated in the control conditions. Only syllable repetition induced significant effects on event-related brain potentials (ERPs) after target onset: a widely distributed positivity in the 200- to 400-ms interval and an anterior positivity in the 400- to 600-ms interval. We interpret these to reflect syllable-size representations at the phonological encoding and phonetic encoding stages. Our results provide the first electrophysiological evidence for the distinct role of syllables in producing Mandarin spoken words, supporting a language specificity hypothesis about the primary phonological units in spoken word production.

  7. Standards and general criteria for the planning and certification of need of megavoltage radiation oncology units in health care facilities

    International Nuclear Information System (INIS)

    1977-01-01

    Minimum standards and guidelines to be applied by State agencies and New Jersey health systems agencies in the examination of certificate-of-need applications and in the development of planning activities for radiation oncology units in health care facilities are presented. Radiation oncology is a medical discipline devoted to education and research in the use of ionizing radiation for the treatment of neoplastic disease. The proper application of radiation can be directed at either curative or palliative intent. It is an important and effective technique for the management of cancer. Radiotherapy equipment in clinical use is divided into four main categories: superficial, orthovoltage, megavoltage, and treatment planning facilities. Particular attention is given to megavoltage equipment which emits or generates rays over 1,000 kilovolts. These high energy rays effect better penetration of human tissue and are skin-sparing in nature, thus allowing for better tumor-to- skin dose ratios. The regionalization of megavoltage therapy services is discussed. Data on hospital megavoltage facilities in New Jersey for 1974, 1975, and 1976 are provided. The standards and guidelines pertain to utilization, personnel, and general criteria. A form for use by megavoltage radiation therapy units is appended

  8. Proceedings of a Coastal and Marine Spatial Planning Workshop for the Western United States

    Science.gov (United States)

    Thorsteinson, Lyman; Hirsch, Derrick; Helweg, David; Dhanju, Amardeep; Barmenski, Joan; Ferrero, Richard

    2011-01-01

    Recent scientific and ocean policy assessments demonstrate that a fundamental change in our current management system is required to achieve the long-term health of our ocean, coasts, and Great Lakes in order to sustain the services and benefits they provide to society. The present (2011) species- and sector-centric way we manage these ecosystems cannot account properly for cumulative effects, sustaining multiple ecosystem services, and holistically and explicitly evaluating the tradeoffs associated with proposed alternative and multiple human uses. A transition to an ecosystem-based approach to management and conservation of coastal and marine resources is needed. Competing uses and activities such as commerce, recreation, cultural practices, energy development, conservation, and national security are increasing pressure for new and expanded resource usage in coastal marine ecosystems. Current management efforts use a sector-by-sector approach that mostly focuses on a limited range of tools and outcomes [for example, oil and gas leases, fishery management plans, and Marine Protected Areas (MPAs)]. A comprehensive, ecosystem-based, and proactive approach to planning and managing these uses and activities is needed. Further, scientific understanding and information are essential to achieve an integrated decision-making process that includes knowledge of ecosystem services, existing and possible future conditions, and potential consequences of natural and anthropogenic events. Because no single government agency has executive authority for coastal or ocean resources, conflicting objectives around competing uses abound. In recent years, regional- and state-level initiatives in Coastal and Marine Spatial Planning (CMSP) have emerged to coordinate management activities. In some respects, the components and steps of the overall CMSP process are similar to how existing ocean resources are regulated and managed. For example, the Bureau of Ocean Energy Management Regulation

  9. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-09

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

  10. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    International Nuclear Information System (INIS)

    1994-01-01

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations

  11. Nuclear reactors built, being built, or planned in the United States

    International Nuclear Information System (INIS)

    Goulden, A.M.

    1983-08-01

    This semiannual compilation provides current information about facilities for domestic use or export which are capable of sustaining a nuclear chain reaction. Civilian, production, and military reactors are listed, as are reactors for export and critical assembly facilities. Information given includes location, owner, principal nuclear contractor, type, power rating, docket number, and start-up and shutdown dates. Nuclear Reactors Built, Being Built, or Planned is also available on standing order (PB83-903000) through a deposit account with the National Technical Information Service, Springfield, VA 22161

  12. Mitigation action plan for liquid waste sites in the 100-BC-1, 100-DR-1, and 100-HR-1 units

    International Nuclear Information System (INIS)

    Weiss, S.G.

    1996-05-01

    A Record of Decision (ROD) was issued for remediation of waste sites in the 100-BC-1, 100-DR-1, and 100-HR-1 Operable Units in the 100 Area of the Hanford Site. This Mitigation Action Plan (MAP) explains how mitigation measures for these remedial activities will be planned and implemented. The new activities planned in the ROD are not anticipated to result in releases of hazardous substances and will minimize disturbance of currently undisturbed areas. However, certain actions required by the ROD may result in the redisturbance of areas of recovering vegetation. This MAP presents a strategy for limiting disturbances and identifies an opportunity for revegetating a previously disturbed site; the knowledge gained from this demonstration project can be applied to final revegetation of the rest of the remediated sites and sites disturbed during cleanup when remediation of an area is completed. This work will be conducted in coordination with the Natural Resource Trustees Council and Native American Tribes to help minimize impacts to natural resources and cultural resources from project activities and to restore the remediated sites to an appropriate level of habitat

  13. Planned Home VBAC in the United States, 2004-2009: Outcomes, Maternity Care Practices, and Implications for Shared Decision Making.

    Science.gov (United States)

    Cox, Kim J; Bovbjerg, Marit L; Cheyney, Melissa; Leeman, Lawrence M

    2015-12-01

    In the United States, the number of planned home vaginal births after cesarean (VBACs) has increased. This study describes the maternal and neonatal outcomes for women who planned a VBAC at home with midwives who were contributing data to the Midwives Alliance of North America Statistics Project 2.0 cohort during the years 2004-2009. Two subsamples were created from the parent cohort: 12,092 multiparous women without a prior cesarean and 1,052 women with a prior cesarean. Descriptive statistics were calculated for maternal and neonatal outcomes for both groups. Sensitivity analyses comparing women with a prior vaginal birth and those who were at the lowest risk with various subgroups in the parent cohort were also conducted. Women with a prior cesarean had a VBAC rate of 87 percent, although transfer rates were higher compared with women without a prior cesarean (18% vs 7%, p history of cesarean (p = 0.015). Although there is a high likelihood of a vaginal birth at home, women planning a home VBAC should be counseled regarding maternal transfer rates and potential for increased risk to the newborn, particularly if uterine rupture occurs in the home setting. © 2015 Wiley Periodicals, Inc.

  14. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium- 99 T c -Nitrate multi-contaminant IRM plume identified beneath U Plant

  15. On the accuracy of self-made dose planning system based on the static field measurements of cobalt unit Theratron 780C

    International Nuclear Information System (INIS)

    Treer, T.; Polgar, I.

    1995-01-01

    In connection with the installation of the new Theratron 780C cobalt unit the authors demonstrate that the planning program developed in Pecs 8 years ago can be used even for the new cobalt unit. The computed results are in good agreement with the measurements made by the PTW MP3 water phantom using the Mephysto program. (N.T.) 3 refs., 4 figs

  16. Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2002-04-01

    Corrective Action Unit (CAU) 490, Station 44 Burn Area is located on the Tonopah Test Range (TTR). CAU 490 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and includes for Corrective Action Sites (CASs): (1) Fire Training Area (CAS 03-56-001-03BA); (2) Station 44 Burn Area (CAS RG-56-001-RGBA); (3) Sandia Service Yard (CAS 03-58-001-03FN); and (4) Gun Propellant Burn Area (CAS 09-54-001-09L2).

  17. Waste management plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Plant Landfill V, and restore the affected floodplain. The waste management plan addresses management and disposition of all wastes generated during the LEFPC remedial action. Most of the solid wastes will be sanitary or construction/demolition wastes and will be disposed of at existing Y- 12 facilities. Some small amounts of hazardous waste are anticipated, along with possible low-level or mixed wastes (> 35 pCi/g). Liquid wastes will be generated which will be sanitary and capable of being disposed of at the Oak Ridge Sewage Treatment Plant, except sanitary sewage.

  18. Waste management plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Plant Landfill V, and restore the affected floodplain. The waste management plan addresses management and disposition of all wastes generated during the LEFPC remedial action. Most of the solid wastes will be sanitary or construction/demolition wastes and will be disposed of at existing Y- 12 facilities. Some small amounts of hazardous waste are anticipated, along with possible low-level or mixed wastes (> 35 pCi/g). Liquid wastes will be generated which will be sanitary and capable of being disposed of at the Oak Ridge Sewage Treatment Plant, except sanitary sewage

  19. Research plan to reduce health disparities in the United States of America

    Directory of Open Access Journals (Sweden)

    2001-01-01

    Full Text Available La salud de los habitantes de los Estados Unidos de América (EE.UU. ha mejorado en las últimas décadas, pero, a pesar de ello, sigue habiendo diferencias notables entre la carga de enfermedad y la mortalidad de la mayoría de la población del país y de minorías tales como los afroamericanos, los hispanos, los indios norteamericanos, los indígenas de Alaska, los asiáticos o los oriundos de las islas del Pacífico. Estas minorías raciales y étnicas, que en la actualidad representan cerca del 28% de la población de los EE.UU., tienen menor esperanza de vida y presentan mayores tasas de enfermedad cardiovascular, cáncer, mortalidad infantil, malformaciones congénitas, asma, diabetes, accidentes vasculares cerebrales, enfermedades de transmisión sexual y enfermedades mentales. Entre los organismos gubernamentales de los EE.UU. que están trabajando para reducir estas disparidades de salud se encuentran los Institutos Nacionales de la Salud (National Institutes of Health: NIH. Basándose en sus propios esfuerzos anteriores, los NIH han publicado recientemente un borrador de un plan quinquenal denominado "Plan estratégico de investigación del NIH para reducir y eliminar las disparidades de salud". El documento describe las tres áreas principales en las que los NIH centrarán sus esfuerzos para reducir dichas disparidades: investigación, infraestructura de investigación, e información pública y expansión de los servicios a la comunidad.

  20. The role of family planning in achieving safe pregnancy for serodiscordant couples: commentary from the United States government's interagency task force on family planning and HIV service integration.

    Science.gov (United States)

    Mason, Jennifer; Medley, Amy; Yeiser, Sarah; Nightingale, Vienna R; Mani, Nithya; Sripipatana, Tabitha; Abutu, Andrew; Johnston, Beverly; Watts, D Heather

    2017-03-08

    People living with HIV (PLHIV) have the right to exercise voluntary choices about their health, including their reproductive health. This commentary discusses the integral role that family planning (FP) plays in helping PLHIV, including those in serodiscordant relationships, achieve conception safely. The United States (US) President's Emergency Plan for AIDS Relief (PEPFAR) is committed to meeting the reproductive health needs of PLHIV by improving their access to voluntary FP counselling and services, including prevention of unintended pregnancy and counselling for safer conception. Inclusion of preconception care and counselling (PCC) as part of routine HIV services is critical to preventing unintended pregnancies and perinatal infections among PLHIV. PLHIV not desiring a current pregnancy should be provided with information and counselling on all available FP methods and then either given the method onsite or through a facilitated referral process. PLHIV, who desire children should be offered risk reduction counselling, support for HIV status disclosure and partner testing, information on safer conception options to reduce the risk of HIV transmission to the partner and the importance of adhering to antiretroviral treatment during pregnancy and breastfeeding to reduce the risk of vertical transmission to the infant. Integration of PCC, HIV and FP services at the same location is recommended to improve access to these services for PLHIV. Other considerations to be addressed include the social and structural context, the health system capacity to offer these services, and stigma and discrimination of providers. Evaluation of innovative service delivery models for delivering PCC services is needed, including provision in community-based settings. The US Government will continue to partner with local organizations, Ministries of Health, the private sector, civil society, multilateral and bilateral donors, and other key stakeholders to strengthen both the policy and

  1. Planning for the next generation of proton-decay experiments in the United States

    International Nuclear Information System (INIS)

    Ayres, D.S.

    1982-01-01

    There are now three well-developed proposals for new proton decay detectors to be built in the United States. These are the 1000 to 5000-ton Soudan 2 tracking calorimeter, the 1400-ton Homestake II liquid scintillator Tracking Spectrometer, and the 2500-ton University of Pennsylvania liquid-scintillator - proportional-drift-cell calorimeter. These proposals were reviewed by the Department of Energy Technical Assessment Panel on Proton Decay in February 1982. I shall describe the Soudan and Pennsylvania proposals, present the latest results from the 31-ton Soudan 1 experiment, and discuss the recommendations of the DOE Panel. Following these recommendations, a one-week workshop, to be held at Argonne in June, will focus on the optimization of techniques for future experiments

  2. Closure plan for Corrective Action Unit 94: Building 650 Leachfield, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1998-03-01

    The Building 650 Leachfield, Corrective Action Unit (CAU) 94, will be clean closed by removal in accordance with the Resource Conservation and Recover Act (RCRA) operational permit and the Federal Facility Agreement and Consent Order. Historically, laboratory effluent was discharged through pipelines leading from the Radiochemistry Laboratory in Building 650 to a distribution box and a series of pipes dispersed across the leachfield. Effluent from the laboratory contained both hazardous and radioactive constituents. Discharge of hazardous and radioactive waste began in 1965. Discharge of radioactive waste ended in 1979 and hazardous waste discharge ended in 1987. From 1987 to 1993 the leachfield was used for the disposal of non-hazardous waste water. The piping leading to the leachfield was sealed in 1993

  3. Structure and Function: Planning a New Intensive Care Unit to Optimize Patient Care

    Directory of Open Access Journals (Sweden)

    Jozef Kesecioğlu

    2014-08-01

    Full Text Available To survey the recent medical literature reporting effects of intensive care unit (ICU design on patients’ and family members’ well-being, safety and functionality. Features of ICU design linked to the needs of patients and their family are single-rooms, privacy, quiet surrounding, exposure to daylight, views of nature, prevention of infection, a family area and open visiting hours. Other features such as safety, working procedures, ergonomics and logistics have a direct impact on the patient care and the nursing and medical personnel. An organization structured on the needs of the patient and their family is mandatory in designing a new intensive care. The main aims in the design of a new department should be patient centered care, safety, functionality, innovation and a future-proof concept.

  4. SU-E-T-110: An Investigation On Monitor Unit Threshold and Effects On IMPT Delivery in Proton Pencil Beam Planning System

    International Nuclear Information System (INIS)

    Syh, J; Ding, X; Syh, J; Patel, B; Rosen, L; Wu, H

    2015-01-01

    Purpose: An approved proton pencil beam scanning (PBS) treatment plan might not be able to deliver because of existed extremely low monitor unit per beam spot. A dual hybrid plan with higher efficiency of higher spot monitor unit and the efficacy of less number of energy layers were searched and optimized. The range of monitor unit threshold setting was investigated and the plan quality was evaluated by target dose conformity. Methods: Certain limitations and requirements need to be checks and tested before a nominal proton PBS treatment plan can be delivered. The plan needs to be met the machine characterization, specification in record and verification to deliver the beams. Minimal threshold of monitor unit, e.g. 0.02, per spot was set to filter the low counts and plan was re-computed. Further MU threshold increment was tested in sequence without sacrificing the plan quality. The number of energy layer was also alternated due to elimination of low count layer(s). Results: Minimal MU/spot threshold, spot spacing in each energy layer and total number of energy layer and the MU weighting of beam spots of each beam were evaluated. Plan optimization between increases of the spot MU (efficiency) and less energy layers of delivery (efficacy) was adjusted. 5% weighting limit of total monitor unit per beam was feasible. Scarce spreading of beam spots was not discouraging as long as target dose conformity within 3% criteria. Conclusion: Each spot size is equivalent to the relative dose in the beam delivery system. The energy layer is associated with the depth of the targeting tumor. Our work is crucial to maintain the best possible quality plan. To keep integrity of all intrinsic elements such as spot size, spot number, layer number and the carried weighting of spots in each layer is important in this study

  5. Financial Workbook

    International Development Research Centre (IDRC) Digital Library (Canada)

    jmcdonald

    FR3 – Payment Receipts, Foreign Exchange and Other Income Forms . ... function it must be used with Microsoft Excel 2007 or a later release. If the ... If there are insufficient rows, use the 'Add new row' button appearing below the list of.

  6. Corrective Action Investigation Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Grant Evenson

    2006-01-01

    Corrective Action Unit (CAU) 139 is located in Areas 3, 4, 6, and 9 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 139 is comprised of the seven corrective action sites (CASs) listed below: (1) 03-35-01, Burn Pit; (2) 04-08-02, Waste Disposal Site; (3) 04-99-01, Contaminated Surface Debris; (4) 06-19-02, Waste Disposal Site/Burn Pit; (5) 06-19-03, Waste Disposal Trenches; (6) 09-23-01, Area 9 Gravel Gertie; and (7) 09-34-01, Underground Detection Station. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives with the exception of CASs 09-23-01 and 09-34-01. Regarding these two CASs, CAS 09-23-01 is a gravel gertie where a zero-yield test was conducted with all contamination confined to below ground within the area of the structure, and CAS 09-34-01 is an underground detection station where no contaminants are present. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for the other five CASs where information is insufficient. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 4, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 139

  7. Neonatal Mortality of Planned Home Birth in the United States in Relation to Professional Certification of Birth Attendants.

    Directory of Open Access Journals (Sweden)

    Amos Grünebaum

    Full Text Available Over the last decade, planned home births in the United States (US have increased, and have been associated with increased neonatal mortality and other morbidities. In a previous study we reported that neonatal mortality is increased in planned home births but we did not perform an analysis for the presence of professional certification status.The objective of this study therefore was to undertake an analysis to determine whether the professional certification status of midwives or the home birth setting are more closely associated with the increased neonatal mortality of planned midwife-attended home births in the United States.This study is a secondary analysis of our prior study. The 2006-2009 period linked birth/infant deaths data set was analyzed to examine total neonatal deaths (deaths less than 28 days of life in term singleton births (37+ weeks and newborn weight ≥ 2,500 grams without documented congenital malformations by certification status of the midwife: certified nurse midwives (CNM, nurse midwives certified by the American Midwifery Certification Board, and "other" or uncertified midwives who are not certified by the American Midwifery Certification Board.Neonatal mortality rates in hospital births attended by certified midwives were significantly lower (3.2/10,000, RR 0.33 95% CI 0.21-0.53 than home births attended by certified midwives (NNM: 10.0/10,000; RR 1 and uncertified midwives (13.7/10,000; RR 1.41 [95% CI, 0.83-2.38]. The difference in neonatal mortality between certified and uncertified midwives at home births did not reach statistical levels (10.0/10,000 births versus 13.7/10,000 births p = 0.2.This study confirms that when compared to midwife-attended hospital births, neonatal mortality rates at home births are significantly increased. While NNM was increased in planned homebirths attended by uncertified midwives when compared to certified midwives, this difference was not statistically significant. Neonatal

  8. Neonatal Mortality of Planned Home Birth in the United States in Relation to Professional Certification of Birth Attendants.

    Science.gov (United States)

    Grünebaum, Amos; McCullough, Laurence B; Arabin, Birgit; Brent, Robert L; Levene, Malcolm I; Chervenak, Frank A

    2016-01-01

    Over the last decade, planned home births in the United States (US) have increased, and have been associated with increased neonatal mortality and other morbidities. In a previous study we reported that neonatal mortality is increased in planned home births but we did not perform an analysis for the presence of professional certification status. The objective of this study therefore was to undertake an analysis to determine whether the professional certification status of midwives or the home birth setting are more closely associated with the increased neonatal mortality of planned midwife-attended home births in the United States. This study is a secondary analysis of our prior study. The 2006-2009 period linked birth/infant deaths data set was analyzed to examine total neonatal deaths (deaths less than 28 days of life) in term singleton births (37+ weeks and newborn weight ≥ 2,500 grams) without documented congenital malformations by certification status of the midwife: certified nurse midwives (CNM), nurse midwives certified by the American Midwifery Certification Board, and "other" or uncertified midwives who are not certified by the American Midwifery Certification Board. Neonatal mortality rates in hospital births attended by certified midwives were significantly lower (3.2/10,000, RR 0.33 95% CI 0.21-0.53) than home births attended by certified midwives (NNM: 10.0/10,000; RR 1) and uncertified midwives (13.7/10,000; RR 1.41 [95% CI, 0.83-2.38]). The difference in neonatal mortality between certified and uncertified midwives at home births did not reach statistical levels (10.0/10,000 births versus 13.7/10,000 births p = 0.2). This study confirms that when compared to midwife-attended hospital births, neonatal mortality rates at home births are significantly increased. While NNM was increased in planned homebirths attended by uncertified midwives when compared to certified midwives, this difference was not statistically significant. Neonatal mortality rates

  9. Corrective action investigation plan for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 342, the Area 23 Mercury Fire Training Pit (FTP), which is located in Area 23 at the Nevada Test Site (NTS). The NTS is approximately 88 km (55 mi) northwest of Las Vegas, Nevada. Corrective Action Unit 342 is comprised of CAS 23-56-01. The FTP is an area approximately 100 m by 140 m (350 ft by 450 ft) located west of the town of Mercury, Nevada, which was used between approximately 1965 and 1990 to train fire-fighting personnel (REECo, 1991; Jacobson, 1991). The surface and subsurface soils in the FTP have likely been impacted by hydrocarbons and other contaminants of potential concern (COPC) associated with burn activities and training exercises in the area.

  10. Minimum monitor unit per segment IMRT planning and over-shoot-ratio

    International Nuclear Information System (INIS)

    Grigorov, G.; Barnett, R.; Chow, J.

    2004-01-01

    The aim of this work is to describe the modulation quality for dose delivery of small Multi-Leaf Collimator (MLC) fields and MU/segment. The results were obtained with Pinnacle (V6) and a Varian Clinac 2100 EX (Varis 6.2) linear accelerator. The over-shoot effect was investigated by comparing integrated multiple segmented exposures to a single exposure with the same number of total MU (1, 2, 3,4, 5 and 6 MU). To present the OS effect the Over-Shoot-Ratio (OSR) was defined as the ratio of the segmented dose for a 1 cm 2 field at depth to the static dose for the same field size and depth. OSR was measured as a function of MU/segment and dose rate. Measured results can be used to optimise IMRT planning and also to calculate the surface dose. The dependence of the dose in depth with 1, 2, 3, 4, and 5 MU/segments for 6 MV photon beam, dose rate of 100 MU/min and 1 cm 2 beam field at the central axis is presented, where the argument of the function is the depth and parameter of the function is the number of minimum MU/segment. The dependence of the overshoot ratio on the MU/segment with a parameter of the dose rates (100, 400 and 600 MU/min) is also shown. The effect increases with the dose rate and decreases with the increasing of the minimum number of MU/segment. Having measured OSR for the 2100 EX linac it is possible to do correction and calibration of the dose of the first segment of IMRT beam, where the dose to the target and on the surface can increase over the planed dose of 1 MU by 40% and 70% for dose rate of 400 and 600 MU/min respectively. The Over-Shoot-Ratio is an important parameter to be determined as part of the routine quality assurance for IMRT and can be used to significantly improve the agreement between planned and delivered doses to the patient

  11. Eastman Chemical plans PETG for first Asia/Pacific production unit

    International Nuclear Information System (INIS)

    Jackson, D.

    1993-01-01

    Eastman Chemical (Kingsport, TN) will begin work on its first Asia/Pacific manufacturing plant this year. The company says it will spend $30 million-$100 million to build a polyethylene terephthalate glycol (PETG) plant with capacity for several million lbs/year. Earnest Deavenport, Eastman president and keynote speaker at CW's 1993 Asia/Pacific Chemical Industry Conference in Singapore last week, said 'several hundred million dollars' will be spent in the region during the next five years, and he is optimistic that plans to invest in China will start to bear fruit. The company is in the final stages of feasibility studies on the PETG plant site, says Garland Williamson, regional v.p./manufacturing, Eastman Chemical International Ltd. Seven locations - in Thailand, Malaysia, Singapore, and Indonesia - will be whittled down to two within the next couple of months, and engineering work will begin this year for an onstream date in second-half 1995. Eastman already ships PETG, a modified polyester used in food packaging, to the Asia/Pacific region. Deavenport does not rule out taking a partner to build the new plant, but it would have to be a 'nonoperating' role, he notes

  12. Operable Unit 7-13/14 in situ thermal desorption treatability study work plan

    International Nuclear Information System (INIS)

    Shaw, P.; Nickelson, D.; Hyde, R.

    1999-01-01

    This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA

  13. Engineering work plan for PFP criticality alarm panel first unit re-build

    International Nuclear Information System (INIS)

    Clem, W.E.

    1994-01-01

    This document describes the first step in increasing the quality, reliability, and ease of maintenance of the nine Criticality Alarm Panels (CAP) at PFP. Development control practices and guidelines of WHC-CM-6-1, EP-2.4 and WHC-IP-1026, EPG-2.4 are applied to develop a prototype of a replacement Criticality Alarm Panel (CAP) with facility-use potential. During the development of the prototype CAP, the design requirements of all of PFP's nine CAPs are considered to develop standardized hardware and detailed design drawings that are tailored to PFP maintenance needs. Increased quality and reliability is achieved through quality hardware, proven technology and design techniques, and the use of the Class 1E workmanship standards of WHC-CM-8-1. The end result of the work described by this work plan is a verified/read-to-install replacement for CAP Z4 and verified/released H-2 drawings that are formatted such that they can easily be replicated when producing design drawings for the other eight CAPs

  14. Environmental issues in planning building energy technologies R ampersand D in the United States

    International Nuclear Information System (INIS)

    Farhar, B.C.; Abel, F.H.; Nicholls, A.K.; Millhone, J.P.

    1991-08-01

    The US Department of Energy's Office of Building Technologies (OBT) has begun studies on the relationship and impact of buildings energy use on the environment, particularly with respect to global climate change, acid rain, stratospheric ozone depletion, and indoor air quality. The paper presents an overview of international and US federal activity in global change to set OBT's activities in context. The paper then reviews briefly the contribution of buildings to atmospheric problems through building energy use. OBT's program primarily supports projects with indirect environmental impacts through energy efficiency (e.g., thermally activated heat pumps use natural gas instead of electricity) and the use of renewables in buildings. The paper briefly describes the OBT program and covers an inventory of projects that OBT has funded on environmental/building problems. Analyses have included three kinds of topics: (1) CFC substitutes for refrigeration equipment, (2) incorporating the cost of externalities into utility electricity generation, and (3) indoor air quality. The paper shows how environmental issues are being taken into account in planning the US R ampersand D program in building energy technologies. 27 refs

  15. The Assessment of Primary Education First Grade Turkish Coursebook, Student's Workbook and Teacher's Book Depending on Teachers' Opinions

    OpenAIRE

    Ayfer ŞAHİN

    2008-01-01

    In this study, the Turkish coursebook, student's workbook and the teacher's book that is delivered unpaid by the Ministry of Education to the teachers and students in primary education, first classes in 2007-2008 educational year; It is assessed depending on the teachers' opinions, the scale developed according to the criterias that has to be in the coursebooks which are determined in the instruction relating to the study and evaluation of Ministry of Education coursebooks and educational mea...

  16. Remedial investigation/feasibility study work plan for the 300-FF-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1990-03-01

    Over 1,400 waste facilities have been identified on the Hanford Site. Most of the waste facilities are located within geographic areas on the Hanford Site that are referred to as the 100, 200, 300, 400, and 1100 areas. The purpose of this work plan is to document the project scoping process and to outline all remedial investigation/feasibility study (RI/FS) activities, to determine the nature and extent of the threat presented by releases of hazardous substances from the operable unit, and to evaluate proposed remedies for such releases. The goal of the 300-FF-1 remedial investigation (RI) is to provide sufficient information needed to conduct the feasibility study (FS), by determining the nature and extent of the threat to public health and the environment posed by releases of hazardous substances from 300-FF-1, and the performance of specific remedial technologies. 62 refs., 28 figs., 48 tabs

  17. Sampling and analysis plan for remediation of Operable Unit 100-IU-3 waste site 600-104

    International Nuclear Information System (INIS)

    1997-08-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities to support remediation of 100-IU-3 Operable Unit waste site 600-104. The purpose of the proposed sampling and analysis activities is to demonstrate that time-critical remediation of the waste site for soil containing 2,4-Dichlorophonoxyacetic acid salts and esters (2,4-D) and dioxin/furan isomers at concentrations that exceed cleanup levels has been effective. This shall be accomplished by sampling various locations of the waste site before and after remediation, analyzing the samples, and comparing the results to action levels set by the Washington State Department of Ecology

  18. Sampling and analysis plan for remediation of Operable Unit 100-IU-3 waste site 600-104. Revision 1

    International Nuclear Information System (INIS)

    1997-08-01

    This sampling and analysis plan presents the rationale and strategy for the sampling and analysis activities to support remediation of 100-IU-3 Operable Unit waste site 600-104. The purpose of the proposed sampling and analysis activities is to demonstrate that time-critical remediation of the waste site for soil containing 2,4-Dichlorophenoxyacetic acid salts and esters (2,4-D) and dioxin/furan isomers at concentrations that exceed cleanup levels has been effective. This shall be accomplished by sampling various locations of the waste site before and after remediation, analyzing the samples, and comparing the results to action levels set by the Washington State Department of Ecology

  19. Field Sampling Plan for the Operable Units 6-05 and 10-04 Remedial Action, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. Wells

    2006-11-14

    This Field Sampling Plan outlines the collection and analysis of samples in support of Phase IV of the Waste Area Group 10, Operable Units 6-05 and 10-04 remedial action. Phase IV addresses the remedial actions to areas with the potential for unexploded ordnance at the Idaho National Laboratory Site. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. The remedial action consists of removal and disposal of ordnance by high-order detonation, followed by sampling to determine the extent, if any, of soil that might have been contaminated by the detonation activities associated with the disposal of ordnance during the Phase IV activities and explosives during the Phase II activities.

  20. Corrective Action Investigation Plan for Corrective Action Unit 543: Liquid Disposal Units Nevada Test Site, Nevada, Rev. No.: 0 with ROTC 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    David A. Strand

    2004-05-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 543: Liquid Disposal Units, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S Department of Defense (DoD). Corrective Action Unit 543 is located in Area 6 and Area 15 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Seven corrective action sites (CASs) comprise CAU 543 and are listed below: (1) 06-07-01, Decon Pad; (2) 15-01-03, Aboveground Storage Tank; (3) 15-04-01, Septic Tank; (4) 15-05-01, Leachfield; (5) 15-08-01, Liquid Manure Tank; (6) 15-23-01, Underground Radioactive Material Area; and (7) 15-23-03, Contaminated Sump, Piping. Corrective Action Site 06-07-01, Decon Pad, is located in Area 6 and consists of the Area 6 Decontamination Facility and its components that are associated with decontamination of equipment, vehicles, and materials related to nuclear testing. The six CASs in Area 15 are located at the U.S. Environmental Protection Agency (EPA) Farm and are related to waste disposal activities at the EPA Farm. The EPA Farm was a fully-functional dairy associated with animal experiments conducted at the on-site laboratory. The corrective action investigation (CAI) will include field inspections, video-mole surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions. The CASs within CAU 543 are being investigated because hazardous and/or radioactive constituents may be present at concentrations that could potentially pose a threat to human health and the environment. The seven CASs in CAU 543

  1. Corrective action investigation plan for Corrective Action Unit Number 427: Area 3 septic waste system numbers 2 and 6, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the Area 3 Compound, specifically Corrective Action Unit (CAU) Number 427, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, Nevada. The Corrective Action Unit Work Plan, Tonopah Test Range, Nevada divides investigative activities at TTR into Source Groups. The Septic Tanks and Lagoons Group consists of seven CAUs. Corrective Action Unit Number 427 is one of three septic waste system CAUs in TTR Area 3. Corrective Action Unit Numbers 405 and 428 will be investigated at a future data. Corrective Action Unit Number 427 is comprised of Septic Waste Systems Number 2 and 6 with respective CAS Numbers 03-05-002-SW02 and 03-05-002-SW06

  2. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2011-08-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information and process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

  3. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-08-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

  4. Application of safety standards and rules in the Shelter Implementation Plan at the destroyed power unit of Chernobyl NPP

    International Nuclear Information System (INIS)

    Berthold, A.; Bogorinski, P.; Bykov, V.; Redko, V.; Erickson, L.; Kadkin, Ye.; Kondratiev, S.; Simonov, I.; Smyshliaieva, S.; Yesipenko, Yu.

    2002-01-01

    This report deals with the application of safety standards and rules to the Shelter Implementation Plan (SIP) measures. Since 1998 this plan is being implemented at the Chornobyl NPP destroyed unit (which is now known as the Shelter). It includes a set of various tasks whose performance will help partially achieve the established safety objectives. The Regulatory Authority should establish for the Shelter safety goals, principles, and criteria in general, while the Operator of the Shelter is free to independently select the optimum method for their implementation. The Operator of the Shelter must demonstrate (in safety analysis report) that established safety goals are achieved and safety principles and criteria are met. Safety goals, principles, and criteria established for radioactive waste management are reasonable to apply in measures provided for by SIP. However, due to the unique nature of the Shelter, some criteria should not be applied directly and in full scope. Norms and rules on radiation protection should be applied in full scope. The specifics of radiation protection during each Shelter-related activity are considered individually. Safety standards and rules related to technical aspects are reasonable only as a basis. Effective resolution of specific technical issues associated with safety assurance is achieved through interaction between the Operator and the Regulatory Authority during design of SIP structures and systems. Hence, effectiveness of the licensing process plays an important role in the success of the SIP.(author)

  5. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    T. M. Fitzmaurice

    2000-01-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection[NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site

  6. Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-05-08

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Station (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  7. An independent monitor unit calculation by commercial software as a part of a radiotherapy treatment planning system quality control

    International Nuclear Information System (INIS)

    Nechvil, K.; Mynarik, J.

    2014-01-01

    For the independent calculation of the monitored unit (MU) the commercial software RadCalc (Lifeline Software Inc., Tyler TX) was used as the choice of some available similar programs. The program was configured and used to verify the doses calculated by commercially accessible planning system Eclipse version 8.6.17 (Varian Medical System Inc., Palo Alto). This system is being used during the clinical running for the creation of the treatment plans. The results of each plan were compared to the dose phantom measurements by the ionization chamber at the same point in which the calculation were done (Eclipse, RadCalc) - in the izocentre. TPS is configured by the beam data (PDD and OAR). Those beam data were exported and afterwards the same data were imported to the program RadCalc. The consistent and independent data between TPS and RadCalc were gained by this process. The reference conditions were set the identical in RadCalc as in TPS, so the consistency between TPS and RadCalc output factors has been achieved (Collimator Scatter Factor: Sc, Phantom Scatter Factor: Sp). Those output factors were also measured by the ionizing chamber in the water phantom and compared with the TPS. Based on the clinical data of the response to the doses, ICRU recommends ensuring the ability of dosimetric systems to deliver the doses with accuracy of at least 5%. Many factors, such as layout of anatomic structures, positioning of a patient, factors related to an accelerator (a dose calibration and mechanic parameters) cause random and systematic failures in a dose delivery. The source of some problems can be also caused by the system databases and relating information transfer; and the TPS containing besides other things other dose calculation algorithms. (authors)

  8. Poster - 21: Verification of Monitor Unit Calculations for Breast Field-In-Field Three-Dimensional Conformal Radiotherapy Plans

    International Nuclear Information System (INIS)

    Kosztyla, Robert; Pierce, Greg; Ploquin, Nicolas; Roumeliotis, Michael; Schinkel, Colleen

    2016-01-01

    Purpose: To determine the source of systematic monitor unit (MU) calculation discrepancies between RadCalc and Eclipse treatment planning software for three-dimensional conformal radiotherapy field-in-field breast treatments. Methods: Data were reviewed for 28 patients treated with a field-in-field breast technique with MU calculations from RadCalc that were larger than MU calculations from Eclipse for at least one field. The distance of the calculation point from the jaws was measured in each field’s beam’s-eye-view and compared with the percentage difference in MU (%ΔMU) between RadCalc and Eclipse. 10×10, 17×13 and 20×20 cm 2 beam profiles were measured using the Profiler 2 diode array for 6-MV photon beams and compared with profiles calculated with Eclipse and RadCalc using a gamma analysis (3%, 3 mm). Results: The mean %ΔMU was 1.3%±0.3%. There was a statistically-significant correlation between %ΔMU and the distance of the calculation point from the Y jaw (r=−0.43, p<0.001). RadCalc profiles differed from measured profiles, especially near the jaws. The gamma pass rate for 6-MV fields of 17×13 cm 2 field size was 95%±1% for Eclipse-generated profiles and 53%±20% for RadCalc-generated profiles (p=0.01). Conclusions: Calculations using RadCalc for field-in-field breast plans resulted in MUs that were larger than expected from previous clinical experience with wedged plans with calculation points far from the jaws due to the position of the calculation point near the jaws in the beam’s-eye-view of each field.

  9. Poster - 21: Verification of Monitor Unit Calculations for Breast Field-In-Field Three-Dimensional Conformal Radiotherapy Plans

    Energy Technology Data Exchange (ETDEWEB)

    Kosztyla, Robert; Pierce, Greg; Ploquin, Nicolas; Roumeliotis, Michael; Schinkel, Colleen [Tom Baker Cancer Centre, Calgary, AB, Tom Baker Cancer Centre, Tom Baker Cancer Centre, Tom Baker Cancer Centre, Calgary, AB, Tom Baker Cancer Centre, Calgary, AB (Canada)

    2016-08-15

    Purpose: To determine the source of systematic monitor unit (MU) calculation discrepancies between RadCalc and Eclipse treatment planning software for three-dimensional conformal radiotherapy field-in-field breast treatments. Methods: Data were reviewed for 28 patients treated with a field-in-field breast technique with MU calculations from RadCalc that were larger than MU calculations from Eclipse for at least one field. The distance of the calculation point from the jaws was measured in each field’s beam’s-eye-view and compared with the percentage difference in MU (%ΔMU) between RadCalc and Eclipse. 10×10, 17×13 and 20×20 cm{sup 2} beam profiles were measured using the Profiler 2 diode array for 6-MV photon beams and compared with profiles calculated with Eclipse and RadCalc using a gamma analysis (3%, 3 mm). Results: The mean %ΔMU was 1.3%±0.3%. There was a statistically-significant correlation between %ΔMU and the distance of the calculation point from the Y jaw (r=−0.43, p<0.001). RadCalc profiles differed from measured profiles, especially near the jaws. The gamma pass rate for 6-MV fields of 17×13 cm{sup 2} field size was 95%±1% for Eclipse-generated profiles and 53%±20% for RadCalc-generated profiles (p=0.01). Conclusions: Calculations using RadCalc for field-in-field breast plans resulted in MUs that were larger than expected from previous clinical experience with wedged plans with calculation points far from the jaws due to the position of the calculation point near the jaws in the beam’s-eye-view of each field.

  10. Monitor Unit Calculation for the Multileaf Intensity Modulating Collimator (MIMiCTM) in the PeacockTM Plan System

    International Nuclear Information System (INIS)

    Kania, Aleksander A.; Bleier, Alan R.; Carol, Mark P.

    1995-01-01

    A finite-size pencil beam method has been chosen for dose modelling in conformal radiotherapy when the Multileaf Intensity Modulating Collimator (MIMiC) is used to deliver the treatment. The MIMiC has two rows of 20 tungsten leaves which retract toward or away from the accelerator gantry, producing two intensity-modulated transaxial treatment slices which are 20 cm x 1 or 2 cm at isocenter. The treatment field is thus a fan beam made up of 40 sub-beams or finite-size pencil beams, leading to the choice of the model. Rotational treatments with the MIMiC are modelled in Peacock Plan as a set of ports spaced at gantry angle increments of 5 deg. to 10 deg. . The fractional time spent by the leaf in the beam during the gantry angle increment determines the intensity. The intensities from each leaf for each port are optimized in Peacock Plan, one treatment slice at a time, and then the dose from all slices is combined. The treatment planning system uses a two-dimensional measured pencil beam profile from one leaf at a selected reference depth along with measured open field, broad beam profiles at several depths. This makes beam data collection simple and dosimetrically flexible. The nature of the measured data imposes some conditions on calculation of Monitor Units (MU). The calculation must also take into consideration that two independent slices are delivered at the same time, and that multiple slices may be used to treat targets which are longer in the inferior-superior direction than the field produced by two slices. The MU calculation method is derived and presented as an enhancement of the traditional method of MU determination for treatments based on static ports. Experimental results indicative of the validity and limitations of the model will be demonstrated

  11. Sympathy for the Devil: Detailing the Effects of Planning-Unit Size, Thematic Resolution of Reef Classes, and Socioeconomic Costs on Spatial Priorities for Marine Conservation.

    Science.gov (United States)

    Cheok, Jessica; Pressey, Robert L; Weeks, Rebecca; Andréfouët, Serge; Moloney, James

    2016-01-01

    Spatial data characteristics have the potential to influence various aspects of prioritising biodiversity areas for systematic conservation planning. There has been some exploration of the combined effects of size of planning units and level of classification of physical environments on the pattern and extent of priority areas. However, these data characteristics have yet to be explicitly investigated in terms of their interaction with different socioeconomic cost data during the spatial prioritisation process. We quantify the individual and interacting effects of three factors-planning-unit size, thematic resolution of reef classes, and spatial variability of socioeconomic costs-on spatial priorities for marine conservation, in typical marine planning exercises that use reef classification maps as a proxy for biodiversity. We assess these factors by creating 20 unique prioritisation scenarios involving combinations of different levels of each factor. Because output data from these scenarios are analogous to ecological data, we applied ecological statistics to determine spatial similarities between reserve designs. All three factors influenced prioritisations to different extents, with cost variability having the largest influence, followed by planning-unit size and thematic resolution of reef classes. The effect of thematic resolution on spatial design depended on the variability of cost data used. In terms of incidental representation of conservation objectives derived from finer-resolution data, scenarios prioritised with uniform cost outperformed those prioritised with variable cost. Following our analyses, we make recommendations to help maximise the spatial and cost efficiency and potential effectiveness of future marine conservation plans in similar planning scenarios. We recommend that planners: employ the smallest planning-unit size practical; invest in data at the highest possible resolution; and, when planning across regional extents with the intention

  12. Corrective Action Investigation Plan for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    David A. Strand

    2004-09-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 145: Wells and Storage Holes. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 145 is located in Area 3 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 145 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-20-01, Core Storage Holes; (2) 03-20-02, Decon Pad and Sump; (3) 03-20-04, Injection Wells; (4) 03-20-08, Injection Well; (5) 03-25-01, Oil Spills; and (6) 03-99-13, Drain and Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. One conceptual site model with three release scenario components was developed for the six CASs to address all releases associated with the site. The sites will be investigated based on data quality objectives (DQOs) developed on June 24, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQOs process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 145.

  13. On the trail of preventing meningococcal disease: a survey of students planning to travel to the United States.

    Science.gov (United States)

    Huang, Hsien-Liang; Cheng, Shao-Yi; Lee, Long-Teng; Yao, Chien-An; Chu, Chia-Wei; Lu, Chia-Wen; Chiu, Tai-Yuan; Huang, Kuo-Chin

    2013-01-01

    College freshmen living in dormitories are at increased risk for meningococcal disease. Many students become a high-risk population when they travel to the United States. This study surveyed the knowledge, attitudes toward, and behavior surrounding the disease among Taiwanese college students planning to study in the United States, and to identify factors that may affect willingness to accept meningococcal vaccination. A cross-sectional survey of college students going to study in the United States was conducted in a medical center-based travel medicine clinic. Background information, attitudes, general knowledge, preventive or postexposure management, and individual preventive practices were collected through a structured questionnaire. A total of 358 students were included in the final analysis. More than 90% of participants believed that preventing meningococcal disease was important. However, fewer than 50% of students accurately answered six of nine questions exploring knowledge of the disease, and only 17.3% of students knew the correct management strategy after close contact with patients. Logistic regression analysis showed that students who understood the mode of transmission (odds ratio: 3.21, 95% CI = 1.117-9.229), medication management (1.88, 1.045-3.38), and epidemiology (2.735, 1.478-5.061) tended to be vaccinated. Despite an overall positive attitude toward meningococcal vaccination, there was poor knowledge about meningococcal disease. Promoting education on the mode of transmission, epidemiology, and pharmacological management of the disease could increase vaccination rates. Both the governments and travel medicine specialists should work together on developing an education program for this high-risk group other than just requiring vaccination. © 2013 International Society of Travel Medicine.

  14. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0

    Energy Technology Data Exchange (ETDEWEB)

    Wickline, Alfred

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting

  15. Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV Operations Office

    1999-05-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and criteria for conducting site investigation activities at CAU 232, Area 25 Sewage Lagoons. Corrective Action Unit 232 consists of CAS 25-03-01, Sewage Lagoon, located in Area 25 of the Nevada Test Site (NTS). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Area 25 Sewage Lagoons (Figure 1-2) (IT, 1999b) are located approximately 0.3 mi south of the Test Cell 'C' (TCC) Facility and were used for the discharge of sanitary effluent from the TCC facility. For purposes of this discussion, this site will be referred to as either CAU 232 or the sewage lagoons.

  16. Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Boehlecke, Robert F.

    2004-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to CAS 23-02-08. The scope of the corrective action investigation

  17. Wilmar Planning Tool, VBA documentation

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Helge V.

    2006-01-15

    This is a documentation of the VBA (Visual Basic for Applications) in the Wilmar Planning Tool. VBA is used in the Wilmar User Shell (an Excel workbook) and in the three Access databases that hold input, scenario and output data. The Wilmar Planning Tool is developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (contract ENK5-CT-2002-00663). The User Shell controls the operation of the Wilmar Planning Tool. In the User Shell various control parameters are set, and then a macro in the Input Database is run that writes input files for the Joint market Model and the Long Term Model. Afterwards these models can be started from the User Shell. Finally, the User Shell can start a macro in the Output Database that imports the output files from the models. (LN)

  18. Wilmar Planning Tool, VBA documentation

    International Nuclear Information System (INIS)

    Larsen, Helge V.

    2006-01-01

    This is a documentation of the VBA (Visual Basic for Applications) in the Wilmar Planning Tool. VBA is used in the Wilmar User Shell (an Excel workbook) and in the three Access databases that hold input, scenario and output data. The Wilmar Planning Tool is developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (contract ENK5-CT-2002-00663). The User Shell controls the operation of the Wilmar Planning Tool. In the User Shell various control parameters are set, and then a macro in the Input Database is run that writes input files for the Joint market Model and the Long Term Model. Afterwards these models can be started from the User Shell. Finally, the User Shell can start a macro in the Output Database that imports the output files from the models. (LN)

  19. A Plan for improving the industrial constitution in Korea for the Convention on Climate Change - concentrated on manufacturing CO{sub 2} unit analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Sang In; Kim, Tae Wan; Kim, Yong Kun; Sohn, Yang Hoon; Kim, Seung Woo [Korea Environment Institute, Seoul (Korea)

    1998-12-01

    Due to the implementation of the Convention on Climate Change in future, a policy plan to prepare for the Convention on Climate Change was promoted to improve constitution of domestic economy practically including foreign negotiation strategies, national energy policy and change in consumption pattern. Based on the CO{sub 2} unit analysis in manufacturing, this study proposed an improvement plan of industrial constitution in Korea to prepare for emission trading system. 31 refs., 30 figs., 68 tabs.

  20. Case report of a near medical event in stereotactic radiotherapy due to improper units of measure from a treatment planning system

    International Nuclear Information System (INIS)

    Gladstone, D. J.; Li, S.; Jarvis, L. A.; Hartford, A. C.

    2011-01-01

    Purpose: The authors hereby notify the Radiation Oncology community of a potentially lethal error due to improper implementation of linear units of measure in a treatment planning system. The authors report an incident in which a patient was nearly mistreated during a stereotactic radiotherapy procedure due to inappropriate reporting of stereotactic coordinates by the radiation therapy treatment planning system in units of centimeter rather than in millimeter. The authors suggest a method to detect such errors during treatment planning so they are caught and corrected prior to the patient positioning for treatment on the treatment machine. Methods: Using pretreatment imaging, the authors found that stereotactic coordinates are reported with improper linear units by a treatment planning system. The authors have implemented a redundant, independent method of stereotactic coordinate calculation. Results: Implementation of a double check of stereotactic coordinates via redundant, independent calculation is simple and accurate. Use of this technique will avoid any future error in stereotactic treatment coordinates due to improper linear units, transcription, or other similar errors. Conclusions: The authors recommend an independent double check of stereotactic treatment coordinates during the treatment planning process in order to avoid potential mistreatment of patients.

  1. Case report of a near medical event in stereotactic radiotherapy due to improper units of measure from a treatment planning system

    Energy Technology Data Exchange (ETDEWEB)

    Gladstone, D. J.; Li, S.; Jarvis, L. A.; Hartford, A. C. [Division of Radiation Oncology, Department of Medicine, Dartmouth-Hitchcock Medical Center, Norris Cotton Cancer Center, Lebanon, New Hampshire 03756 (United States); Division of Radiation Oncology, Department of Medicine, Dartmouth-Hitchcock Medical Center, Norris Cotton Cancer Center, Lebanon, New Hampshire 03756 and Department of Radiation Oncology, Temple University Hospital, Philadelphia, Pennsylvania 19104 (United States); Division of Radiation Oncology, Department of Medicine, Dartmouth-Hitchcock Medical Center, Norris Cotton Cancer Center, Lebanon, New Hampshire 03756 (United States)

    2011-07-15

    Purpose: The authors hereby notify the Radiation Oncology community of a potentially lethal error due to improper implementation of linear units of measure in a treatment planning system. The authors report an incident in which a patient was nearly mistreated during a stereotactic radiotherapy procedure due to inappropriate reporting of stereotactic coordinates by the radiation therapy treatment planning system in units of centimeter rather than in millimeter. The authors suggest a method to detect such errors during treatment planning so they are caught and corrected prior to the patient positioning for treatment on the treatment machine. Methods: Using pretreatment imaging, the authors found that stereotactic coordinates are reported with improper linear units by a treatment planning system. The authors have implemented a redundant, independent method of stereotactic coordinate calculation. Results: Implementation of a double check of stereotactic coordinates via redundant, independent calculation is simple and accurate. Use of this technique will avoid any future error in stereotactic treatment coordinates due to improper linear units, transcription, or other similar errors. Conclusions: The authors recommend an independent double check of stereotactic treatment coordinates during the treatment planning process in order to avoid potential mistreatment of patients.

  2. Two-unit cantilevered resin-bonded fixed partial denture as a substitute for a prosthodontic-orthodontic treatment plan: a 5-year case report.

    Science.gov (United States)

    Emami, Elham; St-Georges, Annie; de Grandmont, Pierre

    2012-01-01

    In this case report, we describe the successful long-term treatment of a patient with dental agenesis. The initial treatment plan included an orthodontic phase to provide adequate space for replacing missing lateral incisors with implants. However, because of some complications encountered after 2 years of orthodontic treatment, a revised treatment plan was considered to achieve functional and esthetic goals. The patient was completely satisfied 5 years after being treated with two 2-unit cantilevered resin-bonded fixed partial dentures supported by the cuspids. This conservative treatment plan was cost-effective without having any significant biological cost.

  3. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 408: Bomblet Target Area, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2006-01-01

    This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 408, Bomblet Target Area. CAU 408 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. One Corrective Action Site (CAS) is included in CAU 408: (lg b ullet) CAS TA-55-002-TAB2, Bomblet Target Areas Based on historical documentation, personnel interviews, process knowledge, site visits, aerial photography, multispectral data, preliminary geophysical surveys, and the results of data quality objectives process (Section 3.0), clean closure will be implemented for CAU 408. CAU 408 closure activities will consist of identification and clearance of bomblet target areas, identification and removal of depleted uranium (DU) fragments on South Antelope Lake, and collection of verification samples. Any soil containing contaminants at concentrations above the action levels will be excavated and transported to an appropriate disposal facility. Based on existing information, contaminants of potential concern at CAU 408 include explosives. In addition, at South Antelope Lake, bomblets containing DU were tested. None of these contaminants is expected to be present in the soil at concentrations above the action levels; however, this will be determined by radiological surveys and verification sample results. The corrective action investigation and closure activities have been planned to include data collection and hold points throughout the process. Hold points are designed to allow decision makers to review the existing data and decide which of the available options are most suitable. Hold points include the review of radiological, geophysical, and analytical data and field observations

  4. Corrective Action Investigation Plan for Corrective Action Unit 487: Thunderwell Site, Tonopah Test Range, Nevada (Rev. No.: 0, January 2001)

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-01-02

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 487, Thunderwell Site, Tonopah Test Range (TTR), Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 487 consists of a single Corrective Action Site (CAS), RG 26-001-RGRV, Thunderwell Site. The site is located in the northwest portion of the TTR, Nevada, approximately five miles northwest of the Area 3 Control Point and closest to the Cactus Flats broad basin. Historically, Sandia National Laboratories in New Mexico used CAU 487 in the early to mid-1960s for a series of high explosive tests detonated at the bottom of large cylindrical steel tubes. Historical photographs indicate that debris from these tests and subsequent operations may have been scattered and buried throughout the site. A March 2000 walk-over survey and a July 2000 geophysical survey indicated evidence of buried and surface debris in dirt mounds and areas throughout the site; however, a radiological drive-over survey also performed in July 2000 indicated that no radiological hazards were identified at this site. Based on site history, the scope of this plan is to resolve the problem statement identified during the Data Quality Objectives process that detonation activities at this CAU site may have resulted in the release of contaminants of concern into the surface/subsurface soil including total volatile and total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, radionuclides, total petroleum hydrocarbons, and high explosives. Therefore, the scope of corrective action field investigation will involve excavation, drilling, and extensive soil sampling and analysis activities to determine the extent (if any) of both the lateral and vertical contamination

  5. Corrective Action Investigation Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    David Strand

    2006-01-01

    Corrective Action Unit 166 is located in Areas 2, 3, 5, and 18 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit (CAU) 166 is comprised of the seven Corrective Action Sites (CASs) listed below: (1) 02-42-01, Cond. Release Storage Yd - North; (2) 02-42-02, Cond. Release Storage Yd - South; (3) 02-99-10, D-38 Storage Area; (4) 03-42-01, Conditional Release Storage Yard; (5) 05-19-02, Contaminated Soil and Drum; (6) 18-01-01, Aboveground Storage Tank; and (7) 18-99-03, Wax Piles/Oil Stain. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on February 28, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 166. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the CAI for CAU 166 includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling. (2) Conduct radiological surveys. (3) Perform field screening. (4) Collect and submit environmental samples for laboratory analysis to determine if

  6. Resource Conservation and Recovery Act (RCRA) general contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    Skaggs, B.E.

    1993-11-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures herein can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  7. Resource Conservation and Recovery Act (RCRA) contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-08-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  8. Corrective action investigation plan for the Roller Coaster RADSAFE Area, Corrective Action Unit 407, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    1998-04-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. CAUs consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU No. 407, the Roller Coaster RADSAFE Area (RCRSA) which is located on the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range Complex, is approximately 255 km (140 mi) northwest of Las Vegas, Nevada. CAU No. 407 is comprised of only one CAS (TA-23-001-TARC). The RCRSA was used during May and June 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The surface and subsurface soils are likely to have been impacted by plutonium and other contaminants of potential concern (COPCs) associated with decontamination activities at this site. The purpose of the corrective action investigation described in this CAIP is to: identify the presence and nature of COPCs; determine the vertical and lateral extent of COPCs; and provide sufficient information and data to develop and evaluate appropriate corrective actions for the CAS

  9. Corrective Action Investigation Plan for Corrective Action Unit 555: Septic Systems Nevada Test Site, Nevada, Rev. No.: 0 with Errata

    International Nuclear Information System (INIS)

    Pastor, Laura

    2005-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada, and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI

  10. Corrective Action Investigation Plan for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage, Nevada Test Site, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    1999-01-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the CAU 321 Area 22 Weather Station Fuel Storage, CAS 22-99-05 Fuel Storage Area. For purposes of this discussion, this site will be referred to as either CAU 321 or the Fuel Storage Area. The Fuel Storage Area is located in Area 22 of the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles[mi]) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Fuel Storage Area (Figure 1-2) was used to store fuel and other petroleum products necessary for motorized operations at the historic Camp Desert Rock facility which was operational from 1951 to 1958 at the Nevada Test Site, Nevada. The site was dismantled after 1958 (DOE/NV, 1996a)

  11. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Cox, D. H.

    2000-01-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved

  12. Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    D. H. Cox

    2000-07-01

    The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved.

  13. Streamlined Approach for Environmental Restoration Work Plan for Corrective Action Unit 461: Joint Test Assembly Sites and Corrective Action Unit 495: Unconfirmed Joint Test Assembly Sites Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Jeff Smith

    1998-08-01

    This Streamlined Approach for Environmental Restoration plan addresses the action necessary for the clean closure of Corrective Action Unit 461 (Test Area Joint Test Assembly Sites) and Corrective Action Unit 495 (Unconfirmed Joint Test Assembly Sites). The Corrective Action Units are located at the Tonopah Test Range in south central Nevada. Closure for these sites will be completed by excavating and evaluating the condition of each artillery round (if found); detonating the rounds (if necessary); excavating the impacted soil and debris; collecting verification samples; backfilling the excavations; disposing of the impacted soil and debris at an approved low-level waste repository at the Nevada Test Site

  14. Minimum Energy Dwelling (MED) workbook: an investigation of techniques and materials for energy conscious design

    Energy Technology Data Exchange (ETDEWEB)

    1977-12-01

    This workbook is based upon information gathered during the design phase of the Minimum Energy Dwelling. The objective of the project, sponsored by the Southern California Gas Co., Department of Energy, and Mission Viejo is to substantially reduce energy use by the incorporation of energy conservation and solar techniques in a single-family detached dwelling. The Project will demonstrate to builders, as well as to the general public, a number of technological innovations that can, at reasonable cost, be included in a dwelling design. The problem facing Southern California Gas Co., along with most other gas utilities, is ever-decreasing amounts of gas at increasing prices. The dwelling designed has approximately 1,150 ft/sup 2/, consistent with current home-building trends. Through the optimum use of energy-conserving appliances, insulation, window and wall shading, exterior coloring, and thermal mass, the yearly energy usage has been reduced by over 50%. Of the remaining 50% of the energy required for heating, cooling, and domestic hot water, the majority is supplied by the solar-energy system. Three hundred twenty square feet (270 effective) of evacuated tube collector are incorporated into the building structure. The hot water provided by the collectors is used to run an absorption chiller for cooling, the domestic hot water, and the heating system. The remaining energy requirements are met by an auxiliary natural gas energy system and a cool-air-economizer cycle.

  15. Corrective Action Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5 Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    D. S. Tobiason

    2000-08-01

    Area 3 Septic Waste Systems 1 and 5 are located in Area 3 of the Tonopah Test Range (TTR) (Figure 1). The site is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as Corrective Action Unit (CAU) 428 and includes Corrective Action Sites 03-05-002-SW01 (Septic Waste System 1 [SWS 1]), and 03-05-002-SW05 (Septic Waste System 5 [SWS 5]). The site history for the CAU is provided in the Corrective Action Investigation Plan (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999). SWS 1 consists of two leachfields and associated septic tanks. SWS 1 received effluent from both sanitary and industrial sources from various buildings in Area 3 of the TTR (Figure 2). SWS 5 is comprised of one leachfield and outfall with an associated septic tank. SWS 5 received effluent from sources in Building 03-50 in Area 3 of the TTR (Figure 2). Both systems were active until 1990 when a consolidated sewer system was installed. The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 3 SWS 1 and 5. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during May and June 1999. Samples of the tank contents, leachfield soil, and soil under the tanks and pipes were collected. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE/NV, 2000). Additional sampling was done in May 2000, the results of which are presented in this plan. Soil sample results indicated that two constituents of concern were detected above Preliminary Action Levels (PALs). Total arsenic was detected at a concentration of 68.7 milligrams per kilogram (mg/kg). The arsenic was found under the center distribution line at the proximal end of the SWS 5 Leachfield (Figure 3). Total benzo(a)pyrene was detected at a concentration of 480 micrograms per kilogram ({micro}g/kg). The benzo(a)pyrene was found in the soil under the

  16. The potential for improving welfare standards and productivity in United Kingdom sheep flocks using veterinary flock health plans.

    Science.gov (United States)

    Scott, P R; Sargison, N D; Wilson, D J

    2007-05-01

    Data from industry sources detailing variable costs in 2003 revealed that the average farmer keeping 1000 lowland ewes in the United Kingdom spent 3500 UK pounds annually on veterinary fees and medicines. Despite such expenditure, psoroptic mange and cutaneous myiasis are common in the UK, resistance to one or more anthelmintic group is not only common but increasing in frequency and distribution, and abortion outbreaks caused by Toxoplasma gondii and Chlamydophila abortus are frequently reported by veterinary laboratories. Welfare concerns also arise from farmers' intransigence towards tail docking and castration in lambs (mutilations), reported market forces necessitating long distance road transportation to slaughter plants, and an unwillingness to employ veterinary surgeons for obstetrical problems. The spread of sheep scab in the UK over the past decade illustrates the failure of flock owners to effect rudimentary biosecurity and disease control measures. A first step towards improving the health and welfare of sheep would be the immediate implementation of basic good husbandry practices, including ectoparasiticide treatment for sheep scab eradication, prophylaxis for cutaneous myiasis in selected lambs, and appropriate vaccination strategies for clostridial diseases and certain abortion agents. There would also be money from within current farm expenditure to provide veterinary attention for obstetrical problems affecting up to 2% of ewes per annum. Planned use of ecto- and endoparasiticides is urgently needed to maintain the efficacy of these unique drugs.

  17. Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Gustafason, D.L.

    2001-01-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential

  18. Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    On December 21, 1989, the EPA placed the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) on the National Priorities List (NPL). On January 1, 1992, a Federal Facilities Agreement (FFA) between the DOE Field Office in Oak Ridge (DOE-OR), EPA Region IV, and the Tennessee Department of Environment and Conservation (TDEC) went into effect. This FFA establishes the procedural framework and schedule by which DOE-OR will develop, coordinate, implement and monitor environmental restoration activities on the ORR in accordance with applicable federal and state environmental regulations. The DOE-OR Environmental Restoration Program for the ORR addresses the remediation of areas both within and outside the ORR boundaries. This sampling and analysis plan focuses on confirming the cleanup of the stretch of EFPC flowing from Lake Reality at the Y-12 Plant through the City of Oak Ridge, to Poplar Creek on the ORR and its associated floodplain. Both EFPC and its floodplain have been contaminated by releases from the Y-12 Plant since the mid-1950s. Because the EFPC site-designated as an ORR operable unit (OU) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) is included on the NPL, its remediation must follow the specific procedures mandated by CERCLA, as amended by the Superfund Amendments and Reauthorization Act in 1986

  19. MRP-227 Reactor vessel internals inspection planning and initial results at the Oconee nuclear station unit 2

    International Nuclear Information System (INIS)

    Davidsaver, S.B.; Fyfitch, S.; Whitaker, D.E.; Doss, R.L.

    2015-01-01

    The U.S. PWR industry has pro-actively developed generic inspection requirements and standards for reactor vessel (RV) internals. The Electric Power Research Institute (EPRI) Pressurized Water Reactor (PWR) Materials Reliability Program (MRP) has issued MRP-227-A and MRP-228 with mandatory and needed requirements based on the Nuclear Energy Institute (NEI) document NEI 03-08. The inspection and evaluation guidelines contained in MRP-227-A consider eight age-related degradation mechanisms: stress corrosion cracking (SCC), irradiation-assisted stress corrosion cracking (IASCC), wear, fatigue, thermal aging embrittlement, irradiation embrittlement, void swelling and irradiation growth, and thermal and irradiation-enhanced stress relaxation or irradiation-enhanced creep. This paper will discuss the decision planning efforts required for implementing the MRP-227-A and MRP-228 requirements and the results of these initial inspections at the Oconee Nuclear power station (ONS) units. Duke Energy and AREVA overcame a significant technology and NDE challenge by successfully completing the first-of-a-kind MRP-227-A scope requirements at ONS-1 in one outage below the estimated dose and with zero safety issues or events. This performance was repeated at ONS-2 a year later. The remote NDE tooling and processes developed to examine the MRP-227-A scope for ONS-1 and ONS-2 are transferable to other PWRs

  20. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  1. Advanced scale conditioning agent (ASCA) planning, application experience, and results at Seabrook and D.C. Cook unit 2

    Energy Technology Data Exchange (ETDEWEB)

    Ramaley, D.; Forney, M. [Westinghouse Electric Company LLC, Cranberry Township, Pennsylvania (United States); Rocheleau, M. [Next Era Energy, Seabrook Nuclear Plant, Seabrook, New Hampshire (United States); Shimunek, C.; Monk, P [American Electric Power, Cook Nuclear Plant, Bridgman, Michigan (United States)

    2012-07-01

    ASCA technology has been applied more than thirty-five times worldwide since its inception in 2000. This technology has continually grown in popularity since its development as a result of the many process benefits while maintaining minimal outage impacts. Utilities have applied ASCAs for a variety of reasons including: • Partial removal of secondary side deposit inventory • Improvement in sludge removal quantity over traditional mechanical cleaning processes • Reduction of tube support plate (TSP) blockage • Improvement in steam generator thermal performance • Partial dissolution and softening of consolidated top of tubesheet (TTS) collars In addition to several international ASCA applications, two U.S. ASCA applications were performed in 2011 and 2012. In 2011, a TTS ASCA application was performed at Seabrook Station Nuclear Plant. The TTS application was the third ASCA to be executed at the plant; Seabrook performed full bundle ASCAs in 2008 and 2009. In 2012, a full bundle maintenance cleaning ASCA was implemented at D.C. Cook Unit 2. This was the first ASCA application to be executed by the utility. This paper will discuss both the Westinghouse and utility perspective on ASCA application planning, site execution, and process results for TTS and full bundle applications. (author)

  2. Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-04-06

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  3. Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    On December 21, 1989, the EPA placed the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) on the National Priorities List (NPL). On January 1, 1992, a Federal Facilities Agreement (FFA) between the DOE Field Office in Oak Ridge (DOE-OR), EPA Region IV, and the Tennessee Department of Environment and Conservation (TDEC) went into effect. This FFA establishes the procedural framework and schedule by which DOE-OR will develop, coordinate, implement and monitor environmental restoration activities on the ORR in accordance with applicable federal and state environmental regulations. The DOE-OR Environmental Restoration Program for the ORR addresses the remediation of areas both within and outside the ORR boundaries. This sampling and analysis plan focuses on confirming the cleanup of the stretch of EFPC flowing from Lake Reality at the Y-12 Plant through the City of Oak Ridge, to Poplar Creek on the ORR and its associated floodplain. Both EFPC and its floodplain have been contaminated by releases from the Y-12 Plant since the mid-1950s. Because the EFPC site-designated as an ORR operable unit (OU) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) is included on the NPL, its remediation must follow the specific procedures mandated by CERCLA, as amended by the Superfund Amendments and Reauthorization Act in 1986.

  4. STREAMLINED APPROACH FOR ENVIRONMENTAL RESTORATION PLAN FOR CORRECTIVE ACTION UNIT 116: AREA 25 TEST CELL C FACILITY NEVADA TEST SITE, NEVADA

    International Nuclear Information System (INIS)

    2006-01-01

    This Streamlined Approach for Environmental Restoration Plan identifies the activities required for the closure of Corrective Action Unit 116, Area 25 Test Cell C Facility. The Test Cell C Facility is located in Area 25 of the Nevada Test Site approximately 25 miles northwest of Mercury, Nevada

  5. Application for verification of monitor units of the treatment planning system; Aplicacion para la verificacion de unidades monitor del sistema de planificacion de tratamientos

    Energy Technology Data Exchange (ETDEWEB)

    Suero Rodrigo, M. A.; Marques Fraguela, E.

    2011-07-01

    Current estimates algorithms achieve acceptable degree of accuracy. However, operate on the basis of un intuitive models. It is therefore necessary to verify the calculation of monitor units of the treatment planning system (PTS) with those obtained by other independent formalisms. To this end, we have developed an application based on factorization formalism that automates the calculation of dose.

  6. Business planning for scientists and engineers

    Energy Technology Data Exchange (ETDEWEB)

    Servo, J.C.; Hauler, P.D.

    1992-03-01

    Business Planning for Scientists and Engineers is a combination text/workbook intended for use by individuals and firms having received Phase II SBIR funding (Small Business Innovation Research). It is used to best advantage in combination with other aspects of the Commercialization Assistance Project developed by Dawnbreaker for the US Department of Energy. Although there are many books on the market which indicate the desired contents of a business plan, there are none which clearly indicate how to find the needed information. This book focuses on the how of business planning: how to find the needed information; how to keep yourself honest about the market potential; how to develop the plan; how to sell and use the plan.

  7. Surveillance plan for the early detection of H5N1 highly pathogenic avian influenza virus in migratory birds in the United States: surveillance year 2009

    Science.gov (United States)

    Brand, Christopher J.

    2009-01-01

    Executive Summary: This Surveillance Plan (Plan) describes plans for conducting surveillance of wild birds in the United States and its Territories and Freely-Associated States to provide for early detection of the introduction of the H5N1 Highly Pathogenic Avian Influenza (HPAI) subtype of the influenza A virus by migratory birds during the 2009 surveillance year, spanning the period of April 1, 2009 - March 31, 2010. The Plan represents a continuation of surveillance efforts begun in 2006 under the Interagency Strategic Plan for the Early Detection of H5N1 Highly Pathogenic Avian Influenza in Wild Migratory Birds (U.S. Department of Agriculture and U.S. Department of the Interior, 2006). The Plan sets forth sampling plans by: region, target species or species groups to be sampled, locations of sampling, sample sizes, and sampling approaches and methods. This Plan will be reviewed annually and modified as appropriate for subsequent surveillance years based on evaluation of information from previous years of surveillance, changing patterns and threats of H5N1 HPAI, and changes in funding availability for avian influenza surveillance. Specific sampling strategies will be developed accordingly within each of six regions, defined here as Alaska, Hawaiian/Pacific Islands, Lower Pacific Flyway (Washington, Oregon, California, Idaho, Nevada, Arizona), Central Flyway, Mississippi Flyway, and Atlantic Flyway.

  8. Wilmar Planning Tool, user guide

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Helge V.

    2006-01-15

    This is a short user guide to the Wilmar Planning Tool developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (Contract No. ENK5-CT-2002-00663). A User Shell implemented in an Excel workbook controls the Wilmar Planning Tool. All data are contained in Access databases that communicate with various sub-models through text files that are exported from or imported to the databases. In the User Shell various scenario variables and control parameters are set, and export of model data from the input database, activation of the models, as well as import of model results to the output database are triggered from the shell. (au)

  9. Wilmar Planning Tool, user guide

    International Nuclear Information System (INIS)

    Larsen, Helge V.

    2006-01-01

    This is a short user guide to the Wilmar Planning Tool developed in the project Wind Power Integration in Liberalised Electricity Markets (WILMAR) supported by EU (Contract No. ENK5-CT-2002-00663). A User Shell implemented in an Excel workbook controls the Wilmar Planning Tool. All data are contained in Access databases that communicate with various sub-models through text files that are exported from or imported to the databases. In the User Shell various scenario variables and control parameters are set, and export of model data from the input database, activation of the models, as well as import of model results to the output database are triggered from the shell. (au)

  10. Space shuttle/payload interface analysis. Volume 4: Business Risk and Value of Operations in Space (BRAVO). Part 3: Workbook

    Science.gov (United States)

    1974-01-01

    A collection of blank worksheets for use on each BRAVO problem to be analyzed is supplied, for the purposes of recording the inputs for the BRAVO analysis, working out the definition of mission equipment, recording inputs to the satellite synthesis computer program, estimating satellite earth station costs, costing terrestrial systems, and cost effectiveness calculations. The group of analysts working BRAVO will normally use a set of worksheets on each problem, however, the workbook pages are of sufficiently good quality that the user can duplicate them, if more worksheet blanks are required than supplied. For Vol. 1, see N74-12493; for Vol. 2, see N74-14530.

  11. The Oncor Geodatabase for the Columbia Estuary Ecosystem Restoration Program: Handbook of Data Reduction Procedures, Workbooks, and Exchange Templates

    Energy Technology Data Exchange (ETDEWEB)

    Sather, Nichole K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Borde, Amy B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Diefenderfer, Heida L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Serkowski, John A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Coleman, Andre M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Gary E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-12-01

    This Handbook of Data Reduction Procedures, Workbooks, and Exchange Templates is designed to support the Oncor geodatabase for the Columbia Estuary Ecosystem Restoration Program (CEERP). The following data categories are covered: water-surface elevation and temperature, sediment accretion rate, photo points, herbaceous wetland vegetation cover, tree plots and site summaries, fish catch and density, fish size, fish diet, fish prey, and Chinook salmon genetic stock identification. The handbook is intended for use by scientists collecting monitoring and research data for the CEERP. The ultimate goal of Oncor is to provide quality, easily accessible, geospatial data for synthesis and evaluation of the collective performance of CEERP ecosystem restoration actions at a program scale.

  12. Corrective Action Investigation Plan for Corrective Action Unit 409: Other Waste Sites, Tonopah Test Range, Nevada (Rev. 0)

    International Nuclear Information System (INIS)

    2000-01-01

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 409 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 409 consists of three Corrective Action Sites (CASs): TA-53-001-TAB2, Septic Sludge Disposal Pit No.1; TA-53-002-TAB2, Septic Sludge Disposal Pit No.2; and RG-24-001-RGCR, Battery Dump Site. The Septic Sludge Disposal Pits are located near Bunker Two, close to Area 3, on the Tonopah Test Range. The Battery Dump Site is located at the abandoned Cactus Repeater Station on Cactus Peak. The Cactus Repeater Station was a remote, battery-powered, signal repeater station. The two Septic Sludge Disposal Pits were suspected to be used through the late 1980s as disposal sites for sludge from septic tanks located in Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern are the same for the disposal pits and include: volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPHs) as gasoline- and diesel-range organics, polychlorinated biphenyls, Resource Conservation and Recovery Act metals, and radionuclides (including plutonium and depleted uranium). The Battery Dump Site consists of discarded lead-acid batteries and associated construction debris, placing the site in a Housekeeping Category and, consequently, no contaminants are expected to be encountered during the cleanup process. The corrective action the at this CAU will include collection of discarded batteries and construction debris at the Battery Dump Site for proper disposal and recycling, along with photographic documentation as the process progresses. The corrective action for the remaining CASs involves the collection of background radiological data through borings drilled at

  13. Corrective Action Investigation Plan for Corrective Action Unit 410: Waste Disposal Trenches, Tonopah Test Range, Nevada, Revision No.:0

    International Nuclear Information System (INIS)

    2002-01-01

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 410 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 410 is located on the Tonopah Test Range (TTR), which is included in the Nevada Test and Training Range (formerly the Nellis Air Force Range) approximately 140 miles northwest of Las Vegas, Nevada. This CAU is comprised of five Corrective Action Sites (CASs): TA-19-002-TAB2, Debris Mound; TA-21-003-TANL, Disposal Trench; TA-21-002-TAAL, Disposal Trench; 09-21-001-TA09, Disposal Trenches; 03-19-001, Waste Disposal Site. This CAU is being investigated because contaminants may be present in concentrations that could potentially pose a threat to human health and/or the environment, and waste may have been disposed of with out appropriate controls. Four out of five of these CASs are the result of weapons testing and disposal activities at the TTR, and they are grouped together for site closure based on the similarity of the sites (waste disposal sites and trenches). The fifth CAS, CAS 03-19-001, is a hydrocarbon spill related to activities in the area. This site is grouped with this CAU because of the location (TTR). Based on historical documentation and process know-ledge, vertical and lateral migration routes are possible for all CASs. Migration of contaminants may have occurred through transport by infiltration of precipitation through surface soil which serves as a driving force for downward migration of contaminants. Land-use scenarios limit future use of these CASs to industrial activities. The suspected contaminants of potential concern which have been identified are volatile organic compounds; semivolatile organic compounds; high explosives; radiological constituents including depleted uranium

  14. Corrective Action Plan for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    K. B. Campbell email = campbek@nv.doe.gov

    2002-01-01

    This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for Corrective Action Unit (CAU) 262, Area 25 Septic Systems and Underground Discharge Point. CAU 262 is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996. Remediation of CAU 262 is required under the FFACO. CAU 262 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles [mi]) northwest of Las Vegas, Nevada. The nine Corrective Action Sites (CASs) within CAU 262 are located in the Nuclear Rocket Development Station complex. Individual CASs are located in the vicinity of the Reactor Maintenance, Assembly, and Disassembly (R-MAD); Engine Maintenance, Assembly, and Disassembly (E-MAD); and Test Cell C compounds. CAU 262 includes the following CASs as provided in the FFACO (1996); CAS 25-02-06, Underground Storage Tank; CAS 25-04-06, Septic Systems A and B; CAS 25-04-07, Septic System; CAS 25-05-03, Leachfield; CAS 25-05-05, Leachfield; CAS 25-05-06, Leachfield; CAS 25-05-08, Radioactive Leachfield; CAS 25-05-12, Leachfield; and CAS 25-51-01, Dry Well. Figures 2, 3, and 4 show the locations of the R-MAD, the E-MAD, and the Test Cell C CASs, respectively. The facilities within CAU 262 supported nuclear rocket reactor engine testing. Activities associated with the program were performed between 1958 and 1973. However, several other projects used the facilities after 1973. A significant quantity of radioactive and sanitary waste was produced during routine operations. Most of the radioactive waste was managed by disposal in the posted leachfields. Sanitary wastes were disposed in sanitary leachfields. Septic tanks, present at sanitary leachfields (i.e., CAS 25-02-06,2504-06 [Septic Systems A and B], 25-04-07, 25-05-05,25-05-12) allowed solids to settle out of suspension prior to entering the leachfield. Posted leachfields do not contain septic tanks. All CASs located in CAU 262 are

  15. Corrective Action Investigation Plan for Corrective Action Unit 555: Septic Systems Nevada Test Site, Nevada, Rev. No.: 0 with Errata

    Energy Technology Data Exchange (ETDEWEB)

    Pastor, Laura

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada, and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by

  16. Spatial and temporal patterns in golden eagle diets in the western United States, with implications for conservation planning

    Science.gov (United States)

    Bedrosian, Geoffrey; Watson, James W.; Steenhof, Karen; Kochert, Michael N.; Preston, Charles R.; Woodbridge, Brian; Williams, Gary E.; Keller, Kent R.; Crandall, Ross H.

    2017-01-01

    Detailed information on diets and predatory ecology of Golden Eagles (Aquila chrysaetos) is essential to prioritize prey species management and to develop landscape-specific conservation strategies, including mitigation of the effects of energy development across the western United States. We compiled published and unpublished data on Golden Eagle diets to (1) summarize available information on Golden Eagle diets in the western U.S., (2) compare diets among biogeographic provinces, and (3) discuss implications for conservation planning and future research. We analyzed 35 studies conducted during the breeding season at 45 locations from 1940–2015. Golden Eagle diet differed among western ecosystems. Lower dietary breadth was associated with desert and shrub-steppe ecosystems and higher breadth with mountain ranges and the Columbia Plateau. Correlations suggest that percentage of leporids in the diet is the factor driving overall diversity of prey and percentage of other prey groups in the diet of Golden Eagles. Leporids were the primary prey of breeding Golden Eagles in 78% of study areas, with sciurids reported as primary prey in 18% of study areas. During the nonbreeding season, Golden Eagles were most frequently recorded feeding on leporids and carrion. Golden Eagles can be described as both generalist and opportunistic predators; they can feed on a wide range of prey species but most frequently feed on abundant medium-sized prey species in a given habitat. Spatial variations in Golden Eagle diet likely reflect regional differences in prey community, whereas temporal trends likely reflect responses to long-term change in prey populations. Evidence suggests dietary shifts from traditional (leporid) prey can have adverse effects on Golden Eagle reproductive rates. Land management practices that support or restore shrub-steppe ecosystem diversity should benefit Golden Eagles. More information is needed on nonbreeding-season diet to determine what food resources

  17. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2008-01-01

    This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (FFACO, 1996 (as amended February 2008)). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. (1) CAS 01-23-02, Atmospheric Test Site - High Alt; (2) CAS 02-23-02, Contaminated Areas (2); (3) CAS 02-23-03, Contaminated Berm; (4) CAS 02-23-10, Gourd-Amber Contamination Area; (5) CAS 02-23-11, Sappho Contamination Area; (6) CAS 02-23-12, Scuttle Contamination Area; (7) CAS 03-23-24, Seaweed B Contamination Area; (8) CAS 03-23-27, Adze Contamination Area; (9) CAS 03-23-28, Manzanas Contamination Area; (10) CAS 03-23-29, Truchas-Chamisal Contamination Area; (11) CAS 04-23-02, Atmospheric Test Site T4-a; (12) CAS 05-23-06, Atmospheric Test Site; (13) CAS 09-23-06, Mound of Contaminated Soil; (14) CAS 10-23-04, Atmospheric Test Site M-10; and (15) CAS 18-23-02, U-18d Crater (Sulky). Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107. CAU 107 closure activities will consist of verifying that the current postings required under Title 10 Code of Federal Regulations (CFR) Part 835 are in place and implementing use restrictions (URs) at two sites, CAS 03-23-29 and CAS 18-23-02. The current radiological postings combined with the URs are adequate administrative controls to limit site access and worker dose

  18. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2009-01-01

    This Streamlined Approach for Environmental Restoration Plan covers activities associated with Corrective Action Unit (CAU) 107 of the Federal Facility Agreement and Consent Order (1996 (as amended February 2008)). CAU 107 consists of the following Corrective Action Sites (CASs) located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site. (sm b ullet) CAS 01-23-02, Atmospheric Test Site - High Alt(sm b ullet) CAS 02-23-02, Contaminated Areas (2)(sm b ullet) CAS 02-23-03, Contaminated Berm(sm b ullet) CAS 02-23-10, Gourd-Amber Contamination Area(sm b ullet) CAS 02-23-11, Sappho Contamination Area(sm b ullet) CAS 02-23-12, Scuttle Contamination Area(sm b ullet) CAS 03-23-24, Seaweed B Contamination Area(sm b ullet) CAS 03-23-27, Adze Contamination Area(sm b ullet) CAS 03-23-28, Manzanas Contamination Area(sm b ullet) CAS 03-23-29, Truchas-Chamisal Contamination Area(sm b ullet) CAS 04-23-02, Atmospheric Test Site T4-a(sm b ullet) CAS 05-23-06, Atmospheric Test Site(sm b ullet) CAS 09-23-06, Mound of Contaminated Soil(sm b ullet) CAS 10-23-04, Atmospheric Test Site M-10(sm b ullet) CAS 18-23-02, U-18d Crater (Sulky) Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, engineering drawings, field screening, analytical results, and the results of data quality objectives process (Section 3.0), closure in place with administrative controls or no further action will be implemented for CAU 107.

  19. Perspectives on risk: Assessment of risk profiles and outcomes among women planning community birth in the United States.

    Science.gov (United States)

    Bovbjerg, Marit L; Cheyney, Melissa; Brown, Jennifer; Cox, Kim J; Leeman, Lawrence

    2017-09-01

    There is little agreement on who is a good candidate for community (home or birth center) birth in the United States. Data on n=47 394 midwife-attended, planned community births come from the Midwives Alliance of North America Statistics Project. Logistic regression quantified the independent contribution of 10 risk factors to maternal and neonatal outcomes. Risk factors included: primiparity, advanced maternal age, obesity, gestational diabetes, preeclampsia, postterm pregnancy, twins, breech presentation, history of cesarean and vaginal birth, and history of cesarean without history of vaginal birth. Models controlled additionally for Medicaid, race/ethnicity, and education. The independent contributions of maternal age and obesity were quite modest, with adjusted odds ratios (AOR) less than 2.0 for all outcomes: hospital transfer, cesarean, perineal trauma, postpartum hemorrhage, low/very-low Apgar, maternal or neonatal hospitalization, NICU admission, and fetal/neonatal death. Breech was strongly associated with morbidity and fetal/neonatal mortality (AOR 8.2, 95% CI, 3.7-18.4). Women with a history of both cesarean and vaginal birth fared better than primiparas across all outcomes; however, women with a history of cesarean but no prior vaginal births had poor outcomes, most notably fetal/neonatal demise (AOR 10.4, 95% CI, 4.8-22.6). Cesarean births were most common in the breech (44.7%), preeclampsia (30.6%), history of cesarean without vaginal birth (22.1%), and primipara (11.0%) groups. The outcomes of labor after cesarean in women with previous vaginal deliveries indicates that guidelines uniformly prohibiting labor after cesarean should be reconsidered for this subgroup. Breech presentation has the highest rate of adverse outcomes supporting management of vaginal breech labor in a hospital setting. © 2017 Wiley Periodicals, Inc.

  20. Corrective Action Investigation Plan for Corrective Action Unit 214: Bunkers and Storage Areas Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    2003-01-01

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 214 under the Federal Facility Agreement and Consent Order. Located in Areas 5, 11, and 25 of the Nevada Test Site, CAU 214 consists of nine Corrective Action Sites (CASs): 05-99-01, Fallout Shelters; 11-22-03, Drum; 25-99-12, Fly Ash Storage; 25-23-01, Contaminated Materials; 25-23-19, Radioactive Material Storage; 25-99-18, Storage Area; 25-34-03, Motor Dr/Gr Assembly (Bunker); 25-34-04, Motor Dr/Gr Assembly (Bunker); and 25-34-05, Motor Dr/Gr Assembly (Bunker). These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). The suspected contaminants and critical analyte s for CAU 214 include oil (total petroleum hydrocarbons-diesel-range organics [TPH-DRO], polychlorinated biphenyls [PCBs]), pesticides (chlordane, heptachlor, 4,4-DDT), barium, cadmium, chronium, lubricants (TPH-DRO, TPH-gasoline-range organics [GRO]), and fly ash (arsenic). The land-use zones where CAU 214 CASs are located dictate that future land uses will be limited to nonresidential (i.e., industrial) activities. The results of this field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the corrective action decision document

  1. Corrective Action Investigation Plan for Corrective Action Unit 99: Rainier Mesa/Shoshone Mountain, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    McCord, John

    2004-01-01

    This Corrective Action Investigation Plan (CAIP) was developed for Corrective Action Unit (CAU) 99, Rainier Mesa/Shoshone Mountain. The CAIP is a requirement of the ''Federal Facility Agreement and Consent Order'' (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD) (FFACO, 1996). The FFACO addresses environmental restoration activities at U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) facilities and sites including the underground testing area(s) of the Nevada Test Site (NTS). This CAIP describes the investigation activities currently planned for the Rainier Mesa/Shoshone Mountain CAU. These activities are consistent with the current Underground Test Area (UGTA) Project strategy described in Section 3.0 of Appendix VI, Revision No. 1 (December 7, 2000) of the FFACO (1996) and summarized in Section 2.1.2 of this plan. The Rainier Mesa/Shoshone Mountain CAU extends over several areas of the NTS (Figure 1-1) and includes former underground nuclear testing locations in Areas 12 and 16. The area referred to as ''Rainier Mesa'' includes the geographical area of Rainier Mesa proper and the contiguous Aqueduct Mesa. Figure 1-2 shows the locations of the tests (within tunnel complexes) conducted at Rainier Mesa. Shoshone Mountain is located approximately 20 kilometers (km) south of Rainier Mesa, but is included within the same CAU due to similarities in their geologic setting and in the nature and types of nuclear tests conducted. Figure 1-3 shows the locations of the tests conducted at Shoshone Mountain. The Rainier Mesa/Shoshone Mountain CAU falls within the larger-scale Rainier Mesa/Shoshone Mountain Investigation Area, which also includes the northwest section of the Yucca Flat CAU as shown in Figure 1-1. Rainier Mesa and Shoshone Mountain lie adjacent to the Timber Mountain Caldera Complex and are composed of volcanic rocks that erupted from the

  2. Outcomes of care for 16,924 planned home births in the United States: the Midwives Alliance of North America Statistics Project, 2004 to 2009.

    Science.gov (United States)

    Cheyney, Melissa; Bovbjerg, Marit; Everson, Courtney; Gordon, Wendy; Hannibal, Darcy; Vedam, Saraswathi

    2014-01-01

    Between 2004 and 2010, the number of home births in the United States rose by 41%, increasing the need for accurate assessment of the safety of planned home birth. This study examines outcomes of planned home births in the United States between 2004 and 2009. We calculated descriptive statistics for maternal demographics, antenatal risk profiles, procedures, and outcomes of planned home births in the Midwives Alliance of North American Statistics Project (MANA Stats) 2.0 data registry. Data were analyzed according to intended and actual place of birth. Among 16,924 women who planned home births at the onset of labor, 89.1% gave birth at home. The majority of intrapartum transfers were for failure to progress, and only 4.5% of the total sample required oxytocin augmentation and/or epidural analgesia. The rates of spontaneous vaginal birth, assisted vaginal birth, and cesarean were 93.6%, 1.2%, and 5.2%, respectively. Of the 1054 women who attempted a vaginal birth after cesarean, 87% were successful. Low Apgar scores (home births in the United States, outcomes are congruent with the best available data from population-based, observational studies that evaluated outcomes by intended place of birth and perinatal risk factors. Low-risk women in this cohort experienced high rates of physiologic birth and low rates of intervention without an increase in adverse outcomes. © 2014 by the American College of Nurse-Midwives.

  3. Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

    1993-07-01

    This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan)

  4. Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

    1993-07-01

    This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

  5. Influence of timber harvesting costs on the layout of cuttings and economic return in forest planning based on dynamic treatment units

    Directory of Open Access Journals (Sweden)

    Adrián Pascual

    2018-05-01

    Full Text Available Aim of study: To analyze the influence of harvesting costs on the distribution and type of cuttings when forest management planning is based on the dynamic treatment units (DTUs approach. Area of study: A Mediterranean pine forest in Central Spain. Materials and methods: Airborne laser scanning data were used in area-based approach to predict stand attributes and delineate segments that were used as calculation units. Predicted stand attributes and existing models for diameter distribution and individual-tree growth were used to simulate alternative management schedules for each segment for a 60-year planning horizon divided into three 20-year periods. Three alternative forest planning problems were formulated. They aimed to maximize or minimize net income, or maximize timber production with a constant flow of harvested timber. Spatial goals were used in all cases to enhance the clustering of treatments. Main results: Maxizing timber production without considering harvesting costs can be costly, even close to the plan that minimized net incomes. Maximizing net incomes led to frequent use of final felling instead of thinnings, placing cuttings near forest roads and creating more compact DTUs than obtained in the plan that maximized timber production. Research highlights: Compared to previous studies on DTUs, this study integrated felling and forwarding costs, which depended on distance to road and stand attributes, in the process of creating DTUs by means of spatial optimization.

  6. Shape Up and Ship Out.

    Science.gov (United States)

    Leibowitz, Zandy; And Others

    1994-01-01

    United Parcel Service's career development system takes multiple approaches: information from career discussions between supervisors and supervisees and a career planning workbook and guide is used for individual career planning, district master operating plans, and the management appraisal process. (SK)

  7. Automated treatment planning for a dedicated multi-source intracranial radiosurgery treatment unit using projected gradient and grassfire algorithms.

    Science.gov (United States)

    Ghobadi, Kimia; Ghaffari, Hamid R; Aleman, Dionne M; Jaffray, David A; Ruschin, Mark

    2012-06-01

    The purpose of this work is to develop a framework to the inverse problem for radiosurgery treatment planning on the Gamma Knife(®) Perfexion™ (PFX) for intracranial targets. The approach taken in the present study consists of two parts. First, a hybrid grassfire and sphere-packing algorithm is used to obtain shot positions (isocenters) based on the geometry of the target to be treated. For the selected isocenters, a sector duration optimization (SDO) model is used to optimize the duration of radiation delivery from each collimator size from each individual source bank. The SDO model is solved using a projected gradient algorithm. This approach has been retrospectively tested on seven manually planned clinical cases (comprising 11 lesions) including acoustic neuromas and brain metastases. In terms of conformity and organ-at-risk (OAR) sparing, the quality of plans achieved with the inverse planning approach were, on average, improved compared to the manually generated plans. The mean difference in conformity index between inverse and forward plans was -0.12 (range: -0.27 to +0.03) and +0.08 (range: 0.00-0.17) for classic and Paddick definitions, respectively, favoring the inverse plans. The mean difference in volume receiving the prescribed dose (V(100)) between forward and inverse plans was 0.2% (range: -2.4% to +2.0%). After plan renormalization for equivalent coverage (i.e., V(100)), the mean difference in dose to 1 mm(3) of brainstem between forward and inverse plans was -0.24 Gy (range: -2.40 to +2.02 Gy) favoring the inverse plans. Beam-on time varied with the number of isocenters but for the most optimal plans was on average 33 min longer than manual plans (range: -17 to +91 min) when normalized to a calibration dose rate of 3.5 Gy/min. In terms of algorithm performance, the isocenter selection for all the presented plans was performed in less than 3 s, while the SDO was performed in an average of 215 min. PFX inverse planning can be performed using

  8. Automated treatment planning for a dedicated multi-source intracranial radiosurgery treatment unit using projected gradient and grassfire algorithms

    Energy Technology Data Exchange (ETDEWEB)

    Ghobadi, Kimia; Ghaffari, Hamid R.; Aleman, Dionne M.; Jaffray, David A.; Ruschin, Mark [Department of Mechanical and Industrial Engineering, University of Toronto, 5 King' s College Road, Toronto, Ontario M5S 3G8 (Canada); Department of Radiation Oncology, University of Toronto, Radiation Medicine Program, Princess Margaret Hospital, 610 University Avenue, Toronto, Ontario M5G 2M9 (Canada)

    2012-06-15

    Purpose: The purpose of this work is to develop a framework to the inverse problem for radiosurgery treatment planning on the Gamma Knife{sup Registered-Sign} Perfexion Trade-Mark-Sign (PFX) for intracranial targets. Methods: The approach taken in the present study consists of two parts. First, a hybrid grassfire and sphere-packing algorithm is used to obtain shot positions (isocenters) based on the geometry of the target to be treated. For the selected isocenters, a sector duration optimization (SDO) model is used to optimize the duration of radiation delivery from each collimator size from each individual source bank. The SDO model is solved using a projected gradient algorithm. This approach has been retrospectively tested on seven manually planned clinical cases (comprising 11 lesions) including acoustic neuromas and brain metastases. Results: In terms of conformity and organ-at-risk (OAR) sparing, the quality of plans achieved with the inverse planning approach were, on average, improved compared to the manually generated plans. The mean difference in conformity index between inverse and forward plans was -0.12 (range: -0.27 to +0.03) and +0.08 (range: 0.00-0.17) for classic and Paddick definitions, respectively, favoring the inverse plans. The mean difference in volume receiving the prescribed dose (V{sub 100}) between forward and inverse plans was 0.2% (range: -2.4% to +2.0%). After plan renormalization for equivalent coverage (i.e., V{sub 100}), the mean difference in dose to 1 mm{sup 3} of brainstem between forward and inverse plans was -0.24 Gy (range: -2.40 to +2.02 Gy) favoring the inverse plans. Beam-on time varied with the number of isocenters but for the most optimal plans was on average 33 min longer than manual plans (range: -17 to +91 min) when normalized to a calibration dose rate of 3.5 Gy/min. In terms of algorithm performance, the isocenter selection for all the presented plans was performed in less than 3 s, while the SDO was performed in an

  9. Automated treatment planning for a dedicated multi-source intracranial radiosurgery treatment unit using projected gradient and grassfire algorithms

    International Nuclear Information System (INIS)

    Ghobadi, Kimia; Ghaffari, Hamid R.; Aleman, Dionne M.; Jaffray, David A.; Ruschin, Mark

    2012-01-01

    Purpose: The purpose of this work is to develop a framework to the inverse problem for radiosurgery treatment planning on the Gamma Knife ® Perfexion™ (PFX) for intracranial targets. Methods: The approach taken in the present study consists of two parts. First, a hybrid grassfire and sphere-packing algorithm is used to obtain shot positions (isocenters) based on the geometry of the target to be treated. For the selected isocenters, a sector duration optimization (SDO) model is used to optimize the duration of radiation delivery from each collimator size from each individual source bank. The SDO model is solved using a projected gradient algorithm. This approach has been retrospectively tested on seven manually planned clinical cases (comprising 11 lesions) including acoustic neuromas and brain metastases. Results: In terms of conformity and organ-at-risk (OAR) sparing, the quality of plans achieved with the inverse planning approach were, on average, improved compared to the manually generated plans. The mean difference in conformity index between inverse and forward plans was −0.12 (range: −0.27 to +0.03) and +0.08 (range: 0.00–0.17) for classic and Paddick definitions, respectively, favoring the inverse plans. The mean difference in volume receiving the prescribed dose (V 100 ) between forward and inverse plans was 0.2% (range: −2.4% to +2.0%). After plan renormalization for equivalent coverage (i.e., V 100 ), the mean difference in dose to 1 mm 3 of brainstem between forward and inverse plans was −0.24 Gy (range: −2.40 to +2.02 Gy) favoring the inverse plans. Beam-on time varied with the number of isocenters but for the most optimal plans was on average 33 min longer than manual plans (range: −17 to +91 min) when normalized to a calibration dose rate of 3.5 Gy/min. In terms of algorithm performance, the isocenter selection for all the presented plans was performed in less than 3 s, while the SDO was performed in an average of 215 min

  10. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  11. The Relationship of Values in Elementary School 4th Grade Social Studies Textbook with the Attainments and Their Level of Being Included in Student Workbooks

    Science.gov (United States)

    Kilic, Abdurrahman

    2012-01-01

    In this study, the relationship of values in elementary school 4th grade Social Studies textbook with the attainments and their level of being included in student workbook are tried to be determined. Case study, which is a qualitative research method, was applied for this research. To collect data, document analysis technique, which is among the…

  12. Cooperative Project To Develop a Database of Discipline-Specific Workbook Exercises for Agricultural and Biological Engineering, Entomology, and Biological Sciences Courses.

    Science.gov (United States)

    Ellsbury, Susan H.; And Others

    A two-part text, "Science Resources: A Self-Paced Instructional Workbook," was designed to provide science students at Mississippi State University with: (1) instruction on basic library usage and reference tools common to most scientific disciplines; (2) materials adapted to specific disciplines; and (3) services available to them from the…

  13. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

  14. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan

  15. Short and long-term career plans of final year dental students in the United Arab Emirates.

    Science.gov (United States)

    Rashid, Hazim H; Ghotane, Swapnil G; Abufanas, Salem H; Gallagher, Jennifer E

    2013-08-13

    New dental schools have been established to train dentists in many parts of the world. This study examines the future dental workforce from the first dental school in the United Arab Emirates [UAE]; the aim of this study was to explore the short and long-term career aspirations of the final year dental students in the UAE in relation to their demography. Final year dental students of the Ajman University's College of Dentistry (n=87) were invited to participate in a self-completion questionnaire survey. Descriptive analysis, chi-square tests, and binary logistic regression analysis were carried out on career aspirations using SPSS v20. Eighty-two percent of students (n=71) responded, the majority of whom were female (65%; n=46). Ethnicity was reported as: 'other Arab' (61%; n=43), 'Emirati' (17%, n=12), and 'Other' (21%, n=15). In the short-term, 41% (n=29) expressed a desire to work in government training centres, with Emirati students significantly more likely to do so (p=0.002). 'Financial stability' (80%; n=57) and 'gaining professional experience' (76%; n=54) emerged as the most important influences on their short-term career plans. The vast majority of students wished to specialise in dentistry (92%; n=65) in the longer term; logistic regression analysis revealed that the odds of specialising in the most popular specialties of Orthodontics and Oral and Maxillofacial Surgery were less for the 'Other' ethnic group when compared with 'Emirati' students (0.26; 95% CI 0.068-0.989; p=0.04). Almost three-quarters of the students overall (72%; n=51) intended to work full-time. 'High income/financial security' (97%; n=69), 'standard of living' (97%; n=69), 'work/life balance' (94%; n=67), and 'professional fulfilment' (87%; n=62) were reported by the students as the most influential items affecting their long-term professional career choices. The findings suggest that students aspire to make a long-term contribution to the profession and there is a high level of

  16. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the activities necessary to close Corrective Action Unit (CAU) 398: Area 25 Spill Sites. CAU 398, located in Area 25 of the Nevada Test Site, is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996), and consists of the following 13 Corrective Action Sites (CASs) (Figure 1): (1) CAS 25-44-01 , a fuel spill on soil that covers a concrete pad. The origins and use of the spill material are unknown, but the spill is suspected to be railroad bedding material. (2) CAS 25-44-02, a spill of liquid to the soil from leaking drums. (3) CAS 25-44-03, a spill of oil from two leaking drums onto a concrete pad and surrounding soil. (4) CAS 25-44-04, a spill from two tanks containing sulfuric acid and sodium hydroxide used for a water demineralization process. (5) CAS 25-25-02, a fuel or oil spill from leaking drums that were removed in 1992. (6) CAS 25-25-03, an oil spill adjacent to a tipped-over drum. The source of the drum is not listed, although it is noted that the drum was removed in 1991. (7) CAS 25-25-04, an area on the north side of the Engine-Maintenance, Assembly, and Disassembly (E-MAD) facility, where oils and cooling fluids from metal machining operations were poured directly onto the ground. (8) CAS 25-25-05, an area of oil and/or hydraulic fluid spills beneath the heavy equipment once stored there. (9) CAS 25-25-06, an area of diesel fuel staining beneath two generators that have since been removed. (10) CAS 25-25-07, an area of hydraulic oil spills associated with a tunnel-boring machine abandoned inside X-Tunnel. (11) CAS 25-25-08, an area of hydraulic fluid spills associated with a tunnel-boring machine abandoned inside Y-Tunnel. (12) CAS 25-25-16, a diesel fuel spill from an above-ground storage tank located near Building 3320 at Engine Test Stand-1 (ETS-1) that was removed in 1998. (13) CAS 25-25-17, a hydraulic oil spill

  17. Corrective Action Investigation Plan for Corrective Action Unit 98: Frenchman Flat, Nevada Test Site, Nevada (Revision 1)

    Energy Technology Data Exchange (ETDEWEB)

    USDOE/NV

    1999-07-01

    This Corrective Action Investigation Plan (CAIP) has been developed for Frenchman Flat Corrective Action Unit (CAU) 98. The Frenchman Flat CAU is located along the eastern border of the Nevada Test Site (NTS) and includes portions of Areas 5 and 11. The Frenchman Flat CAU constitutes one of several areas of the Nevada Test Site used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in the vicinity as well as downgradient of the underground test areas. The CAIP describes the Corrective Action Investigation (CAI) to be conducted at the Frenchman Flat CAU to evaluate the extent of contamination in groundwater due to the underground nuclear testing. The Frenchman Flat CAI will be conducted by the Underground Test Area (UGTA) Project which is a part of the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Environmental Restoration Project. The CAIP is a requirement of the Federal Facility Agreement and Consent Order (FFACO) (1996 ) agreed to by the U.S. Department of Energy (DOE), the Nevada Division of Environmental Protection (NDEP), and the U.S. Department of Defense (DoD). Based on the general definition of a CAI from Section IV.14 of the FFACO, the purpose of the CAI is ''...to gather data sufficient to characterize the nature, extent, and rate of migration or potential rate of migration from releases or discharges of pollutants or contaminants and/or potential releases or discharges from corrective action units identified at the facilities...'' (FFACO, 1996). However, for the Underground Test Area (UGTA) CAUs, ''...the objective of the CAI process is to define boundaries around each UGTA CAU that establish areas that contain water that may be unsafe for domestic and municipal use.'', as stated in Appendix VI of the FFACO (1996). According to the UGTA strategy (Appendix VI of the FFACO), the CAI of a given CAU starts with the evaluation of the existing data. New

  18. Approach and plan for cleanup actions in the 100-IU-2 and 100-IU-6 Operable Units of the Hanford Site

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of this document is to summarize waste site information gathered to date relating to the 100-IU-2 and 100-IU-6 Operable Units (located at the Hanford Site in Richland, Washington), and to plan the extent of evaluation necessary to make cleanup decisions for identified waste sites under the Comprehensive Environmental Response, Compensation, and Liability Act of 1981. This is a streamlined approach to the decision-making process, reducing the time and costs for document preparation and review

  19. Data Base Management Plan for the remedial investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-10-01

    This Data Base Management Plan describes the gathering, verifying, analyzing, reporting, and archiving of data generated during the remedial investigation of Waste Area Grouping 10, Operable Unit 3. This investigation will produce data documenting wellhead surveys, well headspace gas pressure measurements, geophysical surveys, water level measurements, and borehole geophysical logs. Close Support Laboratory analyses will be performed on well headspace gas and well water samples

  20. Understanding determinants of government and consumer behavior relative to product safety : an application of the theory of planned behavior to China and the United States

    OpenAIRE

    Domke, Laura

    2008-01-01

    The following thesis applies Icek Ajzen's Theory of Planned Behavior to explain consumer and government response to safety of Chinese-made products sold in China and the United States. The thesis relies on secondary data as it considers the responses and actions relative to product safety by four different groups: Chinese government, U.S. government, Chinese consumers and U.S. consumers. Increased globalization has heightened the need for a better understanding and agreement...

  1. Streamlined approach for environmental restoration plan for corrective action unit 430, buried depleted uranium artillery round No. 1, Tonopah test range

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This plan addresses actions necessary for the restoration and closure of Corrective Action Unit (CAU) No. 430, Buried Depleted Uranium (DU) Artillery Round No. 1 (Corrective Action Site No. TA-55-003-0960), a buried and unexploded W-79 Joint Test Assembly (JTA) artillery test projectile with high explosives (HE), at the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Tonopah Test Range (TTR) in south-central Nevada. It describes activities that will occur at the site as well as the steps that will be taken to gather adequate data to obtain a notice of completion from Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented in accordance with the Federal Facility Agreement and Consent Order (FFACO) and the Resource Conservation and Recovery Act (RCRA) Industrial Sites Quality Assurance Project Plan.

  2. Earth Observing System/Meteorological Satellite (EOS/METSAT). Advanced Microwave Sounding Unit-A (AMSU-A) Contamination Control Plan

    Science.gov (United States)

    Fay, M.

    1998-01-01

    This Contamination Control Plan is submitted in response the Contract Document requirements List (CDRL) 007 under contract NAS5-32314 for the Earth Observing System (EOS) Advanced Microwave Sounding Unit A (AMSU-A). In response to the CDRL instructions, this document defines the level of cleanliness and methods/procedures to be followed to achieve adequate cleanliness/contamination control, and defines the required approach to maintain cleanliness/contamination control through shipping, observatory integration, test, and flight. This plan is also applicable to the Meteorological Satellite (METSAT) except where requirements are identified as EOS-specific. This plan is based on two key factors: a. The EOS/METSAT AMSU-A Instruments are not highly contamination sensitive. b. Potential contamination of other EOS Instruments is a key concern as addressed in Section 9/0 of the Performance Assurance Requirements for EOS/METSAT Integrated Programs AMSU-A Instrument (MR) (NASA Specification S-480-79).

  3. Streamlined approach for environmental restoration plan for corrective action unit 430, buried depleted uranium artillery round No. 1, Tonopah test range

    International Nuclear Information System (INIS)

    1996-09-01

    This plan addresses actions necessary for the restoration and closure of Corrective Action Unit (CAU) No. 430, Buried Depleted Uranium (DU) Artillery Round No. 1 (Corrective Action Site No. TA-55-003-0960), a buried and unexploded W-79 Joint Test Assembly (JTA) artillery test projectile with high explosives (HE), at the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Tonopah Test Range (TTR) in south-central Nevada. It describes activities that will occur at the site as well as the steps that will be taken to gather adequate data to obtain a notice of completion from Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented in accordance with the Federal Facility Agreement and Consent Order (FFACO) and the Resource Conservation and Recovery Act (RCRA) Industrial Sites Quality Assurance Project Plan

  4. Data Base Design with GIS in Ecosystem Based Multiple Use Forest Management in Artvin, Turkey: A Case Study in Balcı Forest Management Planning Unit.

    Science.gov (United States)

    Yolasığmaz, Hacı Ahmet; Keleş, Sedat

    2009-01-01

    In Turkey, the understanding of planning focused on timber production has given its place on Multiple Use Management (MUM). Because the whole infrastructure of forestry with inventory system leading the way depends on timber production, some cases of bottle neck are expected during the transition period. Database design, probably the most important stage during the transition to MUM, together with the digital basic maps making up the basis of this infrastructure constitute the main point of this article. Firstly, the forest management philosophy of Turkey in the past was shortly touched upon in the article. Ecosystem Based Multiple Use Forest Management (EBMUFM) approaches was briefly introduced. The second stage of the process of EBMUFM, database design was described by examining the classical planning infrastructure and the coverage to be produced and consumed were suggested in the form of lists. At the application stage, two different geographical databases were established with GIS in Balcı Planning Unit of the years 1984 and 2006. Following that the related basic maps are produced. Timely diversity of the planning unit of 20 years is put forward comparatively with regard to the stand parameters such as tree types, age class, development stage, canopy closure, mixture, volume and increment.

  5. Proposed Plan for Interim Remedial Actions at the 100-NR-1 Source Sites Operable Unit and the 100-NR-2 Groundwater Operable Unit

    International Nuclear Information System (INIS)

    Mukherjee, B.

    1998-02-01

    This Proposed Plan summary includes brief descriptions of the key issues for the 100-N Area contaminated soil and groundwater. This summary is intended as a simplified introduction to readers who might not be familiar with the contaminated site cleanup process or Hanford Site issues. The detailed Proposed Plan is attached to this summary. Some of the buildings and surrounding soils in the 100 Area of the Hanford Site were contaminated during operation of the nuclear reactors. The contamination poses a potential threat to public health and/or the environment. The potential threat to the public is exposure to people on or near the site to radiation and chemicals. The potential threat to the environment is contamination in the soil that has migrated to the groundwater and could eventually harm the Columbia River. Because of these potential threats, the Federal Government decided that the 100 Area was a high priority for cleanup and placed it on the National Priorities List

  6. United States Department of Energy Richland Field Office Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    International Nuclear Information System (INIS)

    1992-02-01

    The US Department of Energy (DOE) Order 5400.1 (DOE 1988a), General Environmental Protection Program, establishes environmental protection program requirements, authorities, and responsibilities to ensure that DOE operations are in compliance with applicable Federal, State and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 requires that each DOE Field Office prepare a plan for implementing the requirements of this order and update the plan annually. Therefore, this update to the US Department of Energy -- Richland Operations Office Environmental Protection Implementation Plan (DOE-RL 1989a), initially prepared November 9, 1989, is being issued

  7. United States Department of Energy Richland Field Office Environmental Protection Implementation Plan, November 9, 1992--November 9, 1993

    International Nuclear Information System (INIS)

    1992-11-01

    The US Department of Energy (DOE) Order 5400.1 (DOE 1988a), General Environmental Protection Program, establishes environmental protection program requirements, authorities, and responsibilities to ensure that DOE operations are in compliance with applicable Federal, State and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 requires that each DOE Field Office prepare a plan for implementing the requirements of this order and update the plan annually. This update to the US Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (DOE-RL 1989a), initially prepared November 9, 1989, is being issued to comply with the order

  8. Plan de formación continuada en una unidad de gestión clínica Continuing training plan in a clinical management unit

    Directory of Open Access Journals (Sweden)

    Fernando Miguel Gamboa Antiñolo

    2011-10-01

    Full Text Available La Unidad de Continuidad Asistencial está orientada a la atención de pacientes frágiles, pluripatológicos y de cuidados paliativos. Atiende a pacientes en domicilio, consulta, unidad de día, consultoría telefónica y en dos hospitales de la misma área sanitaria. Desde su inicio en 2002 como unidad de gestión, la formación ha sido un elemento prioritario de desarrollo. Los elementos clave son acercar la formación al lugar de trabajo, incluir aspectos fundamentales de los problemas asistenciales más prevalentes en el trabajo diario, orientar la formación a todo el personal incluyendo aspectos organizativos, de seguridad del paciente y su entorno, mejora del clima laboral, desarrollo de nuevas habilidades y conocimientos apoyados en la asistencia basada en la evidencia para el desarrollo de las diferentes competencias profesionales. La unidad puede ser el escenario idóneo para acometer las necesarias reformas conceptuales de la formación de los profesionales que permitan mejorar la calidad asistencial.Continuing Care Unit (UCA focused the attention of frail patients, polypathological patients and palliative care. UCA attend patients at home, consulting, day unit, telephone consulting and in two hospitals of the health area. From 2002 UCA began as a management unit, training has been a priority for development. Key elements include: providing education to the workplace, including key aspects of the most prevalent health care problems in daily work, directing training to all staff including organizational aspects of patient safety and the environment, improved working environment, development of new skills and knowledge supported by the evidence-based care for the development of different skills. The unit can be the ideal setting to undertake the reforms necessary conceptual training of professionals to improve the quality of care.

  9. 75 FR 13253 - Plan Revision for Lake Tahoe Basin Management Unit, Alpine, El Dorado, and Placer Counties, CA...

    Science.gov (United States)

    2010-03-19

    ... approved in 1988, there have been changes in economic, social, and ecological conditions, new policies and... effect. The 2000 Planning Rule's transition provisions (36 CFR 219.35) --amended in 2002 and 2003, and...

  10. United States Department of Energy Field Office, Richland, Environmental Protection Implementation Plan, November 9, 1990--November 9, 1991

    International Nuclear Information System (INIS)

    Paasch, R.A.

    1991-09-01

    The US Department of Energy (DOE) Order 5400.1 (DOE 1988a), General Environmental Protection Program, establishes environmental protection program requirements, authorities, and responsibilities to ensure that DOE operations are in compliance with applicable federal, state and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 requires that each field organization prepare a plan for implementing the requirements of this order and update this plan annually. Therefore, this update to the US Department of Energy -- Richland Operations Office Environmental Protection Implementation Plan for the Hanford Site, Richland, Washington, initially prepared November 9, 1989, is being issued. Responsibility for coordinating preparation of the annual update of this plan is assigned to the US Department of Energy Field Office, Richland, Safety and Environment Division's Environmental Oversight Branch

  11. United States family planning providers' knowledge of and attitudes towards preexposure prophylaxis for HIV prevention: a national survey.

    Science.gov (United States)

    Seidman, Dominika; Carlson, Kimberly; Weber, Shannon; Witt, Jacki; Kelly, Patricia J

    2016-05-01

    The Centers for Disease Control and Prevention defines HIV prevention as a core family planning service. The HIV community identified family planning visits as key encounters for women to access preexposure prophylaxis (PrEP) for HIV prevention. No studies explore US family planning providers' knowledge of and attitudes towards PrEP. We conducted a national survey of clinicians to understand barriers and facilitators to PrEP implementation in family planning. Family planning providers recruited via website postings, national meetings, and email completed an anonymous survey in 2015. Descriptive statistics were performed. Among 604 respondents, 495 were eligible for analysis and 342 were potential PrEP prescribers (physicians, nurse practitioners, midwives or physicians assistants). Among potential prescribers, 38% correctly defined PrEP [95% confidence interval (CI): 32.5-42.8], 37% correctly stated the efficacy of PrEP (95% CI: 32.0-42.4), and 36% chose the correct HIV test after a recent exposure (95% CI: 30.6-40.8). Characteristics of those who answered knowledge questions correctly included age less than 35 years, practicing in the Northeast or West, routinely offering HIV testing, providing rectal sexually transmitted infection screening or having seen any PrEP guidelines. Even among providers in the Northeast and West, the proportion of respondents answering questions correctly was less than 50%. Thirty-six percent of respondents had seen any PrEP guidelines. Providers identified lack of training as the main barrier to PrEP implementation; 87% wanted PrEP education. To offer comprehensive HIV prevention services, family planning providers urgently need training on PrEP and HIV testing. US family planning providers have limited knowledge about HIV PrEP and HIV testing, and report lack of provider training as the main barrier to PrEP provision. Provider education is needed to ensure that family planning clients access comprehensive HIV prevention methods

  12. Actor-Partner Interdependence Model Analysis of Sexual Communication and Relationship/Family Planning Factors Among Immigrant Latino Couples in the United States.

    Science.gov (United States)

    Matsuda, Yui

    2017-05-01

    The Latino population in the United States is quickly growing, and its unintended pregnancy rate is increasing. To decrease unintended pregnancies, couples must mutually agree on family planning. Communication between partners is one key factor identified in successful family planning for couples. Therefore, the purpose of this study was to examine sexual communication and its associations with sexual relationship power, general communication, and views on family planning. The Actor-Partner Interdependence Model was used to analyze dyadic influences of the chosen variables. Forty immigrant Latino couples were recruited from prenatal care clinics. The study results were grouped according to the three types of power structures: exhibition of men's traditional machismo values, exhibition of women's increased power in their relationships, and exhibition of men's and women's own empowerment with sexual communication. There was a negative association between men's views on family planning and women's sexual communication (exhibition of machismo values); a negative association between women's sexual relationship power and their partners' sexual communication (exhibition of women's increased power); and positive associations between men's and women's general communication and sexual communication (exhibition of men's and women's own empowerment). Dyadic influences of sexual communication and associated variables need to be incorporated into interventions to facilitate family planning for couples.

  13. Actor–Partner Interdependence Model Analysis of Sexual Communication and Relationship/Family Planning Factors Among Immigrant Latino Couples in the United States

    Science.gov (United States)

    Matsuda, Yui

    2017-01-01

    The Latino population in the United States is quickly growing, and its unintended pregnancy rate is increasing. To decrease unintended pregnancies, couples must mutually agree on family planning. Communication between partners is one key factor identified in successful family planning for couples. Therefore, the purpose of this study was to examine sexual communication and its associations with sexual relationship power, general communication, and views on family planning. The Actor–Partner Interdependence Model was used to analyze dyadic influences of the chosen variables. Forty immigrant Latino couples were recruited from prenatal care clinics. The study results were grouped according to the three types of power structures: exhibition of men’s traditional machismo values, exhibition of women’s increased power in their relationships, and exhibition of men’s and women’s own empowerment with sexual communication. There was a negative association between men’s views on family planning and women’s sexual communication (exhibition of machismo values); a negative association between women’s sexual relationship power and their partners’ sexual communication (exhibition of women’s increased power); and positive associations between men’s and women’s general communication and sexual communication (exhibition of men’s and women’s own empowerment). Dyadic influences of sexual communication and associated variables need to be incorporated into interventions to facilitate family planning for couples. PMID:27367797

  14. [Diffusion of clinical governance among the Italian Local Health Units (LHUs). Analysis of the Health Surveys, the Firm Acts and the Health Plans].

    Science.gov (United States)

    de Belvis, A G; Biasco, A; Pelone, F; Romaniello, A; De Micco, F; Volpe, M; Ricciardi, W

    2009-01-01

    The objective of our research is to report on the diffusion of Clinical Governance, as introduced with the National Health Plan 2006-2008, by analysing the planning instruments set up by each Region (Regional Health Plans and Emergency Plans in regions with budget deficit), the organizational frameworks (Atti Aziendali, firm acts), and the surveys on performance and quality of healthcare among the Italian Local Health Units (Health Surveys). Our research was realized on September-December 2007 and consisted of the collection of all retrieved documents available on the web and on the online public access catalog (OPAC SBN) of the National Library Service. Futhermore, each document has been classified and analysed according to Chambers' Clinical Governance definition. A descriptive statistical and inferential analysis by applying the Chi-2 Test was performed to test the correlation between the diffusion of such a classified documents and the geographical partition of each LHU. Our results show a scarce diffusion of Firm acts (43%) and Health Surveys (24.9% of the total). Any remind to Clinical Governance instruments and methods inside each document resulted even poorer among both the organizational and performance surveys and the regional health planning frameworks, respectively.

  15. Perinatal and maternal outcomes in planned home and obstetric unit births in women at 'higher risk' of complications: secondary analysis of the Birthplace national prospective cohort study.

    Science.gov (United States)

    Li, Y; Townend, J; Rowe, R; Brocklehurst, P; Knight, M; Linsell, L; Macfarlane, A; McCourt, C; Newburn, M; Marlow, N; Pasupathy, D; Redshaw, M; Sandall, J; Silverton, L; Hollowell, J

    2015-04-01

    To explore and compare perinatal and maternal outcomes in women at 'higher risk' of complications planning home versus obstetric unit (OU) birth. Prospective cohort study. OUs and planned home births in England. 8180 'higher risk' women in the Birthplace cohort. We used Poisson regression to calculate relative risks adjusted for maternal characteristics. Sensitivity analyses explored possible effects of differences in risk between groups and alternative outcome measures. Composite perinatal outcome measure encompassing 'intrapartum related mortality and morbidity' (intrapartum stillbirth, early neonatal death, neonatal encephalopathy, meconium aspiration syndrome, brachial plexus injury, fractured humerus or clavicle) and neonatal admission within 48 hours for more than 48 hours. Two composite maternal outcome measures capturing intrapartum interventions/adverse maternal outcomes and straightforward birth. The risk of 'intrapartum related mortality and morbidity' or neonatal admission for more than 48 hours was lower in planned home births than planned OU births [adjusted relative risks (RR) 0.50, 95% CI 0.31-0.81]. Adjustment for clinical risk factors did not materially affect this finding. The direction of effect was reversed for the more restricted outcome measure 'intrapartum related mortality and morbidity' (RR adjusted for parity 1.92, 95% CI 0.97-3.80). Maternal interventions were lower in planned home births. The babies of 'higher risk' women who plan birth in an OU appear more likely to be admitted to neonatal care than those whose mothers plan birth at home, but it is unclear if this reflects a real difference in morbidity. Rates of intrapartum related morbidity and mortality did not differ statistically significantly between settings at the 5% level but a larger study would be required to rule out a clinically important difference between the groups. © 2015 The Authors. BJOG An International Journal of Obstetrics and Gynaecology published by John

  16. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 121: Storage Tanks and Miscellaneous Sites, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 121, Storage Tanks and Miscellaneous Sites. CAU 121 is currently listed in Appendix III of the ''Federal Facility Agreement and Consent Order'' (FFACO, 1996) and consists of three Corrective Action Sites (CASs) located in Area 12 of the Nevada Test Site (NTS): CAS 12-01-01, Aboveground Storage Tank; CAS 12-01-02, Aboveground Storage Tank; and CAS 12-22-26, Drums; 2 AST's. CASs 12-01-01 and 12-01-02 are located to the west of the Area 12 Camp, and CAS 12-22-26 is located near the U-12g Tunnel, also known as G-tunnel, in Area 12 (Figure 1). The aboveground storage tanks (ASTs) present at CASs 12-01-01 and 12-01-02 will be removed and disposed of at an appropriate facility. Soil below the ASTs will be sampled to identify whether it has been impacted with chemicals or radioactivity above action levels. If impacted soil above action levels is present, the soil will be excavated and disposed of at an appropriate facility. The CAS 12-22-26 site is composed of two overlapping areas, one where drums had formerly been stored, and the other where an AST was used to dispense diesel for locomotives used at G-tunnel. This area is located above an underground radioactive materials area (URMA), and within an area that may have elevated background radioactivity because of containment breaches during nuclear tests and associated tunnel reentry operations. CAS 12-22-26 does not include the URMA or the elevated background radioactivity. An AST that had previously been used to store liquid magnesium chloride (MgCl) was properly disposed of several years ago, and releases from this tank are not an environmental concern. The diesel AST will be removed and disposed of at an appropriate facility. Soil at the former drum area and the diesel AST area will be sampled to identify whether it has been impacted by releases, from the drums or the

  17. Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Grant Evenson

    2012-05-01

    Corrective Action Unit (CAU) 550 is located in Areas 7, 8, and 10 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 550, Smoky Contamination Area, comprises 19 corrective action sites (CASs). Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plumes, it was determined that some of the CAS releases are co-located and will be investigated as study groups. This document describes the planned investigation of the following CASs (by study group): (1) Study Group 1, Atmospheric Test - CAS 08-23-04, Atmospheric Test Site T-2C; (2) Study Group 2, Safety Experiments - CAS 08-23-03, Atmospheric Test Site T-8B - CAS 08-23-06, Atmospheric Test Site T-8A - CAS 08-23-07, Atmospheric Test Site T-8C; (3) Study Group 3, Washes - Potential stormwater migration of contaminants from CASs; (4) Study Group 4, Debris - CAS 08-01-01, Storage Tank - CAS 08-22-05, Drum - CAS 08-22-07, Drum - CAS 08-22-08, Drums (3) - CAS 08-22-09, Drum - CAS 08-24-03, Battery - CAS 08-24-04, Battery - CAS 08-24-07, Batteries (3) - CAS 08-24-08, Batteries (3) - CAS 08-26-01, Lead Bricks (200) - CAS 10-22-17, Buckets (3) - CAS 10-22-18, Gas Block/Drum - CAS 10-22-19, Drum; Stains - CAS 10-22-20, Drum - CAS 10-24-10, Battery. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed

  18. Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada

    International Nuclear Information System (INIS)

    Evenson, Grant

    2012-01-01

    Corrective Action Unit (CAU) 550 is located in Areas 7, 8, and 10 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 550, Smoky Contamination Area, comprises 19 corrective action sites (CASs). Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plumes, it was determined that some of the CAS releases are co-located and will be investigated as study groups. This document describes the planned investigation of the following CASs (by study group): (1) Study Group 1, Atmospheric Test - CAS 08-23-04, Atmospheric Test Site T-2C; (2) Study Group 2, Safety Experiments - CAS 08-23-03, Atmospheric Test Site T-8B - CAS 08-23-06, Atmospheric Test Site T-8A - CAS 08-23-07, Atmospheric Test Site T-8C; (3) Study Group 3, Washes - Potential stormwater migration of contaminants from CASs; (4) Study Group 4, Debris - CAS 08-01-01, Storage Tank - CAS 08-22-05, Drum - CAS 08-22-07, Drum - CAS 08-22-08, Drums (3) - CAS 08-22-09, Drum - CAS 08-24-03, Battery - CAS 08-24-04, Battery - CAS 08-24-07, Batteries (3) - CAS 08-24-08, Batteries (3) - CAS 08-26-01, Lead Bricks (200) - CAS 10-22-17, Buckets (3) - CAS 10-22-18, Gas Block/Drum - CAS 10-22-19, Drum; Stains - CAS 10-22-20, Drum - CAS 10-24-10, Battery. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed

  19. Subsurface Interim Measures/Interim Remedial Action Plan and Decision Document for the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This MIRA is to be conducted to provide information that will aid in the selection and design of final remedial actions at OU2 that will address removal of suspected free-phase volatile organic compound (VOC) contamination. The Plan involves investigating the removal of residual free-phase VOCs by in situ vacuum-enhanced vapor extraction technology at 3 suspected VOC source areas within OU2. VOC-contaminated vapors extracted from the subsurface would be treated by granular activated carbon (GAC) adsorption and discharged. The Plan also includes water table depression, when applicable at the test sites, to investigate the performance of vapor extraction technology in the saturated zone. The Plan provides for treatment of any contaminated ground water recovered during the IM/IRA at existing RFP treatment facilities. The proposed MVIRA Plan is presented in the document entitled ''Proposed Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2, '' dated 20 March 1992. Information concerning the proposed Subsurface IM/IRA was presented during a DOE Quarterly Review meeting held on 07 April 1992 and a public meeting held on 07 May 1992, at the Marriott Hotel in Golden, Colorado. The Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to date to DOE during the public comment period

  20. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  1. Corrective Action Investigation Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    ITLV

    1999-01-01

    The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation

  2. United States Department of Energy Richland Operations Office Environmental Protection Implementation Plan: November 9, 1993, to November 9, 1994

    International Nuclear Information System (INIS)

    1993-11-01

    The hub of today's programs at the Hanford Site are activities dedicated to managing stored and new wastes and cleanup of waste sites. To ensure focused planning and implementing efforts for these programs, management of the site is assigned to DOE's Office of Environmental Restoration and Waste Management. This report describes policies and procedures in the following areas: Compliance activities; Environmental restoration; Waste management; and Technology development. Procedures for notification of environmental occurrences, long-range environmental protection planning and reporting, waste management programs; environmental monitoring programs, and quality assurance and data verification are also described and discussed

  3. A method for co-creation of an evidence-based patient workbook to address alcohol use when quitting smoking in primary care: a case study.

    Science.gov (United States)

    Minian, Nadia; Noormohamed, Aliya; Zawertailo, Laurie; Baliunas, Dolly; Giesbrecht, Norman; Le Foll, Bernard; Rehm, Jürgen; Samokhvalov, Andriy; Selby, Peter L

    2018-01-01

    The purpose of this paper is to describe a patient engagement event designed to create an educational workbook with smokers who drink alcohol at harmful levels. The goal was to create a workbook that combined scientific evidence with patients' values, preferences, and needs. Fourteen adult smokers who drink alcohol were invited to the Centre for Addiction and Mental Health (CAMH) to take part in a four-hour event to help design the workbook with the CAMH research team. Participants provided their opinions and ideas to create an outline for the workbook, including activities, images, and titles. The workbook - called Self-Awareness - is currently being offered in a smoking cessation program in 221 primary care clinics across Ontario to help smokers quit or reduce their harmful alcohol use. The patient engagement event was a useful way to co-create educational materials that incorporate both scientific research and patient needs. Background Evidence-based medicine is the integration of best research evidence with clinical expertise and patient values. There are few methodologies on how to design evidence-based programs and resources to include patient values. The latter is an important aspect of patient-centered care, and is essential for patients to trust the recommendations and empower them as consumers to make informed choices. This manuscript describes a participatory research approach to design patient-facing educational materials that incorporate both evidence-based and community-sensitive principles. These materials are intended to support smokers to reduce or stop harmful alcohol consumption. Methods Adult smokers who report consuming alcohol were invited to a co-creation meeting at the Centre for Addiction and Mental Health's Nicotine Dependence Service to guide the adaptation of evidence-based materials. The four-hour event consisted of individual reflections, group discussions, and consensus-building interactions. Detailed notes were taken and then

  4. Bridging an interdisciplinary gap: a case for uniting tourism and urban planning for a consistent understanding of the

    Science.gov (United States)

    Holly E. Bosley; Gene L. Brothers

    2009-01-01

    Both tourism researchers and urban planners use the term "tourist bubble" to describe a geographic area in a destination within which visitors operate. However, there is an interdisciplinary disparity in the conceptualization of the tourist bubble. This paper aims to more clearly describe the intersection of tourism and urban planning research, as well as to...

  5. Social learning in a policy-mandated collaboration: Community wildfire protection planning in the eastern United States

    Science.gov (United States)

    Rachel F. Brummel; Kristen C. Nelson; Pamela J. Jakes; Daniel R. Williams

    2010-01-01

    Policies such as the US Healthy Forests Restoration Act (HFRA) mandate collaboration in planning to create benefits such as social learning and shared understanding among partners. However, some question the ability of top-down policy to foster successful local collaboration. Through in-depth interviews and document analysis, this paper investigates social learning and...

  6. The Back Office of School Reform: Educational Planning Units in German-Speaking Switzerland (1960s and 1970s)

    Science.gov (United States)

    Bosche, Anne

    2016-01-01

    The present article investigates what consequences for educational policy and/or educational administration were drawn from the upheavals of the 1960s and 1970s. A popular diagnosis in political science is that political decision-makers were pushed into a "reactive" role. In the context of a general "planning euphoria", and an…

  7. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 538: Spill Sites, Nevada Test Site, Nevada, Rev. No.: 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2006-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 538: Spill Sites, Nevada Test Site, Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]). (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk. (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Division of Environmental Protection (NDEP) and where DOE will reach consensus with NDEP before beginning the next phase of work.

  8. Spatial prediction of Lactarius deliciosus and Lactarius salmonicolor mushroom distribution with logistic regression models in the Kızılcasu Planning Unit, Turkey.

    Science.gov (United States)

    Mumcu Kucuker, Derya; Baskent, Emin Zeki

    2015-01-01

    Integration of non-wood forest products (NWFPs) into forest management planning has become an increasingly important issue in forestry over the last decade. Among NWFPs, mushrooms are valued due to their medicinal, commercial, high nutritional and recreational importance. Commercial mushroom harvesting also provides important income to local dwellers and contributes to the economic value of regional forests. Sustainable management of these products at the regional scale requires information on their locations in diverse forest settings and the ability to predict and map their spatial distributions over the landscape. This study focuses on modeling the spatial distribution of commercially harvested Lactarius deliciosus and L. salmonicolor mushrooms in the Kızılcasu Forest Planning Unit, Turkey. The best models were developed based on topographic, climatic and stand characteristics, separately through logistic regression analysis using SPSS™. The best topographic model provided better classification success (69.3 %) than the best climatic (65.4 %) and stand (65 %) models. However, the overall best model, with 73 % overall classification success, used a mix of several variables. The best models were integrated into an Arc/Info GIS program to create spatial distribution maps of L. deliciosus and L. salmonicolor in the planning area. Our approach may be useful to predict the occurrence and distribution of other NWFPs and provide a valuable tool for designing silvicultural prescriptions and preparing multiple-use forest management plans.

  9. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Smith, J. L.

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS)

  10. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    J. L. Smith

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS).

  11. Surface Water Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document for South Walnut Creek Basin (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1991-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This IM/IRA is to be conducted to minimize the release from these areas of hazardous substances that pose a potential threat to the public health and environment. The Plan involved the collection of contaminated surface water at specific locations, treatment by chemical precipitation, cross-flow membrane filtration and granular activated carbon (GAC) adsorption, and surface discharge of treated water. Information for the initial configuration of the Plan is presented in the document entitled ''Proposed Interim Measures/Interim Remedial Action Plan and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2'' (IM/IRAP) dated 26 September 1990. Information concerning the proposed Surface Water IM/IRA was presented during a public meeting held from 7 to 10 p.m., Tuesday, 23 October 1990, at the Westminster City Park Recreation Center in Westminster, Colorado. This Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to DOE during the public comment period which ended 24 November 1990. There were a number of technical comments on the plan that DOE has addressed herein. It is noted that several major issues were raised by the comments. Regardless of the estimated low risk to the public from construction and water transport activities, the popular sentiment of the public, based on comments received, is strong concern over worker and public health risks from these activities. In the light of public and municipal concerns, DOE proposes to eliminate from this IM/IRA the interbasin transfer of Woman Creek seepage to the South Walnut Creek drainage and to address collection and treatment of contaminated South Walnut Creek and Woman Creek surface water under two separate IM/IRAs

  12. Birth Satisfaction Scale/Birth Satisfaction Scale-Revised (BSS/BSS-R): A large scale United States planned home birth and birth centre survey

    OpenAIRE

    Fleming, Susan E.; Donovan-Batson, Colleen.; Burduli, Ekaterina.; Barbosa-Leiker, Celestina.; Hollins Martin, Caroline J.; Martin, Colin R.

    2016-01-01

    Objective:\\ud to explore the prevalence of birth satisfaction for childbearing women planning to birth in their home or birth centers in the United States. Examining differences in birth satisfaction of the home and birth centers; and those who birthed in a hospital using the 30-item Birth Satisfaction Scale (BSS) and the 10-item Birth Satisfaction Scale-Revised (BSS-R).\\ud Study design:\\ud a quantitative survey using the BSS and BSS-R were employed. Additional demographic data were collected...

  13. 30 CFR 250.417 - What must I provide if I plan to use a mobile offshore drilling unit (MODU)?

    Science.gov (United States)

    2010-07-01

    ... both hurricane and non-hurricane seasons. If sufficient environmental information and data are not... requirements. You must provide information and data to demonstrate the drilling unit's capability to perform at the proposed drilling location. This information must include the maximum environmental and...

  14. Corrective Action Plan for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 151, Septic Systems and Discharge Area, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 151 consists of eight Corrective Action Sites (CASs) located in Areas 2, 12, and 18 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada

  15. Site productivity and forest carbon stocks in the United States: Analysis and implications for forest offset project planning

    Science.gov (United States)

    Coeli M. Hoover; James E. Smith

    2012-01-01

    The documented role of United States forests in sequestering carbon, the relatively low cost of forest-based mitigation, and the many co-benefits of increasing forest carbon stocks all contribute to the ongoing trend in the establishment of forest-based carbon offset projects. We present a broad analysis of forest inventory data using site quality indicators to provide...

  16. Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

  17. New source terms and the implications for emergency planning requirements at nuclear power plants in the United State

    International Nuclear Information System (INIS)

    Kaiser, G.D.; Cheok, M.C.

    1987-01-01

    This paper begins with a brief review of current approaches to source term driven changes to NRC emergency planning requirements and addresses significant differences between them. Approaches by IDCOR and EPRI, industry submittals to NRC and alternative risk-based evaluations have been considered. Important issues are discussed, such as the role of Protective Action Guides in determining the radius of the emergency planning zone (EPZ). The significance of current trends towards the prediction of longer warning times and longer durations of release in new source terms is assessed. These trends may help to relax the current notification time requirements. Finally, the implications of apparent support in the regulations for a threshold in warning time beyond which ad hoc protective measures are adequate is discussed

  18. Evaluation Of Open, Wedge Filtered And Half Block Profile For Single And Plan Parallel Field For 60Co Teletherapy Unit

    International Nuclear Information System (INIS)

    Heru-Prasetio; Nasukha; Soejoko, Djarwani S

    2003-01-01

    TPS shall be evaluated with experimental data before it is used for patient treatment. This experiment was performed using small water phantom, at the depth of 10 cm, SSD technique for single beam and 16 cm, SAD technique for plan parallel beam. Measuring device used in this experiment is Farmer 2571 detector. It was found differences between experiment and TPS iSis are not significant. Single field experiment and TPS differences of 0.6%, 3.6% and 0.1% for open, wedge filter and half-blocked field, for plan parallel experiment and TPS differences are 2.1%, 2% and 2.4% for open, wedge filter and half-blocked field. (author)

  19. TERRITORIAL LAND-USE PLANNING IN THE CONTEXT OF FORMATION THE FINANCIAL STABILITY OF THE UNITED LOCAL COMMUNITIES

    Directory of Open Access Journals (Sweden)

    Tretiak A.

    2017-02-01

    Full Text Available Territorial planning now is one of the essential attributes of management activities developed countries. The modern system of planning land- use in Ukraine now is not formed and balanced and does not provide positive results in achieving its high economic efficiency and environmental safety. Territorial planning of land use wasn’t needed by system of state and municipal administration because there are problems in the territorial land management which are related with insufficient compliance current needs of sustainable development. If planning of development in the cities (towns is developed and makes of base planning documentation (general plans then the area of land ownership and land use outside towns isn’t covered completely creation of land documents. In Ukraine in most scientific research view separate aspects of influence territorial use of planning the spatial organization of economic activities of local communities. For the new community situation in use land and natural resources became difficult, first of all through: -underestimation of the complexity and specificity of land reform during land and economic reforms in Ukraine; - local community hasn’t full information about rights to land and other natural resources, their potential use and protection of the state; - incompetence of system solving problems of land reform in the local councils, for example : remove communities from order of land in their territories, lands of state and municipal property aren’t separated, land reform and land tenure systems, especially in agriculture are incomplete; - unsatisfactory legal and information support and protection of property rights of villagers to land and other natural resources; - ignoring the problems of putting into economic turnover of land as a capital resource and integrated approach to village territories in development the transformation of land relations, absence of a balanced state land politics of planning of land

  20. Recent experience in planning, packaging and preparing non-commercial spent fuel for shipment within the United States

    International Nuclear Information System (INIS)

    Johnson, P.E.; Shappert, L.B.; Turner, D.W.

    1996-01-01

    US DOE orders dictate that the aluminium clad fuels now stored at ORNL will be shipped to the Savannah River Site. A number of activities had to be carried out in order to ready the fuel for shipping, including choosing a cask capable of transporting the fuel, repackaging the fuel, developing a transportation plan, identifying the appropriate routes, and carrying out a readiness self assessment. These tasks have been successfully completed and are discussed herein