WorldWideScience

Sample records for unit fort sheridan

  1. Final Sampling and Analysis Plan for Background Sampling, Fort Sheridan, Illinois

    National Research Council Canada - National Science Library

    1995-01-01

    .... This Background Sampling and Analysis Plan (BSAP) is designed to address this issue through the collection of additional background samples at Fort Sheridan to support the statistical analysis and the Baseline Risk Assessment (BRA...

  2. National uranium resource evaluation: Sheridan Quadrangle, Wyoming and Montana

    International Nuclear Information System (INIS)

    Damp, J.N.; Jennings, M.D.

    1982-04-01

    The Sheridan Quadrangle of north-central Wyoming was evaluated for uranium favorability according to specific criteria of the National Uranium Resource Evaluation program. Procedures consisted of geologic and radiometric surveys; rock, water, and sediment sampling; studying well logs; and reviewing the literature. Five favorable environments were identified. These include portions of Eocene Wasatch and Upper Cretaceous Lance sandstones of the Powder River Basin and Lower Cretaceous Pryor sandstones of the Bighorn Basin. Unfavorable environments include all Precambrian, Cambrian, Ordovician, Permian, Triassic, and Middle Jurassic rocks; the Cretaceous Thermopolis, Mowry, Cody, Meeteetse, and Bearpaw Formations; the Upper Jurassic Sundance and Morrison, the Cretaceous Frontier, Meseverde, Lance, and the Paleocene Fort Union and Eocene Willwood Formations of the Bighorn Basin; the Wasatch Formation of the Powder River Basin, excluding two favorable areas and all Oligocene and Miocene rocks. Remaining rocks are unevaluated

  3. National uranium resource evaluation: Sheridan Quadrangle, Wyoming and Montana

    Energy Technology Data Exchange (ETDEWEB)

    Damp, J N; Jennings, M D

    1982-04-01

    The Sheridan Quadrangle of north-central Wyoming was evaluated for uranium favorability according to specific criteria of the National Uranium Resource Evaluation program. Procedures consisted of geologic and radiometric surveys; rock, water, and sediment sampling; studying well logs; and reviewing the literature. Five favorable environments were identified. These include portions of Eocene Wasatch and Upper Cretaceous Lance sandstones of the Powder River Basin and Lower Cretaceous Pryor sandstones of the Bighorn Basin. Unfavorable environments include all Precambrian, Cambrian, Ordovician, Permian, Triassic, and Middle Jurassic rocks; the Cretaceous Thermopolis, Mowry, Cody, Meeteetse, and Bearpaw Formations; the Upper Jurassic Sundance and Morrison, the Cretaceous Frontier, Meseverde, Lance, and the Paleocene Fort Union and Eocene Willwood Formations of the Bighorn Basin; the Wasatch Formation of the Powder River Basin, excluding two favorable areas and all Oligocene and Miocene rocks. Remaining rocks are unevaluated.

  4. FIND: Fort Calhoun Station, Unit 2

    International Nuclear Information System (INIS)

    Williams, W.H.

    1976-07-01

    This index is presented for the microfiche material of Docket 50548 which concerns the application of Omaha Public Power District to build and operate Fort Calhoun Station, Unit 2. The information includes both application and review material dated from September 1975 through March 1976. There are five amendments to the PSAR and one supplement to the ER which have been incorporated by reference into the respective reports. Docket RESAR-3 is used as a reference for portions of the PSAR

  5. Hydrologic characterization for Spring Creek and hydrologic budget and model scenarios for Sheridan Lake, South Dakota, 1962-2007

    Science.gov (United States)

    Driscoll, Daniel G.; Norton, Parker A.

    2009-01-01

    The U.S. Geological Survey cooperated with South Dakota Game, Fish and Parks to characterize hydrologic information relevant to management of water resources associated with Sheridan Lake, which is formed by a dam on Spring Creek. This effort consisted primarily of characterization of hydrologic data for a base period of 1962 through 2006, development of a hydrologic budget for Sheridan Lake for this timeframe, and development of an associated model for simulation of storage deficits and drawdown in Sheridan Lake for hypothetical release scenarios from the lake. Historically, the dam has been operated primarily as a 'pass-through' system, in which unregulated outflows pass over the spillway; however, the dam recently was retrofitted with an improved control valve system that would allow controlled releases of about 7 cubic feet per second (ft3/s) or less from a fixed depth of about 60 feet (ft). Development of a hydrologic budget for Sheridan Lake involved compilation, estimation, and characterization of data sets for streamflow, precipitation, and evaporation. The most critical data need was for extrapolation of available short-term streamflow records for Spring Creek to be used as the long-term inflow to Sheridan Lake. Available short-term records for water years (WY) 1991-2004 for a gaging station upstream from Sheridan Lake were extrapolated to WY 1962-2006 on the basis of correlations with streamflow records for a downstream station and for stations located along two adjacent streams. Comparisons of data for the two streamflow-gaging stations along Spring Creek indicated that tributary inflow is approximately proportional to the intervening drainage area, which was used as a means of estimating tributary inflow for the hydrologic budget. Analysis of evaporation data shows that sustained daily rates may exceed maximum monthly rates by a factor of about two. A long-term (1962-2006) hydrologic budget was developed for computation of reservoir outflow from

  6. The Coast Artillery Journal. Volume 80, Number 6, November-December 1937

    Science.gov (United States)

    1937-12-01

    cluded in the trip were the posts of Fort Kamehameha and Fort DeRussy, where the big guns were given the once- over by the Congressmen. They all seemed...November-Decembt:,; batteries have been taking places at Fort Kamehameha . tember 13th and 20th, the following batteries fired their These are additional...55th COAST ARTIL- LERY 61st COAST ARTIL- Fort Kamehameha . T. H. LERY ~IA.JOR Fort Sheridan, III. Phillip’, \\\\’. S. CAPTAIX~ Dod~~. F. B .. ,Jr

  7. 76 FR 24479 - In the Matter of the Taylor Lumber and Treating Superfund Site, Sheridan, Oregon, Amendment to...

    Science.gov (United States)

    2011-05-02

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9300-9] In the Matter of the Taylor Lumber and Treating... Taylor Lumber and Treating Site, which PWPO was acquiring, in exchange for several obligations related to...-553- 0705. Comments should reference the Taylor Lumber and Treating Superfund Site in Sheridan, Oregon...

  8. It was Sheridan’s Fault Not Custer’s: LTG Sheridan’s Campaign Plans Against the Plains Indians and the Ties to Current Planning

    Science.gov (United States)

    2012-05-17

    two from the latter. The first column, led by BG Crook, maneuvered from south to north from Fort Fetterman , Wyoming Territory towards the confluence...secure all the Indian Agencies along the Missouri River. BG Crook conducted continuous offensive operations between Fort Fetterman and the newly...Fort Fetterman and the Powder River Cantonment. COL Miles and BG Crook executed the diplomatic line of effort. Both commanders used diplomacy and key

  9. Fortællingen

    DEFF Research Database (Denmark)

    Hejlsted, Annemette

    Fortællingen - teori og analyse introducerer til teorier om fortællingen og præsenterer et sæt af analytiske tilgange til fortællinger af enhver art. Bogen lægger vægt på læsersynsvinklen og retter opmærksomheden mod de vilkår for menings- og betydningsdannelse, der kendetegner fortællingen. Begr....... Begreber om plot, fortællingens verden, karakterer, fortæller, modus og genre behandles, og deres anvendelse demonstreres på dansk og nordisk litteratur - med inddragelse af eksempler fra film og tv-reklamer....

  10. FORTE spacecraft vibration mitigation. Final report

    International Nuclear Information System (INIS)

    Maly, J.R.

    1996-02-01

    This report documents work that was performed by CSA Engineering, Inc., for Los Alamos National Laboratory (LANL), to reduce vibrations of the FORTE spacecraft by retrofitting damped structural components into the spacecraft structure. The technical objective of the work was reduction of response at the location of payload components when the structure is subjected to the dynamic loading associated with launch and proto-qualification testing. FORTE is a small satellite that will be placed in orbit in 1996. The structure weighs approximately 425 lb, and is roughly 80 inches high and 40 inches in diameter. It was developed and built by LANL in conjunction with Sandia National Laboratories Albuquerque for the United States Department of Energy. The FORTE primary structure was fabricated primarily with graphite epoxy, using aluminum honeycomb core material for equipment decks and solar panel substrates. Equipment decks were bonded and bolted through aluminum mounting blocks to adjoining structure

  11. Fort Saint Vrain operational experience

    International Nuclear Information System (INIS)

    Fuller, C.H.

    1989-01-01

    Fort St. Vrain (FSV), on the system of the Public Service Company of Colorado, is the only high temperature gas-cooled (HTGR) power reactor in the United States. The plant features a helium-cooled reactor with a uranium-thorium fuel cycle. The paper describes the experience made during its operation. (author). 2 refs, 4 figs, 2 tabs

  12. A GIS-based vulnerability assessment of brine contamination to aquatic resources from oil and gas development in eastern Sheridan County, Montana.

    Science.gov (United States)

    Preston, Todd M; Chesley-Preston, Tara L; Thamke, Joanna N

    2014-02-15

    Water (brine) co-produced with oil in the Williston Basin is some of the most saline in the nation. The Prairie Pothole Region (PPR), characterized by glacial sediments and numerous wetlands, covers the northern and eastern portion of the Williston Basin. Sheridan County, Montana, lies within the PPR and has a documented history of brine contamination. Surface water and shallow groundwater in the PPR are saline and sulfate dominated while the deeper brines are much more saline and chloride dominated. A Contamination Index (CI), defined as the ratio of chloride concentration to specific conductance in a water sample, was developed by the Montana Bureau of Mines and Geology to delineate the magnitude of brine contamination in Sheridan County. Values >0.035 indicate contamination. Recently, the U.S. Geological Survey completed a county level geographic information system (GIS)-based vulnerability assessment of brine contamination to aquatic resources in the PPR of the Williston Basin based on the age and density of oil wells, number of wetlands, and stream length per county. To validate and better define this assessment, a similar approach was applied in eastern Sheridan County at a greater level of detail (the 2.59 km(2) Public Land Survey System section grid) and included surficial geology. Vulnerability assessment scores were calculated for the 780 modeled sections and these scores were divided into ten equal interval bins representing similar probabilities of contamination. Two surface water and two groundwater samples were collected from the section with the greatest acreage of Federal land in each bin. Nineteen of the forty water samples, and at least one water sample from seven of the ten selected sections, had CI values indicating contamination. Additionally, CI values generally increased with increasing vulnerability assessment score, with a stronger correlation for groundwater samples (R(2)=0.78) than surface water samples (R(2)=0.53). Copyright © 2013

  13. The Coast Artillery Journal. Volume 76, Number 5, September-October 1933

    Science.gov (United States)

    1933-10-01

    hindering such endeavor are lack of motive, lack of self-confidence, resentment, and fear or likelihood of personal sacrifice. These barren primary...between the Balkans and the Far East." At Plymouth there is a mockbattle between a "Q" boat and a submarine, the .spectators occupying the deck of an...52d, Fort Hancock. 2nd Lt. Robert J. Lawlor, assigned to 61st, Fort Sheridan. 2d Lt. Robert C. Leslie, to the Philip- pines for assignment, sailing New

  14. Cancer incidence in Fort Chipewyan, Alberta : 1995-2006

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Y. [Alberta Cancer Board, Edmonton, AB (Canada). Division of Population Health and Information Surveillance

    2009-02-15

    A high number of cases of cholangiocarcinoma, a rare form of bile duct cancer, as well as high rates of other cancers were reported by a physician working in Fort Chipewyan, Alberta in 2006. Concerns were raised by local residents, attributing cancers in their community to environmental contamination from a range of industrial development including the oil sands development, uranium mining and pulp mills. However, an initial review of the Alberta Cancer Registry did not confirm an increased incidence of cancer in Fort Chipewyan. In the summer/fall of 2007, a working group was formed to support the Alberta Cancer Board in doing a cluster investigation based on the guidelines of the United States Centre for Disease Control and Prevention. This report presented an investigation to determine if there was an elevated rate of cholangiocarcinoma in Fort Chipewyan and whether there was an elevated rate of cancers overall in Fort Chipewyan. The report provided background information on the Athabasca oil sands, uranium mining, and Fort Chipewyan as well as previous investigations of cancer incidence in Fort Chipewyan. Study methods were also presented with particular reference to study and comparison populations; cancer classification and inclusion criteria; active case ascertainment and verification; methods of analysis; and ethical approval. Results were also presented. The specific cancers that were discussed were cholangiocarcinoma, leukemia, colon cancer, and cancer in First Nations in Alberta. It was concluded that the observed number of cases of cholangiocarcinoma was within the expected range. 121 refs., 12 tabs., 3 figs., 5 appendices.

  15. The geology and mechanics of formation of the Fort Rock Dome, Yavapai County, Arizona

    Science.gov (United States)

    Fuis, Gary S.

    1996-01-01

    The Fort Rock Dome, a craterlike structure in northern Arizona, is the erosional product of a circular domal uplift associated with a Precambrian shear zone exposed within the crater and with Tertiary volcanism. A section of Precambrian to Quaternary rocks is described, and two Tertiary units, the Crater Pasture Formation and the Fort Rock Creek Rhyodacite, are named. A mathematical model of the doming process is developed that is consistent with the history of the Fort Rock Dome.

  16. Von Braun Rocket Team at Fort Bliss, Texas

    Science.gov (United States)

    1940-01-01

    The German Rocket Team, also known as the Von Braun Rocket Team, poses for a group photograph at Fort Bliss, Texas. After World War II ended in 1945, Dr. Wernher von Braun led some 120 of his Peenemuende Colleagues, who developed the V-2 rocket for the German military during the War, to the United Sttes under a contract to the U.S. Army Corps as part of Operation Paperclip. During the following five years the team worked on high altitude firings of the captured V-2 rockets at the White Sands Missile Range in New Mexico, and a guided missile development unit at Fort Bliss, Texas. In April 1950, the group was transferred to the Army Ballistic Missile Agency (ABMA) at Redstone Arsenal in Huntsville, Alabama, and continued to work on the development of the guided missiles for the U.S. Army until transferring to a newly established field center of the National Aeronautic and Space Administration (NASA), George C. Marshall Space Flight Center (MSFC).

  17. Fort Collins Science Center-Fiscal year 2009 science accomplishments

    Science.gov (United States)

    Wilson, Juliette T.

    2010-01-01

    Public land and natural resource managers in the United States are confronted with increasingly complex decisions that have important ramifications for both ecological and human systems. The scientists and technical professionals at the U.S. Geological Survey Fort Collins Science Center?many of whom are at the forefront of their fields?possess a unique blend of ecological, socioeconomic, and technological expertise. Because of this diverse talent, Fort Collins Science Center staff are able to apply a systems approach to investigating complicated ecological problems in a way that helps answer critical management questions. In addition, the Fort Collins Science Center has a long record of working closely with the academic community through cooperative agreements and other collaborations. The Fort Collins Science Center is deeply engaged with other U.S. Geological Survey science centers and partners throughout the Department of the Interior. As a regular practice, we incorporate the expertise of these partners in providing a full complement of ?the right people? to effectively tackle the multifaceted research problems of today's resource-management world. In Fiscal Year 2009, the Fort Collins Science Center's scientific and technical professionals continued research vital to Department of the Interior's science and management needs. Fort Collins Science Center work also supported the science needs of other Federal and State agencies as well as non-government organizations. Specifically, Fort Collins Science Center research and technical assistance focused on client and partner needs and goals in the areas of biological information management and delivery, enterprise information, fisheries and aquatic systems, invasive species, status and trends of biological resources (including human dimensions), terrestrial ecosystems, and wildlife resources. In the process, Fort Collins Science Center science addressed natural-science information needs identified in the U

  18. Fortæller

    DEFF Research Database (Denmark)

    Larsen, Gorm

    2012-01-01

    Siden Gerard Genettes ”Discours du récit” (1972) er distinktionen mellem hvem, der taler, og hvem, der ser, blevet cementeret som et grundparadigme i narratologien og litteraturteorien. Genettes pointe var, at den etablerede narrative teori – som fx Wayne C. Booths The Rhetoric of Fiction (1961...... narratologi blevet forsøgt udfordret, enten fordi det hævdes, at en tekst ikke nødvendigvis er udstyret med en fortæller, eller fordi begrebet om fortæller antages at bero på en misvisende og reduktiv antropomorficering. Eller omvendt fordi der i Genettes begrebsdannelse ligger en forkastelse af...... forestillingen om en implicit forfatter (implied author) og dermed også en afvisning af en upålidelige fortæller. Kapitlet præsenterer begreberne fortæller og synsvinkel i narratologien med afsæt i Genettes bestemmelser og diskutere de problemer, der opstår i kølvandet herpå. Det være sig både de rent...

  19. Liquid radwaste processing history at Fort Calhoun Nuclear Station

    International Nuclear Information System (INIS)

    Bilau, A.; Rutar, F.

    1989-01-01

    This report presents a historical perspective of liquid radwaste processing at the Fort Calhoun Unit 1 Nuclear Power Station, located in east central Nebraska. Of particular interest is the textual and graphical comparison of the operational implications of the various waste processing methods employed in the last ten years at the Fort Calhoun Station. Fort Calhoun's waste collection and processing systems are described in detail. These process systems include evaporation and solidification employing an in-plant drum solidification system. This solidification system was later replaced with vendor solidification services which solidified wastes in large liners. Ultimately, the plant converted its processing operation to ion exchange cleanup using ion selective media. The operational and economic impact of each of these process systems is discussed including overall costs, personnel exposure, capital expenditure requirements, burial volumes generated, maintenance and reliability assessments. Operational goals and performance criteria employed in the decision-making process for selection of the optimal technology are discussed, including the impact of various influent and effluent requirements

  20. Fort St. Vrain circulator operating experience

    International Nuclear Information System (INIS)

    Brey, H.L.

    1988-01-01

    Fort St. Vrain, on the system of Public Service Company of Colorado, is the only high-temperature gas-cooled power reactor in the United States. Four helium circulators are utilized in this plant to transfer heat from the reactor to the steam generators. These unique machines have a single stage axial flow helium compressor driven by a single stage steam turbine. A single stage water driven (pelton wheel) turbine is the back-up drive utilizing either feed water, condensate, or fire water as the driving fluid. Developmental testing of the circulators was accomplished prior to installation into Fort St. Vrain. A combined machine operating history of approximately 250,000 hours has shown these machines to be of conservative design and proven mechanical integrity. However, many problems have been encountered in operating the complex auxiliaries which are necessary for successful circulator and plant operation. It has been 15 years since initial installation of the circulators occurred at Fort St. Vrain. During this time, a number of significant issues had to be resolved dealing specifically with machine performance. These events include cavitation damage of the pelton wheels during the initial plant hot functional testing, cracks in the water turbine buckets and cervic coupling, static shutdown seal bellows failure, and, most recently, degradation of components within the steam drive assembly. Unreliable operation particularly with the circulator auxiliaries has been a focus of attention by Public Service Company of Colorado. Actions to replace or significantly modify the existing circulators and their auxiliaries are currently awaiting decisions concerning the long-term future of the Fort St. Vrain plant. (author). 10 refs, 7 figs, 2 tabs

  1. Fort St. Vrain circulator operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Brey, H. L.

    1988-08-15

    Fort St. Vrain, on the system of Public Service Company of Colorado, is the only high-temperature gas-cooled power reactor in the United States. Four helium circulators are utilized in this plant to transfer heat from the reactor to the steam generators. These unique machines have a single stage axial flow helium compressor driven by a single stage steam turbine. A single stage water driven (pelton wheel) turbine is the back-up drive utilizing either feed water, condensate, or fire water as the driving fluid. Developmental testing of the circulators was accomplished prior to installation into Fort St. Vrain. A combined machine operating history of approximately 250,000 hours has shown these machines to be of conservative design and proven mechanical integrity. However, many problems have been encountered in operating the complex auxiliaries which are necessary for successful circulator and plant operation. It has been 15 years since initial installation of the circulators occurred at Fort St. Vrain. During this time, a number of significant issues had to be resolved dealing specifically with machine performance. These events include cavitation damage of the pelton wheels during the initial plant hot functional testing, cracks in the water turbine buckets and cervic coupling, static shutdown seal bellows failure, and, most recently, degradation of components within the steam drive assembly. Unreliable operation particularly with the circulator auxiliaries has been a focus of attention by Public Service Company of Colorado. Actions to replace or significantly modify the existing circulators and their auxiliaries are currently awaiting decisions concerning the long-term future of the Fort St. Vrain plant. (author). 10 refs, 7 figs, 2 tabs.

  2. Airborne gamma-ray spectrometer and magnetometer survey: Forsyth quadrangle, Round Up quadrangle, Hardin quadrangle (Montana), Sheridan quadrangle, (Wyoming). Final report

    International Nuclear Information System (INIS)

    1981-01-01

    An airborne combined radiometric and magnetic survey was performed for the Department of Energy (DOE) over the area covered by the Forsyth, Hardin, and Sheridan, and Roundup, 1:250,000 National Topographic Map Series (NTMS), quadrangle maps. The survey was part of DOE's National Uranium Resource Evaluation (NURE) program. Data were collected by a helicopter equipped with a gamma-ray spectrometer with a large crystal volume, and with a high sensitivity proton precession magnetometer. The radiometric system was calibrated at the Walker Field Calibration Pads and the Lake Mead Dynamic Test Range. Data quality was ensured during the survey by daily test flights and equipment checks. Radiometric data were corrected for live time, aircraft and equipment background, cosmic background, atmospheric radon, Compton scatter, and altitude dependence. The corrected data were statistically evaluated, plotted, and contoured to produce anomaly maps based on the radiometric response of individual geological units. The anomalies were interpreted and an interpretation map produced. Volume I contains a description of the systems used in the survey, a discussion of the calibration of the systems, the data collection procedures, the data processing procedures, the data presentation, the interpretation rationale, and the interpretation methodology. A separate Volume II for each quadrangle contains the data displays and the interpretation results

  3. Archeological Testing at Fort St. Leon (16PL35), Plaquemines Parish, Louisiana.

    Science.gov (United States)

    1983-05-01

    Bend which is nebulous at best. 3. Test excavations downriver from the American fort (BHT 12, 13, 14, 15) (Figure 24b) encountered disturbed strata...unidentifiable 3 Unit 1, 2.07-1.82 m Plastron fragments (pond slider turtle ) 3 Unit 1, 2.02-1.82 m Plastron and carapace fragments (pond slider turtle ) 2 Unit...trench walls less than 1 m below the surface. The same is true for the pond slider turtle bones from Units 1 and 2. 160 . . . .. . . . . . . o Nutria

  4. Aerial gamma ray and magnetic survey: Powder River R and D Project. Portions of the: Forsyth and Hardin, Montana, and the Sheridan, Arminto, Newcastle, and Gillette, Wyoming Quadrangles. Final report

    International Nuclear Information System (INIS)

    1979-05-01

    During the months of August through September, 1978, geoMetrics, Inc. flew approximately 1520 line miles of high sensitivity airborne radiometric and magnetic data in Wyoming and southern Montana within four 1 0 x 2 0 NTMS quadrangles (Arminto, Sheridan, Hardin and Forsyth), and 1390 lines miles in the detail area in eastern Wyoming, as part of the Department of Energy's National Uranium Resource Evaluation program. All radiometric and magnetic data were fully reduced and interpreted by geoMetrics, and are presented as three volumes (one Volume I and two Volume II's) in this report. The survey area lies largely within the northern Great Plains Physiographic Province. The deep Powder River Basin is the dominant structure in the area. Portions of the Casper Arch, Big Horn Uplift, and Porcupine Dome fall within the western limits of the area. The Basin is one of the largest and deepest in the northern Great Plains and contains over 17,000 feet of Phanerozoic sediments at its deepest point. Economic deposits of oil, coal, bentonite and uranium are found in the Tertiary and/or Cretaceous rocks of the Basin. Epigenetic uranium deposits lie primarily in the Pumpkin Buttes - Turnercrest districts within arkosic sandstones of the Paleocene Fort Union Formation. A total of 62 groups of statistical values for the R and D area and 127 for the Arminto Detail in the uranium window meet the criteria for valid anomalies and are discussed in their respective interpretation sections. Most anomalies lie in the Tertiary sediments of the Powder River Basin. Some of the anomalies in the Arminto Detail are clearly related to mines or prospects

  5. Defense.gov Special Report: Fort Hood Shooting

    Science.gov (United States)

    identify possible insider threats, Army Secretary John M. McHugh told lawmakers. Story Obama: Soldiers ," Army Secretary John M. McHugh told lawmakers. Story President Praises Swift Response to Fort Hood Remarks on Fort Hood Shooting at White House McHugh, Odierno Address Fort Hood Shooting Before Congress

  6. The WIMS-E module W-FORTE

    International Nuclear Information System (INIS)

    Roth, M.J.

    1983-09-01

    There are three distinct versions of the WIMS lattice cell program. WIMS-E is the most general, WIMSD4 is restricted to clusters or to one dimensional slab or annular geometry, and LWRWIMS is designed principally for light water reactor geometries. W-FORTE is used to transfer data from WIMSD4 or LWRWIMS to WIMS-E. A description of the W-FORTE module is given, and includes the relevant data for WIMSD4, LWRWIMS and W-FORTE. (UK)

  7. Renewable Energy Opportunities at Fort Hood, Texas

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E.; Warwick, William M.; Orrell, Alice C.; Russo, Bryan J.; Parker, Kyle R.; Weimar, Mark R.; Horner, Jacob A.; Manning, Anathea

    2011-11-14

    This report presents the results of Pacific Northwest National Laboratory's (PNNL) follow-on renewable energy (RE) assessment of Fort Hood. Fort Hood receives many solicitations from renewable energy vendors who are interested in doing projects on site. Based on specific requests from Fort Hood staff so they can better understand these proposals, and the results of PNNL's 2008 RE assessment of Fort Hood, the following resources were examined in this assessment: (1) Municipal solid waste (MSW) for waste-to-energy (WTE); (2) Wind; (3) Landfill gas; (4) Solar photovoltaics (PV); and (5) Shale gas. This report also examines the regulatory issues, development options, and environmental impacts for the promising RE resources, and includes a review of the RE market in Texas.

  8. Revised Geologic Map of the Fort Garland Quadrangle, Costilla County, Colorado

    Science.gov (United States)

    Wallace, Alan R.; Machette, Michael N.

    2008-01-01

    The map area includes Fort Garland, Colo., and the surrounding area, which is primarily rural. Fort Garland was established in 1858 to protect settlers in the San Luis Valley, then part of the Territory of New Mexico. East of the town are the Garland mesas (basalt-covered tablelands), which are uplifted as horsts with the Central Sangre de Cristo fault zone. The map also includes the northern part of the Culebra graben, a deep structural basin that extends from south of San Luis (as the Sanchez graben) to near Blanca, about 8 km west of Fort Garland. The oldest rocks exposed in the map area are early Proterozic basement rocks (granites in Ikes Creek block) that occupy an intermediate structural position between the strongly uplifted Blanca Peak block and the Culebra graben. The basement rocks are overlain by Oligocene volcanic and volcaniclastic rocks of unknown origin. The volcanic rocks were buried by a thick sequence of basin-fill deposits of the Santa Fe Group as the Rio Grande rift formed about 25 million years ago. The Servilleta Basalt, a regional series of 3.7?4.8 Ma old flood basalts, was deposited within sediment, and locally provides a basis for dividing the group into upper and lower parts. Landslide deposits and colluvium that rest on sediments of the Santa Fe Group cover the steep margins of the mesas. Exposures of the sediment beneath the basalt and within the low foothills east of the Central Sangre de Cristo fault zone are comprised of siltstones, sandstones, and minor fluvial conglomerates. Most of the low ground surrounding the mesas and in the graben is covered by surficial deposits of Quaternary age. The alluvial deposits are subdivided into three Pleistocene-age units and three Holocene-age units. The oldest Pleistocene gravel (unit Qao) is preserved as isolated remnants that cap high surfaces north and east of Fort Garland. The primary geologic hazards in the map area are from earthquakes, landslides, and localized flooding. The Central

  9. Military vehicle trafficking impacts vegetation and soil bulk density at Fort Benning, Georgia

    Science.gov (United States)

    Potential increases in wind erosion that might be brought about by military vehicles travelling off-road during training are of concern to the United States military. Field studies were conducted in the summer of 2012 at Fort Benning, Georgia. The objective of the experiment was to assess the traffi...

  10. FOUR YEARS OF OPERATIONS AND RESULTS WITH FORTE

    International Nuclear Information System (INIS)

    D. ROUSSEL-DUPRE; P. KLINGNER; L. CARLSON; ET AL

    2001-01-01

    The FORTE (Fast Onboard Recording of Transient Events) satellite was launched on 29 August 1997 and has been in continuous operation since that time. FORTE was placed in a nearly circular, 825-km-altitude, 70 degrees inclination orbit by a Pegasus rocket funded by Air Force Space Test Program. The Department of Energy funded the FORTE satellite, which was designed and built at Los Alamos. FORTE's successful launch and engineered robustness were a result of several years of dedicated work by the joint Los Alamos National Laboratory/Sandia National Laboratory project team, led through mission definition, payload and satellite development, and launch by Dr. Stephen Knox. The project is now led by Dr. Abram Jacobson. FORTE carries a suite of instruments, an optical system and a rf system, for the study of lightning and anthropogenic signals. As a result of this effort, new understandings of lightning events have emerged as well as a more complete understanding of the relationship between optical and rf lightning events. This paper will provide an overview of the FORTE satellite and will discuss the on orbit performance of the subsystems

  11. Bioequivalence of fixed-dose combination Myrin®-P Forte and reference drugs in loose combination.

    Science.gov (United States)

    Wang, H F; Wang, R; O'Gorman, M; Crownover, P; Naqvi, A; Jafri, I

    2013-12-01

    Myrin®-P Forte is a fixed-dose combination (FDC) tablet containing rifampicin (RMP, 150 mg), isoniazid (INH, 75 mg), ethambutol (EMB) hydrochloride (275 mg) and pyrazinamide (PZA, 400 mg) developed for the treatment of tuberculosis (TB). This study was conducted at a single centre--the Pfizer Clinical Research Unit in Singapore. To demonstrate the bioequivalence of each drug component of the Myrin-P Forte FDC and the individual product in loose combination. In a randomized, open-label, single-dose, two-way, crossover study, subjects received single doses of Myrin-P Forte or four individual products under fasting conditions in a crossover fashion with at least 7 days washout between doses. The primary measures for comparison were peak plasma concentration (C(max)) and the area under plasma concentration-time curve (AUC). Of 36 subjects enrolled, 35 completed the study. The adjusted geometric mean ratios and 90% confidence intervals for C(max) and AUC values were completely contained within bioequivalence limits (80%, 125%) for all four drugs in both formulations. Both treatments were generally well tolerated in the study. The Myrin-P Forte FDC tablet formulation is bioequivalent to the four single-drug references for RMP, INH, EMB hydrochloride and PZA at equivalent doses.

  12. Bent's Old Fort: Amphibians and Reptiles

    Science.gov (United States)

    Muths, E.

    2008-01-01

    Bent's Old Fort National Historic Site sits along the Arkansas River in the semi-desert prairie of southeastern Colorado. The USGS provided assistance in designing surveys to assess the variety of herpetofauna (amphibians and reptiles) resident at this site. This brochure is the results of those efforts and provides visitors with information on what frogs, toads, snakes and salamanders might be seen and heard at Bent's Old Fort.

  13. Vegetation inventory, mapping, and classification report, Fort Bowie National Historic Site

    Science.gov (United States)

    Studd, Sarah; Fallon, Elizabeth; Crumbacher, Laura; Drake, Sam; Villarreal, Miguel

    2013-01-01

    A vegetation mapping and characterization effort was conducted at Fort Bowie National Historic Site in 2008-10 by the Sonoran Desert Network office in collaboration with researchers from the Office of Arid lands studies, Remote Sensing Center at the University of Arizona. This vegetation mapping effort was completed under the National Park Service Vegetation Inventory program which aims to complete baseline mapping inventories at over 270 national park units. The vegetation map data was collected to provide park managers with a digital map product that met national standards of spatial and thematic accuracy, while also placing the vegetation into a regional and even national context. Work comprised of three major field phases 1) concurrent field-based classification data collection and mapping (map unit delineation), 2) development of vegetation community types at the National Vegetation Classification alliance or association level and 3) map accuracy assessment. Phase 1 was completed in late 2008 and early 2009. Community type descriptions were drafted to meet the then-current hierarchy (version 1) of the National Vegetation Classification System (NVCS) and these were applied to each of the mapped areas. This classification was developed from both plot level data and censused polygon data (map units) as this project was conducted as a concurrent mapping and classification effort. The third stage of accuracy assessment completed in the fall of 2010 consisted of a complete census of each map unit and was conducted almost entirely by park staff. Following accuracy assessment the map was amended where needed and final products were developed including this report, a digital map and full vegetation descriptions. Fort Bowie National Historic Site covers only 1000 acres yet has a relatively complex landscape, topography and geology. A total of 16 distinct communities were described and mapped at Fort Bowie NHS. These ranged from lush riparian woodlands lining the

  14. ALARA and decommissioning: The Fort St. Vrain experience

    Energy Technology Data Exchange (ETDEWEB)

    Borst, T.; Niehoff, M. [Public Service Co. of Colorado, Platteville, CO (United States); Zachary, M. [Scientific Ecology Group, Platteville, CO (United States)

    1995-03-01

    The Fort St. Vrain Nuclear Generating Station, the first and only commercial High Temperature Gas Cooled Reactor to operate in the United States, completed initial fuel loading in late 1973 and initial startup in early 1974. Due to a series of non-nuclear technical problems, Fort St. Vrain never operated consistently, attaining a lifetime capacity factor of slightly less than 15%. In August of 1989, the decision was made to permanently shut down the plant due to control rod drive and steam generator ring header failures. Public Service Company of Colorado elected to proceed with early dismantlement (DECON) as opposed to SAFSTOR on the bases of perceived societal benefits, rad waste, and exposure considerations, regulatory uncertainties associated with SAFSTOR, and cost. The decommissioning of Fort St. Vrain began in August of 1992, and is scheduled to be completed in early 1996. Decommissioning is being conducted by a team consisting of Westinghouse, MK-Ferguson, and Scientific Ecology Group. Public Service Company of Colorado as the licensee provides contract management and oversight of contractor functions. An aggressive program to maintain project radiation exposures As Low As Reasonably Achievable (ALARA) has been established, with the following program elements: temporary and permanent shielding contamination control; mockup training; engineering controls; worker awareness; integrated work package reviews communication; special instrumentation; video camera usage; robotics application; and project committees. To date, worker exposures have been less than project estimates. from the start of the project through Februrary of 1994, total exposure has been 98.666 person-rem, compared to the project estimate of 433 person-rem and goal of 347 person-rem. The presentation will discuss the site characterization efforts, the radiological performance indicator program, and the final site release survey plans.

  15. Fort Collins Science Center fiscal year 2010 science accomplishments

    Science.gov (United States)

    Wilson, Juliette T.

    2011-01-01

    The scientists and technical professionals at the U.S. Geological Survey (USGS), Fort Collins Science Center (FORT), apply their diverse ecological, socioeconomic, and technological expertise to investigate complicated ecological problems confronting managers of the Nation's biological resources. FORT works closely with U.S. Department of the Interior (DOI) agency scientists, the academic community, other USGS science centers, and many other partners to provide critical information needed to help answer complex natural-resource management questions. In Fiscal Year 2010 (FY10), FORT's scientific and technical professionals conducted ongoing, expanded, and new research vital to the science needs and management goals of DOI, other Federal and State agencies, and nongovernmental organizations in the areas of aquatic systems and fisheries, climate change, data and information integration and management, invasive species, science support, security and technology, status and trends of biological resources (including the socioeconomic aspects), terrestrial and freshwater ecosystems, and wildlife resources, including threatened and endangered species. This report presents selected FORT science accomplishments for FY10 by the specific USGS mission area or science program with which each task is most closely associated, though there is considerable overlap. The report also includes all FORT publications and other products published in FY10, as well as staff accomplishments, appointments, committee assignments, and invited presentations.

  16. NSU Art Museum Fort Lauderdale | Art Museum in Fort Lauderdale

    Science.gov (United States)

    NSU Art Museum Fort Lauderdale Visit Admissions Hours & Admission Policies & Accessibility Airports Shop & Dine About the Café & Store Store Café Menu Art Exhibitions Currently on View Thursday 2-for-1 specials on wine and craft beer in the Museum Café, and hands-on art projects for all

  17. Fortælling og fortolkning i Jyske Bank

    DEFF Research Database (Denmark)

    Albrechtsen, Charlotte

    Afhandlingen præsenterer en undersøgelse af et konkret eksempel på storytelling brugt som strategisk ledelses- og kommunikationsredskab i en organisations interne kommunikation. Eksemplet er fortællingen "Slaget ved Vejle", som stammer fra Jyske Bank og udgør under afhandlingens case. De overordn......Afhandlingen præsenterer en undersøgelse af et konkret eksempel på storytelling brugt som strategisk ledelses- og kommunikationsredskab i en organisations interne kommunikation. Eksemplet er fortællingen "Slaget ved Vejle", som stammer fra Jyske Bank og udgør under afhandlingens case. De......, at medarbejderne forholder sig reflekteret, nuanceret og kritisk til den strategiske fortælling, og at der er stor diversitet i deres oplevelser, fortolkninger og vurderinger af fortællingen. Desuden ser afhandlingen nærmere på hvad begrebet "storytelling" dækker over, og hvordan der hidtil er forsket i...

  18. Third party testing : new pilot facility for mining processes opens in Fort McKay

    International Nuclear Information System (INIS)

    Jaremko, D.

    2007-01-01

    Fort McKay lies 65 kilometres north of Fort McMurray, Alberta and is the centre of operational oilsands mining activity. As such, it was chosen for a pilot testing facility created by the Geneva-based SGS Group. The reputable facility provides an opportunity for mining producers to advance their processes, including environmental performance, by allowing them to test different processes on their own oilsands. The Northern Lights partnership, led by Synenco Energy, was the first client at the facility. Due to outsourcing, clients are not obligated to make substantial capital investment into in-house research. The Northern Lights partnership will be using the facility to test extraction processes on bitumen from its leases. Although the Fort McKay facility is SGS's first venture into the oilsands industry, it operates in more than 140 companies globally, including the mineral industry, and specializes in inspection, verification, testing and certification. SGS took the experience from its minerals extraction business to identify what could be done to help the oilsands industry by using best practices developed from global operations. The facility lies on the Fort McKay industrial park owned by the Fort McKay First Nation. An existing testing facility called McMurray Resources Research and Testing was expanded by the SGS Group to include environmental analysis capabilities. The modular units that lie on 6 acres include refrigerated ore storage to maintain ore integrity; modular ore and materials handling systems; extraction equipment; and, zero discharge process water and waste disposal systems. Froth treatment will be added in the near future to cover the entire upstream side of the mining processing business. A micro-upgrader might be added in the future to manufacture synthetic crude. 3 figs

  19. Third party testing : new pilot facility for mining processes opens in Fort McKay

    Energy Technology Data Exchange (ETDEWEB)

    Jaremko, D.

    2007-12-15

    Fort McKay lies 65 kilometres north of Fort McMurray, Alberta and is the centre of operational oilsands mining activity. As such, it was chosen for a pilot testing facility created by the Geneva-based SGS Group. The reputable facility provides an opportunity for mining producers to advance their processes, including environmental performance, by allowing them to test different processes on their own oilsands. The Northern Lights partnership, led by Synenco Energy, was the first client at the facility. Due to outsourcing, clients are not obligated to make substantial capital investment into in-house research. The Northern Lights partnership will be using the facility to test extraction processes on bitumen from its leases. Although the Fort McKay facility is SGS's first venture into the oilsands industry, it operates in more than 140 companies globally, including the mineral industry, and specializes in inspection, verification, testing and certification. SGS took the experience from its minerals extraction business to identify what could be done to help the oilsands industry by using best practices developed from global operations. The facility lies on the Fort McKay industrial park owned by the Fort McKay First Nation. An existing testing facility called McMurray Resources Research and Testing was expanded by the SGS Group to include environmental analysis capabilities. The modular units that lie on 6 acres include refrigerated ore storage to maintain ore integrity; modular ore and materials handling systems; extraction equipment; and, zero discharge process water and waste disposal systems. Froth treatment will be added in the near future to cover the entire upstream side of the mining processing business. A micro-upgrader might be added in the future to manufacture synthetic crude. 3 figs.

  20. Undervisning mellem fortælling og feedback

    DEFF Research Database (Denmark)

    Andersen, Kirsten Margrethe

    2016-01-01

    Feedback gør det muligt for den enkelte at forstå, hvordan jeg kan blive bedre til det, jeg er ved at lære. Fortællinger gør det muligt for den enkelte at udvide horisonten og derved komme til en forståelse af, hvilke mulige perspektiver der er for at forholde sig til den verden, som fortællingen...

  1. Structural remains at the early mediaeval fort at Raibania, Orissa

    Directory of Open Access Journals (Sweden)

    Bratati Sen

    2013-11-01

    Full Text Available The fortifications of mediaeval India occupy an eminent position in the history of military architecture. The present paper deals with the preliminary study of the structural remains at the early mediaeval fort at Raibania in the district of Balasore in Orissa. The fort was built of stone very loosely kept together. The three-walled fortification interspersed by two consecutive moats, a feature evidenced at Raibania, which is unparallel in the history of ancient and mediaeval forts and fortifications in India. Several other structures like the Jay-Chandi Temple Complex, a huge well, numerous tanks and remains of an ancient bridge add to the uniqueness of the Fort in the entire eastern region.

  2. Le Fort I Maxillary Advancement Using Distraction Osteogenesis

    Science.gov (United States)

    Combs, Patrick D.; Harshbarger, Raymond J.

    2014-01-01

    Treatment of maxillary hypoplasia has traditionally involved conventional Le Fort I osteotomies and advancement. Advancements of greater than 10 mm risk significant relapse. This risk is greater in the cleft lip and palate population, whose anatomy and soft tissue scarring from prior procedures contributes to instability of conventional maxillary advancement. Le Fort I advancement with distraction osteogenesis has emerged as viable, stable treatment modality correction of severe maxillary hypoplasia in cleft, syndromic, and noncleft patients. In this article, the authors provide a review of current data and recommendations concerning Le Fort I advancement with distraction osteogenesis. In addition, they outline their technique for treating severe maxillary hypoplasia with distraction osteogenesis using internal devices. PMID:25383054

  3. Case Study: Fort Mill High School--A Culture of Continuous Improvement

    Science.gov (United States)

    Southern Regional Education Board (SREB), 2014

    2014-01-01

    This is the latest in a series of case studies highlighting best practices High Schools That Work (HSTW) network schools and districts are implementing to prepare students better for further studies and careers. Fort Mill High School is in Fort Mill, South Carolina, an outlying suburb of Charlotte, North Carolina. Fort Mill links high quality…

  4. Hydrologic Analysis of Fort Leonard Wood, Missouri

    Science.gov (United States)

    2015-08-01

    drainage areas are different, hydrological analysis will be conducted on the two basins individually. The results of the two analyses will be combined to...ER D C TR -1 5- 4 Environmental Quality and Installations Hydrologic Analysis of Fort Leonard Wood, Missouri En gi ne er R es ea rc h...Environmental Quality and Installations ERDC TR-15-4 August 2015 Hydrologic Analysis of Fort Leonard Wood, Missouri Michael L. Follum, Darla C. McVan

  5. Fortællerfiktionen

    DEFF Research Database (Denmark)

    Reitan, Rolf

    Bogen er en kritisk nærlæsning af Gérard Genettes Discours du récit og viser, hvorden den franske teoretiker løser og forenkler en række centrale problemer i traditionel fortælleteori, idet han uudtalt forudsætter et fiktionsbegreb, som han eksplicit afviser som narratologisk relevant. Det...

  6. Fort Valley's early scientists: A legacy of distinction

    Science.gov (United States)

    Andrew J. Sanchez Meador; Susan D. Olberding

    2008-01-01

    When the Riordan brothers of Flagstaff, Arizona, asked Gifford Pinchot to determine why there was a deficit in ponderosa pine seedlings, neither party understood the historical significance of what they were setting in motion for the field of forest research. The direct result of that professional favor was the establishment of the Fort Valley Experiment Station (Fort...

  7. Neutron flux distribution measurement in the Fort St. Vrain initial core (results of Fort St. Vrain start-up test A-7)

    International Nuclear Information System (INIS)

    Marshall, A.C.; Brown, J.R.

    1975-01-01

    A description is given of a test to measure the axial flux distribution at several radial locations in the Fort St. Vrain core representing unrodded, rodded, and partially rodded regions. The measurements were intended to verify the calculational accuracy of the three-dimensional calculational model used to compute axial power distributions for the Fort St. Vrain core. (U.S.)

  8. Anatomy of the Le Fort I segment: Are arterial variations a potential risk factor for avascular bone necrosis in Le Fort I osteotomies?

    Science.gov (United States)

    Bruneder, Simon; Wallner, Jürgen; Weiglein, Andreas; Kmečová, Ĺudmila; Egger, Jan; Pilsl, Ulrike; Zemann, Wolfgang

    2018-05-02

    Osteotomies of the Le Fort I segment are routine operations with low complication rates. Ischemic complications are rare, but can have severe consequences that may lead to avascular bone necrosis of the Le Fort I segment. Therefore the aim of this study was to investigate the blood supply and special arterial variants of the Le Fort I segment responsible for arterial hypoperfusion or ischemic avascular necrosis after surgery. The arterial anatomy of the Le Fort I segment's blood supply using 30 halved human cadaver head specimens was analyzed after complete dissection until the submicroscopic level. In all specimens the arterial variants of the Le Fort I segment and also the arterial diameters measured at two points were evaluated. The typical known vascularization pattern was apparent in 90% of all specimens, in which the ascending palatine (D1: 1,2 mm ± 0,34 mm; D2: 0,8 mm ± 0,34 mm) and ascending pharyngeal artery (D1: 1,3 mm ± 0,58 mm; D2: avascular segment necrosis after surgery. An individualized operation plan may prevent ischemic complications in at-risk patients. Copyright © 2018 European Association for Cranio-Maxillo-Facial Surgery. Published by Elsevier Ltd. All rights reserved.

  9. 78 FR 17087 - Special Local Regulation; New River Raft Race, New River; Fort Lauderdale, FL

    Science.gov (United States)

    2013-03-20

    ...-AA08 Special Local Regulation; New River Raft Race, New River; Fort Lauderdale, FL AGENCY: Coast Guard... on the New River in Fort Lauderdale, Florida during the Rotary Club of Fort Lauderdale New River Raft... States during the Rotary Club of Fort Lauderdale New River Raft Race. On March 23, 2013, Fort Lauderdale...

  10. Les Fiançailles au couvent : Prokofiev adapte La Duègne de Sheridan Prokofiev’s Betrothal in a Monastery: adapting Sheridan’s Duenna

    Directory of Open Access Journals (Sweden)

    Tetiana Zolozova

    2011-12-01

    Full Text Available La rencontre de Prokofiev avec le patrimoine littéraire anglophone a sensiblement marqué son œuvre dans le domaine du ballet (Roméo et Juliette de Shakespeare et de l’opéra (La Duègne ou les Fiançailles au couvent de Sheridan. Ecrites presque en même temps, ces œuvres témoignent de l’intérêt du compositeur, voire de sa fascination pour un patrimoine culturel différent, inexploité par lui auparavant pour ses œuvres opératiques, fondées jusque-là sur les livrets inspirés d’écrivains russes et italiens. L’opéra présente un intérêt particulier du fait que la pièce de Sheridan est écrite dès son origine comme un livret d’opéra et fut mise en musique dès sa création et Prokofiev y vit tout de suite de quoi faire un opéra à la Mozart ou Rossini. Quelles sont les intentions personnelles du compositeur et quelles causes politico-sociales en URSS ont poussé Prokofiev vers ce sujet ? De quelle façon son interprétation de la pièce, qui s’inscrit dans la renaissance des traditions de l’opera buffa, répond-elle à l’original de Sheridan ? Quel éclairage nouveau le compositeur a-t-il apporté dans son adaptation de la pièce ? Comment, tant dans son livret que dans la musique, Prokofiev a-t-il utilisé les possibilités fournies par le texte-source pour construire la dramaturgie de l’opéra de façon à mettre en relief l’élément lyrique et le mélodisme opératique qui lui est particulier ?Prokofiev’s musical production is heavily indebted to his encounter with Britain’s literary heritage, with such important works as his ballet Romeo and Juliet after Shakespeare and his four-act opera buffa Betrothal in a Monastery after Richard Brinsley Sheridan’s The Duenna or The Double Elopement. Written almost at the same time, the two works indicate the composer’s fascination for a different cultural heritage, so far unexploited in his operas inspired by the works of Russian or Italian writers

  11. 40 CFR 81.63 - Metropolitan Fort Smith Interstate Air Quality Control Region.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Metropolitan Fort Smith Interstate Air... Air Quality Control Regions § 81.63 Metropolitan Fort Smith Interstate Air Quality Control Region. The Metropolitan Fort Smith Interstate Air Quality Control Region (Arkansas-Oklahoma) has been revised to consist...

  12. How Do Le Fort-Type Fractures Present in a Pediatric Cohort?

    Science.gov (United States)

    Macmillan, Alexandra; Lopez, Joseph; Luck, J D; Faateh, Muhammad; Manson, Paul; Dorafshar, Amir H

    2018-05-01

    Le Fort-type fractures are very rare in children, and there is a paucity of literature presenting their frequency and characteristics. The purpose of this study was to determine the etiology, frequency, and fracture patterns of children with severe facial trauma associated with pterygoid plate fractures in a pediatric cohort. We performed a retrospective cohort study of all children aged younger than 16 years with pterygoid plate and facial fractures who presented to our institute between 1990 and 2010. Patient charts and radiologic records were reviewed for demographic and fracture characteristics. Patients were categorized into 2 groups as per facial fracture pattern: non-Le Fort-type fractures (group A) and Le Fort-type fractures (group B). Other variables including dentition age, frontal sinus development, mechanism of injury, injury severity, and concomitant injuries were recorded. Univariate methods were used to compare groups. We identified 24 children; 25% were girls, and 20.8% were of nonwhite race. Most presented with Le Fort-type fracture patterns (group B, 66.7%). Age was significantly different between group A and group B (mean, 5.9 years and 9.9 years, respectively; P = .009). No significant differences in Injury Severity Score, rate of operative repair, and length of stay were found between groups. Most children with severe facial fractures and pterygoid plate fractures presented with Le Fort-type fracture patterns in our cohort. The mean age of children with Le Fort-type fractures was greater than in those with non-Le Fort-type patterns. However, Le Fort-type fractures did occur in younger children with deciduous and mixed dentition. Copyright © 2017 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  13. Le Fort I Maxillary Advancement Using Distraction Osteogenesis

    OpenAIRE

    Combs, Patrick D.; Harshbarger, Raymond J.

    2014-01-01

    Treatment of maxillary hypoplasia has traditionally involved conventional Le Fort I osteotomies and advancement. Advancements of greater than 10 mm risk significant relapse. This risk is greater in the cleft lip and palate population, whose anatomy and soft tissue scarring from prior procedures contributes to instability of conventional maxillary advancement. Le Fort I advancement with distraction osteogenesis has emerged as viable, stable treatment modality correction of severe maxillary hyp...

  14. An aerial radiological survey of the Fort Calhoun Nuclear Power Plant and surrounding area, Fort Calhoun, Nebraska

    International Nuclear Information System (INIS)

    1994-05-01

    An aerial radiological survey was conducted over the Fort Calhoun Nuclear Power Plant in Fort Calhoun, Nebraska, during the period June 19 through June 28, 1993. The survey was conducted at an altitude of 150 feet (46 meters) over a 25-square-mile (65-square-kilometer) area centered on the power station. The purpose of the survey was to document the terrestrial gamma radiation environment of the Fort Calhoun Nuclear Power Plant and surrounding area. The results of the aerial survey are reported as inferred gamma radiation exposure rates at 1 meter above ground level in the form of a contour map. Outside the plant boundary, exposure rates were found to vary between 6 and 12 microroentgens per hour and were attributed to naturally-occurring uranium, thorium, and potassium. The aerial data were compared to ground-based benchmark exposure rate measurements and radionuclide assays of soil samples obtained within the survey boundary. The ground-based measurements were found to be in good agreement with those inferred from the aerial measuring system. A previous survey was conducted on August 9 and 10, 1972, before the plant began operation. Exposure rates measured in both surveys were consistent with normal terrestrial background

  15. Fort Carson Wind Resource Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Robichaud, R.

    2012-10-01

    This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and economic potential of a wind turbine project on a ridge in the southeastern portion of the Fort Carson Army base.

  16. Renewable Energy Opportunities at Fort Sill, Oklahoma

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, Brian K.; Hand, James R.; Horner, Jacob A.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Nesse, Ronald J.

    2011-03-31

    This document provides an overview of renewable resource potential at Fort Sill, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Sill took place on June 10, 2010.

  17. Renewable Energy Opportunities at Fort Polk, Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Boyd, Brian K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Horner, Jacob A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gorrissen, Willy J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Orrell, Alice C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weimar, Mark R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hand, James R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Russo, Bryan J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Williamson, Jennifer L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2010-11-17

    This document provides an overview of renewable resource potential at Fort Polk, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Polk took place on February 16, 2010.

  18. Fort Independence: An Eighteenth-Century Frontier Homesite and Militia Post in South Carolina.

    Science.gov (United States)

    1982-12-01

    included in this instance as a condiment , but it could also indicate that the Fort Independence garrison was familiar with the strategy employed by the Fort...archeological investigation of Fort Charlotte, McCormick County, South Carolina. Notebook, Institute of Archeology and Anthropology, University of South

  19. Final Report; Arsenic Fate, Transport and Stability Study; Groundwater, Surface Water, Soil And Sediment Investigation, Fort Devens Superfund Site, Devens, Massachusetts

    Science.gov (United States)

    This document presents results from the Fiscal Years 2006-2008 field investigation at the Fort Devens Superfund Site, Operable Unit 1 (Shepley's Hill Landfill) to fulfill the research objectives outlined in the proposal entitled, 'Fate and Transport of Arsenic in an Urban, Milita...

  20. En fascinerende fortælling om det 20. århundredes musik

    DEFF Research Database (Denmark)

    Bonde, Lars Ole

    2011-01-01

    Anmeldelse af Karl Aage Rasmussen: Musik i det tyvende århundrede: En fortælling. Gyldendal 2011.......Anmeldelse af Karl Aage Rasmussen: Musik i det tyvende århundrede: En fortælling. Gyldendal 2011....

  1. Analysis of Delayed Sea Breeze Onset for Fort Ord Prescribed Burning Operations

    Science.gov (United States)

    2015-12-01

    DELAYED SEA BREEZE ONSET FOR FORT ORD PRESCRIBED BURNING OPERATIONS by Dustin D. Hocking December 2015 Thesis Advisor: Wendell Nuss Second...AND DATES COVERED Master’s thesis 4. TITLE AND SUBTITLE ANALYSIS OF DELAYED SEA BREEZE ONSET FOR FORT ORD PRESCRIBED BURNING OPERATIONS 5...release; distribution is unlimited 12b. DISTRIBUTION CODE 13. ABSTRACT (maximum 200 words) The U.S. Army conducts prescribed burns at Fort Ord

  2. Fort Peck-Wolf Point transmission line project, Montana

    International Nuclear Information System (INIS)

    1992-01-01

    The primary objective of the project is to replace the existing 36-mile Fort Peck-Wolf Point transmission line which has reached the end of its useful service life. Presently, the overall condition of this existing section of the 47-year-old line is poor. Frequent repairs have been required because of the absence of overhead ground wires. The continued maintenance of the line will become more expensive and customer interruptions will persist because of the damage due to lightning. The expense of replacing shell rotted poles, and the concern for the safety of the maintenance personnel because of hazards caused by severe shell rot are also of primary importance. The operational and maintenance problems coupled with power system simulation studies, demonstrate the need for improvements to the Wolf Point area to serve area loads. Western's Wolf Point Substation is an important point of interconnection for the power output from the Fort Peck Dam to area loads as far away as Williston, North Dakota. The proposed transmission line replacement would assure that there will continue to be reliable transmission capacity available to serve area electrical loads, as well as provide a reliable second high-voltage transmission path from the Fort Peck generation to back-up a loss of the Fort Peck-Wolf Point 115-kV Line No. 1

  3. Targeting Net Zero Energy at Fort Carson: Assessment and Recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, K.; Markel, T.; Simpson, M.; Leahey, J.; Rockenbaugh, C.; Lisell, L.; Burman, K.; Singer, M.

    2011-10-01

    The U.S. Army's Fort Carson installation was selected to serve as a prototype for net zero energy assessment and planning. NREL performed the comprehensive assessment to appraise the potential of Fort Carson to achieve net zero energy status through energy efficiency, renewable energy, and electric vehicle integration. This report summarizes the results of the assessment and provides energy recommendations. This study is part of a larger cross-laboratory effort that also includes an assessment of renewable opportunities at seven other DoD Front Range installations, a microgrid design for Fort Carson critical loads and an assessment of regulatory and market-based barriers to a regional secure smart grid.

  4. Morphological anomalies in two Lutzomyia (Psathyromyia) shannoni (Diptera: Psychodidae: Phlebotominae) specimens collected from Fort Rucker, Alabama, and Fort Campbell, Kentucky.

    Science.gov (United States)

    Florin, David A; Lawyer, Phillip; Rowton, Edgar; Schultz, George; Wilkerson, Richard; Davies, Stephen J; Lipnick, Robert; Keep, Lisa

    2010-09-01

    This report describes two male specimens of the sand fly species Lutzomyia shannoni (Dyar) (Diptera: Psychodidae: Phlebotominae) collected at Fort Rucker, AL, and Fort Campbell, KY, in dry ice-baited light traps during September 2005. The specimens were observed to have anomalies to the number of spines on the gonostyli. The taxonomic keys of Young and Perkins (Mosq. News 44: 263-285; 1984) use the number of spines on the gonostylus in the first couplet to differentiate two major groupings of North American sand flies. The two anomalous specimens were identified as L. shannoni based on the following criteria: (1) both specimens possess antennal ascoids with long, distinct proximal spurs (a near diagnostic character of L. shannoni in North America), (2) the sequences of the partial cytochrome c oxidase subunit 1 gene from both specimens indicated L. shannoni, and (3) the sequences of the internal transcribed spacer 2 molecular marker from both specimens indicated L. shannoni. The anomalous features are fundamentally different from each other as the Fort Rucker specimen possesses a fifth spine (basally located) on just one gonostylus, whereas the Fort Campbell specimen possesses five spines (extra spines subterminally located) on both gonostyli. Because the gonostyli are part of the external male genitalia, anomalies in the number of spines on the gonostyli may have serious biological consequences, such as reduced reproductive success, for the possessors. These anomalies are of taxonomic interest as the specimens could easily have been misidentified using available morphological keys.

  5. 76 FR 68625 - Establishment of the Fort Monroe National Monument

    Science.gov (United States)

    2011-11-07

    ... period of slavery in the colonies and, later, this Nation. Two hundred and forty-two years later, Fort... 1863. Thus, Old Point Comfort marks both the beginning and end of slavery in our Nation. The Fort... North Beach area lies the only undeveloped shoreline remaining on Old Point Comfort, providing modern...

  6. Inventory of Forts in Indonesia

    Science.gov (United States)

    Rinandi, N.; Suryaningsih, F.

    2015-08-01

    The great archipelago in Indonesia with its wealthy and various nature, the products and commodities of tropic agriculture and the rich soil, was through the centuries a region of interest for other countries all over the world. For several reasons some of these countries came to Indonesia to establish their existence and tried to monopolize the trading. These countries such as the Portuguese, the Spanish, the Dutch and the British built strengthened trade stations which later became forts all over Indonesia to defend their interest. The archipelago of Indonesia possesses a great number of fortification-works as legacies of native rulers and those which were built by European trading companies and later became colonial powers in the 16th to the 19th centuries. These legacies include those specific structures built as a defence system during pre and within the period of World War II. These fortresses are nowadaysvaluable subjects, because they might be considered as shared heritage among these countries and Indonesia. It's important to develop a vision to preserve these particular subjects of heritage, because they are an interesting part of the Indonesian history and its cultural treasures. The Government of the Republic of Indonesia has national program to compile a comprehensive documentation of the existing condition of these various types of forts as cultural heritage. The result of the 3 years project was a comprehensive 442 forts database in Indonesia, which will be very valuable to the implementation of legal protection, preservation matters and adaptive re-use in the future.

  7. Cranial nerve injury after Le Fort I osteotomy.

    Science.gov (United States)

    Kim, J-W; Chin, B-R; Park, H-S; Lee, S-H; Kwon, T-G

    2011-03-01

    A Le Fort I osteotomy is widely used to correct dentofacial deformity because it is a safe and reliable surgical method. Although rare, various complications have been reported in relation to pterygomaxillary separation. Cranial nerve damage is one of the serious complications that can occur after Le Fort I osteotomy. In this report, a 19-year-old man with unilateral cleft lip and palate underwent surgery to correct maxillary hypoplasia, asymmetry and mandibular prognathism. After the Le Fort I maxillary osteotomy, the patient showed multiple cranial nerve damage; an impairment of outward movement of the eye (abducens nerve), decreased vision (optic nerve), and paraesthesia of the frontal and upper cheek area (ophthalmic and maxillary nerve). The damage to the cranial nerve was related to an unexpected sphenoid bone fracture and subsequent trauma in the cavernous sinus during the pterygomaxillary osteotomy. Copyright © 2010 International Association of Oral and Maxillofacial Surgeons. Published by Elsevier Ltd. All rights reserved.

  8. Fort Valley's early scientists: A legacy of distinction (P-53)

    Science.gov (United States)

    Andrew J. Sanchez Meador; Susan D. Olberding

    2008-01-01

    When the Riordan brothers of Flagstaff, Arizona asked Gifford Pinchot to determine why there was a deficit in ponderosa pine seedlings, neither party understood the historical significance of what they were setting in motion for the field of forest research. The direct result of that professional favor was the establishment of the Fort Valley Experiment Station (Fort...

  9. Renewable Energy Opportunities at Fort Campbell, Tennessee/Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    Hand, James R.; Horner, Jacob A.; Kora, Angela R.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Nesse, Ronald J.

    2011-03-31

    This document provides an overview of renewable resource potential at Fort Campbell, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Campbell took place on June 10, 2010.

  10. Renewable Energy Opportunities at Fort Drum, New York

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Scott A.; Orrell, Alice C.; Solana, Amy E.; Williamson, Jennifer L.; Hand, James R.; Russo, Bryan J.; Weimar, Mark R.; Rowley, Steven; Nesse, Ronald J.

    2010-10-20

    This document provides an overview of renewable resource potential at Fort Drum, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Drum took place on May 4 and 5, 2010.

  11. Microgrid Enabled Distributed Energy Solutions (MEDES) Fort Bliss Military Reservation

    Science.gov (United States)

    2014-02-01

    FINAL REPORT Microgrid Enabled Distributed Energy Solutions (MEDES) Fort Bliss Military Reservation ESTCP Project EW-201140 FEBRUARY...TITLE AND SUBTITLE Microgrid Enabled Distributed Energy Solutions (MEDES) 5a. CONTRACT NUMBER W912HQ-11-C-0082 Fort Bliss, Texas...Lockheed Martin’s Intelligent Microgrid Solution can provide more energy security while also lowering electric utility costs and greenhouse gas emissions

  12. Methodology for the evaluation of a 4000-home geothermal heat pump retrofit at Fort Polk, Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, P.J.; Shonder, J.A.; White, D.L.; Huang, H.L.

    1998-03-01

    The US Army and a private energy service company are developing a comprehensive energy efficiency project to upgrade the family housing at Fort Polk, Louisiana. The project includes converting the space conditioning systems of more than 4,000 housing units to geothermal (or ground-source) heat pumps (GHPs). This interim report describes the methodology of the evaluation associated with this project, including the field monitoring that has been conducted at the base.

  13. Structural remains at the early mediaeval fort at Raibania, Orissa

    OpenAIRE

    Sen, Bratati

    2013-01-01

    The fortifications of mediaeval India occupy an eminent position in the history of military architecture. The present paper deals with the preliminary study of the structural remains at the early mediaeval fort at Raibania in the district of Balasore in Orissa. The fort was built of stone very loosely kept together. The three-walled fortification interspersed by two consecutive moats, a feature evidenced at Raibania, w...

  14. Black Swan Event Assessment for Fort Leonard Wood, Missouri

    Science.gov (United States)

    2016-03-01

    ER D C/ CE RL S R- 16 -1 Net Zero Planning for Fort Leonard Wood Black Swan Event Assessment for Fort Leonard Wood, Missouri Co ns...search for other technical reports published by ERDC, visit the ERDC online library at http://acwc.sdp.sirsi.net/client/default. Net Zero Planning for...1.8 degrees Celsius knots 0.5144444 meters per second miles (US statute) 1,609.347 meters miles per hour 0.44704 meters per second ERDC/CERL SR

  15. 75 FR 41922 - Notice of Intent To Rule on Request To Release Airport Property at Fort Smith Regional Airport...

    Science.gov (United States)

    2010-07-19

    ... To Release Airport Property at Fort Smith Regional Airport, Fort Smith, AR AGENCY: Federal Aviation... rule and invites public comment on the release of land at Fort Smith Regional Airport under the.... John Parker, Airport Director, Fort Smith Regional Airport, at the following address: Fort Smith...

  16. Sundhedsprofessionelles begejstring for fortællinger fra levet erfaring

    DEFF Research Database (Denmark)

    Liveng, Anne; Larsen, Christine; Lange, Mads

    2018-01-01

    I 2013 etablerede psykiatrien i Region Hovedstaden, Danmark, et undervisningsprogram om recovery for sundhedsprofessionelle. Evalueringer af programmet viste et udtalt engagement i fortællingen fra underviseren med levet erfaring. Artiklen diskuterer hvordan dette kan forstås. Evalueringsmaterialet...... analyseres ud fra et læringsteoretisk perspektiv og fokuserer på: 1) Betydningen af fortællingens emotionelle indhold, 2) Rolle-bytningen mellem personen med levet erfaring og sundhedsprofessionelle, og 3) Workshoppene som et læringsrum, der aktiverer refleksioner over strukturer og organisering af...

  17. Den tabte fortælling

    DEFF Research Database (Denmark)

    Jørgensen, Kenneth Mølbjerg

    2008-01-01

    Ledelse er et af nøgleordene i fornyelsen af den offentlige sektor. Vi har imidlertid glemt et væsentligt aspekt af ledelse. Dette skyldes ikke mindst, at omgangsformen i dag er reguleret af information, mens den tidligere var reguleret af fortælleevnen. Evnen til dialog, indlevelse og nærvær er...

  18. Seasonal shifts in the diet of the big brown bat (Eptesicus fuscus), Fort Collins, Colorado

    Science.gov (United States)

    Valdez, Ernest W.; O'Shea, Thomas J.

    2014-01-01

    Recent analyses suggest that the big brown bat (Eptesicus fuscus) may be less of a beetle specialist (Coleoptera) in the western United States than previously thought, and that its diet might also vary with temperature. We tested the hypothesis that big brown bats might opportunistically prey on moths by analyzing insect fragments in guano pellets from 30 individual bats (27 females and 3 males) captured while foraging in Fort Collins, Colorado, during May, late July–early August, and late September 2002. We found that bats sampled 17–20 May (n = 12 bats) had a high (81–83%) percentage of volume of lepidopterans in guano, with the remainder (17–19% volume) dipterans and no coleopterans. From 28 May–9 August (n = 17 bats) coleopterans dominated (74–98% volume). On 20 September (n = 1 bat) lepidopterans were 99% of volume in guano. Migratory miller moths (Euxoa auxiliaris) were unusually abundant in Fort Collins in spring and autumn of 2002 and are known agricultural pests as larvae (army cutworms), suggesting that seasonal dietary flexibility in big brown bats has economic benefits.

  19. Rumlige fortællinger fra mobilt og web-baseret GIS

    DEFF Research Database (Denmark)

    Møller-Jensen, Lasse

    2009-01-01

    Denne artikel handler om begrebet rumlige fortællinger med anvendelse af fortællingshenvisninger, og disses potentielle rolle ved implementation af fleksible og tematiske turistinformationssystemer. Artiklen fokuserer på brugen af mobile, positionsbekendte enheder, såsom visse PDA'er og smartphon......, samt på web-gis. Der præsenteres to anvendelseseksempler: et fra det centrale København og et fra et område nær Accra, Ghana....

  20. Fort Mason Center: Pier 2 Project

    Energy Technology Data Exchange (ETDEWEB)

    Nester, Patrick [Fort Mason Center, San Francisco, CA (United States)

    2014-08-30

    The rooftop Photovoltaic (PV) panels and radiant piping project was constructed by Fort Mason Center as part of its $21 million comprehensive rehabilitation of the Pier 2 shed which include the shed’s electrical, natural gas and water systems. Fort Mason Center improved performance while reducing energy and water usage and costs to demonstrate the efficiencies and opportunities available to large multi-function facilities. The scalable demand of these facilities required a layered approach to conservation, control and production. The project employed a comprehensive retrofit of electrical natural gas, and plumbing systems to maximize efficiency and lower carbon footprint specifically to demonstrate the effectiveness of these strategies in a public setting with varied and diverse use. The project was completed in July 2014 and met the expected outcomes regarding increased comfort and operational efficiency throughout the Pier 2 shed as well as on site electrical generation of current consumption. The entire Pier 2 shed project won a 2015 California Preservation Foundation design award for historic rehabilitation.

  1. BRAND EQUITY OF LAHORE FORT AS A TOURISM DESTINATION BRAND

    OpenAIRE

    KASHIF, MUHAMMAD; SAMSI, SITI ZAKIAH MELATU; SARIFUDDIN, SYAMSULANG

    2015-01-01

    ABSTRACTStudies that measure the brand equity of destination brands by using the Customer-Based Brand Equity (CBBE) model in a developing country context are scarce. The present study investigates the destination brand equity of the Lahore Fort by employing the CBBE model in a developing country context of Pakistan. Following the positivist tradition, we adopted a survey-based approach to collect data from 237 tourists visiting the Lahore Fort. Data were collected through a questionnaire deve...

  2. Comprehensive Inventory and Determinations of Eligibility for Fort Riley Buildings: 1857-1963

    Science.gov (United States)

    2009-09-01

    become fashionable . Stone residences built at Fort Riley after the 1850s all have rock-faced walls and most have contrasting smooth-faced lintels...507 is significant as a wood-framed Folk Victorian cottage. While Building 507 is one of four Folk Victorian buildings at Fort Riley, it possesses a

  3. Ecological Baseline, Fort Hood, Texas

    Science.gov (United States)

    1980-08-01

    cedar eTm (Uiimus crassifolia), Texas ash (Fraxinus texansis), and Texas persimmon ( Diospyros texana). Conversely, the two predominant tree species...Ilex decidua), Mex- ican buckeye (Ungnadia spjeciosa), and Texas persimmon ( Diospyros texana). Vines included greenbrier (Smilax bona-nox) and white...Hedgehey Cactus (Echinocereus sp.) has been observed on Fort Hood. Due to the brief period of flowering for this genus , the individual species were not

  4. Fort Davis National Historic Site : acoustical monitoring

    Science.gov (United States)

    2013-06-01

    During the summer of 2010 (September - October 2010), the Volpe Center collected baseline acoustical data at Fort Davis National Historic Site (FODA)at two sites deployed for approximately 30 days each. The baseline data collected during this period ...

  5. Electricity Generation from Geothermal Resources on the Fort Peck Reservation in Northeast Montana

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Garry J. [Gradient Geophysics Inc., Missoula, MT (United States); Birkby, Jeff [Birkby Consulting LLC, Missoula, MT (United States)

    2015-05-12

    Tribal lands owned by Assiniboine and Sioux Tribes on the Fort Peck Indian Reservation, located in Northeastern Montana, overlie large volumes of deep, hot, saline water. Our study area included all the Fort Peck Reservation occupying roughly 1,456 sq miles. The geothermal water present in the Fort Peck Reservation is located in the western part of the Williston Basin in the Madison Group complex ranging in depths of 5500 to 7500 feet. Although no surface hot springs exist on the Reservation, water temperatures within oil wells that intercept these geothermal resources in the Madison Formation range from 150 to 278 degrees F.

  6. Technical evaluation report of the Fort St. Vrain final draft upgraded technical specifications

    International Nuclear Information System (INIS)

    Kimura, C.Y.

    1989-01-01

    This report is a technical evaluation of the final draft of the Fort St. Vrain (FSV) Upgraded Technical Specifications (UT/S) as issued by Public Service of Colorado (PSC) on May 27, 1988 with subsequent supplemental updates issued on June 15, 1988 and August 5, 1988. It has been compared for consistency, and safety conservatism with the Fort St. Vrain (FSV) Updated Final Safety Analysis Report (FSAR), the FSV Safety Evaluation Report (SER), the Facility Operating License, DPR-34, and all amendments to the Facility Operating License issued as of June 1, 1988, and Appendix A to the Operating License DPR-34, Technical Specifications. Because of the age of the plant, no supplements to the Fort St. Vrain SER have been issued since the original SER was not issued as a WASH or a NUREG report. This made it necessary to review all amendments to the Facility Operating License since they would contain the safety evaluations done to support changes to the Facility Operating License. The upgraded Fort St. Vrain Technical Specifications were also broadly compared with the latest Westinghouse Standard Technical Specifications (WSTS) to assure that what was proposed for Fort St. Vrain was consistent with the latest NRC staff practices for standard technical specifications

  7. Fortælleværksteder

    DEFF Research Database (Denmark)

    Krøjer, Jo; Hutters, Camilla

    2009-01-01

    Unges valg af videregående uddannelse er omgærdet af forventninger. Forventninger til hvad man skal vælge. Forventninger til hvor lang tid, man skal være om at tage en uddannelse. Og forventninger til, hvad uddannelsen skal føre til. Artiklen præsenterer fortælleværkstedet, en metode til kollekti...... refleksioner over egne og adres forventninger til og tanker om uddannelsesvalg....

  8. 77 FR 58354 - Bend-Fort Rock Ranger District; Oregon; Withdrawal of Notice for Preparation of an Environmental...

    Science.gov (United States)

    2012-09-20

    ...-Fort Rock Ranger District; Oregon; Withdrawal of Notice for Preparation of an Environmental Impact... Administration, USDOT. ACTION: Notice of withdrawal. SUMMARY: The Bend-Fort Rock Ranger District and FHWA are..., Project Leader, Bend- Fort Rock Ranger District, 63095 Deschutes Market Road, Bend, OR 97701, phone 541...

  9. A brief geological history of Cockspur Island at Fort Pulaski National Monument, Chatham County, Georgia

    Science.gov (United States)

    Swezey, Christopher S.; Seefelt, Ellen L.; Parker, Mercer

    2018-03-09

    Fort Pulaski National Monument is located on Cockspur Island in Chatham County, Georgia, within the Atlantic Coastal Plain province. The island lies near the mouth of the Savannah River, and consists of small mounds (hummocks), salt marshes, and sediment dredged from the river. A 1,017-foot (ft) (310-meter [m])-deep core drilled at Cockspur Island in 2010 by the U.S. Geological Survey revealed several sedimentary units ranging in age from 43 million years old to present. Sand and mud are present at drilling depths from 0 to 182 ft (56 m), limestone is present at depths from 182 ft (56 m) to 965 ft (295 m), and glauconitic sand is present at depths from 965 ft (295 m) to 1,017 ft (310 m). The limestone and the water within the limestone are referred to collectively as the Floridan aquifer system, which is the primary source of drinking water for the City of Savannah and surrounding communities. In addition to details of the subsurface geology, this fact sheet identifies the following geologic materials used in the construction of Fort Pulaski: (1) granite, (2) bricks, (3) sandstone, and (4) lime mud with oyster shells.

  10. Cannon Fire Soon to Accompany Bugle Call at Fort Detrick | Poster

    Science.gov (United States)

    Beginning June 14, the familiar bugle calls at Fort Detrick will be joined by a special percussion instrument: a cannon. A single cannon shot will be fired on the first note of “Reveille,” which signals the start of each day and is accompanied by the raising of the American flag. “Reveille” sounds at 6:30 a.m. At 5 p.m., Fort Detrick plays “Retreat,” which alerts the post that

  11. Site-Based Budgeting in Fort Worth, Texas.

    Science.gov (United States)

    Peternick, Lauri; Sherman, Joel

    1998-01-01

    Examines the Fort Worth Independent School District's decentralized decision-making system through three lenses: a review of site-based decision-making procedures at several schools; an examination of who participates; and stakeholders' perceptions. Some schools operated democratically, significantly including teachers, parents, and community…

  12. Construction experience on PCRV liners at Fort St. Vrain

    International Nuclear Information System (INIS)

    Cliff, J.O.; Wunderlich, R.G.

    1976-01-01

    The construction of the steel liners for the Fort St. Vrain prestressed concrete reactor vessel presented many unique problems for which techniques were developed to satisfy the rigid specification requirements. The PCRV cavity liner was fabricated from 1.9cm carbon steel plate. The liners were partially fabricated by Pittsburgh-Des Moines Steel Company at their Pittsburgh manufacturing facility. The liners were then shipped by rail to within approximately five miles of the jobsite and then trucked the remaining distance. The construction techniques, dimensional control, concrete support and testing utilized on the Fort St. Vrain project are presented in detail and demonstrate the flexibility of the PCRV for field construction. (author)

  13. Characteristics of potential repository wastes: Volume 4, Appendix 4A, Nuclear reactors at educational institutions of the United States; Appendix 4B, Data sheets for nuclear reactors at educational institutions; Appendix 4C, Supplemental data for Fort St. Vrain spent fuel; Appendix 4D, Supplemental data for Peach Bottom 1 spent fuel; Appendix 4E, Supplemental data for Fast Flux Test Facility

    International Nuclear Information System (INIS)

    1992-07-01

    Volume 4 contains the following appendices: nuclear reactors at educational institutions in the United States; data sheets for nuclear reactors at educational institutions in the United States(operational reactors and shut-down reactors); supplemental data for Fort St. Vrain spent fuel; supplemental data for Peach Bottom 1 spent fuel; and supplemental data for Fast Flux Test Facility

  14. 77 FR 9960 - Final Environmental Impact Statement for Extension of F-Line Streetcar Service to Fort Mason...

    Science.gov (United States)

    2012-02-21

    ... Environmental Impact Statement for Extension of F-Line Streetcar Service to Fort Mason Center, San Francisco, CA... Environmental Impact Statement for the Extension of F-Line Streetcar Service to Fort Mason Center, San Francisco... the extension of the historic streetcar F-line from Fisherman's Wharf to the Fort Mason Center, in San...

  15. BRAND EQUITY OF LAHORE FORT AS A TOURISM DESTINATION BRAND

    Directory of Open Access Journals (Sweden)

    Muhammad Kashif

    2015-06-01

    Full Text Available Studies that measure the brand equity of destination brands by using the Customer-Based Brand Equity (CBBE model in a developing country context are scarce. The present study investigates the destination brand equity of the Lahore Fort by employing the CBBE model in a developing country context of Pakistan. Following the positivist tradition, we adopted a survey-based approach to collect data from 237 tourists visiting the Lahore Fort. Data were collected through a questionnaire developed to explain the relationship of brand awareness, brand image, brand association, and brand loyalty with Lahore Fort’s overall brand equity. We used various robust statistical techniques such as correlation, regression and confirmatory factor analysis (using PLS method to reach meaningful conclusions and found that brand image and brand associations positively contribute to brand loyalty. Furthermore, brand loyalty significantly contributes towards overall brand equity. Pragmatically, this study measures the customer based brand equity of the Lahore Fort, a destination brand. The results are useful as they suggest a few strategies that can help policy makers to enhance Lahore Fort’s brand performance.

  16. National Training Center Fort Irwin expansion area aquatic resources survey

    Energy Technology Data Exchange (ETDEWEB)

    Cushing, C.E.; Mueller, R.P.

    1996-02-01

    Biologists from Pacific Northwest National Laboratory (PNNL) were requested by personnel from Fort Irwin to conduct a biological reconnaissance of the Avawatz Mountains northeast of Fort Irwin, an area for proposed expansion of the Fort. Surveys of vegetation, small mammals, birds, reptiles, amphibians, and aquatic resources were conducted during 1995 to characterize the populations and habitats present with emphasis on determining the presence of any species of special concern. This report presents a description of the sites sampled, a list of the organisms found and identified, and a discussion of relative abundance. Taxonomic identifications were done to the lowest level possible commensurate with determining the status of the taxa relative to its possible listing as a threatened, endangered, or candidate species. Consultation with taxonomic experts was undertaken for the Coleoptera ahd Hemiptera. In addition to listing the macroinvertebrates found, the authors also present a discussion related to the possible presence of any threatened or endangered species or species of concern found in Sheep Creek Springs, Tin Cabin Springs, and the Amargosa River.

  17. Comparison of maxillary stability after Le Fort I osteotomy for occlusal cant correction surgery and maxillary advanced surgery.

    Science.gov (United States)

    Ueki, Koichiro; Hashiba, Yukari; Marukawa, Kohei; Yoshida, Kan; Shimizu, Chika; Nakagawa, Kiyomasa; Yamamoto, Etsuhide

    2007-07-01

    To compare postoperative maxillary stability following Le Fort I osteotomy for the correction of occlusal cant as compared with conventional Le Fort I osteotomy for maxillary advancement. The subjects were 40 Japanese adults with jaw deformities. Of these, 20 underwent a Le Fort I osteotomy and intraoral vertical ramus osteotomy (IVRO) to correct asymmetric skeletal morphology and inclined occlusal cant. The other 20 patients underwent a Le Fort I osteotomy and sagittal split ramus osteotomy (SSRO) to advance the maxilla. Lateral and posteroanterior cephalograms were taken postoperatively and assessed statistically. Thereafter, the 2 groups were followed for time-course changes. There was no significant difference between the 2 groups with regard to time-course changes during the immediate postoperative period. This suggests that maxillary stability after Le Fort I osteotomy for cant correction does not differ from that after Le Fort I osteotomy for maxillary advancement.

  18. The evaluation of a 4000-home geothermal heat pump retrofit at Fort Polk, Louisiana: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, P.J.; Shonder, J.A.

    1998-03-01

    This report documents an independent evaluation of an energy retrofit of 4,003 family housing units at Fort Polk, Louisiana, under an energy savings performance contract (ESPC). Replacement of the heating, cooling, and water heating systems in these housing units with geothermal heat pumps (GHPs) anchored the retrofit; low-flow shower heads and compact fluorescent lighting were also installed, as well as attic insulation where needed. Statistically valid findings indicate that the project will save 25.8 million kWh, or 32.5% of the pre-retrofit whole-community electrical consumption, and 100% of the whole-community natural gas previously used for space conditioning and water heating (260,000 therms) in a typical meteorological year. At the end-use level, the GHPs were found to save about 42% of the pre-retrofit electrical consumption for heating, cooling, and water heating in housing units that were all-electric in the pre-retrofit period. This report also demonstrates an improved method of predicting energy savings. Using an engineering model calibrated to pre-retrofit energy use data collected in the field, the method predicted actual energy savings on one of the electric feeders at Fort Polk with a very high degree of accuracy. The accuracy of this model was in turn dependent on data-calibrated models of the geothermal heat pump and ground heat exchanger that are described in this report. In addition this report documents the status of vertical borehole ground heat exchanger (BHEx) design methods at the time this project was designed, and demonstrates methods of using data collected from operating GHP systems to benchmark BHEx design methods against a detailed engineering model calibrated to date. The authors also discuss the ESPC`s structure and implementation and how the experience gained here can contribute to the success of future ESPCs.

  19. Overview--Development of a geodatabase and conceptual model of the hydrogeologic units beneath Air Force Plant 4 and Naval Air Station-Joint Reserve Base Carswell Field, Fort Worth, Texas

    Science.gov (United States)

    Shah, Sachin D.

    2004-01-01

    Air Force Plant 4 (AFP4) and adjacent Naval Air Station-Joint Reserve Base Carswell Field (NAS–JRB) at Fort Worth, Tex., constitute a contractor-owned, government-operated facility that has been in operation since 1942. Contaminants from the 3,600-acre facility, primarily volatile organic compounds (VOCs) and metals, have entered the ground-water-flow system through leakage from waste-disposal sites and from manufacturing processes. Environmental data collected at AFP4 and NAS–JRB during 1993–2002 created the need for consolidation of the data into a comprehensive temporal and spatial geodatabase. The U.S. Geological Survey (USGS), in cooperation with the U.S. Air Force Aeronautical Systems Center Environmental Management Directorate, developed a comprehensive geodatabase of temporal and spatial environmental data associated with the hydrogeologic units beneath the facility. A three-dimensional conceptual model of the hydrogeologic units integrally linked to the geodatabase was designed concurrently. Three hydrogeologic units—from land surface downward, the alluvial aquifer, the GoodlandWalnut confining unit, and the Paluxy aquifer—compose the subsurface of interest at AFP4 and NAS–JRB. The alluvial aquifer consists primarily of clay and silt with sand and gravel channel deposits that might be interconnected or interfingered. The Goodland-Walnut confining unit directly underlies the alluvial aquifer and consists of limestone, marl, shale, and clay. The Paluxy aquifer is composed of dense mudstone and fine- to coarse-grained sandstone

  20. United States Air Force Summer Faculty Research Program (1986). Program Technical Report. Volume 3

    Science.gov (United States)

    1986-12-01

    is a hyperattentive state where the person is so intent on the task at hand that he/she naturally disregards irrelevant stimuli such as hunger or the...A. (1981). Interpretation of the Halstead-Reitan neuropsychological test battery. New York: Brune & Stratton. Hart, S. G., & Sheridan, T. B. (1984

  1. Feltarbejde i Thule. Sammenfiltringen af steder, folk og fortællinger

    Directory of Open Access Journals (Sweden)

    Kirsten Hastrup

    2016-07-01

    Full Text Available På baggrund af lang tids arbejde i Thuleregionen i det nordvestligste Grønland vil jeg diskutere, hvordan steder, folk og fortællinger gensidigt former hinanden. ’Felten’ er således formateret af mange forhold, historiske og nutidige, naturlige og kulturelle, og man må besinde sig på feltens flydende form, selv når den ser mest solid ud. Steder er i sig selv flygtige; de opstår i mødet med mennesker, som tillægger dem betydning. Folk kan se nok så traditionelle ud, men de lever i samme verden som antropologen, der kommer for at lære af dem. Endelig er fortællingerne ikke stivnede vidnesbyrd om tidligere tider; de er tværtimod et vigtigt redskab i håndteringen af højst nutidige udfordringer, som kommer til syne i det endnu ufortalte. Bag fortællingen om Thule ligger en større diskussion af enhver felts plasticitet.

  2. Generalized surficial geologic map of the Fort Irwin area, San Bernadino: Chapter B in Geology and geophysics applied to groundwater hydrology at Fort Irwin, California

    Science.gov (United States)

    Miller, David M.; Menges, Christopher M.; Lidke, David J.; Buesch, David C.

    2014-01-01

    The geology and landscape of the Fort Irwin area, typical of many parts of the Mojave Desert, consist of rugged mountains separated by broad alluviated valleys that form the main coarse-resolution features of the geologic map. Crystalline and sedimentary rocks, Mesozoic and older in age, form most of the mountains with lesser accumulations of Miocene sedimentary and volcanic rocks. In detail, the area exhibits a fairly complex distribution of surficial deposits resulting from diverse rock sources and geomorphology that has been driven by topographic changes caused by recent and active faulting. Depositional environments span those typical of the Mojave Desert: alluvial fans on broad piedmonts, major intermittent streams along valley floors, eolian sand dunes and sheets, and playas in closed valleys that lack through-going washes. Erosional environments include rocky mountains, smooth gently sloping pediments, and badlands in readily eroded sediment. All parts of the landscape, from regional distribution of mountains, valleys, and faults to details of degree of soil development in surface materials, are portrayed by the surficial geologic map. Many of these attributes govern infiltration and recharge, and the surface distribution of permeable rock units such as Miocene sedimentary and volcanic rocks provides a basis for evaluating potential groundwater storage. Quaternary faults are widespread in the Fort Irwin area and include sinistral, east-striking faults that characterize the central swath of the area and the contrasting dextral, northwest-striking faults that border the east and west margins. Bedrock distribution and thickness of valley-fill deposits are controlled by modern and past faulting, and faults on the map help to identify targets for groundwater exploration.

  3. Smithsonian Marine Station (SMS) at Fort Pierce

    Science.gov (United States)

    share current Smithsonian research on the plants and animals of the Indian River Lagoon and marine Smithsonian Marine Station at Fort Pierce Website Search Box Search Field: SMS Website Search Twitter SMS Home › Welcome to the Smithsonian Marine Station Homepage slideshow Who We Are... The

  4. Aerial gamma ray and magnetic survey: Powder River R and D Project. Portions of the: Forsyth, Hardin, Montana Quadrangles; Sheridan, Arminto, Wyoming Quadrangles. Final report

    International Nuclear Information System (INIS)

    1979-05-01

    Thick Phaneorozoic sediments (greater than 17,000 feet) fill the northwest-trending Powder River Basin, which is the dominant tectonic structure in the study area. Lower Tertiary sediments comprise over 90% of the exposed units at the surface of the Basin. Small portions of the Bighorn Uplift, Casper Arch, and Porcupine Dome occupy the western edge of the study area. Numerous small claims and prospects are found in the Pumpkin Buttes - Turnercrest District at the south end of the study area (northeastern Arminto quadrangle). No economic deposits of uranium are known to exist in the area, according to available literature. Interpretation of the radiometric data resulted in 62 statistical uranium anomalies listed for this area. Most anomalies are found in the southern half of the study area within the Tertiary Fort Union and Wasatch Formations. Some are found in Cretaceous sediments in the adjoining uplifts to the west of the Basin

  5. RadNet Air Data From Fort Smith, AR

    Science.gov (United States)

    This page presents radiation air monitoring and air filter analysis data for Fort Smith, AR from EPA's RadNet system. RadNet is a nationwide network of monitoring stations that measure radiation in air, drinking water and precipitation.

  6. Development of a geodatabase and conceptual model of the hydrogeologic units beneath air force plant 4 and Naval Air Station-Joint Reserve Base Carswell Field, Fort Worth, Texas

    Science.gov (United States)

    Shah, Sachin D.

    2004-01-01

    Air Force Plant 4 and adjacent Naval Air Station-Joint Reserve Base Carswell Field at Fort Worth, Texas, constitute a government-owned, contractor-operated facility that has been in operation since 1942. Contaminants from AFP4, primarily volatile organic compounds and metals, have entered the ground-water-flow system through leakage from waste-disposal sites and from manufacturing processes. The U.S. Geological Survey developed a comprehensive geodatabase of temporal and spatial environmental information associated with the hydrogeologic units (alluvial aquifer, Goodland-Walnut confining unit, and Paluxy aquifer) beneath the facility and a three-dimensional conceptual model of the hydrogeologic units integrally linked to the geodatabase. The geodatabase design uses a thematic layer approach to create layers of feature data using a geographic information system. The various features are separated into relational tables in the geodatabase on the basis of how they interact and correspond to one another. Using the geodatabase, geographic data at the site are manipulated to produce maps, allow interactive queries, and perform spatial analyses. The conceptual model for the study area comprises computer-generated, three-dimensional block diagrams of the hydrogeologic units. The conceptual model provides a platform for visualization of hydrogeologic-unit sections and surfaces and for subsurface environmental analyses. The conceptual model is based on three structural surfaces and two thickness configurations of the study area. The three structural surfaces depict the altitudes of the tops of the three hydrogeologic units. The two thickness configurations are those of the alluvial aquifer and the Goodland-Walnut confining unit. The surface of the alluvial aquifer was created using a U.S. Geological Survey 10-meter digital elevation model. The 2,130 point altitudes of the top of the Goodland-Walnut unit were compiled from lithologic logs from existing wells, available soil

  7. Slaget ved Vejle og andre fortællinger fra Jyske Bank

    DEFF Research Database (Denmark)

    Albrechtsen, Charlotte

    Storytelling som ledelsesværktøj er en form for retorik idet formålet med at bruge fortællinger i kommunikationen fra ledelse til medarbejdere er at påvirke modtagerne/medarbejderne. Imidlertid er refleksioner over modtagerinstansen så godt som fraværende både i den populære debat om storytelling...... og i den eksisterende forskning i emnet. Foruden at introducere til forskningen i storytelling præsenterer artiklens forfatter, som er ph.d.-studerende, en modtagerorienteret analyse af en fortælling fra Jyske Bank....

  8. Low footwall accelerations and variable surface rupture behavior on the Fort Sage Mountains fault, northeast California

    Science.gov (United States)

    Briggs, Richard W.; Wesnousky, Steven G.; Brune, James N.; Purvance, Matthew D.; Mahan, Shannon

    2013-01-01

    The Fort Sage Mountains fault zone is a normal fault in the Walker Lane of the western Basin and Range that produced a small surface rupture (L 5.6 earthquake in 1950. We investigate the paleoseismic history of the Fort Sage fault and find evidence for two paleoearthquakes with surface displacements much larger than those observed in 1950. Rupture of the Fort Sage fault ∼5.6  ka resulted in surface displacements of at least 0.8–1.5 m, implying earthquake moment magnitudes (Mw) of 6.7–7.1. An older rupture at ∼20.5  ka displaced the ground at least 1.5 m, implying an earthquake of Mw 6.8–7.1. A field of precariously balanced rocks (PBRs) is located less than 1 km from the surface‐rupture trace of this Holocene‐active normal fault. Ground‐motion prediction equations (GMPEs) predict peak ground accelerations (PGAs) of 0.2–0.3g for the 1950 rupture and 0.3–0.5g for the ∼5.6  ka paleoearthquake one kilometer from the fault‐surface trace, yet field tests indicate that the Fort Sage PBRs will be toppled by PGAs between 0.1–0.3g. We discuss the paleoseismic history of the Fort Sage fault in the context of the nearby PBRs, GMPEs, and probabilistic seismic hazard maps for extensional regimes. If the Fort Sage PBRs are older than the mid‐Holocene rupture on the Fort Sage fault zone, this implies that current GMPEs may overestimate near‐fault footwall ground motions at this site.

  9. FORT NAMUTONI: FROM MILITARY STRONGHOLD TO TOURIST ...

    African Journals Online (AJOL)

    STRONGHOLD TO TOURIST CAMP. Col Dr Jan Ploeger*. "... this fortress was not just a white elephant, it was actually occupied and played a major role in the settlement of Germans in the far North." (own translation) - D.W. Krynauw Die Verhaal van. Namutoni, p 3. Introduction. Fort Namutoni, the last White outpost east of ...

  10. 78 FR 28622 - Notice of Approval of Record of Decision for Extending F-Line Streetcar Service to Fort Mason...

    Science.gov (United States)

    2013-05-15

    ...] Notice of Approval of Record of Decision for Extending F-Line Streetcar Service to Fort Mason Center... Environmental Impact Statement (Final EIS) for extending the F-Line historic streetcar service to Fort Mason... turnaround terminus at the Fort Mason Center; and installing appurtenant features such as signals, crossings...

  11. 77 FR 71636 - Huntington Foam LLC, Fort Smith, AR; Notice of Revised Determination on Reconsideration

    Science.gov (United States)

    2012-12-03

    ... Smith, AR; Notice of Revised Determination on Reconsideration On August 8, 2012, the Department of Labor... workers and former workers of Huntington Foam LLC, Fort Smith, Arkansas (subject firm). The workers are... reconsideration investigation, I determine that workers of Huntington Foam LLC, Fort Smith, Arkansas, who were...

  12. Maxillary distraction osteogenesis at Le Fort-I level induces bone apposition at infraorbital rim.

    Science.gov (United States)

    Rattan, Vidya; Jena, Ashok Kumar; Singh, Satinder Pal; Utreja, Ashok Kumar

    2014-09-01

    The aim of this study is to evaluate whether there is any remodeling of bone at infraorbital rim following maxillary distraction osteogenesis (DO) at Le Fort-I level. Twelve adult subjects in the age range of 17-21 years with complete unilateral cleft lip and palate underwent advancement of the maxilla by DO. The effect of maxillary DO on the infraorbital rim remodeling was evaluated from lateral cephalograms recorded prior to the DO (T0), at the end of DO (T1), and at least 2-years after the DO (T2) by Walker's analysis. The ANOVA and two-tailed t test were used and probability value (P value) 0.05 was considered as statistically significant level. There was anterior movement of maxilla by 9.22 ± 3.27 mm and 7.67 ± 3.99 mm at the end of immediate (T1) and long-term (T2) follow-up of maxillary DO, respectively. The Walker's analysis showed 1.49 ± 1.22 mm and 2.31 ± 1.81 mm anterior movement of the infraorbital margin (Orbitale point) at the end of T1 and T2, respectively (P distraction osteogenesis at Le Fort-I level induced significant bone apposition at infraorbital rim. Patients with mild midface hypoplasia who would otherwise may be candidates for osteotomy at Le Fort-II or Le Fort-III level may benefit from maxillary distraction at Le Fort-I level.

  13. Wood-Fired Boiler System Evaluation at Fort Stewart, GA

    National Research Council Canada - National Science Library

    Potts, Noel

    2002-01-01

    Part of the plan to modernize the central energy plant (CEP) at Fort Stewart, GA is focused on the installations wood-fired boiler, which provides steam for heating, cooling, and domestic hot water. The U.S...

  14. Wind resource assessment and wind energy system cost analysis: Fort Huachuca, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    Olsen, T.L. [Tim Olsen Consulting, Denver, CO (United States); McKenna, E. [National Renewable Energy Lab., Golden, CO (United States)

    1997-12-01

    The objective of this joint DOE and National Renewable Energy Laboratory (NREL) Strategic Environmental Research and Development Program (SERDP) project is to determine whether wind turbines can reduce costs by providing power to US military facilities in high wind areas. In support of this objective, one year of data on the wind resources at several Fort Huachuca sites was collected. The wind resource data were analyzed and used as input to an economic study for a wind energy installation at Fort Huachuca. The results of this wind energy feasibility study are presented in the report.

  15. Surgical risk factors and maxillary nerve function after le fort I osteotomy

    DEFF Research Database (Denmark)

    Thygesen, Torben Henrik; Jensen, Allan Bardow; Norholt, SE

    2009-01-01

    PURPOSE: Data on intraoperative risk factors for long-term postoperative complications after Le Fort I osteotomy (LFO) are limited. The aim of this study was to describe prospectively the overall postoperative changes in maxillary nerve function after LFO, and to correlate these changes with a nu......PURPOSE: Data on intraoperative risk factors for long-term postoperative complications after Le Fort I osteotomy (LFO) are limited. The aim of this study was to describe prospectively the overall postoperative changes in maxillary nerve function after LFO, and to correlate these changes...

  16. Status of the Fort St. Vrain decommissioning

    International Nuclear Information System (INIS)

    Fisher, M.J.

    1990-01-01

    Fort St. Vrain is a high temperature gas cooled reactor. It has been shut down as a result of financial and technical difficulties. Fort St. Vrain has been planning for defueling and decommissioning for at least three years. The preliminary decommissioning plan, in accordance with the NRC's final rule, has been submitted and is being reviewed by the NRC. The basis of the preliminary decommissioning plan has been SAFSTOR. Public Service Company, who is the owner and operator of FSV, is scheduled to submit a proposed decommissioning plan to the NRC in the fourth quarter of 1990. PSC has gone out for bid on the decontamination and dismantlement of FSV. This paper includes the defueling schedule, the independent spent fuel storage installation status, the probability of shipping fuel to DOE, the status of the preliminary decommissioning plan submittal, the issuance of a possession only license and what are the results of obtaining this license amendment, preliminary decommissioning activities allowed prior to the approval of a proposed decommissioning plan, the preparation of a proposed decommissioning plan and the status of our decision to proceed with SAFSTOR or DECON as identified in the NRC's final decommissioning rule

  17. Strategic Analysis and Plan for Implementing Telemedicine at Fort Greely

    National Research Council Canada - National Science Library

    Bolton, Karl

    2003-01-01

    .... To best accomplish this, a strategic analysis and business case analysis was conducted. Introspective strategic analysis tools revealed an organization that is capable of supporting a telemedicine program at Fort Greely...

  18. The Fort Smith radioactive belt, Northwest Territories

    International Nuclear Information System (INIS)

    Charbonneau, B.W.

    1980-01-01

    The Fort Smith Belt is an elongate zone, about 200 km x 50 km, extending from the East Arm of Great Slave Lake southerly into northeastern Alberta. The major feature of the belt is that it is one of the most radioactive regions so far recognized in the Canadian Shield. Potassium, uranium, and thorium are all enriched but the greatest increase is in thorium. The dominant rock type underlying the area is a foliated porphyritic granite. This rock contains an average of about 80 ppm thorium (with areas of tens of square kilometres containing up to 200 ppm) and approximately 11 ppm uranium. In places, dark elongate zones rich in biotite, apatite, and opaque minerals within the porphyritic granite may contain an order of magnitude more uranium and thorium than the porphyry. Radioactive minerals within both the porphyry and the dark zones are principally monazite (containing up to 16% ThO 2 ) and isolated grains of uraninite. This foliated porphyritic granite is interpreted as being pre- or syntectonic with respect to the Hudsonian event because its foliation parallels that of the surrounding rocks. There has been subsequent deformation. The second characteristic feature of the Fort Smith Belt is the development of a peripheral zone where eU is enriched relative to eTh correlating mainly with granitoid rocks which surround the thorium-rich area and wherein ratios of eU/eTh exceed 1:2 (compared to the crustal average of 1:4). Uranium may have moved laterally into this marginal area from the thorium-rich porphyry, possibly in a vapour phase. There is a possibility that concentrations of uranium as well as other metals such as Cu, Mo, Zn, Sn, and W could exist in the porphyry and its margin in appropriate chemical and/or structural traps. The radioactive granite rocks of the Fort Smith Belt are adjacent to uranium-thorium occurrences in the nearby Proterozoic Nonacho sediments but whether or not a genetic relationship exists between the two situations is uncertain. (auth)

  19. The Fall of Fort Eben Emael: The Effects of Emerging Technologies on the Successful Completion of Military Objectives

    Science.gov (United States)

    2004-06-18

    of Sickle,” World War II Magazine, November 2003, 59. 11Ibid., 60. 12Abbeville is 100 miles north of Paris near the English Channel. 13T. N. Mout... catacombs of Fort Eben Emael. A further understanding of the dynamics of the fort and her defenders can be gained by the knowledge that that fort was...Green Devils German Paratroopers 1939-45 ( Paris , France: Histories & Collections, 1997), 27. Helmut Wenzl (Left in photo) Born - 10 March

  20. 75 FR 39051 - Desoto Mills LLC, Fort Payne, AL; Notice of Negative Determination Regarding Application for...

    Science.gov (United States)

    2010-07-07

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-73,416] Desoto Mills LLC, Fort... applicable to workers and former workers at Desoto Mills, LLC, a Subsidiary of Fruit of the Loom, Fort Payne... * * * locations outside the Desoto Mills Plant.'' The petitioner compares the situation at this location with...

  1. Opening remarks for the Fort Valley Centennial Celebration

    Science.gov (United States)

    G. Sam Foster

    2008-01-01

    The Rocky Mountain Research Station recognizes and values the contributions of our scientists and collaborators for their work over the past century at Fort Valley Experimental Forest. With the help of our partners and collaborators, Rocky Mountain Research Station is working to improve coordination across its research Program Areas and Experimental Forests and Ranges...

  2. A visual progression of the Fort Valley Restoration Project treatments using remotely sensed imagery (P-53)

    Science.gov (United States)

    Joseph E. Crouse; Peter Z. Fule

    2008-01-01

    The landscape surrounding the Fort Valley Experimental Forest in northern Arizona has changed dramatically in the past decade due to the Fort Valley Restoration Project, a collaboration between the Greater Flagstaff Forest Partnership, Coconino National Forest, and Rocky Mountain Research Station. Severe wildfires in 1996 sparked community concern to start restoration...

  3. Fortællinger om sorg og tab – når det personlige bliver socialt?

    DEFF Research Database (Denmark)

    Christensen, Dorthe Refslund; Sandvik, Kjetil

    2016-01-01

    Vi fortæller om døden, om det at miste og føle sorg. Kulturhistorisk er litteratur, teater og malerkunst scener for netop dette emne. Som socialt fænomen ser vi dog ikke i samme omfang fortællinger om død, tab og sorg, eftersom emnet typisk har været anskuet som et privat anliggende. Bestemte...

  4. Analysis and evaluation of recent operational experience from the Fort St. Vrain HTGR

    International Nuclear Information System (INIS)

    Moses, D.L.; Lanning, W.D.

    1985-05-01

    The Fort St. Vrain operating experience to be discussed here includes notable safety-related events which have occurred since late 1981 when ORNL was first contracted to provide technical assistance to AEOD. Earlier Fort St. Vrain operating experience through the time of successful full-power testing in November 1981 has been summarized by the licensee and the reactor vendor, GA Technologies, Inc. (GA), in papers presented at several different forums during 1982. In addition, extensive and very useful detailed evaluations of preoperational and startup testing and of the rise-to-power operating experience through completion of the first refueling outage in August 1979 have been compiled into a series of reports under the sponsorship of the Electric Power Research Institute (EPRI). Finally, the US Department of Energy's Fort St. Vrain Improvement Plan provides a summary of the major operational limits which have affected the plant since start-up. The events discussed here are categorized based on the major systems affected, namely, (1) primary system and reactor vessel, (2) electrical systems, and (3) the reactor building. In all cases to be discussed, the lessons to be learned are vigilance and prevention. These lessons translate into the need for the recognition and control of unexpected situations and of their potential for branching effects. At Fort St. Vrain, these lessons are found in the effects of moisture ingress, in the challenges experienced to the supply of essential electrical power, and in controlling the environment of the reactor building. 13 refs

  5. Raising the camp living bar : a Shell Canada and Fort MacKay First Nation joint venture results in a unique housing solution

    Energy Technology Data Exchange (ETDEWEB)

    Stastny, P.

    2006-11-15

    Shell Canada and the Fort MacKay First Nation have joined forces to construct the Buena Vista Hotel, a staff accommodation project for Shell, Chevron, and Western project managers and supervisors. The hotel will provide a higher level of comfort than current housing available to employees in the Athabasca region, and it is hoped that the project will help to attract more employees. Under the arrangement, Shell and its partners will have exclusive access to the hotel for the first 10 years, and there is a commitment from Fort MacKay First Nation to purchase the hotel outright within a certain period. To oversee the hotel's construction, the First Nations band formed a construction company and partnered with the Milk Creek Group. The hotel is currently being constructed in Saskatchewan and will be trucked to Fort MacKay in 279 modules. The 12 by 28 foot units are fully appointed with carpets, millwork, painted walls and granite countertops. After being trucked to Alberta, the modules will be assembled and stacked along central hallways built on-site. A Vancouver-based architect designed the overall concept for the hotel, and aimed to blend the project into its environment wherever possible by leaving buffers of trees. Many of the rooms will have beautiful views of the river. It was concluded that Aboriginal involvement has been a crucial factor in the hotel's development. 1 fig.

  6. Fort St. Vrain core performance

    International Nuclear Information System (INIS)

    McEachern, D.W.; Brown, J.R.; Heller, R.A.; Franek, W.J.

    1977-07-01

    The Fort St. Vrain High Temperature Gas Cooled Reactor core performance has been evaluated during the startup testing phase of the reactor operation. The reactor is graphite moderated, helium cooled, and uses coated particle fuel and on-line flow control to each of the 37 refueling regions. Principal objectives of startup testing were to determine: core and control system reactivity, radial power distribution, flow control capability, and initial fission product release. Information from the core demonstrates that Technical Specifications are being met, performance of the core and fuel is as expected, flow and reactivity control are predictable and simple for the operator to carry out

  7. Rail Outloading Capability Study, Fort Polk, Louisiana,

    Science.gov (United States)

    1977-06-01

    regardless of experience, to avoid wasted man -hours. The main problem at Fort Polk is that no blocking and bracing material stockpile exists and no...ti1 hottul only thtrough the 0111crinost hole; to defect within 20 days after it is determined to -tuit Owt ttrtk in tuse. III thle caste of classes 3...wheels, slipping, or similar trak (meh causes. 1 -------------------- (12) " Shelly spots" means a condition 2 ------------------------ % where a thin

  8. 78 FR 78380 - Notice of Inventory Completion: U.S. Department of the Interior, National Park Service, Fort...

    Science.gov (United States)

    2013-12-26

    ... completion of an inventory of human remains under the control of Fort Bowie National Historic Site, Bowie, AZ....R50000] Notice of Inventory Completion: U.S. Department of the Interior, National Park Service, Fort... completed an inventory of human remains, in consultation with the appropriate Indian tribes or Native...

  9. Fra erfaringer til betydninger: Tolkning af fortællinger om eksamensgruppebegivenheder fra folkeskolelærerstuderende ved Aalborg Seminarium

    DEFF Research Database (Denmark)

    Silleborg, Ellen

    2004-01-01

    karakter. Denne situation giveruoverensstemmelser i de studerendes følelsesliv, og hovedparten af fortællingerne afspejler en i mange henseender konfliktfyldt eksamensgruppeproces. I fortællingernes betydninger ses en loyal men privatiseret etik, hvor ansvarlighed bliver til selvskyld. Alle implicerede...

  10. La fouille du fort Saint-Georges à Chinon (Indre-et-Loire. Premiers résultats The excavation of fort Saint-Georges at Chinon (Indre-et-Loire. First results

    Directory of Open Access Journals (Sweden)

    Bruno Dufaÿ

    2006-05-01

    Full Text Available Cette note présente les premiers résultats des fouilles menées en 2003 et 2004 sur la quasi-totalité du fort Saint-Georges à Chinon (Indre-et-Loire. Celui-ci est l’un des trois éléments de la forteresse médiévale qui domine la ville. La fouille a permis de préciser la fonction du fort, construit dans la deuxième moitié du XIIe s., à l’époque où Chinon est le centre administratif des possessions continentales des Plantagenêt, rois d’Angleterre. Du point de vue militaire, il formait une fortification avancée, protégeant le château principal, selon une structure que Richard Cœur de Lion appliquera au Château Gaillard. À l’intérieur, de vastes bâtiments constituaient des logis, conçus peut-être au départ pour héberger la chancellerie royale.This article presents the first results of the excavations undertaken in 2003 and 2004 over almost all of the Fort Saint-Georges at Chinon (Indre-et-Loire, one of three elements of the medieval fortress which dominates the town. The excavation enabled us to clarify the function of the fort, built in the 2nd half of the 12th century at a time when Chinon was the administrative centre of the continental possesions of the Plantagenet King of England. From a military point of view, it formed an advanced fortification protecting the main castle, within a structure that Richard the Lionheart would apply to the Chayeau Gaillard. Inside, some vast buildings made up the dwellings, designed perhaps initially to house the royal chanceller.

  11. Airborne electromagnetic data and processing within Leach Lake Basin, Fort Irwin, California: Chapter G in Geology and geophysics applied to groundwater hydrology at Fort Irwin, California

    Science.gov (United States)

    Bedrosian, Paul A.; Ball, Lyndsay B.; Bloss, Benjamin R.; Buesch, David C.

    2014-01-01

    From December 2010 to January 2011, the U.S. Geological Survey conducted airborne electromagnetic and magnetic surveys of Leach Lake Basin within the National Training Center, Fort Irwin, California. These data were collected to characterize the subsurface and provide information needed to understand and manage groundwater resources within Fort Irwin. A resistivity stratigraphy was developed using ground-based time-domain electromagnetic soundings together with laboratory resistivity measurements on hand samples and borehole geophysical logs from nearby basins. This report releases data associated with the airborne surveys, as well as resistivity cross-sections and depth slices derived from inversion of the airborne electromagnetic data. The resulting resistivity models confirm and add to the geologic framework, constrain the hydrostratigraphy and the depth to basement, and reveal the distribution of faults and folds within the basin.

  12. 77 FR 37318 - Eighth Coast Guard District Annual Safety Zones; Sound of Independence; Santa Rosa Sound; Fort...

    Science.gov (United States)

    2012-06-21

    ...-AA00 Eighth Coast Guard District Annual Safety Zones; Sound of Independence; Santa Rosa Sound; Fort... Coast Guard will enforce a Safety Zone for the Sound of Independence event in the Santa Rosa Sound, Fort... during the Sound of Independence. During the enforcement period, entry into, transiting or anchoring in...

  13. Forest pathology and entomology at Fort Valley Experimental Forest

    Science.gov (United States)

    Brian W. Geils

    2008-01-01

    Forest pathology and entomology have been researched at Fort Valley Experimental Forest throughout its history. The pathogens and insects of particular interest are mistletoes, decay and canker fungi, rusts, bark beetles, and various defoliators. Studies on life history, biotic interactions, impacts, and control have been published and incorporated into silvicultural...

  14. Soldier Satisfaction with Life in Restructured Units during Phase 1 of the Restructuring of the Heavy Division Test

    Science.gov (United States)

    1979-09-01

    working and living in their units during the estructuring of the Heavy Division test at Fort Hood, TX. The questionnaire -as administered to unit...to a control group of soldiers who did not estructure . Results of the study showed that immediately following DO ,’, 1473 EDITIONOF IOV SISO SOLFT

  15. Primary coolant chemistry of the Peach Bottom and Fort St. Vrain high-temperature gas-cooled reactors

    International Nuclear Information System (INIS)

    Burnette, R.D.; Baldwin, N.L.

    1980-11-01

    The chemical impurities in the primary coolants of the Peach Bottom and Fort St. Vrain reactors are discussed. The impurity mixtures in the two plants were quite different because the sources of the impurities were different. In the Peach Bottom reactor, the impurities were dominated by H 2 and CH 4 , which are decomposition products of oil. In the Fort St. Vrain reactor, there were high levels of CO, CO 2 , and H 2 O. Although oil ingress at Peach Bottom created carbon deposits on virtually all surfaces, its effect on reactor operation was negligible. Slow outgassing of water from the thermal insulation at Fort St. Vrain caused delays in reactor startup. The overall graphite oxidation in both plants was negligible

  16. Primary coolant chemistry of the Peach Bottom and Fort St. Vrain high temperature gas-cooled reactors

    International Nuclear Information System (INIS)

    Burnette, R.D.; Baldwin, N.L.

    1981-01-01

    The chemical impurities in the primary coolants of the Peach Bottom and Fort St. Vrain reactors are discussed. The impurity mixtures in the two plants were quite different because the sources of the impurities were different. In the Peach Bottom reactor, the impurities were dominated by H 2 and CH 4 , which are decomposition products of oil. In the Fort St. Vrain reactor, there were high levels of CO, CO 2 , and H 2 O. Although oil ingress at Peach Bottom created carbon deposits on virtually all surfaces, its effect on reactor operation was negligible. Slow outgassing of water from the thermal insulation at Fort St. Vrain caused delays in reactor startup. The overall graphite oxidation in both plants was negligible. (author)

  17. EXTENDING THE UNITED STATES NUCLEAR DETERRENCE UMBRELLA TO THE MIDDLE EAST

    Science.gov (United States)

    2016-05-01

    22 Robert D. Kaplan , Asia’s Cauldron: The South China Sea and the End of a Stable Pacific (New York: Random House, 2014), 166. 23 Office of the...25 Jean Lacouture, De Gaulle: The Ruler, 1945-1970, trans. Alan Sheridan (New York, NY: W. W. Norton and Company, 1992), 416. 26 Anderson and... Kaplan , Robert D. Asia’s Cauldron: The South China Sea and the End of a Stable Pacific. New York: Random House, 2014. Lacouture, Jean. De Gaulle

  18. Renewable Energy Opportunities at Fort Hood, Texas

    Energy Technology Data Exchange (ETDEWEB)

    Chvala, William D.; Warwick, William M.; Dixon, Douglas R.; Solana, Amy E.; Weimar, Mark R.; States, Jennifer C.; Reilly, Raymond W.

    2008-06-30

    The document provides an overview of renewable resource potential at Fort Hood based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 DoD Renewables Assessment. This effort focuses on grid-connected generation of electricity from renewable energy sources and also ground source heat pumps for heating and cooling buildings, as directed by IMCOM.

  19. Calculations of the three-dimensional power distribution in the Fort St. Vrain reactor using UK methods and data

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, D W

    1973-04-15

    Assessments of the ability of UK methods and data developed primarily for the low enriched uranium cycle to simulate thorium cycle HTRs haye been extended to cover reactivity and power distributions in commercial size reactors. The Fort St. Vrain 330 MW(E) HTR being built in the United States by Gulf General Atomic has been chosen as a convenient object for such a study since detailed design information together with the results of GGA's own calculations have been published. The results obtained are in good agreement with those obtained by GGA and indicate that both thorium and low enriched cycle HTRs can be adequately modelled with UK data and methods.

  20. Calculation of Void in the Fort Saint Vrain Material

    Energy Technology Data Exchange (ETDEWEB)

    Potter, David Charles [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Taylor, Craig Michael [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Coons, James Elmer [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-11

    The percent void of the Fort Saint Vrain (FSV) material is estimated to be 21.1% based on the volume of the gap at the top of the drums, the volume of the coolant channels in the FSV fuel element, and the volume of the fuel handling channel in the FSV fuel element.

  1. Hydrogeochemical cycling and chemical denudation in the Fort River Watershed, central Massachusetts: An appraisal of mass-balance studies

    Science.gov (United States)

    Yuretich, Richard F.; Batchelder, Gail L.

    1988-01-01

    The Fort River watershed in central Massachusetts receives precipitation with a composition similar to that in Hubbard Brook (New Hampshire), yet the average stream water chemistry is substantially different, showing higher pH and TDS. This is largely a function of bedrock and surficial geology, and chemical differences among small streams within the Fort River watershed are apparently controlled by the composition and thickness of the prevailing surficial cover. The surficial deposits determine groundwater and surface water flow paths, thereby affecting the resultant contact time with mineral matter and the chemistry of the runoff. Despite the rural setting, over 95% of the annual sodium and chloride in the streams comes from road salt; after correcting for this factor, cation denudation rates are about equal to those at Hubbard Brook. However, silica removal is occurring at a rate more than 30% greater in the Fort River. When climatic conditions in Hubbard Brook and Fort River are normalized, weathering rates appear consistently higher in the Fort River, reflecting differences in weathering processes (i.e., cation exchange and silicate breakdown) and hydrogeology. Because of uncertainties in mechanisms of cation removal from watersheds, the silica denudation rate may be a better index of weathering intensity.

  2. Sustainability Analysis of the Water Resources and Supply of the Vieux Fort Region of Saint Lucia

    Science.gov (United States)

    Coles, D.; Johnson, B.; Morgan, F.

    2005-05-01

    In the Vieux Fort region of the Caribbean island of St. Lucia, water needs are becoming acute. The water supply shortfalls during the dry season will continue to grow as population and development increase, unless action is taken. Actions to address the problem should include measures to optimize the present water delivery system and the development of a new supply, through new intakes, groundwater, or reservoir construction. An investigation into the potential for groundwater resources using electrical resistivity soundings indicated a likely pervasive, shallow aquitard of clay materials below the water table; the shallowness of this aquitard virtually precludes the existence of productive perched aquifers. Consequently, a model of Grande Riviere du Vieux Fort (Big Vieux Fort River) seasonal surface-water flow was developed, based on a digital elevation model and rainfall data, allowing us to analyze the possible productivity of any new intakes placed along the river. A specific site downstream of the present intake was recommended for potential development. Recommendations were given for short, medium and long-term development of the resources and supply of the Vieux Fort region of southern St. Lucia.

  3. Energy efficiency campaign for residential housing at the Fort Lewis army installation

    Energy Technology Data Exchange (ETDEWEB)

    AH McMakin; RE Lundgren; EL Malone

    2000-02-23

    In FY1999, Pacific Northwest National Laboratory conducted an energy efficiency campaign for residential housing at the Fort Lewis Army Installation near Tacoma, Washington. Preliminary weather-corrected calculations show energy savings of 10{percent} from FY98 for energy use in family housing. This exceeded the project's goal of 3{percent}. The work was funded by the U.S. DOEs Federal Energy Management Program (FEMP), Office of Energy Efficiency and Renewable Energy. The project adapted FEMP's national ``You Have the Power Campaign'' at the local level, tailoring it to the military culture. The applied research project was designed to demonstrate the feasibility of tailored, research-based strategies to promote energy conservation in military family housing. In contrast to many energy efficiency efforts, the campaign focused entirely on actions residents could take in their own homes, as opposed to technology or housing upgrades. Behavioral change was targeted because residents do not pay their own utility bills; thus other motivations must drive personal energy conservation. This campaign augments ongoing energy savings from housing upgrades carried out by Fort Lewis. The campaign ran from September 1998 through August 1999. The campaign strategy was developed based on findings from previous research and on input from residents and officials at Fort Lewis. Energy use, corrected to account for weather differences, was compared with the previous year's use. Survey responses from 377 of Fort Lewis residents of occupied housing showed that the campaign was moderately effective in promoting behavior change. Of those who were aware of the campaign, almost all said they were now doing one or more energy-efficient things that they had not done before. Most people were motivated by the desire to do the right thing and to set a good example for their children. They were less motivated by other factors.

  4. Master Environmental Plan: Fort Wingate Depot Activity, Gallup, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Biang, C.A.; Yuen, C.R.; Biang, R.P.; Antonopoulos, A.A.; Ditmars, J.D.

    1990-12-01

    The master environmental plan is based on an environmental assessment of the areas requiring environmental evaluation (AREEs) at Fort Wingate Depot Activity near Gallup, New Mexico. The Fort Wingate Depot Activity is slated for closure under the Base Closure and Realignment Act, Public Law 100--526. The MEP assesses the current status, describes additional data requirements, recommends actions for the sites, and establishes a priority order for actions. The plan was developed so that actions comply with hazardous waste and water quality regulations of the State of New Mexico and applicable federal regulations. It contains a brief history of the site, relevant geological and hydrological information, and a description of the current status for each AREE along with a discussion of the available site-specific data that pertain to existing or potential contamination and the impact on the environment. 35 refs., 27 figs., 23 tabs.

  5. Assessment of DOD Wounded Warrior Matters -- Fort Drum

    Science.gov (United States)

    2011-09-30

    their relation to military duties. The six factors that are evaluated are: physical capacity or stamina , upper extremities, lower extremities...Health Net Federal Services contractor. The Fort Drum MEDDAC Referral Management Office created a “Reports Cell ” which was responsible for obtaining...Care Division had created a CLR/Reports Cell group that focused specifically on obtaining CLRs, inputting them into patients’ AHLTA records and

  6. Thunderstorm and Lightning Studies using the FORTE Optical Lightning System (FORTE/OLS)

    International Nuclear Information System (INIS)

    Argo, P.; Franz, R.; Green, J.; Guillen, J.L.; Jacobson, A.R.; Kirkland, M.; Knox, S.; Spalding, R.; Suszcynsky, D.M.

    1999-01-01

    Preliminary observations of simultaneous RF and optical emissions from lightning as seen by the FORTE spacecraft are presented. RF/optical pairs of waveforms are routinely collected both as individual lightning events and as sequences of events associated with cloud-to-ground (CG) and intra-cloud (IC) flashes. CG pulses can be distinguished from IC pulses based on the properties of the RF and optical waveforms, but mostly based on the associated RF spectrograms. The RF spectrograms are very similar to previous ground-based VHF observations of lightning and show signatures associated with return strokes, stepped and dart leaders, and attachment processes,. RF emissions are observed to precede the arrival of optical emissions at the satellite by a mean value of 280 microseconds. The dual phenomenology nature of these observations are discussed in terms of their ability to contribute to a satellite-based lightning monitoring mission

  7. Thunderstorm and Lightning Studies using the FORTE Optical Lightning System (FORTE/OLS)

    Energy Technology Data Exchange (ETDEWEB)

    Argo, P.; Franz, R.; Green, J.; Guillen, J.L.; Jacobson, A.R.; Kirkland, M.; Knox, S.; Spalding, R.; Suszcynsky, D.M.

    1999-02-01

    Preliminary observations of simultaneous RF and optical emissions from lightning as seen by the FORTE spacecraft are presented. RF/optical pairs of waveforms are routinely collected both as individual lightning events and as sequences of events associated with cloud-to-ground (CG) and intra-cloud (IC) flashes. CG pulses can be distinguished from IC pulses based on the properties of the RF and optical waveforms, but mostly based on the associated RF spectrograms. The RF spectrograms are very similar to previous ground-based VHF observations of lightning and show signatures associated with return strokes, stepped and dart leaders, and attachment processes,. RF emissions are observed to precede the arrival of optical emissions at the satellite by a mean value of 280 microseconds. The dual phenomenology nature of these observations are discussed in terms of their ability to contribute to a satellite-based lightning monitoring mission.

  8. Budget Impact Analysis of Oral Fisiogen Ferro Forte® versus Intravenous Iron for the Management of Iron Deficiency in Chronic Kidney Disease in Spain.

    Science.gov (United States)

    Darbà, Josep; Ascanio, Meritxell

    2018-06-22

    Iron deficiency is a frequent complication of chronic kidney disease (CKD) that is associated with a decrease in the quality of life of patients and an increase in the risk of other clinical complications. Iron therapy represents one of the fundamentals of patients with CKD. Sucrosomial ® oral iron allows Fisiogen Ferro Forte ® to be used in all patients who are intolerant to treatment by the oral route of administration, or who present with malabsorption of conventional oral iron preparations. The main objective of this study was to assess the economic impact of the oral iron Fisiogen Ferro Forte ® for the management of iron deficiency in CKD patients in Spain. A 4-year budget impact model was developed for the period 2017-2020 for CKD patients with iron deficiency who were candidates for intravenous iron due to a lack of response to oral iron, from the perspective of the Spanish healthcare system. Three subgroups of CKD patients were included in the analysis: predialysis, peritoneal dialysis, and post-transplant. The intravenous iron formulations Ferinject ® , Venofer ® , and Feriv ® were considered appropriate comparators to be used in the model. National data on the prevalence of CKD for the three subgroups of patients were obtained from the literature, and input data on drug utilization and outpatient hospitalizations associated with iron administration were obtained by consulting nephrologists. Nephrology experts were also asked about resources used during medical visits and monitoring tests. Based on the unit costs for each iron therapy and the resources used, the total treatment cost per patient associated with each product was obtained to estimate the global budget impact of increasing the use of Fisiogen Ferro Forte ® . The average annual budget savings due to an increase in Fisiogen Ferro Forte ® and a decrease in intravenous iron have been estimated at €398,685, €180,937, and €195,842 over 4 years for the predialysis, peritoneal dialysis

  9. Strategic Energy Management Plan For Fort Buchanan, Puerto Rico

    Energy Technology Data Exchange (ETDEWEB)

    Parker, Steven A.; Hunt, W. D.

    2001-10-31

    This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Strategic Energy Management Plan for the Site. A strategy has been developed with three major elements in mind: 1) development of a strong foundation from which to build, 2) understanding technologies that are available, and 3) exploring financing options to fund the implementation of improvements. The objective of this report is to outline a strategy that can be used by Fort Buchanan to further establish an effective energy management program. Once a strategy is accepted, the next step is to take action. Some of the strategies defined in this Plan may be implemented directly. Other strategies may require the development of a more sophisticated tactical, or operational, plan to detail a roadmap that will lead to successful realization of the goal. Similarly, some strategies are not single events. Rather, some strategies will require continuous efforts to maintain diligence or to change the culture of the Base occupants and their efforts to conserve energy resources.

  10. Site Investigations with the Site Characterization and Analysis Penetrator System at Fort Dix, New Jersey

    Science.gov (United States)

    1993-07-01

    rod system or through a tremie tube ; both procedures were used interchangeably at Fort Dix to demon- strate the efficiency and effectiveness of each...allows delivery through either a l/4-in.-diam grout tube or a 3/8-in.-diam rout tube . The grout used at Fort Dix consisted of a mixture of water and... microfine , blended Portland cement (Lehigh Geocem’, Leeds, Alabama). The grout is a suspension of a uniformly produced cement clinker interground with

  11. Fort Lewis natural gas and fuel oil energy baseline and efficiency resource assessment

    International Nuclear Information System (INIS)

    Brodrick, J.R.; Daellenbach, K.K.; Parker, G.B.; Richman, E.E.; Secrest, T.J.; Shankle, S.A.

    1993-02-01

    The mission of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) is to lead the improvement of energy efficiency and fuel flexibility within the federal sector. Through the Pacific Northwest Laboratory (PNL), FEMP is developing a fuel-neutral approach for identifying, evaluating, and acquiring all cost-effective energy projects at federal installations; this procedure is entitled the Federal Energy Decision Screening (FEDS) system. Through a cooperative program between FEMP and the Army Forces Command (FORSCOM) for providing technical assistance to FORSCOM installations, PNL has been working with the Fort Lewis Army installation to develop the FEDS procedure. The natural gas and fuel oil assessment contained in this report was preceded with an assessment of electric energy usage that was used to implement a cofunded program between Fort Lewis and Tacoma Public Utilities to improve the efficiency of the Fort's electric-energy-using systems. This report extends the assessment procedure to the systems using natural gas and fuel oil to provide a baseline of consumption and an estimate of the energy-efficiency potential that exists for these two fuel types at Fort Lewis. The baseline is essential to segment the end uses that are targets for broad-based efficiency improvement programs. The estimated fossil-fuel efficiency resources are estimates of the available quantities of conservation for natural gas, fuel oils number-sign 2 and number-sign 6, and fuel-switching opportunities by level of cost-effectiveness. The intent of the baseline and efficiency resource estimates is to identify the major efficiency resource opportunities and not to identify all possible opportunities; however, areas of additional opportunity are noted to encourage further effort

  12. Inpatient Behavioral Health Recapture A Busiess Case Analysis at Evans Army Community Hospital Fort Carson, Colorado

    Science.gov (United States)

    2009-07-20

    and Obstetrics /Gynecology. Inpatient care includes Obstetrics , Intensive Care, and Post Anesthesia Care/Same Day Surgery. EACH Mission: Delivering...charged with murder in Iraq shooting deaths, 2009). EACH Inpt Psych 13 Fort Carson has not been immune to the increase in suicides and violence among...to identify Soldiers with PTSD symptoms. In 2008, however, attention returned to Fort Carson as a number of local homicides and other violence tied

  13. Leaktightness in HTGRs - experience at Fort St. Vrain

    International Nuclear Information System (INIS)

    Neylan, A.J.; Barker, R.A.; Deardorff, A.F.

    1976-01-01

    The Fort St. Vrain Prestressed Concrete Reactor Vessel is the first utilized to contain the helium coolant of a High Temperature Gas-Cooled Reactor. Because the helium coolant contains fission products, leakage from the vessel is limited to 15 percent of vessel inventory per year. This paper describes the fabrication methods and development tests used to assure this leaktightness and the leakage test conducted to verify it. (author)

  14. The health of loblolly pine stands at Fort Benning, GA

    Science.gov (United States)

    Soung-Ryoul Ryu; G. Geoff Wang; Joan L. Walker

    2013-01-01

    Approximately two-thirds of the red-cockaded woodpecker (Picoides borealis) (RCW) groups at Fort Benning, GA, depend on loblolly pine (Pinus taeda) stands for nesting or foraging. However, loblolly pine stands are suspected to decline. Forest managers want to replace loblolly pine with longleaf pine (P. palustris...

  15. 77 FR 57112 - Notice of Inventory Completion: U.S. Department of Defense, Army, Fort Sill Museum, Lawton, OK

    Science.gov (United States)

    2012-09-17

    ... Landmark and Museum, U.S. Army Fires Center of Excellence, Fort Sill, OK 73503, telephone (580) 442-6570... trapping, 3 metal rings, 2 metal rivets, 17 metal nails, 53 metal bracelets, 1 metal pail, 1,500 glass... A. Neel, Director, Fort Sill National Historic Landmark and Museum, U.S. Army Fires Center of...

  16. Informal report on measurements of slant TEC by FORTE

    International Nuclear Information System (INIS)

    Massey, R.S.

    1997-01-01

    Los Alamos National Laboratory's Space and Atmospheric Sciences group is now operating the FORTE satellite, which has two sets of instruments: optical detectors and radio detectors. In this report the author describes work with one set of radio detectors that allow measurements of the total electron content (TEC) traversed by VHF radiation originating at an electromagnetic pulse (EMP) generator located at Los Alamos

  17. Assessment of DoD Wounded Warrior Matters -- Fort Riley

    Science.gov (United States)

    2013-08-06

    acceptable excuses included At Remote Care, Regular Leave, Maternity and Paternity Leave, Terminal Leave, Permanent Change of Station, and Transferred to...risk of negative medication interactions and reactions for Soldiers assigned to the Fort Riley WTB. B.2. Background The Joint Commission, an...reconciliation is to minimize medication errors such as omissions, duplications, dosing errors, and drug interactions . Medical reconciliation should

  18. Eyes Behind the Lines: US Army Long-Range Reconnaissance and Surveillance Units

    Science.gov (United States)

    2005-01-01

    while still at Fort Campbell, Ken - tucky, converted its divisional Recondo School into a provisional LRRP unit in the summer of 967, before the...helicopter rather than a Hughes OH-6A light observa- tion helicopter (LOH, but commonly called “ loach ”), which had a crew of two (pilot and observer

  19. Tile forts of the Liesbeeck Frontier | Sleigh | Scientia Militaria: South ...

    African Journals Online (AJOL)

    Scientia Militaria: South African Journal of Military Studies. Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue · Archives · Journal Home > Vol 27 (1997) >. Log in or Register to get access to full text downloads. Username, Password, Remember me, or Register. Tile forts of the Liesbeeck Frontier.

  20. 77 FR 24579 - Establishment of the Fort Ord National Monument

    Science.gov (United States)

    2012-04-25

    ... 1775-1776, Anza established the first overland route from ``New Spain,'' as Mexico was then known, to..., approximately 6 miles of which pass through the Fort Ord area. Although much of the historic route currently... tourists and recreationalists from near and far, and enhance its unique natural resources, for the...

  1. The Forte Kreis : an Attempt to Spiritual Leadership over Europe

    NARCIS (Netherlands)

    Poorthuis, Marcel

    2017-01-01

    Just before the outbreak of World War 1, a group of writers, artists and philosophers decided to establish a spiritual rule over Europe, the Forte Kreis. The group aimed at a reconciliation in Europe, by establishing pacifism, but also between East and West by creating a new language. Their thoughts

  2. 5 CFR Appendix A to Part 581 - List of Agents Designated To Accept Legal Process

    Science.gov (United States)

    2010-01-01

    ... REGULATIONS PROCESSING GARNISHMENT ORDERS FOR CHILD SUPPORT AND/OR ALIMONY Pt. 581, App. A Appendix A to Part... Supervisor, 1969 So. Sheridan Ave., Sheridan, WY 82801, (307) 672-0751 Medicine Bow—Forest Supervisor, 2468...

  3. 22nd Spring Research Festival Showcases Fort Detrick Science | Poster

    Science.gov (United States)

    Rainy weather couldn’t dampen the spirits of visitors to the 2018 Spring Research Festival, which brought together scientists from the Frederick National Laboratory (FNL), NCI at Frederick, and the U.S. Army Medical Research and Materiel Command (USAMRMC) and showcased the important research that takes place every day at Fort Detrick.

  4. Fort Valley studies: A natural laboratory for research and education

    Science.gov (United States)

    Brian W. Geils

    2008-01-01

    Drought, wildfire, extinction, and invasive species are considered serious threats to the health of our forests. Although these issues have global connections, we most readily see their consequences locally and attempt to respond with management based on science. For 100 years, the Fort Valley Experimental Forest (FVEF) has provided educational and experimental support...

  5. Assessment of effects of Fort St. Vrain HTGR primary coolant on Alloy 800. Final report

    International Nuclear Information System (INIS)

    Trester, P.W.; Johnson, W.R.; Simnad, M.T.; Burnette, R.D.; Roberts, D.I.

    1982-08-01

    A comprehensive review was conducted of primary helium coolant chemistry data, based on current and past operating histories of helium-cooled, high-temperature reactors (HTGRs), including the Fort St. Vrain (FSV) HTGR. A reference observed FSV reactor coolant environment was identified. Further, a slightly drier expected FSV coolant chemistry was predicted for reactor operation at 100% of full power. The expected environment was compared with helium test environments used in the US, United Kingdom, Germany, France, and Japan. Based on a comprehensive review and analysis of mechanical property data reported for Alloy 800 tested in controlled-impurity helium environments (and in air when appropriate for comparison), an assessment was made of the effect of FSV expected helium chemistry on material properties of alloy 800, with emphasis on design properties of the Alloy 800 material utilized in the FSV steam generators

  6. How confident is Fort McKay that industry can reclaim oil sand development

    Energy Technology Data Exchange (ETDEWEB)

    Fitzpatrick, C. [Fort McKay First Nations, AB (Canada)

    2004-02-05

    This presentation described how traditional environmental knowledge (TEK) can provide valuable information for both the reclamation design and assessment of oil sand development in Fort McKay. Conservation is valued by the Fort McKay First Nations communities who claim that current reclamation methods are too slow, and that the land is not being brought back to its original use with the uniqueness of the boreal landscape. Elders have noted that each year the water level in the Athabasca River is lower. The blowing tailings and coke dust are causing trees to dye and driving animals away. There is concern that the animals that remain may not be safe to eat. The Fort McKay First Nation community has stated that it will view reclamation as a success only when it functions with proof over many generations. The major concerns include: salt in the water draining from reclaimed areas; salt in the soils of reclaimed area; muskeg cannot be recreated; and, the issue of whether cranberry, blueberry and streambank forest areas can be recreated, along with traditional medicinal plants. Other concerns include the loss of rivers such as the Beaver Creek and Tar River, and that the water in reclaimed areas may not be suitable for animals to live in or to drink. tabs., figs.

  7. How confident is Fort McKay that industry can reclaim oil sand development

    International Nuclear Information System (INIS)

    Fitzpatrick, C.

    2004-01-01

    This presentation described how traditional environmental knowledge (TEK) can provide valuable information for both the reclamation design and assessment of oil sand development in Fort McKay. Conservation is valued by the Fort McKay First Nations communities who claim that current reclamation methods are too slow, and that the land is not being brought back to its original use with the uniqueness of the boreal landscape. Elders have noted that each year the water level in the Athabasca River is lower. The blowing tailings and coke dust are causing trees to dye and driving animals away. There is concern that the animals that remain may not be safe to eat. The Fort McKay First Nation community has stated that it will view reclamation as a success only when it functions with proof over many generations. The major concerns include: salt in the water draining from reclaimed areas; salt in the soils of reclaimed area; muskeg cannot be recreated; and, the issue of whether cranberry, blueberry and streambank forest areas can be recreated, along with traditional medicinal plants. Other concerns include the loss of rivers such as the Beaver Creek and Tar River, and that the water in reclaimed areas may not be suitable for animals to live in or to drink. tabs., figs

  8. The Fort McMurray Demonstration Project in Social Marketing: theory, design, and evaluation.

    Science.gov (United States)

    Guidotti, T L; Ford, L; Wheeler, M

    2000-02-01

    The Fort McMurray Demonstration Project in Social Marketing is a multifaceted program that applies the techniques of social marketing to health and safety. This paper describes the origins of the project and the principles on which it was based. VENUE: Fort McMurray, in the province of Alberta, Canada, was selected because the community had several community initiatives already underway and the project had the opportunity to demonstrate "value added." The project is distinguished from others by a model that attempts to achieve mutually reinforcing effects from social marketing in the community as a whole and from workplace safety promotion in particular. Specific interventions sponsored by the project include a media campaign on cable television, public activities in local schools, a community safety audit, and media appearance by a mascot that provides visual identity to the project, a dinosaur named "Safetysaurus." The project integrated its activities with other community initiatives. The evaluation component emphasizes outcome measures. A final evaluation based on injury rates and attitudinal surveys is underway. Baseline data from the first round of surveys have been compiled and published. In 1995, Fort McMurray became the first city in North America to be given membership in the World Health Organization's Safe Community Network.

  9. Water quality and hydrology in the Fort Belvoir area, Virginia, 1954-55

    Science.gov (United States)

    Durfor, Charles N.

    1961-01-01

    This report summarizes the results of an investigation of water quality and hydrology in the Fort Belvoir, Va., area for the period August 1954 to September 1955. It summarizes and evaluates information about the water resources of this area that are pertinent to the choice of location and operation of an Army nuclear power reactor. The quantity, quality, nature, and use of the local water that might be affected by the location and operation of a reactor in the area were subjects of investigation. Variations in the quality of the water caused by variation in streamflow, tidal effects, and pollution were important facets of the investigation. During extended periods of low streamflow in the Potomac River (usually in the late summer months), salty water moves upstream from Chesapeake Bay and increases the dissolved solids content of the surface waters adjacent to Fort Belvoir. When the streamflow is low the concentration of dissolved solids in the water near the river bottom exceeds that near the surface. The waters in Gunston Cove usually contain more dissolved oxygen than those in the Potomac River. During the summer, the content of dissolved oxygen in the cove waters frequently exceeds 100 percent of saturation. Surface floats that were released on a flood tide in Gunston Cove moved toward the inner portion of the cove in the same direction as the wind and the tide. The maximum average velocity of these floats was 0.65 feet per second. On an ebb tide, many surface floats that were released in Gunston Cove moved toward the inner portion of the cove in the direction of the wind, in opposition to the direction of the tidal movement. Floats released near the mouth of the cove on the same tide, moved with the tide out of the cove through a narrow pass at the end of a submerged sandbar extending from the Fort Belvoir shoreline. The maximum average velocity of the floats in the pass on this ebb tide was 0.85 feet per second. Measurements of subsurface flow direction

  10. 2009 Federal Emergency Management Agency (FEMA) Topographic LiDAR: Fort Kent, Maine

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Camp Dresser McKee Inc. contracted with Sanborn Map Company to provide LiDAR mapping services for Fort Kent, Maine. Utilizing multi-return systems, Light Detection...

  11. Bastion on the Border: Fort Bliss, 1854-1943

    Science.gov (United States)

    1993-01-01

    Journals , Record Group (RG) 165, Records of the War Department General and Special Staffs, National Archives, Washington, D.C. "’Richard Estrada, Border...it was the Fort Bliss garrison and the other troops deployed by Steever in the El Paso Patrol District that would have to provide the figurative glue ...little military value. For example, on March 30 three carloads of oats, flour , corn, and hay were dispatched; on April 7 fourteen carloads of hay, gasoline

  12. 76 FR 77684 - Establishment of the Fort Ross-Seaview Viticultural Area

    Science.gov (United States)

    2011-12-14

    ...; Treasury decision. SUMMARY: This Treasury decision establishes the 27,500-acre ``Fort Ross-Seaview... may purchase. DATES: Effective Date: January 13, 2012. FOR FURTHER INFORMATION CONTACT: Elisabeth C... may purchase. Establishment of a viticultural area is neither an approval nor an endorsement by TTB of...

  13. Dimensions of Velopharyngeal Space following Maxillary Advancement with Le Fort I Osteotomy Compared to Zisser Segmental Osteotomy: A Cephalometric Study

    Directory of Open Access Journals (Sweden)

    Furkan Erol Karabekmez

    2015-01-01

    Full Text Available The objectives of this study are to assess the velopharyngeal dimensions using cephalometric variables of the nasopharynx and oropharynx as well as to compare the Le Fort I osteotomy technique to Zisser’s anterior maxillary osteotomy technique based on patients’ outcomes within early and late postoperative follow-ups. 15 patients with severe maxillary deficiency treated with Le Fort I osteotomy and maxillary segmental osteotomy were assessed. Preoperative, early postoperative, and late postoperative follow-up lateral cephalograms, patient histories, and operative reports are reviewed with a focus on defined cephalometric landmarks for assessing velopharyngeal space dimension and maxillary movement (measured for three different tracing points. A significant change was found between preoperative and postoperative lateral cephalometric measurements regarding the distance between the posterior nasal spine and the posterior pharyngeal wall in Le Fort I osteotomy cases. However, no significant difference was found between preoperative and postoperative measurements in maxillary segmental osteotomy cases regarding the same measurements. The velopharyngeal area calculated for the Le Fort I osteotomy group showed a significant difference between the preoperative and postoperative measurements. Le Fort I osteotomy for advancement of upper jaw increases velopharyngeal space. On the other hand, Zisser’s anterior maxillary segmental osteotomy does not alter the dimension of the velopharyngeal space significantly.

  14. Opening remarks for the Fort Valley Centennial Celebration (P-53)

    Science.gov (United States)

    G. Sam Foster

    2008-01-01

    The Rocky Mountain Research Station recognizes and values the contributions of our scientists and collaborators for their work over the past century at Fort Valley Experimental Forest. With the help of our partners and collaborators, Rocky Mountain Research Station is working to improve coordination across its research Program Areas and Experimental Forests and Ranges...

  15. Field Demonstration of Aviation Turbine Fuel MIL-T-83133C, Grade JP-8 (NATO Code F-34), at Fort Bliss, TX

    Science.gov (United States)

    1992-09-01

    APO NY 09052 CDR US ARMY NATICK RD&E CTR DOD PROJ MGR, MOBILE ELECTRIC POWER ATTN: SATNC-US US ARMY TROOP SUPPORT COMMAND NATICK MA 01760-5020 ATUN ...US ARMY QUARTERMASTER SCHOOL ATUN : LOEA-PL (MR LeVAN) I ATTN: ATSM-CDM 1 NEW CUMBERLAND PA 17070 ATSM-PWD I FORT LEE VA 23801 PETROLEUM FIELD OFFICE...ARTILLERY CENTER US ARMY INFANTRY SCHOOL & FORT BLISS ATTN: ATSH-CD-MIS-M I ATUN : ATZC-ISL-PP 3 ATSH-CD-TSM-T 1 ATZC-ISL-MM 3 FORT BENNING GA 31905-5400

  16. ORNL's NRC-sponsored HTGR safety and licensing analysis activities for Fort St. Vrain and advanced reactors

    International Nuclear Information System (INIS)

    Ball, S.J.; Cleveland, J.C.; Harrington, R.M.

    1985-01-01

    The ORNL safety analysis program for the HTGR was established in 1974 to provide technical assistance to the USNRC on licensing questions for both Fort St. Vrain and advanced plant concepts. The emphasis has been on development of major component and system dynamic simulation codes, and use of these codes to analyze specific licensing-related scenarios. The program has also emphasized code verification, using Fort St. Vrain data where applicable, and comparing results with industry-generated codes. By the use of model and parameter adjustment routines, safety-significant uncertainties have been identified. A major part of the analysis work has been done for the Fort St. Vrain HTGR, and has included analyses of FSAR accident scenario re-evaluations, the core block oscillation problem, core support thermal stress questions, technical specification upgrade review, and TMI action plan applicability studies. The large, 2240-MW(t) cogeneration lead plant design was analyzed in a multi-laboratory cooperative effort to estimate fission product source terms from postulated severe accidents

  17. Operational experience at Fort St. Vrain

    International Nuclear Information System (INIS)

    Bramblett, G.C.; Fisher, C.R.; Swart, F.E.

    1981-01-01

    The Fort St. Vrain (FSV) station, a 330-MW(e) single reheat steam cycle powered by a high-temperature gas-cooled reactor (HTGR), is the first HTGR to enter commercial operation. Designed and built by General Atomic Company (GA), the plant is owned and operated by Public Service Company of Colorado (PSC). Many unique design features have been incorporated into this reactor system, including high-pressure helium as the primary system coolant, a graphite-moderated prismatic block core design, fission-product-containing carbide coatings on both fissile and fertile fuel particles, steam-driven helium circulators turning on water bearings, and once-through steam generators. All of these systems are contained in a prestressed concrete reactor vessel (PCRV). Extensive testing has been conducted during the rise to power following first criticality early in 1974 to verify system design performance. During this period, the plant has operated at power levels up to 70% and produced over one billion kilowatt hours of electricity. In 1979, the first refueling was conducted in conjunction with an extensive in-core inspection, the addition of in-core instrumentation, and a planned removal of a circulator for inspection. Later in the year, a scheduled shutdown was undertaken for surveillance tests, insertion of core region constraint devices (RCDs), and other maintenance. Fort St. Vrain has encountered problems of the type that would be expected in a first-of-a-kind system. The plant is currently restricted to 70% of design power by the Nuclear Regulatory Commission (NRC) pending resolution of the core region gas outlet temperature fluctuation problem. Even so, the basic performance of the HTGR concept and all of the unique design features have been successfully demonstrated. The system has been characterized by low personnel radiation exposures, operational flexibility, and long time afforded for status evaluation and response. (author)

  18. Retention Patterns for Army National Guard Units Attending the National Training Center

    Science.gov (United States)

    1988-04-01

    which are more difficult, Table 2.1 NTC ROUNDOUT BATTALION SCHEDULE ARNG UNIT STATE DATES 1-108 AR GA 9-22 September 󈨗 2-136 INF (M) MN 19 April-8 May...1984 1-121 INF (M) GA 3-22 October 󈨘 2-121 INF (M) GA 18 March-6 April 󈨙 2-152 AR AL 1-20 June 󈨙 2-120 INF (M) NC 26 June-15 July 󈨙 3-156 INF...roundout unit to the 24th Infantry Division headquartered at Fort Stewart, Georgia. Elements of the unit are located in Tifton , Valdosta, Fitzgerald and

  19. Automated Environmental Data Collection at Fort Benning, Georgia, from May 1999 to July 2001

    National Research Council Canada - National Science Library

    Hahn, Charles

    2002-01-01

    The Department of Defense, Strategic Environmental Research and Development Program, Ecosystem Management Project, Ecosystem Characterization and Monitoring initiative Program at Fort Benning, Georgia...

  20. Archaeological Surveys and Evaluations of Four Construction Areas in the Vicinity of Fort Jackson, Plaquemines Parish, Louisiana

    Science.gov (United States)

    1992-04-01

    the officers’ quarters, a hospital, and an inspector’s quarters (Greene 1982:128-129). The fort itself was a regular pentagon with bastions at each...Outside of the moat another brick wall was constructed, facing a second ditch. A bridge over the second ditch led southward to a water battery whose...Archaeological Swrveys and Evaluations at Fort Jackson du Pratz, Le Page 1975 The History of Louisiana. Louisiana American Revolution Bicentennial Commission

  1. DIGITAL PRESERVATION OF THE QUON SANG LUNG LAUNDRY BUILDING, FORT MACLEOD, ALBERTA

    Directory of Open Access Journals (Sweden)

    P. Dawson

    2017-08-01

    Full Text Available This paper describes the results of an emergency recording and archiving of a historic structure in Southern Alberta and explores the lessons learned. Digital recording of the Quon Sang Lung Laundry building in Fort Macleod, Alberta, was a joint initiative between Alberta Culture and Tourism and the University of Calgary. The Quon Sang Lung Laundry was a boomtown-style wood structure situated in the Fort Macleod Provincial Historic Area, Alberta. Built in the mid-1800s, the structure was one of the four buildings comprising Fort Macleod’s Chinatown. Its association with Chinese immigration, settlement, and emergence of Chinese-owned businesses in early twentieth-century Alberta, made the Quon Sang Lung Laundry a unique and very significant historic resource. In recent years, a condition assessment of the structure indicated that the building was not safe and that the extent of the instability could lead to a sudden collapse. In response, Alberta Culture and Tourism engaged the Departments of Anthropology and Archaeology and Geomatics Engineering from the University of Calgary, to digitally preserve the laundry building. A complete survey including the laser scanning of all the remaining elements of the original structure, was undertaken. Through digital modeling, the work guarantees that a three-dimensional representation of the building is available for future use. This includes accurate 3D renders of the exterior and interior spaces and a collection of architectural drawings comprising floor plans, sections, and elevations.

  2. Le Fort III Distraction With Internal vs External Distractors: A Cephalometric Analysis.

    Science.gov (United States)

    Robertson, Kevin J; Mendez, Bernardino M; Bruce, William J; McDonnell, Brendan D; Chiodo, Michael V; Patel, Parit A

    2018-05-01

    This study compares the change in midface position following Le Fort III advancement using either rigid external distraction (group 1) or internal distraction (group 2). We hypothesized that, with reference to right-facing cephalometry, internal distraction would result in increased clockwise rotation and inferior displacement of the midface. Le Fort III osteotomies and standardized distraction protocols were performed on 10 cadaveric specimens per group. Right-facing lateral cephalograms were traced and compared across time points to determine change in position at points orbitale, anterior nasal spine (ANS), A-point, and angle ANB. Institutional. Twenty cadaveric head specimens. Standard subcranial Le Fort III osteotomies were performed from a coronal approach and adequately mobilized. The specified distraction mechanism was applied and advanced by 15 mm. Changes of position were calculated at various skeletal landmarks: orbitale, ANS, A-point, and ANB. Group 1 demonstrated relatively uniform x-axis advancement with minimal inferior repositioning at the A-point, ANS, and orbitale. Group 2 demonstrated marked variation in x-axis advancement among the 3 points, along with a significant inferior repositioning and clockwise rotation of the midface ( P External distraction resulted in more uniform advancement of the midface, whereas internal distraction resulted in greater clockwise rotation and inferior displacement. External distraction appears to provide increased vector control of the midface, which is important in creating a customized distraction plan based on the patient's individual occlusal and skeletal needs.

  3. Digital Preservation of the Quon Sang Lung Laundry Building, Fort Macleod, Alberta

    Science.gov (United States)

    Dawson, P.; Baradaran, F.; Jahraus, A.; Rubalcava, E.; Farrokhi, A.; Robinson, C.

    2017-08-01

    This paper describes the results of an emergency recording and archiving of a historic structure in Southern Alberta and explores the lessons learned. Digital recording of the Quon Sang Lung Laundry building in Fort Macleod, Alberta, was a joint initiative between Alberta Culture and Tourism and the University of Calgary. The Quon Sang Lung Laundry was a boomtown-style wood structure situated in the Fort Macleod Provincial Historic Area, Alberta. Built in the mid-1800s, the structure was one of the four buildings comprising Fort Macleod's Chinatown. Its association with Chinese immigration, settlement, and emergence of Chinese-owned businesses in early twentieth-century Alberta, made the Quon Sang Lung Laundry a unique and very significant historic resource. In recent years, a condition assessment of the structure indicated that the building was not safe and that the extent of the instability could lead to a sudden collapse. In response, Alberta Culture and Tourism engaged the Departments of Anthropology and Archaeology and Geomatics Engineering from the University of Calgary, to digitally preserve the laundry building. A complete survey including the laser scanning of all the remaining elements of the original structure, was undertaken. Through digital modeling, the work guarantees that a three-dimensional representation of the building is available for future use. This includes accurate 3D renders of the exterior and interior spaces and a collection of architectural drawings comprising floor plans, sections, and elevations.

  4. Safety and licensing analyses for the Fort St. Vrain HTGR

    International Nuclear Information System (INIS)

    Ball, S.J.; Conklin, J.C.; Harrington, R.M.; Cleveland, J.C.; Clapp, N.E. Jr.

    1982-01-01

    The Oak Ridge National Laboratory (ORNL) safety analysis program for the HTGR includes development and verification of system response simulation codes, and applications of these codes to specific Fort St. Vrain reactor licensing problems. Licensing studies addressed the oscillation problems and the concerns about large thermal stresses in the core support blocks during a postulated accident

  5. Early thinning experiments established by the Fort Valley Experimental Forest

    Science.gov (United States)

    Benjamin P. De Blois; Alex. J. Finkral; Andrew J. Sanchez Meador; Margaret M. Moore

    2008-01-01

    Between 1925 and 1936, the Fort Valley Experimental Forest (FVEF) scientists initiated a study to examine a series of forest thinning experiments in second growth ponderosa pine stands in Arizona and New Mexico. These early thinning plots furnished much of the early background for the development of methods used in forest management in the Southwest. The plots ranged...

  6. 78 FR 32699 - Notice of Intent To Rule on Request to Release Airport Property at the Fort Worth Spinks Airport...

    Science.gov (United States)

    2013-05-31

    ... to Release Airport Property at the Fort Worth Spinks Airport, Fort Worth, Texas AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of request to release airport property. SUMMARY: The FAA... the provisions of Section 125 of the Wendell H. Ford Aviation Investment Reform Act for the 21st...

  7. Feasibility Study for an Off-Post, Primary Care Clinic at Fort Campbell, Kentucky

    National Research Council Canada - National Science Library

    Kvalevog, Kristen J

    2005-01-01

    .... Over 90,679 beneficiaries currently live in -the-Fort Campbell-catchment area and receive primary care at Blanchfield Army Community Hospital through the Red, White, Blue, Gold, and Young Eagle Clinics...

  8. 78 FR 3479 - Notice of Public Meeting of Fort Scott Council

    Science.gov (United States)

    2013-01-16

    ... submitted on cards that will be provided at the meeting, via mail to Laurie Fox, Presidio Trust, 103... stated prominently at the beginning of the comments. The Trust will make available for public inspection... PRESIDIO TRUST Notice of Public Meeting of Fort Scott Council AGENCY: The Presidio Trust. ACTION...

  9. Fort Hills Oil Sands Project No Net Loss Lake earthfill structure

    Energy Technology Data Exchange (ETDEWEB)

    Blakely, D.; Sawatsky, L. [Golder Associates Ltd., Calgary, AB (Canada); Wog, K.; Paz, S. [Alberta Environment, Edmonton, AB (Canada). Water Management Operations; Chernys, S. [Petro-Canada, Calgary, AB (Canada)

    2007-07-01

    The Fort Hills Oil Sands Project (FHOSP) is located north of Fort McMurray, Alberta. The Fort Hills Energy Corporation (FHEC) must compensate for fish habitat lost as a result of mine development that would disturb natural streams and lakes. FHEC planned to construct a fisheries compensation lake on the north end of its leased property, contained in part by an earthfill structure. Unlike most dam structures, the FHOSP No Net Loss Lake (NNLL) earthfill structure was planned solely for the creation of fisheries compensation habitat. Therefore, the NNLL earthfill structure must be designed with robust features that can handle any foreseeable environmental condition without failure, so that it may be accepted as a sustainable feature of the mine closure landscape. This paper discussed the design features of the NNLL earthfill structure. The paper presented information on the background of the project including regulatory criteria for the fisheries compensation habitat; fisheries compensation habitat location; and design criteria for the NNLL. The features of the NNLL earthfill structure were also discussed. In addition, the paper outlined the dam safety classification for earthfill structure and anticipated system performance. The proposed monitoring program and permanent closure plans were also discussed. It was concluded that the earthfill structure was designed with several features that would allow it to become a part of the closure landscape. These included a high width to height ratio, significant erosion protection, and an aggressive reclamation plan. These features will provide a sound basis for FHEC to apply for a reclamation certificate at the end of mine life. 3 refs., 3 tabs., 8 figs.

  10. Fort Hood Building and Landscape Inventory with WWII and Cold War Context

    Science.gov (United States)

    2007-03-01

    barracks, 1970s (NARA)........................................................... 112 Figure 37. Palmer Movie Theater (NARA...revised 1953) showing layout of Hood Village and trailer park (Fort Hood...arms ammunition storage building #92012 (ERDC-CERL, 2004). ......... 260 Figure 163: Radio reception building #92063 (ERDC-CERL, 2004

  11. Fort St. Vrain decommissioning project

    International Nuclear Information System (INIS)

    Fisher, M.

    1998-01-01

    Public Service Company of Colorado (PSCo), owner of the Fort St. Vrain nuclear generating station, achieved its final decommissioning goal on August 5, 1997 when the Nuclear Regulatory Commission terminated the Part 50 reactor license. PSCo pioneered and completed the world's first successful decommissioning of a commercial nuclear power plant after many years of operation. In August 1989, PSCo decided to permanently shutdown the reactor and proceed with its decommissioning. The decision to proceed with early dismantlement as the appropriate decommissioning method proved wise for all stake holders - present and future - by mitigating potential environmental impacts and reducing financial risks to company shareholders, customers, employees, neighboring communities and regulators. We believe that PSCo's decommissioning process set an exemplary standard for the world's nuclear industry and provided leadership, innovation, advancement and distinguished contributions to other decommissioning efforts throughout the world. (author)

  12. Military Bases: Opportunities Exist to Improve Future Base Realignment and Closure Rounds

    Science.gov (United States)

    2013-03-01

    Operational Army—realigns Fort Bliss , TX; Fort Hood, TX; Fort Riley, KS; Fort Campbell, KY; and Fort Sill, OK to include rebasing of units from overseas to...Committee on Appropriations United States Senate The Honorable Tim Johnson Chairman The Honorable Mark Kirk Ranking Member Subcommittee on Military

  13. Vendor Payments-Operation Mongoose, Fort Belvoir Defense Accounting Office and Rome Operating Location

    National Research Council Canada - National Science Library

    Lane, F

    1996-01-01

    .... Due to the impending closure of the Defense Accounting Office at Fort Belvoir and the anticipated consolidation to the Rome Operating Location, New York, we did not perform a review of the management...

  14. Fort Carson Building 1860 Biomass Heating Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    Hunsberger, Randolph [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tomberlin, Gregg [National Renewable Energy Lab. (NREL), Golden, CO (United States); Gaul, Chris [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    As part of the Army Net-Zero Energy Installation program, the Fort Carson Army Base requested that NREL evaluate the feasibility of adding a biomass boiler to the district heating system served by Building 1860. We have also developed an Excel-spreadsheet-based decision support tool--specific to the historic loads served by Building 1860--with which users can perform what-if analysis on gas costs, biomass costs, and other parameters. For economic reasons, we do not recommend adding a biomass system at this time.

  15. Basewide Energy Study, Fort Wainwright Alaska: Volume 1-Executive Summary

    Science.gov (United States)

    1982-04-01

    more accurate condensate wiett?Ing. 2.2 ENERGY OSAGE ANALISIS 4 top~down anay2ts was mad" of FY’•0 ener;’ uxage’ t Fort wrtsvrigFnt. The spporiIonments...vice, at each receptacle cluster . It should be thermally sensitlve. rtdtcing through-put from 600 watts at -SOOT to0soer power at 100? outside air

  16. Flood-inundation maps for the St. Marys River at Fort Wayne, Indiana

    Science.gov (United States)

    Menke, Chad D.; Kim, Moon H.; Fowler, Kathleen K.

    2012-01-01

    Digital flood-inundation maps for a 9-mile reach of the St. Marys River that extends from South Anthony Boulevard to Main Street at Fort Wayne, Indiana, were created by the U.S. Geological Survey (USGS) in cooperation with the City of Fort Wayne. The inundation maps, which can be accessed through the USGS Flood Inundation Mapping Science Web site, depict estimates of the areal extent of flooding corresponding to selected water levels (stages) at the USGS streamgage 04182000 St. Marys River near Fort Wayne, Ind. Current conditions at the USGS streamgages in Indiana may be obtained from the National Water Information System: Web Interface. In addition, the information has been provided to the National Weather Service (NWS) for incorporation into their Advanced Hydrologic Prediction Service (AHPS) flood warning system. The NWS forecasts flood hydrographs at many places that are often collocated at USGS streamgages. That forecasted peak-stage information, also available on the Internet, may be used in conjunction with the maps developed in this study to show predicted areas of flood inundation. In this study, water-surface profiles were simulated for the stream reach by means of a hydraulic one-dimensional step-backwater model. The model was calibrated using the most current stage-discharge relation at the USGS streamgage 04182000 St. Marys River near Fort Wayne, Ind. The hydraulic model was then used to simulate 11 water-surface profiles for flood stages at 1-ft intervals referenced to the streamgage datum and ranging from bankfull to approximately the highest recorded water level at the streamgage. The simulated water-surface profiles were then combined with a geographic information system digital elevation model (derived from Light Detection and Ranging (LiDAR) data) in order to delineate the area flooded at each water level. A flood inundation map was generated for each water-surface profile stage (11 maps in all) so that for any given flood stage users will be

  17. Fort St. Vrain improvement program plan. Draft final report

    International Nuclear Information System (INIS)

    1980-03-01

    The restraints are described which inhibit the Fort St. Vrain (FSV) Nuclear Power Station, a high temperature gas cooled reactor (HTGR) plant, from achieving full power operation with high availability. The actions necessary to overcome these restraints are outlined. The restraints originated from problems in both hardware related and institutional areas. The report summarizes what has been accomplished, what is currently being done, and what should be done to resolve the problems

  18. Management of Groin Abcess with Flaminal Forte and KerraMax Care

    Directory of Open Access Journals (Sweden)

    Maggie Pugh

    2016-04-01

    Full Text Available The patient’s dressing plan using Flaminal Forte and KerraMax Care successfully managed the complexities of his wound, absorbing exudate, reducing pain on dressing, malodour and wound bioburden. Moreover, the plan encouraged patient concordance, reduced nursing consultation time and subsequently altered treatment plans for our patients with abscesses

  19. Gynecologic Malignancies Post-LeFort Colpocleisis

    Directory of Open Access Journals (Sweden)

    Rayan Elkattah

    2014-01-01

    Full Text Available Introduction. LeFort colpocleisis (LFC is a safe and effective obliterative surgical option for older women with advanced pelvic organ prolapse who no longer desire coital activity. A major disadvantage is the limited ability to evaluate for post-LFC gynecologic malignancies. Methods. We present the first case of endometrioid ovarian cancer diagnosed after LFC and review all reported gynecologic malignancies post-LFC in the English medical literature. Results. This is the second reported ovarian cancer post-LFC and the first of the endometrioid subtype. A total of nine other gynecologic malignancies post-LFC have been reported in the English medical literature. Conclusions. Gynecologic malignancies post-LFC are rare. We propose a simple 3-step strategy in evaluating post-LFC malignancies.

  20. A Case Analysis of Energy Savings Performance Contract Projects and Photovoltaic Energy at Fort Bliss, El Paso, Texas

    Science.gov (United States)

    2006-06-01

    PHOTOVOLTAIC ENERGY AND FORT BLISS CASE BACKGROUND A. PHOTOVOLTAIC ENERGY The use of photovoltaic power systems is nothing new in the Department...against the Outback MPPT charge controller . This test will be done over a one month timeframe. The Arizona Power ISG test plan is contained in...cost-benefit analysis of conventional power versus emerging photovoltaic energy for the Army’s Fort Bliss in El Paso, TX. The project will also analyze

  1. Neurosensory changes of palatal mucousa following Le Fort I osteotomy

    Directory of Open Access Journals (Sweden)

    Bijan Movahedian Attar

    2009-09-01

    Full Text Available

    • BACKGROUND: This study evaluated the sensation of palatal ucosa before and after Le Fort I osteotomy and compared it based on whether greater palatine nerve has been dissected or not.
    • METHODS: Sixteen patients were studied within one week before  urgery and then one week, 6 weeks, 3 months and 6 months after surgery. Four tests including sharp-blunt discrimination, cold perception, pin prick sensation and electrical stimulation were performed.
    • RESULTS: Mean values of electrical stimulation were significantly higher 6 months after surgery (p < 0.05, on the other hand mean values of pin-prick sensation were significantly lower (p < 0.05. All patients regardless of the condition of greater palatine nerve were responsive to cold perception and sharp-blunt discrimination 6 months after surgery.
    • CONCLUSIONS: Following Le Fort I osteotomy, palatal  esponsiveness to electrical stimulation decreases and mechanical hyper sensitization occurs. Dissection of greater palatine nerve was shown to have no effect on the results.
    • KEYWORDS: Lefort I Osteotomy, Palatal Mocousa, Nerve Recovery.

  2. Freight Advanced Traveler Information System (FRATIS) - Dallas-Fort Worth (DFW) prototype : final report.

    Science.gov (United States)

    This is the Final Report for the FRATIS Dallas-Fort Worth DFW prototype system. The FRATIS prototype in : DFW consisted of the following components: optimization algorithm, terminal wait time, route specific : navigation/traffic/weather, and advanced...

  3. 76 FR 22338 - Proposed Fort Ross-Seaview Viticultural Area; Comment Period Reopening

    Science.gov (United States)

    2011-04-21

    ... May 9, 2005, from all interested persons. In response to a request from a local wine industry member... the Fort Ross-Seaview viticultural area. Two local wine industry members supported the petition without qualification; a third industry member supported the viticultural area's establishment while...

  4. Archeological Testing Fort Hood: 1994-1995. Volume 2

    Science.gov (United States)

    1996-10-01

    ASSOCI TES, INC. (662-22) Archeological Testing at Fort Hood. 1994-199.5 569 -48-1941.1080-134 1935 -058 Figure 7.17 Selected Perforator Types: Awl and...Department of Anthropology, University of Arkansas. Huskey, V. 1935 An Archeological Survey of the Nueces Canyon of Texas, Bulletin of the Texas... epr 064lL.Tan I lms expected 08-FH1 Yellow 4 expected expedctd cd .9 15.Q W n• I less M 0 ~ *~Tax~on Total Total Inmr 53 nac na Vertebra.es 1. FcAuifnm

  5. Assessment of pterygomaxillary separation in Le Fort I Osteotomy in class III patients.

    Science.gov (United States)

    Ueki, Koichiro; Hashiba, Yukari; Marukawa, Kohei; Okabe, Katsuhiko; Alam, Shamiul; Nakagawa, Kiyomasa; Yamamoto, Etsuhide

    2009-04-01

    To examine the separation of the pterygomaxillary region at the posterior nasal spine level after Le Fort I osteotomy in Class III patients. The study group consisted of 37 Japanese patients with mandibular prognathism and asymmetry, with maxillary retrognathism or asymmetry. A total of 74 sides were examined. Le Fort I osteotomy was performed without a pterygoid osteotome, with an ultrasonic curette used to remove interference at the pterygomaxillary region. Postoperative computed tomography (CT) was analyzed for all patients. The separation of the pterygomaxillary region and the location of the descending palatine artery were assessed. Although acceptable separation between the maxilla and pterygoid plates was achieved in all patients, an exact separation of the pterygomaxillary junction at the posterior nasal spine level was found in only 18 of 74 sides (24%). In 29 of 74 sides (39.2%), the separation occurred anterior to the descending palatine artery. In 29 of 74 sides (39.2%), complete separation between the maxilla and lateral and/or medial pterygoid plate was not achieved, but lower level separation of the maxilla and pterygoid plate was always complete. The maxillary segments could be moved to the postoperative ideal position in all cases. Le Fort I osteotomy without an osteotome does not always induce an exact separation at the pterygomaxillary junction at the posterior nasal spine level, but the ultrasonic bone curette can remove the interference between maxillary segment and pterygoid plates more safely.

  6. Research, Development and Demonstration of Peak Load Reduction on Distribution Feeders Using Distributed Energy Resources for the City of Fort Collins

    Energy Technology Data Exchange (ETDEWEB)

    Sumner, Dennis [City of Fort Collins Utilities, CO (United States); Vosburg, Tom [City of Fort Collins Utilities, CO (United States); Brunner, Steve [Brendle Group, Fort Collins, CO (United States); Gates, Judy [Woodward, Inc., Fort Collins, CO (United States); Howard, Nathan [Spirae, Inc., Fort Collins, CO (United States); Merton, Andrew [Spirae, Inc., Fort Collins, CO (United States); Wright, Don [Spirae, Inc., Fort Collins, CO (United States); Birlingmair, Doug [Spirae, Inc., Fort Collins, CO (United States)

    2015-10-01

    This project titled “Research, Development and Demonstration of Peak Load Reduction on Distribution Feeders Using Distributed Energy Resources for the City of Fort Collins” evolved in response to the Department of Energy’s (DOE) Funding Opportunity Announcement (FOA) Number DE-PS26-07NT43119. Also referred to as the Fort Collins Renewable and Distributed System Integration (RDSI) Project, the effort was undertaken by a diverse group of local government, higher education and business organizations; and was driven by three overarching goals: I. Fulfill the requirements of the DOE FOA’s Area of Interest 2: Renewable and Distributed System Integration; most notably, to demonstrate the ability to reduce electric system distribution feeder peak load by 15% or more through the coordinated use of Distributed Energy Resources (DER). II. Advance the expertise, technologies and infrastructure necessary to support the long term vision of the Fort Collins Zero Energy District (FortZED) and move towards creating a zero energy district in the Fort Collins “Old Town” area. III. Further the goals of the City of Fort Collins Energy Policy, including the development of a Smart Grid-enabled distribution system in Fort Collins, expanded use of renewable energy, increased energy conservation, and peak load reduction. Through the collaborative efforts of the partner organizations, the Fort Collins RDSI project was successful in achieving all three of these goals. This report is organized into two distinct sections corresponding to the two phases of the project: • Part 1: Feeder Peak Load Reduction and the FortZED Initiative. • Part 2: Forming and Operating Utility Microgrids and Managing Load and Production Variability The original project scope addressed the Part 1 feeder peak load reduction. That work took place from 2009 through 2011 and was largely complete when the project scope was amended to include a demonstration of microgrid operations. While leveraging the

  7. A non-conventional procedure for the 3D modeling of WWI forts

    Science.gov (United States)

    Nocerino, E.; Fiorillo, F.; Minto, S.; Menna, F.; Remondino, F.

    2014-06-01

    2014 is the hundredth anniversary of the outbreak of the First World War (WWI) - or Great War - in Europe and a number of initiatives have been planned to commemorate the tragic event. Until 1918, the Italian Trentino - Alto Adige region was under the Austro - Hungarian Empire and represented one of the most crucial and bloody war front between the Austrian and Italian territories. The region borders were constellated of military fortresses, theatre of battles between the two opposite troops. Unfortunately, most of these military buildings are now ruined and their architectures can be hardly appreciated. The paper presents the initial results of the VAST project (VAlorizzazione Storia e Territorio - Valorization of History and Landscape), that aims to digitally reconstruct the forts located on the plateaus of Luserna, Lavarone and Folgaria. An integrated methodology has been adopted to collect and employ all possible source of information in order to derive precise and photo-realistic 3D digital representations of WWI forts.

  8. Controls Over Materiel Procured for Direct Vendor Delivery

    Science.gov (United States)

    1995-02-10

    National Guard, Company D, 560th Engineer Battalion, Bainbridge, GA Army National Guard, Company E, 121st Infantry Battalion, Tifton , GA Joint...Command, Fort Monmouth, NJ United States Army Forces Command, Atlanta, GA United States Army Materiel Command, Alexandria, VA United States Army...Fort Gillem, GA Headquarters, Fort Lee, Petersburg, VA Headquarters, Fort Riley, KS Headquarters, National Guard Bureau, Washington, DC Headquarters

  9. Die opleiding van bedryfsielkundiges aan die universiteit van Fort Hare

    Directory of Open Access Journals (Sweden)

    W. Botha

    1977-11-01

    Full Text Available Die Departement Bedryfsielkunde aan die Universiteit van Fort Hare is 'n relatiewe jong departement en het eers in 1965 tot stand gekom. Voor hierdie datum is Bedryfsielkunde as 'n kort kursus deur die departement van suiwer Sielkunde aangebied en een van die destydse dosente, Dr. W. Backer, het die inisiatief geneem om 'n selfstandige departement van Bedryfsielkunde in die Fakulteit van Ekonomiese Wetenskappe op die been te bring.

  10. Edutainment, cultural innovation and social inclusion. Fort360, a project for cultural heritage enhancement

    Directory of Open Access Journals (Sweden)

    Paolo Di Pietro Martinelli

    2016-12-01

    Full Text Available   Fort360 project is a cultural initiative that receives the main directives of edutainment processes, trying to provide an answer to the necessity of a capillary system of information and awareness about the dismissing cultural heritage. The proposed study – carried out in the Fort Bravetta, Rome – presents a video where the educational aspect, related to the historical and architectural site contents, is strictly connected with the playful and emotional quality, resulted from a VR interaction with a panoramic video. This first case study focuses on the use of low-cost digital instrumentation and tries to improve the value of culture from the bottom, proposing an alternative way of cultural heritage enjoyment, based on participation and on interdisciplinarity of the proposed contents.

  11. 76 FR 71611 - Notice of Establishment of the Fort Winfield Scott Advisory Committee

    Science.gov (United States)

    2011-11-18

    ... (``Committee''). The Committee will advise the Executive Director of the Presidio Trust on matters pertaining... of once every three months. Nominations: The Presidio Trust will consider nominations of all... PRESIDIO TRUST Notice of Establishment of the Fort Winfield Scott Advisory Committee AGENCY: The...

  12. An ecological response model for the Cache la Poudre River through Fort Collins

    Science.gov (United States)

    Shanahan, Jennifer; Baker, Daniel; Bledsoe, Brian P.; Poff, LeRoy; Merritt, David M.; Bestgen, Kevin R.; Auble, Gregor T.; Kondratieff, Boris C.; Stokes, John; Lorie, Mark; Sanderson, John

    2014-01-01

    The Poudre River Ecological Response Model (ERM) is a collaborative effort initiated by the City of Fort Collins and a team of nine river scientists to provide the City with a tool to improve its understanding of the past, present, and likely future conditions of the Cache la Poudre River ecosystem. The overall ecosystem condition is described through the measurement of key ecological indicators such as shape and character of the stream channel and banks, streamside plant communities and floodplain wetlands, aquatic vegetation and insects, and fishes, both coolwater trout and warmwater native species. The 13- mile-long study area of the Poudre River flows through Fort Collins, Colorado, and is located in an ecological transition zone between the upstream, cold-water, steep-gradient system in the Front Range of the Southern Rocky Mountains and the downstream, warm-water, low-gradient reach in the Colorado high plains.

  13. Establishment of ambient air quality trends using historical monitoring data from Edmonton and Fort McKay, Alberta

    International Nuclear Information System (INIS)

    Faisal, K.; Gamal El-Din, M.

    2006-01-01

    Ambient air trends were assessed using data collected over an 8 year period from monitoring stations in Edmonton and Fort McKay, Alberta. In particular, the study evaluated the short term trends in the concentration of carbon monoxide (CO), nitrogen dioxide (NO 2 ), ozone (O 3 ), and particulate matter (PM 2.5 ) in Edmonton, as well as the NO 2 , O 3 , PM 2.5 , and total hydrocarbons in Fort McKay. In order to evaluate the ambient air trends, this study examined the changes in concentrations of these pollutants between the 50 - 90 percentiles of concentration distributions for a calendar year. These statistics were assumed to be linear over the period of study and fitted using simple linear regression. Hypothesis tests were performed to determine if the slopes of the best-fit lines were greater or less than zero. There was no indication of a statistically significant short-term trend for NO 2 and O 3 for the city of Edmonton. However, statistically pronounced decreasing trends were noted for CO and PM 2.5 . There was no indication of statistically significant trend for any of the pollutants examined at Fort McKay over the study period. It was cautioned that since the period of study over which trends were examined was short, the changes or lack of changes observed do not necessarily indicate long term trends. However, the results suggest that air quality has remained unchanged during the last 6 to 8 years, despite increased economic development in Edmonton and continued oil sands development in Fort McKay

  14. Cultural keystone species in oil sands mine reclamation, Fort McKay, Alberta, Canada

    Energy Technology Data Exchange (ETDEWEB)

    Garibaldi, A.; Straker, J. [Stantec Ltd., Sidney, BC (Canada)

    2009-07-01

    Cultural keystone species (CKS) shape the cultural identify of people through the roles they have in diet, material and spiritual practices. The use of the CKS concept is regarded as a method of addressing linked social and ecological issues. This paper presented the results of using the CKS model in the indigenous community of Fort McKay, Alberta to address, social, ecological and spiritual values in regional mine-land reclamation. Fort McKay is at the epicenter of the existing mine developments. Its residents regard human and environmental health to be be linked and therefore experience the effects of development and subsequent reclamation on both cultural and ecological levels. The community is actively engaged in working with the local mining companies on issues of mine reclamation design. In order to hold meaning to the local people, oil sand operators used the CKS concept in their reclamation efforts to take into account ecological functionality and also address the linked social factors. Five CKS were identified through a literature review and extensive community interviews. The list includes moose, cranberry, blueberry, ratroot and beaver. These 5 CKS were used to focus discussions and make recommendations for relevant land reclamation within Fort McKay traditional territory. The project has influenced the way both the community and oil sands operators engage with reclamation. Lessons learned from this process will help direct reclamation activities on other portions of traditional territory, while offering guidance to other regional developers for addressing cultural values in reclamation on their leases. 15 refs., 1 fig.

  15. Drilling and Testing the DOI041A Coalbed Methane Well, Fort Yukon, Alaska

    Science.gov (United States)

    Clark, Arthur; Barker, Charles E.; Weeks, Edwin P.

    2009-01-01

    The need for affordable energy sources is acute in rural communities of Alaska where costly diesel fuel must be delivered by barge or plane for power generation. Additionally, the transport, transfer, and storage of fuel pose great difficulty in these regions. Although small-scale energy development in remote Arctic locations presents unique challenges, identifying and developing economic, local sources of energy remains a high priority for state and local government. Many areas in rural Alaska contain widespread coal resources that may contain significant amounts of coalbed methane (CBM) that, when extracted, could be used for power generation. However, in many of these areas, little is known concerning the properties that control CBM occurrence and production, including coal bed geometry, coalbed gas content and saturation, reservoir permeability and pressure, and water chemistry. Therefore, drilling and testing to collect these data are required to accurately assess the viability of CBM as a potential energy source in most locations. In 2004, the U.S. Geological Survey (USGS) and Bureau of Land Management (BLM), in cooperation with the U.S. Department of Energy (DOE), the Alaska Department of Geological and Geophysical Surveys (DGGS), the University of Alaska Fairbanks (UAF), the Doyon Native Corporation, and the village of Fort Yukon, organized and funded the drilling of a well at Fort Yukon, Alaska to test coal beds for CBM developmental potential. Fort Yukon is a town of about 600 people and is composed mostly of Gwich'in Athabascan Native Americans. It is located near the center of the Yukon Flats Basin, approximately 145 mi northeast of Fairbanks.

  16. 78 FR 60929 - Notice of Public Meeting of the Fort Scott Council

    Science.gov (United States)

    2013-10-02

    .... Such requests must be stated prominently at the beginning of the comments. The Trust will make... PRESIDIO TRUST Notice of Public Meeting of the Fort Scott Council AGENCY: The Presidio Trust... Scott Council (Council) will be held from 10 a.m. to 12:30 p.m. on Thursday, October 17, 2013. The...

  17. The Fort Logan Lodge: Intentional Community for Chronic Mental Patients. Final Report.

    Science.gov (United States)

    Fort Logan Mental Health Center, Denver, CO.

    This report attempts to identify important variables affecting the success of the Lodge Program, affiliated with the Fort Logan Mental Health Center. The Lodge Program is a community based, group oriented, social and work program for the rehabilitation of the refractory, long stay mental patient. Findings reported include the following: (1) the…

  18. 77 FR 75120 - Black Hills National Forest Advisory Board

    Science.gov (United States)

    2012-12-19

    ... annual Ethics Training; (2) to provide an update on the Sheridan Lake Valve Situation; (3) to provide an..., 1019 North Fifth Street, Custer SD 57730. Please call ahead to Scott Jacobson, Committee Management... conducted: (1) Annual Ethics Training; (2) update on the Sheridan Lake Valve Situation; (3) update on the...

  19. Possible Location of Gaspar Dias Fort in Relation to the Present River Bank

    Digital Repository Service at National Institute of Oceanography (India)

    Mascarenhas, A.; Tripati, S.; ManiMurali, R.

    , it would be worthwhile to delineate the past river bank with respect to the present one, and to check whether any morphological changes occurred since then. Although the fort is marked by the river side in historical maps, the exact position of the shore...

  20. Design Schematics for a Sustainable Parking Lot: Building 2-2332, ENRD Classroom, Fort Bragg, NC

    National Research Council Canada - National Science Library

    Stumpf, Annette

    2003-01-01

    ...) was tasked with planning a sustainable design "charrette" to explore and develop alternative parking lot designs that would meet Fort Bragg's parking needs, as well as its need to meet sustainable...

  1. Efficacy and Safety Evaluation of Myostaal Forte, a Polyherbal Formulation, in Treatment of Knee Osteoarthritis: A Randomised Controlled Pilot Study

    Directory of Open Access Journals (Sweden)

    Raakhi K Tripathi

    2017-10-01

    Full Text Available Introduction: Myostaal Forte, a proprietary poly-herbal formulation, is mixture of nine herbal plant extracts which possess analgesic, anti-inflammatory and chondroprotective properties. Aim: A prospective, randomised, active controlled, 2-arm, parallel group, assessor blind study was planned to evaluate clinical efficacy and safety of Myostaal Forte in patients of knee osteoarthritis. Materials and Methods: Idiopathic knee osteoarthritis cases as per American College of Rheumatology (ACR clinical criteria were screened and recruited. A total of sixty patients were assigned to receive Myostaal Forte TDS (n=30 or Paracetamol 650 mg TDS (n=30 for six weeks. Naproxen was rescue analgesia. Modified Western Ontario and McMaster Universities Arthritis Index (WOMAC, Visual Analogue Scale (VAS, global assessment scores determined by orthopaedic physician at baseline, two, four, six weeks and telephonically at eight weeks. Safety was assessed through laboratory investigations at baseline and six weeks, adverse events and tolerability. Data were expressed as Mean±SD and analysed by Chi-square and unpaired t-test. p0.05. No significant adverse events, changes in the laboratory parameters and excellent compliance to treatment were seen in both the groups. Conclusion: Earlier onset analgesic effect with sustained chondroprotection after treatment cessation makes Myostaal Forte, a safe and effective alternative for treatment of knee osteoarthritis.

  2. Fort Stewart integrated resource assessment. Volume 3: Resource assessment

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

    1993-10-01

    The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO. The tables also present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

  3. Notification: Hotline Complaint – Drinking Water Treatment Plant at the Fort Belknap Indian Community

    Science.gov (United States)

    Project #OA-FY13-0076, November 13, 2012. On March 22, 2012, the Office of Inspector General (OIG) received a hotline complaint on the construction of the Drinking Water Treatment Plant (DWTP) at the Fort Belknap Indian Community.

  4. Biomechanical testing of zirconium dioxide osteosynthesis system for Le Fort I advancement osteotomy fixation.

    Science.gov (United States)

    Hingsammer, Lukas; Grillenberger, Markus; Schagerl, Martin; Malek, Michael; Hunger, Stefan

    2018-01-01

    The following work is the first evaluating the applicability of 3D printed zirconium dioxide ceramic miniplates and screws to stabilize maxillary segments following a Le-Fort I advancement surgery. Conventionally used titanium and individual fabricated zirconium dioxide miniplates were biomechanically tested and compared under an occlusal load of 120N and 500N using 3D finite element analysis. The overall model consisted of 295,477 elements. Under an occlusal load of 500N a safety factor before plastic deformation respectively crack of 2.13 for zirconium dioxide and 4.51 for titanium miniplates has been calculated. From a biomechanical point of view 3D printed ZrO 2 mini-plates and screws are suggested to constitute an appropriate patient specific and metal-free solution for maxillary stabilization after Le Fort I osteotomy. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. A non-conventional procedure for the 3D modeling of WWI forts

    Directory of Open Access Journals (Sweden)

    E. Nocerino

    2014-06-01

    Full Text Available 2014 is the hundredth anniversary of the outbreak of the First World War (WWI – or Great War – in Europe and a number of initiatives have been planned to commemorate the tragic event. Until 1918, the Italian Trentino – Alto Adige region was under the Austro – Hungarian Empire and represented one of the most crucial and bloody war front between the Austrian and Italian territories. The region borders were constellated of military fortresses, theatre of battles between the two opposite troops. Unfortunately, most of these military buildings are now ruined and their architectures can be hardly appreciated. The paper presents the initial results of the VAST project (VAlorizzazione Storia e Territorio – Valorization of History and Landscape, that aims to digitally reconstruct the forts located on the plateaus of Luserna, Lavarone and Folgaria. An integrated methodology has been adopted to collect and employ all possible source of information in order to derive precise and photo-realistic 3D digital representations of WWI forts.

  6. A Study to Evaluate the Organization and the Operating Procedures of the Patient Assistance Function at Brooke Army Medical Center, Fort Sam Houston, Texas

    Science.gov (United States)

    1979-08-01

    15 March 1979. 59Interview with Wendy L. Farace , Head Nurse, Obstetrics/Gynecology Clinic, Brooke Army Medical Center, Fort Sam Houston, Texas, 8...6 February 1979. Farace , Wendy L. Head Nurse, Obstetrica/Gynecology Clinic, Brooke Army Medical Center, Fort Sam Houston, Texas. Interview, 8 January

  7. Operational testing highlights of Fort St. Vrain

    International Nuclear Information System (INIS)

    Cadwell, J.J.; McEachern, D.W.; Read, J.W.; Simon, W.A.; Walker, R.F.

    1975-01-01

    The Fort St. Vrain program has progressed through construction, preoperational testing, fuel loading, initial criticality, and operational testing at power levels up to 2 percent related power. To date, all tests necessary before the rise to full power have been completed, and the rise-to-power program is expected to be resumed again in late 1975. Major plant systems, including the prestressed concrete reactor vessel and circulators, have demonstrated adequate performance. Extensive tests on the reactor core at zero power and up to 2 percent power have demonstrated the accuracy in the design predictions of such core characteristics as critical rod position, control system worths, neutron flux distributions, and temperature coefficients. Gaseous fission product release measurements to date have confirmed the extensive analytical estimates. 6 references

  8. 75 FR 24930 - Fort Bliss (Texas) Army Growth and Force Structure Realignment Final Environmental Impact...

    Science.gov (United States)

    2010-05-06

    ...-PWE, Building 624, Taylor Road, Fort Bliss, TX 79916-6812; e- mail: [email protected] . FOR... Regional Branch Library, 551 Redd Road. In Las Cruces (NM), the New Mexico State University Zuhl Library...

  9. Fission product behavior in the Peach Bottom and Fort St. Vrain HTGRs

    International Nuclear Information System (INIS)

    Hanson, D.L.; Baldwin, N.L.; Strong, D.E.

    1980-11-01

    Actual operating data from Peach Bottom and Fort St. Vrain were compared with code predictions to assess the validity of the methods used to predict the behavior of fission products in the primary coolant circuit. For both reactors the measured circuit activities were significantly below design values, and the observations generally verify the codes used for large HTGR design

  10. 77 FR 21448 - Security Zone; 2012 Fleet Week, Port Everglades, Fort Lauderdale, FL

    Science.gov (United States)

    2012-04-10

    ... Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that may disproportionately affect children...-AA87 Security Zone; 2012 Fleet Week, Port Everglades, Fort Lauderdale, FL AGENCY: Coast Guard, DHS...

  11. Warm Dry Weather Conditions Cause of 2016 Fort McMurray Wild Forest Fire and Associated Air Quality

    Science.gov (United States)

    de Azevedo, S. C.; Singh, R. P.; da Silva, E. A., Sr.

    2016-12-01

    The climate change is evident from the increasing temperature around the world, day to day life and increasing frequency of natural hazards. The warm and dry conditions are the cause of frequent forest fires around the globe. Forest fires severely affect the air quality and human health. Multi sensor satellites and dense network of ground stations provide information about vegetation health, meteorological, air quality and atmospheric parameters. We have carried out detailed analysis of satellite and ground data of wild forest fire that occurred in May 2016 in Fort McMurray, Alberta, Canada. This wild forest fire destroyed 10 per cent of Fort McMurray's housing and forced more than 90,000 people to evacuate the surrounding areas. Our results show that the warm and dry conditions with low rainfall were the cause of Fort McMurray wild fire. The air quality parameters (particulate matter, CO, ozone, NO2, methane) and greenhouse gases measured from Atmospheric Infrared Sounder (AIRS) satellite show enhanced levels soon after the forest fire. The emissions from the forest fire affected health of population living in surrounding areas up to 300 km radius.

  12. Nondestructive examination of 51 fuel and reflector elements from Fort St. Vrain Core Segment 1

    International Nuclear Information System (INIS)

    Miller, C.M.; Saurwein, J.J.

    1980-12-01

    Fifty-one fuel and reflector elements irradiated in core segment 1 of the Fort St. Vrain High-Temperature Gas-Cooled Reactor (HTGR) were inspected dimensionally and visually in the Hot Service Facility at Fort St. Vrain in July 1979. Time- and volume-averaged graphite temperatures for the examined fuel elements ranged from approx. 400 0 to 750 0 C. Fast neutron fluences varied from approx. 0.3 x 10 25 n/m 2 to 1.0 x 10 25 n/m 2 (E > 29 fJ)/sub HTGR/. Nearly all of the examined elements shrank in both axial and radial dimensions. The measured data were compared with strain and bow predictions obtained from SURVEY/STRESS, a computer code that employs viscoelastic beam theory to calculate stresses and deformations in HTGR fuel elements

  13. [Russian experience with Vitaprost Forte suppositories in patients with lower urinary tract symptoms and benign prostatic hyperplasia: comparative analysis of studies].

    Science.gov (United States)

    Korneev, I A

    2017-07-01

    The article reviews the domestic studies showing the efficacy and safety of suppositories containing prostate extract (Samprost substance) Vitaprost Forte in treating men with lower urinary tract symptoms secondary to benign prostatic hyperplasia. The data obtained by Russian specialists confirm the effectiveness of Vitaprost Forte suppositories in managing patients with moderate LUTS and infravesical obstruction caused by BPH to reduce dysuria, improve the quality of life and normalize urodynamic parameters.

  14. The hill forts and castle mounds in Lithuania: interaction between geodiversity and human-shaped landscape

    Science.gov (United States)

    Skridlaite, Grazina; Guobyte, Rimante; Satkunas, Jonas

    2015-04-01

    Lithuania is famous for its abundant, picturesque hill forts and castle mounds of natural origin. In Lithuania as well as in whole Europe the fortified hills were used as the society dwelling place since the beginning of the Late Bronze Age. Their importance increased when Livonian and Teutonic Orders directed a series of military campaigns against Lithuania with the aim of expansion of Christianity in the region at the end of 1st millennium AD, and they were intensively used till the beginning of the 15th c. when most of them were burned down during fights with the Orders or just abandoned due to the changing political and economical situation. What types of the geodiversity were used for fortified dwellings? The choice in a particular area depended on a variety of geomorphology left behind the retreating ice sheets. High spots dominating their surroundings were of prime interest. In E and SE Lithuania, the Baltic Upland hills marking the eastern margin of the last Weichselian glacier hosted numerous fortified settlements from the end of 2nd millennium BC to the Medieval Ages (Narkunai, Velikuskes etc). In W Lithuania, plateau-like hills of the insular Samogitian Upland had been repeatedly fortified from the beginning of 1st millennium AD to the 14th century (Satrija, Medvegalis etc). Chains of hill forts and castle mounds feature the slopes of glaciofluvial valleys of Nemunas, Neris and other rivers where the slopes were dissected by affluent rivulets and ravines and transformed into isolated, well protected hills (Kernave, Punia, Veliuona etc). Peninsulas and headlands formed by the erosion of fluvial and lacustrine deposits were used in the lowlands, e.g. in central and N Lithuania (Paberze, Mezotne etc). How much the landscape was modified for defense purposes? Long-term erosion and overgrowing vegetation damaged the former fortified sites, however some remains and the archeological excavations allowed their reconstruction. The fortified Bronze Age settlements

  15. Sustainable Materials Replacement for Prevention of Corrosion at Fort Lewis, WA

    Science.gov (United States)

    2009-08-01

    documents a building reclamation project at Fort Lewis, WA, in which significant portions of the work were completed using market -available sustainable...contractors to submit previous technology performance or test documentation, which is generally published as products are introduced to the market . If...evaluate the performance of the E2C2 in its final configuration. Energy use will be analyzed using a Building Infor- mation Model ( BIM ) to simulate

  16. 78 FR 33808 - Foreign-Trade Zone (FTZ) 39-Dallas-Fort Worth, Texas; Notification of Proposed Production...

    Science.gov (United States)

    2013-06-05

    ... Street, and 4600 Blue Mound Road, Fort Worth (Tarrant County), Texas. A separate application for ``usage... abroad include: plastic labels; parts of fans (housings, grills, pedestal assemblies, blades); electric...

  17. Ânion gap corrigido para albumina, fosfato e lactato é um bom preditor de íon gap forte em pacientes enfermos graves: estudo de coorte em nicho

    Directory of Open Access Journals (Sweden)

    Fernando Godinho Zampieri

    2013-09-01

    Full Text Available OBJETIVO: Ânion gap corrigido e íon gap forte são usados comumente para estimar os ânions não medidos. Avaliamos o desempenho do ânion gap corrigido para albumina, fosfato e lactato na predição do íon gap forte em uma população mista de pacientes enfermos graves. Formulamos a hipótese de que o ânion gap corrigido para albumina, fosfato e lactato seria um bom preditor do íon gap forte, independentemente da presença de acidose metabólica. Além disso, avaliamos o impacto do íon gap forte por ocasião da admissão na mortalidade hospitalar. MÉTODOS: Incluímos 84 pacientes gravemente enfermos. A correlação e a concordância entre o ânion gap corrigido para albumina, fosfato e lactato e o íon gap forte foi avaliada utilizando-se os testes de correlação de Pearson, regressão linear, plot de Bland-Altman e pelo cálculo do coeficiente de correlação interclasse. Foram realizadas duas análises de subgrupos: uma para pacientes com excesso de base -2mEq/L (grupo com alto excesso de base. Foi realizada uma regressão logística para avaliar a associação entre os níveis de íon gap forte na admissão e a mortalidade hospitalar. RESULTADOS: Houve correlação muito forte e uma boa concordância entre o ânion gap corrigido para albumina, fosfato e lactato e o íon gap forte na população geral (r2=0,94; bias 1,40; limites de concordância de -0,75 a 3,57. A correlação foi também elevada nos grupos com baixo excesso de base (r2=0,94 e alto excesso de base (r2=0,92. Estavam presentes níveis elevados de íon gap forte em 66% da população total e 42% dos casos do grupo alto excesso de. Íon gap forte não se associou com a mortalidade hospitalar, conforme avaliação pela regressão logística. CONCLUSÃO: O ânion gap corrigido para albumina, fosfato e lactato e o íon gap forte tiveram uma excelente correlação. Os ânions não medidos estão frequentemente elevados em pacientes gravemente enfermos com excesso de base

  18. KPI Student Satisfaction Survey, 2001. Executive Summary Report.

    Science.gov (United States)

    Sheridan Coll. (Ontario).

    The KPI (Key Performance Indicators) Student Satisfaction Survey is a paper-based survey distributed to all students in Ontario's Colleges of Applied Arts and Technology. The results of the Sheridan College survey for 2001 are presented in this report. The student population at Sheridan for the winter 2001 survey was 9,134. A total of 6,566…

  19. Freight Advanced Traveler Information System (FRATIS) - Dallas-Fort Worth : as-built system architecture and design.

    Science.gov (United States)

    This document describes the As-Built System Architecture and Design for the FRATIS Dallas-Fort Worth : DFW prototype system. The FRATIS prototype in DFW consisted of the following components: : optimization algorithm, terminal wait time, route specif...

  20. Parametric study of the low-enriched uranium integrated Fort-Saint-Vrain element; comparative evaluation with the interacting tubular element

    International Nuclear Information System (INIS)

    Cerles, J.M.; Carvallo, G.; Vallepin, C.

    1971-11-01

    This paper presents a study of the influence of the different geometric and neutronic parameters on the calculation of the cycle with low-enriched uranium in a Fort-Saint-Vrain type brick. The study is divided in two parts: a stage of physics, essentially neutronics; an economical part where the costs are taken into account. At the level of studies of neutronics and costs, a parallel comparison is developed between the brick Fort-Saint-Vrain and the interacting tubular element, and even thorium. 6 refs. 29 figs [fr

  1. The United States Army Air Arm, April 1861 to April 1917

    Science.gov (United States)

    1985-01-01

    the enlisted men messing with a coast artillery company and Geiger living at the Fort.84 The base at Fort Kamehameha was far from satisfactory...station at Fort Kamehameha , and the fourth to the Canal Zone. The Philippine and Hawaiian companies were to have seaplane equip- ment but were to have no...fol- lowed by Capt. John B. Brooks and 49 men, who sailed on the March transport. They were sta- tioned temporarily at Fort Kamehameha while Curry

  2. Master environmental plan for Fort Devens, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. (Argonne National Lab., IL (United States). Energy Systems Div.)

    1991-11-01

    Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

  3. Fort St. Vrain defueling ampersand decommissioning considerations

    International Nuclear Information System (INIS)

    Warembourg, D.

    1994-01-01

    Fort St. Vrain Nuclear Generating Station (FSV) is one of the first commercial reactors to be decommissioned under NRC's decommissioning rule. The defueling and decommissioning of this 330 MWe High Temperature Gas Cooled Reactor (HTGR) has involved many challenges for Public Service Company of Colorado (PSC) including defueling to an Independent Spent Fuel Storage Installation (ISFSI), establishing decommissioning funding, obtaining regulatory approvals, arranging for waste disposal, and managing a large fixed price decommissioning contract. In 1990, a team comprised of the Westinghouse Corporation and Morrison Knudsen Corporation, with the Scientific Ecology Group as a major subcontractor, was contracted by PSC to perform the decommissioning under a fixed price contract. Physical work activities began in August 1992. Currently, physical dismantlement activities are about 45% complete, the project is on schedule, and is within budget

  4. Fort Collins Science Center Ecosystem Dynamics Branch

    Science.gov (United States)

    Wilson, Jim; Melcher, C.; Bowen, Z.

    2009-01-01

    Complex natural resource issues require understanding a web of interactions among ecosystem components that are (1) interdisciplinary, encompassing physical, chemical, and biological processes; (2) spatially complex, involving movements of animals, water, and airborne materials across a range of landscapes and jurisdictions; and (3) temporally complex, occurring over days, weeks, or years, sometimes involving response lags to alteration or exhibiting large natural variation. Scientists in the Ecosystem Dynamics Branch of the U.S. Geological Survey, Fort Collins Science Center, investigate a diversity of these complex natural resource questions at the landscape and systems levels. This Fact Sheet describes the work of the Ecosystems Dynamics Branch, which is focused on energy and land use, climate change and long-term integrated assessments, herbivore-ecosystem interactions, fire and post-fire restoration, and environmental flows and river restoration.

  5. Energy Optimization Assessment at U.S. Army Installations: Fort Bliss, TX

    Science.gov (United States)

    2008-09-01

    Log dampers, temperatures, actuator signals, and other parameters to identify problems. Adjust chiller and boiler setpoints and control curves...installation. The lowest setpoints were found in the Centennial Club, with 52 °F during unoccupied hours (morn- ing). The chillers ran pretty much fully loaded...ER D C/ CE R L TR -0 8 -1 5 Energy Optimization Assessment at U.S. Army Installations Fort Bliss, TX David M. Underwood, Alexander M

  6. Data Mining the Corporate Dental System of USA DENTAC Fort Bragg

    Science.gov (United States)

    2016-06-10

    appointment data were queried for active duty Soldiers assigned to Fort Bragg, NC. All data were analyzed by using SPSS version 22.0 ( SPSS , Chicago, IL...Clinic. For each appointment the appointment type, date, and dental wellness classification were retained for analysis . For the purposes of this study...considered part of the Go First Class program. The analysis was split into multiple phases, beginning with a chi-square test for trend to

  7. Study of neutral composition of lower thermosphere at Fort Churchill.

    Science.gov (United States)

    Nier, A. O.; Hickman, D. R.

    1973-01-01

    On Feb. 4 and 6, 1969, and May 11, 1970, Aerobee rockets carrying neutral mass spectrometers were flown at Fort Churchill, Canada during conditions of low geomagnetic activity. As in earlier flights at White Sands, New Mexico, each rocket carried both 'open' and 'closed' ion source instruments. Vertical profiles of N2, O2, O, Ar, and He were measured. Results obtained were essentially the same as those observed at White Sands except that for the winter flights helium appeared to be in diffusive equilibrium.

  8. Army Support to the United States Border Patrol in the 21st Century

    Science.gov (United States)

    2011-05-19

    and Lieutenant Colonel (Promotable) Clifford J. Weinstein (United States Marine Corps). Thank you for letting me travel this important journey and...Operating Bases in Deming and Playas , New Mexico. The 4-14 CAV was preparing for its deployment to the Joint Readiness Training Center (JRTC) at Fort Polk...write strategic policy. Once a suitable bench of key planners comes back to USBP, they can travel throughout the UCs and train other agents across the

  9. Procarti Forte in the Complex Treatment of Patients with Early-Stage Osteoarthritis

    Directory of Open Access Journals (Sweden)

    O.A. Burianov

    2016-04-01

    Full Text Available The article deals with the issue of the treatment of osteoarthritis. The review of current recommendations on the feasibility of using glucosamine sulfate, chondroitin sulfate, hyaluronic acid, using of SYSADOA drugs, metabolic drugs was performed. The study on the efficacy and safety of using combination drug Procarti Forte in the system of treatment of patients with early-stage osteoarthritis is presented.

  10. Historical Analysis of Land Cover/Condition Trends at Fort Bliss, Texas, Using Remotely Sensed Imagery

    National Research Council Canada - National Science Library

    Tweddale, Scott

    2001-01-01

    .... They need a cost-effective method of assessing and monitoring land condition. The objective of this research was to characterize the small scale, gross level change in land condition on a selected area of Fort Bliss over a 23-year period...

  11. 77 FR 51064 - Huntington Foam LLC, Fort Smith, AR; Notice of Affirmative Determination Regarding Application...

    Science.gov (United States)

    2012-08-23

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-81,475] Huntington Foam LLC, Fort Smith, AR; Notice of Affirmative Determination Regarding Application for Reconsideration By application dated May 21, 2012, the State Workforce Office requested administrative reconsideration of the negative...

  12. 75 FR 40034 - Northeastern Tributary Reservoirs Land Management Plan, Beaver Creek, Clear Creek, Boone, Fort...

    Science.gov (United States)

    2010-07-13

    ... TENNESSEE VALLEY AUTHORITY Northeastern Tributary Reservoirs Land Management Plan, Beaver Creek...-managed public land on Beaver Creek, Clear Creek, Boone, Fort Patrick Henry, South Holston, Watauga, and... Proposed Land Use Alternative) identified in the final environmental impact statement (FEIS). Under the...

  13. Revisiting "Narrow Bipolar Event" intracloud lightning using the FORTE satellite

    Science.gov (United States)

    Jacobson, A. R.; Light, T. E. L.

    2012-02-01

    The lightning stroke called a "Narrow Bipolar Event", or NBE, is an intracloud discharge responsible for significant charge redistribution. The NBE occurs within 10-20 μs, and some associated process emits irregular bursts of intense radio noise, fading at shorter timescales, sporadically during the charge transfer. In previous reports, the NBE has been inferred to be quite different from other forms of lightning strokes, in two ways: First, the NBE has been inferred to be relatively dark (non-luminous) compared to other lightning strokes. Second, the NBE has been inferred to be isolated within the storm, usually not participating in flashes, but when it is in a flash, the NBE has been inferred to be the flash initiator. These two inferences have sufficiently stark implications for NBE physics that they should be subjected to further independent test, with improved statistics. We attempt such a test with both optical and radio data from the FORTE satellite, and with lightning-stroke data from the Los Alamos Sferic Array. We show rigorously that by the metric of triggering the PDD optical photometer aboard the FORTE satellite, NBE discharges are indeed less luminous than ordinary lightning. Referred to an effective isotropic emitter at the cloud top, NBE light output is inferred to be less than ~3 × 108 W. To address isolation of NBEs, we first expand the pool of geolocated intracloud radio recordings, by borrowing geolocations from either the same flash's or the same storm's other recordings. In this manner we generate a pool of ~2 × 105 unique and independent FORTE intracloud radio recordings, whose slant range from the satellite can be inferred. We then use this slant range to calculate the Effective Radiated Power (ERP) at the radio source, in the passband 26-49 MHz. Stratifying the radio recordings by ERP into eight bins, from a lowest bin (140 kW), we document a trend for the radio recordings to become more isolated in time as the ERP increases. The highest

  14. Information management needs for Fort Calhoun's design basis reconstitution project

    International Nuclear Information System (INIS)

    Beach, D.R.; Erickson, E.A.; Gambhir, S.K.; Parsons, R.D.

    1989-01-01

    While the need for information management is not new to the nuclear industry or Omaha Public Power District (OPPD), the interrelationship among design information, multiple systems, and design basis issues has necessitated the management of this information in new ways. The project team involved in the reconstitution of the design basis for OPPD's Fort Calhoun nuclear station has experienced the need for the developed effective methods for managing the vast amount of interrelated information associated with this effort. This management of information has been necessary to ensure that design basis documents (DBDs) adequately reflect the interrelated nature of component, system, and plant design; are complete and accurate; and are produced and maintained in a cost-effective manner. Fort Calhoun's aggressive design basis reconstitution project began in early 1987. The present scope of the project includes the production of 52 system and plant level DBDs; currently the project is ∼50% complete with DBDs in various stages of completion, from pilot DBDs through DBDs with approved formats, which have been issued for use. The experience in producing these documents has lead to a growing understanding of the special need for information management in each stage of the project. The development of the information tracking and management processes for the various stages of DBD development has proven to be cost-effective and gives a level of assurance that information has been included in the DBDs consistently and accurately

  15. Wooden combs from the Roman fort at Vechten: the bodily appearance of soldiers

    NARCIS (Netherlands)

    Derks, A.M.J.; Vos, W.K.

    2010-01-01

    Abstract Excavations in the late 19th century and surveys carried out in the 1970s have produced 12 boxwood combs from the Roman fort at Vechten (NL). They are to be considered waste material that was dumped in the river Rhine which in the Roman period ran just north of the camp. In this article,

  16. Dust Plume Modeling from Ranges and Maneuver Areas on Fort Bliss and the White Sands Missile Range: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, Elaine G.; Barnard, James C.; Rutz, Frederick C.; Pekour, Mikhail S.; Rishel, Jeremy P.; Shaw, William J.

    2009-05-04

    The potential for air quality impacts from heavy mechanized vehicles operating on and between the unpaved main supply routes at Fort Bliss and White Sands Missile Range was investigated. This report details efforts by the staff of Pacific Northwest National Laboratory for the Fort Bliss Directorate of Environment in this investigation. Dust emission and dispersion from typical move-out activities occurring on the installations were simulated using the atmospheric modeling system DUSTRAN. Major assumptions associated with designing the modeling scenarios are summarized and results of simulations conducted under these assumptions are presented for four representative meteorological periods.

  17. Assessment of soil-gas, seep, and soil contamination at the North Range Road Landfill, Fort Gordon, Georgia, 2008-2009

    Science.gov (United States)

    Landmeyer, James E.; Falls, W. Fred; Ratliff, W. Hagan; Wellborn, John B.

    2011-01-01

    Soil gas, seeps, and soil were assessed for contaminants at the North Range Road Landfill at Fort Gordon, Georgia, from October 2008 to September 2009. The assessment included delineating organic contaminants present in soil-gas samples beneath the area estimated to be the landfill and in water samples collected from three seeps at the base of the landfill. Inorganic contaminants were determined in three seep samples and in soil samples. This assessment was conducted to provide environmental contamination data to Fort Gordon pursuant to requirements for the Resource Conservation and Recovery Act Part B Hazardous Waste Permit process.

  18. Biological Assessment of Streams Associated with the Northern Training Complex at Fort knox, Kentucky, August 2000

    National Research Council Canada - National Science Library

    Payne, Berry

    2001-01-01

    .... The benthic macroinvertebrate aspect of the U.S. Environmental Protection Agency's Rapid Bioassessment Protocol was applied in August 2000 to selected streams likely to be affected by proposed improvements of training facilities on Fort Knox...

  19. A reactivity accidents simulation of the Fort Saint Vrain HTGR

    International Nuclear Information System (INIS)

    Fainer, Gerson

    1980-01-01

    A reactivity accidents analysis of the Fort Saint Vrain HTGR was made. The following accidents were analysed 1) A rod pair withdrawal accident during normal operation, 2) A rod pair ejection accident, 3) A rod pair withdrawal accident during startup operations at source levels and 4) Multiple rod pair withdrawal accident. All the simulations were performed by using the BLOOST-6 nuclear code The steady state reactor operation results obtained with the code were consistent with the design reactor data. The numerical analysis showed that all accidents - except the first one - cause particle failure. (author)

  20. Construction, testing, and initial operation of Fort St. Vrain PCRV

    International Nuclear Information System (INIS)

    Ople, F.S. Jr.; Neylan, A.J.

    1975-01-01

    The Fort St. Vrain (FSV) Nuclear Generating Station is the first station in the USA to use a prestressed concrete reactor vessel (PCRV). The PCRV was designed and constructed by General Atomic. Construction of the PCRV was completed in 1970; the pressure and leak tests were completed in 1971. The structural behavior of the PCRV has been monitored by installed instrumentation since start of construction. The highlights of the actual construction, testing, and initial operation of the PCRV, including a comparison of structural behavior, where possible, between observed data and analytical predictions. (U.S.)

  1. Reflector dowel strength test, Fort St. Vrain

    International Nuclear Information System (INIS)

    Doll, D.W.

    1975-01-01

    The strength of the 44.45 mm (1.75 in.) diameter Fort St. Vrain (FSV) reflector dowel for loads directed radially inward toward the center of the element was measured. For a statically applied load, the strength exceeded 5783 N (1300 lb) in direct shear. This strength remained after load cycling 100 times to 4448 N (1000 lb), 10 times to 4893 N (1100 lb), 10 times to 5338 N (1200 lb), and two times to 5783 N (1300 lb). Typically, the deflection to ultimate failure was approximately 1.0 mm (0.04 in.). At about 3316 N (750 lb) and 0.20 mm (0.008 in.) deflection, one of the webs between the dowel and a coolant hole cracked, apparently redistributing the load. No further failure occurred up to the ultimate load of 5783+ N (1300+ lb)

  2. Morphometric and molecular analyses of the sand fly species Lutzomyia shannoni (Diptera: Psychodidae: Phlebotominae) collected from seven different geographical areas in the southeastern United States.

    Science.gov (United States)

    Florin, David A; Davies, Stephen J; Olsen, Cara; Lawyer, Phillip; Lipnick, Robert; Schultz, George; Rowton, Edgar; Wilkerson, Richard; Keep, Lisa

    2011-03-01

    A morphometric and molecular study of adult male and female Lutzomyia shannoni (Dyar 1929) collected at seven different locations within the southeastern United States was conducted to assess the degree of divergence between the grouped specimens from each location. The collection locations were as follows: Fort Bragg, NC; Fort Campbell, KY; Fort Rucker, AL; Ossabaw Island, GA; Patuxent National Wildlife Research Refuge, MD; Suwannee National Wildlife Refuge, FL; and Baton Rouge, LA. Forty males and forty females from each location were analyzed morphometrically from 54 and 49 character measurements, respectively. In addition, the molecular markers consisting of the partial cytochrome c oxidase subunit I (from 105 sand flies: 15 specimens/collection site) and the partial internal transcribed spacer 2 (from 42 sand flies: six specimens/collection site) were compared. Multivariate analyses indicate that the low degree of variation between the grouped specimens from each collection site prevents the separation of any collection site into an entity that could be interpreted as a distinct population. The molecular analyses were in concordance with the morphometric study as no collection location grouped into a separate population based on the two partial markers. The grouped specimens from each collection site appear to be within the normal variance of the species, indicating a single population in the southeast United States. It is recommended that additional character analyses of L. shannoni based on more molecular markers, behavioral, ecological, and physiological characteristics, be conducted before ruling out the possibility of populations or a cryptic species complex within the southeastern United States.

  3. End-use energy characterization and conservation potentials at DoD Facilities: An analysis of electricity use at Fort Hood, Texas

    Energy Technology Data Exchange (ETDEWEB)

    Akbari, H.; Konopacki, S.

    1995-05-01

    This report discusses the application of the LBL`s End-use Disaggregation Algorithm (EDA) to a DoD installation and presents hourly reconciled end-use data for all major building types and end uses. The project initially focused on achieving these objectives and pilot-testing the methodology at Fort Hood, Texas. Fort Hood, with over 5000 buildings was determined to have representative samples of nearly all of the major building types in use on DoD installations. These building types at Fort Hood include: office, administration, vehicle maintenance, shop, hospital, grocery store, retail store, car wash, church, restaurant, single-family detached housing, two and four-plex housings, and apartment building. Up to 11 end uses were developed for each prototype, consisting of 9 electric and 2 gas; however, only electric end uses were reconciled against known data and weather conditions. The electric end uses are space cooling, ventilation, cooking, miscellaneous/plugs, refrigeration, exterior lighting, interior lighting, process loads, and street lighting. The gas end uses are space heating and hot water heating. Space heating energy-use intensities were simulated only. The EDA was applied to 10 separate feeders from the three substations at Fort Hood. The results from the analyses of these ten feeders were extrapolated to estimate energy use by end use for the entire installation. The results show that administration, residential, and the bar-rack buildings are the largest consumers of electricity for a total of 250GWh per year (74% of annual consumption). By end use, cooling, ventilation, miscellaneous, and indoor lighting consume almost 84% of total electricity use. The contribution to the peak power demand is highest by residential sector (35%, 24 MW), followed by administration buildings (30%), and barrack (14%). For the entire Fort Hood installation, cooling is 54% of the peak demand (38 MW), followed by interior lighting at 18%, and miscellaneous end uses by 12%.

  4. 75 FR 36371 - Draft Environmental Impact Statement Addressing Campus Development at Fort Meade, MD

    Science.gov (United States)

    2010-06-25

    ...'s (NSA) continually evolving requirements and for Intelligence Community use. The purpose of the..., or e-mail [email protected]nsa.gov . SUPPLEMENTARY INFORMATION: Background: The NSA is a tenant DOD agency on Fort Meade. NSA is a high-technology organization that is on the frontier of communications and data...

  5. Craniofacial stability in patients with Crouzon or Apert syndrome after Le Fort III distraction osteogenesis

    NARCIS (Netherlands)

    Reitsma, J.H.; Ongkosuwito, E.M.; Buschang, P.H.; van Adrichem, L.N.A.; Prahl-Andersen, B.

    2013-01-01

    Objective: Le Fort III osteotomy with distraction osteogenesis (DO) is used to improve the retruded midface in patients with Crouzon or Apert syndrome. This study aimed to evaluate sagittal and vertical preoperative and postoperative cephalometric changes of DO of the midface in patients with

  6. Craniofacial stability in patients with crouzon or apert syndrome after le fort III distraction osteogenesis

    NARCIS (Netherlands)

    J.H. Reitsma (Jacobus Harmen); E.M. Ongkosuwito (Edwin); P.H. Buschang (Peter); L.N.A. V Adrichem (Léon); B. Prahl-Andersen (Birte)

    2013-01-01

    textabstractObjective: Le Fort III osteotomy with distraction osteogenesis (DO) is used to improve the retruded midface in patients with Crouzon or Apert syndrome. This study aimed to evaluate sagittal and vertical preoperative and postoperative cephalometric changes of DO of the midface in patients

  7. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Science.gov (United States)

    2013-08-29

    ... Bar Dams AGENCY: Tennessee Valley Authority. ACTION: Issuance of Record of Decision. SUMMARY: This... the dam safety modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams. The notice of... Loudoun, Tellico, and Watts Bar Dams was published in the Federal Register on May 31, 2013. This...

  8. Preliminary assessment of streamflow characteristics for selected streams at Fort Gordon, Georgia, 1999-2000

    Science.gov (United States)

    Stamey, Timothy C.

    2001-01-01

    In 1999, the U.S. Geological Survey, in cooperation with the U.S. Army Signal Center and Fort Gordon, began collection of periodic streamflow data at four streams on the military base to assess and estimate streamflow characteristics of those streams for potential water-supply sources. Simple and reliable methods of determining streamflow characteristics of selected streams on the military base are needed for the initial implementation of the Fort Gordon Integrated Natural Resources Management Plan. Long-term streamflow data from the Butler Creek streamflow gaging station were used along with several concurrent discharge measurements made at three selected partial-record streamflow stations on Fort Gordon to determine selected low-flow streamflow characteristics. Streamflow data were collected and analyzed using standard U.S. Geological Survey methods and computer application programs to verify the use of simple drainage area to discharge ratios, which were used to estimate the low-flow characteristics for the selected streams. Low-flow data computed based on daily mean streamflow include: mean discharges for consecutive 1-, 3-, 7-, 14-, and 30-day period and low-flow estimates of 7Q10, 30Q2, 60Q2, and 90Q2 recurrence intervals. Flow-duration data also were determined for the 10-, 30-, 50-, 70-, and 90-percent exceedence flows. Preliminary analyses of the streamflow indicate that the flow duration and selected low-flow statistics for the selected streams averages from about 0.15 to 2.27 cubic feet per square mile. The long-term gaged streamflow data indicate that the streamflow conditions for the period analyzed were in the 50- to 90-percent flow range, or in which streamflow would be exceeded about 50 to 90 percent of the time.

  9. Nondestructive evaluation of the oxidation and strength of the Fort Saint Vrain HTGR support block

    International Nuclear Information System (INIS)

    Tingey, G.L.; Posakony, G.J.; Morgan, W.C.; Prince, J.M.; Hill, R.W.; Lessor, D.L.

    1982-04-01

    Non-destructive detection of changes in the strength of graphite support structures in a HTGR appears to be feasible using sonic velocity measurements where access for through transmission is possible. Therefore, future HTGR designs should consider providing such access. Where access is not available, strength changes can be correlated with oxidation profiles in the support member. These oxidation profiles can be determined non-destructively by a combination of eddy current measurements to detect near surface oxidation and sonic backscattering measurements designed to determine oxidation in depth. The Fort Saint Vrain reactor provides an operating reactor to test the applicability of the eddy current and sonic backscattering techniques for determination of oxidation in a support block. Furthermore, such tests in Fort Saint Vrain will supply base line data which will be useful in assuring an adequate strength of the support structure for the lifetime of the reactor. Equipment is, therefore, being developed for tests to be conducted during the next major refueling of the reactor

  10. Assessment of loblolly pine decline and site conditions on Fort Benning Military Reservation, GA

    Science.gov (United States)

    Roger D. Menard; Lori G. Eckhardt; Nolan J. Hess

    2010-01-01

    A decline of loblolly pine (Pinus taeda L.), characterized by expanding areas of declining and dead trees, has become prevalent at Fort Benning, GA. A 3-year study was conducted to determine the kinds of fungi, insects, and site disturbances associated with this problem. The insects Dendroctonus terebrans, Hylastes salebrosus, H. tenuis, Pachylobius picivorus...

  11. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 282 Renewable Energy Opportunities at Fort Gordon, Georgia

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, Brian K.; Gorrissen, Willy J.; Hand, James R.; Horner, Jacob A.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Williamson, Jennifer L.; Nesse, Ronald J.

    2010-09-30

    This document provides an overview of renewable resource potential at Fort Gordon, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the American Recovery and Reinvestment Act (ARRA) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Gordon took place on March 9, 2010.

  12. Dynamic computer simulation of the Fort St. Vrain steam turbines

    International Nuclear Information System (INIS)

    Conklin, J.C.

    1983-01-01

    A computer simulation is described for the dynamic response of the Fort St. Vrain nuclear reactor regenerative intermediate- and low-pressure steam turbines. The fundamental computer-modeling assumptions for the turbines and feedwater heaters are developed. A turbine heat balance specifying steam and feedwater conditions at a given generator load and the volumes of the feedwater heaters are all that are necessary as descriptive input parameters. Actual plant data for a generator load reduction from 100 to 50% power (which occurred as part of a plant transient on November 9, 1981) are compared with computer-generated predictions, with reasonably good agreement

  13. Exploration Drilling and Technology Demonstration At Fort Bliss

    Energy Technology Data Exchange (ETDEWEB)

    Barker, Ben; Moore, Joe [EGI; Segall, Marylin; Nash, Greg; Simmons, Stuart; Jones, Clay; Lear, Jon; Bennett, Carlon

    2014-02-26

    The Tularosa-Hueco basin in south-central New Mexico has long been known as an extensional area of high heat flow. Much of the basin is within the Fort Bliss military reservation, which is an exceptionally high value customer for power independent of the regional electric grid and for direct use energy in building climate control. A series of slim holes drilled in the 1990s established the existence of a thermal anomaly but not its practical value. This study began in 2009 with a demonstration of new exploration drilling technology. The subsequent phases reported here delivered a useful well, comparative exploration data sets and encouragement for further development. A production-size well, RMI56-5, was sited after extensive study of archival and newly collected data in 2010-2011. Most of 2012 was taken up with getting state and Federal authorities to agree on a lead agency for permitting purposes, getting a drilling permit and redesigning the drilling program to suit available equipment. In 2013 we drilled, logged and tested a 924 m well on the McGregor Range at Fort Bliss using a reverse circulation rig. Rig tests demonstrated commercial permeability and the well has a 7-inch slotted liner for use either in production or injection. An August 2013 survey of the completed well showed a temperature of 90 C with no reversal, the highest such temperature in the vicinity. The well’s proximity to demand suggests a potentially valuable resource for direct use heat and emergency power generation. The drilling produced cuttings of excellent size and quality. These were subjected to traditional analyses (thin sections, XRD) and to the QEMScan™ for comparison. QEMScan™ technology includes algorithms for determining such properties of rocks as density, mineralogy, heavy/light atoms, and porosity to be compared with direct measurements of the cuttings. In addition to a complete cuttings set, conventional and resistivity image logs were obtained in the open hole before

  14. Conceptual design report for the mechanical disassembly of Fort St. Vrain fuel elements

    International Nuclear Information System (INIS)

    Lord, D.L.; Wadsworth, D.C.; Sekot, J.P.; Skinner, K.L.

    1993-04-01

    A conceptual design study was prepared that: (1) reviewed the operations necessary to perform the mechanical disassembly of Fort St. Vrain fuel elements; (2) contained a description and survey of equipment capable of performing the necessary functions; and (3) performed a tradeoff study for determining the preferred concepts and equipment specifications. A preferred system was recommended and engineering specifications for this system were developed

  15. Conceptual design report for the mechanical disassembly of Fort St. Vrain fuel elements

    Energy Technology Data Exchange (ETDEWEB)

    Lord, D.L. [Westinghouse Idaho Nuclear Co., Inc., Idaho Falls, ID (United States); Wadsworth, D.C.; Sekot, J.P.; Skinner, K.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1993-04-01

    A conceptual design study was prepared that: (1) reviewed the operations necessary to perform the mechanical disassembly of Fort St. Vrain fuel elements; (2) contained a description and survey of equipment capable of performing the necessary functions; and (3) performed a tradeoff study for determining the preferred concepts and equipment specifications. A preferred system was recommended and engineering specifications for this system were developed.

  16. 78 FR 4356 - Proposed Modification of the Dallas/Fort Worth Class B Airspace Area; TX

    Science.gov (United States)

    2013-01-22

    ... Dallas/Fort Worth International Airport (DFW) and Dallas Love Field Airport (DAL) within Class B airspace... acknowledge receipt of their comments on this action must submit with those comments a self-addressed, stamped... configuration has not kept pace with airport expansions and increasing operations and the current design makes...

  17. 75 FR 17691 - Foreign-Trade Zone 196 - Fort Worth, Texas, Application for Temporary/Interim Manufacturing...

    Science.gov (United States)

    2010-04-07

    ... (Cell Phone Kitting and Distribution), Fort Worth, Texas An application has been submitted to the... cell phones (HTSUS 8517.12, duty free) under T/IM procedures at its facility (152 employees, 186,000... 96% of the value of the finished product) include: cell phone batteries; cell phone chargers and...

  18. Evaluation of Eurasian Watermilfoil Control Techniques Using Aquatic Herbicides in Fort Peck Lake, Montana

    Science.gov (United States)

    2015-07-01

    Dredge Cut #2) are located immediately below Fort Peck Dam (Figure 4). The Dredge Cuts were formed by the excavation of soil for construction of the... Enviro -USA) consisted of 50, 6 m × 4.1 m deep sections. When sections were connected, a total length of 305 m was achieved. The top of the curtain was

  19. Implicit Trust in a Data Model

    Science.gov (United States)

    2011-10-01

    places familiarity as a sibling under understandability). Sheridan [5] proposed the following analogy to explain it: we are all familiar with people who...using the system agreeable ; essentially it suits their taste. Loving means the user has a strong preference for the system, is partial to using it, and...4] places explication of intention as a sibling under understanding, while others consider them independent. Sheridan [5] made the following

  20. Agriculture and Rural Development on Fort Hood Lands, 1849-1942: National Register Assessments of 710 Historic Archeological Properties

    National Research Council Canada - National Science Library

    Freeman, Martha

    2001-01-01

    In 1999, historians consulting with Prewitt & Associates, Inc., conducted archival research for the purpose of developing historic contexts relevant to the Fort Hood lands taken during the 1940s acquisition...

  1. Depressurization accident analyses for the Fort St. Vrain Reactor

    International Nuclear Information System (INIS)

    Paul, D.D.

    1976-01-01

    Design-basis depressurization accident analyses for the Fort St. Vrain reactor were performed using the FLODIS (Ref. 4) code. The FLODIS code models the active core, side reflector, gas annulus between the core barrel and the PCRV liner, and the PCRV cooling system. Results are presented for the Pelton circulators operating at 10,550, 8800, and 7000 rpm. Maximum temperatures of selected components are plotted as a function of time during the transient. None of the components studied exceeded the temperature at which failure or damage may occur. However, there must be sufficient mixing of the outlet gas in the lower plenum to insure the integrity of the steel liners of the steam generator inlet ducts

  2. Geologic map of the Fort Morgan 7.5' quadrangle, Morgan County, Colorado

    Science.gov (United States)

    Berry, Margaret E.; Taylor, Emily M.; Slate, Janet L.; Paces, James B.; Hanson, Paul R.; Brandt, Theodore R.

    2018-06-08

    The Fort Morgan 7.5′ quadrangle is located on the semiarid plains of northeastern Colorado, along the South Platte River corridor where the river has incised into Upper Cretaceous Pierre Shale. The Pierre Shale is largely covered by surficial deposits that formed from alluvial, eolian, and hillslope processes operating in concert with environmental changes from the late Pliocene to the present. The South Platte River, originating high in the Colorado Rocky Mountains, has played a major role in shaping surficial geology in the map area, which is several tens of kilometers downstream from where headwater tributaries join the river. Recurrent glaciation (and deglaciation) of basin headwaters has affected river discharge and sediment supply far downstream, influencing deposition of alluvium and river incision in the Fort Morgan quadrangle. Distribution and characteristics of the alluvial deposits indicate that during the Pleistocene the course of the river within the map area shifted progressively southward as it incised, and by late middle Pleistocene the river was south of its present position, cutting and filling a deep paleochannel near the south edge of the quadrangle. The river shifted back to the north during the late Pleistocene. Kiowa and Bijou Creeks are unglaciated tributaries originating in the Colorado Piedmont east of the Front Range that also have played a major role in shaping surficial geology of the map area. Periodically during the late Pleistocene, major flood events on these tributaries deposited large volumes of sediment at and near their confluences, forming a broad, low-gradient fan composed of sidestream alluvium that could have occasionally dammed the river for short periods of time. Wildcat Creek, also originating on the Colorado Piedmont, and the small drainage of Cris Lee Draw dissect the map area north of the river. Eolian sand deposits of the Sterling (north of river) and Fort Morgan (south of river) dune fields cover much of the

  3. Procedure for calculating estimated ultimate recoveries of wells in the Mississippian Barnett Shale, Bend Arch–Fort Worth Basin Province of north-central Texas

    Science.gov (United States)

    Leathers-Miller, Heidi M.

    2017-11-28

    In 2015, the U.S. Geological Survey published an assessment of technically recoverable continuous oil and gas resources of the Mississippian Barnett Shale in the Bend Arch–Fort Worth Basin Province of north-central Texas. Of the two assessment units involved in the overall assessment, one included a roughly equal number of oil wells and gas wells as classified by the U.S. Geological Survey’s standard of gas wells having production greater than or equal to 20,000 cubic feet of gas per barrel of oil and oil wells having production less than 20,000 cubic feet of gas per barrel of oil. As a result, estimated ultimate recoveries (EURs) were calculated for both oil wells and gas wells in one of the assessment units. Generally, only gas EURs or only oil EURs are calculated for an assessment unit. These EURs were calculated with data from IHS MarkitTM using DeclinePlus software in the Harmony interface and were a major component of the quantitative resource assessment. The calculated mean EURs ranged from 235 to 2,078 million cubic feet of gas and 21 to 39 thousand barrels of oil for various subsets of wells.

  4. Early and late Holocene glacial fluctuations and tephrostratigraphy, Cabin Lake, Alaska

    Science.gov (United States)

    Zander, Paul D.; Kaufman, Darrell S.; Kuehn, Stephen C.; Wallace, Kristi L.; Anderson, R. Scott

    2013-01-01

    Marked changes in sediment types deposited in Cabin Lake, near Cordova, Alaska, represent environmental shifts during the early and late Holocene, including fluctuations in the terminal position of Sheridan Glacier. Cabin Lake is situated to receive meltwater during periods when the outwash plain of the advancing Sheridan Glacier had aggraded. A brief early Holocene advance from 11.2 to 11.0 cal ka is represented by glacial rock flour near the base of the sediment core. Non-glacial lake conditions were restored for about 1000 years before the water level in Cabin Lake lowered and the core site became a fen. The fen indicates drier-than-present conditions leading up to the Holocene thermal maximum. An unconformity spanning 5400 years during the mid-Holocene is overlain by peat until 1110 CE when meltwater from Sheridan Glacier returned to the basin. Three intervals of an advanced Sheridan Glacier are recorded in the Cabin Lake sediments during the late Holocene: 1110–1180, 1260–1540 and 1610–1780 CE. The sedimentary sequence also contains the first five reported tephra deposits from the Copper River delta region, and their geochemical signatures suggest that the sources are the Cook Inlet volcanoes Redoubt, Augustine and Crater Peak, and possibly Mt Churchill in the Wrangell Volcanic field.

  5. Miniplate fixation of Le Fort I osteotomies.

    Science.gov (United States)

    Rosen, H M

    1986-12-01

    The use of rigid, internal, three-dimensional fixation using vitallium bone plates in 28 consecutive Le Fort I osteotomies is presented. A minimum follow-up period of 6 months was required for inclusion in this patient group. Maxillary movements included advancements (17), intrusions (9), lengthenings (5), and retrusions (2). The majority of maxillae were moved in more than one plane of space. Technical details, complications, and relapse potential are discussed. Advantages of rigid plate fixation include marked reductions in the length of intermaxillary fixation with light training elastics only. Immediate postoperative airway problems are thereby eliminated. Six months of follow-up would appear to indicate a low potential for osseous relapse when compared to wire osteosynthesis, regardless of the direction of maxillary movement. The major disadvantage is the decreased ability of postoperative orthodontics to move dento-osseous segments if skeletal occlusal disharmony persists postoperatively. For this reason, close attention to preoperative planning and operative technique is critical for the success of this fixation method.

  6. Tooth-borne distraction osteogenesis versus conventional Le Fort I in maxillary advancement of cleft lip and palate patients.

    Science.gov (United States)

    Jamilian, Abdolreza; Showkatbakhsh, Rahman; Behnaz, Mohammad; Ghassemi, Alireza; Kamalee, Zinat; Perillo, Letizia

    2018-01-31

    Distraction osteogenesis (DO) is rapidly becoming a mainstream surgical technique for correction of maxillary deficiency. The aim of this study was to compare the effectiveness of a newly designed tooth-borne osteogenic distraction device with conventional LeFort 1 osteotomy in maxillary advancement of cleft lip and palate patients. The DO group consisted of 10 subjects (7 males, 3 females) with a mean age of 21.2 (SD 4.2) years. In these patients, the newly designed distraction device which exerted force anteroposteriorly was cemented after mobilization of the maxilla. After a latency period of 7 days, the distractor was activated twice daily by a total amount of 0.5 mm per day. The activation was continued for 3 weeks. After an 8-week consolidation period, the distraction appliance was removed. Cephalograms of DO patients were obtained at the start of distraction and at the end of consolidation. The LeFort 1 group consisted of 11 subjects (6 males, 5 females) with a mean age of 22.3 (SD 3.7) years. Pre and post-surgery lateral cephalograms were obtained. T-Test and paired T-test were used to evaluate the data. At the end of treatment, the SNA angle of LeFort 1 patients increased by 5.5° (SD 2.3) (Pdistraction device can effectively advance the maxilla forward in patients with cleft lip.

  7. Final terms of reference for the Environmental Impact Assessment (EIA) report for the proposed Suncor Energy Inc., Project Millennium, Fort McMurray, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-04

    This document identifies the information that Suncor will need to prepare and submit as an Environmental Impact Assessment (EIA) report as part of its application to the Alberta Energy and Utilities Board for the construction, operation and reclamation of its proposed Millenium extension of the Steepbank Mine. The report must identify development activities, describe environmental effects, mitigation options and residual effects that are relevant to the assessment of the project. The report must also include a description of the processing facilities, mining activities, utilities and transportation. Similarly, the report must provide a full description of the environmental management systems in place, as well as details of the proposed management of air emissions, water, waste, hydrocarbons, and chemicals. The report will be made public to allow for participation from those who may be affected by the project. This includes residents and organizations in the Fort McMurray, Fort McKay, and Fort Chipewyan areas.

  8. Detailed workplan for innovative technology demonstrations to support existing treatment operations at the Installation Logistics Center, DSERTS Site FTLE-33, Fort Lewis, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Liikala, T.L.

    1998-07-01

    This workplan is an assemblage of documents for use by Pacific Northwest National Laboratory (PNNL) to direct and control project activities at Fort Lewis, Washington. Fort Lewis is a FORSCOM installation, whose Logistics Center (DSERTS Site FTLE-33) was placed on the National priorities List (NPL) in December 1989, as a result of trichloroethene (TCE) contamination in groundwater beneath the site. Site background information and brief descriptions of the Fort Lewis project and the main supporting documents, which will be used to direct and control the project activities, are provided. These are followed by a summary of the Work Breakdown Structure (WBS) elements, a general project schedule, a list of major deliverables, and a budget synopsis. Test plans for specific elements (Bench-Scale Testing) will be developed separately as those elements are initiated. If additional activities not specifically addressed in the Project Management Plan (Attachment 1) are added to the work scope, addendums to this workplan will be prepared to cover those activities.

  9. The Leavenworth Lamp: Symbol of the Command and General Staff College, Fort Leavenworth, Kansas, Presented 7 May 1956

    National Research Council Canada - National Science Library

    1956-01-01

    On the occasion of the 75th Anniversary of the founding of the Command and General Staff College, Fort Leavenworth, Kansas, on 7 May 1956, the "Leavenworth Lamp" was officially adopted by the College...

  10. Remedial Investigation/Baseline Risk Assessment for the Ravines and Beach Area Study areas of the Surplus Operable Unit, Fort Sheridan, Illinois, Volume 3 - BRA Text and BRA Appendices A-L

    Science.gov (United States)

    1998-04-13

    in quadriplegia (Ledet et al, 1973). For chickens , the lowest oral lethal dose of trivalent arsenic as arsenic trioxide and sodium arsenite reported...Benchmarks for Wildlife: 1996 Revision (ES/ER/TM-86/R3). The Original Value (mg/kg/day) for the Test Organism (rat, mouse, dove, chicken , duck) was... roasted coffee and in charcoal broiled, barbecued or smoked meats. It is also found in creosote, coal tar, petroleum asphalt, and a variety of

  11. Final Remedial Investigation/Baseline Risk Assessment for the Ravines and Beach Area Study of the Surplus Operable Unit, Fort Sheridan, Illinois. Volume 1: RI Text and RI Appendices A-I.

    Science.gov (United States)

    1998-04-13

    ecoCOPCs (laboratory or field studies) for impairment of amphibian reproductive success . • Measurement Endpoint 3— results of site-specific fathead...Date: \\C\\2\\ \\Q^ Jcalculator Used: ’"\\(-Q).Q Form: Lc )ADII IG Ikeas . Dev.: t-e-ica Balance Used: SP I S O Aquatic

  12. Precipitation and streamflow data from the Fort Carson Military Reservation and precipitation, streamflow, and suspended-sediment data from the Piñon Canyon Maneuver Site, Southeastern Colorado, 2008-2012

    Science.gov (United States)

    Brown, Christopher R.

    2014-01-01

    In 2013, the U.S. Geological Survey (USGS), in cooperation with the U. S. Department of the Army, compiled available precipitation and streamflow data for the years of 2008–2012 from the Fort Carson Military Reservation (Fort Carson) near Colorado Springs, Colo., and precipitation, streamflow, and suspended-sediment loads from the Piñon Canyon Maneuver Site (PCMS) near Trinidad, Colo. Graphical representations of the data presented herein are a continuation of work completed by the USGS in 2008 to gain a better understanding of spatial and temporal trends within the hydrologic data. Precipitation stations at Fort Carson and the PCMS were divided into groups based on their land-surface altitude (LSA) to determine if there is a spatial difference in precipitation amounts based on LSA for either military facility. Two-sample t-tests and Wilcoxon rank-sum tests indicated statistically significant differences exist between precipitation values at different groups for Fort Carson but not for the PCMS. All five precipitation stations at Fort Carson exhibit a decrease in median daily total precipitation from years 2002–2007 to 2008–2012. For the PCMS, median precipitation values decreased from the first study period to the second for the 13 stations monitored year-round except for Burson and Big Hills. Mean streamflow for 2008–2012 is less than mean streamflow for 1983–2007 for all stream-gaging stations at Fort Carson and at the PCMS. During the study period, each of the stream-gaging stations within the tributary channels at the PCMS accounted for less than three percent of the total streamflow at the Purgatoire River at Rock Crossing gage. Peak streamflow for 2008–2012 is less than peak streamflow for 2002–2007 at both Fort Carson and the PCMS. At the PCMS, mean suspended-sediment yield for 2008–2012 increased by 54 percent in comparison to the mean yield for 2002–2007. This increase is likely related to the destruction of groundcover by a series of

  13. Notes on Chameleons IV. A New Chameleon, from the Miocene of Fort Ternan, Kenya (Chamaeleonidae, Reptilia)

    NARCIS (Netherlands)

    Hillenius, D.

    1978-01-01

    A new, fossil chameleon is described, † Chamaeleo intermedius, found on the surface at Fort Ternan, Kenya. Most probably it eroded from a layer of fossilized lahar, close to 14 million years old. † Chamaeleo intermedius possesses characters which still occur in recent chameleons, in fact it combines

  14. Ansel Adams's Eucalyptus Tree, Fort Ross: Nature, Photography, and the Search for California

    OpenAIRE

    Adam Arenson

    2005-01-01

    This article considers the image of California evoked in the unusual Ansel Adams photograph Eucalyptus Tree, Fort Ross, California (1969), a Polaroid Land image of the garrison fence and an aged eucalyptus tree. Considering the participation of Russian occupation, Australian cross-pollination, Carleton Watkins's early photographs of redwoods, automotive and tourist images in the creation of this distinctive California place, the article argues that to understand Ansel Adams's work, we must no...

  15. Operational experience at Fort St. Vrain

    Energy Technology Data Exchange (ETDEWEB)

    Bramblett, G. C.; Fisher, C. R.; Swart, F. E. [General Atomic Co., San Diego, CA (USA)

    1981-01-15

    The Fort St. Vrain (FSV) station, a 330-MW(e) single reheat steam cycle powered by a high-temperature gas-cooled reactor (HTGR), is the first HTGR to enter commercial operation. Designed and built by General Atomic Company (GA), the plant is owned and operated by Public Service Company of Colorado (PSC). Many unique design features have been incorporated into this reactor system, including high-pressure helium as the primary system coolant, a graphite-moderated prismatic block core design, fission-product-containing carbide coatings on both fissile and fertile fuel particles, steam-driven helium circulators turning on water bearings, and once-through steam generators. All of these systems are contained in a prestressed concrete reactor vessel (PCRV). Extensive testing has been conducted during the rise to power following first criticality early in 1974 to verify system design performance. During this period, the plant has operated at power levels up to 70% and produced over one billion kilowatt hours of electricity. In 1979, the first refueling was conducted in conjunction with an extensive in-core inspection, the addition of in-core instrumentation, and a planned removal of a circulator for inspection.

  16. The Fort McMurray Demonstration Project in Social Marketing: no demonstrable effect on already falling injury rates following intensive community and workplace intervention.

    Science.gov (United States)

    Guidotti, Tee L; Deb, Pooja; Bertera, Robert; Ford, Lynda

    2009-10-01

    The Fort McMurray Demonstration Project in Social Marketing attempted to achieve mutually reinforcing effects from thematically coordinated educational and awareness efforts in the community as a whole and in the workplace and the inclusion of occupational safety within the framework of a community health promotion project. The study community was Fort McMurray, a small, industrial city in northern Alberta. The Mistahiai Health Region, several hundred kilometers to the west and also dominated by one city, Grande Prairie, served as the reference community. The intervention was based on media and events staged at public events, with supporting educational activities in schools and the community. It relied heavily on community-based partners and volunteers. Data on healthcare utilization of selected preventable injuries were obtained from Alberta Health for the time period 1990-1996 for the Regional Health Authorities of Northern Lights, where the only large population centre is Fort McMurray, and Mistahia. Age-adjusted aggregate injury rates were analyzed for evidence of an effect of the intervention. Severity was measured by proxy, using the number of diagnostic claims submitted for reimbursement for medical services in a given year. The communities differed in age-specific injury rates, with Fort McMurray showing higher rates for residents aged less than 55. Young adults and older adolescents showed higher levels of severity. Injury rates fell substantially and at similar rates in both communities over the five-year period. However, in both communities injury rates were already falling before the intervention in Fort McMurray began and continued to fall at about the same rate, slowing toward the end of the period. No evidence was found for an effect of the Project or for acceleration of the reduction in injury frequency in the intervention area. Over the period, fewer medical services were delivered in office settings and more in emergency rooms, in both

  17. Grønland som del af den bibelske fortælling - en 1700-tals studie

    DEFF Research Database (Denmark)

    Kjærgaard, Kathrine

    2010-01-01

     For missionærerne i Grønland som for de fleste andre i 1700-tallet var Bibelen en historisk sand fortælling om verden, der omfattede hele verdenshistorien fra Skabelsen til de sidste tider. Bibelen var ikke bare en sand historie om fortiden, den var også en sand historie om nutiden og om fremtid...

  18. Revisiting Pearson's climate and forest type studies on the Fort Valley Experimental Forest (P-53)

    Science.gov (United States)

    Joseph E. Crouse; Margaret M. Moore; Peter Z. Fule

    2008-01-01

    Five weather station sites were established in 1916 by Fort Valley personnel along an elevational gradient from the Experimental Station to near the top of the San Francisco Peaks to investigate the factors that controlled and limited forest types. The stations were located in the ponderosa pine, Douglas-fir, limber pine, Engelmann spruce, and Engelmann spruce/...

  19. Identification of Insect-Plant Pollination Networks for a Midwest Installation: Fort McCoy, WI

    Science.gov (United States)

    2016-04-01

    species are dependent on animal pollinators, including many agricultural plants (Ollerton et al. 2011). The recent declines of polli- nator species...pollinator fauna be- cause these species were absent from the Fort McCoy Integrated Natural Resources Management Plan. For general application of these...Conservation Status Ranks were used to classify species according to their vulnerability to extinction . Only species with Global Ranks of G1 (critically

  20. 75 FR 52733 - Record of Decision (ROD) for Fort Bliss Army Growth and Force Structure Realignment

    Science.gov (United States)

    2010-08-27

    ... decrease in certain quality of life indicators (e.g., traffic, air quality). The ROD, FEIS and other environmental documents are available on the Fort Bliss Web site ( http://www.bliss.army.mil ) or at the... (Stationing Action Alternative 4); land use changes that allow fixed site bivouac areas, mission support...

  1. 78 FR 27364 - Reorganization of Foreign-Trade Zone 241 Under Alternative Site Framework Fort Lauderdale, Florida

    Science.gov (United States)

    2013-05-10

    ... Zone 241 Under Alternative Site Framework Fort Lauderdale, Florida Pursuant to its authority under the...-48-2012, docketed 6/27/2012) for authority to reorganize under the ASF with a service area comprised... Everglades Customs and Border Protection port of entry, to modify Site 1 by removing acreage, to expand Sites...

  2. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Unit 2 (Docket No. 50-446)

    International Nuclear Information System (INIS)

    1992-09-01

    This document supplement 25 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Unit 2 (NUREG-0797), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, 21, 22, 23, and 24 to that report were published. This supplement deals primarily with Unit 2 issues; however, it also references evaluations for several Unit 1 licensing items resolved since Supplement 24 was issued

  3. 75 FR 39460 - Prevailing Rate Systems; Redefinition of the Chicago, IL; Fort Wayne-Marion, IN; Indianapolis, IN...

    Science.gov (United States)

    2010-07-09

    ...-AM21 Prevailing Rate Systems; Redefinition of the Chicago, IL; Fort Wayne-Marion, IN; Indianapolis, IN... wage area. These changes are based on recent consensus recommendations of the Federal Prevailing Rate... below. The Federal Prevailing Rate Advisory Committee (FPRAC), the national labor-management committee...

  4. Fort St. Vrain reactor performance and operation to full power

    International Nuclear Information System (INIS)

    Simon, W.A.; Bramblett, G.C.

    1982-01-01

    The Fort St. Vrain Nuclear Generating Station, powered by a high-temperature gas-cooled reactor (HTGR), has now been tested to full thermal power. Testing was conducted for the dual purposes of demonstrating component and system capability as a part of the rise-to-power program and determining core fluctuation/redistribution behavior under full power conditions. Both objectives were met. Full power performance of all major components and the achievement of nearly all design objectives has been verified. In addition, the tests showed that the fluctuation phenomenon has been corrected. Core region outlet temperature redistributions have been characterized, related to a physical mechanism, and shown to be inconsequential for overall plant operation

  5. Approach to the HTGR core outlet temperature measurements in the United States

    International Nuclear Information System (INIS)

    Franklin, R.; Rodriguez, C.

    1982-06-01

    The High Temperature Gas-Cooled Reactor (HTGR) constructed at Fort St. Vrain Colorado (330 MWe) used Geminol thermocouples to measure the primary coolant temperature at the core outlet. The primary coolant (helium) is heated by the graphite core to temperatures in the range of 700 deg. to 750 deg. C. The combination of the high temperature, high flow rate and radiation at the core outlet area makes it difficult to obtain accurate temperature measurements. The Geminol thermocouples installed in the Fort St. Vrain reactor have provided accurate data for several years of power operation without any failures. The indicated temperature of the core outlet thermocouples agrees with a ''traversing'' thermocouple measurement to within +-2 deg. C. The Geminol thermocouple wire was provided by the Driver-Harris Company and is similar to the chromel versus alumel thermocouple. Geminol wire is no longer distributed and on future designs, chromel versus alumel wire will be used. The next large HTGR design, which is being performed with funding support from the United States Department of Energy, will incorporate replaceable thermocouples. The thermocouples used in the Fort St. Vrain reactor were permanently installed and large in diameter (6.35 mm) to insure good reliability. The replaceable thermocouples to be used in the next large reactor will be smaller in diameter (3.18 mm). These replaceable thermocouples will be inserted into the core outlet area through long curved guide tubes that are permanently installed. These guide tubes are as long as 18 meters and must be curved to reach the core outlet regions. Tests were conducted to prove that the thermocouples could be inserted and removed through the long curved guide tubes. (author)

  6. Demonstration of Thermally Sprayed Metal and Polymer Coatings for Steel Structures at Fort Bragg, NC

    Science.gov (United States)

    2017-09-01

    ER D C/ CE RL T R- 17 -3 0 DoD Corrosion Prevention and Control Program Demonstration of Thermally Sprayed Metal and Polymer Coatings...and Polymer Coatings for Steel Structures at Fort Bragg, NC Final Report on Project F07-AR10 Larry D. Stephenson, Alfred D. Beitelman, Richard G...5 2.1.2 Thermoplastic polymer coating (flame spray

  7. Fort St. Vrain hot functional test results

    International Nuclear Information System (INIS)

    Phelps, R.D.

    1974-01-01

    A description is given of Fort St. Vrain hot functional tests performed to evaluate the initial nonnuclear performance of the primary coolant system and the associated effects on the various internal components of the reactor vessel and primary coolant system. The components included the twelve steam generator modules, the four helium circulators, the PCRV thermal barrier and liner coolant system, the helium purification system, and the primary and secondary closures at each of the PCRV penetrations. Additional objectives included analysis of the parallel operation of the four helium circulators and the performance of several circulator start/stop transients under various conditions of primary coolant temperature and pressure. Vibration and acoustical phenomena within the vessel were measured, recorded, and compared to theoretical analyses; a verification of reverse flow in the shutdown loop steam generator during one loop operation was performed; the PCRV was again observed for its structural response to internal pressure; and comparisons were made relative to data recorded during the initial pressure test completed in July 1971. (U.S.)

  8. Territoriality of feral pigs in a highly persecuted population on Fort Benning, Georgia

    Science.gov (United States)

    Sparklin, B.D.; Mitchell, M.S.; Hanson, L.B.; Jolley, D.B.; Ditchkoff, S.S.

    2009-01-01

    We examined home range behavior of female feral pigs (Sus scrofa) in a heavily hunted population on Fort Benning Military Reservation in west-central Georgia, USA. We used Global Positioning System location data from 24 individuals representing 18 sounders (i.e., F social groups) combined with markrecapture and camera-trap data to evaluate evidence of territorial behavior at the individual and sounder levels. Through a manipulative experiment, we examined evidence for an inverse relationship between population density and home range size that would be expected for territorial animals. Pigs from the same sounder had extensive home range overlap and did not have exclusive core areas. Sounders had nearly exclusive home ranges and had completely exclusive core areas, suggesting that female feral pigs on Fort Benning were territorial at the sounder level but not at the individual level. Lethal removal maintained stable densities of pigs in our treatment area, whereas density increased in our control area; territory size in the 2 areas was weakly and inversely related to density of pigs. Territorial behavior in feral pigs could influence population density by limiting access to reproductive space. Removal strategies that 1) match distribution of removal efforts to distribution of territories, 2) remove entire sounders instead of individuals, and 3) focus efforts where high-quality food resources strongly influence territorial behaviors may be best for long-term control of feral pigs.

  9. Le fort I osteotomy approach for advanced nasopharyngeal angiofibroma with intracranial extension: Report of a case

    Directory of Open Access Journals (Sweden)

    "Naraghi M

    2002-08-01

    Full Text Available Angiofibromas are the most common benign tumors of the nasopharynx, Intracranial extension has been reported in approximately 20-25% of cases. Intracranial extension may be difficult to treat because of poor exposure that may lead to recurrence. A 16-year-old male patient presented with a 6-month history of nasal obstruction, intermittent epistaxis, right superior orbital fissure syndrome, and proptosis. Imaging studies revealed a large right sinonasal mass with significant intracranial and infratemporal extensions. The tumor was resected by Le fort I technique because of dissatisfaction with other approaches. Postoperative period was uneventful and follow-up visits showed marked improvement in proptosis and ophthalmologic symptoms, without the evidence of tumor recurrence. Commonly used to treat facial deformities. The Le Fort I osteotomy with down fracturing of the entire palate has been adopted as a surgical option in the management of some angiofibromas. Compared with other popular techniques, it provides excellent exposure for angiofibromas. The merits and limitations of this approach as well as its details are discussed.

  10. Fort Cochin in Kerala 1750-1830 : the social condition of a Dutch community in an Indian milieu

    NARCIS (Netherlands)

    Singh, Anjana

    2007-01-01

    Focussing on individuals and institutions, the economic and social condition of the people of Fort Cochin between 1781 and 1830 has been studied. This study of the Dutch East India Company's (VOC) establishment on the south west coast of India provides a detailed research into the functioning of the

  11. Test and evaluation of the Fort St. Vrain dew point moisture monitor system

    International Nuclear Information System (INIS)

    Block, G.A.; Del Bene, J.V. Jr.; Gitterman, M.; Hastings, G.A.; Hawkins, W.M.; Hinz, R.F.; McCue, D.E.; Swanson, L.L.; Vavrina, J.; Zwetzig, G.B.

    1975-01-01

    Descriptions are given of the Fort St. Vrain Dew Point Moisture Monitor (DPMM) System; the bases for the DPMM system response time requirements for safety related functions at the required reactor operating conditions; the results and evaluation of recent testing which measured the performance of the current system at simulated operating conditions; predicted response times for reactor power operation from 0 to 100 percent and a modification to provide improved response times for low-load and plant start-up conditions

  12. Arsenic Fate, Transport And Stability Study: Groundwater, Surface Water, Soil And Sediment Investigation At Fort Devens Superfund Site

    Science.gov (United States)

    A field investigation was conducted to examine the distribution of arsenic in groundwater, surface water, and sediments at the Fort Devens Superfund Site. The study area encompassed a portion of plow Shop Pond (Red Cove), which receives groundwater discharge from the aquifer und...

  13. Preliminary assessment report for National Guard Training Center, Georgia Army National Guard, Fort Stewart, Georgia

    International Nuclear Information System (INIS)

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Georgia Army National Guard (GAARNG) facility near Hinesville, Georgia, known as the National Guard Training Center (NGTC). Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a priority basis for completing corrective actions (where necessary) in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining previous site activities, types and quantities of hazardous substances utilized, and potential pathways by which contamination could affect public health and the environment. The scope of this assessment is limited to the facilities and past activities contained within the NGTC. Preliminary assessment site score sheet information is also provided for the NGTC. However, this assessment report is intended to be read in conjunction with a previous IRP assessment of Fort Stewart completed in 1992 (USATHAMA 1992) and to provide comprehensive information on the NGTC area for incorporation with information contained in that previous assessment for the entirety of Fort Stewart

  14. Summary and abstracts from Sudden Aspen Decline (SAD) Meeting; Fort Collins, Colorado, February 12-13, 2008

    Science.gov (United States)

    Paul C. Rogers

    2008-01-01

    In recent years the aspen research and management community has witnessed increasing accounts of unexplained aspen die-offs across the Rocky Mountain region. In response, two meetings were held to address the issue; this paper summarizes the most recent gathering, a symposium held in Fort Collins at the USDA Forest Service, Rocky Mountain Research Station, on February...

  15. Brugerdrevne standarder og pædagogisk ledelse: Skræddersyede teknikker eller prototypiske fortællinger

    DEFF Research Database (Denmark)

    Nissen, Morten

    2016-01-01

    brugerdrevne. Derfra udvides billedet til mere og mere omfattende og udfordrende udgaver, og de principielle spørgsmål og perspektiver, som de rejser, bl.a. om prototypiske fortællinger og anerkendelse. Så får jeg samtidig fortalt om nogle af de pædagogiske praksisser og fællesskaber, som jeg har studeret. Til...

  16. Fort St. Vrain fuel-handling system RAM analysis

    International Nuclear Information System (INIS)

    Azizi, S.M.; Berg, G.E.; Burton, J.H.; Durand, R.E.; Larson, E.M.; Pepe, D.J.; Rutherford, P.D.; Novachek, F.J.

    1989-01-01

    Public Service of Company of Colorado (PSC) is planning to decommission its Fort St. Vrain plant in 1990. This requires removal of 1,500 separate assemblies from the core. With the low historical availability of the fuel-handling system (FHS), defueling time was estimated at 36 months. With plant expenses of approximately $1.6 million per month during defueling, this would mean a schedule cost of $58 million. With their contractor, Rockwell International, PSC embarked on a reliability, availability, and maintainability (RAM) analysis to reduce projected defueling time. Key elements included (a) estimating availability of the FHS using a limited historical record, (b) assessing the defueling critical path, and (c) proposing and evaluating design/operational improvements. The most cost-effective improvements are being implemented and are expected to provide a reduction of >18 months in schedule and a net savings of $20 to 25 million. The paper describes the FHS design and operation, major problems associated with fuel-handling operations, and results and recommendations

  17. Failure of Fort St. Vrain 347SS control rod drive cables

    International Nuclear Information System (INIS)

    Hellner, R.L.; Thurgood, B.E.

    1990-01-01

    This paper reports on Fort St. Vrain (FSV) which is a high temperature gas cooled reactor. During a scheduled surveillance exercise, one of the control rod drives failed to operate properly. It was found that one of the 347 austenitic stainless cables had failed at several locations and the other had a broken strand. Metallurgical examination determined that the cables failed due to chloride stress corrosion cracking. An investigation into the source of chlorides determined that materials within the core could release chlorides either by water leaching or heat up. To prevent future failures, all the stainless control cables were replaced with cables fabricated from inconel 625

  18. Equipment for nondestructive evaluation of the strength of the Fort St. Vrain core-support blocks

    International Nuclear Information System (INIS)

    Morgan, W.C.; Prince, J.M.; Posakony, G.J.

    1982-09-01

    A novel sweep-frequency eddy current instrument has been constructed for measuring density-depth profiles in oxidized graphite. Development work on additional parts of the instrumentation package, that was to be tested in the Fort St. Vrain High Temperature Gas-Cooled Reactor, has been temporarily halted. This report documents the work which has been accomplished to date and presents the current status of the equipment development effort

  19. Analysis of natural gas supply strategies at Fort Drum

    International Nuclear Information System (INIS)

    Stucky, D.J.; Shankle, S.A.; Anderson, D.M.

    1992-07-01

    This analysis investigates strategies for Fort Drum to acquire a reliable natural gas supply while reducing its gas supply costs. The purpose of this study is to recommend an optimal supply mix based on the life-cycle costs of each strategy analyzed. In particular, this study is intended to provide initial guidance as to whether or not the building and operating of a propane-air mixing station is a feasible alternative to the current gas acquisition strategy. The analysis proceeded by defining the components of supply (gas purchase, gas transport, supplemental fuel supply); identifying alternative options for each supply component; constructing gas supply strategies from different combinations of the options available for each supply component and calculating the life-cycle costs of each supply strategy under a set of different scenarios reflecting the uncertainty of future events

  20. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Unit 2 (Docket No. 50-446)

    International Nuclear Information System (INIS)

    1993-02-01

    Supplement 26 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Unit 2, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, 21, 22, 23, 24, and 25 to that report were published. This supplement deals primarily with Unit 2 issues; however, it also references evaluations for several licensing issues that relate to Unit 1, which have been resolved since Supplement 25 was issued

  1. Slip Potential of Faults in the Fort Worth Basin

    Science.gov (United States)

    Hennings, P.; Osmond, J.; Lund Snee, J. E.; Zoback, M. D.

    2017-12-01

    Similar to other areas of the southcentral United States, the Fort Worth Basin of NE Texas has experienced an increase in the rate of seismicity which has been attributed to injection of waste water in deep saline aquifers. To assess the hazard of induced seismicity in the basin we have integrated new data on location and character of previously known and unknown faults, stress state, and pore pressure to produce an assessment of fault slip potential which can be used to investigate prior and ongoing earthquake sequences and for development of mitigation strategies. We have assembled data on faults in the basin from published sources, 2D and 3D seismic data, and interpretations provided from petroleum operators to yield a 3D fault model with 292 faults ranging in strike-length from 116 to 0.4 km. The faults have mostly normal geometries, all cut the disposal intervals, and most are presumed to cut into the underlying crystalline and metamorphic basement. Analysis of outcrops along the SW flank of the basin assist with geometric characterization of the fault systems. The interpretation of stress state comes from integration of wellbore image and sonic data, reservoir stimulation data, and earthquake focal mechanisms. The orientation of SHmax is generally uniform across the basin but stress style changes from being more strike-slip in the NE part of the basin to normal faulting in the SW part. Estimates of pore pressure come from a basin-scale hydrogeologic model as history-matched to injection test data. With these deterministic inputs and appropriate ranges of uncertainty we assess the conditional probability that faults in our 3D model might slip via Mohr-Coulomb reactivation in response to increases in injected-related pore pressure. A key component of the analysis is constraining the uncertainties associated with each of the principal parameters. Many of the faults in the model are interpreted to be critically-stressed within reasonable ranges of uncertainty.

  2. Fort Huachuca to Benefit from New Solar Technology: Dish-Stirling System Couples Solar Power with Engine to Generate Electricity

    National Research Council Canada - National Science Library

    1995-01-01

    ... in partnership with industry. A prototype dish-Stirling solar system, which consists of a large dish of solar concentrators and a Stirling heat engine, will be installed at Fort Huachuca in July and should be in operation about two weeks later...

  3. Geohydrologic units and water-level conditions in the Terrace alluvial aquifer and Paluxy Aquifer, May 1993 and February 1994, near Air Force Plant 4, Fort Worth area, Texas

    Science.gov (United States)

    Rivers, Glen A.; Baker, Ernest T.; Coplin, L.S.

    1996-01-01

    The terrace alluvial aquifer underlying Air Force Plant 4 and the adjacent Naval Air Station (formerly Carswell Air Force Base) in the Fort Worth area, Texas, is contaminated locally with organic and metal compounds. Residents south and west of Air Force Plant 4 and the Naval Air Station are concerned that contaminants might enter the underlying Paluxy aquifer, which provides water to the city of White Settlement, south of Air Force Plant 4, and to residents west of Air Force Plant 4. The U.S. Environmental Protection Agency has qualified Air Force Plant 4 for Superfund cleanup. The pertinent geologic units include -A~rom oldest to youngest the Glen Rose, Paluxy, and Walnut Formations, Goodland Limestone, and terrace alluvial deposits. Except for the Glen Rose Formation, all units crop out at or near Air Force Plant 4 and the Naval Air Station. The terrace alluvial deposits, which nearly everywhere form the land surface, range from 0 to about 60 feet thick. These deposits comprise a mostly unconsolidated mixture of gravel, sand, silt, and clay. Mudstone and sandstone of the Paluxy Formation crop out north, west, and southwest of Lake Worth and total between about 130 and about 175 feet thick. The terrace alluvial deposits and the Paluxy Formation comprise the terrace alluvial aquifer and the Paluxy aquifer, respectively. These aquifers are separated by the Goodland-Walnut confining unit, composed of the Goodland Limestone and (or) Walnut Formation. Below the Paluxy aquifer, the Glen Rose Formation forms the Glen Rose confining unit. Water-level measurements during May 1993 and February 1994 from wells in the terrace alluvial aquifer indicate that, regionally, ground water flows toward the east-southeast beneath Air Force Plant 4 and the Naval Air Station. Locally, water appears to flow outward from ground-water mounds maintained by the localized infiltration of precipitation and reportedly by leaking water pipes and sanitary and (or) storm sewer lines beneath the

  4. Trace element, semivolatile organic, and chlorinated organic compound concentrations in bed sediments of selected streams at Fort Gordon, Georgia, February-April 2010

    Science.gov (United States)

    Thomas, Lashun K.; Journey, Celeste A.; Stringfield, Whitney J.; Clark, Jimmy M.; Bradley, Paul M.; Wellborn, John B.; Ratliff, Hagan; Abrahamsen, Thomas A.

    2011-01-01

    A spatial survey of streams was conducted from February to April 2010 to assess the concentrations of major ions, selected trace elements, semivolatile organic compounds, organochlorine pesticides, and polychlorinated biphenyls associated with the bed sediments of surface waters at Fort Gordon military installation near Augusta, Georgia. This investigation expanded a previous study conducted in May 1998 by the U.S. Geological Survey, in cooperation with the U.S. Department of the Army Environmental and Natural Resources Management Office of the U.S. Army Signal Center and Fort Gordon, that evaluated the streambed sediment quality of selected surface waters at Fort Gordon. The data presented in this report are intended to help evaluate bed sediment quality in relation to guidelines for the protection of aquatic life, and identify temporal trends in trace elements and semivolatile organic compound concentrations at streambed sites previously sampled. Concentrations of 34 major ions and trace elements and 102 semivolatile organic, organochlorine pesticide, and polychlorinated biphenyl compounds were determined in the fine-grained fraction of bed sediment samples collected from 13 of the original 29 sites in the previous study, and 22 additional sites at Fort Gordon. Three of the sites were considered reference sites as they were presumed to be located away from potential sources of contaminants and were selected to represent surface waters flowing onto the fort, and the remaining 32 nonreference sites were presumed to be located within the contamination area at the fort. Temporal trends in trace elements and semivolatile organic compound concentrations also were evaluated at 13 of the 32 nonreference sites to provide an assessment of the variability in the number of detections and concentrations of constituents in bed sediment associated with potential sources, accumulation, and attenuation processes. Major ion and trace element concentrations in fine-grained bed

  5. FLODIS: a computer model to determine the flow distribution and thermal response of the Fort St. Vrain reactor

    Energy Technology Data Exchange (ETDEWEB)

    Paul, D.D.

    1976-06-01

    FLODIS is a combined heat transfer and fluid flow analysis calculation written specifically for the core of the Fort St. Vrain reactor. It is a lumped-node representation of the 37 refueling regions in the active core. Heat conduction to the coolant and in the axial direction is represented; however, the effect of conduction between refueling regions is not included. The calculation uses the specified operating conditions for the reactor at power to determine appropriate loss coefficients for the variable orifices in each refueling region. Flow distributions following reactor trip and a reduction in coolant pressure and flow are determined assuming that the orifice coefficients remain constant. Iterative techniques are used to determine the distribution of coolant flow as a function of time during the transient. Results are presented for the evaluation of the transient for the Fort St. Vrain reactor following depressurization and cooling with two circulators operating at 8000 rpm.

  6. FLODIS: a computer model to determine the flow distribution and thermal response of the Fort St. Vrain reactor

    International Nuclear Information System (INIS)

    Paul, D.D.

    1976-06-01

    FLODIS is a combined heat transfer and fluid flow analysis calculation written specifically for the core of the Fort St. Vrain reactor. It is a lumped-node representation of the 37 refueling regions in the active core. Heat conduction to the coolant and in the axial direction is represented; however, the effect of conduction between refueling regions is not included. The calculation uses the specified operating conditions for the reactor at power to determine appropriate loss coefficients for the variable orifices in each refueling region. Flow distributions following reactor trip and a reduction in coolant pressure and flow are determined assuming that the orifice coefficients remain constant. Iterative techniques are used to determine the distribution of coolant flow as a function of time during the transient. Results are presented for the evaluation of the transient for the Fort St. Vrain reactor following depressurization and cooling with two circulators operating at 8000 rpm

  7. Biology and ecology of sickleweed (Falcaria vulgaris) in the Fort Pierre National Grassland of South Dakota

    Science.gov (United States)

    Brian L. Korman

    2011-01-01

    In the last two decades the exotic plant sickleweed (Falcaria vulgaris Bernh., Apiaceae) has invaded, and come to dominate, large areas of the Fort Pierre National Grassland (FPNG) in central South Dakota, USA. Currently sickleweed is estimated to infest over 3200 ha of FPNG. The purpose of this study was to examine several of the biological and ecological traits that...

  8. Inicial nasal mucosa detachment using piezoelectric device in the Le Fort I osteotomy: A technical note

    OpenAIRE

    Shinohara, Elio Hitoshi; Kaba, Shajadi Carlos Pardo; Ruiz, Marcelo Martinson; Horikawa, Fernando Kendi

    2013-01-01

    In maxillary Le Fort I type osteotomy the detachment of the nasal mucosa should be done carefully. Piezoelectric surgery contributed much to increase the safety of osteotomies, despite the initial advantage of minimizing the risk of injury in nervous tissue, mainly in bilateral sagittal split osteotomy; we use the piezoelectric device for the initial detachment of the nasal mucosa in the maxillary osteotomy.

  9. The Effects of Tactical Vehicle Training on the Lands of Fort Carson, Colorado. An Ecological Assessment.

    Science.gov (United States)

    1984-12-01

    p P 28 Table 10 (Cont’d) Fort Carson PJC PJT PC PT Species %C %F %C %F %C %F %C %F Muhlenbergia torreyi P .32 .71 3.45 8.70 2.10 3.00 Oenothera ...look pinkish-white from the flowers of evening primrose ( Oenothera albicaulis) that have invaded the S tracked areas. Other disturbance-related forbs are

  10. 78 FR 37527 - Draft Environmental Impact Statement for the Disposition of Hangars 2 and 3, Fort Wainwright, Alaska

    Science.gov (United States)

    2013-06-21

    ... Statement (EIS) for the disposition of two historic hangars at Fort Wainwright (FWA). The Draft EIS analyzes and evaluates the potential environmental impacts associated with proposed disposition options for two historic World War II-era hangars (Hangars 2 and 3) and supporting infrastructure located on the Main Post...

  11. 75 FR 27996 - Record of Decision (ROD) for the Training Land Acquisition (Including Purchase and Lease) at Fort...

    Science.gov (United States)

    2010-05-19

    ... DEPARTMENT OF DEFENSE Department of the Army Record of Decision (ROD) for the Training Land Acquisition (Including Purchase and Lease) at Fort Polk, LA AGENCY: Department of the Army, DoD. ACTION... which summarizes and documents its decision to proceed with Alternative 3, the acquisition of up to 100...

  12. Military Adjustment Units (MAU) Fort Bliss, Texas and Fort Jackson, South Carolina

    Science.gov (United States)

    1981-12-08

    for those not prepared for training. It allows the trainer, given proper guidance about deficiencies, to help fill in the gaps in knowledge ...Why You’re Needed", discuss with students the importance of "the role they play in the US Army, and how their efforts, abilities and knowledge can be...34Weari ng. of the Uniform", "Mirror, Mirror." DAY II - "Correctional Treatment", "Heritage of the Soldier." DAY III - "Tale of Two Skiers ." 22 APPENDIX

  13. Nasomaxillary hypoplasia with a congenitally missing tooth treated with LeFort II osteotomy, autotransplantation, and nickel-titanium alloy wire.

    Science.gov (United States)

    Ishida, Takayoshi; Ikemoto, Shigehiro; Ono, Takashi

    2015-09-01

    In some skeletal Class III adult patients with nasomaxillary hypoplasia, the LeFort I osteotomy provides insufficient correction. This case report describes a 20-year-old woman with a combination of nasomaxillary hypoplasia and a protrusive mandible with a congenitally missing mandibular second premolar. We performed a LeFort II osteotomy for maxillary advancement. Autotransplantation of a tooth was also performed; the donor tooth was used to replace the missing permanent tooth. To increase the chance of success, we applied light continuous force with an improved superelastic nickel-titanium alloy wire technique before extraction and after transplantation. The patient's profile and malocclusion were corrected, and the autotransplanted tooth functioned well. The postero-occlusal relationships were improved, and ideal overbite and overjet relationships were achieved. The methods used in this case represent a remarkable treatment. Copyright © 2015 American Association of Orthodontists. Published by Elsevier Inc. All rights reserved.

  14. Computerized training program usage at the Fort Calhoun Nuclear Power Station

    International Nuclear Information System (INIS)

    Ruzic, D.H.; Reed, W.H.; Lawton, R.K.; Fluehr, J.J.

    1987-01-01

    The increased US Nuclear Regulatory Commission and Institute of Nuclear Power Operations (INPO) interest in the nuclear power industry training programs resulted in the Omaha Public Power District staff at the Fort Calhoun Nuclear Power Station investigating the potential for computerizing their recently accredited training records, student training requirements, and the process of determining student certification status. Additional areas that were desirable were a computerized question data bank with random test generation, maintaining history of question usage, and tracking of the job task analysis process and course objectives. SCI Software's online personnel training information management system (OPTIM) was selected, subsequent to a bid evaluation, to provide these features while operating on the existing corporate IBM mainframe

  15. Le traité de Fort Jackson, 9 août 1814

    Directory of Open Access Journals (Sweden)

    Jean‑Marc Serme

    2006-04-01

    Full Text Available This paper aims to show the motives and goals of the different actors of the War of 1812 as expressed through the Muscogee Creek War (1813‑1814. The fate of the region was sealed when a gigantic land cession was conceded by Native Americans in the Treaty of Fort Jackson. Aug.9, 1814, symbolizes both the end of Native American clout in the Old Southwest and the beginning of a new era in Southern history. Andrew Jackson played a key‑role in this shift in power. Other individuals, but also social groups and entire nations were involved in a complex web of relationships and cultural, political and economic conflicts.

  16. Fort St. Vrain graphite site mechanical separation concept selection

    International Nuclear Information System (INIS)

    Berry, S.M.

    1993-09-01

    One of the alternatives to the disposal of the Fort St. Vrain (FSV) reactor spent nuclear fuel involves the separation of the fuel rods composed of compacts from the graphite fuel block assembly. After the separation of these two components, the empty graphite fuel blocks would be disposed of as a low level waste (provided the appropriate requirements are met) and the fuel compacts would be treated as high level waste material. This report deals with the mechanical separation aspects concerning physical disassembly of the FSV graphite fuel element into the empty graphite fuel blocks and fuel compacts. This report recommends that a drilling technique is the preferred choice for accessing the, fuel channel holes and that each hole is drilled separately. This report does not cover any techniques or methods to separate the triso fuel particles from the graphite matrix of the fuel compacts

  17. Decision 99-8 : Shell Canada Limited application to construct and operate an oil sands bitumen upgrader in the Fort Saskatchewan area : Shell Canada Products Limited application to amend refinery approval in the Fort Saskatchewan area

    International Nuclear Information System (INIS)

    1999-01-01

    The Alberta Energy and Utilities Board considered an application by Shell Canada Limited to construct and operate an oil sands bitumen upgrader on Shell's property adjoining the existing Scotford refinery in the County of Strathcona. The upgrader would process bitumen from Shell's proposed Muskeg River Mine, located 70 km north of Fort McMurray, and other feedstocks available in the area. The Board also considered an application for an amendment to the existing Scotford refinery approval, Industrial Development Permit 89-10, for the processing of 3.75 million cubic metres per year of sour conversion feedstock. Under a coordinated application process, Shell filed a joint Shell Scotford Upgrader application/Environmental Impact Assessment. Issues considered with respect to these applications were: technology selection, air/health, sulphur recovery, noise/traffic, and land use conflict. Shell stated that its Scotford refinery is the most energy efficient refinery in the Americas and that is has the highest liquid yield per unit volume of crude oil feedstock of any refinery in the world. The refinery's hydrocracking capacity would make it possible to use hydro-conversion technology for its upgrader which is environmentally advantageous. After examining all of the evidence pertaining to the applications, the Board found the projects to be in the public interest and is prepared to approve the Scotford Upgrader and Scotford Refinery modifications assuming that certain prescribed conditions are met

  18. [The regulation of microecological disorders of the intestines in newborn infants with perinatal pathology using the new probiotic bifidumbacterin-forte].

    Science.gov (United States)

    Iakushenko, M N; Tkhagapsoeva, Zh M; Bondarenko, V M

    1997-01-01

    The study was made on 93 newborn infants with perinatal pathology, among them infants with the perinatal lesion of the central nervous system (52), hemolytic disease of newborns (19) and conjugation jaundice (12). All newborn infants were examined for the presence of intestinal microflora in its dynamics and for the state microbiocenosis, evaluated by the rapid method based on the determination of the caseinolytic activity of fecal supernatants after the correction of normal flora with bifidumbacterin in 55 infants and with bifidumbacterin-forte in 38 infants. The comparative study of these two preparations revealed that the use of probiotics containing Bifidobacterium bifidum was mainly substitutional, promoting the colonization of the intestine by lactobacteria, which later determined the suppression opportunistic microflora. The effectiveness of bifidumbacterin-forte containing live B. bifidum, immobilized on sorbent, proved to be most pronounced.

  19. Ecological restoration experiments (1992-2007) at the G.A. Pearson Natural Area, Fort Valley Experimental Forest (P-53)

    Science.gov (United States)

    Margaret M. Moore; Wallace Covington; Peter Z. Fulé; Stephen C. Hart; Thomas E. Kolb; Joy N. Mast; Stephen S. Sackett; Michael R. Wagner

    2008-01-01

    In 1992 an experiment was initiated at the G. A. Pearson Natural Area on the Fort Valley Experimental Forest to evaluate long-term ecosystem responses to two restoration treatments: thinning only and thinning with prescribed burning. Fifteen years of key findings about tree physiology, herbaceous, and ecosystem responses are presented.

  20. First records of two species of mammals in the Huachuca Mountains: results of ecological stewardship at Fort Huachuca

    Science.gov (United States)

    Ronnie Sidner; H. Sheridan Stone

    2005-01-01

    We report the first voucher of the cliff chipmunk (Neotamias dorsalis) and observations of Brazilian free-tailed bats (Tadarida brasiliensis) from the Huachuca Mountains, Arizona, where these species had not been documented. While presence of T. brasiliensis was expected on Fort Huachuca, N. dorsalis was a surprise after a century...

  1. Inicial nasal mucosa detachment using piezoelectric device in the Le Fort I osteotomy: A technical note

    Science.gov (United States)

    Shinohara, Elio Hitoshi; Kaba, Shajadi Carlos Pardo; Ruiz, Marcelo Martinson; Horikawa, Fernando Kendi

    2013-01-01

    In maxillary Le Fort I type osteotomy the detachment of the nasal mucosa should be done carefully. Piezoelectric surgery contributed much to increase the safety of osteotomies, despite the initial advantage of minimizing the risk of injury in nervous tissue, mainly in bilateral sagittal split osteotomy; we use the piezoelectric device for the initial detachment of the nasal mucosa in the maxillary osteotomy. PMID:23853472

  2. Inicial nasal mucosa detachment using piezoelectric device in the Le Fort I osteotomy: A technical note

    Directory of Open Access Journals (Sweden)

    Elio Hitoshi Shinohara

    2013-01-01

    Full Text Available In maxillary Le Fort I type osteotomy the detachment of the nasal mucosa should be done carefully. Piezoelectric surgery contributed much to increase the safety of osteotomies, despite the initial advantage of minimizing the risk of injury in nervous tissue, mainly in bilateral sagittal split osteotomy; we use the piezoelectric device for the initial detachment of the nasal mucosa in the maxillary osteotomy.

  3. Chitosan Dilutable and Dilactin Forte: Assessment of Their Efficiency for Safety and Quality of Foodstuff

    Science.gov (United States)

    Iurchikova, N.; Khlebosolova, O.

    2018-01-01

    The modern natural food preservatives used to process and store foodstuff allow to ensure its safety and high quality. Chitosan and dilactin-forte are among such medicines. These preservatives are not only safe, but also are beneficial to a human body in virtue of their effects onto human digestive system. The article describes the results of the research conducted to identify the impact of these natural preservatives on safety of carrot (Daucus carota subsp. sativus)

  4. Depositional environment of the Fort Member of the Jurasic Jaisalmer Formation (western Rajasthan, India), as revealed from lithofacies and grain-size analysis

    International Nuclear Information System (INIS)

    Ahmad, F.; Quasim, M.; Ghaznavi, A.; Khan, Z.; Ahmad, A.H.M.

    2017-01-01

    Lithofacies and granulometric analysis were carried out to decipher the depositional environment of the Fort Member of the Jurassic Jaisalmer Formation. Based on field data nine lithofacies have been identified including trough cross-bedded sandstones, planar cross-bedded sandstones, matrix supported conglomerates, thinly bedded siltstone and sandstones, herringbone cross-bedded sandstones, wave rippled sandstones, laminated sandstones, hummocky cross-bedded sandstones, limestones and shales. Granulometric analysis of the sandstones samples has been carried out for their statistical and textural parameters. Bivariant plots of textural parameters such as graphic skewness versus graphic standard deviation and kewness versus standard deviation confirm the high energy (beach) origin of sandstones. These results suggest a wide spectrum of marine environments ranging from inner shelf to upper shoreface for the Fort Member sandstones.

  5. Chemistry, toxicology, and persistence of particulates during and after the 2016 Fort McMurray Wildfires in Alberta, Canada

    Science.gov (United States)

    Kohl, L.; Chan, A. W. H.; Cooke, C. A.; Hustins, S.; Jackson, B.; Wang, S.; Jing, X.; Meng, M.

    2017-12-01

    The Horse River Fire in May 2016 forced the evacuation of 88,000 Fort McMurray residents, and led to the destruction of over 2000 houses. After re-entry to homes, there is significant concern about exposures to residual fire-derived contaminants in residential houses. Wildfire research, however, provides little guidance on how long ashes and pollutants persist in household dust after major fires. The FACET project studies the chemistry and toxicology of samples of urban and forest ashes and airborne particles collected during the fire, as well as over 500 house dust samples collected in July 2017 (14 months after the fire). Here we present results on the chemical composition of the urban and forest ash samples collected during the fire along with initial results from house dust samples. Wildfire ashes contained elevated concentrations of polycyclic aromatic hydrocarbons (PAH), heavy metals, and dioxin like compounds (DLC). Relative to EPA reference doses, As and Sb constitute the greatest non-carcinogenic health hazard, whereas PAHs Benzo(a)pyrene and Indeno(1,2,3-cd)pyrene are the most relevant carcinogens. Ashes from urban locations contained higher concentrations of heavy metals and DLC than samples collected from forested areas outside of the City of Fort McMurray. Urban samples furthermore had a greater potential for generating oxidative stress than rural samples, as determined by dithiothreitol (DTT) consumption assays. The oxidative potential was positively correlated to Al, Cu, As, and V concentrations. Airborne particulate matter samples from the smoke plume contained consistent concentrations of levoglucosan (99 ± 5 mg g-1), along with other tracers for biomass burning (free lignin monomers, retene). Together these results will serve as proxies for understanding the contribution and the persistence of fire-derived pollutants in house dust in Fort McMurray homes.

  6. NRHP Eligibility of the Fort Huachuca, Arizona, Elevated Water Tank (Facility 49001) and Reservoir (Facility 22020)

    Science.gov (United States)

    2016-08-01

    historic district. DISCLAIMER: The contents of this report are not to be used for advertising , publication, or promotional purposes. Citation of trade...district, Fort Huachuca Historic District, nestled in a valley overlooking the San Pedro River valley (Figure 1). The Army established Camp Huachuca in...designs serve a secondary advertising purpose (e.g., the water tower at the G. S. Suppiger catsup bottling plant in Collinsville, Illinois, Figure

  7. Contingent post-closure plan, hazardous waste management units at selected maintenance facilities, US Army National Training Center, Fort Irwin, California

    International Nuclear Information System (INIS)

    1992-01-01

    The National Training Center (NTC) at Fort Irwin, California, is a US Army training installation that provides tactical experience for battalion/task forces and squadrons in a mid- to high-intensity combat scenario. Through joint exercises with US Air Force and other services, the NTC also provides a data source for improvements of training doctrines, organization, and equipment. To meet the training and operational needs of the NTC, several maintenance facilities provide general and direct support for mechanical devices, equipment, and vehicles. Maintenance products used at these facilities include fuels, petroleum-based oils, lubricating grease, various degreasing solvents, antifreeze (ethylene glycol), transmission fluid, brake fluid, and hydraulic oil. Used or spent petroleum-based products generated at the maintenance facilities are temporarily accumulated in underground storage tanks (USTs), collected by the NTC hazardous waste management contractor (HAZCO), and stored at the Petroleum, Oil, and Lubricant (POL) Storage Facility, Building 630, until shipped off site to be recovered, reused, and/or reclaimed. Spent degreasing solvents and other hazardous wastes are containerized and stored on-base for up to 90 days at the NTC's Hazardous Waste Storage Facility, Building 703. The US Environmental Protection Agency (EPA) performed an inspection and reviewed the hazardous waste management operations of the NTC. Inspections indicated that the NTC had violated one or more requirements of Subtitle C of the Resource Conservation and Recovery Act (RCRA) and as a result of these violations was issued a Notice of Noncompliance, Notice of Necessity for Conference, and Proposed Compliance Schedule (NON) dated October 13, 1989. The following post-closure plan is the compliance-based approach for the NTC to respond to the regulatory violations cited in the NON

  8. 75 FR 55401 - Notice of Intent To Rule on Request To Release Airport Property at the Dallas/Fort Worth...

    Science.gov (United States)

    2010-09-10

    ... To Release Airport Property at the Dallas/Fort Worth International Airport, DFW Airport, TX AGENCY... airport property. SUMMARY: The FAA proposes to rule and invite public comment on the request for permanent... H. Ford Aviation Investment Reform Act for the 21st Century (AIR 21). DATES: Comments must be...

  9. 78 FR 9105 - Notice of Intent To Rule on Request To Release Airport Property at the Dallas/Fort Worth...

    Science.gov (United States)

    2013-02-07

    ... To Release Airport Property at the Dallas/Fort Worth International Airport, DFW Airport, TX AGENCY... Airport Property. SUMMARY: The FAA proposes to rule and invite public comment on the request for permanent... H. Ford Aviation Investment Reform Act for the 21st Century (AIR 21). DATES: Comments must be...

  10. History of the Fort Collins Science Center, U.S. Geological Survey

    Science.gov (United States)

    O'Shea, Thomas J. (compiler)

    2006-01-01

    The U.S. Geological Survey’s Fort Collins Science Center ("the Center") has been a nucleus of research, technology development, and associated scientific activities within the Department of the Interior for more than 30 years. The Center’s historical activities are deeply rooted in federal biological resources research and its supporting disciplines, particularly as they relate to the needs of the U.S. Department of the Interior and its resource management agencies. The organizational framework and activities of the Center have changed and adapted over the years in response to shifts in the scientific issues and challenges facing the U.S. Department of the Interior and with the development of new strategies to meet these challenges. Thus, the history of the Center has been dynamic.

  11. Effectiveness of adenoplex forte with or without heparegene as radioprotective and curative agent for controlling radiation induced hepatic metabolic dysfunction

    International Nuclear Information System (INIS)

    Mohamed, S.H.; EL-Sayed, N.M.; Hussein, A.M.

    2004-01-01

    The present work aims to evaluate the combined radioprotective and curative capacities of a known drug namely adenoplex forte [combination of adenosine tetraphosphate (ATP), co carboxylase, cyanocobalamin (Bn) and nicotinamide (vitamin P.P)] in dependency or in combination with heparegen [thiazolidine 4 -carboxylic acid] on liver metabolic processes of rats irradiated at 5 Gy. Therefore, the levels of plasma total lipids, triglycerides, total cholesterol, HDL-cholesterol and LDL-cholesterol were estimated as indicative parameters for lipid metabolism. Estimations of plasma glucose, pyruvate and lactate levels as well as liver glycogen content were employed as a useful means for testing the carbohydrate metabolism. The tested parameters were undertaken on 3, 7, 14, 21 and 30 days post-radiation exposure of rats to 5 Gy. Data of the present study revealed that exposure of rats to gamma irradiation at a dose level of 5 Gy was associated with disturbances in liver metabolic functions as reflected by alterations observed in all the tested parameters of both lipid and carbohydrate metabolism up to 30 days post-irradiation. The data further indicated that appropriate use of the selected drug adenoplex forte either independently or in combination with heparegen can preferentially modify liver metabolic disturbances induced by radiation exposure, which creates a therapeutic advantage in radiation therapy. In conclusion, this study suggest the potential use of adenoplex forte (with dose of 290 mg/kg) in combination with heparegen (with dose of 2 mg/kg) in patients receiving radiotherapy and suffering disturbed liver metabolic function mainly in carbohydrate and lipid metabolism

  12. Salamander chytrid fungus (Batrachochytrium salamandrivorans) in the United States—Developing research, monitoring, and management strategies

    Science.gov (United States)

    Grant, Evan H. Campbell; Muths, Erin L.; Katz, Rachel A.; Canessa, Stefano; Adams, Michael J.; Ballard, Jennifer R.; Berger, Lee; Briggs, Cheryl J.; Coleman, Jeremy; Gray, Matthew J.; Harris, M. Camille; Harris, Reid N.; Hossack, Blake R.; Huyvaert, Kathryn P.; Kolby, Jonathan E.; Lips, Karen R.; Lovich, Robert E.; McCallum, Hamish I.; Mendelson, Joseph R.; Nanjappa, Priya; Olson, Deanna H.; Powers, Jenny G.; Richgels, Katherine L. D.; Russell, Robin E.; Schmidt, Benedikt R.; Spitzen-van der Sluijs, Annemarieke; Watry, Mary Kay; Woodhams, Douglas C.; White, C. LeAnn

    2016-01-20

    The recently (2013) identified pathogenic chytrid fungus, Batrachochytrium salamandrivorans (Bsal), poses a severe threat to the distribution and abundance of salamanders within the United States and Europe. Development of a response strategy for the potential, and likely, invasion of Bsal into the United States is crucial to protect global salamander biodiversity. A formal working group, led by Amphibian Research and Monitoring Initiative (ARMI) scientists from the U.S. Geological Survey (USGS) Patuxent Wildlife Research Center, Fort Collins Science Center, and Forest and Rangeland Ecosystem Science Center, was held at the USGS Powell Center for Analysis and Synthesis in Fort Collins, Colorado, United States from June 23 to June 25, 2015, to identify crucial Bsal research and monitoring needs that could inform conservation and management strategies for salamanders in the United States. Key findings of the workshop included the following: (1) the introduction of Bsal into the United States is highly probable, if not inevitable, thus requiring development of immediate short-term and long-term intervention strategies to prevent Bsal establishment and biodiversity decline; (2) management actions targeted towards pathogen containment may be ineffective in reducing the long-term spread of Bsal throughout the United States; and (3) early detection of Bsal through surveillance at key amphibian import locations, among high-risk wild populations, and through analysis of archived samples is necessary for developing management responses. Top research priorities during the preinvasion stage included the following: (1) deployment of qualified diagnostic methods for Bsal and establishment of standardized laboratory practices, (2) assessment of susceptibility for amphibian hosts (including anurans), and (3) development and evaluation of short- and long-term pathogen intervention and management strategies. Several outcomes were achieved during the workshop, including development

  13. Analysis of Atmospheric Mercury and Associated Trace Gases in Dallas Fort Worth, TX (Barnett Shale area)

    Science.gov (United States)

    Laine, P. L.; Talbot, R. W.; Lefer, B. L.; Flynn, J. H.

    2012-12-01

    Throughout the month of June 2011, a variety of air quality measurements were obtained in the Dallas Fort Worth (Barnett Shale) field campaign. Species such as Hg0, O3, CO, NO, NO2, SO2 were monitored continuously along with a variety of volatile organic carbon (VOC) species ranging in size from C2 (ethane) to C9 aromatics to sesquiterpines. Mixed layer boundary heights were also monitored by Ceilometer measurements. At first glance, the mercury data has peaks that reach as high as 750 ppqv (parts per quadrillion by volume) which is approximately a 5 fold increase over the typical background values observed (~ 150 ppqv). The Fort Worth area has underlying Barnett Shale with thousands of natural gas compressor stations scattered throughout the surrounding landscape. We believe that a potential source of the elevated Hg0 is the result of leakage from these stations under the nocturnal boundary layer. A closer look at diurnal variations and backward wind trajectories will yield information pertaining to the types of air masses spanning the area. We will utilize the suite of chemical and meteorological measurements conducted during the campaign to facilitate source identification for specific time periods. Analysis of these data should provide new information on as yet unexplored sources of atmospheric mercury.

  14. Biological Assessment of the Effects of Military Associated Activities on Endangered Species at Fort Hood, Texas

    Science.gov (United States)

    1992-12-01

    monographing the genus Croton. Dr. Joe Allen Farmer published a dissertation on the species in 1962. Studies on the Fort Hood population have begun under...Woodhouse, S.W., "Descriptions of New Species of the Genus Vireo, VieilL, and Zonorrichia, Swains," Proceeding of the Academy of Natural Sciences of...sinuata Skunkbush Saumac Rhus aroma tica Texas Oak Quercus texazza Texas Persimmon, Diospyros texana Texas Ashe Fraxinus texensis Virginia Creeper Paz

  15. Land-Use Analysis and Simulated Effects of Land-Use Change and Aggregate Mining on Groundwater Flow in the South Platte River Valley, Brighton to Fort Lupton, Colorado

    Science.gov (United States)

    Arnold, L.R.; Mladinich, C.S.; Langer, W.H.; Daniels, J.S.

    2010-01-01

    Land use in the South Platte River valley between the cities of Brighton and Fort Lupton, Colo., is undergoing change as urban areas expand, and the extent of aggregate mining in the Brighton-Fort Lupton area is increasing as the demand for aggregate grows in response to urban development. To improve understanding of land-use change and the potential effects of land-use change and aggregate mining on groundwater flow, the U.S. Geological Survey, in cooperation with the cities of Brighton and Fort Lupton, analyzed socioeconomic and land-use trends and constructed a numerical groundwater flow model of the South Platte alluvial aquifer in the Brighton-Fort Lupton area. The numerical groundwater flow model was used to simulate (1) steady-state hydrologic effects of predicted land-use conditions in 2020 and 2040, (2) transient cumulative hydrologic effects of the potential extent of reclaimed aggregate pits in 2020 and 2040, (3) transient hydrologic effects of actively dewatered aggregate pits, and (4) effects of different hypothetical pit spacings and configurations on groundwater levels. The SLEUTH (Slope, Land cover, Exclusion, Urbanization, Transportation, and Hillshade) urban-growth modeling program was used to predict the extent of urban area in 2020 and 2040. Wetlands in the Brighton-Fort Lupton area were mapped as part of the study, and mapped wetland locations and areas of riparian herbaceous vegetation previously mapped by the Colorado Division of Wildlife were compared to simulation results to indicate areas where wetlands or riparian herbaceous vegetation might be affected by groundwater-level changes resulting from land-use change or aggregate mining. Analysis of land-use conditions in 1957, 1977, and 2000 indicated that the general distribution of irrigated land and non-irrigated land remained similar from 1957 to 2000, but both land uses decreased as urban area increased. Urban area increased about 165 percent from 1957 to 1977 and about 56 percent from

  16. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Lear, Jon [Ruby Mountain Inc., Salt Lake City, UT (United State); Bennett, Carlon [Ruby Mountain Inc., Salt Lake City, UT (United State); Lear, Dan [Ruby Mountain Inc., Salt Lake City, UT (United State); Jones, Phil L. [Ruby Mountain Inc., Salt Lake City, UT (United State); Burdge, Mark [Evergreen Clean Energy Management, Provo, UT (United States); Barker, Ben [Evergreen Clean Energy Management, Provo, UT (United States); Segall, Marylin [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Moore, Joseph [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Nash, Gregory [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Jones, Clay [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Simmons, Stuart [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Taylor, Nancy [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.

    2016-02-01

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

  17. The Impact of a Case of Ebola Virus Disease on Emergency Department Visits in Metropolitan Dallas-Fort Worth, TX, July, 2013-July, 2015: An Interrupted Time Series Analysis.

    Science.gov (United States)

    Molinari, Noelle-Angelique M; LeBlanc, Tanya Telfair; Stephens, William

    2018-03-20

    The first Ebola virus disease (EVD) case in the United States (US) was confirmed September 30, 2014 in a man 45 years old. This event created considerable media attention and there was fear of an EVD outbreak in the US. This study examined whether emergency department (ED) visits changed in metropolitan Dallas-Fort Worth--, Texas (DFW) after this EVD case was confirmed. Using Texas Health Services Region 2/3 syndromic surveillance data and focusing on DFW, interrupted time series analyses were conducted using segmented regression models with autoregressive errors for overall ED visits and rates of several chief complaints, including fever with gastrointestinal distress (FGI). Date of fatal case confirmation was the "event." Results indicated the event was highly significant for ED visits overall (Pcapacity as well as for public health messaging in the wake of a public health emergency.

  18. Fate of TCE in heated Fort Lewis soil.

    Science.gov (United States)

    Costanza, Jed; Fletcher, Kelly E; Löffler, Frank E; Pennell, Kurt D

    2009-02-01

    This study explores the transformation of trichloroethene (TCE) caused by heating contaminated soil and groundwater samples obtained from the East Gate Disposal Yard (EGDY) located in Fort Lewis, WA. After field samples transferring into glass ampules and introducing 1.5 micromol of TCE, the sealed ampules were incubated at temperatures of 25, 50, and 95 degrees C for periods of up to 95.5 days. Although TCE was completely transformed into cis-1,2-dichloroethene (cis-DCE) after 42 days at 25 degrees C by microbial activity, this transformation was not observed at 50 or 95 degrees C. Chloride levels increased after 42 days at 25 degrees C corresponding to the mass of TCE transformed to cis-DCE, were constant at 50 degrees C, and increased at 95 degrees C yielding a TCE degradation half-life of 1.6-1.9 years. These findings indicate that indigenous microbes contribute to the partial dechlorination of TCE to cis-DCE at temperatures of less than 50 degrees C, whereas interphase mass transfer and physical recovery of TCE will predominate over in situ degradation processes at temperatures of greater than 50 degrees C during thermal treatment at the EGDY site.

  19. Permafrost delineation for remediation planning : Fort Wainwright, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    Astley, B. [Cold Regions Research and Engineering Laboratory, Anchorage, AK (United States); Snyder, C. [YEC Inc., Valley Cottage, NJ (United States); Delaney, A. [Cold Regions Research and Engineering Laboratory, Fairbanks, AK (United States); Arcone, S.; Lawson, D. [Cold Regions Research and Engineering Laboratory, Hanover, NH (United States)

    2003-07-01

    In the summer of 1999, geophysical and hydrogeological surveys were conducted at the Birch Hill Tank Farm and Truck Fill Stand in Fort Wainwright, Alaska to assess the distribution of benzene, 1,2-dichloroethane, and 1,2-dibromoethane. The Birch Hill site consists of a silt, sand and gravel fluvial deposit that overlies bedrock. Permafrost occurs discontinuously throughout the alluvium and underlying bedrock, resulting in a complex aquifer distribution. The bedrock beneath the Tank Farm is highly fractured and faulted with a weathered horizon that is 30 meters thick. The goal of this study was to map the discontinuous permafrost and aquifers in the alluvial deposits and weathered bedrock zone for the purpose of delineating bedrock depth and structural features that influence ground water flow. Several methods were used to define subsurface conditions, including borehole logs, DC resistivity, and ground-penetrating radar. A 3-D hydrogeologic model was used to develop a ground water flow model used to determine contaminant migration pathways and rates. The permafrost configuration was found to be the most important boundary condition in this model. 7 refs., 1 tab., 5 figs.

  20. Federal land management, carbon sequestration, and climate change in the Southeastern U.S.: a case study with fort benning

    Science.gov (United States)

    Zhao, S.; Liu, S.; Li, Z.; Sohl, Terry L.

    2010-01-01

    Land use activities can have a major impact on the temporal trendsandspatialpatternsofregionalland-atmosphereexchange of carbon. Federal lands generally have substantially different land management strategies from surrounding areas, and the carbon consequences have rarely been quantified and assessed. Using the Fort Benning Installation as a case study, we used the General Ensemble biogeochemical Modeling System (GEMS) to simulate and compare ecosystem carbon sequestration between the U.S. Army's Fort Benning and surrounding areas from 1992 to 2050. Our results indicate that the military installation sequestered more carbon than surrounding areas from 1992 to 2007 (76.7 vs 18.5 g C m-2 yr-1), and is projected to continue sequestering more carbon from 2008 to 2050 (75.7 vs 25.6 g C m-2 yr-1), mostly because of the proactive management approaches adopted on military training lands. Our results suggest that federal lands might play a positive and important role in sequestering and conserving atmospheric carbon because some anthropogenic disturbances (e.g., urbanization, forest harvesting, and agriculture) can be minimized or prevented on federal lands

  1. Gravity survey and interpretation of Fort Irwin and vicinity, Mojave Desert, California: Chapter H in Geology and geophysics applied to groundwater hydrology at Fort Irwin, California

    Science.gov (United States)

    Jachens, Robert C.; Langenheim, V.E.; Buesch, David C.

    2014-01-01

    In support of a hydrogeologic study of the groundwater resources on Fort Irwin, we have combined new gravity data with preexisting measurements to produce an isostatic residual gravity map, which we then separated into two components reflecting (1) the density distribution in the pre-Cenozoic basement complex and (2) the distribution of low-density Cenozoic volcanic and sedimentary deposits that lie on top of the basement complex. The second component was inverted to estimate the three-dimensional distribution of Cenozoic deposits by using constraints from geology, drillholes, and time-domain electromagnetic soundings. In most of the base, the Cenozoic deposits are no more than 300 m thick, except in the basins with more than 500 m of fill beneath Coyote Lake, Red Pass Lake, west of Nelson Lake, west of Superior Lake, Bicycle Lake, and in the vicinity of Nelson Lake.

  2. Discrimination Using the Geonics EM63 in a Cued Interrogation Mode at Fort McClellan, AL

    Science.gov (United States)

    2009-03-01

    vectors of the nine items measured at the Ashland test plot: (a) Pasion - Oldenburg k1 versus k2; (b) Ratio of the primary polarization tensor at the 10th...discrimination potential of the Geonics EM63 at Fort McClellan, Alabama (AL) when deployed in a cued interrogation mode. Pasion - Oldenburg polarization...scrap metal, shrapnel and geology (e.g. Hart et al., 2001; Collins et al., 2001; Pasion & Oldenburg, 2001; Zhang et al., 2003a, 2003b; Billings

  3. Career Advancement and Work Support Services on the Job: Implementing the Fort Worth Work Advancement and Support Center Program

    Science.gov (United States)

    Schultz, Caroline; Seith, David

    2011-01-01

    The Work Advancement and Support Center (WASC) program in Fort Worth was part of a demonstration that is testing innovative strategies to help increase the income of low-wage workers, who make up a large segment of the U.S. workforce. The program offered services to help workers stabilize their employment, improve their skills, and increase their…

  4. Sinus lifting before Le Fort I maxillary osteotomy: a suitable method for oral rehabilitation of edentulous patients with skelettal class-III conditions: review of the literature and report of a case

    Directory of Open Access Journals (Sweden)

    Meyer Ulrich

    2007-01-01

    Full Text Available Abstract Background Functional rehabilitation of patients afflicted with severe mandibular and maxillary alveolar atrophy might be challenging especially in malformed patients. Methods Treatment planning using sinus lifting and implant placement before Le Fort I maxillary osteotomy in a patient with severe mandibular and posterior maxillary alveolar atrophy and skelettal class-III conditions due to cleft palate are described. Results A full functional and esthetic rehabilitation of the patient was achieved by a stepwise surgical approach performed through sinus lifting as the primary approach followed by implant placement and subsequent Le Fort I maxillary osteotomy to correct the maxillo-mandibular relation. Conclusion Stabilisation of the maxillary complex by a sinus lifting procedure in combination with computer aided implant placement as preorthodontic planning procedure before Le Fort I maxillary osteotomy seems to be suitable in order to allow ideal oral rehabilitation especially in malformed patients.

  5. Simultaneous measurements of helium and heavy nuclei fluxes in cosmic rays over Fort Churchill

    International Nuclear Information System (INIS)

    Bhatia, V.S.; Paruthi, S.; Kainth, G.S.

    1977-01-01

    We have made simultaneous measurements of fluxes of He an heavy nuclei (Z< or =10) in primary cosmic rays at three levels of solar activity. These nuclei have been studied in three nuclear emulsion stacks exposed over Fort Churchill, Canada, in 1963, 1964, and 1967. We had earlier reported our results on the heavy nuclei at the Hobart conference (Bhatia et al., 1971). Experimental results based on 1514 He nuclei tracks that were measured in these three stacks are presented in this paper. The experimentally obtained He and heavy nuclei differential energy spectra have been compared with the theoretically calculated near-earth spectra

  6. CHAP-2 heat-transfer analysis of the Fort St. Vrain reactor core

    International Nuclear Information System (INIS)

    Kotas, J.F.; Stroh, K.R.

    1983-01-01

    The Los Alamos National Laboratory is developing the Composite High-Temperature Gas-Cooled Reactor Analysis Program (CHAP) to provide advanced best-estimate predictions of postulated accidents in gas-cooled reactor plants. The CHAP-2 reactor-core model uses the finite-element method to initialize a two-dimensional temperature map of the Fort St. Vrain (FSV) core and its top and bottom reflectors. The code generates a finite-element mesh, initializes noding and boundary conditions, and solves the nonlinear Laplace heat equation using temperature-dependent thermal conductivities, variable coolant-channel-convection heat-transfer coefficients, and specified internal fuel and moderator heat-generation rates. This paper discusses this method and analyzes an FSV reactor-core accident that simulates a control-rod withdrawal at full power

  7. Preplaced aggregate concrete application on Fort St. Vrain PCRV construction

    International Nuclear Information System (INIS)

    Ople, F.S. Jr.

    1976-01-01

    Two distinct concreting methods were employed in the construction of the prestressed concrete reactor vessel (PCRV) of the Fort St. Vrain (FSV) Nuclear Generating Station, a 330 MW(e) High Temperature Gas-Cooled Reactor installation near Denver, Colorado. Preplaced aggregate concrete (PAC) techniques were employed in the PCRV bottom head and the core support floor; conventional job-mixed concrete was used in the PCRV sidewall and top head regions. This paper describes the successful application of PAC techniques utilized primarily in solving construction difficulties associated with confined and heavily congested regions of the PCRV. The PAC technique consists of placing coarse aggregate inside the forms, followed by injection of grout under pressure through embedded pipes to fill the interstices in the aggregate mass. Details of the PAC construction method including grout mix development, grouting equipment, grout pipe layout, grouting sequence, grout level monitoring, concrete temperature control, and pre-construction mockups are described. (author)

  8. An Archaeological Curation-Needs Assessment for Fort Irwin, Naval Air Station, North Island, Edwards Air Force Base, Marine Corps Air-Ground Combat Center, Twentynine Palms

    National Research Council Canada - National Science Library

    Trimble, Michael

    1997-01-01

    .... Louis District, conducted an investigation of all archaeological materials and associated records in the care of NAS North Island, Edwards Air Force Base, Fort Irwin, and MCAGCC Twentynine Palms...

  9. Atitudes linguísticas e r-forte em Carambeí = Linguistics attitudes and strong-R in Carambeí

    Directory of Open Access Journals (Sweden)

    Letícia Fraga

    2009-04-01

    Full Text Available Considerando que o município de Carambeí é bastante complexo cultural e linguisticamente, este estudo pretende, de acordo com o método etnográfico: a fazer um levantamento das atitudes linguísticas que os ‘holandeses’ manifestam em relação às línguas holandesa e portuguesa; b analisar a variedade de português falada pelos‘holandeses’ de Carambeí no que diz respeito ao uso do r-forte; e c estabelecer que tipo de relação se dá entre atitudes linguísticas e uso de determinada variante de r-forte no português. No que diz respeito às atitudes em relação ao holandês, os Grupos 1M, 1F e2Fa manifestam atitudes positivas, ao passo que os Grupos 2M e 2Fb têm atitudes negativas, assim como os Grupos 3M e 3F. Já em relação ao português, a comunidade como um todo manifesta atitudes positivas. No que diz respeito ao uso de r-forte, os grupos 1M e 1F usam vibrante múltipla e tepe; o Grupo 2M também usa a vibrante e otepe; já o Grupo 2Fa usa somente vibrante e tepe e o Grupo 2Fb usa fricativa e vibrante. Os Grupos 3M e 3F usam somente fricativa. Enfim, pode-se dizer que determinadas atitudes contribuem para o uso de determinada variedade de r-forte.Considering that Carambeí Township is fairly complex, both culturally and linguistically, this study intends to: a survey the linguistic attitudes that the ‘Dutch’ reveal concerning the Dutch and Portuguese languages; b analyze the variety of Portuguese spoken by the ‘Dutch’ of Carambeí regarding the use of strong-R; c establish what sort of relationship takes place between linguistic attitudes and use of certain varieties of the strong-R in Portuguese. About the attitudes regarding the Dutch language, Groups 1M, 1F and 2Fa show positive attitudes, while Groups 2M, 2Fb, 3M and 3F show negative attitudes.Portuguese, on the other hand, elicits positive attitudes in the community as a whole. Regarding the use of strong-R, groups 1M and 1F use trill and tap; group 2M also

  10. Mito e representação feminina em "O Forte" de Adonias Filho

    Directory of Open Access Journals (Sweden)

    Luciano Santos Neiva

    2012-05-01

    Full Text Available Com o objetivo de analisar os aspectos que tornam as representações de gênero como atualizadoras da redefinição da construção identitária, em contraponto ao legado fonofalologocêntrico eurodescendente, a partir da constituição do mito em O Forte de Adonias Filho; este artigo parte do princípio de que natureza fragmentada do ser humano contraria a pretensa homogeneização do ser, moldada pela abstrata universalidade moderna, cuja máxima é a racionalidade. Tal racionalidade ocidental, falocêntrica, branca, ignorou a heterogeneidade e não permitiu o surgimento de outras vozes, enquanto sujeitos do conhecimento. O presente artigo parte da hipótese de que o Forte é um elemento totêmico e desencadeia as relações míticas, que estabelecem tabus e possibilita – por ser o mito uma entidade pré-lógica ocidental – uma redefinição das representações femininas, em contraponto ao legado fonofalologocêntrico eurodescendente, ao longo das narrativas. O amor incondicional de Adonias Filho à condição humana nos permitiu, neste artigo, adentrar no recôndito de seres, marcados tanto pelo espaço, quanto pelo tempo, numa dimensão mítica. Se a memória do discurso ocidental revelou, em sua formação, pela via da padronização e da racionalização, princípios como a unidade, o fechamento, a ordem, o anseio do absoluto e a racionalidade, a memória mítica transpõe o pré-dado, possibilitando o olhar multifacetado.

  11. Licensing of HTGRs in the United States

    International Nuclear Information System (INIS)

    Fisher, C.R.; Orvis, D.D.

    1981-01-01

    The licensing history of the high-temperature gas-cooled reactor (HTGR) in the United States is given historical perspective. The experience began with the licensing of the Peach Bottom Atomic Power Station and extends to the continuing experience at the Fort St. Vrain Nuclear Generating Station. Additional experience was obtained from the licensing reviews in the mid-1970s of the large HTGR plants that were to be built by Philadelphia Electric Company and Delmarva Power and Light. Also, information was provided by the licensing review of the General Atomic standard plant by the U.S. Nuclear Regulatory Commission (NRC) at about the same time. These experiences are summarized in terms of the principal design criteria that were required by the regulatory authority for each project. These criteria include specification of the design basis accidents that were postulated for the plant safety analysis. Several technical issues raised by the NRC during their review of the large HTGR are presented. (author)

  12. Licensing of HTGRs in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, C. R.; Orvis, D. D. [General Atomic Co., San Diego, CA (USA)

    1981-01-15

    The licensing history of the high-temperature gas-cooled reactor (HTGR) in the United States is given historical perspective. The experience began with the licensing of the Peach Bottom Atomic Power Station and extends to the continuing experience at the Fort St. Vrain Nuclear Generating Station. Additional experience was obtained from the licensing reviews in the mid-1970s of the large HTGR plants that were to be built by Philadelphia Electric Company and Delmarva Power and Light. Also, information was provided by the licensing review of the General Atomic standard plant by the U.S. Nuclear Regulatory Commission (NRC) at about the same time. These experiences are summarized in terms of the principal design criteria that were required by the regulatory authority for each project. These criteria include specification of the design basis accidents that were postulated for the plant safety analysis. Several technical issues raised by the NRC during their review of the large HTGR are presented.

  13. Two Expeditions to Capture Fort Duquesne: A Study in Understanding the Operational Environment and Attendant Failure (1755) and Success (1758)

    Science.gov (United States)

    2013-03-27

    Empire in the Ohio Valley………………………………………………….…5 The Objective: Fort Duquesne…………………………………………………………....7 The Physical Enviroment

  14. Soil classification using CPTu in Fort McMurray

    Energy Technology Data Exchange (ETDEWEB)

    Elbanna, M. [AMEC Earth and Environmental, Nanaimo, BC (Canada); El Sabbagh, M. [AMEC Earth and Environmental, Burnaby, BC (Canada); Sharp, J. [ConeTec Investigations Ltd., Richmond, BC (Canada)

    2009-07-01

    This paper evaluated 4 piezocone penetration testing (CPTu) classification methods using data from 3 different sites near Fort McMurray in northern Alberta. For comparative purposes, other in-situ tests, field observations, and laboratory tests were performed at all sites in close proximity to the CPTu soundings. The study evaluated pleistocene sand and sand till deposits with low fines content. Profiling these deposits is necessary because they are often used as filler material for earth retaining structures in many oilsands projects. The study also evaluated pleistocene clay and clay tills that are often used as low permeability material for seepage control. In thick layers, pleistocene clay is known to cause foundation problems. CPTu with dissipation data was shown to be a useful tool in geotechnical engineering practice to provide near continuous soil profiling and material properties. CPTu tip resistance and sleeve friction combined with pore pressure measurement provided useful evaluation of subsurface soil types. It was concluded that although all of the CPTu classification charts provided reasonable soil classification in typical soil conditions, local experience and understanding of soil behaviour is needed to make an appropriate selection of the most applicable charts in a given geological condition. 7 refs., 11 figs.

  15. LeFort I osteotomy and secondary procedures in full-face transplant patients.

    Science.gov (United States)

    Barret, Juan P; Serracanta, Jordi

    2013-05-01

    Composite tissue allotransplantion has been the latest addition to reconstructive plastic surgery of limbs and faces. These techniques have opened up a new paradigm in reconstruction. However, plastic surgeons will have to face a new patient population that receives the application of vascularised tissue allografts and immunosuppression. Secondary surgery may be necessary in this population, especially in the transplanted tissues, to improve aesthetics and function following the transplant, although little is known regarding the exact clinical protocol to be followed and the feasibility of standard plastic surgery techniques on transplanted tissues. We present our experience of a LeFort I osteotomy, limited ritidectomy and blepharoplasty in a full-face transplant recipient. Copyright © 2012 British Association of Plastic, Reconstructive and Aesthetic Surgeons. Published by Elsevier Ltd. All rights reserved.

  16. Learning from Our Military History: The United States Army, Operation Iraqi Freedom, and the Potential for Operational Art and Thinking

    Science.gov (United States)

    2013-06-14

    relationships, etc. 63For a philosophical and academic argument against EBO/EBAO, see Tim Challans, “Tipping Sacred Cows: Moral Potential Through...Springer, Fort Bliss , TX, 3 March 2011; BC020, Interview; BG060, Battalion Commander, Interview by Mark Battjes, Fort Stewart, GA, 15 March 2011. A...Interview; BE060, Interview; BC020, Interview; BB020, Battalion Commander, Interview by Mark Battjes and Nathan Springer, Fort Bliss , TX, 2 March

  17. Production and study of high intensity discharges; Production et etude de decharges a forte intensite

    Energy Technology Data Exchange (ETDEWEB)

    Breton, C; Charbon, J; Hubert, P; Vendryes, G; Yvon, P [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1957-07-01

    High intensity discharges have been induced in a pyrex toroid filled with argon or deuterium at low pressure. An attempt was made to stabilise the ring of plasma by the joint action of a metal screen and a longitudinal magnetic field. Penetrating X-ray have been observed under certain conditions. (author) [French] Des decharges a forte intensite ont ete induites dans une tore en pyrex rempli d'argon ou de deuterium sous basse pression. On a cherche a stabiliser l'anneau de plasma par l'action conjuguee d'un champ magnetique longitudinal. Un rayon X penetrant a ete observe dans certaines conditions. (auteur)

  18. Custom-made prefabricated titanium miniplates in Le Fort I osteotomies: principles, procedure and clinical insights.

    Science.gov (United States)

    Philippe, B

    2013-08-01

    This paper describes a new type of miniplate system that is designed and custom made during virtual surgery planning based on an individual patient's osteotomy. These miniplates are prefabricated with commercially pure porous titanium using direct metal laser sintering. The principles that guide the conception and production of this new miniplate are presented. The surgical procedure from the stage of virtual surgery planning until the final Le Fort I osteotomy and bone fixation are described using a case example. Copyright © 2013 International Association of Oral and Maxillofacial Surgeons. Published by Elsevier Ltd. All rights reserved.

  19. Stability of the anterior maxillary segment and teeth after segmental le fort I osteotomy and postoperative skeletal elastic fixation with or without occlusal splint

    DEFF Research Database (Denmark)

    Blæhr, Tue Lindberg; Jensen, Thomas; Due, Karen Margrethe

    2014-01-01

    OBJECTIVES: To assess the short term dental and skeletal stability of the anterior maxillary segment after segmental Le Fort I osteotomy with postoperative skeletal elastic fixation with or without occlusal splint. MATERIAL AND METHODS: 29 consecutive patients underwent segmental Le Fort I...... osteotomy and elastic skeletal fixation was applied. Patients were divided into two groups according to whether a fixed occlusal splint was used for six weeks (group A) or dismounted perioperatively (group B). Changes in landmarks and reference planes between the two timepoints were estimated on lateral.......83 to 1.69°). There was no statistically significant difference in stability between the two groups at the P value 0.05. CONCLUSIONS: The skeletal anterior fixation with postoperative elastics for eight weeks may not compromise the early postoperative dental and skeletal stability of the anterior segment...

  20. Guide to General Atomic studies of hypothetical nuclear driven accidents for the Fort St. Vrain reactor

    International Nuclear Information System (INIS)

    Wei, T.; Tobias, M.

    1974-03-01

    The work of the General Atomic Company (GAC) in preparing those portions of the Final Safety Analysis Report for the Fort St. Vrain Reactor (FSV) having to do with hypothetical nuclear driven accidents has been reviewed and a guide to this literature has been prepared. The sources for this study are the Final Safety Analysis Report itself, the Quarterly and Monthly Progress Reports, Topical Reports, and Technical Specifications. The problems considered and the methods used are outlined. An appendix gives a systematic analysis which was used as a guide in organizing the references. (U.S.)

  1. The Role of Occupant Behavior in Achieving Net Zero Energy: A Demonstration Project at Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Judd, Kathleen S.; Sanquist, Thomas F.; Zalesny, Mary D.; Fernandez, Nicholas

    2013-09-30

    This study, sponsored by the U.S. General Services Administration’s Office of Federal High-Performance Green Buildings, aimed to understand the potential for institutional and behavioral change to enhance the performance of buildings, through a demonstration project with the Department of Defense in five green buildings on the Fort Carson, Colorado, Army base. To approach this study, the research team identified specific occupant behaviors that had the potential to save energy in each building, defined strategies that might effectively support behavior change, and implemented a coordinated set of actions during a three-month intervention.

  2. The Origin of Basalt and Cause of Melting Beneath East Antarctica as Revealed by the Southernmost Volcanoes on Earth

    Science.gov (United States)

    Reindel, J. L.; Panter, K. S.; Smellie, J. L.; McIntosh, W. C.

    2017-12-01

    Mt. Early and Sheridan Bluff are two basaltic monogenetic volcanoes located at 87° South latitude at the head of the Scott Glacier. These Early Miocene volcanoes lie 800 km from any other volcano and 200 km inland from the shoulder of the West Antarctic Rift System (WARS), which is the foci of most Cenozoic alkaline volcanism in Antarctica. Preliminary 40Ar/39Ar dates suggest that Mt. Early is older than previously determined and closer in age to Sheridan Bluff ( 19 Ma). Petrography, mineral chemistry and whole rock major and trace element concentrations are used to characterize the basalts and to determine whether they are genetically related to mafic volcanism in the WARS. The basalts are porphyritic with phenocrysts of olivine (Fo 58-84%), plagioclase (An 48-67%) ± clinopyroxene (Wo 43-48%). Whole rock MgO range from 10 to 4 wt.% and have restricted SiO2 (48 to 50 wt.%) contents. The basalts vary from alkaline (up to 6 wt.% Ne-normative) to subalkaline (up to 6 wt.% Hy-normative). The alkaline basalts that occur at both Mt. Early and Sheridan Bluff are more strongly enriched in incompatible elements (La 33-49 ppm, Ba 270-484 ppm, Sr 712-1009 ppm), have LaN/YbN ratios >10 and show prominent Pb negative anomalies with only slight K negative anomalies on primitive mantle normalized, multi-element diagrams. Subalkaline basalts (only at Sheridan Bluff) have lower concentrations of incompatible elements (La 14-16 ppm, Ba 110-144 ppm, and Sr 358-380 ppm), LaN/YbN ratios base of the East Antarctic craton and its replacement by warmer asthenosphere has been proposed for this region based on geophysical evidence (Heeszel et al., 2016). The volcanism may constrain the timing of this event. Heeszel et al. (2016) JGR, 121, 1758-1775.

  3. Analysis of Aquifer Response, Groundwater Flow, and PlumeEvolution at Site OU 1, Former Fort Ord, California

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, Preston D.; Oldenburg, Curtis M.; Su, Grace W.

    2005-02-24

    This report presents a continuation from Oldenburg et al. (2002) of analysis of the hydrogeology, In-Situ Permeable Flow Sensor (ISPFS) results, aquifer response, and changes in the trichloroethylene (TCE) groundwater plume at Operational Unit 1 (OU 1) adjacent to the former Fritzsche Army Airfield at the former Fort Ord Army Base, located on Monterey Bay in northern Monterey County. Fuels and solvents were burned on a portion of OU 1 called the Fire Drill Area (FDA) during airport fire suppression training between 1962 and 1985. This activity resulted in soil and groundwater contamination in the unconfined A-aquifer. In the late 1980's, soil excavation and bioremediation were successful in remediating soil contamination at the site. Shortly thereafter, a groundwater pump, treat, and recharge system commenced operation. This system has been largely successful at remediating groundwater contamination at the head of the groundwater plume. However, a trichloroethylene (TCE) groundwater plume extends approximately 3000 ft (900 m) to the northwest away from the FDA. In the analyses presented here, we augment our prior work (Oldenburg et al., 2002) with new information including treatment-system totalizer data, recent water-level and chemistry data, and data collected from new wells to discern trends in contaminant migration and groundwater flow that may be useful for ongoing remediation efforts. Some conclusions from the prior study have been modified based on these new analyses, and these are pointed out clearly in this report.

  4. “Quiero ser una máquina de escribir”: el Alfabeto Dactilar (2014 del artista, activista y poeta Cristian Forte como nuevo orden poético en el caos

    Directory of Open Access Journals (Sweden)

    Sandra Hettmann

    2016-10-01

    Full Text Available En un primer paso, el artículo presentará al poeta Cristian Forte para situar su trabajo artístico y, a la vez, esbozar la formación del Alfabeto Dactilar. En un segundo paso, se aclarará la afirmación de que el Alfabeto Dactilar constituye más bien un sistema para captar el flujo de apariencias de una obra literaria en sí. En este contexto, se esbozará una breve discusión sobre la dactiloscopia, las técnicas de control y poder. Por último, se discutirán dos poemas dactilares de Cristian Forte que se acaban de publicar. En el marco de las siguientes preguntas: ¿cómo aplicar lecturas y escrituras dactilares con el alfabeto?, y ¿en qué medida se establecen nuevos vínculos entre cuerpos, cosas y palabras?, se sitúa la hipótesis de que la dactiloscopia poética de Forte genera una novedosa literatura corporal y, al mismo tiempo, una visibilidad plástica que ponen en marcha una caligrafía del cuerpo íntegramente performativa y semánticamente transgresora.

  5. Career Advancement and Work Support Services on the Job: Implementing the Fort Worth Work Advancement and Support Center Program. Executive Summary

    Science.gov (United States)

    Schultz, Caroline; Seith, David

    2011-01-01

    The Work Advancement and Support Center (WASC) program in Fort Worth was part of a demonstration that is testing innovative strategies to help increase the income of low-wage workers, who make up a large segment of the U.S. workforce. The program offered services to help workers stabilize their employment, improve their skills, and increase their…

  6. Investigations of postulated accident sequences for the Fort St. Vrain HTGR

    International Nuclear Information System (INIS)

    Ball, S.J.; Cleveland, J.C.; Conklin, J.C.; Hatta, M.; Sanders, J.P.

    1978-01-01

    The systems analysis capability of the ORNL HTGR Safety analysis research program includes a family of computer codes: an overall plant NSSS simulation (ORTAP), and detailed component codes for investigating core neutronic accidents (CORTAP), shutdown emergency-cooling accidents via a 3-dimensional core model (ORECA), and once-through steam generator transients (BLAST). The component codes can either be run independently or in the overall NSSS code. Verification efforts have consisted primarily of using existing Fort St. Vrain reactor dynamics data to compare against code predictions. Comparisons of core thermal conditions made for reactor scrams from power levels between 30 and 50% showed good agreement. An optimization program was used to rationalize the difference between the predicted and measured refueling region outlet temperatures, and, in general, excellent agreement was attained by adjustment of models and parameters within their uncertainty ranges. However, more work is required to establish a unique and valid set of models

  7. 76 FR 45644 - Montana Disaster Number MT-00063

    Science.gov (United States)

    2011-07-29

    ..., Liberty, Madison, Park, Pondera, Powell, Ravalli, Richland, Sheridan, Teton, Toole, and the Blackfeet... Federal Domestic Assistance Numbers 59002 and 59008) James E. Rivera, Associate Administrator for Disaster...

  8. Preliminary assessment report for Fort William Henry Harrison, Montana Army National Guard, Helena, Montana

    International Nuclear Information System (INIS)

    DuWaldt, J.; Meyer, T.

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at a Montana Army National Guard (MTARNG) property near Helena, Montana. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort William Henry Harrison property, requirements of the Department of Defense Installation Restoration Program

  9. CONARC Training Workshop, Fort Gordon, Georgia, 5-7 October 1971. Volume I. General: Opening, Closing, and Dinner Sessions.

    Science.gov (United States)

    1971-10-01

    Jack and Bobby Kennedy, Jim Plunkett, George Jackson, the Beatles , Janice Joplin, and the growing number of men who have walked on the moon. It...Executive Summary as an Interim Re- port on the CONARC Training Workshop, which was held 5-7 October 1971 at Fort Gordon, Georgia. 3. The report will be...volume will be sent to each addressee to form two complete sets of the report. Requests for additional copies of the separate volumes will be filled

  10. ATU/Fort Hood Solar Total Energy Military Large-Scale Experiment (LSE-1): system design and support activities. Final report, November 23, 1976-November 30, 1977

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    The ATU/Fort Hood Solar Total Energy System will include a concentrating solar collector field of several acres. During periods of direct insolation, a heat-transfer fluid will be circulated through the collector field and thus heated to 500 to 600/sup 0/F. Some of the fluid will be circulated through a steam generator to drive a turbine-generator set; additional fluid will be stored in insulated tanks for use when solar energy is not available. The electrical output will satisfy a portion of the electrical load at Fort Hood's 87,000 Troop Housing Complex. Heat extracted from the turbine exhaust in the form of hot water will be used for space heating, absorption air conditioning, and domestic water heating at the 87,000 Complex. Storage tanks for the hot water are also included. The systems analysis and program support activities include studies of solar availability and energy requirements at Fort Hood, investigation of interfacing LSE-1 with existing energy systems at the 87,000 Complex, and preliminary studies of environmental, health, and safety considerations. An extensive survey of available concentrating solar collectors and modifications to a computerized system simulation model for LSE-1 use are also reported. Important program support activities are military liaison and information dissemination. The engineering test program reported involved completion of the Solar Engineering Test Module (SETM) and extensive performance testing of a single module of the linear-focusing collector.

  11. Production and study of high intensity discharges; Production et etude de decharges a forte intensite

    Energy Technology Data Exchange (ETDEWEB)

    Breton, C.; Charbon, J.; Hubert, P.; Vendryes, G.; Yvon, P. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1957-07-01

    High intensity discharges have been induced in a pyrex toroid filled with argon or deuterium at low pressure. An attempt was made to stabilise the ring of plasma by the joint action of a metal screen and a longitudinal magnetic field. Penetrating X-ray have been observed under certain conditions. (author) [French] Des decharges a forte intensite ont ete induites dans une tore en pyrex rempli d'argon ou de deuterium sous basse pression. On a cherche a stabiliser l'anneau de plasma par l'action conjuguee d'un champ magnetique longitudinal. Un rayon X penetrant a ete observe dans certaines conditions. (auteur)

  12. Soft Tissue Changes in Cleft Lip and Palate Patients: Anterior Maxillary Distraction versus Conventional Le-Fort I Osteotomy.

    Science.gov (United States)

    Markose, Eldho; Paulose, Joby; Paul, Eldho T

    2013-12-01

    The purpose of the study was to compare the soft tissue changes after maxillary advancement in patients with maxillary deficiency associated with cleft lip and palate (CLP) by two approaches-anterior maxillary distraction (AMD) and advancement LeFort I osteotomy (ALO). Twenty patients with maxillary hypoplasia associated with cleft lip and palate who had undergone either LeFort I osteotomy or distraction osteogenesis with maxillary advancement were included in this study. Lateral cephalogram taken at various intervals of time were used to evaluate soft tissue and hard tissue changes over time. In both groups, vertical as well as horizontal changes in pronasale was well observed. A substantial increase in nasal parameters was noted in case of AMD group in comparison to ALO. Though maxillary advancement was evident in both the groups, a significant and consistent change was observed in AMD. Significant vertical and horizontal changes were seen with respect to subnasale and labrale superius in AMD group. Soft tissue as well as hard tissue relapse was greater in ALO group than AMD group. Significant soft tissue and hard tissue changes were clearly observed in both the groups, but the treatment results were more consistent in cases treated with AMD. Hence AMD could be considered as a better treatment of choice in cases of maxillary hypoplasia associated with cleft lip and palate.

  13. The study of the effectiveness and safety of vitamin-mineral complex «Focus Forte» for myopia treatment

    Directory of Open Access Journals (Sweden)

    E. Yu. Egorova

    2012-01-01

    Full Text Available Purpose: the estimation of the results of a randomized study of the effectiveness of vitamin-mineral complex «Focus Forte» at myopia.Methods: this study included 60 young patients (in age from 16 to18 years, university students, full-time education in the context of complex treatment within 2 months. Patients were randomized to receive the preparation (n=30 or into the control group (standard therapy, n=30. On the day «0» and the day «60» over 80 parameters of vision were measured using a special software package.Results: the comparisons of the studied parameters of vision on the day of «60» shown statistically significant differences in electrosen- sibility (O. R. 4.6, 95% C. I. 1.4-16, p=0,03, spatial contrast sensitivity (O. R. 9.0, 95% C. I. 1.5-17, p<0,006 and luminance sensitivity (O. R. 5.6, 95% DI 1.7-19; p=0,003 as well as a significant reduction of clinical symptoms of zinc deficiency and hypovitaminosеs A, C, E, B2 (p<0,001.Conclusion: «Focus Forte» helps to improve visual function among the students with myopia, helping to compensate for deficiency of vitamins and micronutrients, which is required for the physiological support of the molecular processes of vision.

  14. The study of the effectiveness and safety of vitamin-mineral complex «Focus Forte» for myopia treatment

    Directory of Open Access Journals (Sweden)

    E. Yu. Egorova

    2014-07-01

    Full Text Available Purpose: the estimation of the results of a randomized study of the effectiveness of vitamin-mineral complex «Focus Forte» at myopia.Methods: this study included 60 young patients (in age from 16 to18 years, university students, full-time education in the context of complex treatment within 2 months. Patients were randomized to receive the preparation (n=30 or into the control group (standard therapy, n=30. On the day «0» and the day «60» over 80 parameters of vision were measured using a special software package.Results: the comparisons of the studied parameters of vision on the day of «60» shown statistically significant differences in electrosen- sibility (O. R. 4.6, 95% C. I. 1.4-16, p=0,03, spatial contrast sensitivity (O. R. 9.0, 95% C. I. 1.5-17, p<0,006 and luminance sensitivity (O. R. 5.6, 95% DI 1.7-19; p=0,003 as well as a significant reduction of clinical symptoms of zinc deficiency and hypovitaminosеs A, C, E, B2 (p<0,001.Conclusion: «Focus Forte» helps to improve visual function among the students with myopia, helping to compensate for deficiency of vitamins and micronutrients, which is required for the physiological support of the molecular processes of vision.

  15. Management and Data Management Plan for Remedial Investigation at Fort George G. Meade Landfill and Preliminary Assessment/Site Investigation at the Former Gaithersburg NIKE Control and Launch Areas

    National Research Council Canada - National Science Library

    Edwards, D

    1989-01-01

    Work assignments under this contract will include a Preliminary Assessment/Site Investigation at the former Gaithersburg NIKE Control and Launch Areas and a Remedial Investigation at the Fort Meade...

  16. Process Optimization Assessment: Fort Leonard Wood, MO and Fort Carson, CO

    Science.gov (United States)

    2003-11-01

    do not justify the capability of high efficiency load following and all of the "bells and whistles ." "* The result is that one unit randomly will...variety of tools using airborne ultrasound technology allow inspectors to detect deteriorating components and repair them before they fail. The results...plant might limit pe- riodic inspections to one or two departments. As maintenance crews become more familiar with ultrasound and inspection techniques

  17. Final Environmental Statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1989-10-01

    In September 1981, the staff of the Nuclear Regulatory Commission (NRC) issued its Final Environmental Statement (NUREG-0775) related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446), located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. The NRC has prepared this supplement to NUREG-0775 to present its evaluation of the alternative of operating Comanche Peak with the installation of further severe-accident-mitigation design features. The NRC has discovered no substantial changes in the proposed action as previously evaluated in the Final Environmental Statement that are relevant to environmental concerns and bearing on the licensing of Comanche Peak Steam Electric Station, Units 1 and 2. 6 refs., 3 tabs

  18. Modeling Soil Quality Thresholds to Ecosystem Recovery at Fort Benning, Georgia, USA

    Energy Technology Data Exchange (ETDEWEB)

    Garten Jr., C.T.

    2004-03-08

    The objective of this research was to use a simple model of soil C and N dynamics to predict nutrient thresholds to ecosystem recovery on degraded soils at Fort Benning, Georgia, in the southeastern USA. The model calculates aboveground and belowground biomass, soil C inputs and dynamics, soil N stocks and availability, and plant N requirements. A threshold is crossed when predicted soil N supplies fall short of predicted N required to sustain biomass accrual at a specified recovery rate. Four factors were important to development of thresholds to recovery: (1) initial amounts of aboveground biomass, (2) initial soil C stocks (i.e., soil quality), (3) relative recovery rates of biomass, and (4) soil sand content. Thresholds to ecosystem recovery predicted by the model should not be interpreted independent of a specified recovery rate. Initial soil C stocks influenced the predicted patterns of recovery by both old field and forest ecosystems. Forests and old fields on soils with varying sand content had different predicted thresholds to recovery. Soil C stocks at barren sites on Fort Benning generally lie below predicted thresholds to 100% recovery of desired future ecosystem conditions defined on the basis of aboveground biomass (18000 versus 360 g m{sup -2} for forests and old fields, respectively). Calculations with the model indicated that reestablishment of vegetation on barren sites to a level below the desired future condition is possible at recovery rates used in the model, but the time to 100% recovery of desired future conditions, without crossing a nutrient threshold, is prolonged by a reduced rate of forest growth. Predicted thresholds to ecosystem recovery were less on soils with more than 70% sand content. The lower thresholds for old field and forest recovery on more sandy soils are apparently due to higher relative rates of net soil N mineralization in more sandy soils. Calculations with the model indicate that a combination of desired future

  19. Assessment of groundwater, soil-gas, and soil contamination at the Vietnam Armor Training Facility, Fort Gordon, Georgia, 2009-2011

    Science.gov (United States)

    Guimaraes, Wladmir B.; Falls, W. Fred; Caldwell, Andral W.; Ratliff, W. Hagan; Wellborn, John B.; Landmeyer, James E.

    2012-01-01

    The U.S. Geological Survey, in cooperation with the U.S. Department of the Army Environmental and Natural Resources Management Office of the U.S. Army Signal Center and Fort Gordon, Georgia, assessed the groundwater, soil gas, and soil for contaminants at the Vietnam Armor Training Facility (VATF) at Fort Gordon, from October 2009 to September 2011. The assessment included the detection of organic compounds in the groundwater and soil gas, and inorganic compounds in the soil. In addition, organic contaminant assessment included organic compounds classified as explosives and chemical agents in selected areas. The assessment was conducted to provide environmental contamination data to the U.S. Army at Fort Gordon pursuant to requirements of the Resource Conservation and Recovery Act Part B Hazardous Waste Permit process. This report is a revision of "Assessment of soil-gas, surface-water, and soil contamination at the Vietnam Armor Training Facility, Fort Gordon, Georgia, 2009-2010," Open-File Report 2011-1200, and supersedes that report to include results of additional samples collected in July 2011. Four passive samplers were deployed in groundwater wells at the VATF in Fort Gordon. Total petroleum hydrocarbons and benzene and octane were detected above the method detection level at all four wells. The only other volatile organic compounds detected above their method detection level were undecane and pentadecane, which were detected in two of the four wells. Soil-gas samplers were deployed at 72 locations in a grid pattern across the VATF on June 3, 2010, and then later retrieved on June 9, 2010. Total petroleum hydrocarbons were detected in 71 of the 72 samplers (one sampler was destroyed in the field and not analyzed) at levels above the method detection level, and the combined mass of benzene, toluene, ethylbenzene, and total xylene (BTEX) was detected above the detection level in 31 of the 71 samplers that were analyzed. Other volatile organic compounds

  20. O Processo de Construção de uma Marca Forte que se Popularizou. O Caso Consul.

    OpenAIRE

    Onésimo Oliveira Cardoso; Evange Elias Assis; Francisco Antonio Serralvo

    2012-01-01

    Este artigo tem como objetivo analisar o processo de construção de uma marca forte que se popularizou ao aproveitar uma oportunidade de negócio para expandir seu mercado, abordando o caso da marca Consul, pertencente ao Grupo Whirlpool. A metodologia consiste em um estudo de caso, no qual se checa um referencial teórico pré-existente com as informações obtidas em entrevistas qualitativas e levantamento bibliográfico. Constatou-se que a Consul se fortaleceu no mercado com produtos de qualidad...

  1. U.S.-China Military Contacts: Issues for Congress

    Science.gov (United States)

    2013-07-25

    Washington, and New York. Despite the unofficial talks, PACOM Commander (Admiral Tim Keating), Chairman of the Joint Chiefs of Staff (Admiral Mike...led a delegation on military environmental protection matters to the United States. They visited Washington, DC; Fort Pickett in Virginia; Fort Bliss

  2. Assessment of groundwater, soil-gas, and soil contamination at the Vietnam Armor Training Facility, Fort Gordon, Georgia, 2009-2010

    Science.gov (United States)

    Guimaraes, Wladmir B.; Falls, W. Fred; Caldwell, Andral W.; Ratliff, W. Hagan; Wellborn, John B.; Landmeyer, James E.

    2011-01-01

    The U.S. Geological Survey, in cooperation with the U.S. Department of the Army Environmental and Natural Resources Management Office of the U.S. Army Signal Center and Fort Gordon, Georgia, assessed the groundwater, soil gas, and soil for contaminants at the Vietnam Armor Training Facility (VATF) at Fort Gordon, from October 2009 to September 2010. The assessment included the detection of organic compounds in the groundwater and soil gas, and inorganic compounds in the soil. In addition, organic contaminant assessment included organic compounds classified as explosives and chemical agents in selected areas. The assessment was conducted to provide environmental contamination data to the U.S. Army at Fort Gordon pursuant to requirements of the Resource Conservation and Recovery Act Part B Hazardous Waste Permit process. Four passive samplers were deployed in groundwater wells at the VATF in Fort Gordon. Total petroleum hydrocarbons were detected above the method detection level at all four wells. The only other volatile organic compounds detected above their method detection level were undecane and pentadecane, which were detected in two of the four wells sampled. Soil-gas samplers were deployed at 72 locations in a grid pattern across the VATF. Total petroleum hydrocarbons were detected in 71 of the 72 samplers (one sampler was destroyed in the field and not analyzed) at levels above the method detection level, and the combined mass of benzene, toluene, ethylbenzene, and total xylene was detected above the detection level in 31 of the 71 samplers that were analyzed. Other volatile organic compounds detected above their respective method detection levels were naphthalene, 2-methyl-naphthalene, tridecane, 1,2,4-trimethylbenzene, and perchloroethene. Subsequent to the soil-gas survey, four areas determined to have elevated contaminant mass were selected and sampled for explosives and chemical agents. No detections of explosives or chemical agents above their

  3. Impacts of Mackenzie gas project on water supply systems of northern communities : Fort Simpson as a case study

    International Nuclear Information System (INIS)

    Mathrani, M.; Johnson, K.

    2007-01-01

    The proposed Mackenzie Gas Project (MGP) is a 1220-kilometre natural gas pipeline system along the Mackenzie Valley of Canada's Northwest Territories. The line will connect northern onshore gas fields with North American markets. Four major Canadian oil and gas companies and a group representing the Aboriginal peoples of Canada's Northwest Territories are partners in the proposed MGP. The MGP is currently in the project definition stage that involves examining the effect of the project on northern communities. Fort Simpson is located on an island, on the forks of the Mackenzie and Liard Rivers and is proposed as the major route for the MGP with the construction of barge handling areas, storage areas, camps/housing units and use of air and highway facilities. These activities are expected to result in burden on local civil infrastructure systems including water supply systems. Although the environmental impacts of the project on the community's infrastructure systems are projected by the MGP proponents, the local authority wanted to conduct its own assessment of the impacts on local water supply system. This paper presented the results of a study that examined the amount of water used by the community based upon available water use records and the current operational and maintenance costs based upon available financial documents. The study also estimated future water requirements based upon MGP activities and associated population growth. Current and future economic rates were also determined. 13 refs., 6 tabs

  4. Newest oil sands mine on the horizon : Fort McMurray's next megaproject

    Energy Technology Data Exchange (ETDEWEB)

    Werniuk, J.

    2005-08-01

    The newly approved Horizon mine project and on-site upgrader project will be one of Canada's largest oil sands operation. The site for the facility is 70 km north of Fort McMurray, Alberta. Drilling has revealed an in-place resource of 16 billion bbl of bitumen, of which 6 billion bbl is potentially recoverable using existing mining technologies. In situ recovery potential on the western parts of the lease will be used to obtain additional resources. Horizon is owned by Calgary-based Canadian Natural Resource Limited, the second largest oil and gas company in Canada. This senior oil and gas company has operations in western Canada, the United Kingdom, the North Sea and offshore West Africa. The 3-phase Horizon project will have a capital of $10.8 billion, including contingencies. The mine will be a truck and shovel operation, mining 450,000 tonnes of oil sand daily from 2 main pits. The clean, diluted bitumen from the froth treatment plant will be sent to an onsite upgrader that will use delayed coking technology to recover 99 per cent of the sulphur using a tail gas cleanup unit. All of the product will be hydrotreated. In the first phase, the mine will produce sweet synthetic crude oil by the second half of 2008 at a daily rate of 110,000 bbl. This will increase in the second phase to 155,000 bbl per day SCO by 2010 and to 232,000 bbl per day SCO by 2012. The tailings during the first phase will be sent to a conventional tailings pond. A non-segregating tailings disposal method will be considered for the second phase to reduce the size of the required tailings pond and to leave less of an environmental footprint. A 1.83 million cubic metre raw water pond is being built into the project to recycle as much of the water as possible. The Horizon leases include traditional lands of several First Nation bands. Canadian Natural is involving Aboriginal communities in the project through employment and consultation for traditional environmental knowledge. During peak

  5. Paleofaunal and Environmental Research on Miocene Fossil Sites TVOR SE and TVOR S on Fort Polk, Louisiana, with Continued Survey, Collection, Processing, and Documentation of other Miocene Localities

    National Research Council Canada - National Science Library

    Schiebout, Judith

    2004-01-01

    Focus of paleontological research on the Miocene of Fort Polk is currently the marine locality TVOR SE, which also has yielded large and small terrestrial Miocene vertebrates, and a single Cretaceous...

  6. Establishing cephalometric landmarks for the translational study of Le Fort-based facial transplantation in Swine: enhanced applications using computer-assisted surgery and custom cutting guides.

    Science.gov (United States)

    Santiago, Gabriel F; Susarla, Srinivas M; Al Rakan, Mohammed; Coon, Devin; Rada, Erin M; Sarhane, Karim A; Shores, Jamie T; Bonawitz, Steven C; Cooney, Damon; Sacks, Justin; Murphy, Ryan J; Fishman, Elliot K; Brandacher, Gerald; Lee, W P Andrew; Liacouras, Peter; Grant, Gerald; Armand, Mehran; Gordon, Chad R

    2014-05-01

    Le Fort-based, maxillofacial allotransplantation is a reconstructive alternative gaining clinical acceptance. However, the vast majority of single-jaw transplant recipients demonstrate less-than-ideal skeletal and dental relationships, with suboptimal aesthetic harmony. The purpose of this study was to investigate reproducible cephalometric landmarks in a large-animal model, where refinement of computer-assisted planning, intraoperative navigational guidance, translational bone osteotomies, and comparative surgical techniques could be performed. Cephalometric landmarks that could be translated into the human craniomaxillofacial skeleton, and that would remain reliable following maxillofacial osteotomies with midfacial alloflap inset, were sought on six miniature swine. Le Fort I- and Le Fort III-based alloflaps were harvested in swine with osteotomies, and all alloflaps were either autoreplanted or transplanted. Cephalometric analyses were performed on lateral cephalograms preoperatively and postoperatively. Critical cephalometric data sets were identified with the assistance of surgical planning and virtual prediction software and evaluated for reliability and translational predictability. Several pertinent landmarks and human analogues were identified, including pronasale, zygion, parietale, gonion, gnathion, lower incisor base, and alveolare. Parietale-pronasale-alveolare and parietale-pronasale-lower incisor base were found to be reliable correlates of sellion-nasion-A point angle and sellion-nasion-B point angle measurements in humans, respectively. There is a set of reliable cephalometric landmarks and measurement angles pertinent for use within a translational large-animal model. These craniomaxillofacial landmarks will enable development of novel navigational software technology, improve cutting guide designs, and facilitate exploration of new avenues for investigation and collaboration.

  7. Photometric Evaluation of Soft Tissue Changes in CLP Patients: Le Fort I Advancement Osteotomy (ALO) Versus Anterior Maxillary Distraction (AMD).

    Science.gov (United States)

    Paulose, Joby; Markose, Eldho

    2014-12-01

    This paper is a comparative photometric evaluation of soft tissue changes in patients with CLP associated with maxillary deficiency treated with conventional Le Fort I advancement osteotomy (ALO) and anterior maxillary distraction (AMD). Twenty patients with maxillary hypoplasia associated with cleft lip and palate who had undergone either LeFort I osteotomy or distraction osteogenesis with maxillary advancement were included in this study. Frontal and profile photographs were used to ascertain the changes post-surgically. Photographs were obtained before treatment and 1 year after surgical correction in both groups. Vertical as well as horizontal changes in pronasale was well observed in both groups. A substantial increase in nasal parameters was noted in case of AMD group in comparison to ALO group. Though maxillary advancement was quite evident in AMD and ALO groups, a significant and consistent change was observed in AMD group. Significant vertical and horizontal changes were seen with respect to subnasale and labrale superius in AMD group. The hard and soft tissue changes produced by AMD by intra oral distractors were being evaluated so far. The results of the above studies have proved the excellence of AMD over conventional osteotomies. The present study goes hand in hand with the research outcomes till date.

  8. Assessment of Soil-Gas and Soil Contamination at the Former Military Police Range, Fort Gordon, Georgia, 2009-2010

    Science.gov (United States)

    Falls, W. Fred; Caldwell, Andral W.; Guimaraes, Wladmir B.; Ratliff, W. Hagan; Wellborn, John B.; Landmeyer, James E.

    2011-01-01

    Soil gas and soil were assessed for organic and inorganic contaminants at the former military police range at Fort Gordon, Georgia, from May to September 2010. The assessment evaluated organic contaminants in soil-gas samplers and inorganic contaminants in soil samples. This assessment was conducted to provide environmental contamination data to Fort Gordon pursuant to requirements of the Resource Conservation and Recovery Act Part B Hazardous Waste Permit process. Soil-gas samplers deployed and collected from May 20 to 24, 2010, identified masses above method detection level for total petroleum hydrocarbons, gasoline-related and diesel-related compounds, and chloroform. Most of these detections were in the southwestern quarter of the study area and adjacent to the road on the eastern boundary of the site. Nine of the 11 chloroform detections were in the southern half of the study area. One soil-gas sampler deployed adjacent to the road on the southern boundary of the site detected a mass of tetrachloroethene greater than, but close to, the method detection level of 0.02 microgram. For soil-gas samplers deployed and collected from September 15 to 22, 2010, none of the selected organic compounds classified as chemical agents and explosives were detected above method detection levels. Inorganic concentrations in the five soil samples collected at the site did not exceed the U.S. Environmental Protection Agency regional screening levels for industrial soil and were at or below background levels for similar rocks and strata in South Carolina.

  9. Maxillary distraction osteogenesis using Le Fort I osteotomy without intraoperative down-fracture.

    Science.gov (United States)

    Yamauchi, K; Mitsugi, M; Takahashi, T

    2006-06-01

    The aim of this study is to present a technique for maxillary distraction osteogenesis using Le Fort I osteotomy without down-fracture. Six cleft-related patients suffering from severe midfacial deficiency were treated with maxillary distraction osteogenesis. The RED II system was chosen as the extraoral device and the Leipzig retention plate system to anchor the maxillary segment. Maxillary distraction osteogenesis was successful in all cases. Cephalometric and clinical evaluation after an average follow-up period of 1 year showed stable results with respect to skeletal and dental relationships. The SNA angle increased from 72.3 degrees to 81.4 degrees and the ANB angle increased by 11.0 degrees immediately after removing the distraction device. After 1 year, the sagittal bone gain remained and the SNA angle had decreased by 0.8 degrees . This technique seems to minimize the risk of the surgical procedure and shorten the operation time. It may become an alternative method for the treatment of patients with severe midfacial hypoplasia.

  10. Preliminary assessment report for Fort Custer Training Center, Installation 26035, Augusta, Michigan

    International Nuclear Information System (INIS)

    Flaim, S.; Krokosz, M.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Michigan Army National Guard property near Augusta, Michigan. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Custer Training Center, phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations associated with the property are (1) storage of hazardous materials and hazardous waste, (2) storage and dispensing of fuel, (3) washing of vehicles and equipment, and (4) weapons training ranges that may have accumulated lead

  11. Radiochemical analysis of the first plateout probe from the Fort St. Vrain high-temperature gas-cooled reactor

    International Nuclear Information System (INIS)

    Burnette, R.D.

    1982-06-01

    This report presents the analysis of radioactive elements on the first plateout probe from the Fort St. Vrain high-temperature gas-cooled reactor. The plateout probe is a device which samples the primary coolant for condensible fission products. Circuit inventories of individual radionuclides are estimated from the probe analysis. The analysis shows that the radioactive contamination in the primary circuit is remarkable low, with activation product concentrations much greater than that of fission products. The analysis demonstrates that the concentrations of the key fission products I-131 and Sr-90 are far below the limits allowed by the technical specification

  12. Results of bald eagle, osprey and great blue heron nest site surveys near Fort MacKay, Alberta

    International Nuclear Information System (INIS)

    Strom, K.; Balagus, P.

    1996-01-01

    As part of the environmental impact assessment process, a study was conducted to assess the occurrence of bald eagle, osprey and great blue heron on Syncrude's proposed oil sand leases near Fort MacKay. The objective of the study was to determine the relative abundance, habitat preferences and nesting occurrences of these different birds. Aerial count surveys were conducted to include coverage of the shorelines of four rivers and 22 lakes. Breeding activities of the osprey, bald eagle and great blue heron were observed in the regional study area, but not in the local study area. 14 refs., 1 tab., 4 figs

  13. Characterization of seven United States coal regions. The development of optimal terrace pit coal mining systems

    Energy Technology Data Exchange (ETDEWEB)

    Wimer, R.L.; Adams, M.A.; Jurich, D.M.

    1981-02-01

    This report characterizes seven United State coal regions in the Northern Great Plains, Rocky Mountain, Interior, and Gulf Coast coal provinces. Descriptions include those of the Fort Union, Powder River, Green River, Four Corners, Lower Missouri, Illinois Basin, and Texas Gulf coal resource regions. The resource characterizations describe geologic, geographic, hydrologic, environmental and climatological conditions of each region, coal ranks and qualities, extent of reserves, reclamation requirements, and current mining activities. The report was compiled as a basis for the development of hypothetical coal mining situations for comparison of conventional and terrace pit surface mining methods, under contract to the Department of Energy, Contract No. DE-AC01-79ET10023, entitled The Development of Optimal Terrace Pit Coal Mining Systems.

  14. Stability of the anterior maxillary segment and teeth after segmental le fort I osteotomy and postoperative skeletal elastic fixation with or without occlusal splint.

    Science.gov (United States)

    Blæhr, Tue Lindberg; Jensen, Thomas; Due, Karen Margrethe; Neumann-Jensen, Bjarne

    2014-07-01

    To assess the short term dental and skeletal stability of the anterior maxillary segment after segmental Le Fort I osteotomy with postoperative skeletal elastic fixation with or without occlusal splint. 29 consecutive patients underwent segmental Le Fort I osteotomy and elastic skeletal fixation was applied. Patients were divided into two groups according to whether a fixed occlusal splint was used for six weeks (group A) or dismounted perioperatively (group B). Changes in landmarks and reference planes between the two timepoints were estimated on lateral cephalometric radiographs. The upper incisor had a mean intrusion of -0.56 mm (SD 0.77; range -2.04 to 1.08 mm) and a mean posterior movement of -0.93 mm (SD 1.03; range -2.52 to 0.96 mm). The mean change in the axial inclination of the upper incisor was -0.33° (SD 2.56; range -6° to 4°) (95% CI: -1.75 to 1.08°). Group B: The upper incisor had a mean intrusion of -0.13 mm (SD 1.36; range -1.92 to 3.6 mm) and a mean anterior movement of 0.11 mm (SD 1.78; range -2.88 to 3.84 mm). The mean change in the axial inclination of the upper incisor was -0.07° (SD 3.05; range -5° to 5°) (95% CI: -1.83 to 1.69°). There was no statistically significant difference in stability between the two groups at the P value 0.05. The skeletal anterior fixation with postoperative elastics for eight weeks may not compromise the early postoperative dental and skeletal stability of the anterior segment in segmental Le Fort I osteotomy.

  15. Stability of the Anterior Maxillary Segment and Teeth after Segmental Le Fort I Osteotomy and Postoperative Skeletal Elastic Fixation With or Without Occlusal Splint

    Directory of Open Access Journals (Sweden)

    Tue Lindberg

    2014-10-01

    Full Text Available Objectives: To assess the short term dental and skeletal stability of the anterior maxillary segment after segmental Le Fort I osteotomy with postoperative skeletal elastic fixation with or without occlusal splint. Material and Methods: 29 consecutive patients underwent segmental Le Fort I osteotomy and elastic skeletal fixation was applied. Patients were divided into two groups according to whether a fixed occlusal splint was used for six weeks (group A or dismounted perioperatively (group B. Changes in landmarks and reference planes between the two timepoints were estimated on lateral cephalometric radiographs. Results: Group A: The upper incisor had a mean intrusion of -0.56 mm (SD 0.77; range -2.04 to 1.08 mm and a mean posterior movement of -0.93 mm (SD 1.03; range -2.52 to 0.96 mm. The mean change in the axial inclination of the upper incisor was -0.33° (SD 2.56; range -6° to 4° (95% CI: -1.75 to 1.08°. Group B: The upper incisor had a mean intrusion of -0.13 mm (SD 1.36; range -1.92 to 3.6 mm and a mean anterior movement of 0.11 mm (SD 1.78; range -2.88 to 3.84 mm. The mean change in the axial inclination of the upper incisor was -0.07° (SD 3.05; range -5° to 5° (95% CI: -1.83 to 1.69°. There was no statistically significant difference in stability between the two groups at the P value 0.05. Conclusions: The skeletal anterior fixation with postoperative elastics for eight weeks may not compromise the early postoperative dental and skeletal stability of the anterior segment in segmental Le Fort I osteotomy.

  16. Aerial gamma ray and magnetic survey: Mississippi and Florida airborne survey, Fort Smith quadrangle, Oklahoma, and Arkansas. Final report

    International Nuclear Information System (INIS)

    1980-09-01

    The Fort Smith quadrangle in western Arkansas and eastern Oklahoma overlies thick Paleozoic sediments of the Arkoma Basin. These Paleozoics dominate surface exposure except where covered by Quaternary Alluvial materials. Examination of available literature shows no known uranium deposits (or occurrences) within the quadrangle. Seventy-five groups of uranium samples were defined as anomalies and are discussed briefly. None were considered significant, and most appeared to be of cultural origin. Magnetic data show character that suggest structural and/or lithologic complexity, but imply relatively deep-seated sources

  17. Lip-nasal aesthetics following Le Fort I osteotomy.

    Science.gov (United States)

    Rosen, H M

    1988-02-01

    Forty-one patients undergoing Le Fort I osteotomy for superior and/or anterior repositioning of the maxilla were prospectively studied for changes in soft-tissue morphology of the nasomaxillary region. Nasal parameters studied were changes in interalar rim width and nasal tip projection. It was observed that alar rim width increases with anterior and/or superior repositioning of the maxilla, but increases in nasal tip projection occur only when there is an anterior vector of maxillary movement. These nasal changes could not be quantitatively correlated to magnitude of maxillary movement. Lip changes studied were the horizontal displacement at the vermilion border and subnasale versus that of the incisal edge and point A, respectively, when the maxilla is sagittally advanced and the vertical shortening of the lip versus that of the incisal edge when the maxilla is shortened. Using linear regression analysis, horizontal displacement of the upper lip at the vermilion border was 0.82 +/- 0.13 mm for every 1 mm of maxillary advancement at the incisal edge (p less than 0.001) and 0.51 +/- 0.13 at the subnasale for every 1 mm of maxillary advancement at point A (p less than 0.001). Eighty percent of patients undergoing maxillary intrusive procedures had lip shortening ranging from 20 to 50 percent of the vertical maxillary reduction. Surprisingly, no statistically significant correlation could be demonstrated for lip shortening versus extent of vertical maxillary reduction. Previous literature in disagreement with these findings is discussed. Guidelines for treatment planning utilizing these data are suggested.

  18. 77 FR 62601 - United States Department of Energy and United States Department of Defense v. Baltimore & Ohio...

    Science.gov (United States)

    2012-10-15

    ... available for viewing and self-copying at the Board's Public Docket Room, Room 131, and will be posted to... (3) Jill K. Mulligan, BNSF Railway Company, 2500 Lou Menk Drive, AOB-3, Fort Worth, TX 76131. FOR... fuel, other high level radioactive wastes, and the empty containers (casks) and buffer and escort cars...

  19. Laboratory electrical resistivity analysis of geologic samples from Fort Irwin, California: Chapter E in Geology and geophysics applied to groundwater hydrology at Fort Irwin, California

    Science.gov (United States)

    Bloss, Benjamin R.; Bedrosian, Paul A.

    2015-01-01

    Correlating laboratory resistivity measurements with geophysical resistivity models helps constrain these models to the geology and lithology of an area. Throughout the Fort Irwin National Training Center area, 111 samples from both cored boreholes and surface outcrops were collected and processed for laboratory measurements. These samples represent various lithologic types that include plutonic and metamorphic (basement) rocks, lava flows, consolidated sedimentary rocks, and unconsolidated sedimentary deposits that formed in a series of intermountain basins. Basement rocks, lava flows, and some lithified tuffs are generally resistive (≥100 ohm-meters [Ω·m]) when saturated. Saturated unconsolidated samples are moderately conductive to conductive, with resistivities generally less than 100 Ω·m, and many of these samples are less than 50 Ω·m. The unconsolidated samples can further be separated into two broad groups: (1) younger sediments that are moderately conductive, owing to their limited clay content, and (2) older, more conductive sediments with a higher clay content that reflects substantial amounts of originally glassy volcanic ash subsequently altered to clay. The older sediments are believed to be Tertiary. Time-domain electromagnetic (TEM) data were acquired near most of the boreholes, and, on the whole, close agreements between laboratory measurements and resistivity models were found. 

  20. New interpretations of the Fort Clark State Historic Site based on aerial color and thermal infrared imagery

    Science.gov (United States)

    Heller, Andrew Roland

    The Fort Clark State Historic Site (32ME2) is a well known site on the upper Missouri River, North Dakota. The site was the location of two Euroamerican trading posts and a large Mandan-Arikara earthlodge village. In 2004, Dr. Kenneth L. Kvamme and Dr. Tommy Hailey surveyed the site using aerial color and thermal infrared imagery collected from a powered parachute. Individual images were stitched together into large image mosaics and registered to Wood's 1993 interpretive map of the site using Adobe Photoshop. The analysis of those image mosaics resulted in the identification of more than 1,500 archaeological features, including as many as 124 earthlodges.

  1. Evaluating the Least Cost Selection of Agricultural Management Practices in the Five Mile Creek area of Fort Cobb Watershed, Oklahoma, USA

    Science.gov (United States)

    Rasoulzadeh Gharibdousti, S.; Stoecker, A.; Storm, D.

    2017-12-01

    One of the main causes of water quality impairment in the United States is human induced Non-Point Source (NPS) pollution through intensive agriculture. The Fort Cobb Reservoir (FCR) watershed located in west-central Oklahoma, United States is a rural agricultural catchment with known issues of NPS pollution including suspended solids, siltation, nutrients, and pesticides. Recently, several Best Management Practices (BMPs) have been implemented in the watershed (such as no-tillage and cropland to grassland conversion) to improve water quality. The objective in this study is to estimate the most cost effective selection and placement of BMPs on farmlands to mitigate soil erosion and the delivery of sediment and nutrient loads to the FCR from Five Mile Creek (FMC) area of the FCR watershed. We employed the Soil and Water Assessment Tool (SWAT) to develop the hydrological model of the study area. The watershed was delineated using the 10 m National Elevation Dataset and divided into 43 sub-basins with an average area of 8 km2. Through a combination of Soil Survey Geographic Database- SSURGO soil data, the US Department of Agriculture crop layer and the slope information, the watershed was further divided into 15,217 hydrologic response units (HRUs). The historical climate pattern in the watershed was represented by two different weather stations. The model was calibrated for the 1991 - 2000 period and validated over the 2001 - 2010 period against the monthly USGS observations of streamflow and suspended sediment concentration recorded at the watershed outlet. Model parametrization resulted in satisfactory values for the R2 (0.64, 0.35) and NS (0.61, 0.34) in calibration period and an excellent model performance (R2 = 0.79, 0.38; NS = 0.75, 0.43) in validation period for streamflow and sediment concentration respectively. We have selected 20 BMPs to estimate their efficacy in terms of water, sediment, and crop yields. Linear Programming (LP) was used to determine the

  2. Maintenance - a design perspective

    International Nuclear Information System (INIS)

    Hedges, K.R.

    1992-01-01

    The paper describes how the CANDU-3 has incorporated, at the design stage, maintenance requirements such as component accessibility, standardization, ease of replacement, reduction in the number of components, and simplified component design. AECL is also active in the planned rehabilitation of the four units at Ontario Hydro's Bruce A nuclear generating station. In addition to conceptual design and development, detailed design and analysis, procurement and site assistance, AECL's Sheridan Park Laboratory will provide important development and mockup facilities. An AECL research and development program on reactor maintenance includes the identification and characterization of aging and degrading mechanisms, the tailoring of developed products to plant requirements, and the identification of areas of international cooperation and information exchange. 3 tabs., 1 fig

  3. Tourism, Tolerance, or Hospitality? An Assessment of a Native/Non-Native, Urban/Rural Youth Exchange Program between Fort Good Hope, NWT, and East Vancouver, BC

    Science.gov (United States)

    Hern, Matt

    2009-01-01

    This article considers and assesses a youth exchange project between two community-based youth centers: The Purple Thistle Centre in East Vancouver, British Columbia, and the K'asho Got'ine Youth Centre in Fort Good Hope, Northwest Territories. Both centers serve primarily low-income youth, but after that the similarities are very few. The…

  4. Trends and demographics in hip arthroscopy in the United States.

    Science.gov (United States)

    Montgomery, Scott R; Ngo, Stephanie S; Hobson, Taylor; Nguyen, Shawn; Alluri, Ram; Wang, Jeffrey C; Hame, Sharon L

    2013-04-01

    The purpose of this study was to evaluate the trends and report on the demographics of patients undergoing hip arthroscopy in the United States. Patients who underwent hip arthroscopy from 2004 to 2009 were identified by searching Current Procedural Terminology codes in the PearlDiver Patient Records Database (PearlDiver Technologies, Fort Wayne, IN), a national database of orthopaedic insurance records. The year of procedure, age, gender, and region of the United States were recorded for each patient. Results were reported for each variable as the incidence of procedures identified per 10,000 patients searched in the database. In total, 3,447 cases of hip arthroscopy were identified between 2004 and 2009. The incidence of procedures increased significantly over the study period, from 1.20 cases per 10,000 patients in 2004 to 5.58 in 2009 (P arthroscopy was performed most commonly in patients aged 20 to 39 years (P arthroscopy was observed in the Western region with an incidence of 5.24 cases identified compared with 2.94, 2.70, and 2.56 in the Northeast, Midwest, and South, respectively (P arthroscopy was observed in the examined cohort of patients between 2004 and 2009. The majority of cases were performed in patients aged 20 to 39 years, with no difference in gender. The Western region of the United States was found to have a higher incidence of hip arthroscopy compared with the Midwest, South, and Northeast. Level IV, cross-sectional study. Copyright © 2013 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.

  5. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Mark D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kreyling, Sean J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schneider, Kevin P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  6. Hvorfor faldt de fra? Fortællinger om frafald på Global Studies

    DEFF Research Database (Denmark)

    Keiding, Tina Bering; Petersen, Sarah

    2015-01-01

    Rapporten formidlerresultaterne af en mindre kvalitativ undersøgelse af studerendes overvejelser og begrundelser for studieskift/-ophør på Globale Studier, Aarhus Universitet. Formålet er at få indblik i de faktorer, de studerende oplever, som afgørende for studieskift/-ophør. Rapporten er...... udarbejdet af Center for Undervisningsudvikling og Digitale Medier (CUDiM), Aarhus Universitet. Undersøgelsen er initieret af Globale Studier, som et led i en strategisk indsats for at minimere frafaldet på uddannelserne. Notatet bekræfter forskningens pointer om at frafald er et komplekst fænomen, og at den......, Sommersel, & Søgaard Larsen 2013). Specifikt i forhold til Globale Studier peger undersøgelsen på både interne og eksterne forhold. Centrale temaer i de studerendes fortællinger er: Manglende karrierefortællinger, og udfordringer i spændingsfeltet mellem beskeden sproglig progression, en stor arbejdsindsats...

  7. Postirradiation examination and evaluation of Fort St. Vrain fuel element 1-0743

    International Nuclear Information System (INIS)

    Saurwein, J.J.; Miller, C.M.; Young, C.A.

    1981-05-01

    Fort St. Vrain (FSV) fuel element 1-0743 was irradiated in core location 17.04.F.06 from July 3, 1976 until February 1, 1979. The element experienced an average fast neutron exposure of about 0.95 x 10 25 n/m 2 (E > 29 fJ)/sub HTGR/, a time-and-volume-averaged fuel temperature in the vicinity of 680 0 C, fissile and fertile particle burnups of approximately 6.2% and 0.3%, respectively, and a total burnup of 12,210 MWd/tonne. The postirradiation examination revealed that the element was in excellent condition. No cracks were observed on any of the element surfaces. The structural integrity of the fuel rods was good. No evidence of mechanical interaction between the fuel rods and fuel body was observed. Calculated irradiation parameters obtained with HTGR design codes were compared with measured data. Radial and axial power distributions, irradiation temperatures, neutron fluences, and fuel burnups were in good agreement with measurements. Calculated fuel rod strains were about a factor of three greater than were observed

  8. Ecological Effects of Channelization on a Tropical Marine Ecosystem

    African Journals Online (AJOL)

    USER

    important factor limiting usable fish habitat in such systems (Judy et al., 1984; Sheridan et al., 2002). ... affects fish nutrition and reproduction is critical, because the primary effects of ..... To measure the environmental effect of the sedimentation.

  9. Hiérarchie des esprits et esprit fort : le discours médical

    Directory of Open Access Journals (Sweden)

    Isabelle Moreau

    2010-05-01

    Full Text Available L’esprit fort a-t-il un sexe au début de l’époque moderne ? Selon Londa Schiebinger (The Mind has no sex?, 1989 le cartésianisme rompt avec la tradition médicale en rendant impossible la liaison entre sexe et tempérament. En témoigne notamment le cartésien Poullain de la Barre et son livre De l’égalité des deux sexes, publié en 1673. C’est à la lumière de cette thèse que je voudrais évaluer la position des libertins érudits, et ainsi aborder la question du genre masculin, dans sa relation supposée privilégiée à l’incrédulité et au rejet des superstitions. Pour La Mothe Le Vayer, Naudé ou encore Cyrano, en effet, il n’existe pas de raison universelle « asexuée ». Ces libertins rejettent le dualisme cartésien et disqualifient la notion même de sens commun, pour mieux promouvoir une faculté de bien juger ou « Ingenium », directement héritée de Charron. Pour comprendre la masculinité de l’esprit fort, il faut ainsi revenir aux origines médicales de la hiérarchie entre les esprits, construite à partir de l’ancienne théorie humorale et tempéramentale héritée de Hippocrate, Aristote et Galien, retravaillée par Huarte en 1575, reprise ensuite par Charron et par sa postérité libertine. En revenant sur les discours médicaux et philosophiques qui construisent la masculinité de l’esprit fort, je montrerai comment cet idéal se construit sur un modèle de masculinité monologique (certes capable de degrés et de variations, plutôt que par opposition au féminin.Did the mind have a gender during the Early Modern period? According to Londa Schiebinger (The Mind Has No Sex?, 1989, Cartesian philosophy caused an abrupt change within the medical tradition by rendering the link between gender and temperament obsolete. Poullain de la Barre’s On the Equality of the Sexes, published in 1673, is a good example of this shift. It is in the light of this thesis that I intend to assess the Libertine

  10. An overview of the 2009 Fort Hood Robotics Rodeo

    Science.gov (United States)

    Norberg, Seth

    2010-04-01

    The Robotics Rodeo held from 31 August to 3 September 2009 at Fort Hood, Texas, had three stated goals: educate key decision makers and align the robotics industry; educate Soldiers and developers; and perform a live market survey of the current state of technologies to encourage the development of robotic systems to support operational needs. Both events that comprised the Robotics Rodeo, the Extravaganza and the robotic technology observation, demonstration and discussion (RTOD2) addressed these stated goals. The Extravaganza was designed to foster interaction between the vendors and the visitors who included the media, Soldiers, others in the robotics industry and key decision makers. The RTOD2 allowed the vendors a more private and focused interaction with the subject matter experts teams, this was the forum for the vendors to demonstrate their robotic systems that supported the III Corps operational needs statements that are focused on route clearance, convoy operations, persistent stare, and robotic wingman. While the goals of the Rodeo were achieved, the underlying success from the event is the development of a new business model that is focused on collapsing the current model to get technologies into the hands of our warfighters quicker. This new model takes the real time data collection from the Rodeo, the Warfighter Needs from TRADOC, the emerging requirements from our current engagements, and assistance from industry partners to develop a future Army strategy for the rapid fielding of unmanned systems technologies.

  11. Habitat Restoration/Enhancement Fort Hall Reservation : 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Osborne, Hunter [Shoshone Bannock Tribes

    2009-07-23

    Habitat enhancement, protection and monitoring were the focus of the Resident Fisheries Program during 2008. Enhancement and protection included sloping, fencing and planting wetlands plugs at sites on Spring Creek (Head-waters). Many previously constructed instream structures (rock barbs and wing dams) were repaired throughout the Fort Hall Indian Reservation (Reservation). Physical sampling during 2008 included sediment and depth measurements (SADMS) in Spring Creek at the Car Removal site. SADMS, used to track changes in channel morphology and specifically track movements of silt through Bottoms stream systems were completed for 5 strata on Spring Creek. Water temperature and chemistry were monitored monthly on Spring Creek, Clear Creek, Diggie Creek, and Portneuf (Jimmy Drinks) and Blackfoot rivers. Fish population densities and biomass were sampled in five reservation streams which included nine sites. Sampling protocols were identical to methods used in past years. Numbers of fish in Spring Creek series remained relatively low, however, there was an increase of biomass overall since 1993. Salmonid fry densities were monitored near Broncho Bridge and were similar to 2006, and 2007, however, as in years past, high densities of macrophytes make it very difficult to see fry in addition to lack of field technicians. Mean catch rate by anglers on Bottoms streams stayed the same as 2007 at 1.5/hr. Numbers of fish larger than 18-inches caught by anglers increased from 2007 at .20 to .26/hr.

  12. 17 CFR 200.303 - Times, places and requirements for requests pertaining to individual records in a record system...

    Science.gov (United States)

    2010-04-01

    ... Operations, SEC, 100 F Street, NE., Washington, DC 20549, during normal business hours of 9 a.m. to 5:30 p.m... business hours of those offices are listed below: Atlanta Regional Office—3475 Lenox Road, NE., Suite 1000.... M.T. Fort Worth Regional Office—Burnett Plaza, Suite 1900, 801 Cherry Street, Unit #18, Fort Worth...

  13. Contrasting eruption styles of the 147 Kimberlite, Fort à la Corne, Saskatchewan, Canada

    Science.gov (United States)

    Lefebvre, Nathalie; Kurszlaukis, Stephan

    2008-06-01

    The Cretaceous Fort à la Corne (FALC) kimberlite field was active over a time span of ~ 20 Ma with contemporaneous terrestrial (Mannville Group) to marine (Lower Colorado Group) background sedimentation. Steep-sided pipes, craters and positive landform volcanoes such as scoria or tuff cones are thought to have formed during that period. The 147 Kimberlite is located in the SE section of the field's main cluster and is part of the large (~ 377.5 ha) Orion North volcanic complex. Based on logging of 25 drill cores, the morphology of the country rock/kimberlite interface suggests excavation of a complex crater field down to the upper portion of the Mannville Group sedimentary deposits. At least two types of volcaniclastic deposits are identified: a main kimberlite unit that is typically characterized by crustal xenolith-poor (1-2%), normal graded beds possibly deposited as turbidites in a subaqueous environment, originating from the nearby 148 tephra cone and infilling the adjacent 147 crater, and a second unit, located on the NE margin of the 147 Kimberlite, that represents a thick (~ 60 m) sequence of large (up to 22 m) sedimentary country rock blocks located at least 60 m above their original stratigraphic position. We suggest the following time sequence of events: Crater excavation as a consequence of a shallow magma fragmentation level within the uppermost country rock sequences, together with several closely spaced eruptive centres initially formed the complex, intercalated crater field. Subsequently, ongoing eruptions with a fragmentation level above the country rock produced the lithic fragment poor main infill of the 148 Kimberlite. Resedimentation from the outer flanks of the 148 tephra cone resulted in the deposition of turbidites in the 147 area. A consolidation phase solidified the lowermost portion of the main infill in 147. A subsequent explosion(s) occurred within the Mannville Group in the 147 area, ejecting large blocks of sedimentary country rocks

  14. 77 FR 56652 - Notice of Service Delivery Area Designation for the Mashpee Wampanoag Indian Tribe

    Science.gov (United States)

    2012-09-13

    ... program depending on the availability of funds, the person's relative medical priority, and the actual..., Reservation, Wyoming. Sublette, WY. Aroostook Band of Micmac Indians of Aroostook, ME.\\3\\ Maine. Assiniboine..., MT, Montana. Sheridan, MT, Valley, MT. [[Page 56653

  15. Unità di conto di bilancio.

    Directory of Open Access Journals (Sweden)

    R. VALCAMONICI

    2014-09-01

    Full Text Available La principale conclusione che si ricava dall’articolo mostra che l’aggravio che deriverebbe ai paesi a moneta debole dalla introduzione dell’UCE e, alternativamente, il vantaggio in favore dei paesi a moneta forte, sono destinati a livellarsi a partire dal 1978 in conseguenza dell’applicazione integrale del sistema delle risorse proprie e della maggiore partecipazione dei nuovi Stati menbri.

  16. Developmental assessment of the Fort St. Vrain version of the Composite HTGR Analysis Program (CHAP-2)

    International Nuclear Information System (INIS)

    Stroh, K.R.

    1980-01-01

    The Composite HTGR Analysis Program (CHAP) consists of a model-independent systems analysis mainframe named LASAN and model-dependent linked code modules, each representing a component, subsystem, or phenomenon of an HTGR plant. The Fort St. Vrain (FSV) version (CHAP-2) includes 21 coded modules that model the neutron kinetics and thermal response of the core; the thermal-hydraulics of the reactor primary coolant system, secondary steam supply system, and balance-of-plant; the actions of the control system and plant protection system; the response of the reactor building; and the relative hazard resulting from fuel particle failure. FSV steady-state and transient plant data are being used to partially verify the component modeling and dynamic smulation techniques used to predict plant response to postulated accident sequences

  17. Modern (1992–2011) and projected (2012–99) peak snowpack and May–July runoff for the Fort Peck Lake and Lake Sakakawea watersheds in the Upper Missouri River Basin

    Science.gov (United States)

    Stamm, John F.; Todey, Dennis; Mayes Bousted, Barbara; Rossi, Shawn; Norton, Parker A.; Carter, Janet M.

    2016-02-09

    Mountain snowpack is an important contributor to runoff in the Upper Missouri River Basin; for example, high amounts of winter and spring precipitation in the mountains and plains in 2010–11 were associated with the peak runoff of record in 2011 in the Upper Missouri River Basin. To project trends in peak mountain snowpack and runoff in the upcoming decades, multiple linear regression models of peak mountain snowpack and total May–July runoff were developed for the Fort Peck Lake (above Fort Peck Dam) and lower Lake Sakakawea watersheds (between Fort Peck and Garrison Dams) in the Upper Missouri River Basin. Input to regression models included seasonal estimates of precipitation, air temperature, and total reference evapotranspiration stratified by elevation. Calibration was based on records from 107 weather stations from 1991 to 2011. Regressed annual peak mountain snowpack was used as input to the transfer function of May–July runoff. Peak snowpack and May–July runoff were projected for 2012–99 on the basis of air temperature and precipitation from the Community Climate System Model (CCSM) output. Two estimates of projected peak snowpack and May–July runoff for 2012–99 were computed: one estimate was based on output from the CCSM, version 3.0 (CCSM3), and the second estimate was based on output from the CCSM, version 4.0 (CCSM4). The significance of projected trends was based on the Kendall’s tau nonparametric test.

  18. Primary invasive carcinoma of the vagina after Le Fort partial colpocleisis for stage IV pelvic organ prolapse: a case report.

    Science.gov (United States)

    Cho, Moon Kyoung; Kim, Chul Hong; Kim, Yoon Ha

    2011-11-01

    We present here the case report of a postmenopausal woman who complained of recurrent pus-like vaginal discharge and perianal pain 1 year after Le Fort colpocleisis, which was subsequently identified as a primary invasive carcinoma of the vagina. Biopsy confirmed a squamous cell carcinoma in the vagina, and the disease was classified as stage III according to FIGO staging. The patient received pelvic radiotherapy. This case emphasizes that differential diagnosis of recurrent vaginal discharge that presents remote from obliterative procedure for pelvic organ prolapse should consider not only pyometra, but also other causes.

  19. Kahvata, Kivisildnik / Udo Uibo

    Index Scriptorium Estoniae

    Uibo, Udo, 1956-

    2011-01-01

    Ajalehe "The Telegraph" teatel on keegi Sheridan Simove üllitanud ainult valgetest lehtedest koosneva raamatu "Millest muust peale seksi mõtlevad mehed" (What every man thinks about apart from sex), mis on mingis mõttes analoogne Sven Kivisildniku üllitisega "Kutse"

  20. Kahvata, Kivisildnik / Udo Uibo

    Index Scriptorium Estoniae

    Uibo, Udo, 1956-

    2016-01-01

    Ajalehe "The Telegraph" teatel on keegi Sheridan Simove üllitanud ainult valgetest lehtedest koosneva raamatu "Millest muust peale seksi mõtlevad mehed" (What every man thinks about apart from sex), mis on mingis mõttes analoogne Sven Kivisildniku üllitisega "Kutse"

  1. Nondestructive examination of 54 fuel and reflector elements from Fort St. Vrain core segment 2

    International Nuclear Information System (INIS)

    Saurwein, J.J.

    1982-10-01

    Fifty-four fuel and reflector elements irradiated in core segment 2 of the Fort St. Vrain high-temperature gas-cooled reactor (HTGR) were nondestructively examined. The time- and volume-averaged graphite irradiation temperatures for the elements ranged from approx. 350 0 to 750 0 C. The element-averaged fast neutron fluences ranged from approx. 0.2 to 1.6 x 10 25 n/m 2 (E > 29 fJ)/sub HTGR/. The elements, except for two fuel elements in which single localizeed cracks developed during irradiation, were in excellent condition. No evidence was observed of significant graphite oxidation or mechanical interaction beween elements. The cracks in the two elements did not affect their performance or handling. These elements were, otherwise, in excellent condition. Nearly all elements shrank in both the axial and radial directions, but the dimensional changes were relatively small

  2. Quitosana no controle pós-colheita da podridão mole em caqui 'rama forte' Chitosan on the postharvest control of soft rot in 'rama forte' persimmon

    Directory of Open Access Journals (Sweden)

    Patrícia Cia

    2010-01-01

    Full Text Available Este trabalho objetivou avaliar o efeito da quitosana, aliada ao processo de destanização, no controle de Rhizopus stolonifer em caqui 'Rama Forte' e sobre o crescimento micelial do fungo in vitro. Caquis foram submetidos ao processo de destanização com CO2 (70% / 18 horas, em tambores herméticos, sendo em seguida submetidos à inoculação com suspensão de esporos de R. stolonifer (3x10(5 esporos mL-1. Após inoculação, os frutos permaneceram por 2 horas a 25 °C, quando foram imersos em quitosana (0; 0,5; 1,0; 1,5 e 2,0%, por 1 minuto. Os frutos foram mantidos a 25 °C / 80% UR e avaliados quanto à severidade e incidência da podridão mole, durante cinco dias. Após o período de armazenamento, avaliaram-se a coloração de casca, a firmeza e o índice de adstringência. In vitro, avaliou-se o crescimento micelial em placas contendo meio BDA incorporado com quitosana ou ácido cítrico. Os resultados mostraram que a quitosana, a 1,5%, reduz a severidade e a incidência da podridão mole em caquis e não influencia no processo de perda de adstringência, firmeza e na coloração de casca. In vitro, a quitosana inibe completamente o crescimento micelial de R. stolonifer, em concentração tão baixa quanto 0,5%.The objective of this research was to evaluate the effect of chitosan in addition to de-astringency process on the control of Rhizopus stolonifer in 'Rama Forte' persimmon and on in vitro mycelial growth. Persimmon were submitted to de-astringency process using CO2 (70% / 18 h, in hermetic chambers. Next, fruit were inoculated through subcuticular injections of a R. stolonifer spore suspension (3x10(5 spore mL-1 and 2 hours later at 25 °C immersed into chitosan (0, 0.5, 1.0, 1.5, and 2.0%, for 1 min. Fruit were stored at 25 °C / 80% RH, and checked for rot severity and incidence of soft rot, during 5-days of storage. After storage the skin color, firmness and astringency index were evaluated in persimmons. In vitro, mycelial

  3. Cultural keystone species in oil sands reclamation, Fort McKay, Alberta, Canada

    Energy Technology Data Exchange (ETDEWEB)

    Garibaldi, A.; Straker, J. [Stantec Consulting Ltd., Surrey, BC (Canada)

    2009-12-15

    This presentation discussed a reclamation project conducted in Fort McKay, Alberta that was designed to address some of the social and cultural concerns related to oil sands mining in the region. Conventional reclamation practices in the region have demonstrated a lack of communication and participation from surrounding communities. The project was designed to address future land use plans and to include cultural values in the reclamation process. An integrative approach was used to address community landscapes issues and to explore methods of reclaiming the social and ecological components impacted by oil sands development. Traditional environmental knowledge was also incorporated into the program's design. Cultural keystone species (CKS) were used to provide a culturally relevant compass to guide people engaging in long-term reclamation and land use planning. Cultural keystone species were defined as salient species that significantly shape the cultural identity of a people. Keystone species in the region include the beaver; the moose; the ratroot; and cranberries and blueberries. Challenges to the program included the fact that the scale of oil sands disturbances are so immense that some community recommendations for reclaiming CKS may be impractical. tabs., figs.

  4. Analysis of Tourists Preferences on Smart Tourism in Yogyakarta (Case: Vredeburg Fort Museum)

    Science.gov (United States)

    Amanda, Rima; Santosa, PInsap; Nur Rizal, M.

    2018-04-01

    Smart tourism is a supporting system of an individual tourism in the terms of a comprehensive and integrated information and technology service. An educational tourist destination such as a museum is expected to present an informative and interactive atmosphere. Vredeburg Fort Museum as one of the tourist destinations in Yogyakarta begins to lose its visitors. The lack of interest of public towards the museum and the assumption that the museum is an ancient, less well maintained, and boring place become main obstacles in attracting tourists. This research aims to find the important factors becoming the preferences of tourists to visit the Vredeburg Museum in Yogyakarta. The research method used is the Principal Component Analysis. The analysis shows there are four main factors with eigenvalue more than 1, i.e. the first factor of 8,623, the second factor of 1,920, the third factor of 1,175, and the fourth factor of 1.082. Those four factors are the result of the grouping of 20 preference determinant variables.

  5. Data-Driven Modeling of Target Human Behavior in Military Operations

    Science.gov (United States)

    2014-03-12

    Military Operations Elizabeth Mezzacappa, Ph.D. Gordon Cooke, MEME Gladstone Reid, MSBMS Robert DeMarco, MSBMS Charles Sheridan BA John...stress, and human behavior modeling and simulation issues. GORDON COOKE, MEME , is a Principal Investigator at the TBRL. He was also a Chief

  6. Computed tomographic analysis of temporal maxillary stability and pterygomaxillary generate formation following pediatric Le Fort III distraction advancement.

    Science.gov (United States)

    Hopper, Richard A; Sandercoe, Gavin; Woo, Albert; Watts, Robyn; Kelley, Patrick; Ettinger, Russell E; Saltzman, Babette

    2010-11-01

    Le Fort III distraction requires generation of bone in the pterygomaxillary region. The authors performed retrospective digital analysis on temporal fine-cut computed tomographic images to quantify both radiographic evidence of pterygomaxillary region bone formation and relative maxillary stability. Fifteen patients with syndromic midface hypoplasia were included in the study. The average age of the patients was 8.7 years; 11 had either Crouzon or Apert syndrome. The average displacement of the maxilla during distraction was 16.2 mm (range, 7 to 31 mm). Digital analysis was performed on fine-cut computed tomographic scans before surgery, at device removal, and at annual follow-up. Seven patients also had mid-consolidation computed tomographic scans. Relative maxillary stability and density of radiographic bone in the pterygomaxillary region were calculated between each scan. There was no evidence of clinically significant maxillary relapse, rotation, or growth between the end of consolidation and 1-year follow-up, other than a relatively small 2-mm subnasal maxillary vertical growth. There was an average radiographic ossification of 0.5 mm/mm advancement at the time of device removal, with a 25th percentile value of 0.3 mm/mm. The time during consolidation that each patient reached the 25th percentile of pterygomaxillary region bone density observed in this series of clinically stable advancements ranged from 1.3 to 9.8 weeks (average, 3.7 weeks). There was high variability in the amount of bone formed in the pterygomaxillary region associated with clinical stability of the advanced Le Fort III segment. These data suggest that a subsection of patients generate the minimal amount of pterygomaxillary region bone formation associated with advancement stability as early as 4 weeks into consolidation.

  7. The Fort McMurray Demonstration Project in social marketing: health- and safety-related behaviour among oil sands workers.

    Science.gov (United States)

    Guidotti, T L; Watson, L; Wheeler, M; Jhangri, G S

    1996-08-01

    This is the first round in a series of surveys conducted in Fort McMurray as part of the Fort McMurray Demonstration Project in social marketing. This component of the survey was intended to focus on the most prominent group of employed workers in the community and to compare their patterns of response with the community as a whole. Respondents to the survey were overwhelmingly male (96%), married (72.9%) and living in households of two to five persons (87.9%). They were predominantly aged 30-44 (55%) and graduates of high school (53.5%). Younger male workers (below age 30) were more likely to have a high school diploma (78.3%) or some additional technical or vocational training (21.7% compared to 12.5% overall) and to be unmarried or separated. Attitudes toward safety-related behaviours were stronger than for respondents from the community as a whole. Approximately 70-100% of all age groups and both sexes showed strong agreement with attitudes involving child car seats and the unacceptability of drinking and driving. These attitudes include strong advocacy of vigorous enforcement of occupational health and safety standards. However, they showed a variability similar to the community as a whole in behaviour at home compared to work, generally reporting more consistent use of personal protection on the job than in their own homes, particularly hearing protection. Even so, they were much less likely to perform stretching and warm-up exercises prior to exertion than community residents in general. The potential may exist to transfer the technology and attitudes from workplace health and safety to community safety. One possible strategy to accomplish this is to involve workers in this industry directly in community initiatives. This strategy may be generalizable to any community in which there are major employers who place a heavy emphasis on risk control and occupational health and safety.

  8. Echo 2: observations at Fort Churchill of a 4-keV peak in low-level electron precipitation

    International Nuclear Information System (INIS)

    Arnoldy, R.L.; Hendrickson, R.A.; Winckler, J.R.

    1975-01-01

    The Echo 2 rocket flight launched from Fort Churchill, Manitoba, offered the opportunity to observe high-latitude low-level electron precipitation during quiet magnetic conditions. Although no visual aurora was evident at the time of the flight, an auroral spectrum sharply peaked at a few keV was observed to have intensities from 1 to 2 orders of magnitude lower than peaked spectra typically assoicated with bright auroral forms. There is a growing body of evidence that relates peaked electron spectra to discrete aurora. The Echo 2 observations show that whatever the mechanism for peaking the electron spectrum in and above discrete forms, it operates over a range of precipitation intensities covering nearly 3 orders of magnitude down to subvisual or near subvisual events

  9. High-Efficiency Housing at the Fort Peck Indian Reservation: Opportunities and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Lisell, Lars J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Desai, Jal D [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dean, Jesse D [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Rehder, Tim [U.S. Environmental Protection Agency (EPA), Region 8

    2018-03-13

    This project was initiated to provide design assistance in an effort to maximize energy performance for affordable housing at the Fort Peck Indian Reservation near Poplar, Montana. The Make It Right Foundation (MIRF) built 20 high performing homes (LEED Platinum) in 2015 and 2016 with three (3) different design options. NREL and EPA set out to provide energy analysis along with measurement and verification (M and V) of the homes to characterize energy use and provide clarity for future decision making with regard to tribal housing options. The results included herein summarize the energy end uses and documents projected energy impacts from various aspects of the MIRF home designs and construction. This report includes an analysis of energy use in 5 MIRF homes, comparing energy use across the different styles and configurations. Energy models were created for the 2 styles of MIRF homes, including renewable energy assessment for photovoltaic (PV) systems. Existing tribal housing has also been analyzed, with 5 housing units being analyzed for energy use and an energy model being created for 1 housing unit. The findings of this study highlight many of the challenges that arise when attempting to construct high performance housing in a region where such construction practices are still relatively rare. Homes in Poplar are well designed and, for the most part, and include climate specific design considerations appropriate for northeastern Montana. The most significant issues identified in MIRF homes were related to the work done to put the homes on the foundation, insulate the crawlspaces, and do final connection with the utilities. The Taxed II Credit homes are well designed and well suited to northeastern Montana, and with slight modifications to the design and construction could be very efficient. All occupant comfort and energy usage issues that were identified during the site visits can be remedied through retrofit measures that are relatively inexpensive. Energy

  10. Combined orthognathic distraction procedure: Le Fort I maxillary osteotomy and mandibular curvilinear distraction osteogenesis. A new technique for craniofacial management.

    Science.gov (United States)

    Schendel, Stephen A; Hazan-Molina, Hagai; Aizenbud, Dror

    2014-04-01

    Dentofacial deformities are traditionally treated by maxillary and mandibular osteotomies conducted separately or simultaneously. Recently, distraction osteogenesis has become an irreplaceable part of the surgical armamentarium, for its ability to induce new bone formation between the surfaces of bone segments that are gradually separated by incremental traction, along with a simultaneous expansion of the surrounding soft-tissue envelope. The aim of this article is to describe a combined surgical technique consisting of simultaneous maxillary Le Fort I advancement and mandibular surgical repositioning by means of bilateral sagittal split osteotomy with a curvilinear distractor based on a preliminary computerized presurgical prediction.

  11. Simulation of groundwater flow to assess future withdrawals associated with Base Realignment and Closure (BRAC) at Fort George G. Meade, Maryland

    Science.gov (United States)

    Raffensperger, Jeff P.; Fleming, Brandon J.; Banks, William S.L.; Horn, Marilee A.; Nardi, Mark R.; Andreasen, David C.

    2010-01-01

    Increased groundwater withdrawals from confined aquifers in the Maryland Coastal Plain to supply anticipated growth at Fort George G. Meade (Fort Meade) and surrounding areas resulting from the Department of Defense Base Realignment and Closure Program may have adverse effects in the outcrop or near-outcrop areas. Specifically, increased pumping from the Potomac Group aquifers (principally the Patuxent aquifer) could potentially reduce base flow in small streams below rates necessary for healthy biological functioning. Additionally, water levels may be lowered near, or possibly below, the top of the aquifer within the confined-unconfined transition zone near the outcrop area. A three-dimensional groundwater flow model was created to incorporate and analyze data on water withdrawals, streamflow, and hydraulic head in the region. The model is based on an earlier model developed to assess the effects of future withdrawals from well fields in Anne Arundel County, Maryland and surrounding areas, and includes some of the same features, including model extent, boundary conditions, and vertical discretization (layering). The resolution (horizontal grid discretization) of the earlier model limited its ability to simulate the effects of withdrawals on the outcrop and near-outcrop areas. The model developed for this study included a block-shaped higher-resolution local grid, referred to as the child model, centered on Fort Meade, which was coupled to the coarser-grid parent model using the shared node Local Grid Refinement capability of MODFLOW-LGR. A more detailed stream network was incorporated into the child model. In addition, for part of the transient simulation period, stress periods were reduced in length from 1 year to 3 months, to allow for simulation of the effects of seasonally varying withdrawals and recharge on the groundwater-flow system and simulated streamflow. This required revision of the database on withdrawals and estimation of seasonal variations in

  12. 78 FR 55731 - Notice of Service Delivery Area Designation for the Wilton Rancheria

    Science.gov (United States)

    2013-09-11

    ... medical priority, and the actual availability and accessibility of alternate resources in accordance with... Springs, WY, Fremont, WY, Reservation, Wyoming. Sublette, WY. Aroostook Band of Micmac Indians of... Reservation, Montana. Richland, MT, Roosevelt, MT, Sheridan, MT, Valley, MT. Bad River Band of the Lake...

  13. 76 FR 57739 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2011-09-16

    ... Severity Wildfire, Happy Camp and Oak Knoll Ranger District, Klamath National Forest, Siskiyou County, CA... Authorize Livestock Grazing, Tongue, Medicine Wheel/Paintrock, and Power River Districts of the Bighorn National Forest, Johnson, Sheridan, Big Horn and Washakie Counties, WY, Review Period Ends: 10/17/2011...

  14. Uranium and thorium loadings determined by chemical and nondestructive methods in HTGR fuel rods for the Fort St. Vrain Early Validation Irradiation Experiment

    International Nuclear Information System (INIS)

    Angelini, P.; Rushton, J.E.

    1979-01-01

    The Fort St. Vrain Early Validation Irradiation Experiment is an irradiation test of reference and of improved High-Temperature Gas-Cooled Reactor fuels in the Fort St. Vrain Reactor. The irradiation test includes fuel rods fabricated at ORNL on an engineering scale fuel rod molding machine. Fuel rods were nondestructively assayed for 235 U content by a technique based on the detection of prompt-fission neutrons induced by thermal-neutron interrogation and were later chemically assayed by using the modified Davies Gray potentiometric titration method. The chemical analysis of the thorium content was determined by a volumetric titration method. The chemical assay method for uranium was evaluated and the results from the as-molded fuel rods agree with those from: (1) large samples of Triso-coated fissile particles, (2) physical mixtures of the three particle types, and (3) standard solutions to within 0.05%. Standard fuel rods were fabricated in order to evaluate and calibrate the nondestructive assay device. The agreement of the results from calibration methods was within 0.6%. The precision of the nondestructive assay device was established as approximately 0.6% by repeated measurements of standard rods. The precision was comparable to that estimated by Poisson statistics. A relative difference of 0.77 to 1.5% was found between the nondestructive and chemical determinations on the reactor grade fuel rods

  15. Survey on the radon gas content and surface gamma radiometry in the cape Fort William area

    International Nuclear Information System (INIS)

    Fajardo, Marco

    1998-01-01

    The Ecuadorian Commission of Atomic Energy, during the last years have carried out investigations on the presence of Radon in the Ecuador with a numberless of purposes: radon in polluted spaces, contamination of radon in mining work, radon applied to detection of uranium and exploration of uranium, getting outputs that in their due moment have been published in several reports through the CEEA. Within the Antarctic Ecuadorian Program, it was expounded carry out investigation, on the presence of the gas radon and superficial gamma radiometry in pint Fort William. This study enlarges to the Bransfield Strait, utilizing portable equipment, and allowed to carry out studies in inhospitable zones, where an infrastructure does not exist in order to could employ more complex equipment. The bank of data gotten on radiometry and emanometry will apply to fields of radioprotection, geophysics and geology

  16. Continental United States Military Housing Inspections Southeast

    Science.gov (United States)

    2015-09-24

    that the HVAC system design used in the noncommissioned officer academy buildings at Fort Gordon was not appropriate or adequate for the climatic... HVAC ) system problems; mold; and moisture were not adequately addressed, resulting in poor indoor air quality and potential exposure of occupants to...Patrick AFB. 3 The number of military personnel occupying unaccompanied housing at NS Mayport fluctuates based on ship arrival and departure

  17. USASOC Injury Prevention/Performance Optimization Musculoskeletal Screening Initiative

    Science.gov (United States)

    2016-10-29

    PERFORMING ORGANIZATION REPORT NUMBER er, 3860 South Water St Pittsburgh PA 15203 USASOC 1105 El Salvador St Building E-3323 Fort Bragg NC 28310 9...society beyond science and technology? • improving public knowledge , attitudes, skills, and abilities; • changing behavior, practices, decision making...unit at Fort Bragg to participate in Phase 3 Aim 1, possibly the Special Warfare Center and School (SWCS) candidates for Special Forces. This proposed

  18. Learning in the Making: A Comparative Case Study of Three Makerspaces

    Science.gov (United States)

    Sheridan, Kimberly M.; Halverson, Erica Rosenfeld; Litts, Breanne K.; Brahms, Lisa; Jacobs-Priebe, Lynette; Owens, Trevor

    2014-01-01

    Through a comparative case study, Sheridan and colleagues explore how makerspaces may function as learning environments. Drawing on field observations, interviews, and analysis of artifacts, videos, and other documents, the authors describe features of three makerspaces and how participants learn and develop through complex design and making…

  19. http://spilplus.journals.ac.za/

    African Journals Online (AJOL)

    Shakespeare (met name soos Malvolio, Benvolio), Congreve (vergelyk die volgende name, almal uit The Way of the World: Sir Willfull, Lady Wishfort, Petulant, Mirabell,. Fainall), Dickens (met sy Scrooge, Oliver Twist, Richard Swiveler), Sheridan (Lady. Sneerwell, Mrs. Candour uit The School for Scandal) en selfs Etienne ...

  20. CrossTalk: The Journal of Defense Software Engineering. Volume 21, Number 7

    Science.gov (United States)

    2008-07-01

    However, when your staff ’s passion goes from Edelweiss [1] to Kewpie Station [2], be sure your protective structures fan, rather than extinguish, the... Kewpie Station.” Everybody Loves You. Velour, 2003. 3. August Rush. Dir. Kirsten Sheridan. Perf. Freddie Highmore, Keri Russell, Jonathan Rhys Meyers

  1. Assessing and Minimizing Adversarial Risk in a Nuclear Material Transportation Network

    Science.gov (United States)

    2013-09-01

    SCHOOL September 2013 Author: Bradford S. Foster Approved by: R. Kevin Wood Thesis Advisor Kyle Y. Lin Second Reader Robert F. Dell Chair, Department of...Goodrich Center SnowmassEVillage Raymer Stratton Bethune Granada Holly SheridanELake SugarECity Manzanola Fowler RockyEFord Redcliff Minturn Avon Gypsum

  2. The Design of an IEP Decision Aid: A Tool for Diverse Parents of Children with Autism

    Science.gov (United States)

    Schuttler, Jessica Oeth

    2012-01-01

    Decision-making is a universal process that occurs constantly in life. Parent participation in educational decision-making is recognized as important by special education law, by special education and school psychology literature (Christenson & Sheridan, 2001; IDEIA, 2004;). Partnership in decision-making is especially important for parents of…

  3. 40 CFR 52.2635 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan... implementation plan (SIP) for Sheridan, Wyoming. In addition to the original August 28 submittal, eight...

  4. Le Fort I distraction using internal devices for maxillary hypoplasia in patients with cleft lip, palate, and alveolus: complications and their prevention and management.

    Science.gov (United States)

    Mitsukawa, Nobuyuki; Satoh, Kaneshige; Morishita, Tadashi

    2010-09-01

    In recent years, advancement has been made in distraction osteogenesis in the facial area. It has been applied actively to treat maxillary hypoplasia in patients with cleft lip, palate, and alveolus. Le Fort I distraction using internal devices does not lead to disability in daily living, including during the retention period, and has low surgical invasiveness, facile management, and superior aesthetics. Thus, there have been occasional reports on this procedure in recent years. Because an internal device is unidirectional, the greatest disadvantage is the inability to adjust the direction of distraction after its placement. However, past reports have emphasized its advantages, and its complications have rarely been discussed. We performed Le Fort I distraction using internal devices on 15 young patients. Our results showed notable complications in a few cases. When serial cephalometric analysis was performed after maxillary distraction, it demonstrated that the maxilla assumes various three-dimensional distraction morphologies. In particular, cases with insufficient bone grafting of alveolar clefts developed collapse mainly in the alveolar cleft region during postoperative distraction. Mobility and deviation of the maxillary bone fragment occurred. We implemented preventative measures against complications such as using modifications to place the devices parallel on the left and right sides and using a bite splint for distraction. These measures produced improved outcomes, and we describe here the details.

  5. Combating Tobacco Use in the United States Army

    Science.gov (United States)

    2010-04-01

    videogame , tobacco use, military. 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT 18. NUMBER OF PAGES 19a. NAME OF RESPONSIBLE... videogame is theory-guided and uses animations, videos and interactive activities to provide facts about smoking and tobacco use, as well as provides...prevention and cessation interactive multimedia tool ( videogame ) among active Army personnel stationed at Fort Hood, Texas. Body Throughout the

  6. Derivation of Nationally Consistent Indices Representing Urban Intensity Within and Across Nine Metropolitan Areas of the Conterminous United States

    Science.gov (United States)

    Cuffney, Thomas F.; Falcone, James A.

    2009-01-01

    Two nationally consistent multimetric indices of urban intensity were developed to support studies of the effects of urbanization on streams in nine metropolitan areas of the conterminous United States: Atlanta, Georgia; Birmingham, Alabama; Boston, Massachusetts; Dallas-Fort Worth, Texas; Denver, Colorado; Milwaukee-Green Bay, Wisconsin; Portland, Oregon; Raleigh, North Carolina; and Salt Lake City, Utah. These studies were conducted as a part of the U.S. Geological Survey's National Water-Quality Assessment Program. These urban intensity indices were used to define gradients of urbanization and to interpret biological, physical, and chemical changes along these gradients. Ninety census, land-cover, and infrastructure variables obtained from nationally available databases were evaluated. Only variables that exhibited a strong and consistent linear relation with 2000 population density were considered for use in the indices. Housing-unit density (HUDEN), percentage of basin area in developed land (P_NLCD1_2), and road density (ROADDEN) were selected as the best representatives of census, land-cover, and infrastructure variables. The metropolitan area national urban intensity index (MA-NUII) was scaled to represent urban intensity within each metropolitan area and ranged from 0 (little or no urban) to 100 (maximum urban) for sites within each metropolitan area. The national urban intensity index (NUII) was scaled to represent urban intensity across all nine metropolitan areas and ranged from 0 to 100 for all sites. The rates at which HUDEN, P_NLCD1_2, and ROADDEN changed with changes in population density varied among metropolitan areas. Therefore, these variables were adjusted to obtain a more uniform rate of response across metropolitan areas in the derivation of the NUII. The NUII indicated that maximum levels of urban intensity occurred in the West and Midwest rather than in the East primarily because small inner-city streams in eastern metropolitan areas are

  7. Ground-penetrating radar and electromagnetic surveys at the Monroe Crossroads battlefield site, Fort Bragg, North Carolina

    Science.gov (United States)

    Kessler, Richard; Strain, R.E.; Marlowe, J. I.; Currin, K.B.

    1996-01-01

    A ground-penetrating radar survey was conducted at the Monroe Crossroads Battlefield site at Fort Bragg, North Carolina, to determine possible locations of subsurface archaeological features. An electromagnetic survey also was conducted at the site to verify and augment the ground-penetrating radar data. The surveys were conducted over a 67,200-square-foot grid with a grid point spacing of 20 feet. During the ground-penetrating radar survey, 87 subsurface anomalies were detected based on visual inspection of the field records. These anomalies were flagged in the field as they appeared on the ground-penetrating radar records and were located by a land survey. The electromagnetic survey produced two significant readings at ground-penetrating radar anomaly locations. The National Park Service excavated 44 of the 87 anomaly locations at the Civil War battlefield site. Four of these excavations produced significant archaeological features, including one at an abandoned well.

  8. Geochemistry of water in the Fort Union formation of the northern Powder River basin, southeastern Montana

    Science.gov (United States)

    Lee, Roger W.

    1981-01-01

    Shallow water in the coal-bearing Paleocene Fort Union Formation of southeastern Montana was investigated to provide a better understanding of its geochemistry. Springs, wells less than 200 feet deep, and wells greater than 200 feet deep were observed to have different water qualities. Overall, the ground water exists as two systems: a mosaic of shallow, chemically dynamic, and localized recharge-discharge cells superimposed on a deeper, chemically static regional system. Water chemistry is highly variable in the shallow system; whereas, waters containing sodium and bicarbonate characterize the deeper system. Within the shallow system, springs and wells less than 200 feet deep show predominantly sodium and sulfate enrichment processes from recharge to discharge. These processes are consistent with the observed aquifer mineralogy and aqueous chemistry. However, intermittent mixing with downward moving recharge waters or upward moving deeper waters, and bacterially catalyzed sulfate reduction, may cause apparent reversals in these processes.

  9. Rivers, Rockets and Readiness: Army Engineers in the Sunbelt

    Science.gov (United States)

    1979-01-01

    at Proctor Lake. 138 Water sports are enjoyed at Benbrook Lake. 139 The powerhouse at Sam Rayburn Dam and Reservoir. 140 Amistad Dam - a...for the Fort Worth District. Th~ Fort Worth District designed the United States portion of the Amistad Dam--a cooperative effort with Mexico on the...Antonio Resident Office.17 Adding to the workload was the Amistad Dam located on the Rio Grande River about twelve miles above Del Rio, Texas. The

  10. Non-invasive Transdermal Two-dimensional Mapping of Cutaneous Oxygenation with Rapid-drying Liquid Bandage

    Science.gov (United States)

    2014-10-01

    azatetrabenzoporphyrins-new red laser diode -compatible indicators for optical oxygen sensing,” ACS Appl. Mater. Interfaces 2(2), 366–374 (2010). 17. C. S...Detachment, U.S. Army Institute of Surgical Research, 3698 Chambers Pass, Suite B, JBSA –Fort Sam Houston, Texas 78234-7767, USA 4Harvard University...NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) United States Army Institute of Surgical Research, JBSA Fort Sam Houston, TX 8

  11. 78 FR 55743 - Notice of Service Delivery Area Designation for the Shinnecock Indian Nation

    Science.gov (United States)

    2013-09-11

    ... the availability of funds, the person's relative medical priority, and the actual availability and..., Reservation, Wyoming. Sublette, WY. Aroostook Band of Micmac Indians of Aroostook, ME.\\3\\ Maine. Assiniboine..., Roosevelt, MT, Sheridan, MT, Valley, MT. Bad River Band of the Lake Superior Ashland, WI, Iron, WI. Tribe of...

  12. Hormonal responses of the fish, Cyprinus carpio, to environmental ...

    African Journals Online (AJOL)

    STORAGESEVER

    2009-09-01

    Sep 1, 2009 ... gasoline, batteries, and paint. Environmental pollutants such as metals pose serious risks to many aquatic organisms by changing genetic, .... ties of cortisol and its role in maintaining ion homeostasis. (Sheridan, 1994). Secretion of the steroid hormone cortisol by the interrenal tissue is a characteristic ...

  13. Current Trends in Organized Hate Groups and Their Impact on the United States Army

    National Research Council Canada - National Science Library

    Reed, George

    1999-01-01

    The hate-motivated murders of Michael James and Jackie Burden in Fayetteville, North Carolina, by three Fort Bragg soldiers resulted in an unprecedented self-examination by direction of the Secretary...

  14. Three-dimensional computed tomographic evaluation of bilateral sagittal split osteotomy lingual fracture line and le fort I pterygomaxillary separation in orthognathic surgery using cadaver heads: ultrasonic osteotome versus conventional saw.

    Science.gov (United States)

    Dammous, Sophie; Dupont, Quentin; Gilles, Roland

    2015-06-01

    The purpose of this study was to observe the quality of the fracture line on the lingual side of the mandible after sagittal split osteotomy and the quality of pterygomaxillary separation after Le Fort I osteotomy using the BoneScalpel ultrasonic osteotome. Bimaxillary procedures, according to the standard protocol, were performed using 10 fresh cadaver heads. The ultrasonic osteotome was used in the study group, and a reciprocating saw was used in the control group. Three-dimensional reconstructions of postoperative computed tomographic scans were obtained. The lingual ramus fracture pattern and the pterygomaxillary separation pattern were observed, classified, and compared. Postoperative dissections of the skulls were performed to assess the integrity of the infra-alveolar nerve and the descending palatine artery. No significant differences were found in the cutting time of bone between the BoneScalpel and the sagittal saw. Of the sagittal split osteotomies in the study group, 90% showed a good pattern (vertical pattern of fracture line extending to the inferior border of the mandible running behind the mandibular canal) compared with 50% of the sagittal split osteotomies in the control group. Ideal separation of the pterygoid plates without fractures was observed in 80% of the Le Fort I osteotomies in the study group compared with 50% of the osteotomies in the control group. High-level fractures occurred in 30% of cases in the control group compared with none in the study group. The integrities of the infra-alveolar nerve and the descending palatine artery were preserved in all cases. Use of the ultrasonic BoneScalpel did not require more time than the conventional method. An improved pattern of lingual fracture lines in mandibular sagittal split osteotomy procedures and the pattern of pterygomaxillary separation in Le Fort I osteotomy procedures were observed. Copyright © 2015 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc

  15. Reactivation of the Shock-Tunnel Facility at Fort Cronkhite. Final report

    International Nuclear Information System (INIS)

    1982-05-01

    This final report describes the results of work undertaken to reactivate the Shock Tunnel Facility at Battery Townsley, Fort Cronkhite, Marin County, California. The facility has been reactivated and can not be utilized for blast testing. The major emphasis will be testing of concepts pertaining to programs of interest to the Federal Emergency Management Agency (FEMA) and in particular to civil defense oriented research. However, a wide variety of testing requirements can be accommodated. For example, past programs at the facility have included: tests of debris from trees subjected to blast for Bell Telephone Laboratories; tests of the response of aluminum hull panels to blast loading and of the response of a model surface effects ship for the Naval Ship Research and Development center, and tests of the response of a radome prototype to blast loading conducted for ANCOM (the radome manufacturer). The Shock Tunnel Facility is located in a former coastal defense 16-inch gun emplacement constructed by the US Army beginning in 1938. It was converted in 1967 to serve as a facility for full-scale testing of the loading and response of structural elements and civil defense equipment. It remained in operation until November 1976 when Battery Townsley was turned over to the National Park Service. Work under the present purchase order consisted of the following major tasks: (I) cleanup and secure the facility, (II) reactivate the shock tunnel, and (III) design permanent facility improvements

  16. High-power diode laser in the circumvestibular incision for Le Fort I osteotomy in orthognathic surgery: a prospective case series study.

    Science.gov (United States)

    Jaeger, Filipe; Chiavaioli, Gustavo Marques; de Toledo, Guilherme Lacerda; Freire-Maia, Belini; Amaral, Marcio Bruno Figueiredo; Mesquita, Ricardo Alves

    2018-01-01

    The incisions during orthognathic surgery are classically performed with conventional scalpel or electrocautery. Considering that the high-power diode laser surgery may provide advantages when compared to conventional incision techniques, the current study aimed to present a prospective case series of patients submitted to circumvestibular incision for Le Fort I osteotomy. Ten patients with dentofacial deformities who underwent to rapid assisted maxillary expansion or bimaxillary orthognathic surgery were enrolled in the study. All incisions were performed by a single surgeon using an 808-nm diode laser, with an optical fiber of 600 μm, at a power of 2.5 W, in a continuous-wave mode. The performance of the incision was evaluated by incision velocity, bleeding, edema, secondary infection, clinical healing, and pain. The velocity of the incision ranged from 0.10 to 0.20 mm/s (mean 0.13 ± 0.03 mm/s). Considering bleeding during the soft tissue incision, all surgeries were classified as absent bleeding. All patients presented a clinical healing of the surgical wound in a period that range from 3 to 5 weeks and experienced swelling during the follow-up period. On average, approximately 50% of the swelling had resolved after the third postoperative week, and 28.8% of swelling remained after 2 months after the surgery. The pain decreased after 2 and 3 days, and 90.0% of the patients reported no pain after 7 postoperative days. High-power diode laser is effective and safety during circumvestibular incisions for Le Fort I osteotomy in orthognathic surgery decreasing bleeding, surgery time, pain, and edema after orthognathic surgery.

  17. 78 FR 55737 - Notice of Service Delivery Area Designation for the Tejon Indian Tribe

    Science.gov (United States)

    2013-09-11

    ... on the availability of funds, the person's relative medical priority, and the actual availability and.... Sublette, WY. Aroostook Band of Micmac Indians of Aroostook, ME.\\3\\ Maine. Assiniboine and Sioux Tribes of..., Sheridan, MT, Valley, MT. Bad River Band of the Lake Superior Ashland, WI, Iron, WI. Tribe of Chippewa...

  18. 78 FR 20887 - Notice of Petitions by Firms for Determination of Eligibility To Apply for Trade Adjustment...

    Science.gov (United States)

    2013-04-08

    ... 5880 Sheridan Blvd., 3/5/2013 The firm designs and Arvada, CO 80003. manufacturers audio- visual..., welding fume removal, restaurant kitchen exhaust removal, and smoke pollen filtration for the residential.../b/a Donna M 688 South Santa Fe 103, Los Angeles, CA the design, production 90021. and sales of women...

  19. An Analysis of the Time Course of Lexical Processing during Reading

    Science.gov (United States)

    Sheridan, Heather; Reichle, Erik D.

    2016-01-01

    Reingold, Reichle, Glaholt, and Sheridan (2012) reported a gaze-contingent eye-movement experiment in which survival-curve analyses were used to examine the effects of word frequency, the availability of parafoveal preview, and initial fixation location on the time course of lexical processing. The key results of these analyses suggest that…

  20. Design and Curriculum Considerations for a Computer Graphics Program in the Arts.

    Science.gov (United States)

    Leeman, Ruedy W.

    This history and state-of-the-art review of computer graphics describes computer graphics programs and proposed programs at Sheridan College (Canada), the Rhode Island School of Design, the University of Oregon, Northern Illinois University, and Ohio State University. These programs are discussed in terms of their philosophy, curriculum, student…

  1. KPI Graduate Executive Summary Report, Summer 2000-Winter 2001.

    Science.gov (United States)

    Sheridan Coll. (Ontario).

    Summarizes findings from the Key Performance Indicator Satisfaction Survey administered by Sheridan College in the summer 2000, fall 2000, and winter 2001 terms. This survey was administered in compliance with the Ontario government's efforts to increase the accountability of the Colleges of Applied Arts and Technology through the measurement of…

  2. Narcotics-Fueled Violence in Mexico: Crisis for the United States?

    Science.gov (United States)

    2011-03-24

    cartels in Mexico which operate on a highly geographic basis. The DTOs responsible for the majority of violence in Mexico are the Tijuana, Gulf, Sinaloa ...infrastructure along the border region to deal with problems such as a mass migration . The Army maintains large facilities at Fort Bliss in El Paso, Texas and

  3. A Comparison Of The Air Force Institute Of Technology And Civilian Institutions Graduate Logistics Curricula

    Science.gov (United States)

    2006-06-01

    United States Army Command and General Staff College Fort Leavenworth, Kansas AY 04-05 44. Spurr, Stephen H., Academic Degree Structures...Innovative Approaches, Principles of Reform In Degree Structures In the United States. New York Mc Graw -Hill Book Company, 1970. 45. Stratton, Felecia

  4. Buffelgrass-Integrated modeling of an invasive plant

    Science.gov (United States)

    Holcombe, Tracy R.

    2011-01-01

    Buffelgrass (Pennisetum ciliare) poses a problem in the deserts of the United States, growing in dense stands and introducing a wildfire risk in an ecosystem not adapted to fire. The Invasive Species Science Branch of the Fort Collins Science Center has worked with many partners to develop a decision support model and a data management system to address the problem. The decision support model evaluates potential strategies for resource use and allocation. The data management system is a portal where users can submit, view, and download buffelgrass data. These tools provide a case study showcasing how the FORT is working to address the urgent issue of invasive species in the United States.

  5. The Dallas-Fort Worth (DFW) Urban Radar Network: Enhancing Resilience in the Presence of Floods, Tornadoes, Hail and High Winds

    Science.gov (United States)

    Chandra*, Chandrasekar V.; the full DFW Team

    2015-04-01

    Currently, the National Weather Service (NWS) Next Generation Weather Radar (NEXRAD) provides observations updated every five-six minutes across the United States. However, at the maximum NEXRAD operating range of 230 km, the 0.5 degree radar beam (lowest tilt) height is about 5.4 km above ground level (AGL) because of the effect of Earth curvature. Consequently, much of the lower atmosphere (1-3 km AGL) cannot be observed by the NEXRAD. To overcome the fundamental coverage limitations of today's weather surveillance radars, and improve the spatial and temporal resolution issues, at urban scale, the National Science Foundation Engineering Research Center (NSF-ERC) for Collaborative Adaptive Sensing of the Atmosphere (CASA) has embarked the development of Dallas-Fort worth (DFW) urban remote sensing network to conduct high-resolution sensing in the lower atmosphere for a metropolitan environment, communicate high resolution observations and nowcasting of severe weather including flash floods, hail storms and high wind events. Being one of the largest inland metropolitan areas in the U.S., the DFW Metroplex is home to over 6.5 million people by 2012 according to the North Central Texas Council of Governments (NCTCOG). It experiences a wide range of natural weather hazards, including urban flash flood, high wind, tornado, and hail, etc. Successful monitoring of the rapid changing meteorological conditions in such a region is necessary for emergency management and decision making. Therefore, it is an ideal location to investigate the impacts of hazardous weather phenomena, to enhance resilience in an urban setting and demonstrate the CASA concept in a densely populated urban environment. The DFW radar network consists of 8 dual-polarization X-band weather radars and standard NEXRAD S-band radar, covering the greater DFW metropolitan region. This paper will present high resolution observation of tornado, urban flood, hail storm and damaging wind event all within the

  6. Thermal protection system for the concrete core support floor at Fort St. Vrain

    International Nuclear Information System (INIS)

    Jones, H.; Hedgecock, P.D.

    1976-01-01

    A unique feature of the Fort St. Vrain HTGR is its steel jacketed concrete core support floor. The construction of this floor generally resembles that of the prestressed concrete reactor vessel, but its location immediately below the core hot gas outlets generates some particularly severe thermal protection requirements. A thermal barrier is used over the entire outer surface of the floor and in the twelve hot gas ducts which convey the primary coolant through the floor to the steam generators. A cooling water system of square tubes welded to the inside of the steel jacket is used to remove that heat which does pass through the thermal barrier and to maintain the concrete at acceptable temperatures. The design approach to the floor itself and to the thermal barriers and cooling system will be described, but the main emphasis of the paper will be on the total experience gained during construction and pre-operational testing. A particular problem experienced during construction was leakage from some cooling tubes, after their embedment in concrete. The solution to that problem was to develop a method for injecting catalyzed epoxy into the leaking tube. This method, which has general usefulness for in-service repairs, will be described. (author)

  7. Shaw's Comedy, Language Arts: 5113.90.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL.

    This guide provides the teacher with strategies to aid students in examining five representative plays by Bernard Shaw and in comparing his comedy with the comic art of Oscar Wilde, Richard Sheridan, Ben Jonson, and William Shakespeare. Performance objectives include isolating elements which pertain to the life and times of Shaw, delineating…

  8. Journal for the Study of Religion: Submissions

    African Journals Online (AJOL)

    Foucault, Michel 1977. Discipline and Punish. Trans. by A. Sheridan. New York: Pantheon. Chapter in an edited book. Smart, N. 1985. “The history of religions and its conversation partners.” In The History of Religions, Retrospect and Prospect, pp. 73-85. Edited by J. M. Kitagawa. New York: Macmillan. Encyclopaedia article

  9. An evaluation of air quality at two sites in the lower townsite of Fort McMurray, October 1, 1991 to June 30, 1992

    International Nuclear Information System (INIS)

    Myrick, R.H.

    1992-01-01

    Air quality data collected at two monitoring locations in Fort McMurray, Alberta, from October 1991 to June 1992 are summarized and evaluated. The data analysis includes a comparison of daily average pollutant concentrations at the two stations, the cumulative frequency distribution of the 1-hour average pollutant concentrations, the frequency of times that air pollution regulations were exceeded, and an analysis of the H 2 S and SO 2 concentrations greater than their respective odor thresholds. It was found that SO 2 and H 2 S showed a greater frequency of high concentrations at the Athabasca River Valley location compared to the downtown location. This is attributed to transportation of those pollutants down the valley during stable meteorological conditions with light northerly winds. H 2 S concentrations greater than the 3.5-ppB odor threshold were also more frequent at the valley location, while SO 2 concentrations were below this threshold during the monitoring period. H 2 S and SO 2 concentrations were found to be much greater during times of odor complaints than average values for the entire monitoring period. The odors which prompt complaints are likely caused by sulfur compounds originating from the oil sands plants to the north of the city. Pollutants such as CO and particulates, produced by urban sources, were generally higher at the downtown monitoring location. It was determined that the valley site was the most suitable location for monitoring air pollutants transported into the lower townsite of Fort McMurray from the oil sands facilities. 11 refs., 11 figs., 8 tabs

  10. Book Review of “Human Behaviour and the Social Environment: Models, Metaphors, and Maps for Applying Theoretical Perspectives to Practice”. 640 pages, Thomson Brooks/Cole, 2007, by James A. Forte

    OpenAIRE

    Moula, Alireza

    2008-01-01

    This voluminous book which draws on almost 1000 references provides an important theoretical base for practice. After an informative introduction about models, maps and metaphors, Forte provides an impressive presentation of several perspectives for use in practice; applied ecological theory, applied system theory, applied biology, applied cognitive science, applied psychodynamic theory, applied behaviourism, applied symbolic interactionism, applied social role theory, applied economic theory...

  11. Fort Calhoun Station, Unit 2. License application, PSAR, general information

    International Nuclear Information System (INIS)

    1975-09-01

    Application for construction and operating licenses for Calhoun-2 Reactor is presented. Financial data concerning the Omaha Public Power District and the Nebraska Public Power District are included. (DCC)

  12. Fort Calhoun Station, Unit 1. Semiannual report, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 1,562,051.4 MWH(e) with the reactor on line 3,858.6 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, primary coolant, chemistry, occupational radiation exposure, release of radioactive materials, and environmental monitoring

  13. Qualidade de caqui 'Rama forte' após armazenamento refrigerado, influenciada pelos tratamentos 1-MCP e/ou CO2

    Directory of Open Access Journals (Sweden)

    João Peterson Pereira Gardin

    2012-12-01

    Full Text Available Avaliaram-se os efeitos dos tratamentos com CO2 e 1-MCP (1-metilciclopropeno sobre a adstringência (índice de tanino, firmeza da polpa e distúrbios da epiderme em caqui 'Rama Forte'. Frutos foram tratados com 1-MCP por 24 h, logo após a colheita e/ou com alto CO2 (70% por 24 ou 48 h, um dia após a colheita ou após o armazenamento refrigerado (AR. Os caquis foram armazenados sob atmosfera modificada a 0 ºC, por 45 dias, e a seguir mantidos a 23 ºC, por 9 dias. Frutos-controle (não tratados com 1-MCP nem com CO2 amoleceram em três dias e perderam aproximadamente 50% da adstringência em 6 dias após o AR. A exposição ao CO2 acelerou a redução da adstringência. Esse efeito do CO2 foi menor em frutos tratados com 1-MCP, especialmente quando o CO2 foi aplicado após o AR, por apenas 24 h. O tratamento com 1-MCP inibiu o amolecimento e a redução da adstringência, especialmente nos frutos não tratados com CO2. O amolecimento de frutos tratados com 1-MCP foi maior quando a exposição ao CO2 ocorreu antes do AR. A combinação dos tratamentos com 1-MCP e alto CO2 reduziu a incidência de podridões e manchas translúcidas, mas não alterou o desenvolvimento de pintas pretas ('estrias'. Os resultados indicam que é possível induzir perda da adstringência sem excessiva perda da firmeza da polpa de caquis 'Rama Forte' após o AR pela associação dos tratamentos com 1-MCP logo após a colheita e alto CO2 após o AR.

  14. Assessment of Energetic Compounds, Semi-volatile Organic Compounds, and Trace Elements in Streambed Sediment and Stream Water from Streams Draining Munitions Firing Points and Impact Areas, Fort Riley, Kansas, 2007-08

    Science.gov (United States)

    Coiner, R.L.; Pope, L.M.; Mehl, H.E.

    2010-01-01

    An assessment of energetic compounds (explosive and propellant residues) and associated semi-volatile organic compounds (SVOCs) and trace elements in streambed sediment and stream water from streams draining munitions firing points and impact areas at Fort Riley, northeast Kansas, was performed during 2007-08 by the U.S. Geological Survey (USGS) in cooperation with the U.S. Army. Streambed sediment from 16 sampling sites and stream-water samples from 5 sites were collected at or near Fort Riley and analyzed for as many as 17 energetic compounds, 65 SVOCs, and 27 trace elements. None of the energetic compounds or SVOCs were detected in streambed sediment collected from sites within the Fort Riley Military Reservation. This may indicate that these compounds either are not transported from dispersal areas or that analytical methods are not sensitive enough to detect the small concentrations that may be transported. Concentrations of munitions-associated trace elements did not exceed sediment-quality guidelines recommended by the U.S. Environmental Protection Agency (USEPA) and are not indicative of contamination of streambed sediment at selected streambed sampling sites, at least in regards to movement from dispersal areas. Analytical results of stream-water samples provided little evidence of contamination by energetic compounds, SVOCs, or associated trace elements. Perchlorate was detected in 19 of 20 stream-water samples at concentrations ranging from an estimated 0.057 to an estimated 0.236 ug/L (micrograms per liter) with a median concentration of an estimated 0.114 ug/L, substantially less than the USEPA Interim Health Advisory criterion (15 ug/L), and is in the range of documented background concentrations. Because of these small concentrations and possible natural sources (precipitation and groundwater), it is likely that the occurrence of perchlorate in stream water is naturally occurring, although a definitive identification of the source of perchlorate in

  15. Guy V. Henry: A Study in Military Leadership

    Science.gov (United States)

    1985-05-13

    briefly commanded a battalion during General David Hunter’s advance on Charleston in April 1863, and in June 1863 he served as acting Chief of Artillery...supplications to allow him to resume command of the 7th Cavalry. 3 3 Crook directed all of his assigned units to assemble at Fort Fetterman . The...Fort Fetterman and * with high spirits headed north.3 4 A few humorous incidents octurred during the march. On June 2 the notorious "Calamity Jane

  16. "Closing the Loop": Overcoming barriers to locally sourcing food in Fort Collins, Colorado

    Science.gov (United States)

    DeMets, C. M.

    2012-12-01

    Environmental sustainability has become a focal point for many communities in recent years, and restaurants are seeking creative ways to become more sustainable. As many chefs realize, sourcing food locally is an important step towards sustainability and towards building a healthy, resilient community. Review of literature on sustainability in restaurants and the local food movement revealed that chefs face many barriers to sourcing their food locally, but that there are also many solutions for overcoming these barriers that chefs are in the early stages of exploring. Therefore, the purpose of this research is to identify barriers to local sourcing and investigate how some restaurants are working to overcome those barriers in the city of Fort Collins, Colorado. To do this, interviews were conducted with four subjects who guide purchasing decisions for restaurants in Fort Collins. Two of these restaurants have created successful solutions and are able to source most of their food locally. The other two are interested in and working towards sourcing locally but have not yet been able to overcome barriers, and therefore only source a few local items. Findings show that there are four barriers and nine solutions commonly identified by each of the subjects. The research found differences between those who source most of their food locally and those who have not made as much progress in local sourcing. Based on these results, two solution flowcharts were created, one for primary barriers and one for secondary barriers, for restaurants to assess where they are in the local food chain and how they can more successfully source food locally. As there are few explicit connections between this research question and climate change, it is important to consider the implicit connections that motivate and justify this research. The question of whether or not greenhouse gas emissions are lower for locally sourced food is a topic of much debate, and while there are major developments

  17. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 2. System performance and supporting studies. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    The preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas, is presented. System performance analysis and evaluation are described. Feedback of completed performance analyses on current system design and operating philosophy is discussed. The basic computer simulation techniques and assumptions are described and the resulting energy displacement analysis is presented. Supporting technical studies are presented. These include health and safety and reliability assessments; solar collector component evaluation; weather analysis; and a review of selected trade studies which address significant design alternatives. Additional supporting studies which are generally specific to the installation site are reported. These include solar availability analysis; energy load measurements; environmental impact assessment; life cycle cost and economic analysis; heat transfer fluid testing; meteorological/solar station planning; and information dissemination. (WHK)

  18. Initial Start-Up and Testing of the Fort St. Vrain HTGR – Lessons Learned which May Be Useful for the HTR-PM

    International Nuclear Information System (INIS)

    Brey, H.L.

    2014-01-01

    Although the activities presented in this paper occurred 40 years ago, there are many observations and lessons associated with Fort St. Vrain (FSV) which may be beneficial in support of the start-up, testing and licensing of the HTR-PM. This report includes a review of the FSV NPP design including an overview of the requirements and testing program utilized to bring the plant from initial start-up to full power. A sampling of the test results as well as a comparison of the plant design characteristics to actual values achieved at 100% power along with selected overall experiences gained through operation of this plant is also included. (author)

  19. Knowledge and understanding of dissolved solids in the Rio Grande–San Acacia, New Mexico, to Fort Quitman, Texas, and plan for future studies and monitoring

    Science.gov (United States)

    Moyer, Douglas; Anderholm, Scott K.; Hogan, James F.; Phillips, Fred M.; Hibbs, Barry J.; Witcher, James C.; Matherne, Anne Marie; Falk, Sarah E.

    2013-01-01

    Availability of water in the Rio Grande Basin has long been a primary concern for water-resource managers. The transport and delivery of water in the basin have been engineered by using reservoirs, irrigation canals and drains, and transmountain-water diversions to meet the agricultural, residential, and industrial demand. In contrast, despite the widespread recognition of critical water-quality problems, there have been minimal management efforts to improve water quality in the Rio Grande. Of greatest concern is salinization (concentration of dissolved solids approaching 1,000 mg/L), a water-quality problem that has been recognized and researched for more than 100 years because of the potential to limit both agricultural and municipal use. To address the issue of salinization, water-resource managers need to have a clear conceptual understanding of the sources of salinity and the factors that control storage and transport, identify critical knowledge gaps in this conceptual understanding, and develop a research plan to address these gaps and develop a salinity management program. In 2009, the U.S. Geological Survey (USGS) in cooperation with the U.S. Army Corps of Engineers (USACE), New Mexico Interstate Stream Commission (NMISC), and New Mexico Environment Department (NMED) initiated a project to summarize the current state of knowledge regarding the transport of dissolved solids in the Rio Grande between San Acacia, New Mexico, and Fort Quitman, Texas. The primary objective is to provide hydrologic information pertaining to the spatial and temporal variability present in the concentrations and loads of dissolved solids in the Rio Grande, the source-specific budget for the mass of dissolved solids transported along the Rio Grande, and the locations at which dissolved solids enter the Rio Grande. Dissolved-solids concentration data provide a good indicator of the general quality of surface water and provide information on the factors governing salinization within

  20. Experimental Fabrication Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Provides aviation fabrication support to special operations aircraft residing at Fort Eustis and other bases in the United States. Support is also provided to AATD...