WorldWideScience

Sample records for unit failures maintenance

  1. Analysis of Millstone Unit 1 system failure and maintenance data

    International Nuclear Information System (INIS)

    Bickel, J.H.; Beveridge, R.L.; Jain, N.K.; Owens, D.B.; Radder, J.A.

    1985-01-01

    As a result of a task force plan developed four years ago at Northeast Utilities, plant-specific probabilistic safety analysis models are being developed for all Northeast Utilities operating nuclear plants. An essential feature of these models is their reliance on plant-specific reliability information to the maximum extent possible. This assures that future design efforts and decisions on backfitting or procedure changes are made with full knowledge of existing plant reliability. The use of plant-specific reliability data assures that the impacts of problem components are given appropriate attention and that proper credit is given for those components, which because of plant-specific maintenance practices, have exhibited better than industry average performance. A case study of a portion of the Millstone-1 cooling system demonstrates differing results obtained by fault tree analysis and a reliability analysis using plant-specific failure data. When risk assessment techniques are being applied in resource allocation, usage of plant data clearly becomes essential for sound decision making

  2. Respiratory failure in tetanic patient: maintenance of airway problem in intensive care unit setting

    Science.gov (United States)

    Utami, I. N.; Arifin; Susilo, R. S. B.; Redhono, D.; Sumandjar, T.

    2018-03-01

    Tetanus is a toxin-mediated disease caused by Clostridium tetani resulting in muscular stiffness and painful spasm. The case fatality rates are high (10-80%), and the most frequent cause of mortality is airway problem that results in respiratory failure. A 52-year-old malecame to the hospital with lockjaw, rhesussardonicus, opisthotonus, and seizure for the last 12 hours, diagnosed with tetanus grade II. We placed the patient in an isolation room, gave 3000U tetanus immunoglobulin, 20mg diazepam in 500ml dextrose 5%/8 hours, and 500mg/6hrs metronidazole. On the seventh day, seizure became frequent, respiratory rate increased with crackles found on the auscultation, and the blood gas analysis showed respiratory failure type II (PCO2 53mmHg). The patientwas immediately sent to the ICU, intubated and given ventilator support. The patientwas sedated with continuous injection of midazolam 3 mg/h, morphine 10mcg/kgBW/h and also levofloxacin 750mg/24hours. Bronchoalveolar lavage culture was positive for Acinetobacter baumanii, so we changed the antibiotic to amikacin injection 500 mg/8hrs. After four days, we extubated the ventilator and transferred from HCU three days later. The patient was fully recovered and discharged after eighteen days of hospitalization.

  3. Routine maintenance prolongs ESP time between failures

    International Nuclear Information System (INIS)

    Hurst, T.; Lannom, R.W.; Divine, D.L.

    1992-01-01

    This paper reports that routine maintenance of electric submersible motors (ESPs) significantly lengthened the mean time between motor failures (MTBF), decreased operating costs, and extended motor run life in the Sacroc Unit of the Kelly-Snyder field in West Texas. After the oil price boom of the early 1980s. rapidly eroding profit margins from producing properties caused a much stronger focus on reducing operating costs. In Sacroc, ESP operating life and repair costs became a major target of cost reduction efforts. The routine ESP maintenance program has been in place for over 3 years

  4. Failure: A Source of Progress in Maintenance and Design

    Science.gov (United States)

    Chaïb, R.; Taleb, M.; Benidir, M.; Verzea, I.; Bellaouar, A.

    This approach, allows using the failure as a source of progress in maintenance and design to detect the most critical components in equipment, to determine the priority order maintenance actions to lead and direct the exploitation procedure towards the most penalizing links in this equipment, even define the necessary changes and recommendations for future improvement. Thus, appreciate the pathological behaviour of the material and increase its availability, even increase its lifespan and improve its future design. In this context and in the light of these points, the failures are important in managing the maintenance function. Indeed, it has become important to understand the phenomena of failure and degradation of equipments in order to establish an appropriate maintenance policy for the rational use of mechanical components and move to the practice of proactive maintenance [1], do maintenance at the design [2].

  5. NASA work unit system file maintenance manual

    Science.gov (United States)

    1972-01-01

    The NASA Work Unit System is a management information system for research tasks (i.e., work units) performed under NASA grants and contracts. It supplies profiles on research efforts and statistics on fund distribution. The file maintenance operator can add, delete and change records at a remote terminal or can submit punched cards to the computer room for batch update. The system is designed for file maintenance by a person with little or no knowledge of data processing techniques.

  6. Application of data mining in a maintenance system for failure prediction

    OpenAIRE

    Bastos, Pedro; Lopes, Isabel; Pires, L.C.M.

    2014-01-01

    In industrial environment, data generated during equipment maintenance and monitoring activities has become increasingly overwhelming. Data mining presents an opportunity to increase significantly the rate at which the volume of data can be turned into useful information. This paper presents an architecture designed to gather data generated in industrial units on their maintenance activities, and to forecast future failures based on data analysis. Rapid Miner is used to apply diff...

  7. A Costing Analysis for Decision Making Grid Model in Failure-Based Maintenance

    Directory of Open Access Journals (Sweden)

    Burhanuddin M. A.

    2011-01-01

    Full Text Available Background. In current economic downturn, industries have to set good control on production cost, to maintain their profit margin. Maintenance department as an imperative unit in industries should attain all maintenance data, process information instantaneously, and subsequently transform it into a useful decision. Then act on the alternative to reduce production cost. Decision Making Grid model is used to identify strategies for maintenance decision. However, the model has limitation as it consider two factors only, that is, downtime and frequency of failures. We consider third factor, cost, in this study for failure-based maintenance. The objective of this paper is to introduce the formulae to estimate maintenance cost. Methods. Fish bone analysis conducted with Ishikawa model and Decision Making Grid methods are used in this study to reveal some underlying risk factors that delay failure-based maintenance. The goal of the study is to estimate the risk factor that is, repair cost to fit in the Decision Making Grid model. Decision Making grid model consider two variables, frequency of failure and downtime in the analysis. This paper introduces third variable, repair cost for Decision Making Grid model. This approaches give better result to categorize the machines, reduce cost, and boost the earning for the manufacturing plant. Results. We collected data from one of the food processing factories in Malaysia. From our empirical result, Machine C, Machine D, Machine F, and Machine I must be in the Decision Making Grid model even though their frequency of failures and downtime are less than Machine B and Machine N, based on the costing analysis. The case study and experimental results show that the cost analysis in Decision Making Grid model gives more promising strategies in failure-based maintenance. Conclusions. The improvement of Decision Making Grid model for decision analysis with costing analysis is our contribution in this paper for

  8. Stress-reducing preventive maintenance model for a unit under stressful environment

    International Nuclear Information System (INIS)

    Park, J.H.; Chang, Woojin; Lie, C.H.

    2012-01-01

    We develop a preventive maintenance (PM) model for a unit operated under stressful environment. The PM model in this paper consists of a failure rate model and two cost models to determine the optimal PM scheduling which minimizes a cost rate. The assumption for the proposed model is that stressful environment accelerates the failure of the unit and periodic maintenances reduce stress from outside. The failure rate model handles the maintenance effect of PM using improvement and stress factors. The cost models are categorized into two failure recognition cases: immediate failure recognition and periodic failure detection. The optimal PM scheduling is obtained by considering the trade-off between the related cost and the lifetime of a unit in our model setting. The practical usage of our proposed model is tested through a numerical example.

  9. Analysis of failure and maintenance experiences of motor operated valves in a Finnish nuclear power plant

    International Nuclear Information System (INIS)

    Simola, K.; Laakso, K.

    1992-01-01

    Operating experiences from 1981 up to 1989 of totally 104 motor operated closing valves (MOV) in different safety systems at TVO I and II nuclear power units were analysed in a systematic way. The qualitative methods used were failure mode and effects analysis (FMEA) and maintenance effects and criticality analysis (MECA). The failure descriptions were obtained from power plant's computerized failure reporting system. The reported 181 failure events were reanalysed and sorted according to specific classifications developed for the MOV function. Filled FMEA and MECA sheets on individual valves were stored in a microcomputer data base for further analyses. Analyses were performed for the failed mechanical and electrical valve parts, ways of detection of failure modes, failure effects, and repair and unavailability times

  10. Optimal maintenance of a multi-unit system under dependencies

    Science.gov (United States)

    Sung, Ho-Joon

    The availability, or reliability, of an engineering component greatly influences the operational cost and safety characteristics of a modern system over its life-cycle. Until recently, the reliance on past empirical data has been the industry-standard practice to develop maintenance policies that provide the minimum level of system reliability. Because such empirically-derived policies are vulnerable to unforeseen or fast-changing external factors, recent advancements in the study of topic on maintenance, which is known as optimal maintenance problem, has gained considerable interest as a legitimate area of research. An extensive body of applicable work is available, ranging from those concerned with identifying maintenance policies aimed at providing required system availability at minimum possible cost, to topics on imperfect maintenance of multi-unit system under dependencies. Nonetheless, these existing mathematical approaches to solve for optimal maintenance policies must be treated with caution when considered for broader applications, as they are accompanied by specialized treatments to ease the mathematical derivation of unknown functions in both objective function and constraint for a given optimal maintenance problem. These unknown functions are defined as reliability measures in this thesis, and theses measures (e.g., expected number of failures, system renewal cycle, expected system up time, etc.) do not often lend themselves to possess closed-form formulas. It is thus quite common to impose simplifying assumptions on input probability distributions of components' lifetime or repair policies. Simplifying the complex structure of a multi-unit system to a k-out-of-n system by neglecting any sources of dependencies is another commonly practiced technique intended to increase the mathematical tractability of a particular model. This dissertation presents a proposal for an alternative methodology to solve optimal maintenance problems by aiming to achieve the

  11. Optimal maintenance policy incorporating system level and unit level for mechanical systems

    Science.gov (United States)

    Duan, Chaoqun; Deng, Chao; Wang, Bingran

    2018-04-01

    The study works on a multi-level maintenance policy combining system level and unit level under soft and hard failure modes. The system experiences system-level preventive maintenance (SLPM) when the conditional reliability of entire system exceeds SLPM threshold, and also undergoes a two-level maintenance for each single unit, which is initiated when a single unit exceeds its preventive maintenance (PM) threshold, and the other is performed simultaneously the moment when any unit is going for maintenance. The units experience both periodic inspections and aperiodic inspections provided by failures of hard-type units. To model the practical situations, two types of economic dependence have been taken into account, which are set-up cost dependence and maintenance expertise dependence due to the same technology and tool/equipment can be utilised. The optimisation problem is formulated and solved in a semi-Markov decision process framework. The objective is to find the optimal system-level threshold and unit-level thresholds by minimising the long-run expected average cost per unit time. A formula for the mean residual life is derived for the proposed multi-level maintenance policy. The method is illustrated by a real case study of feed subsystem from a boring machine, and a comparison with other policies demonstrates the effectiveness of our approach.

  12. A maintenance policy for two-unit parallel systems based on imperfect monitoring information

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Anne [Department Genie des Systems Industiels (GSI), Universite de technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes, Cedex (France)]. E-mail: anne.barros@utt.fr; Berenguer, Christophe [Department Genie des Systems Industiels (GSI), Universite de technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes, Cedex (France); Grall, Antoine [Department Genie des Systems Industiels (GSI), Universite de technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes, Cedex (France)

    2006-02-01

    In this paper a maintenance policy is optimised for a two-unit system with a parallel structure and stochastic dependences. Monitoring problems are taken into account in the optimisation scheme: the failure time of each unit can be not detected with a given probability. Conditions on the system parameters (unit failure rates) and on the non-detection probabilities must be verified to make the optimisation scheme valid. These conditions are clearly identified. Numerical experiments allow to show the relevance of taking into account monitoring problems in the maintenance model.

  13. A maintenance policy for two-unit parallel systems based on imperfect monitoring information

    International Nuclear Information System (INIS)

    Barros, Anne; Berenguer, Christophe; Grall, Antoine

    2006-01-01

    In this paper a maintenance policy is optimised for a two-unit system with a parallel structure and stochastic dependences. Monitoring problems are taken into account in the optimisation scheme: the failure time of each unit can be not detected with a given probability. Conditions on the system parameters (unit failure rates) and on the non-detection probabilities must be verified to make the optimisation scheme valid. These conditions are clearly identified. Numerical experiments allow to show the relevance of taking into account monitoring problems in the maintenance model

  14. An Enhanced Preventive Maintenance Optimization Model Based on a Three-Stage Failure Process

    Directory of Open Access Journals (Sweden)

    Ruifeng Yang

    2015-01-01

    Full Text Available Nuclear power plants are highly complex systems and the issues related to their safety are of primary importance. Probabilistic safety assessment is regarded as the most widespread methodology for studying the safety of nuclear power plants. As maintenance is one of the most important factors for affecting the reliability and safety, an enhanced preventive maintenance optimization model based on a three-stage failure process is proposed. Preventive maintenance is still a dominant maintenance policy due to its easy implementation. In order to correspond to the three-color scheme commonly used in practice, the lifetime of system before failure is divided into three stages, namely, normal, minor defective, and severe defective stages. When the minor defective stage is identified, two measures are considered for comparison: one is that halving the inspection interval only when the minor defective stage is identified at the first time; the other one is that if only identifying the minor defective stage, the subsequent inspection interval is halved. Maintenance is implemented immediately once the severe defective stage is identified. Minimizing the expected cost per unit time is our objective function to optimize the inspection interval. Finally, a numerical example is presented to illustrate the effectiveness of the proposed models.

  15. Balancing preventive and corrective maintenance in Cernavoda Unit 1 NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Marinescu, S.

    2000-01-01

    The paper presents a short reminder of Romania's Cernavoda NPP entering commercial operation and a brief description of the CANDU-6 project on which Unit 1 is based. The short term objectives of the maintenance management, the status of the existing maintenance programmes as well as future predictable maintenance programmes are outlined together with the Government plan to complete the balance of NPP. (author)

  16. Concepts for measuring maintenance performance and methods for analysing competing failure modes

    DEFF Research Database (Denmark)

    Cooke, R.; Paulsen, J.L.

    1997-01-01

    competing failure modes. This article examines ways to assess maintenance performance without introducing statistical assumptions, then introduces a plausible statistical model for describing the interaction of preventive and corrective maintenance, and finally illustrates these with examples from...

  17. Evaluation of the adequacy of maintenance tasks using the failure consequences of railroad vehicles

    International Nuclear Information System (INIS)

    Kim, Jaehoon; Jeong, Hyun- Yong

    2013-01-01

    The purpose of this study is to improve the efficiency, reliability and safety related to railroad maintenance tasks through an evaluation of the consequences of failures. The brake system was selected based on the failure data obtained from railroad vehicles in operation as one of the safety systems in railroad vehicles. The failure causes, failure effects, and the criticality of the failure mode were drawn for 62 failure modes of the braking system through the use of an FMECA for the 30 sub-devices having primary functions. The various maintenance tasks for the braking system were categorized into the 62 failure modes and failure consequences using the FMECA and the logic of maintenance decisions. Braking systems manufactured by the same manufacturer and operated by two different operators were studied in an effort to analyze preventive maintenance and to evaluate the adequacy of preventive maintenance tasks for the 62 failure modes. Based on results of the evaluation of these preventive maintenance tasks, new maintenance tasks were proposed, and concrete cost-cutting effects were determined from the calculation of the maintenance time and expected costs, using a preventive maintenance template developed specifically for railroad vehicles

  18. Periodic imperfect preventive maintenance with two categories of competing failure modes

    Energy Technology Data Exchange (ETDEWEB)

    Zequeira, R.I. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: romulo.zequeira@utt.fr; Berenguer, C. [ISTIT FRE CNRS 2732-Equipe LM2S, Universite de Technologie de Troyes, 12 rue Marie Curie, BP 2060, 10010 Troyes (France)]. E-mail: christophe.berenguer@utt.fr

    2006-04-15

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists.

  19. Periodic imperfect preventive maintenance with two categories of competing failure modes

    International Nuclear Information System (INIS)

    Zequeira, R.I.; Berenguer, C.

    2006-01-01

    A maintenance policy is studied for a system with two types of failure modes: maintainable and non-maintainable. The quality of maintenance actions is modelled by its effect on the system failure rate. Preventive maintenance actions restore the system to a condition between as good as new and as bad as immediately before the maintenance action. The model presented permits to study the equipment condition improvement (improvement factor) as a function of the time of the preventive maintenance action. The determination of the maintenance policy, which minimizes the cost rate for an infinite time span, is examined. Conditions are given under which a unique optimal policy exists

  20. Insuring unit failures in electricity markets

    International Nuclear Information System (INIS)

    Pineda, S.; Conejo, A.J.; Carrion, M.

    2010-01-01

    An electric energy producer participates in futures markets in the hope of hedging the risk of trading in the pool. However, this producer is required to supply the energy associated with all its signed forward contracts even if some of its units are forced out due to unexpected failures. In this case, the producer must purchase some of the energy needed to meet its futures market commitments in the pool, which may result in high losses if the pool prices happen to be higher than the forward contract prices. To mitigate these losses, the producer can take out insurance against the forced outages of its units. Using a stochastic programming model, this paper analyzes the convenience of signing an insurance against unit failure by an electric energy producer and its impact on forward contracting decisions. Results from a realistic case study are provided and analyzed.

  1. Concepts for measuring maintenance performance and methods for analysing competing failure modes

    International Nuclear Information System (INIS)

    Cooke, Roger; Paulsen, Jette

    1997-01-01

    Measurement of maintenance performance is done on the basis of component history data in which service sojourns are distinguished according to whether they terminate in corrective or preventive maintenance. From the viewpoint of data analysis, corrective and preventive maintenance constitute competing failure nudes. This article examines ways to assess maintenance performance without introducing statistical assumptions, then introduces a plausible statistical model for describing the interaction of preventive and corrective maintenance, and finally illustrates these with examples from the Nordic TUD data system

  2. An analysis of human maintenance failures of a nuclear power plant

    International Nuclear Information System (INIS)

    Pyy, P.

    2000-01-01

    In the report, a study of faults caused by maintenance activities is presented. The objective of the study was to draw conclusions on the unplanned effects of maintenance on nuclear power plant safety and system availability. More than 4400 maintenance history reports from the years 1992-1994 of Olkiluoto BWR nuclear power plant (NPP) were analysed together with the maintenance personnel. The human action induced faults were classified, e.g., according to their multiplicity and effects. This paper presents and discusses the results of a statistical analysis of the data. Instrumentation and electrical components appeared to be especially prone to human failures. Many human failures were found in safety related systems. Several failures also remained latent from outages to power operation. However, the safety significance of failures was generally small. Modifications were an important source of multiple human failures. Plant maintenance data is a good source of human reliability data and it should be used more in the future. (orig.)

  3. Masonry. Teacher's Guide. Building Maintenance Units of Instruction.

    Science.gov (United States)

    Barnes, Bill

    This teaching guide on masonry building maintenance, one in a series of six publications designed for building maintenance instructors in Texas, is designed to give students an understanding of masonry construction. Introductory material provides teachers with information on use of the units of instruction and personalization and localization of…

  4. Building Maintenance: Introduction. Units of Instruction. Teacher's Guide. First Edition.

    Science.gov (United States)

    Barnes, Bill

    This volume, the first in a series of publications that will provide entry-level competencies in the area of building maintenance, is designed as an introduction. The seven instructional units cover these areas in the shop program: (1) introduction to building maintenance, (2) leadership development, (3) personal development, (4) job application…

  5. Statistical analysis of human maintenance failures of a nuclear power plant

    International Nuclear Information System (INIS)

    Pyy, P.

    2000-01-01

    In this paper, a statistical study of faults caused by maintenance activities is presented. The objective of the study was to draw conclusions on the unplanned effects of maintenance on nuclear power plant safety and system availability. More than 4400 maintenance history reports from the years 1992-1994 of Olkiluoto BWR nuclear power plant (NPP) were analysed together with the maintenance personnel. The human action induced faults were classified, e.g., according to their multiplicity and effects. This paper presents and discusses the results of a statistical analysis of the data. Instrumentation and electrical components are especially prone to human failures. Many human failures were found in safety related systems. Similarly, several failures remained latent from outages to power operation. The safety significance was generally small. Modifications are an important source of multiple human failures. Plant maintenance data is a good source of human reliability data and it should be used more, in future. (orig.)

  6. The study of Influencing Maintenance Factors on Failures of Two gypsum Kilns by Failure Modes and Effects Analysis (FMEA

    Directory of Open Access Journals (Sweden)

    Iraj Alimohammadi

    2014-06-01

    Full Text Available Developing technology and using equipment in Iranian industries caused that maintenance system would be more important to use. Using proper management techniques not only increase the performance of production system but also reduce the failures and costs. The aim of this study was to determine the quality of maintenance system and the effects of its components on failures of kilns in two gypsum production companies using Failure Modes and Effects Analysis (FMEA. Furthermore the costs of failures were studied. After the study of gypsum production steps in the factories, FMEA was conducted by the determination of analysis insight, information gathering, making list of kilns’ component and filling up the FMEA’s tables. The effects of failures on production, how to fail, failure rate, failure severity, and control measures were studied. The evaluation of maintenance system was studied by a check list including questions related to system components. The costs of failures were determined by refer in accounting notebooks and interview with the head of accounting department. It was found the total qualities of maintenance system in NO.1 was more than NO.2 but because of lower quality of NO.1’s kiln design, number of failures and their costs were more. In addition it was determined that repair costs in NO.2’s kiln were about one third of NO.1’s. The low severity failures caused the most costs in comparison to the moderate and low ones. The technical characteristics of kilns were appeared to be the most important factors in reducing of failures and costs.

  7. Analytical method for optimization of maintenance policy based on available system failure data

    International Nuclear Information System (INIS)

    Coria, V.H.; Maximov, S.; Rivas-Dávalos, F.; Melchor, C.L.; Guardado, J.L.

    2015-01-01

    An analytical optimization method for preventive maintenance (PM) policy with minimal repair at failure, periodic maintenance, and replacement is proposed for systems with historical failure time data influenced by a current PM policy. The method includes a new imperfect PM model based on Weibull distribution and incorporates the current maintenance interval T 0 and the optimal maintenance interval T to be found. The Weibull parameters are analytically estimated using maximum likelihood estimation. Based on this model, the optimal number of PM and the optimal maintenance interval for minimizing the expected cost over an infinite time horizon are also analytically determined. A number of examples are presented involving different failure time data and current maintenance intervals to analyze how the proposed analytical optimization method for periodic PM policy performances in response to changes in the distribution of the failure data and the current maintenance interval. - Highlights: • An analytical optimization method for preventive maintenance (PM) policy is proposed. • A new imperfect PM model is developed. • The Weibull parameters are analytically estimated using maximum likelihood. • The optimal maintenance interval and number of PM are also analytically determined. • The model is validated by several numerical examples

  8. Identification of the human factors contributing to maintenance failures in a petroleum operation.

    Science.gov (United States)

    Antonovsky, Ari; Pollock, Clare; Straker, Leon

    2014-03-01

    This research aimed to identify the most frequently occurring human factors contributing to maintenance-related failures within a petroleum industry organization. Commonality between failures will assist in understanding reliability in maintenance processes, thereby preventing accidents in high-hazard domains. Methods exist for understanding the human factors contributing to accidents. Their application in a maintenance context mainly has been advanced in aviation and nuclear power. Maintenance in the petroleum industry provides a different context for investigating the role that human factors play in influencing outcomes. It is therefore worth investigating the contributing human factors to improve our understanding of both human factors in reliability and the factors specific to this domain. Detailed analyses were conducted of maintenance-related failures (N = 38) in a petroleum company using structured interviews with maintenance technicians. The interview structure was based on the Human Factor Investigation Tool (HFIT), which in turn was based on Rasmussen's model of human malfunction. A mean of 9.5 factors per incident was identified across the cases investigated.The three most frequent human factors contributing to the maintenance failures were found to be assumption (79% of cases), design and maintenance (71%), and communication (66%). HFIT proved to be a useful instrument for identifying the pattern of human factors that recurred most frequently in maintenance-related failures. The high frequency of failures attributed to assumptions and communication demonstrated the importance of problem-solving abilities and organizational communication in a domain where maintenance personnel have a high degree of autonomy and a wide geographical distribution.

  9. Maintenance of electrolytic cells with failure technologic mode

    International Nuclear Information System (INIS)

    Galushkin, N.V.

    1995-01-01

    This chapter of monograph is devoted to failures in regular operation of electrolytic cell and ways of their neutralization. Thus, the main failures in regular operation of electrolytic cell, including hot driving, cold driving of tank, carbides formation were studied. The emergency cases in operation of tanks and ways of their neutralization were described.

  10. Failure mode and effect analysis in asset maintenance : a multiple case study in the process industry

    NARCIS (Netherlands)

    Braaksma, Jan; Klingenberg, W.; Veldman, J.

    2013-01-01

    Failure mode and effect analysis (FMEA) is an important method for designing and prioritising preventive maintenance activities and is often used as the basis for preventive maintenance planning. Although FMEA was studied extensively, most of the published work so far covers FMEA concept design.

  11. Failure mode and effect analysis in asset maintenance: a multiple case study in the process industry

    NARCIS (Netherlands)

    Braaksma, Anne Johannes Jan; Klingenberg, W.; Veldman, Jasper

    2013-01-01

    Failure mode and effect analysis (FMEA) is an important method for designing and prioritising preventive maintenance activities and is often used as the basis for preventive maintenance planning. Although FMEA was studied extensively, most of the published work so far covers FMEA concept design.

  12. Nuclear instrument maintenance and technical training in Nuclear Energy Unit

    International Nuclear Information System (INIS)

    Mohamad Nasir Abdul Wahid

    1987-01-01

    Instrument maintenance service is a necessity in a Nuclear Research Institute, such as the Nuclear Energy Unit (NEU) to ensure the smooth running of our research activities. However, realising that maintenance back-up service for either nuclear or other scientific equipment is a major problem in developing countries such as Malaysia, NEU has set up an Instrumentation and Control Department to assist in rectifying the maintenance problem. Beside supporting in house activities in NEU, the Instrumentation and Control Department (I and C) is also geared into providing services to other organisations in Malaysia. This paper will briefly outline the activities of NEU in nuclear instrument maintenance as well as in technical training. (author)

  13. Incorrect modeling of the failure process of minimally repaired systems under random conditions: The effect on the maintenance costs

    International Nuclear Information System (INIS)

    Pulcini, Gianpaolo

    2015-01-01

    This note investigates the effect of the incorrect modeling of the failure process of minimally repaired systems that operates under random environmental conditions on the costs of a periodic replacement maintenance. The motivation of this paper is given by a recently published paper, where a wrong formulation of the expected cost for unit time under a periodic replacement policy is obtained. This wrong formulation is due to the incorrect assumption that the intensity function of minimally repaired systems that operate under random conditions has the same functional form as the failure rate of the first failure time. This produced an incorrect optimization of the replacement maintenance. Thus, in this note the conceptual differences between the intensity function and the failure rate of the first failure time are first highlighted. Then, the correct expressions of the expected cost and of the optimal replacement period are provided. Finally, a real application is used to measure how severe can be the economical consequences caused by the incorrect modeling of the failure process.

  14. Optimization and maintenance tests considering multiple failure modes, aging and imperfect maintenance

    International Nuclear Information System (INIS)

    Martorell, S.; Marton, I.; Sanchez, A.; Carlos, S.

    2014-01-01

    The paper focuses on the optimization of the test and maintenance intervals under the criteria of unavailability or cost including the effect of the aging of the components and models of imperfect maintenance. The results obtained in the case of application, which focuses on a system of safety of a nuclear power station, show differences, mainly in the outage when you consider the aging. (Author)

  15. Design Failure Affecting Maintenance Management on Public Higher Education Institution in Malaysia

    Directory of Open Access Journals (Sweden)

    Agus Salim Nuzaihan Aras

    2016-01-01

    Full Text Available The issue of government building defect is keeping on reporting in the media and arising since 2007. These issues of building defects, maintenance and management have existing and it is deliberated up to the parliament level. The government keep continue increased the maintenance allowance in National Budgetary in every year. However, the building disasters and failures keep going develop their number of cases in Malaysia. Most of the issues are related with a weak maintenance management and faulty in design. This reflects to a poorly building condition, create discomfort and danger environment to the building users. Besides, it will result to a low quality building condition and reflect to a weak building maintenance management. Building defects arise through inappropriate or poor design, specification, construction and it will give an impact to maintenance management itself [1]. Errors in the design of the building are being debated and becoming a reason of major factor in building defect reproduction [2]. Thus, this issue will discover the major cause in building design failure that develop the building defects and verify the impact of design defects towards building maintenance management. The study involved with the public higher education institution in Malaysia focusing on main campuses and the distribution of questionnaire to the facility and maintenance management department. This research is aimed to produce a better understanding on the impact of building design failure towards the institution facilities’ condition.

  16. A Costing Analysis for Decision Making Grid Model in Failure-Based Maintenance

    OpenAIRE

    M. A., Burhanuddin; Halawani, Sami M.; Ahmad, A. R.

    2011-01-01

    Background. In current economic downturn, industries have to set good control on production cost, to maintain their profit margin. Maintenance department as an imperative unit in industries should attain all maintenance data, process information instantaneously, and subsequently transform it into a useful decision. Then act on the alternative to reduce production cost. Decision Making Grid model is used to identify strategies for maintenance decision. However, the model has limitation as it c...

  17. Generating unit maintenance scheduling under competitive market environments

    International Nuclear Information System (INIS)

    Jin Ho Kim; Jong Bae Park; Jong Keun Park; Yeung Han Chun

    2005-01-01

    A novel approach to a generating unit maintenance scheduling problem in competitive electricity markets is presented in this paper. The objective is to develop a game-theoretic framework for analyzing strategic behaviors of generating companies (Gencos) from the standpoint of the generating unit maintenance scheduling (GMS) game and for obtaining the equilibrium solution for the GMS game. The GMS problem is formulated as a dynamic non-cooperative game with complete information. The players correspond to profit maximizing individual Gencos, and the payoff of each player is defined as the profits from the energy market. The optimal schedule is defined by Nash equilibrium (equilibriums) of the game. Numerical results for two-Genco system are used to demonstrate that the proposed framework can be successfully applied to analyzing the strategic behaviors of each Genco and to obtaining the corresponding Nash equilibrium. The result indicates that generating unit maintenance schedule is one of the major strategic behaviors whereby Genco maximize their profits in a competitive market environment. (author)

  18. Neural Networks in Modelling Maintenance Unit Load Status

    Directory of Open Access Journals (Sweden)

    Anđelko Vojvoda

    2002-03-01

    Full Text Available This paper deals with a way of applying a neural networkfor describing se1vice station load in a maintenance unit. Dataacquired by measuring the workload of single stations in amaintenance unit were used in the process of training the neuralnetwork in order to create a model of the obse1ved system.The model developed in this way enables us to make more accuratepredictions over critical overload. Modelling was realisedby developing and using m-functions of the Matlab software.

  19. A multi-level maintenance policy for a multi-component and multifailure mode system with two independent failure modes

    International Nuclear Information System (INIS)

    Zhu, Wenjin; Fouladirad, Mitra; Bérenguer, Christophe

    2016-01-01

    This paper studies the maintenance modelling of a multi-component system with two independent failure modes with imperfect prediction signal in the context of a system of systems. Each individual system consists of multiple series components and the failure modes of all the components are divided into two classes due to their consequences: hard failure and soft failure, where the former causes system failure while the later results in inferior performance (production reduction) of system. Besides, the system is monitored and can be alerted by imperfect prediction signal before hard failure. Based on an illustration example of offshore wind farm, in this paper three maintenance strategies are considered: periodic routine, reactive and opportunistic maintenance. The periodic routine maintenance is scheduled at fixed period for each individual system in the perspective of system of systems. Between two successive routine maintenances, the reactive maintenance is instructed by the imperfect prediction signal according to two criterion proposed in this study for the system components. Due to the high setup cost and practical restraints of implementing maintenance activities, both routine and reactive maintenance can create the opportunities of maintenance for the other components of an individual system. The life cycle of the system and the cost of the proposed maintenance policies are analytically derived. Restrained by the complexity from both the system failure modelling and maintenance strategies, the performances and application scope of the proposed maintenance model are evaluated by numerical simulations. - Highlights: • We study the life behavior of a complex system with two failure modes. • We consider the imperfect prediction signal of potential failure by monitoring. • We propose an integrated maintenance policy with three levels based on wind turbine. • We derive the mathematical cost formulations for the proposed maintenance policy.

  20. Perancangan Maintenance Management Informastion System untuk Unit Pemadam Kebakaran (Studi Kasus : PERUSAHAAN X

    Directory of Open Access Journals (Sweden)

    Arief Samuel Gunawan

    2017-08-01

    Full Text Available Unit Pemadam Kebakaran Perusahaan X merupakan unit kerja yang bertugas melakukan pencegahan dan penanggulangan kebakaran di Perusahaan X. Unit ini dilengkapi dengan peralatan dan perlengkapan kerja, salah satunya yaitu mobil pemadam kebakaran. Salah satu permasalahan yang dihadapi oleh unit ini adalah mobil pemadam kebakaran sering mengalami kerusakan pada saat digunakan. Hal ini disebabkan karena umur komponen yang akan habis dan belum dilakukan penggantian. Umumnya bagian pemeliharaan belum memiliki dokumentasi umur komponen dari setiap mobil pemadam kebakaran. Sehingga petugas pemadam kebakaran tidak dapat mengantisipasi kerusakan yang akan terjadi saat mobil pemadam kebakaran digunakan. Untuk menanggulangi permasalahan tersebut, dikembangkan Maintenance Management Information System (MMIS yang dapat memberikan informasi perkiraan umur komponen mobil. Metode Reliability Centered Maintenance (RCM digunakan pada MMIS untuk menentukan Mean Time To Failure (MTTF. Metode Total Productive Maintenance (TPM juga digunakan pada MMIS untuk merencanakan jadwal pemeliharaan sehingga dapat meminimalisir kerusakan saat mobil digunakan. Untuk mendukung MMIS, diterapkan menu untuk konfigurasi yaitu, data pegawai, inventaris mobil pemadam kebakaran serta inventori suku cadang dan pengadaan barang yang akan berhubungan dengan biaya pemeliharaan.

  1. Establishment, maintenance and application of failure statistics as a basis for availability optimization

    International Nuclear Information System (INIS)

    Poll, H.

    1989-01-01

    The purpose of failure statistics is to obtain hints on weak points due to operation and design. The present failure statistics of Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is based on reducing availability of power station units. If damage or trouble occurs with a unit, data will be recorded in order to calculate the unavailability and to describe the occurence, the extent, and the removal of damage. Following a survey of the most important data, a short explanation is given on updating of failure statistics and some problems of this job are mentioned. Finally some examples are given, how failure statistics can be used for analyses. (orig.) [de

  2. Atomic Energy Control Board (AECB) staff assessment and views of current maintenance practices of a four unit CANDU plant

    International Nuclear Information System (INIS)

    Malek, I.

    1995-01-01

    This paper discusses the AECB practices in assessing maintenance activities at one four unit CANDU nuclear plant.-it outlines the authority of the AECB in enforcing the licence condition concerned with maintenance, and how this is interpreted by AECB site staff to measure and report maintenance activities. The AECB staff attaches great importance to proper maintenance as it affects safe operation. Programs used by the licensee staff to identify safety important components, or to predict degradations and failures are of particular interest. In our experience, the application of such programs has been generally good. However, their integration into an overall maintenance scheme can be improved, and the possibilities of integration are not well understood. This paper includes examples of such integration to illustrate our views and to highlight the resultant benefits that AECB staff believes are possible. (author)

  3. Dynamic decision-making for reliability and maintenance analysis of manufacturing systems based on failure effects

    Science.gov (United States)

    Zhang, Ding; Zhang, Yingjie

    2017-09-01

    A framework for reliability and maintenance analysis of job shop manufacturing systems is proposed in this paper. An efficient preventive maintenance (PM) policy in terms of failure effects analysis (FEA) is proposed. Subsequently, reliability evaluation and component importance measure based on FEA are performed under the PM policy. A job shop manufacturing system is applied to validate the reliability evaluation and dynamic maintenance policy. Obtained results are compared with existed methods and the effectiveness is validated. Some vague understandings for issues such as network modelling, vulnerabilities identification, the evaluation criteria of repairable systems, as well as PM policy during manufacturing system reliability analysis are elaborated. This framework can help for reliability optimisation and rational maintenance resources allocation of job shop manufacturing systems.

  4. Basic factors to forecast maintenance cost and failure processes for nuclear power plants

    International Nuclear Information System (INIS)

    Popova, Elmira; Yu, Wei; Kee, Ernie; Sun, Alice; Richards, Drew; Grantom, Rick

    2006-01-01

    Two types of maintenance interventions are usually administered at nuclear power plants: planned and corrective. The cost incurred includes the labor (manpower) cost, cost for new parts, or emergency order of expensive items. At the plant management level there is a budgeted amount of money to be spent every year for such operations. It is very important to have a good forecast for this cost since unexpected events can trigger it to a very high level. In this research we present a statistical factor model to forecast the maintenance cost for the incoming month. One of the factors is the expected number of unplanned (due to failure) maintenance interventions. We introduce a Bayesian model for the failure rate of the equipment, which is input to the cost forecasting model. The importance of equipment reliability and prediction in the commercial nuclear power plant is presented along with applicable governmental and industry organization requirements. A detailed statistical analysis is performed on a set of maintenance cost and failure data gathered at the South Texas Project Nuclear Operating Company (STPNOC) in Bay City, Texas, USA

  5. Effects of astrogaloside on the inflammation and immunity of renal failure patients receiving maintenance dialysis.

    Science.gov (United States)

    Sun, Renlian; Ren, Haiwei; Wei, Jianxin

    2018-03-01

    Chronic renal failure is a type of clinical syndrome originating from chronic renal diseases. The aim of the study was to investigate the effect of astrogaloside on the inflammation and immunity of renal failure patients receiving maintenance dialysis. We randomly selected 92 renal failure patients receiving maintenance dialysis who were admitted to hospital for treatment between May, 2015 and April, 2016. Patients were randomly divided into the control (n=46) and observation (n=46) groups. Patients in the control group received the regular dialysis plus the basic treatment in Western medicine, while in the observation group, patients additionally received astrogaloside via intravenous injection as treatment. We compared the clinical efficacy of patients between the two groups, residual renal function (RRF), changes in urine volume, variations in inflammatory indicators [C-reaction protein (CRP), interleukin-6 (IL-6), IL-17, and tumor necrosis factor-α (TNF-α)] before and after treatment, and the levels of the thymus-dependent lymphocyte (T cells) subgroup (CD3 + , CD4 + , CD8 + and CD4 + /CD8 + ) in the immune system of patients after treatment. In the observation group, the total effective rate was significantly higher than that in the control group (Prenal failure patients receiving the maintenance dialysis, ameliorate the inflammatory responses, and enhance the immune function, thereby increasing the disease resistance of patients and improving the clinical symptoms.

  6. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  7. Failure and Maintenance Analysis Using Web-Based Reliability Database System

    International Nuclear Information System (INIS)

    Hwang, Seok Won; Kim, Myoung Su; Seong, Ki Yeoul; Na, Jang Hwan; Jerng, Dong Wook

    2007-01-01

    Korea Hydro and Nuclear Power Company has lunched the development of a database system for PSA and Maintenance Rule implementation. It focuses on the easy processing of raw data into a credible and useful database for the risk-informed environment of nuclear power plant operation and maintenance. Even though KHNP had recently completed the PSA for all domestic NPPs as a requirement of the severe accident mitigation strategy, the component failure data were only gathered as a means of quantification purposes for the relevant project. So, the data were not efficient enough for the Living PSA or other generic purposes. Another reason to build a real time database is for the newly adopted Maintenance Rule, which requests the utility to continuously monitor the plant risk based on its operation and maintenance performance. Furthermore, as one of the pre-condition for the Risk Informed Regulation and Application, the nuclear regulatory agency of Korea requests the development and management of domestic database system. KHNP is stacking up data of operation and maintenance on the Enterprise Resource Planning (ERP) system since its first opening on July, 2003. But, so far a systematic review has not been performed to apply the component failure and maintenance history for PSA and other reliability analysis. The data stored in PUMAS before the ERP system is introduced also need to be converted and managed into the new database structure and methodology. This reliability database system is a web-based interface on a UNIX server with Oracle relational database. It is designed to be applicable for all domestic NPPs with a common database structure and the web interfaces, therefore additional program development would not be necessary for data acquisition and processing in the near future. Categorization standards for systems and components have been implemented to analyze all domestic NPPs. For example, SysCode (for a system code) and CpCode (for a component code) were newly

  8. The data collection system for failure/maintenance at the Tritium Systems Test Assembly

    International Nuclear Information System (INIS)

    Casey, M.A.; Gruetzmacher, K.M.; Bartlit, J.R.; Cadwallader, L.C.

    1988-01-01

    A data collection system for obtaining information which can be used to help determine the reliability and vailability of future fusion power plants has been installed at the Los Alamos National Laboratory's Tritium Systems Test Assembly (TSTA). Failure and maintenance data on components of TSTA's tritium systems have been collected since 1984. The focus of the data collection has been TSTA's Tritium Waste Tratment System (TWT), which has maintained high availability since it became operation in 1982. Data collection is still in progress and a total of 291 failure reports are in the data collection system at this time, 47 of which are from the TWT. 6 refs., 2 figs., 2 tabs

  9. Single-stage Kanban system with deterioration failures and condition-based preventive maintenance

    International Nuclear Information System (INIS)

    Xanthopoulos, A.S.; Koulouriotis, D.E.; Botsaris, P.N.

    2015-01-01

    Despite the fact that the fields of pull type production control policies and condition-based preventive maintenance have much in common contextually, they have evolved independently up to now. In this investigation, an attempt is made to bridge the gap between these two branches of knowledge by introducing the single-stage Kanban system with deterioration failures and condition-based preventive maintenance. The formalism of continuous time Markov chains is used to model the system and expressions for eight performance metrics are derived. Two important, from a managerial perspective, constrained optimization problems for the proposed model are defined where the objective is the simultaneous optimization of the Kanban policy, the preventive maintenance policy and the inspection schedule under conflicting performance criteria. Multiple instances of each optimization problem are solved by means of the augmented Lagrangian genetic algorithm. The results from the optimization trials coupled by the results from extensive numerical examples facilitate the thorough investigation of the system’s behaviour. - Highlights: • Kanban system with deterioration failures and preventive maintenance is introduced. • The system is modeled as a continuous time Markov chain. • Expressions for eight performance metrics are derived. • The behavior of the system is studied through numerical examples. • Optimization results for selected performance metrics are presented

  10. The use of lifetime functions in the optimization of interventions on existing bridges considering maintenance and failure costs

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Seung-Ie [Department of Civil, Enviromental, and Architectural Enginnering, University of Colorado, Campus Box 428, Boulder, CO 80309-0428 (United States)]. E-mail: yangsione@dreamwiz.com; Frangopol, Dan M. [Department of Civil, Enviromental, and Architectural Enginnering, University of Colorado, Campus Box 428, Boulder, CO 80309-0428 (United States)]. E-mail: dan.frangopol@colorado.edu; Kawakami, Yoriko [Hanshin Expressway Public Corporation, Kobe Maintenance Department, 16-1 Shinko-cho Chuo-ku Kobe City, Hyogo, 650-0041 (Japan)]. E-mail: yoriko-kawakami@hepc.go.jp; Neves, Luis C. [Department of Civil, Enviromental, and Architectural Enginnering, University of Colorado, Campus Box 428, Boulder, CO 80309-0428 (United States)]. E-mail: lneves@civil.uminho.pt

    2006-06-15

    In the last decade, it became clear that life-cycle cost analysis of existing civil infrastructure must be used to optimally manage the growing number of aging and deteriorating structures. The uncertainties associated with deteriorating structures require the use of probabilistic methods to properly evaluate their lifetime performance. In this paper, the deterioration and the effect of maintenance actions are analyzed considering the performance of existing structures characterized by lifetime functions. These functions allow, in a simple manner, the consideration of the effect of aging on the decrease of the probability of survival of a structure, as well as the effect of maintenance actions. Models for the effects of proactive and reactive preventive maintenance, and essential maintenance actions are presented. Since the probability of failure is different from zero during the entire service life of a deteriorating structure and depends strongly on the maintenance strategy, the cost of failure is included in this analysis. The failure of one component in a structure does not usually lead to failure of the structure and, as a result, the safety of existing structures must be analyzed using a system reliability framework. The optimization consists of minimizing the sum of the cumulative maintenance and expected failure cost during the prescribed time horizon. Two examples of application of the proposed methodology are presented. In the first example, the sum of the maintenance and failure costs of a bridge in Colorado is minimized considering essential maintenance only and a fixed minimum acceptable probability of failure. In the second example, the expected lifetime cost, including maintenance and expected failure costs, of a multi-girder bridge is minimized considering reactive preventive maintenance actions.

  11. The use of lifetime functions in the optimization of interventions on existing bridges considering maintenance and failure costs

    International Nuclear Information System (INIS)

    Yang, Seung-Ie; Frangopol, Dan M.; Kawakami, Yoriko; Neves, Luis C.

    2006-01-01

    In the last decade, it became clear that life-cycle cost analysis of existing civil infrastructure must be used to optimally manage the growing number of aging and deteriorating structures. The uncertainties associated with deteriorating structures require the use of probabilistic methods to properly evaluate their lifetime performance. In this paper, the deterioration and the effect of maintenance actions are analyzed considering the performance of existing structures characterized by lifetime functions. These functions allow, in a simple manner, the consideration of the effect of aging on the decrease of the probability of survival of a structure, as well as the effect of maintenance actions. Models for the effects of proactive and reactive preventive maintenance, and essential maintenance actions are presented. Since the probability of failure is different from zero during the entire service life of a deteriorating structure and depends strongly on the maintenance strategy, the cost of failure is included in this analysis. The failure of one component in a structure does not usually lead to failure of the structure and, as a result, the safety of existing structures must be analyzed using a system reliability framework. The optimization consists of minimizing the sum of the cumulative maintenance and expected failure cost during the prescribed time horizon. Two examples of application of the proposed methodology are presented. In the first example, the sum of the maintenance and failure costs of a bridge in Colorado is minimized considering essential maintenance only and a fixed minimum acceptable probability of failure. In the second example, the expected lifetime cost, including maintenance and expected failure costs, of a multi-girder bridge is minimized considering reactive preventive maintenance actions

  12. Observation unit management of acute decompensated heart failure.

    Science.gov (United States)

    Schrock, Jon W; Emerman, Charles L

    2009-01-01

    Acute decompensated heart failure (ADHF) is a common illness presenting to the emergency department (ED) that is amenable to observation unit (OU) treatment. As the number of baby boomers continues to grow and the incidence of heart failure increases, the financial implications of ADHF treatment will become more prominent. Obtaining institutional support and developing a good working relationship with cardiology colleagues is vital to creating workable ADHF protocols for whichever type of OU an institution decides to use.

  13. Hardware-oriented reliability centered maintenance for the diesel generators of Wolsong unit 1

    International Nuclear Information System (INIS)

    Bae, Sang Min; Park, Jin Hee; Kim, Tae Woon; Lee, Yoon Kee; Song, Jin Bae

    1997-01-01

    The DGs (Diesel Generators) in NPP (Nuclear Power Plant) has been used for the emergency electric power source to shut down the nuclear reactor safely in case of station blackout. The RCM (Reliability Centered Maintenance) has been applied to DGs for increasing the safety of NPP. The structured defects of DG were not remedied by the improvement of maintenance method. As the first stage of RCM, to find the structured defects, its failure modes were searched and analyzed through the ten year maintenance information. The structured defects such as the air compressor, the lubricating oil pressure, and the insufficient load were the root causes of main failures. The air reservoir reinstallation, the lubricating oil tube modification, the load bank installation, and the qualitative instrumentation were the solutions for the hardware oriented RCM of DGs. There remains the software oriented RCM such as the rejection of useless maintenance, the preventive maintenance, the database of maintenance information, and the predictive maintenance

  14. Remote Maintenance Design Guide for Compact Processing Units

    Energy Technology Data Exchange (ETDEWEB)

    Draper, J.V.

    2000-07-13

    Oak Ridge National Laboratory (ORNL) Robotics and Process Systems (RPSD) personnel have extensive experience working with remotely operated and maintained systems. These systems require expert knowledge in teleoperation, human factors, telerobotics, and other robotic devices so that remote equipment may be manipulated, operated, serviced, surveyed, and moved about in a hazardous environment. The RPSD staff has a wealth of experience in this area, including knowledge in the broad topics of human factors, modular electronics, modular mechanical systems, hardware design, and specialized tooling. Examples of projects that illustrate and highlight RPSD's unique experience in remote systems design and application include the following: (1) design of a remote shear and remote dissolver systems in support of U.S. Department of Energy (DOE) fuel recycling research and nuclear power missions; (2) building remotely operated mobile systems for metrology and characterizing hazardous facilities in support of remote operations within those facilities; (3) construction of modular robotic arms, including the Laboratory Telerobotic Manipulator, which was designed for the National Aeronautics and Space Administration (NASA) and the Advanced ServoManipulator, which was designed for the DOE; (4) design of remotely operated laboratories, including chemical analysis and biochemical processing laboratories; (5) construction of remote systems for environmental clean up and characterization, including underwater, buried waste, underground storage tank (UST) and decontamination and dismantlement (D&D) applications. Remote maintenance has played a significant role in fuel reprocessing because of combined chemical and radiological contamination. Furthermore, remote maintenance is expected to play a strong role in future waste remediation. The compact processing units (CPUs) being designed for use in underground waste storage tank remediation are examples of improvements in systems

  15. Failure analysis for ultrasound machines in a radiology department after implementation of predictive maintenance method

    Directory of Open Access Journals (Sweden)

    Greg Chu

    2018-01-01

    Full Text Available Objective: The objective of the study was to perform quantitative failure and fault analysis to the diagnostic ultrasound (US scanners in a radiology department after the implementation of the predictive maintenance (PdM method; to study the reduction trend of machine failure; to understand machine operating parameters affecting the failure; to further optimize the method to maximize the machine clinically service time. Materials and Methods: The PdM method has been implemented to the 5 US machines since 2013. Log books were used to record machine failures and their root causes together with the time spent on repair, all of which were retrieved, categorized, and analyzed for the period between 2013 and 2016. Results: There were a total of 108 cases of failure occurred in these 5 US machines during the 4-year study period. The average number of failure per month for all these machines was 2.4. Failure analysis showed that there were 33 cases (30.5% due to software, 44 cases (40.7% due to hardware, and 31 cases (28.7% due to US probe. There was a statistically significant negative correlation between the time spent on regular quality assurance (QA by hospital physicists with the time spent on faulty parts replacement over the study period (P = 0.007. However, there was no statistically significant correlation between regular QA time and total yearly breakdown case (P = 0.12, although there has been a decreasing trend observed in the yearly total breakdown. Conclusion: There has been a significant improvement on the machine failure of US machines attributed to the concerted effort of sonographers and physicists in our department to practice the PdM method, in that system component repair time has been reduced, and a decreasing trend in the number of system breakdown has been observed.

  16. Effects of a 14-month low-cost maintenance training program in patients with chronic systolic heart failure

    DEFF Research Database (Denmark)

    Prescott, Eva; Hjardem-Hansen, Rasmus; Ørkild, Bodil

    2009-01-01

    Exercise training is known to be beneficial in chronic heart failure (CHF) patients but there is a lack of studies following patient groups for longer duration with maintenance training programs to defer deconditioning.......Exercise training is known to be beneficial in chronic heart failure (CHF) patients but there is a lack of studies following patient groups for longer duration with maintenance training programs to defer deconditioning....

  17. Failure analysis – basic step of applying Reliability Centered Maintenance in general aviation

    Directory of Open Access Journals (Sweden)

    Martin BUGAJ

    2012-01-01

    Full Text Available Performing a reliability analysis on a product or system can actually include a number of different analyses to determine how reliable the product or system is. A reliability centered maintenance program consists of a set of scheduled tasks generated on the basis of specific reliability characteristics of the equipment they are designed to protect. Complex equipment is composed of a vast number of parts and assemblies. All these items can be expected to fail at one time or another, but some of the failures have more serious consequences than others. Certain kinds of failures have a direct effect on operating safety, and others affect the operational capability of the equipment. The consequences of a particular failure depend on the design of the item and the equipment in which it is installed. Although the environment in which the equipment is operated is sometimes an additional factor, the impact of failures on the equipment, and hence their consequences for the operating organization, are established primarily by the equipment designer. Failure consequences are therefore a primary inherent reliability characteristic.

  18. Optimization of the scheduled maintenance on the power units of the nuclear power plants with WWER

    International Nuclear Information System (INIS)

    Skalozubov, V.I.; Kovrizhkin, Yu.L.; Kolykhanov, V.N.; Kochneva, V.Yu.; Urbanskij, V.V.

    2008-01-01

    The advanced international and domestic experience in the field of the maintenance optimization of the power units of NPPs, as well, as on the base of the planning optimization, the maintenance organization and carrying out, the technical maintenance and repair control system automatization, the testing and monitoring optimization during the service process, the modernization of the technology and technical tools of the maintenance service and control is represented

  19. Optimizing production and imperfect preventive maintenance planning's integration in failure-prone manufacturing systems

    International Nuclear Information System (INIS)

    Aghezzaf, El-Houssaine; Khatab, Abdelhakim; Tam, Phuoc Le

    2016-01-01

    This paper investigates the issue of integrating production and maintenance planning in a failure-prone manufacturing system. It is assumed that the system's operating state is stochastically predictable, in terms of its operating age, and that it can accordingly be preventively maintained during preplanned periods. Preventive maintenance is assumed to be imperfect, that is when performed, it brings the manufacturing system to an operating state that lies between ‘as bad as old’ and ‘as good as new’. Only an overhauling of the system brings it to a ‘as good as new’ operating state again. A practical integrated production and preventive maintenance planning model, that takes into account the system's manufacturing capacity and its operational reliability state, is developed. The model is naturally formulated as a mixed-integer non-linear optimization problem, for which an extended mixed-integer linear reformulation is proposed. This reformulation, while it solves the proposed integrated planning problem to optimality, remains quite demanding in terms of computational time. A fix-and-optimize procedure, that takes advantage of some properties of the original model, is then proposed. The reformulation and the fix-and-optimize procedure are tested on some test instances adapted from those available in the literature. The results show that the proposed fix-and-optimize procedure performs quite well and opens new research direction for future improvements. - Highlights: • Integration of production planning and imperfect preventive maintenance is explored. • Imperfect maintenance is modeled using a fitting age reduction hybrid hazard rate. • A practical approximate optimization model for this integration is proposed. • The resulting naturally MINL optimization model is reformulated and solved as a MILP. • An effective fix-and-optimize procedure is proposed for large instances of this MILP.

  20. An approach to integrating surveillance and maintenance tasks to prevent the dominant failure causes of critical components

    International Nuclear Information System (INIS)

    Martorell, S.; Munoz, A.; Serradell, V.

    1995-01-01

    Surveillance requirements and maintenance activities in a nuclear power plant aim to preserve components' inherent reliability. Up to now, predictive and preventive maintenance mainly concerned plant staff, but the US Nuclear Regulatory Commission Maintenance Rule released in July 1991 will have significant impact on how nuclear power plants perform and document this maintenance. Reliability Centered Maintenance (RCM) is a systematic methodology to establish maintenance tasks for critical components in plant with a high degree of compliance with the goals of the Rule. RCM pursues the identification of applicable and efficient tasks to prevent these components from developing their dominant failure causes, and, in turn, towards achieving proper levels of components availability with low cost. In this paper, we present an approach for identifying the most suitable set of tasks to achieve this goal, which involves the integration of maintenance activities and surveillance requirements for each critical component based on the unavailability and cost associated with each individual task which is performed on it

  1. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XX, CUMMINS DIESEL ENGINE, MAINTENANCE SUMMARY.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO PROVIDE A SUMMARY OF THE REASONS AND PROCEDURES FOR DIESEL ENGINE MAINTENANCE. TOPICS ARE WHAT ENGINE BREAK-IN MEANS, ENGINE BREAK-IN, TORQUING BEARINGS (TEMPLATE METHOD), AND THE NEED FOR MAINTENANCE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM "CUMMINS DIESEL ENGINE…

  2. Electrical. Teacher's Guide. Building Maintenance Units of Instruction.

    Science.gov (United States)

    East Texas State Univ., Commerce. Occupational Curriculum Lab.

    This teaching guide on electrical building maintenance, one in a series of six publications designed for building maintenance instructors in Texas, is designed to give students an understanding of electricity in order to know how to make basic repairs to the electrical systems in a building. Introductory material provides teachers with information…

  3. Perancangan Sistem Pemeliharaan Menggunakan Metode Reliability Centered Maintenance (RCM Pada Pulverizer (Studi Kasus: PLTU Paiton Unit 3

    Directory of Open Access Journals (Sweden)

    RATNA BHAKTI PUSPITA SARI

    2017-03-01

    Full Text Available PLTU Paiton Unit 3 merupakan perusahaan yang bergerak di bidang produksi listrik menggunakan bahan baku batubara yang terletak di Paiton, Probolinggo. Untuk mencapai target, proses produksi dilakukan 24 jam selama 1 tahun tanpa henti. Program pemeliharaan mesin sangat penting untuk kelancaran proses produksi. Dalam rangka mencapai target tersebut dituntut adanya kelancaran batubara dari silo hingga surface burner menggunakan pulverizer. Data dari Departemen Engineering menunjukkan bahwa beberapa subsistem pulverizer sering mengalami kerusakan yang dapat menimbulkan kegagalan pada sistem tersebut. Penelitian tugas akhir ini menggunakan metode Reliability Centered Maintenance (RCM untuk menurunkan tingkat breakdown mesin dan downtime produksi. Data historis kerusakan pulverizer dianalisa. Kemudian kegagalan dari suatu komponen yang dapat menyebabkan kegagalan fungsi dari sistem diidentifikasi menggunakan metode Failure Mode and Effect Analysis (FMEA. Selanjutnya menggunakan RCM Decision Worksheet untuk mengetahui bagian dari sistem yang gagal dan perlu dilakukan tindakan perbaikan dan pencegahan berdasarkan kegagalan yang ada agar kejadian yang sama tidak terulang dan menentukan kegiatan perancang perawatan yang tepat pada setiap komponen Berdasarkan analisis data secara Reliability Centered Maintenance (RCM terdapat 12 failure mode yang terjadi pada pulverizer. 3 failure mode dapat dicegah dengan scheduled restoration task, 8 failure mode dapat dicegah dengan scheduled discard task, dan 1 failure mode dapat dicegah dengan redesign. Analisis kuantitatif menggunakan distribusi kegagalan dengan perangkat lunak Weibull++6 didapatkan MTBF grinding roller 2880,66 jam, MTBF hydraulic pump 5075,06 jam, MTBF gearbox 5381,65 jam dan MTBF coal feeder 525,17 jam.

  4. Procedure to evaluate and control efficiently the operations management of medical equipment in the maintenance unit of a health institution

    Directory of Open Access Journals (Sweden)

    Herrera-Galán Michael

    2018-01-01

    Full Text Available Maintenance management plays a very important role in the success of any company. As a consequence of this, in the year of 2013, a study was carried out in health facilities found in the South Eastern Region of Jamaica with the objective of evaluating the existing Maintenance Management Program for Medical Equipment. Among the results obtained, it showed that there is an inadequacy in the existing program whose principal deficiency is attributed to the operations management. As such, this work proposes a procedure for evaluating and controlling in an efficient manner the operations management within the Biomedical Department which forms part of the South East Regional Health Authority Maintenance Unit (SERHAMU, this latter is found on the premises of the Bustamante Hospital for Children (BHC, Jamaica. The method used to develop the procedure (GOMHO is based fundamentally on the design of: a codification system to identify control registers and to record failures associated with each equipment, a system of placing equipment into categories and further differentiating them based on the potential hazard such pose on the human body in the event of an operational failure. In addition, this procedure gives the SERHAMU at the BHC the opportunity to calculate the amount of human resources needed to carry out efficiently the preventative and corrective maintenance work being demanded on the department. During the implementation phase, the results demonstrated that from the control procedure designed there was an improvement in the planning and carrying out of maintenance work and a better system of monitoring the activities that are executed. Also, it was evidenced that there is a 61.53% of the amount of human resources needed to carry out the maintenance actions.

  5. VALIDATION OF SPRING OPERATED PRESSURE RELIEF VALVE TIME TO FAILURE AND THE IMPORTANCE OF STATISTICALLY SUPPORTED MAINTENANCE INTERVALS

    Energy Technology Data Exchange (ETDEWEB)

    Gross, R; Stephen Harris, S

    2009-02-18

    The Savannah River Site operates a Relief Valve Repair Shop certified by the National Board of Pressure Vessel Inspectors to NB-23, The National Board Inspection Code. Local maintenance forces perform inspection, testing, and repair of approximately 1200 spring-operated relief valves (SORV) each year as the valves are cycled in from the field. The Site now has over 7000 certified test records in the Computerized Maintenance Management System (CMMS); a summary of that data is presented in this paper. In previous papers, several statistical techniques were used to investigate failure on demand and failure rates including a quantal response method for predicting the failure probability as a function of time in service. The non-conservative failure mode for SORV is commonly termed 'stuck shut'; industry defined as the valve opening at greater than or equal to 1.5 times the cold set pressure. Actual time to failure is typically not known, only that failure occurred some time since the last proof test (censored data). This paper attempts to validate the assumptions underlying the statistical lifetime prediction results using Monte Carlo simulation. It employs an aging model for lift pressure as a function of set pressure, valve manufacturer, and a time-related aging effect. This paper attempts to answer two questions: (1) what is the predicted failure rate over the chosen maintenance/ inspection interval; and do we understand aging sufficient enough to estimate risk when basing proof test intervals on proof test results?

  6. AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT II, MECHANICAL TRANSMISSIONS.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF MECHANICAL TRANSMISSIONS USED ON DIESEL POWERED VEHICLES. TOPICS ARE (1) PURPOSE OF TRANSMISSIONS, (2) RATIO DIFFERENCE, (3) CONSTANT MESH TRANSMISSIONS, (4) FOUR-SPEED TRUCK TRANSMISSION POWER FLOW, AND (5) TRANSMISSION TROUBLESHOOTING.…

  7. Systematic analysis and prevention of human originated common cause failures in relation to maintenance activities at Finnish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K. [VTT Industrial Systems, Espoo (Finland)

    2006-12-15

    The focus in human reliability analysis of nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, human maintenance failures and design deficiencies, remained latent in the system, have an impact on the severity of a disturbance, e.g. by disabling safety-related equipment on demand. Especially common cause failures (CCFs) of safety related systems can affect the core damage risk to a significant extent. The topic has been addressed in Finnish studies, where experiences of latent human errors have been searched and analysed systematically from the maintenance history stored in the the power plant information systems of the Loviisa and Olkiluoto NPPs. Both the single and multiple errors (CCFs) were classified in detail and documented as error and event reports. The human CCFs involved human, organisational and technical factors. The review of the analysed single and multiple errors showed that instrumentation and control and electrical equipment are more prone to human error caused failure events than the other maintenance objects. The review of the analysed experience showed that most errors stem from the refuelling and maintenance outage periods. More than half of the multiple errors from the outages remained latent to the power operating periods. The review of the analysed multiple errors showed that difficulties with small plant modifications and planning of maintenance and operability were significant sources of common cause failures. The most dependent human errors originating from small modifications could be reduced by a more tailored planning and coverage of their start-up testing programs. Improvements could also be achieved by identifying better in work planning from the operating experiences those complex or intrusive repair and preventive maintenance work tasks and actions which are prone to errors. Such uncertain cases in important equipment require a more tailored work planning of the installation

  8. Systematic analysis and prevention of human originated common cause failures in relation to maintenance activities at Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Laakso, K.

    2006-12-01

    The focus in human reliability analysis of nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, human maintenance failures and design deficiencies, remained latent in the system, have an impact on the severity of a disturbance, e.g. by disabling safety-related equipment on demand. Especially common cause failures (CCFs) of safety related systems can affect the core damage risk to a significant extent. The topic has been addressed in Finnish studies, where experiences of latent human errors have been searched and analysed systematically from the maintenance history stored in the the power plant information systems of the Loviisa and Olkiluoto NPPs. Both the single and multiple errors (CCFs) were classified in detail and documented as error and event reports. The human CCFs involved human, organisational and technical factors. The review of the analysed single and multiple errors showed that instrumentation and control and electrical equipment are more prone to human error caused failure events than the other maintenance objects. The review of the analysed experience showed that most errors stem from the refuelling and maintenance outage periods. More than half of the multiple errors from the outages remained latent to the power operating periods. The review of the analysed multiple errors showed that difficulties with small plant modifications and planning of maintenance and operability were significant sources of common cause failures. The most dependent human errors originating from small modifications could be reduced by a more tailored planning and coverage of their start-up testing programs. Improvements could also be achieved by identifying better in work planning from the operating experiences those complex or intrusive repair and preventive maintenance work tasks and actions which are prone to errors. Such uncertain cases in important equipment require a more tailored work planning of the installation

  9. Application of tape unit in data acquisition system and its maintenance and trouble shoot

    International Nuclear Information System (INIS)

    Xing Jianping; Qian Xicheng

    1995-01-01

    Application of magnetic tape unit in data acquisition system of DEC computer imported from German and its maintenance as well as trouble shoot is described. The system is used for nuclear data acquisition and processing

  10. Developing maintenance technologies for FBR's heat exchanger units by advanced laser processing

    International Nuclear Information System (INIS)

    Nishimura, Akihiko; Shimada, Yukihiro

    2011-01-01

    Laser processing technologies were developed for the purpose of maintenance of FBR's heat exchanger units. Ultrashort laser processing fabricated fiber Bragg grating sensor for seismic monitoring. Fiber laser welding with a newly developed robot system repair cracks on inner wall of heat exchanger tubes. Safety operation of the heat exchanger units will be improved by the advanced laser processing technologies. These technologies are expected to be applied to the maintenance for the next generation FBRs. (author)

  11. Future plans for performance analysis and maintenance/inspection optimization of shutoff rods based on the case study of Bruce Power Unit-3 Shutoff Rod 5 inspection

    International Nuclear Information System (INIS)

    Nasimi, E.; Gabbar, H.A.

    2011-01-01

    Shutdown System 1 (SDS1) is a preferred method for a quick shutdown of nuclear fission process in CANDU (CANada Deuterium Uranium) reactor units. Failure of a routine SDS1 safety test during Fall 2009 outage resulted in the need to develop and execute a new methodology for Shutoff Rod inspection and re-evaluate the known degradation mechanisms and failure modes. This paper describes the development of this methodology and the obtained results. It also proposes several alternative solutions for the future performance analysis and maintenance/inspection optimization for SDS1 Shutoff Rods based on the Bruce Power Unit-3 Shutoff Rod 5 case study. (author)

  12. Characteristics of organizational culture at the maintenance units of two Nordic nuclear power plants

    International Nuclear Information System (INIS)

    Reiman, Teemu; Oedewald, Pia; Rollenhagen, Carl

    2005-01-01

    This study aims to characterize and assess the organizational cultures of two Nordic nuclear power plant (NPP) maintenance units. The research consisted of NPP maintenance units of Forsmark (Sweden) and Olkiluoto (Finland). The study strives to anticipate the consequences of the current practices, conceptions and assumptions in the given organizations to their ability and willingness to fulfill the organizational core task. The methods utilized in the study were organizational culture and core task questionnaire (CULTURE02) and semi-structured interviews. Similarities and differences in the perceived organizational values, conceptions of one's own work, conceptions of the demands of the maintenance task and organizational practices at the maintenance units were explored. The maintenance units at Olkiluoto and Forsmark had quite different organizational cultures, but they also shared a set of dimensions such as strong personal emphasis placed on safety. The authors propose that different cultural features and organizational practices may be equally effective from the perspective of the core task. The results show that due to the complexity of the maintenance work, the case organizations tend to emphasize some aspects of the maintenance task more than others. The reliability consequences of these cultural solutions to the maintenance task are discussed. The authors propose that the organizational core task, in this case the maintenance task, should be clear for all the workers. The results give implications that this has been a challenge recently as the maintenance work has been changing. The concepts of organizational core task and organizational culture could be useful as management tools to anticipate the consequences of organizational changes

  13. Impact of mechanical- and maintenance-induced failures of main reactor coolant pump seals on plant safety

    International Nuclear Information System (INIS)

    Azarm, M.A.; Boccio, J.L.; Mitra, S.

    1985-12-01

    This document presents an investigation of the safety impact resulting from mechanical- and maintenance-induced reactor coolant pump (RCP) seal failures in nuclear power plants. A data survey of the pump seal failures for existing nuclear power plants in the US from several available sources was performed. The annual frequency of pump seal failures in a nuclear power plant was estimated based on the concept of hazard rate and dependency evaluation. The conditional probability of various sizes of leak rates given seal failures was then evaluated. The safety impact of RCP seal failures, in terms of contribution to plant core-melt frequency, was also evaluated for three nuclear power plants. For leak rates below the normal makeup capacity and the impact of plant safety were discussed qualitatively, whereas for leak rates beyond the normal make up capacity, formal PRA methodologies were applied. 22 refs., 17 figs., 19 tabs

  14. CYP2D6 Genetic Variation and Beta-Blocker Maintenance Dose in Patients with Heart Failure.

    Science.gov (United States)

    Luzum, Jasmine A; Sweet, Kevin M; Binkley, Philip F; Schmidlen, Tara J; Jarvis, Joseph P; Christman, Michael F; Sadee, Wolfgang; Kitzmiller, Joseph P

    2017-08-01

    This study examined whether a CYP2D6 polymorphism (CYP2D6*4) was related to beta-blocker maintenance dose in patients with heart failure. Logistic regression modeling was utilized in a retrospective chart-review analysis of heart-failure patients (60% Male, 90% of European descent) to assess whether CYP2D6*4 (non-functional CYP2D6 allele present in 1 of 5 individuals of European descent) is associated with maintenance dose of carvedilol (n = 65) or metoprolol (n = 33). CYP2D6*4 was associated with lower maintenance dose of metoprolol (OR 0.13 [95% CI 0.02-0.75] p = 0.023), and a trend was observed between CYP2D6*4 and higher maintenance dose of carvedilol (OR 2.94 [95% CI 0.84-10.30] p = 0.093). None of the patients that carried CYP2D6*4 achieved the recommended target dose of metoprolol (200 mg/day). Consistent with the role of CYP2D6 in the metabolism of metoprolol, the tolerated maintenance dose of metoprolol was lower in CYP2D6*4 carriers compared to non-carriers. Consistent with the role of CYP2D6 in activation of carvedilol, tolerated maintenance dose of carvedilol was higher in CYP2D6*4 carriers compared to non-carriers. Further investigation is warranted to ascertain the potential of CYP2D6 as a potential predictive biomarker of beta-blocker maintenance dose in heart failure patients.

  15. AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT I, UNDERSTANDING MECHANICAL CLUTCHES.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    ONE OF A 25-MODULE COURSE DESIGNED TO UPGRADE THE JOB SKILLS AND TECHNICAL KNOWLEDGE OF DIESEL MAINENANCE MECHANICS THIS MATERIAL WAS DEVELOPED BY INDUSTRIAL TRAINING AND SUBJECT-MATTER SPECIALISTS AND TESTED IN INDUSTRIAL TRAINING SITUATIONS. THE PURPOSE OF THIS FIRST UNIT IS TO DEVELOP AN UNDERSTANDING OF COMPONENTS, OPERATION, AND ADJUSTMENTS…

  16. Judeo-Spanish Language Maintenance Efforts in the United States.

    Science.gov (United States)

    Malinowski, Arlene

    The aim of the paper is to ascertain the size and cultural vitality of the Sephardic component of the 50 Sephardic congregations and communities in the United States. Particular attention is focused on the extent to which Judeo-Spanish, the language of the Sephardim, continues to play a role within the group. The history of Sephardic expulsion and…

  17. A STUDY ON INCIDENCE OF ACUTE CARDIOVASCULAR COMPLICATIONS DURING MAINTENANCE HAEMODIALYSIS OF END-STAGE RENAL FAILURE PATIENTS

    Directory of Open Access Journals (Sweden)

    Darimireddi Siva Kumar

    2016-09-01

    Full Text Available BACKGROUND To study the incidence of acute cardiovascular complications during haemodialysis in patients with chronic kidney disease with end-stage renal failure on maintenance haemodialysis. METHODS Patients with chronic kidney disease with end-stage renal failure on maintenance haemodialysis at King George Hospital, Andhra Medical College, Visakhapatnam, India, were studied during the period of June 2015 to August 2016. In our study, all the 100 patients underwent 8510 haemodialysis sessions during 1-year period of study. RESULTS Cardiovascular complications are the most common intradialytic complications occurred during the study. Hypotension is the commonest of all the intradialytic as well as cardiovascular complications with a frequency of 1278, which account for 15.01% of the haemodialysis sessions. This was followed by 879 episodes of hypertension (10.32%, 190 episodes of cardiac arrhythmias (2.23%, which include complex ventricular arrhythmias and supraventricular arrhythmias and 162 episodes of chest pain (1.90%. Of the 100 patients, 37% of patients developed cardiac arrhythmias during haemodialysis. The frequency of arrhythmic episodes was 190 (2.23%. Among these, Supraventricular Arrhythmias (SVA and Complex Ventricular Arrhythmic (CVA episodes account for 159 (83.68% and 31 (16.31%, respectively. CVA and SVA occurred in 29% and 19% of patients in the study group, respectively. Both CVA and SVA occurred in 12% of patients. CONCLUSION Intradialytic hypotension is the most common acute intradialytic complication in patients with chronic kidney disease with endstage renal failure undergoing maintenance haemodialysis. This is followed by intradialytic hypertension. Sudden cardiac arrest is the most common cause of death during haemodialysis in patients with end-stage renal disease on haemodialysis. Mortality is high in patients with end-stage renal failure in maintenance haemodialysis with ischaemic heart disease.

  18. Maintenance and repair tools of the 900 MW PWR units in France

    International Nuclear Information System (INIS)

    Blary, F.; Castaing, C.; Hassig, J.

    1985-01-01

    EDF and FRAMATOME have developed special tools and, repair and maintenance procedures to decrease the unavailability of the PWR units and the dosimetry of the personnel of maintenance. This report presents the solution adopted to face the problem of replacement of the internal upper structure pins of 21 units: 1) study and realisation of important industrial means; 2) development of a strategy: the pin replacement is separated from the guide tube replacement by the creation of a pin replacement shop, and, as often as it is possible, the ''AQUARIUM'' method allows to replace the guide-tubes with the aid of a mobile pool called AQUARIUM outside the critical way of shutdown [fr

  19. Development of inspection and maintenance program for reactor and reactivity control units in HANARO

    International Nuclear Information System (INIS)

    Cho, Yeong-Garp

    1998-01-01

    This paper summarizes the overall program for inspection and maintenance of reactor structure and Reactivity Control Units (RCU) of HANARO during lifetime. The long-term plan for in-service inspection is introduced in the viewpoint of the structural integrity of reactor and RCU, and the operability of RCU mechanism. This program includes the list of components to be inspected, the schedule of inspection and maintenance, and the development of special tools and test rig that are required for the remote inspection and maintenance of reactor and RCU components. Preliminary results of the evaluation on the lifetime of RCU components are summarized based on the operation history since the installation of reactor. A test rig will be designed and constructed for the purposes of verifying the prolonged lifetime of RCU components being used, the performance of special tools, and the rehearsal of maintenance work as well. (author)

  20. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  1. Parental Perceptions toward and Practices of Heritage Language Maintenance: Focusing on the United States and Canada

    Science.gov (United States)

    Liang, Feng

    2018-01-01

    This study reviews 17 studies since the year of 2000 on the perceptions and practices of immigrant parents who reside in the United States or Canada with respect to their children's heritage language maintenance (HLM). The findings suggest that parental perceptions may change due to practical considerations and vary with different degrees of…

  2. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT I, GENERAL INTRODUCTION TO DIESEL ENGINES.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    ONE OF A 30-MODULE COURSE DESIGNED TO UPGRADE THE JOB SKILLS AND TECHNICAL KNOWLEDGE OF DIESEL MAINTENANCE MECHANICS, THIS MATERIAL WAS DEVELOPED BY INDUSTRIAL TRAINING AND SUBJECT-MATTER SPECIALISTS AND TESTED IN INDUSTRIAL TRAINING SITUATIONS. THE PURPOSE OF THIS FIRST UNIT IS TO PROVIDE AN INTRODUCTION TO DIESEL ENGINES BY DEVELOPING AN…

  3. A preventive maintenance model with a two-level inspection policy based on a three-stage failure process

    International Nuclear Information System (INIS)

    Wang, Wenbin; Zhao, Fei; Peng, Rui

    2014-01-01

    Inspection is always an important preventive maintenance (PM) activity and can have different depths and cover all or part of plant systems. This paper introduces a two-level inspection policy model for a single component plant system based on a three-stage failure process. Such a failure process divides the system′s life into three stages: good, minor defective and severe defective stages. The first level of inspection, the minor inspection, can only identify the minor defective stage with a certain probability, but can always reveal the severe defective stage. The major inspection can however identify both defective stages perfectly. Once the system is found to be in the minor defective stage, a shortened inspection interval is adopted. If however the system is found to be in the severe defective stage, we may delay the maintenance action if the time to the next planned PM window is less than a threshold level, but otherwise, replace immediately. This corresponds to the well adopted maintenance policy in practice such as periodic inspections with planned PMs. A numerical example is presented to demonstrate the proposed model by comparing with other models. - Highlights: • The system′s deterioration goes through a three-stage process, namely, normal, minor defective and severe defective. • Two levels of inspections are proposed, e.g., minor and major inspections. • Once the minor defective stage is found, instead of taking a maintenance action, a shortened inspection interval is recommended. • When the severe defective stage is found, we delay the maintenance according to the threshold to the next PM. • The decision variables are the inspection intervals and the threshold to PM

  4. A Biochemical Approach to Understanding the Fanconi Anemia Pathway-Regulated Nucleases in Genome Maintenance for Preventing Bone Marrow Failure and Cancer

    Science.gov (United States)

    2014-04-01

    the Fanconi Anemia Pathway- Regulated Nucleases in Genome Maintenance for Preventing Bone Marrow Failure and Cancer PRINCIPAL INVESTIGATOR...GRANT NUMBER 4. TITLE AND SUBTITLE A Biochemical Approach to Understanding the Fanconi Anemia Pathway-Regulated Nucleases in Genome Maintenance for...Unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT Fanconi anemia is the most prevalent inherited BMF syndromes, caused by mutations in

  5. Equipment for maintenance and repair of 900 MW PWR units in France

    International Nuclear Information System (INIS)

    Blary, F.; Castaing, C.; Haessig, M.

    1984-01-01

    As of March 1984, Electricite de France has been operating twenty-seven 900 MW PWR power units. To cut down unit unavailability and reduce the dosimetric requirements of maintenance staff, a wide range of special devices for inspecting and repairing equipment has been designed; details of 64 operational devices and a further 18 still being developed are given in a maintenance catalogue. This special equipment, together with maintenance and repair procedures, has been devised in collaboration with Framatome, the constructor of the nuclear island. One particular problem resolved was that of replacing the pins of the upper internals (UI) of 21 operational units, preventive measures having been taken at the other units. The strategy adopted consisted, first, in setting up a pin-changing workshop to enable the pins and guide tubes to be replaced separately and, second, in devising and applying wherever possible a method for partially replacing the guide tubes outside the critical path of the outage by means of a mobile pool known as the 'Aquarium'. (author)

  6. Reliability modelling for wear out failure period of a single unit system

    OpenAIRE

    Arekar, Kirti; Ailawadi, Satish; Jain, Rinku

    2012-01-01

    The present paper deals with two time-shifted density models for wear out failure period of a single unit system. The study, considered the time-shifted Gamma and Normal distributions. Wear out failures occur as a result of deterioration processes or mechanical wear and its probability of occurrence increases with time. A failure rate as a function of time deceases in an early failure period and it increases in wear out period. Failure rates for time shifted distributions and expression for m...

  7. Condition based monitoring, diagnosis and maintenance on operating equipments of a hydraulic generator unit

    International Nuclear Information System (INIS)

    Liu, X T; Feng, F Z; Si, A W

    2012-01-01

    According to performance characteristics of operating equipments in a hydraulic generator unit (HGU), the relative techniques on condition monitoring and fault diagnosis (CMFD) are introduced in this paper, especially the key technologies are emphasized, such as equipment monitoring, expert system (ES), intelligent diagnosis and condition based maintenance (CBM). Meanwhile, according to the instructor on CBM proposed by State electric power corporation, based on integrated mode, the main steps on implementation of CBM are discussed in this paper.

  8. A recursive framework for time-dependent characteristics of tested and maintained standby units with arbitrary distributions for failures and repairs

    International Nuclear Information System (INIS)

    Vaurio, Jussi K.

    2015-01-01

    The time-dependent unavailability and the failure and repair intensities of periodically tested aging standby system components are solved with recursive equations under three categories of testing and repair policies. In these policies, tests or repairs or both can be minimal or perfect renewals. Arbitrary distributions are allowed to times to failure as well as to repair and renewal durations. Major preventive maintenance is done periodically or at random times, e.g. when a true demand occurs. In the third option process renewal is done if a true demand occurs or when a certain mission time has expired since the previous maintenance, whichever occurs first. A practical feature is that even if a repair can renew the unit, it does not generally renew the alternating process. The formalism updates and extends earlier results by using a special backward-renewal equation method, by allowing scheduled tests not limited to equal intervals and accepting arbitrary distributions and multiple failure types and causes, including failures caused by tests, human errors and true demands. Explicit solutions are produced to integral equations associated with an age-renewal maintenance policy. - Highlights: • Time-dependent unavailability, failure count and repair count for a standby system. • Free testing schedule and distributions for times to failure, repair and maintenance. • Multiple failure modes; tests or repairs or both can be minimal or perfect renewals. • Process renewals periodically, randomly or based on the process age or an initiator. • Backward renewal equations as explicit solutions to Volterra-type integral equations

  9. Failure investigation of stem of valve disc in reactor recirculation system of TAPS Unit-1

    International Nuclear Information System (INIS)

    Ramadasan, E.; Bahl, J.K.; Sivaramakrishnan, K.S.

    1986-01-01

    Failure analysis was carried out of failed 17-4 PH stainless steel stem of the valve disc in reactor recirculation system of Unit-1 of Tarapur Atomic Power Station. The examination revealed that the stem failed due to fatigue, accelerated by corrosion. Recommendations have been made to avoid such failures. (author)

  10. Evaluation of the european heart failure self-care behaviour scale in a united kingdom population

    NARCIS (Netherlands)

    Shuldham, Caroline; Theaker, Chris; Jaarsma, Tiny; Cowie, Martin R.

    2007-01-01

    Title. Evaluation of the European Heart Failure Self-care Behaviour Scale in a United Kingdom population Aim. This paper is a report of a study to test the internal consistency, reliability and validity of the 12-item European Heart Failure Self-care Behaviour Scale in an English-speaking sample in

  11. Classification and Quality Standards of Heart Failure Units: Scientific Consensus of the Spanish Society of Cardiology.

    Science.gov (United States)

    Anguita Sánchez, Manuel; Lambert Rodríguez, José Luis; Bover Freire, Ramón; Comín Colet, Josep; Crespo Leiro, María G; González Vílchez, Francisco; Manito Lorite, Nicolás; Segovia Cubero, Javier; Ruiz Mateas, Francisco; Elola Somoza, Francisco Javier; Íñiguez Romo, Andrés

    2016-10-01

    The prevalence of heart failure remains high and represents the highest disease burden in Spain. Heart failure units have been developed to systematize the diagnosis, treatment, and clinical follow-up of heart failure patients, provide a structure to coordinate the actions of various entities and personnel involved in patient care, and improve prognosis and quality of life. There is ample evidence on the benefits of heart failure units or programs, which have become widespread in Spain. One of the challenges to the analysis of heart failure units is standardization of their classification, by determining which "programs" can be identified as heart failure "units" and by characterizing their complexity level. The aim of this article was to present the standards developed by the Spanish Society of Cardiology to classify and establish the requirements for heart failure units within the SEC-Excellence project. Copyright © 2016 Sociedad Española de Cardiología. Published by Elsevier España, S.L.U. All rights reserved.

  12. Community-level Language Planning for Chinese Heritage Language Maintenance in the United States

    Directory of Open Access Journals (Sweden)

    An Chung Cheng

    2012-08-01

    Full Text Available This paper investigates the development of Chinese heritage language in the United States from the perspective of language policy and planning. The case study examines the Chinese heritage language maintenance through community-based Chinese schools (CHS, and CHS’s relationships with Chinese American community, as well as governments and non-government organizations in China, Taiwan, and the United States. The paper starts with a theoretical discussion on the definition of language policy and planning, and then describes the history and heritage language education of Chinese Americans in the United States. The paper also presents micro-level planning activities initiated by CHSs in the Chinese American community and non-government organizations. Special focus is placed on the interaction between non-government organizations in the US and governmental bodies in Taiwan and mainland China and in the United States. This paper suggests that micro planning of heritage language maintenance is beneficial when initiated in the community, but it can only be developed and sustained within the wider scope of macro-level planning from governments

  13. Probabilistic analysis of Millstone Unit 3 ultimate containment failure probability given high pressure: Chapter 14

    International Nuclear Information System (INIS)

    Bickel, J.H.

    1983-01-01

    The quantification of the containment event trees in the Millstone Unit 3 Probabilistic Safety Study utilizes a conditional probability of failure given high pressure which is based on a new approach. The generation of this conditional probability was based on a weakest link failure mode model which considered contributions from a number of overlapping failure modes. This overlap effect was due to a number of failure modes whose mean failure pressures were clustered within a 5 psi range and which had uncertainties due to variances in material strengths and analytical uncertainties which were between 9 and 15 psi. Based on a review of possible probability laws to describe the failure probability of individual structural failure modes, it was determined that a Weibull probability law most adequately described the randomness in the physical process of interest. The resultant conditional probability of failure is found to have a median failure pressure of 132.4 psia. The corresponding 5-95 percentile values are 112 psia and 146.7 psia respectively. The skewed nature of the conditional probability of failure vs. pressure results in a lower overall containment failure probability for an appreciable number of the severe accident sequences of interest, but also probabilities which are more rigorously traceable from first principles

  14. Failure analysis of storage tank component in LNG regasification unit using fault tree analysis method (FTA)

    Science.gov (United States)

    Mulyana, Cukup; Muhammad, Fajar; Saad, Aswad H.; Mariah, Riveli, Nowo

    2017-03-01

    Storage tank component is the most critical component in LNG regasification terminal. It has the risk of failure and accident which impacts to human health and environment. Risk assessment is conducted to detect and reduce the risk of failure in storage tank. The aim of this research is determining and calculating the probability of failure in regasification unit of LNG. In this case, the failure is caused by Boiling Liquid Expanding Vapor Explosion (BLEVE) and jet fire in LNG storage tank component. The failure probability can be determined by using Fault Tree Analysis (FTA). Besides that, the impact of heat radiation which is generated is calculated. Fault tree for BLEVE and jet fire on storage tank component has been determined and obtained with the value of failure probability for BLEVE of 5.63 × 10-19 and for jet fire of 9.57 × 10-3. The value of failure probability for jet fire is high enough and need to be reduced by customizing PID scheme of regasification LNG unit in pipeline number 1312 and unit 1. The value of failure probability after customization has been obtained of 4.22 × 10-6.

  15. Early Detection of Plant Equipment Failures: A Case Study in Just-in-Time Maintenance

    International Nuclear Information System (INIS)

    Parlos, Alexander G.; Kim, Kyusung; Bharadwaj, Raj M.

    2001-01-01

    The development and testing of a model-based fault detection system for electric motors is briefly presented. The fault detection system was developed using only motor nameplate information. The fault detection results presented utilize only motor voltage and current sensor information, minimizing the need for expensive or intrusive sensors. Dynamic recurrent neural networks are used to predict the input-output response of a three-phase induction motor while using an estimate of the motor speed signal. Multiresolution (or wavelet) signal-processing techniques are used in combination with more traditional methods to estimate fault features for use in winding insulation and motor mechanical and electromechanical failure detection

  16. Early Detection of Plant Equipment Failures: A Case Study in Just-in-Time Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Parlos, Alexander G.; Kim, Kyusung; Bharadwaj, Raj M.

    2001-06-17

    The development and testing of a model-based fault detection system for electric motors is briefly presented. The fault detection system was developed using only motor nameplate information. The fault detection results presented utilize only motor voltage and current sensor information, minimizing the need for expensive or intrusive sensors. Dynamic recurrent neural networks are used to predict the input-output response of a three-phase induction motor while using an estimate of the motor speed signal. Multiresolution (or wavelet) signal-processing techniques are used in combination with more traditional methods to estimate fault features for use in winding insulation and motor mechanical and electromechanical failure detection.

  17. Bruce NGS A Unit 4 preheater divider plate failure

    International Nuclear Information System (INIS)

    Landridge, M.; McInnes, D.

    1995-01-01

    On May 19, 1995, without any prior operational indications, Bruce A discovered preheater divider plate damage in Unit 4 that had the potential to have a major impact on the continued safe operation of the station. Further investigations indicated that Unit 4 may have been operating with this damage for as long as ten years. In the two months following the discovery, Bruce A has procured and replaced the 4 divider plates, located most of the missing pieces, retrieved pieces from the PHT system, investigated historical operational information, performed detailed analytical investigations, investigated root cause, performed in-situ and mock-up testing, updated operational procedures and installed DP monitoring equipment

  18. Investigation of a Rise in Obstetric Acute Renal Failure in the United States, 1999-2011.

    Science.gov (United States)

    Mehrabadi, Azar; Dahhou, Mourad; Joseph, K S; Kramer, Michael S

    2016-05-01

    To estimate whether the reported increase in obstetric acute renal failure in the United States was attributable to a concurrent rise in postpartum hemorrhage, a change in other risk factors, or changes in the diagnosis of acute renal failure. We conducted a retrospective cohort study to quantify temporal trends in acute renal failure among 10,969,263 hospital deliveries in the United States from 1999 to 2011 using data from the Nationwide Inpatient Sample. Dialysis and maternal death were used as markers of severe acute renal failure. Logistic regression was used to determine whether changes in risk factors explained the temporal rise in acute renal failure. Obstetric acute renal failure rose from 2.4 to 6.3 per 10,000 deliveries between 1999-2001 and 2010-2011, a 10% yearly increase (95% confidence interval [CI] 8-11%) and adjustment for risk factors only partially explained the rise (adjusted yearly increase 6%, 95% CI 5-8%). The overall severity of acute renal failure decreased, although acute renal failure with dialysis rose from 0.27 to 0.36 per 10,000 deliveries (P for trend=.01), and acute renal failure associated with maternal death increased from 0.13 to 0.23 per 10,000 deliveries (P for trend=.01). The temporal increase in acute renal failure with dialysis was abolished by adjustment for chronic kidney disease and chronic hypertension. Changes in diagnosis or ascertainment have led to substantial increases in obstetric acute renal failure, whereas increases in chronic kidney disease and chronic hypertension among pregnant women have resulted in modest but significant increases in acute renal failure with dialysis.

  19. Determinants of Heart Failure Self-Care Maintenance and Management in Patients and Caregivers: A Dyadic Analysis.

    Science.gov (United States)

    Bidwell, Julie T; Vellone, Ercole; Lyons, Karen S; D'Agostino, Fabio; Riegel, Barbara; Juárez-Vela, Raúl; Hiatt, Shirin O; Alvaro, Rosaria; Lee, Christopher S

    2015-10-01

    Disease self-management is a critical component of maintaining clinical stability for patients with chronic illness. This is particularly evident in the context of heart failure (HF), which is the leading cause of hospitalization for older adults. HF self-management, commonly known as HF self-care, is often performed with the support of informal caregivers. However, little is known about how a HF dyad manages the patient's care together. The purpose of this study was to identify determinants of patient and caregiver contributions to HF self-care maintenance (daily adherence and symptom monitoring) and management (appropriate recognition and response to symptoms), utilizing an approach that controls for dyadic interdependence. This was a secondary analysis of cross-sectional data from 364 dyads of Italian HF patients and caregivers. Multilevel modeling was used to identify determinants of HF self-care within patient-caregiver dyads. Patients averaged 76.2 (SD = 10.7) years old, and a slight majority (56.9%) was male, whereas caregivers averaged 57.4 (SD = 14.6) years old, and about half (48.1%) were male. Most caregivers were adult children (48.4%) or spouses (32.7%) of patients. Both patients and caregivers reported low levels of HF maintenance and management behaviors. Significant individual and dyadic determinants of self-care maintenance and self-care management included gender, quality of life, comorbid burden, impaired ADLs, cognition, hospitalizations, HF duration, relationship type, relationship quality, and social support. These comprehensive dyadic models assist in elucidating the complex nature of patient-caregiver relationships and their influence on HF self-care, leading to more effective ways to intervene and optimize outcomes. © 2015 Wiley Periodicals, Inc.

  20. Control of a maintenance system when failure and repair times have phase type distributions

    Science.gov (United States)

    Decassiamenesesrodrigues, Rita

    1990-09-01

    In the model of machine repair discussed there are M + R identical machines, M operating, and R spares. All machines are independent of one another. When an operating machine fails, it is sent to a single server repair station and immediately replaced by a spare machine, if one is available. The server has two available service types to choose from. There are waiting costs, repair costs, lost production costs, and switch-over costs. The following decision problem is treated: to obtain a stationary policy which determines the service type as a function of the state of the system in order to minimize the long-run average cost when failure and repair times have second-order Coxian distribution. This control problem is represented by a semi-Markov decision process. The policy-iteration algorithm and the value-iteration algorithm are used to obtain the optimal policy. Numerical results are given for these two optimization methods.

  1. A condition-based maintenance policy with non-periodic inspections for a two-unit series system

    International Nuclear Information System (INIS)

    Castanier, B.; Grall, A.; Berenguer, C.

    2005-01-01

    This paper considers a condition-based maintenance policy for a two-unit deteriorating system. Each unit is subject to gradual deterioration and is monitored by sequential non-periodic inspections. It can be maintained by good as new preventive or corrective replacements. Every inspection or replacement entails a set-up cost and a component-specific unit cost but if actions on the two components are combined, the set-up cost is charged only once. A parametric maintenance decision framework is proposed to coordinate inspection/replacement of the two components and minimize the long-run maintenance cost of the system. A stochastic model is developed on the basis of the semi-regenerative properties of the maintained system state and the associated cost model is used to assess and optimize the performance of the maintenance model. Numerical experiments emphasize the interest of a control of the operation groupings

  2. Dresden Nuclear Power Station, Units 1, 2, and 3. Semiannual report on operating and maintenance, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 388,882 MWH(e) and was on line 3111.2 hours, Unit 2 generated 1,204,106 MWH(e) and was on line 2013.4 hours, and Unit 3 generated 2,250,810 MWH(e) and was on line 3836 hours. Information is presented concerning operations, shutdowns, maintenance, changes, tests, and experiments for the three units. (U.S.)

  3. ANALISIS TOTAL PRODUCTIVE MAINTENANCE DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN FUZZY FAILURE MODE AND EFFECTS ANALYSIS

    Directory of Open Access Journals (Sweden)

    Supriyadi Supriyadi

    2017-11-01

    Full Text Available Ash Handling System merupakan suatu bagian dari pembangkit listrik tenaga uap dengan bahan bakar batu bara yang berfungsi untuk menyalurkan limbah pembuangan sisa hasil proses pembakaran batu bara pada boiler. Sisa pembakaran terbagi menjadi fly ash dan bottom ash. Untuk sisa pembakaran fly ash akan disalurkan menuju ke Electrostatic Precipitator untuk ditangkap  dengan metode corona dan ditransfer menuju penampungan fly ash dengan cara dimampatkan bersama udara dari kompresor yang melalui pipa-pipa dan tabung transporter. Sedangkan untuk sisa pembakaran bottom ash akan disalurkan dengan alat yang disebut SSC (Submerged Scraper Conveyor. Gangguan pada SSC dapat terjadi mulai dari belt putus, masalah pada penggerak, hingga masalah pada kelistrikan dan instrumennya. Penelitian ini bertujuan untuk mengetahui nilai OEE, mengetahui dampak gangguan belt sobek, mengetahui penyebab terjadinya belt conveyor sobek dan melakukan estimasi hasil perbaikan dari sisi biaya. Penelitian ini menggunakan metode Overall Equipment Effectiveness (OEE dan Fuzzy Failure Mode and Effects Analysis. Hasil penelitian menunjukkan bahwa rata-rata nilai OEE pada tahun 2015 sekitar 52,05%, masih di bawah standar nilai OEE sebesar 85%. Penyebab utamanya adalah adanya gangguan belt sobek karena gesekan belt dengan support return ketika belt conveyor mengalami jogging yang berdampak pada terganggunya penyaluran abu. Modifikasi dapat menghindari kerugian perusahaan sebesar Rp. 582.548.800,00.

  4. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XXX, I--CATERPILLAR DIESEL ENGINE MAINTENANCE SUMMARY, II--REIEWING FACTS ABOUT ALTERNATORS.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO PROVIDE A SUMMARY OF DIESEL ENGINE MAINTENANCE FACTORS AND A REVIEW OF DIESEL ENGINE ALTERNATOR OPERATION. THE SEVEN SECTIONS COVER DIESEL ENGINE TROUBLESHOOTING AND THE OPERATION, TESTING, AND ADJUSTING OF ALTERNATORS. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM…

  5. Assessment of corrosion failure in copper tube of refrigerator unit

    International Nuclear Information System (INIS)

    Mohd Harun; Hafizal Yazid; Zaiton Selamat; Mohd Shariff Sattar; Muhamamd Jalil

    2007-01-01

    The copper tubes of the refrigerator unit have been coated with red and white color paints. According to the date of purchase and complaint recorded, the tube leaked after operation about one year. It was observed that the tubes became black and green in color at U-bend of the tube. No corrosion occurred on the internal surface of the tube. The leaking started at outer surface of the tube. The leaking started at outer surface and propagated to the internal surface of the tubes. The leaking damage was caused by corrosive species either from atmospheric corrosion or the paint contained chloride and sulfur elements. The corrosive species of sulfur and chlorine were a main factor in pitting corrosion. (author)

  6. FAMILY BEHAVIOR IN MAINTENANCE STATUS HB CHRONIC RENAL FAILURE PATIENTS THROUGH FAMILY CENTERED CARE APPROACH OF DIET FE MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Anggia Fajar Hardianti

    2017-04-01

    Full Text Available Introduction: Erythropoietic agent as standard practice for anemia treatment, which has a function to increase the value of hemoglobin (Hb to 12 g/dl in patients with chronic renal failure (CRF, who receiving dialysis treatment. The use of erythropoietin has to keep of the iron/Fe amount in the body. Family who have a duty of care should have knowledge, attitude, and behavior to maintain patient’s Hb by giving support to the patient to obey the Fe diet. The aimed of this study was to investigate the effect of family centered care approach in management Fe diet toward family’s behaviour in maintenance Hb level of CRF patients in hemodialysis ward, Gambiran Hospital, Kediri. Method: This study was used a pre experimental design. Total sample were 10 respondents, who met to inclusion criteria. The independent variables were knowledge, attitude, and psychomotor of family in maintenance of Hb level in CRF’s patients. The dependent variable was Fe diet management with family centered care approach. Data was collected by using a structured questionnaire and home visit observation. Result: Data was analyzed by using Wilcoxon Sign Rank Test with significance level α≤0.05. Results showed that Fe diet management with family centered care approach took effect to family’s knowledge (p=0.011, family’s attitude (p=0.005 and family’s psychomotor (p=0.005 in maintenance Hb level of CRF patients. Discussion: Family’s knowledge, attitude, and psychomotor were effected by experiences during the care of a patient, not affordable to access information and patient’s own decision. The strengths and weaknesses in the family to got a better plan of care can be made by discuss and sharing among researcher, patient and his family. It can be concluded that Fe diet management with family centered care approach took effect to family’s behaviour. Further studies should involve larger respondents and better measurement tools to obtain more accurate results.

  7. Four Generations of Maintenance Resource Management Programs in the United States: An Analysis of the Past, Present, and Future

    Science.gov (United States)

    Taylor, James C.; Patankar, Manoj S.

    2001-01-01

    This paper analyzes four generations of Maintenance Resource Management (MRM) programs implemented by aviation maintenance organizations in the United States. Data collected from over ten years of survey research and field observations are used for this analysis; they are presented in a case-study format. The first three generations of MRM programs were episodic efforts to increase safety through teamwork, focus group discussions, and awareness courses, respectively. Now, the fourth generation programs, characterized by a commitment to long-term communication and behavioral changes in maintenance, are set to build on those earlier generations, toward a culture of mutual trust between mechanics, their managers, and regulators.

  8. Fuel failure at the Laguna Verde unit 1- during Cycle 4

    International Nuclear Information System (INIS)

    Espinosa Vega, Juan Manuel

    1996-01-01

    The present work describes the event occurred at the Laguna Verde nuclear power plants Unit 1 during its fourth cycle ensembles; the first failure, by means of a test of power suppression, and the second one, during the sipping accomplished in the four refuelling of the unit. Also it describes the re-evaluation of the event accomplished by the licenser, the manufacturer and the Mexican agency

  9. Heart failure services in the United Kingdom: rethinking the machine bureaucracy.

    Science.gov (United States)

    Hawkins, Nathaniel M; Wright, David J; Capewell, Simon

    2013-01-20

    Poor outcomes and poor uptake of evidence based therapies persist for patients with heart failure in the United Kingdom. We offer a strategic analysis of services, defining the context, organization and objectives of the service, before focusing on implementation and performance. Critical flaws in past service development and performance are apparent, a consequence of failed performance management, policy and political initiative. The barriers to change and potential solutions are common to many health care systems. Integration, information, financing, incentives, innovation and values: all must be challenged and improved if heart failure services are to succeed. Modern healthcare requires open adaptive systems, continually learning and improving. The system also needs controls. Performance indicators should be simple, clinically relevant, and outcome focused. Heart failure presents one of the greatest opportunities to improve symptoms and survival with existing technology. To do so, heart failure services require radical reorganization. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  10. ACUTE RENAL FAILURE IN THE NEWBORNS HOSPITALIZED AT THE INTENSIVE CARE UNIT, UNIVERSITY CLINICAL CENTRE TUZLA

    Directory of Open Access Journals (Sweden)

    Zulić Evlijana

    2015-03-01

    Full Text Available Introduction: Reasons for acute renal failure in hospitalized infants were sepsis, hypovolemia, asphyxia, respiratory distress syndrome, surgical interventions and congenital heart defects. The aim of this study was to determine the frequency and and main etiologies, and early outcome of neonatal acute renal failure. Materials and Methods: At Intensive Care Unit, Clinical Center Tuzla, from 15. 01. 2013 to 15. 01. 2015 in 21 newborn was diagnosed renal failure, based on the amount of excreted urine and serum creatinine. Results: The prevalence of renal failure was 6.84%, with a higher incidence of female. 33.3% of infants were term neonates. Oliguria was diagnosed in 71.4% of newborns. Sepsis was the most common predisposing factor for the development of renal failure, associated with high mortality. Other causes of renal failure were perinatal hypoxia, RDS, surgical interventions and congenital heart defects. There was a positive correlation between the gestational age of the newborn and serum creatinine. Discussion: Early prevention of risk factors with rapid diagnosis and effective treatment, can affect further outcome of acute renal failure in infants.

  11. Developing a Model for Identifying Students at Risk of Failure in a First Year Accounting Unit

    Science.gov (United States)

    Smith, Malcolm; Therry, Len; Whale, Jacqui

    2012-01-01

    This paper reports on the process involved in attempting to build a predictive model capable of identifying students at risk of failure in a first year accounting unit in an Australian university. Identifying attributes that contribute to students being at risk can lead to the development of appropriate intervention strategies and support…

  12. A Study of the Unsafe Actions of Staff in the Maintenance and Overhaul Unit at a Petrochemical Complex and the Presentation of Control Strategies

    Directory of Open Access Journals (Sweden)

    Mousavipour

    2016-02-01

    Full Text Available Background Today, oil, gas, and petrochemical industries are of strategic significance in the macro-development of oil-rich countries. These industries, given the nature of the work and the technical complexity of the various processes, are hazardous and susceptible to occupational accidents. More than 90% of the accidents are related to the faults and unsafe actions of personnel, either directly or indirectly. Objectives The aim of this study is to investigate the unsafe actions of staff working in the maintenance unit of a petrochemical complex. Materials and Methods This is a descriptive and analytical study conducted on 167 morning-shift workers at the Mahshahr petrochemical complex. The data were collected based on a checklist of unsafe actions prepared through a direct observation of their activities and an analysis of work instructions, documents, and incident reports. SPSS statistical software was also used for data analysis and relevant testing. Results According to the results of this study, the mean number of unsafe actions performed by the employees was 42%. The highest number of unsafe actions achieved in the maintenance mechanical unit was 52.8%, 47.1% in repair services, and 43.8% in machinery. The highest frequency of unsafe actions were caused by indiscretion and negligence, a failure to use a face shield and goggles, and non-compliance with safety principles. Conclusions According to the findings, there has been a rise in the number of unsafe actions in machinery and maintenance service units compared to other maintenance units. As such, training courses based on the behavior-based safety principles at the beginning of employment, close monitoring of health safety environment (HSE officials on the implementation of regulations, and provision of appropriate scheduling based on weather conditions and the nature of maintenance services are recommended. In addition, a refrainment from hastiness in performing duties, enhanced

  13. Clustering condition-based maintenance for a multi-unit system with aperiodic inspections

    NARCIS (Netherlands)

    Olde Keizer, Minou C.A.; Teunter, Ruud H.; Podofillini, Luca; Sudret, Bruno; Stojadinović, Božidar; Zio, Enrico; Kröger, Wolfgang

    2015-01-01

    Condition-Based Maintenance (CBM) is a predictive maintenance strategy, which bases the maintenance scheduling on condition measurements of the components. In this paper, we continue work on the CBM optimization approach proposed by Castanier, B., A. Grall & C. Bérenguer (2005). A condition-based

  14. A practical procedure for the selection of time-to-failure models based on the assessment of trends in maintenance data

    International Nuclear Information System (INIS)

    Louit, D.M.; Pascual, R.; Jardine, A.K.S.

    2009-01-01

    Many times, reliability studies rely on false premises such as independent and identically distributed time between failures assumption (renewal process). This can lead to erroneous model selection for the time to failure of a particular component or system, which can in turn lead to wrong conclusions and decisions. A strong statistical focus, a lack of a systematic approach and sometimes inadequate theoretical background seem to have made it difficult for maintenance analysts to adopt the necessary stage of data testing before the selection of a suitable model. In this paper, a framework for model selection to represent the failure process for a component or system is presented, based on a review of available trend tests. The paper focuses only on single-time-variable models and is primarily directed to analysts responsible for reliability analyses in an industrial maintenance environment. The model selection framework is directed towards the discrimination between the use of statistical distributions to represent the time to failure ('renewal approach'); and the use of stochastic point processes ('repairable systems approach'), when there may be the presence of system ageing or reliability growth. An illustrative example based on failure data from a fleet of backhoes is included.

  15. A practical procedure for the selection of time-to-failure models based on the assessment of trends in maintenance data

    Energy Technology Data Exchange (ETDEWEB)

    Louit, D.M. [Komatsu Chile, Av. Americo Vespucio 0631, Quilicura, Santiago (Chile)], E-mail: rpascual@ing.puc.cl; Pascual, R. [Centro de Mineria, Pontificia Universidad Catolica de Chile, Av. Vicuna Mackenna 4860, Santiago (Chile); Jardine, A.K.S. [Department of Mechanical and Industrial Engineering, University of Toronto, 5 King' s College Road, Toronto, Ont., M5S 3G8 (Canada)

    2009-10-15

    Many times, reliability studies rely on false premises such as independent and identically distributed time between failures assumption (renewal process). This can lead to erroneous model selection for the time to failure of a particular component or system, which can in turn lead to wrong conclusions and decisions. A strong statistical focus, a lack of a systematic approach and sometimes inadequate theoretical background seem to have made it difficult for maintenance analysts to adopt the necessary stage of data testing before the selection of a suitable model. In this paper, a framework for model selection to represent the failure process for a component or system is presented, based on a review of available trend tests. The paper focuses only on single-time-variable models and is primarily directed to analysts responsible for reliability analyses in an industrial maintenance environment. The model selection framework is directed towards the discrimination between the use of statistical distributions to represent the time to failure ('renewal approach'); and the use of stochastic point processes ('repairable systems approach'), when there may be the presence of system ageing or reliability growth. An illustrative example based on failure data from a fleet of backhoes is included.

  16. Failure mode and effect analysis: improving intensive care unit risk management processes.

    Science.gov (United States)

    Askari, Roohollah; Shafii, Milad; Rafiei, Sima; Abolhassani, Mohammad Sadegh; Salarikhah, Elaheh

    2017-04-18

    Purpose Failure modes and effects analysis (FMEA) is a practical tool to evaluate risks, discover failures in a proactive manner and propose corrective actions to reduce or eliminate potential risks. The purpose of this paper is to apply FMEA technique to examine the hazards associated with the process of service delivery in intensive care unit (ICU) of a tertiary hospital in Yazd, Iran. Design/methodology/approach This was a before-after study conducted between March 2013 and December 2014. By forming a FMEA team, all potential hazards associated with ICU services - their frequency and severity - were identified. Then risk priority number was calculated for each activity as an indicator representing high priority areas that need special attention and resource allocation. Findings Eight failure modes with highest priority scores including endotracheal tube defect, wrong placement of endotracheal tube, EVD interface, aspiration failure during suctioning, chest tube failure, tissue injury and deep vein thrombosis were selected for improvement. Findings affirmed that improvement strategies were generally satisfying and significantly decreased total failures. Practical implications Application of FMEA in ICUs proved to be effective in proactively decreasing the risk of failures and corrected the control measures up to acceptable levels in all eight areas of function. Originality/value Using a prospective risk assessment approach, such as FMEA, could be beneficial in dealing with potential failures through proposing preventive actions in a proactive manner. The method could be used as a tool for healthcare continuous quality improvement so that the method identifies both systemic and human errors, and offers practical advice to deal effectively with them.

  17. Effect of Dilute Apple Juice and Preferred Fluids vs Electrolyte Maintenance Solution on Treatment Failure Among Children With Mild Gastroenteritis: A Randomized Clinical Trial.

    Science.gov (United States)

    Freedman, Stephen B; Willan, Andrew R; Boutis, Kathy; Schuh, Suzanne

    2016-05-10

    Gastroenteritis is a common pediatric illness. Electrolyte maintenance solution is recommended to treat and prevent dehydration. Its advantage in minimally dehydrated children is unproven. To determine if oral hydration with dilute apple juice/preferred fluids is noninferior to electrolyte maintenance solution in children with mild gastroenteritis. Randomized, single-blind noninferiority trial conducted between the months of October and April during the years 2010 to 2015 in a tertiary care pediatric emergency department in Toronto, Ontario, Canada. Study participants were children aged 6 to 60 months with gastroenteritis and minimal dehydration. Participants were randomly assigned to receive color-matched half-strength apple juice/preferred fluids (n=323) or apple-flavored electrolyte maintenance solution (n=324). Oral rehydration therapy followed institutional protocols. After discharge, the half-strength apple juice/preferred fluids group was administered fluids as desired; the electrolyte maintenance solution group replaced losses with electrolyte maintenance solution. The primary outcome was a composite of treatment failure defined by any of the following occurring within 7 days of enrollment: intravenous rehydration, hospitalization, subsequent unscheduled physician encounter, protracted symptoms, crossover, and 3% or more weight loss or significant dehydration at in-person follow-up. Secondary outcomes included intravenous rehydration, hospitalization, and frequency of diarrhea and vomiting. The noninferiority margin was defined as a difference between groups of 7.5% for the primary outcome and was assessed with a 1-sided α=.025. If noninferiority was established, a 1-sided test for superiority was conducted. Among 647 randomized children (mean age, 28.3 months; 331 boys [51.1%]; 441 (68.2%) without evidence of dehydration), 644 (99.5%) completed follow-up. Children who were administered dilute apple juice experienced treatment failure less often than those

  18. Failure time series prediction in industrial maintenance using neural networks; Previsao de series temporais de falhas em manutencao industrial usando redes neurais

    Energy Technology Data Exchange (ETDEWEB)

    Torres Junior, Rubiao G.; Machado, Maria Augusta S. [Instituto Brasileiro de Mercado de Capitais (IBMEC), Rio de Janeiro, RJ (Brazil); Souza, Reinaldo C. [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil)

    2005-07-01

    The objective of this work is the application of two failure prediction models in industrial maintenance with the use of Artificial Neural Networks (ANN). A characteristic of the modern industrial environment is a strong competition which leads companies to search for costs minimization methods. Thus, dada gathering and maintenance dada treatment becomes extremely important in this scenario for it aims the equipment and plant systems real repair necessity. Therefore, the objective becomes the widening of the system's full activity in a continuous manner, in the required period, without problems in their integrating parts. A daily time series is modeled based on maintenance interventions pauses dada from a five years period derived form many productive systems in the finalization areas of PETROFLEX Ind. and Com. S.A. Thus, the purpose is to introduce models based on neural networks and verify its system's pauses prediction capacity, so as to intervene with adequate timing before the system fails, extend the operational period and consequently increase its availability. The results obtained in this work demonstrate the employment of Neural Networks in the prediction of pauses in PETROFLEX industrial area maintenance. The ANN's prediction capacity in a group of dada with strong non-linear component where other statistical techniques have shown little efficient has also been confirmed. Discover neural models to predict failure systems time series has enable a breakthrough in the research field, especially due to the market demand. It's no doubt a technique that will evolve in the industrial maintenance area financing important managing decision. Prediction techniques, such as the ones illustrated in this study, work side by side maintenance planning and if carefully implemented and followed up can in the medium run supply a substantial increase in the available operational hours. (author)

  19. PENERAPAN MODEL PREVENTIVE MAINTENANCE SMITH DAN DEKKER DI PD. INDUSTRI UNIT INKABA

    Directory of Open Access Journals (Sweden)

    Hari Adianto

    2005-01-01

    Full Text Available The globalization era along with fast development of technology%2C industries must try to increase the quantity and quality of products that they have produced. The development of industrial products which have been increase continually need support from fluency of production process. In this case the industrial companies want a high availability system. PD Industri Unit Inkaba is one of the companies that moves in sector rubber technique industry. The company wants the production process go smoothly so that the company can keeps the existence and increases the product’s quality with cost efficiency and can competes with foreign markets. The smoothness of production process needs support from machines or production’s tools that have good condition. To keep the machines in good condition so that they will in the optimal condition when used%2C then the machines need to be maintained. M.A.J. Smith dan R. Dekker develop a model that combine availability model and preventive maintenance and consider the expected uptime and downtime of the system. This model is a 1 out of n system model%2C which has one operating machine and support by (n – 1 unit machine reserves. A 1 out of n system is also applicable to replaceable components. Smith and Dekker’s model gives the expected uptime and downtime of the system approximation that can gives good approximation of long term average operating cost. The results from decision of component preventive replacement age and optimal number of component reserve are expected to be able to keep the reliability system and be able to avoid the decease of availability system because of maintenance activity. Abstract in Bahasa Indonesia : Dalam era persaingan industri yang semakin global disertai perkembangan teknologi yang pesat%2C industri-industri terus berusaha meningkatkan kuantitas dan kualitas produk yang dihasilkannya. Perkembangan hasil industri yang semakin meningkat secara terus-menerus memerlukan dukungan

  20. Common-cause failure analysis of McGuire Unit 2 auxiliary feedwater system

    International Nuclear Information System (INIS)

    Rasmuson, D.M.; Shepherd, J.C.; Fowler, R.D.; Summitt, R.L.; Logan, B.W.

    1982-01-01

    A powerful method for qualitative common cause failure analysis (CCFA) of nuclear power plant systems was developed by EG and G Idaho at the Idaho National Engineering Laboratory. As a cooperative project to demonstrate and evaluate the usefulness of the method, the Duke Power Company agreed to allow a CCFA of the auxiliary feedwater system (AFWS) in their McGuire Nuclear Station Unit 2. The results of the CCFA are the subject of this discussion

  1. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT IV, MAINTAINING THE COOLING SYSTEM--DETROIT DIESEL ENGINES.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE COOLING SYSTEM. TOPICS ARE PURPOSE OF THE COOLING SYSTEM, CARE MAINTENANCE OF THE COOLING SYSTEM, COOLING SYSTEM COMPONENTS, AND TROUBLESHOOTING TIPS. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING…

  2. AUTOMOTIVE DIESEL MAINTENANCE, UNIT V, MAINTAINING THE LUBRICATION SYSTEM--DETROIT DIESEL ENGINE.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE LUBRICATION SYSTEM. TOPICS ARE LUBE OILS USED, MAINTENANCE OF THE LUBRICATION SYSTEM, AND CRANKCASE VENTILATION COMPONENTS. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM "BASIC ENGINE…

  3. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT III, MAINTAINING THE FUEL SYSTEM--DETROIT DIESEL ENGINE.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM. TOPICS ARE (1) PURPOSE OF THE FUEL SYSTEM, (2) TRACING THE FUEL FLOW, (3) MINOR COMPONENTS OF THE FUEL SYSTEM, (4) MAINTENANCE TIPS, (5) CONSTRUCTION AND FUNCTION OF THE FUEL INJECTORS, AND (6)…

  4. Excellence method in maintenance with application for cryogenic nuclear unit (EMAC)

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2006-01-01

    Full text: Cryogenic Nuclear Plant (CNP) has as main objectives the development of a technology for the removal of tritium from heavy water used in nuclear plants of CANDU type and finding of a methodology for complete inspection of the equipment used in the presence of tritium at very low temperatures. These aims imply achieving two main stages. The first stage concerns the maintenance conception on a scientific basis, while the second stage concerns the implementation. The first stage implies the management of maintenance in constraints relating to quality, risk and cost. The second stage regards the aspect of design and technology of CNP maintenance. The solution adequate with this conception will lead to a solution viable for implementation. The operative maintenance will be based on RCM (Reliability Centered Maintenance), using NOLAN and HEAP 1978 methodologies. The integrated maintenance through research and implementation demonstrates the design, realization of equipment, the dynamic and and the static complex uses of EMAC in CNP. It is a method of conception and implementation that integrates maintenance for the life cycle in the considered cryogenics systems. The implementation is achieved by means of the software LabVIEW applied to the specific objectives of the Program for Operative Maintenance in Temporal Dynamic Regime (POMTDR). (author)

  5. Penerapan Preventive Maintenance Untuk Meningkatkan Reliability Pada Boiler Feed Pump PLTU Tarahan Unit 3 & 4

    OpenAIRE

    Saputra, Melki

    2015-01-01

    Pemeliharaan dan perawatan merupakan kegiatan untuk menjamin mesin dapat bekerja sebagaimana mestinya. Pemeliharaan dan perawatan menyeluruh untuk meningkatkan produktivitas perusahaan dikenal dengan Preventive Maintenance. pemeliharaan keterlibatan operator melalui kegiatan autonomous maintenance. PT. PLN (Persero) Pembangkitan Sumatera Bagian Selatan Sektor Tarahan merupakan salah satu perusahaan penghasil listrik dan semua mesinnya beroperasi selama 24 jam. Beroperasinya mesin secara c...

  6. Successful factors to a better maintenance effectiveness in Cernavoda NPP 's Unit 1

    International Nuclear Information System (INIS)

    Riedel, M.; Bigu, D.

    2001-01-01

    Two tables are presented titled 'Existing maintenance-specific and maintenance-related plant programs' and 'New programs intended to be developed', respectively. In the first table the following items are indicated and commented: 1. Corrective maintenance program; 2. EQ Program; 3. Equipment maintenance history program; 4. In service inspection program; 5. Lube oil analysis program; 6. MOVs program; 7. Operational test procedures; 8. Performance evaluation program; 9. Preventive maintenance program; 10. Spares management program; 11. Vibration monitoring program. In table 2 the following items are indicated and commented: 1. Check Valves program; 2. Electrical Cable Diagnostics; 3. Erosion-corrosion; 4. Temperature monitoring (infra red thermography; noncontact thermometer); 5. Airborne Ultrasound Detection program; 6. PdM Program. A flowchart is presented in figure 1 showing the maintenance strategies' selection. In figure 2 there is presented a flowchart showing the plants maintenance current approach. Finally, in figure 3 the station maintenance program is presented in a diagram structured on the following fields: concepts, requirements, strategies, specific programs and plans

  7. Failure mechanisms of additively manufactured porous biomaterials: Effects of porosity and type of unit cell.

    Science.gov (United States)

    Kadkhodapour, J; Montazerian, H; Darabi, A Ch; Anaraki, A P; Ahmadi, S M; Zadpoor, A A; Schmauder, S

    2015-10-01

    Since the advent of additive manufacturing techniques, regular porous biomaterials have emerged as promising candidates for tissue engineering scaffolds owing to their controllable pore architecture and feasibility in producing scaffolds from a variety of biomaterials. The architecture of scaffolds could be designed to achieve similar mechanical properties as in the host bone tissue, thereby avoiding issues such as stress shielding in bone replacement procedure. In this paper, the deformation and failure mechanisms of porous titanium (Ti6Al4V) biomaterials manufactured by selective laser melting from two different types of repeating unit cells, namely cubic and diamond lattice structures, with four different porosities are studied. The mechanical behavior of the above-mentioned porous biomaterials was studied using finite element models. The computational results were compared with the experimental findings from a previous study of ours. The Johnson-Cook plasticity and damage model was implemented in the finite element models to simulate the failure of the additively manufactured scaffolds under compression. The computationally predicted stress-strain curves were compared with the experimental ones. The computational models incorporating the Johnson-Cook damage model could predict the plateau stress and maximum stress at the first peak with less than 18% error. Moreover, the computationally predicted deformation modes were in good agreement with the results of scaling law analysis. A layer-by-layer failure mechanism was found for the stretch-dominated structures, i.e. structures made from the cubic unit cell, while the failure of the bending-dominated structures, i.e. structures made from the diamond unit cells, was accompanied by the shearing bands of 45°. Copyright © 2015 Elsevier Ltd. All rights reserved.

  8. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  9. Fatal injuries among grounds maintenance workers: United States, 2003--2008.

    Science.gov (United States)

    2011-05-06

    A total of 1,142 grounds maintenance workers (GMWs) were fatally injured at work during 2003--2008, an average of 190 each year. GMWs accounted for 3.4% of all occupational fatalities, and 31% of those GMWs were Hispanic or Latino. Approximately 83% of the Hispanic or Latino GMWs who died were born outside the United States. In 2008, approximately 1.52 million persons were employed as GMWs, constituting 1.0% of the U.S. workforce. During 2003--2007, an average of 13.3 per 100,000 employed GMWs died each year, compared with an overall rate of 4.0 fatalities per 100,000 U.S. workers. The rate of on-the-job fatal injuries among GMWs has remained elevated relative to other workers for >20 years. This report characterizes events leading to GMW fatalities and differences in fatality characteristics across demographic groups among GMWs, based on an evaluation of 2003--2008 data from the U.S. Department of Labor's Bureau of Labor Statistics (BLS) Census of Fatal Occupational Injuries (CFOI) program. The report also identifies workplace interventions that might reduce the incidence of fatal injuries. Major events leading to GMW occupational fatalities included transportation incidents (31%), contact with objects and equipment (25%), falls (23%), and traumatic acute exposures to harmful substances or environments (e.g., electrocution and drowning) (16%). To reduce the incidence of such fatalities, employers, trade and worker associations, and policy makers should focus on effective, targeted workplace safety interventions such as frequent hazard identification and training for specific hazards. Diversity among the populations of workers requires use of culture- and language-appropriate training techniques as part of comprehensive injury and illness prevention programs.

  10. The constant failure rate model for fault tree evaluation as a tool for unit protection reliability assessment

    International Nuclear Information System (INIS)

    Vichev, S.; Bogdanov, D.

    2000-01-01

    The purpose of this paper is to introduce the fault tree analysis method as a tool for unit protection reliability estimation. The constant failure rate model applies for making reliability assessment, and especially availability assessment. For that purpose an example for unit primary equipment structure and fault tree example for simplified unit protection system is presented (author)

  11. Experience based reliability centered maintenance

    International Nuclear Information System (INIS)

    Haenninen, S.; Laakso, K.

    1993-03-01

    The systematic analysis and documentation of operating experiences should be included in a living NPP life management program. Failure mode and effects and maintenance effects analyses are suitable methods for analysis of the failure and corrective maintenance experiences of equipment. Combined use of the information on occurred functional failures and the decision tree logic of the reliability centered maintenance identifies applicable and effective preventive maintenance tasks of equipment in an old plant. In this study the electrical motor drives of closing and isolation valves (MOV) of TVO and Loviisa nuclear power plants were selected to serve as pilot study objects. The study was limited to valve drives having actuators manufactured by AUMA in Germany. The fault and maintenance history of MOVs from 1981 up to and including October 1991 in different safety and process systems at TVO 1 and 2 nuclear power units was at first analyzed in a systematic way. The scope of the components studied was 81 MOVs in safety-related systems and 127 other MOVs per each TVO unit. In the case of the Loviisa plant, the observation period was limited to three years, i.e. from February 1989 up to February 1992. The scope of the Loviisa 1 and 2 components studied was 44 respectively 95 MOVs. (25 refs., 22 figs., 8 tabs.)

  12. Developing a Predictive for Unscheduled Maintenance Requirements on United States Air Force Installations

    National Research Council Canada - National Science Library

    Kovich, Matthew D; Norton, J. D

    2008-01-01

    .... This paper develops one such method by using linear regression and time series analysis to develop a predictive model to forecast future year man-hour and funding requirements for unscheduled maintenance...

  13. Developing a Predictive Model for Unscheduled Maintenance Requirements on United States Air Force Installations

    National Research Council Canada - National Science Library

    Kovich, Matthew D; Norton, J. D

    2008-01-01

    .... This paper develops one such method by using linear regression and time series analysis to develop a predictive model to forecast future year man-hour and funding requirements for unscheduled maintenance...

  14. Maintenance model for the No. 2 1300 MW unit at Philippsburg nuclear power station

    International Nuclear Information System (INIS)

    Gamer, M.; Jaeger, E.; Woehrle, G.

    1983-01-01

    In 1979 a maintenance model to the scale 1:1 was constructed for the second extension of Philippsburg Nuclear Power Station. The objective of this model, the building of which was completed at the end of 1982, the physical arrangement of the overall maintenance regime and the practice-oriented application of the ergonomics, in particular in relation to the optimization of the man-machine interface, are described. (orig.) [de

  15. Integrated Logistics Support Analysis of the International Space Station Alpha, Background and Summary of Mathematical Modeling and Failure Density Distributions Pertaining to Maintenance Time Dependent Parameters

    Science.gov (United States)

    Sepehry-Fard, F.; Coulthard, Maurice H.

    1995-01-01

    The process of predicting the values of maintenance time dependent variable parameters such as mean time between failures (MTBF) over time must be one that will not in turn introduce uncontrolled deviation in the results of the ILS analysis such as life cycle costs, spares calculation, etc. A minor deviation in the values of the maintenance time dependent variable parameters such as MTBF over time will have a significant impact on the logistics resources demands, International Space Station availability and maintenance support costs. There are two types of parameters in the logistics and maintenance world: a. Fixed; b. Variable Fixed parameters, such as cost per man hour, are relatively easy to predict and forecast. These parameters normally follow a linear path and they do not change randomly. However, the variable parameters subject to the study in this report such as MTBF do not follow a linear path and they normally fall within the distribution curves which are discussed in this publication. The very challenging task then becomes the utilization of statistical techniques to accurately forecast the future non-linear time dependent variable arisings and events with a high confidence level. This, in turn, shall translate in tremendous cost savings and improved availability all around.

  16. Airline experience with reliability-centered maintenance

    International Nuclear Information System (INIS)

    Matteson, T.D.

    1985-01-01

    Reliability-Centered Maintenance is a process for developing preventive maintenance programs. Its concepts evolved from the post WWII experience of the airline community. Its genesis was in a paper by F. Stanley Nowlan and Thomas D. Matteson of United Airlines for the American Institute of Aeronautics and Astronautics in 1967. Its first application was to the Boeing 747. It has subsequently been adopted by the FAA and the Department of Defense and applied to many new transport and military aircraft. Its objective is applicable and effective preventive maintenance and it has proven to be a highly effective replacement for the prior intuitive processes for selective preventive maintenance tasks. It focuses on system functions, functional failures, then dominant failure modes and effects. It then uses a decision tree to classify failure criticality and identify applicable and effective tasks. The result is a program focused on maintaining inherent safety and reliability at minimum cost. (orig.)

  17. Airline experience with reliability-centered maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Matteson, T.D.

    1985-11-01

    Reliability-Centered Maintenance is a process for developing preventive maintenance programs. Its concepts evolved from the post WWII experience of the airline community. Its genesis was in a paper by F. Stanley Nowlan and Thomas D. Matteson of United Airlines for the American Institute of Aeronautics and Astronautics in 1967. Its first application was to the Boeing 747. It has subsequently been adopted by the FAA and the Department of Defense and applied to many new transport and military aircraft. Its objective is applicable and effective preventive maintenance and it has proven to be a highly effective replacement for the prior intuitive processes for selective preventive maintenance tasks. It focuses on system functions, functional failures, then dominant failure modes and effects. It then uses a decision tree to classify failure criticality and identify applicable and effective tasks. The result is a program focused on maintaining inherent safety and reliability at minimum cost. (orig.).

  18. Solid Waste Management Units And Areas Of Concern Annual Long-Term Monitoring & Maintenance Report For Calendar Year 2016.

    Energy Technology Data Exchange (ETDEWEB)

    Dotson, Patrick Wells [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Little, Bonnie Colleen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-02-01

    Long-term controls were maintained at 21 Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) in accordance with the requirements of the “Long-Term Monitoring and Maintenance Plan for SWMUs and AOCs Granted Corrective Action Complete with Controls” in Attachment M of the Resource Conservation and Recovery Act Facility Operating Permit, which took effect February 26, 2015. Maintenance and controls at these SWMUs and AOCs are described and documented in this report. Conditions requiring maintenance or repair activities were not identified for any of the inspected SWMUs or AOCs. Based upon the inspections performed and site conditions observed, the administrative and physical institutional controls in place at the SWMUs and AOCs are effectively providing continued protection of human health and the environment. This report does not present monitoring and maintenance activities for SWMU 76, the Mixed Waste Landfill; those activities adhere to the approved MWL LTMM Plan, Section 4.8.1 requiring a separate annual report which will be submitted to the NMED by June 30, 2017.

  19. Bayesian framework for prediction of future number of failures from a single group of units in the field

    International Nuclear Information System (INIS)

    Ebrahimi, Nader

    2009-01-01

    This paper considers prediction of unknown number of failures in a future inspection of a group of in-service units based on number of failures observed from an earlier inspection. We develop a flexible Bayesian model and calculate Bayesian estimator for this unknown number and other quantities of interest. The paper also includes an illustration of our method in an example about heat exchanger. A main advantage of our approach is in its nonparametric nature. By nonparametric here we simply mean that no assumption is required about the failure time distribution of a unit

  20. GRAPHICAL MODELS OF THE AIRCRAFT MAINTENANCE PROCESS

    Directory of Open Access Journals (Sweden)

    Stanislav Vladimirovich Daletskiy

    2017-01-01

    Full Text Available The aircraft maintenance is realized by a rapid sequence of maintenance organizational and technical states, its re- search and analysis are carried out by statistical methods. The maintenance process concludes aircraft technical states con- nected with the objective patterns of technical qualities changes of the aircraft as a maintenance object and organizational states which determine the subjective organization and planning process of aircraft using. The objective maintenance pro- cess is realized in Maintenance and Repair System which does not include maintenance organization and planning and is a set of related elements: aircraft, Maintenance and Repair measures, executors and documentation that sets rules of their interaction for maintaining of the aircraft reliability and readiness for flight. The aircraft organizational and technical states are considered, their characteristics and heuristic estimates of connection in knots and arcs of graphs and of aircraft organi- zational states during regular maintenance and at technical state failure are given. It is shown that in real conditions of air- craft maintenance, planned aircraft technical state control and maintenance control through it, is only defined by Mainte- nance and Repair conditions at a given Maintenance and Repair type and form structures, and correspondingly by setting principles of Maintenance and Repair work types to the execution, due to maintenance, by aircraft and all its units mainte- nance and reconstruction strategies. The realization of planned Maintenance and Repair process determines the one of the constant maintenance component. The proposed graphical models allow to reveal quantitative correlations between graph knots to improve maintenance processes by statistical research methods, what reduces manning, timetable and expenses for providing safe civil aviation aircraft maintenance.

  1. A Case of Biotinidase Deficiency in an Adult with Respiratory Failure in the Intensive Care Unit

    Directory of Open Access Journals (Sweden)

    Zerrin Demirtürk

    2016-10-01

    Full Text Available Background: Biotinidase deficiency (BD is a rare, inherited autosomal recessive disorder that is treatable within childhood. We present a patient with pneumonia and respiratory acidosis who was not diagnosed with any systemic disorders; the patient was finally diagnosed as BD. Case Report: A thirty-year-old woman was admitted to the emergency department with respiratory failure that had persisted for a few days and progressively weakening over the previous six months. Then, the patient was admitted to the intensive care unit with marked respiratory acidosis, respiratory failure and alterations in consciousness. At the follow-up, the patient was not diagnosed with a systematic disorder. Rather, the patient’s historical clinical findings suggested a metabolic disorder. Finally, the patient was diagnosed with biotinidase deficiency. Conclusion: Even though biotinidase deficiency is not frequently seen in the intensive care unit, metabolic syndromes such as biotinidase deficiency should be considered. Patients should be evaluated holistically with attention to medical history, family history and clinical findings.

  2. AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT X, AUTOMATIC TRANSMISSIONS--HYDRAULIC SYSTEMS (PART II).

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO PROVIDE A SUMMARY OF MAINTENANCE PROCEDURES FOR AUTOMATIC TRANSMISSIONS USED ON DIESEL POWERED VEHICLES. TOPICS ARE (1) CHECKING THE HYDRAULIC SYSTEM, (2) SERVICING THE HYDRAULIC SYSTEM, (3) EXAMINING THE RANGE CONTROL VALVE, (4) EXAMINING THE LOCK-UP AND FLOW VALVE, (5) EXAMINING THE MAIN REGULATOR…

  3. AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT XV, UNDERSTANDING DC GENERATOR PRINCIPLES (PART II).

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF MAINTENANCE PROCEDURES FOR DIRECT CURRENT GENERATORS USED ON DIESEL POWERED EQUIPMENT. TOPICS ARE SPECIAL GENERATOR CIRCUITS, GENERATOR TESTING, AND GENERATOR POLARITY. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL PROGRAMED TRAINING FILM "DC GENERATORS II--GENERATOR…

  4. AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT V, AUTOMATIC TRANSMISSIONS--TORQUE CONVERTER.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF TORQUE CONVERTERS USED ON DIESEL POWERED VEHICLES. TOPICS ARE (1) FLUID COUPLINGS (LOCATION AND PURPOSE), (2) PRINCIPLES OF OPERATION, (3) TORQUE CONVERRS, (4) TORQMATIC CONVERTER, (5) THREE STAGE, THREE ELEMENT TORQUE CONVERTER, AND (6)…

  5. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT VI, MAINTAINING MECHANICAL GOVERNORS--DETROIT DIESEL ENGINES.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF MECHANICAL GOVERNORS USED ON DIESEL ENGINES. TOPICS ARE (1) TYPES OF GOVERNORS AND ENGINE LOCATION, (2) GOVERNOR APPLICATIONS, (3) LIMITING SPEED MECHANICAL GOVERNOR, (4) VARIABLE SPEED MECHANICAL GOVERNOR, AND (5) CONSTANT SPEED…

  6. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT II, MAINTAINING THE AIR SYSTEM--DETROIT DIESEL ENGINES.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE AIR SYSTEM. TOPICS ARE (1) OPERATION AND FUNCTION, (2) AIR CLEANER, (3) AIR SHUT-DOWN HOUSING, (4) EXHAUST SYSTEM, (5) BLOWER, (6) TURBOCHARGER, AND (7) TROUBLE-SHOOTING TIPS ON THE AIR SYSTEM. THE MODULE CONSISTS OF A…

  7. Pilgrim Nuclear Power Station, Unit 1. Fifth semiannual operating and maintenance report, July--December 1974

    International Nuclear Information System (INIS)

    1974-01-01

    During this period the reactor was critical for 3,550.3 hrs and the net electrical power generated was 1,973,033 MWH. Information is presented concerning operations, maintenance, radioactive effluents, environmental monitoring, and radioactive materials released to unrestricted areas. (U.S.)

  8. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XXII, I--MAINTAINING THE FUEL SYSTEM (PART I)--CUMMINS DIESEL ENGINE, II--UNDERSTANDING THE DIFFERENTIAL.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE FUNCTION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND DIFFERENTIAL DRIVE UNITS USED IN DIESEL POWERED VEHICLES. TOPICS ARE (1) FUEL SYSTEM COMPARISONS, (2) FUEL SYSTEM SUPPLY COMPONENTS, (3) FUEL SUPPLY SECTION MAINTENANCE, (4) FUNCTION OF THE DIFFERENTIAL,…

  9. Cross-Linguistic Analysis of Vietnamese and English with Implications for Vietnamese Language Acquisition and Maintenance in the United States

    Directory of Open Access Journals (Sweden)

    Giang Tang

    2007-01-01

    Full Text Available Two overall goals of this paper are a to provide a linguistic basis for promoting first language maintenance of Vietnamese in a larger United States context and b to stimulate future research in language acquisition of Vietnamese-English speakers. This paper is divided into three sections. Section 1 discusses previous studies on first language (L1 maintenance among Vietnamese Americans. Section 2 presents a cross-linguistic comparison of Vietnamese and English across speech-sound, word, and grammatical language levels. A cross-linguistic analysis may help educators better understand speaking patterns of Vietnamese American students. Based on this cross-linguistic comparison, Section 3 presents potential bi-directional interactions between Vietnamese and English within an individual speaker. These predictions are intended to provide a framework for future empirical studies related to bilingual development.

  10. Emergency diesel generating sets for the 900 MW PWR units operation and maintenance policy

    International Nuclear Information System (INIS)

    Guillon, A.; Lallier, M.

    1986-01-01

    In order to improve the reliability of the emergency diesel generating EDF has taken steps to ensure that: - sets are only started up when they are really needed, in order to reduce the thermal cycles and the mechanical stresses associated with start-up. - the maintenance policy is adapted to the conditions of use, by including the notion of a start-up being equivalent to a predetermined number of hours of operation. (authors)

  11. Emergency diesel generating sets for the 900 MW PWR units operation and maintenance policy

    Energy Technology Data Exchange (ETDEWEB)

    Guillon, A.; Lallier, M. [Electricite de France - EDF, Service de la Production Thermique, 3 rue de Messine, 75384 Paris Cedex 08 (France)

    1986-02-15

    In order to improve the reliability of the emergency diesel generating EDF has taken steps to ensure that: - sets are only started up when they are really needed, in order to reduce the thermal cycles and the mechanical stresses associated with start-up. - the maintenance policy is adapted to the conditions of use, by including the notion of a start-up being equivalent to a predetermined number of hours of operation. (authors)

  12. Main indicators used in french PWR units for safety, operation and maintenance

    International Nuclear Information System (INIS)

    Guio, J.M. de

    1990-01-01

    The development of analyses aimed at improving nuclear plant operations through an optimum use of experience feedback naturally leads to the implementation of trend indicators in the fields of safety, operation and maintenance. This process, part of the more general framework of promoting safety culture, facilitates collective thinking on these matters at the local site level, and, at the national level, allows a clearer definition of the main lines of strategy and helps coordinate the resulting actions

  13. Maintenance and repair aspects of the steam generator modules for the United States' LMFBR demonstration plant

    Energy Technology Data Exchange (ETDEWEB)

    Devlin, R W

    1975-07-01

    This paper describes the main considerations relating to the field maintenance and repair of the steam generator modules for the Clinch River Breeder Reactor Plant and the development approaches being employed for some of the critical elements of these operations. In particular, the approach to plant chemical cleaning of the waterside of the modules and the approach to recovery from leaks between the water and sodium sides of the modules are discussed. (author)

  14. Maintenance and repair aspects of the steam generator modules for the United States' LMFBR demonstration plant

    International Nuclear Information System (INIS)

    Devlin, R.W.

    1975-01-01

    This paper describes the main considerations relating to the field maintenance and repair of the steam generator modules for the Clinch River Breeder Reactor Plant and the development approaches being employed for some of the critical elements of these operations. In particular, the approach to plant chemical cleaning of the waterside of the modules and the approach to recovery from leaks between the water and sodium sides of the modules are discussed. (author)

  15. Concept and methodology for evaluating core damage frequency considering failure correlation at multi units and sites and its application

    Energy Technology Data Exchange (ETDEWEB)

    Ebisawa, K.; Teragaki, T.; Nomura, S. [Former Incorporated Administrative Agency, Japan Nuclear Safety Organization (Japan); Abe, H., E-mail: Hiroshi_abe@nsr.go.jp [Former Incorporated Administrative Agency, Japan Nuclear Safety Organization (Japan); Shigemori, M.; Shimomoto, M. [Mizuho Information & Research Institute, 2-3, Kanda-Nishikicho, Chiyoda-ku, Tokyo (Japan)

    2015-07-15

    Highlights: • We develop a method to evaluate CDF considering failure correlation at multi units. • We develop a procedure to evaluate correlation coefficient between multi components. • We evaluate CDF at two different BWR units using correlation coefficients. • We confirm the validity of method and correlation coefficient through the evaluation. - Abstract: The Tohoku earthquake (Mw9.0) occurred on March 11, 2011 and caused a large tsunami. The Fukushima Daiichi Nuclear Power Plant with six units were overwhelmed by the tsunami and core damage occurred. Authors proposed the concept and method for evaluating core damage frequency (CDF) considering failure correlation at the multi units and sites. Based on the above method, one of authors developed the procedure for evaluating the failure correlation coefficient and response correlation coefficient between the multi components under the strong seismic motion. These method and failure correlation coefficients were applied to two different BWR units and their CDF was evaluated by seismic probabilistic risk assessment technology. Through this quantitative evaluation, the validity of the method and failure correlation coefficient was confirmed.

  16. Concept and methodology for evaluating core damage frequency considering failure correlation at multi units and sites and its application

    International Nuclear Information System (INIS)

    Ebisawa, K.; Teragaki, T.; Nomura, S.; Abe, H.; Shigemori, M.; Shimomoto, M.

    2015-01-01

    Highlights: • We develop a method to evaluate CDF considering failure correlation at multi units. • We develop a procedure to evaluate correlation coefficient between multi components. • We evaluate CDF at two different BWR units using correlation coefficients. • We confirm the validity of method and correlation coefficient through the evaluation. - Abstract: The Tohoku earthquake (Mw9.0) occurred on March 11, 2011 and caused a large tsunami. The Fukushima Daiichi Nuclear Power Plant with six units were overwhelmed by the tsunami and core damage occurred. Authors proposed the concept and method for evaluating core damage frequency (CDF) considering failure correlation at the multi units and sites. Based on the above method, one of authors developed the procedure for evaluating the failure correlation coefficient and response correlation coefficient between the multi components under the strong seismic motion. These method and failure correlation coefficients were applied to two different BWR units and their CDF was evaluated by seismic probabilistic risk assessment technology. Through this quantitative evaluation, the validity of the method and failure correlation coefficient was confirmed

  17. Screening and treatment for heritable thrombophilia in pregnancy failure: inconsistencies among UK early pregnancy units.

    Science.gov (United States)

    Norrie, Gillian; Farquharson, Roy G; Greaves, Mike

    2009-01-01

    The significance of heritable thrombophilia in pregnancy failure is controversial. We surveyed all UK Early Pregnancy Units and 70% responded. The majority test routinely for heritable thrombophilias; 80%, 76% and 88% undertook at least one screening test in late miscarriage, recurrent miscarriage and placental abruption, respectively. The range of thrombophilias sought is inconsistent: testing for proteins C and S deficiency and F5 R506Q (factor V Leiden) is most prevalent. Detection of heritable thrombophilia frequently leads to administration of antithrombotics in subsequent pregnancies. Thus, thrombophilia testing and use of antithrombotics are widespread in the UK despite controversies regarding the role of heritable thrombophilia in the pathogenesis of pregnancy complications, and the lack of robust evidence for the efficacy of antithrombotic therapy.

  18. Bridging the conservation design and delivery gap for wetland bird habitat maintenance and restoration in the Midwestern United States

    Science.gov (United States)

    Thogmartin, W.E.; Potter, B.; Soulliere, G.

    2011-01-01

    The U.S. Fish and Wildlife Service's adoption of Strategic Habitat Conservation is intended to increase the effectiveness and efficiency of conservation delivery by targeting effort in areas where biological benefits are greatest. Conservation funding has not often been allocated in accordance with explicit biological endpoints, and the gap between conservation design (the identification of conservation priority areas) and delivery needs to be bridged to better meet conservation goals for multiple species and landscapes. We introduce a regional prioritization scheme for North American Wetlands Conservation Act funding which explicitly addresses Midwest regional goals for wetland-dependent birds. We developed decision-support maps to guide conservation of breeding and non-breeding wetland bird habitat. This exercise suggested ~55% of the Midwest consists of potential wetland bird habitat, and areas suited for maintenance (protection) were distinguished from those most suited to restoration. Areas with greater maintenance focus were identified for central Minnesota, southeastern Wisconsin, the Upper Mississippi and Illinois rivers, and the shore of western Lake Erie and Saginaw Bay. The shores of Lakes Michigan and Superior accommodated fewer waterbird species overall, but were also important for wetland bird habitat maintenance. Abundant areas suited for wetland restoration occurred in agricultural regions of central Illinois, western Iowa, and northern Indiana and Ohio. Use of this prioritization scheme can increase effectiveness, efficiency, transparency, and credibility to land and water conservation efforts for wetland birds in the Midwestern United States.

  19. Factors associated with variations in hospital expenditures for acute heart failure in the United States.

    Science.gov (United States)

    Ziaeian, Boback; Sharma, Puza P; Yu, Tzy-Chyi; Johnson, Katherine Waltman; Fonarow, Gregg C

    2015-02-01

    Relatively little contemporary data are available that describe differences in acute heart failure (AHF) hospitalization expenditures as a function of patient and hospital characteristics, especially from a population-based investigation. This study aimed to evaluate factors associated with variations in hospital expenditures for AHF in the United States. A cross-sectional analysis using discharge data from the 2011 Nationwide Inpatient Sample, Healthcare Cost and Utilization Project, was conducted. Discharges with primary International Classification of Diseases, Ninth Revision, Clinical Modification, diagnosis codes for AHF in adults were included. Costs were estimated by converting Nationwide Inpatient Sample charge data using the Healthcare Cost and Utilization Project Cost-to-Charge Ratio File. Discharges with highest (≥80th percentile) versus lowest (≤20th percentile) costs were compared for patient characteristics, hospital characteristics, utilization of procedures, and outcomes. Of the estimated 1 million AHF hospital discharges, the mean cost estimates were $10,775 per episode. Younger age, higher percentage of obesity, atrial fibrillation, pulmonary disease, fluid/electrolyte disturbances, renal insufficiency, and greater number of cardiac/noncardiac procedures were observed in stays with highest versus lowest costs. Highest-cost discharges were more likely to be observed in urban and teaching hospitals. Highest-cost AHF discharges also had 5 times longer length of stay, were 9 times more costly, and had higher in-hospital mortality (5.6% vs 3.5%) compared with discharges with lowest costs (all P heart failure hospitalizations are costly. Expenditures vary markedly among AHF hospitalizations in the United States, with substantial differences in patient and hospital characteristics, procedures, and in-hospital outcomes among discharges with highest compared with lowest costs. Copyright © 2014 Elsevier Inc. All rights reserved.

  20. Management of hypoxaemic respiratory failure in a Respiratory High-dependency Unit.

    Science.gov (United States)

    Hukins, Craig; Wong, Mimi; Murphy, Michelle; Upham, John

    2017-07-01

    There are limited data on outcomes of hypoxaemic respiratory failure (HRF), especially in non-intensive care unit (ICU) settings. To assess outcomes in HRF (without multi-system disease and not requiring early intubation) of patients directly admitted to a Respiratory High-dependency Unit (R-HDU). This is a retrospective cohort study of HRF compared to hypercapnic respiratory failure (HCRF) in a R-HDU (2007-2011). Patient characteristics (age, gender, pre-morbid status, diagnoses) and outcomes (non-invasive ventilation (NIV) use, survival, ICU admission) were assessed. There were 1207 R-HDU admissions in 2007-2011, 205 (17%) with HRF and 495 (41%) with HCRF. The proportion with HRF increased from 12.2% in 2007 to 20.1% in 2011 (P < 0.05). HRF patients were younger, more often male and had better pre-morbid performance. Compared to HCRF, HRF was more frequently associated with lung consolidation (61% vs 15%, P < 0.001), interstitial lung disease (12% vs 1%, P < 0.001) and pulmonary hypertension (7% vs 0%, P < 0.001) and less frequently with chronic obstructive pulmonary disease (24% vs 65%, P < 0.001) and obstructive sleep apnoea (8% vs 26%, P < 0.001). Fewer patients with HRF were treated with NIV (28% vs 87%, P < 0.001), but NIV was discontinued early more often (28% vs 7%, P < 0.001). A total of 18% with HRF was transferred to ICU compared to 6% with HCRF (P = 0.06). More patients with HRF died (19.5% vs 12.3%, P = 0.02). Interstitial lung disease, consolidation, shock, malignancy and poorer pre-morbid function were associated with increased mortality. Initial R-HDU management is an effective option in selected HRF to reduce ICU demand, although mortality and clinical deterioration despite NIV are more common than in HCRF. © 2017 Royal Australasian College of Physicians.

  1. Common cause failure analysis of the rodded scram system of the Arkansas Nuclear One-Unit 1 Plant

    International Nuclear Information System (INIS)

    Montague, D.F.; Campbell, D.J.; Flanagan, G.F.

    1986-10-01

    This study demonstrates the use of a formal method for common cause failure analysis in a reliability analysis of the Arkansas Nuclear One - Unit 1 rodded scram system. The scram system failure of interest is loss of capability of the system to shut the reactor down when required. The results of this analysis support the ATWS program sponsored by the US Nuclear Regulatory Commission. The methods used in this analysis support the NRC's Risk Methods Integration and Evaluation Program (RMIEP)

  2. Failure Mode Estimation of Wolsong Unit 1 Containment Building with respect to Severe Accident Condition

    International Nuclear Information System (INIS)

    Hahm, Dae Gi; Choi, In Kil

    2009-01-01

    The containment buildings in a nuclear power plant (NPP) are final barriers against the exposure of harmful radiation materials at severe accident condition. Since the accident at Three Mile Island nuclear plant in 1979, it has become necessary to evaluate the internal pressure capacity of the containment buildings for the assessment of the safety of nuclear power plants. According to this necessity, many researchers including Yonezawa et al. and Hu and Lin analyzed the ultimate capacity of prestressed concrete containments subjected to internal pressure which can be occurred at sever accident condition. Especially in Wolsong nuclear power plant, the Unit 1 containment structures were constructed in the late 1970 to early 1980, so that the end of its service life will be reached in near future. Since that the complete decommission and reconstruction of the NPP may cause a huge expenses, an extension of the service time can be a cost-effective alternative. To extend the service time of NPP, an overall safety evaluation of the containment building under severe accident condition should be performed. In this study, we assessed the pressure capacity of Wolsong Unit 1 containment building under severe accident, and estimated the responses at all of the probable critical areas. Based on those results, we found the significant failure modes of Wolsong Unit 1 containment building with respect to the severe accident condition. On the other hand, for the aged NPP, the degradation of their structural performance must also be explained in the procedure of the internal pressure capacity evaluation. Therefore, in this study, we performed a parametric study on the degradation effects and evaluated the internal pressure capacity of Wolsong Unit 1 containment building with considering aging and degradation effects

  3. ALARA review of the maintenance and repair jobs of repetitive high radiation dose at Kori Unit 3 and 4

    International Nuclear Information System (INIS)

    Cho, Y.H.; Moon, J.H.; Kang, C.S.; Lee, J.S.; Lee, D.H.

    2003-01-01

    The policy of maintaining occupational radiation dose (ORD) as low as reasonably achievable (ALARA) requires the effective reduction of ORD in the phases of design as well as operation of nuclear power plants. It has been identified that a predominant portion of ORD arises during maintenance and repair operations at nuclear power plants. The cost-effective reduction of ORD cannot be achieved without a comprehensive analysis of accumulated ORD data of existing nuclear power plants. To identify the jobs of repetitive high ORD, the ORD data of Kori Units 3 and 4 over 10-year period from 1986 to 1995 were compiled into the PC-based ORD database program. As the radiation job classification structure, 26 main jobs are considered, most of which are further subdivided into detailed jobs. According to the order of the collective dose values for 26 main jobs, 10 jobs of high collective dose are identified. As an ALARA review, then, top 10 jobs of high collective dose are statistically analyzed with regard to 1) dose rate, 2) crew number and 3) job frequency that are the factors determining the collective dose for the radiation job of interest. Through the ALARA review, main reasons causing to high collective dose values are identified as follows. The high collective dose of RCP maintenance job is mainly due to the large crew number and the high job frequency. The characteristics of refueling job are similar to those of RCP maintenance job. However, the high collective doses of SG-related jobs such as S/G nozzle dam job, S/G man-way job and S/G tube maintenance job are mainly due to high radiation dose rate. (author)

  4. TMI-2 [Three-Mile Island-Unit 2] rail cask and railcar maintenance

    International Nuclear Information System (INIS)

    Tyacke, M.J.; Ayers, A.L. Jr.; Ball, L.J.; Anselmo, A.A.

    1988-02-01

    This paper describes the NuPac 125-B cask system (i.e., cask and railcar), and the maintenance and inspection requirements for that system. The paper discusses the operations being done to satisfy those requirements and how, in some cases, it has been efficient for the operations to be more rigorous than the requirements. Finally, this paper discusses the experiences gained from those operations and how specific hardware and procedural enhancements have resulted in a reliable and continuous shipping campaign. 2 refs., 2 figs

  5. Age and admission times as predictive factors for failure of admissions to discharge-stream short-stay units.

    Science.gov (United States)

    Shetty, Amith L; Shankar Raju, Savitha Banagar; Hermiz, Arsalan; Vaghasiya, Milan; Vukasovic, Matthew

    2015-02-01

    Discharge-stream emergency short-stay units (ESSU) improve ED and hospital efficiency. Age of patients and time of hospital presentations have been shown to correlate with increasing complexity of care. We aim to determine whether an age and time cut-off could be derived to subsequently improve short-stay unit success rates. We conducted a retrospective audit on 6703 (5522 inclusions) patients admitted to our discharge-stream short-stay unit. Patients were classified as appropriate or inappropriate admissions, and deemed successful if discharged out of the unit within 24 h; and failures if they needed inpatient admission into the hospital. We calculated short-stay unit length of stay for patients in each of these groups. A 15% failure rate was deemed as acceptable key performance indicator (KPI) for our unit. There were 197 out of 4621 (4.3%, 95% CI 3.7-4.9%) patients up to the age of 70 who failed admission to ESSU compared with 67 out of 901 (7.4%, 95% CI 5.9-9.3%, P 70 years of age have higher rates of failure after admission to discharge-stream ESSU. Although in appropriately selected discharge-stream patients, no age group or time-band of presentation was associated with increased failure rate beyond the stipulated KPI. © 2014 Australasian College for Emergency Medicine and Australasian Society for Emergency Medicine.

  6. DUSTMS-D: DISPOSAL UNIT SOURCE TERM - MULTIPLE SPECIES - DISTRIBUTED FAILURE DATA INPUT GUIDE.

    Energy Technology Data Exchange (ETDEWEB)

    SULLIVAN, T.M.

    2006-01-01

    Performance assessment of a low-level waste (LLW) disposal facility begins with an estimation of the rate at which radionuclides migrate out of the facility (i.e., the source term). The focus of this work is to develop a methodology for calculating the source term. In general, the source term is influenced by the radionuclide inventory, the wasteforms and containers used to dispose of the inventory, and the physical processes that lead to release from the facility (fluid flow, container degradation, wasteform leaching, and radionuclide transport). Many of these physical processes are influenced by the design of the disposal facility (e.g., how the engineered barriers control infiltration of water). The complexity of the problem and the absence of appropriate data prevent development of an entirely mechanistic representation of radionuclide release from a disposal facility. Typically, a number of assumptions, based on knowledge of the disposal system, are used to simplify the problem. This has been done and the resulting models have been incorporated into the computer code DUST-MS (Disposal Unit Source Term-Multiple Species). The DUST-MS computer code is designed to model water flow, container degradation, release of contaminants from the wasteform to the contacting solution and transport through the subsurface media. Water flow through the facility over time is modeled using tabular input. Container degradation models include three types of failure rates: (a) instantaneous (all containers in a control volume fail at once), (b) uniformly distributed failures (containers fail at a linear rate between a specified starting and ending time), and (c) gaussian failure rates (containers fail at a rate determined by a mean failure time, standard deviation and gaussian distribution). Wasteform release models include four release mechanisms: (a) rinse with partitioning (inventory is released instantly upon container failure subject to equilibrium partitioning (sorption) with

  7. Dual-stream modulation failure: a novel hypothesis for the formation and maintenance of delusions in schizophrenia.

    Science.gov (United States)

    Speechley, William J; Ngan, Elton T C

    2008-01-01

    Delusions, a cardinal feature of schizophrenia, are characterized by the development and preservation of false beliefs despite reason and evidence to the contrary. A number of cognitive models have made important contributions to our understanding of delusions, though it remains unclear which core cognitive processes are malfunctioning to enable individuals with delusions to form and maintain erroneous beliefs. We propose a modified dual-stream processing model that provides a viable and testable mechanism that can account for this debilitating symptom. Dual-stream models divide decision-making into two streams: a fast, intuitive and automatic form of processing (Stream 1); and a slower, conscious and deliberative process (Stream 2). Our novel model proposes two key influences on the way these streams interact in everyday decision-making: conflict and emotion. Conflict: in most decision-making scenarios one obvious answer presents itself and the two streams converge onto the same conclusion. However, in instances where there are competing alternative possibilities, an individual often experiences dissonance, or a sense of conflict. The detection of this conflict biases processing towards the more deliberative Stream 2. Emotion: highly emotional states can result in behavior that is reflexive and action-oriented. This may be due to the power of emotionally valenced stimuli to bias reasoning towards Stream 1. We propose that in schizophrenia, an abnormal response to these two influences results in a pathological schism between Stream 1 and Stream 2, enabling erroneous intuitive explanations to coexist with contrary logical explanations of the same event. Specifically, we suggest that delusions are the result of a failure to reconcile the two streams due to both a failure of conflict to bias decision-making towards Stream 2 and an accentuated emotional bias towards Stream 1.

  8. Trend and pattern analysis of failures of main feedwater system components in United States commercial nuclear power plants

    International Nuclear Information System (INIS)

    Gentillon, C.D.; Meachum, T.R.; Brady, B.M.

    1987-01-01

    The goal of the trend and pattern analysis of MFW (main feedwater) component failure data is to identify component attributes that are associated with relatively high incidences of failure. Manufacturer, valve type, and pump rotational speed are examples of component attributes under study; in addition, the pattern of failures among NPP units is studied. A series of statistical methods is applied to identify trends and patterns in failures and trends in occurrences in time with regard to these component attributes or variables. This process is followed by an engineering evaluation of the statistical results. In the remainder of this paper, the characteristics of the NPRDS that facilitate its use in reliability and risk studies are highlighted, the analysis methods are briefly described, and the lessons learned thus far for improving MFW system availability and reliability are summarized (orig./GL)

  9. Peritoneal dialysis in the neonatal intensive care unit. Management of acute renal failure after a severe subgaleal hemorrhage.

    Science.gov (United States)

    Coe, Kristi; Lail, Candace

    2007-08-01

    Acute renal failure is common in the neonatal intensive care unit but is often not recognized in its early phases, when it is potentially reversible. The typical patient with acute renal failure is premature, but many term infants are also at risk. One such group is those with severe bleeding, such as a subgaleal hemorrhage. In these cases, hypovolemia can quickly progress to ischemia, which affects many organs but has profound effects on the kidney. In term infants, acute renal failure is most commonly diagnosed in those with perinatal depression. This article presents a unique case of an infant with subgaleal and intracranial bleeding that resulted in acute renal failure requiring peritoneal dialysis in the hopes of the eventual restoration of kidney function.

  10. Performance deterioration modeling and optimal preventive maintenance strategy under scheduled servicing subject to mission time

    Directory of Open Access Journals (Sweden)

    Li Dawei

    2014-08-01

    Full Text Available Servicing is applied periodically in practice with the aim of restoring the system state and prolonging the lifetime. It is generally seen as an imperfect maintenance action which has a chief influence on the maintenance strategy. In order to model the maintenance effect of servicing, this study analyzes the deterioration characteristics of system under scheduled servicing. And then the deterioration model is established from the failure mechanism by compound Poisson process. On the basis of the system damage value and failure mechanism, the failure rate refresh factor is proposed to describe the maintenance effect of servicing. A maintenance strategy is developed which combines the benefits of scheduled servicing and preventive maintenance. Then the optimization model is given to determine the optimal servicing period and preventive maintenance time, with an objective to minimize the system expected life-cycle cost per unit time and a constraint on system survival probability for the duration of mission time. Subject to mission time, it can control the ability of accomplishing the mission at any time so as to ensure the high dependability. An example of water pump rotor relating to scheduled servicing is introduced to illustrate the failure rate refresh factor and the proposed maintenance strategy. Compared with traditional methods, the numerical results show that the failure rate refresh factor can describe the maintenance effect of servicing more intuitively and objectively. It also demonstrates that this maintenance strategy can prolong the lifetime, reduce the total lifetime maintenance cost and guarantee the dependability of system.

  11. PROCESS OF CHANGES OF MAINTENANCE-FREE ONBOARD SYSTEM OPERATIONAL STATUS BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    Andrey Mikhaylovich Bronnikov

    2017-01-01

    Full Text Available In this article the authors consider the problem of simulating the process of a maintenance-free between scheduled maintenance aircraft system operational status changes, which failure during the flight leads to the disaster. On-board equipment with automatic self-repair between routine maintenance in the event the components fail is called maintenance-free. During operation, onboard equipment accumulates failures maintaining its functions with a safety level not lower than the required minimum. Trouble shooting is carried out either at the end of between-maintenance period (as a rule, or after the failure, which led to the functions disorder or to the decrease below the target level of flight safety (as an exception. The system contains both redundant and nonredundant units and elements with the known failure rates. The system can be in one of the three states: operable, extreme, failed. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. The process of system operational status changes is described with the discrete-continuous model in the flight time. Basing on the information about the probabilities of the on-board equipment being in an operable, extreme or failed state, it is possible to calculate such complex efficiency indicators as the average loss of sorties, the average operating costs, the expected number of emergency recovery operations and others. Numerical studies have been conducted to validate the proposed model. It is believed that maintenance work completely updates the system. The analysis of these indicators will allow to evaluate the maintenance-free aircraft equipment operation efficiency, as well as to make an effectiveness comparison with other methods of technical operation. The model can be also used to assess the technical operation systems performance. The model can be used to optimize the period between maintenance.

  12. Environmental management at the Grand Rapids Generating Station following the Unit No.1 headcover failure

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1993-01-01

    Failure of the headcover of Unit 1 in the Grand Rapids generating station in March, 1992 caused the station to flood, releasing several thousand gallons of oil and removing the station from service for several weeks. Environmental considerations were a considerable part of the station restoration activities, reservoir and flow management programs and responses to public concerns arising from the accident. A major oil spill containment and cleanup program was undertaken, with station cleanup and debris disposal carried out in a manner acceptable to environmental authorities. Reservoir spillage was necessitated by the station shutdown. The spill recreated fish habitat in the spillway and walleye spawning were documented. A compensation program was developed to respond to problems caused by debris flushed from the spillway channel. On spill termination, a fish salvage program removed fish from a scour hole in the spillway channel. A proactive program of public information provided local residents with the facts about the incident and response program, and allayed concerns about public safety. 4 refs., 2 figs

  13. Evaluation of the Vehicle Out-of-Commission Standard for Air Force Vehicle Maintenance Units.

    Science.gov (United States)

    1995-09-01

    been reduced, true performance of the unit has decreased. A study conducted by The Maryland Center for Productivity and Quality of Worklife in 1981...productivity indicators using criteria established by The Maryland Center for Productivity and Quality of Worklife study in 1981. The first conclusion was that...Results," Public Productivity and Management Review. 16: 395-402 (Summer 1993). Kaplan, Robert S. "Implementing the Balanced Scorecard at FMC

  14. Production and postharvest quality maintenance of single unit and bunching broccoli in Virginia

    OpenAIRE

    Jett, Lewis W.

    1990-01-01

    Broccoli (Brassica oleracea L. var. italica) has become an increasingly popular vegetable with American consumers. Much of the attractiveness of fresh broccoli is derived from this vegetable's high nutrition and excellent organoleptic properties. In a consumer response survey, Virginia Master Gardeners indicated a preference for broccoli that has less stalk and more florets by weight. The objectives of this research were to produce single unit broccoli, and to examine vac...

  15. The carbon footprints of home and in-center maintenance hemodialysis in the United Kingdom.

    Science.gov (United States)

    Connor, Andrew; Lillywhite, Robert; Cooke, Matthew W

    2011-01-01

    Climate change presents a global health threat. However, the provision of healthcare, including dialysis, is associated with greenhouse gas emissions. The aim of this study was to determine the carbon footprints of the differing modalities and treatment regimes used to deliver maintenance hemodialysis (HD), in order to inform carbon reduction strategies at the level of both individual treatments and HD programs. This was a component analysis study adhering to PAS2050. Emissions factors were applied to data that were collected for building energy use, travel and procurement. Thrice weekly in-center HD has a carbon footprint of 3.8 ton CO2 Eq per patient per year. The majority of emissions arise within the medical equipment (37%), energy use (21%), and patient travel (20%) sectors. The carbon footprint of providing home HD varies with the regime. For standard machines: 4 times weekly (4 days, 4.5 hours), 4.3 ton CO2 Eq; 5 times weekly (5 days, 4 hours), 5.1 ton CO2 Eq ; short daily (6 days, 2 hours), 5.2 ton CO2 Eq; nocturnal (3 nightly, 7 hours), 3.9 ton CO2 Eq; and nocturnal (6 nightly, 7 hours), 7.2 ton CO2 Eq. For NxStage equipment: short daily (5.5 days, 3 hours), 1.8 ton CO2 Eq; 6 nightly nocturnal (2.1 ton CO2 Eq). The carbon footprint of HD is influenced more by the frequency of treatments than by their duration. The anticipated rise in the prevalence of home HD patients, dialyzing more frequently and for longer than in-center patients, will increase the emissions associated with HD programs (despite reductions in patient travel emissions). Emerging technologies, such as NxStage, might offer a solution to this problem. © 2011 The Authors. Hemodialysis International © 2011 International Society for Hemodialysis.

  16. Piping failures in United States nuclear power plants 1961-1995

    International Nuclear Information System (INIS)

    Bush, S.H.; Do, M.J.; Slavich, A.L.; Chockie, A.D.

    1996-01-01

    Over 1500 reported piping failures were identified and summarized based on an extensive review of tens of thousands of event reports that have been submitted to the US regulatory agencies over the last 35 years. The data base contains only piping failures; failures in vessels, pumps, valves and steam generators or any cracks that were not through-wall are not included. It was observed that there has been a marked decrease in the number of failures after 1983 for almost all sizes of pipes. This is likely due to the changes in the reporting requirements at that time and the corrective actions taken by utilities to minimize fatigue failures of small lines and IGSCC in BWRs. One failure mechanism that continues to occur is erosion-corrosion, which accounts for most of the ruptures reported and probably is responsible for the absence of downward trends in ruptures. Fatigue-vibration is also a significant contributor to piping failures. However, most of such events occur in lines approx. one inch or less in diameter. Together, erosion-corrosion and fatigue-vibration account for over 43 per cent of the failures. The overwhelming majority of failures have been leaks, over half the failures occurred in pipes with a diameter of one inch or less. Included in the report is a listing of the number of welds in various systems in LWRs

  17. Parameter Estimation of a Reliability Model of Demand-Caused and Standby-Related Failures of Safety Components Exposed to Degradation by Demand Stress and Ageing That Undergo Imperfect Maintenance

    Directory of Open Access Journals (Sweden)

    S. Martorell

    2017-01-01

    Full Text Available One can find many reliability, availability, and maintainability (RAM models proposed in the literature. However, such models become more complex day after day, as there is an attempt to capture equipment performance in a more realistic way, such as, explicitly addressing the effect of component ageing and degradation, surveillance activities, and corrective and preventive maintenance policies. Then, there is a need to fit the best model to real data by estimating the model parameters using an appropriate tool. This problem is not easy to solve in some cases since the number of parameters is large and the available data is scarce. This paper considers two main failure models commonly adopted to represent the probability of failure on demand (PFD of safety equipment: (1 by demand-caused and (2 standby-related failures. It proposes a maximum likelihood estimation (MLE approach for parameter estimation of a reliability model of demand-caused and standby-related failures of safety components exposed to degradation by demand stress and ageing that undergo imperfect maintenance. The case study considers real failure, test, and maintenance data for a typical motor-operated valve in a nuclear power plant. The results of the parameters estimation and the adoption of the best model are discussed.

  18. 20 CFR 404.450 - Required reports of work outside the United States or failure to have care of a child.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Required reports of work outside the United States or failure to have care of a child. 404.450 Section 404.450 Employees' Benefits SOCIAL SECURITY... Nonpayments of Benefits § 404.450 Required reports of work outside the United States or failure to have care...

  19. Determination of the bone-mineral content of the peripheral skeleton (ulna and calcaneus) in chronic renal failure patients on maintenance dialysis using 125 I-photon absorptiometry

    International Nuclear Information System (INIS)

    Hieber, U.

    1982-01-01

    The bone-mineral content (BMC) of the peripheral skeleton was measured in 53 chronic renal-failure patients on maintenance dialysis using the 125 I photon absorptiometry according to Cameron. 39.6% of the patients were found to have a clearly pathological calcium content in calcaneus and ulna (33%). In total BMC assessments 43.4% of the patients examined showed strongly reduced BMC values at two measurement sites at least. Average bone-mineral content was below the value of the corresponding normal groups in all age groups of the dialysis patients. In addition, a significant correlation was verified to exist between the calcium contents of calcaneus and ulna. A significant correlation was found as well between reduced BMC values and dialysis duration. The correlation between the increased serum level of alkaline phosphatase and the reduced mineral content of the skeleton was significant as well. A minor but not significant correlation existed between the increase of the parathormone (PTH) level in the serum and the decrease of calcium content in calcaneus and ulna. A good correlation was found when contrasting the results of visual roentgenography and the BMC values established by photodensitometry: the median BMC value of patients with clear pathological X-ray findings was significantly below the one of patients without pathological X-ray findings. However, photon absorptiometry is superior to the subjective evaluation of X-ray pictures in the early diagnosis of bone diseases involving bone-mineral loss. (orig.) [de

  20. Clinical risk analysis with failure mode and effect analysis (FMEA) model in a dialysis unit.

    Science.gov (United States)

    Bonfant, Giovanna; Belfanti, Pietro; Paternoster, Giuseppe; Gabrielli, Danila; Gaiter, Alberto M; Manes, Massimo; Molino, Andrea; Pellu, Valentina; Ponzetti, Clemente; Farina, Massimo; Nebiolo, Pier E

    2010-01-01

    The aim of clinical risk management is to improve the quality of care provided by health care organizations and to assure patients' safety. Failure mode and effect analysis (FMEA) is a tool employed for clinical risk reduction. We applied FMEA to chronic hemodialysis outpatients. FMEA steps: (i) process study: we recorded phases and activities. (ii) Hazard analysis: we listed activity-related failure modes and their effects; described control measures; assigned severity, occurrence and detection scores for each failure mode and calculated the risk priority numbers (RPNs) by multiplying the 3 scores. Total RPN is calculated by adding single failure mode RPN. (iii) Planning: we performed a RPNs prioritization on a priority matrix taking into account the 3 scores, and we analyzed failure modes causes, made recommendations and planned new control measures. (iv) Monitoring: after failure mode elimination or reduction, we compared the resulting RPN with the previous one. Our failure modes with the highest RPN came from communication and organization problems. Two tools have been created to ameliorate information flow: "dialysis agenda" software and nursing datasheets. We scheduled nephrological examinations, and we changed both medical and nursing organization. Total RPN value decreased from 892 to 815 (8.6%) after reorganization. Employing FMEA, we worked on a few critical activities, and we reduced patients' clinical risk. A priority matrix also takes into account the weight of the control measures: we believe this evaluation is quick, because of simple priority selection, and that it decreases action times.

  1. Universal failure model for multi-unit systems with shared functionality

    International Nuclear Information System (INIS)

    Volovoi, Vitali

    2013-01-01

    A Universal Failure Model (UFM) is proposed for complex systems that rely on a large number of entities for performing a common function. Economy of scale or other considerations may dictate the need to pool resources for common purpose, but the resulting strong coupling precludes the grouping of those components into modules. Existing system-level failure models rely on modularity for reducing modeling complexity, so the UFM will fill an important gap in constructing efficient system-level models. Conceptually, the UFM resembles cellular automata (CA) infused with realistic failure mechanisms. Components’ behavior is determined based on the balance between their strength (capacity) and their load (demand) share. If the load exceeds the components’ capacity, the component fails and its load share is distributed among its neighbors (possibly with a time delay and load losses). The strength of components can degrade with time if the load exceeds an elastic threshold. The global load (demand) carried by the system can vary over time, with the peak values providing shocks to the system (e.g., wind loads in civil structures, electricity demand, stressful activities to human bodies, or drought in an ecosystem). Unlike the models traditionally studied by CA, the focus of the presented model is on the system reliability, and specifically on the study of time-to-failure distributions, rather than steady-state patterns and average time-to-failure characteristics. In this context, the relationships between the types of failure distributions and the parameters of the failure model are discussed

  2. Favorable bed utilization and readmission rates for emergency department observation unit heart failure patients.

    Science.gov (United States)

    Schrager, Justin; Wheatley, Matthew; Georgiopoulou, Vasiliki; Osborne, Anwar; Kalogeropoulos, Andreas; Hung, Olivia; Butler, Javed; Ross, Michael

    2013-06-01

    The objective was to compare readmission rates and hospital bed-days between acute decompensated heart failure (AHF) patients admitted or discharged following accelerated treatment protocol (ATP)-driven care in an emergency department observation unit (OU). This was a retrospective cohort study conducted at two urban university-affiliated hospitals. A total of 358 selected AHF patients received treatment on an ATP in the OU between October 1, 2007, and June 30, 2011. The comparison of interest was admission or discharge following OU treatment. The outcome of interest was readmission within 30 and 90 days of hospital discharge following care in the OU. We also examined resource use (inpatient, inpatient plus outpatient-days) between the admitted and discharged groups. Time to readmission analysis was performed with Cox proportional hazards regression. Discharged and admitted patients were similar with respect to age, race, sex, ED length of stay (LOS), and OU LOS. Patients admitted from the OU had a higher median B-type natriuretic peptide (BNP; 1,063 pg/mL [interquartile range {IQR} = 552 to 2,067 pg/mL] vs. 708 pg/mL [IQR = 254 to 1,683 pg/mL]; p = 0.002) and blood urea nitrogen (BUN; 19 mg/dL [IQR = 14 to 26 mg/dL] vs. 17 mg/dL [IQR = 13 to 23 mg/dL]) than those discharged (p = 0.04) and a lower median ejection fraction (EF; 22.5% [15% to 43%] vs. 35% [IQR 20% to 55%]; p = 0.002). In models controlling for age, race, sex, clinical site, BNP, BUN, creatinine, and EF, the 30-day readmission rate (13.8% in the study population as a whole) was not significantly different between the patients discharged or admitted following OU care (hazard ratio [HR] = 0.99; 95% confidence interval [CI] = 0.47 to 2.10). The readmission rates were also not significantly different at 90 days (HR = 1.07; 95% CI = 0.65 to 1.77). Within 30 days of discharge from the OU, patients spent a median of 1.7 days (IQR = 0.0 to 5.1 days) as inpatients, compared to 3.5 days (IQR = 2.3 to 5.8 days

  3. Geriatric Inpatient Units in the Care of Hospitalized Frail Adults with a History of Heart Failure

    Directory of Open Access Journals (Sweden)

    Shahyar Michael Gharacholou

    2012-06-01

    Conclusion: Inpatient GEM was associated with better maintenance of physical function and basic ADLs at hospital discharge; however, no differences in HRQOL or survival were observed between GEM and UC at 1 year post randomization. Restructuring inpatient care models to incorporate inpatient GEM principles may be one method to optimize health-care delivery.

  4. The use and effectiveness of rituximab maintenance in patients with follicular lymphoma diagnosed between 2004 and 2007 in the United States.

    Science.gov (United States)

    Nastoupil, Loretta J; Sinha, Rajni; Byrtek, Michelle; Zhou, Xiaolei; Taylor, Michael D; Friedberg, Jonathan W; Link, Brian K; Cerhan, James R; Dawson, Keith; Flowers, Christopher R

    2014-06-15

    The authors examined the "real-world" effectiveness of rituximab (R) maintenance therapy (R-maintenance) compared with observation after R-based induction therapy in patients with previously untreated follicular lymphoma (FL) in the United States. The National LymphoCare Study is a prospective, multicenter, observational study that enrolled > 2700 untreated patients with FL diagnosed from 2004 to 2007 at 265 sites in the United States. Among these, patients who achieved at least stable disease after R-based induction therapy were eligible for the current analysis. Patients who initiated R-maintenance within 215 days of completing induction therapy were categorized as the R-maintenance group, and those who did not initiate therapy during this period were categorized as the observation group. The objective of the current study was to determine the effect of R-maintenance on progression-free survival (PFS), time to next treatment (TTNT), and overall survival (OS). A total of 1439 patients completed R-based induction therapy, 1186 of whom met all inclusion criteria (541 patients received R-maintenance and 645 patients were observed). Characteristics that were found to be predictive of receiving R-maintenance were histology grade (1/2), Ann Arbor stage of disease (III/IV), geographic region (region other than the West), and practice setting (community practice). With a median follow-up of 5.7 years, R-maintenance was associated with superior PFS (hazards ratio [HR], 0.68; 95% confidence interval [95% CI], 0.56-0.84 [P = .0003]) and TTNT (HR, 0.66; 95% CI, 0.52-0.84 [P = .0007]). No significant difference in OS was observed (HR, 0.81; 95% CI, 0.58-1.14 [P = .23]). R-maintenance in patients with FL and at least stable disease after R-based induction therapy provided significantly longer PFS and TTNT in comparison with observation, but no significant difference in OS was observed with 5-years of follow-up. This comparative effectiveness study aligns with

  5. Reliability centered maintenance streamlining through lessons learned

    International Nuclear Information System (INIS)

    Strong, D.K.

    1991-01-01

    In late 1986, PSE and G concluded that the Nuclear Department would develop a consistent approach to maintenance at Artificial Island (Salem and Hope Creak nuclear units). Preventive maintenance (PM) would be the heart of this approach. In the last six months of 1987 departments affected by the maintenance program participated on working groups that developed the Artificial Island maintenance philosophy. The central theme of the maintenance philosophy is the RCM (reliability centered maintenance) process. A pilot project tested the process in 1988. In 1989 the Central PM Group formed and in 1990 was given responsibility and authority to analyze, approve, implement, and control PM program changes. RCM is the central theme of the PM improvement effort but not the whole effort. Other important pieces included in this paper are: development of a common PM program, improvement of work instructions, development of predictive maintenance techniques into programs, development of a PM basis database, development of PM feedback from failure trends, root cause analysis, maintenance performance indicators, technicians, and engineers

  6. Regulatory analysis for the resolution of Generic Issue 130: Essential service water system failures at multi-unit sites

    International Nuclear Information System (INIS)

    Leung, V.; Basdekas, D.; Mazetis, G.

    1991-06-01

    The essential service water system (ESWS) is required to provide cooling in nuclear power plants during normal operation and accident conditions. The ESWS typically supports component cooling water heat exchangers, containment spray heat exchangers, high-pressure injection pump oil coolers, emergency diesel generators, and auxiliary building ventilation coolers. Failure of the ESWS function could lead to severe consequences. This report presents the regulatory analysis for GI-130, ''Essential Service Water System Failures at Multi-Unit Sites.'' The risk reduction estimates, cost/benefit analyses, and other insights gained during this effort have shown that implementation of the recommendations will significantly reduce risk and that these improvements are warranted in accordance with the backfit rule, 10 CFR 50.109(a)(3). 19 refs., 16 tabs

  7. Efforts to Reduce International Space Station Crew Maintenance for the Management of the Extravehicular Mobility Unit Transport Loop Water Quality

    Science.gov (United States)

    Steele, John W.; Etter, David; Rector, Tony; Boyle, Robert; Vandezande, Christopher

    2013-01-01

    The EMU (Extravehicular Mobility Unit) contains a semi-closed-loop re-circulating water circuit (Transport Loop) to absorb heat into a LCVG (Liquid Coolant and Ventilation Garment) worn by the astronaut. A second, single-pass water circuit (Feed-water Loop) provides water to a cooling device (Sublimator) containing porous plates, and that water sublimates through the porous plates to space vacuum. The cooling effect from the sublimation of this water translates to a cooling of the LCVG water that circulates through the Sublimator. The quality of the EMU Transport Loop water is maintained through the use of a water processing kit (ALCLR Airlock Cooling Loop Remediation) that is used to periodically clean and disinfect the water circuit. Opportunities to reduce crew time associated with on-orbit ALCLR operations include a detailed review of the historical water quality data for evidence to support an extension to the implementation cycle. Furthermore, an EMU returned after 2-years of use on the ISS (International Space Station) is being used as a test bed to evaluate the results of extended and repeated ALCLR implementation cycles. Finally, design, use and on-orbit location enhancements to the ALCLR kit components are being considered to allow the implementation cycle to occur in parallel with other EMU maintenance and check-out activities, and to extend the life of the ALCLR kit components. These efforts are undertaken to reduce the crew-time and logistics burdens for the EMU, while ensuring the long-term health of the EMU water circuits for a post-Shuttle 6-year service life.

  8. Application of failure mode and effect analysis in managing catheter-related blood stream infection in intensive care unit.

    Science.gov (United States)

    Li, Xixi; He, Mei; Wang, Haiyan

    2017-12-01

    In this study, failure mode and effect analysis (FMEA), a proactive tool, was applied to reduce errors associated with the process which begins with assessment of patient and ends with treatment of complications. The aim of this study is to assess whether FMEA implementation will significantly reduce the incidence of catheter-related bloodstream infections (CRBSIs) in intensive care unit.The FMEA team was constructed. A team of 15 medical staff from different departments were recruited and trained. Their main responsibility was to analyze and score all possible processes of central venous catheterization failures. Failure modes with risk priority number (RPN) ≥100 (top 10 RPN scores) were deemed as high-priority-risks, meaning that they needed immediate corrective action. After modifications were put, the resulting RPN was compared with the previous one. A centralized nursing care system was designed.A total of 25 failure modes were identified. High-priority risks were "Unqualified medical device sterilization" (RPN, 337), "leukopenia, very low immunity" (RPN, 222), and "Poor hand hygiene Basic diseases" (RPN, 160). The corrective measures that we took allowed a decrease in the RPNs, especially for the high-priority risks. The maximum reduction was approximately 80%, as observed for the failure mode "Not creating the maximal barrier for patient." The averaged incidence of CRBSIs was reduced from 5.19% to 1.45%, with 3 months of 0 infection rate.The FMEA can effectively reduce incidence of CRBSIs, improve the security of central venous catheterization technology, decrease overall medical expenses, and improve nursing quality. Copyright © 2017 The Authors. Published by Wolters Kluwer Health, Inc. All rights reserved.

  9. Technical evaluation report on the seven main transformer failures at the North Anna Power Station, Units 1 and 2 (Docket Nos. 50-338, 50-339)

    International Nuclear Information System (INIS)

    Dalton, K.J.; Kresser, J.V.; Savage, J.W.; Selan, J.C.

    1984-01-01

    This report documents technical evaluations on various aspects pertaining to the seven main transformer failures at the North Anna Power Station, Units 1 and 2. These reports cover the subjects of Probability Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Root Causes, Protection Systems, Modifications, Failure Statistics, and Generic Aspects. The PRA determined that the contribution from a main transformer failure affecting plant safety systems so as to increase the risk to the public health and safety is negligible. The FMEA determined that a main transformer failure can have primary and secondary effects on plant safety system operation. The evaluation of the Root Causes found that no single common cause contributed to the seven failures. Each failure was found to have specific circumstances for initiating the failure. Both the generator and transformer primary protection systems were found to perform correctly and were designed within industry standards and practices. The proposed modifications resulting from the analyses of the failures will improve system reliability and integrity, and will reduce potentially damaging effects. The failure statistic survey found very limited data bases from which a meaningful correlation could be ascertained. The statistical comparison found no appreciable anomalies with the NAPS failures. The evaluation of all the available information and the results of the separate reports on the main transformer failures found that several generic concerns exist

  10. Maintenance optimization of the Ignalina NPP safety systems

    International Nuclear Information System (INIS)

    Zuokas, D.; Augutis, J.

    2000-01-01

    This paper represents some theses and mathematical approach to optimization of technical specification problems of the diesel generators system (DGS) at the Ignalina NPP (INPP) in Lithuania. Analysis unites three chapters, each attributed to the solving of related problems: dependency of the Core Damage Frequency (CDF) on DGS test interval (Chapter 2), analysis and comparison of two different maintenance strategies for DGS (Chapter 3), DGS test interval's optimisation (averaged loss function minimisation) taking into consideration maintenance and DGS failure's consequence costs (Chapter 4). The mathematical model was developed which lets to estimate DGS failure probability, the averaged loss function value and study the influence of different parameters into final results. (author)

  11. Failure in Success; An Assessment of Agricultural Extension in the United States.

    Science.gov (United States)

    Carlson, Robert A.

    The United States formalized its cooperative national support program for agricultural extension in 1941. The hope was to increase agricultural production and to help maintain a rural way of life in the United States. The Cooperative Extension Service was unable to strike a balance between these two goals, emphasizing increased production to such…

  12. The application and practice of predictive maintenance at CANDU equipment management

    International Nuclear Information System (INIS)

    Yu Guangting

    2014-01-01

    The equipment in Qinshan CANDU unit is characterized by large number and complex structure. Some equipment failure has no relation with the operation time, it is impossible to avoid the failure of these equipment only by periodical maintenance. To improve the equipment reliability, increase the equipment usability and decrease the maintenance cost, for important equipment related to nuclear safety and generating electricity, it is required to perform condition monitoring and the predictive maintenance (PdM). According to different characteristics of equipment, it is required to use suitable equipment condition monitoring method, content and frequency. In this way, some potential equipment failure can be found, preventive maintenance can be arranged in advance, and equipment maintenance management can be optimized. (author)

  13. Operation and maintenance manual for the temporary septic holding tank at the 100-D remedial action support facility. Revision 2

    International Nuclear Information System (INIS)

    Kelty, G.G.

    1996-10-01

    This manual was prepared to provide detailed information for the operation and maintenance of the sanitary wastewater holding system at the 100-D Remedial Action Support Facility located in the 100-DR-1 Operable Unit at the Hanford Site. This document describes operations, including the type and frequency of required maintenance, and system failure response procedures

  14. Operation and maintenance manual for the temporary septic holding tank at the 100-D remedial action support facility. Revision 1

    International Nuclear Information System (INIS)

    Kelty, G.G.

    1996-09-01

    This manual provides detailed information for the operation and maintenance of the sanitary wastewater holding system at the 100-D Remedial Action Support Facility located in the 100-DR-1 Operable Unit of the Hanford Site. This document describes operations, including the type and frequency of required maintenance, and system failure response procedures

  15. Positive predictive value and impact of misdiagnosis of a heart failure diagnosis in administrative registers among patients admitted to a University Hospital cardiac care unit

    DEFF Research Database (Denmark)

    Mard, Shan; Nielsen, Finn Erland

    2010-01-01

    To evaluate the positive predictive value (PPV) of a diagnosis of heart failure (HF) in the Danish National Registry of Patients (NRP) among patients admitted to a University Hospital cardiac care unit, and to evaluate the impact of misdiagnosing HF.......To evaluate the positive predictive value (PPV) of a diagnosis of heart failure (HF) in the Danish National Registry of Patients (NRP) among patients admitted to a University Hospital cardiac care unit, and to evaluate the impact of misdiagnosing HF....

  16. Cold War Agency: The United States and the Failure of the DIEM Experiment

    Science.gov (United States)

    2017-03-01

    the United States by complying with Western norms of democratic leadership , only later developing into an autocratic tyrant; or was Diem’s...2000s to establish democratic regimes in Afghanistan and Iraq reflect an American foreign policy tradition that began at the end of World War II. The...would eventually serve in Vietnam in a failed effort to prevent the Democratic Republic of Vietnam from uniting the country under a communist regime

  17. Success/Failure Prediction of Noninvasive Mechanical Ventilation in Intensive Care Units. Using Multiclassifiers and Feature Selection Methods.

    Science.gov (United States)

    Martín-González, Félix; González-Robledo, Javier; Sánchez-Hernández, Fernando; Moreno-García, María N

    2016-05-17

    This paper addresses the problem of decision-making in relation to the administration of noninvasive mechanical ventilation (NIMV) in intensive care units. Data mining methods were employed to find out the factors influencing the success/failure of NIMV and to predict its results in future patients. These artificial intelligence-based methods have not been applied in this field in spite of the good results obtained in other medical areas. Feature selection methods provided the most influential variables in the success/failure of NIMV, such as NIMV hours, PaCO2 at the start, PaO2 / FiO2 ratio at the start, hematocrit at the start or PaO2 / FiO2 ratio after two hours. These methods were also used in the preprocessing step with the aim of improving the results of the classifiers. The algorithms provided the best results when the dataset used as input was the one containing the attributes selected with the CFS method. Data mining methods can be successfully applied to determine the most influential factors in the success/failure of NIMV and also to predict NIMV results in future patients. The results provided by classifiers can be improved by preprocessing the data with feature selection techniques.

  18. Meteorological Satellites (METSAT) and Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL)

    Science.gov (United States)

    1996-01-01

    This Failure Modes and Effects Analysis (FMEA) is for the Advanced Microwave Sounding Unit-A (AMSU-A) instruments that are being designed and manufactured for the Meteorological Satellites Project (METSAT) and the Earth Observing System (EOS) integrated programs. The FMEA analyzes the design of the METSAT and EOS instruments as they currently exist. This FMEA is intended to identify METSAT and EOS failure modes and their effect on spacecraft-instrument and instrument-component interfaces. The prime objective of this FMEA is to identify potential catastrophic and critical failures so that susceptibility to the failures and their effects can be eliminated from the METSAT/EOS instruments.

  19. Insomnia Self-Management in Heart Failure

    Science.gov (United States)

    2018-01-05

    Cardiac Failure; Heart Failure; Congestive Heart Failure; Heart Failure, Congestive; Sleep Initiation and Maintenance Disorders; Chronic Insomnia; Disorders of Initiating and Maintaining Sleep; Fatigue; Pain; Depressive Symptoms; Sleep Disorders; Anxiety

  20. Performance-based maintenance of gas turbines for reliable control of degraded power systems

    Science.gov (United States)

    Mo, Huadong; Sansavini, Giovanni; Xie, Min

    2018-03-01

    Maintenance actions are necessary for ensuring proper operations of control systems under component degradation. However, current condition-based maintenance (CBM) models based on component health indices are not suitable for degraded control systems. Indeed, failures of control systems are only determined by the controller outputs, and the feedback mechanism compensates the control performance loss caused by the component deterioration. Thus, control systems may still operate normally even if the component health indices exceed failure thresholds. This work investigates the CBM model of control systems and employs the reduced control performance as a direct degradation measure for deciding maintenance activities. The reduced control performance depends on the underlying component degradation modelled as a Wiener process and the feedback mechanism. To this aim, the controller features are quantified by developing a dynamic and stochastic control block diagram-based simulation model, consisting of the degraded components and the control mechanism. At each inspection, the system receives a maintenance action if the control performance deterioration exceeds its preventive-maintenance or failure thresholds. Inspired by realistic cases, the component degradation model considers random start time and unit-to-unit variability. The cost analysis of maintenance model is conducted via Monte Carlo simulation. Optimal maintenance strategies are investigated to minimize the expected maintenance costs, which is a direct consequence of the control performance. The proposed framework is able to design preventive maintenance actions on a gas power plant, to ensuring required load frequency control performance against a sudden load increase. The optimization results identify the trade-off between system downtime and maintenance costs as a function of preventive maintenance thresholds and inspection frequency. Finally, the control performance-based maintenance model can reduce

  1. Persistence and failure of mean-field approximations adapted to a class of systems of delay-coupled excitable units

    Science.gov (United States)

    Franović, Igor; Todorović, Kristina; Vasović, Nebojša; Burić, Nikola

    2014-02-01

    We consider the approximations behind the typical mean-field model derived for a class of systems made up of type II excitable units influenced by noise and coupling delays. The formulation of the two approximations, referred to as the Gaussian and the quasi-independence approximation, as well as the fashion in which their validity is verified, are adapted to reflect the essential properties of the underlying system. It is demonstrated that the failure of the mean-field model associated with the breakdown of the quasi-independence approximation can be predicted by the noise-induced bistability in the dynamics of the mean-field system. As for the Gaussian approximation, its violation is related to the increase of noise intensity, but the actual condition for failure can be cast in qualitative, rather than quantitative terms. We also discuss how the fulfillment of the mean-field approximations affects the statistics of the first return times for the local and global variables, further exploring the link between the fulfillment of the quasi-independence approximation and certain forms of synchronization between the individual units.

  2. Perencanaan Kegiatan Maintenance Dengan Metode Reability Centered Maintenance (Rcm) II

    OpenAIRE

    Rachmad Hidayat; Nachnul Ansori; Ali Imron

    2010-01-01

    Maintenance Activity Planning by Reability Centered Maintenance (RCM) II Method. This research discussmaintenance activity by using RCM II method to determine failure function risk at compresor screw. Calculation isgiven to magnitude optimum time maintenance interval by considering the cost maintenance and the cost reparation.From the research results with RPN points out that critical component that needs to get main priority in givemaintenance on compresor screw are bust logistic on timeworn...

  3. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  4. Dependence of the mean time to failure of a hydraulic balancing machine unit on different factors for sectional pumps of the Alrosa JSC

    Science.gov (United States)

    Ovchinnikov, N. P.; Portnyagina, V. V.; Sobakina, M. P.

    2017-12-01

    This paper presents factors that have a greater impact on the mean time to failure of a hydraulic balancing machine unit working in underground kimberlite mines of the Alrosa JSC, the hydraulic balancing machine unit being the least reliable structural elements in terms of error-free operation. In addition, a multifactor linear dependence of mean time to failure of a hydraulic balancing machine unit is shown regarding it being parts of stage sectional pumps in the underground kimberlite mines of the Alrosa JSC. In prospect, this diagram can allow us to predict the durability of the least reliable structural element of a sectional pump.

  5. Failure mode, effect and criticality analysis (FMECA) on mechanical subsystems of diesel generator at NPP

    International Nuclear Information System (INIS)

    Kim, Tae Woon; Singh, Brijendra; Sung, Tae Yong; Park, Jin Hee; Lee, Yoon Hwan

    1996-06-01

    Largely, the RCM approach can be divided in three phases; (1) Functional failure analysis (FFA) on the selected system or subsystem, (2) Failure mode, effect and criticality analysis (FMECA) to identify the impact of failure to plant safety or economics, (3) Logical tree analysis (LTA) to select appropriate preventive maintenance and surveillance tasks. This report presents FMECA results for six mechanical subsystems of the diesel generators of nuclear power plants. The six mechanical subsystems are Starting air, Lub oil, Governor, Jacket water cooling, Fuel, and Engine subsystems. Generic and plant-specific failure and maintenance records are reviewed to identify critical components/failure modes. FMECA was performed for these critical component/failure modes. After reviewing current preventive maintenance activities of Wolsung unit 1, draft RCM recommendations are developed. 6 tabs., 16 refs. (Author)

  6. Failure mode, effect and criticality analysis (FMECA) on mechanical subsystems of diesel generator at NPP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Woon; Singh, Brijendra; Sung, Tae Yong; Park, Jin Hee; Lee, Yoon Hwan [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-06-01

    Largely, the RCM approach can be divided in three phases; (1) Functional failure analysis (FFA) on the selected system or subsystem, (2) Failure mode, effect and criticality analysis (FMECA) to identify the impact of failure to plant safety or economics, (3) Logical tree analysis (LTA) to select appropriate preventive maintenance and surveillance tasks. This report presents FMECA results for six mechanical subsystems of the diesel generators of nuclear power plants. The six mechanical subsystems are Starting air, Lub oil, Governor, Jacket water cooling, Fuel, and Engine subsystems. Generic and plant-specific failure and maintenance records are reviewed to identify critical components/failure modes. FMECA was performed for these critical component/failure modes. After reviewing current preventive maintenance activities of Wolsung unit 1, draft RCM recommendations are developed. 6 tabs., 16 refs. (Author).

  7. 原料气压缩机组检修技术总结%Technical summary of maintenance of air compressor unit

    Institute of Scientific and Technical Information of China (English)

    罗伟雄; 符和穗

    2015-01-01

    the raw material pressure reducing unit is the synthetic equipment of 800000 t chemical fertilizer plant in Hainan base of CNOOC chemical Limited by Share Ltd.Since the commissioning of the equipment maintenance tasks have been outside the Commission other chemical inspection unit is responsible for the overhaul of the equipment in 2015 the first time by the company to bear,I encountered in the process of maintenance problems and treatment measures to express, for maintenance or technical personnel to provide reference.%原料气压缩机组为中海油化学股份有限公司海南基地80万 t 化肥装置合成设备。自投产以来该设备的维修任务一直都外委其他化工检修单位负责,2015年该设备的大修首次由本公司独自承担,本人就检修过程中遇到的问题及处理措施进行表述,为检修或技术人员提供参考。

  8. Copenhagen failure : a rhetorical treatise of how speeches unite and divide mankind

    OpenAIRE

    Kortetmäki, Teea

    2010-01-01

    The purpose of this treatise is to analyse five of the Copenhagen Climate Convention's main speeches to see how they supported or weakened the agreement possibilities in the convention. Particular focus will be on the elements that divide or unite negotiators and whether the summit's failing outcome is already built in the pre-planned speeches held at the main podium. Theoretically, the study builds on Kenneth Burke's identification thesis and Elizabeth L. Malone's climate change debate an...

  9. The United States Government Interagency Process and the Failure of Institution Building in Iraq

    Science.gov (United States)

    2008-06-12

    warehouses they were amazed to find pallets and pallets full of medical equipment from floor to ceiling that had had been in the warehouses for some... glass broken; and books and documents strewn about?”27 24 Durch, William ed. “Twenty-First-Century Peace Operations.” United States Institute of...health) to actors that potentially threaten domestic or international order (e.g., Egypt, Palestinian Authority, Lebanon ) Exploitation of legal

  10. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  11. Environmental risk assessment of low density polyethylene unit using the method of failure mode and effect analysis

    Directory of Open Access Journals (Sweden)

    Salati Parinaz

    2012-01-01

    Full Text Available The ninth olefin plan of Arya Sasol Petrochemical Company (A.S.P.C. is regarded the largest gas Olefin Unit located on Pars Special Economic Energy Zone (P.S.E.E.Z. Considering the importance of the petrochemical unit, its environmental assessment seems necessary to identify and reduce potential hazards. For this purpose, after determining the scope of the study area, identification and measurement of the environmental parameters, environmental risk assessment of the unit was carried out using Environment Failure Mode and Effect Analysis (EFMEA. Using the noted method, sources causing environmental risks were identified, rated and prioritized. Beside, the impacts of the environmental aspects derived from the unit activities as well as their consequences were also analyzed. Furthermore, the identified impacts were prioritized based on Risk Priority Number (RPN and severity level of the consequences imposed on the affected environment. After performing statistical calculations, it was found that the environmental aspects owing the risk priority number higher than 15 have a high level of risk. Results obtained from Low Density Polyethylene Unit revealed that the highest risk belongs to the emergency vent system with risk priority number equal to 48. It is occurred due to imperfect performance of the reactor safety system leading to the emissions of ethylene gas, particles, and radioactive steam as well as air and noise pollutions. Results derived from secondary assessment of the environmental aspects, through difference in calculated RPN and activities risk levels showed that employing modern methods and risk assessment are have remarkably reduced the severity of risk and consequently detracted the damages and losses incurred on the environment.

  12. Milrinone in advanced heart failure: dose and therapeutic monitor outside intensive care unit.

    Science.gov (United States)

    Charisopoulou, Dafni; Leaver, Neil; Banner, Nicholas R

    2014-04-01

    Advanced chronic heart failure (ACHF) patients often require inotropes before transplantation or ventricular assist device implantation. Milrinone, an inotrope and vasodilator, may accumulate in cardiorenal syndrome with serious adverse effects. We investigated the potential for therapeutic drug monitoring of milrinone levels using High Performance Liquid Chromatography Mass Spectrometry (HPLC-MS). 22 ACHF patients (15 males, 49±9 years) received milrinone 50 µg/kg intravenously (i.v.) during heart catheterization. Milrinone levels were 216±71 ng/ml (within the reported therapeutic range: 100-300 ng/ml), followed by improvements in cardiac index, pulmonary artery and wedge pressures (p milrinone (5-26 days) at 0.1-0.2 µg/kg/min, titrated according to plasma milrinone levels. No adverse events occurred. Therapeutic levels were achieved with doses of 0.2±0.06 µg/Kg/min, below those recommended in Summary of Product Characteristics. Milrinone therapy can be noninvasively monitored by HPLC-MS, while avoiding toxicity in ACHF.

  13. Optimizing Management of Heart Failure by Using Echo and Natriuretic Peptides in the Outpatient Unit.

    Science.gov (United States)

    Dini, Frank Lloyd; Bajraktari, Gani; Zara, Cornelia; Mumoli, Nicola; Rosa, Gian Marco

    2018-01-28

    Chronic heart failure (HF) is an important public health problem and is associated with high morbidity, high mortality, and considerable healthcare costs. More than 90% of hospitalizations due to worsening HF result from elevations of left ventricular (LV) filling pressures and fluid overload, which are often accompanied by the increased synthesis and secretion of natriuretic peptides (NPs). Furthermore, persistently abnormal LV filling pressures and a rise in NP circulating levels are well known indicators of poor prognosis. Frequent office visits with the resulting evaluation and management are most often needed. The growing pressure from hospital readmissions in HF patients is shifting the focus of interest from traditionally symptom-guided care to a more specific patient-centered follow-up care based on clinical findings, BNP and echo. Recent studies supported the value of serial NP measurements and Doppler echocardiographic biomarkers of elevated LV filling pressures as tools to scrutinize patients with impending clinically overt HF. Therefore, combination of echo and pulsed-wave blood-flow and tissue Doppler with NPs appears valuable in guiding ambulatory HF management, since they are potentially useful to distinguish stable patients from those at high risk of decompensation.

  14. Human errors related to maintenance and modifications

    International Nuclear Information System (INIS)

    Laakso, K.; Pyy, P.; Reiman, L.

    1998-01-01

    The focus in human reliability analysis (HRA) relating to nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, some studies and incidents have shown that also maintenance errors, which have taken place earlier in plant history, may have an impact on the severity of a disturbance, e.g. if they disable safety related equipment. Especially common cause and other dependent failures of safety systems may significantly contribute to the core damage risk. The first aim of the study was to identify and give examples of multiple human errors which have penetrated the various error detection and inspection processes of plant safety barriers. Another objective was to generate numerical safety indicators to describe and forecast the effectiveness of maintenance. A more general objective was to identify needs for further development of maintenance quality and planning. In the first phase of this operational experience feedback analysis, human errors recognisable in connection with maintenance were looked for by reviewing about 4400 failure and repair reports and some special reports which cover two nuclear power plant units on the same site during 1992-94. A special effort was made to study dependent human errors since they are generally the most serious ones. An in-depth root cause analysis was made for 14 dependent errors by interviewing plant maintenance foremen and by thoroughly analysing the errors. A more simple treatment was given to maintenance-related single errors. The results were shown as a distribution of errors among operating states i.a. as regards the following matters: in what operational state the errors were committed and detected; in what operational and working condition the errors were detected, and what component and error type they were related to. These results were presented separately for single and dependent maintenance-related errors. As regards dependent errors, observations were also made

  15. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XIV, I--MAINTAINING THE AIR SYSTEM, CUMMINS DIESEL ENGINE, II--UNIT REMOVAL--TRANSMISSION.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATING PRINCIPLES AND MAINTENANCE OF THE DIESEL ENGINE AIR SYSTEM AND THE PROCEDURES FOR TRANSMISSION REMOVAL. TOPICS ARE (1) DEFINITION OF TERMS RELATED TO THE DIESEL AIR SYSTEM, (2) PRNCIPLES OF DIESEL AIR COMPRESSORS, (3) PRINCIPLES OF AIR STARTING MOTORS, (4)…

  16. AUTOMOTIVE DIESEL MAINTENANCE L. UNIT XII, PART I--MAINTAINING THE FUEL SYSTEM (PART II), CUMMINS DIESEL ENGINE, PART II--UNIT INSTALLATION (ENGINE).

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND THE PROCEDURES FOR DIESEL ENGINE INSTALLATION. TOPICS ARE FUEL FLOW CHARACTERISTICS, PTG FUEL PUMP, PREPARATION FOR INSTALLATION, AND INSTALLING ENGINE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH…

  17. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XI, PART I--MAINTAINING THE FUEL SYSTEM (PART I), CUMMINS DIESEL ENGINES, PART II--UNIT REPLACEMENT (ENGINE).

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF DIFFERENCES BETWEEN TWO AND FOUR CYCLE ENGINES, THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM, AND THE PROCEDURES FOR DIESEL ENGINE REMOVAL. TOPICS ARE (1) REVIEW OF TWO CYCLE AND FOUR CYCLE CONCEPT, (2) SOME BASIC CHARACTERISTICS OF FOUR CYCLE ENGINES,…

  18. Review and evaluation of the Millstone Unit 3 probabilistic safety study. Containment failure modes, radiological source - terms and offsite consequences

    International Nuclear Information System (INIS)

    Khatib-Rahbar, M.; Pratt, W.; Ludewig, H.

    1985-09-01

    A technical review and evaluation of the Millstone Unit 3 probabilistic safety study has been performed. It was determined that; (1) long-term damage indices (latent fatalities, person-rem, etc.) are dominated by late failure of the containment, (2) short-term damage indices (early fatalities, etc.) are dominated by bypass sequences for internally initiated events, while severe seismic sequences can also contribute significantly to early damage indices. These overall estimates of severe accident risk are extremely low compared with other societal sources of risk. Furthermore, the risks for Millstone-3 are comparable to risks from other nuclear plants at high population sites. Seismically induced accidents dominate the severe accident risks at Millstone-3. Potential mitigative features were shown not to be cost-effective for internal events. Value-impact analysis for seismic events showed that a manually actuated containment spray system might be cost-effective

  19. Transformer failure and common-mode loss of instrument power at Nine Mile Point Unit 2 on August 13, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    On August 13, 1991, at Nine Mile Point Unit 2 nuclear power plant, located near Scriba, New York, on Lake Ontario, the main transformer experienced an internal failure that resulted in degraded voltage which caused the simultaneous loss of five uninterruptible power supplies, which in turn caused the loss of several nonsafety systems, including reactor control rod position indication, some reactor power and water indication, control room annunciators, the plant communications system, the plant process computer, and lighting at some locations. The reactor was subsequently brought to a safe shutdown. Following this event, the US Nuclear Regulatory Commission dispatched an Incident Investigation Team to the site to determine what happened, to identify the probable causes, and to make appropriate findings and conclusions. This report describes the incident, the methodology used by the team in its investigation, and presents and the team's findings and conclusions. 59 figs., 14 tabs.

  20. Transformer failure and common-mode loss of instrument power at Nine Mile Point Unit 2 on August 13, 1991

    International Nuclear Information System (INIS)

    1991-10-01

    On August 13, 1991, at Nine Mile Point Unit 2 nuclear power plant, located near Scriba, New York, on Lake Ontario, the main transformer experienced an internal failure that resulted in degraded voltage which caused the simultaneous loss of five uninterruptible power supplies, which in turn caused the loss of several nonsafety systems, including reactor control rod position indication, some reactor power and water indication, control room annunciators, the plant communications system, the plant process computer, and lighting at some locations. The reactor was subsequently brought to a safe shutdown. Following this event, the US Nuclear Regulatory Commission dispatched an Incident Investigation Team to the site to determine what happened, to identify the probable causes, and to make appropriate findings and conclusions. This report describes the incident, the methodology used by the team in its investigation, and presents and the team's findings and conclusions. 59 figs., 14 tabs

  1. Effects of a 14-month low-cost maintenance training program in patients with chronic systolic heart failure: a randomized study

    DEFF Research Database (Denmark)

    Prescott, Eva; Hjardem-Hansen, Rasmus; Dela, Flemming

    2009-01-01

    % CI: 3.0-13.0, P=0.002). No effect of maintenance intervention was observed for 6-min walk test, incremental shuttle walk test, sit-to-stand test, or quality of life. After 14 months changes in most markers of inflammation, endothelial damage, and glycemic control were more beneficial...... was maximum workload; secondary endpoints were 6-min walk test, incremental shuttle walk test, sit-to-stand test, quality of life, and serological markers. RESULTS: Six patients died and 43 completed the study. The initial 8-week training was associated with small but significant improvement in all...... in the intervention group. CONCLUSION: A low-cost maintenance intervention in CHF patients reduced the decline in the maximum workload compared with usual care but not in other measures of physical function. Results suggest beneficial effects of long-term maintenance training on glycemic control, inflammation...

  2. Predictive maintenance policy for a gradually deteriorating system subject to stress

    Energy Technology Data Exchange (ETDEWEB)

    Deloux, E. [IRCCyN/Ecole des Mines de Nantes, Nantes (France); Castanier, B. [IRCCyN/Ecole des Mines de Nantes, Nantes (France)], E-mail: bruno.castanier@emn.fr; Berenguer, C. [Universite de Technologie de Troyes/CNRS, Troyes (France)

    2009-02-15

    This paper deals with a predictive maintenance policy for a continuously deteriorating system subject to stress. We consider a system with two failure mechanisms which are, respectively, due to an excessive deterioration level and a shock. To optimize the maintenance policy of the system, an approach combining statistical process control (SPC) and condition-based maintenance (CBM) is proposed. CBM policy is used to inspect and replace the system according to the observed deterioration level. SPC is used to monitor the stress covariate. In order to assess the performance of the proposed maintenance policy and to minimize the long-run expected maintenance cost per unit of time, a mathematical model for the maintained system cost is derived. Analysis based on numerical results are conducted to highlight the properties of the proposed maintenance policy in respect to the different maintenance parameters.

  3. Predictive maintenance policy for a gradually deteriorating system subject to stress

    International Nuclear Information System (INIS)

    Deloux, E.; Castanier, B.; Berenguer, C.

    2009-01-01

    This paper deals with a predictive maintenance policy for a continuously deteriorating system subject to stress. We consider a system with two failure mechanisms which are, respectively, due to an excessive deterioration level and a shock. To optimize the maintenance policy of the system, an approach combining statistical process control (SPC) and condition-based maintenance (CBM) is proposed. CBM policy is used to inspect and replace the system according to the observed deterioration level. SPC is used to monitor the stress covariate. In order to assess the performance of the proposed maintenance policy and to minimize the long-run expected maintenance cost per unit of time, a mathematical model for the maintained system cost is derived. Analysis based on numerical results are conducted to highlight the properties of the proposed maintenance policy in respect to the different maintenance parameters

  4. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E. [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1998-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  5. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1999-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  6. Rol del fallo mecánico en la optimización del mantenimiento en una central nuclear//Role of the mechanical failure during the maintenance optimization in the nuclear power plant

    Directory of Open Access Journals (Sweden)

    Antonio Torres-Valle

    2012-05-01

    Full Text Available Entre las más recientes aplicaciones del Análisis Probabilista de Seguridad (1997 – 2003 de la Central Nuclear Embalse en Argentina, está el Programa de Mantenimiento Orientado a la Seguridad (2006– 2009 el cual se ha desarrollado con el empleo de la metodología de Mantenimiento Centrado en la Confiabilidad (RCM en inglés. El objetivo general del artículo es demostrar la alta contribución de los fallos mecánicos en el diseño de las políticas de mantenimiento de varios sistemas de la instalación a través del empleo de la metodología RCM. La composición, estructura y políticas de explotación de los sistemas tecnológicos de muchas instalaciones con riesgo asociado, similares a las de los sistemas analizados en este estudio, permite inferir que los resultados que se obtendrán serán equivalentes de aplicarse la metodología RCM en dichas instalaciones. Palabras claves: mantenimiento centrado en la confiabilidad, mantenimiento predictivo, mantenimiento preventivo, fallo mecánico, seguridad, confiabilidad, riesgo.______________________________________________________________________________ Abstract One of the most recent applications of Probabilistic Safety Analysis (1997 – 2003 to Embalse Nuclear Power Plant in Argentina, is the Safety Oriented Maintenance Program (2006 – 2009 developed with employment of the Reliability Centered Maintenance (RCM methodology. The general objective of the paper is to demonstrate the high contribution of the mechanical failures in the maintenance program design through the RCM methodology. The composition, structure and operation strategies of the technological systems of many risk associated facilities, similar to the analysed systems included in this study, allow deduce that the results will equivalent in case of application of RCM methodology in such facilities. Key words: reliability centered maintenance (RCM, predictive maintenance, preventive maintenance, mechanical failure, safety

  7. Failure analysis of cracked head spray piping from the Dresden Unit 2 Boiling Water Reactor

    International Nuclear Information System (INIS)

    Diercks, D.R.; Dragel, G.M.

    1983-07-01

    Several sections of Type 304 stainless steel head spray piping, 6.25 cm (2.5 in.) in diameter, from the Dresden Unit 2 Boiling Water Reactor were examined to determine the nature and causes of coolant leakages detected during hydrostatic tests. Extensive pitting was observed on the outside surface of the piping, and three cracks, all located at a helical stripe apparently rubbed onto the outer surface of the piping, were also noted. Metallographic examination revealed that the cracking had initiated at the outer surface of the pipe, and showed it to be transgranular and highly branched, characteristic of chloride stress corrosion cracking. The surface pitting also appeared to have been caused by chlorides. A scanning electron microprobe x-ray analysis of the corrosion product in the cracks confirmed the presence of chlorides and also indicated the presence of calcium

  8. MANAGEMENT PROCEDURE OF SUPPLIES OF UNITS, MATERIALS AND CONSTITUENT PARTS FOR REPAIR AND MAINTENANCE SUPPORT OF TRANSPORT AND PRODUCTION MACHINES

    Directory of Open Access Journals (Sweden)

    Victor Yurievich Stroganov

    2017-05-01

    Full Text Available This article considers a question of creation of schemes and sequence of passing of the main stages of process of execution of repair and maintenance works order taking into account formation of stocks of necessary spare parts, materials and constituent parts. Models of an input stream are offered for inventory control system, which are rather adequately described by autoregressive models of order two.

  9. Scientists, engineers and technicians in nuclear reactor operation and maintenance. Fifteen years of growth and change in the United States of America

    International Nuclear Information System (INIS)

    Chewning, J.S.

    1980-01-01

    Between 1962 and 1977 the number of nuclear reactors in the United States of America increased from 4 to 65, and the total capacity increased from 730 to 47013 MW. Employment in the reactor operation and maintenance sector, which increased correspondingly from 633 to 17270, showed the earmarks of a maturing industry. By the end of that 15-year span, fewer workers were involved in research and development activities, and the proportion of scientists and engineers had decreased as the duties and responsibilities became more standardized and routine and could be taken over by highly trained technicians. There were also subtle changes in the discipline mixes. Nuclear and reactor engineers took their place in the labour force in increasing numbers as nuclear engineering was recognized as a distinct occupation, and there was a corresponding decrease in the proportion of more traditional engineering disciplines. Life science disciplines increased as concern grew for the health and safety of nuclear workers and the general public, and the physical science disciplines decreased in importance as proportionally less research and development was carried out in reactor operation and maintenance. A profile of nuclear power plant personnel drawn from refined data shows that the industry has truly 'come of age.' By far the largest group of workers is made up of technicians, with the second largest group made up of skilled craftworkers. Less than 30% of all workers in nuclear power operation and maintenance in 1977 were in professional occupations. (author)

  10. Space station orbit maintenance

    Science.gov (United States)

    Kaplan, D. I.; Jones, R. M.

    1983-01-01

    The orbit maintenance problem is examined for two low-earth-orbiting space station concepts - the large, manned Space Operations Center (SOC) and the smaller, unmanned Science and Applications Space Platform (SASP). Atmospheric drag forces are calculated, and circular orbit altitudes are selected to assure a 90 day decay period in the event of catastrophic propulsion system failure. Several thrusting strategies for orbit maintenance are discussed. Various chemical and electric propulsion systems for orbit maintenance are compared on the basis of propellant resupply requirements, power requirements, Shuttle launch costs, and technology readiness.

  11. Maintenance optimization after RCM

    International Nuclear Information System (INIS)

    Doyle, E.K.; Lee, C.-G.; Cho, D.

    2005-01-01

    Variant forms of RCM (Reliability Centered Maintenance) have been the maintenance optimizing tools of choice in industry for the last 20 years. Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data are now being evaluated. The evaluation includes a requirement to demonstrate that earlier optimization projects have long term positive impacts. This proved to be a significant challenge. Eventually a methodology was developed using Crowe/AMSAA (Army Materials Systems Analysis Activity) plots to justify expenditures on further optimization efforts. (authors)

  12. Assessment of reliability and maintenance of motor operated valves at Finnish NPPS

    International Nuclear Information System (INIS)

    Laakso, K.; Haenninen, S.; Simola, K.

    1994-01-01

    This paper summarizes two studies on motor operated valve (MOV) failure and maintenance experiences in Finnish nuclear power plants. In the first study, described in section 2 of this paper, the failure reports of MOVs at Finnish BWR units from a nine years' time period were analyzed in a systematic way. The dominant failure mechanisms were identified and time-dependencies in failure occurrence were studied. This study initiated an experience based reliability centered maintenance (RCM) analysis of motor operated valve drives, which is summarized in chapter 3 of this paper. The RCM analysis resulted in the identification and proposal of the most suitable and effective maintenance tasks for consideration. 9 refs, 3 figs, 1 tab

  13. Maintenance training centre at NPP Paks, Hungary

    International Nuclear Information System (INIS)

    Babos, K.

    1996-01-01

    The lecture shows the feature of WWER-440/213 units maintenance, the existing maintenance training system, the necessity of the change in maintenance training system at NPP Paks. The author introduces the would-be maintenance training centre, the training facilities and the main tasks related to the maintenance training. (author)

  14. Maintenance of serum potassium with sodium zirconium cyclosilicate (ZS-9) in heart failure patients : results from a phase 3 randomized, double-blind, placebo-controlled trial

    NARCIS (Netherlands)

    Anker, Stefan D.; Kosiborod, Mikhail; Zannad, Faiez; Pina, Ileana L.; McCullough, Peter A.; Filippatos, Gerasimos; van der Meer, Peter; Ponikowski, Piotr; Rasmussen, Henrik S.; Lavin, Philip T.; Singh, Bhupinder; Yang, Alex; Deedwania, Prakash

    2015-01-01

    AimsHyperkalaemia in heart failure patients limits use of cardioprotective renin-angiotensin-aldosterone system inhibitors (RAASi). Sodium zirconium cyclosilicate (ZS-9) is a selective potassium ion trap, whose mechanism of action may allow for potassium binding in the upper gastrointestinal tract

  15. [Ten-year evolution of mechanical ventilation in acute respiratory failure in the hematogical patient admitted to the intensive care unit].

    Science.gov (United States)

    Belenguer-Muncharaz, A; Albert-Rodrigo, L; Ferrandiz-Sellés, A; Cebrián-Graullera, G

    2013-10-01

    A comparison was made between invasive mechanical ventilation (IMV) and noninvasive positive pressure ventilation (NPPV) in haematological patients with acute respiratory failure. A retrospective observational study was made from 2001 to December 2011. A clinical-surgical intensive care unit (ICU) in a tertiary hospital. Patients with hematological malignancies suffering acute respiratory failure (ARF) and requiring mechanical ventilation in the form of either IMV or NPPV. Analysis of infection and organ failure rates, duration of mechanical ventilation and ICU and hospital stays, as well as ICU, hospital and mortality after 90 days. The same variables were analyzed in the comparison between NPPV success and failure. Forty-one patients were included, of which 35 required IMV and 6 NPPV. ICU mortality was higher in the IMV group (100% vs 37% in NPPV, P=.006). The intubation rate in NPPV was 40%. Compared with successful NPPV, failure in the NPPV group involved more complications, a longer duration of mechanical ventilation and ICU stay, and greater ICU and hospital mortality. Multivariate analysis of mortality in the NPPV group identified NPPV failure (OR 13 [95%CI 1.33-77.96], P=.008) and progression to acute respiratory distress syndrome (OR 10 [95%CI 1.95-89.22], P=.03) as prognostic factors. The use of NPPV reduced mortality compared with IMV. NPPV failure was associated with more complications. Copyright © 2012 Elsevier España, S.L. and SEMICYUC. All rights reserved.

  16. Condition based maintenance in the context of opportunistic maintenance

    NARCIS (Netherlands)

    Koochaki, Javid; Bokhorst, Jos A. C.; Wortmann, Hans; Klingenberg, Warse

    2012-01-01

    Condition based maintenance (CBM) uses the operating condition of a component to predict a failure event. Compared to age based replacement (ABR), CBM usually results in higher availability and lower maintenance costs, since it tries to prevent unplanned downtime and avoid unnecessary preventive

  17. Positive predictive value and impact of misdiagnosis of a heart failure diagnosis in administrative registers among patients admitted to a University Hospital cardiac care unit

    DEFF Research Database (Denmark)

    Mard, Shan; Nielsen, Finn Erland

    2010-01-01

    OBJECTIVE: To evaluate the positive predictive value (PPV) of a diagnosis of heart failure (HF) in the Danish National Registry of Patients (NRP) among patients admitted to a University Hospital cardiac care unit, and to evaluate the impact of misdiagnosing HF. DESIGN: The NRP was used to identify...

  18. Routine Ultrasound Quality Assurance in a Multi-Unit Radiology Department: A Retrospective Evaluation of Transducer Failures.

    Science.gov (United States)

    Vitikainen, Anne-Mari; Peltonen, Juha I; Vartiainen, Eija

    2017-09-01

    The importance of quality assurance (QA) in medical ultrasound (US) has been widely recognized and recommendations concerning technical QA have been published over the years. However, the demonstrated impact of a properly working QA protocol on clinical routine has been scarce. We investigated the transducer write-off causes for a 5-y period in a multi-unit radiology department with an annual average of 230 transducers in demanding diagnostic use. The transducer faults and the initial observers of the faults leading to transducer write-offs were traced and categorized. The most common cause of transducer write-off was an image uniformity problem or element failure. Mechanical faults or excessive leakage current and defects in the lens constituted smaller yet substantial shares. Our results suggest that a properly working routine QA program can detect majority of the faults before they are reported by users. Copyright © 2017 World Federation for Ultrasound in Medicine & Biology. Published by Elsevier Inc. All rights reserved.

  19. Intensive symptom control of opioid-refractory dyspnea in congestive heart failure: Role of milrinone in the palliative care unit.

    Science.gov (United States)

    Silvestre, Julio; Montoya, Maria; Bruera, Eduardo; Elsayem, Ahmed

    2015-12-01

    We describe an exemplary case of congestive heart failure (CHF) symptoms controlled with milrinone. We also analyze the benefits and risks of milrinone administration in an unmonitored setting. We describe the case of a patient with refractory leukemia and end-stage CHF who developed severe dyspnea after discontinuation of milrinone. At that point, despite starting opioids, she had been severely dyspneic and anxious, requiring admission to the palliative care unit (PCU) for symptom control. After negotiation with hospital administrators, milrinone was administered in an unmonitored setting such as the PCU. A multidisciplinary team approach was also provided. Milrinone produced a dramatic improvement in the patient's symptom scores and performance status. The patient was eventually discharged to home hospice on a milrinone infusion with excellent symptom control. This case suggests that milrinone may be of benefit for short-term inpatient administration for dyspnea management, even in unmonitored settings and consequently during hospice in do-not-resuscitate (DNR) patients. This strategy may reduce costs and readmissions to the hospital related to end-stage CHF.

  20. Nuclear Power Plant Preventive Maintenance Scheduling Problem with Fuzziness

    International Nuclear Information System (INIS)

    Abass, S.A.; Abdallah, A.S.

    2013-01-01

    Maintenance activity is regarded as the most important key factor for the safety, reliability and economy of a nuclear power plant. Preventive maintenance refers to set of planned activities which include nondestructive testing and periodic inspection as well as maintenance. In this paper, we address the problem of nuclear power plant preventive maintenance scheduling with uncertainty. The uncertainty will be represented by fuzzy parameters. The problem is how to determine the period for which generating units of an electric system should be taken off line for planned preventive maintenance over specific time horizon. Preventive maintenance activity of a nuclear power plant is an important issue as it designed to extend the plant life . It is more required to review the maintenance not only from the view point of safety and reliability but also economy. Preventive maintenance program exists to ensure that nuclear safety significant equipment will function when it is supposed to. Also this problem is extremely important because a failure in a power plant may cause a general breakdown in an electric network. In this paper a mixed integer programming model is used to express this problem. In proposed model power demand is taken as fuzzy parameters. A case study is provided to demonstrate the efficiency of the proposed model.

  1. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  2. Effectiveness of Prepared Instruction Units in Teaching the Principles of Internal Combustion Engine Operation and Maintenance. Technical Bulletin No. 192.

    Science.gov (United States)

    Jacobs, Clinton O.

    The report is an evaluation of the effectiveness of the 12 instructional units developed around the use of the Briggs-Stratton Model 80302, 3HP, 8 cu. in. displacement engine having a fuel induction system similar in construction to farm tractor types. The evaluation procedure used was the "one-group Pre-test and Post-test" research method. The…

  3. Managing aging in nuclear power plants: Insights from NRC's Maintenance Team Inspection reports

    International Nuclear Information System (INIS)

    Fresco, A.; Subudhi, M.

    1992-01-01

    A plant's maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of sixty-seven of the reports issued on these in-depth team inspections have been reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components (SSCs). Relevant information has been extracted from these inspection reports sorted into several categories; including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified

  4. Risk-Based Predictive Maintenance for Safety-Critical Systems by Using Probabilistic Inference

    Directory of Open Access Journals (Sweden)

    Tianhua Xu

    2013-01-01

    Full Text Available Risk-based maintenance (RBM aims to improve maintenance planning and decision making by reducing the probability and consequences of failure of equipment. A new predictive maintenance strategy that integrates dynamic evolution model and risk assessment is proposed which can be used to calculate the optimal maintenance time with minimal cost and safety constraints. The dynamic evolution model provides qualified risks by using probabilistic inference with bucket elimination and gives the prospective degradation trend of a complex system. Based on the degradation trend, an optimal maintenance time can be determined by minimizing the expected maintenance cost per time unit. The effectiveness of the proposed method is validated and demonstrated by a collision accident of high-speed trains with obstacles in the presence of safety and cost constrains.

  5. Dependent failures of diesel generators

    International Nuclear Information System (INIS)

    Mankamo, T.; Pulkkinen, U.

    1982-01-01

    This survey of dependent failures (common-cause failures) is based on the data of diesel generator failures in U. S. nuclear power plants as reported in Licensee Event Reports. Failures were classified into random and potentially dependent failures. All failures due to design errors, manufacturing or installation errors, maintenance errors, or deviations in the operational environment were classified as potentially dependent failures.The statistical dependence between failures was estimated from the relative portion of multiple failures. Results confirm the earlier view of the significance of statistical dependence, a strong dependence on the age of the diesel generator was found in each failure class excluding random failures and maintenance errors, which had a nearly constant frequency independent of diesel generator age

  6. Excellence through maintenance mastering

    International Nuclear Information System (INIS)

    Lamarche, M.; Guillot, M.; Monier, M.

    1987-01-01

    To improve the overall availability factor of nuclear power plants you have to cut either the forced outage role and the planned outage time or you need to reduce simultaneously the failures and the efforts devoted to avoiding them. Among other results, this goal leads to a decrease in the number of real or anticipated problems. Electricite de France policy, in this matter, is to focus on decreasing the compoents' maintenance needs through a comprehensive modification program, targeted to eliminating the weak points as revealed by the operation. Thereby one may reach, for simple equipment, a nearly maintenance-free condition in which the only maintenance needed is surveillance, which provides assurance that everything is operating properly. A good example of this type of equipment is the family of static components, drums, and pipes whose corrective maintenance is almost nil when their initial condition is good

  7. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Smith, J. L.

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS)

  8. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    J. L. Smith

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS).

  9. A study on maintenance rule program and its application to Korean NPP - Rev.1

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Kim, Kil Yoo; Yang, Joon Eon; Ha, Jae Joo

    2001-03-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project

  10. A study on maintenance rule program and its application at Korean NPPs

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Kim, Kil Yoo; Kang, Dae Il; Yang, Joon Eon; Ha, Jae Joo

    2000-11-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project

  11. A study on maintenance rule program and its application at Korean NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Mee Jeong; Kim, Kil Yoo; Kang, Dae Il; Yang, Joon Eon; Ha, Jae Joo

    2000-11-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project.

  12. Acute renal failure requiring renal replacement therapy in the intensive care unit: impact on prognostic assessment for shared decision making.

    Science.gov (United States)

    Johnson, Robert F; Gustin, Jillian

    2011-07-01

    A 69-year-old female was receiving renal replacement therapy (RRT) for acute renal failure (ARF) in an intensive care unit (ICU). Consultation was requested from the palliative medicine service to facilitate a shared decision-making process regarding goals of care. Clinician responsibility in shared decision making includes the formulation and expression of a prognostic assessment providing the necessary perspective for a spokesperson to match patient values with treatment options. For this patient, ARF requiring RRT in the ICU was used as a focal point for preparing a prognostic assessment. A prognostic assessment should include the outcomes of most importance to a discussion of goals of care: mortality risk and survivor functional status, in this case including renal recovery. A systematic review of the literature was conducted to document published data regarding these outcomes for adult patients receiving RRT for ARF in the ICU. Forty-one studies met the inclusion criteria. The combined mean values for short-term mortality, long-term mortality, renal-function recovery of short-term survivors, and renal-function recovery of long-term survivors were 51.7%, 68.6%, 82.0%, and 88.4%, respectively. This case example illustrates a process for formulating and expressing a prognostic assessment for an ICU patient requiring RRT for ARF. Data from the literature review provide baseline information that requires adjustment to reflect specific patient circumstances. The nature of the acute primary process, comorbidities, and severity of illness are key modifiers. Finally, the prognostic assessment is expressed during a family meeting using recommended principles of communication.

  13. Characteristics and in-hospital outcomes of patients with acute coronary syndromes and heart failure in the United Arab Emirates.

    Science.gov (United States)

    Shehab, Abdulla; Al-Dabbagh, Bayan; Almahmeed, Wael; Bustani, Nazar; Nagelkerke, Nicolaas; Yusufali, Afzal; Wassef, Adel; Ibrahim, Mohamed; Brek, Azan Bin

    2012-09-26

    Heart failure (HF) is a serious complication of acute coronary syndromes (ACS), and is associated with high in-hospital mortality and poor long-term survival. The aims of this study were to describe the clinical characteristics, management and in-hospital outcomes of coronary syndrome (ACS) patients with HF in the United Arab Emirates. The study was selected from the Gulf Registry of Acute Coronary Events (Gulf RACE), a prospective multi-national, multicenter registry of patients hospitalized with ACS in six Middle East countries. The present analysis was focused on participants admitted to various hospitals in the UAE with a diagnosis of ACS in 2007 and were analyzed in terms of HF (Killip class II/III and IV) on admission. Of 1691 patients (mean age: 52.6 ± 11.7 years; 210 Females, 1481 Males) with ACS, 356 (21%) had an admission diagnosis of HF (Killip class II/III and IV). HF patients were less frequently males (19.2% vs. 34.3%; P < 0.001). HF was more frequently associated with hypertension (64.3% vs. 43.9%; P < 0.001), hyperlipidemia (49.4% vs. 31.8%; P < 0.001) and diabetes mellitus (DM) (51.1% vs. 36.2%; P < 0.001). HF was significantly associated with in-hospital mortality (OR = 11.821; 95% CI: 5.385-25.948; P < 0.001). In multivariate logistic regression, age, hyperlipidemia, heart rate and DM were associated with higher in-hospital HF. HF is observed in about 1 in 5 patients with ACS in the UAE and is associated with a significant increase in in-hospital mortality and other adverse outcomes.

  14. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  15. Maintenance methods

    International Nuclear Information System (INIS)

    Sanchis, H.; Aucher, P.

    1990-01-01

    The maintenance method applied at the Hague is summarized. The method was developed in order to solve problems relating to: the different specialist fields, the need for homogeneity in the maintenance work, the equipment diversity, the increase of the materials used at the Hague's new facilities. The aim of the method is to create a knowhow formalism, to facilitate maintenance, to ensure the running of the operations and to improve the estimation of the maintenance cost. One of the method's difficulties is the demonstration of the profitability of the maintenance operations [fr

  16. Maintenance or replacement of primary equipments

    International Nuclear Information System (INIS)

    Branchu, J.

    1995-01-01

    The principal materials, such as the primary equipments of a PWR type steam generator, have a finite service life. Framatome, builder of steam generators and maintenance contractor of Electricite de France has developed a methodology for the maintenance or the replacement of primary equipments. The paper describes the methodology followed by Framatome to identify and localize the wear mode and to treat or repair the component. Four failure modes have been considered: crack propagation, rubbing/vibration wear, neutron irradiation and corrosion propagation under permanent stress. A kinetic modelling of wear propagation has been computerized and validated using mechanical tests on Inconel 600 mockups. These analyses have allow to determine the strategy of repair or replacement of vessel heads for each unit. The method is evaluated taking into account the risk assessment, cost, dosimetry, efficiency and time delay involved. (J.S.). 1 fig., 3 photos

  17. A preventive maintenance policy based on dependent two-stage deterioration and external shocks

    International Nuclear Information System (INIS)

    Yang, Li; Ma, Xiaobing; Peng, Rui; Zhai, Qingqing; Zhao, Yu

    2017-01-01

    This paper proposes a preventive maintenance policy for a single-unit system whose failure has two competing and dependent causes, i.e., internal deterioration and sudden shocks. The internal failure process is divided into two stages, i.e. normal and defective. Shocks arrive according to a non-homogeneous Poisson process (NHPP), leading to the failure of the system immediately. The occurrence rate of a shock is affected by the state of the system. Both an age-based replacement and finite number of periodic inspections are schemed simultaneously to deal with the competing failures. The objective of this study is to determine the optimal preventive replacement interval, inspection interval and number of inspections such that the expected cost per unit time is minimized. A case study on oil pipeline maintenance is presented to illustrate the maintenance policy. - Highlights: • A maintenance model based on two-stage deterioration and sudden shocks is developed. • The impact of internal system state on external shock process is studied. • A new preventive maintenance strategy combining age-based replacements and periodic inspections is proposed. • Postponed replacement of a defective system is provided by restricting the number of inspections.

  18. Remote maintenance development

    International Nuclear Information System (INIS)

    Zook, C.R.

    1979-01-01

    The concept of remote maintenance as it pertains to nuclear fuel fabrication facilities is quite unique. The future may require completely remote facilities where maintenance will be performed by hybrid manipulators/robots. These units will be capable of being preprogrammed for automatic operation or manually operated with the operator becoming a part of the closed loop control system. These robots will mesh television, computer control, and direct force feedback manual control in a usable new concept of robotics

  19. Use of risk importance measures in maintenance prioritization

    International Nuclear Information System (INIS)

    Dubreil Chambardel, A.; Ardorino, F.; Mauger, P.

    1997-01-01

    A RCM method has been developed at EDF since 1990 to optimize maintenance through a prioritization of resources for equipment that are important in terms of safety, availability and maintenance costs. In 1994, the Nuclear Power Plant Operations Division decided to apply this method to the most important systems of the French PWRs. About 50 systems are in the scope of the RCM. Those that have a role in safety were ranked depending on their contribution to the risk of core melt provided by PSAs. The RCM studies on the 20 most important to safety systems are performed by the Nuclear Power Plant Operations division, the other 30 systems are studied on sites. The RCM study consists first in the research of equipment and failures modes significant to safety, availability or maintenance costs and the evaluation of the performance of those equipment. Those studies lead to the distinction of equipment and failure modes that are critical or non critical to safety, availability and costs. The last part of the study consists in optimizing maintenance on those equipment. In this process, risk measures are used to help defining equipment and failure modes critical to safety. This is done by calculation of risk importance measures provided by PSAs. We explain in this paper which measures of risk have been defined, how PSAs allow calculation of those measures, and how we used those results in the RCM studies we processed. We give also extensions of the use of those measures in the process of defining optimized maintenance tasks. After having defined a RCM method for the French PWRs, the Nuclear Power plant Operations Division decided to start a generalized program of maintenance optimization for the most important systems. The three criteria on which the method relies are: safety, unit availability and maintenance costs. We present here the safety aspect of the method and more precisely these of risk importance measures in the RCM process. (author)

  20. Mobile network maintenance (GSM)

    CERN Multimedia

    IT Department

    2009-01-01

    Maintenance work will be carried out on the CERN mobile network infrastructure (GSM) on the 23 and 24 July from 6 p.m. to 6 a.m. in order to replace discontinued equipment and to increase the bandwidth capacity of the GSM mobile network. All CERN GSM emitters (40 units) will be moved one by one to the new infrastructure during the maintenance. The call of a user connected to an emitter at the time of its maintenance will be cut off. However, the general overlapping of the GSM radio coverage should mean that users are able immediately to call again should their call be interrupted. IT/CS/CS

  1. A COMPUTER BASED MAINTENANCE MANAGEMENT SYSTEM ...

    African Journals Online (AJOL)

    ... programs to schedule for maintenance or replacement of machines has been designed such that it enables the maintenance department control all jobs associated with plant maintenance and breakdown. It predicts the time to failure of designated plants and caters for the replacement analysis of some capital equipment.

  2. Maintenance considerations of the STARFIRE commercial tokamak

    International Nuclear Information System (INIS)

    Trachsel, C.A.; Zahn, H.S.; Field, R.E.; Stevens, H.C.

    1979-01-01

    This paper presents the maintenance approach, the commercial tokamak design features that enhance maintenance and preliminary repair time and required mean-time-between-failures for major subsystems. Reactor hall building and maintenance equipment requirements including hot cells, coil rewinding, and cranes are discussed

  3. Serum 1H-NMR metabolomic fingerprints of acute-on-chronic liver failure in intensive care unit patients with alcoholic cirrhosis.

    Directory of Open Access Journals (Sweden)

    Roland Amathieu

    Full Text Available INTRODUCTION: Acute-on-chronic liver failure is characterized by acute deterioration of liver function in patients with compensated or decompensated, but stable, cirrhosis. However, there is no accurate definition of acute-on-chronic liver failure and physicians often use this term to describe different clinical entities. Metabolomics investigates metabolic changes in biological systems and identifies the biomarkers or metabolic profiles. Our study assessed the metabolomic profile of serum using proton nuclear magnetic resonance ((1H-NMR spectroscopy to identify metabolic changes related to acute-on-chronic liver failure. PATIENTS: Ninety-three patients with compensated or decompensated cirrhosis (CLF group but stable liver function and 30 patients with cirrhosis and hospitalized for the management of an acute event who may be responsible of acute-on-chronic liver failure (ACLF group, were fully analyzed. Blood samples were drawn at admission, and sera were separated and stored at -80°C until (1H-NMR spectral analysis. Using orthogonal projection to latent-structure discriminant analyses, various metabolites contribute to the complete separation between these both groups. RESULTS: The predictability of the model was 0.73 (Q(2 Y and the explained variance was 0.63 (R(2 Y. The main metabolites that had increased signals related to acute-on-chronic liver failure were lactate, pyruvate, ketone bodies, glutamine, phenylalanine, tyrosine, and creatinine. High-density lipids were lower in the ALCF group than in CLF group. CONCLUSION: A serum metabolite fingerprint for acute-on-chronic liver failure, obtained with (1H-NMR, was identified. Metabolomic profiling may aid clinical evaluation of patients with cirrhosis admitted into intensive care units with acute-on-chronic liver failure, and provide new insights into the metabolic processes involved in acute impairment of hepatic function.

  4. Incidence of the acute renal failure in the intensive care unit at the General Hospital of Mexico: Risk factors and associated morbidity and mortality

    OpenAIRE

    Herrera-Méndez, J.; Sánchez-Velázquez, L.D.; González-Chávez, A.; Rodríguez-Terán, G.

    2015-01-01

    Background: The acute renal failure (ARF) contributes to a longer hospital stay, morbidity, mortality and use of resources in critical patients. The estimate of its incidence was difficult, mainly due to the lack of a generally accepted definition. Objective: To determine the incidence, risk factors and effects of the ARF in critical patients. Material and methods: Study of prospective cohort. Patients hospitalised in the Intensive Care Unit (ICU) were included. The population was di...

  5. The effect of the United States Great Lakes on the maintenance of derecho-producing mesoscale convective systems.

    Science.gov (United States)

    Bentley, M.; Sparks, J.; Graham, R.

    2003-04-01

    The primary aim of this research is to investigate the influence of the United States Great Lakes on the intensity of mesoscale convective systems (MCSs). One of the greatest nowcast challenges during the warm season is anticipating the impact of the Great Lakes on severe convection, particularly MCSs capable of producing damaging widespread windstorms known as derechos. Since a major derecho activity corridor lies over the Great Lakes region, it is important to understand the effects of the Lakes on the intensity and propagation of severe wind producing MCSs. Specific objectives of the research include: 1) The development of a short-term climatology of MCS events that have impacted the Great Lakes region over the past seven years; 2) An analysis of radar, satellite, surface (including buoy and lighthouse observations), and lake surface temperature data to determine the environmental conditions impacting the evolution of MCSs passing over a Great Lake; 3) An examination of MCS initiation times and seasonal frequencies of occurrence to delineate temporal consistencies in MCS evolution due to changing lake surface temperatures; and 4) The development of conceptual and forecast models to help anticipate MCS intensity and morphology as these systems interact with the Great Lakes environment.

  6. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  7. Dynamic reliability networks with self-healing units

    International Nuclear Information System (INIS)

    Jenab, K.; Seyed Hosseini, S.M.; Dhillon, B.S.

    2008-01-01

    This paper presents an analytical approach for dynamic reliability networks used for the failure limit strategy in maintenance optimization. The proposed approach utilizes the moment generating function (MGF) and the flow-graph concept to depict the functional and reliability diagrams of the system comprised of series, parallel or mix configuration of self-healing units. The self-healing unit is featured by the embedded failure detection and recovery mechanisms presented by self-loop in flow-graph networks. The newly developed analytical approach provides the probability of the system failure and time-to-failure data i.e., mean and standard deviation time-to-failure used for maintenance optimization

  8. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  9. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  10. Utility based maintenance analysis using a Random Sign censoring model

    International Nuclear Information System (INIS)

    Andres Christen, J.; Ruggeri, Fabrizio; Villa, Enrique

    2011-01-01

    Industrial systems subject to failures are usually inspected when there are evident signs of an imminent failure. Maintenance is therefore performed at a random time, somehow dependent on the failure mechanism. A competing risk model, namely a Random Sign model, is considered to relate failure and maintenance times. We propose a novel Bayesian analysis of the model and apply it to actual data from a water pump in an oil refinery. The design of an optimal maintenance policy is then discussed under a formal decision theoretic approach, analyzing the goodness of the current maintenance policy and making decisions about the optimal maintenance time.

  11. Optimal policies for cumulative damage models with maintenance last and first

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Qian, Cunhua; Nakagawa, Toshio

    2013-01-01

    From the economical viewpoint of several combined PM policies in reliability theory, this paper takes up a standard cumulative damage model in which the notion of maintenance last is applied, i.e., the unit undergoes preventive maintenances before failure at a planned time T, at a damage level Z, or at a shock number N, whichever occurs last. Expected cost rates are detailedly formulated, and optimal problems of two alternative policies which combine time-based with condition-based preventive maintenances are discussed, i.e., optimal T L ⁎ for N, Z L ⁎ for T, and N L ⁎ for T are rigorously obtained. Comparison methods between such maintenance last and conventional maintenance first are explored. It is determined theoretically and numerically which policy should be adopted, according to the different methods in different cases when the time-based or the condition-based PM policy is optimized.

  12. Boiler tube failure prevention in fossil fired boilers

    International Nuclear Information System (INIS)

    Townsend, R.D.

    1993-01-01

    It is the common experience of power generating companies worldwide that the main causes of forced outages on power plant are those due to boiler tube failures on fossil units. The main reason for the large number of failures are the severe environmental conditions in fossil boilers as the effects of stress, temperature, temperature gradients, corrosion, erosion and vibration combine to produce degradation of the tube steel. Corrosion by oxidation, by combustion products and by impure boiler water can significantly reduce the tube wall thickness and result in failure of a tube many years before its designed service life. Errors can also occur in the design manufacturer, storage, operation, and maintenance of boiler tubing and the wrong material installed in a critical location can lead to premature failure. Altogether, experts in the US and UK, from many different disciplines, have identified seven broad categories of boiler tube failure mechanisms. 1 tab., 2 figs

  13. Beyond its cost, the value of maintenance: An analytical framework for capturing its net present value

    International Nuclear Information System (INIS)

    Marais, Karen B.; Saleh, Joseph H.

    2009-01-01

    Maintenance planning and activities have grown dramatically in importance across many industries and are increasingly recognized as drivers of competitiveness if managed appropriately. Correlated with this observation is the proliferation of maintenance optimization techniques in the technical literature. But while all these models deal with the cost of maintenance (as an objective function or a constraint), only a handful addresses the notion of value of maintenance, and seldom in an analytical or quantitative way. In this paper, we propose that maintenance has intrinsic value and argue that existing cost-centric models ignore an important dimension of maintenance, namely its value, and in so doing, they can lead to sub-optimal maintenance strategies. We develop a framework for capturing and quantifying the value of maintenance activities. Our framework is based on four key components. First, we consider systems that deteriorate stochastically and exhibit multi-state failures, and model their state evolution using Markov chains and directed graphs. Second, we consider that the system provides a flow of service per unit time. This flow in turn is 'priced' and a discounted cash flow is calculated resulting in a present value (PV) for each branch of the graph-or 'value trajectory' of the system. Third as the system ages or deteriorates, it migrates towards lower PV branches of the graph, or lower value trajectories. Fourth, we conceptualize maintenance as an operator (in a mathematical sense) that raises the system to a higher PV branch in the graph. We refer to the value of maintenance as the incremental PV between the pre- and post-maintenance branches of the graphs minus the cost of maintenance. The framework presented here offers rich possibilities for future work in benchmarking existing maintenance strategies based on their value implications, and in deriving new maintenance strategies that are 'value-optimized.'

  14. Sustained reduction of central line-associated bloodstream infections outside the intensive care unit with a multimodal intervention focusing on central line maintenance.

    Science.gov (United States)

    Dumyati, Ghinwa; Concannon, Cathleen; van Wijngaarden, Edwin; Love, Tanzy M T; Graman, Paul; Pettis, Ann Marie; Greene, Linda; El-Daher, Nayef; Farnsworth, Donna; Quinlan, Gail; Karr, Gloria; Ward, Lynnette; Knab, Robin; Shelly, Mark

    2014-07-01

    Central venous catheter use is common outside the intensive care units (ICUs), but prevention in this setting is not well studied. We initiated surveillance for central line-associated bloodstream infections (CLABSIs) outside the ICU setting and studied the impact of a multimodal intervention on the incidence of CLABSIs across multiple hospitals. This project was constructed as a prospective preintervention-postintervention design. The project comprised 3 phases (preintervention [baseline], intervention, and postintervention) over a 4.5-year period (2008-2012) and was implemented through a collaborative of 37 adult non-ICU wards at 6 hospitals in the Rochester, NY area. The intervention focused on engagement of nursing staff and leadership, nursing education on line care maintenance, competence evaluation, audits of line care, and regular feedback on CLABSI rates. Quarterly rates were compared over time in relation to intervention implementation. The overall CLABSI rate for all participating units decreased from 2.6/1000 line-days preintervention to 2.1/1,000 line-days during the intervention and to 1.3/1,000 line-days postintervention, a 50% reduction (95% confidence interval, .40-.59) compared with the preintervention period (P .0179). A multipronged approach blending both the adaptive and technical aspects of care including front line engagement, education, execution of best practices, and evaluation of both process and outcome measures may provide an effective strategy for reducing CLABSI rates outside the ICU. Copyright © 2014 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.

  15. Relevance of chest sonography in the diagnosis of acute respiratory failure: Comparison with current diagnostic tools in intensive care units

    Directory of Open Access Journals (Sweden)

    Rasha Daabis

    2014-10-01

    Conclusions: Lung ultrasound provided an immediate diagnosis of the underlying etiology of acute respiratory failure in most cases; it can therefore be added to the armamentarium of ICU where urgent decisions are needed for rapid diagnosis and management of patients with ARF.

  16. Optimum policies for a system with general imperfect maintenance

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Lin, Y.-B.; Liao, G.-L.

    2006-01-01

    This study considers periodic preventive maintenance policies, which maximizes the availability of a repairable system with major repair at failure. Three types of preventive maintenance are performed, namely: imperfect preventive maintenance (IPM), perfect preventive maintenance (PPM) and failed preventive maintenance (FPM). The probability that preventive maintenance is perfect depends on the number of imperfect maintenances conducted since the previous renewal cycle, and the probability that preventive maintenance remains imperfect is not increasing. The optimum preventive maintenance time that maximizes availability is derived. Various special cases are considered. A numerical example is given

  17. Condition-based maintenance for complex systems : Coordinating maintenance and logistics planning for the process industries

    NARCIS (Netherlands)

    Olde Keizer, Minou Catharina Anselma

    2016-01-01

    Maintenance planning in the process industries is extremely complex for various reasons. Plants often run nonstop, allowing little time for performing preventive maintenance. Failures should be prevented, however, as they can lead to system downtime and high losses of revenue. Corrective maintenance

  18. Maintenance Mentor

    National Research Council Canada - National Science Library

    Jacobs, John

    2003-01-01

    Maintenance Mentor (MXM) is a research effort conducted by a joint AFRL/HESR and Northrop Grumman Information Technology team to identify the basic, high-level requirements necessary for improving flight line diagnostic capabilities...

  19. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XXIV, I--MAINTAINING THE FUEL SYSTEM PART III--CATERPILLAR DIESEL ENGINE, II--UNDERSTANDING THE VOLTAGE REGULATOR/ALTERNATOR.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL AND BATTERY CHARGING SYSTEM. TOPICS ARE (1) INJECTION TIMING CONTROLS, (2) GOVERNOR, (3) FUEL SYSTEM MAINTENANCE TIPS, (4) THE CHARGING SYSTEM, (5) REGULATING THE GENERATOR/ALTERNATOR, AND (6) CHARGING SYSTEM SERVICE…

  20. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XXV, I--CATERPILLAR DIESEL ENGINE COOLING SYSTEM D-8 AND 824 MODELS, II--TIRES AND TIRE HARDWARE.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE COOLING SYSTEM AND TO PROVIDE A DESCRIPTION OF HEAVY TIRES AND WHEELS USED ON DIESEL POWERED VEHICLES. TOPICS ARE (1) THEORY OF THE COOLING SYSTEM, (2) COOLING SYSTEM COMPONENTS, (3) MAINTENANCE TIPS (COOLING SYSTEM), (4)…

  1. Regional Comparative Unit Cost Studies for Maintenance and Operation of Physical Plants in Universities and Colleges in Central States Region and Rocky Mountain Region.

    Science.gov (United States)

    Association of Physical Plant Administrators, Corvallis, OR.

    Presented in this document are data pertaining to maintenance and operations costs at colleges and universities in the central states region and the Rocky Mountain region. The major accounts included in the cost analysis are: (1) physical plant administration, (2) building maintenance, (3) custodial services, (4) utilities, (5) landscape and…

  2. Optimal post-warranty maintenance policy with repair time threshold for minimal repair

    International Nuclear Information System (INIS)

    Park, Minjae; Mun Jung, Ki; Park, Dong Ho

    2013-01-01

    In this paper, we consider a renewable minimal repair–replacement warranty policy and propose an optimal maintenance model after the warranty is expired. Such model adopts the repair time threshold during the warranty period and follows with a certain type of system maintenance policy during the post-warranty period. As for the criteria for optimality, we utilize the expected cost rate per unit time during the life cycle of the system, which has been frequently used in many existing maintenance models. Based on the cost structure defined for each failure of the system, we formulate the expected cost rate during the life cycle of the system, assuming that a renewable minimal repair–replacement warranty policy with the repair time threshold is provided to the user during the warranty period. Once the warranty is expired, the maintenance of the system is the user's sole responsibility. The life cycle of the system is defined on the perspective of the user and the expected cost rate per unit time is derived in this context. We obtain the optimal maintenance policy during the maintenance period following the expiration of the warranty period by minimizing such a cost rate. Numerical examples using actual failure data are presented to exemplify the applicability of the methodologies proposed in this paper.

  3. WE-H-BRC-01: Failure Mode and Effects Analysis of Skin Electronic Brachytherapy Using Esteya Unit

    International Nuclear Information System (INIS)

    Ibanez-Rosello, B; Bautista-Ballesteros, J; Bonaque, J; Lliso, F; Carmona, V; Gimeno, J; Ouhib, Z; Perez-Calatayud, J

    2016-01-01

    Purpose: A failure mode and effect analysis (FMEA) of skin lesions treatment process using Esteya™ device (Elekta Brachyterapy, Veenendaal, The Netherlands) was performed, with the aim of increasing the quality of the treatment and reducing the likelihood of unwanted events. Methods: A multidisciplinary team with experience in the treatment process met to establish the process map, which outlines the flow of various stages for such patients undergoing skin treatment. Potential failure modes (FM) were identified and the value of severity (S), frequency of occurrence (O), and lack of detectability (D) of the proposed FM were scored individually, each on a scale of 1 to 10 following TG-100 guidelines of the AAPM. These failure modes were ranked according to our risk priority number (RPN) and S scores. The efficiency of existing quality management tools was analyzed through a reassessment of the O and D made by consensus. Results: 149 FM were identified, 43 of which had RPN ≥ 100 and 30 had S ≥ 7. After introduction of the tools of quality management, only 3 FM had RPN ≥ 100 and 22 FM had RPN ≥ 50. These 22 FM were thoroughly analyzed and new tools for quality management were proposed. The most common cause of highest RPN FM was associated with the heavy patient workload and the continuous and accurate applicator-patient skin contact during the treatment. To overcome this second item, a regular quality control and setup review by a second individual before each treatment session was proposed. Conclusion: FMEA revealed some of the FM potentials that were not predicted during the initial implementation of the quality management tools. This exercise was useful in identifying the need of periodic update of the FMEA process as new potential failures can be identified.

  4. WE-H-BRC-01: Failure Mode and Effects Analysis of Skin Electronic Brachytherapy Using Esteya Unit

    Energy Technology Data Exchange (ETDEWEB)

    Ibanez-Rosello, B; Bautista-Ballesteros, J; Bonaque, J; Lliso, F; Carmona, V; Gimeno, J [Hospital La Fe, Valencia, Valencia (Spain); Ouhib, Z [Lynn Regional Cancer Center, Delray Beach, FL (United States); Perez-Calatayud, J [Hospital La Fe, Valencia, Valencia (Spain); Clinica Benidorm, Benidorm, Alicante (Spain)

    2016-06-15

    Purpose: A failure mode and effect analysis (FMEA) of skin lesions treatment process using Esteya™ device (Elekta Brachyterapy, Veenendaal, The Netherlands) was performed, with the aim of increasing the quality of the treatment and reducing the likelihood of unwanted events. Methods: A multidisciplinary team with experience in the treatment process met to establish the process map, which outlines the flow of various stages for such patients undergoing skin treatment. Potential failure modes (FM) were identified and the value of severity (S), frequency of occurrence (O), and lack of detectability (D) of the proposed FM were scored individually, each on a scale of 1 to 10 following TG-100 guidelines of the AAPM. These failure modes were ranked according to our risk priority number (RPN) and S scores. The efficiency of existing quality management tools was analyzed through a reassessment of the O and D made by consensus. Results: 149 FM were identified, 43 of which had RPN ≥ 100 and 30 had S ≥ 7. After introduction of the tools of quality management, only 3 FM had RPN ≥ 100 and 22 FM had RPN ≥ 50. These 22 FM were thoroughly analyzed and new tools for quality management were proposed. The most common cause of highest RPN FM was associated with the heavy patient workload and the continuous and accurate applicator-patient skin contact during the treatment. To overcome this second item, a regular quality control and setup review by a second individual before each treatment session was proposed. Conclusion: FMEA revealed some of the FM potentials that were not predicted during the initial implementation of the quality management tools. This exercise was useful in identifying the need of periodic update of the FMEA process as new potential failures can be identified.

  5. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  6. Availability and cost functions for periodically inspected preventively maintained units

    International Nuclear Information System (INIS)

    Vaurio, J.K.

    1999-01-01

    Unavailability and cost rate functions are developed for components whose failures can occur randomly but they are detected only by periodic testing or inspections. If a failure occurs between consecutive inspections, the unit remains failed until the next inspection. Components are renewed by preventive maintenance periodically, or by repair or replacement after a failure, whichever occurs first (age-replacement). The model takes into account finite repair and maintenance durations as well as costs due to testing, repair, maintenance and lost production or accidents. For normally operating units the time-related penalty is loss of production. For standby safety equipment it is the expected cost of an accident that can happen when the component is down due to a dormant failure, repair or maintenance. The objective of maintenance optimization is to minimize the total cost rate by proper selection of two intervals, one for inspections and one for replacements. General conditions and techniques are developed for solving optimal test and maintenance intervals, with and without constraints on the production loss or accident rate. Insights are gained into how the optimal intervals depend on various cost parameters and reliability characteristics

  7. Management of kyphoscoliosis patients with respiratory failure in the intensive care unit and during long term follow up

    Directory of Open Access Journals (Sweden)

    Adıgüzel Nalan

    2012-09-01

    Full Text Available Abstract Background We aimed to evaluate the ICU management and long-term outcomes of kyphoscoliosis patients with respiratory failure. Methods A retrospective observational cohort study was performed in a respiratory ICU and outpatient clinic from 2002–2011. We enrolled all kyphoscoliosis patients admitted to the ICU and followed-up at regular intervals after discharge. Reasons for acute respiratory failure (ARF, ICU data, mortality, length of ICU stay and outpatient clinic data, non-invasive ventilation (NIV device settings, and compliance were recorded. NIV failure in the ICU and the long term effect of NIV on pulmonary performance were analyzed. Results Sixty-two consecutive ICU kyphoscoliosis patients with ARF were enrolled in the study. NIV was initially applied to 55 patients, 11 (20% patients were intubated, and the majority had sepsis and septic shock (p  Conclusions We strongly discourage the use of NIV in the case of septic shock in ICU kyphoscoliosis patients with ARF. Pulmonary performance improved with NIV during long term follow up.

  8. Condition-based maintenance at both scheduled and unscheduled opportunities

    NARCIS (Netherlands)

    Kalosi, S.; Kapodistria, S.; Resing, J.A.C.

    2016-01-01

    Motivated by original equipment manufacturer (OEM) service and maintenance practices we consider a single component subject to replacements at failure instances and two types of preventive maintenance opportunities: scheduled, which occur due to periodic system reviews of the equipment, and

  9. Optimizing Maintenance of Constraint-Based Database Caches

    Science.gov (United States)

    Klein, Joachim; Braun, Susanne

    Caching data reduces user-perceived latency and often enhances availability in case of server crashes or network failures. DB caching aims at local processing of declarative queries in a DBMS-managed cache close to the application. Query evaluation must produce the same results as if done at the remote database backend, which implies that all data records needed to process such a query must be present and controlled by the cache, i. e., to achieve “predicate-specific” loading and unloading of such record sets. Hence, cache maintenance must be based on cache constraints such that “predicate completeness” of the caching units currently present can be guaranteed at any point in time. We explore how cache groups can be maintained to provide the data currently needed. Moreover, we design and optimize loading and unloading algorithms for sets of records keeping the caching units complete, before we empirically identify the costs involved in cache maintenance.

  10. A new modeling approach to the safety evaluation of N-modular redundant computer systems in presence of imperfect maintenance

    International Nuclear Information System (INIS)

    Flammini, Francesco; Marrone, Stefano; Mazzocca, Nicola; Vittorini, Valeria

    2009-01-01

    A large number of safety-critical control systems are based on N-modular redundant architectures, using majority voters on the outputs of independent computation units. In order to assess the compliance of these architectures with international safety standards, the frequency of hazardous failures must be analyzed by developing and solving proper formal models. Furthermore, the impact of maintenance faults has to be considered, since imperfect maintenance may degrade the safety integrity level of the system. In this paper, we present both a failure model for voting architectures based on Bayesian networks and a maintenance model based on continuous time Markov chains, and we propose to combine them according to a compositional multiformalism modeling approach in order to analyze the impact of imperfect maintenance on the system safety. We also show how the proposed approach promotes the reuse and the interchange of models as well the interchange of solving tools.

  11. Efforts to Reduce International Space Station Crew Maintenance Time in the Management of the Extravehicular Mobility Unit Transport Loop Water Quality

    Science.gov (United States)

    Etter,David; Rector, Tony; Boyle, robert; Zande, Chris Vande

    2012-01-01

    The EMU (Extravehicular Mobility Unit) contains a semi-closed-loop re-circulating water circuit (Transport Loop) to absorb heat into a LCVG (Liquid Coolant and Ventilation Garment) worn by the astronaut. A second, single-pass water circuit (Feed-water Loop) provides water to a cooling device (Sublimator) containing porous plates, and that water sublimates through the porous plates to space vacuum. The cooling effect from the sublimation of this water translates to a cooling of the LCVG water that circulates through the Sublimator. The quality of the EMU Transport Loop water is maintained through the use of a water processing kit (ALCLR - Airlock Cooling Loop Remediation) that is used to periodically clean and disinfect the water circuit. Opportunities to reduce crew time associated with ALCLR operations include a detailed review of the historical water quality data for evidence to support an extension to the implementation cycle. Furthermore, an EMU returned after 2-years of use on the ISS (International Space Station) is being used as a test bed to evaluate the results of extended and repeated ALCLR implementation cycles. Finally, design, use and on-orbit location enhancements to the ALCLR kit components are being considered to allow the implementation cycle to occur in parallel with other EMU maintenance and check-out activities, and to extend the life of the ALCLR kit components. These efforts are undertaken to reduce the crew-time and logistics burdens for the EMU, while ensuring the long-term health of the EMU water circuits for a post- Shuttle 6-year service life.

  12. Safety Management of a Clinical Process Using Failure Mode and Effect Analysis: Continuous Renal Replacement Therapies in Intensive Care Unit Patients.

    Science.gov (United States)

    Sanchez-Izquierdo-Riera, Jose Angel; Molano-Alvarez, Esteban; Saez-de la Fuente, Ignacio; Maynar-Moliner, Javier; Marín-Mateos, Helena; Chacón-Alves, Silvia

    2016-01-01

    The failure mode and effect analysis (FMEA) may improve the safety of the continuous renal replacement therapies (CRRT) in the intensive care unit. We use this tool in three phases: 1) Retrospective observational study. 2) A process FMEA, with implementation of the improvement measures identified. 3) Cohort study after FMEA. We included 54 patients in the pre-FMEA group and 72 patients in the post-FMEA group. Comparing the risks frequencies per patient in both groups, we got less cases of under 24 hours of filter survival time in the post-FMEA group (31 patients 57.4% vs. 21 patients 29.6%; p FMEA, there were several improvements in the management of intensive care unit patients receiving CRRT, and we consider it a useful tool for improving the safety of critically ill patients.

  13. Failure study of helium-cooled tungsten divertor plasma-facing units tested at DEMO relevant steady-state heat loads

    International Nuclear Information System (INIS)

    Ritz, G; Pintsuk, G; Linke, J; Hirai, T; Norajitra, P; Reiser, J; Giniyatulin, R; Makhankov, A; Mazul, I

    2009-01-01

    Tungsten was selected as armor material for the helium-cooled divertor in future DEMO-type fusion reactors and fusion power plants. After realizing the design and testing of them under cyclic thermal loads of up to ∼14 MW m -2 , the tungsten divertor plasma-facing units were examined by metallography; they revealed failures such as cracks at the thermal loaded and as-machined surfaces, as well as degradation of the brazing layers. Furthermore, in order to optimize the machining processes, the quality of tungsten surfaces prepared by turning, milling and using a diamond cutting wheel were examined. This paper presents a metallographic examination of the tungsten plasma-facing units as well as technical studies and the characterization on machining of tungsten and alternative brazing joints.

  14. Failure study of helium-cooled tungsten divertor plasma-facing units tested at DEMO relevant steady-state heat loads

    Science.gov (United States)

    Ritz, G.; Hirai, T.; Norajitra, P.; Reiser, J.; Giniyatulin, R.; Makhankov, A.; Mazul, I.; Pintsuk, G.; Linke, J.

    2009-12-01

    Tungsten was selected as armor material for the helium-cooled divertor in future DEMO-type fusion reactors and fusion power plants. After realizing the design and testing of them under cyclic thermal loads of up to ~14 MW m-2, the tungsten divertor plasma-facing units were examined by metallography; they revealed failures such as cracks at the thermal loaded and as-machined surfaces, as well as degradation of the brazing layers. Furthermore, in order to optimize the machining processes, the quality of tungsten surfaces prepared by turning, milling and using a diamond cutting wheel were examined. This paper presents a metallographic examination of the tungsten plasma-facing units as well as technical studies and the characterization on machining of tungsten and alternative brazing joints.

  15. Evaluation of the Implementation of an educational intervention nurse in patients treated at the Heart Failure Unit at the University Hospital Puerta de Hierro

    Directory of Open Access Journals (Sweden)

    Aurora Hernández Rivas

    2012-11-01

    Full Text Available Objective: To evaluate the effectiveness of the implementation of a nurse educational intervention in patients with heart failure in relation to the level of knowledge about their disease, level of self-care, treatment adherence, perceived satisfaction, fewer hospital readmissions and improved quality of life. Methods: Quasi-experimental study with two groups: control group (consisting of patients treated according to standard practice and experimental group (consisting of patients who will apply the nursing educational intervention proposal. It included all patients (= 18 years, good cognitive, literacy, sign informed consent with a diagnosis of heart failure (HF of recent (3-6 months or new onset, coming first in the Heart Failure Unit of Hospital Universitario Puerta de Hierro from May 2008. Sample: 68 patients per group. Nurse educational intervention will consist of four teaching sessions of 20 minutes before discharge, will be given a boost educational DVD, complete with brochures and explanatory guide, it will reinforce the information a month by telephone. Monitoring: baseline visit (inclusion and follow-up after 15 days, at 3 and 6 months. Outcomes/Instruments: demographic and clinical/exploration and medical history; quality of life, knowledge, self-care and medication adherence/validated questionnaires. Analysis: measures of central tendency and dispersion. Analysis by treatment assignment.

  16. Failure of action potential propagation in sensory neurons: mechanisms and loss of afferent filtering in C-type units after painful nerve injury.

    Science.gov (United States)

    Gemes, Geza; Koopmeiners, Andrew; Rigaud, Marcel; Lirk, Philipp; Sapunar, Damir; Bangaru, Madhavi Latha; Vilceanu, Daniel; Garrison, Sheldon R; Ljubkovic, Marko; Mueller, Samantha J; Stucky, Cheryl L; Hogan, Quinn H

    2013-02-15

    The T-junction of sensory neurons in the dorsal root ganglion (DRG) is a potential impediment to action potential (AP) propagation towards the CNS. Using intracellular recordings from rat DRG neuronal somata during stimulation of the dorsal root, we determined that the maximal rate at which all of 20 APs in a train could successfully transit the T-junction (following frequency) was lowest in C-type units, followed by A-type units with inflected descending limbs of the AP, and highest in A-type units without inflections. In C-type units, following frequency was slower than the rate at which AP trains could be produced in either dorsal root axonal segments or in the soma alone, indicating that the T-junction is a site that acts as a low-pass filter for AP propagation. Following frequency was slower for a train of 20 APs than for two, indicating that a cumulative process leads to propagation failure. Propagation failure was accompanied by diminished somatic membrane input resistance, and was enhanced when Ca(2+)-sensitive K(+) currents were augmented or when Ca(2+)-sensitive Cl(-) currents were blocked. After peripheral nerve injury, following frequencies were increased in axotomized C-type neurons and decreased in axotomized non-inflected A-type neurons. These findings reveal that the T-junction in sensory neurons is a regulator of afferent impulse traffic. Diminished filtering of AP trains at the T-junction of C-type neurons with axotomized peripheral processes could enhance the transmission of activity that is ectopically triggered in a neuroma or the neuronal soma, possibly contributing to pain generation.

  17. Grounds Maintenance Equipment and Procedures. Building Maintenance. Module VI. Instructor's Guide.

    Science.gov (United States)

    Crank, Virgil

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for two units on grounds maintenance equipment and procedures. The first unit deals with grounds maintenance equipment and includes the following lessons: safety; changing oil/filter…

  18. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  19. Reliability Centered Maintenance - Methodologies

    Science.gov (United States)

    Kammerer, Catherine C.

    2009-01-01

    Journal article about Reliability Centered Maintenance (RCM) methodologies used by United Space Alliance, LLC (USA) in support of the Space Shuttle Program at Kennedy Space Center. The USA Reliability Centered Maintenance program differs from traditional RCM programs because various methodologies are utilized to take advantage of their respective strengths for each application. Based on operational experience, USA has customized the traditional RCM methodology into a streamlined lean logic path and has implemented the use of statistical tools to drive the process. USA RCM has integrated many of the L6S tools into both RCM methodologies. The tools utilized in the Measure, Analyze, and Improve phases of a Lean Six Sigma project lend themselves to application in the RCM process. All USA RCM methodologies meet the requirements defined in SAE JA 1011, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes. The proposed article explores these methodologies.

  20. Failure analysis of the Ringhals unit 3 EDM surfaces removed from the RPV outlet nozzle to safe end weld

    International Nuclear Information System (INIS)

    Efsing, Pal; Embring, Goeran; Forssgren, Bjoern; Kroes, Bert; Lundstroem, Roger

    2006-09-01

    During the 2000 RFO (Re-Fueling Outage) In-Service Inspection of the nozzle to safe end weld of the Hot Leg Reactor Pressure Vessel Nozzles in Ringhals 3 and 4, axially oriented defects in the Alloy 182 weld metal were detected. In the case of Ringhals 3, the defects were initially considered as being embedded and thus left for future consideration, whereas the defects in Ringhals 4 were judged as being surface breaking and removed by EDM (Electro Discharge Machining). During the RFO 2001, the defects in Ringhals 3 were also removed by EDM without applying any surface treatment subsequent to the sampling. The cavities were inspected using a standard ET technique for manufacturing control before the plant was allowed to return to service. After one cycle of operation, the cavities resulting from the boat sampling were inspected by ET and UT techniques and indications of renewed, shallow cracking were identified. The indications were pre-dominantly axially oriented, of limited depth and with surface breaking lengths varying from 4 to 18 mm. To investigate the cause of this cracking, it was decided to remove a second series of small boat samples from the areas with indications, prior to implementation of a permanent repair. To minimize the impact on the RFO schedule and the material loss that would have resulted from EDM boat sample removal, mini samples were removed manually, using a small axial grinder. The sampling was performed after nozzle decontamination and used a dry nozzle access system that had been specifically developed for the nozzle repair. The sample removal was completed in approximately two hours and a total of three samples were shipped to the Studsvik hot cell laboratories for failure analysis. The failure analysis revealed a typical surface morphology, resulting from the EDM process and confirmed that numerous micro-fissures may result from the process if it is utilized without proper optimization and care. On one of the boat samples, surface areas

  1. Contracting, An Alarming Trend in Aviation Maintenance

    National Research Council Canada - National Science Library

    Brooke, J

    1998-01-01

    .... Aviation operational and maintenance units struggle to balance peacetime requirements for general military and technical training, organization and installation support, training and operational...

  2. Managing and controlling maintenance

    International Nuclear Information System (INIS)

    Chavez, G.; Perla, H.F.

    1980-01-01

    A well-planned maintenance-management program can bring organized yet flexible scheduling, improved productivity, and a ready-access data bank. The system detailed in the article, developed for a nuclear power plant, has application to any equipment-intensive facility. Key features of the system include: documentation of all work requirements and their completion; automated prioritizing of work orders; automatic generation of work orders for repetitive work, when due; work lists in priority sequence; deferred, standby, and outage work reports; labor and work-order backlog information; equipment work histories and cumulative failure data

  3. Payload maintenance cost model for the space telescope

    Science.gov (United States)

    White, W. L.

    1980-01-01

    An optimum maintenance cost model for the space telescope for a fifteen year mission cycle was developed. Various documents and subsequent updates of failure rates and configurations were made. The reliability of the space telescope for one year, two and one half years, and five years were determined using the failure rates and configurations. The failure rates and configurations were also used in the maintenance simulation computer model which simulate the failure patterns for the fifteen year mission life of the space telescope. Cost algorithms associated with the maintenance options as indicated by the failure patterns were developed and integrated into the model.

  4. Textiles, Guano and Railroads: The Role of the United States in the Early Development Failures of Peru, 1818-1876

    OpenAIRE

    Bollinger, William

    2012-01-01

    Peru's importance to the United States in the nineteenth century has been underappreciated because there were few instances of sharp conflict between the two nations. But, beginning with U.S. export of coarse cloth from new cotton mills just after Peruvian independence, continuing during the influence of Peruvian guano on U.S. "scientific agriculture," and then in the period of Peru's extraordinary effort to build trans-Andean railways, Peru exercised important influence on U.S. economy and ...

  5. Statistical inference for imperfect maintenance models with missing data

    International Nuclear Information System (INIS)

    Dijoux, Yann; Fouladirad, Mitra; Nguyen, Dinh Tuan

    2016-01-01

    The paper considers complex industrial systems with incomplete maintenance history. A corrective maintenance is performed after the occurrence of a failure and its efficiency is assumed to be imperfect. In maintenance analysis, the databases are not necessarily complete. Specifically, the observations are assumed to be window-censored. This situation arises relatively frequently after the purchase of a second-hand unit or in the absence of maintenance record during the burn-in phase. The joint assessment of the wear-out of the system and the maintenance efficiency is investigated under missing data. A review along with extensions of statistical inference procedures from an observation window are proposed in the case of perfect and minimal repair using the renewal and Poisson theories, respectively. Virtual age models are employed to model imperfect repair. In this framework, new estimation procedures are developed. In particular, maximum likelihood estimation methods are derived for the most classical virtual age models. The benefits of the new estimation procedures are highlighted by numerical simulations and an application to a real data set. - Highlights: • New estimation procedures for window-censored observations and imperfect repair. • Extensions of inference methods for perfect and minimal repair with missing data. • Overview of maximum likelihood method with complete and incomplete observations. • Benefits of the new procedures highlighted by simulation studies and real application.

  6. Remote maintenance development, July 1975--July 1976

    International Nuclear Information System (INIS)

    Fletcher, R.D.

    1977-04-01

    The results of the second year's efforts on remote handling development and studies for remote maintenance of failure-prone areas of the New Waste Calcining Facility (NWCF) are presented. Test arrangements and results for specific viewing situations and component remote installation and removal in the Remote Maintenance Development Facility (RMDF) and component material evaluations are discussed

  7. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  8. Machinery prognostics and prognosis oriented maintenance management

    CERN Document Server

    Yan, Jihong

    2014-01-01

    This book gives a complete presentatin of the basic essentials of machinery prognostics and prognosis oriented maintenance management, and takes a look at the cutting-edge discipline of intelligent failure prognosis technologies for condition-based maintenance.  Latest research results and application methods are introduced for signal processing, reliability moelling, deterioration evaluation, residual life prediction and maintenance-optimization as well as applications of these methods.

  9. PFP MICON maintenance manual. Revision 1

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1995-01-01

    This manual covers the use of maintenance displays, maintenance procedures, system alarms and common system failures. This manual is intended to supplement the MICON maintenance training not replace it. It also assumes that the user is familiar with the normal operation of the MICON A/S system. The MICON system is a distributed control computer and, among other things, controls the HVAC system for the Plutonium Finishing Plant

  10. Maintenance, a global approach

    International Nuclear Information System (INIS)

    Calmejane, P.

    2001-01-01

    Maintenance is an important economic activity, it can represent up to 40% of operating costs in some fabrication units. The opening of energy markets to competition has led main operators to center their activities on their basis business and to sub-contract subsidiary activities. Subcontracting with strong engagements from the sub-contractor about results, time allowed and costs is now currently applied in nuclear industry. (A.C.)

  11. The utilization of performance evaluation instruments by technical trainers to evaluate maintenance personnel in the nuclear power industry in the United States

    International Nuclear Information System (INIS)

    Hornberger, C.K.

    1993-01-01

    The purpose of this study was to document the utilization of performance evaluation instruments by technical trainers in the evaluation of maintenance personnel in US nuclear power plants. Performance evaluation of maintenance personnel has been identified by nuclear utilities and the Nuclear Regulatory Commission as the only acceptable method of determining worker competence. The NRC requires performance evaluation to be conducted to performance standards, but it does not specify the standards or the method to be utilized. Each plant is free to establish its own standards and methods of evaluation. This was a descriptive study utilizing descriptive statistics for the analysis of the data. The subjects included 655 maintenance trainers in 72 US nuclear plants. Conclusions of the study include: (1) Technical trainers are in compliance with NRC regulations. (2) Evaluation materials developed by the Institute of Nuclear Power Operations are used by technical trainers in every one of the 62 plants that responded. (3) In-plant or self-developed Performance Evaluation Instruments are utilized by 419 or 95.2% of the technical trainers. (4) Technical trainers incorporate nine common components into their Performance Evaluation Instruments. (5) Technical trainers evaluate maintenance processes and the product produced by workers when following procedures and specifications are critical and when safety hazards are involved. (6) Technical trainers believe that utilizing Performance Evaluation Instruments makes their job easier by providing documentation about the quality and standards of maintenance skills. (7) Technical trainers believe that maintenance workers benefit when their skills are assessed through the use of Performance Evaluation Instruments

  12. WWER identification and analysis of dominant factors affecting the fuel failure rates in WWER-1000 units in Czech Republic, Bulgaria, Ukraine and Russia

    International Nuclear Information System (INIS)

    Evdokimov, I.; Likhanskii, V.; Afanasieva, E.; Kanukova, V.; Kozhakin, A.; Maslova, L.; Chernetskiy, M.; Zborovskii, V.; Sorokin, A.

    2015-01-01

    The paper reviews the major findings of the study in the frame of the “Zero Failure Rate” project for WWER. The study included analysis and systematization of available data on leaking fuel assemblies found in 2003 through 2014 in WWER-1000 nuclear units in Russia, Ukraine, Czech Republic and Bulgaria. The study was intended to be used in preparation of recommendations and elaboration of corrective measures for enhancement of reliability and decrease of the failure rates for the WWER-1000 fuel. One of the key areas in successful implementation of the industry ‘zero failure’ goal is a challenge of significant increase of inspections of WWER-1000 fuel assemblies. It may be reasonable (with account taken for international experience) to think of development of more effective equipment for prompt fuel inspections & repair in WWER-1000 spent fuel pool. Another challenge is the elaboration of unified fuel inspection guidelines to ensure that limited industry resources are spent in the most productive way. In the frame of this work it may be helpful to implement in practice the criteria for safe removal of defective fuel rods from the leaking FA under repair

  13. Hubungan antara Rasio Neutrofil-Limfosit dan Skor Sequencial Organ Failure Assesment pada Pasien yang Dirawat di Ruang Intensive Care Unit

    Directory of Open Access Journals (Sweden)

    Adi Nugroho

    2013-12-01

    Full Text Available Physiological response of immune system against systemic inflammation involves an increased level of neutrophils and a reduction of lymphocyte or an increase of neutrophil-lymphocyte ratio (RNL. The aim of this study was to identify the relationship between systemic inflammation, characterized by increasing in RNL on organ malfunction, assessed by Sequential Organ Failure Assessment (SOFA score in Intensive Care Unit (ICU patients. This study was a observational study with cross sectional design. This study was conducted by observing RNL and SOFA score at 0, 24th and 48th hour of 78 patients treated in the ICU Dr. Hasan Sadikin General Hospital Bandung in December 2012–February 2013. Patients were divided into 3 categories of sepsis A, B and C. This study showed that there was a relationship between RNL, SOFA scores and sepsis categories (p<0.001. Pearson Correlation Test showed that there was relationship between RNL and SOFA scores (p<0.05, R= 0.63. In conclusion, there is a relationship between systemic inflammatory condition, characterized by RNL and organ failure, characterized by the SOFA score, in patients treated in the ICU Dr. Hasan Sadikin General Hospital Bandung

  14. Reliability-centered maintenance for ground-based large optical telescopes and radio antenna arrays

    Science.gov (United States)

    Marchiori, G.; Formentin, F.; Rampini, F.

    2014-07-01

    the logic is completed for all the analyzed items, the resulting Maintenance Program is compiled in order to preserve all the system important functions and to rationalize the tasks periodicities. Lastly, the RCM is kept alive throughout the entire life of the telescope, where the effectiveness of the maintenance is constantly reviewed and adjusted on the basis of the "lesson learned". In addition to the RCM analysis methodology, a second basic concept is applied for the telescope maintenance: to design and install components in such a manner to restore a failure and to perform servicing procedures as close as possible to the telescope, maximizing the replacement of Line Replaceable Units (LRUs) or Shop Replaceable Units (SRUs), rather than repair on-equipment.

  15. A Grounded Theory Study of Aircraft Maintenance Technician Decision-Making

    Science.gov (United States)

    Norcross, Robert

    Aircraft maintenance technician decision-making and actions have resulted in aircraft system errors causing aircraft incidents and accidents. Aircraft accident investigators and researchers examined the factors that influence aircraft maintenance technician errors and categorized the types of errors in an attempt to prevent similar occurrences. New aircraft technology introduced to improve aviation safety and efficiency incur failures that have no information contained in the aircraft maintenance manuals. According to the Federal Aviation Administration, aircraft maintenance technicians must use only approved aircraft maintenance documents to repair, modify, and service aircraft. This qualitative research used a grounded theory approach to explore the decision-making processes and actions taken by aircraft maintenance technicians when confronted with an aircraft problem not contained in the aircraft maintenance manuals. The target population for the research was Federal Aviation Administration licensed aircraft and power plant mechanics from across the United States. Nonprobability purposeful sampling was used to obtain aircraft maintenance technicians with the experience sought in the study problem. The sample population recruitment yielded 19 participants for eight focus group sessions to obtain opinions, perceptions, and experiences related to the study problem. All data collected was entered into the Atlas ti qualitative analysis software. The emergence of Aircraft Maintenance Technician decision-making themes regarding Aircraft Maintenance Manual content, Aircraft Maintenance Technician experience, and legal implications of not following Aircraft Maintenance Manuals surfaced. Conclusions from this study suggest Aircraft Maintenance Technician decision-making were influenced by experience, gaps in the Aircraft Maintenance Manuals, reliance on others, realizing the impact of decisions concerning aircraft airworthiness, management pressures, and legal concerns

  16. Environmental assessment of radiological effluents from data gathering and maintenance operation on Three Mile Island Unit 2: interim criteria approved by the Commission on April 7,1980

    International Nuclear Information System (INIS)

    1980-05-01

    The staff is currently in the process of preparing a programmatic environmental impact statement (PEIS) for TMI-2 which will address all radiological releases that may occur as a result of the cleanup and recovery operations. These operations will begin after the PEIS is published in final form provided the proposed cleanup programs have been found to be environmentally acceptable. In the interim period it is necessary for the licensee to conduct data gathering and maintenance operations on the damaged reactor. The action of approval of these interim operations does not foreclose any of the options of the PEIS. In addition, regardless of what cleanup choice is made in the PEIS, the approval of these data gathering and maintenance operations enhance the ability of the licensee to maintain the reactor in a safe configuration and to plan effectively for recovery operations. This Environmental Impact Appraisal evaluates the effects on the environment of allowing these data gathering and maintenance operations to be conducted. These data gathering and maintenance operations do not include purging of the containment atmosphere, disposal of EPICOR-II water, or the treatment and disposal of high level radioactively contaminated water in the reactor building

  17. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XXI, I--MAINTAINING THE AIR SYSTEM--CATERPILLAR DIESEL ENGINE, II--UNDERSTANDING REAR END SUSPENSION.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE AIR SYSTEM AND REAR AXLE SUSPENSION USED ON DIESEL POWERED VEHICLES. TOPICS ARE (1) AIR INDUCTION AND EXHAUST SYSTEM, (2) VALVE MECHANISM, (3) TROUBLESHOOTING THE AIR SYSTEM, (4) PURPOSE OF VEHICLE SUSPENSION, (5) TANDEM…

  18. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XXIII, I--MAINTAINING THE FUEL SYSTEM, PART II--CATERPILLAR DIESEL ENGINE, II--UNDERSTANDING STEERING SYSTEMS.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL INJECTION SYSTEM AND THE STEERING SYSTEM OF DIESEL POWERED VEHICLES. TOPICS ARE FUEL INJECTION SECTION, AND DESCRIPTION OF THE STEERING SYSTEM. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING…

  19. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XIII, I--MAINTAINING THE FUEL SYSTEM (PART III), CUMMINS DIESEL ENGINES, II--RADIATOR SHUTTER SYSTEM.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE CONSTRUCTION, OPERATION, AND MAINTENANCE OF THE DIESEL ENGINE FUEL AND RADIATOR SHUTTER SYSTEMS. TOPICS ARE (1) MORE ABOUT THE CUMMINS FUEL SYSTEM, (2) CALIBRATING THE PT FUEL PUMP, (3) CALIBRATING THE FUEL INJECTORS, (4) UNDERSTANDING THE SHUTTER SYSTEM, (5) THE…

  20. An integrated production, inventory and preventive maintenance model for a multi-product production system

    International Nuclear Information System (INIS)

    Liu, Xuejuan; Wang, Wenbin; Peng, Rui

    2015-01-01

    This paper considers a production system that can produce multiple products alternately. Products go through the system in a sequence and a complete run of all products forms a production cycle. An integrated production, inventory and preventive maintenance model is constructed, which is characterized by the delay-time concept. Two different situations are studied based on whether the unqualified products and downtime caused by the failures of the system, set-up and preventive maintenance can be ignored or not. Three cases are considered for each situation, depending on the position of the preventive maintenance epochs: the first case, where preventive maintenance is carried out at the end of each production cycle; the second case, where preventive maintenance is carried out at each set-up time of the products; and the third case, where preventive maintenance is carried out at some set-up times only, since it may not always be optimal to carry out preventive maintenance at the end of the production cycle or at each set-up time. The modeling objectives are to find the optimal number of production cycles per year and the optimal position of preventive maintenance that will maximize the expected profit per unit time. Numerical examples, using real data, are presented to illustrate the model. - Highlights: • We propose an integrated economic production quantity and preventive maintenance model. • The situation that multiple products are produced on the same system alternately is studied. • Two situations are studied based on whether the downtime and the product quality can be ignored or not. • We use enumeration method and analytical method to select the optimal preventive maintenance policy, respectively. • We use the delay-time concept to model the preventive maintenance policy

  1. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  2. Central oxygen pipeline failure

    African Journals Online (AJOL)

    surgical intensive care unit (ICU), with two patients on full ventilation and ... uncertainty around the cause of the failure and the restoration, .... soon as its level also falls below three tons. Should ... (properly checked and closed prior to each anaesthetic). ... in use at the time of the central oxygen pipeline failure at Tygerberg.

  3. Network maintenance

    CERN Multimedia

    GS Department

    2009-01-01

    A site-wide network maintenance operation has been scheduled for Saturday 28 February. Most of the network devices of the general purpose network will be upgraded to a newer software version, in order to improve our network monitoring capabilities. This will result in a series of short (2-5 minutes) random interruptions everywhere on the CERN sites throughout the day. This upgrade will not affect the Computer Centre itself, Building 613, the Technical Network and the LHC experiments, dedicated networks at the pits. For further details of this intervention, please contact Netops by phone 74927 or e-mail mailto:Netops@cern.ch. IT/CS Group

  4. Network maintenance

    CERN Multimedia

    IT Department

    2009-01-01

    A site wide network maintenance has been scheduled for Saturday 28 February. Most of the network devices of the General Purpose network will be upgraded to a newer software version, in order to improve our network monitoring capabilities. This will result in a series of short (2-5 minutes) random interruptions everywhere on the CERN sites along this day. This upgrade will not affect: the Computer centre itself, building 613, the Technical Network and the LHC experiments dedicated networks at the pits. Should you need more details on this intervention, please contact Netops by phone 74927 or email mailto:Netops@cern.ch. IT/CS Group

  5. Application of reliability-centered maintenance to boiling water reactor emergency core cooling systems fault-tree analysis

    International Nuclear Information System (INIS)

    Choi, Y.A.; Feltus, M.A.

    1995-01-01

    Reliability-centered maintenance (RCM) methods are applied to boiling water reactor plant-specific emergency core cooling system probabilistic risk assessment (PRA) fault trees. The RCM is a technique that is system function-based, for improving a preventive maintenance (PM) program, which is applied on a component basis. Many PM programs are based on time-directed maintenance tasks, while RCM methods focus on component condition-directed maintenance tasks. Stroke time test data for motor-operated valves (MOVs) are used to address three aspects concerning RCM: (a) to determine if MOV stroke time testing was useful as a condition-directed PM task; (b) to determine and compare the plant-specific MOV failure data from a broad RCM philosophy time period compared with a PM period and, also, compared with generic industry MOV failure data; and (c) to determine the effects and impact of the plant-specific MOV failure data on core damage frequency (CDF) and system unavailabilities for these emergency systems. The MOV stroke time test data from four emergency core cooling systems [i.e., high-pressure coolant injection (HPCI), reactor core isolation cooling (RCIC), low-pressure core spray (LPCS), and residual heat removal/low-pressure coolant injection (RHR/LPCI)] were gathered from Philadelphia Electric Company's Peach Bottom Atomic Power Station Units 2 and 3 between 1980 and 1992. The analyses showed that MOV stroke time testing was not a predictor for eminent failure and should be considered as a go/no-go test. The failure data from the broad RCM philosophy showed an improvement compared with the PM-period failure rates in the emergency core cooling system MOVs. Also, the plant-specific MOV failure rates for both maintenance philosophies were shown to be lower than the generic industry estimates

  6. Maintenance cost models in deregulated power systems under opportunity costs

    International Nuclear Information System (INIS)

    Al-Arfaj, K.; Dahal, K.; Azaiez, M.N.

    2007-01-01

    In a centralized power system, the operator is responsible for scheduling maintenance. There are different types of maintenance, including corrective maintenance; predictive maintenance; preventive maintenance; and reliability-centred maintenance. The main cause of power failures is poor maintenance. As such, maintenance costs play a significant role in deregulated power systems. They include direct costs associated with material and labor costs as well as indirect costs associated with spare parts inventory, shipment, test equipment, indirect labor, opportunity costs and cost of failure. In maintenance scheduling and planning, the cost function is the only component of the objective function. This paper presented the results of a study in which different components of maintenance costs were modeled. The maintenance models were formulated as an optimization problem with single and multiple objectives and a set of constraints. The maintenance costs models could be used to schedule the maintenance activities of power generators more accurately and to identify the best maintenance strategies over a period of time as they consider failure and opportunity costs in a deregulated environment. 32 refs., 4 tabs., 4 figs

  7. Managing Postoperative Analgesic Failure: Tramadol Versus Morphine for Refractory Pain in the Post-Operative Recovery Unit.

    Science.gov (United States)

    Byrne, Kelly; Nolan, Aoife; Barnard, John; Tozer, Megan; Harris, David; Sleigh, Jamie

    2017-02-01

    This study aimed to discover whether co-analgesia with tramadol or additional morphine was more effective for patients who still had severe pain despite being given 10 mg intravenous morphine in the post-anesthesia care unit (PACU). All eligible patients were consented and recruited to the trial pre-operatively, but only a small subgroup – whose pain was not successfully controlled (pain score 6/10 or more) after receiving 10 mg of morphine in the PACU—were then randomized to enter the trial and receive, in a double blinded fashion, the analgesic study drug; which consisted of either a further 10 mg of morphine, or 100 mg of tramadol, titrated intravenously to control their pain. The groups were compared as to: the time to readiness for discharge, the patient’s pain scores over time, and the presence of side effects. There was no statistically significant difference in any of the outcomes measured. The time to readiness for discharge from PACU was 119 minutes in the morphine group and 120 minutes in the tramadol group. However in approximately half the cases who entered the trial (i.e., where pain had not been controlled with the pre-enrollment baseline 10 mg of morphine in PACU) neither a further 10 mg of morphine nor 100 mg of tramadol effectively relieved the patient’s pain. We found no difference between additional morphine and co-analgesia with tramadol in this study. Patients who don’t respond to reasonable doses of opioids in PACU are very likely to be unresponsive to further opioids, and other non-opioid analgesic techniques (such as regional anesthesia) should be considered early in this group of patients.

  8. Reliability centered maintenance applied to gas turbines, a deeper methodological study; Optimisation de la maintenance par la fiabilite appliquee aux turbines a combustion: approfondissement methodologique

    Energy Technology Data Exchange (ETDEWEB)

    Despujols, A; Delbos, J P; Zuliani, G

    1996-12-31

    The 9000E`combustion turbine study is unique in that it applied he RCM procedure to a power station before construction had begun on it. This has resulted in a maintenance programme being determined from the outset, rather than an existing programme being improved. The analysis begins with a search of the functions required by the unit, its operating states and its failure modes, then moves on to look at different systems to establish functional trees followed by failure trees. The lowest leaves on these graphs correspond respectively to functions carried out by important equipment nd their failure modes. Following on from this hierarchical procedure, each of the items of equipment are studies in an analysis of the failures modes, their effects and their criticality. The absence of feedback on this machine, the lack of data on the technology and the small size of the equipment (by comparison with those encountered in a nuclear unit), all contribute to limiting the level of decomposition. Tables are thus obtained which show the failure modes of an item of equipment, their origin, their effects on a system and unit level, the potential damage they cause, their severity, expert estimates of the frequency with they are likely to appear, their criticality and their evidence. The next step is a crucial one since it produces the results expected from the previous stages. It relies on task selection logic which has been honed to better take account of the obvious or hidden character of the failures. Not only must preventive operations to stop critical failure modes from occurring be suggested, but certain operations must be prescribed in order for breakdowns to be revealed. In practice, the state of the redundant or protective equipment has to be known when some of their failure modes remain hidden from the operator. The risk of a double failure with serious consequences becomes a probability when their breakdown state is not detected. (authors) 15 refs.

  9. Reliability centered maintenance applied to gas turbines, a deeper methodological study; Optimisation de la maintenance par la fiabilite appliquee aux turbines a combustion: approfondissement methodologique

    Energy Technology Data Exchange (ETDEWEB)

    Despujols, A.; Delbos, J.P.; Zuliani, G.

    1995-12-31

    The 9000E`combustion turbine study is unique in that it applied he RCM procedure to a power station before construction had begun on it. This has resulted in a maintenance programme being determined from the outset, rather than an existing programme being improved. The analysis begins with a search of the functions required by the unit, its operating states and its failure modes, then moves on to look at different systems to establish functional trees followed by failure trees. The lowest leaves on these graphs correspond respectively to functions carried out by important equipment nd their failure modes. Following on from this hierarchical procedure, each of the items of equipment are studies in an analysis of the failures modes, their effects and their criticality. The absence of feedback on this machine, the lack of data on the technology and the small size of the equipment (by comparison with those encountered in a nuclear unit), all contribute to limiting the level of decomposition. Tables are thus obtained which show the failure modes of an item of equipment, their origin, their effects on a system and unit level, the potential damage they cause, their severity, expert estimates of the frequency with they are likely to appear, their criticality and their evidence. The next step is a crucial one since it produces the results expected from the previous stages. It relies on task selection logic which has been honed to better take account of the obvious or hidden character of the failures. Not only must preventive operations to stop critical failure modes from occurring be suggested, but certain operations must be prescribed in order for breakdowns to be revealed. In practice, the state of the redundant or protective equipment has to be known when some of their failure modes remain hidden from the operator. The risk of a double failure with serious consequences becomes a probability when their breakdown state is not detected. (authors) 15 refs.

  10. [Development of Hospital Equipment Maintenance Information System].

    Science.gov (United States)

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  11. A review of planning models for maintenance and production.

    NARCIS (Netherlands)

    G. Budai-Balke (Gabriella); R. Dekker (Rommert); R.P. Nicolai (Robin)

    2006-01-01

    textabstractIn this article we give an overview of the relation between planning of maintenance and production. On the one hand we consider production planning and scheduling models in which failures and maintenance aspects are taken into account. Next we discuss the planning of maintenance

  12. Comparative evaluation of maintenance performance using subsurvival functions

    DEFF Research Database (Denmark)

    Paulsen, J.L.; Cooke, R.; Nyman, R.

    1997-01-01

    Subsurvival functions are applied to operational data for the control rod drive systems of Nordic nuclear reactors to evaluate maintenance performance. Competing failure modes are preventive and corrective maintenance. Maintenance indicators are defined and evaluated for 8 plants. (C) 1997 Elsevier...

  13. Implementation of the maintenance rule in Spain the PSA role

    International Nuclear Information System (INIS)

    Gerez, L.; Coello, A.

    2000-01-01

    The 10CFR50, 65 (Maintenance Rule) requires commercial nuclear power plant licensees to monitor the effectiveness of maintenance activities for safety important plant equipment in order to minimise the likelihood of failures and events caused by the lack of effective maintenance. (Author)

  14. 49 CFR 234.105 - Activation failure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Activation failure. 234.105 Section 234.105... of Warning System Malfunction § 234.105 Activation failure. Upon receipt of a credible report of warning system malfunction involving an activation failure, a railroad having maintenance responsibility...

  15. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    Energy Technology Data Exchange (ETDEWEB)

    Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J. [Brookhaven National Lab., Upton, NY (United States)

    1993-12-01

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

  16. Maintenance Cycle Extension in the IRIS Advanced Light Water Reactor Plant Design

    International Nuclear Information System (INIS)

    Galvin, Mark R.; Todreas, Neil E.; Conway, Larry E.

    2003-01-01

    New nuclear power generation in the United States will be realized only if the economic performance can be made competitive with other methods of electrical power generation. The economic performance of a nuclear power plant can be significantly improved by increasing the time spent on-line generating electricity relative to the time spent off-line conducting maintenance and refueling. Maintenance includes planned actions (surveillances) and unplanned actions (corrective maintenance) to respond to component degradation or failure. A methodology is described that can be used to resolve, in the design phase, maintenance-related operating cycle length barriers. A primary goal was to demonstrate the applicability and utility of the methodology in the context of the International Reactor, Innovative and Secure (IRIS) design. IRIS is an advanced light water nuclear power plant that is being designed to maximize this on-line generating time by increasing the operating cycle length. This is consequently a maintenance strategy paper using the IRIS plant as the example.Potential IRIS operating cycle length maintenance-related barriers, determined by modification of an earlier operating pressurized water reactor (PWR) plant cycle length analysis to account for differences between the design of IRIS and this operating PWR, are presented. The proposed methodology to resolve these maintenance-related barriers by the design process is described. The results of applying the methodology to two potential IRIS cycle length barriers, relief valve testing and emergency heat removal system testing, are presented

  17. Value maximizing maintenance policies under general repair

    International Nuclear Information System (INIS)

    Marais, Karen B.

    2013-01-01

    One class of maintenance optimization problems considers the notion of general repair maintenance policies where systems are repaired or replaced on failure. In each case the optimality is based on minimizing the total maintenance cost of the system. These cost-centric optimizations ignore the value dimension of maintenance and can lead to maintenance strategies that do not maximize system value. This paper applies these ideas to the general repair optimization problem using a semi-Markov decision process, discounted cash flow techniques, and dynamic programming to identify the value-optimal actions for any given time and system condition. The impact of several parameters on maintenance strategy, such as operating cost and revenue, system failure characteristics, repair and replacement costs, and the planning time horizon, is explored. This approach provides a quantitative basis on which to base maintenance strategy decisions that contribute to system value. These decisions are different from those suggested by traditional cost-based approaches. The results show (1) how the optimal action for a given time and condition changes as replacement and repair costs change, and identifies the point at which these costs become too high for profitable system operation; (2) that for shorter planning horizons it is better to repair, since there is no time to reap the benefits of increased operating profit and reliability; (3) how the value-optimal maintenance policy is affected by the system's failure characteristics, and hence whether it is worthwhile to invest in higher reliability; and (4) the impact of the repair level on the optimal maintenance policy. -- Highlights: •Provides a quantitative basis for maintenance strategy decisions that contribute to system value. •Shows how the optimal action for a given condition changes as replacement and repair costs change. •Shows how the optimal policy is affected by the system's failure characteristics. •Shows when it is

  18. Variation in critical care unit admission rates and outcomes for patients with acute coronary syndromes or heart failure among high- and low-volume cardiac hospitals.

    Science.gov (United States)

    van Diepen, Sean; Bakal, Jeffrey A; Lin, Meng; Kaul, Padma; McAlister, Finlay A; Ezekowitz, Justin A

    2015-02-27

    Little is known about cross-hospital differences in critical care units admission rates and related resource utilization and outcomes among patients hospitalized with acute coronary syndromes (ACS) or heart failure (HF). Using a population-based sample of 16,078 patients admitted to a critical care unit with a primary diagnosis of ACS (n=14,610) or HF (n=1467) between April 1, 2003 and March 31, 2013 in Alberta, Canada, we stratified hospitals into high (>250), medium (200 to 250), or low (<200) volume based on their annual volume of all ACS and HF hospitalization. The percentage of hospitalized patients admitted to critical care units varied across low, medium, and high-volume hospitals for both ACS and HF as follows: 77.9%, 81.3%, and 76.3% (P<0.001), and 18.0%, 16.3%, and 13.0% (P<0.001), respectively. Compared to low-volume units, critical care patients with ACS and HF admitted to high-volume hospitals had shorter mean critical care stays (56.6 versus 95.6 hours, P<0.001), more critical care procedures (1.9 versus 1.2 per patient, <0.001), and higher resource-intensive weighting (2.8 versus 1.5, P<0.001). No differences in in-hospital mortality (5.5% versus 6.2%, adjusted odds ratio 0.93; 95% CI, 0.61 to 1.41) were observed between high- and low-volume hospitals; however, 30-day cardiovascular readmissions (4.6% versus 6.8%, odds ratio 0.77; 95% CI, 0.60 to 0.99) and cardiovascular emergency-room visits (6.6% versus 9.5%, odds ratio 0.80; 95% CI, 0.69 to 0.94) were lower in high-volume compared to low-volume hospitals. Outcomes stratified by ACS or HF admission diagnosis were similar. Cardiac patients hospitalized in low-volume hospitals were more frequently admitted to critical care units and had longer hospitals stays despite lower resource-intensive weighting. These findings may provide opportunities to standardize critical care utilization for ACS and HF patients across high- and low-volume hospitals. © 2015 The Authors. Published on behalf of the American

  19. Maintenance - a design perspective

    International Nuclear Information System (INIS)

    Hedges, K.R.

    1992-01-01

    The paper describes how the CANDU-3 has incorporated, at the design stage, maintenance requirements such as component accessibility, standardization, ease of replacement, reduction in the number of components, and simplified component design. AECL is also active in the planned rehabilitation of the four units at Ontario Hydro's Bruce A nuclear generating station. In addition to conceptual design and development, detailed design and analysis, procurement and site assistance, AECL's Sheridan Park Laboratory will provide important development and mockup facilities. An AECL research and development program on reactor maintenance includes the identification and characterization of aging and degrading mechanisms, the tailoring of developed products to plant requirements, and the identification of areas of international cooperation and information exchange. 3 tabs., 1 fig

  20. Maintenance optimization for subsea oil pipelines

    International Nuclear Information System (INIS)

    Castanier, Bruno; Rausand, Marvin

    2006-01-01

    In this paper, the classical PF interval model, proposed for reliability centered maintenance, is used to optimize the preventive replacement policy of a subsea oil pipeline. The pipeline is subject to failure modes that may lead to oil release and pollution of the sea. The proposed replacement policy is based on regular condition measurements of the quality of an internal pipeline coating (lining). Holes in the coating will expose the pipe material (steel) to a corrosive environment. It is, therefore, important to identify holes in the coating and take action before the corrosion penetrates the pipe wall. The model proposed in the paper can be used to determine the inspection interval that minimizes the average maintenance cost per time unit. The model formulation is outlined and illustrative examples are solved. The mathematical evaluation of the replacement policy requires numerous assumptions. These assumptions have to be tailored to the specific application. The assumptions and the data provided are included for illustrative purposes to exemplify potential results that may be obtained by using the replacement policy

  1. Estimation of component redundancy in optimal age maintenance

    OpenAIRE

    Siopa, Jorge; Garção, José; Silva, Júlio

    2012-01-01

    The classical Optimal Age-Replacement defines the maintenance strategy based on the equipment failure consequences. For severe consequences an early equipment replacement is recommended. For minor consequences the repair after failure is proposed. One way of reducing the failure consequences is the use of redundancies, especially if the equipment failure rate is decreasing over time, since in this case the preventive replacement does not reduce the risk of failure. The estimation of an ac...

  2. A joint spare part and maintenance inspection optimisation model using the Delay-Time concept

    International Nuclear Information System (INIS)

    Wang Wenbin

    2011-01-01

    Spare parts and maintenance are closely related logistics activities where maintenance generates the need for spare parts. When preventive maintenance is present, it may need more spare parts at one time because of the planned preventive maintenance activities. This paper considers the joint optimisation of three decision variables, e.g., the ordering quantity, ordering interval and inspection interval. The model is constructed using the well-known Delay-Time concept where the failure process is divided into a two-stage process. The objective function is the long run expected cost per unit time in terms of the three decision variables to be optimised. Here we use a block-based inspection policy where all components are inspected at the same time regardless of the ages of the components. This creates a situation that the time to failure since the immediate previous inspection is random and has to be modelled by a distribution. This time is called the forward time and a limiting but closed form of such distribution is obtained. We develop an algorithm for the optimal solution of the decision process using a combination of analytical and enumeration approaches. The model is demonstrated by a numerical example. - Highlights: → Joint optimisation of maintenance and spare part inventory. → The use of the Delay-Time concept. → Block-based inspection. → Fixed order interval but variable order quantity.

  3. Contingent post-closure plan, hazardous waste management units at selected maintenance facilities, US Army National Training Center, Fort Irwin, California

    International Nuclear Information System (INIS)

    1992-01-01

    The National Training Center (NTC) at Fort Irwin, California, is a US Army training installation that provides tactical experience for battalion/task forces and squadrons in a mid- to high-intensity combat scenario. Through joint exercises with US Air Force and other services, the NTC also provides a data source for improvements of training doctrines, organization, and equipment. To meet the training and operational needs of the NTC, several maintenance facilities provide general and direct support for mechanical devices, equipment, and vehicles. Maintenance products used at these facilities include fuels, petroleum-based oils, lubricating grease, various degreasing solvents, antifreeze (ethylene glycol), transmission fluid, brake fluid, and hydraulic oil. Used or spent petroleum-based products generated at the maintenance facilities are temporarily accumulated in underground storage tanks (USTs), collected by the NTC hazardous waste management contractor (HAZCO), and stored at the Petroleum, Oil, and Lubricant (POL) Storage Facility, Building 630, until shipped off site to be recovered, reused, and/or reclaimed. Spent degreasing solvents and other hazardous wastes are containerized and stored on-base for up to 90 days at the NTC's Hazardous Waste Storage Facility, Building 703. The US Environmental Protection Agency (EPA) performed an inspection and reviewed the hazardous waste management operations of the NTC. Inspections indicated that the NTC had violated one or more requirements of Subtitle C of the Resource Conservation and Recovery Act (RCRA) and as a result of these violations was issued a Notice of Noncompliance, Notice of Necessity for Conference, and Proposed Compliance Schedule (NON) dated October 13, 1989. The following post-closure plan is the compliance-based approach for the NTC to respond to the regulatory violations cited in the NON

  4. A periodic inspection and replacement policy for systems subject to competing failure modes due to degradation and traumatic events

    Energy Technology Data Exchange (ETDEWEB)

    Huynh, K.T., E-mail: tuan.huynh@utt.f [Universite de technologie de Troyes, Institut Charles Delaunay and STMR UMR CNRS 6279-12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Barros, A., E-mail: anne.barros@utt.f [Universite de technologie de Troyes, Institut Charles Delaunay and STMR UMR CNRS 6279-12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Berenguer, C., E-mail: christophe.berenguer@utt.f [Universite de technologie de Troyes, Institut Charles Delaunay and STMR UMR CNRS 6279-12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Castro, I.T., E-mail: inmatorres@unex.e [Departamento de Matematicas, Escuela Politecnica, 10071 Caceres (Spain)

    2011-04-15

    This paper deals with the condition-based maintenance of single-unit systems which are subject to the competing and dependent failures due deterioration and traumatic shock events. The main aim is to provide a model to assess the value of condition monitoring information for the maintenance decision-making. A condition-based periodic inspection/replacement policy is developed and compared with a benchmark time-based block replacement policy. Numerical results show that it is indeed useful to follow closely the actual evolution of the system to adapt the maintenance decisions to the true system state to improve the performance of maintenance policies. The analysis of the maintenance costs savings can be used to justify or not the choice to implement a policy based on condition monitoring information and to invest in condition monitoring devices.

  5. A periodic inspection and replacement policy for systems subject to competing failure modes due to degradation and traumatic events

    International Nuclear Information System (INIS)

    Huynh, K.T.; Barros, A.; Berenguer, C.; Castro, I.T.

    2011-01-01

    This paper deals with the condition-based maintenance of single-unit systems which are subject to the competing and dependent failures due deterioration and traumatic shock events. The main aim is to provide a model to assess the value of condition monitoring information for the maintenance decision-making. A condition-based periodic inspection/replacement policy is developed and compared with a benchmark time-based block replacement policy. Numerical results show that it is indeed useful to follow closely the actual evolution of the system to adapt the maintenance decisions to the true system state to improve the performance of maintenance policies. The analysis of the maintenance costs savings can be used to justify or not the choice to implement a policy based on condition monitoring information and to invest in condition monitoring devices.

  6. Analysis of steam-generator tube-rupture events combined with auxiliary-feedwater control-system failure for Three Mile Island-Unit 1 and Zion-Unit 1 pressurized water reactors

    International Nuclear Information System (INIS)

    Nassersharif, B.

    1986-01-01

    A steam-generator tube-rupture (SGTR) event combined with loss of all offsite alternating-current power and failure of the auxiliary-feedwater (AFW) control system has been investigated for the Three Mile Island-Unit 1 (TMI-1) and Zion-Unit 1 (Zion-1) pressurized water reactors. The Transient Reactor Analysis Code was used to simulate the accident sequence for each plant. The objectives of the study were to predict the plant transient response with respect to tube-rupture flow termination, extent of steam generator overfill, and thermal-hydraulic conditions in the steam lines. Two transient cases were calculated: (1) a TMI-1 SGTR and runaway-AFW transient, and (2) a Zion-1 SGTR and runaway-AFW transient. Operator actions terminated the tube-rupture flow by 1342 s (22.4 min) and 1440 s (24.0 min) for TMI-1 and Zion-1, respectively, but AFW injection was continued. The damaged steam generator (DSG) overfilled by 1273 s (21.2 min) for the TMI-1 calculation and by 1604 s (26.7 min) for the Zion-1 calculation. The DSG steam lines were completely filled by 1500 s (25 min) and 2000 s (33.3 min) for TMI-1 and Zion-1, respectively. The maximum subcooling in the steam lines was approx.63 K (approx.113 0 F) for TMI-1 and approx.44 K (approx.80 0 F) for Zion-1

  7. Maintenance evaluation using risk based criteria

    International Nuclear Information System (INIS)

    Torres Valle, A.

    1996-01-01

    The maintenance evaluation is currently performed by using economic and, in some case, technical equipment failure criteria, however this is done to a specific equipment level. In general, when statistics are used the analysis for maintenance optimization are made isolated and whit a post mortem character; The integration provided by mean of Probabilistic Safety assessment (PSA) together with the possibilities of its applications, allow for evaluation of maintenance on the basis of broader scope criteria in regard to those traditionally used. The evaluate maintenance using risk based criteria, is necessary to follow a dynamic and systematic approach, in studying the maintenance strategy, to allow for updating the initial probabilistic models, for including operational changes that often take place during operation of complex facilities. This paper proposes a dynamic evaluation system of maintenance task. The system is illustrated by means of a practical example

  8. International Context Regarding Application of Single Failure Criterion For New Reactors

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.

    2016-01-01

    The Single Failure Criterion (SFC) ensures reliable performance of safety systems in nuclear power plants in response to design basis initiating events. The SFC, basically, requires that the system must be capable of performing its task in the presence of any single failure. The capability of a system to perform its design function in the presence of a single failure could be threatened by a common cause failure such as a fire, flood, or human intervention or by any other cause with potential to induce multiple failures. When applied to plant's response to a postulated design-basis initiating event, the SFC usually represents a requirement that particular safety system performs its safety functions as designed under the conditions which can include: All failures caused by a single failure; All identifiable but non-detectable failures, including those in the non-tested components; All failures and spurious system actions that cause (or are caused by) the postulated event. The paper provides an overview of the regulatory design requirements for new reactors addressing Single Failure Criterion (SFC) in accordance to international best-practices, particularly considering the SCF relation to in-service testing, maintenance, repair, inspection and monitoring of systems, structures and components important to safety. The paper discusses the comparison of the current SFC requirements and guidelines published by the IAEA, WENRA, EUR and nuclear regulators in the United States, United Kingdom, Russia, Korea, Japan, China and Finland. Also, paper addresses the application of SFC requirements in design; considerations for testing, maintenance, repair, inspection and monitoring; allowable equipment outage times; exemptions to SFC requirements; and analysis for SFC application to two-, three- and four-train systems and applications for small and modular reactors. (author).

  9. Characteristics and Outcomes of Pediatric Heart Failure-Related Emergency Department Visits in the United States: A Population-Based Study.

    Science.gov (United States)

    Mejia, Erika J; O'Connor, Matthew J; Lin, Kimberly Y; Song, Lihai; Griffis, Heather; Mascio, Christopher E; Shamszad, Pirouz; Donoghue, Aaron; Ravishankar, Chitra; Shaddy, Robert E; Rossano, Joseph W

    2018-02-01

    To describe the frequency, characteristics, and outcomes of heart failure-related emergency department (ED) visits in pediatric patients. We aimed to test the hypothesis that these visits are associated with higher admission rates, mortality, and resource utilization. A retrospective analysis of the Nationwide Emergency Department Sample for 2010 of patients ≤18 years of age was performed to describe ED visits with and without heart failure. Cases were identified using International Classification of Disease, Ninth Revision, Clinical Modification codes and assessed for factors associated with admission, mortality, and resource utilization. Among 28.6 million pediatric visits to the ED, there were 5971 (0.02%) heart failure-related cases. Heart failure-related ED patients were significantly more likely to be admitted (59.8% vs 4.01%; OR 35.3, 95% CI 31.5-39.7). Among heart failure-related visits, admission was more common in patients with congenital heart disease (OR 5.0, 95% CI 3.3-7.4) and in those with comorbidities including respiratory failure (OR 78.3, 95% CI 10.4-591) and renal failure (OR 7.9, 95% CI 1.7-36.3). Heart failure-related cases admitted to the hospital had a higher likelihood of death than nonheart failure-related cases (5.9% vs 0.32%, P failure (OR 4.5, 95% CI 2.2-9.2) and renal failure (OR 7.8, 95% CI 2.9-20.7). Heart failure-related ED visits were more expensive than nonheart failure-related ED visits ($1460 [IQR $861-2038] vs $778 [IQR $442-1375] [P failure-related visits represent a minority of pediatric ED visits but are associated with increased hospital admission and resource utilization. Copyright © 2017 Elsevier Inc. All rights reserved.

  10. Analysis of dose-incidence relationships for marrow failure in different species, in terms of radiosensitivity of tissue-rescuing units

    International Nuclear Information System (INIS)

    Hendry, J.H.; Roberts, S.A.

    1990-01-01

    The analysis of 68 published sets of dose-incidence data for marrow failure in different species, using a double-log mortality function, indicates: (a) There is more heterogeneity, i.e. greater sums-of-squares per degree of freedom, within the data sets for mouse than for larger species (monkey, dog, sheep, goat, pig). (b) For mice the curves for acute doses are characterized by a D0 of about 100 cGy for tissue-rescuing units (or target cells), which are depleted at most to about 3 x 10(-4) at LD50. (c) Larger species are much less tolerant to target-cell depletion, the corresponding level being consistently in the range of 10(-2)-10(-3) at LD50. Also, the D0 is often lower (approximately 55 cGy), which is compatible in the dog with such a value for hemopoietic progenitor cells. (d) With larger species there is an unexpected reduction in heterogeneity when the dose rate is lower, which gives a D0 lower than expected and a higher extrapolate. It is concluded that the position and slope of the dose-incidence curves are compatible with interpretations based primarily on target-cell number and survival characteristics, modified by additional heterogeneity factors

  11. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    Science.gov (United States)

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  12. A predictive maintenance approach for improved nuclear plant availability

    International Nuclear Information System (INIS)

    Verma, R.M.P.; Pandya, M.B.; Kini, M.P.

    1979-01-01

    Predictive maintenance programme as against preventive maintenance programme aims at diagnosing, inspecting, monitoring, and objective condition-checking of equipment. It helps in forecasting failures, and scheduling the optimal frequencies for overhauls, replacements, lubrication etc. It also helps in establishing work load, manpower, resource planning and inventory control. Various stages of predictive maintenance programme for a nuclear power plant are outlined. A partial list of instruments for predictive maintenance is given. (M.G.B.)

  13. Improving nuclear power plant reliability through predictive maintenance

    International Nuclear Information System (INIS)

    Geilhausen, R.; Kunze, U.

    1996-01-01

    Maintenance strategies can be assigned to one of three categories: failure maintenance, periodic maintenance or condition-oriented maintenance. The optimum maintenance scheme can be selected on the basis of a cost-benefit analysis but the safety of life and limb or the political climate for NPP can hardly expressed in numbers. The implementation of preventive maintenance needs two preconditions: high-performance instrumentation in the form of stationary and mobile monitoring systems for the determination of the condition of the nuclear power plant components and provision of a tool that can handle both the organization of the work and the evaluation of the results obtained. (authors)

  14. Patterns of 6-mercaptopurine and azathioprine maintenance therapy among a cohort of commercially insured individuals diagnosed with Crohn's disease in the United States

    Directory of Open Access Journals (Sweden)

    Lund JL

    2013-12-01

    Full Text Available Jennifer L Lund,1 Suzanne F Cook,2 Jeffery K Allen,2 Charlotte F Carroll,2 Michael D Kappelman3 1Department of Clinical Epidemiology, Aarhus University, Aarhus, Denmark; 2Worldwide Epidemiology, GlaxoSmithKline, Research Triangle Park, NC, USA; 3Department of Pediatrics, University of North Carolina at Chapel Hill, Chapel Hill, NC, USA Background and aims: Thiopurines, including 6-mercaptopurine (6-MP and azathioprine (AZA, are the mainstay of maintenance therapy for Crohn's disease (CD. However, studies examining their effectiveness in routine practice among diverse patient populations are lacking. Among a cohort of new users of 6MP/AZA, we described treatment patterns and changes in subsequent therapy. Methods: Using the Truven Health Analytics databases, we identified all individuals diagnosed with CD and initiating 6-MP/AZA monotherapy from 2001–2008 (n=3,657. We estimated the proportion of CD patients remaining on 6-MP/AZA monotherapy, using Kaplan–Meier methods, and identified predictors of treatment noncontinuation, using multivariable Cox regression. Among the “noncontinuers,” we described subsequent patterns of maintenance therapy and summarized the diagnosis and procedure codes and prescription drug claims preceding treatment discontinuation. Results: The 1-year 6-MP/AZA treatment continuation rate was 42%. Children (age ≤18 years and individuals with no prior anti-tumor necrosis factor (TNF use were more likely to continue 6-MP/AZA, while those dispensed more (>4 outpatient prescriptions for any drug before initiation of 6-MP/AZA were less likely to continue maintenance treatment. Overall, 1,128 (39% and 105 (4% individuals experienced a clinical event potentially indicating active disease or 6-MP/AZA-intolerance prior to discontinuation, respectively. Most patients discontinued therapy; among the remaining patients who failed to continue 6-MP/AZA, most augmented with an anti-TNF. Conclusion: Most patients initiating 6-MP

  15. Data mining and statistical process control for condition-based maintenance; Datamining und statistische Prozesskontrolle zur zustandsorientierten Instandhaltung

    Energy Technology Data Exchange (ETDEWEB)

    Deeskow, Peter; Steinmetz, Urs; Hay, Martin [Evonik Energy Services, Essen (Germany)

    2008-07-01

    Optimum, condition-based maintenance should balance the commercial consequences of an efficiency loss or a component failure and the cost of maintenance. This requires an early and highly reliable detection of abnormalities of the component/unit behaviour. For this purpose key performance indicators (KPIs) can be used which are online calculated from operational measurements and which solely depend on the component condition and do not depend on other influencing factors such as operation mode, load or ambient conditions. Software tools using data mining methods can facilitate the definition and calculation of such KPIs. (orig.)

  16. Associations between nursing home performance and hospital 30-day readmissions for acute myocardial infarction, heart failure and pneumonia at the healthcare community level in the United States.

    Science.gov (United States)

    Pandolfi, Michelle M; Wang, Yun; Spenard, Ann; Johnson, Florence; Bonner, Alice; Ho, Shih-Yieh; Elwell, Timothy; Bakullari, Anila; Galusha, Deron; Leifheit-Limson, Erica; Lichtman, Judith H; Krumholz, Harlan M

    2017-12-01

    To evaluate community-specific nursing home performance with community-specific hospital 30-day readmissions for Medicare patients discharged with acute myocardial infarction, heart failure or pneumonia. Cross-sectional study using 2009-2012 hospital risk-standardised 30-day readmission data for Medicare fee-for-service patients hospitalised for all three conditions and nursing home performance data from the Centers for Medicare & Medicaid Services Five-Star Quality Rating System. Medicare-certified nursing homes and acute care hospitals. 12,542 nursing homes and 3,039 hospitals treating 30 or more Medicare fee-for-service patients for all three conditions across 2,032 hospital service areas in the United States. Community-specific hospital 30-day risk-standardised readmission rates. Community-specific nursing home performance measures: health inspection, staffing, Registered Nurses and quality performance; and an aggregated performance score. Mixed-effects models evaluated associations between nursing home performance and hospital 30-day risk-standardised readmission rates for all three conditions. The relationship between community-specific hospital risk-standardised readmission rates and community-specific overall nursing home performance was statistically significant for all three conditions. Increasing nursing home performance by one star resulted in decreases of 0.29% point (95% CI: 0.12-0.47), 0.78% point (95% CI: 0.60-0.95) and 0.46% point (95% CI: 0.33-0.59) of risk-standardised readmission rates for AMI, HF and pneumonia, respectively. Among the specific measures, higher performance in nursing home overall staffing and Registered Nurse staffing measures was statistically significantly associated with lower hospital readmission rates for all three conditions. Notable geographic variation in the community-specific nursing home performance was observed. Community-specific nursing home performance is associated with community-specific hospital 30-day

  17. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Shimizu, S.; Ando, Y.; Morioka, T.

    1990-01-01

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  18. Building Maintenance Management System for Heritage Museum

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2012-09-01

    Full Text Available An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, category, location, and ownership. This study focuses on Building Maintenance Management System for Heritage Museum, which consists of two case studies in Penang State Museum and Art Gallery, Malaysia and Museum of Perak, Malaysia. The aim of this study is to propose methods to improve the maintenance management system for heritage museum. From the results, the common problem occurs during the implementation for the maintenance of each building is the budget for the maintenance and worker’s skill. The department of each museum must have their own maintenance unit to keep an eye on the maintenance activities for their buildings in order to improve the maintenance management system in their building.

  19. Vibration Spectrum Analysis for Indicating Damage on Turbine and Steam Generator Amurang Unit 1

    Directory of Open Access Journals (Sweden)

    Beny Cahyono

    2017-12-01

    Full Text Available Maintenance on machines is a mandatory asset management activity to maintain asset reliability in order to reduce losses due to failure. 89% of defects have random failure mode, the proper maintenance method is predictive maintenance. Predictive maintenance object in this research is Steam Generator Amurang Unit 1, which is predictive maintenance is done through condition monitoring in the form of vibration analysis. The conducting vibration analysis on Amurang Unit 1 Steam Generator is because vibration analysis is very effective on rotating objects. Vibration analysis is predicting the damage based on the vibration spectrum, where the vibration spectrum is the result of separating time-based vibrations and simplifying them into vibrations based on their frequency domain. The transformation of time-domain-wave into frequency-domain-wave is using the application of FFT, namely AMS Machinery. The measurement of vibration value is done on turbine bearings and steam generator of Unit 1 Amurang using Turbine Supervisory Instrument and CSI 2600 instrument. The result of this research indicates that vibration spectrum from Unit 1 Amurang Power Plant indicating that there is rotating looseness, even though the vibration value does not require the Unit 1 Amurang Power Plant to stop operating (shut down. This rotating looseness, at some point, can produce some indications that similar with the unbalance. In order to avoid more severe vibrations, it is necessary to do inspection on the bearings in the Amurang Unit 1 Power Plant.

  20. Studies on failure kind analysis of the radiologic medical equipment in general hospital

    International Nuclear Information System (INIS)

    Lee, Woo Cheul; Kim, Jeong Lae

    1999-01-01

    This paper included a data analysis of the unit of medical devices using maintenance recording card that had medical devices of unit failure mode, hospital of failure mode and MTBF. The results of the analysis were as follows : 1. Medical devices of unit failure mode was the highest in QC/PM such A hospital as 33.9%, B hospital 30.9%, C hospital 30.3%, second degree was the Electrical and Electronic failure such A hospital as 23.5%, B hospital 25.3%, C hospital 28%, third degree was mechanical failure such A hospital as 19.6%, B hospital 22.5%, C hospital 25.4%. 2. Hospital of failure mode was the highest in Mobile X-ray device(A hospital 62.5%, B hospital 69.5%, C hospital 37.4%), and was the lowest in Sono devices(A hospital 16.76%, B hospital 8.4%, C hospital 7%). 3. Mean time between failures(MTBT) was the highest in SONO devices and was the lowest in Mobile X-ray devices which have 200 - 400 failure hours. 4. Average failure ratio was the highest in Mobile X-ray devices(A hospital 31.3%, B hospital 34.8%, C hospital 18.7%), and was the lowest in Sono(Ultrasound) devices (A hospital 8.4%, B hospital 4.2%, C hospital 3.5%). 5. Failure ratio results of medical devices according to QC/PM part of unit failure mode were as follows ; A hospital was the highest part of QC/PM (50%) in Mamo X-ray device and was the lowest part of QC/PM(26.4%) in Gastro X-ray. B hospital was the highest part of QC/PM(56%) in Mobile X-ray device, and the lowest part of QC/PM(12%) in Gastro X-ray. C hospital was the highest part of QC/PM(60%) in R/F X-ray device, and the lowest a part of QC/PM(21%) in Universal X-ray. It was found that the units responsible for most failure decreased by systematic management. We made the preventive maintenance schedule focusing on adjustment of operating and dust removal

  1. Trends and Perspective in Industrial Maintenance Management

    DEFF Research Database (Denmark)

    Luxhoj, James T.; Thorsteinsson, Uffe; Riis, Jens Ove

    1997-01-01

    With increased global competition for manufacturing, many companies are seeking ways to gain competitative advanges with respect to cost, service, quality and on-time deliveries. The role that effective maintenance management plays in contributing to overall organizational productivity has received...... increased attention. Trends and perspective in industrial maintenance are presented. The result of benchmarking studies from Scandinavia and United States are also presented and compared. Case studies that examine maintenance methods, knowledge, organization and information systems in three Danish...

  2. Two-stage maintenance of a production system with exponentially distributed on and off-periods

    NARCIS (Netherlands)

    van Dijkhuizen, G.C.; van Harten, Aart

    1998-01-01

    We consider an on–off production system which is subject to failure during on-periods. In case of a failure, the production system is maintained correctively. In addition, preventive maintenance is carried out to prevent failures. The costs of both preventive and corrective maintenance are modelled

  3. Maintenance of remote reconnaissance vehicle

    International Nuclear Information System (INIS)

    Schein, D.C.

    1985-01-01

    A description is provided of the maintenance program developed for remote reconnaissance vehicles, such as RRV-1, in use at the Three Mile Island Unit 2. The described approach, which is simple, effective, and flexible, helped to make the effort successful. It will be applied to future projects

  4. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  5. Maintenance Management Update.

    Science.gov (United States)

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  6. On the hazard rate process for imperfectly monitored multi-unit systems

    International Nuclear Information System (INIS)

    Barros, A.; Berenguer, C.; Grall, A.

    2005-01-01

    The aim of this paper is to present a stochastic model to characterize the failure distribution of multi-unit systems when the current units state is imperfectly monitored. The definition of the hazard rate process existing with perfect monitoring is extended to the realistic case where the units failure time are not always detected (non-detection events). The so defined observed hazard rate process gives a better representation of the system behavior than the classical failure rate calculated without any information on the units state and than the hazard rate process based on perfect monitoring information. The quality of this representation is, however, conditioned by the monotony property of the process. This problem is mainly discussed and illustrated on a practical example (two parallel units). The results obtained motivate the use of the observed hazard rate process to characterize the stochastic behavior of the multi-unit systems and to optimize for example preventive maintenance policies

  7. On the hazard rate process for imperfectly monitored multi-unit systems

    Energy Technology Data Exchange (ETDEWEB)

    Barros, A. [Institut des Sciences et Techonologies de l' Information de Troyes (ISTIT-CNRS), Equipe de Modelisation et Surete des Systemes, Universite de Technologie de Troyes (UTT), 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France)]. E-mail: anne.barros@utt.fr; Berenguer, C. [Institut des Sciences et Techonologies de l' Information de Troyes (ISTIT-CNRS), Equipe de Modelisation et Surete des Systemes, Universite de Technologie de Troyes (UTT), 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Grall, A. [Institut des Sciences et Techonologies de l' Information de Troyes (ISTIT-CNRS), Equipe de Modelisation et Surete des Systemes, Universite de Technologie de Troyes (UTT), 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France)

    2005-12-01

    The aim of this paper is to present a stochastic model to characterize the failure distribution of multi-unit systems when the current units state is imperfectly monitored. The definition of the hazard rate process existing with perfect monitoring is extended to the realistic case where the units failure time are not always detected (non-detection events). The so defined observed hazard rate process gives a better representation of the system behavior than the classical failure rate calculated without any information on the units state and than the hazard rate process based on perfect monitoring information. The quality of this representation is, however, conditioned by the monotony property of the process. This problem is mainly discussed and illustrated on a practical example (two parallel units). The results obtained motivate the use of the observed hazard rate process to characterize the stochastic behavior of the multi-unit systems and to optimize for example preventive maintenance policies.

  8. Respiratory Failure

    Science.gov (United States)

    Respiratory failure happens when not enough oxygen passes from your lungs into your blood. Your body's organs, ... brain, need oxygen-rich blood to work well. Respiratory failure also can happen if your lungs can' ...

  9. Process Equipment Failure Mode Analysis in a Chemical Industry

    Directory of Open Access Journals (Sweden)

    J. Nasl Seraji

    2008-04-01

    Full Text Available Background and aims   Prevention of potential accidents and safety promotion in chemical processes requires systematic safety management in them. The main objective of this study was analysis of important process equipment components failure modes and effects in H2S and CO2  isolation from extracted natural gas process.   Methods   This study was done in sweetening unit of an Iranian gas refinery. Failure Mode and Effect Analysis (FMEA used for identification of process equipments failures.   Results   Totally 30 failures identified and evaluated using FMEA. P-1 blower's blade breaking and sour gas pressure control valve bearing tight moving had maximum risk Priority number (RPN, P-1 body corrosion and increasing plug lower side angle of reach DEAlevel control valve  in tower - 1 were minimum calculated RPN.   Conclusion   By providing a reliable documentation system for equipment failures and  incidents recording, maintaining of basic information for later safety assessments would be  possible. Also, the probability of failures and effects could be minimized by conducting preventive maintenance.

  10. Heart Failure

    Science.gov (United States)

    Heart failure is a condition in which the heart can't pump enough blood to meet the body's needs. Heart failure does not mean that your heart has stopped ... and shortness of breath Common causes of heart failure are coronary artery disease, high blood pressure and ...

  11. Imperfect Preventive Maintenance Model Study Based On Reliability Limitation

    Directory of Open Access Journals (Sweden)

    Zhou Qian

    2016-01-01

    Full Text Available Effective maintenance is crucial for equipment performance in industry. Imperfect maintenance conform to actual failure process. Taking the dynamic preventive maintenance cost into account, the preventive maintenance model was constructed by using age reduction factor. The model regards the minimization of repair cost rate as final target. It use allowed smallest reliability as the replacement condition. Equipment life was assumed to follow two parameters Weibull distribution since it was one of the most commonly adopted distributions to fit cumulative failure problems. Eventually the example verifies the rationality and benefits of the model.

  12. Plumbing. Building Maintenance. Module III. Instructor's Guide.

    Science.gov (United States)

    Brunk, Art

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for a plumbing procedures unit of seven lessons. Lesson topics are: safety procedures, joining pipes, water systems, fixtures and appliances, maintenance and repair, drainage systems,…

  13. Lower Choline-Containing Metabolites/Creatine (Cr) Rise and Failure to Sustain NAA/Cr Levels in the Dorsolateral Prefrontal Cortex Are Associated with Depressive Episode Recurrence under Maintenance Therapy: A Proton Magnetic Resonance Spectroscopy Retrospective Cohort Study.

    Science.gov (United States)

    Henigsberg, Neven; Šarac, Helena; Radoš, Marko; Radoš, Milan; Ozretić, David; Foro, Tamara; Erdeljić Turk, Viktorija; Hrabač, Pero; Bajs Janović, Maja; Rak, Benedict; Kalember, Petra

    2017-01-01

    The aim of this study was to evaluate the relationship between changes in proton magnetic resonance spectroscopy (1H-MRS) parameters at the start of the index episode recovery phase and at recurrence in patients with recurrent depression who were treated with prolonged maintenance therapy. 1H-MRS parameters were analyzed in 48 patients with recurrent depression who required maintenance therapy with antidepressant medication prescribed by a psychiatrist and who continued with the same antidepressant during the maintenance phase, either to recurrence of depression, completion of the 10-year observation period, or the start of the withdrawal phase (tapering-off antidepressant). N-acetylaspartate (NAA), choline-containing metabolites (Cho), creatine (Cr), and glutamine/glutamate were measured at the start of the recovery phase and 6 months later. Recurrent depressive episodes occurred in 20 patients. These individuals had a smaller increase in Cho/Cr after the beginning of the recovery phase compared to the non-recurrent patient group and also exhibited a decreased NAA/Cr ratio. Sustainable NAA and increased Cho levels at the onset of the recovery phase of the index episode are early markers of antidepressant effectiveness associated with a lower risk of major depressive disorder recurrence. The NAA and Cho changes in the non-recurrent group may be attributable to increased brain resilience, contrary to the transient temporal effect observed in subjects who experienced a depressive episode.

  14. Planification de la maintenance d'un parc de turbines-alternateurs par programmation mathematique

    Science.gov (United States)

    Aoudjit, Hakim

    A growing number of Hydro-Quebec's hydro generators are at the end of their useful life and maintenance managers fear to face a number of overhauls exceeding what can be handled. Maintenance crews and budgets are limited and these withdrawals may take up to a full year and mobilize significant resources in addition to the loss of electricity production. In addition, increased export sales forecasts and severe production patterns are expected to speed up wear that can lead to halting many units at the same time. Currently, expert judgment is at the heart of withdrawals which rely primarily on periodic inspections and in-situ measurements and the results are sent to the maintenance planning team who coordinate all the withdrawals decisions. The degradations phenomena taking place is random in nature and the prediction capability of wear using only inspections is limited to short-term at best. A long term planning of major overhauls is sought by managers for the sake of justifying and rationalizing budgets and resources. The maintenance managers are able to provide a huge amount of data. Among them, is the hourly production of each unit for several years, the repairs history on each part of a unit as well as major withdrawals since the 1950's. In this research, we tackle the problem of long term maintenance planning for a fleet of 90 hydro generators at Hydro-Quebec over a 50 years planning horizon period. We lay a scientific and rational framework to support withdrawals decisions by using part of the available data and maintenance history while fulfilling a set of technical and economic constraints. We propose a planning approach based on a constrained optimization framework. We begin by decomposing and sorting hydro generator components to highlight the most influential parts. A failure rate model is developed to take into account the technical characteristics and unit utilization. Then, replacement and repair policies are evaluated for each of the components then

  15. Maintenance Optimization of High Voltage Substation Model

    Directory of Open Access Journals (Sweden)

    Radim Bris

    2008-01-01

    Full Text Available The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being optimized, the failure rate and mean time to repair - MTTR.

  16. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  17. Steam saving during maintenance of the 50-MW Unit 7 at Los Azufres geothermal field, Michoacan; Ahorro de vapor durante el mantenimiento de la Unidad 7 de 50 MW en el campo geotermico de Los Azufres, Michoacan

    Energy Technology Data Exchange (ETDEWEB)

    Medina Barajas, Elvia Nohemi; Ruiz Lemus, Alejandro [Comision Federal de Electricidad, Gerencia de Proyectos Geotermoelectricos, Residencia de Los Azufres, Morelia, Michoacan (Mexico)]. E-mail: elvia-medina@cfe.gob.mx

    2011-07-15

    Commercial-steam production in the southern area of Los Azufres, Mich., Mexico, Geothermal Field began in 1982 with the operation of Unit 2, the backpressure 5-MW unit, and continued in 1988 when the 50-MW condensing Unit 7 was commissioned. Today to supply steam to Unit 7, it is necessary to gather steam from 15 production wells, amounting 450 tons per hour (t/h) under operating conditions. During maintenance periods for Unit 7, production wells are removed from the steam-supply system but continue producing steam that is discharged to the atmosphere-a loss affecting the economic life of the geothermal reservoir. Therefore several actions have been proposed and tried to save the steam and preserve the geothermal resource. This paper presents the results of the actions and the technical and economic benefits obtained from them. [Spanish] La produccion de vapor con fines comerciales en la zona sur del campo geotermico de Los Azufres, Mich., Mexico, empezo en 1982 con la puesta en marcha de la Unidad 2 de 5 MW a contrapresion, para continuar en 1988 con la Unidad 7 de 50 MW a condensacion. Para cumplir con el suministro de vapor a la U-7, a la fecha es necesario integrar la produccion de 15 pozos productores, que producen un total de 450 toneladas por hora (t/h) a condiciones de operacion. Durante los periodos de mantenimiento de la U-7 los pozos son desintegrados del sistema de suministro, pero continuan produciendo vapor, el cual es descargado a la atmosfera sin ningun provecho, lo que representa una perdida que afecta la vida util del yacimiento geotermico. Por ello se han propuesto y aplicado diversas acciones operativas en cada uno de esos pozos con el objetivo de ahorrar vapor y preservar el recurso geotermico. En este trabajo se presentan los resultados de esas acciones y los beneficios tecnicos y economicos obtenidos.

  18. design of preventive maintenance scheduling model for ...

    African Journals Online (AJOL)

    connected in parallel, Rj(ti) is the reliability of the jth unit at ith time interval, n is the to- tal number of systems (components or units) connected in parallel. Equations (3) and (4) enable us to deter- mine the reliability of all components, units or sub-systems in an industry. 5. System Reliability with Preventive. Maintenance. Fig.

  19. Maintenance quality assurance peer exchange 2.

    Science.gov (United States)

    2009-04-01

    This report documents a comprehensive study of twenty three maintenance quality assurance : (MQA) programs throughout the United States and Canada. The policies and standards of : each program were synthesized to create a general assessment on the co...

  20. An advanced maintenance advisory and surveillance system for boiler tubes - AMASS

    Energy Technology Data Exchange (ETDEWEB)

    Tomkins, A.B. [ERA Technology Ltd, Leatherhead (United Kingdom)

    1998-12-31

    In a recently completed European collaborative project, the aim was to address the issue of boiler tube failures and thereby plant availability. The reduction of forced outages due to component failures and the reduction of planned outages for preventative maintenance can both contribute in this respect. It has been possible to assess tube degradation due to erosion, corrosion and overheating through the use of on-line techniques (thin layer activation, corrosion probes and novel temperature sensors) and off-line techniques (cold air velocity measurements, laser shearography and measurements of steam side oxide) which have been developed in the project. These techniques have been demonstrated on an oil fired boiler in Portugal and a coal fired unit in Spain. The output from the monitoring techniques has been integrated in the AMASS maintenance advisory and surveillance system. This is a computerised system comprising a spatial database with add-on tools designed to assess data from individual monitors and to provide the user with information on tube life utilisation rates and the probability of tube failure occurring. A description of the monitoring techniques will be described along with some of the results of demonstrating them in the field. Also an overview of the computerized system and the way in which it works will be given along with examples of how it can be used to assist with preventative maintenance and to help avoid unplanned outages. (orig.) 10 refs.

  1. An advanced maintenance advisory and surveillance system for boiler tubes - AMASS

    Energy Technology Data Exchange (ETDEWEB)

    Tomkins, A B [ERA Technology Ltd, Leatherhead (United Kingdom)

    1999-12-31

    In a recently completed European collaborative project, the aim was to address the issue of boiler tube failures and thereby plant availability. The reduction of forced outages due to component failures and the reduction of planned outages for preventative maintenance can both contribute in this respect. It has been possible to assess tube degradation due to erosion, corrosion and overheating through the use of on-line techniques (thin layer activation, corrosion probes and novel temperature sensors) and off-line techniques (cold air velocity measurements, laser shearography and measurements of steam side oxide) which have been developed in the project. These techniques have been demonstrated on an oil fired boiler in Portugal and a coal fired unit in Spain. The output from the monitoring techniques has been integrated in the AMASS maintenance advisory and surveillance system. This is a computerised system comprising a spatial database with add-on tools designed to assess data from individual monitors and to provide the user with information on tube life utilisation rates and the probability of tube failure occurring. A description of the monitoring techniques will be described along with some of the results of demonstrating them in the field. Also an overview of the computerized system and the way in which it works will be given along with examples of how it can be used to assist with preventative maintenance and to help avoid unplanned outages. (orig.) 10 refs.

  2. A Situational Maintenance Model

    DEFF Research Database (Denmark)

    Luxhoj, James T.; Thorsteinsson, Uffe; Riis, Jens Ove

    1997-01-01

    An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance.......An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance....

  3. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices

    OpenAIRE

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older tec...

  4. Transformer oil maintenance

    Energy Technology Data Exchange (ETDEWEB)

    White, J. [A.F. White Ltd., Brantford, ON (Canada)

    2002-08-01

    Proactive treatment is required in the case of transformer oil, since the oil degrades over time, which could result in the potential failure of the transformer or costly repairs. A mineral-based oil is used for transformers because of its chemical properties and dielectric strength. Water and particulate are the main contaminants found in transformer oil, affecting the quality of the oil through reduced insulation. Acid that forms in the oil when reacting with oxygen is called oxidization. It reduces the heat dissipation of the transformer as the acid forms sludge which settles on the windings of the transformer. The first step in the preventive maintenance program associated with transformer oil is the testing of the oil. The base line is established through initial testing, and subsequent annual testing identifies any changes. The minimal requirements are: (1) dielectric breakdown, a measure of the voltage conducted by the oil; (2) neutralization/acid number, which detects the level of acid present in the oil; (3) interfacial tension, which identifies the presence of polar compounds; (4) colour, which displays quality, aging and the presence of contaminants; and (5) water, which decreases the dielectric breakdown voltage. The analysis of the gases present in the oil is another useful tool in a maintenance program for the determination of a possible fault such as arcing, corona or overheated connections and is accomplished through Dissolved Gas Analysis (DGA). Remediation treatment includes upgrading the oil. Ideally, reclamation should be performed in the early stages of the acid buildup before sludging occurs. Onsite reclamation includes Fuller's earth processing and degasification, a process briefly described by the author.

  5. Contraceptive failure

    DEFF Research Database (Denmark)

    Rasch, Vibeke

    2002-01-01

    Most studies focusing on contraceptive failure in relation to pregnancy have focused on contraceptive failure among women having induced abortions, thereby neglecting those women who, despite contraceptive failure, accept the pregnancy and intend to carry the fetus to term. To get a more complete...... picture of the problem of contraceptive failure, this study focuses on contraceptive failure among women with diverse pregnancy outcomes. In all, 3520 pregnant women attending Odense University Hospital were included: 373 had induced abortions, 435 had spontaneous abortions, 97 had ectopic pregnancies......, and 2614 received antenatal care. The variables studied comprise age, partner relationship, number of births, occupational and economical situation, and contraceptive use.Contraceptive failure, defined as contraceptive use (condom, diaphragm, IUD, oral contraception, or another modern method...

  6. Development of maintenance engineering system

    International Nuclear Information System (INIS)

    1995-03-01

    Department of JMTR project has developed the Maintenance Engineering System which evaluates the aging tendency of the facilities. The system is used for the repair plan and the replace period of parts, components, equipments or facilities. The system has the data-base which consists of the check data, the inspection data, the trouble data and the repair data at the JMTR since the virgin criticality. The system is utilized maintenance works and concludes the maintenance procedures for the failure components, equipments and facilities. This system has the following characteristics. (1) Anybody can operate the system as easily as word processor. (2) Data are put into by man-machine-interface. (3) The data sheets are with light color and the recognizable arrangements. (4) The system is cost-efficient using commercial personal computers and applications. The research card and the layouts of the input data sheet had been formatted. Data has been begun to be put into the system and to check its functions. The result demonstrates that the system is available for preventive maintenance at the JMTR. (author)

  7. ITER assembly and maintenance

    International Nuclear Information System (INIS)

    Honda, T.; Davis, F.; Lousteau, D.

    1991-01-01

    This document is intended to describe the work conducted by the ITER Assembly and Maintenance (A and M) Design Unit and the supporting home teams during the ITER Conceptual Design Activities, carried out from 1988 through 1990. Its content consists of two main sections, i.e., Chapter III, which describes the identified tasks to be performed by the A and M system and a general description of the required equipment; and Chapter IV, which provides a more detailed description of the equipment proposed to perform the assigned tasks. A two-stage R and D program is now planned, i.e., (1) a prototype equipment functional tests using full scale mock-ups and (2) a full scale integration demonstration test facility with real components (vacuum vessel with ports, blanket modules, divertor modules, armor tiles, etc.). Crucial in-vessel and ex-vessel operations and the associated remote handling equipment, including handling of divertor plates and blanket modules will be demonstrated in the first phase, whereby the database needed to proceed with the engineering phase will be acquired. The second phase will demonstrate the ability of the overall system to execute the required maintenance procedures and evaluate the performance of the prototype equipment

  8. Heart Failure

    OpenAIRE

    McMurray, John; Ponikowski, Piotr

    2011-01-01

    Heart failure occurs in 3% to 4% of adults aged over 65 years, usually as a consequence of coronary artery disease or hypertension, and causes breathlessness, effort intolerance, fluid retention, and increased mortality. The 5-year mortality in people with systolic heart failure ranges from 25% to 75%, often owing to sudden death following ventricular arrhythmia. Risks of cardiovascular events are increased in people with left ventricular systolic dysfunction (LVSD) or heart failure.

  9. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  10. Maintenance facilities, stores and records

    International Nuclear Information System (INIS)

    Fischer, K.

    1986-01-01

    The topics of this report are: on-site or off-site facilities. On-site facilities: workshops and special facilities. KWU's Service Center, a typical off-site supporting facility in Germany, capabilities and activities. A pool for special tools and equipment: devices for plugging of nozzles, for handling of RPU-studs and RPU internals etc. Devices for and management of radiological protection on-site for typical outage work. Spare parts and spare part management on site, typical examples. KWU's centralized spare part pools for components, generators and turbines etc. A computerized system for spare parts storage and maintenance planning. A system for mutual exchange of operational experience with respect to maintenance and repair activities. Systematic evaluation of failures and statistical results. (orig./GL)

  11. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  12. Study of a simplified method of evaluating the economic maintenance importance of components in nuclear power plant system

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Takagi, Toshiyuki; Kodama, Noriko

    2014-01-01

    Safety risk importance of components in nuclear power plants has been evaluated based on the probabilistic risk assessment and used for the decisions in various plant managements. But economic risk importance of the components has not been discussed very much. Therefore, this paper discusses risk importance of the components from the viewpoint of plant economic efficiency and proposes a simplified evaluation method of the economic risk importance (or economic maintenance importance). As a result of consideration, the followings were obtained. (1) A unit cost of power generation is selected as a performance indicator and can be related to a failure rate of components in nuclear power plant which is a result of maintenance. (2) The economic maintenance importance has to major factors, i.e. repair cost at component failure and production loss associated with plant outage due to component failure. (3) The developed method enables easy understanding of economic impacts of plant shutdown or power reduction due to component failures on the plane which adopts the repair cost in vertical axis and the production loss in horizontal axis. (author)

  13. Quantitative relationships between aging failure data and risk

    International Nuclear Information System (INIS)

    Vesely, W.E.; Vora, J.P.

    1988-01-01

    As part of the United States Nuclear Regulatory Commission's Nuclear Plant Aging Research program, a project is being carried out to quantify the risk effects of aging. The project is called the Risk Evaluation of Aging Phenomena (REAP) Project. With the REAP Project, a procedure has been developed to quantify nuclear power plant risks from aging failure data. The procedure utilizes the linear aging model and its extensions in order to relate component aging failure rates to aging mechanism parameters which are estimable from failure and maintenance data. The aging failure rates can then be used to quantify the age dependent plant risks, such as system unavailabilities, core melt frequency and public health risks. The REAP procedure is different from standard time dependent approaches in that the failure rates are phenomenologically based, allowing engineering information to be utilized. Furthermore, gross data and incomplete data can be utilized. A software package has been developed which systematically analyzes data for aging effects and interfaces with a time dependent risk analysis module to determine the risk implications of the aging effects. (author). 10 refs, 10 figs

  14. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  15. Proactive maintenance for mechanical systems

    CERN Document Server

    Fitch, EC

    1992-01-01

    Written by Dr. E.C. Fitch, the book contains over 340 double column pages which include 400 figures and tables, a comprehensive bibliography, and index. There is no root cause of mechanical failure, known to the author, that has been ignored or left out. Nowhere in the world is this information put together in such a concise and comprehensive manner, and the book will serve as a reference and guide to designers, practising engineers, maintenance technicians, plant managers and operators who must design, maintain and operate fluid-dependent mechanical systems.

  16. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  17. U.S. Department Of Energy's nuclear engineering education research: highlights of recent and current research-III. 4. Early Detection of Plant Equipment Failures: A Case Study in Just-In-Time Maintenance

    International Nuclear Information System (INIS)

    Parlos, Alexander G.; Kim, Kyusung; Bharadwaj, Raj M.

    2001-01-01

    Approximately 60% of all incipient electric motor failures is attributed to mechanical and electromechanical causes, whereas 33% of all motor failures is attributed to faults related to motor winding insulation. There has been much research reported on the detection and diagnosis of incipient motor failures. The most widely accepted approach for detection of mechanical failures is vibration monitoring, whereas motor current monitoring is used for electromechanical faults such as broken rotor bars and end-rings. In this paper, the development and testing of a model-based fault detection system for electric motors is briefly presented. In particular, the presented fault detection system has been developed using only motor nameplate information. Furthermore, the fault detection results presented utilize only motor voltage and current sensor information, minimizing the need for expensive or intrusive sensors. In this study, dynamic recurrent neural networks are used to predict the input-output response of a three-phase induction motor while using an estimate of the motor speed signal. Accurate state filtering of the motor speed using only electrical measurements is feasible, and it has been demonstrated in other recent publications. The developed input-output motor model requires no knowledge of the motor specifics; rather, only motor nameplate information is used. The resulting model appears very effective in accurately predicting the dynamic behavior of the nonlinear motor system to varying supply unbalance and load levels. The motor model is then used to generate the residuals needed in the fault diagnosis system. Following the residual generation step, fault detection must be pursued by appropriately processing the residuals. It is common to first extract features characteristic of the faults being investigated prior to attempting fault detection. In this study, multi-resolution (or wavelet) signal-processing techniques are used in combination with more traditional

  18. Autonomous and professional maintenance in metallurgical enterprise as activities within total productive maintenance

    Directory of Open Access Journals (Sweden)

    B. Gajdzik

    2014-04-01

    Full Text Available The content of this publication consists of notions connected with Total Productive Maintenance (TPM in metallurgical enterprise. The basic areas of devices condition management through Autonomous and Professional Maintenance are described here. Mentioned areas of activities are performed in metallurgical enterprise ArcelorMittal Poland within pillars of World Class Manufacturing (WCM. The aims of UR programs are to maintain the basic functionality of the devices and decrease the number of failures in order to reach improvement of production efficiency.

  19. Probabilistic approach to rationalization of plants maintenance

    International Nuclear Information System (INIS)

    Kasai, Masao; Notoya, Junichi; Uchimoto, Tetsuya; Miya, Kenzo

    2001-01-01

    Since there are a lot of equipments in large plants, their safety and reliability cannot be kept as high level as designed without maintenance activities. Then preventive maintenance is intensively executed in some large plants. However, it will be inefficient to perform the preventive maintenance blindly. To make maintenance activities effective, it is essential to identify the critical equipments influencing plant safety and/or reliability and carry out the maintenance by focusing attentions on these equipments. It needs quantitative analyses to identify the critical equipments based on the data of failure rates. However, complete data set of failure rates cannot necessarily be available for some plants such as nuclear power plants. In this study, we carry out the reliability analysis for generic LNG plant and calculate various quantitative risk importance measures for each equipment. We propose rather qualitative representations for some quantitative measures, considering the situation without complete data set and conclude that it is possible to rationalize maintenance procedure by using these rather qualitative measures, though the level of rationalization is of course limited. (author)

  20. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  1. Demonstration of Sensor Data Integration Across Naval Aviation Maintenance

    Science.gov (United States)

    2018-02-01

    Concepts, Programs and Processes; Maintenance Unit Department, Division Organization; Manpower Management ; and Aviation Officers.” http...Naval Aviation Maintenance Alejandra Jolodosky and Adi Zolotov February 2018 This work was performed under Federal Government Contract...underutilized sensor data. CNA proposed a pilot program that integrated sensor data across maintenance levels to expedite repairs of aviation parts

  2. Optimizing block-based maintenance under random machine usage

    NARCIS (Netherlands)

    de Jonge, Bram; Jakobsons, Edgars

    Existing studies on maintenance optimization generally assume that machines are either used continuously, or that times until failure do not depend on the actual usage. In practice, however, these assumptions are often not realistic. In this paper, we consider block-based maintenance optimization

  3. Predictive maintenance of maritime systems : models and challenges

    NARCIS (Netherlands)

    Tinga, T.; Tiddens, W.W.; Amoiralis, F.; Politis, M.; Cepin, Marko; Bris, Radim

    2017-01-01

    To reduce maintenance and logistic costs and increase the asset availability, a predictive maintenance concept for maritime systems is developed. In the present paper, the physics-of-failure based prognostic methods will be introduced, but also other issues related to the development and application

  4. Optimal maintenance policies in incomplete repair models

    International Nuclear Information System (INIS)

    Kahle, Waltraud

    2007-01-01

    We consider an incomplete repair model, that is, the impact of repair is not minimal as in the homogeneous Poisson process and not 'as good as new' as in renewal processes but lies between these boundary cases. The repairs are assumed to impact the failure intensity following a virtual age process of the general form proposed by Kijima. In previous works field data from an industrial setting were used to fit several models. In most cases the estimated rate of occurrence of failures was that of an underlying exponential distribution of the time between failures. In this paper, it is shown that there exist maintenance schedules under which the failure behavior of the failure-repair process becomes a homogeneous Poisson process

  5. Incorporation of various uncertainties in dependent failure-probability estimation

    International Nuclear Information System (INIS)

    Samanta, P.K.; Mitra, S.P.

    1982-01-01

    This paper describes an approach that allows the incorporation of various types of uncertainties in the estimation of dependent failure (common mode failure) probability. The types of uncertainties considered are attributable to data, modeling and coupling. The method developed is applied to a class of dependent failures, i.e., multiple human failures during testing, maintenance and calibration. Estimation of these failures is critical as they have been shown to be significant contributors to core melt probability in pressurized water reactors

  6. Perioperative acute renal failure.

    LENUS (Irish Health Repository)

    Mahon, Padraig

    2012-02-03

    PURPOSE OF REVIEW: Recent biochemical evidence increasingly implicates inflammatory mechanisms as precipitants of acute renal failure. In this review, we detail some of these pathways together with potential new therapeutic targets. RECENT FINDINGS: Neutrophil gelatinase-associated lipocalin appears to be a sensitive, specific and reliable biomarker of renal injury, which may be predictive of renal outcome in the perioperative setting. For estimation of glomerular filtration rate, cystatin C is superior to creatinine. No drug is definitively effective at preventing postoperative renal failure. Clinical trials of fenoldopam and atrial natriuretic peptide are, at best, equivocal. As with pharmacological preconditioning of the heart, volatile anaesthetic agents appear to offer a protective effect to the subsequently ischaemic kidney. SUMMARY: Although a greatly improved understanding of the pathophysiology of acute renal failure has offered even more therapeutic targets, the maintenance of intravascular euvolaemia and perfusion pressure is most effective at preventing new postoperative acute renal failure. In the future, strategies targeting renal regeneration after injury will use bone marrow-derived stem cells and growth factors such as insulin-like growth factor-1.

  7. Maintenance work management system

    International Nuclear Information System (INIS)

    Kanai, T.; Takahashi, Y.; Takahashi, K.; Nishino, M.; Takeshige, R.

    2000-01-01

    The maintenance work management system supports the efficient drawing up of various documents for the maintenance work at nuclear power stations and the speeding up of the permission procedure. In addition, it improves the quality assurance of the safety and reliability of the maintenance work. Key merits of the system are: 1. Efficiently drawing up various documents for the maintenance work by using the stored data for the previous maintenance work and the pipe and instrument diagram (P and ID) data. 2. Supporting the management work for the completion of maintenance work safety by using the isolation information stored on the computer system. 3. Speeding up the permission procedure by electronic mail and electronic permission. 4. Displaying additional information such as the specifications of equipment, maintenance result, and maintenance plan by linking up with the database of another system. 5. Reducing the cost of hardware devices by using client/server network configurations of personal computers and a personal computer server. (author)

  8. Unsurfaced Road Maintenance Management

    Science.gov (United States)

    1992-12-01

    This draft manual describes an unsurfaced road maintenance management system for use on military installations. This system is available in either a manual or computerized mode (Micro PAVER). The maintenance standards prescribed should protect Govern...

  9. Winter maintenance performance measure.

    Science.gov (United States)

    2016-01-01

    The Winter Performance Index is a method of quantifying winter storm events and the DOTs response to them. : It is a valuable tool for evaluating the States maintenance practices, performing post-storm analysis, training : maintenance personnel...

  10. Circuit card failures and industry mitigation strategy

    Energy Technology Data Exchange (ETDEWEB)

    Mondal, U. [Candu Owners Group, Toronto, Ontario (Canada)

    2012-07-01

    In recent years the nuclear industry has experienced an increase in circuit card failures due to ageing of components, inadequate Preventive Maintenance (PM), lack of effective circuit card health monitoring, etc. Circuit card failures have caused loss of critical equipment, e.g., electro hydraulic governors, Safety Systems, resulting in loss of function and in some cases loss of generation. INPO completed a root cause analysis of 40 Reactor Trips/Scrams in US reactors and has recommended several actions to mitigate Circuit Card failures. Obsolescence of discrete components has posed many challenges in conducting effective preventative maintenance on circuit cards. In many cases, repairs have resulted in installation of components that compromise performance of the circuit cards. Improper termination and worn edge connectors have caused intermittent contacts contributing to circuit card failures. Traditionally, little attention is paid to relay functions and preventative maintenance of relay. Relays contribute significantly to circuit card failures and have dominated loss of generation across the power industry. The INPO study recommended a number of actions to mitigate circuit card failures, such as; identification of critical components and single point vulnerabilities; strategic preventative maintenance; protection of circuit boards against electrostatic discharge; limiting power cycles; performing an effective burn-in prior to commissioning of the circuit cards; monitoring performance of DC power supplies; limiting cabinet temperatures; managing of component aging/degradation mechanism, etc. A subcommittee has been set up under INPO sponsorship to understand the causes of circuit card failure and to develop an effective mitigation strategy. (author)

  11. Analysis and modeling of rail maintenance costs

    Directory of Open Access Journals (Sweden)

    Amir Ali Bakhshi

    2012-01-01

    Full Text Available Railroad maintenance engineering plays an important role on availability of roads and reducing the cost of railroad incidents. Rail is of the most important parts of railroad industry, which needs regular maintenance since it covers a significant part of total maintenance cost. Any attempt on optimizing total cost of maintenance could substantially reduce the cost of railroad system and it can reduce total cost of the industry. The paper presents a new method to estimate the cost of rail failure using different cost components such as cost of inspection and cost of risk associated with possible accidents. The proposed model of this paper is used for a real-world case study of railroad transportation of Tehran region and the results have been analyzed.

  12. South Blackwater Coal`s maintenance program

    Energy Technology Data Exchange (ETDEWEB)

    Nash, J. [South Blackwater Coal Limited, Blackwater, Qld. (Australia)

    1998-09-01

    The South Blackwater operation consists of two opencut mining areas and two underground mines (Laleham and Kenmure) near Blackwater in central Queensland, all of which supply coal to a central coal preparation plant. South Blackwater Coal Ltd. recently developed a maintenance improvement programme, described in this article. The programme involved implementation systems of key performance indicators (KPIs), benchmaking, condition monitoring, work planning and control, failure analysis and maintenance audit. Some improvements became almost immediately apparent, others were quite gradual. Major results included: improved availability (and reliability) of all opencast fleets, improvements in rear dump availability; reduced maintenance man-hours for opencast fleets; and increased availability of the coal handling and preparation plant. The paper is an edited version of that presented at the `Maintenance in mining conference` 16-19 March 1998, held in Bali, Indonesia. 4 figs., 2 photos.

  13. Competence within Maintenance

    OpenAIRE

    Nerland, Annette Smørholm

    2010-01-01

    Maintenance can be a contributing factor to unwanted events, as well as desired events and states. Human competence can be defined as the ability to perform a specific task, action or function successfully, and is therefore a key factor to proper execution of maintenance tasks. Hence,maintenance will have negative consequences if done wrong, and give positive results when done right. The purpose of this report is to study the many aspects of maintenance competence. Endeavoring to improve ...

  14. Laboratory services series: a master-slave manipulator maintenance program

    International Nuclear Information System (INIS)

    Jenness, R.G.; Hicks, R.E.; Wicker, C.D.

    1976-12-01

    The volume of master slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and development of precise procedures for accomplishing the maintenance of 287 installed units. A very satisfactory computer programmed maintenance system has been established at the Laboratory to provide an economical approach to preventive maintenance

  15. Asphalt in Pavement Maintenance.

    Science.gov (United States)

    Asphalt Inst., College Park, MD.

    Maintenance methods that can be used equally well in all regions of the country have been developed for the use of asphalt in pavement maintenance. Specific information covering methods, equipment and terminology that applies to the use of asphalt in the maintenance of all types of pavement structures, including shoulders, is provided. In many…

  16. Optimization of surface maintenance

    International Nuclear Information System (INIS)

    Oeverland, E.

    1990-01-01

    The present conference paper deals with methods of optimizing the surface maintenance of steel-made offshore installations. The paper aims at identifying important approaches to the problems regarding the long-range planning of an economical and cost effective maintenance program. The methods of optimization are based on the obtained experiences from the maintenance of installations on the Norwegian continental shelf. 3 figs

  17. Dukovany NPP maintenance management

    International Nuclear Information System (INIS)

    Siegel, F.

    2005-01-01

    Maintenance planning and management for the technological equipment of the Dukovany NPP are described. A Maintenance Control and Evaluation System has been developed and is in use to help manage the complex maintenance issue. Practical examples of outputs of the System, with a comprehensive use of the cost, reliability and safety related data, are presented. (author)

  18. 49 CFR 214.529 - In-service failure of primary braking system.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false In-service failure of primary braking system. 214... Maintenance Machines and Hi-Rail Vehicles § 214.529 In-service failure of primary braking system. (a) In the event of a total in-service failure of its primary braking system, an on-track roadway maintenance...

  19. Heart Failure

    Science.gov (United States)

    ... Other diseases. Chronic diseases — such as diabetes, HIV, hyperthyroidism, hypothyroidism, or a buildup of iron (hemochromatosis) or ... transplantation or support with a ventricular assist device. Prevention The key to preventing heart failure is to ...

  20. A VITAL service for predictive MOV maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Motor-operated valve (MOV) maintenance can be a major contributor to unplanned plant downtime, either because valve malfunctions cause unscheduled outages, or because unnecessary valve maintenance lengthens scheduled outages. The cause of both situations is a preventive approach to valve maintenance, where maintenance is scheduled according to a timetable instead of according to a demonstrated need. To move towards a predictive maintenance approach, inexpensive methods of collecting and diagnosing real-time data on the conditions of a valve must be made available. Such a system must be capable of detecting and diagnosing degrading mechanical and electrical behaviour at an early stage, as well as being able to predict the time of failure. Without this data, a predictive approach to maintenance is impossible. Westinghouse is addressing the requirements for a predictive approach to MOV maintenance with the introduction of a third-generation of diagnostic systems for motor-operated valves -the portable Valve Intelligent Test and Analysis System (VITALS) and the on-line Valve Monitoring System (VMS). (author)

  1. United States Foreign Policy Failures Toward Revolutionary Iran: Miscalculating Tehran’s Power Projection and Ignoring the National Character of the Iranian People

    Science.gov (United States)

    2010-12-01

    position.36 In 1951, Mosaddeq was elected 34 Roger M. Savory , “Religious Dogma and the...42 Pollack, The Persian Puzzle, 42. 43 Yonah Alexander and Allan Nanes, The United States and Iran: A...Alexander, Yonah, and Allan Nanes. The United States and Iran: A Documentary History. Frederick, Md. : University Publication of America, 1980. Al

  2. Jointly Production and Correlated Maintenance Optimization for Parallel Leased Machines

    Directory of Open Access Journals (Sweden)

    Tarek ASKRI

    2017-04-01

    Full Text Available This paper deals with a preventive maintenance strategy optimization correlated to production for a manufacturing system made by several parallel machines under lease contract. In order to minimize the total cost of production and maintenance by reducing the production system interruptions due to maintenance activities, a correlated group preventive maintenance policy is developed using the gravity center approach (GCA. The aim of this study is to determine an economical production plan and an optimal group preventive maintenance interval Tn at which all machines are maintained simultaneously. An analytical correlation between failure rate of machines and production level is considered and the impact of the preventive maintenance policy on the production plan is studied. Finally, the proposed maintenance policy GPM is compared with an individual simple strategy approach IPM in order to illustrate its efficiency.

  3. EPR design for maintenance

    International Nuclear Information System (INIS)

    Krugmann, U.

    1998-01-01

    Preventive maintenance is very important in achieving high plant availability. For the European Pressurized Reactor (EPR) preventive maintenance has been carefully addressed in the design stage. This is particularly necessary because of the traditionally different maintenance strategies employed in France and Germany. This paper emphasizes the following features introduced in the ERP design to minimize the duration of the refueling outage: (1) containment accessibility during power operation; (2) overall plant layout to facilitate inspections and maintenances within the containment; and (3) safety system design for enabling preventive maintenance during power operation. (author)

  4. Modern electronic maintenance principles

    CERN Document Server

    Garland, DJ

    2013-01-01

    Modern Electronic Maintenance Principles reviews the principles of maintaining modern, complex electronic equipment, with emphasis on preventive and corrective maintenance. Unfamiliar subjects such as the half-split method of fault location, functional diagrams, and fault finding guides are explained. This book consists of 12 chapters and begins by stressing the need for maintenance principles and discussing the problem of complexity as well as the requirements for a maintenance technician. The next chapter deals with the connection between reliability and maintenance and defines the terms fai

  5. Managing nuclear maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    For utilities operating nuclear powerplants, the rules of the game continue to change. Conflicting regulatory pressures and a tougher competitive environment will make management's job more complicated and difficult in the 1990s. Dealing with these pressures successfully requires greater attention to maintenance effectiveness. Utilities can help shape their future environment by developing a well-planned strategy to guide their actions. Parts of the strategy that are discussed include developing a sound maintenance philosophy, selecting a service company, radiation exposure, and managing spare parts. This article also addresses the Swedish experience in maintenance, German philosophy regarding maintenance and the current maintenance practices of the Electricite de France

  6. AIRCRAFT MAINTENANCE HANGAR

    Directory of Open Access Journals (Sweden)

    GEAMBASU Gabriel George

    2017-05-01

    Full Text Available The paper presents the maintenance process that is done on an airplane, at a certain period of time, or after a number of flight hours or cycles and describes the checks performed behind each inspection. The first part of research describes the aircraft maintenance process that has to be done after an updated maintenance manual according with aircraft type, followed by a short introduction about maintenance hangar. The second part of the paper presents a hangar design with a foldable roof and walls, which can be folded or extended, over an airplane when a maintenance process is done, or depending on weather condition.

  7. Pilot Study for Maintenance Rule at KSNP

    International Nuclear Information System (INIS)

    Choi, Kwang Hee; Jeong, Hyeon Jong; Jee, Moon Hak; Hong, Sung Yull

    2005-01-01

    Maintenance Rule (MR), which was developed to monitor the effectiveness of maintenance in a nuclear power plant (NPP), has been received as highly successful program by and large since its implementation in 1996 in the United States. Korea has initiated two pilot programs to implement the Maintenance Rule program in 2003. Selected plants for the pilot implementation are Kori 3 and 4 units and Ulchin 3 and 4 units, where Kori 3 and 4 units are Westinghouse units and Ulchin 3 and 4 units are Korean Standardized Nuclear Power (KSNP) Plant units. This paper describes the results of each key tasks completed to date and insights gained from pilot study on the KSNP units. Currently, Scoping of the functions of maintenance rule and determination of safety significance level have been completed during first year. As first task, total 607 functions were identified and defined by detailed function analysis on 135 systems that cover all plant systems. About 55% of total functions are selected as within the scope of maintenance rule. Among these inscoped functions, 56% of scoped functions are safety related and 44% are non-safety related functions. Evaluation of safety significance for each function was determined by expert panel consist of eight experts in field of plant maintenance, operation, PSA, work schedule and system engineers. As a result, about 46% of functions were determined to be high safety significant functions and rest of the functions were classified as low safety significant. The remaining tasks that are included determination of performance criteria and preparation of implementing guideline will be performed in following years

  8. Analysis of the reasons for failures of the 1500 MW turbines HP diaphragms on the EDF N4 units. Implementation of a solution

    International Nuclear Information System (INIS)

    Franc, J. C.; Franconville, M.

    2002-01-01

    The full text follows. Diaphragms are major components of an impulse type steam turbine since they hold the fixed blades which allow part of the steam expansion (the other part being on the moving blades mounted on the rotor) The 4 impulse type 1500 MW nuclear steam turbines, from the EDF N4 program,were commissioned in 1996 on the CHOOZ and then CIVAUX plants.The diaphragms, located in the HP(high pressure) part of these turbines, have shown signs of failures very soon, due to a cracking of assembly welds,which is dangerous for the machines integrity. These failures questioned a construction mode which had been highly experienced previously. A large campaign of inspections and tests was carried out to feature the ways of failure,on site or in the factory during manufacturing.Site measurements combined with numerical simulations allowed to define excitations, harmful to these components,during operation. Temporary solutions were applied in order to allow immediate restart of the plants.In parallel,a modification of the diaphragms design and assembly method was studied and applied to withstand the various operating stresses. (author)

  9. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  10. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1998-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  11. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  12. General Mechanical Repair. Minor Automotive Maintenance. Volume 1. Teacher's Guide.

    Science.gov (United States)

    East Texas State Univ., Commerce. Occupational Curriculum Lab.

    Fourteen units on minor automotive maintenance are presented in this teacher's guide. The units are the following: introduction to minor automotive maintenance, shop safety, engine principles, fuel system operation and repair, electrical system, ignition system, lubrication system, engine cooling system, exhaust system, wheel bearings and tires,…

  13. Technical evaluation of the susceptibility of safety-related systems to flooding caused by the failure of non-category 1 systems for the San Onofre Nuclear Power Plant, Unit 1

    International Nuclear Information System (INIS)

    Latorre, V.R.; Victor, R.A.

    1980-11-01

    This report documents the technical evaluation of Southern California Edison Company's San Onofre Nuclear Power Plant, Unit 1, to determine whether the failure of any non-Category 1 (seismic) equipment could result in a condition, such as flooding, that might potentially adversely affect the performance of safety-related equipment required for the safe shutdown of the facility or to mitigate the consequences of an accident. Criteria developed by the US Nuclear Regulatory Commission were used to evaluate the acceptability of the existing protection as well as measures taken by Southern California Edison Company to minimize the danger of flooding and to protect safety-related equipment

  14. Research on Application of FMECA in Missile Equipment Maintenance Decision

    Science.gov (United States)

    Kun, Wang

    2018-03-01

    Fault mode effects and criticality analysis (FMECA) is a method widely used in engineering. Studying the application of FMEA technology in military equipment maintenance decision-making, can help us build a better equipment maintenance support system, and increase the using efficiency of weapons and equipment. Through Failure Modes, Effects and Criticality Analysis (FMECA) of equipment, known and potential failure modes and their causes are found out, and the influence on the equipment performance, operation success, personnel security are determined. Furthermore, according to the synthetical effects of the severity of effects and the failure probability, possible measures for prevention and correction are put forward. Through replacing or adjusting the corresponding parts, corresponding maintenance strategy is decided for preventive maintenance of equipment, which helps improve the equipment reliability.

  15. Operation and maintenance manual for septic holding tank system for project W-519, two double-wide construction support trailers

    International Nuclear Information System (INIS)

    MORTIMER, C.S.

    1999-01-01

    This manual was prepared to provide detailed information for the operation and maintenance of the sanitary wastewater holding system. It sets forth system operation and maintenance as well as failure response procedures

  16. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    International Nuclear Information System (INIS)

    Hendrickson, D.W.

    1995-01-01

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences

  17. Improving regulatory oversight of maintenance programs

    International Nuclear Information System (INIS)

    Cook, S.

    2008-01-01

    Safe nuclear power plant operation requires that risks due to failure or unavailability of Structures, Systems and Components (SSCs) be minimized. Implementation of an effective maintenance program is a key means for achieving this goal. In its regulatory framework, the important relationship between maintenance and safety is acknowledged by the CNSC. A high level maintenance program requirement is included in the Class I Facilities Regulations. In addition, the operating licence contains a condition based on the principle that the design function and performance of SSCs needs to remain consistent with the plant's design and analysis documents. Nuclear power plant licensees have the primary responsibility for safe operation of their facilities and consequently for implementation of a successful maintenance program. The oversight role of the Canadian Nuclear Safety Commission (CNSC) is to ensure that the licensee carries out that responsibility. The challenge for the CNSC is how to do this consistently and efficiently. Three opportunities for improvement to regulatory maintenance oversight are being pursued. These are related to the regulatory framework, compliance verification inspection activities and monitoring of self-reporting. The regulatory framework has been improved by clarifying expectations through the issuance of S-210 'Maintenance Programs for Nuclear Power Plants'. Inspection activities have been improved by introducing new maintenance inspections into the baseline program. Monitoring is being improved by making better use of self-reported and industry produced maintenance related performance indicators. As with any type of program change, the challenge is to ensure the consistent and optimal application of regulatory activities and resources. This paper is a summary of the CNSC's approach to improving its maintenance oversight strategy. (author)

  18. Maintenance and replacement policies under technological obsolescence

    International Nuclear Information System (INIS)

    Clavareau, Julien; Labeau, Pierre-Etienne

    2009-01-01

    The technological obsolescence of a unit is characterized by the existence of challenger units displaying identical functionalities, but with higher performances. This paper aims to define and model in a realistic way, possible maintenance policies of a system including replacement strategies when one type of challenger unit is available. The comparison of these possible strategies is performed based on a Monte Carlo estimation of the costs they incur

  19. Maintenance and replacement policies under technological obsolescence

    Energy Technology Data Exchange (ETDEWEB)

    Clavareau, Julien [Service de Metrologie Nucleaire, Universite Libre de Bruxelles, Av. Franklin Roosevelt 50, CP165/84 Bruxelles B-1050 (Belgium)], E-mail: jclavare@ulb.ac.be; Labeau, Pierre-Etienne [Service de Metrologie Nucleaire, Universite Libre de Bruxelles, Av. Franklin Roosevelt 50, CP165/84 Bruxelles B-1050 (Belgium)], E-mail: pelabeau@ulb.ac.be

    2009-02-15

    The technological obsolescence of a unit is characterized by the existence of challenger units displaying identical functionalities, but with higher performances. This paper aims to define and model in a realistic way, possible maintenance policies of a system including replacement strategies when one type of challenger unit is available. The comparison of these possible strategies is performed based on a Monte Carlo estimation of the costs they incur.

  20. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Sculthorpe, Barruy R.

    2002-01-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  1. Determinación de las Prioridades de Mantenimiento en Turbogeneradores “Elektrosila TBФ-100-3600-T3” a partir del Comportamiento de sus Fallos; Determination of Maintenance Priorities in Turbogenerators “Elektrosila TBФ- 100-3600-T3” Based on their Failure

    Directory of Open Access Journals (Sweden)

    Odalys Martínez Rodríguez

    2012-11-01

    Full Text Available Los generadores de potencia son de gran importancia para la producción de electricidad. Un fallo en un generador ocasiona la interrupción de su servicio, limitaciones o pérdida total de la energía generada, tiene efectos negativos sobre la economía y afecta la calidad de la vida de la sociedad. Ello conduce a la necesidad un control estricto de los generadores y sus sistemas, tal que faciliten la detección temprana de desviaciones en sus parámetros de operación e intervenir apropiadamente para impedir la ocurrencia de una avería. Este trabajo tiene como objetivo presentar los resultados de tres variantes empleadas en la determinación de las prioridades de mantenimiento de los turbogeneradores “ELEKTROSILA TBФ-100-3600-T3”, las variantes estudiadas fueron: el comportamiento histórico de los fallos, el comportamiento histórico de la energía indisponible debido a los fallos y el análisis de criticidad; los resultados, sustentados en seis años de estudio, descartaron la utilización del criterio de energía indisponible.  The power generators are very important for the electricity production. A failure in a generator causes the interruption of service, limitations or the complete loss of the generated energy, has negative effects on theeconomy and it harms quality of life of the society. This leads to the necessity of a strict control of the generators as in their systems, such that facilitates the early detection of any deviation on their operationparameters to intervene appropriately and avoid the occurrence of a failure. This paper has the objective to present the results of three variants used in the determination of the priorities of maintenance of theturbogenerators "ELEKTROSILA TBФ-100-3600-T3", the analyzed variants were: the historical behavior of failures, the historical behavior of the unavailable energy due to failures and the analysis of criticality; theobtained results, supported in six years of study, discard

  2. Converter Monitoring Unit for Retrofit of Wind Power Converters

    DEFF Research Database (Denmark)

    Rannestad, Bjorn; Maarbjerg, Anders Eggert; Frederiksen, Kristian

    2018-01-01

    A Converter Monitoring Unit (CMU), which will enable condition monitoring of wind turbine converters is presented in this paper. Reducing the cost of corrective maintenance by means of condition monitoring is a way of lowering Operation & Maintenance (O&M) costs for wind turbine systems....... The CMU must be able to detect a broad range of failure modes related to Insulated Gate Bipolar Transistor (IGBT) power modules and associated gate drives. IGBT collector-emitter on-state voltage (vceon) and current (ic) is sampled in the CMU and used for detection of emerging failures. A new method...... for compensation of unwanted inductive voltage drop in the vceon measurement path is presented, enabling retrofitting of CMUs in existing wind turbines. Finally, experimental results obtained on a prototype CMU are presented. Experimentally the vceon dependency to IGBT junction temperature and deterioration...

  3. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  4. Operating performance of LWR nuclear generating units

    International Nuclear Information System (INIS)

    Pia, S.

    1984-01-01

    This work aims at reviewing, on the basis of historical data, the operational problem areas which explain the degree of availability and productivity achieved up to now by nuclear power plants in commercial operation in the world. The operating performance data of nuclear power plants area analysed with respect to plant type, size and other significant reference parameters and they are evaluated also by comparison with fossil generating unit data. Major performance indices data are presented for both nuclear and fossil units type and distribution of outage causes. Unplanned full outages caused by nuclear power plant equipment and components failure are particulary emphasized. The trend for unplanned full outages due to the failure of components shows decreasing numerical values in 1981 with respect to the previous years. But this result should be weighed with the increasing plant unavailability hours needed for maintenance and repair action (chiefly preventive maintenance on critical components). This means that the number and downtime of forced outage must be drastically reduced for economic reasons (production losses and problems associated with the unavailable unit unplanned replacement) as well as for plant safe and reliable operation (sudden unavailability of key components and frequency of transients associated with plant shutdown and routine startup operation)

  5. Random maintenance policies

    CERN Document Server

    Nakagawa, Toshio

    2014-01-01

    Exploring random maintenance models, this book provides an introduction to the implementation of random maintenance, and it is one of the first books to be written on this subject.  It aims to help readers learn new techniques for applying random policies to actual reliability models, and it provides new theoretical analyses of various models including classical replacement, preventive maintenance and inspection policies. These policies are applied to scheduling problems, backup policies of database systems, maintenance policies of cumulative damage models, and reliability of random redundant systems. Reliability theory is a major concern for engineers and managers, and in light of Japan’s recent earthquake, the reliability of large-scale systems has increased in importance. This also highlights the need for a new notion of maintenance and reliability theory, and how this can practically be applied to systems. Providing an essential guide for engineers and managers specializing in reliability maintenance a...

  6. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document......The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  7. Software evolution and maintenance

    CERN Document Server

    Tripathy, Priyadarshi

    2014-01-01

    Software Evolution and Maintenance: A Practitioner's Approach is an accessible textbook for students and professionals, which collates the advances in software development and provides the most current models and techniques in maintenance.Explains two maintenance standards: IEEE/EIA 1219 and ISO/IEC14764Discusses several commercial reverse and domain engineering toolkitsSlides for instructors are available onlineInformation is based on the IEEE SWEBOK (Software Engineering Body of Knowledge)

  8. Status of fusion maintenance

    International Nuclear Information System (INIS)

    Fuller, G.M.

    1984-01-01

    Effective maintenance will be an essential ingredient in determining fusion system productivity. This level of productivity will result only after close attention is paid to the entire system as an entity and appropriate integration of the elements is made. The status of fusion maintenance is reviewed in the context of the entire system. While there are many challenging developmental tasks ahead in fusion maintenance, the required technologies are available in several high-technology industries, including nuclear fission

  9. Laboratory equipment maintenance contracts.

    Science.gov (United States)

    Boudreau, D A; Scheer, W D; Catrou, P G

    1985-12-01

    The increasing level of technical sophistication and complexity found in clinical laboratory instrumentation today more than ever demands careful attention to maintenance service needs. The time-worn caution for careful definition of requirements for acquisition of a system should also carry over to acquisition of maintenance service. Guidelines are presented for specifications of terms and conditions for maintenance service from the perspective of the laboratorian in the automated clinical laboratory.

  10. Interactive videodisc in maintenance

    International Nuclear Information System (INIS)

    Zwingelstein, G.; Nguyen Van Nghi, B.

    1986-01-01

    After a recall of the videodisc characteristics, this paper presents its utilization by Electricite de France in the framework of training and maintenance. The SICMA (Interactive Communication System in Maintenance) developed and tested by Electricte de France is presented as also its utilization. It has been tested on the sites of Dampierre and Paluel in the cases of training and maintenance (deconnexion of drive rods of control elements); the conclusions of this experimentation are finally given. 4 refs [fr

  11. Failure Modes

    DEFF Research Database (Denmark)

    Jakobsen, K. P.; Burcharth, H. F.; Ibsen, Lars Bo

    1999-01-01

    The present appendix contains the derivation of ten different limit state equations divided on three different failure modes. Five of the limit state equations can be used independently of the characteristics of the subsoil, whereas the remaining five can be used for either drained or undrained s...

  12. Industrial Maintenance Strategies

    International Nuclear Information System (INIS)

    Sajjad Akbar

    2006-01-01

    Industrial plants have become more complex due to technological advancement. This has made the task of maintenance more difficult. The maintenance costs in terms of resources and downtime loss are so high that maintenance function has become a critical factor in a plant's profitability. Industry should devote as much forethought to the management of maintenance function as to production. Maintenance has grown from an art to a precise, technical engineering science. Planning, organizing scheduling and control of maintenance using modern techniques pays dividends in the form of reduced costs and increased reliability. The magnitude and the dimension of maintenance have multiplied due to development in the engineering technologies. Production cost and capacities are directly affected by the breakdown time. Total operating cost including the maintenance cost plays an important role in replacement dimension. The integrated system approach would bring forth the desired results of high maintenance standards. The standards once achieved and sustained, would add to the reliability of the plan and relieve heavy stresses and strains on the engineering logistic support. (author)

  13. Analysis of maintenance strategies

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.

    1998-01-01

    The main topics of the presentation include: (1) an analysis model and methods to evaluate maintenance action programs and the support decision to make changes in them and (2) to understand the maintenance strategies in a systems perspective as a basis for future developments. The subproject showed how systematic models for maintenance analysis and decision support, utilising computerised and statistical tool packages, can be taken into use for evaluation and optimisation of maintenance of active systems from the safety and economic point of view

  14. Remote Maintenance Monitoring System -

    Data.gov (United States)

    Department of Transportation — The Remote Maintenance and Monitoring System (RMMS) is a collection of subsystems that includes telecommunication components, hardware, and software, which serve to...

  15. Army Maintenance System Transformation

    National Research Council Canada - National Science Library

    Gilbertson, Frank V

    2006-01-01

    .... Used in conjunction with pertinent historical data and developed with Army transformation goals in mind, General Systems thinking can provide the framework for guiding maintenance transformation...

  16. A comprehensive approach to RCM-based preventive maintenance program development

    International Nuclear Information System (INIS)

    Hall, B.E.; Davis, T.; Pennington, A.J.

    1988-01-01

    In late 1986, Public Service Electric and Gas Company (PSE ampersand G) concluded that to support its vision and strategic planning it would be necessary to develop a consistent approach to maintenance for all nuclear units at the artificial island. General Physics Corporation was selected to lead a consultant team to support full-scale development of a preventive maintenance (PM) program for Salem and Hope Creek generating stations based on a reliability-centered maintenance (RCM) approach. RCM was selected because it represents a systematic approach to developing a PM program that provides a logical, consistent, and traceable methodology and produces a well-documented engineering basis for the program. Early in 1987, primary objectives for the PM program were defined. The Phase I tasks addressed key programmatic areas such as maintenance philosophy, procedures, condition monitoring, performance trending, equipment failure data base, ogranization, PM program effectiveness evaluation, RCM process, reliability/availability modeling, information management, training, spare parts, software/hardware, and commitments. Phase I of the PM program development project was completed in January 1988. Highlights of the Phase I work and the PM program manual are described

  17. Development of optical fiber cable's inspection technology and maintenance criteria

    International Nuclear Information System (INIS)

    Kim, Min-Su; Ju, Hee-Wan; Shim, Seon-Heum; Lee, Youn-Ki; Kim, Jin-Il; Huh, Tae-Young

    2008-01-01

    Improve the reliability and establish the systematic maintenance methods for the digital control facilities' optical fiber cable, reviewed the technical requirements and the current maintenance procedures, analyzed the optical fiber cable's characteristics through actual test like bending, tension, attenuation. Based on the results of review, test and analysis, prepared the maintenance criteria and standard maintenance guideline. Also we verified those can be applied directly to the operating nuclear power plant through the actual test at Ulchin Unit 6. The details of test and analysis are presented in this paper. Also introduce the contents of maintenance criteria and guidelines

  18. Safety constraints applied to an adaptive Bayesian condition-based maintenance optimization model

    International Nuclear Information System (INIS)

    Flage, Roger; Coit, David W.; Luxhøj, James T.; Aven, Terje

    2012-01-01

    A model is described that determines an optimal inspection and maintenance scheme for a deteriorating unit with a stochastic degradation process with independent and stationary increments and for which the parameters are uncertain. This model and resulting maintenance plans offers some distinct benefits compared to prior research because the uncertainty of the degradation process is accommodated by a Bayesian approach and two new safety constraints have been applied to the problem: (1) with a given subjective probability (degree of belief), the limiting relative frequency of one or more failures during a fixed time interval is bounded; or (2) the subjective probability of one or more failures during a fixed time interval is bounded. In the model, the parameter(s) of a condition-based inspection scheduling function and a preventive replacement threshold are jointly optimized upon each replacement and inspection such as to minimize the expected long run cost per unit of time, but also considering one of the specified safety constraints. A numerical example is included to illustrate the effect of imposing each of the two different safety constraints.

  19. Types of Heart Failure

    Science.gov (United States)

    ... Introduction Types of Heart Failure Classes of Heart Failure Heart Failure in Children Advanced Heart Failure • Causes and ... and procedures related to heart disease and stroke. Heart Failure Questions to Ask Your Doctor Use these questions ...

  20. Classes of Heart Failure

    Science.gov (United States)

    ... Introduction Types of Heart Failure Classes of Heart Failure Heart Failure in Children Advanced Heart Failure • Causes and ... and Advanced HF • Tools and Resources • Personal Stories Heart Failure Questions to Ask Your Doctor Use these questions ...

  1. On maintenance management of wind and nuclear power plants

    International Nuclear Information System (INIS)

    Nilsson, Julia

    2009-11-01

    Electrical production in Sweden today is mainly from nuclear and hydro power. However, there is large increase in renewable energy like wind power and the installed new capacity goals are large. Several electrical production sources are important for the sustainability of the energy system. Maintenance is an approach for keeping a system sustainable. The importance of structured maintenance for reliable electrical production systems triggers the development of qualitative and quantitative maintenance management methods. Examples of these methods are Reliability-Centered Maintenance (RCM) which is a structured qualitative approach that focuses on reliability when planning maintenance, and Reliability Centered Asset Management (RCAM) which is a development of RCM into a quantitative approach with the aim to relate preventive maintenance to total maintenance cost and system reliability. This thesis presents models, as applications of RCAM, based on the methods of Life Cycle Cost (LCC) and mathematical optimization, applied to wind and nuclear power plants. Both deterministic and stochastic approaches have been used and the proposed models are based on the Total Cost model, which summarizes costs for maintenance and production loss, and the Aircraft model, which is an opportunistic maintenance optimization model. Opportunistic maintenance is preventive maintenance performed at opportunities. The wind power applications in this study show on different ways to cover costs of condition monitoring systems (CMS) and further on economic benefits of these when uncertainties of times to failure are included in the model. The nuclear power applications show on that the optimization model is dependent on the discount rate and that a high discount rate gives more motivation for opportunistic replacements. When put into a stochastic framework and compared to other maintenance strategies it is shown that an extended opportunistic maintenance optimization model has a good overall

  2. Optimal interval for major maintenance actions in electricity distribution networks

    Energy Technology Data Exchange (ETDEWEB)

    Louit, Darko; Pascual, Rodrigo [Centro de Mineria, Pontificia Universidad Catolica de Chile, Av. Vicuna MacKenna, 4860 Santiago (Chile); Banjevic, Dragan [Centre for Maintenance Optimization and Reliability Engineering, University of Toronto, 5 King' s College Rd., Toronto, Ontario (Canada)

    2009-09-15

    Many systems require the periodic undertaking of major (preventive) maintenance actions (MMAs) such as overhauls in mechanical equipment, reconditioning of train lines, resurfacing of roads, etc. In the long term, these actions contribute to achieving a lower rate of occurrence of failures, though in many cases they increase the intensity of the failure process shortly after performed, resulting in a non-monotonic trend for failure intensity. Also, in the special case of distributed assets such as communications and energy networks, pipelines, etc., it is likely that the maintenance action takes place sequentially over an extended period of time, implying that different sections of the network underwent the MMAs at different periods. This forces the development of a model based on a relative time scale (i.e. time since last major maintenance event) and the combination of data from different sections of a grid, under a normalization scheme. Additionally, extended maintenance times and sequential execution of the MMAs make it difficult to identify failures occurring before and after the preventive maintenance action. This results in the loss of important information for the characterization of the failure process. A simple model is introduced to determine the optimal MMA interval considering such restrictions. Furthermore, a case study illustrates the optimal tree trimming interval around an electricity distribution network. (author)

  3. Mathematical thinking of maintenance. Problem setting and solving bases

    International Nuclear Information System (INIS)

    2007-01-01

    Plant or mechanical facility for maintenance became more complicated than before and consisted of many subsystems made of various equipments or facilities with parts, which were a system having complicated and hierarchical structure. Maintenance was required to be properly implemented to assure reliability of a system for a long period so as for each equipment to play a specified role for a stable operation of plant. Mathematical thinking using probability theory was rational to optimize maintenance action with failure rate function of system or part of equipment. Reliability function, maintainability function and availability of plant and equipment were defined. Unreliability function was called failure time distribution function (F(t)) and failure rate function (λ(t)) was defined as the ratio of failure time density distribution function (dF(t)/dt) to reliability function (1-F(t)). λ(t) could be expressed as a simple equation with Weibull parameter. Availability at steady state was attributed to ratio of average operating time to sum of operating time and maintenance time, i.e. MTBF/(MTBF+MTTR) where MTBF was mean time between failures and MTTR was mean time to repair. Optimization of system risk and maintenance action was encouraged using computational science simulating material degradation. (T. Tanaka)

  4. National infrastructure maintenance strategy for South Africa

    CSIR Research Space (South Africa)

    Wall, K

    2009-05-01

    Full Text Available Conference, Addis Ababa, Ethiopia, 2009 WATER, SANITATION AND HYGIENE: SUSTAINABLE DEVELOPMENT AND MULTISECTORAL APPROACHES A National Infrastructure Maintenance Strategy for South Africa Kevin Wall, South Africa [OFFICE USE ONLY: REVIEWED...; − effects on human health and economic growth; − lack of effective countermeasures in the event of failure of the service; and − the risk generally to government's growth objectives. Wastewater treatment works are often problematic, as are water...

  5. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    For offshore wind turbines, maintenance costs are substantial due to a large number of component failures. In addition to the repair costs, equipment costs and lost production costs are large due to limited accessibility to the turbines. In order to reduce the costs, preventive methods can be used......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...... maintenance costs, and many studies have also been published for preventive maintenance. However, an important part is the modeling of the relationship between maintenance and reliability, which is typically not modeled in a consistent way. Therefore, the methods cannot be used directly for optimal...

  6. Nuclear instrument maintenance - problems, solutions, and obstacles

    International Nuclear Information System (INIS)

    Vuister, P.H.

    1983-01-01

    In 200 laboratories of South-East Asia, Latin America and Africa a survey was made of the state of instrumentation for nuclear medicine. The principal cause of failures and defects was inadequate quality control and preventive maintenance. On the basis of the survey coordinated research programs were compiled for the maintenance of nuclear instruments. The four principal points of the programs are: to safeguard quality and stable electric power supplies for the instruments, to safeguard permanent temperature and humidity in the environment in which the equipment is operated, effective maintenance, and training of personnel. In the years 1981 and 1982, 14 local training courses were run in which emphasis was put on practicals and tests in mechanics and electronics

  7. Management of planned unit outages

    International Nuclear Information System (INIS)

    Brune, W.

    1984-01-01

    Management of planned unit outages at the Bruno Leuschner Nuclear Power Plant is based on the experience gained with Soviet PWR units of the WWER type over a period of more than 50 reactor-years. For PWR units, planned outages concentrate almost exclusively on annual refuellings and major maintenance of the power plant facilities involved. Planning of such major maintenance work is based on a standardized basic network plan and a catalogue of standardized maintenance and inspection measures. From these, an overall maintenance schedule of the unit and partial process plans of the individual main components are derived (manually or by computer) and, in the temporal integration of major maintenance at every unit, fixed starting times and durations are determined. More than 75% of the maintenance work at the Bruno Leuschner Nuclear Power Plant is carried out by the plant's own maintenance personnel. Large-scale maintenance of every unit is controlled by a special project head. He is assisted by commissioners, each of whom is responsible for his own respective item. A daily control report is made. The organizational centre is a central office which works in shifts around the clock. All maintenance orders and reports of completion pass through this office; thus, the overall maintenance schedule can be corrected daily. To enforce the proposed operational strategy, suitable accompanying technical measures are required with respect to effective facility monitoring and technical diagnosis, purposeful improvement of particularly sensitive components and an increase in the effectiveness of maintenance work by special technologies and devices. (author)

  8. Bridge Failure Due to Inadequate Design of Bed Protection

    Science.gov (United States)

    Gupta, Yogita; Kaur, Suneet; Dindorkar, Nitin

    2017-12-01

    The shallow foundation is generally provided on non-erodible strata or where scour depth is less. It is also preferable for low perennial flow or standing water condition. In the present case study shallow foundation is adopted for box type bridge. The total length of the bridge is 132.98 m, consisting of eight unit of RCC box. Each unit is composed of three cell box. The bottom slab of box unit is acted as raft foundation, founded 500 mm below ground level. River bed protection work is provided on both upstream and downstream side along the whole length of the bridge as it is founded above scour level. The bridge collapsed during the monsoon just after two years of service. The present paper explains the cause of failure. This study on failure of the bridge illustrates the importance of bridge inspection before and after monsoon period and importance of the timely maintenance. Standard specifications of Indian Road Congress for the river bed protection work are also included.

  9. Risk-based maintenance-Techniques and applications

    International Nuclear Information System (INIS)

    Arunraj, N.S.; Maiti, J.

    2007-01-01

    Plant and equipment, however well designed, will not remain safe or reliable if it is not maintained. The general objective of the maintenance process is to make use of the knowledge of failures and accidents to achieve the possible safety with the lowest possible cost. The concept of risk-based maintenance was developed to inspect the high-risk components usually with greater frequency and thoroughness and to maintain in a greater manner, to achieve tolerable risk criteria. Risk-based maintenance methodology provides a tool for maintenance planning and decision making to reduce the probability of failure of equipment and the consequences of failure. In this paper, the risk analysis and risk-based maintenance methodologies were identified and classified into suitable classes. The factors affecting the quality of risk analysis were identified and analyzed. The applications, input data and output data were studied to understand their functioning and efficiency. The review showed that there is no unique way to perform risk analysis and risk-based maintenance. The use of suitable techniques and methodologies, careful investigation during the risk analysis phase, and its detailed and structured results are necessary to make proper risk-based maintenance decisions

  10. Maintenance Trades Guidelines

    Science.gov (United States)

    Weidner, Theodore J.

    2008-01-01

    In 2002, APPA published "Maintenance Staffing Guidelines for Educational Facilities," the first building maintenance trades staffing guideline designed to assist educational facilities professionals with their staffing needs. addresses how facilities professionals can determine the appropriate size and mix of their organization. Contents…

  11. Management of maintenance activities at Cernavoda NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Urjan, R.; Marinescu, S.; Corlan, L.

    2000-01-01

    After the Construction and Commissioning phases are over, the safety and economic performances of each nuclear unit are determined by the quality of its operation as well as by the combination of reliability and availability of the systems consisting the whole unit. Therefore, the value of a good maintenance program in making a safe and profitable operation is now widely recognized; all stations operating with excellent performance have well-defined policies and effectively administered programs to govern maintenance activities. The Cernavoda maintenance optimization initiative is derived from good practices suggested by such recognized bodies as the IAEA, INPO and EPRI. It should be noted that the program is evolving at this time and that this paper is an attempt to summarize the myriad of activities and plans required to finally implement the maintenance program. Although many of the elements of the program are in place, many are in various stages of completion. The main components of the program (policy's objectives, strategies used, specific subprograms, maintenance plans and their integration) are presented in brief along with the performance indicators used to assess the effectiveness of the program and maintenance activities. The new programs intended to be developed are also specified, as well as the main comments and recommendations received from IAEA experts. (author)

  12. Failure Analysis

    International Nuclear Information System (INIS)

    Iorio, A.F.; Crespi, J.C.

    1987-01-01

    After ten years of operation at the Atucha I Nuclear Power Station a gear belonging to a pressurized heavy water reactor refuelling machine, failed. The gear box was used to operate the inlet-outlet heavy-water valve of the machine. Visual examination of the gear device showed an absence of lubricant and that several gear teeth were broken at the root. Motion was transmitted with a speed-reducing device with controlled adjustable times in order to produce a proper fitness of the valve closure. The aim of this paper is to discuss the results of the gear failure analysis in order to recommend the proper solution to prevent further failures. (Author)

  13. Stochastic maintenance optimization at Candu power plants

    International Nuclear Information System (INIS)

    Doyle, E.K.; Duchesne, T.; Lee, C.G.; Cho, D.I.

    2004-01-01

    The use of various innovative maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems as previously reported at ICONE 6 in New Orleans (1996). Further refinement of the station maintenance strategy was evaluated via the applicability of statistical analysis of historical failure data. The viability of stochastic methods in Candu maintenance was illustrated at ICONE 10 in Washington DC (2002). The next phase consists of investigating the validity of using subjective elicitation techniques to obtain component lifetime distributions. This technique provides access to the elusive failure statistics, the lack of which is often referred to in the literature as the principal impediment preventing the use of stochastic methods in large industry. At the same time the technique allows very valuable information to be captured from the fast retiring 'baby boom generation'. Initial indications have been quite positive. The current reality of global competition necessitates the pursuit of all financial optimizers. The next construction phase in the power generation industry will soon begin on a worldwide basis. With the relatively high initial capital cost of new nuclear generation all possible avenues of financial optimization must be evaluated and implemented. (authors)

  14. NIF Maintenance Plan March 2011

    Energy Technology Data Exchange (ETDEWEB)

    Van Wonterghem, Bruno M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-01-30

    Ensuring the reliability of the NIF, including its support systems and utilities, is essential to ensuring the availability of the NIF in its support of laser operations. This document identifies the policies and procedures necessary to perform and support the maintenance of the NIF’s systems. These systems are all encompassing and include the facility, beampath, Line Replaceable Units (LRUs), Safety Interlock System (SIS), and diagnostics and utilities that create the environments within the beampath consisting of vacuum, argon, or clean dry air.

  15. Incorporation of Outcome-Based Contract Requirements in a Real Options Approach for Maintenance Planning

    Science.gov (United States)

    2016-04-30

    corrective maintenance (which increases as the RUL is used up), while maximizing the revenue earned during the RUL (which increases as the RUL is used up...running the system to failure, then performing corrective maintenance The value from exercising the option is the sum of the cumulative revenue loss...and the avoided corrective maintenance cost. The cumulative revenue loss is what the system would earn between the predictive maintenance event and

  16. Maintenance improvement program

    International Nuclear Information System (INIS)

    Derbonne, D.R.; Plunkett, T.F.; Simpson, J.R.

    1989-01-01

    During fuel cycle 1 at River Bend station, considerable effort was expended to reduce corrective maintenance work orders (MWOs) to <1,000. This was done by complementing the plant staff with costly contract personnel. Coming out of the first refueling outage, most contract personnel were released. The change in MWO backlog started a steady rise. It became readily apparent that to avoid costly contract staff time, a maintenance improvement program (MIP) was necessary. The MIP Was primarily directed at two areas: crew efficiency improvements and improved preplanned MWO packages. The overall effect of the MIP was to achieve significant productivity improvements with reduced operation and maintenance cost by providing frequent accountability to all levels of maintenance supervision. The MIP also produced a feeling of pride among the maintenance department employees that had not really existed before. This was the best benefit of all

  17. Joint optimization of production scheduling and machine group preventive maintenance

    International Nuclear Information System (INIS)

    Xiao, Lei; Song, Sanling; Chen, Xiaohui; Coit, David W.

    2016-01-01

    Joint optimization models were developed combining group preventive maintenance of a series system and production scheduling. In this paper, we propose a joint optimization model to minimize the total cost including production cost, preventive maintenance cost, minimal repair cost for unexpected failures and tardiness cost. The total cost depends on both the production process and the machine maintenance plan associated with reliability. For the problems addressed in this research, any machine unavailability leads to system downtime. Therefore, it is important to optimize the preventive maintenance of machines because their performance impacts the collective production processing associated with all machines. Too lengthy preventive maintenance intervals may be associated with low scheduled machine maintenance cost, but may incur expensive costs for unplanned failure due to low machine reliability. Alternatively, too frequent preventive maintenance activities may achieve the desired high reliability machines, but unacceptably high scheduled maintenance cost. Additionally, product scheduling plans affect tardiness and maintenance cost. Two results are obtained when solving the problem; the optimal group preventive maintenance interval for machines, and the assignment of each job, including the corresponding start time and completion time. To solve this non-deterministic polynomial-time problem, random keys genetic algorithms are used, and a numerical example is solved to illustrate the proposed model. - Highlights: • Group preventive maintenance (PM) planning and production scheduling are jointed. • Maintenance interval and assignment of jobs are decided by minimizing total cost. • Relationships among system age, PM, job processing time are quantified. • Random keys genetic algorithms (GA) are used to solve the NP-hard problem. • Random keys GA and Particle Swarm Optimization (PSO) are compared.

  18. Effective maintenance practices to manage system aging

    International Nuclear Information System (INIS)

    Chockie, A.; Bjorkelo, K.

    1992-01-01

    For a variety of economic and technical reasons, there has been a growing concern with the aging of complex systems and components and the role that maintenance can play in reducing this degradation. A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence that their maintenance programs have on their ability to address the systems and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. The four key elements of an effective maintenance program that are important to an aging management program were identified. These are: the selection of critical systems and components; the development of an understanding of aging through the collection and analysis of equipment performance information; the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations. In examining how the four organizations have structured their maintenance programs to include these key elements provides valuable lessons not only for the nuclear power industry, but also for any industrial organization that is concerned with the management of system and component aging degradation. This document provides detail, of these studies

  19. BPX commitment to total remote maintenance

    International Nuclear Information System (INIS)

    Davis, F.C.; Burgess, T.W.

    1991-01-01

    The Burning Plasma Experiment (BPX), to be located at Princeton Plasma Physics Laboratory, is the next major experimental machine in the US Fusion Program. It will be fueled with deuterium-tritium (D-T) that, when burned, will generate high-energy neutrons. This will activate the various materials used in construction of the machine, which will result in high levels of gamma radiation. Any subsequent maintenance activities on the machine or in the test cell area must be performed remotely. The initial criteria for BPX assumed that failure of toroidal field (TF) coil or poloidal field (PF) coil was an unlikely event. Therefore, no provisions were made for remote replacement. Expected failures were limited to the plasma-facing components and the external auxiliary equipment such as heating systems and diagnostics. Recent coil failures experienced at the Tokamak Fusion Test Reactor (TFTR), the Joint European Torus (JET), JT-60, and Tore Supra caused the BPX project staff to reconsider the need for remote replacement. A study was undertaken to investigate how the project would be affected if the capability to recover from a coil failure were required. Potential effects including configuration changes to the machine and facility, project cost, and project operation were considered. The study revealed that it is indeed feasible to design BPX for remote recovery from any coil failure. However, for this to be accomplished effectively, it is imperative to incorporate the necessary remote maintenance features of the components to be remotely replaced into the original design along with all of the other functional features. The remote maintenance capability cannot be retrofitted after the design is complete or the equipment is built. This paper discusses the impacts of the coil remote replacement study and the subsequent changes to the design. 4 figs., 1 tab

  20. Maintenance policy of the nuclear park

    International Nuclear Information System (INIS)

    Teisset, J.M.

    1995-01-01

    The nuclear installations maintenance policy of Electricite de France (EDF) follows three axes: first, controlling the aging of the production tool to warrant the safety and the functional reliability during the 40 years of installations service life. Second: optimizing the maintenance activities taking into account the safety goals, costs, security, dosimetry, duration of outages, and intervention conditions in the decisions. Third: developing a real partnership with contractors. EDF has decided to decentralize its maintenance operations towards each unit which is in charge of the organization of its own project. A better management of the contractor personnel has allowed to increase the performances of maintenance operations. The development of long-term agreements with contractors has permitted to reinforce the qualification, the responsibility and the efficiency of the personnel and to improve their means and tools. (J.S.). 1 photo

  1. Probability distribution of machining center failures

    International Nuclear Information System (INIS)

    Jia Yazhou; Wang Molin; Jia Zhixin

    1995-01-01

    Through field tracing research for 24 Chinese cutter-changeable CNC machine tools (machining centers) over a period of one year, a database of operation and maintenance for machining centers was built, the failure data was fitted to the Weibull distribution and the exponential distribution, the effectiveness was tested, and the failure distribution pattern of machining centers was found. Finally, the reliability characterizations for machining centers are proposed

  2. Optimization of maintenance periodicity of complex of NPP safety systems

    International Nuclear Information System (INIS)

    Kolykhanov, V.; Skalozubov, V.; Kovrigkin, Y.

    2006-01-01

    The analysis of the positive and negative aspects connected to maintenance of the safety systems equipment which basically is in a standby state is executed. Tests of systems provide elimination of the latent failures and raise their reliability. Poor quality of carrying out the tests can be a source of the subsequent failures. Therefore excess frequency of tests can result in reducing reliability of safety systems. The method of optimization of maintenance periodicity of the equipment taking into account factors of its reliability and restoration procedures quality is submitted. The unavailability factor is used as a criterion of optimization of maintenance periodicity. It is offered to use parameters of reliability of the equipment and each of safety systems of NPPs received at developing PSA. And it is offered to carry out the concordance of maintenance periodicity of systems within the NPP maintenance program taking into account a significance factor of the system received on the basis of the contribution of system in CDF. Basing on the submitted method the small computer code is developed. This code allows to calculate reliability factors of a separate safety system and to determine optimum maintenance periodicity of its equipment. Optimization of maintenance periodicity of a complex of safety systems is stipulated also. As an example results of optimization of maintenance periodicity at Zaporizhzhya NPP are presented. (author)

  3. Determination of Pareto frontier in multi-objective maintenance optimization

    International Nuclear Information System (INIS)

    Certa, Antonella; Galante, Giacomo; Lupo, Toni; Passannanti, Gianfranco

    2011-01-01

    The objective of a maintenance policy generally is the global maintenance cost minimization that involves not only the direct costs for both the maintenance actions and the spare parts, but also those ones due to the system stop for preventive maintenance and the downtime for failure. For some operating systems, the failure event can be dangerous so that they are asked to operate assuring a very high reliability level between two consecutive fixed stops. The present paper attempts to individuate the set of elements on which performing maintenance actions so that the system can assure the required reliability level until the next fixed stop for maintenance, minimizing both the global maintenance cost and the total maintenance time. In order to solve the previous constrained multi-objective optimization problem, an effective approach is proposed to obtain the best solutions (that is the Pareto optimal frontier) among which the decision maker will choose the more suitable one. As well known, describing the whole Pareto optimal frontier generally is a troublesome task. The paper proposes an algorithm able to rapidly overcome this problem and its effectiveness is shown by an application to a case study regarding a complex series-parallel system.

  4. Heart Failure in North America

    OpenAIRE

    Blair, John E. A; Huffman, Mark; Shah, Sanjiv J

    2013-01-01

    Heart failure is a major health problem that affects patients and healthcare systems worldwide. Within the continent of North America, differences in economic development, genetic susceptibility, cultural practices, and trends in risk factors and treatment all contribute to both inter-continental and within-continent differences in heart failure. The United States and Canada represent industrialized countries with similar culture, geography, and advanced economies and infrastructure. During t...

  5. Pavement maintenance procedures with and without milling materials

    Directory of Open Access Journals (Sweden)

    Rafiqul A. Tarefder

    2016-01-01

    Full Text Available This study evaluates maintenance treatment followed by different Districts of New Mexico Department of Transportation (NMDOT. In addition, two case studies on the use of old pavement materials, called the “millings”, in maintenance projects are reported. Based on this study, it is observed that none of the Districts have a written procedure for maintenance work. Rather Districts rely on the experience of the maintenance crew for conducting maintenance projects. All Districts prefer to use chip seal for maintenance irrespective of distress conditions of the pavements. Patching and crack sealing are usually done before chip sealing to extend the life of the chip seals. Sand seal, scrub seal, and slurry seal projects are not done by District maintenance crews but by outside contractors. It is also observed that all Districts are interested in using millings in maintenance projects and most have already used millings in at least one maintenance project with some success and failure. Most of the Districts have used coarse fraction of millings in chip seal projects successfully. However, they failed to find a proper way to process the fine fractions of millings. Case Study I shows that fine millings can be used to construct thin overlay when mixed with emulsion in pug mill or hot drums. Case Study II concludes that fine millings can be used as fine/sand seal successfully following the same procedure and using the same equipment as chip seal. Keywords: Millings, Maintenance, Emulsion, Rutting, Pug-mill

  6. Maintenance Process Strategic Analysis

    Science.gov (United States)

    Jasiulewicz-Kaczmarek, M.; Stachowiak, A.

    2016-08-01

    The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.

  7. A condition-based maintenance policy for stochastically deteriorating systems

    International Nuclear Information System (INIS)

    Grall, A.; Berenguer, C.; Dieulle, L.

    2002-01-01

    We focus on the analytical modeling of a condition-based inspection/replacement policy for a stochastically and continuously deteriorating single-unit system. We consider both the replacement threshold and the inspection schedule as decision variables for this maintenance problem and we propose to implement the maintenance policy using a multi-level control-limit rule. In order to assess the performance of the proposed maintenance policy and to minimize the long run expected maintenance cost per unit time, a mathematical model for the maintained system cost is derived, supported by the existence of a stationary law for the maintained system state. Numerical experiments illustrate the performance of the proposed policy and confirm that the maintenance cost rate on an infinite horizon can be minimized by a joint optimization of the maintenance structure thresholds, or equivalently by a joint optimization of a system replacement threshold and the aperiodic inspection schedule

  8. Program integration of predictive maintenance with reliability centered maintenance

    International Nuclear Information System (INIS)

    Strong, D.K. Jr; Wray, D.M.

    1990-01-01

    This paper addresses improving the safety and reliability of power plants in a cost-effective manner by integrating the recently developed reliability centered maintenance techniques with the traditional predictive maintenance techniques of nuclear power plants. The topics of the paper include a description of reliability centered maintenance (RCM), enhancing RCM with predictive maintenance, predictive maintenance programs, condition monitoring techniques, performance test techniques, the mid-Atlantic Reliability Centered Maintenance Users Group, test guides and the benefits of shared guide development

  9. Annual report of the maintenance division for 1965

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-12-01

    The personnel of the Division is organized in groups, each responsible for a number of tasks related to maintenance of reactor mechanical structures, electric equipment, electronic equipment. According to the action plan for 1965 the division for RA reactor maintenance the main activities were: planned maintenance of the reactor components, planned repair of the main components, indispensable repairs during reactor operation, repair during planned shutdown periods and tasks related to improvement of operation components and systems. Quite a significant number of failures was related to electronic equipment resulting from failures of thermometers in the heavy water system due to vibrations of the pumps. A number of spare parts and tools were produced needed for maintenance of reactor components, as well as instruments for control and calibration of reactor measuring devices [sr

  10. Plant maintenance and aging management: Are they the same?

    International Nuclear Information System (INIS)

    Lofaro, R.J.

    1995-01-01

    As part of the NRC's Nuclear Plant Aging Research Program, a number of aging studies were performed on safety-related systems and components which found that, even with current maintenance and monitoring practices in place, a large number of the reported failures are related to aging. This suggests that current practices are not sufficient to completely manage aging degradation, and other factors need to be considered. This paper examines the aging management process and the degree to which maintenance plays a part in it. Component failures and degradation mechanisms identified in aging studies of several different safety systems are summarized and evaluated, then con-elated with the components most frequently failed. This information, along with an analysis of failure causes, is then used to determine the extent to which aging is managed by current maintenance practices. Conclusions and recommendations for proper aging management arc also presented

  11. Nuclear power plants maintenance

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Nuclear power plants maintenance now appears as an important factor contributing to the competitivity of nuclea energy. The articles published in this issue describe the way maintenance has been organized in France and how it led to an actual industrial activity developing and providing products and services. An information note about Georges Besse uranium enrichment plant (Eurodif) recalls that maintenance has become a main data not only for power plants but for all nuclear industry installations. (The second part of this dossier will be published in the next issue: vol. 1 January-February 1989) [fr

  12. Initiating statistical maintenance optimization

    International Nuclear Information System (INIS)

    Doyle, E. Kevin; Tuomi, Vesa; Rowley, Ian

    2007-01-01

    Since the 1980 s maintenance optimization has been centered around various formulations of Reliability Centered Maintenance (RCM). Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy includes evaluation of statistical optimization techniques. A review of successful pilot efforts in this direction is provided as well as initial work with graphical analysis. The present situation reguarding data sourcing, the principle impediment to use of stochastic methods in previous years, is discussed. The use of Crowe/AMSAA (Army Materials Systems Analysis Activity) plots is demonstrated from the point of view of justifying expenditures in optimization efforts. (author)

  13. Heart failure - tests

    Science.gov (United States)

    CHF - tests; Congestive heart failure - tests; Cardiomyopathy - tests; HF - tests ... the best test to: Identify which type of heart failure (systolic, diastolic, valvular) Monitor your heart failure and ...

  14. Building Maintenance. Math Learning Activity Packet.

    Science.gov (United States)

    Grant, Shelia I.

    This collection of learning activities is intended for use in reinforcing mathematics instruction as it relates to building maintenance. Fifty activity sheets are provided. These are organized into units on the following topics: numeration, adding whole numbers, subtracting whole numbers, multiplying whole numbers, dividing whole numbers,…

  15. Plant Maintenance. The Licensee's Viewpoint

    Energy Technology Data Exchange (ETDEWEB)

    Ungi, T. [Heysham 2 Power Station, Nuclear Electric LTD (United Kingdom)

    1997-07-01

    Plant maintenance is a very complex process which requires considerable effort from both within the maintenance process and also many support activities. It is important that the plant maintenance policy is translated into a maintenance programme which will define all relevant aspects of the maintenance. An aspect of this maintenance programme will be a maintenance catalogue which will define the maintenance activities to be carried out and at what frequencies. This paper is aimed at discussing the maintenance philosophy and resulting maintenance catalogues currently adopted in Nuclear Electric Ltd, and in particular at Heysham 2 Power Station. It goes on to consider whether these maintenance catalogues contain the optimum maintenance and if not should they be changed. If change is required, the process by which this change will be brought about is also discussed. (author)

  16. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  17. Experts' meeting: Maintenance '83

    International Nuclear Information System (INIS)

    1983-01-01

    The brochure presents, in full wording, 20 papers read at the experts' meeting ''Maintenance '83'' in Wiesbaden. Most of the papers discuss reliability data (acquisition, evaluation, processing) of nearly all fields of industry. (RW) [de

  18. Economic and organizational determinants of HMO mergers and failures.

    Science.gov (United States)

    Feldman, R; Wholey, D; Christianson, J

    1996-01-01

    This study analyzed data from all operational health maintenance organizations (HMOs) in the United States from 1986 through 1993. Eighty HMOs disappeared through mergers and 149 failed over that period. We estimated a multinomial logit model to predict whether an HMO would merge and survive, merge and disappear, or fail, relative to the probability of no event. We found that enrollment and profitability play a critical role in explaining HMO mergers and failures: large and profitable HMOs were more likely to merge and survive, but less likely to merge and disappear or fail. These results explain why HMO merger and failure rates fell after 1988, as most surviving HMOs became larger and more profitable. Among several market-area variables in the model, state anti-takeover regulations had a negative impact on mergers. Mergers were more likely in markets with more competing HMOs, but the overall market penetration of HMOs had no effect on mergers. This result may have important implications for the current debate over the future of the competitive health care strategy. If public policy successfully stimulates the development of large numbers of new HMOs, another wave of mergers and failures is likely to occur. But it appears that growth in overall HMO penetration will not lead inevitably to increased market concentration.

  19. A basic condition-based maintenance strategy for air-cooled turbine generators

    International Nuclear Information System (INIS)

    Laird, T.; Griffith, G.; Hoof, M.

    2005-01-01

    This paper discusses the methods of using condition-based maintenance (CBM) for turbine generators. Even though it is focused on the maintenance strategy for air-cooled generators, all types of power producers can realize benefits from a better maintenance strategy at lower costs. A reliable assessment of the actual unit condition requires detailed knowledge of the unit design, operational weaknesses, cost of maintenance and operational capabilities. (author)

  20. Predictive maintenance primer

    International Nuclear Information System (INIS)

    Flude, J.W.; Nicholas, J.R.

    1991-04-01

    This Predictive Maintenance Primer provides utility plant personnel with a single-source reference to predictive maintenance analysis methods and technologies used successfully by utilities and other industries. It is intended to be a ready reference to personnel considering starting, expanding or improving a predictive maintenance program. This Primer includes a discussion of various analysis methods and how they overlap and interrelate. Additionally, eighteen predictive maintenance technologies are discussed in sufficient detail for the user to evaluate the potential of each technology for specific applications. This document is designed to allow inclusion of additional technologies in the future. To gather the information necessary to create this initial Primer the Nuclear Maintenance Applications Center (NMAC) collected experience data from eighteen utilities plus other industry and government sources. NMAC also contacted equipment manufacturers for information pertaining to equipment utilization, maintenance, and technical specifications. The Primer includes a discussion of six methods used by analysts to study predictive maintenance data. These are: trend analysis; pattern recognition; correlation; test against limits or ranges; relative comparison data; and statistical process analysis. Following the analysis methods discussions are detailed descriptions for eighteen technologies analysts have found useful for predictive maintenance programs at power plants and other industrial facilities. Each technology subchapter has a description of the operating principles involved in the technology, a listing of plant equipment where the technology can be applied, and a general description of the monitoring equipment. Additionally, these descriptions include a discussion of results obtained from actual equipment users and preferred analysis techniques to be used on data obtained from the technology. 5 refs., 30 figs