  1. 33 CFR 100.1102 - Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam...

    Science.gov (United States)

    2010-07-01

    ... River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). 100.1102 Section... MARINE PARADES SAFETY OF LIFE ON NAVIGABLE WATERS § 100.1102 Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). (a) General. Sponsors are...

  2. Dam-breach analysis and flood-inundation mapping for selected dams in Oklahoma City, Oklahoma, and near Atoka, Oklahoma

    Science.gov (United States)

    Shivers, Molly J.; Smith, S. Jerrod; Grout, Trevor S.; Lewis, Jason M.

    2015-01-01

    Dams provide beneficial functions such as flood control, recreation, and storage of water supplies, but they also entail risk; dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or improper operation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning an emergency response if a dam breach occurs.

  3. Dam! Dam! Dam!

    International Nuclear Information System (INIS)

    McCully, P.

    1997-01-01

    The author of ''Silenced Rivers'' a book questioning the desirability of dam building and hydroelectric power generation argues the main themes of his book in this paper. Despite being hailed by politicians as good solutions to power generation problems, and enthusiastically pursued in China, the U.S.A., the former Soviet Union, India and Japan, dams have far-reaching ecological and human consequences. The ecosystems lost to flooding, and the agricultural land use lost, the human cost in terms of homes and employment lost to reservoirs, disease from water-borne infections such as malaria, and the hazards of dams overflowing or breaking are all factors which are against the case for dam construction. The author argues the hydroelectric power may be renewable, but the social, agricultural and ecological costs are too high to justify it as a method of first choice. (UK)

  4. 33 CFR 207.320 - Mississippi River, Twin City Locks and Dam, St. Paul and Minneapolis, Minn.; pool level.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Mississippi River, Twin City... § 207.320 Mississippi River, Twin City Locks and Dam, St. Paul and Minneapolis, Minn.; pool level. In... the Twin City Locks and Dam, Minneapolis, in the interest of navigation, and supersedes rules and...

  5. Comments by the Quebec Union for Nature Conservation (UQCN) regarding the proposed law on the security of dams

    International Nuclear Information System (INIS)

    Belanger, M.

    1998-09-01

    The Union quebecoise pour la conservation de la nature (UQCN) is an association of 5000 members that is active in the field of nature conservation and environmental protection. Comments made by the UQCN to the Parliamentary Commission on Transport and the Environment on the proposed law on the security of dams are summarized. A number of general and specific comments were made concerning access to information, the process of authorisation, and the definition of high-volume dams. Concern was also expressed about the lack of clear indication of how the plans for the management of dam security and water reservoirs will be coordinated among the various agencies that represent the various users of the river system

  6. Dam Break Analysis of Embankment Dams Considering Breach Characteristics

    Directory of Open Access Journals (Sweden)

    Abolfazl Shamsaei

    2004-05-01

    Full Text Available The study of dam's break, needs the definition of various parameters such as the break cause, its type, its dimension and the duration of breach development. The precise forecast for different aspects of the breach is one of the most important factors for analyzing it in embankment dam. The characteristics of the breach and determination of their vulnerability has the most effect on the waves resulting from dam break. Investigating, about the parameters of the breach in "Silveh" earth dam have been determined using the suitable model. In Silve dam a trapezoid breach with side slope z=0.01m and the average base line b=80m was computed. The duration of the breaches development is 1.9 hour. Regarding the above results and the application of DAM Break software the consequences of the probable break of the dam was determined. The analysis of the results of water covering of the city of Piranshahr located 12km from silve dam confirms that in 3 hours the water will reach the height (level of 1425 meters.

  7. Lessons from the autumn 2014 flash floods in the city of Nîmes and its neighborhood (France: behavior of several mitigation dams and hydrological analysis

    Directory of Open Access Journals (Sweden)

    Fouchier Catherine

    2016-01-01

    Full Text Available The Languedoc area, in Southern France, is prone to autumnal flash floods which are characteristic of the Mediterranean climate. To cope with this threat, the local authorities have chosen to build several dams on the main dangerous rivers of the area. We have focused on the flood mitigation facilities of two operators: the City of Nîmes and the Gardons Rivers Managing authority. After the catastrophic flash flood of October 1988, the city of Nîmes built flood mitigation dams on many of its high-risk streams. These flood barriers worked several times during the intense rainfalls of autumn 2014. The on-site conclusions drawn from these floods and the computation carried out with hydrological models confirmed how well the dams functioned. In 2010, the Gardons Rivers Managing authority built a flood mitigation dam on the Esquielle River to protect the village of Saint-Geniès-de-Malgoirès. The spillway of this dam worked for the first time in the autumn of 2014. We analyzed one of the major floods monitored on that occasion at its outlet. The goals of this study are: (i to evaluate dams efficiency and (ii to test, on a catchment which was not used for its calibration, the AIGA flash flood warning method, which was developed by IRSTEA.

  8. Beyond Texas City: the state of process safety in the unionized U.S. oil refining industry.

    Science.gov (United States)

    McQuiston, Thomas H; Lippin, Tobi Mae; Bradley-Bull, Kristin; Anderson, Joseph; Beach, Josie; Beevers, Gary; Frederick, Randy J; Frederick, James; Greene, Tammy; Hoffman, Thomas; Lefton, James; Nibarger, Kim; Renner, Paul; Ricks, Brian; Seymour, Thomas; Taylor, Ren; Wright, Mike

    2009-01-01

    The March 2005 British Petroleum (BP) Texas City Refinery disaster provided a stimulus to examine the state of process safety in the U.S. refining industry. Participatory action researchers conducted a nation-wide mail-back survey of United Steelworkers local unions and collected data from 51 unionized refineries. The study examined the prevalence of highly hazardous conditions key to the Texas City disaster, refinery actions to address those conditions, emergency preparedness and response, process safety systems, and worker training. Findings indicate that the key highly hazardous conditions were pervasive and often resulted in incidents or near-misses. Respondents reported worker training was insufficient and less than a third characterized their refineries as very prepared to respond safely to a hazardous materials emergency. The authors conclude that the potential for future disasters plagues the refining industry. In response, they call for effective proactive OSHA regulation and outline ten urgent and critical actions to improve refinery process safety.

  9. Allegheny County Dam Locations

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset shows the point locations of dams in Allegheny County. If viewing this description on the Western Pennsylvania Regional Data Center’s open data portal...

  10. Dynamic decision making for dam-break emergency management - Part 2: Application to Tangjiashan landslide dam failure

    Science.gov (United States)

    Peng, M.; Zhang, L. M.

    2013-02-01

    Tangjiashan landslide dam, which was triggered by the Ms = 8.0 Wenchuan earthquake in 2008 in China, threatened 1.2 million people downstream of the dam. All people in Beichuan Town 3.5 km downstream of the dam and 197 thousand people in Mianyang City 85 km downstream of the dam were evacuated 10 days before the breaching of the dam. Making such an important decision under uncertainty was difficult. This paper applied a dynamic decision-making framework for dam-break emergency management (DYDEM) to help rational decision in the emergency management of the Tangjiashan landslide dam. Three stages are identified with different levels of hydrological, geological and social-economic information along the timeline of the landslide dam failure event. The probability of dam failure is taken as a time series. The dam breaching parameters are predicted with a set of empirical models in stage 1 when no soil property information is known, and a physical model in stages 2 and 3 when knowledge of soil properties has been obtained. The flood routing downstream of the dam in these three stages is analyzed to evaluate the population at risk (PAR). The flood consequences, including evacuation costs, flood damage and monetized loss of life, are evaluated as functions of warning time using a human risk analysis model based on Bayesian networks. Finally, dynamic decision analysis is conducted to find the optimal time to evacuate the population at risk with minimum total loss in each of these three stages.

  11. Tuberculosis control in big cities and urban risk groups in the European Union: a consensus statement.

    Science.gov (United States)

    van Hest, N A; Aldridge, R W; de Vries, G; Sandgren, A; Hauer, B; Hayward, A; Arrazola de Oñate, W; Haas, W; Codecasa, L R; Caylà, J A; Story, A; Antoine, D; Gori, A; Quabeck, L; Jonsson, J; Wanlin, M; Orcau, Å; Rodes, A; Dedicoat, M; Antoun, F; van Deutekom, H; Keizer, St; Abubakar, I

    2014-03-06

    In low-incidence countries in the European Union (EU), tuberculosis (TB) is concentrated in big cities, especially among certain urban high-risk groups including immigrants from TB high-incidence countries, homeless people, and those with a history of drug and alcohol misuse. Elimination of TB in European big cities requires control measures focused on multiple layers of the urban population. The particular complexities of major EU metropolises, for example high population density and social structure, create specific opportunities for transmission, but also enable targeted TB control interventions, not efficient in the general population, to be effective or cost effective. Lessons can be learnt from across the EU and this consensus statement on TB control in big cities and urban risk groups was prepared by a working group representing various EU big cities, brought together on the initiative of the European Centre for Disease Prevention and Control. The consensus statement describes general and specific social, educational, operational, organisational, legal and monitoring TB control interventions in EU big cities, as well as providing recommendations for big city TB control, based upon a conceptual TB transmission and control model.

  12. Partnership Creates Centre for Union Studies

    Science.gov (United States)

    Smart, Carol; Roman, Stephen

    1978-01-01

    A unique cooperative venture between the city of Coventry and local trade unions is establishing a library collection of books, periodicals, historical documents, tapes, and films dealing with unions, labor studies, and industrial problems. (JAB)

  13. Competition at the attack of EdF's dams

    International Nuclear Information System (INIS)

    James, O.; Gateaud, P.; Dupin, L.

    2010-01-01

    The exploitation of French hydroelectric dams is at the eve of a big upheaval. EdF, the historical operator, and GdF Suez the French number two of hydropower generation are going to face the strong competition of the big European energy groups. France will open 20% of its hydroelectric potential to competition in order to be in agreement with the opening of energy markets imposed by the European Union, and to increase by 10% the hydroelectric power as requested by the French government policy. The candidates will have to fulfill 3 criteria: investing to increase production, reducing the environmental impacts, and accepting the principle of paying fees. However, some of the French dams suffer from serious pathologies and the health of thousands of small dams remains unknown because of the lack of available data. (J.S.)

  14. Seepage problem in Papan dam and the treatment

    Energy Technology Data Exchange (ETDEWEB)

    Sharghi, A. [JTMA Co., Tehran (Iran, Islamic Republic of); Palassi, M. [Tehran Univ. (Iran, Islamic Republic of). Dept. of Civil Engineering

    2003-07-01

    The Papan dam in the Krygyz Republic is 97 metres high. It is located in the Osh Oblast, within a narrow and steep sided gorge on the Ak-Bura River, approximately 20 kilometres south of the City of Osh. The impoundment of the dam revealed large inflows of water to the downstream dam through the upper half of the dam and through the joints in the right abutment. A number of options were considered before a treatment method was selected. The causes of the leakage were poor grouting, and joints and fissures in the abutment. The remedial process involved the use of a plastic concrete cutoff wall extended from the crest of the dam to a depth of approximately 70 metres, in addition to the use of a grouting curtain in the right abutment. 2 figs.

  15. Dam-breach analysis and flood-inundation mapping for Lakes Ellsworth and Lawtonka near Lawton, Oklahoma

    Science.gov (United States)

    Rendon, Samuel H.; Ashworth, Chad E.; Smith, S. Jerrod

    2012-01-01

    Dams provide beneficial functions such as flood control, recreation, and reliable water supplies, but they also entail risk: dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or misoperation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning the emergency response if a dam breach occurs. Accurate topographic data are vital for developing flood-inundation maps. This report presents results of a cooperative study by the city of Lawton, Oklahoma, and the U.S. Geological Survey (USGS) to model dam-breach scenarios at Lakes Ellsworth and Lawtonka near Lawton and to map the potential flood-inundation areas of such dam breaches. To assist the city of Lawton with completion of the emergency action plans for Lakes Ellsworth and Lawtonka Dams, the USGS collected light detection and ranging (lidar) data that were used to develop a high-resolution digital elevation model and a 1-foot contour elevation map for the flood plains downstream from Lakes Ellsworth and Lawtonka. This digital elevation model and field measurements, streamflow-gaging station data (USGS streamflow-gaging station 07311000, East Cache Creek near Walters, Okla.), and hydraulic values were used as inputs for the dynamic (unsteady-flow) model, Hydrologic Engineering Center's River Analysis System (HEC-RAS). The modeled flood elevations were exported to a geographic information system to produce flood-inundation maps. Water-surface profiles were developed for a 75-percent probable maximum

  16. An Investigation on Water Quality of Darlik Dam Drinking Water using Satellite Images

    Directory of Open Access Journals (Sweden)

    Erhan Alparslan

    2010-01-01

    Full Text Available Darlik Dam supplies 15% of the water demand of Istanbul Metropolitan City of Turkey. Water quality (WQ in the Darlik Dam was investigated from Landsat 5 TM satellite images of the years 2004, 2005, and 2006 in order to determine land use/land cover changes in the watershed of the dam that may deteriorate its WQ. The images were geometrically and atmospherically corrected for WQ analysis. Next, an investigation was made by multiple regression analysis between the unitless planetary reflectance values of the first four bands of the June 2005 Landsat TM image of the dam and WQ parameters, such as chlorophyll-a, total dissolved matter, turbidity, total phosphorous, and total nitrogen, measured at satellite image acquisition time at seven stations in the dam. Finally, WQ in the dam was studied from satellite images of the years 2004, 2005, and 2006 by pattern recognition techniques in order to determine possible water pollution in the dam. This study was compared to a previous study done by the authors in the Küçükçekmece water reservoir, also in Istanbul City.

  17. ESCO FORMATION AS ENABLING FACTOR FOR SMART CITIES DEVELOPMENT IN EUROPEAN UNION (UE: SPAIN CASE ANALYSIS

    Directory of Open Access Journals (Sweden)

    Jesus Morcillo Bellido

    2015-12-01

    Full Text Available Cities have reached a huge magnitude and they represent great potential improvement platforms for wealth, employment and competitiveness creation, but also they involve an enormous amount of complexity that emphasized their future management challenges. Cities evolution could be seen as a strong trend towards the development of more efficient and livable cities that have been called "Smart Cities", where one of key topics is linked to how efficiently scarce resources are managed. This document analyzes the development of Energy Service Companies (ESCO in Spain, as a type of organization preliminary focused on promoting and managing projects related to the efficient use of energy, being their business success linked to energy savings achieved by their clients and getting their revenue from these achieved savings. Outcome of this study expects to provide information of interest to understand the current development of ESCO model projects in Spain as example of what is happening in several major European Union (EU countries in relation to Smart Cities development and subsequence ESCO growth, the important barriers they currently face to grow faster, and to find evidences of how collaboration between organizations could facilitate energy efficiency management, which at the end is linked to a better understanding of the future development of “Smart Cities” initiatives in EU countries.

  18. Wynoochee Lake and dam flood storage reevaluation study

    International Nuclear Information System (INIS)

    Lynch, C.J.

    1993-01-01

    With the desire to increase the revenue generating potential of the Wynoochee Lake and Dam Project the cities of Tacoma and Aberdeen, Washington, have pursued the potential for retrofitting a hydropower plant at the dam. The feasibility of the hydropower plant is dependent on higher average head for power generation. This paper discusses the Corps of Engineers reevaluation of the winter flood control requirements with the aim of raising the elevation of the winter operating pool

  19. Oranization and unionization of the working class in the city of Cordoba (1919-1925

    Directory of Open Access Journals (Sweden)

    Velia Luparello

    2014-01-01

    Full Text Available In this paper, we analyze the organization of the working class and the beginning of their unions in the city of Córdoba between 1919 and 1925. We believe that the organization of workers identities can not be separated from its growing level of social awareness. Nonetheless, we can not ignore the political and dialectical relationship that existed between, on one hand, the groups who were seeking the transformation of their social and economic reality, and on the other hand, the state. That's why we approach the role of the state in relation to labor demands and the responses that the first one gave them.

  20. Harvest facility protects and improves fishery

    International Nuclear Information System (INIS)

    Hampton, T.; Daley, W.

    1991-01-01

    This paper reports that by constructing a trap and transfer/harvest facility to control anadromous fish migration, the trout fishery on the Boardman River was protected and the salmon fishery was improved. The James P. Price Fish Trap and Transfer/Harvest Facility at Traverse City, Michigan, was constructed by the Traverse City Light and Power Department because of a licensing condition during the redevelopment of the Boardman and Sabin hydroelectric plants. The facility was constructed along with a fish ladder at the Union Street Dam to control the anadromous fish migration in lieu of constructing fish ladders at the Union Street, Sabin and Boardman Dams. The Michigan Department of Natural Resources (MDNR) and the U.S. Fish and Wildlife Service required that the fish ladders be constructed before the hydroelectric plants could be reactivated. The MDNR was also planning to introduce salmon into the Boardman River as far up as the reservoir of the Boardman Dam, which is the third dam from the mouth of the river

  1. National Dam Safety Program. Junior Lake Dam, (MO 11526) Missouri - Kansas City Basin, Callaway County, Missouri. Phase I Inspection Report.

    Science.gov (United States)

    1980-10-01

    Lake, Dam Inspection, Private Dams 20 AWTACT (Ce ffm ew - m*1et N naeey ad identfy by block number) This report was prepared under the National Program...cO r " 7 - IM-.r Il: r’ o .rrr4 QM zc PLT DL1 ~OC.4..NW to~.. c pz acca ~ ~ ~ 0 AaO cr~c 0000000000 ca~cc 0 NOCC~C ~ j...a ~ in =o ,0 0 00 O 0~ co

  2. SUITABLE LOCATION OF SHEET PILE UNDER DAM RESTING ON SANDY SOIL WITH CAVITY

    Directory of Open Access Journals (Sweden)

    Laith J. Aziz

    2018-05-01

    Full Text Available This research describes the seepage characteristics of experimental model test of dam with cutoff located at different region (at dam heel, at mid floor of dam, and at dam toe. It is resting on sandy soil with cavity at different locations in X and Y directions (such as in Al-Najaf soil city. Thirty three model tests are performed in laboratory by using steel box to estimate the quantity of the seepage and flow lines direction. It was concluded that the best location of the cutoff wall is at the dam toe for model test with cavity ( Xc B = 0 and 0.5, but for model test with cavity ( Xc B ≥1, the best location of the sheet pile wall becomes at the dam heel. For negative location of the cavity, the best location of the sheet pile wall is at the middle of the floor dam.

  3. Dam safety at Seven Sisters Generating Station

    International Nuclear Information System (INIS)

    Carson, R. W.; Gupta, R. C.

    1996-01-01

    A safety surveillance program for all hydraulic structures in Manitoba was first implemented in 1979, and updated in 1988. This contribution describes the current status of the program, and the nature of the issues that the program was designed to address. The Seven Sisters Station's dam on the Winnipeg River, about 90 km northeast of the City of Winnipeg, was used as an example. Extensive reviews of flood risks and downstream inundation potential at Seven Sisters' revealed a number of deficiencies; these findings will be incorporated into a corporate plan of overall remediation. Updating the program will also include efforts to ensure adherence to national dam safety guidelines. 5 figs

  4. Tailings dams from the perspective of conventional dam engineering

    International Nuclear Information System (INIS)

    Szymanski, M.B.

    1999-01-01

    A guideline intended for conventional dams such as hydroelectric, water supply, flood control, or irrigation is used sometimes for evaluating the safety of a tailings dam. Differences between tailings dams and conventional dams are often substantial and, as such, should not be overlooked when applying the techniques or safety requirements of conventional dam engineering to tailings dams. Having a dam safety evaluation program developed specifically for tailings dams is essential, if only to reduce the chance of potential errors or omissions that might occur when relying on conventional dam engineering practice. This is not to deny the merits of using the Canadian Dam Safety Association Guidelines (CDSA) and similar conventional dam guidelines for evaluating the safety of tailings dams. Rather it is intended as a warning, and as a rationale underlying basic requirement of tailings dam emgineering: specific experience in tailings dams is essential when applying conventional dam engineering practice. A discussion is included that focuses on the more remarkable tailings dam safety practics. It is not addressed to a technical publications intended for such dams, or significantly different so that the use of conventional dam engineering practice would not be appropriate. The CDSA Guidelines were recently revised to include tailings dams. But incorporating tailings dams into the 1999 revision of the CDSA Guidelines is a first step only - further revision is necessary with respect to tailings dams. 11 refs., 2 tabs

  5. Chinese engineers and scientists urge leadership to change Three Gorges Dam operating plan

    International Nuclear Information System (INIS)

    2000-01-01

    An appeal to the Chinese Leadership by a group of senior engineers, water management experts and academics about the dire consequences of filling the Three Gorges reservoir on the Yangtze River to 175 metres, is reported. Originally, the plan was to keep water levels behind the Three Gorges Dam at 156 metres for the first ten years of operation, in order to allow for resettlement of people displaced by building the dam, and to evaluate the impact of silt deposits on navigation and ports at the upper end of the reservoir. Plans have changed in 1997; the water level is now scheduled to rise to 175 metres in the sixth year of the dam's operation in order to maximize the dam's power output. The appeal by 53 experts warned the Chinese Government that the filling of the reservoir to 175 metres would displace 1.13 million people and raise the water level in the Yangtze River more than 10 metres at Chongqing City, submerging drainage outlets and backing up the city's sewage, as well as increase silt deposits, blocking shipping traffic along the Yangtze River. A parallel is drawn with the Sanmenxia Dam on the Yellow River. It was completed in 1960; it has proven to be useless for controlling floods while producing only one-third of its expected output due to massive silt build-up in the reservoir

  6. Chinese engineers and scientists urge leadership to change Three Gorges Dam operating plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-04-26

    An appeal to the Chinese Leadership by a group of senior engineers, water management experts and academics about the dire consequences of filling the Three Gorges reservoir on the Yangtze River to 175 metres, is reported. Originally, the plan was to keep water levels behind the Three Gorges Dam at 156 metres for the first ten years of operation, in order to allow for resettlement of people displaced by building the dam, and to evaluate the impact of silt deposits on navigation and ports at the upper end of the reservoir. Plans have changed in 1997; the water level is now scheduled to rise to 175 metres in the sixth year of the dam's operation in order to maximize the dam's power output. The appeal by 53 experts warned the Chinese Government that the filling of the reservoir to 175 metres would displace 1.13 million people and raise the water level in the Yangtze River more than 10 metres at Chongqing City, submerging drainage outlets and backing up the city's sewage, as well as increase silt deposits, blocking shipping traffic along the Yangtze River. A parallel is drawn with the Sanmenxia Dam on the Yellow River. It was completed in 1960; it has proven to be useless for controlling floods while producing only one-third of its expected output due to massive silt build-up in the reservoir.

  7. Final report of coordination and cooperation with the European Union on embankment failure analysis

    Science.gov (United States)

    There has been an emphasis in the European Union (EU) community on the investigation of extreme flood processes and the uncertainties related to these processes. Over a 3-year period, the EU and the U.S. dam safety community (1) coordinated their efforts and collected information needed to integrate...

  8. Dam Safety Concepts

    NARCIS (Netherlands)

    Duricic, J.

    2014-01-01

    The majority of dams constructed in the world are dams that can be categorized as embankment dams. Throughout history we can point to many failures of dams, and embankment dams in particular. Nowadays it is clear that the goal to construct stable dams has not been achieved, even with advanced

  9. Special design issues related to the G. Ross Lord Dam constructed in Metropolitan Toronto

    Energy Technology Data Exchange (ETDEWEB)

    Sowa, V.A. [Jacques Whitford and Associates Ltd., Vancouver, BC (Canada); Tawil, A.H. [Acres International Ltd., Niagara Falls, ON (Canada); Haley, D.R. [Toronto Region and Conservation Authority, Downsview, ON (Canada)

    2002-07-01

    This paper describes the special considerations required to build a flood control dam in a metropolitan area that holds major city infrastructures such as power transmission towers, pipelines, sanitary sewers and graveyards. The paper refers to the G. Ross Lord Dam, a 20 m high earth fill flood control dam which was constructed in 1973 on the West Branch of the Don River in Toronto. It was built following recommendations after Hurricane Hazel caused widespread flooding and the death of 81 people in 1954. The dam includes a concrete chute spillway and stilling basin. The geotechnical design of the dam was described along with the dam structures and the methods used to flood proof the infrastructure. The dam has a sloping impervious core and an upstream blanket to reduce seepage. Seepage control is provided by a drainage blanket and a chimney drain. A main overflow spillway was constructed on the south abutment, and a low level outlet was constructed at the base of the dam to accommodate normal river flows through the dam. Most of the water level control during a flood event is provided by the main overflow spillway. Spillway slab anchor keys prevent down slope creep of the slabs. The dam, the spillway and the reservoir structure have performed well since construction. 6 refs., 10 figs.

  10. NRC inventory of dams

    International Nuclear Information System (INIS)

    Lear, G.E.; Thompson, O.O.

    1983-01-01

    The NRC Inventory of Dams has been prepared as required by the charter of the NRC Dam Safety Officer. The inventory lists 51 dams associated with nuclear power plant sites and 14 uranium mill tailings dams (licensed by NRC) in the US as of February 1, 1982. Of the 85 listed nuclear power plants (148 units), 26 plants obtain cooling water from impoundments formed by dams. The 51 dams associated with the plants are: located on a plant site (29 dams at 15 plant sites); located off site but provide plant cooling water (18 dams at 11 additional plant sites); and located upstream from a plant (4 dams) - they have been identified as dams whose failure, and ensuing plant flooding, could result in a radiological risk to the public health and safety. The dams that might be considered NRC's responsibility in terms of the federal dam safety program are identified. This group of dams (20 on nuclear power plant sites and 14 uranium mill tailings dams) was obtained by eliminating dams that do not pose a flooding hazard (e.g., submerged dams) and dams that are regulated by another federal agency. The report includes the principal design features of all dams and related useful information

  11. Large Dam Effects on Flow Regime and Hydraulic Parameters of river (Case study: Karkheh River, Downstream of Reservoir Dam

    Directory of Open Access Journals (Sweden)

    Farhang Azarang

    2017-06-01

    Full Text Available Introduction: The critical role of the rivers in supplying water for various needs of life has led to engineering identification of the hydraulic regime and flow condition of the rivers. Hydraulic structures such dams have inevitable effects on their downstream that should be well investigated. The reservoir dams are the most important hydraulic structures which are the cause of great changes in river flow conditions. Materials and Methods: In this research, an accurate assessment was performed to study the flow regime of Karkheh river at downstream of Karkheh Reservoir Dam as the largest dam in Middle East. Karkheh River is the third waterful river of Iran after Karun and Dez and the third longest river after the Karun and Sefidrud. The Karkheh Dam is a large reservoir dam built in Iran on the Karkheh River in 2000. The Karkheh Reservoir Dam is on the Karkheh River in the Northwestern Khouzestan Province, the closest city being Andimeshk to the east. The part of Karkheh River, which was studied in this research is located at downstream of Karkheh Reservoir Dam. This interval is approximately 94 km, which is located between PayePol and Abdolkhan hydrometric stations. In this research, 138 cross sections were used along Karkheh River. Distance of cross sections from each other was 680m in average. The efficient model of HEC-RAS has been utilized to simulate the Karkheh flow conditions before and after the reservoir dam construction using of hydrometric stations data included annually and monthly mean discharges, instantaneous maximum discharges, water surface profiles and etc. Three defined discharges had been chosen to simulate the Karkheh River flow; maximum defined discharge, mean defined discharge and minimum defined discharge. For each of these discharges values, HEC-RAS model was implemented as a steady flow of the Karkheh River at river reach of study. Water surface profiles of flow, hydraulic parameters and other results of flow regime in

  12. Dams

    Data.gov (United States)

    Vermont Center for Geographic Information — This dataset �is generated from from the Vermont Dam Inventory (VDI). The VDI is managed by the VT DEC's Dam Safety and Hydrology Section and contains information...

  13. A virtual capital for the European Union?

    NARCIS (Netherlands)

    Mamadouh, V.

    2000-01-01

    This article explores the websites of the key institutions of the European Union to consider whether these applications of the new information and communication technologies may become a functional equivalent of the national capital city in the emerging supranational political arena. Three functions

  14. COMPREHENSIVE ANALYSIS ON SEEPAGE AND STRUCTURAL STABILITY OF EARTH-ROCK DAM: A CASE STUDY OF XIQUANYAN DAM IN CHINA

    Directory of Open Access Journals (Sweden)

    Qingqing GUO

    2016-07-01

    . The earth-rock dam of Xiquanyan Reservoir near Harbin city in China is also selected as case study to illustrate the described method.

  15. Public safety around dams : Grand River Conservation Authority

    Energy Technology Data Exchange (ETDEWEB)

    Moore, N [Grand River Conservation Authority, Cambridge, ON (Canada)

    2009-07-01

    Ontario's Grand River Conservation Authority (GRCA) is a corporate body, through which municipalities, landowners and other organizations work cooperatively to manage the watershed and outdoor recreation. This involves reducing flood damage; improving water quality; providing adequate water supply; protecting natural areas; watershed planning; and environmental education. This presentation discussed public safety issues regarding a dam in the GRCA that is 5 minutes to downtown Brantford; 5 minutes to several elementary and secondary schools; and a popular area for anglers. The city of Brantford owns the east embankment and the Brant conservation area is located on the west embankment. The safeguards included measures to involve the municipality and local police; install better signage; install better fencing; and public education. Increasing public awareness of the dangers surrounding dams was an important point of the presentation. Results included reduced trespassing and greater community awareness. figs.

  16. Japan`s largest composition dam, aiming for harmony with nature. Chubetsu dam; Shizen tono chowa wo mezasu, Nippon ichi no fukugo dam. Chubetsu dam

    Energy Technology Data Exchange (ETDEWEB)

    Mizushima, T. [Hokkaido Development Bureau, Hokkaido Development Agency, Sapporo (Japan)

    1994-08-15

    This paper introduces Chubetsu Dam planned with a large-scale embankment having a river bed width of 600 m. Chubetsu Dam is being constructed with such objectives as flood control of Ishikari River, river flow rate maintenance, drinking water supply, irrigation water supply and power generation. The dam site is a gravel bed having a river bed width of 600 m and a maximum foundation rock thickness of 40 m, requiring evaluations as a dam foundation and discussions of water shielding methods. As a result of discussions at the Chubetsu Dam technical discussion committee, the dam type is decided to be a composition dam consisting of a gravity type concrete dam on the left river side and a central core type fill dam using a part of the gravel bed as the foundation on the right river side. A continuous underground wall system is planned to be used for shielding water in the gravel foundation. In discussing the anti-seismic properties, analyses for bank construction and water filling to derive stress and deformation conditions prior to an earthquake and a time-history response analysis to derive conditional changes during the earthquake are performed. According to the results thereof, evaluations are given on the safety by compounding the stress and the acceleration. In plans to improve the surrounding areas, an area will be provided upstream the reservoir where the water level is kept constant to serve as a bird sanctuary. 7 figs.

  17. Safety Aspects of Sustainable Storage Dams and Earthquake Safety of Existing Dams

    Directory of Open Access Journals (Sweden)

    Martin Wieland

    2016-09-01

    Full Text Available The basic element in any sustainable dam project is safety, which includes the following safety elements: ① structural safety, ② dam safety monitoring, ③ operational safety and maintenance, and ④ emergency planning. Long-term safety primarily includes the analysis of all hazards affecting the project; that is, hazards from the natural environment, hazards from the man-made environment, and project-specific and site-specific hazards. The special features of the seismic safety of dams are discussed. Large dams were the first structures to be systematically designed against earthquakes, starting in the 1930s. However, the seismic safety of older dams is unknown, as most were designed using seismic design criteria and methods of dynamic analysis that are considered obsolete today. Therefore, we need to reevaluate the seismic safety of existing dams based on current state-of-the-art practices and rehabilitate deficient dams. For large dams, a site-specific seismic hazard analysis is usually recommended. Today, large dams and the safety-relevant elements used for controlling the reservoir after a strong earthquake must be able to withstand the ground motions of a safety evaluation earthquake. The ground motion parameters can be determined either by a probabilistic or a deterministic seismic hazard analysis. During strong earthquakes, inelastic deformations may occur in a dam; therefore, the seismic analysis has to be carried out in the time domain. Furthermore, earthquakes create multiple seismic hazards for dams such as ground shaking, fault movements, mass movements, and others. The ground motions needed by the dam engineer are not real earthquake ground motions but models of the ground motion, which allow the safe design of dams. It must also be kept in mind that dam safety evaluations must be carried out several times during the long life of large storage dams. These features are discussed in this paper.

  18. Evolution of environmental protection strategies in the Soviet Union

    International Nuclear Information System (INIS)

    Lesperance, A.M.

    1992-05-01

    In performing this work, interviews were conducted with members of the Supreme Soviet Committee for Rational Use of Natural Resources, Moscow, City Council, and St. Petersburg City Council. These officials provided their views on the current status of environmental protection in the former Soviet Union. Literature published in English, although limited, supplemented these discussions. In addition, a literature search was conducted of recent articles about this topic. Although the research for this paper was conducted before and during the August 1991 coup attempt in the Soviet Union, and after the formation of the Commonwealth of Independent States (CIS), many of the observations expressed in this report may be relevant to the new states. This report provides to historical perspective on the barriers encountered while attempting to develop environmental policy in the former Soviet Union and establishes a context for problems facing the new states in developing their environmental policies. Organization changes that have occurred in environmental protection since the August coup are included to the extent they are known

  19. Damming evidence : Canada and the World Commission on Dams

    Energy Technology Data Exchange (ETDEWEB)

    Vert, P.; Parkinson, B.

    2003-06-01

    Large hydroelectric projects have been met with strong resistance from affected communities, particularly indigenous groups who have been displaced from their flooded communities following the damming of a river. The World Commission on Dams (WCD) was formed in 1998 to review the effectiveness of large dams and develop internationally acceptable guidelines and standards for large dams or hydro energy projects. The Canadian government, through the Canadian International Development Agency, was one of many governments to fund the WCD. However, the authors argue that despite the financial support, the Canadian government was absent from any effort to follow-up on the recommendations of the WCD. The seven strategic priorities in the decision making process include: (1) gaining public acceptance, (2) comprehensive option assessment of water, energy, food and development needs, (3) addressing existing dams to improve the benefits that can be derived from them, (4) sustaining livelihoods, (5) recognizing the entitlements and sharing benefits, (6) ensuring compliance, and (7) sharing rivers for peace, development and security. This report offers a means to assess planned or existing dams and presents a set of guidelines for good practices linked to the seven strategic priorities. Ten case studies from around the world were presented, including the Three Gorges Dam in China. 154 refs., 3 figs., 3 appendices.

  20. Proceedings of the Canadian Dam Association's 2006 annual conference: dams: past, present and future

    International Nuclear Information System (INIS)

    2006-01-01

    This conference addressed particular technical challenges regarding the operation of dams with particular focus on best practices for improving dam management and safety. It featured 4 workshops and a technical program led by experts on dams and tailings facilities that addressed topics such as dam construction, design and rehabilitation; dam management in a hydrological uncertainty context; monitoring, instrumentation and maintenance; dam behaviour; dam safety, dam failure and practical approaches to emergency preparedness planning for dam owners; historical aspects and environmental issues and conflicting water use. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and dam safety guidelines for extreme flood analyses and their applications. All 80 presentations from this conference have been catalogued separately for inclusion in this database. refs., tabs., figs

  1. Proceedings of the 2010 Canadian Dam Association's public safety around dams workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Nearly 30 people have drowned in dam-related incidents over the last 10 years in Canada. The Canadian public is now calling for improved safety guidelines. Public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. However, many members of the public are not aware of the dangers posed by dams. This workshop provided a forum to discuss proposals for a draft publication of the Canadian Dam Association (CDA) guidelines for public safety and security around dams. Issues related to current legislation and liability were discussed. Methods of increasing public awareness of the hazards posed by dams included increased signage in dam locations, the use of audible and visual alert systems, and the use of booms and buoys. The responsibilities of dam owners in ensuring the safety of dams were also discussed. The conference featured 5 presentations, of which 2 have been catalogued separately for inclusion in this database. tabs., figs.

  2. The Dams and Monitoring Systems and Case Study: Ataturk and Karakaya Dams

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.; Gülnerman, A. G.

    2017-12-01

    Dams are among the most important engineering structures used for flood controls, agricultural purposes as well as drinking and hydroelectric power. Especially after the Second World War, developments on the construction technology, increase the construction of larger capacity dams. There are more than 150.000 dams in the world and almost 1000 dams in Turkey, according to international criteria. Although dams provide benefits to humans, they possess structural risks too. To determine the performance of dams on structural safety, assessing the spatial data is very important. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some general information on dams and their different monitoring systems by taking into account two different dams and their structural specifications with the required information. The case study in this paper depends on a comparison of the monitoring surveys on Atatürk Dam and Karakaya Dam, which are constructed on Firat River with two different structural

  3. 75 FR 20874 - Union Pacific Railroad Company-Abandonment Exemption-in Orange County, CA

    Science.gov (United States)

    2010-04-21

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [STB Docket No. AB-33 (Sub-No. 281X)] Union Pacific Railroad Company--Abandonment Exemption--in Orange County, CA Union Pacific Railroad....65 near the City of Brea, in Orange County, CA. The line traverses United States Postal Service Zip...

  4. An engineering geological appraisal of the Chamshir dam foundation using DMR classification and kinematic analysis, southwest of Iran

    Directory of Open Access Journals (Sweden)

    Torabi Kaveh Mehdi

    2011-12-01

    Full Text Available This paper describes the results of engineering geological  investigations and rock mechanics studies carried out at the proposed Chamshir dam site. It is proposed that a 155 m high solid concrete gravity-arc dam be built across the Zuhreh River to the southeast of the city of Gachsaran in south-western Iran. The dam and its associated structures are mainly located on the Mishan formation. Analysis consisted of rock mass classification and a kinematic
    analysis of the dam foundation's rock masses. The studies were carried out in the field and the laboratory. The field studies included geological mapping, intensive discontinuity surveying, core drilling and sampling for laboratory testing. Rock mass classifications were made in line with RMR and DMR classification for the dam foundation. Dam foundation analysis regarding stability using DMR classification and kinematic analysis indicated that the left abutment's rock foundation (area 2 was unstable for planar, wedge and toppling failure modes.

  5. Research on Safety Factor of Dam Slope of High Embankment Dam under Seismic Condition

    Directory of Open Access Journals (Sweden)

    Li Bin

    2015-01-01

    Full Text Available With the constant development of construction technology of embankment dam, the constructed embankment dam becomes higher and higher, and the embankment dam with its height over 200m will always adopt the current design criteria of embankment dam only suitable for the construction of embankment dam lower than 200m in height. So the design criteria of high embankment dam shall be improved. We shall calculate the stability and safety factors of dam slope of high embankment dam under different dam height, slope ratio and different seismic intensity based on ratio of safety margin, and clarify the change rules of stability and safety factors of dam slope of high embankment dam with its height over 200m. We calculate the ratio of safety margin of traditional and reliable method by taking the stable, allowable and reliability index 4.2 of dam slope of high embankment dam with its height over 200m as the standard value, and conduct linear regression for both. As a result, the conditions, where 1.3 is considered as the stability and safety factors of dam slope of high embankment dam with its height over 200m under seismic condition and 4.2 as the allowable and reliability index, are under the same risk control level.

  6. 78 FR 34160 - Union Pacific Railroad Company-Abandonment Exemption-In Iron County, Utah

    Science.gov (United States)

    2013-06-06

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. AB 33 (Sub-No. 283X)] Union Pacific Railroad Company--Abandonment Exemption--In Iron County, Utah Union Pacific Railroad Company (UP... Cedar City, a total distance of 1.03 miles in Iron County, Utah (the Line). The Line traverses United...

  7. Dams designed to fail

    Energy Technology Data Exchange (ETDEWEB)

    Penman, A. [Geotechnical Engineering Consultants, Harpenden (United Kingdom)

    2004-09-01

    New developments in geotechnical engineering have led to methods for designing and constructing safe embankment dams. Failed dams can be categorized as those designed to fail, and those that have failed unexpectedly. This presentation outlined 3 dam failures: the 61 m high Malpasset Dam in France in 1959 which killed 421; the 71 m high Baldwin Hills Dam in the United States in 1963 which killed 5; and, the Vajont Dam in Italy in 1963 which killed 2,600 people. Following these incidents, the International Commission for Large Dams (ICOLD) reviewed regulations on reservoir safety. The 3 dams were found to have inadequate spillways and their failures were due to faults in their design. Fuse plug spillways, which address this problem, are designed to fail if an existing spillway proves inadequate. They allow additional discharge to prevent overtopping of the embankment dam. This solution can only be used if there is an adjacent valley to take the additional discharge. Examples of fuse gates were presented along with their effect on dam safety. A research program is currently underway in Norway in which high embankment dams are being studied for overtopping failure and failure due to internal erosion. Internal erosion has been the main reason why dams have failed unexpectedly. To prevent failures, designers suggested the use of a clay blanket placed under the upstream shoulder. However, for dams with soft clay cores, these underblankets could provide a route for a slip surface and that could lead to failure of the upstream shoulder. It was concluded that a safe arrangement for embankment dams includes the use of tipping gates or overturning gates which always fail at a required flood water level. Many have been installed in old and new dams around the world. 14 refs., 19 figs.

  8. Management of dams for the next Millennium: proceedings of the 1999 Canadian Dam Association

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The meeting featured seven sessions with 18 papers abstracted/indexed therein as follows: keynote address: tailings dams safety - implications for the dam safety community; 1 - design and performance: performance monitoring of dams: are we doing what we should be doing?; tailings dams from the perspective of conventional dam engineering; and design overview of Syncrude's Mildred Lake east toe berm; 2 - design and modelling: use of a 2D model for a dam break study on the ALCAN hydroelectric complex in Quebec; and spillway design implications resulting from changes in rainfall extremes; 3 - risk and dam safety I: closing the gaps in the dam safety guidelines; the reality of life safety consequence classification; and surveillance practices for the next millenium; 4 - risk and dam safety II: quantitative risk-assessment using the capacity-demand analysis; and new guidelines for dam safety classification; 5 - millenium issues: expectations of immortality, dam safety management into the next millenium; 6 - rehabilitation techniques: the unconventional application of conventional materials; nondestructive testing technology to characterize concrete dam/bedrock interface; method and instrument for detecting crack in concrete; and grouting of the cracks in the Arch 5-6 - Daniel Johnson Dam; and 7 - case studies: rehabilitation of an 80 year old Ambursen type dam; and debris booms for the protection of spillways.

  9. Evaluating safety of concrete gravity dam on weak rock: Scott Dam

    International Nuclear Information System (INIS)

    Goodman, R.E.; Ahlgren, C.S.

    2000-01-01

    Scott Dam is owned and operated by Pacific Gas and Electric Co. (PG and E) as part of the Potter Valley Project. Although it is an unimpressive concrete gravity dam [233 m (765 ft) long with maximum water surface 33.4 m (110 ft) above tail water], the dam has unusually complex and weak foundation rocks; thick condition caused design changes during construction, numerous subsequent special investigations, and several corrections and additions. A main stumbling block to clarification of the dam safety issue for Scott Dam has always been difficulty in characterizing the foundation material. This paper discusses an approach to this problem as well s how the safety of the dam was subsequently confirmed. Following a comprehensive program of research, investigations, and analysis from 1991 to 1997

  10. Putting Roman Dams in Context: a Virtual Approach

    Science.gov (United States)

    Decker, M. J.; Du Vernay, J. P.; Mcleod, J. B.

    2017-08-01

    Water resources and management have become a critical global issue. During the half-millennium of its existence, the Roman Empire developed numerous strategies to cope with water management, from large-scale urban aqueduct systems, to industrial-scale water mills designed to cope with feeding growing city populations. Roman engineers encountered, adopted, and adapted indigenous hydraulic systems, and left lasting imprints on the landscape of the Mediterranean and temperate Western Europe by employing a range of water technologies. A recent academic study has enabled the identification of remains of and references to seventy-two dams from the Roman era, constructed in Spain between the 1st and 4th century AD. Such unique heritage, without comparisons in the Mediterranean makes Spain an emblematic case study for the analysis of Roman hydraulic engineering and water management policies. Fifty dams have been located and detailed. The twenty-two outstanding, although identified on the ground, have not been able to be acceptably characterized, due in some cases to their being ruins in a highly degraded state, others due to their being masked by repairs and reconstructions subsequent to the Roman era. A good example of such neglected dams is the buttress dam of Consuegra , in Toledo province (Castilla-La Mancha). Dating to the 3rd - 4th century AD, the Dam of Consuegra, on the basin of the Guadiana, with its over 600 metres length and 4,80 metres height, is a remarkable case of Roman engineering mastery. It had a retaining wall upstream, numerous buttresses and perhaps an embankment downstream, of which no remains are left. The application of 3D digital imaging technique to create a high quality virtual model of such monuments has proved to be successful especially for the study of the technological aspects related its construction. The case study of the Roman dam of Muel (Zaragoza) has shown, in fact, as best practices in digital archaeology can provide an original and

  11. Dam removal: Listening in

    Science.gov (United States)

    Foley, M. M.; Bellmore, J. R.; O'Connor, J. E.; Duda, J. J.; East, A. E.; Grant, G. E.; Anderson, C. W.; Bountry, J. A.; Collins, M. J.; Connolly, P. J.; Craig, L. S.; Evans, J. E.; Greene, S. L.; Magilligan, F. J.; Magirl, C. S.; Major, J. J.; Pess, G. R.; Randle, T. J.; Shafroth, P. B.; Torgersen, C. E.; Tullos, D.; Wilcox, A. C.

    2017-07-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  12. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H. [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  13. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  14. Dam failure analysis for the Lago El Guineo Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Gómez-Fragoso, Julieta; Heriberto Torres-Sierra,

    2016-08-09

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed hydrologic and hydraulic analyses to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago El Guineo Dam. The Lago El Guineo Dam is within the headwaters of the Río Grande de Manatí and impounds a drainage area of about 4.25 square kilometers.The hydrologic assessment was designed to determine the outflow hydrographs and peak discharges for Lago El Guineo and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation event, (2) a 24-hour probable maximum precipitation event, and (3) a 24-hour, 100-year recurrence rainfall event. The hydraulic study simulated a dam failure of Lago El Guineo Dam using flood hydrographs generated from the hydrologic study. The simulated dam failure generated a hydrograph that was routed downstream from Lago El Guineo Dam through the lower reaches of the Río Toro Negro and the Río Grande de Manatí to determine water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” conditions. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC–HMS) and Hydrologic Engineering Center’s River Analysis System (HEC–RAS) computer programs, developed by the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was completed using the unsteady flow module available in the HEC–RAS model.Above the Lago El Guineo Dam, the simulated inflow peak discharges from HEC–HMS resulted in about 550 and 414 cubic meters per second for the 6- and 24-hour probable maximum precipitation events, respectively. The 24-hour, 100-year recurrence storm simulation resulted in a peak discharge of about 216 cubic meters per second. For the hydrologic analysis, no dam failure conditions are

  15. Bed Degradation and Sediment Export from the Missouri River after Dam Construction and River Training: Significance to Lower Mississippi River Sediment Loads

    Science.gov (United States)

    Blum, M. D.; Viparelli, E.; Sulaiman, Z. A.; Pettit, B. S.

    2016-12-01

    More than 40,000 dams have been constructed in the Mississippi River drainage basin, which has had a dramatic impact on suspended sediment load for the Mississippi delta. The most significant dams were constructed in the 1950s on the Missouri River in South Dakota, after which total suspended loads for the lower Mississippi River, some 2500 km downstream, were cut in half: gauging station data from the Missouri-Mississippi system show significant load reductions immediately after dam closure, followed by a continued downward trend since that time. The delta region is experiencing tremendous land loss in response to acceleration of global sea-level rise, and load reductions of this magnitude may place severe limits on mitigation efforts. Here we examine sediment export from the Missouri system due to bed scour. The US Army Corps of Engineers has compiled changes in river stage at constant discharge for 8 stations between the lowermost dam at Yankton, South Dakota and the Missouri-Mississippi confluence at St. Louis (a distance of 1250 river km), for the period 1930-2010, which we have updated to 2015. These data show two general reaches of significant bed degradation. The first extends from the last major dam at Yankton, South Dakota downstream 300 km to Omaha, Nebraska, where degradation in response to the dam exceeds 3 m. The second reach, with >2.5 m of degradation, occurs in and around Kansas City, Missouri, and has been attributed to river training activities. The reach between Omaha and Kansas City, as well as the lower Missouri below Kansas City, show River due to bed scour following dam construction and river training. This number equates to 20-25 million tons per year, which is sufficient to account for 30% of the total Missouri River load, and 15% of the total post-dam annual sediment load for the lower Mississippi River. For perspective, the quantity of sediment exported from the Missouri River due to bed scour is greater than the total load for all

  16. Inferring Anthropogenic Trends from Satellite Data for Water-sustainability of US Cities Near Artificial Reservoirs

    Science.gov (United States)

    Yigzaw, W. Y.; Hossain, F.

    2015-12-01

    Impact of anthropogenic activities on water cycle and water supply has different effects at global and regional spatial scales, ensuing the need for a design and water management approach that considers anthropogenic inputs. One of the major inputs in local-to-regional availability of water and the water cycle are land use land cover change as a result of urbanization, artificial reservoirs and irrigation activity. This study employed a multi-factorial approach involving population trends, water use (and demand), streamflow; and various satellite derived water-relevant variables. These variables are: daily precipitation (from TRMM, 3B42.V7), Normalized Difference Vegetation Index-NDVI (from MODIS-MOD13A1), land surface temperature-LST (from MODIS-MOD11A2), and land cover (MODIS-MCD12Q1). Long terms exhibited by such data were used to understand temporal and spatial trends in impounded watersheds hosting a large and growing city in its proximity. The selected cities are: City of Atlanta-Georgia and Buford dam; Columbia-South Carolina and Saluda dam; Columbus-Ohio and Alum Creek dam; Montgomery-Alabama and Jordan dam; Tulsa-Oklahoma and Keystone dam; Tuscaloosa-Alabama and Tuscaloosa dam were selected. our study reveals that daily mean stream flow has been decreasing in all but one (Tulsa) of the areas selected. Satellite data trends between 2000 and 2012 showed a steady decrease in precipitation and NDVI; while LST has gradually increased. We attribute the NDVI (i.e., gradual decrease in vegetation cover) to LST rather than precipitation trends. The results of this research suggested that future temperature projection from climate models can be used in understanding vegetation activity and water availability over the study areas. Cities with larger upstream watershed area are potentially more sustainable and resilient (than those with small watersheds) as a result of spatial variability of water resources' response to climate change. Inter-basin water resources

  17. Regional impact of climate on Japanese encephalitis in areas located near the three gorges dam.

    Directory of Open Access Journals (Sweden)

    Yuntao Bai

    Full Text Available BACKGROUND: In this study, we aim to identify key climatic factors that are associated with the transmission of Japanese encephalitis virus in areas located near the Three Gorges Dam, between 1997 and 2008. METHODS: We identified three geographical regions of Chongqing, based on their distance from the Three Gorges Dam. Collectively, the three regions consisted of 12 districts from which study information was collected. Zero-Inflated Poisson Regression models were run to identify key climatic factors of the transmission of Japanese encephalitis virus for both the whole study area and for each individual region; linear regression models were conducted to examine the fluctuation of climatic variables over time during the construction of the Three Gorges Dam. RESULTS: Between 1997 and 2008, the incidence of Japanese encephalitis decreased throughout the entire city of Chongqing, with noticeable variations taking place in 2000, 2001 and 2006. The eastern region, which is closest to the Three Gorges Dam, suffered the highest incidence of Japanese encephalitis, while the western region experienced the lowest incidence. Linear regression models revealed that there were seasonal fluctuations of climatic variables during this period. Zero-Inflated Poisson Regression models indicated a significant positive association between temperature (with a lag of 1 and 3 months and Japanese encephalitis incidence, and a significant negative association between rainfall (with a lag of 0 and 4 months and Japanese encephalitis incidence. CONCLUSION: The spatial and temporal trends of Japanese encephalitis incidence that occurred in the City of Chongqing were associated with temperature and rainfall. Seasonal fluctuations of climatic variables during this period were also observed. Additional studies that focus on long-term data collection are needed to validate the findings of this study and to further explore the effects of the Three Gorges Dam on Japanese

  18. SOLUTION FOR ICHTHYOFAUNA MIGRATION UPSTREAM- DOWNSTREAM OF THE TWO SPILLWAYS LOCATED NEAR MANASTUR DAM ON THE SOMESUL MIC RIVER IN THE CLUJ NAPOCA CITY (ROMÂNIA

    Directory of Open Access Journals (Sweden)

    Razvan VOICU

    2015-06-01

    Full Text Available Longitudinal connectivity represent the way in which organisms move the energy and material exchanges located throughout the water. Fragmentation the longitudinal connectivity of watercourses caused by dams or other hydrotechnical constructions represent a major impact on sediment transport, hydrological regime, downstream moving and biota migration. The hydromorphological elements (river continuity, as well as chemical, biological, physicochemical elements characterize the ecological status of rivers.Migratory fish species: nase (Chondrostoma nasus - protected by Bern Convention - Appendix III and barbel (Barbus barbus - rare species, protected Habitats Directive (Annex V, annex 4A of Low nr.462 and Red List of RBDD are blocked but the Hydrotechnical constructions (discharge sills, dams etc located across the watercourse Somes Mic River. One of the important think of this system is the gravitational fall of water. This solution will lead to the restoration of the longitudinal connection of the Someşul Mic River in the Manastur neighborhood. România is part of the European Union and it has the obligation to implement the provisions of the Water Framework Directive 2000/60/EC, transposed into Romanian legislation by the Water Law 107/1996 as supplemented and amended (Act 310/2004. This engineering solution for fish fauna migration upstream – downstream of the spillways supports the Water Framework Directive 2000/60/EC, transposed into Romanian legislation by the Water Law 107/1996 as supplemented and amended (Act 310/2004.

  19. Teton Dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Snorteland, N. [United States Dept. of the Interior, Washington, DC (United States). Bureau of Reclamation

    2009-07-01

    This case summary discussed an internal erosion failure that occurred at the embankment foundation of Teton Dam. The project was designed as a run-of-the-river power generation facility and to provide irrigation, flood protection, and power generation to the lower Teton region of southern Idaho. The dam site was located next to the eastern Snake River plain, a volcanic filled depression. The foundation's cutoff trench was excavated into the bedrock along the length of the dam. The dam was designed as a zoned earthfill with a height of 305 feet. A trench made of low plasticity windblown silt was designed to connect the embankment core to the rock foundation. Seeps were noted in 1976, and a leak was observed near the toe of the dam. A wet spot appeared on the downstream face of the dam at elevation 5200. A sinkhole then developed. The embankment crest collapsed, and the dam breached. Peak outflow was estimated at 1,000,000 cfs. The failure was attributed to a lack of communication between designers, a failure to understand geologic information about the region, and an insufficient review of designs and specifications by designers and field personnel. No monitoring instrumentation was installed in the embankment. Approximately 300 square miles were inundated, and 25,000 people were displaced. Eleven people were killed. A review group noted that the rock surface was not adequately sealed, and that the dam failed as a result of inadequate protection of the impervious core material from internal erosion. 42 figs.

  20. How big of an effect do small dams have? Using geomorphological footprints to quantify spatial impact of low-head dams and identify patterns of across-dam variation

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Costigan, Katie H.; Daniels, Melinda D.

    2015-01-01

    Longitudinal connectivity is a fundamental characteristic of rivers that can be disrupted by natural and anthropogenic processes. Dams are significant disruptions to streams. Over 2,000,000 low-head dams (research and conservation is impaired by not knowing the magnitude of low-head dam impacts. Based on the geomorphic literature, we refined a methodology that allowed us to quantify the spatial extent of low-head dam impacts (herein dam footprint), assessed variation in dam footprints across low-head dams within a river network, and identified select aspects of the context of this variation. Wetted width, depth, and substrate size distributions upstream and downstream of six low-head dams within the Upper Neosho River, Kansas, United States of America were measured. Total dam footprints averaged 7.9 km (3.0–15.3 km) or 287 wetted widths (136–437 wetted widths). Estimates included both upstream (mean: 6.7 km or 243 wetted widths) and downstream footprints (mean: 1.2 km or 44 wetted widths). Altogether the six low-head dams impacted 47.3 km (about 17%) of the mainstem in the river network. Despite differences in age, size, location, and primary function, the sizes of geomorphic footprints of individual low-head dams in the Upper Neosho river network were relatively similar. The number of upstream dams and distance to upstream dams, but not dam height, affected the spatial extent of dam footprints. In summary, ubiquitous low-head dams individually and cumulatively altered lotic ecosystems. Both characteristics of individual dams and the context of neighboring dams affected low-head dam impacts within the river network. For these reasons, low-head dams require a different, more integrative, approach for research and management than the individualistic approach that has been applied to larger dams.

  1. Union banking a step towards achieving fiscal Union in the European Union

    Directory of Open Access Journals (Sweden)

    Ionuţ Marius Croitoru

    2015-05-01

    Full Text Available Introduction: Union policy needs in addition to the official language of four major components: a monetary union, a fiscal union, a union diplomatic and military union A stage in the Union is the Union banking tax. Materials and Methods: Union Bank has three pillars: a single banking supervisor (single supervisory mechanism, the only mechanism of bank resolution and a single scheme of bank guarantees. Results and conclusions: Union Bank, strengthen supervision is an inevitable process, and Romania will have to enroll in it. Option Romania is to be part of Romania deaorece bank Union can not remain outside the structures of decision as long as banks operating in Romania are predominantly Eurozone.

  2. Mechanics of slide dams

    International Nuclear Information System (INIS)

    Young, G.A.

    1970-01-01

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  3. Mechanics of slide dams

    Energy Technology Data Exchange (ETDEWEB)

    Young, G A [Engineering, Agbabian-Jacobsen Associates, Los Angeles (United States)

    1970-05-15

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  4. Dam break analysis and flood inundation map of Krisak dam for emergency action plan

    Science.gov (United States)

    Juliastuti, Setyandito, Oki

    2017-11-01

    The Indonesian Regulation which refers to the ICOLD Regulation (International Committee on Large Dam required have the Emergency Action Plan (EAP) guidelines because of the dams have potential failure. In EAP guidelines there is a management of evacuation where the determination of the inundation map based on flood modeling. The purpose of the EAP is to minimize the risk of loss of life and property in downstream which caused by dam failure. This paper will describe about develop flood modeling and inundation map in Krisak dam using numerical methods through dam break analysis (DBA) using hydraulic model Zhong Xing HY-21. The approaches of dam failure simulation are overtopping and piping. Overtopping simulation based on quadrangular, triangular and trapezium fracture. Piping simulation based on cracks of orifice. Using results of DBA, hazard classification of Krisak dam is very high. The nearest village affected dam failure is Singodutan village (distance is 1.45 kilometer from dam) with inundation depth is 1.85 meter. This result can be used by stakeholders such as emergency responders and the community at risk in formulating evacuation procedure.

  5. Spruce Lake Dam reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, G. [SGE Acres Ltd., Fredericton, NB (Canada); Barnard, J. [SGE Acres Ltd., St. John' s, NF (Canada); Vriezen, C. [City of Saint John, NF (Canada); Stephenson, M. [Jacques Whitford Environment Ltd., Fredericton, NB (Canada)

    2004-09-01

    Spruce Lake Dam was constructed in 1898 as part of the water supply system for Saint John, New Brunswick. The original dam was a 6 meter high, 140 meter long concrete gravity dam with an intake structure at its mid point and an overflow spillway at the left abutment. A rehabilitation project was launched in 2001 to bring the deteriorated dam into conformance with the dam safety guidelines of the Canadian Dam Association. The project criteria included minimal disruption to normal operation of water supply facilities and no negative effect on water quality. The project involved installation of a new low level outlet, removal of a gate house and water intake pipes, replacement of an access road culvert in the spillway channel, and raising the earth dam section by 1.8 meters to allow for increased water storage. The new raised section has an impervious core. The project also involved site and geotechnical investigations as well as hydrotechnical and environmental studies. This presentation described the final design of the remedial work and the environmental permitting procedures. Raising the operating level of the system proved successful as demonstrated by the fewer number of pumping days required after dam rehabilitation. The dam safety assessment under the Canadian Environmental Assessment Act began in April 2001, and the rehabilitation was completed by the end of 2002. 1 tab., 8 figs.

  6. Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.

    2014-12-01

    Turkey has 595 dams constructed between 1936 and 2013 for the purposes of irrigation, flood control, hydroelectric energy and drinking water. A major portion of the dam basins in Turkey are deprived of vegetation and have slope topography on near surrounding area. However, landscaping covered with forest around the dam basin is desirable for erosion control. In fact; the dams, have basins deprived of vegetation, fill up quickly due to sediment transport. Erosion control and forestation are important factors, reducing the sediment, to protect the water basins of the dams and increase the functioning life of the dams. The functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Dams are very large and critical structures and they demand the use or application of precise measuring systems. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. Monitoring is an essential component of the dam after construction and during operation and must en­able the timely detection of any behavior that could deteriorate the dam, potentially result in its shutdown or failure. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the small structural motions at regular intervals could be comprehended. This study provides some information, safety and the techniques about the deformation monitoring of the dams, dam safety and related analysis. The case study is the deformation measurements of Atatürk Dam in Turkey which is the 6th largest dam of world considering the filling volume of embankment. Brief information is given about the

  7. Small dams need better management

    Science.gov (United States)

    Balcerak, Ernie

    2012-03-01

    Many small dams around the world are poorly maintained and represent a safety hazard, according to Pisaniello et al. Better oversight of small dams is needed, the authors argue. The researchers reviewed literature, conducted case studies in four states in Australia, and developed policy benchmarks and best practices for small-dam management. Small dams, often just several meters high and typically privately owned by individual farmers, have historically caused major damage when they fail. For instance, in China in 1975, 230,000 people died when two large dams failed because of the cumulative failure of 60 smaller upstream dams. In the United States, in 1977 the 8-meter-high Kelly Barnes Lake dam failed, killing 39 people. Many other small-dam failures around the world have resulted in casualties and severe ecological and economic damage.

  8. The Impact of Dam-Reservoir-Foundation Interaction on Nonlinear Response of Concrete Gravity Dams

    International Nuclear Information System (INIS)

    Amini, Ali Reza; Motamedi, Mohammad Hossein; Ghaemian, Mohsen

    2008-01-01

    To study the impact of dam-reservoir-foundation interaction on nonlinear response of concrete gravity dams, a two-dimensional finite element model of a concrete gravity dam including the dam body, a part of its foundation and a part of the reservoir was made. In addition, the proper boundary conditions were used in both reservoir and foundation in order to absorb the energy of outgoing waves at the far end boundaries. Using the finite element method and smeared crack approach, some different seismic nonlinear analyses were done and finally, we came to a conclusion that the consideration of dam-reservoir-foundation interaction in nonlinear analysis of concrete dams is of great importance, because from the performance point of view, this interaction significantly improves the nonlinear response of concrete dams

  9. Local level sustainability policies in the Baltic Sea area: Local Agenda 21 within the Union of the Baltic Cities network.

    Science.gov (United States)

    Joas, M; Grönholm, B

    2001-08-01

    Local Agenda 21 (LA21) processes have 2 central goals. i) On the basis of some of the empirical evidence in this study, the primary goal is to improve democratic (environmental) policy-making processes in such a manner that a larger share of the population will be able to participate in planning and decision making and will also be able to understand the consequences of these decisions. ii) The LA21 processes seek to improve (at least indirectly) the broadly defined environmental situation locally in a manner that takes into account both the local and the global contexts. The first part of this article discusses the concept and methods of LA21 and sheds light on the different action areas that are central to the Baltic LA21 processes. In addition, the study will describe and display the LA21 situation within one network of cities, the Union of the Baltic Cities (UBC). Networking, including transfer of information, models and ideas, has been among the main tools for the diffusion of LA21 ideas especially into newly democratized societies. Finally, the article will conclude with an overall assessment of the LA21 situation on the Baltic rim.

  10. Study of Dam-break Due to Overtopping of Four Small Dams in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Zakaraya Alhasan

    2015-01-01

    Full Text Available Dam-break due to overtopping is one of the most common types of embankment dam failures. During the floods in August 2002 in the Czech Republic, several small dams collapsed due to overtopping. In this paper, an analysis of the dam break process at the Luh, Velký Bělčický, Melín, and Metelský dams breached during the 2002 flood is presented. Comprehensive identification and analysis of the dam shape, properties of dam material and failure scenarios were carried out after the flood event to assemble data for the calibration of a numerical dam break model. A simple one-dimensional mathematical model was proposed for use in dam breach simulation, and a computer code was compiled. The model was calibrated using the field data mentioned above. Comparison of the erodibility parameters gained from the model showed reasonable agreement with the results of other authors.

  11. Investigation of geophysical methods for assessing seepage and internal erosion in embankment dams : a study of through-dam seismic testing at WAC Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Gaffran, P.; Jeffries, M. [BC Hydro, Burnaby, BC (Canada)

    2005-07-15

    Crosshole tomography is used to establish the distribution of seismic velocity between drill holes. The through-dam mode takes advantage of the triangular cross-section of earth embankments, obviating the need for drill holes. Seismic energy, generated on one face of the dam, passes underneath the crest and is detected by sensors arrayed on the opposite face. The sinkholes discovered at WAC Bennett Dam in 1996 provided an opportunity to test the procedure. Using p-wave energy, two series of measurements were conducted, notably one immediately before remediation of one sinkhole, and a second one shortly after the sinkhole was repaired. The known defect was successfully imaged by the first round of measurements. This report presented the results of an investigation of the through-dam seismic method using propagation of seismic waves through a dam from upstream to downstream, or vice-versa. The purpose of the study was to determine if this procedure could characterize the distribution of seismic velocity within a dam in an accurate and cost effective manner. The report presented the methods of velocity testing such as crosshole and downhole, and tomography; and through-dam measurements. Background to the Bennett Dam studies was also provided, with particular reference to the Bennett Dam sinkholes; sinkhole investigations; working hypothesis for sinkhole development; sinkhole number one characterization; and sinkhole remediation. An analysis of compression wave testing at Bennett Dam and shear wave testing was then offered. Other topics that were discussed included field test procedures; methodologies for data processing; p-waves versus s-waves; applicability of the research; and costs of through-dam surveys. It was concluded that under the right circumstances, through-dam seismic testing was capable of detecting changed conditions in an embankment dam. 15 refs., 2 tabs., 41 figs., 1 appendix.

  12. Why Here and Why Now? Teacher Motivations for Unionizing in a New Orleans Charter School

    Science.gov (United States)

    Beabout, Brian R.; Gill, Ivan

    2015-01-01

    The rigidity of teachers unions has been given as a primary reason for their lack of representation among America's rapidly growing, although still relatively small, charter school sector. In the case of post-Hurricane Katrina New Orleans, the city rapidly converted from a union-backed teacher workforce to a largely nonunionized charter school…

  13. Toru to Nukui dam construction carried out by Chugoku district construction department of Ministry of construction. Kensetsusho chugoku chiho kensetsukyoku Nukui dam koji kengakuki

    Energy Technology Data Exchange (ETDEWEB)

    Kitajima, E. (Chugoku Kayaku Co. Ltd. Hiroshima (Japan))

    1993-08-31

    This paper reports the summary of a tour to the Nukui dam being constructed on the Ota river system in Hiroshima Prefecture, as a study activity of the blasting expert working group. The Nukui dam has the second highest embankment in Japan (155 m). It adjusts flood at 1800 m[sup 3]/s from the planned high water discharge of 2900 m[sup 3]/s supplies water of 200,000 m[sup 3] daily at maximum, and generates electric power of 2300 kW as the maximum output. The blasting adopted a presplit system not to damage base rock beds, and was used with a bench height of 5 m, a hole diameter of 75 mm, a minimum shaft line of 2.5 m, and a hole distance of 2.8m. The main explosive used was the ANFO, No. 3 Kiri, Akatsuki dynamite. Slurry explosives were used for the presplit. Drilling machines with three-dimensional computers were used. The 'Nukui Dam Work Station' is the country's first site office/lodgings integrated facility offering as comfortable working environment as a city hotel. The facility is expected to wipe out the dirty, dangerous and hard image of construction work. 1 ref., 3 figs.

  14. Perspectives on dam safety in Canada

    International Nuclear Information System (INIS)

    Halliday, R.

    2004-01-01

    Canadian dam safety issues were reviewed from the perspective of a water resources engineer who is not a dam safety practitioner. Several external factors affecting dam safety were identified along with perceived problems in dam safety administration. The author claims that the main weakness in safety practices can be attributed to provincial oversights and lack of federal engagement. Some additions to the Canadian Dam Safety Guidelines were proposed to address these weaknesses. Canada has hundreds of large dams and high hazard dams whose failure would result in severe downstream consequences. The safety of dams built on boundary waters shared with the United States have gained particular attention from the International Joint Commission. This paper also examined safety criteria for concerns such as aging dams, sabotage and global climate change that may compromise the safety of a dam. 26 refs

  15. Politic culture’s impact on effectiveness of istanbul city councils

    OpenAIRE

    Bahadır Şahin

    2012-01-01

    City councils are governance platforms proposed through a number of European Union accession negotiations as decentralization devices in order to implement policies for benefit of the public. Regulation establishing city councils puts out the objectives of the policy as "development of a city vision and consciousness of citizenship, protection of the city's rights and social order, providing sustainable development, environmental sensitivity, social assistance and solidarity, and implementati...

  16. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Science.gov (United States)

    2013-08-29

    ... Bar Dams AGENCY: Tennessee Valley Authority. ACTION: Issuance of Record of Decision. SUMMARY: This... the dam safety modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams. The notice of... Loudoun, Tellico, and Watts Bar Dams was published in the Federal Register on May 31, 2013. This...

  17. Aging in the Soviet Union: A West Siberian Perspective.

    Science.gov (United States)

    Demitri, Shimkin

    1989-01-01

    Presents ethnographic observations on the aged and aging from six months' residence in Siberian industrial city. Describes interactions with medical personnel and reviews scanty literature in Soviet Union. Notes integration of aged in families and respect given to older persons. Discusses problems of elderly caused by hard living conditions,…

  18. Perspectives and expectations of union member and non- union member teachers on teacher unions

    Directory of Open Access Journals (Sweden)

    Tuncer FİDAN

    2015-12-01

    Full Text Available Unions, which can be regarded as one of the constitutive elements of democracy, are the pressure groups in political and social fields. Unions were born out of industrial confrontations and expanded into the field of public services over time, and thus teachers – who are also public employees-, also obtained the right to establish and affiliate to unions. In this research the views of union member and non-union member teachers on the most important functions and operational effectiveness of unions, teachers’ expectations from unions and teachers’ evaluation of the solidarity, competition and cooperation between unions were determined and the perspectives of teachers on unionization were revealed. qualitative research design was used. The data needed were collected through semi-structured interviews from volunteering union member and non-union member teachers who were working in the primary and secondary schools in Ankara province and who were selected through “maximum variation sampling approach”. The data were then analyzed by using the content analysis technique. In conclusion, it was found that political ideology was the most important reason for membership of teachers’ unions. Protection and development of personal rights was found to be the most important function of teacher unions and unions were thought to be insufficient in performing those functions.

  19. National Dam Safety Program. Bayman Dam - No Name 381 (MO 20240), Missouri - Kansas City Basin, Jackson County, Missouri. Phase I Inspection Report.

    Science.gov (United States)

    1978-08-01

    broad - crested weir equation and the sharp crested circular... weir equation. Broad - crested weir equation: Q = CLH 1 .5 (C = varies, L = varies, H is the head on weir ). Circular weir equation: Q = C0 2rR (H0 )5 (C0...the toe of the downstream embankment. The spillway inlet is about 25 feet upstream of the crest of the dam. (3) Pertinent physical data are given

  20. Investigation on the Causes of Cracking in Earth Dams (Case study: Mahmood-Abad Earth Dam

    Directory of Open Access Journals (Sweden)

    H. Rahimi

    2016-09-01

    Full Text Available Introduction: Cracking of earth dams is a one of the main threat causes of stability of embankment dams. In this research by modeling of the behavior of an embankment dam and employing conditions of the earthquake, the reasons of cracking were inspected using by modeling of earth dam behavior. Based on the literature, one of the main causes of dam failures is sliding and cracking of the dam structure during earthquake. Localized liquefaction of foundation soils was one of the causes of the observed post-earthquake distress within these dams. Material and Methods: In order to study the causes and the results of crack on earth dams, Mahmoodabad earthen dam with a height of 19 m, is located in Zanjan province, northwest of Iran, which suffered a longitudinal crack on the crest and slight sliding of the upstream slope due to 2001 Avaj earthquake was studied. This dam has faced earthquake two times with an interval of two years. During the first earthquake with the magnitude about 6.6 in Richter scale small longitudinal cracks had created on the crest. The developed cracks had been repaired by injecting the cement and then has been hidden by passing the time. After the second earthquake with the magnitude about 6.5 in Richter scale the hidden cracks had been appeared again and the slight movement of the upper slopes of dam reported. Based on the site investigation and documented information about dam, including maps and parameter data, the behavior of the dam has modeled by using Plaxis as a finite element model. In order to check the accuracy of the design of dam, the stability analysis has been conducted using by Xslope as a limit equilibrium model. The foundation conditions and the Geotechnical properties of the layer beneath the dam has been inspected by open excavation. Results and Discussion: Underground investigation about Geotechnical properties of dam foundation has showed that there is a thin sandy layer confined in alluvium material of the

  1. Hydrological Effects of Chashm Dam on the Downstream of Talar River Watershed

    Directory of Open Access Journals (Sweden)

    Mohammad Reza Khaleghi

    2017-02-01

    Full Text Available Introduction: In the last century, dams have constructed with the objective of water supplies for agriculture, drinking water and industry. However, the results from the performance review of dams show adverse effects on the downstream environment and the availability of water resources. The purpose of the Chashm dam construction on the TalarRiver's tributaries is the water supply for Semnan city. Materials and Methods: This study was conducted in TalarRiver watershed. TalarRiveroriginatesfrom AlborzMountains in Mazandaran province, in the southern Caspian Sea basin, in north of Iran and flows parallel with the Firouzkooh-Ghaemshahr road and it arrives to the Caspian beach area in the Malek Kala village. In order to supply the water requirements of Semnan city, the construction of Chashm dam on the TalarRiver's tributaries placed on the agenda of the Ministry of Energy. However, because of the uncontrolled exploitation of agricultural streams and invasion of privacy riverbed, the TalarRiver has acute and critical conditions from the point of hydrologic and environmental. To study the hydrological impacts of Chashm dam, Talar watershed was considered with an area of approximately 1057 square kilometers of the Pole Sefid gauging station using a rainfall-runoff model. Results and Discussion: Simulation of the study area hydrological behavior shows that the Chashm Dam average water discharge is near to 8.6 million m3. This figure will be significant changes during wet and droughtperiods. The minimum and maximum monthly discharge of the Chashm Dam watershed in August and February is equal to 0.31 and 0.55 m3/s respectively. The minimum and maximum monthly water demand in turn in October and August is equal to 0.015 and 0.4 m3/s respectively and this shows that the river discharge in June is lower than the downstream water demand. Based on confirmed studies of the Kamandab Consulting Engineers, drinking water requirement of Semnan province, water

  2. EVALUASI KEAMANAN DAM JATILUHUR BERBASIS INDEKS RESIKO

    Directory of Open Access Journals (Sweden)

    Avazbek Ishbaev

    2014-12-01

    Full Text Available The dams have very important roles to agricultural activities. Especially, West Java with 240,000 hectares of agricultural land, needs a good dam structure that can be used sustainably. Jatiluhur dam in Purwakarta, West Java is one of big dams in Indonesia which has important rules not only for Purwakarta but also for Jakarta, Karawang and Bekasi residents. A study and observation about safety and dam stability is needed to prevent any damage. The purpose of this research were to identify parameters that influenced dam safety and to evaluate dam reliability based on index tools. Analysis was done using risk index tools. The result showed that the condition of the dam of Jatiluhur is still satisfied with indicators, "Idam"-750. The total index risk was 127.22 and the safety factor was 83.04 out of 100. Therefore, Jatiluhur dam could be classified as safe and no need for particular treatments. Jatiluhur dam can be operated in normal condition or abnormal condition with periodic monitoring. Keywords: dam safety, evaluation, Jatiluhur Dam, risk index tools

  3. Dam safety operating guidelines

    International Nuclear Information System (INIS)

    Elsayed, E.; Leung, T.; Kirkham, A.; Lum, D.

    1990-01-01

    As part of Ontario Hydro's dam structure assessment program, the hydraulic design review of several river systems has revealed that many existing dam sites, under current operating procedures, would not have sufficient discharge capacity to pass the Inflow Design Flood (IDF) without compromising the integrity of the associated structures. Typical mitigative measures usually considered in dealing with these dam sites include structural alterations, emergency action plans and/or special operating procedures designed for extreme floods. A pilot study was carried out for the Madawaska River system in eastern Ontario, which has seven Ontario Hydro dam sites in series, to develop and evaluate the effectiveness of the Dam Safety Operating Guidelines (DSOG). The DSOG consist of two components: the flood routing schedules and the minimum discharge schedules, the former of which would apply in the case of severe spring flood conditions when the maximum observed snowpack water content and the forecast rainfall depth exceed threshold values. The flood routing schedules would identify to the operator the optimal timing and/or extent of utilizing the discharge facilities at each dam site to minimize the potential for dam failures cased by overtopping anywhere in the system. It was found that the DSOG reduced the number of structures overtopped during probable maximum flood from thirteen to four, while the number of structures that could fail would be reduced from seven to two. 8 refs., 4 figs., 3 tabs

  4. Flood effects provide evidence of an alternate stable state from dam management on the Upper Missouri River

    Science.gov (United States)

    Skalak, Katherine; Benthem, Adam J.; Hupp, Cliff R.; Schenk, Edward R.; Galloway, Joel M.; Nustad, Rochelle A.

    2017-01-01

    We examine how historic flooding in 2011 affected the geomorphic adjustments created by dam regulation along the approximately 120 km free flowing reach of the Upper Missouri River bounded upstream by the Garrison Dam (1953) and downstream by Lake Oahe Reservoir (1959) near the City of Bismarck, ND, USA. The largest flood since dam regulation occurred in 2011. Flood releases from the Garrison Dam began in May 2011 and lasted until October, peaking with a flow of more than 4200 m3 s−1. Channel cross-section data and aerial imagery before and after the flood were compared with historic rates of channel change to assess the relative impact of the flood on the river morphology. Results indicate that the 2011 flood maintained trends in island area with the loss of islands in the reach just below the dam and an increase in island area downstream. Channel capacity changes varied along the Garrison Segment as a result of the flood. The thalweg, which has been stable since the mid-1970s, did not migrate. And channel morphology, as defined by a newly developed shoaling metric, which quantifies the degree of channel braiding, indicates significant longitudinal variability in response to the flood. These results show that the 2011 flood exacerbates some geomorphic trends caused by the dam while reversing others. We conclude that the presence of dams has created an alternate geomorphic and related ecological stable state, which does not revert towards pre-dam conditions in response to the flood of record. This suggests that management of sediment transport dynamics as well as flow modification is necessary to restore the Garrison Segment of the Upper Missouri River towards pre-dam conditions and help create or maintain habitat for endangered species. Published 2016. This article is a U.S. Government work and is in the public domain in the USA.

  5. Dam risk reduction study for a number of large tailings dams in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Verma, N. [AMEC Earth and Environmental Ltd., Mississauga, ON (Canada); Small, A. [AMEC Earth and Environmental Ltd., Fredericton, NB (Canada); Martin, T. [AMEC Earth and Environmental, Burnaby, BC (Canada); Cacciotti, D. [AMEC Earth and Environmental Ltd., Sudbury, ON (Canada); Ross, T. [Vale Inco Ltd., Sudbury, ON (Canada)

    2009-07-01

    This paper discussed a risk reduction study conducted for 10 large tailings dams located at a central tailings facility in Ontario. Located near large industrial and urban developments, the tailings dams were built using an upstream method of construction that did not involve beach compaction or the provision of under-drainage. The study provided a historical background for the dam and presented results from investigations and instrumentation data. The methods used to develop the dam configurations were discussed, and remedial measures and risk assessment measures used on the dams were reviewed. The aim of the study was to address key sources of risk, which include the presence of high pore pressures and hydraulic gradients; the potential for liquefaction; slope instability; and the potential for overtopping. A borehole investigation was conducted and piezocone probes were used to obtain continuous data and determine soil and groundwater conditions. The study identified that the lower portion of the dam slopes were of concern. Erosion gullies could lead to larger scale failures, and elevated pore pressures could lead to the risk of seepage breakouts. It was concluded that remedial measures are now being conducted to ensure slope stability. 6 refs., 1 tab., 6 figs.

  6. The Effects of Dams on Downstream Channel Characteristics in Pennsylvania and Maryland: Assessing the Potential Consequences of Dam Removal

    Science.gov (United States)

    Skalak, K. J.; Pizzuto, J. E.; Jenkins, P.

    2003-12-01

    The potential downstream effects of dam removal were assessed on fifteen sites of varying dam size and characteristics in Pennsylvania and Maryland. The dams ranged in size from a 30 cm high fish weir to a water supply dam 57 m high. Stream order ranged from 1 to 4. The dams are located in watersheds with varying degrees of human disturbance and urbanization. The dams are also operated differently, with significant consequences for hydraulic residence time and downstream flow variability. Most streams were alluvial, but 6 of the reaches were clearly bedrock channels. We hypothesize that the channel upstream, which is unaffected by the dam, will provide an accurate model for the channel downstream of the dam long after dam removal. Therefore, reaches upstream and downstream of the dam were compared to determine the effects of the dam as well as the condition of the stream that will ultimately develop decades after dam removal. Surprisingly, the dams had no consistent influence on channel morphology. However, the percentage of sand is significantly lower downstream than upstream: the mean % sand downstream is 11.47%, while the mean % sand upstream is 21.39%. The coarser fractions of the bed, as represented by the 84th percentile grain diameter, are unaffected by the presence of the dam. These results imply that decades after dam removal, the percentage of sand on the bed will increase, but the coarse fraction of the bed will remain relatively unchanged.

  7. Trade Union Organisers in Trade Union Organising Strategies: building workplace unionism or reinforcing bureaucracy

    OpenAIRE

    Looker, Gerard

    2015-01-01

    This thesis considers the role of union full time officers in union organising strategies. Two decades of promoting union organising influenced by models developed by the AFL-CIO, has failed to arrest the decline of UK trade unions let alone produce evidence of renewal. Focusing mainly on one region in the UKs largest public sector trade union, Unison, the research provides for a detailed account of how organising strategies affect union work, presenting thick and deep data from full time off...

  8. Public safety around dams guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, T [Canadian Dam Association, Edmonton, AB (Canada)

    2010-07-01

    This presentation discussed Canadian and international initiatives for improving dam safety and described some of the drivers for the development of new Canadian Dam Association (CDA) public safety guidelines for dams. The CDA guidelines were divided into the following 3 principal sections: (1) managed system elements, (2) risk assessment and management, and (3) technical bulletins. Public and media responses to the drownings have called for improved safety guidelines. While the public remains unaware of the hazards of dams, public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. Guidelines are needed for dam owners in order to provide due diligence. Various organizations in Canada are preparing technical and public safety dam guidelines. CDA guidelines have also been prepared for signage, booms and buoys, and audible and visual alerts bulletins. Working groups are also discussing recommended practices for spill procedures, spillways and the role of professional engineers in ensuring public safety. Methods of assessing risk were also reviewed. Managed system elements for risk assessment and public interactions were also discussed, and stepped control measures were presented. tabs., figs.

  9. Odelouca Dam Construction: Numerical Analysis

    OpenAIRE

    Brito, A.; Maranha, J. R.; Caldeira, L.

    2012-01-01

    Odelouca dam is an embankment dam, with 76 m height, recently constructed in the south of Portugal. It is zoned with a core consisting of colluvial and residual schist soil and with soil-rockfill mixtures making up the shells (weathered schist with a significant fraction of coarse sized particles). This paper presents a numerical analysis of Odelouca Dam`s construction. The material con-stants of the soil model used are determined from a comprehensive testing programme carried out in the C...

  10. Effect of a dam on epilithic algal communities of a mountain stream: before-after dam construction comparison

    Directory of Open Access Journals (Sweden)

    Luciana Cibils Martina

    2013-02-01

    Full Text Available In this study we evaluated the effect of a dam on epilithic algal communities by analyzing community response after dam construction and by comparing community composition, structure and biomass upstream and downstream of the dam. Samples of epilithic algae and environmental data were collected at each site during high and low water periods before and after dam construction in Achiras Stream (Córdoba, Argentina. Ordinations showed modifications in algal assemblages after dam construction and downstream of the dam. Ordinations also suggested a loss of seasonality at the downstream site since the assemblages were similar between hydrological periods after dam construction. Indicator species, obtained by the Indicator Value method, showed that, after dam construction, there could have been an increase in nutrient concentration and a release of plankton from the impoundment. Abundance, richness and diversity were altered after dam construction as assessed by ANOVAs derived from a modified BACI Design. Proportion of early-successional species was higher at the upstream site while late-successional species were dominant at the downstream site, as predicted. Lower fluctuations in discharge downstream of the dam may have helped succession advance, whereas at the upstream site, mainly during the high water period, floods could have caused sloughing of life forms from the outer layers of the biofilm, resetting the algal community to early successional stages. It may be concluded that the dam affected algal community and favored succession advance mainly by reducing current velocity and flow fluctuations.

  11. 78 FR 77397 - Flood Control Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas

    Science.gov (United States)

    2013-12-23

    ... Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas AGENCY: U.S. Army Corps... Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas. In 1997, the Lower Colorado River... regulations to reflect changes in ownership and responsibilities of flood control management of Marshall Ford...

  12. 7 CFR 1724.55 - Dam safety.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Dam safety. 1724.55 Section 1724.55 Agriculture... § 1724.55 Dam safety. (a) The provisions of this section apply only to RUS financed electric system... for Dam Safety,”(Guidelines), as applicable. A dam, as more fully defined in the Guidelines, is...

  13. New guidelines for dam safety classification

    International Nuclear Information System (INIS)

    Dascal, O.

    1999-01-01

    Elements are outlined of recommended new guidelines for safety classification of dams. Arguments are provided for the view that dam classification systems should require more than one system as follows: (a) classification for selection of design criteria, operation procedures and emergency measures plans, based on potential consequences of a dam failure - the hazard classification of water retaining structures; (b) classification for establishment of surveillance activities and for safety evaluation of dams, based on the probability and consequences of failure - the risk classification of water retaining structures; and (c) classification for establishment of water management plans, for safety evaluation of the entire project, for preparation of emergency measures plans, for definition of the frequency and extent of maintenance operations, and for evaluation of changes and modifications required - the hazard classification of the project. The hazard classification of the dam considers, as consequence, mainly the loss of lives or persons in jeopardy and the property damages to third parties. Difficulties in determining the risk classification of the dam lie in the fact that no tool exists to evaluate the probability of the dam's failure. To overcome this, the probability of failure can be substituted for by a set of dam characteristics that express the failure potential of the dam and its foundation. The hazard classification of the entire project is based on the probable consequences of dam failure influencing: loss of life, persons in jeopardy, property and environmental damage. The classification scheme is illustrated for dam threatening events such as earthquakes and floods. 17 refs., 5 tabs

  14. Environmental effects of the Big Rapids dam remnant removal, Big Rapids, Michigan, 2000-02

    Science.gov (United States)

    Healy, Denis F.; Rheaume, Stephen J.; Simpson, J. Alan

    2003-01-01

    The U.S. Geological Survey (USGS), in cooperation with the city of Big Rapids, investigated the environmental effects of removal of a dam-foundation remnant and downstream cofferdam from the Muskegon River in Big Rapids, Mich. The USGS applied a multidiscipline approach, which determined the water quality, sediment character, and stream habitat before and after dam removal. Continuous water-quality data and discrete water-quality samples were collected, the movement of suspended and bed sediment were measured, changes in stream habitat were assessed, and streambed elevations were surveyed. Analyses of water upstream and downstream from the dam showed that the dam-foundation remnant did not affect water quality. Dissolved-oxygen concentrations downstream from the dam remnant were depressed for a short period (days) during the beginning of the dam removal, in part because of that removal effort. Sediment transport from July 2000 through March 2002 was 13,800 cubic yards more at the downstream site than the upstream site. This increase in sediment represents the remobilized sediment upstream from the dam, bank erosion when the impoundment was lowered, and contributions from small tributaries between the sites. Five habitat reaches were monitored before and after dam-remnant removal. The reaches consisted of a reference reach (A), upstream from the effects of the impoundment; the impoundment (B); and three sites below the impoundment where habitat changes were expected (C, D, and E, in downstream order). Stream-habitat assessment reaches varied in their responses to the dam-remnant removal. Reference reach A was not affected. In impoundment reach B, Great Lakes and Environmental Assessment Section (GLEAS) Procedure 51 ratings went from fair to excellent. For the three downstream reaches, reach C underwent slight habitat degradation, but ratings remained good; reach D underwent slight habitat degradation with ratings changing from excellent to good; and, in an area

  15. War damages and reconstruction of Peruca dam

    International Nuclear Information System (INIS)

    Nonveiller, E.; Sever, Z.

    1999-01-01

    The paper describes the heavy damages caused by blasting in the Peruca rockfill dam in Croatia in January 1993. Complete collapse of the dam by overtopping was prevented through quick action of the dam owner by dumping clayey gravel on the lowest sections of the dam crest and opening the bottom outlet of the reservoir, thus efficiently lowering the water level. After the damages were sufficiently established and alternatives for restoration of the dam were evaluated, it was decided to construct a diaphragm wall through the damaged core in the central dam part as the impermeable dam element and to rebuild the central clay core at the dam abutments. Reconstruction works are described

  16. 33 CFR 208.19 - Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Marshall Ford Dam and Reservoir... Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex. The Secretary of the Interior, through his agent, the Lower Colorado River Authority (LCRA) shall operate the Marshall Ford Dam...

  17. Excavation of the Surikamigawa dam diversion tunnel. Surikamigawa dam karihaisui tunnel kantsu

    Energy Technology Data Exchange (ETDEWEB)

    Ikeda, T.; Konno, T. (Ministry of Construction, Tokyo (Japan))

    1994-04-01

    A bypass tunnel construction has been completed at the Surikamigawa dam (Japan). This paper describes the summary of the construction. The full-swing dam construction work is scheduled to begin in 1995. The soils distributed near the dam site consist of lapillus tuff containing andesite-based light stones and tuff-based conglomerates containing large gravels. Excavation of the dam diversion tunnel has used a blasting method, and the tunnel construction has adopted an automatic tunnel cross section marking system and a non-electric explosion method. This marking system is a system to irradiate a laser beam onto the facing to depict excavation lines that realizes labor saving and high-accuracy excavation. The error at the tunnel completion was found 20 mm. The non-electric explosion method ignites a coated explosive layer with an impact wave, which is electrostatically safe, and reduces blasting vibration. Electric detonators have also been used because of using ANFO explosives. The result obtained from measurements of inner space displacement necessary for the blasting process has indicated that the area near the dam site consists of stable mountains. 6 figs., 4 tabs.

  18. Three Sisters Dam modifications and performance

    Energy Technology Data Exchange (ETDEWEB)

    Courage, L.J.R. [Monenco AGRA Inc., Calgary, AB (Canada)

    1995-12-31

    Recent modifications and maintenance carried out at the Three Sisters Dam, in the Alberta Rockies south of the town of Canmore, were described. A detailed account was given of the dam`s geological setting, its abnormally high leakage through the foundation and its sinkhole activity. Results of studies aimed at finding the cause of leakage and sinkhole occurrences were reviewed. Modifications made to the dam since 1951 were detailed, as were modifications to handle probable maximum flood levels. Three approaches for estimating failure probabilities after identification of failure modes were described. The overall conclusion was that based on constant leakage, no settlement in the dam, penstocks, or the powerhouse since construction, the Three Sisters Dam was stable. 1 ref.

  19. Getting to the CORE of the Chicago Teachers’ Union Transformation

    Directory of Open Access Journals (Sweden)

    Peter Brogan

    2014-05-01

    Full Text Available This article draws on a comparative study of urban change and rank-and-file teacher rebellion in New York City and Chicago, to explore the contemporary dynamics of what Jamie Peck (2013 calls “austerity urbanism” and its relationship to a rebirth of a social justice, grassroots teacher unionism in US urban centres. Tracing the trajectories of one group of rank-and-file teacher dissidents in Chicago, it argues that municipal unions are uniquely situated to lead the fight against austerity urbanism and the crisis tendencies of contemporary capitalism. To do this, however, trade unions will need to be reinvented and a different form of working class politic forged, grounded both in and outside of the trade union movement. Only then may we see organized labour in North America contribute to a movement for radical and systemic change, which is key to building a more socially just urbanism and society more broadly. The case of the Chicago teachers is highly instructive for activists, both inside and outside of the North American labour movement.

  20. 75 FR 56160 - BNSF Railway Company and Union Pacific Railroad Company-Joint Relocation Project Exemption-in...

    Science.gov (United States)

    2010-09-15

    ... existing wye tracks a short distance to the south. The underlying real estate will be conveyed to the City... easterly and then southerly direction to BNSF's Hobson Yard in the City. UP has overhead trackage rights....--Trackage Rights Exemption--The Burlington N. & Santa Fe Ry., FD 33403 (STB served June 3, 1997); Union Pac...

  1. MODELING AND ANALYSIS OF ALGAL BLOOMS IN ARAS DAM BY ARTIFICIAL NEURAL NETWORK

    Directory of Open Access Journals (Sweden)

    JAHANGIRI-RAD MAHSA

    2015-03-01

    Full Text Available Man made practices have contributed to large-scale algal blooms that have caused serious ecological, aesthetic, water purification and water distribution problems. Aras Dam, which provides Arasful city with drinking water, has chronic algal blooms since 1990. This study addresses the use of artificial neural network (ANN model to anticipate the chlorophyll-a concentration in water of dam reservoir. Operation tests carried out by collecting water samples from 5 stations and examined for physical quality parameters namely: water temperature, total suspended solids (TSS, biochemical oxygen demands (BOD, ortophosphate, total phosphorous and nitrate concentrations using standard methods. Chlorophyll-a was also checked separately in order to investigate the accuracy of the predicted results by ANN. The results showed that a network was highly accurate in predicting the Chl-a concentration. A good agreement between actual data and the ANN outputs for training was observed, indicating the validation of testing data sets. The initial results of the research indicate that the dam is enriched with nutrients (phosphorus and nitrogen. The Chl-a concentration that were predicted by the model were beyond the standard levels; indicating the possibility of eutrophication especially during fall season.

  2. Dams and Levees: Safety Risks

    Science.gov (United States)

    Carter, N. T.

    2017-12-01

    The nation's flood risk is increasing. The condition of U.S. dams and levees contributes to that risk. Dams and levee owners are responsible for the safety, maintenance, and rehabilitation of their facilities. Dams-Of the more than 90,000 dams in the United States, about 4% are federally owned and operated; 96% are owned by state and local governments, public utilities, or private companies. States regulate dams that are not federally owned. The number of high-hazard dams (i.e., dams whose failure would likely result in the loss of human life) has increased in the past decade. Roughly 1,780 state-regulated, high-hazard facilities with structural ratings of poor or unsatisfactory need rehabilitation. Levees-There are approximately 100,000 miles of levees in the nation; most levees are owned and maintained by municipalities and agricultural districts. Few states have levee safety programs. The U.S. Army Corps of Engineers (Corps) inspects 15,000 miles of levees, including levees that it owns and local levees participating in a federal program to assist with certain post-flood repairs. Information is limited on how regularly other levees are inspected. The consequence of a breach or failure is another aspect of risk. State and local governments have significant authority over land use and development, which can shape the social and economic impacts of a breach or failure; they also lead on emergency planning and related outreach. To date, federal dam and levee safety efforts have consisted primarily of (1) support for state dam safety standards and programs, (2) investments at federally owned dams and levees, and (3) since 2007, creation of a national levee database and enhanced efforts and procedures for Corps levee inspections and assessments. In Public Law 113-121, enacted in 2014, Congress (1) directed the Corps to develop voluntary guidelines for levee safety and an associated hazard potential classification system for levees, and (2) authorized support for the

  3. Health impacts of large dams

    International Nuclear Information System (INIS)

    Lerer, L.B.

    1999-01-01

    Large dams have been criticized because of their negative environmental and social impacts. Public health interest largely has focused on vector-borne diseases, such as schistosomiasis, associated with reservoirs and irrigation projects. Large dams also influence health through changes in water and food security, increases in communicable diseases, and the social disruption caused by construction and involuntary resettlement. Communities living in close proximity to large dams often do not benefit from water transfer and electricity generation revenues. A comprehensive health component is required in environmental and social impact assessments for large dam projects

  4. Deformation performance of Waba Dam

    Energy Technology Data Exchange (ETDEWEB)

    Salloum, T.; Bhardwaj, V.; Hassan, P. [Ontario Power Generation, Niagara-on-the-Lake, ON (Canada); Cragg, C. [Cragg Consulting Services, Toronto, ON (Canada)

    2009-07-01

    This paper described the performance of the Waba Dam which is being monitored as part of Ontario Power Generation's Dam Safety Program. It described the deformations that have been observed in this 3600 ft long earthfill dam which lies on marine clay in eastern Ontario. An extensive instrumentation program, including foundation settlement gauges, surface monuments, slope inclinometers, load cells and piezometers has been in effect since the construction of the dam in 1975. Significant settlement has occurred at Waba Dam since its construction. Wide berms were provided upstream and downstream beyond the slopes of the main fill to ensure stability of the dyke on the soft clay foundation and the crest elevations were designed to allow for the expected settlement in the foundation which would be overstressed by the dam loading. Based on current settlements, future settlements are predicted based on Asaoka's method. Inclinometer measurements have shown a foundation lateral spreading of 12 in. The lateral versus vertical deformations were found to be comparable to well behaving embankments reported in the literature. These analyses indicate that Waba Dam is performing well and should continue to perform well into the future. 8 refs., 1 tab., 14 figs.

  5. DAM-LAKEFRONT PLAZA: Revitalization of an Agriculture Reservoir Dam in Kashar-Tirana/Albania

    Directory of Open Access Journals (Sweden)

    Valbona Koçi

    2014-12-01

    Full Text Available The Dam-Lakefront Plaza in Kashar-Tirana/Albania is a research project that proposes not only the re-consideration and reinforcement of the artificial Reservoirs Dams built during Socialism in Albania, but envisions the maintenance of dams and revitalization of the lakeside area promoting the public-private collaboration. In addition, it envisions the generation of qualitative and lively public spaces in sub-urban areas as well. Admitting the artificial lakes as specific nodes of man-made infrastructure in the landscape, and consequently the dams (together with the drainage channels as important hydrotechnic elements of the flood protection infrastructure, this research intends to elaborate on one type of landscape infrastructure - the vertical screens, offering a mediation between the natural and built landscape.

  6. Water quantity and quality optimization modeling of dams operation based on SWAT in Wenyu River Catchment, China.

    Science.gov (United States)

    Zhang, Yongyong; Xia, Jun; Chen, Junfeng; Zhang, Minghua

    2011-02-01

    Water quantity and quality joint operation is a new mode in the present dams' operation research. It has become a hot topic in governmental efforts toward integrated basin improvement. This paper coupled a water quantity and quality joint operation model (QCmode) and genetic algorithm with Soil and Water Assessment Tool (SWAT). Together, these tools were used to explore a reasonable operation of dams and floodgates at the basin scale. Wenyu River Catchment, a key area in Beijing, was selected as the case study. Results showed that the coupled water quantity and quality model of Wenyu River Catchment more realistically simulates the process of water quantity and quality control by dams and floodgates. This integrated model provides the foundation for research of water quantity and quality optimization on dam operation in Wenyu River Catchment. The results of this modeling also suggest that current water quality of Wenyu River will improve following the implementation of the optimized operation of the main dams and floodgates. By pollution control and water quantity and quality joint operation of dams and floodgates, water quality of Wenyu river will change significantly, and the available water resources will increase by 134%, 32%, 17%, and 82% at the downstream sites of Sha River Reservoir, Lutong Floodgate, Xinpu Floodgate, and Weigou Floodgate, respectively. The water quantity and quality joint operation of dams will play an active role in improving water quality and water use efficiency in Wenyu River Basin. The research will provide the technical support for water pollution control and ecological restoration in Wenyu River Catchment and could be applied to other basins with large number of dams. Its application to the Wenyu River Catchment has a great significance for the sustainable economic development of Beijing City.

  7. Fragility Analysis of Concrete Gravity Dams

    Science.gov (United States)

    Tekie, Paulos B.; Ellingwood, Bruce R.

    2002-09-01

    Concrete gravity dams are an important part ofthe nation's infrastructure. Many dams have been in service for over 50 years, during which time important advances in the methodologies for evaluation of natural phenomena hazards have caused the design-basis events to be revised upwards, in some cases significantly. Many existing dams fail to meet these revised safety criteria and structural rehabilitation to meet newly revised criteria may be costly and difficult. A probabilistic safety analysis (PSA) provides a rational safety assessment and decision-making tool managing the various sources of uncertainty that may impact dam performance. Fragility analysis, which depicts fl%e uncertainty in the safety margin above specified hazard levels, is a fundamental tool in a PSA. This study presents a methodology for developing fragilities of concrete gravity dams to assess their performance against hydrologic and seismic hazards. Models of varying degree of complexity and sophistication were considered and compared. The methodology is illustrated using the Bluestone Dam on the New River in West Virginia, which was designed in the late 1930's. The hydrologic fragilities showed that the Eluestone Dam is unlikely to become unstable at the revised probable maximum flood (PMF), but it is likely that there will be significant cracking at the heel ofthe dam. On the other hand, the seismic fragility analysis indicated that sliding is likely, if the dam were to be subjected to a maximum credible earthquake (MCE). Moreover, there will likely be tensile cracking at the neck of the dam at this level of seismic excitation. Probabilities of relatively severe limit states appear to be only marginally affected by extremely rare events (e.g. the PMF and MCE). Moreover, the risks posed by the extreme floods and earthquakes were not balanced for the Bluestone Dam, with seismic hazard posing a relatively higher risk.

  8. The role of dams in development

    International Nuclear Information System (INIS)

    Cakmak, C.

    2001-01-01

    Although the amounts of water resources are enough for the entire world, the distribution of them in time and space shows uneven pattern. The water need is increasing with heavy industrial and agricultural requirements, while available water in the world remains as a fixed source. Economic growth, socio-cultural, and environmental developments are being realized following these changes. In order to achieve sustainable management of water resources, these changes have to be taken into consideration in water-related development projects. Demand for water is steadily increasing through out the world, even though the fresh water resources are limited and unevenly distributed, during the past three centuries, the amount of water withdrawn from fresh water resources has increased by a factor of 35, whereas world population by a factor 8. The engineering of dams, which provides regular water from reservoirs of dams to be used in case of demand pattern, is a vital part of the civilization. Dams have played a key rote in the development since the third millennium B C when the first great civilizations evolved on major rivers, such as Tigris-Euphrates, the Nile and the Indus. From these early times dams were built for flood control, water supply, irrigation and navigation. Dams also had been built to produce motive power and electricity since the industrial revolution. Development priorities changed, experience accumulated with the construction and operation of dams. Although the importance of water is well known in the human life and civilization around the world, still various groups argue that expected economic benefits are not being produced and that major environmental, economic and social costs are not being taken into account. By the end of 20th century, there were 45000 large dams in over 150 countries. According to the same classification there are 625 large dams in Turkey. All over the world, 50 % of the large dams were built mainly for irrigation. It is estimated

  9. Matahina Dam : lessons learned from an earthquake-related internal erosion incident at the Matahina Dam, New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Gillon, M. [Damwatch Services Ltd., Wellington (New Zealand)

    2009-07-01

    This case history discussed internal erosion damage and crest subsidence caused by an earthquake at the Matahina Dam in New Zealand. The study showed that cracking and internal erosion was initiated during the 1967 reservoir filling operation. Located in an area of active volcanism and faulting, the dam is located on a river with extensive erosion through an ignimbrite flow. The dam's core is founded on compact Tertiary age sediments overlain by sand and gravel deposits beneath the shoulders of the dam. The earthquake caused a rupture along an unidentified fault trace 12 km from the dam. The horizontal base acceleration recorded at the dam was 3.25 m/s. Transverse cracking was observed at each abutment, and deformations were observed in the rockfill. An investigation program was conducted to determine the dam's integrity. Piezometer measurements showed widespread fluctuations. It was concluded that the lack of an effective filter was a significant design omission. 12 refs., 12 figs.

  10. Trade Union Channels for Influencing European Union Policies

    Directory of Open Access Journals (Sweden)

    Bengt Larsson

    2015-10-01

    Full Text Available This paper analyzes what channels trade unions in Europe use when trying to influence European Union (EU policies. It compares and contrasts trade unions in different industrial relations regimes with regard to the degree to which they cooperate with different actors to influence EU policies, while also touching on the importance of sector differences and organizational resources. The study is based on survey data collected in 2010–2011 from unions affiliated with the European Trade Union Confederation and from below peak unions in 14 European countries. Results of the survey show that the ‘national route’ is generally the most important for trade unions in influencing EU policies in the sense that this channel is, on average, used to the highest degree. In addition, the survey delineates some important differences between trade unions in different industrial relations regimes with regard to the balance between the national route and different access points in the ‘Brussels route’.

  11. Technical bulletin : structural considerations for dam safety

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This technical bulletin discussed issues related to the safety assessment of concrete water-retaining structures and timber dams. Structures reviewed in the paper included gravity dams; buttress dams; arch dams; spillway structures; intake structures; power plants; roller compacted concrete dams; and timber dams. A variety of issues related to the loss of cohesive bond and discontinuities in bedrock foundations were reviewed with reference to issues related to compressive strength, tensile strength, and shear strength. Static failure modes and failure mechanisms related to dam failures were also described. Visual indicators for potential failures include abutment and foundation movement, seepage, and structure movements. Loading combinations were discussed, and performance indicators for gravity dams were provided. Methods of analysis for considering load characteristics, structure types and geological conditions were also discussed. Modelling techniques for finite element analysis were also included. 16 refs., 3 tabs., 5 figs.

  12. Assessing Risks of Mine Tailing Dam Failures

    Science.gov (United States)

    Concha Larrauri, P.; Lall, U.

    2017-12-01

    The consequences of tailings dam failures can be catastrophic for communities and ecosystems in the vicinity of the dams. The failure of the Fundão tailings dam at the Samarco mine in 2015 killed 19 people with severe consequences for the environment. The financial and legal consequences of a tailings dam failure can also be significant for the mining companies. For the Fundão tailings dam, the company had to pay 6 billion dollars in fines and twenty-one executives were charged with qualified murder. There are tenths of thousands of active, inactive, and abandoned tailings dams in the world and there is a need to better understand the hazards posed by these structures to downstream populations and ecosystems. A challenge to assess the risks of tailings dams in a large scale is that many of them are not registered in publicly available databases and there is little information about their current physical state. Additionally, hazard classifications of tailings dams - common in many countries- tend to be subjective, include vague parameter definitions, and are not always updated over time. Here we present a simple methodology to assess and rank the exposure to tailings dams using ArcGIS that removes subjective interpretations. The method uses basic information such as current dam height, storage volume, topography, population, land use, and hydrological data. A hazard rating risk was developed to compare the potential extent of the damage across dams. This assessment provides a general overview of what in the vicinity of the tailings dams could be affected in case of a failure and a way to rank tailings dams that is directly linked to the exposure at any given time. One hundred tailings dams in Minas Gerais, Brazil were used for the test case. This ranking approach could inform the risk management strategy of the tailings dams within a company, and when disclosed, it could enable shareholders and the communities to make decisions on the risks they are taking.

  13. The socio-economics dynamics of Dam on Rural Communities: A case study of Oyan Dam, Nigeria

    Science.gov (United States)

    Ayeni, Amidu; Ojifo, Lawrence

    2018-06-01

    Dams construction and operations have many benefits, nevertheless, they have also led to lots of negative social, health and human impacts. It is based on this that this study assesses the potential and socio-economics dynamics of Oyan dam between 1980 and 2016. The data used for this study include water level and discharge records of the dam between 2007 and 2016, Landsat imageries of 1984 and 2016 and socio-economic datasets for the period. Analysis of the dam potentials (water supply, agriculture and hydropower) and socio-economic impacts of the dam were carried out using basic statistical tools, land use change anaysis and field survey using questionnaire, structured interview with major stakeholders and personal observation. The results revealed that the water level and storage of the Oyan dam had a relative reduction of about 2 % as well as non-stationarity pattern of water abstraction and production for the period. The landuse classes show all classes decreased in extent except the cultivated landuse that acrued an increased of 19.9 % between 1984 and 2016. Furthermore, commercial water supply varied significantly between 2010 and 2016 while irrigation scheme is grossly under-utilized from the inception in 1983 to 2016. Finally, the result of socio-economic impacts revealed that majority of the selected communities' members are actually not benefiting from the dam and their livelihoods are not from the dam.

  14. Sediment Transport Over Run-of-River Dams

    Science.gov (United States)

    O'Brien, M.; Magilligan, F. J.; Renshaw, C. E.

    2016-12-01

    Dams have numerous documented effects that can degrade river habitat downstream. One significant effect of large dams is their ability to trap sediment delivered from upstream. This trapping can alter sediment transport and grain size downstream - effects that often motivate dam removal decisions. However, recent indirect observations and modeling studies indicate that small, run-of-river (ROR) dams, which do not impede discharge, may actually leak sediment downstream. However, there are no direct measurements of sediment flux over ROR dams. This study investigates flow and sediment transport over four to six different New England ROR dams over a summer-fall field season. Sediment flux was measured using turbidity meters and tracer (RFID) cobbles. Sediment transport was also monitored through an undammed control site and through a river where two ROR dams were recently removed. These data were used to predict the conditions that contribute to sediment transport and trapping. Year 1 data show that tracer rocks of up to 61 mm were transported over a 3 m ROR dam in peak flows of 84% of bankfull stage. These tracer rocks were transported over and 10 m beyond the dam and continue to move downstream. During the same event, comparable suspended sediment fluxes of up to 81 g/s were recorded both upstream and downstream of the dam at near-synchronous timestamps. These results demonstrate the potential for sediment transport through dammed rivers, even in discharge events that do not exceed bankfull. This research elucidates the effects of ROR dams and the controls on sediment transport and trapping, contributions that may aid in dam management decisions.

  15. Hydraulics of embankment-dam breaching

    Science.gov (United States)

    Walder, J. S.; Iverson, R. M.; Logan, M.; Godt, J. W.; Solovitz, S.

    2012-12-01

    Constructed or natural earthen dams can pose hazards to downstream communities. Experiments to date on earthen-dam breaching have focused on dam geometries relevant to engineering practice. We have begun experiments with dam geometries more like those of natural dams. Water was impounded behind dams constructed at the downstream end of the USGS debris-flow flume. Dams were made of compacted, well-sorted, moist beach sand (D50=0.21 mm), 3.5 m from toe to toe, but varying in height from 0.5 to 1 m; the lower the dam, the smaller the reservoir volume and the broader the initially flat crest. Breaching was started by cutting a slot 30-40 mm wide and deep in the dam crest after filling the reservoir. Water level and pore pressure within the dam were monitored. Experiments were also recorded by an array of still- and video cameras above the flume and a submerged video camera pointed at the upstream dam face. Photogrammetric software was used to create DEMs from stereo pairs, and particle-image velocimetry was used to compute the surface-velocity field from the motion of tracers scattered on the water surface. As noted by others, breaching involves formation and migration of a knickpoint (or several). Once the knickpoint reaches the upstream dam face, it takes on an arcuate form whose continued migration we determined by measuring the onset of motion of colored markers on the dam face. The arcuate feature, which can be considered the head of the "breach channel", is nearly coincident with the transition from subcritical to supercritical flow; that is, it acts as a weir that hydraulically controls reservoir emptying. Photogenic slope failures farther downstream, although the morphologically dominant process at work, play no role at all in hydraulic control aside from rare instances in which they extend upstream so far as to perturb the weir, where the flow cross section is nearly self-similar through time. The domain downstream of the critical-flow section does influence

  16. Dam that social networking: connecting South Africa's major dams to social media

    CSIR Research Space (South Africa)

    Butgereit, L

    2011-10-01

    Full Text Available where four major South African dams are connected to Twitter and Facebook (and other social media such as MXit and Google Chat) in a mechanism which would be easy to replicate for additional dams or rivers. Data is supplied by the South African...

  17. The (recreation of postmodern Spanish cities. The role of immigrants

    Directory of Open Access Journals (Sweden)

    José Somoza Medina

    2004-01-01

    Full Text Available The consequences of full incorporation into the European Union and the effects of globalisationcontributed to the modification of social structures in Spain. The accelerated rise inimmigration has been decisive in creating the post-modern Spanish city. The cities of thetwenty-first century are more complex, but also more cosmopolitan, multi-cultural, rich anddynamic.

  18. TYPOLOGY OF LARGE DAMS. A REVIEW

    Directory of Open Access Journals (Sweden)

    Gheorghe ROMANESCU

    2015-06-01

    Full Text Available The dams represent hydrotechnical constructions meant to ensure a judicious use of water resources. The international literature is extremely rich in data regarding the large dams on Earth. In this context, a hierarchy of the main dams is attempted and the role they play in the economic development of the regions they were built in is underlined. The largest dams are built on the big rivers in Asia, North America, South America and Africa. The reservoirs have multiple roles: electricity production, drinking or industrial water supply, irrigations, recreation, etc. High costs and land fragility do not allow the construction of dams in the places most affected by drought or flood. This is why they are usually built in mountainous areas, at great distance from the populated centres. On the Romanian territory, there are 246 large dams, built in the hydrographical basins of Siret, Olt, Arges, Somes, etc. The largest rivers on Earth, by discharge, (Amazon and Zair do not also include the largest dams because the landform and the type of flow have not allowed such constructions.

  19. Construction of anhydrite dams

    Energy Technology Data Exchange (ETDEWEB)

    Bortoluzzi, L; Francois, G

    1977-05-01

    To construct a ventilation dam, the road is closed with a fibreglass sheet onto which 3 or 4 cm of anhydrite paste is sprayed. The equipment necessary is described, and the cost is compared with that of an aggregate dam.

  20. Dams, Hydrology and Risk in Future River Management

    Science.gov (United States)

    Wegner, D. L.

    2017-12-01

    Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.

  1. Mitigating Dam Impacts Using Environmental Flow Releases

    Science.gov (United States)

    Richter, B. D.

    2017-12-01

    One of the most ecologically disruptive impacts of dams is their alteration of natural river flow variability. Opportunities exist for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. This presentation will highlight a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the suggested strategies for dam re-operation are predicated on changes in the end-use of the water, such as reductions in urban or agricultural water use during droughts, a systemic perspective of entire water management systems will be required to attain the fullest possible

  2. Simulation of Breach Outflow for Earthfill Dam

    International Nuclear Information System (INIS)

    Razad, Azwin Zailti Abdul; Muda, Rahsidi Sabri; Sidek, Lariyah Mohd; Azia, Intan Shafilah Abdul; Mansor, Faezah Hanum; Yalit, Ruzaimei

    2013-01-01

    Dams have been built for many reasons such as irrigation, hydropower, flood mitigation, and water supply to support development for the benefit of human. However, the huge amount of water stored behind the dam can seriously pose adverse impacts to the downstream community should it be released due to unwanted dam break event. To minimise the potential loss of lives and property damages, a workable Emergency Response Plan is required to be developed. As part of a responsible dam owner and operator, TNB initiated a study on dam breach modelling for Cameron Highlands Hydroelectric Scheme to simulate the potential dam breach for Jor Dam. Prediction of dam breach parameters using the empirical equations of Froehlich and Macdonal-Langridge-Monopolis formed the basis of the modelling, coupled with MIKE 11 software to obtain the breach outflow due to Probable Maximum Flood (PMF). This paper will therefore discuss the model setup, simulation procedure and comparison of the prediction with existing equations.

  3. Restoring Environmental Flows by Modifying Dam Operations

    Directory of Open Access Journals (Sweden)

    Brian D. Richter

    2007-06-01

    Full Text Available The construction of new dams has become one of the most controversial issues in global efforts to alleviate poverty, improve human health, and strengthen regional economies. Unfortunately, this controversy has overshadowed the tremendous opportunity that exists for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. This paper describes an assessment framework that can be used to evaluate the benefits that might be restored through dam re-operation. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. The paper highlights a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the

  4. Sustainability of dams-an evaluation approach

    Science.gov (United States)

    Petersson, E.

    2003-04-01

    Situated in the stream bed of a river, dams and reservoirs interrupt the natural hydrological cycle. They are very sensitive to all kinds of changes in the catchment, among others global impacts on land use, climate, settlement structures or living standards. Vice versa dams strongly affect the spatially distributed, complex system of ecology, economy and society in the catchment both up- and downstream of the reservoir. The occurrence of negative impacts due to large dams led to serious conflicts about future dams. Nevertheless, water shortages due to climatic conditions and their changes, that are faced by enormous water and energy demands due to rising living standards of a growing world population, seem to require further dam construction, even if both supply and demand management are optimised. Although environmental impact assessments are compulsory for dams financed by any of the international funding agencies, it has to be assumed that the projects lack sustainability. Starting from an inventory of today's environmental impact assessments as an integral part of a feasibility study the presentation will identify their inadequacies with regard to the sustainability of dams. To improve the sustainability of future dams and avoid the mistakes of the past, the planning procedures for dams have to be adapted. The highly complex and dynamical system of interrelated physical and non-physical processes, that involves many different groups of stakeholders, constitutes the need for a model-oriented decision support system. In line with the report of the World Commission of Dams an integrated analysis and structure of the complex interrelations between dams, ecology, economy and society will be presented. Thus the system, that a respective tool will be based on, is analysed. Furthermore an outlook will be given on the needs of the potential users of a DSS and how it has to be embedded in the overall planning process. The limits of computer-based decision-support in the

  5. Brazil's Amazonian dams: Ecological and socioeconomic impacts

    Science.gov (United States)

    Fearnside, P. M.

    2016-12-01

    Brazil's 2015-2024 Energy Expansion Plan calls for 11 hydroelectric dams with installed capacity ≥ 30 MW in the country's Amazon region. Dozens of other large dams are planned beyond this time horizon, and dams with environmental and socioeconomic impacts. Loss of forest to flooding is one, the Balbina and Tucuruí Dams being examples (each 3000 km2). If the Babaquara/Altamira Dam is built it will flood as much forest as both of these combined. Some planned dams imply loss of forest in protected areas, for example on the Tapajós River. Aquatic and riparian ecosystems are lost, including unique biodiversity. Endemic fish species in rapids on the Xingu and Tapajós Rivers are examples. Fish migrations are blocked, such as the commercially important "giant catfish" of the Madeira River. Dams emit greenhouse gases, including CO2 from the trees killed and CH4 from decay under anoxic conditions at the bottom of reservoirs. Emissions can exceed those from fossil-fuel generation, particularly over the 20-year period during which global emissions must be greatly reduced to meet 1.5-2°C limit agreed in Paris. Carbon credit for dams under the Climate Convention causes further net emission because the dams are not truly "additional." Anoxic environments in stratified reservoirs cause methylation of mercury present in Amazonian soils, which concentrates in fish, posing a health risk to human consumers. Population displacement is a major impact; for example, the Marabá Dam would displace 40,000 people, mostly traditional riverside dwellers (ribeirinhos). Various dams impact indigenous peoples, such as the Xingu River dams (beginning with Belo Monte) and the São Luiz do Tapajós and Chacorão Dams on the Tapajós River. Brazil has many energy options other than dams. Much energy use has little benefit for the country, such as exporting aluminum. Electric showerheads use 5% of the country's power. Losses in transmission lines (20%) are far above global averages and can be

  6. Behavior and dam passage of juvenile Chinook salmon at Cougar Reservoir and Dam, Oregon, March 2011 - February 2012

    Science.gov (United States)

    Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Haner, Philip V.; Sprando, Jamie M.; Smith, Collin D.; Evans, Scott D.; Hatton, Tyson W.

    2013-01-01

    The movements and dam passage of juvenile Chinook salmon implanted with acoustic transmitters and passive integrated transponder tags were studied at Cougar Reservoir and Dam, near Springfield, Oregon. The purpose of the study was to provide information to aid with decisions about potential alternatives for improving downstream passage conditions for juvenile salmonids in this flood-control reservoir. In 2011, a total of 411 hatchery fish and 26 wild fish were tagged and released during a 3-month period in the spring, and another 356 hatchery fish and 117 wild fish were released during a 3-month period in the fall. A series of 16 autonomous hydrophones throughout the reservoir and 12 hydrophones in a collective system near the dam outlet were used to determine general movements and dam passage of the fish over the life of the acoustic transmitter, which was expected to be about 3 months. Movements within the reservoir were directional, and it was common for fish to migrate repeatedly from the head of the reservoir downstream to the dam outlet and back to the head of the reservoir. Most fish were detected near the temperature control tower at least once. The median time from release near the head of the reservoir to detection within about 100 meters of the dam outlet at the temperature control tower was between 5.7 and 10.8 days, depending on season and fish origin. Dam passage events occurred over a wider range of dates in the spring and summer than in the fall and winter, but dam passage numbers were greatest during the fall and winter. A total of 10.5 percent (43 of 411) of the hatchery fish and 15.4 percent (4 of 26) of the wild fish released in the spring are assumed to have passed the dam, whereas a total of 25.3 percent (90 of 356) of the hatchery fish and 16.9 percent (30 of 117) of the wild fish released in the fall are assumed to have passed the dam. A small number of fish passed the dam after their transmitters had stopped working and were detected at

  7. Dams and Intergovernmental Transfers

    Science.gov (United States)

    Bao, X.

    2012-12-01

    Gainers and Losers are always associated with large scale hydrological infrastructure construction, such as dams, canals and water treatment facilities. Since most of these projects are public services and public goods, Some of these uneven impacts cannot fully be solved by markets. This paper tried to explore whether the governments are paying any effort to balance the uneven distributional impacts caused by dam construction or not. It showed that dam construction brought an average 2% decrease in per capita tax revenue in the upstream counties, a 30% increase in the dam-location counties and an insignificant increase in downstream counties. Similar distributional impacts were observed for other outcome variables. like rural income and agricultural crop yields, though the impacts differ across different crops. The paper also found some balancing efforts from inter-governmental transfers to reduce the unevenly distributed impacts caused by dam construction. However, overall the inter-governmental fiscal transfer efforts were not large enough to fully correct those uneven distributions, reflected from a 2% decrease of per capita GDP in upstream counties and increase of per capita GDP in local and downstream counties. This paper may shed some lights on the governmental considerations in the decision making process for large hydrological infrastructures.

  8. GIS inundation mapping and dam breach analysis of Woolwich Dam using HEC-geoRAS

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada); Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-07-01

    A study was conducted to determine the extent of flood inundation given a hypothetical dam breach scenario of the Woolwich Dam located in the Grand River Watershed, 2.5 km north of the Town of Elmira, Ontario. The dam is operated by the Grand River Conservation Authority and was constructed to provide low-flow augmentation to Canagagigue Creek. Advances in the computational capabilities of numerical models along with the availability of fine resolution geospatial data has lead to significant advances in the evaluation of catastrophic consequences due to the ensuing flood waters when dams fail. The hydraulic models HEC-RAS and HEC-GeoRAS were used in this study along with GIS to produce high resolution spatial and temporal flood inundation mapping. Given the proximity to the Town of Elmira, the dam is classified as having a high hazard potential. The large size and high hazard potential of the dam suggests that the Inflow Design Flood (IDF) is the Probable Maximum Flood (PMF) event. The outlet structure of the spillway consists of 4 ogee-type concrete spillways equipped with radial gates. A low-level concrete pipe located within the spillway structure provides spillage for maintenance purposes. The full flow capacity of the spillway structure is 297 cubic metres per second at the full supply level of 364.8 metres. In addition to GIS flood inundation maps, this paper included the results of flood hydrographs, water surface profiles and peak flow data. It was concluded that techniques used in this analysis should be considered for use in the development of emergency management planning and dam safety assessments across Canada. 6 refs., 3 tabs., 4 figs.

  9. Research on shape optimization of CSG dams

    Directory of Open Access Journals (Sweden)

    Xin Cai

    2011-12-01

    Full Text Available The multi-objective optimization method was used for shape optimization of cement sand and gravel (CSG dams in this study. The economic efficiency, the sensitivities of maximum horizontal displacement and maximum settlement of the dam to water level changes, the overall stability, and the overall strength security were taken into account during the optimization process. Three weight coefficient selection schemes were adopted to conduct shape optimization of a dam, and the case studies lead to the conclusion that both the upstream and downstream dam slope ratios for the optimal cross-section equal 1:0.7, which is consistent with the empirically observed range of 1:0.6 to 1:0.8 for the upstream and downstream dam slope ratios of CSG dams. Therefore, the present study is of certain reference value for designing CSG dams.

  10. The World Commission on Dams + 10: Revisiting the Large Dam Controversy

    Directory of Open Access Journals (Sweden)

    Deborah Moore

    2010-06-01

    Full Text Available The World Commission on Dams (WCD was an experiment in multi-stakeholder dialogue and global governance concerned with a subject area – large dams – that was fraught with conflict and controversy. The WCD Report, Dams and Development: A New Framework for Decision-Making, was published in 2000 and accompanied by hopes that broad-based agreements would be forged on how to better manage water and energy development. Ten years later, this special issue of Water Alternatives revisits the WCD and its impacts, exploring the question: Is the WCD still relevant? The editorial team and the Guest Editors of this special issue of Water Alternatives have selected a range of 20 papers, 6 viewpoints, and 4 book reviews that help to illustrate the evolution in the dams debate. The goal of this special issue is to examine the influence and the impacts of the WCD on the dam enterprise, in general, and on the policies and practices of key stakeholders and institutions, and on the development outcomes for affected communities and environments, in particular. In this introduction, the Guest Editors provide an overview of the special issue, exploring the new drivers of dam development that have emerged during the last decade, including climate change and new financiers of dams, and describing the themes emerging from this diverse set of papers and viewpoints. This special issue demonstrates the need for a renewed multi-stakeholder dialogue at multiple levels. This would not be a redo of the WCD, but rather a rekindling and redesigning of processes and forums where mutual understanding, information-sharing, and norm-setting can occur. One of the most promising developments of the last decade is the further demonstration, in case studies described here, that true partnership amongst key stakeholders can produce transformative resource-sharing agreements, showing that many of the WCD recommendations around negotiated decision making are working in practice. We hope

  11. The (recreation of postmodern spanish cities. The role of immigrants

    Directory of Open Access Journals (Sweden)

    Jesús M. González Pérez

    2004-12-01

    Full Text Available The consequences of full incorporation into the European Union and the effects of globali-sation contributed to the modification of social structures in Spain. The accelerated rise in immigration has been decisive in creating the post-modern Spanish city. The cities of the twenty-first century are more complex, but also more cosmopolitan, multi-cultural, rich and dynamic.

  12. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong; Bao, Kai; Zhang, Hui

    2011-01-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  13. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong

    2011-08-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors\\' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  14. Tenaga Nasional Berhad dam safety and surveillance program

    International Nuclear Information System (INIS)

    Jansen Luis; Zulkhairi Abd Talib

    2006-01-01

    This paper discusses the current practice of dam surveillance, which includes dam monitoring which is a process of visual inspections, measuring, processing, compiling and analyzing dam instrumentation data to determine the performance of a dam. The prime objective of the dam surveillance system is to ensure that any occurrence and development of safety deficiencies and problems are quickly detected, identified, analyzed and the required remedial actions are determined and consequently carried out in due time. In brief, the section is responsible to ensure that the dam monitoring and surveillance works are implemented as per scheduled and in accordance with the requirement and guidelines prepared by the dam designers and in accordance with international commission on large dams, ICOLD. The paper also illustrates and recommends an alternative approach for dam surveillance program using risk management approach, which is currently being actively adopted by some countries like USA, Canada, Australia and etc, towards improving the dam safety management and the decision making process. The approach provides a wider area of opportunity, improvements and benefits particular in the evaluation and modifications to the dam performance and safety. The process provides an effective and efficient tool for the decision makers and engineers through a comprehensive evaluation and a good understanding of the hazards, risks and consequences in relation to dam safety investigations. (Author)

  15. WinDAM C earthen embankment internal erosion analysis software

    Science.gov (United States)

    Two primary causes of dam failure are overtopping and internal erosion. For the purpose of evaluating dam safety for existing earthen embankment dams and proposed earthen embankment dams, Windows Dam Analysis Modules C (WinDAM C) software will simulate either internal erosion or erosion resulting f...

  16. Proceedings of the Canadian Dam Association's 2005 annual conference : 100 years of dam experience : balancing tradition and innovation. CD-ROM ed.

    International Nuclear Information System (INIS)

    2004-09-01

    This conference provided a forum to promote discussion on improving the management and safety of dams. It featured 8 technical sessions as well as workshops to discuss dam safety guidelines and guidelines for extreme flood analyses and their applications. It also featured workshops on instrumentation and performance monitoring of dams; tailing dam closures and reclamation; and, practical approaches to emergency preparedness for dam owners. The discussions provided details on large hydropower development projects, their innovations in environmental impact assessment, mitigation, and monitoring. The conference included a technical component led by experts on dams and tailings facilities. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and safety guidelines. All 24 presentations at this conference have been catalogued separately for inclusion in this database

  17. Sinkhole remediation at Swinging Bridge Dam

    Energy Technology Data Exchange (ETDEWEB)

    Jones, A. [Devine Tarbell and Associates, Portland, ME (United States)

    2009-07-01

    This case history summary described a piping-related sinkhole that occurred after a flood at the Swinging Bridge Dam. The earth-filled embankment dam was constructed using a hydraulic fill technique. A foundation drilling and grouting program was constructed in areas of the dam founded on jointed sandstone and shale. The storage volumes of the reservoir is 32,000 acre-feet. A sinkhole 25 to 300 feet in diameter was observed on May 5, 2005 along the edge of the dam crest. The sinkhole extended to within 10 feet of the reservoir and was separated by a shallow berm of soil and driftwood. Cracking of the crest extended across an area of 180 feet. Operations staff notified the appropriate agencies, implemented a monitoring program, and mobilized construction equipment and sands for use as emergency sinkhole filler. An increase in tailrace turbidity was observed. Historical records for the dam showed significant cracking during the initial filling of the reservoir. Failure modes included increased pore pressures and seepages resulting in the piping of soil along the outside of the dam conduit. Emergency repairs included chemical grouting and weld repairs in the penstocks. A Federal Emergency Management Agency (FEMA) is currently addressing safety issues associated with conduits through dams. 4 refs., 11 figs.

  18. Dynamic tests at the Outardes 3 dam

    International Nuclear Information System (INIS)

    Proulx, J.; Paultre, P.; Duron, Z.; Tai Mai Phat; Im, O.

    1992-01-01

    At the Outardes 3 gravity dam, part of the Manicouagan-Outardes hydroelectric complex in northeastern Quebec, forced vibration tests were carried out using an eccentric mass shaker attached to the dam crest at three different locations. Accelerations were measured along the crest and in the inspection galleries, and hydrodynamic pressures were measured along the upstream dam face and at various locations in the reservoir. The tests were designed to analyze the effects of gravity dam-reservoir interactions and to generate a data base for calibrating finite element models used in studying the dynamic behavior of gravity dams. Experimental results are presented in order to demonstrate the quality of the data obtained and the effectiveness of the experimental procedures. Modes of vibration were observed which corresponded to those obtained by finite element analysis. It is shown that techniques recently developed for dynamic tests on large dams can be successfully used on gravity dams. 3 refs., 6 figs

  19. Environmental assessment of the area surrounding Dam Rio Verde - Parana/Brazil. An overview of environmental geomorphology.

    Science.gov (United States)

    Garcia, Claudia Moreira; Carrijo, Beatriz Rodrigues; Sessegolo, Gisele; Passos, Everton

    2012-04-01

    This paper presents a brief essay on the situation in which the environment of the dam of the Rio Verde Basin-Parana, from the vision of environmental geomorphology. The area is located between the cities of Campo Magro and Campo Largo, Paraná plateau in the first part of theAlto Iguaçu basin. This study aims to raise the concepts relating to environmental geomorphology, to identify the anthropogenic impacts caused in the reservoir areas, identify the environmental compartments found around the dam and characterize the geologic and physiographic region. It was found that the area has intense anthropogenic influence, as urban growth is present in areas and wavy and rough terrain, subject to mass movements and floods. Besides these aspects, the use of land for agriculture contributes to fragility of the area.

  20. An Initial Analysis of LANDSAT-4 Thematic Mapper Data for the Discrimination of Agricultural, Forested Wetlands, and Urban Land Cover. [Poinsett County, Arkansas; and Reelfoot Lake and Union City, Tennessee

    Science.gov (United States)

    Quattrochi, D. A.

    1985-01-01

    The capabilities of TM data for discriminating land covers within three particular cultural and ecological realms was assessed. The agricultural investigation in Poinsett County, Arkansas illustrates that TM data can successfully be used to discriminate a variety of crop cover types within the study area. The single-date TM classification produced results that were significantly better than those developed from multitemporal MSS data. For the Reelfoot Lake area of Tennessee TM data, processed using unsupervised signature development techniques, produced a detailed classification of forested wetlands with excellent accuracy. Even in a small city of approximately 15,000 people (Union City, Tennessee). TM data can successfully be used to spectrally distinguish specific urban classes. Furthermore, the principal components analysis evaluation of the data shows that through photointerpretation, it is possible to distinguish individual buildings and roof responses with the TM.

  1. Flood risk assessment through 1D/2D couple HEC-RAS hydrodynamic modeling- A case study of Surat City, Lower Tapi Basin, India

    Science.gov (United States)

    Patel, Dhruvesh; Ramirez, Jorge; Srivastava, Prashant; Bray, Michaela; Han, Dawei

    2017-04-01

    Surat, known as the diamond city of Gujart is situated 100 km downstream of Ukai dam and near the mouth of river Tapi and affected by the flood at every alternate year. The city experienced catastrophic floods in 1933, 1959, 1968, 1970, 1994, 1998 and 2006. It is estimated that a single flood event during August 6-12, 2006 in Surat and Hazira twin-city, caused heavy damages, resulted in the death of 300 people and property damage worth € 289 million. The peak discharge of 25768 m3 s-1 release from Ukai dam was responsible for the disastrous flood in Surat city. To identifylow lying areas prone to inundation and reduce the uncertainty in flood mitigation measures, HEC-RAS based 1D/2D Couple hydrodynamic modeling is carried out for Surat city. Release from the Ukai dam and tidal level of the sea are considered for upstream and downstream boundary condition. 299 surveyed cross-sections have been considered for 1D modeling, whereas a topographic map at 0.5 m contour interval was used to produce a 5 m grid and SRTM (30 & 90 m) grid has been considered for Suart and Lower Tapi Basin (LTB). Flow is simulated under unsteady conditions, calibrated for the year 1998 and validated for the year 2006. The simulated result shows that the 9th August 18.00 hr was the worst day for Surat city and maximum 75-77 % area was under inundation. Most of the flooded area experienced 0.25 m/s water velocity with the duration of 90 hr. Due to low velocity and high duration of the flood, a low lying area within the west zone and south-west zone of the city was badly affected by the flood, whereas the south zone and south-east zone was least. Simulated results show good correlation when compared with an observed flood level map. The simulated results will be helpful to improve the flood resilience strategy at Surat city and reduce the uncertainty for flood inundation mapping for future dam releases. The present case study shows the applicability of 1D/2D coupled hydrodynamic modeling for

  2. Modeling the capacity of riverscapes to support beaver dams

    Science.gov (United States)

    Macfarlane, William W.; Wheaton, Joseph M.; Bouwes, Nicolaas; Jensen, Martha L.; Gilbert, Jordan T.; Hough-Snee, Nate; Shivik, John A.

    2017-01-01

    The construction of beaver dams facilitates a suite of hydrologic, hydraulic, geomorphic, and ecological feedbacks that increase stream complexity and channel-floodplain connectivity that benefit aquatic and terrestrial biota. Depending on where beaver build dams within a drainage network, they impact lateral and longitudinal connectivity by introducing roughness elements that fundamentally change the timing, delivery, and storage of water, sediment, nutrients, and organic matter. While the local effects of beaver dams on streams are well understood, broader coverage network models that predict where beaver dams can be built and highlight their impacts on connectivity across diverse drainage networks are lacking. Here we present a capacity model to assess the limits of riverscapes to support dam-building activities by beaver across physiographically diverse landscapes. We estimated dam capacity with freely and nationally-available inputs to evaluate seven lines of evidence: (1) reliable water source, (2) riparian vegetation conducive to foraging and dam building, (3) vegetation within 100 m of edge of stream to support expansion of dam complexes and maintain large colonies, (4) likelihood that channel-spanning dams could be built during low flows, (5) the likelihood that a beaver dam is likely to withstand typical floods, (6) a suitable stream gradient that is neither too low to limit dam density nor too high to preclude the building or persistence of dams, and (7) a suitable river that is not too large to restrict dam building or persistence. Fuzzy inference systems were used to combine these controlling factors in a framework that explicitly also accounts for model uncertainty. The model was run for 40,561 km of streams in Utah, USA, and portions of surrounding states, predicting an overall network capacity of 356,294 dams at an average capacity of 8.8 dams/km. We validated model performance using 2852 observed dams across 1947 km of streams. The model showed

  3. National dam inventory provides data for analysis

    International Nuclear Information System (INIS)

    Spragens, L.

    1992-01-01

    The Association of State Dam Safety Officials completed a dam inventory this fall. Information on approximately 90,000 state-regulated dams in the US collected during the four-year inventory is being used to build a database managed by the Federal Emergency Management Agency. In addition to ASDSO's work, the federal government conducted an inventory of federal dams. This data will be added to the state information to form one national database. The database will feature 35 data fields for each entry, including the name of the dam, its size, the name of the nearest downstream community, maximum discharge and storage volume, the date of the last inspection, and details about the emergency action plan. The program is an update of the nation's first dam inventory, required by the Dam Safety Act of 1972. The US Army Corps of Engineers completed the original inventory in 1981. The Water Resources Development Act of 1986 authorized appropriations of $2.5 million for the Corps to update the inventory. FEMA and the Corps entered into an agreement for FEMA to undertake the task for the Corps and to coordinate work on both the federal and state inventories. ASDSO compiles existing information on state-regulated dams into a common format for the database, added missing information, and established a process for continually updating data. ASDSO plans to analyze the information collected for the database. It will look at statistics for the number of dams regulated, communities that could be affected, and the number of high-hazard dams. FEMA is preparing reports for Congress on the project. The reports, which are expected to be ready by May 1993, will include information on the methodology used and facts about regulated dams under state jurisdiction

  4. Seismic failure modes and seismic safety of Hardfill dam

    Directory of Open Access Journals (Sweden)

    Kun Xiong

    2013-04-01

    Full Text Available Based on microscopic damage theory and the finite element method, and using the Weibull distribution to characterize the random distribution of the mechanical properties of materials, the seismic response of a typical Hardfill dam was analyzed through numerical simulation during the earthquakes with intensities of 8 degrees and even greater. The seismic failure modes and failure mechanism of the dam were explored as well. Numerical results show that the Hardfill dam remains at a low stress level and undamaged or slightly damaged during an earthquake with an intensity of 8 degrees. During overload earthquakes, tensile cracks occur at the dam surfaces and extend to inside the dam body, and the upstream dam body experiences more serious damage than the downstream dam body. Therefore, under the seismic conditions, the failure pattern of the Hardfill dam is the tensile fracture of the upstream regions and the dam toe. Compared with traditional gravity dams, Hardfill dams have better seismic performance and greater seismic safety.

  5. Qu'Appelle River Dam, dam break analysis using advanced GIS tools for rapid modelling and inundation mapping

    Energy Technology Data Exchange (ETDEWEB)

    Bonin, D. [Hatch Energy, Winnipeg, MB (Canada); Campbell, C. [Saskatchewan Watershed Authority, Moose Jaw, SK (Canada); Groeneveld, J. [Hatch Energy, Calgary, AB (Canada)

    2008-07-01

    The South Saskatchewan River Project (SSRP) comprises a multi-purpose reservoir that provides water for conservation and irrigation, flood control, power generation, recreation, and municipal and industrial water supply. In addition to the 64 m high Gardiner Dam, the 27 m high Qu'Appelle River Dam and the 22 km long Lake Diefenbaker Reservoir, the SSRP also includes ancillary works. The Qu'Appelle River valley extends for 458 km before connecting to the Assiniboine River. The valley is incised up to 90 m in depth and is a popular cottaging and recreational area with several major communities located in the flood plain. In the event of a breach of the Qu'Appelle Dam, the discharge will increase from a normal maximum discharge of under 60 m{sup 3} per second to over 50,000 m{sup 3} per second. The Saskatchewan Watershed Authority (SWA) is responsible for ensuring safe development of the Province's water resources, without affecting reservoir or lake operations, and preventing damage from flooding, erosion or land slides. It is in the process of developing Hazard Assessments and emergency preparedness plans for each of their dams in accordance with the Canadian Dam Safety Guidelines. Studies using GIS technology and the hydrodynamic routing model HEC-RAS have been completed to evaluate the potential inundation that may result in the event of failure of the Qu'Appelle River Dam. These studies involved the development of a breach parameter model using a breach data set revised to better reflect the Qu'Appelle River Dam; the development of a dam break model for the Qu'Appelle River Dam and downstream river and flood plain; and, the use of this model to simulate two potential dam failure scenarios for the Qu'Appelle River Dam, notably failure during passage of the PMF and failure during fair weather conditions. Inundation maps have been prepared for the downstream Qu'Appelle River valley for each of the above events. 3 refs., 4

  6. Dam Design can Impede Adaptive Management of Environmental Flows: A Case Study from the Opuha Dam, New Zealand

    Science.gov (United States)

    Lessard, JoAnna; Murray Hicks, D.; Snelder, Ton H.; Arscott, David B.; Larned, Scott T.; Booker, Doug; Suren, Alastair M.

    2013-02-01

    The Opuha Dam was designed for water storage, hydropower, and to augment summer low flows. Following its commissioning in 1999, algal blooms (dominated first by Phormidium and later Didymosphenia geminata) downstream of the dam were attributed to the reduced frequency and magnitude of high-flow events. In this study, we used a 20-year monitoring dataset to quantify changes associated with the dam. We also studied the effectiveness of flushing flows to remove periphyton from the river bed. Following the completion of the dam, daily maximum flows downstream have exceeded 100 m3 s-1 only three times; two of these floods exceeded the pre-dam mean annual flood of 203 m3 s-1 (compared to 19 times >100 m3 s-1 and 6 times >203 m3 s-1 in the 8 years of record before the dam). Other changes downstream included increases in water temperature, bed armoring, frequency of algal blooms, and changes to the aquatic invertebrate community. Seven experimental flushing flows resulted in limited periphyton reductions. Flood wave attenuation, bed armoring, and a shortage of surface sand and gravel, likely limited the effectiveness of these moderate floods. Floods similar to pre-dam levels may be effective for control of periphyton downstream; however, flushing flows of that magnitude are not possible with the existing dam infrastructure. These results highlight the need for dams to be planned and built with the capacity to provide the natural range of flows for adaptive management, particularly high flows.

  7. The interplay of activists and dam developers : the case of Myanmar’s mega-dams

    NARCIS (Netherlands)

    Kirchherr, Julian|info:eu-repo/dai/nl/411261487; J. Charles, Katrina; Walton, Matthew J.

    2017-01-01

    Scholars investigating activism against large dam developments in Asia usually focus on those campaigning, but not on those the campaigns are aimed at–the dam developers. Yet the developers’ perspective is crucial to comprehensively understand the dynamics of social and environmental activism in

  8. Hydrobiological aspects of Paraibuna and Paraitinga dams. Sao Paulo, with emphasis on phytoplankton community

    International Nuclear Information System (INIS)

    Matos, Janara de Camargo

    2010-01-01

    The inland waters are less on the Earth's surface and are extremely important for the survival of living things, why the concern for quality increases daily. The dams Paraibuna and Paraitinga, located in Paraibuna city, state of Sao Paulo, totaling 224 km 2 of extension of water surface, with the current function of generating electricity. In order to analyze the water quality of these dams, this paper presents a diagnostic physical, chemical, and biological, which was used in the phytoplankton community and calculation of quality indexes. Four samples were taken at nine sampling points distributed along the dams. The physical and chemical analysis of water showed low concentrations of nutrients such as nitrate (mean 0,42 ± 0,23 mg.L -1 and phosphate ( -1 ). Most metals and trace elements analyzed were within the limit established by federal law. The element phosphorus (mean 0,0293 ± 0,0153 mg.L -1 ) is presented above the values established by CONAMA Resolution 357/05 (0,020 mg.L -1 ) on all sampling points in the month of May, but this fact did not seem to influence the phytoplankton amount. High levels of dissolved oxygen and transparency, low levels of turbidity, conductivity and dissolved solids, pH close to neutrality, together with high diversity and low dominance of phytoplankton, with a predominance of green algae, showed that the dams still retain features of aquatic environment preserved, which suffer little influence of anthropogenic factors. However, the presence, even at low densities, of cyanobacteria and the existence of plantations and livestock activities in the borders of these dams deserve special attention in terms of their correct management to not become harmful factors to the quality of those waters. (author)

  9. Factors influencing hysteresis characteristics of concrete dam deformation

    Directory of Open Access Journals (Sweden)

    Jia-he Zhang

    2017-04-01

    Full Text Available Thermal deformation of a concrete dam changes periodically, and its variation lags behind the air temperature variation. The lag, known as the hysteresis time, is generally attributed to the low velocity of heat conduction in concrete, but this explanation is not entirely sufficient. In this paper, analytical solutions of displacement hysteresis time for a cantilever beam and an arch ring are derived. The influence of different factors on the displacement hysteresis time was examined. A finite element model was used to verify the reliability of the theoretical analytical solutions. The following conclusions are reached: (1 the hysteresis time of the mean temperature is longer than that of the linearly distributed temperature difference; (2 the dam type has a large impact on the displacement hysteresis time, and the hysteresis time of the horizontal displacement of an arch dam is longer than that of a gravity dam; (3 the reservoir water temperature variation lags behind of the air temperature variation, which intensifies the differences in the horizontal displacement hysteresis time between the gravity dam and the arch dam; (4 with a decrease in elevation, the horizontal displacement hysteresis time of a gravity dam tends to increase, whereas the horizontal displacement hysteresis time of an arch dam is likely to increase initially, and then decrease; and (5 along the width of the dam, the horizontal displacement hysteresis time of a gravity dam decreases as a whole, while the horizontal displacement hysteresis time of an arch dam is shorter near the center and longer near dam surfaces.

  10. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The paper reports on the conclusions of decennial and annual inspections of French dams. Dams surveillance is performed by the operators and consists in visual examinations and measurements. Concrete dams, in particular, always have more or less developed fissures with water sweating threw the concrete mass or the foundations. Old concrete often show low swelling phenomena which are measured too. (J.S.)

  11. Cultural-resource survey report: Hoover Dam Powerplant Modification Project II. Associated transmission-line facility

    International Nuclear Information System (INIS)

    Queen, R.L.

    1991-06-01

    The Bureau of Reclamation (Reclamation) is proposing to modify or install additional transmission facilities between the Hoover Dam hydroelectric plant and the Western Area Power Authority substation near Boulder City, Nevada. Reclamation has completed cultural resource investigations to identify historic or prehistoric resources in the project area that might be affected during construction of the transmission line. Four possible transmission corridors approximately 50 feet wide and between 9.5 and 11.5 miles long were investigated. The proposed transmission lines either parallel or replace existing transmission lines. The corridors generally have undergone significant disturbance from past transmission line construction. A Class II sampling survey covering approximately 242 acres was conducted. Access or construction roads have not been identified and surveys of these areas will have to be completed in the future. No historic or prehistoric archeological sites were encountered within the four corridor right-of-ways. It is believed that the probability for prehistoric sites is very low. Four historic period sites were recorded that are outside, but near, the proposed corridor. These sites are not individually eligible for the National Register of Historic Places, but may be associated with the construction of Hoover Dam and contribute to a historic district or multiple property resource area focusing on the dam and its construction

  12. TRESCIMO: European Union and South African smart city contextual dimension

    CSIR Research Space (South Africa)

    Coetzee, L

    2015-12-01

    Full Text Available the question is raised if insights into a South African Smart City can strengthen European initiatives. A need for inter-continental automated testing facilities such as those developed by TRESCIMO is identified through which integrated experiments can...

  13. Dam safety management in Victoria (Australia)

    International Nuclear Information System (INIS)

    Adem, J.

    1996-01-01

    The Victoria state government's decision to make dam owners accountable for safety and upkeep of their dams was reported. To give effect to this decision a series of guidelines have been developed which outline the required activities and skills to ensure that dams are properly managed within a framework of 'light-handed' regulation. The guidelines are also intended to ensure that dam management becomes an integral part of the business decision making process, not just a set of prescribed technical procedures. Details of the direction being taken and the proposed controls to ensure compliance with national and international standards were described. 4 refs., 2 figs

  14. Use of oxidative stress biomarkers in Cyprinus carpio L. for the evaluation of water pollution in Ataturk Dam Lake (Adiyaman, Turkey).

    Science.gov (United States)

    Karadag, Hasan; Fırat, Özgür; Fırat, Özge

    2014-03-01

    Adiyaman city, which is located in the north of the Ataturk Dam Lake, has no wastewater purification facilities which results in municipal, agricultural, and industrial wastewater discharges directly entering the reservoir. To assess the pollution in the dam lake, we used several oxidative stress biomarkers in blood tissue of Cyprinus carpio. Fish samples were taken from Sitilce, polluted area by untreated wastewaters, and Samsat, relatively clean area, in the reservoir in August 2012. The activity of catalase and level of malondialdehyde increased while activity of superoxide dismutase and glutathione level decreased in fish from Sitilce site when compared to Samsat site. The findings of the present investigation suggest that the presence of certain prooxidative compounds that can lead to oxidative stress in the fish at the Sitilce site and oxidative stress biomarkers may be important in order to evaluate the effects of untreated wastewaters on living organisms in the dam lake.

  15. A new science competition for secondary school students : the First European Union Science Olympiad

    NARCIS (Netherlands)

    van Kampen, P; Browne, WR; Burke, M; Cotter, MA; James, P; McGlynn, E; O'Kennedy, R; Smyth, P; Whelan, G

    The first European Union Science Olympiad (EUSO2003) took place at Dublin City University in April 2003. In this paper we discuss the philosophy behind and implementation of this new competition, and the role third-level institutions can play in making science more attractive to second-level

  16. Implementation Of The Local Minimum Wage In Malang City (A Case Study in Malang City 2014

    Directory of Open Access Journals (Sweden)

    Dhea Candra Dewi Candra Dewi

    2015-04-01

    Full Text Available Wage system in a framework of how wages set and defined in order to improve the welfare of worker. The Indonesian government attempt to set a minimum wage in accordance with the eligibility standard of living. The study intend to analize the policy of Local Minimum Wage in Malang City in 2014, its implementation and constraining factors of those Local Minimum Wages. The research uses interactive model analysis as introduced by Miles and Hubermann [6] that consist of data collection, data reduction, data display, and conclusion. Constraining factors seen at the respond given by relevant actors to the policy such as employer organizations, worker unions, wage councils, and local government. Firstly, company as employer organization does not use wage scale system as suggested by the policy. Secondly, lack of communication forum between company and worker union sounds very high. Thirdly, inability of small and big companies to pay minimum standard wages. Lastly, disagreement and different opinion about wage scale applied between local wage council, employer organization and workers union that often occurs in tripartite communication forum.     Keywords: Employers Organization, Local Minimum Wage, Local Wage Council, Policy Implementation, Tripartite Communication forum, Workers Union.

  17. Exporting dams: China's hydropower industry goes global.

    Science.gov (United States)

    McDonald, Kristen; Bosshard, Peter; Brewer, Nicole

    2009-07-01

    In line with China's "going out" strategy, China's dam industry has in recent years significantly expanded its involvement in overseas markets. The Chinese Export-Import Bank and other Chinese financial institutions, state-owned enterprises, and private firms are now involved in at least 93 major dam projects overseas. The Chinese government sees the new global role played by China's dam industry as a "win-win" situation for China and host countries involved. But evidence from project sites such as the Merowe Dam in Sudan demonstrates that these dams have unrecognized social and environmental costs for host communities. Chinese dam builders have yet to adopt internationally accepted social and environmental standards for large infrastructure development that can assure these costs are adequately taken into account. But the Chinese government is becoming increasingly aware of the challenge and the necessity of promoting environmentally and socially sound investments overseas.

  18. Measuring and managing safety at Wahleach Dam

    International Nuclear Information System (INIS)

    Salmon, G. M.; Cattanach, J. D.; Hartford, D. N. D.

    1996-01-01

    Safety improvements recently implemented at the Wahleach Dam were described as one of the first instances in international dam safety practice where risk concepts have been used in conjunction with acceptable risk criteria to evaluate safety of a dam relative to required level of safety. Erosion was identified as the greatest threat to the safety of the dam. In addressing the deficiencies B.C. Hydro formulated a process which advocates a balanced level of safety,i.e. the probability of failure multiplied by the consequences of failure, integrated over a range of initiators. If the risk posed by the dam is lower than a 'tolerable' risk, the dam is considered to be safe enough. In the case of the Wahleach Dam, the inflow design flood (IDF) was selected to be about one half of the probable maximum flow (PMF), hence it was more likely than not that the spillway could pass floods up to and including the PMF. By accepting the determined level of risk, expenditures of several million dollars for design and construction of dam safety improvements were made redundant. Another byproduct of this new concept of risk assessment was the establishment of improved life safety protection by means of an early warning system for severe floods through the downstream community and emergency authorities. 3 refs., 5 tabs

  19. Brazil's Balbina Dam: Environment versus the legacy of the Pharaohs in Amazonia

    Science.gov (United States)

    Fearnside, Philip M.

    1989-07-01

    The Balbina Dam in Brazil's state of Amazonas floods 2360 km2 of tropical forest to generate an average of only 112.2 MW of electricity. The flat topography and small size of the drainage basin make output small. Vegetation has been left to decompose in the reservoir, resulting in acidic, anoxic water that will corrode the turbines. The shallow reservoir contains 1500 islands and innumerable stagnant bays where the water's residence time will be even longer than the average time of over one year. Balbina was built to supply electricity to Manaus, a city that has grown so much while the dam was under construction that other alternatives are already needed. Government subsidies explain the explosive growth, including Brazil's unified tariff for electricity. Alternative power sources for Manaus include transmission from more distant dams or from recently discovered oil and natural gas deposits. Among Balbina's impacts are loss of potential use of the forest and displacement of about one third of the surviving members of a much-persecuted Amerindian tribe: the Waimiri-Atroari. The dam was closed on 1 October 1987 and the first of five generators began operation in February 1989. The example of Balbina points to important ways that the decision-making process could be improved in Brazil and in the international funding agencies that have directly and indirectly contributed to the project. Environmental impact analyses must be completed prior to decisions on overall project implementation and must be free of influence from project proponents. The current environmental impact assessment system in Brazil, as in many other countries, has an undesirable influence on science policy, in addition to failing to address the underlying causes of environmentally destructive development processes and inability to halt “irreversible” projects like Balbina.

  20. Large dams and alluvial rivers in the Anthropocene: The impacts of the Garrison and Oahe Dams on the Upper Missouri River

    Science.gov (United States)

    Skalak, Katherine; Benthem, Adam J.; Schenk, Edward R.; Hupp, Cliff R.; Galloway, Joel M.; Nustad, Rochelle A.; Wiche, Gregg J.

    2013-01-01

    The Missouri River has had a long history of anthropogenic modification with considerable impacts on river and riparian ecology, form, and function. During the 20th century, several large dam-building efforts in the basin served the needs for irrigation, flood control, navigation, and the generation of hydroelectric power. The managed flow provided a range of uses, including recreation, fisheries, and habitat. Fifteen dams impound the main stem of the river, with hundreds more on tributaries. Though the effects of dams and reservoirs are well-documented, their impacts have been studied individually, with relatively little attention paid to their interaction along a river corridor. We examine the morphological and sedimentological changes in the Upper Missouri River between the Garrison Dam in ND (operational in 1953) and Oahe Dam in SD (operational in 1959). Through historical aerial photography, stream gage data, and cross sectional surveys, we demonstrate that the influence of the upstream dam is still a major control of river dynamics when the backwater effects of the downstream reservoir begin. In the “Anthropocene”, dams are ubiquitous on large rivers and often occur in series, similar to the Garrison Dam Segment. We propose a conceptual model of how interacting dams might affect river geomorphology, resulting in distinct and recognizable morphologic sequences that we term “Inter-Dam sequence” characteristic of major rivers in the US.

  1. Stability of earth dam with a vertical core

    Directory of Open Access Journals (Sweden)

    Orekhov Vyacheslav Valentinovich

    2016-01-01

    Full Text Available Earth dam with impervious element in the form of asphaltic concrete core is currently the most promising type of earth dams (due to simple construction technology and universal service properties of asphaltic concrete and is widely used in the world. However, experience in the construction and operation of high dams (above 160 m is not available, and their work is scarcely explored. In this regard, the paper discusses the results of computational prediction of the stress-strain state and stability of a high earth dam (256 m high with the core. The authors considered asphaltic concrete containing 7 % of bitumen as the material of the core. Gravel was considered as the material of resistant prisms. Design characteristics of the rolled asphaltic concrete and gravel were obtained from the processing of the results of triaxial tests. The calculations were performed using finite element method in elastoplastic formulation and basing on the phased construction of the dam and reservoir filling. The research shows, that the work of embankment dam with vertical core during filling of the reservoir is characterized by horizontal displacement of the lower resistant prism in the tailrace and the formation of a hard wedge prism descending along the core in the upper resistant prism. The key issue of the safety assessment is to determine the safety factor of the overall stability of the dam, for calculation of which the destruction of the earth dam is necessary, which can be done by reducing the strength properties of the dam materials. As a results of the calculations, the destruction of the dam occurs with a decrease in the strength characteristics of the materials of the dam by 2.5 times. The dam stability depends on the stability of the lower resistant prism. The destruction of its slope occurs on the classical circular-cylindrical surface. The presence of a potential collapse surface in the upper resistant prism (on the edges of the descending wedge does

  2. The changing hydrology of a dammed Amazon

    Science.gov (United States)

    Timpe, Kelsie; Kaplan, David

    2017-01-01

    Developing countries around the world are expanding hydropower to meet growing energy demand. In the Brazilian Amazon, >200 dams are planned over the next 30 years, and questions about the impacts of current and future hydropower in this globally important watershed remain unanswered. In this context, we applied a hydrologic indicator method to quantify how existing Amazon dams have altered the natural flow regime and to identify predictors of alteration. The type and magnitude of hydrologic alteration varied widely by dam, but the largest changes were to critical characteristics of the flood pulse. Impacts were largest for low-elevation, large-reservoir dams; however, small dams had enormous impacts relative to electricity production. Finally, the “cumulative” effect of multiple dams was significant but only for some aspects of the flow regime. This analysis is a first step toward the development of environmental flows plans and policies relevant to the Amazon and other megadiverse river basins. PMID:29109972

  3. Isotope technique in JPS dam surveillance: its potential

    International Nuclear Information System (INIS)

    Sabri Hassan

    2006-01-01

    Controlling seepage is one of the most important requirements for safe dams. Any leakage at an earth embankment may be potentially dangerous since rapid internal erosion may quickly enlarge an initially minor defect. Thus dam owners need to have thorough surveillance programs that can forewarn of impending problems from seepage or other factors influencing the safety of dams. In carrying out dam surveillance works, all possible efforts should be considered and foreseeing the potential of isotope technique, JPS (Department of Irrigation and Drainage, Malaysia) and MINT (Malaysian Institute for Nuclear Technology Research) participated actively in the UNDP/RCA/IAEA program under RAS/8/093 project sponsored by the International Atomic Energy Agency (IAEA). Through these activities, it was noted that the technique demonstrated very promising potentials such as in assisting dam site selections, site investigations, watershed studies, dam and reservoir design, leakage investigations and sediments related issues, the two latter ones being relatively critical during the operational life of the dam. Establishment of baseline isotopic characteristics (or fingerprint), hydrochemistry, electrical conductivity and temperature profiles is underway for all JPS dams to be later utilized in diagnosing seepage related issues it is suggested that application of this technique be extended to other dam owners nationwide. (Author)

  4. Numerical modelling for stability of tailings dams

    OpenAIRE

    Auchar, Muhammad; Mattsson, Hans; Knutsson, Sven

    2013-01-01

    A tailings dam is a large embankment structure that is constructed to store the waste from the mining industry. Stability problems may occur in a tailings dam due to factors such as quick rate of raising, internal erosion and liquefaction. The failure of a tailings dam may cause loss of human life and environmental degradation. Tailings Dams must not only be stable during the time the tailings storage facility is in operation, but also long time after the mine is closed. In Sweden, the licens...

  5. THE DEVELOPMENT OF LEGAL RESPONSIBILITY FOR A SOCIALLY RESPONSIBLE BEHAVIOR FOR BUSINESS OPERATORS IN ROMANIA, MEMBER STATE OF EUROPEAN UNION

    OpenAIRE

    Laura MURESAN

    2016-01-01

    Legal responsibility represents an important component of social responsibility, together with ethical responsibility, ecological responsibility, economical responsibility and philanthropic responsibility. The integration of social responsibility into the activity of business operators in the Member states of European Union is pursued at European Union level. The article analyses the opinion of the Brasov city citizens, in the framework of a marketing research performed in 2015, as regards th...

  6. Dams and transnational advocacy: Political opportunities in transnational collective action

    Science.gov (United States)

    Fu, Teng

    Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even

  7. Environmental impacts of small dams on agriculture and ground water development: a case study of Khan pur Dam, Pakistan

    International Nuclear Information System (INIS)

    Ejaz, N.; Shahmim, M.A.; Elahi, A.; Khan, N.M.

    2012-01-01

    The water scarcity issues are increasing through out the world. Pakistan is also facing water crises and its water demands are increasing every day. During this research it is investigated that small dams are playing an important role for the sustainability of groundwater and agriculture. The main objective of this study was to assess the environmental impacts of small dam on agricultural and ground water. Proper planning and management of small dams may improve the sustainable agriculture in Pakistan. It is also concluded that small dams are significantly contributing towards economy, environment, local climate, recreational activities and crop production. Small dams can also be utilized for the production of electricity at local level. On the other hand, water management issues can be resolved by the involvement of local farmer's associations. Water losses through seepage, unlined channels and old irrigation methods are most critical in developing world. Considering the overall positive environmental impacts, construction of small dams must be promoted. (author)

  8. Large dams and risk management

    International Nuclear Information System (INIS)

    Cazelais, N.

    2003-01-01

    In July 1996, Quebec's Saguenay region was subjected to intensive rainfall which caused severe floods and uncontrolled release of several reservoirs, resulting in extensive damage to dam structures and reservoirs. The probability of occurrence for that disaster was 1:10,000. Following the disaster, the Quebec government established a dam management body entitled the Commission scientifique et technique sur la gestion des barrages, which pointed out several safety shortcomings of existing dams. Many were either very old or had undergone significant function change without being subsequently re-evaluated. A report by the Commission stated that damage following the floods could have been limited if the design and operating standards of the dams had been more stringent. A Dam Safety Act was adopted by the Quebec National Assembly on May 30, 2000 following recommendations to retain safer structures. The Act demands regular reporting of operating procedures. Seismic activity was noted as being a topic that requires in-depth examination since Quebec's St. Lawrence Valley, particularly the Charlevoix region, is one of Canada's largest seismic zones. The other is on the west coast in British Columbia. Earthquakes in Quebec are less intense than the ones in British Columbia, but they have higher frequency content which exerts a quasi-resonance wave effect which impacts roads, bridges, buildings and hydroelectric generating facilities. Hydro-Quebec is a public utility which owns 563 retaining structures, of which 228 are ranked as large dams that measure more than 15 metres high, 400 metres long and with a reservoir capacity of more than 1 million cubic metres of water. Hydro-Quebec addresses hydrological, seismic, technological and human risks through a dam safety procedure that includes structured plans for choosing best alternatives through staged exercises. Hazard levels are minimized through the adoption of emergency, prevention and alleviation measures. The utility

  9. 78 FR 62627 - Sam Rayburn Dam Rate

    Science.gov (United States)

    2013-10-22

    ..., Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative, Inc. (Contract No... Schedule SRD-08, Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative... ADMINISTRATION RATE SCHEDULE SRD-13 \\1\\ WHOLESALE RATES FOR HYDRO POWER AND ENERGY SOLD TO SAM RAYBURN DAM...

  10. Evaluatie Dam tot Damloop 2014

    NARCIS (Netherlands)

    Deutekom-Baart de la Faille, Marije

    In het weekend van 20 en 21 september 2014 vond de 30ste editie van de Dam tot Damloop plaats. Onderzoekers van de Hogeschool van Amsterdam en Hogeschool Inholland hebben bij de Dam tot Damloop een evaluatieonderzoek uitgevoerd met als doel het vinden van aanknopingspunten voor het structureel

  11. Unions, Vitamins, Exercise: Unionized Graduate Students

    Science.gov (United States)

    Dewberry, David R.

    2005-01-01

    After the turbulent labor history of America in the early to mid twentieth century, there has been a general decline of unions. Nevertheless, many graduate school teaching assistants are unionizing in attempts to gain better pay and benefits and remove themselves from an "Ivory Sweatshop." This article discusses a history of unions…

  12. The Total Risk Analysis of Large Dams under Flood Hazards

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2018-02-01

    Full Text Available Dams and reservoirs are useful systems in water conservancy projects; however, they also pose a high-risk potential for large downstream areas. Flood, as the driving force of dam overtopping, is the main cause of dam failure. Dam floods and their risks are of interest to researchers and managers. In hydraulic engineering, there is a growing tendency to evaluate dam flood risk based on statistical and probabilistic methods that are unsuitable for the situations with rare historical data or low flood probability, so a more reasonable dam flood risk analysis method with fewer application restrictions is needed. Therefore, different from previous studies, this study develops a flood risk analysis method for large dams based on the concept of total risk factor (TRF used initially in dam seismic risk analysis. The proposed method is not affected by the adequacy of historical data or the low probability of flood and is capable of analyzing the dam structure influence, the flood vulnerability of the dam site, and downstream risk as well as estimating the TRF of each dam and assigning corresponding risk classes to each dam. Application to large dams in the Dadu River Basin, Southwestern China, demonstrates that the proposed method provides quick risk estimation and comparison, which can help local management officials perform more detailed dam safety evaluations for useful risk management information.

  13. Analysis the dynamic response of earth dam in free vibration and forced by introducing the effect of the interaction dam foundation

    Directory of Open Access Journals (Sweden)

    Malika Boumaiza

    2018-01-01

    Full Text Available The present study concerns the analysis of the dynamic response of earth dam, in free and forced vibration (under the effect of earthquake using the finite element method. The analysis is carried out at the end of dam construction without filling. The behavior of the dam materials and the foundation is linear elastic. In free vibration, to better understand the effect of the dam foundation interaction, we will take into account different site conditions and see their influence on the free vibration characteristics of the dam. In forced vibration, to study the seismic response of the dam, the system is subjected to the acceleration of the Boumerdes earthquake of May 21, 2003 recorded at the station n ° 2 of the dam of Kaddara in the base, with a parametric study taking into account the influence of the main parameters such as the mechanical properties of the soil: rigidity, density.

  14. Ice interactions at a dam face

    Energy Technology Data Exchange (ETDEWEB)

    Morse, B.; Morse, J.; Beaulieu, P.; Pratt, Y. [Laval Univ., Quebec City, PQ (Canada). Dept. of Civil Engineering; Stander, E. [State Univ. of New York, Cobleskill College, Cobleskill, NY (United States). Dept. of Natural Sciences; Cote, A.; Tarras, A.; Noel, P. [Hydro-Quebec, Varennes, PQ (Canada). IREQ

    2009-07-01

    This paper reported on a joint research project between Laval University and Hydro-Quebec to study ice forces on dams in an effort to harmonize design criteria and develop mitigation strategies. This paper introduced the project and explored some of the preliminary results of the 2007-2008 field season. Ice displacement, ice stresses and ice forces on the LaGabelle dam were measured at several locations. The paper identified and discussed the complex relationships between data sets and discussed the spatial-temporal variability of the ice forces and its impact on design criteria. The project objective was to develop design criteria for ice forces on dams and to provide a scientific basis for interpreting and harmonizing existing recommended criteria. The methodology and site description were presented. It was concluded that the ice processes in a reservoir near a dam face subject to water fluctuations are quite complex. Therefore, in order to know the real average pressure on the dam, a significant amount of panels are required, having important implications for determining safe design values. 9 refs., 10 figs.

  15. Thermal effects of dams in the Willamette River basin, Oregon

    Science.gov (United States)

    Rounds, Stewart A.

    2010-01-01

    Methods were developed to assess the effects of dams on streamflow and water temperature in the Willamette River and its major tributaries. These methods were used to estimate the flows and temperatures that would occur at 14 dam sites in the absence of upstream dams, and river models were applied to simulate downstream flows and temperatures under a no-dams scenario. The dams selected for this study include 13 dams built and operated by the U.S. Army Corps of Engineers (USACE) as part of the Willamette Project, and 1 dam on the Clackamas River owned and operated by Portland General Electric (PGE). Streamflows in the absence of upstream dams for 2001-02 were estimated for USACE sites on the basis of measured releases, changes in reservoir storage, a correction for evaporative losses, and an accounting of flow effects from upstream dams. For the PGE dam, no-project streamflows were derived from a previous modeling effort that was part of a dam-relicensing process. Without-dam streamflows were characterized by higher peak flows in winter and spring and much lower flows in late summer, as compared to with-dam measured flows. Without-dam water temperatures were estimated from measured temperatures upstream of the reservoirs (the USACE sites) or derived from no-project model results (the PGE site). When using upstream data to estimate without-dam temperatures at dam sites, a typical downstream warming rate based on historical data and downstream river models was applied over the distance from the measurement point to the dam site, but only for conditions when the temperature data indicated that warming might be expected. Regressions with measured temperatures from nearby or similar sites were used to extend the without-dam temperature estimates to the entire 2001-02 time period. Without-dam temperature estimates were characterized by a more natural seasonal pattern, with a maximum in July or August, in contrast to the measured patterns at many of the tall dam sites

  16. The Political Ecology of Chinese Large Dams in Cambodia: Implications, Challenges and Lessons Learnt from the Kamchay Dam

    Directory of Open Access Journals (Sweden)

    Giuseppina Siciliano

    2016-09-01

    Full Text Available Given the opportunities offered by foreign investment in energy infrastructure mostly by Chinese firms, the Government of Cambodia is giving high priority to developing hydropower resources for reducing energy poverty and powering economic growth. Using a “Political ecology of the Asian drivers” framework, this paper assesses China’s involvement in the development of large dams’ in Cambodia and its impacts on the access of natural resources such as water and energy by dam builders, local communities and the government. This analysis is based on 61 interviews and 10 focus group discussions with affected communities, institutional actors, Chinese dam builders and financiers in relation to the first large Chinese dam built in Cambodia: the Kamchay dam. Based on the results of the analysis this paper makes recommendations on how to improve the planning, implementation and governance of future large dams in Cambodia.

  17. Douglas County Dam Breach Inundation Areas

    Data.gov (United States)

    Kansas Data Access and Support Center — Dam breach analysis provides a prediction of the extent and timing of flooding from a catastrophic breach of the dams. These results are sufficient for developing...

  18. Expectations of immortality: dam safety management into the next millennium

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, M.D. [Tonkin and Taylor International Ltd., Auckland, (New Zealand)

    1999-07-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs.

  19. Expectations of immortality: dam safety management into the next millennium

    International Nuclear Information System (INIS)

    Palmer, M.D.

    1999-01-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs

  20. Dilemmas of energy efficient urban development in three Nordic cities

    DEFF Research Database (Denmark)

    Große, Juliane; Fertner, Christian; Groth, Niels Boje

    Energy is high on the agenda of the European Union and in current urban development. In this study we focus on the role of urban planning in energy efficiency in 3 Northern European cities - Turku (FI), Eskilstuna (SE) and Tartu (EE). The case studies were developed in close collaboration between...... the authors and representatives of the cities. The research was carried out by field trips, interviews and analysis of local reports and planning documents. This work was done in the framework of the EU-FP7 project PLEEC (Planning for energy efficient cities), GA no. 314704, www.pleecproject.eu...

  1. Langbjorn dam : adaptation for safe discharge of extreme floods

    Energy Technology Data Exchange (ETDEWEB)

    Yang, J. [Vattenfall Research and Development, Alvkarleby (Sweden); Ericsson, H.; Gustafsson, A. [SWECO, Stockholm (Sweden); Stenmark, M. [Vattenfall Power Consultant, Ludvika (Sweden); Mikaelsson, J. [Vattenfall Nordic Generation, Bispgarden (Sweden)

    2007-07-01

    The Langbjorn hydropower scheme, composed of an embankment dam with an impervious core of compacted moraine, a spillway section and a powerhouse, is located on the Angermanalven River in north Sweden. The scheme was commissioned in 1959 and is owned by Vattenfall. As part of its dam safety program, Vattenfall plans to adapt and refurbish many of its dams to the updated design-flood and dam-safety guidelines. Langbjorn is classified as a high hazard dam, as its updated design flood is 30 per cent higher than the existing spillway capacity. Safety evaluations were conducted for the Langbjorn dam, and, as required by the higher safety standard, there was a need to rebuild the dam, so that the design flood could be safely released without causing failure of the dam. This paper provided information on the Langbjorn hydropower scheme and discussed the planned rebuilding measures. For example, the design flood was accommodated by allowing a temporary raise of the water level by 1.3 metres above the legal retention reservoir level, which required heightening and reinforcement of the dam. Specifically, the paper discussed measures to increase the discharge capacity; handling and control of floating debris; improvement and heightening of impervious core in left and right connecting dam and abutment; measures to increase the stability of the left steep riverbank; and measures to increase stability of the spillway monoliths and the left guide wall. In addition, the paper discussed measures to ensure stability of the downstream stretch of the river bank and increase instrumentation. The paper also presented the results of hydraulic investigations to investigate the risk of erosion downstream of the dam. It was concluded that the dam could discharge the design flood and that the stability of the dam was improved and judged to be satisfactory during all foreseeable conditions. 2 refs., 8 figs.

  2. The mathematics of dam safety

    Energy Technology Data Exchange (ETDEWEB)

    Widmann, R. [Osterreichische Gesellschaft fuer Geomechanik, Salzburg (Austria)

    1997-05-01

    The safety of a dam is determined by its design, construction and supervision during operation. High arch dam failures have dropped dramatically since the early part of this century. An essential part of the success story relates to improved measurement techniques that can detect earlier unexpected behaviour that may lead to failure. (UK)

  3. Automatic dam concrete placing system; Dam concrete dasetsu sagyo no jidoka system

    Energy Technology Data Exchange (ETDEWEB)

    Yoneda, Y; Hori, Y; Nakayama, T; Yoshihara, K; Hironaka, T [Okumura Corp., Osaka (Japan)

    1994-11-15

    An automatic concrete placing system was developed for concrete dam construction. This system consists of the following five subsystems: a wireless data transmission system, an automatic dam concrete mixing system, a consistency determination system, an automatic dam concrete loading and transporting system, and a remote concrete bucket opening and closing system. The system includes the following features: mixing amount by mixing ratio and mixing intervals can be instructed from a concrete placing site by using a wireless handy terminal; concrete is mixed automatically in a batcher plant; a transfer car is started, and concrete is charged into a bucket automatically; the mixed concrete is determined of its properties automatically; labor cost can be reduced, the work efficiency improved, and the safety enhanced; and the system introduction has resulted in unattended operation from the aggregate draw-out to a bunker line, manpower saving of five persons, and reduction in cycle time by 10%. 11 figs., 2 tabs.

  4. Trade union revitalisation

    DEFF Research Database (Denmark)

    Ibsen, Christian Lyhne; Tapia, Maite

    2017-01-01

    In this article, we review and assess research on the role of trade unions in labour markets and society, the current decline of unions and union revitalisation. The review shows three main trends. First, trade unions are converging into similar strategies of revitalisation. The ‘organising model...... their traditional strongholds of collective bargaining and corporatist policy-making. Second, research has shown that used strategies are not a panacea for success for unions in countries that pearheaded revitalisation. This finding points to the importance of supportive institutional frameworks if unions...... in adverse institutional contexts, can be effective when they reinvent their repertoires of contention, through political action or campaigning along global value chains....

  5. Dam safety investigations of the concrete structures of Hugh Keenleyside dam

    International Nuclear Information System (INIS)

    Hanna, A.W.; Nunn, J.O.H.; Cornish, L.; Northcott, P.

    1993-01-01

    The Hugh Keenleyside dam is located on the Columbia River in southeastern British Columbia, and impounds Arrow Lakes Reservoir which has a live storage of 8.8 km 3 and drains an area of 36,000 km 2 . It consists of a number of concrete structures, with a total length of 360 m and a maximum height of 58 m, and an earthfill embankment which spans across the original river channel. The 450 m long zoned earthfill dam is founded on pervious alluvium over 150 m deep. It has a sloping impervious core constructed from glacial till which extends 670 m upstream of the dam. This impervious blanket extends over the full width of the reservoir and is connected to the upstream face of the concrete structures. The results of a dam safety study, which was carried out due to the presence of high uplift pressures at some parts of the foundation, and stability concerns, are presented. The investigation concluded that the high uplift pressures were due to a localized defect in the upstream blanket and did not indicate any general deterioration of the blanket. Techniques that were found to be of particular use in the study for defining the source and nature of the foundation defects were: temperature surveys of flows from piezometers, cells and drains; air injection tests; and pressure response testing of cells, piezometers and drains to establish foundation interconnections. The concrete structures met the stability criteria for all load cases considered except for the navigation lock and the low level outlets. 3 refs., 6 figs

  6. Computational Aspects of Dam Risk Analysis: Findings and Challenges

    Directory of Open Access Journals (Sweden)

    Ignacio Escuder-Bueno

    2016-09-01

    Full Text Available In recent years, risk analysis techniques have proved to be a useful tool to inform dam safety management. This paper summarizes the outcomes of three themes related to dam risk analysis discussed in the Benchmark Workshops organized by the International Commission on Large Dams Technical Committee on “Computational Aspects of Analysis and Design of Dams.” In the 2011 Benchmark Workshop, estimation of the probability of failure of a gravity dam for the sliding failure mode was discussed. Next, in 2013, the discussion focused on the computational challenges of the estimation of consequences in dam risk analysis. Finally, in 2015, the probability of sliding and overtopping in an embankment was analyzed. These Benchmark Workshops have allowed a complete review of numerical aspects for dam risk analysis, showing that risk analysis methods are a very useful tool to analyze the risk of dam systems, including downstream consequence assessments and the uncertainty of structural models.

  7. On the response of large dams to incoherent seismic excitation

    International Nuclear Information System (INIS)

    Ramadan, O.; Novak, M.

    1993-01-01

    An intensive parametric study was conducted to investigate the response of concrete gravity dams to horizontal, spatially variable seismic ground motions. Both segmented dams consisting of separate blocks, or monoliths, and continuous monolithic dams are considered. The study includes the effects of various parameters on system natural frequencies, vibration modes, modal displacement ratios, as well as dam displacements and internal stresses due to spatially variable ground motions. The dam analytical model, and dam response to incoherent ground motions are described. The results show that the dam vibrates almost as a rigid body under the fully correlated waves, but bends and twists significantly under the spatially correlated motions. Dam-foundation interaction magnifies the low frequency components of the dam response, more so for a full reservoir, but decreases the high frequency components. For long dams, the effects of spatially incoherent ground motions are qualitatively different and can be much greater than those due to surface travelling waves. 3 refs., 3 figs

  8. the effect of age of dam on weaning mass for ftve dam breed types

    African Journals Online (AJOL)

    SUMMARY: The effect of age of dam on adjusted 210 day calf weaning mass was estimated by the Least Squares method for 5 dam types on 2 farms. ... the later maturing breeds would have a low level of productivity because these cows would be eliminated in their potentially prime .... time at 28 (2A) or 3l (28) months old.

  9. Proceeding of the public safety around dams conference

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Canadian Dam Association hosted the Public Safety Around Dams workshop in which presentations were given in the morning to describe the different measures and methods implemented by the Ontario Ministry of Natural Resources, Ontario Power Generation and others to improve safety around dams. In the afternoon, the participants toured the Auburn and Lakefield dams and facilities to view the infrastructures and equipment. A roundtable discussion concluded the day. Following this workshop, a Public Safety Around Dams group was created on the social network site, LinkedIn. This conference featured 6 presentations, 3 of which have been catalogued separately for inclusion in this database.

  10. Major dams of the United States, Geographic NAD83, USGS (2006) [dams00x020_USGS_2006

    Data.gov (United States)

    Louisiana Geographic Information Center — This map layer portrays major dams of the United States, including Puerto Rico and the U.S. Virgin Islands. The map layer was created by extracting dams 50 feet or...

  11. Geodetic deformation monitoring at Pendidikan Diponegoro Dam

    Science.gov (United States)

    Yuwono, Bambang Darmo; Awaluddin, Moehammad; Yusuf, M. A.; Fadillah, Rizki

    2017-07-01

    Deformation monitoring is one indicator to assess the feasibility of Dam. In order to get the correct result of the deformation, it is necessary to determine appropriate deformation monitoring network and the observation data should be analyse and evaluated carefully. Measurement and analysis of deformation requires relatively accurate data and the precision is high enough, one of the observation method that used is GPS (Global Positioning System). The research was conducted at Pendidikan Undip Dams is Dam which is located in Tembang. Diponegoro Dam was built in 2013 and a volume of 50.86 m3 of water, inundation normal width of up to 13,500 m2. The main purpose of these building is not only for drainage but also for education and micro hydro power plant etc. The main goal of this reasearch was to monitor and analyze the deformation at Pendidikan Undip Dam and to determaine whether GPS measurement could meet accuracy requirement for dam deformation measurements. Measurements were made 2 times over 2 years, 2015 and 2016 using dual frequency GPS receivers with static methods and processed by Scientific Software GAMIT 10.6

  12. Investigating leaks in dams and reservoirs

    International Nuclear Information System (INIS)

    2003-01-01

    Millions of people throughout the world depend on dams and reservoirs for electricity, water and flood protection. Dams require significant investment to build and maintain, and yet their usefulness and integrity are constantly threatened by leakage and sedimentation. Isotope hydrology techniques, combined with conventional analytical methods, are a cost-effective tool to reduce such threats. The International Atomic Energy Agency is promoting their use to protect these investments and improve management, particularly by supporting specialized teams of scientists and engineers to investigate dam leakage in African countries on request. (IAEA)

  13. A study on the effect of a broken large sabo dam on the sediment transportation in channel - an example of Baling-sabo-dam

    Science.gov (United States)

    Tseng, W. H.; Shieh, C. L.; Lee, S. P.; Tsang, Y. C.

    2009-04-01

    To retard the sediment transportation and its effect on the reservoir, large sabo dams are built in the main channel of the reservoir watershed in Taiwan. Therefore, these large sabo dams affect upstream, downstream, and the reservoir significantly if the dam breaks. There was about 450 mm of rain fell in the reservoir watershed during typhoon Wipha that struck Taiwan on 17-19, September, 2007. This heavy rainfall caused the Baling-sabo-dam broken about 60 m of the upper Dahan Creek in the Shimen Reservoir watershed. The dam, built in 1977, is 38 m in height, 80 m in width, and is designed to reserve sediment materials about 10 million m3. The upper river bed was diminished maximum to 20 m in a month; the deposited and affected areas are unable to estimate and still required to be observed. The main purpose of this paper is to analyze the topographic characteristic of the channel after the dam broke according to the topographic and surveyed data before and after the dam broke. The longitudinal profile and the cross section data show the effects to the channel after the dam break and the channel is able to classify in several sections. A simple comparison of the sediment discharge estimated from the hydrologic data with the topographic survey data is also analyzed. Keywords:dam break, sabo dam, sediment discharge

  14. The Grand Ethiopian Renaissance Dam and Ethiopia's Succession ...

    African Journals Online (AJOL)

    Tadesse Kassa Woldetsadik

    2013-06-01

    Jun 1, 2013 ... Dam concessions engendered detrimental impacts on Ethiopia's riparian rights ... control works on the Aswan High and the Roseires dams. Disturbed by the ... hegemonic control that would inevitably ensue from construction of the Dam ...... Projects Implementation Division AAAID, Sudan, p.1. 39 Ibid.

  15. Dam failure analysis/calibration using NWS models on dam failure in Alton, New Hampshire

    International Nuclear Information System (INIS)

    Capone, E.J.

    1998-01-01

    The State of New Hampshire Water Resources Board, the United States Geological Service, and private concerns have compiled data on the cause of a catastrophic failure of the Bergeron Dam in Alton, New Hampshire in March of 1996. Data collected related to the cause of the breach, the breach parameters, the soil characteristics of the failed section, and the limits of downstream flooding. Dam break modeling software was used to calibrate and verify the simulated flood-wave caused by the Bergeron Dam breach. Several scenarios were modeled, using different degrees of detail concerning the topography/channel-geometry of the affected areas. A sensitivity analysis of the important output parameters was completed. The relative importance of model parameters on the results was assessed against the background of observed historical events

  16. STABILITAS CHECK DAM DI ARBORETUM DESA SUMBER BRANTAS

    Directory of Open Access Journals (Sweden)

    Endang Purwati

    2012-09-01

    Full Text Available Abstract: The stability of check-dam in arboretum of Sumber Brantas village. Sumber Brantas water sources area is arboretum territory which has to be maintained as conservation either for technical or vegetation (plants cover by sustainable development. Arboretum territory is made as asylum in irrigation system district of Brantas River. This research discusses technical conservation activity to build the check dam in conserving the area. Check dam is built dimensionally by using HEC-RAS Program to get safe and stable dimension for rolling, shifting and piping of Sf > 1.5, and based on hydrologic analysis to get maximum flood discharge of 48.01 m3second-1. Hydraulic analysis is used to get water level profile and pressure for the dam body. Stability of the structure will be controlled by construction load (weight of check dam and its fully sediment storage condition. The result of this research shows that the safe and stable dimension for check dam are as follows: 28 meter of width; 3 meter of main height; 1.5 meter of sub-height; 10 meter of stilling basin length (Main Dam–Sub Dam.

  17. The blind men meet the elephant at the dam: Alternative spatial and taxonomic components reveal different insights about how low-head dams impact fish biodiversity

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Smith, Joseph M.; Hitchman, Sean M.

    2017-01-01

    Dams are ubiquitous environmental impacts that threaten aquatic ecosystems. The ability to compare across research studies is essential to conserve the native biodiversity that is impacted by the millions of low‐head dams that currently fragment streams and rivers. Here, we identify a previously unaddressed obstacle that impedes this generalization. Specifically, divergent spatial and taxonomic approaches that result from different conceptualizations of the dam‐biodiversity problem can produce conflicting science‐based conclusions about the same dam impact. In this research, using the same dammed and undammed sites, we evaluated the scientific generality of different conceptualizations of the dam‐biodiversity problem. We compared two different but commonly used spatial approaches—(1) above dam–below dam vs. (2) undammed–dammed comparisons—and 11 different, commonly used taxonomic approaches (three assemblage summaries, eight guilds). Sites above the dam structure had less diverse fish assemblages than sites below dams, whereas sites below the dam structure were similar to undammed sites. Thus, spatial approach 1 detected a large dam effect and spatial approach 2 detected a small dam effect. Similarly, some taxonomic responses (species richness, diversity, abundance, and number of guilds) detected large dam effects; other responses detected small (riffle specialist guild) or no dam effects (pool generalists). In summary, our results showed that how the problem was framed altered scientific conclusions and created different dam realities. The metaphor of how individual blind men disagree about the structure of an elephant, based on examinations of different body parts, reinforces the need for a coordinated, holistic perspective on dam research. Although no single approach is adequate for all problems, identifying the form, consequences of, and relationships among different research conceptualizations will set the stage for future syntheses of dam

  18. Seismic response of uplifting concrete gravity dams

    International Nuclear Information System (INIS)

    Leger, P.; Sauve, G.; Bhattacharjee, S.

    1992-01-01

    The foundation interaction effects on the seismic response of dam-foundation systems have generally been studied using the linear elastic finite element models. In reality, the foundation can not develop effective tensile stresses to a significant degree along the interface. A two-dimensional finite element model, in which nonlinear gap elements are used at the dam-foundation interface to determine the uplift response of concrete gravity dams subjected to seismic loads, is presented. Time domain analyses were performed for a wide range of modelling assumptions such as dam height, interface uplift pressure, interface mesh density, and earthquake input motions, that were systematically varied to find their influence on the seismic response. The nonlinear interface behavior generally reduces the seismic response of dam-foundation systems acting as a seismic isolation mechanism, and may increase the safety against sliding by reducing the base shear transmitted to the foundation. 4 refs., 5 figs., 6 tabs

  19. Social Justice Teacher Activism and Social Movement Unionism: Tensions, Synergies, and Space

    Directory of Open Access Journals (Sweden)

    Lois Weiner

    2013-10-01

    Full Text Available Though the titles and acronyms of policies differ from one country to another, throughout the world a political project has taken root with the assumption that to reduce poverty and inequality, governments should privatize school systems, alter teaching from a career to contract labor, use standardized tests to make students and teachers accountable, and curtail the power and legal rights of teachers unions. This article explores how teacher activists might help reverse neoliberal educational politics by developing mutually-respectful collaborations among teachers, parents and youth in poor communities, in school-based and system-wide partnerships that involve teachers unions. Analyzing events as they were experienced and influenced by a New York City-based NGO of teachers committed to educational justice, the author examines the landscape of educational reform politics and the creation of new spaces and organizational forms not confined by collective bargaining jurisdictions and traditional bargaining demands. The study suggests that development of a social movement of teachers that might edge teachers unions in the direction of social movement teacher unionism may not occur in a linear fashion. Rather, a complex push-pull dynamic occurs with each change, opening and retracting space, remaking networks and influencing longstanding personal ties among activists.

  20. Seismic performance assessment of latyan concrete buttress dam ...

    African Journals Online (AJOL)

    In order to design earthquake resistant dams and evaluate the safety of existing dams that will be exposed to future earthquakes, it is essential to have accurate and reliable analysis procedures to predict the stresses and deformations in dams subjected to earthquake ground motion. For a damwater- foundation system, the ...

  1. Walden North Dam overtopping : emergency response and rehabilitation

    Energy Technology Data Exchange (ETDEWEB)

    Dyer, S. [FortisBC Inc., South Slocan, BC (Canada); McCreanor, J. [Acres International Ltd., Calgary, AB (Canada); Cronin, D.L.R.; Daw, D. [Acres International Ltd., Vancouver, BC (Canada)

    2004-09-01

    This paper described the events that led to the overtopping of the Walden North Dam during a heavy rainfall in June 2002, resulting in a breach around an abutment wall. The dam is part of a run-of-river hydro development on Cayoosh Creek near Lillooet, British Columbia. The Walden North Dam was a low, 46 meter wide concrete dam with a single radial gate. The dam overtopping was attributed to failure of the radial gate hoist. Prior to this event, the dam had been classified by the British Columbia Dam Safety Authorities as a high and then a low consequence category of failure. As facility managers, Aquila Networks Canada Ltd. established an immediate action plan to stabilize the situation and resume normal power production by applying the following priorities: (1) ensure safety of workers and the public, (2) limit further damage to the dam and other facilities, (3) ensure environmental protection, and (4) continue to operate the generation units. Local authorities were informed to evacuate a downstream campsite and environmental agencies were contacted along with safety regulators. Repairs included demolition of the damaged portion of the structure and construction a new two-bay gate/stoplog spillway and bridge. Construction was completed by September 2003 according to the requirements of the Department of Fisheries and Oceans for minimum flow, accurate control of fish flows and environmental monitoring of the stream area. 10 figs.

  2. Developing an integrated dam safety program

    International Nuclear Information System (INIS)

    Nielsen, N. M.; Lampa, J.

    1996-01-01

    An effort has been made to demonstrate that dam safety is an integral part of asset management which, when properly done, ensures that all objectives relating to safety and compliance, profitability, stakeholders' expectations and customer satisfaction, are achieved. The means to achieving this integration of the dam safety program and the level of effort required for each core function have been identified using the risk management approach to pinpoint vulnerabilities, and subsequently to focus priorities. The process is considered appropriate for any combination of numbers, sizes and uses of dams, and is designed to prevent exposure to unacceptable risks. 5 refs., 1 tab

  3. Thermal monitoring of leakage through Karkheh embankment dam, Iran

    Energy Technology Data Exchange (ETDEWEB)

    Mirghasemi, A.A.; Bagheri, S.M. [Tehran Univ., Tehran (Iran, Islamic Republic of). Dept. of Civil Engineering; Heidarzadeh, M. [Tehran Univ., Tehran (Iran, Islamic Republic of). Dept. of Civil Engineering]|[Mahab Ghodss Consulting Engineers, Tehran (Iran, Islamic Republic of)

    2007-07-01

    A newly developed and simple method for monitoring seepage in embankment dams was presented. The method of temperature measurement is based on the fact that a change in permeability results in a change in seepage flow, thereby causing a temperature change that can be readily measured in the dam body and foundation. In this study, water leaking through the Karkheh embankment dam was thermally analyzed to determine a pattern and amount of water seepage. With nearly 33 million cubic metres of fill, the Karkheh earth and rock-fill dam is the largest dam in Iran. Construction was completed in 2000. The thermal processes in the embankment were studied due to the dam's complex thermo-hydraulic behaviour. Thermal data was collected and analyzed during construction and operation of the dam. This paper presented the temperature variations for the different dam zones, including core, upstream shell, downstream shell, upstream filter, downstream filter and the plastic concrete cut-off wall. It was determined that the clay core works very well as an impermeable curtain. It was also shown that temperature variations of the Karkheh reservoir water is seasonal, and decrease as water depth increases. The reservoir water temperature remains constant beyond depths of 60 metres. The thermal behaviour of the core is not similar to that of the reservoir, indicating a very low value of seepage through the core. The pattern of temperature variations in the upstream shell in the left abutment is harmonic, while in the right abutment it is not harmonic. A harmonic pattern of temperature variation exists in some aquifers of the dam foundation, indicating high seepage through these aquifers. The Karkheh dam cut-off wall performs satisfactorily. It was determined that one dimensional equations for estimating seepage cannot be applied for the Karkheh dam. 17 refs., 11 figs.

  4. THE DEVELOPMENT OF LEGAL RESPONSIBILITY FOR A SOCIALLY RESPONSIBLE BEHAVIOR FOR BUSINESS OPERATORS IN ROMANIA, MEMBER STATE OF EUROPEAN UNION

    Directory of Open Access Journals (Sweden)

    Laura MURESAN

    2016-03-01

    Full Text Available Legal responsibility represents an important component of social responsibility, together with ethical responsibility, ecological responsibility, economical responsibility and philanthropic responsibility. The integration of social responsibility into the activity of business operators in the Member states of European Union is pursued at European Union level. The article analyses the opinion of the Brasov city citizens, in the framework of a marketing research performed in 2015, as regards the possibility that legal instruments should influence a socially responsible behavior for public or private business operators. The aspects analysed for business operators in Romania can represent a model for other European Union states as well.

  5. Grouting Applications in Cindere Dam

    Directory of Open Access Journals (Sweden)

    Devrim ALKAYA

    2011-01-01

    Full Text Available Grouting is one of the most popular method to control the water leakage in fill dam constructions. With this regard this method is widely used in all the world. Geological and geotechnical properties of rock are important parameters affect the design of grouting. In this study, geotechnical properties of Cindere Dam's base rock and the grouting prosedure have been investigated with grouting pressure.

  6. Sinkhole investigated at B.C. Hydro's Bennett Dam

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro's W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig

  7. Plugs or flood-makers? the unstable landslide dams of eastern Oregon

    Science.gov (United States)

    Safran, Elizabeth B.; O'Connor, Jim E.; Ely, Lisa L.; House, P. Kyle; Grant, Gordon E.; Harrity, Kelsey; Croall, Kelsey; Jones, Emily

    2015-01-01

    Landslides into valley bottoms can affect longitudinal profiles of rivers, thereby influencing landscape evolution through base-level changes. Large landslides can hinder river incision by temporarily damming rivers, but catastrophic failure of landslide dams may generate large floods that could promote incision. Dam stability therefore strongly modulates the effects of landslide dams and might be expected to vary among geologic settings. Here, we investigate the morphometry, stability, and effects on adjacent channel profiles of 17 former and current landslide dams in eastern Oregon. Data on landslide dam dimensions, former impoundment size, and longitudinal profile form were obtained from digital elevation data constrained by field observations and aerial imagery; while evidence for catastrophic dam breaching was assessed in the field. The dry, primarily extensional terrain of low-gradient volcanic tablelands and basins contrasts with the tectonically active, mountainous landscapes more commonly associated with large landslides. All but one of the eastern Oregon landslide dams are ancient (likely of order 103 to 104 years old), and all but one has been breached. The portions of the Oregon landslide dams blocking channels are small relative to the area of their source landslide complexes (0.4–33.6 km2). The multipronged landslides in eastern Oregon produce marginally smaller volume dams but affect much larger channels and impound more water than do landslide dams in mountainous settings. As a result, at least 14 of the 17 (82%) large landslide dams in our study area appear to have failed cataclysmically, producing large downstream floods now marked by boulder outwash, compared to a 40–70% failure rate for landslide dams in steep mountain environments. Morphometric indices of landslide dam stability calibrated in other environments were applied to the Oregon dams. Threshold values of the Blockage and Dimensionless Blockage Indices calibrated to worldwide

  8. The geomorphic legacy of small dams — An Austrian study

    NARCIS (Netherlands)

    Poeppl, R.E.; Keesstra, S.D.; Hein, T.

    2015-01-01

    Dams represent one of the most dominant forms of human impact upon fluvial systems during the Anthropocene, as they disrupt the downstream transfer of water and sediments. Removing dams restores river continuity and channel morphology. Both dam construction and dam removal induce geomorphic channel

  9. Job satisfaction and employee’s unionization decision: the mediating effect of perceived union instrumentality

    Energy Technology Data Exchange (ETDEWEB)

    Shan, H.; Hu, E.; Zhi, L.; Zhang, L.; Zhang, M.

    2016-07-01

    Purpose: Given the current lack of literature in the background of China labor force, this study aims to investigate the relationships among job satisfaction, perceived union instrumentality, and unionization from a reference-frame-based perspective and explore the referred relationships in the context of Chinese labor market. Design/methodology/approach: The study introduces perceived union instrumentality as a mediator to the relationship between job satisfaction and unionization. The applicability of western theories was tested in the Chinese context by a questionnaire survey on 390 employees who were working in private sectors of Jiangsu Province in China. Four hypothesis were proposed and tested by data analysis to verify the model. Findings: The study found that most aspects of job satisfaction were negatively correlated with unionization and perceived union instrumentality, while perceived union instrumentality had a positive relationship with unionization. Perceived union instrumentality was also found to have a mediating effect on the relationship between job satisfaction and unionization. Originality/value: The paper adapted and tested a number of western industrial relation theories in the backdrop of China, contributing to the gap in Chinese-context research by examining the relationships between job satisfaction, unionization and union instrumentality of Chinese employees. It pays a regular contribution to labor union studies both inside and outside China. (Author)

  10. Estimating flood inundation caused by dam failures

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada). School of Engineering; Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-01-15

    Recent advancements in modelling inundation due to dam failures have allowed easier and more illustrative analyses of potential outcomes. This paper described new model and mapping capabilities available using the HEC-RAS hydraulic model in concert with geographic information systems (GIS). The study area was the upper reaches of Canagagigue Creek and the Woolwich Dam near Elmira, Ontario. A hydraulic analysis of a hypothetical dam failure was developed based on the summer probable maximum flood (PMF) event. Limits extended from Woolwich Dam to downstream of the Town of Elmira. An incoming summer PMF hydrograph was set as the upstream boundary condition in the upstream model. Simulation parameters include simulation time-step; implicit weighting factor; water surface calculation tolerance; and output calculation interval. Peak flows were presented, as well as corresponding flood inundation results through the Town of Elmira. The hydraulic model results were exported to a GIS in order to develop inundation maps for emergency management planning. Results from post-processing included inundation maps for each of the simulated time-steps as well as an inundation animation for the duration of the dam breach. It was concluded that the modelling tools presented in the study can be applied to other dam safety assessment projects in order to develop effective and efficient emergency preparedness plans through public consultation and the establishment of impact zones. 1 tab., 2 figs.

  11. Dynamic analyzing procedures adopted for concrete-faced rockfill dams in Turkey

    Energy Technology Data Exchange (ETDEWEB)

    Tosun, H. [Dam Safety Association, Ankara (Turkey); Tosun, K. [TVT Hydrotech Bureau, Ankara (Turkey)

    2008-07-01

    A concrete faced rockfill dam (CFRD) has some advantages compared to other embankment types. The advantages include minimal settlement problems through the use of compacted rockfill; increased overall stability of the dam since the water pressure acts on the upstream face; and pore water pressure does not develop in the rockfill zone if it is well designed and constructed. It is thought that well-compacted CFRD has a high resistance to earthquake loading, as based on several factors including acceptable past performance of similar dams. While numerical solutions performed for this type of dams indicate that it is as safe as other embankment dams, their behavior is still questionable when they are subjected to severe seismic loading. This paper outlined the key principals of the dynamic analyzing method adopted for CFRDs in Turkey and summarized the practice of CFRDs with heights ranging from 54 to 135 metres throughout the country. Two-dimensional finite element models were executed to estimate displacements on the crest under the different loadings of earthquake. Dams that were discussed included the Kurtun Dam, the Torul Dam, the Atasu Dam, the Dim Dam, the Gordes Dam, and the Marmaris Dam. The paper also discussed the limitation about permanent settlement provided in the national dam specification and introduced the results obtained from a case study of the Pamukluk Dam located in southern Turkey. Geology and geotechnics as well as the embankment details and materials were discussed. The case study also summarized the selection of seismic parameters and dynamic analyses. 35 refs., 1 tab., 8 figs.

  12. Hydrogeophysical investigations at Hidden Dam, Raymond, California

    Science.gov (United States)

    Minsley, Burke J.; Burton, Bethany L.; Ikard, Scott; Powers, Michael H.

    2011-01-01

    Self-potential and direct current resistivity surveys are carried out at the Hidden Dam site in Raymond, California to assess present-day seepage patterns and better understand the hydrogeologic mechanisms that likely influence seepage. Numerical modeling is utilized in conjunction with the geophysical measurements to predict variably-saturated flow through typical two-dimensional dam cross-sections as a function of reservoir elevation. Several different flow scenarios are investigated based on the known hydrogeology, as well as information about typical subsurface structures gained from the resistivity survey. The flow models are also used to simulate the bulk electrical resistivity in the subsurface under varying saturation conditions, as well as the self-potential response using petrophysical relationships and electrokinetic coupling equations.The self-potential survey consists of 512 measurements on the downstream area of the dam, and corroborates known seepage areas on the northwest side of the dam. Two direct-current resistivity profiles, each approximately 2,500 ft (762 m) long, indicate a broad sediment channel under the northwest side of the dam, which may be a significant seepage pathway through the foundation. A focusing of seepage in low-topography areas downstream of the dam is confirmed from the numerical flow simulations, which is also consistent with past observations. Little evidence of seepage is identified from the self-potential data on the southeast side of the dam, also consistent with historical records, though one possible area of focused seepage is identified near the outlet works. Integration of the geophysical surveys, numerical modeling, and observation well data provides a framework for better understanding seepage at the site through a combined hydrogeophysical approach.

  13. Design and Construction of Dams, Reservoirs, and Balancing Lakes

    International Nuclear Information System (INIS)

    Lemperiere, F.

    2003-01-01

    The general data presented in sections two and three gives an idea of the extreme diversity of the millions of very large or very small dams worldwide. Dam design and construction methods for the most usual types of large dams are presented and justified in section four. The possibility and usefulness of building as many dams in the 21. century as have been built in the 20. is analyzed in section six. (author)

  14. Estimates o the risks associated with dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Ayyaswamy, P.; Hauss, B.; Hseih, T.; Moscati, A.; Hicks, T.E.; Okrent, D.

    1974-03-01

    The probabilities and potential consequences of dam failure in California, primarily due to large earthquakes, was estimated, taking as examples eleven dams having a relatively large population downstream. Mortalities in the event of dam failure range from 11,000 to 260,000, while damage to property may be as high as $720 million. It was assumed that an intensity IX or X earthquake (on the Modified Mercalli Scale) would be sufficient to completely fail earthen dams. Predictions of dam failure were based on the recurrence times of such earthquakes. For the dams studied, the recurrence intervals for an intensity IX earthquake varied between 20 and 800 years; for an intensity X between 50 and 30,000 years. For the Lake Chabot and San Pablo dams (respectively 20, 30 years recurrent earthquake times for a intensity X) the associated consequences are: 34,000 (Lake Chabot) and 30,000 (San Pablo) people killed; damage $140 million and $77 million. Evaculation was found to ameliorate the consequences slightly in most cases because of the short time available. Calculations are based on demography, and assume 10 foot floodwaters will drown all in their path and destroy all one-unit homes in the flood area. Damage estimates reflect losses incurred by structural damage to buildings and do not include loss of income. Hence the economic impact is probably understated.

  15. Dam spills and fishes

    International Nuclear Information System (INIS)

    1996-01-01

    This short paper reports the main topics discussed during the two days of the annual colloquium of the Hydro-ecology Committee of EdF. The first day was devoted to the presentation of the joint works carried out by EdF, the Paul-Sabatier University (Toulouse), the Provence St-Charles University (Marseille), the ENSAT (Toulouse) and the CEMAGREF (Lyon and Aix-en-Provence) about the environmental impact of dam spills on the aquatic flora and fauna downstream. A synthesis and recommendations were presented for the selection and characterization of future sites. The second day was devoted to the hydro-ecology study of the dam reservoir of Petit-Saut (French Guyana): water reoxygenation, quality evolution, organic matter, plankton, invertebrates and fishes. The 134 French dams concerned by water spills have been classified according to the frequency of spills, the variations of flow rates created, and their impacts on fishing, walking, irrigation, industry, drinking water, navigation, bathing. Particular studies on different sites have demonstrated the complexity of the phenomena involved concerning the impact on the ecosystems and the water quality. (J.S.)

  16. Grouting of karstic arch dam foundation

    Energy Technology Data Exchange (ETDEWEB)

    Young, J.; Rigbey, S. [Acres International, Niagara Falls, ON (Canada)

    2002-07-01

    A 200 m high arch dam and a 2000 MW underground power house complex is under development in the Middle East. The project is located in a highly seismic area in rugged, mountainous terrain. The arch dam is constructed on good quality limestone and dolomitic limestone rock mass, but it contains several zones of disturbed or sheared rock. The basement rock is slightly karstic with hydraulic conductivities in the order of 100 Lugeons. In order to get a satisfactory foundation surface for the dam, it will be necessary to excavate extensively and backfill with concrete. Because of the presence of many clay infilled cavities and fractures, geotechnicians are considering the installation of a multiple row grout curtain to a depth of 150 m below the dam foundation to ensure adequate seepage and uplift parameters when the reservoir is impounded. Initial grouting water pressure test results suggested that the grouting and drainage curtain should be extended to the left abutment beyond the current design. However, when horizontal slide models of the dam abutment were developed using the finite element program SEEPW, it was shown that there is no benefit to extending the length of grout curtains unless they are tied to an area of much lower hydraulic conductivity much deeper in the abutment. 1 tab., 5 figs.

  17. Predictions of total deformations in Jebba main dam by finite ...

    African Journals Online (AJOL)

    This paper examined the deformations of the Jebba Main Dam, Jebba Nigeria using the finite element method. The study also evaluated the predicted deformations and compared them with the actual deformations in the dam to identify possible causes of the observed longitudinal crack at the dam crest. The Jebba dam is a ...

  18. Assessment of check-dam groundwater recharge with water-balance calculations

    Science.gov (United States)

    Djuma, Hakan; Bruggeman, Adriana; Camera, Corrado; Eliades, Marinos

    2017-04-01

    Studies on the enhancement of groundwater recharge by check-dams in arid and semi-arid environments mainly focus on deriving water infiltration rates from the check-dam ponding areas. This is usually achieved by applying simple water balance models, more advanced models (e.g., two dimensional groundwater models) and field tests (e.g., infiltrometer test or soil pit tests). Recharge behind the check-dam can be affected by the built-up of sediment as a result of erosion in the upstream watershed area. This natural process can increase the uncertainty in the estimates of the recharged water volume, especially for water balance calculations. Few water balance field studies of individual check-dams have been presented in the literature and none of them presented associated uncertainties of their estimates. The objectives of this study are i) to assess the effect of a check-dam on groundwater recharge from an ephemeral river; and ii) to assess annual sedimentation at the check-dam during a 4-year period. The study was conducted on a check-dam in the semi-arid island of Cyprus. Field campaigns were carried out to measure water flow, water depth and check-dam topography in order to establish check-dam water height, volume, evaporation, outflow and recharge relations. Topographic surveys were repeated at the end of consecutive hydrological years to estimate the sediment built up in the reservoir area of the check dam. Also, sediment samples were collected from the check-dam reservoir area for bulk-density analyses. To quantify the groundwater recharge, a water balance model was applied at two locations: at the check-dam and corresponding reservoir area, and at a 4-km stretch of the river bed without check-dam. Results showed that a check-dam with a storage capacity of 25,000 m3 was able to recharge to the aquifer, in four years, a total of 12 million m3 out of the 42 million m3 of measured (or modelled) streamflow. Recharge from the analyzed 4-km long river section without

  19. Earthquake induced liquefaction analysis of Tendaho earth-fill dam ...

    African Journals Online (AJOL)

    fill dam, which is part of Tendaho Dam and Irrigation Project; the largest irrigation project in Ethiopia to date. The dam is located in the most seismic part of Ethiopia and was originally designed to be founded on potentially liquefiable alluvium ...

  20. Dams and Obstructions along Iowa's Canoe Routes

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — This dataset represents obstruction to canoe and boat users of the canoe routes of Iowa. This may represent actual dams, rock dams (natural or man made), large...

  1. Ririe Dam Release Test Assessment

    Science.gov (United States)

    2013-06-01

    Notes HEC - RAS Location Station (ft) Observation Notes 1420 Ririe Dam Ririe Dam 119,880 Gates opened and initial release started. 1455 115th St...16°F air temperature. Table A2. Observations made on 11 February 2013. Time Location Notes HEC - RAS Location Station (ft) Observation Notes...ERDC/CRREL TR-13-10 52 Time Location Notes HEC - RAS Location Station (ft) Observation Notes Travel Time* (sec) Vel.** (fps) 1224 5th

  2. Grouting design for slope stability of kedung uling earthfill dam

    Directory of Open Access Journals (Sweden)

    Najib

    2018-01-01

    Full Text Available Kedung Uling earthfill dam locates at Wonogiri Regency, Central Java, Indonesia. The dam encountered sliding and settlement at the embankment wall. To minimize sliding and settlement and to optimize the dam, both field investigation and laboratory tests have been proceeded for slope stability analysis and remedial embankment wall. Soil and rock investigation around the dam, which is followed by 10 core drillings, have been conducted. Laboratory tests such as direct shear and index properties have also been carried on. The results were further used for dam slope stability model using slide 6.0 and were used to analyzed factor of safety (FS of Kedunguling dam. 10 conditions of dam were simulated and strengthening body of dam with grouting was designed. The results showed two conditions, which are condition of maximum water level with and without earthquake at downstream, were unsatisfy Indonesia National Standard (SNI for building and infrastructure. These conditions can be managed by using grouting for increasing stabilization of embankment wall. By setting up grouting, factor of safety increases and meet the SNI standard requirement.

  3. Non uniform nature of recorded ground accelerations at dam foundation interface

    Energy Technology Data Exchange (ETDEWEB)

    Ghaemian, Mohsen; Gilani, Morteza Sohrabi [Sharif University of Technology, Tehran, (Iran, Islamic Republic of); Noorzad, Ali [Power and Water University of Technology, Tehran, (Iran, Islamic Republic of)

    2010-07-01

    The Karun III is a double curved concrete arch dam located in Iran which was used to investigate earthquake motions and dam responses. This paper presented the study of the Karun III dam foundation interface. Using an array of 15 accelerometers, two major events that occurred on 2007.11.20 and 2007.11.21 were recorded during dam operation with a PGA at crest of 0.312 g and 0.109.g respectively. A finite element model of Karun III dam was performed. The response of the Karun III dam during the 2007 earthquake was investigated using the NSAD-DRI program. It was found that the motion of the dam foundation interface is non-uniform. There is a time shift and amplification at the abutment compared to those at the base of the dam. The results showed that the spatially varying earthquake assumption is in good agreement with the recorded displacement of the dam.

  4. Verifying Pressure of Water on Dams, a Case Study

    Directory of Open Access Journals (Sweden)

    Temel Bayrak

    2008-09-01

    Full Text Available Sensing and monitoring deformation pattern of dams is often one of the most effective ways to understand their safety status. The main objective of the present study is to find the extent to which rising reservoir level affects the mechanism of deformation of the Yamula dam under certain changes in the reservoir level conditions during the first filling period. A new dynamic deformation analysis technique was developed to analyze four geodetic monitoring records consisting of vertical and horizontal displacements of nine object points established on the dam and six reference points surrounding it, to see whether the rising reservoir level is responsible for the vertical and horizontal deformations during the first filling period. The largest displacements were determined in the middle points of the dam construction. There is an apparent linear relationship between the dam subsidence and the reservoir level. The dynamic deformation model was developed to model this situation. The model infers a causative relationship between the reservoir level and the dam deformations. The analysis of the results determines the degree of the correlation between the change in the reservoir level and the observed structural deformation of the dam.

  5. Detection of water leaks in the dam Joumine and study of sedimentation in the dam Ghezela by nuclear method

    International Nuclear Information System (INIS)

    Sari Souha

    2013-01-01

    The objective of this study is to determinate the paths of leaks observed in the dam Joumine and to identify the origin of salinity in the drain D2. In addition, the evaluation of the sedimentation measurement of suspended elements in the dam Ghezela is our second objective. The Joumine dam located in the North-east of Tunisia (governorate of Bizerte), was built in 1983 has an upstream watershed area of 418 km 2 . The reservoir capacity is 130 Mm 3 . This dam observed a water leakage from its implementation at the two drains D1 and D2 with a emerging flow rate reached a value close to 500 l/s, about 16 pour cent of its capacity. The injection of an insulating material in Karsts networks reduces the leakage rate to a value of 120 l / s in 1993 and 88 l / s in 2013, but this decrease was accompanied by an increase in salinity level in D2. The results from a multidisciplinary approach showed that the leakage path from the left bank of the reservoir where the leak was first detected, heading both D1 and D2 drains and the salinity in drain D2 due to the dissolution of the gypsum layer downstream of the dam and the contribution of brackish water from the left bank. The Ghezela dam located in the same area, was built in 1984 has an upstream watershed area of 48 km 2 . This dam has been an increase in sedimentation of 0.3 million m3 in 1994 to 1.7 million m 3 in 2010. In this study, the suspended elements were measured with a nuclear probe composed by a radioactive source of americium 241 and a NaI detector trained by a boat at different depth in the reservoir.

  6. Pearl Harbor: lessons for the dam safety community

    Energy Technology Data Exchange (ETDEWEB)

    Martin, T.E. [AMEC Earth and Environmental Ltd., Burnaby, BC (Canada)

    2001-10-01

    Every good dam safety program must be based on surveillance and emergency response planning. The same principles apply to the gathering of information for military intelligence and the planning of defence tactics. Lessons learned from failure have spurred the advancement of dam engineering. Dam safety experts can benefit from the inadequacies encountered by the military community, with the most famous occurring on December 7, 1941 in Pearl Harbor. Both intelligence gathering and contingency response planning failed miserably. The data was not properly disseminated, interpreted, analysed. The proper response to the situation was not initiated. Human error and failure to communicate are the two main reasons that explain the debacle. The inquiries into the tragedy at Pearl Harbor provided valuable lessons, related to individual and organizational failures, which the authors shared in this presentation. The relevance to dam safety was made. All Federal Bureau of Investigation (FBI) agents must read the lessons drawn from Pearl Harbor, as they have responsibility for dam safety. 4 refs.

  7. Towards a dams safety management system for Angola

    OpenAIRE

    Camilo, V.; Silva, A.; Costa, R.; Barateiro, J.; Portela, E. A.; Fonseca, J.

    2015-01-01

    Dams have contributed to the human development and have brought many benefits, such as delivering hydropower, irrigating agricultural fields, supplying drinking water, or just for navigational and recreational purposes. Nevertheless, dams are critical structures that raise multiple concerns and risks associated with the ecological, social and economic impact. Angola has a rich and complex network of water basins and dams that serves different strategic purposes as defined in it...

  8. Remote Sensing of Deformation of a High Concrete-Faced Rockfill Dam Using InSAR: A Study of the Shuibuya Dam, China

    Directory of Open Access Journals (Sweden)

    Wei Zhou

    2016-03-01

    Full Text Available Settlement is one of the most important deformation characteristics of high concrete faced rockfill dams (CFRDs, >100 m. High CFRDs safety would pose a great threat to the security of people’s lives and property downstream if this kind of deformation were not to be measured correctly, as traditional monitoring approaches have limitations in terms of durability, coverage, and efficiency. It has become urgent to develop new monitoring techniques to complement or replace traditional monitoring approaches for monitoring the safety and operation status of high CFRDs. This study examines the Shuibuya Dam (up to 233.5 m in height in China, which is currently the highest CFRD in the world. We used space-borne Interferometric Synthetic Aperture Radar (InSAR time series to monitor the surface deformation of the Shuibuya Dam. Twenty-one ALOS PALSAR images that span the period from 28 February 2007 to 11 March 2011 were used to map the spatial and temporal deformation of the dam. A high correlation of 0.93 between the InSAR and the in-situ monitoring results confirmed the reliability of the InSAR method; the deformation history derived from InSAR is also consistent with the in-situ settlement monitoring system. In addition, the InSAR results allow continuous investigation of dam deformation over a wide area that includes the entire dam surface as well as the surrounding area, offering a clear picture continuously of the dam deformation.

  9. The drainage information and control system of smart city

    Science.gov (United States)

    Mao, Tonglei; Li, Lei; Liu, JiChang; Cheng, Liang; Zhang, Jing; Song, Zengzhong; Liu, Lianhai; Hu, Zichen

    2018-03-01

    At present, due to the continuous expansion of city and the increase of the municipal drainage facilities, which leads to a serious lack of management and operation personnel, the existing production management pattern already can't adapt to the new requirements. In this paper, according to river drainage management, flood control, water management, auditing, administrative license, etc. different business management requirement, an information management system for water planning and design of smart city based on WebGIS in Linyi was introduced, which can collect the various information of gate dam, water pump, bridge sensor and traffic guide terminal nodes etc. together. The practical application show that the system can not only implement the sharing, resources integration and collaborative application for the regional water information, but also improve the level of the integrated water management.

  10. Measurement of Dam Deformations: Case Study of Obruk Dam (Turkey)

    Science.gov (United States)

    Gulal, V. Engin; Alkan, R. Metin; Alkan, M. Nurullah; İlci, Veli; Ozulu, I. Murat; Tombus, F. Engin; Kose, Zafer; Aladogan, Kayhan; Sahin, Murat; Yavasoglu, Hakan; Oku, Guldane

    2016-04-01

    In the literature, there is information regarding the first deformation and displacement measurements in dams that were conducted in 1920s Switzerland. Todays, deformation measurements in the dams have gained very different functions with improvements in both measurement equipment and evaluation of measurements. Deformation measurements and analysis are among the main topics studied by scientists who take interest in the engineering measurement sciences. The Working group of Deformation Measurements and Analysis, which was established under the International Federation of Surveyors (FIG), carries out its studies and activities with regard to this subject. At the end of the 1970s, the subject of the determination of fixed points in the deformation monitoring network was one of the main subjects extensively studied. Many theories arose from this inquiry, as different institutes came to differing conclusions. In 1978, a special commission with representatives of universities has been established within the FIG 6.1 working group; this commission worked on the issue of determining a general approach to geometric deformation analysis. The results gleaned from the commission were discussed at symposiums organized by the FIG. In accordance with these studies, scientists interested in the subject have begun to work on models that investigate cause and effect relations between the effects that cause deformation and deformation. As of the scientist who interest with the issue focused on different deformation methods, another special commission was established within the FIG engineering measurements commission in order to classify deformation models and study terminology. After studying this material for a long time, the official commission report was published in 2001. In this prepared report, studies have been carried out by considering the FIG Engineering Surveying Commission's report entitled, 'MODELS AND TERMINOLOGY FOR THE ANALYSIS OF GEODETIC MONITORING OBSERVATIONS

  11. National Program for Inspection of Non-Federal Dams. Miller Pond Dam (CT 00154), Thames River Basin, Waterford, Connecticut. Phase I Inspection Report.

    Science.gov (United States)

    1980-08-01

    Road and adjacent to the Brook are likely to be impacted by dam failure. Because a breach of Miller Pond Dam would cause severe economic loss and the...TO THE ASSUMED SPILL CREST ELEVATION 3 WATER %. WACE ELEATCRS. SHOREI I NE AND 7AI NGTER COGRATIONS ARE APPROXIMATE, AS OBTAINED Dl"F I -t DAM INSECTION

  12. Seismic Analysis of Concrete Dam by Using Finite Element Method

    Directory of Open Access Journals (Sweden)

    Rozaina Ismail

    2017-01-01

    Full Text Available This paper reports a brief study on linear seismic analysis of Sg. Kinta Concrete Dam. The analysis was conducted in order to determine the performance and behaviour of the dam under seismic excitation. The dam was modelled as two-dimensional and developed based on the design drawing that is obtained from Angkasa Consulting Services Sdn. Bhd. The seismic analysis of the dam is conducted using finite element analysis software package LUSAS 14.3 and the dam has been analyse as a plain stress problem with a linear consideration. A set of historic data, with E1 Centro earthquake acceleration of about 0.50g is used as an earthquake excitation. The natural frequency and mode shape up to fifth mode of the dam has been obtained from the analysis to show the differences of the stress and deformation between each mode. The maximum horizontal and vertical stress of Sg. Kinta dam was found and the distribution of them was discussed in form of contours. The deformation of the dam were also been discussed by comparing the maximum displacement for each mode shaped.

  13. The Performance of the Smart Cities in China—A Comparative Study by Means of Self-Organizing Maps and Social Networks Analysis

    OpenAIRE

    Dong Lu; Ye Tian; Vincent Y. Liu; Yi Zhang

    2015-01-01

    Smart cities link the city services, citizens, resource and infrastructures together and form the heart of the modern society. As a “smart” ecosystem, smart cities focus on sustainable growth, efficiency, productivity and environmentally friendly development. By comparing with the European Union, North America and other countries, smart cities in China are still in the preliminary stage. This study offers a comparative analysis of ten smart cities in China on the basis of an extensive databas...

  14. Alteration of stream temperature by natural and artificial beaver dams.

    Science.gov (United States)

    Weber, Nicholas; Bouwes, Nicolaas; Pollock, Michael M; Volk, Carol; Wheaton, Joseph M; Wathen, Gus; Wirtz, Jacob; Jordan, Chris E

    2017-01-01

    Beaver are an integral component of hydrologic, geomorphic, and biotic processes within North American stream systems, and their propensity to build dams alters stream and riparian structure and function to the benefit of many aquatic and terrestrial species. Recognizing this, beaver relocation efforts and/or application of structures designed to mimic the function of beaver dams are increasingly being utilized as effective and cost-efficient stream and riparian restoration approaches. Despite these verities, the notion that beaver dams negatively impact stream habitat remains common, specifically the assumption that beaver dams increase stream temperatures during summer to the detriment of sensitive biota such as salmonids. In this study, we tracked beaver dam distributions and monitored water temperature throughout 34 km of stream for an eight-year period between 2007 and 2014. During this time the number of natural beaver dams within the study area increased by an order of magnitude, and an additional 4 km of stream were subject to a restoration manipulation that included installing a high-density of Beaver Dam Analog (BDA) structures designed to mimic the function of natural beaver dams. Our observations reveal several mechanisms by which beaver dam development may influence stream temperature regimes; including longitudinal buffering of diel summer temperature extrema at the reach scale due to increased surface water storage, and creation of cool-water channel scale temperature refugia through enhanced groundwater-surface water connectivity. Our results suggest that creation of natural and/or artificial beaver dams could be used to mitigate the impact of human induced thermal degradation that may threaten sensitive species.

  15. National Program for Inspection of Non-Federal Dams. Tihonet Pond Number 2 Dam (MA 00030), Massachusetts Coastal Basin, Wareham, Massachusetts. Phase I Inspection Report.

    Science.gov (United States)

    1981-07-01

    drainage area above the dam is 8.1 square miles. The watershed is characterized by irregular topography: cranberry bogs, small ponds and depressions ...and recreational purposes. Water from this pond is used in the U irrigation of cranberry bogs downstream. The maximum storage capacity of the dam is...295-1000 g. PURPOSE OF DAM The dam impounds Tihonet Pond which is a storage reservoir 4_- 4 4: . * used principally for irrigating cranberry bogs which

  16. National Program for Inspection of Non-Federal Dams. Paper Mill Pond Dam (CT 00621), Connecticut River Basin, Vernon, Connecticut. Phase I Inspection Report.

    Science.gov (United States)

    1981-03-01

    HYDROLOGIC AND HYDRAULIC COMPUTATIONS E INFORMATION AS CONTAINED IN THE NATIONAL INVENTORY OF DAMS ,v ’walL.it, AM I OVERVIEV \\ PHOTO Iv 390 L-( ibb~ ~5~4 N...AS-A144 539 NATIONAL PROGRAM FOR INSPEGTION 0F NON-FEDERAL DAMS / PAPER MIL POND DAM (.(U CORPS OF ENGINEERS WALTHAM A S MA NEW ENGLANA DIV MAR...CATALOG NUMBER CT 00621A 4 TITLE (amdSubtile) S. TYPE OF REPORT & PERIOD’COVERED Paper Mill Pond Dam INSPECTION REPORT NATIONAL PROGRAM FOR INSPECTION

  17. Hydraulic fracture considerations in oil sand overburden dams

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, R.; Madden, B.; Danku, M. [Syncrude Canada Ltd., Fort McMurray, AB (Canada)

    2008-07-01

    This paper discussed hydraulic fracture potential in the dry-filled temporary dams used in the oil sands industry. Hydraulic fractures can occur when reservoir fluid pressures are greater than the minimum stresses in a dam. Stress and strain conditions are influenced by pore pressures, levels of compaction in adjacent fills as well as by underlying pit floor and abutment conditions. Propagation pressure and crack initiation pressures must also be considered in order to provide improved hydraulic fracture protection to dams. Hydraulic fractures typically result in piping failures. Three cases of hydraulic fracture at oil sands operations in Alberta were presented. The study showed that hydraulic fracture failure modes must be considered in dam designs, particularly when thin compacted lift of dry fill are used to replace wetted clay cores. The risk of hydraulic fractures can be reduced by eliminating in situ bedrock irregularities and abutments. Overpressure heights, abutment sloping, and the sloping of fills above abutments, as well as the dam's width and base conditions must also be considered in relation to potential hydraulic fractures. It was concluded that upstream sand beaches and internal filters can help to prevent hydraulic fractures in dams in compacted control zones. 5 refs., 16 figs.

  18. Characterization of landslide dams in the San Juan province (Argentina)

    Science.gov (United States)

    Penna, Ivanna; Longchamp, Celine; Derron, Marc-Henri; Jaboyedoff, Michel

    2013-04-01

    River blockages caused by landslide deposition are common phenomena in active mountain chains, influencing erosion-sedimentation patterns and acting as primary and secondary hazards. Regional scale analyses regarding their spatial distribution and morphometry allow establishing boundary conditions for their occurrence and stability, and determine differences among regions with different landscape and climatic conditions. Owing to the combination of endogenous and exogenous factors, landslide dams are frequent phenomena in the Andes. In the Argentinean NW and the Patagonian Andes, previous studies showed that stability of landslide dams determined by morphometric parameters generally matched satisfactorily with dam behavior, with some exceptions in which climatic component played an important role in dam longevity. Aiming to expand the knowledge of landslide dams in the Argentinean Andes, in this work we analyzed the stability of rock avalanche dams in the Pampeam flat slab subduction zone. In the study area, mountain dynamics creates suitable conditions for the occurrence of 34 rock avalanches with volumes up to 0.3 km3. They developed in deeply carved valleys (Cordillera) and Inter-thrust valleys (Precordillera). 22 impoundments of rivers resulted from channelized rock avalanches with long runouts (4-10 km) that blocked tributaries rivers, but most of them by rock avalanches that filled the valley bottom, with run up in the opposite slope and limited movement parallel to the valley axis. Most of the dams breached in unknown times, except for the last event that occurred on November 12th 2005. The quantification of morphometric parameters and contributing areas indicates the existence of dams with dimensionless blockage index above 2.75 (stable domain) and below 3.08 (instable domain). The Los Erizos dam in our study area and the Barrancas dam in the Patagonian Andes show that besides morphometric parameters, climatic conditions are decisive. Stable landslide dams

  19. Engineers find climbing techniques work well for dam inspections

    Energy Technology Data Exchange (ETDEWEB)

    O`Shea, M.; Graves, A. [Bureau of Reclamation, Denver, CO (United States)

    1996-10-01

    Climbing techniques adopted by the Bureau of Reclamation to inspect previously inaccessible or difficult to reach features at dams are described. Following the failure of the steel radial-arm gate at Folsom Dam, engineers mounted an effort to reach and inspect the dam`s seven other spillway gates. This close-up examination was performed to: (1) determine the condition of these gates; and (2) gather clues about the failure of the one gate. The access techniques described involved mountaineering techniques, as opposed to high scaling techniques, performed with dynamic and static nylon kermantle ropes.

  20. Responses of riparian reptile communities to damming and urbanization

    Science.gov (United States)

    Hunt, Stephanie D.; Guzy, Jacquelyn C.; Price, Steven J.; Halstead, Brian J.; Eskew, Evan A.; Dorcas, Michael E.

    2013-01-01

    Various anthropogenic pressures, including habitat loss, threaten reptile populations worldwide. Riparian zones are critical habitat for many reptile species, but these habitats are also frequently modified by anthropogenic activities. Our study investigated the effects of two riparian habitat modifications-damming and urbanization-on overall and species-specific reptile occupancy patterns. We used time-constrained search techniques to compile encounter histories for 28 reptile species at 21 different sites along the Broad and Pacolet Rivers of South Carolina. Using a hierarchical Bayesian analysis, we modeled reptile occupancy responses to a site's distance upstream from dam, distance downstream from dam, and percent urban land use. The mean occupancy response by the reptile community indicated that reptile occupancy and species richness were maximized when sites were farther upstream from dams. Species-specific occupancy estimates showed a similar trend of lower occupancy immediately upstream from dams. Although the mean occupancy response of the reptile community was positively related to distance downstream from dams, the occupancy response to distance downstream varied among species. Percent urban land use had little effect on the occupancy response of the reptile community or individual species. Our results indicate that the conditions of impoundments and subsequent degradation of the riparian zones upstream from dams may not provide suitable habitat for a number of reptile species.

  1. Sinkhole investigated at B.C. Hydro`s Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1996-07-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro`s W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig.

  2. Analytical Solution and Application for One-Dimensional Consolidation of Tailings Dam

    Directory of Open Access Journals (Sweden)

    Hai-ming Liu

    2018-01-01

    Full Text Available The pore water pressure of tailings dam has a very great influence on the stability of tailings dam. Based on the assumption of one-dimensional consolidation and small strain, the partial differential equation of pore water pressure is deduced. The obtained differential equation can be simplified based on the parameters which are constants. According to the characteristics of the tailings dam, the pore water pressure of the tailings dam can be divided into the slope dam segment, dry beach segment, and artificial lake segment. The pore water pressure is obtained through solving the partial differential equation by separation variable method. On this basis, the dissipation and accumulation of pore water pressure of the upstream tailings dam are analyzed. The example of typical tailings is introduced to elaborate the applicability of the analytic solution. What is more, the application of pore water pressure in tailings dam is discussed. The research results have important scientific and engineering application value for the stability of tailings dam.

  3. Landslide-dammed lake at Tangjiashan, Sichuan province, China (triggered by the Wenchuan Earthquake, May 12, 2008): Risk assessment, mitigation strategy, and lessons learned

    Science.gov (United States)

    Cui, P.; Dang, C.; Zhuang, J.; You, Y.; Chen, X.; Scott, K.M.

    2012-01-01

    Landslides and rock avalanches triggered by the 2008 Wenchuan Earthquake produced 257 landslide dams, mainly situated along the eastern boundary of the Qinghai-Tibet Plateau where rivers descend approximately 3,000 m into the Sichuan Basin. The largest of these dams blocked the Tongkou River (a tributary of the Fujiang River) at Tangjiashan. The blockage, consisting of 2. 04 ?? 10 7 m 3 of landslide debris, impounded a lake with a projected maximum volume of 3. 15 ?? 10 8 m 3, potentially inundating 8. 92 km 2 of terrain. Its creation during the rainy season and the possibility of an uncontrolled release posed a serious, impending threat to at least 1. 3 million people downstream that could add substantially to the total of 69,200 individuals directly killed by the earthquake. Risk assessment of the blockage indicated that it was unlikely to collapse suddenly, and that eventual overtopping could be mitigated by notching the structure in order to create an engineered breach and achieve safe drainage of the lake. In addition to the installation of monitoring and warning instrumentation, for emergency planning we estimated several outburst scenarios equivalent to 20, 25, 33, and 50% of the dam failing suddenly, creating, respectively, 3. 35, 3. 84, 4. 22, and 4. 65 km 2 of flooded area, and overbank water depths of 4. 6, 5. 1, 5. 7, and 6. 2 m, respectively, in Mianyang, the second largest city in Sichuan Province, 48 km downstream from the blockage. Based on these scenarios, recommendations and plans for excavating a sluiceway, draining the lake, and downstream evacuation were proposed and later were implemented successfully, with the blockage breached by overtopping on June 10, less than a month after dam emplacement. The peak discharge of the release only slightly exceeded the flood of record at Mianyang City. No lives were lost, and significant property damage was avoided. Post-breaching evaluation reveals how future similar mitigation can be improved. Although

  4. Geophysics Methods in Electrometric Assessment of Dams

    Energy Technology Data Exchange (ETDEWEB)

    Davydov, V. A., E-mail: davydov-va@yandex.ru; Baidikov, S. V., E-mail: badikek@mail.ru; Gorshkov, V. Yu., E-mail: vitalaa@yandex.ru; Malikov, A. V., E-mail: alex.mal.1986@mail.ru [Russian Academy of Sciences, Geophysical Institute, Ural Branch (Russian Federation)

    2016-07-15

    The safety assessment of hydraulic structures is proposed to be conducted via geoelectric measurements, which are capable of assessing the health of earth dams in their natural bedding without intervention in their structure. Geoelectric measurements are shown as being capable of pinpointing hazardous parts of a dam, including areas of elevated seepage. Applications of such methods are shown for a number of mini-dams in the Sverdlovsk region. Aparameter (effective longitudinal conductivity) that may be used to monitor the safety of hydraulic structures is proposed. Quantitative estimates of this parameter are given in terms of the degree of safely.

  5. National Dam Safety Program. Lakeview Estates Dam (MO 11004), Mississippi - Kaskaskia - St. Louis Basin, Warren County, Missouri. Phase I Inspection Report.

    Science.gov (United States)

    1979-09-01

    ificatiozh Distributon/ Availabilit oe LAKEVIEW ESTATES DAM WARREN COUNTY, MISSOURI MISSOURI INVENTORY NO. 11004 PHASE I INSPECTION REPORT NATIONAL DAM SAFETY...and *impounds less than 1,000 acre-feet of water . Our inspection and evaluation indicates that the spill- way of Lakeview Estates Dam does not meet...not be measured because of high reservoir level, scalloping near the crest and a berm just under the water surface. Limestone riprap in sizes from sand

  6. Seismic Fortification Analysis of the Guoduo Gravity Dam in Tibet, China

    Directory of Open Access Journals (Sweden)

    Peng Lin

    2015-01-01

    Full Text Available The primary aim of this research was to analyze the seismic performance of the Guoduo gravity dam. A nonlinear FEM method was implemented to study the deformation, stress, and overall stability of dam under both static and dynamic loading conditions, including both normal and overloading conditions. A dam seismic failure risk control method is proposed based on the cracking mechanism induced by the dynamic load to ensure dam safety and stability. Numerical simulation revealed that (1 under normal static and dynamic loading the symmetry of the displacement distributions is good, showing that the dam abutments and riverbed foundation have good overall stiffness. The stress distribution is a safe one for operation under both normal water loading and seismic loading. (2 Attention should be paid to the reinforcement design of outlets of the diversion dam monoliths, and enhance the capability of sustaining that tensile stress of dam monoliths. (3 The shape of the dam profile has a significant effect on the dynamic response of the dam. (4 By employing the “overload safety factor method,” the overall seismic fortification is as follows: K1=1.5, K2= 2~3, and K3= 3~4.

  7. In the Land of the Dammed: Assessing Governance in Resettlement of Ghana’s Bui Dam Project

    Directory of Open Access Journals (Sweden)

    Kwabena Asiama

    2017-11-01

    Full Text Available Resettlement resulting from dam construction has raised several concerns due to the negative aftermath impacts. In Ghana, the construction of three hydroelectric dams resulted in large-scale resettlements. Given the little experience that Ghana has in resettlements, it is necessary for a robust monitoring structure for resettlements. However, this was not available in the last resettlement undertaken for the Bui Dam Project. This paper aims at developing an assessment framework for monitoring resettlement activities on customary lands from a good governance perspective. Based on four good governance principles, transparency, public participation and inclusiveness, equity and rule of law and accountability, a good governance assessment framework is built and applied to the Bui Dam Project using a case study approach. Data were collected through interviews and focus group discussion with the key actors of the resettlement project. It was first found that the planning stage of the resettlement came out with a robust plan that was to prevent the impoverishment of the affected persons. However, in the implementation of the resettlement, not all good governance principles were adhered to. In conclusion, it was found that by deconstructing the resettlement process with a good governance framework, the problematic areas of the resettlement can be effectively differentiated between the planning and implementation phases.

  8. National Inventory of Dams Coastal California Extract 2010

    Data.gov (United States)

    California Department of Resources — The National Inventory of Dams (NID) is a congressionally authorized database, which documents dams in the U.S. and its territories. The NID was most recently...

  9. National Inventory of Dams Coastal California Extract 2010

    Data.gov (United States)

    California Natural Resource Agency — The National Inventory of Dams (NID) is a congressionally authorized database, which documents dams in the U.S. and its territories. The NID was most recently...

  10. Seismic risks at Elsie Lake Main Dam

    International Nuclear Information System (INIS)

    McCammon, N.R.; Momenzadeh, M.; Hawson, H.H.; Nielsen, N.M.

    1991-01-01

    The Elsie Lake dams are located on Vancouver Island in an area of high seismic risk. A safety review in 1986 indicated potential deficiencies in the earthfill main dam with respect to modern earthquake design standards. A detailed field investigation program comprising drilling and penetration tests was carried out and the results used in an assessment of seismic stability. A 0.8 m thick less dense layer in the granular shell of the dam, possibly caused by wet construction conditions, would likely liquefy in a major earthquake but sufficient residual strength would likely remain to prevent catastrophic failure. The dam shell might undergo some distortion, and an assessment was initiated to determine the requirements for reservoir drawdown following an extreme earthquake to ensure the timely lowering of the reservoir for inspection and repair. It was suggested that an adequate evacuation capability would be 25% and 50% drawdown in not more than 30 and 50 days, respectively. 9 refs., 11 figs., 1 tab

  11. The environmental impact of large dams

    International Nuclear Information System (INIS)

    Razvan, E.

    1992-01-01

    The campaigns of conservationist groups against dams are generally based on rather emotional issues. This paper puts the situation in a more rational perspective, by analysing the various claims which tend to be put forward concerning the impacts of large dams, examining the validity of the arguments, looking at ways in which any adverse effects can be mitigated, and presenting the complexity of the problems. (author)

  12. Discussion on the Safety Factors of Slopes Recommended for Small Dams

    Directory of Open Access Journals (Sweden)

    Jan Vrubel

    2017-01-01

    Full Text Available The design and assessment of the slope stability of small embankment dams is usually not carried out using slope stability calculations but rather by the comparison of proposed or existing dam slopes with those recommended by technical standards or guidelines. Practical experience shows that in many cases the slopes of small dams are steeper than those recommended. However, most of such steeper slopes at existing dams do not exhibit any visible signs of instability, defects or sliding. For the dam owner and also for dam stability engineers, the safety of the slope, expressed e.g. via a factor of safety, is crucial. The aim of this study is to evaluate the safety margin provided by recommended slopes. The factor of safety was evaluated for several dam shape and layout variants via the shear strength reduction method using PLAXIS software. The study covers various dam geometries, dam core and shoulder positions and parameter values of utilised soils. Three load cases were considered: one with a steady state seepage condition and two with different reservoir water level drawdown velocities – standard and critical. As numerous older small dams lack a drainage system, variants with and without a toe drain were assessed. Calculated factors of safety were compared with required values specified by national standards and guidelines.

  13. Owyhee River intracanyon lava flows: does the river give a dam?

    Science.gov (United States)

    Ely, Lisa L.; Brossy, Cooper C.; House, P. Kyle; Safran, Elizabeth B.; O'Connor, Jim E.; Champion, Duane E.; Fenton, Cassandra R.; Bondre, Ninad R.; Orem, Caitlin A.; Grant, Gordon E.; Henry, Christopher D.; Turrin, Brent D.

    2013-01-01

    Rivers carved into uplifted plateaus are commonly disrupted by discrete events from the surrounding landscape, such as lava flows or large mass movements. These disruptions are independent of slope, basin area, or channel discharge, and can dominate aspects of valley morphology and channel behavior for many kilometers. We document and assess the effects of one type of disruptive event, lava dams, on river valley morphology and incision rates at a variety of time scales, using examples from the Owyhee River in southeastern Oregon. Six sets of basaltic lava flows entered and dammed the river canyon during two periods in the late Cenozoic ca. 2 Ma–780 ka and 250–70 ka. The dams are strongly asymmetric, with steep, blunt escarpments facing up valley and long, low slopes down valley. None of the dams shows evidence of catastrophic failure; all blocked the river and diverted water over or around the dam crest. The net effect of the dams was therefore to inhibit rather than promote incision. Once incision resumed, most of the intracanyon flows were incised relatively rapidly and therefore did not exert a lasting impact on the river valley profile over time scales >106 yr. The net long-term incision rate from the time of the oldest documented lava dam, the Bogus Rim lava dam (≤1.7 Ma), to present was 0.18 mm/yr, but incision rates through or around individual lava dams were up to an order of magnitude greater. At least three lava dams (Bogus Rim, Saddle Butte, and West Crater) show evidence that incision initiated only after the impounded lakes filled completely with sediment and there was gravel transport across the dams. The most recent lava dam, formed by the West Crater lava flow around 70 ka, persisted for at least 25 k.y. before incision began, and the dam was largely removed within another 35 k.y. The time scale over which the lava dams inhibit incision is therefore directly affected by both the volume of lava forming the dam and the time required for sediment

  14. Some aspects in the legal regulation of the dams

    International Nuclear Information System (INIS)

    Tancev, Ljubomir

    1996-01-01

    In order to ensure high quality and low cost design and building of dams and appurtenant structures, as well as safe exploitation, it is obvious to have appropriate legislation. Keeping in mind that the dams are unique structures, for the design stage the legislation should be less strong. For the next phases - building, maintenance and exploitation - detail and rigorous legislation is recommended. It is emphasised that the engineers should have more freedom designing the dams, but they should be obvious to apply the most recent achievement in the field of the dam design and construction. For illustration, some aspects of three important questions are discussed - 1) the choice of maximum flood discharge, 2) the application of new materials and construction methods and 3) the application of modern methods for static and dynamic analysis of dams. (Author)

  15. Analytical Solution and Application for One-Dimensional Consolidation of Tailings Dam

    OpenAIRE

    Liu, Hai-ming; Nan, Gan; Guo, Wei; Yang, Chun-he; Zhang, Chao

    2018-01-01

    The pore water pressure of tailings dam has a very great influence on the stability of tailings dam. Based on the assumption of one-dimensional consolidation and small strain, the partial differential equation of pore water pressure is deduced. The obtained differential equation can be simplified based on the parameters which are constants. According to the characteristics of the tailings dam, the pore water pressure of the tailings dam can be divided into the slope dam segment, dry beach seg...

  16. 33 CFR 117.705 - Beaver Dam Creek.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Beaver Dam Creek. 117.705 Section 117.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements New Jersey § 117.705 Beaver Dam Creek. The draw of the...

  17. Dams. Bulletin of the technical service of electric power and big dams; Barrages. Bulletin du service technique de l`energie electrique et des grands barrages

    Energy Technology Data Exchange (ETDEWEB)

    Davard, J.

    1997-12-31

    The Dams bulletin reports on technical news concerning big French dams in operation. This issue comprises 5 papers. Two of them are examples of granting problems which led to the dismantling of the dams of Kernansquillec (Cotes d`Armor, France) and Maisons-Rouges (Indre-et-Loire, France) for economical and environmental reasons. The 3 other papers concern the life of French dams (technical control reports of the French dams in operation), the activities of the control service (annual inspections, preparation of draining operations, renewing of granting), and some general information (organisation of competent authorities, colloquium reports, hydro-power production during the first quarter of 1997). (J.S.)

  18. Credit Union Headquarters

    Data.gov (United States)

    Department of Homeland Security — The National Credit Union Administration (NCUA) is the independent federal agency that charters and supervises federal credit unions. NCUA, backed of the full faith...

  19. Fosfortab fra det dyrkede areal til Stevning Dam, Hindemaj og Haderslev Dam

    DEFF Research Database (Denmark)

    Andersen, Hans Estrup; Heckrath, Goswin; Thodsen, Hans

    Størrelsen af dyrkningsbidraget til søerne i Haderslev Dam-systemet er vurderet med to forskellige metoder til at udgøre ca. 42 % af den samlede tilførsel. En risikokortlægning med det nye, danske P-indeks viser, at i alt 15 % af det dyrkede areal er i højrisiko mht. fosfortab. P-indeks-kortlægni......Størrelsen af dyrkningsbidraget til søerne i Haderslev Dam-systemet er vurderet med to forskellige metoder til at udgøre ca. 42 % af den samlede tilførsel. En risikokortlægning med det nye, danske P-indeks viser, at i alt 15 % af det dyrkede areal er i højrisiko mht. fosfortab. P...

  20. BANKING UNION - ROMANIAN PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    Coroiu Sorina Ioana

    2015-07-01

    Full Text Available The financial crisis showed that banks were not able to face the loss, because there is no framework for a resolution, so that it intervened with money from taxpayers. So, it has been highlighted the need to update the regulations applicable to the banking sector. Creating a single supervisory mechanism in the fall of 2014 was a time reference point to achieve a banking union in Europe. Banking Union is one of the four foundations for a genuine Economic and Monetary Union. The paper’s purpose is to analyze the Banking Union structure, based on three pillars: (i The Single Supervisory Mechanism - the transfer of the main responsibility regarding banking supervision from national to European level, (ii The Single Resolution Mechanism - introduction of common provisions to ensure legal support required to manage bank failures problem, (iii The Deposit Guarantee Schemes - harmonization of deposit guarantee rules. These measures were adopted at European Union level to ensure the stability of the European banking system and to prevent future crises. Because countries that are not part of the euro area are not required to join the Banking Union, the dilemma of these countries lies in the decision to join the Banking Union quickly or to wait. It is the case of Romania, also, so, this paper analyze the opportunity of Romania's accession to the Banking Union before adopting the euro. There are analyzed the advantages and disadvantages of Romania's participation in the Banking Union, showing that, in the context of single currency introduction, Romania's participation is required. So far, there are reduced debates regarding the need, advantages and disadvantages of Romania's participation in the European Banking Union, the top representatives of the National Bank of Romania being among the few who expressed their views in public and published papers on the subject.

  1. Unions and the Sword of Justice: Unions and Pay Systems, Pay Inequality, Pay Discrimination and Low Pay

    OpenAIRE

    A Charlwood; K Hansen; David Metcalf

    2000-01-01

    Dispersion in pay is lower among union members than among non-unionists. This reflects two factors. First, union members and jobs are more homogeneous than their non-union counterparts. Second, union wage policies within and across firms lower pay dispersion. Unions'' minimum wage targets also truncate the lower tail of the union distribution. There are two major consequences of these egalitarian union wage policies. First, the return to human capital is lower in firms which recognise unions ...

  2. VOLCANISM OF HOT SPOTS ON THE RÉUNION AS THE EXAMPLE

    Directory of Open Access Journals (Sweden)

    Dragan Radovanović

    2016-12-01

    Full Text Available Réunion (French: La Réunion, formerly: Īle Bourbon is beside the Mauritius the largest and the youngest island on the Mascarene Plateau in the Indian Ocean. The island is of volcanic origin, formed through volcanic activity initiated by deeply settled “hot spot” inside the Earth’s mantle. It was formed within the last 2 million years from lava effusions whose volume is up to now nearly 75,000 km3. Only 3% of its volume is emergent and the total height from the sea floor is 6,500 m. The island is about 40 km in width with about 800,000 inhabitants. The capital city is St Denis. The nature of the island is impressive: active volcano, mountains above 3,000 m in height and deep canyon, frequently exceeding 2,000 m in depth. Since 2010, about 40% of its area is announced a National park and a UNESCO World Heritage site.

  3. Dam-break studies for mine tailings impoundments

    International Nuclear Information System (INIS)

    Jeyapalan, J.K.

    1982-01-01

    This paper describes simple procedures for performing dam-break analyses. Tailings from dam failures usually liquefy and flow for substantial distances as a viscous fluid. The prediction of the possible extent of flow slide movement is illustrated using two case histories. Topics considered include the flow behavior of liquefied talings, dimensionsless numbers for mine tailings and associated flow regimes, laminar flow, and turbulent flow. The potential inundation regions downstream of mine tailings dams are assessed. It is concluded that instances of flow slides of mine waste embankments indicate that the failure of these structures has considerable potential for damage to life and property in many cases

  4. Dams and river dolphins: Can they co-exist?

    International Nuclear Information System (INIS)

    Reeves, R.R.; Leatherwood, S.

    1994-01-01

    Dam construction is one of many ways that humans have modified river-dolphin habitats. It is suggested that physiographic and hydrologic complexity plays an important role in making rivers suitable for dolphins. If this hypothesis is true, then it can be assumed that dams and other artificial obstructions degrade dolphin habitat insofar as they reduce such complexity. This paper identifies some of the impacts that dams, barrages, and dikes might have on dolphins. Research is needed at project sites, both before and after construction, to document impacts. Specially designed ''swimways'' may allow upstream and downstream passage by dolphins and thus mitigate at least one of the adverse effects of dam projects, namely population fragmentation, but such measures aimed at benefiting single species are no substitute for protecting ecosystems. 30 refs

  5. Dynamic probability evaluation of safety levels of earth-rockfill dams using Bayesian approach

    Directory of Open Access Journals (Sweden)

    Zi-wu Fan

    2009-06-01

    Full Text Available In order to accurately predict and control the aging process of dams, new information should be collected continuously to renew the quantitative evaluation of dam safety levels. Owing to the complex structural characteristics of dams, it is quite difficult to predict the time-varying factors affecting their safety levels. It is not feasible to employ dynamic reliability indices to evaluate the actual safety levels of dams. Based on the relevant regulations for dam safety classification in China, a dynamic probability description of dam safety levels was developed. Using the Bayesian approach and effective information mining, as well as real-time information, this study achieved more rational evaluation and prediction of dam safety levels. With the Bayesian expression of discrete stochastic variables, the a priori probabilities of the dam safety levels determined by experts were combined with the likelihood probability of the real-time check information, and the probability information for the evaluation of dam safety levels was renewed. The probability index was then applied to dam rehabilitation decision-making. This method helps reduce the difficulty and uncertainty of the evaluation of dam safety levels and complies with the current safe decision-making regulations for dams in China. It also enhances the application of current risk analysis methods for dam safety levels.

  6. Mechanism Research of Arch Dam Abutment Forces during Overload

    Directory of Open Access Journals (Sweden)

    Yu Xia

    2015-01-01

    Full Text Available This paper presents research on the abutment forces of a double-curvature arch dam during overload based on numerical calculation results obtained through finite element method by Ansys. Results show that, with an increase in elevation, the abutment forces and bending moment of the arch dam increase first and then decrease from the bottom to the top of the dam. Abutment forces and bending moment reach their maximum at the middle or middle-down portion of the dam. The distributions of abutment forces and moment do not change during overload. The magnitude of each arch layer’s forces and moment increases linearly during overload. This result indicates that each arch layer transmits bearing loads to the rocks of the left and right banks steadily. This research explains the operating mechanism of an arch dam under normal and overload conditions. It provides a simple method to calculate the distribution of forces Fx and Fy and a new method to calculate the overload factor of an arch dam through the estimation of arch layers based on the redistribution characteristic of arch abutment forces.

  7. Musculoskeletal Disorders study in damming construction workers by Fox equation and measurement heart rate at work

    Directory of Open Access Journals (Sweden)

    L. Gheibi

    2008-04-01

    Full Text Available Background and aims   Musculoskeletal Disorders are prevalent in construction workers in comparison to other working groups. These workers in damming construction worked at awkward  postures for long times, so ergonomic assessment of jobs was important.   Methods   This is a descriptive-analytical cross sectional study that conducted in 2008 on a random sample of workers of damming construction in Takab city (110 men who were assessed by Nordic Musculoskeletal questionnaire and digital indicator for heart measurement. To estimate  Vo2max consumption Fox equation was used and data were analyzed by SPSS software.   Results   The average of total time of worked was 36.6 86.8 months. Results showed that the  most prevalent (%55.5 MSDs was low back pain which was positively related with type of job,  the number of standing and sitting posotions at work, total time of work, age, smoking, level of   education, weight,Vo2max that estimated by Fox Equation, and heart rate at working (P<0.05.   Conclusion   The results of this study reveal that prevalence rate of musculoskeletal disorders are high among damming construction workers, and heart rate and Vo2max consumption increases with increase in work load. Therefore, optimal physiological conditions should be considered  and physical capacity be measured. Prior to employment of workers approperiate corrections are  warranted      

  8. Determining The Water Quality of Maruf Dam (Boyabat–Sinop

    Directory of Open Access Journals (Sweden)

    Ekrem MUTLU

    2017-06-01

    Full Text Available In this study, the preliminary findings obtained from 3 sampling points, which represent the whole, on Maruf Irrigation Dam, which is located in Boyabat district of Sinop province, for 12 months between September 2015 and August 2016 were examined. The parameters monitored are temperature, dissolved oxygen, pH, electrical conductivity, total hardness, total alkalinity, chemical oxygen demand, biological oxygen demand, and dissolved anions and cations (sodium, potassium, calcium, magnesium, ammonium, nitrate, phosphate, chloride, sulfate, and sulfite. Because of its low dissolved ionic matter content, Maruf Dam was characterized as an alkali dam with mid-hard water and low electrical conductivity. In terms of parameters A and B of Surface Water Quality Management Regulation, the dam is considered “high-quality” and “unpolluted”. Besides the irrigation purposes, for which the barrage was constructed, the dam can also be used for aquaculture, animal breeding, and farming needs.

  9. MNR's role in public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Keyes, Jennifer [Ministry of Natural Resources, Peterborough, ON (Canada)

    2011-07-01

    The Ministry of Natural Resources (MNR) is the largest dam owner in Ontario with around 400 dams located all across the province. MNR works to exercise stewardship of Ontario's water resources in a context of public safety, employee safety and environmental awarenes. This presentation shows the different measures MNR implemented to reduce risks. Warning signs, safety booms, barrel buoys and pedestrian fencing have been installed around dams to alert the public to possible dangers. In addition, MNR employees receive training in how to inspect dams for safety concerns, how to identify problems which could result in hazards to the public and how to work safely.

  10. Detection of Water Leaks in Beni-Haroun Dam (Algeria)

    International Nuclear Information System (INIS)

    Hocini, N.; Mami, M.

    2011-01-01

    The main objective of this work was to detect water leakage origin combining conventional, tracing and isotope techniques. The investigation was performed by a research team from the 'Algiers Nuclear Research Centre' in collaboration with engineers from the 'National Agency for Dams'. The chemical and isotopic results have shown no influence of dam water on the water sampled at the piezometers and drains that are present in the close neighbourhood of the dam. However, the water flowing at drain D15 has exhibited the nearest quality to that dam. Dye tracing has shown a water circulation through complex pathways for the left bank. (author)

  11. Inventory of Dams in the State of Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Permitted dams in Iowa and associated attributes, as recorded by the Floodplain Section of the DNR. The dams regulated are those with the parameters listed below: a....

  12. User's Guide: Arch Dam Stress Analysis System (ADSAS)

    National Research Council Canada - National Science Library

    1997-01-01

    .... ADSAS assumes linear elastic behavior for the entire dam, i.e. the dam is assumed to support the computed tensile stresses within the concrete mass and across the monolith joints without cracking or opening the joints...

  13. Dams. Bulletin of the Technical Service of Electric Power and Big Dams; Barrages. Bulletin du Service Technique de l`Energie Electrique et des Grands Barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Four papers were selected in this issue of the bulletin of the Technical Service of Electric Power and Big Dams. The first one concerns the `Catastrophe Medicine` congress which took place in Amiens (France) in December 5 to 7 1996 and during which the analysis of experience feedbacks and lessons gained after dam accidents and organisation of emergency plans was discussed. The second one is a report of the conclusions of the decennial and annual inspections of French dams. The third paper describes the reinforcement of the Lavaud-Gelade dam embankment and the last paper reports on the Control Services activities concerning the French dams in operation for the forth quarter of the year 1996. (J.S.)

  14. Atmospheric Rivers, Climate Change, and the Howard Hanson Dam

    Science.gov (United States)

    Warner, M.; Mass, C.; Shaffer, K.; Brettman, K.

    2017-12-01

    All wintertime extreme precipitation and major flooding events in Western Washington are associated with Atmospheric Rivers (ARs), narrow bands of elevated integrated water vapor transport (IVT) stretching from the tropical Pacific Ocean to the Pacific Northwest coast. Several studies over the last decade have suggested that climate change could impact the intensity, frequency, timing, and structure of Pacific Northwest extreme precipitation. The Howard Hanson Dam is situated on the Green River in the central Cascade Mountains in Western Washington and is operated by the US Army Corps of Engineers (USACE) in Seattle. The reservoir behind the dam has two functions: It is the main water supply for the city of Tacoma and is filled during the summer months, and it is empty during winter months when it is used for flood risk management during AR events, protecting billions of dollars of infrastructure downstream. The reservoir is maintained by the Cascade Mountains' abundant winter snowpack and precipitation. Since the reservoir behind Howard Hanson Dam must be empty before the flood season starts and is reliant on snowpack and precipitation to fill in late spring, impacts due to climate change are important for how the USACE operates and manages flood risk and water supply in the future. This work describes changes in the structure, climatology, and seasonality of cool-season atmospheric rivers influencing the west coast of North America by examining the projections of Coupled Model Intercomparison Project 5 (CMIP5) climate simulations forced by the Representative Concentration Pathway (RCP) 8.5 scenario. There are only slight changes in AR frequency and seasonality between historical (1970-1999) and future (2070-2099) periods considering the most extreme days (99th percentile) in integrated water vapor transport (IVT) along the West Coast, particularly along the southern part of the U.S. west coast, where some changes in the most extreme events are statistically

  15. Risk Perception Analysis Related To Existing Dams In Italy

    Science.gov (United States)

    Solimene, Pellegrino

    2013-04-01

    In the first part of this work, the progress of Italian National Rules about dams design, construction and operation are presented to highlight the strong connection existing between the promulgation of new decrees, as a consequence of a dam accidents, and the necessity to prevent further loss of lives and goods downstream. Following the Gleno Dam failure (1923), a special Ministerial Committee wrote out the first Regulations and made the proposal to establish, within the High Council of Public Works, a special department that become soon the "Dam Service", with the tasks of control and supervision about construction and operation phases of the dams and their reservoirs. A different definition of tasks and the structure of Dam Service were provided in accordance with law n° 183/1989, which transferred all the technical services to the Office of the Prime Minister; the aim was to join the Dam Office with the Department for National Technical Services, with the objective of increasing the knowledge of the territory and promoting the study on flood propagation downstream in case of operations on bottom outlet or hypothetical dam-break. In fact, population living downstream is not ready to accept any amount of risk because has not a good knowledge of the efforts of experts involved in dam safety, both from the operators and from the safety Authority. So it's important to optimize all the activities usually performed in a dam safety program and improve the emergency planning as a response to people's primary needs and feeling about safety from Civil Protection Authority. In the second part of the work, a definition of risk is provided as the relationship existing between probability of occurrence and loss, setting out the range within to plan for prevention (risk mitigation), thanks to the qualitative assessment of the minimum safety level that is suited to assign funds to plan for Civil Protection (loss mitigation). The basic meaning of the reliability of a zoned

  16. Dam safety review using non-destructive methods for reinforced concrete structure

    Energy Technology Data Exchange (ETDEWEB)

    Philibert, Alain; Saint-Pierre, Francois; Turcotte, Bernard [Le Groupe S.M. International Inc., Sherbrooke, (Canada)

    2010-07-01

    Dams built at the beginning of the twentieth century include concrete structures that were put in under rehabilitation works. In some cases, the details of the structures are not well documented. In other cases, concrete damage can be hidden under new layers of undamaged material. This requires that the dam safety review in a real investigation gather the information necessary for carrying out the hydraulic and stability studies required by the Dam Safety Act. This paper presented the process of dam safety review using non-destructive methods for reinforced concrete structures. Two reinforced concrete dams built in the 1900's, the Eustic dam on the Coaticook River and the Frontenac dam on the Magog River near Sherbrooke, were evaluated by S.M. International using non-destructive methods such as sonic and ground penetrating radar methods. The studies allowed mapping of concrete damage and provided geometric information on some non visible structure elements that were part of previous reinforcement operations.

  17. Labor unions and safety climate: perceived union safety values and retail employee safety outcomes.

    Science.gov (United States)

    Sinclair, Robert R; Martin, James E; Sears, Lindsay E

    2010-09-01

    Although trade unions have long been recognized as a critical advocate for employee safety and health, safety climate research has not paid much attention to the role unions play in workplace safety. We proposed a multiple constituency model of workplace safety which focused on three central safety stakeholders: top management, ones' immediate supervisor, and the labor union. Safety climate research focuses on management and supervisors as key stakeholders, but has not considered whether employee perceptions about the priority their union places on safety contributes contribute to safety outcomes. We addressed this gap in the literature by investigating unionized retail employee (N=535) perceptions about the extent to which their top management, immediate supervisors, and union valued safety. Confirmatory factor analyses demonstrated that perceived union safety values could be distinguished from measures of safety training, workplace hazards, top management safety values, and supervisor values. Structural equation analyses indicated that union safety values influenced safety outcomes through its association with higher safety motivation, showing a similar effect as that of supervisor safety values. These findings highlight the need for further attention to union-focused measures related to workplace safety as well as further study of retail employees in general. We discuss the practical implications of our findings and identify several directions for future safety research. 2009 Elsevier Ltd. All rights reserved.

  18. How to manage the cumulative flood safety of catchment dams ...

    African Journals Online (AJOL)

    Dam safety is a significant issue being taken seriously worldwide. However, in Australia, although much attention is being devoted to the medium- to large-scale dams, minimal attention is being paid to the serious potential problems associated with smaller dams, particularly the potential cumulative safety threats they pose ...

  19. Priority ranking for maintenance activities on embankment dams

    International Nuclear Information System (INIS)

    Chouinard, L.E.; Andersen, G.R.; Robichaud, J.G.; Blanchette, G.; Gervais, R.

    1998-01-01

    Operators of dams in Canada and the U.S. are steadily shifting from construction of new facilities to the maintenance and repairs of existing ones. This paper emphasized the importance of prioritizing maintenance activities on embankment dams whose maintenance needs vary from structure to structure. Two parallel procedures were developed, one for monitoring devices and the other for defense groups. Both procedures are intended to be used together to rate the condition of the embankment dams. The term 'defense groups' is used to refer to the collection of physical components on dams to prevent adverse conditions from occurring that would result in an uncontrolled release of the reservoir. The priority rankings and condition indices developed by means of this procedure reflects the judgment of a panel of engineers and geologists who implement them. They are not to be interpreted as an index of dam safety. While the process is sufficiently well developed to warrant wide-spread distribution, it is considered to be still in the developmental stage. Therefore, it should be used in conjunction with other parallel processes evaluating structural, mechanical and electrical features of the structure under consideration. 6 refs., 7 tabs

  20. Cleveland Dam East Abutment : seepage control project

    Energy Technology Data Exchange (ETDEWEB)

    Huber, F.; Siu, D. [Greater Vancouver Regional District, Burnaby, BC (Canada); Ahlfield, S.; Singh, N. [Klohn Crippen Consultants Ltd., Vancouver, BC (Canada)

    2004-09-01

    North Vancouver's 91 meter high Cleveland Dam was built in the 1950s in a deep bedrock canyon to provide a reservoir for potable water to 18 municipalities. Flow in the concrete gravity dam is controlled by a gated spillway, 2 mid-level outlets and intakes and 2 low-level outlets. This paper describes the seepage control measures that were taken at the time of construction as well as the additional measures that were taken post construction to control piezometric levels, seepage and piping and slope instability in the East Abutment. At the time of construction, a till blanket was used to cover the upstream reservoir slope for 200 meters upstream of the dam. A single line grout curtain was used through the overburden from ground surface to bedrock for a distance of 166 meters from the dam to the East Abutment. Since construction, the safety of the dam has been compromised through changes in piezometric pressure, seepage and soil loss. Klohn Crippen Consultants designed a unique seepage control measure to address the instability risk. The project involved excavating 300,000 cubic meters of soil to form a stable slope and construction bench. A vertical wall was constructed to block seepage. The existing seepage control blanket was also extended by 260 meters. The social, environmental and technical issues that were encountered during the rehabilitation project are also discussed. The blanket extension construction has met design requirements and the abutment materials that are most susceptible to internal erosion have been covered by non-erodible blanket materials such as plastic and roller-compacted concrete (RCC). The project was completed on schedule and within budget and has greatly improved the long-term stability of the dam and public safety. 2 refs., 8 figs.

  1. Descriptive characteristics of the large Italian dams

    International Nuclear Information System (INIS)

    Dello Vicario, E.; Petaccia, A.; Savanella, V.

    1999-01-01

    In the present note the characteristics of the Italian dams are examined, underlining, in a statistical view, story, geographical location, types and use of the most important works. Such a review can be useful for a more detailed analysis, both for the dams characterization and for further studies relevant to water resources utilization [it

  2. Primary Productivity of the Cengklik Dam Boyolali

    Directory of Open Access Journals (Sweden)

    WIRYANTO

    2002-01-01

    Full Text Available Primary productivity dynamic of the water ecosystem was conducted faster in the last decades. This study was intended to find out the primary productivity of Cengklik dam Boyolali, Central Java to explain the ecosystem dynamic and to lead the maintenance of dam. This study used quantitative methods in completely randomized group design (CRD, and the data was analized by Analysis of Variance (ANAVA. Samples were taken horizontally in four sampling point, respectively in the riparian zone, around of the floating net (“karamba”, in the center of dam water and around of the ex-paddy fields. There were taken vertically in three-depth point in each of the sampling point, respectively 0.5 meter, 1.5 meter, and 2.5 meter. The results showed that the gross primary productivity of the dam was 11.122.500-22.545.600 mgC/m3/days, and the primary productivity differences in each of the point sampling caused by light intensity, nutrient supply, and abundance of the chlorophyll organisms.

  3. Management of agro-pastoral dams in Benin: stakeholders, institutions and rehabilitation research

    NARCIS (Netherlands)

    Kpéra, G.N.; Aarts, N.; Saïdou, A.; Tossou, R.C.; Eilers, C.H.A.M.; Mensah, G.A.; Sinsin, B.A.; Kossou, D.K.; van der Zijpp, A.J.

    2012-01-01

    Agro-pastoral dams are waterholes constructed to provide water for livestock and for agricultural development. In Benin, agro-pastoral dams are managed by dam management committees. This study seeks to (1) characterize the stakeholders involved in agro-pastoral dam use and management, (2) identify

  4. Fragmentation of Andes-to-Amazon connectivity by hydropower dams.

    Science.gov (United States)

    Anderson, Elizabeth P; Jenkins, Clinton N; Heilpern, Sebastian; Maldonado-Ocampo, Javier A; Carvajal-Vallejos, Fernando M; Encalada, Andrea C; Rivadeneira, Juan Francisco; Hidalgo, Max; Cañas, Carlos M; Ortega, Hernan; Salcedo, Norma; Maldonado, Mabel; Tedesco, Pablo A

    2018-01-01

    Andes-to-Amazon river connectivity controls numerous natural and human systems in the greater Amazon. However, it is being rapidly altered by a wave of new hydropower development, the impacts of which have been previously underestimated. We document 142 dams existing or under construction and 160 proposed dams for rivers draining the Andean headwaters of the Amazon. Existing dams have fragmented the tributary networks of six of eight major Andean Amazon river basins. Proposed dams could result in significant losses in river connectivity in river mainstems of five of eight major systems-the Napo, Marañón, Ucayali, Beni, and Mamoré. With a newly reported 671 freshwater fish species inhabiting the Andean headwaters of the Amazon (>500 m), dams threaten previously unrecognized biodiversity, particularly among endemic and migratory species. Because Andean rivers contribute most of the sediment in the mainstem Amazon, losses in river connectivity translate to drastic alteration of river channel and floodplain geomorphology and associated ecosystem services.

  5. SCENARIO OF AN ACCIDENT OF SOIL DAMS IN CASE OF WATER SPILL OVER A DAM CREST BY USING FAULT TREE ANALYSIS

    Directory of Open Access Journals (Sweden)

    Kuznetsov Dmitriy Viktorovich

    2016-04-01

    Full Text Available The scenario of a hydrodynamic accident of water flow over a crest of a soil dam is considered by the method of fault tree analysis, for which the basic reasons and controlled diagnostic indicators of an accident have been defined. Logical operators “AND”/”OR” were used for creation of a sequence of logically connected events, leading to an undesired event in the scenario of accident. The scenario of the accident was plotted in case of three basic reasons - an excessive settling of a dam crest, an excess flood, an inoperable spillway, taking into account the sequence of the events’ development and with observance of the necessary conditions leading to an accident. “Technical” reasons were observed in the present scenario, force majeure events were not considered. The provided scenario of the accident consists of two branches of events’ development: the left one that depends on an upstream level, and the right one that depends on settling of a dam crest. In each of the considered events an accident “the water spill over a crest of a soil dam” is possible only in case of execution of two different conditions at the same time, i.e. in case of an appropriate upstream level and the appropriate mark of a crest of a soil dam. The conditions of the accident are defined by diagnostic indices - the upstream level and settling of a dam crest, which at the same time are safety criteria of the hydraulic structure for soil dams. They allow defining the technical condition of the construction. Four possible technical conditions are suggested for the definition of technical statuses - normative, operable, limited operable, abnormal. Criteria of safety are the boundaries of the state: for loading and impact - it is the upstream level, for geometrical compliance of the construction - it is a dam crest mark.

  6. National Dam Safety Program. Clove Lake Dam (NJ 00259) Delaware River Basin, Shimers Brook, Sussex County, New Jersey. Phase I Inspection Report.

    Science.gov (United States)

    1981-08-01

    it be reclassified as low hazard. The spillway will pass the 100-year flood and is considered adequate. e. Ownership. The dam is owned by Clubhouse ...Associates. For information, contact Mr. Gerald Roby, Clubhouse Associates, RD 4, Box 108, Montague, New Jersey 07827. f. Purpose. The Clove Lake Dam...into what appears to be a man-made lake downstream of Clove Lake Dam about 0.5 mile. Although no homes are presently constructed around this downstream

  7. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  8. Users and Union Catalogues

    Science.gov (United States)

    Hartley, R. J.; Booth, Helen

    2006-01-01

    Union catalogues have had an important place in libraries for many years. Their use has been little investigated. Recent interest in the relative merits of physical and virtual union catalogues and a recent collaborative project between a physical and several virtual union catalogues in the United Kingdom led to the opportunity to study how users…

  9. Imperatriz [MA] and Porto Nacional [TO]: two cities, a river and many stories

    Directory of Open Access Journals (Sweden)

    Leandro Mendes Rocha

    2015-06-01

    Full Text Available This study aims to show, in the environmental history perspective, aspects related to the nature of the Tocantins River,the socioeconomic relations, cultural values and the riverside population’s lifestyle in the 20th and 21st centuries. This analysis is made through the study of two cities: Imperatriz (MA and Porto Nacional (TO. Its aim is to notice the spatial, environmental and socioeconomic transformations experienced by these cities. Furthermore, we intend to analyze, in a comparative way, the impacts related to the construction of the Belém-Brasília highway, the North-South and Carajás railways, the hydroelectric dams and the Araguaia-Tocantins waterway.

  10. Incremental Dynamic Analysis of Koyna Dam under Repeated Ground Motions

    Science.gov (United States)

    Zainab Nik Azizan, Nik; Majid, Taksiah A.; Nazri, Fadzli Mohamed; Maity, Damodar; Abdullah, Junaidah

    2018-03-01

    This paper discovers the incremental dynamic analysis (IDA) of concrete gravity dam under single and repeated earthquake loadings to identify the limit state of the dam. Seven ground motions with horizontal and vertical direction as seismic input considered in the nonlinear dynamic analysis based on the real repeated earthquake in the worldwide. All the ground motions convert to respond spectrum and scaled according to the developed elastic respond spectrum in order to match the characteristic of the ground motion to the soil type. The scaled was depends on the fundamental period, T1 of the dam. The Koyna dam has been selected as a case study for the purpose of the analysis by assuming that no sliding and rigid foundation, has been estimated. IDA curves for Koyna dam developed for single and repeated ground motions and the performance level of the dam identifies. The IDA curve of repeated ground motion shown stiffer rather than single ground motion. The ultimate state displacement for a single event is 45.59mm and decreased to 39.33mm under repeated events which are decreased about 14%. This showed that the performance level of the dam based on seismic loadings depend on ground motion pattern.

  11. Healthy cities: overview of a WHO international program.

    Science.gov (United States)

    Goldstein, G

    2000-01-01

    Health is the outcome of all the factors and activities impinging upon the lives of individuals and communities. The last decade has seen an emerging understanding within development circles that living conditions are greatly affected by local action, by the work of local government, and by community groups and organizations. In addressing health and environmental issues and making interventions, an integrated approach, based on 'settings', exemplified in the Healthy Cities approach, has proved most effective. A Healthy City project can involve people and organizations in the programs and activities that are needed for better health, and enables a city or neighborhood to mobilize the human and financial resources required to address many health and quality of life issues. The WHO program involves implementating city projects and networks in all regions of the world and serves as a vehicle for many health programs, including major disease control initiatives. Healthy City projects allow Ministries of Health to develop stronger partnerships with local government organizations (such as the Union of Local Authorities and its members, "Local Agenda 21" initiatives, and others). One focus for the program is the development of 'multi-'multi-city action plans' for major global priority issues, including AIDS, sanitation, women's health, and violence, to ensure that major public health programs are strengthened by wider community participation. It is recognized that city networking--at national, regional, and international levels--now must be better exploited by individual cities and municipalities to solve local health problems.

  12. 75 FR 19895 - Final Flood Elevation Determinations

    Science.gov (United States)

    2010-04-16

    ... CFR part 10, Environmental Consideration. An environmental impact assessment has not been prepared... Areas Docket No.: FEMA-B-1032 Beaver Dam Lake Entire shoreline +874 City of Beaver Dam, City of Fox Lake, Unincorporated Areas of Dodge County. Beaver Dam River Approximately 377 feet +841 City of Beaver Dam, downstream...

  13. FULCRUM - A dam safety management and alert system

    Energy Technology Data Exchange (ETDEWEB)

    Butt, Cameron; Greenaway, Graham [Knight Piesold Ltd., Vancouver, (Canada)

    2010-07-01

    Efficient management of instrumentation, monitoring and inspection data are the keys to safe performance and dam structure stability. This paper presented a data management system, FULCRUM, developed for dam safety management. FULCRUM is a secure web-based data management system which simplifies the process of data collection, processing and analysis of the information. The system was designed to organize and coordinate dam safety management requirements. Geotechnical instrumentation such as piezometers or inclinometers and operating data can be added to the database. Data from routine surveillance and engineering inspection can also be incorporated into the database. The system provides users with immediate access to historical and recent data. The integration of a GIS system allows for rapid assessment of the project site. Customisable alerting protocols can be set to identify and respond quickly to significant changes in operating conditions and potential impacts on dam safety.

  14. The behaviour of a large dam at severe frost

    Directory of Open Access Journals (Sweden)

    M. C. SPADEA

    1972-06-01

    Full Text Available Synthesizing the problem, the action of the thrusts in the
    behaviour of t h e dam of Pieve di Cadore, makes itself conspicuous expecially
    during three periods of the year:
    1. - About the end of June, the air temperature, 011 t h e average, overcomes
    the water one in the watershed upstream the dam: the bending of
    t h e dam upstream increases from the bottom to the top.
    2. - About the end of October, the thermal conditions change; the
    mean air temperature grows lower than the mean water temperature; the
    dam begins her bending dowstream.
    3. - When the air temperature is distinctly below 0 °C, the action of
    t h e t h r u s t s grows more complexe; t h e rocky waterlogged system downstream
    of t h e dam, while cooling, swells and pushes t h e bottom of t h e dam upstream;
    at t h e higher quote, on the contrary, the t h r u s t downstream continues.
    When the strenght limit of the medium is surpassed, arises a contrast
    between the rocky system and the concrete structure: this contrast can origin
    a t e very small fractures, revealed from seismic station installed into the
    central ashlar (XIV a t 660 metres height of t h e dam, under t h e form of microshocks
    which energy is of about 10I0-10U erg.

  15. The potential for dams to impact lowland meandering river floodplain geomorphology.

    Science.gov (United States)

    Marren, Philip M; Grove, James R; Webb, J Angus; Stewardson, Michael J

    2014-01-01

    The majority of the world's floodplains are dammed. Although some implications of dams for riverine ecology and for river channel morphology are well understood, there is less research on the impacts of dams on floodplain geomorphology. We review studies from dammed and undammed rivers and include influences on vertical and lateral accretion, meander migration and cutoff formation, avulsion, and interactions with floodplain vegetation. The results are synthesized into a conceptual model of the effects of dams on the major geomorphic influences on floodplain development. This model is used to assess the likely consequences of eight dam and flow regulation scenarios for floodplain geomorphology. Sediment starvation downstream of dams has perhaps the greatest potential to impact on floodplain development. Such effects will persist further downstream where tributary sediment inputs are relatively low and there is minimal buffering by alluvial sediment stores. We can identify several ways in which floodplains might potentially be affected by dams, with varying degrees of confidence, including a distinction between passive impacts (floodplain disconnection) and active impacts (changes in geomorphological processes and functioning). These active processes are likely to have more serious implications for floodplain function and emphasize both the need for future research and the need for an "environmental sediment regime" to operate alongside environmental flows.

  16. The Potential for Dams to Impact Lowland Meandering River Floodplain Geomorphology

    Directory of Open Access Journals (Sweden)

    Philip M. Marren

    2014-01-01

    Full Text Available The majority of the world's floodplains are dammed. Although some implications of dams for riverine ecology and for river channel morphology are well understood, there is less research on the impacts of dams on floodplain geomorphology. We review studies from dammed and undammed rivers and include influences on vertical and lateral accretion, meander migration and cutoff formation, avulsion, and interactions with floodplain vegetation. The results are synthesized into a conceptual model of the effects of dams on the major geomorphic influences on floodplain development. This model is used to assess the likely consequences of eight dam and flow regulation scenarios for floodplain geomorphology. Sediment starvation downstream of dams has perhaps the greatest potential to impact on floodplain development. Such effects will persist further downstream where tributary sediment inputs are relatively low and there is minimal buffering by alluvial sediment stores. We can identify several ways in which floodplains might potentially be affected by dams, with varying degrees of confidence, including a distinction between passive impacts (floodplain disconnection and active impacts (changes in geomorphological processes and functioning. These active processes are likely to have more serious implications for floodplain function and emphasize both the need for future research and the need for an “environmental sediment regime” to operate alongside environmental flows.

  17. National Dam Safety Program. Potake Lake Dam (Inventory Number N.Y. 970), Passaic River Basin, Lower Hudson River Area, Rockland County, New York. Phase I Inspection Report,

    Science.gov (United States)

    1981-08-14

    facilitate thedischarge of storm flows. 2. The animal burrows, depressions , and tire ruts onthe crest of the dam should be filled, compacted and seeded. 3...storm flows. 2. The animal burrows, depressions , and tire ruts on the crest of the dam should be filled, compacted, and seeded...defined by the Recommended Guidelines for Safety Inspection of Dams (Reference 13, Appendix D). d. Hazard Classifications - Cranberry Lake Dam is one mile

  18. a decade of african union and european union trans-regional

    African Journals Online (AJOL)

    Abel

    designed to link the African Union and the European Union in a process of trans- ... terrorism, drug and human trafficking and migration.5 The common value ..... have involved policing, rule of law, border assistance and monitoring and security .... Europe as exemplified by Russia and Ukraine (who provided helicopters and ...

  19. Dam failure analysis for the Lago de Matrullas Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Torres-Sierra, Heriberto; Gómez-Fragoso, Julieta

    2015-01-01

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed a hydrologic and hydraulic study to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago de Matrullas Dam, located within the headwaters of the Río Grande de Manatí. The hydrologic study yielded outflow hydrographs and peak discharges for Lago de Matrullas and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation (PMP) event, (2) a 24-hour PMP event, and (3) a 100-year-recurrence, 24-hour rainfall event. The hydraulic study simulated the hypothetical dam failure of Lago de Matrullas using hypothetical flood hydrographs generated from the hydrologic study and selected dam breach parameters. The flood wave resulting from the failure was downstream-routed through the lower reaches of the Río Matrullas, the Río Toro Negro, and the Río Grande de Manatí for determination of water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” (no precipitation) conditions. The Hydrologic Modeling System (HEC–HMS) and the River Analysis System (HEC–RAS) computer programs, developed by the Hydrologic Engineering Center (HEC) of the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was performed using the unsteady-state flow module available in the HEC–RAS model.

  20. Impact of dam-building on marine life

    Science.gov (United States)

    Pandian, T. J.

    1980-03-01

    Dam-building across naturally flowing rivers tends to decrease discharge of surplus water into the sea, reduce nutrient concentration in estuaries and coastal waters, and diminish plankton blooms as well as fish landings. Depletion of nutrients and organic matter along with reduced mud and silt deposition affect benthic life on the continental shelf. Reduced mud and silt deposition leads to coastal retreat. Dams, especially those constructed for hydro-electric purposes, hinder migration of fishes and decapods. Discharge from dams can create barriers at high or low flows, cause delays, disrupt normal behavioural routine and change the travel speed of migratory animals. Where all spawners of a given population are frequently kept away from the breeding site, the population faces extinction.

  1. DESIGN OF SLIT DAMS FOR CONTROLLING STONY DEBRIS FLOWS

    Institute of Scientific and Technical Information of China (English)

    Hui-Pang LIEN

    2003-01-01

    A new method to a slit dam for controlling the stony debris flow has been derived based on the mass conservation law of the stony debris flow passing through a slit dam and the laboratory experiment results.This new method is then combined with three primary efficiency expressions: the dimensionless sediment outflow ratio,the sediment concentration ratio,and the sediment storage rate to develop a simple module,with which the height and the spacing of the posts,as well as the total spacing of slit dam are determined.Furthermore,these expressions can also be applied to check those slit dams that have already been constructed with their effectiveness against various magnitudes of the debris flow. The comparison between these expressions and laboratory data is in reasonable agreement.

  2. Trade Union Cooperation in the EU: Views Among Swedish Trade Unions and Their Members

    Directory of Open Access Journals (Sweden)

    Bengt Furåker

    2013-09-01

    Full Text Available This article compares views among Swedish trade unions with those of their members regarding cross-national union cooperation in Europe or the EU. Data are derived from two different surveys, one among trade unions in 2010–2011 and the other among employees in 2006. It turns out that trade unions are generally more affirmative than their members to transnational union cooperation. In the employee survey, differences appear between members of the three peak-level organizations—the LO (manual workers, the TCO (white-collar workers, and Saco (professionals. However, controlling for education, these differences cannot be verified statistically. Higher education—which above all Saco members have—is linked to more positive attitudes toward transnational union cooperation. The gap between the organizations and their affiliates concerning engagement in European issues appears to be larger in the LO than in Saco, with the TCO somewhere in the middle.

  3. River Restoration by Dam Removal: Assessing Riverine Re-Connectivity Across New England

    Science.gov (United States)

    Magilligan, F. J.; Nislow, K. H.; Graber, B.; Sneddon, C.; Fox, C.; Martin, E.

    2014-12-01

    The impacts of dams in New England are especially acute as it possesses one of the highest densities of dams in the US, with the NID documenting more than 4,000 dams, and state agency records indicating that >14,000 dams are peppered throughout the landscape. This large number of dams contributes to pervasive watershed fragmentation, threatening the ecological integrity of rivers and streams, and in the case of old, poorly maintained structures, posing a risk to lives and property. These concerns have generated active dam removal efforts throughout New England. To best capture the geomorphic, hydrologic, and potential ecological effects of dam removal at a regional level, we have compiled a dataset of 127 removed dams in New England, which includes information about structural characteristics, georectified locations, and key watershed attributes (including basin size, distance to next upstream obstacle, and number of free-flowing river kms opened up). Our specific research questions address (1) what is the spatial distribution of removed dams and how does this pattern relate to stated management goals of restoring critical habitat for native resident freshwater and diadromous fish, (2) what are the structural or management commonalities in dam types that have been removed, and (3) what has been the incremental addition of free-flowing river length? Rather than reflecting an overall management prioritization strategy, results indicate that dam removals are characterized more by opportunistic removals. For example, despite a regional emphasis on diadromous fish protection and restoration, most removals are inland rather than coastal settings. Most of the removed dams were small (~ 45% 2,300 river kms over the past several decades, with implication for both resident and diadromous fish, and with many removals located in mid-sized rivers that are a key link between upstream and downstream/coastal aquatic ecosystems.

  4. The Role of Green Space in City Branding

    DEFF Research Database (Denmark)

    Gulsrud, Natalie Marie

    and globalization. Urban political ecology is applied as a critical lens. Findings indicate that green city branding discourses impact UGI governance arrangements both at the on-the-ground level of exploring concrete policy problems and their causes and solutions as well as at the meta-level in terms of framing...... diverse green city branding cases in Denmark, Singapore and the European Union. The case studies are analyzed and operationalized through an urban governance theoretical framework linking changes in policy practices such as urban greening to broader structural changes in society such as neoliberalism...... ideas about the relationships between state, market and civil society. Study findings contribute to urban green space management practices in Denmark and abroad as well as to the literature on urban green space governance....

  5. Calculating earth dam seepage using HYDRUS software applications

    Directory of Open Access Journals (Sweden)

    Jakub Nieć

    2017-06-01

    Full Text Available This paper presents simulations of water seepage within and under the embankment dam of Lake Kowalskie reservoir. The aim of the study was to compare seepage calculation results obtained using analytical and numerical methods. In April 1985, after the first filling of the reservoir to normal storage levels, water leaks was observed at the base of the escarpment, on the air side of the dam. In order to control seepage flow, drainage was performed and additional piezometers installed. To explain the causes of increased pressure in the aquifer under the dam in May 1985 a simplified calculation of filtration was performed. Now, on the basis of archived data from the Department of Hydraulic and Sanitary Engineering using 3D HYDRUS STANDARD software, the conditions of seepage under the dam have been recreated and re-calculated. Piezometric pressure was investigated in three variants of drainage, including drainage before and after modernization.

  6. Safety management of the Karapiro dam, New Zealand

    International Nuclear Information System (INIS)

    Everitt, S.C.

    1995-01-01

    The dam safety program for 36 hydraulic structures in New Zealand were presented, with special emphasis on the application of this program to the Karapiro dam. The management of the hazard presented by the dam was detailed, and the proposed solutions for its remediation were presented. Dynamic analysis was employed using an elastic 3-D finite element model, using actual earthquake time history records as an input, scaled to the required Maximum Credibility Earthquake (MCE). The results confirmed that the arch section of the Karapiro dam was satisfactory, as was the spillway block, provided that drainage was preserved, however, the left abutment and thrust block were considered unstable. Four options were proposed for strengthening the abutment: (1) lowering the groundwater, (2) installation of stresses anchors, (3) mass concrete buttressing upstream and/or downstream, and (4) installation of reinforced concrete shear keys. However, prior to undertaking any remediation work, rock mass properties and groundwater conditions should be re-investigated. 1 ref., 7 figs

  7. Optimizing hourly hydro operations at the Salt Lake City Area integrated projects

    International Nuclear Information System (INIS)

    Veselka, T.D.; Hamilton, S.; McCoy, J.

    1995-01-01

    The Salt Lake City Area (SLCA) office of the Western Area Power Administration (Western) is responsible for marketing the capacity and energy generated by the Colorado Storage, Collbran, and Rio Grande hydropower projects. These federal resources are collectively called the Salt Lake City Area Integrated Projects (SLCA/IP). In recent years, stringent operational limitations have been placed on several of these hydropower plants including the Glen Canyon Dam, which accounts for approximately 80% of the SLCA/IP resources. Operational limitations on SLCA/IP hydropower plants continue to evolve as a result of decisions currently being made in the Glen Canyon Dam Environmental Impact Statement (EIS) and the Power Marketing EIS. To analyze a broad range of issues associated with many possible future operational restrictions, Argonne National Laboratory (ANL), with technical assistance from Western has developed the Hydro LP (Linear Program) Model. This model simulates hourly operations at SLCA/IP hydropower plants for weekly periods with the objective of maximizing Western's net revenues. The model considers hydropower operations for the purpose of serving SLCA firm loads, loads for special projects, Inland Power Pool (IPP) spinning reserve requirements, and Western's purchasing programs. The model estimates hourly SLCA/IP generation and spot market activities. For this paper, hourly SLCA/IP hydropower plant generation is simulated under three operational scenarios and three hydropower conditions. For each scenario an estimate of Western's net revenue is computed

  8. Mapping the social impacts of small dams: The case of Thailand's Ing River basin.

    Science.gov (United States)

    Fung, Zali; Pomun, Teerapong; Charles, Katrina J; Kirchherr, Julian

    2018-05-24

    The social impacts of large dams have been studied extensively. However, small dams' social impacts have been largely neglected by the academic community. Our paper addresses this gap. We examine the social impacts of multiple small dams in one upstream and one downstream village in Thailand's Ing River basin. Our research is based on semi-structured interviews with beneficiaries, government and NGOs. We argue that small dams' social impacts are multi-faceted and unequal. The dams were perceived to reduce fish abundance and provide flood mitigation benefits. Furthermore, the dams enabled increased access to irrigation water for upstream farmers, who re-appropriated water via the dams at the expense of those downstream. The small dams thus engendered water allocation conflicts. Many scholars, practitioners and environmentalists argue that small dams are a benign alternative to large dams. However, the results of our research mandate caution regarding this claim.

  9. Feasibility of groundwater recharge dam projects in arid environments

    Science.gov (United States)

    Jaafar, H. H.

    2014-05-01

    A new method for determining feasibility and prioritizing investments for agricultural and domestic recharge dams in arid regions is developed and presented. The method is based on identifying the factors affecting the decision making process and evaluating these factors, followed by determining the indices in a GIS-aided environment. Evaluated parameters include results from field surveys and site visits, land cover and soils data, precipitation data, runoff data and modeling, number of beneficiaries, domestic irrigation demand, reservoir objectives, demography, reservoirs yield and reliability, dam structures, construction costs, and operation and maintenance costs. Results of a case study on more than eighty proposed dams indicate that assessment of reliability, annualized cost/demand satisfied and yield is crucial prior to investment decision making in arid areas. Irrigation demand is the major influencing parameter on yield and reliability of recharge dams, even when only 3 months of the demand were included. Reliability of the proposed reservoirs as related to their standardized size and net inflow was found to increase with increasing yield. High priority dams were less than 4% of the total, and less priority dams amounted to 23%, with the remaining found to be not feasible. The results of this methodology and its application has proved effective in guiding stakeholders for defining most favorable sites for preliminary and detailed design studies and commissioning.

  10. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  11. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  12. Examining the economic impacts of hydropower dams on property values using GIS.

    Science.gov (United States)

    Bohlen, Curtis; Lewis, Lynne Y

    2009-07-01

    While the era of dam building is largely over in the United States, globally dams are still being proposed and constructed. The articles in this special issue consider many aspects and impacts of dams around the world. This paper examines dam removal and the measurement of the impacts of dams on local community property values. Valuable lessons may be found. In the United States, hundreds of small hydropower dams will come up for relicensing in the coming decade. Whether or not the licenses are renewed and what happens to the dams if the licenses expires is a subject of great debate. Dams are beginning to be removed for river restoration and fisheries restoration and these "end-of-life" decisions may offer lessons for countries proposing or currently building small (and large) hydropower dams. What can these restoration stories tell us? In this paper, we examine the effects of dams along the Penobscot River in Maine (USA) on residential property values. We compare the results to findings from a similar (but ex post dam removal) data set for properties along the Kennebec river in Maine, where the Edwards Dam was removed in 1999. The Penobscot River Restoration Project, an ambitious basin-wide restoration effort, includes plans to remove two dams and decommission a third along the Penobscot River. Dam removal has significant effects on the local environment, and it is reasonable to anticipate that environmental changes will themselves be reflected in changes in property values. Here we examine historical real estate transaction data to examine whether landowners pay a premium or penalty to live near the Penobscot River or near a hydropower generating dam. We find that waterfront landowners on the Penobscot or other water bodies in our study area pay approximately a 16% premium for the privilege of living on the water. Nevertheless, landowners pay LESS to live near the Penobscot River than they do to live further away, contrary to the expectation that bodies of water

  13. Strategies of Successful Anti-Dam Movements: Evidence from Myanmar and Thailand

    NARCIS (Netherlands)

    Kirchherr, J.W.|info:eu-repo/dai/nl/411261487

    2018-01-01

    Scholars are rarely able to examine anti-dam movements that result in project suspensions or cancellations since these cases are rare empirically. Yet, they are central to understanding how anti-dam movements can succeed. This paper analyzes the movements against Myanmar’s Myitsone Dam and

  14. Evaluating temporal changes in hydraulic conductivities near karst-terrain dams: Dokan Dam (Kurdistan-Iraq)

    Science.gov (United States)

    Dafny, Elad; Tawfeeq, Kochar Jamal; Ghabraie, Kazem

    2015-10-01

    Dam sites provide an outstanding opportunity to explore dynamic changes in the groundwater flow regime because of the high hydraulic gradient rapidly induced in their surroundings. This paper investigates the temporal changes of the hydraulic conductivities of the rocks and engineered structures via a thorough analysis of hydrological data collected at the Dokam Dam, Iraq, and a numerical model that simulates the Darcian component of the seepage. Analysis of the data indicates increased seepage with time and suggests that the hydraulic conductivity of the rocks increased as the conductivity of the grout curtain decreased. Conductivity changes on the order of 10-8 m/s, in a 20-yr period were quantified using the numerical analysis. It is postulated that the changes in hydraulic properties in the vicinity of Dokan Dam are due to suspension of fine materials, interbedded in small fissures in the rocks, and re-settlement of these materials along the curtain. Consequently, the importance of the grout curtain to minimize the downstream seepage, not only as a result of the conductivity contrast with the rocks, but also as a barrier to suspended clay sediments, is demonstrated. The numerical analysis also helped us to estimate the proportion of the disconnected karstic conduit flow to the overall flow.

  15. Endocrine-disruptor molecular responses, occurrence of intersex and gonado-histopathological changes in tilapia species from a tropical freshwater dam (Awba Dam) in Ibadan, Nigeria

    International Nuclear Information System (INIS)

    Adeogun, Aina O.; Onibonoje, Kolawole; Ibor, Oju R.; Omiwole, Roseline A.; Chukwuka, Azubuike V.; Ugwumba, Alex O.; Ugwumba, Adiaha A.A.; Arukwe, Augustine

    2016-01-01

    Highlights: • Occurrence and severity of intersex in Nigerian aquatic environment. • Estrogenic and reproductive developmental effects of effluents from a University community. • Biomarker of endocrine disruption in fish from a developing country. • Relationship between estrogenic responses and sediment contaminants burden in a dam used for University domestic water supply and for fisheries. • Possible health consequences of environmental contamination - Abstract: In the present study, the occurrence of endocrine disruptive responses in Tilapia species from Awba Dam has been investigated, and compared to a reference site (Modete Dam). The Awba Dam is a recipient of effluents from University of Ibadan (Nigeria) and several other anthropogenic sources. A total of 132 Tilapia species (Sarotherodon malenotheron (n = 57 and 32, males and females, respectively) and Tilapia guineensis (n = 23 and 20, males and females, respectively)) were collected from June to September 2014. At the reference site, samples of adult male and female S. melanotheron (48 males and 47 females) and T. guineensis (84 males and 27 females) were collected. Gonads were morphologically and histologically examined and gonadosomatic index (GSI) was calculated. Hepatic mRNA transcriptions of vitellogenin (Vtg) and zona radiata protein (Zrp) genes were analyzed using validated RT-qPCR. Significant increase in Vtg and Zrp transcripts were observed in male tilapias from Awba Dam, compared to males from the reference site. In addition, male tilapias from Awba Dam produced significantly higher Vtg and Zrp mRNA, compared to females in June and July. However, at the natural peak spawning period in August and September, females produced, significantly higher Vtg and Zrp mRNA, compared to males. Fish gonads revealed varying incidence of intersex with a striking presence of two (2) pairs of testes and a pair of ovary in S. melanotheron from Awba Dam. The entire fish population examined at Awba Dam

  16. Endocrine-disruptor molecular responses, occurrence of intersex and gonado-histopathological changes in tilapia species from a tropical freshwater dam (Awba Dam) in Ibadan, Nigeria

    Energy Technology Data Exchange (ETDEWEB)

    Adeogun, Aina O.; Onibonoje, Kolawole; Ibor, Oju R.; Omiwole, Roseline A.; Chukwuka, Azubuike V.; Ugwumba, Alex O.; Ugwumba, Adiaha A.A. [Department of Zoology, University of Ibadan, Ibadan (Nigeria); Arukwe, Augustine, E-mail: arukwe@bio.ntnu.no [Department of Biology, Norwegian University of Science and Technology (NTNU), 7491 Trondheim (Norway)

    2016-05-15

    Highlights: • Occurrence and severity of intersex in Nigerian aquatic environment. • Estrogenic and reproductive developmental effects of effluents from a University community. • Biomarker of endocrine disruption in fish from a developing country. • Relationship between estrogenic responses and sediment contaminants burden in a dam used for University domestic water supply and for fisheries. • Possible health consequences of environmental contamination - Abstract: In the present study, the occurrence of endocrine disruptive responses in Tilapia species from Awba Dam has been investigated, and compared to a reference site (Modete Dam). The Awba Dam is a recipient of effluents from University of Ibadan (Nigeria) and several other anthropogenic sources. A total of 132 Tilapia species (Sarotherodon malenotheron (n = 57 and 32, males and females, respectively) and Tilapia guineensis (n = 23 and 20, males and females, respectively)) were collected from June to September 2014. At the reference site, samples of adult male and female S. melanotheron (48 males and 47 females) and T. guineensis (84 males and 27 females) were collected. Gonads were morphologically and histologically examined and gonadosomatic index (GSI) was calculated. Hepatic mRNA transcriptions of vitellogenin (Vtg) and zona radiata protein (Zrp) genes were analyzed using validated RT-qPCR. Significant increase in Vtg and Zrp transcripts were observed in male tilapias from Awba Dam, compared to males from the reference site. In addition, male tilapias from Awba Dam produced significantly higher Vtg and Zrp mRNA, compared to females in June and July. However, at the natural peak spawning period in August and September, females produced, significantly higher Vtg and Zrp mRNA, compared to males. Fish gonads revealed varying incidence of intersex with a striking presence of two (2) pairs of testes and a pair of ovary in S. melanotheron from Awba Dam. The entire fish population examined at Awba Dam

  17. Application of the Periodic Average System Model in Dam Deformation Analysis

    Directory of Open Access Journals (Sweden)

    Yueqian Shen

    2015-01-01

    Full Text Available Dams are among the most important hydraulic engineering facilities used for water supply, flood control, and hydroelectric power. Monitoring of dams is crucial since deformation might have occurred. How to obtain the deformation information and then judge the safe conditions is the key and difficult problem in dam deformation monitoring field. This paper proposes the periodic average system model and creates the concept of “settlement activity” based on the dam deformation issue. Long-term deformation monitoring data is carried out in a pumped-storage power station, this model combined with settlement activity is used to make the single point deformation analysis, and then the whole settlement activity profile is drawn by clustering analysis. Considering the cumulative settlement value of every point, the dam deformation trend is analyzed in an intuitive effect way. The analysis mode of combined single point with multipoints is realized. The results show that the key deformation information of the dam can be easily grasped by the application of the periodic average system model combined with the distribution diagram of settlement activity. And, above all, the ideas of this research provide an effective method for dam deformation analysis.

  18. Optimization design of foundation excavation for Xiluodu super-high arch dam in China

    Directory of Open Access Journals (Sweden)

    Qixiang Fan

    2015-04-01

    Full Text Available With better understanding of the quality and physico-mechanical properties of rocks of dam foundation, and the physico-mechanical properties and structure design of arch dam in association with the foundation excavation of Xiluodu arch dam, the excavation optimization design was proposed for the foundation surface on the basis of feasibility study. Common analysis and numerical analysis results demonstrated the feasibility of using the weakly weathered rocks III1 and III2 as the foundation surface of super-high arch dam. In view of changes in the geological conditions at the dam foundation along the riverbed direction, the design of extending foundation surface excavation area and using consolidating grouting and optimizing structure of dam bottom was introduced, allowing for harmonization of the arch dam and foundation. Three-dimensional (3D geomechanics model test and finite element analysis results indicated that the dam body and foundation have good overload stability and high bearing capacity. The monitoring data showed that the behaviors of dam and foundation correspond with the designed patterns in the construction period and the initial operation period.

  19. A progressive methodology for seismic safety evaluation of gravity dams

    International Nuclear Information System (INIS)

    Ghrib, F.; Leger, P.; Tinawi, R.; Lupien, R.; Veilleux, M.

    1995-01-01

    A progressive methodology for the seismic safety evaluation of existing concrete gravity dams was described. The methodology was based on five structural analysis levels with increasing complexity to represent inertia forces, dam-foundation and dam-interaction mechanisms, as well as concrete cracking. The five levels were (1) preliminary screening, (2) pseudo-static method, (3) pseudo-dynamic method, (4) linear time history analysis, and (5) non-linear history analysis. The first four levels of analysis were applied for the seismic safety evaluation of Paugan gravity dam (Quebec). Results showed that internal forces from pseudo-dynamic, response spectra and transient finite element analyses could be used to interpret the dynamic stability of dams from familiar strength-based criteria. However, as soon as the base was cracked, the seismically induced forces were modified, and level IV analyses proved more suitable to handle rationally these complexities. 8 refs., 7 figs., 1 tab

  20. Dam-Break Flood Analysis Upper Hurricane Reservoir, Hartford, Vermont

    National Research Council Canada - National Science Library

    Acone, Scott

    1995-01-01

    .... Various dam break flood conditions were modeled and inundation maps developed. Based on this analysis the dam is rated a Class 2 or significant hazard category in terms of its potential to cause downstream damage...

  1. Review Article: Numerical analysis of the seismic behaviour of earth dam

    Directory of Open Access Journals (Sweden)

    Y. Parish

    2009-03-01

    Full Text Available The present study concerns analysis of the seismic response of earth dams. The behaviour of both the shell and core of the dam is described using the simple and popular non associated Mohr-Coulomb criterion. The use of this constitutive model is justified by the difficulty to obtain constitutive parameters for more advanced constitutive relations including isotropic and kinematic hardening. Analyses with real earthquake records show that the seismic loading induces plasticity in a large part of the shell and in the lower part of the core. Analysis shows that plasticity should be considered in the analysis of the seismic response of the dam, because it leads to a decrease in the natural frequencies of the dam together to energy dissipation, which could significantly affect the seismic response of the dam. Plastic analysis constitutes also a good tool for the verification of the stability of the dam under seismic loading.

  2. Potential Risk Analysis of Tailings Dam under Preloading Condition and Its Countermeasures

    Directory of Open Access Journals (Sweden)

    Shuren Wang

    2015-01-01

    Full Text Available It is very important for mine production safety to ensure the stability of the tailings dam. Taking a flatland tailings pond as the background, a threedimensional computational model was built based on a tailings dam under mullock heap preloading condition. Considering the current operating water level conditions, a liquid-solid coupling analysis of the model was conducted.The deformation characteristics of the tailings dam were revealed during successive preloading at the front of the dam. The safety factor and the potential slide face of the tailings dam were calculated under different conditions using the strength reduction method. The results show that the tailings dam in its current condition is basically stable, but if the mullock heap continues to be heightened, the tailings dam will become unstable. Therefore, in order to limit the height of the mullock heap, establishing a monitor and early warning mechanism are put forward to ensure mine production safety.

  3. Seismic rehabilitation and analysis of Chaohe earth dam

    Science.gov (United States)

    Fu, Lei; Zeng, Xiangwu

    2005-12-01

    Stability of earth dams during earthquakes has been a major concern for geotechnical engineers in seismic active regions. Liquefaction induced slope failure occurred at the upstream slope of a major earth dam in the suburb of Beijing, China, during the 1976 Tangshan Earthquake. The gravelly soil with loose initial condition liquefied under relatively small ground vibration. In recent years, a major seismic rehabilitation project was carried out on a similar earth dam nearby using dumped quarry stone. Seismic stability analysis was carried out using model test, finite element simulation, and pseudo-static slope stability program after taking into account the influence of excess pore pressure.

  4. Towards an urban planners’ perspective on Smart City

    Directory of Open Access Journals (Sweden)

    Rocco Papa

    2013-04-01

    Full Text Available The concept of “Smart City”, providing a solution for making cities more efficient and sustainable, has been quite popular in recent years, encouraging reflections, ideas, researches and projects for a “smart” urban development. A smart city is generally meant as a city capable of joining “competitiveness” and “sustainability”, by integrating different dimensions of development and addressing infrastructural investments able to support economic growth as well as the quality of life of communities, a more careful management of natural resources, a greater transparency and participation to decision-making processes. Based on those assumptions, this contribution tackle the controversial subject of Smart City, starting from the review of the scientific Italian and international literature that, from the Eighties to the Nineties, has been largely focused on ICTs and their impacts on urban development. Then, the focus shifts on the large debate on smart cities that has been developing from the beginning of 2000s and on the numerous institutional initiatives up to now implemented by the European Union for building up the Smart City. Finally, the article highlights how, despite these efforts, a shared definition of the term is still missing and current approaches to the issue are still very heterogeneous; it emphasizes, on the opposite, the key-role that urban planning, grounding on a holistic approach to cities’ development, should play in coordinating and integrating urban policies addressed to building up a Smart City.

  5. Endocrine-disruptor molecular responses, occurrence of intersex and gonado-histopathological changes in tilapia species from a tropical freshwater dam (Awba Dam) in Ibadan, Nigeria.

    Science.gov (United States)

    Adeogun, Aina O; Onibonoje, Kolawole; Ibor, Oju R; Omiwole, Roseline A; Chukwuka, Azubuike V; Ugwumba, Alex O; Ugwumba, Adiaha A A; Arukwe, Augustine

    2016-05-01

    In the present study, the occurrence of endocrine disruptive responses in Tilapia species from Awba Dam has been investigated, and compared to a reference site (Modete Dam). The Awba Dam is a recipient of effluents from University of Ibadan (Nigeria) and several other anthropogenic sources. A total of 132 Tilapia species (Sarotherodon malenotheron (n=57 and 32, males and females, respectively) and Tilapia guineensis (n=23 and 20, males and females, respectively)) were collected from June to September 2014. At the reference site, samples of adult male and female S. melanotheron (48 males and 47 females) and T. guineensis (84 males and 27 females) were collected. Gonads were morphologically and histologically examined and gonadosomatic index (GSI) was calculated. Hepatic mRNA transcriptions of vitellogenin (Vtg) and zona radiata protein (Zrp) genes were analyzed using validated RT-qPCR. Significant increase in Vtg and Zrp transcripts were observed in male tilapias from Awba Dam, compared to males from the reference site. In addition, male tilapias from Awba Dam produced significantly higher Vtg and Zrp mRNA, compared to females in June and July. However, at the natural peak spawning period in August and September, females produced, significantly higher Vtg and Zrp mRNA, compared to males. Fish gonads revealed varying incidence of intersex with a striking presence of two (2) pairs of testes and a pair of ovary in S. melanotheron from Awba Dam. The entire fish population examined at Awba Dam showed a high prevalence of intersex (34.8%), involving phenotypic males and females of both species. Analysis of sediment contaminant levels revealed that As, Cd, Pb, Hg and Ni (heavy metals), monobutyltin cation, 4-iso-nonyphenol and PCB congeners (138, 153 and 180) were significantly higher in Awba Dam, compared to the reference site. Principal component analysis (PCA) showed that fish variables were positively correlated with sediment contaminant burden at Awba Dam, indicating

  6. Watershed restoration: planning and implementing small dam removals to maximize ecosystem services

    Science.gov (United States)

    Tonitto, C.; Riha, S. J.

    2016-12-01

    River restoration and enhancing watershed connectivity is of growing concern in industrialized nations. The past two decades have seen a number of small dam removals, though many removals remain unstudied and poorly documented. We summarize socio-economic and biophysical lessons learned during the past two decades of accelerated activity regarding small dam removals throughout the United States. We present frameworks for planning and implementing removals developed by interdisciplinary engagement. Toward the goal of achieving thorough dam removal planning, we present outcomes from well-documented small dam removals covering ecological, chemical, and physical change in rivers post-dam removal, including field observation and modeling methodologies. Guiding principles of a dam removal process should include: 1) stakeholder engagement to navigate the complexity of watershed landuse, 2) an impacts assessment to inform the planning process, 3) pre- and post-dam removal observations of ecological, chemical and physical properties, 4) the expectation that there are short- and long-term ecological dynamics with population recovery depending on whether dam impacts were largely related to dispersion or to habitat destruction, 5) an expectation that changes in watershed chemistry are dependent on sediment type, sediment transport and watershed landuse, and 6) rigorous assessment of physical changes resulting from dam removal, understanding that alteration in hydrologic flows, sediment transport, and channel evolution will shape ecological and chemical dynamics, and shape how stakeholders engage with the watershed.

  7. PRODUCTIVITY COMPARISON BETWEEN BOER AND KACANG GOAT DAM

    Directory of Open Access Journals (Sweden)

    S. Elieser

    2014-10-01

    Full Text Available A study to evaluate the productivity of Boer and Kacang goats dam was carried out for 2 years atResearch Institute for Goat Production, Sungei Putih-North Sumatera. The materials used were goatsowned by the institute. The parameters observed were total birth and weaning weights of kid, litter size,parity of dam, pre-weaning mortality and kidding interval. The rate of reproduction and productivity ofthe dam were estimated using Amir and Knipscheer methods and were statistically analyzed usingGeneral Linear Model. The results showed that the total birth and weaning weight of Boer goats werehigher (P<0.05 than that of Kacang goats, while litter size of Boer goats were higher (P<0.05 than thatof Kacang goats. The pre-weaning mortality of Boer goat 15.1 ± 6.02% was lower than that ofKacang. The kidding interval of Boer goats was higher (P<0.05 than that of Kacang. Parity of dam hadsignificant effect on all production traits (P<0.05 except for pre-weaning mortality. Dam reproductionrate of Boer (1.81 was higher than that of Kacang (1.78, while productivity of Boer goat (37.12kg/head/year was higher than that of Kacang (18.12. It can be concluded that the reproductivity ofBoer and Kacang goats were similar, however the productivity of Boer goat had better than Kacang.

  8. Dams. Bulletin of the Technical Service of Electric Power and Big Dams; Barrages. Bulletin du Service Technique de l`Energie Electrique et des Grands Barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Three papers were selected in this issue of the bulletin of the Technical Service of Electric Power and Big Dams. The first one concerns the experience feedback gained from the accident of the Drac river near Grenoble (France) due to a spillover at the Notre-Dame-de-Commiers` dam and which led to the death of 6 children and their teacher. The second one is a report of the conclusions of decennial and annual safety inspections of French dams, while the third one is a report of the Control Services activities for the third quarter of the year 1996 concerning the French dams in operation. (J.S.)

  9. Linking Three Gorges Dam and downstream hydrological regimes along the Yangtze River, China

    NARCIS (Netherlands)

    Mei, X.; Dai, Z.; Van Gelder, P.H.A.J.M.; Gao, J.

    2015-01-01

    The magnitude of anthropogenic influence, especially dam regulation, on hydrological system is of scientific and practical value for large river management. As the largest dam in the world by far, Three Gorges Dam (TGD) is expected to be a strong evidence on dam impacts on downstream hydrological

  10. A note on the Sumerian expression SI-ge4-de3/dam

    Directory of Open Access Journals (Sweden)

    Widell, Magnus

    2002-12-01

    Full Text Available The expression SI-ge4-dam/de3 appears in some of the loan documents of the Ur III period where it was used to establish the interest rate or the loan fee. In addition, it is sometimes preceded by ki-ba 'in its/this place/ground' or, in some cases, ma2 -a 'in the boat'. The regular verb SI.g was closely related, perhaps even synonymous with, the reduplication verb ḡar/ḡa2-ḡa2 'to put' or 'to place'. While it may be concluded that SI-ge4-dam/de3 had nothing to do with the verb si 'to fill' or gi4 'to return', the correct analysis of the expression remains somewhat uncertain. The article proposes that the SI should be read se and understood as a phonetic writing for the regular verb se3.g 'to put', 'to place'. The combination of the verb with the ki-ba may suggest that a more parochial form of keeping products existed side by side with the large centralized granaries and storehouses of the city.La expresión SI-ge4-dam/de3 aparece en algunos contratos de préstamo del período de Ur III, donde se empleaba para determinar el interés de dicho préstamo. Por otra parte, este término se hallaba a veces precedido de ki-ba 'en su/este lugar/suelo', y en algunos casos por ma2 -a 'en la barca'. El verbo regular SI.g está muy relacionado (quizás es incluso sinónimo con el verbo de la clase de la reduplicación ḡar/ḡa2-ḡa2 'poner' o 'colocar'. Mientras que puede concluirse que SI-ge4-dam/de3 no tiene nada que ver con el verbo si 'llenar', ni con gi4 'regresar, devolver', el análisis correcto de la expresión sigue siendo, de algún modo, incierto. En el artículo se propone que SI puede leerse como se , entendiéndolo como una escritura fonética del verbo regular se3.g 'poner', 'colocar'. La combinación del verbo con ki-ba podría indicar que, junto a los grandes graneros y almacenes centrales de la ciudad, había un modo distinto y más modesto de conservar los productos.

  11. Freshwater mussel survey for the Columbia Dam removal, Paulins Kill, New Jersey

    Science.gov (United States)

    Galbraith, Heather S.; Blakeslee, Carrie J.; Cole, Jeffrey C.; Silldorff, Erik L.

    2018-06-04

    Semi-quantitative mussel surveys, conducted by the U.S. Geological Survey and the Delaware Riverkeeper Network in cooperation with The Nature Conservancy, were completed in the vicinity of the Columbia Dam, on the Paulins Kill, New Jersey, in August 2017 in order to document the mussel species composition and relative abundance prior to removal of the dam. Surveys were conducted from the Brugler Road Bridge downriver approximately 2,000 meters (m) to the Columbia Dam and downriver from the dam about 300 m to 75 m upriver from the confluence of the Paulins Kill with the Delaware River. Sixteen sections (average length=175 m) were surveyed by personnel snorkeling or SCUBA diving; 13 sections were upriver from the dam, and 3 were downriver from the dam. Mussels, as they were encountered by surveyors, were removed from the sediment, immediately identified to species, and replaced in their original collection locations. Habitat data were collected for each surveyed section. Upriver and downriver from the dam, river margins with dense vegetation were examined for mussels by personnel using snorkels in transects (approximately 25 meters) perpendicular to river flow every 50 m on both sides of the river. Only two species were found upriver from the dam, and those were present in relatively low numbers. Catch per unit effort is reported here within parentheses as the average across upriver sections in number of mussels per person hour of survey time: 42 Elliptio complanata (2.6) and 1 Pyganodon cataracta (0.1) were found upriver from the dam. No mussels were found in the dense vegetation either upriver or downriver of the dam by surveyors using snorkels. Significantly higher species richness and mussel catch per unit effort were found downriver from the dam than upriver, including 106 E. complanta (32.5), 27 Utterbackiana implicata (8.2), 1 Alasmidonta undulata (0.4), 2 Lampsilis cariosa (0.5), 6 Lampsilis radiata (2.1), 4 P. cataracta (1.1), and 1 Strophitus undulatus (0

  12. Variability of Ecosystem State in Rivers Containing Natural Dams: A Chemical Analysis

    Science.gov (United States)

    Reynolds, Z. A.

    2015-12-01

    Flooding, and the resulting economic damage to roads and property, is associated with natural dams such as beaver dams or log jams. For this reason, humans often remove natural dams; however, river reaches with natural dams provide very different ecosystem services in comparison with free-flowing river reaches. Therefore, the goal of this project is to assess the differences in ecosystem state between these different river reach types in the northeastern United States. We focused on differences in basic chemistry (e.g., dissolved oxygen, pH, temperature, and organic carbon) to assess the impact of natural dams on river ecosystem state. Study sites include rivers in the White Mountains and southeastern New Hampshire at locations with beaver dams, beaver ponds, beaver meadows, log jams, and free-flowing reaches. Dissolved oxygen, ORP, pH, temperature, and conductivity were measured in the field with a YSI Professional Plus meter. Water samples were collected for subsequent laboratory analysis of total organic carbon with a Shimadzu TOC-L. Preliminary results show that the chemistry of river water varies with feature type. Most significantly, dissolved oxygen concentrations are highest in free-flowing reaches and lowest in beaver ponds. Although beaver ponds are often associated with lower pH, due the increased concentration of organic acids, some beaver ponds can increase pH when compared to free-flowing reaches on the same river. Early results also show that water chemistry returns quickly to the chemistry typical of the free-flowing river reaches after being altered by a natural dam. Overall, natural dams create a river system that has more heterogeneity, and therefore has opportunities to provide more ecosystem functions, than a purely free-flowing river; this can increase the number of supported instream and riparian species. By increasing the understanding of how natural dams affect the chemistry of river water, river engineers can improve their decisions on how

  13. Risk assessment of tailings facility dam failure

    OpenAIRE

    Hadzi-Nikolova, Marija; Mirakovski, Dejan; Stefanova, Violeta

    2011-01-01

    This paper presents the consequences of tailings facility dam failure and therefore the needs for its risk assessment. Tailings are fine-grained wastes of the mining industry, output as slurries, due to mixing with water during mineral processing. Tailings dams vary a lot as it is affected by: tailings characteristics and mill output, site characteristics as: topography, hydrology, geology, groundwater, seismicity and available material and disposal methods. The talings which accumulat...

  14. Geoelectrical Methods and Monitoring for Dam Safety Assessment, Republic of Korea

    Science.gov (United States)

    Lim, S. K.; Oldenburg, D.; Kang, S.; Song, S. H.

    2016-12-01

    Geoelectrical methods and monitoring to detect the seepage and internal erosion are essential for the safety assessment of earth dams. This work aims to develop improved methodologies to analyze the observed data and to monitor changes in seepage flow using direct current (DC) and self-potential (SP) methods. The seasonal variation of water level at dams causes a change in seepage and water saturation and hence alters the resistivity of the dam material. DC data are sensitive to water saturation and hence changes in saturation can be obtained by repeatedly measuring DC data. However, a more diagnostic parameter for safety assessment is fluid flow, and resistivity is only weakly coupled to that. Fortunately SP signals are directly related to fluid flow, and thus an SP survey has the potential to characterize fluid flow through the earth matrix. In Korea, the safety assessment of earth fill dams has been dealt by Korea Rural Community Corporation (KRC). Most of the dams are relatively old ( >50 years), hence assessing deterioration and corresponding seepage of those dams are crucial. In order to evaluate the engineering geological properties of the soil at earth dams in Korea, two boreholes in each dam were drilled to a bedrock depth that exceeds the height of the dam. A large set of field tests, including standard penetration tests (SPT) and in-situ permeability tests, were carried out along the boreholes. However, seepage paths in the dam is complex hence those limited measurements at a few points is not sufficient to delineate the zone of preferential seepage flow. For this, KRC developed permanent DC monitoring systems at a number of agricultural dams in Korea. The data were automatically collected every 6 hours. During the monitoring, the measurements of the water level at two boreholes were gathered at the same time. In this presentation we select an agricultural dam and delineate an anomalous leakage zone by inverting and interpreting time-lapse DC resistivity

  15. Evaluating the Mosul Dam's Instability after Resumption of Maintenance

    Science.gov (United States)

    Al-husseinawi, Y.; Li, Z.; Clarke, P. J.; Edwards, S.

    2017-12-01

    There is serious concern about the safety of Mosul dam in the north of Iraq. Millions of people in the downstream area are exposed to risk of catastrophic collapse of this dam due to its soluble foundation. Recent study (Milillo et al., 2016, Scientific Report/10.1038/srep37408) reported that the dam deformation has accelerated since August 2014, when grouting operations were interrupted due to the conflict in the region. In this study, we investigate the health of Mosul dam since Jun 2016 using three independent datasets: Sentinel-1A/B SAR images, levelling, and GPS measurement. The latter are based on three epochs of terrestrial observation for levelling and GPS data: March 2016, December 2016 and July 2017. During this period, maintenance operations are being recovered to keep the dam stable. The monitoring network, on which the levelling and GPS observations are based, consists of eighty-seven pillars distributed on the dam surface. The results from InSAR and leveling data show that the dam crest is settling by 9 mm/yr. In contrast to previous studies, our results show a deceleration in the settlement. This may be due to the maintenance operations performed in the last few months. InSAR time series analysis was performed using the in-house tool TM-SBAS. When using the small baseline Sentinel-1 constellation, all possibilities of image choice are taken into consideration and the SRTM DEM accuracy is sufficient to generate the differential interferograms. Data from both Sentinel-1A and -1B images are used, and these results can be compared with multi-platform (Envisat, Sentinel-1, Cosmo-SkyMed, and TerraSar-X) data collected during the period between March 2003 and September 2016.

  16. 5. decennial inspection of Tignes dam. Draining of the higher french dam; 5. inspection decennale du barrage de Tignes. Vidange du plus haut barrage de France

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This document deals with the 5. decennial inspection of the Tignes dam. The Tignes dam has been drained to allow EDF and the public authorities to verify the dam wall, of 180 m high, in order to validate the next decade. The four steps of the drainage are described as the maintenance policy of such building. (A.L.B.)

  17. Expansion at Olympic Dam

    International Nuclear Information System (INIS)

    Lewis, C.

    1997-01-01

    The Olympic Dam orebody is the 6th largest copper and the single largest uranium orebody in the world. Mine production commenced in June 1988, at an annual production rate of around 45,000 tonnes of copper and 1,000 tonnes of uranium. Western Mining Corporation announced in 1996 a proposed $1.25 billion expansion of the Olympic Dam operation to raise the annual production capacity of the mine to 200,000 tonnes of copper, approximately 3,700 tonnes of uranium, 75,000 ounces of gold and 950,000 ounces of silver by 2001. Further optimisation work has identified a faster track expansion route, with an increase in the capital cost to $1.487 billion but improved investment outcome, a new target completion date of end 1999, and a new uranium output of 4,600 tonnes per annum from that date

  18. Why do people join trade unions?

    DEFF Research Database (Denmark)

    Toubøl, Jonas; Jensen, Carsten Strøby

    level on union recruitment, which is not done before. Workplace union density is taken to measure the strength of the workplace’s custom of being union member creating an instrumental incentive to join the union. Self-placement on a political left-right scale measures political attitude taken...

  19. The Adapting city. Resilience through water design in Rotterdam

    Directory of Open Access Journals (Sweden)

    Maurizio Francesco Errigo

    2018-04-01

    Full Text Available The Netherlands is a fragile and vulnerable land; dutch landscape consists of a dense network of polders characterized by key elements such as dams, windmills and farms; it is a unique landscape but, at the same time, is very fragile and constantly changing; spatial planning is very important, just as important is the resilience of the system and its adaptation to climate change. Rotterdam is a delta city and, in a period of heavy climate change, it will experiment more extreme weather conditions, such as heavier rainstorms, longer periods of drought and more heat waves, as well as higher water levels in the river Meuse; so is important to know that it is a deep vulnerable city and need right strategies to overcome the problem and to be adapted to conseguences of climate change. Resilience has been under the attention of the municipality for about fifteen years; Rotterdam is the inspiring example to other delta cities around the world going through a sustainability approach; as a green city is an attractive and resilient city where people love to live, work and relax; sustainability is an integral part of all area development projects in Rotterdam; sustainable areas are future-proof areas with good living conditions. In Rotterdam, architects and urban designers are finally responding to the threats of rising sea levels by "welcoming the water" into city, so the waterscape is becoming a new paradigm of spatial planning; Rotterdam is striving to become a climate proof city that will be safe and attractive to inhabitants, visitors and businesses, and will remain so in the future. A healthy delta city in which it is pleasant to live, work and spend leisure time.

  20. WAC Bennett Dam - the characterization of a crest sinkhole

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, R.A.; Gaffran, P.C. [British Columbia Hydro, Burnaby, BC (Canada); Watts, B.D. [Klohn-Crippen Consultants Ltd., Richmond, BC (Canada); Sobkowicz, J.C. [Thurber Engineering Ltd., Vancouver, BC (Canada); Kupper, A.G. [AGRA Earth and Environmental, Edmonton, AB (Canada)

    1998-11-01

    In June, 1996, a small hole was discovered in the asphaltic concrete road on the crest of the 183 m high WAC Bennett Dam on the Peace River in northeastern British Columbia. Examination of the hole resulted in a sinkhole on the dam crest. The sinkhole was 2.5 m in diameter and 7 m deep. Speculation was that the cavity was likely associated in some way with a buried survey benchmark tube. An investigation was immediately planned and executed to characterize the sinkhole, to determine the extent of damage and the safety status of this very large dam. British Columbia`s Dam Safety Regulator made the decision to lower the reservoir level. During the reservoir drawdown, various surface geophysical techniques were used to investigate the condition of the dam beyond the sinkholes. Intrusive investigations of the sinkhole were also planned. This involved trial drilling and downhole geophysical surveys in intact portions of the core at locations far from the sinkhole. The objectives and criteria developed for the investigation program are summarized. Scope of key activities at the sinkhole and important lessons learned during the investigation are also described. 9 refs., 15 figs.

  1. Feasibility study for Boardman River hydroelectric power. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-22

    The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

  2. Characteristics of transplacental lead transfer in rat dams and fetuses

    International Nuclear Information System (INIS)

    Kopfler, F.C.; Miller, R.G.; Kowal, N.E.; Kelty, K.C.; Doerger, J.U.; Mills, T.

    1987-01-01

    This study was designed to quantitate the dose resulting from lead exposure during the critical periods of brain development during gestation by determining: (1) if blood lead concentration in rat dams is affected by pregnancy status or duration of lead exposure, (2) if lead concentration in fetuses is associated with the duration of dam exposure, (3) the rates of lead absorption and elimination in pregnant and nonpregnant dams; and (4) the effect that prebreeding exposure on lead kinetics in the dam and upon fetus blood lead concentrations. The results of experiments in which the dams' drinking water contained 50 mg/L lead indicate blood lead levels (after normalizing by water consumption on a body weight basis) of pregnant rats are significantly higher than blood lead levels of non-pregnant rats. Statistical differences in blood lead levels were observed by day 15 of gestation and continue through day 20 of gestation. These blood lead differences are not due to lead treatment prior to breeding as seen when comparing Figure 1 and Figure 2. The blood lead levels of the fetuses at day 20 of gestation were 50-60% higher than that of the corresponding dams. The results from the latter two phases were ambiguous, due to large variability in individual animal absorption and elimination rates. However, the following observations can be made. Preexposure to lead does not affect the percent of lead transferred from the dams' blood to the fetuses. The rate of elimination of lead from the dams' blood does not appear to be affected by prebreeding exposure to lead or by the status of pregnancy. The fraction of the 203 Pb dose transferred to the fetus increases dramatically toward the end of gestation. The data suggest that lead absorption from the gut of pregnant rats is higher than that for nonpregnant rats

  3. Influence of check dams on debris-flow run-out intensity

    Directory of Open Access Journals (Sweden)

    A. Remaître

    2008-12-01

    Full Text Available Debris flows are very dangerous phenomena claiming thousands of lives and millions of Euros each year over the world. Disaster mitigation includes non-structural (hazard mapping, insurance policies, active structural (drainage systems and passive structural (check dams, stilling basins countermeasures. Since over twenty years, many efforts are devoted by the scientific and engineering communities to the design of proper devices able to capture the debris-flow volume and/or break down the energy. If considerable theoretical and numerical work has been performed on the size, the shape and structure of check dams, allowing the definition of general design criteria, it is worth noting that less research has focused on the optimal location of these dams along the debris-flow pathway.

    In this paper, a methodological framework is proposed to evaluate the influence of the number and the location of the check dams on the reduction of the debris-flow intensity (in term of flow thickness, flow velocity and volume. A debris-flow model is used to simulate the run-out of the debris flow. The model uses the Janbu force diagram to resolve the force equilibrium equations; a bingham fluid rheology is introduced and represents the resistance term. The model has been calibrated on two muddy debris-flow events that occurred in 1996 and 2003 at the Faucon watershed (South French Alps.

    Influence of the check dams on the debris-flow intensity is quantified taking into account several check dams configurations (number and location as input geometrical parameters. Results indicate that debris-flow intensity is decreasing with the distance between the source area and the first check dams. The study demonstrates that a small number of check dams located near the source area may decrease substantially the debris-flow intensity on the alluvial fans.

  4. Intergarted geophysical investigations by GPR and ERT on the largest rock fill dam in Europe: Monte Cotugno dam (Southern Italy)

    Science.gov (United States)

    Loperte, A.; Bavusi, M.; Cerverizzo, G.; Lapenna, V.; Soldovieri, F.

    2012-04-01

    This work is concerned with the first results of a survey based on the integration of geophysical techniques for the inspection of the Monte Cotugno dam, the largest rock fill dam in Europe. The Monte Cotugno dam, managed by National Irrigation Development and Agrarian Transformation in Puglia, Basilicata and Irpinia is located on the Sinni river (Basilicata District, South Italy) and represents the nodal point in the whole hydraulic system on the Ionic side of Italy; in fact, the dam allows harnessing of the Sinni river water for agricultural, industrial, drinking and domestic purposes. The dam is of the zoned type and consists of a central core in sandy silt and of gravelly-sandy shoulders; its water tightness is ensured by a bituminous conglomerate facing on the upstream side, welded at the bottom to the foundation sealing system. The latter is about 1,900m long and consist of a massive concrete cut-off wall based on the marly-clay formation, 300m long on the right and 600 m long on the left side. On the valley bottom it is made up of a reinforced concrete cut-off wall that is inserted in the marly-clay formation and is surmounted by an inspection and percolation water collection tunnel. The watertight face consists of a bottom levelling layer 7-8 cm thick in semi open-graded bituminous concrete, a 5 cm separation layer in dense-graded bituminous concrete, a drainage layer in very open-graded concrete varying in thickness from 10 to 16 cm from the top of the dam down, two 4-cm top layers in dense-graded bituminous concrete with stepped joints, a finishing sealing coat containing 1.5 kg/cm2 of asphalt. The shallowest part of this layering is started to show incipient small detachments due to thermal solicitations; these detachments represent a possible way for water infiltration in the dam. In this framework, it was decided to perform the identification, characterization and evaluation of the potential loss of water through small cracks in the bituminous concrete

  5. Revitalizing the Malaysian Trade Union Movement

    DEFF Research Database (Denmark)

    Wad, Peter

    2012-01-01

    The article takes an historic perspective on contemporary issues of trade union revival in Malaysia, focusing on the challenge of raising union density and analysing the process of organizing employees in the strategically important electronics industry. It concludes that the political support...... for transnational corporations in the electronics industry is declining. This strategic shift enables union activists to bypass enterprise and state-based unions and to establish larger, regionally based unions. However, newly organized unions have not yet overcome resistance from global corporations, nor have...... organizations prefer non-partisan engagement. In order to revitalize themselves, the unions must demonstrate to the Malaysian public that they are both relevant and important for increased productivity and that they can play a significant role in enabling Malaysia to move beyond the middle-income ‘trap’ towards...

  6. Investigation of seepage under the Wenxiakou dam using radiotracer

    International Nuclear Information System (INIS)

    Li Zhangsu

    1988-01-01

    This paper describes the result of seepage observation on the dam foundation of Wenxiakou Reservoir using radioactive NaI (I-131) as a tracer. The main feature of the observing technique is to ascertain the seepages between the dam foundation and the clay core wall and around the abutment by measuring vertical flow. The results obtained from the observation have provided some important information for planning the engineering project of anti-seepage and reinforcement of the dam foundation and its right abutment. (author). 2 refs, 4 figs, 1 tab

  7. Skyscraper dams in Yunnan : China's new electricity generator should step in

    Energy Technology Data Exchange (ETDEWEB)

    Ryder, G.

    2006-05-12

    The construction of a series of high-head hydroelectric power dams in China's earthquake-prone Yunnan province has raised concerns in China's scientific and environmental communities. The series of skyscraper-high dams are being built to meet Beijing's power production targets without the benefit of market discipline or effective regulatory oversight. Dam building is central to Beijing's plan for tripling the country's hydropower production by 2020. To meet that target, the State Council granted exclusive development rights to Hydrolancang, the Yunnan Huadian Nu River Hydropower Development Company and the Three Gorges Corporation. The Hydrolancang company is building 2 of the world's tallest and most controversial hydro dams on the Lancang River. When completed in 2012, Xiaowan will be the world's tallest arch dam at 292 metres high. Another dam, the 254 metre high Nuozhadu dam is expected to start generating power in 2017. In addition, there are plans for 13 other high dams along the Nu River, one of only 2 major rivers in China that remains free-flowing. This document expressed that China's new electricity regulator should initiate a full-cost review of state dam-building in the earthquake-prone province. It was argued that as state-owned power companies, the dam builders are not market-driven and are shielded from many of the financial risks and environmental liabilities associated with large dams. The author argued that China's electricity regulator should examine the dam builders' projects costs and profits and review the economic implications of the hydro policy for China's power consumers. It was also suggested that the country's modernization goals for the power industry should be reviewed. The immediate concerns are ecological damage and the frequency with which Yunnan province is hit by earthquakes, rock falls and landslides. Experts caution that the extra weight of the high dams and reservoirs

  8. The Influence of Dams on Malaria Transmission in Sub-Saharan Africa.

    Science.gov (United States)

    Kibret, Solomon; Wilson, G Glenn; Ryder, Darren; Tekie, Habte; Petros, Beyene

    2017-06-01

    The construction of dams in sub-Saharan Africa is pivotal for food security and alleviating poverty in the region. However, the unintended adverse public health implications of extending the spatial distribution of water infrastructure are poorly documented and may minimize the intended benefits of securing water supplies. This paper reviews existing studies on the influence of dams on the spatial distribution of malaria parasites and vectors in sub-Saharan Africa. Common themes emerging from the literature were that dams intensified malaria transmission in semi-arid and highland areas with unstable malaria transmission but had little or no impact in areas with perennial transmission. Differences in the impacts of dams resulted from the types and characteristics of malaria vectors and their breeding habitats in different settings of sub-Saharan Africa. A higher abundance of a less anthropophilic Anopheles arabiensis than a highly efficient vector A. gambiae explains why dams did not increase malaria in stable areas. In unstable areas where transmission is limited by availability of water bodies for vector breeding, dams generally increase malaria by providing breeding habitats for prominent malaria vector species. Integrated vector control measures that include reservoir management, coupled with conventional malaria control strategies, could optimize a reduction of the risk of malaria transmission around dams in the region.

  9. Virtual OPACs versus Union Database: Two Models of Union Catalogue Provision.

    Science.gov (United States)

    Cousins, Shirley

    1999-01-01

    Considers some of the major technical and organizational issues involved in virtual-catalog production, contrasting them with the traditional union catalog approach exemplified by COPAC, an online public-access catalog composed of academic libraries in the United Kingdom. Suggest a method of integrating these two models of the union catalog.…

  10. Surveillance of medium-size dams; Surveillance des barrages de taille moyenne

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    French hydro-power buildings belong to the government and are retroceded by the licence holder when the granting delay comes to an end. Experience has shown that less care is given by licence holders to the maintenance of medium-size dams that to big dams. For this reason, the French Ministry of Industry decided to harmonize and standardize the surveillance practices of medium-size dams. A circular was signed on May 23, 1997 which concerns the 10 to 20 m height dams with water reservoir volumes lower than the H{sup 2} x V{sup 0.5} criterion which is an evaluation of the potential risk of the dam. The surveillance modalities concern: the construction, the licence holder file, the first filling up, the operation, and the periodical safety inspections. (J.S.)

  11. Climate change and the causes of dam failures in Australia

    International Nuclear Information System (INIS)

    Lewis, B.

    2007-01-01

    As a result of poor dam construction methods in Australia and significant droughts occurring over the past 60 years, there is a danger that mistakes made during previous droughts will be repeated. Dams were often built in soils of very low moisture content to ensure a properly compacted bank. As a result of these poor construction methods, the drought years have produced an unusually high number of dam failures. This paper discussed the causes of dam failures such as dispersive clays and defects in associated structures. The discussion on dispersive clays included cracking, piping, tunneling, and slides. Dispersive clays occur in soils whose clay minerals separate into single grains when placed in contact with water and are associated with high soil erodability and their distribution often coincides with the occurrence of erosion gullying, rilling and piping. Dispersive clays in a dam embankment can result in the leaching out of material from the embankment with consequent erosion and failure. Defects in associated structures that were discussed included spillway blockage and outlet pipe blockage. It was concluded that dam failures are seldom due to one particular cause but rather due to one weakness triggering another. It was concluded that failures are difficult and expensive to remedy. 9 refs., 4 figs

  12. Rock Mass Behavior Under Hydropower Embankment Dams: A Two-Dimensional Numerical Study

    Science.gov (United States)

    Bondarchuk, A.; Ask, M. V. S.; Dahlström, L.-O.; Nordlund, E.

    2012-09-01

    Sweden has more than 190 large hydropower dams, of which about 50 are pure embankment dams and over 100 are concrete/embankment dams. This paper presents results from conceptual analyses of the response of typical Swedish rock mass to the construction of a hydropower embankment dam and its first stages of operation. The aim is to identify locations and magnitudes of displacements that are occurring in the rock foundation and grout curtain after construction of the dam, the first filling of its water reservoir, and after one seasonal variation of the water table. Coupled hydro-mechanical analysis was conducted using the two-dimensional distinct element program UDEC. Series of the simulations have been performed and the results show that the first filling of the reservoir and variation of water table induce largest magnitudes of displacement, with the greatest values obtained from the two models with high differential horizontal stresses and smallest spacing of sub-vertical fractures. These results may help identifying the condition of the dam foundation and contribute to the development of proper maintenance measures, which guarantee the safety and functionality of the dam. Additionally, newly developed dams may use these results for the estimation of the possible response of the rock foundation to the construction.

  13. National Dam Inspection Program. Bentleyville Dam (NDI ID Number PA- 1096, DER ID Number 63-49), Ohio River Basin, Tributary North Branch Pigeon Creek, Washington County, Pennsylvania. Phase I Inspection Report

    Science.gov (United States)

    1981-06-01

    controlled manner.V The Bentleyville Dam is a significant hazard-small size dam. TK2 recommended spillway design flood (SDF) for a dam of this size and...the dam was completed in 1938. 9. Evaluation. No major deficiencies were observed during the inspection which were considered as having an immediate

  14. Will river erosion below the Three Gorges Dam stop in the middle Yangtze?

    Science.gov (United States)

    Lai, X.; Yin, D.; Finlayson, B. L.; Wei, T.; Li, M.; Yuan, W.; Yang, S.; Dai, Z.; Gao, S.; Chen, Z.

    2017-11-01

    The environmental impact of the Three Gorges Dam has been a subject of vigorous academic, political and social debate since its inception. This includes the key issue of post-dam river channel erosion, which was predicted by the feasibility study to extend to the river mouth. In this paper we examine the geomorphic response of the channel of the middle Yangtze for 660 km downstream of the dam. Using data on channel characteristics, bed material and sediment transport, we show that in the decade following the dam closure, pre-dam seasonal erosion has been replaced by year-round erosion, a pattern most marked at the upstream end of the study area. The sediment carrying capacity of the river channel has been largely reduced below the dam. The locus of bed scour has moved progressively downstream, ceasing as the bed material became too coarse to be transported (e.g. D50: 0.29 mm pre-dam coarsened to 20 mm below the dam by 2008). About 400 km below the dam there is a reduction in channel slope that changes the sediment carrying capacity from 0.25 kg m-3 to only about 0.05 kg m-3, which is insufficient to move bed sediment. The new long-term hydro-morphological equilibrium that will be established in this section of the middle Yangtze will prevent the further incision downstream initiated by the Three Gorges Dam. The results suggest that the full extent of adverse environmental impact predicted by the pre-dam studies will not eventuate.

  15. Comparison of HEC-RAS with FLDWAV and DAMBRK models for dam break analysis

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, R.D.; Judge, D.G.; Donnelly, C.R. [Acres International Ltd., Niagara Falls, ON (Canada)

    2004-09-01

    Dam break analysis is conducted as a routine dam safety assessment in determining the incremental hazard potential (IHP) that would occur in the event of a dam failure. Dam safety analysis also provides the information needed to make flood inundation maps and emergency preparedness plans (EPP) for dams that present a risk to human safety. For several years, the standard programs that have been used by the national weather service (NWS) for dam break flood simulation were the FLDWAV and DAMBRK models. However, another popular hydraulic model has been introduced. The HEC-RAS is an upgraded version of the former HEC-2 model used for the assessment of river floodplain inundation. A dam break analysis module has been added to HEC-2 and renamed the HEC-RAS which offers similar modeling capabilities to the DAMBRK and FLDWAV models for simulating flood hydrographs and flood wave propagation in river channels located downstream of a breached dam. The use of the alternative HEC-RAS could save time and resources. As such, it has the potential to replace the FLDWAV and DAMBRK. This paper compares the HEC-RAS dam break module with the FLDWAV and DAMBRK to determine if the new module accurately represents the dam break flood process. The comparison focuses on the theoretical background of the models, numerical solution techniques, ease of use of the module, modeling accuracy, practical aspects in performing dam break simulations, and capability for coupling the models with GIS for inundation mapping. The advantages and disadvantages of each model were summarized. 19 refs., 5 figs.

  16. Temporary Restoration of Bull Trout Passage at Albeni Falls Dam

    Energy Technology Data Exchange (ETDEWEB)

    Paluch, Mark; Scholz, Allan; McLellan, Holly [Eastern Washington University Department of Biology; Olson, Jason [Kalispel Tribe of Indians Natural Resources Department

    2009-07-13

    This study was designed to monitor movements of bull trout that were provided passage above Albeni Falls Dam, Pend Oreille River. Electrofishing and angling were used to collect bull trout below the dam. Tissue samples were collected from each bull trout and sent to the U. S. Fish and Wildlife Service Abernathy Fish Technology Center Conservation Genetics Lab, Washington. The DNA extracted from tissue samples were compared to a catalog of bull trout population DNA from the Priest River drainage, Lake Pend Oreille tributaries, and the Clark Fork drainage to determine the most probable tributary of origin. A combined acoustic radio or radio tag was implanted in each fish prior to being transported and released above the dam. Bull trout relocated above the dam were able to volitionally migrate into their natal tributary, drop back downstream, or migrate upstream to the next dam. A combination of stationary radio receiving stations and tracking via aircraft, boat, and vehicle were used to monitor the movement of tagged fish to determine if the spawning tributary it selected matched the tributary assigned from the genetic analysis. Seven bull trout were captured during electrofishing surveys in 2008. Of these seven, four were tagged and relocated above the dam. Two were tagged and left below the dam as part of a study monitoring movements below the dam. One was immature and too small at the time of capture to implant a tracking tag. All four fish released above the dam passed by stationary receivers stations leading into Lake Pend Oreille and no fish dropped back below the dam. One of the radio tags was recovered in the tributary corresponding with the results of the genetic test. Another fish was located in the vicinity of its assigned tributary, which was impassable due to low water discharge at its mouth. Two fish have not been located since entering the lake. Of these fish, one was immature and not expected to enter its natal tributary in the fall of 2008. The other

  17. Information collection and processing of dam distortion in digital reservoir system

    Science.gov (United States)

    Liang, Yong; Zhang, Chengming; Li, Yanling; Wu, Qiulan; Ge, Pingju

    2007-06-01

    The "digital reservoir" is usually understood as describing the whole reservoir with digital information technology to make it serve the human existence and development furthest. Strictly speaking, the "digital reservoir" is referred to describing vast information of the reservoir in different dimension and space-time by RS, GPS, GIS, telemetry, remote-control and virtual reality technology based on computer, multi-media, large-scale memory and wide-band networks technology for the human existence, development and daily work, life and entertainment. The core of "digital reservoir" is to realize the intelligence and visibility of vast information of the reservoir through computers and networks. The dam is main building of reservoir, whose safety concerns reservoir and people's safety. Safety monitoring is important way guaranteeing the dam's safety, which controls the dam's running through collecting the dam's information concerned and developing trend. Safety monitoring of the dam is the process from collection and processing of initial safety information to forming safety concept in the brain. The paper mainly researches information collection and processing of the dam by digital means.

  18. Social Customs and Trade Union Membership

    DEFF Research Database (Denmark)

    Ibsen, Christian Lyhne; Toubøl, Jonas; Jensen, Daniel Sparwath

    2017-01-01

    In this article, we investigate the effect of social customs on one of the most important instances of collective action, namely, workers uniting in trade unions. Although many studies have used social custom theory to explain unionization, existing studies have not adequately analysed social...... customs at the workplace. Using workplace union density as a proxy for social custom, this analysis improves existing studies in a number of ways. First, multi-level analyses of a large panel data set from Denmark reveal that there is a significant positive effect of workplace union density...... in unionization are required to create self-sustaining social customs for union membership. Thirdly, we test the acceleration using segmented regression analysis and find a significant acceleration around 45–65 per cent workplace union density. In the conclusion, we discuss the implications of our study...

  19. MacDonald Dam reconstruction : using roller-compacted concrete

    Energy Technology Data Exchange (ETDEWEB)

    O' Neil, E. [AMEC Earth and Environmental Ltd., Sydney, NS (Canada)

    2007-04-01

    Located in Nova Scotia, the MacDonald Dam was commissioned in 1928. The dam consists of a 122 metre-long, 16 metre-high concrete structure comprised of an intake structure, stoplog openings, and a 34 metre-long free-overflow spillway. A 488 metre-long power canal was added as an upgrade in the 1950s. This paper provided details of the roller-compact concrete (RCC) used in the dam's recent rehabilitation following a dam failure analysis in 2003 by Nova Scotia Power Inc. RCC was chosen to help keep the dam's construction project on schedule. The layout and cross-section of the spillway was selected with consideration given to the RCC placing operation. A lift thickness of 0.20 m was selected. A formed ogee crest consisting of conventional reinforced concrete was constructed on top of the RCC. The downstream steps of the spillway were also covered with cast-in-place concrete. A low level sluice was designed to resist the weight of the wet RCC. The design compressive strength of the RCC was 20 MPa. The forms used to support the cast-in-place facing concrete on the upstream face of the dam were constructed full height and were braced back to the downstream face of the existing concrete structure prior to the start of RCC placement. Formwork inserts were placed in the facing concrete as construction progressed. Crack inducers were pre-placed on the forms. Aggregates from a local source were transported to a pug mill as the RCC construction progressed. The RCC was spread into 0.20 m lifts using a small bull-dozer, and the facing concrete was vibrated into the lift below. RCC lifts were compacted using a 9 tonne vibratory drum roller. The RCC placing operation was completed over a period of 10 days. Following the completion of the RCC portion of the dam, the remainder of the cast-in-place concrete was completed. It was concluded that the RCC provided a durable, low-maintenance structure that was completed at a lower price and in a shorter time-frame than

  20. Dam break flood wave under different reservoir's capacities and ...

    Indian Academy of Sciences (India)

    Farhad Hooshyaripor

    2017-07-14

    Jul 14, 2017 ... Dam failure has been the subject of many hydraulic engineering studies due to its ... the role of the side slopes on dam break flood wave, such that lower side slope ... improve the inputs and advance our knowledge about the.

  1. Evaluation the concentration of mercury, zinc, arsenic, lead and cobalt in the Ilam city water supply network and resources

    Directory of Open Access Journals (Sweden)

    Ahmad Reza Yazdanbakhsh

    2017-04-01

    Full Text Available Background: The presence of heavy metals in water resources above threshold levels can be toxic and carcinogenic for consumers. This study determined the concentrations of heavy metals in the drinking water distribution network and resources of the city of Ilam in Iran. Methods: In this cross-sectional study from 6 sources of water supply and also, different parts of the water supply system of Ilam city, samples were collected based on standard sampling methods. The samples were tested with a BRAIC atomic absorption spectrophotometer. The data was analyzed using nonparametric Mann-Whitney test. Results: The concentration of zinc in all water sources of the city of Ilam was higher than WHO guidelines and Iranian standard 1053. Contamination by cobalt, arsenic and lead from Ilam dam, Pich-e Ashoori well and Haft Cheshmeh well was higher than national and international standards. The amount of cobalt and mercury at Ilam dam was significantly different from the levels at other sources (P < 0.05. Conclusion: The use of pesticides in the agricultural sector, contamination of water by human waste and aged and worn water pipes are the likely sources of the increased concentrations of heavy metals, especially lead and arsenic. Because there is a cumulative effect from these metals, appropriate measures are necessary by the relevant agencies to address this problem.

  2. Trans-European transport networks and urban systems in European Union

    Directory of Open Access Journals (Sweden)

    Maksin-Mićić Marija

    2003-01-01

    Full Text Available The trans-European transport network has different effects at interregional macro-regional and mezzo-regional level, and its effectiveness rises at the lower regional levels. Possible approaches to the trans-European transport network impact and effect survey and policy options have been pointed out. In that respect the brief review of survies, strategic framework and policies in European Union has been given. The importance of increased accessibility and mobility for regional expansion and for more balanced and polycentric system of city networks has been underlined. The question is how the new major transport infrastructure affects the development of functional complementarity between cities and regions. The new trans-European or major transport infrastructure does not per se create regional and urban system network development, although it can affect the conditions for the processes that create growth and development. The effects can be increased by co-ordination of measures of regional and urban policy, land use, transport and other policies. The necessary measure is the introduction of spatial impact assessment as sectorial policy instrument for the large transport infrastructure projects.

  3. Heavy metal contamination of water and fish in peri-urban dams ...

    African Journals Online (AJOL)

    Heavy metals were measured in water, sediment and fish in dams located downstream of effluent discharge zones in Bulawayo and were compared to those in a pristine upstream dam. Water conductivity indicated pollution of downstream dams. Levels of lead (0.13 – 0.28 ppm) and cadmium (0.02 – 0.06 ppm) in water from ...

  4. Estimated strength of shear keys in concrete dams

    Energy Technology Data Exchange (ETDEWEB)

    Curtis, D.D. [Hatch Energy, Niagara Falls, ON (Canada); Lum, K.K.Y. [BC Hydro, Burnaby, BC (Canada)

    2008-07-01

    BC Hydro requested that Hatch Energy review the seismic stability of Ruskin Dam which was constructed in 1930 at Hayward Lake in British Columbia. The concrete gravity dam is founded nearly entirely on rock in a narrow valley. The vertical joints between blocks are keyed and grouted. The strength of the shear keys was assessed when a non-linear finite element model found that significant forces were being transferred laterally to the abutments during an earthquake. The lateral transfer of loads to the abutment relies on the strength of the shear keys. The dynamic finite element analysis was used to determine the stability of the dam. A review of the shear strength measurements reported in literature showed that the measurements compared well to those obtained by BC Hydro from cores taken from Ruskin Dam. The cohesive strength obtained using the Griffith failure criteria was also in good agreement with both sets of measurements. A simple ultimate shear strength equation was developed using the Mohr-Coulomb failure criteria to determine combined cohesive and frictional strength of shear keys. Safety factors of 2.0 for static loads and 1.5 for seismic loads were proposed to reduce the ultimate strength to allowable values. It was concluded that given the relatively high shear strength established for the shear keys, the abutment rock or dam/abutment contact will control the amount of load which can arch to the abutments. 8 refs., 4 tabs., 5 figs.

  5. International Astronomical Union Sympoisum No.50

    CERN Document Server

    Westerlund, B

    1973-01-01

    Dr J. Landi Dessy, Director of the Astronomical Observatory, Cordoba, Argentina, invited the International Astronomical Union to hold a Symposium in Cordoba in connection with the celebration of the Centennial of the Cordoba Observatory; the date of foundation is October 24, 1871. He proposed that the Symposium should deal with Spectral Classification and Multicolour Photometry as seven years had elapsed since the Symposium No. 24 in Saltsj6baden, and much development had occurred in the field. The invitation and the proposal were accepted by the IAU, and the Symposium was held in Villa Carlos Paz, near Cordoba, between October 18 and October 24, 1971. It was attended by about 50 scientists representing Argentina, Canada, Chile, Den­ mark, France, Germany, Italy, Mexico, Sweden, Switzerland, U.K., U.S.A., Vatican City State and Venezuela. The Symposium was divided into four sessions: 1. Classification of slit spectra, 2. Classification of objective-prism spectra, 3. Photometric classification, 4. Catalogues ...

  6. Wynoochee Dam Foundation Report

    Science.gov (United States)

    1988-01-01

    schists and in propylitized andesite volcanic rocks. Tests on chlorite-bearing graywackes (Lumni Island and Robe Quarry, Seattle District) and... propylitized chlorite-bearing andesites (Blue River and Lookout Point Dams, Portland District) have shown these rocks to be durable materials with only minor

  7. Socio-economic impact of Trans-Siberian railway after the collapse of Soviet Union by integrated spatial data analysis

    Science.gov (United States)

    Uchida, Seina; Takeuchi, Wataru; Hatoyama, Kiichiro; Mazurov, Yuri

    2016-06-01

    How Russian cities have stood up again after the collapse of Soviet Union will be discussed in this paper. In order to know how the cities has managed the difficult period after the change of social system, transition of urban area, population, and nighttime light is searched. Although Far East will not stop as one of the most important area with abundant resources, overpopulation in towns and depopulation in countryside is going on. By searching the present situation, this research also aims to predict the future of Far East and Russia. First of all, Landsat data from 1987 to 2015 is collected over Moscow, Vladivostok, Novosibirsk, Tynda, and Blagoveshchensk and urban area is calculated by land cover classification. Secondly, population and retail turnover data are collected from year books in Russia. Thirdly, gross regional product (GRP) is estimated by nighttime light images from DMSP-OLS and VIIRS DNB dataset. In addition, these data are compared and difference of development stage after the collapse of Soviet Union between the unstable era (1990s-2000) and development era (2000-) will be discussed. It is expected that these analysis will give us useful information about Russian strategy for the future.

  8. River-damming, late-Quaternary rockslides in the Ötz Valley region (Tyrol, Austria)

    Science.gov (United States)

    Dufresne, A.; Ostermann, M.; Preusser, F.

    2018-06-01

    The Ötz Valley and adjacent regions in Tyrol (Austria) have been repeatedly affected by large rockslope failures following deglaciation. Six rockslides, each over 107 m3 in volume, were emplaced into the Ötz and Inn valleys, five of which formed persistent rockslide dams. Even though catastrophic rockslope failures are short-lived events (commonly minutes) they can have long-lasting impacts on the landscape. For example, large fans have built in the Ötz Valley and knickpoints persist at the former dam sites even though the Ötz River has eroded through the deposits during the past thousands of years; exact age-constraints of rockslide dam failure, however, are still scarce. Empirical, geomorphic stability indices from the literature successfully identified the least and the most stable dams of this group, whereas the rest remain inconclusive with some indices variably placing the dams in the stable, unstable, and uncertain categories. This shows (a) that further index calibrations and (b) better age constraints on dam formation and failure are needed, and (c) that the exact processes of dam failure are not always trivial to pinpoint for ancient (partially) breached dams. This study is a contribution towards better constraining the nature and landscape impact of dam formation following large rockslope failures.

  9. Beaver dams and channel sediment dynamics on Odell Creek, Centennial Valley, Montana, USA

    Science.gov (United States)

    Levine, Rebekah; Meyer, Grant A.

    2014-01-01

    Beaver dams in streams are generally considered to increase bed elevation through in-channel sediment storage, thus, reintroductions of beaver are increasingly employed as a restoration tool to repair incised stream channels. Here we consider hydrologic and geomorphic characteristics of the study stream in relation to in-channel sediment storage promoted by beaver dams. We also document the persistence of sediment in the channel following breaching of dams. Nine reaches, containing 46 cross-sections, were investigated on Odell Creek at Red Rock Lakes National Wildlife Refuge, Centennial Valley, Montana. Odell Creek has a snowmelt-dominated hydrograph and peak flows between 2 and 10 m3 s- 1. Odell Creek flows down a fluvial fan with a decreasing gradient (0.018-0.004), but is confined between terraces along most of its length, and displays a mostly single-thread, variably sinuous channel. The study reaches represent the overall downstream decrease in gradient and sediment size, and include three stages of beaver damming: (1) active; (2) built and breached in the last decade; and (3) undammed. In-channel sediment characteristics and storage were investigated using pebble counts, fine-sediment depth measurements, sediment mapping and surveys of dam breaches. Upstream of dams, deposition of fine (≤ 2 mm) sediment is promoted by reduced water surface slope, shear stress and velocity, with volumes ranging from 48 to 182 m3. High flows, however, can readily transport suspended sediment over active dams. Variations in bed-sediment texture and channel morphology associated with active dams create substantial discontinuities in downstream trends and add to overall channel heterogeneity. Observations of abandoned dam sites and dam breaches revealed that most sediment stored above beaver dams is quickly evacuated following a breach. Nonetheless, dam remnants trap some sediment, promote meandering and facilitate floodplain development. Persistence of beaver dam sediment

  10. The Social, Historical, and Institutional Contingencies of Dam Removal

    Science.gov (United States)

    Magilligan, F. J.; Sneddon, C. S.; Fox, C. A.

    2017-06-01

    Environmental managers in the United States and elsewhere are increasingly perceiving dam removal as a critical tool for river restoration and enhancing watershed resilience. In New England, over 125 dams have been dismantled for ecological and economic rationales. A surprising number of these removals, including many that are ongoing, have generated heated conflicts between restoration proponents and local communities who value their dammed landscapes. Using a comparative case study approach, we examine the environmental conflict around efforts to remove six dams in New England. Each of these removal efforts followed quite different paths and resultant outcomes: successful removal, stalled removal, and failure despite seemingly favorable institutional conditions. Lengthy conflicts often transpired in instances where removals occurred, but these were successfully arbitrated by paying attention to local historical-geographical conditions conducive to removal and by brokering effective compromises between dam owners and the various local actors and stakeholders involved in the removal process. Yet our results across all cases suggest that these are necessary, but not sufficient conditions for restoration through dam removal since a similar set of conditions typified cases where removals are continuously stalled or completely halted. Scholars examining the intersection between ecological restoration and environmental politics should remain vigilant in seeking patterns and generalities across cases of environmental conflict in order to promote important biophysical goals, but must also remain open to the ways in which those goals are thwarted and shaped by conflicts that are deeply contingent on historical-geographical conditions and broader institutional networks of power and influence.

  11. The Social, Historical, and Institutional Contingencies of Dam Removal.

    Science.gov (United States)

    Magilligan, F J; Sneddon, C S; Fox, C A

    2017-06-01

    Environmental managers in the United States and elsewhere are increasingly perceiving dam removal as a critical tool for river restoration and enhancing watershed resilience. In New England, over 125 dams have been dismantled for ecological and economic rationales. A surprising number of these removals, including many that are ongoing, have generated heated conflicts between restoration proponents and local communities who value their dammed landscapes. Using a comparative case study approach, we examine the environmental conflict around efforts to remove six dams in New England. Each of these removal efforts followed quite different paths and resultant outcomes: successful removal, stalled removal, and failure despite seemingly favorable institutional conditions. Lengthy conflicts often transpired in instances where removals occurred, but these were successfully arbitrated by paying attention to local historical-geographical conditions conducive to removal and by brokering effective compromises between dam owners and the various local actors and stakeholders involved in the removal process. Yet our results across all cases suggest that these are necessary, but not sufficient conditions for restoration through dam removal since a similar set of conditions typified cases where removals are continuously stalled or completely halted. Scholars examining the intersection between ecological restoration and environmental politics should remain vigilant in seeking patterns and generalities across cases of environmental conflict in order to promote important biophysical goals, but must also remain open to the ways in which those goals are thwarted and shaped by conflicts that are deeply contingent on historical-geographical conditions and broader institutional networks of power and influence.

  12. Earthquake Hazard for Aswan High Dam Area

    Science.gov (United States)

    Ismail, Awad

    2016-04-01

    Earthquake activity and seismic hazard analysis are important components of the seismic aspects for very essential structures such as major dams. The Aswan High Dam (AHD) created the second man-made reservoir in the world (Lake Nasser) and is constructed near urban areas pose a high-risk potential for downstream life and property. The Dam area is one of the seismically active regions in Egypt and is occupied with several cross faults, which are dominant in the east-west and north-south. Epicenters were found to cluster around active faults in the northern part of Lake and AHD location. The space-time distribution and the relation of the seismicity with the lake water level fluctuations were studied. The Aswan seismicity separates into shallow and deep seismic zones, between 0 and 14 and 14 and 30 km, respectively. These two seismic zones behave differently over time, as indicated by the seismicity rate, lateral extent, b-value, and spatial clustering. It is characterized by earthquake swarm sequences showing activation of the clustering-events over time and space. The effect of the North African drought (1982 to present) is clearly seen in the reservoir water level. As it decreased and left the most active fault segments uncovered, the shallow activity was found to be more sensitive to rapid discharging than to the filling. This study indicates that geology, topography, lineations in seismicity, offsets in the faults, changes in fault trends and focal mechanisms are closely related. No relation was found between earthquake activity and both-ground water table fluctuations and water temperatures measured in wells located around the Kalabsha area. The peak ground acceleration is estimated in the dam site based on strong ground motion simulation. This seismic hazard analyses have indicated that AHD is stable with the present seismicity. The earthquake epicenters have recently took place approximately 5 km west of the AHD structure. This suggests that AHD dam must be

  13. Lead isotopes as seepage indicators around a uranium tailings dam

    International Nuclear Information System (INIS)

    Gulson, B.L.; Mizon, K.J.; Korsch, M.J.; Noller, B.N.

    1989-01-01

    Lead isotope ratios and lead concentrations have been measured in water from 26 bores around the Ranger uranium tailings dam, Northern Territory, Australia, and from the dam itself to determine possible migration of lead derived from the radioactive decay of uranium. Lead isotope compositions have also been measured for the particulates retained on selected filters. The concentration of lead in the bore waters is extremely low (usually 206 Pb/ 204 Pb ratio measured in the bore waters differs by more than a factor of 100 from that in the tailings dam and shows no evidence of lead derived from a significant uranium accumulation. It may be possible to distinguish between lead from the tailings dam and that derived from a nearby uranium ore body

  14. After Three Gorges Dam: What have we learned?

    Science.gov (United States)

    Natali, J.; Williams, P.; Wong, R.; Kondolf, G. M.

    2013-12-01

    China is at a critical point in its development path. By investing heavily in large-scale infrastructure, the rewards of economic growth weigh against long-term environmental and social costs. The construction of Three Gorges Dam, the world's largest hydroelectric project, began in 1994. Between 2002 and 2010, its 660 kilometer reservoir filled behind a 181 meter dam, displacing at least 1.4 million people and transforming Asia's longest river (the Yangtze) while generating nearly 100 billion kWh/yr of electricity -- 2.85% of China's current electric power usage. As the mega-project progenitor in a cascade of planned dams, the Three Gorges Dam emerges as a test case for how China will plan, execute and mitigate its development pathway and the transformation of its environment. Post-Project Assessments (PPA) provide a systematic, scientific method for improving the practice of environmental management - particularly as they apply to human intervention in river systems. In 2012, the Department of Landscape Architecture and Environmental Planning at University of California, Berkeley organized a symposium-based PPA for the Three Gorges Dam on the Yangtze River. Prior to this symposium, the twelve invited Chinese scientists, engineers and economists with recent research on Three Gorges Dam had not had the opportunity to present their evaluations together in an open, public forum. With a 50-year planning horizon, the symposium's five sessions centered on impacts on flows, geomorphology, geologic hazards, the environment and socioeconomic effects. Three Gorges' project goals focused on flood control, hydropower and improved navigation. According to expert research, major changes in sediment budget and flow regime from reservoir operation have significantly reduced sediment discharge into the downstream river and estuary, initiating a series of geomorphic changes with ecological and social impacts. While the dam reduces high flow stages from floods originating above the

  15. Cracking Behavior of a Concrete Arch Dam with Weak Upper Abutment

    Directory of Open Access Journals (Sweden)

    Lei Xu

    2017-01-01

    Full Text Available The cracking behavior and failure mode of a 78 m high concrete double-curvature arch dam with weak upper abutment are investigated through performing cracking analysis. The mechanical behavior of concrete is simulated using a smeared crack model, in which a combination of the compression yield surface and the crack detection surface with a damaged elasticity concept is employed to describe the failure of concrete. The arch dam with practical mechanical properties of the upper and lower abutments is firstly studied with emphasis on its cracking behavior during overloading. Then, a comprehensive sensitivity analysis is carried out to investigate the influence of the ratio of the mechanical properties of upper abutment to those of lower abutment on dam failure with prime attention placed on the failure mode. Simulation results indicate the adopted smeared crack model is well-suited to the crack analysis of concrete arch dam. It is shown that cracking is localized around the interface between upper and lower abutments, which leads to a fast crack growth in the through-thickness direction of dam and finally causes the dam failure. Furthermore, the sensitivity analysis presents three types of failure modes corresponding to different ratio value, wherein Modes II and III should be avoided since the weak upper abutment plays a predominant role in the cracking and failure of concrete arch dam.

  16. Potential Impact of Planned Andean Dams on the Amazon Fluvial Ecosystem

    Science.gov (United States)

    Forsberg, B.; Melack, J. M.; Dunne, T.; Barthem, R. B.; Paiva, R. C. D.; Sorribas, M.; Silva, U. L., Jr.

    2016-12-01

    Increased energy demand has led to plans for building 151 new dams in the western Amazon, mostly in the Andes Region. Historical data and simulation scenarios were used to explore potential impacts above and below six of the largest storage dams planned for the region. These impacts included: 1) reduction in the downstream sediment supply 2) reduction in the downstream nutrient supply, 3) attenuation of the downstream flood pulse and 4) increased greenhouse gas emissions. Together, the six dams are expected to reduce the total downstream supply of sediments, total phosphorus (TP) and total nitrogen (TN) from the Andes by 66, 65 and 49%, respectively. These large reductions in sediment and nutrient supplies will have major impacts on channel geomorphology, floodplain fertility and aquatic productivity. These impacts are expected to be greatest close to the dams but could also extend to the central Amazon floodplain and delta regions. The attenuation of the downstream flood pulse following impoundment is expected to alter the survival, phenology and growth patterns of floodplain vegetation and result in lower fish yields in the downstream regions closest to the dams. Greenhouse gas emissions above and below the dams are expected to increase, contributing to significantly higher regional and global emissions for dams. Gas fired power plants are suggested as a cleaner, less impactful alternative to meeting regional energy demands.

  17. The big issue: environment and large dams

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, Peter [Harvard Univ. (United States)

    1999-09-01

    Some of the environmental issues associated with large dams are discussed. Prior to commencement of construction of the Three Gorges dam in China in 1993, 50 years of planning and 20 years of environmental argument had taken place. The Chinese were conscious of the need to consider the environmental issues as a factor in attracting foreign investment for the world's biggest and most expensive dam. While the resettlement issues (1.2 M people were resettled) have dominated the current arguments, the other important issues are environment, economics and safety. Despite criticism from environmentalists, both at home and abroad, the Chinese went ahead with the project. With regard to resettlement, the Chinese appear to be much more considerate than some other countries in providing housing and agricultural land. Perhaps the main losses were suffered by cultural heritage sites and aquatic systems, rather than by the resettled population. (UK)

  18. The big issue: environment and large dams

    International Nuclear Information System (INIS)

    Rogers, Peter

    1999-01-01

    Some of the environmental issues associated with large dams are discussed. Prior to commencement of construction of the Three Gorges dam in China in 1993, 50 years of planning and 20 years of environmental argument had taken place. The Chinese were conscious of the need to consider the environmental issues as a factor in attracting foreign investment for the world's biggest and most expensive dam. While the resettlement issues (1.2 M people were resettled) have dominated the current arguments, the other important issues are environment, economics and safety. Despite criticism from environmentalists, both at home and abroad, the Chinese went ahead with the project. With regard to resettlement, the Chinese appear to be much more considerate than some other countries in providing housing and agricultural land. Perhaps the main losses were suffered by cultural heritage sites and aquatic systems, rather than by the resettled population. (UK)

  19. Sinkhole formation mechanism at Steinaker Dam : the complete story

    Energy Technology Data Exchange (ETDEWEB)

    Dise, K. [United States Dept. of the Interior, Washington, DC (United States). Bureau of Reclamation

    2009-07-01

    This case history summary described an internal erosion event that occurred at a zoned earthfill dam located within the Ashley Creek watershed area of the Uinta Mountain uplift. The incident occurred under static loading. The rocks in the region are heavily fractured with close to moderately spaced joints along the bedding planes. The joints were not grouted during the dam's construction, and the foundation was not treated with dental concrete or slush grouting. The dam's core material consisted of a mixture of clay, silt and sand. A sinkhole area appeared on the downstream face of the dam and was filled. A second sinkhole appeared in 1965. Abutment grouting was performed. A core investigation study in 1992 showed that voids were present in the core. Deep dynamic compaction was used to densify the foundation materials. Voids in the gravel envelope were filled with fine sand. The investigation showed that the sinkholes were formed by seeps travelling through abutment bedrock fractures. The voids were large enough to provide an exit for the fine-grained foundation alluvial materials. It was concluded that grouting the abutment prevented higher velocity seepages that may have eventually initiated a dam breach. 6 figs.

  20. The Sulphate Effect on Lijiaxia Concrete Dam (China Gallery

    Directory of Open Access Journals (Sweden)

    Xufen Zhu

    2017-01-01

    Full Text Available The concrete degradation is one of the most serious problems for a dam construct during the normal operation, which determines the dam service life. Hence, it is very important to reduce the extent of the dam concrete degradation for the safety of the dam normal operation. Here, Lijiaxia hydroelectric station is taken as an example, and a comprehensive method to assess the sulphate effect on dam gallery is proposed. Eleven samples in total were taken from three difference locations by the drill bore. The microstructural investigations including X-ray fluorescence spectrometry (XRF, X-ray diffraction (XRD, scanning electron microscope (SEM, and energy dispersive spectroscopy (EDS were conducted to assess the sulphate attack and the degradation degree. Meanwhile, the water chemical analysis was applied to reveal the mechanism of concrete degradation. The experimental and analysis results indicate that the concrete degradation degree varies with the location of the samples. The components of the concrete change and the content of SO3 increase dramatically during degradation. Moreover, the mineral facies of the concrete change correspondingly, with the cement paste substituted by the calcite, calcium vitriol, and gypsum. The reinforcement and precaution measures are suggested based on the results of the degradation assessment.

  1. Haggart Island dams : reconstruction/rehabilitation feasibility study : final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-03-15

    This feasibility study was conducted to identify and evaluate the range of options available for the repair or reconstruction of the Haggart Island Dams, and to provide the required information needed to decide upon the preferred solution and secure funding for the final design for reconstruction. In addition, the study presented the initial stages needed to satisfy the environmental assessment process regarding the selection of options related to the structures. Information relating to: fish habitat; flood mapping; historical flow data; condition of the dams; historical significance of the dams and their relation to the area; recreational opportunities for the area and previous public consultation records was presented. Issues regarding water level were addressed through a hydraulic analysis. Field and background data were compiled in order to establish the existing conditions of the study area. Background information regarding the natural features of the study area was presented. Safety issues were assessed in developing landscaping features and pathway planning. Details of public consultation procedures were presented. Information from stakeholders was gathered regarding recreational activities, river flow, historical and nature related issues to develop an understanding of the significance of the dams. Various design alternatives were presented, as well as details of the current, deteriorating state of the dams. 5 tabs., 24 figs.

  2. NB Power's Mactaquac Dam : is it possible for the Mactaquac Dam to mitigate the flooding in the Maugerville/Sheffield area?

    International Nuclear Information System (INIS)

    Ismail, S.; Harriman, F.

    1997-04-01

    The feasibility of using the Mactaquac Dam to control river flows and mitigate flooding in the Maugerville/Sheffield area in New Brunswick was discussed. The area is located in the Saint John River valley and has often been subjected to flooding. The causes of the floods in the section of the river were examined in order to evaluate the effectiveness of using the Mactaquac Dam in this manner. The storage capability of the Mactaquac headpond was also examined. The 1973 flood was used as an example to demonstrate the capability of the dam to control flood levels. It was concluded that the flooding in the area is a natural phenomenon and that the Mactaquac Development was not designed and does not have the ability to mitigate flood levels. 1 fig

  3. Photoluminescence detection of alpha particle using DAM-ADC nuclear detector

    Energy Technology Data Exchange (ETDEWEB)

    Abdalla, Ayman M., E-mail: aymanabdalla62@hotmail.com [Department of Physics, College of Science and Arts, Najran University, P.O. Box 1988, Najran 11001 (Saudi Arabia); Promising Centre for Sensors and Electronic Devices (PCSED), Najran University, P.O. Box: 1988, Najran 11001 (Saudi Arabia); Harraz, Farid A., E-mail: fharraz68@yahoo.com [Promising Centre for Sensors and Electronic Devices (PCSED), Najran University, P.O. Box: 1988, Najran 11001 (Saudi Arabia); Nanostructured Materials and Nanotechnology Division, Central Metallurgical Research and Development Institute (CMRDI), P.O. Box: 87 Helwan, Cairo 11421 (Egypt); Ali, Atif M. [Department of Physics, Faculty of Science, King Khalid University, Abha (Saudi Arabia); Al-Sayari, S.A. [Promising Centre for Sensors and Electronic Devices (PCSED), Najran University, P.O. Box: 1988, Najran 11001 (Saudi Arabia); College of Science and Arts-Sharoura, Najran University (Saudi Arabia); Al-Hajry, A. [Department of Physics, College of Science and Arts, Najran University, P.O. Box 1988, Najran 11001 (Saudi Arabia); Promising Centre for Sensors and Electronic Devices (PCSED), Najran University, P.O. Box: 1988, Najran 11001 (Saudi Arabia)

    2016-09-11

    The photoluminescence (PL) and UV–vis spectral analysis of DAM-ADC (diallyl maleate: DAM, polyallyl diglycol carbonate: ADC) nuclear detector are demonstrated for the first time. The DAM-ADC surfaces were exposed to thin {sup 241}Am disk source that emits alpha particles with activity 333 kBq. It is found that the track density of the irradiated samples remarkably influences the PL characteristics of the DAM-ADC detector. The spectral peak heights and the integrated intensities under the peaks exhibit linear correlations with correlation coefficient R{sup 2}=0.9636 and 0.9806, respectively for different alpha particle fluences ranging from 8.16–40.82×10{sup 7} particles/cm{sup 2}. Additionally, a correlation coefficient R{sup 2}=0.9734 was achieved for the UV–vis spectral analysis. The linear fitting functions, along with the corresponding fitting parameters were evaluated in each case. Both the PL and the UV–vis data of the irradiated DAM-ADC samples showed considerable spectral differences, and hence they would be used to offer sensitive approaches for alpha particle detection.

  4. Aylmer Dam : past, present and future; Barrage Aylmer : passe, present et futur

    Energy Technology Data Exchange (ETDEWEB)

    Giguere, H; Lehoux, B; Toma, G [Quebec Ministere du Developpement durable, de l' Environnement et des Parcs, Quebec, PQ (Canada). Centre d' Expertise Hydrique

    2006-07-01

    The Aylmer gravity dam was built in 1953 in Weedon in Quebec's Eastern Townships. The water reservoir retained by the Aylmer Dam has a capacity of 201,928,700 cubic metres and many houses and cottages now line its shores. As such, the water level must be kept high during the summer holiday season. The initial purpose of the dam was for log transportation, the regulation of the Saint-Francois River and the production of electricity. The retention structure belongs to the Quebec government and is managed by the Centre d'Expertise Hydrique du Quebec (CEHQ). Underwater inspection of the dam in 1998 showed signs of erosion damage that required repair. Five of the dam's seven sluices were equipped with stop logs while the others had metallic floodgates. The damage was caused by the preferential use of the 2 floodgates over the years. This paper described the 3 phases for modernizing the evacuation devices of this dam. The first phase began in 2003 with the repair of the dam. The second phase involved the construction of a more modern building in 2004, and the third phase involved the replacement of wooden girders with heated metallic sluices in 2005. The modernization of this dam has reduced the time for required for water evacuation operations during all seasons and has eliminated the danger linked to de-icing techniques. 1 ref., 8 figs.

  5. Multiyear Downstream Response to Dam Removal on the White Salmon River, WA

    Science.gov (United States)

    Wilcox, A. C.; O'Connor, J. E.; Major, J. J.

    2017-12-01

    The 2011 removal of the 38 m tall Condit Dam on the White Salmon River, Washington was one of the largest dam removals to date, in terms of both dam height and sediment release. We examined the multiyear geomorphic response to this event, through 2015, including in a bedrock-confined canyon and in a less-confined, backwater-influenced pool reach near the river's mouth, to the large, rapid influx of fine reservoir sediment produced by the breach and to subsequent sediment transfer in the free-flowing White Salmon River. In the canyon reach, aggraded sediments were rapidly eroded from riffles, returning them toward pre-breach bed elevations within weeks, but pool aggradation persisted for longer. The downstream, less-confined reach transformed from a deep pool to a narrower pool-riffle channel with alternate bars; multiyear observations showed persistence of bars and of this new and distinct morphology. This downstream reach marks a rare case in post-dam removal channel response; in most dam removals, channels have rapidly reverted toward pre-removal morphology, as in the canyon reach here. Comparison of the multiyear geomorphic evolution of the White Salmon River to other recent large dam removals in the U.S. allows evaluation of the relative influences of antecedent channel morphology, post-breach hydrology, and dam removal style, as well as providing a basis for predicting responses to future dam removals.

  6. Replication of Vibrio cholerae chromosome I in Escherichia coli: dependence on dam methylation

    DEFF Research Database (Denmark)

    Koch, Birgit; Ma, Xiaofang; Løbner-Olesen, Anders

    2010-01-01

    . cholerae chromosome I replication, which similar to what is observed for E. coli. No hda homologue has been identified in V. cholerae yet. In V. cholerae, dam is essential for viability, whereas in E. coli, dam mutants are viable. Replacement of E. coli oriC with oriCIVc allowed us to specifically address...... the role of the Dam methyltransferase and SeqA in replication initiation from oriCIVc. We show that when E. coli's origin of replication is substituted by oriCIVc, dam, but not seqA, becomes important for growth, arguing that Dam methylation exerts a critical function at the origin of replication itself....... We propose that Dam methylation promotes DnaA-assisted successful duplex opening and replisome assembly at oriCIVc in E. coli. In this model, methylation at oriCIVc would ease DNA melting. This is supported by the fact that the requirement for dam can be alleviated by increasing negative supercoiling...

  7. Resilience scales of a dammed tropical river

    Science.gov (United States)

    Calamita, Elisa; Schmid, Martin; Wehrli, Bernhard

    2017-04-01

    Artificial river impoundments disrupt the seasonality and dynamics of thermal, chemical, morphological and ecological regimes in river systems. These alterations affect the aquatic ecosystems in space and time and specifically modify the seasonality and the longitudinal gradients of important biogeochemical processes. Resilience of river systems to anthropogenic stressors enables their recovery along the flow path; however little is known about the longitudinal distance that rivers need to partially restore their physical, chemical and biological integrity. In this study, the concept of a "resilience scale" will be explored for different water quality parameters downstream of Kariba dam, the largest artificial lake in the Zambezi basin (South-East Africa). The goal of this project is to develop a modelling framework to investigate and quantify the impact of large dams on downstream water quality in tropical context. In particular, we aim to assess the degree of reversibility of the main downstream alterations (temperature, oxygen, nutrients) and consequently the quantification of their longitudinal extent. Coupling in-situ measurements with hydraulic and hydrological parameters such as travel times, will allow us to define a physically-based parametrization of the different resilience scales for tropical rivers. The results will be used for improving future dam management at the local scale and assessing the ecological impact of planned dams at the catchment scale.

  8. study and analysis of asa river hypothetical dam break using hec-ras

    African Journals Online (AJOL)

    Impounded reservoirs provide beneficial functions such as flood control, recreation, hydropower and water supply but they also carry potential risks. Spontaneous dam break phenomenon can occur and the resultant flooding may cause substantial loss of life and property damage downstream of the dam. A hypothetical dam ...

  9. Using causal maps to support ex-post assessment of social impacts of dams

    International Nuclear Information System (INIS)

    Aledo, Antonio; García-Andreu, Hugo; Pinese, José

    2015-01-01

    - Highlights: • We defend the usefulness of causal maps (CM) for ex-post impact assessment of dams. • Political decisions are presented as unavoidable technical measures. • CM enable the identification of multiple causes involved in the dam impacts. • An alternative management of the dams is shown from the precise tracking of the causes. • Participatory CM better the quality of information and the governance of the research. This paper presents the results of an ex-post assessment of two important dams in Brazil. The study follows the principles of Social Impact Management, which offer a suitable framework for analyzing the complex social transformations triggered by hydroelectric dams. In the implementation of this approach, participative causal maps were used to identify the ex-post social impacts of the Porto Primavera and Rosana dams on the community of Porto Rico, located along the High Paraná River. We found that in the operation of dams there are intermediate causes of a political nature, stemming from decisions based on values and interests not determined by neutral, exclusively technical reasons; and this insight opens up an area of action for managing the negative impacts of dams

  10. Study on real working performance and overload safety factor of high arch dam

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    Considering the fact that high arch dams have problems such as complicated stress,high cost,and hazards after being damaged,this paper intends to study the effects of load,material strength,and safety analysis method on dam safety and working performance of arch dams.In this article,the effects of temperature,self weight exaction way and water loading on structure response are first discussed,and a more reasonable way of considering is then put forward.By taking into consideration the mechanical property of materials and comparing the effects of different yield criteria on overloading safety of high arch dams,this paper concludes that brittle characteristics of concrete should be fully considered when conducting safety assessment for high arch dams to avoid overestimating the bearing capacity of the dams.By comparing several typical projects,this paper works out a safety assessment system of multiple safety and relevant engineering analogical analysis methods,which is closer to the actual situation,and thus is able to assess the response of high arch dam structure in a more comprehensive way,elicit the safety coefficients in different situations,and provide a new way of considering the safety assessment of high arch dams.

  11. Using causal maps to support ex-post assessment of social impacts of dams

    Energy Technology Data Exchange (ETDEWEB)

    Aledo, Antonio, E-mail: Antonio.Aledo@ua.es [Departamento de Sociología 1, Universidad de Alicante, Alicante 03080 (Spain); García-Andreu, Hugo, E-mail: Hugo.Andreu@ua.es [Departamento de Sociología 1, Universidad de Alicante, Alicante 03080 (Spain); Pinese, José, E-mail: pinese@uel.br [Centro de Ciências Exatas, UEL, Rodovia Celso Cid, Km 380, Campus Universitário, Londrina, PR 86057-970 (Brazil)

    2015-11-15

    - Highlights: • We defend the usefulness of causal maps (CM) for ex-post impact assessment of dams. • Political decisions are presented as unavoidable technical measures. • CM enable the identification of multiple causes involved in the dam impacts. • An alternative management of the dams is shown from the precise tracking of the causes. • Participatory CM better the quality of information and the governance of the research. This paper presents the results of an ex-post assessment of two important dams in Brazil. The study follows the principles of Social Impact Management, which offer a suitable framework for analyzing the complex social transformations triggered by hydroelectric dams. In the implementation of this approach, participative causal maps were used to identify the ex-post social impacts of the Porto Primavera and Rosana dams on the community of Porto Rico, located along the High Paraná River. We found that in the operation of dams there are intermediate causes of a political nature, stemming from decisions based on values and interests not determined by neutral, exclusively technical reasons; and this insight opens up an area of action for managing the negative impacts of dams.

  12. Dam construction as an engineering solution for water supply problem : environmental thrusts

    Energy Technology Data Exchange (ETDEWEB)

    Hosseini, A.H. [Alberta Univ., Edmonton, AB (Canada). Dept. of Civil and Environmental Engineering

    2004-09-01

    Water supply management and the potential impacts associated with engineering practices in water supply systems were examined. Global aspects of increasing water demand were presented and compared with populations, urbanization and water demand. Engineering practices in waterworks developments such as dam construction, river intakes, infiltration galleries, wells, boreholes and adits were also discussed. Construction of large dams and the problems associated with damming the rivers were studied as large dams generally have substantial impacts on rivers, watersheds and aquatic ecosystems, leading to the irreversible loss of species populations and ecosystems. These problems include negative impacts on the terrestrial ecosystem, greenhouse gas emissions from reservoirs due to decaying vegetation and carbon inflows from the catchment, changes in flow regimes, trapping of sediments and nutrients behind a dam, blocking migration of aquatic organisms, as well as negative impacts on flood plain ecosystems and fisheries. In addition, a case study, on the environmental impacts associated with damming in Three Gorges Valley in China was presented. 9 refs., 8 figs.

  13. The social impacts of dams: A new framework for scholarly analysis

    International Nuclear Information System (INIS)

    Kirchherr, Julian; Charles, Katrina J.

    2016-01-01

    No commonly used framework exists in the scholarly study of the social impacts of dams. This hinders comparisons of analyses and thus the accumulation of knowledge. The aim of this paper is to unify scholarly understanding of dams' social impacts via the analysis and aggregation of the various frameworks currently used in the scholarly literature. For this purpose, we have systematically analyzed and aggregated 27 frameworks employed by academics analyzing dams' social impacts (found in a set of 217 articles). A key finding of the analysis is that currently used frameworks are often not specific to dams and thus omit key impacts associated with them. The result of our analysis and aggregation is a new framework for scholarly analysis (which we call ‘matrix framework’) specifically on dams' social impacts, with space, time and value as its key dimensions as well as infrastructure, community and livelihood as its key components. Building on the scholarly understanding of this topic enables us to conceptualize the inherently complex and multidimensional issues of dams' social impacts in a holistic manner. If commonly employed in academia (and possibly in practice), this framework would enable more transparent assessment and comparison of projects.

  14. Use of isotopes and geophysical techniques in studying dam leakage-case of the Afamia dams Syria

    International Nuclear Information System (INIS)

    Kattan, Z.; Naser, R.; Al-Fares, W.; Kadkoy, N.; Sbenati, M.R.; Al-Hilal, M.; Sleman, I.; Al-Ali, A.

    2011-08-01

    Different techniques such as: hydrochemistry, environmental isotopes, radon and geophysical surveys have been applied all together in investigating the water leakages from the Afamia (A, B and C) dams during the period 2006-2008. Groundwater movement in this area shows the existence of two major discharge cones or sinks in the vicinity of B and C reservoirs. This movement suggests a probable vertical leaking and interconnection between the shallow Neogene aquifer and the deeper Karstified water bearing system of the Upper Cretaceous. Spatial distribution patterns of major ions in the groundwater provided comprehensive arguments for the existence of an active dissolution zone of calcareous rocks at a depth of about 45 m below the land surface, facilitating hence the vertical penetration of stored surface water towards the Cretaceous aquifer. The remarkable contrasts in stable isotope compositions between the depleted and highly enriched waters nearby the B reservoir provide another support for water leaks by vertical penetration beneath or very close to the B dam body. The high radon values in the soils, linearly distributed along some tectonic lineaments, may indicate the usefulness of radon method for tracing and mapping unknown faults. Application of some selected geophysical methods (electromagnetic survey, vertical geoelectric sounding and tomography plates) revealed the presence of alternating lithological heterogeneity between permeable and impermeable layers, which may lead to subhorizontal infiltration through the geological formations of the basin. Vertical leakage which could take place in certain locations via existing faults and karst and fractures that hit the main valley may pass through the dam lake. This structure is most likely causing hydraulic connections between the superficial Neogene deposits and the underlying Cretaceous fractured and permeable carbonates rocks. The presence of clayey and silty zones, mostly of high electrical conductivity

  15. Numerical Modelling of Tailings Dam Thermal-Seepage Regime Considering Phase Transitions

    Directory of Open Access Journals (Sweden)

    Aniskin Nikolay Alekseevich

    2017-01-01

    Full Text Available Statement of the Problem. The article describes the problem of combined thermal-seepage regime for earth dams and those operated in the permafrost conditions. This problem can be solved using the finite elements method based on the local variational formulation. Results. A thermal-seepage regime numerical model has been developed for the “dam-foundation” system in terms of the tailings dam. The effect of heat-and-mass transfer and liquid phase transition in soil interstices on the dam state is estimated. The study with subsequent consideration of these factors has been undertaken. Conclusions. The results of studying the temperature-filtration conditions of the structure based on the factors of heat-and-mass transfer and liquid phase transition have shown that the calculation results comply with the field data. Ignoring these factors or one of them distorts the real situation of the dam thermal-seepage conditions.

  16. Separating the mink dam from the litter at 7 or 8 weeks after delivery

    DEFF Research Database (Denmark)

    Malmkvist, Jens; Palme, Rupert; Larsen, Torben

    2015-01-01

    The optimal timing of separating the mink dam from the litter is suggested to be a balance between the partly conflicting needs of the mother and the kits. Early removal of the dam or partial removal of the litter may protect the dam against exhaustion. Little is known about the maternal motivation...... around the time of separation. Therefore, we investigated the effects of separating the dam from the litter, using brown first-parity dams (N=374) randomly assigned within each date of delivery to two treatment groups: The dam was taken away from the litter either at day 49 ±1 (7w, N=185) or at day 56 ±1...... (8w, N=189) after birth. The aim was to investigate whether the dams had a different motivation to take care of the litter after 7 and 8 weeks, estimated by non-invasive determination of cortisol (FCM: Faecal Corticsol Metabolites) and dam calls the first week after separation. The two treatment...

  17. Flood and rockslide mitigative measures for the concrete sections of the Daisy Lake Dam

    International Nuclear Information System (INIS)

    Pataky, T.J.

    1991-01-01

    Studies conducted under British Columbia Hydro's dam safety program during the early 1980s indicated that dam sections of the Daisy Lake Dam would be overtopped by the probable maximum flood (PMF) and by a postulated slide generated wave (SGW). It was considered that the overtopping by either of the events could cause several sections of the concrete dam to fall, thereby resulting in uncontrolled release of the reservoir. The criteria used for determining foundation strength parameters, static and SGW induced water pressures, effective uplift and the appropriate factors of safety are discussed. The results of the analyses for the original dam sections and the design and implementation of the selected remedial measures are also described. These measures included lowering the Wing Dam and Saddle Dam by about 2 m to increase the spillway capacity and the installation of 43 post-tensioned anchors in the various sections of the main concrete and Wing dams. 9 refs., 8 figs., 3 tabs

  18. The effects of union mergers and internal restructuring:

    DEFF Research Database (Denmark)

    Navrbjerg, Steen Erik; Larsen, Trine Pernille

    2016-01-01

    Trade union mergers and restructuring are often seen as strategy for union revitalisation and renewal and have been ongoing in the majority of European trade unions. This paper explores how recent union mergers and internal restructuring has affected unions service provision, union democracy...... and interest representation. This is analysed drawing on longitudinal data from two Danish shop steward surveys conducted in 1998 and 2010, comparing shop stewards in merged and non-merged unions respectively. The main results are that although it could be expected that union mergers and internal restructuring......, where union size and less so the union’s recent merger and restructuring history appears to affect shop stewards’ relations with their unions....

  19. Development of Healthy Cities networks in Europe.

    Science.gov (United States)

    Goepel, Eberhard

    2007-01-01

    The Healthy Cities network in Europe was inspired by the Ottawa Charter for Health Promotion when it was launched in 1987. The networking process was initiated by the WHO Regional Office for Europe, but developed its own dynamics in different European countries during a time marked by fundamental political transformations in many of the countries of Eastern Europe. The networks then connected with the 'Local Agenda 21' and the 'Sustainable Cities and Towns Campaign' to create a new and broader programmatic agenda at the local level. In particular, the ''Aalborg plus 10 - commitments"--of local governments in 2004 have the potential to inspire a new phase of participatory and sustainable policies at the level of local communities in Europe. However, the extent to which these initiatives will influence the macro-politics of the European Union towards a proclaimed "Europe of Citizens" remains to be watched carefully during the coming years.

  20. Dam Construction in Lancang-Mekong River Basin Could Mitigate Future Flood Risk From Warming-Induced Intensified Rainfall: Dam Mitigate Flood Risk in Mekong

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Wei [Changjiang Institute of Survey, Planning, Design and Research, Wuhan China; Ministry of Education Key Laboratory for Earth System Modeling, Department of Earth System Science, Tsinghua University, Beijing China; Lu, Hui [Ministry of Education Key Laboratory for Earth System Modeling, Department of Earth System Science, Tsinghua University, Beijing China; Joint Center for Global Change Studies, Beijing China; Ruby Leung, L. [Pacific Northwest National Laboratory, Richland WA USA; Li, Hong-Yi [Department of Land Resources and Environmental Sciences and Institute on Ecosystems, Montana State University, Bozeman MT USA; Zhao, Jianshi [State Key Laboratory of Hydro-science and Engineering, Department of Hydraulic Engineering, Tsinghua University, Beijing China; Tian, Fuqiang [State Key Laboratory of Hydro-science and Engineering, Department of Hydraulic Engineering, Tsinghua University, Beijing China; Yang, Kun [Ministry of Education Key Laboratory for Earth System Modeling, Department of Earth System Science, Tsinghua University, Beijing China; Joint Center for Global Change Studies, Beijing China; Sothea, Khem [Mekong Institute of Cambodia, Phnom Penh Cambodia

    2017-10-25

    Water resources management, in particular flood control, in the Mekong River Basin (MRB) faces two key challenges in the 21st century: climate change and dam construction. A large scale distributed Geomorphology-Based Hydrological Model coupled with a simple reservoir regulation model (GBHM-MK-SOP) is used to investigate the relative effects of climate change and dam construction on the flood characteristics in the MRB. Results suggest an increase in both flood magnitude and frequency under climate change, which is more severe in the upstream basin and increases over time. However, dam construction and stream regulation reduce flood risk consistently throughout this century, with more obvious effects in the upstream basin where larger reservoirs will be located. The flood mitigation effect of dam regulation dominates over the flood intensification effect of climate change before 2060, but the latter emerges more prominently after 2060 and dominates the flood risk especially in the lower basin.

  1. Monitoring health in African dams : the Kamburu dam (Kenya) as a test case

    NARCIS (Netherlands)

    J.M.V. Oomen

    1981-01-01

    textabstractDams are among the obvious efforts to improve the economic situation in a developing country. They aim at using locally available natural resources. At present they are among the most popular means for promoting socio-economic development. A significant number of these programmes have

  2. Geophysical investigation of seepage beneath an earthen dam.

    Science.gov (United States)

    Ikard, S J; Rittgers, J; Revil, A; Mooney, M A

    2015-01-01

    A hydrogeophysical survey is performed at small earthen dam that overlies a confined aquifer. The structure of the dam has not shown evidence of anomalous seepage internally or through the foundation prior to the survey. However, the surface topography is mounded in a localized zone 150 m downstream, and groundwater discharges from this zone periodically when the reservoir storage is maximum. We use self-potential and electrical resistivity tomography surveys with seismic refraction tomography to (1) determine what underlying hydrogeologic factors, if any, have contributed to the successful long-term operation of the dam without apparent indicators of anomalous seepage through its core and foundation; and (2) investigate the hydraulic connection between the reservoir and the seepage zone to determine whether there exists a potential for this success to be undermined. Geophysical data are informed by hydraulic and geotechnical borehole data. Seismic refraction tomography is performed to determine the geometry of the phreatic surface. The hydro-stratigraphy is mapped with the resistivity data and groundwater flow patterns are determined with self-potential data. A self-potential model is constructed to represent a perpendicular profile extending out from the maximum cross-section of the dam, and self-potential data are inverted to recover the groundwater velocity field. The groundwater flow pattern through the aquifer is controlled by the bedrock topography and a preferential flow pathway exists beneath the dam. It corresponds to a sandy-gravel layer connecting the reservoir to the downstream seepage zone. © 2014, National Ground Water Association.

  3. Dam pre-release as an important operation strategy in reducing flood impact in Malaysia

    Science.gov (United States)

    Hidayah Ishak, Nurul; Mustafa Hashim, Ahmad

    2018-03-01

    The 2014 flood was reported to be one of the worst natural disaster has ever affected several states in the northern part of Peninsular Malaysia. Overwhelming rainfall was noted as one of the main factors causing such impact, which was claimed to be unprecedented to some extent. The state of Perak, which is blessed with four cascading dams had also experienced flood damage at a scale that was considered the worst in history. The rainfall received had caused the dam to reach danger level that necessitated additional discharge to be released. Safety of the dams was of great importance and such unavoidable additional discharge was allowed to avoid catastrophic failure of the dam structures. This paper discusses the dam pre-release as a significant dam management strategy in reducing flood impact. An important balance between required dam storage to be maintained and the risk element that can be afforded is the crucial factor in such enhanced operation strategy. While further possibility in developing a carefully engineered dam pre-release strategy can be explored for dam operation in Malaysia, this has already been introduced in some developed countries. Australia and South Africa are examples where pre-release has been practiced and proven to reduce flood risk. The concept involves controlling the dam lake level throughout the year, in reference to the rainfall data and the hydrological properties for the catchment area of the dams. Plentiful data analysis need to be done in contemplation of producing the optimal pre-release model. The amount of heavy rainfalls received is beyond human control but the distribution of the discharge from the dams can be further managed with the appropriate pre-release strategy.

  4. National Dam Safety Program. Woodward Dam (Inventory Number NY 507), Lower Hudson River Basin, Orange County, New York. Phase I Inspection Report,

    Science.gov (United States)

    1981-06-30

    omomrnuurI CONTENTS Location Plan Watershed Map Plate la : Field Sketch of Woodward Dam Plate Ib: Field Sketch of Greenleaf Dam Plate 2: Plan of Dam...goOFftkoww P L "mm alom+0a,0164m asm a Gooch~~A’~e mftLrrL - ol-ob o prat -n 4A ~ /e4 SojA S~tT IIV&-~ ~ i pqPiE5M 1%b, k&vs APPENDIX F...in ry flScrvice orflSi).. L I) Ip. lv.ay ConcrCLC Sp’%way Las j’ r. Joints Surfncc of S p 5.3i). y ’Mclarical Ar .Dra .o ~~~ LI:C azard Class E

  5. Three Sisters Dam: Investigations and monitoring

    International Nuclear Information System (INIS)

    Slopek, R.J.; Courage, L.J.R.; Keys, R.A.

    1990-01-01

    The geotechnical investigations, monitoring and interpretation of data associated with the evaluation of the Three Sisters Dam, which has been suffering from excessive seepage and is in need of enhancement, are outlined. The Three Sisters Dam is located in the continental ranges of the Rocky Mountains in Alberta, impounding the Spray Reservoir, and is founded on 60 m of interbedded sand, gravel, silt and clay layers. The computer code PC-SEEP was used to evaluate seepage. Details are provided of drilling, ground-penetrating radar surveys, seismic surveys, penstock inspection, sinkhole activity, piezometer monitoring, silt wells, settlement monuments, and tailrace monitoring. The intensive investigations of the foundations showed that they consist of a complex formation of interfingered stratified layers and leases of talus and glaciofluvial deposits. Due to the depth and nature of these materials drill hole penetration was limited to the use of the Becker hammer. This equipment successfully delineated the major soil horizons of the foundation. The continued information attained from inspection, drilling, testing, radar surveys, seismic work, monitoring of piezometers, leakage, silt wells and settlement monuments indicated that there are no large voids within the foundation of the dam. 2 refs., 12 figs

  6. Environmental risk assessment system for phosphogypsum tailing dams.

    Science.gov (United States)

    Sun, Xin; Ning, Ping; Tang, Xiaolong; Yi, Honghong; Li, Kai; Zhou, Lianbi; Xu, Xianmang

    2013-01-01

    This paper may be of particular interest to the readers as it provides a new environmental risk assessment system for phosphogypsum tailing dams. In this paper, we studied the phosphogypsum tailing dams which include characteristics of the pollution source, environmental risk characteristics and evaluation requirements to identify the applicable environmental risk assessment methods. Two analytical methods, that is, the analytic hierarchy process (AHP) and fuzzy logic, were used to handle the complexity of the environmental and nonquantitative data. Using our assessment method, different risk factors can be ranked according to their contributions to the environmental risk, thereby allowing the calculation of their relative priorities during decision making. Thus, environmental decision-makers can use this approach to develop alternative management strategies for proposed, ongoing, and completed PG tailing dams.

  7. Downstream ecological effects of dams: A geomorphic perspective

    International Nuclear Information System (INIS)

    Ligon, F.K.; Dietrich, W.E.; Trush, W.J.

    1995-01-01

    The damming of a river changes the flow of water, sediment, nutrients, energy, and biota, interrupting and altering most of a river's ecological processes. This article discusses the importance of geomorphological analysis in river conservation and management. To illustrate how subtle geomorphological adjustments may profoundly influence the ecological relationships downstream from dames, three case studies are presented. Then a geomorphically based approach for assessing and possibly mitigating some of the environmental effects of dams by tailoring dam designed and operation is outlined. The cases are as follows: channel simplification and salmon decline on the McKenzie River in Oregon; Channel incision and reduced floodplain inundation on the Oconee river in Georgia; Increased stability of a braided river in New Zealand's south island. 41 refs., 10 figs., 1 tab

  8. Protection Parameters against the Cracks by the Method of Volume Compensation Dam

    Directory of Open Access Journals (Sweden)

    Bulatov Georgiy

    2016-01-01

    Full Text Available This article provides estimates the parameters of protection from cracking dam due to volume compensation method. This article discusses the method of compensation dam volume. This method allows calculating the settings of security causing cracks the dam. Presents graphs of horizontal deformations of elongation calculated surface along the length of the construction and in time. Showing horizontal stress distribution diagram in the ground around the pile in plan and in section. Given all the necessary formulas for the method of compensation of the dam volume.

  9. Vocational Training in the European Union

    Directory of Open Access Journals (Sweden)

    Mehmet BALCI

    2013-01-01

    Full Text Available European Union requires some standards in all areas. Today, the importance of training qualified individuals which holds an important place in the development of countries increases and certain standards are adopted creating common European Union tools in the field of vocational and technical education. In this study, vocational education and training policies system and the standards adopted by the European Union are discussed. Furthermore, this study was accepted as a European Union project in 2010 and the results obtained from the Leonardo Da Vinci Life Learning European Union project called “Web Based Basic Vocational Training” between the years 2010-2012 were presented. Since the partners of these projects are Turkey, Spain and Germany, the structure of vocational education, institutions of public and private vocational education and the diplomas and certificates entitled after these educations are included. As Turkey is on its way to become a European Union member, a number of advices are presented for Turkey to reach its destination about vocational education standards that European Union has aimed. The purpose of the study is not only to be a guide for the young who want to get professional training in the countries that are European Union members or candidates about how and where to have education opportunities but also to give a chance for trainers and training managers, participating in vocational training, so as to glimpse different practices from different countries and compare these practices between the countries of European Union and their countries. The study is also very important as it has the opportunities for training managers to see if their countries' vocational education is close enough to vocational education in European Union.

  10. Experimental study on mechanism and shape characteristics of suspended flexible dam

    Science.gov (United States)

    Wang, Jian-zhong; Fan, Hong-xia; Zhu, Li-jun

    2014-12-01

    Hydraulic structures such as groin, longitudinal dike and seawall are common in water conservancy and water transportation engineering projects at home and abroad, which have long been dominated by solid mass structural form. With brush and stone as building materials, this kind of structure has an obvious engineering effect. However, it not only requires huge capital investments, but also has negative impacts on the ecological environment. The suspended flexible dam is an innovative engineering measure, and few theoretical and experimental researches of this type dam can be found at present. This paper studies the mechanism and shape characteristics of this dam and obtains the dynamic equilibrium equation of flexible dam, the float buoyancy expression, and the condition for transformation among three forms of the underwater shape of the dam. The results are valuable in engineering application and can be used as the reference for the future work due to the distinctive design philosophy, the small negative effects on environment and the consistency for sustainable development.

  11. Towards realistic design of wind dams: An innovative approach to enhance wind potential

    International Nuclear Information System (INIS)

    Tajeddin, Alireza; Fazelpour, Farivar

    2016-01-01

    Highlights: • An innovative methodology to increase the wind potential. • Introducing new generation of wind dams and underground wind farms. • Reducing the environmental impacts of employing conventional wind farms. • An efficient method to employ low wind speeds. - Abstract: In an attempt to discover alternative energy sources to fossil fuels which are being depleted on the increase, Renewable Energy Sources (RES) have gained considerable attention in recent years. RESs are also represented as clean sources; emitting comparatively lower Greenhouse Gases (GHGs) emissions; thus, they are climate friendly. Among RESs, wind energy is one of the most abundant and increasingly cost-competitive energy resources, and it is becoming the fastest growing source of electricity in the world. Regarding the improvement of wind power, one of the key aspects that must be considered is achieving enhanced reliability and efficiency at once. In this paper, we introduced and applied an innovative method to make wind dam which is a new approach to wind farms’ site selection for production of electricity. The proposed method enhances the wind potential by means of a natural or artificial barrier such as a hill, and is supported by analytical expressions and Computational Fluid Dynamics (CFD) models. A systematic case study has been designed at a site near the city of Tehran, Iran, and an analytical method has been applied that includes meteorological data analysis, CFD modeling along with energy power and economic assessment.

  12. Physicochemical Characteristics of River Water Downstream of a Large Tropical Hydroelectric Dam

    Directory of Open Access Journals (Sweden)

    Teck-Yee Ling

    2016-01-01

    Full Text Available Water quality in the downstream river of a hydroelectric dam may be affected by the structural design and operation. To date, little is known about the water quality downstream of the largest dam in Malaysia, the Bakun hydroelectric dam. Therefore, the objective of the study was to determine the water quality downstream of the dam when the spillway was closed and when it was opened. Results of the study indicate that the dam plays a significant role in regulating the water quality downstream of it. When the spillway was closed, pH and oxygen were lower in the river where DO was below 5 mg/L. When the spillway was opened, the water quality improved in terms of oxygen content (>8.0 mg/L, total sulphide (TS, and chemical oxygen demand (COD but deteriorated in terms of five-day biochemical oxygen demand (BOD5, total ammonia nitrogen (TAN, and total phosphorus (TP. Additionally, the intensity of the impacts, particularly BOD5, COD, and TAN, shows a declining trend as distance from the dam increases. This study shows that impacts on the water quality extend to a distance of 32 km from the dam particularly turbidity and DO and opening the spillway changes the water quality significantly.

  13. The underwater installation of a drained geomembrane system on Lost Creek Dam

    International Nuclear Information System (INIS)

    Onken, S.; Harlan, R.C.; Wilkes, J.; Vaschetti, G.

    1998-01-01

    Lost Creek Dam was constructed in California around 1923. It is a 122 foot high concrete arch dam with a crest elevation of 3,287 feet and a crest length of 490 feet. Over the years, the dam and the condition of the concrete face have deteriorated. The concrete is porous and seeps water along the entire downstream face. In winter, the seeping water freezes, penetrates the concrete and causes expansion and spalling of the concrete surface. In some places, the concrete has very low strength to a depth of a foot or more, rendering the dam only marginally safe. Seven mitigative measures were identified as possible solutions to the problem. It was determined that the seepage of the water through the concrete dam could be stopped with the installation of a geomembrane to the upstream face. This paper describes the unique underwater installation of a drained geomembrane system on the concrete face of the dam. This was the first ever installation of a drained geomembrane system on an entire dam using divers. Monitoring will determine the success of the project, and whether the seepage of the water through the porous concrete had been reduced sufficiently to stop the deterioration of the concrete on the downstream face. 2 refs., 12 figs

  14. Hydroelectric dams need billions for rehab

    International Nuclear Information System (INIS)

    Carr, F.H.; Soast, A.

    1993-01-01

    Many of the Corps of Engineers older hydroelectric dams will require major rehabilitation over the next ten years. Preventive maintenance, repair work, and major rehabilitation of the Corp's hydro dams in inadequate because the revenue generated by sales of electricity, by law, is returned to the Treasury. Most multimillion dollar rehabilitation projects require specific approval for funding by Congress and securing it is a long and difficult process. It is hoped the funding problem will soon be addressed by the Clinton administration. Already, nearly one-sixth of the 2,154 Mw of hydro is unavailable because with hydro units are either out of service or operating at less than full capacity

  15. 33 CFR 208.32 - Sanford Dam and Lake Meredith, Canadian River, Tex.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Sanford Dam and Lake Meredith... OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.32 Sanford Dam and Lake Meredith, Canadian River, Tex. The Bureau of Reclamation, or its designated agent, shall operate the Sanford Dam and...

  16. 33 CFR 208.34 - Norman Dam and Lake Thunderbird, Little River, Okla.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Norman Dam and Lake Thunderbird... OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.34 Norman Dam and Lake Thunderbird, Little River, Okla. The Bureau of Reclamation, or its designated agent, shall operate Norman Dam and Lake...

  17. Grouting of the cracks in the Arch 5-6 Daniel Johnson dam

    International Nuclear Information System (INIS)

    Lariviere, R.; Routhier, L.; Roy, V.; Saleh, K.; Tremblay, S.

    1999-01-01

    The Daniel-Johnson dam is located 800 km northeast of Montreal, PQ, and is 1314 m in length and 214 m high. Just after completion of dam construction different types of cracks started to appear on the upstream and downstream faces. During and after the construction of the dam, numerous cracks and joints were grouted in order to reduce water infiltration. In some cases, as a result of high injection pressures and inaccurate methods, the injections provoked the propagation of the existing cracks or the initiation of new ones. Because of this situation and to determine the contribution of injection to dam safety, in 1985, Hydro-Quebec applied a moratorium on all future injection work on the dam. Research work was initiated in 1986 in the areas of grouting materials, methods, equipment and behavioral analysis to establish a safe method for the injection of the cracks. A committee was formed in 1993 with members from various groups, in order to: carry out extensive behavioral analysis of the Arch 5-6 dam, carry out an investigation program in order to determine the cause of the increase of the water infiltration, undertake a structural analysis program in order to evaluate the impact of an injection on the safety of the dam, and identify the proper method and injection products to use. In 1997, as a result of the progress of the structural analysis studies and the injection research project, a decision was made to proceed with the injection of the dam. A description is included of the results of the investigation, recommendations and results of the injection research project, as well as some details of the grouting campaign carried out in January 1999. On the whole, a better knowledge was acquired of the structure, of the plunging cracks and the behaviour of the dam during the injection. In the field of injection methods, materials and equipment, research work was invaluable when it came to the injection of micro-fine cracks in concrete dams. 5 refs., 8 figs

  18. Crotch Lake dam rehabilitation project

    International Nuclear Information System (INIS)

    Brunet, G.; Dobrowolski, E.

    1999-01-01

    Replacement of the existing wood crib dam structure on Crotch Lake on the Mississippi River in eastern Ontario that provided water storage for the power production at High Falls Generating Station, became necessary when it was determined that the dam did not meet Ontario-Hydro's safety standards. This paper describes the project of replacing the existing structure with a PVC coated gabion wall with waterproofing. The entire structure was covered with three layers of wire mesh, laced together, and criss-crossed for superior strength and rigidity. The work was completed in 28 days with no environmental impact . Life expectancy of the new structure is in excess of 40 years. With periodic maintenance of the gabion mat cover, life span could be extended an additional 20 to 40 years. 5 figs

  19. Stability Analysis Of Earth Dam Slopes Subjected To Earthquake Using ERT Results Interpretation

    Directory of Open Access Journals (Sweden)

    Eko Andi Suryo

    2018-01-01

    Full Text Available Earth Dam stability can be affected significantly by the existence of excessive leakage. This is due to decreasing of shear strength of the dam material and additional overturning moment. In such scenario, the non-destructive soil investigation method is needed to analyze the stability of earth dam in current condition. This paper examines the use of Electrical Resistivity Tomography (ERT to investigate soil layers and to measure parameters of soil shear strength indirectly. First survey was carried out at dam crest and downstream using Wenner Configuration along profile lines at electrode spacing of 5 m. There were 5 profile lines of 180m long each and 10m distance of spacing. Furthermore, two profiles lines at weak cross-section based on its resistivity soil values were undertaken. Laboratory tests were conducted to determine relationship between resistivity value, moisture content, cohesion and angle of friction for each type of dam materials. From the ERT results and lab testing, a model dam can be obtained using current material parameters to perform stability analysis of dam subjected to earthquake. The lowest FOS was found at the upstream side about 1.15 and at the downstream side about 1.14 after applying seismic load of 100 years return period. Keywords: Stability Analysis, ERT,resistivity, leakage, dam

  20. Impact of Dams on Riparian Frog Communities in the Southern Western Ghats, India

    Directory of Open Access Journals (Sweden)

    Rohit Naniwadekar

    2014-08-01

    Full Text Available The Western Ghats is a global biodiversity hotspot and home to diverse and unique assemblages of amphibians. Several rivers originate from these mountains and hydropower is being tapped from them. The impacts of hydrological regulation of riparian ecosystems to wildlife and its habitat are poorly documented, and in particular the fate of frog populations is unknown. We examined the effects of dams on riparian frog communities in the Thamirabarani catchment in southern Western Ghats. We used nocturnal visual encounter surveys constrained for time, to document the species richness of frogs below and above the dam, and also at control sites in the same catchment. While we did not find differences in species richness below and above the dams, the frog community composition was significantly altered as a likely consequence of altered flow regime. The frog species compositions in control sites were similar to above-dam sites. Below-dam sites had a distinctly different species composition. Select endemic frog species appeared to be adversely impacted due to the dams. Below-dam sites had a greater proportion of generalist and widely distributed species. Dams in the Western Ghats appeared to adversely impact population of endemic species, particularly those belonging to the genus Nyctibatrachus that shows specialization for intact streams.

  1. Performance of heterogeneous earthfill dams under earthquakes: optimal location of the impervious core

    Directory of Open Access Journals (Sweden)

    S. López-Querol

    2008-01-01

    Full Text Available Earthfill dams are man-made geostructures which may be especially damaged by seismic loadings, because the soil skeleton they are made of suffers remarkable modifications in its mechanical properties, as well as changes of pore water pressure and flow of this water inside their pores, when subjected to vibrations. The most extreme situation is the dam failure due to soil liquefaction. Coupled finite element numerical codes are a useful tool to assess the safety of these dams. In this paper the application of a fully coupled numerical model, previously developed and validated by the authors, to a set of theoretical cross sections of earthfill dams with impervious core, is presented. All these dams are same height and have the same volume of impervious material at the core. The influence of the core location inside the dam on its response against seismic loading is numerically explored. The dams are designed as strictly stable under static loads. As a result of this research, a design recommendation on the location of the impervious core is obtained for this type of earth dams, on the basis of the criteria of minor liquefaction risk, minor soil degradation during the earthquake and minor crest settlement.

  2. Identification of Cracked Zone in Sutami dam Using Geoelectrical Method

    Directory of Open Access Journals (Sweden)

    Fina Fitriah

    2015-12-01

    Full Text Available We identified the craked zones based on geoelectrical resistivity method in Sutami Dam. There are four lines measurement of geoelectrical resistivity method with a length of 380-400 meters. The direction of each line is from the northeast to the southwest. All of the tracks are located at the top of Sutami Dam i.e. two tracks in the upstream and the others in the downstream. From the analysis we found that the lithology is detected by geoelectrical resistivty method showed two layers of design of Sutami Dam. The two layers that are detected are transition zone and filter zone. Transition zone consists of sandstone rock containing water (0.922 Ωm-9.57 Ωm and dry sandstone (>9.57 Ωm-320 Ωm. Filter zone consists of sand (>320 Ωm-4410 Ωm. Cracked zones spread in the upstream, downstream, and roadway at the top of Sutami Dam which are indicated by the presence of low resistivity (0.922 Ωm-9.57 Ωm based on 3D processing of data of geoelectrical resistivity. The distribution of cracked zone indicates that Sutami Dam is susceptible to ground movement.

  3. Risk analysis of gravity dam instability using credibility theory Monte Carlo simulation model.

    Science.gov (United States)

    Xin, Cao; Chongshi, Gu

    2016-01-01

    Risk analysis of gravity dam stability involves complicated uncertainty in many design parameters and measured data. Stability failure risk ratio described jointly by probability and possibility has deficiency in characterization of influence of fuzzy factors and representation of the likelihood of risk occurrence in practical engineering. In this article, credibility theory is applied into stability failure risk analysis of gravity dam. Stability of gravity dam is viewed as a hybrid event considering both fuzziness and randomness of failure criterion, design parameters and measured data. Credibility distribution function is conducted as a novel way to represent uncertainty of influence factors of gravity dam stability. And combining with Monte Carlo simulation, corresponding calculation method and procedure are proposed. Based on a dam section, a detailed application of the modeling approach on risk calculation of both dam foundation and double sliding surfaces is provided. The results show that, the present method is feasible to be applied on analysis of stability failure risk for gravity dams. The risk assessment obtained can reflect influence of both sorts of uncertainty, and is suitable as an index value.

  4. An application of extreme value theory to the management of a hydroelectric dam.

    Science.gov (United States)

    Minkah, Richard

    2016-01-01

    Assessing the probability of very low or high water levels is an important issue in the management of hydroelectric dams. In the case of the Akosombo dam, very low and high water levels result in load shedding of electrical power and flooding in communities downstream respectively. In this paper, we use extreme value theory to estimate the probability and return period of very low water levels that can result in load shedding or a complete shutdown of the dam's operations. In addition, we assess the probability and return period of high water levels near the height of the dam and beyond. This provides a framework for a possible extension of the dam to sustain the generation of electrical power and reduce the frequency of spillage that causes flooding in communities downstream. The results show that an extension of the dam can reduce the probability and prolong the return period of a flood. In addition, we found a negligible probability of a complete shutdown of the dam due to inadequate water level.

  5. Research on Safety Monitoring System of Tailings Dam Based on Internet of Things

    Science.gov (United States)

    Wang, Ligang; Yang, Xiaocong; He, Manchao

    2018-03-01

    The paper designed and implemented the safety monitoring system of tailings dam based on Internet of things, completed the hardware and software design of sensor nodes, routing nodes and coordinator node by using ZigBee wireless sensor chip CC2630 and 3G/4G data transmission module, developed the software platform integrated with geographic information system. The paper achieved real-time monitoring and data collection of tailings dam dam deformation, seepage line, water level and rainfall for all-weather, the stability of tailings dam based on the Internet of things monitoring is analyzed, and realized intelligent and scientific management of tailings dam under the guidance of the remote expert system.

  6. Monitoring Thermal Pollution in Rivers Downstream of Dams with Landsat ETM+ Thermal Infrared Images

    Directory of Open Access Journals (Sweden)

    Feng Ling

    2017-11-01

    Full Text Available Dams play a significant role in altering the spatial pattern of temperature in rivers and contribute to thermal pollution, which greatly affects the river aquatic ecosystems. Understanding the temporal and spatial variation of thermal pollution caused by dams is important to prevent or mitigate its harmful effect. Assessments based on in-situ measurements are often limited in practice because of the inaccessibility of water temperature records and the scarcity of gauges along rivers. By contrast, thermal infrared remote sensing provides an alternative approach to monitor thermal pollution downstream of dams in large rivers, because it can cover a large area and observe the same zone repeatedly. In this study, Landsat Enhanced Thematic Mapper Plus (ETM+ thermal infrared imagery were applied to assess the thermal pollution caused by two dams, the Geheyan Dam and the Gaobazhou Dam, located on the Qingjiang River, a tributary of the Yangtze River downstream of the Three Gorges Reservoir in Central China. The spatial and temporal characteristics of thermal pollution were analyzed with water temperatures estimated from 54 cloud-free Landsat ETM+ scenes acquired in the period from 2000 to 2014. The results show that water temperatures downstream of both dams are much cooler than those upstream of both dams in summer, and the water temperature remains stable along the river in winter, showing evident characteristic of the thermal pollution caused by dams. The area affected by the Geheyan Dam reaches beyond 20 km along the downstream river, and that affected by the Gaobazhou Dam extends beyond the point where the Qingjiang River enters the Yangtze River. Considering the long time series and global coverage of Landsat ETM+ imagery, the proposed technique in the current study provides a promising method for globally monitoring the thermal pollution caused by dams in large rivers.

  7. Effects of dams and geomorphic context on riparian forests of the Elwha River, Washington

    Science.gov (United States)

    Shafroth, Patrick B.; Perry, Laura G; Rose, Chanoane A; Braatne, Jeffrey H

    2016-01-01

    Understanding how dams affect the shifting habitat mosaic of river bottomlands is key for protecting the many ecological functions and related goods and services that riparian forests provide and for informing approaches to riparian ecosystem restoration. We examined the downstream effects of two large dams on patterns of forest composition, structure, and dynamics within different geomorphic contexts and compared them to upstream reference conditions along the Elwha River, Washington, USA. Patterns of riparian vegetation in river segments downstream of the dams were driven largely by channel and bottomland geomorphic responses to a dramatically reduced sediment supply. The river segment upstream of both dams was the most geomorphically dynamic, whereas the segment between the dams was the least dynamic due to substantial channel armoring, and the segment downstream of both dams was intermediate due to some local sediment supply. These geomorphic differences were linked to altered characteristics of the shifting habitat mosaic, including older forest age structure and fewer young Populus balsamifera subsp. trichocarpa stands in the relatively static segment between the dams compared to more extensive early-successional forests (dominated by Alnus rubra and Salix spp.) and pioneer seedling recruitment upstream of the dams. Species composition of later-successional forest communities varied among river segments as well, with greater Pseudotsuga menziesii and Tsuga heterophylla abundance upstream of both dams, Acer spp. abundance between the dams, and P. balsamifera subsp. trichocarpa and Thuja plicata abundance below both dams. Riparian forest responses to the recent removal of the two dams on the Elwha River will depend largely on channel and geomorphic adjustments to the release, transport, and deposition of the large volume of sediment formerly stored in the reservoirs, together with changes in large wood dynamics.

  8. Report on Auscultation of the Arenal's Dam P. H. Arenal

    International Nuclear Information System (INIS)

    1994-09-01

    The Costa Rican Electricity Institute (Instituto Costarricense de Electricidad), always has been worried to verify the good state of the works and thus to guarantee its operation. For that reason, it has established different sorts of auscultation to the Arenal's Dam. This report analyzes the geo-hydraulic, structural and topographic auscultation. It also includes information about the new techniques used by the ARCAL XVIII RLA/8/018; application of Tracer Techniques for the study of water leakage in dams and damming projects. (author). 18 charts, 2 maps, 4 tabs

  9. Environmental Risk Assessment System for Phosphogypsum Tailing Dams

    OpenAIRE

    Xin Sun; Ping Ning; Xiaolong Tang; Honghong Yi; Kai Li; Lianbi Zhou; Xianmang Xu

    2013-01-01

    This paper may be of particular interest to the readers as it provides a new environmental risk assessment system for phosphogypsum tailing dams. In this paper, we studied the phosphogypsum tailing dams which include characteristics of the pollution source, environmental risk characteristics and evaluation requirements to identify the applicable environmental risk assessment methods. Two analytical methods, that is, the analytic hierarchy process (AHP) and fuzzy logic, were used to handle the...

  10. The social impacts of dams: A new framework for scholarly analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kirchherr, Julian, E-mail: julian.kirchherr@sant.ox.ac.uk; Charles, Katrina J., E-mail: katrina.charles@ouce.ox.ac.uk

    2016-09-15

    No commonly used framework exists in the scholarly study of the social impacts of dams. This hinders comparisons of analyses and thus the accumulation of knowledge. The aim of this paper is to unify scholarly understanding of dams' social impacts via the analysis and aggregation of the various frameworks currently used in the scholarly literature. For this purpose, we have systematically analyzed and aggregated 27 frameworks employed by academics analyzing dams' social impacts (found in a set of 217 articles). A key finding of the analysis is that currently used frameworks are often not specific to dams and thus omit key impacts associated with them. The result of our analysis and aggregation is a new framework for scholarly analysis (which we call ‘matrix framework’) specifically on dams' social impacts, with space, time and value as its key dimensions as well as infrastructure, community and livelihood as its key components. Building on the scholarly understanding of this topic enables us to conceptualize the inherently complex and multidimensional issues of dams' social impacts in a holistic manner. If commonly employed in academia (and possibly in practice), this framework would enable more transparent assessment and comparison of projects.

  11. Nonparametric Change Point Diagnosis Method of Concrete Dam Crack Behavior Abnormality

    Directory of Open Access Journals (Sweden)

    Zhanchao Li

    2013-01-01

    Full Text Available The study on diagnosis method of concrete crack behavior abnormality has always been a hot spot and difficulty in the safety monitoring field of hydraulic structure. Based on the performance of concrete dam crack behavior abnormality in parametric statistical model and nonparametric statistical model, the internal relation between concrete dam crack behavior abnormality and statistical change point theory is deeply analyzed from the model structure instability of parametric statistical model and change of sequence distribution law of nonparametric statistical model. On this basis, through the reduction of change point problem, the establishment of basic nonparametric change point model, and asymptotic analysis on test method of basic change point problem, the nonparametric change point diagnosis method of concrete dam crack behavior abnormality is created in consideration of the situation that in practice concrete dam crack behavior may have more abnormality points. And the nonparametric change point diagnosis method of concrete dam crack behavior abnormality is used in the actual project, demonstrating the effectiveness and scientific reasonableness of the method established. Meanwhile, the nonparametric change point diagnosis method of concrete dam crack behavior abnormality has a complete theoretical basis and strong practicality with a broad application prospect in actual project.

  12. Underground dams for irrigation supplies in coastal limestone aquifer, Okinawa, Japan

    Science.gov (United States)

    Yasumoto, J.; Nakano, T.; Nawa, N.

    2011-12-01

    The use of underground dams to store water in regions with arid or tropical climates is a method that has received considerable attention in the last few decades. And now, for the tropical and subtropical islands that are highly vulnerable to climate change underground dams have been attracting attention again as a method of groundwater management. Okinawa Prefecture is Japan's southernmost prefecture, which consists of hundreds of islands in a chain over 1,000 km long, called the Ryukyu Islands which extend southwest from Kyushu to Taiwan. The national irrigation project of the Ryukyu Islands has been carried out, and several underground dams have been constructed. The Komesu and Giiza underground dams are first full scale underground dam facilities constructed for irrigation in Japan. The Komesu underground dam is a salt-water proof type. It prevents salt-water intrusion and provides storage fresh-water for irrigation in coastal limestone aquifer. Giiza underground dam is a dam up type for storage of fresh-water. These groundwater reservoirs are located in the coastal region of southern part of Okinawa (main island), where Ryukyu limestone is extensively distributed. We studied the behaviour of groundwater flow, saltwater intrusion and nitrate nitrogen (NO3-N) in groundwater in this region by using observation data of groundwater and springs through long term (from 1993 to 2010) monitoring. And, a groundwater flow and salt-water intrusion analysis have been conducted with three dimensional numerical model applied to these dam reservoir areas. The MODFLOW-NWT with SWI code and PEST was used to simulate the complex groundwater flow patterns. Through the comparison with simulation and observed data, it was concluded that the cut off wall of underground dams effectively stores the groundwater and prevents the salt-water intrusion in the reservoir areas. The observed groundwater levels at the reservoir areas were almost reproduced by the numerical model, but there

  13. Person-city personality fit and entrepreneurial success: An explorative study in China.

    Science.gov (United States)

    Zhou, Mingjie; Zhou, Yixin; Zhang, Jianxin; Obschonka, Martin; Silbereisen, Rainer K

    2017-08-13

    While the study of personality differences is a traditional psychological approach in entrepreneurship research, economic research directs attention towards the entrepreneurial ecosystems in which entrepreneurial activity are embedded. We combine both approaches and quantify the interplay between the individual personality make-up of entrepreneurs and the local personality composition of ecosystems, with a special focus on person-city personality fit. Specifically, we analyse personality data from N = 26,405 Chinese residents across 42 major Chinese cities, including N = 1091 Chinese entrepreneurs. Multi-level polynomial regression and response surface plots revealed that: (a) individual-level conscientiousness had a positive effect and individual-level agreeableness and neuroticism had a negative effect on entrepreneurial success, (b) city-level conscientiousness had a positive, and city-level neuroticism had a negative effect on entrepreneurial success, and (c) additional person-city personality fit effects existed for agreeableness, conscientiousness and neuroticism. For example, entrepreneurs who are high in agreeableness and conduct their business in a city with a low agreeableness level show the lowest entrepreneurial success. In contrast, entrepreneurs who are low in agreeableness and conduct their business in a city with a high agreeableness level show relatively high entrepreneurial success. Implications for research and practice are discussed. © 2017 International Union of Psychological Science.

  14. Unions in small and medium-sized enterprises

    DEFF Research Database (Denmark)

    Holten, Ann-Louise; Crouch, Colin

    2014-01-01

    Trade unions are commonly weak in small- and medium-sized enterprises, which constitute a majority of European firms and are often family-owned. We investigate the influence of family ownership on employee membership, perceptions and experience with unions in Danish and Italian firms in the textile...... and clothing sector. Family ownership reduces union membership; and within family firms, the number of family members employed is negatively associated with unionization rates and employee perceptions of unions....

  15. Geomorphic and Ecological Issues in Removal of Sediment-Filled Dams in the California Coast Ranges (Invited)

    Science.gov (United States)

    Kondolf, G. M.; Oreilly, C.

    2010-12-01

    Water-supply reservoirs in the actively eroding California Coast Ranges are vulnerable to sediment filling, thus creating obsolete impounding dams (Minear & Kondolf 2009). Once full of sediment, there is more impetus to remove dams for public safety and fish passage, but managing accumulated sediments becomes a dominant issue in dam removal planning. We analyzed the planning process and sediment management analyses for five dams, all of which have important ecological resources but whose dam removal options are constrained by potential impacts to downstream urban populations. Ringe Dam on Malibu Ck, Matilija Dam on the Ventura River, Searsville Dam on San Francisquito Ck, and Upper York Creek Dam on York Ck cut off important habitat for anadromous steelhead trout (Oncorhynchus mykiss). San Clemente Dam on the Carmel River has a working fish ladder, but only some of the migratory steelhead use it. By virtue of having filled with sediment, all five dams are at greater risk of seismic failure. San Clemente Dam is at greater risk because its foundation is on alluvium (not bedrock), and the poor-quality concrete in Matilija Dam is deteriorating from an akali-aggregate reaction. Simply removing the dams and allowing accumulated sediments to be transported downstream is not an option because all these rivers have extremely expensive houses along downstream banks and floodplains, so that allowing the downstream channel to aggrade with dam-dervied sediments could expose agencies to liability for future flood losses. Analyses of potential sediment transport have been based mostly on application of tractive force models, and have supported management responses ranging from in-situ stabilization (San Clemente and Matilija) to removal of stored sediment (York) to annual dredging to maintain capacity and prevent sediment passing over the dam (proposed for Searsville).

  16. Removing Dams, Constructing Science: Coproduction of Undammed Riverscapes by Politics, Finance, Environment, Society and Technology

    Directory of Open Access Journals (Sweden)

    Zbigniew J. Grabowski

    2017-10-01

    Full Text Available Dam removal in the United States has continued to increase in pace and scope, transitioning from a dam-safety engineering practice to an integral component of many large-scale river restoration programmes. At the same time, knowledge around dam removals remains fragmented by disciplinary silos and a lack of knowledge transfer between communities of practice around dam removal and academia. Here we argue that dam removal science, as a study of large restoration-oriented infrastructure interventions, requires the construction of an interdisciplinary framework to integrate knowledge relevant to decision-making on dam removal. Drawing upon infrastructure studies, relational theories of coproduction of knowledge and social life, and advances within restoration ecology and dam removal science, we present a preliminary framework of dams as systems with irreducibly interrelated political, financial, environmental, social, and technological dimensions (PFESTS. With this framework we analyse three dam removals occurring over a similar time period and within the same narrow geographic region (the Mid-Columbia Region in WA and OR, USA to demonstrate how each PFESTS dimension contributed to the decision to remove the dam, how it affected the process of removing the dam, and how those dimensions continue to operate post removal in each watershed. We conclude with a discussion of a joint research and practice agenda emerging out of the PFESTS framing.

  17. Oldman river dam mitigation program downstream vegetation project report, Volume II: The potential effects of an operating plan for the Oldman River dam on Riparian cottonwood forests

    Energy Technology Data Exchange (ETDEWEB)

    Mahoney, J.M.

    1993-01-01

    Extensive cottonwood (poplar) forests exist in the Oldman River valley downstream of the Oldman River dam. Studies of similar forests in nearby river valleys and elsewhere on the western prairies have found significant declines of some riparian forests following river damming. This investigation was initiated to determine the causes of cottonwood forest decline downstream from existing dams in southern Alberta; inventory the existing river valley forests in the Oldman Basin; establish study sites in the Oldman River forests to monitor changes in forest status following commissioning of the Oldman River dam, and evaluate the probable impact of proposed operating plans for the Oldman River dam and associated water control structures on downstream forests. This report summarizes the progress made in the analyses of the probable effects on the survival of the forests, including a discussion of the hydrological conditions essential for cottonwood forest regeneration and an explanation of the effects of altering these characteristics on riparian forests; the hydrological alterations expected along various river reaches in the Oldman Basin with the implementation of the proposed OD05 Oldman Dam operating plan; and preliminary analyses of the problem impacts of the OD05 operating plan on the cottonwood forests along these reaches.

  18. Trading river services: optimizing dam decisions at the basin scale to improve socio-ecological resilience

    Science.gov (United States)

    Roy, S. G.; Gold, A.; Uchida, E.; McGreavy, B.; Smith, S. M.; Wilson, K.; Blachly, B.; Newcomb, A.; Hart, D.; Gardner, K.

    2017-12-01

    Dam removal has become a cornerstone of environmental restoration practice in the United States. One outcome of dam removal that has received positive attention is restored access to historic habitat for sea-run fisheries, providing a crucial gain in ecosystem resilience. But dams also provide stakeholders with valuable services, and uncertain socio-ecological outcomes can arise if there is not careful consideration of the basin scale trade offs caused by dam removal. In addition to fisheries, dam removals can significantly affect landscape nutrient flux, municipal water storage, recreational use of lakes and rivers, property values, hydroelectricity generation, the cultural meaning of dams, and many other river-based ecosystem services. We use a production possibility frontiers approach to explore dam decision scenarios and opportunities for trading between ecosystem services that are positively or negatively affected by dam removal in New England. Scenarios that provide efficient trade off potentials are identified using a multiobjective genetic algorithm. Our results suggest that for many river systems, there is a significant potential to increase the value of fisheries and other ecosystem services with minimal dam removals, and further increases are possible by including decisions related to dam operations and physical modifications. Run-of-river dams located near the head of tide are often found to be optimal for removal due to low hydroelectric capacity and high impact on fisheries. Conversely, dams with large impoundments near a river's headwaters can be less optimal for dam removal because their value as nitrogen sinks often outweighs the potential value for fisheries. Hydropower capacity is negatively impacted by dam removal but there are opportunities to meet or exceed lost capacity by upgrading preserved hydropower dams. Improving fish passage facilities for dams that are critical for safety or water storage can also reduce impacts on fisheries. Our

  19. CFC legislation in the European Union

    Directory of Open Access Journals (Sweden)

    Cvjetković Cvjetana M.

    2015-01-01

    Full Text Available In this paper the author considers CFC legislation in the Member States of the European Union, and points to the official attitude of the institutions of the European Union toward CFC legislation. Special attention in this paper is focused on Judgment of the Court of Justice of the European Union in the case Cadbury Schweppes. The aim of the paper is to analyze CFC legislation in the Member States in order to determine its basic characteristics, as well as to determine its compatibility with freedoms guaranteed by the primary law of the European Union, i.e. with Judgment of the Court of Justice of the European Union in the Cadbury Schweppes case.

  20. ETUDE - European Trade Union Distance Education.

    Science.gov (United States)

    Creanor, Linda; Walker, Steve

    2000-01-01

    Describes transnational distance learning activities among European trade union educators carried out as part of the European Trade Union Distance Education (ETUDE) project, supported by the European Commission. Highlights include the context of international trade union distance education; tutor training course; tutors' experiences; and…

  1. Geomorphic and habitat response to a large-dam removal in a Mediterranean river

    Science.gov (United States)

    Harrison, L.; East, A. E.; Smith, D. P.; Bond, R.; Logan, J. B.; Nicol, C.; Williams, T.; Boughton, D. A.; Chow, K.

    2017-12-01

    The presence of large dams has fundamentally altered physical and biological processes in riverine ecosystems, and dam removal is becoming more common as a river restoration strategy. We used a before-after-control-impact study design to investigate the geomorphic and habitat response to removal of 32-m-high San Clemente Dam on the Carmel River, CA. The project represents the first major dam removal in a Mediterranean river and is also unique among large dam removals in that most reservoir sediment was sequestered in place. We found that in the first year post-removal, a sediment pulse migrated 3.5 km downstream, filling pools and the interstitial pore spaces of gravels with sand. These sedimentary and topographic changes initially reduced the overall quality of steelhead (O. mykiss) spawning and rearing habitat in impacted reaches. Over the second winter after dam removal, a sequence of high flows flushed large volumes of sand from pools and mobilized the river bed throughout much of the active channel. The floods substantially altered fluvial evolution in the upper part of the reservoir, promoting new avulsion and the subsequent delivery of gravel and large wood to below dam reaches. These geomorphic processes increased the availability of spawning-sized gravel and enhanced channel complexity in reaches within several km of the former dam, which should improve habitat for multiple life stages of steelhead. Results indicate that when most reservoir sediment remains impounded, high flows become more important drivers of geomorphic and habitat change than dam removal alone. In such cases, the rates at which biophysical processes are reestablished will depend largely on post-dam removal flow sequencing and the upstream supply of sediment and large wood.

  2. Adolescent Violent Victimization and Precocious Union Formation.

    Science.gov (United States)

    C Kuhl, Danielle; Warner, David F; Wilczak, Andrew

    2012-11-01

    This article bridges scholarship in criminology and family sociology by extending arguments about "precocious exits" from adolescence to consider early union formation as a salient outcome of violent victimization for youths. Research indicates that early union formation is associated with several negative outcomes; yet the absence of attention to union formation as a consequence of violent victimization is noteworthy. We address this gap by drawing on life course theory and data from the National Longitudinal Study of Adolescent Health (Add Health) to examine the effect of violent victimization ("street" violence) on the timing of first co-residential union formation-differentiating between marriage and cohabitation-in young adulthood. Estimates from Cox proportional hazard models show that adolescent victims of street violence experience higher rates of first union formation, especially marriage, early in the transition to adulthood; however, this effect declines with age, as such unions become more normative. Importantly, the effect of violent victimization on first union timing is robust to controls for nonviolent delinquency, substance abuse, and violent perpetration. We conclude by discussing directions for future research on the association between violent victimization and coresidential unions with an eye toward the implications of such early union formation for desistance.

  3. Radiotracer studies in cavernous marble at Kamathikhairy Dam site, Pench Project (Maharashtra)

    International Nuclear Information System (INIS)

    Nath, Ravendra; Mahajan, N.M.; Vaidya, S.D.

    1982-01-01

    Radiotracer studies with tritiated water at Pench Project site conclusively proved that the cavernous marble upstream of the saddle dam is continuous with the marble occuring near the spillway portion of the main dam and that there is fast subterranean flow of water through the cavernous marble here. It is also established that this marble band upstream of the dam is interconnected with the marble band occuring in the vicinity of Pali village about 3 km downstream of the dam. Though big unclogged subterranean channels do not seem to exist in this region, which might have resulted in heavy leakage from the impounded reservoir, yet the possibility of some leakage of the water through the cavernous marble cannot be ruled out, due to the interconnection of the marble occuring upstream of the dam with the downstream marble band. (author)

  4. Characterisation of gold tailings dams of the Witwatersrand Basin ...

    African Journals Online (AJOL)

    2006-10-04

    Oct 4, 2006 ... bentonite layer between the 9th and 10th meter level to minimise vertical air flow from the bottom of the tailings dams. ... m depth with bentonite. Due to the age of the dams, and the fact that they ...... from Cyanide-Rich Gold Mine. Tailings. Unpublished M.Sc. Thesis, The University of New Bruns- wick, USA.

  5. Radioactive waste and contamination in the former Soviet Union

    International Nuclear Information System (INIS)

    Suokko, K.; Reicher, D.

    1993-01-01

    Decades of disregard for the hazards of radioactive waste have created contamination problems throughout the former Soviet Union rivaled only by the Chernobyl disaster. Although many civilian activities have contributed to radioactive waste problems, the nuclear weapons program has been by far the greatest culprit. For decades, three major weapons production facilities located east of the Ural Mountains operated in complete secrecy and outside of environmental controls. Referred to until recently only by their postal abbreviations, the cities of Chelyabinsk-65, Tomsk-7, and Krasnoyarsk-26 were open only to people who worked in them. The mismanagement of waste at these sites has led to catastrophic accidents and serious releases of radioactive materials. Lack of public disclosure, meanwhile, has often prevented proper medical treatment and caused delays in cleanup and containment. 5 refs

  6. Development of probabilistic operating rules for Hluhluwe Dam, South Africa

    Science.gov (United States)

    Ndiritu, J.; Odiyo, J.; Makungo, R.; Mwaka, B.; Mthethwa, N.; Ntuli, C.; Andanje, A.

    2017-08-01

    Hluhluwe Dam, with a 30 million m3 reservoir that supplies water for irrigation and Hluhluwe municipality in Kwa-Zulu Natal Province, South Africa, was consistently experiencing low storage levels over several non-drought years since 2001. The dam was operated by rules of thumb and there were no records of water releases for irrigation - the main user of the dam. This paper describes an assessment of the historic behaviour of the reservoir since its completion in 1964 and the development of operating rules that accounted for: i) the multiple and different levels of reliability at which municipal and irrigation demands need to be supplied, and ii) inter-annual and inter-decadal variability of climate and inflows into the dam. The assessment of the behaviour of the reservoir was done by simulation assuming trigonometric rule curves that were optimized to maximize both yield and storage state using the SCE-UA method. The resulting reservoir behaviour matched the observed historic trajectory reasonably well and indicated that the dam has mainly been operated at a demand of 10 million m3/year until 2000 when the demand suddenly rose to 25 million m3/year. Operating rules were developed from a statistical analysis of the base yields from 500 simulations of the reservoir each using 5 year-long stochastically generated sequences of inflows, rainfall and evaporation. After the implementation of the operating rules in 2009, the storage state of the dam improved and matched those of other reservoirs in the region that had established operating rules.

  7. Environmental risk index: A tool to assess the safety of dams for leachate

    International Nuclear Information System (INIS)

    Colomer Mendoza, Francisco J.; Gallardo Izquierdo, Antonio

    2009-01-01

    Dams for leachate store very toxic substances that contain a large amount of organic material and, probably, heavy metals; they therefore constitute an important threat to the environment. Existing models of environmental risk assessment for landfills do not take into consideration the specific risk that leachate dams may represent for the environment. In this paper a methodology to improve the environmental safety is presented according to the parameters used in their construction and management. In order to do that, the following characteristics of the dam must be known: (1) geotechnical stability, (2) erosion of downstream slope, (3) type of sealing of the dam, (4) overtopping probability, (5) volume of leachate stored inside the dam and (6) pollution load of leachate. Once these parameters have been calculated, they are transformed by means of rating curves into homogeneous units, so as to make it possible to operate between them. From the study and analysis of these parameters an environmental risk index for a dam for leachate can be calculated. If the environmental risk index exceeds an established value then it involves a dam for leachate with high environmental risk, therefore preventive measures in its design, construction and management would be necessary

  8. Numerical modeling and experimental validation of seismic uplift pressure variations in cracked concrete dams

    Energy Technology Data Exchange (ETDEWEB)

    Javanmardi, F.; Leger, P. [Ecole Polytechnique, Montreal, PQ (Canada). Dept. of Civil, Mining and Geological Engineering; Tinawi, R. [Quebec Univ., Montreal, PQ (Canada)

    2004-07-01

    Concrete dams could sustain cracking and damage during maximum design earthquakes (MDE). Dam safety guidelines are established so that dams maintain a stable condition following MDE oscillatory motions. In this study, a theoretical model was developed to calculate the uplift pressure variations along concrete cracks with moving walls. The proposed model was verified using experimental crack test data. The model was applied in a finite element computer program for dynamic analysis of gravity dams considering hydro-mechanical water-crack coupling. An analysis of a typical 90 metre dam subjected to low and high frequency sinusoidal accelerations demonstrated that water can penetrate into part of a seismically initiated crack. Pressure tends to develop in a region close to the crack mouth, therefore detrimental effects for the global dam stability are unlikely to occur. The study showed that the seismic uplift force during the heel crack opening mode is small compared to the dam weight. This preliminary study suggests that the critical sliding safety factors (SSF) of the dam against downstream sliding could be computed by considering zero uplift pressure in the crack region subjected to tensile opening. 14 refs., 1 tab., 7 figs.

  9. Statistical characteristics and stability index (si) of large-sized landslide dams around the world

    International Nuclear Information System (INIS)

    Iqbal, J.; Dai, F.; Raja, I.A.

    2014-01-01

    In the last few decades, landslide dams have received greater attention of researchers, as they have caused loss to property and human lives. Over 261 large-sized landslide dams from different countries of the world with volume greater than 1 x 105 m have been reviewed for this study. The data collected for this study shows that 58% of the catastrophic landslides were triggered by earthquakes and 21 % by rainfall, revealing that earthquake and rainfall are the two major triggers, accounting for 75% of large-sized landslide dams. These land-slides were most frequent during last two decades (1990-2010) throughout the world. The mean landslide dam volume of the studied cases was 53.39 x 10 m with mean dam height of 71.98 m, while the mean lake volume was found to be 156.62 x 10 m. Failure of these large landslide dams pose a severe threat to the property and people living downstream, hence immediate attention is required to deal with this problem. A stability index (SI) has been derived on the basis on 59 large-sized landslide dams (out of the 261 dams) with complete parametric information. (author)

  10. Lake Robertson hydroelectric project. Construction of a roller compacted concrete dam

    Energy Technology Data Exchange (ETDEWEB)

    Labelle, M.; Robitaille, F. [Hydro-Quebec, Montreal, PQ (Canada)

    1995-12-31

    Construction of the Lake Robertson hydroelectric project on Quebec`s Lower North Shore was discussed in detail. The dam and powerhouse, located on the HaHa River, consists of a 134 m long concrete gravity dam, and a 21 MW powerhouse with two 69 kV transmission lines and four substations. The climate, terrain, and geography of the region, all of them characterized as severe, and the logistics of construction of the dam and power lines, aggravated by the isolation and severe conditions at the site, were described. The roller compacted concrete design and construction were noted, and justification for a concrete dam over an earth-fill dam was provided. Economics, properties, and composition of the roller compacted concrete (RCC) were examined, and control test results for the RCC concrete were provided. The use of RCC for the Lake Robertson development was described as successful in terms of the quality, watertightness, and completion time. The experience gained by the participants will make it possible to offer RCC as an alternative on various other projects. 2 figs.

  11. 77 FR 22801 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2012-04-17

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group...). SUMMARY: The Glen Canyon Dam Adaptive Management Work Group (AMWG) makes recommendations to the Secretary..., the AMWG, a technical work group, a Grand Canyon Monitoring and Research Center, and independent...

  12. Primary Energy of the District city and Suburb

    Science.gov (United States)

    Pitonak, Anton; Lopusniak, Martin; Bagona, Miloslav

    2017-10-01

    In member states of the European Union, portion of buildings in the total consumption of energy represents 40 %, and their share in CO2 emissions represents 35 %. Taking into account the dependence of the European Union on import of energy, this represents a large quantity of energy and CO2 in spite of the fact that effective solutions for the reduction of energy demand of buildings exist. The European Union adopted three main commitments for fulfilment of criteria by year 2020 in the 20-20-20 Directive. Based on this Directive Slovakia declares support for renovating the building stock. The goal of the paper was to prove that renovation of the building stock is environmentally and energy preferably as construction of new buildings. In the paper, the settlement unit with the suburban one were compared. Both territories are dealt with in Kosice city, in Slovakia. The settlement units include apartment dwelling houses, amenities, parking areas and green. Suburban part contains family houses. The decisive factor for the final assessment of the buildings was global indicator. Global indicator of the energy performance is primary energy. The new building must meet minimum requirements for energy performance and it must be classified to energy class A1 since 2016, and to energy class A0 since 2020. The paper analyses the effects of the use of different resources of heat considering the global indicator. Primary energy was calculated and based on comparable unit. The primary energy was accounted for on the built-up area, area corresponding to district city and suburb, number of inhabitants. The study shows that the lowest values of global indicator are achieved by using wood. The highest values of global indicator are achieved by using electricity or district heating as an energy source. The difference between the highest and lowest value is 87 %. Primary energy based on inhabitant is 98 % lower in settlement unit compared to the suburban one.

  13. Unionism Comes to the Public Sector

    OpenAIRE

    Richard B. Freeman

    1984-01-01

    This paper argues that public sector labor relations is best understood in a framework that focuses on unions' ability to shift demand curves rather than to raise wages, as is the case in the private sector. It reviews the public sector labor relations literature and finds that: (i) public sector unionism has flourished as a result of changes in laws; (2) the effects of public sector unions on wages are likely to have been underestimated; (3) public sector unions have a somewhat different eff...

  14. Geochemical discrimination of five pleistocene Lava-Dam outburst-flood deposits, western Grand Canyon, Arizona

    Science.gov (United States)

    Fenton, C.R.; Poreda, R.J.; Nash, B.P.; Webb, R.H.; Cerling, T.E.

    2004-01-01

    Pleistocene basaltic lava dams and outburst-flood deposits in the western Grand Canyon, Arizona, have been correlated by means of cosmogenic 3He (3Hec) ages and concentrations of SiO2, Na2O, K2O, and rare earth elements. These data indicate that basalt clasts and vitroclasts in a given outburst-flood deposit came from a common source, a lava dam. With these data, it is possible to distinguish individual dam-flood events and improve our understanding of the interrelations of volcanism and river processes. At least five lava dams on the Colorado River failed catastrophically between 100 and 525 ka; subsequent outburst floods emplaced basalt-rich deposits preserved on benches as high as 200 m above the current river and up to 53 km downstream of dam sites. Chemical data also distinguishes individual lava flows that were collectively mapped in the past as large long-lasting dam complexes. These chemical data, in combination with age constraints, increase our ability to correlate lava dams and outburst-flood deposits and increase our understanding of the longevity of lava dams. Bases of correlated lava dams and flood deposits approximate the elevation of the ancestral river during each flood event. Water surface profiles are reconstructed and can be used in future hydraulic models to estimate the magnitude of these large-scale floods.

  15. Greece and the Missing Banking Union

    DEFF Research Database (Denmark)

    N. Gordon, Jeffery; Ringe, Georg

    2015-01-01

    The Greek Crisis is a crisis rather than a problem due to the vulnerability of Greek banks. While the banks have deep problems, this column argues that these would have been mitigated if a fully operational banking union were in place. A full banking union requires joint banking supervision, join...... bank resolution, and joint deposit insurance. The EZ only has the first so far. Completing the banking union must be part of any long-term solution.......The Greek Crisis is a crisis rather than a problem due to the vulnerability of Greek banks. While the banks have deep problems, this column argues that these would have been mitigated if a fully operational banking union were in place. A full banking union requires joint banking supervision, joint...

  16. UNION-K 2.0 User's Manual

    International Nuclear Information System (INIS)

    Yoo, Jae Woon; Jang, Jin Wook; Kim, Yeong Il

    2008-12-01

    The unified Input/Output processor UNION-K(UNified Input/Output Processor for Neutronics Analysis by K-CORE) has been developed to provide the automatic input file generation and output processing for the fast reactor core analysis. UNION-K includes the material database for reactor analysis and produces the input files for effective cross section generation, core analysis, and reactivity coefficient calculations. UNION-K can execute corresponding core analysis module and edit core performance parameters from the outputs. UNION-K also provides the graphical interface to check the geometrical arrangement of core and fuel sub-assembly and produces the picture files that can be used for reporting. This report has been prepared for instruction of using UNION-K Ver. 2.0 with examples

  17. Dams. Bulletin of the technical service of electric power and big dams; Barrages. Bulletin du service technique de l`energie electrique et des grands barrages (STEEGB)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Four papers were selected in this issue of `Barrages` bulletin. The first one concerns the surveillance of medium size dams, the second one deals with the life of French dams in operation (safety decennial and annual inspections). The third paper describes the behaviour of free flow spillways installed on loam dams while the last paper reports on the activities of the control service of the STEEGB for the second quarter of 1997 (decennial and annual inspections, important facts, administrative instructions, draining, floods, granting etc..). (J.S.)

  18. Dam spills and fishes; Eclusees et poissons

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This short paper reports the main topics discussed during the two days of the annual colloquium of the Hydro-ecology Committee of EdF. The first day was devoted to the presentation of the joint works carried out by EdF, the Paul-Sabatier University (Toulouse), the Provence St-Charles University (Marseille), the ENSAT (Toulouse) and the CEMAGREF (Lyon and Aix-en-Provence) about the environmental impact of dam spills on the aquatic flora and fauna downstream. A synthesis and recommendations were presented for the selection and characterization of future sites. The second day was devoted to the hydro-ecology study of the dam reservoir of Petit-Saut (French Guyana): water reoxygenation, quality evolution, organic matter, plankton, invertebrates and fishes. The 134 French dams concerned by water spills have been classified according to the frequency of spills, the variations of flow rates created, and their impacts on fishing, walking, irrigation, industry, drinking water, navigation, bathing. Particular studies on different sites have demonstrated the complexity of the phenomena involved concerning the impact on the ecosystems and the water quality. (J.S.).

  19. 2D Modeling of Flood Propagation due to the Failure of Way Ela Natural Dam

    Directory of Open Access Journals (Sweden)

    Yakti Bagus Pramono

    2018-01-01

    Full Text Available A dam break induced-flood propagation modeling is needed to reduce the losses of any potential dam failure. On the 25 July 2013, there was a dam break generated flood due to the failure of Way Ela Natural Dam that severely damaged houses and various public facilities. This study simulated the flooding induced by the failure of Way Ela Natural Dam. A two-dimensional (2D numerical model, HEC-RAS v.5, is used to simulate the overland flow. The dam failure itself is simulated using HECHMSv.4. The results of this study, the flood inundation, flood depth, and flood arrival time are verified by using available secondary data. These informations are very important to propose mitigation plans with respect to possible dam break in the future.

  20. Currency union entries and trade

    OpenAIRE

    Nitsch, Volker

    2005-01-01

    Recent research suggests that adopting a common currency increases bilateral trade. In this paper, I explore experiences of currency union entry in the post-war period and find no effect on trade. Previous results derived from a large panel data set (covering more than 200 countries from 1948 through 1997) appear to depend crucially on the assumption of symmetry between currency union exits and entries: While countries leaving a currency union experience significant declines in trade, currenc...

  1. IMPORTANCE OF THE EUROPEAN BANKING UNION NEW DIRECTIVES

    OpenAIRE

    MEDAR LUCIAN-ION; Irina-Elena Chirtoc

    2014-01-01

    European Banking Union has set new rules on monetary market especially for credit institutions and for financial banking groups in general. Economic and monetary union requires accomplishment of political and monetary union and democratic control of the European institutions on a single financial market. In this respect through its management organisms, EU has designed a series of unique mechanisms of financial union and called for a fiscal union. Union of European financial marke...

  2. Importance of using roller compacted concrete in techno-economic investigation and design of small dams

    Science.gov (United States)

    Rouissat, Bouchrit; Smail, N.; Zenagui, S.

    2017-12-01

    In recent years, and under constraints caused by persistent drought, Algeria has launched a new mobilization strategy for surface water resources from small and medium dams. However, by making a review of the studies and achievements of twenty small dams in the west of Algeria, some deficiencies appeared. In addition to reservoir siltation assessment, operation spillways have been the major constraint on the reliability of these types of dams. The objective of this paper is to use the roller compacted concrete (RCC) for small dams' design for the benefit it offers and its ability to incorporate spillways. The development of this reflection was applied to the Khneg Azir earth dam situated in southwest of Algeria. Its uncontrolled lateral spillway has registered significant damage following the flood of October 2005, amounted, at that time, to more than 100 million Algerian dinars (1 million US Dollars). The present research encompasses a technical and economical comparative analysis concerning multiple criteria dam design types coupled with the conjugation of the spillways. Thus, on the basis of financial estimates calculated for all design types, the variant RCC remains competitive with that of the earth dam's spillway isolated (Less than 40% of the cost). To assess the mechanical behavior of the foundations for both types of dams, (earth and RCC dams), numerical modeling has been undertaken, according to the comparative analysis of deformations in the foundations. Analysis of deformations showed that the average foundation deformations was between (0.052-0.85) m for earth dam and (0.023-0.373) m for RCC dam. These economical and technical considerations open up important prospects for the use of RCC in the design of small dams.

  3. Adolescent Violent Victimization and Precocious Union Formation*

    Science.gov (United States)

    C. Kuhl, Danielle; Warner, David F.; Wilczak, Andrew

    2013-01-01

    This article bridges scholarship in criminology and family sociology by extending arguments about “precocious exits” from adolescence to consider early union formation as a salient outcome of violent victimization for youths. Research indicates that early union formation is associated with several negative outcomes; yet the absence of attention to union formation as a consequence of violent victimization is noteworthy. We address this gap by drawing on life course theory and data from the National Longitudinal Study of Adolescent Health (Add Health) to examine the effect of violent victimization (“street” violence) on the timing of first co-residential union formation—differentiating between marriage and cohabitation—in young adulthood. Estimates from Cox proportional hazard models show that adolescent victims of street violence experience higher rates of first union formation, especially marriage, early in the transition to adulthood; however, this effect declines with age, as such unions become more normative. Importantly, the effect of violent victimization on first union timing is robust to controls for nonviolent delinquency, substance abuse, and violent perpetration. We conclude by discussing directions for future research on the association between violent victimization and coresidential unions with an eye toward the implications of such early union formation for desistance. PMID:24431471

  4. Seismic hazard and risk assessment for large Romanian dams situated in the Moldavian Platform

    Science.gov (United States)

    Moldovan, Iren-Adelina; Popescu, Emilia; Otilia Placinta, Anica; Petruta Constantin, Angela; Toma Danila, Dragos; Borleanu, Felix; Emilian Toader, Victorin; Moldoveanu, Traian

    2016-04-01

    Besides periodical technical inspections, the monitoring and the surveillance of dams' related structures and infrastructures, there are some more seismic specific requirements towards dams' safety. The most important one is the seismic risk assessment that can be accomplished by rating the dams into seismic risk classes using the theory of Bureau and Ballentine (2002), and Bureau (2003), taking into account the maximum expected peak ground motions at the dams site - values obtained using probabilistic hazard assessment approaches (Moldovan et al., 2008), the structures vulnerability and the downstream risk characteristics (human, economical, historic and cultural heritage, etc) in the areas that might be flooded in the case of a dam failure. Probabilistic seismic hazard (PSH), vulnerability and risk studies for dams situated in the Moldavian Platform, starting from Izvorul Muntelui Dam, down on Bistrita and following on Siret River and theirs affluent will be realized. The most vulnerable dams will be studied in detail and flooding maps will be drawn to find the most exposed downstream localities both for risk assessment studies and warnings. GIS maps that clearly indicate areas that are potentially flooded are enough for these studies, thus giving information on the number of inhabitants and goods that may be destroyed. Geospatial servers included topography is sufficient to achieve them, all other further studies are not necessary for downstream risk assessment. The results will consist of local and regional seismic information, dams specific characteristics and locations, seismic hazard maps and risk classes, for all dams sites (for more than 30 dams), inundation maps (for the most vulnerable dams from the region) and possible affected localities. The studies realized in this paper have as final goal to provide the local emergency services with warnings of a potential dam failure and ensuing flood as a result of an large earthquake occurrence, allowing further

  5. Vulnerability of Karangkates dams area by means of zero crossing analysis of data magnetic

    Energy Technology Data Exchange (ETDEWEB)

    Sunaryo,, E-mail: sunaryo@ub.ac.id, E-mail: sunaryo.geofis.ub@gmail.com; Susilo, Adi [Geophysics Program Study, Physics Dept., Sciences Faculty, University of Brawijaya, Malang (Indonesia)

    2015-04-24

    Study with entitled Vulnerability Karangkates Dam Area By Means of Zero Crossing Analysis of Data Magnetic has been done. The study was aimed to obtain information on the vulnerability of two parts area of Karangkates dams, i.e. Lahor dam which was inaugurated in 1977 and Sutami dam inaugurated in 1981. Three important things reasons for this study are: 1). The dam age was 36 years old for Lahor dam and 32 years old for Sutami dam, 2). Geologically, the location of the dams are closed together to the Pohgajih local shear fault, Selorejo local fault, and Selorejo limestone-andesite rocks contact plane, and 3). Karangkates dams is one of the important Hydro Power Plant PLTA with the generating power of about 400 million KWH per year from a total of about 29.373MW installed in Indonesia. Geographically, the magnetic data acquisition was conducted at coordinates (112.4149oE;-8.2028oS) to (112.4839oE;-8.0989oS) by using Proton Precession Magnetometer G-856. Magnetic Data acquisition was conducted in the radial direction from the dams with diameter of about 10 km and the distance between the measurements about 500m. The magnetic data acquisition obtained the distribution of total magnetic field value in the range of 45800 nT to 44450 nT. Residual anomalies obtained by doing some corrections, including diurnal correction, International Geomagnetic Reference Field (IGRF) correction, and reductions so carried out the distribution of the total magnetic field value in the range of -650 nT to 700 nT. Based on the residual anomalies, indicate the presence of 2 zones of closed closures dipole pairs at located in the west of the Sutami dam and the northwest of the Lahor dam from 5 total zones. Overlapping on the local geological map indicated the lineament of zero crossing patterns in the contour of residual anomaly contour with the Pohgajih shear fault where located at about 4 km to the west of the Sutami dam approximately and andesite-limestone rocks contact where located

  6. Large Dam Development: From Trojan Horse to Pandora’s Box

    NARCIS (Netherlands)

    Ahlers, R.; Zwarteveen, M.; Bakker, K.; Flyvbjerg, B.

    This chapter argues that there are important distinctions between large dam development in the twentieth century and the twenty-first century by conceptually framing dams not as mere objects in space but also as agents in dynamic and contested spatial strategies. This is illustrated by two examples:

  7. Costa Rica's Presentation to the 1st Workshop on Problems of Leakage in Dams

    International Nuclear Information System (INIS)

    Cordero Calderon, C.F.

    1994-03-01

    This paper includes information about the Instituto Costarricense de Electricidad (ICE); the project T racer Application to Leakage in Dams; the description of the Cachi's Dam and the description of the Arenal's Dam. (S. Grainger)

  8. Valorization of mud from Fergoug dam in manufacturing mortars

    Directory of Open Access Journals (Sweden)

    L. Laoufi

    2016-12-01

    Full Text Available The production of calcined mud, with pozzolanic properties, from the large quantities of sediments dredged from Algerian dams, could be a good opportunity for the formulation of high performance mortars and pozzolanic concretes, with lower costs and less greenhouse gas (CO2 emissions. The optimal temperatures selected for calcination were 750, 850 and 950 °C. The burning operation was continuous over a period of 3 h. Therefore, a series of physical, chemical, mechanical and microstructural analyses were conducted on sediment samples, collected from the waters of Fergoug dam. The results obtained from the analyses of the calcined mud, from the dam, allowed saying that mortars with different percentages of that mud represent a potential source of high reactivity pozzolanic materials.

  9. EnviroAtlas - National Inventory of Dams for the Conterminous United States

    Data.gov (United States)

    U.S. Environmental Protection Agency — This EnviroAtlas dataset is a summary of the National Dams Inventory data from 2009 survey. The file contains counts of inventoried dams by 12-digit hydrologic units...

  10. The two union catalogues of Myanmar

    Energy Technology Data Exchange (ETDEWEB)

    Hla, Win [Myanmar Scientific and Technological Research Dept., Yangon (Myanmar)

    1995-04-01

    The article mentions about the two union catalogues of Myanmar. The first one is the ``Consolidated Catalogue of journals and the periodicals contained in the libraries of Kasuali, Calcutta, Bombay, Madras, Coonoor, Rangoon and Shillong``. This was published by Indian Research Fund Association of Calcutta in 1933. This is the first union catalogue of medical periodicals for both Myanmar and India as well. The second one is ``the Regional Union Catalogue of Scientific Serials: Yangon``. This was published in 1977, its second printing in 1989. This union catalogue excludes medical serials. Twenty libraries took part in the compilation and publishing of the union catalogue with Technical Information Centre of Myanmar Scientific and Technological Research Department, (formerly Central Research Organization), No. 6, Kaba Aye Pagoda Road, Yankin P.O. Yangon, Myanmar, taking the leading role.

  11. The two union catalogues of Myanmar

    International Nuclear Information System (INIS)

    Hla, Win

    1995-01-01

    The article mentions about the two union catalogues of Myanmar. The first one is the ''Consolidated Catalogue of journals and the periodicals contained in the libraries of Kasuali, Calcutta, Bombay, Madras, Coonoor, Rangoon and Shillong''. This was published by Indian Research Fund Association of Calcutta in 1933. This is the first union catalogue of medical periodicals for both Myanmar and India as well. The second one is ''the Regional Union Catalogue of Scientific Serials: Yangon''. This was published in 1977, its second printing in 1989. This union catalogue excludes medical serials. Twenty libraries took part in the compilation and publishing of the union catalogue with Technical Information Centre of Myanmar Scientific and Technological Research Department, (formerly Central Research Organization), No. 6, Kaba Aye Pagoda Road, Yankin P.O. Yangon, Myanmar, taking the leading role

  12. 30 CFR 715.18 - Dams constructed of or impounding waste material.

    Science.gov (United States)

    2010-07-01

    ... overtopping by wind and wave action. (iii) Dams shall have minimum safety factors as follows: Case Loading... title and the name of the person operating or controlling the dam, shall be located on or immediately...

  13. The Performance of the Smart Cities in China—A Comparative Study by Means of Self-Organizing Maps and Social Networks Analysis

    Directory of Open Access Journals (Sweden)

    Dong Lu

    2015-06-01

    Full Text Available Smart cities link the city services, citizens, resource and infrastructures together and form the heart of the modern society. As a “smart” ecosystem, smart cities focus on sustainable growth, efficiency, productivity and environmentally friendly development. By comparing with the European Union, North America and other countries, smart cities in China are still in the preliminary stage. This study offers a comparative analysis of ten smart cities in China on the basis of an extensive database covering two time periods: 2005–2007 and 2008–2010. The unsupervised computational neural network self-organizing map (SOM analysis is adopted to map out the various cities based on their performance. The demonstration effect and mutual influences between these ten smart cities are also discussed by using social network analysis. Based on the smart city performance and cluster network, current problems for smart city development in China were pointed out. Future research directions for smart city research are discussed at the end this paper.

  14. Revisiting the homogenization of dammed rivers in the southeastern US

    Science.gov (United States)

    Ryan A. McManamay; Donald J. Orth; Charles A. Dolloff

    2012-01-01

    For some time, ecologists have attempted to make generalizations concerning how disturbances influence natural ecosystems, especially river systems. The existing literature suggests that dams homogenize the hydrologic variability of rivers. However, this might insinuate that dams affect river systems similarly despite a large gradient in natural hydrologic character....

  15. 75 FR 34476 - Glen Canyon Dam Adaptive Management Work Group

    Science.gov (United States)

    2010-06-17

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group... Management Work Group. The purpose of the Adaptive Management Work Group is to advise and to provide... of the Glen Canyon Dam Adaptive Management Work Group is in the public interest in connection with...

  16. Evaluation of the Pseudostatic Analyses of Earth Dams Using FE Simulation and Observed Earthquake-Induced Deformations: Case Studies of Upper San Fernando and Kitayama Dams

    Directory of Open Access Journals (Sweden)

    Tohid Akhlaghi

    2014-01-01

    Full Text Available Evaluation of the accuracy of the pseudostatic approach is governed by the accuracy with which the simple pseudostatic inertial forces represent the complex dynamic inertial forces that actually exist in an earthquake. In this study, the Upper San Fernando and Kitayama earth dams, which have been designed using the pseudostatic approach and damaged during the 1971 San Fernando and 1995 Kobe earthquakes, were investigated and analyzed. The finite element models of the dams were prepared based on the detailed available data and results of in situ and laboratory material tests. Dynamic analyses were conducted to simulate the earthquake-induced deformations of the dams using the computer program Plaxis code. Then the pseudostatic seismic coefficient used in the design and analyses of the dams were compared with the seismic coefficients obtained from dynamic analyses of the simulated model as well as the other available proposed pseudostatic correlations. Based on the comparisons made, the accuracy and reliability of the pseudostatic seismic coefficients are evaluated and discussed.

  17. Introduction of an Emergency Response Plan for flood loading of Sultan Abu Bakar Dam in Malaysia

    Science.gov (United States)

    Said, N. F. Md; Sidek, L. M.; Basri, H.; Muda, R. S.; Razad, A. Z. Abdul

    2016-03-01

    Sultan Abu Bakar Dam Emergency Response Plan (ERP) is designed to assist employees for identifying, monitoring, responding and mitigation dam safety emergencies. This paper is outlined to identification of an organization chart, responsibility for emergency management team and triggering level in Sultan Abu Bakar Dam ERP. ERP is a plan that guides responsibilities for proper operation of Sultan Abu Bakar Dam in respond to emergency incidents affecting the dam. Based on this study four major responsibilities are needed for Abu Bakar Dam owing to protect any probable risk for downstream which they can be Incident Commander, Deputy Incident Commander, On-Scene Commander, Civil Engineer. In conclusion, having organization charts based on ERP studies can be helpful for decreasing the probable risks in any projects such as Abu Bakar Dam and it is a way to identify and suspected and actual dam safety emergencies.

  18. Seismic resistant design of a nuclear category I earth dam

    International Nuclear Information System (INIS)

    Vaidya, N.R.; Ries, E.R.; Kissenpfennig, J.F.

    1975-01-01

    An integral part of many nuclear power plants is the ultimate heat sink (UHS); the purpose of which is to retain and deliver a supply of service water to the plant when water from the primary circulating water system is not available. The earth dam described herein is designed to retain the reservoir for the UHS of a nuclear power plant in Southern Europe. The usual pseudo-static analysis is only as good as the estimate for the seismic coefficient used to compute an equivalent horizontal static force on a potential sliding mass. In view of the earth dam considered herein, a more accurate computation of the seismic coefficients is to be made. A two-dimensional dynamic finite element analysis is made to predict the response of the earth dam to a Safe Shutdown Earthquake excitation which is in the form of a time history of accelerations appropriately deconvoluted from the surficial time history and applied at the base of the model. The material properties such as shear modulus and damping are adjusted to be compatible with the level of strain obtained. Thus, non-linear behavior of soil is considered in the analysis and a more realistic response is predicted. Acceleration and stress are determined throughout the dam and are used to compute a seismic coefficient for a pseudo-static stability analysis and the dynamic strength to stress ratios at several points in the body of the dam. The need to design the dam to resist a progressive erosion accident resulting from postulated concentrated leaks is discussed. This may be accomplished by providing a wide, well graded core protected by wide transition cores also heavily compacted

  19. Developing a Water Quality Index (WQI) for an Irrigation Dam.

    Science.gov (United States)

    De La Mora-Orozco, Celia; Flores-Lopez, Hugo; Rubio-Arias, Hector; Chavez-Duran, Alvaro; Ochoa-Rivero, Jesus

    2017-04-29

    Pollution levels have been increasing in water ecosystems worldwide. A water quality index (WQI) is an available tool to approximate the quality of water and facilitate the work of decision-makers by grouping and analyzing numerous parameters with a single numerical classification system. The objective of this study was to develop a WQI for a dam used for irrigation of about 5000 ha of agricultural land. The dam, La Vega, is located in Teuchitlan, Jalisco, Mexico. Seven sites were selected for water sampling and samples were collected in March, June, July, September, and December 2014 in an initial effort to develop a WQI for the dam. The WQI methodology, which was recommended by the Mexican National Water Commission (CNA), was used. The parameters employed to calculate the WQI were pH, electrical conductivity (EC), dissolved oxygen (DO), total dissolved solids (TDS), total hardness (TH), alkalinity (Alk), total phosphorous (TP), Cl - , NO₃, SO₄, Ca, Mg, K, B, As, Cu, and Zn. No significant differences in WQI values were found among the seven sampling sites along the dam. However, seasonal differences in WQI were noted. In March and June, water quality was categorized as poor. By July and September, water quality was classified as medium to good. Quality then decreased, and by December water quality was classified as medium to poor. In conclusion, water treatment must be applied before waters from La Vega dam reservoir can be used for irrigation or other purposes. It is recommended that the water quality at La Vega dam is continually monitored for several years in order to confirm the findings of this short-term study.

  20. Detecting fluid leakage of a reservoir dam based on streaming self-potential measurements

    Science.gov (United States)

    Song, Seo Young; Kim, Bitnarae; Nam, Myung Jin; Lim, Sung Keun

    2015-04-01

    Between many reservoir dams for agriculture in suburban area of South Korea, water leakage has been reported several times. The dam under consideration in this study, which is located in Gyeong-buk, in the south-east of the Korean Peninsula, was reported to have a large leakage at the right foot of downstream side of the reservoir dam. For the detection of the leakage, not only geological survey but also geophysical explorations have been made for precision safety diagnosis, since the leakage can lead to dam failure. Geophysical exploration includes both electrical-resistivity and self-potential surveys, while geological surveys water permeability test, standard penetration test, and sampling for undisturbed sample during the course of the drilling investigation. The geophysical explorations were made not only along the top of dam but also transverse the heel of dam. The leakage of water installations can change the known-heterogeneous structure of the dam body but also cause streaming spontaneous (self) potential (SP) anomaly, which can be detected by electrical resistivity and SP measurements, respectively. For the interpretation of streaming SP, we used trial-and-error method by comparing synthetic SP data with field SP data for model update. For the computation, we first invert the resistivity data to obtain the distorted resistivity structure of the dam levee then make three-dimensional electrical-resistivity modeling for the streaming potential distribution of the dam levee. Our simulation algorithm of streaming SP distribution based on the integrated finite difference scheme computes two-dimensional (2D) SP distribution based on the distribution of calculated flow velocities of fluid for a given permeability structure together with physical properties. This permeability is repeatedly updated based on error between synthetic and field SP data, until the synthetic data match the field data. Through this trial-and-error-based SP interpretation, we locate the

  1. Behaviour of mink kits and dams (Mustela vison) in the lactation period

    DEFF Research Database (Denmark)

    Brink, Anne-Line; Jeppesen, Leif Lau

    2005-01-01

    This study describes the development of the behaviour of mink kits and dams from the fourth to the eighth respectively seventh week after delivery. The study is based on scan observations of 72 mink dams and their kits at a conventional Danish mink farm. The kits started eating when they were about...... 30 d old. Drinking started almost 2 wk later. During these 2 wk there was a peak in the licking of saliva from the dam and of the inter-litter agonistic behaviour. A causal relationship between experienced thirst and agonistic behaviour is suggested. The kits' sucking declined to only 5% of the time...... budget in the seventh week and the stereotypy frequency of the dams increased to about 4% of the time budget. It is suggested that some dams are frustrated by the forced cohabitation with their nutritionally independent kits already in the seventh week and that this should be taken into account when...

  2. Numerical modelling of channel processes and analysis of possible channel improvement measures on the Lena River near city Yakutsk

    Science.gov (United States)

    Krylenko, Inna; Belikov, Vitaly; Zavadskii, Aleksander; Borisova, Natalya; Golovlyov, Pavel; Rumyantsev, Alexey

    2017-04-01

    City Yakutsk (administrative, culture and industrial center of the North East of Russia) situated on the left bank of large Russian river Lena last decades has faced with many problems, concerning intensive channel processes. Most dramatic among them are sediment accumulation near main water intake structure, supplying city Yakutsk by the drinking water, and deterioration in conditions of the navigation roots to the main city ports. Hydrodynamic modelling has been chosen as the main tool for analyses of the modern tendencies in channel processes and for the evaluation of possible channel improvement measures efficiency. STREAM_2D program complex (authors V. Belikov et al.), which is based on the numerical solution of two-dimensional Saint-Venant equations on a hybrid curvilinear quadrangular and rectangular mesh and take into account sediment transport, was used for the simulations. Detailed field data about water regime of the Lena river, bathymetry of the channels and topography of the floodplains was collected for model developing. Model area has covered 75 km of the Lena river valley including branched channels and wide floodplain from Tabaga to Kangalassy gauge cites. Data of these stations were used for model boundary conditions assigning. Data of gauge station city Yakutsk as well as measured during field campaign water levels and flow velocities was taken into account for model calibration and validation. Results of modelling has demonstrated close correspondence with observed water levels and discharges distribution between channel branches for different hydrological situations. Different combinations of hydrographs of 1, 10, 50% exceedance probability was used as input for modelling of channel deformations. Simulation results has shown that in future 10 years aligning of water discharges distribution between main Lena river branches near Yakutsk is possible, that is a positive tendency from the point of view of water supply of the city. More than 15

  3. Anadromous sea lampreys recolonize a Maine coastal river tributary after dam removal

    Science.gov (United States)

    Hogg, Robert; Coghlan, Stephen M.; Zydlewski, Joseph D.

    2013-01-01

    Sedgeunkedunk Stream, a third-order tributary to the Penobscot River, Maine, historically supported several anadromous fishes, including the Atlantic Salmon Salmo salar, AlewifeAlosa pseudoharengus, and Sea Lamprey Petromyzon marinus. However, two small dams constructed in the 1800s reduced or eliminated spawning runs entirely. In 2009, efforts to restore marine–freshwater connectivity in the system culminated with removal of the lowermost dam, thus providing access to an additional 4.6 km of lotic habitat. Because Sea Lampreys utilized accessible habitat prior to dam removal, they were chosen as a focal species with which to quantify recolonization. During spawning runs of 2008–2011 (before and after dam removal), individuals were marked with PIT tags and their activity was tracked with daily recapture surveys. Open-population mark–recapture models indicated a fourfold increase in the annual abundance of spawning-phase Sea Lampreys, with estimates rising from 59±4 () before dam removal (2008) to 223±18 and 242±16 after dam removal (2010 and 2011, respectively). Accompanying the marked increase in annual abundance was a greater than fourfold increase in nesting sites: the number of nests increased from 31 in 2008 to 128 and 131 in 2010 and 2011, respectively. During the initial recolonization event (i.e., in 2010), Sea Lampreys took 6 d to move past the former dam site and 9 d to expand into the furthest upstream reaches. Conversely, during the 2011 spawning run, Sea Lampreys took only 3 d to penetrate into the upstream reaches, thus suggesting a potential positive feedback in which larval recruitment into the system may have attracted adult spawners via conspecific pheromone cues. Although more research is needed to verify the migratory pheromone hypothesis, our study clearly demonstrates that small-stream dam removal in coastal river systems has the potential to enhance recovery of declining anadromous fish populations.

  4. Phytoplankton composition of Sazlidere Dam lake, Istanbul, Turkey

    Directory of Open Access Journals (Sweden)

    Nese Yilmaz

    2013-05-01

    Full Text Available The phytoplankton composition of Sazlidere Dam lake was studied at 5 sampling sites between December 2003 - November 2005. A total of 67 taxa were recorded, representing Bacillariophyta (31, Chlorophyta (18, Cyanophyta (9, Chrysophyta (1, Cryptophyta (1, Dinophyta (3 and Euglenophyta (4. Bacillariophyta members constituted the dominant phytoplankton group in terms of species number. Nygaard’s compound index value and composition of phytoplankton indicate that the trophic state of Sazlidere Dam lake was changing from oligotrophic to mesotrophic.

  5. Olympic dam expansion - a clear future for uranium

    International Nuclear Information System (INIS)

    Hunt, G.

    2008-01-01

    After BHP Billiton's acquisition of Olympic Dam in northern South Australia in 2005, an important early decision was to undertake a major drilling campaign to better define the resource. Between 2005 and 2007, the drilling almost doubled the resource. BHP Billiton's 2007 annual report indicated the Olympic Dam mineral resource estimate is 7.855 B dry metric tonnes at metal grades of 0.86% Copper, 0.29 kg per tonne Uranium Oxide, 0.3 g/t Gold and 1.6 g/t Silver.

  6. Management plan for White Oak Dam. Revision 1

    International Nuclear Information System (INIS)

    Ahmed, S.B.

    1997-03-01

    The purpose is to provide operation and maintenance, periodic inspection, and emergency action plans for White Oak Dam in general accordance with the Federal Emergency Management Agency (FEMA) guidelines for dam safety. It must be understood that operations at the site are primarily for purposes of environmental monitoring, environmental protection and waste management operations control. Effluent is generally allowed to flow from the lake at its natural rate by rising above the broad crested weir notch elevation of 744 feet m.s.l

  7. Brazilian union actions for workers' health protection

    Directory of Open Access Journals (Sweden)

    Rodolpho Repullo Junior

    Full Text Available CONTEXT: Many authors have emphasized the importance of worker strength through unionized organizations, in relation to the improvement of working procedures, and have reported on the decisiveness of labor movement actions in achieving modifications within the field of work and health. OBJECTIVE: To describe the ways in which Brazilian unions have tried to intervene in health-illness and work processes, identifying the existence of commonality in union actions in this field. TYPE OF STUDY: Qualitative study. SETTING: Postgraduate Program, Environmental Health Department, Faculdade de Saúde Pública, Universidade de São Paulo, São Paulo, Brazil. METHODS: Union health advisers and directors were interviewed. Documents relating to union action towards protecting workers' health were collected and analyzed. RESULTS: Unions articulate actions regarding workers' health of a technical and political nature that involve many aspects and high complexity. These have been divided into thematic categories for better analysis. DISCUSSION: Union actions regarding workers' health in Brazil are restricted to some unions, located mainly in the southern, southeastern and northeastern regions of the country. Nonetheless, the unions undertaking such actions represent many professions of great economic and political importance. CONCLUSIONS: The recent changes in health and safety at work regulations, recognition of professional diseases, creation of workers' health services and programs within the unified health system, and operational improvements in companies' specialized safety and occupational medicine services, all basically result from union action. There is commonality of union action in this field in its seeking of technical and political strengthening for all workers and their general and local representation. This has the objective of benefiting collective bargaining between employers and workers. Inter-institutional action on behalf of workers' rights

  8. The State of the Union

    DEFF Research Database (Denmark)

    This special issue of Angles marks the three hundredth anniversary of the Union of the two kingdoms of Scotland and England. The nature and development of the relations between the constituent parts of the United Kingdom is a fascinating topic also to outside observers, and some of the contributi...... of the contributions to this volume deal with the Union in a comparative European context. Both Scottish nationalism and Scottish unionism are analysed, and Anglo-Scottish relations are looked at from historical, sociological, linguistic and literary angles...

  9. Why dentists don't use rubber dam during endodontics and how to promote its usage?

    Science.gov (United States)

    Madarati, Ahmad A

    2016-02-25

    This survey study aimed at investigating the frequency of rubber dam use during root canal treatment, identifying influencing factors for not using it by Saudi general dental practitioners (GDPs) and endodontists. It also aimed at identifying measures that increase rubber dam usage. After obtaining an ethical approval, two pilot studies were conducted on staff members at Taibah University College of Dentistry and a group of GDPs. A final online survey was constructed comprising 17 close-ended questions divided into six categories: demographics, endodontic practice, rubber dam use, alternative isolation methods, reasons for not using rubber dam, and measures and policies that increase its usage. The survey was emailed to 375 GDPs randomly selected from the dental register and all endodontists (n = 53) working in the western province, Saudi Arabia. Data were analyzed using the Chi-square and Linear-by-Linear association tests at p ≤ 0.05. The proportion of endodontists who used rubber dam (84.8 %) was significantly greater than that of GDPs (21.6 %) (p < 0.001). Significantly the highest proportion (40.5 %) did not use rubber dam because of unavailability at working place. Most rubber dam none-users (69.25 %) used a combination of other isolation means. The highest proportion of those who used rubber dam were working in the governmental sector (54.3 %). Among rubber dam users, the greatest proportion graduated from Saudi Arabia (57.8 %) compared to those graduated from Egypt (34.3 %) and Syria (22.4 %). There was a significant correlation between the patterns of rubber dam use during undergraduate training and its usage after graduation (p = 0.001). The highest proportion of participants (48.1 %) reported better undergraduate education as the most important factor that would increase rubber dam use in dental practice. Using of rubber dam was not common in Saudi general dental practice. Dentists must follow the recommended standards of care. Place of work and

  10. Measures of struggle against appearance of cracks in earth dams

    Directory of Open Access Journals (Sweden)

    Ibraeva Yulia

    2016-01-01

    Full Text Available The article describes a method calculation of the basic parameters of the transverse rows of pile of simple printed or precast dam. As well, in this article have been shown all the necessary formulas for this calculation and have been proposed solutions to prevent cracking in the dams.

  11. Seen one dam, seen 'em all?: the surprising story of the Deschutes River.

    Science.gov (United States)

    Sally. Duncan

    2000-01-01

    In the next few decades, hundreds of private dams will be relicensed by the Federal Energy Regulatory Commission. Many of them are on or influence Forest Service lands. Relicensing requires rigorous technical assessments of the effects of dams on critical resources, including channels, aquatic habitat, water quality, and recreation. Dams differ widely in their...

  12. Reconstructing Sediment Supply, Transport and Deposition Behind the Elwha River Dams

    Science.gov (United States)

    Beveridge, C.

    2017-12-01

    The Elwha River watershed in Olympic National Park of Washington State, USA is predominantly a steep, mountainous landscape where dominant geomorphic processes include landslides, debris flows and gullying. The river is characterized by substantial variability of channel morphology and fluvial processes, and alternates between narrow bedrock canyons and wider alluvial reaches for much of its length. Literature suggests that the Elwha watershed is topographically and tectonically in steady state. The removal of the two massive hydropower dams along the river in 2013 marked the largest dam removal in history. Over the century long lifespan of the dams, approximately 21 million cubic meters of sediment was impounded behind them. Long term erosion rates documented in this region and reservoir sedimentation data give unprecedented opportunities to test watershed sediment yield models and examine dominant processes that control sediment yield over human time scales. In this study, we aim to reconstruct sediment supply, transport and deposition behind the Glines Canyon Dam (most upstream dam) over its lifespan using a watershed modeling approach. We developed alternative models of varying complexity for sediment production and transport at the network scale driven by hydrologic forcing. We simulate sediment supply and transport in tributaries upstream of the dam. The modeled sediment supply and transport dynamics are based on calibrated formulae (e.g., bedload transport is simulated using Wilcock-Crowe 2003 with modification based on observed bedload transport in the Elwha River). Observational data that aid in our approach include DEM, channel morphology, meteorology, and streamflow and sediment (bedload and suspended load) discharge. We aim to demonstrate how the observed sediment yield behind the dams was influenced by upstream transport supply and capacity limitations, thereby demonstrating the scale effects of flow and sediment transport processes in the Elwha River

  13. Design, construction and performance of the Oldman River Dam grout curtain

    Energy Technology Data Exchange (ETDEWEB)

    Hartmaier, H.; Davachi, M. [Acres International Ltd., Calgary, AB (Canada); Dharmawardene, W. [Alberta Environment, Edmonton, AB (Canada); Sinclair, B. [Acres International Ltd., Niagara Falls, ON (Canada)

    2002-07-01

    The 76 m high Oldman River Dam was constructed between 1986 and 1991 near Pincher Creek, Alberta to provide flow regulation and on-stream storage of water for multi-purpose use and irrigation services as well as hydroelectric development. The dam's main structure includes an earth- and rockfill dam, a low earthfill dyke 1500 m long, twin diversion/low level outlet tunnels, a gated spillways structure, and 2 drainage tunnels. A 1.3 km long, three-line grout curtain up to 100 m deep extends below the foundation of the dam and spillway. The grout curtain was built in undeformed Paleocene sedimentary rocks affected by stress relief due to river valley erosion. 80 per cent of the grout consumption was from bedrock structural features. Piezometers, slope indicators and flow measurement weirs were installed in the dam and abutment areas both during and after construction to monitor the performance of the grout curtain. Instrument readings indicate that the grout curtain is successfully preventing the transmission of reservoir pressures to the foundation beneath the downstream shell of the dam. The piezometric pressures downstream of the grout curtain are the same as they were in the foundation before impounding. A small amount of seepage has appeared at the end of the grout curtain at the eastern end of the abutment of the spillway but it is not considered to be significant. 3 refs., 4 figs.

  14. Dams and Displacement: Raising the Standards and Broadening the Research Agenda

    Directory of Open Access Journals (Sweden)

    Brooke McDonald-Wilmsen

    2010-06-01

    Full Text Available The World Commission on Dams provided an analytical overview of the cumulative effects of years of dam development. A lack of commitment or capacity to cope with displacement or to consider the civil rights of, or risks to, displaced people led to the impoverishment and suffering of tens of millions and growing opposition to dams by affected communities worldwide. However, after the WCD, little has changed for the better in terms of resettlement policies. In fact, the standards of key agencies, like the Asian Development Bank, have been lowered and diluted compared to prior policies. Dam-induced development and displacement are stifled by a 'managerialist' approach to planning, in which solutions are sought internally and subordinated to the economics that underpins the existence of the project. The aim of successful resettlement is to prevent impoverishment and to enable displaced people to share in the project’s benefits. Within the field of dam-induced resettlement, this is a lofty goal rarely achieved. However, in other fields of resettlement, such as refugee studies and adaptation to environmental change, such a goal is regarded as a minimum standard. In this paper we seek to broaden the research agenda on dam-induced resettlement and to raise the standards of development projects that entail resettlement. We do this by importing some of the considerations and concerns from practice and research from the fields of refugee studies and adaptation to environmental change.

  15. Assessing changes in failure probability of dams in a changing climate

    Science.gov (United States)

    Mallakpour, I.; AghaKouchak, A.; Moftakhari, H.; Ragno, E.

    2017-12-01

    Dams are crucial infrastructures and provide resilience against hydrometeorological extremes (e.g., droughts and floods). In 2017, California experienced series of flooding events terminating a 5-year drought, and leading to incidents such as structural failure of Oroville Dam's spillway. Because of large socioeconomic repercussions of such incidents, it is of paramount importance to evaluate dam failure risks associated with projected shifts in the streamflow regime. This becomes even more important as the current procedures for design of hydraulic structures (e.g., dams, bridges, spillways) are based on the so-called stationary assumption. Yet, changes in climate are anticipated to result in changes in statistics of river flow (e.g., more extreme floods) and possibly increasing the failure probability of already aging dams. Here, we examine changes in discharge under two representative concentration pathways (RCPs): RCP4.5 and RCP8.5. In this study, we used routed daily streamflow data from ten global climate models (GCMs) in order to investigate possible climate-induced changes in streamflow in northern California. Our results show that while the average flow does not show a significant change, extreme floods are projected to increase in the future. Using the extreme value theory, we estimate changes in the return periods of 50-year and 100-year floods in the current and future climates. Finally, we use the historical and future return periods to quantify changes in failure probability of dams in a warming climate.

  16. Crosshole seismic measurements to characterise and monitor the internal condition of embankment dams

    Energy Technology Data Exchange (ETDEWEB)

    Vazinkhoo, S. [Horizon Engineering Inc., North Vancouver, BC (Canada); Gaffran, P. [BC Hydro, Burnaby, BC (Canada)

    2002-12-01

    A sinkhole was discovered at the Bennett Dam in June 1996. The discovery was immediately followed by an investigation consisting 14 geophysical techniques, of which crosshole seismic testing was the most successful. The Bennett Dam Sinkhole Investigation Project resulted in remedial action which involved compaction grouting to repair the defects. Crosshole seismic testing has been carried out annually since 1996 to verify that the integrity of the repaired zone is being maintained. Large amounts of data have been collected since initial testing to augment other acquired data from more conventional geotechnical techniques. Both data sets have provided a unique opportunity to correlate seismic velocities to mechanical soil properties. The condition of the dam can now be readily assessed through the prediction of seismic velocities for a range of soil properties at any point in the dam. The study has resulted in a better understanding of measured velocities with respect to dam behaviour. Results confirm that seismic velocity testing is a useful, non-intrusive tool for monitoring the performance of embankment dams. 13 refs., 2 tabs., 8 figs.

  17. Small farm dams: impact on river flows and sustainability in a context of climate change

    Science.gov (United States)

    Habets, F.; Philippe, E.; Martin, E.; David, C. H.; Leseur, F.

    2014-10-01

    The repetition of droughts in France has led to a growing demand for irrigation water and consequently to an increase in requests for the construction of small farm dams. Although such dams are small, their accumulation in a basin affects river flows, because the water collected in these small farm dams is used for irrigation and thus does not contribute to river flow. In order to gain more insight into their impact on the annual and monthly discharges, especially during dry years, a small farm dam model was built and connected to a hydrometeorological model. Several scenarios with different volume capacities, filling catchment sizes and filling periods were tested for such dams. The results were analysed in a small basin in western France, where the pressure for building such dams is high, and then extended to the entire country. It was found that, due to the hydrometeorological conditions (mainly low precipitation compared to other regions in France), the development of small farm dams in north-western France would result in greater decreases in river flows and less efficient filling of small farm dams than in other regions. Therefore, such dams might not be as efficient as expected in supplying water to farmers when needed. Moreover, the ability to fill small farm dams is projected to decrease in a context of climate change, despite the uncertainty on the evolution of precipitation, thus worsening the situation.

  18. Increasing drought risk in large-dam basins of South Korea

    Science.gov (United States)

    Jung, I. W.; Shin, Y.; Park, J.; Kim, D.

    2017-12-01

    In 2015, South Korea suffered one of the worst droughts in recent years. Seoul and Gyeonggi and Gangwon provinces experienced severe drought conditions, receiving less than 43 percent of the annual precipitation average of the past 30 years. Additionally, the 2015 summer precipitation was less than half of the average. The lack of summer precipitation induced serious shortages in dam storages, which are important supplies for the dry season. K-water, a public company managing South Korea's public water supply system, is fighting to secure public water supply and minimize potential damage that may occur before the subsequent wet season. This study detected significant decreasing trends (95% confidence interval) in dry-seasonal runoff rates (=dam inflow / precipitation) in three dams basins (Soyang, Chungju, and Andong). Changes in potential evapotranspiration (PET) and precipitation indices were examined to investigate potential causes of decreasing runoff rates trends. However, there were no clear relations among changes in runoff rates, PET, and precipitation indices. Runoff rate reduction in the three dams may increase the risk of dam operational management and long-term water resource planning. Therefore, it will be necessary to perform a multilateral analysis to better understand decreasing runoff rates.AcknowledgementsThis research was supported by a grant(2017-MPSS31-001) from Supporting Technology Development Program for Disaster Management funded by Ministry of Public Safety and Security(MPSS) of the Korean government.

  19. On the hydrologic-hydraulic revaluation of large dams

    Energy Technology Data Exchange (ETDEWEB)

    Sebastianelli, S.; Giglioni, M.; Mineo, C.; Magnaldi, S. [Sapienza Università di Roma, Dipartimento di Ingegneria Civile, Edile e Ambientale (Italy)

    2016-06-08

    The aim of the present work is to develop a criteria to evaluate the safety level of large dams. This is executed by comparing the discharge capability of a dam with the peak flow estimates, with respect to 100-, 200-, 500-, and 1000- year return periods. The methodology consists of estimating the intensity duration frequency (IDF) curves, starting from observational time series, collected by rain gauges. Then, through a rainfall-runoff transformation, the design hydrographs are obtained for different return periods. The results are compared to trends of peak discharges, obtained previously by the handler of the dam. It can be noted that, if the basin area is smaller than 1 km{sup 2}, the peak discharges estimated are always lower than those calculated by the handler, regardless of the antecedent moisture conditions (AMC) assumed. Otherwise, the peak discharges obtained by the handler range between those we obtained for AMCII and AMCIII.

  20. On the hydrologic-hydraulic revaluation of large dams

    International Nuclear Information System (INIS)

    Sebastianelli, S.; Giglioni, M.; Mineo, C.; Magnaldi, S.

    2016-01-01

    The aim of the present work is to develop a criteria to evaluate the safety level of large dams. This is executed by comparing the discharge capability of a dam with the peak flow estimates, with respect to 100-, 200-, 500-, and 1000- year return periods. The methodology consists of estimating the intensity duration frequency (IDF) curves, starting from observational time series, collected by rain gauges. Then, through a rainfall-runoff transformation, the design hydrographs are obtained for different return periods. The results are compared to trends of peak discharges, obtained previously by the handler of the dam. It can be noted that, if the basin area is smaller than 1 km"2, the peak discharges estimated are always lower than those calculated by the handler, regardless of the antecedent moisture conditions (AMC) assumed. Otherwise, the peak discharges obtained by the handler range between those we obtained for AMCII and AMCIII.