WorldWideScience

Sample records for underground construction technology

  1. Construction and maintenance of underground mine roads

    Energy Technology Data Exchange (ETDEWEB)

    Logan, A.S.; Seedsman, R.W. [Coffey Partners International Pty. Ltd. (Australia)

    1995-12-31

    Good roads are essential in moving men and materials to and from the underground workplace. An underground coal industry funded project was recently completed on underground mine road construction and maintenance. This paper discusses practical approaches to construction and maintenance of underground mine roads using transferable civil technologies and innovative techniques. Mine pavements are generally low-cost (relative to civil roads), constructed to varying standards using locally available materials to best meet the mobility needs of the mine. Performance of pavements is thus largely dependent on the environmental conditions, quality of the available road making materials, maintenance policies and available resources. This paper explains the causes of bad roads in various underground environments. It details available management strategies, construction and water control techniques, road maintenance and vehicle considerations. It concludes that the trend to larger rubber tires mining equipment needs to be matched with construction and maintenance of high quality road surfaces. For large operations, the total cost due to poor roads may equate to in excess of $A1 million per annum. The strategies outlined in this paper provide the basis for construction and maintenance of underground mine roads to help achieve desired production targets. (author). 2 tabs., 4 figs., 7 refs.

  2. A Careful Blasting Technique During Construction of underground Openings for Nuclear Waste Repository

    International Nuclear Information System (INIS)

    Ester, Z.; Vrkljan, D.

    1998-01-01

    Underground nuclear waste repositories are constructed in natural rock formations, with heterogenous compound and structure, and should be accommodated in design and construction according to rock conditions. The quality insurance of underground repository, during and after construction, is most demanding in view of contour and category of excavation. the technology of drilling and blasting, regarding the mechanical excavation, is accommodated in sense of response to cross section magnitude of underground openings, the rock conditions and category, the support performance and other design demands. The high level rock damage around underground openings, that is in opposition with reaching quality insurance. Conventional construction technology can be successful by implementation of controlled blasting technique avoiding extensive rock weakness. (author)

  3. Advances in technology for the construction of deep-underground facilities

    Energy Technology Data Exchange (ETDEWEB)

    1987-12-31

    The workshop was organized in order to address technological issues important to decisions regarding the feasibility of strategic options. The objectives of the workshop were to establish the current technological capabilities for deep-underground construction, to project those capabilities through the compressed schedule proposed for construction, and to identify promising directions for timely allocation of existing research and development resources. The earth has been used as a means of protection and safekeeping for many centuries. Recently, the thickness of the earth cover required for this purpose has been extended to the 2,000- to 3,000-ft range in structures contemplated for nuclear-waste disposal, energy storage, and strategic systems. For defensive missile basing, it is now perceived that the magnitude of the threat has increased through better delivery systems, larger payloads, and variable tactics of attack. Thus, depths of 3,000 to 8,000 ft are being considered seriously for such facilities. Moreover, it appears desirable that the facilities be operational (if not totally complete) for defensive purposes within a five-year construction schedule. Deep excavations such as mines are similar in many respects to nearsurface tunnels and caverns for transit, rail, sewer, water, hydroelectric, and highway projects. But the differences that do exist are significant. Major distinctions between shallow and deep construction derive from the stress fields and behavior of earth materials around the openings. Different methodologies are required to accommodate other variations resulting from increased depth, such as elevated temperatures, reduced capability for site exploration, and limited access during project execution. This report addresses these and other questions devoted to geotechnical characterization, design, construction, and excavation equipment.

  4. Construction of high-rise building with underground parking in Moscow

    Directory of Open Access Journals (Sweden)

    Ilyichev Vyacheslav

    2018-01-01

    Full Text Available Paper presents results of scientific support to construction of unique residential building 108 m high with one storey underground part under high-rise section and 3-storey underground parking connected by underground passage. On-site soils included anthropogenic soil, clayey soils soft-stiff, saturated sands of varied grain coarseness. Design of retaining structure and support system for high-rise part excavation was developed. It suggested installation of steel pipes and struts. Construction of adjacent 3-storey underground parking by “Moscow method” is described in the paper. This method involves implementation of retaining wall consisted of prefabricated panels, truss structures (used as struts and reinforced concrete slabs. Also design and construction technology is provided for foundations consisted of bored piles 800 MM in diameter joined by slab with base widening diameter of 1500 MM. Experiment results of static and dynamic load testing (ELDY method are considered. Geotechnical monitoring data of adjacent building and utility systems settlement caused by construction of presented high-rise building were compared to numerical modelling results, predicted and permissible values.

  5. Construction of high-rise building with underground parking in Moscow

    Science.gov (United States)

    Ilyichev, Vyacheslav; Nikiforova, Nadezhda; Konnov, Artem

    2018-03-01

    Paper presents results of scientific support to construction of unique residential building 108 m high with one storey underground part under high-rise section and 3-storey underground parking connected by underground passage. On-site soils included anthropogenic soil, clayey soils soft-stiff, saturated sands of varied grain coarseness. Design of retaining structure and support system for high-rise part excavation was developed. It suggested installation of steel pipes and struts. Construction of adjacent 3-storey underground parking by "Moscow method" is described in the paper. This method involves implementation of retaining wall consisted of prefabricated panels, truss structures (used as struts) and reinforced concrete slabs. Also design and construction technology is provided for foundations consisted of bored piles 800 MM in diameter joined by slab with base widening diameter of 1500 MM. Experiment results of static and dynamic load testing (ELDY method) are considered. Geotechnical monitoring data of adjacent building and utility systems settlement caused by construction of presented high-rise building were compared to numerical modelling results, predicted and permissible values.

  6. Studies on engineering technologies in the Mizunami Underground Research Laboratory. FY 2007 (Contract research)

    International Nuclear Information System (INIS)

    Noda, Masaru; Suyama, Yasuhiro; Nobuto, Jun; Ijiri, Yuji; Mikake, Shinichiro; Matsui, Hiroya

    2009-07-01

    The Mizunami Underground Research Laboratory (MIU) of the Japan Atomic Energy Agency is a major site for geoscientific research to advance the scientific and technological basis for geological disposal of high-level radioactive waste in crystalline rock. Studies on relevant engineering technologies in the MIU consist of a) research on design and construction technology for very deep underground applications, and b) research on engineering technology as a basis of geological disposal. In the Second Phase of the MIU project (the construction phase), engineering studies have focused on research into design and construction technologies for deep underground. The main subjects in the study of very deep underground structures consist of the following: 'Demonstration of the design methodology', 'Demonstration of existing and supplementary excavation methods', 'Demonstration of countermeasures during excavation' and 'Demonstration of safe construction'. In the FY 2007 studies, identification and evaluation of the subjects for study of engineering technologies in the construction phase were carried out to optimize future research work. Specific studies included: validation of the existing design methodology based on data obtained during construction; validation of existing and supplementary rock excavation methods for very deep shafts; estimation of rock stability under high differential water pressures, methodology on long-term maintenance of underground excavations and risk management systems for construction of underground structures have been performed. Based on these studies, future research focused on the four subject areas, which are 'Demonstration of the design methodology', 'Demonstration of existing and supplementary excavation methods', 'Demonstration of countermeasures during excavation' and 'Demonstration of safe construction', has been identified. The design methodology in the first phase of the MIU Project (surface-based investigation phase) was verified to

  7. Study on construction technology for repository

    International Nuclear Information System (INIS)

    Tanai, Kenji; Iwasa, Kengo; Hasegawa, Hiroshi; Miura, Kazuhiko; Okutsu, Kazuo; Kobayashi, Masaaki

    1999-11-01

    For the construction of underground facilities comprising access tunnels, connecting tunnels, main tunnels and disposal tunnels, a large number of tunnels will be excavated in deep rock formations. These excavations will extend hundreds kilometers in total length. Therefore, special attention must be paid, to transporting large volume of debris, ventilation, emergency escape routes in case of accident, and other factors. In addition, special attention must also paid to potential accidents which might in underground excavations, including unstable facing phenomena (such as collapse and swelling of facing at weak layer sections), spring water flow resulting collapse of rock, gas eruption, and rock burst. While considering these factors to be emphasized during the construction of geological disposal facilities, the investigation reviewed the existing working methods on individual construction technologies of access tunnels, main tunnels, connecting tunnels, disposal tunnels, and disposal pit, based on the recognition that the present state deals with a wide range of geological environments, and conducted investigation about the construction methods for each tunnel on the basis current technologies, and described the outline of these methods. Furthermore, for the items to be particularly emphasized on site characterization and siting data such as ground pressure and spring water, the investigation reviewed the current countermeasure works, and made survey on the phenomena appeared during actual tunnel construction works and their countermeasures, and carried out a study on effectiveness of these countermeasures. This constructing of disposal site in deep geological formations is basically possible by applying, or confirming, current excavation technologies for tunnels and underground facilities. A systematic construction system combines separate technologies relating to construction, (excavation technology, tunnel support work method, etc.). Such systems can be

  8. Measurement plan and observational construction program on drift excavation at the Horonobe Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Yamasaki, Masanao; Yamaguchi, Takehiro; Funaki, Hironori; Fujikawa, Daisuke; Tsusaka, Kimikazu

    2008-09-01

    The Horonobe URL Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists of two major research areas, 'Geoscientific Research' and 'R and D' on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. On the Horonobe URL Project, 'Phase 1' was finished in 2005FY and construction of the underground facility was started since then. Now, 'Phase 2' (investigations during construction of the underground facilities) is on-going. On the 'Development of engineering techniques for use in the deep underground environment' in Phase 1, based on the various types of data acquired on investigations from the surface, the design of underground facility in advance was planned. At the inception of the Phase II investigations, an investigation report titled 'Measurement Plan and Observational Construction Program on Shaft Excavation at the Horonobe URL Project' (hereinafter referred to as 'Observational Construction Program') was published. The Observational Construction Program summarizes followings from the Phase I investigations: measurements for safety/reasonable construction, measurements for R and D on enhancement of shaft design/construction technology, and measurements for verification of the deep geological environment model estimated before shaft excavation, and it is on-going. This report summarizes the measurement plan during construction of drifts based on the design in advance and the observational construction program for feedback measurements data into design and construction on subsequent steps. This report also describes about design and construction management program of underground facility and R and D program on

  9. Study on engineering technologies in the Mizunami Underground Research Laboratory (FY 2015). Development of design and construction planning and countermeasure technologies (Contract research)

    International Nuclear Information System (INIS)

    Toguri, Satohito; Kobayashi, Shinji; Tsuji, Masakuni; Yahagi, Ryoji; Yamada, Toshiko; Matsui, Hiroya; Mikake, Shinichiro; Aoyagi, Yoshiaki; Sato, Toshinori

    2017-03-01

    The study on engineering technology in the Mizunami Underground Research Laboratory (MIU) project roughly consists of (1)development of design and construction planning technologies, (2)development of construction technology, (3)development of countermeasure technology, (4)development of technology for security, and (5) development of technologies regarding restoration and mitigating of the excavation effect. So far, the verification of the initial design based on the data obtained during excavation was mainly conducted as a research in the Construction Phase, also the countermeasure technologies to control groundwater inflow were examined as a research in the Operation Phase. In FY2015, as a part of the important issues on the research program, “Development of countermeasure technologies for reducing groundwater inflow” in the Japan Atomic Energy Agency 3rd Midterm Plan, water-tight grouting method has been developed. Grouting methods utilized in the MIU were evaluated and the post-excavation grouting at the -500m Access/Research Gallery-South was planned based on these evaluation results. Also, technology development from the viewpoint of geological disposal was summarized, and information on the alternative method to the grouting method was collected and organized. (author)

  10. Horonobe Underground Research Laboratory project. Plans of investigations during shaft and drift excavation (Construction of underground facilities: Phase II)

    International Nuclear Information System (INIS)

    2005-06-01

    Horonobe Underground Research Laboratory Project is planned for over 20 years to establish the scientific and technical basis for the underground disposal of high-level radioactive wastes in Japan. The investigations are conducted by JNC in three phases, from the surface (Phase I), during the construction of the underground facilities (Phase II), and using the facilities (Phase III). This report concerns the investigation plans for Phase II. During excavation of shafts and drifts, detailed geological and borehole investigation will be conducted and the geological model constructed in Phase I is evaluated and revised by newly acquired data of geophysical and geological environment. Detailed in-situ experiments, as well as the effects of shaft excavation, are also done to study long-term changes, rock properties, groundwater flow and chemistry to ensure the reliability of repository technology and establish safety assessment methodology. (S. Ohno)

  11. Evaluation method of radon preventing effect in underground construction

    International Nuclear Information System (INIS)

    Luo Shaodong; Deng Yuequan; Dong Faqin; Qu Ruixue; Xie Zhonglei

    2014-01-01

    Background: It's difficult to evaluate the radon prevention effect because of the short operating time of measuring instrument under the circumstances of high humidity in underground construction. Purpose: A new rapid method to evaluate the radon prevention efficiency of underground construction was introduced. Methods: The radon concentrations before and after shielding operation were determined, and according to the regularity of radon decay, the shielding rate can be calculated. Results: The results showed that radon shielding rate in underground construction remains generally stable with variation of time, and the actual relatively standard deviation was 3.95%. So the rapid determination and evaluation of radon preventing effect under special conditions in underground construction can be realized by taking shielding rate in a short time for the final shielding rate. Compared with those by the local static method in ground lab, the results were similar. Conclusion: This paper provided a prompt, accurate and practicable way for the evaluation of radon prevention in underground construction, having a certain reference value. (authors)

  12. Development of excavation technologies at the Canadian underground research laboratory

    International Nuclear Information System (INIS)

    Kuzyk, Gregory W.; Martino, Jason B.

    2008-01-01

    Several countries, Canada being among them, are developing concepts for disposal of used fuel from power generating nuclear reactors. As in underground mining operations, the disposal facilities will require excavation of many kilometres of shafts and tunnels through the host rock mass. The need to maintain the stability of excavations and safety of workers will be of paramount importance. Also, excavations required for many radioactive waste repositories will ultimately need to be backfilled and sealed to maintain stability and minimize any potential for migration of radionuclides, should they escape their disposal containers. The method used to excavate the tunnels and shafts, and the rock damage that occurs due to excavation, will greatly affect the performance characteristics of repository sealing systems. The underground rock mechanics and geotechnical engineering work performed at the Canadian Underground Research Laboratory (URL) has led to the development of excavation technologies that reduce rock damage in subsurface excavations. This paper discusses the excavation methods used to construct the URL and their application in planning for the construction of similar underground laboratories and repositories for radioactive wastes. (author)

  13. Design, construction and initial state of the underground openings

    International Nuclear Information System (INIS)

    2010-12-01

    The report is included in a set of Production reports, presenting how the KBS-3 repository is designed, produced and inspected. The set of reports is included in the safety report for the KBS-3 repository and repository facility. The report provides input on the initial state of the underground openings for the assessment of the long-term safety, SR-Site. The initial state refers to the properties of the underground openings at final disposal, backfilling or closure. In addition, the report provides input to the operational safety report, SR-Operation, on how the underground openings shall be constructed and inspected. The report presents the design premises and the methodology applied to design the underground openings and adapt them the to the site conditions so that they conform to the design premises. It presents the reference design at Forsmark and its conformity to the design premises. It also describes the reference methods to be applied to construct and inspect the different kinds of underground openings. Finally, the initial state of the underground openings and its conformity to the design premises is presented

  14. Design, construction and initial state of the underground openings

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    The report is included in a set of Production reports, presenting how the KBS-3 repository is designed, produced and inspected. The set of reports is included in the safety report for the KBS-3 repository and repository facility. The report provides input on the initial state of the underground openings for the assessment of the long-term safety, SR-Site. The initial state refers to the properties of the underground openings at final disposal, backfilling or closure. In addition, the report provides input to the operational safety report, SR-Operation, on how the underground openings shall be constructed and inspected. The report presents the design premises and the methodology applied to design the underground openings and adapt them the to the site conditions so that they conform to the design premises. It presents the reference design at Forsmark and its conformity to the design premises. It also describes the reference methods to be applied to construct and inspect the different kinds of underground openings. Finally, the initial state of the underground openings and its conformity to the design premises is presented

  15. 77 FR 49722 - Cranes and Derricks in Construction: Demolition and Underground Construction

    Science.gov (United States)

    2012-08-17

    ... underground construction work. Therefore, when OSHA promulgates a new final rule, states and territories with... used in construction work. For most construction work, the final rule replaced a prior cranes and... construction work. Through this direct final rule, OSHA is applying the updated requirements to that work. With...

  16. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  17. Construction experiences from underground works at Forsmark. Compilation Report

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Anders [Vattenfall Power Consultant AB, Stockholm (Sweden); Christiansson, Rolf [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)

    2007-02-15

    The main objective with this report, the Construction Experience Compilation Report (CECR), is to compile experiences from the underground works carried out at Forsmark, primarily construction experiences from the tunnelling of the two cooling water tunnels of the Forsmark nuclear power units 1, 2 and 3, and from the underground excavations of the undersea repository for low and intermediate reactor waste, SFR. In addition, a brief account is given of the operational experience of the SFR on primarily rock support solutions. The authors of this report have separately participated throughout the entire construction periods of the Forsmark units and the SFR in the capacity of engineering geologists performing geotechnical mapping of the underground excavations and acted as advisors on tunnel support; Anders Carlsson participated in the construction works of the cooling water tunnels and the open cut excavations for Forsmark 1, 2 and 3 (geotechnical mapping) and the Forsmark 3 tunnel (advise on tunnel support). Rolf Christiansson participated in the underground works for the SFR (geotechnical mapping, principal investigator for various measurements and advise on tunnel support and grouting). The report is to a great extent based on earlier published material as presented in the list of references. But it stands to reason that, during the course of the work with this report, unpublished notes, diaries, drawings, photos and personal recollections of the two authors have been utilised in order to obtain such a complete compilation of the construction experiences as possible.

  18. Construction experiences from underground works at Forsmark. Compilation Report

    International Nuclear Information System (INIS)

    Carlsson, Anders; Christiansson, Rolf

    2007-02-01

    The main objective with this report, the Construction Experience Compilation Report (CECR), is to compile experiences from the underground works carried out at Forsmark, primarily construction experiences from the tunnelling of the two cooling water tunnels of the Forsmark nuclear power units 1, 2 and 3, and from the underground excavations of the undersea repository for low and intermediate reactor waste, SFR. In addition, a brief account is given of the operational experience of the SFR on primarily rock support solutions. The authors of this report have separately participated throughout the entire construction periods of the Forsmark units and the SFR in the capacity of engineering geologists performing geotechnical mapping of the underground excavations and acted as advisors on tunnel support; Anders Carlsson participated in the construction works of the cooling water tunnels and the open cut excavations for Forsmark 1, 2 and 3 (geotechnical mapping) and the Forsmark 3 tunnel (advise on tunnel support). Rolf Christiansson participated in the underground works for the SFR (geotechnical mapping, principal investigator for various measurements and advise on tunnel support and grouting). The report is to a great extent based on earlier published material as presented in the list of references. But it stands to reason that, during the course of the work with this report, unpublished notes, diaries, drawings, photos and personal recollections of the two authors have been utilised in order to obtain such a complete compilation of the construction experiences as possible

  19. Siting, design and construction of underground repositories for radioactive wastes

    International Nuclear Information System (INIS)

    1986-01-01

    The objectives of the Symposium were to provide a forum for exchange of information internationally on the various scientific, technological, engineering and safety bases for the siting, design and construction of underground repositories, and to highlight current important issues and identify possible approaches. Forty-nine papers were presented, covering general approaches and regulatory aspects, disposal in shallow ground and rock cavities, disposal in deep geological formations and safety assessments related to the subject of the Symposium. Separate abstracts were prepared for each of these papers

  20. 76 FR 8782 - Underground Construction Standard; Extension of the Office of Management and Budget's (OMB...

    Science.gov (United States)

    2011-02-15

    ...] Underground Construction Standard; Extension of the Office of Management and Budget's (OMB) Approval of... Underground Construction (29 CFR 1926.800). DATES: Comments must be submitted (postmarked, sent, or received...). Seven paragraphs in the Underground Construction Standard (``the Standard''), 29 CFR 1926.800, require...

  1. FORECAST OF INFLUENCING THE UNDERGROUND COMPLEX CONSTRUCTION ON A CONTEXT AREA

    Directory of Open Access Journals (Sweden)

    Orekhov Vyacheslav Valentinovich

    2017-08-01

    Full Text Available The present paper is concerned with the method, research objective and the results of numerical simulation of change of stress-strain behaviour of soil masses when constructing underground complex. In order to get consistent results of forecast, all major factors affecting the results of design studies have been taken into account, including spatial performance of soil mass, enclosure structure and an adjacent context area, phasing of construction, site investigation, initial stress-strain behaviour of soil mass and elasto-plastic strain of soils. The authors give assessment of influence of pit excavation and subsequent construction on a context adjacent area and construction of an underground railroad. Results of the studies show that the proposed construction of an underground complex on the Tverskaya Zastava square would not have a significant impact on the surrounding buildings and subway structures. The spreading of the subsidence crater around the excavating pit is projected by 30...80 m. The ground lift directly below the bottom of the excavation pit in the places of metro stations and transport tunnels will be about 0.1 cm.

  2. Underground reactor containments: An option for the future?

    International Nuclear Information System (INIS)

    Forsberg, C.W.; Kress, T.

    1997-01-01

    Changing world conditions and changing technologies suggest that serious consideration should be given to siting of nuclear power plants underground. Underground siting is not a new concept. Multiple research reactors, several weapons production reactors, and one power reactor have been built underground. What is new are the technologies and incentives that may now make underground siting a preferred option. The conditions and technologies, along with their implications, are discussed herein. Underground containments can be constructed in mined cavities or pits that are then backfilled with thick layers of rock and soil. Conventional above-ground containments resist assaults and accidents because of the strength of their construction materials and the effectiveness of their safety features that are engineered to reduce loads. However, underground containments can provide even more resistance to assaults and accidents because of the inertia of the mass of materials over the reactor. High-technology weapons or some internal accidents can cause existing strong-material containments to fail, but only very-high energy releases can move large inertial masses associated with underground containments. New methods of isolation may provide a higher confidence in isolation that is independent of operator action

  3. Underground openings production line 2012. Design, production and initial state of the underground openings

    International Nuclear Information System (INIS)

    2013-08-01

    methods for the construction of all the particular underground openings are presented, including such aspects as investigations during tunnelling, methods of grouting, geometrical tolerances, the methodology for accepting deposition holes, etc. The potential hazards associated with the construction of these underground openings relative to the design requirements and design specifications are also presented with reference to deposition tunnels, deposition holes and other underground rooms. Posiva has demonstrated that both the deposition tunnels and deposition holes can be produced based on current requirements and specifications and using current technology, although there are likely to be further advances in the development of construction techniques. (orig.)

  4. Review of underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    1974-01-01

    A review of the potential for the underground siting of nuclear power generating plants has been undertaken. The review comprised a survey and assessment of relevant published documents currently available, together with discussions with Government sponsored agencies and other bodies, to evaluate the current status of technology related to the design and construction of underground nuclear power plants. It includes a review of previous work related to the underground siting of power plants and other facilities; a preliminary evaluation of the relative merits of the various concepts of undergrounding which have been proposed or constructed; a review of current technology as it relates to the requirements for the design, construction and operation of underground nuclear power plants; an examination of the safety and environmental aspects; and the identification of areas of further study which will be required if the underground is to be established as a fully viable alternative to surface siting. No attempt has been made to draw final conclusions at this stage. Nothing has been found to suggest that the underground siting concept could not provide a viable alternative to the surface concept. It is also apparent that no major technological developments are required. It is not clear, however, whether the improvements in safety and containment postulated for the underground can be realized at an economic cost; or even whether any additional cost is in fact involved. The problem is essentially site dependent and requires further study for which recommendations are made. (auth)

  5. Underground communications and tracking technology advances

    Energy Technology Data Exchange (ETDEWEB)

    Fiscor, S

    2007-03-15

    As the June 2009 deadline set by the MINER Act grows near, several technologies have emerged as possible options for communicating and tracking underground coal miners in the event of an emergency or disaster. NIOSH is currently deciding how best to invest $10 million assigned by Congress under an Emergency Supplementary Appropriations Act (ESA) to research and develop mine safety technology. Medium and ultra high frequency (UHF) systems seem to be leading the pack with radio frequency identification (RFID) tags serving as the tracking system. Wireless mesh systems can serve as a communications infrastructure and they can do much more. Even more technologies continue to emerge, such as inertial navigation tracking systems. Mines are discovering the wonders of modern voice and data communications underground. Still no one know if it is economically practical to design a system that will function after a coal mine explosion. From the nineteen systems submitted to MSHA's request for information (RFI), six systems were selected that represented most of the technologies that had been proposed: the Rajant Breadcrumb, Innovative Wireless, Concurrent Technologies/Time Domain, Transtek, Gamma Services, and the Kutta Consulting systems. They were tested at CONSOL Energy's McElroy mine in April 2006. MSHA felt that all of those systems needed a significant amount of work before they were ready for use in a underground coal mining environment. The agency continues to work with these, and other manufacturers, to assist in arranging for field demonstration and then to gain MSHA approval.

  6. Construction experiences from underground works at Oskarshamn. Compilation report

    International Nuclear Information System (INIS)

    Carlsson, Anders; Christiansson, Rolf

    2007-12-01

    The main objective with this report is to compile experiences from the underground works carried out at Oskarshamn, primarily construction experiences from the tunnelling of the cooling water tunnels of the Oskarshamn nuclear power units 1,2 and 3, from the underground excavations of Clab 1 and 2 (Central Interim Storage Facility for Spent Nuclear Fuel), and Aespoe Hard Rock Laboratory. In addition, an account is given of the operational experience of Clab 1 and 2 and of the Aespoe HRL on primarily scaling and rock support solutions. This report, as being a compilation report, is in its substance based on earlier published material as presented in the list of references. Approximately 8,000 m of tunnels including three major rock caverns with a total volume of about 550,000 m 3 have been excavated. The excavation works of the various tunnels and rock caverns were carried out during the period of 1966-2000. In addition, minor excavation works were carried out at the Aespoe HRL in 2003. The depth location of the underground structures varies from near surface down to 450 m. As an overall conclusion it may be said that the rock mass conditions in the area are well suited for underground construction. This conclusion is supported by the experiences from the rock excavation works in the Simpevarp and Aespoe area. These works have shown that no major problems occurred during the excavation works; nor have any stability or other rock engineering problems of significance been identified after the commissioning of the Oskarshamn nuclear power units O1, O2 and O3, BFA, Clab 1 and 2, and Aespoe Hard Rock Laboratory. The underground structures of these facilities were built according to plan, and since than been operated as planned. Thus, the quality of the rock mass within the construction area is such that it lends itself to excavation of large rock caverns with a minimum of rock support

  7. Construction experiences from underground works at Oskarshamn. Compilation report

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Anders (Vattenfall Power Consultant AB, Stockholm (SE)); Christiansson, Rolf (Swedish Nuclear Fuel and Waste Management Co., Stockholm (SE))

    2007-12-15

    The main objective with this report is to compile experiences from the underground works carried out at Oskarshamn, primarily construction experiences from the tunnelling of the cooling water tunnels of the Oskarshamn nuclear power units 1,2 and 3, from the underground excavations of Clab 1 and 2 (Central Interim Storage Facility for Spent Nuclear Fuel), and Aespoe Hard Rock Laboratory. In addition, an account is given of the operational experience of Clab 1 and 2 and of the Aespoe HRL on primarily scaling and rock support solutions. This report, as being a compilation report, is in its substance based on earlier published material as presented in the list of references. Approximately 8,000 m of tunnels including three major rock caverns with a total volume of about 550,000 m3 have been excavated. The excavation works of the various tunnels and rock caverns were carried out during the period of 1966-2000. In addition, minor excavation works were carried out at the Aespoe HRL in 2003. The depth location of the underground structures varies from near surface down to 450 m. As an overall conclusion it may be said that the rock mass conditions in the area are well suited for underground construction. This conclusion is supported by the experiences from the rock excavation works in the Simpevarp and Aespoe area. These works have shown that no major problems occurred during the excavation works; nor have any stability or other rock engineering problems of significance been identified after the commissioning of the Oskarshamn nuclear power units O1, O2 and O3, BFA, Clab 1 and 2, and Aespoe Hard Rock Laboratory. The underground structures of these facilities were built according to plan, and since than been operated as planned. Thus, the quality of the rock mass within the construction area is such that it lends itself to excavation of large rock caverns with a minimum of rock support

  8. Comprehensive evaluation of environmental and economic benefits of China's urban underground transportation construction projects.

    Science.gov (United States)

    Yang, Xiaobin; Chen, Zhilong; Guo, Dongjun

    2015-07-01

    Urban underground transportation projects are introduced to address problems of scarce green land and traffic pollution. As construction of urban underground transportation is still in its infancy, there is no definite quantitative measurement on whether the construction is beneficial and what influences it will place on the region in China. This study intends to construct a comprehensive evaluation method for evaluating social, economic and environmental benefits of urban underground transportation projects and proposes the concept, role and principle for evaluation of environmental and economic benefits. It figures out relationship between the environment and factors of city development. It also summarizes three relevant factors, including transportation, biophysics and social economy, and works out indicators to evaluate the influence of urban underground transportation construction. Based on Contingent Valuation Method (CVM), Cost of Illness Approach (CIA), Human Capital Approach (HCA), this paper constructs 13 monetization calculation models for social, economic and environmental benefits in response to seven aspects, namely, reducing noise pollution and air pollution, using land efficiently, improving traffic safety, reducing traffic congestion, saving shipping time and minimizing transportation costs.

  9. Underground openings in clay formations - Technical requirements on drifting technology and support systems for underground openings and their impact on retreat systems for the installation of engineered barriers

    International Nuclear Information System (INIS)

    Mischo, Helmut

    2012-01-01

    well as the development of adapted mining and excavation methods. Other fields which have to be considered are the special requirements on the suitable support technology and systems, the necessary support installation technology and also time requirements. Most of these special requirements can also be applied to the excavation of large-scale underground openings in mud-stone and can thus provide additional information for the design and development of underground repositories in clay formations. While most information can be transferred directly from commercial mining to the excavation of a repository, there are some areas where the available data only provides some sort of basic information. One example for this is the fact that the retreat from old workings and the sealing of drifts and tunnels already requires a highly developed and adopted technology in normal clay mining operations. For the successful long-term sealing of a repository, However, the immediate expansion of the pre-stressed clay after the extraction of support units and the simultaneously starting creeping requests an even more sophisticated dam construction technology for the refinement of radioactive waste to guarantee highest quality of the dam itself. This has to include, amongst other things, excellent bonding between construction material and host rock to ensure lowest possible leakage. This paper gives a detailed overview of the technical and technological methods currently used in clay mining and the significant differences to all other types of mining operations. For each stage of the technical construction process of underground openings in clay formations it highlights the information that could be transferred to the construction of this type of underground repositories. It also shows some of the areas where the database is still limited or incomplete and thus where further research and development work is necessary for a successful technical solution for radioactive waste confinement in

  10. Plan of deep underground construction for investigations on high-level radioactive waste storage

    International Nuclear Information System (INIS)

    Mayanovskij, M.S.

    1996-01-01

    The program of studies of the Japanese PNC corporation on construction of deep underground storage for high-level radioactive wastes is presented. The program is intended for 20 years. The total construction costs equal about 20 billion yen. The total cost of the project is equal to 60 billion yen. The underground part is planned to reach 1000 m depth

  11. Civil Engineering Construction of Underground Works

    CERN Document Server

    Rammer, H

    1999-01-01

    For the first time at CERN, new shafts and caverns will be excavated inside a surface building. The LHC civil engineering construction for the ATLAS experiment has been designed such that the experimental hall will be completed to the extent that it can provide a secure, weatherproof and sound insulated covering to the shaft excavation area. The construction of the two access shafts and the experimental cavern will follow and will be carried out inside the building. This unconventional method of working allows the excavation of the Molasse rock in the dry, which is essential for this type of rock, and ensures reduced environmental pollution by noise and dust. The paper will present the technical infrastructure required for this particular construction method, explain its advantages and disadvantages, and compare it with a conventional method of underground excavations to be used on the same work site for the construction of the service cavern.

  12. Blasting Impact by the Construction of an Underground Research Tunnel in KAERI

    International Nuclear Information System (INIS)

    Kwon, S.; Cho, W. J.

    2005-12-01

    The underground research tunnel, which is under construction in KAERI for the validation of HLW disposal system, is excavated by drill and blasting method using high-explosives. In order not to disturb the operation at the research facilities such as HANARO reactor, it is critical to develop a blasting design , which will not influence on the facilities, even though several tens of explosives are detonated almost simultaneously. To develop a reasonable blasting design, a test blasting at the site should be performed. A preliminary analysis for predicting the expected vibration and noise by the blasting for the construction of the underground research tunnel was performed using a typical empirical equation. From the study, a blasting design could be developed not to influence on the major research facilities in KAERI. For the validation of the blasting design, a test blasting was carried out at the site and the parameters of vibration equation could be determined using the measured data during the test blasting. Using the equation, it was possible to predict the vibration at different locations at KAERI and to conclude that the blasting design would meet the design criteria at the major facilities in KAERI. The study would verify the applicability of blasting method for the construction of a research tunnel in a rock mass and that would help the design and construction of large scale underground research laboratory, which might be carried out in the future. It is also meaningful to accumulate technical experience for enhancing the reliability and effectiveness of the design and construction of the HLW disposal repository, which will be constructed in deep underground by drill and blasting technique

  13. Virtual Reality in Presentation of the Underground Mine Technological Process

    Directory of Open Access Journals (Sweden)

    Kodym Oldøich

    2003-09-01

    Full Text Available Virtual Reality in Presentation of the Underground Mine Technological Process focuses on methods of presentation of an underground mine technologies in intranet technology. It shows usage of platform independent VRML client for presentation of static and dynamic information about technological process. Bi-directional interactions between client and process information database are solved.Based on analysis of technological process of underground mine a database structure was designed. It is skeleton for storing all information about any underground mine. This skeleton can be modified in any direction. Data in this "static model" of underground mine can be applied for visualization in VRML environment. In this way it is possible to simplify and unify a user's front-end for all kinds of tasks.All designed scenes can be interactively displayed in full view or in any detail view, so that a user is able to recognize every important part of installed equipment, its stage, technical parameters and other information. If manufacturers of mining equipment will supply VRML model of their real products everybody would be able to place it into VRML scene and learn everything about it.This work explores and tries to enlighten some of the areas and available approaches compliant with VRML 97 specification of modifying static scene by its browser. Concepts of animation pipeline, inside and outside scripting in scene displayed and authoring of VRML targeted geometry are discussed including database connectivity.

  14. Groundwater flow modeling in construction phase of the Mizunami Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Onoe, Hironori; Saegusa, Hiromitsu; Takeuchi, Ryuji

    2016-01-01

    This paper comprehensively describes the result of groundwater flow modeling using data of hydraulic responses due to construction of Mizunami Underground Research Laboratory (MIU) in Mizunami, Gifu, in order to update hydrogeological model based on stepwise approach for crystalline fractured rock in Japan. The results showed that large scale hydraulic compartment structures which has significant influence on change of groundwater flow characteristics are distributed around MIU. Furthermore, it is concluded that hydrogeological monitoring data and groundwater flow modeling during construction of deep underground facilities are effective for hydrogeological characterization of heterogeneous fractured rock. (author)

  15. Development and enhancement of grouting technologies in the Mizunami Underground Research Laboratory (Contract research)

    International Nuclear Information System (INIS)

    Nobuto, Jun; Mikake, Shinichiro

    2008-03-01

    In the Tono Geoscience Center of Japan Atomic Energy Agency (hereafter, JAEA), Mizunami Underground Research Laboratory project is being advanced to develop a scientific and technological basis for geological disposal. The concept of geological disposal is based on a multi-barrier system which combines a stable geological environment with an engineered barrier system (EBS). In order to develop a engineering basis for the construction of disposal system, the enhancement of grouting technologies among engineering technologies is needed. In this study, the comprehensive performance of suspension type grouting materials to seal rock fractures encountered in excavation works at deep underground has been checked, and the clogging phenomenon at the entrance of rock fractures has been investigated following the previous year. Research issues are as follows; Study on grouting concept to secure high-level water sealing, study on the test method to check grout clogging under high injection pressure, study on grouting material which can penetrate into finer fractures. Among these, in the study on penetrability test method, prototype test instruments were made and a series of preliminary tests were conducted. (author)

  16. Research on Construction Optimization of Three-Connected-Arch Hydraulic Underground Cavities Considering Creep Property

    Directory of Open Access Journals (Sweden)

    Bao-yun Zhao

    2014-01-01

    Full Text Available In order to prevent the creep of surrounding rock in long-term construction, with consideration of different construction methods and other factors during the construction of large-scale underground cavity, three different construction schemes are designed for specific projects and a nonlinear viscoelastic-plastic creep model which can describe rock accelerated creeping is introduced and applied to construction optimization calculation of the large-scale three-connected-arch hydraulic underground cavity through secondary development of FLAC3D. The results show that the adoption of middle cavity construction method, the second construction method, enables the maximum vault displacement of 16.04 mm. This method results in less stress redistribution and plastic zone expansion to the cavity’s surrounding rock than the other two schemes, which is the safest construction scheme. The conclusion can provide essential reference and guidance to similar engineering for construction optimization.

  17. Case study of siting technology for underground nuclear power plant

    International Nuclear Information System (INIS)

    Hibino, Satoshi; Komada, Hiroya; Honsho, Shizumitsu; Fujiwara, Yoshikazu; Motojima, Mutsumi; Nakagawa, Kameichiro; Nosaki, Takashi

    1991-01-01

    Underground siting method is one of new feasible siting methods for nuclear power plants. This report presents the results on case studies on underground siting. Two sites of a steeply inclined and plateau like configurations were selected. 'Tunnel type cavern; all underground siting' method was applied for the steeply inclined configuration, and 'shaft type semi-cavern; partial underground siting' method was applied for the plateau like configuration. The following designs were carried out for these two sites as case studies; (1) conceptual designs, (2) geological surveys and rock mechanics tests, (3) stability analysis during cavern excavations, (4) seismic stability analysis of caverns during earthquake, (5) reinforcement designs for caverns, (6) drainage designs. The case studies showed that these two cases were fully feasible, and comparison between two cases revealed that the 'shaft type semi-cavern; partial underground siting' method was more suitable for Japanese islands. As a first step of underground siting, therefore, the authors recommend to construct a nuclear power plant by this method. (author)

  18. Dynamic underground stripping. Innovative technology summary report

    International Nuclear Information System (INIS)

    1995-04-01

    Dynamic Underground Stripping (DUS) is a combination of technologies targeted to remediate soil and ground water contaminated with organic compounds. DUS is effective both above and below the water table and is especially well suited for sites with interbedded sand and clay layers. The main technologies comprising DUS are steam injection at the periphery of a contaminated area to heat permeable subsurface areas, vaporize volatile compounds bound to the soil, and drive contaminants to centrally located vacuum extraction wells; electrical heating of less permeable sediments to vaporize contaminants and drive them into the steam zone; and underground imaging such as Electrical Resistance Tomography to delineate heated areas to ensure total cleanup and process control. A full-scale demonstration was conducted on a gasoline spill site at Lawrence Livermore National Laboratory in Livermore, California from November 1992 through December 1993

  19. Horonobe Underground Research Laboratory Project. Plans for surface-based investigations. Phase 1

    International Nuclear Information System (INIS)

    Goto, Junichi; Hama, Katsuhiro

    2003-10-01

    The Horonobe Underground Research Laboratory Project is an investigation project which is planned over 20 years. The investigations are conducted in the three phases: investigations from surface (Phase 1), investigations during construction of the underground facility (Phase 2) and investigations using the facility (Phase 3). Taking into account the results from 'H12: Project of Establish the Scientific and Technical Basis for HLW Disposal in Japan - Second Progress Report on Research and Development for the Geological Disposal of HLW in Japan-' (JNC, 2000), research and development goals for the Horonobe URL project were re-defined as follows; a) Development of investigation technologies for the geological environment, b) Development of monitoring technologies for the geological environment, c) Study on the long-term stability of the geological environment, d) Development of the basis for engineering technologies in deep underground, e) Verification of technologies for engineered barriers, f) Development of detailed designing technologies of the repositories, and g) Improvement of safety assessment methodologies. Investigations for the goals a) to d) and e) to g) are conducted in the 'Geoscientific Research' and 'Research and Development on Geological Disposal', respectively. In Phase 1, a 'laboratory construction area' of a few kilometers square is selected based on the results from early stage investigations. Subsequent investigations are concentrated in the selected area and its periphery. Acquisition of data by surface-based investigations, modeling of the geological environment and predictions of changes in the geological environment caused by the construction of the underground facility, are conducted in a) Development of investigation technologies for the geological environment. Development and installation of monitoring equipments and data acquisition prior to the construction of the underground facility fall under b) Development of monitoring technologies

  20. Contracting practices for the underground construction of the Superconducting Super Collider

    International Nuclear Information System (INIS)

    1989-01-01

    This report was prepared by a specially appointed committee under the auspices of the National Academy of Sciences/National Research Council to address contracting and associated management issues essential to the successful execution of underground construction for the Superconducting Super Collider

  1. FORECAST OF INFLUENCING THE UNDERGROUND COMPLEX CONSTRUCTION ON A CONTEXT AREA

    OpenAIRE

    Orekhov Vyacheslav Valentinovich; Alekseev German Valer’evich

    2017-01-01

    The present paper is concerned with the method, research objective and the results of numerical simulation of change of stress-strain behaviour of soil masses when constructing underground complex. In order to get consistent results of forecast, all major factors affecting the results of design studies have been taken into account, including spatial performance of soil mass, enclosure structure and an adjacent context area, phasing of construction, site investigation, initial stress-strain be...

  2. Safety risk management of underground engineering in China: Progress, challenges and strategies

    Directory of Open Access Journals (Sweden)

    Qihu Qian

    2016-08-01

    Full Text Available Underground construction in China is featured by large scale, high speed, long construction period, complex operation and frustrating situations regarding project safety. Various accidents have been reported from time to time, resulting in serious social impact and huge economic loss. This paper presents the main progress in the safety risk management of underground engineering in China over the last decade, i.e. (1 establishment of laws and regulations for safety risk management of underground engineering, (2 implementation of the safety risk management plan, (3 establishment of decision support system for risk management and early-warning based on information technology, and (4 strengthening the study on safety risk management, prediction and prevention. Based on the analysis of the typical accidents in China in the last decade, the new challenges in the safety risk management for underground engineering are identified as follows: (1 control of unsafe human behaviors; (2 technological innovation in safety risk management; and (3 design of safety risk management regulations. Finally, the strategies for safety risk management of underground engineering in China are proposed in six aspects, i.e. the safety risk management system and policy, law, administration, economy, education and technology.

  3. Study on construction method of concrete in the underground research laboratory

    International Nuclear Information System (INIS)

    Iriya, Keshiro; Mikami, Tetsuji; Yasuoka, Tetsuji; Uegaki, Yoshiaki

    2001-05-01

    Although there are several types in low alkalinity cements, highly fly ash contained silicafume cement (HFSC) has been studied in JNC. It is demonstrated that pH of pore water of the cement indicates below 10.5 as results of other TRU study. However although chemical properties and basic mechanical behavior are well understood, workability so on in constructing is little investigated. Since the underground research laboratory plays a important role in investigating constructing technology, HFSC will be adopted for supporting rock cavern so on. It is required that workability of low alkalinity cements should be assessed. Major performance of workability in tunnel construction in rock will be investigated and R and D planning will be done toward the laboratory construction. Conclusion obtained in this study is described as followings. 1) As results of laboratory test, HFSC and LHHPC developed by AECL fulfil the requirements of shotcrete using by hardening accelerator with calcium-salpho-aluminate. It is concluded that HFSC and LHHPC can be applied for shotcrete. 2) The experiment upon corrosion of re-bars by facing saline water at a offshore is planned. 3) It is noted that pH decreases significantly with rise of silicafume content and that silicafume should be used as much as OPC. 4) It is investigated where the low alkalinity cement should be applied in a actual radio waste repository and R and D program in the laboratory is planned. (author)

  4. Underground coal mining technology - the future

    Energy Technology Data Exchange (ETDEWEB)

    Lama, R P [Kembla Coal and Coke Pty Limited, Wollongong, NSW (Australia)

    1989-01-01

    Discusses development of underground coal mining in Australia in the last four decades. The following aspects are reviewed: technology for underground mining (longwall mining, unidirectional cutting, bidirectional cutting, operation of more than one shearer on a working face, optimum dimensions of longwall blocks), longwall productivity (productivity increase will depend on increasing the availability factor of equipment, reducing failures due to human errors, organizational models, improving on-site decision making, improving monitoring, maintenance, planning and scheduling, concept of 'Transparent Mine'), roadway development systems (types of heading machines, standard systems for mine drivage and roof bolting and their productivity), size of coal mines, man and material transport systems (20,000-30,000 t/d from a single longwall face, mine shafts with a diameter 9-10 m), mine layout design (layout of longwall blocks, main intakes and returns situated in rock layers), mine environmental systems (ventilation systems, gas control), management, training and interpersonal relationships. Future coal mines will be developed with an integral capacity of 8-10 Mt/a from a single longwall operation with main development arteries placed in rocks. Development of gate roadways will require novel solutions with continuous cutting, loading and bolting. Information technology, with the concept of 'transparent mine', will form the backbone of decision making.

  5. Principal provisions of engineering and geological survey methodology in designing and construction of underground laboratory as a part of facility of RW underground isolation

    International Nuclear Information System (INIS)

    Prokopova, O.A.

    2006-01-01

    The most critical moment is the choice of a site for radioactive waste geological repository. Here the role of engineering and geological prospecting as a basis for the construction of a facility for underground isolation appears especially important; it is followed by finding a suitable area and subsequent allocation of the site and facility construction sites. The decision on the selection of construction site for the underground repository is taken by the principle 'descent from the general to the particular', which is a continuous process with the observance of stages in research for the design and exploration work. Each stage of research is typified by specific scale and methods of geological and geophysical studies and scientific research to be fulfilled in scopes sufficient for solution of basic problems for the designing. (author)

  6. Design study of the underground facilities, the Mizunami Underground Research Laboratory

    International Nuclear Information System (INIS)

    Ishizuka, Mineo; Noda, Masaru; Shiogama, Yukihiro; Adachi, Tetsuya

    1999-02-01

    Geoscientific research on the deep geological environment has been performed by Japan Nuclear Cycle Development Institute (JNC). This research is supported by the 'Long-Term Program for Research, Development and Utilization of Nuclear Energy'. The Mizunami Underground Research Laboratory (MIU) is planned to be constructed at the Shobasama-bora site belonging to JNC. A wide range of geoscientific research and development activities which have been previously performed in and around the Tono mine is planned to be expanded in the laboratory. The MIU consisted of surface and underground facilities excavated to a depth of about 1,000 meters. In this design study, the overall layout and basic design of the underground facility and the composition of the overall research program, includes the construction of the underground facility are studied. Based on the concept of the underground facility which have been developed in 1998, the research activities which will be performed in the MIU are selected and the overall research program is revised in this year. The basic construction method and the construction equipment are also estimated. (author)

  7. Design study of underground facility of the Mizunami Underground Research Laboratory

    International Nuclear Information System (INIS)

    Ishizuka, Mineo; Noda, Masaru; Shiogama, Yukihiro; Adachi, Tetsuya

    1999-02-01

    Geoscientific research on deep geological environment has been performed by Japan Nuclear Cycle Development Institute (JNC). This research is supported by the 'Long-Term Program for Research, Development and Utilization of Nuclear Energy'. The Mizunami Underground Research Laboratory (MIU) is planned to be constructed at Shobasama-bora site belonging to JNC. A wide range of geoscientific research and development activities which have been previously performed in and around the Tono mine is planned to be expanded in the laboratory. The MIU is consisted of surface and underground facilities down to the depth of about 1,000 meters. In this design study, the overall layout and basic design of the underground facility and the composition of the overall research program which includes the construction of the underground facility are studied. Based on the concept of the underground facility which have been developed last year, the research activities which will be performed in the MIU are selected and the overall research program is revised in this year. The basic construction method and the construction equipment are also estimated. (author)

  8. Study on construction method of concrete in the underground research laboratory. 4

    International Nuclear Information System (INIS)

    Iriya, Keishiro; Tajima, Takatoshi; Noda, Masaru

    2004-02-01

    Low alkaline cement is planned to use in construction of Horonobe Underground Research Center as one of in situ experiments. These experiments will be carried out in a part of the vertical shafts and horizontal excavated tunnels. The problems in actual using should be solved and improved until starting construction. This study has been carried out in order to improve the HFSC taking the Horonobe environment into account. Model analysis and preliminary laboratory experiment on hyper alkaline alteration of bentonite and rock have been carried out. And a long term permeability experiment on procedure. (author)or the superfluous exposure dose prevention in IVRbased on results of pH measuring for 546 days and geo-chemical code. Open data and undefined reaction were pointed out in order to accomplish the model on low alkalinity cement with high pozollan content. The effects on fresh concrete properties and harden concrete due to changing properties of fly ash were investigated. Experimental basic planning in situ test of low alkaline cement in Horonobe are proposed. And finally, procedure of improvement HFSC in Horonobe construction are investigated and proposed. It is concluded that HFSC can be applied for construction work of Horonobe underground research center. (author)

  9. Construction of an underground facility for ''in-situ'' experimentation in the boom clay

    International Nuclear Information System (INIS)

    Bonne, A.; Manfroy, P.; Van Haelewijn, R.; Heremans, R.

    1985-01-01

    The Belgian R and D Programme concerning the disposal of high-level and alpha-bearing radioactive waste in continental geological formations was launched by SCK/CEN, Mol in 1974. The programme is characterised by its site and formation specific approach, i.e. Mol and Boom clay. In the framework of site confirmation, an important issue is the ''in situ'' experimentation which should allow to determine with a higher degree of confidence the numerical value of the data needed for the evaluations, assessments and designs. The present report deals with the construction of an underground experimental facility, which was scheduled to be fully completed in mid 1984. Initially, the completion was scheduled for the end of 1983, but supplementary experiments related to geomechanics and mining capabilities and to be performed during the construction phase of the experimental facility delayed the completion of the underground facility. During the construction, a continuous observation was made of the behaviour of the clay mass and the structures. In this final contract-report, only the as-built structure, the time schedule and the ''in situ'' experiments launched or performed during the construction phase are dealt with

  10. Research on prognostics and health management of underground pipeline

    Science.gov (United States)

    Zhang, Guangdi; Yang, Meng; Yang, Fan; Ni, Na

    2018-04-01

    With the development of the city, the construction of the underground pipeline is more and more complex, which has relation to the safety and normal operation of the city, known as "the lifeline of the city". First of all, this paper introduces the principle of PHM (Prognostics and Health Management) technology, then proposed for fault diagnosis, prognostics and health management in view of underground pipeline, make a diagnosis and prognostics for the faults appearing in the operation of the underground pipeline, and then make a health assessment of the whole underground pipe network in order to ensure the operation of the pipeline safely. Finally, summarize and prospect the future research direction.

  11. KAERI Underground Research Facility (KURF) for the Demonstration of HLW Disposal Technology

    International Nuclear Information System (INIS)

    Hahn, P. S.; Cho, W. J.; Kwon, S.

    2006-01-01

    In order to dispose of high-level radioactive waste(HLW) safely in geological formations, it is necessary to assess the feasibility, safety, appropriateness, and stability of the disposal concept at an underground research site, which is constructed in the same geological formation as the host rock. In this paper, the current status of the conceptual design and the construction of a small scale URL, which is named as KURF, were described. To confirm the validity of the conceptual design of the underground facility, a geological survey including a seismic refraction survey, an electronic resistivity survey, a borehole drilling, and in situ and laboratory tests had been carried out. Based on the site characterization results, it was possible to effectively design the KURF. The construction of the KURF was started in May 2005 and the access tunnel was successfully completed in March 2006. Now the construction of the research modules is under way

  12. 30 CFR 75.1903 - Underground diesel fuel storage facilities and areas; construction and safety precautions.

    Science.gov (United States)

    2010-07-01

    ... areas; construction and safety precautions. 75.1903 Section 75.1903 Mineral Resources MINE SAFETY AND...; construction and safety precautions. (a) Permanent underground diesel fuel storage facilities must be— (1... with at least 240 pounds of rock dust and provided with two portable multipurpose dry chemical type...

  13. Study on systemizing technology on investigation and analysis of deep underground geological environment. Japanese fiscal year, 2007 (Contract research)

    International Nuclear Information System (INIS)

    Kojima, Keiji; Ohnishi, Yuzo; Aoki, Kenji; Watanabe, Kunio; Nishigaki, Makoto; Tosaka, Hiroyuki; Shimada, Jun; Tochiyama, Osamu; Yoshida, Hidekazu; Ogata, Nobuhisa; Nishio, Kazuhisa

    2009-03-01

    In this year, the following studies were carried out with the aim of systemizing the technology on the investigation and analysis to understand the deep underground geological environment in relation to the radioactive waste disposal. (1) The study on the research and development (R and D) subjects which turned to the practical investigation and analysis of deep underground geological environment. (2) The study on the advanced technical basis for the investigation and analysis of deep underground geological environment. The results obtained from the studies are as follows: Regarding (1), the specific investigations, measurements and numerical and chemical analyses were performed particularly for research subjects: 1) engineering technology and 2) geological environment. Based on the results on (1), 3) tasks of collaboration research on intermediate area between the research fields, including the safety assessment field, were selected. Also redefinition of the NFC (Near Field Concept) were discussed. Regarding (2), based on the extracted tasks of JAEA (Japan Atomic Energy Agency) research project, the study was implemented considering previous R and D results and detailed research at the research field was carried out. This study contributed to the R and D development for its practical application. Concurrently, information exchange and discussion on the 2nd phase (the Construction Phase) of the MIU (Mizunami Underground Research Laboratory) research program were often held. (author)

  14. Incorporating civil-defense shelter space in new underground construction

    International Nuclear Information System (INIS)

    Chester, C.V.

    1981-01-01

    At the present time, the population of the US is approximately ten times more vulnerable to nuclear weapons than the Soviet population. This vulnerability can be reduced rapidly by urban evacuation in a crisis. However, the need to keep the essential economy running in a crisis, as well as coping with attacks on short warning, makes the construction of shelter space where people live very desirable. This can be done most economically by slightly modifying underground construction intended for peacetime use. The designer must consider all elements of the emergency environment when designing the space. Provisions must be made for emergency egress, light and ventilation (without elecric power), blast closures, water, sanitation, and food. The option of upgrading the space in a crisis should be considered. An example is given

  15. Horonobe Underground Research Laboratory project. Investigation program for the 2008 fiscal year

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sanada, Hiroyuki; Yamaguchi, Takehiro; Sugita, Yutaka

    2008-09-01

    As part of the research and development program on geological disposal of high-level radioactive waste (HLW), the Horonobe Underground Research Center, a division of the Japan Atomic Energy Agency (JAEA), is implementing the Horonobe Underground Research Laboratory Project (Horonobe URL Project) with the aim at investigating sedimentary rock formations. According to the research plan described in the Midterm Plan of JAEA, geological investigations are to be carried out during the drilling of a shaft down to intermediate depth, while research and development in the areas of engineering technology and safety assessment are to be promoted by collaboration with other research organizations. The results of the R and D activities will be systematized as a 'knowledge base' that supports a wide range of arguments related to the safety of geological disposal. The Horonobe URL Project is planned to extend over a period of 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the investigation program for the 2008 fiscal year (2008/2009), the 4th year of the Phase 2 investigations. In the 2008 fiscal year, investigations in geoscientific research', including 'development of techniques for investigating the geological environment', 'development of techniques for long-term monitoring of the geological environment', 'development of engineering techniques for use in the deep underground environment' and studies on the long-term stability of the geological environment', are continuously carried out. Investigations in 'research and development on geological disposal technology', including 'improving the reliability of disposal technologies' and 'enhancement of safety assessment methodologies', are also continuously carried out

  16. Study on engineering technologies in the Mizunami Underground Research Laboratory. FY 2014. Development of recovery and mitigation technology on excavation damage (Contract research)

    International Nuclear Information System (INIS)

    Fukaya, Masaaki; Hata, Koji; Akiyoshi, Kenji; Sato, Shin; Takeda, Nobufumi; Miura, Norihiko; Uyama, Masao; Kanata, Tsutomu; Ueda, Tadashi; Hara, Akira; Torisu, Seda; Ishida, Tomoko; Sato, Toshinori; Mikake, Shinichiro; Aoyagi, Yoshiaki

    2016-03-01

    The researches on engineering technology in the Mizunami Underground Research Laboratory (MIU) project consist of (1) development of design and construction planning technologies, (2) development of construction technology, (3) development of countermeasure technology, (4) development of technology for security and (5) development of technologies for restoration and/or reduction of the excavation damage. As a part of the second phase of the MIU project, research has been focused on the evaluation of engineering technologies including the initial design based on the data obtained during construction. In this research, examination of the plug applied to the future reflood test was conducted as a part of (5) development of technologies for restoration and/or reduction of the excavation damage relating to the engineering technology in the MIU (2014), specifically focused on (1) plug examination (e.g. functions, structure and material) and the quality control methods and (2) analytical evaluation of rock mass behavior around the plug through the reflood test. As a result, specifications of the plug were determined. These specifications should be able to meet requirements for the safety structure and surrounding rock mass against predicted maximum water pressure, temperature stress and seismic force, and for controlling the groundwater inflow, ensuring the access into the reflood gallery and the penetration performance of measurement cable. Also preliminary knowledge regarding the rock mass behavior around the plug after flooding the reflood gallery by installed plug was obtained. A CD-ROM is attached as an appendix. (J.P.N.)

  17. Concept of underground nuclear power plant

    International Nuclear Information System (INIS)

    Onishi, Sotoaki

    1976-01-01

    The concept of constructing nuclear power plants on the sea or underground as the future sitting is based on moving the present power plants on the ground with actual results to the sea or underground without changing the design. The underground nuclear power plants have many similar points to underground hydro-electric power stations with many achievements in the construction viewpoint, though they have their proper difficult problems. Of course, it requires to excavate larger underground caves than the case of underground hydro-electric power plants. The maximum dimensions of the caves have been determined through experience in practice. Therefore the developments of design theory and construction technique are desirable in this field. In discussing underground construction, two evaluating methods are considered for the shielding effect of base rocks. The minimum vertical distance up to ground surface from the center of the cave differs depending upon the in-cave pressure, and the conditions of base rock, soil and underground water in case of the accident assumed in the design, and is approximately 60m, if the cave is assumed to be an indefinite cylindrical shape, by the safer side calculation in the above two evaluations. (Wakatsuki, Y.)

  18. Cigeo. The French deep geological repository for radioactive waste. Excavation techniques and technologies tested in underground laboratory and forecasted for the future construction of the project

    International Nuclear Information System (INIS)

    Chauvet, Francois; Bosgiraud, Jean-Michel

    2015-01-01

    Cigeo is the French project for the repository of the high activity and intermediate long-lived radioactive waste. It will be situated at a depth of 500 m, In a clayish rock formation. An underground laboratory was built in the year 2000 and numerous tests are performed since 15 years, in order to know in detail the behavior of the rock and its ability to confine radioactive elements. In addition, this underground laboratory has brought and will continue to bring many lessons on the excavation methods to be chosen for the construction of Cigeo.

  19. Radioisotopic methods for quality control of works and studies while constructing foundations and underground structures

    International Nuclear Information System (INIS)

    Smorodinov, M.I.

    1980-01-01

    The data on the use of radioisotope methods of quality control of various kinds of construction works when building foundations and underground constructions and when carrying out scientific research, are presented. Devices and equipment are described, their block diagrams are presented. The experience in using radioisotope devices to control the quality of construction works, is presented. The problems of economic effectivenes of works using radioisotope devices are solved

  20. Systems management support for ERCDC study of undergrounding and berm containment. Interim report. Preliminary program assessment and follow-on program development

    Energy Technology Data Exchange (ETDEWEB)

    1977-08-01

    Interim results of a study being conducted with respect to the technological aspects of the costs and benefits of underground nuclear power plant construction in direct support of the California Energy Commission's legislative mandate in this area are presented. The program was directed towards problem scoping, methodology evaluation, program definition and planning for subsequent, more detailed investigations of underground facility designs and their potential advantages and disadvantages. The material presented describes the results of (a) systems analyses which were conducted to determine logical requirements for determination of those elements of a nuclear power plant which should be constructed underground; (b) bounding estimates of incremental plant costs for a variety of underground concepts; (c) applicable prior experience in underground facility design and construction which could be used to identify potential sources of strength and weaknessees of underground nuclear power plants; (d) estimates of seismic environments for underground construction in California; (e) preliminary descriptions of underground reactor accident scenarios; (f) bounding estimates of the consequences of such accidents, in terms of comparisons of relative emissions of radioactivity with respect to similar accidents for surface-sited nuclear power plants and (g) results of analyses of several other important technological aspects of the problem. A description is also provided of the program development work performed to provide planning and criteria for subsequent investigations to determine: (a) definitive underground nuclear power plant designs and costs, and (b) estimates of accident consequences in underground nuclear power plants.

  1. Systems management support for ERCDC study of undergrounding and berm containment. Interim report. Preliminary program assessment and follow-on program development

    International Nuclear Information System (INIS)

    1977-08-01

    Interim results of a study being conducted with respect to the technological aspects of the costs and benefits of underground nuclear power plant construction in direct support of the California Energy Commission's legislative mandate in this area are presented. The program was directed towards problem scoping, methodology evaluation, program definition and planning for subsequent, more detailed investigations of underground facility designs and their potential advantages and disadvantages. The material presented describes the results of (a) systems analyses which were conducted to determine logical requirements for determination of those elements of a nuclear power plant which should be constructed underground; (b) bounding estimates of incremental plant costs for a variety of underground concepts; (c) applicable prior experience in underground facility design and construction which could be used to identify potential sources of strength and weaknessees of underground nuclear power plants; (d) estimates of seismic environments for underground construction in California; (e) preliminary descriptions of underground reactor accident scenarios; (f) bounding estimates of the consequences of such accidents, in terms of comparisons of relative emissions of radioactivity with respect to similar accidents for surface-sited nuclear power plants and (g) results of analyses of several other important technological aspects of the problem. A description is also provided of the program development work performed to provide planning and criteria for subsequent investigations to determine: (a) definitive underground nuclear power plant designs and costs, and (b) estimates of accident consequences in underground nuclear power plants

  2. Collection of measurement data in 2012 fiscal year at the Horonobe Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Inagaki, Daisuke

    2014-03-01

    The Horonobe Underground Research Laboratory (URL) Project has being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The URL project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal Technologies', and proceeds in three overlapping phases, 'Phase I: Surface-based investigations', 'Phase II: Investigations during tunnel excavation' and 'Phase III: Investigations in the underground facilities', over a period of around 20 years. The Phase I geoscientific research was carried out from March 2001 to March 2006 in parallel with design and execution scheme on URL facilities. In addition, identifying key issues that need to be addressed in the Phase II/III investigations was planned. At the begining of the Phase II investigations, an investigation report titled 'Measurement Plan and Observational Construction Program on Shaft Excavation at the Horonobe Underground Research Laboratory Project' (hereinafter referred to as 'Observational Construction Program') and an investigation report titled 'Measurement Plan and Observational Construction Program on Drift Excavation at the Horonobe Underground Research Laboratory Project' were published. The Observational Construction Program summarizes the followings from the results of the Phase I investigations: measurements for safety and reasonable constructions, enhancement of shaft design and construction technologies and evaluation of appropriateness for the deep geological environment model estimated before shaft excavation. This report summarizes the measurements data acquired at the Ventilation Shaft, the East Shaft and the drifts in 2012 fiscal year based on the Observational Construction Program. The report summarizes the measurements data for the purpose of acquisition of the basic data

  3. Mizunami Underground Research Project annual report in the 2002 fiscal year

    International Nuclear Information System (INIS)

    Ota, Kunio; Amano, Kenji; Kumazaki, Naoki

    2003-07-01

    The current geoscientific research of the Mizunami Underground Research Laboratory (MIU) Project have been carried out since the 1996 fiscal year at the Shobasama site in Akeyo-cho, Mizunami City, Gifu Prefecture. The main goals of the MIU Project are to establish appropriate methodologies for reliably investigating and assessing a deep subsurface, and to develop a range of engineering techniques for deep underground application in granite. This site for MIU construction was changed in January 2002, from the Shobasama site to city-owned land (MIU Construction Site) after lease contract with Mizunami city. The surface-based investigations at the MIU Construction site have started since February 2002. In 2002 fiscal year, geophysical survey and shallow borehole investigations were conducted and deep borehole investigations have started for modeling and characterization of geological environment in the MIU Construction Site before sinking the shafts. Detail of study and survey during the construction phase of MIU project was planned based on the layout and plan of construction of the underground facilities as one of the results of development of engineering technologies in a deep underground. In the Shobasama site, VSP survey was carried out to improve the model of geological environment. Hydrogeological model was calibrated using the results of long-term pumping test and long-term subsurface and groundwater monitoring. Important factors for hydrogeological modeling were evaluated as the results of numerical analysis by multiple approaches of groundwater flow modeling. The preliminary analysis based on the rock mechanical model at the Shobasama site was performed to estimate the deformation caused by excavation of the underground facilities. (author)

  4. Clean coal technology - Study on the pilot project experiment of underground coal gasification

    International Nuclear Information System (INIS)

    Yang Lanhe; Liang Jie; Yu Li

    2003-01-01

    In this paper, the gasification conditions, the gasifier structure, the measuring system and the gasification rationale of a pilot project experiment of underground coal gasification (UCG) in the Liuzhuang Colliery, Tangshan, are illustrated. The technique of two-phase underground coal gasification is proposed. The detection of the moving speed and the length of the gasification working face is made using radon probing technology. An analysis of the experiment results indicates that the output of air gas is 3000 m 3 /h with a heating value of about 4.18 MJ/m 3 , while the output of water gas is 2000 m 3 /h with a heating value of over 11.00 MJ/m 3 , of which H 2 content is above 40% with a maximum of 71.68%. The cyclical time of two-phase underground gasification is 16 h, with 8 h for each phase. This prolongs the time when the high-heating value gas is produced. The moving speed of the gasification working face in two alternative gasifiers is identified, i.e. 0.204 and 0.487 m/d, respectively. The success of the pilot project experiment of the underground gasification reveals the strides that have been made toward the commercialization of the UCG in China. It also further justifies the reasonability and feasibility of the new technology of long channel, big section, two-phase underground gasification. A conclusion is also drawn that the technology of the pilot project experiment can be popularized in old and discarded coal mines

  5. Reliability assessment of underground shaft closure

    International Nuclear Information System (INIS)

    Fossum, A.F.; Munson, D.E.

    1994-01-01

    The intent of the WIPP, being constructed in the bedded geologic salt deposits of Southeastern New Mexico, is to provide the technological basis for the safe disposal of radioactive Transuranic (TRU) wastes generated by the defense programs of the United States. In determining this technological basis, advanced reliability and structural analysis techniques are used to determine the probability of time-to-closure of a hypothetical underground shaft located in an argillaceous salt formation and filled with compacted crushed salt. Before being filled with crushed salt for sealing, the shaft provides access to an underground facility. Reliable closure of the shaft depends upon the sealing of the shaft through creep closure and recompaction of crushed backfill. Appropriate methods are demonstrated to calculate cumulative distribution functions of the closure based on laboratory determined random variable uncertainty in salt creep properties

  6. Diesel aftertreatment control technologies in underground mines : the NO{sub 2} issue

    Energy Technology Data Exchange (ETDEWEB)

    Cauda, E.G.; Bugarski, A.D.; Patts, L. [National Inst. for Occupational Safety and Health, Pittsburgh, PA (United States). Office of Mine Safety and Health Research

    2010-07-01

    Diesel engines are the main source of exposure for underground miners to nitric oxide (NO) and nitrogen dioxide (NO{sub 2}). The exposure of underground miners to both these pollutants is regulated by the Mine Safety and Health Administration. Improvements have been made in mine ventilation in an attempt to meet more stringent emission limits. In coal mines in the United States, the exposure limits of underground miners to pollutant concentrations determine the ventilation rate specific for certified diesel engines. The ventilation rates are based on the amount of fresh air needed to dilute CO, CO{sub 2}, NO, NO{sub 2} in the undiluted exhaust gas to the threshold limit values (TLV). This presentation described the other options available to mine operators to reduce diesel particulate matter emissions. More advanced engine technologies, aftertreatment control strategies and the use of biodiesel fuels can reduce the mass concentrations of diesel particulate matter (DPM). However, these strategies can also alter tailpipe emissions of NO{sub 2} and an increase in ventilation rate may be required if the concentration of NO{sub 2} exceeds the regulatory enforced limit. The effects of different exhaust aftertreatment technologies were reviewed in this presentation along with ventilation control strategies for underground mining. 43 refs., 3 figs.

  7. Horonobe Underground Research Laboratory project. Investigation report for the 2010 fiscal year

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sawada, Sumiyuki; Sugita, Yutaka

    2011-09-01

    The Horonobe Underground Research Laboratory Project is planned to extend over a period 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction Phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the results of the investigations for the 2010 fiscal year (2010/2011). The investigations, which are composed of 'Geoscientific research' and 'R and D on geological disposal technology', were carried out according to 'Horonobe Underground Research Laboratory Project Investigation Program for the 2010 Fiscal year'. The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. For the sake of this, JAEA has proceeded with the project in collaboration with experts from domestic and overseas research organisations. (author)

  8. Collection of URL measurement data in 2010 fiscal year at the Horonobe Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Inagaki, Daisuke; Sawada, Sumiyuki; Tokiwa, Tetsuya; Tsusaka, Kimikazu; Amano, Yuki; Niinuma, Hiroaki

    2012-09-01

    The Horonobe Underground Research Laboratory (URL) Project has being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The URL project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal Technologies', and proceeds in three overlapping phases, 'Phase I: Surface-based investigations', 'Phase II: Investigations during tunnel excavation' and 'Phase III: Investigations in the underground facilities', over a period of around 20 years. The Phase I geoscientific research was carried out from March 2001 to March 2006 in parallel with design and execution scheme on URL facilities. In addition, identifying key issues that need to be addressed in the Phase II/III investigations was planned. At the begining of the Phase II investigations, an investigation report titled 'Measurement Plan and Observational Construction Program on Shaft Excavation at the Horonobe Underground Research Laboratory Project' (hereinafter referred to as 'Observational Construction Program') and an investigation report titled 'Measurement Plan and Observational Construction Program on Drift Excavation at the Horonobe Underground Research Laboratory Project' were published. The Observational Construction Program summarizes the followings from the results of the Phase I investigations: measurements for safety and reasonable constructions, enhancement of shaft design and construction technologies and evaluation of appropriateness for the deep geological environment model estimated before shaft excavation. This report summarizes the measurements data acquired at the Ventilation Shaft, the East Shaft and the drifts in 2010 fiscal year based on the Observational Construction Program. The report summarizes the measurements data for the purpose of acquisition the basic data for

  9. Collection of URL measurement data in 2011 fiscal year at the Horonobe Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Inagaki, Daisuke; Tokiwa, Tetsuya; Murakami, Hiroaki

    2013-02-01

    The Horonobe Underground Research Laboratory (URL) Project has being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The URL project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal Technologies', and proceeds in three overlapping phases, 'Phase I: Surface-based investigations', 'Phase II: Investigations during tunnel excavation' and 'Phase III: Investigations in the underground facilities', over a period of around 20 years. The Phase I geoscientific research was carried out from March 2001 to March 2006 in parallel with design and execution scheme on URL facilities. In addition, identifying key issues that need to be addressed in the Phase II/III investigations was planned. At the beginning of the Phase II investigations, an investigation report titled 'Measurement Plan and Observational Construction Program on Shaft Excavation at the Horonobe Underground Research Laboratory Project' (hereinafter referred to as 'Observational Construction Program') and an investigation report titled 'Measurement Plan and Observational Construction Program on Drift Excavation at the Horonobe Underground Research Laboratory Project' were published. The Observational Construction Program summarizes the followings from the results of the Phase I investigations: measurements for safety and reasonable constructions, enhancement of shaft design and construction technologies and evaluation of appropriateness for the deep geological environment model estimated before shaft excavation. This report summarizes the measurements data acquired at the Ventilation Shaft, the East Shaft and the drifts in 2011 fiscal year based on the Observational Construction Program. The report summarizes the measurements data for the purpose of acquisition the basic data for

  10. Advancing the US Department of Energy's Technologies through the Underground Storage Tank: Integrated Demonstration Program

    International Nuclear Information System (INIS)

    Gates, T.E.

    1993-01-01

    The principal objective of the Underground Storage Tank -- Integrated Demonstration Program is the demonstration and continued development of technologies suitable for the remediation of waste stored in underground storage tanks. The Underground Storage Tank Integrated Demonstration Program is the most complex of the integrated demonstration programs established under the management of the Office of Technology Development. The Program has the following five participating sites: Oak Ridge, Idaho, Fernald, Savannah River, and Hanford. Activities included within the Underground Storage Tank -- Integrated Demonstration are (1) characterizating radioactive and hazardous waste constituents, (2) determining the need and methodology for improving the stability of the waste form, (3) determining the performance requirements, (4) demonstrating barrier performance by instrumented field tests, natural analog studies, and modeling, (5) determining the need and method for destroying and stabilizing hazardous waste constituents, (6) developing and evaluating methods for retrieving, processing (pretreatment and treatment), and storing the waste on an interim basis, and (7) defining and evaluating waste packages, transportation options, and ultimate closure techniques including site restoration. The eventual objective is the transfer of new technologies as a system to full-scale remediation at the US Department of Energy complexes and sites in the private sector

  11. Horonobe Underground Research Laboratory project investigation report for the 2008 fiscal year

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sano, Michiaki; Sanada, Hiroyuki; Sugita, Yutaka

    2009-11-01

    The Horonobe Underground Research Laboratory Project is planned to extend over a period 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations' 'Phase 2: Construction Phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the results of the investigations for the 2008 fiscal year (2008/2009), the 4th year of the Phase 2 investigations. The investigations, which are composed of 'Geoscientific research' and 'R and D on geological disposal technology', were carried out according to 'Horonobe Underground Research Laboratory Project Investigation Program for the 2008 Fiscal year'. The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. For the sake of this, JAEA has proceeded with the project in collaboration with experts from domestic and overseas research organisations. (author)

  12. Development of support system for large-scale underground structures using WEB 3D technology and RDBMS

    International Nuclear Information System (INIS)

    Xu, Zhaofeng; Itakura, Ken-ichi; Yamachi, Hiroshi; Sato, Toshinori; Matsui, Hiroya

    2015-01-01

    In the process of underground space development, enormous information is collected in each developing stage, such as investigation, plan, design and construction. It is important to properly feed back these information to design and construction in order to realize rational design and construction of an underground space. And more, these information also become basic data in a plane of structure management. However, it is almost impossible that it is controlled in the individual ability, since collected information quantity is too enormous. For the purpose of intuitively controlling and processing these enormous information, we devised the system for the data management by freely moving in virtual reality space. In this paper, the basic structure of the system constructed by adopting WEB 3D and RDBMS, is described, and the practicability is verified. (author)

  13. A review of construction techniques available for surface and underground radioactive waste repositories

    International Nuclear Information System (INIS)

    Godfrey, D.G.; Davies, I.L.; MacKenzie, R.D.

    1985-01-01

    In terms of engineering requirements the construction of surface or indeed underground radioactive waste repositories is not unduly difficult. The civil engineering techniques likely to be required have generally been carried out previously, albeit not in the context of radioactive waste repositories in this country. The emphasis will have to be very much on the quality of construction. This paper emphasises the need for quality construction and describes the techniques likely to be used in the construction of repositories. Reference is made to the materials likely to be used in the construction of repositories and also to the need for being able to convince the designers, regulating authorities and the general public that the materials used will indeed last for the required time. Brief reference is made at the end of the paper to the civil engineering parameters requiring consideration in the location of repository siting. (author)

  14. Assessment of the underground construction details of a road pavement using GPR antenna systems with different frequencies

    Science.gov (United States)

    Alani, Amir M.; Tosti, Fabio; Bianchini Ciampoli, Luca; Benedetto, Francesco; Benedetto, Andrea

    2017-04-01

    The assessment of the underground construction details of a road infrastructure is a problem of great concern in highway engineering. The case becomes complicated especially when damages reoccur after carrying out remedial surface maintenance and repair works over the life cycle of the infrastructure. The challenge will be exacerbated at the presence of underground watercourses, such that the geotechnical stability of the entire road structure could be threatened. In this respect, ground-penetrating radar (GPR) has been recognised and accepted as one of the most effective non-destructive testing (NDT) techniques that could be employed in identifying the cause/s of such problems. The recent advancements and developments made in the field of GPR hardware as well as the current level of understanding of the applications and processing techniques of the GPR data have immensely added to the reliability in the utilisation of this tool in variety of subsurface investigation projects. In view of this, the work presented in here focuses on the assessment of the underground construction details of a road pavement using different frequency GPR antenna systems. In addition to this, the possible presence and location of an underground watercourse was investigated in this work. The existence of the latter problem was perceived due to reoccurrence of longitudinal and traversal road surface cracking as well as subsidence at a particular location of the road. Reoccurrence of this damage was interpreted and related to the possible existence of an underground watercourse. The original design and the construction of the road were as such to prevent this movement. Therefore it seemed necessary to perform a GPR survey to investigate and confirm the underground construction details of the road. To this purpose, the identified area was surveyed using high to low frequency antennas with 2000 MHz, 900 MHz, 600 MHz and 200 MHz central frequencies of investigation. Scans were performed at 1m

  15. Introductory study of super survey (next generation underground exploration technology); Super survey (jisedai chika tansa gijutsu) no sendo kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    An investigational study was conducted on the R and D trend of innovative technology aiming at high-accuracy/high-efficiency next generation underground exploration technology (super survey technology). Paying attention to the seismic survey and electromagnetic survey, the study was made on technical characteristics, the utilization status and the needs at sites, the R and D trend, etc. As to the present R and D, the development is proceeded with of the time domain method in the electromagnetic survey, the effective quantity data processing/analysis method and the indication method using the reflection method in the elastic survey. As new technology to be noticed, the following are cited: SQUID magnetometer, underground analysis using magnetic deviation data, electromagnetic migration, ACROSS, rotating seismometer, laser Doppler vibrator, etc. Concerning the course of the next generation underground survey technology, a system of the integrated underground exploration theory is considered which is based on a combination of the electromagnetic survey and seismic exploration. In the study, a plan is worked out for research/development of a technology of analyzing the different data obtained. 49 figs., 13 tabs.

  16. Simulation of Daylighting Conditions in a Virtual Underground City

    Directory of Open Access Journals (Sweden)

    Cristiano Merli Alcini

    2015-06-01

    Full Text Available From the Piranesi fantastic architectures to the animation movies and video games of the last thirty years, a new design approach has been introduced and developed: the design of the virtual space. Designing the "virtual" means experiencing a multidisciplinary approach where architecture, engineering, and urban planning meet the new horizons of information and communication technology. This study is focused on virtual space, which is an underground city. Mankind have always made and used underground environments: the possibilities of unlimited spaces to potential development, the reduced needs for raw materials for the construction and the protection from outdoor weather are some of the reasons that prompted humans to the realization of underground spaces in the past. These reasons and the availability of innovative technologies could encourage a breakthrough in the realization of new underground environments. A recent example is represented by the Underground City of Montreal (RÉSO. We present the architectural design of a virtual underground city, which is called Arch[ane], and its evaluation. The underground city is modular and the studied module is composed of eight floors with a total depth of 400 m and dimensions of 800 m × 800 m. The study comprises the evaluation of the effect of sunlight on each eight floors of the city. Daylighting simulations were performed considering different cities at different latitudes, days, and hours. The results have shown that the particular design of the underground city with skylights gives significant values of illuminance at a certain depth. Furthermore, the simulation results show how huge can be the potentialities of software to simulate extremely big environments.

  17. Advantages of co-located spent fuel reprocessing, repository and underground reactor facilities

    International Nuclear Information System (INIS)

    Mahar, James M.; Kunze, Jay F.; Wes Myers, Carl; Loveland, Ryan

    2007-01-01

    The purpose of this work is to extend the discussion of potential advantages of the underground nuclear park (UNP) concept by making specific concept design and cost estimate comparisons for both present Generation III types of reactors and for some of the modular Gen IV or the GNEP modular concept. For the present Gen III types, we propose co-locating reprocessing and (re)fabrication facilities along with disposal facilities in the underground park. The goal is to determine the site costs and facility construction costs of such a complex which incorporates the advantages of a closed fuel cycle, nuclear waste repository, and ultimate decommissioning activities all within the UNP. Modular power generation units are also well-suited for placement underground and have the added advantage of construction using current and future tunnel boring machine technology. (authors)

  18. Horonobe Underground Research Laboratory project investigation program for the 2007 fiscal year (Translated document)

    International Nuclear Information System (INIS)

    Matsui, Hiroya; Nakayama, Masashi; Sanada, Hiroyuki; Yamaguchi, Takehiro

    2008-09-01

    As past of the research and development program on the geological disposal of high-level radioactive waste (HLW), the Horonobe Underground Research Center, a division of the Japan Atomic Energy Agency (JAEA), is implementing the Horonobe Underground Research Laboratory Project (Horonobe URL Project) with the aim at investigating sedimentary rock formations. According to the research plan described in the Midterm Plan of JAEA, geological investigations are to be carried out during the drilling of a shaft down to intermediate depth, while research and development in the areas of engineering technology and safety assessment are to be promoted by collaboration with other research organizations. The results of the R and D activities will be systematized as a 'knowledge base' that supports a wide range of arguments related to the safety of geological disposal. The Horonobe URL Project is planned to extend over a period of 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the investigation program for the 2007 fiscal year (2007/2008), the third year of the Phase 2 investigations. In the 2007 fiscal year, investigations in geoscientific research', including 'development of techniques for investigating the geological environment', 'development of techniques for use in the deep underground environment' and 'studies on the long-term stability of the geological environment', is continuously carried out. Investigations in 'research and development on geological disposal technology', including improving the reliability of disposal technologies' and 'enhancement of safety assessment methodologies' are also continuously carried out. Construction of the underground facilities is ongoing at the Ventilation Shaft and the East Shaft

  19. Mizunami Underground Research Project. Annual report in the 2003 fiscal year

    International Nuclear Information System (INIS)

    Nakama, Shigeo; Takeuchi, Shinji; Amano, Kenji

    2004-12-01

    The current geoscientific research of the Mizunami Underground Research Laboratory (MIU) Project have been carried out since the 1996 fiscal year at the Shobasama Site in Akeyo-cho, Mizunami City, Gifu Prefecture. The main goals of MIU Project are to establish appropriate methodologies for reliably investigation and assessing a deep subsurface, and to develop a range of engineering techniques for deep underground application in granite. The surface-based investigations at city-owned land (MIU Construction Site) have started since the 2001 fiscal year. In 2003 fiscal year, deep borehole investigations were continued in the MIU Construction Site. To understand the state of the deep geological environment before shaft sinking based on these investigations and research, a geological environmental model in/around the MIU Construction Site was constructed. In addition to there groundwater monitoring was carried out using shallow boreholes. As a research on the engineering technology, the review of the design and construction plan of the shafts and galleries and the outbreak event measures and security measures were provided. In Shobasama site, the analysis of an uncertain factor was executed based on the results of the underground water flow analysis. The hydraulic pressure monitoring and surface hydraulic observation were continued. (author)

  20. SOME FEATURES OF THE DESIGN AND CONSTRUCTION OF UNDERGROUND PUBLIC AND SHOPPING CENTRE WITH PARKING IN MINSK

    Directory of Open Access Journals (Sweden)

    V. H. Pastushkov

    2010-03-01

    Full Text Available In the article some features of designing and construction, experimental-and-theoretical researches of structures of the multifunctional underground complex (public shopping center with parking on theIndependencesq. in Minsk are considered.

  1. Collection of measurement data in 2013 fiscal year at the Horonobe Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Aoyagi, Kazuhei; Kawate, Satoshi

    2015-12-01

    The Horonobe Underground Research Laboratory (URL) Project has being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The URL project consists of two major research areas, “Geoscientific Research” and “R and D on Geological Disposal Technologies”, and proceeds in three overlapping phases, “Phase I: Surface-based investigations”, “Phase II: Investigations during tunnel excavation” and “Phase III: Investigations in the underground facilities”, over a period of around 20 years. The Phase I geoscientific research was carried out from March 2001 to March 2006 in parallel with design and execution scheme on URL facilities. In addition, identifying key issues that need to be addressed in the Phase II/III investigations were planned. At the beginning of the Phase II investigations, an investigation report titled “Measurement Plan and Observational Construction Program on Shaft Excavation at the Horonobe Underground Research Laboratory Project” (hereinafter referred to as “Observational Construction Programs”) and an investigation report titled “Measurement Plan and Observational Construction Program on Drift Excavation at the Horonobe Underground Research Laboratory Project” were published. The Observational Construction Program summarizes the followings from the results of the Phase I investigations: measurements for safety and reasonable constructions, enhancement of shaft design and construction technologies and evaluation of appropriateness for the deep geological environment model estimated before shaft excavation. This report summarizes the measurements data acquired at the Ventilation Shaft, the West Shaft and the drifts in 2013 fiscal year for the purpose of the basic data for carrying out the Observational Construction Program. A DVD-ROM is

  2. Siting technology of underground nuclear power station

    International Nuclear Information System (INIS)

    Motojima, M.; Hibino, S.

    1989-01-01

    For the site of a nuclear power station, it may be possible to select a seaside mountain area, if the condition is suitable to excavate large rock caverns in which a reactor and other equipments are installed. As the case study on the siting technology for an underground nuclear power station, the following example was investigated. The site is a seaside steep mountain area, and almost all the equipments are installed in plural tunnel type caverns. The depth from the ground surface to the top of the reactor cavern is about 150 m, and the thickness of the rock pillar between the reactor cavern of 33 m W x 82 mH x 79 mD and the neighboring turbine cavern is 60 m. In this paper, the stability of rock caverns in this example, evaluated by numerical analysis, is described. The numerical analysis was carried out on the central cross section of the reactor cavern, taking the turbine cavern, geostress, the mechanical properties of rock mass and the process of excavation works in consideration. By the analysis, the underground caverns in this example were evaluated as stable, if the rock quality is equivalent to C H class or better according to the CRIEPI rock classification. (K.I.)

  3. Recovery of oil from underground drill sites

    International Nuclear Information System (INIS)

    Streeter, W.S.; Hutchinson, T.S.; Ameri, S.; Wasson, J.A.; Aminian, K.

    1991-01-01

    This paper reports that a significant quantity of oil is left in reservoirs after conventional oil recovery techniques have been applied. In West Virginia and Pennsylvania alone, this oil has been estimated at over 4.5 billion barrels (0.72 billion m 3 ). Conventional recovery methods are already being used when applicable. But a new recovery method is needed for use in reservoirs that have been abandoned. One alternative method for recovery of the residual oil is known as oil recovery from underground drill sites. This recovery technology is a combination of proven methods and equipment from the petroleum, mining, and civil construction industries. Underground oil recovery can be an economically viable method of producing oil. This has been shown in producing fields, field tests, and feasibility, studies. Faced with decreasing domestic oil production, the petroleum industry should give serious consideration to the use of oil recovery from underground drill sites as a safe, practical, and environmentally sensitive alternative method of producing oil from many reservoirs

  4. Design and construction work of underground pit for existing light oil tank foundation at Onagawa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kikuchi, Keita; Date, Masanao; Horimi, Shingo

    2017-01-01

    Based on the new regulatory standards for commercial power plant reactors enforced in July 2013, Onagawa Nuclear Power Station of Tohoku Electric Power Co., Inc. implemented various safety measure works. One of them was a measure for the existing light oil tank foundation for emergency diesel generators for Unit 2 reactor. In consideration of tornado, external fire, and earthquake resistance, the company implemented the underground pit construction for a light oil tank basement by utilizing the existing oil retaining wall and foundation. This paper reported the outline of the planning, design, and implementation of construction works, which were carried out while securing quality and safety. Upon installation of the underground pit, the company utilized the existing oil retaining wall from the viewpoint of reducing construction costs, shortening time schedule, and reducing environmental burden. As a result of checking bending and axial force, part of these values exceeded the design reference values. So, 3-dimensional shell model was applied, and the simulation results showed sufficient seismic margin. As a measure to secure seismic margin against shear force, Ceramic-Cap-bar construction method was adopted. Upon construction, the company adopted the water jet method, and devised the sequential order of construction. In parallel with the day and night work and tank installation, it constructed the top slab, which secured the time schedule and quality. (A.O.)

  5. Underground space planning in Helsinki

    Directory of Open Access Journals (Sweden)

    Ilkka Vähäaho

    2014-10-01

    Full Text Available This paper gives insight into the use of underground space in Helsinki, Finland. The city has an underground master plan (UMP for its whole municipal area, not only for certain parts of the city. Further, the decision-making history of the UMP is described step-by-step. Some examples of underground space use in other cities are also given. The focus of this paper is on the sustainability issues related to urban underground space use, including its contribution to an environmentally sustainable and aesthetically acceptable landscape, anticipated structural longevity and maintaining the opportunity for urban development by future generations. Underground planning enhances overall safety and economy efficiency. The need for underground space use in city areas has grown rapidly since the 21st century; at the same time, the necessity to control construction work has also increased. The UMP of Helsinki reserves designated space for public and private utilities in various underground areas of bedrock over the long term. The plan also provides the framework for managing and controlling the city's underground construction work and allows suitable locations to be allocated for underground facilities. Tampere, the third most populated city in Finland and the biggest inland city in the Nordic countries, is also a good example of a city that is taking steps to utilise underground resources. Oulu, the capital city of northern Finland, has also started to ‘go underground’. An example of the possibility to combine two cities by an 80-km subsea tunnel is also discussed. A new fixed link would generate huge potential for the capital areas of Finland and Estonia to become a real Helsinki-Tallinn twin city.

  6. Construction and modernization of underground and surface mines. [USSR

    Energy Technology Data Exchange (ETDEWEB)

    Burshtein, N M

    1983-12-01

    Development of the Sredazugol' association in Soviet Central Asia from 1976 to 1985 is discussed. From 1976 to 1980 investment in the association amounted to 151 million rubles, 87.5 million of which fell on construction. Major development projects of the 1976-1980 period are reviewed: construction of new mining levels in underground coal mines, development of a number of operating surface mines, modernization of earthmoving and mining equipment, development of mine haulage by locomotives and railroad cars, improving occupational safety in coal mining, increasing slope stability in surface mining, especially in the area of the Atchinsk landslide in the Angren mine. From 1981 to 1985 investment in the Sredazugol' association should amount to 202 million rubles, of which 126 million rubles will be spent on construction. Investment will be 35% higher than in the 1976-1980 period and investment in mine construction 43% higher. The largest development project will be modernization of the Angren surface mine and increasing its targeted coal output from 5.2 Mt/y to 10.3 Mt/y by 1990. Modernization and reconstruction of the Angren mine will be carried out in 2 stages. Coal output of the mine will increase by 1.2 Mt/y in the current 5 year plan (by 1985), and by 3.9 Mt/y in the next 5 year period. Reconstruction and development of the Angren mine will cost approximately 254 million rubles. Mining and earthmoving equipment which will be used in the Angren mine is reviewed: EhRGV-630 bucket wheel excavators, EhSh-10/70 and EhSh-13/50 walking draglines, etc.

  7. Underground nuclear power plant

    International Nuclear Information System (INIS)

    Takahashi, Hideo.

    1997-01-01

    In an underground-type nuclear power plant, groups of containing cavities comprising a plurality of containing cavities connected in series laterally by way of partition walls are disposed in parallel underground. Controlled communication tunnels for communicating the containing cavities belonging to a control region to each other, and non-controlled communication tunnels for communicating containing cavities belonging to a non-controlled area to each other are disposed underground. A controlled corridor tunnel and a non-controlled corridor tunnel extended so as to surround the containing cavity groups are disposed underground, and the containing cavities belonging to the controlled area are connected to the controlled corridor tunnel respectively, and the containing cavities belonging to the non-controlled area are connected to the non-controlled corridor tunnel respectively. The excavating amount of earth and sand upon construction can be reduced by disposing the containing cavity groups comprising a plurality of containing cavities connected in series laterally. The time and the cost for the construction can be reduced, and various excellent effects can be provided. (N.H.)

  8. Collection of measurement data in 2014 fiscal year at the Horonobe Underground Research Laboratory Project

    International Nuclear Information System (INIS)

    Sakurai, Akitaka; Aoyagi, Kazuhei

    2016-07-01

    The Horonobe Underground Research Laboratory (URL) Project has being pursued by Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The URL project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal Technologies', and proceeds in three overlapping phases, 'Phase I: Surface-based investigations', 'Phase II: Investigations during tunnel excavation' and 'Phase III: Investigations in the underground facilities', over a period of around 20 years. The Phase I geoscientific research was carried out from March 2001 to March 2006 in parallel with design and execution scheme on URL facilities. In addition, identifying key issues that need to be addressed in the Phase II/III investigations were planned. At the beginning of the Phase II investigations, investigation reports related to measurement plan and observational construction program on shaft and drift excavation were published. The observational construction program summarizes the followings from the results of the Phase I investigations: measurements for safety and reasonable constructions, enhancement of shaft design and construction technologies and evaluation of appropriateness for the deep geological environment model estimated before shaft excavation. Currently, Phase III investigation related to geological disposal in underground facilities has been conducting. Also, measurement for consideration of long-term stability of the tunnel has been continued. This report summarizes the measurements data acquired at the West Shaft in 2014 fiscal year for the purpose of the basic data for carrying out the Observational Construction Program. A DVD-ROM is attached as an appendix. (J.P.N.)

  9. Final report on the surface-based investigation (phase 1) at the Mizunami Underground Laboratory project

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Seno, Yasuhiro; Nakama, Shigeo; Tsuruta, Tadahiko; Amano, Kenji; Takeuchi, Ryuji; Matsuoka, Toshiyuki; Onoe, Hironori; Mizuno, Takashi; Ohyama, Takuya; Hama, Katsuhiro; Sato, Toshinori; Kuji, Masayoshi; Kuroda, Hidetaka; Semba, Takeshi; Uchida, Masahiro; Sugihara, Kozo; Sakamaki, Masanori; Iwatsuki, Teruki

    2007-03-01

    investigation to assessment was compiled as a set of geosynthesis data flow diagram for each investigation step. With regard to the overall project goals 2), 'To formulate detailed design concepts and a construction plan for the underground facilities,' an optimal design of MIU was completed with the aim to provide a foundation for engineering technologies in deep underground to safely construct and operate an underground facility which will be built for the purpose of acquiring data and demonstrating disposal technologies. Thus, this report summarizes geosynthesis procedures to investigate and assess the crystalline rock, and development of individual investigation and assessment methods. At the same time, technical findings and know-how which can serve as foundation to disposal business were compiled. Also, this report clarified the necessity for the Phase II and Phase III investigation by compiling unresolved issues during the Phase I investigation. The results described in this report will be utilized as technical knowledge of disposal technology and effectively used to enhance technical foundation which will support disposal business and safety regulations. (author)

  10. Advanced remediation, technology development in the underground storage tank

    International Nuclear Information System (INIS)

    Gates, T.E.; Gilchrist, R.L.

    1992-01-01

    Production of nuclear materials has been a major mission of the U. S. Department of Energy (DOE) over the last 50 years. These activities have contributed to a substantial accumulation of hazardous, radioactive, and mixed wastes. In 1989, the DOE established the Office of Environmental Restoration and Waste Management. This office coordinates and manages the DOE's remediation, waste minimization, and environmental compliance activities. It also has responsibility for waste generated by current operations. Within this office is the Office of Technology Development, which is responsible for providing technology improvements. This paper reports on integrated demonstrations which have been established to efficiently bring the best technologies to bear on the common needs of multiple DOE sites. One such need is resolution of the actions required for final closure and waste disposal of liquid (including sludge and salt cake) radioactive and chemical wastes that have been transferred to underground storage tanks

  11. The planning of future research program of underground laboratories in overseas

    International Nuclear Information System (INIS)

    Honma, Nobuyuki; Tanai, Kenji; Hasegawa, Hiroshi

    2002-02-01

    The objectives of this study is to identify the research issues, which are to be conducted in the future underground research laboratory, about operation and logistics systems for the planning of future research and development program. The research programs and experiments, etc. were investigated for the geological disposal projects in overseas sedimentary rocks and coastal geological environments aiming to reflect in the future underground research facility plan in Japan. In the investigation, information on the engineered-barrier performance, design and construction of underground facilities, tunnel support, transportation and emplacement, and backfilling technology, etc. were collected. Based on these informations, the purpose, the content, and the result of each investigations and tests were arranged. The strategy and the aim in the entire underground research facility, and the flow of investigations and tests, etc. were also arranged from the purpose, the relations and the sequence of each investigation and experiment, and the usage of results, etc. (author)

  12. Design study of underground facility of the Underground Research Laboratory

    International Nuclear Information System (INIS)

    Hibiya, Keisuke; Akiyoshi, Kenji; Ishizuka, Mineo; Anezaki, Susumu

    1998-03-01

    Geoscientific research program to study deep geological environment has been performed by Power Reactor and Nuclear Fuel Development Corporation (PNC). This research is supported by 'Long-Term Program for Research, Development and Utilization of Nuclear Energy'. An Underground Research Laboratory is planned to be constructed at Shoma-sama Hora in the research area belonging to PNC. A wide range of geoscientific research and development activities which have been previously studied at the Tono Area is planned in the laboratory. The Underground Research Laboratory is consisted of Surface Laboratory and Underground Research Facility located from the surface down to depth between several hundreds and 1,000 meters. Based on the results of design study in last year, the design study performed in this year is to investigate the followings in advance of studies for basic design and practical design: concept, design procedure, design flow and total layout. As a study for the concept of the underground facility, items required for the facility are investigated and factors to design the primary form of the underground facility are extracted. Continuously, design methods for the vault and the underground facility are summarized. Furthermore, design procedures of the extracted factors are summarized and total layout is studied considering the results to be obtained from the laboratory. (author)

  13. A review of international underground laboratory developments

    International Nuclear Information System (INIS)

    Cheng Jianping; Yue Qian; Wu Shiyong; Shen Manbin

    2011-01-01

    Underground laboratories are essential for various important physics areas such as the search for dark matter, double beta decay, neutrino oscillation, and proton decay. At the same time, they are also a very important location for studying rock mechanics, earth structure evolution,and ecology. It is essential for a nation's basic research capability to construct and develop underground laboratories. In the past, China had no high-quality underground laboratory,in particular no deep underground laboratory,so her scientists could not work independently in major fields such as the search for dark matter,but had to collaborate with foreign scientists and share the space of foreign underground laboratories. In 2009, Tsinghua university collaborated with the Ertan Hydropower Development Company to construct an extremely deep underground laboratory, the first in China and currently the deepest in the world, in the Jinping traffic tunnel which was built to develop hydropower from the Yalong River in Sichuan province. This laboratory is named the China Jinping Underground Laboratory (CJPL) and formally opened on December 12, 2010. It is now a major independent platform in China and can host various leading basic research projects. We present a brief review of the development of various international underground laboratories,and especially describe CJPL in detail. (authors)

  14. Closures for underground nuclear power plants

    International Nuclear Information System (INIS)

    1981-10-01

    This study demonstrates that, with the appropriate selection of an access concept on the underground nuclear power plant, it is possible to design a gate complying with the increased requirements of the construction of an underground nuclear power plant. The investigations revealed that a comparison leakage of 42 mm in diameter for the failure of seals is too conservative. When selecting suitable seals a leakage being more extensive than the above mentioned one can be prevented even in case of disturbance lasting several months. The closure structures of the personnel and material accesses do not represent any weak point within the concept of the construction method for underground nuclear power plants. (orig./HP)

  15. Review of Underground Construction Methods and Opening Stability for Repositories in Clay/Shale Media

    Energy Technology Data Exchange (ETDEWEB)

    Hardin, Ernest [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)

    2014-06-01

    This report reviews the art and practice of excavating and constructing underground facilities in clay/shale media, as part of a multi-year evaluation of the technical feasibility of direct disposal of spent nuclear fuel (SNF) in dual-purpose canisters (DPCs). The purpose is to review worldwide examples of large-scale excavations in clay/shale media, the methods used for excavation and constructi on, and the costs. It is anticipated that this information will help to show the feasibility of construction for a deep geologic respository for (on the order of) 10,000 large, heavy, heat-generating waste packages. This report will refine the clay/shale disposal concept for DPC -based waste packages, in support of future studies that include cost estimation.

  16. A Wireless LAN and Voice Information System for Underground Coal Mine

    Directory of Open Access Journals (Sweden)

    Yu Zhang

    2014-06-01

    Full Text Available In this paper we constructed a wireless information system, and developed a wireless voice communication subsystem based on Wireless Local Area Networks (WLAN for underground coal mine, which employs Voice over IP (VoIP technology and Session Initiation Protocol (SIP to achieve wireless voice dispatching communications. The master control voice dispatching interface and call terminal software are also developed on the WLAN ground server side to manage and implement the voice dispatching communication. A testing system for voice communication was constructed in tunnels of an underground coal mine, which was used to actually test the wireless voice communication subsystem via a network analysis tool, named Clear Sight Analyzer. In tests, the actual flow charts of registration, call establishment and call removal were analyzed by capturing call signaling of SIP terminals, and the key performance indicators were evaluated in coal mine, including average subjective value of voice quality, packet loss rate, delay jitter, disorder packet transmission and end-to- end delay. Experimental results and analysis demonstrate that the wireless voice communication subsystem developed communicates well in underground coal mine environment, achieving the designed function of voice dispatching communication.

  17. Sanford Underground Research Facility - The United State's Deep Underground Research Facility

    Science.gov (United States)

    Vardiman, D.

    2012-12-01

    The 2.5 km deep Sanford Underground Research Facility (SURF) is managed by the South Dakota Science and Technology Authority (SDSTA) at the former Homestake Mine site in Lead, South Dakota. The US Department of Energy currently supports the development of the facility using a phased approach for underground deployment of experiments as they obtain an advanced design stage. The geology of the Sanford Laboratory site has been studied during the 125 years of operations at the Homestake Mine and more recently as part of the preliminary geotechnical site investigations for the NSF's Deep Underground Science and Engineering Laboratory project. The overall geology at DUSEL is a well-defined stratigraphic sequence of schist and phyllites. The three major Proterozoic units encountered in the underground consist of interbedded schist, metasediments, and amphibolite schist which are crosscut by Tertiary rhyolite dikes. Preliminary geotechnical site investigations included drift mapping, borehole drilling, borehole televiewing, in-situ stress analysis, laboratory analysis of core, mapping and laser scanning of new excavations, modeling and analysis of all geotechnical information. The investigation was focused upon the determination if the proposed site rock mass could support the world's largest (66 meter diameter) deep underground excavation. While the DUSEL project has subsequently been significantly modified, these data are still available to provide a baseline of the ground conditions which may be judiciously extrapolated throughout the entire Proterozoic rock assemblage for future excavations. Recommendations for facility instrumentation and monitoring were included in the preliminary design of the DUSEL project design and include; single and multiple point extensometers, tape extensometers and convergence measurements (pins), load cells and pressure cells, smart cables, inclinometers/Tiltmeters, Piezometers, thermistors, seismographs and accelerometers, scanners (laser

  18. A review of factors influencing underground construction quality and the performance of engineered features

    International Nuclear Information System (INIS)

    Talbot, R.; Moy, D.; Breeds, C.D.; Kostelec, C.M.; Emsley, S.J.; Shuttle, D.; Cutler, J.; Hedman, T.; Carlsson, A.

    1992-01-01

    This report describes research to identify and rank the factors that should be considered for an assessment of the radioactive containment capability of repository engineered features. Containment is to be achieved through the use of multiple barriers to radionuclide movement, including the waste, waste container, repository structures and backfill, and repository seals. A review of the literature is used to identify radionuclide mobilisation and transport processes for the anticipated environmental conditions, and to compile a data base of repository design features, functional requirements, and design objectives. For selected design components, the report identifies alternative designs and factors contributing to design, focusing on the requirements for a design process, design specifications, construction requirements, and quality assurance requirements for the both design and construction. Existing practice in large, underground civil construction projects is used as a part of comparison, in conjunction with reported performance assessments, to determine those areas in which the repository developer will need to provide additional data, justification, and documentation prior to construction to ensure that performance requirements can be achieved. (Author)

  19. Measures against concrete cracking in underground type light oil tank pit construction work

    International Nuclear Information System (INIS)

    Koike, Takeo; Kadowaki, Kazuhiko; Date, Masanao

    2017-01-01

    The underground type light oil tank pit set at Onagawa Nuclear Power Station is a tripartite underground pit structure made of reinforced concrete. This is a mass concrete made of deck slab / outer wall of 1.5 m in thickness and inner wall / top slab of 1.0 m in thickness. Since concrete placement season was July for the deck slab and October for the walls, the occurrence of thermal cracking was highly conceivable. As a result of investigating crack suppression measures based on the crack width of 0.2 mm or less as a guide, the application of fly ash cement and the addition of expansion material to the walls were judged effective and adopted. Thanks to these preliminary studies and careful construction control, it was possible to minimize the occurrence of cracks, but several through cracks of 0.2 mm or less were confirmed on part of the outer walls. As a countermeasure, repair by means of surface impregnation method was adopted, and quality and schedule could be secured. This paper outlines crack suppression measures and repair of the cracks that occurred after the implementation. (A.O.)

  20. Underground Politics

    DEFF Research Database (Denmark)

    Galis, Vasilis; Summerton, Jane

    Public spaces are often contested sites involving the political use of sociomaterial arrangements to check, control and filter the flow of people (see Virilio 1977, 1996). Such arrangements can include configurations of state-of-the-art policing technologies for delineating and demarcating borders...... status updates on identity checks at the metro stations in Stockholm and reports on locations and time of ticket controls for warning travelers. Thus the attempts by authorities to exert control over the (spatial) arena of the underground is circumvented by the effective developing of an alternative...... infrastructural "underground" consisting of assemblages of technologies, activists, immigrants without papers, texts and emails, homes, smart phones and computers. Investigating the embedded politics of contested spatial arrangements as characteristic of specific societies one can discover not only the uses...

  1. A Real-Time Construction Safety Monitoring System for Hazardous Gas Integrating Wireless Sensor Network and Building Information Modeling Technologies.

    Science.gov (United States)

    Cheung, Weng-Fong; Lin, Tzu-Hsuan; Lin, Yu-Cheng

    2018-02-02

    In recent years, many studies have focused on the application of advanced technology as a way to improve management of construction safety management. A Wireless Sensor Network (WSN), one of the key technologies in Internet of Things (IoT) development, enables objects and devices to sense and communicate environmental conditions; Building Information Modeling (BIM), a revolutionary technology in construction, integrates database and geometry into a digital model which provides a visualized way in all construction lifecycle management. This paper integrates BIM and WSN into a unique system which enables the construction site to visually monitor the safety status via a spatial, colored interface and remove any hazardous gas automatically. Many wireless sensor nodes were placed on an underground construction site and to collect hazardous gas level and environmental condition (temperature and humidity) data, and in any region where an abnormal status is detected, the BIM model will alert the region and an alarm and ventilator on site will start automatically for warning and removing the hazard. The proposed system can greatly enhance the efficiency in construction safety management and provide an important reference information in rescue tasks. Finally, a case study demonstrates the applicability of the proposed system and the practical benefits, limitations, conclusions, and suggestions are summarized for further applications.

  2. Innovating Technological Process for Expanding the Service Life of Underground Power Cables

    Directory of Open Access Journals (Sweden)

    Tabacaru V.

    2016-08-01

    Full Text Available As a public power distribution operator on low voltage (023/0.4 kV, medium voltage (6 and 20 kV, and high voltage (110 kV in the territory of Galati County, SDEE Galati serves approximately 240,000 consumers (captive and eligible, domestic and non-domestic For this purpose, in the field of medium voltage underground distribution lines, SDEE Galati manages and operates a volume of approx. 500 km UDL/6kV circuit and approximately 630 km UDL/20 kV circuit. Many of these cables which are still in operation, were manufactured with materials and on the technological level of the ’60s,’70s and ‘80s decades and have reached the end of their service life. Evidence does and incident statistics from these networks in which, every year, one of the "tips" is the medium voltage cables damaged "technical wear" normal operating conditions. The current paper will present the main features of an innovating technological process called SPR (Sustained Pressure Rejuvenation, designed for on-site refurbishing of underground power cable insulation medium and high voltage. The process offers a viable alternative that has proven, over the 25 years of application initially on the American content and now on the worldwide, substantially more cost effective than replacing cables. The paper does not propose detailed presentation of the technological process, but to inform the family of energetics NPS about the existence and the benefits of applying this new technological process to the old cable medium and high voltage.

  3. A Psychosocial Approach to Understanding Underground Spaces

    Directory of Open Access Journals (Sweden)

    Eun H. Lee

    2017-03-01

    Full Text Available With a growing need for usable land in urban areas, subterranean development has been gaining attention. While construction of large underground complexes is not a new concept, our understanding of various socio-cultural aspects of staying underground is still at a premature stage. With projected emergence of underground built environments, future populations may spend much more of their working, transit, and recreational time in underground spaces. Therefore, it is essential to understand the challenges and advantages that such environments have to improve the future welfare of users of underground spaces. The current paper discusses various psycho-social aspects of underground spaces, the impact they can have on the culture shared among the occupants, and possible solutions to overcome some of these challenges.

  4. Importance of well logging measurements in the design of underground railway tunnels

    International Nuclear Information System (INIS)

    Kiss, E.Z.; Szlaboczky, P.

    1981-01-01

    The paper shows how logs can be used in the construction of underground railway tunnels in terciary sediments. Even standard well logging techniques (electric conductivity, gamma logging) can provide important additional information on the wells if conclusions concerning construction technology are gained from the logs. In the course of continuous research work the application of well logs renders an essential help if the measurements give in-situ information on absolute values of the well sections by revealing the various geological formations based on the distribution of characteristic parameters. Well logging increases the resolving power of the mechanical method of layer differentiation. Beside the usual geological interpretation of logs the zones of shifting rocks, hard and friable formations as well as intercalations leading to problems in construction technology can be pointed out. (author)

  5. Enhancement of organizational and technical solutions regarding anchoring of completed construction facilities of underground railway system to operating control

    Directory of Open Access Journals (Sweden)

    Е. Г. Козин

    2017-12-01

    Full Text Available Stages of practical realization of measures prescribed by requirements documents regarding anchoring of capital structures of underground railway system to operating control are considered in the article. On the basis of algorithm structure analysis, which includes obtaining a permit for putting into operation and cadastre works execution a range of solutions was proposed concerning optimization of construction project owner and operating organization activities with the purpose of terms reduction of capital structures handover to operation. The results of work of a commission responsible for completed underground railway system objects acceptance and putting into operation were analyzed. Considering example of object «Second entrance hall area of «Sportivnaya» station the statistical data of revealed snagging items is consolidated and dynamics of corrective actions is provided.Proposed solutions laid the foundation for corrections of requirements documents and were accepted for realization in the process of works acceptance of Saint-Petersburg underground railway system objects.

  6. Countermeasures planned for reducing water inflow into deep shafts at the Mizunami Underground Research Laboratory. Research for post-excavation grouting

    International Nuclear Information System (INIS)

    Kuji, Masayoshi; Matsui, Hiroya; Hara, Masato; Mikake, Shinichiro; Takeuchi, Shinji; Asai, Hideaki; Minamide, Masashi; Sato, Toshinori

    2009-01-01

    A large amount of water inflow is frequently occurs during the excavation of an underground cavern, such as road and railway tunnels, and underground electric facilities etc. The reduction of water inflow is sometimes quite important for the cost reduction for the water treatment and pumping during the construction of an underground cavern. The Mizunami Underground Research Laboratory (MIU) is currently being constructed by Japan Atomic Energy Agency. During its excavation, a large amount of water inflow into the shafts has been increasing and affecting the project progress. Therefore, a field experiment of post-excavation grouting around the Ventilation Shaft in a sedimentary formation carried out to confirm the effect of existing grouting technology for sedimentary formations in MIU project. The result shows that the applied methods in this field experiment are effective to prevent water inflow. This report describes the summary of the field experiment and the knowledge obtained through the experiment. (author)

  7. Regulatory analysis for the use of underground barriers at the Hanford Site tank farms

    International Nuclear Information System (INIS)

    Hampsten, K.L.

    1994-01-01

    Sixty-seven of the single-shell tanks at the Hanford Site, Richland, Washington, are assumed to have leaked in the past. Some of the waste retrieval options being considered, such as past-practice sluicing (a process that uses hot water to dislodge waste for subsequent removal by pumping), have the potential for increasing releases of dangerous waste from these tanks. Underground barrier systems are being evaluated as a method to mitigate releases of tank waste to the soil and groundwater that may occur during retrieval activities. The following underground barrier system options are among those being evaluated to determine whether their construction at the Single-Shell Tank Farms is viable. (1) A desiccant barrier would be created by circulating air through the subsurface soil to lower and then maintain the water saturation below the levels required for liquids to flow. (2) An injected materials barrier would be created by injecting materials such as grout or silica into the subsurface soils to form a barrier around and under a given tank or tank farm. (3) A cryogenic barrier would be created by freezing subsurface soils in the vicinity of a tank or tank farm. An analysis is provided of the major regulatory requirements that may impact full scale construction and operation of an underground barrier system and a discussion of factors that should be considered throughout the barrier selection process, irrespective of the type of underground barrier system being considered. However, specific barrier systems will be identified when a given regulation will have significant impact on a particular type of barrier technology. Appendix A provides a matrix of requirements applicable to construction and operation of an underground barrier system

  8. Underground risk management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Matsuyama, S.; Inoue, M.; Sakai, T.

    2006-03-15

    JCOAL has conducted Joint Research on an Underground Communication and Risk Management Information System with CSIRO of Australia under a commissioned study project for the promotion of coal use starting in fiscal 2002. The goal of this research project is the establishment of a new Safety System focusing on the comprehensive risk management information system by the name of Nexsys. The main components of the system are the Ethernet type underground communication system that represents the data communication base, and the risk management information system that permits risk analysis in real-time and provides decision support based on the collected data. The Nexsys is an open system and is a core element of the underground monitoring system. Using a vast amount of underground data, it is capable of accommodating a wide range of functions that were not available in the past. Because of it, it is possible to construct an advanced underground safety system. 14 figs., 4 tabs.

  9. Review of Trenchless Technologies' Successes and their ...

    African Journals Online (AJOL)

    ... costly construction modifications, and use of substandard borrow material, environmental damage to the site, post construction remedial work, and even failure of a structure and subsequent litigation. Trenchless technology can be defined as the use of construction methods to install and repair underground infrastructure ...

  10. Final report on the surface-based investigation phase (phase 1) at the Mizunami Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Matsuoka, Toshiyuki

    2011-03-01

    procedure from investigation to assessment was compiled as a set of geosynthesis data flow diagram for each investigation step. With regard to the overall project goals 2), 'To formulate detailed design concepts and a construction plan for the underground facilities,' an optimal design of MIU was completed with the aim to provide a foundation for engineering technologies in deep underground to safely construct and operate an underground facility which will be built for the purpose of acquiring data and demonstrating disposal technologies. Thus, this report summarizes geosynthesis procedures to investigate and assess the crystalline rock, and development of individual investigation and assessment methods. At the same time, technical findings and know-how which can serve as foundation to implementation of the disposal project were compiled. Also, this report clarified the necessity for the Phase II and Phase III investigation by compiling unresolved issues during the Phase I investigation. The results described in this report will be utilized as technical knowledge of disposal technology and effectively used to enhance technical foundation which will support both the implementation and formulation of safety regulations. (author)

  11. Status and prospects of a deep underground laboratory in China

    International Nuclear Information System (INIS)

    Kang, K J; Cheng, J P; Li, Y J; Yue, Q; Chen, Y H; Shen, M B; Wu, S Y

    2010-01-01

    An excellent candidate location for a deep underground laboratory with more than 2500 m of rock overburden has been identified at Sichuan Province in China. It can be accessed through a road tunnel of length 17.5 km, and is supported by services and amenities near the entrance provided by the local Ertan Hydropower Plant. The particle physics community in China is actively pursuing the construction of an underground laboratory at this location, under the leadership of Tsinghua University. Memorandum has been signed with Ertan Hydropower Plant which permits access to and construction of the underground laboratory - China JinPing Deep Underground Laboratory (CJPL). The basic features of this underground site, as well as the status and schedules of the construction of the first laboratory cavern are presented. The immediate goal is to have the first experiment operational in 2010, deploying an Ultra-Low-Energy Germanium detector for WIMP dark matter searches, with emphasis on the mass range of 1-10 GeV. The conceptual design of the experiment, as well as the future plans and prospects of the laboratory, will be surveyed.

  12. Collection of URL measurement data in 2006 at the Horonobe Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Kumagai, Yasuhito; Funaki, Hironori; Yamasaki, Masanao; Yamaguchi, Takehiro; Sanada, Hiroyuki; Abe, Hironobu; Orukawa, Go

    2008-07-01

    The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists two major research area, Geoscientific Research' and 'R and D on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. The Phase I geoscientific research was carried out from March 2001 to March 2005 in parallel with design and execution scheme on URL facilities. In addition, identifying key issues that need to be addressed in the Phase II/III investigations was carried out. At the inception of the Phase II investigations, an investigation report titled 'Measurement Plan and Observational Construction Program on Shaft Excavation at the Horonobe Underground Research Laboratory Project' (hereinafter referred to as Observational Construction Program') was published. The Observational Construction Program summarizes followings lessons learnt from the Phase I investigations: measurements for safety/reasonable construction, measurements for R and D on enhancement of shaft design/construction technology, and measurements for verification of the deep geological environment estimated before shaft excavation. This report summarizes the measurements data acquired at the Ventilation Shaft (to approx. 50m depth) and the East Shaft (to approx. 40m depth) in 2006 based on the Observational Construction Program. CD-ROM and DVD-ROM are attached as an appendix. (J.P.N.)

  13. Multinational underground nuclear parks

    Energy Technology Data Exchange (ETDEWEB)

    Myers, C.W. [Nuclear Engineering and Nonproliferation Division, Los Alamos National Laboratory, MS F650, Los Alamos, NM 87544 (United States); Giraud, K.M. [Wolf Creek Nuclear Operating Corporation, 1550 Oxen Lane NE, P.O. Box 411, Burlington, KS 66839-0411 (United States)

    2013-07-01

    Newcomer countries expected to develop new nuclear power programs by 2030 are being encouraged by the International Atomic Energy Agency to explore the use of shared facilities for spent fuel storage and geologic disposal. Multinational underground nuclear parks (M-UNPs) are an option for sharing such facilities. Newcomer countries with suitable bedrock conditions could volunteer to host M-UNPs. M-UNPs would include back-end fuel cycle facilities, in open or closed fuel cycle configurations, with sufficient capacity to enable M-UNP host countries to provide for-fee waste management services to partner countries, and to manage waste from the M-UNP power reactors. M-UNP potential advantages include: the option for decades of spent fuel storage; fuel-cycle policy flexibility; increased proliferation resistance; high margin of physical security against attack; and high margin of containment capability in the event of beyond-design-basis accidents, thereby reducing the risk of Fukushima-like radiological contamination of surface lands. A hypothetical M-UNP in crystalline rock with facilities for small modular reactors, spent fuel storage, reprocessing, and geologic disposal is described using a room-and-pillar reference-design cavern. Underground construction cost is judged tractable through use of modern excavation technology and careful site selection. (authors)

  14. THE ANALYSIS OF INTENSE-DEFORMED MONOLITHIC CONCRETE STRIP STATE OF UNDERGROUND STRUCTURES OF NONCIRCULAR OUTLINE

    Directory of Open Access Journals (Sweden)

    Maria Aleksandrovna Bauer

    2017-12-01

    Full Text Available The research results of intense deformed state (IDS of the crepe and soil massif of un-derground structures having a non-circular outline with a depth of laying up to 50 m in unstable al-luvial rocks with dumps from 0.3 to 0.7 m are presented. The study was carried out by means of modeling the IDS of the soil massif and the hardening concrete of the monolithic support, erected after slaughter moving. To implement the proposed technological solutions ensuring the fixing of underground structures with monolithic concrete, it is necessary to use particularly fast solidifying compounds to exclude the use of temporary crepe. Based on the studies of a number of modifiers, various changes in mechanical properties of the most effective compositions have been established, which are used to simulate the concrete crepe of structures with time-varying characteristics. Purpose: the basis for using resource-saving technology for the construction of underground structures in a non-circular outline in a soil massif. Methods and methodology of the work: the studies were carried out by means of the finite element method (FEM using the optimal design of the experiment. Results: stress distributions were obtained in the hardening concrete crepe structures, stress concentration zones were established, displacement values in the soil massif and their spread on the surface were recieved. Areas of the result application: the results of research work can be used in the design of options for the construction of underground structures.

  15. DOE underground storage tank waste remediation chemical processing hazards. Part I: Technology dictionary

    International Nuclear Information System (INIS)

    DeMuth, S.F.

    1996-10-01

    This document has been prepared to aid in the development of Regulating guidelines for the Privatization of Hanford underground storage tank waste remediation. The document has been prepared it two parts to facilitate their preparation. Part II is the primary focus of this effort in that it describes the technical basis for established and potential chemical processing hazards associated with Underground Storage Tank (UST) nuclear waste remediation across the DOE complex. The established hazards involve those at Sites for which Safety Analysis Reviews (SARs) have already been prepared. Potential hazards are those involving technologies currently being developed for future applications. Part I of this document outlines the scope of Part II by briefly describing the established and potential technologies. In addition to providing the scope, Part I can be used as a technical introduction and bibliography for Regulatory personnel new to the UST waste remediation, and in particular Privatization effort. Part II of this document is not intended to provide examples of a SAR Hazards Analysis, but rather provide an intelligence gathering source for Regulatory personnel who must eventually evaluate the Privatization SAR Hazards Analysis

  16. Underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    Bender, F.

    1982-01-01

    The symposium gave the opportunity for an international exchange of views on the concepts of underground nuclear power plants, which are presently world wide under consideration. The results of investigations into the advantages and disadvantages with regard to the technical safety aspects of the underground plants in comparison to plants on the surface led to open and sometimes controversal discussions. As a result of the symposium (32 contributions) a general agreement can be stated on the judgement concerning the advantages and the disadvantages of underground nuclear power plants (nnp). The advantages are: increased protection against external events; delayed release of fission products in accident situations, if the closures operate properly. The disadvantages are: increased costs of the construction of underground and restrictions to such sites where either large caverns or deep pits can be constructed, which also requires that certain technical problems must be solved beforehand. Also, additional safety certificates related to the site will be required within the licensing procedures. The importance of these advantages and disadvantages was in some cases assessed very differently. The discussions also showed, that there are a number of topics where some questions have not been finally answered yet. (orig./HP) [de

  17. Transmission line undergrounding : rate impact investigation and analysis

    International Nuclear Information System (INIS)

    2004-01-01

    In response to concerns expressed by the residents of Markham, Ontario regarding the possible environmental and health impacts of a proposed 230 kV overhead transmission line, Hydro One Networks Inc. (HONI) has proposed to place the line underground as an alternative. This analysis was prepared to evaluate the potential impacts on transmission rates and consumer prices related to changes in the level of underground construction of transmission lines by HONI, as opposed to overhead construction. The report presents the approach to data collection; cost estimates and projections; the modeling and projecting of HONI's regulated rate base and revenue requirement on a basis that reflects the manner in which its future transmission rates are expected to be established; estimates of the incremental cost of undergrounding reflecting a range of reasonable assumptions; and a comparison of the resulting transmission costs and total customer bill. To address the issue of potential demand in other municipalities for additional undergrounding, the study also examined the cumulative effects of ten years' incremental undergrounding costs (i.e. effects on 2014 rates). It was concluded that if HONI were to implement an undergrounding program beginning in 2005, resulting in the installation of 80 km of underground lines by 2014, and shared costs by all users of HONI's system through the network transmission charges, the 2014 transmission rates would be higher. 5 tabs

  18. A Wireless LAN and Voice Information System for Underground Coal Mine

    OpenAIRE

    Yu Zhang; Wei Yang; Dongsheng Han; Young-Il Kim

    2014-01-01

    In this paper we constructed a wireless information system, and developed a wireless voice communication subsystem based on Wireless Local Area Networks (WLAN) for underground coal mine, which employs Voice over IP (VoIP) technology and Session Initiation Protocol (SIP) to achieve wireless voice dispatching communications. The master control voice dispatching interface and call terminal software are also developed on the WLAN ground server side to manage and implement the voice dispatching co...

  19. Drawing from past experience to improve the management of future underground projects

    International Nuclear Information System (INIS)

    Laughton, Christopher; Fermilab

    2004-01-01

    The high-energy physics community is currently developing plans to build underground facilities as part of its continuing investigation into the fundamental nature of matter. The tunnels and caverns are being designed to house a new generation of particle accelerators and detectors. For these projects, the cost of constructing the underground facility will constitute a major portion of the told capital cost and project viability can be greatly enhanced by paying careful attention to design and construction practices. A review of recently completed underground physics facilities and related literature has been undertaken to identify some management principles that have proven successful in underground practice. Projects reviewed were constructed in the United States of America and Europe using both Design-Build and more traditional Engineer-Procure-Construct contract formats. Although the physics projects reviewed tend to place relatively strict tolerances on alignment, stability and dryness, their overall requirements are similar to those of other tunnels and it is hoped that some of the principles promoted in this paper will be of value to the owner of any underground project

  20. Mizunami Underground Research Laboratory project. Annual report for fiscal year 2007

    International Nuclear Information System (INIS)

    Nishio, Kazuhisa; Matsuoka, Toshiyuki; Tsuruta, Tadahiko; Amano, Kenji; Ohyama, Takuya; Takeuchi, Ryuji; Saegusa, Hiromitsu; Hama, Katsuhiro; Mizuno, Takashi; Sai, Masataka; Hirano, Toru; Iyatomi, Yosuke; Shimada, Akiomi; Matsui, Hiroya; Ogata, Nobuhisa; Uchida, Masahiro; Sugihara, Kozo; Mikake, Shinichiro; Ikeda, Koki; Yamamoto, Masaru

    2009-03-01

    Japan Atomic Energy Agency (JAEA) at Tono Geoscience Center (TGC) is developing a geoscientific research project named Mizunami Underground Research Laboratory (MIU) Project in crystalline rock environment in order to establish scientific and technological basis for geological disposal of HLW. Geoscientific research at MIU is planned to be carried out in three phases over a period of 20 years; Surface-based Investigation Phase (Phase I), Construction Phase (Phase II) and Operation Phase (Phase III). Currently, the project is under the Construction Phase. This document presents the following results of the research and development performed in fiscal year 2007, as a part of the Construction Phase based on the MIU Master Plan updated in 2002, 1) Investigation at the MIU Construction Site and the Shobasama Site, 2) Construction at the MIU Construction Site, 3) Research Collaboration. (author)

  1. Mizunami Underground Research Laboratory project. Annual report for fiscal year 2005

    International Nuclear Information System (INIS)

    Nishio, Kazuhisa; Matsuoka, Toshiyuki; Tsuruta, Tadahiko; Amano, Kenji; Ohyama, Takuya; Takeuchi, Ryuji; Saegusa, Hiromitsu; Hama, Katsuhiro; Mizuno, Takashi; Sai, Masataka; Iyatomi, Yosuke; Shimada, Akiomi; Ogata, Nobuhisa; Uchida, Masahiro; Sugihara, Kozo; Mikake, Shinichiro; Ikeda, Koki; Yamamoto, Masaru; Yoshida, Haruo; Nakama, Shigeo; Seno, Yasuhiro; Kuroda, Hidetaka; Semba, Takeshi

    2009-03-01

    Japan Atomic Energy Agency (JAEA) at Tono Geoscience Center (TGC) is developing a geoscientific research project named Mizunami Underground Research Laboratory (MIU) project in crystalline rock environment in order to establish scientific and technological basis for geological disposal of HLW. Geoscientific research at MIU is planned to be carried out in three phases over a period of 20 years; Surface-based Investigation Phase (Phase 1), Construction Phase (Phase 2) and Operation Phase (Phase 3). Currently, the project is under the Construction Phase. This document presents the following results of the research and development performed in 2005 fiscal year, as a part of the Construction Phase based on the MIU Master Plan updated in 2002, 1) Investigation at the MIU Construction Site and the Shobasama Site, 2) Construction at the MIU Construction Site, 3) Research Collaboration. (author)

  2. Mizunami Underground Research Laboratory project. Annual report for fiscal year 2008

    International Nuclear Information System (INIS)

    Takeuchi, Shinji; Kunimaru, Takanori; Nishio, Kazuhisa; Tsuruta, Tadahiko; Matsuoka, Toshiyuki; Hayano, Akira; Takeuchi, Ryuji; Saegusa, Hiromitsu; Ohyama, Takuya; Mizuno, Takashi; Hirano, Toru; Ogata, Nobuhisa; Hama, Katsuhiro; Iyatomi, Yosuke; Shimada, Akiomi; Matsui, Hiroya; Ito, Hiroaki; Sugihara, Kozo; Mikake, Shinichiro; Ikeda, Koki; Yamamoto, Masaru

    2010-07-01

    Japan Atomic Energy Agency (JAEA) at Tono Geoscience Center (TGC) is developing a geoscientific research project named Mizunami Underground Research Laboratory (MIU) Project in crystalline rock environment in order to establish scientific and technological basis for geological disposal of HLW. Geoscientific research at MIU is planned to be carried out in three phases over a period of 20 years; Surface-based Investigation Phase (Phase 1), Construction Phase (Phase 2) and Operation Phase (Phase 3). Currently, the project is under the Construction Phase. This document presents the following results of the research and development performed in fiscal year 2008, as a part of the Construction Phase based on the MIU Master Plan updated in 2002, 1) Investigation at the MIU Construction Site and the Shobasama Site, 2) Construction at the MIU Construction Site, 3) Research Collaboration. (author)

  3. Rebirth of a 100-year-old technology: underground coal gasification

    Energy Technology Data Exchange (ETDEWEB)

    Young, B.C.; Harju, J.A.; Schmit, C.R.; Solc, J. [North Dakota Univ., Grand Forks, ND (United States). Energy and Environmental Research Center; Boysen, J.E. [B.C. Technologies Ltd. (Country unknown/Code not available); Kuehnel, R.A. [International Institute for Aerospace Survey and Earth Sciences (Netherlands); Walker, L.K. [Innisfree Pty. Ltd. (Country unknown/Code not available); Komsartra, C. [Electricity Generating Authority of Thailand, Nonthaburi (Thailand)

    1997-04-01

    Underground coal gasification (UCG) is a clean coal technology that was first conceived by Mendeleev in Russia over 100 years ago. It involves the conversion of coal in situ to a low-to-medium grade product gas, avoiding the expense of mining and reclamation. The successful application of UCG is critically dependent on both judicious site selection and process design specific to that site. It requires a detailed knowledge and understanding of those geologic, hydrogeologic, and other site characteristics critical to the technical success and environmental acceptability of the process. This paper addresses the development and key features of UCG and describes a UCG feasibility project now under way in Southern Thailand on a lignite deposit. The relevance of the technology to the long-term supply of gas to the Eastern States of Australia is also discussed. It is concluded that the lack of acceptance of the technology to date follows from a confusion in the interpretation of test results from the different hydrogeologic settings of previous UCG test sites. Successful development of the technology requires the careful assembly of an integrated design team with hydrogeologic, geologic mineralogic, chemical and engineering expertise. (author). 1 fig., 11 refs.

  4. Collection of URL measurement data in 2007 at the Horonobe Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Yamasaki, Masanao; Funaki, Hironori; Niinuma, Hiroaki; Fujikawa, Daisuke; Sanada, Hiroyuki; Hiraga, Naoto; Tsusaka, Kimikazu; Yamaguchi, Takehiro

    2008-11-01

    The Horonobe Underground Research Laboratory (URL) Project has being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists of two major research areas, Geoscientific Research' and 'R and D on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. The Phase I geoscientific research was planned from March 2001 to March 2006 in parallel with design and execution scheme on URL facilities. In addition, identifying key issues that need to be addressed in the Phase II/III investigations was planned. At the beginning of the Phase II investigations, an investigation report titled 'Measurement Plan and Observational Construction Program on Shaft Excavation at the Horonobe Underground Research Laboratory Project' (hereinafter referred to as 'Observational Construction Program') was published. The Observational Construction Program summarizes the followings from the results of the Phase I investigations: measurements for safety and reasonable constructions, enhancement of shaft design and construction technologies and evaluation of appropriateness for the deep geological environment model estimated before shaft excavation. This report summarizes the measurements data acquired at the Ventilation Shaft, the East Shaft and the drifts in 2007 based on the Observational Construction Program. The report summarizes for the purpose of the following: sharing the investigation and measurements data, preventing the loss of them and acquisition the basic data for carrying out the Observational Construction Program. Two DVD-ROMs are attached as an appendix. (J.P.N.)

  5. Application Analysis of BIM Technology in Metro Rail Transit

    Science.gov (United States)

    Liu, Bei; Sun, Xianbin

    2018-03-01

    With the rapid development of urban roads, especially the construction of subway rail transit, it is an effective way to alleviate urban traffic congestion. There are limited site space, complex resource allocation, tight schedule, underground pipeline complex engineering problems. BIM technology, three-dimensional visualization, parameterization, virtual simulation and many other advantages can effectively solve these technical problems. Based on the project of Shenzhen Metro Line 9, BIM technology is innovatively researched throughout the lifecycle of BIM technology in the context of the metro rail transit project rarely used at this stage. The model information file is imported into Navisworks for four-dimensional animation simulation to determine the optimum construction scheme of the shield machine. Subway construction management application platform based on BIM and private cloud technology, the use of cameras and sensors to achieve electronic integration, dynamic monitoring of the operation and maintenance of underground facilities. Make full use of the many advantages of BIM technology to improve the engineering quality and construction efficiency of the subway rail transit project and to complete the operation and maintenance.

  6. Technology Management on Large Construction Projects

    DEFF Research Database (Denmark)

    Bonke, Sten

    The aim of this text is to discuss and to develop the concept of technology management in relation to the empirical field of construction projects. In the first of the two main sections central theories and their derived assertions concerning technology management criteria are summed up...... Fixed Link construction project. Finally on this basis the concluding remarks are pointing to the main theoretical problems and their practical implementations for the introduction of a technology management discipline in construction....... in a schematic theoretical framework. Hereafter the general characteristics of construction are examined from the point of view of serving as an empirical field for technology management analysis. In the second section the technology management theme is associated with the empirical properties of the Great Belt...

  7. High Temperature Superconducting Underground Cable

    International Nuclear Information System (INIS)

    Farrell, Roger A.

    2010-01-01

    The purpose of this Project was to design, build, install and demonstrate the technical feasibility of an underground high temperature superconducting (HTS) power cable installed between two utility substations. In the first phase two HTS cables, 320 m and 30 m in length, were constructed using 1st generation BSCCO wire. The two 34.5 kV, 800 Arms, 48 MVA sections were connected together using a superconducting joint in an underground vault. In the second phase the 30 m BSCCO cable was replaced by one constructed with 2nd generation YBCO wire. 2nd generation wire is needed for commercialization because of inherent cost and performance benefits. Primary objectives of the Project were to build and operate an HTS cable system which demonstrates significant progress towards commercial progress and addresses real world utility concerns such as installation, maintenance, reliability and compatibility with the existing grid. Four key technical areas addressed were the HTS cable and terminations (where the cable connects to the grid), cryogenic refrigeration system, underground cable-to-cable joint (needed for replacement of cable sections) and cost-effective 2nd generation HTS wire. This was the worlds first installation and operation of an HTS cable underground, between two utility substations as well as the first to demonstrate a cable-to-cable joint, remote monitoring system and 2nd generation HTS.

  8. Concept Design and Development Model of Underground Villas

    Directory of Open Access Journals (Sweden)

    Xinrong Liu

    2015-08-01

    Full Text Available With the rapid development of society, modern buildings have been consuming excessive amount of energy and resources. Eco-friendly building is going to be the leading style of architecture in the future. Underground villa, as a type of energy efficient architecture, has widely drawn humans’ attention. However, Chinese are still at an exploratory stage in terms of the development of underground construction. This paper describes several typical underground villas in western developed countries; briefly states the advantages and shortcomings of underground villas; discusses the design of style-planning, inner-space design, lighting and ventilation, and waterproof and fireproof of underground villas; also puts forward how to improve the living environment of underground villas. Besides, the paper suggests an innovative concept of underground living that best suits China’s market based on the merits of underground villas and the analysis upon China’s traditional cave-house. In addition, it roughly analyzes the prospect of this innovate style of dwelling in China.

  9. RADIATION SAFETY JUSTIFICATION FOR THE LONG-TERM STORAGE OF GAS CONDENSATE IN THE UNDERGROUND RESERVOURS FORMED BY THE NUCLEAR EXPLOSION TECHNOLOGY

    Directory of Open Access Journals (Sweden)

    I. K. Romanovich

    2010-01-01

    Full Text Available The paper presents approaches to the safety justification of the gas condensate and brine long-term storage in the underground reservoirs formed by the nuclear explosion technology. Gas condensate and brine are the intermediate level liquid radioactive waste containing isotopes: 3Н, 137Cs and 90Sr, in traces - 239Pu, 235U, 241Am.Safety of the gas condensate and brine long-term storage in the underground reservoirs is assessed on the base of the multi-barrier principle implementation, used during radioactive waste disposal. It is shown that the gas condensate and brine long-term storage in the sealed underground reservoirs formed by nuclear explosion technologies in salt domes does not lead to the surface radioactive contamination and population exposure.

  10. Study on construction method of concrete in the underground research laboratory. 2

    International Nuclear Information System (INIS)

    Iriya, Keishiro; Mikami, Tetsuji; Akiyoshi, Kenji; Uegaki, Yoshiaki

    2002-02-01

    The underground research laboratory, which will be constructed in Horonobe, plays a role of demonstration of construction technique upon nuclear waste repositories. Low alkalinity cement is one of candidates for repositories as a cementitious material in order to prevent alteration of bentonite and rock by hyper alkaline solution. JNC has developed a low alkalinity cement (HFSC) which contains a lot of fly ash, and has studied the physical and chemical properties by laboratory test. However workability which is required for construction procedure of repositories has not been studied enough yet. This study shows if requirements in actual construction, such as shotcreting, self-compacting, and, grouting, are fulfilled, and if the workability is preferable for tunneling construction. It is demonstrated that HFSC is applicable for shotcreting by testing in a modeled tunnel. It is pointed out that re-bars have a possibility of corrosion in low alkalinity cement. In-site test for saline water which may accelerate corrosion is started by setting specimen made in last year. Analyzing and assessing will be done next year. Construction method of tunnel lining is investigated in case of applying pre-cast segments. Self-compacting concrete is adopted, since added silica-fume needs superplasticizer and its workability is very flowable. Two piece of segment were made for the section which designed for a ordinary urban tunnel. It is noted that pre-casting concrete can be made by HFSC. Super fine cement powder for grouting which indicate low alkalinity can be selected by combination of grinned lime stone powder and silica fume with grinned ordinary Portland cement. The items to be improved toward using in Horonobe construction are pointed out by results of this study and summarized a study plan is described. Major problem to be solved is delaying compressive strength generation of HFSC. It is recognized in shotcrete and self-compacting concrete. Selecting types of fly ash and

  11. Underground Gas Storage in the World 2013 (fifth edition)

    International Nuclear Information System (INIS)

    Cornot-Gandolphe, Sylvie

    2013-06-01

    Since its first publication in 1990, 'Underground Gas Storage in the World' has been the industry's reference on underground gas storage (UGS). The updated 2013 edition includes in-depth CEDIGAZ's analyses of the latest developments and trends in the storage industry all over the world as well as extensive country analyses with complete datasets including current, under construction and planned Underground Gas Storage facilities in 48 countries. It describes the 688 existing storage facilities in the world and the 236 projects under construction and planned. Future storage demand and its main drivers are presented at global and regional levels. The study builds on the CEDIGAZ Underground Gas Storage Database, the only worldwide Underground Gas Storage database to be updated every year. This document summarizes the key findings of the Survey which includes four main parts: The first part gives an overview of underground gas storage in the world at the beginning of 2013 and analyzes future storage needs by 2030, at regional and international levels. The second part focuses on new trends and issues emerging or developing in key storage markets. It analyzes the emerging storage market in China, reviews the storage business climate in Europe, examines Gazprom's storage strategy in Europe, and reviews recent trends in storage development in the United States. The third part gives some fundamental background on technical, economic and regulatory aspects of gas storage. The fourth part gives a countrywide analysis of the 48 countries in the world holding underground gas storage facilities or planning storage projects. 48 countries are surveyed with 688 existing UGS facilities, 256 projects under construction or planned

  12. Horonobe Underground Research Laboratory project. Synthesis of phase II (construction phase) investigations to a depth of 350 m

    International Nuclear Information System (INIS)

    Sato, Toshinori; Sasamoto, Hiroshi; Ishii, Eiichi; Matsuoka, Toshiyuki; Hayano, Akira; Miyakawa, Kazuya; Fujita, Tomoo; Tanai, Kenji; Nakayama, Masashi; Takeda, Masaki; Yokota, Hideharu; Aoyagi, Kazuhei; Ohno, Hirokazu; Shigeta, Naotaka; Hanamuro, Takahiro; Ito, Hiroaki

    2017-03-01

    The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. This report summarizes the results of the Phase II investigations carried out from April 2005 to June 2014 to a depth of 350 m. Integration of work from different disciplines into a 'geosynthesis' ensures that the Phase II goals have been successfully achieved and identifies key issues that need to be addressed in the Phase II investigations. Efforts are made to summarize as many lessons learnt from the Phase II investigations and other technical achievements as possible to form a 'knowledge base' that will reinforce the technical basis for both implementation and the formulation of safety regulations. (author)

  13. A research on the excavation, support, and environment control of large scale underground space

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Pil Chong; Kwon, Kwang Soo; Jeong, So Keul [Korea Institute of Geology Mining and Materials, Taejon (Korea, Republic of)

    1995-12-01

    With the growing necessity of the underground space due to the deficiency of above-ground space, the size and shape of underground structures tend to be complex and diverse. This complexity and variety force the development of new techniques for rock mass classification, excavation and supporting of underground space, monitoring and control of underground environment. All these techniques should be applied together to make the underground space comfortable. To achieve this, efforts have been made on 5 different areas; research on the underground space design and stability analysis, research on the techniques for excavation of rock by controlled blasting, research on the development of monitoring system to forecast the rock behaviour of underground space, research on the environment inspection system in closed space, and research on dynamic analysis of the airflow and environmental control in the large geos-spaces. The 5 main achievements are improvement of the existing structure analysis program(EXCRACK) to consider the deformation and failure characteristics of rock joints, development of new blasting design (SK-cut), prediction of ground vibration through the newly proposed wave propagation equation, development and In-Situ application of rock mass deformation monitoring system and data acquisition software, and trial manufacture of the environment inspection system in closed space. Should these techniques be applied to the development of underground space, prevention of industrial disaster, cut down of construction cost, domestication of monitoring system, improvement of tunnel stability, curtailment of royalty, upgrade of domestic technologies will be brought forth. (Abstract Truncated)

  14. Information collection regarding geoscientific monitoring techniques during closure of underground facility in crystalline rock

    International Nuclear Information System (INIS)

    Hosoya, Shinichi; Yamashita, Tadashi; Iwatsuki, Teruki; Saegusa, Hiromitsu; Onoe, Hironori; Ishibashi, Masayuki

    2016-01-01

    The Mizunami Underground Research Laboratory (MIU) project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of geological disposal technologies through investigations of the deep geological environment in the crystalline host rock (granite) at Mizunami City in Gifu Prefecture, central Japan. On the occasion of the reform of the entire JAEA organization in 2014, JAEA identified the critical issues on the geoscientific research program: “Development of modelling technologies for mass transport”, “Development of drift backfilling technologies” and “Development of technologies for reducing groundwater inflow”, based on the latest results of the synthesizing R and D. The purposes of the “Development of drift backfilling technologies” are to develop closure methodology and technology, and long-term monitoring technology, and to evaluate resilience of geological environment. In order to achieve the purposes, previous information from the case example of underground facility constructed in crystalline rock in Europe has been collected in this study. In particular, the boundary conditions for the closure, geological characteristics, technical specifications, and method of monitoring have been focused. The information on the international project regarding drift closure test and development of monitoring technologies has also been collected. In addition, interviews were conducted to Finnish and Swedish specialists who have experiences involving planning, construction management, monitoring, and safety assessment for the closure to obtain the technical knowledge. Based on the collected information, concept and point of attention, which are regarding drift closure testing, and planning, execution management and monitoring on the closure of MIU, have been specified. (author)

  15. Leakproof control of technological installations and underground pipelines using radioactive tracers as a contribution to the protection of the natural environment

    International Nuclear Information System (INIS)

    Kras, J.; Walis, L.; Myczkowski, S.; Panczyk, E.

    2004-01-01

    The radioisotope method of leakproof control and leak localization has the following advantages: simplicity, short time of duration of experiment, low cost, short time need for adaptation of the object for the control, high sensitivity of measurements. Owing the application of the isotope technique is possible to carry out the expertise at low pressure, which permits to avoid strength effort of the construction materials. Through the radioisotope method is not a strength test it is complementary to pressure test (hydraulic or pneumatic). It should be noted that the hydraulic test cannot be applied to some technological objects despite the need of their leakproof control. The presentation deals with principles of application of the radioactive tracer - methyl bromide with Br-82, its preparation and ways of injecting the tracer and carrying out radiometric measurements in dependence on the kind of the object examined. The radioisotope tracer method for leakproof control of technological objects and underground pipelines as well as the apparatus used for this control have been developed in the Institute of Nuclear Chemistry and Technology and have been routinely used. (author)

  16. Underground coal gasification technology impact on coal reserves in Colombia

    Directory of Open Access Journals (Sweden)

    John William Rosso Murillo

    2013-12-01

    Full Text Available In situ coal gasification technology (Underground Coal Gasification–UCG– is an alternative to the traditional exploitation, due to it allows to reach the today’s inaccessible coal reserves’ recovery, to conventional mining technologies. In this article I answer the question on how the today’s reserves available volume, can be increased, given the possibility to exploit further and better the same resources. Mining is an important wealth resource in Colombia as a contributor to the national GDP. According with the Energy Ministry (Ministerio de Minas y Energía [1] mining has been around 5% of total GDP in the last years. This is a significant fact due to the existence of a considerable volume of reserves not accounted for (proved reserves at year 2010 were 6.700 million of tons. Source: INGEOMINAS and UPME, and the coal future role’s prospect, in the world energy production.

  17. The Application of RFID Technologies in Construction

    Institute of Scientific and Technical Information of China (English)

    LIAN Meng

    2009-01-01

    RFID technologies have advanced greatly and deployed successfully in many industry sectors in recent years. Construction industry could benefit from the applications of RFID technologies but as yet has not found sufficient application areas. This project gives a comprehensive awareness of the RFID technologies, which focus on the investigation on the UK construction industry. The current status of RFID in construction and its potentials are specified in the analysis of questionnaires and case studies. Finally, basing on the investigations, some further tasks in developing RFID technologies are carried, including some recommendations, for the construction industry.

  18. The arrangement of the seismic design method of the underground facility

    International Nuclear Information System (INIS)

    Tanai, Kenji; Horita, Masakuni; Dewa, Katsuyuki; Gouke, Mitsuo

    2002-03-01

    Earthquake resistance for the underground structure is higher than the ground structure. Therefore, the case of examining the earthquake resistance of underground structure was little. However, it carries out the research on the aseismic designing method of underground structure, since the tunnel was struck by Hyogo-ken Nanbu Earthquake, and it has obtained a much knowledge. However, an object of the most study was behavior at earthquake of the comparatively shallow underground structure in the alluvial plain board, and it not carry out the examination on behavior at earthquake of underground structure in the deep rock mass. In the meantime, underground disposal facility of the high level radioactive waste constructs in the deep underground, and it carries out the operation in these tunnels. In addition, it has made almost the general process of including from the construction start to the backfilling to be about 60 years (Japan Nuclear Fuel Cycle Development Institute, 1999). During these periods, it is necessary to also consider the earthquake resistance as underground structure from the viewpoint of the safety of facilities. Then, it extracted future problem as one of the improvement of the basis information for the decision of the safety standard and guideline of the country on earthquake-resistant design of the underground disposal facility, while it carried out investigation and arrangement of earthquake-resistant design cases, guidelines and analysis method on existing underground structure, etc. And, the research items for the earthquake resistance assessment of underground structure as case study of the underground research laboratory. (author)

  19. Underground gas storage in the World - 2013 (fifth Edition)

    International Nuclear Information System (INIS)

    Cornot-Gandolphe, Sylvie

    2013-07-01

    Since its first publication in 1990, 'Underground Gas Storage in the World' has been the industry's reference on underground gas storage (UGS). The updated 2013 edition includes in-depth CEDIGAZ's analyses of the latest developments and trends in the storage industry all over the world as well as extensive country analyses with complete datasets including current, under construction and planned Underground Gas Storage facilities in 48 countries. It describes the 688 existing storage facilities in the world and the 236 projects under construction and planned. Future storage demand and its main drivers are presented at global and regional levels. 'Underground Gas Storage in the World 2013' builds on the CEDIGAZ Underground Gas Storage Database, the only worldwide Underground Gas Storage database to be updated every year. The Survey includes four main parts: The first part gives an overview of underground gas storage in the world at the beginning of 2013 and analyzes future storage needs by 2030, at regional and international levels. The second part focuses on new trends and issues emerging or developing in key storage markets. It analyzes the emerging storage market in China, reviews the storage business climate in Europe, examines Gazprom's storage strategy in Europe, and reviews recent trends in storage development in the United States. The third part gives some fundamental background on technical, economic and regulatory aspects of gas storage. The fourth part gives a countrywide analysis of the 48 countries in the world holding underground gas storage facilities or planning storage projects. 48 countries surveyed, 688 existing UGS facilities, 256 projects under construction or planned. The document includes 70 tables, 72 charts and figures, 44 country maps. The countries surveyed are: Europe : Albania, Austria, Belgium, Bosnia, Bulgaria, Croatia, Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, Latvia, Lithuania, Netherlands, Poland

  20. 47 CFR 32.2422 - Underground cable.

    Science.gov (United States)

    2010-10-01

    ... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2422 Underground cable... manholes and ducts in connection with construction work and the cost of permits and privileges for the...

  1. Shallow groundwater intrusion to deeper depths caused by construction and drainage of a large underground facility. Estimation using 3H, CFCs and SF6 as trace materials

    International Nuclear Information System (INIS)

    Hagiwara, Hiroki; Iwatsuki, Teruki; Hasegawa, Takuma; Nakata, Kotaro; Tomioka, Yuichi

    2015-01-01

    This study evaluates a method to estimate shallow groundwater intrusion in and around a large underground research facility (Mizunami Underground Research Laboratory-MIU). Water chemistry, stable isotopes (δD and δ 18 O), tritium ( 3 H), chlorofluorocarbons (CFCs) and sulfur hexafluoride (SF 6 ) in groundwater were monitored around the facility (from 20 m down to a depth of 500 m), for a period of 5 years. The results show that shallow groundwater inflows into deeper groundwater at depths of between 200–400 m. In addition, the content of shallow groundwater estimated using 3 H and CFC-12 concentrations is up to a maximum of about 50%. This is interpreted as the impact on the groundwater environment caused by construction and operation of a large facility over several years. The concomitant use of 3 H and CFCs is an effective method to determine the extent of shallow groundwater inflow caused by construction of an underground facility. (author)

  2. Evaluation of the feasibility, economic impact, and effectiveness of underground nuclear power plants. Final technical report

    International Nuclear Information System (INIS)

    1978-05-01

    Information on underground nuclear power plants is presented concerning underground nuclear power plant concepts; public health impacts; technical feasibility of underground concepts; economic impacts of underground construction; and evaluation of related issues

  3. Advanced design and construction technology for ABWR

    International Nuclear Information System (INIS)

    Kawahara, Akira

    2003-01-01

    Recently, many countries start planning to construct nuclear plants, and the electric power companies and the plant suppliers are acutely aware of the importance of the technical infrastructure required for construction planning and execution as this has a significant influence on construction costs. Plant suppliers in Japan have been focusing its attention on the efficiency of construction from earlier, because of its significant role in determining overall construction costs. Through continuous efforts to reduce fieldwork costs, we have developed unique technologies, especially the 3D-CAD system and other advanced construction technologies including modularization. We, plant suppliers are now turning its attention to overseas nuclear plants construction also, and are developing more rational, economical, and global construction based on its vast experience in construction techniques. In this report, the evolution of plant engineering methods and construction technologies, the present level of progress in construction, and technical developments for the future, are described. (author)

  4. Urban underground infrastructure mapping and assessment

    Science.gov (United States)

    Huston, Dryver; Xia, Tian; Zhang, Yu; Fan, Taian; Orfeo, Dan; Razinger, Jonathan

    2017-04-01

    This paper outlines and discusses a few associated details of a smart cities approach to the mapping and condition assessment of urban underground infrastructure. Underground utilities are critical infrastructure for all modern cities. They carry drinking water, storm water, sewage, natural gas, electric power, telecommunications, steam, etc. In most cities, the underground infrastructure reflects the growth and history of the city. Many components are aging, in unknown locations with congested configurations, and in unknown condition. The technique uses sensing and information technology to determine the state of infrastructure and provide it in an appropriate, timely and secure format for managers, planners and users. The sensors include ground penetrating radar and buried sensors for persistent sensing of localized conditions. Signal processing and pattern recognition techniques convert the data in information-laden databases for use in analytics, graphical presentations, metering and planning. The presented data are from construction of the St. Paul St. CCTA Bus Station Project in Burlington, VT; utility replacement sites in Winooski, VT; and laboratory tests of smart phone position registration and magnetic signaling. The soil conditions encountered are favorable for GPR sensing and make it possible to locate buried pipes and soil layers. The present state of the art is that the data collection and processing procedures are manual and somewhat tedious, but that solutions for automating these procedures appear to be viable. Magnetic signaling with moving permanent magnets has the potential for sending lowfrequency telemetry signals through soils that are largely impenetrable by other electromagnetic waves.

  5. Jose f Regional Underground Research Centre: a new and attractive location for interdisciplinary teaching, research and training in the field of nuclear engineering

    International Nuclear Information System (INIS)

    Pacovsky, J.; Vasicek, R.

    2010-10-01

    The Jose f Gallery, located in the central Bohemia region of the Czech Republic (not far from the capital, Prague), was first excavated in 1981 as an exploration complex for the potential mining of gold. In 2007, the gallery was substantially reconstructed to house the Jose f Underground Educational Facility (Jose f UEF), which subsequently became an autonomous workplace under the direction of the Czech Technical University in Prague. At the beginning of 2010, the UEF was renamed the Jose f Regional Underground Research Centre (Jose f URC) which, along with the extensive underground complex, features modern above-ground facilities. One of the most important roles of this research centre is to provide practical -in situ- instruction in the fields of geotechnical engineering, geology, geochemistry, radiochemistry and radioecology. The training of future experts in this authentic underground setting involves the participation of several other Czech universities and numerous experienced specialists from outside the academic sphere. The IAEA has recently added the Jose f URC to its prestigious list of international training centres involved in the Training in and demonstration of waste disposal technologies in underground research facilities - A network of centres of excellence project. In addition to teaching and training, the Jose f URC is heavily involved in a wide range of research and development activities. The Jose f URC underground facilities are currently being used for research purposes as part of several European Union International experimental projects addressing various issues related to deep repository radioactive waste disposal (TIMODAZ - FP6, Forge - FP7, PETRUS II - FP7) as well as for hosting domestic projects supported by the Czech Ministry of Industry and Trade and the Czech Science Foundation. The Jose f URC is also working in close cooperation with the private construction sector providing practical training in underground construction

  6. Jose f Regional Underground Research Centre: a new and attractive location for interdisciplinary teaching, research and training in the field of nuclear engineering

    Energy Technology Data Exchange (ETDEWEB)

    Pacovsky, J.; Vasicek, R., E-mail: Pacovsky@fsv.cvut.c [Czech Technical University in Prague, Faculty of Civil Engineering, Centre of Experimental Geotechnics, Thakurova 7, 166-29 Prague 6 (Czech Republic)

    2010-10-15

    The Jose f Gallery, located in the central Bohemia region of the Czech Republic (not far from the capital, Prague), was first excavated in 1981 as an exploration complex for the potential mining of gold. In 2007, the gallery was substantially reconstructed to house the Jose f Underground Educational Facility (Jose f UEF), which subsequently became an autonomous workplace under the direction of the Czech Technical University in Prague. At the beginning of 2010, the UEF was renamed the Jose f Regional Underground Research Centre (Jose f URC) which, along with the extensive underground complex, features modern above-ground facilities. One of the most important roles of this research centre is to provide practical -in situ- instruction in the fields of geotechnical engineering, geology, geochemistry, radiochemistry and radioecology. The training of future experts in this authentic underground setting involves the participation of several other Czech universities and numerous experienced specialists from outside the academic sphere. The IAEA has recently added the Jose f URC to its prestigious list of international training centres involved in the Training in and demonstration of waste disposal technologies in underground research facilities - A network of centres of excellence project. In addition to teaching and training, the Jose f URC is heavily involved in a wide range of research and development activities. The Jose f URC underground facilities are currently being used for research purposes as part of several European Union International experimental projects addressing various issues related to deep repository radioactive waste disposal (TIMODAZ - FP6, Forge - FP7, PETRUS II - FP7) as well as for hosting domestic projects supported by the Czech Ministry of Industry and Trade and the Czech Science Foundation. The Jose f URC is also working in close cooperation with the private construction sector providing practical training in underground construction

  7. Development of digital photogrammetry for measurements of displacements in underground excavation

    International Nuclear Information System (INIS)

    Ohnishi, Yuzo; Ohtsu, Hiroyasu; Nishiyama, Satoshi; Ono, Tetsu; Matsui, Hiroya

    2002-03-01

    Because deformations are important indicators of the degree of stability during construction of rock structures, monitoring of deformation is a key element of construction of tunnels and structures for the underground research laboratory. Especially in the construction and maintenance of underground excavation, monitoring of deformations is needed for obtaining useful information to control its stability. We have been developing the application of digital photogrammetry to monitoring techniques in rock structures. Photogrammetric process has undergone a remarkable evolution with its transformation into digital photogrammetry. Photogrammetry has the advantage of measuring deformation of an object by some photos with easy measurements and excellent cost performance. In this paper, we present that the digital photogrammetry can monitor the displacements of the underground excavation accurately along with a capability of real-time measurement. (author)

  8. Problems of natural lighting for deepened buildings and underground premises under screen effect of high-rise construction

    Directory of Open Access Journals (Sweden)

    Larionova Kira

    2018-01-01

    Full Text Available The main rationale and objective of the submitted research work is to create a quality lighting environment in the premises of deepened buildings and below-ground structures under screen effect of high-rise construction (high-rise buildings. It is noted, that in modern megapolises, a deficiency of vacant urban territories leads to the increased density of urban development with increased amount of high-rise construction and tendency to increase efficiency in the use of underground space. The natural lighting of premises in underground buildings and structures is the most efficient way, but it can be implemented only under use of roof lighting system in the form of roof monitors or skylights. In this case the levels of indoor natural lighting will be affected with serious screening effect of high-rise buildings in surrounding development. Such an situation is not regulated, or even considered by the contemporary building Codes and Regulations on natural lighting of interiors. The authors offered a new formula for a daylight factor calculation with roof lighting system in the described cases. The results of theoretical calculations and experimental studies showed very similar values. This proved the truth of the offered formula and elaborated method of calculation on the basis of an offered hypothesis. It prooves, that it is possible to use some factor and guide points in the daylight factors design under system of side natural lighting in the same design for a system of roof lighting.

  9. Problems of natural lighting for deepened buildings and underground premises under screen effect of high-rise construction

    Science.gov (United States)

    Larionova, Kira; Stetsky, Sergey

    2018-03-01

    The main rationale and objective of the submitted research work is to create a quality lighting environment in the premises of deepened buildings and below-ground structures under screen effect of high-rise construction (high-rise buildings). It is noted, that in modern megapolises, a deficiency of vacant urban territories leads to the increased density of urban development with increased amount of high-rise construction and tendency to increase efficiency in the use of underground space. The natural lighting of premises in underground buildings and structures is the most efficient way, but it can be implemented only under use of roof lighting system in the form of roof monitors or skylights. In this case the levels of indoor natural lighting will be affected with serious screening effect of high-rise buildings in surrounding development. Such an situation is not regulated, or even considered by the contemporary building Codes and Regulations on natural lighting of interiors. The authors offered a new formula for a daylight factor calculation with roof lighting system in the described cases. The results of theoretical calculations and experimental studies showed very similar values. This proved the truth of the offered formula and elaborated method of calculation on the basis of an offered hypothesis. It prooves, that it is possible to use some factor and guide points in the daylight factors design under system of side natural lighting in the same design for a system of roof lighting.

  10. Seismic effects on bedrock and underground constructions. A literature survey of damage on constructions; Changes in groundwater levels and flow; Changes in chemistry in groundwater and gases

    International Nuclear Information System (INIS)

    Roeshoff, Kennert.

    1989-06-01

    This report is a literature review of direct and indirect effects of earthquakes on underground constructions as tunnels, caverns and mines. The direct damage will cause vibrations, shaking and displacement, which may lead to partial or total destruction of the underground facility. Damage caused by shaking has been reported in several studies, and several hundreds of events have been reported both from mines and tunnels. These reports are mainly from active earthquake areas. There are very few reports of damage caused by displacements on an existing fault. The damage, which may be severe, is generally concentrated to the vicinity of the fault zone. The report also includes a review of the effects caused by earthquakes on groundwater level, flow, pressure, chemistry and constituents in the ground. Such changes are mainly reported from studies in wells near active faults. The interesting coupling of changes in groundwater characteristics around an underground construction is, unfortunately, very seldom reported. The groundwater level and pressure changes are discussed in Chapter 4. The bases for this part of the review is taken from the Alaska earthquake 1964. Other observations are reported from wells and reservoirs located near existing faults. Changes of the geochemistry in groundwater and soil gases are reviewed in Chapter 4. The mechanisms of seismochemical anomalies are discussed and examples of short and long term monitoring are given from USA, Soviet Union and China. Gases in ground water and soil is reported in Chapter 5. Radon is so far one of the most studied species and its variation in short, medium and long term with seismic activity is rather well understood. Other gases or isotopes that have been studied include helium, carbon dioxide, hydrogen, argon and methane, radium and uranium. The paper also includes same statements for repository design based on the result of the review. (81 refs.)

  11. Key technologies and risk management of deep tunnel construction at Jinping II hydropower station

    Directory of Open Access Journals (Sweden)

    Chunsheng Zhang

    2016-08-01

    Full Text Available The four diversion tunnels at Jinping II hydropower station represent the deepest underground project yet conducted in China, with an overburden depth of 1500–2000 m and a maximum depth of 2525 m. The tunnel structure was subjected to a maximum external water pressure of 10.22 MPa and the maximum single-point groundwater inflow of 7.3 m3/s. The success of the project construction was related to numerous challenging issues such as the stability of the rock mass surrounding the deep tunnels, strong rockburst prevention and control, and the treatment of high-pressure, large-volume groundwater infiltration. During the construction period, a series of new technologies was developed for the purpose of risk control in the deep tunnel project. Nondestructive sampling and in-situ measurement technologies were employed to fully characterize the formation and development of excavation damaged zones (EDZs, and to evaluate the mechanical behaviors of deep rocks. The time effect of marble fracture propagation, the brittle–ductile–plastic transition of marble, and the temporal development of rock mass fracture and damage induced by high geostress were characterized. The safe construction of deep tunnels was achieved under a high risk of strong rockburst using active measures, a support system comprised of lining, grouting, and external water pressure reduction techniques that addressed the coupled effect of high geostress, high external water pressure, and a comprehensive early-warning system. A complete set of technologies for the treatment of high-pressure and large-volume groundwater infiltration was developed. Monitoring results indicated that the Jinping II hydropower station has been generally stable since it was put into operation in 2014.

  12. The exergy underground coal gasification technology for power generation and chemical applications

    Energy Technology Data Exchange (ETDEWEB)

    Blinderman, M.S. [Ergo Exergy Technologies Inc., Montreal, PQ (Canada)

    2006-07-01

    Underground coal gasification (UCG) is a gasification process carried out in non-mined coal seams using injection and production wells drilled from the surface, converting coal in situ into a product gas usable for chemical processes and power generation. The UCG process developed, refined and practised by Ergo Exergy Technologies is called the Exergy UCG Technology or {epsilon}UCG{trademark} technology. This paper describes the technology and its applications. The {epsilon}UCG technology is being applied in numerous power generation and chemical projects worldwide, some of which are described. These include power projects in South Africa, India, Pakistan and Canada, as well as chemical projects in Australia and Canada. A number of {epsilon}UCG{trademark} based industrial projects are now at a feasibility usage in India, New Zealand, USA and Europe. An {epsilon}UCG{trademark} IGCC power plant will generate electricity at a much lower cost than existing fossil fuel power plants. CO{sub 2} emissions of the plant can be reduced to a level 55% less than those of a supercritical coal-fired plant and 25% less than the emissions of NG CC. 10 refs., 8 figs.

  13. AECL's underground research laboratory: technical achievements and lessons learned

    International Nuclear Information System (INIS)

    Ohta, M.M.; Chandler, N.A.

    1997-03-01

    During the development of the research program for the Canadian Nuclear Fuel Waste Management Program in the 1970's, the need for an underground facility was recognized. AECL constructed an Underground Research Laboratory (URL) for large-scale testing and in situ engineering and performance-assessment-related experiments on key aspects of deep geological disposal in a representative geological environment. Ale URL is a unique geotechnical research and development facility because it was constructed in a previously undisturbed portion of a granitic pluton that was well characterized before construction began, and because most of the shaft and experimental areas are below the water table. The specific areas of research, development and demonstration include surface and underground characterization; groundwater and solute transport; in situ rock stress conditions; temperature and time-dependent deformation and failure characteristics of rock; excavation techniques to minimize damage to surrounding rock and to ensure safe working conditions; and the performance of seals and backfills. This report traces the evolution of the URL and summarizes the technical achievements and lessons learned during its siting, design and construction, and operating phases over the last 18 years. (author)

  14. New technologies in Islamic countries. Power engineering, transport, oil industry, machinery construction, building construction and information technologies problems

    International Nuclear Information System (INIS)

    Sharipova, N.S.

    1999-01-01

    The published proceedings contain brief presentations concerning new technologies in power engineering, transport, oil industry, machinery construction, building construction and information technologies presented to the International scientific and technical conference: New technologies in Islamic countries, which was organized within frame work of 6 General Assembly of Federation of engineering Institutes of Islamic countries (FEIIC). (author)

  15. Study on construction method of concrete in the underground research laboratory. 3

    International Nuclear Information System (INIS)

    Iriya, Keishiro; Mikami, Tetsuji; Takeda, Nobufumi; Akiyoshi, Kenji

    2003-02-01

    The Horonobe underground research laboratory project doesn't carry on only safety assessment study but also demonstration of construction technique upon nuclear waste repositories. Low alkalinity cement is one of candidates for engineered barrier in order to prevent alteration of bentonite and rock by hyper alkaline solution. JNC has developed low alkalinity cement (HFSC) which contains a lot of fly ash, and has studied the physical and chemical properties by laboratory test. Effect on variety of quality of fly ash and monitoring corrosion of rebars in off-shore condition has been studied. In-situ test for actual use of HFSC in constructing the facility was planned. The results are summarized as below. Effects of variety of flay ash upon lower pH are relatively small by testing two type of fly ash and several fly as content. Variety of fly ash effects properties of fresh concrete but its effect is not significant. And it little effects on mechanical behavior. However, it doesn't effect on properties of shotcrete. Although rebars corrode in HFSC in spite of no intrusion of chloride, increment of corrosion is not significant in half an year until an year. Applicability for structural members is demonstrated by loading test of tunnel concrete segments of HFSC. Pre-mixed HFSC can be supplied by mixing fly ash and silica fume in Sapporo and carry to Horonobe by cement truck. (author)

  16. The Use of Underground Research Laboratories to Support Repository Development Programs. A Roadmap for the Underground Research Facilities Network.

    Energy Technology Data Exchange (ETDEWEB)

    MacKinnon, Robert J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-10-26

    Under the auspices of the International Atomic Energy Agency (IAEA), nationally developed underground research laboratories (URLs) and associated research institutions are being offered for use by other nations. These facilities form an Underground Research Facilities (URF) Network for training in and demonstration of waste disposal technologies and the sharing of knowledge and experience related to geologic repository development, research, and engineering. In order to achieve its objectives, the URF Network regularly sponsors workshops and training events related to the knowledge base that is transferable between existing URL programs and to nations with an interest in developing a new URL. This report describes the role of URLs in the context of a general timeline for repository development. This description includes identification of key phases and activities that contribute to repository development as a repository program evolves from an early research and development phase to later phases such as construction, operations, and closure. This information is cast in the form of a matrix with the entries in this matrix forming the basis of the URF Network roadmap that will be used to identify and plan future workshops and training events.

  17. New technologies in Islamic countries. Power engineering, transport, oil industry, machinery construction, building construction and information technologies problems

    International Nuclear Information System (INIS)

    Sharipova, N.S.

    1999-01-01

    This issue contains papers, which reflect the most important achievements of new technologies in power engineering, transport, oil industry, machinery construction, building construction and information technologies presented to the International Scientific and Technical Conference: New technologies in Islamic countries, which was organized within frame work of 6 General Assembly of Federation of Engineering Institutes of Islamic Countries (FEIIC). (author)

  18. Mizunami Underground Research Laboratory Project. Annual report for fiscal year 2015

    International Nuclear Information System (INIS)

    Hama, Katsuhiro; Iwatsuki, Teruki; Matsui, Hiroya; Mikake, Shinichiro; Ishibashi, Masayuki; Onoe, Hironori; Takeuchi, Ryuji; Nohara, Tsuyoshi; Sasao, Eiji; Ikeda, Koki; Koide, Kaoru

    2016-12-01

    The Mizunami Underground Research Laboratory (MIU) project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of geological disposal technologies through investigations of the deep geological environment in the crystalline host rock (granite) at Mizunami City in Gifu Prefecture, central Japan. On the occasion of the research program and management system revision of the entire JAEA organization in 2014, JAEA identified three important issues on the geoscientific research program: 'Development of countermeasure technologies for reducing groundwater inflow', 'Development of modeling technologies for mass transport' and 'Development of drift backfilling technologies', based on the latest results of the synthesizing research and development (R and D). The R and D on three important issues has been carrying out on the MIU project. In this report, the current status of R and D activities and construction in 2015 is summarized. (author)

  19. Underground siting of nuclear power plants: potential benefits and penalties

    International Nuclear Information System (INIS)

    Allensworth, J.A.; Finger, J.T.; Milloy, J.A.; Murfin, W.B.; Rodeman, R.; Vandevender, S.G.

    1977-08-01

    The potential for improving nuclear power safety is analyzed by siting plants underground in mined cavities or by covering plants with fill earth after construction in an excavated cut. Potential benefits and penalties of underground plants are referenced to analogous plants located on the surface. Three representative regional sites having requisite underground geology were used to evaluate underground siting. The major factors which were evaluated for all three sites were: (1) containment of radioactive materials, (2) transport of groundwater contamination, and (3) seismic vulnerability. External protection, plant security, feasibility, operational considerations, and cost were evaluated on a generic basis. Additionally, the national availability of sites having the requisite geology for both underground siting concepts was determined

  20. Underground gasification and combustion brown with the use of groundwater

    Directory of Open Access Journals (Sweden)

    Zholudyev S.V.

    2011-11-01

    Full Text Available The problems of coal excavation and environement protection are priority for Ukraine. Underground coal gasification (UCG and underground coal incineration (UCI are combining excavation with simultaneous underground processing in entire technological process, capable to solve this problem. Using an intermediate heat carrier - ground water may optimisating of these processes.

  1. Going Underground in Singapore

    CERN Multimedia

    John Osborne (GS/SEM)

    2010-01-01

    Singapore has plans to build a massive Underground Science City (USC) housing R&D laboratories and IT data centres. A delegation involved in the planning to build the subterranean complex visited CERN on 18 October 2010 to learn from civil engineers and safety experts about how CERN plans and constructs its underground facilities.   The delegation from Singapore. The various bodies and corporations working on the USC project are currently studying the feasibility of constructing up to 40 caverns (60 m below ground) similar in size to an LHC experiment hall, in a similar type of rock. Civil engineering and geotechnical experts are calculating the maximum size of the cavern complex that can be safely built. The complex could one day accommodate between 3000 and 5000 workers on a daily basis, so typical issues of size and number of access shafts need to be carefully studied. At first glance, you might not think the LHC has much in common with the USC project; as Rolf Heuer pointed out: &ldq...

  2. Constructive Technology Assessmentand Technology Dynamics. The Case of Clean Technologies

    NARCIS (Netherlands)

    Schot, Johan

    1992-01-01

    A synthesis of neo-Schumpeterian evolutionary, sociological, and historical coevolution ary models could be used for constructive technology assessment, aimed at the active management of the process of technological change. This article proposes a synthetic quasi-evolutionary model, in which

  3. Assessment of the mechanical stability of underground excavations

    International Nuclear Information System (INIS)

    Kuroki, Shigemori; Taniguchi, Wataru

    1999-01-01

    Each tunnel in the underground high level radioactive waste repository must be mechanically stable to maintain safety throughout the construction, emplacement operations and closure phase. The mechanical stability of underground excavations were assessed using a theoretical analysis and a finite element method taking a wide range of geological environment in Japan into consideration to establish confidence in the construction of disposal facilities. The results show that it is possible to maintain the mechanical stability with adequate tunnel spacing and disposal pit pitch and proper mechanical support. The procedure used for the analysis of the mechanical stability in the H12 report and the results are described in this report. (author)

  4. Development of road hydronic snow-ice melting system with solar energy and seasonal underground thermal energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Gao, Q.; Liu, Y.; Ma, C.Q.; Li, M.; Huang, Y.; Yu, M. [Jilin Univ., Changchun (China). Dept. of Thermal Energy Engineering; Liu, X.B. [Climate Master Inc., OK (United States)

    2008-07-01

    Snow and ice melting technologies that used thermal energy storage were explored. The study included analyses of solar heat slab, seasonal underground thermal energy storage, and embedded pipe technologies. Different road materials, roadbed construction methods, and underground rock and soil conditions were also discussed. New processes combining all 3 of the main technologies were also reviewed. Other thermal ice melting technologies included conductive concrete and asphalt; heating cables, and hydronic melting systems. Geothermal energy is increasingly being considered as a means of melting snow and ice from roads and other infrastructure. Researchers have also been focusing on simulating heat transfer in solar collectors and road-embedded pipes. Demonstration projects in Japan, Switzerland, and Poland are exploring the use of combined geothermal and solar energy processes to remove snow and ice from roads. Research on hydronic melting technologies is also being conducted in the United States. The study demonstrated that snow-ice melting energy storage systems will become an important and sustainable method of snow and ice removal in the future. The technology efficiently uses renewable energy sources, and provides a cost-effective means of replacing or reducing chemical melting agents. 33 refs., 1 fig.

  5. Welcome to USA 15, the first large underground hall for the LHC

    CERN Multimedia

    2001-01-01

    The first of the four huge underground halls for LHC is ready. USA 15 will be the service hall for ATLAS. It has taken three years to finish the first underground hall for LHC. It is 62 metres long and 20 metres diameter. USA 15 could be called the 'new world' for LHC construction. Although the acronym has nothing to do with the United States. In the terminology of the underground construction for the future accelerator, USA stands for Underground Service ATLAS. This is the first of the four big underground halls for LHC to be finished. Wednesday 8 August, it was officially handed over to the ST division by the collaboration of contractors and consultants who carried out the work. These are CCC (CERN civil contractors) composed of the companies Porr-Asdag (Austria), Baresel (Germany) and Zschokke-Locher (Switzerland) and the consultant EDF-KP composed of EDF (France) and Knight and Piésold (United Kingdom). For three years these firms excavated and concreted the undergro...

  6. THE SIGNIFICANCE OF STRUCTURAL AND GEOLOGICAL RELATIONSHIP ASSESSMENT IN THE CONSTRUCTION OF THE OMBLA UNDERGROUND HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Renato Buljan

    1997-12-01

    Full Text Available The construction design of the underground hydroelectric plant Ombla required geological and structural investigations to he carried out. Due to past earthquakes in the area permanent tectonic movements were inferred. Therefore, in the wider and adjacent surroundings of the Ombla spring it was necessary to analyze the structural fabric and the geodynamic characteristics of the area. The most active zone encountered is the front part of a thrust fault belonging to the Dinaricum regional structural unit. The compressive regime is maintained as a response to the regional stress of an approximately S-N orientation. Different displacements of various parts of the Dinaricum unit are present. Along the rim of the structural blocks, the Hum-Om-bla fault zone extends, accompanied by left transcurrent faults, Through this zone the main groundwater drainage occurs supplying the Ombla spring. In the local Ombla spring area this zone is characterized by three sub-blocks and three major faults. The most important fault for the vital facilities of the Ombla hydroelectric power plant is the Pločice fault which divides the structural sub-blocks. Along this fault zone there are four mutually connected. The lowest two arc active groundwater draining systems supplying the Ombla spring. The data on local stress implies the following deformation of sub-blocks: sub-blocks 2c and 2f are displaced along normal faults from 20° to 30° to the left, downwards, while the sub-block 2 d is displaced along the Pločice thrust fault of 100° to 130° to the left, upwards. The structural data confirmed that the building of an underground dam with a height from 100 to 130 m was feasible. The connection between the caverns and the fault zone was determined. The unfavorable position of the active Pločice fault zone imposes the construction of vital Ombla power plant facilities underground.

  7. Current status of the Demonstration Test of Underground Cavern-Type Disposal Facilities

    International Nuclear Information System (INIS)

    Akiyama, Yoshihiro; Terada, Kenji; Oda, Nobuaki; Yada, Tsutomu; Nakajima, Takahiro

    2011-01-01

    In Japan, the underground cavern-type disposal facilities for low-level waste (LLW) with relatively high radioactivity, mainly generated from power reactor decommissioning, and for certain transuranic (TRU) waste, mainly from spent fuel reprocessing, are designed to be constructed in a cavern 50-100 m underground and to employ an engineered barrier system (EBS) made of bentonite and cement materials. To advance a disposal feasibility study, the Japanese government commissioned the Demonstration Test of Underground Cavern-Type Disposal Facilities in fiscal year (FY) 2005. Construction of a full-scale mock-up test facility in an actual subsurface environment started in FY 2007. The main test objective is to establish the construction methodology and procedures that ensure the required quality of the EBS on-site. A portion of the facility was constructed by 2010, and the test has demonstrated both the practicability of the construction and the achievement of quality standards: low permeability of less than 5x10 -13 m/s and low-diffusion of less than 1x10 -12 m 2 /s at the completion of construction. This paper covers the test results from the construction of certain parts using bentonite and cement materials. (author)

  8. War protected underground siting of nuclear power plants -a summary

    International Nuclear Information System (INIS)

    1974-06-01

    In connection with studies concerning the need of war protected nuclear power production the technical and economical conditions with war protection of nuclear power plants have been studied within CDL. Comprehensively one have shown that no technical construction obstacles for siting a nuclear power plant underground exist that the additional costs for underground siting with price level mid 1973 are some 175-250 MSwCr (In today's price level 250 MSwCr will probably correspond to some 300 MSwCr per unit) and that the construction time is some one year longer than for an above ground plant. A study ought to examine more closely the consequences of underground siting from a radiological point of view and what demands on that occasion ought to be put on the technical design. (author)

  9. Magneto-Inductive Underground Communications in a District Heating System

    DEFF Research Database (Denmark)

    Meybodi, Soroush Afkhami; Nielsen, Jens Frederik Dalsgaard; Bendtsen, Jan Dimon

    2011-01-01

    Feasibility of underground data communications is investigated by employing magnetic induction as the key technology at physical layer. Realizing an underground wireless sensor network for a district heating plant motivates this research problem. The main contribution of the paper is to find the ...

  10. Radionuclide behavior at underground environment

    International Nuclear Information System (INIS)

    Hahn, Phil Soo; Park, Chung Kyun; Keum, Dong Kwon; Cho, Young Hwan; Kang, Moon Ja; Baik, Min Hoon; Hahn, Kyung Won; Chun, Kwan Sik; Park, Hyun Soo

    2000-03-01

    This study of radionuclide behavior at underground environment has been carried out as a part of the study of high-level waste disposal technology development. Therefore, the main objectives of this project are constructing a data-base and producing data for the safety assessment of a high-level radioactive waste, and verification of the objectivity of the assessment through characterization of the geochemical processes and experimental validation of the radionuclide migration. The various results from the this project can be applicable to the preliminary safety and performance assessments of the established disposal concept for a future high-level radioactive waste repository. Providing required data and technical basis for assessment methodologies could be a direct application of the results. In a long-term view, the results can also be utilized as a technical background for the establishment of government policy for high-level radioactive waste disposal

  11. Radionuclide behavior at underground environment

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, Phil Soo; Park, Chung Kyun; Keum, Dong Kwon; Cho, Young Hwan; Kang, Moon Ja; Baik, Min Hoon; Hahn, Kyung Won; Chun, Kwan Sik; Park, Hyun Soo

    2000-03-01

    This study of radionuclide behavior at underground environment has been carried out as a part of the study of high-level waste disposal technology development. Therefore, the main objectives of this project are constructing a data-base and producing data for the safety assessment of a high-level radioactive waste, and verification of the objectivity of the assessment through characterization of the geochemical processes and experimental validation of the radionuclide migration. The various results from the this project can be applicable to the preliminary safety and performance assessments of the established disposal concept for a future high-level radioactive waste repository. Providing required data and technical basis for assessment methodologies could be a direct application of the results. In a long-term view, the results can also be utilized as a technical background for the establishment of government policy for high-level radioactive waste disposal.

  12. Research methods of the parameters of residential buildings construction

    Directory of Open Access Journals (Sweden)

    Grigor’ev Vladimir Aleksandrovich

    Full Text Available The analysis of construction theory and practice shows that rational organizational and technological parameters of the construction of residential buildings should be based on the manifestation in time and space of the most important stages construction with their harmonization. Basing on the experience of normalizing the construction duration, it is advisable to express the complex of residential buildings’ construction processes by their basic stages - preparatory period, underground part, aboveground part, external engineering networks and land improvement. The main indicators of the development and implementation of optimization solutions are: the total duration of the construction, the duration of the preparation period, the duration of the construction of the underground part, the duration of the construction of the aboveground part, the duration of external engineering networks laying, the duration of land improvement. The indicators of the total duration of the construction of residential buildings, the construction the underground and aboveground parts are determined on the basis of the operation of one assembly crane on an object of up to four sections. In case of more sections two (three cranes are considered and the total construction duration is set depending on these conditions. The duration of the construction of multisectional buildings is determined basing on the simultaneous construction of the stages or their combination with a certain time shift. However, this approach requires a significant amount of optimization solutions due to its multivariance. Therefore, in order to reduce the volume of calculations in some cases, for example, when planning the development of districts and neighborhoods, statistical methods can be used for determining the duration of the construction basing on the compilation of optimization solutions. The total duration of the construction and the duration of the main stages are multiple

  13. Integrated construction management technology for power plants

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko

    2003-01-01

    The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)

  14. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    Science.gov (United States)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  15. Underground structure pattern and multi AO reaction with step feed concept for upgrading an large wastewater treatment plant

    Science.gov (United States)

    Peng, Yi; Zhang, Jie; Li, Dong

    2018-03-01

    A large wastewater treatment plant (WWTP) could not meet the new demand of urban environment and the need of reclaimed water in China, using a US treatment technology. Thus a multi AO reaction process (Anaerobic/oxic/anoxic/oxic/anoxic/oxic) WWTP with underground structure was proposed to carry out the upgrade project. Four main new technologies were applied: (1) multi AO reaction with step feed technology; (2) deodorization; (3) new energy-saving technology such as water resource heat pump and optical fiber lighting system; (4) dependable old WWTP’s water quality support measurement during new WWTP’s construction. After construction, upgrading WWTP had saved two thirds land occupation, increased 80% treatment capacity and improved effluent standard by more than two times. Moreover, it had become a benchmark of an ecological negative capital changing to a positive capital.

  16. Study of a pipe-scanning robot for use in post-construction evaluation during horizontal directional drilling.

    Science.gov (United States)

    2015-06-01

    Trenchless Technology has become an increasingly popular underground utility construction method, beginning in : the early 1900s with pipe jacking beneath railroad lines. One method, horizontal directional drilling (HDD), became : more common in the ...

  17. Underground Facilities, Technological Challenges

    CERN Document Server

    Spooner, N

    2010-01-01

    This report gives a summary overview of the status of international under- ground facilities, in particular as relevant to long-baseline neutrino physics and neutrino astrophysics. The emphasis is on the technical feasibility aspects of creating the large underground infrastructures that will be needed in the fu- ture to house the necessary detectors of 100 kton to 1000 kton scale. There is great potential in Europe to build such a facility, both from the technical point of view and because Europe has a large concentration of the necessary engi- neering and geophysics expertise. The new LAGUNA collaboration has made rapid progress in determining the feasibility for a European site for such a large detector. It is becoming clear in fact that several locations are technically fea- sible in Europe. Combining this with the possibility of a new neutrino beam from CERN suggests a great opportunity for Europe to become the leading centre of neutrino studies, combining both neutrino astrophysics and neutrino beam stu...

  18. Vitrification of underground storage tanks: Technology development, regulatory issues, and cost analysis

    International Nuclear Information System (INIS)

    Tixier, J.S.; Corathers, L.A.; Anderson, L.D.

    1992-03-01

    In situ vitrification (ISV), developed by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE), is a thermal treatment process for the remediation of hazardous, radioactive, or mixed waste sites. The process has been broadly patented both domestically and abroad. Since the inception of ISV in 1980, developmental activities have been focused on applications to contaminated soils, and more recently the potential for application to buried wastes and underground structures (tanks). Research performed to date on the more advanced ISV applications (i.e., application to buried wastes and underground tanks) shows that significant technical and economic potential exists for using ISV to treat buried wastes and underground structures containing radionuclides and/or hazardous constituents. Present ISV applications are directed to the treatment of contaminated soils; the likelihood of using ISV to treat underground tanks depends on the resolution of significant technical and institutional issues related to this advanced application. This paper describes the ISV process and summarizes the technical progress of underground tank vitrification (UTV), discusses pertinent regulatory issues facing the use of UTV, and presents the potential cost of UTV relative to other remedial action alternatives

  19. An Underground Storage Tank Integrated Demonstration report

    International Nuclear Information System (INIS)

    Quadrel, M.J.; Hunter, V.L.; Young, J.K.; Lini, D.C.; Goldberg, C.

    1993-04-01

    The Waste Characterization Data and Technology Development Needs Assessment provides direct support to the Underground Storage Tank Integrated Demonstration (UST-ID). Key users of the study's products may also include individuals and programs within the US Department of Energy (DOE) Office of Technology Development (EM-50), the Office of Waste Operations (EM-30), and the Office of Environmental Restoration (EM-40). The goal of this work is to provide the UST-ID with a procedure for allocating funds across competing characterization technologies in a timely and defensible manner. It resulted in three primary products: 1. It organizes and summarizes information on underground storage tank characterization data needs. 2. It describes current technology development activity related to each need and flags areas where technology development may be beneficial. 3. It presents a decision process, with supporting software, for evaluating, prioritizing, and integrating possible technology development funding packages. The data presented in this document can be readily updated as the needs of the Waste Operations and Environmental Restoration programs mature and as new and promising technology development options emerge

  20. Waste disposal in underground mines -- A technology partnership to protect the environment

    International Nuclear Information System (INIS)

    1995-01-01

    Environmentally compatible disposal sites must be found despite all efforts to avoid and reduce the generation of dangerous waste. Deep geologic disposal provides the logical solution as ever more categories of waste are barred from long-term disposal in near-surface sites through regulation and litigation. Past mining in the US has left in its wake large volumes of suitable underground space. EPA studies and foreign practice have demonstrated deep geologic disposal in mines to be rational and viable. In the US, where much of the mined underground space is located on public lands, disposal in mines would also serve the goal of multiple use. It is only logical to return the residues of materials mined from the underground to their origin. Therefore, disposal of dangerous wastes in mined underground openings constitutes a perfect match between mining and the protection and enhancement of the environment

  1. Reflection Phenomena in Underground Pumped Storage Reservoirs

    Directory of Open Access Journals (Sweden)

    Elena Pummer

    2018-04-01

    Full Text Available Energy storage through hydropower leads to free surface water waves in the connected reservoirs. The reason for this is the movement of water between reservoirs at different elevations, which is necessary for electrical energy storage. Currently, the expansion of renewable energies requires the development of fast and flexible energy storage systems, of which classical pumped storage plants are the only technically proven and cost-effective technology and are the most used. Instead of classical pumped storage plants, where reservoirs are located on the surface, underground pumped storage plants with subsurface reservoirs could be an alternative. They are independent of topography and have a low surface area requirement. This can be a great advantage for energy storage expansion in case of environmental issues, residents’ concerns and an unusable terrain surface. However, the reservoirs of underground pumped storage plants differ in design from classical ones for stability and space reasons. The hydraulic design is essential to ensure their satisfactory hydraulic performance. The paper presents a hybrid model study, which is defined here as a combination of physical and numerical modelling to use the advantages and to compensate for the disadvantages of the respective methods. It shows the analysis of waves in ventilated underground reservoir systems with a great length to height ratio, considering new operational aspects from energy supply systems with a great percentage of renewable energies. The multifaceted and narrow design of the reservoirs leads to complex free surface flows; for example, undular and breaking bores arise. The results show excessive wave heights through wave reflections, caused by the impermeable reservoir boundaries. Hence, their knowledge is essential for a successful operational and constructive design of the reservoirs.

  2. Potential Advantages of Underground Nuclear Parks

    International Nuclear Information System (INIS)

    Myers, Carl W.; Elkins, Ned Z.; Kunze, Jay F.; Mahar, James M.

    2006-01-01

    In this paper we argue that an underground nuclear park (UNP) could potentially lead to lower capital and operating cost for the reactors installed in the UNP compared to the traditional approach, which would be to site the reactors at the earth's surface at distributed locations. The UNP approach could also lead to lower waste management cost. A secondary benefit would be the increased margins of safety and security that would be realized simply as a consequence of siting the reactors underground. Lowered capital and operating cost for a UNP relative to traditional reactor siting is possible through the aggregate effect of the elimination of containment structures, in-place decommissioning, reduced physical security costs, reduced weather-related costs, reduced cost of liability insurance and reduced unit-cost for the nth reactor made possible through the continuous construction of multiple reactors at the same underground location. Other cost reductions might be possible through the transfer of the capital cost for part of the underground construction from the reactor owners to the owners of the UNP. Lower waste management cost is possible by siting the UNP at a location where there are geological and hydrological conditions suitable for hosting both the reactors and the repository for the waste from those reactors. After adequate storage and cooling, and assuming direct disposal, this would enable the spent fuel from the reactors to be transported directly to the repository and remain entirely underground during the transport process. Community concerns and transportation costs would be significantly reduced relative to current situations where the reactors are separated from the repository by long distances and populated areas. The concept for a UNP in bedded salt is used to develop a rough order of magnitude cost estimate for excavation of the reactor array portion of a UNP. Excavation costs appear to be only a small fraction of the overall power plant costs

  3. Horonobe Underground Research Laboratory project. Investigation report for the 2006 fiscal year

    International Nuclear Information System (INIS)

    Matsui, Hiroya; Nakayama, Masashi; Sanada, Hiroyuki

    2008-05-01

    The Horonobe Underground Research Laboratory is planned to extend over a period of 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction Phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the results of the investigations for the 2006 fiscal year (2006/2007), the second year of the Phase 2 investigations. The investigations, which are composed of 'Geoscientific research' and 'R and D on the geological disposal of high-level radioactive waste (HLW)', were carried out according to 'Horonobe Underground Research Laboratory Project Investigation Program for the 2006 Fiscal Year'. The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. JAEA proceeded with the project in, collaboration with experts from domestic and overseas research organisation. (author)

  4. Horonobe Underground Research Laboratory project. Investigation report for the 2007 fiscal year

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sanada, Hiroyuki; Sugita, Yutaka

    2008-09-01

    The Horonobe Underground Research Laboratory Project is planned to extend over a period of 20 years. The investigations will be conducted in three phases, namely 'Phase 1: Surface-based investigations', 'Phase 2: Construction Phase' (investigations during construction of the underground facilities) and 'Phase 3: Operation phase' (research in the underground facilities). This report summarizes the results of the investigations for the 2007 fiscal year (2007/2008), the 3rd year of the Phase 2 investigations. The investigations, which are composed of 'Geoscientific research' and 'R and D on the geological disposal of high-level radioactive waste (HLW)', were carried out according to 'Horonobe Underground Research Laboratory Project Investigation Program for the 2007 Fiscal Year'. The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. JAEA proceeded with the project in collaboration with experts from domestic and overseas research organisation. (author)

  5. Union of the potential academic science and leading specialized universities for provision of the underground space effective development

    Directory of Open Access Journals (Sweden)

    Vartanov Aleksandr Zarairovich

    2018-03-01

    Full Text Available Subject of research: providing of enabling environment through the use of underground subsurface resources for the purposes of civil construction is the main trend of the modern development of society. Large-scale development of the megacities subsoils and urban-industrial agglomerations faces significant threats caused by the risks of the consequences of techno-genic impact on the rock massif of urbanized areas, which requires the use of special construction geotechnologies and construction specialists of appropriate qualifications. Objectives: for efficient development of underground space, it is necessary to solve problems at the junction of construction and mining sciences with the formation of a modern system of scientific and methodological support for the training of personnel in this field. It is necessary to use the scientific, educational, innovative and intellectual potential of academic science and national research universities most fully and effectively. Materials and methods: proceeding from the necessity of convergence of science and education, with the goal of integrating efforts and improving the efficiency of scientific research and educational activities aimed at the Russian mining and construction industry effective development providing, the Moscow State University of Civil Engineering and the Institute for Complex Development of Mineral Resources of the Russian Academy of Sciences created the basic department “Development of Underground Spaces”. Results and conclusions: the conducted complex of organizational and management measures, taking into account the potential of leading scientific and educational schools, has made it possible to form the basis for the development of the competencies of future engineers-constructors and highly qualified personnel (masters, candidates and doctors of sciences in the field of construction geo-technologies, which will be responsible for effective and safe development of megacities

  6. Mechanisation and automation technologies development in work at construction sites

    Science.gov (United States)

    Sobotka, A.; Pacewicz, K.

    2017-10-01

    Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.

  7. Design Criteria for Wireless Mesh Communications in Underground Coal Mines

    OpenAIRE

    Griffin, Kenneth Reed

    2009-01-01

    The Mine Improvement and New Emergency Response (MINER) Act of 2006 was enacted in response to several coal mining accidents that occurred in the beginning of 2006. The MINER Act does not just require underground mines to integrate wireless communication and tracking systems, but aims to overall enhance health and safety in mining at both surface and underground operations. In 2006, the underground communication technologies available to the mining industry had inherent problems that limited ...

  8. Modularization Technology in Power Plant Construction

    International Nuclear Information System (INIS)

    Kenji Akagi; Kouichi Murayama; Miki Yoshida; Junichi Kawahata

    2002-01-01

    Since the early 1980's, Hitachi has been developing and applying modularization technology to domestic nuclear power plant construction, and has achieved great rationalization. Modularization is one of the plant construction techniques which enables us to reduce site labor by pre-assembling components like equipment, pipes, valves and platforms in congested areas and installing them using large capacity cranes for cost reduction, better quality, safety improvement and shortening of construction time. In this paper, Hitachi's modularization technologies are described especially from with respect to their sophisticated design capabilities. The application of 3D-CAD at the detailed layout design stage, concurrent design environment achieved by the computer network, module design quantity control and the management system are described. (authors)

  9. Assessment of underground water potential zones using modern geomatics technologies in Jhansi district, Uttar Pradesh, India.

    Science.gov (United States)

    Pandey, N. K.; Shukla, A. K.; Shukla, S.; Pandey, M.

    2014-11-01

    Ground water is a distinguished component of the hydrologic cycle. Surface water storage and ground water withdrawal are traditional engineering approaches which will continue to be followed in the future. The uncertainty about the occurrence, distribution and quality aspect of the ground water and the energy requirement for its withdrawal impose restriction on exploitation of ground water. The main objective of the study is assessment of underground water potential zones of Jhansi city and surrounding area, by preparing underground water potential zone map using Geographical Information System (GIS), remote sensing, and validation by underground water inventory mapping using GPS field survey done along the parts of National Highway 25 and 26 and some state highway passing through the study area. Study area covers an area of 1401 km2 and its perimeter is approximate 425 km. For this study Landsat TM (0.76-0.90 um) band data were acquired from GLCF website. Sensor spatial resolution is 30 m. Satellite image has become a standard tool aiding in the study of underground water. Extraction of different thematic layers like Land Use Land Cover (LULC), settlement, etc. can be done through unsupervised classification. The modern geometics technologies viz. remote sensing and GIS are used to produce the map that classifies the groundwater potential zone to a number of qualitative zone such as very high, high, moderate, low or very low. Thematic maps are prepared by visual interpretation of Survey of India topo-sheets and linearly enhanced Landsat TM satellite image on 1 : 50,000 scale using AutoCAD, ArcGIS 10.1 and ERDAS 11 software packages.

  10. A basic study on underground storage of LNG

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Min-Kyu; Lee, Kyung-Han; Kang, Sun-Duck [Korea Institute of Geology Mining and Materials, Taejon (KR)] (and others)

    1999-12-01

    In 1997, import of LNG was 11,378 thousand of about 2.3 billion US dollars. The demand of LNG(Liquefied Natural Gas) in Korea has been increased since 1987 with the rate of 20% annually. It is also estimated that this trend will be continued until 2010. Long-term estimation says that demand will increase with 9.1% and total demand of 2010 will be 23 million ton that is four times larger than that of 1994. Bases of unloading and store of LNG is necessary to complete the network of LNG distribution system to cover all of the country from import to final supply terminal at home. The construction plan of LNG bases with 49 tanks was published and is going on now at three bases, Pyungtaek, Incheon and Tongyoung. The total cost for this construction will be over 5,400 billion Won. All the LNG tanks are planned to build on the surface. The construction of LNG tanks on the surfaces is conventional but it damage the surface green area and is very vulnerable on safety, especially in Korea Peninsula with potentially unstable of military confrontation. And Korea is so small and limited in available land that it is not easy to find proper places for construction of more LNG tanks on surface. Underground LNG stores in rock will be a good alternative for tanks on surface in the view points of environmental and safety. It is also reported that it can be cheaper than that of on surfaces. It is well known that bed rocks in Korea is good to build underground structure like LNG stores. This report is basic research to seek for the possibility of LNG store construction in underground rocks. The important two questions on it is that whether it is possible technically and economically or not. The technical focus in this report is the stability of underground cavern for storage of LNG, energy conservation in operation, tightness against leakage of stored gas to surface and safety. Some statistic on LNG in Korea is given for this study with its future. (author). 25 refs., 36 tabs., 88 figs.

  11. GPS-deprived localisation for underground mines

    CSIR Research Space (South Africa)

    Hlophe, K

    2010-08-31

    Full Text Available robots. Opencast mines utilise the global positioning system (GPS) to obtain location information. The unavailability of this technology in underground mining has actuated numerous researchers to investigate possible alternatives. These attempts exploit...

  12. Shaft extension design at the Underground Research Laboratory, Pinawa, Manitoba

    International Nuclear Information System (INIS)

    Kuzyk, G.W.; Ball, A.E.

    1991-01-01

    AECL Research has constructed an underground laboratory for the research and development required for the Canadian Nuclear Fuel Waste Management Program. The experimental program in the laboratory will contribute to the assessment of the feasibility and safety of nuclear fuel waste disposal deep in stable plutonic rock. In 1988, AECL extended the shaft of the Underground Research Laboratory (URL) from the existing 255 m depth to a depth of 443 m in cooperation with the United States Department of Energy. The project, which involved carrying out research activities while excavation and construction work was in progress, required careful planning. To accommodate the research programs, full-face blasting with a burn cut was used to advance the shaft. Existing facilities at the URL had to be modified to accommodate an expanded underground facility at a new depth. This paper discusses the design criteria, shaft-sinking methods and approaches used to accommodate the research work during this shaft extension project. (11 refs., 11 figs.)

  13. Dynamic response of underground openings in discontinuous rock

    International Nuclear Information System (INIS)

    Asmis, H.W.

    1984-02-01

    This report examines the behaviour of underground openings in discontinuous rock in response to seismic waves associated with either earthquakes or rock bursts. A literature search revealed that well-constructed underground structures, such as would be expected for nuclear fuel waste disposal vaults, underground pumped-storage or nuclear plants, have an extremely high resistance to damage from seismic motion. To complement these qualitative results, it was necessary to examine the basic mechanisms of the entire progression of seismic motion, from wave generation and propagation, to wave interaction with the underground opening. From these investigations, it was found that unless a seismic event occurs very close to the installation, the stresses generated will be low with respect to the excavation stresses, because high stress waves are rapidly attenuated in travelling through rock. As well, an earthquake may generate extremely high accelerations, but is limited in the maximum amount of stress that it can create. The question, however, of the actual specific nature of underground seismic motions still remains essentially unanswered, although it is expected that there is a reduction in peak motions with depth due to the effect of the free surface of the earth

  14. Horonobe underground research program. Research report of 2002 FY investigation

    International Nuclear Information System (INIS)

    2003-06-01

    Main results of investigation about Horonobe deep underground research center in 2002 FY were reported. It consists of six chapters: introduction, main results, selection of research center area, underground science research, R and D of geological disposal, and the environmental survey and research center on the ground. The research center area at about 3 km north of Horonobe (B1) was selected in the four areas: A, B1, B2 and C on the basis of data, researches in the sky, aboveground and underground and other conditions. The model of geological environment was constructed by physical, geological, surface water supply researches. Development of geological environment monitoring techniques, investigation of long stabilization of geological environment and design of underground facilities are reported. The basic design of preparation of research center was investigated. (S.Y.)

  15. Design and operation problems related to water curtain system for underground water-sealed oil storage caverns

    Directory of Open Access Journals (Sweden)

    Zhongkui Li

    2016-10-01

    Full Text Available The underground water-sealed storage technique is critically important and generally accepted for the national energy strategy in China. Although several small underground water-sealed oil storage caverns have been built in China since the 1970s, there is still a lack of experience for large-volume underground storage in complicated geological conditions. The current design concept of water curtain system and the technical instruction for system operation have limitations in maintaining the stability of surrounding rock mass during the construction of the main storage caverns, as well as the long-term stability. Although several large-scale underground oil storage projects are under construction at present in China, the design concepts and construction methods, especially for the water curtain system, are mainly based on the ideal porosity medium flow theory and the experiences gained from the similar projects overseas. The storage projects currently constructed in China have the specific features such as huge scale, large depth, multiple-level arrangement, high seepage pressure, complicated geological conditions, and high in situ stresses, which are the challenging issues for the stability of the storage caverns. Based on years' experiences obtained from the first large-scale (millions of cubic meters underground water-sealed oil storage project in China, some design and operation problems related to water curtain system during project construction are discussed. The drawbacks and merits of the water curtain system are also presented. As an example, the conventional concept of “filling joints with water” is widely used in many cases, as a basic concept for the design of the water curtain system, but it is immature. In this paper, the advantages and disadvantages of the conventional concept are pointed out, with respect to the long-term stability as well as the safety of construction of storage caverns. Finally, new concepts and principles

  16. ARTIFICIAL INTELLIGENCE CAPABILITIES FOR INCREASING ORGANIZATIONAL-TECHNOLOGICAL RELIABILITY OF CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Ginzburg Alexander Vital`evich

    2018-02-01

    Full Text Available The technology of artificial intelligence is actively being mastered in the world but there is not much talk about the capabilities of artificial intelligence in construction industry and this issue requires additional elaboration. As a rule, the decision to invest in a particular construction project is made on the basis of an assessment of the organizational and technological reliability of the construction process. Artificial intelligence can be a convenient quality tool for identifying, analyzing and subsequent control of the “pure” risks of the construction project, which not only will significantly reduce the financial and time expenditures for the investor’s decision-making process but also improve the organizational-technological reliability of the construction process as a whole. Subject: the algorithm of creation of artificial intelligence in the field of identification and analysis of potential risk events is presented, which will facilitate the creation of an independent analytical system for different stages of construction production: from the sketch to the working documentation and conduction of works directly on the construction site. Research objectives: the study of the possibility, methods and planning of the algorithm of works for creation of artificial intelligence technology in order to improve the organizational-technological reliability of the construction process. Materials and methods: the developments in the field of improving the organizational and technological reliability of construction were studied through the analysis and control of potential “pure” risks of the construction project, and the work was also carried out to integrate the technology of artificial intelligence into the area being studied. Results: An algorithm for creating artificial intelligence in the field of identification of potential “pure” risks of construction projects was presented. Conclusions: the obtained results are useful

  17. Radon measurements in underground and ground constructions in Tashkent city

    International Nuclear Information System (INIS)

    Akimov, V.A.; Yafasov, A.Y.; Vasidov, A.; En, Z.; Tillaev, T.; Tsipin, V.Z.

    2002-01-01

    magnitude 8.5 earthquake in 1966. Taken as a whole, not high concentration level of radon in the subway stations and related underground offices suggest that rocks and ores along which the railway and stations are located, and also construction materials used, are of low radioactivity. The radon concentration level in dwellings was evaluated by long term passive measurements using a cup detector sampler with a filtered end. After putting the detector, the open end was closed by a paper filter in order to prevent the detector from dust and other solid particulates and also from the radon progeny plate-out effect on the detector surface. Thus, the device detects only alphas from a radon gas and those daughters, which are produced inside the cup. The detector samplers were suspended on a ceiling on the distance of ∼200 cm from the floor. The detectors were exposed for 15-30 days. After exposition, the plastics were chemically etched in the 6N NaOH solution at 70 degrees centigrade, for 6 hours. We have measured concentration of radon in air of apartments and offices of reinforced concrete multi story buildings, two- and three-story buildings built with combined slag and burnt bricks and also in detached one-story houses built with unburnt bricks and clay. In multi story buildings the radon level was in the range of 16-97 Bq/m 3 , and average radon accumulation was practically independent of floor level, except for first floor, were radon level was higher due to its permeation from basement. In multi story buildings, radon comes mostly from construction materials. Emanation of radon from the ground depends on many factors, among them presence of uranium and radium in rock and ore constituents, soil porosity, availability of cracks and cavities in subsoil, tectonic activity of the region and others. To study season effect on radon level in air of dwellings and offices, the radon measurements were made in winter and summer periods in the same apartments and detached houses

  18. 30 CFR 784.25 - Return of coal processing waste to abandoned underground workings.

    Science.gov (United States)

    2010-07-01

    ... water underground, treatment of water if released to surface streams, and the effect on the hydrologic... the regulatory authority and the Mine Safety and Health Administration under 30 CFR 817.81(f). (b... of the mine void to be filled, method of constructing underground retaining walls, influence of the...

  19. Cigeo. The French deep geological repository for radioactive waste. Excavation techniques and technologies tested in underground laboratory and forecasted for the future construction of the project; Cigeo. Das franzoesische Tiefenlager fuer radioaktive Abfaelle. Im Untertagelabor getestete und fuer den kuenftigen Bau des Projekts vorgesehene Vortriebstechniken und -technologien

    Energy Technology Data Exchange (ETDEWEB)

    Chauvet, Francois [Agence Nationale pour la Gestion des Dechets Radioactifs (ANDRA), Chatenay-Malabry (France). Infrastructure Engineering Dept.; Bosgiraud, Jean-Michel [Agence Nationale pour la Gestion des Dechets Radioactifs (ANDRA), Chatenay-Malabry (France). Technological Development Program

    2015-07-01

    Cigeo is the French project for the repository of the high activity and intermediate long-lived radioactive waste. It will be situated at a depth of 500 m, In a clayish rock formation. An underground laboratory was built in the year 2000 and numerous tests are performed since 15 years, in order to know in detail the behavior of the rock and its ability to confine radioactive elements. In addition, this underground laboratory has brought and will continue to bring many lessons on the excavation methods to be chosen for the construction of Cigeo.

  20. A review of technology for verification of waste removal from Hanford Underground Storage Tanks (WHC Issue 30)

    International Nuclear Information System (INIS)

    Thunborg, S.

    1994-09-01

    Remediation of waste from Underground Storage Tanks (UST) at the Hanford Waste storage sites will require removal of all waste to a nearly clean condition. Current requirements are 99% clean. In order to meet remediation legal requirements, a means to remotely verify that the waste has been removed to sufficient level is needed. This report discusses the requirements for verification and reviews major technologies available for inclusion in a verification system. The report presents two operational scenarios for verification of residual waste volume. Thickness verification technologies reviewed are Ultrasonic Sensors, Capacitance Type Sensors, Inductive Sensors, Ground Penetrating Radar, and Magnetometers. Of these technologies Inductive (Metal Detectors) and Ground Penetrating Radar appear to be the most suitable for use as waste thickness sensors

  1. Cost and code study of underground building: a report to the Minnesota Energy Agency

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, R L

    1979-11-01

    The rapidly intensifying interest in the possible energy savings and environmental and land-use benefits associated with underground buildings has led increasing numbers of people to question restrictions that existing building codes place on underground construction and to make cost comparisons between underground structures and more-conventional buildings. Information in this report on earth-sheltered houses covers public policy issues (building code restrictions, taxation, insurance) and residential construction costs (cost breakdowns, general factors affecting costs, and life-cycle costs). The report also deals with regulatory and insurance issues (building codes, fire protection, insurance provisions) and construction costs for large underground buildings. The report recommends that: (1) the Minnesota Energy Agency consult with the Building Code Division of the Department of Administration on HUD Minimum Property Standards to examine the possibility of modifying several building-code requirements that affect earth-sheltered housing design; (2) HUD Minimum Property Standards be brought into line with the major building codes on the question of optional mechanical ventilation in houses; (3) model ordinances concerning setbacks, basement house provisions, and minimum square footage provisions to be drafted; (4) legal questions concerning the separation of ownership of the surface from that subsurface space be resolved; (5) questions concerning taxation of mined space be resolved; and (6) a life-cost inventory of underground residences and buildings in Minnesota be compiled.

  2. Enhanced Geothermal Systems (EGS) Well Construction Technology Evaluation Report

    Energy Technology Data Exchange (ETDEWEB)

    Polsky, Yarom [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Capuano, Louis [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Finger, John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Huh, Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Knudsen, Steve [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Chip, A.J. Mansure [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Raymond, David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Swanson, Robert [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2008-12-01

    This report provides an assessment of well construction technology for EGS with two primary objectives: 1. Determining the ability of existing technologies to develop EGS wells. 2. Identifying critical well construction research lines and development technologies that are likely to enhance prospects for EGS viability and improve overall economics.

  3. Study and application of construction technology of shielding concrete

    International Nuclear Information System (INIS)

    Wu Chongming; Ding Dexin; Chen Liangzhu; Zhao Jingfa; Li Shilong

    2008-01-01

    Process and techniques such as mixing,transportation and pouring have been studied. The construction technology for the shielding concrete with different densities has been summarized. The technology for the common concrete is quite different from that of shielding concrete, especially when its density is more than 4000 kg/m3. Application and practices have shown that different construction technologies shall be used for shielding concretes with different densities, and thus to ensure its uniformity and construction quality. (authors)

  4. Low alkaline cement used in the construction of a gallery in the Horonobe Underground Research Laboratory

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Sato, Haruo; Sugita, Yutaka; Ito, Seiji; Minamide, Masashi; Kitagawa, Yoshito

    2011-01-01

    In Japan, any high level radioactive waste (HLW) pos is to be constructed at over 300 m depth below surface. Tunnel support is used for safety during the construction and operation, and shotcrete and concrete lining are used as the tunnel support. Concrete is a composite material comprised of aggregate, cement and various admixtures. Low alkaline cement has been developed for the long term stability of the barrier systems whose performance could be negatively affected by highly alkaline conditions arising due to cement used in a repository. Japan Atomic Energy Agency (JAEA) has developed a low alkaline cement, named as HFSC (Highly Flyash Contained Silicafume Cement), containing over 60wt% of silica-fume (SF) and fly-ash (FA). HFSC was used experimentally as the shotcrete material in construction of part of the 140m deep gallery in the Horonobe Underground Research Laboratory (URL). The objective of this experiment was to assess the performance of HFSC shotcrete in terms of mechanics, workability, durability, and so on. HFSC used in this experiment is composed of 40wt% OPC (Ordinary Portland Cement), 20wt% SF, and 40 wt% FA. This composition was determined based on mechanical testing of various mixes of the above components. Because of the low OPC content, the strength of HFSC tends to be lower than that of OPC. The total length of tunnel using HFSC shotcrete is about 73 m and about 500 m 3 of HESC was used. The workability of HESC shotcrete was confirmed in this experimental construction. (author)

  5. Constructive philosophy of technology and responsible innovation

    NARCIS (Netherlands)

    Brey, Philip A.E.; Franssen, M.; Vermaas, P.E.; Kroes, P.; Meijers, A.W.M.

    2016-01-01

    This essay argues for a new turn after the empirical turn in the philosophy of technology: the societal turn, which is the turn from reflective philosophy of technology (academic philosophy concerned with analysis and understanding) to constructive philosophy of technology (philosophy that is

  6. Political construction of technology

    International Nuclear Information System (INIS)

    Bruheze, A.A.A. de la.

    1992-01-01

    In the 1970s radioactive waste disposal became a controversial scientific and social issue in the United States, after the US Atomic Energy Commission (AEC) charged with the development, regulation and promotion of nuclear technology, had tried to implement its disposal technology near Lyons, Kansas. This study traces the emergence of this controversy as part of the long-term development of the US radioactive waste disposal technology. Radioactive waste was not always considered a problem, and different meanings were attached to radwaste in the 1940s and early 1950s. Problem definitions and technical designs that underlaid this technology can be reconstructed, and its possible to show how some definitions received attention and others not, and how some became, and remained, dominant. During the process of problem definition, views compete, agendas are built, resources are allocated, and boundaries are created and maintained between 'inside' and 'outside world'. This is a political process, and by heuristically using concepts from political science and recent technology studies, the Political Construction of US radioactive waste disposal technologically can be reconstructed. (author). 301 refs.; 3 figs.; 15 tabs

  7. Automatic Construction by Contour Crafting Technology

    Directory of Open Access Journals (Sweden)

    Mohammad Reza Khorramshahi

    2017-07-01

    Full Text Available Contour Crafting is a novel technology in construction industry based on 3D printing that uses robotics to construct free form building structures by repeatedly laying down layers of material such as concrete. It is actually an approach to scale up automatic fabrication from building small industrial parts to constructing buildings. However, there are little information about contour crafting (CC in current use; present paper aims to describe the operational steps of creating a whole building by the machine reviewing relevant literature. Furthermore, it will represent the advantages of CC usage compared to traditional construction methods, as well as its applicability in construction industry.

  8. Technological features of installation of transformable low-rise buildings from sandwich panels

    Directory of Open Access Journals (Sweden)

    Pleshivtsev Aleksandr Aleksandrovich

    2018-04-01

    Full Text Available Subject of research: organizational and technological solutions are considered in the construction of transformable low-rise residential buildings using sandwich panels. Aims: rational choice of organizational and technological solutions for the rhythmic construction of the underground and above-ground part of the transformable low-rise buildings in order to reduce labor costs and construction time. Materials and methods: methods of computer modeling of the technological processes are used to determine the duration of the construction of the low-rise buildings. Results: rational methods for erecting a complex of transformable low-rise buildings are defined, parameters of technological processes are established, an analysis of technological operations is provided for the construction of transformable low-rise residential buildings using sandwich panels. Conclusions: now organizational and technological solutions for the construction of transformable low-rise residential buildings with the use of sandwich panels reduce labour costs, increase the construction pace and as well as the using of improved technological processes in the construction of such buildings leads to a reduction in construction time.

  9. Tunnel Boring Machine Cutter Maintenance for Constructing Underground Cable Lines from Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Jae Wang; Yee, Eric

    2014-01-01

    The tunnel boring machine (TBM) can construct an underground tunnel efficiently and without construction noise vibration related problems. Many civil projects, such as NPP construction, set importance on the economics of construction. Thus, advance rate, which is the speed at which the TBM is able to progress along its intended route, is one of the key factors affecting construction period and construction expenses. As the saying goes, time is money. Right Double Quotation Mark In addition, it is important to manage construction permits and civil complaints, even when construction expenses and construction periods are excluded. So, accurate prediction for advance rate is important when designing tunnel project. Several designers and project owners have tried to improve construction efficiency and tunneling advance rate.. There have been several studies on managing the rate of wear, designing an optimum tunnel face, and finding the optimum cutter spacing. Cutter replacements due to cutter wear and tear are very important because the wear and tear of cutters attached to the cutter head profoundly affect the advance rate. To manage cutter wear and tear is to control parameters related to cutter shape and cutter wear rate. There have been studies on the relationship between rock properties or TBM characteristics, and cutter wear or replacement. However, many of these studies relied on computer simulations or other small scale experiments. Therefore, this paper attempts to present a correlation between cutter replacement or cutter wear, against various parameters using practical data such as rock quality and TBM shield specifications, from an actual construction site. This study was conducted to suggest directions in the improvement of TBM cutters by analyzing relationships between rock conditions and cutter maintenance as well as TBM advance rates. Actual field data was collected and compared to actual design values in evaluating the effectiveness of traditional

  10. Tunnel Boring Machine Cutter Maintenance for Constructing Underground Cable Lines from Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jae Wang; Yee, Eric [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    The tunnel boring machine (TBM) can construct an underground tunnel efficiently and without construction noise vibration related problems. Many civil projects, such as NPP construction, set importance on the economics of construction. Thus, advance rate, which is the speed at which the TBM is able to progress along its intended route, is one of the key factors affecting construction period and construction expenses. As the saying goes, time is money. Right Double Quotation Mark In addition, it is important to manage construction permits and civil complaints, even when construction expenses and construction periods are excluded. So, accurate prediction for advance rate is important when designing tunnel project. Several designers and project owners have tried to improve construction efficiency and tunneling advance rate.. There have been several studies on managing the rate of wear, designing an optimum tunnel face, and finding the optimum cutter spacing. Cutter replacements due to cutter wear and tear are very important because the wear and tear of cutters attached to the cutter head profoundly affect the advance rate. To manage cutter wear and tear is to control parameters related to cutter shape and cutter wear rate. There have been studies on the relationship between rock properties or TBM characteristics, and cutter wear or replacement. However, many of these studies relied on computer simulations or other small scale experiments. Therefore, this paper attempts to present a correlation between cutter replacement or cutter wear, against various parameters using practical data such as rock quality and TBM shield specifications, from an actual construction site. This study was conducted to suggest directions in the improvement of TBM cutters by analyzing relationships between rock conditions and cutter maintenance as well as TBM advance rates. Actual field data was collected and compared to actual design values in evaluating the effectiveness of traditional

  11. Applying Sensor-Based Technology to Improve Construction Safety Management.

    Science.gov (United States)

    Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng

    2017-08-11

    Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions.

  12. Experience and prospects of using the pneumatic designs in underground mining

    Energy Technology Data Exchange (ETDEWEB)

    Rakhutin, V.S. [National Mining University of Ukraine, Dnipropetrovsk (Ukraine)

    1999-07-01

    The article reviews the experience of application of pneumatic designs ('flexible shells') in coal mines (pneumatic cogs and supports), ore mines (pneumatic cofferdams and partitions in filling), and in the construction of mines and underground constructions (pneumatic casings, temporary (pilot) supports). 2 refs.

  13. A research on the excavation and maintenance of underground energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Hee-Soon; Chung, So-Keul; Ryu, Chang-Ha [Korea Institute of Geology Mining and Materials, Taejon (KR)] (and others)

    1999-12-01

    CAES which is called as a compressed air energy storage was firstly developed at Huntorf, Gen-nan in 1978. The capacity of that system was 290MW, and it can be treated as a first commercial power plant. CAES has a lot of merits, such as saving the unit price of power generation, averaging the peak demand, improvement of maintenance, enlarging the benefit of dynamic use. According to the literature survey, the unlined rock cavern should be proposed to be a reasonable storing style as a method of compressed air storage in Korea. In this study, the most important techniques were evaluated through the investigation of the foreign construction case studies, especially on the unlined rock caverns in hard rock mass. We decided the hill of the Korea Institute of Geology, Mining and Materials as CAES site. If we construct the underground spaces in this site, the demand for electricity nearby Taejon should be considered. So we could determine the capacity of the power plant as a 350MW. This capacity needs a underground space of 200,000, and we can conclude 4 parallel tunnels 550m deep from the surface through the numerical studies. Design parameters were achieved from 300m depth boring job and image processing job. Moreover the techniques for determination of joint characteristics from the images could be obtained. Blasting pattern was designed on the underground spaces, and automatic gas control system and thermomechanical characteristics on caverns were also studied. And finally the following research items could be proposed for future researches. (1) Establishment of criteria for selection of optimal tunnel type. (2) Evaluation of water tightening ability. (3) Investigation of Lining type. (4) Development of techniques for site investigation in deep underground project. (5) Evaluation of construction techniques for underground space and shaft. (6) Investigation of long-term maintenance for pressured tunnel. (author). 14 refs.

  14. FLEXOWELL vertical lift systems in underground mining and construction industries

    Energy Technology Data Exchange (ETDEWEB)

    Paelke, J.W.

    1988-06-01

    Mining and quarrying companies are seeking improved and more continuous transport methods to reduce their costs. Frequently in the past the use of conveyors has been ruled out in steep mining applications but now the Scholtz FLEXOWELL belting which can be used at angles up to the vertical will enable many mines to consider complete belt conveyor systems for the first time. Applications will include steep conveyors for surface mines and quarries in order to eliminate the need for expensive and noisy fleets of trucks and the associated requirements to maintain haul roads. A further field is in the use of steep or vertical conveyors in underground mines to ensure improved continuity of output in existing shaft systems or reduced development costs in new mines. The Scholtz company, a member of the Nokia Group which had sales of about 3.5 billion U.S. Dollars in 1987, has more than 20 years experience with their FLEXOWELL belts. Over 40,000 units are operating around the world. These are already fully proven for vertical lifts of over 100 m (328ft) and up to 500 m (1,640 ft) is possible. Tonnage ratings of up to 4,000 t/h are achievable. Widespread acceptance of this technology has resulted in unique and major installations over the past few years. This paper reviews various applications - from the viewpoint of successfully proven vertical lift systems as well as the maintenance and downtime aspects. 3 refs., 9 figs.

  15. The in-situ experiment for performance confirmation of engineered barrier system at Horonobe Underground Research Laboratory. Examination of backfill material using muck from URL construction

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Ohno, Hirokazu; Tanai, Kenji; Fujita, Tomoo; Sugita, Yutaka

    2016-06-01

    The Horonobe Underground Research Laboratory (URL) Project has being pursued by Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formation at Horonobe, northern Hokkaido. The URL Project consists of two major research areas, “Geoscientific Research” and “Research and Development on Geological Disposal Technologies”, and proceeds in three overlapping phases, “Phase I: Surface-based investigations”, “Phase II: Investigations during tunnel excavation” and “Phase III: Investigations in the underground facilities”, over a period of around 20 years. Phase III investigation was started in 2010 fiscal year. The in-situ experiment for performance confirmation of engineered barrier system (EBS experiment) was prepared from 2013 to 2014 fiscal year at G.L.-350m gallery (Niche No.4), and heating by electric heater in simulated overpack started in January, 2015. One of objectives of the experiment is acquiring data concerned with Thermal – Hydrological – Mechanical – Chemical (THMC) coupled behavior. These data will be used in order to confirm the performance of engineered barrier system. In EBS experiment, the backfill material using mixture of bentonite and muck from Horonobe URL construction was used for backfilling a part of Niche No.4. This report shows the results of properties of the backfill material, confirmation test of compaction method and making backfill material block, and so on. From these results, it was confirmed that the backfill material would satisfy target value of the permeability and the swelling pressure. (author)

  16. Textile materials for lightweight constructions technologies, methods, materials, properties

    CERN Document Server

    2016-01-01

    In this book, experts on textile technologies convey both general and specific informa­tion on various aspects of textile engineering, ready-made technologies, and textile chemistry. They describe the entire process chain from fiber materials to various yarn constructions, 2D and 3D textile constructions, preforms, and interface layer design. In addition, the authors introduce testing methods, shaping and simulation techniques for the characterization of and structural mechanics calculations on anisotropic, pliable high-performance textiles, including specific examples from the fields of fiber plastic composites, textile concrete, and textile membranes. Readers will also be familiarized with the potential offered by increasingly popular textile structures, for instance in the fields of composite technology, construction technology, security technology, and membrane technology. Textile materials and semi-finished products have widely varied potential characteristics, and are commonly used as essential element...

  17. Discovery Mondays: 'The civil engineering genius of the 100-metre deep underground caverns'

    CERN Multimedia

    2004-01-01

    CERN is first and foremost a place where physicists study particle collisions. But to be able to observe the infinitely small, they need huge pieces of equipment, the accelerators and detectors, whose construction, some 100 metres below the earth's surface calls on the services of other fascinating disciplines. Take civil engineering, for example. For the construction of the LHC some 420 000 cubic metres of rock have had to be excavated for the 6500 metres of tunnel, 6 new shafts and 32 underground chambers and caverns. To avoid disrupting other experiments in progress, the work on these exceptional structures has had to be done without creating vibrations. The ATLAS experiment hall, a huge cathedral-like structure 100 metres below ground, is another mind-blowing feat of civil engineering. Its construction involved the use of ground-breaking technology, such as the system for suspending the ceiling put in place during the excavation work. At the next Discovery Monday, the specialists responsible for...

  18. Geological Feasibility of Underground Oil Storage in Jintan Salt Mine of China

    Directory of Open Access Journals (Sweden)

    Xilin Shi

    2017-01-01

    Full Text Available A number of large underground oil storage spaces will be constructed in deep salt mines in China in the coming years. According to the general geological survey, the first salt cavern oil storage base of China is planned to be built in Jintan salt mine. In this research, the geological feasibility of the salt mine for oil storage is identified in detail as follows. (1 The characteristics of regional structure, strata sediment, and impermeable layer distribution of Jintan salt mine were evaluated and analyzed. (2 The tightness of cap rock was evaluated in reviews of macroscopic geology and microscopic measuring. (3 According to the geological characteristics of Jintan salt mine, the specific targeted formation for building underground oil storage was chosen, and the sealing of nonsalt interlayers was evaluated. (4 Based on the sonar measuring results of the salt caverns, the characteristics of solution mining salt caverns were analyzed. In addition, the preferred way of underground oil storage construction was determined. (5 Finally, the results of closed well observation in solution mining salt caverns were assessed. The research results indicated that Jintan salt mine has the basic geological conditions for building large-scale underground oil storage.

  19. Master plan of Mizunami underground research laboratory

    International Nuclear Information System (INIS)

    1999-04-01

    In June 1994, the Atomic Energy Commission of Japan reformulated the Long-Term Programme for Research, Development and Utilisation of Nuclear Energy (LTP). The LTP (item 7, chapter 3) sets out the guidelines which apply to promoting scientific studies of the deep geological environment, with a view to providing a sound basis for research and development programmes for geological disposal projects. The Japan Nuclear Cycle Development Institute (JNC) has been conducting scientific studies of the deep geological environment as part of its Geoscientific Research Programme. The LTP also emphasised the importance of deep underground research facilities in the following terms: Deep underground research facilities play an important role in research relating to geological disposal. They allow the characteristics and features of the geological environment, which require to be considered in performance assessment of disposal systems, to be investigated in situ and the reliability of the models used for evaluating system performance to be developed and refined. They also provide opportunities for carrying out comprehensive research that will contribute to an improved overall understanding of Japan's deep geological environment. It is recommended that more than one facility should be constructed, considering the range of characteristics and features of Japan's geology and other relevant factors. It is important to plan underground research facilities on the basis of results obtained from research and development work already carried out, particularly the results of scientific studies of the deep geological environment. Such a plan for underground research facilities should be clearly separated from the development of an actual repository. JNC's Mizunami underground research laboratory (MIU) Project will be a deep underground research facility as foreseen by the above provisions of the LTP. (author)

  20. [The Research Advancement and Conception of the Deep-underground Medicine].

    Science.gov (United States)

    Xie, He-Ping; Liu, Ji-Feng; Gao, Ming-Zhong; Wan, Xue-Hong; Liu, Shi-Xi; Zou, Jian; Wu, Jiang; Ma, Teng-Fei; Liu, Yi-Lin; Bu, Hong; Li, Wei-Min

    2018-03-01

    The 21th century is the century of exploring and utilizing the underground space. In the future, more and more people will spend more and more time living or/and working in the underground space. However,we know little about the effect on the health of human caused by the underground environment. Herein,we systematically put forward the strategic conception of the deep-underground medicine,in order to reveal relative effects and mechanism of the potential factors in the deep underground space on human's physiological and psychological healthy,and to work out the corresponding countermeasures. The original deep-underground medicine includes the following items. ①To model different depth of underground environment according to various parameters (such as temperature,radiation,air pressure, rock,microorganism), and to explore their quantitative character and effects on human health and mechanism. ② To study the psychological change, maintenance of homeostasis and biothythm of organism in the deep underground space. ③ To learn the association between psychological healthy of human and the depth, structure, physical environment and working time of underground space. ④ To investigate the effect of different terrane and lithology on healthy of human and to deliberate their contribution on organism growth. ⑤ To research the character and their mechanism of growth,metabolism,exchange of energy,response of growth, aging and adaptation of cells living in deep underground space. ⑥ To explore the physiological feature,growth of microbiome and it's interaction with host in the deep underground space. ⑦ To develop deep-underground simulation space, the biologically medical technology and equipments. As a research basis,a deep-underground medical lab under a rock thickness of about 1 470 m has been built,which aims to operate the research of the effect on living organism caused by different depth of underground environment. Copyright© by Editorial Board of Journal

  1. Three-dimensional numerical analysis of stress and deformation of surrounding soil in safety construction of metro station

    International Nuclear Information System (INIS)

    Fung, I W H; Wang, J A; Au, A S K; Zhou, Y F

    2008-01-01

    Utilizing underground spaces synthetically has become an important task in urban planning and civil engineering in this century. Due to the complexity and uncertainty of technical issues in underground construction and soil engineering, construction safety arouses a great concern in underground construction industry. This paper focused on construction of an underground metro station, numerical analyses are carried out to estimate the possible stresses and deformations of surrounding soil and underground structures under the worse loading conditions to assess the structural design and construction safety. Influences of pit excavation on existing tunnel and surrounding spaces are discussed and the stability of main structure of metro station will be analyzed

  2. Construction of 'Monju' maintenance and waste disposal building by Shimizu Corporation

    International Nuclear Information System (INIS)

    Baba, Ikuo

    1994-01-01

    The scale of the building, the use, the outline of construction works and the construction processes of the maintenance and waste disposal building among the facilities of the fast breeder prototype reactor 'Monju' are described, and the construction technology which was adopted for ensuring the quality, the construction period and the safety, the state of carrying out quality assurance activity and so on are reported. Moreover, the building works and the electricity works are mentioned, and the examples that were devised on building side for smoothly advancing later electricity side works are introduced, further, as a feature work, the work of erecting the steel framework that constitutes the large space for repair area is explained. The arrangement of buildings, and the scale and the structure of the maintenance and waste disposal building which is a reinforced concrete building, partly steel framework reinforced concrete building, with four stories above ground and four stories underground and the total floor area of 14,354m 2 are described. Liquid waste treatment and washing facilities are in underground, and repair area, solid waste treatment and electric and air conditioning facilities are on above ground floors. (K.I.)

  3. Safety substantiation for underground isolation of spent nuclear fuel or spent nuclear materials as a basis to develop reliable technological solutions

    International Nuclear Information System (INIS)

    Gupalo, T.A.; Beygul, V.P.; Gupalo, M.S.; Kudinov, K.G.

    2000-01-01

    Major issues of the technique for mining and ecological safety substantiation of multi-barrier systems for long-term underground isolation of spent nuclear materials and solidified wastes containing long-lived radionuclides have been presented. The experience with the use of this technique for assessment of ecological safety for the long-term storage of plutonium-containing intermediate level wastes in underground facilities existing in the crystalline rock mass has been considered. The probabilistic evaluations of events of the emergency sequences of abnormal situations are based on the results of 40-year in-situ investigations in the rock mass. Feasibility of optimization has been shown for technological design solutions on storage facilities by the ''risk-costs'' principle. (authors)

  4. UNDERGROUND

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1993-11-15

    Full text: Cossetted deep underground, sheltered from cosmic ray noise, has always been a favourite haunt of neutrino physicists. Already in the 1930s, significant limits were obtained by taking a geiger counter down in Holborn 'tube' station, one of the deepest in London's underground system. Since then, neutrino physicists have popped up in many unlikely places - gold mines, salt mines, and road tunnels deep under mountain chains. Two such locations - the 1MB (Irvine/ Michigan/Brookhaven) detector 600 metres below ground in an Ohio salt mine, and the Kamiokande apparatus 1000m underground 300 km west of Tokyo - picked up neutrinos on 23 February 1987 from the famous 1987A supernova. Purpose-built underground laboratories have made life easier, notably the Italian Gran Sasso Laboratory near Rome, 1.4 kilometres below the surface, and the Russian Baksan Neutrino Observatory under Mount Andyrchi in the Caucasus range. Gran Sasso houses ICARUS (April, page 15), Gallex, Borexino, Macro and the LVD Large Volume Detector, while Baksan is the home of the SAGE gallium-based solar neutrino experiment. Elsewhere, important ongoing underground neutrino experiments include Soudan II in the US (April, page 16), the Canadian Sudbury Neutrino Observatory with its heavy water target (January 1990, page 23), and Superkamiokande in Japan (May 1991, page 8)

  5. Creation and Plan of an Underground Geologic Radioactive Waste Isolation Facility at the Nizhnekansky Rock Massif in Russia

    International Nuclear Information System (INIS)

    Gupalo, T A; Kudinov, K G; Jardine, L J; Williams, J

    2004-01-01

    This joint geologic repository project in Russia was initiated in May 2002 between the United States (U.S.) International Science and Technology Center (ISTC) and the Federal State Unitary Enterprise ''All-Russian Research and Design Institute of Production Engineering'' (VNIPIPT). The project (ISTC Partner Project 2377) is funded by the U.S. Department of Energy Office of Civilian Radioactive Waste Management (DOE-RW) for a period of 2-1/2 years. ISTC project activities were integrated into other ongoing geologic repository site characterization activities near the Mining and Chemical Combine (MCC K-26) site. This allowed the more rapid development of a plan for an underground research laboratory, including underground design and layouts. It will not be possible to make a final choice between the extensively studied Verkhne-Itatski site or the Yeniseiski site for construction of the underground laboratory during the project time frame because additional data are needed. Several new sources of data will become available in the next few years to help select a final site. Studies will be conducted at the 1-km deep borehole at the Yeniseisky site where drilling started in 2004. And in 2007, after the scheduled shutdown of the last operating reactor at the MCC K-26 site, data will be collected from the rock massif as the gneiss rock cools, and the cool-down responses modeled. After the underground laboratory is constructed, the data collected and analyzed, this will provide the definitive evidence regarding the safety of the proposed geologic isolation facilities for radioactive wastes (RW). This data will be especially valuable because they will be collected at the same site where the wastes will be subsequently placed, rather than on hypothetical input data only. Including the operating costs for 10 to 15 years after construction, the cost estimate for the laboratory is $50M. With additional funding from non-ISTC sources, it will be possible to complete this

  6. THE JOSEF REGIONAL UNDERGROUND RESEARCH CENTRE (JOSEF URC

    Directory of Open Access Journals (Sweden)

    Dana Pacovská

    2012-07-01

    Full Text Available The Josef Gallery, located in the central Bohemia region of the Czech Republic was first excavated in 1981 as an exploration complex for the potential mining of gold. In 2007, the gallery was substantially reconstructed to house the Josef Underground Educational Facility (Josef UEF, which subsequently became an autonomous workplace under the direction of the Czech Technical University in Prague. At the beginning of 2010, the UEF was renamed the Josef Regional Underground Research Centre (Josef URC which, along with the extensive underground complex, features modern above-ground facilities. One of the most important roles of this research center is to provide practical in-situ instruction in the fields of geotechnical engineering, geology, geochemistry, radiochemistry and radioecology. The training of future experts in this authentic underground setting involves the participation of several other Czech universities and numerous experienced specialists from outside the academic sphere. The IAEA (International Atomic Energy Agency has added the Josef URC to its prestigious list of international training canters involved in the “Training in and Demonstration of Waste Disposal Technologies in Underground Research Facilities – A Network of Centers of Excellence” project.

  7. Regulatory analysis of the Underground Storage Tank-Integrated Demonstration Program

    International Nuclear Information System (INIS)

    Smith, E.H.

    1992-01-01

    The Underground Storage Tank-Integrated Demonstration (UST-ID) Program has been developed to identify, demonstrate, test, and evaluate technologies that will provide alternatives to the current underground storage tank remediation program. The UST-ID Program is a national program that consists of five participating US Department of Energy (DOE) sites where technologies can be developed an ultimately demonstrated. Once these technologies are demonstrated, the UST-ID Program will transfer the developed technology system to industry (governmental or industrial) for application or back to Research and Development for further evaluation and modification, as necessary. In order to ensure that the UST-ID Program proceeds without interruption, it will be necessary to identify regulatory requirements along with associated permitting and notification requirements early in the technology development process. This document serves as a baseline for identifying certain federal and state regulatory requirements that may impact the UST-ID Program and the demonstration of any identified technologies

  8. Demonstration of in situ-constructed horizontal soil containment barrier at Fernald

    International Nuclear Information System (INIS)

    Pettit, P.J.; Ridenour, D.; Walker, J.; Saugier, K.

    1994-01-01

    A new design of jet grouting tool that can be guided by horizontal well casings and that operates in the horizontal plane has been used for the in situ placement of grout and construction of a prototype horizontal barrier that is free of windows. Jet grouting techniques have been advanced to permit construction of horizontal barriers underneath contaminated soil without having to excavate or disturb the waste. The paper describes progress on the Fernald Environmental Restoration Management Corporation (FERMCO) In Situ Land Containment Project which is sponsored by the US Department of Energy's (DOE) Office of Technology Development (OTD) for DOE's Fernald Environmental Management Project (FEMP). The Fernald project is to demonstrate a novel, enabling technology for the controlled underground placement of horizontal panels of grout, and the joining of adjacent panels to construct practical, extensive barriers. Construction strategy, equipment mechanics and operating details of this new method are described

  9. Monitoring underground water leakage pattern by ground penetrating radar (GPR) using 800 MHz antenna frequency

    Science.gov (United States)

    Amran, T. S. T.; Ismail, M. P.; Ahmad, M. R.; Amin, M. S. M.; Ismail, M. A.; Sani, S.; Masenwat, N. A.; Basri, N. S. M.

    2018-01-01

    Water is the most treasure natural resources, however, a huge amount of water are lost during its distribution that leads to water leakage problem. The leaks meant the waste of money and created more economic loss to treat and fix the damaged pipe. Researchers and engineers have put tremendous attempts and effort, to solve the water leakage problem especially in water leakage of buried pipeline. An advanced technology of ground penetrating radar (GPR) has been established as one of the non-destructive testing (NDT) method to detect the underground water pipe leaking. This paper focuses on the ability of GPR in water utility field especially on detection of water leaks in the underground pipeline distribution. A series of laboratory experiments were carried out using 800-MHz antenna, where the performance of GPR on detecting underground pipeline and locating water leakage was investigated and validated. A prototype to recreate water-leaking system was constructed using a 4-inch PVC pipe. Different diameter of holes, i.e. ¼ inch, ½ inch, and ¾ inch, were drilled into the pipe to simulate the water leaking. The PVC pipe was buried at the depth of 60 cm into the test bed that was filled with dry sand. 15 litres of water was injected into the PVC pipe. The water leakage patterns in term of radargram data were gathered. The effectiveness of the GPR in locating the underground water leakage was ascertained, after the results were collected and verified.

  10. Towards Implementation of Green Technology in Sabah Construction Industry

    Science.gov (United States)

    Azland Jainudin, Noor; Jugah, Ivy; Nasrizal Awang Ali, Awang; Tawie, Rudy

    2017-12-01

    The construction industry in Sabah is one of the major roles for development of social, economic infrastructures and buildings in generating wealth to the state besides the tourism sector. The increasing number of construction projects particularly in the rapid developing city of Kota Kinabalu, green technology as a whole is becoming more significant as it helps to develop effective solutions to encounter global environmental issues. The objective of the research is to identify the awareness and implementation of green technology in construction industry in Kota Kinabalu, Sabah. The methodology of the research is through distributing the questionnaire to the contractors, developers, consultants, architects and state government agencies to the area in Kota Kinabalu only. The questionnaires had been analysed to find out the mean value. 100 questionnaires distributed to the respondents but merely 85 questionnaires collected have been analysed. Based on the findings, 83.5% organisations were aware with the concept of green technology in construction project. In terms of the implementation only 64.7% had been implemented in their organizations. More than 50% from the major players such as contractors, consultants, developers, architects and state government agencies were aware based on six green technology concepts in their organizations. As a conclusion, the awareness towards green policy concept in construction industry is very satisfied. Meanwhile, in terms of implementation need to be increased the number of organizations to be involved in green technology in construction industry.

  11. Geological-Technical and Geo-engineering Aspects of Dimensional Stone Underground Quarrying

    Science.gov (United States)

    Fornaro, Mauro; Lovera, Enrico

    Underground exploitation of dimensional stones is not a novelty, being long since practised, as proved by a number of historical documents and by a certain number of ancient quarrying voids throughout the world. Anyway, so far, open cast quarrying has been the most adopted practice for the excavation of dimensional stones. One primary reason that led to this situation is of course connected to the lower production costs of an open cast exploitation compared to an underground one. This cheapness has been supported by geological and technical motives: on the one hand, the relative availability of surface deposits and, on the other, the development of technologies, which often can be used only outdoor. But, nowadays, general costs of quarrying activities should be re-evaluated because new, and often proper, restrictions have been strongly rising during recent years. As a consequence of both environmental and technical restrictions, pressure will more and more arise to reduce open cast quarrying and to promote underground exploitations. The trend is already well marked for weak rocks - for instance in the extractive basin of Carrara, where about one hundred quarries are active, 30 per cent is working underground, but also in Spain, Portugal and Greece the number of underground marble quarries is increasing - but not yet for hard rock quarrying, where only few quarries are working underground all around the world. One reason has to be found in cutting technologies traditionally used. In weak rocks, diamond wire saw and chain cutter are usable, with few adaptations, in underground spaces, while drilling and blasting, the traditional exploitation method for hard stone, is not easily usable in a confined space, where often only one free face is available. Many technicians and researchers agree that two technologies will probably open the door to underground quarrying in hard rocks: diamond wire and water jet. The first one is already available; the second should still be

  12. Confirmation of the applicability of low alkaline cement-based material in the Horonobe Underground Research Laboratory

    International Nuclear Information System (INIS)

    Nakayama, Masashi; Niunoya, Sumio; Minamide, Masashi

    2016-01-01

    In Japan, high-level radioactive waste repository will be constructed in a stable host rock formation more than 300 m underground. Tunnel support is used for safety during the construction and operation, so, shotcrete and concrete lining are used as the tunnel support. Concrete is a composite material comprised of aggregate, cement, water and various additives. Low alkaline cement has been developed for the long term stability of the barrier systems whose performance could be negatively affected by highly alkaline conditions arising due to cement used in a repository. Japan Atomic Energy Agency (JAEA) has developed the low alkaline cement, named as HFSC (Highly fly-ash contained silicafume cement), containing over 60wt% of silicafume (SF) and Fly-ash (FA). JAEA is presently constructing the underground research laboratory (URL) at Horonobe for research and development in the geosciences and repository engineering technology. HFSC was used experimentally as the shotcrete material in construction of part of the 350 m deep gallery in the Horonobe URL in 2013. The objective of this experiment was to assess the performance of HFSC shotcrete in terms of mechanics, workability, durability, and so on. HFSC used in this experiment is composed of 40wt% OPC (Ordinary Portland Cement), 20wt% SF, and 40wt% FA. This composition was determined based on mechanical testing of various mixes of the above components. Because of the low OPC content, the strength of HFSC tends to be lower than that of OPC in normal concrete. The total length of tunnel constructed using HFSC shotcrete is about 112 m at 350 m deep drift. The workability of HFSC shotcrete was confirmed by this experimental construction. In this report, we present detailed results of the in-situ construction test. (author)

  13. Main trends in scientific-research works during construction and operation of uranium mines and open cuts

    International Nuclear Information System (INIS)

    Mosinets, V.N.

    1993-01-01

    Consideration is given to main trends in research works during construction and operation of uranium mines and open cuts of Priargunsky mine-chemical association. Develops and introduced principally new design solutions and technologies in the field of open mining, underground mining, as well as in-situ and heap leaching, are described

  14. UNDERGROUND

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Full text: Cossetted deep underground, sheltered from cosmic ray noise, has always been a favourite haunt of neutrino physicists. Already in the 1930s, significant limits were obtained by taking a geiger counter down in Holborn 'tube' station, one of the deepest in London's underground system. Since then, neutrino physicists have popped up in many unlikely places - gold mines, salt mines, and road tunnels deep under mountain chains. Two such locations - the 1MB (Irvine/ Michigan/Brookhaven) detector 600 metres below ground in an Ohio salt mine, and the Kamiokande apparatus 1000m underground 300 km west of Tokyo - picked up neutrinos on 23 February 1987 from the famous 1987A supernova. Purpose-built underground laboratories have made life easier, notably the Italian Gran Sasso Laboratory near Rome, 1.4 kilometres below the surface, and the Russian Baksan Neutrino Observatory under Mount Andyrchi in the Caucasus range. Gran Sasso houses ICARUS (April, page 15), Gallex, Borexino, Macro and the LVD Large Volume Detector, while Baksan is the home of the SAGE gallium-based solar neutrino experiment. Elsewhere, important ongoing underground neutrino experiments include Soudan II in the US (April, page 16), the Canadian Sudbury Neutrino Observatory with its heavy water target (January 1990, page 23), and Superkamiokande in Japan (May 1991, page 8)

  15. Model based, sensor-directed remediation of underground storage tanks

    International Nuclear Information System (INIS)

    Harrigan, R.W.; Thunborg, S.

    1990-01-01

    Sensor-rich, intelligent robots that function with respect to models of their environment have significant potential to reduce the time and cost for the cleanup of hazardous waste while increasing operator safety. Sandia National Laboratories (SNL) is performing technology development and experimental investigations into the application of intelligent robot control technology to the problem of cleaning up waste stored in underground tanks. The tasks addressed in the SNL experiments are in situ physical characterizations of underground storage tanks (USTs) as well as the contained waste and the removal of the waste from the tank both for laboratory analysis and as part of the tank cleanup process. Both fully automatic and manual robot control technologies are being developed and demonstrated. The SNL-developed concept of human-assisted computer control will be employed whenever manual control of the robot is required. The UST Robot Technology Development Laboratory (URTDL) consists of a commercial gantry robot modified to allow hybrid force/position control

  16. Enhancing knowledge sharing management using BIM technology in construction.

    Science.gov (United States)

    Ho, Shih-Ping; Tserng, Hui-Ping; Jan, Shu-Hui

    2013-01-01

    Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology.

  17. Pilot research projects for underground disposal of radioactive wastes in the United States of America

    International Nuclear Information System (INIS)

    Stein, R.; Collyer, P.L.

    1984-01-01

    Disposal of commercial radioactive waste in the United States of America in a deep underground formation will ensure permanent isolation from the biosphere with minimal post-closure surveillance and maintenance. The siting, design and development, performance assessment, operation, licensing, certification and decommissioning of an underground repository have stimulated the development of several pilot research projects throughout the country. These pilot tests and projects, along with their resulting data base, are viewed as important steps in the overall location and construction of a repository. Beginning in the 1960s, research at pilot facilities has progressed from underground spent fuel tests in an abandoned salt mine to the production of vitrified nuclear waste in complex borosilicate glass logs. Simulated underground repository experiments have been performed in the dense basalts of Washington State, the volcanic tuffaceous rock of Nevada and both domal and bedded salts of Louisiana and Kansas. In addition to underground pilot in situ tests, other facilities have been constructed or modified to monitor the performance of spent fuel in dry storage wells and self-shielded concrete casks. As the National Waste Terminal Storage (NWTS) programme advances to the next stage of underground site characterization for each of three different geological sites, additional pilot facilities are under consideration. These include a Test and Evaluation Facility (TEF) for site verification and equipment performance and testing, as well as a salt testing facility for verification of in situ simulation equipment. Although not associated with the NWTS programme, the construction of the Waste Isolation Pilot Plant (WIPP) in the bedded salts of New Mexico is well under way for deep testing and experimentation with the defence programme's transuranic nuclear waste. (author)

  18. 77 FR 49741 - Cranes and Derricks in Construction: Demolition and Underground Construction

    Science.gov (United States)

    2012-08-17

    ..., subpart CC, to replace the earlier rule (Sec. 1926.550) for all construction work.\\1\\ In proposing the new... derricks used in construction work. For most construction work, the final rule replaced a prior cranes and... construction work. Through this proposed rule, OSHA is proposing to apply the updated requirements to that work...

  19. The Cigeo project: an industrial storage site for radioactive wastes in deep underground

    International Nuclear Information System (INIS)

    Krieguer, Jean-Marie

    2017-01-01

    In 2006, France has decided to store its high-level and long-lived radioactive wastes, mostly issued from the nuclear industry, in a deep geological underground disposal site. This document presents the Cigeo project, a deep underground disposal site (located in the East of France) for such radioactive wastes, which construction is to be started in 2021 (subject to authorization in 2018). After a brief historical review of the project, started 20 years ago, the document presents the radioactive waste disposal context, the ethical choice of underground storage (in France and elsewhere) for these types of radioactive wastes, the disposal site safety and financing aspects, the progressive development of the underground facilities and, of most importance, its reversibility. In a second part, the various works around the site are presented (transport, buildings, water and power supply, etc.) together with a description of the various radioactive wastes (high and intermediate level and long-lived wastes and their packaging) that will be disposed in the site. The different steps of the project are then reviewed (the initial design and initial construction phases, the pilot industrial phase (expected in 2030), the operating phase, and the ultimate phases that will consist in the definitive closure of the site and its monitoring), followed by an extensive description of the various installations of surface and underground facilities, their architecture and their equipment

  20. Underground aboveground. Technology and market of coal mining in Dutch Limburg during the eighteenth and nineteenth centuries

    International Nuclear Information System (INIS)

    Gales, B.P.A.

    2002-01-01

    This book considers the development of coal mining in the Dutch province of Limburg during the eighteenth and nineteenth centuries. It is focused on the technical development and its economic background. Within the Dutch borders, as defined at the Congress of Vienna and the Dutch-Prussian negotiations of 1815 and 1816, the mining industry was small. In fact, it only consisted of two mines. (Earlier, more companies of miners had been working in the area since the Middle Ages). The two mines, however, had a certain symbolic importance for contemporaries. Most telling was the stubborn refusal to cede coal-ground to Prussia, ending in a remarkable compromise. The new national frontier was different above and underground. Underground the old borders were maintained. Thus it came about that in matters of mining, the Dutch were locally sovereign under a foreign surface. This fact itself shows that the political divisions of the nineteenth and twentieth centuries were rather artificial constructions. Dutch coal-strata were a continuation of the seams of the Worm-basin or the Aachen coal field. The Dutch collieries were just the most north-western ones of a whole series, the Worm-mines, until new pits were constructed around the turn of the nineteenth and into the twentieth centuries and modem mining in the Dutch-Limburg field took off. This is also the more general perspective taken in this book. Developments on the Dutch side of the border are contrasted with those on the German side. Furthermore, the evolution of the mines between Aachen in Germany and the Dutch town Kerkrade are considered in the light of what happened in the neighbourhood of Liege (Belgium) and the mining districts further south in Belgium, the north of France and both the Ruhr and Saar districts in Germany. In short, the Austrasian field, the concept framed by Wrigley in 1962, is the locus of reference. The symbolic importance of Dutch coal mining stimulated a series of experiments in bringing the

  1. Wireless technologies for the Construction Sector

    DEFF Research Database (Denmark)

    Heller, Alfred; Orthmann, Christian

    2014-01-01

    the building sector and is therefore used to analyse requirements for alternative technologies. The motivation of the current work is to find upcoming technologies that bring improvements into the sector, for example improved life cycle costs and energy efficiencies, increasing quality, construction...... and operation efficiency and reducing faults and losses. The paper also lays out requirements expected by the sector. It will be shown that the wireless sensor network technology is a strong competitor that may meet the requirements. By analysing the application of such technologies throughout the building...... that follow the wireless sensor network, the paper will line up the requirements that the new technology has to meet to be introduced successfully....

  2. Design Of a Fixed-Dome Ferrocement Biodigester Built Partiall y Underground

    OpenAIRE

    Marianela de la Caridad Ortiz Alvarez; Hugo Rafael Wainshtok Rivas; Henry Hernández Sotomayor

    2016-01-01

    The analysis, structural design and constructive sequence of a fixed-dome biodigester built partially underground and using ferrocement as construction material under normal work conditions is in this paper developed. The biodigester capacity is 24 m3 and it is composed by a semispherical dome (cover), cylindricalwalls (body) and a circular slab(bottom). The biodigester using ferrocement as construction materialis in agreement with the service guaranty requirements settled for the established...

  3. Introduction of Building Information Modeling (BIM) Technologies in Construction

    Science.gov (United States)

    Milyutina, M. A.

    2018-05-01

    The issues of introduction of building information modeling (BIM) in construction industry are considered in this work. The advantages of this approach and perspectives of the transition to new design technologies, construction process management, and operation in the near future are stated. The importance of development of pilot projects that should identify the ways and means of verification of the regulatory and technical base, as well as economic indicators in the transition to Building Information Technologies in the construction, is noted.

  4. SuperCDMS Underground Detector Fabrication Facility

    Energy Technology Data Exchange (ETDEWEB)

    Platt, M.; Mahapatra, R.; Bunker, Raymond A.; Orrell, John L.

    2018-03-01

    The SuperCDMS SNOLAB dark matter experiment processes Ge and Si crystals into fully tested phonon and ionization detectors at surface fabrication and test facilities. If not mitigated, it is anticipated that trace-level production of radioisotopes in the crystals due to exposure to cosmic rays at (or above) sea level will result in the dominant source of background events in future dark matter searches using the current SuperCDMS detector technology. Fabrication and testing of detectors in underground facilities shielded from cosmic radiation is one way to directly reduce production of trace levels of radioisotopes, thereby improving experimental sensitivity for the discovery of dark matter beyond the level of the current experiment. In this report, we investigate the cost and feasibility to establish a complete detector fabrication processing chain in an underground location to mitigate cosmogenic activation of the Ge and Si detector substrates. For a specific and concrete evaluation, we explore options for such a facility located at SNOLAB, an underground laboratory in Sudbury, Canada hosting the current and future experimental phases of SuperCDMS.

  5. CASPAR - Nuclear Astrophysics Underground

    Science.gov (United States)

    Senarath, Chamaka; Caspar Collaboration

    2017-09-01

    The CASPAR mainly focuses on Stellar Nucleosynthesis, its impact on the production of heavy elements and study the strength of stellar neutron sources that propels the s-process, 13C(α,n)16O and 22Ne(α,n)25Mg. Currently, implementation of a 1MV fully refurbished Van de Graaff accelerator that can provide a high intensity Î+/- beam, is being done at the Sanford Underground Research Facility (SURF). The accelerator is built among a collaboration of South Dakota School of Mines and Technology, University of Notre Dame and Colorado School of Mines. It is understood that cosmic ray neutron background radiation hampers experimental Nucleosynthesis studies, hence the need to go underground in search for a neutron free environment, to study these reactions at low energies is evident. The first beam was produced in the middle of summer 2017. The entire accelerator will be run before the end of this year. A detailed overview of goals of CASPAR will be presented. NFS Grant-1615197.

  6. Recognition of underground nuclear explosion and natural earthquake based on neural network

    International Nuclear Information System (INIS)

    Yang Hong; Jia Weimin

    2000-01-01

    Many features are extracted to improve the identified rate and reliability of underground nuclear explosion and natural earthquake. But how to synthesize these characters is the key of pattern recognition. Based on the improved Delta algorithm, features of underground nuclear explosion and natural earthquake are inputted into BP neural network, and friendship functions are constructed to identify the output values. The identified rate is up to 92.0%, which shows that: the way is feasible

  7. Underground storage tanks

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Environmental contamination from leaking underground storage tanks poses a significant threat to human health and the environment. An estimated five to six million underground storage tanks containing hazardous substances or petroleum products are in use in the US. Originally placed underground as a fire prevention measure, these tanks have substantially reduced the damages from stored flammable liquids. However, an estimated 400,000 underground tanks are thought to be leaking now, and many more will begin to leak in the near future. Products released from these leaking tanks can threaten groundwater supplies, damage sewer lines and buried cables, poison crops, and lead to fires and explosions. As required by the Hazardous and Solid Waste Amendments (HSWA), the EPA has been developing a comprehensive regulatory program for underground storage tanks. The EPA proposed three sets of regulations pertaining to underground tanks. The first addressed technical requirements for petroleum and hazardous substance tanks, including new tank performance standards, release detection, release reporting and investigation, corrective action, and tank closure. The second proposed regulation addresses financial responsibility requirements for underground petroleum tanks. The third addressed standards for approval of state tank programs

  8. Underground pipeline corrosion

    CERN Document Server

    Orazem, Mark

    2014-01-01

    Underground pipelines transporting liquid petroleum products and natural gas are critical components of civil infrastructure, making corrosion prevention an essential part of asset-protection strategy. Underground Pipeline Corrosion provides a basic understanding of the problems associated with corrosion detection and mitigation, and of the state of the art in corrosion prevention. The topics covered in part one include: basic principles for corrosion in underground pipelines, AC-induced corrosion of underground pipelines, significance of corrosion in onshore oil and gas pipelines, n

  9. Radionuclide behavior at underground environment

    International Nuclear Information System (INIS)

    Hahn, Phil Soo; Park, Chung Kyun; Keum, Dong Kwon; Cho, Young Hwan; Kang, Moon Ja; Baik, Min Hoon; Hahn, Kyung Won; Park, Hyun Soo

    2003-04-01

    This study of radionuclide behavior at underground environment has been carried out as a part of the study of high-level waste disposal technology development. Therefore, the main objectives of this project are constructing a data-base and producing data for the safety assessment of a high-level radioactive waste, and verification of the objectivity of the assessment through characterization of the geochemical processes and experimental validation of the radionuclide migration. This project is composed of 6 subjects such as data production required for safety assessments, sorption properties and mechanisms, nuclide migration in the fractured rock, colloid formation and migration, nuclide speciation in deep geological environments, and total evaluation of geochemical behaviors considering multi-factors. The various results from the this project can be applicable to the preliminary safety and performance assessments of the established disposal concept for a future high-level radioactive waste repository. Providing required data and technical basis for assessment methodologies could be a direct application of the results. In a long-term view, the results can also be utilized as a technical background for the establishment of government policy for high-level radioactive waste disposal

  10. Polymers for subterranean containment barriers for underground storage tanks (USTs)

    International Nuclear Information System (INIS)

    Heiser, J.H.; Colombo, P.; Clinton, J.

    1992-12-01

    The US Department of Energy (DOE) set up the Underground Storage Tank Integrated Demonstration Program (USTID) to demonstrate technologies for the retrieval and treatment of tank waste, and closure of underground storage tanks (USTs). There are more than 250 underground storage tanks throughout the DOE complex. These tanks contain a wide variety of wastes including high level, low level, transuranic, mixed and hazardous wastes. Many of the tanks have performed beyond the designed lifetime resulting in leakage and contamination of the local geologic media and groundwater. To mitigate this problem it has been proposed that an interim subterranean containment barrier be placed around the tanks. This would minimize or prevent future contamination of soil and groundwater in the event that further tank leakages occur before or during remediation. Use of interim subterranean barriers can also provide sufficient time to evaluate and select appropriate remediation alternatives. The DOE Hanford site was chosen as the demonstration site for containment barrier technologies. A panel of experts for the USTID was convened in February, 1992, to identify technologies for placement of subterranean barriers. The selection was based on the ability of candidate grouts to withstand high radiation doses, high temperatures and aggressive tank waste leachates. The group identified and ranked nine grouting technologies that have potential to place vertical barriers and five for horizontal barriers around the tank. The panel also endorsed placement technologies that require minimal excavation of soil surrounding the tanks

  11. STABILITY CONTROL OF ELEVATING-TRANSFER VEHICLES IN THE CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Zhadanovskiy Boris Vasil’evich

    2016-05-01

    Full Text Available The underground space is widely used in the construction in big cities of the Russian Federation. These works need the use of elevating-transfer vehicles. In this case the requirements of norms and regulations on operating safety should be strictly observed, because their breach often leads to emergency situations and injuries. The organizational and technological solutions when developing the design documentation and executing construction and assembly works should be primarily based on the stability of lifting facilities. The author states the requirements to installation of lifting tackles (cranes. The features of their installation in different operation conditions on construction sites are described. The crane stability depends on many different indicators, which are considered by the author. The calculation algorithms of crane stability are offered.

  12. Controlled drill ampersand blast excavation at AECL's Underground Research Laboratory

    International Nuclear Information System (INIS)

    Kuzyk, G.W.; Onagi, D.P.; Thompson, P.M.

    1996-01-01

    A controlled drill and blast method has been developed and used to excavate the Underground Research Laboratory, a geotechnical facility constructed by Atomic Energy of Canada Limited (AECL) in crystalline rock. It has been demonstrated that the method can effectively reduce the excavation disturbed zone (EDZ) and is suitable for the construction of a used fuel disposal vault in the plutonic rock of the Canadian Shield

  13. Measurement techniques for in situ stresses around underground constructions in a deep clay formation

    Directory of Open Access Journals (Sweden)

    Li X.L.

    2010-06-01

    Full Text Available Disposal in deep underground geological formations is internationally recognized as the most viable option for the long-term management of high-level radioactive waste. In Belgium, the Boom clay formation is extensively studied in this context, in particular at the 225 m deep HADES Underground Research Facility in Mol. A cost-effective design of deep underground structures requires an accurate assessment of the in situ stresses; a good estimation of these stresses is also essential when interpreting in situ experiments regarding the hydro-mechanical behaviour of the host formation. Different measurement techniques are available to provide data on the stress evolution and other mechanical properties of the geological formation. The measurement can be direct (measurement of total pressure, or it can be an indirect technique, deriving the stress from related quantities such as strain (changes in structural members. Most total stress measurements are performed through permanently installed sensors; also once-only measurements are performed through specific methods (e.g. pressuremeter. Direct measurement of the stress state is challenging due to the complex mechanical behaviour of the clay, and the fact that the sensor installation inevitably disturbs the original stress field. This paper describes ways to deal with these problems and presents the results obtained using different techniques at HADES.

  14. Key technologies of drilling process with raise boring method

    Directory of Open Access Journals (Sweden)

    Zhiqiang Liu

    2015-08-01

    Full Text Available This study presents the concept of shaft constructed by raise boring in underground mines, and the idea of inverse construction can be extended to other fields of underground engineering. The conventional raise boring methods, such as the wood support method, the hanging cage method, the creeping cage method, and the deep-hole blasting method, are analyzed and compared. In addition, the raise boring machines are classified into different types and the characteristics of each type are described. The components of a raise boring machine including the drill rig, the drill string and the auxiliary system are also presented. Based on the analysis of the raise boring method, the rock mechanics problems during the raise boring process are put forward, including rock fragmentation, removal of cuttings, shaft wall stability, and borehole deviation control. Finally, the development trends of raise boring technology are described as follows: (i improvement of rock-breaking modes to raise drilling efficiency, (ii development of an intelligent control technique, and (iii development of technology and equipment for nonlinear raise boring.

  15. 3D Approach for Representing Uncertainties of Underground Utility Data

    NARCIS (Netherlands)

    olde Scholtenhuis, Léon Luc; Zlatanova, S.; den Duijn, Xander; Lin, Ken-Yu; El-Gohary, Nora; Tang, Pingbo

    Availability of 3D underground information models is key to designing and managing urban infrastructure construction projects. Buried utilities information is often registered by using different types of location data with different uncertainties. These data variances are, however, not considered in

  16. Innovation in Construction: Learning Processes in implementing new Technologies

    DEFF Research Database (Denmark)

    Clausen, Lennie

    1999-01-01

    The article is concerned with the question: How do construction firms implement new technology on construction projects? A model of the implementation process is presented based on a review of the construction innovation literature, innovation theory, and organisational learning theories....

  17. Habitats and Surface Construction Technology and Development Roadmap

    Science.gov (United States)

    Cohen, Marc; Kennedy, Kriss J.

    1997-01-01

    The vision of the technology and development teams at NASA Ames and Johnson Research Centers is to provide the capability for automated delivery and emplacement of habitats and surface facilities. The benefits of the program are as follows: Composites and Inflatables: 30-50% (goal) lighter than Al Hard Structures; Capability for Increased Habitable Volume, Launch Efficiency; Long Term Growth Potential; and Supports initiation of commercial and industrial expansion. Key Habitats and Surface Construction (H&SC) technology issues are: Habitat Shell Structural Materials; Seals and Mechanisms; Construction and Assembly: Automated Pro-Deploy Construction Systems; ISRU Soil/Construction Equipment: Lightweight and Lower Power Needs; Radiation Protection (Health and Human Performance Tech.); Life Support System (Regenerative Life Support System Tech.); Human Physiology of Long Duration Space Flight (Health and Human Performance Tech.); and Human Psychology of Long Duration Space Flight (Health and Human Performance Tech.) What is being done regarding these issues?: Use of composite materials for X-38 CRV, RLV, etc.; TransHAB inflatable habitat design/development; Japanese corporations working on ISRU-derived construction processes. What needs to be done for the 2004 Go Decision?: Characterize Mars Environmental Conditions: Civil Engineering, Material Durability, etc.; Determine Credibility of Inflatable Structures for Human Habitation; and Determine Seal Technology for Mechanisms and Hatches, Life Cycle, and Durability. An overview encompassing all of the issues above is presented.

  18. Underground storage of carbon dioxide

    Energy Technology Data Exchange (ETDEWEB)

    Tanaka, Shoichi [Univ. of Tokyo, Hongo, Bunkyo-ku (Japan)

    1993-12-31

    Desk studies on underground storage of CO{sub 2} were carried out from 1990 to 1991 fiscal years by two organizations under contract with New Energy and Indestrial Technology Development Organization (NEDO). One group put emphasis on application of CO{sub 2} EOR (enhanced oil recovery), and the other covered various aspects of underground storage system. CO{sub 2} EOR is a popular EOR method in U.S. and some oil countries. At present, CO{sub 2} is supplied from natural CO{sub 2} reservoirs. Possible use of CO{sub 2} derived from fixed sources of industries is a main target of the study in order to increase oil recovery and storage CO{sub 2} under ground. The feasibility study of the total system estimates capacity of storage of CO{sub 2} as around 60 Gton CO{sub 2}, if worldwide application are realized. There exist huge volumes of underground aquifers which are not utilized usually because of high salinity. The deep aquifers can contain large amount of CO{sub 2} in form of compressed state, liquefied state or solution to aquifer. A preliminary technical and economical survey on the system suggests favorable results of 320 Gton CO{sub 2} potential. Technical problems are discussed through these studies, and economical aspects are also evaluated.

  19. A selective study of Information technologies to improve operations efficiency in construction

    Directory of Open Access Journals (Sweden)

    Konikov Alexandr

    2018-01-01

    Full Text Available Today, information technologies (IT are used in almost every production industry. While the aspects of IT are well studied and discussed in relevant monographs, articles, web sources, etc., this paper reviews the performance improvement options in the construction industry by leveraging IT. From a wide range of information technologies the author has picked the most relevant solutions, from his point of view, based on several considerations, the most important one being the lack of adequate attention to these technologies specifically in the construction industry. The paper covers the following technologies: Big Data (a smart technology for high-speed processing of huge and diverse data arrays; situation centers (SC for construction and operations projects (SCs are successfully used in other industries for operating control of sophisticated facilities; data warehouses (DW for the construction industry (DWs are viewed as a standalone project rather than a supplement to Data Mining or Big Data; operational and dispatch radio communication service (radio communication can ensure instant connectivity between several subscribers; VSAT (a satellite technology for prompt connection of a distant construction site with the 'outer world' when no alternatives are available. The paper briefly presents the essence of each technology, describes the pre-requisites for its use in construction, outlines the key advantages, limits and shortcomings, and lists construction projects where it shall be worthwhile to use a specific technology projects.

  20. The Canfranc Underground Laboratory

    International Nuclear Information System (INIS)

    Amare, J.; Beltran, B.; Carmona, J.M.; Cebrian, S.; Garcia, E.; Irastorza, I.G.; Gomez, H.; Luzon, G.; Martinez, M.; Morales, J.; Ortiz de Solorzano, A.; Pobes, C.; Puimedon, J.; Rodriguez, A.; Ruz, J.; Sarsa, M.L.; Torres, L.; Villar, J.A.

    2005-01-01

    This paper describes the forthcoming enlargement of the Canfranc Underground Laboratory (LSC) which will allow to host new international Astroparticle Physics experiments and therefore to broaden the European underground research area. The new Canfranc Underground Laboratory will operate in coordination (through the ILIAS Project) with the Gran Sasso (Italy), Modane (France) and Boulby (UK) underground laboratories

  1. Inter-disciplinary Interactions in Underground Laboratories

    Science.gov (United States)

    Wang, J. S.; Bettini, A.

    2010-12-01

    Many of underground facilities, ranging from simple cavities to fully equipped laboratories, have been established worldwide (1) to evaluate the impacts of emplacing nuclear wastes in underground research laboratories (URLs) and (2) to measure rare physics events in deep underground laboratories (DULs). In this presentation, we compare similarities and differences between URLs and DULs in focus of site characterization, in quantification of quietness, and in improvement of signal to noise ratios. The nuclear waste URLs are located primarily in geological medium with potentials for slow flow/transport and long isolation. The URL medium include plastic salt, hard rock, soft clay, volcanic tuff, basalt and shale, at over ~500 m where waste repositories are envisioned to be excavated. The majority of URLs are dedicated facilities excavated after extensive site characterization. The focuses are on fracture distributions, heterogeneity, scaling, coupled processes, and other fundamental issues of earth sciences. For the physics DULs, the depth/overburden thickness is the main parameter that determines the damping of cosmic rays, and that, consequently, should be larger than, typically, 800m. Radioactivity from rocks, neutron flux, and radon gas, depending on local rock and ventilation conditions (largely independent of depth), are also characterized at different sites to quantify the background level for physics experiments. DULs have been constructed by excavating dedicated experimental halls and service cavities near to a road tunnel (horizontal access) or in a mine (vertical access). Cavities at shallower depths are suitable for experiments on neutrinos from artificial source, power reactors or accelerators. Rocks stability (depth dependent), safe access, and utility supply are among factors of main concerns for DULs. While the focuses and missions of URLs and DULs are very different, common experience and lessons learned may be useful for ongoing development of new

  2. Management of mining-related damages in abandoned underground coal mine areas using GIS

    International Nuclear Information System (INIS)

    Lee, U.J.; Kim, J.A.; Kim, S.S.; Kim, W.K.; Yoon, S.H.; Choi, J.K.

    2005-01-01

    The mining-related damages such as ground subsidence, acid mine drainage (AMD), and deforestation in the abandoned underground coal mine areas become an object of public concern. Therefore, the system to manage the mining-related damages is needed for the effective drive of rehabilitation activities. The management system for Abandoned Underground Coal Mine using GIS includes the database about mining record and information associated with the mining-related damages and application programs to support mine damage prevention business. Also, this system would support decision-making policy for rehabilitation and provide basic geological data for regional construction works in abandoned underground coal mine areas. (authors)

  3. Accelerating nano-technological innovation in the Danish construction industry

    DEFF Research Database (Denmark)

    Koch, Christian; Stissing Jensen, Jens

    2007-01-01

    . The institutional features of the system are furthermore poorly equipped at identifying potentials within high-tech areas. In order to exploit the potentials of nano-technology it is thus argued that an alternative TIS needs to be established. Initiatives should identify and support "incubation rooms" or marked......  By viewing the construction industry as a technological innovation system (TIS) this paper discusses possible initiatives to accelerate nanotechnological innovations. The point of departure is a recent report on the application of nano-technology in the Danish construction industry, which...... concludes that opportunities are generally poorly appreciated by the industry and research communities alike. It is found that the construction industry is characterised by low-tech trajectories where dedicated innovation networks are often too fragile for innovations to stabilize and diffuse...

  4. Research on Green Construction Technology Applied at Guangzhou Hongding Building Project

    Science.gov (United States)

    Lou, Yong Zhong

    2018-06-01

    The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.

  5. 40 CFR 125.99 - What are approved design and construction technologies?

    Science.gov (United States)

    2010-07-01

    ... construction technologies? 125.99 Section 125.99 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...) of the Act § 125.99 What are approved design and construction technologies? (a) The following....99 was suspended. ...

  6. Underground engineering applications

    International Nuclear Information System (INIS)

    Nordyke, M.D.

    1969-01-01

    Developments of any underground engineering application utilizing nuclear explosives involve answering the same questions one encounters in any new area of technology: What are the characteristics of the new tool? How is it applicable to the job to be done? Is it safe to use? and, most importantly, is its use economically acceptable? The many facets of the answers to these questions will be explored. The general types of application presently under consideration will also be reviewed, with particular emphasis on those specific projects actively being worked on by commercial interests and by the U.S. Atomic Energy Commission. (author)

  7. Underground engineering applications

    Energy Technology Data Exchange (ETDEWEB)

    Nordyke, M D [Lawrence Radiation Laboratory, Livermore, CA (United States)

    1969-07-01

    Developments of any underground engineering application utilizing nuclear explosives involve answering the same questions one encounters in any new area of technology: What are the characteristics of the new tool? How is it applicable to the job to be done? Is it safe to use? and, most importantly, is its use economically acceptable? The many facets of the answers to these questions will be explored. The general types of application presently under consideration will also be reviewed, with particular emphasis on those specific projects actively being worked on by commercial interests and by the U.S. Atomic Energy Commission. (author)

  8. Mizunami Underground Research Laboratory project. A project on research stage of investigating prediction from ground surface. Project report at fiscal year of 2000 to 2004

    International Nuclear Information System (INIS)

    2000-04-01

    This was a detailed plan after fiscal year 2000 on the first stage of the Research stage at investigating prediction from ground surface' in three researches carried out at the Mizunami Underground Research Laboratory (MIU) according to the 'Basic plan on research of underground science at MIU', based on progress of investigation and research before fiscal year 1999. This project contains following three items as its general targets; establishment of general investigating techniques for geological environment, collection of informations on deep underground environment, and development on foundation of engineering technology at super-deep underground. And, targets at investigating prediction stage from ground surface contain acquisition of geological environment data through investigations from ground surface to predict changes of the environment accompanied with underground geological environment and construction of experimental tunnel, to determine evaluating method on prediction results, and to determine plannings of an investigating stage accompanied with excavation of the tunnel by carrying out detail design of the tunnel. Here were introduced about results and problems on the investigation of the first phase, the integration of investigating results, and the investigation and researches on geology/geological structure, hydrology and geochemistry of groundwater, mechanical properties of rocks, and the mass transfer. (G.K.)

  9. The Large Underground Xenon (LUX) experiment

    International Nuclear Information System (INIS)

    Akerib, D.S.; Bai, X.; Bedikian, S.; Bernard, E.; Bernstein, A.; Bolozdynya, A.; Bradley, A.; Byram, D.; Cahn, S.B.; Camp, C.; Carmona-Benitez, M.C.; Carr, D.; Chapman, J.J.; Chiller, A.; Chiller, C.; Clark, K.; Classen, T.; Coffey, T.; Curioni, A.

    2013-01-01

    The Large Underground Xenon (LUX) collaboration has designed and constructed a dual-phase xenon detector, in order to conduct a search for Weakly Interacting Massive Particles (WIMPs), a leading dark matter candidate. The goal of the LUX detector is to clearly detect (or exclude) WIMPS with a spin independent cross-section per nucleon of 2×10 −46 cm 2 , equivalent to ∼1event/100kg/month in the inner 100-kg fiducial volume (FV) of the 370-kg detector. The overall background goals are set to have <1 background events characterized as possible WIMPs in the FV in 300 days of running. This paper describes the design and construction of the LUX detector

  10. The Past and the Future of Constructive Technology Assessment

    NARCIS (Netherlands)

    Schot, Johan; Rip, Arie

    1997-01-01

    Constructive technology assessment (CTA) is a member of the family of technology assessment approaches. developed in particular in the Netherlands and Denmark. CTA shifts the focus away from assessing impacts of new technologies to broadening design, development, and implementation processes.

  11. Underground storage of nuclear waste

    International Nuclear Information System (INIS)

    Russell, J.E.

    1977-06-01

    The objective of the National Waste Terminal Storage (NWTS) Program is to provide facilities in various deep geologic formations at multiple locations in the United States which will safely dispose of commerical radioactive waste. The NWTS Program is being administered for the Energy Research and Development Administration (ERDA) by the Office of Waste Isolation (OWI), Union Carbide Corporation, Nuclear Division. OWI manages projects that will lead to the location, construction, and operation of repositories, including all surface and underground engineering and facility design projects and technical support projects. 7 refs., 5 figs

  12. Underground storage of nuclear waste

    Energy Technology Data Exchange (ETDEWEB)

    Russell, J E

    1977-12-01

    The objective of the National Waste Terminal Storage (NWTS) Program is to provide facilities in various deep geologic formations at multiple locations in the United States which will safely dispose of commercial radioactive waste. The NWTS Program is being administered for the Energy Research and Development Administration (ERDA) by the Office of Waste Isolation (OWI), Union Carbide Corporation, Nuclear Division. OWI manages projects that will lead to the location, construction, and operation of repositories, including all surface and underground engineering and facility design projects and technical support projects.

  13. International mining forum 2004, new technologies in underground mining, safety in mines proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Jerzy Kicki; Eugeniusz Sobczyk (eds.)

    2004-01-15

    The book comprises technical papers that were presented at the International Mining Forum 2004. This event aims to bring together scientists and engineers in mining, rock mechanics, and computer engineering, with a view to explore and discuss international developments in the field. Topics discussed in this book are: trends in the mining industry; new solutions and tendencies in underground mines; rock engineering problems in underground mines; utilization and exploitation of methane; prevention measures for the control of rock bursts in Polish mines; and current problems in Ukrainian coal mines.

  14. Application of Electrical Resistivity Imaging and Land Surveying in the Analysis of Underground Construction Impact on the Warsaw Scarp

    Directory of Open Access Journals (Sweden)

    Kaczmarek Łukasz

    2016-12-01

    Full Text Available The paper presents the analysis of the II Underground Line construction’s impact on the Warsaw Scarp with the use of the electrical resistivity imaging (ERI, also known as the electrical resistivity tomography and further total station position measurements.The underground passes under the scarp perpendicular in the area of Dynasy Street 6, in Down-town district.The electrical resistivity imaging was performed for recognition of the geological structure and a potential land slide surface or zone.The gradient system was used during the prospection. In these analyses, the longitudinal section was 40 m long, and the depth of survey amounted to 6 m. In the case of the 200 m long transverse section, the resulted depth of survey was 30 m.The geophysical image of the longitudinal section,does not contain loosening soil zones,which could indicates lip surface.Next, total station measurements, which were tied to the archival geodetic observations’ results, were carried out. The aim of the measurements was to verify the activity of the horizontal and vertical displacements. The TBM excavation process led to summary vertical displacements up to approx. 24 mm and horizontal displacements amounting to approx. 13 mm. To sum up, the current land surveys reveals minor under ground line’ s construction impact on the scarp displacement. Nevertheless, the sensitive urban environment requires further monitoring, especially that the operation loads can result in displacement rate change.

  15. Underground design Laxemar, Layout D2

    Energy Technology Data Exchange (ETDEWEB)

    2009-11-15

    relative to the maximum horizontal stress. The estimated amount of support is on average very low because of the very good quality rock mass anticipated. This conclusion is also supported by the underground experience at the Aespoe Hard Rock Laboratory. The layout of the repository area has the deposition tunnels aligned < 30 deg relative to the maximum horizontal stress. With this orientation spalling is not anticipated in the deposition tunnels or deposition holes. The excavations for the Repository Access (shafts and ramps) will encounter the greatest frequency of open water-bearing fractures located between 0 and 150 m depth. These access excavations may result in a groundwater drawdown that will need to be minimised. The rock mass at the repository horizon is expected to encounter water-bearing fractures approximately 1 every 10 m, and in some areas even more frequently. Groundwater inflows are expected to be significant at repository level requiring extensive grouting. Results from grouting analyses indicate that conventional grouting measures may not be sufficient to meet the inflow criterion. In some areas of the repository, e.g. hydraulic domain HRD-EW007, sealing may not be practical with cement-based grouts and other sealing technologies, such as silica sol technology, may be required. The design and layout presented in this report is based on information compiled at the end of the complete site investigation phase and contained in the report SDM Site TR-09-01. As with all site investigations, at the scale of the repository, there are uncertainties associated with the interpretation of geological information based on borehole investigations. These uncertainties were identified and the impact of these on the current design was evaluated using risk assessment methodologies. The conclusion from the risk assessment is that the available gross capacity of about 8,000 deposition positions is unlikely to be sufficient to host a repository with 6,000 deposited canisters

  16. The technological construction of social power.

    NARCIS (Netherlands)

    Brey, Philip A.E.

    2007-01-01

    This essay presents a theory of the role of technology in the distribution and exercise of social power. The paper studies how technical artefacts and systems are used to construct, maintain or strengthen power relations between agents, whether individuals or groups, and how their introduction and

  17. WASTAGE OF UNDERGROUND WATER - STEPS TOWARDS A TRAP?

    Directory of Open Access Journals (Sweden)

    Shibabrata Pattanayak

    2015-06-01

    Full Text Available Underground water is used indiscriminately for the purposes like agriculture, serving purposes of urban people, cold drink and mineral water manufacturing etc. As a matter of policy, the rural areas are supplied with underground water in India without considering the factors like actual requirement of water in a particular area, season of scarcity of water etc. It is very common to see the ever open taps of water supplying lines in rural India thronging water continuously and nobody is there to use it. The discharge rate of underground water is far more than the charging rate. This may lead to a very serious condition of water scarcity in near future. Various steps like holding of rain water in the water bodies, selection of crop with requirement of lesser amount of water during the dry months as well as use of Forward Osmosis (FO technology for Cold drinks or Bottled Drinking Water manufacturing from the sea water are advocated.

  18. Novel, low-vibration excavation techniques for underground radioactive waste storage

    International Nuclear Information System (INIS)

    Kogelmann, W.J.

    1994-01-01

    In order to meet the construction specifications of the challenging Yucca Mountain nuclear waste repository, novel, low-vibration tunneling and shaft sinking techniques must be applied. Conventional roadheaders, even with reduced cutting speed, cannot be employed due to the high strength and widely varying physical properties of the rock formations. The Multi Tool Miner (MTM) concept utilizes both an impact hammer, for efficient hard rock mining, and a cutter head, tooled with drag-bits (picks), to profile tunnel walls down to the sound, undisturbed rock, in order to meet the 10,000-year stability requirement for underground structures. As the operational requirements and rock conditions at the Yucca Mountain site are not suitable for wide, transverse open-quotes ripperclose quotes cutting drums, a small diameter, in-line, open-quotes milling augerclose quotes cutter head was developed. The synergetic combination of high-production hammer excavation and precise milling will facilitate the construction of stable, long-life underground structures within the budget limitations mandated by Congress

  19. Challenges associated with the design of underground grinding plant at McArthur River project

    International Nuclear Information System (INIS)

    Jamrozek, J.S.

    2000-01-01

    McArthur River is an unique high grade uranium underground mine. Ore grinding and thickening are part of the underground operation. The grinding circuit is designed to operate in conditions different from conventional plant environments. Design of the grinding plant was a collective effort of a multi-disciplinary engineering team closely cooperating with project operating personnel. The equipment had to be selected to reflect widely varying ore properties. A user-friendly plant layout provides access to equipment inspections, services, and the delivery of necessary components. The size of the grinding chamber was limited in order to keep the rock stress levels within allowable values. All underground equipment brought to the construction site was restricted in size and weight. Plant construction faced limited storage space underground, tight erection sequencing, and schedule. Plant ventilation is a critical design feature. It efficiently removes radioactive dust from work areas, eliminates stagnant air pockets, and separates clean air from contaminated air areas. Radiation shielding on the equipment is designed to correspond with operational and maintenance functions. Plant operation is remotely controlled and requires little attendance. Video cameras are used on critical equipment and in controlled access areas. An extensive program of preventive and predictive maintenance allows highly reliable plant operation. (author)

  20. Optimization Design and Application of Underground Reinforced Concrete Bifurcation Pipe

    Directory of Open Access Journals (Sweden)

    Chao Su

    2015-01-01

    Full Text Available Underground reinforced concrete bifurcation pipe is an important part of conveyance structure. During construction, the workload of excavation and concrete pouring can be significantly decreased according to optimized pipe structure, and the engineering quality can be improved. This paper presents an optimization mathematical model of underground reinforced concrete bifurcation pipe structure according to real working status of several common pipe structures from real cases. Then, an optimization design system was developed based on Particle Swarm Optimization algorithm. Furthermore, take the bifurcation pipe of one hydropower station as an example: optimization analysis was conducted, and accuracy and stability of the optimization design system were verified successfully.

  1. Underground structures increasing the intrinsic vulnerability of urban groundwater: Sensitivity analysis and development of an empirical law based on a groundwater age modelling approach

    Science.gov (United States)

    Attard, Guillaume; Rossier, Yvan; Eisenlohr, Laurent

    2017-09-01

    In a previous paper published in Journal of Hydrology, it was shown that underground structures are responsible for a mixing process between shallow and deep groundwater that can favour the spreading of urban contamination. In this paper, the impact of underground structures on the intrinsic vulnerability of urban aquifers was investigated. A sensitivity analysis was performed using a 2D deterministic modelling approach based on the reservoir theory generalized to hydrodispersive systems to better understand this mixing phenomenon and the mixing affected zone (MAZ) caused by underground structures. It was shown that the maximal extent of the MAZ caused by an underground structure is reached approximately 20 years after construction. Consequently, underground structures represent a long-term threat for deep aquifer reservoirs. Regarding the construction process, draining operations have a major impact and favour large-scale mixing between shallow and deep groundwater. Consequently, dewatering should be reduced and enclosed as much as possible. The role played by underground structures' dimensions was assessed. The obstruction of the first aquifer layer caused by construction has the greatest influence on the MAZ. The cumulative impact of several underground structures was assessed. It was shown that the total MAZ area increases linearly with underground structures' density. The role played by materials' properties and hydraulic gradient were assessed. Hydraulic conductivity, anisotropy and porosity have the strongest influence on the development of MAZ. Finally, an empirical law was derived to estimate the MAZ caused by an underground structure in a bi-layered aquifer under unconfined conditions. This empirical law, based on the results of the sensitivity analysis developed in this paper, allows for the estimation of MAZ dimensions under known material properties and underground structure dimensions. This empirical law can help urban planners assess the area of

  2. Demonstration test of underground cavern-type disposal facilities, fiscal 2010 status - 59180

    International Nuclear Information System (INIS)

    Akiyama, Yoshihiro; Terada, Kenji; Oda, Nobuaki; Yada, Tsutomu; Nakajima, Takahiro

    2012-01-01

    A test to demonstrate practical construction technology for underground cavern-type disposal facilities is currently underway. Cavern-type disposal facilities are a radioactive waste repository excavated to a depth of 50 to 100 m below ground and constructed with an engineered barrier system (EBS) that is a combination of low-permeable bentonite material and low-diffusive cementitious material. The disposed materials are low-level radioactive waste with relatively high radioactivity, mainly generated from power reactor decommissioning, and certain transuranic wastes that are mainly generated from spent fuel reprocessing. The project started in fiscal 2005*, and since fiscal 2007 a full-scale mock-up of a disposal facility has been constructed in an actual sub-surface environment. The main objective of the demonstration test is to establish construction procedures and methods which ensure the required quality of an EBS on-site. Certain component parts of the facility had been constructed in an underground cavern by fiscal 2010, and tests so far have demonstrated both the practicability of the construction and the achievement of the required quality. This paper covers the project outline and the test results obtained by the construction of certain EBS components. The following results were obtained from the construction test of EBS in the test cavern: 1) The dry density of bentonite buffer at the lower layer constructed by vibratory compaction shows that 95% of core samples have densities within the target range. 2) The specified mix for the low-diffusion layer has uniform density and crack-control properties, and meets the requirements for diffusion performance. 3) The specified mix of the concrete pit has sufficient passing ability through congested reinforcement and meets the requirements of strength performance. 4) The dry density of the bentonite buffer at the lateral layer constructed by the spraying method shows that 65% of the core samples are within the

  3. Environment Of Underground Water And Pollution

    Energy Technology Data Exchange (ETDEWEB)

    Han, Jeong Sang

    1998-02-15

    This book deals with environment of underground water and pollution, which introduces the role of underground water in hydrology, definition of related study of under water, the history of hydro-geology, basic conception of underground water such as origin of water, and hydrogeologic characteristic of aquifers, movement of underground water, hydrography of underground water and aquifer test analysis, change of an underground water level, and water balance analysis and development of underground water.

  4. THE UNDERGROUND ECONOMY FROM THE PERSPECTIVE OF THE TRIAD ECONOMICS, SOCIOLOGY, PSYCHOLOGY

    Directory of Open Access Journals (Sweden)

    Corneliu\tSorin\tBAICU

    2015-06-01

    Full Text Available Underground economy, in view of researchers, economists and jurists, is a theoretical complex construct, a phenomenon with profound social and economic reverberations. This study argues multidisciplinary integrative the sociological, psychological and socio-psychological approach of underground economy. The premises of this study are given by methodological individualism and rational choice theory through building in neoclassical version of Homo economicus able to interact in a multidisciplinary and multifaceted manner with the area of social sciences. For the nonce, we submit to analysis an integrative model of Homo Oeconimicus with Homo Sociologicus, aggregated with elements of social psychology. Synergistic effects of this integrative approach consist of the ability to give an answer as relevant on symptoms and forms of deviant behavior and thus to explain the development of underground economy. The finality of this paper, starting from the stated premises, resides in the explanation and analysis of deviant behavior in the framework of the morphology and causality of underground economy. Deviant behavior in the context of our analysis reveals the coherence perspective on the following issues: anatomy and etiology of underground economy (informal and underground activities, illegal labor, tax fraud, etc.; attitude towards rules, society and the state (tax mentality, tax morality, moral conscience; tax compliance or non-compliance (willingness to pay tax liabilities. This paper is intended to constitute a pleading for an interdependent approach, multi-causal and interdisciplinary of underground economy

  5. Radioactivity source terms for underground engineering application

    Energy Technology Data Exchange (ETDEWEB)

    Tewes, H A [Lawrence Radiation Laboratory, Livermore, CA (United States)

    1969-07-01

    The constraints on nuclide production are usually very similar in any underground engineering application of nuclear explosives. However, in some applications the end product could be contaminated unless the proper nuclear device is used. This fact can be illustrated from two underground engineering experiments-Gasbuggy and Sloop. In the Gasbuggy experiment, appreciable tritium has been shown to be present in the gas currently being produced. However, in future gas stimulation applications (as distinct from experiments), a minimum production of tritium by the explosive is desirable since product contamination by this nuclide may place severe limitations on the use of the tritiated gas. In Sloop, where production of copper is the goal of the experiment, product contamination would not be caused by tritium but could result from other nuclides: Thus, gas stimulation could require the use of fission explosives while the lower cost per kiloton of thermonuclear explosives could make them attractive for ore-crushing applications. Because of this consideration, radionuclide production calculations must be made for both fission and for thermonuclear explosives in the underground environment. Such activation calculations materials of construction are performed in a manner similar to that described in another paper, but radionuclide production in the environment must be computed using both fission neutron and 14-MeV neutron sources in order to treat the 'source term' problem realistically. In making such computations, parameter studies including the effects of environmental temperature, neutron shielding, and rock types have been carried out. Results indicate the importance of carefully evaluating the radionuclide production for each individual underground engineering application. (author)

  6. Radioactivity source terms for underground engineering application

    International Nuclear Information System (INIS)

    Tewes, H.A.

    1969-01-01

    The constraints on nuclide production are usually very similar in any underground engineering application of nuclear explosives. However, in some applications the end product could be contaminated unless the proper nuclear device is used. This fact can be illustrated from two underground engineering experiments-Gasbuggy and Sloop. In the Gasbuggy experiment, appreciable tritium has been shown to be present in the gas currently being produced. However, in future gas stimulation applications (as distinct from experiments), a minimum production of tritium by the explosive is desirable since product contamination by this nuclide may place severe limitations on the use of the tritiated gas. In Sloop, where production of copper is the goal of the experiment, product contamination would not be caused by tritium but could result from other nuclides: Thus, gas stimulation could require the use of fission explosives while the lower cost per kiloton of thermonuclear explosives could make them attractive for ore-crushing applications. Because of this consideration, radionuclide production calculations must be made for both fission and for thermonuclear explosives in the underground environment. Such activation calculations materials of construction are performed in a manner similar to that described in another paper, but radionuclide production in the environment must be computed using both fission neutron and 14-MeV neutron sources in order to treat the 'source term' problem realistically. In making such computations, parameter studies including the effects of environmental temperature, neutron shielding, and rock types have been carried out. Results indicate the importance of carefully evaluating the radionuclide production for each individual underground engineering application. (author)

  7. The role of the underground for massive storage of energy: a preliminary glance of the French case

    Science.gov (United States)

    Audigane, Pascal; Gentier, Sylvie; Bader, Anne-Gaelle; Beccaletto, Laurent; Bellenfant, Gael

    2014-05-01

    The question of storing energy in France has become of primary importance since the launch of a road map from the government which places in pole position this topic among seven major milestones to be challenged in the context of the development of innovative technology in the country. The European objective to reach 20% of renewables in the energy market, from which a large part would come from wind and solar power generation, raises several issues regarding the capacity of the grid to manage the various intermittent energy sources in line with the variability of the public demand and offer. These uncertainties are highly influenced by unpredictable weather and economic fluctuations. To facilitate the large-scale integration of variable renewable electricity sources in grids, massive energy storage is needed. In that case, electric energy storage techniques involving the use of underground are often under consideration as they offer a large storage capacity volume with a adapted potential of confining and the space required for the implantation. Among the panel of massive storage technologies, one can find (i) the Underground Pumped Hydro-Storage (UPHS) which are an adaptation of classical Pumped Hydro Storage system often connected with dam constructions, (ii) the compressed air storage (CAES) and (iii) the hydrogen storage from conversion of electricity into H2 and O2 by electrolysis. UPHS concept is based on using the potential energy between two water reservoirs positioned at different heights. Favorable natural locations like mountainous areas or cliffs are spatially limited given the geography of the territory. This concept could be extended with the integration of one of these reservoirs in an underground cavities (specifically mined or reuse of preexisting mines) to increase opportunities on the national territory. Massive storage based on compression and relaxation of air (CAES) requires high volume and confining pressure around the storage that exists

  8. Stability assessment for underground excavations and key construction techniques

    CERN Document Server

    Zhu, Hanhua; Zhao, Yu; Niu, Fusheng

    2017-01-01

    This book examines how the state of underground structures can be determined with the assistance of force, deformation and energy. It then analyzes mechanized shield methods, the New Austrian tunneling method (NATM) and conventional methods from this new perspective. The book gathers a wealth of cases reflecting the experiences of practitioners and administrators alike. Based on statistical and engineering studies of these cases, as well as lab and field experiments, it develops a stability assessment approach incorporating a stable equilibrium, which enables engineers to keep the structure and surrounding rocks safe as long as the stable equilibrium and deformation compliance are maintained. The book illustrates the implementation of the method in various tunneling contexts, including soil-rock mixed strata, tunneling beneath operating roads, underwater tunnels, and tunnel pit excavation. It offers a valuable guide for researchers, designers and engineers, especially those who are seeking to understand the u...

  9. Approach to improve construction management utilizing information technology

    International Nuclear Information System (INIS)

    Lee, Woo Bang; Moon, Jin Yeong

    2003-01-01

    Korea Hydro and Nuclear Power (KHNP) has been managed Nuclear Power Plant (NPP) construction projects including basic project planning, design, procurement, construction and start-up for nearly 30 years, and taken the leading role in the self-reliance program for constructing NPP. To maintain its leading position of construction technology and export it to other countries, it is more likely required to build the strong and competitive business management system to improve internal business efficiency and transparency, and also to respond to the change of external business circumstances such as electricity market opening. KHNP is implementing Enterprise Resource Planning (ERP) System as a business innovation tool to improve business efficiency, which changes the way of performing work from organizational system to process-oriented system in order to optimize the company resources to achieve above goals. This change should be made based on the results of performing Business Process Re-engineering (BPR) to maximize overall business efficiency. For the construction project management area, the establishment of Integrated Construction Information Sharing System based on Information Technology (IT) is the most important part. It makes possible to build collaboration system with 'Win-Win strategy' between the project owner and all related entities and to contribute to secure transparency and cut the project cost down. We would like to introduce our NPP Construction Project Management System, Infrastructure for Information System, Information Sharing System among construction related entities and Implementation Practices in this paper and also include the suggestions on our customary practice and subject that should be improved

  10. The mechanism study between 3D Space-time deformation and injection or extraction of gas pressure change, the Hutubi Underground gas storage

    Science.gov (United States)

    Xiaoqiang, W.; Li, J.; Daiqing, L.; Li, C.

    2017-12-01

    The surface deformation of underground gas reservoir with the change of injection pressure is an excellent opportunity to study the load response under the action of tectonic movement and controlled load. This paper mainly focuses on the elastic deformation of underground structure caused by the change of the pressure state of reservoir rock under the condition of the irregular change of pressure in the underground gas storage of Hutubi, the largest underground gas storage in Xinjiang, at the same time, it makes a fine study on the fault activities of reservoir and induced earthquakes along with the equilibrium instability caused by the reservoir. Based on the 34 deformation integrated observation points and 3 GPS continuous observation stations constructed in the underground gas storage area of Hutubi, using modern measurement techniques such as GPS observation, precise leveling survey, flow gravity observation and so on, combined with remote sensing technology such as InSAR, the 3d space-time sequence images of the surface of reservoir area under pressure change were obtained. Combined with gas well pressure, physical parameters and regional seismic geology and geophysical data, the numerical simulation and analysis of internal changes of reservoir were carried out by using elastic and viscoelastic model, the deformation mechanical relationship of reservoir was determined and the storage layer under controlled load was basically determined. This research is financially supported by National Natural Science Foundation of China (Grant No.41474016, 41474051, 41474097)

  11. Arrangement for underground storage of materials of every kind

    International Nuclear Information System (INIS)

    Marek, O.; Seisenbacher, H.; Toth, L.

    1982-01-01

    Construction of a spheroidal tank, made of two sheets of concrete, used for underground storage. Space between inner and outer sheet is filled with a vibration absorbing material. The bottom of the outer sheet is made of material with lower rigidness, which allows the line of fault in cases of tectonic motions to slide off. (J.K.) [de

  12. A review of the available technologies for sealing a potential underground nuclear waste repository at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Fernandez, J.A.; Richardson, A.M.

    1994-11-01

    The purpose of this report is to assess the availability of technologies to seal underground openings. The technologies are needed to seal the potential high-level radioactive waste repository at Yucca Mountain. Technologies are evaluated for three basic categories of seal components: backfill (general fill and graded fill), bulkheads, and grout curtains. Not only is placement of seal components assessed, but also preconditioning of the placement area and seal component durability. The approach taken was: First, review selected sealing case histories (literature searches and site visits) from the mining, civil, and defense industries; second, determine whether reasonably available technologies to seal the potential repository exist; and finally, identify deficiencies in existing technologies. It is concluded that reasonably available technologies do exist to place backfill, bulkheads, and grout curtains. Technologies also exist to precondition areas where seal components are to be placed. However, if final performance requirements are stringent for these engineered structures, some existing technologies may need to be developed. Deficiencies currently do exist in technologies that demonstrate the long-term durability and performance of seal components. Case histories do not currently exist that demonstrate the placement of seal components in greatly elevated thermal and high-radiation environments and in areas where ground support (rock bolts and concrete liners) has been removed. The as-placed, in situ material properties for sealing materials appropriate to Yucca Mountain are not available

  13. Fiscal 2000 report on result of R and D of underground storage technology for carbon dioxide; 2000 nendo nisanka tanso chichu choryu gijutsu kenkyu kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    This paper presents the fiscal 2000 results of R and D of underground storage technology for carbon dioxide. As basic experiments, a measurement apparatus was manufactured for simulating the pressure and temperature conditions in aquifers to measure the rate at which CO{sub 2} is dissolved in water and the reactivity between CO{sub 2} and rocks, with the basic performance verified. Methods were investigated and classified that monitor environmental impact and safety. For the purpose of anticipating the long-term behaviors of CO{sub 2} sequestered underground, a simulator was developed, extracting, from investigation of the literature, natural phenomena required for the anticipation. As the system studies, examination was conducted for analysis of the energy balance of the underground storage technology, rational design (safety and economy) of an entire system ranging from source to storage point, investigation from social and economic perspectives, and estimation of the effect of suppressing global warming. In the injection experiment, Minami-Nagaoka natural gas field was selected as a prospective experiment site from the characteristics of the cap rock and aquifer. One injection well was drilled to a depth of 1,230 m, with investigations performed such as physical well-logging and core sampling. Existing data were utilized in the simulation study of CO{sub 2} behavior underground during the injection period. The information of the basic geophysical survey/exploratory well by the Japan National Oil Corporation was collected and compiled, with the preliminary geological study undertaken in the areas described. (NEDO)

  14. Arsenic contamination of underground water in Bangladesh: cause, effect, separation, determination and remedy

    International Nuclear Information System (INIS)

    Ahmed, M.J.

    2003-01-01

    Arsenic contamination of underground water of Bangladesh has become the gravest concern for the lives of millions of people of this land. Probable causes and effects of arsenic contamination of underground water of Bangladesh have been extensively discussed. The extent of current knowledge regarding the specification of arsenic in environmental waters in delineated. A simple, non-extractive, highly sensitive and selective quench photometric methods for the rapid determination of arsenic at trace levels in aqueous medium has been developed. This paper also presents a short review of the technologies used for arsenic removal of underground water in Bangladesh. (author)

  15. Underground dams for irrigation supplies in coastal limestone aquifer, Okinawa, Japan

    Science.gov (United States)

    Yasumoto, J.; Nakano, T.; Nawa, N.

    2011-12-01

    The use of underground dams to store water in regions with arid or tropical climates is a method that has received considerable attention in the last few decades. And now, for the tropical and subtropical islands that are highly vulnerable to climate change underground dams have been attracting attention again as a method of groundwater management. Okinawa Prefecture is Japan's southernmost prefecture, which consists of hundreds of islands in a chain over 1,000 km long, called the Ryukyu Islands which extend southwest from Kyushu to Taiwan. The national irrigation project of the Ryukyu Islands has been carried out, and several underground dams have been constructed. The Komesu and Giiza underground dams are first full scale underground dam facilities constructed for irrigation in Japan. The Komesu underground dam is a salt-water proof type. It prevents salt-water intrusion and provides storage fresh-water for irrigation in coastal limestone aquifer. Giiza underground dam is a dam up type for storage of fresh-water. These groundwater reservoirs are located in the coastal region of southern part of Okinawa (main island), where Ryukyu limestone is extensively distributed. We studied the behaviour of groundwater flow, saltwater intrusion and nitrate nitrogen (NO3-N) in groundwater in this region by using observation data of groundwater and springs through long term (from 1993 to 2010) monitoring. And, a groundwater flow and salt-water intrusion analysis have been conducted with three dimensional numerical model applied to these dam reservoir areas. The MODFLOW-NWT with SWI code and PEST was used to simulate the complex groundwater flow patterns. Through the comparison with simulation and observed data, it was concluded that the cut off wall of underground dams effectively stores the groundwater and prevents the salt-water intrusion in the reservoir areas. The observed groundwater levels at the reservoir areas were almost reproduced by the numerical model, but there

  16. Management of dry flue gas desulfurization by-products in underground mines

    Energy Technology Data Exchange (ETDEWEB)

    Sevim, H.

    1997-06-01

    Disposal of coal combustion by-products (CCBs) in an environmentally sound manner is a major issue facing the coal and utility industries in the US today. Disposal into abandoned sections of underground coal mines may overcome many of the surface disposal problems along with added benefits such as mitigation of subsidence and acid mine drainage. However, many of the abandoned underground coal mines are located far from power plants, requiring long distance hauling of by-products which will significantly contribute to the cost of disposal. For underground disposal to be economically competitive, the transportation and handling cost must be minimized. This requires careful selection of the system and optimal design for efficient operation. The materials handling and system economics research addresses these issues. Transportation and handling technologies for CCBs were investigated from technical, environmental and economic points of view. Five technologies were found promising: (1) Pneumatic Trucks, (2) Pressure Differential Rail Cars, (3) Collapsible Intermodal Containers, (4) Cylindrical Intermodal Tanks, and (5) Coal Hopper Cars with Automatic Retractable Tarping. The first two technologies are currently being utilized in transporting by-products from power plants to disposal sites, whereas the next three are either in development or in conceptualization phases. In this research project, engineering design and cost models were developed for the first four technologies. The engineering design models are in the form of spreadsheets and serve the purpose of determining efficient operating schedules and sizing of system components.

  17. Underground laboratories in Asia

    International Nuclear Information System (INIS)

    Lin, Shin Ted; Yue, Qian

    2015-01-01

    Deep underground laboratories in Asia have been making huge progress recently because underground sites provide unique opportunities to explore the rare-event phenomena for the study of dark matter searches, neutrino physics and nuclear astrophysics as well as the multi-disciplinary researches based on the low radioactive environments. The status and perspectives of Kamioda underground observatories in Japan, the existing Y2L and the planned CUP in Korea, India-based Neutrino Observatory (INO) in India and China JinPing Underground Laboratory (CJPL) in China will be surveyed

  18. Underground laboratories in Asia

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Shin Ted, E-mail: linst@mails.phys.sinica.edu.tw [College of Physical Science and Technology, Sichuan University, Chengdu 610064 China (China); Yue, Qian, E-mail: yueq@mail.tsinghua.edu.cn [Key Laboratory of Particle and Radiation Imaging (Ministry of Education) and Department of Engineering Physics, Tsinghua University, Beijing 100084 China (China)

    2015-08-17

    Deep underground laboratories in Asia have been making huge progress recently because underground sites provide unique opportunities to explore the rare-event phenomena for the study of dark matter searches, neutrino physics and nuclear astrophysics as well as the multi-disciplinary researches based on the low radioactive environments. The status and perspectives of Kamioda underground observatories in Japan, the existing Y2L and the planned CUP in Korea, India-based Neutrino Observatory (INO) in India and China JinPing Underground Laboratory (CJPL) in China will be surveyed.

  19. Delivering construction projects using innovative building technologies

    CSIR Research Space (South Africa)

    Ampofo-Anti, Naalamkai

    2017-07-01

    Full Text Available . Figure 1: IBT delivery flowchart Proceedings 11th Built Environment Conference 6 th August – 8 th August 2017 Delivering construction projects using innovative building technologies Durban, South Africa 5. REFERENCES Ampofo-Anti, N...

  20. Current status of geoscientific studies being conducted by Japan Nuclear Cycle Development Institute in regard to geological disposal of high-level radioactive waste. Pt. 2. Horonobe Underground Research Center

    International Nuclear Information System (INIS)

    Eki, Nobuhiro; Yamazaki, Shinichi

    2004-01-01

    Japan Nuclear Cycle Development Institute (JNC) has been conducting two Underground Research Laboratory (URL) Projects. 'The Long-term Program for Research, Development and Utilization of Atomic Energy (Atomic Energy Commission, 2000)' states their technical and social importance for the Japan's program for the Geological Disposal (GD) of HLW and shows an expectation of earlier execution of the projects. One of the URL projects is Neogene argillaceous sedimentary formation hosted Horonobe URL Project. The aims of the Horonobe URL project are; Presenting concrete geological environment as an example of sedimentary formation, Confirming reliability of technologies for geological disposal of High-Level Radioactive Waste (HLW) by applying them to actual geological condition of sedimentary formation, Providing opportunities to experience the actual deep underground circumstance for the general public. The project is composed of six subjects; 1) development of site characterization methodology, 2) development of monitoring techniques, 3) development of engineering techniques for underground development, 4) neotectonic characterization of the area, 5) development of engineering techniques for designing, construction and operation of a repository, 6) development of safety assessment methodology. The project consists of three phases: investigations form the surface (Phase 1), investigations during construction of the underground facility (Phase 2) and researches using the facility (Phase 3). The total duration is about 20 years. From 2000, surface-based site investigations are going on. In course of the investigations, a series of geophysical surveys has been employed. Along with the town-wide investigation, an area for site-scale investigation was selected, a land for facilities construction was acquired in the area and the land preparation has started in 2003. Geological information gave more detailed and concrete figure of URL, which is composed of three shafts down to

  1. Mitsubishi nuclear technologies and construction of new Bohunice

    International Nuclear Information System (INIS)

    Yoshizu, T.

    2009-01-01

    Mitsubishi Heavy Industries (MHI) has setup Generation III+ category power plant technologies both in large and middle size reactors as a key player in the global market of nuclear plant suppliers. MHI has developed 1,700 MWe class Advanced Pressurized Water Reactor for European utilities, EU-APWR, utilizing the APWR technology in Japan. The plant configuration is based on the proven technologies from MHI's ample experiences, but various advanced technologies are adopted to achieve enhanced safety, reliability, and economy. For the regions without large grid capacity, middle-sized nuclear power plant will be an attractive option for the utilities. Joint Venture ATMEA with AREVA NP will serve ATMEA1. The ATMEA1 will offer 1,100 MWe output with superior operation performance based on reliable and proven technologies. Mitsubishi has experience of half century for all of 26 PWR plants in Japan. The latest plant is Tomari Unit 3 of 1,000 MWe, which has completed the construction work and now in the final commissioning test. Tomari Unit 3 applies some advanced technologies such as all digital I and C, which are to be implemented in the EU-APWR. Based on this construction experience, Mitsubishi can contribute any kind of demands for New Bohunice 5 th unit project with the total engineering capability. (author)

  2. Research in application of mobile diesel equipment in underground mines (III)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    It is third project year on `Application of mobile diesel equipment in underground mines` for providing appropriate measures to improve underground working environment contaminated by the diesel exhaust pollutants. This report consists of 4 articles. 1) The development and site investigation of fume diluter, 2) Development of simulation programs for three dimensional movement of fluid, 3) Study of the local ventilation technology in the working face using diesel equipment, 4) Disaster and hazard prevention research. (author). 22 refs., 19 tabs., 83 figs.

  3. Efficiency of innovative technology in construction industry

    Science.gov (United States)

    Stverkova, H.; Vaclavik, V.

    2017-10-01

    The need for sustainability increasingly influences the development of new technologies, business processes and working practices. Innovations are an important part of all business processes. The aim of innovation is, in particular, to reduce the burden on the environment. The current trend in the construction industry is diamond rope cutting. The aim of the paper is to evaluate the most advanced technology for cutting and removing concrete structures in terms of efficiency.

  4. CONSTRUCTION TECHNOLOGY DIFFUSION IN DEVELOPING COUNTRIES: LIMITATIONS OF PREVAILING INNOVATION SYSTEMS

    Directory of Open Access Journals (Sweden)

    Emilia van Egmond-deWilde de Ligny

    2008-12-01

    Full Text Available The diffusion of innovative technologies in the market is usually a complex and difficult process with a varying degree of success and the effects of the diffused innovative technologies are very un-balanced. The objective of our research is to gain insight into the reasons why the diffusion of innovative technology fails, even though they promise a superior performance compared to incumbent technologies. Drawing on innovation systems theories, we have identified and used the concepts of technological regime, actor network and technology sets to analyze technology diffusion in a case study in the dwelling construction industry in Costa Rica. The results showed bottlenecks in the prevailing innovation system that curtailed the diffusion of an innovative construction technology.

  5. Orpheus in the Underground

    Directory of Open Access Journals (Sweden)

    Puskás Dániel

    2015-12-01

    Full Text Available In my study I deal with descents to the underworld and hell in literature in the 20th century and in contemporary literature. I will focus on modem literary reinterpretations of the myth of Orpheus, starting with Rilke’s Orpheus. Eurydice. Hermes. In Seamus Heaney’s The Underground. in the Hungarian Istvan Baka’s Descending to the Underground of Moscow and in Czesław Miłosz’s Orpheus and Eurydice underworld appears as underground, similarly to the contemporary Hungarian János Térey’s play entitled Jeramiah. where underground will also be a metaphorical underworld which is populated with the ghosts of the famous deceased people of Debrecen, and finally, in Péter Kárpáti’s Everywoman the grave of the final scene of the medieval Everyman will be replaced with a contemporary underground station. I analyse how an underground station could be parallel with the underworld and I deal with the role of musicality and sounds in the literary works based on the myth of Orpheus.

  6. Underground Layout Configuration

    International Nuclear Information System (INIS)

    A. Linden

    2003-01-01

    The purpose of this analysis was to develop an underground layout to support the license application (LA) design effort. In addition, the analysis will be used as the technical basis for the underground layout general arrangement drawings

  7. 40 CFR 280.220 - Ownership of an underground storage tank or underground storage tank system or facility or...

    Science.gov (United States)

    2010-07-01

    ... tank or underground storage tank system or facility or property on which an underground storage tank or underground storage tank system is located. 280.220 Section 280.220 Protection of Environment ENVIRONMENTAL... underground storage tank or underground storage tank system or facility or property on which an underground...

  8. THE IMPACT OF WALL ROUGHNESS OF THE UNDERGROUND AIRWAYS ON THE VALUE OF HYDRAULIC FRICTION FACTOR

    Directory of Open Access Journals (Sweden)

    Vladimir Rendulić

    1991-12-01

    Full Text Available The studies of turbulent flows in round pipes resulted in many hydraulic formulas up to these days, which can also serve in projecting to calculate the resistance to the air flow in underground openings. The report discusses the way of establishing the hydraulic friction factor of untimbered underground workings when the value of equivalent roughness is obtained by measuring the ventilation parameters in a similar working of some other mine. A double reticular nomogram has been constructed for the fast determination of friction coefficient from the known roughness of an underground working (the paper is published in Croatian.

  9. Underground storage with floating cover. An overview; Erdbeckenspeicher mit schwimmender Abdeckung. Eine Uebersicht

    Energy Technology Data Exchange (ETDEWEB)

    Heller, A.; Maureschat, G.; Duer, K. [Technical Univ. of Denmark, Lyngby (Denmark). Dept. of Buildings and Energy

    1998-12-31

    A number of underground stores have been developed in recent years in Denmark. The development has been subsidised with funds of `Development program renewable energy` launched by the Danish Ministry for Environment and Energy. First experience reports on underground storage show that more emphasis must be put on the development of storage sealing and cover construction. Hence research works currently focuses on the investigation of liner material and further development of floating cover constructions. The target is the development of underground storage using solar energy for heating that can compete with conventional heating systems technically and economically. (orig.) [Deutsch] In Daenemark hat man in den letzten Jahren eine Reihe von Erdbeckenspeichern entwickelt. Die Entwicklung wird mit Mitteln aus dem `Entwicklungsprogramm Erneuerbare Energie` vom daenischen Umwelt- und Energieministerium finanziell gefoerdert. Die ersten Erfahrungen mit Erdbeckenspeichern haben gezeigt, dass ein verstaerkter Einsatz bei der Entwicklung von Abdichtungen des Speichers und von Deckelkonstruktionen gefordert ist. Deshalb wird in Daenemark aktuell mit der Untersuchung von Linermaterialien und der Weiterentwicklung von schwimmenden Deckelkonstruktionen gearbeitet. Das Ziel dieser Arbeit ist es, Erdbeckenspeicher zu entwickeln, die die Ausnutzung von Sonnenenergie zur Waermeversorgung im Vergleich mit herkoemmlicher Waermeversorgung sowohl technisch als auch oekonomisch konkurrenzfaehig macht. (orig.)

  10. Mizunami Underground Research Laboratory project. Rock mechanical investigations annual report for fiscal year 2013

    International Nuclear Information System (INIS)

    Sato, Toshinori; Sanada, Hiroyuki; Tanno, Takeo

    2015-02-01

    In order to establish the scientific and technical basis for geological disposal of technology, Japan Atomic Energy Agency (JAEA) is pursuing the geoscientific research project namely the Mizunami Underground Research Laboratory (MIU) in the crystalline rock environment at Tono Geoscience Center (TGC). In the MIU Project, geoscientific research is being carried out in three overlapping phases; Surface-based Investigation Phase (Phase I: FY1996 - 2004), Construction Phase (Phase II: FY2004- in progress) and Operation Phase (Phase III: FY2010- in progress). In the rock mechanical investigations at the Phase II, the research aims at “Characterization of geological environment in the Excavation Disturbed Zone (EDZ)” from the viewpoint of safety assessment. For the research, the specific information of the EDZ such as (1) size and structures, (2) petrophysical/geomechanical properties, and (3) stress state are required. The research also aims at “Characterization of geomechanical stability around tunnel” from the viewpoint of design and construction of underground facilities. For the research, the specific information such as (4) local stress regime, (5) spatial variability of petrophysical/geomechanical properties of rocks, and (6) distribution of discontinuities intersecting underground tunnels are required. The measurement system for rock mass behavior has been manufactured and set for groundwater recovery experiment in the Phase III. This report presents the results of following rock mechanical investigations conducted in FY 2013. In-situ stress measurements using Compact Conical-ended Borehole Overcoring Technique were performed at the - 500m stage. Measurement system for rock mass displacement using optical fiber was installed at the - 500m stage as part of the groundwater recovery experiment. Study on the modeling based on equivalent continuum model was continued. Phenomenological study and theoretical study on long-term behavior of crystalline rock were

  11. Enhanced Geothermal Systems (EGS) well construction technology evaluation report.

    Energy Technology Data Exchange (ETDEWEB)

    Capuano, Louis, Jr. (Thermasource Inc.); Huh, Michael; Swanson, Robert (Thermasource Inc.); Raymond, David Wayne; Finger, John Travis; Mansure, Arthur James; Polsky, Yarom; Knudsen, Steven Dell

    2008-12-01

    Electricity production from geothermal resources is currently based on the exploitation of hydrothermal reservoirs. Hydrothermal reservoirs possess three ingredients critical to present day commercial extraction of subsurface heat: high temperature, in-situ fluid and high permeability. Relative to the total subsurface heat resource available, hydrothermal resources are geographically and quantitatively limited. A 2006 DOE sponsored study led by MIT entitled 'The Future of Geothermal Energy' estimates the thermal resource underlying the United States at depths between 3 km and 10 km to be on the order of 14 million EJ. For comparison purposes, total U.S. energy consumption in 2005 was 100 EJ. The overwhelming majority of this resource is present in geological formations which lack either in-situ fluid, permeability or both. Economical extraction of the heat in non-hydrothermal situations is termed Enhanced or Engineered Geothermal Systems (EGS). The technologies and processes required for EGS are currently in a developmental stage. Accessing the vast thermal resource between 3 km and 10 km in particular requires a significant extension of current hydrothermal practice, where wells rarely reach 3 km in depth. This report provides an assessment of well construction technology for EGS with two primary objectives: (1) Determining the ability of existing technologies to develop EGS wells. (2) Identifying critical well construction research lines and development technologies that are likely to enhance prospects for EGS viability and improve overall economics. Towards these ends, a methodology is followed in which a case study is developed to systematically and quantitatively evaluate EGS well construction technology needs. A baseline EGS well specification is first formulated. The steps, tasks and tools involved in the construction of this prospective baseline EGS well are then explicitly defined by a geothermal drilling contractor in terms of sequence, time and

  12. Research on the technologies of cracking-resistance of mass concrete in subway station

    Science.gov (United States)

    Sheng, Yanmin; Li, Shujin; Jiang, Guoquan; Shi, Xiaoqing; Yang, Zhu; Zhu, Zhihang

    2018-03-01

    This paper takes the theory of multi-field coupling and the model of hydration-temperature-humidity-constraint to assess the effect of cracking-resistance on structural concrete and optimize the controlling index of crack resistance. The effect is caused by structure, material and construction, etc. The preparation technology of high cracking-resistance concrete is formed through the researching on the temperature rising and deformation over the controlling influence of new anti-cracking materials and technologies. A series of technologies on anti-cracking and waterproof in underground structural concrete of urban rail transit are formed based on the above study. The technologies include design, construction, materials and monitoring. Those technologies are used in actual engineering to improve the quality of urban rail transit and this brings significant economic and social benefits.

  13. EMMA: A new underground cosmic-ray experiment

    International Nuclear Information System (INIS)

    Enqvist, T; Foehr, V; Joutsenvaara, J; Jaemsen, T; Keraenen, P; Kuusiniemi, P; Laitala, H; Lehtola, M; Mattila, A; Narkilahti, J; Peltoniemi, J; Remes, H; Reponen, M; Raeihae, T; Sarkamo, J; Shen, C; Vaittinen, M; Zhang, Z; Ding, L; Zhu, Q; Roos, M; Dzaparova, I; Karpov, S; Kurenya, A; Petkov, V; Yanin, A; Fynbo, H

    2006-01-01

    A cosmic-ray experiment of new type is under construction in the Pyhaesalmi mine in the underground laboratory of the University of Oulu, Finland. It aims to study the composition of cosmic rays at and above the knee region (energy above 1 PeV). The experiment, called EMMA, covers about 150 m 2 of detector area, and the setup is capable of measuring the multiplicity and the lateral distribution of underground muons, and the arrival direction of the air shower. The detector is placed at the depth of about 85 metres (corresponding about 240 mwe) which gives a threshold energy of muons of about 45 GeV. The rock overburden filters out all other particles of the air shower except the high-energy muons. These high-energy muons originate at high altitudes close to the first interaction of the primary cosmic ray and they carry more information about the primary than low-energy muons. The full-size detector is supposed to run by the end of 2007

  14. The Performance Parameters Of Wireless Sensor Networks In Underground Mines

    Directory of Open Access Journals (Sweden)

    Sinan UGUZ

    2015-08-01

    Full Text Available In recent years underground mines have increasingly remained on the agenda with both difficult working conditions and problems such as collapsed and firedamp explosion in our country and in the world. In terms of life safety of miners and their health mine sites are required to be continuously monitored and controlled. This is difficult to achieve with existing wired systems due to the topography of mine sites. The applications have increased with the development of wireless sensor networks WSN technology in mine sites in recent years. This case has also caused an increase in studies on improving WSN performance. Especially energy efficiency is very important for the WSN hardware with a low energy source. In this study information about things to consider while using WSN technologies in underground mines and studies on their performance has been provided.

  15. Underground laboratories in Europe

    International Nuclear Information System (INIS)

    Coccia, E

    2006-01-01

    The only clear evidence today for physics beyond the standard model comes from underground experiments and the future activity of underground laboratories appears challenging and rich. I review here the existing underground research facilities in Europe. I present briefly the main characteristics, scientific activity and perspectives of these Laboratories and discuss the present coordination actions in the framework of the European Union

  16. Backfilling behavior of a mixed aggregate based on construction waste and ultrafine tailings.

    Science.gov (United States)

    Chen, Qiusong; Zhang, Qinli; Xiao, Chongchun; Chen, Xin

    2017-01-01

    To study the possibility of utilizing mixed construction waste and ultrafine tailings (CW&UT) as a backfilling aggregate that can be placed underground in a mine, physicochemical evaluation, proportioning strength tests, and pumpability experiments were conducted. It was revealed that mixed CW&UT can be used as a backfilling aggregate due to the complementarities of their physicochemical properties. In addition, as the results of the proportioning strength tests show, the compressive strength of a cemented CW&UT backfilling specimen cured for 28 days, with a mass fraction of 72-74%, a cement-sand ratio of 1:12, and a CW proportion of 30%, is higher than 1.0 MPa, which meets the safety requirements and economic consideration of backfilling technology in many underground metal mines, and can also be enhanced with an increase in the cement-sand ratio. The results of the pumpability experiments show that cemented backfilling slurry based on CW&UT can be transported to the stope underground with a common filling pump, with a 16.6 MPa maximum pressure, with the condition that the time of emergency shut-down is less than approximately 20 min. All in all, the research to utilize mixed CW&UT as a backfilling aggregate can not only provide a way to dispose of CW&UT but also will bring large economic benefits and can provide constructive guidance for environmental protection.

  17. Synergic and conflicting issues in planning underground use to produce energy in densely populated countries, as Italy

    International Nuclear Information System (INIS)

    Quattrocchi, Fedora; Boschi, Enzo; Spena, Angelo; Buttinelli, Mauro; Cantucci, Barbara; Procesi, Monia

    2013-01-01

    Highlights: ► In densely populated countries, the public need a synergic approach to produce low-carbon energy. ► The paper is mapping coexistent and different underground technologies to produce low-GHG energy. ► The paper calculate Energy Density Potential in Land – EDPL in terms of [GW h/ha/year]. ► Draw-plate technologies platforms (EU-ZEP, etc.) should merge using underground together. ► Synergies among the different uses of deep underground (up to 5000 m) jointing the energy lobbies. -- Abstract: In densely populated countries there is a growing and compelling need to use underground for different and possibly coexisting technologies to produce “low carbon” energy. These technologies include (i) clean coal combustion merged with CO 2 Capture and Storage (CCS); (ii) last-generation nuclear power or, in any case, safe nuclear wastes disposal, both “temporary” and “geological” somewhere in Europe (at least in one site): Nuclear wastes are not necessarily associated to nuclear power plants; (iii) safe natural gas (CH 4 ) reserves to allow consumption also when the foreign pipelines are less available or not available for geopolitical reasons and (iv) “low-space-consuming” renewables in terms of Energy Density Potential in Land (EDPL measured in [GW h/ha/year]) as geothermics. When geothermics is exploited as low enthalpy technology, the heat/cool production could be associated, where possible, to increased measures of “building efficiency”, low seismic risks building reworking and low-enthalpy heat managing. This is undispensable to build up “smart cities”. In any case the underground geological knowledge is prerequisite. All these technologies have been already proposed and defined by the International Energy Agency (IEA) Road Map 2009 as priorities for worldwide security: all need to use underground in a rational and safe manner. The underground is not renewable in most of case histories [10,11]. IEA recently matched and

  18. Management of dry flue gas desulfurization by-products in underground mines. Annual report, October 1994--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    Chugh, Y.P.; Dutta, D.; Esling, S. [and others

    1995-10-01

    On September 30, 1993, the U.S. Department of Energy-Morgantown Energy Technology Center (DOE-METC) and Southern Illinois University at Carbondale (SIUC) entered into a cooperative research agreement entitled {open_quotes}Management of Dry Flue Gas Desulfurization By-Products in Underground Mines{close_quotes} (DE-FC21-93MC30252). Under the agreement Southern Illinois University at Carbondale will develop and demonstrate several technologies for the placement of coal combustion residues (CCBs) in abandoned coal mines, and will assess the environmental impact of such underground CCB placement. This report describes progress in the following areas: environmental characterization, mix development and geotechnical characterization, material handling and system economics, underground placement, and field demonstration.

  19. Study of the retrievability of radioactive waste from a deep underground disposal facility

    International Nuclear Information System (INIS)

    Heijdra, J.J.; Bekkering, J.; Gaag, J. van der; Kleyn, P.H. van der; Prij, J.

    1993-11-01

    In the reporting period the main activities have been the detailed set-up of a planning for the underground facilities. This planning has been produced in such a manner that modification in the underground facilities can easily be incorporated. The basic planning has been set up as a series of computer spread sheets which break down the construction of the mine into elementary cost- and activity centres. The principles, assumptions and models which underlay these planning are given, and a selection and evaluation of the retrieval method has been performed. (orig.)

  20. The role of underground construction for the mobility, quality of life and economic and social sustainability of urban regions

    Directory of Open Access Journals (Sweden)

    Manuel Luís Tender

    Full Text Available Abstract Tunnelling has been used for several purposes for thousands of years. In the coming years the world's population will increase in the urban areas. So, the urban centres will have to adapt, in order to guarantee that their future population will have the necessary and sustainable growth. Due to the constraints for surface construction, also connected to environmental issues, this population growth will imply a greater use of the underground. With this optimal growth, the population of the cities will have better mobility, quality of life, and economic and social sustainability. In a first phase, this report will present a historic approach to tunnelling and its foreseeable future. Afterwards, we will present some considerations on the three factors which tunnelling impacts: mobility, quality of life and social sustainability. As a case study, we will analyse the 2nd phase of the construction of the Marão Tunnel (TDM - the longest ever built in the Iberian Peninsula- and describe the options made regarding each of those factors. In this case study, the options implemented made it possible to successfully execute the works. For the industry, this work is important because it describes a successful management of the aspects under analysis.

  1. MONITORING AND CONTROLLING ON SURFACE SETTLEMENT IN SAND AND GRAVEL STRATA CAUSED BY SUBWAY STATION CONSTRUCTION APPLYING PIPE-ROOF PRE-CONSTRUCTION METHOD (PPM

    Directory of Open Access Journals (Sweden)

    Xian Yang

    2017-07-01

    Full Text Available Pipe-roof Pre-construction Method (PPM is regarded as a safer method to construct underground space, especially suitable for the construction sites with dense surface buildings, underground pipelines and complicated geological conditions. Xinleyizhi Station of Shenyang Metro constructed by PPM. In order to ensure safety in construction, the whole construction process was closely monitored. In this paper, monitoring results of surface settlement in PPM is analyzed. According to the monitoring results, the most serious settlement occurred in pipes jacking, which was the first and the most crucial step in PPM. The settlement reasons in each step are discussed, and controlling methods of surface settlement in each step are elaborated. Through close monitoring and timely control, the construction of Xinleyizhi Station completed smoothly. Because of the obvious advantages of PPM, the method will be used more widely in construction of shallow buried excavation under complicated surrounding and geological conditions.

  2. Earthquakes: no danger for deep underground nuclear waste repositories

    International Nuclear Information System (INIS)

    2010-03-01

    On the Earth, the continental plates are steadily moving. Principally at the plate boundaries such shifts produce stresses which are released in form of earthquakes. The highest the built-up energy, the more violent will be the shaking. Earthquakes accompany mankind from very ancient times on and they disturb the population. Till now nobody is able to predict where and when they will take place. But on the Earth there are regions where, due to their geological situation, the occurrence of earthquakes is more probable than elsewhere. The impact of a very strong earthquake on the structures at the Earth surface depends on several factors. Besides the ground structure, the density of buildings, construction style and materials used play an important role. Construction-related technical measures can improve the safety of buildings and, together with a correct behaviour of the people concerned, save many lives. Earthquakes are well known in Switzerland. Here, the stresses are due to the collision of the African and European continental plates that created the Alps. The impact of earthquake is more limited in the underground than at the Earth surface. There is no danger for deep underground repositories

  3. Radon and NO2 levels and related environmental factors in 100 underground subway platforms over two-year period.

    Science.gov (United States)

    Hwang, Sung Ho; Park, Jae Bum; Park, Wha Me

    2018-01-01

    In this study, the environmental factors that affect radon (Rn) and nitrogen dioxide (NO 2 ) levels in subway-station underground platforms are evaluated, and the outdoor NO 2 levels are compared with those obtained for the underground platforms. The Rn and NO 2 levels from May 2013 to September 2015 are determined for lines 1-4 of the Seoul Metro, via calculation of the arithmetic means of the Rn and NO 2 levels with their standard deviations (SDs). The underground Rn levels in 2013 are found to be significantly higher than those recorded in 2015 for the Seoul Metro. In addition, the Rn levels are related to the station depth and construction year. Further, the underground NO 2 levels are shown to be significantly higher than the outdoor levels for all four Seoul Metro subway lines. The Rn levels are also found to vary significantly between months, and are shown to increase gradually with depth from 8 to 20 m. The Rn levels are also higher for stations constructed in the 1980s. Therefore, stricter monitoring of Rn level may be required for stations constructed in the 1980s and/or having platform depths within the 8-20 m range. Island-type platform stations based on granite areas may also require careful attention. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. Technological aspects of lift-slab method in high-rise-building construction.

    Science.gov (United States)

    Gaidukov, Pavel V.; Pugach, Evgeny M.

    2018-03-01

    The utilization efficiency of slab lifting technology for high-rise-building construction is regarded in the present article. The main problem of the article is organizing technology abilities indication, which proves the method application possibility. There is the comparing of lifting technologies and sequential concrete-frame extension, as follows: the first one: the parameters are defined, and the second one: the organizational model is executed. This model defines borders of the usage methods, as well. There is the mathematic model creating, which describes boundary conditions of the present technologies usage. This model allows to predict construction efficiency for different stored-number buildings.

  5. Initial investment to 3D printing technologies in a construction company

    OpenAIRE

    Cernohorsky, Zdenek; Matejka, Petr

    2017-01-01

    This article deals with an initial investment to 3D printing technologies in a construction company. The investment refers to the use of building information models and their integration with 3D printing technology within a construction company. In the first part, there will be discussed an introduction of 3D printing scheme in a construction company from a lifecycle perspective in general. As a part of this scheme, the ideal variant of an initial investment will be considered a.k.a a pilot p...

  6. Complex engineering objects construction using Multi-D innovative technology

    International Nuclear Information System (INIS)

    Agafonov, Alexey

    2013-01-01

    Multi-D technology is an integrated innovative project management system for a construction of complex engineering objects based on a construction process simulation using an intellectual 3D model. Multi-D technology includes: • The unified schedule of E+P+C; • The schedule of loading of human resources, machines & mechanisms; • The budget of expenses and the income integrated with the schedule; • 3D model; • Multi-D model; • Weekly-daily tasks (with 4th level schedules); • Control system of interaction of Customer-EPC(m) company - Contractors; • Change and configuration management system

  7. Evaluation of the effects of underground water usage and spillage in the Exploratory Studies Facility

    International Nuclear Information System (INIS)

    Dunn, E.; Sobolik, S.R.

    1993-12-01

    The Yucca Mountain Site Characterization Project is studying Yucca Mountain in southwestern Nevada as a potential site for a high-level radioactive waste repository. Analyses reported herein were performed to support the design of site characterization activities so that these activities will have a minimal impact on the ability of the site to isolate waste and a minimal impact on underground tests performed as part of the characterization process. These analyses examine the effect of water to be used in the underground construction and testing activities for the Exploratory Studies Facility on in situ conditions. Underground activities and events where water will be used include construction, expected but unplanned spills, and fire protection. The models used predict that, if the current requirements in the Exploratory Studies Facility Design Requirements are observed, water that is imbibed into the tunnel wall rock in the Topopah Springs welded tuff can be removed over the preclosure time period by routine or corrective ventilation, and also that water imbibed into the Paintbrush Tuff nonwelded tuff will not reach the potential waste storage area

  8. Horonobe underground research laboratory project investigation report for the 2005 fiscal year

    International Nuclear Information System (INIS)

    Matsui, Hiroya; Niizato, Tadafumi; Yamaguchi, Takehiro

    2006-11-01

    The investigations in 2005 fiscal year (2005/2006) were focused on the Hokushin area, which was selected as the area for laboratory construction. The main investigation region extends over approximately 3 km x 3 km. Geophysical, geological and surface hydrogeological investigations are carried out to acquire the geoscientific data needed to develop techniques for investigating the geological environment. And the borehole investigation at HDB-11 was finished in 2005. About development of techniques for long-term monitoring of the geological environment, long-term monitoring systems were operative in boreholes drilled in a previous investigation, and were also installed in the remaining boreholes (HDB-9, 10; drilled in 2004). A remotely operated monitoring system (ACROSS) was also installed and tested. About study on long-term stability of the geological environment, for tracing tectonic changes at Horonobe, geological survey and ground penetrating radar were carried out. Observations using seismograph, global positioning system (GPS) and electromagnetic exploration system installed until 2006 were continuing. About improving the reliability of disposal technology, laboratory tests of low alkaline concrete, shotcrete test at full-size simulated tunnel were carried out. Applicability confirmation of EBS designing methods was carried out with geological environmental data of Phase 1. About sophistication of safety assessment methodologies, Sorption test using drill core was carried out. Solute transport analysis was also carried out. In parallel with these investigations, Phase 2 investigation program were planned. About surface facility, Research and Administration Facility and Test Facility were constructed and started to use since February 2006. Public information house was begun to construct. About underground facility, temporary surplus soil (muck) yard was constructed. Surplus soil yard and drainage line were designed. These caused by toxic substance founded in

  9. The Deep Underground Science and Engineering Laboratory at Homestake

    Energy Technology Data Exchange (ETDEWEB)

    Lesko, Kevin T [Department of Physics, University of California Berkeley and the Institute for Nuclear and Particle Astrophysics, Lawrence Berkeley National Laboratory, 1 Cyclotron Road, MS50R5239, Berkeley, CA 94720-8146 (United States)], E-mail: KTLesko@lbl.gov

    2008-11-01

    The National Science Foundation and the international underground science community are well into establishing a world-class, multidisciplinary Deep Underground Science and Engineering Laboratory (DUSEL) at the former Homestake mine in Lead South Dakota. The NSF's review committee, following the first two NSF solicitations, selected the Homestake Proposal and site as the prime location to be developed into an international research facility. Homestake DUSEL will provide much needed underground research space to help relieve the worldwide shortage, particularly at great depth, and will develop research campuses at several different depths to satisfy the research requirements for the coming decades. The State of South Dakota has demonstrated remarkable support for the project and has secured the site with the transfer from the Homestake Mining Corp. The State, through its Science and Technology Authority with state funds and those of a philanthropic donor has initiated rehabilitation of the surface and underground infrastructure including the Ross and Yates hoists accessing the 4850 Level (feet below ground, 4100 to 4200 mwe). The scientific case for DUSEL and the progress in establishing the preliminary design of the facility and the associated suite of experiments to be funded along with the facility by the NSF are presented.

  10. Characteristics of PM10 and CO2 concentrations on 100 underground subway station platforms in 2014 and 2015

    Science.gov (United States)

    Hwang, Sung Ho; Park, Wha Me; Park, Jae Bum; Nam, Taegyun

    2017-10-01

    In this study, the concentrations of particulate matter 10 μm or less in diameter (PM10) and carbon dioxide (CO2) were measured in 100 underground subway stations, and the potential health risks of PM10, and environmental factors affecting these concentrations were analyzed. The concentrations were measured from May 2014 to September 2015 in stations along Seoul Metro lines 1-4. There were significantly different PM10 concentrations among the underground subway stations along lines 1, 2, 3, and 4. The PM10 concentrations were associated with the CO2 concentrations, construction years, station depths, and numbers of passengers. The underground PM10 concentrations were significantly higher than the outdoor PM10 concentrations. In addition, the PM10 concentrations were higher in the stations that were constructed in the 1970s than in those constructed after the 1970s. The PM10 and CO2 concentrations varied significantly, depending on the construction year and number of passengers. The hazard quotient is higher than the acceptable level of 1.0 μg kg-1 day for children, indicating that they are at risk of exposure to unsafe PM10 levels when travelling by the metro. Therefore, stricter management may be necessary for the stations constructed in the 1970s as well as those with higher numbers of passengers.

  11. Stability of underground excavations in a repository system

    International Nuclear Information System (INIS)

    Calash, A.Y.; Greer, J.C.; Andrea, S.J.; Chowdhury, A.H.; Nguyen, V.V.

    1988-01-01

    The DOE is investigating the feasibility of constructing a deep geologic repository at the Hanford Site, Washington, for the permanent disposal of nuclear waste. The underground openings associated with the repository design include shafts, tunnels, emplacement rooms and boreholes. The stability of these underground openings, the extent and characteristics of the disturbed zones due to excavation, and their effects on groundwater flow path and travel time have a primary influence on the performance assessment of the Hanford Site as a nuclear waste repository. This study is being done in accordance with the requirements of the NRC. Results of structural analyses of shafts and tunnels under in situ stresses and/or medium weight are presented in this paper. Four different analyses were carried out to analyze the shaft: a plane strain model, axisymmetric model, 3-D model of a single material medium, and 3-D model of a three material medium

  12. Application of RFID combined with blockchain technology in logistics of construction materials

    Directory of Open Access Journals (Sweden)

    Lanko A.

    2018-01-01

    Full Text Available Nowadays, almost none of the fields of human activity can do without supply chain management. In addition, implementation of one in construction companies contributes to major economic benefits. The article considers the application feasibility of blockchain in logistics of construction materials through the usage of RFID technology. An example of introduction to the process of manufacturing and delivery of ready-mixed concrete is given. The main advantages, shortcomings, perspectives, as well as difficulties arising in the implementation of blockchain technology in the construction industry are described. Special attention is paid to the applicability of these technologies.

  13. Filter construction technology in mining drilling hole for in-situ leaching of multilayer deposit

    International Nuclear Information System (INIS)

    Jiang Yan; Hu Baishi; Tan Yahui; Yang Lizhi; Li Xiaojian; Wang Xiaodong; Chang Jingtao; Qin Hao

    2014-01-01

    Taking a typical multilayer sandstone uranium deposit as example, study was carried out on filter construction technology in mining drilling hole for in-situ leaching of multilayer deposit. According to the character of multilayer sandstone, four injecting holes and one drawning hole were designed between the P13-P15 exploration lines, five different methods were used to construct filter. Construction technology by different methods was introduced and the advantages and disadvantages of the construction filter with five methods were analysed. As far as five experimental drilling holes, layered gravel-filling hole construction technology is a suitable method for construction multilayer filter with continuous construction, simple operation and good effect of well completion. (authors)

  14. Proceedings of the establishment conference of Professional Committee on Waste Underground Disposal of Chinese Society for Rock Mechanics and Engineering and the first academic seminar

    International Nuclear Information System (INIS)

    2006-07-01

    Approved by the China Association for Science and Technology, Chinese Society for Rock Mechanics and Engineering newly established 'Professional Committee on Waste Underground Disposal'. The committee will organise the national and international academic exchange, and provide advice on discipline development, sustainable industrial development, environmental protection, etc.. This is the establishing conference of the professional committee, as well as the first academic seminar. The following topics on waste underground disposal are discussed: the theory, practice and exploration, project examples, new technologies and new methods. The contents include: waste disposal technology in the new century, the geological disposal of high level radioactive waste, LLW and ILW underground waste disposal, urban and industrial waste underground disposal, and etc.

  15. In situ tests for investigating thermal and mechanical rock behaviors at an underground research tunnel

    International Nuclear Information System (INIS)

    Kwon, Sangki; Cho, Won-Jin

    2013-01-01

    The understanding of the thermal and mechanical behaviors expected to be happened around an underground high-level radioactive waste (HLW) repository is important for a successful site selection, construction, operation, and closure of the repository. In this study, the thermal and mechanical behaviors of rock and rock mass were investigated from in situ borehole heater test and the studies for characterizing an excavation damaged zone (EDZ), which had been carried out at an underground research tunnel, KURT, constructed in granite for the validation of a HLW disposal concept. Thermal, mechanical, and hydraulic properties in EDZ could be predicted from various in situ and laboratory tests as well as numerical simulations. The complex thermo-mechanical coupling behavior of rock could be modeled using the rock properties. (author)

  16. Using underground mine Karst water to solve water supply problem in underground mine

    Energy Technology Data Exchange (ETDEWEB)

    Wang, W. [Wanbei Mining Administration (China). Liuqiao No. 2 Mine

    1995-05-01

    There is a very rich karst water resource under the Liuqiao No. 2 underground mine. Under normal mining conditions the drainage is 546 m{sup 3}/h while the maximum drainage is up to 819 m{sup 3}/h. If water inrush occurred from a broken zone of a fault or a sinkhole of the karst, the flow could be up to 3269 m{sup 3}/h. The karst water is of good quality and high in pressure. The water head pressure at -400 m level is about 3.5 MPa. To save mine construction cost, it was decided that the water supply for coal production equipment, mining operation and mine fire control was to be changed from the surface to the underground by drilling a water well to tap the karst water resource. A water well with a depth of 63.3 m was drilled in the -400 m transportation roadway. The diameter of the well is 127 mm and it has a casing pipe with a diameter of 108 mm which is connected to the water supply pipeline. The pressure of the water supply is measured at 23.5 MPa and the water flow rate is 252 m{sup 3}/h. The establishment of the water supply system has achieved great cost saving for Liuqiao No. 2 Mine. 2 figs.

  17. Development of construction technology for nuclear power plants

    International Nuclear Information System (INIS)

    Schnellenbach, G.

    1975-01-01

    Stringent safety requirements for nuclear power plants create new technological problems in their construction. The development is influenced by the mode of operation of the respective reactors which leads to different construction styles of the reactor buildings. Accomodation of extraordinary load cases such as earthquake, airplane crash, and blast due to chemical explosions, requires additional treatment. Significant new problems arise for the prestressed concrete reactor pressure vessels and concrete containments, prestressed or reinforced. (orig.) [de

  18. Underground coal mining - methods, equipment developments and trends

    Energy Technology Data Exchange (ETDEWEB)

    Singhal, R

    1988-12-01

    Underground mines are truly beginning to accept the so-called 'high tech' technology evident in other industries. Automation, remote control and robotics have taken an added significance. Wireless communication, mine-wide equipment health and performance monitoring, and transmission of data from deeper levels to surface is moving towards becoming the norm. There is emphasis on developing and applying continuous mining systems, as well as on modifying cyclical discontinuous methods to continuous systems. Multi-purpose equipment is also being developed. Technology transfer is playing its role - equipment and systems from surface coal mining are being applied to underground mining and vice-versa. At the American Mining Congress Exhibition held in Chicago in April 1988, a variety of equipment for underground mining was displayed including coal face equipment such as shearer loaders, conveyors and powered supports, and equipment for room-and-pillar coal mining. The trend continues to be towards high power machines equipped with a variety of electronics and sensors, safety devices, and alarm systems. Ancillary equipment on display covered a variety of cutting drums, cutting tools, conveying equipment and so on. In room-and-pillar mining, the overall emphasis was on moving away from the cyclical nature of the work. Transportation by shuttle cars must be replaced by continuous transport systems such as conveyors. Experience from Australia has shown that the application of continuous haulage and breaker line supports has permitted a doubling of production from room-and-pillar systems. Production levels of 3,000tpd have already been achieved, and 4,000tpd is considered achievable.

  19. Pedestrian detection for underground mine vehicles using thermal images

    CSIR Research Space (South Africa)

    Dickens, JS

    2011-09-01

    Full Text Available , ?Proximity detection,? August 2010. [On- line]. Available: http://www.cdc.gov/niosh/mining/topics/ topicpage58.htm [4] P. Laliberte?, ?Summary study of underground commu- nications technologies,? CANMET Mining and Mineral Sciences Laboratories, Tech. Rep... Institute of Mining and Metallurgy, vol. 101, no. 3, pp. 127?134, May 2001. [12] W. M. Marx and R. M. Franz, ?Determine appropriate criteria for acceptable environmental conditions,? CSIR: Division of Mining Technology, DeepMine Research Task 6...

  20. Joint Rapid Airfield Construction (JRAC) 2007 Technology Demonstration

    National Research Council Canada - National Science Library

    Anderton, Gary L; Berney, IV, Ernest S; Mann, Travis A; Newman, J. K; Baylot, E. A; Miller, Daniel K; Mason, Quint

    2008-01-01

    ...) unsurfaced runway and two 45,480-ft2 (4,225-m2) aircraft parking aprons with associated connector taxiways, all using JRAC technologies focused on rapid construction with reduced logistics and increased system reliability...

  1. Development of grouting technologies for geological disposal of high level waste in Japan (1). Overall program and application of developed technologies

    International Nuclear Information System (INIS)

    Fujita, Tomoo; Sasamoto, Hiroshi; Sugita, Yutaka; Matsui, Hiroya

    2013-01-01

    The Japan Atomic Energy Agency started a grout project for geological disposal of high-level radioactive waste (HLW) in 2007. The aim of the project was to develop new grouting technologies and grout materials and also to develop models for performance assessments, prediction of the long-term radionuclide migration and identify detrimental changes in the host rock by the grout material leachate. This study presents the overall program and the application of key engineering technologies to the construction and operation of an underground facility for the geological disposal of HLW, with particular emphasis on the long-term effects of grout materials. (author)

  2. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    Science.gov (United States)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  3. ONKALO. Underground characterisation and research programme (UCRP)

    International Nuclear Information System (INIS)

    2003-09-01

    The purpose of the ONKALO Underground Characterisation and Research Programme (UCRP) is to explore Olkiluoto rock conditions and thereby enhance the current geoscientific understanding of the site, to allow the submission of an application for a construction licence for the deep repository. The characterisation programme has the following geoscientific goals: to develop and demonstrate techniques for detailed characterising volumes of rock from the underground, to update the current descriptive model of Olkiluoto bedrock and to increase confidence in this model such that it will serve the needs of construction and the Preliminary Safety Assessment Report (PSAR) in the construction licence application, and to identify volumes of rock that could be suitable for housing parts of the repository. The development of ONKALO will be based on coordinated investigation, design and construction activities. Mapping data from the tunnel front and data obtained from short probe holes will constitute most of the data needed to control the construction of ONKALO. Pilot holes will be drilled along the tunnel profile as the excavation proceeds and investigations will be carried out for geological, rock mechanics, hydrogeological and hydrogeochemical characterisation. Investigations cover more detailed mapping and sampling in parts of the tunnel, mapping and sampling of potential groundwater inflows to the tunnel and investigations from characterisation bore holes drilled from ONKALO. In addition, monitoring is planned in surface-drilled boreholes, in boreholes drilled from ONKALO, and in ONKALO itself. Monitoring will reveal changes in bedrock conditions and thus provide important information for site characterisation. The information collected by characterisation and monitoring will all be assessed in an integrated modelling effort. The aim of this modelling is both to successively enhance the description and understanding of the rock volume around ONKALO and to assess potential

  4. Global Pursuits: The Underground Railroad

    Science.gov (United States)

    School Arts: The Art Education Magazine for Teachers, 2004

    2004-01-01

    This brief article describes Charles T. Webber's oil on canvas painting, "The Underground Railroad, 1893." The subject of this painting is the Underground Railroad, which today has become an American legend. The Underground Railroad was not a systematic means of transportation, but rather a secretive process that allowed fugitive slaves…

  5. The art of the technology: construction of structures by domed ceramic with industrial systems

    Directory of Open Access Journals (Sweden)

    J. Trias de Bes

    2016-12-01

    Full Text Available The reconciliation between traditional construction and new technologies encourage the development of a new catalonian vaulted through prefabrication technology of reinforced concrete in which it is incorporated in the construction process a ceramic fabric. The example of a prototype house with this system is shown. The article presents two fundamental considerations: a Expose the influence of the imagery of traditional techniques as motivation and activation of technological construction processes, and b confront System Vs. Skill as a constructive belonging to the Technical and Technology, respectively. In this sense, the article concludes by highlighting that humanism is involved between both as a determinant factor in the architectural design process.

  6. Rokibaar Underground = Rock bar Underground

    Index Scriptorium Estoniae

    2008-01-01

    Rokibaari Underground (Küütri 7, Tartu) sisekujundus, mis pälvis Eesti Sisearhitektide Liidu 2007. a. eripreemia. Sisearhitekt: Margus Mänd (Tammat OÜ). Margus Männist, tema tähtsamad tööd. Plaan, 5 värv. vaadet, foto M. Männist

  7. Geological investigations for geological model of deep underground geoenvironment at the Mizunami Underground Research Laboratory (MIU)

    International Nuclear Information System (INIS)

    Tsuruta, Tadahiko; Tagami, Masahiko; Amano, Kenji; Matsuoka, Toshiyuki; Kurihara, Arata; Yamada, Yasuhiro; Koike, Katsuaki

    2013-01-01

    Japan Atomic Energy Agency (JAEA) is performing a geoscientific research project, the Mizunami Underground Research Laboratory (MIU) project, in order to establish scientific and technological basis for geological disposal of high-level radioactive wastes. The MIU is located in crystalline rock environment, in Mizunami City, central Japan. Field investigations include geological mapping, reflection seismic surveys, several borehole investigations and geological investigations in the research galleries to identify the distribution and heterogeneity of fractures and faults that are potential major flowpaths for groundwater. The results of these field investigations are synthesized and compiled for the purpose of geological modeling. The field investigations indicate that the Main Shaft at the MIU intersected low permeability NNW oriented faults. A high permeability fracture zone in the granite, a significant water inflow point, was observed in the Ventilation Shaft. Development of the geological model focusing 3D spatial relationships at different scales and evolution of the geoenvironment are underway. This paper describes geological investigations applied in the MIU project, focusing on the evaluation of their effectiveness to understand for deep underground geoenvironment. (author)

  8. How can new technology, improve façade construction of office building, in Iran

    OpenAIRE

    Saberi, Akbar

    2014-01-01

    It is evident that available technologies on office building sector in Shiraz relay on traditional construction especially on wet methods. Wet system process depends on human interpretation (The human interpretation is the basics of the systems) which cause major problems in construction quality. For this propose this dissertation focus on construction method in office building in Iran. Compared to wet construction, dry system is new technology in the construction industry. ...

  9. Underground characterisation and research facility ONKALO

    International Nuclear Information System (INIS)

    Ikonen, Antti; Ylae-Mella, Mia; Aeikaes, Timo

    2006-01-01

    Posiva's repository for geological disposal of the spent fuel from Finnish nuclear reactors will be constructed at Olkiluoto. The selection of Olkiluoto was made based on site selection research programme conducted between 1987-2001. The next step is to carry out complementary investigations of the site and apply for the construction license for the disposal facility. The license application will be submitted in 2012. To collect detailed information of the geological environment at planned disposal depth an underground characterisation and research facility will be built at the site. This facility, named as ONKALO, will comprise a spiral access tunnel and two vertical shafts. The excavation of ONKALO is in progress and planned depth (400 m) will be reached in 2009. During the course of the excavation Posiva will conduct site characterisation activities to assess the structure and other properties of the site geology. The aim is that construction will not compromise the favourable conditions of the planned disposal depth or introduce harmful effects in the surrounding bedrock which could jeopardize the long-term safety of the geological disposal. (author)

  10. The underground economy in Romania

    Directory of Open Access Journals (Sweden)

    Adriana Veronica LITRA

    2016-07-01

    Full Text Available The paper aims at covering issues related to the underground economy, activities that compound this phenomenon, its magnitude in Romania and reported to the European average. Underground economy in Romania consists of undeclared work (2/3 from the total and unreported income; it decreased from 33.6% of GDP in 2003 to 28% in 2014, but remained over EU-28 average with about 10 p.p. Among EU-28 countries, only Bulgaria exceeds the size of the underground economy of Romania. The underground economy is a challenge for the leadership of the state which must act simultaneously to stop illegal activities, and to discourage non-declaration of the legal activities. Corruption favours maintaining the underground economy, delays economic development, obstructs democratic processes and affects justice and the law state.

  11. Locating underground uranium deposits

    International Nuclear Information System (INIS)

    Felice, P.E.

    1979-01-01

    Underground uranium deposits are located by placing wires of dosimeters each about 5 to 18 mg/cm 2 thick underground in a grid pattern. Each dosimeter contains a phosphor which is capable of storing the energy of alpha particles. In each pair one dosimeter is shielded from alpha particles with more than 18 mg/cm 2 thick opaque material but not gamma and beta rays and the other dosimeter is shielded with less than 1 mg/cm 2 thick opaque material to exclude dust. After a period underground the dosimeters are heated which releases the stored energy as light. The amount of light produced from the heavily shielded dosimeter is subtracted from the amount of light produced from the thinly shielded dosimeter to give an indication of the location and quantity of uranium underground

  12. Three-dimensional time-lapse velocity tomography of an underground longwall panel

    Energy Technology Data Exchange (ETDEWEB)

    Luxbacher, K.; Westman, E.; Swanson, P.; Karfakis, M. [Virginia Tech., Blacksburg, VA (United States). Dept. of Mining & Minerals Engineering

    2008-06-15

    Three-dimensional velocity tomograms were generated to image the stress redistribution around an underground coal longwall panel to produce a better understanding of the mechanisms that lead to ground failure, especially rockbursts. Mining-induced microseismic events provided passive sources for the three-dimensional velocity tomography. Surface-mounted geophones monitored microseismic activity for 18 days. Eighteen tomograms were generated and high-velocity regions correlated with high abutment stresses predicted by numerical modeling. Additionally, the high-velocity regions were observed to redistribute as the longwall face retreated, indicating that velocity tomography may be an appropriate technology for monitoring stress redistribution in underground mines.

  13. Digital Technology for Construction Period Reduction of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    You, Y. M. [PHILOSOPHIA, Inc., Seoul (Korea, Republic of); Suh, K. Y. [Seoul National Univ., Seoul (Korea, Republic of)

    2009-10-15

    PHILOSOPHIA, Inc. and Seoul National University have jointly developed a first-of-a-kind engineering (FOAKE) solution. The solution lends itself to the four-plus-dimensional (4{sup +}D) Technology{sup TM} resorting to three -dimensional (3D) computer-aided design (CAD) digital mockup (DMU). The aim is to minimize the working hours via process optimization by real-time exchange of design and process information in the ubiquitous system. The 4{sup +}D Technology{sup TM} in the 3D virtual reality (VR) space and time plus cost coordinates, is developed to reduce the construction time as well as cost of nuclear power plants (NPPs) by optimizing the manufacturing procedure and construction process. The 4{sup +}D Technology{sup TM} anchored to the 3D CAD DMU allows the interference of the NPP components to be checked upon early in the design stage, and the process sequences to be optimized. Moreover, its ergonomic and robotic technologies enable simulation of all the aspects of the workers, robots and machines involved in the construction process. One of the greatest advantages of the 4{sup +}D Technology{sup TM} lies in that any change of the overall process procedures can virtually be tested. On the other hand, it shall financially be unbearable to alter the procedures consisting of plenty of structures and components, complicated detailed processes and long work hours in the physical space.

  14. Digital Technology for Construction Period Reduction of Nuclear Power Plants

    International Nuclear Information System (INIS)

    You, Y. M.; Suh, K. Y.

    2009-01-01

    PHILOSOPHIA, Inc. and Seoul National University have jointly developed a first-of-a-kind engineering (FOAKE) solution. The solution lends itself to the four-plus-dimensional (4 + D) Technology TM resorting to three -dimensional (3D) computer-aided design (CAD) digital mockup (DMU). The aim is to minimize the working hours via process optimization by real-time exchange of design and process information in the ubiquitous system. The 4 + D Technology TM in the 3D virtual reality (VR) space and time plus cost coordinates, is developed to reduce the construction time as well as cost of nuclear power plants (NPPs) by optimizing the manufacturing procedure and construction process. The 4 + D Technology TM anchored to the 3D CAD DMU allows the interference of the NPP components to be checked upon early in the design stage, and the process sequences to be optimized. Moreover, its ergonomic and robotic technologies enable simulation of all the aspects of the workers, robots and machines involved in the construction process. One of the greatest advantages of the 4 + D Technology TM lies in that any change of the overall process procedures can virtually be tested. On the other hand, it shall financially be unbearable to alter the procedures consisting of plenty of structures and components, complicated detailed processes and long work hours in the physical space

  15. Challenges to and proposals for underground gas storage (UGS business in China

    Directory of Open Access Journals (Sweden)

    Gangxiong Zhang

    2017-05-01

    Full Text Available Underground gas storage (UGS is one of the major storage and peak-shaving means in the world among numerous storage ways via gas fields, small-scale LNG, etc. With the rapid development of natural gas industry in China, the seasonal peak-shaving issues are increasingly prominent, so how to achieve sustainable development of UGS business has become a major problem at present. In view of this, we studied the present status and trend of UGS development abroad and analyzed the following challenges encountered by UGS in China. (1 UGS construction falls behind the world and peak-shaving capacity is insufficient. (2 There is lack of quality gas sources for storage and the complicated geological conditions make the cost of UGS construction high. (3 UGS construction is still at the preliminary stage, so experience is not enough in safety and scientific operation and management. (4 UGS construction, management and operation are not unified as a whole, so its maximum efficiency fails to be exerted. (5 The economic benefit of UGS is difficult to be shown without independent cost accounting. Based on the experience of other countries, some proposals were put forward on UGS development under the actual present situation: to strengthen strategic UGS layout, intensify storage site screening in key areas and steadily promote UGS construction; to establish professional UGS technical and management teams and intensify the research of key technologies; and to set up a complete and rationally-distributed UGS construction, operation and management system.

  16. Characterization of the seismic environment at the Sanford Underground Laboratory, South Dakota

    Energy Technology Data Exchange (ETDEWEB)

    Harms, J; Dorsher, S; Kandhasamy, S; Mandic, V [University of Minnesota, 116 Church Street SE, Minneapolis, MN 55455 (United States); Acernese, F; Barone, F [Universita degli Studi di Salerno, Fisciano (Saudi Arabia) (Italy); Bartos, I; Marka, S [Columbia University, New York, NY 10027 (United States); Beker, M; Van den Brand, J F J; Rabeling, D S [Nikhef, National Institute for Subatomic Physics, Science Park 105, 1098 XG Amsterdam (Netherlands); Christensen, N; Coughlin, M [Carleton College, Northfield, MN 55057 (United States); DeSalvo, R [California Institute of Technology, Pasadena, CA 91125 (United States); Heise, J; Trancynger, T [Sanford Underground Laboratory, 630 East Summit Street, Lead, SD 57754 (United States); Mueller, G [University of Florida, Gainesville, FL 32611 (United States); Naticchioni, L [Department of Physics, University of Rome ' Sapienza' , P.le Aldo Moro 2, 00185 Rome (Italy); O' Keefe, T [Saint Louis University, 3450 Lindell Blvd., St. Louis, MO 63103 (United States); Sajeva, A, E-mail: janosch@caltech.ed [Dipartimento di Fisica ' Enrico Fermi' , Universita di Pisa, Largo Bruno Pontecorvo, Pisa (Italy)

    2010-11-21

    An array of seismometers is being developed at the Sanford Underground Laboratory, the former Homestake mine, in South Dakota to study the properties of underground seismic fields and Newtonian noise, and to investigate the possible advantages of constructing a third-generation gravitational-wave detector underground. Seismic data were analyzed to characterize seismic noise and disturbances. External databases were used to identify sources of seismic waves: ocean-wave data to identify sources of oceanic microseisms and surface wind-speed data to investigate correlations with seismic motion as a function of depth. In addition, sources of events contributing to the spectrum at higher frequencies are characterized by studying the variation of event rates over the course of a day. Long-term observations of spectral variations provide further insight into the nature of seismic sources. Seismic spectra at three different depths are compared, establishing the 4100 ft level as a world-class low seismic-noise environment.

  17. Stability Evaluation on Surrounding Rocks of Underground Powerhouse Based on Microseismic Monitoring

    Directory of Open Access Journals (Sweden)

    Feng Dai

    2015-01-01

    Full Text Available To study the stability of underground powerhouse at Houziyan hydropower station during excavation, a microseismic monitoring system is adopted. Based on the space-time distribution characteristics of microseismic events during excavation of the main powerhouse, the correlation between microseismic events and blasting construction is established; and the microseismic clustering areas of the underground powerhouse are identified and delineated. The FLAC3D code is used to simulate the deformation of main powerhouse. The simulated deformation characteristics are consistent with that recorded by microseismic monitoring. Finally, the correlation between the macroscopic deformation of surrounding rock mass and microseismic activities is also revealed. The results show that multiple faults between 1# and 3# bus tunnels are activated during excavation of floors V and VI of the main powerhouse. The comprehensive method combining microseismic monitoring with numerical simulation as well as routine monitoring can provide an effective way to evaluate the surrounding rock mass stability of underground caverns.

  18. Underground storage tank soft waste dislodging and conveyance

    International Nuclear Information System (INIS)

    Wellner, A.F.S.

    1993-01-01

    The primary objective of this task is to demonstrate potential technical solutions and to acquire engineering data and information on the retrieval technologies applicable for use in retrieving waste from underground storage tanks. This task focuses on soft waste dislodging and conveyance technologies that would be used in conjunction with a manipulator-based retrieval system. This retrieval task focuses on Hanford single-shell tanks, but the results may also have applications to other waste retrieval problems. This work is part of the U.S. Department of Energy's (DOE's) Office of Technology Development, sponsored by the DOE's Richland Operations Office under the Underground Storage Tanks Integrated Demonstration (USTID) program. This task is one element of the whole waste dislodging and conveyance system in the USTID. The tank wastes contain both hazardous and radioactive constituents. This task focuses on the processes for dislodging and retrieving soft wastes, mainly sludge. Sludge consists primarily of heavy-metal, iron, and aluminum precipitates. Sludges vary greatly in their physical properties and may contain pockets of liquid. Sludges have been described as varying in consistency from thick slurry to sticky clay and as sandy with hard chunks of material. The waste is believed to have adhesive and cohesive properties. The quantitative physical properties of the wastes have yet to be measured. The waste simulants used in the testing program emulate the physical properties of the tank waste

  19. Construction of semi-underground type power plant in close vicinity of existing structures. Kisetsu kozobutsu ni kinsetsu shita han chika shiki hatsudensho no seko

    Energy Technology Data Exchange (ETDEWEB)

    Saito, K [Toshiba Ceramics Co. Ltd., Tokyo (Japan); Suda, H [Nippon Koei CO. Ltd., Tokyo (Japan); Kanazawa, S [Hazama-Gumi Ltd., Tokyo (Japan)

    1991-01-30

    The second Akashiba power station is of a semi-underground type and located on a steep slope between the Arakawa River and a national road. Therefore, there were many such problems to be solved for its construction as safety precaution for steep slope ground including the closely located national road, underwater work for the intake and outlet works, construction of tunnel below the present water level of the river in which deluges can be expected. Very severe conditions were imposed for the plan of the retaining walls, which are required for the prevention of landslide on the national road side, because of the problems of boundaries of the site, proprietary right, etc. The plan and design were studied for 3 cases, i.e. during drilling, at regular time and at the time of earthquake occurrence. Outlines of the drilling of the power plant shaft, mucking, timbering, spraying and spring water treatment are given. In connection with the control of measurement, subjects for measurement and the result of measurement are reported. Although this construction work was carried out under very severe conditions, it was completed in August, 1990 with no serious disaster. 13 figs., 5 tabs.

  20. Progress of the Felsenkeller Shallow-Underground Accelerator for Nuclear Astrophysics

    Science.gov (United States)

    Bemmerer, D.; Cavanna, F.; Cowan, T. E.; Grieger, M.; Hensel, T.; Junghans, A. R.; Ludwig, F.; Müller, S. E.; Rimarzig, B.; Reinicke, S.; Schulz, S.; Schwengner, R.; Stöckel, K.; Szücs, T.; Takács, M. P.; Wagner, A.; Wagner, L.; Zuber, K.

    Low-background experiments with stable ion beams are an important tool for putting the model of stellar hydrogen, helium, and carbon burning on a solid experimental foundation. The pioneering work in this regard has been done by the LUNA collaboration at Gran Sasso, using a 0.4 MV accelerator. In the present contribution, the status of the project for a higher-energy underground accelerator is reviewed. Two tunnels of the Felsenkeller underground site in Dresden, Germany, are currently being refurbished for the installation of a 5 MV high-current Pelletron accelerator. Construction work is on schedule and expected to complete in August 2017. The accelerator will provide intense, 50 µA, beams of 1H+, 4He+, and 12C+ ions, enabling research on astrophysically relevant nuclear reactions with unprecedented sensitivity.

  1. Seepage into an Underground Opening Constructed in Unsaturated Fractured Rock Under Evaporative Conditions, RPR 29013(C)

    International Nuclear Information System (INIS)

    Trautz, R. C.; Wang, Joseph S. Y.

    2001-01-01

    Liquid-release tests, performed in boreholes above an underground opening constructed in unsaturated fractured rock, are used in this study to evaluate seepage into a waste emplacement drift. Evidence for the existence of a capillary barrier at the ceiling of the drift is presented, based on field observations (including spreading of the wetting front across the ceiling and water movement up fractures exposed in the ceiling before seepage begins). The capillary barrier mechanism has the potential to divert water around the opening, resulting in no seepage when the percolation flux is at or below the seepage threshold flux. Liquid-release tests are used to demonstrate that a seepage threshold exists and to measure the magnitude of the seepage threshold flux for three test zones that seeped. The seepage data are interpreted using analytical techniques to estimate the test-specific strength of the rock capillary forces (α -1 ) that prevent water from seeping into the drift. Evaporation increases the seepage threshold flux making it more difficult for water to seep into the drift and producing artificially inflated α -1 values. With adjustments for evaporation, the minimum test-specific threshold is 1,600 mm/yr with a corresponding α -1 of 0.027 m

  2. Underground water stress release models

    Science.gov (United States)

    Li, Yong; Dang, Shenjun; Lü, Shaochuan

    2011-08-01

    The accumulation of tectonic stress may cause earthquakes at some epochs. However, in most cases, it leads to crustal deformations. Underground water level is a sensitive indication of the crustal deformations. We incorporate the information of the underground water level into the stress release models (SRM), and obtain the underground water stress release model (USRM). We apply USRM to the earthquakes occurred at Tangshan region. The analysis shows that the underground water stress release model outperforms both Poisson model and stress release model. Monte Carlo simulation shows that the simulated seismicity by USRM is very close to the real seismicity.

  3. Use of cost-effective construction technologies in India to mitigate climate change

    Energy Technology Data Exchange (ETDEWEB)

    Sengupta, N. [Forum of Scientists, Engineers and Technologists, Kolkata (India)

    2008-01-10

    Concentration of greenhouse gases plays a major role in raising the earth's temperature. Carbon dioxide, produced from burning of fossil fuels, is the principle greenhouse gas and efforts are being made at international level to reduce its emission through adoption of energy-efficient technologies. The UN Conference on Environment and Development, 1992 made a significant development in this field by initiating the discussion on sustainable development under the Agenda 21. Cost-effective construction technologies can bring down the embodied energy level associated with production of building materials by lowering use of energy-consuming materials. This embodied energy is a crucial factor for sustainable construction practices and effective reduction of the same would contribute in mitigating global warming. The cost-effective construction technologies would emerge as the most acceptable case of sustainable technologies in India both in terms of cost and environment.

  4. The concept of underground nuclear heat and power plants (UNHPP) of upgraded safety, developed on the basis of ship-building technologies

    International Nuclear Information System (INIS)

    Pashin, V.M.; Petrov, Eh.L.; Shalik, G.P.; Khazov, B.S.; Malyshev, S.P.

    1996-01-01

    A concept of underground nuclear heat and power plants (UNHPP) of upgraded safety on the basis of ship-building technologies is considered, in which the priority is set to population security and environmental protection. Ways of realization of ziro radiation risk for the population residing in a close vicinity of UNHPP are substantiated. basic principles of the concept are formulated which envisage the use of ship propulsion reactor facilities that have been multiply tested in operation. The sources of economic competitiveness of UNHPPs, as compared with the existing NPPs, are shown

  5. Adoption of innovative production technologies in the road construction industry

    NARCIS (Netherlands)

    Habets, M.J.M.; van der Sijde, Peter; Voordijk, Johannes T.

    2007-01-01

    New procurement methods encourage the adoption of innovative production technologies. This triggers the need for entrepreneurship in the construction industry. The purpose of this study is to provide insights into the adoption processes of a particular set of new production technologies in the Dutch

  6. Using of science technologies for mining machinery constructions' strength improvement

    Science.gov (United States)

    Yurchenko, E. V.; Mehtiev, A. D.; Yugai, V. V.; Bulatbayev, F. N.

    2015-04-01

    Recommendations for strengthening the brake construction in accident dangerous areas of fatigue destruction were developed. Computer modeling was made using the ANSYS program that helps to visualize stained condition of the construction for further practical testing of the strength and reliability improving technology of mining elevating machines' constructions, which are being in a long-term use, with a help of the strengthening elements. A way of construction strengthening, which eliminates the possibility of further fatigue destruction of the brake system elements, because of the load cycle in exploitation process.

  7. CITEQ creates a transformer for underground electric networks: a joint initiative by Hydro-Quebec and ABB

    International Nuclear Information System (INIS)

    Cordeau, P.

    1997-01-01

    Advances in technology regarding underground transformers was discussed. After more than 3 years of research, CITEQ (Centre d'innovation sur le transport d'energie du Quebec), a new company founded by Hydro-Quebec and ABB, is on the verge of a breakthrough with a new submersible transformer with solid insulation. This transformer was specially designed for use in underground electric networks. The new transformer is a good alternative to conventional oil transformers which have a high risk of pollution mainly due to corrosion, leaks, explosions or fires. Also, the outer shell of the new transformer is composed of composite material which will eliminate the need for maintenance. The service life of the new transformer is expected to be approximately 30 to 40 years. CITEQ is hoping that this new technology will benefit the residential sector which is powered by underground distribution networks. 1 fig

  8. Office building with an underground storage system. Operational experiences after one year; Buerogebaeude mit Erdspeicher. Betriebserfahrungen nach einem Jahr

    Energy Technology Data Exchange (ETDEWEB)

    Braun, Dorothee; Wehrli, Stefan [Basler und Hofmann AG, Zuerich (Switzerland)

    2011-07-01

    Self-sufficient heating and cooling - that was the principle of Basler paragraph Hofmann AG (Zuerich, Switzerland) and Stuecheli Architects (Zuerich, Switzerland) in the planning and constructing of a new office building in the Canton of Zuerich. For the first time an underground storage system was implemented in a commercial building. This underground storage refuels the solar energy in summer and supplies heating energy in winter. The office building was settled in in September, 2010. The pioneering project now delivers first empirical values with the underground storage system. These empirical values show: The concept comes up, but needs time.

  9. Underground storage tanks soft waste dislodging and conveyance

    International Nuclear Information System (INIS)

    Wellner, A.F.

    1993-10-01

    Currently 140 million liters (37 million gallons) of waste are stored in the single shell underground storage tanks (SSTs) at Hanford. The wastes contain both hazardous and radioactive constituents. This paper focuses on the Westinghouse Hanford Company's testing program for soft waste dislodging and conveyance technology. This program was initialized to investigate methods of dislodging and conveying soft waste. The main focus was on using air jets, water jets, and/or mechanical blades to dislodge the waste and air conveyance to convey the dislodged waste. These waste dislodging and conveyance technologies would be used in conjunction with a manipulator based retrieval system

  10. The Mizunami underground research laboratory in Japan - programme for study of the deep geological environment

    International Nuclear Information System (INIS)

    Sakuma, Hideki; Sugihara, Kozo; Koide, Kaoru; Mikake, Shinichiro

    1998-01-01

    This paper is an overview of the PNC's Mizunami Underground Research Laboratory project in Mizunami City, central Japan. The Mizunami Underground Research Laboratory now will succeed the Kamaishi Mine as the main facility for the geoscientific study of the crystalline environment. The site will never be considered as a site for a repository. The surface-based investigations, planned to continue for some 5 years commenced in the autumn 1997. The construction of the facility to the depth of 1000 m is currently planned to: Develop comprehensive investigation techniques for geological environment; Acquire data on the deep geological environment and to; Develop a range of engineering techniques for deep underground application. Besides PNC research, the facility will also be used to promote deeper understanding of earthquakes, to perform experiments under micro-gravity conditions etc. The geology of the site is shortly as follows: The sedimentary overburden some 20 - 100 m in thickness is of age 2 - 20 million years. The basement granite is approx. 70 million years. A reverse fault is crosscutting the site. The identified fault offers interesting possibilities for important research. Part of the work during the surface-based investigations, is to drill and test deep boreholes to a planned depth up to 2000 m. Based on the investigations, predictions will be made what geological environment will be encountered during the Construction Phase. Also the effect of construction will be predicted. Methodology for evaluation of predictions will be established

  11. Evaluating the costs and achievable benefits of extending technologies for uneconomical coal resources in South Africa: the case of underground coal gasification

    CSIR Research Space (South Africa)

    Zieleniewski, M

    2008-11-01

    Full Text Available -3433. Shoko, E., McLellan, B., Dicks, A.L., Diniz da Costa, J.C., 2006. Hydrogen from coal: Production and utilisation technologies. International Journal of Coal Geology, 65(3-4): 213-222. Simeons, C., 1978. Coal: Its role in tomorrow’s technol- ogy... the consideration of other, alternative solutions to the energy shortage problem. Underground coal gasifi- cation (UCG) is among the most promising tech- nologies and, to an acceptable degree, the proven feasible one (Walker et al., 2001; Ergo Exergy, 2005...

  12. Application of virtual reality technology to activities for offering information to the general public in the Mizunami Underground Research Laboratory Project

    International Nuclear Information System (INIS)

    Saito, Hiroshi; Kawase, Keiichi; Sugihara, Kozo; Yamamoto, Junta

    2000-01-01

    The Tono Geoscience Center is carrying out the Mizunami Underground Research Laboratory Project (MIU Project), as part of its scientific research program, in Mizunami City, Gifu Prefecture. We believe that the public and especially the local residents should have a precise understanding of the MIU project. Therefore, to provide information we have used virtual reality (VR) technology in the project since 1996. Software to introduce both the MIU Project and the geology of the Tono district has been completed. The Tono district is characterized by uranium ore deposits, and by clay deposits which are used by the pottery industry. Software with some amusement value, such as hot spring drilling, has also been completed. We plan further software development of VR technology to increase the feeling of realism. (author)

  13. Communications construction on mining grounds influenced by mining damage. Budownictwo komunikacyjne na terenach objetych szkodami gorniczymi

    Energy Technology Data Exchange (ETDEWEB)

    Rosikon, A

    1979-01-01

    This book considers problems associated with construction of communication lines on grounds influenced by underground coal mining. It is stated that about 50% of coal mined in Poland comes from protective coal pillars. Improving methods of strata control and ground control after underground mining will influence perspectives of mining in protective pillars. The following problems associated with minimizing mining damage are analyzed: types of ground deformation caused by underground mining, continuous and discontinuous deformation, factors which influence formation of subsidence troughs, forecasting ground subsidence according to the Knothe and Budryk theory, horizontal and vertical ground dislocation, coefficients used for description of ground deformation, Kochmanski's theory of continuous deformation, effects of ground subsidence of foundations of buildings and industrial structures, construction of roads, railway tracks and other communication lines on ground influenced by discontinuous deformations caused by coal mining, problems associated with construction of bridges and tunnels, construction of sewage systems, effects of underground mining on maintenance and repair of communication lines and sewage systems. Ways of minimizing discontinuous ground deformation are analyzed.

  14. 30 CFR 75.804 - Underground high-voltage cables.

    Science.gov (United States)

    2010-07-01

    ... AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Underground High-Voltage Distribution § 75.804 Underground high-voltage cables. (a) Underground high-voltage cables used in resistance... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground high-voltage cables. 75.804 Section...

  15. 'Concrete shell formwork' technology applied to the construction of the Paks Nuclear Power Plant

    International Nuclear Information System (INIS)

    Fejes, A.

    1982-01-01

    The conventional formworking technology could not meet the unusual requirements needed in constructing the concrete walls of the nuclear power plant building. A new concrete shell formworking developed in the Soviet Union has been adapted to meet the criteria. Prefabricated concrete shells are mounted separately during construction on separated parts of the reinforcing structure. The steps of the construction process are described with the economic evaluation of this new construction technology. (R.P.)

  16. Study on dynamic behavior of a shaft excavation through a faulted crystalline rock mass

    International Nuclear Information System (INIS)

    Hashizume, Shigeru; Matsui, Hiroya; Horiuchi, Yasuharu; Hata, Koji; Akiyoshi, Kenji; Sato, Shin; Shibata, Chihoko; Niunoya, Sumio; Noda, Masaru

    2013-01-01

    The 'Mizunami Underground Research Laboratory' has been studying and developing engineering technology for deep underground applications. These applications are multifaceted and are categorized as development of design and construction planning technology, development construction technology, development of countermeasure technology, and development of technology for construction and operation security. In this report, the dynamic behavior of shaft and the surrounding rock mass has been studied with respect to rock mass displacement and stress, the effect of using a concrete liner and excavating through faulted crystalline rock. (author)

  17. Development of decommissioning technologies in Sumitomo Mitsui Construction Co., Ltd

    International Nuclear Information System (INIS)

    Maruyama, Shinichiro; Suzuki, Toru; Ogane, Daisuke

    2011-01-01

    The decommissioning program of nuclear reactors in Japan first started in December 2001 on the Japan's first commercial nuclear power station Tokai Power Plant. In February 2008, the decommissioning of 'Fugen' was first approved as the program on a large-scale water reactor in Japan, and was started. From now on, decommissioning programs of LWRs constructed in the early stage of nuclear development will gradually increase. Decommissioning projects are required more than 20 years for completing the entire processes, because of its characteristics to placing the utmost priority to safety. Diverse types of element technologies are fully utilized in decommissioning projects, such as technology of evaluating remaining radioactivity, decontamination, dismantling/remote control, and treatment/disposal/recycling. Also there are a lot of civil engineering or building technologies and its applied technologies in these element technologies. Sumitomo Mitsui Construction Co., Ltd. has been committed to contributing to the promotion of decommissioning projects in Japan, and has carried out investigation/evaluation of applicability of the existing dismantling technologies to dismantling of reactors, seismic evaluation of the buildings for dismantling the reactor zone, development of recycling of concrete, and discussion of rational waste treatment/disposal methods. In this thesis, we present our decommissioning technologies focusing on the element technologies that our company has investigated and developed so far. (author)

  18. VRLane: a desktop virtual safety management program for underground coal mine

    Science.gov (United States)

    Li, Mei; Chen, Jingzhu; Xiong, Wei; Zhang, Pengpeng; Wu, Daozheng

    2008-10-01

    VR technologies, which generate immersive, interactive, and three-dimensional (3D) environments, are seldom applied to coal mine safety work management. In this paper, a new method that combined the VR technologies with underground mine safety management system was explored. A desktop virtual safety management program for underground coal mine, called VRLane, was developed. The paper mainly concerned about the current research advance in VR, system design, key techniques and system application. Two important techniques were introduced in the paper. Firstly, an algorithm was designed and implemented, with which the 3D laneway models and equipment models can be built on the basis of the latest mine 2D drawings automatically, whereas common VR programs established 3D environment by using 3DS Max or the other 3D modeling software packages with which laneway models were built manually and laboriously. Secondly, VRLane realized system integration with underground industrial automation. VRLane not only described a realistic 3D laneway environment, but also described the status of the coal mining, with functions of displaying the run states and related parameters of equipment, per-alarming the abnormal mining events, and animating mine cars, mine workers, or long-wall shearers. The system, with advantages of cheap, dynamic, easy to maintenance, provided a useful tool for safety production management in coal mine.

  19. 30 CFR 57.8531 - Construction and maintenance of ventilation doors.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Construction and maintenance of ventilation... NONMETAL MINES Ventilation Underground Only § 57.8531 Construction and maintenance of ventilation doors... constructed of wood; (c) Maintained in good condition; (d) Self-closing, if manually operated; and (e...

  20. FY 2000 report on the results of the advanced R and D for the UTES (underground thermal energy storage) system; 2000 nendo chichu jiban chikunetsu system gijutsu sendo kenkyu kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In this study, study was made of the commercialization of the UTES (underground thermal energy storage) system using the underground heat source heat pump system technology as the base, considering that this is a technology suitable for the urban area where the heat demand intensively increases and a lot of exhaust heat and usable heat exist. By the realization of the UTES system technology, it is expected that the system promotes Japan's utilization of the unused energy and contributes to the construction of the CO2 emission control type society for Japan's energy policy and global warming prevention and secondarily to leveling of power loads and elimination of the heat island phenomenon in large cities. As to the UTES system which is aimed at being used for space heating and cooling and hot water supply in buildings, the following two were studied: the indirect system, BTES (borehole thermal energy storage) system, in which heat is collected/radiated from the ground by the heat exchanger installed underground; the direct system, ATES (aquifer thermal energy storage) system, in which the groundwater stored in aquifer is directly pumped up and used. The study was made in the items written below: 1) establishment of an system image of the UTES system; 2) evaluation study of effects of the introduction, practical applicability, etc. 3) extraction of the subjects for development. As a result, system images of the indirect/direct systems were obtained. (NEDO)

  1. FY 2000 report on the results of the advanced R and D for the UTES (underground thermal energy storage) system; 2000 nendo chichu jiban chikunetsu system gijutsu sendo kenkyu kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In this study, study was made of the commercialization of the UTES (underground thermal energy storage) system using the underground heat source heat pump system technology as the base, considering that this is a technology suitable for the urban area where the heat demand intensively increases and a lot of exhaust heat and usable heat exist. By the realization of the UTES system technology, it is expected that the system promotes Japan's utilization of the unused energy and contributes to the construction of the CO2 emission control type society for Japan's energy policy and global warming prevention and secondarily to leveling of power loads and elimination of the heat island phenomenon in large cities. As to the UTES system which is aimed at being used for space heating and cooling and hot water supply in buildings, the following two were studied: the indirect system, BTES (borehole thermal energy storage) system, in which heat is collected/radiated from the ground by the heat exchanger installed underground; the direct system, ATES (aquifer thermal energy storage) system, in which the groundwater stored in aquifer is directly pumped up and used. The study was made in the items written below: 1) establishment of an system image of the UTES system; 2) evaluation study of effects of the introduction, practical applicability, etc. 3) extraction of the subjects for development. As a result, system images of the indirect/direct systems were obtained. (NEDO)

  2. Detection test of wireless network signal strength and GPS positioning signal in underground pipeline

    Science.gov (United States)

    Li, Li; Zhang, Yunwei; Chen, Ling

    2018-03-01

    In order to solve the problem of selecting positioning technology for inspection robot in underground pipeline environment, the wireless network signal strength and GPS positioning signal testing are carried out in the actual underground pipeline environment. Firstly, the strength variation of the 3G wireless network signal and Wi-Fi wireless signal provided by China Telecom and China Unicom ground base stations are tested, and the attenuation law of these wireless signals along the pipeline is analyzed quantitatively and described. Then, the receiving data of the GPS satellite signal in the pipeline are tested, and the attenuation of GPS satellite signal under underground pipeline is analyzed. The testing results may be reference for other related research which need to consider positioning in pipeline.

  3. Fire extinguishing system in large underground garages

    Directory of Open Access Journals (Sweden)

    Ivan Antonov

    2017-04-01

    Full Text Available In the work is considered an acceptable constructive scheme from a practical point of view at fire extinguishing in underground garages. The garage space is divided into quadrants which covering, for example, 2 cars. In case of ignition on one of them, a sprinkler nozzle system is triggered by the effect of the vertical convective jet. A protective curtain preventing the spread of fire to adjacent vehicles is realized. The solution is based on an integrated method which allows the calculation from hydrodynamic point of view on extinguishing time of the fire extinguishing system.

  4. DEVELOPMENT OF THE UNDERGROUND SPACE OF CITIES IN TERMS OF THEIR SUSTAINABLE DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Belyaev Valeriy L’vovich

    2014-02-01

    Full Text Available The article shows that the negative trends in the cities development, especially their territorial "sprawling" contributes to the onset of the global environmental crisis. This call requires setting the city planners mind on noosphere thinking and establishing an adequate system of spatial development of the cities. The formation of compact city models "new urbanism", "smart development" can be considered a progressive response and a world trend. It fully meets the course of integrated urban development of the underground space.In order to overcome the significant gap on this issue between Russia and many foreign countries the urban policy needs to be updated (disclosure of the fundamental principle of sustainable development, methodologies and tools of developing underground urbanity should be developed. The authors propose such a change of the underground space as an integrated spatial and geoenergy resource with the commitment to the strategic evaluation of its development during the entire life cycle of underground construction projects.The co-authors take into account the environmental effects of the proposed development under the direction of modern paradigms of the biosphere compatible, viable and growing cities, as well as the capacity to organize their own groups. As a base model, we take a city as a complex system of natural and man-caused, containing a fiber space where underground space and underground structures is one of the layers. The instrument for this approach implementation may be a biotechnospherical humanitarian balance of the city, including the parameters of underground layers. In addition, the calculations of the information flow (Entropy between the layers is of great importance. The sustainable development of the city is dominated by a stream of negative entropy.On this basis, for the conditions of Moscow the device tools "physical planning" should be used in respect of the characteristics of underground space

  5. Potential and challenges of VLC based IPS in underground mines

    OpenAIRE

    Seguel, Fabián; Soto, Ismael; ADASME, Pablo; Krommenacker, Nicolas; Charpentier, Patrick

    2017-01-01

    International audience; Chile is the largest copper producer in the world. In the world, almost 40% of copper is produced underground and it is expected that the activity will reach the 60% of the total mining activity. Because of this, there will be new challenges in terms of safety and productivity. Visible Light Communications (VLC) is a new technology capable to provide illumination and communication at the same time. This technology has shown high accuracy in localization and tacking for...

  6. MODERN TRENDS IN THE DEVELOPMENT OF THE TECHNOLOGIES FOR PRODUCTION OF DENTAL CONSTRUCTIONS.

    Directory of Open Access Journals (Sweden)

    Tsanka Dikova

    2015-12-01

    Full Text Available The aim of the present paper is to make a review of the modern trends in the development of the technologies for production of dental constructions. Three are the main trends in production technologies in dentistry last 30 years: digitalization, simulation and implementation of additive technologies. The simulation occurred first and due to the computers development it underwent fast progress from the mathematical calculations and analytical analysis to the 3D modeling and visualization. Thus Computer Aided Engineering (CAE was developed, allowing dental constructions with optimal design to be produced by optimal technological regimes. The first Computer Aided Design (CAD – Computer Aided Manufacturing (CAM systems were created in 1970s as a result of the digitalization. In this mode of operation at first virtual 3D model is generated by CAD, which then is used for production of the real construction by CAM. The CAD-CAM systems allow fabrication of dental restorations which is difficult or impossible to be manufactured by conventional technologies. The development of CAD unit runs from indirect scanning of the plaster model for obtaining data for the 3D model to direct scanning of the prosthesis area. While the development of CAM unit leads to direct manufacturing of the real dental construction using subtractive or additive technologies. The future development of the CAD-CAM systems as a whole characterizes with transition from closed to open access systems, which make them more flexible. In the late 1980sthe new approach to the production of constructions appeared – by addition of material layer by layer. The additive technologies were developed. They characterize with building of one layer at a time from a powder or liquid that is bonded by means of melting, fusing or polymerization. Stereo lithography, fused deposition modeling, selective electron beam melting, laser powder forming and inkjet printing are the methods, mostly used in

  7. Study on Construction Technology of Municipal Road and Bridge Concrete

    Science.gov (United States)

    Tang, Fuyong

    2018-03-01

    With the continuous development of social economy and the accelerating process of urbanization, municipal road and bridge projects have also shown a trend of rapid development. Municipal road and bridge work can fully reflect the economic and cultural development level of cities and is also an important symbol of urban development. As a basic material of construction, concrete is widely used in engineering construction. This article will analyze the municipal road and bridge concrete construction technology, put forward corresponding measures.

  8. Study on smart city construction of Jiujiang based on IOT technology

    Science.gov (United States)

    Liu, Zeliang; Wang, Ying; Xu, Qin; Yan, Tao

    2017-06-01

    At present, with the technology of the Internet of things (IOT), building smart city is forming a powerful wave of city, which promotes economic and social development of city. This paper expounds the connotation of smart city, explores the social and economic significance of the construction of smart city, analyzes the present situation of smart city construction in Jiujiang, studies the basic principles development altar get and key construction projects, and puts forward relevant of Jiujiang smart city construction, and puts forward relevant proposals about smart construction in Jiujiang, Jiangxi.

  9. An Effective Belt Conveyor for Underground Ore Transportation Systems

    Science.gov (United States)

    Krol, Robert; Kawalec, Witold; Gladysiewicz, Lech

    2017-12-01

    Raw material transportation generates a substantial share of costs in the mining industry. Mining companies are therefore determined to improve the effectiveness of their transportation system, focusing on solutions that increase both its energy efficiency and reliability while keeping maintenance costs low. In the underground copper ore operations in Poland’s KGHM mines vast and complex belt conveyor systems have been used for horizontal haulage of the run-of-mine ore from mining departments to shafts. Basing upon a long-time experience in the field of analysing, testing, designing and computing of belt conveyor equipment with regard to specific operational conditions, the improvements to the standard design of an underground belt conveyor for ore transportation have been proposed. As the key elements of a belt conveyor, the energy-efficient conveyor belt and optimised carrying idlers have been developed for the new generation of underground conveyors. The proposed solutions were tested individually on the specially constructed test stands in the laboratory and in the experimental belt conveyor that was built up with the use of prototype parts and commissioned for the regular ore haulage in a mining department in the KGHM underground mine “Lubin”. Its work was monitored and the recorded operational parameters (loadings, stresses and strains, energy dissipation, belt tracking) were compared with those previously collected on a reference (standard) conveyor. These in-situ measurements have proved that the proposed solutions will return with significant energy savings and lower maintenance costs. Calculations made on the basis of measurement results in the specialized belt conveyor designing software allow to estimate the possible savings if the modernized conveyors supersede the standard ones in a large belt conveying system.

  10. McArthur River underground exploration program: report of the joint Federal-Provincial panel on uranium mining developments in Northern Saskatchewan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-01-15

    A report of the joint federal-provincial panel on uranium mining developments in northern Saskatchewan, on the McArthur River underground exploration program. The proposal to construct the surface and underground facilities required for the exploration and delineation of the McArthur River ore body, and any necessary additional infrastructure has been examined and public hearings have been held. The panel recommends that the underground exploration program as described by Cameco in its Environmental Impact Statement, and as clarified in its written and oral responses to the panel, be allowed to proceed under the conditions described within the report.

  11. McArthur River underground exploration program: report of the joint Federal-Provincial panel on uranium mining developments in Northern Saskatchewan

    International Nuclear Information System (INIS)

    1993-01-01

    A report of the joint federal-provincial panel on uranium mining developments in northern Saskatchewan, on the McArthur River underground exploration program. The proposal to construct the surface and underground facilities required for the exploration and delineation of the McArthur River ore body, and any necessary additional infrastructure has been examined and public hearings have been held. The panel recommends that the underground exploration program as described by Cameco in its Environmental Impact Statement, and as clarified in its written and oral responses to the panel, be allowed to proceed under the conditions described within the report

  12. 3D seismic imaging of the subsurface for underground construction and drilling

    International Nuclear Information System (INIS)

    Juhlin, Christopher

    2014-01-01

    3D seismic imaging of underground structure has been carried out in various parts of the world for various purposes. Examples shown below were introduced in the presentation. - CO 2 storage in Ketzin, Germany; - Mine planning at the Millennium Uranium Deposit in Canada; - Planned Forsmark spent nuclear fuel repository in Sweden; - Exploring the Scandinavian Mountain Belt by Deep Drilling: the COSC drilling project in Sweden. The author explained that seismic methods provide the highest resolution images (5-10 m) of deeper (1-5 km) sub-surfaces in the sedimentary environment, but further improvement is required in crystalline rock environments, and the integration of geology, geophysics, and drilling will provide an optimal interpretation. (author)

  13. The strengthening and repair of underground structures: A new approach to the management of nuclear waste

    International Nuclear Information System (INIS)

    Colgate, S.A.

    1991-01-01

    This paper presents three closely related ideas and technologies: (1) The secure, repairable, long time confinement of nuclear radioactive waste underground by a large surrounding region of compressive overstress; (2) The inherent tectonic weakness and vulnerability of the normal underground environment and its modification by overstress; (3) The process of creating overstress by the sequential periodic high pressure injection of a finite gel strength rapid setting grout. 12 refs., 6 figs

  14. The Global Experience of Deployment of Energy-Efficient Technologies in High-Rise Construction

    Science.gov (United States)

    Potienko, Natalia D.; Kuznetsova, Anna A.; Solyakova, Darya N.; Klyueva, Yulia E.

    2018-03-01

    The objective of this research is to examine issues related to the increasing importance of energy-efficient technologies in high-rise construction. The aim of the paper is to investigate modern approaches to building design that involve implementation of various energy-saving technologies in diverse climates and at different structural levels, including the levels of urban development, functionality, planning, construction and engineering. The research methodology is based on the comprehensive analysis of the advanced global expertise in the design and construction of energy-efficient high-rise buildings, with the examination of their positive and negative features. The research also defines the basic principles of energy-efficient architecture. Besides, it draws parallels between the climate characteristics of countries that lead in the field of energy-efficient high-rise construction, on the one hand, and the climate in Russia, on the other, which makes it possible to use the vast experience of many countries, wholly or partially. The paper also gives an analytical review of the results arrived at by implementing energy efficiency principles into high-rise architecture. The study findings determine the impact of energy-efficient technologies on high-rise architecture and planning solutions. In conclusion, the research states that, apart from aesthetic and compositional interpretation of architectural forms, an architect nowadays has to address the task of finding a synthesis between technological and architectural solutions, which requires knowledge of advanced technologies. The study findings reveal that the implementation of modern energy-efficient technologies into high-rise construction is of immediate interest and is sure to bring long-term benefits.

  15. The Beishan underground research laboratory for geological disposal of high-level radioactive waste in China: Planning, site selection, site characterization and in situ tests

    Directory of Open Access Journals (Sweden)

    Ju Wang

    2018-06-01

    Full Text Available With the rapid development of nuclear power in China, the disposal of high-level radioactive waste (HLW has become an important issue for nuclear safety and environmental protection. Deep geological disposal is internationally accepted as a feasible and safe way to dispose of HLW, and underground research laboratories (URLs play an important and multi-faceted role in the development of HLW repositories. This paper introduces the overall planning and the latest progress for China's URL. On the basis of the proposed strategy to build an area-specific URL in combination with a comprehensive evaluation of the site selection results obtained during the last 33 years, the Xinchang site in the Beishan area, located in Gansu Province of northwestern China, has been selected as the final site for China's first URL built in granite. In the process of characterizing the Xinchang URL site, a series of investigations, including borehole drilling, geological mapping, geophysical surveying, hydraulic testing and in situ stress measurements, has been conducted. The investigation results indicate that the geological, hydrogeological, engineering geological and geochemical conditions of the Xinchang site are very suitable for URL construction. Meanwhile, to validate and develop construction technologies for the Beishan URL, the Beishan exploration tunnel (BET, which is a 50-m-deep facility in the Jiujing sub-area, has been constructed and several in situ tests, such as drill-and-blast tests, characterization of the excavation damaged zone (EDZ, and long-term deformation monitoring of surrounding rocks, have been performed in the BET. The methodologies and technologies established in the BET will serve for URL construction. According to the achievements of the characterization of the URL site, a preliminary design of the URL with a maximum depth of 560 m is proposed and necessary in situ tests in the URL are planned. Keywords: Beishan, Xinchang site, Granite

  16. Simulation of Underground Muon Flux with Application to Muon Tomography

    Science.gov (United States)

    Yamaoka, J. A. K.; Bonneville, A.; Flygare, J.; Lintereur, A.; Kouzes, R.

    2015-12-01

    Muon tomography uses highly energetic muons, produced by cosmic rays interacting within the upper atmosphere, to image dense materials. Like x-rays, an image can be constructed from the negative of the absorbed (or scattered) muons. Unlike x-rays, these muons can penetrate thousands of meters of earth. Muon tomography has been shown to be useful across a wide range of applications (such as imaging of the interior of volcanoes and cargo containers). This work estimates the sensitivity of muon tomography for various underground applications. We use simulations to estimate the change in flux as well as the spatial resolution when imaging static objects, such as mine shafts, and dynamic objects, such as a CO2 reservoir filling over time. We present a framework where we import ground density data from other sources, such as wells, gravity and seismic data, to generate an expected muon flux distribution at specified underground locations. This information can further be fed into a detector simulation to estimate a final experimental sensitivity. There are many applications of this method. We explore its use to image underground nuclear test sites, both the deformation from the explosion as well as the supporting infrastructure (access tunnels and shafts). We also made estimates for imaging a CO2 sequestration site similar to Futuregen 2.0 in Illinois and for imaging magma chambers beneath the Cascade Range volcanoes. This work may also be useful to basic science, such as underground dark matter experiments, where increasing experimental sensitivity requires, amongst other factors, a precise knowledge of the muon background.

  17. Wireless device for activation of an underground shock wave absorber

    Science.gov (United States)

    Chikhradze, M.; Akhvlediani, I.; Bochorishvili, N.; Mataradze, E.

    2011-10-01

    The paper describes the mechanism and design of the wireless device for activation of energy absorber for localization of blast energy in underground openings. The statistics shows that the greatest share of accidents with fatal results associate with explosions in coal mines due to aero-methane and/or air-coal media explosion. The other significant problem is terrorist or accidental explosions in underground structures. At present there are different protective systems to reduce the blast energy. One of the main parts of protective Systems is blast Identification and Registration Module. The works conducted at G. Tsulukidze Mining Institute of Georgia enabled to construct the wireless system of explosion detection and mitigation of shock waves. The system is based on the constant control on overpressure. The experimental research continues to fulfill the system based on both threats, on the constant control on overpressure and flame parameters, especially in underground structures and coal mines. Reaching the threshold value of any of those parameters, the system immediately starts the activation. The absorber contains a pyrotechnic device ensuring the discharge of dispersed water. The operational parameters of wireless device and activation mechanisms of pyrotechnic element of shock wave absorber are discussed in the paper.

  18. Underground Storage Tanks in Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Underground storage tank (UST) sites which store petroleum in Iowa. Includes sites which have been reported to DNR, and have active or removed underground storage...

  19. Initial investment to 3D printing technologies in a construction company

    Directory of Open Access Journals (Sweden)

    Cernohorsky, Zdenek

    2017-06-01

    Full Text Available This article deals with an initial investment to 3D printing technologies in a construction company. The investment refers to the use of building information models and their integration with 3D printing technology within a construction company. In the first part, there will be discussed an introduction of 3D printing scheme in a construction company from a lifecycle perspective in general. As a part of this scheme, the ideal variant of an initial investment will be considered a.k.a a pilot project. In the second part, there will be a more detailed discussion of the pilot project, more about each activities which should be its parts and which should analyze cost categories. These categories will be about particular lifecycle stages of the pilot project. In the third part, a summary is done. This article could be a handout for a construction company in a term of an initial investment to 3D printing.

  20. Using game technologies to improve the safety of construction plant operations.

    Science.gov (United States)

    Guo, Hongling; Li, Heng; Chan, Greg; Skitmore, Martin

    2012-09-01

    Many accidents occur world-wide in the use of construction plant and equipment, and safety training is considered by many to be one of the best approaches to their prevention. However, current safety training methods/tools are unable to provide trainees with the hands-on practice needed. Game technology-based safety training platforms have the potential to overcome this problem in a virtual environment. One such platform is described in this paper - its characteristics are analysed and its possible contribution to safety training identified. This is developed and tested by means of a case study involving three major pieces of construction plant, which successfully demonstrates that the platform can improve the process and performance of the safety training involved in their operation. This research not only presents a new and useful solution to the safety training of construction operations, but illustrates the potential use of advanced technologies in solving construction industry problems in general. Copyright © 2011 Elsevier Ltd. All rights reserved.

  1. Geo-Information Technology of 8-Level Responsibility: Concept and Standard of Construction Management for Implementation of The BIM-Technology in Russia

    Science.gov (United States)

    Komosko, Vladimir; Serebryakov, Sergey; Strokov, Vladimir

    2017-12-01

    Currently, the increase in construction efficiency in the world is associated with the introduction and development of information modelling of construction objects (BIM-technology). The BIM-technology is a process of collective creation and use of information about a structure that forms the basis for all decisions throughout the life cycle of an object. The BIM-technology with the help of a number of software products provides automation of production, it does not provide a methodology for the introduction of these products. The article describes the technology of 8-level responsibility, which is guaranteed to give systematically a new quality of management in construction, related to the requirements of the Russian Government Decree No. 87 of February 16, 2008. The technology of 8-level responsibility (8LR) in the detailed specification of GD No. 87, (territory, construction stage, master plan object, section (part) of the project) extends the number of inseparable levels to 8 (part of the object, element, mark, position), where the “position” is the last indivisible detail of the object. There is reason to argue that the use of the “8LR Technology” in addition to the BIM-technology will provide a synergistic effect and will remove a number of obstacles to the BIM introduction in Russia and system control in the construction and operation of objects of any complexity in Russia.

  2. Applications and Prospects of Modularization Technology in HTR Project Starting from Primary Loop Cavity Construction

    International Nuclear Information System (INIS)

    Yang Guokang; Chen Jing; Huang Wen; Lin Lizhi; Sun Yunlun; Chen Yan; Mao Jiaxin; Wang Yougang; Wang Jinwen; Lin Mingfeng; Yang Mingshan

    2014-01-01

    Primary loop cavity is one of the key areas and major difficulties in HTR-PM project construction. In order to shorten the construction schedule and improve the construction quality, researches on modular design and construction of primary loop cavity has been carried out and the results have been applied in HTR-PM project construction, and got significant application benefit. This paper summarizes the modularization technology application research and project implementation results of primary loop cavity, and analyzes the application and prospects of modularization technology in the HTR project construction. (author)

  3. Occupational exposure to radon for underground tourist routes in Poland: Doses to lung and the risk of developing lung cancer

    Directory of Open Access Journals (Sweden)

    Katarzyna Walczak

    2017-10-01

    Full Text Available Objectives: Radon concentrations for 31 Polish underground tourist routes were analyzed. The equivalent dose to the lung, the effective dose and the relative risk were calculated for employees of the analyzed routes on the grounds of information on radon concentrations, work time, etc. Material and Methods: The relative risk for lung cancers was calculated using the Biological Effects of Ionizing Radiation (BEIR VI Committee model. Equivalent doses to the lungs of workers were determined using the coefficients calculated by the Kendall and Smith. The conversion coefficient proposed by the International Atomic Energy Agency (IAEA in the report No. 33 was used for estimating the effective doses. Results: In 13 routes, the effective dose was found to be above 1 mSv/year, and in 3 routes, it exceeded 6 mSv/year. For 5 routes, the equivalent dose to lungs was higher than 100 mSv/year, and in 1 case it was as high as 490 mSv/year. In 22.6% of underground workplaces the risk of developing lung cancer among employees was about 2 times higher than that for the general population, and for 1 tourist route it was about 5 times higher. The geometric mean of the relative risk of lung cancer for all workers of underground tourist routes was 1.73 (95% confidence interval (CI: 1.6–1.87. Routes were divided into: caves, mines, post-military underground constructions and urban underground constructions. Conclusions: The difference between levels of the relative risk of developing lung cancer for all types of underground tourist routes was not found to be significant. If we include the professional group of the employees of underground tourist routes into the group of occupational exposure, the number of persons who are included in the Category A due to occupational exposure may increase by about 3/4. The professional group of the employees of underground tourist routes should be monitored for their exposure to radon. Int J Occup Med Environ Health 2017;30(5:687

  4. Smooth Operator - Mobile Information Technology for Improved Flow at the Construction Site

    DEFF Research Database (Denmark)

    Tambo, Torben

    2010-01-01

    is used; mobility is classified as remote, local or micro. Furthermore an extensive literature study is employed along with both market screening for systems and case studies of companies adopting as well as rejecting the technology. Both within research communities, software manufacturers......Mobile information technology (IT) seems an ideal innovation to promote effectiveness of the construction process, particularly at the construction site; research has over the last 15 years focused on solutions, potentials and barriers with this field. This paper aim at the duality between research...... and industry for an updated and forward looking comprehension, and view of tendencies, of the roles and potentials of mobile IT at the construction site including potential for further research. Qualitative and interpretive methodology inspired by information systems and sociology of research and construction...

  5. Underground population defense structures in China

    Energy Technology Data Exchange (ETDEWEB)

    Wukasch, E.

    The design and construction ofunderground shelters to protect the Chinese population in the event of nuclear war are described. Built in the style of World War II air raid shelters and designed as neighborhood defense facilities, these are not judged to be adequate for nuclear defense needs, particularly the needs of urban populations. However, 80% of China's population is rural and 1/3 of this has lived underground for centuries in cliff dwellings and atrium houses. It is, therefore, concluded that China's rural population has a better chance the the population of any other country for long-term survival from the later consequences, as well as the immediate shock, of an urban nuclear attack. (LCL)

  6. UNDERGROUND ECONOMY, GDP AND STOCK MARKET

    Directory of Open Access Journals (Sweden)

    Caus Vasile Aurel

    2012-07-01

    Full Text Available Economic growth is affected by the size and dynamics of underground economy. Determining this size is a subject of research for many authors. In this paper we present the relationship between underground economy dynamics and the dynamics of stock markets. The observations are based on regression used by Tanzi (1983 and the relationship between GDP and stock market presented in Tudor (2008. The conclusion of this paper is that the dynamics of underground economy is influenced by dynamic of financial markets. Thus, using specific stock market mathematical tools analysis, one can analyze the dynamic of underground economy

  7. Capital Subsidies and the Underground Economy

    DEFF Research Database (Denmark)

    Busato, Francesco; Chiarini, Bruno; Angelis, Pasquale de

    In this paper we investigate the effects of different fiscal policies on the firm choice to produce underground. We consider a tax evading firm operating simultaneously both in the regular and in the underground economy. We suggest that such a kind of firm, referred to as moonlighting firm, is able...... allocation in the underground production. In fact, a strong and inverse relationship is found, and tax reduction is the best policy to reduce the convenience to produce underground. Wealso confirm the depressing effect on investment of taxation (see, for instance, Summers,1981), so that tax reduction has...

  8. Technology Trends and Opportunities for Construction Industry and Lifecycle Management

    OpenAIRE

    Janson, Vidar

    2017-01-01

    Master's thesis in for Offshore Technology: Industrial Asset Management The purpose of the report is to highlight methods that can make it easier for the construction industry and industry in general to benefit from new technology. The report is intended as a reference to technological solutions that along with some techniques, can streamline workflow for multiple tasks in planning, design, and operation and maintenance management. The problems focused on is how to: • Simplify the procu...

  9. Measurement of age of underground water, using tritium

    International Nuclear Information System (INIS)

    Chatani, Kunio; Kagami, Tadaaki; Tomita, Ban-ichi; Onuma, Akiko; Shoka, Yasushi

    1978-01-01

    Age of four kinds of underground water in Aichi prefecture was estimated by measuring a concentration of tritium. The tritium concentration was measured by the usual method. The first water-bearing zone of the shallow part, about 50m in depth, of Nobi plain is a new underground water cultivated within 20 years, whereas second water-bearing zone is an old underground water of 20 years old or more. No relationship of water flow between the first and the second water-bearing zone was observed. A very deep underground about 100m or more in depth, of the Nobi plain is confirmed to be infinite years old fossil water by measuring of tritium. The underground water in Atsumi peninsula is mostly a new underground water within 20 years. Only one out of eight showed the existence of old underground water before 20 years or more. The underground water of the granite area at Mikawa district is confirmed to be old underground water before 20 years or more. Alkaline underground water in the granite zone is considered to be very old in view of composition of water. The origin of underground water can be learned by tritium concentration, which shows whether the water is new water in the neighborhood of earth's surface or very old cultivated water. (Iwakiri, K.)

  10. Monitoring underground movements

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    On 16 September 2015 at 22:54:33 (UTC), an 8.3-magnitude earthquake struck off the coast of Chile. 11,650 km away, at CERN, a new-generation instrument – the Precision Laser Inclinometer (PLI) – recorded the extreme event. The PLI is being tested by a JINR/CERN/ATLAS team to measure the movements of underground structures and detectors.   The Precision Laser Inclinometer during assembly. The instrument has proven very accurate when taking measurements of the movements of underground structures at CERN.    The Precision Laser Inclinometer is an extremely sensitive device capable of monitoring ground angular oscillations in a frequency range of 0.001-1 Hz with a precision of 10-10 rad/Hz1/2. The instrument is currently installed in one of the old ISR transfer tunnels (TT1) built in 1970. However, its final destination could be the ATLAS cavern, where it would measure and monitor the fine movements of the underground structures, which can affect the precise posi...

  11. Tenth annual underground coal gasification symposium: proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Burwell, E.; Docktor, L.; Martin, J.W. (eds.)

    1984-12-01

    The Tenth Annual Underground Coal Gasification Symposium was cosponsored by the Fossil Energy Division of the US Department of Energy and the Morgantown Energy Technology Center's Laramie Projects Office. The purpose of the symposium was to provide a forum for presenting research results and for determining additional research needs in underground coal gasification. This years' meeting was held in Williamsburg, Virginia, during the week of August 12 through 15, 1984. Approximately 120 attendees representing industry, academia, national laboratories, Government, and eight foreign countries participated in the exchange of ideas, results, and future research plans. International representatives included participants from Belgium, Brazil, France, the Netherlands, New Zealand, Spain, West Germany, and Yugoslavia. During the three-day symposium, sixty papers were presented and discussed in four formal presentation sessions and two informal poster sessions. The papers describe interpretation of field test data, results of environmental research, and evaluations of laboratory, modeling, and economic studies. All papers in this Proceedings have been processed for inclusion in the Energy Data Base.

  12. Low cost construction technologies and materials - case study Mozambuique

    CSIR Research Space (South Africa)

    Kuchena, JC

    2009-09-01

    Full Text Available Low cost or affordable construction technologies and materials are often touted as a panacea in meeting the ever growing demand for rapid housing delivery in developing economies. Mozambique as with most of the developing world, from both historical...

  13. Observation and Detection of Underground Cellars in the Duero Basin By GNSS, Lidar and Ground Penetrating Radar Techniques

    OpenAIRE

    Conejo Martin, Miguel Angel; Herrero Tejedor, Tomás Ramón; Pérez Martín, Enrique; Lapazaran Izargain, Javier Jesús; Otero García, Jaime; Prieto Morin, Juan Francisco; Velasco Gomez, Jesus

    2013-01-01

    The underground cellars that appear in different parts of Spain are part of an agricultural landscape dispersed, sometimes damaged, others at risk of disappearing. This paper studies the measurement and display of a group of wineries located in Atauta (Soria), in the Duero River corridor. It is a unique architectural complex, facing rising, built on a smooth hillock as shown in Fig. 1. These constructions are excavated in the ground. The access to the cave or underground cellar has a shape of...

  14. New Modes of Constructive Technology Assessment for Developing Countries

    DEFF Research Database (Denmark)

    Christensen, David; Remmen, Arne

    of transformation or co-creation in a movement from one context to another, i.e. from the North to South. The question here is how to affect a proactive intake of relevant knowledge in decision-making in a technological innovation process so as to increase the likelihood of developing sustainable solutions. A co...... into actor strategies and decision-making processes. There is a variant of ‘constructive’ technology assessment that stands out as useful in multi-actor partnership settings. Placing emphasis on interactive processes, constructive technology assessment embraces active negotiation among involved parties...... in influencing technological change. In developing countries, technology assessment has received relatively little attention, but recent developments have expressed a ‘call-to-arms’ to tailor flexible approaches by ensuring the involvement of diverse stakeholders and citizens and continual learning among...

  15. Control of blast overpressure and vibrations at the Underground Research Laboratory

    International Nuclear Information System (INIS)

    Kuzyk, G.W.; Onagi, D.P.; Mohanty, B.

    1991-01-01

    AECL Research (AECL) has constructed an Underground Research Laboratory (URL) as a facility for research and development in the Canadian Nuclear Fuel Waste Management Program. The objectives of the program are to develop and evaluate the technology to ensure safe, permanent disposal of Canada's nuclear fuel waste. Several multidisciplinary experiments and engineering demonstrations are planned for the URL over the next ten years. In 1989, AECL excavated a test room for the Buffer/Container Experiment at the 240 Level. The blasts were designed to limit vibration and overpressure damage because the excavation was located close to existing furnishings and services that were very susceptible to blast-induced vibration and overpressure. An experimental room, which contained sensitive instrumentation, was located within 30 m of the initial blasts. A concrete floor slab, timber curtains and a bulkhead were installed to protect furnishings and services from fly-rock and overpressure. Five of the initial blasts were monitored. This paper describes the results of the monitoring program and the effectiveness of the blast design, floor slab and timber curtains and bulkhead in reducing blast overpressure and vibrations at the blast site. It is shown that greater than a 20-fold reduction in both blast vibrations and air overpressures can be achieved with specific combinations of blast design, installation of timber curtains and construction of a concrete floor slab

  16. Assessment of lung cancer risks for some categories of underground workers

    International Nuclear Information System (INIS)

    Dimitrov, M.

    1975-01-01

    In radioactive mines as well as in hardrock mines, tunnels under construction, and other underground workings, increased atmospheric levels of radioactive-gas daughter products are associated with a potential hazard of inhalation overexposure to workers. Absorbed dose from the alpha-activity component of deposition occurring in the process of breathing manifests a maximum in the area of secondary to quarternary bronchi. In this critical tissue, radiation exposure, along with other deleterious factors, produces conditions favourable to initiation of lung cancer, with a frequency of the latter proportional to cumulative dose. An assessment was made of absolute radiation risk to workers inhaling a radon-daughter contaminated atmosphere, on the basis of an estimated cumulative dose and a dose-response relation arrived at from epidemiological studies by other authors. For a range with a lower limit representing the product of maximum permissible concentration and half of the underground experience assigned to first category labor, and an upper limit determined by the product of maximum ''hidden'' alpha-decay energy measured and a full underground experience (180 months), cumulative exposures were found to vary from 90 to 8100 WLM. Rough estimates of corresponding lung cancer incidence ranged from 2 to 150 cases per year per 10,000 workers, versus 2-5 cases per year per 10,000 members of the general male population of the country. Results, obtained from a reconnaissance statistical study on a sample of 230 underground workers, with suitable working experiences and personal cumulative exposures, indicated a predicted frequency of lung cancer development of 0.43 cases per year, leading to an estimate of 19 cases per year per 10,000 workers. Such a magnitude of risk clearly shows an urgent need for introducing effective measures to improve radiological conditions in the occupational environment for a large proportion of the underground workers. (author)

  17. A Global Survey and Interactive Map Suite of Deep Underground Facilities; Examples of Geotechnical and Engineering Capabilities, Achievements, Challenges: (Mines, Shafts, Tunnels, Boreholes, Sites and Underground Facilities for Nuclear Waste and Physics R&D)

    Science.gov (United States)

    Tynan, M. C.; Russell, G. P.; Perry, F.; Kelley, R.; Champenois, S. T.

    2017-12-01

    This global survey presents a synthesis of some notable geotechnical and engineering information reflected in four interactive layer maps for selected: 1) deep mines and shafts; 2) existing, considered or planned radioactive waste management deep underground studies, sites, or disposal facilities; 3) deep large diameter boreholes, and 4) physics underground laboratories and facilities from around the world. These data are intended to facilitate user access to basic information and references regarding deep underground "facilities", history, activities, and plans. In general, the interactive maps and database [http://gis.inl.gov/globalsites/] provide each facility's approximate site location, geology, and engineered features (e.g.: access, geometry, depth, diameter, year of operations, groundwater, lithology, host unit name and age, basin; operator, management organization, geographic data, nearby cultural features, other). Although the survey is not all encompassing, it is a comprehensive review of many of the significant existing and historical underground facilities discussed in the literature addressing radioactive waste management and deep mined geologic disposal safety systems. The global survey is intended to support and to inform: 1) interested parties and decision makers; 2) radioactive waste disposal and siting option evaluations, and 3) safety case development as a communication tool applicable to any mined geologic disposal facility as a demonstration of historical and current engineering and geotechnical capabilities available for use in deep underground facility siting, planning, construction, operations and monitoring.

  18. A delegation from Singapore came to CERN on 18 October. The visitors are involved in planning a vast Underground Science City housing R&D laboratories and IT data centres.

    CERN Multimedia

    Hoch, Michael

    2010-01-01

    They came to learn from civil engineers and safety experts about how CERN plans and constructs its underground facilities. They visited the CMS site at Cessy, including the above-ground control room and the Underground Service Cavern.

  19. WEB-BASED DATABASE ON RENEWAL TECHNOLOGIES ...

    Science.gov (United States)

    As U.S. utilities continue to shore up their aging infrastructure, renewal needs now represent over 43% of annual expenditures compared to new construction for drinking water distribution and wastewater collection systems (Underground Construction [UC], 2016). An increased understanding of renewal options will ultimately assist drinking water utilities in reducing water loss and help wastewater utilities to address infiltration and inflow issues in a cost-effective manner. It will also help to extend the service lives of both drinking water and wastewater mains. This research effort involved collecting case studies on the use of various trenchless pipeline renewal methods and providing the information in an online searchable database. The overall objective was to further support technology transfer and information sharing regarding emerging and innovative renewal technologies for water and wastewater mains. The result of this research is a Web-based, searchable database that utility personnel can use to obtain technology performance and cost data, as well as case study references. The renewal case studies include: technologies used; the conditions under which the technology was implemented; costs; lessons learned; and utility contact information. The online database also features a data mining tool for automated review of the technologies selected and cost data. Based on a review of the case study results and industry data, several findings are presented on tren

  20. Cathode protection for underground steel tanks

    International Nuclear Information System (INIS)

    Angelovski, Zoran

    1998-01-01

    Cathodic protection of underground petroleum storage tanks and piping systems is acceptable for both economic and ecological reasons. With out the cathodic protection of underground steel reservoirs, short time after the exploitation, there was a bore as a result of underground corrosion. The bore causes ecological consequences and at the same time its repair needs big investments. Furthermore, there are great number of tanks placed near cities, so in the future this problem needs a special attention in order to preserve ecological surrounding. The topic of this paper is underground corrosion as well as cathodic protection of steel tanks for oil derivatives storage. (author)

  1. Fiscal 1999 research report. Support project for formation of the energy and environment technology demonstration project (International joint demonstration research). Underground coal gasification and cogeneration power plant construction plan; 1999 nendo sekitan chika gas ka oyobi netsuden heikyu plant kensetsu keikaku seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This research was made as the joint demonstration research project with National Mining University of Ukraine having abundant scientific information on underground coal gasification (UCG) technology. The research themes are as follows: (1) Verification of UCG element technologies, (2) Verification and proposal on combined cycle power generation, (3) Profitability of UCG, and (4) Future trend of UCG. The result of (1) on linking, ignition and UCG reaction process control technologies showed that the level of Ukraine is equivalent to that of leading western countries. Thermal behavior simulation on ground water, and experiment on mass transfer considering environment impact were also made. The result of (2) showed low calorific value of UCG gas, difficulty in use as chemical raw material or power generation fuel, and applicability to only small-scale cogeneration systems. The result of (3) showed the profitability of UCG gas higher than that of general coals. The result of (4) showed that in spite of various problems, UCG is very practical and promising as near future coal use technology. (NEDO)

  2. Henderson Deep Underground Science and Engineering Lab: Unearthing the secrets of the Universe, underground

    International Nuclear Information System (INIS)

    Jung, C.K.

    2011-01-01

    The Henderson Mine near Empire, Colorado is proposed to be the site to host a Deep Underground Science and Engineering Laboratory (DUSEL), which will have a rich program for forefront research in physics, biology, geosciences, and mining engineering. The mine is owned by the Climax Molybdenum Company (CMC). It is located about 50 miles west of Denver and is easily accessible via major highways. The mine is modern and has extensive infrastructure with reserve capacity well-suited to the demands of DUSEL. CMC owns all land required for DUSEL, including the tailings site. It also has all environmental and mining permits required for DUSEL excavation, core drilling, and rock disposal. The mine owners are enthusiastic supporters of this initiative. In support of the Henderson DUSEL project, the State of Colorado has pledged substantial funding for surface construction.

  3. 30 CFR 57.8519 - Underground main fan controls.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground main fan controls. 57.8519 Section... Ventilation Surface and Underground § 57.8519 Underground main fan controls. All underground main fans shall have controls placed at a suitable protected location remote from the fan and preferably on the surface...

  4. Work safety in the light of technological progress in mining. [Poland, accident and technology assessment for period 1950 to 1972

    Energy Technology Data Exchange (ETDEWEB)

    Stecko, R.

    1976-01-01

    This paper discusses positive and negative aspects of technological progress in black coal mining in Poland in the period from 1950 to 1972 on the basis of statistical data supplied by various institutions. Twenty three indexes characterizing both work safety and technological progress in underground coal mines are used. Equations of linear and non-linear even regression and equations of linear and non-linear multiple regression are derived on the basis of statistical records of 23 years. The equations are used to estimate indexes of work safety on the basis of technical progress indexes. It is suggested that from among 8 indexes characterizing work safety 4 are most useful and important: danger index, absenteeism index, frequency of underground fire index, and frequency of rock burst index. Analysis of the regression equation shows that technological progress in underground coal mines in Poland has caused a decrease in indexes describing: frequency of work accidents, frequency of underground fires, frequency of rock burst, and danger of underground work; and an increase in indexes characterizing: seriousness of work accidents, and absenteeism caused by work accidents. (84 refs.)

  5. Radioactivity of some specific underground workplaces in Hungary

    International Nuclear Information System (INIS)

    Szerbin, P.

    1998-01-01

    In this study, radon and radon daughter concentrations were measured in specific underground workplaces: in vine cellars, showcaves and caves for speleotherapeutic treatment of patients. These workplaces are considered to be affected by high radon concentrations, the workers in some cases can be exposed to radiation from radon and short-lived daughters at levels, comparable to those of other underground workplaces such as uranium mines. The aim of the study was to reveal the variation of the radon and radon progeny concentration, and to estimate the dose to the workers and visitors of these workplaces from the radon daughters. Seasonal variations of radon concentrations have been found in most of the caves investigated. The magnitude of the variation depends on the degree of isolation of the cave cavity from the outdoor atmosphere. The radon concentrations of the vine cellars were much lower than that of the caves. Because of the produced carbon dioxide gas in the process of sugar fermentation even the very old cellars are constructed well ventilated, consequently radon can not be accumulated in this underground cavities. From the measured radon and progeny concentrations cumulative potential alpha energy exposure, bronchial dose, and effective dose values were calculated for the staff, patients and visitors. The effective dose values for the cave personnel do not exceed the 10 mSv year -1 upper bound of the action level recommended for workplaces and even much lower for workers of cellars. The doses for visitors and patients were one or two magnitudes lower than that of the workers. (author)

  6. 40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.

    Science.gov (United States)

    2010-07-01

    ... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...

  7. A concept for the modernization of underground mining master maps based on the enrichment of data definitions and spatial database technology

    Science.gov (United States)

    Krawczyk, Artur

    2018-01-01

    In this article, topics regarding the technical and legal aspects of creating digital underground mining maps are described. Currently used technologies and solutions for creating, storing and making digital maps accessible are described in the context of the Polish mining industry. Also, some problems with the use of these technologies are identified and described. One of the identified problems is the need to expand the range of mining map data provided by survey departments to other mining departments, such as ventilation maintenance or geological maintenance. Three solutions are proposed and analyzed, and one is chosen for further analysis. The analysis concerns data storage and making survey data accessible not only from paper documentation, but also directly from computer systems. Based on enrichment data, new processing procedures are proposed for a new way of presenting information that allows the preparation of new cartographic representations (symbols) of data with regard to users' needs.

  8. Nuclear waste repository design and construction

    International Nuclear Information System (INIS)

    Bohlke, B.M.; Monsees, J.E.

    1987-01-01

    Extensive underground excavation will be required for construction of a mined geologic repository for nuclear waste. Hundreds of thousands of feet of drift will be required based on the conceptual layout design for each candidate nuclear waste repository. Comparison of boring and blasting excavation methods are discussed, as are special design and construction requirements (e.g., quality assurance procedures and performance assessment) for the nuclear waste repository. Comparisons are made between boring and blasting construction methods for the repository designs proposed for salt, volcanic tuff, and basalt

  9. Report on technical feasibility of underground pumped hydroelectric storage in a marble quarry site in the Northeast United States

    Energy Technology Data Exchange (ETDEWEB)

    Chas. T. Main, Inc.

    1982-03-01

    The technical and economic aspects of constructing a very high head underground hydroelectric pumped storage were examined at a prefeasibility level. Excavation of existing caverns in the West Rutland Vermont marble quarry would be used to construct the underground space. A plant capacity of 1200 MW and 12 h of continuous capacity were chosen as plant operating conditions. The site geology, plant design, and electrical and mechanical equipment required were considered. The study concluded that the cost of the 1200 MW underground pumped storage hydro electric project at this site even with the proposed savings from marketable material amounts to between $581 and $595 per kilowatt of installed capacity on a January 1982 pricing level. System studies performed by the planning group of the New England Power System indicate that the system could economically justify up to about $442 per kilowatt on an energy basis with no credit for capacity. To accommodate the plant with the least expensive pumping energy, a coal and nuclear generation mix of approximately 65% would have to be available before the project becomes feasible. It is not expected that this condition can be met before the year 2000 or beyond. It is therefore concluded that the West Rutland underground pumped storage facility is uneconomic at this time. Several variables however could have marked influence on future planning and should be examined on periodic basis.

  10. Underground geologic evaluation of the Grossschloppen vein-uranium deposit, West Germany

    International Nuclear Information System (INIS)

    Moore, S.C.; Erickson, A.J.; Kolb, S.G.; Maclean, C.J.

    1983-01-01

    The Grossschloppen vein-uranium deposit, Bavaria, West Germany, was examined utilizing underground workings during 1980-82 by Esso Er/ZETA/ GMbH, an affiliate of Exxon Minerals Company (EMC). Geologic evaluation entailed dense drilling of a portion of the deposit from workings constructed specifically for the program. Discovered in 1977, the deposit was initially explored by surface diamond drillholes which allowed definition of a 30-60 m wide vein system discontinuously mineralized along a 1000 m strike length and to at least a 450 m depth. The underground program was conceived as a cost effective procedure to answer questions on vein correlation, grade continuity and variability. A 1200 m decline allowed access for detailed sampling of approximately 10% of the known area of mineralization. Fanned drillholes, logged by gamma probe, were spaced to provide intersections of veins at 10 to 20 m intervals. Six cross cuts also penetrate the pitchblende and uranophane mineralization which occurs in 0.1 to 2.5 m thick quartz veins. Detailed cross-sections and level plans were constructed for resource estimates of the intensively studied portion of the vein system. The program resulted in the discovery of local, high grade areas and an average grade in the evaluated area nearly double that expected from surface drilling

  11. Underground disposal of radioactive wastes

    International Nuclear Information System (INIS)

    1981-01-01

    This report is an overview document for the series of IAEA reports dealing with underground waste disposal to be prepared in the next few years. It provides an introduction to the general considerations involved in implementing underground disposal of radioactive wastes. It suggests factors to be taken into account for developing and assessing waste disposal concepts, including the conditioned waste form, the geological containment and possible additional engineered barriers. These guidelines are general so as to cover a broad range of conditions. They are generally applicable to all types of underground disposal, but the emphasis is on disposal in deep geological formations. Some information presented here may require slight modifications when applied to shallow ground disposal or other types of underground disposal. Modifications may also be needed to reflect local conditions. In some specific cases it may be that not all the considerations dealt with in this book are necessary; on the other hand, while most major considerations are believed to be included, they are not meant to be all-inclusive. The book primarily concerns only underground disposal of the wastes from nuclear fuel cycle operations and those which arise from the use of isotopes for medical and research activities

  12. Underground nuclear power station using self-regulating heat-pipe controlled reactors

    International Nuclear Information System (INIS)

    Hampel, V.E.

    1989-01-01

    The author presents a nuclear reactor for generating electricity disposed underground at the bottom of a vertical hole that can be drilled using conventional drilling technology. The primary coolant of the reactor core is the working fluid in a plurality of thermodynamically coupled heat pipes emplaced in the hole between the heat source at the bottom of the hole and heat exchange means near the surface of the earth. Additionally, the primary coolant (consisting of the working fluid in the heat pipes in the reactor core) moderates neutrons and regulates their reactivity, thus keeping the power of the reactor substantially constant. At the end of its useful life, the reactor core may be abandoned in place. Isolation from the atmosphere in case of accident or for abandonment is provided by the operation of explosive closures and mechanical valves emplaced along the hole. This invention combines technology developed and tested for small, highly efficient, space-based nuclear electric power plants with the technology of fast-acting closure mechanisms developed and used for underground testing of nuclear weapons. This invention provides a nuclear power installation which is safe from the worst conceivable reactor accident, namely, the explosion of a nuclear weapon near the ground surface of a nuclear power reactor

  13. Underground nuclear power station using self-regulating heat-pipe controlled reactors

    Science.gov (United States)

    Hampel, Viktor E.

    1989-01-01

    A nuclear reactor for generating electricity is disposed underground at the bottom of a vertical hole that can be drilled using conventional drilling technology. The primary coolant of the reactor core is the working fluid in a plurality of thermodynamically coupled heat pipes emplaced in the hole between the heat source at the bottom of the hole and heat exchange means near the surface of the earth. Additionally, the primary coolant (consisting of the working flud in the heat pipes in the reactor core) moderates neutrons and regulates their reactivity, thus keeping the power of the reactor substantially constant. At the end of its useful life, the reactor core may be abandoned in place. Isolation from the atmosphere in case of accident or for abandonment is provided by the operation of explosive closures and mechanical valves emplaced along the hole. This invention combines technology developed and tested for small, highly efficient, space-based nuclear electric power plants with the technology of fast-acting closure mechanisms developed and used for underground testing of nuclear weapons. This invention provides a nuclear power installation which is safe from the worst conceivable reactor accident, namely, the explosion of a nuclear weapon near the ground surface of a nuclear power reactor.

  14. Impact of In Situ Stress Distribution Characteristics on Jointed Surrounding Rock Mass Stability of an Underground Cavern near a Hillslope Surface

    Directory of Open Access Journals (Sweden)

    Bangxiang Li

    2017-01-01

    Full Text Available In this paper, a series of numerical simulations are performed to analyze the in situ stress distribution characteristics of the rock mass near different slope angles hillslope surfaces, which are subjected to the vertical gravity stress and different horizontal lateral stresses and the influence which the in situ stress distribution characteristics of 45° hillslope to the integral stability of surrounding rock mass when an underground cavern is excavated considering three different horizontal distances from the underground cavern to the slope surface. It can be concluded from the numerical results that different slope angles and horizontal lateral stresses have a strong impact on the in situ stress distribution and the integral surrounding rock mass stability of the underground cavern when the horizontal distance from the underground cavern to the slope surface is approximately 100 m to 200 m. The relevant results would provide some important constructive suggestions to the engineering site selection and optimization of large-scale underground caverns in hydropower stations.

  15. A Comparison of underground opening support design methods in jointed rock mass

    International Nuclear Information System (INIS)

    Gharavi, M.; Shafiezadeh, N.

    2008-01-01

    It is of great importance to consider long-term stability of rock mass around the openings of underground structure. during design, construction and operation of the said structures in rock. In this context. three methods namely. empirical. analytical and numerical have been applied to design and analyze the stability of underground infrastructure at the Siah Bisheh Pumping Storage Hydro-Electric Power Project in Iran. The geological and geotechnical data utilized in this article were selected and based on the preliminary studies of this project. In the initial stages of design. it was recommended that, two methods of rock mass classification Q and rock mass rating should be utilized for the support system of the underground cavern. Next, based on the structural instability, the support system was adjusted by the analytical method. The performance of the recommended support system was reviewed by the comparison of the ground response curve and rock support interactions with surrounding rock mass, using FEST03 software. Moreover, for further assessment of the realistic rock mass behavior and support system, the numerical modeling was performed utilizing FEST03 software. Finally both the analytical and numerical methods were compared, to obtain satisfactory results complimenting each other

  16. The "Second Place" Problem: Assistive Technology in Sports and (Re) Constructing Normal.

    Science.gov (United States)

    Baker, D A

    2016-02-01

    Objections to the use of assistive technologies (such as prostheses) in elite sports are generally raised when the technology in question is perceived to afford the user a potentially "unfair advantage," when it is perceived as a threat to the purity of the sport, and/or when it is perceived as a precursor to a slippery slope toward undesirable changes in the sport. These objections rely on being able to quantify standards of "normal" within a sport so that changes attributed to the use of assistive technology can be judged as causing a significant deviation from some baseline standard. This holds athletes using assistive technologies accountable to standards that restrict their opportunities to achieve greatness, while athletes who do not use assistive technologies are able to push beyond the boundaries of these standards without moral scrutiny. This paper explores how constructions of fairness and "normality" impact athletes who use assistive technology to compete in a sporting venue traditionally populated with "able-bodied" competitors. It argues that the dynamic and obfuscated construction of "normal" standards in elite sports should move away from using body performance as the measuring stick of "normal," toward alternate forms of constructing norms such as defining, quantifying, and regulating the mechanical actions that constitute the critical components of a sport. Though framed within the context of elite sports, this paper can be interpreted more broadly to consider problems with defining "normal" bodies in a society in which technologies are constantly changing our abilities and expectations of what normal means.

  17. Use of communication technologies in document exchange for the management of construction projects

    Directory of Open Access Journals (Sweden)

    Mesároš Peter

    2016-06-01

    Full Text Available Information and communication technologies represent a set of people, processes, technical and software tools providing collection, transport, storage and processing of data for distribution and presentation of information. Particularly communication systems are the main tool for information exchange. Of the other part, these technologies have a broad focus and use. One of them is the exchange of documents in the management of construction projects. Paper discusses the issue of exploitation level of communication technologies in construction project management. The main objective of this paper is to analyze exploitation level of communication technologies. Another aim of the paper is to compare exploitation level or rate of document exchange by electronic communication devices and face-to-face communication.

  18. Use of communication technologies in document exchange for the management of construction projects

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2016-06-01

    Information and communication technologies represent a set of people, processes, technical and software tools providing collection, transport, storage and processing of data for distribution and presentation of information. Particularly communication systems are the main tool for information exchange. Of the other part, these technologies have a broad focus and use. One of them is the exchange of documents in the management of construction projects. Paper discusses the issue of exploitation level of communication technologies in construction project management. The main objective of this paper is to analyze exploitation level of communication technologies. Another aim of the paper is to compare exploitation level or rate of document exchange by electronic communication devices and face-to-face communication.

  19. Regulating and Combating Underground Banking

    NARCIS (Netherlands)

    Borgers, M.J.

    2009-01-01

    In combating and regulating underground banking, a choice can be made of roughly two models, the risk model and the assimilation model. The risk model comes down to a complete prohibition of underground banking combined with an active investigation and prosecution policy. In the assimilation model,

  20. Mission of mediation on planting underground research laboratories

    International Nuclear Information System (INIS)

    Bataille, C.

    1994-01-01

    France, who chose to have a strong nuclear industry, is confronted to the problem of management, treatment, storage and elimination of radioactive waste. The law defined an important research program with a study of underground storage in laboratories. Here is the report of this mission. A problem of people confidence arose; there is a difference between the great level of science or technology and the level of understanding of public opinion. The only answer brought by a democratic society is to develop information

  1. The underground research laboratory room 209 excavation response test

    International Nuclear Information System (INIS)

    Simmons, G.R.

    1992-02-01

    The response of the rock mass to excavation is an important factor in the design and performance of underground excavations and installations. This is particularly true in the excavation of vaults for the disposal of nuclear fuel waste, where the conditions in the rock mass around the disposal areas may affect the performance of engineered sealing systems installed to isolate the waste. The factors influencing, and mechanisms controlling, rock mass response to excavation must be understood in order to accommodate excavation response effects in disposal vault design and construction

  2. Expertize of hydrochemical investigation Know-how for deep underground

    International Nuclear Information System (INIS)

    Iwatsuki, Teruki; Mizuno, Takashi; Amano, Yuki; Kunimaru, Takanori; Semba, Takeshi

    2012-03-01

    This report summarizes technical basis and the Know-how on hydrochemical investigations for deep underground as a part of METI project 'Development of Information Synthesis and Interpretation System (ISIS)'. We describe the procedures and methods of hydrochemical investigation in following stages; 1) initial analysis of previous information, 2) planning of borehole investigation, 3) borehole investigation at field, and 4) construct the 'hydrochemical model' representing hydrochemical condition and the evolution process. The contents of this report are inputted to 'Expert system' developed by METI project and are available on WEB system (internet). (author)

  3. Real-Time Location-Based Rendering of Urban Underground Pipelines

    Directory of Open Access Journals (Sweden)

    Wei Li

    2018-01-01

    Full Text Available The concealment and complex spatial relationships of urban underground pipelines present challenges in managing them. Recently, augmented reality (AR has been a hot topic around the world, because it can enhance our perception of reality by overlaying information about the environment and its objects onto the real world. Using AR, underground pipelines can be displayed accurately, intuitively, and in real time. We analyzed the characteristics of AR and their application in underground pipeline management. We mainly focused on the AR pipeline rendering procedure based on the BeiDou Navigation Satellite System (BDS and simultaneous localization and mapping (SLAM technology. First, in aiming to improve the spatial accuracy of pipeline rendering, we used differential corrections received from the Ground-Based Augmentation System to compute the precise coordinates of users in real time, which helped us accurately retrieve and draw pipelines near the users, and by scene recognition the accuracy can be further improved. Second, in terms of pipeline rendering, we used Visual-Inertial Odometry (VIO to track the rendered objects and made some improvements to visual effects, which can provide steady dynamic tracking of pipelines even in relatively markerless environments and outdoors. Finally, we used the occlusion method based on real-time 3D reconstruction to realistically express the immersion effect of underground pipelines. We compared our methods to the existing methods and concluded that the method proposed in this research improves the spatial accuracy of pipeline rendering and the portability of the equipment. Moreover, the updating of our rendering procedure corresponded with the moving of the user’s location, thus we achieved a dynamic rendering of pipelines in the real environment.

  4. Involving users in the development of embedded technology in construction

    DEFF Research Database (Denmark)

    Storgaard, Kresten; Buch-Hansen, Thomas Cornelius; Ærenlund, Lærke

    2011-01-01

    Based on a project about user driven innovation and embedded technology in construction (BIIB), the paper discusses methodological issues on user involvement. In the paper especially focus is on the experiences on involving users in collaborative development of scenarios, in the validation...... of scenarios and in developing innovative solutions on a conceptual level. The project discusses 1) concepts of users and 2) methods for collaborative involvement. The first discussion involves presentation of an extended user concept and a discussion of differences between lead users and need-advanced users....... The second discussion on collaborative involvement, discuss experiences with methods for communication across cultural and professional competences with reference to boundary objects, tangible systems and visualization. In the project four segments of situations for use of embedded technology in construction...

  5. Construction and discussion of the science and technology information network of SWIP

    International Nuclear Information System (INIS)

    Wang Li; Zhang Yiming

    2010-01-01

    The digital library needs to be developed with the advancement of digitalisation and network, and the construction of digital information resource is more indispensable. This paper introduces the exploration and the work performed by the Research Office of Science and Technology Information of the Southwestern Institute of Physics with respect to preliminary construction of science and technology (S and T) information network resources and the magnitude alteration of S and T information service platform subsequently and the building of a dynamical network information service mode of its own characteristics. (authors)

  6. Analysis of world experience in constructing underground small nuclear power plants and assessment of its potential use in the Russian Arctic regions

    Directory of Open Access Journals (Sweden)

    Smirnov Yu. G.

    2016-03-01

    Full Text Available The paper considers the common ideology and main idea of locating underground nuclear plants. Specific examples in domestic and foreign experience have been analyzed. It has been established that underground small nuclear power plants can be used as an alternative source of electric and thermal energy for solving defense-strategic and social-economic tasks particularly when developing mineral raw material resources in the Russian Arctic regions

  7. Construction safety in DOE. Part 2, Students guide

    Energy Technology Data Exchange (ETDEWEB)

    Handwerk, E.C.

    1993-08-01

    This report is the second part of a compilation of safety standards for construction activities on DOE facilities. This report covers the following areas: floor and wall openings; cranes, derricks, hoists, elevators, and conveyors; motor vehicles, mechanized equipment, and marine operations; excavations; concrete and masonry construction; steel erection; underground construction, caisson, cofferdams, and compressed air; demolition; blasting and the use of explosives; power transmission and distribution; rollover protective structures, overhead protection; and ladders.

  8. Occupational exposure to radon for underground tourist routes in Poland: Doses to lung and the risk of developing lung cancer.

    Science.gov (United States)

    Walczak, Katarzyna; Olszewski, Jerzy; Politański, Piotr; Zmyślony, Marek

    2017-07-14

    Radon concentrations for 31 Polish underground tourist routes were analyzed. The equivalent dose to the lung, the effective dose and the relative risk were calculated for employees of the analyzed routes on the grounds of information on radon concentrations, work time, etc. The relative risk for lung cancers was calculated using the Biological Effects of Ionizing Radiation (BEIR) VI Committee model. Equivalent doses to the lungs of workers were determined using the coefficients calculated by the Kendall and Smith. The conversion coefficient proposed by the International Atomic Energy Agency (IAEA) in the report No. 33 was used for estimating the effective doses. In 13 routes, the effective dose was found to be above 1 mSv/year, and in 3 routes, it exceeded 6 mSv/year. For 5 routes, the equivalent dose to lungs was higher than 100 mSv/year, and in 1 case it was as high as 490 mSv/year. In 22.6% of underground workplaces the risk of developing lung cancer among employees was about 2 times higher than that for the general population, and for 1 tourist route it was about 5 times higher. The geometric mean of the relative risk of lung cancer for all workers of underground tourist routes was 1.73 (95% confidence interval (CI): 1.6-1.87). Routes were divided into: caves, mines, post-military underground constructions and urban underground constructions. The difference between levels of the relative risk of developing lung cancer for all types of underground tourist routes was not found to be significant. If we include the professional group of the employees of underground tourist routes into the group of occupational exposure, the number of persons who are included in the Category A due to occupational exposure may increase by about 3/4. The professional group of the employees of underground tourist routes should be monitored for their exposure to radon. Int J Occup Med Environ Health 2017;30(5):687-694. This work is available in Open Access model and licensed under a CC

  9. Injection technologies for the repair of damaged concrete structures

    CERN Document Server

    Panasyuk, V V; Sylovanyuk, V P

    2014-01-01

    This book analyzes the most important achievements in science and engineering practice concerning operational factors that cause damage to concrete and reinforced concrete structures. It includes methods for assessing their strength and service life, especially those that are based on modern concepts of the fracture mechanics of materials. It also includes basic approaches to the prediction of the remaining service life for long-term operational structures. Much attention is paid to injection technologies for restoring the serviceability of damaged concrete and reinforced concrete structures. In particular, technologies for remedying holes, cracks, corrosion damages etc. The books contains sample cases in which the above technologies have been used to restore structural integrity and extend the reliable service life of concrete and reinforced concrete constructions, especially NPPs, underground railways, bridges, seaports and historical relics.

  10. Groundwater and underground coal gasification in Alberta

    International Nuclear Information System (INIS)

    Haluszka, A.; MacMillan, G.; Maev, S.

    2010-01-01

    Underground coal gasification has potential in Alberta. This presentation provided background information on underground coal gasification and discussed groundwater and the Laurus Energy demonstration project. A multi-disciplined approach to project assessment was described with particular reference to geologic and hydrogeologic setting; geologic mapping; and a hydrogeologic numerical model. Underground coal gasification involves the conversion of coal into synthesis gas or syngas. It can be applied to mined coal at the surface or applied to non-mined coal seams using injection and production wells. Underground coal gasification can effect groundwater as the rate of water influx into the coal seams influences the quality and composition of the syngas. Byproducts created include heat as well as water with dissolved concentrations of ammonia, phenols, salts, polyaromatic hydrocarbons, and liquid organic products from the pyrolysis of coal. A process overview of underground coal gasification was also illustrated. It was concluded that underground coal gasification has the potential in Alberta and risks to groundwater could be minimized by a properly designed project. refs., figs.

  11. Construction Project Performance Improvement through Radio Frequency Identification Technology Application on a Project Supply Chain

    Science.gov (United States)

    Wang, Heng

    2017-01-01

    Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…

  12. BIM integration in education: A case study of the construction technology project Bolt Tower Dolni Vitkovice

    Directory of Open Access Journals (Sweden)

    Venkrbec Vaclav

    2017-12-01

    Full Text Available Building information modeling (BIM can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.

  13. BIM integration in education: A case study of the construction technology project Bolt Tower Dolni Vitkovice

    Science.gov (United States)

    Venkrbec, Vaclav; Bittnerova, Lucie

    2017-12-01

    Building information modeling (BIM) can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.

  14. Underground Corrosion by Microorganisms Part II : Role of Anaerobic Sulphate Reducing Bacteria-Desulfotomaculum SP

    OpenAIRE

    H. M. Dayal; K. C. Tiwari; Kamlesh Mehta; Mr. Chandrashekhar

    1988-01-01

    During the course of studies on the corrosion causing soil microflora from different geoclimatic regions of India, several strains of anaerobic sulphate reducing bacteria belonging to genus Desulfotomaculum were isolated and characterised. Their corrosive action on mild steel, galvanised iron and structural aluminium, the three main metals of construction of underground structures, have been studied under laboratory conditions.

  15. A concept for the modernization of underground mining master maps based on the enrichment of data definitions and spatial database technology

    Directory of Open Access Journals (Sweden)

    Krawczyk Artur

    2018-01-01

    Full Text Available In this article, topics regarding the technical and legal aspects of creating digital underground mining maps are described. Currently used technologies and solutions for creating, storing and making digital maps accessible are described in the context of the Polish mining industry. Also, some problems with the use of these technologies are identified and described. One of the identified problems is the need to expand the range of mining map data provided by survey departments to other mining departments, such as ventilation maintenance or geological maintenance. Three solutions are proposed and analyzed, and one is chosen for further analysis. The analysis concerns data storage and making survey data accessible not only from paper documentation, but also directly from computer systems. Based on enrichment data, new processing procedures are proposed for a new way of presenting information that allows the preparation of new cartographic representations (symbols of data with regard to users’ needs.

  16. Rock index properties for geoengineering in underground development

    International Nuclear Information System (INIS)

    O'Rourke, J.E.

    1989-01-01

    This paper describes the use of index testing to obtain rock properties that are useful in the design and construction planning of an underground development for civil engineering or mining projects. The index properties discussed include: point load; Schmidt hammer hardness; abrasion hardness; and total hardness. The first two index properties correlate to uniaxial compressive strength (UCS) and Young's modulus. Discussions are given on empirical, normalized relationships of UCS to rock mass properties and the integrated use with semi-empirical, geotechnical design methods. The hardness property indices correlate to construction performance parameters and some relevant experience is cited. Examples of data are presented from an index testing program carried out primarily on siltstone, sandstone and limestone rock core samples retrieved from depths up to 1005 m (3300 ft) in a borehole drilled in the Paradox Basin in eastern Utah. The borehole coring was done for a nuclear waste repository site investigation

  17. A Fiber Bragg Grating-Based Monitoring System for Roof Safety Control in Underground Coal Mining

    Directory of Open Access Journals (Sweden)

    Yiming Zhao

    2016-10-01

    Full Text Available Monitoring of roof activity is a primary measure adopted in the prevention of roof collapse accidents and functions to optimize and support the design of roadways in underground coalmines. However, traditional monitoring measures, such as using mechanical extensometers or electronic gauges, either require arduous underground labor or cannot function properly in the harsh underground environment. Therefore, in this paper, in order to break through this technological barrier, a novel monitoring system for roof safety control in underground coal mining, using fiber Bragg grating (FBG material as a perceived element and transmission medium, has been developed. Compared with traditional monitoring equipment, the developed, novel monitoring system has the advantages of providing accurate, reliable, and continuous online monitoring of roof activities in underground coal mining. This is expected to further enable the prevention of catastrophic roof collapse accidents. The system has been successfully implemented at a deep hazardous roadway in Zhuji Coal Mine, China. Monitoring results from the study site have demonstrated the advantages of FBG-based sensors over traditional monitoring approaches. The dynamic impacts of progressive face advance on roof displacement and stress have been accurately captured by the novel roadway roof activity and safety monitoring system, which provided essential references for roadway support and design of the mine.

  18. Mechanisms and sources of radon entry in buildings constructed with modern technologies

    International Nuclear Information System (INIS)

    Zhukovsky, M.V.; Vasilyev, A.V.

    2014-01-01

    To investigate the influence of modern building construction technologies on the accumulation of radon indoor, 20 rooms in buildings constructed using mostly monolithic concrete or aerated concrete blocks have been studied. Dominance of the diffusion mechanism of radon entry in buildings constructed with modern technologies has been established. As a result of computer simulations it was found that the main contribution to the variability of radon concentration was made by changes in the ventilation rate. At a low ventilation rate ( -1 ) radon concentration above 200 Bq m -3 can be observed for residential buildings. There is a need for the regulation of the radium-specific activity in building materials. According to the estimates of this study, the content of 226 Ra in building materials should not exceed the value of 100 Bq kg -1 . (authors)

  19. THREE-DIMENSIONAL GEOFILTRATIONAL MODEL OF THE ROGUN HYDRO POWER PLANT CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Khokhotva Sergey Nikolaevich

    2017-05-01

    Full Text Available The article deals with technique of creation and results of calculations of the three-dimensional geofiltrational model of the Rogun HPP construction site. When performing works on creation of the Rogun HPP three-dimensional geofiltration model, geological and hydrogeological conditions of the Rogun HPP construction site were analyzed. They showed that the construction site consists mostly of fractured rocks of various weathering degrees. In terms of preservation, four preservation zones were identified in the rock mass. These zones define the features of hydrogeological conditions that have emerged in the area of construction. Calculation results illustrated the absence of seepage areas on the lower slope of dam; this is the indication of normal operation of the dam impervious circuit. The drainage system of the underground hydropower plant has a high efficiency. Operation of the drainage galleries complex leads to a significant reduction of piezometric pressure on roofs of the machine and transformer halls. Above the underground structures a completely drained area is formed. Completed forecast calculations on geofiltration model of the Rogun hydropower plant determine the hydrostatic pressure and piezometric pressure at any point of the modeled area. These data can be used as loads while designing of lining of underground workings.

  20. Viewing Systems for Large Underground Storage Tanks

    International Nuclear Information System (INIS)

    Heckendorn, F.M.; Robinson, C.W.; Anderson, E.K.; Pardini, A.F.

    1996-01-01

    Specialized remote video systems have been successfully developed and deployed in a number of large radiological Underground Storage Tanks (USTs)that tolerate the hostile tank interior, while providing high resolution video to a remotely located operator. The deployment is through 100 mm (4 in) tank openings, while incorporating full video functions of the camera, lights, and zoom lens. The usage of remote video minimizes the potential for personnel exposure to radiological and hazardous conditions, and maximizes the quality of the visual data used to assess the interior conditions of both tank and contents. The robustness of this type of remote system has a direct effect on the potential for radiological exposure that personnel may encounter. The USTs typical of the Savannah River and Hanford Department Of Energy - (DOE) sites are typically 4.5 million liter (1.2 million gal) units under earth. or concrete overburden with limited openings to the surface. The interior is both highly contaminated and radioactive with a wide variety of nuclear processing waste material. Some of the tanks are -flammable rated -to Class 1, Division 1,and personnel presence at or near the openings should be minimized. The interior of these USTs must be assessed periodically as part of the ongoing management of the tanks and as a step towards tank remediation. The systems are unique in their deployment technology, which virtually eliminates the potential for entrapment in a tank, and their ability to withstand flammable environments. A multiplicity of components used within a common packaging allow for cost effective and appropriate levels of technology, with radiation hardened components on some units and lesser requirements on other units. All units are completely self contained for video, zoom lens, lighting, deployment,as well as being self purging, and modular in construction

  1. Modelling of underground geomechanical characteristics for electrophysical conversion of oil shale

    International Nuclear Information System (INIS)

    Bukharkin, A A; Koryashov, I A; Martemyanov, S M; Ivanov, A A

    2015-01-01

    Oil shale energy extraction is an urgent issue for modern science and technique. With the help of electrical discharge phenomena it is possible to create a new efficient technology for underground conversion of oil shale to shale gas and oil. This method is based on Joule heat in the rock volume. During the laboratory experiments the problem has arisen, when the significant part of a shale fragment is being heated, but the further heating is impossible due to specimen cracking. It leads to disruption in current flow and heat exchange. Evidently, in the underground conditions these failure processes will not proceed. Cement, clay and glass fiber/epoxy resin armature have been used for modelling of geomechanical underground conditions. Experiments have shown that the use of a reinforcing jacket makes it possible to convert a full rock fragment. Also, a thermal field extends radially from the centre of a tree-type structure, and it has an elliptic cross section shape. It is explained by the oil shale anisotropy connected with a rock laminar structure. Therefore, heat propagation is faster along the layers than across ones. (paper)

  2. A study of feasibility, design and cost of excavations for underground siting of nuclear power plants

    International Nuclear Information System (INIS)

    1976-02-01

    A study conducted for the State Power Board on underground siting of nuclear power plants is presented. The report is divided into two chapters, both concerning the technical aspects of large underground openings. The first chapter gives a brief general survey of the problems involved, and the second outlines the technical aspects of a PWR project at a specific site. Details are given in 8 appendices and arrangement drawings. The project differs from conventional hydroelectric excavation schemes mainly in the fact that the spherical reactor containment requires a vault of 60m free span, and the turbine hall a cylindrical vault of 45m span, both of which exceed any span hitherto built for similar purposes. This requires a comparatively wide extrapolation of tested and available experience in underground excavations for permanent civil use. To what extent and under what circumstances such extrapolation is tenable must be tested in practice, preferably in a specially controlled prototype test. However the study indicates that conventional nuclear power plants can be sited underground when the topography and rock conditions are suitable. A 1000-2000 MW conventional plant adapted for underground siting will require large span caverns, tunnels and shafts, totalling about 1.0 mill. cubic metres of underground excavation. In addition access and cooling water tunnels, depending on the location, will require 0.2-0.5 mill. cubic metres of tunnel excavations. The excavations and support work can be completed within a construction time of about 2 1/2 years at an estimated total cost of 215 mill. Norwegian kroner (1975 value). (JIW)

  3. Analysis of floor technology scheme in open-top construction of nuclear power project

    International Nuclear Information System (INIS)

    Zhang Shuxia; Lu Qinwu; Han Xiaoping

    2014-01-01

    Open-top construction is general technology in Ⅲ generation in nuclear power project. Because traditional floor structure and its form board upholding doesn't meet open-top construction, four floor scheme are presented, whose characters, advantages and disadvantages, and its application are summarized. The research results will help to the application of open-top construction. (authors)

  4. ATLAS, Construction of a Giant

    CERN Multimedia

    McCubbin, Norman

    2004-01-01

    One of the most impressive aspects of modern particle physics in the scale of the equipment. The accelerators require the construction of underground tunnels many kilometers long containing evacuated pipes through which beams of particles travel at incredibly high energies. Even more spectacular are the gigantic complex assemblies that make up the experiments themselves

  5. From Ideas to Opportunities: Exploring the Construction of Technology-Based Entrepreneurial Opportunities

    Directory of Open Access Journals (Sweden)

    Ferran Giones

    2013-06-01

    Full Text Available The transformation of business ideas into market opportunities is at the core of entrepreneurship. Nevertheless, the complexity of such a transformative process is seen to change depending on the variables influencing the opportunity-entrepreneur nexus. Although technology-entrepreneurship is regarded as a force of change and dynamism in socio-economic growth, it also depends upon an intricate process of opportunity development. The interest in understanding better how technology-based entrepreneurs simultaneously cope with technological uncertainty while trying to gain stakeholder support and access to resources, highlights a relevant research gap. The research described in this article uses the constructivist view to deepen our understanding of the technology-based entrepreneur’s conceptualization of the opportunity as a process of social construction. Our results show how initial consensus-building efforts and iteration with knowledgeable peers are an essential part of the emergence of the opportunity, changing both entrepreneur's and stakeholders' perceptions of the early business idea. Consequently, our results provide evidence in support of policy programs and measures that favour social-construction support mechanisms to foster technology-based entrepreneurship.

  6. Design, construction, operation, shutdown and surveillance of repositories for solid radioactive wastes in shallow ground

    International Nuclear Information System (INIS)

    1984-01-01

    This report is a part of the IAEA publications under its Programme on Underground Disposal of Radioactive Wastes and is addressed to administrative and technical authorities and specialists who consider the shallow-ground disposal of low- and intermediate-level solid radioactive wastes of short half-lives. The report emphasizes the technological aspects, however it briefly discusses the safety philosophy and regulatory considerations too. The design, construction, operation, shutdown and surveillance of the repositories in shallow ground are considered in some detail, paying special attention to their interrelated aspects. In particular, a review is given of the following aspects: main design and construction considerations in relation to the natural features of the site; design and construction aspects during the repository development process; activities related to operational and post-operational stages of the repository; major steps in repository operation and essential activities in shutdown and operational and post-operational surveillance

  7. An overview of the geological controls in underground coal gasification

    Science.gov (United States)

    Mohanty, Debadutta

    2017-07-01

    Coal’s reign will extend well into this millennium as the global demand for coal is expected to increase on average by 2-1% per year through 2019. Enhanced utilization of the domestic coal resource through clean coal technologies is necessary to meet the energy needs while achieving reduced emissions. Underground coal gasification (UCG) is one of such potential technologies. Geology of the area plays decisive role throughout the life of a UCG project and imperative for every phase of the project cycle starting from planning, site selection, design to cessation of operations and restoration of the site. Impermeable over/underlying strata with low porosity and less deformation are most suitable for UCG processes as they act as seal between the coal seam and the surrounding aquifers while limiting the degree of subsidence. Inrush of excess water into the gasification chamber reduces the efficacy of the process and may even quench the reactions in progress. Presence of fresh water aquifer in the vicinity of target coal seam should be abandoned in order to avoid groundwater contamination. UCG is not a proven technology that is still evolving and there are risks that need to be monitored and managed. Effective shutdown programme should intend at minimising the post-burn contaminant generation by flushing out potential organic and inorganic contaminants from the underground strata and treating contaminants, and to restore ground water quality to near baseline conditions.

  8. An underground nuclear power station using self-regulating heat-pipe controlled reactors

    Science.gov (United States)

    Hampel, V.E.

    1988-05-17

    A nuclear reactor for generating electricity is disposed underground at the bottom of a vertical hole that can be drilled using conventional drilling technology. The primary coolant of the reactor core is the working fluid in a plurality of thermodynamically coupled heat pipes emplaced in the hole between the heat source at the bottom of the hole and heat exchange means near the surface of the earth. Additionally, the primary coolant (consisting of the working fluid in the heat pipes in the reactor core) moderates neutrons and regulates their reactivity, thus keeping the power of the reactor substantially constant. At the end of its useful life, the reactor core may be abandoned in place. Isolation from the atmosphere in case of accident or for abandonment is provided by the operation of explosive closures and mechanical valves emplaced along the hole. This invention combines technology developed and tested for small, highly efficient, space-based nuclear electric power plants with the technology of fast- acting closure mechanisms developed and used for underground testing of nuclear weapons. This invention provides a nuclear power installation which is safe from the worst conceivable reactor accident, namely, the explosion of a nuclear weapon near the ground surface of a nuclear power reactor. 5 figs.

  9. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthelemy, Michel; Escobar Rangel, Lina

    2013-01-01

    This paper provides the first comparative analysis of nuclear reactor construction costs in France and the United States. Studying the cost of nuclear power has often been a challenge, owing to the lack of reliable data sources and heterogeneity between countries, as well as the long time horizon which requires controlling for input prices and structural changes. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using expected demand variation as an instrument. We argue that benefits from nuclear reactor program standardization can arise through short term coordination gains, when the diversity of nuclear reactors' technologies under construction is low, or through long term benefits from learning spillovers from past reactor construction experience, if those spillovers are limited to similar reactors. We find that overnight construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect-Engineer (A- E). In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. (authors)

  10. Underground leaching - A method for the economic extraction of uranium from low-grade ores; Podzemnoe vyshchelachivanie - sposob ehkonomicheskogo izvlecheniya urana iz bednykh rud

    Energy Technology Data Exchange (ETDEWEB)

    Zefirov, A P [Gosudarstvennyj Komitet po Ispol' zovaniyu Atomnoj EHnergii SSSR, Moskva, Union of Soviet Socialist Republics (Russian Federation)

    1967-06-15

    The method of underground leaching of uranium ores has a number of advantages over extraction followed by processing of the ores in factories. It has been studied in two types of deposit, occurring in rock masses and sandy shales. Research techniques were worked out accordingly for the leaching of uranium from large-grained ore (-200 mm) and from layers in natural stratification. Special models were constructed permitting the simulation of underground leaching conditions. The results obtained were checked in field conditions on experimental plots and experimental underground blocks. The investigations demonstrated the practicability of the process of underground leaching of uranium from certain ores and made it possible to work out flow-sheets and routines for an industrial process, information about which is given in the paper. (author)

  11. Underground vehicle monitoring and material tracking by wireless data transmission; Untertaegige Fahrzeugueberwachung und Materialverfolgung mittels drahtloser Datenuebertragung

    Energy Technology Data Exchange (ETDEWEB)

    Huenefeld, R. [Technische Hochschule Aachen (Germany). Lehrstuhl und Inst. fuer Bergwerks- und Huettenmaschinenkunde; Kuepper, T. [XGraphic Ingenieurgesellschaft mbH, Aachen (Germany)

    2008-04-17

    Satellite-assisted navigation and position detection by GPS (Global Positioning System) are the state of the art in surface fleet management. The system cannot, of course, be used underground. With the introduction of WLAN networks, pocket PCs and WLAN Handys a technological platform, on the basis of which comparable services can be offered, has meanwhile become available also in the underground mining industry. Various applications, which were developed for the specified technological environment, are described in this contribution. They are used for communication, vehicle monitoring and position tracking, but are also suitable for complicated tasks. A typical example is the automation of monorails, in which communication with the vehicle and visualisation of the vehicle data and position are important. (orig.)

  12. Summary of nuclear power plant construction

    International Nuclear Information System (INIS)

    Tamura, Saburo

    1973-01-01

    Various conditions for the construction of nuclear power plants in Japan without natural resources were investigated. Expansion of the sites of plants, change of reactor vessels, standardization of nuclear power plants, possiblity of the reduction of construction period, approaching of nuclear power plants to consuming cities, and group construction were studied. Evaluation points were safety and economy. Previous sites of nuclear power plants were mostly on plane ground or cut and enlarge sites. Proposals for underground or offshore plants have been made. The underground plants were made at several places in Europe, and the ocean plant is now approved in U.S.A. as a plant on a man-made island. Vessels for containing nuclear reactors are the last barriers to the leakage of radioactive substance. At the initial period, the vessels were made of steel, which were surrounded by shielding material. Those were dry well type containers. Then, vessel type changed to pressure-suppression type wet containers. Now, it tends to concrete (PC or RC) type containers. There is the policy on the standardization of nuclear power plants by U.S.A.E.C. in recent remarkable activity. The merit and effect of the standardization were studied, and are presented in this paper. Cost of the construction of nuclear power plants is expensive, and interest of money is large. Then, the reduction of construction period is an important problem. The situations of plants approaching to consuming cities in various countries were studied. Idea of group construction is described. (Kato, T.)

  13. Mechanism of water inrush in tunnel construction in karst area

    Directory of Open Access Journals (Sweden)

    Liping Li

    2016-05-01

    Full Text Available With the rapid developing trend of long, large and deep construction characteristics for underground engineering in the world, China has the largest number of karst tunnels with the wide scales and great difficulties. As the hydrogeological conditions are becoming unprecedentedly complex, water inrush disaster becomes the bottleneck problem for the further development of traffic tunnels. Based on the statistical analysis of a large number of cases of water inrush in karst tunnels, influence factors of water inrush have been put forward from the view of karst hydrogeological factors and engineering disturbance of human factors. Karst hydrogeological factors include geological defect, strata dip, formation lithology, landform and underground level. Human factors of engineering disturbance include excavation and reinforcement geological prediction, monitoring and measurement of surrounding rock. It also introduces some geological disasters caused by the water inrush in tunnel excavation. In terms of the formation of water inrush channel, water inrush types are divided into geological defects inrush, non-geological defects inrush and the combination. Conclusions will be beneficial to further research on hazards control of underground construction.

  14. Blasting technologies in the underground uranium mining operations of AG/SDAG Wismut. Pt. 2

    International Nuclear Information System (INIS)

    Roschlau, H.

    1994-01-01

    This is a series of articles on selected problems: The step cut technique developed by Wismut; rock burst alarm systems; stress relief blasting to prevent rock burst; endogenous underground fires caused by self-ignition of rock strata; cooling of hot boreholes; block subsidence in slicing and caving; roadway drivage in sublevel steping with self-consolidating fill. (orig./HP) [de

  15. An integrated environment monitoring system for underground coal mines--Wireless Sensor Network subsystem with multi-parameter monitoring.

    Science.gov (United States)

    Zhang, Yu; Yang, Wei; Han, Dongsheng; Kim, Young-Il

    2014-07-21

    Environment monitoring is important for the safety of underground coal mine production, and it is also an important application of Wireless Sensor Networks (WSNs). We put forward an integrated environment monitoring system for underground coal mine, which uses the existing Cable Monitoring System (CMS) as the main body and the WSN with multi-parameter monitoring as the supplementary technique. As CMS techniques are mature, this paper mainly focuses on the WSN and the interconnection between the WSN and the CMS. In order to implement the WSN for underground coal mines, two work modes are designed: periodic inspection and interrupt service; the relevant supporting technologies, such as routing mechanism, collision avoidance, data aggregation, interconnection with the CMS, etc., are proposed and analyzed. As WSN nodes are limited in energy supply, calculation and processing power, an integrated network management scheme is designed in four aspects, i.e., topology management, location management, energy management and fault management. Experiments were carried out both in a laboratory and in a real underground coal mine. The test results indicate that the proposed integrated environment monitoring system for underground coal mines is feasible and all designs performed well as expected.

  16. An Integrated Environment Monitoring System for Underground Coal Mines—Wireless Sensor Network Subsystem with Multi-Parameter Monitoring

    Science.gov (United States)

    Zhang, Yu; Yang, Wei; Han, Dongsheng; Kim, Young-Il

    2014-01-01

    Environment monitoring is important for the safety of underground coal mine production, and it is also an important application of Wireless Sensor Networks (WSNs). We put forward an integrated environment monitoring system for underground coal mine, which uses the existing Cable Monitoring System (CMS) as the main body and the WSN with multi-parameter monitoring as the supplementary technique. As CMS techniques are mature, this paper mainly focuses on the WSN and the interconnection between the WSN and the CMS. In order to implement the WSN for underground coal mines, two work modes are designed: periodic inspection and interrupt service; the relevant supporting technologies, such as routing mechanism, collision avoidance, data aggregation, interconnection with the CMS, etc., are proposed and analyzed. As WSN nodes are limited in energy supply, calculation and processing power, an integrated network management scheme is designed in four aspects, i.e., topology management, location management, energy management and fault management. Experiments were carried out both in a laboratory and in a real underground coal mine. The test results indicate that the proposed integrated environment monitoring system for underground coal mines is feasible and all designs performed well as expected. PMID:25051037

  17. An Integrated Environment Monitoring System for Underground Coal Mines—Wireless Sensor Network Subsystem with Multi-Parameter Monitoring

    Directory of Open Access Journals (Sweden)

    Yu Zhang

    2014-07-01

    Full Text Available Environment monitoring is important for the safety of underground coal mine production, and it is also an important application of Wireless Sensor Networks (WSNs. We put forward an integrated environment monitoring system for underground coal mine, which uses the existing Cable Monitoring System (CMS as the main body and the WSN with multi-parameter monitoring as the supplementary technique. As CMS techniques are mature, this paper mainly focuses on the WSN and the interconnection between the WSN and the CMS. In order to implement the WSN for underground coal mines, two work modes are designed: periodic inspection and interrupt service; the relevant supporting technologies, such as routing mechanism, collision avoidance, data aggregation, interconnection with the CMS, etc., are proposed and analyzed. As WSN nodes are limited in energy supply, calculation and processing power, an integrated network management scheme is designed in four aspects, i.e., topology management, location management, energy management and fault management. Experiments were carried out both in a laboratory and in a real underground coal mine. The test results indicate that the proposed integrated environment monitoring system for underground coal mines is feasible and all designs performed well as expected.

  18. Evaluation of Environmental Risk Due to Metro System Construction in Jinan, China

    Directory of Open Access Journals (Sweden)

    Guo-Fu Wang

    2017-09-01

    Full Text Available Jinan is a famous spring city in China. Construction of underground metro system may block groundwater seepage, inducing the depletion risk of springs. This paper presents an assessment of the risk due to metro line construction to groundwater in Jinan City using Analytic Hierarchy Process (AHP and Geographic International System (GIS. Based on the characteristics of hydrogeology and engineering geology, the assessment model is established from the perspectives of surface index and underground index. The assessment results show that the high and very high risk levels of surface index exceed 98% in the north region; and high and very high risk levels of underground index exceed 56% in urban center and southern region. The assessment result also shows that about 14% of the urban area belongs to very high risk level; regions of high risk are 20% in urban area, 9% in Changqing County and 43% in Pingyin County. In the high risk region, metro lines R1 to R3, which are under construction, and metro lines L1 to L5, which are planned, have very high and high risk. Therefore, risk control measures are proposed to protect the groundwater seepage path to spring.

  19. Evaluation of Environmental Risk Due to Metro System Construction in Jinan, China.

    Science.gov (United States)

    Wang, Guo-Fu; Lyu, Hai-Min; Shen, Jack Shuilong; Lu, Lin-Hai; Li, Gang; Arulrajah, Arul

    2017-09-25

    Jinan is a famous spring city in China. Construction of underground metro system may block groundwater seepage, inducing the depletion risk of springs. This paper presents an assessment of the risk due to metro line construction to groundwater in Jinan City using Analytic Hierarchy Process (AHP) and Geographic International System (GIS). Based on the characteristics of hydrogeology and engineering geology, the assessment model is established from the perspectives of surface index and underground index. The assessment results show that the high and very high risk levels of surface index exceed 98% in the north region; and high and very high risk levels of underground index exceed 56% in urban center and southern region. The assessment result also shows that about 14% of the urban area belongs to very high risk level; regions of high risk are 20% in urban area, 9% in Changqing County and 43% in Pingyin County. In the high risk region, metro lines R1 to R3, which are under construction, and metro lines L1 to L5, which are planned, have very high and high risk. Therefore, risk control measures are proposed to protect the groundwater seepage path to spring.

  20. Construction of an access shaft for LEP

    CERN Document Server

    1983-01-01

    The main contract for underground work in the plain was signed end of February 1983. It foresaw a five-month preparation period before the order to start construction work could be issued. The latter was delivered on 1 September. See Annual Report 1983 p. 114

  1. Underground infrastructure damage for a Chicago scenario

    Energy Technology Data Exchange (ETDEWEB)

    Dey, Thomas N [Los Alamos National Laboratory; Bos, Rabdall J [Los Alamos National Laboratory

    2011-01-25

    Estimating effects due to an urban IND (improvised nuclear device) on underground structures and underground utilities is a challenging task. Nuclear effects tests performed at the Nevada Test Site (NTS) during the era of nuclear weapons testing provides much information on how underground military structures respond. Transferring this knowledge to answer questions about the urban civilian environment is needed to help plan responses to IND scenarios. Explosions just above the ground surface can only couple a small fraction of the blast energy into an underground shock. The various forms of nuclear radiation have limited penetration into the ground. While the shock transmitted into the ground carries only a small fraction of the blast energy, peak stresses are generally higher and peak ground displacement is lower than in the air blast. While underground military structures are often designed to resist stresses substantially higher than due to the overlying rocks and soils (overburden), civilian structures such as subways and tunnels would generally only need to resist overburden conditions with a suitable safety factor. Just as we expect the buildings themselves to channel and shield air blast above ground, basements and other underground openings as well as changes of geology will channel and shield the underground shock wave. While a weaker shock is expected in an urban environment, small displacements on very close-by faults, and more likely, soils being displaced past building foundations where utility lines enter could readily damaged or disable these services. Immediately near an explosion, the blast can 'liquefy' a saturated soil creating a quicksand-like condition for a period of time. We extrapolate the nuclear effects experience to a Chicago-based scenario. We consider the TARP (Tunnel and Reservoir Project) and subway system and the underground lifeline (electric, gas, water, etc) system and provide guidance for planning this scenario.

  2. New cosmic rays experiments in the underground laboratory of IFIN-HH from Slanic Prahova, Romania

    Science.gov (United States)

    Mitrica, Bogdan; Stanca, Denis; Brancus, Iliana; Margineanu, Romul; Blebea-Apostu, Ana-Maria; Gomoiu, Claudia; Saftoiu, Alexandra; Toma, Gabriel; Rebel, Heinigerd; Haungs, Andreas; Sima, Octavian; Gherghel-Lascu, Alexandru; Niculescu-Oglinzanu, Mihai

    2015-02-01

    Since 2006 a modern laboratory has been developed by IFIN-HH in the underground of Slanic Prahova salt ore. This work presents a short review of previous scientific activities performed in the underground laboratory, in parallel with some plans for the future. A mobile detector for cosmic muon flux measurements has been set up at IFIN-HH, Romania. The device is used to measure the muon flux on different locations at the surface and underground and it consists of two detection layers, each one including four large scintillator plates. A new rotatable detector for measurements of the directional variation of the muon flux has been designed and it is presently under preliminary tests. Built from four layers of sensitive material and using for collecting the signals and directing them to the micro PMTs a new technique, through optical fibers instead wave length shifters, it allows an easy discrimination of the moun flux on the arrival directions of muons. Combining the possibility to rotate and the directionality properties, the underground muon detector is acting like a muon tomography device, being able to scan, using cosmic muons, the rock material above the detector. In parallel new detection system based on SiPM will be also installed in the following weeks. It should be composed by four layers, each layer consisting in 4 scintillator plates what we consider in the following as a module of detection. For this purpose, first two scintillator layers, with the optical fibers positioned on perpendicular directions are put in coincidence with other two layers, 1 m distance from the first two, with similar optical fiber arrangement, thus allowing reconstructing muon trajectory. It is intended also to design and construct an experimental device for the investigation of such radio antennas and the behavior of the signal in rock salt at the Slanic salt mine in Romania. Another method to detect high energy neutrinos is based on the detection of secondary particles resulting

  3. New cosmic rays experiments in the underground laboratory of IFIN-HH from Slanic Prahova, Romania

    Energy Technology Data Exchange (ETDEWEB)

    Mitrica, Bogdan; Stanca, Denis; Brancus, Iliana; Margineanu, Romul; Blebea-Apostu, Ana-Maria; Gomoiu, Claudia; Saftoiu, Alexandra; Toma, Gabriel; Gherghel-Lascu, Alexandru; Niculescu-Oglinzanu, Mihai [Horia Hulubei National Institute of Physics and Nuclear Engineering - IFIN HH, P.O.B. MG-6, Bucharest (Romania); Rebel, Heinigerd; Haungs, Andreas [Institute of Experimental Nuclear Physics, Karlsruhe Institute of Technology-Campus North, 76021 Karlsruhe (Germany); Sima, Octavian [Department of Physics, University of Bucharest, 077125 Magurele (Romania)

    2015-02-24

    Since 2006 a modern laboratory has been developed by IFIN-HH in the underground of Slanic Prahova salt ore. This work presents a short review of previous scientific activities performed in the underground laboratory, in parallel with some plans for the future. A mobile detector for cosmic muon flux measurements has been set up at IFIN-HH, Romania. The device is used to measure the muon flux on different locations at the surface and underground and it consists of two detection layers, each one including four large scintillator plates. A new rotatable detector for measurements of the directional variation of the muon flux has been designed and it is presently under preliminary tests. Built from four layers of sensitive material and using for collecting the signals and directing them to the micro PMTs a new technique, through optical fibers instead wave length shifters, it allows an easy discrimination of the moun flux on the arrival directions of muons. Combining the possibility to rotate and the directionality properties, the underground muon detector is acting like a muon tomography device, being able to scan, using cosmic muons, the rock material above the detector. In parallel new detection system based on SiPM will be also installed in the following weeks. It should be composed by four layers, each layer consisting in 4 scintillator plates what we consider in the following as a module of detection. For this purpose, first two scintillator layers, with the optical fibers positioned on perpendicular directions are put in coincidence with other two layers, 1 m distance from the first two, with similar optical fiber arrangement, thus allowing reconstructing muon trajectory. It is intended also to design and construct an experimental device for the investigation of such radio antennas and the behavior of the signal in rock salt at the Slanic salt mine in Romania. Another method to detect high energy neutrinos is based on the detection of secondary particles resulting

  4. Control of Rock Mechanics in Underground Ore Mining

    Science.gov (United States)

    Golik, V. I.; Efremenkov, A. B.

    2017-07-01

    Performance indicators in underground mining of thick iron fields can be insufficient since geo-mechanic specifics of ore-hosting fields might be considered inadequately, as a consequence, critical deformations and even earth’s surface destruction are possible, lowering the indicators of full subsurface use, this way. The reason for it is the available approach to estimating the performance of mining according to ore excavation costs, without assessing losses of valuable components and damage to the environment. The experimental approach to the problem is based on a combination of methods to justify technical capability and performance of mining technology improvement with regard to geomechanical factors. The main idea of decisions to be taken is turning geo-materials into the condition of triaxial compression via developing the support constructions of blocked up structural rock block. The study was carried out according to an integrated approach based on the analysis of concepts, field observations, and simulation with the photo-elastic materials in conditions of North Caucasus deposits. A database containing information on the deposit can be developed with the help of industrial experiments and performance indicators of the field can be also improved using the ability of ore-hosting fields to develop support constructions, keeping the geo-mechanical stability of the system at lower cost, avoiding ore contamination at the processing stage. The proposed model is a specific one because an adjustment coefficient of natural and anthropogenic stresses is used and can be adopted for local conditions. The relation of natural to anthropogenic factors can make more precise the standards of developed, prepared and ready to excavation ore reserves relying on computational methods. It is possible to minimize critical stresses and corresponding deformations due to dividing the ore field into sectors safe from the standpoint of geo-mechanics, and using less cost

  5. Ecology and economic estimate of using of the underground excavation space

    International Nuclear Information System (INIS)

    Umnov, V.A.; Tarasov, V.F.; Tret'yakov, I.O.; Sheloumov, A.A.

    1995-01-01

    Stages of ecological and economic estimates of utilizing underground space, including evaluation of underground space resources, selection of its utilization trends and substantiation of optimal parameters for selected trends, are considered. Certain directions of possible repeated utilization of mining excavations are shown, including underground hydropower stations, underground energy storages, underground nuclear stations. Underground waste disposal is one of the most available directions in utilization of the underground space presently. Evaluation of the underground space utilization at all stages envisages complete account of all economical, social and ecological results

  6. Legal considerations for urban underground space development in Malaysia

    Directory of Open Access Journals (Sweden)

    F. Zaini

    2017-12-01

    Full Text Available In 2008, the Malaysia land code, named the National Land Code 1965 (NLC 1965, was amended to add Part Five (A to deal with the disposal of underground space. In addition, the Circular of the Director General of Lands and Mines No. 1/2008 was issued to assist the application of Part Five (A of the NLC 1965. However, the legislation is still questionable and has instigated many arguments among numerous actors. Therefore, this research was undertaken to examine legal considerations for the development of underground space. The focus is on four legal considerations, namely underground space ownership, the bundle of rights, depth, and underground space utilization. Rooted in qualitative methods, interviews were conducted with respondents involved in the development of underground space in Malaysia. The obtained data were then analyzed descriptively. The findings differentiated the rights of landowners for surface land and underground space, and their liability for damages and the depth. It was indicated that the current legislation in Malaysia, namely Part Five (A of the NLC 1965 and the Circular of the Director General of Lands and Mines No. 1/2008, is adequate to facilitate the development of underground space in terms of legal considerations. However, to further facilitate the development of underground land in the future, based on the research, four enhancements are recommended for legal considerations pertaining to the development of underground space in Malaysia. Keywords: Underground space, Legal consideration, Land right, Urban development

  7. Earthquake damage to underground facilities

    International Nuclear Information System (INIS)

    Pratt, H.R.; Stephenson, D.E.; Zandt, G.; Bouchon, M.; Hustrulid, W.A.

    1980-01-01

    In order to assess the seismic risk for an underground facility, a data base was established and analyzed to evaluate the potential for seismic disturbance. Substantial damage to underground facilities is usually the result of displacements primarily along pre-existing faults and fractures, or at the surface entrance to these facilities. Evidence of this comes from both earthquakes and large explosions. Therefore, the displacement due to earthquakes as a function of depth is important in the evaluation of the hazard to underground facilities. To evaluate potential displacements due to seismic effects of block motions along pre-existing or induced fractures, the displacement fields surrounding two types of faults were investigated. Analytical models were used to determine relative displacements of shafts and near-surface displacement of large rock masses. Numerical methods were used to determine the displacement fields associated with pure strike-slip and vertical normal faults. Results are presented as displacements for various fault lengths as a function of depth and distance. This provides input to determine potential displacements in terms of depth and distance for underground facilities, important for assessing potential sites and design parameters

  8. Results of single borehole hydraulic testing in the Mizunami Underground Research Laboratory project. Phase 2

    International Nuclear Information System (INIS)

    Daimaru, Shuji; Takeuchi, Ryuji; Onoe, Hironori; Saegusa, Hiromitsu

    2012-09-01

    This report summarize the results of the single borehole hydraulic tests of 79 sections conducted as part of the Construction phase (Phase 2) in the Mizunami Underground Research Laboratory (MIU) Project. The details of each test (test interval depth, geology, etc.) as well as the interpreted hydraulic parameters and analytical method used are presented in this report. (author)

  9. 30 CFR 57.4461 - Gasoline use restrictions underground.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Gasoline use restrictions underground. 57.4461... Prevention and Control Flammable and Combustible Liquids and Gases § 57.4461 Gasoline use restrictions underground. If gasoline is used underground to power internal combustion engines— (a) The mine shall be...

  10. Radon study in underground buildings in Chongqing, China

    International Nuclear Information System (INIS)

    Deng Wen; Jiang Rende; Liu Yigang

    1993-01-01

    Radon concentration measurements using a scintillation detector were conducted in 51 large underground buildings, which have been used as hotels, entertainment halls, restaurants, shops and factories, etc, in Chongqing, China. The results showed that the radon concentrations in these underground buildings ranged from 3.2 to 616.2 Bqm -3 . The arithmetic mean was 57.6 Bqm -3 , which was about 4 times as much as the mean radon concentration in ground buildings in Chongqing. The underground buildings with the highest radon concentrations were correlated with the high content of radium-226 in building materials, mechanical ventilation through interior circulatory ducts, underground depth of the building, and particularly, fissures in the walls. Measures of radon mitigation in underground buildings were recommended. (orig.). (3 refs., 5 tabs.)

  11. Study of high energy physics underground. Technical progress report

    International Nuclear Information System (INIS)

    1984-10-01

    The Homestake Large Area Scintillation Detector consists of 140 tons of liquid scintillator in a hollow 8 m x 8 m x 16 m box surrounding the Brookhaven 37 Cl solar neutrino detector. The experiment is located at a depth of 4850 ft. (4200 m.w.e.) in the Homestake Gold Mine. Half of the detector is currently running; the full detector will be taking data by the fall of 1984. An extensive air shower array is also currently under construction on the earth's surface above the underground detector, consisting of 100 scintillators, each 3 m 2 , covering approximately 0.8 km 2 ; the first portion of the surface array will also be providing data this fall. Together, the new Homestake detectors will be used to search for slow, massive magnetic monopoles; study the zenith angle distribution of neutrino-induced muons; search for neutrino bursts from the gravitational collapse of massive stars; measure the multiplicity and transverse momentum distributions of cosmic ray muons; and study the composition of the primary cosmic rays. The underground device and its capabilities as a monopole detector are described, followed by the surface array and the cosmic ray studies

  12. Underground ventilation remote monitoring and control system

    International Nuclear Information System (INIS)

    Strever, M.T.; Wallace, K.G. Jr.; McDaniel, K.H.

    1995-01-01

    This paper presents the design and installation of an underground ventilation remote monitoring and control system at the Waste Isolation Pilot Plant. This facility is designed to demonstrate safe underground disposal of U.S. defense generated transuranic nuclear waste. To improve the operability of the ventilation system, an underground remote monitoring and control system was designed and installed. The system consists of 15 air velocity sensors and 8 differential pressure sensors strategically located throughout the underground facility providing real-time data regarding the status of the ventilation system. In addition, a control system was installed on the main underground air regulators. The regulator control system gives indication of the regulator position and can be controlled either locally or remotely. The sensor output is displayed locally and at a central surface location through the site-wide Central Monitoring System (CMS). The CMS operator can review all sensor data and can remotely operate the main underground regulators. Furthermore, the Virtual Address Extension (VAX) network allows the ventilation engineer to retrieve real-time ventilation data on his personal computer located in his workstation. This paper describes the types of sensors selected, the installation of the instrumentation, and the initial operation of the remote monitoring system

  13. Age of underground waters: isotopes contribution

    International Nuclear Information System (INIS)

    Chery, L.; Olive, Ph.

    2006-01-01

    Does water has an age? The age of underground waters can be the duration of their underground travel between their infiltration inside the ground and their captation at a spring or a drilled well. The isotopic geochemistry comes to the support of classical geochemistry to estimate these residence times. Radio-isotopes, like tritium for young waters or carbon 14 for old waters, are used as chronometers to interpret the recharge ways, the flow mechanisms and the residence times of underground waters. Their use is presented in this article with some theoretical recalls and some examples of application. (J.S.)

  14. From LIDAR Scanning to 3d FEM Analysis for Complex Surface and Underground Excavations

    Science.gov (United States)

    Chun, K.; Kemeny, J.

    2017-12-01

    Light detection and ranging (LIDAR) has been a prevalent remote-sensing technology applied in the geological fields due to its high precision and ease to use. One of the major applications is to use the detailed geometrical information of underground structures as a basis for the generation of three-dimensional numerical model that can be used in FEM analysis. To date, however, straightforward techniques in reconstructing numerical model from the scanned data of underground structures have not been well established or tested. In this paper, we propose a comprehensive approach integrating from LIDAR scanning to finite element numerical analysis, specifically converting LIDAR 3D point clouds of object containing complex surface geometry into finite element model. This methodology has been applied to the Kartchner Caverns in Arizona for the stability analysis. Numerical simulations were performed using the finite element code ABAQUS. The results indicate that the highlights of our technologies obtained from LIDAR is effective and provide reference for other similar engineering project in practice.

  15. Estimating Limits for the Geothermal Energy Potential of Abandoned Underground Coal Mines: A Simple Methodology

    Directory of Open Access Journals (Sweden)

    Rafael Rodríguez Díez

    2014-07-01

    Full Text Available Flooded mine workings have good potential as low-enthalpy geothermal resources, which could be used for heating and cooling purposes, thus making use of the mines long after mining activity itself ceases. It would be useful to estimate the scale of the geothermal potential represented by abandoned and flooded underground mines in Europe. From a few practical considerations, a procedure has been developed for assessing the geothermal energy potential of abandoned underground coal mines, as well as for quantifying the reduction in CO2 emissions associated with using the mines instead of conventional heating/cooling technologies. On this basis the authors have been able to estimate that the geothermal energy available from underground coal mines in Europe is on the order of several thousand megawatts thermal. Although this is a gross value, it can be considered a minimum, which in itself vindicates all efforts to investigate harnessing it.

  16. [Construction of an educational technology for teaching about nursing on peripheral venipuncture].

    Science.gov (United States)

    Frota, Natasha Marques; Barros, Lívia Moreira; de Araújo, Thiago Moura; Caldini, Luana Nunes; do Nascimento, Jennara Cândido; Caetano, Joselany Afio

    2013-06-01

    The aim of the study was to describe the construction of a course on peripheral venipuncture using the Information and Communication Technologies. This is a methodological research, developed at the Federal University of Ceara from January to March 2012. The construction phases are: the analysis, design and development according to the theoretical framework of Galvis-Panqueva. In the analysis, objectives, content target audience, the study environment and technology infrastructure were delimited. During the design phase the environment interface and navigation structure of the course were evaluated. The development consisted in the materialization of all that was designed in the previous phase Once all three phases of construction of the course were conducted it was available in the Virtual Learning Environment SOLAR. The finalproduct of the course is presented as support of nursing students and consequently the training of future nurses in their care practice on peripheral venipuncture.

  17. Proximity detection system underground

    Energy Technology Data Exchange (ETDEWEB)

    Denis Kent [Mine Site Technologies (Australia)

    2008-04-15

    Mine Site Technologies (MST) with the support ACARP and Xstrata Coal NSW, as well as assistance from Centennial Coal, has developed a Proximity Detection System to proof of concept stage as per plan. The basic aim of the project was to develop a system to reduce the risk of the people coming into contact with vehicles in an uncontrolled manner (i.e. being 'run over'). The potential to extend the developed technology into other areas, such as controls for vehicle-vehicle collisions and restricting access of vehicle or people into certain zones (e.g. non FLP vehicles into Hazardous Zones/ERZ) was also assessed. The project leveraged off MST's existing Intellectual Property and experience gained with our ImPact TRACKER tagging technology, allowing the development to be fast tracked. The basic concept developed uses active RFID Tags worn by miners underground to be detected by vehicle mounted Readers. These Readers in turn provide outputs that can be used to alert a driver (e.g. by light and/or audible alarm) that a person (Tag) approaching within their vicinity. The prototype/test kit developed proved the concept and technology, the four main components being: Active RFID Tags to send out signals for detection by vehicle mounted receivers; Receiver electronics to detect RFID Tags approaching within the vicinity of the unit to create a long range detection system (60 m to 120 m); A transmitting/exciter device to enable inner detection zone (within 5 m to 20 m); and A software/hardware device to process & log incoming Tags reads and create certain outputs. Tests undertaken in the laboratory and at a number of mine sites, confirmed the technology path taken could form the basis of a reliable Proximity Detection/Alert System.

  18. Technique for Determination of Rational Boundaries in Combining Construction and Installation Processes Based on Quantitative Estimation of Technological Connections

    Science.gov (United States)

    Gusev, E. V.; Mukhametzyanov, Z. R.; Razyapov, R. V.

    2017-11-01

    The problems of the existing methods for the determination of combining and technologically interlinked construction processes and activities are considered under the modern construction conditions of various facilities. The necessity to identify common parameters that characterize the interaction nature of all the technology-related construction and installation processes and activities is shown. The research of the technologies of construction and installation processes for buildings and structures with the goal of determining a common parameter for evaluating the relationship between technologically interconnected processes and construction works are conducted. The result of this research was to identify the quantitative evaluation of interaction construction and installation processes and activities in a minimum technologically necessary volume of the previous process allowing one to plan and organize the execution of a subsequent technologically interconnected process. The quantitative evaluation is used as the basis for the calculation of the optimum range of the combination of processes and activities. The calculation method is based on the use of the graph theory. The authors applied a generic characterization parameter to reveal the technological links between construction and installation processes, and the proposed technique has adaptive properties which are key for wide use in organizational decisions forming. The article provides a written practical significance of the developed technique.

  19. The raft foundation reinforcement construction technology of Hongyun Building B tower

    Science.gov (United States)

    Liu, Yu; Yin, Suhua; Wu, Yanli; Zhao, Ying

    2017-08-01

    The foundation of Hongyun building B tower is made of raft board foundation which is 3300mm in the thickness include four kinds of reinforcement Φ32, Φ28, Φ12 and 12 steel grade two, in respective. It is researched that the raft foundation mass concrete construction technology is expatiated from temperature and cracks of the raft foundation and the temperature control and monitoring of the concrete base slab construction and concrete curing. According to the characteristics with large volume and thickness of the engineering of raft foundation, the construction of the reinforced force was calculated and the quality control measures were used to the reinforcement binding and connection, so it is success that Hongyun Building B tower raft foundation reinforced construction.

  20. Locating and defining underground goaf caused by coal mining from space-borne SAR interferometry

    Science.gov (United States)

    Yang, Zefa; Li, Zhiwei; Zhu, Jianjun; Yi, Huiwei; Feng, Guangcai; Hu, Jun; Wu, Lixin; Preusse, Alex; Wang, Yunjia; Papst, Markus

    2018-01-01

    It is crucial to locate underground goafs (i.e., mined-out areas) resulting from coal mining and define their spatial dimensions for effectively controlling the induced damages and geohazards. Traditional geophysical techniques for locating and defining underground goafs, however, are ground-based, labour-consuming and costly. This paper presents a novel space-based method for locating and defining the underground goaf caused by coal extraction using Interferometric Synthetic Aperture Radar (InSAR) techniques. As the coal mining-induced goaf is often a cuboid-shaped void and eight critical geometric parameters (i.e., length, width, height, inclined angle, azimuth angle, mining depth, and two central geodetic coordinates) are capable of locating and defining this underground space, the proposed method reduces to determine the eight geometric parameters from InSAR observations. Therefore, it first applies the Probability Integral Method (PIM), a widely used model for mining-induced deformation prediction, to construct a functional relationship between the eight geometric parameters and the InSAR-derived surface deformation. Next, the method estimates these geometric parameters from the InSAR-derived deformation observations using a hybrid simulated annealing and genetic algorithm. Finally, the proposed method was tested with both simulated and two real data sets. The results demonstrate that the estimated geometric parameters of the goafs are accurate and compatible overall, with averaged relative errors of approximately 2.1% and 8.1% being observed for the simulated and the real data experiments, respectively. Owing to the advantages of the InSAR observations, the proposed method provides a non-contact, convenient and practical method for economically locating and defining underground goafs in a large spatial area from space.