  1. Experimental study of thermal field deriving from an underground electrical power cable buried in non-homogeneous soils

    International Nuclear Information System (INIS)

    Lieto Vollaro, Roberto de; Fontana, Lucia; Vallati, Andrea

    2014-01-01

    The electrical cables ampacity mainly depends on the cable system operation temperature. To achieve a better cable utilization and reduce the conservativeness typically employed in buried cable design, an accurate evaluation of the heat dissipation through the cables and the surrounding soil is important. In the traditional method adopted by the International Electrotechnical Commission (IEC) and the Institute of Electrical and Electronics Engineers (IEEE) for the computation of the thermal resistance between an existing underground cable system and the external environment, it is still assumed that the soil is homogeneous and has uniform thermal conductivity. Numerical studies have been conducted to predict the temperature distribution around the cable for various configurations and thermal properties of the soil. The paper presents an experimental study conducted on a scale model to investigate the heat transfer of a buried cable, with different geometrical configurations and thermal properties of the soil, and to validate a simplified model proposed by the authors in 2012 for the calculation of the thermal resistance between the underground pipe or electrical cable and the ground surface, in cases where the filling of the trench is filled with layers of materials with different thermal properties. Results show that experimental data are in good agreement with the numerical ones. -- Highlights: • Heat transfer of a buried cable has been experimentally studied on a scale model. • Different configurations and thermal properties of the soil have been tested. • Authors previously proposed a simplified model and obtained numerical results. • Experimental results and numerical ones previously obtained were in accordance

  2. High Temperature Superconducting Underground Cable

    International Nuclear Information System (INIS)

    Farrell, Roger A.

    2010-01-01

    The purpose of this Project was to design, build, install and demonstrate the technical feasibility of an underground high temperature superconducting (HTS) power cable installed between two utility substations. In the first phase two HTS cables, 320 m and 30 m in length, were constructed using 1st generation BSCCO wire. The two 34.5 kV, 800 Arms, 48 MVA sections were connected together using a superconducting joint in an underground vault. In the second phase the 30 m BSCCO cable was replaced by one constructed with 2nd generation YBCO wire. 2nd generation wire is needed for commercialization because of inherent cost and performance benefits. Primary objectives of the Project were to build and operate an HTS cable system which demonstrates significant progress towards commercial progress and addresses real world utility concerns such as installation, maintenance, reliability and compatibility with the existing grid. Four key technical areas addressed were the HTS cable and terminations (where the cable connects to the grid), cryogenic refrigeration system, underground cable-to-cable joint (needed for replacement of cable sections) and cost-effective 2nd generation HTS wire. This was the worlds first installation and operation of an HTS cable underground, between two utility substations as well as the first to demonstrate a cable-to-cable joint, remote monitoring system and 2nd generation HTS.

  3. 30 CFR 75.804 - Underground high-voltage cables.

    Science.gov (United States)

    2010-07-01

    ... AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Underground High-Voltage Distribution § 75.804 Underground high-voltage cables. (a) Underground high-voltage cables used in resistance... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground high-voltage cables. 75.804 Section...

  4. Detectability of underground electrical cables junction with a ground penetrating radar: electromagnetic simulation and experimental measurements

    Science.gov (United States)

    Liu, Xiang; serhir, mohammed; kameni, abelin; lambert, marc; pichon, lionel

    2016-04-01

    For a company like Electricity De France (EDF), being able to detect accurately using non-destructive methods the position of the buried junction between two underground cables is a crucial issue. The junction is the linking part where most maintenance operations are carried out. The challenge of this work is to conduct a feasibility study to confirm or deny the relevance of Ground Penetrating Radar (GPR) to detect these buried junctions in their actual environment against clutter. Indeed, the cables are buried in inhomogeneous medium at around 80cm deep. To do this, the study is conducted in a numerical environment. We use the 3D simulation software CST MWS to model a GPR scenario. In this simulation, we place the already optimized bowtie antennas operating in the frequency band [0.5 GHz - 3 GHz] in front of wet soil (dispersive) and dry soil where the underground cable is placed at 80cm deep. We collect the amplitude and phase of the reflected waves in order to detect the contrast provoked by the geometric dimensions variation of the cable [1] (diameter of the cable is 48mm and the diameter of the junction 74mm). The use of an ultra-wideband antenna is necessary to reconcile resolution and penetration of electromagnetic waves in the medium to be characterized. We focus on the performance of the GPR method according to the characteristics of the surrounding medium in which the electric cables are buried, the polarization of the Tx and Rx antennas. The experimental measurement collected in the EDF site will be presented. The measured data are processed using the clutter reduction method based on digital filtering [2]. We aim at showing that using the developed bowtie antennas that the GPR technique is well adapted for the cable junction localization even in cluttered environment. References [1] D. J. Daniels, "Surface-Penetrating Radar", London, IEE 1996. [2] Potin, D.; Duflos, E.; Vanheeghe, P., "Landmines Ground-Penetrating Radar Signal Enhancement by Digital

  5. 47 CFR 32.2423 - Buried cable.

    Science.gov (United States)

    2010-10-01

    ... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2423 Buried cable. (a... of cleaning manholes and ducts in connection with construction work and the cost of permits and...

  6. The Thermal Regime Around Buried Submarine High-Voltage Cables

    Science.gov (United States)

    Emeana, C. J.; Dix, J.; Henstock, T.; Gernon, T.; Thompson, C.; Pilgrim, J.

    2015-12-01

    The expansion of offshore renewable energy infrastructure and the desire for "trans-continental shelf" power transmission, all require the use of submarine High Voltage (HV) cables. These cables have maximum operating surface temperatures of up to 70oC and are typically buried at depths of 1-2 m beneath the seabed, within the wide range of substrates found on the continental shelf. However, the thermal properties of near surface shelf sediments are poorly understood and this increases the uncertainty in determining the required cable current ratings, cable reliability and the potential effects on the sedimentary environments. We present temperature measurements from a 2D laboratory experiment, designed to represent a buried, submarine HV cable. We used a large (2.5 m-high) tank, filled with water-saturated ballotini and instrumented with 120 thermocouples, which measured the time-dependent 2D temperature distributions around the heat source. The experiments use a buried heat source to represent a series of realistic cable surface temperatures with the aim for identifying the thermal regimes generated within typical non-cohesive shelf sediments: coarse silt, fine sand and very coarse sand. The steady state heat flow regimes, and normalised and radial temperature distributions were assessed. Our results show that at temperatures up to 60°C above ambient, the thermal regimes are conductive for the coarse silt sediments and convective for the very coarse sand sediments even at 7°C above ambient. However, the heat flow pattern through the fine sand sediment shows a transition from conductive to convective heat flow at a temperature of approximately 20°C above ambient. These findings offer an important new understanding of the thermal regimes associated with submarine HV cables buried in different substrates and has huge impacts on cable ratings as the IEC 60287 standard only considers conductive heat flow as well as other potential near surface impacts.

  7. 47 CFR 32.2422 - Underground cable.

    Science.gov (United States)

    2010-10-01

    ... FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2422 Underground cable... manholes and ducts in connection with construction work and the cost of permits and privileges for the...

  8. Automation of Underground Cable Laying Equipment Using PLC and Hmi

    Science.gov (United States)

    Mal Kothari, Kesar; Samba, Vishweshwar; Tania, Kinza; Udayakumar, R., Dr; Karthikeyan, Ram, Dr

    2018-04-01

    Underground cable laying is an alternative for overhead cable laying of telecommunication and power transmission lines. It is becoming very popular in recent times because of some of its advantages over overhead cable laying. This type of cable laying is mostly practiced in developed countries because it is more expensive than overhead cable laying. Underground cable laying is more suitable when land is not available, and it also increases the aesthetics. This paper implements the automation on a manually operated cable pulling winch machine using programmable logic controller (PLC). Winch machines are useful in underground cable laying. The main aim of the project is to replace all the mechanical functions with electrical controls which are operated through a touch screen (HMI). The idea is that the machine should shift between parallel and series circuit automatically based on the pressure sensed instead of manually operating the solenoid valve. Traditional means of throttling the engine using lever and wire is replaced with a linear actuator. Sensors such as proximity, pressure and load sensor are used to provide the input to the system. The HMI used will display the speed, length and tension of the rope being winded. Ladder logic is used to program the PLC.

  9. Comparison of advanced high power underground cable designs

    International Nuclear Information System (INIS)

    Erb, J.; Heinz, W.; Hofmann, A.; Koefler, H.J.; Komarek, P.; Maurer, W.; Nahar, A.

    1975-09-01

    In this paper, advanced high power underground cable designs are compared in the light of available literature, of reports and information supplied by participating industries (AEG, BICC, CGE, Pirelli, Siemens), spontaneous contributions by EdF, France, BBC and Felten and Guilleaume Kabelwerke A.G., Germany, and Hitachi, Furukawa, Fujikura and Sumitomo, Japan, and earlier studies carried out at German public research centres. The study covers cables with forced cooling by oil or water, SF 6 -cables, polyethylene cables, cryoresistive and superconducting cables. (orig.) [de

  10. Trenchless Replacement of Buried Cable Lines

    Directory of Open Access Journals (Sweden)

    Hans-Joachim Bayer

    2007-01-01

    Full Text Available An enormous amount of underground electricity and telecommunication cables have been worn over the time with technical defects or need capacity increases. Thus, new lines need to be installed. In urban areas, even in smaller communities and in natural reserves, open trenching is difficult and often not permitted.In response, new patented methods of trenchless cable replacement using the HDD equipment have been developed by the TT Group. The new technology is called “Wash-over-cable-replacement” and applies specially designed drill heads, cutting around the old cable string in various configurations (completely closed, U-shape or S-shape embracing, depending to the coating type of the old cable. This special cable replacement drill head separates the cable from the surrounding adhesive soil or the sand bedding by creating a very small annular space around the cable thus enabling the pulling or dragging out of the old cable section between the start and the exit pit. After the old cable has been loosened from the surrounding soil by means of the wash over process and pulled out, the new cable can be smoothly pulled into the void using the drill rods and embedding the new cable in a rich bed of Bentonite.The wash-over drill heads are slim and have inner and outer nozzles for Bentonite and bits to handle roots, pebbles, gravel and the like. These drill heads perform very quickly (up to 3 meters per minute to effectively wash over existing cables without damaging the cable coating and prepare the ground for a fast new laying of a new cable in the existing line. Network owners also benefit from the fact that new geodetic or topographic surveys and documentations of the new cable are not necessary. Only the documents, remarks, technical codes and existing geodetic data need to be updated.The paper will outline the technological background and include several practical job examples.

  11. Laplace Synthesis Validation through Measurements on Underground Transmission Cables

    Directory of Open Access Journals (Sweden)

    Uribe-Campos Felipe Alejandro

    2014-10-01

    Full Text Available Underground cable electrical parameters ZY as well as their modal propagation characteristics are highly frequency dependent which in certain cases turns its analysis difficult. To perform electromagnetic transient studies of cables the calculation of electrical parameters is essential to obtain the waves propagation solution through the multiconductor system. At the same time this requires to solve the inverse Laplace transform on a numerical form. Although the analytic Laplace transform has an indisputable accuracy, the application of its numerical version up-to-date has not been completely accepted. A complete methodology is developed in this work to guide analyst engineers or graduate students in the calculation of electromagnetic transients of underground cable systems. Finally, to help the validation of the numerical inverse Laplace transform a scaled prototype experiment is performed in the laboratory in which a transient step-response at the remote end of an energized conductor is measured.

  12. Research on communication system of underground safety management based on leaky feeder cable

    Institute of Scientific and Technical Information of China (English)

    CHEN Jian-hong; ZHANG Tao; CHENG Yun-cai; ZHANG Han

    2007-01-01

    According to the current working status of underground safety management and production scheduling, the importance and existed problem of underground mine radio communication were summarized, and the basic principle and classification of leaky feeder cable were introduced and the characteristics of cable were analyzed specifically in depth, and the application model of radio communication system for underground mine safety management was put forward. Meanwhile, the research explanation of the system component, function and evaluation was provided. The discussion result indicates that communication system of underground mine safety management which is integrated two-way relay amplifier and other equipment has many communication functions, and underground mine mobile communication can be achieved well.

  13. Buried Object Detection Method Using Optimum Frequency Range in Extremely Shallow Underground

    Science.gov (United States)

    Sugimoto, Tsuneyoshi; Abe, Touma

    2011-07-01

    We propose a new detection method for buried objects using the optimum frequency response range of the corresponding vibration velocity. Flat speakers and a scanning laser Doppler vibrometer (SLDV) are used for noncontact acoustic imaging in the extremely shallow underground. The exploration depth depends on the sound pressure, but it is usually less than 10 cm. Styrofoam, wood (silver fir), and acrylic boards of the same size, different size styrofoam boards, a hollow toy duck, a hollow plastic container, a plastic container filled with sand, a hollow steel can and an unglazed pot are used as buried objects which are buried in sand to about 2 cm depth. The imaging procedure of buried objects using the optimum frequency range is given below. First, the standardized difference from the average vibration velocity is calculated for all scan points. Next, using this result, underground images are made using a constant frequency width to search for the frequency response range of the buried object. After choosing an approximate frequency response range, the difference between the average vibration velocity for all points and that for several points that showed a clear response is calculated for the final confirmation of the optimum frequency range. Using this optimum frequency range, we can obtain the clearest image of the buried object. From the experimental results, we confirmed the effectiveness of our proposed method. In particular, a clear image of the buried object was obtained when the SLDV image was unclear.

  14. Laplace Synthesis Validation through Measurements on Underground Transmission Cables

    OpenAIRE

    Uribe-Campos Felipe Alejandro

    2014-01-01

    Underground cable electrical parameters ZY as well as their modal propagation characteristics are highly frequency dependent which in certain cases turns its analysis difficult. To perform electromagnetic transient studies of cables the calculation of electrical parameters is essential to obtain the waves propagation solution through the multiconductor system. At the same time this requires to solve the inverse Laplace transform on a numerical form. Although the analytic Laplace transform has...

  15. Review of Detection and Monitoring Systems for Buried High Pressure Pipelines : Final Report

    NARCIS (Netherlands)

    Asadollahi Dolatabad, Saeid; Doree, Andries G.; olde Scholtenhuis, Léon Luc; Vahdatikhaki, Faridaddin

    2017-01-01

    The Netherlands has approximately two million kilometers of underground cables and pipelines. One specific type of buried infrastructure is the distribution network of hazardous material such as gas, oil, and chemicals (‘transportleiding gevaarlijke stoffen’). This network comprises 22.000

  16. High Voltage AC underground cable systems for power transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Silva, Filipe Miguel Faria da

    2016-01-01

    researching electrical engineering topics related to using underground cables for power transmission at EHV level and including the 420 kV level. The research topics were laid down by ET/AAU and Energinet.dk in the DANPAC (DANish Power systems with AC Cables) research project. The main topics are discussed...... on the basis of 39 references published by ET/AAU and Energinet.dk. Part I of the paper explains the events that lead to the research project, reactive power compensation, modelling for transient studies, including field measurements and improvements to the existing models, and temporary overvoltages due...... to resonances. Part II covers transient phenomena, harmonics in cables, system modelling for different phenomena, main and backup protections in cable-based networks, online fault detection and future trends....

  17. High Voltage AC underground cable systems for power transmission

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Silva, Filipe Miguel Faria da

    2016-01-01

    researching electrical engineering topics related to using underground cables for power transmission at EHV level and including the 420 kV level. The research topics were laid down by ET/AAU and Energinet.dk in the DANPAC (DANish Power systems with Ac Cables) research project. The main topics are discussed...... on the basis of 39 references published by ET/AAU and Energinet.dk. Part I of the paper explains the events that lead to the research project, reactive power compensation, modelling for transient studies, including field measurements and improvements to the existing models, and temporary overvoltages due...... to resonances. Part II covers transient phenomena, harmonics in cables, system modelling for different phenomena, main and backup protections in cable-based networks, online fault detection and future trends....

  18. Electric field analysis of extra high voltage (EHV) underground cables using finite element method

    DEFF Research Database (Denmark)

    Kumar, Mantosh; Bhaskar, Mahajan Sagar; Padmanaban, Sanjeevikumar

    2017-01-01

    used for the insulator due electrical, thermal or environmental stress. Most of these problems are related to the electric field stress on the insulation of the underground cables. The objective of the electric field analysis by using different numerical techniques is to find electric field stress...... electric field stress and other parameters of EHV underground cables with given boundary conditions using 2-D electric field analysis software package (IES-ELECTRO module) which is based on the finite element method (FEM).......Transmission and Distribution of electric power through underground cables is a viable alternative to overhead lines, particularly in residential or highly populated areas. The electrical stresses are consequences of regular voltages and over voltages and the thermal stresses are related to heat...

  19. Technical development of cost-efficient installation of power distribution cables under pavements. Haiden chichuka ni okeru doboku kensetsu gorika gijutsu no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Kokusho, Koji; Kataoka, Tetsuyuki; Tanaka, Yasuyuki; Yoshida, Yasuo; Ikemi, Motoyoshi; Suzuki, Koichi; Kitano, Koichi; Kobayashi, Seiichi; Kanazu, Tsutomu; Komada, Hiroya.

    1987-12-01

    Various latest technical developments were surveyed for the cost-effective installation of power distribution cables under pavements, and their applicabilities were demonstrated with the evaluation of their cost-reduction effects. Cables in conventional vinyl protection tubes could be buried only 30cm under pavements, and in such case, the cost was reduced to 51% of those of conventional methods. As the results of soil tests, excavated soil over 80% was reusable through coarse screening. Underground radar technique to explore buried pipes from the surface was detectable several pipes buried 1.5-2.0m underground, although some problems in precision were found. The improvement of reinforced concrete man-hole structures to minimize the volume of excavated soil indicated the cost reduction of nearly 20%. The application of these techniques to the installation of cables was expected to ultimately halve the total civil engineering cost. 21 refs., 130 figs., 46 tabs.

  20. Underground storage tanks

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Environmental contamination from leaking underground storage tanks poses a significant threat to human health and the environment. An estimated five to six million underground storage tanks containing hazardous substances or petroleum products are in use in the US. Originally placed underground as a fire prevention measure, these tanks have substantially reduced the damages from stored flammable liquids. However, an estimated 400,000 underground tanks are thought to be leaking now, and many more will begin to leak in the near future. Products released from these leaking tanks can threaten groundwater supplies, damage sewer lines and buried cables, poison crops, and lead to fires and explosions. As required by the Hazardous and Solid Waste Amendments (HSWA), the EPA has been developing a comprehensive regulatory program for underground storage tanks. The EPA proposed three sets of regulations pertaining to underground tanks. The first addressed technical requirements for petroleum and hazardous substance tanks, including new tank performance standards, release detection, release reporting and investigation, corrective action, and tank closure. The second proposed regulation addresses financial responsibility requirements for underground petroleum tanks. The third addressed standards for approval of state tank programs

  1. A New Contribution in Reducing Electric Field Distribution Within/Around Medium Voltage Underground Cable Terminations

    Directory of Open Access Journals (Sweden)

    S. S. Desouky

    2017-10-01

    Full Text Available Ιn medium voltage cables, the stress control layers play an important part in controlling the electric field distribution around the medium voltage underground cable terminations. Underground cable accessories, used in medium voltage cable systems, need a stress control tube in order to maintain and control the insulation level which is designed for long life times. The term “electrical stress control” refers to the cable termination analysis of optimizing the electrical stress in the area of insulation shield cutback to reduce the electrical field concentration at this point in order to reduce breakdown in the cable insulation. This paper presents the effect of some materials of different relative permittivities and geometrical regulation with the curved shape stress relief cones on the electric field distribution of cable termination. The optimization was done by comparing the results of eight materials used. Also, the effect of the change in the thickness of the stress control tube is presented. The modeling design is very important for engineers to find the optimal solution of terminator design of medium voltage cables. This paper also describes the evolution of stress control systems and their benefits. A developed program using Finite Element Method (FEM has calculated a numerical study to the stress control layering electric field distribution.

  2. Precise Detection of Buried Underground Utilities by Non-destructive Electromagnetic Survey

    International Nuclear Information System (INIS)

    Shon, Ho Woong; Lee, Seung Hee; Lee, Kang Won

    2002-01-01

    To detect the position and depth of buried underground utilities, method of Ground Penetrating Radar(GPR) survey is the most commonly used. However, the skin-depth of GPR is very shallow, and in the places where subsurface materials are not homogeneous and are compose of clays and/or salts and gravels, GPR method has limitations in application and interpretation. The aim of this study is to overcome these limitations of GPR survey. For this purpose the site where the GPR survey is unsuccessful to detect the underground big pipes is selected, and soil tests were conducted to confirm the reason why GPR method was not applicable. Non-destructive high-frequency electromagnetic (HFEM) survey was newly developed and was applied in the study area to prove the effectiveness of this new technique. The frequency ranges 2kHz∼4MHz and the skin depth is about 30m. The HFEM measures the electric field and magnetic field perpendicular to each other to get the impedance from which vertical electric resistivity distribution at the measured point can be deduced. By adopting the capacitive coupled electrodes, it can make the measuring time shorter, and can be applied to the places covered by asphalt an and/or concrete. In addition to the above mentioned advantages, noise due to high-voltage power line is much reduced by stacking the signals. As a result, the HFEM was successful in detecting the buried underground objects. Therefore this method is a promising new technique that can be applied in the lots of fields, such as geotechnical and archaeological surveys

  3. Study on dinamic behavior and least burying depth of underground protective pipe

    Energy Technology Data Exchange (ETDEWEB)

    Kataoka, Tetsuyuki; Kokusyo, Goji; Tanaka, Yukihisa; Kobayashi, Seiichi

    1988-03-30

    Effect of unit load per travel wheel on the protective pipe was studied when electricity cable distribution lines were buried in the depth less than the present standard for electric equipment, and logical burying depth was investigated. Test items were material test of the protective pipe, indoor load test, and field test at loamy ground. Impact resistance hard PVC pipe was used as the protective pipe, and its strength and elastic modulus were measured. Along with these tests, it was confirmed that there was no problem of cracking by repeated flattening or breakage by fatigue. By indoor test, it was observed that, in case of shallow burying, creap deformation was small, stress concentrate occured at the middle of axial direction, and that flattening ratio was seriously affected by the method of backfilling. Field test was conducted by applying the static load of a 20 ton dump truck, and the deformation, stress, and subsidence of the protective pipe, were measured. As the conclusion of those experiments, it was found that burying of protective pipe in the depth of not less than 30 cm is allowable, as long as sufficient bakfilling is made. (14 figs, 3 tabs, 3 refs)

  4. Online Location of Faults on AC Cables in Underground Transmission Systems

    DEFF Research Database (Denmark)

    Jensen, Christian Flytkjær

    under fault conditions well, but the accuracy of the calculated impedance is low for fault location purposes. The neural networks can therefore not be trained and no impedance-based fault location method can be used for crossbonded cables or hybrid lines. The use of travelling wave-based methods...... connection to verify the proposed method. Faults, at reduced a voltage are artificially applied in the cable system and the transient response is measured at two terminals at the cable’s ends. The measurements are time-synchronised and it is found that a very accurate estimation of the fault location can......A transmission grid is normally laid out as an almost pure overhead line (OHL) network. The introduction of transmission voltage level XLPE cables and the increasing interest in the environmental impact of OHL has resulted in an increasing interest in the use of underground cables on transmission...

  5. Innovating Technological Process for Expanding the Service Life of Underground Power Cables

    Directory of Open Access Journals (Sweden)

    Tabacaru V.

    2016-08-01

    Full Text Available As a public power distribution operator on low voltage (023/0.4 kV, medium voltage (6 and 20 kV, and high voltage (110 kV in the territory of Galati County, SDEE Galati serves approximately 240,000 consumers (captive and eligible, domestic and non-domestic For this purpose, in the field of medium voltage underground distribution lines, SDEE Galati manages and operates a volume of approx. 500 km UDL/6kV circuit and approximately 630 km UDL/20 kV circuit. Many of these cables which are still in operation, were manufactured with materials and on the technological level of the ’60s,’70s and ‘80s decades and have reached the end of their service life. Evidence does and incident statistics from these networks in which, every year, one of the "tips" is the medium voltage cables damaged "technical wear" normal operating conditions. The current paper will present the main features of an innovating technological process called SPR (Sustained Pressure Rejuvenation, designed for on-site refurbishing of underground power cable insulation medium and high voltage. The process offers a viable alternative that has proven, over the 25 years of application initially on the American content and now on the worldwide, substantially more cost effective than replacing cables. The paper does not propose detailed presentation of the technological process, but to inform the family of energetics NPS about the existence and the benefits of applying this new technological process to the old cable medium and high voltage.

  6. BC Hydro's integrated approach on replacing underground feeder cables

    Energy Technology Data Exchange (ETDEWEB)

    Tarampi, D. [BC Hydro, Burnaby, BC (Canada)

    2008-07-01

    BC Hydro's integrated approach on replacing underground feeder cables was discussed. The feeder cables were all in ducts encased in concrete and splices were identified in concrete manholes. The feeder cables averaged 35 to 40 failures per year, with a large majority of failures occurring in manholes or near terminations. The age of the cables was not known. A graphical representation of a condition assessment was presented with reference to an electrical test, metallurgical test, hardness test, and dye penetrating test. Prioritization steps were also listed, including a condition index and replacement threshold. Steps in prioritizing the condition index included determining the insulation index based on electrical test results; determining the manhole condition based on metallurgical test results; determining the customer importance factor and feeder load factor; and calculating the overall condition index based on the indices. A process flowchart was also illustrated. A replacement strategy was then discussed and a cost comparison of two options was described. Option 1 was to replace only the unjacketed cables while option two involved selective replacement. tabs., figs.

  7. Comparison of Distributed Acoustic Sensing (DAS) from Fiber-Optic Cable to Three Component Geophones in an Underground Mine

    Science.gov (United States)

    Speece, M. A.; Nesladek, N. J.; Kammerer, C.; Maclaughlin, M.; Wang, H. F.; Lord, N. E.

    2017-12-01

    We conducted experiments in the Underground Education Mining Center on the Montana Tech campus, Butte, Montana, to make a direct comparison between Digital Acoustic Sensing (DAS) and three-component geophones in a mining setting. The sources used for this project where a vertical sledgehammer, oriented shear sledgehammer, and blasting caps set off in both unstemmed and stemmed drillholes. Three-component Geospace 20DM geophones were compared with three different types of fiber-optic cable: (1) Brugg strain, (2) Brugg temperature, and (3) Optical Cable Corporation strain. We attached geophones to the underground mine walls and on the ground surface above the mine. We attached fiber-optic cables to the mine walls and placed fiber-optic cable in boreholes drilled through an underground pillar. In addition, we placed fiber-optic cables in a shallow trench at the surface of the mine. We converted the DAS recordings from strain rate to strain prior to comparison with the geophone data. The setup of the DAS system for this project led to a previously unknown triggering problem that compromised the early samples of the DAS traces often including the first-break times on the DAS records. Geophones clearly recorded the explosives; however, the large amount of energy and its close distance from the fiber-optic cables seemed to compromise the entire fiber loop. The underground hammer sources produced a rough match between the DAS records and the geophone records. However, the sources on the surface of the mine, specifically the sources oriented inline with the fiber-optic cables, produced a close match between the fiber-optic traces and the geophone traces. All three types of fiber-optic cable that were in the mine produced similar results, and one type did not clearly outperform the others. Instead, the coupling of the cable to rock appears to be the most important factor determining DAS data quality. Moreover, we observed the importance of coupling in the boreholes, where

  8. Review of Detection and Monitoring Systems for Buried High Pressure Pipelines: Final Report

    OpenAIRE

    Asadollahi Dolatabad, Saeid; Doree, Andries G.; olde Scholtenhuis, Léon Luc; Vahdatikhaki, Faridaddin

    2017-01-01

    The Netherlands has approximately two million kilometers of underground cables and pipelines. One specific type of buried infrastructure is the distribution network of hazardous material such as gas, oil, and chemicals (‘transportleiding gevaarlijke stoffen’). This network comprises 22.000 kilometers of high-pressure transportation pipelines. Because they are located under the ground, these pipelines are subject to excavation damages. Incidents in them Belgian Gellingen (2004) and German Ludw...

  9. Quality frontier of electricity distribution: Supply security, best practices, and underground cabling in Finland

    International Nuclear Information System (INIS)

    Saastamoinen, Antti; Kuosmanen, Timo

    2016-01-01

    Electricity distribution is a prime example of local monopoly. In most countries, the costs of electricity distribution operators are regulated by the government. However, the cost regulation may create adverse incentives to compromise the quality of service. To avoid this, cost regulation is often amended with quality incentives. This study applies theory and methods of productivity analysis to model the frontier of service quality. A semi-nonparametric estimation method is developed, which does not assume any particular functional form for the quality frontier, but can accommodate stochastic noise and heteroscedasticity. The empirical part of our paper examines how underground cabling and location affect the interruption costs. As expected, higher proportion of underground cabling decreases the level of interruption costs. The effects of cabling and location on the variance of performance are also considered. Especially the location is found to be a significant source of heteroscedasticity in the interruption costs. Finally, the proposed quality frontier benchmark is compared to the current practice of Finnish regulation system. The proposed quality frontier is found to provide more meaningful and stable basis for setting quality targets than the average practice benchmarks currently in use. - Highlights: • Cost regulation may create adverse incentives to lower the service quality. • We model the frontier of service quality using a semi-nonparametric approach. • Our nonparametric frontier accounts for stochastic noise and heteroscedasticity. • We estimate how underground cabling and location affect interruption costs. • We compare our quality frontier with the current quality regulation in Finland.

  10. Distinguishing Buried Objects in Extremely Shallow Underground by Frequency Response Using Scanning Laser Doppler Vibrometer

    Science.gov (United States)

    Touma Abe,; Tsuneyoshi Sugimoto,

    2010-07-01

    A sound wave vibration using a scanning laser Doppler vibrometer are used as a method of exploring and imaging an extremely shallow underground. Flat speakers are used as a vibration source. We propose a method of distinguishing a buried object using a response range of a frequencies corresponding to a vibration velocities. Buried objects (plastic containers, a hollow steel can, an unglazed pot, and a stone) are distinguished using a response range of frequencies. Standardization and brightness imaging are used as methods of discrimination. As a result, it was found that the buried objects show different response ranges of frequencies. From the experimental results, we confirmed the effectiveness of our proposed method.

  11. New piercing for insulated cables in underground networks; Novos conectores compactos perfurantes ('piercings') para cabos isoldados em redes subterraneas

    Energy Technology Data Exchange (ETDEWEB)

    Moreno, Fernando; Corral, Horacio [Tradis, SP (Brazil). E-mail: tradis@mandic.com.br

    1999-07-01

    This work presents a tap and transition connection in low voltage protected underground cables. This connection allows tapping for clients or branchings from a main energized cables. The compact connectors range various types of insulated cables protected and under grounded in a simple way. The work analysed the advantages of using two components polyurethane resins for the tapping protection and insulation restoring.

  12. Numerical simulation of seismic performance of the underground structure buried in the dense saturated sand

    International Nuclear Information System (INIS)

    Kawai, Tadashi

    2006-01-01

    The applicability of the advanced earthquake resistant performance verification method on reinforced concrete underground structures developed by CRIEPI was investigated for the structures which buried in the dry sand. For the advancement of the method in practical use, the applicability to the structures buried in the saturated ground is expected to be verified. In this study the applicability of the effective stress based soil modeling method in numerical analysis, which was proposed through the modification of the formerly developed model by CRIEPI, was verified through the non-linear dynamic numerical simulations of the large centrifuge tests conducted by using a model comprised of fully saturated sand and a aluminium duct type structure specially prepared for the measurement of the load acting on the structure surface with the soil-structure interaction. The magnitudes of the simulated loads and the resultant deformations of the structure were almost same as those of experiments. As a result it is confirmed that the performance verification method is useful for the structures buried in the saturated ground with using the proposed effective stress based ground modeling method. (author)

  13. Subsea Cable Tracking by Autonomous Underwater Vehicle with Magnetic Sensing Guidance.

    Science.gov (United States)

    Xiang, Xianbo; Yu, Caoyang; Niu, Zemin; Zhang, Qin

    2016-08-20

    The changes of the seabed environment caused by a natural disaster or human activities dramatically affect the life span of the subsea buried cable. It is essential to track the cable route in order to inspect the condition of the buried cable and protect its surviving seabed environment. The magnetic sensor is instrumental in guiding the remotely-operated vehicle (ROV) to track and inspect the buried cable underseas. In this paper, a novel framework integrating the underwater cable localization method with the magnetic guidance and control algorithm is proposed, in order to enable the automatic cable tracking by a three-degrees-of-freedom (3-DOF) under-actuated autonomous underwater vehicle (AUV) without human beings in the loop. The work relies on the passive magnetic sensing method to localize the subsea cable by using two tri-axial magnetometers, and a new analytic formulation is presented to compute the heading deviation, horizontal offset and buried depth of the cable. With the magnetic localization, the cable tracking and inspection mission is elaborately constructed as a straight-line path following control problem in the horizontal plane. A dedicated magnetic line-of-sight (LOS) guidance is built based on the relative geometric relationship between the vehicle and the cable, and the feedback linearizing technique is adopted to design a simplified cable tracking controller considering the side-slip effects, such that the under-actuated vehicle is able to move towards the subsea cable and then inspect its buried environment, which further guides the environmental protection of the cable by setting prohibited fishing/anchoring zones and increasing the buried depth. Finally, numerical simulation results show the effectiveness of the proposed magnetic guidance and control algorithm on the envisioned subsea cable tracking and the potential protection of the seabed environment along the cable route.

  14. 30 CFR 77.601 - Trailing cables or portable cables; temporary splices.

    Science.gov (United States)

    2010-07-01

    ... LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Trailing Cables § 77.601 Trailing cables or portable cables; temporary... or splices that heat or spark under load shall not be used. ...

  15. Fault location in underground cables using ANFIS nets and discrete wavelet transform

    Directory of Open Access Journals (Sweden)

    Shimaa Barakat

    2014-12-01

    Full Text Available This paper presents an accurate algorithm for locating faults in a medium voltage underground power cable using a combination of Adaptive Network-Based Fuzzy Inference System (ANFIS and discrete wavelet transform (DWT. The proposed method uses five ANFIS networks and consists of 2 stages, including fault type classification and exact fault location. In the first part, an ANFIS is used to determine the fault type, applying four inputs, i.e., the maximum detailed energy of three phase and zero sequence currents. Other four ANFIS networks are utilized to pinpoint the faults (one for each fault type. Four inputs, i.e., the maximum detailed energy of three phase and zero sequence currents, are used to train the neuro-fuzzy inference systems in order to accurately locate the faults on the cable. The proposed method is evaluated under different fault conditions such as different fault locations, different fault inception angles and different fault resistances.

  16. Switching Restrikes in HVAC Cable Lines and Hybrid HVAC Cable/OHL Lines

    DEFF Research Database (Denmark)

    da Silva, Filipe Miguel Faria; Bak, Claus Leth; Balle Holst, Per

    2011-01-01

    The disconnection of HV underground cables may, if unsuccessful, originate a restrike in the circuit breaker, leading to high overvoltages, and potentially damaging the cable and near equipment. Due to the cable high capacitance and low resistance the voltage damping is slow, resulting, half a cy...

  17. 7 CFR 1755.505 - Buried services.

    Science.gov (United States)

    2010-01-01

    ... using the recommendations in RUS Bulletin 1751F-640, “Design of Buried Plant—Physical Considerations... water, oil, sewer) and structures 4 2 [50.8] Wires or cables of another communications system 2 [50.8] 1... wire or cable size and type of surface shall be in accordance with the manufacturer's recommendation...

  18. Development of Integrated Assessment System for Underground Power Cable Performance: A Case Study

    Science.gov (United States)

    Turan, Faiz Mohd; Johan, Kartina; Soliha Sahimi, Nur; Nor, Nik Hisyamudin Muhd

    2017-08-01

    of studies involve Company M which is an agriculture industries which has higher usage on their own underground power cable. Moreover, in the past history the company experienced electrical power failure and this studies and findings will definitely come in hand to provide them necessary help and benefits.

  19. Water-Tree Modelling and Detection for Underground Cables

    Science.gov (United States)

    Chen, Qi

    In recent years, aging infrastructure has become a major concern for the power industry. Since its inception in early 20th century, the electrical system has been the cornerstone of an industrial society. Stable and uninterrupted delivery of electrical power is now a base necessity for the modern world. As the times march-on, however, the electrical infrastructure ages and there is the inevitable need to renew and replace the existing system. Unfortunately, due to time and financial constraints, many electrical systems today are forced to operate beyond their original design and power utilities must find ways to prolong the lifespan of older equipment. Thus, the concept of preventative maintenance arises. Preventative maintenance allows old equipment to operate longer and at better efficiency, but in order to implement preventative maintenance, the operators must know minute details of the electrical system, especially some of the harder to assess issues such water-tree. Water-tree induced insulation degradation is a problem typically associated with older cable systems. It is a very high impedance phenomenon and it is difficult to detect using traditional methods such as Tan-Delta or Partial Discharge. The proposed dissertation studies water-tree development in underground cables, potential methods to detect water-tree location and water-tree severity estimation. The dissertation begins by developing mathematical models of water-tree using finite element analysis. The method focuses on surface-originated vented tree, the most prominent type of water-tree fault in the field. Using the standard operation parameters of North American electrical systems, the water-tree boundary conditions are defined. By applying finite element analysis technique, the complex water-tree structure is broken down to homogeneous components. The result is a generalized representation of water-tree capacitance at different stages of development. The result from the finite element analysis

  20. Inferring the most probable maps of underground utilities using Bayesian mapping model

    Science.gov (United States)

    Bilal, Muhammad; Khan, Wasiq; Muggleton, Jennifer; Rustighi, Emiliano; Jenks, Hugo; Pennock, Steve R.; Atkins, Phil R.; Cohn, Anthony

    2018-03-01

    Mapping the Underworld (MTU), a major initiative in the UK, is focused on addressing social, environmental and economic consequences raised from the inability to locate buried underground utilities (such as pipes and cables) by developing a multi-sensor mobile device. The aim of MTU device is to locate different types of buried assets in real time with the use of automated data processing techniques and statutory records. The statutory records, even though typically being inaccurate and incomplete, provide useful prior information on what is buried under the ground and where. However, the integration of information from multiple sensors (raw data) with these qualitative maps and their visualization is challenging and requires the implementation of robust machine learning/data fusion approaches. An approach for automated creation of revised maps was developed as a Bayesian Mapping model in this paper by integrating the knowledge extracted from sensors raw data and available statutory records. The combination of statutory records with the hypotheses from sensors was for initial estimation of what might be found underground and roughly where. The maps were (re)constructed using automated image segmentation techniques for hypotheses extraction and Bayesian classification techniques for segment-manhole connections. The model consisting of image segmentation algorithm and various Bayesian classification techniques (segment recognition and expectation maximization (EM) algorithm) provided robust performance on various simulated as well as real sites in terms of predicting linear/non-linear segments and constructing refined 2D/3D maps.

  1. Models for electromagnetic coupling of lightning onto multiconductor cables in underground cavities

    Science.gov (United States)

    Higgins, Matthew Benjamin

    This dissertation documents the measurements, analytical modeling, and numerical modeling of electromagnetic transfer functions to quantify the ability of cloud-to-ground lightning strokes (including horizontal arc-channel components) to couple electromagnetic energy onto multiconductor cables in an underground cavity. Measurements were performed at the Sago coal mine located near Buckhannon, WV. These transfer functions, coupled with mathematical representations of lightning strokes, are then used to predict electric fields within the mine and induced voltages on a cable that was left abandoned in the sealed area of the Sago mine. If voltages reached high enough levels, electrical arcing could have occurred from the abandoned cable. Electrical arcing is known to be an effective ignition source for explosive gas mixtures. Two coupling mechanisms were measured: direct and indirect drive. Direct coupling results from the injection or induction of lightning current onto metallic conductors such as the conveyors, rails, trolley communications cable, and AC power shields that connect from the outside of the mine to locations deep within the mine. Indirect coupling results from electromagnetic field propagation through the earth as a result of a cloud-to-ground lightning stroke or a long, low-altitude horizontal current channel from a cloud-to-ground stroke. Unlike direct coupling, indirect coupling does not require metallic conductors in a continuous path from the surface to areas internal to the mine. Results from the indirect coupling measurements and analysis are of great concern. The field measurements, modeling, and analysis indicate that significant energy can be coupled directly into the sealed area of the mine. Due to the relatively low frequency content of lightning (extremely well with analytical and computational models developed for the Sago site which take into account measured soil properties.

  2. Simplified frequency-dependent formulae for series-impedance matrices of single-core HVAC cables

    DEFF Research Database (Denmark)

    Silva, Filipe Miguel Faria da

    2015-01-01

    The installation of HVAC underground cables became more common in recent years, a trend expected to continue in the future. Underground cables are more complex than overhead lines and the calculation of their resistance and reactance can be challenging and time consuming for frequencies that are ......The installation of HVAC underground cables became more common in recent years, a trend expected to continue in the future. Underground cables are more complex than overhead lines and the calculation of their resistance and reactance can be challenging and time consuming for frequencies...

  3. Lightning in hybrid cable-overhead lines and consequent transient overvoltages

    DEFF Research Database (Denmark)

    Silva, Filipe Miguel Faria da; Schultz Pedersen, Kasper; Bak, Claus Leth

    2017-01-01

    Whereas lines that consist entirely of underground cable are naturally protected from lightning, the phenomenon must be considered for lines that are a mix of overhead lines and underground cables. The difference between overhead lines and underground cables wave impedances may lead to transient ...... conductor and for hits on the earth wire, with and without back flashover. For the most common situation, stroke on the earth wire, it is demonstrated that the cable’s ground propagation mode is dominant, reducing the impact of the reflections....

  4. New method for the detection and monitoring of subsea power cable

    Science.gov (United States)

    Held, Philipp; Schneider, Jens; Feldens, Peter; Wilken, Dennis

    2016-04-01

    Marine renewable energy farms, no matter what kind of, have in common that they need a connection with the onshore power grid. Thus, not only their offshore generation facilities could have impacts on the surrounding environment, but also associated submarine power cables. These cables have to be buried in the seabed - at least in coastal heavy shipping environments - for safety reasons. Cable laying disturbs the local seafloor and the sub-bottom. Refillment of dredged sediments are expected softer than the original material and could be washed away by currents. Therefore, buried cables have to be repeatedly monitored to ensure their burial depth. This study presents a new method for efficient cable detection. A parametric echosounder system using 15 kHz as secondary frequency was adapted to investigate the angular response of sub-bottom backscatter strength of layered mud and to introduce a new method for enhanced acoustic detection of buried targets. Adaptations to achieve both vertical (0°) and non-vertical inclination of incident sound on the seabed (1-15°, 30°, 45°, and 60°) comprise mechanical tilting of the acoustic transducer and electronic beam steering. A sample data set was acquired at a study site at 18 m water depth and a flat and muddy seafloor. At this site, a 0.1 m diameter power cable is buried 1-2 m below the sea floor. Surveying the cable with vertical incidence revealed that the buried cable can hardly be discriminated against the backscatter strength of the layered mud. However, the backscatter strength of layered mud was found to strongly decrease at >3±0.5° incidence and the layered mud echo pattern vanished beyond 5°. As a consequence the visual recognition of the cable echo in acoustic images improves for higher incidence angles of 15°, 30°, 45°, and 60°. Data analysis support this visual impression. The size of the cable echo pattern was found to linearly increase with incidence, whereas the signal-to-noise ratio peaks at about

  5. A simple computational method for predicting magnetic field in the vicinity of a three-phase underground cable with a fluid-filled steel-pipe enclosure

    International Nuclear Information System (INIS)

    Xu, X.B.; Yang, X.M.

    1994-01-01

    This paper presents a simple computational method for predicting the magnetic field above ground, generated by an underground three-phase pipe-type cable. In the computation, an approximation is made to simplify the problem a Fourier series technique and an iterative procedure are employed to handle the nonlinear B-H characteristic of the steel pipe. To validate the computational method, measurements were made and the numerical results are compared with the measurement data. Also, data of magnetic fields generated by the pipe type cable are compared with those due to the cable in absence of the pipe. The advantages and disadvantages of this simple method are discussed

  6. Electromagnetic transients in power cables

    CERN Document Server

    da Silva, Filipe Faria

    2013-01-01

    From the more basic concepts to the most advanced ones where long and laborious simulation models are required, Electromagnetic Transients in Power Cables provides a thorough insight into the study of electromagnetic transients and underground power cables. Explanations and demonstrations of different electromagnetic transient phenomena are provided, from simple lumped-parameter circuits to complex cable-based high voltage networks, as well as instructions on how to model the cables.Supported throughout by illustrations, circuit diagrams and simulation results, each chapter contains exercises,

  7. Cable Diagnostic Focused Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Hartlein, R.A.; Hampton, R.N.

    2010-12-30

    This report summarizes an extensive effort made to understand how to effectively use the various diagnostic technologies to establish the condition of medium voltage underground cable circuits. These circuits make up an extensive portion of the electric delivery infrastructure in the United States. Much of this infrastructure is old and experiencing unacceptable failure rates. By deploying efficient diagnostic testing programs, electric utilities can replace or repair circuits that are about to fail, providing an optimal approach to improving electric system reliability. This is an intrinsically complex topic. Underground cable systems are not homogeneous. Cable circuits often contain multiple branches with different cable designs and a range of insulation materials. In addition, each insulation material ages differently as a function of time, temperature and operating environment. To complicate matters further, there are a wide variety of diagnostic technologies available for assessing the condition of cable circuits with a diversity of claims about the effectiveness of each approach. As a result, the benefits of deploying cable diagnostic testing programs have been difficult to establish, leading many utilities to avoid the their use altogether. This project was designed to help address these issues. The information provided is the result of a collaborative effort between Georgia Tech NEETRAC staff, Georgia Tech academic faculty, electric utility industry participants, as well as cable system diagnostic testing service providers and test equipment providers. Report topics include: •How cable systems age and fail, •The various technologies available for detecting potential failure sites, •The advantages and disadvantages of different diagnostic technologies, •Different approaches for utilities to employ cable system diagnostics. The primary deliverables of this project are this report, a Cable Diagnostic Handbook (a subset of this report) and an online

  8. Underground cables as an alternative to overhead lines. A comparison of economic and technical aspects of voltages over 22 kV

    Energy Technology Data Exchange (ETDEWEB)

    Trohjell, J.E.; Vognild, I.H.

    1994-07-11

    The report presents technical and economical aspects of underground cables compared to overhead lines in Norway in high voltage transmission systems above 22 kV. The economical comparison between the two options includes capital costs of installation (investment costs), maintenance costs and costs of electrical losses. The main technical issues discussed are reliability and flexibility. 35 refs., 23 figs., 29 tabs.

  9. Stray current interaction in the system of two extensive underground conductors

    International Nuclear Information System (INIS)

    Machczynski, W.

    1993-01-01

    The important problem, technically, is to evaluate the harmful effects that an electrified railway has on nearby earth-return circuits (cables, pipelines). This paper considers the effects of a DC-electrified railway system on two extensive metal conductors buried in parallel in the vicinity of the tracks. The interaction between currents flowing in both underground conductors is taken into account, whereas the reaction of the conductors' currents on the track current is disregarded. The analysis given is applicable to any DC railway system in which tracks may be represented by a single earth return circuit with current energization. It is assumed in the paper that the system considered is linear and that the earth is homogeneous. The technical application of the method is illustrated by an example of computer simulation

  10. 30 CFR 75.601 - Short circuit protection of trailing cables.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Short circuit protection of trailing cables. 75... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.601 Short circuit protection of trailing cables. [Statutory Provisions] Short circuit protection for trailing cables...

  11. In situ vitrification of buried waste sites

    International Nuclear Information System (INIS)

    Shade, J.W.; Thompson, L.E.; Kindle, C.H.

    1991-04-01

    In situ vitrification (ISV) is a remedial technology initially developed to treat soils contaminated with a variety of organics, heavy metals, and/or radioactive materials. Recent tests have indicated the feasibility of applying the process to buried wastes including containers, combustibles, and buried metals. In addition, ISV is being considered for application to the emplacement of barriers and to the vitrification of underground tanks. This report provides a review of some of the recent experiences of applying ISV in engineering-scale and pilot-scale tests to wastes containing organics, the Environmental Protection Agency (EPA) Toxic metals buried in sealed containers, and buried ferrous metals, with emphasis on the characteristics of the vitrified product and adjacent soil. 9 refs., 2 figs., 3 tabs

  12. Simplified formulae for the estimation of the positive-sequence resistance and reactance of three-phase cables for different frequencies

    DEFF Research Database (Denmark)

    Silva, Filipe Miguel Faria da

    2015-01-01

    The installation of HVAC underground cables became more common in recent years, a trend expected to continue in the future. Underground cables are more complex than overhead lines and the calculation of their resistance and reactance can be challenging and time consuming for frequencies that are ......The installation of HVAC underground cables became more common in recent years, a trend expected to continue in the future. Underground cables are more complex than overhead lines and the calculation of their resistance and reactance can be challenging and time consuming for frequencies...... that are not power frequency. Software packages capable of performing exact calculations of these two parameters exist, but simple equations able to estimate the reactance and resistance of an underground cable for the frequencies associated to a transient or a resonance phenomenon would be helpful. This paper...

  13. 30 CFR 77.600 - Trailing cables; short-circuit protection; disconnecting devices.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables; short-circuit protection... AREAS OF UNDERGROUND COAL MINES Trailing Cables § 77.600 Trailing cables; short-circuit protection; disconnecting devices. Short-circuit protection for trailing cables shall be provided by an automatic circuit...

  14. External electromagnetic transient sources: analysis of its effect in underground power cables; Fuentes transitorias electromagneticas externas: analisis de su efecto en los cables de potencia subterraneos

    Energy Technology Data Exchange (ETDEWEB)

    Escamilla Paz, Antonio

    2009-07-01

    In most of the electrical power systems that operate at present, the subterranean cables are only a complement. The cost of these cables is generally higher than the one of the aerial power lines, thus its use is restricted only to those areas where the construction of the aerial power lines is not feasible. It is estimated that for voltages lower than 110 kV this cost is up to seven times greater than the one of an aerial power line and for voltages higher than 380 kV it can be up to twenty times greater. Nevertheless, important reasons exist to construct a subterranean cable system such as: a) the fast growth of the urban centers and the industrial zones, which brings about restrictions of the rights of way for the construction of aerial power lines, b) the crossing of large water bodies, c) the congestion of aerial power lines near the generating substations or power plants, d) the crossing of air lines and e) the laws and the regulations, to mention some of them. The importance of the underground transmission systems of high and extra high voltage will be increased in the medium and the long term, therefore, it is considered that the effects of the external phenomena in these systems, like the inductions produced by the electromagnetic transient sources, will be more severe. In this research work the atmospheric discharges are defined as the external electromagnetic transient sources. The large dimension cables such as the power cables, behave as large collectors of the interferences produced by the atmospheric discharges, which can bring about damages in the components of a system. In order to avoid the damages and to increase the reliability of the subterranean cable systems it is necessary to use protective devices and appropriate insulation levels, mainly. If the phenomenon and the behavior of the system are properly represented, it is possible to more accurately determine the characteristics that the equipment must have to resist the over voltages and the

  15. Applying Diagnostics to Enhance Cable System Reliability (Cable Diagnostic Focused Initiative, Phase II)

    Energy Technology Data Exchange (ETDEWEB)

    Hartlein, Rick [Georgia Tech Research Corporation (GTRC), Atlanta, GA (United States). National Electric Energy Testing, Research and Applications Center (NEETRAC); Hampton, Nigel [Georgia Tech Research Corporation (GTRC), Atlanta, GA (United States). National Electric Energy Testing, Research and Applications Center (NEETRAC); Perkel, Josh [Georgia Tech Research Corporation (GTRC), Atlanta, GA (United States). National Electric Energy Testing, Research and Applications Center (NEETRAC); Hernandez, JC [Univ. de Los Andes, Merida (Venezuela); Elledge, Stacy [Georgia Tech Research Corporation (GTRC), Atlanta, GA (United States). National Electric Energy Testing, Research and Applications Center (NEETRAC); del Valle, Yamille [Georgia Tech Research Corporation (GTRC), Atlanta, GA (United States). National Electric Energy Testing, Research and Applications Center (NEETRAC); Grimaldo, Jose [Georgia Inst. of Technology, Atlanta, GA (United States). School of Electrical and Computer Engineering; Deku, Kodzo [Georgia Inst. of Technology, Atlanta, GA (United States). George W. Woodruff School of Mechanical Engineering

    2016-02-01

    The Cable Diagnostic Focused Initiative (CDFI) played a significant and powerful role in clarifying the concerns and understanding the benefits of performing diagnostic tests on underground power cable systems. This project focused on the medium and high voltage cable systems used in utility transmission and distribution (T&D) systems. While many of the analysis techniques and interpretations are applicable to diagnostics and cable systems outside of T&D, areas such as generating stations (nuclear, coal, wind, etc.) and other industrial environments were not the focus. Many large utilities in North America now deploy diagnostics or have changed their diagnostic testing approach as a result of this project. Previous to the CDFI, different diagnostic technology providers individually promoted their approach as the “the best” or “the only” means of detecting cable system defects.

  16. Chemical oxidation of cable insulating oil contaminated soil

    NARCIS (Netherlands)

    Jinlan Xu,; Pancras, T.; Grotenhuis, J.T.C.

    2011-01-01

    Leaking cable insulating oil is a common source of soil contamination of high-voltage underground electricity cables in many European countries. In situ remediation of these contaminations is very difficult, due to the nature of the contamination and the high concentrations present. Chemical

  17. Ground Penetrating Radar Imaging of Buried Metallic Objects

    DEFF Research Database (Denmark)

    Polat, A. Burak; Meincke, Peter

    2001-01-01

    During the past decade there has been considerable research on ground penetrating radar (GPR) tomography for detecting objects such as pipes, cables, mines and barrels buried under the surface of the Earth. While the earlier researches were all based on the assumption of a homogeneous background...

  18. Vitrification of underground storage tanks: Technology development, regulatory issues, and cost analysis

    International Nuclear Information System (INIS)

    Tixier, J.S.; Corathers, L.A.; Anderson, L.D.

    1992-03-01

    In situ vitrification (ISV), developed by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE), is a thermal treatment process for the remediation of hazardous, radioactive, or mixed waste sites. The process has been broadly patented both domestically and abroad. Since the inception of ISV in 1980, developmental activities have been focused on applications to contaminated soils, and more recently the potential for application to buried wastes and underground structures (tanks). Research performed to date on the more advanced ISV applications (i.e., application to buried wastes and underground tanks) shows that significant technical and economic potential exists for using ISV to treat buried wastes and underground structures containing radionuclides and/or hazardous constituents. Present ISV applications are directed to the treatment of contaminated soils; the likelihood of using ISV to treat underground tanks depends on the resolution of significant technical and institutional issues related to this advanced application. This paper describes the ISV process and summarizes the technical progress of underground tank vitrification (UTV), discusses pertinent regulatory issues facing the use of UTV, and presents the potential cost of UTV relative to other remedial action alternatives

  19. 30 CFR 77.804 - High-voltage trailing cables; minimum design requirements.

    Science.gov (United States)

    2010-07-01

    ... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.804 High-voltage trailing cables; minimum design requirements. (a) High-voltage trailing cables used in resistance grounded systems shall be... 30 Mineral Resources 1 2010-07-01 2010-07-01 false High-voltage trailing cables; minimum design...

  20. Double Layered Sheath in Accurate HV XLPE Cable Modeling

    DEFF Research Database (Denmark)

    Gudmundsdottir, Unnur Stella; Silva, J. De; Bak, Claus Leth

    2010-01-01

    This paper discusses modelling of high voltage AC underground cables. For long cables, when crossbonding points are present, not only the coaxial mode of propagation is excited during transient phenomena, but also the intersheath mode. This causes inaccurate simulation results for high frequency...

  1. The US market for high-temperature superconducting wire in transmission cable applications

    Energy Technology Data Exchange (ETDEWEB)

    Forbes, D

    1996-04-01

    Telephone interviews were conducted with 23 utility engineers concerning the future prospects for high-temperature superconducting (HTS) transmission cables. All have direct responsibility for transmission in their utility, most of them in a management capacity. The engineers represented their utilities as members of the Electric Power Research Institute`s Underground Transmission Task Force (which has since been disbanded). In that capacity, they followed the superconducting transmission cable program and are aware of the cryogenic implications. Nineteen of the 23 engineers stated the market for underground transmission would grow during the next decade. Twelve of those specified an annual growth rate; the average of these responses was 5.6%. Adjusting that figure downward to incorporate the remaining responses, this study assumes an average growth rate of 3.4%. Factors driving the growth rate include the difficulty in securing rights-of-way for overhead lines, new construction techniques that reduce the costs of underground transmission, deregulation, and the possibility that public utility commissions will allow utilities to include overhead costs in their rate base. Utilities have few plans to replace existing cable as preventive maintenance, even though much of the existing cable has exceeded its 40-year lifetime. Ten of the respondents said the availability of a superconducting cable with the same life-cycle costs as a conventional cable and twice the ampacity would induce them to consider retrofits. The respondents said a cable with those characteristics would capture 73% of their cable retrofits.

  2. Superconducting power cables in Denmark - a case study

    DEFF Research Database (Denmark)

    Østergaard, Jacob

    1997-01-01

    A case study of a 450 MVA, 132 kV high temperature superconducting (HTS) power transmission cable has been carried out. In the study, a superconducting cable system is compared to a conventional cable system which is under construction for an actual transmission line in the Danish grid. The study...... that HTS cables will be less expensive for high power ratings, have lower losses for lines with a high load, and have a reduced reactive power production. The use of superconducting cables in Denmark accommodate plans by the Danish utility to make a substantial conversion of overhead lines to underground...

  3. Potential Impact of Submarine Power Cables on Crab Harvest

    Science.gov (United States)

    Bull, A. S.; Nishimoto, M.

    2016-02-01

    Offshore renewable energy installations convert wave or wind energy to electricity and transfer the power to shore through transmission cables laid on or buried beneath the seafloor. West coast commercial fishermen, who harvest the highly prized Dungeness crab (Metacarcinus magister) and the rock crab (Cancer spp.), are concerned that the interface of crabs and electromagnetic fields (EMF) from these cables will present an electrified fence on the seafloor that their target resource will not cross. Combined with the assistance of professional fishermen, submarine transmission cables that electrify island communities and offshore oil platforms in the eastern Pacific provide an opportunity to test the harvest of crab species across power transmission cables. In situ field techniques give commercial crab species a choice to decide if they will cross fully energized, EMF emitting, power transmission cables, in response to baited traps. Each independent trial is either one of two possible responses: the crab crosses the cable to enter a trap (1) or the crab does not cross the cable to enter a trap (0). Conditions vary among sample units by the following categorical, fixed factors (i.e., covariates) of cable structure (buried or unburied); direction of cable from crab position (west or east, north or south); time and season. A generalized linear model is fit to the data to determine whether any of these factors affect the probability of crabs crossing an energized cable to enter baited traps. Additionally, the experimental design, aside from the number of runs (set of sample trials) and the dates of the runs, is the same in the Santa Barbara Channel for rock crab and Puget Sound for Dungeness crab, and allows us to compare the capture rates of the two species in the two areas. We present preliminary results from field testing in 2015.

  4. Geophysical research results of buried relief and distribution groundwater runoff of the Aragats massif

    Directory of Open Access Journals (Sweden)

    V.P. Vardanyan

    2017-03-01

    Overall, the new data concerning the structure of the buried relief of Aragats massif and the distribution of its underground runoff allow to develop effective measures for the selection of underground waters and their rational usage for the purpose of water supply and irrigation.

  5. Modeling of Buried Wire Detection by Radio-Frequency Electromagnetic Waves

    NARCIS (Netherlands)

    Naus, H.W.L.

    2013-01-01

    The detection of buried insulated wires of finite length with a transmitter–receiver electromagnetic induction sensor is theoretically investigated. The transmitter is modeled as a magnetic dipole. Its electric field induces a current in the cable. Analytical results for its Fourier transform are

  6. Environmental Impact of a Submarine Cable: Case Study of the Acoustic Thermometry of Ocean Climate (ATOC)/ Pioneer Seamount Cable

    Science.gov (United States)

    Kogan, I.; Paull, C. K.; Kuhnz, L.; von Thun, S.; Burton, E.; Greene, H. G.; Barry, J. P.

    2003-12-01

    To better understand the potential impacts of the presence of cables on the seabed, a topic of interest for which little data is published or publicly available, a study of the environmental impacts of the ATOC/Pioneer Seamount cable was conducted. The 95 km long, submarine, coaxial cable extends between Pioneer Seamount and the Pillar Point Air Force Station in Half Moon Bay, California. Approximately two thirds of the cable lies within the Monterey Bay National Marine Sanctuary. The cable is permitted to NOAA- Oceanic and Atmospheric Research for transmitting data from a hydrophone array on Pioneer Seamount to shore. The cable was installed unburied on the seafloor in 1995. The cable path crosses the continental shelf, descends to a maximum depth of 1,933 m, and climbs back upslope to 998 m depth near the crest of Pioneer Seamount. A total of 42 hours of video and 152 push cores were collected in 10 stations along cable and control transects using the ROVs Ventana and Tiburon equipped with cable-tracking tools. The condition of the cable, its effect on the seafloor, and distribution of benthic megafauna and infauna were determined. Video data indicated the nature of interaction between the cable and the seafloor. Rocky nearshore areas, where wave energies are greatest, showed the clearest evidence of impact. Here, evidence of abrasion included frayed and unraveling portions of the cable's armor and vertical grooves in the rock apparently cut by the cable. The greatest incision and armor damage occurred on ledges between spans in irregular rock outcrop areas. Unlike the nearshore rocky region, neither the rocks nor the cable appeared damaged along outcrops on Pioneer Seamount. Multiple loops of slack cable added during a 1997 cable repair operation were found lying flat on the seafloor. Several sharp kinks in the cable were seen at 240 m water depths in an area subjected to intense trawling activity. Most of the cable has become buried with time in sediment

  7. Evaluation of underground pipe-structure interface for surface impact load

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Shen, E-mail: swang@terrapower.com

    2017-06-15

    Highlights: • A simple method is proposed for the evaluation of underground pipelines for surface impact load considering the effect of a nearby pipe-structure interface. • The proposed simple method can be used to evaluate the magnitude of damage within a short period of time after accidental drop occurs. • The proposed method is applied in a practical example and compared by using finite element analysis. - Abstract: Nuclear safety related buried pipelines need to be assessed for the effects of postulated surface impact loads. In published solutions, the buried pipe is often considered within an elastic half space without interference with other underground structures. In the case that a surface impact occurs in short distance from an underground pipe-structure interface, this boundary condition will further complicate the buried pipe evaluation. Neglecting such boundary effect in the assessment may lead to underestimating potential damage of buried pipeline, and jeopardizing safety of the nuclear power plant. Comprehensive analysis of such structure-pipe-soil system is often subjected to availability of state-of-art finite element tools, as well as costly and time consuming. Simple, but practical conservative techniques have not been established. In this study, a mechanics based solution is proposed in order to assess the magnitude of damage to a buried pipeline beneath a heavy surface impact considering the effect of a nearby pipe-structure interface. The proposed approach provides an easy to use tool in the early stage of evaluation before the decision of applying more costly technique can be made by owner of the nuclear facility.

  8. Evaluation of underground pipe-structure interface for surface impact load

    International Nuclear Information System (INIS)

    Wang, Shen

    2017-01-01

    Highlights: • A simple method is proposed for the evaluation of underground pipelines for surface impact load considering the effect of a nearby pipe-structure interface. • The proposed simple method can be used to evaluate the magnitude of damage within a short period of time after accidental drop occurs. • The proposed method is applied in a practical example and compared by using finite element analysis. - Abstract: Nuclear safety related buried pipelines need to be assessed for the effects of postulated surface impact loads. In published solutions, the buried pipe is often considered within an elastic half space without interference with other underground structures. In the case that a surface impact occurs in short distance from an underground pipe-structure interface, this boundary condition will further complicate the buried pipe evaluation. Neglecting such boundary effect in the assessment may lead to underestimating potential damage of buried pipeline, and jeopardizing safety of the nuclear power plant. Comprehensive analysis of such structure-pipe-soil system is often subjected to availability of state-of-art finite element tools, as well as costly and time consuming. Simple, but practical conservative techniques have not been established. In this study, a mechanics based solution is proposed in order to assess the magnitude of damage to a buried pipeline beneath a heavy surface impact considering the effect of a nearby pipe-structure interface. The proposed approach provides an easy to use tool in the early stage of evaluation before the decision of applying more costly technique can be made by owner of the nuclear facility.

  9. On stiffening cables of a long reach manipulator

    International Nuclear Information System (INIS)

    Wang, S.L.; Santiago, P.

    1996-01-01

    A long reach manipulator will be used for waste remediation in large underground storage tanks. The manipulator's slenderness makes it flexible and difficult to control. A low-cost and effective method to enhance the manipulator's stiffness is proposed in this research by using suspension cables. These cables can also be used to accurately measure the position of the manipulator's wrist

  10. Umbilical Cable Recovery Load Analysis

    Institute of Scientific and Technical Information of China (English)

    YAN Shu-wang; JIA Zhao-lin; FENG Xiao-wei; LI Shi-tao

    2013-01-01

    Umbilical cable is a kind of integrated subsea cable widely used in the exploration and exploitation of oil and gas field.The severe ocean environment makes great challenges to umbilical maintenance and repair work.Damaged umbilical is usually recovered for the regular operation of the offshore production system.Analysis on cables in essence is a two-point boundary problem.The tension load at the mudline must be known first,and then the recovery load and recovery angle on the vessel can be solved by use of catenary equation.The recovery analysis also involves umbilicalsoil interaction and becomes more complicated.Calculation methods for recovery load of the exposed and buried umbilical are established and the relationship between the position of touch down point and the recovery load as well as the recovery angle and recovery load are analyzed.The analysis results provide a theoretical reference for offshore on-deck operation.

  11. Vieillissement thermique des gaines PE et PVC de câbles électriques

    OpenAIRE

    Mkacher , Inès

    2012-01-01

    In France, about 35% of the electric connections are buried. These connections are, among other, constituted of synthetic cables where the insulating system is a polymer. The high costs for replacing the underground electrical cables make their lifetime prediction an important economic and strategic challenge. However, the outer sheath is the first barrier protecting the cable against water penetration. It is also considered as the most sensitive component with respect to ageing. For this rea...

  12. Air insulated cables for medium and low voltage supplies of the EVU

    Energy Technology Data Exchange (ETDEWEB)

    Dienstel, S

    1977-02-01

    Air insulated cables and insulated overhead cables are electrical components, which, by the use of new insulating materials and technology, are particularly suitable for the introduction of systems for overhead power transmission plants. They combine the favorable properties of underground cables, such as compact construction and low inductance, with their high mechanical strength. The present report deals with the construction, accessories and technical properties of these cables. The constructional and operational aspects of such systems and their costs are also discussed.

  13. 77 FR 14446 - Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 AMP XI.M41, “Buried and...

    Science.gov (United States)

    2012-03-09

    ...) Report Revision 2 AMP XI.M41, ``Buried and Underground Piping and Tanks'' AGENCY: Nuclear Regulatory...), LR- ISG-2011-03, ``Changes to GALL Report Revision 2 Aging Management Program (AMP) XI.M41, `Buried... Report Revision 2 AMP XI.M41 based on the staff's review of several license renewal applications' buried...

  14. Long term investigation of thermal behaviour of 110 kV underground transmission lines in the Belgrade area

    Energy Technology Data Exchange (ETDEWEB)

    Sredojevic, M.R.; Naumov, R.M.; Popovic, D.P. [Nikola Tesla Electrical Engineering Inst., Belgrade (Yugoslavia); Simic, M.D. [Electrical Utility Co., Belgrade (Yugoslavia)

    1997-12-31

    The paper describes the procedure for applying a special cable backfill material, developed and manufactured at the Institute ``Nikola Tesla`` for the thermal stabilisation and reduction of hot spot cable operating temperature, on specific hot spots of 110 kV underground transmission lines in the Belgrade area. The results presented in this paper are an important contribution to the proof of the justification and necessity of defining and introducing in practice new procedures for the thermal stabilisation and reduction of operating temperature of existing, as well as of new, underground transmission cable lines to be built. (author)

  15. A device for selecting the slack in underground cable for dragline excavators

    Energy Technology Data Exchange (ETDEWEB)

    Vul, Yu Ya; Koshkarev, A V; Mamkin, V M; Maslov, I G; Sapilov, A V; Simonov, Yu V; Ushakov, L I

    1982-01-01

    The patented device includes a controllable converter for the lift drive, a command apparatus, a lift drive tension regulator, a sensor of force in the lift cables and the product of this force, the speeds of the drives of the lift and the link, a force assigner and a force regulator in the lift cables and keying elements. To reduce the dynamic loads in the elastic elements of the lift mechanism and the arm, the device is equipped with a regulator for the random force in the lift cable, a sensor of the random speed of the lift drive, six keying elements with a resistor, shunted by a first keying element and switched in to the input of the second keying element and to the output of the regulator of the random force in the lift cables, to the input of which the sensor of the force in the lift cables is switched in through the sensor of the product of this force and the output of the force regulator, to the inputs of which the outputs of the command apparatus are switched in through the parallelly switched third and fourth keying elements and the output of the force sensor directly.

  16. Aspects related to replacing HV lines by HV cables on resonant grid behavior

    NARCIS (Netherlands)

    Wu, L.; Wouters, P.A.A.F.; Steennis, E.F.

    2011-01-01

    At different places worldwide EHV/HV connections partly consist of sections with underground power cables. Presently in the west of the Netherlands 20 km (i.e. 240 km single phase in total) of power cables is planned in a new 380 kV connection (Randstad380 project) grid to ensure sufficient

  17. Development of a single-phase 30 m HTS power cable

    Science.gov (United States)

    Cho, Jeonwook; Bae, Joon-Han; Kim, Hae-Jong; Sim, Ki-Deok; Kim, Seokho; Jang, Hyun-Man; Lee, Chang-Young; Kim, Dong-Wook

    2006-05-01

    HTS power transmission cables appear to be the replacement and retrofitting of underground cables in urban areas and HTS power transmission cable offers a number of technical and economic merits compared to the normal conductor cable system. A 30 m long, single-phase 22.9 kV class HTS power transmission cable system has been developed by Korea Electrotechnology Research Institute (KERI), LS Cable Ltd., and Korea Institute of Machinery and Materials (KIMM), which is one of the 21st century frontier project in Korea since 2001. The HTS power cable has been developed, cooled down and tested to obtain realistic thermal and electrical data on HTS power cable system. The evaluation results clarified such good performance of HTS cable that DC critical current of the HTS cable was 3.6 kA and AC loss was 0.98 W/m at 1260 Arms and shield current was 1000 Arms. These results proved the basic properties for 22.9 kV HTS power cable. As a next step, we have been developing a 30 m, three-phase 22.9 kV, 50 MV A HTS power cable system and long term evaluation is in progress now.

  18. Geophysical research results of buried relief and distribution groundwater runoff of the Aragats massif

    OpenAIRE

    V.P. Vardanyan; A.H. Hovhannisyan

    2017-01-01

    Based on the synthesis and reinterpretation of long-term data of geophysical studies together with the hydrology - hydrological materials it has been received new data about the buried topography and spatial distribution of groundwater runoff of the Aragats massif. First of all, it requires to determine the structure of its buried relief, which is basically a regional relief aquitard. The underground water sources are considered to be precipitation on the massif (approximately 83% of the tota...

  19. Back-to-Back Energization of a 60kV Cable Network - Inrush Currents Phenomenon

    DEFF Research Database (Denmark)

    Faria da Silva, Filipe; Bak, Claus Leth; Hansen, M. Lind

    2010-01-01

    On November 2008 the Danish government decided that all Danish transmission lines with a rated voltage equal to and below 150kV must be put underground, in order to reduce the visual pollution caused by Overhead Lines. This decision will lead to a massive use of underground cables in the Danish...... Network, and force a change in the approach used until now when planning, analyzing and operating electrical power systems. One problem that might arise is the energization of cables in parallel, as this operation may originate high inrush currents, which represent a risk to the circuit breakers connected...

  20. A Recursive Formula for the Evaluation of Earth Return Impedance on Buried Cables

    Directory of Open Access Journals (Sweden)

    Reynaldo Iracheta

    2015-09-01

    Full Text Available This paper presents an alternative solution based on infinite series for the accurate and efficient evaluation of cable earth return impedances. This method uses Wedepohl and Wilcox’s transformation to decompose Pollaczek’s integral in a set of Bessel functions and a definite integral. The main feature of Bessel functions is that they are easy to compute in modern mathematical software tools such as Matlab. The main contributions of this paper are the approximation of the definite integral by an infinite series, since it does not have analytical solution; and its numerical solution by means of a recursive formula. The accuracy and efficiency of this recursive formula is compared against the numerical integration method for a broad range of frequencies and cable  configurations. Finally, the proposed method is used as a subroutine for cable parameter calculation in the inverse Numerical Laplace Transform (NLT to obtain accurate transient responses in the time domain.

  1. Soil scientific supervision of 220/38 kV cable circuits of the power station 'Eemscentrale' in the Dutch province Groningen: Part 2

    International Nuclear Information System (INIS)

    Langevoord, J.; Kraeima, A.F.

    1995-01-01

    Recently, five underground cable circuits were completed at the site of the EPON (an energy utility for the north-eastern part of the Netherlands) title power station, consisting of two 220 kV and two 380 kV connections with a total length of 24 km. In a previous article, attention is paid to theoretical aspects of heat transfer of cables for underground electricity transport, the research method of the soil scientific survey, and the results of the survey for the design of the cable connection, to be made by NKF (cable manufacturer) and for the final execution of the cable design. In this article attention will be paid to soil scientific marginal conditions and soil scientific supervision during the realization. 1 fig., 2 tabs., 2 refs

  2. Laser-induced acoustic imaging of underground objects

    Science.gov (United States)

    Li, Wen; DiMarzio, Charles A.; McKnight, Stephen W.; Sauermann, Gerhard O.; Miller, Eric L.

    1999-02-01

    This paper introduces a new demining technique based on the photo-acoustic interaction, together with results from photo- acoustic experiments. We have buried different types of targets (metal, rubber and plastic) in different media (sand, soil and water) and imaged them by measuring reflection of acoustic waves generated by irradiation with a CO2 laser. Research has been focused on the signal acquisition and signal processing. A deconvolution method using Wiener filters is utilized in data processing. Using a uniform spatial distribution of laser pulses at the ground's surface, we obtained 3D images of buried objects. The images give us a clear representation of the shapes of the underground objects. The quality of the images depends on the mismatch of acoustic impedance of the buried objects, the bandwidth and center frequency of the acoustic sensors and the selection of filter functions.

  3. 3D Approach for Representing Uncertainties of Underground Utility Data

    NARCIS (Netherlands)

    olde Scholtenhuis, Léon Luc; Zlatanova, S.; den Duijn, Xander; Lin, Ken-Yu; El-Gohary, Nora; Tang, Pingbo

    Availability of 3D underground information models is key to designing and managing urban infrastructure construction projects. Buried utilities information is often registered by using different types of location data with different uncertainties. These data variances are, however, not considered in

  4. Sound cable crossing brings inexpensive electric power to Long Island

    International Nuclear Information System (INIS)

    Grzan, J.; Goyette, R.

    1992-01-01

    This paper reports that while many electric-utility customers in New York State benefit from inexpensive hydroelectric power from Canada and upstate New York, lack of sufficient transmission connections have prevented this electricity from reaching Long Island. However, a newly constructed underground/underwater link capable of carrying 700-MW now transmits low-cost electricity to the island, saving money for customers. The self-contained fluid-filled cable used for the underwater portion of the project is the largest underwater cable in the world. The use of high-pressure, fluid-filled pipe-type cable on the land portion represents the largest application of paper-polypropylene-paper (PPP) insulated cable in the United States. State-of-the-art technologies were implemented in the use of temperature monitoring and leak detection systems, SF 6 gas-insulated substation, and underwater cable laying and embedment techniques

  5. Use of Microsoft HoloLens to survey and visualize buried networks

    CERN Multimedia

    CERN. Geneva

    2017-01-01

    Survey and positioning of buried infrastructure networks are crucial issues for their maintenance and a starting point for every new Civil Engineering project. 3DCity is a research & development project which consists in a development of software providing a method for quick underground pipe networks surveying and holographic visualization, by using Microsoft HoloLens devices.

  6. Power cables now and in the future

    Energy Technology Data Exchange (ETDEWEB)

    Wanser, G

    1976-01-01

    A survey is presented of the problems to be faced with the underground supply of electric power to large, urban areas and of the contributions that improvements in power cable technology will make to solving these problems. It is concluded that the increase in population densities and the rising demand for energy on the part of individual consumers bring up problems for electricity supply and thus have a direct influence on development trends in cable engineering. During the last few years the increasing capacities required in power transmission have led to the use of higher voltages and to the application of special methods of cooling for the oil-filled cable. When the technical and economic possibilities with present-day cable techniques have been exhausted, we must anticipate the introduction of new types of cable, i.e., gas-insulated cables and superconducting cables. The problems involved in power distribution are being solved successfully by resorting to larger conductor cross-sectional areas and by raising the voltage levels. The advantages of plastic cables are also being utilized on a wide scale. The requirement that there be freedom from partial discharges in plastic cables operating at medium and higher voltages is becoming increasingly more widely adopted as a new quality criterion in cable engineering. New materials from the polymer range are permitting the introduction of fittings which are easier to install and which reduce costs. Cable engineering has already, to a considerable extent, adapted itself to face future problems. Even so, there are still a large number of problems in cable engineering requiring research, development and operation.

  7. Interconnection of the Keys north of the country with the National Electro energetic System (SEN) through a submarine cable

    International Nuclear Information System (INIS)

    Sánchez Yañez, Pablo

    2017-01-01

    Most of the keys of the north of the country have a high potential for tourism Sun and beach, which is why each has an associated infrastructure that allows hotels have the necessary quality standards. Within this infrastructure the continuous electrical service must have each hotel to meet the needs of tourists stands. Today the keys are isolated from the SEN and electrical service is supplied by generators. These groups feed on fuel and diesel, and generate polluting gases near where the major hotel groups are. The problems in transporting fuel and pollution they generate have led to begin to analyze different ways of providing electric service stably in the keys. One possible option to address the problems generated by power generators in an isolated system is to interconnect the cay with SEN. This connection can be made in three ways; by airlines, underground cables or submarine cables. The airlines in the tourist areas are discarded because they affect the visuality this is why variants of underground cables or submarines are almost always handled. The proposal is to interconnect the keys with submarine cable where current conditions do not allow the use of underground cables. This interconnection can meet the demand of the keys stably and more reliably than current conditions. In addition to cases where there is a tourism growth should be no more generators only have a cable with the ability to transfer all the power needed. (author)

  8. 77 FR 19525 - Specification for 15 kV and 25 kV Primary Underground Power Cable

    Science.gov (United States)

    2012-04-02

    ... resistant cables shall have strip tension of 0 through 18 pounds (0 through 8.16 kg). Comment: General Cable suggested changing the requirement of stripping tension for TR-XLPE cable to the industry standard of a maximum of 24 lb. Limiting the maximum stripping tension to 18 lb will cause quality cable to be rejected...

  9. Urban underground infrastructure mapping and assessment

    Science.gov (United States)

    Huston, Dryver; Xia, Tian; Zhang, Yu; Fan, Taian; Orfeo, Dan; Razinger, Jonathan

    2017-04-01

    This paper outlines and discusses a few associated details of a smart cities approach to the mapping and condition assessment of urban underground infrastructure. Underground utilities are critical infrastructure for all modern cities. They carry drinking water, storm water, sewage, natural gas, electric power, telecommunications, steam, etc. In most cities, the underground infrastructure reflects the growth and history of the city. Many components are aging, in unknown locations with congested configurations, and in unknown condition. The technique uses sensing and information technology to determine the state of infrastructure and provide it in an appropriate, timely and secure format for managers, planners and users. The sensors include ground penetrating radar and buried sensors for persistent sensing of localized conditions. Signal processing and pattern recognition techniques convert the data in information-laden databases for use in analytics, graphical presentations, metering and planning. The presented data are from construction of the St. Paul St. CCTA Bus Station Project in Burlington, VT; utility replacement sites in Winooski, VT; and laboratory tests of smart phone position registration and magnetic signaling. The soil conditions encountered are favorable for GPR sensing and make it possible to locate buried pipes and soil layers. The present state of the art is that the data collection and processing procedures are manual and somewhat tedious, but that solutions for automating these procedures appear to be viable. Magnetic signaling with moving permanent magnets has the potential for sending lowfrequency telemetry signals through soils that are largely impenetrable by other electromagnetic waves.

  10. New, clean handling process introduced to improve cable quality

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, C G

    1990-05-01

    The clean room system introduced by Canada Wire and Cable Limited in its Toronto plant for its cable manufacturing operation is described. While clean room technology is common in the food processing industry, optical and aerospace manufacturing processes, this is the first time it has been applied to wire and cable extrusion in North America. The purpose of the clean compound handling system is to prevent particle contamination in the shielding and cable insulation materials, as part of an effort to prevent premature underground electric cable failures. Two rooms are dedicated to handling different types of insulation compound, two are dedicated to receiving semi-conducting shielding material, and the fifth room functions as an air lock for the two insulation rooms. The atmosphere is highly regulated with programmable logic control. The air supply filters capture 99.97% of all particles 0.3 microns or larger. The system also maintains air temperature, relative humidity and static pressure. The life variability of cross-linked polyethylene primary distribution cable is dependant on five factors: material purity, extra clean compound handling, cable design, manufacturing process, and installation and operation practices. The clean room system is expected to result in cable that is more resistant to water treeing failures. 2 figs.

  11. Assessment of transient stability of cable based transmission grids with reactive power compensation

    DEFF Research Database (Denmark)

    Foo, Yii; Dall, Laurids; Silva, Filipe Miguel Faria da

    2017-01-01

    Underground transmission cables are gaining popularity due to its applications near cities and aesthetic purpose. For example in Denmark, the transmission power grid is changing significantly as many conventional overhead lines (OHL) are replaced by cables and more is expected over the coming years...... through a series of sensitivity analysis with respect to the cables compensation degree. A separate case of disconnecting the SRs of the faulted line is also carried out. The tendencies are initially observed and explained for smaller systems, Single-Machine Infinite Bus (SMIB) and 9-bus system...

  12. Power applications for superconducting cables in Denmark

    DEFF Research Database (Denmark)

    Tønnesen, Ole; Østergaard, Jacob; Olsen, S. Krüger

    1999-01-01

    In Denmark a growing concern for environmental protection has lead to wishes that the open country is kept free of overhead lines as far as possible. New lines under 100 kV and existing 60/50 kV lines should be established as underground cables. Superconducting cables represent an interesting...... in cases such as transmission of energy into cities and through areas of special interest. The planned large groups of windmills in Denmark generating up to 2000 MVA or more both on dry land and off-shore will be an obvious case for the application of superconducting AC or DC cables. These opportunities...... can be combined with other new technologies such as HVDC light transmission using isolated gate bipolar transistors (IGBTs). The network needed in a system with a substantial wind power generation has to be very strong in order to handle energy fluctuations. Such a network will be possible...

  13. Full-scale horizontal cable-tray tests: Fire-propagation characteristics

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    At the Fermi National Accelerator Center (Fermilab), as at any high-energy physics laboratory, the experimental program depends on complex arrays of equipment that require years to assemble and place in service. These equipment arrays are typically located in enclosed tunnels or experimental halls and could be destroyed by rapidly propagating, uncontrolled fire. Cable trays, both vertical and horizontal, are an integral and ubiquitous component of these installations. Concurrently, throughout industry and within the professional fire-fighting community, there has been concern over the flammability and fire propagation characteristics of electrical cables in open cable trays. While some information was available concerning fire propagation in vertical cable trays, little was known about fires in horizontal cable trays. In view of the potential for loss of equipment and facilities, not to mention the programmatic impact of a fire, Fermilab initiated a program of full-scale, horizontal cable-tray fire tests to determine the flammability and rate of horizontal fire propagation in cable-tray configurations and cable mixed typical of those existing in underground tunnel enclosures and support buildings as Fermilab. This series of tests addressed the effects of ventilation rates and cable-tray fill, fire-fighting techniques, and the effectiveness and value of automatic sprinklers, smoke detection, and cable-coating fire barriers in detecting, controlling, or extinguishing a cable-tray fire. Detailed descriptions of each fire test, including sketches of cable-tray configuration and contents, instrumentation, ventilation rates, Fermilab Fire Department personnel observations, photographs, and graphs of thermocouple readings are available in a report of these tests prepared by the Fermilab Safety Section

  14. Spotting Radioactive Sources Buried Underground Using an Airborne Radiation Monitoring System

    International Nuclear Information System (INIS)

    Sheinfeld, M.; Wengrowicz, U.; Beck, A.; Marcus, E.; Tirosh, D.

    2002-01-01

    This article provides theoretical background concerning the capability of the Airborne Radiation Monitoring System [1]to detect fission products buried at 1-meter depth under the ground surface,at a flight altitude of 100 meters above ground.The 137 Cs source was used as a typical fission product. The System monitors radioactive contamination in the air or on the ground using two 2 inch NaI(Tl) scintillation detectors and computerized accessories for analysis purposes

  15. Permanent burying method for product

    International Nuclear Information System (INIS)

    Sakai, Goro; Sakata, Noboru; Hironaka, Yoshikazu; Shigematsu, Kazuo; Yurugi, Masahiro; Minami, Masayoshi; Yoshisaki, Masato.

    1995-01-01

    In a method of permanently burying an object by filling and solidifying a cement mortar in gaps between each of objects to be buried underground, cement mortar is filled into gaps, which comprises water at a unit amount determined as from 200 to 250kg/m 3 , a cement at low water/cement ratio (%) of from 70 to 400%, and contains fine powder having an average grain size of not greater than 100μm (not containing cement) of 50 to 800kg/m 3 , fine aggregates of 800 to 1200kg/m 3 , UERAN gum (a bio-gum powder produced by aerobic fermentation of alcaligenes-bacteria) of 20g/m 3 to 1.3kg/m 3 , a dispersing agent of 0 to 40kg/m 3 , a swelling agent of 0 to 40kg/m 3 . Then if the mortar blended with the UERAN gum is injected, any gaps can be filled tightly, no breeding is caused and since the amount of cement is small, it does not suffer from temperature cracking. Therefore, the state of filling is kept permanently, and environmental pollution caused by radioactive wastes can be prevented. (N.H.)

  16. Modelling of long High Voltage AC Cables in the Transmission System

    DEFF Research Database (Denmark)

    Gudmundsdottir, Unnur Stella

    : conductor-insulation (with or without SC layers)-conductor-insulation(-conductor-insulation), whereas a transmission line single core XLPE cable will normally have the configuration: conductor-SC layerinsulation-SC layer-conductor-SC layer-conductor-insulation. Furthermore the existing cable models use......, EMTDC/PSCAD is provided. A typical HV AC underground power cable is formed by 4 main layers, namely; Conductor-Insulation-Screen-Insulation. In addition to these main layers, the cable also has semiconductive screens, swelling tapes and metal foil. For high frequency modelling in EMT-based software......-SC layer-solid hollow conductor) is implemented in the model. These improvements result in a more correct series impedance and hence a more correct damping of the simulations. Even though the series impedance is more correct, it does still not include the proximity effect and high frequency oscillations...

  17. Report on full-scale horizontal cable tray fire tests, FY 1988

    International Nuclear Information System (INIS)

    Riches, W.M.

    1988-09-01

    In recent years, there has been much discussion throughout industry and various governmental and fire protection agencies relative to the flammability and fire propagation characteristics of electrical cables in open cable trays. It has been acknowledged that under actual fire conditions, in the presence of other combustibles, electrical cable insulation can contribute to combustible fire loading and toxicity of smoke generation. Considerable research has been conducted on vertical cable tray fire propagation, mostly under small scale laboratory conditions. In July 1987, the Fermi National Accelerator Laboratory initiated a program of full scale, horizontal cable tray fire tests, in the absence of other building combustible loading, to determine the flammability and rate of horizontal fire propagation in cable tray configurations and cable mixes typical of those existing in underground tunnel enclosures and support buildings at the Laboratory. The series of tests addressed the effects of ventilation rates and cable tray fill, fire fighting techniques, and effectiveness and value of automatic sprinklers, smoke detection and cable coating fire barriers in detecting, controlling or extinguishing a cable tray fire. This report includes a description of the series of fire tests completed in June 1988, as well as conclusions reached from the test results

  18. Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison

    International Nuclear Information System (INIS)

    Kelley, Nathan; Corsaro, Pietro

    2004-01-01

    Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects

  19. Trend analysis of cables failure events at nuclear power plants

    International Nuclear Information System (INIS)

    Fushimi, Yasuyuki

    2007-01-01

    In this study, 152 failure events related with cables at overseas nuclear power plants are selected from Nuclear Information Database, which is owned by The Institute of Nuclear Safety System, and these events are analyzed in view of occurrence, causal factor, and so on. And 15 failure events related with cables at domestic nuclear power plants are selected from Nuclear Information Archives, which is owned by JANTI, and these events are analyzed by the same manner. As a result of comparing both trends, it is revealed following; 1) A cable insulator failure rate is lower at domestic nuclear power plants than at foreign ones. It is thought that a deterioration diagnosis is performed broadly in Japan. 2) Many buried cables failure events have been occupied a significant portion of cables failure events during work activity at overseas plants, however none has been occurred at domestic plants. It is thought that sufficient survey is conducted before excavating activity in Japan. 3) A domestic age related cables failure rate in service is lower than the overseas one and domestic improper maintenance rate is higher than the overseas one. Maintenance worker' a skill improvement is expected in order to reduce improper maintenance. (author)

  20. X-ray method for studying butt gapp distribution and spliced joints in lapped paper and plastic cables

    International Nuclear Information System (INIS)

    Muller, A.C.

    1976-01-01

    Accurate taping patterns are essential in paper and plastic lapped underground cables. A newly developed radiographic system makes it possible to examine the structure of cables and splices in a nondestructive manner. This technique appears to be an effective tool for use in both the monitoring of the accuracy of lapping techniques and as an aid in locating defective portions of existing cables. A discussion of the method and some preliminary results are reported

  1. Control of a long reach manipulator with suspension cables for waste storage tank remediation. Final report

    International Nuclear Information System (INIS)

    Wang, S.L.

    1994-01-01

    A long reach manipulator will be used for waste remediation in large underground storage tanks. The manipulator's slenderness makes it flexible and difficult to control. A low-cost and effective method to enhance the manipulator's stiffness is proposed in this research by using suspension cables. These cables can also be used to accurately measure the position of the manipulator's wrist

  2. Method for analysis the complex grounding cables system

    International Nuclear Information System (INIS)

    Ackovski, R.; Acevski, N.

    2002-01-01

    A new iterative method for the analysis of the performances of the complex grounding systems (GS) in underground cable power networks with coated and/or uncoated metal sheathed cables is proposed in this paper. The analyzed grounding system consists of the grounding grid of a high voltage (HV) supplying transformer station (TS), middle voltage/low voltage (MV/LV) consumer TSs and arbitrary number of power cables, connecting them. The derived method takes into consideration the drops of voltage in the cable sheets and the mutual influence among all earthing electrodes, due to the resistive coupling through the soil. By means of the presented method it is possible to calculate the main grounding system performances, such as earth electrode potentials under short circuit fault to ground conditions, earth fault current distribution in the whole complex grounding system, step and touch voltages in the nearness of the earthing electrodes dissipating the fault current in the earth, impedances (resistances) to ground of all possible fault locations, apparent shield impedances to ground of all power cables, e.t.c. The proposed method is based on the admittance summation method [1] and is appropriately extended, so that it takes into account resistive coupling between the elements that the GS. (Author)

  3. 300 Area signal cable study

    International Nuclear Information System (INIS)

    Whattam, J.W.

    1994-01-01

    This report was prepared to discuss the alternatives available for removing the 300 Area overhead signal cable system. This system, installed in 1969, has been used for various monitoring and communication signaling needs throughout the 300 Area. Over the years this cabling system has deteriorated, has been continually reconfigured, and has been poorly documented to the point of nonreliability. The first step was to look at the systems utilizing the overhead signal cable that are still required for operation. Of the ten systems that once operated via the signal cable, only five are still required; the civil defense evacuation alarms, the public address (PA) system, the criticality alarms, the Pacific Northwest Laboratory Facilities Management Control System (FMCS), and the 384 annunciator panel. Of these five, the criticality alarms and the FMCS have been dealt with under other proposals. Therefore, this study focused on the alternatives available for the remaining three systems (evacuation alarms, PA system, and 384 panel) plus the accountability aid phones. Once the systems to be discussed were determined, then three alternatives for providing the signaling pathway were examined for each system: (1) re-wire using underground communication ducts, (2) use the Integrated Voice/Data Telecommunications System (IVDTS) already installed and operated by US West, and (3) use radio control. Each alternative was developed with an estimated cost, advantages, and disadvantages. Finally, a recommendation was provided for the best alternative for each system

  4. Assessing potential impacts of energized submarine power cables on crab harvests

    Science.gov (United States)

    Love, Milton S.; Nishimoto, Mary M.; Clark, Scott; McCrea, Merit; Bull, Ann Scarborough

    2017-12-01

    Offshore renewable energy facilities transmit electricity to shore through submarine power cables. Electromagnetic field emissions (EMFs) are generated from the transmission of electricity through these cables, such as the AC inter-array (between unit) and AC export (to shore) cables often used in offshore energy production. The EMF has both an electric component and a magnetic component. While sheathing can block the direct electric field, the magnetic field is not blocked. A concern raised by fishermen on the Pacific Coast of North America is that commercially important Dungeness crab (Metacarcinus magister Dana, 1852)) might not cross over an energized submarine power cable to enter a baited crab trap, thus potentially reducing their catch. The presence of operating energized cables off southern California and in Puget Sound (cables that are comparable to those within the arrays of existing offshore wind energy devices) allowed us to conduct experiments on how energized power cables might affect the harvesting of both M. magister and another commercially important crab species, Cancer productus Randall, 1839. In this study we tested the questions: 1) Is the catchability of crabs reduced if these animals must traverse an energized power cable to enter a trap and 2) if crabs preferentially do not cross an energized cable, is it the cable structure or the EMF emitted from that cable that deters crabs from crossing? In field experiments off southern California and in Puget Sound, crabs were given a choice of walking over an energized power cable to a baited trap or walking directly away from that cable to a second baited trap. Based on our research we found no evidence that the EMF emitted by energized submarine power cables influenced the catchability of these two species of commercially important crabs. In addition, there was no difference in the crabs' responses to lightly buried versus unburied cables. We did observe that, regardless of the position of the cable

  5. FY-95 technology catalog. Technology development for buried waste remediation

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) Buried Waste Integrated Demonstration (BWID) program, which is now part of the Landfill Stabilization Focus Area (LSFA), supports applied research, development, demonstration, and evaluation of a multitude of advanced technologies dealing with underground radioactive and hazardous waste remediation. These innovative technologies are being developed as part of integrated comprehensive remediation systems for the effective and efficient remediation of buried waste sites throughout the DOE complex. These efforts are identified and coordinated in support of Environmental Restoration (EM-40) and Waste Management (EM-30) needs and objectives. Sponsored by the DOE Office of Technology Development (EM-50), BWID and LSFA work with universities and private industry to develop technologies that are being transferred to the private sector for use nationally and internationally. This report contains the details of the purpose, logic, and methodology used to develop and demonstrate DOE buried waste remediation technologies. It also provides a catalog of technologies and capabilities with development status for potential users. Past FY-92 through FY-94 technology testing, field trials, and demonstrations are summarized. Continuing and new FY-95 technology demonstrations also are described

  6. FY-95 technology catalog. Technology development for buried waste remediation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The US Department of Energy`s (DOE) Buried Waste Integrated Demonstration (BWID) program, which is now part of the Landfill Stabilization Focus Area (LSFA), supports applied research, development, demonstration, and evaluation of a multitude of advanced technologies dealing with underground radioactive and hazardous waste remediation. These innovative technologies are being developed as part of integrated comprehensive remediation systems for the effective and efficient remediation of buried waste sites throughout the DOE complex. These efforts are identified and coordinated in support of Environmental Restoration (EM-40) and Waste Management (EM-30) needs and objectives. Sponsored by the DOE Office of Technology Development (EM-50), BWID and LSFA work with universities and private industry to develop technologies that are being transferred to the private sector for use nationally and internationally. This report contains the details of the purpose, logic, and methodology used to develop and demonstrate DOE buried waste remediation technologies. It also provides a catalog of technologies and capabilities with development status for potential users. Past FY-92 through FY-94 technology testing, field trials, and demonstrations are summarized. Continuing and new FY-95 technology demonstrations also are described.

  7. Detection of buried pipes by polarimetric borehole radar; Polarimetric borehole radar ni yoru maisetsukan no kenshutsu jikken

    Energy Technology Data Exchange (ETDEWEB)

    Sato, M.; Niitsuma, H. [Tohoku University, Sendai (Japan); Nakauchi, T. [Osaka Gas Co. Ltd., Osaka (Japan)

    1997-05-27

    If the borehole radar is utilized for detection of buried pipes, the underground radar measurement becomes possible even in the situation where the mesurement on the earth surface is difficult, for example, such a place as under the road where there is much traffic. However, since buried pipes are horizontally installed and the existing borehole radar can send/receive only vertical polarization, the measurement conducted comes to be poor in efficiency from a viewpoint of the polarization utilization. Therefore, by introducing the polarimetric borehole radar to the detection of buried pipes, a basic experiment was conducted for the effective detection of horizontal buried pipes. Proposing the use of a slot antenna which can send/receive horizontal polarization in borehole in addition to a dipole antenna which sends/receives vertical polarization, developed was a step frequency type continuous wave radar of a network analyzer basis. As a result of the experiment, it was confirmed that reflection from buried pipes is largely dependent on polarization. Especially, it was found that in the slot dipole cross polarization mesurement, reflection from buried pipes can be emphasized. 4 refs., 5 figs.

  8. Risk assessment of 170 kV GIS connected to combined cable/OHL network

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Kessel, Jakob; Atlason, Vidir

    2009-01-01

    performance, compared to a system consisting solely of AIS connected through overhead lines. The main purpose is to investigate whether overvoltage protection is necessary at the GIS busbar. The analysis is conducted by implementing a simulation model in PSCAD/EMTDC. Simulations are conducted for both SF......This paper concerns different investigations of lightning simulation of a combined 170 kV overhead line/cable connected GIS. This is interesting due to the increasing amount of underground cables and GIS in the Danish transmission system. This creates a different system with respect to lightning...... and BFO. Overvoltages are evaluated for varying front times of the lightning surge, different soil resistivities at the surge arrester grounding in the overhead line/cable transition point and a varying length of the connection cable between the transformer and the GIS busbar with a SA implemented...

  9. Microwave heating of electric cable insulated wires before their impregnation with a hydrophobic material

    Energy Technology Data Exchange (ETDEWEB)

    Niculae, D; Mihailescu, A [Romanian Electricity Authority (Romania); Indreias, I; Martin, D [Institute of Atomic Physics, Bucharest (Romania); Margaritescu, A [ICPE Electrostatica, Bucharest, (Romania); Zlatonovici, D

    1998-12-31

    Underground insulated telecommunication cables must be impregnated with a hydrophobic material in order to prevent water penetration damage. To do so, the cable wire bundle must be heated to a temperature of 60 to 90 degrees C to ensure proper fluidity of the hydrophobic material that must fill the free spaces between the copper wires of the telephone cable. This paper described the microwave heating method of the wires before their impregnation. A cylindrical applicator was designed to perform a telephone bundle heating test. 800 W of microwave power were used on a telephone cable made up of 800 wires of 0.4 mm in diameter. A uniform heating was obtained throughout the section. Microwave heating was also found to be 53 per cent more energy efficient than hot air heating. 4 refs., 4 figs.

  10. HTS Transmission Cable System for installation in the Long Island Power Grid

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Frank [American Superconductor Corporation, Devens, MA (United States); Durand, Fabien [American Superconductor Corporation, Devens, MA (United States); Maguire, James [American Superconductor Corporation, Devens, MA (United States)

    2015-10-05

    Department of Energy (DOE) Award DE-FC26-07NT43240 was issued on October 1, 2007. Referred to as LIPA2, the principal objectives of the project were to develop key components required to deploy and demonstrate second-generation (2G) high temperature superconductor (HTS) cables in a 600 meter (2000 feet) underground segment of a 138kV three-phase transmission circuit of the Long Island Power Authority (LIPA) power grid. A previous effort under DOE Award DE-FC36-03GO13032 (referred to as LIPA1) resulted in installation (and subsequent successful operation) of first-generation (1G) HTS cables at the LIPA site. As with LIPA1, American Superconductor (AMSC) led the effort for LIPA2 and was responsible for overall management of the project and producing sufficient 2G wire to fabricate the required cable. Nexans' tasks included design/manufacture/installation of the cable, joint (splice), cable terminations and field repairable cryostat; while work by Air Liquide involved engineering and installation support for the refrigeration system modifications.

  11. Accumulation of radon in the underground detector cups

    International Nuclear Information System (INIS)

    Qiu Yuanhuo.

    1985-01-01

    Theoretical calculations based on the radon migration mechanism (i. e. diffusion, convection and atmospheric pumping etc) show that the balance of radon concentration in underground detector cups buried and in surrounding soil gas requires about 0.7-10 hours. However, the equilibrium of radon with its daughter products in the cups needs about 4 hours. Therefore, it is considered that 4.5-12 hours are needed for these two processes. It takes 3-4 days for Tn to reach radioactive equilibrium with its short-lived daughter products. When thorium concentration is higher than background exposure time of the detector cups should be over 3-4 days. Using buried detector cups, field experiments give correlative results compared with those of theoretical calculations. The study is oriented both for optimizing the burial time of the detector cup and interpretation of radon anomalies detected

  12. Magnetic fields and childhood cancer: an epidemiological investigation of the effects of high-voltage underground cables

    International Nuclear Information System (INIS)

    Bunch, K J; Vincent, T J; Murphy, M F G; Swanson, J

    2015-01-01

    Epidemiological evidence of increased risks for childhood leukaemia from magnetic fields has implicated, as one source of such fields, high-voltage overhead lines. Magnetic fields are not the only factor that varies in their vicinity, complicating interpretation of any associations. Underground cables (UGCs), however, produce magnetic fields but have no other discernible effects in their vicinity. We report here the largest ever epidemiological study of high voltage UGCs, based on 52 525 cases occurring from 1962–2008, with matched birth controls. We calculated the distance of the mother’s address at child’s birth to the closest 275 or 400 kV ac or high-voltage dc UGC in England and Wales and the resulting magnetic fields. Few people are exposed to magnetic fields from UGCs limiting the statistical power. We found no indications of an association of risk with distance or of trend in risk with increasing magnetic field for leukaemia, and no convincing pattern of risks for any other cancer. Trend estimates for leukaemia as shown by the odds ratio (and 95% confidence interval) per unit increase in exposure were: reciprocal of distance 0.99 (0.95–1.03), magnetic field 1.01 (0.76–1.33). The absence of risk detected in relation to UGCs tends to add to the argument that any risks from overhead lines may not be caused by magnetic fields. (paper)

  13. Field investigation and analysis of buried pipelines under various seismic environments. Technical report

    Energy Technology Data Exchange (ETDEWEB)

    Wang, L.R.L.

    1982-08-01

    A research project is proposed in which the behavior of oil, water, sewer, and gas pipelines under various seismic environments, including seismic shaking and large ground deformation would be investigated. It is suggested that the investigation be conducted in the Beijing and Tangshan areas. Three major hazards to underground pipelines are identified: the effect of wave propagation; ground rupture and differential movement along fault lines; and soil liquefaction induced by ground shaking. Ruptures or severe distortions of the pipe are most often associated with fault movements, landslides, or ground squeeze associated with fault zones. A model is presented to evaluate the general longitudinal responses of buried pipelines, both segmented and continuous, subjected to ground shakings and vibrations. The results of these tests will be used to develop aseismic codes for buried pipelines.

  14. Power System Technical Performance Issues Related to the Application of Long HVAC Cables

    DEFF Research Database (Denmark)

    Bak, Claus Leth

    The aim of this TB is to serve as a practical guide for preparing models and performing studies necessary during the assessment of the technical performance of HV/EHV systems with a large share of (long) AC cables. The brochure follows all phases of planning and analysis of a typical underground...

  15. Soil scientific survey of 220/38 kV cable circuits of the power station 'Eemscentrale' in the Dutch province Groningen; Theoretical backgrounds, research method and results

    International Nuclear Information System (INIS)

    Langevoord, J.; Van Loon, L.J.M.

    1995-01-01

    Recently, five underground cable circuits were completed at the site of the EPON (an energy utility for the north-eastern part of the Netherlands) title power station, consisting of two 220 kV and two 380 kV connections with a total length of 24 km. Soil scientific in situ investigations and laboratory tests were carried out in advance to collect data, on the basis of which thermal resistivity and critical thermal conditions could be calculated. It was demonstrated by the calculated results that no de-hydrated zones occurred around the cable for design criteria conditions. Optimal cable bed conditions could be achieved, using some of the sand excavated from the trench. In this article, attention will be paid to theoretical aspects of heat transfer of cables for underground electricity transport, the research method of the soil scientific survey, and the results of the survey for the design of the cable connection, to be made by NKF (cable manufacturer) and for the final execution of the cable design. In the second article, to be published in a next issue of this magazine, attention will be paid to soil scientific marginal conditions and soil scientific supervision during the realization. 9 figs., 6 tabs., 9 refs

  16. The performance of transmission lines and cables subjected to electromagnetic radiation from a nuclear explosion (NEMP)

    International Nuclear Information System (INIS)

    Aguet, M.; Ianovici, M.; Lin, C.C.; Fornerod, F.

    1980-01-01

    The use of armoured cables for telecommunication and data transmission systems is practically essential to avoid electromagnetic interference. The authors have made a mathematical study of the probable effect of a high altitude nuclear explosion. Using a simplified model, the voltages and currents induced into single and multiple-sheathed, overhead and buried cables subjected to an intense magnetic pulse (50kV/m) from high altitude, are determined by computer. It is found that, contrary to expectations the current intensity in the second case is seven times greater than for the overhead conductor. (F.N.S.)

  17. Monitoring underground water leakage pattern by ground penetrating radar (GPR) using 800 MHz antenna frequency

    Science.gov (United States)

    Amran, T. S. T.; Ismail, M. P.; Ahmad, M. R.; Amin, M. S. M.; Ismail, M. A.; Sani, S.; Masenwat, N. A.; Basri, N. S. M.

    2018-01-01

    Water is the most treasure natural resources, however, a huge amount of water are lost during its distribution that leads to water leakage problem. The leaks meant the waste of money and created more economic loss to treat and fix the damaged pipe. Researchers and engineers have put tremendous attempts and effort, to solve the water leakage problem especially in water leakage of buried pipeline. An advanced technology of ground penetrating radar (GPR) has been established as one of the non-destructive testing (NDT) method to detect the underground water pipe leaking. This paper focuses on the ability of GPR in water utility field especially on detection of water leaks in the underground pipeline distribution. A series of laboratory experiments were carried out using 800-MHz antenna, where the performance of GPR on detecting underground pipeline and locating water leakage was investigated and validated. A prototype to recreate water-leaking system was constructed using a 4-inch PVC pipe. Different diameter of holes, i.e. ¼ inch, ½ inch, and ¾ inch, were drilled into the pipe to simulate the water leaking. The PVC pipe was buried at the depth of 60 cm into the test bed that was filled with dry sand. 15 litres of water was injected into the PVC pipe. The water leakage patterns in term of radargram data were gathered. The effectiveness of the GPR in locating the underground water leakage was ascertained, after the results were collected and verified.

  18. Particle Shape Effect on Macroscopic Behaviour of Underground Structures: Numerical and Experimental Study

    Directory of Open Access Journals (Sweden)

    Szarf Krzysztof

    2015-02-01

    Full Text Available The mechanical performance of underground flexible structures such as buried pipes or culverts made of plastics depend not only on the properties of the structure, but also on the material surrounding it. Flexible drains can deflect by 30% with the joints staying tight, or even invert. Large deformations of the structure are difficult to model in the framework of Finite Element Method, but straightforward in Discrete Element Methods. Moreover, Discrete Element approach is able to provide information about the grain-grain and grain-structure interactions at the microscale. This paper presents numerical and experimental investigations of flexible buried pipe behaviour with focus placed on load transfer above the buried structure. Numerical modeling was able to reproduce the experimental results. Load repartition was observed, being affected by a number of factors such as particle shape, pipe friction and pipe stiffness.

  19. Development of a superconducting cable for transmission of high electric power

    International Nuclear Information System (INIS)

    Moisson, F.; Leroux, J.M.

    1971-01-01

    The opportunities opened by the use of cryoresistive and superconducting materials in underground transmission systems have led to a cryocable program. A first set of problems associated with the development of cryogenic cables deals with the cable system, i.e., design, safety, terminal equipment including leads, cryogenic equipment, refrigerators, and problems related to overload capability and reliability. A second set concerns the cable itself, i.e., scientific and technological problems associated with the conductor, the electrical insulation, and the thermal exchange between conductor and helium. Useful experience is gained on the design problems and on the technological problems involved in the construction of a cryoconducting cable. A 20-M aluminum cable cooled down to 25 0 K with pressurized helium flow was built and tested with 3500-A dc under 20 Kv; results are presented. On this model the following types of problems were solved. First, mechanical problems concerning cooling of the cable, thermal contraction of the pipes, electrical insulation and conductors, construction of an invariable cable constituted by elementary helically wound conductors were solved. Second, thermal problems of reduction of heat leaks, conception of thermal insulation, and segmentation of vacuum jackets were solved. Third, electrical problems of design of 300 0 to 25 0 K leads were solved; this problem of losses at both ends is, in proportion, more important for the short model than for long cable. Finally, refrigeration problems of helium and nitrogen flows, thermal shields and design of refrigerators (optimal capacity and spacing) were solved

  20. 3D Buried Utility Location Using A Marching-Cross-Section Algorithm for Multi-Sensor Data Fusion.

    Science.gov (United States)

    Dou, Qingxu; Wei, Lijun; Magee, Derek R; Atkins, Phil R; Chapman, David N; Curioni, Giulio; Goddard, Kevin F; Hayati, Farzad; Jenks, Hugo; Metje, Nicole; Muggleton, Jennifer; Pennock, Steve R; Rustighi, Emiliano; Swingler, Steven G; Rogers, Christopher D F; Cohn, Anthony G

    2016-11-02

    We address the problem of accurately locating buried utility segments by fusing data from multiple sensors using a novel Marching-Cross-Section (MCS) algorithm. Five types of sensors are used in this work: Ground Penetrating Radar (GPR), Passive Magnetic Fields (PMF), Magnetic Gradiometer (MG), Low Frequency Electromagnetic Fields (LFEM) and Vibro-Acoustics (VA). As part of the MCS algorithm, a novel formulation of the extended Kalman Filter (EKF) is proposed for marching existing utility tracks from a scan cross-section (scs) to the next one; novel rules for initializing utilities based on hypothesized detections on the first scs and for associating predicted utility tracks with hypothesized detections in the following scss are introduced. Algorithms are proposed for generating virtual scan lines based on given hypothesized detections when different sensors do not share common scan lines, or when only the coordinates of the hypothesized detections are provided without any information of the actual survey scan lines. The performance of the proposed system is evaluated with both synthetic data and real data. The experimental results in this work demonstrate that the proposed MCS algorithm can locate multiple buried utility segments simultaneously, including both straight and curved utilities, and can separate intersecting segments. By using the probabilities of a hypothesized detection being a pipe or a cable together with its 3D coordinates, the MCS algorithm is able to discriminate a pipe and a cable close to each other. The MCS algorithm can be used for both post- and on-site processing. When it is used on site, the detected tracks on the current scs can help to determine the location and direction of the next scan line. The proposed "multi-utility multi-sensor" system has no limit to the number of buried utilities or the number of sensors, and the more sensor data used, the more buried utility segments can be detected with more accurate location and orientation.

  1. Research to develop guidelines for cathodic protection of concentric neutral cables, volume 1

    Science.gov (United States)

    Hanck, J. A.; Nekoksa, G.

    1981-08-01

    Data associated with corrosion of concentric neutrals (CN) of direct buried cables from field tests conducted at 36 bellholes excavated in California, Oklahoma, and North Carolina are presented. The electrochemical, chemical, bacteriological, and sieve analyses of native soil and imported backfill samples are included. Up to 129 values were determined for each bellhole and stored on cards as a data bank. All values were statistically analyzed and correlated with corrosion found. The severity of corrosion correlated best with CN corrosion potentials, CN resistance measurements, coarseness of backfill, and soil resistivity. The guidelines for installation of cathodic protection on CN cables are to be based upon the evaluation of over 100 experimental cathodic protection systems and upon laboratory testing for protection criteria with and without ac effects.

  2. Sanford Underground Research Facility - The United State's Deep Underground Research Facility

    Science.gov (United States)

    Vardiman, D.

    2012-12-01

    The 2.5 km deep Sanford Underground Research Facility (SURF) is managed by the South Dakota Science and Technology Authority (SDSTA) at the former Homestake Mine site in Lead, South Dakota. The US Department of Energy currently supports the development of the facility using a phased approach for underground deployment of experiments as they obtain an advanced design stage. The geology of the Sanford Laboratory site has been studied during the 125 years of operations at the Homestake Mine and more recently as part of the preliminary geotechnical site investigations for the NSF's Deep Underground Science and Engineering Laboratory project. The overall geology at DUSEL is a well-defined stratigraphic sequence of schist and phyllites. The three major Proterozoic units encountered in the underground consist of interbedded schist, metasediments, and amphibolite schist which are crosscut by Tertiary rhyolite dikes. Preliminary geotechnical site investigations included drift mapping, borehole drilling, borehole televiewing, in-situ stress analysis, laboratory analysis of core, mapping and laser scanning of new excavations, modeling and analysis of all geotechnical information. The investigation was focused upon the determination if the proposed site rock mass could support the world's largest (66 meter diameter) deep underground excavation. While the DUSEL project has subsequently been significantly modified, these data are still available to provide a baseline of the ground conditions which may be judiciously extrapolated throughout the entire Proterozoic rock assemblage for future excavations. Recommendations for facility instrumentation and monitoring were included in the preliminary design of the DUSEL project design and include; single and multiple point extensometers, tape extensometers and convergence measurements (pins), load cells and pressure cells, smart cables, inclinometers/Tiltmeters, Piezometers, thermistors, seismographs and accelerometers, scanners (laser

  3. Application of EM tomography to detect a buried pipe; EM tomography no maisetsukan tansa eno tekiyorei

    Energy Technology Data Exchange (ETDEWEB)

    Sakashita, S [OYO Corp., Tokyo (Japan)

    1996-10-01

    EM tomography was applied to detect buried pipes. Underground radar exploration method is limited to 10m in depth. Positive use of bored holes is desirable, and in such case, magnetic logging based on the magnetic susceptibility (MS) contrast between buried body and surrounding ground is effective. The primary magnetic field is generated by coil current, and the secondary one is generated by the primary one responding to foreign bodies in the ground. Since the measured primary magnetic field of low frequency within 10Hz can be treated as static magnetic field responding to MS in the ground, it is useful to determine MS distributions. Since the measured magnetic field of high frequency within 100kHz can be treated as induction field responding to conductivity in the ground, it is useful to determine resistivity distributions. The EM tomography which can image both above distributions by using electromagnetic wave in a wide frequency range, was applied to detect buried pipes. The EM tomography could detect an buried foreign body of 3m in diameter at 10m in distance between bored holes. The theoretical equation for analysis was also derived. 5 refs., 9 figs., 1 tab.

  4. An Integrated Environment Monitoring System for Underground Coal Mines—Wireless Sensor Network Subsystem with Multi-Parameter Monitoring

    OpenAIRE

    Zhang, Yu; Yang, Wei; Han, Dongsheng; Kim, Young-Il

    2014-01-01

    Environment monitoring is important for the safety of underground coal mine production, and it is also an important application of Wireless Sensor Networks (WSNs). We put forward an integrated environment monitoring system for underground coal mine, which uses the existing Cable Monitoring System (CMS) as the main body and the WSN with multi-parameter monitoring as the supplementary technique. As CMS techniques are mature, this paper mainly focuses on the WSN and the interconnection between t...

  5. 77 FR 21813 - Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 AMP XI.M41, “Buried and...

    Science.gov (United States)

    2012-04-11

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0055] Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 AMP XI.M41, ``Buried and Underground Piping and Tanks'' AGENCY: Nuclear Regulatory... Guidance (LR-ISG), LR-ISG-2011-03, ``Changes to GALL Report Revision 2 Aging Management Program (AMP) XI...

  6. Does underground storage still require sophisticated studies?

    International Nuclear Information System (INIS)

    Marsily, G. de

    1997-01-01

    Most countries agree to the necessity of burying high or medium-level wastes in geological layers situated at a few hundred meters below the ground level. The advantages and disadvantages of different types of rock such as salt, clay, granite and volcanic material are examined. Sophisticated studies are lead to determine the best geological confinement but questions arise about the time for which safety must be ensured. France has chosen 3 possible sites. These sites are geologically described in the article. The final place will be proposed after a testing phase of about 5 years in an underground facility. (A.C.)

  7. Outages of electric power supply resulting from cable failures Boston Edison Company system

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  8. Monitoring and localization of buried plastic natural gas pipes using passive RF tags

    Science.gov (United States)

    Mondal, Saikat; Kumar, Deepak; Ghazali, Mohd. Ifwat; Chahal, Prem; Udpa, Lalita; Deng, Yiming

    2018-04-01

    A passive harmonic radio frequency (RF) tag on the pipe with added sensing capabilities is proposed in this paper. Radio frequency identification (RFID) based tagging has already emerged as a potential solution for chemical sensing, location detection, animal tagging, etc. Harmonic transponders are already quite popular compared to conventional RFIDs due to their improved signal to noise ratio (SNR). However, the operating frequency, transmitted power and tag efficiency become critical issues for underground RFIDs. In this paper, a comprehensive on-tag sensing, power budget and frequency analyses is performed for buried harmonic tag design. Accurate tracking of infrastructure burial depth is proposed to reduce the probability of failure of underground pipelines. Burial depth is estimated using phase information of received signals at different frequencies calculated using genetic algorithm (GA) based optimization for post processing. Suitable frequency range is determined for a variety of soil with different moisture content for small tag-antenna size. Different types of harmonic tags such as 1) Schottky diode, 2) Non-linear Transmission Line (NLTL) were compared for underground applications. In this study, the power, frequency and tag design have been optimized to achieve small antenna size, minimum signal loss and simple reader circuit for underground detection at up to 5 feet depth in different soil medium and moisture contents.

  9. Research to develop guidelines for cathodic protection of concentric neutral cables, volume 3

    Science.gov (United States)

    Hanck, J. A.; Nekoksa, G.

    1982-08-01

    Data associated with the corrosion of concentric neutral (CN) wires of direct buried primary cables were statistically analyzed, and guidelines for cathodic protection of CN wires for the electric utility industry were developed. The cathodic protection are reported. Field tests conducted at 36 bellholes excavated in California, Oklahoma, and North Carolina are described. Details of the electrochemical, chemical, bacteriological, and sieve analyses of native soil and imported backfill samples are also included.

  10. 200 Area plateau inactive miscellaneous underground storage tanks locations

    International Nuclear Information System (INIS)

    Brevick, C.H.

    1997-01-01

    Fluor Daniel Northwest (FDNW) has been tasked by Lockheed Martin Hanford Corporation (LMHC) to incorporate current location data for 64 of the 200-Area plateau inactive miscellaneous underground storage tanks (IMUST) into the centralized mapping computer database for the Hanford facilities. The IMUST coordinate locations and tank names for the tanks currently assigned to the Hanford Site contractors are listed in Appendix A. The IMUST are inactive tanks installed in underground vaults or buried directly in the ground within the 200-East and 200-West Areas of the Hanford Site. The tanks are categorized as tanks with a capacity of less than 190,000 liters (50,000 gal). Some of the IMUST have been stabilized, pumped dry, filled with grout, or may contain an inventory or radioactive and/or hazardous materials. The IMUST have been out of service for at least 12 years

  11. Radionuclides in an underground environment

    International Nuclear Information System (INIS)

    Thompson, J.L.

    1996-01-01

    In the 100 years since Becquerel recognized radioactivity, mankind has been very successful in producing large amounts of radioactive materials. We have been less successful in reaching a consensus on how to dispose of the billions of curies of fission products and transuranics resulting from nuclear weapons testing, electrical power generation, medical research, and a variety of other human endeavors. Many countries, including the United States, favor underground burial as a means of disposing of radioactive wastes. There are, however, serious questions about how such buried wastes may behave in the underground environment and particularly how they might eventually contaminate water, air and soil resources on which we are dependent. This paper describes research done in the United States in the state of Nevada on the behavior of radioactive materials placed underground. During the last thirty years, a series of ''experiments'' conducted for other purposes (testing of nuclear weapons) have resulted in a wide variety of fission products and actinides being injected in rock strata both above and below the water table. Variables which seem to control the movement of these radionuclides include the physical form (occlusion versus surface deposition), the chemical oxidation state, sorption by mineral phases of the host rock, and the hydrologic properties of the medium. The information gained from these studies should be relevant to planning for remediation of nuclear facilities elsewhere in the world and for long-term storage of nuclear wastes

  12. Uplifting Behavior of Shallow Buried Pipe in Liquefiable Soil by Dynamic Centrifuge Test

    Directory of Open Access Journals (Sweden)

    Bo Huang

    2014-01-01

    Full Text Available Underground pipelines are widely applied in the so-called lifeline engineerings. It shows according to seismic surveys that the damage from soil liquefaction to underground pipelines was the most serious, whose failures were mainly in the form of pipeline uplifting. In the present study, dynamic centrifuge model tests were conducted to study the uplifting behaviors of shallow-buried pipeline subjected to seismic vibration in liquefied sites. The uplifting mechanism was discussed through the responses of the pore water pressure and earth pressure around the pipeline. Additionally, the analysis of force, which the pipeline was subjected to before and during vibration, was introduced and proved to be reasonable by the comparison of the measured and the calculated results. The uplifting behavior of pipe is the combination effects of multiple forces, and is highly dependent on the excess pore pressure.

  13. Uplifting Behavior of Shallow Buried Pipe in Liquefiable Soil by Dynamic Centrifuge Test

    Science.gov (United States)

    Liu, Jingwen; Ling, Daosheng

    2014-01-01

    Underground pipelines are widely applied in the so-called lifeline engineerings. It shows according to seismic surveys that the damage from soil liquefaction to underground pipelines was the most serious, whose failures were mainly in the form of pipeline uplifting. In the present study, dynamic centrifuge model tests were conducted to study the uplifting behaviors of shallow-buried pipeline subjected to seismic vibration in liquefied sites. The uplifting mechanism was discussed through the responses of the pore water pressure and earth pressure around the pipeline. Additionally, the analysis of force, which the pipeline was subjected to before and during vibration, was introduced and proved to be reasonable by the comparison of the measured and the calculated results. The uplifting behavior of pipe is the combination effects of multiple forces, and is highly dependent on the excess pore pressure. PMID:25121140

  14. Uplifting behavior of shallow buried pipe in liquefiable soil by dynamic centrifuge test.

    Science.gov (United States)

    Huang, Bo; Liu, Jingwen; Lin, Peng; Ling, Daosheng

    2014-01-01

    Underground pipelines are widely applied in the so-called lifeline engineerings. It shows according to seismic surveys that the damage from soil liquefaction to underground pipelines was the most serious, whose failures were mainly in the form of pipeline uplifting. In the present study, dynamic centrifuge model tests were conducted to study the uplifting behaviors of shallow-buried pipeline subjected to seismic vibration in liquefied sites. The uplifting mechanism was discussed through the responses of the pore water pressure and earth pressure around the pipeline. Additionally, the analysis of force, which the pipeline was subjected to before and during vibration, was introduced and proved to be reasonable by the comparison of the measured and the calculated results. The uplifting behavior of pipe is the combination effects of multiple forces, and is highly dependent on the excess pore pressure.

  15. Ground Shock Resistant of Buried Nuclear Power Plant Facility

    International Nuclear Information System (INIS)

    Ornai, D.; Adar, A.; Gal, E.

    2014-01-01

    Nuclear Power Plant (NPP) might be subjected to hostile attacks such as Earth Penetrating Weapons (EPW) that carry explosive charges. Explosions of these weapons near buried NPP facility might cause collapse, breaching, spalling, deflection, shear, rigid body motion (depending upon the foundations), and in-structure shock. The occupants and the equipment in the buried facilities are exposed to the in-structure motions, and if they are greater than their fragility values than occupants might be wounded or killed and the equipment might be damaged, unless protective measures will be applied. NPP critical equipment such as pumps are vital for the normal safe operation since it requires constant water circulation between the nuclear reactor and the cooling system, including in case of an immediate shut down. This paper presents analytical- semi empirical formulation and analysis of the explosion of a penetrating weapon with a warhead of 100kgs TNT (Trinitrotoluene) that creates ground shock effect on underground NPP structure containing equipment, such as a typical pump. If the in-structure spectral shock is greater than the pump fragility values than protective measures are required, otherwise a real danger to the NPP safety might occur

  16. Preventing method and device for underground permeation of hazardous material

    International Nuclear Information System (INIS)

    Funabashi, Kiyomi; Kurokawa, Hideaki; Fukazawa, Tetsuo; Yamazaki, Tadashi.

    1996-01-01

    In a method of preventing hazardous materials from permeating into ground by burying adsorbing materials underground, a plurality of adsorbing layers are laminated being spaced apart from each other, the concentration of the hazardous materials between each of the adsorbent layers is measured. When the concentration reaches a predetermined value, the adsorbent layers are regenerated. A suppression means for preventing hazardous materials from permeating into the ground are formed by an upper adsorbent layer and a lower adsorbent layer, and a means for measuring the concentration of hazardous materials passing through the upper adsorbent layer and a means for charging and discharging regenerated liquid are disposed. When it is detected that the poisonous materials can not be eliminated, the poisonous materials are already permeated to the adsorbent layer, and they start to inflow into underground water. In order to prevent it, an adsorbent layer is additionally disposed at the lower side of the place of detection to eliminate the poisonous materials completely thereby enabling to prevent poisonous materials from permeating into underground for a long period of time. (T.M.)

  17. Study of near-source earthquake effects on flexible buried pipes

    Science.gov (United States)

    Davis, Craig Alan

    2000-10-01

    An investigation is carried out, using strong ground motion recordings, field measurements, and new analytical models, on large diameter flexible buried pipes shaken in the 1994 Northridge earthquake near field. Case studies are presented for corrugated metal pipes (CMP) in the Van Norman Complex (VNC) vicinity in Los Angeles, California. In 1994 the VNC yielded an unprecedented number of strong motion recordings with high acceleration and velocity. These recordings contain forward directivity pulses and provided the largest velocity ever instrumentally recorded (180 cm/s). The recorded motions were significantly different in the longitudinal and transverse directions and had approximately half the amplitude at the VNC center than on the north and south ends. The seismic performances of 61 underground CMPs are presented, beginning with detailed studies of a 2.4 m diameter pipe that suffered complete lateral buckling collapse at the Lower San Fernando Dam (LSFD). The case histories identify factors controlling large diameter CMP seismic performances that are incorporated into several newly developed models for the analysis and design of buried structures. Each model progressively improves the understanding of buried pipe behavior. Simple acceleration- and strain-based pseudo-static models are initially developed to identify main causes for CMP damage. Elasto-dynamic models for transverse SV waves are later used to understand flexible pipe response in the frequency and time domains and are compared with existing solutions. Finally, pseudo-static models, which analyze pipe responses in terms of free-field strains, are formulated to account for dynamic amplification, non-vertical wave incidence, soil layering, and trench backfill soil stiffness. The elastic models are used to investigate soil-pipe interface shear stress and non-linear soil behavior and show that the maximum pipe hoop force is best characterized by assuming no interface slippage. The models explain the

  18. Acquiring underground infrastructure's as-built information for cities' sustainability

    International Nuclear Information System (INIS)

    Jaw, S W

    2014-01-01

    The rapid progress of urbanization around the world has lead to an issue of urban land shortage. As such, the urban infrastructure, especially the utilities infrastructure, were buried underground for space saving and better design of urban landscape. However, this has created difficulties in locating these infrastructures from ground surface since they are invisible to the naked eye. Therefore, this paper offers a method to secure as-built information of the underground utility feature without excavation. This is done by utilizing digital image processing, a series of experiments conducted on preferred test site and real model simulation. By securing these underground utilities as-built information, it can contribute to the sustainability of cities through better urban planning. Moreover, the significant findings achieved in this study also eligible to pinpoint that ground penetrating radar (GPR) backscatter with appropritate treatment can yield unique backscatter signature which functional for identification of the types of underground utility without proving excavation. Thereby, good agreement between the backscatter reflections of GPR with respective underground utility not only serves as input which can channelled into a city's planning, but also uncovers the immense potential of GPR backscatter in reporting the ''feature information'' of the objects

  19. Automated Cable Preparation for Robotized Stator Cable Winding

    Directory of Open Access Journals (Sweden)

    Erik Hultman

    2017-04-01

    Full Text Available A method for robotized cable winding of the Uppsala University Wave Energy Converter generator stator has previously been presented and validated. The purpose of this study is to present and validate further developments to the method: automated stand-alone equipment for the preparation of the winding cables. The cable preparation consists of three parts: feeding the cable from a drum, forming the cable end and cutting the cable. Forming and cutting the cable was previously done manually and only small cable drums could be handled. Therefore the robot cell needed to be stopped frequently. The new equipment was tested in an experimental robot stator cable winding setup. Through the experiments, the equipment was validated to be able to perform fully automated and robust cable preparation. Suggestions are also given on how to further develop the equipment with regards to performance, robustness and quality. Hence, this work represents another important step towards demonstrating completely automated robotized stator cable winding.

  20. Non-cable vehicle guidance

    Energy Technology Data Exchange (ETDEWEB)

    Daugela, G.C.; Willott, A.M.; Chopiuk, R.G.; Thornton, S.E.

    1988-06-01

    The purpose is to determine the most promising driverless mine vehicle guidance systems that are not dependent on buried cables, and to plan their development. The project is presented in two phases: a preliminary study and literature review to determine whether suitable technologies exist to justify further work; and an in-depth assessment and selection of technologies for vehicle guidance. A large number of guidance elements are involved in a completely automated vehicle. The technologies that hold the best potential for development of guidance systems for mine vehicles are ultrasonics, radar, lasers, dead reckoning, and guidance algorithms. The best approach to adaptation of these technologies is on a step by step basis. Guidance modules that are complete in themselves and are designed to be integrated with other modules can provide short term benefits. Two modules are selected for development: the dragline operations monitor and automated machine control for optimized mining (AMCOM). 99 refs., 20 figs., 40 tabs.

  1. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Science.gov (United States)

    2010-07-01

    ... portable or mobile equipment from low-voltage three-phase resistance grounded power systems shall contain... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables supplying power to low-voltage... STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Low- and Medium-Voltage...

  2. Lightning simulation of a combined overhead line/cable connected GIS

    DEFF Research Database (Denmark)

    Kessel, Jakob; Atlason, Vioir; Bak, Claus Leth

    2008-01-01

    performance, compared to a system consisting solely of AIS connected thorugh overhead lines. The main purpose is to investigate whether overvoltage protection is necessary at the GIS busbar. Here, the price for a GIS SA is significantly more expensive than the price for an AIS SA. The analysis is conducted......The paper concerns different investigations of lightning simulation of a combined 170 kV overhead line/cable connected GIS. This is interesting due to the increasing amount of underground cables and GIS in the Danish transmission system. This creates a different system with respect to lightning...... by implementing a simulation model in PSCAD/EMTDC. Simulations are conducted for both SF and BFO where the overvoltage at the transformer are evaluated as this component has the lowest insulation strength. The overvoltages are evaluated for different front imes of the lightning surge, different soil resistivities...

  3. Hazard index for underground toxic material

    International Nuclear Information System (INIS)

    Smith, C.F.; Cohen, J.J.; McKone, T.E.

    1980-06-01

    To adequately define the problem of waste management, quantitative measures of hazard must be used. This study reviews past work in the area of hazard indices and proposes a geotoxicity hazard index for use in characterizing the hazard of toxic material buried underground. Factors included in this index are: an intrinsic toxicity factor, formulated as the volume of water required for dilution to public drinking-water levels; a persistence factor to characterize the longevity of the material, ranging from unity for stable materials to smaller values for shorter-lived materials; an availability factor that relates the transport potential for the particular material to a reference value for its naturally occurring analog; and a correction factor to accommodate the buildup of decay progeny, resulting in increased toxicity

  4. Hazard index for underground toxic material

    Energy Technology Data Exchange (ETDEWEB)

    Smith, C.F.; Cohen, J.J.; McKone, T.E.

    1980-06-01

    To adequately define the problem of waste management, quantitative measures of hazard must be used. This study reviews past work in the area of hazard indices and proposes a geotoxicity hazard index for use in characterizing the hazard of toxic material buried underground. Factors included in this index are: an intrinsic toxicity factor, formulated as the volume of water required for dilution to public drinking-water levels; a persistence factor to characterize the longevity of the material, ranging from unity for stable materials to smaller values for shorter-lived materials; an availability factor that relates the transport potential for the particular material to a reference value for its naturally occurring analog; and a correction factor to accommodate the buildup of decay progeny, resulting in increased toxicity.

  5. Full distributed fiber optical sensor for intrusion detection in application to buried pipelines

    Science.gov (United States)

    Gao, Jianzhong; Jiang, Zhuangde; Zhao, Yulong; Zhu, Li; Zhao, Guoxian

    2005-11-01

    Based on the microbend effect of optical fiber, a distributed sensor for real-time continuous monitoring of intrusion in application to buried pipelines is proposed. The sensing element is a long cable with a special structure made up of an elastic polymer wire, an optical fiber, and a metal wire. The damage point is located with an embedded optical time domain reflectometry (OTDR) instrument. The intrusion types can be indicated by the amplitude of output voltage. Experimental results show that the detection system can alarm adequately under abnormal load and can locate the intrusion point within 22.4 m for distance of 3.023 km.

  6. Specialized video systems for use in underground storage tanks

    International Nuclear Information System (INIS)

    Heckendom, F.M.; Robinson, C.W.; Anderson, E.K.; Pardini, A.F.

    1994-01-01

    The Robotics Development Groups at the Savannah River Site and the Hanford site have developed remote video and photography systems for deployment in underground radioactive waste storage tanks at Department of Energy (DOE) sites as a part of the Office of Technology Development (OTD) program within DOE. Figure 1 shows the remote video/photography systems in a typical underground storage tank environment. Viewing and documenting the tank interiors and their associated annular spaces is an extremely valuable tool in characterizing their condition and contents and in controlling their remediation. Several specialized video/photography systems and robotic End Effectors have been fabricated that provide remote viewing and lighting. All are remotely deployable into and from the tank, and all viewing functions are remotely operated. Positioning all control components away from the facility prevents the potential for personnel exposure to radiation and contamination. Overview video systems, both monaural and stereo versions, include a camera, zoom lens, camera positioner, vertical deployment system, and positional feedback. Each independent video package can be inserted through a 100 mm (4 in.) diameter opening. A special attribute of these packages is their design to never get larger than the entry hole during operation and to be fully retrievable. The End Effector systems will be deployed on the large robotic Light Duty Utility Arm (LDUA) being developed by other portions of the OTD-DOE programs. The systems implement a multi-functional ''over the coax'' design that uses a single coaxial cable for all data and control signals over the more than 900 foot cable (or fiber optic) link

  7. Methods to Evaluate Corrosion in Buried Steel Structures: A Review

    Directory of Open Access Journals (Sweden)

    Lorena-de Arriba-Rodriguez

    2018-05-01

    Full Text Available Around the world, there are thousands of metal structures completely or partially buried in the soil. The main concern in their design is corrosion. Corrosion is a mechanism that degrades materials and causes structural failures in infrastructures, which can lead to severe effects on the environment and have direct impact on the population health. In addition, corrosion is extremely complex in the underground environment due to the variability of the local conditions. The problem is that there are many methods to its evaluation but none have been clearly established. In order to ensure the useful life of such structures, engineers usually consider an excess thickness that increases the economic cost of manufacturing and does not satisfy the principles of efficiency in the use of resources. In this paper, an extended revision of the existing methods to evaluate corrosion is carried out to optimize the design of buried steel structures according to their service life. Thus, they are classified into two categories depending on the information they provide: qualitative and quantitative methods. As a result, it is concluded that the most exhaustive methodologies for estimating soil corrosion are quantitative methods fed by non-electrochemical data based on experimental studies that measure the mass loss of structures.

  8. AT on Buried LPG Tanks Over 13 m3: An Innovative and Practical Solution

    Science.gov (United States)

    Di Fratta, Crescenzo; Ferraro, Antonio; Tscheliesnig, Peter; Lackner, Gerald; Correggia, Vincenzo; Altamura, Nicola

    In Italy, since 2005, techniques based on Acoustic Emission have been introduced for testing of underground LPG tanks up to 13 m3, according to the European standard EN 12818:2004. The testing procedure for these tanks plans to install one or more pairs of sensors inside the "dome" suited for the access to the valves and fittings of the tank, directly on the accessible metal shell. This methodology is not applicable for the underground LPG buried tanks, where it is necessary to install a larger number of AE sensors, in order to cover at 100% the whole tank shell, even at very deep positions. Already in 2004, the European standard EN 12820 (Appendix C - Informative)give the possibility to use Acoustic Emission testing of LPG underground or buried tanks with a capacity exceeding 13 m3, but no technique was specified for the application. In 2008, TÜV AUSTRIA ITALIA - BLU SOLUTIONS srl - Italian company of TÜV AUSTRIA Group - has developed a technique to get access at tank shell, where tank capacity is greater than 13 m3 and its' diameter greater than 3,5 m. This methodology was fully in comply with the provisions of the European Standard EN 12819:2010, becoming an innovative solution widely appreciated and is used in Italy since this time. Currently, large companies and petrochemical plants, at the occurrence of the tank's requalification, have engaged TÜV AUSTRIA ITALIA - BLU SOLUTIONS to install such permanent predispositions, which allow access to the tank shell - test object - with diameters from 4 to 8 m. Through this access, you can install the AE sensors needed to cover at 100% the tank surface and then to perform AE test. In an economic crisis period, this technique is proving a valid and practically applicable answer, in order to reduce inspection costs and downtime by offering a technically advanced solution (AT), increasing the safety of the involved operators, protecting natural resources and the environment.

  9. THE INTEREST OF GEOGRAPHICAL INFORMATION, ARTIFICIAL INTELLIGENCE AND VIRTUAL REALITY FOR THE UNDERGROUND NETWORK REPRESENTATION

    Directory of Open Access Journals (Sweden)

    M. Lacroix

    2016-01-01

    Full Text Available Two years ago, 63 people died and more than 150 were seriously injured in Beijing (China because of damage to a hydrocarbon pipeline. Urban networks are invisible because usually buried between 1 and 1,5 meters underground. They should be identified to prevent such accidents which involve workers as well as the public. Rural and urban districts, network concessionaries and contractors: everyone could benefit from their networks becoming safer. To prevent such accidents and protect workers and the public as well, some new regulations propose to identify and secure the buried networks. That’s why it is important to develop a software which deals with the risk management process and also about the risk visualization. This work is structured around three major sections:– the utility of the Geographical Information to determine the minimal distances and the topological relations between the networks themselves, and also with the other element in their vicinity;– the use of some Artificial Intelligence tools, and more particularly of Expert System, to take the current regulation into account and determine the accident risk probability;– the contribution of virtual reality to perceive the underground world.

  10. INEL cold test pit demonstration of improvements in information derived from non-intrusive geophysical methods over buried waste sites

    International Nuclear Information System (INIS)

    1993-01-01

    The objectives of this research project were to lay the foundation for further improvement in the use of geophysical methods for detection of buried wastes, and to increase the information content derived from surveys. Also, an important goal was to move from mere detection to characterization of buried wastes. The technical approach to achieve these objectives consisted of: (1) Collect a data set of high spatial density; (2) Acquire data with multiple sensors and integrate the interpretations inferred from the various sensors; (3) Test a simplified time domain electromagnetic system; and (4) Develop imaging and display formats of geophysical data readily understood by environmental scientists and engineers. The breadth of application of this work is far reaching. Not only are uncontrolled waste pits and trenches, abandoned underground storage tanks, and pipelines found throughout most US DOE facilities, but also at military installations and industrial facilities. Moreover, controlled land disposal sites may contain ''hot spots'' where drums and hazardous material may have been buried. The technologies addressed by the R ampersand D will benefit all of these activities

  11. A novel wavelet-based feature extraction from common mode currents for fault location in a residential DC microgrid

    DEFF Research Database (Denmark)

    Beheshtaein, Siavash; Yu, Junyang; Cuzner, Rob

    2017-01-01

    approaches have been developed that enable construction of scalable microgrids based on PV and battery storage. However, as these systems proliferate, it will be necessary to develop safe and reliable methods for fault protection. Ground faults are of specific concern because, in many cases, cables...... are buried underground. At the same time, microgrids include current monitoring and processing capability wherever an energy resource interfaces to the microgrid through a power electronic converter. This paper discusses methods for identifying ground fault behavior within standard DC microgrid structures...

  12. The Mathematical Modelling of Heat Transfer in Electrical Cables

    Directory of Open Access Journals (Sweden)

    Bugajev Andrej

    2014-05-01

    Full Text Available This paper describes a mathematical modelling approach for heat transfer calculations in underground high voltage and middle voltage electrical power cables. First of the all typical layout of the cable in the sand or soil is described. Then numerical algorithms are targeted to the two-dimensional mathematical models of transient heat transfer. Finite Volume Method is suggested for calculations. Different strategies of nonorthogonality error elimination are considered. Acute triangles meshes were applied in two-dimensional domain to eliminate this error. Adaptive mesh is also tried. For calculations OpenFOAM open source software which uses Finite Volume Method is applied. To generate acute triangles meshes aCute library is used. The efficiency of the proposed approach is analyzed. The results show that the second order of convergence or close to that is achieved (in terms of sizes of finite volumes. Also it is shown that standard strategy, used by OpenFOAM is less efficient than the proposed approach. Finally it is concluded that for solving real problem a spatial adaptive mesh is essential and adaptive time steps also may be needed.

  13. Line Differential Protection Scheme Modelling for Underground 420 kV Cable Systems

    DEFF Research Database (Denmark)

    Sztykiel, Michal; Bak, Claus Leth; Dollerup, Sebastian

    2011-01-01

    Based on the analysis of a specific relay model and an HVAC (High Voltage Alternating Current) cable system, a detailed approach to EMTDC/PSCAD modelling of protective relays is presented. Such approach allows to create complex and accurate relay models derived from the original algorithms. Relay...... models can be applied with various systems, allowing to obtain the most optimal configuration of the protective relaying. The present paper describes modelling methodology on the basis of Siemens SIPROTEC 4 7SD522/610. Relay model was verified experimentally with its real equivalent by both EMTP......-simulated and real world generated current signals connected to the relay....

  14. Line Differential Protection Scheme Modelling for Underground 420 kV Cable Systems

    DEFF Research Database (Denmark)

    Sztykiel, Michal; Bak, Claus Leth; Wiechowski, Wojciech

    2010-01-01

    Based on the analysis of a specific relay model and an HVAC (High Voltage Alternating Current) cable system, a new approach to EMTDC/PSCAD modelling of protective relays is presented. Such approach allows to create complex and accurate relay models derived from the original algorithms. Relay models...... can be applied with various systems, allowing to obtain the most optimal configuration of the protective relaying. The present paper describes modelling methodology on the basis of Siemens SIPROTEC 4 7SD522/610. Relay model was verified experimentally with its real equivalent by both EMTP......-simulated and real world generated current signals connected to the relay....

  15. The buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Kostelnik, K.M.

    1991-01-01

    There are numerous locations throughout the Department of Energy (DOE) Complex where wastes have been buried in the ground or stored for future disposal. Much of this buried waste is contaminated with hazardous and radioactive materials. An extensive research program has been initiated at the Idaho National Engineering Laboratory (INEL) to develop and demonstrate advanced remediation techniques for DOE Complex buried waste. The purpose of the Buried Waste Integrated Demonstration (BWID), is to develop a scientifically sound and deployable remediation system consisting of advanced technologies which address the buried waste characteristics of the DOE Complex. This comprehensive remediation system win include technologies for the entire remediation cycle (cradle-to-grave). Technologies developed and demonstrated within the BWID will be transferred to the DOE Complex sites with buried waste, to private industry, and to universities. Multidirectional technology transfer is encouraged by the BWID. Identification and evaluation of plausible technological solutions are an ongoing activity of the BWID. A number of technologies are currently under development throughout the DOE Complex, private industry, and universities. Technology integration mechanisms have been established by BWID to facilitate collaborative research and demonstration of applicable remedial technologies for buried waste. Successful completion of the BWID will result in the development of a proven and deployable system at the INEL and other DOE Complex buried waste sites, thereby supporting the DOE Complex's environmental restoration objectives

  16. New records of forensic entomofauna in legally buried and exhumed human infants remains in Buenos Aires, Argentina.

    Science.gov (United States)

    Mariani, Roxana; García-Mancuso, Rocío; Varela, Graciela L; Kierbel, Ivana

    2017-11-01

    The study of carrion fauna associated with buried human corpses from a forensic perspective could provide useful information in criminal investigations. Insects and other arthropods remains sampled of 44 legally exhumed infant skeletons from La Plata (Buenos Aires, Argentina). They were identified at different taxonomic levels depending on the state of preservation. The specific diversity, abundance and frequency were analyzed and each taxon was assigned to the hypothetical colonization sequence: burial colonization, post-exhumation contamination at cemetery deposit or soil fauna. The phorid Dohrniphora sp. is mentioned for the first time in Argentina as carrion fauna of underground colonization, and the assemblage of Dohrniphora sp., Megaselia scalaris and Hydrotaea aenescens is proposed as indicator of buried cadavers. These findings provide new useful data to be applied in forensic entomology research. Copyright © 2017 Elsevier Ltd and Faculty of Forensic and Legal Medicine. All rights reserved.

  17. Strategies for managing rival bacterial communities: Lessons from burying beetles.

    Science.gov (United States)

    Duarte, Ana; Welch, Martin; Swannack, Chris; Wagner, Josef; Kilner, Rebecca M

    2018-03-01

    The role of bacteria in animal development, ecology and evolution is increasingly well understood, yet little is known of how animal behaviour affects bacterial communities. Animals that benefit from defending a key resource from microbial competitors are likely to evolve behaviours to control or manipulate the animal's associated external microbiota. We describe four possible mechanisms by which animals could gain a competitive edge by disrupting a rival bacterial community: "weeding," "seeding," "replanting" and "preserving." By combining detailed behavioural observations with molecular and bioinformatic analyses, we then test which of these mechanisms best explains how burying beetles, Nicrophorus vespilloides, manipulate the bacterial communities on their carcass breeding resource. Burying beetles are a suitable species to study how animals manage external microbiota because reproduction revolves around a small vertebrate carcass. Parents shave a carcass and apply antimicrobial exudates on its surface, shaping it into an edible nest for their offspring. We compared bacterial communities in mice carcasses that were either fresh, prepared by beetles or unprepared but buried underground for the same length of time. We also analysed bacterial communities in the burying beetle's gut, during and after breeding, to understand whether beetles could be "seeding" the carcass with particular microbes. We show that burying beetles do not "preserve" the carcass by reducing bacterial load, as is commonly supposed. Instead, our results suggest they "seed" the carcass with bacterial groups which are part of the Nicrophorus core microbiome. They may also "replant" other bacteria from the carcass gut onto the surface of their carrion nest. Both these processes may lead to the observed increase in bacterial load on the carcass surface in the presence of beetles. Beetles may also "weed" the bacterial community by eliminating some groups of bacteria on the carcass, perhaps through

  18. Cable aging tests

    International Nuclear Information System (INIS)

    Hubbard, G.

    1993-01-01

    This paper describes the results from aging, condition monitoring, and loss-of-coolant accident (LOCA) testing of class 1E electrical cables, per NUREG/CR-5772. This test was designed to test the performance of cables which had been aged with simultaneous radiation and thermal exposure. The tested cables included crosslinked polyolefin cables, ethylene propylene rubber cables, and miscellaneous cable types. Cables were exposed to 20, 40, and 60 years equivalent aging, and then exposed to LOCA tests at the end of their qualified life to determine the minimum insulation thickness needed for survival of the test. Failures were found in a large number of the tested cables. As a result the NRC has sent information notices to the industry regarding potential insulation problems. The results have raised the question of whether the artificial aging methods provide adequate testing methods. As a result of this testing the NRC is reviewing the artificial aging procedures, the adequacy of environmental qualification requirements for cable safety, and reexamining data from condition monitoring of installed cables

  19. Buried Waste Integrated Demonstration

    International Nuclear Information System (INIS)

    1994-03-01

    The Buried Waste Integrated Demonstration (BWID) supports the applied research, development, demonstration, and evaluation of a suite of advanced technologies that offer promising solutions to the problems associated with the remediation of buried waste. BWID addresses the difficult remediation problems associated with DOE complex-wide buried waste, particularly transuranic (TRU) contaminated buried waste. BWID has implemented a systems approach to the development and demonstration of technologies that will characterize, retrieve, treat, and dispose of DOE buried wastes. This approach encompasses the entire remediation process from characterization to post-monitoring. The development and demonstration of the technology is predicated on how a technology fits into the total remediation process. To address all of these technological issues, BWID has enlisted scientific expertise of individuals and groups from within the DOE Complex, as well as experts from universities and private industry. The BWID mission is to support development and demonstration of a suite of technologies that, when integrated with commercially-available technologies, forms a comprehensive, remediation system for the effective and efficient remediation of buried waste throughout the DOE Complex. BWID will evaluate and validate demonstrated technologies and transfer this information and equipment to private industry to support the Office of Environmental Restoration (ER), Office of Waste Management (WM), and Office of Facility Transition (FT) remediation planning and implementation activities

  20. Cable line engineering

    International Nuclear Information System (INIS)

    Jang, Hak Sin; Kim, Sin Yeong

    1998-02-01

    This book is about cable line engineering. It is comprised of nine chapters, which deals with summary of cable communication such as way, process of cable communication and optical communication, Line constant of transmission on primary constant, reflection and crosstalk, communication cable line of types like flat cable, coaxial cable and loaded cable, Install of communication line with types and facility of aerial line, construction method of communication line facility, Measurement of communication line, Carrier communication of summary, PCM communication with Introduction, regeneration relay system sampling and quantization and Electric communication service and general information network with mobile communication technique and satellite communication system.

  1. A servo controlled gradient loading triaxial model test system for deep-buried cavern

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Xu-guang [College of Engineering, Ocean University of China, Qingdao 266100 (China); Shandong Provincial Key Laboratory of Ocean Engineering, Qingdao 266100 (China); Research Center of Geotechnical and Structural Engineering, Shandong University, Jinan 250061 (China); Zhang, Qiang-yong; Li, Shu-cai [Research Center of Geotechnical and Structural Engineering, Shandong University, Jinan 250061 (China)

    2015-10-15

    A servo controlled gradient loading model test system is developed to simulate the gradient geostress in deep-buried cavern. This system consists of the gradient loading apparatus, the digital servo control device, and the measurement system. Among them, the gradient loading apparatus is the main component which is used for exerting load onto the model. This loading apparatus is placed inside the counterforce wall/beam and is divided to several different loading zones, with each loading zone independently controlled. This design enables the gradient loading. Hence, the “real” geostress field surrounding the deep-buried cavern can be simulated. The loading or unloading process can be controlled by the human-computer interaction machines, i.e., the digital servo control system. It realizes the automation and visualization of model loading/unloading. In addition, this digital servo could control and regulate hydraulic loading instantaneously, which stabilizes the geostress onto the model over a long term. During the loading procedure, the collision between two adjacent loading platens is also eliminated by developing a guide frame. This collision phenomenon is induced by the volume shrinkage of the model when compressed in true 3D state. In addition, several accurate measurements, including the optical and grating-based method, are adopted to monitor the small deformation of the model. Hence, the distortion of the model could be accurately measured. In order to validate the performance of this innovative model test system, a 3D geomechanical test was conducted on a simulated deep-buried underground reservoir. The result shows that the radial convergence increases rapidly with the release of the stress in the reservoir. Moreover, the deformation increases with the increase of the gas production rate. This observation is consistence with field observation in petroleum engineering. The system is therefore capable of testing deep-buried engineering structures.

  2. A servo controlled gradient loading triaxial model test system for deep-buried cavern.

    Science.gov (United States)

    Chen, Xu-guang; Zhang, Qiang-yong; Li, Shu-cai

    2015-10-01

    A servo controlled gradient loading model test system is developed to simulate the gradient geostress in deep-buried cavern. This system consists of the gradient loading apparatus, the digital servo control device, and the measurement system. Among them, the gradient loading apparatus is the main component which is used for exerting load onto the model. This loading apparatus is placed inside the counterforce wall/beam and is divided to several different loading zones, with each loading zone independently controlled. This design enables the gradient loading. Hence, the "real" geostress field surrounding the deep-buried cavern can be simulated. The loading or unloading process can be controlled by the human-computer interaction machines, i.e., the digital servo control system. It realizes the automation and visualization of model loading/unloading. In addition, this digital servo could control and regulate hydraulic loading instantaneously, which stabilizes the geostress onto the model over a long term. During the loading procedure, the collision between two adjacent loading platens is also eliminated by developing a guide frame. This collision phenomenon is induced by the volume shrinkage of the model when compressed in true 3D state. In addition, several accurate measurements, including the optical and grating-based method, are adopted to monitor the small deformation of the model. Hence, the distortion of the model could be accurately measured. In order to validate the performance of this innovative model test system, a 3D geomechanical test was conducted on a simulated deep-buried underground reservoir. The result shows that the radial convergence increases rapidly with the release of the stress in the reservoir. Moreover, the deformation increases with the increase of the gas production rate. This observation is consistence with field observation in petroleum engineering. The system is therefore capable of testing deep-buried engineering structures.

  3. A servo controlled gradient loading triaxial model test system for deep-buried cavern

    International Nuclear Information System (INIS)

    Chen, Xu-guang; Zhang, Qiang-yong; Li, Shu-cai

    2015-01-01

    A servo controlled gradient loading model test system is developed to simulate the gradient geostress in deep-buried cavern. This system consists of the gradient loading apparatus, the digital servo control device, and the measurement system. Among them, the gradient loading apparatus is the main component which is used for exerting load onto the model. This loading apparatus is placed inside the counterforce wall/beam and is divided to several different loading zones, with each loading zone independently controlled. This design enables the gradient loading. Hence, the “real” geostress field surrounding the deep-buried cavern can be simulated. The loading or unloading process can be controlled by the human-computer interaction machines, i.e., the digital servo control system. It realizes the automation and visualization of model loading/unloading. In addition, this digital servo could control and regulate hydraulic loading instantaneously, which stabilizes the geostress onto the model over a long term. During the loading procedure, the collision between two adjacent loading platens is also eliminated by developing a guide frame. This collision phenomenon is induced by the volume shrinkage of the model when compressed in true 3D state. In addition, several accurate measurements, including the optical and grating-based method, are adopted to monitor the small deformation of the model. Hence, the distortion of the model could be accurately measured. In order to validate the performance of this innovative model test system, a 3D geomechanical test was conducted on a simulated deep-buried underground reservoir. The result shows that the radial convergence increases rapidly with the release of the stress in the reservoir. Moreover, the deformation increases with the increase of the gas production rate. This observation is consistence with field observation in petroleum engineering. The system is therefore capable of testing deep-buried engineering structures

  4. An integrated environment monitoring system for underground coal mines--Wireless Sensor Network subsystem with multi-parameter monitoring.

    Science.gov (United States)

    Zhang, Yu; Yang, Wei; Han, Dongsheng; Kim, Young-Il

    2014-07-21

    Environment monitoring is important for the safety of underground coal mine production, and it is also an important application of Wireless Sensor Networks (WSNs). We put forward an integrated environment monitoring system for underground coal mine, which uses the existing Cable Monitoring System (CMS) as the main body and the WSN with multi-parameter monitoring as the supplementary technique. As CMS techniques are mature, this paper mainly focuses on the WSN and the interconnection between the WSN and the CMS. In order to implement the WSN for underground coal mines, two work modes are designed: periodic inspection and interrupt service; the relevant supporting technologies, such as routing mechanism, collision avoidance, data aggregation, interconnection with the CMS, etc., are proposed and analyzed. As WSN nodes are limited in energy supply, calculation and processing power, an integrated network management scheme is designed in four aspects, i.e., topology management, location management, energy management and fault management. Experiments were carried out both in a laboratory and in a real underground coal mine. The test results indicate that the proposed integrated environment monitoring system for underground coal mines is feasible and all designs performed well as expected.

  5. An Integrated Environment Monitoring System for Underground Coal Mines—Wireless Sensor Network Subsystem with Multi-Parameter Monitoring

    Science.gov (United States)

    Zhang, Yu; Yang, Wei; Han, Dongsheng; Kim, Young-Il

    2014-01-01

    Environment monitoring is important for the safety of underground coal mine production, and it is also an important application of Wireless Sensor Networks (WSNs). We put forward an integrated environment monitoring system for underground coal mine, which uses the existing Cable Monitoring System (CMS) as the main body and the WSN with multi-parameter monitoring as the supplementary technique. As CMS techniques are mature, this paper mainly focuses on the WSN and the interconnection between the WSN and the CMS. In order to implement the WSN for underground coal mines, two work modes are designed: periodic inspection and interrupt service; the relevant supporting technologies, such as routing mechanism, collision avoidance, data aggregation, interconnection with the CMS, etc., are proposed and analyzed. As WSN nodes are limited in energy supply, calculation and processing power, an integrated network management scheme is designed in four aspects, i.e., topology management, location management, energy management and fault management. Experiments were carried out both in a laboratory and in a real underground coal mine. The test results indicate that the proposed integrated environment monitoring system for underground coal mines is feasible and all designs performed well as expected. PMID:25051037

  6. An Integrated Environment Monitoring System for Underground Coal Mines—Wireless Sensor Network Subsystem with Multi-Parameter Monitoring

    Directory of Open Access Journals (Sweden)

    Yu Zhang

    2014-07-01

    Full Text Available Environment monitoring is important for the safety of underground coal mine production, and it is also an important application of Wireless Sensor Networks (WSNs. We put forward an integrated environment monitoring system for underground coal mine, which uses the existing Cable Monitoring System (CMS as the main body and the WSN with multi-parameter monitoring as the supplementary technique. As CMS techniques are mature, this paper mainly focuses on the WSN and the interconnection between the WSN and the CMS. In order to implement the WSN for underground coal mines, two work modes are designed: periodic inspection and interrupt service; the relevant supporting technologies, such as routing mechanism, collision avoidance, data aggregation, interconnection with the CMS, etc., are proposed and analyzed. As WSN nodes are limited in energy supply, calculation and processing power, an integrated network management scheme is designed in four aspects, i.e., topology management, location management, energy management and fault management. Experiments were carried out both in a laboratory and in a real underground coal mine. The test results indicate that the proposed integrated environment monitoring system for underground coal mines is feasible and all designs performed well as expected.

  7. Estudio de la cargabilidad de cables de alta tensión de aislamiento sólido con las variaciones periódicas de la carga; Study of the current capacity of solid insulation high voltage cables with periodical changes of load

    Directory of Open Access Journals (Sweden)

    Juan F Zuñinga

    2011-02-01

    Full Text Available Se plantean los resultados obtenidos al introducir una corrección al método desarrollado en el CIPEL para elcálculo de la cargabilidad de cables soterrados considerando las variaciones periódicas de la curva de cargadiaria y la impedancia compleja del medio que rodea a la instalación a partir del empleo de funciones Bessel yHankel. La validación de la corrección propuesta se realizó mediante el cálculo, con y sin la corrección planteada,de la temperatura superficial de cables en servicio por el método de cálculo propuesto y su comparación conlos medidos en la superficie de dichos cables  This work presents the results obtaines after the introduction of a correction to the method developed in theCIPEL to calculate the current capacity of underground cables considering the periodical chnages of the loadchanges of the daily load curve and the complex impedance of the enviroment sorrounding the installation usingBessel and Hankel funtions.The validity of the proposed correction was carried out calculating the surfacetemperature of the cables in service by means of the calculating method  with and whithout the correction  andthe  comparison of these values with the temperature mesured on the surface of the cables

  8. The Bottom Line: Cable Telegraphy and the Rise of Field Theory in the Victorian British Empire

    Science.gov (United States)

    Hunt, Bruce

    The networks of telegraph wires and undersea cables that began to spread across the world in the 1840s and 1850s had far-reaching effects on commerce and the dissemination of news. They also had deep effects on electrical science. In this paper, I will argue that what might at first appear to be a prime example of pure science--the development of electromagnetic field theory in Britain in the middle decades of the 19th century--was in fact driven in important ways by developments in the telegraph industry, particularly British scientists' and engineers' encounters with puzzling new phenomenon of the `retardation' of signals that turned up on underground wires and undersea cables in the early 1850s.

  9. Online monitoring of Accessories for Underground Electrical Installations through Acoustics Emissions

    Directory of Open Access Journals (Sweden)

    Casals-Torrens P.

    2012-04-01

    Full Text Available The acoustic waves caused by Partial Discharges inside the dielectric materials, can be detected by acoustic emission (AE sensors and analyzed in the time domain. The experimental results presented, show the online detection capability of these sensors in the environment near a cable accessory, such as a splice or terminal. The AE sensors are immune to electromagnetic interference and constitute a detection method non-intrusive and non-destructive, which ensures a galvanic decoupling with respect to electric networks, this technique of partial discharge detection can be applied as a test method for preventive or predictive maintenance (condition-based maintenance to equipments or facilities of medium and high voltage in service and represents an alternative method to electrical detection systems, conventional or not, that continue to rely on the detection of current pulses. This paper presents characterization tests of the sensors AE through comparative tests of partial discharge on accessories for underground power cables.

  10. Superconducting ac cable

    Science.gov (United States)

    Schmidt, F.

    1980-11-01

    The components of a superconducting 110 kV ac cable for power ratings or = 2000 MVA were developed. The cable design is of the semiflexible type, with a rigid cryogenic envelope containing a flexible hollow coaxial cable core. The cable core consists of spirally wound Nb-A1 composite wires electrically insulated by high pressure polyethylene tape wrappings. A 35 m long single phase test cable with full load terminals rated at 110 kV and 10 kA was constructed and successfully tested. The results obtained prove the technical feasibility and capability of this cable design.

  11. Superconducting ac cable

    International Nuclear Information System (INIS)

    Schmidt, F.

    1980-01-01

    The components of a superconducting 110 kV ac cable for power ratings >= 2000 MVA have been developed. The cable design especially considered was of the semiflexible type, with a rigid cryogenic envelope and flexible hollow coaxial cable cores pulled into the former. The cable core consists of spirally wound Nb-Al composite wires and a HDPE-tape wrapped electrical insulation. A 35 m long single phase test cable with full load terminations for 110 kV and 10 kA was constructed and successfully tested. The results obtained prove the technical feasibility and capability of our cable design. (orig.) [de

  12. Static and Dynamic Characteristics of a Long-Span Cable-Stayed Bridge with CFRP Cables

    Directory of Open Access Journals (Sweden)

    Xu Xie

    2014-06-01

    Full Text Available In this study, the scope of CFRP cables in cable-stayed bridges is studied by establishing a numerical model of a 1400-m span of the same. The mechanical properties and characteristics of CFRP stay cables and of a cable-stayed bridge with CFRP cables are here subjected to comprehensive analysis. The anomalies in the damping properties of free vibration, nonlinear parametric vibration and wind fluctuating vibration between steel cables and CFRP cables are determined. The structural stiffness, wind resistance and traffic vibration of the cable-stayed bridge with CFRP cables are also analyzed. It was found that the static performances of a cable-stayed bridge with CFRP cables and steel cables are basically the same. The natural frequencies of CFRP cables do not coincide with the major natural frequencies of the cable-stayed bridge, so the likelihood of CFRP cable-bridge coupling vibration is minuscule. For CFRP cables, the response amplitudes of both parametric vibration and wind fluctuating vibration are smaller than those of steel cables. It can be concluded from the research that the use of CFRP cables does not change the dynamic characteristics of the vehicle-bridge coupling vibration. Therefore, they can be used in long-span cable-stayed bridges with an excellent mechanical performance.

  13. Static and Dynamic Characteristics of a Long-Span Cable-Stayed Bridge with CFRP Cables.

    Science.gov (United States)

    Xie, Xu; Li, Xiaozhang; Shen, Yonggang

    2014-06-23

    In this study, the scope of CFRP cables in cable-stayed bridges is studied by establishing a numerical model of a 1400-m span of the same. The mechanical properties and characteristics of CFRP stay cables and of a cable-stayed bridge with CFRP cables are here subjected to comprehensive analysis. The anomalies in the damping properties of free vibration, nonlinear parametric vibration and wind fluctuating vibration between steel cables and CFRP cables are determined. The structural stiffness, wind resistance and traffic vibration of the cable-stayed bridge with CFRP cables are also analyzed. It was found that the static performances of a cable-stayed bridge with CFRP cables and steel cables are basically the same. The natural frequencies of CFRP cables do not coincide with the major natural frequencies of the cable-stayed bridge, so the likelihood of CFRP cable-bridge coupling vibration is minuscule. For CFRP cables, the response amplitudes of both parametric vibration and wind fluctuating vibration are smaller than those of steel cables. It can be concluded from the research that the use of CFRP cables does not change the dynamic characteristics of the vehicle-bridge coupling vibration. Therefore, they can be used in long-span cable-stayed bridges with an excellent mechanical performance.

  14. Remediating the INEL's buried mixed waste tanks

    International Nuclear Information System (INIS)

    Kuhns, D.J.; Matthern, G.E.; Reese, C.L.

    1996-01-01

    The Idaho National Engineering Laboratory (INEL), formerly the National Reactor Testing Station (NRTS), encompasses 890 square miles and is located in southeast Idaho. In 1949, the United States Atomic Energy Commission, now the Department of Energy (DOE), established the NRTS as a site for the building and testing of nuclear facilities. Wastes generated during the building and testing of these nuclear facilities were disposed within the boundaries of the site. These mixed wastes, containing radionuclides and hazardous materials, were often stored in underground tanks for future disposal. The INEL has 11 buried mixed waste storage tanks regulated under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) ranging in size from 400 to 50,000 gallons. These tanks are constructed of either stainless or carbon steel and are located at 3 distinct geographic locations across the INEL. These tanks have been grouped based on their similarities in an effort to save money and decrease the time required to complete the necessary remediation. Environmental Restoration and Technology Development personnel are teaming in an effort to address the remediation problem systematically

  15. Method to evaluate stress and deformation of small-sized buried pipe induced by wheel loads. Shokokei maisetsukan no rinkaju ni okeru oryoku henkei hyokaho

    Energy Technology Data Exchange (ETDEWEB)

    Tanaka, Y.; Kataoka, T.; Kokusho, T.; Yoshida, Y. (Central Research Institute of Electric Power Industry, Tokyo (Japan))

    1994-03-21

    In order to establish a practical method to evaluate safety of buried pipes, which were generally used as cable-protection pipes, at shallow depth and under vehicle loads, a series of experiments and analyses were performed. Based on the results, a simplified method to evaluate stress and deformation of the buried pipes in pavement were proposed. In the experiments, hard PVC pipes, light steel conduit pipes, and corrugated hard PE pipes in nominal diameters from 75 to 200 mm were applied as specimens for representative flexible pipes, and field load tests in actual size as well as laboratory load tests using soil vessels were carried out. The calculated results by the proposed method were compared to the experimental results, finding that the calculated values gave a satisfactory agreement with measured values which were obtained by the field tests. As a result, it was confirmed that the practical method to evaluate circumferential stresses at the top of pipes and flat-deflection ratios of small-sized buried Pipes induced by wheel loads under various conditions were presented. 20 refs., 17 figs., 6 tabs.

  16. Static and Dynamic Mechanical Properties of Long-Span Cable-Stayed Bridges Using CFRP Cables

    Directory of Open Access Journals (Sweden)

    Mei Kuihua

    2017-01-01

    Full Text Available The elastic modulus and deadweight of carbon fiber-reinforced polymer (CFRP cables are different from those of steel cables. Thus, the static and dynamic behaviors of cable-stayed bridges using CFRP cables are different from those of cable-stayed bridges using steel cables. The static and dynamic performances of the two kinds of bridges with a span of 1000 m were studied using the numerical method. The effects of geometric nonlinear factors on static performance of the two kinds of cable-stayed bridges were analyzed. The live load effects and temperature effects of the two cable-stayed bridges were also analyzed. The influences of design parameters, including different structural systems, the numbers of auxiliary piers, and the space arrangement types of cable, on the dynamic performance of the cable-stayed bridge using CFRP cables were also studied. Results demonstrate that sag effect of the CFRP cable is much smaller than that of steel cable. The temperature effects of CFRP cable-stayed bridge are less than those of steel cable-stayed bridge. The vertical bending natural vibration frequency of the CFRP cable-stayed bridge is generally lower than that of steel cable-stayed bridge, whereas the torsional natural vibration frequency of the former is higher than that of the latter.

  17. On the Minimum Cable Tensions for the Cable-Based Parallel Robots

    Directory of Open Access Journals (Sweden)

    Peng Liu

    2014-01-01

    Full Text Available This paper investigates the minimum cable tension distributions in the workspace for cable-based parallel robots to find out more information on the stability. First, the kinematic model of a cable-based parallel robot is derived based on the wrench matrix. Then, a noniterative polynomial-based optimization algorithm with the proper optimal objective function is presented based on the convex optimization theory, in which the minimum cable tension at any pose is determined. Additionally, three performance indices are proposed to show the distributions of the minimum cable tensions in a specified region of the workspace. An important thing is that the three performance indices can be used to evaluate the stability of the cable-based parallel robots. Furthermore, a new workspace, the Specified Minimum Cable Tension Workspace (SMCTW, is introduced, within which all the minimum tensions exceed a specified value, therefore meeting the specified stability requirement. Finally, a camera robot parallel driven by four cables for aerial panoramic photographing is selected to illustrate the distributions of the minimum cable tensions in the workspace and the relationship between the three performance indices and the stability.

  18. Universal Cable Brackets

    Science.gov (United States)

    Vanvalkenburgh, C.

    1985-01-01

    Concept allows routing easily changed. No custom hardware required in concept. Instead, standard brackets cut to length and installed at selected locations along cable route. If cable route is changed, brackets simply moved to new locations. Concept for "universal" cable brackets make it easy to route electrical cable around and through virtually any structure.

  19. Dynamic Response of Underground Circular Lining Tunnels Subjected to Incident P Waves

    Directory of Open Access Journals (Sweden)

    Hua Xu

    2014-01-01

    Full Text Available Dynamic stress concentration in tunnels and underground structures during earthquakes often leads to serious structural damage. A series solution of wave equation for dynamic response of underground circular lining tunnels subjected to incident plane P waves is presented by Fourier-Bessel series expansion method in this paper. The deformation and stress fields of the whole medium of surrounding rock and tunnel were obtained by solving the equations of seismic wave propagation in an elastic half space. Based on the assumption of a large circular arc, a series of solutions for dynamic stress were deduced by using a wave function expansion approach for a circular lining tunnel in an elastic half space rock medium subjected to incident plane P waves. Then, the dynamic response of the circular lining tunnel was obtained by solving a series of algebraic equations after imposing its boundary conditions for displacement and stress of the circular lining tunnel. The effects of different factors on circular lining rock tunnels, including incident frequency, incident angle, buried depth, rock conditions, and lining stiffness, were derived and several application examples are presented. The results may provide a good reference for studies on the dynamic response and aseismic design of tunnels and underground structures.

  20. Wind-induced cable vibrations and countermeasures of cables of PC cable-stayed bridge. PC syachokyo keburu no kaze ni yoru shindo to sono taisaku

    Energy Technology Data Exchange (ETDEWEB)

    Yoneda, M. (Kawada Industries Inc., Tokyo (Japan))

    1994-05-01

    In recent years, long span of cable-stayed bridges is remarkable. The wind-induced cable vibration called as line vibration and wake galloping was given as an important problem not only in the steel cable-stayed bridges but also in the PC cable-stayed bridges. The technical engineers in design of the cable-stayed bridges have many times to confront the problems on the vibration control of cables, it is considered that sufficient understand of the wind-induced vibration and countermeasures for cables of the PC cable-stayed bridges is necessary. Many reports on the countermeasure examples and trend of vibration control centred on cables of the cable-stayed bridges have been published. In this paper, the wind-induced vibration of cables in the cable-stayed bridges was reviewed, the examples of countermeasures of vibration control on cables in the PC cable-stayed bridges was mainly introduced. The remaining tasks and future prospects on vibration control of the PC cable-stayed bridges were described. 14 refs., 13 figs., 4 tabs.

  1. hree-Dimensional Finite Element Simulation of the Buried Pipe Problem in Geogrid Reinforced Soil

    Directory of Open Access Journals (Sweden)

    Mohammed Yousif Fattah

    2016-05-01

    Full Text Available Buried pipeline systems are commonly used to transport water, sewage, natural oil/gas and other materials. The beneficial of using geogrid reinforcement is to increase the bearing capacity of the soil and decrease the load transfer to the underground structures. This paper deals with simulation of the buried pipe problem numerically by finite elements method using the newest version of PLAXIS-3D software. Rajkumar and Ilamaruthi's study, 2008 has been selected to be reanalyzed as 3D problem because it is containing all the properties needed by the program such as the modulus of elasticity, Poisson's ratio, angle of internal friction. It was found that the results of vertical crown deflection for the model without geogrid obtained from PLAXIS-3D are higher than those obtained by two-dimensional plane strain by about 21.4% while this percent becomes 12.1 for the model with geogrid, but in general, both have the same trend. The two dimensional finite elements analysis predictions of pipe-soil system behavior indicate an almost linear displacement of pipe deflection with applied pressure while 3-D analysis exhibited non-linear behavior especially at higher loads.

  2. Cable aging management

    International Nuclear Information System (INIS)

    Anandkumaran, A.; Sedding, H.

    2012-01-01

    Worldwide, due to the age of the majority of nuclear generating stations significant attention is being paid to the condition of the major components, e.g., reactor, steam generator, turbine generator, transformer, etc., with respect to relicensing and life extension. However, there is recognition that cable systems are critical to the safe, reliable and economic operation of nuclear power plants. Consequently, there is great interest in ageing management of low and medium voltage cables in the nuclear environment. Successful implementation of such programs requires an understanding of how the materials associated with cables and their accessories behave under normal operating and accident conditions. However, there is also a great need to determine the actual condition of the materials and systems in order to make rational decisions on whether or not to replace cables to ensure long term assurance of reliable operation. This proposed contribution describes an approach to cable ageing management of low and medium voltage cables based on measurements of material and electrical properties obtained in the laboratory and in the field. The effectiveness of various chemical, mechanical and electrical test methods are discussed in the context of, • Cable configuration, i.e., low or medium voltage, shielded or unshielded • Material type, i.e., PVC, XLPE, EPR, etc., • Ageing stress, i.e., electrical, thermal, radiation, thermal plus radiation, etc. These factors are key to identifying the most appropriate test method (or methods) to enable understanding of the current condition of the cable. While electrical test methods, e.g., ac withstand testing, partial discharge and various dielectric loss measurement techniques have been found effective for medium voltage cables, they are of very limited use on low voltage cables that constitute the majority of cables in nuclear power plants. This limited effectiveness is due to the lack of a well defined ground plane that is a

  3. Comparison study of cable geometries and superconducting tape layouts for high-temperature superconductor cables

    Science.gov (United States)

    Ta, Wurui; Shao, Tianchong; Gao, Yuanwen

    2018-04-01

    High-temperature superconductor (HTS) rare-earth-barium-copper-oxide (REBCO) tapes are very promising for use in high-current cables. The cable geometry and the layout of the superconducting tapes are directly related to the performance of the HTS cable. In this paper, we use numerical methods to perform a comparison study of multiple-stage twisted stacked-tape cable (TSTC) conductors to find better cable structures that can both improve the critical current and minimize the alternating current (AC) losses of the cable. The sub-cable geometry is designed to have a stair-step shape. Three superconducting tape layouts are chosen and their transport performance and AC losses are evaluated. The magnetic field and current density profiles of the cables are obtained. The results show that arrangement of the superconducting tapes from the interior towards the exterior of the cable based on their critical current values in descending order can enhance the cable's transport capacity while significantly reducing the AC losses. These results imply that cable transport capacity improvements can be achieved by arranging the superconducting tapes in a manner consistent with the electromagnetic field distribution. Through comparison of the critical currents and AC losses of four types of HTS cables, we determine the best structural choice among these cables.

  4. Cable Supported Bridges

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    Cable supported bridges in the form of suspension bridges and cable-stayed bridges are distinguished by their ability to overcome large spans.The book concentrates on the synthesis of cable supported bridges, covering both design and construction aspects. The analytical part covers simple methods...... to quantify the different structural configurations and allows a preliminary optimization of the main structure.Included are the most recent advances in structural design, corrosion protection of cables, aerodynamic safety, and erection procedures....

  5. Buried Craters of Utopia

    Science.gov (United States)

    2003-01-01

    MGS MOC Release No. MOC2-365, 19 May 2003Beneath the northern plains of Mars are numerous buried meteor impact craters. One of the most heavily-cratered areas, although buried, occurs in Utopia Planitia, as shown in this Mars Global Surveyor (MGS) Mars Orbiter Camera (MOC) image. The history of Mars is complex; impact craters provide a tool by which to understand some of that history. In this case, a very ancient, cratered surface was thinly-buried by younger material that is not cratered at all. This area is near 48.1oN, 228.2oW; less than 180 km (112 mi) west of the Viking 2 lander site. Sunlight illuminates the scene from the lower left.

  6. Parametrically excited oscillation of stay cable and its control in cable-stayed bridges.

    Science.gov (United States)

    Sun, Bing-nan; Wang, Zhi-gang; Ko, J M; Ni, Y Q

    2003-01-01

    This paper presents a nonlinear dynamic model for simulation and analysis of a kind of parametrically excited vibration of stay cable caused by support motion in cable-stayed bridges. The sag, inclination angle of the stay cable are considered in the model, based on which, the oscillation mechanism and dynamic response characteristics of this kind of vibration are analyzed through numerical calculation. It is noted that parametrically excited oscillation of a stay cable with certain sag, inclination angle and initial static tension force may occur in cable-stayed bridges due to deck vibration under the condition that the natural frequency of a cable approaches to about half of the first model frequency of the bridge deck system. A new vibration control system installed on the cable anchorage is proposed as a possible damping system to suppress the cable parametric oscillation. The numerical calculation results showed that with the use of this damping system, the cable oscillation due to the vibration of the deck and/or towers will be considerably reduced.

  7. Magnet cable manufacturing

    International Nuclear Information System (INIS)

    Royet, J.

    1985-07-01

    The superconducting magnets used in the construction of particle accelerators are mostly built from flat, multistrand cables with rectangular or keystoned cross sections. The superconducting strands are mostly circular but a design of a cable made of preflattened wires was proposed a few years ago under the name of Berkeley flat; such cable shows some interesting characteristics. Another design consists of a few smaller precabled wires (e.g. 6 around 1). This configuration allows smaller filaments and a better transposition of the current elements. The Superconducting Super Collider project involves the largest amount of superconducting cable ever envisaged for a single machine. Furthermore, the design calls for exceptional accuracy and improved characteristics of the cable. A part of the SSC research and development program is focused on these important questions. In this paper we emphasize the difference between the conventional cabling and wires with superconducting. A new concept for the tooling will be introduced as well as the necessary characteristics of a specialized cabler. 5 figs

  8. Cable strengthened arches

    NARCIS (Netherlands)

    Kamerling, M.W.

    2013-01-01

    The structural efficiency of arches, subjected to several variable loads, can be increased by strengthening these arches with cables. For these structures it can be necessary, especially in case the permanent load is small, to post-tension the cables to avoid any compression acting on the cables. A

  9. A new multiconstraint method for determining the optimal cable stresses in cable-stayed bridges.

    Science.gov (United States)

    Asgari, B; Osman, S A; Adnan, A

    2014-01-01

    Cable-stayed bridges are one of the most popular types of long-span bridges. The structural behaviour of cable-stayed bridges is sensitive to the load distribution between the girder, pylons, and cables. The determination of pretensioning cable stresses is critical in the cable-stayed bridge design procedure. By finding the optimum stresses in cables, the load and moment distribution of the bridge can be improved. In recent years, different research works have studied iterative and modern methods to find optimum stresses of cables. However, most of the proposed methods have limitations in optimising the structural performance of cable-stayed bridges. This paper presents a multiconstraint optimisation method to specify the optimum cable forces in cable-stayed bridges. The proposed optimisation method produces less bending moments and stresses in the bridge members and requires shorter simulation time than other proposed methods. The results of comparative study show that the proposed method is more successful in restricting the deck and pylon displacements and providing uniform deck moment distribution than unit load method (ULM). The final design of cable-stayed bridges can be optimised considerably through proposed multiconstraint optimisation method.

  10. Nonlinear Analysis of Cable Vibration of a Multispan Cable-Stayed Bridge under Transverse Excitation

    Directory of Open Access Journals (Sweden)

    Kun Lin

    2014-01-01

    Full Text Available The nonlinear vibrations of cable in a multispan cable-stayed bridge subjected to transverse excitation are investigated. The MECS (multielements cable system model, where multielements per cable stay are used, is built up and used to analyze the model properties of the multispan cable-stayed bridges. Then, a simplified two-degrees-of-freedom (2-DOFs model, where the tower or the deck is reduced to a beam, is proposed to analyze the nonlinear dynamic behaviors of the beam and cable. The results of MECS model analysis show that the main tower in the multispan cable-stayed bridge is prone to the transverse vibration, and the local vibration of cables only has a little impact on the frequency values of the global modes. The results of simplified model analysis show that the energy can be transformed between the modes of the beam and cable when the nature frequencies of them are very close. On the other hand, with the transverse excitation changing, the cable can exhibit richer quasi-periodic or chaotic motions due to the nonlinear terms caused by the coupled mode between the beam and cable.

  11. A New Multiconstraint Method for Determining the Optimal Cable Stresses in Cable-Stayed Bridges

    Directory of Open Access Journals (Sweden)

    B. Asgari

    2014-01-01

    Full Text Available Cable-stayed bridges are one of the most popular types of long-span bridges. The structural behaviour of cable-stayed bridges is sensitive to the load distribution between the girder, pylons, and cables. The determination of pretensioning cable stresses is critical in the cable-stayed bridge design procedure. By finding the optimum stresses in cables, the load and moment distribution of the bridge can be improved. In recent years, different research works have studied iterative and modern methods to find optimum stresses of cables. However, most of the proposed methods have limitations in optimising the structural performance of cable-stayed bridges. This paper presents a multiconstraint optimisation method to specify the optimum cable forces in cable-stayed bridges. The proposed optimisation method produces less bending moments and stresses in the bridge members and requires shorter simulation time than other proposed methods. The results of comparative study show that the proposed method is more successful in restricting the deck and pylon displacements and providing uniform deck moment distribution than unit load method (ULM. The final design of cable-stayed bridges can be optimised considerably through proposed multiconstraint optimisation method.

  12. Failure analysis of buried tanks

    International Nuclear Information System (INIS)

    Watkins, R.K.

    1994-01-01

    Failure of a buried tank can be hazardous. Failure may be a leak through which product is lost from the tank; but also through which contamination can occur. Failures are epidemic -- because buried tanks are out of sight, but also because designers of buried tanks have adopted analyses developed for pressure tanks. So why do pressure tanks fail when they are buried? Most failures of buried tanks are really soil failures. Soil compresses, or slips, or liquefies. Soil is not only a load, it is a support without which the tank deforms. A high water table adds to the load on the tank. It also reduces the strength of the soil. Based on tests, structural analyses are proposed for empty tanks buried in soils of various quality, with the water table at various levels, and with internal vacuum. Failure may be collapse tank. Such collapse is a sudden, audible inversion of the cylinder when the sidefill soil slips. Failure may be flotation. Failure may be a leak. Most leaks are fractures in the welds in overlap seams at flat spots. Flat spots are caused by a hard bedding or a heavy surface wheel load. Because the tank wall is double thick at the overlap, shearing stress in the weld is increased. Other weld failures occur when an end plate shears down past a cylinder; or when the tank is supported only at its ends like a beam. These, and other, failures can be analyzed with justifiable accuracy using basic principles of mechanics of materials. 10 figs

  13. An efficient approach to imaging underground hydraulic networks

    Science.gov (United States)

    Kumar, Mohi

    2012-07-01

    To better locate natural resources, treat pollution, and monitor underground networks associated with geothermal plants, nuclear waste repositories, and carbon dioxide sequestration sites, scientists need to be able to accurately characterize and image fluid seepage pathways below ground. With these images, scientists can gain knowledge of soil moisture content, the porosity of geologic formations, concentrations and locations of dissolved pollutants, and the locations of oil fields or buried liquid contaminants. Creating images of the unknown hydraulic environments underfoot is a difficult task that has typically relied on broad extrapolations from characteristics and tests of rock units penetrated by sparsely positioned boreholes. Such methods, however, cannot identify small-scale features and are very expensive to reproduce over a broad area. Further, the techniques through which information is extrapolated rely on clunky and mathematically complex statistical approaches requiring large amounts of computational power.

  14. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  15. Simulation of the cabling process for Rutherford cables: An advanced finite element model

    Science.gov (United States)

    Cabanes, J.; Garlasche, M.; Bordini, B.; Dallocchio, A.

    2016-12-01

    In all existing large particle accelerators (Tevatron, HERA, RHIC, LHC) the main superconducting magnets are based on Rutherford cables, which are characterized by having: strands fully transposed with respect to the magnetic field, a significant compaction that assures a large engineering critical current density and a geometry that allows efficient winding of the coils. The Nb3Sn magnets developed in the framework of the HL-LHC project for improving the luminosity of the Large Hadron Collider (LHC) are also based on Rutherford cables. Due to the characteristics of Nb3Sn wires, the cabling process has become a crucial step in the magnet manufacturing. During cabling the wires experience large plastic deformations that strongly modify the geometrical dimensions of the sub-elements constituting the superconducting strand. These deformations are particularly severe on the cable edges and can result in a significant reduction of the cable critical current as well as of the Residual Resistivity Ratio (RRR) of the stabilizing copper. In order to understand the main parameters that rule the cabling process and their impact on the cable performance, CERN has developed a 3D Finite Element (FE) model based on the LS-Dyna® software that simulates the whole cabling process. In the paper the model is presented together with a comparison between experimental and numerical results for a copper cable produced at CERN.

  16. DC Cable for Railway

    Science.gov (United States)

    Tomita, Masaru

    The development of a superconducting cable for railways has commenced, assuming that a DC transmission cable will be used for electric trains. The cable has been fabricated based on the results of current testing of a superconducting wire, and various evaluation tests have been performed to determine the characteristics of the cable. A superconducting transmission cable having zero electrical resistance and suitable for railway use is expected to enhance regeneration efficiency, reduce power losses, achieve load leveling and integration of sub-stations, and reduce rail potential.

  17. Application of subset simulation in reliability estimation of underground pipelines

    International Nuclear Information System (INIS)

    Tee, Kong Fah; Khan, Lutfor Rahman; Li, Hongshuang

    2014-01-01

    This paper presents a computational framework for implementing an advanced Monte Carlo simulation method, called Subset Simulation (SS) for time-dependent reliability prediction of underground flexible pipelines. The SS can provide better resolution for low failure probability level of rare failure events which are commonly encountered in pipeline engineering applications. Random samples of statistical variables are generated efficiently and used for computing probabilistic reliability model. It gains its efficiency by expressing a small probability event as a product of a sequence of intermediate events with larger conditional probabilities. The efficiency of SS has been demonstrated by numerical studies and attention in this work is devoted to scrutinise the robustness of the SS application in pipe reliability assessment and compared with direct Monte Carlo simulation (MCS) method. Reliability of a buried flexible steel pipe with time-dependent failure modes, namely, corrosion induced deflection, buckling, wall thrust and bending stress has been assessed in this study. The analysis indicates that corrosion induced excessive deflection is the most critical failure event whereas buckling is the least susceptible during the whole service life of the pipe. The study also shows that SS is robust method to estimate the reliability of buried pipelines and it is more efficient than MCS, especially in small failure probability prediction

  18. Cable laying methods in a multi-cable elevator system

    Energy Technology Data Exchange (ETDEWEB)

    Dvornikov, V.I.; Makhinyan, V.V.

    1984-01-01

    Based on the solution of differential equations describing the stress and deformation state of cables during rolling on the drum, a conclusion is made concerning a rational method for hanging cables with a free-spinning end.

  19. Stray current induced corrosion in lightning rod cables of 525 kV power lines towers: a case study

    OpenAIRE

    Wojcicki, F. R.; Negrisoli, M. E. M.; Franco, C. V.

    2003-01-01

    With the growth of several areas in modem society, the necessity to generate and carry electrical energy to big cities has greatly increased. Cables supported by power towers with galvanized steel foundation usually carry energy. As the foundations are underground they may cause high rates of corrosion. These are usually detected by a conventional potential measurement using a Cu/CuSO4 reference electrode. It is believed that corrosion results from stray currents that f...

  20. Condition based maintenance of a 20 kV-PE/XLPE-insulated cable network using the IRC-Analysis; Zustandsorientierte Instandhaltung eines polymerisolierten 20-kV-Kabelnetzes mit der IRC-Analyse. Moderne Diagnostik reduziert Stoerungsrate

    Energy Technology Data Exchange (ETDEWEB)

    Hoff, G.; Kranz, H.G. [BUGH Wuppertal (Germany). Labs. fuer Hochspannungstechnik; Beigert, M.; Petzold, F. [Seba Dynatronic Mess- und Ortungstechnik GmbH, Baunach (Germany); Kneissl, C. [Bereich Konzeption und Messtechnik, Lech Elektrizitaetswerke AG, Augsburg (Germany)

    2001-10-22

    For a preventive maintenance of a polymer insulated cable network a destruction free estimation of the status of the buried PE/XLPE-cables is needed. This contribution presents a condition based maintenance concept which is based on the IRC-Analysis. With this concept a major German utility was able to reduce the amount of failures in a part of the 20kV-cable network. The general tendency of increasing faults was broken. (orig.) [German] Die praeventive Instandhaltung in polymerisolierten Kabelnetzen setzt eine zerstoerungsfreie Zustandbestimmung von gelegten PE/VPE-isolierten Kabeln voraus. Die-Verfasser beschreiben ein zustandsorientiertes Wartungskonzept auf Basis der IRC-Analyse, mit dem es gelungen ist, in einem Teil des 20-kV-Kabelnetzes eines Energieversorgers die in der Vergangenheit stetig steigende Stoerungsrate drastisch zu reduzieren. (orig.)

  1. Heat transfer analysis of underground U-type heat exchanger of ground source heat pump system.

    Science.gov (United States)

    Pei, Guihong; Zhang, Liyin

    2016-01-01

    Ground source heat pumps is a building energy conservation technique. The underground buried pipe heat exchanging system of a ground source heat pump (GSHP) is the basis for the normal operation of an entire heat pump system. Computational-fluid-dynamics (CFD) numerical simulation software, ANSYS-FLUENT17.0 have been performed the calculations under the working conditions of a continuous and intermittent operation over 7 days on a GSHP with a single-well, single-U and double-U heat exchanger and the impact of single-U and double-U buried heat pipes on the surrounding rock-soil temperature field and the impact of intermittent operation and continuous operation on the outlet water temperature. The influence on the rock-soil temperature is approximately 13 % higher for the double-U heat exchanger than that of the single-U heat exchanger. The extracted energy of the intermittent operation is 36.44 kw·h higher than that of the continuous mode, although the running time is lower than that of continuous mode, over the course of 7 days. The thermal interference loss and quantity of heat exchanged for unit well depths at steady-state condition of 2.5 De, 3 De, 4 De, 4.5 De, 5 De, 5.5 De and 6 De of sidetube spacing are detailed in this work. The simulation results of seven working conditions are compared. It is recommended that the side-tube spacing of double-U underground pipes shall be greater than or equal to five times of outer diameter (borehole diameter: 180 mm).

  2. TNX Burying Ground: Environmental information document

    International Nuclear Information System (INIS)

    Dunaway, J.K.W.; Johnson, W.F.; Kingley, L.E.; Simmons, R.V.; Bledsoe, H.W.

    1987-03-01

    The TNX Burying Ground, located within the TNX Area of the Savannah River Plant (SRP), was originally built to dispose of debris from an experimental evaporator explosion at TNX in 1953. This evaporator contained approximately 590 kg of uranyl nitrate. From 1980 to 1984, much of the waste material buried at TNX was excavated and sent to the SRP Radioactive Waste Burial Grounds for reburial. An estimated 27 kg of uranyl nitrate remains buried at TNX. The TNX Burying Ground consists of three sites known to contain waste and one site suspected of containing waste material. All four sites are located within the TNX security fenceline. Groundwater at the TNX Burying Ground was not evaluated because there are no groundwater monitoring wells installed in the immediate vicinity of this waste site. The closure options considered for the TNX Burying Ground are waste removal and closure, no waste removal and closure, and no action. The predominant pathways for human exposure to chemical and/or radioactive constituents are through surface, subsurface, and atmospheric transport. Modeling calculations were made to determine the risks to human population via these general pathways for the three postulated closure options. An ecological assessment was conducted to predict the environmental impacts on aquatic and terrestrial biota. The relative costs for each of the closure options were estimated

  3. The Blackfoot 111 buried geophone experiment

    Energy Technology Data Exchange (ETDEWEB)

    Cieslewicz, D.; Lawton, D.C. [Calgary Univ., AB (Canada). Dept. of Geology and Geophysics

    1999-07-01

    As an important difference between a VSP and a conventional survey is the presence of the near-surface layer in the latter, it is possible that overburden materials are particularly attenuative to shear waves, causing an observed narrower bandwidth of converted waves in a seismic experiment conducted in the Blackfoot oil field. The Blackfoot III buried geophone experiment tested this hypothesis by recording data with three component geophones buried to various depths in the near surface. By avoiding a portion of the near surface, buried geophones might avoid a certain amount of attenuation, resulting in a better bandwidth and hence vertical resolution for P-S reflections in particular. Accessory seismic studies of near-surface velocity and impedance were made using the buried geophone data, made possible by the unique geometry of the experiment. The P-P processed data had comparable data quality at all geophone depths, whereas the processed surface P-S data had superior quality over data from the buried phones. This was a result of greater amounts of mode leakage and lower raw reflection amplitudes in the buried phones. No systematic improvement in P-S or P-P reflection bandwidth was noted for deeper geophones; inconsistent geophone coupling was partly a factor in this observation. Raw reflection amplitudes through the near surface are controlled mainly by the impedance of near-surface sediments. Near-surface velocities are typical for unconsolidated overburden for the western 2/3 of the buried receiver line, but increases to values more typical of unweathered bedrock for the eastern 1/3. This probably shows a thinning of the overburden layer in this area. 2 refs.

  4. Application study on the first cable-stayed bridge with CFRP cables in China

    Directory of Open Access Journals (Sweden)

    Kuihua Mei

    2015-08-01

    Full Text Available In order to push forward the development of CFRP cable-stayed bridge and accumulate experiences, the study on the application of the first cable-stayed bridge with CFRP cables in China was carried out. The design essentials of main components of the bridge were introduced and its integral performances, including static properties, dynamic properties and seismic response were analyzed using finite element method. A new bond-type anchorage was developed and the processes of fabricating and installing CFRP cables were elaborated. Based on the results of construction simulation, a tension scheme for bridge was propound. During constructing, the stresses and displacement of girder and pylon, as well as the forces and stresses of cables, were tested. The results indicate that all sections of the bridge could meet the requirements of the ultimate bearing capacity and normal service; the performance of the anchorage is good and the stresses in each cable system are similar; the tested values accord well with the calculated values. Further, creep deformation of the resin in anchorages under service load is not obvious. All these results demonstrate that the first application of CFRP cables in the cable-stayed bridge in China is successful.

  5. Cable support arrangements

    International Nuclear Information System (INIS)

    Pendleton, E.; Murray, A.

    1983-01-01

    A cable support arrangement extending from a refuelling level floor of a nuclear reactor to the inner shield of a double rotatable shield comprises a linearly extensible cable support and disciplining boom, reaching from the floor to the main shield, and a circumferentially extensible cable support and disciplining means running from the end of the boom to a fixed end on the inner shield. (author)

  6. 30 CFR 7.407 - Test for flame resistance of electric cables and cable splices.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Test for flame resistance of electric cables... Electric Cables, Signaling Cables, and Cable Splice Kits § 7.407 Test for flame resistance of electric... material and 21/2 inches of conductor insulation. The type, amperage, voltage rating, and construction of...

  7. Remote technologies for buried waste retrieval

    International Nuclear Information System (INIS)

    Smith, A.M.; Rice, P.

    1995-01-01

    The DOE is evaluating what should be done with this buried waste. Although the radioactive waste is not particularly mobile unless airborne, some of it was buried with volatile organics and/or other substances that tend to spread easily to surrounding soil or water tables. Volatile organics are hazardous materials (such as trichloroethylene) and require clean-up at certain levels in drinking water. There is concern that the buried volatile organics will spread into the water table and contaminate drinking water. Because of this, the DOE is considering options for handling this buried waste and reducing the risks of spreading or exposure. There are two primary options: containment and stabilization, or retrieval. Containment and stabilization systems would include systems that would leave the waste where it is, but contain and stabilize it so that the radioactive and hazardous materials would not spread to the surrounding soil, water, or air. For example, an in situ vitrification system could be used to melt the waste into a composite glass-like material that would not leach into the surrounding soil, water, or air. Retrieval systems are those that would remove the waste from its burial location for treatment and/or repackaging for long term storage. The objective of this project was to develop and demonstrate remote technologies that would minimize dust generation and the spread of airborne contaminants during buried waste retrieval. Remote technologies are essential for the retrieval of buried waste because they remove workers from the hazardous environment and provide greater automation, reducing the chances of human error. Minimizing dust generation is also essential to increased safety for the workers and the environment during buried waste retrieval. The main contaminants within the waste are micron-sized particles of plutonium and americium oxides, chlorides, and hydroxides, which are easily suspended in air and spread if disturbed

  8. COPPER CABLE RECYCLING TECHNOLOGY

    International Nuclear Information System (INIS)

    Chelsea Hubbard

    2001-01-01

    The United States Department of Energy (DOE) continually seeks safer and more cost-effective technologies for use in deactivation and decommissioning (D and D) of nuclear facilities. The Deactivation and Decommissioning Focus Area (DDFA) of the DOE's Office of Science and Technology (OST) sponsors large-scale demonstration and deployment projects (LSDDPs). At these LSDDPs, developers and vendors of improved or innovative technologies showcase products that are potentially beneficial to the DOE's projects and to others in the D and D community. Benefits sought include decreased health and safety risks to personnel and the environment, increased productivity, and decreased costs of operation. The Idaho National Engineering and Environmental Laboratory (INEEL) generated a list of statements defining specific needs and problems where improved technology could be incorporated into ongoing D and D tasks. One such need is to reduce the volume of waste copper wire and cable generated by D and D. Deactivation and decommissioning activities of nuclear facilities generates hundreds of tons of contaminated copper cable, which are sent to radioactive waste disposal sites. The Copper Cable Recycling Technology separates the clean copper from contaminated insulation and dust materials in these cables. The recovered copper can then be reclaimed and, more importantly, landfill disposal volumes can be reduced. The existing baseline technology for disposing radioactively contaminated cables is to package the cables in wooden storage boxes and dispose of the cables in radioactive waste disposal sites. The Copper Cable Recycling Technology is applicable to facility decommissioning projects at many Department of Energy (DOE) nuclear facilities and commercial nuclear power plants undergoing decommissioning activities. The INEEL Copper Cable Recycling Technology Demonstration investigated the effectiveness and efficiency to recycle 13.5 tons of copper cable. To determine the effectiveness

  9. NRC Information Notice No. 92-01: Cable damage caused by inadequate cable installation procedures and controls

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1993-01-01

    In June 1989, the Tennessee Valley Authority (TVA) removed the cables from a conduit in the reactor protection system of the Watts Bar Nuclear Plant, Unit 2, to inspect for damage. TVA selected this conduit in response to an employee's concern that a welding arc that struck the conduit in response to an employee's concern that a welding arc that struck the conduit during construction may have damaged cables in the conduit. When the cables were removed, TVA found significant damage in the insulation of some cables. This damage was not attributed to heat generated by the alleged welding arc. The damage was principally attributed to the pulling stresses exerted during the initial installation of the cables. Some of the cables had insulation removed down to the conductors. To assess the extent of cable damage and determine the scope of its investigation, TVA removed more cables from conduits that constituted the most difficult pulls (worst case) and found varying degrees of damage that it attributed to pulling stresses. To fill a conduit at Watts Bar, personnel used pull cords to pull more cables through the conduits over the top of existing cables. This practice is called ''pull-by.'' This practice can cause damage to the existing cables from the sawing action of the pull cords and the friction of cables as they are pulled over existing cables. TVA instituted programs to assess the adequacy of cable installation at all its nuclear facilities and take appropriate corrective actions. At Watts Bar, TVA replaced cables in conduits which exceeded a calculated threshold value of side wall bearing pressure (SWBP) and performed a high-potential (hi-pot) tests on a number of other cables in conduits with SWBP below the calculated threshold value

  10. Energy cable engineering. Energiekabeltechnik

    Energy Technology Data Exchange (ETDEWEB)

    Luecking, H W

    1981-01-01

    This textbook intends to explain cable elements and common cable constructions according to VDE, and in a second part, to review the theoretical fundamentals and their consequences with a view to the construction of cables for higher voltages and powers. It will give the student a picture of the variety of problems and solutions which make cable engineering so interesting and show the practising engineer how to derive a theoretical system from their extensive everyday experience.

  11. Landing Marine-derived Renewable Energy: Optimising Power Cable Routing in the Nearshore Environment

    Science.gov (United States)

    Turner, Rosalind, ,, Dr.; Keane, Tom; Mullins, Brian; Phipps, Peter

    2010-05-01

    Numerous studies have demonstrated that a vast unexploited source of energy can be derived from the marine environment. Recent evolution of the energy market and looming EU renewable energy uptake targets for 2020 have driven a huge explosion of interest in exploiting this resource, triggering both governments and industry to move forward in undertaking feasibility assessments and demonstration projects for wave, tidal and offshore wind farms across coastlines. The locations which naturally lend themselves to high yield energy capture, are by definition, exposed and may be remote, located far from the end user of the electricity generated. A fundamental constraint to successfully exploiting these resources will be whether electricity generated in high energy, variable and constantly evolving environments can be brought safely and reliably to shore without the need for constant monitoring and maintenance of the subsea cables and landfall sites. In the case of riverine cable crossings superficial sediments would typically be used to trench and bury the cable. High energy coastal environments may be stripped of soft sediments. Any superficial sediments present at the site may be highly mobile and subject to re-suspension throughout the tidal cycle or under stormy conditions. EirGrid Plc. and Mott MacDonald Ireland Ltd. have been investigating the potential for routing a cable across the exposed Shannon estuary in Ireland. Information regarding the geological ground model, meteo-oceanographic and archaeological conditions of the proposed site was limited, necessitating a clear investigation strategy. The investigation included gathering site information on currents, bathymetry and geology through desk studies, hydrographic and geophysical surveys, an intrusive ground investigation and coastal erosion assessments at the landfall sites. The study identified a number of difficulties for trenching and protecting a cable through an exposed environment such as the Shannon

  12. Study on the overcurrent character analysis and its protective system of underground LV distribution networks

    Energy Technology Data Exchange (ETDEWEB)

    Song, J.; Shi, Z.; Yang, Y.; Shi, W.; Wei, H.; Zhai, S.; Xie, H. [Taiyuan University of Technology, Taiyuan (China)

    2001-02-01

    The overcurrent fault characteristics in underground LV cable distribution networks is analysed and the fundamental principle of overcurrent protective system is described in this paper. The emphasis is paid to the determination of the characteristic curves of phase-sensitive symmetrical short-circuit protection, the design of negative-sequence current filter and the definition of the mathematical model of overload. Besides, the hardware block diagram and the software flowchart of the protective system, which is controlled by a single chip microcomputer, is also introduced in the paper. The protective system was tested before being applied to the underground LV distribution networks. The results obtained are in conformity with the design specification. It has been verified that the protective distance is extended and the protective sensitivity is improved with the protective system. The field experience has shown that the protective system is stable and reliable, and will be of great application value in the mining industry. 7 refs., 5 figs., 2 tabs.

  13. Field application of a cable NDT system for cable-stayed bridge using MFL sensors integrated

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ju Won; Choi, Jun Sung; Park, Seung Hee [Sungkyunkwan University, Seoul (Korea, Republic of); Lee, Eun Chan [Korea Maintance Co., Ltd., Seoul (Korea, Republic of)

    2014-02-15

    In this study, an automated cable non-destructive testing(NDT) system was developed to monitor the steel cables that are a core component of cable-stayed bridges. The magnetic flux leakage(MFL) method, which is suitable for ferromagnetic continuum structures and has been verified in previous studies, was applied to the cable inspection. A multi-channel MFL sensor head was fabricated using hall sensors and permanent magnets. A wheel-based cable climbing robot was fabricated to improve the accessibility to the cables, and operating software was developed to monitor the MFL-based NDT research and control the climbing robot. Remote data transmission and robot control were realized by applying wireless LAN communication. Finally, the developed element techniques were integrated into an MFL-based cable NDT system, and the field applicability of this system was verified through a field test at Seohae Bridge, which is a typical cable-stayed bridge currently in operation.

  14. Field application of a cable NDT system for cable-stayed bridge using MFL sensors integrated

    International Nuclear Information System (INIS)

    Kim, Ju Won; Choi, Jun Sung; Park, Seung Hee; Lee, Eun Chan

    2014-01-01

    In this study, an automated cable non-destructive testing(NDT) system was developed to monitor the steel cables that are a core component of cable-stayed bridges. The magnetic flux leakage(MFL) method, which is suitable for ferromagnetic continuum structures and has been verified in previous studies, was applied to the cable inspection. A multi-channel MFL sensor head was fabricated using hall sensors and permanent magnets. A wheel-based cable climbing robot was fabricated to improve the accessibility to the cables, and operating software was developed to monitor the MFL-based NDT research and control the climbing robot. Remote data transmission and robot control were realized by applying wireless LAN communication. Finally, the developed element techniques were integrated into an MFL-based cable NDT system, and the field applicability of this system was verified through a field test at Seohae Bridge, which is a typical cable-stayed bridge currently in operation.

  15. Processing of hazardous material, or damage treatment method for shallow layer underground storage structure

    International Nuclear Information System (INIS)

    Ito, Hiroshi; Sakaguchi, Takehiko; Nishioka, Yoshihiro.

    1997-01-01

    In radioactive waste processing facilities and shallow layer underground structures for processing hazardous materials, sheet piles having freezing pipes at the joint portions are spiked into soils at the periphery of a damaged portion of the shallow layer underground structure for processing or storing hazardous materials. Liquid nitrogen is injected to the freezing pipes to freeze the joint portions of adjacent sheet piles. With such procedures, continuous waterproof walls are formed surrounding the soils at the peripheries of the damaged portion. Further, freezing pipes are disposed in the surrounding soils, and liquid nitrogen is injected to freeze the soils. The frozen soils are removed, and artificial foundation materials are filled in the space except for the peripheries of the damaged portion after the removal thereof, and liquid suspension is filled in the peripheries of the damaged portion, and restoration steps for closing the damaged portion are applied. Then, the peripheries of the damaged portion are buried again. With such procedures, series of treatments for removing contaminated soils and repairing a damaged portion can be conducted efficiently at a low cost. (T.M.)

  16. Electrical power cable engineering

    CERN Document Server

    Thue, William A

    2011-01-01

    Fully updated, Electrical Power Cable Engineering, Third Edition again concentrates on the remarkably complex design, application, and preparation methods required to terminate and splice cables. This latest addition to the CRC Press Power Engineering series covers cutting-edge methods for design, manufacture, installation, operation, and maintenance of reliable power cable systems. It is based largely on feedback from experienced university lecturers who have taught courses on these very concepts.The book emphasizes methods to optimize vital design and installation of power cables used in the

  17. UNDERGROUND

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1993-11-15

    Full text: Cossetted deep underground, sheltered from cosmic ray noise, has always been a favourite haunt of neutrino physicists. Already in the 1930s, significant limits were obtained by taking a geiger counter down in Holborn 'tube' station, one of the deepest in London's underground system. Since then, neutrino physicists have popped up in many unlikely places - gold mines, salt mines, and road tunnels deep under mountain chains. Two such locations - the 1MB (Irvine/ Michigan/Brookhaven) detector 600 metres below ground in an Ohio salt mine, and the Kamiokande apparatus 1000m underground 300 km west of Tokyo - picked up neutrinos on 23 February 1987 from the famous 1987A supernova. Purpose-built underground laboratories have made life easier, notably the Italian Gran Sasso Laboratory near Rome, 1.4 kilometres below the surface, and the Russian Baksan Neutrino Observatory under Mount Andyrchi in the Caucasus range. Gran Sasso houses ICARUS (April, page 15), Gallex, Borexino, Macro and the LVD Large Volume Detector, while Baksan is the home of the SAGE gallium-based solar neutrino experiment. Elsewhere, important ongoing underground neutrino experiments include Soudan II in the US (April, page 16), the Canadian Sudbury Neutrino Observatory with its heavy water target (January 1990, page 23), and Superkamiokande in Japan (May 1991, page 8)

  18. Implementation of the buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Kostelnik, K.M.; Merrill, S.K.

    1992-01-01

    The Department of Energy (DOE), Office of Technology Development (OTD) has initiated the Buried Waste Integrated Demonstration (BWID) to resolve technological deficiencies associated with the remediation of radioactive and hazardous buried waste. The BWID mission is to identify, demonstrate, and transfer innovative technologies for the remediation of DOE buried waste. To accomplish the mission, BWID is using a systems approach which supports the development of a suite of advanced and innovative technologies for the effective and efficient remediation of buried waste. This systems approach includes technologies for theentire remediation cycle. Specifically, BWID sponsors technology development in the following technology categories: site and waste characterization, retrieval, preprocessing, ex situ treatment, packaging, transportation, storage, disposal, and post-disposal monitoring

  19. Cable Television: Franchising Considerations.

    Science.gov (United States)

    Baer, Walter S.; And Others

    This volume is a comprehensive reference guide to cable television technology and issues of planning, franchising, and regulating a cable system. It is intended for local government officials and citizens concerned with the development of cable television systems in their communities, as well as for college and university classes in…

  20. Colleges and Cable Franchising.

    Science.gov (United States)

    Glenn, Neal D.

    After noting issues of audience appeal and financial and philosophical support for educational broadcasting, this paper urges community colleges to play an active role in the process of cable franchising. The paper first describes a cable franchise as a contract between a government unit and the cable television (CATV) company which specifies what…

  1. 14 CFR 23.689 - Cable systems.

    Science.gov (United States)

    2010-01-01

    ... in cable tension throughout the range of travel under operating conditions and temperature variations... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Cable systems. 23.689 Section 23.689... Systems § 23.689 Cable systems. (a) Each cable, cable fitting, turnbuckle, splice, and pulley used must...

  2. Cables - a question of custom-design

    International Nuclear Information System (INIS)

    Doig, Tom

    1994-01-01

    Electrical equipment such as cabling can often be the limiting factor as far as machine operations in radioactive environments are concerned. Electronic and electrical equipment will degrade if exposed to ionising radiation, affecting equipment reliability, or causing complete failure. However, several companies provide custom-designed products directed specifically at the nuclear industry. One such company is Habia Cable which has built up its business in submarine cables, internal engine cables, and cables for high fire risk situations. It began supplying custom-designed cables to the nuclear industry in 1986, and has since then supplied cables throughout Europe from its plant in Sweden. (Author)

  3. DOE's plan for buried transuranic (TRU) contaminated waste

    International Nuclear Information System (INIS)

    Mathur, J.; D'Ambrosia, J.; Sease, J.

    1987-01-01

    Prior to 1970, TRU-contaminated waste was buried as low-level radioactive waste. In the Defense Waste Management Plan issued in 1983, the plan for this buried TRU-contaminated waste was to monitor the buried waste, take remedial actions, and to periodically evaluate the safety of the waste. In March 1986, the General Accounting Office (GAO) recommended that the Department of Energy (DOE) provide specific plans and cost estimates related to buried TRU-contaminated waste. This plan is in direct response to the GAO request. Buried TRU-contaminated waste and TRU-contaminated soil are located in numerous inactive disposal units at five DOE sites. The total volume of this material is estimated to be about 300,000 to 500,000 m 3 . The DOE plan for TRU-contaminated buried waste and TRU-contaminated soil is to characterize the disposal units; assess the potential impacts from the waste on workers, the surrounding population, and the environment; evaluate the need for remedial actions; assess the remedial action alternatives; and implement and verify the remedial actions as appropriate. Cost estimates for remedial actions for the buried TRU-contaminated waste are highly uncertain, but they range from several hundred million to the order of $10 billion

  4. Analysis for the depth of underground resistivity structure by using MT method

    International Nuclear Information System (INIS)

    Matsuo, Koichi; Yokoi, Koichi; Negi, Tateyuki; Kasagi, Toshio; Takahashi, Takeharu; Teshima, Minoru

    2005-03-01

    The present document is to report the result of resistivity monitoring by using MT (Magnetotelluric) method near the site proposed for the Horonobe Underground Research Program at the Horonobe-cho, Hokkaido by the Japan Nuclear Cycle Development Institute. The stationary MT observation system, installed near the HDB-1 borehole on November 2002, was moved to a site at the Hokusei-en, 4 km west of the first site. This system is monitoring for the depth of underground resistivity. Observation data at the Hokusei-en from February 1st 2004 to January 31st 2005 was added to the investigation in 2004 fiscal year. But, data cannot be obtained from July 8th to November 11th of 2004 due to the disconnection trouble of the optical fiber cable for data transfer. The results were as follows; 1) Telluric and magnetic time series data measured by MT unit were transferred to a PC installed in an observation through optical fiber cable and processed and edited automatically. 2) The standard deviation of the apparent resistivity depends on range of frequency, 3% or less in the vicinity of the Schumann resonance frequency. The Standard deviation of data from 80 Hz to 0.56 Hz was less or 13%. But the standard deviation of low frequency data was more or 15%. 3) Amplitude of telluric and magnetic spectra below 1 Hz is coincident with Geomagnetic Activity K-index. Clear correlation was not admitted in resistivity and K-index. 4) Data quality was studied compared with weather data. Clear correlation was not admitted for windy day and rainy day. 5) Data was edited by the new criterion of K-index 1.3 or more, wind 6 m/s or less, precipitation 6 mm or less. As a result, the improvement of the data quality was admitted by 5 frequencies of 9 frequencies. Only one side of resistivity Rxy and Ryx was improved by 4 frequencies of the remainder. 6) In addition, data was edited by the new criterion of the coherence of the electric-magnetic amplitude. As a result, the improvement of the data quality

  5. Proposed superscreened cables and connectors

    International Nuclear Information System (INIS)

    Fowler, E.P.

    1975-11-01

    The paper summarises the present availability of superscreened cables and proposes the specification of a family of cables to meet the foreseeable needs of the nuclear power industry. The cable numbering system is described, special tests outlined and important details given for the chosen cables. Appropriate connectors are also discussed and listed with an outline of their required screening performance. (author)

  6. Large-Scale Experimental and Numerical Study of Blast Acceleration Created by Close-In Buried Explosion on Underground Tunnel Lining

    Directory of Open Access Journals (Sweden)

    Mohamad Reza Soheyli

    2016-01-01

    Full Text Available Despite growing demands for structures in water transportation tunnels, underground installations, subsurface dams, and subterranean channels, there is limited field knowledge about the dynamic behavior of these structures in the face of near-fault earthquakes or impulse excitations. This study conducted a large-scale test on underground tunnel excited by two close-in subsurface explosions. The horizontal and vertical acceleration were recorded on the vertical wall of the tunnel and the free field data including the acceleration on the ground surface at 11-meter distance from the tunnel. The frequency domain analysis of recorded results determined the frequency 961 Hz and 968 Hz for 1.69 kg and 2.76 kg equivalent T.N.T., respectively. Then, finite element analysis results were compared with the test data. The comparisons demonstrated a good correlation and satisfied the field data. Finally, based on numerical modeling, a parametric study was applied to determine the effects of shear wave velocity distance of the crater with respect to the tunnel on impulse response of the tunnel.

  7. UNDERGROUND

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Full text: Cossetted deep underground, sheltered from cosmic ray noise, has always been a favourite haunt of neutrino physicists. Already in the 1930s, significant limits were obtained by taking a geiger counter down in Holborn 'tube' station, one of the deepest in London's underground system. Since then, neutrino physicists have popped up in many unlikely places - gold mines, salt mines, and road tunnels deep under mountain chains. Two such locations - the 1MB (Irvine/ Michigan/Brookhaven) detector 600 metres below ground in an Ohio salt mine, and the Kamiokande apparatus 1000m underground 300 km west of Tokyo - picked up neutrinos on 23 February 1987 from the famous 1987A supernova. Purpose-built underground laboratories have made life easier, notably the Italian Gran Sasso Laboratory near Rome, 1.4 kilometres below the surface, and the Russian Baksan Neutrino Observatory under Mount Andyrchi in the Caucasus range. Gran Sasso houses ICARUS (April, page 15), Gallex, Borexino, Macro and the LVD Large Volume Detector, while Baksan is the home of the SAGE gallium-based solar neutrino experiment. Elsewhere, important ongoing underground neutrino experiments include Soudan II in the US (April, page 16), the Canadian Sudbury Neutrino Observatory with its heavy water target (January 1990, page 23), and Superkamiokande in Japan (May 1991, page 8)

  8. A study on the wireless transmission characteristic in the deep underground

    International Nuclear Information System (INIS)

    Takamura, Hisashi; Okutsu, Kazuo; Sugahara, Norihisa; Torata, Shinichiro; Ohuchi, Jin

    2006-01-01

    A wireless transmission technology uses a low frequency electromagnetic wave (100[Hz] - 10[kHz]) as a carrier wave to transmit signals in the deep underground geological condition. However, this electromagnetic wave has not been used so much, because the transmission capacity is less than a high frequency electromagnetic wave, which is used to televisions and cellular phones. On the other hand, the wireless transmission technology that doesn't use the cable is considered to be useful in the radioactive waste disposal repository from the viewpoint of decreasing the influence on the barrier. This paper shows the characteristics of the wireless transmission in the granite on the basis of the in situ testing implemented in the Aespoe Hard Rock Laboratory of SKB. (author)

  9. Cable Aerodynamic Control

    DEFF Research Database (Denmark)

    Kleissl, Kenneth

    to a categorization of the different control technics together with an identification of two key mechanisms for reduction of the design drag force. During this project extensive experimental work examining the aerodynamics of the currently used cable surface modifications together with new innovative proposals have...... been conducted. The two current prevailing systems consisting of helically filleted cables and cables with a pattern-indented surface were directly compared under the same conditions and both applications were found with attractive properties. The pattern-indented surface maintained a low supercritical...... of reducing the intensity of the axial flow and disrupting the near wake flow structures. Similar studies during wet conditions with artificial simulation of light rain in the wind tunnel showed that the plain cable suffered from severe rain-wind induced vibrations. But despite the presence of both upper...

  10. Shape accuracy optimization for cable-rib tension deployable antenna structure with tensioned cables

    Science.gov (United States)

    Liu, Ruiwei; Guo, Hongwei; Liu, Rongqiang; Wang, Hongxiang; Tang, Dewei; Song, Xiaoke

    2017-11-01

    Shape accuracy is of substantial importance in deployable structures as the demand for large-scale deployable structures in various fields, especially in aerospace engineering, increases. The main purpose of this paper is to present a shape accuracy optimization method to find the optimal pretensions for the desired shape of cable-rib tension deployable antenna structure with tensioned cables. First, an analysis model of the deployable structure is established by using finite element method. In this model, geometrical nonlinearity is considered for the cable element and beam element. Flexible deformations of the deployable structure under the action of cable network and tensioned cables are subsequently analyzed separately. Moreover, the influence of pretension of tensioned cables on natural frequencies is studied. Based on the results, a genetic algorithm is used to find a set of reasonable pretension and thus minimize structural deformation under the first natural frequency constraint. Finally, numerical simulations are presented to analyze the deployable structure under two kinds of constraints. Results show that the shape accuracy and natural frequencies of deployable structure can be effectively improved by pretension optimization.

  11. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  12. Condition Monitoring of Cables Task 3 Report: Condition Monitoring Techniques for Electric Cables

    Energy Technology Data Exchange (ETDEWEB)

    Villaran, M.; Lofaro, R.; na

    2009-11-30

    For more than 20 years the NRC has sponsored research studying electric cable aging degradation, condition monitoring, and environmental qualification testing practices for electric cables used in nuclear power plants. This report summarizes several of the most effective and commonly used condition monitoring techniques available to detect damage and measure the extent of degradation in electric cable insulation. The technical basis for each technique is summarized, along with its application, trendability of test data, ease of performing the technique, advantages and limitations, and the usefulness of the test results to characterize and assess the condition of electric cables.

  13. Analysis of Insulating Material of XLPE Cables considering Innovative Patterns of Partial Discharges

    Directory of Open Access Journals (Sweden)

    Fernando Figueroa Godoy

    2017-01-01

    Full Text Available This paper aims to analyze the quality of insulation in high voltage underground cables XLPE using a prototype which classifies the following usual types of patterns of partial discharge (PD: (1 internal PD, (2 superficial PD, (3 corona discharge in air, and (4 corona discharge in oil, in addition to considering two new PD patterns: (1 false contact and (2 floating ground. The tests and measurements to obtain the patterns and study cases of partial discharges were performed at the Testing Laboratory Equipment and Materials (LEPEM of the Federal Electricity Commission of Mexico (CFE using a measuring equipment LDIC and norm IEC60270. To classify the six patterns of partial discharges mentioned above a Probabilistic Neural Network Bayesian Modified (PNNBM method having the feature of using a large amount of data will be used and it is not saturated. In addition, PNN converges, always finding a solution in a short period of time with low computational cost. The insulation of two high voltage cables with different characteristics was analyzed. The test results allow us to conclude which wire has better insulation.

  14. Development of inspection robots for bridge cables.

    Science.gov (United States)

    Yun, Hae-Bum; Kim, Se-Hoon; Wu, Liuliu; Lee, Jong-Jae

    2013-01-01

    This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  15. Photonic-powered cable assembly

    Science.gov (United States)

    Sanderson, Stephen N.; Appel, Titus James; Wrye, IV, Walter C.

    2013-01-22

    A photonic-cable assembly includes a power source cable connector ("PSCC") coupled to a power receive cable connector ("PRCC") via a fiber cable. The PSCC electrically connects to a first electronic device and houses a photonic power source and an optical data transmitter. The fiber cable includes an optical transmit data path coupled to the optical data transmitter, an optical power path coupled to the photonic power source, and an optical feedback path coupled to provide feedback control to the photonic power source. The PRCC electrically connects to a second electronic device and houses an optical data receiver coupled to the optical transmit data path, a feedback controller coupled to the optical feedback path to control the photonic power source, and a photonic power converter coupled to the optical power path to convert photonic energy received over the optical power path to electrical energy to power components of the PRCC.

  16. Solving the sulphur situation : research assesses viability of burying sulphur

    International Nuclear Information System (INIS)

    Proce, B.

    2006-01-01

    Oil sands mining companies are looking for ways to manage growing levels of sulphur production from the Athabasca region. Infrastructure is not in place to economically transport the sulphur even though there is a global market for it. Sulphur cannot be stockpiled indefinitely as it can react with air to produce sulphur dioxide. Although above-ground sulphur storage has been regulated for more than 30 years, the underground storage of sulphur is still in a research and development phase. Alberta Sulphur Research Ltd. is currently conducting an ongoing experiment in which 100 tonne test blocks have been buried above and below the water table so that surrounding areas could be monitored over a period of years. A series of tests is being conducted to examine changes in pH in water and sulphate levels. A multi-layered engineering casing to contain the sulphur and prevent seepage is also being investigated. Once stored underground, operators also have to consider how the sulphur will be accessed in the future, as it is subject to government royalties. The storage of sulphur may have economic benefits as the product can be sold when prices are high. Most sulphur produced in Alberta is sold as an export product in the United States for use in products such as fertilizer. Shell Canada penetrated the Chinese market in 2001 and has since become one of Canada's largest sulphur exporters. Shell has also introduced a number of products using sulphur, including fertilizers, enhanced asphalt, and concrete. It was concluded that companies must take action now to mitigate future losses and to utilize current markets in order to remain competitive. 3 figs

  17. Optimal Cable Tension Distribution of the High-Speed Redundant Driven Camera Robots Considering Cable Sag and Inertia Effects

    Directory of Open Access Journals (Sweden)

    Yu Su

    2014-03-01

    Full Text Available Camera robots are high-speed redundantly cable-driven parallel manipulators that realize the aerial panoramic photographing. When long-span cables and high maneuverability are involved, the effects of cable sags and inertias on the dynamics must be carefully dealt with. This paper is devoted to the optimal cable tension distribution (OCTD for short of the camera robots. Firstly, each fast varying-length cable is discretized into some nodes for computing the cable inertias. Secondly, the dynamic equation integrated with the cable inertias is set up regarding the large-span cables as catenaries. Thirdly, an iterative optimization algorithm is introduced for the cable tension distribution by using the dynamic equation and sag-to-span ratios as constraint conditions. Finally, numerical examples are presented to demonstrate the effects of cable sags and inertias on determining tensions. The results justify the convergence and effectiveness of the algorithm. In addition, the results show that it is necessary to take the cable sags and inertias into consideration for the large-span manipulators.

  18. A unique cabling designed to produce Rutherford-type superconducting cable for the SSC project

    International Nuclear Information System (INIS)

    Grisel, J.; Royet, J.M.; Scanlan, R.M.; Armer, R.

    1988-08-01

    Up to 25,000 Km of keystoned flat cable must be produced for the SSC project. Starting from a specification developed by Lawrence Berkeley Laboratory (LBL), a special cabling machine has been designed by Dour Metal. It has been designed to be able to run at a speed corresponding to a maximum production rate of 10 m/min. This cabling machine is the key part of the production line which consists of a precision Turkshead equipped with a variable power drive, a caterpillar, a dimensional control bench, a data acquisition system, and a take-up unit. The main features of the cabling unit to be described are a design with nearly equal path length between spool and assembling point for all the wires, and the possibility to run the machine with several over- or under-twisting ratios between cable and wires. These requirements led Dour Metal to the choice of an unconventional mechanical concept for a cabling machine. 4 refs., 2 figs

  19. Magnetic Gradient Horizontal Operator (MHGO) useful for detecting objects buried at shallow depth: cultural heritage (Villa degli Antonini, Rota Rio)

    Science.gov (United States)

    Di Filippo, Michele; Di Nezza, Maria

    2016-04-01

    Several factors were taken into consideration in order to appropriately tailor the geophysical explorations at the cultural heritage. Given the fact that each site has been neglected for a long time and in recent times used as an illegal dumping area, we thoroughly evaluated for this investigation the advantages and limitations of each specific technique, and the general conditions and history of the site. We took into account the extension of the areas to be investigated and the need for rapid data acquisition and processing. Furthermore, the survey required instrumentation with sensitivity to small background contrasts and as little as possible affected by background noise sources. In order to ascertain the existence and location of underground buried walls, a magnetic gradiometer survey (MAG) was planned. The map of the magnetic anomalies is not computed to reduction at the pole (RTP), but with a magnetic horizontal gradient operator (MHGO). The magnetic horizontal gradient operator (MHGO) generates from a grid of vertical gradient a grid of steepest slopes (i.e. the magnitude of the gradient) at any point on the surface. The MHGO is reported as a number (rise over run) rather than degrees, and the direction is opposite to that of the slope. The MHGO is zero for a horizontal surface, and approaches infinity as the slope approaches the vertical. The gradient data are especially useful for detecting objects buried at shallow depth. The map reveals some details of the anomalies of the geomagnetic field. Magnetic anomalies due to walls are more evident than in the total intensity map, whereas anomalies due to concentrations of debris are very weak. In this work we describe the results of an investigation obtained with magnetometry investigation for two archaeological sites: "Villa degli Antonini" (Genzano, Rome) and Rota Ria (Mugnano in Teverina, Viterbo). Since the main goal of the investigation was to understand the nature of magnetic anomalies with cost

  20. Cable networks, services, and management

    CERN Document Server

    2015-01-01

    Cable Networks, Services, and Management is the first book to cover cable networks, services, and their management, in-depth, for network operators, engineers, researchers, and students. Thirteen experts in various fields have contributed their knowledge of network architectures and services, Operations, Administration, Maintenance, Provisioning, Troubleshooting (OAMPT) for residential and business services, cloud, Software Defined Networks (SDN), as well as virtualization concepts and their applications as part of the future directions of cable networks. The book begins by introducing architecture and services for Data Over Cable Service Interface Specification (DOCSIS) 3.0/ 3.1, Converged Cable Access Platform (CCAP), Content Distribution Networks (CDN, IP TV, and Packet Cable and Wi-Fi for Residential Services. Topics that are discussed in proceeding chapters include: operational systems and management architectures, service orders, provisioning, fault manageme t, performance management, billing systems a...

  1. Development of Inspection Robots for Bridge Cables

    Directory of Open Access Journals (Sweden)

    Hae-Bum Yun

    2013-01-01

    Full Text Available This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge cables and current bridge cable inspection methods is also presented.

  2. How do you like them cables?

    CERN Multimedia

    Sergei Malyukov

    Cabling work is not for clautrophobic people! Cables are like the blood vessels and nervous system of ATLAS. With the help of all these cables, we can power ATLAS, control the detector and read out the data. Like the human blood vessels, they penetrate inside the ATLAS volume, reaching each of its elements. The ATLAS developers started to think about design of services, cables and pipes at the very first stages of the project. The cabling project has been developing most intensively during the last five years, passing through the projection and CAD design phases, then the installation of cable trays and finally the cables. The cable installation itself took two and a half years and was done by teams of technicians from several institutes from Russia, the Czech Republic and Poland. Here are some numbers to illustrate the scale of the ATLAS cabling system. More than 25000 optical fiber channels are used for reading the information from the sub-detectors and delivering the timing signals. The total numbe...

  3. Dynamical Analysis and Simulation Validation of Incompletely Restrained Cable-Suspended Swinging System Driven by Two Cables

    Directory of Open Access Journals (Sweden)

    Naige Wang

    2016-01-01

    Full Text Available The flexibility of the suspension multicables and driven length difference between two cables cause the translation and rotation of the platform in the incompletely restrained cable-suspended system driven by two cables (IRCSWs2, which are theoretically investigated in this paper. The suspension cables are spatially discretized using the assumed modes method (AMM and the equations of motion are derived from Lagrange equations of the first kind. Considering all the geometric matching conditions are approximately linear with external actuator, the differential algebraic equations (DAEs are transformed to a system of ordinary differential equations (ODEs. Using linear boundary conditions of the suspension cable, the current method can obtain not only the accurate longitudinal displacements of cable and posture of the platform, but also the tension between the platform and cables, and the current method is verified by ADAMS simulation.

  4. Instrumentation Cables Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Muna, Alice Baca [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); LaFleur, Chris Bensdotter [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-10-01

    A fire at a nuclear power plant (NPP) has the potential to damage structures, systems, and components important to safety, if not promptly detected and suppressed. At Browns Ferry Nuclear Power Plant on March 22, 1975, a fire in the reactor building damaged electrical power and control systems. Damage to instrumentation cables impeded the function of both normal and standby reactor coolant systems, and degraded the operators’ plant monitoring capability. This event resulted in additional NRC involvement with utilities to ensure that NPPs are properly protected from fire as intended by the NRC principle design criteria (i.e., general design criteria 3, Fire Protection). Current guidance and methods for both deterministic and performance based approaches typically make conservative (bounding) assumptions regarding the fire-induced failure modes of instrumentation cables and those failure modes effects on component and system response. Numerous fire testing programs have been conducted in the past to evaluate the failure modes and effects of electrical cables exposed to severe thermal conditions. However, that testing has primarily focused on control circuits with only a limited number of tests performed on instrumentation circuits. In 2001, the Nuclear Energy Institute (NEI) and the Electric Power Research Institute (EPRI) conducted a series of cable fire tests designed to address specific aspects of the cable failure and circuit fault issues of concern1. The NRC was invited to observe and participate in that program. The NRC sponsored Sandia National Laboratories to support this participation, whom among other things, added a 4-20 mA instrumentation circuit and instrumentation cabling to six of the tests. Although limited, one insight drawn from those instrumentation circuits tests was that the failure characteristics appeared to depend on the cable insulation material. The results showed that for thermoset insulated cables, the instrument reading tended to drift

  5. Underground pipeline corrosion

    CERN Document Server

    Orazem, Mark

    2014-01-01

    Underground pipelines transporting liquid petroleum products and natural gas are critical components of civil infrastructure, making corrosion prevention an essential part of asset-protection strategy. Underground Pipeline Corrosion provides a basic understanding of the problems associated with corrosion detection and mitigation, and of the state of the art in corrosion prevention. The topics covered in part one include: basic principles for corrosion in underground pipelines, AC-induced corrosion of underground pipelines, significance of corrosion in onshore oil and gas pipelines, n

  6. Compact Buried Ducts in a Hot-Humid Climate House

    Energy Technology Data Exchange (ETDEWEB)

    Mallay, Dave [Home Innovation Research Labs, Upper Marlboro, MD (United States)

    2016-01-07

    "9A system of compact, buried ducts provides a high-performance and cost-effective solution for delivering conditioned air throughout the building. This report outlines research activities that are expected to facilitate adoption of compact buried duct systems by builders. The results of this research would be scalable to many new house designs in most climates and markets, leading to wider industry acceptance and building code and energy program approval. The primary research question with buried ducts is potential condensation at the outer jacket of the duct insulation in humid climates during the cooling season. Current best practices for buried ducts rely on encapsulating the insulated ducts with closed-cell spray polyurethane foam insulation to control condensation and improve air sealing. The encapsulated buried duct concept has been analyzed and shown to be effective in hot-humid climates. The purpose of this project is to develop an alternative buried duct system that performs effectively as ducts in conditioned space - durable, energy efficient, and cost-effective - in a hot-humid climate (IECC warm-humid climate zone 3A) with three goals that distinguish this project: 1) Evaluation of design criteria for buried ducts that use common materials and do not rely on encapsulation using spray foam or disrupt traditional work sequences; 2) Establishing design criteria for compact ducts and incorporate those with the buried duct criteria to further reduce energy losses and control installed costs; 3) Developing HVAC design guidance for performing accurate heating and cooling load calculations for compact buried ducts.

  7. Line Differential Protection Scheme Modelling for Underground 420 kV Cable Systems, EMTDC/PSCAD Relays Modelling

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Sztykiel, Michal; Dollerup, Sebastian

    2011-01-01

    Based on the analysis of a specific relay model and an HVAC (High Voltage Alternating Current) cable system, a new approach to EMTDC/PSCAD modelling of protective relays is presented. Such approach allows creating complex and accurate relay models derived from the original algorithms. Relay models...... can be applied with various systems, allowing obtaining the most optimal configuration of the protective relaying. The present paper describes modelling methodology on the basis of Siemens SIPROTEC 4 7SD522/610. Relay model was verified experimentally with its real equivalent by both EMTP......-simulated and real world generated current signals connected to the relay....

  8. Experiment for buried pipes by stepped FM-CW radar; Step shiki FM-CW radar ni yoru maisetsukan tansa jikken

    Energy Technology Data Exchange (ETDEWEB)

    Suzuki, K.; Ito, M. [Kawasaki Geological Engineering, Co. Ltd., Tokyo (Japan); Tanabe, K. [Central Research Institute of Electric Power Industry, Tokyo (Japan)

    1997-05-27

    The underground radar exploration is adopted to surveys of cavity under the road and buried pipes since the result of high resolution is obtained. However, the explorative depth of the radar is shallow, 2-3m in soil basement, and its applicable field has been limited. The continuous wave radar (FM-CW radar) was devised to get deeper explorative depth, but has been used for the geological structure survey such as the fault survey since it is lower in resolution as compared with the pulse radar. Therefore, to make use of characteristics of the continuous wave radar and enhance resolution in the shallow part, an experiment on buried pipes was conducted for the purpose of assessing and improving the FM-CW radar. In this processing, the wave form treatment used in the reflection method seismic survey was adopted for the radar survey. There are some problems, but it is effective to adopt the same algorithm to that used in the seismic survey to the radar exploration. The explorative depth was discussed from the damping rate of electromagnetic waves and dynamic range of facilities of the experimental site, and 7m was obtained. 5 figs., 1 tab.

  9. 14 CFR 27.1365 - Electric cables.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electric cables. 27.1365 Section 27.1365... STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 27.1365 Electric cables. (a) Each electric connecting cable must be of adequate capacity. (b) Each cable that would overheat...

  10. The Danish Superconducting Cable Project

    DEFF Research Database (Denmark)

    Tønnesen, Ole

    1997-01-01

    The design and construction of a superconducting cable is described. The cable has a room temperature dielectric design with the cryostat placed inside the electrical insulation.BSCCO 2223 superconducting tapes wound in helix form around a former are used as the cable conductor. Results from...

  11. Cable handling

    International Nuclear Information System (INIS)

    1980-01-01

    In computerized axial tomography scanning, problems arise in exchanging electrical signals between fixed and rotating assemblies. A novel method of overcoming this problem is described in detail for both signal and high voltage cables. Apparatus using a sequence of drums and pulleys is used to maintain the interconnecting cables in a neat arrangement and free from mechanical strain. The apparatus is simple and relatively easy and inexpensive to assemble and maintain. (UK)

  12. The RHIC transfer line cable database

    International Nuclear Information System (INIS)

    Scholl, E.H.; Satogata, T.

    1995-01-01

    A cable database was created to facilitate and document installation of cables and wiring in the RHIC project, as well as to provide a data source to track possible wiring and signal problems. The eight tables of this relational database, currently implemented in Sybase, contain information ranging from cable routing to attenuation of individual wires. This database was created in a hierarchical scheme under the assumption that cables contain wires -- each instance of a cable has one to many wires associated with it. This scheme allows entry of information pertinent to individual wires while only requiring single entries for each cable. Relationships to other RHIC databases are also discussed

  13. 30 CFR 18.45 - Cable reels.

    Science.gov (United States)

    2010-07-01

    ... and locomotives shall maintain positive tension on the portable cable during reeling and unreeling. Such tension shall only be high enough to prevent a machine from running over its own cable(s). (e... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Cable reels. 18.45 Section 18.45 Mineral...

  14. 14 CFR 25.689 - Cable systems.

    Science.gov (United States)

    2010-01-01

    ... cable system must be designed so that there will be no hazardous change in cable tension throughout the... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Cable systems. 25.689 Section 25.689... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.689 Cable systems. (a...

  15. OTEC riser cable model and prototype testing

    Science.gov (United States)

    Kurt, J. P.; Schultz, J. A.; Roblee, L. H. S.

    1981-12-01

    Two different OTEC riser cables have been developed to span the distance between a floating OTEC power plant and the ocean floor. The major design concerns for a riser cable in the dynamic OTEC environment are fatigue, corrosion, and electrical/mechanical aging of the cable components. The basic properties of the cable materials were studied through tests on model cables and on samples of cable materials. Full-scale prototype cables were manufactured and were tested to measure their electrical and mechanical properties and performance. The full-scale testing was culminated by the electrical/mechanical fatigue test, which exposes full-scale cables to simultaneous tension, bending and electrical loads, all in a natural seawater environment.

  16. In situ vitrification on buried waste

    International Nuclear Information System (INIS)

    Bates, S.O.

    1992-01-01

    In situ vitrification (ISV) is being evaluated as a remedial treatment technology for buried mixed and transuranic (TRU) wastes at the Subsurface Disposal Area (SDA) at Idaho National Engineering Laboratory (INEL) and can be related to buried wastes at other Department of Energy (DOE) sites. There are numerous locations around the DOE Complex where wastes were buried in the ground or stored for future burial. The Buried Waste Program (BWP) is conducting a comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) remedial investigation/feasibility study (RI/FS) for the Department of Energy - Field Office Idaho (DOE-ID). As part of the RI/FS, an ISV scoping study on the treatability of the SDA mixed low-level and mixed TRU waste is being performed for applicability to remediation of the waste at the Radioactive Waste Management Complex (RWMC). The ISV project being conducted at the INEL by EG ampersand G Idaho, Inc. consists of a treatability investigation to collect data to satisfy nine CERCLA criteria with regards to the SDA. This treatability investigation involves a series of experiments and related efforts to study the feasibility of ISV for remediation of mixed and TRU waste disposed of at the SDA

  17. Lightning-resistant, low-inductance detonator cables

    Energy Technology Data Exchange (ETDEWEB)

    Druce, R.L.; Lee, R.S.; Moua, K.

    1994-04-01

    A lightning strike on a flat detonator cable in close proximity to a high explosive (HE) main charge poses a possible detonation hazard if the electrical explosion of the cable launches the dielectric cover coat of the cable at a high enough velocity to shock-initiate the HE. The detonator cable for the W87 system has been demonstrated to be incapable of initiating LX-17 main-charge explosive even for a 99 percentile negative lightning strike (1). The W87 cable is a relatively high inductance cable, unsuitable for use with low-inductance firesets. We have performed tests on a low-inductance cable designed for the W89 program, which show it to be marginal in its ability to withstand a lightning strike without the possibility of initiating a heated LX-17 main charge HE. A new cable design, proposed by R.E. Lee of LLNL has been tested and shown to be capable of withstanding a 99 percentile negative lightning strike without initiating LX-17 heated to 250{degree}C.

  18. Connecting an Ocean-Bottom Broadband Seismometer to a Seafloor Cabled Observatory: A Prototype System in Monterey Bay

    Science.gov (United States)

    McGill, P.; Neuhauser, D.; Romanowicz, B.

    2008-12-01

    The Monterey Ocean-Bottom Broadband (MOBB) seismic station was installed in April 2003, 40 km offshore from the central coast of California at a seafloor depth of 1000 m. It comprises a three-component broadband seismometer system (Guralp CMG-1T), installed in a hollow PVC caisson and buried under the seafloor; a current meter; and a differential pressure gauge. The station has been operating continuously since installation with no connection to the shore. Three times each year, the station is serviced with the aid of a Remotely Operated Vehicle (ROV) to change the batteries and retrieve the seismic data. In February 2009, the MOBB system will be connected to the Monterey Accelerated Research System (MARS) seafloor cabled observatory. The NSF-funded MARS observatory comprises a 52 km electro-optical cable that extends from a shore facility in Moss Landing out to a seafloor node in Monterey Bay. Once installation is completed in November 2008, the node will provide power and data to as many as eight science experiments through underwater electrical connectors. The MOBB system is located 3 km from the MARS node, and the two will be connected with an extension cable installed by an ROV with the aid of a cable-laying toolsled. The electronics module in the MOBB system is being refurbished to support the connection to the MARS observatory. The low-power autonomous data logger has been replaced with a PC/104 computer stack running embedded Linux. This new computer will run an Object Ring Buffer (ORB), which will collect data from the various MOBB sensors and forward it to another ORB running on a computer at the MARS shore station. There, the data will be archived and then forwarded to a third ORB running at the UC Berkeley Seismological Laboratory. Timing will be synchronized among MOBB's multiple acquisition systems using NTP, GPS clock emulation, and a precise timing signal from the MARS cable. The connection to the MARS observatory will provide real-time access to

  19. Concealed epispadias associated with a buried penis.

    Science.gov (United States)

    Sol Melgar, Ricardo; Gorduza, Daniela; Demède, Delphine; Mouriquand, Pierre

    2016-12-01

    The aim was to describe the clinical presentation and the surgical management of penile epispadias associated with a buried penis in five children. This is a 5-year retrospective review of patients presenting with a buried penis, a congenital defect of the penile skin shaft associated with an unretractable foreskin for whom a penile epispadias was found at the time of surgery. All had undergone surgery combining a Cantwell-Ransley procedure and refashioning of the penile skin following the authors' technique. Three children had a glanular epispadias and two had a midshaft epispadias. Four had a satisfactory outcome, and one required a complementary urethroplasty for glanular dehiscence. Buried penis and epispadias are usually isolated congenital anomalies, although they can be associated. It is therefore recommended to warn parents about the possibility of underlying penile anomaly in children with buried penises and unretractable foreskin. Careful palpation of the dorsum of the glans through the foreskin looking for a dorsal cleft could indicate an associated epispadiac urethra. Surgical correction of both anomalies can be done at the same time. Parents of boys with buried penises should be warned that underlying penile anomaly may exist. Copyright © 2016 Journal of Pediatric Urology Company. Published by Elsevier Ltd. All rights reserved.

  20. The Canfranc Underground Laboratory

    International Nuclear Information System (INIS)

    Amare, J.; Beltran, B.; Carmona, J.M.; Cebrian, S.; Garcia, E.; Irastorza, I.G.; Gomez, H.; Luzon, G.; Martinez, M.; Morales, J.; Ortiz de Solorzano, A.; Pobes, C.; Puimedon, J.; Rodriguez, A.; Ruz, J.; Sarsa, M.L.; Torres, L.; Villar, J.A.

    2005-01-01

    This paper describes the forthcoming enlargement of the Canfranc Underground Laboratory (LSC) which will allow to host new international Astroparticle Physics experiments and therefore to broaden the European underground research area. The new Canfranc Underground Laboratory will operate in coordination (through the ILIAS Project) with the Gran Sasso (Italy), Modane (France) and Boulby (UK) underground laboratories

  1. Dual-band infrared capabilities for imaging buried object sites

    Energy Technology Data Exchange (ETDEWEB)

    Del Grande, N.K.; Durbin, P.F.; Gorvad, M.R.; Perkins, D.E.; Clark, G.A.; Hernandez, J.E.; Sherwood, R.J.

    1993-04-02

    We discuss dual-band infrared (DBIR) capabilities for imaging buried object sizes. We identify physical features affecting thermal contrast needed to distinguish buried object sites from undisturbed sites or surface clutter. Apart from atmospheric transmission and system performance, these features include: object size, shape, and burial depth; ambient soil, disturbed soil and object site thermal diffusivity differences; surface temperature, emissivity, plant-cover, slope, albedo and roughness variations; weather conditions and measurement times. We use good instrumentation to measure the time-varying temperature differences between buried object sites and undisturbed soil sites. We compare near surface soil temperature differences with radiometric infrared (IR) surface temperature differences recorded at 4.7 {plus_minus} 0.4 {mu}m and at 10.6 {plus_minus} 1.0 {mu}m. By producing selective DBIR image ratio maps, we distinguish temperature-difference patterns from surface emissivity effects. We discuss temperature differences between buried object sites, filled hole site (without buried objects), cleared (undisturbed) soil sites, and grass-covered sites (with and without different types of surface clutter). We compare temperature, emissivity-ratio, visible and near-IR reflectance signatures of surface objects, leafy plants and sod. We discuss the physical aspects of environmental, surface and buried target features affecting interpretation of buried targets, surface objects and natural backgrounds.

  2. Aerodynamics of the cable of cable-stayed bridges; Shachokyo cable no kuriki shindo tokusei no rikai to soreni motozuku kuriki seishinho no teian

    Energy Technology Data Exchange (ETDEWEB)

    Matsumoto, M. [Kyoto University, Kyoto (Japan). Faculty of Engineering; Aoki, J.; Fuji, D. [West Japan Railway Company, Osaka (Japan); Kitayama, N. [Ishikawajima-Harima Heavy Industries Co. Ltd., Tokyo (Japan); Daito, Y. [Kyoto University, Kyoto (Japan)

    1996-07-21

    Wind tunnel tests were conducted assuming the aerodynamics of the cable of cable-stayed bridges especially in the case of strong wind with rain. Based on the results, an aerodynamic damping method was proposed. Factors of the rain vibration generation include the three-dimensional axial flow behind the cable, which is formed by the wind direction deviation angle, the upper side water flow on the cable surface formed by the rain, and the Karman vortex shedding, which are not uniform in the span direction. Newly proposed cable with elliptical plates showed an effective dumping performance. It restrains the formation of water flow due to its profile, and is effective for unstableness due to water flow formation. Distribution of the axial flow in the cable span direction was made clear. Three-dimensionality of the vortex shedding was greatly affected by this axial flow. Frequency of the Karman vortex shedding changed in the wide band by the axial flow. It was suggested that three-dimensionality of the flow field is enhanced by the rolling vibration, resulting in the unstableness of heaving vibration. 5 refs., 15 figs.

  3. Composite carbon fiber cables; Des cables composites en fibres de carbone

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2002-10-01

    In order to fulfill the requirements of offshore engineering, Freyssinet, a daughter company of the European Vinci group, has developed a series of high-performance carbon fiber cables. These composite materials have an excellent fatigue behaviour in a huge range of constraints. Moreover, their low weight allows the implementation of very long lengths of cables in marine environment with no loss in capacity. The specific weight of the current part of the cable is reduced by a factor of 4 with respect to an equivalent capacity armature made of steel. These materials were presented in June 2002 at the ultra deep engineering and technologies (UDET) exhibition of Brest (France). (J.S.)

  4. Understanding losses in three core armoured submarine cables

    DEFF Research Database (Denmark)

    Silva, Filipe Miguel Faria da; Ebdrup, Thomas; Bak, Claus Leth

    2016-01-01

    . For practical an economical reasons the preferred choice of cable for both the array and the transmission cables are three-core armoured submarine cables. Therefore, it has becoming increasingly important to be able to calculate the ampacity of such cables accurately. At present time, the ampacity of three......-core armoured submarine cables is calculated according to IEC 60287-1-1 [1]. Various measurements conducted both by cable manufacturers and transmission system operators (TSO) have shown that using the cable rating method stated in IEC 60287-1-1 underestimates the cable ampacity [2]-[6]. Furthermore......, measurements conducted within the cable industry have shown that an armoured three core cable has higher losses than equal unarmoured three core cables. It is also suggested that the inaccuracy in the IEC armour’s loss factor (λ2) is the main responsible for the conservatism in the IEC cable rating method...

  5. Design study of underground facility of the Underground Research Laboratory

    International Nuclear Information System (INIS)

    Hibiya, Keisuke; Akiyoshi, Kenji; Ishizuka, Mineo; Anezaki, Susumu

    1998-03-01

    Geoscientific research program to study deep geological environment has been performed by Power Reactor and Nuclear Fuel Development Corporation (PNC). This research is supported by 'Long-Term Program for Research, Development and Utilization of Nuclear Energy'. An Underground Research Laboratory is planned to be constructed at Shoma-sama Hora in the research area belonging to PNC. A wide range of geoscientific research and development activities which have been previously studied at the Tono Area is planned in the laboratory. The Underground Research Laboratory is consisted of Surface Laboratory and Underground Research Facility located from the surface down to depth between several hundreds and 1,000 meters. Based on the results of design study in last year, the design study performed in this year is to investigate the followings in advance of studies for basic design and practical design: concept, design procedure, design flow and total layout. As a study for the concept of the underground facility, items required for the facility are investigated and factors to design the primary form of the underground facility are extracted. Continuously, design methods for the vault and the underground facility are summarized. Furthermore, design procedures of the extracted factors are summarized and total layout is studied considering the results to be obtained from the laboratory. (author)

  6. Cable Bacteria in Freshwater Sediments

    DEFF Research Database (Denmark)

    Risgaard-Petersen, Nils; Kristiansen, Michael; Frederiksen, Rasmus

    2015-01-01

    In marine sediments cathodic oxygen reduction at the sediment surface can be coupled to anodic sulfide oxidation in deeper anoxic layers through electrical currents mediated by filamentous, multicellular bacteria of the Desulfobulbaceae family, the so-called cable bacteria. Until now, cable...... bacteria have only been reported from marine environments. In this study, we demonstrate that cable bacteria also occur in freshwater sediments. In a first step, homogenized sediment collected from the freshwater stream Giber Å, Denmark, was incubated in the laboratory. After 2 weeks, pH signatures...... marine cable bacteria, with the genus Desulfobulbus as the closest cultured lineage. The results of the present study indicate that electric currents mediated by cable bacteria could be important for the biogeochemistry in many more environments than anticipated thus far and suggest a common evolutionary...

  7. Length of a Hanging Cable

    Directory of Open Access Journals (Sweden)

    Eric Costello

    2011-01-01

    Full Text Available The shape of a cable hanging under its own weight and uniform horizontal tension between two power poles is a catenary. The catenary is a curve which has an equation defined by a hyperbolic cosine function and a scaling factor. The scaling factor for power cables hanging under their own weight is equal to the horizontal tension on the cable divided by the weight of the cable. Both of these values are unknown for this problem. Newton's method was used to approximate the scaling factor and the arc length function to determine the length of the cable. A script was written using the Python programming language in order to quickly perform several iterations of Newton's method to get a good approximation for the scaling factor.

  8. High voltage dc cables

    Energy Technology Data Exchange (ETDEWEB)

    Bjustrom, B

    1965-12-01

    How stress distribution in dc cables varies with temperature and stress level, influence of polarity reversals and space charges, and different types of overvoltage to which dc cable may be subjected are discussed. Design problems, especially as related to corrosion protection and to mechanical stress caused by wire armoring during manufacturing and laying, accessories and work done on test methods, and the possibility of designing 400 to 600 kV dc cables for transmitting 2000 to 4000 MW are described.

  9. Long-term test of the 22.9kV HTS power cable system in LS Cable Ltd

    International Nuclear Information System (INIS)

    Jang, Hyun Man; Lee, Chang Young; Kim, Choon Dong; Kim, Do Hyung; Park, In Son; Ji, Bong Ki; Kim, Dong Wook; Cho, Jeonwook

    2006-01-01

    Since 2001, LS cable Ltd. has been developing the design, manufacturing and evaluation technologies for high temperature superconducting (HTS) power cable system as a member of DAPAS (Dream for Advanced Power system by Applied Superconductivity technology) program in Korea. The 30 m HTS cable system that is rated at 22.9 kV and 1.2 kA giving a rated capacity of 50 MVA had been developed and tested. The cable was designed as a cold dielectric type employing Bi-2223 HTS tapes and polypropylene (PP) laminated paper as the conductor and electrical insulation, respectively. The cable is cooled with sub-cooled liquid nitrogen at temperature from 75 to 77 K. The manufacturing and the installation of the cable system were completed in 2004. Long-term performance test of the cable system has been conducted for six months to verify its electric and mechanical properties in 2005

  10. Bulk Electrical Cable Non-Destructive Examination Methods for Nuclear Power Plant Cable Aging Management Programs

    Energy Technology Data Exchange (ETDEWEB)

    Glass, Samuel W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jones, Anthony M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fifield, Leonard S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hartman, Trenton S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-09-01

    This Pacific Northwest National Laboratory milestone report describes progress to date on the investigation of nondestructive test methods focusing particularly on bulk electrical test methods that provide key indicators of cable aging and damage. The work includes a review of relevant literature as well as hands-on experimental verification of inspection capabilities. As nuclear power plants consider applying for second, or subsequent, license renewal to extend their operating period from 60 years to 80 years, it is important to understand how the materials installed in plant systems and components will age during that time and develop aging management programs to assure continued safe operation under normal and design basis events (DBE). Normal component and system tests typically confirm the cables can perform their normal operational function. The focus of the cable test program, however, is directed toward the more demanding challenge of assuring the cable function under accident or DBE. The industry has adopted 50% elongation at break (EAB) relative to the un-aged cable condition as the acceptability standard. All tests are benchmarked against the cable EAB test. EAB, however, is a destructive test so the test programs must apply an array of other nondestructive examination (NDE) tests to assure or infer the overall set of cable’s system integrity. Assessment of cable integrity is further complicated in many cases by vendor’s use of dissimilar material for jacket and insulation. Frequently the jacket will degrade more rapidly than the underlying insulation. Although this can serve as an early alert to cable damage, direct test of the cable insulation without violating the protective jacket becomes problematic. This report addresses the range of bulk electrical NDE cable tests that are or could be practically implemented in a field-test situation with a particular focus on frequency domain reflectometry (FDR). The FDR test method offers numerous advantages

  11. Self-healing cable for extreme environments

    Science.gov (United States)

    Huston, Dryver R. (Inventor); Tolmie, Bernard R. (Inventor)

    2009-01-01

    Self-healing cable apparatus and methods disclosed. The self-healing cable has a central core surrounded by an adaptive cover that can extend over the entire length of the self-healing cable or just one or more portions of the self-healing cable. The adaptive cover includes an axially and/or radially compressible-expandable (C/E) foam layer that maintains its properties over a wide range of environmental conditions. A tape layer surrounds the C/E layer and is applied so that it surrounds and axially and/or radially compresses the C/E layer. When the self-healing cable is subjected to a damaging force that causes a breach in the outer jacket and the tape layer, the corresponding localized axially and/or radially compressed portion of the C/E foam layer expands into the breach to form a corresponding localized self-healed region. The self-healing cable is manufacturable with present-day commercial self-healing cable manufacturing tools.

  12. Analytical and numerical construction of equivalent cables.

    Science.gov (United States)

    Lindsay, K A; Rosenberg, J R; Tucker, G

    2003-08-01

    The mathematical complexity experienced when applying cable theory to arbitrarily branched dendrites has lead to the development of a simple representation of any branched dendrite called the equivalent cable. The equivalent cable is an unbranched model of a dendrite and a one-to-one mapping of potentials and currents on the branched model to those on the unbranched model, and vice versa. The piecewise uniform cable, with a symmetrised tri-diagonal system matrix, is shown to represent the canonical form for an equivalent cable. Through a novel application of the Laplace transform it is demonstrated that an arbitrary branched model of a dendrite can be transformed to the canonical form of an equivalent cable. The characteristic properties of the equivalent cable are extracted from the matrix for the transformed branched model. The one-to-one mapping follows automatically from the construction of the equivalent cable. The equivalent cable is used to provide a new procedure for characterising the location of synaptic contacts on spinal interneurons.

  13. The negative binomial distribution as a model for external corrosion defect counts in buried pipelines

    International Nuclear Information System (INIS)

    Valor, Alma; Alfonso, Lester; Caleyo, Francisco; Vidal, Julio; Perez-Baruch, Eloy; Hallen, José M.

    2015-01-01

    Highlights: • Observed external-corrosion defects in underground pipelines revealed a tendency to cluster. • The Poisson distribution is unable to fit extensive count data for these type of defects. • In contrast, the negative binomial distribution provides a suitable count model for them. • Two spatial stochastic processes lead to the negative binomial distribution for defect counts. • They are the Gamma-Poisson mixed process and the compound Poisson process. • A Rogeŕs process also arises as a plausible temporal stochastic process leading to corrosion defect clustering and to negative binomially distributed defect counts. - Abstract: The spatial distribution of external corrosion defects in buried pipelines is usually described as a Poisson process, which leads to corrosion defects being randomly distributed along the pipeline. However, in real operating conditions, the spatial distribution of defects considerably departs from Poisson statistics due to the aggregation of defects in groups or clusters. In this work, the statistical analysis of real corrosion data from underground pipelines operating in southern Mexico leads to conclude that the negative binomial distribution provides a better description for defect counts. The origin of this distribution from several processes is discussed. The analysed processes are: mixed Gamma-Poisson, compound Poisson and Roger’s processes. The physical reasons behind them are discussed for the specific case of soil corrosion.

  14. Superconducting flat tape cable magnet

    Science.gov (United States)

    Takayasu, Makoto

    2015-08-11

    A method for winding a coil magnet with the stacked tape cables, and a coil so wound. The winding process is controlled and various shape coils can be wound by twisting about the longitudinal axis of the cable and bending following the easy bend direction during winding, so that sharp local bending can be obtained by adjusting the twist pitch. Stack-tape cable is twisted while being wound, instead of being twisted in a straight configuration and then wound. In certain embodiments, the straight length should be half of the cable twist-pitch or a multiple of it.

  15. 47 CFR 27.1202 - Cable/BRS cross-ownership.

    Science.gov (United States)

    2010-10-01

    ... portion of the franchise area actually served by the cable operator's cable system and the cable operator... franchise area actually served by the cable operator's cable system the cable operator will use the BRS... that no portion of the GSA of the BRS station is within the portion of the franchise area actually...

  16. Burying nuclear trash where it will stay put. Second of four articles

    International Nuclear Information System (INIS)

    Faltermayer, E.

    1979-01-01

    The issue of radioactive waste disposal threatening the growth of fission power is discussed. The challenge of burying such waste material has turned into an emotional debate by alarmists and it is feared that the government, which is responsible for waste disposal, may foul the job; e.g., the burial of wastes from atomic weapons programs has been postponed, and wastes have leaked into the ground from poorly designed temporary storage tanks. California, Maine, Wisconsin, and Iowa have imposed moratoria on new reactor starts until a satisfactory method of waste disposal has been demonstrated. The first demonstration of deep burial is scheduled for the mid- or late 1980s in a salt deposit near Carlsbad, New Mexico. The Federal government will then have to decide where to put permanent repositories, and 9 states have prohibited the burial of radioactive wastes within their borders. It takes centuries for radioactives wastes to decay, but they do decay. The industrial world routinely uses hundreds of dangerous materials (mercury, arsenic, etc.) that stay at full strength forever. These are usually dumped carelessly. Radioactive waste disposal will be far underground and sites carefully chosen. Some opponents of fission power agree that radioactive wastes can be interred safely. The only reason for hurrying a demonstration burial of reactor wastes is political. It would undercut the moratorium movement, and it will be at least 10 years before the results can be appraised. Various rock formations for storage have been assessed, with emphasis on the thick, flat beds of salt in Southwest US. Muchenergy remains in radioactive wastes, leading the author to say that burying fuel is foolish, since it may later have to be exhumed

  17. Deep underground disposal of radioactive waste in the United Kingdom

    International Nuclear Information System (INIS)

    Mathieson, J.

    1995-01-01

    The UK Government's radioactive waste disposal policy is for intermediate-level waste, and low-level waste as necessary, to be buried in a deep underground repository, and Nirex is the company, owned by the nuclear industry, charged with developing that deep facility. The Company's current focus is on surface-based geological investigations to determine the suitability of a potential repository site near Sellafield, Cumbria, in north-west England. Nirex's next step is to construct a deep underground laboratory (rock characterization facility, or RCF). Subject to a successful outcome from these investigations, Nirex will submit a planning application for the 650m deep repository at the end of this decade; this will be the subject of a further public inquiry. The timetable for the project assumes that a deep repository, capable of taking 400,000m 3 of waste, will be available by about 2010. In 1994, the UK Government began reviewing the future of the nuclear power industry and, as a separate exercise, radioactive waste management and disposal policy. Both reviews involved widespread consultations. The radwaste review has concentrated on three aspects: general policies; legal aspects of disposal (including safety requirements); and the principles of site selection and the protection of human health. Preliminary conclusions of the main radwaste review were published in August 1994. These confirmed that government continued to favor disposal rather than extended surface storage of waste. The final outcome of the review, including institutional aspects, is expected in the Spring of 1995

  18. Productivity Improvement in Underground Coal Mines - A Case Study

    Directory of Open Access Journals (Sweden)

    Devi Prasad Mishra

    2013-01-01

    Full Text Available Improvement of productivity has become an important goal for today's coal industry in the race to increase price competitiveness. The challenge now lying ahead for the coal industry is to identify areas of waste, meet the market price and maintain a healthy profit. The only way to achieve this is to reduce production costs by improving productivity, efficiency and the effectiveness of the equipment. This paper aims to identify the various factors and problems affecting the productivity of underground coal mines adopting the bord and pillar method of mining and to propose suitable measures for improving them. The various key factors affecting productivity, namely the cycle of operations, manpower deployment, machine efficiency, material handling and management of manpower are discussed. In addition, the problem of side discharge loader (SDL cable handling resulting in the wastage of precious manpower resources and SDL breakdown have also been identified and resolved in this paper.

  19. The analysis of cable forces based on natural frequency

    Science.gov (United States)

    Suangga, Made; Hidayat, Irpan; Juliastuti; Bontan, Darwin Julius

    2017-12-01

    A cable is a flexible structural member that is effective at resisting tensile forces. Cables are used in a variety of structures that employ their unique characteristics to create efficient design tension members. The condition of the cable forces in the cable supported structure is an important indication of judging whether the structure is in good condition. Several methods have been developed to measure on site cable forces. Vibration technique using correlation between natural frequency and cable forces is a simple method to determine in situ cable forces, however the method need accurate information on the boundary condition, cable mass, and cable length. The natural frequency of the cable is determined using FFT (Fast Fourier Transform) Technique to the acceleration record of the cable. Based on the natural frequency obtained, the cable forces then can be determine by analytical or by finite element program. This research is focus on the vibration techniques to determine the cable forces, to understand the physical parameter effect of the cable and also modelling techniques to the natural frequency and cable forces.

  20. Aluminium cables in automotive applications : Prestudy of aluminium cable uses in Scania products&Failure analysis and evaluation

    OpenAIRE

    Man, Yu

    2016-01-01

    The increasing demand of light constructed vehicles as well as soaring price of copper metal owing to limited nature resources have been promoting the use of aluminium metal as an alternative conductor of automotive cables. This thesis work is to lay theoretical foundations for further research and development regarding the introduction of new automotive cables i.e. aluminium cables. Current application of automotive aluminium cables in automotive industry as well as failure analysis and eval...

  1. Initial tension loss in cerclage cables.

    Science.gov (United States)

    Ménard, Jérémie; Émard, Maxime; Canet, Fanny; Brailovski, Vladimir; Petit, Yvan; Laflamme, George Y

    2013-10-01

    Cerclage cables, frequently used in the management of fractures and osteotomies, are associated with a high failure rate and significant loosening during surgery. This study compared the capacity to maintain tension of different types of orthopaedic cable systems. Multifilament Cobalt-Chrome (CoCr) cables with four different crimp/clamp devices (DePuy, Stryker, Zimmer and Smith&Nephew) and one non-metallic Nylon (Ny) cable from Kinamed were instrumented with a load cell to measure tension during insertion. Significant tension loss was observed with crimping for all cables (Ptensioner led to an additional unexpected tension loss (CoCr-DePuy: 18%, CoCr-Stryker: 29%, CoCr-Smith&Nephew: 33%, Ny: 46%, and CoCr-Zimmer: 52%). The simple CoCr (DePuy) cable system outperformed the more sophisticated locking devices due to its significantly better ability to prevent tension loss. Copyright © 2013 Elsevier Inc. All rights reserved.

  2. Environment Of Underground Water And Pollution

    Energy Technology Data Exchange (ETDEWEB)

    Han, Jeong Sang

    1998-02-15

    This book deals with environment of underground water and pollution, which introduces the role of underground water in hydrology, definition of related study of under water, the history of hydro-geology, basic conception of underground water such as origin of water, and hydrogeologic characteristic of aquifers, movement of underground water, hydrography of underground water and aquifer test analysis, change of an underground water level, and water balance analysis and development of underground water.

  3. Impact of Cross-Tie Properties on the Modal Behavior of Cable Networks on Cable-Stayed Bridges.

    Science.gov (United States)

    Ahmad, Javaid; Cheng, Shaohong; Ghrib, Faouzi

    2015-01-01

    Dynamic behaviour of cable networks is highly dependent on the installation location, stiffness, and damping of cross-ties. Thus, these are the important design parameters for a cable network. While the effects of the former two on the network response have been investigated to some extent in the past, the impact of cross-tie damping has rarely been addressed. To comprehend our knowledge of mechanics associated with cable networks, in the current study, an analytical model of a cable network will be proposed by taking into account both cross-tie stiffness and damping. In addition, the damping property of main cables in the network will also be considered in the formulation. This would allow exploring not only the effectiveness of a cross-tie design on enhancing the in-plane stiffness of a constituted cable network, but also its energy dissipation capacity. The proposed analytical model will be applied to networks with different configurations. The influence of cross-tie stiffness and damping on the modal response of various types of networks will be investigated by using the corresponding undamped rigid cross-tie network as a reference base. Results will provide valuable information on the selection of cross-tie properties to achieve more effective cable vibration control.

  4. Impact of Cross-Tie Properties on the Modal Behavior of Cable Networks on Cable-Stayed Bridges

    Directory of Open Access Journals (Sweden)

    Javaid Ahmad

    2015-01-01

    Full Text Available Dynamic behaviour of cable networks is highly dependent on the installation location, stiffness, and damping of cross-ties. Thus, these are the important design parameters for a cable network. While the effects of the former two on the network response have been investigated to some extent in the past, the impact of cross-tie damping has rarely been addressed. To comprehend our knowledge of mechanics associated with cable networks, in the current study, an analytical model of a cable network will be proposed by taking into account both cross-tie stiffness and damping. In addition, the damping property of main cables in the network will also be considered in the formulation. This would allow exploring not only the effectiveness of a cross-tie design on enhancing the in-plane stiffness of a constituted cable network, but also its energy dissipation capacity. The proposed analytical model will be applied to networks with different configurations. The influence of cross-tie stiffness and damping on the modal response of various types of networks will be investigated by using the corresponding undamped rigid cross-tie network as a reference base. Results will provide valuable information on the selection of cross-tie properties to achieve more effective cable vibration control.

  5. Electrical properties and radiation hardness of SOI systems with multilayer buried dielectric

    International Nuclear Information System (INIS)

    Barchuk, I.P.; Kilchitskaya, V.I.; Lysenko, V.S.

    1997-01-01

    In this work SOI structures with buried SiO 2 -Si 3 N 4 -SiO 2 layers have been fabricated by the ZMR-technique with the aim of improving the total dose radiation hardness of the buried dielectric layer. To optimize the fabrication process, buried layers were investigated by secondary ion mass spectrometry before and after the ZMR process, and the obtained results were compared with electrical measurements. It is shown that optimization of the preparation processes of the initial buried dielectric layers provides ZMR SOI structures with multilayer buried isolation, which are of high quality for both Si film interfaces. Particular attention is paid to the investigation of radiation-induced charge trapping in buried insulators. Buried isolation structures with a nitride layer exhibit significant reduction of radiation-induced positive charge as compared to classical buried SiO 2 layers produced by either the ZMR or the SIMOX technique

  6. High-voltage polymeric insulated cables

    Energy Technology Data Exchange (ETDEWEB)

    Ross, A

    1987-01-01

    Reviews developments in high-voltage (here defined as 25 kV, 66 kV and 132 kV) polymeric insulated cables in the UK over the period 1979-1986, with particular reference to the experience of the Eastern Electricity Board. Outlines the background to the adoption of XPLE-insulated solid cable, and the design, testing, terminations, jointing and costs of 25 kV, 66 kV and 132 kV cables.

  7. Stray current induced corrosion in lightning rod cables of 525 kV power lines towers: a case study

    International Nuclear Information System (INIS)

    Wojcicki, F. R.; Negrisoli, M. E. M.; Franco, C. V.

    2003-01-01

    With the growth of several areas in modern society, the necessity to generate and carry electrical energy to big cities has greatly increased. Cables supported by power towers with galvanized steel foundation usually carry energy. As the foundations are underground they may cause high rates of corrosion. These are usually detected by a conventional potential measurement using a Cu/CuSO 4 reference electrode. It is believed that corrosion results from stray currents that flow through the ground to close the loop between neighboring towers. Stray currents originate in the lightning rod cables of the power line towers, induced by the strong electromagnetic and electric fields of the energized power lines. The intensity and direction of those currents were measured, indicating substantial values of both their AC and DC components. The potential of the tower ground system, measured in the perpendicular direction of the main axis of the power line, was plotted as a function of the distance to the tower base. The results clearly indicated the tendency to corrosive attack in the anodic towers as reflected by the slope of the plot, whereas no signs of corrosion could be found in the reverse slope, confirming the visual inspection of the foundation. The profile of the potential plots could be changed providing the electric insulation of the lightning rod cable. (Author) 8 refs

  8. Buried nodules from the central Indian Ocean basin

    Digital Repository Service at National Institute of Oceanography (India)

    Pattan, J.N.; Parthiban, G.

    . Of these, 13 buried nodules are from two sediment cores in siliceous ooze and seven from two sediment cores in a red clay area. The morphology, size, surface texture and chemical composition of buried nodules from two different sediment type have been...

  9. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  10. Study of special spacer with damping device for suppressing wake galloping in tandem cables of cable-stayed bridges and its application to full scale bridge; Nendanseitai wo riyoshita heiretsu cable yo gensui kinotsuki spacer to sono jikkyo cable eno tekiyo ni kansuru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Yoneda, M.; Setouchi, H.; Yoshioka, A. [Kawada Industries Inc., Tokyo (Japan); Shimoda, I.; Kawahara, S. [Oiles Corp., Tokyo (Japan)

    1996-12-20

    Cable vibration called wake galloping occurs in a cable-stayed bridge, in which cables are arranged tandem, and suppression of the vibration is an extremely important discussion item. This paper describes a complex eigen value analysis performed on tandem cables having lengths of 200 m and 100 m. The analysis revealed that damping characteristics added by a spacer system with a damping device (a type to install a visco-elastic body at about middle of the tandem cables via a jig) depend largely on torsional rigidity of the cables; and the characteristics may vary with difference in intervals between cable centers and that in cable diameters. A visco-elastic damping material of an asphalt system and a spacer with a damping device used as a spring material were fabricated and applied to a full scale bridge to identify quantitatively the damping addition characteristics of this system. Furthermore, the results of tests on the full scale bridge were compared with the result of the complex eigen value analysis, from which findings useful for actual works were obtained. 18 refs., 17 figs., 6 tabs.

  11. Cable Television Report and Suggested Ordinance.

    Science.gov (United States)

    League of California Cities, Sacramento.

    Guidelines and suggested ordinances for cable television regulation by local governments are comprehensively discussed in this report. The emphasis is placed on franchising the cable operator. Seventeen legal aspects of franchising are reviewed, and an exemplary ordinance is presented. In addition, current statistics about cable franchising in…

  12. Effect of Concrete Creep on the displacement of single tower single cable plane Extradosed Cable-stayed Bridge

    Science.gov (United States)

    Shi, Jing-xian; Ran, Zhi-hong

    2018-03-01

    Extradossed Cable-stayed Bridge is both cable-stayed Bridge and Continuous rigid frame bridge mechanics feature, Beam is the main force components, cable is supplement.This article combined with a single tower and single cable plane Extradossed cable-stayed bridge in Yunnan, use different creep calculation models and analysis deflection caused by creep effects. The results showing that deflection caused by creep effect is smaller than the same span continuous rigid frame bridge, the value is about 2cm. On the other hand the deflection is increasing with ambient humidity decreases, therefore in the dry environment the calculation model is relatively large in the pre-camber. In the choice of RC creep model is significant in the dry areas.

  13. Electromagnetic scattering from buried objects

    International Nuclear Information System (INIS)

    Brock, B.C.; Sorensen, K.W.

    1994-10-01

    Radar imaging and detection of objects buried in soil has potentially important applications in the areas of nonproliferation of weapons, environmental monitoring, hazardous-waste site location and assessment, and even archeology. In order to understand and exploit this potential, it is first necessary to understand how the soil responds to an electromagnetic wave, and how targets buried within the soil scatter the electromagnetic wave. We examine the response of the soil to a short pulse, and illustrate the roll of the complex dielectric permittivity of the soil in determining radar range resolution. This leads to a concept of an optimum frequency and bandwidth for imaging in a particular soil. We then propose a new definition for radar cross section which is consistent with the modified radar equation for use with buried targets. This radar cross section plays the same roll in the modified radar equation as the traditional radar cross section does in the free-space radar equation, and is directly comparable to it. The radar cross section of several canonical objects in lossy media is derived, and examples are given for several object/soil combinations

  14. Cable indenter aging monitor

    International Nuclear Information System (INIS)

    Shook, T.A.; Gardner, J.B.

    1988-07-01

    This project was undertaken to develop a hand-held, nondestructive test device to assess the aged condition of electrical cable by in situ measurement of mechanical properties of polymeric jackets and insulations. The device is an indenter similar to those used to make hardness measurements. Comparison of measurements made on installed cables with previous measurements serving as baseline aging/mechanical property data will determine the state of aging of the field cables. Such a device will be valuable in nuclear and fossil plant life extension programs. Preliminary laboratory tests on cables covered with ethylene propylene rubber (EPR) and chlorosulfated polyethylene (CSPE) point to the measurement of the rate of force increase resulting from constant rate deformation as having the best correlation with progressive thermal aging. This first phase of the work has demonstrated the technical feasibility of the method. A second phase will include the generation of additional groundwork data and the design of the portable indenter for in situ plant measurements

  15. 46 CFR 111.60-5 - Cable installation.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping... incorporated by reference; see 46 CFR 110.10-1), including clause 8. (b) Each cable installation made in...

  16. Optical Measurement of Cable and String Vibration

    Directory of Open Access Journals (Sweden)

    Y. Achkire

    1998-01-01

    Full Text Available This paper describes a non contacting measurement technique for the transverse vibration of small cables and strings using an analog position sensing detector. On the one hand, the sensor is used to monitor the cable vibrations of a small scale mock-up of a cable structure in order to validate the nonlinear cable dynamics model. On the other hand, the optical sensor is used to evaluate the performance of an active tendon control algorithm with guaranteed stability properties. It is demonstrated experimentally, that a force feedback control law based on a collocated force sensor measuring the tension in the cable is feasible and provides active damping in the cable.

  17. Simple Program to Investigate Hysteresis Damping Effect of Cross-Ties on Cables Vibration of Cable-Stayed Bridges

    Directory of Open Access Journals (Sweden)

    Panagis G. Papadopoulos

    2012-01-01

    Full Text Available A short computer program, fully documented, is presented, for the step-by-step dynamic analysis of isolated cables or couples of parallel cables of a cable-stayed bridge, connected to each other and possibly with the deck of the bridge, by very thin pretensioned wires (cross-ties and subjected to variation of their axial forces due to traffic or to successive pulses of a wind drag force. A simplified SDOF model, approximating the fundamental vibration mode, is adopted for every individual cable. The geometric nonlinearity of the cables is taken into account by their geometric stiffness, whereas the material nonlinearities of the cross-ties include compressive loosening, tensile yielding, and hysteresis stress-strain loops. Seven numerical experiments are performed. Based on them, it is observed that if two interconnected parallel cables have different dynamic characteristics, for example different lengths, thus different masses, weights, and geometric stiffnesses, too, or if one of them has a small additional mass, then a single pretensioned very thin wire, connecting them to each other and possibly with the deck of the bridge, proves effective in suppressing, by its hysteresis damping, the vibrations of the cables.

  18. Fatigue of cable anchorage of large cable stayed bridge; Daikibo shachokyo cable teichaku kozo no hiro

    Energy Technology Data Exchange (ETDEWEB)

    Endo, T.; Matsumoto, T. [Honshu-Shikoku Bridge Authority, Tokyo (Japan); Tsukahara, H. [Yokogawa Bridge Corp., Tokyo (Japan); Miki, C. [Tokyo Institute of Technology, Tokyo (Japan)

    1995-10-21

    Design considerations such as design schemes, the assemblage and welding of steel plates, and safety for fatigue of welded connections have to be taken for the cable anchorages of the steel cable stayed bridges. In this study, two full scale models, which have different shape of box anchorages welded to the web of the main girder, were made to investigate fatigue characteristics as well as assemblage of plate and gelding details. Finite element analyses for both test models and actual bridges here carried out to compare stress distribution. It was confirmed that the assemblage and welding of both types of box anchorage were attainable kith required quality and accuracy. According to the fatigue test, fatigue cracks originated from the weldings of the bearing plate to which the load from cable socket applied directly were caused by out-of-plane bending of the bearing plate. It was proved that the slight modifications of the details around the bearing plate resulted in sufficient fatigue strength in both types of anchorage. 1 ref., 23 figs., 2 tabs.

  19. Design study of the underground facilities, the Mizunami Underground Research Laboratory

    International Nuclear Information System (INIS)

    Ishizuka, Mineo; Noda, Masaru; Shiogama, Yukihiro; Adachi, Tetsuya

    1999-02-01

    Geoscientific research on the deep geological environment has been performed by Japan Nuclear Cycle Development Institute (JNC). This research is supported by the 'Long-Term Program for Research, Development and Utilization of Nuclear Energy'. The Mizunami Underground Research Laboratory (MIU) is planned to be constructed at the Shobasama-bora site belonging to JNC. A wide range of geoscientific research and development activities which have been previously performed in and around the Tono mine is planned to be expanded in the laboratory. The MIU consisted of surface and underground facilities excavated to a depth of about 1,000 meters. In this design study, the overall layout and basic design of the underground facility and the composition of the overall research program, includes the construction of the underground facility are studied. Based on the concept of the underground facility which have been developed in 1998, the research activities which will be performed in the MIU are selected and the overall research program is revised in this year. The basic construction method and the construction equipment are also estimated. (author)

  20. Design study of underground facility of the Mizunami Underground Research Laboratory

    International Nuclear Information System (INIS)

    Ishizuka, Mineo; Noda, Masaru; Shiogama, Yukihiro; Adachi, Tetsuya

    1999-02-01

    Geoscientific research on deep geological environment has been performed by Japan Nuclear Cycle Development Institute (JNC). This research is supported by the 'Long-Term Program for Research, Development and Utilization of Nuclear Energy'. The Mizunami Underground Research Laboratory (MIU) is planned to be constructed at Shobasama-bora site belonging to JNC. A wide range of geoscientific research and development activities which have been previously performed in and around the Tono mine is planned to be expanded in the laboratory. The MIU is consisted of surface and underground facilities down to the depth of about 1,000 meters. In this design study, the overall layout and basic design of the underground facility and the composition of the overall research program which includes the construction of the underground facility are studied. Based on the concept of the underground facility which have been developed last year, the research activities which will be performed in the MIU are selected and the overall research program is revised in this year. The basic construction method and the construction equipment are also estimated. (author)

  1. Underground laboratories in Asia

    International Nuclear Information System (INIS)

    Lin, Shin Ted; Yue, Qian

    2015-01-01

    Deep underground laboratories in Asia have been making huge progress recently because underground sites provide unique opportunities to explore the rare-event phenomena for the study of dark matter searches, neutrino physics and nuclear astrophysics as well as the multi-disciplinary researches based on the low radioactive environments. The status and perspectives of Kamioda underground observatories in Japan, the existing Y2L and the planned CUP in Korea, India-based Neutrino Observatory (INO) in India and China JinPing Underground Laboratory (CJPL) in China will be surveyed

  2. Underground laboratories in Asia

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Shin Ted, E-mail: linst@mails.phys.sinica.edu.tw [College of Physical Science and Technology, Sichuan University, Chengdu 610064 China (China); Yue, Qian, E-mail: yueq@mail.tsinghua.edu.cn [Key Laboratory of Particle and Radiation Imaging (Ministry of Education) and Department of Engineering Physics, Tsinghua University, Beijing 100084 China (China)

    2015-08-17

    Deep underground laboratories in Asia have been making huge progress recently because underground sites provide unique opportunities to explore the rare-event phenomena for the study of dark matter searches, neutrino physics and nuclear astrophysics as well as the multi-disciplinary researches based on the low radioactive environments. The status and perspectives of Kamioda underground observatories in Japan, the existing Y2L and the planned CUP in Korea, India-based Neutrino Observatory (INO) in India and China JinPing Underground Laboratory (CJPL) in China will be surveyed.

  3. Cable SGEMP Code Validation Study

    Energy Technology Data Exchange (ETDEWEB)

    Ballard, William Parker [Sandia National Lab. (SNL-CA), Livermore, CA (United States). Center for CA Weapons Systems Engineering

    2013-05-01

    This report compared data taken on the Modular Bremsstrahlung Simulator using copper jacketed (cujac) cables with calculations using the RHSD-RA Cable SGEMP analysis tool. The tool relies on CEPXS/ONBFP to perform radiation transport in a series of 1D slices through the cable, and then uses a Green function technique to evaluate the expected current drive on the center conductor. The data were obtained in 2003 as part of a Cabana verification and validation experiment using 1-D geometries, but were not evaluated until now. The agreement between data and model is not adequate unless gaps between the dielectric and outer conductor (ground) are assumed, and these gaps are large compared with what is believed to be in the actual cable.

  4. Ship nuclear power device of cable aging management

    International Nuclear Information System (INIS)

    Wei Hua; Chen Miao; Chen Tao

    2012-01-01

    Cable for marine nuclear power plant continuous delivery of electrical energy. Cable is mostly in the high temperature and strong radiation and harsh working environment, and can not be replaced in the lifetime This should be the cable aging management methods through research, maintenance and repair program to provide a scientific basis. Cable aging management approach for a number of different levels of cable management at different levels, relying on computers and other modern tools, the use of information management database software maintenance of the cable through the science of aging control. Cable Aging Management including the scope of cable aging management, classification management basis and used for different levels of management supervision and implementation of means testing approach. Application of the ship that has the operational management science, both planned maintenance to improve the science, but also improves the efficiency of aging management. This management method can be extended to nuclear power plants of cable aging management. (authors)

  5. 10BASE5 Ethernet Cable & Vampire Tap

    CERN Document Server

    1983-01-01

    10BASE5 Thick Ethernet Cable, 10Mbit/sec. In the 1980s and early 1990's, Ethernet became more popular and provided a much faster data transmission rate. This cable is one of the first ethernet cables from 1983, a thick, bulky affair. Computers were attached via "Vampire Taps" which were connectors screwed straight through the shielding of the cable.

  6. Active optical cable for intrasatellite communications

    Science.gov (United States)

    Blasco, J.; Cano, D.; Navasquillo, O.; Esteban, M. A.

    2017-11-01

    DAS Photonics and Airbus Defence and Space (Spain) have been working for more than six years in the concept of an Active Optical Cable (AOC) for copper cable substitution. The main advantages that AOC offers are significant mass and size saving, better flexibility and routing of the cable and immunity to EMI.

  7. Orpheus in the Underground

    Directory of Open Access Journals (Sweden)

    Puskás Dániel

    2015-12-01

    Full Text Available In my study I deal with descents to the underworld and hell in literature in the 20th century and in contemporary literature. I will focus on modem literary reinterpretations of the myth of Orpheus, starting with Rilke’s Orpheus. Eurydice. Hermes. In Seamus Heaney’s The Underground. in the Hungarian Istvan Baka’s Descending to the Underground of Moscow and in Czesław Miłosz’s Orpheus and Eurydice underworld appears as underground, similarly to the contemporary Hungarian János Térey’s play entitled Jeramiah. where underground will also be a metaphorical underworld which is populated with the ghosts of the famous deceased people of Debrecen, and finally, in Péter Kárpáti’s Everywoman the grave of the final scene of the medieval Everyman will be replaced with a contemporary underground station. I analyse how an underground station could be parallel with the underworld and I deal with the role of musicality and sounds in the literary works based on the myth of Orpheus.

  8. Underground Layout Configuration

    International Nuclear Information System (INIS)

    A. Linden

    2003-01-01

    The purpose of this analysis was to develop an underground layout to support the license application (LA) design effort. In addition, the analysis will be used as the technical basis for the underground layout general arrangement drawings

  9. Parallel monostrand stay cable bending fatigue

    DEFF Research Database (Denmark)

    Winkler, Jan Pawel

    This dissertation investigates the bending fatigue response of high-strength steel monostrands and multistrand stay cables to cyclic transverse deformations. Increasing bridge stock numbers and a push for longer cable-supported span lengths have led to an increased number of reported incidents...... of damage and replacement of bridge stay cables due to wind and traffic-induced fatigue. The understanding of fatigue mechanisms in most steel structures is well established. However, in the case of cables composed of steel strands, many important aspects related with bending fatigue remain to be clarified...... associated with variable loading, and different testing procedures. As most of the contemporary stay cables are comprised of a number of individual highstrength steel monostrands, the research study started with an extensive experimental work on the fatigue response of a single monostrand to cyclic flexural...

  10. 40 CFR 280.220 - Ownership of an underground storage tank or underground storage tank system or facility or...

    Science.gov (United States)

    2010-07-01

    ... tank or underground storage tank system or facility or property on which an underground storage tank or underground storage tank system is located. 280.220 Section 280.220 Protection of Environment ENVIRONMENTAL... underground storage tank or underground storage tank system or facility or property on which an underground...

  11. Assessment of Potential Impact of Electromagnetic Fields from Undersea Cable on Migratory Fish Behavior

    Energy Technology Data Exchange (ETDEWEB)

    Klimley, A. P. [Univ. of California, Davis, CA (United States); Wyman, M. T. [Univ. of California, Davis, CA (United States); Kavet, Rob [Electric Power Research Inst. (EPRI), Palo Alto, CA (United States)

    2016-09-28

    The US Department of Energy and US Department of the Interior, Bureau of Ocean Energy Management commissioned this study to address the limited scientific data on the impacts of high voltage direct current cables on aquatic biota, in particular migratory species within the San Francisco Bay. Empirical evidence exists that marine animals perceive and orient to local distortions in the earth’s main geomagnetic field magnetic field. The electromagnetic fields (EMF) generated by the cables that carry electricity from hydrokinetic energy sources to shore-based power stations may produce similar local distortions in the earth’s main field. Concern exists that animals that migrate along the continental shelves might orient to the EMF from the cables, and move either inshore or offshore away from their normal path. The Trans Bay Cable (TBC) is a ±200-kilovolt (kV), 400 MW 85-km long High Voltage Direct Current (DC) buried transmission line linking Pittsburg, CA with San Francisco, CA (SF) through the San Francisco Bay. The study addresses the following specific questions based on measurements and projections of the EMF produced by an existing marine cable, the TBC, in San Francisco Bay. Specifically, does the presence of EMF from an operating power cable alter the behavior and path of bony fishes and sharks along a migratory corridor? Does the EMF from an operating power cable guide migratory movements or pose an obstacle to movement? To meet the main study objectives several activities needed to be carried out: 1) modeling of the magnetic fields produced by the TBC, 2) assessing the migratory impacts on Chinook salmon smolts (Oncorhynchus tshawytscha) and green sturgeon (Acipenser medirostris) as a result of local magnetic field distortions produced by bridge structures and 3) analyzing behavioral responses by migratory Chinook salmon and green sturgeon to a high-voltage power cable. To meet the first objective, magnetic field measurements were made using two

  12. Capacitor discharge process for welding braided cable

    Science.gov (United States)

    Wilson, Rick D.

    1995-01-01

    A capacitor discharge process for welding a braided cable formed from a plurality of individual cable strands to a solid metallic electrically conductive member comprises the steps of: (a) preparing the electrically conductive member for welding by bevelling one of its end portions while leaving an ignition projection extending outwardly from the apex of the bevel; (b) clamping the electrically conductive member in a cathode fixture; (c) connecting the electrically conductive member clamped in the cathode fixture to a capacitor bank capable of being charged to a preselected voltage value; (d) preparing the braided cable for welding by wrapping one of its end portions with a metallic sheet to form a retaining ring operable to maintain the individual strands of the braided cable in fixed position within the retaining ring; (e) clamping the braided cable and the retaining ring as a unit in an anode fixture so that the wrapped end portion of the braided cable faces the ignition projection of the electrically conductive member; and (f) moving the cathode fixture towards the anode fixture until the ignition projection of the electrically conductive member contacts the end portion of the braided cable thereby allowing the capacitor bank to discharge through the electrically conductive member and through the braided cable and causing the electrically conductive member to be welded to the braided cable via capacitor discharge action.

  13. Seismic response of buried pipelines: a state-of-the-art review

    International Nuclear Information System (INIS)

    Datta, T.K.

    1999-01-01

    A state-of-the-art review of the seismic response of buried pipelines is presented. The review includes modeling of soil-pipe system and seismic excitation, methods of response analysis of buried pipelines, seismic behavior of buried pipelines under different parametric variations, seismic stresses at the bends and intersections of network of pipelines. pipe damage in earthquakes and seismic risk analysis of buried pipelines. Based on the review, the future scope of work on the subject is outlined. (orig.)

  14. Physical degradation assessment of generator station cables

    International Nuclear Information System (INIS)

    Stonkus, D.J.

    1988-01-01

    Preliminary studies of fossil-fired and nuclear generator station cables indicate that the low voltage PVC insulated cables are in relatively good condition. The insulation is flexible and in the case of nuclear cables can withstand a design basis event after nearly 15 years of service. Cables insulated with styrene butadiene rubber have been found embrittled and cables insulated with SBR should be closely inspected in any plant assurance program. Thermal analysis using oxidative induction technique shows promise to indicate cable insulation degradation. Long term reliability assurance and plant life extension studies are being actively pursued at Ontario Hydro. A major study is currently underway to extend the life of the oldest operating fossil-fuel station, the 8-unit, 2400 MW Lakeview TGS in operation since the 1960s. Plant life assurance programs have been initiated at the 2000 MW Lambton TGS in operation since 1969, and for the oldest operating nuclear plant, Pickering NGS A in operation since the early 1970s. As cables are considered one of the critical components in a generator station due to the extreme difficulty and cost of cable replacement, test programs have been initiated to evaluate the physical degradation of the cables and relate the results to electrical diagnostic tests and to chemical changes. The decommissioning of two small nuclear stations, the 20 MW Nuclear Power Demonstration (NPD) and the 200 MW Douglas Point NGS, which were placed in service in 1962 and 1967 respectively, will provide an opportunity to perform destructive electrical and physical evaluation on field aged cables

  15. Dynamic testing of cable structures

    Directory of Open Access Journals (Sweden)

    Caetano Elsa

    2015-01-01

    Full Text Available The paper discusses the role of dynamic testing in the study of cable structures. In this context, the identification of cable force based on vibration measurements is discussed. Vibration and damping assessment are then introduced as the focus of dynamic monitoring systems, and particular aspects of the structural behaviour under environmental loads are analysed. Diverse application results are presented to support the discussion centred on cable-stayed bridges, roof structures, a guyed mast and a transmission line.

  16. Uplift mechanism for a shallow-buried structure in liquefiable sand subjected to seismic load: centrifuge model test and DEM modeling

    Science.gov (United States)

    Zhou, Jian; Wang, Zihan; Chen, Xiaoliang; Zhang, Jiao

    2014-06-01

    Based on a centrifuge model test and distinct element method (DEM), this study provides new insights into the uplift response of a shallow-buried structure and the liquefaction mechanism for saturated sand around the structure under seismic action. In the centrifuge test, a high-speed microscopic camera was installed in the structure model, by which the movements of particles around the structure were monitored. Then, a two-dimensional digital image processing technology was used to analyze the microstructure of saturated sand during the shaking event. Herein, a numerical simulation of the centrifuge experiment was conducted using a two-phase (solid and fluid) fully coupled distinct element code. This code incorporates a particle-fluid coupling model by means of a "fixed coarse-grid" fluid scheme in PFC3D (Particle Flow Code in Three Dimensions), with the modeling parameters partially calibrated based on earlier studies. The physical and numerical models both indicate the uplifts of the shallow-buried structure and the sharp rise in excess pore pressure. The corresponding micro-scale responses and explanations are provided. Overall, the uplift response of an underground structure and the occurrence of liquefaction in saturated sand are predicted successfully by DEM modeling. However, the dynamic responses during the shaking cannot be modeled accurately due to the restricted computer power.

  17. Motility of electric cable bacteria

    DEFF Research Database (Denmark)

    Bjerg, Jesper Tataru; Damgaard, Lars Riis; Holm, Simon Agner

    2016-01-01

    Cable bacteria are filamentous bacteria that electrically couple sulfide oxidation and oxygen reduction at centimeter distances, and observations in sediment environments have suggested that they are motile. By time-lapse microscopy, we found that cable bacteria used gliding motility on surfaces...... with a highly variable speed of 0.50.3 ms1 (meanstandard deviation) and time between reversals of 155108 s. They frequently moved forward in loops, and formation of twisted loops revealed helical rotation of the filaments. Cable bacteria responded to chemical gradients in their environment, and around the oxic......-anoxic interface, they curled and piled up, with straight parts connecting back to the source of sulfide. Thus, it appears that motility serves the cable bacteria in establishing and keeping optimal connections between their distant electron donor and acceptors in a dynamic sediment environment....

  18. Air flow around suspended cables

    Directory of Open Access Journals (Sweden)

    Gołębiowska Irena

    2017-01-01

    Full Text Available The impact of wind on construction structures is essential issue in design and operation. In particular, the wind can cause the dengerous vibrations of slender structures with low rigidity, eg. vibrations of cables of suspension and cable-stayed bridges or high voltage transmision lines, thus understanding of wind flow around such constructions is significant. In the paper the results of the analysis of wind flow around the cables for different Reynolds number is presented. The analysed flow meets the Navier-Stokes and continuity equations. The circle and elipse section of the cable is analysed. The discusion of vorticity, drag and lift coefficients and cases due to different angle of wind flow action is presented. The boundary layer and its infuence on total flow is analysed.

  19. Buried oxide layer in silicon

    Science.gov (United States)

    Sadana, Devendra Kumar; Holland, Orin Wayne

    2001-01-01

    A process for forming Silicon-On-Insulator is described incorporating the steps of ion implantation of oxygen into a silicon substrate at elevated temperature, ion implanting oxygen at a temperature below 200.degree. C. at a lower dose to form an amorphous silicon layer, and annealing steps to form a mixture of defective single crystal silicon and polycrystalline silicon or polycrystalline silicon alone and then silicon oxide from the amorphous silicon layer to form a continuous silicon oxide layer below the surface of the silicon substrate to provide an isolated superficial layer of silicon. The invention overcomes the problem of buried isolated islands of silicon oxide forming a discontinuous buried oxide layer.

  20. Control and monitoring of landfill gas underground migration at the City of Montreal sanitary landfill site

    International Nuclear Information System (INIS)

    Heroux, M.; Turcotte, L.

    1997-01-01

    The proposed paper covers the various aspects of control and monitoring of potential landfill gas (LFG) migration through soil voids or rock fractures at the City of Montreal sanitary landfill site. It depicts the social, geographical and geological context and presents a brief history of the landfill site. It describes the LFG collecting system and LFG migration monitoring equipment and programs. Finally it presents monitoring data taken over last few years. The landfill site is located in a well populated urban area. Since 1968, about 33 million metric tons of domestic and commercial waste have been buried in a former limestone quarry. Because of houses and buildings in the vicinity, 100 m in some locations, LFG underground migration is a major risk. LFG could indeed infiltrate buildings and reach explosive concentrations. So it must be controlled. The City of Montreal acquired the site in 1988 and has progressively built a LFG collecting system, composed of more than 288 vertical wells, to pump out of the landfill 280 million m 3 of gas annually. To verify the efficiency of this system to minimize LFG underground migration, monitoring equipment and programs have also been designed and put into operation. The monitoring network, located all around the landfill area, is composed of 21 well nests automated to monitor presence of gas in the ground in real time. In addition, 55 individual wells, where manual measurements are made, are also available. To complete the monitoring program, some measurements are also taken in buildings, houses and underground utilities in the neighborhood of the site. Monitoring data show that LFG underground migration is well controlled. They also indicate significant decrease of migration over the years corresponding to improvements to the LFG collecting system

  1. Underground laboratories in Europe

    International Nuclear Information System (INIS)

    Coccia, E

    2006-01-01

    The only clear evidence today for physics beyond the standard model comes from underground experiments and the future activity of underground laboratories appears challenging and rich. I review here the existing underground research facilities in Europe. I present briefly the main characteristics, scientific activity and perspectives of these Laboratories and discuss the present coordination actions in the framework of the European Union

  2. Southwire's High Temperature Superconducting Cable Development - Summary Report

    International Nuclear Information System (INIS)

    Sinha, Uday; Lindsay, David

    2005-01-01

    Final technical report on Southwire HTS cable development program. Southwire started an HTS cable development program beginning early 1995 with a Co-operative Research and Development Agreement (CRADA) with Oak Ridge National Laboratory. The development task was to study the properties of HTS tapes, and construct hand wound 1-m cables to study the winding characteristics of the tapes. Within a short time several 1-m long cables were constructed and tested. A goal was established to construct a 30-m long, three single-phase cables suitable to carry 1250-Aac at 12.4 kV and power Southwire's two main manufacturing plants, machinery division, and part of the corporate headquarters building. Southwire chose to construct a cold dielectric (CD) design cable that has the advantage of shielding magnetic fields and suitable for carrying larger amounts of current for future applications. The CD design however, required a dielectric material that would be suitable at liquid nitrogen temperature. After considerable testing, a polymer based tape called ''Cryoflex'' was developed by Southwire for use as a cold dielectric. Southwire developed a HTS cable making facility for the winding of HTS and dielectric tapes. At the same time Southwire and ORNL developed at Oak Ridge a dielectric testing laboratory and a 5-m cable test bed. The HTS cable requires special terminations that connect cables at 77 K and high pressures (design pressure of 150 psi) with outside power at ambient temperature and pressure. Two types of terminations called Vacuum (T-1) and Pressure termination (T-2) were developed. The vacuum termination needed very high vacuum (10 -5 bar) and cold ceramic bushings that were expensive and unreliable. The modified pressure termination eliminated vacuum, utilize industrial bushings, reduced cost, and increased reliability. Two 5-m cables were designed and constructed at Southwire with the same rating as needed for the 30-m cables. The 5-m cables were tested successfully

  3. Analysis of Electrical Coupling Parameters in Superconducting Cables

    CERN Document Server

    Bottura, L; Rosso, C

    2003-01-01

    The analysis of current distribution and redistribution in superconducting cables requires the knowledge of the electric coupling among strands, and in particular the interstrand resistance and inductance values. In practice both parameters can have wide variations in cables commonly used such as Rutherford cables for accelerators or Cable-in-Conduits for fusion and SMES magnets. In this paper we describe a model of a multi-stage twisted cable with arbitrary geometry that can be used to study the range of interstrand resistances and inductances that is associated with variations of geometry. These variations can be due to cabling or compaction effects. To describe the variations from the nominal geometry we have adopted a cable model that resembles to the physical process of cabling and compaction. The inductance calculation part of the model is validated by comparison to semi-analytical results, showing excellent accuracy and execution speed.

  4. Characterization of fiber optic cables under large tensile loads

    International Nuclear Information System (INIS)

    Ogle, J.W.; Looney, L.D.; Peterson, R.T.

    1984-01-01

    Fiber optic cables designed for the Nevada Test Site (NTS) have to withstand an unusually harsh environment. Cables have been manufactured under a 6 year old DOE specification that has been slightly modified as the cable requirements are better understood. In order to better understand the cable properties a unique capability has been established at the NTS. Instrumentation has been developed to characterize the transmission properties of 1 km of fiber optic cable placed under a controlled tensile load up to 1500 lbs. The properties measured are cable tension, cable elongation, induced attenuation, attenuation vs. location, fiber strain, bandwidth, and ambient temperature. Preforming these measurements on cables from the two qualified NTS fiber optic cable manufacturers, Siecor and Andrew Corp., led to a new set of specifications

  5. Underground Corrosion of Activated Metals in an Arid Vadose Zone Environment

    International Nuclear Information System (INIS)

    Adler Flitton, M.K; Mizia, R.E.; Bishop, C.W.

    2001-01-01

    The subsurface radioactive disposal site located at the Idaho National Engineering and Environmental Laboratory contains neutron-activated metals from nonfuel nuclear-reactor- core components. A long-term corrosion test is being conducted to obtain site-specific corrosion rates to support efforts to more accurately estimate the transfer of activated elements in an arid vadose zone environment. The tests use nonradioactive metal coupons representing the prominent neutron-activated material buried at the disposal location, namely, Type 304L stainless steel, Type 315L stainless steel, nickel-chromium alloy (UNS NO7718), beryllium, aluminum 6061-T6, and a zirconium alloy, (UNS R60804). In addition, carbon steel (the material presently used in the cask disposal liners and other disposal containers) and a duplex stainless steel (UNS S32550) (the proposed material for the high- integrity disposal containers) are also included in the test program. This paper briefly describes the test program and presents the early corrosion rate results after 1 year and 3 years of underground exposure

  6. Neutron detector with gamma compensated cable

    International Nuclear Information System (INIS)

    Warren, H.D.

    1975-01-01

    An illustrative embodiment of the invention describes a technique for essentially eliminating the radiation induced background currents that are generated in the cable that connects an ''in-core'' neutron detector to an electrical terminal that is outside of the reactor's radiation field. This undesirable radiation-induced cable current is suppressed through an appropriate selection of conductor and cable sheath materials and sizes that generally satisfy the equation: Z/sub l/sup n/d/sub l/ = Z/sub s/sup m/d/sub s/ where Z is the atomic number of the material; d is a characteristic of the size of the cable component; m and/n have values between 1 and 5 to express the electron emissivity of the cable component from photoelectric and Compton effects; l represents the conductor; and s represents the sheath. Thus, the radiation-generated electrons emitted from the conductor and the oppositely-directed electrons emitted from the inner surface of the cable sheath are mutually cancelled if this equation is satisfied. A typical cable that does meet this criterion at low temperatures has a centrally disposed Zircaloy-2 inner conductor of 0.011 inch diameter, an annular insulation of magnesium oxide powder compacted to 100 percent density, and an Inconel sheath with an outside diameter of 0.062 inch and 0.011 inch wall thickness. (auth)

  7. Numerical analysis of the stability of HTS power cable under fault current considering the gaps in the cable

    International Nuclear Information System (INIS)

    Fang, J.; Li, H.F.; Zhu, J.H.; Zhou, Z.N.; Li, Y.X.; Shen, Z.; Dong, D.L.; Yu, T.; Li, Z.M.; Qiu, M.

    2013-01-01

    Highlights: •The equivalent circuit equations and the heat balance equations were established. •The current distributions of the HTS cable under fault current were obtained. •The temperature curves of conductor layers under fault current were obtained. •The effect of the gap liquid nitrogen on the thermal characteristics was studied. -- Abstract: During the operation of a high temperature superconducting power cable in a real grid, the power cable can be impacted inevitably by large fault current. The study on current distribution and thermal characteristics in the cable under fault current is the foundation to analyze its stability. To analyze the operation situation of 110 kV/3 kA class superconducting cable under the fault current of 25 kA rms for 3 s, the equivalent circuit equations and heat balance equations were established. The current distribution curves and the temperature distribution curves were obtained. The liquid nitrogen which exists in the gaps of HTS cable was taken into consideration, the influence of gap liquid nitrogen on the thermal characteristics was investigated. The analysis results can be used to estimate the security and stability of the superconducting cable

  8. Numerical analysis of the stability of HTS power cable under fault current considering the gaps in the cable

    Energy Technology Data Exchange (ETDEWEB)

    Fang, J., E-mail: fangseer@sina.com [School of Electrical Engineering, Beijing Jiaotong University, Beijing 100044 (China); Li, H.F. [School of Electrical Engineering, Beijing Jiaotong University, Beijing 100044 (China); Zhu, J.H.; Zhou, Z.N. [China Electric Power Research Institute, Beijing 100192 (China); Li, Y.X.; Shen, Z.; Dong, D.L.; Yu, T. [School of Electrical Engineering, Beijing Jiaotong University, Beijing 100044 (China); Li, Z.M.; Qiu, M. [China Electric Power Research Institute, Beijing 100192 (China)

    2013-11-15

    Highlights: •The equivalent circuit equations and the heat balance equations were established. •The current distributions of the HTS cable under fault current were obtained. •The temperature curves of conductor layers under fault current were obtained. •The effect of the gap liquid nitrogen on the thermal characteristics was studied. -- Abstract: During the operation of a high temperature superconducting power cable in a real grid, the power cable can be impacted inevitably by large fault current. The study on current distribution and thermal characteristics in the cable under fault current is the foundation to analyze its stability. To analyze the operation situation of 110 kV/3 kA class superconducting cable under the fault current of 25 kA{sub rms} for 3 s, the equivalent circuit equations and heat balance equations were established. The current distribution curves and the temperature distribution curves were obtained. The liquid nitrogen which exists in the gaps of HTS cable was taken into consideration, the influence of gap liquid nitrogen on the thermal characteristics was investigated. The analysis results can be used to estimate the security and stability of the superconducting cable.

  9. Some considerations on special spacers with damping device for suppressing wake galloping in tandem cables of cable-stayed bridges; Heiretsu cable yo gensui kino tsuki supesa no gensui fuka tokusei ni kansuru 2,3 no kosatsu

    Energy Technology Data Exchange (ETDEWEB)

    Yoneda, M. [Kinki Univ., Higashi-Osaka, Osaka (Japan). Faculty of Science and Technology] Setouchi, H. [Kawada Industries Inc., Osaka (Japan)

    1998-03-20

    Cable vibration called wake galloping appears on cable-stayed bridges with parallel arranged cables and its suppression is an important problem. Various methods have been proposed for spacers with damping device for suppressing wake galloping in tandem cables of cable-stayed bridges. But, comparison of damping performances of various methods have not been discussed sufficiently. This paper deals with a type in which dampers are equipped on the midway of the tandem cables through the spacer jig and a type in which dampers are equipped on each surface of the tandem cables to generate shear deformation between them and circular spacer jig moiety and complex eigenvalue analyses are carried out on the two types with changing center spacing and diameters of the cables. The results clarify the relation between the structural damping characteristics and the cable spacing and the effect of torsional rigidity of the cables and also clarify of damping characteristics of the two types. 16 refs., 14 figs., 4 tabs.

  10. Environmental assessment of submarine power cables

    Energy Technology Data Exchange (ETDEWEB)

    Isus, Daniel; Martinez, Juan D. [Grupo General Cable Sistemas, S.A., 08560-Manlleu, Barcelona (Spain); Arteche, Amaya; Del Rio, Carmen; Madina, Virginia [Tecnalia Research and Innovation, 20009 San Sebastian (Spain)

    2011-03-15

    Extensive analyses conducted by the European Community revealed that offshore wind energy have relatively benign effects on the marine environment by comparison to other forms of electric power generation [1]. However, the materials employed in offshore wind power farms suffer major changes to be confined to the marine environment at extreme conditions: saline medium, hydrostatic pressure... which can produce an important corrosion effect. This phenomenon can affect on the one hand, to the material from the structural viewpoint and on the other hand, to the marine environment. In this sense, to better understand the environmental impacts of generating electricity from offshore wind energy, this study evaluated the life cycle assessment for some new designs of submarine power cables developed by General Cable. To achieve this goal, three approaches have been carried out: leaching tests, eco-toxicity tests and Life Cycle Assessment (LCA) methodologies. All of them are aimed to obtaining quantitative data for environmental assessment of selected submarine cables. LCA is a method used to assess environmental aspects and potential impacts of a product or activity. LCA does not include financial and social factors, which means that the results of an LCA cannot exclusively form the basis for assessment of a product's sustainability. Leaching tests results allowed to conclude that pH of seawater did not significantly changed by the presence of submarine three-core cables. Although, it was slightly higher in case of broken cable, pH values were nearly equals. Concerning to the heavy metals which could migrate to the aquatic medium, there were significant differences in both scenarios. The leaching of zinc is the major environmental concern during undersea operation of undamaged cables whereas the fully sectioned three-core cable produced the migration of significant quantities of copper and iron apart from the zinc migrated from the galvanized steel. Thus, the tar

  11. Environmental assessment of submarine power cables

    International Nuclear Information System (INIS)

    Isus, Daniel; Martinez, Juan D.; Arteche, Amaya; Del Rio, Carmen; Madina, Virginia

    2011-03-01

    Extensive analyses conducted by the European Community revealed that offshore wind energy have relatively benign effects on the marine environment by comparison to other forms of electric power generation [1]. However, the materials employed in offshore wind power farms suffer major changes to be confined to the marine environment at extreme conditions: saline medium, hydrostatic pressure... which can produce an important corrosion effect. This phenomenon can affect on the one hand, to the material from the structural viewpoint and on the other hand, to the marine environment. In this sense, to better understand the environmental impacts of generating electricity from offshore wind energy, this study evaluated the life cycle assessment for some new designs of submarine power cables developed by General Cable. To achieve this goal, three approaches have been carried out: leaching tests, eco-toxicity tests and Life Cycle Assessment (LCA) methodologies. All of them are aimed to obtaining quantitative data for environmental assessment of selected submarine cables. LCA is a method used to assess environmental aspects and potential impacts of a product or activity. LCA does not include financial and social factors, which means that the results of an LCA cannot exclusively form the basis for assessment of a product's sustainability. Leaching tests results allowed to conclude that pH of seawater did not significantly changed by the presence of submarine three-core cables. Although, it was slightly higher in case of broken cable, pH values were nearly equals. Concerning to the heavy metals which could migrate to the aquatic medium, there were significant differences in both scenarios. The leaching of zinc is the major environmental concern during undersea operation of undamaged cables whereas the fully sectioned three-core cable produced the migration of significant quantities of copper and iron apart from the zinc migrated from the galvanized steel. Thus, the tar

  12. Buried topography of Utopia, Mars: Persistence of a giant impact depression

    International Nuclear Information System (INIS)

    McGill, G.E.

    1989-01-01

    Knobs, partially buried craters, ring fractures, and some mesas permit a qualitative determination of the topography buried beneath younger northern plains materials. These features are widely distributed in the Utopia area but are absent in a large, roughly circular region centered at about 48 degree N, 240 degree W. This implies the existence of a circular depression about 3,300 km in diameter buried beneath Utopia Planitia that is here interpreted to represent the central part of a very large impact basin. The presence of buried curved massifs around part of this depression, and a roughly coincident mascon, lend further support. Present topography, areal geology, and paleotopography of buried surfaces all point to the persistence of this major depression for almost the entire history of Mars

  13. Non-linear stochastic response of a shallow cable

    DEFF Research Database (Denmark)

    Larsen, Jesper Winther; Nielsen, Søren R.K.

    2004-01-01

    The paper considers the stochastic response of geometrical non-linear shallow cables. Large rain-wind induced cable oscillations with non-linear interactions have been observed in many large cable stayed bridges during the last decades. The response of the cable is investigated for a reduced two...

  14. Statistical survey of the buried waters in the Protein Data Bank.

    Science.gov (United States)

    Carugo, Oliviero

    2016-01-01

    The structures of buried water molecules were studied in an ensemble of high-quality and non-redundant protein crystal structures. Buried water molecules were clustered and classified in lake-like clusters, which are completely isolated from the bulk solvent, and bay-like clusters, which are in contact with the bulk solvent through a surface water molecule. Buried water molecules are extremely common: lake-like clusters are found in 89 % of the protein crystal structures and bay-like clusters in 93 %. Clusters with only one water molecule are much more common than larger clusters. Both cluster types incline to be surrounded by loop residues, and to a minor extent by residues in extended secondary structure. Helical residues on the contrary do not tend to surround clusters of buried water molecules. One buried water molecule is found every 30-50 amino acid residues, depending on the secondary structures that are more abundant in the protein. Both main- and side-chain atoms are in contact with buried waters; they form four hydrogen bonds with the first water and 1-1.5 additional hydrogen bond for each additional water in the cluster. Consequently, buried water molecules appear to be firmly packed and rigid like the protein atoms. In this regard, it is remarkable to observe that prolines often surround water molecules buried in the protein interior. Interestingly, clusters of buried water molecules tend to be just beneath the protein surface. Moreover, water molecules tend to form a one-dimensional wire rather than more compact arrangements. This agrees with recent evidence of the mechanisms of solvent exchange between internal cavities and bulk solvent.

  15. Full-scale fire experiments on vertical horizontal cable trays

    International Nuclear Information System (INIS)

    Mangs, J.; Keski-Rahkonen, O.

    1997-10-01

    Two full-scale fire experiments on PVC cables used in nuclear power plants were carried out, one with cables in vertical position and one with cables in horizontal position. The vertical cable bundle, 3 m high, 300 mm wide and 30 mm thick, was attached to a steel cable ladder. The vertical bundle experiment was carried out in nearly free space with three walls near the cable ladder guiding air flow in order to stabilise flames. The horizontal cable experiment was carried out in a small room with five cable bundles attached to steel cable ladders. Three of the 2 m long cable bundles were located in an array, equally spaced above each other near one long side of the room and two correspondingly near the opposite long side. The vertical cable bundle was ignited with a small propane gas burner beneath the lower edge of the bundle. The horizontal cable bundles were ignited with a small propane burner beneath the lowest bundle in an array of three bundles. Rate of heat release by means of oxygen consumption calorimetry, mass change, CO 2 , CO and smoke production rate and gas, wall and cable surface temperatures were measured as a function of time, as well as time to sprinkler operation and failure of test voltage in cables. Additionally, the minimum rate of heat release needed to ignite the bundle was determined. This paper concentrates on describing and recording the experimental set-up and the data obtained. (orig.)

  16. Melter development needs assessment for RWMC buried wastes

    International Nuclear Information System (INIS)

    Donaldson, A.D.; Carpenedo, R.J.; Anderson, G.L.

    1992-02-01

    This report presents a survey and initial assessment of the existing state-of-the-art melter technology necessary to thermally treat (stabilize) buried TRU waste, by producing a highly leach resistant glass/ceramic waste form suitable for final disposal. Buried mixed transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) represents an environmental hazard requiring remediation. The Environmental Protection Agency (EPA) placed the INEL on the National Priorities List in 1989. Remediation of the buried TRU-contaminated waste via the CERCLA decision process is required to remove INEL from the National Priorities List. A Waste Technology Development (WTD) Preliminary Systems Design and Thermal Technologies Screening Study identified joule-heated and plasma-heated melters as the most probable thermal systems technologies capable of melting the INEL soil and waste to produce the desired final waste form [Iron-Enriched Basalt (IEB) glass/ceramic]. The work reported herein then surveys the state of existing melter technology and assesses it within the context of processing INEL buried TRU wastes and contaminated soils. Necessary technology development work is recommended

  17. Underground space planning in Helsinki

    Directory of Open Access Journals (Sweden)

    Ilkka Vähäaho

    2014-10-01

    Full Text Available This paper gives insight into the use of underground space in Helsinki, Finland. The city has an underground master plan (UMP for its whole municipal area, not only for certain parts of the city. Further, the decision-making history of the UMP is described step-by-step. Some examples of underground space use in other cities are also given. The focus of this paper is on the sustainability issues related to urban underground space use, including its contribution to an environmentally sustainable and aesthetically acceptable landscape, anticipated structural longevity and maintaining the opportunity for urban development by future generations. Underground planning enhances overall safety and economy efficiency. The need for underground space use in city areas has grown rapidly since the 21st century; at the same time, the necessity to control construction work has also increased. The UMP of Helsinki reserves designated space for public and private utilities in various underground areas of bedrock over the long term. The plan also provides the framework for managing and controlling the city's underground construction work and allows suitable locations to be allocated for underground facilities. Tampere, the third most populated city in Finland and the biggest inland city in the Nordic countries, is also a good example of a city that is taking steps to utilise underground resources. Oulu, the capital city of northern Finland, has also started to ‘go underground’. An example of the possibility to combine two cities by an 80-km subsea tunnel is also discussed. A new fixed link would generate huge potential for the capital areas of Finland and Estonia to become a real Helsinki-Tallinn twin city.

  18. Virtual environmental applications for buried waste characterization technology evaluation report

    International Nuclear Information System (INIS)

    1995-05-01

    The project, Virtual Environment Applications for Buried Waste Characterization, was initiated in the Buried Waste Integrated Demonstration Program in fiscal year 1994. This project is a research and development effort that supports the remediation of buried waste by identifying and examining the issues, needs, and feasibility of creating virtual environments using available characterization and other data. This document describes the progress and results from this project during the past year

  19. Virtual environmental applications for buried waste characterization technology evaluation report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The project, Virtual Environment Applications for Buried Waste Characterization, was initiated in the Buried Waste Integrated Demonstration Program in fiscal year 1994. This project is a research and development effort that supports the remediation of buried waste by identifying and examining the issues, needs, and feasibility of creating virtual environments using available characterization and other data. This document describes the progress and results from this project during the past year.

  20. Design of anti-theft/cable cut real time alert system for copper cable using microcontroller and GSM technology

    Science.gov (United States)

    Lim, E. K.; Norizan, M. N.; Mohamad, I. S.; Yasin, M. N. M.; Murad, S. A. Z.; Baharum, N. A.; Jamalullail, N.

    2017-09-01

    This paper presents the design of anti-theft/cable cut real time alert system using microcontroller and GSM technology. The detection part is using the electrical circuit wire connection in detecting the voltage drop of the cable inside the microcontroller digital input port. The GSM wireless modem is used to send the location of cable cut directly to the authority mobile phone. Microcontroller SK40C with Microchip PIC16F887 is used as a controller to control the wireless modem and also the detection device. The device is able to detect and display the location of the cable cut on the LCD display besides of and sending out the location of the cable break to the authority mobile phone wirelessly via SMS.

  1. External heating of electrical cables and auto-ignition investigation

    Energy Technology Data Exchange (ETDEWEB)

    Courty, L., E-mail: leo.courty@univ-orleans.fr [Univ. Orleans, PRISME EA 4229, 63 Avenue de Lattre de Tassigny, 18020 Bourges (France); Garo, J.P. [Institut P’, UPR 3346 CNRS, ENSMA, Univ. Poitiers, 1 Av. Clément Ader, Téléport 2, BP 40109, 86961 Futuroscope Chasseneuil (France)

    2017-01-05

    Highlights: • Electrical cables pyrolysis and flammability have been studied. • Two different experimental setups were used to study cables mass loss and flammability. • A 1-D thermal model for cables mass loss and temperature is proposed. • Spontaneous and piloted ignitions have been investigated. - Abstract: Electric cables are now extensively used for both residential and industrial applications. During more than twenty years, multi-scale approaches have been developed to study fire behavior of such cables that represents a serious challenge. Cables are rather complicated materials because they consist of an insulated part and jacket of polymeric materials. These polymeric materials can have various chemical structures, thicknesses and additives and generally have a char-forming tendency when exposed to heat source. In this work, two test methods are used for the characterization of cable pyrolysis and flammability. The first one permits the investigation of cable pyrolysis. A description of the cable mass loss is obtained, coupling an Arrhenius expression with a 1D thermal model of cables heating. Numerical results are successfully compared with experimental data obtained for two types of cable commonly used in French nuclear power plants. The second one is devoted to ignition investigations (spontaneous or piloted) of these cables. All these basic observations, measurements and modelling efforts are of major interest for a more comprehensive fire resistance evaluation of electric cables.

  2. External heating of electrical cables and auto-ignition investigation

    International Nuclear Information System (INIS)

    Courty, L.; Garo, J.P.

    2017-01-01

    Highlights: • Electrical cables pyrolysis and flammability have been studied. • Two different experimental setups were used to study cables mass loss and flammability. • A 1-D thermal model for cables mass loss and temperature is proposed. • Spontaneous and piloted ignitions have been investigated. - Abstract: Electric cables are now extensively used for both residential and industrial applications. During more than twenty years, multi-scale approaches have been developed to study fire behavior of such cables that represents a serious challenge. Cables are rather complicated materials because they consist of an insulated part and jacket of polymeric materials. These polymeric materials can have various chemical structures, thicknesses and additives and generally have a char-forming tendency when exposed to heat source. In this work, two test methods are used for the characterization of cable pyrolysis and flammability. The first one permits the investigation of cable pyrolysis. A description of the cable mass loss is obtained, coupling an Arrhenius expression with a 1D thermal model of cables heating. Numerical results are successfully compared with experimental data obtained for two types of cable commonly used in French nuclear power plants. The second one is devoted to ignition investigations (spontaneous or piloted) of these cables. All these basic observations, measurements and modelling efforts are of major interest for a more comprehensive fire resistance evaluation of electric cables.

  3. Assessment of the burning behavior of protected and unprotected cables and cable trays in nuclear installations using small- and large-scale experiments

    Energy Technology Data Exchange (ETDEWEB)

    Siemon, Matthias; Riese, Olaf; Zehfuss, Jochen [Technische Univ. Braunschweig (Germany). Inst. fuer Baustoffe, Massivbau und Brandschutz (iBMB)

    2015-12-15

    Electric installations and cables are a main fire risk source in industrial buildings and power plants. In general, cables and cable systems are associated with flash-over phenomena due to pyrolysis of fuel gases induced by the heat of an adjacent fire, fire spread along cable trays affecting additional areas besides the fire origin, being an ignition source due to malfunction. If burning, cables can emit large amounts of smoke and toxic products affecting occupants as well as the long-term functionality of structure and installations. Paying attention to these risks has led to the development of fire retardant non-corrosive (non-halogenated) cables which are qualified to reduce the individual or all of the risks mentioned. For existing installations in industrial buildings and power plants with halogenated cables, different protection measures are available and widely applied retroactively. Important protective measures are intumescent or ablative coatings, cable casings and bindings. For qualification of the effects of the protection measures, small-scale tests investigating a single cable specimen as well as large-scale cable tray test setups have been developed and carried out in the last 20 years at iBMB. In this paper, these test results are analysed regarding their effects on the heat release, ignition time and fire spread over cable trays. Furthermore, national and international research projects have investigated the burning behaviour of different cable types, tray installations, tray loading and spacing and ventilation conditions. As a conclusion, the main outcomes of past researches are summarized. Influence factors (e.g. pre-heating due to high power utilization, influence of cable aging) which have not been accounted for in detail are emphasized. The modelling of unprotected cables has been internationally studied in recent years. For future applications, the question of applicability of recently developed sub-models on the fire behaviour of protected

  4. Similarity Analysis of Cable Insulations by Chemical Test

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Seog [Central Research Institute of Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2013-10-15

    As result of this experiment, it was found that FT-IR test for material composition, TGA test for aging trend are applicable for similarity analysis of cable materials. OIT is recommended as option if TGA doesn't show good trend. Qualification of new insulation by EQ report of old insulation should be based on higher activation energy of new insulation than that of old one in the consideration of conservatism. In old nuclear power plant, it is easy to find black cable which has no marking of cable information such as manufacturer, material name and voltage. If a type test is required for qualification of these cables, how could I select representative cable? How could I determine the similarity of these cables? If manufacturer has qualified a cable for nuclear power plant more than a decade ago and composition of cable material is changed with similar one, is it acceptable to use the old EQ report for recently manufactured cable? It is well known to use FT-IR method to determine the similarity of cable materials. Infrared ray is easy tool to compare compositions of each material. But, it is not proper to compare aging trend of these materials. Study for similarity analysis of cable insulation by chemical test is described herein. To study a similarity evaluation method for polymer materials, FT-IR, TGA and OIT tests were performed for two cable insulation(old and new) which were supplied from same manufacturer. FT-IR shows good result to compare material compositions while TGA and OIT show good result to compare aging character of materials.

  5. Similarity Analysis of Cable Insulations by Chemical Test

    International Nuclear Information System (INIS)

    Kim, Jong Seog

    2013-01-01

    As result of this experiment, it was found that FT-IR test for material composition, TGA test for aging trend are applicable for similarity analysis of cable materials. OIT is recommended as option if TGA doesn't show good trend. Qualification of new insulation by EQ report of old insulation should be based on higher activation energy of new insulation than that of old one in the consideration of conservatism. In old nuclear power plant, it is easy to find black cable which has no marking of cable information such as manufacturer, material name and voltage. If a type test is required for qualification of these cables, how could I select representative cable? How could I determine the similarity of these cables? If manufacturer has qualified a cable for nuclear power plant more than a decade ago and composition of cable material is changed with similar one, is it acceptable to use the old EQ report for recently manufactured cable? It is well known to use FT-IR method to determine the similarity of cable materials. Infrared ray is easy tool to compare compositions of each material. But, it is not proper to compare aging trend of these materials. Study for similarity analysis of cable insulation by chemical test is described herein. To study a similarity evaluation method for polymer materials, FT-IR, TGA and OIT tests were performed for two cable insulation(old and new) which were supplied from same manufacturer. FT-IR shows good result to compare material compositions while TGA and OIT show good result to compare aging character of materials

  6. High voltage pulsed cable design: a practical example

    International Nuclear Information System (INIS)

    Kewish, R.W. Jr.; Boicourt, G.P.

    1979-01-01

    The design of optimum high voltage pulse cable is difficult because very little emperical data are available on performance in pulsed applications. This paper follows the design and testing of one high voltage pulse cable, 40/100 trigger cable. The design was based on an unproven theory and the impressive outcome lends support to the theory. The theory is outlined and it is shown that there exists an inductance which gives a cable of minimum size for a given maximum stress. Test results on cable manufactured according to the design are presented and compared with the test results on the cable that 40/100 replaces

  7. High voltage pulsed cable design: a practical example

    Energy Technology Data Exchange (ETDEWEB)

    Kewish, R.W. Jr.; Boicourt, G.P.

    1979-01-01

    The design of optimum high voltage pulse cable is difficult because very little emperical data are available on performance in pulsed applications. This paper follows the design and testing of one high voltage pulse cable, 40/100 trigger cable. The design was based on an unproven theory and the impressive outcome lends support to the theory. The theory is outlined and it is shown that there exists an inductance which gives a cable of minimum size for a given maximum stress. Test results on cable manufactured according to the design are presented and compared with the test results on the cable that 40/100 replaces.

  8. Underground openings production line 2012. Design, production and initial state of the underground openings

    International Nuclear Information System (INIS)

    2013-08-01

    The Underground Openings Line Production Line report describes the design requirements, the design principles, the methods of construction and the target properties for the underground rooms required for the final repository. It is one of five Production Line reports, namely the: Underground Openings Line report, Canister report, Buffer report, Backfill report, Closure report. Together, these reports cover the lifespan of the underground phases of the final repository from the start of construction of the underground rooms to their closure. Posiva has developed reference methods for constructing the underground rooms. Tunnels will be constructed using the drill and blast technique, shafts will be constructed using raise boring and the deposition holes will be constructed by reverse down reaming. Underground openings will be made safe by reinforcement by using rock bolts, net or shotcrete, depending on which type of opening is being considered, and groundwater inflows will be limited by grouting. Posiva's requirements management system (VAHA) sets out the specifications for the enactment of the disposal concept at Olkiluoto under five Levels - 1 to 5, from the most generic to the most specific. In this report, the focus is on Level 4 and 5 requirements, which provide practical guidance for the construction of the underground openings. The design requirements are presented in Level 4 and the design specification in Level 5 In addition to the long-term safety-related requirements included in VAHA, there are additional requirements regarding the operation of underground openings, e.g. space requirements due to the equipment used and its maintenance, operational and fire safety. The current reference design for the disposal facility is presented based on the design requirements and design specifications. During the lifespan of the repository the reference design will be revised and updated according to the design principles as new information is available. Reference

  9. 47 CFR 76.802 - Disposition of cable home wiring.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Disposition of cable home wiring. 76.802... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Cable Inside Wiring § 76.802 Disposition of cable home wiring. (a)(1) Upon voluntary termination of cable service by a subscriber in a single unit installation, a...

  10. Current distribution in Cable-In-Conduit Conductors

    International Nuclear Information System (INIS)

    Ferri, M.A.

    1994-05-01

    A numerical study of the current distribution in Cable-In-Conduit Conductors (CICC's) experiencing linearly ramping transport currents and transverse magnetic fields was conducted for both infinitely long, periodic cables and finite length cables terminated in low resistance joints. The goal of the study was to gain insight into the phenomenon known as Ramp Rate Limitation, an as yet unexplained correspondence between maximum attainable current and the ramp time taken to reach that current in CICC superconducting magnets. A discrete geometric model of a 27 strand multiply twisted CICC was developed to effectively represent the flux linkages, mutual inductances, and resistive contact points between the strands of an experimentally tested cable. The results of the numerical study showed that for fully periodic cables, the current imbalances due to ramping magnetic fields and ramping transport currents are negligible in the range of experimentally explored operating conditions. For finite length, joint terminated cables, however, significant imbalances can exist. Unfortunately, quantitative results are limited by a lack of knowledge of the transverse resistance between strands in the joints. Nonetheless, general results are presented showing the dependency of the imbalance on cable length, ramp time, and joint resistance for both ramping transverse magnet fields and ramping transport currents. At the conclusion of the study, it is suggested that calculated current imbalances in a finite length cable could cause certain strands to prematurely ''quench'' -- become non-superconducting --thus leading to an instability for the entire cable. This numerically predicted ''current imbalance instability'' is compared to the experimentally observed Ramp Rate Limitation for the 27 strand CICC sample

  11. submitter On Roebel Cable Geometry for Accelerator Magnet

    CERN Document Server

    Fleiter, J; Ballarino, A

    2016-01-01

    Roebel-type cables made of a ReBCO conductor are potential candidates for high-field accelerator magnets. The necessity to promote a large effective transverse section in a Roebel cable to avoid local overstress leading to degradation in electrical performance has been recently addressed. In this paper, a new geometry of meander tapes for a Roebel cable that enhances both the transverse effective section and the current margin at crossing segments is discussed. As Roebel cables are bent at the coil ends, the modulation of the bending radius of strands along the cable pitch leads to a shift of the strands with respect to each other. The shift magnitude is analytically investigated in this paper as a function of both cable features and coil geometry. Finally, the minimum transposition pitch of Roebel cables is determined on the basis of coil characteristics.

  12. Wire in the Cable-Driven System of Surgical Robot

    Science.gov (United States)

    Wang, X. F.; Lv, N.; Mu, H. Z.; Xue, L. J.

    2017-07-01

    During the evolution of the surgical robot, cable plays an important role. It translates motion and force precisely from surgeon’s hand to the tool’s tips. In the paper, the vertical wires, the composition of cable, are mathematically modeled from a geometric point of view. The cable structure and tension are analyzed according to the characteristics of wire screw twist. The structural equations of the wires in different positions are derived for both non-bent cable and bent cable, respectively. The bending moment formula of bent cable is also obtained. This will help researchers find suitable cable and design more matched pulley.

  13. ASSESSMENT OF CABLE AGING USING CONDITION MONITORING TECHNIQUES

    International Nuclear Information System (INIS)

    GROVE, E.; LOFARO, R.; SOO, P.; VILLARAN, M.; HSU, F.

    2000-01-01

    Electric cables in nuclear power plants suffer degradation during service as a result of the thermal and radiation environments in which they are installed. Instrumentation and control cables are one type of cable that provide an important role in reactor safety. Should the polymeric cable insulation material become embrittled and cracked during service, or during a loss-of-coolant-accident (LOCA) and when steam and high radiation conditions are anticipated, failure could occur and prevent the cables from fulfilling their intended safety function(s). A research program is being conducted at Brookhaven National Laboratory to evaluate condition monitoring (CM) techniques for estimating the amount of cable degradation experienced during in-plant service. The objectives of this program are to assess the ability of the cables to perform under a simulated LOCA without losing their ability to function effectively, and to identify CM techniques which may be used to determine the effective lifetime of cables. The cable insulation materials tested include ethylene propylene rubber (EPR) and cross-linked polyethylene (XLPE). Accelerated aging (thermal and radiation) to the equivalent of 40 years of service was performed, followed by exposure to simulated LOCA conditions. The effectiveness of chemical, electrical, and mechanical condition monitoring techniques are being evaluated. Results indicate that several of these methods can detect changes in material parameters with increasing age. However, each has its limitations, and a combination of methods may provide an effective means for trending cable degradation in order to assess the remaining life of cables

  14. Geophysical void detection at the site of an abandoned limestone quarry and underground mine in southwestern Pennsylvania

    International Nuclear Information System (INIS)

    Cohen, K.K.; Trevits, M.A.

    1992-01-01

    Locating underground voids, tunnels, and buried collapse structures continues to present a difficult problem for engineering geoscientists charged with this responsibility for a multitude of different studies. Solutions used and tested for void detection have run the gamut of surface geophysical and remote sensing techniques, to invasive trenching and drilling on closely-spaced centers. No where is the problem of locating underground voids more ubiquitous than in abandoned mined lands, and the U.S. Bureau of Mines continues to investigate this problem for areas overlying abandoned coal, metal, and nonmetal mines. Because of the great diversity of resources mined, the problem of void detection is compounded by the myriad of geologic conditions which exist for abandoned mined lands. At a control study site in southwestern Pennsylvania at the Bureau's Lake Lynn Laboratory, surface geophysical techniques, including seismic and other methods, were tested as a means to detect underground mine voids in the rather simple geologic environment of flat-lying sedimentary strata. The study site is underlain by an abandoned underground limestone mine developed in the Wymps Gap Limestone member of the Mississippian Mauch Chunk Formation. Portals or entrances into the mine, lead to drifts or tunnels driven into the limestone; these entries provided access to the limestone where it was extracted by the room-and-pillar method. The workings lie less than 300 ft from the surface, and survey lines or grids were positioned over the tunnels, the room-and-pillar zones, and the areas not mined. Results from these geophysical investigations are compared and contrasted. The application of this control study to abandoned mine void detection is apparent, but due to the carbonate terrain of the study site, the results may also have significance to sinkhole detection in karst topography

  15. An industrial cabling machine for the SSC

    International Nuclear Information System (INIS)

    Royet, J.; Armer, R.; Hannaford, R.; Scanlan, R.

    1989-02-01

    The SSC project will need the manufacturing of some 25,000 kilometers of keystoned flat cable. The technical specifications of the various cables to be produced are the result of five years of research and development work at LBL. An experimental cable machine was built and run in the laboratory; many improvements were implemented and tested. Semi-industrial production of the various cables was performed, and the resulting cables were used and tested in the one-meter model magnets and 17.5 meter dipole prototypes. From these experiments an industrial cabler specification was generated and used for an international RFQ. The winner of the contract is Dour Metal, a Belgium company that built the first industrial prototype which is now in a production line at New England Electric Wire Company. In this paper we describe the main characteristics of the machine and give the first industrial production results of superconducting keystoned cable for the SSC project. 4 refs

  16. 47 CFR 76.111 - Cable sports blackout.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Cable sports blackout. 76.111 Section 76.111... CABLE TELEVISION SERVICE Network Non-duplication Protection, Syndicated Exclusivity and Sports Blackout § 76.111 Cable sports blackout. (a) No community unit located in whole or in part within the specified...

  17. Dynamic model and workspace analysis of novel incompletely restrained cable-suspension swing system driven by two cables

    Directory of Open Access Journals (Sweden)

    Naige Wang

    2017-03-01

    Full Text Available The incompletely restrained cable-suspension swing system driven by two cables is introduced in this article. Based on wrench of forces theory and Lagrange’s equation of first kind, the static and dynamics models of incompletely restrained cable-suspension swing system driven by two cables are established, respectively. In order to obtain an intuitive understanding of the trajectory analysis, a dynamics model consisting of governing equation and geometric constraint conditions which is a set of the mixed differential-algebraic equation in mathematics is established. A typical feedback controller and an inverse model were set up to estimate the driving function. The effective workspace, which is used to guarantee an efficient swing process, mostly depends on the geometrical shape rather than the volume itself which was calculated by trajectory analysis. In order to estimate system features and ensure a limited range of tension in underconstrained spatial cable system, the probable location of unbalanced loading was evaluated by pointwise evaluation techniques during normal work.

  18. Configuration Synthesis for Fully Restrained 7-Cable-Driven Manipulators

    Directory of Open Access Journals (Sweden)

    Xiaoqiang Tang

    2012-10-01

    Full Text Available Cable distribution plays a vital role in Cable Driven Parallel Manipulators (CDPMs regarding tension and workspace quality, especially in fully restrained CDPMs. This paper focuses on three typical configurations of fully restrained CDPMs with 7 cables in order to introduce an approach for configuration synthesis. Firstly, the kinematic models of three types of CDPMs with 7 cables are set up. Then, in order to evaluate workspace quality, two new indices are proposed by using tensions along each cable, which are the All Cable Tension Distribution Index (ACTDI and Global Tension Distribution Index (GTDI. Next, the three types of CDPMs with 7 cables are analysed with the two indices. At the end, according to different performance requirements, the configurations of cable distribution are discussed and selected.

  19. Cable condition monitoring in a pressurized water reactor environment

    International Nuclear Information System (INIS)

    Al-Hussaini, T.J.

    1988-01-01

    Oconee Nuclear Station is the first nuclear plant designed, engineered and constructed by Duke Power Company. Even though the accelerated aging method was available to determine the life expectancy of the cable used in the reactor building, no natural aging data was available at that time. In order to be able to verify the condition of the reactor building cable over the life of the plant, an on-going cable monitoring plan was instituted. Various types of cable were selected to be monitored, and they were installed in cable life evaluation circuits in the reactor building. At five year intervals over the life of the plant, cable samples would be removed from these cable life evaluation circuits and tested to determine the effects of the reactor building environment on the integrity of the cable. A review of the cable life evaluation circuits and the results of the evaluation program to date is presented

  20. Commercialization of Medium Voltage HTS Triax TM Cable Systems

    Energy Technology Data Exchange (ETDEWEB)

    Knoll, David

    2012-12-31

    The original project scope that was established in 2007 aimed to install a 1,700 meter (1.1 mile) medium voltage HTS Triax{TM} cable system into the utility grid in New Orleans, LA. In 2010, however, the utility partner withdrew from the project, so the 1,700 meter cable installation was cancelled and the scope of work was reduced. The work then concentrated on the specific barriers to commercialization of HTS cable technology. The modified scope included long-length HTS cable design and testing, high voltage factory test development, optimized cooling system development, and HTS cable life-cycle analysis. In 2012, Southwire again analyzed the market for HTS cables and deemed the near term market acceptance to be low. The scope of work was further reduced to the completion of tasks already started and to testing of the existing HTS cable system in Columbus, OH. The work completed under the project included: • Long-length cable modeling and analysis • HTS wire evaluation and testing • Cable testing for AC losses • Optimized cooling system design • Life cycle testing of the HTS cable in Columbus, OH • Project management. The 200 meter long HTS Triax{TM} cable in Columbus, OH was incorporated into the project under the initial scope changes as a test bed for life cycle testing as well as the site for an optimized HTS cable cooling system. The Columbus cable utilizes the HTS TriaxTM design, so it provided an economical tool for these of the project tasks.

  1. Experimental investigation of buried tritium in plant and animal tissues

    International Nuclear Information System (INIS)

    Kim, S. B.; Workman, W. J. G.; Davis, P. A.

    2008-01-01

    Buried exchangeable tritium appears as part of organically bound tritium (OBT) in the traditional experimental determination of OBT. Since buried tritium quickly exchanges with hydrogen atoms in the body following ingestion, assuming that it is part of OBT rather than part of tritiated water (HTO) could result in a significant overestimate of the ingestion dose. This paper documents an experimental investigation into the existence, amount and significance of buried tritium in plant and fish samples. OBT concentrations in the samples were determined in the traditional way and also following denaturing with five chemical solutions that break down large molecules and expose buried tritium to exchange with free hydrogen atoms. A comparison of the OBT concentrations before and after denaturing, together with the concentration of HTO in the supernatant obtained after denaturing, suggests that buried OBT may exist but makes up less than 5% of the OBT concentration in plants and at most 20% of the OBT concentration in fish. The effects of rinse time and rinse water volumes were investigated to optimize the removal of exchangeable OBT from the samples. (authors)

  2. The surgical correction of buried penis: a new technique

    NARCIS (Netherlands)

    Boemers, T. M.; de Jong, T. P.

    1995-01-01

    We report a new surgical technique for the correction of buried penis. The study comprised 10 boys with buried penis. The technique consisted of resection of abnormal dartos attachments, unfurling of the prepuce and correction of the deficient shaft skin by reapproximation of the preputial skin

  3. Design and construction of superstructure in prestressed concrete cable-stayed bridge. ; Aomori Bay Bridge. PC shachokyo jobuko no sekkei to seko. ; Aomori Bay Bridge

    Energy Technology Data Exchange (ETDEWEB)

    Ishibashi, T.; Fujimori, S.; Oba, M.; Tsuyoshi, T. (East Japan Railway Co., Tokyo (Japan))

    1991-12-01

    Aomori Bay Bridge is a 1,219m long elevated bridge, a part of No.2 Bay Highway of 1,993m in total length crossing over Aomori railway station which was planned in ordecr to integrate the port facilities of Aomori Harbor and expedite cargo traffic smoothly. Of this Bay Bridge, its main bridge portion crossing over Aomori railway station and the sea area was planned as a continuous prestressed concrete cable-stayed bridge of 498m in total length and consisting of three portions including the central portion in which the main span between the central bridge piers was 240m. It is scheduled to open in the summer of 1992. With regard to the design of this bridge, special care for the view of the bridge has been taken covering from the structure style to the accessories. For this bridge, a large scale underground continuous wall solid base with a box-shaped section consisting of 6 chambers was adopted for the base of a main tower. It has the cantilever suspension structure of the wide girder with the inverted Y-shaped pylons. For its stav cable, was adopted a large capacity stay cable with standard tensile strength of 1,942 fabricated on the site and for its covering tube, a FRP tube was adopted. In this article, the construction of the main girder and stay cables, and the construction control during their installation by projection are reported. 7 refs., 14 figs., 9 tabs.

  4. Electrical cabling system associated at a nuclear reactor

    International Nuclear Information System (INIS)

    Dejeux, P.; Desfontaines, G.

    1988-01-01

    This cabling system for an electrical device in a nuclear reactor comprises at least a first cable issued of the device, a second cable comprising a first portion, a second portion and a third portion joining the second by a multiple quick fitting connector capable to connect at least ten second portions at ten other third portions of the second cable [fr

  5. Bending stresses: imposed on underground small diameter lines in city streets

    Energy Technology Data Exchange (ETDEWEB)

    Kottmann, A

    1975-05-01

    Die Technischen Werke der Stadt Stuttgart AG (TWS, Stuttgart) investigated the accuracy of available bending stress calculations to represent the actual stress exerted on underground pipelines, the effective bending intervals, and the pipe diameter required to effectively resist the expected stress. The investigation covers steel, cast iron, ductile cast iron, asbestos cement, and PVC 100. The theoretical stresses were determined by the Boussinesgne method from the effects of SLW60 vehicles on pipes buried 3.28 ft (1 m) underground. The cumulative load on the pipe was obtained as the total of the vehicle load, soil load, pipe load, and water load. Results indicate that the tensile stress from internal pipe pressure can be omitted, and that welded steel and sealed PVC pipes should account for longitudinal tensile stresses. Steel pipes are generally so oversized that they need not account for these stresses. The calculations also considered the interaction between the pipe and pipe joint as the pipe emerges from the trench for the 3 possible conditions: an overhang beam, a beam encased at one end and jointed at the other, and a beam, encased at both ends. The curves of the resisting moments varied according to the type of material and pipe diameter, with the greatest rate increase reported for asbestos cement, followed by PVC 100, cast iron, ductile cast iron, and steel. Operating data of a cast-iron underground TWS system in Stuttgart indicated that pipes with less than or equal to 4 in. ( less than or equal to 100 mm) nominal diameter were quite fragile while those with diameters >6 in. (>105 mm) sustained considerably less damage. The degree of damage was found to decrease with increasing diameters. The effect of temperature also proved important. Since it is not economically possible to reinstall the distribution lines with 8-in. (200-mm) pipes, elastic support systems such as crossing troughs are recommended to support the pipes in stress areas.

  6. Detection and mapping of buried waste

    International Nuclear Information System (INIS)

    Stahl, G.; Odenweller, J.; Huff, D.

    1996-01-01

    A major environmental concern today is the characterization, remediation, and monitoring of Federal waste sites, such as those operated by the Department of Energy (DOE). A significant amount of hazardous waste is buried at known sites on DOE reservations. Determining the exact location of buried waste trenches is an important step in the characterization and remediation of these sites. Remotely sensed imagery offers a rich source of information for accomplishing this task. This paper presents a case study conducted at Solid Waste Storage Area 4 (SWSA 4) at Oak Ridge National Laboratory. Historical aerial photography and recently collected multispectral imagery were analyzed to determine the precise locations of the buried trenches. A comparison of the results to recent ground measurements indicates the strengths and weaknesses of the remote sensing approach. Further analysis of these ground data also provides an understanding of the phenomenology that gives rise to the imagery signatures associated with the trenches. Application of these techniques can significantly reduce the costs of site remediation. By knowing the trench locations precisely, rather than the general locations, remediation alternatives to contain and isolate the waste materials can be tailored appropriately

  7. DOE complex buried waste characterization assessment

    International Nuclear Information System (INIS)

    Kaae, P.S.; Holter, G.M.; Garrett, S.M.K.

    1993-01-01

    The work described in this report was conducted by Pacific Northwest Laboratory to provide information to the Buried Waste Integrated Demonstration (BWID) program. The information in this report is intended to provide a complex-wide planning base for th.e BWID to ensure that BWID activities are appropriately focused to address the range of remediation problems existing across the US Department of Energy (DOE) complex. This report contains information characterizing the 2.1 million m 3 of buried and stored wastes and their associated sites at six major DOE facilities. Approximately 85% of this waste is low-level waste, with about 12% TRU or TRU mixed waste; the remaining 3% is low-level mixed waste. In addition, the report describes soil contamination sites across the complex. Some of the details that would be useful in further characterizing the buried wastes and contaminated soil sites across the DOE complex are either unavailable or difficult to locate. Several options for accessing this information and/or improving the information that is available are identified in the report. This document is a companion to Technology Needs for Remediation: Hanford and Other DOE Sites, PNL-8328 (Stapp 1993)

  8. In situ vitrification: Application to buried waste

    International Nuclear Information System (INIS)

    Callow, R.A.; Thompson, L.E.

    1991-01-01

    Two in situ vitrification field tests were conducted in June and July 1990 at Idaho National Engineering Laboratory. In situ vitrification is a technology for in-place conversion of contaminated soils into a durable glass and crystalline waste form and is being investigated as a potential remediation technology for buried waste. The overall objective of the two tests was to assess the general suitability of the process to remediate buried waste structures found at Idaho National Engineering Laboratory. In particular, these tests were designed as part of a treatability study to provide essential information on field performance of the process under conditions of significant combustible and metal wastes, and to test a newly developed electrode feed technology. The tests were successfully completed, and the electrode feed technology provided valuable operational control for successfully processing the high metal content waste. The results indicate that in situ vitrification is a feasible technology for application to buried waste. 2 refs., 5 figs., 2 tabs

  9. Versatile cable handling mechanisms for remote operator control

    Energy Technology Data Exchange (ETDEWEB)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D. [Portech Ltd., Portsmouth (United Kingdom)

    1996-12-31

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (Author).

  10. Versatile cable handling mechanisms for remote operator control

    International Nuclear Information System (INIS)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D.

    1996-01-01

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (Author)

  11. Versatile cable handling mechanisms for remote operator control

    International Nuclear Information System (INIS)

    Collie, A.A.; White, T.S.; Christopher, M.D.; Hewer, N.D.

    1996-01-01

    This paper describes a system of cable management for keeping the umbilical cables of remote operating vehicles and manipulators tidy and contained without direct intervention by operators. Two distinct types of winding mechanism have been designed. One mechanism is a fixed reel type where the cable is wound onto the reel by a rotating bail arm. The other mechanism consists of a pair of curved belts held against each other, between which cable is passed. The complete system includes tension measuring and slack loop take-up devices. The whole system is controlled by a servo system in conjunction with a PC based visual graphic environment which allows a variety of mechanisms to be built up into a system able to handle up to four umbilical cables simultaneously. The control system provides additional tension sensors and cable odometers connected to the control system so that the operator has immediate perception of all the cable parameters, and by defining rules, can set up a variety of alarm situations. (UK)

  12. External heating of electrical cables and auto-ignition investigation.

    Science.gov (United States)

    Courty, L; Garo, J P

    2017-01-05

    Electric cables are now extensively used for both residential and industrial applications. During more than twenty years, multi-scale approaches have been developed to study fire behavior of such cables that represents a serious challenge. Cables are rather complicated materials because they consist of an insulated part and jacket of polymeric materials. These polymeric materials can have various chemical structures, thicknesses and additives and generally have a char-forming tendency when exposed to heat source. In this work, two test methods are used for the characterization of cable pyrolysis and flammability. The first one permits the investigation of cable pyrolysis. A description of the cable mass loss is obtained, coupling an Arrhenius expression with a 1D thermal model of cables heating. Numerical results are successfully compared with experimental data obtained for two types of cable commonly used in French nuclear power plants. The second one is devoted to ignition investigations (spontaneous or piloted) of these cables. All these basic observations, measurements and modelling efforts are of major interest for a more comprehensive fire resistance evaluation of electric cables. Copyright © 2016 Elsevier B.V. All rights reserved.

  13. Numerical Modeling of Mechanical Behavior for Buried Steel Pipelines Crossing Subsidence Strata.

    Directory of Open Access Journals (Sweden)

    J Zhang

    Full Text Available This paper addresses the mechanical behavior of buried steel pipeline crossing subsidence strata. The investigation is based on numerical simulation of the nonlinear response of the pipeline-soil system through finite element method, considering large strain and displacement, inelastic material behavior of buried pipeline and the surrounding soil, as well as contact and friction on the pipeline-soil interface. Effects of key parameters on the mechanical behavior of buried pipeline were investigated, such as strata subsidence, diameter-thickness ratio, buried depth, internal pressure, friction coefficient and soil properties. The results show that the maximum strain appears on the outer transition subsidence section of the pipeline, and its cross section is concave shaped. With the increasing of strata subsidence and diameter-thickness ratio, the out of roundness, longitudinal strain and equivalent plastic strain increase gradually. With the buried depth increasing, the deflection, out of roundness and strain of the pipeline decrease. Internal pressure and friction coefficient have little effect on the deflection of buried pipeline. Out of roundness is reduced and the strain is increased gradually with the increasing of internal pressure. The physical properties of soil have a great influence on the mechanical properties of buried pipeline. The results from the present study can be used for the development of optimization design and preventive maintenance for buried steel pipelines.

  14. Global Pursuits: The Underground Railroad

    Science.gov (United States)

    School Arts: The Art Education Magazine for Teachers, 2004

    2004-01-01

    This brief article describes Charles T. Webber's oil on canvas painting, "The Underground Railroad, 1893." The subject of this painting is the Underground Railroad, which today has become an American legend. The Underground Railroad was not a systematic means of transportation, but rather a secretive process that allowed fugitive slaves…

  15. Elasticity and mechanical advantage in cables and ropes

    International Nuclear Information System (INIS)

    O'Shea, M J

    2007-01-01

    The conditions under which one can gain mechanical advantage by pulling with a force F perpendicular to a cable (or rope) that is fixed at both ends are examined. While this is a commonly discussed example in introductory physics classes, its solution in terms of fundamental properties of the cable requires one to model the elasticity of the cable. This solution has several complex and interesting features, e.g. a large increase in the tension in the cable may occur upon application of F if (i) F lies in a certain range and (ii) the initial tension T 1 in the cable (before F is applied) satisfies T 1 < 0.0340 κ. Here, κ is the spring constant of a unit length of the cable. For steel cables and cables composed of other materials such as carbon nanorods where the elasticity is low, significant increases in tension are possible. Examples involving walking a tightrope and attempting to increase the tension in a rope hauling a load are considered. Two programs to solve the equations of this work are available in the electronic version of this journal

  16. Remote Acquisition Amplifier For 50-Ohm Cable

    Science.gov (United States)

    Amador, Jose J.

    1995-01-01

    Buffer-amplifier unit designed to drive 50-Ohm cables up to 100 ft. (30 m) long, compensating for attenuation in cables and enabling remote operation of oscilloscopes. Variable resistor provides for adjustment of gain of amplifier, such that overall gain from input terminals of amplifier to output end of cable set to unity.

  17. Comparison of programmed and cabled re-entrance systems. Elaboration of cabled re-entrance system for a CII 90.40; Comparaison des systemes de reentrance programmes et cables. Realisation d'un systeme de reentrance cable pour un CII 90.40

    Energy Technology Data Exchange (ETDEWEB)

    Perraudeau, Jean

    1976-11-26

    The objective of this research thesis is to study problems related to re-entrance, and, more particularly, to study a re-entrance system for a CII 90.40 computer. Such a system can be realised under a programmed or cabled form, and both approaches are described and compared. A generalisation of this comparison is briefly proposed. As the computer already possesses a programmed re-entrance system, the author focuses on the study of the cabled re-entrance system which results in an improvement of performance and possibilities provided by this computer, particularly for its use in real time. The design, realisation and development of such a cabled system are reported. A first part reports a theoretical study on re-entrance (definition, problems, applications), a presentation of the computer, a description of the programmed re-entrance system, a presentation of the principle of the chosen cabled re-entrance system, a definition of the structure and operating mode of the cabled pile and a description of its various components, and a flowchart analysis of function execution. The second part reports the practical realisation: definition, technological overview, technology used in the cabled pile, sequencing and multiplexing principle, impulse transmission, logical layouts, and circuit adjustments. The third part presents practical example. An assessment and perspectives are finally discussed.

  18. Rokibaar Underground = Rock bar Underground

    Index Scriptorium Estoniae

    2008-01-01

    Rokibaari Underground (Küütri 7, Tartu) sisekujundus, mis pälvis Eesti Sisearhitektide Liidu 2007. a. eripreemia. Sisearhitekt: Margus Mänd (Tammat OÜ). Margus Männist, tema tähtsamad tööd. Plaan, 5 värv. vaadet, foto M. Männist

  19. Behaviour of electrical cables under fire conditions

    International Nuclear Information System (INIS)

    Bertrand, R.; Chaussard, M.; Gonzalez, R.; Lacoue, J.; Mattei, J.M.; Such, J.M.

    2002-01-01

    A Fire Probabilistic Safety Assessment - called the Fire PSA - is being carried out by the French Institute of Radiological Protection and Nuclear Safety (IPSN) to be used in the framework of the safety assessment of operating 900 MWe PWRs. The aim of this study is to evaluate the core damage conditional probability which could result from a fire. A fire can induce unavailability of safety equipment, notably damaging electrical cables introducing a significant risk contributor. The purpose of this paper is to present the electrical cable fire tests carried out by IPSN to identify the failure modes and to determine the cable damage criteria. The impact of each kind of cable failure mode and the methodology used to estimate the conditional probability of a failure mode when cable damage occurred is also discussed. (orig.) [de

  20. Light Water Reactor Sustainability Program: Evaluation of Localized Cable Test Methods for Nuclear Power Plant Cable Aging Management Programs

    Energy Technology Data Exchange (ETDEWEB)

    Glass, Samuel W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fifield, Leonard S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hartman, Trenton S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-05-30

    This Pacific Northwest National Laboratory (PNNL) milestone report describes progress to date on the investigation of nondestructive test (NDE) methods focusing particularly on local measurements that provide key indicators of cable aging and damage. The work includes a review of relevant literature as well as hands-on experimental verification of inspection capabilities. As NPPs consider applying for second, or subsequent, license renewal (SLR) to extend their operating period from 60 years to 80 years, it important to understand how the materials installed in plant systems and components will age during that time and develop aging management programs (AMPs) to assure continued safe operation under normal and design basis events (DBE). Normal component and system tests typically confirm the cables can perform their normal operational function. The focus of the cable test program is directed toward the more demanding challenge of assuring the cable function under accident or DBE. Most utilities already have a program associated with their first life extension from 40 to 60 years. Regrettably, there is neither a clear guideline nor a single NDE that can assure cable function and integrity for all cables. Thankfully, however, practical implementation of a broad range of tests allows utilities to develop a practical program that assures cable function to a high degree. The industry has adopted 50% elongation at break (EAB) relative to the un-aged cable condition as the acceptability standard. All tests are benchmarked against the cable EAB test. EAB is a destructive test so the test programs must apply an array of other NDE tests to assure or infer the overall set of cable’s system integrity. These cable NDE programs vary in rigor and methodology. As the industry gains experience with the efficacy of these programs, it is expected that implementation practice will converge to a more common approach. This report addresses the range of local NDE cable tests that are

  1. 46 CFR 111.12-9 - Generator cables.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Generator cables. 111.12-9 Section 111.12-9 Shipping... REQUIREMENTS Generator Construction and Circuits § 111.12-9 Generator cables. (a) The current-carrying capacity of generator cables must not be: (1) Less than 115 percent of the continuous generator rating; or (2...

  2. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  3. Development of scaling rules for Rutherford type superconducting cables

    International Nuclear Information System (INIS)

    Royet, J.M.; Scanlan, R.M.

    1991-01-01

    During the R and D phase of the Superconducting Supercollider (SSC) program, LBL was responsible for establishing the parameters for cables used in SSC dipole and quadrupole magnets. In addition, LBL has collaborated with Fermi National Accelerator Laboratory on the design and fabrication of a new cable for use in the Low Beta Quadrupoles. As a result of the development work on these and other cables, we have arrived a set of scaling rules which provide guidelines for choosing the parameters for a wide range of superconducting cables. These parameters include strand size, strand number, keystone angle, percent compaction, cable pitch and compacted cable dimensions. In addition, we have defined the tolerance ranges for the key cable manufacturing parameters such as mandrel size and shape, strand tension, and Turkshead temperature control. In this paper, the authors present the results on cables ranging from 8 strands to 36 strands of 0.65mm wire and from 8 strands to 30 strands of 0.8mm wire. The authors use these results to demonstrate the application of the scaling rules for Rutherford-type cable

  4. Development of scaling rules for Rutherford type superconducting cables

    International Nuclear Information System (INIS)

    Royet, J.M.; Scanlan, R.M.

    1990-09-01

    During the R ampersand D phase of the Superconducting Supercollider (SSC) program, LBL was responsible for establishing the parameters for cables used in SSC dipole and quadrupole magnets. In addition, the design and fabrication of a new cable for use in the Low Beta Quadrupoles. As a result of the development work on these and other cables, we have arrived a set of scaling rules which provide guidelines for choosing the parameters for a wide range of superconducting cables. These parameters include strand size, strand number, keystone angle, percent compaction, cable pitch and compacted cable dimensions. In addition, we have defined the tolerance ranges for the key cable manufacturing parameters such as mandrel size and shape, stand tension, and Turkshead temperature control. In this paper, we present the results on cables ranging from 8 strands to 36 strands of 0.65mm wire and from 8 strands to 30 strands of 0.8mm wire. We use these results to demonstrate the application of the scaling rules for Rutherford-type cable

  5. The underground economy in Romania

    Directory of Open Access Journals (Sweden)

    Adriana Veronica LITRA

    2016-07-01

    Full Text Available The paper aims at covering issues related to the underground economy, activities that compound this phenomenon, its magnitude in Romania and reported to the European average. Underground economy in Romania consists of undeclared work (2/3 from the total and unreported income; it decreased from 33.6% of GDP in 2003 to 28% in 2014, but remained over EU-28 average with about 10 p.p. Among EU-28 countries, only Bulgaria exceeds the size of the underground economy of Romania. The underground economy is a challenge for the leadership of the state which must act simultaneously to stop illegal activities, and to discourage non-declaration of the legal activities. Corruption favours maintaining the underground economy, delays economic development, obstructs democratic processes and affects justice and the law state.

  6. Locating underground uranium deposits

    International Nuclear Information System (INIS)

    Felice, P.E.

    1979-01-01

    Underground uranium deposits are located by placing wires of dosimeters each about 5 to 18 mg/cm 2 thick underground in a grid pattern. Each dosimeter contains a phosphor which is capable of storing the energy of alpha particles. In each pair one dosimeter is shielded from alpha particles with more than 18 mg/cm 2 thick opaque material but not gamma and beta rays and the other dosimeter is shielded with less than 1 mg/cm 2 thick opaque material to exclude dust. After a period underground the dosimeters are heated which releases the stored energy as light. The amount of light produced from the heavily shielded dosimeter is subtracted from the amount of light produced from the thinly shielded dosimeter to give an indication of the location and quantity of uranium underground

  7. Data Base On Cables And Connectors

    Science.gov (United States)

    Bowen, Arlen R.; Oliver, John D.

    1995-01-01

    Report describes Connector Adapter Cable Information Data Base (CONNAID) computer program, managing data base containing necessary information concerning electrical connectors, breakout boxes, adapter cables, backshells, and pertinent torque specifications for engineering project.

  8. Development of road hydronic snow-ice melting system with solar energy and seasonal underground thermal energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Gao, Q.; Liu, Y.; Ma, C.Q.; Li, M.; Huang, Y.; Yu, M. [Jilin Univ., Changchun (China). Dept. of Thermal Energy Engineering; Liu, X.B. [Climate Master Inc., OK (United States)

    2008-07-01

    Snow and ice melting technologies that used thermal energy storage were explored. The study included analyses of solar heat slab, seasonal underground thermal energy storage, and embedded pipe technologies. Different road materials, roadbed construction methods, and underground rock and soil conditions were also discussed. New processes combining all 3 of the main technologies were also reviewed. Other thermal ice melting technologies included conductive concrete and asphalt; heating cables, and hydronic melting systems. Geothermal energy is increasingly being considered as a means of melting snow and ice from roads and other infrastructure. Researchers have also been focusing on simulating heat transfer in solar collectors and road-embedded pipes. Demonstration projects in Japan, Switzerland, and Poland are exploring the use of combined geothermal and solar energy processes to remove snow and ice from roads. Research on hydronic melting technologies is also being conducted in the United States. The study demonstrated that snow-ice melting energy storage systems will become an important and sustainable method of snow and ice removal in the future. The technology efficiently uses renewable energy sources, and provides a cost-effective means of replacing or reducing chemical melting agents. 33 refs., 1 fig.

  9. Manufacturing experience for the LHC inner triplet quadrupole cables

    CERN Document Server

    Scanlan, R M; Bossert, R; Kerby, J S; Ghosh, A K; Boivin, M; Roy, T

    2002-01-01

    The design for the U.S. LHC Inner Triplet Quadrupole magnet requires a 37 strand (inner layer) and a 46 strand (outer layer) cable. This represents the largest number of strands attempted to date for a production quantity of Rutherford-type cable. The cable parameters were optimized during the production of a series of short prototype magnets produced at FNAL. These optimization studies focused on critical current degradation, dimensional control, coil winding, and interstrand resistance. After the R&D phase was complete, the technology was transferred to NEEW and a new cabling machine was installed to produce these cables. At present, about 60 unit lengths, out of 90 required for the entire production series of magnets, have been completed for each type of cable. The manufacturing experience with these challenging cables will be reported. Finally, the implications for even larger cables, with more strands, will be discussed. (8 refs).

  10. Cable Television in Sedalia, Missouri.

    Science.gov (United States)

    Lamkin, Kathryn Janel

    A field study was conducted of the status of cable television in Sedalia, Missouri. Based on interviews of city council members and staff members of Cablevision, the Sedalia cable franchise holder, the following issues were investigated: (1) subscription rates; (2) franchise negotiations; (3) quality of existing services; and (4) possible…

  11. High power cable with internal water cooling 400 kV

    Science.gov (United States)

    Rasquin, W.; Harjes, B.

    1982-08-01

    Due to the concentration of electricity production in large power plants, the need of higher power transmissions, and the protection of environment, developement of a 400 kV water cooled cable in the power range of 1 to 5 GVA was undertaken. The fabrication and testing of equipment, engineering of cable components, fabrication of a test cable, development of cable terminal laboratory, testing of test cable, field testing of test cable, fabrication of industrial cable laboratory, testing of industrial cable, field testing of industrial cable, and system analysis for optimization were prepared. The field testing was impossible to realize. However, it is proved that a cable consisting of an internal stainless steel water cooled tube, covered by stranded copper profiles, insulated with heavy high quality paper, and protected by an aluminum cover can be produced, withstand tests accordingly to IEC/VDE recommendations, and is able to fulfill all exploitation conditions.

  12. CSNS control cable information management system based on web

    International Nuclear Information System (INIS)

    Lu Huihui; Wang Chunhong; Li Luofeng; Liu Zhengtong; Lei Bifeng

    2014-01-01

    This paper presents an approach to data modeling a great number of control devices and cables with complicated relations of CSNS (China Spallation Neutron Source). The CSNS accelerator control cable database was created using MySQL, and the control cable information management system based on Web was further built. During the development of the database, the design idea of IRMIS database was studied. and the actual situation of CSNS accelerator control cables was investigated. The control cable database model fitting the requirements was designed. This system is of great convenience to manage and maintain CSNS control devices and cables in the future. (authors)

  13. Cable-to-post attachments for use in non-proprietary high-tension cable median barrier - phase II.

    Science.gov (United States)

    2016-03-24

    The objective of this study was to reevaluate and improve the existing cable-to-post attachment hardware that is utilized : in the non-proprietary cable barrier being developed at MwRSF. The study focused on redesigning the bolted, tabbed : bracket (...

  14. Concept of underground nuclear power plant

    International Nuclear Information System (INIS)

    Onishi, Sotoaki

    1976-01-01

    The concept of constructing nuclear power plants on the sea or underground as the future sitting is based on moving the present power plants on the ground with actual results to the sea or underground without changing the design. The underground nuclear power plants have many similar points to underground hydro-electric power stations with many achievements in the construction viewpoint, though they have their proper difficult problems. Of course, it requires to excavate larger underground caves than the case of underground hydro-electric power plants. The maximum dimensions of the caves have been determined through experience in practice. Therefore the developments of design theory and construction technique are desirable in this field. In discussing underground construction, two evaluating methods are considered for the shielding effect of base rocks. The minimum vertical distance up to ground surface from the center of the cave differs depending upon the in-cave pressure, and the conditions of base rock, soil and underground water in case of the accident assumed in the design, and is approximately 60m, if the cave is assumed to be an indefinite cylindrical shape, by the safer side calculation in the above two evaluations. (Wakatsuki, Y.)

  15. Practical cable tension adjustment based upon the satisfaction concept of bridge designers; Sekkeisha no manzokudo wo koryo shita fuzzy cable choryoku choseiho

    Energy Technology Data Exchange (ETDEWEB)

    Kaneyoshi, M.; Tanaka, H. [Hitachi Zosen, Tokyo (Japan)] Furuta, H. [Kansai Univ., Osaka (Japan)

    1998-07-21

    Cable tension adjustment of bridge beam of cable stayed bridge and so forth that uses cable as a structural element is classified into (1) pre-stress adjustment of cable at design level, (2) slim adjustment required at erection level. The former deals with the structurally high dimensional statically indeterminate structures like cable-stayed bridges and is a process for carrying out economical design by making the stress resultant of main girder small due to the introduction of appropriate pre-stress stress on this cable. The later is the process of getting rid off the errors caused in cable tension and camber of girder and tower regarding various errors such as design, fabrication and erection errors. The authors developed analysis method using fuzzy regression analysis and this has been applied in number of practical bridges. In this research, much more practical method is developed where the aspire of designer can be introduced easily by applying the satisfaction concept. By using this, pre-stress adjustment and shim adjustment of cable can be possible in a practical way. 9 refs., 7 figs., 8 tabs.

  16. Development of low-smoke, flame-retarding cables

    International Nuclear Information System (INIS)

    Kato, H.; Kanemitsuya, K.; Furukawa, K.; Mio, K.

    1983-01-01

    A great deal of attention has been given to the potential fire hazard of combustion gases from organic materials. Although cable industries have developed flame-retarding organic materials for the insulation and jacketing of wires and cables, there was insufficient prevention of toxic gas formation during combustion. To cope with these problems associated with conventional PVC cables, the authors have directed to develop low-smoke, flame-retarding plasticized PVC formulations retaining the original mechanical, electrical and aging properties. A series of basic investigations on smoke suppression followed by an evaluation on practical cables could indicate some effective means to end these problems. This paper describes the results and discussion on smoke suppressing study of plasticized PVC as well as behavior and characteristics of the low-smoke, flame-retarding PVC wires and cables using these materials. (author)

  17. Losses in armoured three-phase submarine cables

    DEFF Research Database (Denmark)

    Ebdrup, Thomas; Silva, Filipe Miguel Faria da; Bak, Claus Leth

    2014-01-01

    The number of offshore wind farms will keep increasing in the future as a part of the shift towards a CO2 free energy production. The energy harvested from the wind farm must be brought to shore, which is often done by using a three-phase armoured submarine power cable. The use of an armour...... increases the losses in armoured cables compared to unarmoured cables. In this paper a thorough state of the art analysis is conducted on armour losses in three-phase armoured submarine power cables. The analysis shows that the IEC 60287-1-1 standard overestimates the armour losses which lead...... to the installation of cables with excessive phase conductor cross section. This paper also presents an example of the potential economic benefits of having a better knowledge of the losses introduced by the armour....

  18. Problems with earth fault detecting relays assigned to parallel cables or overhead lines; Probleme bei der Erdschlussortung mit wattmetrischen Erdschlussrichtungsrelais bei parallelen Kabeln oder Leitungen

    Energy Technology Data Exchange (ETDEWEB)

    Birkner, P.; Foerg, R. [Lech-Elektrizitaetswerke AG, Augsburg (Germany)

    1998-06-29

    For practical conditions one can find currents in underground electrical conductors like cable coverings earthed on both sides. As an example these currents are due to the alternating current system of the railroad or to the alternating current system of a Peterson coil, that tries to find a minimum resistance way from the transformer station to the place of the earth fault. Currents like these create a series voltage in the cable by inductive coupling. The voltage depends on the type and the length of the cable. The series voltages of all three phases form a zero sequence system. Taking into consideration that two cable systems running parallel to another, under certain circumstances it is possible to achieve a circulating zero sequence current. Additionally there is a shift voltage between the neutral point and the earth in the case of an earth fault in another place in the grid. The combination of these two factors can cause a malfunction of the earth fault detecting relays that are assigned to the parallel cable system. (orig.) [Deutsch] Im Erdreich vorhandene elektrische Leiter, z.B. die beidseitig geerdeten Schirme von Energiekabeln, werden in der Praxis nicht selten von Stroemen beaufschlagt. Dabei kann es sich z.B. auch um den Wechselstrom einer Petersenspule, der sich im Erdschlussfall einen widerstandsminimierten Weg vom Umspannwerk zur Fehlerstelle sucht, handeln. Ueber induktive Einkopplung entsteht im Leiter des Kabels eine Laengsspannung. Deren Hoehe ist vom Kabeltyp und der Kabellaenge abhaengig. Liegt als Netzkonfiguration eine Doppelleitung vor, die parallel betrieben wird, so koennen sich unter gewissen Randbedingungen kreisende Nullstroeme ausbilden. Diese wiederum koennen bei Vorhandensein einer Verlagerungsspannung zu einem Fehlansprechen von wattmetrischen Erdschlussrichtungsrelais fuehren. (orig.)

  19. Prevention of cable fires in nuclear power plants

    International Nuclear Information System (INIS)

    Murota, George; Yajima, Kazuo

    1979-01-01

    Nuclear power generation is indispensable to secure required electric power, therefore double or triple safety measures are necessary to prevent serious accidents absolutely. As for the countermeasures to cable fires, interest grew rapidly with the fire in Browns Ferry Power Station in USA in 1975 as the turning point, because multi-strand grouped cables caused to promote the spread of fire. In Japan, also the fire prevention measures for wires and cables were more strengthened, and the measures for preventing the spread of cable fires with the agent preventing the spread of fires have occupied the important position. When multi-strand cables are ignited by some cause, the fire spreads with very large combustion force along wirings to other rooms and installations, and electric systems are broken down. The harmful corrosive gas generated from the burning coating materials of cables diffuses very quickly. In nuclear power stations, the cables which are very hard to burn are adopted, fire prevention sections are established positively, the fire-resisting capability of fire prevention barriers is reviewed, and fire-resisting and smoke-preventing treatments are applied to the parts where cables penetrate walls, floors or ceilings. The paint and the sealing material which prevent the spread of fires are introduced. (Kako, I.)

  20. Underground water stress release models

    Science.gov (United States)

    Li, Yong; Dang, Shenjun; Lü, Shaochuan

    2011-08-01

    The accumulation of tectonic stress may cause earthquakes at some epochs. However, in most cases, it leads to crustal deformations. Underground water level is a sensitive indication of the crustal deformations. We incorporate the information of the underground water level into the stress release models (SRM), and obtain the underground water stress release model (USRM). We apply USRM to the earthquakes occurred at Tangshan region. The analysis shows that the underground water stress release model outperforms both Poisson model and stress release model. Monte Carlo simulation shows that the simulated seismicity by USRM is very close to the real seismicity.

  1. Loss and Inductance Investigation in Superconducting Cable Conductors

    DEFF Research Database (Denmark)

    Olsen, Søren Krüger; Tønnesen, Ole; Træholt, Chresten

    1999-01-01

    An important parameter in the design and optimization of a superconducting cable conductor is the control of the current distribution among single tapes and layers. This distribution is to a large degree determined by inductances, since the resistances are low. The self and mutual inductances...... of transport current and current distribution.This presentation is based on a number of experiments performed on prototype superconducting cable conductors. The critical current (1uV/cm) of the conductor at 77K was 1590 A (cable #1) and 3240 A (cable #2) respectively.At an rms current of 2 kA (50 Hz) the AC......-loss was measured on cable #2 to 0.6W/mxphase. This is, to our knowledge, the lowest AC-loss (at 2kA and 77K) of a high temperature superconducting cable conductor reported so far....

  2. Frequency analysis of a tower-cable coupled system

    Energy Technology Data Exchange (ETDEWEB)

    Park, Moo Yeol [Young Sin Precision Engineering Ltd., Gyungju (Korea, Republic of); Kim, Seock Hyun; Park, In Su [Kangwon National University, Chuncheon (Korea, Republic of); Cui, Chengxun [Yanbian University, Yangji (China)

    2013-06-15

    This study considers the prediction of natural frequency to avoid resonance in a wind turbine tower- cable coupled system. An analytical model based on the Rayleigh-Ritz method is proposed to predict the resonance frequency of a wind turbine tower structure supported by four guy cables. To verify the validity of the analytical model, a small tower-cable model is manufactured and tested. The frequency and mode data of the tower model are obtained by modal testing and finite element analysis. The validity of the proposed method is verified through the comparison of the frequency analysis results. Finally, using a parametric study with the analytical model, we identified how the cable tension and cable angle affect the resonance frequency of the wind turbine tower structure. From the analysis results, the tension limit and optimal angle of the cable are identified.

  3. Aging management and life assessment of buried commodities in nuclear power plants

    International Nuclear Information System (INIS)

    Park, J. H.; Jung, I. S.; Jo, H. S.; Kim, M. G.; Kim, S. T.; Lee, S. S.

    2000-01-01

    General field survey, inspection and life assessment were performed to establish effective aging management program of buried commodities in nuclear power plant. Basic informations on material characteristics, aging degradation experiences and maintenance history were gathered. Considering their degradation effects on power operation or safety, buried commodities were screened for the aging management priority. Various inspection techniques were applied in field survey and inspection, and their results were incorporated in the life assessment of buried commodities. In the aspect of aging degradation, general status of buried commodities were considered still sound while some revealed local degradation

  4. 24 CFR 3285.704 - Telephone and cable TV.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Telephone and cable TV. 3285.704....704 Telephone and cable TV. Refer to § 3285.906 for considerations pertinent to installation of telephone and cable TV. ...

  5. Response of steel buried pipeline to the three dimensional fault movement

    International Nuclear Information System (INIS)

    Zia Tohidi, R.; Shakib, H.

    2003-01-01

    Fault movement during an earthquake may have severe effect on buried pipelines as a lifeline element. A few studies are carried out on the behaviour of buried pipelines to this kind of damage and disruption. In most of these studies, the fault movements are modeled as two-dimensional. In this study, by modeling the pipe as a beam and the surrounding soil as nonlinear springs, the effect of three dimensional movement of fault on buried pipelines is investigated. Some important parameters such as; fault movement, depth of buried, geometrical characteristics of the pipe, angle of pipe- soil friction, angle of pipe- fault crossing, and the fault slip are considered in this study

  6. In situ vitrification of buried waste: Containment issues and suppression systems

    International Nuclear Information System (INIS)

    Luey, J.; Powell, T.D.

    1992-03-01

    Pacific Northwest Laboratory (PNL) and Idaho National Engineering Laboratory (INEL) are developing a remedial action technology for buried waste through the adaptation of the in situ vitrification (ISV) process. The ISV process is a thermal treatment process originally developed for the US Department of Energy (DOE) to stabilize soils contaminated with transuranic waste. ISV tests with buried waste forms have demonstrated that the processing of buried waste is more dynamic than the processing of soils. This paper will focus on the issue of containment of the gases released during the processing of buried waste and on engineered suppression systems to alleviate transient events associated with dynamic off-gassing from the ISV melt

  7. In situ vitrification of buried waste: Containment issues and suppression systems

    International Nuclear Information System (INIS)

    Luey, J.; Powell, T.D.

    1992-01-01

    Pacific Northwest Laboratory (PNL) and Idaho National Engineering Laboratory (INEL) are developing a remedial action technology for buried waste through the adaptation of the in situ vitrification (ISV) process. The ISV process is a thermal treatment process originally developed for the U.S. Department of Energy (DOE) to stabilize soils contaminated with transuranic waste. ISV tests with buried waste forms have demonstrated that the processing of buried waste is more dynamic than the processing of soils. This paper will focus on the issue of containment of the gases released during the processing of buried waste and on engineered suppression systems to alleviate transient events associated with dynamic off-gassing from the ISV melt. (author)

  8. The optimum spanning catenary cable

    Science.gov (United States)

    Wang, C. Y.

    2015-03-01

    A heavy cable spans two points in space. There exists an optimum cable length such that the maximum tension is minimized. If the two end points are at the same level, the optimum length is 1.258 times the distance between the ends. The optimum lengths for end points of different heights are also found.

  9. Electron spin resonance characterization of trapping centers in Unibond reg-sign buried oxides

    International Nuclear Information System (INIS)

    Conley, J.F. Jr.; Lenahan, P.M.; Wallace, B.D.

    1996-01-01

    Electron spin resonance and capacitance vs. voltage measurements are used to evaluate the radiation response of Unibond buried oxides. When damaged by hole injection, it is found that Unibond reg-sign buried oxides exhibit a rough correspondence between E' centers and positive charge as well as generation of P b centers at the Unibond buried oxide/Si interface. In these respects, Unibond buried oxides qualitatively resemble thermal SiO 2 . However, a hydrogen complexed E' center known as the 74 G doublet is also detected in the Unibond buried oxides. This defect is not detectable in thermal SiO 2 under similar circumstances. Since the presence of 74 G doublet center is generally indicative of very high hydrogen content and since hydrogen is clearly a significant participant in radiation damage, this result suggests a qualitative difference between the radiation response of Unibond and thermal SiO 2 . Unibond results are also compared and contrasted with similar investigations on separation-by-implanted-oxygen (SIMOX) buried oxides. Although the charge trapping response of Unibond buried oxides may be inferior to that of radiation hardened thermal SiO 2 , it appears to be more simple and superior to that of SIMOX buried oxides

  10. Applicability of Related Data, Algorithms, and Models to the Simulation of Ground-Coupled Residential Hot Water Piping in California

    International Nuclear Information System (INIS)

    Warner, J.L.; Lutz, J.D.

    2006-01-01

    Residential water heating is an important consideration in California?s building energy efficiency standard. Explicit treatment of ground-coupled hot water piping is one of several planned improvements to the standard. The properties of water, piping, insulation, backfill materials, concrete slabs, and soil, their interactions, and their variations with temperature and over time are important considerations in the required supporting analysis. Heat transfer algorithms and models devised for generalized, hot water distribution system, ground-source heat pump and ground heat exchanger, nuclear waste repository, buried oil pipeline, and underground electricity transmission cable applications can be adapted to the simulation of under-slab water piping. A numerical model that permits detailed examination of and broad variations in many inputs while employing a technique to conserve computer run time is recommended.

  11. Low Friction Cryostat for HTS Power Cable of Dutch Project

    NARCIS (Netherlands)

    Chevtchenko, O.; Zuijderduin, R.; Smit, J.; Willen, D.; Lentge, H.; Thidemann, C.; Traeholt, C.

    2012-01-01

    Particulars of 6 km long HTS AC power cable for Amsterdam project are: a cable has to fit in an annulus of 160 mm, with only two cooling stations at the cable ends [1]. Application of existing solutions for HTS cables would result in excessively high coolant pressure drop in the cable, possibly

  12. Copper Cable Recycling Technology. Innovative Technology Summary Report

    International Nuclear Information System (INIS)

    2001-01-01

    The United States Department of Energy (DOE) continually seeks safer and more cost-effective technologies for use in deactivation and decommissioning (D and D) of nuclear facilities. The Deactivation and Decommissioning Focus Area (DDFA) of the DOE's Office of Science and Technology (OST) sponsors large-scale demonstration and deployment projects (LSDDPs). At these LSDDPs, developers and vendors of improved or innovative technologies showcase products that are potentially beneficial to the DOE's projects and to others in the D and D community. Benefits sought include decreased health and safety risks to personnel and the environment, increased productivity, and decreased costs of operation. The Idaho National Engineering and Environmental Laboratory (INEEL) generated a list of statements defining specific needs and problems where improved technology could be incorporated into ongoing D and D tasks. One such need is to reduce the volume of waste copper wire and cable generated by D and D. Deactivation and decommissioning activities of nuclear facilities generates hundreds of tons of contaminated copper cable, which are sent to radioactive waste disposal sites. The Copper Cable Recycling Technology separates the clean copper from contaminated insulation and dust materials in these cables. The recovered copper can then be reclaimed and, more importantly, landfill disposal volumes can be reduced. The existing baseline technology for disposing radioactively contaminated cables is to package the cables in wooden storage boxes and dispose of the cables in radioactive waste disposal sites. The Copper Cable Recycling Technology is applicable to facility decommissioning projects at many Department of Energy (DOE) nuclear facilities and commercial nuclear power plants undergoing decommissioning activities. The INEEL Copper Cable Recycling Technology Demonstration investigated the effectiveness and efficiency to recycle 13.5 tons of copper cable. To determine the effectiveness

  13. Development of radiation resistant PEEK insulation cable

    International Nuclear Information System (INIS)

    Mio, Keigo; Ogiwara, Norio; Hikichi, Yusuke; Furukori, Hisayoshi; Arai, Hideyuki; Nishizawa, Daiji; Nishidono, Toshiro

    2009-04-01

    Material characterization and development has been carried out for cable insulation suitable for use in the J-PARC 3-GeV RCS radiation environment. In spite of its high cost, PEEK (polyether-ether-ketone) has emerged as the leading candidate satisfying requirements of being non-halogen based, highly incombustible and with radiation resistant at least 10 MGy, along with the usual mechanical characteristics such as good elongation at break, which are needed in a cable insulation. Gamma-ray irradiation tests have been done in order to study radiation resistance of PEEK cable. Further, mechanical, electrical and fire retardant characteristics of a complete cable such as would be used at the J-PARC RCS were investigated. As a result, PEEK cables were shown to be not degraded by radiation up to at least 10 MGy, and thus could be expected to operate stably under the 3-GeV RCS radiation environment. (author)

  14. Development of environmental-friendly wire and cable

    International Nuclear Information System (INIS)

    Ueno, Keiji

    1996-01-01

    The electron beam technology has been used in many industrial fields as a method of conventional polymer modification or optimum processability. The main industrial fields of radiation crosslinking are wire and cable, heat shrinkable tubings, plastic foams, precuring of tires, floppy disk curing, foods packaging films, and so on. The radiation crosslinking of wire and cable was started in 1961 in Japan and 15 wire and cable companies are now using electron beam accelerators for production or R and D. The dominant characteristics of crosslinking of insulation materials are application at high temperature, good oil and chemical resistibility and high mechanical properties. These radiation crosslinking wire and cable are applied widely in electronics equipments and automobiles. Recently, electronics manufacturers have indicated deep concern over the effects on the environment. Wire and cable also are required to be applicable for environmental preservation. (J.P.N.)

  15. Defying c-Abl signaling circuits through small allosteric compounds

    Directory of Open Access Journals (Sweden)

    Stefania eGonfloni

    2014-11-01

    Full Text Available Many extracellular and intracellular signals promote the c-Abl tyrosine kinase activity. c-Abl in turn triggers a multitude of changes either in protein phosphorylation or in gene expression in the cell. Yet, c-Abl takes part in diverse signaling routes because of several domains linked to its catalytic core. Complex conformational changes turn on and off its kinase activity. These changes affect surface features of the c-Abl kinase and likely its capability to bind actin and/or DNA. Two specific inhibitors (ATP-competitive or allosteric compounds regulate the c-Abl kinase through different mechanisms. NMR studies show that a c-Abl fragment (SH3-SH2-linker-SH1 adopts different conformational states upon binding to each inhibitor. This supports an unconventional use for allosteric compounds to unraveling physiological c-Abl signaling circuits.

  16. EHV AC undergrounding electrical power performance and planning

    CERN Document Server

    Benato, Roberto

    2014-01-01

    Analytical methods of cable performance in EHV AC electrical power are discussed in this comprehensive reference. Descriptions of energization, power quality, cable safety constraints and more, guide readers in cable planning and power network operations.

  17. 'Hydrotechnical' problems of burying radioactive waste

    International Nuclear Information System (INIS)

    Nagy, Z.; Buday, G.

    2008-01-01

    The paper describes the design and construction problems of an underground storage facility of nuclear wastes. Special attention ids paid to the role of underground water. After detailed surveys the construction works of the Hungarian Radioactive Waste Storage Facility at Bataapati begun in 2005. The construction of the two 1700 m long inclines are near to the level of the planned storage chambers, today. (TRA)

  18. Method of exchanging cables of neutron monitoring instrumentation tube and folding device of the cable

    International Nuclear Information System (INIS)

    Sakamaki, Kazuo.

    1990-01-01

    In a BWR type reactor, a wide range monitor (WRNM) is used instead of a conventional neutron source range monitor (SRM) or an intermediate range monitor (IRM). The WRNM is always fixed to a predetermined position in a reactor core while containing a detection section in a dry tube, different from a conventional monitor. Accordingly, driving devices for the conventional detection section such as in SRM and IRM are not necessary but, when the reactor is operated for a long period of time, it is sometimes necessary to be replaced with new WRNM. According to the present invention, the cable of the detector placed in a neutron instrumentation tube is connected to a cable take-up drum in a take-up device passing through a cask. Then, the cable is taken-up by driving the take-up drum by a driving motor and the WRNM detection section attached to the top end of the cable is contained in the cask. With this constitution, replacing and processing operation for the detection section can be facilitated and operator's exposure dose can be reduced. (I.S.)

  19. Total Magnetic Field Signatures over Submarine HVDC Power Cables

    Science.gov (United States)

    Johnson, R. M.; Tchernychev, M.; Johnston, J. M.; Tryggestad, J.

    2013-12-01

    Mikhail Tchernychev, Geometrics, Inc. Ross Johnson, Geometrics, Inc. Jeff Johnston, Geometrics, Inc. High Voltage Direct Current (HVDC) technology is widely used to transmit electrical power over considerable distances using submarine cables. The most commonly known examples are the HVDC cable between Italy and Greece (160 km), Victoria-Tasmania (300 km), New Jersey - Long Island (82 km) and the Transbay cable (Pittsburg, California - San-Francisco). These cables are inspected periodically and their location and burial depth verified. This inspection applies to live and idle cables; in particular a survey company could be required to locate pieces of a dead cable for subsequent removal from the sea floor. Most HVDC cables produce a constant magnetic field; therefore one of the possible survey tools would be Marine Total Field Magnetometer. We present mathematical expressions of the expected magnetic fields and compare them with fields observed during actual surveys. We also compare these anomalies fields with magnetic fields produced by other long objects, such as submarine pipelines The data processing techniques are discussed. There include the use of Analytic Signal and direct modeling of Total Magnetic Field. The Analytic Signal analysis can be adapted using ground truth where available, but the total field allows better discrimination of the cable parameters, in particular to distinguish between live and idle cable. Use of a Transverse Gradiometer (TVG) allows for easy discrimination between cable and pipe line objects. Considerable magnetic gradient is present in the case of a pipeline whereas there is less gradient for the DC power cable. Thus the TVG is used to validate assumptions made during the data interpretation process. Data obtained during the TVG surveys suggest that the magnetic field of a live HVDC cable is described by an expression for two infinite long wires carrying current in opposite directions.

  20. Crystal River 3 Cable Materials for Thermal and Gamma Radiation Aging

    Energy Technology Data Exchange (ETDEWEB)

    Fifield, Leonard S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Correa, Miguel [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zwoster, Andy [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-09-07

    The Expanded Materials Degradation Assessment Volume 5: Aging of Cables and Cable Systems (EMDA) summarizes the state of knowledge of materials, constructions, operating environments, and aging behavior of low voltage and medium cables in nuclear power plants (NPPs) and identifies potential knowledge gaps with regard to cable operation beyond 60 years. The greatest area of uncertainty relates to how well the accelerated aging used in the original equipment qualification (EQ) processes predicts the performance of cable materials in extended operation. General opinion and utility experience have indicated that actual operating environments of in-plant cables are not as severe, however, as the operating and design basis environments used in the qualification process. Better understanding of the long term aging behavior of cable insulation materials in service conditions and the analysis of actual cable operating environments are the objectives of ongoing research to support subsequent license renewal activities in particular and long term cable aging management in general. A key component of the effort to better understand cable material aging behavior is the availability of representative samples of cables that have been installed in operating light water reactors and have experienced long term service. Unique access to long term service cables, including relatively rich information on cable identity and history, occurred in 2016 through the assistance of the Electric Power Research Institute (EPRI). EPRI facilitated DOE receipt of harvested cables from the decommissioned Crystal River Unit 3 (CR3) pressurized water reactor representing six of the nine most common low voltage cable manufacturers (EPRI 103841R1): Rockbestos, Anaconda Wire and Cable Company (Anaconda), Boston Insulated Wire (BIW), Brand-Rex, Kerite and Okonite. Cable samples received had been installed in the operating plant for durations ranging from 10 years to 36 years. These cables provide the

  1. Rapid optimization of tension distribution for cable-driven parallel manipulators with redundant cables

    Science.gov (United States)

    Ouyang, Bo; Shang, Weiwei

    2016-03-01

    The solution of tension distributions is infinite for cable-driven parallel manipulators(CDPMs) with redundant cables. A rapid optimization method for determining the optimal tension distribution is presented. The new optimization method is primarily based on the geometry properties of a polyhedron and convex analysis. The computational efficiency of the optimization method is improved by the designed projection algorithm, and a fast algorithm is proposed to determine which two of the lines are intersected at the optimal point. Moreover, a method for avoiding the operating point on the lower tension limit is developed. Simulation experiments are implemented on a six degree-of-freedom(6-DOF) CDPM with eight cables, and the results indicate that the new method is one order of magnitude faster than the standard simplex method. The optimal distribution of tension distribution is thus rapidly established on real-time by the proposed method.

  2. Total dose hardening of buried insulator in implanted silicon-on-insulator structures

    International Nuclear Information System (INIS)

    Mao, B.Y.; Chen, C.E.; Pollack, G.; Hughes, H.L.; Davis, G.E.

    1987-01-01

    Total dose characteristics of the buried insulator in implanted silicon-on-insulator (SOI) substrates have been studied using MOS transistors. The threshold voltage shift of the parasitic back channel transistor, which is controlled by charge trapping in the buried insulator, is reduced by lowering the oxygen dose as well as by an additional nitrogen implant, without degrading the front channel transistor characteristics. The improvements in the radiation characteristics of the buried insulator are attributed to the decrease in the buried oxide thickness or to the presence of the interfacial oxynitride layer formed by the oxygen and nitrogen implants

  3. Thin film conductors for self-equalizing cables

    Science.gov (United States)

    Owen, G.; Trutna, W. R.; Orsley, T. J.; Lucia, F.; Daly, C. B.

    2017-10-01

    Self-equalizing cables using hollow conductors with wall thickness less than the skin depth were proposed in 1929. However, they do not appear ever to have been widely used, although the idea has resurfaced and been refined from time to time. In the early 2000's, self-equalizing conductors consisting of solid magnetic steel cores coated with silver were developed by W.L. Gore, and used in their 2.5 Gb/s "Eye-Opener" cables, although higher speed versions never appeared. We have revived the original 1929 idea, proposing to use glass as a solid insulating core. This technology can potentially work at frequencies of many 10's of GHz. Possible uses include short range GHz links such as USB and Thunderbolt, and intra-rack interconnections in data centers. Our feasibility experiments have validated the principle. Copper coated glass fibers can, in principle, be manufactured, but in these tests, the conductors were capillaries internally coated with silver as these are easily obtainable, relatively inexpensive and serve to test the concept. The performance of these experimental twin lead cables corresponds to calculations, confirming the general principle. By calculation, we have compared the performance of cables made from copper-on-insulator conductors to that of similar cables made with solid copper conductors, and verified that copper-on-insulator cables have significantly less frequency dependent loss. We have also made and tested cables with copper on PEEK conductors as surrogates for copper on glass fiber.

  4. Modeling Cable and Guide Channel Interaction in a High-Strength Cable-Driven Continuum Manipulator.

    Science.gov (United States)

    Moses, Matthew S; Murphy, Ryan J; Kutzer, Michael D M; Armand, Mehran

    2015-12-01

    This paper presents several mechanical models of a high-strength cable-driven dexterous manipulator designed for surgical procedures. A stiffness model is presented that distinguishes between contributions from the cables and the backbone. A physics-based model incorporating cable friction is developed and its predictions are compared with experimental data. The data show that under high tension and high curvature, the shape of the manipulator deviates significantly from a circular arc. However, simple parametric models can fit the shape with good accuracy. The motivating application for this study is to develop a model so that shape can be predicted using easily measured quantities such as tension, so that real-time navigation may be performed, especially in minimally-invasive surgical procedures, while reducing the need for hazardous imaging methods such as fluoroscopy.

  5. Debris from cobalt-chrome cable may cause acetabular loosening.

    Science.gov (United States)

    Kelley, S S; Johnston, R C

    1992-12-01

    To address the issue of nonunion with trochanteric osteotomy, surgeons have experimented with various modes of fixation, wire and cable being the two most popular. From a group of 643 primary cemented total hip arthroplasties performed by a single surgeon via the trans-trochanteric approach, minimum four-year roentgenographic follow-up evaluations were performed on 322 hips (50%). The method of fixation was stainless steel monofilament wire in 162 cases and Co-Cr cable in 160. Trochanteric union rates were 75% (122 patients) for the wire group and 79% (126 patients) for the cable. Breakage rates of the entire trochanteric fixation construction (all three wires or cables) were 43% (68 patients) for the wire and 12% (20 patients) for the cable. Unraveled cable was seen in 56% of the hips (90 patients), and in 47% of these hips, there were no broken cables. Blinded roentgenographic analysis of the acetabulum, preformed independently, revealed that loosening of the acetabulum in the cable group was greater than in the wire group. Cables offer no significant benefit over wires and may have potential adverse effects. Generation of significant particulate debris was noted roentgenographically, and marked reaction/destruction was found at the time of revision surgery.

  6. Fault Management of a Cold Dielectric HTS Power Transmission Cable

    International Nuclear Information System (INIS)

    Maguire, J; Allais, A; Yuan, J; Schmidt, F; Hamber, F; Welsh, Tom

    2006-01-01

    High temperature superconductor (HTS) power transmission cables offer significant advantages in power density over conventional copper-based cables. As with conventional cables, HTS cables must be safe and reliable when abnormal conditions, such as local and through faults, occur in the power grid. Due to the unique characteristics of HTS power cables, the fault management of an HTS cable is different from that of a conventional cable. Issues, such as nitrogen bubble formation within lapped dielectric material, need to be addressed. This paper reviews the efforts that have been performed to study the fault conditions of a cold dielectric HTS power cable. As a result of the efforts, a fault management scheme has been developed, which provides both local and through faults system protection. Details of the fault management scheme with examples are presented

  7. Sexual and Overall Quality of Life Improvements After Surgical Correction of "Buried Penis".

    Science.gov (United States)

    Hughes, Duncan B; Perez, Edgar; Garcia, Ryan M; Aragón, Oriana R; Erdmann, Detlev

    2016-05-01

    "Buried penis" is an increasing burden in our population with many possible etiologies. Although surgical correction of buried penis can be rewarding and successful for the surgeon, the psychological and functional impact of buried penis on the patient is less understood. The study's aim was to evaluate the sexual satisfaction and overall quality of life before and after buried penis surgery in a single-surgeon's patient population using a validated questionnaire (Changes in Sexual Functioning Questionnaire short-form). Using Likert scales generated from the questionnaire and 1-tailed paired t test analysis, we found that there was significantly improved sexual function after correction of a buried penis. Variables individually showed that there was significant improvement with sexual pleasure, urinating, and with genital hygiene postoperatively. There were no significant differences concerning frequency of pain with orgasms. Surgical correction of buried penis significantly improves the functional, sexual, and psychological aspects of patient's lives.

  8. Improved practical formulas for estimation of cable tension by vibration method; Shindoho ni yoru cable choryoku jitsuyo santeishiki no hosei

    Energy Technology Data Exchange (ETDEWEB)

    Zui, H. [Setsunan University, Osaka (Japan). Faculty of Engineering; Shinke, T. [Kobe Technical College, Kobe, Kobe (Japan); Hamazaki, Y. [Kobe Steel, Ltd., Kobe (Japan)

    1995-10-21

    The vibration method is usually utilized on the measurement of cable tension during construction of cable bridge such as Nielsen bridges or cable stayed bridges. Practical formula for the vibration method previously proposed by authors is often used where bending rigidity is taken into account. These formula, however, have a certain limit of application and do not yield good results when the cable is not slender or not enough mentioned. The practical formula is modified to improve the accuracy and new formulas are made. The new practical formulas are applicable to any cables, regardless of its length and tension in it. The accuracy is confirmed through comparison of the value obtained by practical formulas with measured values and calculated value by F.E.M. 2 refs., 4 figs., 1 tab.

  9. Markov chain model helps predict pitting corrosion depth and rate in underground pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Caleyo, F.; Velazquez, J.C.; Hallen, J. M. [ESIQIE, Instituto Politecnico Nacional, Mexico D. F. (Mexico); Esquivel-Amezcua, A. [PEMEX PEP Region Sur, Villahermosa, Tabasco (Mexico); Valor, A. [Universidad de la Habana, Vedado, La Habana (Cuba)

    2010-07-01

    Recent reports place pipeline corrosion costs in North America at seven billion dollars per year. Pitting corrosion causes the higher percentage of failures among other corrosion mechanisms. This has motivated multiple modelling studies to be focused on corrosion pitting of underground pipelines. In this study, a continuous-time, non-homogenous pure birth Markov chain serves to model external pitting corrosion in buried pipelines. The analytical solution of Kolmogorov's forward equations for this type of Markov process gives the transition probability function in a discrete space of pit depths. The transition probability function can be completely identified by making a correlation between the stochastic pit depth mean and the deterministic mean obtained experimentally. The model proposed in this study can be applied to pitting corrosion data from repeated in-line pipeline inspections. Case studies presented in this work show how pipeline inspection and maintenance planning can be improved by using the proposed Markovian model for pitting corrosion.

  10. 30 CFR 75.600 - Trailing cables; flame resistance.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables; flame resistance. 75.600 Section 75.600 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE... cables; flame resistance. [Statutory Provisions] Trailing cables used in coal mines shall meet the...

  11. A GIS-based 3D online information system for underground energy storage in northern Germany

    Science.gov (United States)

    Nolde, Michael; Malte, Schwanebeck; Ehsan, Biniyaz; Rainer, Duttmann

    2015-04-01

    We would like to present the concept and current state of development of a GIS-based 3D online information system for underground energy storage. Its aim is to support the local authorities through pre-selection of possible sites for thermal, electrical and substantial underground energy storages. Since the extension of renewable energies has become legal requirement in Germany, the underground storing of superfluously produced green energy (such as during a heavy wind event) in the form of compressed air, gas or heated water has become increasingly important. However, the selection of suitable sites is a complex task. The presented information system uses data of geological features such as rock layers, salt domes and faults enriched with attribute data such as rock porosity and permeability. This information is combined with surface data of the existing energy infrastructure, such as locations of wind and biogas stations, powerline arrangement and cable capacity, and energy distribution stations. Furthermore, legal obligations such as protected areas on the surface and current underground mining permissions are used for the process of pre-selecting sites suitable for energy storage. Not only the current situation but also prospective scenarios, such as expected growth in produced amount of energy are incorporated in the system. While the process of pre-selection itself is completely automated, the user has full control of the weighting of the different factors via the web interface. The system is implemented as an online 3D server GIS environment, so that it can easily be utilized in any web browser. The results are visualized online as interactive 3d graphics. The information system is implemented in the Python programming language in combination with current Web standards, and is build using only free and open source software. It is being developed at Kiel University as part of the ANGUS+ project (lead by Prof. Sebastian Bauer) for the federal state of

  12. Design of buried concrete encasements

    International Nuclear Information System (INIS)

    Drake, R.M.

    1989-01-01

    The operation of many Department of Energy (DOE) sites requires the transfer of radioactive liquid products from one location to another. DOE Order 6430.1A requires that the transfer pipelines be designed and constructed so that any leakage can be detected and contained before it reaches the environment. One design option often considered to meet this requirement is to place the pipeline in a stainless steel-lined, buried concrete encasement. This provides the engineer with the design challenge to integrate standard structural design principles with unique DOE requirements. The complete design of a buried concrete encasement must consider seismic effects, leak detection, leak confinement, radiation shielding, thermal effects, pipe supports, and constructability. This paper contains a brief discussion of each of these design considerations, based on experience gained during the design of concrete encasements for the Process Facilities Modifications (PFM) project at Hanford

  13. Dynamic characteristics of stay cables with inerter dampers

    Science.gov (United States)

    Shi, Xiang; Zhu, Songye

    2018-06-01

    This study systematically investigates the dynamic characteristics of a stay cable with an inerter damper installed close to one end of a cable. The interest in applying inerter dampers to stay cables is partially inspired by the superior damping performance of negative stiffness dampers in the same application. A comprehensive parametric study on two major parameters, namely, inertance and damping coefficients, are conducted using analytical and numerical approaches. An inerter damper can be optimized for one vibration mode of a stay cable by generating identical wave numbers in two adjacent modes. An optimal design approach is proposed for inerter dampers installed on stay cables. The corresponding optimal inertance and damping coefficients are summarized for different damper locations and interested modes. Inerter dampers can offer better damping performance than conventional viscous dampers for the target mode of a stay cable that requires optimization. However, additional damping ratios in other vibration modes through inerter damper are relatively limited.

  14. Buried waste integrated demonstration FY 94 deployment plan

    International Nuclear Information System (INIS)

    Hyde, R.A.; Walker, S.; Garcia, M.M.

    1994-05-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The fiscal year (FY) 1994 effort will fund thirty-eight technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. This document is the basic operational planning document for deployment of all BWID projects. Discussed in this document are the BWID preparations for INEL field demonstrations, INEL laboratory demonstrations, non-INEL demonstrations, and paper studies. Each technology performing tests will prepare a test plan to detail the specific procedures, objectives, and tasks of each test. Therefore, information specific to testing each technology is intentionally omitted from this document

  15. Development of innovative superconducting DC power cable

    Energy Technology Data Exchange (ETDEWEB)

    Matsushita, Teruo; Kiuchi, Masaru [Dept. of Computer Science and Electronics Kyushu Institute of Technology, Iizuka (Japan)

    2017-09-15

    It is required to reduce the cost of superconducting cable to realize a superconducting DC power network that covers a wide area in order to utilize renewable energy. In this paper a new concept of innovative cable is introduced that can enhance the current-carrying capacity even though the same superconducting tape is used. Such a cable can be realized by designing an optimal winding structure in such a way that the angle between the tape and magnetic field becomes small. This idea was confirmed by preliminary experiments for a single layer model cable made of Bi-2223 tapes and REBCO coated conductors. Experiments of three and four layer cables of practical sizes were also done and it was found that the current-carrying capacity increased as theoretically predicted. If the critical current properties of commercial superconducting tapes are further improved in a parallel magnetic field, the enhancement will become pronounced and this technology will surely contribute to realization of superconducting DC power network.

  16. Test plan for buried waste containment system materials

    International Nuclear Information System (INIS)

    Weidner, J.; Shaw, P.

    1997-03-01

    The objectives of the FY 1997 barrier material work at the Idaho National Engineering and Environmental Laboratory are to (1) select a waste barrier material and verify that it is compatible with the Buried Waste Containment System Process, and (2) determine if, and how, the Buried Waste Containment System emplacement process affects the material properties and performance (on proof of principle scale). This test plan describes a set of measurements and procedures used to validate a waste barrier material for the Buried Waste Containment System. A latex modified proprietary cement manufactured by CTS Cement Manufacturing Company will be tested. Emplacement properties required for the Buried Waste Containment System process are: slump between 8 and 10 in., set time between 15 and 30 minutes, compressive strength at set of 20 psi minimum, and set temperature less than 100 degrees C. Durability properties include resistance to degradation from carbonate, sulfate, and waste-site soil leachates. A set of baseline barrier material properties will be determined to provide a data base for comparison with the barrier materials when tested in the field. The measurements include permeability, petrographic analysis to determine separation and/or segregation of mix components, and a set of mechanical properties. The measurements will be repeated on specimens from the field test material. The data will be used to determine if the Buried Waste Containment System equipment changes the material. The emplacement properties will be determined using standard laboratory procedures and instruments. Durability of the barrier material will be evaluated by determining the effect of carbonate, sulfate, and waste-site soil leachates on the compressive strength of the barrier material. The baseline properties will be determined using standard ASTM procedures. 9 refs., 1 fig., 2 tabs

  17. Underground risk management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Matsuyama, S.; Inoue, M.; Sakai, T.

    2006-03-15

    JCOAL has conducted Joint Research on an Underground Communication and Risk Management Information System with CSIRO of Australia under a commissioned study project for the promotion of coal use starting in fiscal 2002. The goal of this research project is the establishment of a new Safety System focusing on the comprehensive risk management information system by the name of Nexsys. The main components of the system are the Ethernet type underground communication system that represents the data communication base, and the risk management information system that permits risk analysis in real-time and provides decision support based on the collected data. The Nexsys is an open system and is a core element of the underground monitoring system. Using a vast amount of underground data, it is capable of accommodating a wide range of functions that were not available in the past. Because of it, it is possible to construct an advanced underground safety system. 14 figs., 4 tabs.

  18. 2nd International Conference on Cable-Driven Parallel Robots

    CERN Document Server

    Bruckmann, Tobias

    2015-01-01

    This volume presents the outcome of the second forum to cable-driven parallel robots, bringing the cable robot community together. It shows the new ideas of the active researchers developing cable-driven robots. The book presents the state of the art, including both summarizing contributions as well as latest research and future options. The book cover all topics which are essential for cable-driven robots: Classification Kinematics, Workspace and Singularity Analysis Statics and Dynamics Cable Modeling Control and Calibration Design Methodology Hardware Development Experimental Evaluation Prototypes, Application Reports and new Application concepts

  19. Fiscal 1997 report on the results of the international standardization R and D. Development of a test method of halogen-free flame-retardant cables and a study of the cable standards; 1997 nendo seika hokokusho kokusai hyojun soseigata kenkyu kaihatsu. Non halogen nannen cable no shiken hoho kaihatsu narabini cable kikaku no kento

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    As for halogen-free flame-retardant cables with high recyclability and safety (HFFR cables), the development is being promoted in many countries as a next generation cable. The standard of HFFR cables has been set up by some countries and groups in the U.S. and Europe, but the international standard has not yet been established independently. The purpose of this R and D is the development of a test method to appropriately evaluate the performance of HFFR cables and its standardization, and the proposal of the international standardization on common items of the cable standard. A study group was sent to the U.S. and Europe to investigate the development, application status and test methods of the HFFR cable overseas. The ion chromatography and FT-IR method were studied as methods to evaluate corrosivity/toxicity of the gases emitted in combustion. The performance of HFFR cables in Japan and abroad was also evaluated mainly by IEC standards. Further, considering the results of the overseas surveys, the structure and details of the international standard plan on HFFR cables were studied, and approaches to the international standardization were studied. 32 refs., 31 figs., 54 tabs.

  20. Application of super workable concrete to main tower of cable-stayed prestressed concrete bridge. ; Kiba park grand bridge. PC shachokyo no shuto eno tekiyo. ; Kiba koen ohashi

    Energy Technology Data Exchange (ETDEWEB)

    Matsuoka, Y.; Shindo, T.; Sakamoto, A. (Taisei Corp., Tokyo (Japan))

    1993-08-01

    The Kiba Park Grand Bridge is a cable-stayed prestressed concrete (PC) bridge with a length of 186m. The main tower of this PC cable-stayed bridge consists of a pair of vertical columns with height of 60m and a beam connecting the columns. For the purpose of the advanced efficiency of construction without formwork and removal work and the improvement of durability, the precast buried formwork made of polymer impregnated concrete formwork was adopted. Approximate 650 cubic meter of super workable concrete was placed for the upper part ranging from 7th to 17th blocks of vertical columns and the beam. Blast furnace cement B and fly ash were used as binder. Naphthalenesulfonic acid type high performance water reducing agent and lignosulfonic acid type AE (air-entraining) water reducing agent were used as admixtures. Super workable concrete was mixed using forced double-axle mixers in the ready-mixed concrete plant. Satisfactory quality of the fresh concrete and strength of the hardened concrete were obtained. 2 refs., 11 figs., 3 tabs.

  1. Stationary operational behavior unsymmetrical superconducting three-phase cable

    Energy Technology Data Exchange (ETDEWEB)

    Iser, R.

    1974-01-01

    A superconducting cable with a coaxial conductor arrangement is electrically unsymmetrical. Voltage and current relationships are analyzed for such a cable where, as a result of reactance and capacitance matrices being unsymmetric, large voltage unsymmetry appears. This limits the practical length of this type of cable. It is shown that a significant gain in symmetry is attained by the use of two cables connected in parallel. The compensating current which then occurs involves no disadvantage. The circuit described permits overloads of up to 100 percent.

  2. Influence of Icing on Bridge Cable Aerodynamics

    DEFF Research Database (Denmark)

    Koss, Holger; Frej Henningsen, Jesper; Olsen, Idar

    2013-01-01

    In recent years the relevance of ice accretion for wind-induced vibration of structural bridge cables has been recognised and became a subject of research in bridge engineering. Full-scale monitoring and observation indicate that light precipitation at moderate low temperatures between zero and -5......°C may lead to large amplitude vibrations of bridge cables under wind action. For the prediction of aerodynamic instability quasi-steady models have been developed estimating the cable response magnitude based on structural properties and aerodynamic force coefficients for drag, lift and torsion...... forces of different bridge cables types. The experiments were conducted in a wind tunnel facility capable amongst others to simulate incloud icing conditions....

  3. Rotator cuff tendon connections with the rotator cable.

    Science.gov (United States)

    Rahu, Madis; Kolts, Ivo; Põldoja, Elle; Kask, Kristo

    2017-07-01

    The literature currently contains no descriptions of the rotator cuff tendons, which also describes in relation to the presence and characteristics of the rotator cable (anatomically known as the ligamentum semicirculare humeri). The aim of the current study was to elucidate the detailed anatomy of the rotator cuff tendons in association with the rotator cable. Anatomic dissection was performed on 21 fresh-frozen shoulder specimens with an average age of 68 years. The rotator cuff tendons were dissected from each other and from the glenohumeral joint capsule, and the superior glenohumeral, coracohumeral, coracoglenoidal and semicircular (rotator cable) ligaments were dissected. Dissection was performed layer by layer and from the bursal side to the joint. All ligaments and tendons were dissected in fine detail. The rotator cable was found in all specimens. It was tightly connected to the supraspinatus (SSP) tendon, which was partly covered by the infraspinatus (ISP) tendon. The posterior insertion area of the rotator cable was located in the region between the middle and inferior facets of the greater tubercle of the humerus insertion areas for the teres minor (TM), and ISP tendons were also present and fibres from the SSP extended through the rotator cable to those areas. The connection between the rotator cable and rotator cuff tendons is tight and confirms the suspension bridge theory for rotator cuff tears in most areas between the SSP tendons and rotator cable. In its posterior insertion area, the rotator cable is a connecting structure between the TM, ISP and SSP tendons. These findings might explain why some patients with relatively large rotator cuff tears can maintain seamless shoulder function.

  4. Automated wireless monitoring system for cable tension using smart sensors

    Science.gov (United States)

    Sim, Sung-Han; Li, Jian; Jo, Hongki; Park, Jongwoong; Cho, Soojin; Spencer, Billie F.; Yun, Chung-Bang

    2013-04-01

    Cables are critical load carrying members of cable-stayed bridges; monitoring tension forces of the cables provides valuable information for SHM of the cable-stayed bridges. Monitoring systems for the cable tension can be efficiently realized using wireless smart sensors in conjunction with vibration-based cable tension estimation approaches. This study develops an automated cable tension monitoring system using MEMSIC's Imote2 smart sensors. An embedded data processing strategy is implemented on the Imote2-based wireless sensor network to calculate cable tensions using a vibration-based method, significantly reducing the wireless data transmission and associated power consumption. The autonomous operation of the monitoring system is achieved by AutoMonitor, a high-level coordinator application provided by the Illinois SHM Project Services Toolsuite. The monitoring system also features power harvesting enabled by solar panels attached to each sensor node and AutoMonitor for charging control. The proposed wireless system has been deployed on the Jindo Bridge, a cable-stayed bridge located in South Korea. Tension forces are autonomously monitored for 12 cables in the east, land side of the bridge, proving the validity and potential of the presented tension monitoring system for real-world applications.

  5. Buried injector logic, a vertical IIL using deep ion implantation

    NARCIS (Netherlands)

    Mouthaan, A.J.

    1987-01-01

    A vertically integrated alternative for integrated injection logic has been realized, named buried injector logic (BIL). 1 MeV ion implantations are used to create buried layers. The vertical pnp and npn transistors have thin base regions and exhibit a limited charge accumulation if a gate is

  6. Solid-cryogen-stabilized, cable-in-conduit (CIC) superconducting cables

    Science.gov (United States)

    Voccio, J. P.; Michael, P. C.; Bromberg, L.; Hahn, S.

    2015-12-01

    This paper considers the use of a solid cryogen as a means to stabilize, both mechanically and thermally, magnesium diboride (MgB2) superconducting strands within a dual-channel cable-in-conduit (CIC) cable for use in AC applications, such as a generator stator winding. The cable consists of two separate channels; the outer channel contains the superconducting strands and is filled with a fluid (liquid or gas) that becomes solid at the device operating temperature. Several options for fluid will be presented, such as liquid nitrogen, hydrocarbons and other chlorofluorocarbons (CFCs) that have a range of melting temperatures and volumetric expansions (from solid at operating temperature to fixed volume at room temperature). Implications for quench protection and conductor stability, enhanced through direct contact with the solid cryogen, which has high heat capacity and thermal conductivity (compared with helium gas), will be presented. Depending on the cryogen, the conductor will be filled initially either with liquid at atmospheric conditions or a gas at high pressure (∼100 atm). After cooldown, the cryogen in the stranded-channel will be solid, essentially locking the strands in place, preventing strand motion and degradation due to mechanical deformation while providing enhanced thermal capacity for stability and protection. The effect of cryogen porosity is also considered. The relatively high heat capacity of solid cryogens at these lower temperatures (compared to gaseous helium) enhances the thermal stability of the winding. During operation, coolant flow through the open inner channel will minimize pressure drop.

  7. Analysis of the Working Cable System of Single-span Circulating Ropeway

    Directory of Open Access Journals (Sweden)

    Qin Jian

    2017-01-01

    Full Text Available Based on the analysis of the mutual interaction between bearing cable and traction cable of single-span circulating ropeway, the calculation method is proposed for working cables of ropeway with arbitrary loads. The 5 sets nonlinear equations are set up for the working cables according to the equal spans and altitude differences of the bearing cable and the traction cable, the constant of the load running space and the bearing cable length, and the tension balance of bearing cable and traction cable beside load. The resolving method is proposed based on the Newton iterative method. The correctness and feasibility of the method are proved by the results of engineering test. From the solution, the tension and coordinate of working cables can be obtained accurately, which is meaningful for the design and analysis of the freight ropeway.

  8. Risk and cost tradeoffs for remote retrieval of buried waste

    International Nuclear Information System (INIS)

    Hyde, R.A.; Grienbenow, B.E.; Nickelson, D.F.

    1994-01-01

    The Buried Waste Integrated Demonstration is supporting the development, demonstration, testing, and evaluation of a suite of technologies that, when integrated with commercially available technologies, form a comprehensive system for the remediation of radioactive and hazardous buried waste. As a part of the program's technology development, remote retrieval equipment is being developed and tested for the remediation of buried waste. During remedial planning, several factors are considered when choosing remote versus manual retrieval systems. Time that workers are exposed to radioactivity, chemicals, air particulate, and industrial hazards is one consideration. The generation of secondary waste is also a consideration because it amounts to more waste to treat and some wastes may require special handling or treatment. Cost is also a big factor in determining whether remote or manual operations will be used. Other considerations include implementability, effectiveness, and the number of required personnel. This paper investigates each of these areas to show the risk and cost benefits and limitations for remote versus manual retrieval of buried waste

  9. Long-term monitoring FBG-based cable load sensor

    Science.gov (United States)

    Zhang, Zhichun; Zhou, Zhi; Wang, Chuan; Ou, Jinping

    2006-03-01

    Stay cables are the main load-bearing components of stayed-cable bridges. The cables stress status is an important factor to the stayed-cable bridge structure safety evaluation. So it's very important not only to the bridge construction, but also to the long-term safety evaluation for the bridge structure in-service. The accurate measurement for cable load depends on an effective sensor, especially to meet the long time durability and measurement demand. FBG, for its great advantage of corrosion resistance, absolute measurement, high accuracy, electro-magnetic resistance, quasi-distribution sensing, absolute measurement and so on, is the most promising sensor, which can cater for the cable force monitoring. In this paper, a load sensor has been developed, which is made up of a bushing elastic supporting body, 4 FBGs uniformly-spaced attached outside of the bushing supporting body, and a temperature compensation FBG for other four FBGs, moreover a cover for protection of FBGs. Firstly, the sensor measuring principle is analyzed, and relationship equation of FBG wavelength shifts and extrinsic load has also been gotten. And then the sensor calibration experiments of a steel cable stretching test with the FBG load sensor and a reference electric pressure sensor is finished, and the results shows excellent linearity of extrinsic load and FBG wavelength shifts, and good repeatability, which indicates that such kind of FBG-based load sensor is suitable for load measurement, especially for long-term, real time monitoring of stay-cables.

  10. Heat resistant wire and cable and heat shrinkable tubes

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, Keiji [Sumitomo Electric Industries Ltd. (Japan)

    1994-12-31

    Radiation processes have been used in industrial fields (e.g. wire and cable, heat shrinkable tubes) for about 30 years. In Japan, 60 electron beam accelerators were used in R and D, 54 in wire and cable, 24 in tire rubber, 16 in paint curing, 14 in PE foam and 9 accelerators were used in heat shrinkable tubes in 1993. Many properties (e.g. solder resistance, thermal deformation, and solven resistance) of wire and cable are improved by using radiation processes, and many kinds of radiation crosslinked wire and cable are used in the consumer market (TV sets, VTR`s, audio disc players, etc.), automobiles (automobile wire harnesses, fusible link wires, sensor cables etc.), and the industrial market (computer cables, cables for keyboards, coaxial cables, etc.). Another important industrial application of E{beta} radiation process is heat shrinkable tubes. Heat shinkable tubes, heated by a hot gun, shrink 1/2 {approx} 1/3 of their inner diameters. Heat shrinkable tubes are used for covers of distributing line terminals, joint covers of telecommunication lines, protection of fuel pipe lines and so on. In this seminar, actual applications and characteristic properties of radiation crosslinked materials are presented.

  11. Heat resistant wire and cable and heat shrinkable tubes

    International Nuclear Information System (INIS)

    Keiji Ueno

    1994-01-01

    Radiation processes have been used in industrial fields (e.g. wire and cable, heat shrinkable tubes) for about 30 years. In Japan, 60 electron beam accelerators were used in R and D, 54 in wire and cable, 24 in tire rubber, 16 in paint curing, 14 in PE foam and 9 accelerators were used in heat shrinkable tubes in 1993. Many properties (e.g. solder resistance, thermal deformation, and solven resistance) of wire and cable are improved by using radiation processes, and many kinds of radiation crosslinked wire and cable are used in the consumer market (TV sets, VTR's, audio disc players, etc.), automobiles (automobile wire harnesses, fusible link wires, sensor cables etc.), and the industrial market (computer cables, cables for keyboards, coaxial cables, etc.). Another important industrial application of Eβ radiation process is heat shrinkable tubes. Heat shinkable tubes, heated by a hot gun, shrink 1/2 ∼ 1/3 of their inner diameters. Heat shrinkable tubes are used for covers of distributing line terminals, joint covers of telecommunication lines, protection of fuel pipe lines and so on. In this seminar, actual applications and characteristic properties of radiation crosslinked materials are presented

  12. Analysis of Harmonic Vibration of Cable-Stayed Footbridge under the Influence of Changes of the Cables Tension

    Directory of Open Access Journals (Sweden)

    Pakos Wojciech

    2015-09-01

    Full Text Available The paper presents numerical analysis of harmonically excited vibration of a cable-stayed footbridge caused by a load function simulating crouching (squats while changing the static tension in chosen cables. The intentional synchronized motion (e.g., squats of a single person or group of persons on the footbridge with a frequency close to the natural frequency of the structure may lead to the resonant vibrations with large amplitudes. The appropriate tension changes in some cables cause detuning of resonance on account of stiffness changes of structures and hence detuning in the natural frequency that is close to the excitation frequency. The research was carried out on a 3D computer model of a real structure - a cable-stayed steel footbridge in Leśnica, a quarter of Wrocław, Poland, with the help of standard computer software based on FEM COSMOS/M System.

  13. Analysis of Harmonic Vibration of Cable-Stayed Footbridge under the Influence of Changes of the Cables Tension

    Science.gov (United States)

    Pakos, Wojciech

    2015-09-01

    The paper presents numerical analysis of harmonically excited vibration of a cable-stayed footbridge caused by a load function simulating crouching (squats) while changing the static tension in chosen cables. The intentional synchronized motion (e.g., squats) of a single person or group of persons on the footbridge with a frequency close to the natural frequency of the structure may lead to the resonant vibrations with large amplitudes. The appropriate tension changes in some cables cause detuning of resonance on account of stiffness changes of structures and hence detuning in the natural frequency that is close to the excitation frequency. The research was carried out on a 3D computer model of a real structure - a cable-stayed steel footbridge in Leśnica, a quarter of Wrocław, Poland, with the help of standard computer software based on FEM COSMOS/M System.

  14. Thin film conductors for self-equalizing cables

    Directory of Open Access Journals (Sweden)

    G. Owen

    2017-10-01

    Full Text Available Self-equalizing cables using hollow conductors with wall thickness less than the skin depth were proposed in 1929. However, they do not appear ever to have been widely used, although the idea has resurfaced and been refined from time to time. In the early 2000’s, self-equalizing conductors consisting of solid magnetic steel cores coated with silver were developed by W.L. Gore, and used in their 2.5 Gb/s “Eye-Opener” cables, although higher speed versions never appeared. We have revived the original 1929 idea, proposing to use glass as a solid insulating core. This technology can potentially work at frequencies of many 10’s of GHz. Possible uses include short range GHz links such as USB and Thunderbolt, and intra-rack interconnections in data centers. Our feasibility experiments have validated the principle. Copper coated glass fibers can, in principle, be manufactured, but in these tests, the conductors were capillaries internally coated with silver as these are easily obtainable, relatively inexpensive and serve to test the concept. The performance of these experimental twin lead cables corresponds to calculations, confirming the general principle. By calculation, we have compared the performance of cables made from copper-on-insulator conductors to that of similar cables made with solid copper conductors, and verified that copper-on-insulator cables have significantly less frequency dependent loss. We have also made and tested cables with copper on PEEK conductors as surrogates for copper on glass fiber.

  15. Fabrication of Nb3Sn cables for ITER toroidal field coils

    International Nuclear Information System (INIS)

    Isono, Takaaki; Tsutsumi, Fumiaki; Nunoya, Yoshihiko; Matsui, Kunihiro; Takahashi, Yoshikazu; Nakajima, Hideo; Ishibashi, Tatsuji; Sato, Go; Chida, Kenji; Suzuki, Rikio; Tanji, Tsutomu

    2012-01-01

    Cable-in-conduit conductors for ITER toroidal field (TF) coils will be operated at 68 kA and 11.8 T. The cable is composed of 1,422 strands with a diameter of 0.82 mm. There were two options for initial procurement. For option 2, the twist pitches at lower stages are longer than in option 1. Trials were performed to assess the feasibility of these options. In the trials for option 1, the nominal outer diameter of sub-cables and reduction schedule of final cables were evaluated and finalized. In the trials for option 2, problems were encountered at the third stage cabling. These problems were resolved through increasing the die size in that stage and improving the tension balance of the second-stage cables to reduce friction between the die and the cable, and also through avoiding loose twisting at both edges of the third cables. Option 2 was finally selected in 2009 based on superconducting performance enhancement of the cable. After the qualification of the fabrication procedure using fabrication of a 760-m dummy cable and a 415-m superconducting cable, mass production of the cables started in March 2010. (author)

  16. Semiannual report for the period October 1, 1979-March 31, 1980 of work on: (1) superconducting power transmission system development; (2) cable insulation development. Power Transmission Project Technical Note No. 106

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-07

    Progress is reported in a program whose objective is to develop an underground superconducting power transmission system which is economical and technically attractive to the utility industry. The system would be capable of carrying very large blocks of electric power, and would supplant overhead lines in urban and suburban areas and regions of natural beauty. The program consisted initially of work in the laboratory to develop suitable materials, cryostats, and cable concepts. The materials work covers the development and testing of suitable superconductors and dielectric insulation. The laboratory work has now been extended to an outside test facility which represents an intermediate step between the laboratory scale and a full-scale system. The facility will allow cables several hundred feet long to be tested under realistic conditions. In addition, the refrigerator has been designed for optimum service for utility applications.

  17. 46 CFR 111.60-6 - Fiber optic cable.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Fiber optic cable. 111.60-6 Section 111.60-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-6 Fiber optic cable. Each fiber optic cable must— (a) Be...

  18. Comparison of programmed and cabled re-entrance systems. Elaboration of cabled re-entrance system for a CII 90.40

    International Nuclear Information System (INIS)

    Perraudeau, Jean

    1976-01-01

    The objective of this research thesis is to study problems related to re-entrance, and, more particularly, to study a re-entrance system for a CII 90.40 computer. Such a system can be realised under a programmed or cabled form, and both approaches are described and compared. A generalisation of this comparison is briefly proposed. As the computer already possesses a programmed re-entrance system, the author focuses on the study of the cabled re-entrance system which results in an improvement of performance and possibilities provided by this computer, particularly for its use in real time. The design, realisation and development of such a cabled system are reported. A first part reports a theoretical study on re-entrance (definition, problems, applications), a presentation of the computer, a description of the programmed re-entrance system, a presentation of the principle of the chosen cabled re-entrance system, a definition of the structure and operating mode of the cabled pile and a description of its various components, and a flowchart analysis of function execution. The second part reports the practical realisation: definition, technological overview, technology used in the cabled pile, sequencing and multiplexing principle, impulse transmission, logical layouts, and circuit adjustments. The third part presents practical example. An assessment and perspectives are finally discussed

  19. Preliminary studies of tunnel interface response modeling using test data from underground storage facilities.

    Energy Technology Data Exchange (ETDEWEB)

    Sobolik, Steven Ronald; Bartel, Lewis Clark

    2010-11-01

    In attempting to detect and map out underground facilities, whether they be large-scale hardened deeply-buried targets (HDBT's) or small-scale tunnels for clandestine border or perimeter crossing, seismic imaging using reflections from the tunnel interface has been seen as one of the better ways to both detect and delineate tunnels from the surface. The large seismic impedance contrast at the tunnel/rock boundary should provide a strong, distinguishable seismic response, but in practice, such strong indicators are often lacking. One explanation for the lack of a good seismic reflection at such a strong contrast boundary is that the damage caused by the tunneling itself creates a zone of altered seismic properties that significantly changes the nature of this boundary. This report examines existing geomechanical data that define the extent of an excavation damage zone around underground tunnels, and the potential impact on rock properties such as P-wave and S-wave velocities. The data presented from this report are associated with sites used for the development of underground repositories for the disposal of radioactive waste; these sites have been excavated in volcanic tuff (Yucca Mountain) and granite (HRL in Sweden, URL in Canada). Using the data from Yucca Mountain, a numerical simulation effort was undertaken to evaluate the effects of the damage zone on seismic responses. Calculations were performed using the parallelized version of the time-domain finitedifference seismic wave propagation code developed in the Geophysics Department at Sandia National Laboratories. From these numerical simulations, the damage zone does not have a significant effect upon the tunnel response, either for a purely elastic case or an anelastic case. However, what was discovered is that the largest responses are not true reflections, but rather reradiated Stoneley waves generated as the air/earth interface of the tunnel. Because of this, data processed in the usual way may not

  20. Buried Waste Integrated Demonstration FY-93 Deployment Plan

    International Nuclear Information System (INIS)

    Bonnenberg, R.W.; Heard, R.E.; Milam, L.M.; Watson, L.R.

    1993-02-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the US Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The fiscal year 1993 effort will deploy seven major field demonstrations at the Idaho National Engineering Laboratory's (INEL's) Radioactive Waste Management Complex Cold Test Pit. These major demonstrations are Remote Characterization System, Remote Excavation System, Overburden Removal, Waste Isolation, Contamination Control Unit, Rapid Monitoring Unit, and Fixation of Soil Surface Contamination. This document is the basic operational planning document for BWID deployment of the INEL field demonstrations. Additional sections deal briefly with four nonINEL field and laboratory demonstrations (Buried Waste Retrieval, Arc Melter Vitrification, Graphite DC Plasma Arc Melter, and Fixed Hearth Plasma Process) and with four INEL laboratory demonstrations (Electrostatic Curtain, Thermal Kinetics, Multiaxis Crane Control System, and Dig-Face Characterization)

  1. Intermodal resonance of vibrating suspended cables

    NARCIS (Netherlands)

    Rienstra, S.W.

    2010-01-01

    The weakly nonlinear free vibrations of a single suspended cable, or a coupled system of suspended cables, may be classified as gravity modes (no tension variations to leading order) and elasto-gravity modes (tension and vertical displacement equally important). It was found earlier [12] that the

  2. Behaviour of French electrical cables under fire conditions

    Energy Technology Data Exchange (ETDEWEB)

    Bertrand, R.; Chaussard, M.; Gonzalez, R.; Lacoue, J.; Mattei, J.M.; Such, J.M

    2001-12-01

    A fire Probabilistic Safety Assessment - called fire PSA - is being carried out by the French Institute of Nuclear Safety and Protection (IPSN) to be used in the framework of the safety assessment of operating 900 MWe PWRs. The aim of this study is to evaluate the core damage conditional probability which could result from a fire. A fire can induce unavailability of safety equipment notably damaging electrical cables that are a significant risk contributor. The purpose of this communication is to present the electrical cable fire tests carried out by IPSN to identify the failure modes and to determine the cable damage criteria. Moreover, are indicated the impact of each kind of cable failure mode and the methodology used to estimate the conditional probability of a failure mode when cable damage occurred. (authors)

  3. Young's moduli of cables for high field superconductive dipole magnet

    International Nuclear Information System (INIS)

    Yamada, Shunji; Shintomi, Takakazu.

    1983-01-01

    Superconductive dipole magnets for big accelerators are subjected to enormous electro-magnetic force, when they are operated with high field such as 10 Tesla. They should be constructed by means of superconductive cables, which have high Young's modulus, to obtain good performance. To develop such cables we measured the Young's moduli of cables for practical use of accelerator magnets. They are monolithic and compacted strand cables. We measured also Young's moduli of monolithic copper and brass cables for comparison. The obtained data showed the Young's moduli of 35 and 15 GPa for the monolithic and compacted strand cables, respectively. (author)

  4. Leaky coaxial cable signal transmission for remote facilities

    Science.gov (United States)

    Smith, S. F.; Crutcher, R. I.

    To develop reliable communications methods to meet the rigorous requirements for nuclear hot cells and similar environments, including control of cranes, transporters, and advanced servomanipulators, the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) has conducted extensive tests of numerous technologies to determine their applicability to remote operations. To alleviate the need for large bundles of cables that must accommodate crane/transporter motion relative to the boundaries of the cell, several transmission techniques are available, including slotted-line radio-frequency couplers, infrared beams, fiber-optic cables, free-space microwave, and inductively coupled leaky coaxial cable. This paper discusses the general characteristics, mode of operation, and proposed implementation of leaky coaxial cable technology in a waste-handling facility scheduled to be built in the near future at ORNL. In addition, specific system hardware based around the use of leaky coaxial cable is described in detail. Finally, data from a series of radiation exposure tests conducted by the CFRP on several samples of the basic leaky coaxial cable and associated connectors are presented.

  5. Device for guiding various diameter size cable

    Energy Technology Data Exchange (ETDEWEB)

    Litvinov, I.M.; Klauzer, L.P.; Yeganov, L.I.; Zaripov, A.M.

    1982-01-30

    A design is submitted for a device to guide cable of various diameters. This device consists of a profiled multiple-pass roller, and clamps for uniting cut cable. This design is simplified by allowing both the rollers and their supports to rotate on the roller axis thus facilitating interaction with the clamps. The working surface of the supports is evolute while the outside surfaces have screw-channels for transfering the cable from one roller pass to the other.

  6. Buried waste remediation: A new application for in situ vitrification

    International Nuclear Information System (INIS)

    Kindle, C.H.; Thompson, L.E.

    1991-04-01

    Buried wastes represent a significant environmental concern and a major financial and technological challenge facing many private firms, local and state governments, and federal agencies. Numerous radioactive and hazardous mixed buried waste sites managed by the US Department of Energy (DOE) require timely clean up to comply with state or federal environmental regulations. Hazardous wastes, biomedical wastes, and common household wastes disposed at many municipal landfills represent a significant environmental health concern. New programs and regulations that result in a greater reduction of waste via recycling and stricter controls regarding generation and disposal of many wastes will help to stem the environmental consequences of wastes currently being generated. Groundwater contamination, methane generation, and potential exposures to biohazards and chemically hazardous materials from inadvertent intrusion will continue to be potential environmental health consequences until effective and permanent closure is achieved. In situ vitrification (ISV) is being considered by the DOE as a permanent closure option for radioactive buried waste sites. The results of several ISV tests on simulated and actual buried wastes conducted during 1990 are presented here. The test results illustrate the feasibility of the ISV process for permanent remediation and closure of buried waste sites in commercial landfills. The tests were successful in immobilizing or destroying hazardous and radioactive contaminants while providing up to 75 vol % waste reduction. 6 refs., 7 figs., 5 tabs

  7. Power plant cable condition monitoring and testing at Georgia Power

    International Nuclear Information System (INIS)

    Champion, T.C.

    1988-01-01

    Georgia Power's Research Center has been heavily involved in the evaluation of electrical insulating materials and cables since its inception more than 17 years ago. For the past ten years that expertise has been applied to cables used in generation plants. This paper discusses the results of two test programs. The first is a quality control inspection on 169 samples of new power generation cables. The second is a material degradation evaluation on four short cable samples removed from a coal fired plant during an equipment upgrade. The new material evaluation was performed to identify the cause of a high failure rate upon initial hi-pot testing of newly installed cables. The material degradation evaluation was performed to evaluate the need for replacement of existing cables during an equipment upgrade. Results of the evaluations have led to development of a detailed proposal for a program to evaluate cable degradation and remaining life for cables used in power generation facilities

  8. Configuration of an inelastic flexible anchored cable

    Directory of Open Access Journals (Sweden)

    T. P. Dreyer

    1992-07-01

    Full Text Available Consider an inelastic, perfectly flexible cable with given external forces acting on the total length of the cable. The one end-point is fixed in the origin and the other end-point is anchored at a given point (a;b;c in space. The resulting configuration of the cable in space can be modelled by a system of non-linear differential equations. In this article it is shown that this continuous model of the cable can always be solved in terms of an integral. In the special case of a constant (i.e. independent of the position on the cable external force per unit length the solution is given explicitly in terms of three constants that describe the tension at the origin. These three constants are determined by the boundary values a, b and c at the other end-point, and must be calculated in general by a numerical procedure from the three resulting simultaneous non-linear equations. A few applications of this method are shown.

  9. Buried Waste Integrated Demonstration stakeholder involvement model

    International Nuclear Information System (INIS)

    Kaupanger, R.M.; Kostelnik, K.M.; Milam, L.M.

    1994-04-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the US Department of Energy (DOE) Office of Technology Development. BWID supports the applied research, development, demonstration, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. Stakeholder participation in the DOE Environmental Management decision-making process is critical to remediation efforts. Appropriate mechanisms for communication with the public, private sector, regulators, elected officials, and others are being aggressively pursued by BWID to permit informed participation. This document summarizes public outreach efforts during FY-93 and presents a strategy for expanded stakeholder involvement during FY-94

  10. Buried Landmines in Libya and Detection Technologies

    International Nuclear Information System (INIS)

    El-Bakkoush, F.A.

    2015-01-01

    In this Article, presentation and discussion of the impact of detonated buried land mines in vast areas of land in Libya are given, especially from economical and social point of view. The methods and techniques which are currently used to allocate the positions of buried land mines during de mining operations are mentioned and discussed with emphasize on their strength and weakness. These include mechanical removing methods, prodders, metal detectors, ground penetrating radar and sniffing dogs. Furthermore, the novel and most developed detection techniques invented to detect land mines using SQUDS and neutron techniques based on thermal neutron backscattering and elemental analysis by fast and thermal neutrons are given and discussed.

  11. Development of halogen-free cables for nuclear power plants

    International Nuclear Information System (INIS)

    Yamamoto, Mitsuo; Ito, Kazumi; Yaji, Takeo; Yoshida, Shin; Sakurai, Takako; Matsushita, Shigetoshi.

    1990-01-01

    On the occasion where serious fire accidents were experienced in the past, the need for making flame-retardant wire and cable incombustible took place and has since been generalizing. Various sorts of flame-retardant cables have already been developed and been actually used. From the viewpoint of avoiding the interference with the evacuation and fire-fighting activity in case of fire or the secondary accidents such as corrosion of the distributing panel, etc., the demand for non-halogen flame-retardant cable has rapidly been increasing in recent years in some fields of general industries, because this specific cable would generate the least amount of toxic smoke or corrosive gas even when it should burn. Similar demand has been increasing also for the cable used for nuclear power plants. In this field, earnest desire has been made for the development of non-halogen flame-retardant cable having specific environmental resistance specially required at nuclear power plants in addition to the properties and capacities required in general industries. The authors have continued examinations on the anti-environmental properties of the materials for cable such as long heat resistance, radiation resistance, steam resistance and succeeded in completing various sorts of non-halogen flame-retardant cable for nuclear power plants. In this report, we will introduce various features of the cable we have developed this time as well as the long-term reliability of non-halogen flame-retardant materials. (author)

  12. Detection of a buried object with pulse-compensated wire antennas

    NARCIS (Netherlands)

    Vossen, S.H.J.A.; Tijhuis, A.G.; Lepelaars, E.S.A.M.; Zwamborn, A.P.M.

    2003-01-01

    For the detection of a buried object we consider two straight thin-wire antennas above an interface between two homogeneous dielectric half spaces. One antenna is a transmitting wire and the other is a receiving wire. Our aim is to use this simple antenna set up for the detection of buried objects

  13. Cable Damage Detection System and Algorithms Using Time Domain Reflectometry

    Energy Technology Data Exchange (ETDEWEB)

    Clark, G A; Robbins, C L; Wade, K A; Souza, P R

    2009-03-24

    This report describes the hardware system and the set of algorithms we have developed for detecting damage in cables for the Advanced Development and Process Technologies (ADAPT) Program. This program is part of the W80 Life Extension Program (LEP). The system could be generalized for application to other systems in the future. Critical cables can undergo various types of damage (e.g. short circuits, open circuits, punctures, compression) that manifest as changes in the dielectric/impedance properties of the cables. For our specific problem, only one end of the cable is accessible, and no exemplars of actual damage are available. This work addresses the detection of dielectric/impedance anomalies in transient time domain reflectometry (TDR) measurements on the cables. The approach is to interrogate the cable using time domain reflectometry (TDR) techniques, in which a known pulse is inserted into the cable, and reflections from the cable are measured. The key operating principle is that any important cable damage will manifest itself as an electrical impedance discontinuity that can be measured in the TDR response signal. Machine learning classification algorithms are effectively eliminated from consideration, because only a small number of cables is available for testing; so a sufficient sample size is not attainable. Nonetheless, a key requirement is to achieve very high probability of detection and very low probability of false alarm. The approach is to compare TDR signals from possibly damaged cables to signals or an empirical model derived from reference cables that are known to be undamaged. This requires that the TDR signals are reasonably repeatable from test to test on the same cable, and from cable to cable. Empirical studies show that the repeatability issue is the 'long pole in the tent' for damage detection, because it is has been difficult to achieve reasonable repeatability. This one factor dominated the project. The two-step model

  14. A Psychosocial Approach to Understanding Underground Spaces

    Directory of Open Access Journals (Sweden)

    Eun H. Lee

    2017-03-01

    Full Text Available With a growing need for usable land in urban areas, subterranean development has been gaining attention. While construction of large underground complexes is not a new concept, our understanding of various socio-cultural aspects of staying underground is still at a premature stage. With projected emergence of underground built environments, future populations may spend much more of their working, transit, and recreational time in underground spaces. Therefore, it is essential to understand the challenges and advantages that such environments have to improve the future welfare of users of underground spaces. The current paper discusses various psycho-social aspects of underground spaces, the impact they can have on the culture shared among the occupants, and possible solutions to overcome some of these challenges.

  15. Imaging of buried phosphorus nanostructures in silicon using scanning tunneling microscopy

    Energy Technology Data Exchange (ETDEWEB)

    Oberbeck, Lars [Centre for Quantum Computation and Communication Technology, School of Physics, University of New South Wales, Sydney, New South Wales 2052 (Australia); TOTAL Marketing Services, New Energies, La Défense 10, 92069 Paris La Défense Cedex (France); Reusch, Thilo C. G.; Hallam, Toby; Simmons, Michelle Y., E-mail: n.curson@ucl.ac.uk, E-mail: michelle.simmons@unsw.edu.au [Centre for Quantum Computation and Communication Technology, School of Physics, University of New South Wales, Sydney, New South Wales 2052 (Australia); Schofield, Steven R. [Centre for Quantum Computation and Communication Technology, School of Physics, University of New South Wales, Sydney, New South Wales 2052 (Australia); London Centre for Nanotechnology, UCL, London WC1H 0AH (United Kingdom); Department of Physics and Astronomy, UCL, London WC1E 6BT (United Kingdom); Curson, Neil J., E-mail: n.curson@ucl.ac.uk, E-mail: michelle.simmons@unsw.edu.au [Centre for Quantum Computation and Communication Technology, School of Physics, University of New South Wales, Sydney, New South Wales 2052 (Australia); London Centre for Nanotechnology, UCL, London WC1H 0AH (United Kingdom); Department of Electronic and Electrical Engineering, UCL, London WC1E 7JE (United Kingdom)

    2014-06-23

    We demonstrate the locating and imaging of single phosphorus atoms and phosphorus dopant nanostructures, buried beneath the Si(001) surface using scanning tunneling microscopy. The buried dopant nanostructures have been fabricated in a bottom-up approach using scanning tunneling microscope lithography on Si(001). We find that current imaging tunneling spectroscopy is suited to locate and image buried nanostructures at room temperature and with residual surface roughness present. From these studies, we can place an upper limit on the lateral diffusion during encapsulation with low-temperature Si molecular beam epitaxy.

  16. Ultra thin buried oxide layers formed by low dose Simox process

    Energy Technology Data Exchange (ETDEWEB)

    Aspar, B.; Pudda, C.; Papon, A.M. [CEA Centre d`Etudes de Grenoble, 38 (France). Lab. d`Electronique et d`Instrumentation; Auberton Herve, A.J.; Lamure, J.M. [SOITEC, 38 - Grenoble (France)

    1994-12-31

    Oxygen low dose implantation is studied for two implantation energies. For 190 keV, a continuous buried oxide layer is obtained with a high dislocation density in the top silicon layer due to SiO{sub 2} precipitates. For 120 keV, this silicon layer is free of SiO{sub 2} precipitate and has a low dislocation density. Low density of pin-holes is observed in the buried oxide. The influence of silicon islands in the buried oxide on the breakdown electric fields is discussed. (authors). 6 refs., 5 figs.

  17. Ultra thin buried oxide layers formed by low dose Simox process

    International Nuclear Information System (INIS)

    Aspar, B.; Pudda, C.; Papon, A.M.

    1994-01-01

    Oxygen low dose implantation is studied for two implantation energies. For 190 keV, a continuous buried oxide layer is obtained with a high dislocation density in the top silicon layer due to SiO 2 precipitates. For 120 keV, this silicon layer is free of SiO 2 precipitate and has a low dislocation density. Low density of pin-holes is observed in the buried oxide. The influence of silicon islands in the buried oxide on the breakdown electric fields is discussed. (authors). 6 refs., 5 figs

  18. Imaging of buried phosphorus nanostructures in silicon using scanning tunneling microscopy

    International Nuclear Information System (INIS)

    Oberbeck, Lars; Reusch, Thilo C. G.; Hallam, Toby; Simmons, Michelle Y.; Schofield, Steven R.; Curson, Neil J.

    2014-01-01

    We demonstrate the locating and imaging of single phosphorus atoms and phosphorus dopant nanostructures, buried beneath the Si(001) surface using scanning tunneling microscopy. The buried dopant nanostructures have been fabricated in a bottom-up approach using scanning tunneling microscope lithography on Si(001). We find that current imaging tunneling spectroscopy is suited to locate and image buried nanostructures at room temperature and with residual surface roughness present. From these studies, we can place an upper limit on the lateral diffusion during encapsulation with low-temperature Si molecular beam epitaxy.

  19. Bearing and Range Estimation Algorithm for Buried Object in Underwater Acoustics

    Directory of Open Access Journals (Sweden)

    Dong Han

    2009-01-01

    (DOA of objects and objects-sensors distances, is used in MUSIC algorithm instead of classical model. The influence of the depth of buried objects is discussed. Finally, the numerical results are given in the case of buried cylindrical shells.

  20. A preliminary bending fatigue spectrum for steel monostrand cables

    DEFF Research Database (Denmark)

    Winkler, Jan; Fischer, Gregor; Georgakis, Christos T.

    2011-01-01

    This paper presents the results of the experimental study on the bending fatigue resistance of high-strength steel monostrand cables. From the conducted fatigue tests in the high-stress, low-cycle region, a preliminary bending fatigue spectrum is derived for the estimation of monostrand cable...... service life expectancy. The presented preliminary bending fatigue spectrum of high-strength monostrands is currently unavailable in the published literature. The presented results provide relevant information on the bending mechanism and fatigue characteristics of monostrand steel cables in tension...... and flexure and show that localized cable bending has a pronounced influence on the fatigue resistance of cables under dynamic excitations....

  1. Compact Buried Ducts in a Hot-Humid Climate House

    Energy Technology Data Exchange (ETDEWEB)

    Mallay, D. [Home Innovation Research Labs, Upper Marlboro, MD (United States)

    2016-01-01

    A system of compact, buried ducts provides a high-performance and cost-effective solution for delivering conditioned air throughout the building. This report outlines research activities that are expected to facilitate adoption of compact buried duct systems by builders. The results of this research would be scalable to many new house designs in most climates and markets, leading to wider industry acceptance and building code and energy program approval.

  2. Radiation techology in cable making industry

    International Nuclear Information System (INIS)

    Kourim, P.; Vokal, A.

    1985-01-01

    Electron accelerators are used in radiation cross-linking of elastomer and thermoplastic layers of cable insulation and sheathing. Another application is cross-linking of insulation bands and moulded products to achieve thermal contractibility. Ionizing radiation is used for curing insulation lacquers on winding leads. In Czechoslovakia, problems of radiation curing of silicone rubber have been studied since 1973. Instrumentation has been installed including accelerators. The feasibility has also been studied of radiation cross-linking of insulation and semiconductor cable cores of hose-type trailing cables. Polyethylene mixes have been designed and prepared which are suitable for radiation cross-linking aimed at increasing thermal resistance above 100 degC. (M.D.)

  3. Overcurrent experiments on HTS tape and cable conductor

    DEFF Research Database (Denmark)

    Tønnesen, Ole; Jensen, Kim Høj; Træholt, Chresten

    2001-01-01

    their critical current. In this light, it is important to investigate the response of HTS tapes and cable conductors to overcurrents several times the critical current. A number of experiments have been performed on HTS tapes and cable conductors, with currents up to 20 times the critical current. During...... overcurrent experiments, the voltage, and the temperature were measured as functions of time in order to investigate the dynamic behavior of the HTS tape and cable conductor. After each experiment, damage to the superconductors was assessed by measuring the critical current. Preliminary results show...... that within seconds an HTS tape (critical current=17 A) heats above room temperature with an overcurrent larger than 140 A. Similar overcurrent experiments showed that a HTS cable conductor could sustain damage with overcurrents exceeding 10 times the critical current of the cable conductor....

  4. The Selling of Cable Television 1972.

    Science.gov (United States)

    National Cable Television Association, Inc., Washington, DC.

    The 1972 Cable Television Marketing Workshop reviewed in depth a wide variety of marketing and public relations techniques as they pertain to cable television. The workshop was attended by representatives of commercial television systems throughout the United States; it was intended to disseminate the sales and marketing experience of those…

  5. TMI cable tracer operation and maintenance manual for assembly 417910

    International Nuclear Information System (INIS)

    Sumstine, R.L.

    1983-11-01

    This manual provides technical information and instructions to operate and maintain the cable tracer designed for the Three Mile Island (TMI) Unit 2 Reactor Building. The TMI cable tracer was developed to allow TMI personnel to trace cables in cable trays that may be tested or sectioned for destructive examination

  6. Choice Of Computer Networking Cables And Their Effect On Data ...

    African Journals Online (AJOL)

    Computer networking is the order of the day in this Information and Communication Technology (ICT) age. Although a network can be through a wireless device most local connections are done using cables. There are three main computer-networking cables namely coaxial cable, unshielded twisted pair cable and the optic ...

  7. Underground Storage Tanks in Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Underground storage tank (UST) sites which store petroleum in Iowa. Includes sites which have been reported to DNR, and have active or removed underground storage...

  8. Underground nuclear power plant

    International Nuclear Information System (INIS)

    Takahashi, Hideo.

    1997-01-01

    In an underground-type nuclear power plant, groups of containing cavities comprising a plurality of containing cavities connected in series laterally by way of partition walls are disposed in parallel underground. Controlled communication tunnels for communicating the containing cavities belonging to a control region to each other, and non-controlled communication tunnels for communicating containing cavities belonging to a non-controlled area to each other are disposed underground. A controlled corridor tunnel and a non-controlled corridor tunnel extended so as to surround the containing cavity groups are disposed underground, and the containing cavities belonging to the controlled area are connected to the controlled corridor tunnel respectively, and the containing cavities belonging to the non-controlled area are connected to the non-controlled corridor tunnel respectively. The excavating amount of earth and sand upon construction can be reduced by disposing the containing cavity groups comprising a plurality of containing cavities connected in series laterally. The time and the cost for the construction can be reduced, and various excellent effects can be provided. (N.H.)

  9. Basic prerequisites and the practice of using deep water tables for burying liquid radioactive wastes

    International Nuclear Information System (INIS)

    Spitsyn, V.I.; Pimenov, M.K.; Balukova, V.D.; Leontichuk, A.S.; Kokorin, I.N.; Yudin, F.P.; Rakov, N.A.

    In the USSR, creating reservoirs for liquid radioactive wastes is one of the promising methods of safely disposing of them in deep water tables, in zones with a standing regime or a slow rate of subterranean water exchange. The results of investigations and the practice of burying (the wastes) indicate the reliability and effectiveness of such a method of final waste disposal when the basic requirements of environmental protection are observed. Geological formations and collector strata that guarantee the localization of the liquid radioactive wastes placed in them for many tens and even hundreds of thousands of years can be studied and chosen in different regions. The basic requirements and criteria to which the geological structures and collector strata must correspond for ensuring the safe burial of wastes have been formulated. Wastes are buried only after a comprehensive, scientifically based evaluation of the sanitary-radiation safety for this generation and future ones, taking into account the burial regime and the physico-chemical processes that accompany combining wastes with rocks and stratal waters, as well as the time of holding wastes to maximum permissible concentrations. Positive and negative factors that characterize the method are analyzed. Possible emergency situations with subterranean burial are evaluated. The composition and methods of the geological survey, hydrodynamic, geophysical, physico-chemical and sanitary-radiation investigations; methods of calculating and predicting the movement of wastes underground;methods of preparing wastes for burial and chemical methods of restoring the suitability of wells; design characteristics and conditions of preparing wells for use; methods of estimating heating and processes of radiolysis for a medium containing highly radioactive wastes; methods of operational and remote control of the burial process and the condition of the ambient medium, etc. are briefly examined

  10. Simulations of Si-PIN photodiode based detectors for underground explosives enhanced by ammonium nitrate

    Science.gov (United States)

    Yücel, Mete; Bayrak, Ahmet; Yücel, Esra Barlas; Ozben, Cenap S.

    2018-02-01

    Massive Ammonium Nitrate (NH4-NO3) based explosives buried underground are commonly used in terror attacks. These explosives can be detected using neutron scattering method with some limitations. Simulations are very useful tools for designing a possible detection system for these kind of explosives. Geant4 simulations were used for generating neutrons at 14 MeV energy and tracking them through the scattering off the explosive embedded in soil. Si-PIN photodiodes were used as detector elements in the design for their low costs and simplicity for signal readout electronics. Various neutron-charge particle converters were applied on to the surface of the photodiodes to increase the detection efficiency. Si-PIN photodiodes coated with 6LiF provided the best result for a certain energy interval. Energy depositions in silicon detector from all secondary particles generated including photons were taken into account to generate a realistic background. Humidity of soil, one of the most important parameter for limiting the detection, was also studied.

  11. Underground processing method for radiation-contaminated material and transferring method for buffer molding material

    International Nuclear Information System (INIS)

    Akasaka, Hidenari; Shimura, Satoshi; Asano, Eiichi; Yamagata, Junji; Ninomiya, Nobuo; Kawakami, Susumu.

    1995-01-01

    A bottomed molding material (buffer molding material) is formed into a bottomed cylindrical shape by solidifying, under pressure, powders such as of bentonite into a highly dense state by a cold isotropic pressing or the like, having a hole for accepting and containing a vessel for radiation-contaminated materials. The bottomed cylindrical molding material is loaded on a transferring vessel, and transferred to a position near the site for underground disposal. The bottomed cylindrical molding material having a upwarded containing hole is buried in the cave for disposal. The container for radiation-contaminated material is loaded and contained in the containing hole of the bottomed cylindrical molding material. A next container for radiation-contaminated materials is juxtaposed thereover. Then, a bottomed cylindrical molding material having a downwarded containing hole is covered to the container for the radiation-contaminated material in a state being protruded upwardly. The radiation-contaminated material is thus closed by a buffer material of the same material at the circumference thereof. (I.N.)

  12. Performance evaluation of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...

  13. Wind-Tunnel Investigation of the Aerodynamic Performance of Surface-Modification Cables

    Directory of Open Access Journals (Sweden)

    Hiroshi Katsuchi

    2017-12-01

    Full Text Available The wind-induced vibration of stay cables of cable-stayed bridges, which includes rain-wind-induced vibration (RWIV and dry galloping (DG, has been studied for a considerable amount of time. In general, mechanical dampers or surface modification are applied to suppress the vibration. In particular, several types of surface-modification cable, including indentation, longitudinally parallel protuberance, helical fillet, and U-shaped grooving, have been developed. Recently, a new type of aerodynamically stable cable with spiral protuberances was developed. It was confirmed that the cable has a low drag force coefficient, like an indented cable, and that it prevented the formation of water rivulets on the cable surface. In this study, the stability for RWIV of this cable was investigated with various flow angles and protuberance dimensions in a wind-tunnel test. It was found that the spiral protuberance cable is aerodynamically stable against both RWIV and DG for all test wind angles. The effects of the protuberance dimensions were also clarified. Keywords: Rain-wind-induced vibration, Dry galloping, Stay cable, Wind-tunnel test

  14. Detection and characterization of buried lunar craters with GRAIL data

    Science.gov (United States)

    Sood, Rohan; Chappaz, Loic; Melosh, Henry J.; Howell, Kathleen C.; Milbury, Colleen; Blair, David M.; Zuber, Maria T.

    2017-06-01

    We used gravity mapping observations from NASA's Gravity Recovery and Interior Laboratory (GRAIL) to detect, characterize and validate the presence of large impact craters buried beneath the lunar maria. In this paper we focus on two prominent anomalies detected in the GRAIL data using the gravity gradiometry technique. Our detection strategy is applied to both free-air and Bouguer gravity field observations to identify gravitational signatures that are similar to those observed over buried craters. The presence of buried craters is further supported by individual analysis of regional free-air gravity anomalies, Bouguer gravity anomaly maps, and forward modeling. Our best candidate, for which we propose the informal name of Earhart Crater, is approximately 200 km in diameter and forms part of the northwestern rim of Lacus Somniorum, The other candidate, for which we propose the informal name of Ashoka Anomaly, is approximately 160 km in diameter and lies completely buried beneath Mare Tranquillitatis. Other large, still unrecognized, craters undoubtedly underlie other portions of the Moon's vast mare lavas.

  15. Risk and cost tradeoffs for remote retrieval of buried waste

    Energy Technology Data Exchange (ETDEWEB)

    Hyde, R.A.; Grienbenow, B.E.; Nickelson, D.F.

    1994-12-31

    The Buried Waste Integrated Demonstration is supporting the development, demonstration, testing, and evaluation of a suite of technologies that, when integrated with commercially available technologies, form a comprehensive system for the remediation of radioactive and hazardous buried waste. As a part of the program`s technology development, remote retrieval equipment is being developed and tested for the remediation of buried waste. During remedial planning, several factors are considered when choosing remote versus manual retrieval systems. Time that workers are exposed to radioactivity, chemicals, air particulate, and industrial hazards is one consideration. The generation of secondary waste is also a consideration because it amounts to more waste to treat and some wastes may require special handling or treatment. Cost is also a big factor in determining whether remote or manual operations will be used. Other considerations include implementability, effectiveness, and the number of required personnel. This paper investigates each of these areas to show the risk and cost benefits and limitations for remote versus manual retrieval of buried waste.

  16. NEPO cable system aging management programs

    International Nuclear Information System (INIS)

    Toman, G.

    2002-01-01

    Full text: Cable polymer aging and condition monitoring is being studied in detail under the Nuclear Energy Plant Optimization Program (NEPO) that is co-sponsored by the U.S. Department of Energy and EPRI. Significant advances in modeling of polymer aging and condition monitoring have occurred and continue to be developed. The activities include: Analysis of the linearity of the Arrhenius model to room temperature; Development of a wear-out technique for determining remaining life of cable polymers; Determination of the aging fragility point for composite EPR/CSPE insulation with respect to LOCA function; Development of visual/tactile training aids for cable assessment; Development of a totally new nuclear magnetic resonance condition monitoring technique; Assessment of existing techniques with regard to repeatability, accuracy and ease of use. Through use of highly precise oxygen consumption experiments, the linearity of the Arrhenius model is being evaluated. In these experiments, polymer is placed in vials with a known amount of oxygen and aged at much lower temperatures than is possible with standard accelerated aging techniques. aging results are possible at room temperature. The technique is being applied to commonly used insulation and jacket polymers. The wear-out technique allows highly non-linear aging behavior to be made linear. The wearout point of a polymer is determined through high-rate aging and use of a condition monitoring technique to establish the end point. Then, micro-samples of cable that have been naturally aged are subjected to high rate aging to the same end point. The ratio of the remaining high rate aging period to the total high rate aging time provides a linear indication of the remaining service time. Initial screening of nuclear plant cable systems can use visual/tactile techniques to identify cable that has aged significantly. Training aids have been developed by developing sets of specimens with accelerated aging ranging from none

  17. Computer-Aided Engineering Of Cabling

    Science.gov (United States)

    Billitti, Joseph W.

    1989-01-01

    Program generates data sheets, drawings, and other information on electrical connections. DFACS program, centered around single data base, has built-in menus providing easy input of, and access to, data for all personnel involved in system, subsystem, and cabling. Enables parallel design of circuit-data sheets and drawings of harnesses. Also recombines raw information to generate automatically various project documents and drawings, including index of circuit-data sheets, list of electrical-interface circuits, lists of assemblies and equipment, cabling trees, and drawings of cabling electrical interfaces and harnesses. Purpose of program to provide engineering community with centralized data base for putting in, and gaining access to, functional definition of system as specified in terms of details of pin connections of end circuits of subsystems and instruments and data on harnessing. Primary objective to provide instantaneous single point of interchange of information, thus avoiding

  18. Preparation and infrared absorption properties of buried SiC layers

    International Nuclear Information System (INIS)

    Yan Hui; Chen Guanghua; Wong, S.P.; Kwok, R.W.M.

    1997-01-01

    Buried SiC layers were formed by using a metal vapor vacuum arc (MEVVA) ion source, with C + ions implanted into Si substrates under different doses. In the present study, the extracted voltage was 50 kV and the ion dose was varied from 3.0 x 10 17 to 1.6 x 10 18 cm -2 . According to infrared absorption measurements, it was fount that the structure of the buried SiC layers depended on the ion dose. Moreover, the results also demonstrated that the buried SiC layers including cubic crystalline SiC could be synthesized at an averaged substrate temperature of lower than 400 degree C with the MEVVA ion source

  19. Assessment of sodium conductor distribution cable

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-06-01

    The study assesses the barriers and incentives for using sodium conductor distribution cable. The assessment considers environmental, safety, energy conservation, electrical performance and economic factors. Along with all of these factors considered in the assessment, the sodium distribution cable system is compared to the present day alternative - an aluminum conductor system. (TFD)

  20. Detection of Buried Objects by Means of a SAP Technique: Comparing MUSIC- and SVR-Based Approaches

    Science.gov (United States)

    Meschino, S.; Pajewski, L.; Pastorino, M.; Randazzo, A.; Schettini, G.

    2012-04-01

    This work is focused on the application of a Sub-Array Processing (SAP) technique to the detection of metallic cylindrical objects embedded in a dielectric half-space. The identification of buried cables, pipes, conduits, and other cylindrical utilities, is an important problem that has been extensively studied in the last years. Most commonly used approaches are based on the use of electromagnetic sensing: a set of antennas illuminates the ground and the collected echo is analyzed in order to extract information about the scenario and to localize the sought objects [1]. In a SAP approach, algorithms for the estimation of Directions of Arrival (DOAs) are employed [2]: they assume that the sources (in this paper, currents induced on buried targets) are in the far-field region of the receiving array, so that the received wavefront can be considered as planar, and the main angular direction of the field can be estimated. However, in electromagnetic sensing of buried objects, the scatterers are usually quite near to the antennas. Nevertheless, by dividing the whole receiving array in a suitable number of sub-arrays, and by finding a dominant DOA for each one, it is possible to localize objects that are in the far-field of the sub-array, although being in the near-field of the array. The DOAs found by the sub-arrays can be triangulated, obtaining a set of crossings with intersections condensed around object locations. In this work, the performances of two different DOA algorithms are compared. In particular, a MUltiple SIgnal Classification (MUSIC)-type method [3] and Support Vector Regression (SVR) based approach [4] are employed. The results of a Cylindrical-Wave Approach forward solver are used as input data of the detection procedure [5]. To process the crossing pattern, the region of interest is divided in small windows, and a Poisson model is adopted for the statistical distribution of intersections in the windows. Hypothesis testing procedures are used (imposing