  1. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    OpenAIRE

    Spillane, John P; Oyedele, Lukumon O; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E; Tijani, Iyabo K

    2011-01-01

    The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues...

  2. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    Directory of Open Access Journals (Sweden)

    Spillane, John P

    2011-12-01

    Full Text Available The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

  3. UK manufacturers construction joint venture

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This report examines the legal and commercial framework for UK manufacturers to collaborate in a construction venture for a small combustion/steam cycle power plant fueled with biomass. The integration of technology and project plan, the working capital and capitalisation, financial aspects, the market plan, turnkey packages, joint venture entities, and collaboration are discussed. (UK)

  4. Sustainability in the UK construction minerals industry

    OpenAIRE

    Mitchell, Clive

    2015-01-01

    Sustainability in the UK construction minerals industry Clive Mitchell, Industrial Minerals Specialist, British Geological Survey, Nottingham, UK Email: Sustainability is not just about environmental protection it also concerns biodiversity, community relations, competence, employment, geodiversity, health and safety, resource efficiency, restoration and stakeholder accountability. The UK construction minerals industry aims to supply essential materials in a sustainabl...

  5. The siting of UK nuclear reactors.

    Science.gov (United States)

    Grimston, Malcolm; Nuttall, William J; Vaughan, Geoff

    2014-06-01

    Choosing a suitable site for a nuclear power station requires the consideration and balancing of several factors. Some 'physical' site characteristics, such as the local climate and the potential for seismic activity, will be generic to all reactors designs, while others, such as the availability of cooling water, the area of land required and geological conditions capable of sustaining the weight of the reactor and other buildings will to an extent be dependent on the particular design of reactor chosen (or alternatively the reactor design chosen may to an extent be dependent on the characteristics of an available site). However, one particularly interesting tension is a human and demographic one. On the one hand it is beneficial to place nuclear stations close to centres of population, to reduce transmission losses and other costs (including to the local environment) of transporting electricity over large distances from generator to consumer. On the other it is advantageous to place nuclear stations some distance away from such population centres in order to minimise the potential human consequences of a major release of radioactive materials in the (extremely unlikely) event of a major nuclear accident, not only in terms of direct exposure but also concerning the management of emergency planning, notably evacuation.This paper considers the emergence of policies aimed at managing this tension in the UK. In the first phase of nuclear development (roughly speaking 1945-1965) there was a highly cautious attitude, with installations being placed in remote rural locations with very low population density. The second phase (1965-1985) saw a more relaxed approach, allowing the development of AGR nuclear power stations (which with concrete pressure vessels were regarded as significantly safer) closer to population centres (in 'semi-urban' locations, notably at Hartlepool and Heysham). In the third phase (1985-2005) there was very little new nuclear development, Sizewell

  6. Quality assurance during site construction

    International Nuclear Information System (INIS)

    Eymess, K.J.; Haas, R.; Wellnitz, G.

    1980-01-01

    Quality Assurance for Nuclear Power Plants under consideration of pipe assembling. Flow of Quality Requirements during: - Desing - Construction - Procurement - Prefabrication - Site. Organizational Requirements and Measurements during Erection: - Incoming Control - Material Storage - Surveillance of Tools - Weld Surveillance - Nondestructive Testing - Cleaning - Final Documentation. Qualification and Training of QA Personnel. (orig.)

  7. Sun safety in construction: a U.K. intervention study.

    Science.gov (United States)

    Houdmont, J; Madgwick, P; Randall, R

    2016-01-01

    Interventions to promote sun safety in the U.K. construction sector are warranted given the high incidence of skin cancer attributable to sun exposure relative to other occupational groups. To evaluate change in sun safety knowledge and practices among construction workers in response to an educational intervention. A baseline questionnaire was administered, followed by a bespoke sector-specific DVD-based intervention. At 12-month follow-up, participants completed a further questionnaire. Analyses were conducted on a sample of 120 workers (intervention group, n = 70; comparison group, n = 50). At follow-up, the proportion of intervention group participants that reported correct sun safety knowledge was not significantly greater than at baseline. However, the intervention group demonstrated significant positive change on 9 out of 10 behavioural measures, the greatest change being use of a shade/cover when working in the sun followed by regularly checking skin for moles or unusual changes. Exposure to this intervention was linked to some specific positive changes in construction workers' self-reported sun safety practices. These findings highlight the potential for educational interventions to contribute to tackling skin cancer in the UK construction sector. The findings support the development of bespoke educational interventions for other high-risk outdoor worker groups. © The Author 2015. Published by Oxford University Press on behalf of the Society of Occupational Medicine. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  8. Turbidity monitoring at select MDOT construction sites.

    Science.gov (United States)

    2012-06-01

    The objective of this project was to establish baseline turbidity conditions at select construction : sites by establishing a water quality monitoring program and documenting MDOT approved : BMPs on site. In 2009 the United States Environmental Prote...

  9. Zero carbon homes: Perceptions from the UK construction industry

    International Nuclear Information System (INIS)

    Heffernan, Emma; Pan, Wei; Liang, Xi; Wilde, Pieter de

    2015-01-01

    The take-up of the many voluntary energy efficiency standards which exist in the UK and internationally has been limited. As a result, governments have recognised the need to introduce mandatory schemes through legislation, e.g. from 2016 all new build homes in the UK will be required to achieve zero carbon in regulated energy consumption. However, as 2016 approaches, very few zero carbon homes are being delivered. This paper explores the drivers and barriers for zero carbon homebuilding. The perceptions of the wider construction industry were gathered through a series of semi-structured interviews with professionals involved in commissioning, designing, constructing and regulating housing. The results show that, whilst drivers for zero carbon homebuilding exist, the barriers are currently perceived to be greater than the drivers. The barriers are categorised into five groups: economic, skills and knowledge, industry, legislative and cultural. Mechanisms for policy and industry support for the delivery of zero carbon homes are identified to address these barriers. The research findings highlight the need for a clear and robust policy framework for the forthcoming standard. The Government and industry must prioritise raising public awareness of the need for and benefits of zero carbon homes to help develop market demand. - Highlights: • The strongest drivers were perceived to be in the legislative and economic themes. • More barriers were identified than drivers or potential support mechanisms. • Economic and skills and knowledge barriers were perceived as the most significant. • Uncertainty in zero carbon homes policy is a barrier to zero carbon homebuilding. • Proposed support mechanisms include zero carbon champions and self-build homes

  10. Management of construction safety at RR site

    International Nuclear Information System (INIS)

    Pathak, B.C.; Khatsuriya, J.R.

    2016-01-01

    Construction industries are one of the most hazardous industries and hence, promotion of safety remains one of the greatest challenges facing construction industry today. According to ILO estimates: Each year at least 60,000 fatal accidents occur on construction sites around the world or one fatal accident every ten minutes. One in six fatal accidents at work occurs on a construction site. In industrialized countries, as many as 25-40 per cent of work related deaths occur on construction sites, even though the sector employs only 6-10 per cent of the workforce. The number of fatalities occurring from construction work in India is also quite disturbing. Though, the fall of person from height and through openings were the major causes for fatal /serious accidents, the risk of fatal accident involving material handling equipment, either during handling or its maintenance is also significantly high due to use of large number of material handling equipments during construction work. (author)

  11. Efficient on-site construction

    DEFF Research Database (Denmark)

    Thuesen, Christian Langhoff; Hvam, Lars

    2011-01-01

    selected market – optimising cost and value. Based on the platform, the company has managed to create a high-quality product at low cost. In fact, they have managed to reduce costs by more than 30 per cent, enabling the company to sell houses to people that normally would not be able to afford a house...... from the German platform such as: platform does not imply that “off-site manufacturing” is the most optimal production method, rather it is a matter of handling complexity; strong commitment and loyalty from the whole organization is needed; importance of having a specific customer focus (target...

  12. Early Regulatory Engagement for Successful Site Remediation: the UK Experience - 13173

    International Nuclear Information System (INIS)

    Maitland, R.P.; Senior, D.

    2013-01-01

    The Office for Nuclear Regulation (ONR) is an independent safety, security and transport regulator of the UK nuclear industry. ONR regulates all civil nuclear reactor power stations, fuel manufacture, enrichment, spent fuel reprocessing, most defence sites and installations that store and process legacy spent fuel and radioactive waste. The responsibility for funding and strategic direction of decommissioning and radioactive waste management of state owned legacy sites has rested solely with the Nuclear Decommissioning Authority (NDA) since 2005. A key component of NDA's mandate was to encourage new strategic approaches and innovation to dealing with the UK's waste legacy and which deliver value-for-money to the UK taxpayer. ONR, as an agency of the Health and Safety Executive, is entirely independent of NDA and regulates all prescribed activities on NDA's sites. NDA's competition of site management and closure contracts has attracted significant international interest and the formation of consortia comprised of major British, US, French and Swedish organizations bidding for those contracts. The prominence of US organizations in each of those consortia reflects the scale and breadth of existing waste management and D and D projects in the US. This paper will articulate, in broad terms, the challenges faced by international organizations seeking to employ 'off-the-shelf' technology and D and D techniques, successfully employed elsewhere, into the UK regulatory context. The predominantly 'goal-setting' regulatory framework in the UK does not generally prescribe a minimum standard to which a licensee must adhere. The legal onus on licensees in the UK is to demonstrate, whatever technology is selected, that in its applications, risks are reduced 'So Far As Is Reasonably Practicable' or 'SFAIRP'. By the nature of its role, ONR adopts a conservative approach to regulation; however ONR also recognises that in the decommissioning (and ultimately the site closure) domain

  13. Quality assurance during site construction

    International Nuclear Information System (INIS)

    Dommke, J.; Jurgutat, H.

    1980-01-01

    During the time of planing and construction of a nuclear power plant, the following proceeding is approved: - the deliverer of a nuclear power plant provides the reports fixing the quality assurance program, it means that he is responsible to write the safety analysis report, the specifications for the erection of the components, the working manuals and specifications for testing (eg nondestr. testing) - the manufacturing of components or systems will be controlled by an own independent quality assurance group, provided that this group was checked by the quality assurance group of the applicant - the TUeV with its independent assessors will fix the requirements relating to quality assurance in its assessment. On this basis the examination of the applicants specifications, working manuals, testing specifications will be done. The efficiency of quality assurance at the manufacturer and at the applicant will be checked by the TUeV specialists by considering specifications of modifications, repairs or tolerances. A mean point of the quality assurance in Germany is the dynamic adjustment, of an action on the latest state of engineering or science. If there exists a change of rules or guidelines, the quality assurance requirements have to be fit on this state in so far as it is feasible from the technical point of view. (orig./RW)

  14. Overview of the site selection, geological and engineering problems facing radioactive waste disposal at Sellafield, UK

    International Nuclear Information System (INIS)

    Haszeldine, R.S.; Smythe, D.K.

    1996-01-01

    UK Nirex Ltd is the company charged with finding a suitable site for the disposal of radioactive waste in the United Kingdom. Since 1991, Nirex has concentrated its site investigation work at Longlands Farm which is owned by British Nuclear Fuels Ltd and is near their Sellafield site. Planning permission was sought for the development of an underground Rock Characterisation Facility (RCF) at the site in 1994. A public Planning Inquiry began in September 1995. A wide range of scientific and technical objections were put by expert witnesses against the Nirex Proposal. These witnesses were co-ordinated by three Objecting Organisations - Cumbria County Council, Friends of the Earth and Greenpeace. Their written evidence is presented in this book. The grounds of the objections include: the inadequacy of the methodology adopted by Nirex for site selection and investigation; The unsuitability of the site geology, hydrology and geochemistry; that construction of the RCF would destroy the data essential to deciding site suitability; that the RCF would provide a conduit for the release of radioactivity; a number of features in the Nirex risk assessment that would lead to an underestimation of the potential risks of a repository at this site. (UK)

  15. Quality assurance during site construction. Pt. 6

    International Nuclear Information System (INIS)

    Schwarz, N.

    1980-01-01

    Scope of 'Site Construction concerning Electrical Equipment' (Installation, erection, commissioning, operation): tasks and organization of Siemens-Field Services Division; organization on site; receiving, incoming inspection and storage of material; installation, erection; (drawings, instructions, documents / execution of installation / personnel qualification). Non conformance and corrective actions; quality records; internal audits. (orig.)

  16. Prospective safety performance evaluation on construction sites.

    Science.gov (United States)

    Wu, Xianguo; Liu, Qian; Zhang, Limao; Skibniewski, Miroslaw J; Wang, Yanhong

    2015-05-01

    This paper presents a systematic Structural Equation Modeling (SEM) based approach for Prospective Safety Performance Evaluation (PSPE) on construction sites, with causal relationships and interactions between enablers and the goals of PSPE taken into account. According to a sample of 450 valid questionnaire surveys from 30 Chinese construction enterprises, a SEM model with 26 items included for PSPE in the context of Chinese construction industry is established and then verified through the goodness-of-fit test. Three typical types of construction enterprises, namely the state-owned enterprise, private enterprise and Sino-foreign joint venture, are selected as samples to measure the level of safety performance given the enterprise scale, ownership and business strategy are different. Results provide a full understanding of safety performance practice in the construction industry, and indicate that the level of overall safety performance situation on working sites is rated at least a level of III (Fair) or above. This phenomenon can be explained that the construction industry has gradually matured with the norms, and construction enterprises should improve the level of safety performance as not to be eliminated from the government-led construction industry. The differences existing in the safety performance practice regarding different construction enterprise categories are compared and analyzed according to evaluation results. This research provides insights into cause-effect relationships among safety performance factors and goals, which, in turn, can facilitate the improvement of high safety performance in the construction industry. Copyright © 2015 Elsevier Ltd. All rights reserved.

  17. Operations Management on The Construction Site

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    this as a refreshing renewal and improvement of practical operations management at the site. However this paper will present a first step of development of a new approach to operations management at the building site, which at the same time builds on, and criticize lean construction for missing the point...... of the knowledge economy. This endeavour is carried out in two ways. First by a reading of the operations management literature. Juxtaposing this with lean construction extentions and the critique developed by other scholars. And also drawing on human resource management approaches. Second through a series......” scheme. In both directions it is revealed that the human resource and knowledge element of building processes is largely left untouched by lean construction methods. It is suggested to introduce at least two more dimensions of operations management at the site than the ones offered in lean construction...

  18. Studies on Labour Safety in Construction Sites

    Directory of Open Access Journals (Sweden)

    S. Kanchana

    2015-01-01

    Full Text Available Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites.

  19. Studies on Labour Safety in Construction Sites

    Science.gov (United States)

    Kanchana, S.; Sivaprakash, P.; Joseph, Sebastian

    2015-01-01

    Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites. PMID:26839916

  20. Construction experience at the Canonsburg UMTRA site

    International Nuclear Information System (INIS)

    Thiers, G.R.; Farnes, L.L.; Wathen, T.R.

    1985-01-01

    Construction of on-site stabilization for over 225,000 cubic yards of abandoned uranium mill tailings in Canonsburg, Pennsylvania, began in October 1983, and is scheduled to be completed in December 1985. This paper describes selected construction experience through October 1984. The following selected events and construction items are discussed in this paper: 1. Construction and operation of a 36,000-square foot, fabric-lined sedimentation basin, including difficulties associated with installation of the liner; 2. Assembly and start-up of the contaminated water treatment plant; 3. Construction of the encapsulation cell test fills, to confirm the performance specification governing the compaction; 4. Excavation, relocation, and placement of contaminated materials, including moisture control and density testing of the radioactive materials; 5. Construction difficulties, including disposition of local leachate from the abandoned industrial complex and an increase in the volume of contaminated material to be encapsulated

  1. Quality assurance during site construction. Pt. 1

    International Nuclear Information System (INIS)

    Mueller, J.

    1980-01-01

    The first part of the lecture deals with the Quality Assurance system on the construction site in general. Basic site-related problems during contract implementation and the QA system requirements resulting from them are presented. The compilation of these requirements in a QA program and its inclusion in the site manual in written form are explained. Site organization, personnel qualification and procedures are referred to. Whereas the first part shows what is to be done, the second part shows how it can be put into practice on the site. All the essential points for the assurance of quality are addressed. They include, e.g., review of documents, incoming goods control, in-process surveillance, store controls, identification of components and systems, dealing with changes and deviations, documentation control and audits. By means of examples taken form practice the necessity of a well-functioning QA system, and the importance of quality-assuring measures on the site are pointed out. (orig.)

  2. An Exploration of the Relationship between Training Grants and Profitability of UK Construction Companies

    Science.gov (United States)

    Abdel-Wahab, Mohamed; Dainty, Andrew R. J.; Ison, Stephen G.; Hazlehurst, Guy

    2008-01-01

    A levy/grant system exists in the UK construction industry to provide financial support for companies undertaking training activities. With the current UK government skills policy, there is an emphasis on ensuring that training support provided to employers is aimed at enhancing companies' profitability. This paper explores the profitability of…

  3. Activities on the site during construction phase

    International Nuclear Information System (INIS)

    Fickel, O.F.

    1977-01-01

    A survey is given of the work done on the site from site-opening till turn over of the plant to the client. After a short introduction to time schedules, manpower on site, site facilities and civil work and constructions, the commissioning and trial operation phase is discussed in detail. This phase begins with finishing the assembly of individual systems and components and ends with the trial operation and the acceptance measurement. During this period the subsystems are started-up in a useful sequence, first from cold, then from hot conditions and are finally operated as a total with nuclear energy. The single steps are: a) commissioning of indivudal systems; b) hot functional test 1 (without fuels) c) baseline inspection at the reactor pressure vessel; d) hot functional test 2 (with fuels); e) preparation for first criticality; f) postcriticality test program; g) trial operation: h) acceptance measurement. (HP) [de

  4. A nuclear inspector's perspective on decommissioning at UK nuclear sites

    International Nuclear Information System (INIS)

    Robinson, I.F.

    1999-01-01

    The legislative framework used to regulate decommissioning of nuclear facilities in the UK is described. Pre-licensing requirements are outlined and the operation of a nuclear site licence is described. Mention is made of safety assessment and the published principles which are NII's view of what constitutes good practice within the nuclear industry. HSE's approach to the regulation of nuclear decommissioning is described before discussing issues associated with optioneering, the timing of decommissioning, occupational doses and public doses. It is noted that the professional approach taken by the nuclear industry within the framework of the existing regulatory requirements has resulted in considerable reductions in occupational dose over the last few years. The de-licensing process is described in the context of terminating a licensee's period of responsibility for safety, and principles by which 'no danger' may be judged are described. Impending new legislation on environmental impact assessment in relation to decommissioning nuclear reactors is mentioned. It is concluded that a powerful and flexible method of regulatory control is in place with regard to nuclear decommissioning. (author)

  5. PHWR safety: design, siting and construction

    International Nuclear Information System (INIS)

    Sharma, V.K.

    2002-01-01

    In all activities associated with NPPs viz. siting, design, construction, commissioning and operation, safety is given overriding importance. The safety design principles of PHWRs are based on defence-in-depth approach, physical and functional separation between process and safety systems and also among various safety systems, redundancy to meet single failure criteria and postulation of a number of design basis events for which the plant must be designed. Apart from engineered safety systems, PHWRs have inherent characteristics which contribute to safety. In siting of a NPP, it is required to ensure that the given site does not pose undue radiological hazard to public and the environment both during normal operation as well as during and following an accident condition. For this purpose, all site related external events, both natural and man induced, are assessed for their effect on the plant and are considered as part of the design basis. Possible radiological impact of the NPP on environment and surrounding population is assessed and ensured to be within acceptable limits. During construction phase, it is essential that the NPP be built in accordance with design intent and with required quality of workmanship to ensure that the NPP will remain safe during all states of operation. This is achieved through careful execution and QA activities encompassing all aspects of component fabrication at manufacturer works, civil construction, site erection, assembly, and commissioning. Future trends in nuclear safety will continue to be based on existing principles which have proved to be sound. These will be further strengthened by features such as increasing use of passive means of performing safety functions and a more explicit treatment of severe accidents. (author)

  6. Early Regulatory Engagement for Successful Site Remediation: the UK Experience - 13173

    Energy Technology Data Exchange (ETDEWEB)

    Maitland, R.P.; Senior, D. [Office for Nuclear Regulation, Redgrave Court, Liverpool L20 7HS (United Kingdom)

    2013-07-01

    decommissioning (and ultimately the site closure) domain, it is often necessary to consider and support novel approaches to achieve the nationally desired end-state. Crucial to successful and compliant operation in this regulatory environment is early and sustained engagement of the contractor with the regulator. There must be a 'no-surprises' culture to engender regulatory confidence early in a project. The paper considers some of the challenges facing international prime and lower tier contractors when undertaking D and D contracts in the UK, and emphasizes the importance of constructive and transparent dialogue with all regulators to sustain confidence at all stages of a major decommissioning project. The paper will also articulate ONR's strategy to increase collaboration with the US Department of Energy in light of increasing UK-US synergy in the area of waste management and to benchmark respective regulatory approaches. (authors)

  7. Constructing Knowledge: The Case of Leisure Management in the UK

    Science.gov (United States)

    Pitchford, Andy; Bacon, William

    2005-01-01

    Models of curricula development in higher education pay scant attention to the role of self-interested actors in the construction of knowledge. Rather, it is assumed that curricula develop on the basis of fission within disciplines, fusion between fields, the exertion of pressure by the state or other stakeholders, or the development of knowledge…

  8. What is "new" about fatherhood? The social construction of fatherhood in France and the UK

    OpenAIRE

    Gregory, Abigail; Milner, Susan

    2011-01-01

    This article reviews the way that fatherhood is constructed in the public discourse and more broadly in the public sphere in the UK and France by examining (1) the fatherhood regime and its influence on the construction of fatherhood in the two countries; (2) gender attitudes and parenting roles; and (3) popular images of fatherhood, particularly as represented in women’s and men’s magazines in France and in the UK. The authors explore to what extent ‘‘new’’ features of fatherhood in the two ...

  9. Turbidity monitoring equipment and methodology evaluation at MDOT construction sites.

    Science.gov (United States)

    2014-12-01

    State Study 261 is a continuation of State study 225, "Turbidity Monitoring at Select : MDOT Construction Sites", which was successful in establishing baseline stream data : at several active construction sites. State Study 261 focused on the equipme...

  10. Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts

    Directory of Open Access Journals (Sweden)

    Saad Sarhan

    2013-03-01

    Full Text Available Performance measurement has received substantial attention from researchers and the construction industry over the past two decades. This study sought to assess UK practitioners’ awareness of the importance of the use of appropriate performance measures and its role in supporting the application of Lean Construction (LC concepts. To enable the study to achieve its objectives, a review of a range of measurements developed to evaluate project performance including those devoted to support LC efforts was conducted. Consequently a questionnaire survey was developed and sent to 198 professionals in the UK construction industry as well as a small sample of academics with an interest in LC. Results indicated that although practitioners recognise the importance of the selection of non-financial performance measures, it has not been properly and widely implemented. The study identified the most common techniques used by UK construction organisations for performance measurement, and ranked a number of non-financial key performance indicators as significant. Some professed to have embraced the Last Planner System methodology as a means for performance measurement and organisational learning, while further questioning suggested otherwise. It was also suggested that substance thinking amongst professionals could be a significant hidden barrier that militates against the successful implementation of LC.

  11. Post-accession migration in construction and trade union responses in Denmark, Norway and the UK

    DEFF Research Database (Denmark)

    Eldring, Line; Fitzgerald, Ian; Arnholtz, Jens

    2012-01-01

    The article compares trade union responses in Denmark, Norway and the UK to the arrival of construction workers from the new EU member states. Organizing has been seen as a crucial means to avoid low-wage competition and social dumping. We analyse how the unions developed strategies for recruiting...

  12. From principles to practice in site remediation: Specific application in the UK

    International Nuclear Information System (INIS)

    Hill, M.; Higgins, P.; Longley, P.; Kerrigan, E.; Smith, G.M.

    2005-01-01

    As a result of wide-scale application of radioactive materials in research, medicine, defence, nuclear power and industry, significant areas of land have become contaminated with radioactivity. Whilst many practices aim to minimise the potential for contamination, there remain a number of sites that are contaminated as a result of historical discharges and accidental releases. In the UK, defence sites are being remediated to be released for redevelopment. International principles, national guidelines and best practice are taken into account, but quantities of low or very low activity radioactive waste are generated, and require disposal. This paper discusses these issues and illustrates their implementation at a specific site in the UK. (author)

  13. Making the link: climate policy and the reform of the UK construction industry

    International Nuclear Information System (INIS)

    Sorrell, Steve

    2003-01-01

    This paper explores the barriers to energy efficiency in the construction of non-domestic buildings in the UK. The source of the barriers is argued to lie in the organisation of the construction industry, including the linear design process, the reliance on cost-based competitive tendering and the incentives placed upon different actors. The consequences include oversizing of equipment, reduced quality, neglect of whole life costs and lack of integrated design. Each of these problems can usefully be interpreted using concepts from the new institutional economics. While the barriers are well known to construction industry specialists, they are relatively neglected in the academic literature on energy policy. Furthermore, conventional policy measures such as building regulations leave these barriers largely untouched. The UK construction industry is currently undergoing a series of reforms which aim to change the relationship between different actors and to achieve improvements in product quality and productivity. While these reforms have the potential to address many of the barriers, the reform agenda makes practically no reference to sustainability. This paper argues that climate policy objectives must be integrated into the reform agenda if the UK is to begin the transition to a low carbon built environment

  14. A regulatory view of nuclear containment on UK licensed sites

    International Nuclear Information System (INIS)

    Bradford, P.M.; McNair, I.J.

    1997-01-01

    Members of the UK regulatory body, HM Nuclear Installations Inspectorate (NII) have previously presented conference papers and official reports which have dealt separately with either reactor applications or chemical plant applications. The objective of this paper is to draw together a brief overview of the role of containment in protecting against potential radiological and related hazards, and to describe the factors which influence the NII's assessment of containment safety cases. It draws upon the NII's experience of regulating many types of nuclear facility, from those designed in the late 1940s through to the modern plants, such as Sizewell 'B' and THORP. The paper reviews the legislative and regulatory background within which the facilities exist and are operated. Finally, the paper reviews recent, ongoing and planned research in the field of containment, which has been designed to behave under challenge. (author)

  15. UK nuclear installations

    International Nuclear Information System (INIS)

    Gronow, W.S.

    Regulations and conditions for the commissioning of nuclear power plants in the UK, their siting, licence conditions, design safety assessment, inspection during construction and conditions for safety in operation are listed. (J.P.)

  16. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Site layout, site-specific erection plan and construction... Steel Erection § 1926.752 Site layout, site-specific erection plan and construction sequence. (a... strength or sufficient strength to support the loads imposed during steel erection. (c) Site layout. The...

  17. Geohazards affecting UNESCO WHL sites in the UK observed from geological data and satellite InSAR

    Science.gov (United States)

    Cigna, Francesca; Tapete, Deodato; Lee, Kathryn

    2016-08-01

    Geohazards pose significant threats to cultural and natural heritage worldwide. In the UK, only 1 out of 29 UNESCO World Heritage List (WHL) sites has been inscribed on the list of World Heritage in Danger, whilst it is widely accepted that many more could be affected by geohazards. In this paper we set out the foundations of a methodological approach to analyse geological, geohazard and remote sensing data available at the British Geological Survey to retrieve an overview of geohazards affecting the UK WHL sites. The Castles and Town Walls (constructed in the time of King Edward I) in Gwynedd in north Wales are used as test sites to showcase the methodology for geohazard assessment at the scale of individual property also to account for situations of varied geology and local topography across multiproperty WHL sites. How such baseline geohazard assessment can be combined with space-borne radar interferometry (InSAR) data is showcased for the four UNESCO WHL sites located in Greater London. Our analysis feeds into the innovative contribution that the JPI-CH project PROTHEGO `PROTection of European cultural HEritage from GeOhazards' (www.prothego.eu) is making towards mapping geohazards in the 400+ WHL sites of Europe by exploiting non-invasive remote sensing methods and surveying technologies.

  18. BIM for Construction Site Logistics Management

    Directory of Open Access Journals (Sweden)

    K. Whitlock

    2018-01-01

    Full Text Available Emerging Building Information Modelling (BIM has been hailed as a revolutionary technology and information management process that facilitates collaboration and more efficient design and construction processes through innovative 3D modelling software, open access to information and multidisciplinary integration. The deadline of compliance to BIM level 2 on all public sector centrally procured construction projects has expired leaving many construction firms anxious to adopt BIM. Most common documented applications of BIM have been in the areas of architectural and structural design, quantity surveying, construction project management, and sustainability with very limited peer-reviewed studies on construction logistics management. The aim of this study is to investigate how BIM can be applied to construction logistics management. This study adopts a desk-top approach, with articles sources from renowned scientific databases such as ScienceDirect, Google Scholar and Emerald. The study culminated in the identification of benefits and barriers of adopting BIM for construction logistics management. Given only a desk-top approach has been used, the recommendation for future study is to build on this to conduct an empirical study using both qualitative and quantitative data. This will provide an in-depth understanding of the use of BIM for construction logistics management and open opportunities for further research.

  19. Construction Site Workers’ Awareness on Using Safety Equipment: Case Study

    OpenAIRE

    Ulang N. Md; Salim N. S.; Baharum F.; Agus Salim N.A.

    2014-01-01

    Construction sector is an important sector and contributed significantly to national development. However, this sector poses higher risk to accident. This is due to fact that construction site can be considered as a dangerous zone to workers and to the public. Due to the variety of cases occurs on site, the contractor will usually have to pay the cost related to accidents in the form of higher insurance premium. Despite various measures, accidents still occur at construction sites. Personal P...

  20. Construction plant requirements for nuclear sites

    International Nuclear Information System (INIS)

    Tatum, C.B.; Harris, J.A.

    1981-01-01

    Planning and developing the temporary construction plant facilities for a nuclear project is equivalent to providing utility services for a small city. Provision of adequate facilities is an important factor in the productivity of both the manual and non-manual work force. This paper summarizes construction facility requirements for a two unit (1300 MWe each) nuclear project. Civil, mechanical and electrical facilities are described, including design, installation and operation. Assignment of responsibility for specific work tasks regarding the construction plant is also discussed. In presenting this data, the authors seek to transfer experience and assist in the provision of adequate facilities on future projects

  1. AN INVESTIGATION INTO THE BARRIERS FACING BLACK AND MINORITY ETHNICS WITHIN THE UK CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Vian Ahmed

    2008-12-01

    Full Text Available The UK construction industry is one of the largest employers, positioned as the country’s top employer with over two million employees and projected to continue growth as far as 2011. However, it is facing ongoing skills shortages in a number of professional areas and tends to lack an ethnic diversity of workers compared to the White community of workers across the whole economy. The government’s Ethnic Minority Employment Task Force shows that for any given level of qualification, a Black or ethnic minority person is less likely to be employed, than a similarly qualified White person. Current research into issues surrounding ethnicity, from academia to employment is scarce, particularly in entry and process development within the construction industry. The aim of this paper is to outline the findings from perceptional and experiential barriers of Black and Minority Ethnics (BMEs students and employees, in order to identify perceptional and actual barriers that lead to the under-representation of BMEs within the construction industry; and also to suggest how better knowledge flow mechanisms could lead to a more balanced development, particularly in terms of ethnic diversification in the UK construction industry. The aim was achieved by adopting qualitative and quantitative methods including questionnaire surveys of undergraduate students in a construction related program, employees working within the construction industry and interviews with company directors and human resource managers. The image of the construction industry is found to be one of the major barriers for entry into the industry. Language and cultures form additional barriers for a range of ethnic groupings. Support, in the form of recruitment events, training, mentoring, professional networking, as well as work placement and experience schemes, can smooth entry, retention and progression within the construction industry.

  2. Studies for site preparation for ITER construction

    International Nuclear Information System (INIS)

    Fardeau, A.; Blanc, F.; Cardettini, J.D.; Mandine, J.R.; Guerin, R.; Patisson, L.; Bergegere, P.; Santagiustina, A.; Garin, P.

    2004-01-01

    The implantation of a nuclear facility such as ITER (about 20 buildings on 40 ha) requires many preparatory studies, particularly with respect to: Underground characteristics; Topography, layout; Deforestation, excavations; Networks, fences and roads; Impact of seismic hazard on design. This paper presents the main results of these studies, carried out within the European ITER Site Studies framework. A dedicated paper in the conference deals with the transport studies. To choose the site for ITER implantation, detailed geological, hydrogeological and geophysical investigations have been carried out. Taking into account the meteorological data (particularly the main wind direction), topography, access, electrical supply, fluids needs and constraints (gravity systems), buildings and roads have been implemented. (authors)

  3. The disposal of solid radioactive wastes to land sites in the UK

    International Nuclear Information System (INIS)

    Ginniff, M.E.; Phillipson, D.L.

    1984-01-01

    Solid radioactive waste management by land disposal, using a strategy laid down by the government, is discussed. Waste disposal at Drigg, and the proposals for the two preferred sites at Elstow (shallow burial) and Billingham (deep burial) are outlined. Nuclear Industry Radioactive Waste Executive (NIREX); safety; public acceptance; and the role of the private sector; are also described. (U.K.)

  4. Management of construction safety at KKNPP site

    International Nuclear Information System (INIS)

    Khare, P.K.

    2016-01-01

    Construction is considered as one of the most hazardous activities owing to the number of accidents and injuries. At KKNPP, management of industrial safety has been envisaged since the preliminary stage of construction planning, including design aspects. The governing principles of safety management are evolved from the Factories Act, 1948, the Atomic Energy(Factories) Rules, 1996, AERB safety guidelines on Control of works (2011) and Corporate HSE policy of NPCIL (2014). Numerous risk assessment and hazard control measures are adopted consistently to ensure a safe work environment during the construction, which includes Job Hazard Analysis, work permit through Computerized Maintenance Management System, safety procedures, exclusive safety training facility for the contractor's workmen, safety motivational measures, safety surveillance and reporting through Safety Related Deficiencies Management System. Assessment of efficacy of safety management system is continuously done through safety audits and observations are being circulated and discussed in committee meetings. Fire safety is also being taken care of since inception of project work. Well-equipped fire station with trained fire fighters was made available since the beginning as per AERB safety standard on fire protection system for Nuclear facilities. Fire prevention measures specific to the work are implemented during all activities. (author)

  5. Quality assurance during site construction. Pt. 4

    International Nuclear Information System (INIS)

    Potrz, R.; Dilling, H.

    1980-01-01

    Quality control during the assembly of an pressure water reactor containment: 1.) Fundamental principles of the quality control: short explanation to the specification and job instruction. 2.) Quality control during the assembly: welding control, non destructive material test. 3.) Quality deviations: explanation of an repair-plan. 4.) Documentation: join together the workshop- and site documentation. (orig.)

  6. Radioactive waste disposal at Sellafield, UK: site selection, geological and engineering problems

    International Nuclear Information System (INIS)

    Haszeldine, R.S.; Smythe, D.K.

    1996-01-01

    UK Nirex is the company charged with finding a suitable site for the underground disposal of radioactive waste in the United Kingdom. Since 1991, Nirex has concentrated its investigation work at a site owned by British Nuclear Fuels Ltd near Sellafield. Planning permission was sought in 1994 for the development of an underground Rock Characterisation Facility at the site. A public Planning Inquiry began in September 1995. A wide range of scientific and technical objections were put by expert witnesses against the Nirex proposal. These witnesses were co-ordinated by three Objecting Organisations - Cumbria County Council, Friends of the Earth and Greenpeace. Their written evidence is presented in the 34 chapters of this book and separate abstracts have been written for each contribution. (UK)

  7. Quantifying Construction Site Sediment Discharge Risk and Treatment Potential

    Science.gov (United States)

    Ferrell, L.; Beighley, R. E.

    2006-12-01

    Dealing with soil erosion and sediment transport can be a significant challenge during the construction process due to the potentially large spatial and temporal extent and conditions of bare soils. Best Management Practices (BMP) are commonly used to eliminate or reduce offsite discharge of sediment. However, few efforts have investigated the time varying risk of sediment discharge from construction sites, which often have dynamic soil conditions and the potential for less than optimal BMP installations. The goal of this research is to improve the design, implementation and effectiveness of sediment and erosion control at construction sites using site specific, temporal distributions of sediment discharge risk. Sediment risk is determined from individual factors leading to sediment expert, such as rainfall frequency, the adequacy of BMP installations, and the extent and duration of bare soil conditions. This research specifically focuses on quantifying: (a) the effectiveness of temporary sediment and control erosion control BMPs in preventing, containing, and/or treating construction site sediment discharge at varying levels of "proper" installation, and (b) sediment discharge potential from construction sites during different phases of construction, (ex., disturbed earth operations). BMPs are evaluated at selected construction sites in southern California and at the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with soil depths up to 1 meter, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, potential less than optimal installations, and no treatment conditions. Soil conditions are also varied to represent site conditions during different phases of construction (i.e., loose lifts

  8. Occupation and work-related ill-health in UK construction workers.

    Science.gov (United States)

    Stocks, S J; Turner, S; McNamee, R; Carder, M; Hussey, L; Agius, R M

    2011-09-01

    Construction workers are at increased risk of work-related ill-health (WRI) worldwide. To compare the incidence of medically reported WRI in occupations within the UK construction industry according to job title. We calculated standardized incidence rate ratios (SRRs) using WRI cases for individual job titles returned to The Health and Occupation Reporting network by clinical specialists and UK population denominators. We counted frequencies of reported causal exposures or tasks reported by clinical specialists, occupational physicians and general practitioners. We found significantly increased incidence of WRI compared with other workers in the same major Standard Occupational Classification, i.e. workers with similar levels of qualifications, training, skills and experience, for skin neoplasia in roofers (SRR 6.3; 95% CI: 3.1-13.1), painters and decorators (2.1; 95% CI: 1.2-3.6) and labourers in building and woodworking trades (labourers, 6.6; 95% CI: 3.2-13.2); contact dermatitis in metal workers (1.4; 95% CI: 1.1-1.7) and labourers (1.6; 95% CI: 1.1-2.3); asthma in welders (3.8; 95% CI: 2.8-5.0); musculoskeletal disorders in welders (1.7; 95% CI: 1.1-2.8), road construction operatives (6.1; 95% CI: 3.8-9.6) and labourers (2.5; 95% CI: 1.7-3.7); long latency respiratory disease (mesothelioma, pneumoconiosis, lung cancer, non-malignant pleural disease) in pipe fitters (4.5; 95% CI: 3.2-6.2), electrical workers (2.7; 95% CI: 2.4-3.2), plumbing and heating engineers (2.3; 95% CI: 1.9-2.7), carpenters and joiners (2.7; 95% CI: 2.3-3.1), scaffolders (12; 95% CI: 8-18) and labourers (3.3; 95% CI: 2.6-4.1). UK construction industry workers have significantly increased risk of WRI. These data in individual construction occupations can be used to inform appropriate targeting of occupational health resources.

  9. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  10. Safety leadership: application in construction site.

    Science.gov (United States)

    Cooper, Dominic

    2010-01-01

    The extant safety literature suggests that managerial Safety Leadership is vital to the success and maintenance of a behavioral safety process. The current paper explores the role of Managerial Safety Leadership behaviors in the success of a behavioral safety intervention in the Middle-East with 47,000 workers from multiple nationalities employed by fourteen sub-contractors and one main contractor. A quasi-experimental repeating ABABAB, within groups design was used. Measurement focused on managerial Safety Leadership and employee safety behaviors as well as Corrective Actions. Data was collected over 104 weeks. During this time, results show safety behavior improved by 30 percentage points from an average of 65% during baseline to an average of 95%. The site achieved 121 million man-hours free of lost-time injuries on the longest run. Stepwise multiple regression analyses indicated 86% of the variation in employee safety behavior was associated with senior, middle and front-line manager's Safety Leadership behaviors and the Corrective Action Rate. Approximately 38% of the variation in the Total Recordable Incident Rate (TRIR) was associated with the Observation rate, Corrective Action Rate and Observers Records of managerial safety leaders (Visible Ongoing Support). The results strongly suggest manager's Safety Leadership influences the success of Behavioral Safety processes.

  11. Survey dataset on occupational hazards on construction sites

    Directory of Open Access Journals (Sweden)

    Patience F. Tunji-Olayeni

    2018-06-01

    Full Text Available The construction site provides an unfriendly working conditions, exposing workers to one of the harshest environments at a workplace. In this dataset, a structured questionnaire was design directed to thirty-five (35 craftsmen selected through a purposive sampling technique on various construction sites in one of the most populous cities in sub-Saharan Africa. The set of descriptive statistics is presented with tables, stacked bar chats and pie charts. Common occupational health conditions affecting the cardiovascular, respiratory and musculoskeletal systems of craftsmen on construction sites were identified. The effects of occupational health hazards on craftsmen and on construction project performance can be determined when the data is analyzed. Moreover, contractors’ commitment to occupational health and safety (OHS can be obtained from the analysis of the survey data. Keywords: Accidents, Construction industry, Craftsmen, Health, Occupational hazards

  12. Pattern of accidents in building construction sites in Obio Akpor ...

    African Journals Online (AJOL)

    Background: Building construction workers are engaged in a dangerous job, exposing them ... The leading cause building site accidents include falls from unsafe working ... Data collected in Excel spread sheet were analyzed and presented in ...

  13. Investigation of the site selection examples adopted local participation. The site selection processes in Belgium, UK and Switzerland

    International Nuclear Information System (INIS)

    Kageyama, Hitoshi; Suzuki, Shinji; Hirose, Ikuro; Yoshioka, Tatsuji

    2014-06-01

    In late years, local participation policies are being adopted in foreign countries at site selection for the disposal of the radioactive waste. We performed documents investigation about the examples of the site selection processes of Belgium, the U.K., and Switzerland to establish the site selection policy in Japan. In Belgium, after the failure of the site selection for the disposal of short-lived low and intermediate level radioactive waste (LILW) in an early stage, the idea of the local partnership (LP) was developed and three independent LPs were established between the implementing body and each municipality. About 7 years later, one site was decided as the disposal site in the cabinet meeting of the federal government. In the U.K., after the failure of the site selection for the rock characterization facility, the government policy was changed and the consultation process comprised of six phases was started. Though the process had been carried out for over 4 years since one combined partnership was established between the implementing body and the municipalities involved, they had to withdraw from the consulting process because a county council had not accepted that the process would step forward to the 4th phase. In Switzerland, the implementing body selected one site for LILW disposal at an early stage, but the project was denied by the referendum in the Canton having jurisdiction over the site area. After that the Federal Parliament established new Nuclear Energy Act and Nuclear Energy Ordinance precluding the veto of Canton. Now the site selection project is being carried out according to the process comprised of three phases with local participation policy. Reviewing the merits and demerits of each example through this investigation, we confirmed if we are to adopt local participation policy in our country in future, further prudent study would be necessary, considering current and future social conditions in Japan. (author)

  14. Site characterization for hybrid system construction

    Energy Technology Data Exchange (ETDEWEB)

    Saldana, R.; Miranda, U.; Medrano, M. C. [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    The basic reason to use alternative systems for electricity generation, in most cases, is the lack of electricity services, such as isolated rural communities which are located far away from the electric distribution line, and the cost of its extension is too expensive, while decentralized power systems can be an economic and appropriate solution to providing these services. Up to now there are several technological options for rural electrification using PV modules, wind plants, water-power plants, anaerobic digesters, or a combination of some of them, according to the availability of energetic resources. The applications include centralized or decentralized systems, autonomous or hybrid systems, isolated or interconnected to the electric line, etc. A particular hybrid system design can be done considering two general aspects, first it is necessary to know the electric consumption that will be supplied, taking into account present and future necessities and how local energetic resources are present in a selected site. Finally, also it is necessary to carry out an economic analysis to determine the cost of kilowatt-hour generated using local energetic resources and compare it with the cost of electricity produced by conventional power systems. [Espanol] La razon principal para el uso de sistemas alternativos de generacion de electricidad, en la mayoria de los casos, es la falta de servicios de electricidad, tal como en las comunidades rurales aisladas localizadas lejos de linea de distribucion electrica, donde el costo de su extension es demasiado caro, mientras que los sistemas descentralizados de energia pueden ser una solucion economica y adecuada para proporcionar estos servicios. Hasta ahora existen varias opciones tecnologicas para la electrificacion rural usando modulos fotovoltaicos, aerogeneradores, plantas hidroelectricas, digestores anaerobicos o una combinacion de algunos de ellos, de acuerdo con la disponibilidad de los recursos energeticos. Las

  15. Site characterization for hybrid system construction

    Energy Technology Data Exchange (ETDEWEB)

    Saldana, R; Miranda, U; Medrano, M C [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    The basic reason to use alternative systems for electricity generation, in most cases, is the lack of electricity services, such as isolated rural communities which are located far away from the electric distribution line, and the cost of its extension is too expensive, while decentralized power systems can be an economic and appropriate solution to providing these services. Up to now there are several technological options for rural electrification using PV modules, wind plants, water-power plants, anaerobic digesters, or a combination of some of them, according to the availability of energetic resources. The applications include centralized or decentralized systems, autonomous or hybrid systems, isolated or interconnected to the electric line, etc. A particular hybrid system design can be done considering two general aspects, first it is necessary to know the electric consumption that will be supplied, taking into account present and future necessities and how local energetic resources are present in a selected site. Finally, also it is necessary to carry out an economic analysis to determine the cost of kilowatt-hour generated using local energetic resources and compare it with the cost of electricity produced by conventional power systems. [Espanol] La razon principal para el uso de sistemas alternativos de generacion de electricidad, en la mayoria de los casos, es la falta de servicios de electricidad, tal como en las comunidades rurales aisladas localizadas lejos de linea de distribucion electrica, donde el costo de su extension es demasiado caro, mientras que los sistemas descentralizados de energia pueden ser una solucion economica y adecuada para proporcionar estos servicios. Hasta ahora existen varias opciones tecnologicas para la electrificacion rural usando modulos fotovoltaicos, aerogeneradores, plantas hidroelectricas, digestores anaerobicos o una combinacion de algunos de ellos, de acuerdo con la disponibilidad de los recursos energeticos. Las

  16. A Review of the Case of a Levy-Grant Scheme (LGS) in the UK Construction Industry

    Science.gov (United States)

    Abdel-Wahab, Mohamed; Dainty, Andrew; Ison, Stephen

    2010-01-01

    A Levy-Grant Scheme (LGS) has existed in the UK construction industry since 1964 to provide financial support for companies undertaking training activities. Despite the support of the LGS for various training activities, notably apprenticeships, the construction industry continues to suffer from both labour shortages and an under-investment in…

  17. Effects of organizational complexity and resources on construction site risk.

    Science.gov (United States)

    Forteza, Francisco J; Carretero-Gómez, Jose M; Sesé, Albert

    2017-09-01

    Our research is aimed at studying the relationship between risk level and organizational complexity and resources on constructions sites. Our general hypothesis is that site complexity increases risk, whereas more resources of the structure decrease risk. A Structural Equation Model (SEM) approach was adopted to validate our theoretical model. To develop our study, 957 building sites in Spain were visited and assessed in 2003-2009. All needed data were obtained using a specific tool developed by the authors to assess site risk, structure and resources (Construction Sites Risk Assessment Tool, or CONSRAT). This tool operationalizes the variables to fit our model, specifically, via a site risk index (SRI) and 10 organizational variables. Our random sample is composed largely of small building sites with general high levels of risk, moderate complexity, and low resources on site. The model obtained adequate fit, and results showed empirical evidence that the factors of complexity and resources can be considered predictors of site risk level. Consequently, these results can help companies, managers of construction and regulators to identify which organizational aspects should be improved to prevent risks on sites and consequently accidents. Copyright © 2017 National Safety Council and Elsevier Ltd. All rights reserved.

  18. Mapping site-based construction workers’ motivation: Expectancy theory approach

    Directory of Open Access Journals (Sweden)

    Parviz Ghoddousi

    2014-03-01

    Full Text Available The aim of this study is to apply a recently proposed model of motivation based on expectancy theory to site-based workers in the construction context and confirm the validity of this model for the construction industry. The study drew upon data from 194 site-based construction workers in Iran to test the proposed model of motivation. To this end, the structural equation modelling (SEM approach based on the confirmatory factor analysis (CFA technique was deployed. The study reveals that the proposed model of expectancy theory incorporating five indicators (i.e. intrinsic instrumentality, extrinsic instrumentality, intrinsic valence, extrinsic valence and expectancy is able to map the process of construction workers’ motivation. Nonetheless, the findings posit that intrinsic indicators could be more effective than extrinsic ones. This proffers the necessity of construction managers placing further focus on intrinsic motivators to motivate workers. 

  19. Mapping site-based construction workers’ motivation: Expectancy theory approach

    Directory of Open Access Journals (Sweden)

    Parviz Ghoddousi

    2014-03-01

    Full Text Available The aim of this study is to apply a recently proposed model of motivation based on expectancy theory to site-based workers in the construction context and confirm the validity of this model for the construction industry. The study drew upon data from 194 site-based construction workers in Iran to test the proposed model of motivation. To this end, the structural equation modelling (SEM approach based on the confirmatory factor analysis (CFA technique was deployed. The study reveals that the proposed model of expectancy theory incorporating five indicators (i.e. intrinsic instrumentality, extrinsic instrumentality, intrinsic valence, extrinsic valence and expectancy is able to map the process of construction workers’ motivation. Nonetheless, the findings posit that intrinsic indicators could be more effective than extrinsic ones. This proffers the necessity of construction managers placing further focus on intrinsic motivators to motivate workers.

  20. Accident Causal Factors on the Building Construction Sites: A Review

    Directory of Open Access Journals (Sweden)

    Opeyemi Samuel Williams

    2018-01-01

    Full Text Available The concerns for cost, quality and timely delivery of projects have been in existence from time immemorial, whereas the passion for these should be extended to safe execution of site works by the construction participants, as safety of life is very paramount. However, high level of commitment that is essential for the safe execution of site works has become a taboo. Hence, a plethora of accidents takes place on the site ranging from falls from height, contact with working tools, vehicle-related, slip and trip, collapse, exposure to harmful substances, to lifting and handling object accidents. It is pertinent to know that, responsibility for accidents on site cuts across all project participants (clients, consultants, contractors, workers, as well as the construction site environment. Recognition of the construction participants and site environmental factors as agents of accident is the focus of this research. Through extensive review of literature, a copious number of factors were identified and subsequently grouped under five factors as client-related, consultant-related, contractor-related, construction workers-related, and construction site-related. However, there has been a dearth of research in the grouping of accident contributing factors. The identification and understanding of these factors will go a long way in mitigating construction accidents, coupled with proven measures taken in positively addressing them. Efforts to prevent these causative factors include inter alia elimination of hazards from design, effective safety management, adequate planning of activities and employment of seasoned professionals by the client. The contractors are to embark on staff safety auditing, set up safety committees, conduct regular training for staff, use innovative technology, uphold housekeeping and report accident occurrence, while strict adherence to safety regulations must be adopted by all construction operatives.

  1. Nucleic acid constructs containing orthogonal site selective recombinases (OSSRs)

    Energy Technology Data Exchange (ETDEWEB)

    Gilmore, Joshua M.; Anderson, J. Christopher; Dueber, John E.

    2017-08-29

    The present invention provides for a recombinant nucleic acid comprising a nucleotide sequence comprising a plurality of constructs, wherein each construct independently comprises a nucleotide sequence of interest flanked by a pair of recombinase recognition sequences. Each pair of recombinase recognition sequences is recognized by a distinct recombinase. Optionally, each construct can, independently, further comprise one or more genes encoding a recombinase capable of recognizing the pair of recombinase recognition sequences of the construct. The recombinase can be an orthogonal (non-cross reacting), site-selective recombinase (OSSR).

  2. Objective and subjective assessment of tonal components in noise from UK wind farm sites

    International Nuclear Information System (INIS)

    McKenzie, A.R.

    1997-01-01

    The level of any tonal components in the noise from a wind farm site can be quantified using objective analysis procedures. These procedures are, however, open to a certain amount of interpretation. an automated assessment procedure has, therefore, been developed which is appropriate to the needs of the wind turbine industry. This paper describes a study to compare the results of objective assessments carried out using this method with the results of carefully controlled subjective listening tests for samples of wind turbine noise from nine U.K. wind farm sites. (author)

  3. Cast iron transport, storage and disposal containers for use in UK nuclear licensed sites - 59412

    International Nuclear Information System (INIS)

    Viermann, Joerg; Messer, Matthias P.

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Ductile Cast Iron Containers of the types GCVI (UK trademark -GNS YELLOW BOX R ) and MOSAIK R have been in use in Germany for transport, storage and disposal of intermediate level radioactive waste (ILW) for more than two decades. In 2009 a number of containers of these types were delivered to various Magnox sites as so called pathfinders to test their suitability for Magnox waste streams. The results were encouraging. Therefore the Letter of Compliance (LoC) procedure was started to prove the suitability of packages using these types of containers for the future UK Geological Disposal Facility (GDF) and a conceptual Letter of Compliance (cLoC) was obtained from RWMD in 2010. Waste stream specific applications for Interim Stage Letters of Compliance (ILoC) for a number of waste streams from different Magnox sites and from the UK's only pressurised water reactor, Sizewell B are currently being prepared and discussed with RWMD. In order to achieve a package suitable for interim storage and disposal the contents of a Ductile Cast Iron Container only has to be dried. Mobile drying facilities are readily available. Containers and drying facilities form a concerted system

  4. UK safety and standards for radioactive waste management and decommissioning on nuclear licensed sites

    International Nuclear Information System (INIS)

    Mason, D.J.

    2001-01-01

    This paper discusses the regulation of radioactive waste and decommissioning in the United Kingdom and identifies the factors considered by HM Nuclear Installations Inspectorate in examining the adequacy arrangements for their management on nuclear licensed sites. The principal requirements are for decommissioning to be undertaken as soon as reasonably practicable and that radioactive wastes should be minimised, disposed of or contained and controlled by storage in a passively safe form. However, these requirements have to be considered in the context of major organisational changes in the UK nuclear industry and the non-availability of disposal routes for some decommissioning wastes. The legislative framework used to regulate decommissioning of nuclear facilities in the UK is described. Reference is made to radioactive waste and decommissioning strategies, quinquennial reviews criteria for delicensing and the forthcoming Environmental Impact Assessment Regulations. (author)

  5. Mechanisation and automation technologies development in work at construction sites

    Science.gov (United States)

    Sobotka, A.; Pacewicz, K.

    2017-10-01

    Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.

  6. Construction Site Workers’ Awareness on Using Safety Equipment: Case Study

    Directory of Open Access Journals (Sweden)

    Ulang N. Md

    2014-01-01

    Full Text Available Construction sector is an important sector and contributed significantly to national development. However, this sector poses higher risk to accident. This is due to fact that construction site can be considered as a dangerous zone to workers and to the public. Due to the variety of cases occurs on site, the contractor will usually have to pay the cost related to accidents in the form of higher insurance premium. Despite various measures, accidents still occur at construction sites. Personal Protective Equipment (PPE is one of the important means to protect the wearer from hazards in the workplace. Since this equipment is the last frontier of the wearer from worksite hazards, it is important to select it based on the job scope and the intended protection. Therefore, this study was formulated to find out the level of knowledge and awareness of construction workers on PPE usage. It was also important to know what make the workers would want or do not want to use the PPE. It was found in this study that the level of awareness and knowledge among workers on the proper use of PPE is moderate. Construction sites accident can be further be reduced with proper implementation of PPE voluntarily by all workers.

  7. Greenhouse Gas Emissions from Excavation on Residential Construction Sites

    Directory of Open Access Journals (Sweden)

    Perry Forsythe

    2014-12-01

    Full Text Available Despite considerable research concerning the manifestation of greenhouse gases in the usage of buildings, little has been done concerning emissions arising from the construction process itself. This paper specifically examines emissions arising from cut and fill excavation on residential construction sites. Even though such excavation is often seen as being economical in terms of providing a flat base for concrete raft slab construction, the environmental consequences of this approach need to be considered more fully in terms of impact on the environment. This is particularly important when steeply sloping sites are involved and for different soil types. The paper undertakes a study that quantitatively assesses the cumulative greenhouse gas emissions caused by cut and fill excavation on 52 residential projects in Australia for a range of slope and soil types. The paper presents results from the study and concludes that greenhouse gas emissions increase as site slope increases; the building footprint area (as distinct from Gross Floor Area, exposes the need to reduce the area of the building to reduce greenhouse gas emissions; excavation of rock soils creates higher emissions than other soil types; and cut and fill excavation on steeply slope sites increase emissions. Potential alternative construction includes suspended floor construction systems which involve less excavation.

  8. Greenhouse Gas Emissions from Excavation on Residential Construction Sites

    Directory of Open Access Journals (Sweden)

    Perry Forsythe

    2014-12-01

    Full Text Available Despite considerable research concerning the manifestation of greenhouse gases in the usage of buildings, little has been done concerning emissions arising from the construction process itself. This paper specifically examines emissions arising from cut and fill excavation on residential construction sites. Even though such excavation is often seen as being economical in terms of providing a flat base for concrete raft slab construction, the environmental consequences of this approach need to be considered more fully in terms of impact on the environment. This is particularly important when steeply sloping sites are involved and for different soil types. The paper undertakes a study that quantitatively assesses the cumulative greenhouse gas emissions caused by cut and fill excavation on 52 residential projects in Australia for a range of slope and soil types. The paper presents results from the study and concludes that greenhouse gas emissions increase as site slope increases; the building footprint area (as distinct from Gross Floor Area, exposes the need to reduce the area of the building to reduce greenhouse gas emissions; excavation of rock soils creates higher emissions than other soil types; and cut and fill excavation on steeply slope sites increase emissions. Potential alternative construction includes suspended floor construction systems which involve less excavation. 

  9. Event-based soil loss models for construction sites

    Science.gov (United States)

    Trenouth, William R.; Gharabaghi, Bahram

    2015-05-01

    The elevated rates of soil erosion stemming from land clearing and grading activities during urban development, can result in excessive amounts of eroded sediments entering waterways and causing harm to the biota living therein. However, construction site event-based soil loss simulations - required for reliable design of erosion and sediment controls - are one of the most uncertain types of hydrologic models. This study presents models with improved degree of accuracy to advance the design of erosion and sediment controls for construction sites. The new models are developed using multiple linear regression (MLR) on event-based permutations of the Universal Soil Loss Equation (USLE) and artificial neural networks (ANN). These models were developed using surface runoff monitoring datasets obtained from three sites - Greensborough, Cookstown, and Alcona - in Ontario and datasets mined from the literature for three additional sites - Treynor, Iowa, Coshocton, Ohio and Cordoba, Spain. The predictive MLR and ANN models can serve as both diagnostic and design tools for the effective sizing of erosion and sediment controls on active construction sites, and can be used for dynamic scenario forecasting when considering rapidly changing land use conditions during various phases of construction.

  10. Causes of Fall Hazards in Construction Site Management

    OpenAIRE

    Liy, Chong Hui; Ibrahim, Siti Halipah; Affandi, Rohaida; Rosli, Nor Azalina; Nawi, Mohd Nasrun Mohd

    2016-01-01

    Statistics from Occupational Safety and Health Act 1994 has shown that the number of fatality in the construction industry is 5 times more than in other sectors. The total fatalities in construction are 796 in year 2013 and out of this 796, there were 294 fall fatalities. Hence, there is an urgent need to mitigate this problem. A study has been conducted to investigate the root causes of fall hazards in construction site. Therefore, this paper is intended to identify and highlights the types ...

  11. Construct Validity of the WISC-IV[superscript UK] with a Large Referred Irish Sample

    Science.gov (United States)

    Watkins, Marley W.; Canivez, Gary L.; James, Trevor; James, Kate; Good, Rebecca

    2013-01-01

    Irish educational psychologists frequently use the Wechsler Intelligence Scale for Children-Fourth U.K. Edition (WISC-IV[superscript UK]) in clinical assessments of children with learning difficulties. Unfortunately, reliability and validity studies of the WISC-IV[superscript UK] have not yet been reported. This study examined the construct…

  12. Effectiveness of Practicing Supply Chain Management in Construction Site

    Directory of Open Access Journals (Sweden)

    Mamter S.

    2014-01-01

    Full Text Available Construction Supply chain management comprised of the network of organization involved in the different processes and activities which produce the material, components and services that come together to design, procurement and deliver a building. It also consists of different organizations involved in the construction process including client/owner, designer, contractor, subcontractor and suppliers. This paper shall present on the implementation of supply chain management in construction and the effectiveness of practicing SCM in construction site. A field study is done from the viewpoint of contractor and consultant then analysed by using average index methods and presented in a statistical analysis. From the analysis, it reveals that effectiveness of practicing the SCM give a lot of good performances and granted benefits to contractor. The statistical analysis produced first ranking effectiveness of SCM is can minimize waste of material and labor for construction project.

  13. Solar radiation measurements at the network of six sites in the UK, January - December 2001

    Energy Technology Data Exchange (ETDEWEB)

    Driscoll, C.M.H.; Campbell, J.I.; Pearson, A.J.; Grainger, K.J.L.; Dean, S.F.; Clark, I.E

    2002-04-01

    A summary of the results from January to December 2001 of a survey of solar radiation levels at the UK network of six solar radiation measurement sites is presented. The network consists of three NRPB sites at Chilton, Leeds and (monitoring since 1988) and three Meteorological Office stations at Camborne, Kinloss and Lerwick (monitoring since 1993). Visible (400-770 nm), ultraviolet UVA radiation (320-400 nm) and erythemally weighted ultraviolet radiation UVR{sub eff} (280-400 nm) have been measured simultaneously using a three detector measurement system. Results are compared with calculated irradiances of ultraviolet radiation and published illuminance data, and with data for the measurement period from 1988 to 2000. Yearly reports have been produced for selected sites, giving the daily solar index (which is a measure of the sunburn potential for sensitive skin types) throughout the year. (author)

  14. Solar radiation measurements at the network of six sites in the UK, January - December 2001

    International Nuclear Information System (INIS)

    Driscoll, C.M.H.; Campbell, J.I.; Pearson, A.J.; Grainger, K.J.L.; Dean, S.F.; Clark, I.E.

    2002-01-01

    A summary of the results from January to December 2001 of a survey of solar radiation levels at the UK network of six solar radiation measurement sites is presented. The network consists of three NRPB sites at Chilton, Leeds and (monitoring since 1988) and three Meteorological Office stations at Camborne, Kinloss and Lerwick (monitoring since 1993). Visible (400-770 nm), ultraviolet UVA radiation (320-400 nm) and erythemally weighted ultraviolet radiation UVR eff (280-400 nm) have been measured simultaneously using a three detector measurement system. Results are compared with calculated irradiances of ultraviolet radiation and published illuminance data, and with data for the measurement period from 1988 to 2000. Yearly reports have been produced for selected sites, giving the daily solar index (which is a measure of the sunburn potential for sensitive skin types) throughout the year. (author)

  15. A novel methodology to estimate the evolution of construction waste in construction sites.

    Science.gov (United States)

    Katz, Amnon; Baum, Hadassa

    2011-02-01

    This paper focuses on the accumulation of construction waste generated throughout the erection of new residential buildings. A special methodology was developed in order to provide a model that will predict the flow of construction waste. The amount of waste and its constituents, produced on 10 relatively large construction sites (7000-32,000 m(2) of built area) was monitored periodically for a limited time. A model that predicts the accumulation of construction waste was developed based on these field observations. According to the model, waste accumulates in an exponential manner, i.e. smaller amounts are generated during the early stages of construction and increasing amounts are generated towards the end of the project. The total amount of waste from these sites was estimated at 0.2m(3) per 1m(2) floor area. A good correlation was found between the model predictions and actual data from the field survey. Copyright © 2010 Elsevier Ltd. All rights reserved.

  16. Problematising the `Career Academic' in UK construction and engineering education: does the system want what the system gets?

    Science.gov (United States)

    Pilcher, Nick; Forster, Alan; Tennant, Stuart; Murray, Mike; Craig, Nigel

    2017-11-01

    'Career Academics' are principally research-led, entering academia with limited or no industrial or practical experience. UK Higher Education Institutions welcome them for their potential to attain research grant funding and publish world-leading journal papers, ultimately enhancing institutional reputation. This polemical paper problematises the Career Academic around three areas: their institutional appeal; their impact on the student experience, team dynamics and broader academic functions; and current strategic policy to employ them. We also argue that recent UK Government teaching-focused initiatives will not address needs to employ practical academics, or 'Pracademics' in predominantly vocational Construction and Engineering Education. We generate questions for policy-makers, institutions and those implementing strategy. We argue that research is key, but partial rebalancing will achieve a diverse academic skill base to achieve contextualised construction and engineering education. In wider European contexts, the paper resonates with issues of academic 'drift' and provides reflection for others on the UK context.

  17. UK guidance for assessing the impact of radioactive substances on wildlife inhabiting Natura 2000 sites

    International Nuclear Information System (INIS)

    Merrill, P.; Copplestone, D.; Zinger, I.; Allot, R.; Williams, C.

    2004-01-01

    The UK has a duty to comply with the EU Birds and Habitats Directives when planning and undertaking all of its regulatory and operational activities. These European Directives were introduced into UK legislation by the Conservation (Natural Habitats) Regulations 1994, as amended by the Conservation (Natural Habitats) (England) Regulations 2000. Under these Regulations, the Environment Agency has obligations in England and Wales to review all existing environmental licences to ensure that no Agency authorised activity results in an adverse effect, either directly or indirectly, on the integrity of identified European Sites. In this context European Sites consist of classified or Special Protection Areas (SPA) created under the Wild Birds Directive and candidate or designated Special Areas of Conservation (SAC) under the Habitats Directive. These sites are collectively referred to as Natura 2000 sites. Working in partnership with English Nature and the Countryside Council for Wales, who select Natura 2000 sites, the Agency has put in place a staged approach to the assessment of the impact of ionising radiation on the environment. - Stage 1: Identifying whether the Habitats Regulations are applicable. - Stage 2: Identifying whether authorisations to discharge radioactive substances present a potential risk of significant effect on wildlife and habitats. - Stage 3: Identifying issues to consider when carrying out a more detailed assessment of the potential impact of radioactive discharges for sites identified as presenting a potential risk. - Stage 4: Grant or deny authorisation for regulated discharge purposes, following Stage 3 Assessment. The developed methodology, described in R and D Publication 128 and presented at the IAEA Darwin Symposium in 2003, was used in screening authorisations (Stage 2), and is now needed by practitioners to carry out detailed impact assessments under Stage 3. The current paper will describe how the methodology was used to apply the

  18. Quality assurance during site construction of nuclear power plants

    International Nuclear Information System (INIS)

    1981-01-01

    This Safety Guide provides requirements and recommendations related to the establishment and implementation of a quality assurance programme for the site construction activities at nuclear power plants. These include activities such as fabricating, erecting, installing, handling, storing, cleaning, flushing, inspecting, testing, modifying, repairing, and maintaining

  19. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE ITER

    Science.gov (United States)

    In Fall 1994, anaerobic compost wetlands in both upflow and downflow configurations were constructed adjacent to and received drainage from the Burleigh Tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The e...

  20. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE TECHNOLOGY CAPSULE

    Science.gov (United States)

    In fall 1994, anaerobic compost wetlands in both upflow and down flow configurations were constructed adjacent to and received drainage from the Burleigh tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The ...

  1. Proposed genetic algorithms for construction site lay out

    NARCIS (Netherlands)

    Mawdesley, Michael J.; Al-Jibouri, Saad H.S.

    2003-01-01

    The positioning of temporary facilities on a construction site is an area of research which has been recognised as important but which has received relatively little attention. In this paper, a genetic algorithm is proposed to solve the problem in which m facilities are to be positioned to n

  2. Comparing the DSM-5 construct of Disruptive Mood Dysregulation Disorder and ICD-10 Mixed Disorder of Emotion and Conduct in the UK Longitudinal Assessment of Manic Symptoms (UK-LAMS) Study.

    Science.gov (United States)

    Sagar-Ouriaghli, I; Milavic, G; Barton, R; Heaney, N; Fiori, F; Lievesley, K; Singh, J; Santosh, Paramala

    2018-05-05

    It is important to understand new diagnostic entities in classifications of psychopathology such as the Diagnostic and Statistical Manual of Mental Disorders-5 (DSM-5) (code F34.8) construct of Disruptive Mood Dysregulation Disorder (DMDD) and to compare it with possible equivalent disorders in other classificatory systems such as the International Classification of Diseases-10 (ICD-10), which has a category that superficially appears similar, that is, Mixed Disorder of Emotion and Conduct (MDEC) (code F92). In this study, the United Kingdom (UK) arm (UK-LAMS) of the US National Institute of Mental Health (NIMH) supported Longitudinal Assessment of Manic Symptoms (LAMS) multi-site study was used to evaluate and retrospectively construct DMDD and MDEC diagnoses in order to compare them and understand the conditions they co-occur with, in order to improve the clinical understanding. In particular, the phenomenology of UK-LAMS participants (n = 117) was used to determine whether DMDD is a unique entity within the DSM-5. The findings showed that 24 of 68 participants with either DMDD or MDEC (35.3%) fulfilled both diagnostic criteria for DMDD and MDEC, suggesting that these entities do contain overlapping features, particularly symptoms relating to Oppositional Defiant Disorder (ODD)/Conduct Disorder (CD), Attention Deficit Hyperactivity Disorder (ADHD)/Hyperkinetic Disorder (HKD) and/or an anxiety disorder. The data also showed that most of the participants who met DMDD criteria also fulfilled the diagnostic criteria for ODD/CD, ADHD, followed by an anxiety disorder. In this context, this raises the issue whether DMDD is a unique construct or whether the symptomology for DMDD can be better explained as a specifier for ODD/CD and ADHD. Unlike DMDD, MDEC clearly specifies that the label should only be used if emotional and conduct disorders co-exist.

  3. Genetic algorithm optimization for dynamic construction site layout planning

    Directory of Open Access Journals (Sweden)

    Farmakis Panagiotis M.

    2018-02-01

    Full Text Available The dynamic construction site layout planning (DCSLP problem refers to the efficient placement and relocation of temporary construction facilities within a dynamically changing construction site environment considering the characteristics of facilities and work interrelationships, the shape and topography of the construction site, and the time-varying project needs. A multi-objective dynamic optimization model is developed for this problem that considers construction and relocation costs of facilities, transportation costs of resources moving from one facility to another or to workplaces, as well as safety and environmental considerations resulting from facilities’ operations and interconnections. The latter considerations are taken into account in the form of preferences or constraints regarding the proximity or remoteness of particular facilities to other facilities or work areas. The analysis of multiple project phases and the dynamic facility relocation from phase to phase highly increases the problem size, which, even in its static form, falls within the NP (for Nondeterministic Polynomial time- hard class of combinatorial optimization problems. For this reason, a genetic algorithm has been implemented for the solution due to its capability to robustly search within a large solution space. Several case studies and operational scenarios have been implemented through the Palisade’s Evolver software for model testing and evaluation. The results indi­cate satisfactory model response to time-varying input data in terms of solution quality and computation time. The model can provide decision support to site managers, allowing them to examine alternative scenarios and fine-tune optimal solutions according to their experience by introducing desirable preferences or constraints in the decision process.

  4. Insights into Architects’ Future Roles in Off-Site Construction

    Directory of Open Access Journals (Sweden)

    Jianing Luo

    2017-03-01

    Full Text Available Today’s construction industry is overflowing with new ideas about its future. Off-Site Manufacture and Construction (OSCM is at the heart of the modern construction industry. Much has been written about the state and context of OSCM in different countries regarding its perceived benefits and barriers to implementation. Off-site production (OSP plays an important role in improving fragmented construction processes. Although most OSP research targets the attitudes and practices of OSP adoption, there is limited understanding of the philosophical issues underpinning OSP-related architecture. The roles of the architects’ personal philosophies are neglected and this hampers their implementation of OSCM (which has had a largely technical focus. This paper explores the traditional thinking patterns of architects in China and predicts possible future roles for them. It then conceptualizes an “architectural work” mode and a “building product” mode of design and construction and identifies the shortcomings of architects in an OSCM environment. The arguments made are based on practitioners’ perceptions and the first author’s practical experiences of leading several real-life projects in recent years. The findings reveal the implications and significance of the transformation from an “architectural work” mode to a “building product” mode. We foresee a study approach that focuses on the order and rules for OSCM, resulting in architects’ existing mindsets being changed to thinking patterns and design methodologies better suited to OSCM.

  5. Constructing identities in the media: newspaper coverage analysis of a major UK Clostridium difficile outbreak.

    Science.gov (United States)

    Burnett, Emma; Johnston, Bridget; Corlett, Joanne; Kearney, Nora

    2014-07-01

    To examine how a major Clostridium difficile outbreak in the UK was represented in the media. Clostridium difficile is a serious health care-associated infection with significant global prevalence. As major outbreaks have continued to occur worldwide over the last few decades, it has also resulted in increasing media coverage. Newspaper journalists are, however, frequently criticized for sensationalized and inaccurate reporting and alarming the public. Despite such criticisms, nothing is known about how the media frame Clostridium difficile related coverage. Qualitative interpretive descriptive study. An interpretive analysis of newspaper articles from the national press that reported about the outbreak from the first day of coverage over 3 weeks (12 June-3 July 2008). Twenty-eight newspaper articles were included in the study from tabloids, broadsheets, a regional and a Sunday newspaper. Monster and war metaphors were frequently adopted to portray the severity of Clostridium difficile and the impact it can have on patient safety. In addition, the positioning of the affected patients, their families, healthcare professionals and the Government produced representations of victims, villains and heroes. This subsequently evoked notions of vulnerability, blame and conflict. The media are and will remain critical convectors of public information and, as such, are hugely influential in risk perceptions and responses. Rather than simply dismissing media coverage, further understanding around how such stories in specific contexts are constructed and represented is needed so that it can help inform future communication and management strategies. © 2013 John Wiley & Sons Ltd.

  6. Behavior-based safety on construction sites: a case study.

    Science.gov (United States)

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in

  7. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  8. Writing for the web composing, coding, and constructing web sites

    CERN Document Server

    Applen, JD

    2013-01-01

    Writing for the Web unites theory, technology, and practice to explore writing and hypertext for website creation. It integrates such key topics as XHTML/CSS coding, writing (prose) for the Web, the rhetorical needs of the audience, theories of hypertext, usability and architecture, and the basics of web site design and technology. Presenting information in digestible parts, this text enables students to write and construct realistic and manageable Web sites with a strong theoretical understanding of how online texts communicate to audiences. Key features of the book

  9. Knowledge Construction and Personal Relationship: Insights about a UK University Mentoring and Coaching Service

    Science.gov (United States)

    Hargreaves, Eleanore

    2010-01-01

    This article examines interview data from 12 mentors/coaches and eight of their clients in order to explore a mentoring and coaching service among UK university staff. Both mentors/coaches and clients were administrative or academic employees of the Institute of Education or affiliated colleges at London University, UK. Their roles related to the…

  10. Constructing a National Higher Education Brand for the UK: Positional Competition and Promised Capitals

    Science.gov (United States)

    Lomer, Sylvie; Papatsiba, Vassiliki; Naidoo, Rajani

    2018-01-01

    This article examines national branding of UK higher education, a strategic intent and action to collectively brand UK higher education with the aim to attract prospective international students, using a Bourdieusian approach to understanding promises of capitals. We trace its development between 1999 and 2014 through a sociological study, one of…

  11. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  12. Investigation and demonstration of turbidity reduction in stormwater runoff for Oklahoma highway construction sites : final report.

    Science.gov (United States)

    2013-12-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction industry to control the discharge of pollutants from the sites. The construction effluent guidelines or ELGs require construction sites to reduce the pollu...

  13. AUTOCAD IN THE OPERATIONAL MANAGEMENT OF THE CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Tsareva Marina Vladimirovna

    2016-04-01

    Full Text Available Operational management of the construction is usually based on information analysis systems, which are aimed at the monitoring of working schedule and volumes as consistent with predicated schedules. The result of such systems’ operation is traditional information graphics (diagrams, charts, etc., which provides idea on the current state of the construction site and deviations from the planned settings. The author considers the visualization technology of construction of objects using an image of the situation on the AutoCAD drawings, converted into an interactive format. The article focuses on imperfections of the existing technologies of information support of the managers. The creation of unified IT platform is offered on the basis of CAD for creating an integrated information storage and visualization of the environment using electronic drawings and diagrams. Using interactive methods it is possible to illustrate the condition of almost any part of the construction project using these drawings and diagrams. E-drawings contain the basic information resources - estimates, plans, sections, specifications, technology, construction, etc. necessary for the calculation of indicators. The author proved that implementation of visualization is most efficient in case of electronic drawings in 3D format.

  14. Time for a real shift to relations: appraisal of Social Network Analysis applications in the UK construction industry

    Directory of Open Access Journals (Sweden)

    Ximing Ruan

    2013-03-01

    Full Text Available The Social Network Analysis (SNA has been adopted in the UK construction management research and generated meaningful insights in analysing project management organisations from network perspectives. As an effective tool, social network analysis has been used to analyse information and knowledge flow between construction project teams which is considered as foundation for collaborative working and subsequently improving overall performance. Social network analysis is based on an assumption of the importance of relationships among interacting units. The social network perspective encompasses theories, models and applications that are expressed in terms of relational concepts or processes. Many believe, moreover, that the success or failure of organisations often depends on the patterning of their internal structure. This paper reviewed existing literatures on SNA applications in construction industry from three leading construction management journals.  From the review, the research proposed some advance in the application of SNA in the construction industry. 

  15. Time for a real shift to relations: appraisal of Social Network Analysis applications in the UK construction industry

    Directory of Open Access Journals (Sweden)

    Ximing Ruan

    2013-03-01

    Full Text Available The Social Network Analysis (SNA has been adopted in the UK construction management research and generated meaningful insights in analysing project management organisations from network perspectives. As an effective tool, social network analysis has been used to analyse information and knowledge flow between construction project teams which is considered as foundation for collaborative working and subsequently improving overall performance. Social network analysis is based on an assumption of the importance of relationships among interacting units. The social network perspective encompasses theories, models and applications that are expressed in terms of relational concepts or processes. Many believe, moreover, that the success or failure of organisations often depends on the patterning of their internal structure. This paper reviewed existing literatures on SNA applications in construction industry from three leading construction management journals.  From the review, the research proposed some advance in the application of SNA in the construction industry.

  16. Evolution of the Business Environment Surrounding the UK's Nuclear Site Cleanup Program

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Lees, P.M.; Wall, C.E.E.

    2006-01-01

    In April 2005 twenty civil nuclear sites in the United Kingdom became the responsibility of the Nuclear Decommissioning Authority (NDA), a new organization created by the British Government to manage the cleanup of these sites. As a key part of this transition, the NDA became the owner and manager of these sites, which formerly were owned by the site operators, British Nuclear Fuels Limited plc (BNFL) and the United Kingdom Atomic Energy Authority (UKAEA). This was one of the most significant events in the history of the United Kingdom's nuclear industry and represented a true sea change, affecting many aspects of life and business on and around these sites as well as nationally. The NDA's budget for the cleanup of the twenty sites and the management of the overall cleanup program is approximately pounds 2 Billion per annum, almost $4 Billion. It is important to note that approximately half of this amount is spent with the supply chains which serve the management and operations contractors, including pounds 500 million at Sellafield alone. Additionally, the site management and operations contractors receive most of the pounds 2 Billion through contracts between the NDA and the various site management companies. This represents a lot of government money moving through contracts between entities, which invokes procurement and contracting rules and regulations, that while not new, have not previously been this broadly applied to nuclear site cleanup activities throughout the UK. The current estimate for the total life cycle cleanup costs for all twenty civil nuclear sites is pounds 56 Billion, a figure that is likely to increase further. The first rules to mention are the European Union Procurement Guidelines, which are designed to help ensure that procurements involving government funds are conducted in an open, fair, and transparent environment. While it is difficult to argue with the intent of these rules, at least for now they are having a slowing down effect on

  17. Siting, design and construction of underground repositories for radioactive wastes

    International Nuclear Information System (INIS)

    1986-01-01

    The objectives of the Symposium were to provide a forum for exchange of information internationally on the various scientific, technological, engineering and safety bases for the siting, design and construction of underground repositories, and to highlight current important issues and identify possible approaches. Forty-nine papers were presented, covering general approaches and regulatory aspects, disposal in shallow ground and rock cavities, disposal in deep geological formations and safety assessments related to the subject of the Symposium. Separate abstracts were prepared for each of these papers

  18. Unique Construction and Social Experiences in Residential Remediation Sites - 13423

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Paul; Scarborough, Rebecca [Sevenson Environmental Services, Inc. 2749 Lockport Road, Niagara Falls, NY 14305 (United States)

    2013-07-01

    Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

  19. Pyramiding tumuli waste disposal site and method of construction thereof

    Science.gov (United States)

    Golden, Martin P.

    1989-01-01

    An improved waste disposal site for the above-ground disposal of low-level nuclear waste as disclosed herein. The disposal site is formed from at least three individual waste-containing tumuli, wherein each tumuli includes a central raised portion bordered by a sloping side portion. Two of the tumuli are constructed at ground level with adjoining side portions, and a third above-ground tumulus is constructed over the mutually adjoining side portions of the ground-level tumuli. Both the floor and the roof of each tumulus includes a layer of water-shedding material such as compacted clay, and the clay layer in the roofs of the two ground-level tumuli form the compacted clay layer of the floor of the third above-ground tumulus. Each tumulus further includes a shield wall, preferably formed from a solid array of low-level handleable nuclear wate packages. The provision of such a shield wall protects workers from potentially harmful radiation when higher-level, non-handleable packages of nuclear waste are stacked in the center of the tumulus.

  20. Unique Construction and Social Experiences in Residential Remediation Sites - 13423

    International Nuclear Information System (INIS)

    Jung, Paul; Scarborough, Rebecca

    2013-01-01

    Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

  1. UK and Italian EIA systems: A comparative study on management practice and performance in the construction industry

    International Nuclear Information System (INIS)

    Bassi, Andrea; Howard, Robert; Geneletti, Davide; Ferrari, Simone

    2012-01-01

    This study evaluates and contrasts the management practice and the performance that characterise Environmental Impact Assessments (EIA) in Italy and in the UK. The methodology relies on the investigation of six carefully selected case studies, critically reviewed by referring to EIA and project design information, as well as collecting the opinion of key project participants. The study focuses on the construction industry and on specific key sectors like infrastructure for transport and renewable energy and commercial and tourism development. A main term of reference for the analyses has been established by critically reviewing international literature so as to outline common good practice, requirements for the enhancement of sustainability principles and typically incurred drawbacks. The proposed approach enhances transfer of knowledge and of experiences between the analyzed contexts and allows the provision of guidelines for practitioners. Distinctive differences between the UK and the Italian EIA systems have been detected for pivotal phases and elements of EIA, like screening, scoping, analysis of alternatives and of potential impacts, definition of mitigation strategies, review, decision making, public participation and follow up. - Highlights: ► The Italian and the UK Environmental Impact Assessment systems are compared. ► The research is centred on the construction industry. ► Issues and shortcomings are analysed by investigating six case studies. ► Integration of EIA with sustainability principles is appraised. ► General guidelines are provided to assist practitioners in the two national contexts.

  2. UK and Italian EIA systems: A comparative study on management practice and performance in the construction industry

    Energy Technology Data Exchange (ETDEWEB)

    Bassi, Andrea, E-mail: ab395@bath.co.uk [University of Bath, Faculty of Engineering and Design, Claverton Down, Bath BA2 7AY (United Kingdom); Howard, Robert, E-mail: robhoward@constcom.demon.co.uk [Construction Communications, 8 Cotton& #x27; s Field, Dry Drayton, Cambridge CB23 8DG (United Kingdom); Geneletti, Davide, E-mail: davide.geneletti@ing.unitn.it [Sustainability Science Program, Harvard University, 79 JFK Street, Cambridge, MA 02138 (United States); Dept. of Civil and Environmental Engineering, University of Trento, Via Mesiano, 77 38123 Trento (Italy); Ferrari, Simone, E-mail: simone.ferrari@polimi.it [Dept. BEST, Building Environment Science and Technology, Politecnico di Milano, Via Bonardi, 3 20133 Milano (Italy)

    2012-04-15

    This study evaluates and contrasts the management practice and the performance that characterise Environmental Impact Assessments (EIA) in Italy and in the UK. The methodology relies on the investigation of six carefully selected case studies, critically reviewed by referring to EIA and project design information, as well as collecting the opinion of key project participants. The study focuses on the construction industry and on specific key sectors like infrastructure for transport and renewable energy and commercial and tourism development. A main term of reference for the analyses has been established by critically reviewing international literature so as to outline common good practice, requirements for the enhancement of sustainability principles and typically incurred drawbacks. The proposed approach enhances transfer of knowledge and of experiences between the analyzed contexts and allows the provision of guidelines for practitioners. Distinctive differences between the UK and the Italian EIA systems have been detected for pivotal phases and elements of EIA, like screening, scoping, analysis of alternatives and of potential impacts, definition of mitigation strategies, review, decision making, public participation and follow up. - Highlights: Black-Right-Pointing-Pointer The Italian and the UK Environmental Impact Assessment systems are compared. Black-Right-Pointing-Pointer The research is centred on the construction industry. Black-Right-Pointing-Pointer Issues and shortcomings are analysed by investigating six case studies. Black-Right-Pointing-Pointer Integration of EIA with sustainability principles is appraised. Black-Right-Pointing-Pointer General guidelines are provided to assist practitioners in the two national contexts.

  3. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    International Nuclear Information System (INIS)

    Yu, Ann T.W.; Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Highlights: ► A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. ► However, the reduction cannot be sustained. ► Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006–2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  4. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk [Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong); Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara [Department of Civil and Structural Engineering, Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong)

    2013-01-15

    Highlights: Black-Right-Pointing-Pointer A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. Black-Right-Pointing-Pointer However, the reduction cannot be sustained. Black-Right-Pointing-Pointer Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  5. Construction of Site Risk Model using Individual Unit Risk Model in a NPP Site

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Ho Gon; Han, Sang Hoon [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Since Fukushima accident, strong needs to estimate site risk has been increased to identify the possibility of re-occurrence of such a tremendous disaster and prevent such a disaster. Especially, in a site which has large fleet of nuclear power plants, reliable site risk assessment is very emergent to confirm the safety. In Korea, there are several nuclear power plant site which have more than 6 NPPs. In general, risk model of a NPP in terms of PSA is very complicated and furthermore, it is expected that the site risk model is more complex than that. In this paper, the method for constructing site risk model is proposed by using individual unit risk model. Procedure for the development of site damage (risk) model was proposed in the present paper. Since the site damage model is complicated in the sense of the scale of the system and dependency of the components of the system, conventional method may not be applicable in many side of the problem.

  6. Yucca Mountain Site Characterization Project exploratory studies facilities construction status

    International Nuclear Information System (INIS)

    Allan, J.N.; Leonard, T.M.

    1993-01-01

    This paper discusses the progress to date on the construction planning and development of the Yucca Mountain Site Characterization Project (YMP) Exploratory Studies Facilities (ESF). The purpose of the ESF is to determine early site suitability and to characterize the subsurface of the Yucca Mountain site to assess its suitability for a potential high level nuclear waste repository. The present ESF configuration concept is for two main ramps to be excavated by tunnel boring machines (TBM) from the surface to the Topopah Spring Member of the Paintbrush Tuff Formation. From the main ramps, slightly above Topopah Spring level, supplemental ramps will be penetrated to the Calico Hills formation below the potential repository. There will be exploratory development drifts driven on both levels with the Main Test Area being located on the Topopah Spring level, which is the level of the proposed repository. The Calico Hills formation lies below the Topopah Spring member and is expected to provide the main geo-hydrologic barrier between the potential repository and the underlying saturated zones in the Crater Flat Tuff

  7. The Social Construction of Young People within Education Policy: Evidence from the UK's Coalition Government

    Science.gov (United States)

    Brooks, Rachel

    2013-01-01

    Since assuming power in May 2010, the UK's Coalition government has devoted considerable energy to formulating its policies with respect to young people. Evidence of this can be found in "Positive for youth: a new approach to cross-government policy for young people aged 13-19", a policy text that outlines a wide range of measures to be…

  8. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong.

    Science.gov (United States)

    Yu, Ann T W; Poon, C S; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C&D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C&D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C&D waste. Copyright © 2012 Elsevier Ltd. All rights reserved.

  9. Safety management system during rock blasting at FRFCF construction site

    International Nuclear Information System (INIS)

    Vijayakumaran, C.; Kandasamy, S.; Satpathy, K.K.

    2016-01-01

    Blasting is an important activity during rock excavation to reach required depth for obtaining stability of the civil structure. For the construction of various Plant Buildings of Fast Reactor Fuel Cycle Facility (FRFCF), IGCAR at Kalpakkam, based on the geological survey it is required to reach a depth of 21.4 meters from existing ground level. This paper details about the procedures and precaution adopted during the rock blasting activities at FRFCF site. The volume of rock removed by blasting was 3 lakh cubic meters. The total number of blasting carried out was 304 using 105.73 tons of blasting material. The entire blasting work could be completed within 174 days without any incident. (author)

  10. Assessing the representativeness of monitoring data from an urban intersection site in Central London, UK

    Energy Technology Data Exchange (ETDEWEB)

    Scaperdas, A.; Colvile, R.N. [Imperial College of Science, Technology and Medicine, London (United Kingdom). Centre for Environmental Technology

    1999-02-01

    The wind flow field around urban street-building configurations has an important influence on the microscale pollutant dispersion from road traffic, affecting overall dilution and creating localised spatial variations of pollutant concentration. As a result, the ``representatives`` of air quality measurements made at different urban monitoring sites can be strongly dependent on the interaction of the local wind flow field with the street-building geometry surrounding the monitor. The present study is an initial attempt to develop a method for appraising the significance of air quality measurements from urban monitoring sites, using a general application computational fluid dynamics (CFD) code to simulate small-scale flow and dispersion patterns around real urban building configurations. The main focus of the work was to evaluate routine CO monitoring data collected by Westminster City Council at an intersection of street canyons at Marylebone Road, Central London. Many monitors in the UK are purposely situated at urban canyon intersections, which are thought to be local ``hot spots`` of pollutant emissions, however very limited information exists in the literature on the flow and dispersion patterns associated with them. With the use of simple CFD simulations and the analysis of available monitoring data, it was possible to gain insights into the effect of wind direction on the small-scale dispersion patterns at the chosen intersection, and how that can influence the data captured by a monitor. It was found that a change in wind direction could result in an increase or decrease of monitored CO concentration of up to 80%, for a given level of traffic emissions and meteorological conditions. Understanding and de-coupling the local effect of wind direction from monitoring data using the methods presented in this work could prove a useful new tool for urban monitoring data interpretation. (author)

  11. Safety inspections in construction sites: A systems thinking perspective.

    Science.gov (United States)

    Saurin, Tarcisio Abreu

    2016-08-01

    Although safety inspections carried out by government officers are important for the prevention of accidents, there is little in-depth knowledge on their outcomes and processes leading to these. This research deals with this gap by using systems thinking (ST) as a lens for obtaining insights into safety inspections in construction sites. Thirteen case studies of sites with prohibited works were carried out, discussing how four attributes of ST were used in the inspections. The studies were undertaken over 6 years, and sources of evidence involved participant observation, direct observations, analysis of documents and interviews. Two complementary ways for obtaining insights into inspections, based on ST, were identified: (i) the design of the study itself needs to be in line with ST; and (ii) data collection and analysis should focus on the agents involved in the inspections, the interactions between agents, the constraints and opportunities faced by agents, the outcomes of interactions, and the recommendations for influencing interactions. Copyright © 2015 Elsevier Ltd. All rights reserved.

  12. Scoping assessment of groundwater doses to biota at the Sellafield site, UK

    International Nuclear Information System (INIS)

    McDonald, P.; Gleizon, P.; Coleman, I.A.; Watts, S.J.; Batlle, L.V.; Smith, A.D.

    2008-01-01

    In the current climate of investigating the impact of discharges from the nuclear industry on non-human biota, much attention has been given to biota in marine and terrestrial environments in receipt of authorised discharges of liquid and gaseous effluent. Relatively little attention to date has been given to the exposure of biota to groundwater containing man-made radio-nuclides. This area of interest is growing especially in the field of nuclear waste repositories. A scoping assessment has been performed here to determine the impacts due to radiological contamination on organisms living within or coming into contact with groundwater at the Sellafield site, UK. The following potential exposure routes to biota were identified: 1) Organisms living within groundwater; 2) Groundwater discharges to the surface at beach springs (i.e. emerging above the low water line; 3) Groundwater discharges to nearby surface water bodies (e.g. rivers); 4) Groundwater discharges directly to the Irish Sea.. In order to evaluate impacts on organisms living within, contacting or ingesting groundwater, it was necessary to determine the activity concentration of radio-nuclides in the groundwater. For time periods up to 2120, modeling of contaminant release from in-ground inventories and transport in groundwater was carried out for this scoping study using a relatively simple assessment methodology with the MONDRIAN modeling suite. Screening assessments of radiological impacts upon wildlife have been performed for liquid discharges to groundwater from the Sellafield Ltd reprocessing plant at Sellafield, Cumbria. Impacts have been considered for biota at sites within reach of the groundwater flow network. Most calculated total weighted absorbed doses appear to be of no radiological significance whatsoever in relation to the new Environment Agency freshwater ecosystem trigger level (40 microGy h -1 ), thereby obviating the need to conduct further investigations. The one exception to this is

  13. Induced Seismicity at the UK "Hot Dry Rock" Test Site for Geothermal Energy Production

    Science.gov (United States)

    Li, Xun; Main, Ian; Jupe, Andrew

    2018-03-01

    In enhanced geothermal systems (EGS), fluid is injected at high pressure in order to stimulate fracturing and/or fluid flow through otherwise relatively impermeable underlying hot rocks to generate power and/or heat. The stimulation induces micro-earthquakes whose precise triggering mechanism and relationship to new and pre-existing fracture networks are still the subject of some debate. Here we analyse the dataset for induced micro-earthquakes at the UK "hot dry rock" experimental geothermal site (Rosemanowes, Cornwall). We quantify the evolution of several metrics used to characterise induced seismicity, including the seismic strain partition factor and the "seismogenic index". The results show a low strain partition factor of 0.01% and a low seismogenenic index indicating that aseismic processes dominate. We also analyse the spatio-temporal distribution of hypocentres, using simple models for the evolution of hydraulic diffusivity by (a) isotropic and (b) anisotropic pore-pressure relaxation. The principal axes of the diffusivity or permeability tensor inferred from the spatial distribution of earthquake foci are aligned parallel to the present-day stress field, although the maximum permeability is vertical, whereas the maximum principal stress is horizontal. Our results are consistent with a triggering mechanism that involves (a) seismic shear slip along optimally-oriented pre-existing fractures, (b) a large component of aseismic slip with creep (c) activation of tensile fractures as hydraulic conduits created by both the present-day stress field and by the induced shear slip, both exploiting pre-existing joint sets exposed in borehole data.

  14. Construction site Voice Operated Information System (VOIS) test

    Science.gov (United States)

    Lawrence, Debbie J.; Hettchen, William

    1991-01-01

    The Voice Activated Information System (VAIS), developed by USACERL, allows inspectors to verbally log on-site inspection reports on a hand held tape recorder. The tape is later processed by the VAIS, which enters the information into the system's database and produces a written report. The Voice Operated Information System (VOIS), developed by USACERL and Automated Sciences Group, through a ESACERL cooperative research and development agreement (CRDA), is an improved voice recognition system based on the concepts and function of the VAIS. To determine the applicability of the VOIS to Corps of Engineers construction projects, Technology Transfer Test Bad (T3B) funds were provided to the Corps of Engineers National Security Agency (NSA) Area Office (Fort Meade) to procure and implement the VOIS, and to train personnel in its use. This report summarizes the NSA application of the VOIS to quality assurance inspection of radio frequency shielding and to progress payment logs, and concludes that the VOIS is an easily implemented system that can offer improvements when applied to repetitive inspection procedures. Use of VOIS can save time during inspection, improve documentation storage, and provide flexible retrieval of stored information.

  15. Library construction and evaluation for site saturation mutagenesis.

    Science.gov (United States)

    Sullivan, Bradford; Walton, Adam Z; Stewart, Jon D

    2013-06-10

    We developed a method for creating and evaluating site-saturation libraries that consistently yields an average of 27.4±3.0 codons of the 32 possible within a pool of 95 transformants. This was verified by sequencing 95 members from 11 independent libraries within the gene encoding alkene reductase OYE 2.6 from Pichia stipitis. Correct PCR primer design as well as a variety of factors that increase transformation efficiency were critical contributors to the method's overall success. We also developed a quantitative analysis of library quality (Q-values) that defines library degeneracy. Q-values can be calculated from standard fluorescence sequencing data (capillary electropherograms) and the degeneracy predicted from an early stage of library construction (pooled plasmids from the initial transformation) closely matched that observed after ca. 1000 library members were sequenced. Based on this experience, we suggest that this analysis can be a useful guide when applying our optimized protocol to new systems, allowing one to focus only on good-quality libraries and reject substandard libraries at an early stage. This advantage is particularly important when lower-throughput screening techniques such as chiral-phase GC must be employed to identify protein variants with desirable properties, e.g., altered stereoselectivities or when multiple codons are targeted for simultaneous randomization. Copyright © 2013 Elsevier Inc. All rights reserved.

  16. Five years of nitrogen dioxide measurement with diffusion tube samplers at over 1000 sites in the UK

    Science.gov (United States)

    Stevenson, Ken; Bush, Tony; Mooney, Diane

    In 1993, a large (>1000 monitoring sites) co-ordinated monitoring network for nitrogen dioxide, using diffusion tube samplers, was established in urban areas throughout the UK. The primary aim of this network is to assess the spatial and temporal distribution of NO 2 throughout the UK and highlight areas of high concentration which may require more detailed monitoring with automatic analysers. This paper presents a summary of the results for the first 5-years of monitoring, 1993-1997 inclusive. The network has shown that highest concentrations occur in London and urban areas of Yorkshire and Humberside and the East and West Midlands of the UK. Averaged over the whole of the UK, NO 2 concentrations have been remarkably similar for most of the 5 years, though a significant decrease was observed at urban background locations in 1997. Overall, average NO 2 concentrations during 1997 were 23 ppb at kerbside locations and 13 ppb at urban background locations. The results of the network have been used by the Department of Environment, Transport and the Regions as one of the criteria for the selection of priority areas for expansion of the UK Automatic Urban Network in recent years. Extensive quality assurance and control procedures incorporated into the network ensure that the estimated accuracy of the data is broadly comparable with the accuracy requirement for indicative monitoring specified in the EU "daughter" Directive for NO2 (±25%) . The complete dataset of results for the network can be found on the world wide web at http://www.environment.detr.gov.uk/airq/aqinfo.htm.

  17. Siting and constructing very deep monitoring wells on the US Department of Energy's Nevada Test Site

    International Nuclear Information System (INIS)

    Cullen, J.J.; Jacobson, R.L.; Russell, C.E.

    1991-01-01

    Many aspects of the Nevada Test Site's (NTS) hydrogeologic setting restrict the use of traditional methods for the siting and construction of ground-water characterization and monitoring wells. The size of the NTS precludes establishing high-density networks of characterization wells, as are typically used at smaller sites. The geologic complexity and variability of the NTS requires that the wells be criticality situated. The hydrogeologic complexity requires that each well provide access to many aquifers. Depths to ground water on the NTS require the construction of wells averaging approximately 1000 meters in depth. Wells meeting these criteria are uncommon in the ground-water industry, therefore techniques used by petroleum engineers are being employed to solve certain siting-, design- and installation-related problems. To date, one focus has been on developing completion strings that facilitate routine and efficient ground-water sampling from multiple intervals in a single well. The method currently advocated employs a new design of sliding side door sleeve that is actuated by an electrically operated hydraulic shifting tool. Stemming of the wells is being accomplished with standard materials (cement based grouts and sands); however, new stemming methods are being developed, to accommodate the greater depths, to minimize pH-related problems caused by the use of cements, to enhance the integrity of the inter-zone seals, and to improve the representativeness of radionuclide analyses performed on ground-water samples. Bench-scale experiments have been used to investigate the properties of more than a dozen epoxy-aggregate grout mixtures -- materials that are commonly used in underwater sealing applications

  18. 'Man up!' Discursive constructions of non-drinkers among UK undergraduates.

    Science.gov (United States)

    Conroy, Dominic; de Visser, Richard

    2013-11-01

    This study adopted a discursive approach to explore how not drinking alcohol (non-drinking) is construed in relation to masculine identity among 12 undergraduate interviewees. Three prominent discourses were revealed. First, non-drinking was constructed as something strange requiring explanation. Second, contradictory discourses constructed non-drinking as, simultaneously, unsociable yet reflective of greater sociability. Third, non-drinking was constructed as something which has greater negative social consequences for men than for women. Opportunities for challenging traditional gender role expectations are considered.

  19. Re-Writing the Construction History of Boughton House (northamptonshire, Uk) with the Help of DOCU-TOOLS®

    Science.gov (United States)

    Schuster, J. C.

    2017-08-01

    The tablet-based software docu-tools digitize the documentation of buildings, simplifies construction and facility management and the data analysis in building and construction-history research. As a plan-based software, `pins' can be set to record data (images, audio, text etc.), each data point containing a time and date stamp. Once a pin is set and information recorded, it can never be deleted from the system, creating clear contentious-free documentation. Reports to any/all data recorded can immediately be generated through various templates in order to share, document, analyze and archive the information gathered. The software both digitizes building condition assessment, as well as simplifies the fully documented management and solving of problems and monitoring of a building. Used both in the construction industry and for documenting and analyzing historic buildings, docu-tools is a versatile and flexible tool that has become integral to my work as a building historian working on the conservation and curating of the historic built environment in Europe. I used the software at Boughton House, Northamptonshire, UK, during a one-year research project into the construction history of the building. The details of how docu-tools was used during this project will be discussed in this paper.

  20. Regulatory experience with ALARP investigation reports at some UK nuclear sites

    International Nuclear Information System (INIS)

    Robinson, I.F.; Turton, D.

    1991-01-01

    This paper describes the UK regulatory requirements placed on employers regarding the investigation of whether doses incurred are as low as reasonably practicable. It discusses the operational experience gained by an inspection Branch of the HM Nuclear Installations Inspectorate (NII) of the Health and Safety Executive which is the UK regulatory body responsible for the enforcement of these requirements. The general approach taken by employers to preparing investigation reports is discussed, and the form and content of the reports is considered. An aspect of the employers approach to dose restriction is discussed, and the NII's response to investigation reports is described. (Author)

  1. Geoelectrical monitoring of simulated subsurface leakage to support high-hazard nuclear decommissioning at the Sellafield Site, UK

    Energy Technology Data Exchange (ETDEWEB)

    Kuras, Oliver, E-mail: oku@bgs.ac.uk [British Geological Survey, Keyworth, Nottingham NG12 5GG (United Kingdom); Wilkinson, Paul B.; Meldrum, Philip I.; Oxby, Lucy S. [British Geological Survey, Keyworth, Nottingham NG12 5GG (United Kingdom); Uhlemann, Sebastian [British Geological Survey, Keyworth, Nottingham NG12 5GG (United Kingdom); ETH-Swiss Federal Institute of Technology, Institute of Geophysics, Sonneggstr. 5, 8092 Zurich (Switzerland); Chambers, Jonathan E. [British Geological Survey, Keyworth, Nottingham NG12 5GG (United Kingdom); Binley, Andrew [Lancaster Environment Centre, Lancaster University, Lancaster LA1 4YQ (United Kingdom); Graham, James [National Nuclear Laboratory, Central Laboratory, Sellafield, Seascale, Cumbria CA20 1PG (United Kingdom); Smith, Nicholas T. [National Nuclear Laboratory, Central Laboratory, Sellafield, Seascale, Cumbria CA20 1PG (United Kingdom); School of Earth, Atmospheric and Environmental Sciences, Williamson Building, University of Manchester, Oxford Road, Manchester M13 9PL (United Kingdom); Atherton, Nick [Sellafield Ltd, Albion Square, Swingpump Lane, Whitehaven CA28 7NE (United Kingdom)

    2016-10-01

    A full-scale field experiment applying 4D (3D time-lapse) cross-borehole Electrical Resistivity Tomography (ERT) to the monitoring of simulated subsurface leakage was undertaken at a legacy nuclear waste silo at the Sellafield Site, UK. The experiment constituted the first application of geoelectrical monitoring in support of decommissioning work at a UK nuclear licensed site. Images of resistivity changes occurring since a baseline date prior to the simulated leaks revealed likely preferential pathways of silo liquor simulant flow in the vadose zone and upper groundwater system. Geophysical evidence was found to be compatible with historic contamination detected in permeable facies in sediment cores retrieved from the ERT boreholes. Results indicate that laterally discontinuous till units forming localized hydraulic barriers substantially affect flow patterns and contaminant transport in the shallow subsurface at Sellafield. We conclude that only geophysical imaging of the kind presented here has the potential to provide the detailed spatial and temporal information at the (sub-)meter scale needed to reduce the uncertainty in models of subsurface processes at nuclear sites. - Graphical abstract: 3D fractional resistivity change (resistivity change Δρ divided by baseline resistivity ρ{sub 0}) image showing results of Stage 1 silo liquor simulant injection. The black line delineates the preferential flow path; green cylinders show regions of historic contamination found in sediment cores from ERT boreholes. - Highlights: • 4D geoelectrical monitoring at Sellafield detected and tracked simulated silo leaks. • ERT revealed likely pathways of silo liquor simulant flow in the subsurface. • The method can reduce uncertainty in subsurface process models at nuclear sites. • Has been applied in this form at a UK nuclear licensed site for the first time • Study demonstrates value of 4D geophysics for nuclear decommissioning.

  2. Sustainability assessment, rating systems and historical buildings Case study: Rehabilitated construction in a university site

    Directory of Open Access Journals (Sweden)

    Sadrykia Somayeh

    2016-01-01

    Full Text Available This paper explores the relationship between the indicators and different factors that “rating systems for green projects” concentrates on, and principles and factors considered in the rehabilitation of historical buildings. In recent years, different methods and systems concerned and improved for assessing environmental sustainability. LEED (Leadership in Energy and Environmental Design and BREEAM (Building Research Establishment (BRE Environmental Assessment Method are two most commonly used rating systems, established in U.S and UK. These systems comprise some categories and different factors to achieve environmentally responsible design. Firstly, this study focuses on the list of rating systems indicators and criteria. Secondly this paper investigates a historical rehabilitated building in the site of Tabriz Art University, as a case study and has tried to compile its green design elements. Finally, this work intends to compare mentioned elements with indicators and factors of building rating systems. Findings of the study revealed that “Materials and Resources”, “indoor environmental quality” and also “Sustainable Sites” ,the most significant indicator of rating systems, had major and important role in the rehabilitation of the building. Beyond this materials’ life cycle was considerable in construction.

  3. Women in the Construction Industry in the U.K.: a Cultural Discord?

    Science.gov (United States)

    Bagilhole, Barbara M.; Dainty, Andrew R. J.; Neale, Richard H.

    The construction industry is the most male dominated of all industrial sectors in the United Kingdom. This article reports on a study that explored women's and men's experiences of working in the industry, focusing on how the cultural aspects of the workplace environment impinged upon women's career development. We interviewed more than 80 male and female construction professionals from large construction organizations, and compared their career accounts in order to establish the aspects of the workplace culture that had a gender-differentiated impact on progression. We found that construction organizations formed competitive "power" cultures where women's contributions were marginalized and their careers impeded through a combination of inflexible work practices and discriminatory behavior. These barriers to women's careers were maintained in small project teams by autonomous male operational managers. Their locus of control embraced recruitment, promotion, and staff development, which allowed them to sustain a workplace culture intolerant of nontraditional entrants. We conclude that this cultural environment is likely to remain problematic for women unless it can be changed in a way that values their contribution. This requires a radical shift in middle management attitudes, a departure from current organizational human resource management systems, and a wider acceptance of the need for cultural change within the industry.

  4. Strategies to enhance waste minimization and energy conservation within organizations: a case study from the UK construction sector.

    Science.gov (United States)

    Jones, Jo; Jackson, Janet; Tudor, Terry; Bates, Margaret

    2012-09-01

    Strategies for enhancing environmental management are a key focus for the government in the UK. Using a manufacturing company from the construction sector as a case study, this paper evaluates selected interventionist techniques, including environmental teams, awareness raising and staff training to improve environmental performance. The study employed a range of methods including questionnaire surveys and audits of energy consumption and generation of waste to examine the outcomes of the selected techniques. The results suggest that initially environmental management was not a focus for either the employees or the company. However, as a result of employing the techniques, the company was able to reduce energy consumption, increase recycling rates and achieve costs savings in excess of £132,000.

  5. Construction Site Environmental Impact in Civil Engineering Education

    Science.gov (United States)

    Teixeira, Jose M. Cardoso

    2005-01-01

    The environmental impact of construction activity has gained increasing importance in the last few years and become a key subject for civil engineering education. A survey of Portuguese higher education institutions shows that concern with this topic is mostly directed at the impact of large construction projects and especially focused on their…

  6. Confined Site Construction: A qualitative investigation of critical issues affecting management of Health and Safety

    OpenAIRE

    Spillane, John P.; Oyedele, Lukumon O.; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E.; Tijani, Iyabo K.

    2011-01-01

    The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, th...

  7. Magnox Swarf Storage Silo Liquor Effluent Management -Sellafield Site, Cumbria, UK - Legacy radioactive waste storage - 59271

    International Nuclear Information System (INIS)

    Le Clere, Stephen

    2012-01-01

    The Sellafield Magnox Swarf Storage Silo (MSSS) was constructed to provide an underwater storage facility for irradiated magnox cladding metal Swarf, as well as miscellaneous beta-gamma waste from several sources. Liquid effluent arisings from hazard reduction activities at this facility represent the toughest effluent treatment challenge within the company's Legacy Ponds and Silos portfolio. The key requirement for hazard reduction has generated many substantial challenges as the facility is readied for decommissioning. This has demanded the production of carefully thought out strategies for managing, and overcoming, the key difficulties to be encountered as hazard reduction progresses. The complexity associated with preparing for waste retrievals from the Magnox Swarf Storage Silo, has also generated the demand for a mix of creativity and perseverance to meet the challenges and make progress. Challenging the status quo and willingness to accept change is not easy and the road to overall hazard reduction for the high hazard MSSS facility will demand the skills and investment of individuals, teams, and entire facility work-forces. The first steps on this road have been taken with the successful introduction of liquor management operations, however much more is yet to be achieved. Clear communication, investing in stakeholder management, perseverance in the face of difficulty and a structured yet flexible programme delivery approach, will ensure the continued success of tackling the complex challenges of treating liquid effluent from a legacy fuel storage silo at the Sellafield Site. (authors)

  8. Design and construction of past and present steam generators for the UK fast reactors

    International Nuclear Information System (INIS)

    Hayden, O.

    1975-01-01

    Double barrier sodium/water steam raising units were incorporated into the early DFR which has been operating since 1958, but to be economically viable the PFR units had to adopt a single wall concept. It should be remembered that the design style of PFR was decided upon in the early 1960's, when a very cautious approach had to be made. It was vital to ensure that a steam raising unit had the maximum availability and so a forced circulation system was chosen, making the steam generators consistent with all other power station boilers installed in the U.K. at that time. It is only recently that once-through steam cycles have been accepted in this country by the CEGB and these are on the A.G.R. stations currently being built. The 250 MWe Prototype Fast Reactor incorporates the world's largest sodium heated boilers and having gone critical some 6 months ago is currently undergoing various commissioning trials prior to its run-up to full power. The paper gives a brief description of these, with comments on particular features of Design, Development, nd countered to date are discussed, together with the way in which these have been overcome. Extensive research and development work has been carried out in support of Prototype Reactor and some of this continues well into the manufacture and commissioning programme. Critical areas such as tube-to-tubesheet welding, tube-grid fretting, burst disc and sodium/ water reaction work involves costly and time-consuming development. Sodium heated steam generators pose a greater number of problems to the designer than either fossil-fired or other types of nuclear steam raising plant. As in any boiler, economics demand that the heat exchanger surface is as compact as possible whilst retaining good 'low distribution inside and outside the tubes. Besides achieving a good thermal and mechanical design, the designer is faced with the possibility of a leak occurring and has to cater for the sodium/water reaction which may follow. Valuable

  9. Design and construction of past and present steam generators for the UK fast reactors

    Energy Technology Data Exchange (ETDEWEB)

    Hayden, O

    1975-07-01

    Double barrier sodium/water steam raising units were incorporated into the early DFR which has been operating since 1958, but to be economically viable the PFR units had to adopt a single wall concept. It should be remembered that the design style of PFR was decided upon in the early 1960's, when a very cautious approach had to be made. It was vital to ensure that a steam raising unit had the maximum availability and so a forced circulation system was chosen, making the steam generators consistent with all other power station boilers installed in the U.K. at that time. It is only recently that once-through steam cycles have been accepted in this country by the CEGB and these are on the A.G.R. stations currently being built. The 250 MWe Prototype Fast Reactor incorporates the world's largest sodium heated boilers and having gone critical some 6 months ago is currently undergoing various commissioning trials prior to its run-up to full power. The paper gives a brief description of these, with comments on particular features of Design, Development, nd countered to date are discussed, together with the way in which these have been overcome. Extensive research and development work has been carried out in support of Prototype Reactor and some of this continues well into the manufacture and commissioning programme. Critical areas such as tube-to-tubesheet welding, tube-grid fretting, burst disc and sodium/ water reaction work involves costly and time-consuming development. Sodium heated steam generators pose a greater number of problems to the designer than either fossil-fired or other types of nuclear steam raising plant. As in any boiler, economics demand that the heat exchanger surface is as compact as possible whilst retaining good 'low distribution inside and outside the tubes. Besides achieving a good thermal and mechanical design, the designer is faced with the possibility of a leak occurring and has to cater for the sodium/water reaction which may follow. Valuable

  10. Risk assessment-led characterisation of the SiteChar UK north sea site for the geological storage of CO2

    International Nuclear Information System (INIS)

    Akhurst, Maxine; Hannis, Sarah D.; Quinn, Martyn F.; Long, David; Shi, Ji-Quan; Koenen, Marielle; Pluymaekers, Maarten; Delprat-Jannaud, Florence; Lecomte, Jean-Claude; Bossie-Codreanu, Daniel; Nagy, Stanislaw; Klimkowski, Lukas; Gei, Davide

    2015-01-01

    Risk assessment-led characterisation of a site for the geological storage of CO 2 in the UK northern North Sea was performed for the EU SiteChar research project as one of a portfolio of sites. Implementation and testing of the SiteChar project site characterisation work-flow has produced a 'dry-run' storage permit application that is compliant with regulatory requirements. A site suitable for commercial-scale storage was characterised, compatible with current and future industrial carbon dioxide (CO 2 ) sources in the northern UK. Pre-characterisation of the site, based on existing information acquired during hydrocarbon exploration and production, has been achieved from publicly available data. The project concept is to store captured CO 2 at a rate of 5 Mt per year for 20 years in the Blake Oil Field and surrounding Captain Sandstone saline aquifer. This commercial-scale storage of 100 Mt CO 2 can be achieved through a storage scenario combining injection of CO 2 into the oil field and concurrent water production down-dip of the field. There would be no encroachment of supercritical phase CO 2 for more than two kilometres beyond the field boundary and no adverse influence on operating hydrocarbon fields provided there is pressure management. Components of a storage permit application for the site are presented, developed as far as possible within a research project. Characterisation and technical investigations were guided by an initial assessment of perceived risks to the prospective site and a need to provide the information required for the storage permit application. The emphasis throughout was to reduce risks and uncertainty on the subsurface containment of stored CO 2 , particularly with respect to site technical performance, monitoring and regulatory issues, and effects on other resources. The results of selected risk assessment-led site characterisation investigations and the subsequent risk reassessments are described together with their

  11. Induced Seismicity at the UK "Hot Dry Rock" Test Site for Geothermal Energy Production

    OpenAIRE

    Li, Xun; Main, Ian; Jupe, Andrew

    2018-01-01

    In enhanced geothermal systems (EGS), fluid is injected at high pressure in order to stimulate fracturing and/or fluid flow through otherwise relatively impermeable underlying hot rocks to generate power and/or heat. The stimulation induces micro-earthquakes whose precise triggering mechanism and relationship to new and pre-existing fracture networks are still the subject of some debate. Here we analyse the dataset for induced micro-earthquakes at the UK “hot dry rock” experimental geothermal...

  12. Geoelectrical monitoring of simulated subsurface leakage to support high-hazard nuclear decommissioning at the Sellafield Site, UK.

    Science.gov (United States)

    Kuras, Oliver; Wilkinson, Paul B; Meldrum, Philip I; Oxby, Lucy S; Uhlemann, Sebastian; Chambers, Jonathan E; Binley, Andrew; Graham, James; Smith, Nicholas T; Atherton, Nick

    2016-10-01

    A full-scale field experiment applying 4D (3D time-lapse) cross-borehole Electrical Resistivity Tomography (ERT) to the monitoring of simulated subsurface leakage was undertaken at a legacy nuclear waste silo at the Sellafield Site, UK. The experiment constituted the first application of geoelectrical monitoring in support of decommissioning work at a UK nuclear licensed site. Images of resistivity changes occurring since a baseline date prior to the simulated leaks revealed likely preferential pathways of silo liquor simulant flow in the vadose zone and upper groundwater system. Geophysical evidence was found to be compatible with historic contamination detected in permeable facies in sediment cores retrieved from the ERT boreholes. Results indicate that laterally discontinuous till units forming localized hydraulic barriers substantially affect flow patterns and contaminant transport in the shallow subsurface at Sellafield. We conclude that only geophysical imaging of the kind presented here has the potential to provide the detailed spatial and temporal information at the (sub-)meter scale needed to reduce the uncertainty in models of subsurface processes at nuclear sites. Copyright © 2016 British Geological Survey, NERC. Published by Elsevier B.V. All rights reserved.

  13. Massive use of pulverized fuel ash in concrete for the construction of a U.K. power station

    International Nuclear Information System (INIS)

    Davies, D.R.; Kitchener, J.N.

    1996-01-01

    This paper describes the incorporation and benefits of pulverized fuel ash (PFA) in nearly 620,000 m 2 of concrete used in the construction of the UK's first commercial pressurized light water nuclear reactor power station, Sizewell B, Suffolk. Overall nearly 100,000 t of PFA, 1,300 t of sintered fly ash lightweight aggregate, and nearly 137,000 t of Ordinary Portland Cement (OPC) were used in the works. Generally in the construction of the main power station buildings, structural concrete with a characteristic strength of 45 N/mm 2 was placed and included fly ash as 40% of the cementitious component. Also, concrete with fly ash as 50% of the cementitious component was placed as mass fill. The program of research is reported, including sulfate resistance, heat of hydration,elastic properties, alkali-silica reaction, and long-term strength test results. Test and field results are presented and discussed. Strict quality assurance procedures were enforced and statistical summaries are offered to give an insight into the quality of control exercised. Test work and long-term results are also outlined

  14. Repeated detection of European bat lyssavirus type 2 in dead bats found at a single roost site in the UK.

    Science.gov (United States)

    Banyard, Ashley C; Johnson, N; Voller, K; Hicks, D; Nunez, A; Hartley, M; Fooks, A R

    2009-01-01

    In August 2007, European bat lyssavirus type 2 (EBLV-2) was isolated from a Daubenton's bat found at Stokesay Castle. In September 2008, another bat from the same vicinity of Stokesay Castle also tested positive for EBLV-2. This is the first occurrence of repeated detection of EBLV-2 from a single site. Here, we report the detection of low levels of viral RNA in various bat organs by qRT-PCR and detection of viral antigen by immunohistochemistry. We also report sequence data from both cases and compare data with those derived from other EBLV-2 isolations in the UK.

  15. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  16. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sustainable principles for siting, design and construction. [Reserved] 433.6 Section 433.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS... BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  17. Strategies for effective management of health and safety in confined site construction

    Directory of Open Access Journals (Sweden)

    John Spillane

    2013-12-01

    Full Text Available Purpose: The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. Design/Methodology/Approach: This is achieved by utilising individual interviews, focus groups discussion on selected case studies of confined construction sites, coupled with a questionnaire survey. Findings: The top five key strategies include (1 Employ safe system of work plans to mitigate personnel health and safety issues; (2 Inform personnel, before starting on-site, of the potential issues using site inductions; (3 Effective communication among site personnel; (4 Draft and implement an effective design site layout prior to starting on-site; and (5 Use of banksman (traffic co-ordinator to segregate personnel from vehicular traffic. Practical Implication: The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. Originality/Value: This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.

  18. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    Scott, D.E.; Pechmann, J.H.K.; Knox, J.N.; Estes, R.A.; McGregor, J.H.; Bailey, K.

    1988-12-01

    The Savannah River Ecology Laboratory has completed 10 years of ecological studies related to the construction of the Defense Waste Processing Facility (DWPF) on the Savannah River Site. This progress report examines water quality studies on streams peripheral to the DWPF construction site and examines the effectiveness of ''refuge ponds'' in ameliorating the effects of construction on local amphibians. Individual papers on these topics are indexed separately. 93 refs., 15 figs., 15 tabs

  19. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Scott, D.E.; Pechmann, J.H.K.; Knox, J.N.; Estes, R.A.; McGregor, J.H.; Bailey, K. (ed.)

    1988-12-01

    The Savannah River Ecology Laboratory has completed 10 years of ecological studies related to the construction of the Defense Waste Processing Facility (DWPF) on the Savannah River Site. This progress report examines water quality studies on streams peripheral to the DWPF construction site and examines the effectiveness of refuge ponds'' in ameliorating the effects of construction on local amphibians. Individual papers on these topics are indexed separately. 93 refs., 15 figs., 15 tabs. (MHB)

  20. Construction of Basic Evaluation Criteria for Candidate HLW Repository Sites (1)

    International Nuclear Information System (INIS)

    Koh, Yong Kwon; Bae, Dae Seok; Kim, Kyung Su; Kim, Geon Young; Park, Kyung Woo; Ji, Sung Hoon; Ryu, Ji Hun

    2009-08-01

    We constructed the preliminary site assessment system for selection of proper site as high level radioactive disposal repository with consideration of Korean geological characteristics and underground environments. And, site assessment factor and standard as a point of geologic aspect were suggested for decision of candidate radioactive disposal site in Korea. The results can be used to develop the geological information system for assessment of candidate disposal site

  1. Improving Site Management Practices in the Nigerian Construction ...

    African Journals Online (AJOL)

    Site management involves a combination of activities, which turn basic resources into a finished product. The effectiveness of managing production process cannot be economically attained by force, but requires the creation of conditions that will encourage self-motivation and bring about team spirit that is important to an ...

  2. Utilisation of employee assistance programme to reduce absenteeism on construction sites

    OpenAIRE

    2013-01-01

    M.Tech (Construction Management) Many construction companies are beginning to realize the value of their employees. Employees are to a large extent the engine of the organisation. Todays employees are under a lot of pressure and stress from home and at the construction sites. The construction industry just like any other industry, is faced with the challenges of dealing with personal as well as work related problems. These problems they have effect on job performance. An Employee assistanc...

  3. AN ASSESSMENT OF FACTORS AFFECTING MATERIAL STOCK CONTROL PRACTICE ON SELECTED CONSTRUCTION SITES IN NIGERIA

    OpenAIRE

    Adafin, Johnson Kayode; Ayodele, Elijah Olusegun; Daramola, Olufemi

    2011-01-01

    This research examines the stock control methods utilized by construction firms on construction sites with a view to assessing the factors affecting material stock control practice by construction firms as well as determining the impact of factors affecting material stock control on building project performance. Data were collected with the aid of well-structured questionnaire administered on a number of construction professionals and technicians in some randomly selected building constructio...

  4. New Reactor Siting, Licensing and Construction Experience. Proceedings of the 2. CNRA International Workshop on 'New Reactor Siting, Licensing and Construction Experience'

    International Nuclear Information System (INIS)

    2013-01-01

    This report documents the proceedings from the 2. Workshop on New Reactor Siting, Licensing and Construction Experience. A total of 45 specialists from 16 countries and international organisations attended. The meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the US Nuclear Regulatory Commission (U.S.NRC). The objectives of the workshop were to provide a forum to exchange information on lessons learned from siting, licensing and constructing new nuclear power plants around the world. Key focus areas included siting practices and regulatory positions that have been enhanced as a result of the Fukushima accident; lessons learned from licensing and design review approaches and challenges, construction experience and recommendations for regulatory oversight; and regulatory cooperation on generic and design specific issues through the MDEP specific working groups. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to regulatory cooperation on generic and design specific issues, MDEP working groups (EPR, AP1000), vendor inspection co-operation, digital I and C, and codes and standards. The second technical session was intended to discuss and share regulatory positions on siting practices and enhancements as a result of lessons learned from Fukushima accident. The third technical session addressed the construction experience and regulatory oversight of new reactor construction activities. And the fourth technical session included presentations on the lessons learned from regulatory licensing reviews of new reactor designs

  5. Disaggregation of collective dose-a worked example based on future discharges from the Sellafield nuclear fuel reprocessing site, UK

    International Nuclear Information System (INIS)

    Jones, S R; Lambers, B; Stevens, A

    2004-01-01

    Collective dose has long been advocated as an important measure of the detriment associated with practices that involve the use of radioactivity. Application of collective dose in the context of worker protection is relatively straightforward, whereas its application in the context of discharges to the environment can yield radically different conclusions depending upon the population groups and integration times that are considered. The computer program PC-CREAM98 has been used to provide an indicative disaggregation into individual dose bands of the collective dose due to potential future radioactive discharges from the nuclear fuel reprocessing site at Sellafield in the UK. Two alternative discharge scenarios are considered, which represent a 'stop reprocessing early, minimum discharge' scenario and a 'reprocessing beyond current contracts' scenario. For aerial discharges, collective dose at individual effective dose rates exceeding 0.015 μSv y -1 is only incurred within the UK, and at effective dose rates exceeding 1.5 μSv y -1 is only incurred within about 20 km of Sellafield. The geographical distribution of collective dose from liquid discharges is harder to assess, but it appears that collective dose incurred outside the UK is at levels of individual effective dose rate below 1.5 μSv y -1 , with the majority being incurred at rates of 0.002 μSv y -1 or less. In multi-attribute utility analyses, the view taken on the radiological detriment to be attributed to the two discharge scenarios will depend critically on the weight or monetary value ascribed to collective doses incurred within the differing bands of individual dose rate

  6. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Pechmann, J.H.K.; Scott, D.E.; McGregor, J.H.; Estes, R.A.; Chazal, A.C.

    1993-02-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980's. The Savannah River Ecology Laboratory (SREL) has completed 12 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of refuge ponds'' as alternative breeding sites for amphibians that formerly bred at Sun Bay Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10CFR1022).

  7. Environmental Assessment for the construction and operation of the Health Physics Site Support Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    1995-07-01

    DOE has prepared an environmental assessment for the proposed construction and operation of the Health Physics Site Support Facility on the Savannah River Site. This (new) facility would meet requirements of the site radiological protection program and would ensure site compliance with regulations. It was determined that the proposed action is not a major Federal action significantly affecting the quality of the environment within the meaning of NEPA. Therefore, a finding of no significant impact is made, and no environmental impact statement is needed

  8. Nuclear archaeology: the influence of decommissioning on future reactor siting in the UK

    International Nuclear Information System (INIS)

    Openshaw, S.

    1990-01-01

    Whereas considerations of waste, cost, opinion, and the law are often abstract elements of nuclear power, the siting of generating stations produces concrete land use and aesthetic reminders of its presence. What will future generations find as a result of the nuclear era? Will the power plant sites be restored to greenfield conditions? When will this occur? How will such decisions affect surrounding land use and societal characteristics such as employment opportunities and quality of life? These and other questions revolve around the land use and siting links to decommissioning decisions. The two prime determinants of the land use legacy will be the timing of stage 3 dismantlement and the degree to which the sites can be restored to pre-use conditions. In this chapter it is argued that the sites are unlikely ever to be released for unrestricted use, but rather that the use and the visual impacts of the sites will increase over time, eventually becoming the objects which, perhaps, future archaeologists will study. (author)

  9. Critical management practices influencing on-site waste minimization in construction projects.

    Science.gov (United States)

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  10. A Study Identifying Causes of Construction Waste Production and Applying Safety Management on Construction Site

    Directory of Open Access Journals (Sweden)

    Ali Asghar Najafpoor

    2014-09-01

    Full Text Available Background and purpose: In a recent century, the amount of construction waste has increased significantly. Although the building industry has a considerable role in the development of a society, it is regarded as an environmentally destructive. Source reduction is the highest goal in the waste management hierarchy and is in priority. It also has economic benefits by reducing costs associated with transportation, disposal or recycling of wastes. The present study is aimed to identify activities generating the wastes in design, transportation and storage and procurement of building materials. Materials and Methods: This was questionnaire survey. A total of 94 professionals in the construction industry were attended in this study. To determine the validity and reliability of the instrument, content validity method and Cronbach’s alpha coefficient (0.79 were used. Data were analyzed using SPSS for Windows. Frequencies, percentage, mean and standard deviation were determined in this research. Results: The results showed that handling and storage have been chosen as the most causative factor of waste production in construction activity. Improper material storage was identified major factor in producing waste in handling and storage phase. Usage of low-quality material in design stage and material price changes in procurement were recognized as major causes of waste production in these stages. Conclusion: All studied phases in this research were identified as causative factors in producing of waste. Identifying causes of construction waste production will help us decide better how to control this sort of wastes.

  11. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  12. A study on air pollution concentration at Desa parkcity construction site

    African Journals Online (AJOL)

    This study assesses the effect of construction workers exposure towards the air pollution to the correlation between meteorological factor with the particulate matter and other gases concentration at a construction site in DesaParkcity. The concentration of PM was collected by using low volume sampler meanwhile CO, CO2, ...

  13. Occupational health and safety in the Moroccan construction sites: preliminary diagnosis

    Science.gov (United States)

    Tarik, Bakeli; Adil, Hafidi Alaoui

    2018-05-01

    Managing occupational health and safety on Moroccan construction sector represents the first step for projects' success. In fact, by avoiding accidents, all the related direct and indirect costs and delays can be prevented. That leads to an important question always asked by any project manager: what are the factors responsible for accidents? How can they be avoided? Through this research, the aim is to go through these questions, to contribute in occupational health and safety principles understanding, to identify construction accidentology and risk management opportunities and to approach the case of Moroccan construction sites by an accurate diagnosis. The approach is to make researchers, managers, stakeholders and deciders aware about the criticality of construction sites health and safety situation. And, to do the first step for a scientific research project in relation with health and safety in the Moroccan construction sector. For this, the paper will study the related state of art namely about construction sites accidents causation, and will focus on Reason's `Swiss cheese' model and its utilization for Moroccan construction sites health and safety diagnosis. The research will end with an estimation of an accidents fatality rate in the Moroccan construction sector and a benchmarking with the international rates. Finally, conclusions will be presented about the necessity of Occupational Health and Safety Management System (OHSMS) implementation, which shall cover all risk levels, and insure, at the same time, that the necessary defenses against accidents are on place.

  14. The construction of under-representation in UK and Swedish higher education:Implications for disabled students

    OpenAIRE

    Weedon, Elisabet

    2017-01-01

    This article examines the inclusion of disabled students in the UK and Swedish higher education systems. In the UK, performance indicators focus on the participation rate of disabled students in comparison with those of non-disabled students, while in Sweden there are no specific performance indicators relating to disabled students. The paper notes that in both countries there is a dearth of inter-sectional data, recognising the heterogeneity of the disabled student population. It is argued t...

  15. Experience in applying quality assurance to civil construction work on the Heysham site

    International Nuclear Information System (INIS)

    Wise, D.L.

    1985-01-01

    A comparison of the civil construction works experience on Heysham I nuclear power plant with that of Heysham II following the introduction of a quality system provided on insight into the benefits resulting from quality assurance. These included: improved administration, better identification of responsibility and improved communications, improved pre-planning, better records, and greater control over activities with Suppliers and Sub-contractors. For Heysham II the full benefits of quality assurance were realised by integrating it into the management system and through the practical understanding achieved with the Client. (U.K.)

  16. Marketing Research of Construction Sites based on ABC-XYZ Analysis and Relational Data

    Directory of Open Access Journals (Sweden)

    Konikov Aleksandr

    2017-01-01

    Full Text Available ABC-XYZ analysis is well known in marketing. It allows identifying sites that yield maximum profits when sold, sites that enjoy stable demand, or sites have both qualities specified above. However, the methods are quite abstract and are not designed to study specific factors that impact the results of ABC-XYZ analysis. Meanwhile, for some applications, particularly for marketing research of construction sites, it is critical not only to identify high-profit and stable sites but also to find out what combination of technical parameters, factors related to their location, transport accessibility, etc. are typical of them. This work suggests an approach to address the issue.

  17. Developing a system dynamics model to analyse environmental problem in construction site

    Science.gov (United States)

    Haron, Fatin Fasehah; Hawari, Nurul Nazihah

    2017-11-01

    This study aims to develop a system dynamics model at a construction site to analyse the impact of environmental problem. Construction sites may cause damages to the environment, and interference in the daily lives of residents. A proper environmental management system must be used to reduce pollution, enhance bio-diversity, conserve water, respect people and their local environment, measure performance and set targets for the environment and sustainability. This study investigates the damaging impact normally occur during the construction stage. Environmental problem will cause costly mistake in project implementation, either because of the environmental damages that are likely to arise during project implementation, or because of modification that may be required subsequently in order to make the action environmentally acceptable. Thus, findings from this study has helped in significantly reducing the damaging impact towards environment, and improve the environmental management system performance at construction site.

  18. Assumption and program of the earlier stage construction of L/ILW disposal site

    International Nuclear Information System (INIS)

    Li Xuequn; Chen Shi; Li Xinbang

    1993-01-01

    The authors analysed the production and treatment of low- and intermediate-level radwastes (L/ILW) in China. Some problems and situation in this field are introduced. Over the past ten years, preliminary efforts have been made by CNNC (China National Nuclear Corporation) in policy, law and rules, developing program, management system, siting, engineering techniques, and safety assessment for radwaste disposal. The investment of the earlier stage work of L/ILW disposal site construction is estimated, the program and assumption to disposal site construction of the L/ILW are reviewed

  19. Construction quality assurance for Pit 6 landfill closure, Lawrence Livermore National Laboratory, Site 300

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-30

    Golder Construction Services, Inc. (GCS), under contract to the Regents of the University of California, Lawrence Livermore National Laboratory (LLNL), provided the construction quality assurance (CQA) observation and testing during the construction of the Site 300, Pit 6 landfill closure cover. The cap construction was performed as a CERCLA non-time-critical removal action from June 2 to August 29, 1997. the project site is located 18 miles east of Livermore on Tesla Road and approximately 10 miles southwest of Tracy on Corral Hollow Road in San Joaquin County, California. This report certifies that the LLNL, Site 300, Pit 6, Landfill Closure was constructed in accordance with the construction specifications and design drawings. This report documents construction activities and CQA monitoring and testing for construction of the Pit 6 Landfill Closure. Golder Associates, Inc. of Oakland, California was the design engineering firm responsible for preparation of the drawings and specifications. CQA services were provided by GCS, of Roseville, California, under supervision of a California registered civil Engineer.

  20. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    International Nuclear Information System (INIS)

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development

  1. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development.

  2. The occupational safety on the construction sites of the farm production buildings in Finland

    Directory of Open Access Journals (Sweden)

    M. Hellstedt

    2013-09-01

    Full Text Available The size of farms has increased considerably during Finland's EU membership. The growth has meant big investments in the new production buildings. The buildings have been switched to big industrialhall- like constructions from small-scale ones which have contained own timber and own work contribution. The objective of the project financed by Farmers' Social Insurance Institution was to improve occupational safety on farm building construction and renovation sites by disseminating current safety practices and by developing ways of action which are better than the prevailing ones. The project consisted of a literature review, statistical analysis, as well as a farmer and designer interviews. In the statistical analysis the MATA occupational injuries insurance claims database on farmers’ claims during construction and renovation work for the years 2005 - 2008 was compared with the register of Federation of Accident Insurance Institutions on the construction workers' injuries. In comparing the reasons of the accidents a clear difference was found; poor scaffoldings and ladders are still the main culprits on farm accidents. Farmer interviews were used to assess occupational safety measures on the construction site, occurred injuries and their types, nearmiss situations and the underlying factors which have led to the injuries. Also construction safety deficiencies as well as the direct and indirect costs caused for instance because of the delay in completion of construction project were discussed. Designer interviews aimed to find out how occupational safety and health considerations are taken into account in farm building planning and counseling, and how this experience of the designers should be utilized in order to improve safety at the construction sites on farms. Farmers knew their obligations on occupational safety poorly. The situation was further worsened by the fact that on the site the supervisor tasks were only nominally executed. The

  3. Ecological conditions of ponds situated on blast furnace slag deposits located in South Gare Site of Special Scientific Interest (SSSI), Teesside, UK.

    Science.gov (United States)

    Raper, E; Davies, S; Perkins, B; Lamb, H; Hermanson, M; Soares, A; Stephenson, T

    2015-06-01

    Slag, a by-product from the iron and steel industry, has a range of applications within construction and is used in wastewater treatment. Historically considered a waste material, little consideration was given to the environmental impacts of its disposal. South Gare (a Site of Special Scientific Interest) located at the mouth of the Tees estuary, UK, formed on slag deposits used to create a sea wall and make the land behind permanent. Over time, ponds formed in depressions with the water chemistry, being significantly impacted by the slag deposits. Calcium levels reached 504 mg/L, nitrate 49.0 mg/L and sulphate 1,698 mg/L. These levels were also reflected in the composition of the sediment. pH (5.10-9.90) and electrical conductivity (2,710-3,598 µS/cm) were variable but often notably high. Pb, Cu and Cd were not present within the water, whilst Zn ranged from 0.027 to 0.37 mg/L. Heavy metal levels were higher in surface sediments. Zinc was most dominant (174.3-1,310.2 mg/L) followed by Pb (9.9-431 mg/L), Cu (8.4-41.8 mg/L) and Cd (0.4-1.1 mg/L). A sediment core provided a historical overview of the ponds. The ponds were unfavourable for aquatic biodiversity and unsuitable for drinking water abstraction.

  4. The potential impact of green agendas on historic river landscapes: Numerical modelling of multiple weir removal in the Derwent Valley Mills world heritage site, UK

    Science.gov (United States)

    Howard, A. J.; Coulthard, T. J.; Knight, D.

    2017-09-01

    The exploitation of river systems for power and navigation has commonly been achieved through the installation of a variety of in-channel obstacles of which weirs in Britain are amongst the most common. In the UK, the historic value of many of these features is recognised by planning designations and protection more commonly associated with historic buildings and other major monuments. Their construction, particularly in the north and west of Britain, has often been associated with industries such as textiles, chemicals, and mining, which have polluted waterways with heavy metals and other contaminants. The construction of weirs altered local channel gradients resulting in sedimentation upstream with the potential as well for elevated levels of contamination in sediments deposited there. For centuries these weirs have remained largely undisturbed, but as a result of the growth in hydropower and the drive to improve water quality under the European Union's Water Framework Directive, these structures are under increasing pressure to be modified or removed altogether. At present, weir modifications appear to be considered largely on an individual basis, with little focus on the wider impacts this might have on valley floor environments. Using a numerical modelling approach, this paper simulates the removal of major weirs along a 24-km stretch of the river Derwent, Derbyshire, UK, designated as a UNESCO World Heritage Site. The results suggest that although removal would not result in significant changes to the valley morphology, localised erosion would occur upstream of structures as the river readjusts its base level to new boundary conditions. Modelling indicates that sediment would also be evacuated away from the study area. In the context of the Derwent valley, this raises the potential for the remobilisation of contaminants (legacy sediments) within the wider floodplain system, which could have detrimental, long-term health and environmental implications for the

  5. Childhood leukaemia and non-Hodgkin's lymphoma near large rural construction sites, with a comparison with Sellafield nuclear site

    International Nuclear Information System (INIS)

    Kinlen, L.J.; Dickson, M.; Stiller, C.A.

    1995-01-01

    The objective was to determine whether population mixing produced by large, non-nuclear construction projects in rural areas is associated with an increase in childhood leukaemia and non-Hodgkin's lymphoma. A study was undertaken of the incidence of leukaemia and non-Hodgkin's lymphoma among children living near large construction projects in Britain since 1945, situated more than 20 km from a population centre, involving a workforce of more than 1000, and built over three or more calendar years. A 37% excess of leukaemia and non-Hodgkin's lymphoma at 0-14 years of age was recorded during construction and the following calendar year. The excesses were greater at times when construction workers and operating staff overlapped (72%), particularly in areas of relatively high social class. For several sites the excesses were similar to or greater than that near the nuclear site of Sellafield (67%), which is distinctive in its large workforce with many construction workers. Seascale, near Sellafield, with a ninefold increase had an unusually high proportion of residents in social class I. The findings support the infection hypothesis and reinforce the view that the excess of childhood leukaemia and non-Hodgkin's lymphoma near Sellafield has a similar explanation. (author)

  6. Unit soil loss rate from various construction sites during a storm.

    Science.gov (United States)

    Maniquiz, Marla C; Lee, Soyoung; Lee, Eunju; Kong, Dong-Soo; Kim, Lee-Hyung

    2009-01-01

    The Korean Ministry of Environment (MOE) opts to establish an ordinance having a standard specifying an allowable soil loss rate applicable to construction projects. The predicted amount of soil loss from a construction site exceeding the standard can be used to calculate the percent reduction necessary to comply with the ordinance. This research was conducted to provide a basis to establish a standard by investigating the unit soil loss rates in the three phases of development: pre-construction, active construction and post construction based from 1,036 Environmental Impact Assessment (EIA) reports within the six-year period (2000-2005). Based on the findings, several factors affect the magnitude of soil loss rates particularly storm characteristics, site slope, soil type, location from rivers, as well as the type of construction activity. In general, the unit soil loss rates during the active construction phase are extremely higher in comparison to undisturbed areas; in magnitude of 7 to 80 times larger in urban areas and 18 to 585 times in rural areas. Only between 20 to 40 percent of the soil loss rates was contributed at pre- and post- construction phases indicating that the active construction phase is the most important phase to control.

  7. The Legal Implications of Student Use of Social Networking Sites in the UK and US: Current Concerns and Lessons for the Future

    Science.gov (United States)

    Davies, Mark R.; Lee, Barbara A.

    2008-01-01

    This paper provides a comparative snapshot of the current state of the law in the US and UK with respect to potential liability of university and college students for use (and misuse) of social networking sites. It reviews the limited case law on this topic, highlights the differences in the two nations' laws of defamation and the various possible…

  8. Site infrastructure as required during the construction and erection of nuclear power plants

    International Nuclear Information System (INIS)

    Haas, K.F.; Wagner, H.

    1978-01-01

    In general, in an exchange of experience on constructing nuclear power plants priority is given to design and lay-out, financing, quality assurance etc., but in this paper an attempt has been made to describe range and type of site infrastructure required during construction and erection. Site infrastructure will make considerable demands on the planning, supply of material and maintenance that may result from the frequently very isolated location of power plant sites. Examples for specific values and experiences are given for a nuclear power plant with two units on the 1300-MW type at present under construction of the Persian Gulf in Iran. Data concerning the site infrastructure, including examples, are given and explained on the basis of graphs. The site is split up into a technical and a social infrastructure. The main concern of the technical site infrastructure is the timely provision and continuous availability of electric energy, water, communication grids, workshops, warehouses, offices, transport and handling facilities, as well as the provision of heavy load roads, harbour facilities, etc. The social site infrastructure in general comprises accommodation, food supplies and the care and welfare of all site personnel, which includes a hospital, school, self-service shop, and sport and recreation facilities. (author)

  9. Study of relationship between time overrun and productivity on construction sites

    Directory of Open Access Journals (Sweden)

    Ameh, Oko John

    2011-12-01

    Full Text Available The history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. In an attempt to reverse this trend, this study aims at establishing the relationship between time overrun and labour productivity on construction sites in Lagos, Nigeria. 43 technical and management staff of some medium and large construction firms based in Lagos, Nigeria were sampled and administered a questionnaire survey. The questionnaire contained 18 causes of project time overrun and 14 causes of low labour productivity which had been identified from the literature reviewed. With these a relationship between project time overrun and low labour productivity was established. Both descriptive and inferential statistics were used in analyzing the data. Results indicate that inadequate funds for the project, inadequate planning before project takeoff, inadequate tools and equipment and delay in delivery of material top the list of major causes of time overrun while the use of wrong construction methods, inadequate construction materials and inaccurate drawing/specification are the key factors causing low labour productivity on construction sites. Significant negative relationship was found between time overrun and labour productivity in construction sites in Nigeria. The study concludes by recommending that early appointment of project managers could ensure proper management of both the human and material resources that could guarantee improved productivity and ultimately save projects from time overrun.

  10. Modeling injury rates as a function of industrialized versus on-site construction techniques.

    Science.gov (United States)

    Rubio-Romero, J C; Suárez-Cebador, M; Abad, Jesús

    2014-05-01

    It is often predicted that the industrialization of building activities will lead to a reduction of accident rates in the construction sector, particularly as a result of switching activities from building sites to factories. However, to date no scientific research has provided objective quantitative results to back up this claim. The aim of this paper is to evaluate how industrialization affects the accident rate in different industrialized building systems in Spain. Our results revealed that the industrialized steel modular system presents the lowest accident rate, while the highest accident rate was recorded in the construction method with cast-in-place concrete. The lightweight construction system also presents a high accident rate. Accordingly, industrialized building systems cannot claim to be safer than traditional ones. The different types of "on-site work" seem to be the main variable which would explain the accident rates recorded in industrialized construction systems. Copyright © 2014 Elsevier Ltd. All rights reserved.

  11. Smooth Operator - Mobile Information Technology for Improved Flow at the Construction Site

    DEFF Research Database (Denmark)

    Tambo, Torben

    2010-01-01

    is used; mobility is classified as remote, local or micro. Furthermore an extensive literature study is employed along with both market screening for systems and case studies of companies adopting as well as rejecting the technology. Both within research communities, software manufacturers......Mobile information technology (IT) seems an ideal innovation to promote effectiveness of the construction process, particularly at the construction site; research has over the last 15 years focused on solutions, potentials and barriers with this field. This paper aim at the duality between research...... and industry for an updated and forward looking comprehension, and view of tendencies, of the roles and potentials of mobile IT at the construction site including potential for further research. Qualitative and interpretive methodology inspired by information systems and sociology of research and construction...

  12. Problematising the "Career Academic" in UK Construction and Engineering Education: Does the System Want What the System Gets?

    Science.gov (United States)

    Pilcher, Nick; Forster, Alan; Tennant, Stuart; Murray, Mike; Craig, Nigel

    2017-01-01

    "Career Academics" are principally research-led, entering academia with limited or no industrial or practical experience. UK Higher Education Institutions welcome them for their potential to attain research grant funding and publish world-leading journal papers, ultimately enhancing institutional reputation. This polemical paper…

  13. Prototype Environmental Assessment of the impacts of siting and construction of an SPS ground receiving station

    Science.gov (United States)

    Hill, J.

    1980-01-01

    A prototype assessment of the environmental impacts of siting and constructing a Satellite Power System (SPS) Ground Receiving Station (GRS) is reported. The objectives of the study were: (1) to develop an assessment of the nonmicrowave related impacts of the reference system SPS GRS on the natural environment; (2) to assess the impacts of GRS construction and operations in the context of actual baseline data for a site in the California desert; and (3) to identify critical GRS characteristics or parameters that are most significant in terms of the natural environment.

  14. Safety leadership at construction sites: the importance of rule-oriented and participative leadership.

    Science.gov (United States)

    Grill, Martin; Pousette, Anders; Nielsen, Kent; Grytnes, Regine; Törner, Marianne

    2017-07-01

    Objectives The construction industry accounted for >20% of all fatal occupational accidents in Europe in 2014. Leadership is an essential antecedent to occupational safety. The aim of the present study was to assess the influence of transformational, active transactional, rule-oriented, participative, and laissez-faire leadership on safety climate, safety behavior, and accidents in the Swedish and Danish construction industry. Sweden and Denmark are similar countries but have a large difference in occupational accidents rates. Methods A questionnaire study was conducted among a random sample of construction workers in both countries: 811 construction workers from 85 sites responded, resulting in site and individual response rates of 73% and 64%, respectively. Results The results indicated that transformational, active transactional, rule-oriented and participative leadership predict positive safety outcomes, and laissez-faire leadership predict negative safety outcomes. For example, rule-oriented leadership predicts a superior safety climate (β=0.40, Pleadership on workers' safety behavior was moderated by the level of participative leadership (β=0.10, Pleadership behaviors on safety outcomes were largely similar in Sweden and Denmark. Rule-oriented and participative leadership were more common in the Swedish than Danish construction industry, which may partly explain the difference in occupational accident rates. Conclusions Applying less laissez-faire leadership and more transformational, active transactional, participative and rule-oriented leadership appears to be an effective way for construction site managers to improve occupational safety in the industry.

  15. Regulation of nuclear power in the UK after Chernobyl

    International Nuclear Information System (INIS)

    Ryder, E.A.

    1987-01-01

    The essential philosophy underlying safe nuclear power in the UK is to establish a safe design and then monitor the manufacture, construction, commissioning, operation and maintenance to ensure that the safe design intent is not violated either deliberately or unintentionally. In the UK any commercial nuclear installation must have a nuclear site licence. The Nuclear Installations Inspectorate (NII) is the agency responsible for granting licences and ensuring the safe design and operation of the installation by the licensee. The way in which the NII does this for the 27 licensed sites that it regulates in the UK is explained. This covers plant assessment and site inspection. Following the accident at Chernobyl the NII reviewed the way in which it regulates nuclear power in the UK. Some changes in specific areas were recommended but no changes in the general philosophy were considered necessary. (UK)

  16. Selection of nest-site habitat by interior least terns in relation to sandbar construction

    Science.gov (United States)

    Sherfy, Mark H.; Stucker, Jennifer H.; Buhl, Deborah A.

    2012-01-01

    Federally endangered interior least terns (Sternula antillarum) nest on bare or sparsely vegetated sandbars on midcontinent river systems. Loss of nesting habitat has been implicated as a cause of population declines, and managing these habitats is a major initiative in population recovery. One such initiative involves construction of mid-channel sandbars on the Missouri River, where natural sandbar habitat has declined in quantity and quality since the late 1990s. We evaluated nest-site habitat selection by least terns on constructed and natural sandbars by comparing vegetation, substrate, and debris variables at nest sites (n = 798) and random points (n = 1,113) in bare or sparsely vegetated habitats. Our logistic regression models revealed that a broader suite of habitat features was important in nest-site selection on constructed than on natural sandbars. Odds ratios for habitat variables indicated that avoidance of habitat features was the dominant nest-site selection process on both sandbar types, with nesting terns being attracted to nest-site habitat features (gravel and debris) and avoiding vegetation only on constructed sandbars, and avoiding silt and leaf litter on both sandbar types. Despite the seemingly uniform nature of these habitats, our results suggest that a complex suite of habitat features influences nest-site choice by least terns. However, nest-site selection in this social, colonially nesting species may be influenced by other factors, including spatial arrangement of bare sand habitat, proximity to other least terns, and prior habitat occupancy by piping plovers (Charadrius melodus). We found that nest-site selection was sensitive to subtle variation in habitat features, suggesting that rigor in maintaining habitat condition will be necessary in managing sandbars for the benefit of least terns. Further, management strategies that reduce habitat features that are avoided by least terns may be the most beneficial to nesting least terns.

  17. Facile Site-Directed Mutagenesis of Large Constructs Using Gibson Isothermal DNA Assembly.

    Science.gov (United States)

    Yonemoto, Isaac T; Weyman, Philip D

    2017-01-01

    Site-directed mutagenesis is a commonly used molecular biology technique to manipulate biological sequences, and is especially useful for studying sequence determinants of enzyme function or designing proteins with improved activity. We describe a strategy using Gibson Isothermal DNA Assembly to perform site-directed mutagenesis on large (>~20 kbp) constructs that are outside the effective range of standard techniques such as QuikChange II (Agilent Technologies), but more reliable than traditional cloning using restriction enzymes and ligation.

  18. The Discursive Construction of Teachers’ Desirable Identity on a Social Networking Site

    Directory of Open Access Journals (Sweden)

    Radzuwan Ab Rashid

    2016-09-01

    Full Text Available This study is situated in the broader identity-construction literature. Bringing discourse community theory to examine teachers’ postings on Facebook Timelines, we explored how teachers discursively construct socially desirable identities to fit into the Timeline community. Data were gathered from the Status updates and Comments on 29 Timelines belonged to Malaysian English language teachers who were purposively chosen as they often posted and commented on teaching-related issues on their Timelines. The analysis shows that the commonest form of identity construction on the teachers’ Timelines was as an engager which had been carefully constructed to portray positive self-image. This paper concludes that when participating on a public networking site, the teachers were being strategic as not to construct identities which could tarnish their professional image.

  19. Climatic and psychosocial risks of heat illness incidents on construction site.

    Science.gov (United States)

    Jia, Yunyan Andrea; Rowlinson, Steve; Ciccarelli, Marina

    2016-03-01

    The study presented in this paper aims to identify prominent risks leading to heat illness in summer among construction workers that can be prioritised for developing effective interventions. Samples are 216 construction workers' cases at the individual level and 26 construction projects cases at the organisation level. A grounded theory is generated to define the climatic heat and psychosocial risks and the relationships between risks, timing and effectiveness of interventions. The theoretical framework is then used to guide content analysis of 36 individual onsite heat illness cases to identify prominent risks. The results suggest that heat stress risks on construction site are socially constructed and can be effectively managed through elimination at supply chain level, effective engineering control, proactive control of the risks through individual interventions and reactive control through mindful recognition and response to early symptoms. The role of management infrastructure as a base for effective interventions is discussed. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  20. Enhanced On-Site Waste Management of Plasterboard in Construction Works: A Case Study in Spain

    Directory of Open Access Journals (Sweden)

    Ana Jiménez-Rivero

    2017-03-01

    Full Text Available On-site management of construction waste commonly determines its destination. In the case of plasterboard (PB, on-site segregation becomes crucial for closed-loop recycling. However, PB is commonly mixed with other wastes in Spain. In this context, the involvement of stakeholders that can contribute to reversing this current situation is needed. This paper analyzes on-site waste management of PB in Spain through a pilot study of a construction site, with the main objective of identifying best practices to increase waste prevention, waste minimization, and the recyclability of the waste. On-site visits and structured interviews were conducted. The results show five management stages: PB distribution (I; PB installation (II; Construction waste storage at the installation area (III; PB waste segregation at the installation area (IV and PB waste transfer to the PB container and storage (V. The proposed practices refer to each stage and include the merging of Stages III and IV. This measure would avoid the mixing of waste fractions in Stage III, maximizing the recyclability of PB. In addition, two requisites for achieving enhanced management are analyzed: ‘Training and commitment’ and ‘fulfilling the requirements established by the current regulation’. The results show that foremen adopted a more pessimistic attitude than installers towards a joint commitment for waste management. Moreover, not all supervisors valued the importance of a site waste management plan, regulated by the Royal Decree 105/2008 in Spain.

  1. Design and implementation of an identification system in construction site safety for proactive accident prevention.

    Science.gov (United States)

    Yang, Huanjia; Chew, David A S; Wu, Weiwei; Zhou, Zhipeng; Li, Qiming

    2012-09-01

    Identifying accident precursors using real-time identity information has great potential to improve safety performance in construction industry, which is still suffering from day to day records of accident fatality and injury. Based on the requirements analysis for identifying precursor and the discussion of enabling technology solutions for acquiring and sharing real-time automatic identification information on construction site, this paper proposes an identification system design for proactive accident prevention to improve construction site safety. Firstly, a case study is conducted to analyze the automatic identification requirements for identifying accident precursors in construction site. Results show that it mainly consists of three aspects, namely access control, training and inspection information and operation authority. The system is then designed to fulfill these requirements based on ZigBee enabled wireless sensor network (WSN), radio frequency identification (RFID) technology and an integrated ZigBee RFID sensor network structure. At the same time, an information database is also designed and implemented, which includes 15 tables, 54 queries and several reports and forms. In the end, a demonstration system based on the proposed system design is developed as a proof of concept prototype. The contributions of this study include the requirement analysis and technical design of a real-time identity information tracking solution for proactive accident prevention on construction sites. The technical solution proposed in this paper has a significant importance in improving safety performance on construction sites. Moreover, this study can serve as a reference design for future system integrations where more functions, such as environment monitoring and location tracking, can be added. Copyright © 2011 Elsevier Ltd. All rights reserved.

  2. Evaluation of Acquisition Strategies for Image-Based Construction Site Monitoring

    Science.gov (United States)

    Tuttas, S.; Braun, A.; Borrmann, A.; Stilla, U.

    2016-06-01

    Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM). The BIM contains the as-planned states (geometry, schedule, costs, ...) of a construction project. For updating, the as-built state has to be acquired repeatedly and compared to the as-planned state. In the approach presented here, a 3D representation of the as-built state is calculated from photogrammetric images using multi-view stereo reconstruction. On construction sites one has to cope with several difficulties like security aspects, limited accessibility, occlusions or construction activity. Different acquisition strategies and techniques, namely (i) terrestrial acquisition with a hand-held camera, (ii) aerial acquisition using a Unmanned Aerial Vehicle (UAV) and (iii) acquisition using a fixed stereo camera pair at the boom of the crane, are tested on three test sites. They are assessed considering the special needs for the monitoring tasks and limitations on construction sites. The three scenarios are evaluated based on the ability of automation, the required effort for acquisition, the necessary equipment and its maintaining, disturbance of the construction works, and on the accuracy and completeness of the resulting point clouds. Based on the experiences during the test cases the following conclusions can be drawn: Terrestrial acquisition has the lowest requirements on the device setup but lacks on automation and coverage. The crane camera shows the lowest flexibility but the highest grade of automation. The UAV approach can provide the best coverage by combining nadir and oblique views, but can be limited by obstacles and security aspects. The accuracy of the point clouds is evaluated based on plane fitting of selected building parts. The RMS errors of the fitted parts range from 1 to a few cm for the UAV and the hand-held scenario. First results show that the crane camera

  3. EVALUATION OF ACQUISITION STRATEGIES FOR IMAGE-BASED CONSTRUCTION SITE MONITORING

    Directory of Open Access Journals (Sweden)

    S. Tuttas

    2016-06-01

    Full Text Available Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM. The BIM contains the as-planned states (geometry, schedule, costs, ... of a construction project. For updating, the as-built state has to be acquired repeatedly and compared to the as-planned state. In the approach presented here, a 3D representation of the as-built state is calculated from photogrammetric images using multi-view stereo reconstruction. On construction sites one has to cope with several difficulties like security aspects, limited accessibility, occlusions or construction activity. Different acquisition strategies and techniques, namely (i terrestrial acquisition with a hand-held camera, (ii aerial acquisition using a Unmanned Aerial Vehicle (UAV and (iii acquisition using a fixed stereo camera pair at the boom of the crane, are tested on three test sites. They are assessed considering the special needs for the monitoring tasks and limitations on construction sites. The three scenarios are evaluated based on the ability of automation, the required effort for acquisition, the necessary equipment and its maintaining, disturbance of the construction works, and on the accuracy and completeness of the resulting point clouds. Based on the experiences during the test cases the following conclusions can be drawn: Terrestrial acquisition has the lowest requirements on the device setup but lacks on automation and coverage. The crane camera shows the lowest flexibility but the highest grade of automation. The UAV approach can provide the best coverage by combining nadir and oblique views, but can be limited by obstacles and security aspects. The accuracy of the point clouds is evaluated based on plane fitting of selected building parts. The RMS errors of the fitted parts range from 1 to a few cm for the UAV and the hand-held scenario. First results show that the crane

  4. Workers’ Age and the Impact of Psychological Factors on the Perception of Safety at Construction Sites

    Directory of Open Access Journals (Sweden)

    Muhammad Dawood Idrees

    2017-05-01

    Full Text Available The safety of construction workers is always a major concern at construction sites as the construction industry is inherently dangerous with many factors influencing worker safety. Several studies concluded that psychological factors such as workload, organizational relationships, mental stress, job security, and job satisfaction have significant effects on workers’ safety. However, research on psychological factors that are characteristic of different age groups have been limited. The aim of this study was to examine the impact of psychological factors on the perception of worker safety for two different age groups. After an extensive literature review, different psychological factors were identified, and a hypothetical research model was developed based on psychological factors that could affect workers’ perception of safety. A survey instrument was developed, and data were collected from seven different construction sites in Pakistan. Structural equation modeling (SEM was employed to test the hypothetical model for both age groups. The results revealed that workload and job satisfaction are significantly dominant factors on workers’ perception of safety in older workers, whereas organizational relationships, mental stress, and job security are dominant factors for younger workers at construction sites.

  5. The motivational safety helmet : Redesign suggestions improving the intrinsic motivation of construction site workers

    NARCIS (Netherlands)

    Beldman, T. (Teunis); Boer, de J. (Johannes); Lemmens, P. (Pim); Stilma, M. (Margot)

    2014-01-01

    In reaction to the lack of intrinsic motivation of construction site workers, to wear their safety helmets at all times, a series of research projects studied causes and possible solutions. Goal is to gain an inspirational discussion to get the design onto the next level. This paper describes a

  6. Usability evaluation of mobile ICT support used at the building construction site

    DEFF Research Database (Denmark)

    Christiansson, Per; Svidt, Kjeld

    2006-01-01

    The paper summarizes findings from field evaluations and controlled laboratory usability evaluations of new mobile Information and Communication Technology, ICT, support used by craftsmen at construction sites as well as a discussion of methodologies for user centred ICT tools design. The finding...

  7. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  8. Engineered surface barriers for waste disposal sites: lysimeter facility design and construction

    International Nuclear Information System (INIS)

    Phillips, S.J.; Ruben, M.S.; Kirkham, R.R.

    1988-01-01

    A facility to evaluate performance of engineered surface carriers for confinement of buried wastes has been designed, constructed, and operations initiated. The Field Lysimeter Test Facility is located at the US Department of Energy's Hanford Site in Richland, Washington. The facility consists of 18 one-dimensional drainage and weighing lysimeters used to evaluate 7 replicated barrier treatments. Distinct layers of natural earth materials were used to construct layered soil and rock barriers in each lysimeter. These barrier designs are capable in principal of significantly reducing or precluding infiltration of meteoric water through barriers into underlying contaminated zones. This paper summarizes salient facility design and construction features used in testing of the Hanford Site's engineered surface barriers

  9. Construction of hexahedral elements mesh capturing realistic geometries of Bayou Choctaw SPR site

    Energy Technology Data Exchange (ETDEWEB)

    Park, Byoung Yoon [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Roberts, Barry L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-09-01

    The three-dimensional finite element mesh capturing realistic geometries of Bayou Choctaw site has been constructed using the sonar and seismic survey data obtained from the field. The mesh is consisting of hexahedral elements because the salt constitutive model is coded using hexahedral elements. Various ideas and techniques to construct finite element mesh capturing artificially and naturally formed geometries are provided. The techniques to reduce the number of elements as much as possible to save on computer run time with maintaining the computational accuracy is also introduced. The steps and methodologies could be applied to construct the meshes of Big Hill, Bryan Mound, and West Hackberry strategic petroleum reserve sites. The methodology could be applied to the complicated shape masses for not only various civil and geological structures but also biological applications such as artificial limbs.

  10. Construction quality assurance closure report, Lawrence Livermore National Laboratory Site 300, Pits 1 and 7

    International Nuclear Information System (INIS)

    1993-02-01

    This document presents the Final Construction Quality Assurance (CQA) report for the closure cover system of two mixed, low-level radioactive and hazardous waste landfills (pits) at Site 300. Site 300, operated by the Lawrence Livermore National Laboratory (LLNL), is located in the Altamont Hills, approximately 15 miles southeast of Livermore, California. The purpose of this report is to document the CQA program established to assure that construction is completed in accordance with the design intent and the approved Closure and Post Closure Plans dated May 1989 and revised January 1990 (EPA ID Number: CA 2890090002). Inclusive within the Closure and Post Closure Plan were the CQA Plan and the Technical Specifications for the final cover system. This report contains a complete narrative with photographic documentation of the construction activities and progress, problems encountered and solutions utilized, and third party testing and monitoring results, thus establishing the verification of compliance with the Quality Assurance Plan for the project

  11. Differences among Job Positions Related to Communication Errors at Construction Sites

    Science.gov (United States)

    Takahashi, Akiko; Ishida, Toshiro

    In a previous study, we classified the communicatio n errors at construction sites as faulty intention and message pattern, inadequate channel pattern, and faulty comprehension pattern. This study seeks to evaluate the degree of risk of communication errors and to investigate differences among people in various job positions in perception of communication error risk . Questionnaires based on the previous study were a dministered to construction workers (n=811; 149 adminis trators, 208 foremen and 454 workers). Administrators evaluated all patterns of communication error risk equally. However, foremen and workers evaluated communication error risk differently in each pattern. The common contributing factors to all patterns wer e inadequate arrangements before work and inadequate confirmation. Some factors were common among patterns but other factors were particular to a specific pattern. To help prevent future accidents at construction sites, administrators should understand how people in various job positions perceive communication errors and propose human factors measures to prevent such errors.

  12. Improving construction site safety through leader-based verbal safety communication.

    Science.gov (United States)

    Kines, Pete; Andersen, Lars P S; Spangenberg, Soren; Mikkelsen, Kim L; Dyreborg, Johnny; Zohar, Dov

    2010-10-01

    The construction industry is one of the most injury-prone industries, in which production is usually prioritized over safety in daily on-site communication. Workers have an informal and oral culture of risk, in which safety is rarely openly expressed. This paper tests the effect of increasing leader-based on-site verbal safety communication on the level of safety and safety climate at construction sites. A pre-post intervention-control design with five construction work gangs is carried out. Foremen in two intervention groups are coached and given bi-weekly feedback about their daily verbal safety communications with their workers. Foremen-worker verbal safety exchanges (experience sampling method, n=1,693 interviews), construction site safety level (correct vs. incorrect, n=22,077 single observations), and safety climate (seven dimensions, n=105 questionnaires) are measured over a period of up to 42 weeks. Baseline measurements in the two intervention and three control groups reveal that foremen speak with their workers several times a day. Workers perceive safety as part of their verbal communication with their foremen in only 6-16% of exchanges, and the levels of safety at the sites range from 70-87% (correct observations). Measurements from baseline to follow-up in the two intervention groups reveal that safety communication between foremen and workers increases significantly in one of the groups (factor 7.1 increase), and a significant yet smaller increase is found when the two intervention groups are combined (factor 4.6). Significant increases in the level of safety are seen in both intervention groups (7% and 12% increases, respectively), particularly in regards to 'access ways' and 'railings and coverings' (39% and 84% increases, respectively). Increases in safety climate are seen in only one of the intervention groups with respect to their 'attention to safety.' No significant trend changes are seen in the three control groups on any of the three measures

  13. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    International Nuclear Information System (INIS)

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete

  14. Status of the Texas low-level radioactive waste disposal site - construction sequencing and staffing patterns

    International Nuclear Information System (INIS)

    Jacobi, L.R. Jr.

    1996-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority, an agency of the State of Texas, has been attempting to develop a site for the disposal of low-level radioactive waste in Texas for more than fourteen years. Since 1991, the agency has been evaluating a site near Sierra Blanca, in far west Texas. Site characterization was completed in 1992, and a license application was filed that year. Construction plans were completed in 1993. In April 1996, the licensing agency, the Texas Natural Resource Conservation Commission, completed its review and proposed to issue a license. The administrative hearings on the proposed license should be completed by July 1997. The Authority is prepared to begin construction and operations as soon as a final license can be issued

  15. Habitat composition and connectivity predicts bat presence and activity at foraging sites in a large UK conurbation.

    Science.gov (United States)

    Hale, James D; Fairbrass, Alison J; Matthews, Tom J; Sadler, Jon P

    2012-01-01

    Urbanization is characterized by high levels of sealed land-cover, and small, geometrically complex, fragmented land-use patches. The extent and density of urbanized land-use is increasing, with implications for habitat quality, connectivity and city ecology. Little is known about densification thresholds for urban ecosystem function, and the response of mammals, nocturnal and cryptic taxa are poorly studied in this respect. Bats (Chiroptera) are sensitive to changing urban form at a species, guild and community level, so are ideal model organisms for analyses of this nature. We surveyed bats around urban ponds in the West Midlands conurbation, United Kingdom (UK). Sites were stratified between five urban land classes, representing a gradient of built land-cover at the 1 km(2) scale. Models for bat presence and activity were developed using land-cover and land-use data from multiple radii around each pond. Structural connectivity of tree networks was used as an indicator of the functional connectivity between habitats. All species were sensitive to measures of urban density. Some were also sensitive to landscape composition and structural connectivity at different spatial scales. These results represent new findings for an urban area. The activity of Pipistrellus pipistrellus (Schreber 1774) exhibited a non-linear relationship with the area of built land-cover, being much reduced beyond the threshold of ∼60% built surface. The presence of tree networks appears to mitigate the negative effects of urbanization for this species. Our results suggest that increasing urban density negatively impacts the study species. This has implications for infill development policy, built density targets and the compact city debate. Bats were also sensitive to the composition and structure of the urban form at a range of spatial scales, with implications for land-use planning and management. Protecting and establishing tree networks may improve the resilience of some bat

  16. Habitat composition and connectivity predicts bat presence and activity at foraging sites in a large UK conurbation.

    Directory of Open Access Journals (Sweden)

    James D Hale

    Full Text Available Urbanization is characterized by high levels of sealed land-cover, and small, geometrically complex, fragmented land-use patches. The extent and density of urbanized land-use is increasing, with implications for habitat quality, connectivity and city ecology. Little is known about densification thresholds for urban ecosystem function, and the response of mammals, nocturnal and cryptic taxa are poorly studied in this respect. Bats (Chiroptera are sensitive to changing urban form at a species, guild and community level, so are ideal model organisms for analyses of this nature.We surveyed bats around urban ponds in the West Midlands conurbation, United Kingdom (UK. Sites were stratified between five urban land classes, representing a gradient of built land-cover at the 1 km(2 scale. Models for bat presence and activity were developed using land-cover and land-use data from multiple radii around each pond. Structural connectivity of tree networks was used as an indicator of the functional connectivity between habitats. All species were sensitive to measures of urban density. Some were also sensitive to landscape composition and structural connectivity at different spatial scales. These results represent new findings for an urban area. The activity of Pipistrellus pipistrellus (Schreber 1774 exhibited a non-linear relationship with the area of built land-cover, being much reduced beyond the threshold of ∼60% built surface. The presence of tree networks appears to mitigate the negative effects of urbanization for this species.Our results suggest that increasing urban density negatively impacts the study species. This has implications for infill development policy, built density targets and the compact city debate. Bats were also sensitive to the composition and structure of the urban form at a range of spatial scales, with implications for land-use planning and management. Protecting and establishing tree networks may improve the resilience of some

  17. Controls on accumulation and soil solution partitioning of heavy metals across upland sites in United Kingdom (UK).

    Science.gov (United States)

    Zia, Afia; van den Berg, Leon; Ahmad, Muhammad Nauman; Riaz, Muhammad; Zia, Dania; Ashmore, Mike

    2018-05-31

    A significant body of knowledge suggests that soil solution pH and dissolved organic carbon (DOC) strongly influence metal concentrations and speciation in porewater, however, these effects vary between different metals. This study investigated the factors influencing soil and soil solution concentrations of copper (Cu), lead (Pb), nickel (Ni) and zinc (Zn) under field conditions in upland soils from UK having a wide range of pH, DOC and organic matter contents. The study primarily focussed on predicting soil and soil solution metal concentrations from the data on total soil metal concentrations (HNO 3 extracts) and soil and soil solution properties (pH, DOC and organic matter content). We tested the multiple regression models proposed by Tipping et al. (2003) to predict heavy metal concentrations in soil solutions and the results indicated a better fit (higher R 2 values) in both studies for Pb compared to the Zn and Cu concentrations. Both studies observed consistent negative relationships of metals with pH and loss on ignition (LOI) suggesting an increase in soil solution metal concentrations with increasing acidity. The positive relationship between Pb concentrations in porewater and HNO 3 extracts was similar for both studies, however, similar relationships were not found for the Zn and Cu concentrations because of the negative coefficients for these metals in our study. The results of this study conclude that the predictive equations of Tipping et al. (2003) may not be applicable to the field sites where the range of DOC and metal concentrations is much lower than their study. Our study also suggests that the extent to which metals are partitioned into soil solution is lower in soils with a higher organic matter contents due to binding of these metals to soil organic matter. Copyright © 2018 Elsevier Ltd. All rights reserved.

  18. UK Nuclear Workforce Demand

    International Nuclear Information System (INIS)

    Roberts, John

    2017-01-01

    UK Nuclear Sites: DECOMMISSIONING - 26 Magnox Reactors, 2 Fast Reactors; OPERATIONAL - 14 AGRs, 1 PWR; 9.6 GWe Total Capacity. Nuclear Workforce Demand • Total workforce demand is expected to grow from ~88,000 in 2017 to ~101,000 in 2021 • Average “inflow” is ~7,000 FTEs per annum • 22% of the workforce is female (28% in civil, 12% in defence) • 81% generic skills, 18% nuclear skills, 1% subject matter experts • 3300 trainees total in SLCs and Defence Enterprise (16% graduate trainees) • At peak demand on Civils Construction, over 4,000 workers will be required on each nuclear new build site • Manufacturing workforce is expected to rise from around 4,000 in 2014 to 8,500 at the peak of onsite activity in 2025

  19. Virtual Prototyping for Construction Site Co2 Emissions and Hazard Detection

    Directory of Open Access Journals (Sweden)

    Johnny Kwok Wai Wong

    2014-08-01

    Full Text Available The need for an efficient means of managing emissions and identifying potential hazard black spots in construction processes effectively and at the lowest cost possible has been highlighted in the construction sector. This study illustrates an integrated 5D model developed for quantifying carbon emissions and simulating the pattern of emissions of construction processes as a whole using virtual prototyping technologies. The predicted construction emissions data for each activity is generated and plotted to visually demonstrate the emission rates alongside the integrated four-dimensional VP framework of the construction project. The model also consists of a pro-active construction management system (PCMS, which assist the project team to detect sources of danger to on-site workers and provide pro-active warnings to them so as to avoid fatal accidents that are often caused by falling from heights and being struck by moving objects. A Hong Kong high-rise housing development project is used to exhibit the application of the carbon emission visualisation and potential accident detection system. This tool aims to encourage construction industry practitioners to become more environmentally conscious and pro-active in carbon mitigation and safety performance.

  20. THREE-DIMENSIONAL GEOFILTRATIONAL MODEL OF THE ROGUN HYDRO POWER PLANT CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Khokhotva Sergey Nikolaevich

    2017-05-01

    Full Text Available The article deals with technique of creation and results of calculations of the three-dimensional geofiltrational model of the Rogun HPP construction site. When performing works on creation of the Rogun HPP three-dimensional geofiltration model, geological and hydrogeological conditions of the Rogun HPP construction site were analyzed. They showed that the construction site consists mostly of fractured rocks of various weathering degrees. In terms of preservation, four preservation zones were identified in the rock mass. These zones define the features of hydrogeological conditions that have emerged in the area of construction. Calculation results illustrated the absence of seepage areas on the lower slope of dam; this is the indication of normal operation of the dam impervious circuit. The drainage system of the underground hydropower plant has a high efficiency. Operation of the drainage galleries complex leads to a significant reduction of piezometric pressure on roofs of the machine and transformer halls. Above the underground structures a completely drained area is formed. Completed forecast calculations on geofiltration model of the Rogun hydropower plant determine the hydrostatic pressure and piezometric pressure at any point of the modeled area. These data can be used as loads while designing of lining of underground workings.

  1. Quantifying and modeling soil erosion and sediment export from construction sites in southern California

    Science.gov (United States)

    Wernet, A. K.; Beighley, R. E.

    2006-12-01

    Soil erosion is a power process that continuously alters the Earth's landscape. Human activities, such as construction and agricultural practices, and natural events, such as forest fires and landslides, disturb the landscape and intensify erosion processes leading to sudden increases in runoff sediment concentrations and degraded stream water quality. Understanding soil erosion and sediment transport processes is of great importance to researchers and practicing engineers, who routinely use models to predict soil erosion and sediment movement for varied land use and climate change scenarios. However, existing erosion models are limited in their applicability to constructions sites which have highly variable soil conditions (density, moisture, surface roughness, and best management practices) that change often in both space and time. The goal of this research is to improve the understanding, predictive capabilities and integration of treatment methodologies for controlling soil erosion and sediment export from construction sites. This research combines modeling with field monitoring and laboratory experiments to quantify: (a) spatial and temporal distribution of soil conditions on construction sites, (b) soil erosion due to event rainfall, and (c) potential offsite discharge of sediment with and without treatment practices. Field sites in southern California were selected to monitor the effects of common construction activities (ex., cut/fill, grading, foundations, roads) on soil conditions and sediment discharge. Laboratory experiments were performed in the Soil Erosion Research Laboratory (SERL), part of the Civil and Environmental Engineering department at San Diego State University, to quantify the impact of individual factors leading to sediment export. SERL experiments utilize a 3-m by 10-m tilting soil bed with soil depths up to 1 m, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). Preliminary modeling, field and laboratory

  2. Site characterization and construction of a controlled shallow test site in central Mexico for archaeological and engineering applications

    Science.gov (United States)

    Rosado-Fuentes, A.; Arango-Galvan, C.; Arciniega-Ceballos, A.; Hernández-Quintero, J. E.; Mendo-Perez, G.

    2017-12-01

    A controlled shallow test site (CSTS) has been constructed at the UNAM Geomagnetic Observatory in Teoloyucan, central Mexico. The objective of the CSTS is to have a controlled place to test new developments and arrays that can be used for archaeological and engineering exploration, as well as to calibrate instruments, train students and for future research. The CSTS was built far enough not to influence the geomagnetic sensors and not be affected by noise sources. Special attention was given to the distribution and geometry of buried materials as well as the instruments used. Before the CSTS was built, a combination of near-surface, non-invasive geophysical techniques was performed to characterize the area of 20 by 32 meters. The methods include magnetometry, electromagnetic induction, ground penetrating radar (GPR), electrical resistivity tomography (ERT) and seismic refraction tomography (SRT). The GPR, SRT and ERT results show relatively flat interfaces. In general, the vertical gradient of the total magnetic field and the electric conductivity have very small variations, showing only one strong magnetic dipole associated to a shallow anomaly. These results indicate that the area is ideal for the construction of the test site. The CSTS consists on buried structures made with different materials and geometries (cubes, cylinders and tubes) commonly used as construction materials in Mexico since Pre-Hispanic times. These materials include concrete, reinforced concrete, wood, brick, adobe, basalt, tezontle and also empty space for controlling responses. The CSTS is versatile enough to be reshaped considering new geometries or materials and to conduct further investigations.

  3. Regulatory inspection activities on nuclear power plant sites during construction in the United Kingdom

    International Nuclear Information System (INIS)

    Jeffery, J.V.

    1977-01-01

    The work of regulatory inspection of the construction of the plant on the site is performed not only by the inspector who has been allocated to inspection duties for that site but also by the specialist staff who are involved with the safety assessment of the plant. The co-ordination of this work is described in the paper and examples are given of inspection activities associated with the enforcement requirements of licence conditions as well as those related to the inspection of the plant itself. (author)

  4. Sites of Memory and the Construction of Democracy: Spain and Chile

    Directory of Open Access Journals (Sweden)

    Maria Chiara Bianchini

    2014-11-01

    Full Text Available This article compares the histories of two sites of memory located in the capital cities of Spain and Chile. Both sites are considered outstanding symbols of the last military dictatorship and their evolution over the past decade reflects the difficult construction of public discourses on dictatorial violence. Both processes take place at the end of two transitions to democracies that have followed similar patterns and have interacted with each other in many ways. Still, these two societies have handled very differently the dictatorial past and its representations.

  5. The measurement of radon concentration of soil in a civil construction site

    International Nuclear Information System (INIS)

    Liu Hanbin; Fan Guang

    2004-01-01

    Radon is one of radioactive resources which do harm to human body. Therefore, its concentration in the soil should be measured before the civil construction works. Code for Indoor Environmental Pollution Control of Civil Building Engineering (GB50325-2001) is the main norm used for soil radon concentration measurement. By using FD-3017 RaA radon measuring equipment, the soil radon concentration in a civil building engineering site has been measured, the result shows that the concentration is lower than the regional average value, radon protective measures should not be installed in that site. (authors)

  6. Criteria for the siting, construction, management and evaluation of low and intermediate activity radioactive waste stores

    International Nuclear Information System (INIS)

    Granero, J.J.

    1986-01-01

    The experience acquired by Spain for the storage of low and intermediate level radioactive wastes, is presented. General considerations related to the technology, financing, administrative measures and risk determination are done. The criteria of site selection for construction and management of the waste storage facility are described, evaluating the specific criteria for the licensing procedure, and taking in account the safety and the radiation protection during periods of the system operation. (M.C.K.) [pt

  7. Modeling injury rates as a function of industrialized versus on-site construction techniques

    OpenAIRE

    Rubio Romero, Juan Carlos; Suárez Cebador, Manuel; Abad Puente, Jesús

    2014-01-01

    It is often predicted that the industrialization of building activities will lead to a reduction of accident rates in the construction sector, particularly as a result of switching activities from building sites to factories. However, to date no scientific research has provided objective quantitative results to back up this claim. The aim of this paper is to evaluate how industrialization affects the accident rate in different industrialized building systems in Spain. Our results revealed tha...

  8. Mechanisms controlling lateral and vertical porewater migration of depleted uranium (DU) at two UK weapons testing sites

    Energy Technology Data Exchange (ETDEWEB)

    Graham, Margaret C., E-mail: Margaret.Graham@ed.ac.uk [School of GeoSciences, Crew Building, University of Edinburgh, The King' s Buildings, West Mains Road, Edinburgh, EH9 3JN (United Kingdom); Oliver, Ian W.; MacKenzie, Angus B.; Ellam, Robert M. [Scottish Universities Environmental Research Centre (SUERC), Rankine Avenue, Scottish Enterprise Technology Park, East Kilbride, G75 0QF (United Kingdom); Farmer, John G. [School of GeoSciences, Crew Building, University of Edinburgh, The King' s Buildings, West Mains Road, Edinburgh, EH9 3JN (United Kingdom)

    2011-04-15

    Uranium associations with colloidal and truly dissolved soil porewater components from two Ministry of Defence Firing Ranges in the UK were investigated. Porewater samples from 2-cm depth intervals for three soil cores from each of the Dundrennan and Eskmeals ranges were fractionated using centrifugal ultrafiltration (UF) and gel electrophoresis (GE). Soil porewaters from a transect running downslope from the Dundrennan firing area towards a stream (Dunrod Burn) were examined similarly. Uranium concentrations and isotopic composition were determined using Inductively Coupled Plasma-Mass Spectrometry (ICP-MS) and Multi-Collector-Inductively Coupled Plasma-Mass Spectrometry (MC-ICP-MS), respectively. The soils at Dundrennan were Fe- and Al-rich clay-loam soils whilst at Eskmeals, they were Fe- and Al-poor sandy soils; both, however, had similar organic matter contents due to the presence of a near-surface peaty layer at Eskmeals. These compositional features influenced the porewater composition and indeed the associations of U (and DU). In general, at Dundrennan, U was split between large (100 kDa-0.2 {mu}m) and small (3-30 kDa) organic colloids whilst at Eskmeals, U was mainly in the small colloidal and truly dissolved fractions. Especially below 10 cm depth, association with large Fe/Al/organic colloids was considered to be a precursor to the removal of U from the Dundrennan porewaters to the solid phase. In contrast, the association of U with small organic colloids was largely responsible for inhibiting attenuation in the Eskmeals soils. Lateral migration of U (and DU) through near-surface Dundrennan soils will involve both large and small colloids but, at depth, transport of the smaller amounts of U remaining in the porewaters may involve large colloids only. For one of the Dundrennan cores the importance of redox-related processes for the re-mobilisation of DU was also indicated as Mn{sup IV} reduction resulted in the release of both Mn{sup II} and U{sup VI

  9. Knowledge based expert system to minimise environmental pollution in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd; Desa, Mohamad Nor Mohamad [Civil Engineering, Universiti Tenaga Nasional, Kajang, Selangor (Malaysia); Basri, Noor Ezlin Ahmad [Civil Engineering, Universiti Tenaga Nasional, Kajang, Selangor (Malaysia)

    2011-07-01

    Construction activities generate enormous amount of erosion and sediments sediments that is the result of soil disturbance during construction activities, thus, will pollute the adjacent water bodies and make it unfeasible for different uses. This paper aimed to develop and create the main features of an expert system prototype (ESCES) for minimising erosion and sedimentation due to stormwater generated from the construction activities by recommending a feasible BMPs. Multi criteria Analysis (MCA) technique has been integrated so as to select the best control measure among many stormwater control alternatives. A questionnaire has been distributed to the relevant experts so as to rank the stormwater control measures to be used in the MCA technique. Using Visual Basic 6, Graphical User Interfaces (GUIs) were developed. The knowledge and experience were acquired from various textural sources (i.e. guidelines, manuals, literature, and human expert). Results from this study showed that the Best Management Practices (BMPs) reommended have good suited the site characteristics. As a conclusion from this study, the ESCES can be considered as part of the 'Green Technology Tool' since it helps in protecting the environment and preserve good quality of water adjacent to the construction sites in Malaysia.

  10. The status of spent fuel storage in the UK

    International Nuclear Information System (INIS)

    Dunn, M.J.; Topliss, I.R.

    1999-01-01

    Nuclear generating capacity in the UK is static with no units currently under construction. There are three main nuclear fuel types used in the UK for Magnox reactors, AGRs and PWRs. All Magnox fuel will ultimately be reprocessed following a short period of interim storage. AGR fuel will either be reprocessed or long term stored in ponds. PWR fuel will be stored underwater at the reactor site for the foreseeable future, with no decision as yet made to its ultimate management route. (author)

  11. Risk factors for cardiovascular diseases among male workers of building construction site in Delhi

    Directory of Open Access Journals (Sweden)

    Mamta Parashar

    2017-01-01

    Full Text Available Background: Cardiovascular disease (CVD is mainly attributable to a combination of risk factors (RFs: tobacco use, alcohol use, high blood pressure, diabetes, unhealthy diet, and obesity which are amenable to interventions. Building construction workers are poor and vulnerable. They are also the victims of adverse working environmental conditions and subjected to health hazards of occupational origin. Objective: The aim was to study the RFs and associated sociodemographics for CVD among construction site workers. Materials and Methods: This cross-sectional study was conducted among construction site workers. A total of 172 male workers over the age of 18 years were included in the study. Modified World Health Organization Step-wise approach to chronic disease RF surveillance was used to collect data. The data were analyzed in SPSS version 17 and the Chi-square test was applied to analyze the qualitative data. Results: At least one RF for CVD was present in all the subjects, with majority (93.6% of them having at least two RFs. The presence of the RFs (moderate to high, 3–11 was found to be significantly associated with lower income group, unskilled workers, migration year <1, alcoholics, personal tobacco use, family history of tobacco use, and the low knowledge score regarding tobacco use (0–2. Conclusions: Community-based comprehensive behavioral and life style communication package should be established for workers to reduce the modifiable RFs of CVD.

  12. A suggested color scheme for reducing perception-related accidents on construction work sites.

    Science.gov (United States)

    Yi, June-seong; Kim, Yong-woo; Kim, Ki-aeng; Koo, Bonsang

    2012-09-01

    Changes in workforce demographics have led to the need for more sophisticated approaches to addressing the safety requirements of the construction industry. Despite extensive research in other industry domains, the construction industry has been passive in exploring the impact of a color scheme; perception-related accidents have been effectively diminished by its implementation. The research demonstrated that the use of appropriate color schemes could improve the actions and psychology of workers on site, thereby increasing their perceptions of potentially dangerous situations. As a preliminary study, the objects selected by rigorous analysis on accident reports were workwear, safety net, gondola, scaffolding, and safety passage. The colors modified on site for temporary facilities were adopted from existing theoretical and empirical research that suggests the use of certain colors and their combinations to improve visibility and conspicuity while minimizing work fatigue. The color schemes were also tested and confirmed through two workshops with workers and managers currently involved in actual projects. The impacts of color schemes suggested in this paper are summarized as follows. First, the color schemes improve the conspicuity of facilities with other on site components, enabling workers to quickly discern and orient themselves in their work environment. Secondly, the color schemes have been selected to minimize the visual work fatigue and monotony that can potentially increase accidents. Copyright © 2011 Elsevier Ltd. All rights reserved.

  13. Factors influencing unsafe behaviors and accidents on construction sites: a review.

    Science.gov (United States)

    Khosravi, Yahya; Asilian-Mahabadi, Hassan; Hajizadeh, Ebrahim; Hassanzadeh-Rangi, Narmin; Bastani, Hamid; Behzadan, Amir H

    2014-01-01

    Construction is a hazardous occupation due to the unique nature of activities involved and the repetitiveness of several field behaviors. The aim of this methodological and theoretical review is to explore the empirical factors influencing unsafe behaviors and accidents on construction sites. In this work, results and findings from 56 related previous studies were investigated. These studies were categorized based on their design, type, methods of data collection, analytical methods, variables, and key findings. A qualitative content analysis procedure was used to extract variables, themes, and factors. In addition, all studies were reviewed to determine the quality rating and to evaluate the strength of provided evidence. The content analysis identified 8 main categories: (a) society, (b) organization, (c) project management, (d) supervision, (e) contractor, (f) site condition, (g) work group, and (h) individual characteristics. The review highlighted the importance of more distal factors, e.g., society and organization, and project management, that may contribute to reducing the likelihood of unsafe behaviors and accidents through the promotion of site condition and individual features (as proximal factors). Further research is necessary to provide a better understanding of the links between unsafe behavior theories and empirical findings, challenge theoretical assumptions, develop new applied theories, and make stronger recommendations.

  14. Constructing Optimal Coarse-Grained Sites of Huge Biomolecules by Fluctuation Maximization.

    Science.gov (United States)

    Li, Min; Zhang, John Zenghui; Xia, Fei

    2016-04-12

    Coarse-grained (CG) models are valuable tools for the study of functions of large biomolecules on large length and time scales. The definition of CG representations for huge biomolecules is always a formidable challenge. In this work, we propose a new method called fluctuation maximization coarse-graining (FM-CG) to construct the CG sites of biomolecules. The defined residual in FM-CG converges to a maximal value as the number of CG sites increases, allowing an optimal CG model to be rigorously defined on the basis of the maximum. More importantly, we developed a robust algorithm called stepwise local iterative optimization (SLIO) to accelerate the process of coarse-graining large biomolecules. By means of the efficient SLIO algorithm, the computational cost of coarse-graining large biomolecules is reduced to within the time scale of seconds, which is far lower than that of conventional simulated annealing. The coarse-graining of two huge systems, chaperonin GroEL and lengsin, indicates that our new methods can coarse-grain huge biomolecular systems with up to 10,000 residues within the time scale of minutes. The further parametrization of CG sites derived from FM-CG allows us to construct the corresponding CG models for studies of the functions of huge biomolecular systems.

  15. A new algorithm for construction of coarse-grained sites of large biomolecules.

    Science.gov (United States)

    Li, Min; Zhang, John Z H; Xia, Fei

    2016-04-05

    The development of coarse-grained (CG) models for large biomolecules remains a challenge in multiscale simulations, including a rigorous definition of CG representations for them. In this work, we proposed a new stepwise optimization imposed with the boundary-constraint (SOBC) algorithm to construct the CG sites of large biomolecules, based on the s cheme of essential dynamics CG. By means of SOBC, we can rigorously derive the CG representations of biomolecules with less computational cost. The SOBC is particularly efficient for the CG definition of large systems with thousands of residues. The resulted CG sites can be parameterized as a CG model using the normal mode analysis based fluctuation matching method. Through normal mode analysis, the obtained modes of CG model can accurately reflect the functionally related slow motions of biomolecules. The SOBC algorithm can be used for the construction of CG sites of large biomolecules such as F-actin and for the study of mechanical properties of biomaterials. © 2015 Wiley Periodicals, Inc.

  16. Can the benefits of physical seabed restoration justify the costs? An assessment of a disused aggregate extraction site off the Thames Estuary, UK.

    Science.gov (United States)

    Cooper, Keith; Burdon, Daryl; Atkins, Jonathan P; Weiss, Laura; Somerfield, Paul; Elliott, Michael; Turner, Kerry; Ware, Suzanne; Vivian, Chris

    2013-10-15

    Physical and biological seabed impacts can persist long after the cessation of marine aggregate dredging. Whilst small-scale experimental studies have shown that it may be possible to mitigate such impacts, it is unclear whether the costs of restoration are justified on an industrial scale. Here we explore this question using a case study off the Thames Estuary, UK. By understanding the nature and scale of persistent impacts, we identify possible techniques to restore the physical properties of the seabed, and the costs and the likelihood of success. An analysis of the ecosystem services and goods/benefits produced by the site is used to determine whether intervention is justified. Whilst a comparison of costs and benefits at this site suggests restoration would not be warranted, the analysis is site-specific. We emphasise the need to better define what is, and is not, an acceptable seabed condition post-dredging. Crown Copyright © 2013. Published by Elsevier Ltd. All rights reserved.

  17. Exploring Language Choice and Identity Construction in "In-Between" Sites: Ethnic Media and Community Languages Schools in Australia

    Science.gov (United States)

    Rubino, Antonia; Cruickshank, Ken

    2016-01-01

    Australian research on immigrant languages has paid little attention to interactional approaches to language alternation as identity construction, and sites other than the family and the mainstream school. We argue for the need of studies that take into account a wider range of sites, in particular "community" sites, and adopt…

  18. Analysis of noise on construction sites of high-rise buildings.

    Science.gov (United States)

    Barkokébas, Béda; Vasconcelos, Bianca M; Lago, Eliane Maria G; Alcoforador, Aline Fabiana P

    2012-01-01

    In the civil construction industry sector, it has been observed that the increasing use of machines has made tasks noisier and consequently caused hearing loss and had other adverse effects on workers. The objective of this study was to identify and assess the physical risks of noise present in activities undertaken in a construction company in order to propose control measures which will contribute to the management of health and safety within the company's organization. The methodology applied was based on verifying the characteristics of exposure to noise on construction sites, from an observation of sources which generated noise and making measurements of sound pressure levels emitted by these sources. The data was then analyzed and compared with the recommended performance levels established in control measures. As a result, it was found that some machines and equipment used in civil construction often generate noise above the acceptable levels and as such, in these cases, various control measures have been proposed. It is believed that the use of management techniques is the most effective way to assess risk and to implement the preventive and corrective actions proposed, and allows for the analysis of sound pressure levels on an ongoing basis.

  19. Environmental assessment for the A-01 outfall constructed wetlands project at the Savannah River Site

    International Nuclear Information System (INIS)

    1998-10-01

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021)

  20. Proceedings of the CNRA Workshop on New Reactor Siting, Licensing and Construction Experience

    International Nuclear Information System (INIS)

    2011-01-01

    This report documents the proceedings from the 'Workshop on New Reactor Siting, Licensing and Construction Experience', held in Prague, Czech Republic on 15-17 September 2010. A total of 59 specialists from 16 countries and international organisations attended. The Meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the State Office for Nuclear Safety (SUJB) in Czech Republic. The objectives of the workshop were to review and discuss recent and past construction experience lessons learned including perspectives from regulatory authorities, as well as vendors, and licensee. The workshop addressed issues associated with project management resources including: a) overall human resources, expertise, experience and organisation available to the licensee, b) capability of each potential vendor (in-house knowledge and skills versus planned subcontracting and subcontractor management). The workshop also discussed the lessons learned in the regulation of site selection, evaluation and site preparation as well as the review of regulatory practices for the licensing of new reactors, including the regulatory body infrastructure, staffing and expertise needed. The workshop provided an excellent opportunity to communicate recent experience on these topics to a wider audience, including participants from OECD member countries as well as New Entrants from non-OECD member countries. The workshop allowed the WGRNR group to introduce and discuss the current programme of work and products under development in order to gain insights from workshop participants on each of the programme of work areas, and get feedback on additional focus areas. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to presentations of the licensing process for new reactors followed by different member countries. The second technical session was

  1. The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation

    Science.gov (United States)

    Zhadanovsky, Boris; Sinenko, Sergey

    2018-03-01

    Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.

  2. Construction management at the SP-100 ground engineering system test site

    International Nuclear Information System (INIS)

    Burchell, G.P.; Wilson, L.R.

    1991-01-01

    Contractors under the U.S. Department of Energy management have implemented a comprehensive approach to the management of design and construction of the complex facility modifications at the SP-100 Ground Engineering System Test Site on the Hanford Reservation. The SP-100 Test Site employs a multi-organizational integrated management approach with clearly defined responsibilities to assure success. This approach allows for thorough planning and analysis before the project kick off, thus minimizing the number and magnitude of problems which arise during the course of the project. When combined with a comprehensive cost and schedule/project management reporting system the problems which do occur are recognized early enough to assure timely intervention and resolution

  3. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    Scott, D.E.; Chazel, A.C.; Pechmann, J.H.K.; Estes, R.A.

    1993-06-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980's. The Savannah River Ecology Laboratory (SREL) has completed 14 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ''refuge ponds'' as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022)

  4. On-site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures

    Directory of Open Access Journals (Sweden)

    Serdar Durdyev

    2011-09-01

    Full Text Available Productivity is key to the survival and growth of any organisation, industry or nation. Some factors constrain the achievement of the set project objectives in the New Zealand building and construction industry and are responsible for the reported steady decline of productivity and performance. This study aims to identify the key constraints to on-site labour productivity and improvement measures. Using the descriptive survey method, views of some project managers, contractors and subcontractors in New Zealand were canvassed via pilot interviews and questionnaire surveys at the qualitative and quantity data gathering stages, respectively. Multi-attribute technique was used to analyse the quantitative data. Results showed that the key external constraints to on-site labour productivity comprise, in order of decreasing impact, statutory compliance, unforeseen events and wider external dynamics. The internal constraints, which contribute 67 percent of the onsite productivity issues, comprise reworks, level of skill and experience of the workforce, adequacy of method of construction, buildability issues, and inadequate supervision and coordination. . The factors underlying each broad category of external and internal constraints are reported. The relative levels of impact of the identified constraints are expected to guide the project team in addressing the constraints in a cost-effective manner.

  5. Important considerations related to the construction of observation wells in radiation facilities sites: A review research

    International Nuclear Information System (INIS)

    El-Sayed, S. A.; Salem, W. M.; Atta, E. R.

    2012-01-01

    Observation wells in radiation facility sites are considered the main sources of the required subsurface geologic and hydrogeologic data. They are the most important means to detect the radioactive and/or chemical contaminants within the ground water. Also, they are used to observe the groundwater level fluctuations and perform the different aquifer tests to understand the hydraulic properties of aquifers and the behavior of contaminants transportation. This research reviews the necessary considerations and available techniques for constructing the observation wells properly. The review process depends on the international guidelines presented in the literature and the field experience. The proper well completion is essential for the well efficiency and longevity. Three main important topics are considered and discussed briefly in this review. They are the preliminary considerations, the drilling program and the well protection procedures. The preliminary considerations included are the collection of the available geologic and hydrogeologic data and information, selection of drilling method and the legal requirements. The drilling program comprises the site preparation, drilling processes, sampling, well logging, well design, casing components and materials, gravel pack and well development. The well protection procedures include well grout, concrete slab and others requirements. Observation wells should be constructed to a high standard and should be properly maintained and protected to ensure ongoing and reliable data collection

  6. Final audit report of remedial action construction at the UMTRA Project Site, Gunnison, Colorado. Revision 0

    International Nuclear Information System (INIS)

    1996-01-01

    The final audit report for remedial action at the Gunnison, Colorado Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the U.S. Department of Energy (DOE) and the Technical Assistance Contractor (TAC); and on-site construction reviews (OSCR) performed by the U.S. Nuclear Regulatory Commission (NRC). Two radiological surveillances and four radiological audits were performed at the Gunnison site. The surveillances were performed on 16 to 19 September 1992 and 28 June to 1 July 1993. The radiological audits were performed on 4 to 7 October 1993; 13 to 16 June 1994; 19 to 22 September 1994 and 10 to 12 July 1995. The surveillances and audits resulted in 79 observations. Thirty-four of the observations raised DOE concerns that were resolved on the site or through subsequent corrective action. All outstanding issues were closed on 12 July 1995. The radiological surveillances and audits are discussed in Section 2.0 of this report. Ten QA in-process surveillances were performed at the Gunnison UMTRA Project site. The surveillances were performed on 24 to 25 September 1992, 7 to 9 July 1993, 29 October 1993, 27 to 28 June 1994, 31 October to 1 November 1994, 19 to 20 June 1 995, 20 to 21 July 1995, 17 to 18 August 1995, 20 September 1995, and 11 to 13 October 1995. The surveillances resulted in 100 observations. Six observations contained recommendations that required responses from the Remedial Action Contractor (RAC). Ninety-five observations contained a recommendation that required no response. All outstanding issues were closed on 8 January 1996. The QA in-process surveillances are discussed in Section 3.0 of this report

  7. Field studies to determine acceptable levels of contamination at former UK nuclear testing sites, Maralinga and Emu in Australia

    International Nuclear Information System (INIS)

    Davy, D.R.

    1988-01-01

    The Maralinga and Emu regions of South Australia were used between 1953 and 1961 for the UK nuclear weapon development program. Two types of trials were conducted - the major trials involved the detonation of fission weapons and the minor trials dealt with weapon design and operational safety. In 1986, as a result of the findings of the Royal Commission on Nuclear Testing in Australia, the UK and Australian governments agreed to set up a Technical Assessment Group (TAG) with one American, two Australian and two British members to review the Maralinga-Emu situation. TAG was to advise on a series of clean-up options and their associated costs and examine land-use options ranging from unrestricted use by the traditional Aboriginal land owners to options involving various degrees of administrative and physical control. In its interim report, presented in May 1986, TAG observed that the existing data base was inadequate and suggested a series of field and laboratory studies that would partly correct this situation. Six of these studies were concerned with redefining the existing levels of contamination and establishing acceptable levels of contamination for a range of land-use options. This paper discusses the rationale, organisational support, scope and experimental protocol adopted for each of the six studies

  8. A first look at roadheader construction and estimating techniques for site characterization at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Neil, D.M.; Taylor, D.L.

    1991-01-01

    The Yucca Mountain site characterization program will be based on mechanical excavation techniques for the mined repository construction and development. Tunnel Boring Machines (TBM's), Mobile Miners (MM), Raiseborers (RB), Blind Hole Shaft Boring Machines (BHSB), and Roadheaders (RH) have been selected as the mechanical excavation machines most suited to mine the densely welded and non-welded tuffs of the Topopah Springs and Calico Hills members. Heavy duty RH in the 70 to 100 ton class with 300 Kw cutter motors have been evaluated and formulas developed to predict machine performance based on the rock physical properties and the results of Linear Cutting Machine (LCM) tests done at the Colorado School of Mines (CSM) for Sandia National Labs. (SNL)

  9. Quality assurance of construction work on Dukovany nuclear power plant site

    International Nuclear Information System (INIS)

    Lachs, W.

    1983-01-01

    In order to eliminate the effects of the shrinking of concrete of the 150x70 m 2 bed slab 1 m thick, the slab was divided into 36 segments. The side walls were made of steel wire netting and the segments were concreted using the chessboard method. The second concreting was made only after the volume changes in the first concrete layer terminated. The density of the concrete of the shielding was controlled using routine methods as well as a radiometric densimeter which may be used on the building site, the technological procedure was checked by ultrasound, the surface of the concrete structures designed for epoxy coatings must be even and of uniform grain size. Volume moisture of the bed slab must be less than 4% and temperature lower than 10 degC. All deliveries, assembly and construction work must have a certificate of quality awarded after thorough tests and verification. (E.S.)

  10. Construct-level predictive validity of educational attainment and intellectual aptitude tests in medical student selection: meta-regression of six UK longitudinal studies

    Science.gov (United States)

    2013-01-01

    Background Measures used for medical student selection should predict future performance during training. A problem for any selection study is that predictor-outcome correlations are known only in those who have been selected, whereas selectors need to know how measures would predict in the entire pool of applicants. That problem of interpretation can be solved by calculating construct-level predictive validity, an estimate of true predictor-outcome correlation across the range of applicant abilities. Methods Construct-level predictive validities were calculated in six cohort studies of medical student selection and training (student entry, 1972 to 2009) for a range of predictors, including A-levels, General Certificates of Secondary Education (GCSEs)/O-levels, and aptitude tests (AH5 and UK Clinical Aptitude Test (UKCAT)). Outcomes included undergraduate basic medical science and finals assessments, as well as postgraduate measures of Membership of the Royal Colleges of Physicians of the United Kingdom (MRCP(UK)) performance and entry in the Specialist Register. Construct-level predictive validity was calculated with the method of Hunter, Schmidt and Le (2006), adapted to correct for right-censorship of examination results due to grade inflation. Results Meta-regression analyzed 57 separate predictor-outcome correlations (POCs) and construct-level predictive validities (CLPVs). Mean CLPVs are substantially higher (.450) than mean POCs (.171). Mean CLPVs for first-year examinations, were high for A-levels (.809; CI: .501 to .935), and lower for GCSEs/O-levels (.332; CI: .024 to .583) and UKCAT (mean = .245; CI: .207 to .276). A-levels had higher CLPVs for all undergraduate and postgraduate assessments than did GCSEs/O-levels and intellectual aptitude tests. CLPVs of educational attainment measures decline somewhat during training, but continue to predict postgraduate performance. Intellectual aptitude tests have lower CLPVs than A-levels or GCSEs

  11. Control and tracking arrangements for solid low-level waste disposals to the UK Drigg disposal site

    International Nuclear Information System (INIS)

    Elgie, K.G.; Grimwood, P.D.

    1993-01-01

    The Drigg disposal site has been the principal disposal site for solid low-level radioactive wastes (LLW) in the United Kingdom since 1959. It is situated on the Cumbrian coast, some six kilometers to the south of the Sellafield nuclear reprocessing site. The Drigg site receives LLW from a wide range of sources including nuclear power generation, nuclear fuel cycle activities, defense activities, isotope manufacture, universities, hospitals, general industry and clean-up of contaminated sites. This LLW has been disposed of in a series of trenches cut into the underlying clay layer of the site, and, since 1988, also into concrete lined vault. The total volume of LLW disposed of at Drigg is at present in the order of 800,000m 3 , with disposals currently approximately 25,000m 3 per year. British Nuclear Fuels plc (BNFL) owns and operates the Drigg disposal site. To meet operational and regulatory requirements, BNFL needs to ensure the acceptability of the disposed waste and be able to track it from its arising point to its specific disposal location. This paper describes the system that has been developed to meet these requirements

  12. A survey of the mechanical properties of concrete for structural purposes prepared on construction sites

    Directory of Open Access Journals (Sweden)

    R. R. J. RIBEIRO

    Full Text Available Abstract This paper aims to study the concrete dosage conditions for structural purposes in construction sitesl, and the impacts of non-compliance of structural concrete for structural safety, having as study case the city of Angicos / RN. Were analyzed the dynamic elasticity modulus, static elasticity modulus and the compressive strength of concrete samples. Was conducted to collect the survey data, a field research aiming to gather information about dosage of concrete used in the works, as well as the collection of cylindrical specimens of 150 mm diameter by 300 mm of height, prepared according to practice of those professionals. The study indicated a clear necessity to reflection on the subject, since there is no concern, or even, a lack of knowledge by the interviewed professionals regarding the care and procedures necessary for the production of concrete with satisfactory quality, once at least 50% of evaluated construction sites presented compressive strength lower than 20 MPa, minimal strength to structural concrete, as recommended by ABNT-NBR 6118:2014.

  13. A comprehensive software suite for protein family construction and functional site prediction.

    Directory of Open Access Journals (Sweden)

    David Renfrew Haft

    Full Text Available In functionally diverse protein families, conservation in short signature regions may outperform full-length sequence comparisons for identifying proteins that belong to a subgroup within which one specific aspect of their function is conserved. The SIMBAL workflow (Sites Inferred by Metabolic Background Assertion Labeling is a data-mining procedure for finding such signature regions. It begins by using clues from genomic context, such as co-occurrence or conserved gene neighborhoods, to build a useful training set from a large number of uncharacterized but mutually homologous proteins. When training set construction is successful, the YES partition is enriched in proteins that share function with the user's query sequence, while the NO partition is depleted. A selected query sequence is then mined for short signature regions whose closest matches overwhelmingly favor proteins from the YES partition. High-scoring signature regions typically contain key residues critical to functional specificity, so proteins with the highest sequence similarity across these regions tend to share the same function. The SIMBAL algorithm was described previously, but significant manual effort, expertise, and a supporting software infrastructure were required to prepare the requisite training sets. Here, we describe a new, distributable software suite that speeds up and simplifies the process for using SIMBAL, most notably by providing tools that automate training set construction. These tools have broad utility for comparative genomics, allowing for flexible collection of proteins or protein domains based on genomic context as well as homology, a capability that can greatly assist in protein family construction. Armed with this new software suite, SIMBAL can serve as a fast and powerful in silico alternative to direct experimentation for characterizing proteins and their functional interactions.

  14. Robust Segmentation of Planar and Linear Features of Terrestrial Laser Scanner Point Clouds Acquired from Construction Sites

    Science.gov (United States)

    Maalek, Reza; Lichti, Derek D; Ruwanpura, Janaka Y

    2018-01-01

    Automated segmentation of planar and linear features of point clouds acquired from construction sites is essential for the automatic extraction of building construction elements such as columns, beams and slabs. However, many planar and linear segmentation methods use scene-dependent similarity thresholds that may not provide generalizable solutions for all environments. In addition, outliers exist in construction site point clouds due to data artefacts caused by moving objects, occlusions and dust. To address these concerns, a novel method for robust classification and segmentation of planar and linear features is proposed. First, coplanar and collinear points are classified through a robust principal components analysis procedure. The classified points are then grouped using a new robust clustering method, the robust complete linkage method. A robust method is also proposed to extract the points of flat-slab floors and/or ceilings independent of the aforementioned stages to improve computational efficiency. The applicability of the proposed method is evaluated in eight datasets acquired from a complex laboratory environment and two construction sites at the University of Calgary. The precision, recall, and accuracy of the segmentation at both construction sites were 96.8%, 97.7% and 95%, respectively. These results demonstrate the suitability of the proposed method for robust segmentation of planar and linear features of contaminated datasets, such as those collected from construction sites. PMID:29518062

  15. Development opportunities for the UK offshore wind industry

    International Nuclear Information System (INIS)

    1999-01-01

    This report summarises the results of a study investigating the UK's ability to compete for the construction of offshore wind farms. The European offshore wind farm market is examined, and the UK offshore construction equipment and wind farm construction methods are analysed, and recommendations for a purpose build or modified construction vessel are presented. The appendix gives UK construction companies addresses and contact names

  16. Design and construction of landslide preventive construction at Yamasubara hydroelectric power plant site. Yamasubata hatsudensho chiten ni okeru jisuberi taisaku koji no sekkei seko ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Takase, H; Ito, M; Sakata, M [The Kyushu Electric Power Co. Inc., Fukuoka (Japan)

    1993-07-30

    This paper reports the design and construction of landslide preventive construction at the site of the Yamasubara hydroelectric power plant (with a maximum output of 40,700 kW) and the result of slope stability verification after completion of the construction. The moderate slope on top of the primary slide has sands presumed to be colluvial deposit distributed with a depth of 10 m or more, where occurrence of a secondary slip was feared as triggered by the primary slide. The power plant protective constructions consisted of concrete walls to protect the entire power plant including buildings, and falling stone protective fences installed around the surge tanks. The temporary measures were so set that groundwater levels are lowered to a level that can assure the slide safety factor of 1.0 or more by means of drain boring using the down-the-hole hammer type. The permanent protective construction used rock anchors that are superior in constructability and economy. The stability of sliding slope faces was verified to confirm effects of the protective constructions. The verification included observations of groundwater level behavior, water well-up from drain holes, and movements in the slopes. The result showed that the protective constructions have give sufficient effects. Continued slope stability control is important. 16 figs., 7 tabs.

  17. Assessment of the living and workplace health and safety conditions of site-resident construction workers in Tehran, Iran.

    Science.gov (United States)

    Mohseni, Peyman Hossein; Farshad, Ali Asghar; Mirkazemi, Roksana; Orak, Rouhangiz Jamshidi

    2015-01-01

    The purpose of this study was to assess living and workplace safety conditions of construction workers in Tehran, Iran. This cross-sectional study was conducted among 410 construction sites in a municipal area of Tehran whose municipal building permits were issued in 2011. Data on ventilation, workplace safety and hygiene were collected by direct observation and interviews with site foremen. Noise levels were estimated from 10 sound-level-meter stations in the municipality area. Lack of ventilation in the workers' rooms was abundant. Bathrooms were unhygienic and minimum requirements such as lighting and ventilation did not exist in 80% of the cases. In nearly 50% of large construction sites, sewage and garbage disposal were inappropriate. Elevator safety was poor at all sites and no measures for fall prevention were present in over 88% of active construction sites. This study showed that the mean 24-h equivalent continuous sound level Leq was over 70 dB in 80% of the sites during weekdays. The results of this study revealed poor health and safety living and working conditions of construction workers in Tehran.

  18. Three-dimensional geological modelling of anthropogenic deposits at small urban sites: a case study from Sheepcote Valley, Brighton, UK.

    Science.gov (United States)

    Tame, C; Cundy, A B; Royse, K R; Smith, M; Moles, N R

    2013-11-15

    Improvements in computing speed and capacity and the increasing collection and digitisation of geological data now allow geoscientists to produce meaningful 3D spatial models of the shallow subsurface in many large urban areas, to predict ground conditions and reduce risk and uncertainty in urban planning. It is not yet clear how useful this 3D modelling approach is at smaller urban scales, where poorly characterised anthropogenic deposits (artificial/made ground and fill) form the dominant subsurface material and where the availability of borehole and other geological data is less comprehensive. This is important as it is these smaller urban sites, with complex site history, which frequently form the focus of urban regeneration and redevelopment schemes. This paper examines the extent to which the 3D modelling approach previously utilised at large urban scales can be extended to smaller less well-characterised urban sites, using a historic landfill site in Sheepcote Valley, Brighton, UK as a case study. Two 3D models were generated and compared using GSI3D™ software, one using borehole data only, one combining borehole data with local geological maps and results from a desk study (involving collation of available site data, including ground contour plans). These models clearly delimit the overall subsurface geology at the site, and allow visualisation and modelling of the anthropogenic deposits present. Shallow geophysical data collected from the site partially validate the 3D modelled data, and can improve GSI3D™ outputs where boundaries of anthropogenic deposits may not be clearly defined by surface, contour or borehole data. Attribution of geotechnical and geochemical properties to the 3D model is problematic without intrusive investigations and sampling. However, combining available borehole data, shallow geophysical methods and site histories may allow attribution of generic fill properties, and consequent reduction of urban development risk and

  19. Ecosystem services provided by a former gravel extraction site in the uk under two contrasting restoration states

    Directory of Open Access Journals (Sweden)

    Phillip J Blaen

    2016-01-01

    Full Text Available Mineral extraction sites restored for nature conservation can provide areas of high quality habitat and enhance local biodiversity, yet the ecosystem services and associated socio-economic benefits delivered by such sites are not well understood. Here we use a combination of primary field data, benefit transfer, and visitor questionnaires to assess ecosystem services provided by a former gravel mining site restored for nature conservation. We quantify the marginal benefits accrued from the site by comparing ecosystem service delivery from the current nature conservation state to delivery under a highly plausible alternative restoration state; namely a public amenity park. Our results suggest restoration for nature conservation is associated with relatively high carbon storage, but that carbon sequestration is offset to some degree by greenhouse gas fluxes from saturated reed bed areas. We demonstrate through a zonal travel-cost method and individual interviews that restoration for nature conservation contributes to local amenity value by providing specialised wildlife viewing opportunities to visitors. Our results highlight the potential ecosystem services associated with mineral sites restored for nature conservation. Notably, this study strengthens the evidence base to support the case for biodiversity-focused restoration of these extraction sites, both to the minerals industry and governmental planners, by suggesting that such restoration strategies may play an important role in contributing to human well-being without impeding economic progress.

  20. Priority and construction sites of water storage in a watershed in response to climate change

    Science.gov (United States)

    Lin, Cheng-Yu; Zhang, Wen-Yan; Lin, Chao-Yuan

    2014-05-01

    Taiwan is located at the Eastern Asia Monsoon climate zone. Typhoons and/or convectional rains occur frequently and result in high intensity storms in the summer season. Once the detention facilities are shortage or soil infiltration rate become worse in a watershed due to land use, surface runoff is easily to concentrate and threaten the protected areas. Therefore, it is very important to examine the functionality of water storage for a watershed. The purpose of this study is to solve the issue of flooding in the Puzi Creek. A case study of Yizen Bridge Watershed, in which the SCS curve number was used as an index to extract the spatial distribution of the strength of water storage, and the value of watershed mean CN along the main channel was calculated using area-weighting method. Therefore, the hotspot management sites were then derived and the priority method was applied to screen the depression sites for the reference of management authorities in detention ponds placement. The results show that the areas of subzone A with the characteristics of bad condition in topography and soil, which results in poor infiltration. However, the areas are mostly covered with forest and are difficult to create the artificial water storage facilities. Detention dams are strongly recommended at the site of depression in the river channel to decrease discharge velocity and reduce impact from flood disaster. The areas of subzone B are mainly located at the agriculture slope land. The topographic depressions in the farmland are the suitable places to construct the farm ponds for the use of flood detention and sediment deposition in the rainy seasons and irrigation in the dry seasons. Areas of subzone C are mainly occupied the gentle slope land with a better ability in water storage due to low CN value. Farm ponds constructed in the riparian to bypass the nearby river channel can create multifunctional wetland to effectively decrease the peak discharge in the downstream during

  1. Development and Implementation of a Low-Cost ex-situ Soil Clean-up Method for Actinide Removal at the AWE Aldermaston Site, U.K

    International Nuclear Information System (INIS)

    Agnew, K.; Purdie, P.; Agnew, K.; Cundy, A.B.; Hopkinson, L.; Croudace, I.W.; Warwick, P.E.F.

    2009-01-01

    This paper details the development (and implementation) of a novel, low-cost electrokinetic soil clean-up method for treatment of Pu-labelled soil wastes at the AWE Aldermaston site, Berkshire, U.K. Nuclear weapons manufacture and maintenance, and related research and development activities, have been carried out at the Aldermaston site for over 50 years, and these historical operations have generated a number of contaminated land legacy issues, including soils which contain above background (although radiologically insignificant) specific activities of Pu. Much of the Pu-labelled soil has been removed (via soil excavation), and is held in containment units on site, prior to remediation / decommissioning. Based on initial small-scale laboratory trials examining the potential for Pu removal and directed migration under a low intensity electrical field, a two year project (funded by the former UK Department of Trade and Industry and AWE PLC) has been implemented, and is reported here, involving a focussed programme of laboratory trials followed by a full-scale field trial to examine the potential of low-cost electrokinetic techniques to reduce the activity of Pu in clay-rich site soils, and reduce site waste disposal costs. Pu (and U) exhibited relatively complex behaviour in the laboratory trials, with Pu forming mobile soluble oxy-anionic species under the high pHs generated by the electrokinetic treatment technique. Clear mobilisation of Pu and U (along with a range of other elements) was however observed, in a range of soil types. The relative efficiency of remobilization was element-dependant, and, in terms of heavy metal contaminants, radionuclides, and the stable analogues of radionuclides known to be problematic at other nuclear sites, was (from most to least mobile) Cl > Zn > Sr > U > Pu > Pb. Both Pu and U showed enhanced mobility when the low-cost soil conditioning agent citric acid was added prior to electrokinetic treatment. Full-scale field trials of

  2. HCV treatment rates and sustained viral response among people who inject drugs in seven UK sites: real world results and modelling of treatment impact.

    Science.gov (United States)

    Martin, N K; Foster, G R; Vilar, J; Ryder, S; Cramp, M E; Gordon, F; Dillon, J F; Craine, N; Busse, H; Clements, A; Hutchinson, S J; Ustianowski, A; Ramsay, M; Goldberg, D J; Irving, W; Hope, V; De Angelis, D; Lyons, M; Vickerman, P; Hickman, M

    2015-04-01

    Hepatitis C virus (HCV) antiviral treatment for people who inject drugs (PWID) could prevent onwards transmission and reduce chronic prevalence. We assessed current PWID treatment rates in seven UK settings and projected the potential impact of current and scaled-up treatment on HCV chronic prevalence. Data on number of PWID treated and sustained viral response rates (SVR) were collected from seven UK settings: Bristol (37-48% HCV chronic prevalence among PWID), East London (37-48%), Manchester (48-56%), Nottingham (37-44%), Plymouth (30-37%), Dundee (20-27%) and North Wales (27-33%). A model of HCV transmission among PWID projected the 10-year impact of (i) current treatment rates and SVR (ii) scale-up with interferon-free direct acting antivirals (IFN-free DAAs) with 90% SVR. Treatment rates varied from <5 to over 25 per 1000 PWID. Pooled intention-to-treat SVR for PWID were 45% genotypes 1/4 [95%CI 33-57%] and 61% genotypes 2/3 [95%CI 47-76%]. Projections of chronic HCV prevalence among PWID after 10 years of current levels of treatment overlapped substantially with current HCV prevalence estimates. Scaling-up treatment to 26/1000 PWID annually (achieved already in two sites) with IFN-free DAAs could achieve an observable absolute reduction in HCV chronic prevalence of at least 15% among PWID in all sites and greater than a halving in chronic HCV in Plymouth, Dundee and North Wales within a decade. Current treatment rates among PWID are unlikely to achieve observable reductions in HCV chronic prevalence over the next 10 years. Achievable scale-up, however, could lead to substantial reductions in HCV chronic prevalence. © 2014 The Authors Journal of Viral Hepatitis Published by John Wiley & Sons Ltd.

  3. Nuclear fuel reprocessing in the UK

    International Nuclear Information System (INIS)

    Allardice, R.; Harris, D.; Mills, A.

    1983-01-01

    Nuclear fuel reprocessing has been carried out on an industrial scale in the United Kingdom since 1952. Two large reprocessing plants have been constructed and operated at Windscale, Cumbria and two smaller specialized plants have been constructed and operated at Dounreay, Northern Scotland. At the present time, the second of the two Windscale plants is operating, and Government permission has been given for a third reprocessing plant to be built on that site. At Dounreay, one of the plants is operating in its original form, whilst the second is now operating in a modified form, reprocessing fuel from the prototype fast reactor. This chapter describes the development of nuclear fuel reprocessing in the UK, commencing with the research carried out in Canada immediately after the Second World War. A general explanation of the techniques of nuclear fuel reprocessing and of the equipment used is given. This is followed by a detailed description of the plants and processes installed and operated in the UK

  4. An assessment of potential hydrologic and ecologic impacts of constructing mitigation wetlands, Rifle, Colorado, UMTRA project sites

    International Nuclear Information System (INIS)

    1995-04-01

    This-assessment examines the consequences and risks that could result from the proposed construction of mitigation wetlands at the New and Old Rifle Uranium Mill Tailings Remedial Action (UMTRA) Project sites near Rifle, Colorado. Remediation of surface contamination at those sites is now under way. Preexisting wetlands at or near the Old and New Rifle sites have been cleaned up, resulting in the loss of 0.7 and 10.5 wetland acres (ac) (0.28 and 4.2 hectares [ha]) respectively. Another 9.9 ac (4.0 ha) of wetlands are in the area of windblown contamination west of the New Rifle site. The US Army Corps of Engineers (USACE) has jurisdiction over the remediated wetlands. Before remedial action began, and before any wetlands were eliminated, the USACE issued a Section 404 Permit that included a mitigation plan for the wetlands to be lost. The mitigation plan calls for 34.2 ac (1 3.8 ha) of wetlands to be constructed at the south end and to the west of the New Rifle site. The mitigation wetlands would be constructed over and in the contaminated alluvial aquifer at the New Rifle site. As a result of the hydrologic characteristics of this aquifer, contaminated ground water would be expected to enter the environment through the proposed wetlands. A preliminary assessment was therefore required to assess any potential ecological risks associated with constructing the mitigation wetlands at the proposed location

  5. On-site wastewater treatment using subsurface flow constructed wetlands in Ireland.

    Science.gov (United States)

    Gill, Laurence W; O'Luanaigh, Niall; Johnston, Paul M

    2011-01-01

    The results from an Irish EPA-funded project on the effectiveness of using constructed wetlands for treating wastewater from single households is presented, which has contributed to the design guidelines included in the new EPA Code of Practice. Three subsurface flow gravel-filled wetlands were constructed on separate sites--one to provide secondary treatment and the other two to provide tertiary treatment stages for the domestic effluent. A comprehensive analysis over three years was then conducted to provide a robust characterization of the internal dynamics of the systems, particularly with respect to N and P removal as well as evaluating the temporal water balance across the different seasons. The removal of Total N was only 29% and 30% in the secondary and tertiary treatment wetlands, respectively; particularly disappointing for the tertiary treatment process, which was receiving nitrified effluent. Studies on the (15)N stable isotope confirmed that 35% of the ammonium from the septic tank was passing straight through the process without taking part in any biogeochemical processes. However, influent N in the wetlands was shown to be biologically assimilated into organic nitrogen and then released again as soluble ammonium--so-called nitrogen "spiraling." Removal of Total P in the wetlands averaged from 28% to 45% with higher P removals measured during summer periods, although the effluent concentrations were still found to be high (> 5 mg/l on average). The phosphorus in the plant material was also analysed revealing that the annual above-ground stem matter only accounted for 1.3% to 8.4% of the annual total P-load in the wetlands. Finally, the water balance analyses showed that the mean flow discharging from both the secondary and tertiary treatment wetlands was slightly greater than the mean flow to the reed bed over the trial period, with rainfall acting to increase flows by 13% and 5%, respectively, on average in winter while just about balancing

  6. Determining Safety Inspection Thresholds for Employee Incentives Programs on Construction Sites.

    Science.gov (United States)

    Sparer, Emily; Dennerlein, Jack

    2013-01-01

    The goal of this project was to evaluate approaches of determining the numerical value of a safety inspection score that would activate a reward in an employee safety incentive program. Safety inspections are a reflection of the physical working conditions at a construction site and provide a safety score that can be used in incentive programs to reward workers. Yet it is unclear what level of safety should be used when implementing this kind of program. This study explored five ways of grouping safety inspection data collected during 19 months at Harvard University-owned construction projects. Each approach grouped the data by one of the following: owner, general contractor, project, trade, or subcontractor. The median value for each grouping provided the threshold score. These five approaches were then applied to data from a completed project in order to calculate the frequency and distribution of rewards in a monthly safety incentive program. The application of each approach was evaluated qualitatively for consistency, competitiveness, attainability, and fairness. The owner-specific approach resulted in a threshold score of 96.3% and met all of the qualitative evaluation goals. It had the most competitive reward distribution (only 1/3 of the project duration) yet it was also attainable. By treating all workers equally and maintaining the same value throughout the project duration, this approach was fair and consistent. The owner-based approach for threshold determination can be used by owners or general contractors when creating leading indicator incentives programs and by researchers in future studies on incentive program effectiveness.

  7. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado: Appendix B to Attachment 3, Lithologic logs and monitor well construction information. Final report

    International Nuclear Information System (INIS)

    1995-09-01

    This volume contains lithology logs and monitor well construction information for: NC processing site; UC processing site; and Burro Canyon disposal site. This information pertains to the ground water hydrology investigations which is attachment 3 of this series of reports

  8. Occupational health and safety issues in the informal economic segment of Pakistan: a survey of construction sites.

    Science.gov (United States)

    Ahmed, Ishfaq; Shaukat, Muhammad Zeeshan; Usman, Ahmad; Nawaz, Muhammad Musarrat; Nazir, Mian Sajid

    2018-06-01

    This research covers the current status of occupational health and safety (OHS)-related practices in the informal construction segment of Pakistan. Data were collected, through interviews, from 316 construction sites employing 3577 workers. The results of the study reveal that both employers and workers lack knowledge of OHS laws/standards and no practices of this nature are enacted at these construction sites. Alarmingly, work-related accidents, whenever they happen, are not given due attention and there is no formal injury-report system. The informal construction industry employs a huge portion of the informal workforce, and lack of OHS happens at tremendous human cost. These research findings may thus play their role in strengthening the case for reforms in the sector. This study, if properly utilized, may also enable employers of the sector by increasing their knowledge about OHS practices and, as a result, trying to offer safer environments for their workers.

  9. Analyzing the determinants of the UK consumer's engagement in Viral Marketing on Social Networking Sites : A university Student's perspective

    OpenAIRE

    Alkhateeb, Ali; Alli, Zahir; Moussa, Wissam

    2012-01-01

    Social media, especially the social networking sites (SNS) like Facebook.com, has experienced exponential growth all across the globe in the last decade. It is rapidly attracting the consumers and replacing the traditional media. Electronic word of mouth (eWOM) through social media has acquired substantial position in the marketing mix as well as integrated marketing communication of the business organizations. This research aimed at analyzing different social relationship factors or determin...

  10. Survey of gaseous air pollutants at selected UK sites: XXI. Data digest for Cromwell Road, London, 1984

    Energy Technology Data Exchange (ETDEWEB)

    Broughton, G.F.J.; Bower, J.; Drury, V.J.; Lilley, K.; Powell, K.

    1987-01-01

    Ambient air-quality measurements of four gaseous pollutants plus black smoke and particulate lead continued during 1984 at the Cromwell Road kerbside site sponsored by the Department of the Environment. These data are presented here in the form of frequency distributions, averages, and other parameters for winter, summer, annual and monthly periods. Time-series graphs of pollutant concentrations for 1984 and of the historical data base between March 1973 and December 1984 are also included.

  11. UK retail marketing survey 94

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This document draws together data on the United Kingdom (UK) petroleum market up to the end of 1993. Lists include suppliers of petrol to the UK market listed by brand name, a regional breakdown of petrol and derv outlets, UK outlets which retail derv. Average retail prices for motor spirit and derv per litre are given as are sites fitted with Vapour Recovery equipment. Other tables shown indicate various companies' share of the market in terms of the percentage of petrol sites, including supermarkets. The volumes of motor spirit and derv delivered to retail and commercial customers between 1984 and 1993 is also given. (UK)

  12. Mechanisms controlling lateral and vertical porewater migration of depleted uranium (DU) at two UK weapons testing sites.

    Science.gov (United States)

    Graham, Margaret C; Oliver, Ian W; MacKenzie, Angus B; Ellam, Robert M; Farmer, John G

    2011-04-15

    Uranium associations with colloidal and truly dissolved soil porewater components from two Ministry of Defence Firing Ranges in the UK were investigated. Porewater samples from 2-cm depth intervals for three soil cores from each of the Dundrennan and Eskmeals ranges were fractionated using centrifugal ultrafiltration (UF) and gel electrophoresis (GE). Soil porewaters from a transect running downslope from the Dundrennan firing area towards a stream (Dunrod Burn) were examined similarly. Uranium concentrations and isotopic composition were determined using Inductively Coupled Plasma-Mass Spectrometry (ICP-MS) and Multi-Collector-Inductively Coupled Plasma-Mass Spectrometry (MC-ICP-MS), respectively. The soils at Dundrennan were Fe- and Al-rich clay-loam soils whilst at Eskmeals, they were Fe- and Al-poor sandy soils; both, however, had similar organic matter contents due to the presence of a near-surface peaty layer at Eskmeals. These compositional features influenced the porewater composition and indeed the associations of U (and DU). In general, at Dundrennan, U was split between large (100kDa-0.2μm) and small (3-30kDa) organic colloids whilst at Eskmeals, U was mainly in the small colloidal and truly dissolved fractions. Especially below 10cm depth, association with large Fe/Al/organic colloids was considered to be a precursor to the removal of U from the Dundrennan porewaters to the solid phase. In contrast, the association of U with small organic colloids was largely responsible for inhibiting attenuation in the Eskmeals soils. Lateral migration of U (and DU) through near-surface Dundrennan soils will involve both large and small colloids but, at depth, transport of the smaller amounts of U remaining in the porewaters may involve large colloids only. For one of the Dundrennan cores the importance of redox-related processes for the re-mobilisation of DU was also indicated as Mn(IV) reduction resulted in the release of both Mn(II) and U(VI) into the truly

  13. Erodibility of waste (Loess) soils from construction sites under water and wind erosional forces.

    Science.gov (United States)

    Tanner, Smadar; Katra, Itzhak; Argaman, Eli; Ben-Hur, Meni

    2018-03-01

    Excess soils from construction sites (waste soils) become a problem when exposed to soil erosion by water or wind. Understanding waste soil erodibility can contribute to its proper reuse for various surface applications. The general objective of the study was to provide a better understanding of the effects of soil properties on erodibility of waste soils excavated from various depths in a semiarid region under rainfall and wind erosive forces. Soil samples excavated from the topsoil (0-0.3m) and subsoil layers (0.3-0.9 and >1m depths) were subjected to simulated rainfall and wind. Under rainfall erosive forces, the subsoils were more erodible than the topsoil, in contrast to the results obtained under wind erosive forces. Exchangeable sodium percentage was the main factor controlling soil erodibility (K i ) under rainfall, and a significant logarithmic regression line was found between these two parameters. In addition, a significant, linear regression was found between K i and slaking values for the studied soil samples, suggesting that the former can be predicted from the latter. Soil erodibility under wind erosion force was controlled mainly by the dry aggregate characteristics (mean weight diameter and aggregate density): their higher values in the subsoil layers resulted in lower soil erodibility compared to the topsoil. Copyright © 2017 Elsevier B.V. All rights reserved.

  14. Industrial hygiene survey report of Millstone Nuclear Power Station No. 3 construction site, Waterford, Connecticut

    International Nuclear Information System (INIS)

    Zaebst, D.D.; Herrick, R.

    1985-11-01

    Personal and area air samples were analyzed for total dust, organic solvent vapors, and metals during spray, brush, and roller painting and paint removal operations at Millstone Nuclear Power Station Number 3 construction site, Waterford, Connecticut, March 1981. Solvent exposures were generally well below their relevant standards. Total dust exposures during paint removal ranged up to 1,000 milligrams per cubic meter (mg/m3) in the containment building. The OSHA standard for total dust is 15mg/m3. Exposures to lead dusts exceeded the OSHA standard of 0.05mg/m3 in the turbine, auxiliary, and containment buildings. Chromium exposures were generally below the OSHA standard of 1mg/m3, except for 2.4mg/m3 in a personal sample taken during paint removal in the containment building. Very few engineering controls other than 3M single use respirators were observed. The authors note that the chromium exposure data is difficult to interpret as the form of the chromium is not known. If the chromium existed as hexavalent chromium exposure was excessive. The authors conclude that in view of the measured exposures to total dust, lead, and chromium, engineering controls and respiratory protection are inadequate. Recommendations include implementing better controls and respiratory protection

  15. Design of NPP of new generation being constructed at Novovoronezh NPP site

    International Nuclear Information System (INIS)

    Afrov, A.; Berkovich, V.; Generalov, V.; Dragunov, Yu.; Krushelnitskij, V.

    2000-01-01

    The design of a new-generation nuclear power plant with advanced WWER-1000 units, currently under construction at Novovoronezh, is dealt with in considerable detail. Information is given on the general layout of the power plant, and the monoblock comprising the four-loop reactor plant with double containment, the turbine hall with two turbine-driven feedwater pumps and safety and auxiliary systems is described. In a separate building at the power plant site, a new fuel storage facility is located designed for extreme external effects. The operations involved in fuel handling, in both the storage facility and the reactor department, are mentioned. The management of various types of radioactive waste is highlighted. The basic principles of the engineering solutions pertaining to the plant's electrical part are outlined. The concept of the instrumentation and control system is explained. Information is also given on the double containment system. A considerable part of the presentation is devoted to the philosophy and concept of the power plant safety, to the results of safety evaluation and to the research carried out in this respect. The paper is concluded with a discussion of the experiments and analyses performed with the aim to justify the design solutions as regards the passive heat removal system. (A.K.)

  16. Effect of corrosive marine atmosphere on construction materials in Tanzania: Exposure sites and preliminary results

    International Nuclear Information System (INIS)

    Mmari, A.G.; Uiso, C.B.S.; Makundi, I.N.; Potgieter-Vermaak, S.S.; Potgieter, J.H.; Van Grieken, R.

    2007-01-01

    Air pollution studies in Africa are limited and the influence of ambient air quality on buildings and constructions have not been investigated in the larger part of Sub-Saharan Africa. The increasing burden of emission from industry, traffic and coal power plants on ambient air pollution in Sub-Saharan Africa necessitated reviewing previous and current studies. In South Africa a 20-year exposure program, focusing on the effect of ambient exposure on various metals and alloys, showed that the amount of rainfall, relative humidity, atmospheric pollution, wind speed, solar radiation and structural design are some of the factors controlling atmospheric corrosion. Tanzania, being among the Sub-Saharan African countries and partly bordered by Indian ocean, the main source of marine atmosphere, experiences corrosive degradation on metal roofing and cementitious materials. This paper describes the exposure site set-up and will report on some preliminary results of air quality and its relation with the meteorological conditions, as well as surface changes observed, for the year one of exposure. These will thereafter be compared to the completed European and Asian studies, as reported by CLRTAP and RAPIDC respectively. (author)

  17. Strategy for energy policy in the UK

    International Nuclear Information System (INIS)

    Stone, T.

    2012-01-01

    UK Energy Policy is leading the world in showing how governments can effectively respond to the now widely accepted challenges of security of supply, low-carbon generation and pragmatic implementation. Confidence in the UK as place to invest in new nuclear is very high-there are already 3 developers who have between them already invested over 1 billion, 5 sites are planned to be developed and between 10 and 12 new reactors are planned to be built. To be clear, this is by far the largest commitment to new nuclear in the Western World and swamps in other countries. This achievement is a combination of vision, continuity, political consensus and a group of ministers and officials who are clear in the goals for the long-term sustain ability of an energy policy that will dramatically affect the lives of many generations to come. Recognising the multi-generational obligations and consequences of government policy's key to ensuring that this investment continues, together with the maintenance of the trust that investors have developed in the management of energy policy by the UK government. There is no doubt in the commitment of the UK government to delivering the safe, secure and low-carbon energy future of the UK. The opportunities for businesses and high-quality job creation are undoubted-all that now has to happen is for developers, reactor vendors, construction companies and communities to show how they can together deliver the cheapest form of low-carbon base load to time and to cost and to the benefit of local communities and the UK economy. the world is watching for the UK to show how it can be done. (Author)

  18. Berlin Brandenburg International (BER: planning and implementation of a concrete supply chain for the airport construction site

    Directory of Open Access Journals (Sweden)

    Guido Riedel

    2012-12-01

    Full Text Available Background: With the decision to extend the airport Berlin-Schönefeld to the new airport Berlin Brandenburg International (BER in 2006, a construction of superlatives has emerged. One of the biggest challenges was the supply of around 2.5 million cubic meters of high quality concrete that had to be produced for the construction of the airport. Due to the scale of this enterprise as well as its environment, the logistic solution of raw material supply has to be found.       Method: The planning of the concrete supply chain for the airport construction site BER had to be carried out with two major goals: the stability of the supply chain to assure that the demands of the construction site are met and delays are prevented, as well as assurance of the high quality standards of the concrete production and to avoid an alkali silica reaction and the resulting unavoidable disaggregation of the concrete. External effects, such as the carbon dioxide emission and the effect of the supply chain on adjoining residents were key factors that had to be integrated in a holistic supply chain concept.  The principle underlying method is an analysis of limiting conditions for two approaches: a centralized supply chain with on-site concrete factory and upstream transport of raw materials versus a decentralized supply chain with off-site factories and downstream transport of ready-mixed concrete. Results: The analysis of constraints and the effects on key requirements of the concrete supply chain for the BER airport construction site lead to the installation of the most modern concrete plant in Europe. The benefits of a centralized supply chain are significant. On one hand, the high quality standards can be met with the on-site mixture of the concrete and centralized quality assurance, on the other hand, the majority of the supply traffic for the construction site was moved from the road to train-bound logistics, meeting the emission requirements of the

  19. Application of a Coupled Eulerian-Lagrangian Technique on Constructability Problems of Site on Very Soft Soil

    Directory of Open Access Journals (Sweden)

    Junyoung Ko

    2017-10-01

    Full Text Available This paper presents the application of the Coupled Eulerian–Lagrangian (CEL technique on the constructability problems of site on very soft soil. The main objective of this study was to investigate the constructability and application of two ground improvement methods, such as the forced replacement method and the deep mixing method. The comparison between the results of CEL analyses and field investigations was performed to verify the CEL modelling. The behavior of very soft soil and constructability with methods can be appropriately investigated using the CEL technique, which would be useful tools for comprehensive reviews in preliminary design.

  20. Prevalence and correlates of nicotine dependence among construction site workers: A cross-sectional study in Delhi

    Directory of Open Access Journals (Sweden)

    Mamta Parashar

    2016-01-01

    Full Text Available Introduction: Workers represent half the world′s population and are major contributors to economic and social development. Tobacco consumption in construction site workers has been considered a big challenge. Objectives: (1 To assess the prevalence of nicotine dependence among tobacco users. (2 To study the correlates of nicotine dependence among the construction site workers. Methodology: A cross sectional study was conducted using a predesigned and pretested structured proforma. The study was conducted among all construction site workers aged 18yrs and above in campus of Hamdard Institute of Medical Sciences and Research and associated HAH centenary hospital, New Delhi.Karl Fagerstrom Nicotine Dependence Questionnaire was used to assess dependence on nicotine. Results: The mean age of construction site workers was 32.04±11.6 years. Among the workers, majority (91% were tobacco user. Among the users, 60% found it difficult to refrain from smoking/chewing in places where use of tobacco is not allowed (e.g. hospitals, government offices, cinemas, Libraries etc. 55% of the users smoked or chewed tobacco during the first hours after waking than during the rest of the day. On multivariate analysis, the factors which were found to be significantly associated with nicotine dependence were lower income group (OR 2.57, CI:1.66-3.99, smokeless tobacco use (OR 2.36,CI:1.30-4.27 and lower education (OR = 2.86 (95% CI 1.97-4.16 for illiterate. Discussion: The prevalence of tobacco use (91% among construction workers is very high compared to that in the general population. Recognition of construction sites as work places and proper implementation of law is needed.

  1. The importance of cleanliness in a proper construction site management in malaysia: a contractor’s perspective

    Science.gov (United States)

    Shazwan, M. A.; Quintin, J. V.; Osman, N. A.; Suhaida, S. K.; Ma'arof, M. I. N.

    2017-11-01

    Construction site’s cleanliness and tidiness is one of top main concerns of construction site management. A good site management with adequate planning in regards to housekeeping will ensure safety to both the site’s working personnel and the neighbouring environment. This is especially of priority today due to the rapid growth of construction projects in Malaysia. Nevertheless, to date, statistics had shown that housekeeping related accidents happened repeatedly despite the awareness on site’s cleanliness and tidiness. The objective of this study was to explore constructor’s perspective on site cleanliness and tidiness. A set of questionnaire was distributed to thirty-four (34) Grade 7 CIDB contractors’ firms in Petaling Jaya. Petaling Jaya was chosen since this area are developed area covered with residential area and cleaning management an importance issues. The goals of the survey study were to identify the following items from the perception of the contractors: (i) the hierarchy of importance of several purposes in ensuring construction site’s cleanliness and tidiness, and (ii) the risk factors that influence a construction site’s level of cleanliness and tidiness. It was found that from the contractor’s perspective, ensuring a site cleanliness and tidiness is of importance mainly due to the need in protecting the environment, whilst, the least in cost saving. In addition, poor personnel’s working attitude was found to be the main risk factor that will influences a construction site’s level of cleanliness and tidiness. Conclusively, construction site’s cleanliness and tidiness is highly vital. Even so, for nationwide awareness on the topic matter will requires full cooperation from all related parties.

  2. A GIS analysis of suitability for construction aggregate recycling sites using regional transportation network and population density features

    Science.gov (United States)

    Robinson, G.R.; Kapo, K.E.

    2004-01-01

    Aggregate is used in road and building construction to provide bulk, strength, support, and wear resistance. Reclaimed asphalt pavement (RAP) and reclaimed Portland cement concrete (RPCC) are abundant and available sources of recycled aggregate. In this paper, current aggregate production operations in Virginia, Maryland, and the District of Columbia are used to develop spatial association models for the recycled aggregate industry with regional transportation network and population density features. The cost of construction aggregate to the end user is strongly influenced by the cost of transporting processed aggregate from the production site to the construction site. More than 60% of operations recycling aggregate in the mid-Atlantic study area are located within 4.8 km (3 miles) of an interstate highway. Transportation corridors provide both sites of likely road construction where aggregate is used and an efficient means to move both materials and on-site processing equipment back and forth from various work sites to the recycling operations. Urban and developing areas provide a high market demand for aggregate and a ready source of construction debris that may be processed into recycled aggregate. Most aggregate recycling operators in the study area are sited in counties with population densities exceeding 77 people/km2 (200 people/mile 2). No aggregate recycling operations are sited in counties with less than 19 people/km2 (50 people/mile2), reflecting the lack of sufficient long-term sources of construction debris to be used as an aggregate source, as well as the lack of a sufficient market demand for aggregate in most rural areas to locate a recycling operation there or justify the required investment in the equipment to process and produce recycled aggregate. Weights of evidence analyses (WofE), measuring correlation on an area-normalized basis, and weighted logistic regression (WLR), are used to model the distribution of RAP and RPCC operations relative

  3. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  4. Regulatory principles, criteria and guidelines for site selection, design, construction and operation of uranium tailings retention systems

    International Nuclear Information System (INIS)

    Coady, J.R.; Henry, L.C.

    1978-01-01

    Principles, criteria and guidelines developed by the Atomic Energy Control Board for the management of uranium mill tailings are discussed. The application of these concepts is considered in relation to site selection, design and construction, operation and decommissioning of tailings retention facilities

  5. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO

    Science.gov (United States)

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  6. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO - (Presentation)

    Science.gov (United States)

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  7. Systems Analysis, Scenario Construction and Consequence Analysis Definition for SITE-94

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, N A; Robinson, P [Intera Information Technologies Ltd (United Kingdom); Andersson, Johan; Wingefors, S [Swedish Nuclear Power Inspectorate, Stockholm (Sweden); Skagius, K; Wiborgh, M [Kemakta Konsult AB, Stockholm (Sweden); Wene, C O [Chalmers Inst. of Technology, Goeteborg (Sweden)

    1995-06-01

    SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This report uses scenario definition work as a vehicle to introduce the systems approach to performance assessment which has been developed and tested in SITE-94 and which constitutes one of the main advances made during the project. The results of the application of the methodology are presented separately, in the SITE-94 Summary Report. 40 refs, 21 figs, 12 tabs.

  8. Systems Analysis, Scenario Construction and Consequence Analysis Definition for SITE-94

    International Nuclear Information System (INIS)

    Chapman, N.A.; Robinson, P.; Andersson, Johan; Wingefors, S.; Skagius, K.; Wiborgh, M.; Wene, C.O.

    1995-06-01

    SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This report uses scenario definition work as a vehicle to introduce the systems approach to performance assessment which has been developed and tested in SITE-94 and which constitutes one of the main advances made during the project. The results of the application of the methodology are presented separately, in the SITE-94 Summary Report. 40 refs, 21 figs, 12 tabs

  9. Proposal for the award of a contract for the construction of an on-site hostel at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the construction of an on-site hostel at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the consortium BATIFLEX (GB) - BATINEG (CH), the lowest bidder, for the construction of an on-site hostel at CERN for a total amount of 5 290 000 Swiss francs, not subject to revision. However, for the reasons explained in this document, the Management wishes to request the Finance Committee to give consideration to the approval of a variant to the original specification to allow use to be made of part of an existing building for the reasons detailed in this document, at an additional cost of 350 000 Swiss francs, not subject to revision, bringing the total construction cost to 5 640 000 Swiss francs.

  10. Real-time safety risk assessment based on a real-time location system for hydropower construction sites.

    Science.gov (United States)

    Jiang, Hanchen; Lin, Peng; Fan, Qixiang; Qiang, Maoshan

    2014-01-01

    The concern for workers' safety in construction industry is reflected in many studies focusing on static safety risk identification and assessment. However, studies on real-time safety risk assessment aimed at reducing uncertainty and supporting quick response are rare. A method for real-time safety risk assessment (RTSRA) to implement a dynamic evaluation of worker safety states on construction site has been proposed in this paper. The method provides construction managers who are in charge of safety with more abundant information to reduce the uncertainty of the site. A quantitative calculation formula, integrating the influence of static and dynamic hazards and that of safety supervisors, is established to link the safety risk of workers with the locations of on-site assets. By employing the hidden Markov model (HMM), the RTSRA provides a mechanism for processing location data provided by the real-time location system (RTLS) and analyzing the probability distributions of different states in terms of false positives and negatives. Simulation analysis demonstrated the logic of the proposed method and how it works. Application case shows that the proposed RTSRA is both feasible and effective in managing construction project safety concerns.

  11. Sustainable materials: issues in implementing resource efficiency – A UK policy & planning perspective

    OpenAIRE

    Odeleye, Dellé; Menzies, Brian

    2010-01-01

    Increasing the recovery of construction and demolition wastes, and the use of sustainable materials in construction is dependent on a range of drivers that influence design and project planning decisions, as well as mainstream practice on construction sites. In the absence of sustainable materials standards in UK Building Regulations, behaviour is influenced by a combination of sustainability assessment ratings (e.g. BREEAM and the Code for Sutainable Homes), waste regulations, landfill taxes...

  12. A comparative study of floor construction on sloping sites: an analysis of cumulative energy demand and greenhouse gas emissions

    Directory of Open Access Journals (Sweden)

    Grace Ding

    2016-03-01

    Full Text Available In order to make environmentally aware decisions, there is growing interest in the comparative energy and greenhouse gas (GHG performance of competing construction methods. Little research has been done concerning competing ground floor construction methods, especially given different site variables, such as slope and soil type. A life cycle assessment approach was adopted to analyse environmental impacts, including cumulative energy demand and GHG emissions for detached housing construction in Australia. Data was drawn from 24 case study housing projects, including 12 reinforced concrete and 12 suspended timber floor projects. The data presented in the paper compares cumulative energy demand, GHG and the constituent parts of competing construction methods. The findings indicate that the timber floors use/create significantly less cumulative energy demand and GHG emissions than concrete floors—approximately 2.1 to 2.7 times less energy and 2.3 to 2.9 times less GHG. These findings are limited to the site slope and foundation soil types identified in the paper. The main application of the work is in guidance concerning the lowest environmental impact options for detached housing construction.

  13. Siting, design and construction of a deep geological repository for the disposal of high level and alpha bearing wastes

    International Nuclear Information System (INIS)

    1990-06-01

    The main objective of this document is to summarize the basic principles and approaches to siting, design and construction of a deep geological repository for disposal of high level and alpha bearing radioactive wastes, as commonly agreed upon by Member States. This report is addressed to decision makers and technical managers as well as to specialists planning for siting, design and construction of geological repositories for disposal of high level and alpha bearing wastes. This document is intended to provide Member States of the IAEA with a summary outline for the responsible implementing organizations to use for siting, designing and constructing confinement systems for high level and alpha bearing radioactive waste in accordance with the protection objectives set by national regulating authorities or derived from safety fundamentals and standards of the IAEA. The protection objectives will be achieved by the isolation of the radionuclides from the environment by a repository system, which consists of a series of man made and natural safety barriers. Engineered barriers are used to enhance natural geological containment in a variety of ways. They must complement the natural barriers to provide adequate safety and necessary redundancy to the barrier system to ensure that safety standards are met. Because of the long timescales involved and the important role of the natural barrier formed by the host rock, the site selection process is a key activity in the repository design and development programme. The choice of the site, the investigation of its geological setting, the exploration of the regional hydrogeological setting and the primary underground excavations are all considered to be part of the siting process. 16 refs

  14. Case Study: LCA Methodology Applied to Materials Management in a Brazilian Residential Construction Site

    Directory of Open Access Journals (Sweden)

    João de Lassio

    2016-01-01

    Full Text Available The construction industry is increasingly concerned with improving the social, economic, and environmental indicators of sustainability. More than ever, the growing demand for construction materials reflects increased consumption of raw materials and energy, particularly during the phases of extraction, processing, and transportation of materials. This work aims to help decision-makers and to promote life cycle thinking in the construction industry. For this purpose, the life cycle assessment (LCA methodology was chosen to analyze the environmental impacts of building materials used in the construction of a residence project in São Gonçalo, Rio de Janeiro, Brazil. The LCA methodology, based on ISO 14040 and ISO 14044 guidelines, is applied with available databases and the SimaPro program. As a result, this work shows that there is a substantial waste of nonrenewable energy, increasing global warming and harm to human health in this type of construction. This study also points out that, for this type of Brazilian construction, ceramic materials account for a high percentage of the mass of a total building and are thus responsible for the majority of environmental impacts.

  15. Siting history and current construction status of disposal facility for low and intermediate level radioactive waste in Korea

    International Nuclear Information System (INIS)

    Sakai, Akihiro; Kikuchi, Saburo; Maruyama, Masakatsu

    2008-01-01

    Korean government decided disposal site for low and intermediate level radioactive waste (LILW), which is located at coastal area near the Wolsong nuclear power plants in Gyeong-Ju city in December. 2005, based on the result of votes of residents in four candidate sites. Since then, Korea Hydro and Nuclear Power Co., Ltd (KHNP), which is the management company of the LILW disposal facility, has carried out the preparation for construction of disposal facility and its licensing process. At the first phase, 100 thousand drums in 200 liter are planned to be disposed of in the rock cavern type disposal facility located at the depth from 80m to 130m below the sea level, and finally 800 thousand drums in 200 liter are planned to be disposed of in the site. This report shows the history of siting for the LILW disposal, the outline of design of disposal facility and current status of its construction, based on the information which was obtained mainly during our visit to the disposal site in Korea. (author)

  16. 75 FR 35901 - On-Site Completion of Construction of Manufactured Homes

    Science.gov (United States)

    2010-06-23

    ... consistent with the current 5-year requirement for DAPIA retention of approved designs and design changes... these documents at the job site; (h) Providing a copy of the final site inspection report and... reasonably be completed in the factory (e.g., fireplaces at marriage lines and designs that involve such...

  17. The Director-General visits the ATLAS construction site at Point 1

    CERN Multimedia

    Patrice Loiez

    1998-01-01

    Photo 05 : Claude Guitton (left), Project Manager for the EDF/Knight Piesold joint venture responsible for design and site supervision for LHC civil engineering at Point 1 takes the Director-General Chris Llewellyn Smith and LHC Project Leader Lyn Evans on a tour of the site.

  18. Advances and Challenges in the Implementation of DiD in Siting, Design, and Construction of Nuclear Installations in Vietnam

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, H.A., E-mail: nhanh@varans.vn [Vietnam Agency for Radiation and Nuclear Safety, Hanoi (Viet Nam)

    2014-10-15

    Vietnam is embarking on a development of a nuclear power program. The main focus is now on the initial 1000 MWe x 2 units of the nuclear power plant in Ninh Thuan province. Now, the nuclear projects of Vietnam are in the phase of siting approval and investment projects approval. The design assessment will be performed in 2013-2014; the construction and installation will be performed from now until the operating licensing is obtained in 2020-2021. With state of development of a nuclear power program in Vietnam, this paper only focuses on advances and challenges in the implementation of Defence in Depth (DID) in siting, design, and construction of nuclear installations in Vietnam. (author)

  19. Multi criteria analysis in environmental management: Selecting the best stormwater erosion and sediment control measure in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd; Desa, Mohamed Nor Mohamed [Civil Engineering, Universiti Tenga Nasional, Kajang, Selangor (Malaysia); Basri, Noor Ezlin Ahmad [Civil and Structural Engineering, Universiti Kebangsaan Malyasia, Bangi, Selangor (Malaysia)

    2011-07-01

    Malaysia located in a tropical region which is interested with a heavy rainfall through the whole seasons of the year. Construction stages usually associated with soil disturbing due to land clearing and grading activities, this combined with the tropical climate in Malaysia, will generate an enormous amount of soil to be eroded and then deposited in the adjacent water bodies. There are many kinds of mitigation measures used so as to reduce the impact of erosion and sedimentation that are generated due to the stormwater in construction sites. This paper presents the application of Multi Criteria Analysis (MCA) tool in choosing the best stormwater control measure by depending on specified criteria and criterion weight. The results obtained from the application of MCA in stormwater pollution control have many benefits to the contractors, consultants and decision makers by making them able to select the best control measure for every stage of construction.

  20. Development of MCESC software for selecting the best stormwater erosion and sediment control measure in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd [Civil Engineering Universiti Tenaga Nasional, Kajan, Selangor (Malaysia); Desa, Mohamed Nor Mohamed; Basri, Noor Ezlin Ahmad [Civil and Structural Engineering, Universiti Kebangsaan Malaysia, Bangi, Selangor (Malaysia)

    2012-07-01

    Malaysia located in a tropical region which is interested with a heavy rainfall through the whole seasons of the year. Construction stages usually associated with soil disturbing due to land clearing and grading activities, this combined with the tropical climate in Malaysia, will generate an enormous amount of soil to be eroded and then deposited into the adjacent water bodies. There are many kinds of mitigation measures used so as to reduce the impact of erosion and sedimentation that are generated due to the stormwater in construction sites. This paper aims to develop and apply Multi Criteria Analysis (MCA) software called Multi Criteria Erosion and Sediment Control (MCESC) software in which it can be applied in selecting the best stormwater control measure by depending on specified criteria and criterion weight. Visual Basic 6 was adopted as a development tool. This software can help the engineers, contractors on site and decision makers to find the best stormwater control measure in any construction site in Malaysia. Users of the MCESC software are given the opportunity to select the best stormwater control measure via expert's judgments that are built in the system or via their own expertise. MCESC software has many benefits since the experts are not always available and the consultancy is a costly issue which add further financial allocations to the project.

  1. Experimental Setup for Evaluation of the Protective Technical Measures Against the Slopes Degradation Along Linear Construction Sites

    Science.gov (United States)

    Kavka, Petr; Zumr, David; Neumann, Martin; Lidmila, Martin; Dufka, Dušan

    2017-04-01

    Soil erosion of the slopes along the linear construction sites, such as railroads, roads, pipelines or watercourses, is usually underestimated by the construction companies and controlling authorities. But under certain circumstances, when the construction site is not maintained and protected properly, a large amounts of soil may be transported from the sites to the surrounding environment during the intensive rainfall. Transported sediment, often carrying adsorbed pollutants, may reach watercourses and cause water recipient siltation and pollution. Within the applied research project we investigate ways of low cost, quick and easy technical measures that would help to protect the slopes against the splash erosion, rills development and sliding. The methodology is based on testing of various permeable covers, sheets, anchoring and patchy vegetation on a plot and hillslope scales. In this contribution we will present the experimental plot setup, consisting of large soil blocks encapsulated in the monitored steel containers and nozzle rainfall simulator. The presentation is funded by the Technological Agency of the Czech Republic (research project TH02030428) and an internal student CTU grant.

  2. Selection of adequate site location during early stages of construction project management: A multi-criteria decision analysis approach

    Science.gov (United States)

    Marović, Ivan; Hanak, Tomaš

    2017-10-01

    In the management of construction projects special attention should be given to the planning as the most important phase of decision-making process. Quality decision-making based on adequate and comprehensive collaboration of all involved stakeholders is crucial in project’s early stages. Fundamental reasons for existence of this problem arise from: specific conditions of construction industry (final products are inseparable from the location i.e. location has a strong influence of building design and its structural characteristics as well as technology which will be used during construction), investors’ desires and attitudes, and influence of socioeconomic and environment aspects. Considering all mentioned reasons one can conclude that selection of adequate construction site location for future investment is complex, low structured and multi-criteria problem. To take into account all the dimensions, the proposed model for selection of adequate site location is devised. The model is based on AHP (for designing the decision-making hierarchy) and PROMETHEE (for pairwise comparison of investment locations) methods. As a result of mixing basis feature of both methods, operational synergies can be achieved in multi-criteria decision analysis. Such gives the decision-maker a sense of assurance, knowing that if the procedure proposed by the presented model has been followed, it will lead to a rational decision, carefully and systematically thought out.

  3. Health Promotion at the Construction Work Site: The Lunch Truck Pilot Study.

    Science.gov (United States)

    Caban-Martinez, Alberto J; Moore, Kevin J; Clarke, Tainya C; Davila, Evelyn P; Clark, John D; Lee, David J; Fleming, Lora E

    2018-04-01

    The transient nature of construction work makes it difficult to conduct longitudinal worksite-based health promotion activities. As part of a workplace health assessment pilot study, we worked with a commercial lunch truck company to disseminate four types of health education materials including cancer screening, workplace injury prevention, fruit and vegetable consumption, and smoking cessation to construction workers purchasing food items from the truck during their job breaks. Two weeks following the worksite assessment, we followed up with these workers to ascertain their use of the health promotion materials. Of the 54 workers surveyed, 83% reported reviewing and sharing the cancer screening materials with their families, whereas 44% discussed the cancer screening materials with coworkers. Similar proportions of workers reviewed, shared, and discussed the other health promotion materials with their family. Lunch trucks may be an effective strategy and delivery method for educating construction workers on healthy behaviors and injury prevention practices.

  4. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and Other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA)

    Science.gov (United States)

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  5. Construction site workers' malaria knowledge and treatment-seeking pattern in a highly endemic urban area of India.

    Science.gov (United States)

    Shivalli, Siddharudha; Pai, Sudarshan; Akshaya, Kibballi Madhukeshwar; D'Souza, Neevan

    2016-03-16

    Construction sites are potential breeding places for some species of mosquitoes. Construction workers usually stay at the construction sites, thus being extremely susceptible to malaria. For malaria control, a special focus on them is warranted as they often seek treatment from unregulated, private vendors, increasing their risk of exposure to substandard drugs. To elicit the socio-demographic factors associated with comprehensive malaria knowledge (symptoms, mode of spread, and preventive measures) and treatment-seeking pattern (preferred source and type of treatment) among the construction workers in Mangaluru, India; and, to study the association among their comprehensive malaria knowledge, past suffering from malaria (within 1 year) and treatment-seeking pattern. A community based cross-sectional study was conducted in nine randomly selected construction sites of Mangaluru, a high-risk city for malaria with an annual parasite incidence of >2/1000/year, from June-September 2012. A sample size of 132 was estimated assuming at least 30% of them have satisfactory malaria knowledge, 10% absolute precision, 95% confidence level, design effect of 1.5 and 10% non-responses. A semi-structured interview schedule was used, and knowledge scores were computed. Multivariate linear (for knowledge score) and logistic regressions (for preferred source and type of treatment) were applied. One hundred and nineteen workers participated in the study (total approached-138). 85% (n = 101) of them were males. Mean knowledge score was 9.95 ± 3.19 (maximum possible score-16). The majority of them were aware of the symptoms and the mode of malaria transmission. However, workers (β = -0.281, p = 0.001), self stated malaria within 1 year (β = 0.276, p workers (AdjOR 7.21, 95% CI 2.3-22.9) and those with self stated malaria within 1 year (AdjOR 11.21, 95% CI 2.38-52.8) showed favorable treatment-seeking pattern. There is an urgent need of intensifying and streamlining of ongoing malaria

  6. The Impact of Transformational Leadership on Safety Climate and Individual Safety Behavior on Construction Sites

    Directory of Open Access Journals (Sweden)

    Yuzhong Shen

    2017-01-01

    Full Text Available Unsafe acts contribute dominantly to construction accidents, and increasing safety behavior is essential to reduce accidents. Previous research conceptualized safety behavior as an interaction between proximal individual differences (safety knowledge and safety motivation and distal contextual factors (leadership and safety climate. However, relatively little empirical research has examined this conceptualization in the construction sector. Given the cultural background of the sample, this study makes a slight modification to the conceptualization and views transformational leadership as an antecedent of safety climate. Accordingly, this study establishes a multiple mediator model showing the mechanisms through which transformational leadership translates into safety behavior. The multiple mediator model is estimated by the structural equation modeling (SEM technique, using individual questionnaire responses from a random sample of construction personnel based in Hong Kong. As hypothesized, transformational leadership has a significant impact on safety climate which is mediated by safety-specific leader–member exchange (LMX, and safety climate in turn impacts safety behavior through safety knowledge. The results suggest that future safety climate interventions should be more effective if supervisors exhibit transformational leadership, encourage construction personnel to voice safety concerns without fear of retaliation, and repeatedly remind them about safety on the job.

  7. The Impact of Transformational Leadership on Safety Climate and Individual Safety Behavior on Construction Sites.

    Science.gov (United States)

    Shen, Yuzhong; Ju, Chuanjing; Koh, Tas Yong; Rowlinson, Steve; Bridge, Adrian J

    2017-01-05

    Unsafe acts contribute dominantly to construction accidents, and increasing safety behavior is essential to reduce accidents. Previous research conceptualized safety behavior as an interaction between proximal individual differences (safety knowledge and safety motivation) and distal contextual factors (leadership and safety climate). However, relatively little empirical research has examined this conceptualization in the construction sector. Given the cultural background of the sample, this study makes a slight modification to the conceptualization and views transformational leadership as an antecedent of safety climate. Accordingly, this study establishes a multiple mediator model showing the mechanisms through which transformational leadership translates into safety behavior. The multiple mediator model is estimated by the structural equation modeling (SEM) technique, using individual questionnaire responses from a random sample of construction personnel based in Hong Kong. As hypothesized, transformational leadership has a significant impact on safety climate which is mediated by safety-specific leader-member exchange (LMX), and safety climate in turn impacts safety behavior through safety knowledge. The results suggest that future safety climate interventions should be more effective if supervisors exhibit transformational leadership, encourage construction personnel to voice safety concerns without fear of retaliation, and repeatedly remind them about safety on the job.

  8. Nuclear power plant construction and financial assistance - as regards subsidies for promotion of power plant siting

    International Nuclear Information System (INIS)

    Shindo, M.

    1983-01-01

    This paper describes the institutional framework for the granting of subsidies in particular to promote nuclear power plant construction in Japan. It also analyses the technical criteria applied and lists the type of improvements to various facilities and equipment made with such subsidies. (NEA) [fr

  9. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Science.gov (United States)

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  10. The Impact of Transformational Leadership on Safety Climate and Individual Safety Behavior on Construction Sites

    Science.gov (United States)

    Shen, Yuzhong; Ju, Chuanjing; Koh, Tas Yong; Rowlinson, Steve; Bridge, Adrian J.

    2017-01-01

    Unsafe acts contribute dominantly to construction accidents, and increasing safety behavior is essential to reduce accidents. Previous research conceptualized safety behavior as an interaction between proximal individual differences (safety knowledge and safety motivation) and distal contextual factors (leadership and safety climate). However, relatively little empirical research has examined this conceptualization in the construction sector. Given the cultural background of the sample, this study makes a slight modification to the conceptualization and views transformational leadership as an antecedent of safety climate. Accordingly, this study establishes a multiple mediator model showing the mechanisms through which transformational leadership translates into safety behavior. The multiple mediator model is estimated by the structural equation modeling (SEM) technique, using individual questionnaire responses from a random sample of construction personnel based in Hong Kong. As hypothesized, transformational leadership has a significant impact on safety climate which is mediated by safety-specific leader–member exchange (LMX), and safety climate in turn impacts safety behavior through safety knowledge. The results suggest that future safety climate interventions should be more effective if supervisors exhibit transformational leadership, encourage construction personnel to voice safety concerns without fear of retaliation, and repeatedly remind them about safety on the job. PMID:28067775

  11. A system to test the ground surface conditions of construction sites--for safe and efficient work without physical strain.

    Science.gov (United States)

    Koningsveld, Ernst; van der Grinten, Maarten; van der Molen, Henk; Krause, Frank

    2005-07-01

    Ground surface conditions on construction sites have an important influence on the health and safety of workers and their productivity. The development of an expert-based "working conditions evaluation" system is described, intended to assist site managers in recognising unsatisfactory ground conditions and remedying these. The system was evaluated in the period 2002-2003. The evaluation shows that companies recognize poor soil/ground conditions as problematic, but are not aware of the specific physical workload hazards. The developed methods allow assessment of the ground surface quality and selection of appropriate measures for improvement. However, barriers exist at present to wide implementation of the system across the industry. Most significant of these is that responsibility for a site's condition is not clearly located within contracting arrangements, nor is it a topic of serious negotiation.

  12. Construction of permanently inducible miRNA-based expression vectors using site-specific recombinases

    Directory of Open Access Journals (Sweden)

    Garwick-Coppens Sara E

    2011-11-01

    Full Text Available Abstract Background RNA interference (RNAi is a conserved gene silencing mechanism mediated by small inhibitory microRNAs (miRNAs. Promoter-driven miRNA expression vectors have emerged as important tools for delivering natural or artificially designed miRNAs to eukaryotic cells and organisms. Such systems can be used to query the normal or pathogenic functions of natural miRNAs or messenger RNAs, or to therapeutically silence disease genes. Results As with any molecular cloning procedure, building miRNA-based expression constructs requires a time investment and some molecular biology skills. To improve efficiency and accelerate the construction process, we developed a method to rapidly generate miRNA expression vectors using recombinases instead of more traditional cut-and-paste molecular cloning techniques. In addition to streamlining the construction process, our cloning strategy provides vectors with added versatility. In our system, miRNAs can be constitutively expressed from the U6 promoter, or inducibly expressed by Cre recombinase. We also engineered a built-in mechanism to destroy the vector with Flp recombinase, if desired. Finally, to further simplify the construction process, we developed a software package that automates the prediction and design of optimal miRNA sequences using our system. Conclusions We designed and tested a modular system to rapidly clone miRNA expression cassettes. Our strategy reduces the hands-on time required to successfully generate effective constructs, and can be implemented in labs with minimal molecular cloning expertise. This versatile system provides options that permit constitutive or inducible miRNA expression, depending upon the needs of the end user. As such, it has utility for basic or translational applications.

  13. Building technology on construction site of nuclear power plant at Zaporozh'e

    Energy Technology Data Exchange (ETDEWEB)

    Dusek, R; Matyas, V [Vodni Stavby, Prague (Czechoslovakia)

    1981-12-01

    Basic data and technical and economic indexes are shown for a WWER 1000 nuclear power plant being built 120 km off Zaporozh'e (USSR). The schedule of construction and the choice of the means of mechanization used for building work are reported. Discussed are building machines used, the location of assembly cranes of the main unit, the design and the building technology of the reactor part, the engine house, deisel generator station, the special operations building, the use of concrete and steel units in the building, and the procurement of materials for the construction. The knowledge gained from the building of the power plant will be applied in the CSSR in the building of 1000 MW unit power plants.

  14. Erosion and sedimentation control on roads and construction sites in the Federated States of Micronesia

    Science.gov (United States)

    Robert R. Ziemer; Walter F. Megahan

    1991-01-01

    Enclosed is the report that Walt Megahan and I prepared following our trip to States of Micronesia. As we discussed earlier, we felt that it was redundant to produce a set of guidelines for road construction since the FAO Conservation Guide 13/5 that was issued in 1989 (ISBN 92-5-102789-X) covers the subject extensively. We felt that we could best tailor this report to...

  15. Drainage filters and constructed wetlands to mitigate site-specific nutrient losses

    DEFF Research Database (Denmark)

    Kjærgaard, Charlotte; Hoffmann, Carl Christian; Iversen, Bo Vangsø

    Despite substantial efforts, the leaching of nutrients from agricultural land is still a serious and costly environmental problem in Denmark and elsewhere. The quality goals of the European Water Framework Directive (WFD) for the aquatic environment require a substantial reduction of diffuse nutr...... drainage. The project studies different approaches of implementing the filter technologies including drainage well or drainage pipe filters as well as surface-flow and sub-surface flow constructed wetlands....

  16. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  17. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    International Nuclear Information System (INIS)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures

  18. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    International Nuclear Information System (INIS)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE's satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson

  19. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    International Nuclear Information System (INIS)

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE

  20. Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site

    International Nuclear Information System (INIS)

    2003-01-01

    This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF 6 ) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF 6 stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the ''Federal Register'' (FR) on September 18, 2001 (''Federal Register'', Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF 6 conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (''United States Code'', Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (''Code of Federal Regulations'', Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF 6 conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a ''Federal Register'' Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (DandD) of the proposed conversion facility at three alternative locations within the Paducah site; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products

  1. Characterization and remediation of soil prior to construction of an on-site disposal facility at Fernald

    International Nuclear Information System (INIS)

    Hunt, A.; Jones, G.; Nelson, K.

    1998-03-01

    During the production years at the Feed Materials Production Center (FMPC), the soil of the site and the surrounding areas was surficially impacted by airborne contamination. The volume of impacted soil is estimated at 2.2 million cubic yards. During site remediation, this contamination will be excavated, characterized, and disposed of. In 1986 the US Environmental Protection Agency (EPA) and the Department of Energy (DOE) entered into a Federal Facility Compliance Agreement (FFCA) covering environmental impacts associated with the FMPC. A site wide Remedial Investigation/Feasibility Study (RI/FS) was initiated pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act, as amended by the Superfund Amendments and Reauthorization Act (CERCLA). The DOE has completed the RI/FS process and has received approval of the final Records of Decision. The name of the facility was changed to the Fernald Environmental Management Project (FEMP) to emphasize the change in mission to environmental restoration. Remedial actions which address similar scopes of work or types of contaminated media have been grouped into remedial projects for the purpose of managing the remediation of the FEMP. The Soil Characterization and Excavation Project (SCEP) will address the remediation of FEMP soils, certain waste units, at- and below-grade material, and will certify attainment of the final remedial limits (FRLs) for the FEMP. The FEMP will be using an on-site facility for low level radioactive waste disposal. The facility will be an above-ground engineered structure constructed of geological material. The area designated for construction of the base of the on-site disposal facility (OSDF) is referred to as the footprint. Contaminated soil within the footprint must be identified and remediated. Excavation of Phase 1, the first of seven remediation areas, is complete

  2. Requirements and criteria for choosing sites suitable for the construction of nuclear installations and power stations

    International Nuclear Information System (INIS)

    1978-05-01

    The present document explains the selection criteria for areas in Italy suitable for the installation of nuclear power stations to be included in the 'National Site Map' provided for in Section 23 of Act No 393 of 2 August 1975. It represents the results of a thorough investigation into the various aspects of the problem of siting nuclear power stations, at the present stage of technology, taking into account the effect of the installations on the environment and the effect of the environment on the installations. The essential aim is to demonstrate that the requirements derived from these analyses, and on which there was full consultation with the other controlling bodies of European countries (in particular, France, Great Britain and West Germany) ensure the optimum choice of areas from the point of view of safety and public health. (author)

  3. Bats and wind turbines : pre-siting and pre-construction survey protocols

    Energy Technology Data Exchange (ETDEWEB)

    Lausen, C.; Baerwald, E.; Gruver, J.; Barclay, R. [Calgary Univ., AB (Canada)

    2008-05-15

    Studies have shown that a number of bats are killed by moving wind turbine blades at wind farms throughout North America. The studies have shown that over 80 per cent of the fatalities involve migratory bat species. Hoary bats, eastern red bats, and silver-haired bats dominate the fatalities during the fall migration period. Fatality rates vary among wind energy developments. Some data suggest that fatalities are higher on nights with lower wind speeds, and increased fatalities have been associated with taller wind turbines. This report outlined pre-construction survey requirements for preventing bat fatalities at wind power plants. A pre-construction survey was recommended to achieve a representative sampling of bat activity and determine the relative risk to bats. The study suggested that monitoring data from locations across the province should be pooled to provide a better understanding of the landscape-scale patterns of bat migration. Monitoring for bats should be conducted continuously due to the sporadic nature of peaks in bat activity, the influence of temperature, moon phase, and weather variables. Sampling techniques for acoustic detection, radar tracking, and mist-netting should be implemented to determine the abundance of susceptible species and the location of migration routes. All existing meteorological towers should be used as sampling stations with bat detectors installed at ground level and near the top of the tower. Additional detector stations should be distributed throughout the wind resource area. Specialized anabat microphones should be calibrated to record bat activity. Acoustic data should be presented as total bat passes and mean passes per night and matched with corresponding meteorological data. It was concluded that pre-construction monitoring data should be gathered and made available for collaborative and cumulative research efforts. 28 refs., 1 fig.

  4. Development of the radiological protection focus in the site, design and construction of the nuclear power plant in Cuba

    International Nuclear Information System (INIS)

    Rodriguez R, J.M.

    1996-01-01

    The first nuclear station in Cuba NPP Juragua, at present in analysis for starting again the construction, under a multinational economic association, had had as main architect/engineer organization the Design Institute for Nuclear Power Stations of St. Petersburg (former LIAEP). Active participation of Cuban radiation protection specialist of Energoproyecto in the Juragua Project began at the beginning of the site selection works and continued in the design and construction stages up till now, and simultaneously our specialists have been acting as a counterpart of soviet designers, responsible for the general design of the station. Furthermore, some additional works in compliance with the latest safety requirements and the best international practices, which are described, as well as ongoing and planned work were performed. (author). 11 refs., 3 figs

  5. Environmental assessment for the construction, operation, and decommissioning of the Waste Segregation Facility at the Savannah River Site

    International Nuclear Information System (INIS)

    1998-01-01

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the construction, operation and decontamination and decommissioning (D ampersand D) of the Waste Segregation Facility (WSF) for the sorting, shredding, and compaction of low-level radioactive waste (LLW) at the Savannah River Site (SRS) located near Aiken, South Carolina. The LLW to be processed consists of two waste streams: legacy waste which is currently stored in E-Area Vaults of SRS and new waste generated from continuing operations. The proposed action is to construct, operate, and D ampersand D a facility to process low-activity job-control and equipment waste for volume reduction. The LLW would be processed to make more efficient use of low-level waste disposal capacity (E-Area Vaults) or to meet the waste acceptance criteria for treatment at the Consolidated Incineration Facility (CIF) at SRS

  6. Site selection of the construction of the system for the production of pasta in AP Vojvodina

    Directory of Open Access Journals (Sweden)

    Paunović Goran

    2017-01-01

    Full Text Available In the growing race for the market share, companies geographically position their production and office buildings according to the new business rules. In order for the company to survive in the market, it is necessary to maximize the profit, minimize the costs, maintain a good quality of the product and constantly improve it. The choice of location is one of the vital decisions in the process of building of a production system, although the selection of the location is a problem related to certain time sections in the life of a given production system, the need for research on the effect locations have is stable in time. The aim of the research is the methodological approach to the selection criteria of broader and narrower location for the construction of the production system for pastry production in Vojvodina as an area which has a rich base in raw material. The Agricultural and food industry as branches of industry have a long time tradition as well as a great potential in strengthening economic performances of the Economy of Vojvodina. Evaluation criteria and their use in the model of dimensional analysis will allow a good selection of a good location for the construction of the business systems for the production of pastry.

  7. Proposed training program for construction personnel involved in remedial action work at sites contaminated by naturally occurring radionuclides

    International Nuclear Information System (INIS)

    Berven, B.A.; Goldsmith, W.A.; Haywood, F.F.; Schiager, K.J.

    1979-01-01

    Many sites used during the early days of the US atomic energy program are contaminated with radionuclides of the primordial decay chains (uranium, thorium, and actinium series). This contamination consists of residues resulting from refining and processing uranium and thorium. Preparation of these sites for release to unrestricted private use will involve the assistance of construction workers, many of whom have limited knowledge of the hazards associated with radioactive materials. Therefore, there is a need to educate these workers in the fundamentals of radioactive material handling to minimize exposures and possible spread of contamination. This training should disseminate relevant information at an appropriate educational level and should instill a cautious, common-sense attitude toward the handling of radioactive materials. The training should emphasize basic information concerning environmental radiation within a context of relative risk. A multi-media format, including colorful visual aids, demonstration, and discussion, should be used to maximize motivation and retention. A detailed, proposed training program design is presented

  8. Design and Construction of Deinococcus Radiodurans for Biodegradation of Organic Toxins at Radioactive DOE Waste Sites

    International Nuclear Information System (INIS)

    Daly, Michael J.; Wackett, Lawrence P.; Fredrickson, James K.

    2001-01-01

    Seventy million cubic meters of ground and three trillion liters of groundwater have been contaminated by leaking radioactive waste generated in the United States during the Cold War. A cleanup technology is being developed based on the extremely radiation resistant bacterium Deinococcus radiodurans that is being engineered to express bioremediating functions. Research aimed at developing D. radiodurans for organic toxin degradation in highly radioactive waste sites containing radionuclides, heavy metals, and toxic organic compounds was started by this group.Work funded by the existing grant has already contributed to eleven papers on the fundamental biology of D. radiodurans and its design for bioremediation of highly radioactive waste environments

  9. Construction of an Unmarked Zymomonas mobilis Mutant Using a Site-Specific FLP Recombinase

    Directory of Open Access Journals (Sweden)

    Shao-Lan Zou

    2012-01-01

    Full Text Available Flippase expression was carried out in Zymomonas mobilis strain ZM4. The FRT-flanked selection marker gene was first integrated into the ZM4 chromosome by homologous recombination. The Saccharomyces cerevisiae flp gene was then introduced under the control of the ZM4 gap gene promoter (Pgap, encoding glyceraldehyde-3-phosphate dehydrogenase or the λ bacteriophage cI857-pR contained in the broad-host-range cloning vector pBBR1-MCS-2. This study demonstrated that flp was expressed and that the deletion frequency of the FRT-flanked marker gene was very high (approx. 100 %. In addition, the flp gene expression vector could be conveniently removed from the resulting unmarked Z. mobilis mutants by serially transferring the cells three times into antibiotic-free medium, thereby establishing an efficient method for constructing unmarked Z. mobilis mutants.

  10. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site. FY 1989--1990 annual report

    Energy Technology Data Exchange (ETDEWEB)

    Pechmann, J.H.K.; Scott, D.E.; McGregor, J.H.; Estes, R.A.; Chazal, A.C.

    1993-02-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980`s. The Savannah River Ecology Laboratory (SREL) has completed 12 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ``refuge ponds`` as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10CFR1022).

  11. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY-1991 and FY-1992

    Energy Technology Data Exchange (ETDEWEB)

    Scott, D.E.; Chazel, A.C.; Pechmann, J.H.K.; Estes, R.A.

    1993-06-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980`s. The Savannah River Ecology Laboratory (SREL) has completed 14 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ``refuge ponds`` as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022).

  12. Draft environmental impact statement siting, construction, and operation of New Production Reactor capacity. Volume 4, Appendices D-R

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.

  13. Constructing sites at a large scale - towards new design (education) methods

    DEFF Research Database (Denmark)

    Braae, Ellen Marie; Tietjen, Anne

    2010-01-01

    of the design disciplines within the development of our urban landscapes. At the same time, urban and landscape designers are confronted with new methodological problems. Within a strategic transformation perspective the formulation of the design problem or brief becomes an integrated part of the design process......Since the 1990s the regional scale has regained importance in urban and landscape design. In parallel, the focus in design tasks has shifted from master plans for urban extension to strategic urban transformation projects. The current paradigm of planning by projects reinforces the role....... This paper discusses new design (education) methods based on a relational concept of urban sites and design processes using the actor-network-theory as theoretical frame....

  14. Construct Validity of the Wechsler Intelligence Scale for Children-Fourth UK Edition with a Referred Irish Sample: Wechsler and Cattell-Horn-Carroll Model Comparisons with 15 Subtests

    Science.gov (United States)

    Canivez, Gary L.; Watkins, Marley W.; Good, Rebecca; James, Kate; James, Trevor

    2017-01-01

    Background: Irish educational psychologists frequently use the Wechsler Intelligence Scale for Children-Fourth UK Edition (WISC-IV[superscript UK]; Wechsler, 2004, Wechsler Intelligence Scale for Children-Fourth UK Edition, London, UK, Harcourt Assessment) in clinical assessments of children with learning difficulties. Unfortunately, reliability…

  15. Critical Success Factors for Public Private Partnerships in the UAE Construction Industry- A Comparative Analysis between the UAE and the UK

    Directory of Open Access Journals (Sweden)

    Khalid Almarri

    2017-01-01

    Full Text Available Procurement instruments by Public Private Partnerships (PPP have shown their amazing capacity in procuring public works from around the globe. Their success rate has been immense as they are known to bring efficiency, quality, innovation, experience, funds, and most importantly, the art of risk sharing to developed projects. This research aims to pinpoint the critical success factors (CSFs that are needed to implement PPPs in transitional economies. We have taken UAE as a case study and will be comparing its results with that of the UK’s; a developed country. Relevant data was collected through a questionnaire to establish the PPP critical success factors for the each of the two countries. In this questionnaire, data was collected from 30 participants residing in the UAE and 62 participants residing in the UK. A comparative analysis between the results of the UK and UAE showed a great deal of similarity between the two in PPP practice trends in the critical success factors. Both countries ranked the same nine factors as the most significant ones out of the eighteen critical success factors for implementing PPPs. These factors were commitment of public and private parties, appropriate risk allocation, committed and competent public agency, transparent procurement process, strong private consortium, competitive procurement process, political support, detailed cost/benefits assessment, and good governance. Whereas, the major differences were related to local financial market, macro-economic conditions, and favourable legal framework. The findings were validated through a small sample of practitioners using the Partnering Performance Index, and were found to be comprehensive, objective, reliable, practical, replicable, and adaptable.

  16. Sizewell: UK power demand

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    The Sizewell Inquiry was about whether the next power stations to be built in the UK should be nuclear or coal and, if nuclear, PWRs or AGRs. During the period of the Inquiry forecasts of demand for electricity were low. Now, however, it seems that the forecast demand is much increased. This uncertainty in demand and the wide regional variations are examined in some detail. Facts and figures on electricity sales (area by area) are presented. Also the minutes of supply lost per consumer per year. These show that security of supply is also a problem. It is also shown that the way electricity is used has changed. Whilst electricity generation has been changing to large-scale, centralised power stations the demand patterns may make smaller scale, quickly-constructed units more sensible. The questions considered at the Sizewell Inquiry may, indeed, no longer be the right ones. (UK)

  17. Radon exhalation of hardening concrete: monitoring cement hydration and prediction of radon concentration in construction site.

    Science.gov (United States)

    Kovler, Konstantin

    2006-01-01

    The unique properties of radon as a noble gas are used for monitoring cement hydration and microstructural transformations in cementitious system. It is found that the radon concentration curve for hydrating cement paste enclosed in the chamber increases from zero (more accurately - background) concentrations, similar to unhydrated cement. However, radon concentrations developed within 3 days in the test chamber containing cement paste were approximately 20 times higher than those of unhydrated cement. This fact proves the importance of microstructural transformations taking place in the process of cement hydration, in comparison with cement grain, which is a time-stable material. It is concluded that monitoring cement hydration by means of radon exhalation method makes it possible to distinguish between three main stages, which are readily seen in the time dependence of radon concentration: stage I (dormant period), stage II (setting and intensive microstructural transformations) and stage III (densification of the structure and drying). The information presented improves our understanding of the main physical mechanisms resulting in the characteristic behavior of radon exhalation in the course of cement hydration. The maximum value of radon exhalation rate observed, when cement sets, can reach 0.6 mBq kg(-1) s(-1) and sometimes exceeds 1.0 mBq kg(-1) s(-1). These values exceed significantly to those known before for cementitious materials. At the same time, the minimum ventilation rate accepted in the design practice (0.5 h(-1)), guarantees that the concentrations in most of the cases will not exceed the action level and that they are not of any radiological concern for construction workers employed in concreting in closed spaces.

  18. Cross-site comparison of ribosomal depletion kits for Illumina RNAseq library construction.

    Science.gov (United States)

    Herbert, Zachary T; Kershner, Jamie P; Butty, Vincent L; Thimmapuram, Jyothi; Choudhari, Sulbha; Alekseyev, Yuriy O; Fan, Jun; Podnar, Jessica W; Wilcox, Edward; Gipson, Jenny; Gillaspy, Allison; Jepsen, Kristen; BonDurant, Sandra Splinter; Morris, Krystalynne; Berkeley, Maura; LeClerc, Ashley; Simpson, Stephen D; Sommerville, Gary; Grimmett, Leslie; Adams, Marie; Levine, Stuart S

    2018-03-15

    Ribosomal RNA (rRNA) comprises at least 90% of total RNA extracted from mammalian tissue or cell line samples. Informative transcriptional profiling using massively parallel sequencing technologies requires either enrichment of mature poly-adenylated transcripts or targeted depletion of the rRNA fraction. The latter method is of particular interest because it is compatible with degraded samples such as those extracted from FFPE and also captures transcripts that are not poly-adenylated such as some non-coding RNAs. Here we provide a cross-site study that evaluates the performance of ribosomal RNA removal kits from Illumina, Takara/Clontech, Kapa Biosystems, Lexogen, New England Biolabs and Qiagen on intact and degraded RNA samples. We find that all of the kits are capable of performing significant ribosomal depletion, though there are differences in their ease of use. All kits were able to remove ribosomal RNA to below 20% with intact RNA and identify ~ 14,000 protein coding genes from the Universal Human Reference RNA sample at >1FPKM. Analysis of differentially detected genes between kits suggests that transcript length may be a key factor in library production efficiency. These results provide a roadmap for labs on the strengths of each of these methods and how best to utilize them.

  19. Practical data collection : establishing methods and procedures for measuring water clarity and turbidity of storm water run-off from active major highway construction sites.

    Science.gov (United States)

    2014-09-12

    In anticipation of regulation involving numeric turbidity limit at highway construction sites, research was : done into the most appropriate, affordable methods for surface water monitoring. Measuring sediment : concentration in streams may be conduc...

  20. Construction of an environmental pollution map for some industrial sites using some bio-indicators

    International Nuclear Information System (INIS)

    Helalyel, M.A.M.

    2008-01-01

    The present work deals with an environmental pollution through determination of the heavy metal pollutants namely Cd,Co,Cu,Fe,Mn,Ni,Pb and Zn which are known to cause hazard to plants and animals in water, soil and plants at different sites in Helwan and El-Tibben as old industrial areas and Toshki as pre-industrial area. In addition to, study physico-parameters of water, major anions and major cations. The thesis is divided into four main chapters (introduction, experimental, results and discussion, and comparison between Toshki, Helwan and el-Tibben)in addition to summary and conclusion, references, abstract and arabic summary. The first chapter of the thesis comprises the general introduction, which gives introduction on the subject under investigation . Also contains a brief account on the environmental pollution of water, soil and plants in addition to the impact of industrial pollution in egypt , previous work on heavy metal pollutants then the characteristic of the investigated heavy metal pollutants and natural radioactivity for the soil of the investigated areas. The second chapter contains a description of selected areas, the methodology of sampling, sample preparation for water, soil and plant and method of analysis of the selected heavy metals. The third chapter involves the results and discussion . The results revealed physico-chemical parameters measured in water samples collected from investigated areas as temperature, ph, dissolved oxygen(DO), biochemical oxygen demand (BOD) , and total alkalinity as well as determination of the major anions and cations in water samples collected from investigated areas. Heavy metals determined in water, soil and plants in addition to natural radioactivity in soil samples for each of the studied industrial cities, Helwan, el-ti been and Toshki

  1. Long-term mercury dynamics in UK soils

    International Nuclear Information System (INIS)

    Tipping, E.; Wadsworth, R.A.; Norris, D.A.; Hall, J.R.; Ilyin, I.

    2011-01-01

    A model assuming first-order losses by evasion and leaching was used to evaluate Hg dynamics in UK soils since 1850. Temporal deposition patterns of Hg were constructed from literature information. Inverse modelling indicated that 30% of 898 rural sites receive Hg only from the global circulation, while in 51% of cases local deposition exceeds global. Average estimated deposition is 16 μg Hg m -2 a -1 to rural soils, 19 μg Hg m -2 a -1 to rural and non-rural soils combined. UK soils currently hold 2490 tonnes of reactive Hg, of which 2140 tonnes are due to anthropogenic deposition, mostly local in origin. Topsoil currently releases 5.1 tonnes of Hg 0 per annum to the atmosphere, about 50% more than the anthropogenic flux. Sorptive retention of Hg in the lower soil exerts a strong control on surface water Hg concentrations. Following decreases in inputs, soil Hg concentrations are predicted to decline over hundreds of years. - Highlights: → Spatial data for mercury in UK soils can be related to past atmospheric deposition. → The residence time of Hg (c. 400 years) depends on gaseous evasion and leaching. → UK soils currently contribute more Hg 0 to the atmosphere than human activities. → Sorption of Hg by deeper soil is a strong control on surface water concentrations. - Atmospherically-deposited anthropogenic mercury, mostly of local origin, has accumulated in UK soils, and is now a significant source of Hg 0 to the global circulation.

  2. UK experience of planning the nuclear contribution to the UK power programme

    International Nuclear Information System (INIS)

    Catchpole, S.; Jenkin, F.P.

    1977-01-01

    The paper outlines U.K. experience in planning nuclear programmes. It examines the factors which have determined the size of such programmes together with those factors which have influenced their implementation. The paper also discusses the role which the utility has played in the deployment of nuclear power in the U.K. At present, nuclear energy can only be utilised on a large scale via the electricity route and the forecasting of electricity demand is therefore a key element in determining the size of the nuclear programme. Other important issues which affect the nuclear contribution are: national fuel policies, discontinuities in price and availability of imported fossil fuels, plant capital costs, fuel price relativities, plant siting, rate of introduction of new nuclear systems, manufacturer's capability, public attitudes towards nuclear power and financing. These issues are dealt with in some detail including their relative importance in the U.K. The paper also discusses the contribution of the various nuclear bodies in the U.K. in securing the implementation of the nuclear programmes. From the inception of nuclear power in the U.K., it has been recognised that a major utility has a central role to play not only in commercial operation but also in the procurement of plant and materials. As explained in the paper this ''informed buyer'' approach, which is being increasingly adopted by other major utilities, calls for an organisation and technical infrastructure far more complex than is the case for fossil plants. The requirements of safety, which is unambiguously the responsibility of the utility, and of high availability of plant operation demand a rigorous approach to design, quality assurance, project management, construction and operation. To this must be added sound research and development and staff training facilities. The paper explains how experience in these vital areas has been built up

  3. Construction of a high-density genetic map for grape using next generation restriction-site associated DNA sequencing

    Directory of Open Access Journals (Sweden)

    Wang Nian

    2012-08-01

    Full Text Available Abstract Background Genetic mapping and QTL detection are powerful methodologies in plant improvement and breeding. Construction of a high-density and high-quality genetic map would be of great benefit in the production of superior grapes to meet human demand. High throughput and low cost of the recently developed next generation sequencing (NGS technology have resulted in its wide application in genome research. Sequencing restriction-site associated DNA (RAD might be an efficient strategy to simplify genotyping. Combining NGS with RAD has proven to be powerful for single nucleotide polymorphism (SNP marker development. Results An F1 population of 100 individual plants was developed. In-silico digestion-site prediction was used to select an appropriate restriction enzyme for construction of a RAD sequencing library. Next generation RAD sequencing was applied to genotype the F1 population and its parents. Applying a cluster strategy for SNP modulation, a total of 1,814 high-quality SNP markers were developed: 1,121 of these were mapped to the female genetic map, 759 to the male map, and 1,646 to the integrated map. A comparison of the genetic maps to the published Vitis vinifera genome revealed both conservation and variations. Conclusions The applicability of next generation RAD sequencing for genotyping a grape F1 population was demonstrated, leading to the successful development of a genetic map with high density and quality using our designed SNP markers. Detailed analysis revealed that this newly developed genetic map can be used for a variety of genome investigations, such as QTL detection, sequence assembly and genome comparison.

  4. Working in the UK: Polish migrant worker routes into employment in the north east and north west construction and food processing sectors

    OpenAIRE

    Fitzgerald, Ian

    2007-01-01

    This report presents the findings of a TUC-funded project that sought to identify the main routes into employment for Polish migrant workers in the North East and North West construction and food processing sectors. Its findings show that the two sectors offer real opportunities and challenges for trade unions to organise those who most need help. Indeed many unions in the sectors have already taken up the challenge and have started to see real successes in organising groups traditionally see...

  5. Construction and operation of a tritium extraction facility at the Savannah River Site. Final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    DOE proposes to construct and operate a Tritium Extraction Facility (TEF) at H Area on the Savannah River Site (SRS) to provide the capability to extract tritium from commercial light water reactor (CLWR) targets and from targets of similar design. The proposed action is also DOE's preferred alternative. An action alternative is to construct and operate TEF at the Allied General Nuclear Services facility, which is adjacent to the eastern side of the SRS. Under the no-action alternative DOE could incorporate tritium extraction capabilities in the accelerator for production of tritium. This EIS is linked to the Final Programmatic Environmental Impact Statement for Tritium Supply and Recycling, from which DOE determined that it would produce tritium either in an accelerator or in a commercial light water reactor. The purpose of the proposed action and alternatives evaluated in this EIS is to provide tritium extraction capability to support either tritium production technology. The EIS assesses the environmental impacts from the proposed action and the alternatives, including the no action alternative

  6. Nuclear fuel reprocessing in the UK

    International Nuclear Information System (INIS)

    Allardice, R.H.; Harris, D.W.; Mills, A.

    1983-01-01

    Nuclear fuel reprocessing has been carried out on an industrial scale in the United Kingdom since 1952. Two large reprocessing plants have been constructed and operated at Windscale, Cumbria and two smaller specialized plants have been constructed and operated at Dounreay, Northern Scotland. At the present time, the second of the two Windscale plants is operating, and Government permission has been given for a third reprocessing plant to be built on that site. At Dounreay, one of the plants is operating in its original form, whilst the second is now operating in a modified form, reprocessing fuel from the prototype fast reactor. This chapter describes the development of nuclear fuel reprocessing in the UK, commencing with the research carried out in Canada immediately after the Second World War. A general explanation of the techniques of nuclear fuel reprocessing and of the equipment used is given. This is followed by a detailed description of the plants and processes installed and operated in the UK. (author)

  7. Construction and expression of hepatitis B surface antigen escape variants within the "a" determinant by site directed mutagenesis.

    Science.gov (United States)

    Golsaz Shirazi, Forough; Amiri, Mohammad Mehdi; Mohammadi, Hamed; Bayat, Ali Ahmad; Roohi, Azam; Khoshnoodi, Jalal; Zarnani, Amir Hassan; Jeddi-Tehrani, Mahmood; Kardar, Gholam Ali; Shokri, Fazel

    2013-09-01

    The antibody response to hepatitis B surface antigen (HBsAg) controls hepatitis B virus infection. The "a" determinant of HBsAg is the most important target for protective antibody response, diagnosis and immunoprophylaxis. Mutations in this area may induce immune escape mutants and affect the performance of HBsAg assays. To construct clinically relevant recombinant mutant forms of HBsAg and assessment of their reactivity with anti-HBs monoclonal antibodies (MAbs). Wild type (wt) and mutant (mt) HBsAg genes were constructed by site directed mutagenesis and SEOing PCR. The amplified genes were inserted into pCMV6-neo plasmid and transfected in CHO cell line. The expression of wt- and mtHBsAg was assessed by commercial ELISA assays and stable cells were established and cloned by limiting dilution. The recombinant mutants were further characterized using a panel of anti-HBs monoclonal antibodies (MAbs) and the pattern of their reactivity was assessed by ELISA. Ten HBsAg mutants having single mutation within the "a" determinant including P120E, T123N, Q129H, M133L, K141E, P142S, D144A, G145R, N146S and C147S together with a wt form were successfully constructed and expressed in CHO cells. Reactivity of anti-HBs MAbs with mtHBsAgs displayed different patterns. The effect of mutations on antibody binding differed depending on the amino acid involved and its location within the ''a'' determinant. Mutation at amino acids 123 and 145 resulted in either complete loss or significant reduction of binding to all anti-HBs MAbs. Our panel of mtHBsAgs is a valuable tool for assessment of the antibody response to HBV escape mutants and may have substantial implications in HBV immunological diagnostics.

  8. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY-1994 and FY-1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The Savannah River Ecology Laboratory initiated ecological studies related to the construction of the DWPF on the SRS in FY-1979. Two areas have been used for biological surveys and long-term monitoring: the DWPF construction site (S-Area and Z-Area), and two control sites (Rainbow Bay and Tinker Creek). The Rainbow Bay study area and S-Area are located within 5 km of each other on the SRS, and both once contained Carolina bays which were very similar ecologically. One goal of the SREL`s faunal studies is to compare the natural variation in amphibian populations at the Rainbow Bay control site to the variation observed at the human-altered site (Sun Bay, formerly on the DWPF construction site). Pre-construction biological surveys included data on vegetation, birds, mammals, amphibians, reptiles, fish and several invertebrate groups. No species on the Federal Endangered or Threatened lists were found on either site, but several plants and animals of threatened or special-concern status in South Carolina were present and the gopher frog (Rana areolata) currently is being considered for federal listing. Continuing studies are directed towards assessing construction impacts on the biota and towares modeling the effects of alteration of wetland hydroperiod on the biota. Primary emphasis is being paced on evaluation the effectiveness of mitigation measures undertaken by DOE.

  9. Factors determining the UK's back-end nuclear fuel cycle strategy and future nuclear systems

    International Nuclear Information System (INIS)

    Dunn, M.J.; Ainsworth, Z.E.

    2002-01-01

    Nuclear generating capacity in the UK is static with no units currently under construction. The AGRs and the UK's only PWR, Sizewell B, are operated by British Energy Generation Ltd (BEGL) and British Energy Generation (UK) Ltd (BEG(UK)L), who are subsidiaries of British Energy plc (BE) which was privatised in July 1996. Ownership of the Magnox stations, which were excluded from this privatisation, has now been transferred to BNFL.Government policy on spent fuel management in the UK is that it is for the owners of the spent fuel to decide on the appropriate spent fuel management options, based on their own commercial judgement, subject to meeting the necessary regulatory requirements. The main factors which have predominantly determined UK utility decisions on spent fuel management, to date, have been based on the technical considerations of the spent fuel characteristics, economic attractiveness of the options and at reactor site spent fuel storage capacities. To date, reprocessing has been the dominant form of spent fuel treatment in the UK. Spent fuel storage facilities consist of a mixture of at-reactor stores and large, centralised ponds associated with the reprocessing activities which take place at the Sellafield site. BEGL and BEG(UK)L have contracts for the lifetime arisings of AGR fuel which allow for all AGR spent fuel to be sent to Sellafield for reprocessing or long-term storage. The prompt reprocessing of all Magnox fuel will continue, and spent PWR fuel will continue to be stored at the reactor site in the short to medium term. It is likely that a combination of factors, which are discussed later in this paper, will continue to affect back-end nuclear fuel cycle strategy and future nuclear systems. (author)

  10. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Pwer Station

    International Nuclear Information System (INIS)

    Ueyama, Koreyasu

    1982-01-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported. (Wakatsuki, Y.)

  11. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Ueyama, Koreyasu [Tokyo Electric Power Co., Inc. (Japan)

    1982-09-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported.

  12. Products, practices and processes: exploring the innovation potential for low-carbon housing refurbishment among small and medium-sized enterprises (SMEs) in the UK construction industry

    International Nuclear Information System (INIS)

    Killip, Gavin

    2013-01-01

    Scenario-based studies agree that the technical potential for CO 2 emissions reduction from the housing stock is large. This paper explores how a market might be developed for the refurbishment activities assumed in these scenarios, taking the existing market for repair, maintenance and improvement (RMI) as its starting point. Interviews with 16 small and medium-sized enterprises (SMEs) in the construction industry reveal the interdependence of products, practices and processes in housing renovation activities. Conservative practice as well as innovation can be understood as the outcome of multi-lateral influences on firms from other firms, clients, the material buildings and products in their working lives, and from regulations and regulators. Contractors' openness to innovation is contingent on an informal approach to risk assessment, taking account of cost, time efficiency, client demands, and installer confidence in the reliability of the resulting work. The implications of the research are discussed in relation to the need for new practices and processes on refurbishment projects, raising questions for future research on key questions of quality assurance, performance over time, the application of standards, and vocational training. -- Highlights: •Repair, maintenance and improvement works are triggers for low-carbon refurbishment. •Millions of property owners and small firms make for fragmented decision-making. •Actor-Network Theory is used to frame decision-making processes for refurbishment. •Small builders can be innovative if clients allow time and money for experimentation. •Energy policy for existing homes needs to engage with the construction sector

  13. An application of the Pareto method in surveys to diagnose managers' and workers' perception of occupational safety and health on selected Polish construction sites.

    Science.gov (United States)

    Obolewicz, Jerzy; Dąbrowski, Andrzej

    2017-11-16

    The construction industry is an important sector of the economy in Poland. According to the National Labour Inspectorate (PIP) data of 2014, the number of victims of fatal accidents in the construction sector amounted to 80 as compared with 187 injured in all other sectors of economy in Poland. This article presents the results of surveys on the impact of construction worker behaviour on the occupational safety and health outcomes. The surveys took into account the point of view of both construction site management (tactical level) and construction workers (operational level). For the analysis of results, the method of numerical taxonomy and Pareto charts was employed, which allowed the authors to identify the areas of occupational safety and health at both an operational and a tactical level, in which improvement actions needed to be proposed for workers employed in micro, small, medium and large construction enterprises.

  14. Radiation dose to construction workers at operating nuclear power plant sites. Volume 2. Appendices A--F. Final report, September 1975--September 1978

    International Nuclear Information System (INIS)

    Endres, G.W.R.; Shipler, D.B.

    1978-12-01

    These appendices contain the dosimetry procedures and details of the personnel and environmental dosimeters used for the Radiation Dose to Construction Workers at Operating Nuclear Power Plant Sites Study. A printout of the computer codes used to analyze dosimeter data is included along with all the raw data obtained. Appendices C through F contain computer output and log-normal plots of dosimetry data for environmental location and construction worker groups

  15. Changes in water quality of a small urban river triggered by deep drainage of a construction site

    Directory of Open Access Journals (Sweden)

    Bartnik Adam

    2016-12-01

    Full Text Available The paper presents the results of the monitoring of the selected physicochemical properties of the Jasień River waters (in Łódź, the third biggest city of Poland and their changes under the influence of drainage of a railway station Łódź Fabryczna construction site. Even 25 years ago the Jasień River was a receiver for the sewage from the Łódź textile factories. The drainage of the excavations and disposal of the water into the Jasień River was started on January 2014 and changed stable hydrological, physical and chemical regime of the river once again. In a consequence, average monthly flows exceeded the Jasień River flow in its upper section by six times, and at the beginning by even ten times. Chloride concentration was systematically growing over the study period. This growth and higher water pH were probably associated with increasing level of contaminants in the discharged water and its gradually decreasing uptake. Average annual water temperature increased and a decrease in its amplitude was observed. The annual conductivity and pH patterns became more uniform and the changes in pH followed a clear trend of monthly changes. Water turbidity increased by two times and during summer floods this parameter was often even a few times higher than before the drainage commenced. Chlorides improved water conductance and sodium and potassium increased basicity.

  16. Does Disposing of Construction and Demolition Debris in Unlined Landfills Impact Groundwater Quality? Evidence from 91 Landfill Sites in Florida.

    Science.gov (United States)

    Powell, Jon T; Jain, Pradeep; Smith, Justin; Townsend, Timothy G; Tolaymat, Thabet M

    2015-08-04

    More than 1,500 construction and demolition debris (CDD) landfills operate in the United States (U.S.), and U.S. federal regulations do not require containment features such as low-permeability liners and leachate collection systems for these facilities. Here we evaluate groundwater quality from samples collected in groundwater monitoring networks at 91 unlined, permitted CDD landfills in Florida, U.S. A total of 460,504 groundwater sample results were analyzed, with a median of 10 years of quarterly or semiannual monitoring data per site including more than 400 different chemical constituents. Downgradient concentrations of total dissolved solids, sulfate, chloride, iron, ammonia-nitrogen, and aluminum were greater than upgradient concentrations (p < 0.05). At downgradient wells where sulfate concentrations were greater than 150 mg/L (approximately 10% of the maximum dissolved sulfate concentration in water, which suggests the presence of leachate from the landfill), iron and arsenic were detected in 91% and 43% of samples, with median concentrations of 1,900 μg/L and 11 μg/L, respectively. These results show that although health-based standards can be exceeded at unlined CDD landfills, the magnitude of detected chemical concentrations is generally small and reflective of leached minerals from components (wood, concrete, and gypsum drywall) that comprise the bulk of discarded CDD by mass.

  17. Thermal calculations for the design, construction, operation, and evaluation of the Spent Fuel Test - Climax, Nevada Test Site

    International Nuclear Information System (INIS)

    Montan, D.N.; Patrick, W.C.

    1981-01-01

    The Spent Fuel Test-Climax (SFT-C) is a test of retrievable deep geologic storage of commercially generated spent nuclear reactor fuel in granitic rock. Eleven spent fuel assemblies, together with six electrical simulators and 20 guard heaters, are emplaced 420 m below the surface in the Climax granite at the US Department of Energy Nevada Test Site. On June 2, 1978 LLNL secured funding for the SFT-C, and completed spent fuel emplacement May 28, 1980. This report documents a series of thermal calculations that were performed in support of the SFT-C. Early calculations employed analytical solutions to address such design and construction issues as drift layout and emplacement hole spacings. Operational aspects of the test required more detailed numerical solutions dealing with ventilation and guard-heater power levels. The final set of calculations presented here provides temperature histories throughout the test facility for evaluation of the response of the SFT-C and for comparison of calculations with acquired data. This final set of calculations employs the as-built test geometry and best-available material properties

  18. Selecting, engineering and constructing drilling sites at the Geysers geothermal field. Geysers chinetsu ryoiki ni okeru kussaku shikichi no sentei engineering kochiku

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This paper describes some examples of selection, engineering and construction of drilling sites at the Geysers geothermal field in the northern district of California State. Steep landform, thin-layered soil and violent rainfall create unstable conditions bringing about numerous landslide in the field. Selection of a well drilling site appropriate in such conditions is started by analyzing the aerial photographs by technical staff. After site selection, prospecting and soil test are conducted and a working plan in the well site is decided to prepare engineering drawings. In the construction, land preparation, the open-cutting of base-line trench, etc. are carried out. The base-line trench is a large and sufficiently deep one which is open-cut to the front end or the middle of the bottom part of the well plateau. The final construction work is to build a leading casing for interpolating cementing. The well site construction in the Geysers geothermal field is done in consideration of protecting human life, health and properties. 1 fig.

  19. Economic and Environmental Evaluation of a Brick Delivery System Based on Multi-Trip Vehicle Loader Routing Problem for Small Construction Sites

    Directory of Open Access Journals (Sweden)

    Heungjo An

    2018-05-01

    Full Text Available While large construction sites have on-site loaders to handle heavy and large packages of bricks, small brick manufacturers employ a truck-mounted loader or sometimes deploy a loader truck to accompany normal brick delivery trucks to small construction sites lacking on-site loaders. It may be very challenging for small contractors to manage a sustainable delivery system that is both cost-effective and environmentally friendly. To address this issue, this paper proposes to solve a multi-trip vehicle loader routing problem by uniquely planning routes and schedules of several types of vehicles considering their synchronized operations at customer sites and multi trips. This paper also evaluates the sustainability of the developed model from both economic and environmental perspectives. Case studies based on small construction sites in the Middle East demonstrate applications of the proposed model to make the most economical plans for delivering bricks. Compared to the single-trip vehicle loader routing problem, the proposed model reduces, on average, 18.7% of the total delivery cost while increasing CO2 emission negligibly. The economic benefit is mainly achieved by reducing the required number of vehicles. Brick plant managers can use the proposed mathematical model to plan the most cost-effective delivery schedules sustainably while minimizing negative environmental effects.

  20. Construction on a new deep ice coring site at Dome Fuji Station -Operations carried out by the JARE-44 Dome Fuji overwintering team-

    Directory of Open Access Journals (Sweden)

    Takao Kameda

    2005-07-01

    Full Text Available Eight members of the 44th Japanese Antarctic Research Expedition (JARE-44 stayed at Dome Fuji Station (77°19′01″S, 39°42′11″E; 3810 m a.s.l.; ice thickness 3028±15 m; mean air temperature -54.4°C; lowest air temperature -79.7°C from January 19, 2003 to January 25, 2004 for glaciological, meteorological, and upper atmospheric observations, and for construction at a new ice coring site for deep ice coring. The construction was a continuation of the activities of JARE-43; JARE-44 primarily carried out interior work at the ice coring site. The following works were carried out during the overwintering period and are described in this paper: retrieval of casing pipes from the borehole, enlargement of the borehole, insertion of casing pipes into the borehole, movement of the winch system from the old to the new ice coring sites (44.5 m apart, floor construction, construction and preparation of a 10 m depth pit for the rotating mast, construction of stairs between the old and the new ice coring sites, construction of working tables, assembling the mast and the small goliath crane, setting up a lifter, testing the winch system, setting the winch for the chip collector, cable replacement for deep ice coring, assembling of a deep ice core drill, adjustment of a rotating mast, enlargement of caves for ice core storage, and general electrical work in the new ice coring site. The total working time for the above operations was 593.5 person-days. Since the average working time was 6 h/day, the total working time was 3561 person-hours. Preparations for borehole temperature measurements in a 2503 m borehole and the ice coring operation that was mainly conducted by the JARE-45 team are briefly described.

  1. Final site environmental statement: Blue Hills Station, Unit Nos. 1 and 2. Related to the determination of the suitability of Site G for eventual construction. Docket Nos. 50-510 and 50-511

    International Nuclear Information System (INIS)

    1978-07-01

    The site suitability analysis is based on the assumption that the Blue Hills Station will employ two pressurized water reactors to produce outputs of approximately 2814 MWt each. Two steam turbine generators will use the heat produced to provide approximately 957 MWe (gross) each. The exhaust steam will be cooled by four low-profile round mechanical-draft cooling towers. Assuming construction of a nuclear station at site G, a summary of environmental impacts and adverse effects is presented

  2. UK academics share their thoughts on Hinkley Point C

    International Nuclear Information System (INIS)

    Dalton, David

    2016-01-01

    The proposed Hinkley Point C nuclear power plant project has experienced controversy in the public since its inception. However the proposed Hinkley plant has many benefits. It will be the biggest construction site in Europe, providing 25,000 jobs. It will generate low carbon energy, providing enough power for six million homes, and supplying seven per cent of the UK's electricity needs over its 60 year lifetime. Six experts from Imperial College London, one of Europe's top science-based universities, give their opinions on Hinkley Point C.

  3. Characteristics and distribution of trulli constructions in the area of the site of community importance Murgia of Trulli

    Directory of Open Access Journals (Sweden)

    Giuseppe Ruggiero

    2013-10-01

    Full Text Available The agro-forestry territory in the Region of Apulia, southern Italy, is characterised by a widespread and diversified presence of dry stone constructions, including trulli, rural buildings with a characteristic a conical shape. The trulli are mainly to be found in the central and eastern part of the region, called Murgia of Trulli. Trulli are perfectly integrated with the agro-environment specificity of the area, creating a unique landscape and establishing themselves as a testimony of tradition and rural culture. In fact, in this area, from the 17th until the mid-20th century, the trulli accompanied the development of agricultural activities. According to the number of cones they had, they were used as temporary shelters, places of support for primary production, or comfortable houses for the rural population. In recent decades, for several social and economic reasons, this heritage of rural buildings has been affected by abandonment and degradation phenomena. Interventions aimed at recovery and re-use have not always respected the origin of the buildings, their design characteristics or the landscape in which they had been built. In order to reduce the impact that this situation has had on environmental and territorial quality it is, therefore, necessary to develop initiatives to protect and valorise the trulli while respecting the identity of place, the architectural elements, and the agricultural and environmental characteristics of the territory. For this purpose, we need to analyse and characterise the heritage of the existing trulli and its relationship with the local reality. The present paper analyses the typology and distribution of the trulli located on the site of community importance Murgia of Trulli, a protected area with high environmental value in the central-eastern area of the Region of Apulia. Specifically, we analysed the relationship between the trulli buildings and the agro-environment context to acquire a basic

  4. Environmental Assessment for Leasing Land for the Siting, Construction and Operation of a Commercial AM Radio Antenna at Los Alamos National Laboratory, Los Alamos, NM

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-02-16

    The United States (U.S.) Department of Energy (DOE) proposes to lease approximately 3 acres of land at the Los Alamos National Laboratory (LANL) on the southeast tip of Technical Area (TA) 54 for the siting, construction and operation of an AM radio broadcasting antenna. This Environmental Assessment (EA) has been developed in order to assess the environmental effects of the Proposed Action and No Action alternative. The Proposed Action includes the lease of land for the siting, construction and operation of an AM radio broadcasting antenna in TA-54, just north of Pajarito Road and State Highway 4. The No Action Alternative was also considered. Under the No Action Alternative, DOE would not lease land on LANL property for the siting and operation of an AM radio broadcasting antenna; the DOE would not have a local station for emergency response use; and the land would continue to be covered in native vegetation and serve as a health and safety buffer zone for TA-54 waste management activities. Other potential sites on LANL property were evaluated but dismissed for reasons such as interference with sensitive laboratory experiments. Potential visual, health, and environmental effects are anticipated to be minimal for the Proposed Action. The radio broadcasting antenna would be visible against the skyline from some public areas, but would be consistent with other man-made objects in the vicinity that partially obstruct viewsheds (e.g. meteorological tower, power lines). Therefore, the net result would be a modest change of the existing view. Electromagnetic field (EMF) emissions from the antenna would be orders or magnitude less than permissible limits. The proposed antenna construction would not affect known cultural sites, but is located in close proximity to two archaeological sites. Construction would be monitored to ensure that the associated road and utility corridor would avoid cultural sites.

  5. Lexicogrammar in the International Construction Industry: A Corpus-Based Case Study of Japanese-Hong-Kongese On-Site Interactions in English

    Science.gov (United States)

    Handford, Michael; Matous, Petr

    2011-01-01

    The purpose of this research is to identify and interpret statistically significant lexicogrammatical items that are used in on-site spoken communication in the international construction industry, initially through comparisons with reference corpora of everyday spoken and business language. Several data sources, including audio and video…

  6. The Top 100 Linked-To Pages on UK University Web Sites: High Inlink Counts Are Not Usually Associated with Quality Scholarly Content.

    Science.gov (United States)

    Thelwall, Mike

    2002-01-01

    Reports on an investigation into the most highly linked pages on United Kingdom university Web sites. Concludes that simple link counts are highly unreliable indicators of the average behavior of scholars, and that the most highly linked-to pages are those that facilitate access to a wide range of information rather than providing specific…

  7. Differentiation of MIS 9 and MIS 11 in the continental record: vegetational, faunal, aminostratigraphic and sea-level evidence from coastal sites in Essex, UK

    Science.gov (United States)

    Roe, Helen M.; Coope, G. Russell; Devoy, Robert J. N.; Harrison, Colin J. O.; Penkman, Kirsty E. H.; Preece, Richard C.; Schreve, Danielle C.

    2009-11-01

    Multidisciplinary investigations of the vegetational, faunal and sea-level history inferred from the infills of buried channels on the coast of eastern Essex have a direct bearing on the differentiation of MIS 11 and MIS 9 in continental records. New data are presented from Cudmore Grove, an important site on Mersea Island that can be linked to the terrace sequence of the River Thames. The vegetational history has been reconstructed from a pollen sequence covering much of the interglacial represented. The temperate nature of the climate is apparent from a range of fossil groups, including plant remains, vertebrates (especially the rich herpetofauna), molluscs and beetles, which all have strong thermophilous components. The beetle data have been used to derive a Mutual Climatic Range reconstruction, suggesting that mean July temperatures were about 2 °C warmer than modern values for southeast England, whereas mean January temperatures may have been slightly colder. The sea-level history has been reconstructed from the molluscs, ostracods and especially the diatoms, which indicate that the marine transgression occurred considerably earlier in the interglacial cycle than at the neighbouring Hoxnian site at Clacton. There are a number of palynological similarities between the sequence at Cudmore Grove and Clacton, especially the presence of Abies and the occurrence of Azolla filiculoides megaspores. Moreover, both sites have yielded Palaeolithic archaeology, indeed the latter is the type site of the Clactonian (flake-and-core) industry. However, the sites can be differentiated on the basis of mammalian biostratigraphy, new aminostratigraphic data, as well as the differences in the sea-level history. The combined evidence suggests that the infill of the channel at Cudmore Grove accumulated during MIS 9, whereas the deposits at Clacton formed during MIS 11. The infill of a much later channel, yielding non-marine molluscs and vertebrates including Hippopotamus, appears

  8. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  9. Slope Failure Hazards at Basalt Geomorphosites: A Comparative Analysis of the Giant's Causeway World Heritage Site, UK and Penghu Marine Geopark, Taiwan.

    Science.gov (United States)

    Gruendemann, Ciaran; Chung Lin, Jiun; Smith, Bernard

    2010-05-01

    Columnar basalt landscapes hold a fascination that transcends geographical and cultural boundaries. It is because of this that they feature so prominently on the global register of significant geomorphosites. Arguably the most iconic of these basalt landscapes is the Giant's Causeway in Northern Ireland, a status recognized by its inscription as a World Heritage Site. Recognition at this level invariably brings visitor pressure, and with it concern as to the impact they exert on site integrity. Rarely, however, is the same overt concern expressed for the risks that such sites pose to the visitors - or not at least until disaster strikes. Yet, the very features that make these sites attractive - tall, exposed, largely unconstrained columns - render many of them intrinsically unstable, prone to catastrophic collapse and potentially hazardous to visitors. In this presentation we highlight the nature of these slope instability issues through a comparative analysis of two geographically contrasting basalt geomorphosites. Investigations of slope hazard at the Giant's Causeway have shown that many are linked to the distinctive structural characteristics and weathering patterns of flood basalts. Typically, individual flows comprise a columnar ‘colonnade', topped by a blocky ‘entablature' and separated from the flows above and below it by a structurally weaker, but often less-permeable, palaeosol that formed during periods of volcanic quiescence. The collapse of columns is often facilitated by a combination of weathering along ever-widening joints and wedging outwards by debris that falls into them. This gradual distortion of the colonnade makes columns increasingly susceptible to collapse. Often this is triggered by intense rainfall (perhaps following a dry spell) that rapidly infiltrates joints and is ponded on the underlying palaeosol. The precise nature of the failure (toppling or outwards rotation of the column base) is largely dictated by the nature of the

  10. Consequences of least tern (Sternula antillarum) microhabitat nest-site selection on natural and mechanically constructed sandbars in the Missouri River

    Science.gov (United States)

    Stucker, Jennifer H.; Buhl, Deborah A.; Sherfy, Mark H.

    2013-01-01

    Nest-habitat selection in colonial species has rarely been assessed at multiple spatial scales to evaluate its fitness consequences. Management for the federally endangered U.S. Interior population of Least Terns (Sternula antillarum) has focused on maintenance of breeding habitats, including mechanical construction of sandbars from dredged material. Least Terns are attracted to large areas of unvegetated substrate, yet small-scale habitat features are thought to trigger selection for nesting. We evaluated nest-scale habitat selection to determine (1) whether selection differs between constructed and natural sandbars and (2) the subsequent consequences of habitat selection on nest success. During 2006–2008, we examined 869 Least Tern nest sites on constructed and natural sandbars in the Missouri River for evidence of microhabitat selection at the nest in relation to habitat within the surrounding 3-m area. Least Tern nest sites had coarser and larger substrate materials at the nest, more debris, and less vegetation than the surrounding area. Nests in constructed habitats had a greater percentage of coarse substrates and less vegetation or debris than nests in naturally created habitats. Apparent nest success was 1.8× greater on constructed than on natural sandbars. Nest success was best predicted by models with two spatial scales of predictors, including substrates (nest) and vegetation and debris (nest or surrounding area). Our results indicate that Least Terns select nest microhabitat characteristics that are associated with wind- and water-scoured habitats, and that nest success increases when these habitats are selected.

  11. Long-term mercury dynamics in UK soils

    Energy Technology Data Exchange (ETDEWEB)

    Tipping, E., E-mail: et@ceh.ac.uk [Centre for Ecology and Hydrology, Lancaster Environment Centre, Library Avenue, Bailrigg, Lancaster LA1 4AP (United Kingdom); Wadsworth, R.A. [Centre for Ecology and Hydrology, Lancaster Environment Centre, Library Avenue, Bailrigg, Lancaster LA1 4AP (United Kingdom); Norris, D.A.; Hall, J.R. [Centre for Ecology and Hydrology, Environment Centre Wales, Deiniol Road, Bangor, Gwynedd LL57 2UW (United Kingdom); Ilyin, I. [Meteorological Synthesizing Centre - East, Krasina pereulok, 16/1, 123056 Moscow (Russian Federation)

    2011-12-15

    A model assuming first-order losses by evasion and leaching was used to evaluate Hg dynamics in UK soils since 1850. Temporal deposition patterns of Hg were constructed from literature information. Inverse modelling indicated that 30% of 898 rural sites receive Hg only from the global circulation, while in 51% of cases local deposition exceeds global. Average estimated deposition is 16 {mu}g Hg m{sup -2} a{sup -1} to rural soils, 19 {mu}g Hg m{sup -2} a{sup -1} to rural and non-rural soils combined. UK soils currently hold 2490 tonnes of reactive Hg, of which 2140 tonnes are due to anthropogenic deposition, mostly local in origin. Topsoil currently releases 5.1 tonnes of Hg{sup 0} per annum to the atmosphere, about 50% more than the anthropogenic flux. Sorptive retention of Hg in the lower soil exerts a strong control on surface water Hg concentrations. Following decreases in inputs, soil Hg concentrations are predicted to decline over hundreds of years. - Highlights: > Spatial data for mercury in UK soils can be related to past atmospheric deposition. > The residence time of Hg (c. 400 years) depends on gaseous evasion and leaching. > UK soils currently contribute more Hg{sup 0} to the atmosphere than human activities. > Sorption of Hg by deeper soil is a strong control on surface water concentrations. - Atmospherically-deposited anthropogenic mercury, mostly of local origin, has accumulated in UK soils, and is now a significant source of Hg{sup 0} to the global circulation.

  12. Soil-plant interactions and the uptake of Pb at abandoned mining sites in the Rookhope catchment of the N. Pennines, UK - A Pb isotope study

    Energy Technology Data Exchange (ETDEWEB)

    Chenery, S.R.; Izquierdo, M. [British Geological Survey, Keyworth Nottingham, NG12 5GG (United Kingdom); Marzouk, E. [School of Biosciences, Sutton Bonnington Campus, University of Nottingham, LE12 5RD (United Kingdom); Klinck, B.; Palumbo-Roe, B. [British Geological Survey, Keyworth Nottingham, NG12 5GG (United Kingdom); Tye, A.M., E-mail: atye@bgs.ac.uk [British Geological Survey, Keyworth Nottingham, NG12 5GG (United Kingdom)

    2012-09-01

    This paper examines Pb concentrations and sources in soil, grass and heather from the Rookhope catchment in the North Pennines, UK, an area of historical Pb and Zn mining and smelting. Currently, the area has extensive livestock and sports shooting industries. Risk assessment, using the source-pathway-receptor paradigm, requires the quantification of source terms and an understanding of the many factors determining the concentration of Pb in plants. A paired soil and vegetation (grass and heather) geochemical survey was undertaken. Results showed no direct correlation between soil (total or EDTA extractable Pb) and vegetation Pb concentration. However, regression modelling based on the Free-Ion Activity Model (FIAM) suggested that the underlying mechanism determining grass Pb concentration across the catchment was largely through root uptake. Spatial patterns of {sup 206/207}Pb isotopes suggested greater aerosol deposition of Pb on high moorland and prevailing wind facing slopes. This was evident in the isotopic ratios of the heather plants. Pb isotope analysis showed that new growth heather tips typically had {sup 206/207}Pb values of {approx} 1.14, whilst grass shoots typically had values {approx} 1.16 and bulk soil and peat {approx} 1.18. However, the {sup 206/207}Pb ratio in the top few cm of peat was {approx} 1.16 suggesting that grass was accessing Pb from a historical/recent pool of Pb in soil/peat profiles and consisting of both Pennine ore Pb and long-range Pb deposition. Isotope Dilution assays on the peat showed a lability of between 40 and 60%. A simple source apportionment model applied to samples where the isotope ratios was not within the range of the local Pennine Pb, suggested that grass samples contained up to 31% of non-Pennine Pb. This suggests that the historical/recent reservoir of non-Pennine Pb accessed by roots continues to be a persistent contaminant source despite the principal petrol Pb source being phased out over a decade ago

  13. A case-control study of surgical site infection following operative fixation of fractures of the ankle in a large U.K. trauma unit.

    Science.gov (United States)

    Korim, M T; Payne, R; Bhatia, M

    2014-05-01

    Most of the literature on surgical site infections following the surgical treatment of fractures of the ankle is based on small series of patients, focusing on diabetics or the elderly. None have described post-operative functional scores in those patients who develop an infection. We performed an age- and gender-matched case-control study to identify patient- and surgery-related risk factors for surgical site infection following open reduction and internal fixation of a fracture of the ankle. Logistic regression analysis was used to identify significant risk factors for infection and to calculate odds ratios (OR). Function was assessed using the Olerud and Molander Ankle Score. The incidence of infection was 4% (29/717) and 1.1% (8/717) were deep infections. The median ankle score was significantly lower in the infection group compared with the control group (60 vs 90, Mann-Whitney test p fractures (OR = 4, p = 0.048) were significant risk factors for infection. A low incidence of infection following open reduction and internal fixation of fractures of the ankle was observed. Both superficial and deep infections result in lower functional scores.

  14. UK 2009-2010 repeat station report

    Directory of Open Access Journals (Sweden)

    Thomas J.G. Shanahan

    2013-03-01

    Full Text Available The British Geological Survey is responsible for conducting the UK geomagnetic repeat station programme. Measurements made at the UK repeat station sites are used in conjunction with the three UK magnetic observatories: Hartland, Eskdalemuir and Lerwick, to produce a regional model of the local field each year. The UK network of repeat stations comprises 41 stations which are occupied at approximately 3-4 year intervals. Practices for conducting repeat station measurements continue to evolve as advances are made in survey instrumentation and as the usage of the data continues to change. Here, a summary of the 2009 and 2010 UK repeat station surveys is presented, highlighting the measurement process and techniques, density of network, reduction process and recent results.

  15. Development of a test facility to evaluate the optimal design of BMPs for managing environmental problems at construction sites.

    Science.gov (United States)

    2012-06-01

    The following document is the final report for ALDOT Project 930655 which summarizes the design and : construction of the Auburn University Erosion and Sediment Control Testing Facility (AUESCTF) along : with several intermediatescale, f...

  16. Suppliers of petrol to the UK retail market - end 1994

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Suppliers of petrol to the UK retail market (as at 31.12.94) are tabulated, with brand names and company names, areas of operation, and total numbers of retail petrol outlets displaying brand names, self-service sites, company-owned sites and outlets retailing Derv given. Statistics resulting from a retail marketing survey (1995) are listed and cover UK petrol sites from 1985-1994; motorway brands; a regional breakdown of petrol and derv outlets; UK outlets retailing derv; average UK prices for petrol and derv per litre; percentage of petrol sites per company (1994); number of company petrol sites as a percentage of total; number of outlets at hypermarkets/supermarkets; and vapour recovery sites. (UK)

  17. Dedicated Caravan Sites for French Gens du Voyage: Public Health Policy or Construction of Health and Environmental Inequalities?

    Science.gov (United States)

    Foisneau, Lise

    2017-12-01

    In France, gens du voyage ("people who travel" or "travellers") is a term used by the government to categorize various itinerant populations, the majority of which are diverse Romani groups. People categorized as gens du voyage are legally required to reside in particular locations called "dedicated caravan sites." Parliamentary debates about these dedicated caravan sites have clarified that one of the objectives of such sites is to help fulfill the gens du voyage 's right to health. However, there is a significant gap between the officially stated goals of such sites and the reality of life within them. This paper draws on research finding that the conditions in most dedicated caravan sites do not conform with the rights of gens du voyage to acceptable sanitary conditions and other underlying determinants of health.

  18. A construction of Japanese consensus-formation model for the selection of last disposal site of high-level radioactive wastes

    International Nuclear Information System (INIS)

    Oki, Naotaka; Saigusa, Shin; Yonehara, Hidenori

    2010-01-01

    A group with Shizuoka University as the center one is promoting the investigation of the subject 'A construction of Japanese consensus - formation model for the selection of last disposal site of high-level radioactive wastes' adopted in 'Atomic Energy Fundamental Strategic Initiative' at the 20th fiscal year of Heisei, the Ministry of Education, Culture, Sports, Science and Technology. The result of this investigation is described here. (M.H.)

  19. Assessment of radiation impact on the environment components while preparing for construction site of centralized storage facility for spent nuclear fuel (CSSNF)

    International Nuclear Information System (INIS)

    Pavlovs'kij, L.Yi.; Gorodets'kij, D.V.; Syizov, A.O.; Kholodyuk, A.O.

    2016-01-01

    Predictive assessment of radiation impacts on the air environment, soil cover, staff, which is located in a residential area, staff of an adjacent to the CSSNF enterprises as a result of work to prepare the site for construction of CSSNF at the Chornobyl Exclusion Zone is presented. It is shown that radiation effects on components of the environment will not result in exceeding the reference levels of radiation safety

  20. Face, content, and construct validity of four, inanimate training exercises using the da Vinci ® Si surgical system configured with Single-Site ™ instrumentation.

    Science.gov (United States)

    Jarc, Anthony M; Curet, Myriam

    2015-08-01

    Validated training exercises are essential tools for surgeons as they develop technical skills to use robot-assisted minimally invasive surgical systems. The purpose of this study was to show face, content, and construct validity of four, inanimate training exercises using the da Vinci (®) Si surgical system configured with Single-Site (™) instrumentation. New (N = 21) and experienced (N = 6) surgeons participated in the study. New surgeons (11 Gynecology [GYN] and 10 General Surgery [GEN]) had not completed any da Vinci Single-Site cases but may have completed multiport cases using the da Vinci system. They participated in this study prior to attending a certification course focused on da Vinci Single-Site instrumentation. Experienced surgeons (5 GYN and 1 GEN) had completed at least 25 da Vinci Single-Site cases. The surgeons completed four inanimate training exercises and then rated them with a questionnaire. Raw metrics and overall normalized scores were computed using both video recordings and kinematic data collected from the surgical system. The experienced surgeons significantly outperformed new surgeons for many raw metrics and the overall normalized scores derived from video review (p da Vinci Single-Site surgery and actually testing the technical skills used during da Vinci Single-Site surgery. In summary, the four training exercises showed face, content, and construct validity. Improved overall scores could be developed using additional metrics not included in this study. The results suggest that the training exercises could be used in an overall training curriculum aimed at developing proficiency in technical skills for surgeons new to da Vinci Single-Site instrumentation.

  1. Environmental assessment for the resiting, construction, and operation of the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This environmental assessment (EA) presents estimated environmental impacts from the resiting, construction, and operation of the US Department of Energy`s (DOE`s) Environmental and Molecular Sciences Laboratory (EMSL), which is proposed to be constructed and operated on land near the south boundary of the Hanford Site near Richland, Washington. The EMSL, if constructed, would be a modern research facility in which experimental, theoretical, and computational techniques can be focused on environmental restoration problems, such as the chemical and transport behavior of complex mixtures of contaminants in the environment. The EMSL design includes approximately 18,500 square meters (200,000 square feet) of floor space on a 12-hectare (30-acre) site. The proposed new site is located within the city limits of Richland in north Richland, at the south end of DOE`s 300 Area, on land to be deeded to the US by the Battelle Memorial Institute. Approximately 200 persons are expected to be employed in the EMSL and approximately 60 visiting scientists may be working in the EMSL at any given time. State-of-the-art equipment is expected to be installed and used in the EMSL. Small amounts of hazardous substances (chemicals and radionuclides) are expected to be used in experimental work in the EMSL.

  2. Rethinking the Business Model in Construction by the Use of Off-Site System Deliverance: Case of the Shaft Project

    OpenAIRE

    Thuesen, Christian; Hvam, Lars

    2013-01-01

    This paper presents a set of insights to be used in the development of business models for off-site system deliveries contributing to the development of Off-Site Manufacturing practices (OSM). The theoretical offset for discussing the development of business models is the blue ocean strategy literature combined with theories on mass-customization and platform development identifying the optimization of cost and value through the handling of complexity as the central process. This framework is...

  3. Criteria and results from the analysis of the problem of site selection for the construction of high level RAW repository

    International Nuclear Information System (INIS)

    Evstatiev, D.; Kozhoukharova, D.; Iliev, I.; Karagyuleva, J.

    1993-02-01

    The criteria for preliminary assessment of the Bulgarian territory and the results of the selection of prospective sites for future investigation concerning the choice of the suitable places for RAW repositories are presented. The selection of the prospective terrains has been performed in two stages: 1) Categorization of the country according to the prospective conditions for suitable sites and 2) Distinguishing and preliminary assessment of the suitable sites. The number of these sites was reduced to 20 by the method of successive screening. They are located in Northwest and Southeast Bulgaria and are built of marls, clays, granite, gneiss, serpentine and and volcanic rocks. The selected 20 sites has been subjected to preliminary investigation according to a programme specially worked out for the purpose. The investigation covers the analysis and summing up of the available geographical, geomorphological, geological, seismotectonic, hydrological, climatic, hydrogeological and geotechnical data, as well as a minimum of additional field research and laboratory tests. The results of the investigation of each site are presented and discussed. 1 ref

  4. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA): Revised Addition

    Science.gov (United States)

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  5. Constructing Narrative Ecologies as a Site for Teachers' Professional Learning with New Technologies and Media in Primary Education

    Science.gov (United States)

    Turvey, Keith

    2012-01-01

    This article argues that to understand how new technologies and media can become co-agents in the process of pedagogical change, we first need to understand teachers' complex relationship with new technologies and media in both their personal and their professional lives. A conceptual framework is delineated for constructing a complex narrative…

  6. Risk assessment of groundwater environmental contamination: a case study of a karst site for the construction of a fossil power plant.

    Science.gov (United States)

    Liu, Fuming; Yi, Shuping; Ma, Haiyi; Huang, Junyi; Tang, Yukun; Qin, Jianbo; Zhou, Wan-Huan

    2017-12-20

    This paper presents a demonstration of an integrated risk assessment and site investigation for groundwater contamination through a case study, in which the geologic and hydrogeological feature of the site and the blueprint of the fossil power plant (FPP) were closely analyzed. Predictions for groundwater contamination in case of accidents were performed by groundwater modeling system (GMS) and modular three-dimensional multispecies transport model (MT3DMS). Results indicate that the studied site area presents a semi-isolated hydrogeological unit with multiplicity in stratum lithology, the main aquifers at the site are consisted of the filled karst development layer with a thickness between 6.0 and 40.0 m. The poor permeability of the vadose zone at the FPP significantly restricted the infiltration of contaminants through the vadose zone to the subsurface. The limited influence of rarely isotropic porous karstified carbonate rocks on the groundwater flow system premised the simulate scenarios of plume migration. Analysis of the present groundwater chemistry manifested that that the groundwater at the site and the local area are of the HCO 3 -Ca, HCO 3 , and SO 4 -Ca types. A few of the water samples were contaminated by coliform bacteria and ammonia nitrogen as a result of the local cultivation. Prediction results indicate that the impact of normal construction and operation processes on the groundwater environment is negligible. However, groundwater may be partly contaminated within a certain period in the area of leakage from the diesel tanks, the industrial wastewater pool, and the cooling tower water tank in case of accidents. On a positive note, none of the plumes would reach the local sensitive areas for groundwater using. Finally, an anti-seepage scheme and a monitoring program are proposed to safeguard the groundwater protection. The integrated method of the site investigation and risk assessment used in this case study can facilitate the protection of

  7. Hydrogeological and geotechnical requirements for the construction of radioactive waste disposal sites with respect to the CONSOLID-system

    International Nuclear Information System (INIS)

    Giurgea, V.I.

    1999-01-01

    Within the scope of this dissertation, hydrogeological and geotechnical studies were carried out and critically analyzed for the estimation of the site applicability of a proposed low- and intermediate-level radioactive waste site (LILRW) at Cernavoda/Romania. The analysis, studies and modeling had to bring hints concerning the security of the final storage of the Cernovoda site, in accordance with the compliance of the severe recommendations of the IAEA-Vienna (International Atomic Energy Agency). A series of numerical model calculations were performed in completion of the 'in situ'- and laboratory-analyses. These calculations focused principally on the migration of the radionuclides through the base sealing and the geological strata. The results of the calculated models, including numerical simulation of the radionuclides migration, are leading to the conclusion, that even considering the worst possible suppositions and accidents, the groundwater in the deeper underground of the waste disposal site will not be reached by the radionuclides within the institutional control period of 300 years. These modeling results are to be considered the main focus of the thesis. The numerical 2D-simulation of the radionuclides migration through the unsaturated strata, represents a new contribution to the site assessment. The model includes unsaturated soil hydraulic properties determined by laboratory and 'in situ' measurements, as well as the radioactive decay and the ad- and absorbing properties of the geological formations. (orig.) [de

  8. Transportation infrastructure upgrades in the South: A compilation of state plans for construction near nuclear reactor sites

    International Nuclear Information System (INIS)

    1992-03-01

    There are currently 27 nuclear reactor sites located in the southern region. In many instances, the most practicable modes of transportation of spent nuclear fuel from these sites we through the use of highway and rail systems. These two transportation modes have important differences that affect their applicability; chief among these, perhaps, is the fact that while highway systems are publicly owned and maintained rail lines are owned by private entities. For this reason, track condition and maintenance, usage rates and other aspects of rail transport can vary widely. This report reviews southern state, department plans for infrastructure upgrades in the vicinity of nuclear reactor sites. This report includes a summary of planned modifications to bridges, access highways, and rail spurs (where applicable) over the next five years. The information contained herein was gathered from interviews with officials within state departments of transportation. With few exceptions, the contact person was an official within the departmental planning division

  9. Rethinking the Business Model in Construction by the Use of Off-Site System Deliverance: Case of the Shaft Project

    DEFF Research Database (Denmark)

    Thuesen, Christian; Hvam, Lars

    2013-01-01

    This paper presents a set of insights to be used in the development of business models for off-site system deliveries contributing to the development of Off-Site Manufacturing practices (OSM). The theoretical offset for discussing the development of business models is the blue ocean strategy...... of installation shafts. Findings from the development and production of the installation shaft show that system deliveries represent a promising strategy for moving from red ocean competitive environment with the predominant cost+ business model, to a blue ocean situation in which the competition emerges...... in the constant pursue of value creation and cost reduction. On the basis of that system deliverances represent a promising strategy in the future development and application of off-site manufacturing practices. The application of system deliveries is however demanding as it represents a fundamental shift...

  10. Nuclear reactor constructions

    International Nuclear Information System (INIS)

    Baddley, A.H.

    1981-01-01

    A method of constructing a radiation shielding plug for use in the roof of the coolant containment vault of liquid metal cooled fast breeder reactors is described. The construction allows relative movement of that part of service cables and pipes which are carried by the fixed roof and that part which is carried by the rotatable plug. (U.K.)

  11. Integration of open metal sites and Lewis basic sites for construction of a Cu MOF with rare chiral Oh type of cage for high performance of methane purification

    KAUST Repository

    Shi, Zhan; Meng, Lingkun; Niu, Ziyuan; Liang, Chen; Dong, Xinglong; Liu, Kang; Li, Guanghua; Li, Chunguang; Han, Yu; Feng, Shouhua

    2018-01-01

    A Cu MOF [Cu4(PMTD)2(H2O)3]·20H2O, 1, (Where PMTD is (1,4-phenylenebis(5-methyl-4H-1,2,4-triazole-3,4-diyl)bis(5-carboxylato-3,1-phenylene)bis(hydroperoxymethanide) with rare chiral Oh type of cage and dual functionalities of open metal sites and Lewis basic sites based on a designed U-shaped ligand was synthesized by hydrothermal method. It exhibits high-capacity of CO2, C2 and C3 hydrocarbon storage capacity under atmospheric pressure as well as high H2 (1.96% wt) adsorption capacity at 77K. Methane purification capacity was tested and verified step by step. Isosteric heats (Qst) study reveals that CH4 has the weakest van der Waals host- guest interactions among the seven gases at 298K. Ideal adsorbed solution theory (IAST) calculation reveals that compound 1 is more selective toward CO2, C2H6 and C3H8 over CH4 in further calculating its separation capacity, as exemplified for CO2/CH4 (50:50, 5:95), C2H6/CH4 (50:50, 5:95) or C3H8/CH4 (50:50, 5:95) binary gas mixtures. Breakthrough experiments show that 1 has a significantly higher adsorption capacity for CO2, C2H6 and C3H8 than CH4. The selective adsorption properties of 1 make it a promising candidate for methane purification.

  12. Integration of open metal sites and Lewis basic sites for construction of a Cu MOF with rare chiral Oh type of cage for high performance of methane purification

    KAUST Repository

    Shi, Zhan

    2018-01-18

    A Cu MOF [Cu4(PMTD)2(H2O)3]·20H2O, 1, (Where PMTD is (1,4-phenylenebis(5-methyl-4H-1,2,4-triazole-3,4-diyl)bis(5-carboxylato-3,1-phenylene)bis(hydroperoxymethanide) with rare chiral Oh type of cage and dual functionalities of open metal sites and Lewis basic sites based on a designed U-shaped ligand was synthesized by hydrothermal method. It exhibits high-capacity of CO2, C2 and C3 hydrocarbon storage capacity under atmospheric pressure as well as high H2 (1.96% wt) adsorption capacity at 77K. Methane purification capacity was tested and verified step by step. Isosteric heats (Qst) study reveals that CH4 has the weakest van der Waals host- guest interactions among the seven gases at 298K. Ideal adsorbed solution theory (IAST) calculation reveals that compound 1 is more selective toward CO2, C2H6 and C3H8 over CH4 in further calculating its separation capacity, as exemplified for CO2/CH4 (50:50, 5:95), C2H6/CH4 (50:50, 5:95) or C3H8/CH4 (50:50, 5:95) binary gas mixtures. Breakthrough experiments show that 1 has a significantly higher adsorption capacity for CO2, C2H6 and C3H8 than CH4. The selective adsorption properties of 1 make it a promising candidate for methane purification.

  13. Projections of cost and on-site manual-labor requirements for constructing electric-generating plants, 1980-1990

    International Nuclear Information System (INIS)

    1982-02-01

    This report represents part of a continuing effort by the Federal Government to forecast the capital and labor required for constructing electric generating capacity additions necessary to accommodate projected economic and population growth in the US and its regions. Information is included on anticipated additions to electric generating capacity, labor requirements for these additions, capital cost requirements, and forecasting models. Coal-fired, nuclear, hydro, and pumped storage power plants are considered in these forecasts

  14. Ecological Wisdom and Inspiration Underlying the Planning and Construction of Ancient Human Settlements: Case Study of Hongcun UNESCO World Heritage Site in China

    Directory of Open Access Journals (Sweden)

    Shanwen Zheng

    2018-04-01

    Full Text Available Human settlements are social-economic-natural complex ecosystems centered on human activities and the most prominent site for the contradictions between humans and the environment. Taking Hongcun, a UNESCO World Heritage site in China, as an example, this paper analyzes the methods and effect of coupling man and nature in Hongcun, summarizes the ecological wisdom of dealing with the relationship between human and nature, and uses this wisdom to shed light on the planning, construction, and management of contemporary urban and rural settlements. Firstly, the study introduces the Human-Natural Intergraded Ecological Planning (HNIEP model’s hypothesis, explaining its foundation and potential principles or approaches. Secondly, using the case study of Hongcun to explain, support, and validate the HNIEP model and its framework, the study found that the unique planning and construction of Hongcun has greatly promoted ecosystem services, such as local microclimate regulation, rainwater runoff regulation, water conservation, landscape aesthetic, and engagement with nature. Thirdly, Hongcun reflects the concept of harmonious coexistence between human and nature, the wisdom of rational use of ecosystem structures, processes and functions, and the wisdom of coupling human activities with the living environment and natural ecosystem. Finally, the paper summarizes the enlightenment brought by both the HNIEP model and Hongcun wisdom to contemporary urban-rural planning and construction management.

  15. Biological assessment of the effects of construction and operation of a depleted uranium hexafluoride conversion facility at the Portsmouth, Ohio,site

    International Nuclear Information System (INIS)

    Van Lonkhuyzen, R.

    2005-01-01

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF 6 ) Management Program evaluated alternatives for managing its inventory of DUF 6 and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF 6 PEIS) in April 1999 (DOE 1999). The DUF 6 inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF 6 PEIS, DOE stated its decision to promptly convert the DUF 6 inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF 6 conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF 6 cylinders stored at ETTP to the Portsmouth site for conversion. This biological assessment (BA) has been prepared by DOE, pursuant to the National Environmental Policy Act of 1969 and the Endangered Species Act of 1974, to evaluate potential impacts to federally listed species from the construction and operation of a conversion facility at the DOE Portsmouth site. The Indiana bat is known to occur in the area of the Portsmouth site and may potentially occur on the site during spring or summer. Evaluations of the Portsmouth site indicated that most of the site was found to have poor summer habitat for the Indiana bat because of the small size, isolation, and insufficient maturity of the few woodlands on the site. Potential summer habitat for the Indiana bat was identified outside the developed area bounded by Perimeter Road, within the corridors

  16. Site investigations, design, construction, operation, shutdown and surveillance of repositories for low- and intermediate-level radioactive wastes in rock cavities

    International Nuclear Information System (INIS)

    1984-01-01

    The report provides an overview and technical guidelines for considerations and for activities to be undertaken for safety assessment, site investigations, design, construction, operation, shutdown and surveillance of repositories for the disposal of low- and intermediate-level radioactive wastes in rock cavities. A generalized sequence of investigations is introduced which proceeds through region and site selection to the stage where the site is confirmed by detailed geoscientific investigations as being suitable for a waste repository. The different procedures and somewhat specific investigative needs with respect to existing mines are dealt with separately. General design, as well as specific requirements with respect to the different stages of design and construction, are dealt with. A review of activities related to the operational and post-operational stages of repositories in rock cavities is presented. The report describes in general terms the procedures related to different stages of disposal operation; also the conditions for shutdown together with essential shutdown and sealing activities and the related safety assessment requirements. Guidance is also given on the surveillance programme which will allow for inspection, testing, maintenance and security of a disposal facility during the operational phase, as well as for the post-operational stage for periods determined as necessary by the national authorities

  17. Cost viability of 3D printed house in UK

    Science.gov (United States)

    Tobi, A. L. Mohd; Omar, S. A.; Yehia, Z.; Al-Ojaili, S.; Hashim, A.; Orhan, O.

    2018-03-01

    UK has been facing housing crisis due to the rising price of the property on sale. This paper will look into the viability of 3D printing technology as an alternative way for house construction on UK. The analysis will be carried out based on the data until the year of 2014 due to limited resources availability. Details cost breakdown on average size house construction cost in UK were analysed and relate to the cost viability of 3D printing technology in reducing the house price in UK. It is found that the 3D printing generates saving of up to around 35% out of total house price in UK. This cost saving comes from the 3D printed construction of walls and foundations for material and labour cost.

  18. Environmental Assessment for Tower Construction at the Brandywine Communication Receiver Site, Prince George’s County, Maryland

    Science.gov (United States)

    2005-05-01

    Poecile atricapilla), northern cardinal (Cardinalis cardinalis), and eastern mockingbird (Mimus polyglottos). The Brandywine Site is in the...birds in poor weather conditions (e.g., low cloud ceiling, fog, rain, or poor visibility), and have caused massive bird kills when nocturnal...resources that the Service is authorized to protect. Take (i.e., killing ) of migratory birds by any person without authorization may constitute a

  19. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 2, Sections 1-6

    Energy Technology Data Exchange (ETDEWEB)

    1991-04-01

    This (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains the analysis of programmatic alternatives, project alternatives, affected environment of alternative sites, environmental consequences, and environmental regulations and permit requirements.

  20. Quality of life and probable psychological distress among male workers at a construction site, Kolar district, Karnataka, India.

    Science.gov (United States)

    Mathew, Geethu; Ramesh, Naveen; Shanbhag, Deepthi; Goud, Ramakrishna; Subramanian, Sharan; Lobo, Carol; Xavier, Alex; Dasari, Prudhvi

    2016-01-01

    The construction industry, which mainly consists of migrant labouers is one of the largest employers in the unorganized sector in India. These workers work in poor conditions and are often vulnerable to exploitation. These workers also do not have health care benefits and often these factors lead to poor quality of life (QOL) and psychological distress. To assess the QOL, probable psychological distress and associated factors among male construction workers. A cross-sectional study was conducted between September 2013 and November 2013 among 404 male workers. These construction workers were enrolled by consecutive sampling at a construction area in Kolar district, Kaarnataka, India. The study tools used were World Health Organization (WHO) QOL-BREF and 12-Item General Health Questionnaire (GHQ-12) to assess QOL and probable psychological distress, respectively. The transformed scores in WHO QOL-BREF in all four domains ranged 0-100. The four domain scores are scaled in a positive direction with higher scores indicating a higher QOL. Associations were done using statistical tests such as Chi-square, correlation, regression, independent samples t-test, and analysis of variance (ANOVA). A total of 404 male workers with a mean age of 25.6 ± 7.3 years were studied. Mean scores of various domains of QOL were 68.5 ± 13.7 (physical), 59.9 ± 13.5 (psychological), 64.3 ± 16.4 (social), and 44.1 ± 12.8 (environmental). On the self- rating scale, 59 (14.6%) workers were rated as having poor QOL. The prevalence of probable psychological distress was 27.5%. Factors such as increasing age, being currently married, and low educational status were found to be significantly associated (P psychological distress. There was a significant negative correlation (P psychological distress and a positive correlation between income and QOL. The QOL in the environmental domain, which mainly deals with living conditions, health, and recreational facilities was found to be poor and there

  1. The design and construction of large diameter pre-filter packed recovery wells at the Ninth Avenue Superfund Site

    International Nuclear Information System (INIS)

    Lombardo, S.L.; Maley, T.J.; Bono, B.A.

    1992-01-01

    Large diameter groundwater/oil recovery wells were installed in an unconfined sand aquifer at the Ninth Avenue Superfund Site in Gary, Indiana. To assure adequate filter packs, prefilter packed groundwater/oil recovery wells were selected to minimize silting by using appropriate screen slot size and filter pack. A properly sized filter pack was necessary to prevent the formation material from entering the well. During field drilling operations, open-quotes having sandsclose quotes and silting of existing wells were encountered. By using sieve analyses of the native aquifer soil, described by Driscoll (1989), the filter pack and screen slot size were selected. Prefilter packed well screens were selected for this site to assure the presence of a uniform filter pack, thus minimizing siltation in the wells. A prefilter packed well screen consists of a double screen with the interstitial space filled with granular filter pack material designed specifically for site conditions. These wells provide the adequate filter pack without the need to add additional filter pack material outside the well screen. Wells were installed using 12 1/4 inch ID hollow stem augers. This methodology is EPA-approved, expeditious, and inexpensive. Level B personal protective equipment was required during installation. Therefore, the advantages of hollow stem drilling include short drilling time and no circulation fluids. The 14 recovery wells were successfully installed in 14 days using the hollow stem auger drilling technique. Observations during well development revealed little or no silt present in purged groundwater

  2. AN INNOVATIVE APPROACH FOR CONSTRUCTING AN IN-SITU BARRIER FOR STRONTIUM-90 AT THE HANFORD SITE WASHINGTON

    Energy Technology Data Exchange (ETDEWEB)

    FABRE RJ

    2008-12-08

    Efforts to reduce the flux of Sr-90 to the Columbia River from Hanford Site 100-N Area past-practice liquid waste disposal sites have been underway since the early 1990s. Termination of all liquid discharges to the ground in 1993 was a major step toward meeting this goal. However, Sr-90 adsorbed on aquifer solids beneath liquid waste disposal sites and extending beneath the near-shore riverbed remains a continuing contaminant source to groundwater and the Columbia River. The initial pump-and-treat system proved to be ineffective as a long-term solution because of the geochemical characteristics of Sr-90. Following an evaluation of potential Sr-90 treatment technologies and their applicability under 100-NR-2 Operable Unit hydrogeologic conditions, the U.S. Department of Energy and the Washington State Department of Ecology agreed to evaluate apatite sequestration as the primary remedial technology, combined with a secondary polishing step utilizing phytoextraction if necessary. Aqueous injection was initiated in July 2005 to assess the efficacy of in-situ apatite along the 100 m of shoreline where Sr-90 concentrations are highest. The remedial technology is being developed by Pacific Northwest National Laboratory. CH2M Hill Plateau Remediation Company is implementing this technology in the field with support from PNNL.

  3. An Innovative Approach for Constructing an In-Situ Barrier for Strontium-90 at the Hanford Site, Washington - 9325

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, K. M.; Fabre, Russel J.; Vermeul, Vincent R.; Szecsody, James E.; Fellows, Robert J.; Williams, Mark D.; Fruchter, Jonathan S.

    2008-12-10

    Efforts to reduce the flux of Sr-90 to the Columbia River from Hanford Site 100-N Area past-practice liquid waste disposal sites have been underway since the early 1990s. Termination of all liquid discharges to the ground in 1993 was a major step toward meeting this goal. However, Sr 90 adsorbed on aquifer solids beneath liquid waste disposal sites and extending beneath the near-shore riverbed remains a continuing contaminant source to groundwater and the Columbia River. The initial pump-and treat system proved to be ineffective as a long-term solution because of the geochemical characteristics of Sr-90. Following an evaluation of potential Sr-90 treatment technologies and their applicability under 100 NR-2 Operable Unit hydrogeologic conditions, the U.S. Department of Energy and the Washington State Department of Ecology agreed to evaluate apatite sequestration as the primary remedial technology, combined with a secondary polishing step utilizing phytoextraction if necessary. Aqueous injection was initiated in July 2005 to assess the efficacy of in-situ apatite along the 100 m of shoreline where Sr-90 concentrations are highest. The remedial technology is being developed by Pacific Northwest National Laboratory. CH2M Hill Plateau Remediation Company is implementing this technology in the field with support from PNNL.

  4. Characterisation of Beaver Habitat Parameters That Promote the Use of Culverts as Dam Construction Sites: Can We Limit the Damage to Forest Roads?

    Directory of Open Access Journals (Sweden)

    Geneviève Tremblay

    2017-12-01

    Full Text Available The use of forest roads as foundations for dam construction by beavers is a recurrent problem in the management of forest road networks. In order to limit the damage to forest roads, our goal was to calculate the probability of beaver dam installation on culverts, according to surrounding habitat parameters, which could allow for improvement in the spatial design of new roads that minimise conflicts with beavers. Comparisons of culverts with (n = 77 and without (n = 51 dams in northwestern Quebec showed that catchment surface, cumulate length of all local streams within a 2-km radius, and road embankment height had a negative effect on the probability of dam construction on culverts, while flow level and culvert diameter ratio had a positive effect. Nevertheless, predicted probabilities of dam construction on culverts generally exceeded 50%, even on sites that were less favourable to beavers. We suggest that it would be more reasonable to take their probable subsequent presence into account at the earliest steps of road conception. Installing mitigation measures such as pre-dams during road construction would probably reduce the occurrence of conflicts with beavers and thus reduce the maintenance costs of forest roads.

  5. Resilience improvements to UK nuclear power plants

    International Nuclear Information System (INIS)

    Pepper, Kevin

    2015-01-01

    Following the events at Fukushima, the Office for Nuclear Regulation (ONR), the UK nuclear safety regulator, undertook a series of reviews into the resilience of UK nuclear power plants to severe events. These reviews highlighted a number of areas in relation to electrical infrastructure where it considered licensees should review their arrangements, considering both onsite and offsite infrastructure as well as the ability to recover following a complete loss of site infrastructure. In response, UK licensees have been exploring four parallel approaches to improving the resilience for each of their sites. Firstly, through modifications on-site such as enhancements to the installed diesel generators and related systems. Secondly through improvements to the resilience of essential instrumentation to Station Black Out events. Thirdly, through the provision of off-site backup equipment that can be deployed to any site following a severe event. Finally, the provision of event qualified connection points on site to enable timely restoration of long term essential electrical supplies and cooling to key systems. This last item gives a central focus to the issues of switchboard availability and the resilience of the whole network to large potentially common cause internal and external hazards. This paper will discuss the electrically related findings of the ONR reviews, explore the reasoning behind those decisions, and describe the approaches being taken by UK licensees. (authors)

  6. A UK perspective on recycling

    International Nuclear Information System (INIS)

    Williams, T.

    1991-01-01

    The United Kingdom, through the recycling of depleted uranium from Magnox reactors into Advanced Gas-cooled Reactor (AGR) fuel, has already recycled significant quantities of reprocessed material in reactors owned by Nuclear Electric plc and Scottish Nuclear Limited. This AGR fuel has been satisfactorily irradiated and discharged over a decade or more, and will be reprocessed in the new Thermal Oxide Reprocessing Plant (THORP), currently under construction in the UK. British Nuclear Fuels plc (BNFL) and the UK Atomic Energy Authority (UKAEA) have also been exploiting the potential of plutonium recycled in mixed oxide (MOX) fuel, which they have been making since 1963. All of the UK nuclear companies are committed to further recycling of Magnox depleted uranium during the 1990s, and it is anticipated that oxide recycling will also become firmly established during the next decade. British Nuclear Fuels and Urenco Ltd, as the providers of fuel cycle services, are developing an infrastructure to close the fuel cycle for oxide nuclear fuel, using both the uranium and plutonium arising from reprocessing. (author)

  7. Supervision of radiation protection of miners at small construction sites of old mining; Aufsichtliche Ueberwachung zum Strahlenschutz von Bergleuten bei untertaegigen Bergsicherungsarbeiten im Altbergbau

    Energy Technology Data Exchange (ETDEWEB)

    Dehnert, J. [Saechsisches Landesamt fuer Umwelt, Landwirtschaft und Geologie (Germany). Referat Strahlenschutz

    2016-07-01

    More than 40 underground construction sites of old mining have been supervised by the radiation protection authority in Saxony in recent years. The paper deals with stories of underground supervisions to share the experiences with authorities and miners to improve the underground radiation protection. Supervision usually includes continuous measurements of radon activity concentrations. Some insufficient or failed radiation protection measures were found during the inspections. Instructions were given to improve the underground radiation protection immediately. A new Express- Air Screen-System (EAS) for miners was developed to shut off radon rich parts of galleries in some minutes only. The EAS will help to reduce the radon exposures of miners in the future.

  8. Environmental considerations associated with siting, constructing, and operating a special isotope separation plant at INEL: Volume 1, Proceedings: Report of public hearings

    International Nuclear Information System (INIS)

    1987-03-01

    This report documents the two public hearings conducted for the purpose of determining the scope of issues to be addressed in relation to the siting, constructing, and operating of a special isotope separation plant at INEL. The report includes transcripts of the public hearings held in Idaho Falls, Idaho, February 24, 1987, and in Boise, Idaho, February 26, 1987, and includes the exhibits of records relating to those hearings. The review and hearing process meets pertinent National Environmental Policy Act (NEPA) requirements, Council on Environmental Quality (CEQ) regulations, and DOE guidelines

  9. Environmental considerations associated with siting, constructing, and operating a special isotope separation plant at INEL: Volume 2, Proceedings: Report of public hearings

    International Nuclear Information System (INIS)

    1987-03-01

    This report documents the two public hearings conducted for the purpose of determining the scope of issues to be addressed in relation to the siting, constructing, and operating of a special isotope separation plant at INEL. The report includes transcripts of the public hearings held in Idaho Falls, Idaho, February 24, 1987, and in Boise, Idaho, February 26, 1987, and includes the exhibits of record relating to those hearings. The review and hearing process meets pertinent National Environmental Policy Act (NEPA) requirements, Council on Environmental Quality (CEQ) regulations, and DOE guidelines

  10. Nuclear power and public acceptance in the UK

    International Nuclear Information System (INIS)

    Baker, J.W.

    1985-01-01

    The subject is covered in sections: introduction; UK nuclear experience (experience of the Central Electricity Generating Board; impartial assessment); Sizewell inquiry (into proposal to construct a PWR based plant as Sizewell B; inquiry process; ground covered; economics and safety; project management); public acceptance (sociological studies); long-term programme. (U.K.)

  11. Design and construction of deinococcus radiodurans for biodegradation of organic toxins at radioactive DOE waste sites. 1998 annual progress report

    International Nuclear Information System (INIS)

    Daly, M.J.; Minton, K.W.; Wackett, L.P.

    1998-01-01

    'A 1992 survey of DOE waste sites indicates that about 32% of soils and 45% of groundwaters at these sites contain radionuclides and metals plus an organic toxin class. The most commonly reported combinations of these hazardous compounds being radionuclides and metals (e.g., U, Pu, Cs, Pb, Cr, As) plus chlorinated hydrocarbons (e.g., trichloroethylene), fuel hydrocarbons (e.g., toluene), or polychlorinated biphenyls (e.g., Arochlor 1248). These wastes are some of the most hazardous pollutants and pose an increasing risk to human health as they leach into the environment. The objective of this research is to develop novel organisms, that are highly resistant to radiation and the toxic effects of metals and radionuclides, for in-situ bioremediation of organic toxins. Few organisms exist that are able to remediate such environmental organic pollutants, and among those that can, the bacteria belonging to the genus Pseudomonas are the most characterized. Unfortunately, these bacteria are very radiation sensitive. For example, Pseudomonas spp. is even more sensitive than Escherichia coli and, thus, is not suitable as a bioremediation host in environments subjected to radiation. By contrast, D. radiodurans, a natural soil bacterium, is the most radiation resistant organism yet discovered; it is several thousand times more resistant to ionizing radiation than Pseudomonas. The sophisticated gene transfer and expression systems the authors have developed for D. radiodurans over the last eight years make this organism an ideal candidate for high-level expression of genes that degrade organic toxins, in radioactive environments. The authors ultimate aim is to develop organisms and approaches that will be useful for remediating the large variety of toxic organic compounds found in DOE waste sites that are too radioactive to support other bioremediation organisms. This report summarizes work after the first 6 months of a 3-year project.'

  12. Safety issues in construction of facilities for long-term storage of radioactive waste at vector site

    Energy Technology Data Exchange (ETDEWEB)

    Tokarevskyi, O.; Alekseeva, Z.; Kondratiev, S. [State Scientific and Technical Center for Nuclear and Radiation Safety, Kyiv (Ukraine); Rybalka, N. [State Nuclear Regulatory Inspectorate of Ukraine, Kyiv (Ukraine)

    2013-07-01

    In Ukraine, it is planned to create a number of near-surface facilities for disposal of short-lived RW and long-term (up to 100 years) storage of long-lived RW at the Vector site in the Chernobyl exclusion zone. The expected streams of long-lived RW are analyzed in the paper. According to the analysis of RW streams, in particular, issues are considered on development of RW acceptance criteria, admissible radiological impacts during preparation of RW for long-term storage, reliability of barriers (RW packages, modules and structures, etc.) during long-term storage of RW. (orig.)

  13. The UK biomass industry

    International Nuclear Information System (INIS)

    Billins, P.

    1998-01-01

    A brief review is given of the development of the biomass industry in the UK. Topics covered include poultry litter generation of electricity, gasification plants fuelled by short-rotation coppice, on-farm anaerobic digestion and specialized combustion systems, e.g. straw, wood and other agricultural wastes. (UK)

  14. [System construction of early warning for ecological security at cultural and natural heritage mixed sites and its application: a case study of Wuyishan Scenery District].

    Science.gov (United States)

    You, Wei-Bin; He, Dong-Jin; Qin, De-Hua; Ji, Zhi-Rong; Wu, Li-Yun; Yu, Jian-An; Chen, Bing-Rong; Tan, Yong

    2014-05-01

    This paper proposed a new concept of ecological security for protection by a comprehensive analysis of the contents and standards of world heritage sites. A frame concept model named "Pressure-State-Control" for early warning of ecological security at world heritage mixed sites was constructed and evaluation indicators of this frame were also selected. Wuyishan Scenery District was chosen for a case study, which has been severely disturbed by natural and artificial factors. Based on the frame model of "Pressure-State-Control" and by employing extension analysis, the matter-element model was established to assess the ecological security status of this cultural and natural world heritage mixed site. The results showed that the accuracy of ecological security early warning reached 84%. Early warning rank was I level (no alert status) in 1997 and 2009, but that in 2009 had a higher possibility to convert into II level. Likewise, the early-warning indices of sensitive ranks were different between 1997 and 2009. Population density, population growth rate, area index for tea garden, cultivated land owned per capita, level of drought, and investment for ecological and environmental construction were the main limiting factors to hinder the development of ecological security from 2009 to future. In general, the status of Wuyishan Scenery District ecological security was relatively good and considered as no alert level, while risk conditions also existed in terms of a few early-warning indicators. We still need to pay more attention to serious alert indicators and adopt effective prevention and control measures to maintain a good ecological security status of this heritage site.

  15. Biological assessment of the effects of construction and operation of a depleted uranium hexafluoride conversion facility at the Paducah, Kentucky, site.

    Energy Technology Data Exchange (ETDEWEB)

    Van Lonkhuyzen, R.

    2005-09-09

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF6 inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This biological assessment (BA) has been prepared by DOE, pursuant to the National Environmental Policy Act of 1969 (NEPA) and the Endangered Species Act of 1974, to evaluate potential impacts to federally listed species from the construction and operation of a conversion facility at the DOE Paducah site.

  16. A UK view of Bulgaria's potential

    International Nuclear Information System (INIS)

    Haddon, J.

    2002-01-01

    This is a personal view of the options and challenges for the future of Eastern Europe countries. The widening of Europe, UK situation and investment criteria are discussed. Bulgaria is considered in better shape than some European states as a host for new or replacement nuclear power station construction

  17. Wetland assessment of the effects of construction and operation of a depleted uranium hexafluoride conversion facility at the Portsmouth, Ohio, site

    International Nuclear Information System (INIS)

    Van Lonkhuyzen, R.

    2005-01-01

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF 6 ) Management Program evaluated alternatives for managing its inventory of DUF 6 and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF 6 PEIS) in April 1999 (DOE 1999). The DUF 6 inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF 6 PEIS, DOE stated its decision to promptly convert the DUF 6 inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF 6 conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF 6 cylinders stored at ETTP to the Portsmouth site for conversion. This wetland assessment has been prepared by DOE, pursuant to Executive Order 11990 (''Protection of Wetlands'') and DOE regulations for implementing this Executive Order as set forth in Title 10, Part 1022, of the ''Code of Federal Regulations'' (10 CFR Part 1022 [Compliance with Floodplain and Wetland Environmental Review Requirements]), to evaluate potential impacts to wetlands from the construction and operation of a conversion facility at the DOE Portsmouth site. Approximately 0.02 acre (0.009 ha) of a 0.08-acre (0.03-ha) palustrine emergent wetland would likely be eliminated by direct placement of fill material during facility construction at Location A. Portions of this wetland that are not filled may be indirectly affected by an altered hydrologic regime because of the

  18. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 3, Sections 7-12, Appendices A-C

    Energy Technology Data Exchange (ETDEWEB)

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains references; a list of preparers and recipients; acronyms, abbreviations, and units of measure; a glossary; an index and three appendices.

  19. Construction of a high affinity zinc binding site in the metabotropic glutamate receptor mGluR1

    DEFF Research Database (Denmark)

    Jensen, Anders A.; Sheppard, P O; Jensen, L B

    2001-01-01

    a molecular model of the ATD of mGluR1 based on a weak amino acid sequence similarity with a bacterial periplasmic binding protein. The ATD consists of two globular lobes, which are speculated to contract from an "open" to a "closed" conformation following agonist binding. In the present study, we have...... created a Zn(2+) binding site in mGluR1b by mutating the residue Lys(260) to a histidine. Zinc acts as a noncompetitive antagonist of agonist-induced IP accumulation on the K260H mutant with an IC(50) value of 2 microm. Alanine mutations of three potential "zinc coligands" in proximity to the introduced...

  20. Comment of "Event-based soil loss models for construction sites" by Trenouth and Gharabaghi, J. Hydrol. doi: 10.1016/jhydrol.2015.03.010

    Science.gov (United States)

    Kinnell, P. I. A.

    2015-09-01

    Trenouth and Gharabaghi (2015) present two models which replace the EI30 index used as the event erosivity index in the USLE/RUSLE with ones that include runoff and values of EI30 to powers that differ for 1.0 as the event erosivity factor in modelling soil loss for construction sites. Their analysis on the application of these models focused on data from 5 locations as a whole but did not show how the models worked at each location. Practically, the ability to predict sediment yields at a specific location is more relevant than the capacity of a model to predict sediment yields globally. Also, the mathematical structure of their proposed models shows little regard to the physical processes involved in causing erosion and sediment yield. There is still the need to develop event-based empirical models for construction sites that are robust because they give proper consideration to the erosion process involved, and take account of the fact that sediment yield is usually determined from measurements of suspended load whereas soil loss at the scale for which the USLE/RUSLE model was developed includes both suspended load and bed load.

  1. Electricity supply in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Eden, R; Evans, N

    1986-01-01

    This study is about future needs for electricity in the United Kingdom, the options for meeting these needs, and the issues that affect the choices between options. It examines the implications of the nuclear accident at Chernobyl and the problems that could arise if decisions on new power station construction continue to be delayed following the Sizewell PWR Inquiry. The book reviews the historical development of electricity supply in the UK. Alternative scenarios are outlined for future energy and electricity demand and their implications for future power station construction are deduced. Issues that are discussed include the choice of coal or nuclear power and the related political uncertainties, environmental problems such as acid rain, feasibility and costs of electricity supply options, and the likely effect on future energy import costs of alternative choices for electricity supply.

  2. Construction safety

    CERN Document Server

    Li, Rita Yi Man

    2013-01-01

    A close-to-ideal blend of suburb and city, speedy construction of towers of Babylon, the sparkling proportion of glass and steel buildings’ facade at night showcase the wisdom of humans. They also witness the footsteps, sweats and tears of architects and engineers. Unfortunately, these signatures of human civilizations are swathed in towering figures of construction accidents. Fretting about these on sites, different countries adopt different measures on sites. This book firstly sketches the construction accidents on sites, followed by a review on safety measures in some of the developing countries such as Bermuda, Egypt, Kuwait and China; as well as developed countries, for example, the United States, France and Singapore. It also highlights the enormous compensation costs with the courts’ experiences in the United Kingdom and Hong Kong.

  3. A CD with the wishes for the 21st century from thousands of readers of the science magazine "Newton", was buried at the Atlas construction site on 16.03.2000 (handling the CD: Giorgio Riviecco, Editor of "Newton")

    CERN Multimedia

    Laurent Guiraud

    2000-01-01

    A CD with the wishes for the 21st century from thousands of readers of the science magazine "Newton", was buried at the Atlas construction site on 16.03.2000 (handling the CD: Giorgio Riviecco, Editor of "Newton")

  4. UK ignores treaty obligations

    International Nuclear Information System (INIS)

    Roche, P.

    1995-01-01

    A detailed critique is offered of United Kingdom (UK) political policy with respect to the Non-Proliferation Treaty, an interim agreement valid while nuclear disarmament was supposed to occur, by a representative of Greenpeace, the anti-nuclear campaigning group. The author argues that the civil and military nuclear programmes are still firmly linked, and emphasises his opinions by quoting examples of how UK politicians have broken treaty obligations in order to pursue their own political, and in some cases financial, goals. It is argued that the treaty has failed to force nuclear countries to disarm because of its promoted civil nuclear power programmes. (U.K.)

  5. An assessment of site suitability for marina construction in Istanbul, Turkey, using GIS and AHP multicriteria decision analysis.

    Science.gov (United States)

    Gumusay, Mustafa Umit; Koseoglu, Gokalp; Bakirman, Tolga

    2016-12-01

    Marinas play a key role in sea transportation and tourism. The problem of an insufficient marina capacity has revealed in terms of sea traffic due to the demographic structure and increasing tourism potential of Istanbul which is the biggest metropolitan city of Turkey and has around 600-km-long coastline. Therefore, the study area is mainly focused on the Marmara Sea shoreline of Istanbul. Rather than traditional methods, a rapid and cost-effective solution which considers natural and urban environment conditions is essential to satisfy the need for a marina site selection. Thanks to the latest improvements in geographic information systems, it is convenient to perform location selection analysis of marinas taking advantages of geology, land use, demography and accessibility data sets. The goal of this study is to define the areas that are appropriate for building marinas, with the use of topographic and demographic data in a present shoreline applying analytical hierarchy process multicriteria decision-making method. In this study, erosion, landslide, tsunami, land use, geologically hazardous areas, transfer lines, sea traffic data, neighbourhood scale population, age patterns and house income data have been used. Analytical hierarchy process method is used to give a weight to each data set, and a grading system has been developed for the area selection of marinas. The result maps of the analysis that show study area as classified into four categories from good to not suitable are presented. It is possible to create a decision support system for upper scale plans that enable authorities to perform analysis accurately, cost and time effectively using the proposed methodology that integrates multiple data sets with different scales and types.

  6. Construction completion report

    International Nuclear Information System (INIS)

    1990-01-01

    This Construction Completion Report documents the major construction projects at the Waste Isolation Pilot Plant (WIPP) site and related information on contracts, schedules, and other areas which affected construction. This report is not intended to be an exhaustive detailed analysis of construction, but is a general overview and summary of the WIPP construction. 10 refs., 29 figs

  7. UK victims of trafficking

    Directory of Open Access Journals (Sweden)

    Bob Burgoyne

    2006-05-01

    Full Text Available Analysis of court cases shows how hard it is forvictims of trafficking to win the right to remain in the UK. Case law is inconsistent and more research and data collection are urgently needed.

  8. Express-Air Screen-System to protect miners against radon exposures at small underground construction sites in old mining; Express-Wetterblenden-System zum Sofort-Schutz von Bergleuten vor Radonexpositionen bei untertaegigen Bergsicherungsarbeiten im Altbergbau

    Energy Technology Data Exchange (ETDEWEB)

    Dehnert, J. [Saechsisches Landesamt fuer Umwelt, Landwirtschaft und Geologie (Germany). Referat Strahlenschutz; Stopp, J. [Aluminiumbau und Verwaltungs GmbH Stopp, Schneeberg (Germany); Schoenherr, B. [Bergsicherung Schneeberg GmbH (Germany)

    2016-07-01

    A new Express-Air Screen-System (EAS) for miners was developed to reduce the radon exposures of miners at small construction sites of old mining. The EAS is a lightweight, modular and reusable construction kit of interlocking telescopic aluminum tubes, plastic foils and glue foam to shut off radon rich parts of galleries in some minutes only.

  9. STRATÉGIES DE CONSTRUCTION D’UN DISCOURS POSITIF. LE CAS DES SITES WEB DES PRATICIENS DE L’ART DENTAIRE / STRATEGIES OF POSITIVE DISCOURSE CONSTRUCTION. THE CASE OF DENTAL ART PRACTICES WEBSITES

    Directory of Open Access Journals (Sweden)

    Andra-Teodora Porumb

    2017-03-01

    Full Text Available In most cases, before choosing a dentist and request an appointment, the patient gets informed from relatives, friends, and acquaintances. Nowadays he also has the opportunity to make the choice by consulting websites or Facebook pages of dentists. The trust is outlined prior to the meeting itself, before stepping into the cabinet. For good visibility, for attracting and retaining a greater number of patients, for an effective communication with patients as well as for gaining their trust, many dentists have decided to create their websites so as to present the cabinet and their services on the Internet. Moreover, their mere presence on the Internet gives authority and gives the impression of strong, well-prepared, modern and open personalities. If the speech they build manages to calm the fears and anxieties of the patient, if the tone is warm and close to the patient, if the site is attractive, not only informative, the patient will be convinced of the qualities and competence of the doctor and his team, of the fact that they will benefit of quality treatment in a pleasant and modern environment. We consulted numerous sites from different cultural environments – French, Italian and Romanian and, given the size of this paper, we presented the theme construction of the discourse in three of them, from the perspective of the French School of discourse analysis. In our view, the theme construction gives clues on how the organization shapes its identity, being a collective discursive construction. We examined what information was selected to be presented, the way they are organized and prioritized, the layout, titration, the text – photo / audio-visual documents relation. Each and every time we found the concern to provide information and explanations, the focus on some keywords (quality, accuracy, competence, experience, performance, innovation, the constant presence of the word “smile” in the discourse, an important number of images

  10. The UK nuclear power industry

    International Nuclear Information System (INIS)

    Collier, J. G.

    1995-01-01

    In the United Kingdom, nuclear power plants are operated by three companies: Nuclear Electric (NE), Scottish Nuclear (SN), and British Nuclear Fuels plc (BNFL). The state-operated power industry was privatized in 1989 with the exception of nuclear power generation activities, which were made part of the newly founded (state-owned) NE and SN. At the same time, a moratorium on the construction of new nuclear power plants was agreed. Only Sizewell B, the first plant in the UK to be equipped with a pressurized water reactor, was to be completed. That unit was first synchronized with the power grid on February 14, 1995. Another decision in 1989 provided for a review to be conducted in 1994 of the future of the peaceful uses of nuclear power in the country. The results of the review were presented by the government in a white paper on May 9, 1995. Accordingly, NE and SN will be merged and privatized in 1996; the headquarters of the new holding company will be in Scotland. The review does not foresee the construction of more nuclear power plants. However, NE hopes to gain a competitive edge over other sources of primary energy as a result of this privatization, and advocates construction of a dual-unit plant identical with Sizewell B so as to avoid recurrent design and development costs. Outside the UK, the company plans to act jointly with the reactor vendor, Westinghouse, especially in the Pacific region; a bid submitted by the consortium has been shortisted by the future operator of the Lungmen nuclear power plant project in Taiwan. In upgrading the safety of nuclear power plants in Eastern Europe, the new company will be able to work through existing contacts of SN. (orig.) [de

  11. Transport of the first half of the CMS hadronic forward calorimeter (HF) from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France.

    CERN Multimedia

    Florelle Antoine

    2006-01-01

    The two halves of the Forward Hadronic Calorimeter (HF) were transported from the CERN Meyrin site to the surface assembly hall at LHC Point 5 in Cessy, France, during the first part of July. Transporting these 300 tonne objects involved the construction around them of a 65-metre long trailer, simultaneously pushed and pulled by two trucks at either end. The main road between St. Genis and Cessy was closed during these operations and a police escort was provided for the ~5 hour journeys. The two HF halves will be the first major elements to be lowered by the gantry crane into the underground experimental cavern around the end of July or beginning of August.

  12. Transport of the Hadronic Forward (HF) calorimeter from building 186 (CERN Meyrin site) to the CMS construction hall at point 5, Cessy, France.

    CERN Multimedia

    Florelle Antoine

    2006-01-01

    The two halves of the Forward Hadronic Calorimeter (HF) were transported from the CERN Meyrin site to the surface assembly hall at LHC Point 5 in Cessy, France, during the first part of July. Transporting these 300 tonne objects involved the construction around them of a 65-metre long trailer, simultaneously pushed and pulled by two trucks at either end. The main road between St. Genis and Cessy was closed during these operations and a police escort was provided for the ~5 hour journeys. The two HF halves will be the first major elements to be lowered by the gantry crane into the underground experimental cavern around the end of July or beginning of August.

  13. Two-tier Haddon matrix approach to fault analysis of accidents and cybernetic search for relationship to effect operational control: a case study at a large construction site.

    Science.gov (United States)

    Mazumdar, Atmadeep; Sen, Krishna Nirmalya; Lahiri, Balendra Nath

    2007-01-01

    The Haddon matrix is a potential tool for recognizing hazards in any operating engineering system. This paper presents a case study of operational hazards at a large construction site. The fish bone structure helps to visualize and relate the chain of events, which led to the failure of the system. The two-tier Haddon matrix approach helps to analyze the problem and subsequently prescribes preventive steps. The cybernetic approach has been undertaken to establish the relationship among event variables and to identify the ones with most potential. Those event variables in this case study, based on the cybernetic concepts like control responsiveness and controllability salience, are (a) uncontrolled swing of sheet contributing to energy, (b) slippage of sheet from anchor, (c) restricted longitudinal and transverse swing or rotation about the suspension, (d) guilt or uncertainty of the crane driver, (e) safe working practices and environment.

  14. Architects' perspectives on construction waste reduction by design.

    Science.gov (United States)

    Osmani, M; Glass, J; Price, A D F

    2008-01-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.

  15. Architects' perspectives on construction waste reduction by design

    International Nuclear Information System (INIS)

    Osmani, M.; Glass, J.; Price, A.D.F.

    2008-01-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process

  16. Statement about UK referendum on the EU

    CERN Multimedia

    2016-01-01

    Dear Colleagues, Many people have expressed their concerns about the consequences of the 23 June vote in the UK for CERN, and for the UK’s relationship with CERN. CERN is an intergovernmental organisation subject to its own treaty. We are not part of the European Union, and several of our Member States, including Switzerland, in which we are headquartered, are not EU Members. Britain’s membership of CERN is not affected by the UK electorate’s vote to leave the European Union. We look forward to continuing the very constructive relationship we have shared with the UK, one of our founding members, long into the future. CERN was founded on the principle of international collaboration, and our success over the years is built on that. We will continue to work proactively to encourage ever-greater international collaboration in particle physics, and to help ensure that the UK continues to play a very active role. UK nationals remain eligible for all categories of employment at CERN, a...

  17. Floodplain/wetland assessment of the effects of construction and operation ofa depleted uranium hexafluoride conversion facility at the Paducah, Kentucky,site.

    Energy Technology Data Exchange (ETDEWEB)

    Van Lonkhuyzen, R.

    2005-09-09

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF{sub 6} inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This floodplain/wetland assessment has been prepared by DOE, pursuant to Executive Order 11988 (''Floodplain Management''), Executive Order 11990 (Protection of Wetlands), and DOE regulations for implementing these Executive Orders as set forth in Title 10, Part 1022, of the ''Code of Federal Regulations'' (10 CFR Part 1022 [''Compliance with Floodplain and Wetland Environmental Review Requirements'']), to evaluate potential impacts to floodplains and wetlands from the construction and operation of a conversion facility at the DOE Paducah site. Reconstruction of the bridge crossing Bayou Creek would occur within the Bayou Creek 100-year

  18. Rock stability considerations for siting and constructing a KBS-3 repository. Based on experiences from Aespoe HRL, AECL's URL, tunnelling and mining

    Energy Technology Data Exchange (ETDEWEB)

    Martin, C.D. [Univ. of Alberta, Edmonton (Canada); Christiansson, Rolf [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden); Soederhaell, J. [VBB VIAK AB, Stockholm (Sweden)

    2001-12-01

    Over the past 25 years the international nuclear community has carried out extensive research into the deep geological disposal of nuclear waste in hard rocks. In two cases this research has resulted in the construction of dedicated underground research facilities: SKB's Aespoe Hard Rock Laboratory, Sweden and AECL's Underground Research Laboratory, Canada. Both laboratories are located in hard rocks considered representative of the Fennoscandian and Canadian Shields, respectively. This report is intended to synthesize the important rock mechanics findings from these research programs. In particular the application of these finding to assessing the stability of underground openings. As such the report draws heavily on the published results from the SKB's ZEDEX Experiment in Sweden and AECL's Mine- by Experiment in Canada. The objectives of this report are to: 1. Describe, using the current state of knowledge, the role rock engineering can play in siting and constructing a KBS-3 repository. 2. Define the key rock mechanics parameters that should be determined in order to facilitate repository siting and construction. 3. Discuss possible construction issues, linked to rock stability, that may arise during the excavation of the underground openings of a KBS-3 repository. 4. Form a reference document for the rock stability analysis that has to be carried out as a part of the design works parallel to the site investigations. While there is no unique or single rock mechanics property or condition that would render the performance of a nuclear waste repository unacceptable, certain conditions can be treated as negative factors. Outlined below are major rock mechanics issues that should be addressed during the siting, construction and closure of a nuclear waste repository in Sweden in hard crystalline rock. During the site investigations phase, rock mechanics information will be predominately gathered from examination and testing of the rock core and

  19. Rock stability considerations for siting and constructing a KBS-3 repository. Based on experiences from Aespoe HRL, AECL's URL, tunnelling and mining

    International Nuclear Information System (INIS)

    Martin, C.D.; Christiansson, Rolf; Soederhaell, J.

    2001-12-01

    Over the past 25 years the international nuclear community has carried out extensive research into the deep geological disposal of nuclear waste in hard rocks. In two cases this research has resulted in the construction of dedicated underground research facilities: SKB's Aespoe Hard Rock Laboratory, Sweden and AECL's Underground Research Laboratory, Canada. Both laboratories are located in hard rocks considered representative of the Fennoscandian and Canadian Shields, respectively. This report is intended to synthesize the important rock mechanics findings from these research programs. In particular the application of these finding to assessing the stability of underground openings. As such the report draws heavily on the published results from the SKB's ZEDEX Experiment in Sweden and AECL's Mine- by Experiment in Canada. The objectives of this report are to: 1. Describe, using the current state of knowledge, the role rock engineering can play in siting and constructing a KBS-3 repository. 2. Define the key rock mechanics parameters that should be determined in order to facilitate repository siting and construction. 3. Discuss possible construction issues, linked to rock stability, that may arise during the excavation of the underground openings of a KBS-3 repository. 4. Form a reference document for the rock stability analysis that has to be carried out as a part of the design works parallel to the site investigations. While there is no unique or single rock mechanics property or condition that would render the performance of a nuclear waste repository unacceptable, certain conditions can be treated as negative factors. Outlined below are major rock mechanics issues that should be addressed during the siting, construction and closure of a nuclear waste repository in Sweden in hard crystalline rock. During the site investigations phase, rock mechanics information will be predominately gathered from examination and testing of the rock core and mapping of the

  20. The risk of hydraulic fracturing on public health in the UK and the UK's fracking legislation.

    Science.gov (United States)

    Reap, Elisabeth

    2015-01-01

    Hydraulic fracturing to extract natural gas from shale rock is a new, rapidly expanding industry in the United States (US). However, there is concern that these operations could be having large negative impacts such as groundwater contamination, increased air pollution and seismic events. The United Kingdom (UK) is looking at the potential for emulating the success of 'shale gas' in the US. Differences in population density and geological conditions mean that the public health impacts recorded in the US cannot be directly extrapolated to the UK. There is limited academic literature available but findings suggest that the UK government is not fully recognising the inherent risks of hydraulic fracturing exposed by this literature. Government reports suggest a reliance on engineering solutions and better practice to overcome problems found in the US when evidence suggests that there are inherent risks and impacts that cannot be eliminated. This study applies US results to approximate the impact of one exposure pathway, inhalation of hydrocarbons by the public from operational air emissions over the 30 year lifetime of a well and finds that 7.2 extra cancer cases from exposure to air contamination would be expected in the UK if all test sites, approved test sites and test sites awaiting approval as of January 2015 went on to extract gas. In conclusion, limited assessment of the public health implications of hydraulic fracturing operations is available but the UK government appears to not be applying the precautionary principle to potentially significant legislation.

  1. Kyoto commitments: CHP will help the UK

    International Nuclear Information System (INIS)

    Knowles, Michael

    1998-01-01

    In order to meet the United Kingdom's targets for carbon dioxide emissions reduction, agreed at the Kyoto Summit, the UK Government is promoting the use of combined heat and power (CHP) plants. Such schemes need to offer over 70% efficiency, have on-site or nearby heat uses, and allow flexibility for the export of electricity where this is appropriate. Electricity trading arrangements will need to be re-organised in line with similar commodities, in order to facilitate and promote the growth of CHP and renewable energy schemes. Financial incentives and regulation of electricity prices will also contribute to the promotion of CHP schemes, ultimately leading to reduced CO 2 pollution as a result of the growth in the UK's CHP capacity. (UK)

  2. Perspectives of construction robots

    Science.gov (United States)

    Stepanov, M. A.; Gridchin, A. M.

    2018-03-01

    This article is an overview of construction robots features, based on formulating the list of requirements for different types of construction robots in relation to different types of construction works.. It describes a variety of construction works and ways to construct new or to adapt existing robot designs for a construction process. Also, it shows the prospects of AI-controlled machines, implementation of automated control systems and networks on construction sites. In the end, different ways to develop and improve, including ecological aspect, the construction process through the wide robotization, creating of data communication networks and, in perspective, establishing of fully AI-controlled construction complex are formulated.

  3. Training Artisans On-Site

    Directory of Open Access Journals (Sweden)

    Edoghogho Ogbeifun

    2011-09-01

    Full Text Available The decline in apprenticeship in both the public and private sectors, the increasing use of sub-contractors as well as the uncoordinated approach in the informal sector are contributing factors to the shortage of skilled artisans in the construction industry. Artisans training can be introduced and implemented through the adoption of progressive implementation of construction processes commencing work from areas requiring low skill demands to areas of high skill demand. The success of this principle hinges on the collaborative effort of the key project stakeholders. The client should be willing to absorb extra cost and delays in the project; the design and contract documentation should facilitate on-site training, and  the consultant actively guide the contractor and the construction processes to achieve the training objectives. The exploratory research method was adopted in this study and research revealed that this principle was used in a project in the UK and in the development of infrastructure in the tourism industry of South Africa .It is being recommended that the principle be adapted by the public sector for the development of small size infrastructures that can be repeated in many places. This will boost the quality and quantity of artisans, enhance employability, reduce rural urban migration and alleviate poverty.Keywords: Skilled artisans, on-site training, progressive construction processes, project stakeholders, contract documentation. 

  4. Construction of a catalytically inactive cholesterol oxidase mutant: investigation of the interplay between active site-residues glutamate 361 and histidine 447.

    Science.gov (United States)

    Yin, Ye; Liu, Pingsheng; Anderson, Richard G W; Sampson, Nicole S

    2002-06-15

    Cholesterol oxidase catalyzes the oxidation of cholesterol to cholest-5-en-3-one and its subsequent isomerization into cholest-4-en-3-one. Two active-site residues, His447 and Glu361, are important for catalyzing the oxidation and isomerization reactions, respectively. Double-mutants were constructed to test the interplay between these residues in catalysis. We observed that the k(cat) of oxidation for the H447Q/E361Q mutant was 3-fold less than that for H447Q and that the k(cat) of oxidation for the H447E/E361Q mutant was 10-fold slower than that for H447E. Because both doubles-mutants do not have a carboxylate at position 361, they do not catalyze isomerization of the reaction intermediate cholest-5-en-3-one to cholest-4-en-3-one. These results suggest that Glu361 can compensate for the loss of histidine at position 447 by acting as a general base catalyst for oxidation of cholesterol. Importantly, the construction of the double-mutant H447E/E361Q yields an enzyme that is 31,000-fold slower than wild type in k(cat) for oxidation. The H447E/E361Q mutant is folded like native enzyme and still associates with model membranes. Thus, this mutant may be used to study the effects of membrane binding in the absence of catalytic activity. It is demonstrated that in assays with caveolae membrane fractions, the wild-type enzyme uncouples platelet-derived growth factor receptor beta (PDGFRbeta) autophosphorylation from tyrosine phosphorylation of neighboring proteins, and the H447E/E361Q mutant does not. Thus maintenance of membrane structure by cholesterol is important for PDGFRbeta-mediated signaling. The cholesterol oxidase mutant probe described will be generally useful for investigating the role of membrane structure in signal transduction pathways in addition to the PDGFRbeta-dependent pathway tested.

  5. Environmental Assessment for the construction and operation of the Three Rivers Solid Waste Authority regional waste management center at the Savannah River Site

    International Nuclear Information System (INIS)

    1995-12-01

    This Environmental Assessment (EA) has been prepared by the US Department of Energy (DOE) to assess the potential environmental impacts associated with the construction and operation of a landfill and technology center for regionally-generated municipal solid waste at the Savannah River Site (SRS) near Aiken, South Carolina. The facility would serve the municipal solid waste disposal needs for SRS and at least nine of the surrounding counties who currently comprise the Three Rivers Solid Waste Authority (TRSWA). Additional counties could become included in the proposed action at some future date. Current Federal and state requirements do not afford individual counties and municipalities within the region encompassing SRS the ability to efficiently or economically operate modern waste management facilities. In addition, consolidation of regional municipal solid waste at one location would have the benefit of reducing the duplicity of environmental consequences associated with the construction and operation of county-level facilities. The option to seek a combined disposal and technology development facility based on a regionally-cooperative effort was selected as a viable alternative to the existing individual SRS or county disposal activities. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended, the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Part 1021). NEPA requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described for impacts described herein, DOE will either publish a Finding of No Significant Impact or prepare an environmental impact statement (EIS)

  6. Magnetic Moments in the Past: developing archaeomagnetic dating in the UK

    Science.gov (United States)

    Outram, Zoe; Batt, Catherine M.; Linford, Paul

    2010-05-01

    Magnetic studies of archaeological materials have a long history of development in the UK and the data produced by these studies is a key component of global models of the geomagnetic field. However, archaeomagnetic dating is not a widely used dating technique in UK archaeology, despite the potential to produce archaeologically significant information that directly relates to human activity. This often means that opportunities to improve our understanding of the past geomagnetic field are lost, because archaeologists are unaware of the potential of the method. This presentation discusses a project by the University of Bradford, UK and English Heritage to demonstrate and communicate the potential of archaeomagnetic dating of archaeological materials for routine use within the UK. The aims of the project were achieved through the production of a website and a database for all current and past archaeomagnetic studies carried out in the UK. The website provides archaeologists with the information required to consider the use of archaeomagnetic dating; including a general introduction to the technique, the features that can be sampled, the precision that can be expected from the dates and how much it costs. In addition, all archaeomagnetic studies carried out in the UK have been collated into a database, allowing similar studies to be identified on the basis of the location of the sites, the archaeological period and type of feature sampled. This clearly demonstrates how effective archaeomagnetic dating has been in different archaeological situations. The locations of the sites have been mapped using Google Earth so that studies carried out in a particular region, or from a specific time period can be easily identified. The database supports the continued development of archaeomagnetic dating in the UK, as the data required to construct the secular variation curves can be extracted easily. This allows the curves to be regularly updated following the production of new

  7. Construction dust amelioration techniques.

    Science.gov (United States)

    2012-04-01

    Dust produced on seasonal road construction sites in Alaska is both a traffic safety and environmental concern. Dust emanating from : unpaved road surfaces during construction severely reduces visibility and impacts stopping sight distance, and contr...

  8. Improving concrete overlay construction.

    Science.gov (United States)

    2010-03-01

    Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for : construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, ...

  9. UK Mission to CERN

    CERN Multimedia

    2004-01-01

    At the end of June, nine experts from UK industry visited CERN to study techniques for developing distributed computing systems and to look at some specific applications. In a packed three-day programme, almost 40 CERN experts presented a comprehensive survey of achievements.

  10. Wind tunnel tests of biodegradable fugitive dust suppressants being considered to reduce soil erosion by wind at radioactive waste construction sites

    International Nuclear Information System (INIS)

    Ligotke, M.W.; Dennis, G.W.; Bushaw, L.L.

    1993-10-01

    Wind tunnel tests were performed of three fugitive dust control agents derived from potato and sugar beet products. These materials are being considered for use as dust suppressants to reduce the potential for transport of radioactive materials by wind from radioactive waste construction and remediation sites. Soil and dust control agent type, solution concentrations, application quantities, aging (or drying) conditions, surface disturbance, and wind and saltating sand eolian erosive stresses were selected and controlled to simulate application and exposure of excavated soil surfaces in the field. A description of the tests, results, conclusions, and recommendations are presented in this report. The results of this study indicate that all three dust control agents can protect exposed soil surfaces from extreme eolian stresses. It is also clear that the interaction and performance of each agent with various soil types may differ dramatically. Thus, soils similar to that received from ML should be best protected by high concentration (∼2.5%) solutions of potato starch at low water application levels (∼1 to 2 L/m 2 ). Because the effectiveness of PS on this soil type is degraded after a moderate amount of simulated rainfall, other options or additives should be considered if surfaces are to be protected for long intervals or during periods of intermittent rainfall and hot, windy conditions. On the other hand, XDCA should be considered when excavating sandy soils. It should be noted, however, that because the Hanford soil test results are based on a small number of tests, it would be prudent to perform additional tests prior to selecting a fugitive dust control agent for use at the Hanford Site. While fermented potato waste was not the best fixative used on either soil, it did perform reasonably well on both soil types (better than XDCA on Idaho soil and better than PS on Hanford soil)

  11. Site development

    International Nuclear Information System (INIS)

    Noack, J.

    1975-01-01

    The subject of this paper is a general view over all necessary considerations to develop the site after it has been chosen and before starting with the construction of a nuclear power plant. (orig./RW) [de

  12. UK Royal Navy WWII Logbooks

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — In 2006, the UK and NOAA's Climate Database Modernization Program (CDMP) funded the imaging of approximately 8,000 Royal Navy logbooks in the UK National Archives...

  13. Hewitt launches Research Councils UK

    CERN Multimedia

    2002-01-01

    "Trade and Industry Secretary Patricia Hewitt today launched 'Research Councils UK' - a new strategic partnership that will champion research in science, engineering and technology across the UK" (1 page).

  14. Energy and greenhouse gas balance of the use of forest residues for bioenergy production in the UK

    International Nuclear Information System (INIS)

    Whittaker, Carly; Mortimer, Nigel; Murphy, Richard; Matthews, Robert

    2011-01-01

    Life cycle analysis is used to assess the energy requirements and greenhouse gas (GHG) emissions associated with extracting UK forest harvesting residues for use as a biomass resource. Three forest harvesting residues were examined (whole tree thinnings, roundwood and brash bales), and each have their own energy and emission profile. The whole forest rotation was examined, including original site establishment, forest road construction, biomass harvesting during thinning and final clear-fell events, chipping and transportation. Generally, higher yielding sites give lower GHG emissions per ‘oven dried tonne’ (ODT) forest residues, but GHG emissions ‘per hectare’ are higher as more biomass is extracted. Greater quantities of biomass, however, ultimately mean greater displacement of conventional fuels and therefore greater potential for GHG emission mitigation. Although forest road construction and site establishment are “one off” events they are highly energy-intensive operations associated with high diesel fuel consumption, when placed in context with the full forest rotation, however, their relative contributions to the overall energy requirements and GHG emissions are small. The lower bulk density of wood chips means that transportation energy requirements and GHG emissions are higher compared with roundwood logs and brash bales, suggesting that chipping should occur near the end-user of application. -- Highlights: ► GHGs and fuel consumption assessed for UK clear-fell conifer forest residues. ► Energy use and GHG emissions for forest road construction characterised. ► Lower energy requirements and GHG emissions per ODT for higher yielding sites. ► Transport energy and GHG emissions higher for wood chip than roundwood or brash bales. ► Results useful in predicting GHG mitigation potential from UK commercial conifer forest residues.

  15. The UK Government's global partnership programme - Its achievements over the past five years and challenges ahead

    International Nuclear Information System (INIS)

    Heyes, Alan

    2007-01-01

    Through the Global Partnership the UK continues to make a significant contribution to improve national and global security. Over the past year the UK has continued to implement a wide range of projects across the breadth of its Global Partnership Programme. As well as ensuring the Programme is robust and capable of dealing with new challenges, the UK has cooperated with other donor countries to help them progress projects associated with submarine dismantling, scientist redirection, enhancing nuclear security and Chemical Weapons Destruction. The Global Partnership, although only five years old, has already achieved a great deal. Some 23 states, plus the European Union, are now working closer together under the Global Partnership, and collectively have enhanced global regional and national security by reducing the availability of Weapons of Mass Destruction (WMD) materials and expertise to both states of concern and terrorists. Considerable progress has already been made in, for example: - Improving the security of fissile materials, dangerous biological agents and chemical weapons stocks; - Reducing the number of sites containing radioactive materials; - Working towards closure of reactors still producing weapon-grade plutonium; - Improving nuclear safety to reduce the risks of further, Chernobyl style accidents; - Constructing facilities for destroying Chemical Weapons stocks, and starting actual destruction; - Providing sustainable employment for former WMD scientists to reduce the risk that their expertise will be misused by states or terrorists. By contributing to many of these activities, the UK has helped to make the world safer. This paper reports on the UK's practical and sustainable contribution to the Global Partnership and identifies a number of challenges that remain if it is to have a wider impact on reducing the threats from WMD material. (authors)

  16. Liquidity risk and the performance of UK mutual funds

    OpenAIRE

    Foran, Jason; O'Sullivan, Niall

    2014-01-01

    We examine the role of liquidity risk, both as a stock characteristic as well as systematic liquidity risk, in UK mutual fund performance for the first time. Using four alternative measures of stock liquidity we extract principal components across stocks in order to construct systematic or market liquidity factors. We find that on average UK mutual funds are tilted towards liquid stocks (except for small stock funds as might be expected) but that, counter-intuitively, liquidity as a stock cha...

  17. Ammonia emission factors for UK agriculture

    Science.gov (United States)

    Misselbrook, T. H.; Van Der Weerden, T. J.; Pain, B. F.; Jarvis, S. C.; Chambers, B. J.; Smith, K. A.; Phillips, V. R.; Demmers, T. G. M.

    Ammonia (NH 3) emission inventories are required for modelling atmospheric NH 3 transport and estimating downwind deposition. A recent inventory for UK agriculture, estimating emission as 197 kt NH 3-N yr -1, was constructed using 1993 statistical and census data for the UK. This paper describes the derivation of the UK-based emission factors used in the calculation of that emission for a range of livestock classes, farm practices and fertiliser applications to agricultural land. Some emission factors have been updated where more recent information has become available. Some of the largest emission factors derived for each farming practice include 16.9 g NH 3-N dairy cow -1 d -1 for grazing, 148.8 g NH 3-N liveweight unit -1 yr -1 for housed broilers and 4.8 g NH 3-N m -2 d -1 for storage of solid pig and poultry waste as manure heaps. Emissions for land spreading of all livestock waste were 59% of the total ammoniacal nitrogen (TAN) applied as a high dry matter content slurry and 76% of TAN applied as farm yard manure. An updated estimate of emission from UK agriculture, using updated emission factors together with 1997 statistical and census data, is presented, giving a total of 226 kt NH 3-N per year.

  18. UK Tax Update

    Energy Technology Data Exchange (ETDEWEB)

    Deakin, John F.

    1998-07-01

    The presentation deals with the North Sea fiscal regime, a modern system for corporation tax payments, transfer pricing, general anti-avoidance rule for direct taxes, treaty refunds, deductibility of interest for corporation tax, UK/US double taxation convention, and plain and simple tax legislation. Part of the background for the presentation was the fact that in England a new Labour Government had replaced the Conservatives and the new Chancellor had announced a review of the North Sea fiscal regime.

  19. UK Announces Intention to Join ESO

    Science.gov (United States)

    2000-11-01

    Summary The Particle Physics and Astronomy Research Council (PPARC) , the UK's strategic science investment agency, today announced that the government of the United Kingdom is making funds available that provide a baseline for this country to join the European Southern Observatory (ESO) . The ESO Director General, Dr. Catherine Cesarsky , and the ESO Community warmly welcome this move towards fuller integration in European astronomy. "With the UK as a potential member country of ESO, our joint opportunities for front-line research and technology will grow significantly", she said. "This announcement is a clear sign of confidence in ESO's abilities, most recently demonstrated with the construction and operation of the unique Very Large Telescope (VLT) on Paranal. Together we will look forward with confidence towards new, exciting projects in ground-based astronomy." It was decided earlier this year to place the 4-m UK Visible and Infrared Survey Telescope (VISTA) at Paranal, cf. ESO Press Release 03/00. Following negotiations between ESO and PPARC, a detailed proposal for the associated UK/ESO Agreement with the various entry modalities will now be presented to the ESO Council for approval. Before this Agreement can enter into force, the ESO Convention and associated protocols must also be ratified by the UK Parliament. Research and key technologies According to the PPARC press release, increased funding for science, announced by the UK government today, will enable UK astronomers to prepare for the next generation of telescopes and expand their current telescope portfolio through membership of the European Southern Observatory (ESO). The uplift to its baseline budget will enable PPARC to enter into final negotiations for UK membership of the ESO. This will ensure that UK astronomers, together with their colleagues in the ESO member states, are actively involved in global scale preparations for the next generation of astronomy facilities. among these are ALMA

  20. A lean and agile construction system as a set of countermeasures to improve health, safety and productivity in mechanical and electrical construction

    OpenAIRE

    Court, PF; Pasquire, CL; Gibb, AGF

    2009-01-01

    This paper presents certain aspects of the findings of a research project to develop and implement a Lean and agile mechanical and electrical (M&E) Construction System on a case study project. The objective of the research project for the sponsor company is to improve its projects site operations making them safer for the worker and improving efficiency and productivity by overcoming the problems and issues that it faces in the M&E industry within the UK construction sector. The research find...

  1. Seismic risk control of nuclear power plants using seismic protection systems in stable continental regions: The UK case

    Energy Technology Data Exchange (ETDEWEB)

    Medel-Vera, Carlos, E-mail: cbmedel@uc.cl; Ji, Tianjian, E-mail: tianjian.ji@manchester.ac.uk

    2016-10-15

    Highlights: • Strategies to reduce seismic risk for nuclear power stations in the UK are analysed. • Efficiency of devices to reduce risk: viscous-based higher than hysteretic-based. • Scenario-based incremental dynamic analysis is introduced for use in nuclear stations. • Surfaces of seismic unacceptable performance for nuclear stations are proposed. - Abstract: This article analyses three different strategies on the use of seismic protection systems (SPS) for nuclear power plants (NPPs) in the UK. Such strategies are based on the experience reported elsewhere of seismically protected nuclear reactor buildings in other stable continental regions. Analyses are conducted using an example of application based on a 1000 MW Pressurised Water Reactor building located in a representative UK nuclear site. The efficiency of the SPS is probabilistically assessed to achieve possible risk reduction for both rock and soil sites in comparison with conventionally constructed NPPs. Further analyses are conducted to study how the reduction of risk changes when all controlling scenarios of the site are included. This is done by introducing a scenario-based incremental dynamic analysis aimed at the generation of surfaces for unacceptable performance of NPPs as a function of earthquake magnitude (M{sub w}) and distance-to-site (R{sub epi}). General guidelines are proposed to potentially use SPS in future NPPs in the UK. Such recommendations can be used by the British nuclear industry in the future development of 12 new reactors to be built in the next two decades to generate 16 GWe of new nuclear capacity.

  2. The effect of extent of site investigation on the estimation of radiological performance and its relevance to the proposed Rock Characterisation Facility at Sellafield

    International Nuclear Information System (INIS)

    Mackay, R.

    1996-01-01

    Proof of Evidence is given by an expert witness on behalf of Greenpeace Ltd as part of their submission to a Planning Inquiry in 1995 hearing the application of UK Nirex Ltd for permission to construct an underground Rock Characterisation Facility (RCF) at a site near Sellafield. The RCF is part of an investigation by Nirex into a suitable site for the disposal of radioactive waste. The evidence concerns the necessity of establishing an adequate hydrogeological model of the site in advance of the construction of the RCF in order to estimate its radiological performance. This detailed examination of Nirex's approach concludes that it is not apparent that a method for demonstrating the adequacy of the conceptual hydrogeological model has been clearly and openly stated so that it may be agreed in advance of construction with an appropriate authority. (1 figure; 1 table, 12 references). (UK)

  3. Pipeline Decommissioning Trial AWE Berkshire UK - 13619

    Energy Technology Data Exchange (ETDEWEB)

    Agnew, Kieran [AWE, Aldermaston, Reading, RG7 4PR (United Kingdom)

    2013-07-01

    This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes

  4. Managing UK nuclear liabilities

    International Nuclear Information System (INIS)

    Sadnicki, Mike; MacKerron, Gordon.

    1997-01-01

    This paper sets out a framework for a fundamental reappraisal of the management of nuclear liabilities in the United Kingdom, built around two policy objectives, sustainable development and cost-effectiveness. The practical implications of the policy objectives are explored in relation to nuclear liability strategies, such as the adequacy or otherwise of current funding arrangements, the completeness of liability estimates and the distribution of financial responsibility between the public and private sector. A fundamental review of the management of nuclear liabilities is urged in the light of inadequacies identified in this paper. (UK)

  5. Safety in construction industry

    International Nuclear Information System (INIS)

    Khan, A.M.

    1979-01-01

    Causative factors of accidents in construction industry in the context of experience of construction work of the Rajasthan Atomic Power Project are enumerated. The aspect of accident cost - direct and indirect - is discussed briefly. Setting up of a safety set-up at construction sites is emphasized and principles which should guide the accident prevention programme are spelt out. (M.G.B.)

  6. A statistical analysis of UK financial networks

    Science.gov (United States)

    Chu, J.; Nadarajah, S.

    2017-04-01

    In recent years, with a growing interest in big or large datasets, there has been a rise in the application of large graphs and networks to financial big data. Much of this research has focused on the construction and analysis of the network structure of stock markets, based on the relationships between stock prices. Motivated by Boginski et al. (2005), who studied the characteristics of a network structure of the US stock market, we construct network graphs of the UK stock market using same method. We fit four distributions to the degree density of the vertices from these graphs, the Pareto I, Fréchet, lognormal, and generalised Pareto distributions, and assess the goodness of fit. Our results show that the degree density of the complements of the market graphs, constructed using a negative threshold value close to zero, can be fitted well with the Fréchet and lognormal distributions.

  7. UK strategy for nuclear industry LLW - 16393

    International Nuclear Information System (INIS)

    Clark, Matthew; Fisher, Joanne

    2009-01-01

    In March 2007 the UK Government and devolved administrations (for Scotland, Wales and Northern Ireland, from here on referred to as 'Government') published their policy for the management of solid low level waste ('the Policy'). The Policy sets out a number of core principles for the management of low level waste (LLW) and charges the Nuclear Decommissioning Authority with developing a UK-wide strategy in the case of LLW from nuclear sites. The UK Nuclear Industry LLW Strategy has been developed within the framework of the principles set out in the policy. A key factor in the development of this strategy has been the strategic partnership the NDA shares with the Low Level Waste Repository near Drigg (LLWR), who now have a role in developing strategy as well as delivering an optimised waste management service at the LLWR. The strategy aims to support continued hazard reduction and decommissioning by ensuring uninterrupted capability and capacity for the management and disposal of LLW in the UK. The continued availability of a disposal route for LLW is considered vital by both the nuclear industry and non-nuclear industry low level waste producers. Given that the UK will generate significantly more low level waste (∼ 3.1 million m 3 ) than there is capacity at the LLWR (∼0.75 million m 3 ), developing alternative effective ways to manage LLW is critical. The waste management hierarchy is central to the strategy, which includes strategic goals at all levels of the hierarchy to improve its application across the industry. (authors)

  8. [EDRP public local inquiry] Radioactive waste management policy in the UK (with particular reference to Scotland) (Revised statement)

    International Nuclear Information System (INIS)

    Robinson, R.E.S.

    1986-03-01

    The U.K. Government's current strategy for the long term in the management of radioactive wastes with reference to Scotland, taking account of the latest developments, is set out. Areas covered include responsible bodies, environmental monitoring, discharges from UK reprocessing sites, waste from reprocessing of spent fuel from overseas. (U.K.)

  9. Site investigation SFR. Rock type coding, overview geological mapping and identification of rock units and possible deformation zones in drill cores from the construction of SFR

    Energy Technology Data Exchange (ETDEWEB)

    Petersson, Jesper (Vattenfall Power Consultant AB, Stockholm (Sweden)); Curtis, Philip; Bockgaard, Niclas (Golder Associates AB (Sweden)); Mattsson, Haakan (GeoVista AB, Luleaa (Sweden))

    2011-01-15

    This report presents the rock type coding, overview lithological mapping and identification of rock units and possible deformation zones in drill cores from 32 boreholes associated with the construction of SFR. This work can be seen as complementary to single-hole interpretations of other older SFR boreholes earlier reported in /Petersson and Andersson 2010/: KFR04, KFR08, KFR09, KFR13, KFR35, KFR36, KFR54, KFR55, KFR7A, KFR7B and KFR7C. Due to deficiencies in the available material, the necessary activities have deviated somewhat from the established methodologies used during the recent Forsmark site investigations for the final repository for spent nuclear fuel. The aim of the current work has been, wherever possible, to allow the incorporation of all relevant material from older boreholes in the ongoing SFR geological modelling work in spite of the deficiencies. The activities include: - Rock type coding of the original geological mapping according to the nomenclature used during the preceding Forsmark site investigation. As part of the Forsmark site investigation such rock type coding has already been performed on most of the old SFR boreholes if the original geological mapping results were available. This earlier work has been complemented by rock type coding on two further boreholes: KFR01 and KFR02. - Lithological overview mapping, including documentation of (1) rock types, (2) ductile and brittle-ductile deformation and (3) alteration for drill cores from eleven of the boreholes for which no original geological borehole mapping was available (KFR31, KFR32, KFR34, KFR37,KFR38, KFR51, KFR69, KFR70, KFR71, KFR72 and KFR89). - Identification of possible deformation zones and merging of similar rock types into rock units. This follows SKB's established criteria and methodology of the geological Single-hole interpretation (SHI) process wherever possible. Deviations from the standard SHI process are associated with the lack of data, for example BIPS images

  10. Site investigation SFR. Rock type coding, overview geological mapping and identification of rock units and possible deformation zones in drill cores from the construction of SFR

    International Nuclear Information System (INIS)

    Petersson, Jesper; Curtis, Philip; Bockgaard, Niclas; Mattsson, Haakan

    2011-01-01

    This report presents the rock type coding, overview lithological mapping and identification of rock units and possible deformation zones in drill cores from 32 boreholes associated with the construction of SFR. This work can be seen as complementary to single-hole interpretations of other older SFR boreholes earlier reported in /Petersson and Andersson 2010/: KFR04, KFR08, KFR09, KFR13, KFR35, KFR36, KFR54, KFR55, KFR7A, KFR7B and KFR7C. Due to deficiencies in the available material, the necessary activities have deviated somewhat from the established methodologies used during the recent Forsmark site investigations for the final repository for spent nuclear fuel. The aim of the current work has been, wherever possible, to allow the incorporation of all relevant material from older boreholes in the ongoing SFR geological modelling work in spite of the deficiencies. The activities include: - Rock type coding of the original geological mapping according to the nomenclature used during the preceding Forsmark site investigation. As part of the Forsmark site investigation such rock type coding has already been performed on most of the old SFR boreholes if the original geological mapping results were available. This earlier work has been complemented by rock type coding on two further boreholes: KFR01 and KFR02. - Lithological overview mapping, including documentation of (1) rock types, (2) ductile and brittle-ductile deformation and (3) alteration for drill cores from eleven of the boreholes for which no original geological borehole mapping was available (KFR31, KFR32, KFR34, KFR37,KFR38, KFR51, KFR69, KFR70, KFR71, KFR72 and KFR89). - Identification of possible deformation zones and merging of similar rock types into rock units. This follows SKB's established criteria and methodology of the geological Single-hole interpretation (SHI) process wherever possible. Deviations from the standard SHI process are associated with the lack of data, for example BIPS images, or a

  11. Norwegians would - UK wouldn't

    International Nuclear Information System (INIS)

    Ross, David.

    1988-01-01

    The Norwegians are now the world leaders in wave power technology and are exporting oscillating water column power stations to Tonga, Western Samoa, Vanuatu and Bali. The United Kingdom research programme was curtailed, although a wave power unit is being constructed on Islay in the Inner Hebrides. Those who favour nuclear energy generation claim that renewable sources, such as wave power, are uneconomic, but the Norwegians claim that the cost of wave-generated electricity is between 3p and 8p depending on local conditions. The economic case for nuclear power over renewables that will be presented at the Hinkley Point C Inquiry is thus less convincing. (U.K.)

  12. Multiple lifestyle behaviours and overweight and obesity among children aged 9-11 years: results from the UK site of the International Study of Childhood Obesity, Lifestyle and the Environment.

    Science.gov (United States)

    Wilkie, Hannah J; Standage, Martyn; Gillison, Fiona B; Cumming, Sean P; Katzmarzyk, Peter T

    2016-02-24

    The purpose of this study was to explore the independent associations between multiple lifestyle behaviours (physical activity, sleep, screen time (ST) and diet) and overweight and obesity in UK children. The second objective was to compare body mass index (BMI) z-score between children who meet health guidelines for each lifestyle behaviour and those who do not and to explore the impact of interactions between lifestyle behaviours on BMI z-score. Cross-sectional study on children aged 9-11 years in the UK (n=374). Participants were classified as overweight or obese using the WHO BMI cut-points. Moderate-to-vigorous intensity physical activity (MVPA) and sleep duration were measured using an ActiGraph GT3X+ accelerometer, whereas ST and dietary habits were assessed using questionnaires. Multilevel multiple logistic regression was employed to analyse associations between lifestyle behaviours and overweight/obesity. Participants were then categorised according to whether or not they met specific health criteria for MVPA, ST, sleep and diet. Multilevel multiple linear regression was used to compare these groupings on the outcome of BMI z-score and interactions were explored. MVPA and longer sleep duration were associated with lower odds of overweight or obesity, whereas ST and a healthy diet score were associated with increased odds of overweight/obesity. No association was found for an unhealthy diet score. Meeting MVPA guidelines was significantly associated with a lower BMI z-score in all models, and significant two-way interactions were observed for physical activity and sleep, ST and sleep, and physical activity and diet. MVPA, sleep and ST are important lifestyle behaviours associated with overweight/obesity among children. More research is required to confirm the role of diet on adiposity and such work would benefit from objective assessment. Overall, this work suggests that strategies aimed at improving compliance with health guidelines are needed. NCT01722500

  13. Computer modelling of the UK wind energy resource: UK wind speed data package and user manual

    Energy Technology Data Exchange (ETDEWEB)

    Burch, S F; Ravenscroft, F

    1993-12-31

    A software package has been developed for IBM-PC or true compatibles. It is designed to provide easy access to the results of a programme of work to estimate the UK wind energy resource. Mean wind speed maps and quantitative resource estimates were obtained using the NOABL mesoscale (1 km resolution) numerical model for the prediction of wind flow over complex terrain. NOABL was used in conjunction with digitised terrain data and wind data from surface meteorological stations for a ten year period (1975-1984) to provide digital UK maps of mean wind speed at 10m, 25m and 45m above ground level. Also included in the derivation of these maps was the use of the Engineering Science Data Unit (ESDU) method to model the effect on wind speed of the abrupt change in surface roughness that occurs at the coast. With the wind speed software package, the user is able to obtain a display of the modelled wind speed at 10m, 25m and 45m above ground level for any location in the UK. The required co-ordinates are simply supplied by the user, and the package displays the selected wind speed. This user manual summarises the methodology used in the generation of these UK maps and shows computer generated plots of the 25m wind speeds in 200 x 200 km regions covering the whole UK. The uncertainties inherent in the derivation of these maps are also described, and notes given on their practical usage. The present study indicated that 23% of the UK land area had speeds over 6 m/s, with many hill sites having 10m speeds over 10 m/s. It is concluded that these `first order` resource estimates represent a substantial improvement over the presently available `zero order` estimates. (18 figures, 3 tables, 6 references). (author)

  14. UK Natural Analogue Coordinating Group: fourth annual report

    International Nuclear Information System (INIS)

    Read, D.; Hooker, P.J.

    1992-01-01

    HMIP has a research programme investigating some naturally radioactive sites as geochemical analogues of radionuclide migration. All of the analogue sites under investigation, both in the U.K. and overseas, are located where elevated uranium concentrations occur naturally. Coordination of the programme is achieved through the UK Natural Analogue Co-ordinating Group (NACG) which has met three times in this reporting period. The NACG is steered by the British Geological Survey. Its purpose is to ensure that the different research projects have an integrated function aimed at increasing our understanding of natural geochemical processes. Effort is also being expended in testing research models which may be used in such assessments. (author)

  15. Wind energy - current status in the UK

    International Nuclear Information System (INIS)

    Lindley, D.

    1995-01-01

    Twenty two windfarms are operational or are under construction in the U.K. They have a total installed capacity of approximately 140 MW and will generate about 360 GWh in a full year and provide the electricity needs of about 250 000 individuals and save the emission of about 400 000 tonnes of CO 2 each year. Developments so far have required an investment of about Pound 140 million provided mostly by banks and large corporate investors. Financing these projects has broken new ground for renewable technologies and established a framework for the financing of windfarms built using future NFFO contracts. Obtaining planning consents for these windfarms has involved thirteen public inquiries, eight of which have been successful. Four of these remain unused and the result of another is awaited. Statutory and other bodies have responded to the rapid deployment of windfarms by issuing guidelines and these together with Public Inquiry documentation now provide invaluable guidance for the industry. The U.K. market is arguably the most 'open' in Europe and Danish Wind Turbine manufacturers have gained over 50 per cent of the total market. A Japanese manufacturer has gained 25 per cent whilst the major U.K. turbine supplier has gained 17 per cent market share. There are still over thirty manufacturers worldwide and signs that a combination of innovation and market pressures are continuing to reduce the costs of wind energy. (author)

  16. Site Practice

    DEFF Research Database (Denmark)

    Wahedi, Haseebullah

    2016-01-01

    different practices in the construction phase. The research is based on an ethnographic study of a case in Denmark. The empirical data were collected through direct observations and semi-structured interviews with site managers, contract managers, foremen and craftsmen. Findings revealed...... that the construction phase comprises several communities and practices, leading to various uses of the drawings. The results indicated that the craftsmen used drawings to position themselves in the correct location, and that the site managers and contract managers used them as management tools and legal documents...

  17. Site operations

    International Nuclear Information System (INIS)

    House, W.B.; Ebenhack, D.G.

    1989-01-01

    This chapter is a discussion of the management and operations practices used at the Barnwell Waste Management Facility in Barnwell, SC. The following topics are discussed: (1) Waste receiving and inspection, including manifest and certificates of compliance, radiological surveys, disposition of nonconforming items, and decontamination and disposition of secondary waste streams; (2) Waste disposal, including Title 10 CFR 61 requirements, disposal area evaluations, shipment offloading, container emplacement, and radiation protection; (3) Trench closure, including trench backfilling, trench capping, and permanent markers; (4) Site maintenance and stabilization, including trench maintenance, surface water management, and site closure activities; (5) Site monitoring programs, including operational monitoring, and environmental monitoring program; (6) Personnel training and qualifications, including basic training program, safety training program, special skills training, and physical qualifications; (7) Records management, including waste records, personnel training records, personnel dosimetry records, site monitoring records, trench qualification and construction records, and site drawings and stabilization records; (8) Site security; (9) Emergency response plans; and (10) Quality assurance

  18. Solar energy: a UK assessment

    Energy Technology Data Exchange (ETDEWEB)

    1976-01-01

    A panel convened by UK-ISES to analyze all aspects of solar energy systems and to assess the potential for solar energy utilization and research and development needs in the UK and for export is reported. Topics covered include: solar energy in relation to other energy sources; international solar energy research and development program; the physical nature of solar energy and its availability in the UK and other countries; thermal collection, storage, and low-temperature applications; solar energy and architecture; solar thermal power systems; solar cells; agricultural and biological systems; photochemical systems; social, legal, and political considerations with particular reference to the UK; and future policy on solar research and development for the UK. (WDM)

  19. UK reactor decommissioning strategy

    International Nuclear Information System (INIS)

    Woollam, P.B.

    2004-01-01

    With the cessation of electricity generation, nuclear power stations move into the next stage of the overall life cycle of the facility: decommissioning. Decommissioning is defined as the process whereby a nuclear facility, at the end of its economic life, is taken permanently out of service and its site made available for other purposes. This involves the implementation of a structured and safe programme for dismantling and clearing the site and making it available for alternative use in the future. In practical terms, 'decommissioning' means the systematic and progressive reduction of hazards to the point where the site could eventually be de-licensed. (author)

  20. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J. [CH2M HILL Plateau Remediation Company, P.O. Box 1600, MSIN R4-41, 99352 (United States)

    2013-07-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

  1. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    International Nuclear Information System (INIS)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2012-01-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W PandT) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012

  2. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    International Nuclear Information System (INIS)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    2013-01-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

  3. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Ostrom, Michael J. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Freeman-Pollard, Jhivaun R. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2012-11-14

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.

  4. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2013-01-11

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.

  5. Application of BAT assessments for sampling and monitoring techniques in the UK EPR

    International Nuclear Information System (INIS)

    Kerdaniel, Erwan du Fou de; Colin, Julie; Moyano, Florian; Ardon, Audrey

    2014-01-01

    EDF Energy intends to build two EPR units at the Hinkley Point C site and has initiated the studies to build two more EPR units at Sizewell C. The project is lead by NNB GenCo, a subsidiary of EDF Energy. NNB GenCo, identified as the future operator and intelligent customer, relies upon EDF SA's expertise as responsible designer. UK EPR design substantiation has been carried out during the Generic Design Assessment (GDA), with two key reports, namely the Pre-Construction Environmental Report and the Pre-Construction Safety Report. These reports lead to specific enquiries initiated by the Regulators through 'Assessment Findings' in all areas, including Chemistry. Along the GDA process, the Environmental Agency (EA) has authorised chemical and radiochemical effluents discharges, requiring NNB GenCo to demonstrate that Best Available Techniques (BAT) are used to sample and monitor the discharges and the generation of solid wastes. BAT demonstrations deliverables are formalised via 'Commitment Plans' and detailed within 'Environmental Optimisation Studies (EOS)' reports, in line with NNB GenCo's management arrangements. NNB GenCo manages the production of the EOS reports. EDF CEIDRE Laboratory department (CEIDRE/DLAB) has been identified as a contributor to the BAT demonstration regarding sampling and monitoring of chemical effluents, active effluents and solid wastes. As required by the definition of BAT in the UK context, demonstrations are based on: UK Regulatory context and associated specific requirements, International feedback analysis of European, EPRI and IAEA documents, French fleet framework: benchmarks with the operator, analysis of technical and operational management documentation, Sizewell B framework: benchmarks with the operator, analysis of technical and operational management documents, International, British and French standards. A close partnership between the different EDF SA departments and a clear

  6. Innovative UK Approaches to Acquisition Management

    Science.gov (United States)

    2009-05-01

    Financial and Operational Imperatives Size of UK armed forces UK Industry ? Political influence PFI / PPP Increased Scrutiny - NAO “ Commercialisation “ of the...acquisition KNOWLEDGE (EXPERIENCE – Lessons learned) KNOWLEDGE (Training) KNOWLEDGE ( Education ) OPTIMAL OPERATIONAL PERFORMANCE Operational Capability UK

  7. Proposed Use of a Constructed Wetland for the Treatment of Metals in the S-04 Outfall of the Defense Waste Processing Facility at the Savannah River Site

    International Nuclear Information System (INIS)

    Glover, T.

    1999-01-01

    The DWPF is part of an integrated waste treatment system at the SRS to treat wastes containing radioactive contaminants. In the early 1980s the DOE recognized that there would be significant safety and cost advantages associated with immobilizing the radioactive waste in a stable solid form. The Defense Waste Processing Facility was designed and constructed to accomplish this task

  8. Industrial hygiene survey report of Millstone Nuclear Power Station No. 3 construction site (Northeast Utilities Service Co./Stone and Webster Engineering Corp.) Waterford, Connecticut

    International Nuclear Information System (INIS)

    Zaebst, D.D.; Herrick, R.H.

    1985-11-01

    The purpose of the study was to conduct an in-depth industrial hygiene survey to determine exposures of painters to coating components during the construction of a nuclear power plant. The survey was conducted as part of the Industrywide Studies Branch survey of Health Hazards in the Painting Trades

  9. Proposed Use of a Constructed Wetland for the Treatment of Metals in the S-04 Outfall of the Defense Waste Processing Facility at the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Glover, T.

    1999-11-23

    The DWPF is part of an integrated waste treatment system at the SRS to treat wastes containing radioactive contaminants. In the early 1980s the DOE recognized that there would be significant safety and cost advantages associated with immobilizing the radioactive waste in a stable solid form. The Defense Waste Processing Facility was designed and constructed to accomplish this task.

  10. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  11. Site development

    International Nuclear Information System (INIS)

    Gaynor, R.K.

    1989-01-01

    Development of a low-level radioactive waste land disposal facility is little different than any industrial development of similar scope. Consideration must be made for normal business and operations management, security, facility maintenance, traffic control and necessary amenities for personnel. The item specific to the low-level waste site is the handling of radioactive waste materials and the regulatory and environmental protection procedures that must be planned for and accomodated in the site design and development. Each of these elements and the facility as a whole must be designed to be compatible with local land use plans, available transportation and support services, and the social and economic goals of the local community. Plans should also be made for quality control and orderly construction. This chapter deals with those aspects of the facility, its design and construction which are integral parts to the overall performance of the site

  12. The Traveller Fórum : An Advice-seeking Site Contributing to the Construction of Parental Social Actors and to On-line Parental Bond Creations

    OpenAIRE

    Dolón Herrero, Rosana

    2014-01-01

    This paper studies how parental social actors and co-parental relationships are interactively constructed in traveller forums, analysing a corpus obtained from the London for Kids Trip Advisor forum, and carrying out a qualitative study of the interactants¿ uses of kids in their choice of transitivity patterns. Starting from a Critical Discourse Analytical methodological framework and from corpus-driven research, I address the question of how participants are endowed with authority and legiti...

  13. Application of frequency- and time-domain electromagnetic surveys to characterize hydrostratigraphy and landfill construction at the Amargosa Desert Research Site, Beatty, Nevada

    Science.gov (United States)

    White, Eric A.; Day-Lewis, Frederick D.; Johnson, Carole D.; Lane, John W.

    2016-01-01

    In 2014 and 2015, the U.S. Geological Survey (USGS), conducted frequency-domain electromagnetic (FDEM) surveys at the USGS Amargosa Desert Research Site (ADRS), approximately 17 kilometers (km) south of Beatty, Nevada. The FDEM surveys were conducted within and adjacent to a closed low-level radioactive waste disposal site located at the ADRS. FDEM surveys were conducted on a grid of north-south and east-west profiles to assess the locations and boundaries of historically recorded waste-disposal trenches. In 2015, the USGS conducted time-domain (TDEM) soundings along a profile adjacent to the disposal site (landfill) in cooperation with the U.S. Environmental Protection Agency (USEPA), to assess the thickness and characteristics of the underlying deep unsaturated zone, and the hydrostratigraphy of the underlying saturated zone.FDEM survey results indicate the general location and extent of the waste-disposal trenches and reveal potential differences in material properties and the type and concentration of waste in several areas of the landfill. The TDEM surveys provide information on the underlying hydrostratigraphy and characteristics of the unsaturated zone that inform the site conceptual model and support an improved understanding of the hydrostratigraphic framework. Additional work is needed to interpret the TDEM results in the context of the local and regional structural geology.

  14. Construction of Insulin 18-mer Nanoassemblies Driven by Coordination to Iron(II) and Zinc(II) Ions at Distinct Sites

    DEFF Research Database (Denmark)

    Munch, Henrik K.; Nygaard, Jesper; Christensen, Niels Johan

    2016-01-01

    Controlled self-assembly (SA) of proteins offers the possibility to tune their properties or to create new materials. Herein, we present the synthesis of a modified human insulin (HI) with two distinct metal-ion binding sites, one native, the other abiotic, enabling hierarchical SA through...

  15. Funding Decommissioning - UK Experience

    International Nuclear Information System (INIS)

    MacKerron, Gordon

    2006-01-01

    'Funding' started with CEGB and SSEB (state-owned electric utilities) in 1976 using the internal un-segregated fund route (i.e unfunded). This continued until privatisation of electricity industry (excluding nuclear) in 1990. Assets bought with the internal un-segregated fund were mostly transferred into non-nuclear private utilities. New state-owned Nuclear Electric (England and Wales) was given a 'Fossil Fuel Levy', a consumer charge of 10% on retail bills, amounting to c. BP 1 bn. annually. This allowed Nuclear Electric to trade legally (A reserve of BP 2.5 bn. was available from Government if company ran out of money). By 1996 the newer nuclear stations (AGRS plus PWR) were privatised as British Energy. British Energy started an external segregated fund, the Nuclear Decommissioning Fund, with a starting endowment of c. BP 225 m. - and BE made annual contributions of British Pound 16 m. into the Fund. Assumptions were that BE had 70 to accumulate cash and could get a 3.5% average annual real return. Older stations (Magnox) were left in private sector and went to BNFL in 1997. Magnox inherited the surplus cash in BE - mostly unspent Fossil Fuel Levy receipts - of c. BP 2.6 bn. Government gave an 'Undertaking' to pay BP 3.8 bn. (escalating at 4.5% real annually) for Magnox liabilities, should Magnox Electric run out of cash. BNFL inherited the BP 2.6 bn. and by 2000 had a 'Nuclear Liabilities Investment Portfolio' of c. BP 4 bn. This was a quasi-segregated internal fund for liabilities in general. [Note: overall UK nuclear liabilities in civilian sector were running at c. BP 48 bn. by now]. BE started profitable and paid BP 100 m. annually in dividends to private investors for several years. BE ran into severe financial problems after 2001 and Government organised restructuring aid, now approved by European Commission. Terms include: - BE now to contribute BP 20 m. a year into an expanded Nuclear Liabilities Fund; - A bond issue of BP 275 m. to go to Fund; - 65

  16. "UK today" Tallinnas / Tuuli Oder

    Index Scriptorium Estoniae

    Oder, Tuuli, 1958-

    2001-01-01

    Vabariikliku inglise keele olümpiaadi raames toimus Tallinnas viktoriini "UK today" lõppvoor. Osalesid 22 kooli kaheliikmelised võistkonnad. Viktoriini tulemused koolide lõikes ja küsimused õigete vastustega

  17. Construction gets underway on Hungary's Modern Vault Dry Store

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    A construction licence has recently been granted for a Modular Vault Dry Store (MVDS) for spent fuel at the Paks reactor site in Hungary. The store will be used for medium term (50 years) storage of spent fuel from four VVER-440 reactors. It is anticipated that storage capacity for 1350 fuel assemblies will be available by 1996. Two further construction phases will take the capacity to 4950, covering the first ten years of reactor operation. The design provides for further extension to accommodate a total 15000 assemblies, corresponding to 30 years of reactor operation. The MVDS has developed out of the first application of dry store technology to spent Magnox reactor fuel at the Wylfa power station in the United Kingdom 25 years ago. (UK)

  18. Sizewell 'B' PWR pre-construction safety report

    International Nuclear Information System (INIS)

    1982-04-01

    The Pre-Construction Safety Report (PCSR) for a PWR power station to be constructed as Sizewell 'B' is presented in 13 volumes containing 16 chapters. The PCSR has been submitted to the Nuclear Installations Inspectorate in support of the Central Electricity Generating Board's application for consent to the extension at Sizewell. It describes the design and provides the safety case for the proposed station, which comprises a 4-loop pressurized water reactor with associated generating plant and supporting auxiliary equipment. A general description of the station and its site is given. The strategy for ensuring nuclear safety is set out and the general design aspects of systems and plant outlined. The plant and systems, including their safety design bases and the fault analyses carried out for the design are described. Finally the way in which the plant will be decommissioned at the end of its useful life is outlined. (U.K.)

  19. The Role of the Sellafield Ltd Centres of Expertise in Engaging with the Science, Environment and Technology Supply Chain and University Sector to Support Site Operations and Decommissioning in the UK Nuclear Industry - 13018

    Energy Technology Data Exchange (ETDEWEB)

    Butcher, Ed [Uranium and Reactive Metals Centre of Expertise Lead, Technical Directorate, Sellafield Ltd, Sellafield, Seascale, Cumbria CA20 1PG (United Kingdom); Connor, Donna [Technical Capability Manager, Technical Directorate, Sellafield Ltd, Sellafield, Seascale, Cumbria CA20 1PG (United Kingdom); Keighley, Debbie [Head of Profession, Technical Directorate, Sellafield Ltd, Sellafield, Seascale, Cumbria CA20 1PG (United Kingdom)

    2013-07-01

    The development and maintenance of the broad range of the highly technical skills required for safe and successful management of nuclear sites is of vital importance during routine operations, decommissioning and waste treatment activities.. In order to maintain a core team of technical experts, across all of the disciplines required for these tasks, the approach which has been taken by the Sellafield Ltd has been the formation of twenty five Centres of Expertise (CoE), each covering key aspects of the technical skills required for nuclear site operations. Links with the Specialist University Departments: The CoE leads are also responsible for establishing formal links with university departments with specialist skills and facilities relevant to their CoE areas. The objective of these links is to allow these very specialist capabilities within the university sector to be more effectively utilized by the nuclear industry, which benefits both sectors. In addition to the utilization of specialist skills, the university links are providing an important introduction to the nuclear industry for students and researchers. This is designed to develop the pipeline of potential staff, who will be required in the future by both the academic and industrial sectors. (authors)

  20. The Role of the Sellafield Ltd Centres of Expertise in Engaging with the Science, Environment and Technology Supply Chain and University Sector to Support Site Operations and Decommissioning in the UK Nuclear Industry - 13018

    International Nuclear Information System (INIS)

    Butcher, Ed; Connor, Donna; Keighley, Debbie

    2013-01-01

    The development and maintenance of the broad range of the highly technical skills required for safe and successful management of nuclear sites is of vital importance during routine operations, decommissioning and waste treatment activities.. In order to maintain a core team of technical experts, across all of the disciplines required for these tasks, the approach which has been taken by the Sellafield Ltd has been the formation of twenty five Centres of Expertise (CoE), each covering key aspects of the technical skills required for nuclear site operations. Links with the Specialist University Departments: The CoE leads are also responsible for establishing formal links with university departments with specialist skills and facilities relevant to their CoE areas. The objective of these links is to allow these very specialist capabilities within the university sector to be more effectively utilized by the nuclear industry, which benefits both sectors. In addition to the utilization of specialist skills, the university links are providing an important introduction to the nuclear industry for students and researchers. This is designed to develop the pipeline of potential staff, who will be required in the future by both the academic and industrial sectors. (authors)

  1. Decommissioning of the gaseous diffusion plant at BNF plc Capenhurst in the UK

    International Nuclear Information System (INIS)

    Clements, D.W.; Cross, J.R.

    1993-01-01

    Since 1982, a gaseous diffusion plant located at the British Nuclear Fuels plc (BNFL) site at Capenhurst in the United Kingdom, has been undergoing decontamination, decommissioning, and dismantling. By March 1994, the decontamination and decommissioning activities will be complete with 99% of the materials used to construct the plant recycled to the environment as clean material. This paper describes the history of the decontamination, decommissioning, dismantling, and disposal program. Reference is made to the scale of the project and to the special techniques developed, particularly in the areas of size reduction, decontamination, and protection of personnel and the environment. The quantities of material involved that require decontamination and release levels for recycling materials in the U.K. metals market are discussed

  2. Well-construction and hydrogeologic data for observation wells in the vicinity of a low-level radioactive-waste disposal site near Sheffield, Illinois

    Science.gov (United States)

    Mansue, Lawrence J.; Mills, Patrick C.

    1991-01-01

    The U.S. Geological Survey conducted hydrogeologic studies at the low-level radioactive-waste disposal site near Sheffield, Illinois, from 1976 through 1987. During that period, 108 observation wells were installed in the vicinity of the disposal site in glacial and post-glacial deposits of Quaternary age and bedrock of Pennsylvanian age. Data in this report include the location of each well, the date each well was drilled, the geologic units penetrated by each well, the physical measurements of each well, the elevations of the top (measuring point) of each well and geologic-unit contacts at each well, and the highest and lowest recorded water levels in each well.

  3. Demosite - Demonstration of the integration of photovoltaic elements in buildings; DEMOSITE. Site de demonstration d'elements de construction photovoltaiques integres au batiment

    Energy Technology Data Exchange (ETDEWEB)

    Roecker, C.; Affolter, P.; Muller, A.N.; Ould-Yenia, A.

    2003-07-01

    This final report for the Swiss Federal Office of Energy summarises Phase 4 of the DEMOSITE project and concludes 10 years of DEMOSITE activities. The DEMOSITE project, started in 1992, demonstrates various ways of integrating photovoltaic elements in buildings by providing stands, pavilions and monitoring facilities at its site in Lausanne, Switzerland. Here, at the Swiss Federal Institute of Technology, roof-mounted installations can be found as well as mock-ups of buildings and roofing systems that also serve as covered parking facilities. The DEMOSITE web site and graphical presentations are also reviewed. Furthermore, the six newest pavilions are presented in detail. The report also presents several sets of data from measurements made on the installations and discusses the dissemination of information and results obtained from the project. A comprehensive annex provides illustrations of examples of building-integrated photovoltaics from around the world.

  4. Innovate the Teaching of Taiwaness History: An Application of Multimedia Distance Learning—A Web-site Construction Sample of Shih Hsin University

    Directory of Open Access Journals (Sweden)

    Shaw-Fong Lee

    2004-03-01

    Full Text Available Traditionally, the teaching of history course mostly utilizes face to face instruction and oral presentation. Along with the development of educational technology, the teaching methods could be more various such as using internet and multimedia. Literature reviews also indicate that using internet and multimedia may improve the effect of learning and teaching. This paper explores the development of a web-based instructional system for the course of Taiwanese History at Shih Hsin University.The result and the product of this development project is the web site, http://distance.shu.edu.tw/taiwan/list.htm. The content of the web-site includes instructional materials such as animations, videos, pictures, texts, historical maps, and so on. The developmental methods used in this project use curriculum design, survey, interview, review of literatures and focus group discussion.[Article content in Chinese

  5. The UK radiotherapy dosimetry audit network

    International Nuclear Information System (INIS)

    Thwaites, D.I.

    2002-01-01

    Full text: Radiotherapy dosimetry intercomparison in the UK has been carried out in limited studies since the 1960s. However the first national dosimetry intercomparison involving all radiotherapy centres was conducted in the late 1980s. This was based on visits to each centre, using ionisation chamber dosimetry. It audited megavoltage photon beam calibration and other single field parameters. It also measured doses in a three-field 'treatment' in a trapezoidal phantom constructed from epoxy-resin water-equivalent material and compared these to locally planned doses. This included off-axis points, oblique incidence, inhomogeneities, etc. The study found mean measured beam calibration doses close to stated values (ratio 1.003), with a standard deviation (sd) of the distribution of 1.5% and 97% of doses within the pro-set 3% tolerance. For the planned multi-field irradiations, mean dose ratios (measured/stated) were 1.01 (sd 3%, 90% of results within 5%). A number of discrepancies were identified, leading to improved practice. A follow up study (mid-1990s) for electron beam audit also repeated the megavoltage photon calibration audit. For photons, an improvement was noted (mean ratio 1.003, sd 1.0%, 100% within 3%), whilst for electron beams, the mean ratio of measured/stated dose was 0.994 (sd 1.8%, 94% within 3%, 99% within 5%). In parallel with - and growing out of - this, a national audit network began to develop in 1991/2. It utilised similar methodology to the intercomparison and a network approach to allow parallel developments of the scope of the system. The network has eight regional groups, each with up to 10 radiotherapy centres, serving average populations of 7-8 million. Each group organises audits of its own centres and has developed at its own pace. Most have piloted methodology, phantoms, etc. for new audits which can then be used by other groups. All 65 UK centres are included. The network is co-ordinated by an IPEM Steering Committee (current chair

  6. HITACHI construction CAE system

    International Nuclear Information System (INIS)

    Yoshida, M.

    1994-01-01

    Construction and maintenance of nuclear power plants have important problems such as shortening the construction period and reducing the construction cost. Recently, the problem of insufficient construction labor has arisen, and as drastic strategic development has become a necessary counter-measure. The following four principles are included in the measures to be taken for efficient execution of the construction work within the short construction period: (1) reduction of on-site work and expansion of module block making, (2)improvement of the accuracy of the on-site work process, adjustment and expansion of the work in parallel with the construction process, (3)improvement of efficiency of the on-site work and mechanization and automation of the work, (4)improvement of the accuracy of the management of the construction. A three dimensional simulation system plant construction plan CAE, comprising five modules has been developed. A project management system was also developed to improve the accuracy and efficiency of management work in the field

  7. Geologic and well-construction data for the H-10 borehole complex near the proposed Waste Isolation Pilot Plant site, southeastern New Mexico

    International Nuclear Information System (INIS)

    Wells, J.G.; Drellack, S.L. Jr.

    1983-01-01

    The H-10 borehole complex, a group of three closely spaced boreholes, is located 4 miles southeast of the proposed Waste Isolation Pilot Plant site in west-central Lea County, New Mexico. The holes were drilled during August and October 1979 to obtain geologic and hydrologic data to better define the regional ground-water-flow system. The geologic data presented in this report are part of a site-characterization study for the possible storage of defense-associated radioactive wastes within salt beds of the Salado Formation of Permian age. The geologic data include detailed descriptions of cores, cuttings, and geophysical logs. Each borehole was designed to penetrate a distinct water-bearing zone: H-10a (total depth 1318 feet) was completed just below the Magenta Dolomite Member of the Rustler Formation of Permian age; H-10b (total depth 1398 feet) was completed just below the Culebra Dolomite Member of the Rustler Formation; and H-10c (total depth 1538 feet) was completed below the Rustler Formation-Salado Formation contact. The geologic units penetrated in borehole H-10c are surficial alluvium and eolian sand of Holocene age (0 to 5 feet); the Mescalero caliche (5 to 9 feet) and the Gatuna Formation (9 to 90 feet) of Pleistocene age: formations in the Dockum Group (Chinle Formation, 90 to 482 feet and Santa Rosa Sandstone, 482 to 658 feet) of Late Triassic age; and the Dewey Lake Red Beds (658 to 1204 feet), the Rustler Formation (1204 to 1501 feet), and part of the Salado Formation (1501 to 1538 feet), all of Permian age. The sections of the Rustler and Salado Formations penetrated by borehole H-10c are complete and contain little or no evidence of dissolution of halite and associated rocks, indicating that the eastward-moving dissolution within the Rustler or on top of the Salado, found west of the Waste Isolation Pilot Plant site, has not reached the H-10 site

  8. Geologic and well-construction data for the H-8 borehole complex near the proposed Waste Isolation Pilot Plant site, southeastern New Mexico

    Science.gov (United States)

    Wells, J.G.; Drellack, S.L.

    1982-01-01

    The H-8 complex, a group of three closely-spaced boreholes, is located 9 miles south of the proposed Waste Isolation Pilot Plant site in southeastern Eddy County, New Mexico. The holes were drilled during July, August, and September of 1979 to obtain geologic and hydrologic data to better define the regional ground-water-flow system. The geologic data presented in this report are part of a site-characterization study for the possible disposal of defense-associated radioactive wastes within salt beds of the Salado Formation of Permian age. The geologic data include detailed descriptions of cores, cuttings, and geophysical logs. Each borehole was designed to penetrate a distinct water-bearing zone: H-8a (total depth 505 feet) was completed just below the Magenta Dolomite Member of the Rustler Formation of Permian Age; H-8b (total depth 624 feet) was completed just belows the Culebra Dolomite Member of the Rustler Formation; and H-8c (total depth 808 feet) was completed just below the Rustler Formation-Salado Formation contact. The geologic units penetrated in borehole H-8c are surficial alluvium and eolian sand of Holocene age (0-4 feet); the Mescalero caliche (4-10 feet) and Gatuna Formation (10-153 feet) , both of Pleistocene age; and the Dewey Lake Red Beds (153-399 feet), the Rustler Formation (399-733 feet), and part of the Salado Formation penetrated by borehole H-8c is composed of residue from dissolution of halite and associated rocks, and the hydration of anhydrite to gypsum, indicating that the eastward-moving dissolution front on top of the Salado, found just to the west of the WIPP site, has reached the H-8 site. (USGS)

  9. Geologic and well-construction data for the H-9 borehole complex near the proposed Waste Isolation Pilot Plant site, southeastern New Mexico

    Science.gov (United States)

    Drellack, S.L.; Wells, J.G.

    1982-01-01

    The H-9 complex, a group of three closely spaced boreholes, is located 5.5 miles south of the proposed Waste Isolation Pilot Plant (WIPP) site in east-central Eddy County, New Mexico. The holes were drilled during July, August, and September 1979 to obtain geologic and hydrologic data to better define the regional ground-water-flow system. The geologic data presented in this report are part of a site-characterization study for the possible storage of defense-associated radioactive wastes within salt beds of the Salado Formation of Permian age. The geologic data include detailed descriptions of cores, cuttings, and geophysical logs. Each borehole was designed to penetrate a distinct water-bearing zone: H-9a (total depth 559 feet) was completed just below the Magenta Dolomite Member of the Rustler Formation; H-9b (total depth 708 feet) was completed just below the Culebra Dolomite Member of the Rustler Formation; H-9c (total depth 816 feet) was completed below the Rustler Formation-Salado Formation contact. The geologic units penetrated in borehole H-9c are eolian sand of Holocene age (0-5 feet); the Gatuna Formation of Pleistocene age; (5-25 feet); and the Dewey Lake Red Beds (25-455 feet), the Rustler Formation (455.791 feet), and part of the Salado Formation (791-816 feet), all of Permian age. Three sections (494-501 feet, 615-625 feet, 692-712 feet) in the Rustler Formation penetrated by borehole H-9c are composed of remnant anhydrite (locally altered to gypsum) and clay and silt residue from the dissolution of much thicker seams of argillaceous and silty halite. This indicates that the eastward-moving dissolution within the Rustler Formation, found just to the west of the WIPP site, is present at the H-9 site. (USGS)

  10. Geologic and well-construction data for the H-10 borehole complex near the proposed Waste Isolation Pilot Plant site, southeastern New Mexico

    Science.gov (United States)

    Wells, J.G.; Drellack, S.L.

    1983-01-01

    The H-10 borehole complex, a group of three closely spaced boreholes, is located 3 1/2 miles southeast of the proposed Waste Isolation Pilot Plant site in west-central Lea County, New Mexico. The geological data presented in this report are part of a site-characterization study for the possible storage of defense-associated radioactive wastes within salt beds of the Salado Formation of Permian age. Each borehole was designated to penetrate a distinct water-bearing zone: H-10a (total depth 1 ,318 feet) was completed just below the Magenta Dolomite Member of the Rustler Formation of Permian age; H-10b (total depth 1 ,398 feet) was completed just below the Culebra Dolomite Member of the Rustler Formation; and H-10c (total depth 1,538 feet) was completed below the Rustler Formation-Salado Formation contact. The geologic units penetrated in borehole H-10c are surficial alluvium and eolian sand of Holocene age (0-5 feet); the Mescalero caliche (5-9 feet) and the Gatuna Formation (9-90 feet) of Pleistocene age; formation in the Dockum Group (Chinle Formation, 90-482 feet and Santa Rosa Sandstone, 482-658 feet) of Late Triassic age; and the Dewey Lake Red Beds (658-1,204 feet), the Rustler Formation (1,204-1,501 feet), and part of the Salado Formation (1,501-1,538 feet), all of Permian age. The sections of the Rustler and Salado Formations penetrated by borehole H-10c are complete and contain little or no evidence of dissolution of halite and associated rocks, indicating that the eastward-moving dissolution on top of the Salado, found just to the west of the WIPP site, has not reached the H-10 site. (USGS)

  11. Storageless and caching Tier-2 models in the UK context

    Science.gov (United States)

    Cadellin Skipsey, Samuel; Dewhurst, Alastair; Crooks, David; MacMahon, Ewan; Roy, Gareth; Smith, Oliver; Mohammed, Kashif; Brew, Chris; Britton, David

    2017-10-01

    Operational and other pressures have lead to WLCG experiments moving increasingly to a stratified model for Tier-2 resources, where “fat” Tier-2s (“T2Ds”) and “thin” Tier-2s (“T2Cs”) provide different levels of service. In the UK, this distinction is also encouraged by the terms of the current GridPP5 funding model. In anticipation of this, testing has been performed on the implications, and potential implementation, of such a distinction in our resources. In particular, this presentation presents the results of testing of storage T2Cs, where the “thin” nature is expressed by the site having either no local data storage, or only a thin caching layer; data is streamed or copied from a “nearby” T2D when needed by jobs. In OSG, this model has been adopted successfully for CMS AAA sites; but the network topology and capacity in the USA is significantly different to that in the UK (and much of Europe). We present the result of several operational tests: the in-production University College London (UCL) site, which runs ATLAS workloads using storage at the Queen Mary University of London (QMUL) site; the Oxford site, which has had scaling tests performed against T2Ds in various locations in the UK (to test network effects); and the Durham site, which has been testing the specific ATLAS caching solution of “Rucio Cache” integration with ARC’s caching layer.

  12. Nuclear merchant ship propulsion. The present status in the UK

    International Nuclear Information System (INIS)

    Kinsey, R.P.

    1976-01-01

    The latest report of the Nuclear Ship Stearing Group which deals with three important aspects; economic assessments, international safety and operating procedures for nuclear ships, and the industrial capability of the UK shipbuilding and nuclear industries, is discussed. The integral design concept for a pressurised water reactor for use as a marine reactor is considered. The operational safety aspects of such reactors and of the attendant refuelling facilities are discussed. U.K. capability in the whole nuclear merchant ship propulsion project is considered; reference being made to the design and construction of small PWR reactors, the development, design and supply of the nuclear propulsion unit, financial aspects, and the requirement for cooperation between industrial interests and governmental research units. (U.K.)

  13. Law no. 10.308 of 20th November, 2001 on radioactive waste repositories siting, construction, licensing, operation, inspection, costs, indemnity, civil liability and guarantees concerning to the radioactive wastes repositories and other provisions

    International Nuclear Information System (INIS)

    2001-01-01

    This Act was published on November 20, 2001 and set forth regulations on the final disposal of radioactive wastes produced in Brazil, including siting, construction, licensing, operation, inspection, costs, indemnities, civil liability and guarantees concerning to the radioactive wastes repositories. This act allows for installation and operation of initial, intermediary and final repositories in accordance with the criteria established by the Brazilian Nuclear Energy National Commission - CNEN. The person or organization granted with CNEN authorization for operation of the initial repositories shall be liable for personal, patrimony and environmental radiological damages. The civil liability of CNEN is concerned to the radioactive waste intermediary and final disposals and transportation

  14. ONR Licensing and Regulation of a Geological Disposal Facility in the UK

    International Nuclear Information System (INIS)

    Boydon, Frans; Glazbrook, David

    2014-01-01

    Document available in abstract form only. Full text follows: The UK has substantial quantities of waste which has arisen from operation and decommissioning of legacy nuclear plant. While a disposal route for Low Level Waste (LLW) has been in operation in the UK for many years, there is as yet no such route for Higher Activity Waste. The government invited local communities to express an interest in hosting a Geological Disposal Facility (GDF). However, the Scottish government is opposed to deep disposal and proposes long-term interim storage in Scotland. This paper describes the work underway and current progress in developing a GDF for the UK. In particular it describes the current legal system in the UK that enables nuclear facilities to be licensed and the background underpinning licensing of existing disposal facilities. It identifies changes which will be necessary to legislation to enable a GDF to be licensed and work which it is performing in close co-operation with the Environment Agency which operate a permitting regime for environmental aspects. The Office of Nuclear Regulation (ONR) regulates safety, security and transport associated with nuclear sites. This paper focuses on the regulation of safety and radioactive waste. The UK licensing regime is non-prescriptive and proportionate, allowing for a flexible approach to licensing. The licence is not time-limited but is designed to be used from construction, through commissioning for the lifetime of the facility. Under the Nuclear Installations Act 1965 (as amended) ONR may attach licence conditions: - In the interests of safety; or - with respect to the handling, treatment and disposal of nuclear matter. ONR has developed a suite of 36 Licence conditions, which typically require the operator to made 'adequate arrangements' to ensure safety. These arrangements would involve the use of 'hold points' beyond which the operator must not proceed without ONR's agreement. In determining

  15. Constructed Wetlands

    Science.gov (United States)

    these systems can improve water quality, engineers and scientists construct systems that replicate the functions of natural wetlands. Constructed wetlands are treatment systems that use natural processes

  16. Dark London: Dimensions and characteristics of dark tourism supply in the UK capital

    OpenAIRE

    Powell, Raymond; Iankova, Katia

    2016-01-01

    This paper will investigate the characteristics of the supply of dark tourism in London, UK through an examination of the identified main dark sites in London, UK. Our methodology is based on web analysis of the presence of marketed and non-marketed dark tourist sites in London, their web visitation, the level of their commercialisation and the characteristics which place them in the various scales as categorised in current literature, notably Stone (2006). We identified that London offers a ...

  17. Disbursement of $65 million to the State of Texas for construction of a Regional Medical Technology Center at the former Superconducting Super Collider Site, Waxahachie, Texas

    International Nuclear Information System (INIS)

    1995-05-01

    As part of a settlement agreement between the US DOE and the State of Texas, DOE proposes to transfer $65 million of federal funds to the Texas National Research Laboratory Commission (TNLRC) for construction of the Regional Medical Technology Center (RMTC) to be located in Ellis County, Texas. The RMTC would be a state-of-the-art medical facility for proton cancer therapy, operated by the State of Texas in conjunction with the University of Texas Southwestern Medical Center. The RMTC would use the linear accelerator assets of the recently terminated DOE Superconducting Super Collider Project to accelerate protons to high energies for the treatment of cancer patients. The current design provides for treatment areas, examination rooms, support laboratories, diagnostic imaging equipment, and office space as well as the accelerators (linac and synchrotron) and beam steering and shaping components. The potential environmental consequences of the proposed action are expected to be minor

  18. Nuclear power and the UK

    International Nuclear Information System (INIS)

    Murphy, St.

    2009-01-01

    This series of slides describes the policy of the UK government concerning nuclear power. In January 2008 the UK Government published the White Paper on the Future of Nuclear Power. The White Paper concluded that new nuclear power stations should have a role to play in this country's future energy mix. The role of the Government is neither to build nuclear power plants nor to finance them. The White Paper set out the facilitative actions the Government planned to take to reduce regulatory and planning risks associated with investing in new nuclear power stations. The White Paper followed a lengthy period of consultation where the UK Government sought a wide variety of views from stakeholders and the public across the country on the future of nuclear power. In total energy companies will need to invest in around 30-35 GW of new electricity generating capacity over the next two decades. This is equivalent to about one-third of our existing capacity. The first plants are expected to enter into service by 2018 or sooner. The Office for Nuclear Development (OND) has been created to facilitate new nuclear investment in the UK while the Nuclear Development Forum (NDF) has been established to lock in momentum to secure the long-term future of nuclear power generation in the UK. (A.C.)

  19. Love and desire amongst middle-class Gujarati Indians in the UK and India.

    Science.gov (United States)

    Twamley, Katherine

    2013-01-01

    The paper describes findings from an ethnographic study exploring understandings of love and intimacy amongst young heterosexual middle-class Indians of Gujarati origin in the UK and India. A two-site comparative study was used to enable an understanding of how social and economic contexts shape cultural constructions of intimate relationships and sexuality. Focusing on attitudes to 'love at first sight', this paper shows that, for Indian participants, love based on physical attraction denotes a lesser kind of love. A relationship based on 'physical love' is not expected to last, since it has been formed without regard to family and status concerns. Even couples who meet outside of the arranged marriage system demonstrate the quality of their love by not having sex with one another before marriage. In the UK, however, participants view love as properly spontaneous. Love at first sight is considered desirable and demonstrates how the relationship must be based on love only, without any concern for (for example) material gain. This spontaneous love entails both physical attraction and emotional connection - an early transition to sex, usually before marriage, was seen as both desirable and inevitable.

  20. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    Science.gov (United States)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.