WorldWideScience

Sample records for twelve unconstructed hydroelectric

  1. Development and preliminary validation of the Constructive and Unconstructive Worry Questionnaire: A measure of individual differences in constructive versus unconstructive worry.

    Science.gov (United States)

    McNeill, Ilona M; Dunlop, Patrick D

    2016-11-01

    This article presents a measure of individual differences in the tendencies to worry constructively and unconstructively, called the Constructive and Unconstructive Worry Questionnaire (CUWQ). The measure is based on a control theory perspective of worry and separates the tendency to worry in a way that facilitates goal-pursuit and threat reduction (constructive worry) from the tendency to worry in a way that hinders goal-pursuit while sustaining threat awareness (unconstructive worry). CUWQ scores were validated in 2 independent nonclinical samples, including North American (Sample 1, N = 295) and Australian (Sample 2, N = 998) residents. Final factor items were selected based on Sample 1, and the measure showed good model fit through a confirmatory factor analysis in Sample 2. In addition, scores on the 2 worry factors showed criterion-related validity by statistically predicting a variety of outcomes in both samples: Constructive worry was positively associated with punctuality and wildfire preparedness and negatively associated with trait-anxiety and amount of worry. Unconstructive worry, on the other hand, was positively associated with trait-anxiety and amount of worry, and negatively associated with punctuality and wildfire preparedness. The 2 factor scores were uncorrelated in Sample 1 and positively correlated in Sample 2, thereby showing that having a tendency to worry in an unconstructive manner does not prohibit 1 from worrying in a constructive manner as well. Understanding how the 2 tendencies to worry differ from each other and separating their measurement enables a better understanding of the role of worry in both normal behavior and psychopathology. (PsycINFO Database Record

  2. Small hydroelectric engineering practice

    CERN Document Server

    Leyland, Bryan

    2014-01-01

    Small Hydroelectric Engineering Practice is a comprehensive reference book covering all aspects of identifying, building, and operating hydroelectric schemes between 500 kW and 50 MW. In this range of outputs there are many options for all aspects of the scheme and it is very important that the best options are chosen.As small hydroelectric schemes are usually built against a limited budget it is extremely important that the concept design is optimum and every component is designed to maximise the benefi t and minimise the cost. As operating costs are often a high proportion of the income it i

  3. The role of semantics, pre-emption and skew in linguistic distributions: the case of the un-construction.

    Directory of Open Access Journals (Sweden)

    Paul eIbbotson

    2013-12-01

    Full Text Available We use the Google Ngram database, a corpus of 5,195,769 digitized books containing ~4% of all books ever published, to test three ideas that are hypothesized to account for linguistic generalizations: verbal semantics, pre-emption and skew. Using 828,813 tokens of un-forms as a test case for these mechanisms, we found verbal semantics was a good predictor of the frequency of un-forms in the English language over the past 200 years – both in terms of how the frequency changed over time and their rank frequency. We did not find strong evidence for the direct competition of un-forms and their top pre-emptors, however the skew of the un-construction competitors was inversely correlated with the acceptability of the un-form. We suggest a cognitive explanation for this, namely, that the more the set of relevant pre-emptors is skewed then the more easily it is retrieved from memory. This suggests that it is not just the frequency of pre-emptive forms that must be taken into account when trying to explain usage patterns but their skew as well.

  4. Underground pumped hydroelectric storage

    Science.gov (United States)

    Allen, R. D.; Doherty, T. J.; Kannberg, L. D.

    1984-07-01

    Underground pumped hydroelectric energy storage was conceived as a modification of surface pumped storage to eliminate dependence upon fortuitous topography, provide higher hydraulic heads, and reduce environmental concerns. A UPHS plant offers substantial savings in investment cost over coal-fired cycling plants and savings in system production costs over gas turbines. Potential location near load centers lowers transmission costs and line losses. Environmental impact is less than that for a coal-fired cycling plant. The inherent benefits include those of all pumped storage (i.e., rapid load response, emergency capacity, improvement in efficiency as pumps improve, and capacity for voltage regulation). A UPHS plant would be powered by either a coal-fired or nuclear baseload plant. The economic capacity of a UPHS plant would be in the range of 1000 to 3000 MW. This storage level is compatible with the load-velocity requirements of a greater metropolitan area with population of 1 million or more.

  5. Normanskill Hydroelectric Facility Feasibility Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Besha, J.A.

    1979-01-01

    A study was conducted to determine the feasibility of installing a hydroelectric generating facility at an existing dam of the Normanskill Reservoir in NY. Evaluation of the hydrologic, technical, economic, legal, instrumental and environmental factors led to the conclusion that the project is feasible and advantageous. The proposed project has a present worth net cost of $3,099,800. The benefit cost ratio is 2.36. It is estimated that the proposed hydroelectric generating facility at the French's Mills site, City of Watervliet Reservoir will replace approximately 6,000 barrels of foreign oil per year. (LCL)

  6. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Science.gov (United States)

    2011-10-05

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sutton Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and...

  7. Automation of hydroelectric power plants

    Energy Technology Data Exchange (ETDEWEB)

    Grasser, H.S. (Consolidated Papers, Inc., Wisconsin Rapids, WI (US))

    1990-03-01

    This paper describes how the author's company has been automating its hydroelectric generating plants. The early automations were achieved with a relay-type supervisory control system, relay logic, dc tachometer, and a pneumatic gate-position controller. While this system allowed the units to be started and stopped from a remote location, they were operated at an output that was preset by the pneumatic control at the generating site. The supervisory control system at the site provided such information as unit status, generator breaker status, and a binary coded decimal (BCD) value of the pond level. The generating units are started by energizing an on-site relay that sets the pneumatic gate controller to a preset value above the synchronous speed of the hydroelectric generator. The pneumatic controller then opens the water-wheel wicket gates to the preset startup position. As the hydroelectric generator starts to turn, the machine-mounted dc tachometer produces a voltage. At a dc voltage equivalent to synchronous speed, the generator main breaker closes, and a contact from the main breaker starts a field-delay timer. Within a few seconds, the field breaker closes. Once the cycle is complete, a relay changes the pneumatic setpoint to a preset operating point of about 8/10 wicket gate opening.

  8. Regional policy and hydroelectric resources

    Directory of Open Access Journals (Sweden)

    Franco Romerio

    2009-06-01

    Full Text Available This article brings to light the different models applied in the management of hydroelectric resources in the Swiss canton Ticino during the 20th century. Future prospects are broached in view of the opening of the electricity markets to competition. We equally analyse political projects, notably regarding matters of water cantonalisation, as well as the technico-economic factors which influence them. Conflicts, that have been particularly acute, are evoked, and socio-economic, energy and environmental issues detailed. The national and international context is pointed out. The study allows the identification of critical factors that must be considered in the definition of regional policies in relation to hydroelectric matters.Cet article met en lumière les différents modèles de gestion des ressources hydroélectriques adoptés dans le canton du Tessin au XXe siècle. Les perspectives d’avenir sont esquissées en vue des processus d’ouverture des marchés à la concurrence. On analyse aussi bien les projets politiques, notamment en matière de cantonalisation des eaux, que les problèmes technico-économiques qui les ont influencés. Les conflits, qui ont été particulièrement aigus, sont évoqués, et les enjeux socio-économiques, énergétiques et environnementaux précisés. Le contexte national et international est rappelé tout au long de l’analyse. Cette étude permet d’identifier les facteurs critiques qu’il faut prendre en considération dans la définition des politiques régionales en matière hydroélectrique.

  9. The Twelve Hotel, Barna : Video

    OpenAIRE

    Irish Food Channel

    2014-01-01

    Fergus O'Halloran, Managing Director of The Twelve Hotel in Barna in County Galway, talks about his philosophy in running this unique boutique hotel. Reproduced with kind permission from John & Sally McKenna. 3.35 mins

  10. Optimal control of hydroelectric facilities

    Science.gov (United States)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  11. Hydroelectricity production and forest conservation in watersheds.

    Science.gov (United States)

    Guo, Zhongwei; Li, Yiming; Xiao, Xiangming; Zhang, Lin; Gan, Yaling

    2007-09-01

    Globally, particularly in developing countries, hydroelectricity production and economic growth occur together with ecosystem/biodiversity conservation in watersheds. There is a relationship between hydroelectricity production and ecosystem/biodiversity conservation in watersheds, centering on the supply and demand for ecosystem services of river water flow regulation and sediment retention. Here we show that, in the upper reach of the Yangtze River, hydroelectricity production of Three Gorges Hydroelectric Power Plant can form a beneficial relationship with forest conservation through the paid use (compensating residents for their cooperation in the conservation) of ecosystem services launched by the National Natural Forest Protection Project. This interaction can provide additional incentives to encourage local communities' long-term cooperation in conserving and protecting the restored forest ecosystems. Hydroelectricity plants also obtain benefits from this interaction. The industrialization of ecosystem services supply provides an operational framework for this beneficial interaction. Sustainable forest ecosystem conservation will require developing new institutions and policies and must involve local communities in the conservation and protection of their local forests.

  12. Hiilangaay Hydroelectric Project – Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Twitchell, Sara [HDR, Omaha, NE (United States); Stimac, Michael [HDR, Omaha, NE (United States); Lang, Lisa [Haida Corporation, Hydaburg, AK (United States); Witwer, Doreen [Haida Corporation, Hydaburg, AK (United States); Jameson, Vincent [Haida Corporation, Hydaburg, AK (United States)

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

  13. Daily storage management of hydroelectric facilities

    NARCIS (Netherlands)

    Chappin, E.J.L.; Ferrero, M.; Lazzeroni, P.; Lukszo, Z.; Olivero, M.; Repetto, M.

    2012-01-01

    This work presents a management procedure for hydroelectric facilities with daily storage. The water storage gives an additional degree of freedom allowing to shift in time power production when it is more convenient and to work at the maximum efficiency of hydraulic turbine. The management is optim

  14. Hydroelectricity - An Answer To Energy Needs

    Energy Technology Data Exchange (ETDEWEB)

    Francois-Xausa, Maryse; Havard, David; Czerwinski, Francois; Teller, Olivier

    2010-09-15

    The energy challenges of the next 30 years appear daunting and, in certain cases, in conflict with one another. Their complexity is such that one solution alone cannot provide a full answer. It is nevertheless equally clear that hydro-electricity, being renewable, proven, highly efficient, storable and with still very significant resource potential, possesses a unique combination of attributes which will aid decision-makers to plan and execute energy development with confidence.

  15. Upgrading hydro-electric generating facilities

    Energy Technology Data Exchange (ETDEWEB)

    Coulson, D.M.; Villalon, M.

    1987-11-01

    Approximately 1,720,000 kW of installed hydro-electric generating capacity is either owned directly by pulp and paper companies in Canada or is operated principally in their service. The 216 units involved were commissioned between 1902 and 1982. This paper suggests an approach to upgrading the generating units themselves as well as the related electrical and mechanical equipment and civil structures, giving approximate durations and costs. A complete system study is recommended. 2 refs., 2 figs., 3 tabs.

  16. A guide to India's hydroelectric organisations

    Energy Technology Data Exchange (ETDEWEB)

    Sahai, I.M.

    1999-12-01

    A brief history of hydroelectric power in India is given. The ownership, role and future of India's National Hydroelectric Power Corporation (NHPC) is described. Tables of Hydro Power Potential in India and Installed Hydroelectric Capacity in India are given. Some major hydroelectric projects undertaken by federal-state joint ventures are described. Bearing in mind the enormous potential for further development of hydro, the federal-owned National Thermal Power Corporation (NTPC) has now moved into hydro, but to date it has had little impact. Overseas companies have also had little impact on hydro in India. Renovation of older hydro plant is likely to provide work opportunities for private companies.

  17. Small-Scale Hydroelectric Power Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  18. Methods for generating hydroelectric power development alternatives

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Shoou-yuh; Liaw, Shu-liang; Sale, M.J.; Railsback, S.F.

    1989-01-01

    Hydropower development on large rivers can result in a number of environmental impacts, including potential reductions in dissolved oxygen (DO) concentrations. This study presents a methodology for generating different hydropower development alternatives for evaluation. This methodology employs a Streeter-Phelps model to simulate DO, and the Bounded Implicit Enumeration algorithm to solve an optimization model formulated to maximize hydroelectric energy production subject to acceptable DO limits. The upper Ohio River basin was used to illustrate the use and characteristics of the methodology. The results indicate that several alternatives which meet the specified DO constraints can be generated efficiently, meeting both power and environmental objectives. 17 refs., 2 figs., 1 tab.

  19. Transanal rectopexy - twelve case studies

    Directory of Open Access Journals (Sweden)

    Rubens Henrique Oleques Fernandes

    2012-06-01

    Full Text Available OBJECTIVES: This study analyzed the results of transanal rectopexy and showed the benefits of this surgical technique. METHOD: Twelve patients were submitted to rectopexy between 1997 and 2011. The surgical technique used was transanal rectopexy, where the mesorectum was fixed to the sacrum with nonabsorbable suture. Three patients had been submitted to previous surgery, two by the Delorme technique and one by the Thiersch technique. RESULTS: Postoperative hospital stay ranged from 1 to 4 days. One patient (8.3% had intraoperative hematoma, which was treated with local compression and antibiotics. One patient (8.3% had residual mucosal prolapse, which was resected. Prolapse recurrence was seen in one case (8.3%. Improved incontinence occurred in 75% of patients and one patient reported obstructed evacuation in the first month after surgery. No death occurred. CONCLUSION: Transanal rectopexy is a simple, low cost technique, which has shown good efficacy in rectal prolapse control.OBJETIVO: O presente estudo analisou os resultados da retopexia pela via transanal e expôs os benefícios desta técnica cirúrgica. MÉTODO: Doze pacientes com prolapso foram operados no período de 1997 a 2011. A técnica cirúrgica usada foi a retopexia transanal, onde o mesorreto foi fixado ao sacro com fio inabsorvível. Três pacientes tinham cirurgia prévia, dois pela técnica de Delorme e um pela técnica de Thiersch. RESULTADOS: A permanência hospitalar pós-operatória variou de 1- 4 dias. Uma paciente (8,3% apresentou hematoma transoperatório que foi tratado com compressão local e antibioticoterapia. Um paciente apresentou prolapso mucoso residual (8,3%, que foi ressecado. Houve recidiva da procidência em um caso (8,3%. A melhora da incontinência ocorreu em 75% dos pacientes e uma paciente apresentou bloqueio evacuatório no primeiro mês após a cirurgia. Não houve mortalidade entre os pacientes operados. CONCLUSÃO: A retopexia transanal é uma t

  20. FORESIGHT - ECOSUSTAINABLE DETERMINANTS OF STRATEGIC MODERNIZATION OF HYDROELECTRIC POWER PLANTS

    Directory of Open Access Journals (Sweden)

    L. Dovgan

    2015-08-01

    Full Text Available In the paper the foresight methodology as an ecosustainable determinants of strategic modernization of hydroelectric power plants in the conditions of the external challenges and threats is revealed. The strategic concepts of modernization and a mechanism of strategic modernization of hydroelectric power plants on the principles of public-private partnerships is allocated. Recommendations on the implementation of the results of the strategic foresight to the modernization of hydroelectric power plants in the interaction of public and private agents are formulated.

  1. Canton hydroelectric project: feasibility study. Final report, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

  2. Hydroelectric project impacts on Stikine River ecosystems: An overview

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The report provides an overview on the hydroelectric project impacts on Stikine river ecosystems. The objective of this study was to develop a report which would aid...

  3. Lawrence hydroelectric project: resurrection of a low-head dam

    Energy Technology Data Exchange (ETDEWEB)

    1982-04-01

    The Lawrence Hydroelectric Project, located on the Merrimac River in Lawrence, Mass, is one of the first hydro projects completed since the oil crisis and has set an important precedent for the development of other low-head generation systems in New England. The hydroelectric project is built alongside the old 920-ft-long granite dam. The plant uses two bulb-type Kaplan turbine/generator units, each rated at 8.4 MW.

  4. Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia

    Science.gov (United States)

    Turan, Faiz Mohd; Johan, Kartina

    2017-08-01

    Sustainably developed and managed hydropower has enormous potential to contribute to global sustainability goals. It is known that hydroelectricity contributing small amounts to greenhouse gas emissions and other atmospheric pollutants. However, developing the remaining hydroelectric potential offers many challenges, and public pressure and expectations on the environmental and social performance of hydroelectric tend to increase over time. This paper aims to develop Systematic Sustainability Assessment (SSA) Tool that promotes and guides more sustainable hydroelectric projects in the context of Malaysia. The proposed SSA tool which not only provide a quality and quantitative report of sustainability performance but also act as Self-Assessment Report (SAR) to provide roadmap to achieve greater level of sustainability in project management for continuous improvement. It is expected to provide a common language that allow government, civil society, financial institutions and the hydroelectric sector to talk about and evaluate sustainability issues. The advantage of SSA tool is it can be used at any stage of hydroelectric development, from the earliest planning stages right through to operation.

  5. Jackson Bluff Hydroelectric Project. Feasibility assessment report

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-01

    A feasibility assessment study was conducted to determine if it is economical to reinstall hydroelectric generating units at the existing Jackson Bluff Dam on the Ochlockonee River in Florida. The studies and investigations have included site reconnaissance, system loads, growth rate, site hydrology, conceptual project arrangements and layouts, power output, estimates of construction costs and annual costs, economic analyses, development of a design and construction schedule and a preliminary environmental review of the proposed Project. It was concluded that the Project poses no unusual technical problems and no significant adverse environmental effects are anticipated. It shows sufficient promise of technical, economic and financial feasibility, to justify the City entering into the next phase of work, the FERC License Application, as soon as possible. The site can be restored for an investment of $9.9 to $10.4 million to establish 8.8 MW of capacity and produce 24,920 MWh of electrical energy annually, and in 10 years would save over $4 million as compared with current fuel costs for operating an oil-fueled power plant. (LCL)

  6. Hoopa Valley Small Scale Hydroelectric Feasibility Project

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Miller

    2009-03-22

    This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

  7. Mythematics Solving the Twelve Labors of Hercules

    CERN Document Server

    Huber, Michael

    2009-01-01

    How might Hercules, the most famous of the Greek heroes, have used mathematics to complete his astonishing Twelve Labors? From conquering the Nemean Lion and cleaning out the Augean Stables, to capturing the Erymanthean Boar and entering the Underworld to defeat the three-headed dog Cerberus, Hercules and his legend are the inspiration for this book of fun and original math puzzles. While Hercules relied on superhuman strength to accomplish the Twelve Labors, Mythematics shows how math could have helped during his quest. How does Hercules defeat the Lernean Hydra and stop its heads from multip

  8. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... Ferry Hydroelectric Project; Notice of Proposed Restricted Service List for a Programmatic Agreement... inclusion in, the National Register of Historic Places at the existing Bartletts Ferry Hydroelectric Project...

  9. [Hygienic characteristics of work conditions at large Hydroelectric Power Plants with mechanization and automatization].

    Science.gov (United States)

    Iakimova, L D

    1997-01-01

    The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.

  10. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-05-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy...), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal...

  11. 76 FR 22393 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation...

    Science.gov (United States)

    2011-04-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... and Wildlife Service for the proposed Eagle Mountain Pumped Storage Hydroelectric Project....

  12. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Science.gov (United States)

    2012-08-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  13. 76 FR 81929 - South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project

    Science.gov (United States)

    2011-12-29

    ... Cooper Hydroelectric Project On May 26 and November 8, 2011, Commission staff met with representatives of...), licensee for the Santee-Cooper Hydroelectric Project No. 199, to discuss what is needed to complete...

  14. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Energy Regulatory Commission Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In... reviewed the application for license for the Martin Dam Hydroelectric Project (FERC No. 349), located...

  15. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Energy Regulatory Commission Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of... that could be affected by issuance of a new license for the Bartletts Ferry Hydroelectric Project No... list for the Bartletts Ferry Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town...

  16. Comparative analysis of twelve Dothideomycete plant pathogens

    Energy Technology Data Exchange (ETDEWEB)

    Ohm, Robin; Aerts, Andrea; Salamov, Asaf; Goodwin, Stephen B.; Grigoriev, Igor

    2011-03-11

    The Dothideomycetes are one of the largest and most diverse groups of fungi. Many are plant pathogens and pose a serious threat to agricultural crops grown for biofuel, food or feed. Most Dothideomycetes have only a single host and related Dothideomycete species can have very diverse host plants. Twelve Dothideomycete genomes have currently been sequenced by the Joint Genome Institute and other sequencing centers. They can be accessed via Mycocosm which has tools for comparative analysis

  17. Joint Venture Modes of Water Conservancy and Hydroelectric Engineering

    OpenAIRE

    Zhiding Chen; Zhudi Sheng

    2013-01-01

    With the long construction period, the giant scope and complex technology, water conservancy and hydroelectric engineering construction has large investment. In the fully competitive water conservancy and hydropower project construction contracting market, it is almost impossible for a company to contract with a water conservancy and hydropower project independently. Therefore, water conservancy and hydropower project construction can be contracted by several construction companie...

  18. Hydroelectric power potential, Woonsocket Falls Dam, Woonsocket, Rhode Island

    Energy Technology Data Exchange (ETDEWEB)

    Daly, J C; Dowdell, R B; Kelly, W E; Koveos, P E; Krikorian, Jr, J S; Lengyel, G; Prince, M J; Seely, S; Tromp, L; Urish, D W

    1979-01-01

    The feasibility of developing a hydroelectric power plant at an existing flood control dam of the city of Woonsocket, RI was examined considering environmental, economic, technical and engineering factors. It was concluded that the City should proceed with plans to develop a hydro plant. (LCL)

  19. Current Status and Future Prospects of Hydroelectricity Standardization

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    Technical standardization is very essential to electricity industry, which plays an active role in many aspects including technology standardization, secure and economic operation of power systems, environment protection, technological progress, and improvement of enterprises' management. This paper introduces the current status of hydroelectricity standardization, summarizes the progress and achievements, and then points out the development direction and working target in the future.

  20. Current Status and Future Prospects of Hydroelectricity Standardization

    Institute of Scientific and Technical Information of China (English)

    Liu Yongdong

    2010-01-01

    @@ Technical standardization is very essential to electricity industry, which plays an active role in many aspects including technology standardization, secure and economic operation of power systems, environment protection, technological progress, and improvement of enterprises' management. This paper introduces the current status of hydroelectricity standardization, summarizes the progress and achievements, and then points out the development direction and working target in the future.

  1. Twelve tips for peer observation of teaching.

    Science.gov (United States)

    Siddiqui, Zarrin Seema; Jonas-Dwyer, Diana; Carr, Sandra E

    2007-05-01

    This paper outlines twelve tips for undertaking peer observation of teaching in medical education, using the peer review model and the experiences of the authors. An accurate understanding of teaching effectiveness is required by individuals, medical schools, and universities to evaluate the learning environment and to substantiate academic and institutional performance. Peer Observation of Teaching is one tool that provides rich, qualitative evidence for teachers, quite different from closed-ended student evaluations. When Peer Observation of Teaching is incorporated into university practice and culture, and is conducted in a mutually respectful and supportive way, it has the potential to facilitate reflective change and growth for teachers.

  2. Hydroelectric power drives a sports car; Wasserkraft treibt Sportwagen an

    Energy Technology Data Exchange (ETDEWEB)

    Grabotin, Norbert

    2009-07-01

    The first electrically powered sports car from Germany, the so-called eRUF Concept Model A 2008 has been proposed previously. The basic idea for this concept was initiated by Alois Ruf (Pfaffhausen, Federal Republic of Germany) in the form of a new vision of a simple energy transfer concept: His hydroelectric power plants feed 35 million kWh of electrical energy annually into the German energy network. These hydroelectric power plans also could drive modern cars more or less directly. The annually produced amount of electrical energy (35 million kWh) nearly is in accordance with that amount of electrical energy which enables a single car (eRUF, model A 2008) to drive 3,500 times around the globe. The author of this paper describes the prototype of this car.

  3. Small hydroelectric power system for the Penasco Valley

    Energy Technology Data Exchange (ETDEWEB)

    Edgel, W.R.

    1982-05-01

    Development of hydroelectric power with attendant improvements to the existing irrigation system is proposed for the Penasco Valley in southeastern New Mexico. The area is presently plagued by spring floods and summer drought, and by high energy costs, both of which limit the agricultural activity in the area to a fraction of what it could be given adequate water and power. The proposed solution is to use pipelines to carry water past sinks in the river channel through several small hydroelectric plants to the point of release for irrigation. This report describes the results of the reconnaissance study. Additional funding will be sought from EMD and other agencies for continuation of the project. Successful completion of the project will (1) harness an inconsistent river to provide power and a permanent water supply, (2) displace remotely generated power and reduce line losses, (3) increase agricultural production in the area, and (4) possibly precipitate industrial development.

  4. Digital Modeling and Visualization of Hydroelectric Engineering Geoinformation

    Institute of Scientific and Technical Information of China (English)

    LIU Donghai; ZHONG Denghua; LI Mingchao

    2006-01-01

    To describe the spatial tendency and complex relationship of geological structures, a digital modeling based on geographic information system and the visualization of hydroelectric engineering geology information are presented. The functions of information visual query, spatial cutting,section drawing, and coupled analysis with hydraulic structures are realized. The geologic model can match the attribute data with the shape data of geological structures, and organize the information for spatial query and analysis of the 3D model. With an application in Laxiwa hydroelectric project on the upriver of Huanghe River, the method provides a 3D parallel section view and query results of geoinformation, and 3D section views of geoinformation along axis of spillway tunnel, and along the 5th axis with underground structures, respectively.

  5. The Pergau hydroelectric project. Pt. 2: Civil engineering construction

    Energy Technology Data Exchange (ETDEWEB)

    McEwan, E.; Idiculla, J.; Patel, R. [Balfour Beatty Cementation Joint Venture, Sidcup (United Kingdom)

    1997-09-01

    The Pergau Hydroelectric Project was built as a design and construct contract in Northern Peninsular Malaysia by an Anglo-Malaysian joint venture with funding assistance provided by the British Government. The project is located approximately 100 km west of the Kelantan State capital of Kota Bharu. This paper describes the contractor`s mobilization for the 600 MW hydroelectric project and the general construction requirements for the project. Although each section of the works had its own particular problems of construction, this paper concentrates on the following three areas that were critical in meeting the key dates for completion: the powerhouse and power tunnels; the power shaft; the Kuala Yong dam. It also includes a brief description of the tunnelling methods used. (author)

  6. Combining ability of twelve maize populations

    Directory of Open Access Journals (Sweden)

    Vacaro Elton

    2002-01-01

    Full Text Available Genetic progress depends on germplasm quality and breeding methods. Twelve maize populations and their crosses were evaluated to estimate combining ability and potential to be included as source populations in breeding programs. Plant height, point of insertion of the first ear, number of ears per plant, number of grains per ear, root and stalk lodging and grain yield were studied in two locations in Brazil, during the 1997/98 season. Genotype sum of squares was divided into general (GCA and specific (SCA combining ability. Results indicated the existence of genetic divergence for all traits analyzed, where additive effects were predominant. The high heterosis levels observed, mainly in Xanxerê, suggested the environmental influence on the manifestation of this genetic phenomenon. Populations revealed potential to be used in breeding programs; however, those more intensively submitted to selection could provide larger genetic progress, showing the importance of population improvement for the increment of the heterosis in maize.

  7. Training in Costa Rica[Angostura hydroelectric project

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2001-02-01

    This article reports on the construction of the Angostura hydroelectric project using three newly delivered computerised, self-contained grout mixing stations. The 177MW Angostura project on the Rio Reventazon is described, and the geology of the region, and the training of employees in drilling techniques, mortar and mortar mixing, and grouting are discussed. Details are given of the headrace tunnel, the grouting equipment and operation, and the three drilling and grouting patterns used.

  8. Cross currents : hydroelectricity and the engineering of northern Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Manore, J.L. [Calgary Univ., AB (Canada)

    1999-05-01

    The history of hydroelectric development in northern Ontario was reviewed and analysed with special emphasis on the developments along the Mattagami and Abitibi Rivers. The objective was to examine the important factors that shaped modern hydroelectric development in Canada. System builders, the privately owned Nesbitt Thomson Company, the publicly owned Hydro Electric Power Corporation of Ontario and the eventual evolution of the single power system under Ontario Hydro are chronicled. Broad historical themes such as the technological impacts, regionalism, indigenous rights, plus environmental and economic issues are examined, in addition to an appreciation of the importance of electricity in the manufacturing sector of Ontario, the impact of hydroelectric development on the northern environment and on the northern First Nations, who rely on rivers for their subsistence. Until fairly recently, government policies and interpretations of law often excluded the recognition of Aboriginal uses of river systems, thereby limiting First Nations` peoples ability to practice traditional ways of life. In essence, the book is an account of how the northeastern power system in Ontario shaped the social, political and natural environments and how the development of northeastern power sources by southern power developers shaped the regional interactions between Ontario`s north and south. refs., figs.

  9. An estimation of the capacity to produce hydrogen by wasted hydroelectric energy for the three largest Brazilian hydroelectric

    Energy Technology Data Exchange (ETDEWEB)

    Padilha, Janine C.; Trindade, Leticia G. da; Souza, Roberto F. de [Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Inst. of Chemistry], Email: janine@iq.ufrgs.br; Miguel, Marcelo [Itaipu Binacional, Foz do Iguacu, PR (Brazil)

    2010-07-01

    The use of water wasted in hydroelectric plants as normalization dam excess, which constitute a hydrodynamic potential useful to generate electric energy which can be subsequently used to produce hydrogen and its subsequent consumption in fuel cells has been considered as an alternative for hydraulic energy-rich countries like Brazil. The case is examined in which all the water wasted in the hydroelectric plants, spilled by dam gates to maintain acceptable water levels, from the 3 largest Brazilian hydroelectric plants was used to produce hydrogen. During the year of 2008, the electric energy produced from this utilization would have been equivalent to 52.8 TWh, an amount that corresponds to an increase of ca. 15% of the total electric energy produced in the country. Furthermore, if this amount of hydrogen was used in the replacement of internal combustion vehicles by fuel cells, this would have prevented the production of 2.26 x 10{sup 7} ton of Co{sub 2} per year. This plan would also significantly decrease production and release of greenhouse gases. (author)

  10. Stock participation in hydroelectric projects; Hacia una participacion accionaria en los proyectos hidroelectricos

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, Scott S. [Universidad Metropolitana, Iztapalapa (Mexico). Dept. de Antropologia

    1996-12-31

    This work talks about the way the hydroelectric companies deal with the moving of people for reservoir construction. It happens trough an authoritarian way without a previous communication with the people that will be moved what make them resist. The proposal of author is make people that will be affected by the hydroelectric construction participate in the benefices it will generate. It happened in the construction of hydroelectric project in Pangue, Chile, with good results

  11. Twelve tips for getting your manuscript published.

    Science.gov (United States)

    Cook, David A

    2016-01-01

    The author shares twelve practical tips on how to navigate the process of getting a manuscript published. These tips, which apply to all fields of academic writing, advise that during the initial preparation phase authors should: (1) plan early to get it out the door; (2) address authorship and writing group expectations up front; (3) maintain control of the writing; (4) ensure complete reporting; (5) use electronic reference management software; (6) polish carefully before they submit; (7) select the right journal; and (8) follow journal instructions precisely. Rejection after the first submission is likely, and when this occurs authors should (9) get it back out the door quickly, but first (10) take seriously all reviewer and editor suggestions. Finally, when the invitation comes to revise and resubmit, authors should (11) respond carefully to every reviewer suggestion, even if they disagree, and (12) get input from others as they revise. The author also shares detailed suggestions on the creation of effective tables and figures, and on how to respond to reviewer critiques.

  12. Antifouling activity of twelve demosponges from Brazil

    Directory of Open Access Journals (Sweden)

    SM. Ribeiro

    Full Text Available Benthic marine organisms are constantly exposed to fouling, which is harmful to most host species. Thus, the production of secondary metabolites containing antifouling properties is an important ecological advantage for sessile organisms and may also provide leading compounds for the development of antifouling paints. High antifouling potential of sponges has been demonstrated in the Indian and Pacific oceans and in the Caribbean and Mediterranean seas. Brazilian sponges remain understudied concerning antifouling activities. Only two scientific articles reported this activity in sponges of Brazil. The objective of this study was to test crude extracts of twelve species of sponges from Brazil against the attachment of the mussel Perna perna through laboratorial assays, and highlight promising species for future studies. The species Petromica citrina, Amphimedon viridis, Desmapsamma anchorata, Chondrosia sp., Polymastia janeirensis, Tedania ignis, Aplysina fulva, Mycale angulosa, Hymeniacidon heliophila, Dysidea etheria, Tethya rubra, and Tethya maza were frozen and freeze-dried before extraction with acetone or dichloromethane. The crude extract of four species significantly inhibited the attachment of byssus: Tethya rubra (p = 0.0009, Tethya maza (p = 0.0039, Petromica citrina (p = 0.0277, and Hymeniacidon heliophila (p = 0.00003. These species, specially, should be the target of future studies to detail the substances involved in the ability antifouling well as to define its amplitude of action.

  13. Twelve Elastic Constants of Betula platyphylla Suk.

    Institute of Scientific and Technical Information of China (English)

    Wang Liyu; Lu Zhenyou

    2004-01-01

    Wood elastic constants are needed to describe the elastic behaviors of wood and be taken as an important design parameter for wood-based composite materials and structural materials. This paper clarified the relationships between compliance coefficients and engineering elastic constants combined with orthotropic properties of wood, and twelve elastic constants of Betula platyphylla Suk. were measured by electrical strain gauges. Spreading the adhesive quantity cannot be excessive or too little when the strain flakes were glued. If excessive, the glue layer was too thick which would influence the strain flakes' performance, and if too little, glues plastered were not firm, which could not accurately transmit the strain. Wood as an orthotropic material, its modulus of elasticity and poisson's ratios are related by two formulas:μij /Ei =μji /Ej and μij 0.95) between the reciprocal of elastic modulus MOE-1 and the square of the ratio of depth to length (h/l)2, which indicate that shear modulus values measured were reliable by three point bending experiment.

  14. Study on safety operation for large hydroelectric generator unit

    Science.gov (United States)

    Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.

    2012-11-01

    Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.

  15. An Adaptive Multivariable Control System for Hydroelectric Generating Units

    Directory of Open Access Journals (Sweden)

    Gunne J. Hegglid

    1983-04-01

    Full Text Available This paper describes an adaptive multivariable control system for hydroelectric generating units. The system is based on a detailed mathematical model of the synchronous generator, the water turbine, the exiter system and turbine control servo. The models of the water penstock and the connected power system are static. These assumptions are not considered crucial. The system uses a Kalman filter for optimal estimation of the state variables and the parameters of the electric grid equivalent. The multivariable control law is computed from a Riccatti equation and is made adaptive to the generators running condition by means of a least square technique.

  16. Risk assessment method of major unsafe hydroelectric project

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    Based on the characteristics of major unsafe hydroelectric projects and the data from field detection, in situ monitoring, and regular safety inspection, the funda-mental principles of operation risk assessment are proposed in this paper. Mean-while, a three layer hierarchical system is constructed, and an improved analytical hierarchical process combining genetic algorithm and analytical hierarchical process is established, with corresponding program. The operation risk of some unsafe dam was assessed with the principles, method and program presented in this paper and the major factors which would affect the operation of the dam were pointed out.

  17. Risk assessment method of major unsafe hydroelectric project

    Institute of Scientific and Technical Information of China (English)

    WU ZhongRu; SU HuaiZhi; GUO HaiQing

    2008-01-01

    Based on the characteristics of major unsafe hydroelectric projects and the data from field detection, in situ monitoring, and regular safety inspection, the funda- menial principles of operation risk assessment are proposed in this paper. Mean- while, a three layer hierarchical system is constructed, and an improved analytical hierarchical process combining genetic algorithm and analytical hierarchical process is established, with corresponding program. The operation risk of some unsafe dam was assessed with the principles, method and program presented in this paper and the major factors which would affect the operation of the dam were pointed out.

  18. Hepatic Angiosarcoma: a Review of Twelve Cases

    Institute of Scientific and Technical Information of China (English)

    Qiang Li; Xishan Hao

    2005-01-01

    OBJECTIVE Hepatic angiosarcoma (HAS), a lethal disease, is the most common sarcoma arising in the liver. Little information about the epidemiology, etiology, diagnosis and management of HAS has been reported. Increased familiarity with this disease will facilitate correct diagnosis and help to improve management of this condition in the future.The objective of this study was to describe cases of hepatic angiosarcoma and to discuss the etiologic, diagnostic, therapeutic features and prognosis of this tumor. This report not only serves to give more evidence of the relationship between hepatic angiosarcoma and carcinogenic exposure, but also demonstrates the key points in different methods of diagnosis and the optimal treatment of hepatic angiosarcoma.METHODS Twelve cases of hepatic angiosareoma were analyzed retrospectively, representing the different character in clinical presentations and laboratory computed tomographical scans; pathological data and treatment are described. Clinical and biologic follow-up was carried out for two years after surgical treatment.RESULTS There were nine men and three women varying in ages from 57 to 71 years with an average of 64.3 years. Ten patientshad a history of exposure to vinyl chloride or thorotrast. Mild or moderate abdominal pain and bloating, abdominal mass and fever were the common clinical presentations. Tumors were visualized by ultrasonography and CT scans in all patients. Biochemical profiles yielded variable results and proved to be of little value in detection or diagnosis. Surgical resection was feasible for each patient who was treated as follows: two wedge resections, six segementectomies and four bisegmentectomies. Five patients received Neoadjuvant chemotherapy postoperatively. The survival rate of those cases was poor. The maximum survival time was fourteen months. The mean survival time for this chemotherapeutic group was 11 months. The difference between the survival time of those treated with an operation

  19. 78 FR 38028 - Duke Energy Progress, Inc.; Notice of Video Conference To Discuss Yadkin-Pee Dee Hydroelectric...

    Science.gov (United States)

    2013-06-25

    ... Dee Hydroelectric Project Biological Opinion On April 29, 2013, the National Marine Fisheries Service... relicensing of the Yadkin-Pee Dee River Hydroelectric Project No. P-2206. The document included NMFS'...

  20. Hydro-Electric Facilities, (Municpality Name) Hydro-electric Facility, Published in 2005, 1:24000 (1in=2000ft) scale, Lafayette County Land Records.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Hydro-Electric Facilities dataset, published at 1:24000 (1in=2000ft) scale, was produced all or in part from Field Observation information as of 2005. It is...

  1. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and...

  2. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2012-07-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e....

  3. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Science.gov (United States)

    2012-01-20

    ... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of... 47897), the Office of Energy Projects has reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's Gibson dam on...

  4. 75 FR 30805 - Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions...

    Science.gov (United States)

    2010-06-02

    ... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final... Commission and is available for public inspection. a. Type of Application: Major Project--Existing Dam. b. Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric...

  5. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Science.gov (United States)

    2011-05-09

    ... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft... Energy Projects has reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's, Gibson dam on the Sun River...

  6. 76 FR 20657 - Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement...

    Science.gov (United States)

    2011-04-13

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Wells Hydrolectric Project and Intention To Hold Public Meetings In... Office of Energy Projects has reviewed the application for license for the Wells Hydroelectric...

  7. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells Hydrolectric Project In accordance with the National Environmental... reviewed the application for license for the Wells Hydroelectric Project (FERC No. 2149), located on...

  8. 78 FR 38027 - Wilkesboro Hydroelectric Company, LLC; Wilkesboro Hydropower, LLC; Notice of Application for...

    Science.gov (United States)

    2013-06-25

    ... Energy Regulatory Commission Wilkesboro Hydroelectric Company, LLC; Wilkesboro Hydropower, LLC; Notice of..., Wilkesboro Hydroelectric Company, LLC (transferor) and Wilkesboro Hydropower, LLC (transferee) filed an application for the transfer of license for the W. Kerr Scott Hydropower Project, FERC No. 12642, located on...

  9. 77 FR 23242 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-04-18

    ... the Banks Lake Pumped Storage Project (Banks Lake Project or project) to be located on Banks Lake and... Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit... December 1, 2011, the Grand Coulee Project Hydroelectric Authority filed an application for a preliminary...

  10. Status Review of Wildlife Mitigation at Columbia Basin Hydroelectric Projects, Oregon Facilities, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bedrossian, Karen L.

    1984-08-01

    The report presents a review and documentation of existing information on wildlife resources at Columbia River Basin hydroelectric facilities within Oregon. Effects of hydroelectric development and operation; existing agreements; and past, current and proposed wildlife mitigation, enhancement, and protection activities were considered. (ACR)

  11. Small-Scale Hydroelectric Power Demonstration Project. Pennsylvania Hydroelectric Development Corporation Flat Rock Dam: Project summary report

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  12. Energy harvesting from hydroelectric systems for remote sensors

    Directory of Open Access Journals (Sweden)

    Joaquim Azevedo

    2016-10-01

    Full Text Available Hydroelectric systems are well-known for large scale power generation. However, there are virtually no studies on energy harvesting with these systems to produce tens or hundreds of milliwatts. The goal of this work was to study which design parameters from large-scale systems can be applied to small-scale systems. Two types of hydro turbines were evaluated. The first one was a Pelton turbine which is suitable for high heads and low flow rates. The second one was a propeller turbine used for low heads and high flow rates. Several turbine geometries and nozzle diameters were tested for the Pelton system. For the propeller, a three-bladed turbine was tested for different heads and draft tubes. The mechanical power provided by these turbines was measured to evaluate the range of efficiencies of these systems. A small three-phase generator was developed for coupling with the turbines in order to evaluate the generated electric power. Selected turbines were used to test battery charging with hydroelectric systems and a comparison between several efficiencies of the systems was made.

  13. Downstream effects of a hydroelectric reservoir on aquatic plant assemblages.

    Science.gov (United States)

    Bernez, Ivan; Haury, Jacques; Ferreira, Maria Teresa

    2002-03-16

    Macrophytes were studied downstream of the Rophémel hydroelectric dam on the River Rance (Côtes d'Armor Department, western France) to assess the effects of hydroelectric functioning on river macrophyte communities. We studied ten representative sections of the hydro-peaking channel on five occasions in 1995 and 1996, on a 15-km stretch of river. Floristic surveys were carried out on sections 50 m in length, and genera of macroalgae, species of bryophyta, hydrophytes, and emergent rhizophytes were identified. For the aquatic bryophytes and spermatophytes section of our study, we compared our results with 19th century floristic surveys, before the dam was built. During the vegetative growth period, the hydro-peaking frequency was low. The plant richness was highest near the dam. The macrophyte communities were highly modified according to the distance to the dam. The frequency and magnitude of hydro-peaking was related to the aquatic macrophyte richness in an Intermediate Disturbance Hypothesis position. However, the results of the eco-historical comparison with 19th century floristic surveys point to the original nature of the flora found at the site. Some floral patterns, seen during both periods and at an interval of 133 years, were indicative of the ubiquity of the aquatic flora and of the plants" adaptability. This demonstrates the importance of taking river basin history into account in such biological surveys.

  14. Downstream Effects of a Hydroelectric Reservoir on Aquatic Plant Assemblages

    Directory of Open Access Journals (Sweden)

    Ivan Bernez

    2002-01-01

    Full Text Available Macrophytes were studied downstream of the Rophémel hydroelectric dam on the River Rance (Côtes d’Armor Department, western France to assess the effects of hydroelectric functioning on river macrophyte communities. We studied ten representative sections of the hydro-peaking channel on five occasions in 1995 and 1996, on a 15-km stretch of river. Floristic surveys were carried out on sections 50 m in length, and genera of macroalgae, species of bryophyta, hydrophytes, and emergent rhizophytes were identified. For the aquatic bryophytes and spermatophytes section of our study, we compared our results with 19th century floristic surveys, before the dam was built. During the vegetative growth period, the hydro-peaking frequency was low. The plant richness was highest near the dam. The macrophyte communities were highly modified according to the distance to the dam. The frequency and magnitude of hydro-peaking was related to the aquatic macrophyte richness in an Intermediate Disturbance Hypothesis position. However, the results of the eco-historical comparison with 19th century floristic surveys point to the original nature of the flora found at the site. Some floral patterns, seen during both periods and at an interval of 133 years, were indicative of the ubiquity of the aquatic flora and of the plants’ adaptability. This demonstrates the importance of taking river basin history into account in such biological surveys.

  15. Mercury accumulation in bats near hydroelectric reservoirs in Peninsular Malaysia.

    Science.gov (United States)

    Syaripuddin, Khairunnisa; Kumar, Anjali; Sing, Kong-Wah; Halim, Muhammad-Rasul Abdullah; Nursyereen, Muhammad-Nasir; Wilson, John-James

    2014-09-01

    In large man-made reservoirs such as those resulting from hydroelectric dam construction, bacteria transform the relatively harmless inorganic mercury naturally present in soil and the submerged plant matter into toxic methylmercury. Methylmercury then enters food webs and can accumulate in organisms at higher trophic levels. Bats feeding on insects emerging from aquatic systems can show accumulation of mercury consumed through their insect prey. In this study, we investigated whether the concentration of mercury in the fur of insectivorous bat species was significantly higher than that in the fur of frugivorous bat species, sampled near hydroelectric reservoirs in Peninsular Malaysia. Bats were sampled at Temenggor Lake and Kenyir Lake and fur samples from the most abundant genera of the two feeding guilds-insectivorous (Hipposideros and Rhinolophus) and frugivorous (Cynopterus and Megaerops) were collected for mercury analysis. We found significantly higher concentrations of total mercury in the fur of insectivorous bats. Mercury concentrations also differed significantly between insectivorous bats sampled at the two sites, with bats from Kenyir Lake, the younger reservoir, showing higher mercury concentrations, and between the insectivorous genera, with Hipposideros bats showing higher mercury concentrations. Ten bats (H. cf. larvatus) sampled at Kenyir Lake had mercury concentrations approaching or exceeding 10 mg/kg, which is the threshold at which detrimental effects occur in humans, bats and mice.

  16. Reconnaissance Feasibility Study: Hydroelectric Potential on Lowell Creek

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-03-01

    The feasibility of hydroelectric power development on Lowell Creek near Seward has been investigated at.a reconnaissance level. The study was. conducted because .the physical characteristics of the creek and surrounding terrain initially appeared suitable for hydroelectric power. The creek has a steep gradient (about 400 feet per mile), is fed from a large snowfield, and has two significant drops. One drop is formed by the presence of a dam that was constructed to divert the creek through a mountain and around the town. The second drop of about 65 feet is at the termination of-the diversion tunnel. Three alternative sites for hydroelectric plants were considered, one each at the two drops and one farther upstream at the site of an old abandoned intake and valve house. Two of the sites were considered for 250-kW plants and one for a 100-kW plant. All were limited to a low head, less than 66 feet. Use of an existing dam and tunnel and an abandoned diversion dam and valve house was considered as part of the project alternatives. None of the three alternatives approaches feasibility at this time. Major influencing factors are the high cost of energy at over 13 cents per kWh, the winter freezeup resulting in plant shutdown from November to April, and a large amount of rock sediment carried by the stream and requiring expensive intake structures to skim off the rocks. The most promising alternative (alternative C), which would have a capacity of 250 kW and would produce about 800,000 kWh per year, would fill less than 5 percent of the city's present energy needs. The plant would cost nearly $1 million and produce energy at about 137 mills per kwh. This alternative is the best of the three from the standpoint of its.lower cost, best access via existing all-weather road, least exposure to avalanche and rockslides, and proximity to existing powerlines.

  17. Hydroelectric developments in Nunavik : update on impact benefit agreements

    Energy Technology Data Exchange (ETDEWEB)

    Aatami, P. [Makivik Corp., Makivik, NF (Canada)

    2004-07-01

    The Partnership Agreement on Economic and Community Development in Nunavik is intended to accelerate development of natural resources in Nunavik and promote autonomy of the Inuit regional organizations. This can be accomplished through hydroelectric projects, mining, sport hunting, outfitting and tourism. In recent years, activities in these domains have raised fundamental questions pertaining to the advantages and disadvantages of resource development. The role that the Impact Benefit Agreement has on business opportunities has been examined more closely. The results of the Impact Benefit Agreement and its implication for the Cree Nation and hydro development in untapped regions of northern Quebec were described along with the role of the parties in financing future projects. An overview of the costs, benefits and considerations for hydro opportunities in northern Quebec was presented with reference to the electricity grid and the incentives for large investment. 1 fig.

  18. Ultra-low-head hydroelectric technology: A review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Daqing; Deng, Zhiqun (Daniel)

    2017-10-01

    In recent years, distributed renewable energy-generation technologies, such as wind and solar, have developed rapidly. Nevertheless, the utilization of ultra-low-head (ULH) water energy (i.e., situations where the hydraulic head is less than 3 m or the water flow is more than 0.5 m/s with zero head) has received little attention. We believe that, through technological innovations and cost reductions, ULH hydropower has the potential to become an attractive, renewable, and sustainable resource. This paper investigates potential sites for ULH energy resources, the selection of relevant turbines and generators, simplification of civil works, and project costs. This review introduces the current achievements on ULH hydroelectric technology to stimulate discussions and participation of stakeholders to develop related technologies for further expanding its utilization as an important form of renewable energy.

  19. Benchmarking of Advanced Control Strategies for a Simulated Hydroelectric System

    Science.gov (United States)

    Finotti, S.; Simani, S.; Alvisi, S.; Venturini, M.

    2017-01-01

    This paper analyses and develops the design of advanced control strategies for a typical hydroelectric plant during unsteady conditions, performed in the Matlab and Simulink environments. The hydraulic system consists of a high water head and a long penstock with upstream and downstream surge tanks, and is equipped with a Francis turbine. The nonlinear characteristics of hydraulic turbine and the inelastic water hammer effects were considered to calculate and simulate the hydraulic transients. With reference to the control solutions addressed in this work, the proposed methodologies rely on data-driven and model-based approaches applied to the system under monitoring. Extensive simulations and comparisons serve to determine the best solution for the development of the most effective, robust and reliable control tool when applied to the considered hydraulic system.

  20. Hydroelectric System Response to Part Load Vortex Rope Excitation

    Science.gov (United States)

    Alligné, S.; Nicolet, C.; Bégum, A.; Landry, C.; Gomes, J.; Avellan, F.

    2016-11-01

    The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope on the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of v = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed to analyse potential interactions between hydraulic excitation sources and electrical components.

  1. Greenhouse gas emissions from Brazil’s Amazonian hydroelectric dams

    Science.gov (United States)

    Fearnside, Philip M.

    2016-01-01

    Tropical dams are often falsely portrayed as ‘clean’ emissions-free energy sources. The letter by de Faria et al (2015 Environ. Res. Lett. 10 124019) adds to evidence questioning this myth. Calculations are made for 18 dams that are planned or under construction in Brazilian Amazonia and show that emissions from storage hydroelectric dams would exceed those from electricity generation based on fossil fuels. Fossil fuels need not be the alternative, because Brazil has vast potential for wind and solar power as well as opportunities for energy conservation. Because dam-building is rapidly shifting to humid tropical areas, where emissions are higher than in other climatic zones, the impact of these emissions needs to be given proper weight in energy-policy decisions.

  2. Report on technical feasibility of underground pumped hydroelectric storage

    Science.gov (United States)

    Doherty, T. J.

    1982-03-01

    The technical and economic aspects of constructing a very high head underground hydroelectric pumped storage were examined at a prefeasibility level. Excavation of existing caverns in the West Rutland Vermont marble quarry would be used to construct the underground space. A plant capacity of 1200 MW and 12 h of continuous capacity were chosen as plant operating conditions. The site geology, plant design, and electrical and mechanical equipment required were considered. It was concluded that the cost of the 1200 MW underground pumped storage hydro electric project at this site, even with the proposed savings from marketable material, amount to between $581 and $595 per kilowatt of installed capacity on a January 1982 pricing level. It was concluded that the West Rutland underground pumped storage facility is uneconomic at this time.

  3. Woodruff Narrows low head hydroelectric power plant feasibility determination

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-01

    Woodruff Narrows Reservoir, owned by the State of Utah, was built in 1961 as an irrigation reservoir. The reservoir outlet works and spillway are in need of repair, and plans have been made to enlarge the reservoir from its present capacity of 28,000 acre-feet to 53,200 acre-feet when these repairs are made. The purpose of this study was to determine if it is feasible to add hydropower facilities when the reservoir is repaired and enlarged. A computer simulation model based on mean monthly values, utilizing 26 years of recorded streamflow into the reservoir, was used to determine the mean annual energy potential for the following configurations: (1) present dam, (2) the proposed enlarged dam, (3) a new dam at the lower site with a maximum head of 65 feet, and (4) a new dam at the lower site which would store water to the same elevation as the proposed enlarged dam. Results of the simulation study show that maximum power capacities are respectively 2.1, 3.0, 3.9, and 4.5 megawatts. The marketing potential for this electric power, cost estimates and financial analysis, and environmental, social, and regulatory aspects of the proposed hydropower facilities were evaluated. The results showed the addition of hydroelectric power development at the Woodruff Narrows site would have minimal social and environmental effects on the area, would result in little or no changes in the present patterns of water and land use, income, population, and employment and would not result in any significant changes of the social structure or characteristics of the area. However, hydroelectric power development at the Woodruff Narrows site is not economically feasible at the present time. (LCL)

  4. Mathematical modeling of vibrations in turbogenerator sets of Sayano-Shushenskaya Hydroelectric Power Station

    Science.gov (United States)

    Leonov, G. A.; Kuznetsov, N. V.; Solovyeva, E. P.

    2016-02-01

    Oscillations in turbogenerator sets, which consist of a synchronous generator, a hydraulic turbine, and an automatic speed regulator, are investigated. This study was motivated by the emergency that took place at the Sayano-Shushenskaya Hydroelectric Power Station in 2009. During modeling of the parameters of turbogenerator sets of the Sayano-Shushenskaya Hydroelectric Power Station, the ranges corresponding to undesired oscillation regimes were determined. These ranges agree with the results of the full-scale tests of the hydropower units of the Sayano-Shushenskaya Hydroelectric Power Station performed in 1988.

  5. Legal obstacles and incentives to the development of small scale hydroelectric power in New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in New Jersey are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is discussed. New Jersey follows the riparian theory of water law. Following an extensive discussion of the New Jersey water law, New Jersey regulatory law and financial considerations regarding hydroelectric power development are discussed.

  6. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Taddeucci, Joe [Dept. of Public Works, Boulder, CO (United States). Utilities Division

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  7. Raptor observations associated with Terror Lake hydroelectric project: 1984 annual progress report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Raptors in the vicinity of the Terror Lake Hydroelectric Project (TLHP) were studied to determine the effects of project construction and operation on nesting and...

  8. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  9. Raptor observations associated with Terror Lake Hydroelectric Project: 1983 annual progress report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The report discusses the modification to both bald eagles and rough-legged hawk nesting behavior seen in the Terror Lake Hydroelectric Project area during 1983. A...

  10. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  11. Feasibility study: hydroelectric generating potential, Newcastle and Charlo fish hatcheries for Department of Fisheries and Oceans

    National Research Council Canada - National Science Library

    1984-01-01

    ADI Limited were retained in March 1984 to carry out a feasibility study of potential hydroelectric generation at the Newcastle and Charlo hatchery sites, in accordance with their proposal submitted...

  12. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  13. Water consumption from hydroelectricity in the United States

    Science.gov (United States)

    Grubert, Emily A.

    2016-10-01

    Understanding the relationship between water and energy systems is important for effective management of both resources. Improved data availability has made more comprehensive modeling of hydropower and its water use possible, even as droughts and climate change have made questions about reservoir evaporation responsiveness more timely. This work makes three main contributions: first, it presents national and regional estimates of gross evaporation and evaporation net of evapotranspiration from local land cover ("net evaporation") for U.S. hydroelectricity, arguing that net evaporation is more consistent with other measures of energy-related water intensity; second, it introduces and validates a method for estimating system-wide evaporation based on primary purpose allocation that reduces data requirements by two orders of magnitude; and third, it makes available for public use a full Penman-Monteith model with multiple built-in sensitivity analyses. Based on this model, the U.S. hydropower system consumes an estimated average of 1.7 m3 of net freshwater per GJ electricity produced (11 m3/GJ gross).

  14. Adaptation of historical technical facility on the small hydroelectric power

    OpenAIRE

    Pavlíček, Jan

    2013-01-01

    Malé vodní elektrárny jsou tématem této bakalářské práce, kterou lze dále rozdělit na tři části. První je věnována historii využívání vodní energie, základním typům hydroenergetických děl a klasifikaci vodních elektráren. Druhá část je zaměřena na malé vodní elektrárny. Získané informace jsou na konec využity v závěrečné části popisující návrh přestavby mlýna v Lomech na malou vodní elektrárnu. Small hydroelectric power stations are the topic of this bachelor thesis which can be divided in...

  15. Culinary and pressure irrigation water system hydroelectric generation

    Energy Technology Data Exchange (ETDEWEB)

    Christiansen, Cory [Water Works Engineers, Pleasant Grove City, UT (United States)

    2016-01-29

    Pleasant Grove City owns and operates a drinking water system that included pressure reducing stations (PRVs) in various locations and flow conditions. Several of these station are suitable for power generation. The City evaluated their system to identify opportunities for power generation that can be implemented based on the analysis of costs and prediction of power generation and associated revenue. The evaluation led to the selection of the Battle Creek site for development of a hydro-electric power generating system. The Battle Creek site includes a pipeline that carries spring water to storage tanks. The system utilizes a PRV to reduce pressure before the water is introduced into the tanks. The evaluation recommended that the PRV at this location be replaced with a turbine for the generation of electricity. The system will be connected to the utility power grid for use in the community. A pelton turbine was selected for the site, and a turbine building and piping system were constructed to complete a fully functional power generation system. It is anticipated that the system will generate approximately 440,000 kW-hr per year resulting in $40,000 of annual revenue.

  16. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Taddeucci, Joe [Dept. of Public Works, Boulder, CO (United States). Utilities Division

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  17. Joint Venture Modes of Water Conservancy and Hydroelectric Engineering

    Directory of Open Access Journals (Sweden)

    Zhiding Chen

    2013-07-01

    Full Text Available With the long construction period, the giant scope and complex technology, water conservancy and hydroelectric engineering construction has large investment. In the fully competitive water conservancy and hydropower project construction contracting market, it is almost impossible for a company to contract with a water conservancy and hydropower project independently. Therefore, water conservancy and hydropower project construction can be contracted by several construction companies together, to play each company's strengths, lower offer, improve project quality, shorten the construction period and win the competition. In this paper, we started from the definition of Joint Venture, summed up the forms of Joint Venture in water conservancy and hydropower engineering, proposed that the JV modes can be divided into domestic and international union, tight mode, half-tight mode, loose mode, incorporation and consortium. Furthermore, we analyzed the advantages and disadvantages of Joint Venture. Put forward that the JV can relieve the owner from interfacial administrative work, reduce risk of engineering, and raise the success rate of engineering contract, improve the correctness of price and increase the opportunity of project contracting, Learn from other members, enhance technology and management and make full use of idle resources

  18. Changes in parameters of hydroelectric generators at modernization

    Energy Technology Data Exchange (ETDEWEB)

    Pinsky, Grigori B. [Electrosila, Saint Petersburg (Russian Federation)]. E-mail: ftf@elsila.spb.ru

    2000-07-01

    This paper discusses the changes in parameters of hydroelectric generators at modernization. The lines of approaches in different regions and periods of time have varied depending on economic circumstances arisen and on changes of the property form as well. Therefore, all the attempts undertaken earlier to work out a general concept for realization of the inevitable modernization of the main power equipment of hydraulic electric stations did not give any positive result. Even unified norms on determining the stock service life of such equipment were failed to elaborate. The reasons underlie in the variety of parameters, design versions, manufacturing methods, as well as in the diversity of service conditions, operation duties, culture and quality of repairs, etc. The development of a unified satisfactory algorithm covering all mentioned and other important conditions seems to be impossible. Consequently, the way of expert judgement based upon generalization and analyzing the previous operational experience and enriched with the data of objective control remains to be dominant. From this report discussion it should be evidently drawn a summary conclusion: the present-day potentialities of electric engineering on up-rating the power of generators at modernization, considering the general progress in technologies as well as advances in the sphere of materials, exceed the real needs of potential customers. Practically any demands of such a kind may be covered without extra charges for civil engineering work, hoisting equipment and erection sites.

  19. The La Grande hydroelectric development - James Bay, Quebec

    Energy Technology Data Exchange (ETDEWEB)

    Pare, J-J.; Levay, J.

    1997-10-01

    An historical overview of the James Bay Hydroelectric Power Development in northern Quebec was provided. The account touches upon the foundation of the Societe d`energie de la Baie James, a wholly-owned subsidiary of Hydro-Quebec. It describes the La Grande Complex, and provides a brief summary of the site investigation, the geological and geotechnical considerations, the rock excavation, the construction of embankments and dikes, and nature of the bedrock and overburden foundations. Some of the more interesting problems that arose during the construction such as the settling of the crest in the protective islands surrounding the instruments at some of the dam sites were outlined. Leakage under some of the La Grande 3 low head dikes near the end of the reservoir filling period and the degradation of some of the riprap protection of the Phase One embankments were also described. The solutions designed to overcome these problems were also part of the account of this major mega development project that promoted Quebec into the ranks of the major hydro energy producers in North America. 11 refs., 2 tabs., 3 figs., photos.

  20. Sustainable siting procedure of small hydroelectric plants: The Greek experience

    Energy Technology Data Exchange (ETDEWEB)

    Tsoutsos, Theocharis; Maria, Efpraxia; Mathioudakis, Vassilis [Technical University of Crete, University Campus, GR 73100 Chania (Greece)

    2007-05-15

    This paper aims to present the procedure under which a sustainable plant, like a small hydroelectric plant (SHP), can be installed and deployed, especially in countries with complicated administrative and legislative systems. Those must be defined by the rules that characterize sustainable spatial planning, which aims at the environmental protection, the insurance of better living conditions and finally at the economic development within the frame of the principle of sustainability and its three basic dimensions: social, economical and environmental. The main principles of spatial planning are accepted from the jurisprudence of the Hellenic Council of State, either as an appropriate condition for the protection of important ecosystems or as specific expression of the principle of prevention of environmental damage. In this framework it is accepted that the development is experienced, initially to a total and general planning, whose essential part is the assessment and modification of distributed land uses. Besides, the main characteristics of the siting of SHPs and the criteria demanded for their smooth integration and operation are presented. (author)

  1. Counter rotating type hydroelectric unit suitable for tidal power station

    Energy Technology Data Exchange (ETDEWEB)

    Kanemoto, T [Faculty of Engineering, Kyushu Institute of Technology, Sensui 1-1, Tobata, Kitakyushu 804-8550 (Japan); Suzuki, T, E-mail: turbo@tobata.isc.kyutech.ac.j [Graduate School of Engineering, Kyushu Institute of Technology, Sensui 1-1, Tobata, Kitakyushu 804-8550 (Japan)

    2010-08-15

    The counter rotating type hydroelectric unit, which is composed of the axial flow type tandem runners and the peculiar generator with double rotational armatures,was proposed to utilize effectively the tidal power. In the unit, the front and the rear runners counter drive the inner and the outer armatures of the generator, respectively. Besides, the flow direction at the rear runner outlet must coincide with the flow direction at the front runner inlet, because the angular momentum through the rear runner must coincides with that through the front runner. That is, the flow runs in the axial direction at the rear runner outlet while the axial inflow at the front runner inlet. Such operations are suitable for working at the seashore with rising and falling tidal flows, and the unit may be able to take place of the traditional bulb type turbines. The tandem runners were operated at the on-cam conditions, in keeping the induced frequency constant. The output and the hydraulic efficiency are affected by the adjustment of the front and the blade setting angles. The both optimum angles giving the maximum output and/or efficiency were presented at the various discharges/heads. To promote more the tidal power generation by this type unit, the runners were also modified so as to be suitable for both rising and falling flows. The hydraulic performances are acceptable while the output is determined mainly by the trailing edge profiles of the runner blades.

  2. The twelve dimensional super (2+2)-brane

    CERN Document Server

    Hewson, S F

    1996-01-01

    We discuss supersymmetry in twelve dimensions and present a covariant supersymmetric action for a brane with worldsheet signature (2,2), called a super (2+2)-brane, propagating in the osp(64,12) superspace. This superspace is explicitly constructed, and is trivial in the sense that the spinorial part is a trivial bundle over spacetime, unlike the twisted superspace of usual Poincare supersymmetry. For consistency, it is necessary to take a projection of the superspace. This is the same as the projection required for worldvolume supersymmetry. Upon compactification of this superspace, a torsion is naturally introduced and we produce the membrane and type IIB string actions in 11 and 10 dimensional Minkowski spacetimes. In addition, the compactification of the twelve dimensional supersymmetry algebra produces the correct algebras for these theories, including central charges. These considerations thus give the type IIB string and M-theory a single twelve dimensional origin.

  3. Alcoholics anonymous and other twelve-step programs in recovery.

    Science.gov (United States)

    Detar, D Todd

    2011-03-01

    Recovery is a new way of life for many patients; a life without substances to alter their moods but with a major change improving the physical, psychological, and emotional stability with improved overall health outcomes. The Twelve Steps of the Alcoholics Anonymous (AA) are the foundation of the AA, describing both the necessary actions and the spiritual basis for the recovery program of the AA. The Twelve Steps of the AA provide a structure for which a patient with alcoholism may turn for an answer to their problem of alcohol use, abuse, or dependence. Copyright © 2011 Elsevier Inc. All rights reserved.

  4. The strong coupling regime of twelve flavors QCD

    NARCIS (Netherlands)

    Silva, Tiago Nunes da; Pallante, Elisabetta

    2012-01-01

    We summarize the results recently reported in Ref.[1] [A. Deuzeman, M.P. Lombardo, T. Nunes da Silva and E. Pallante,"The bulk transition of QCD with twelve flavors and the role of improvement"] for the SU(3) gauge theory with Nf=12 fundamental flavors, and we add some numerical evidence and theoret

  5. EFFORTS Technical annex for the twelve month progress report

    DEFF Research Database (Denmark)

    Andreasen, Jan Lasson; Eriksen, Morten; Thomas christensen, Thomas Vennick;

    The present report is documentation for the work carried out at DTU during the second year of project activity. The report describes the work completed by DTU in general as well as on the active sub-tasks within materials properties, friction modelling and physical modelling, over the last twelve...

  6. Human Evolution in Science Textbooks from Twelve Different Countries

    Science.gov (United States)

    Quessada, Marie-Pierre; Clement, Pierre; Oerke, Britta; Valente, Adriana

    2008-01-01

    What kinds of images of human beings illustrate human evolution in school textbooks? A comparison between the textbooks of eighteen different countries (twelve European countries and six non-European countries) was attempted. In six countries (Algeria, Malta, Morocco, Mozambique, Portugal, and Tunisia), we did not find any chapter on the topic of…

  7. Bibliography of Spanish Materials for Students, Grades Seven through Twelve.

    Science.gov (United States)

    California State Dept. of Education, Sacramento.

    This annotated bibliography of Spanish materials for students in grades seven through twelve is divided into the following categories: (1) Art, Drama, Music, and Poetry; (2) Books in Series; (3) Culture; (4) Dictionaries and Encyclopedias; (5) Literature; (6) Mathematics; (7) Physical Education, Health, and Recreation; (8) Reading and Language…

  8. The determinants of cost efficiency of hydroelectric generating plants: A random frontier approach

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Carlos P. [Instituto Superior de Economia e Gestao, Technical University of Lisbon, Rua Miguel Lupi, 20, 1249-078 Lisbon (Portugal); Peypoch, Nicolas [GEREM, IAE, University of Perpignan Via Domitia, 52 avenue Paul Alduy, F-66860 Cedex Perpignan cedex (France)

    2007-09-15

    This paper analyses the technical efficiency in the hydroelectric generating plants of a main Portuguese electricity enterprise EDP (Electricity of Portugal) between 1994 and 2004, investigating the role played by increase in competition and regulation. A random cost frontier method is adopted. A translog frontier model is used and the maximum likelihood estimation technique is employed to estimate the empirical model. We estimate the efficiency scores and decompose the exogenous variables into homogeneous and heterogeneous. It is concluded that production and capacity are heterogeneous, signifying that the hydroelectric generating plants are very distinct and therefore any energy policy should take into account this heterogeneity. It is also concluded that competition, rather than regulation, plays the key role in increasing hydroelectric plant efficiency. (author)

  9. Modeling and Simulation Research on Lightning Over-voltage of 500kV Hydroelectric Station

    Directory of Open Access Journals (Sweden)

    Huang Wang-jun

    2012-08-01

    Full Text Available Lightning over-voltage amplitude of equipments on different branch nodes of the arterials has been obtained after the modeling and simulation analysis based on the EMTP (electromagnetic transients program were done on the lightning over-voltage of a 500kV hydroelectric station was with the system’s worst working condition (single-line, single-transforming, and the line tower on the near side of 500kv hydroelectric station’s GIS was struck by lightning. Thus, precise data have been acquired to select suitable equipments and verify the resisting lightning performance of the station. Finally, reasonable measures (such as reducing pulse resistance of line tower are proposed to improve the comprehensive lightning resisting level of hydroelectric stations.

  10. Interrelations of the Caroni River Basin ecosystems and hydroelectric power projects

    Energy Technology Data Exchange (ETDEWEB)

    Morales, L.C.; Gorzula, S.

    The Caroni is the river with the greatest hydroelectric potential in Venezuela. Large scale hydroelectric projects produce environmental impacts upstream from the dam, due to the formation of an artificial lake, and downstream from the dam, by regulating the river's flow rate. The useful life of a dam for the production of hydroelectricity depends on the rate at which it fills up with sediments, and it's efficiency depends on the maintenance of the hydrological and limnological conditions upon which it was designed. These parameters must be monitored for the duration of the project, and any changes in them must be evaluated. Both environmental impact evaluation and river basin management require basic data about the ecosystems that make up the river basin. However, both the type and detail of the required research to produce base line data must be defined carefully.

  11. Legal obstacles and incentives to the development of small scale hydroelectric projects in Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small scale hydroelectric energy at the state level are discussed. The discussion is designed to aid the developer in the determination of which permits, licenses, and laws of the state must be secured or complied with for the development of a project. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Specific sections that follow are: Massachusetts Water Law; Licensing, Permitting, and Review Procedures; Indirect Considerations (by departments); Department of Public Utilities Regulation of Privately Owned Electric Utilities; Massachusetts Municipal Wholesale Electric Company; Miscellaneous Legal Issues Relating to Low-Head Hydroelectric Power; and Financial Considerations.

  12. Pressurized GRP pipes for hydroelectric plants; GFK-Druckrohrleitungen fuer Wasserkraftanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Kiesselbach, Gerhard [Dr. Kiesselbach Consulting GmbH, Wien (Austria)

    2009-05-15

    GRP pipes have been in successful use for the pressurized pipelines of hydroelectric power plants for many years. This piping stock is notable, in particular, for its low-cost installation, operation and maintenance, in addition to its low weight, simple installation and resistance to corrosion. One can safely assume that GRP pipes will, in future, be used even more for pressurized hydroelectric power-plant piping, in which context it is essential that the corresponding operations during pipe-laying and installation are conducted in accordance with the acknowledged rules of technology and the manufacturer's guidelines. The following article is intended to provide an overview of the planning, installation, operation and maintenance of pressurized GRP pipes for hydroelectric power plants. (orig.)

  13. Optimal operation of cascaded hydroelectric power plants in the power market

    Institute of Scientific and Technical Information of China (English)

    蔡兴国; 马平; 林士颖

    2004-01-01

    An improved network flow algorithm, which includes the minimum cost network flow and the same period network flow, is proposed to solve the optimization of cascaded hydroelectric power plants in a competitive electricity market. The typical network flow is used to find the feasible flow and add the discharge water to different cascaded hydroelectric power plants at the same step. The same period network flow is used to find the optimal flow and add the power output at a different step. This new algorithm retains the advantages of the typical network flow, such as simplicity and ease of realization. The result of the case analysis indicates that the new algorithm can achieve high calculation precision and can be used to calculate the optimal operation of cascaded hydroelectric power plants.

  14. The little hydro-electricity: the boosting?; Petit hydraulique: la relance?

    Energy Technology Data Exchange (ETDEWEB)

    Brunier, S. [Helianthe, Espace Information Energie de l' Ain (France); Najac, C. [Groupement de Producteurs d' Energie Hydroelectrique, 75 - Paris (France); Roussel, A.M. [Electricite Autonome Francaise (EAF), 92 - Le Plessis Robinson (France); Claustre, R [Comite de Liaison Energies Renouvelables (CLER), 93 - Montreuil (France); Baril, D. [Delegue Regional du Conseil Superieur de la Peche, Languedoc Roussillon, PACA, Corse (France); Marty, D.; Lefevre, P. [Hydro-M, 31 - Toulouse (France); Arnould, M. [WWF - Programme Rivieres vivantes, 42 - Saint-Etienne (France)

    2007-05-15

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  15. Impasses e controvérsias da hidreletricidade Impasses and controversies of hydroelectricity

    Directory of Open Access Journals (Sweden)

    Célio Bermann

    2007-04-01

    Full Text Available O presente artigo faz uma avaliação da hidreletricidade no Brasil a partir da sua importância na matriz elétrica do país, do caráter prioritário que a geração hidrelétrica assume na gestão dos recursos hídricos, e dos impasses e controvérsias do ponto de vista social e ambiental decorrentes da implantação e operação dos empreendimentos hidrelétricos. Para ilustrar as questões levantadas com relação às grandes usinas, são referenciados dois estudos de caso - a UHE Tijuco Alto, em processo de licenciamento ambiental pelo Ibama; e a UHE Barra Grande, cujo processo de licenciamento foi marcado por uma série de irregularidades. Por fim, são apontadas possíveis alternativas para a geração hidrelétrica, em particular a repotenciação de usinas e um maior incentivo às pequenas centrais hidrelétricas.This article assesses hydroelectricity in Brazil according to its importance as one of the country’s main energy sources and also to its social and environmental impasses and controversies derived from the implantation and operation of hydroelectric undertakings. In order to illustrate the questions related to large power plants that are brought up along the article, two case reports are presented: Tijuco Alto Hydroelectric Power Plant, which is going through Ibama’s (Brazilian Institute for the Environment and Renewable Natural Resources environmental license process; and Barra Grande Hydroelectric Power Plant, whose environmental license process has been affected by several irregularities. Finally, possible alternatives for hydroelectric production are pointed out, particularly power plant re-potentiation and a greater incentive to undersized hydroelectric plants.

  16. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Science.gov (United States)

    2010-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A... means of a new dam or diversion (as that term is defined in § 292.202(p)) is a qualifying facility...

  17. 77 FR 12280 - FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary...

    Science.gov (United States)

    2012-02-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing... priority is as follows: 1. BOST2 Hydroelectric, LLC, Project No. 13826-000. 2. FFP Missouri 17,...

  18. 77 FR 10740 - Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No...

    Science.gov (United States)

    2012-02-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95... Friends Fund XVIII for Project No. 14261-000, Upper Hydroelectric, LLC for Project No. 14268-000,...

  19. Twelve Theses on Reactive Rules for the Web

    OpenAIRE

    Bry, François; Eckert, Michael

    2007-01-01

    Reactivity, the ability to detect and react to events, is an essential functionality in many information systems. In particular, Web systems such as online marketplaces, adaptive (e.g., recommender) sys- tems, and Web services, react to events such as Web page updates or data posted to a server. This article investigates issues of relevance in designing high-level programming languages dedicated to reactivity on the Web. It presents twelve theses on features desira...

  20. Legal obstacles and incentives to the development of small scale hydroelectric power in Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Pennsylvania, there are 3 methods by which rights in water may be acquired: riparian ownership, prescription, and condemnation. These are discussed.

  1. Least cost addition of power from hydroelectrical developments: Maximizing existing assets

    Energy Technology Data Exchange (ETDEWEB)

    Felix, Lafontant; Briand, Marie-Helene; Veilleux, Rheaume

    2010-09-15

    Hydroelectric developments built in the early 1900's are nearing their useful lifespan and require significant rehabilitation in order to meet modern safety and performance criteria. Also, global increasing energy costs represent a strong incentive for operators to find low-cost, environment-friendly solutions while increasing energy generation at existing facilities. Projects promoting innovative ways of recycling existing developments are great examples of sustainable development and represent win-win solutions for population and hydropower industry alike. The proposed presentation describes successful projects consisting in the rehabilitation or addition of power to existing hydroelectric. These recycling projects are very attractive from both economic and environmental.

  2. Evaluation of the Life Cycle Greenhouse Gas Emissions from Hydroelectricity Generation Systems

    Directory of Open Access Journals (Sweden)

    Akhil Kadiyala

    2016-06-01

    Full Text Available This study evaluated the life cycle greenhouse gas (GHG emissions from different hydroelectricity generation systems by first performing a comprehensive review of the hydroelectricity generation system life cycle assessment (LCA studies and then subsequent computation of statistical metrics to quantify the life cycle GHG emissions (expressed in grams of carbon dioxide equivalent per kilowatt hour, gCO2e/kWh. A categorization index (with unique category codes, formatted as “facility type-electric power generation capacity” was developed and used in this study to evaluate the life cycle GHG emissions from the reviewed hydroelectricity generation systems. The unique category codes were labeled by integrating the names of the two hydro power sub-classifications, i.e., the facility type (impoundment (I, diversion (D, pumped storage (PS, miscellaneous hydropower works (MHPW and the electric power generation capacity (micro (µ, small (S, large (L. The characterized hydroelectricity generation systems were statistically evaluated to determine the reduction in corresponding life cycle GHG emissions. A total of eight unique categorization codes (I-S, I-L, D-µ, D-S, D-L, PS-L, MHPW-µ, MHPW-S were designated to the 19 hydroelectricity generation LCA studies (representing 178 hydropower cases using the proposed categorization index. The mean life cycle GHG emissions resulting from the use of I-S (N = 24, I-L (N = 8, D-µ (N = 3, D-S (N = 133, D-L (N = 3, PS-L (N = 3, MHPW-µ (N = 3, and MHPW-S (N = 1 hydroelectricity generation systems are 21.05 gCO2e/kWh, 40.63 gCO2e/kWh, 47.82 gCO2e/kWh, 27.18 gCO2e/kWh, 3.45 gCO2e/kWh, 256.63 gCO2e/kWh, 19.73 gCO2e/kWh, and 2.78 gCO2e/kWh, respectively. D-L hydroelectricity generation systems produced the minimum life cycle GHGs (considering the hydroelectricity generation system categories with a representation of at least two cases.

  3. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  4. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Bureau of Indian Affairs Final Environmental Impact Statement for Drought Management Planning at the Kerr... Management Planning at the Kerr Hydroelectric Project, Flathead Lake, Montana, is now available for public review and comment. DATES: The BIA will issue a final decision on drought management planning at the Kerr...

  5. Hydroelectric power plant Irape - viability studies; Usina hidroeletrica Irape - estudos de viabilidade

    Energy Technology Data Exchange (ETDEWEB)

    Serran, F.P.; Assumpcao, M.G.

    1994-06-01

    The socio-environmental analysis of the feasibility studies from Irape Hydroelectric Power Plant in Minas Gerais State-Brazil was described including three main questions: the regional insertion mentioning the social conflicts, the social communication program and the basic strategic; the reduction of water volume downstream; the development of programs on the Basic Project Stage.

  6. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Science.gov (United States)

    2010-04-01

    ... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission... increased hydraulic head are in effect. (3) Charges for the use of any facilities such as pipe conduits, outlet works, and so on, installed in, on or near a Commission-sponsored project that benefit...

  7. 76 FR 15971 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference

    Science.gov (United States)

    2011-03-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Eagle Crest Energy as part of its on-going Section 7 Endangered Species Act consultation efforts. e....

  8. 76 FR 22699 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference

    Science.gov (United States)

    2011-04-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... Eagle Crest Energy as part of its on-going Section 7 Endangered Species Act consultation efforts. e....

  9. Analysis of synchronous and induction generators used at hydroelectric power plant

    Science.gov (United States)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  10. 77 FR 9231 - FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing... Parish, Louisiana. The applications were filed by FFP Missouri 17, LLC for Project No. 13824- 000...

  11. 75 FR 77862 - FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2010-12-14

    ... Energy Regulatory Commission FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing... Competing Applications December 7, 2010. On August 6, 2010, FFP Missouri 16, LLC (FFP) and Solia 9... owners' express permission. FFP's Mississippi Lock and Dam 15 Project (Project No. 13825-000)...

  12. 75 FR 51258 - Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice of Application for...

    Science.gov (United States)

    2010-08-19

    ... Energy Regulatory Commission Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice... No.: 2790-055. c. Date Filed: July 6, 2010. d. Applicant: Boott Hydropower, Inc. and Eldred L Field... Hydropower, Inc., One Tech Drive, Suite 220, Andover, MA 01810. Tel: (978) 681-1900 Ext 809. i. FERC Contact...

  13. Competence-Oriented Decision Model for Optimizing the Operation of a Cascading Hydroelectric Power Reservoir

    Directory of Open Access Journals (Sweden)

    Tilahun Derib Asfaw

    2013-07-01

    Full Text Available The operation of the four Perak cascading reservoirs namely, Temenggor, Bersia, Kenering and Chenderoh analyzed using the newly developed genetic algorithm model. The reservoirs are located in the state of Perak of Peninsular Malaysia that used for hydroelectric power generation and flood mitigation. The hydroelectric potential of the cascading scheme is 578 MW. However, the actual annual average generation was 228 MW, which is about 39% of the potential. The research aimed to improve the annual average hydroelectric power generation. The result of the fitness value used to select the optimal option from the test of eight model runs options. After repeated runs of the optimal option, the best model parameters are found. Therefore, optimality achieved at population size of 150, crossover probability of 0.75 and generation number of 60. The operation of GA model produced an additional of 12.17 MW per day. The additional power is found with the same total annual volume of release and similar natural inflow pattern. The additional hydroelectric power can worth over 22 million Ringgit Malaysia per year. In addition, it plays a significant role on the growing energy needs of the country.

  14. 77 FR 21556 - Don Pedro Hydroelectric Project: Turlock Irrigation District; Modesto Irrigation District...

    Science.gov (United States)

    2012-04-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Don Pedro Hydroelectric Project: Turlock Irrigation District; Modesto... Tuolumne Habitats for Anadromous Fish; Request 8--Salmon and Steelhead Full Life-Cycle Population Models...

  15. Determining generator parameters of Camargos hydroelectric power plant through frequency response measurement

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Sebastiao E.M. de; Padua Guarini, Antonio de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Souza, Joao A. de; Valgas, Helio M.; Pinto, Roberto del Giudice R. [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1994-12-31

    This work describes the results of the set frequency response tests performed in the generator number 2, 6.9 kV, 25 MVA, of Camargos hydroelectric power plant, CEMIG, and the parameters relatives to determined structures of model. This tests are unpublished in Brazil. (author) 7 refs., 16 figs., 7 tabs.

  16. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By...

  17. The twelve theses: a call to a new reformation

    Directory of Open Access Journals (Sweden)

    John Shelby Spong

    2015-03-01

    Full Text Available With every discovery emerging from the world of science over the last 500 years concerning the origins of the universe and of life itself, the traditional explanations offered by the Christian Church appeared to be more and more dated and irrelevant.  Christian leaders, unable to embrace the knowledge revolution seemed to believe  that the only way to save Christianity was not to disturb the old patterns either by listening to, much less by entertaining the new knowledge. I tried to articulate this challenge in a book entitled: Why Christianity Must Change or Die, published in 1998.  In that book I examined in detail the issues that I was convinced Christianity must address. Shortly after that book was published I reduced its content to twelve theses, which I attached in Luther-like fashion to the great doors on the Chapel of Mansfield College at Oxford University in the United Kingdom. I then mailed copies of those Twelve Theses to every acknowledged Christian leader of the world. It was an attempt to call them into a debate on the real issues that I was certain the Christian Church now faced.  I framed my twelve theses in the boldest, most provocative language possible, designed primarily to elicit response and debate. I welcome responses from Christians everywhere.  I claim no expertise or certainty in developing answers, but I am quite confident that I do understand the problems we are facing as Christians who are seeking to relate to the 21st century.

  18. Twelve tips for teaching medical students with dyslexia.

    Science.gov (United States)

    Shaw, Sebastian Charles Keith; Anderson, John Leeds

    2017-07-01

    Dyslexia is a common learning difficulty. As a result of SS' own experiences as a medical student with dyslexia, we have been researching and teaching on this topic for the past two years. Here, we present twelve tips for teaching medical students with dyslexia. These are gathered from our personal experiences and research, discussions with other educators, and wider literature on the topic. This article aims to shed some light on dyslexia, and also to make practical suggestions. Teaching students with dyslexia should not be a daunting experience. Small changes to existing methods, at minor effort, can make a difference - for example, adding pastel colors to slide backgrounds or avoiding Serif fonts. These tips can help educators gain more insight into dyslexia and incorporate small, beneficial adaptations into their teaching.

  19. Antibacterial activities of extracts from twelve Centaurea species from Turkey

    Directory of Open Access Journals (Sweden)

    Tekeli Yener

    2011-01-01

    Full Text Available Members of the genus Centaurea (Asteraceae have been used in traditional plant-based medicine. The methanol extracts of twelve Centaurea species, of which five are endemic to Turkey flora, were screened for antibacterial activity against four bacteria (Escherichia coli, Bacillus cereus, Salmonella enteritidis, Staphylococcus aureus. The antibacterial activity was evaluated by the microdilution method and the minimum inhibition concentrations (MIC of the extracts were determined. C. cariensis subsp. microlepis exhibited an antimicrobial effect on all tested microorganisms. The extracts from eight Centaurea species (C. balsamita, C. calolepis, C. cariensis subsp. maculiceps, C. cariensis subsp. microlepis, C. kotschyi var. kotschyi, C. solstitialis subsp. solstitialis, C. urvillei subsp. urvillei and C. virgata possessed antibacterial activity against several of the tested microorganisms.

  20. Twelve tips on how to compile a medical educator's portfolio.

    Science.gov (United States)

    Dalton, Claudia Lucy; Wilson, Anthony; Agius, Steven

    2017-09-17

    Medical education is an expanding area of specialist interest for medical professionals. Whilst most doctors will be familiar with the compilation of clinical portfolios for scrutiny of their clinical practice and provision of public accountability, teaching portfolios used specifically to gather and demonstrate medical education activity remain uncommon in many non-academic settings. For aspiring and early career medical educators in particular, their value should not be underestimated. Such a medical educator's portfolio (MEP) is a unique compendium of evidence that is invaluable for appraisal, revalidation, and promotion. It can stimulate and provide direction for professional development, and is a rich source for personal reflection and learning. We recommend that all new and aspiring medical educators prepare an MEP, and suggest twelve tips on how to skillfully compile one.

  1. Spectroscopy of twelve Type Ia supernovae at intermediate redshift

    CERN Document Server

    Balland, C; Pain, R; Walton, N A; Amanullah, R; Astier, Pierre; Ellis, Richard S; Fabbro, S; Goobar, A; Hardin, D; Hook, I M; Irwin, M J; McMahon, R M; Mendez, J M; Ruiz-Lapuente, P; Sainton, G; Schahmaneche, K; Stanishev, V

    2005-01-01

    We present spectra of twelve Type Ia supernovae obtained in 1999 at the William Herschel Telescope and the Nordic Optical Telescope during a search for Type Ia supernovae (SN Ia) at intermediate redshift. The spectra range from z=0.178 to z=0.493, including five high signal-to-noise ratio SN Ia spectra in the still largely unexplored range 0.15 < z < 0.3. Most of the spectra were obtained before or around restframe B-band maximum light. None of them shows the peculiar spectral features found in low-redshift over- or under-luminous SN Ia. Expansion velocities of characteristic spectral absorption features such as SiII at 6355 angs., SII at 5640 angs. and CaII at 3945 angs. are found consistent with their low-z SN Ia counterparts.

  2. Efficiency on execution of environmental regulations for hydroelectric enterprising; Eficiencia na execucao das normas ambientais para empreendimentos hidroeletricos

    Energy Technology Data Exchange (ETDEWEB)

    Nadaud, Gabriela Caiuby Ariani; Young, Carlos Eduardo Frickmann [Universidade Federal do Rio de Janeiro (IE/GEMA/UFRJ), RJ (Brazil). Inst. de Economia. Grupo de Economia do Meio Ambiente e do Desenvolvimento Sustentavel], E-mail: young@ie.ufrj.br

    2010-07-01

    Viewing a more efficiency in the accomplishment of environmental regulations related to hydroelectric enterprises, this paper presents a proposal for indexes which can help the enterprise. From the verification that the accomplishment of legal requests to obtain the licensing does not minimizes the conflict risks and the consequent expenses, this index methodology presents himself as an tool which allows more efficient compensation measurements and the consequent reduction of the social-environmental costs of the hydroelectric enterprises.

  3. Impact of hydroelectric projects on river environment: Analysis of water quality changes in Ningxia Reach of Yellow River

    OpenAIRE

    Sun Dongpo; Lu Ruili; Song Yongjun; Yan Jun

    2008-01-01

    In this paper, the relationship between hydroelectric projects and the river environment is analyzed. Recently, the large-scale regulation of runoff by large hydroelectric projects in the Ningxia Reach of the Yellow River has altered natural runoff processes, causing an increase in the probability of low discharge and an overall adjustment of riverbed evolution and river characteristics. During low-flow years, the combined effects of these two changes can weaken the self-purification capacity...

  4. Efficiency analysis of hydroelectric generating plants: A case study for Portugal

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Carlos Pestana [Instituto Superior de Economia e Gestao, Technical University of Lisbon, Rua Miguel Lupi, 20, 1249-078 Lisbon (Portugal)

    2008-01-15

    This paper estimates changes in total productivity, breaking this down into technically efficient change and technological change, by means of data envelopment analysis (DEA) applied to the hydroelectric energy generating plants of EDP - the Portugal Electricity Company. The aim of this procedure is to seek out those best practices that will lead to improved performance in the energy market. We rank the plants according to their change in total productivity for the period 2001-2004, concluding that some plants experienced productivity growth while others experienced a decrease in productivity. The implications arising from the study are that EDP should adopt an internal benchmark management procedure in order to evaluate the relative position of each hydroelectric generating plant and to adopt managerial strategies designed to catch up with the frontier of 'best practices'. As the frontier is shifting along the time, constant efforts are needed in this respect along the time. (author)

  5. Efficiency analysis of hydroelectric generating plants: a case study for Portugal

    Energy Technology Data Exchange (ETDEWEB)

    Pestana Barros, C. [Technical University of Lisbon (Portugal). Instituto Superior de Economia e Gestao

    2008-01-15

    This paper estimates changes in total productivity, breaking this down into technically efficient change and technological change, by means of data envelopment analysis (DEA) applied to the hydroelectric energy generating plants of EDP - the Portugal Electricity Company. The aim of this procedure is to seek out those best practices that will lead to improved performance in the energy market. We rank the plants according to their change in total productivity for the period 2001-2004, concluding that some plants experienced productivity growth while others experienced a decrease in productivity. The implications arising from the study are that EDP should adopt an internal benchmark management procedure in order to evaluate the relative position of each hydroelectric generating plant and to adopt managerial strategies designed to catch up with the frontier of ''best practices''. As the frontier is shifting along the time, constant efforts are needed in this respect along the time. (author)

  6. Dam safety review, classification of dams for the Novia Scotia Power Inc. Black River hydroelectric system

    Energy Technology Data Exchange (ETDEWEB)

    Alderman, Aaron; Small, Andy [AMEC Earth and environmental, Fredericton, (Canada); O' Neil, Ellis [Nova Scotia Power Inc., Halifax, (Canada)

    2010-07-01

    In 2009, AMEC was retained by Nova Scotia Power Inc. (NSPI) to conduct a dam safety review of the dams that are part of the Black River Hydroelectric System. This paper presented the results of this dam classification exercise which was carried out for the Bear River hydroelectric system in Nova Scotia, based on the 2007 Canadian Dam Association (CDA) dam safety guidelines. Flood mapping and dam-break analysis were performed for events ranging from the 1:100 year to PMF flood events, including cascading events. These results were used to draw up a classification of the dams. Associated design criteria were then developed. Following the assessment of the dam sites, conclusions and recommendations were discussed. The recommendations were presented in terms of regular maintenance items and reconstruction items, which are now used by NSPI to determine the party responsible for undertaking the recommendation and for evaluation of the maintenance and reconstruction schedules.

  7. Legal obstacles and incentives to the development of small scale hydroelectric power in Ohio

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. A developer must obtain title or interest to a streambed from the proper riparian owners. Ohio provides assistance to an electric company in this undertaking by providing it with the power of eminent domain in the event it is unable to reach a purchase agreement with the riparian proprietors. The Ohio Water Law is discussed in detail, followed by discussions: Licensing, Permitting, and Review Procedures; Indirect Considerations; Ohio Public Utilities Commission; Ohio Department of Energy; Incidental Provision; and Financial Considerations.

  8. Legal obstacles and incentives to the development of small scale hydroelectric power in Connecticut

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric power in Connecticut are discussed. The Federal government also exercises extensive regulatory authority in the area and this dual system is examined from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. Connecticut follows the riparian theory of water law. Under this theory of the water law, private rights in rivers and streams are confined to the use of flowing water. A riparian proprietor does not own the water that flows by his estate. Licensing, permitting, and review procedures are discussed followed by discussion on public utilities regulation and indirect considerations.

  9. Legal obstacles and incentives to the development of small scale hydroelectric power in Indiana

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy in Indiana are examined. The Federal government also exercises extensive regulatory authority in the area. An examination is made of the Federal-state relationships with the aim of creating a more orderly understanding of the vagaries of the system. The introductory chapter examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. The Indiana water law; direct and indirect regulations; the Public Service Commission of Indiana; and financial considerations are examined.

  10. Legal obstacles and incentives to the development of small scale hydroelectric potential in Illinois

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of the hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. The first obstacle which every developer in Illinois must confront is obtaining authority to utilize the river bed, banks, and flowing water at the proposed site. This involves determination of ownership of the stream banks and bed and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Illinois follows the riparian theory of water law. Following the detailed discussion of the water law, direct and indirect regulations and financial considerations are discussed.

  11. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 3. Mid-Continent region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The US Corps of Engineers' assessment of the nation's hydroelectric resources provides a current and comprehensive estimate of the potential for incremental or new generation at existing dams and other water resource projects, as well as for undeveloped sites in the US. The demand for hydroelectric power is addressed and various related policy and technical considerations are investigated to determine the incentives, constraints, and impacts of developing hydropower to meet a portion of the future energy demands. The comprehensive data represent the effort of the Corps of Engineers based on site-specific analysis and evaluation. Summary tables include estimates of the potential capacity and energy at each site in the inventory. The number of sites and potential capacity in each state are identified, but specific detailed information is included for sites in Colorado, Kansas, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, South Dakota, Texas, and Wyoming.

  12. High Rhine power plant Rheinfelden and hydroelectric power in Germany; Hochrheinkraftwerk Rheinfelden und Wasserkraft in Deutschland

    Energy Technology Data Exchange (ETDEWEB)

    Mazurkiewicz, Jacek [EnBW Energie Baden-Wuerttemberg AG, Karlsruhe (Germany)

    2011-10-15

    In Germany, electric energy had been generated from water power since 1880; in the beginning, it was a dominating factor along with energy generation from coal, but it lost its importance as from 1950 when crude oil, natural gas and nuclear power became dominant. Since 1991, however, many small hydroelectric power plants have again been put into operation, or have been newly built, as a consequence of the government aids granted. In the Hochrhein (High Rhine) region, the German-Swiss power plant Rheinfelden was reconstructed, and other major hydroelectric power plants are being modernized. Technically, a much greater potential could be used, but this is currently not practicable for economical and ecological reasons. (orig.)

  13. Does the creation of a boreal hydroelectric reservoir result in a net change in evaporation?

    Science.gov (United States)

    Strachan, Ian B.; Tremblay, Alain; Pelletier, Luc; Tardif, Simon; Turpin, Christian; Nugent, Kelly A.

    2016-09-01

    Estimates of water consumption from hydroelectricity production are hampered by a lack of common methodological approaches. Studies typically use gross evaporation estimates which do not take into account the evaporative water loss from the pre-flooded ecosystems that would occur without the presence of a reservoir. We evaluate the net change in evaporation following the creation of a hydroelectric reservoir located in the Canadian boreal region. We use a direct measurement technique (eddy covariance) over four different ecosystems to evaluate the pre- and post-flood landscape water flux over a five-year period. The net effect of reservoir creation was to increase evaporation over that of the pre-flooded ecosystem. This change was dependent both on management and differences in the timing of the evaporation with nighttime and autumn contributing strongly to the reservoir evaporation. Managed reduction of water level, and thus the evaporating area, reduced the evaporation.

  14. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    Energy Technology Data Exchange (ETDEWEB)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  15. Synanthropy of mosquitoes and sand flies near the Aimorés hydroelectric power plant, Brazil.

    Science.gov (United States)

    Barata, R A; Ursine, R L; Nunes, F P; Morais, D H; Araújo, H S

    2012-12-01

    The environmental changes resulting from the construction of hydroelectric dams may affect the fauna of insect vectors and consequently the epidemiology of the diseases they transmit. This work examined the mosquito and sand fly fauna in the area of the Aimorés hydroelectric power plant, analyzing the seasonal distribution and the degree of species synanthropy in different ecotopes. Between November, 2008 and September, 2009, entomological captures were performed with the help of HP light traps in the rural, urban, and forest areas of Aimorés, Ituêta, Resplendor, and Baixo Guandu counties. The fauna proved to be quite diversified. Twenty-two species of mosquitoes and 11 species of sand flies were found. Culex quinquefasciatus was predominant among mosquitoes (76.7%), while Lutzomyia intermedia prevailed among sand flies (34.5%). Some of the captured species have medical interest. Supported by the high degree of synanthropy, those species reinforce the need for epidemiological surveillance.

  16. Pump as turbines in hydroelectric engineering; Pumpen als Turbinen in der Wasserwirtschaft

    Energy Technology Data Exchange (ETDEWEB)

    Orchard, Bryan

    2010-07-01

    When a liquid flows backwards through a gyropump, i.e. from the outlet side to the inlet side, the rotational direction of the rotor will revert. Given a sufficient height of drop, the breakaway torque of the rotor and shaft will be overcome. The rotary momentum can be used, e.g., for driving a generator. An example of such an application is found in the Breech hydroelectric power plant of the Stuttgarter Landeswasserversorgung utility. (orig.)

  17. Feasibility study for a hydroelectric installation on the Arno River (Italy)

    OpenAIRE

    Micheli, Lorenzo

    2011-01-01

    Energy need is a primary requirement of our society. Many interests and concerns turn around this matter. It includes policy, economy, environment, etc... Renewable energy is considered to be a good alternative from fossil sources and nuclear power. Renewable sources are known as “green” because of the low impact on the Earth equilibriums. Furthermore they are not exhaustible because they utilize the ecosystem cycles. Hydroelectricity is an established technology. In most of...

  18. Use of mediation to resolve the dispute over low-head hydroelectric development at Swan Lake

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, D.

    1980-08-01

    In 1978, the Maine Hydroelectric Development Corporation announced that the company planned to renovate five dams on the Goose River near Belfast, Maine to generate electricity. The most important part of the plan involved the use of the first of the dams, at the lower end of Swan Lake, to regulate the flow of water to the downstream dams. For Maine Hydro, management of the Swan Lake dam could make an otherwise marginal proposal lucrative. However, Swan Lake is vitally important to the residents of Swanville. The town was so concerned about the impact of this proposed hydroelectric project that it petitioned the Federal Energy Regulatory Commission (FERC) to deny Maine Hydro's application on the grounds that it would damage the environment, reduce property values and eliminate recreational opportunities for its citizens. This report was written by the mediator of the dispute and represents the views and behavior of the parties as the mediator understood them. It is intended to present the mediator's observations in a way which will inform and assist others who may someday face a difficult situation like the one the Town of Swanville and Maine Hydroelectric Development Corporation faced, and successfully resolved, in the spring and summer of 1979.

  19. Legal obstacles and incentives to the development of small scale hydroelectric power in New York

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step the small scale hydroelectric developer must take is that of acquiring title to the real property comprising the development site. The real estate parcel must include the requisite interest in the land adjacent to the watercourse, access to the underlying streambed and where needed, the land necessary for an upstream impoundment area. Land acquisition may be effectuated by purchase, lease, or grant by the state. In addition to these methods, New York permits the use of the eminent domain power of the state for public utilities under certain circumstances.

  20. Legal obstacles and incentives to the development of small scale hydroelectric power in West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric in West Virginia at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by FERC. The development of small-scale hydroelectric energy depends on the selection of a site which will produce sufficient water power capacity to make the project economically attractive to a developer. In West Virginia, the right to use the flowing waters of a stream, creek, or river is appurtenant to the ownership of the lands bordering the watercourse. The lands are known as riparian lands. The water rights are known as riparian rights. Thus, the first obstacle a developer faces involves the acquisition of riparian lands and the subsequent right to the use of the water. The water law in West Virginia is discussed in detail followed by discussions on direct and indirect regulations; continuing obligations; financial considerations; and interstate organizations.

  1. Analysis of the Level-Release Polynomial from a Hydroelectric Plant

    Directory of Open Access Journals (Sweden)

    Ieda Hidalgo

    2012-02-01

    Full Text Available The mathematic representation of the tailrace elevation as function of the water release can be modified, for example, by the geomorphologic impact of large floods. The level-release polynomial from a hydroelectric plant is important information to computational models used for optimization and simulation of the power generation systems operation. They depend on data quality to provide reliable results. Therefore, this paper presents a method for adjusting of the tailrace polynomial based on operation data recorded by the plant’s owner or company. The proposed method uses a non-linear regression tool, such as Trendline in Excel. A case study has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System ational Operator. The benefits of the data correction are analyzed using a simulation model for the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, first with official data and second with adjusted data. The results show significant improvements in terms of quality of the data, contributing to bring the real and simulated operation closer.

  2. 3D integrated modeling approach to geo-engineering objects of hydraulic and hydroelectric projects

    Institute of Scientific and Technical Information of China (English)

    ZHONG DengHua; LI MingChao; LIU Jie

    2007-01-01

    Aiming at 3D modeling and analyzing problems of hydraulic and hydroelectric engineering geology, a complete scheme of solution is presented. The first basis was NURBS-TIN-BRep hybrid data structure. Then, according to the classified thought of the object-oriented technique, the different 3D models of geological and engineering objects were realized based on the data structure, including terrain class,strata class, fault class, and limit class; and the modeling mechanism was alternative. Finally, the 3D integrated model was established by Boolean operations between 3D geological objects and engineering objects. On the basis of the 3D model,a series of applied analysis techniques of hydraulic and hydroelectric engineering geology were illustrated. They include the visual modeling of rock-mass quality classification, the arbitrary slicing analysis of the 3D model, the geological analysis of the dam, and underground engineering. They provide powerful theoretical principles and technical measures for analyzing the geological problems encountered in hydraulic and hydroelectric engineering under complex geological conditions.

  3. 3D integrated modeling approach to geo-engineering objects of hydraulic and hydroelectric projects

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    Aiming at 3D modeling and analyzing problems of hydraulic and hydroelectric en-gineering geology,a complete scheme of solution is presented. The first basis was NURBS-TIN-BRep hybrid data structure. Then,according to the classified thought of the object-oriented technique,the different 3D models of geological and engi-neering objects were realized based on the data structure,including terrain class,strata class,fault class,and limit class;and the modeling mechanism was alterna-tive. Finally,the 3D integrated model was established by Boolean operations be-tween 3D geological objects and engineering objects. On the basis of the 3D model,a series of applied analysis techniques of hydraulic and hydroelectric engineering geology were illustrated. They include the visual modeling of rock-mass quality classification,the arbitrary slicing analysis of the 3D model,the geological analysis of the dam,and underground engineering. They provide powerful theoretical prin-ciples and technical measures for analyzing the geological problems encountered in hydraulic and hydroelectric engineering under complex geological conditions.

  4. Analysis of the Level-Release Polynomial from a Hydroelectric Plant

    Directory of Open Access Journals (Sweden)

    Ieda Hidalgo

    2012-02-01

    Full Text Available The mathematic representation of the tailrace elevation as function of the water release can be modified, for example, by the geomorphologic impact of large floods. The level-release polynomial from a hydroelectric plant is important information to computational models used for optimization and simulation of the power generation systems operation. They depend on data quality to provide reliable results. Therefore, this paper presents a method for adjusting of the tailrace polynomial based on operation data recorded by the plant’s owner or company. The proposed method uses a non-linear regression tool, such as Trendline in Excel. A case study has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System ational Operator. The benefits of the data correction are analyzed using a simulation model for the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, first with official data and second with adjusted data. The results show significant improvements in terms of quality of the data, contributing to bring the real and simulated operation closer.

  5. Viewpoint – Fifty Years of Hydroelectric Development in Chile: A History of Unlearned Lessons

    Directory of Open Access Journals (Sweden)

    Michael Nelson

    2013-06-01

    Full Text Available The development of hydroelectricity in Chile illustrates a situation where water resources can be both well and badly managed when a private or public utility company, in this case ENDESA, is powerful enough to operate largely outside standard policy and bureaucratic processes. It successfully increased hydroelectric capacity more than fourfold over three decades characterised by periods of significant political instability. This was done without noticeable conflict due to its recognised efficiency and absence of environmental concerns in Chilean policy until the late 1980s. Since that time there has been increasing pressure from international agencies and NGOs to place more emphasis on environmental dimensions in development. The interplay among the diversity of agendas and tactics adopted by the interest groups attempting to influence decision on hydroelectric projects has, in some cases, been counterproductive. ENDESA chose to withhold information and modify EIA procedures as tactics to reduce costs. The NGOs’ single-minded dedication to preclusion of dam proposals tended to distort public debate. The government, presumably due to risk aversion, proved unwilling to take a proactive stance by not specifying and implementing requirements for approval of a dam project, providing a comprehensive policy framework for debate or facilitating dialogue on the issues.

  6. NSGA-II for optimizing water supply and hydroelectric power generation of Two-Reservoir System

    Science.gov (United States)

    Wang, K.; Chang, L.; Chang, F.

    2008-12-01

    Taiwan is located at the subtropical zone, which has nonuniform temporal and spatial distributions of precipitation. The Jhuoshuei River is the Taiwan longest river (186 Km) and has abundant water resources. In the last several decades, the constant population growth and the dramatic economic development have resulted in a tremendous demand for natural resources, especially water. How to effectively manage the water resources is one of the most important task for hydrologist. This paper presents a non-dominated sorting genetic algorithm (NSGA-II) to derive a set of optimal joint operating rule curves for a two-reservoir system, Wu-She Reservoir and Jih-Yueh-Tan Reservoir, in the Jhuoshuei river system. These two series reservoirs are the most important reservoirs for supplying water and hydroelectric power generation. The NSGA-II is coupled with an integrated operational simulation model to search the optimal joint rule curves for minimizing shortage indices (SI) and maximizing Hydroelectric Power generation. The Pareto-front solutions obtained from NSGA-II provide the decision maker with a wide range of choices. The results indicate that NSGA-II is a promising approach. The plentiful optimal solutions along the Pareto front allow the decision maker to choose the best compromise solution after consideration of the trade-offs between water supply and hydroelectric power generation.

  7. Twelve novel Atm mutations identified in Chinese ataxia telangiectasia patients.

    Science.gov (United States)

    Huang, Yu; Yang, Lu; Wang, Jianchun; Yang, Fan; Xiao, Ying; Xia, Rongjun; Yuan, Xianhou; Yan, Mingshan

    2013-09-01

    Ataxia telangiectasia (A-T) is an autosomal recessive disease characterized mainly by progressive cerebellar ataxia, oculocutaneous telangiectasia, and immunodeficiency. This disease is caused by mutations of the ataxia telangiectasia mutated (Atm) gene. More than 500 Atm mutations that are responsible for A-T have been identified so far. However, there have been very few A-T cases reported in China, and only two Chinese A-T patients have undergone Atm gene analysis. In order to systemically investigate A-T in China and map their Atm mutation spectrum, we recruited eight Chinese A-T patients from six unrelated families nationwide. Using direct sequencing of genomic DNA and the multiplex ligation-dependent probe amplification, we identified twelve pathogenic Atm mutations, including one missense, four nonsense, five frameshift, one splicing, and one large genomic deletion. All the Atm mutations we identified were novel, and no homozygous mutation and founder-effect mutation were found. These results suggest that Atm mutations in Chinese populations are diverse and distinct largely from those in other ethnic areas.

  8. Oral papillary squamous cell carcinoma in twelve dogs.

    Science.gov (United States)

    Nemec, A; Murphy, B G; Jordan, R C; Kass, P H; Verstraete, F J M

    2014-01-01

    Papillary squamous cell carcinoma (PSCC) is a distinct histological subtype of oral squamous cell carcinoma (SCC), described in both dogs and man. In dogs, PSCC has long been considered a malignant oral tumour of very young animals, but it has recently been reported to occur in adult dogs as well. The aim of this study was to describe the major clinicopathological characteristics of canine oral PSCC (COPSCC). Twelve dogs diagnosed with COPSCC were included in this retrospective study (1990-2012). The majority (75%) of the dogs were >6 years of age (median age 9 years). All tumours were derived from the gingiva of dentate jaws, with 66.7% affecting the rostral aspects of the jaws. The gross appearance of the lesions varied, with one having an intraosseous component only. The majority (91.7%) of the tumours were advanced lesions (T2 and T3), but no local or distant metastases were noted. Microscopically, two patterns were seen: (1) invasion of bone forming a cup-shaped indentation in the bone or a deeply cavitating cyst within the bone (cavitating pattern), (2) histologically malignant growth, but lack of apparent bone invasion (non-cavitating pattern). The microscopical appearance corresponded to imaging findings in a majority of cases, with cavitating forms presenting with a cyst-like pattern of bone loss or an expansile mass on imaging and non-cavitating forms showing an infiltrative pattern of bone destruction on imaging. These features suggest two distinct biological behaviours of COPSCC.

  9. Sensitivity and growth of twelve Elatior begonia cultivars to ozone

    Energy Technology Data Exchange (ETDEWEB)

    Reinert, R.A.; Nelson, P.V.

    1979-12-01

    Twelve cultivars of Elatior begonia (Begonia X hiemalis Fotsch.) were exposed to O/sub 3/ at 25 and 50 pphM. The 'Schwabenland' group, 'Whisper 'O' Pink', and 'Improved Krefeld Orange' were the most sensitive, whereas 'Ballerina', 'Mikkell Limelight', and 'Turo' were the least sensitive. 'Rennaisance', 'Heirloom' 'Nixe', and 'Fantasy' were intermediate in sensitivity. The dry weight of foliage (stems plus leaves) of 9 cultivars exposed to O/sub 3/ was significantly less than that of control plants. Ozone at 25 and 50 pphM inhibited flower growth (including peduncles) and development in 4 and 8 of the 12 cultivars, respectively. Differences in flower weight ranged from 43 to 105% of the control at 25 pphM and from 25 to 98% of the control at 50 pphM, depending on cultivar. 1 table.

  10. Twelve tips for designing and running longitudinal integrated clerkships.

    Science.gov (United States)

    Ellaway, Rachel; Graves, Lisa; Berry, Sue; Myhre, Doug; Cummings, Beth-Ann; Konkin, Jill

    2013-12-01

    Longitudinal integrated clerkships (LICs) involve learners spending an extended time in a clinical setting (or a variety of interlinked clinical settings) where their clinical learning opportunities are interwoven through continuities of patient contact and care, continuities of assessment and supervision, and continuities of clinical and cultural learning. Our twelve tips are grounded in the lived experiences of designing, implementing, maintaining, and evaluating LICs, and in the extant literature on LICs. We consider: general issues (anticipated benefits and challenges associated with starting and running an LIC); logistical issues (how long each longitudinal experience should last, where it will take place, the number of learners who can be accommodated); and integration issues (how the LIC interfaces with the rest of the program, and the need for evaluation that aligns with the dynamics of the LIC model). Although this paper is primarily aimed at those who are considering setting up an LIC in their own institutions or who are already running an LIC we also offer our recommendations as a reflection on the broader dynamics of medical education and on the priorities and issues we all face in designing and running educational programs.

  11. Commercializing Government-sponsored Innovations: Twelve Successful Buildings Case Studies

    Science.gov (United States)

    Brown, M. A.; Berry, L. G.; Goel, R. K.

    1989-01-01

    This report examines the commercialization and use of R and D results funded by DOE's Office of Buildings and Community Systems (OBCS), an office that is dedicated to improving the energy efficiency of the nation's buildings. Three goals guided the research described in this report: to improve understanding of the factors that hinder or facilitate the transfer of OBCS R and D results, to determine which technology transfer strategies are most effective and under what circumstances each is appropriate, and to document the market penetration and energy savings achieved by successfully-commercialized innovations that have received OBCS support. Twelve successfully-commercialized innovations are discussed here. The methodology employed involved a review of the literature, interviews with innovation program managers and industry personnel, and data collection from secondary sources. Six generic technology transfer strategies are also described. Of these, contracting R and D to industrial partners is found to be the most commonly used strategy in our case studies. The market penetration achieved to date by the innovations studied ranges from less than 1% to 100%. For the three innovations with the highest predicted levels of energy savings (i.e., the flame retention head oil burner, low-E windows, and solid-state ballasts), combined cumulative savings by the year 2000 are likely to approach 2 quads. To date the energy savings for these three innovations have been about 0.2 quads. Our case studies illustrate the important role federal agencies can play in commercializing new technologies.

  12. The strong coupling regime of twelve flavors QCD

    CERN Document Server

    da Silva, Tiago Nunes

    2012-01-01

    We summarize the results recently reported in Ref.[1] [A. Deuzeman, M.P. Lombardo, T. Nunes da Silva and E. Pallante,"The bulk transition of QCD with twelve flavors and the role of improvement"] for the SU(3) gauge theory with Nf=12 fundamental flavors, and we add some numerical evidence and theoretical discussion. In particular, we study the nature of the bulk transition that separates a chirally broken phase at strong coupling from a chirally restored phase at weak coupling. When a non-improved action is used, a rapid crossover is observed at small bare quark masses. Our results confirm a first order nature for this transition, in agreement with previous results we obtained using an improved action. As shown in Ref.[1], when improvement of the action is used, the transition is preceded by a second rapid crossover at weaker coupling and an exotic phase emerges, where chiral symmetry is not yet broken. This can be explained [1] by the non hermiticity of the improved lattice Transfer matrix, arising from the c...

  13. Summary of the New England conference on legal and institutional incentives to small-scale hydroelectric development (Boston Massachusetts, January 30-31, 1979)

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    The New England Conference on Legal and Institutional Incentives to Small Scale Hydroelectric Development examined the legal and institutional problems confronting small-scale hydroelectric potential of the northeast. Representatives from DOE, FERC, state legislatures, state public service commissions, private developers, and environmental groups attempted to evaluate the state of hydroelectric development in New England. The meeting began with an introductory panel followed by workshops addressing four topics: Federal regulatory systems, state regulatory systems, the economics of small-scale hydroelectric development, and systems dynamics and the systems dynamics model. Comments by the Honorable Georgiana H. Sheldon, FERC, are presented.

  14. The Synthesis and Antitumor Activity of Twelve Galloyl Glucosides

    Directory of Open Access Journals (Sweden)

    Chang-Wei Li

    2015-01-01

    Full Text Available Twelve galloyl glucosides 1–12, showing diverse substitution patterns with two or three galloyl groups, were synthesized using commercially available, low-cost D-glucose and gallic acid as starting materials. Among them, three compounds, methyl 3,6-di-O-galloyl-α-D-glucopyranoside (9, ethyl 2,3-di-O-galloyl-α-D-glucopyranoside (11 and ethyl 2,3-di-O-galloyl-β-D-glucopyranoside (12, are new compounds and other six, 1,6-di-O-galloyl-β-D-glucopyranose (1, 1,4,6-tri-O-galloyl-β-D-glucopyranose (2, 1,2-di-O-galloyl-β-D-glucopyranose (3, 1,3-di-O-galloyl-β-D-glucopyranose (4, 1,2,3-tri-O-galloyl-α-D-glucopyranose (6 and methyl 3,4,6-tri-O-galloyl-α-D-glucopyranoside (10, were synthesized for the first time in the present study. In in vitro MTT assay, 1–12 inhibited human cancer K562, HL-60 and HeLa cells with inhibition rates ranging from 64.2% to 92.9% at 100 μg/mL, and their IC50 values were determined to be varied in 17.2–124.7 μM on the tested three human cancer cell lines. In addition, compounds 1–12 inhibited murine sarcoma S180 cells with inhibition rates ranging from 38.7% to 52.8% at 100 μg/mL in the in vitro MTT assay, and in vivo antitumor activity of 1 and 2 was also detected in murine sarcoma S180 tumor-bearing Kunming mice using taxol as positive control.

  15. [Twelve years of working of Brazzaville cancer registry].

    Science.gov (United States)

    Nsondé Malanda, Judith; Nkoua Mbon, Jean Bernard; Bambara, Augustin Tozoula; Ibara, Gérard; Minga, Benoît; Nkoua Epala, Brice; Gombé Mbalawa, Charles

    2013-02-01

    The Brazzaville cancer registry was created in 1996 with the support of the International Agency Research against Cancer (IARC) which is located in Lyon, France. The Brazzaville cancer registry is a registry which is based on population which records new cancer cases occurring in Brazzaville by using Canreg 4.0 Software. Its aim is to supply useful information to fight against cancer to physicians and to decision makers. We conducted this study whose target was to determine the incidence of cancer in Brazzaville during twelve years, from January 1st, 1998 to December 31, 2009. During that period 6,048 new cancer cases were recorded: 3,377 women (55.8%), 2,384 men (39.4%), and 287 children (4.8%) from 0 to 14 years old with an annual average of 504 cases. Middle age to the patient's diagnosis was 49.5 years in female sex and 505.5 years old for male sex. The incidence rate of cancers in Brazzaville was 39.8 or 100.000 inhabitants per year and by sex we observed 49 to female sex and 35.2 for male sex. The first cancers localizations observed to women were in order of frequency: breast, cervix uterine, liver ovaries, hematopoietic system, to men : liver, prostate, hematopoietic system, colon and stomach; to children : retina, kidney, hematopoietic system, liver and bones. These rates are the basis to know the burden of cancer among all pathologies of Brazzaville and the achievement of a national cancer control program.

  16. Hyperinsulinism and hyperammonemia syndrome: report of twelve unrelated patients.

    Science.gov (United States)

    De Lonlay, P; Benelli, C; Fouque, F; Ganguly, A; Aral, B; Dionisi-Vici, C; Touati, G; Heinrichs, C; Rabier, D; Kamoun, P; Robert, J J; Stanley, C; Saudubray, J M

    2001-09-01

    Hyperinsulinism and hyperammonemia syndrome has been reported as a cause of moderately severe hyperinsulinism with diffuse involvement of the pancreas. The disorder is caused by gain of function mutations in the GLUD1 gene, resulting in a decreased inhibitory effect of guanosine triphosphate on the glutamate dehydrogenase (GDH) enzyme. Twelve unrelated patients (six males, six females) with hyperinsulinism and hyperammonemia syndrome have been investigated. The phenotypes were clinically heterogeneous, with neonatal and infancy-onset hypoglycemia and variable responsiveness to medical (diazoxide) and dietary (leucine-restricted diet) treatment. Hyperammonemia (90-200 micromol/L, normal carbamylglutamate administration. The patients had mean basal GDH activity (18.3 +/- 0.9 nmol/min/mg protein) not different from controls (17.9 +/- 1.8 nmol/min/mg protein) in cultured lymphoblasts. The sensitivity of GDH activity to inhibition by guanosine triphosphate was reduced in all patient lymphoblast cultures (IC(50), or concentrations required for 50% inhibition of GDH activity, ranging from 140 to 580 nM, compared with control IC(50) value of 83 +/- 1.0 nmol/L). The allosteric effect of ADP was within the normal range. The activating effect of leucine on GDH activity varied among the patients, with a significant decrease of sensitivity that was correlated with the negative clinical response to a leucine-restricted diet in plasma glucose levels in four patients. Molecular studies were performed in 11 patients. Heterozygous mutations were localized in the antenna region (four patients in exon 11, two patients in exon 12) as well as in the guanosine triphosphate binding site (two patients in exon 6, two patients in exon 7) of the GLUD1 gene. No mutation has been found in one patient after sequencing the exons 5-13 of the gene.

  17. Commercializing government-sponsored innovations: Twelve successful buildings case studies

    Energy Technology Data Exchange (ETDEWEB)

    Brown, M.A.; Berry, L.G.; Goel, R.K.

    1989-01-01

    This report examines the commercialization and use of R and D results funded by DOE's Office of Buildings and Community Systems (OBCS), an office that is dedicated to improving the energy efficiency of the nation's buildings. Three goals guided the research described in this report: to improve understanding of the factors that hinder or facilitate the transfer of OBCS R and D results, to determine which technology transfer strategies are most effective and under what circumstances each is appropriate, and to document the market penetration and energy savings achieved by successfully-commercialized innovations that have received OBCS support. Twelve successfully-commercialized innovations are discussed here. The methodology employed involved a review of the literature, interviews with innovation program managers and industry personnel, and data collection from secondary sources. Six generic technology transfer strategies are also described. Of these, contracting R and D to industrial partners is found to be the most commonly used strategy in our case studies. The market penetration achieved to date by the innovations studied ranges from less than 1% to 100%. For the three innovations with the highest predicted levels of energy savings (i.e., the flame retention head oil burner, low-E windows, and solid-state ballasts), combined cumulative savings by the year 2000 are likely to approach 2 quads. To date the energy savings for these three innovations have been about 0.2 quads. Our case studies illustrate the important role federal agencies can play in commercializing new technologies. 27 refs., 21 figs., 4 tabs.

  18. Feasibility of determination of low-head hydroelectric power development at existing sites. Big Blue River Co-dependent Hydroelectric Development: feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Wacker, H. Steve; Feuerberg, Stan; Lawrence, John D.; Pal, Parimal C.; Trick, Dr., William T.

    1979-03-01

    The technical, economic, environmental, safety, and financial aspects of redeveloping 7 dam sites in Nebraska for hydroelectric power generation were studied. The Big Blue River Co-dependent Hydroelectric Development was found to be a technically feasible concept, for both redevelopment and in some cases rehabilitation of seven existing sites. The proposed redevelopment project will include seven installations with a recommended nominally rated redeveloped capacity of 3920 kW ranging from 120 kW at the northernmost site in Seward County to 1500 kW at Barneston. The average annual gross generation expected from the seven redeveloped sites totals 11,555,000 kWh. It is estimated that the total cost of redevelopment of these seven sites will be $14,090,000 at 1979 price levels, providing power at an average levelized cost of about 5.3 cents per kWh based on 7% cost of money, a mid-1983 commissioning date, and allowing for funds during construction and cost escalation over a 30-year period. Rehabilitation of original installations at Crete, Dewitt, Blue Springs and Barneston is technically feasible for a total installed capacity of 1415 kW with annual average gross generation of 6,675,000 kWh. The total cost of this rehabilitation is estimated as $3,372,000 at 1979 price levels, or about 2.4 cents per kWh, levelized on a similar basis. Rehabilitation of the Barneston site alone for an installed capacity of 760 kW and annual generation of 3,581,000 kWh is both technically and economically feasible. The total estimated cost of this alternative is $668,000, providing power at a cost of about 1.9 cents per kWh at 1979 price levels. The benefit-cost ratio for Barneston rehabilitation is estimated as 1.23.

  19. The worldwide relevance of hydroelectric power; L'importanza dell'energia idroelettrica a livello mondiale

    Energy Technology Data Exchange (ETDEWEB)

    Romer, A.

    2004-07-01

    This article reviews the present status of hydroelectric power in the world, assesses its future development and the importance it will have in the future. Mainly the demographic pressure and economical development in the developing countries are going to inevitably increase the worldwide energy demand. For example, it is predicted that electric power demand will double in the next 30 years. In order to minimize the environmental impact of energy consumption increase, like, e.g., climate change induced by fossil fuel use, it is essential to make the best possible use of clean renewable energy sources such as hydroelectric power. Hydroelectric power is the clean energy source with currently the largest development potential. While the present annual world production is 2,600 TWh, the technically feasible potential of hydro power is estimated to 13,000 TWh/year with an estimated 8,000 TWh/year considered to be economically viable. Most of the almost unexploited resources are in Africa, Asia and South America. This article also points to the positive socio-economic impact of construction and operation of hydroelectric power plants in those continents. Graphics and tables give various figures on the geographic distribution of hydroelectric resources in different countries and continents.

  20. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    Energy Technology Data Exchange (ETDEWEB)

    Popa, R; Popa, B [Faculty of Power Engineering, University Politehnica of Bucharest, 313 Spl. Independentei, sect. 6, Bucharest, 060042 (Romania); Popa, F [Institute for Hydropower Studies and Design, 5-7 Vasile Lascar, sect. 2, Bucharest, 020491 (Romania); Zachia-Zlatea, D, E-mail: bogdan.popa@rosha.r [Hidroelectrica S.A., 3 Constantin Nacu, sect. 2, Bucharest, 020995 (Romania)

    2010-08-15

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  1. Analysis of environmental issues related to small-scale hydroelectric development. III. Water level fluctuation

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrand, S.G. (ed.)

    1980-10-01

    Potential environmental impacts in reservoirs and downstream river reaches below dams that may be caused by the water level fluctuation resulting from development and operation of small scale (under 25MW) hydroelectric projects are identified. The impacts discussed will be of potential concern at only those small-scale hydroelectric projects that are operated in a store and release (peaking) mode. Potential impacts on physical and chemical characteristics in reservoirs resulting from water level fluctuation include resuspension and redistribution of bank and bed sediment; leaching of soluble organic matter from sediment in the littoral zone; and changes in water quality resulting from changes in sediment and nutrient trap efficiency. Potential impacts on reservoir biota as a result of water level fluctuation include habitat destruction and the resulting partial or total loss of aquatic species; changes in habitat quality, which result in reduced standing crop and production of aquatic biota; and possible shifts in species diversity. The potential physical effects of water level fluctuation on downstream systems below dams are streambed and bank erosion and water quality problems related to resuspension and redistribution of these materials. Potential biological impacts of water level fluctuation on downstream systems below dams result from changes in current velocity, habitat reduction, and alteration in food supply. These alterations, either singly or in combination, can adversely affect aquatic populations below dams. The nature and potential significance of adverse impacts resulting from water level fluctuation are discussed. Recommendations for site-specific evaluation of water level fluctuation at small-scale hydroelectric projects are presented.

  2. Rapid green synthesis of ZnO nanoparticles using a hydroelectric cell without an electrolyte

    Science.gov (United States)

    Shah, Jyoti; Kumar Kotnala, Ravinder

    2017-09-01

    In this study, zinc oxide (ZnO) nanoparticles were synthesized using a novel environmentally friendly hydroelectric cell without an electrolyte or external current source. The hydroelectric cell comprised a nanoporous Li substituted magnesium ferrite pellet in contact with two electrodes, with zinc as the anode and silver as an inert cathode. The surface unsaturated cations and oxygen vacancies in the nanoporous ferrite dissociated water molecules into hydronium and hydroxide ions when the hydroelectric cell was dipped into deionized water. Hydroxide ions migrated toward the zinc electrode to form zinc hydroxide and the hydronium ions were evolved as H2 gas at the silver electrode. The zinc hydroxide collected as anode mud was converted into ZnO nanoparticles by heating at 250 °C. Structural analysis using Raman spectroscopy indicated the good crystallinity of the ZnO nanoparticles according to the presence of a high intensity E2-(high) mode. The nanoparticle size distribution was 5-20 nm according to high resolution transmission electron microscopy. An indirect band gap of 2.75 eV was determined based on the Tauc plot, which indicated the existence of an interstitial cation level in ZnO. Near band edge and blue emissions were detected in photoluminescence spectral studies. The blue emissions obtained from the ZnO nanoparticles could potentially have applications in blue lasers and LEDs. The ZnO nanoparticles synthesized using this method had a high dielectric constant value of 5 at a frequency of 1 MHz, which could be useful for fabricating nano-oscillators. This facile, clean, and cost-effective method obtained a significant yield of 0.017 g for ZnO nanoparticles without applying an external current source.

  3. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    Science.gov (United States)

    Popa, R.; Popa, F.; Popa, B.; Zachia-Zlatea, D.

    2010-08-01

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  4. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia.

    Science.gov (United States)

    Benchimol, Maíra; Peres, Carlos A

    2015-01-01

    Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species) responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments.

  5. Management Strategy for Hydroelectric Project Toro 2: Knowing and enhancing natural resources sustainably

    Directory of Open Access Journals (Sweden)

    José Pereira Chaves

    2014-01-01

    Full Text Available The aim of this article is to understand and sustainably enhance the biological and ecological resources of the Hydroelectric Project of Toro 2, thus; a research was carried out to inventory the presence of birds, mammals and plants, in order to know if the site qualifies as a biological tourist attraction, as well as to know the opinion of local people. It is proposed the sustainable uses of natural resources, through a strategy of use, management and conservation of the ecosystems.

  6. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    Energy Technology Data Exchange (ETDEWEB)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  7. Surface finishing in hydroelectric power plants; Veredeln von Laufrad-Oberflaechen in Wasserkraftanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Rauch, Marion

    2010-07-01

    Flow optimized high performance surfaces of the rotor disks are prerequisite to reach high conversion efficiencies in hydroelectric power plants. The surface treatment can be performed using cold metal transfer (CMT) arc welding techniques developed by Fronius International GmbH, Wels, Austria. This technique yields significantly improved results with respect to energy, time and material savings compared to MIG welding or thermal spraying. Water-contact components, sealing and sliding surfaces are cladded using high-performance stainless materials. The CMT process is mainly used by Andritz Hydro Ravensburg for cladding purposes.

  8. Legal obstacles and incentives to the development of small scale hydroelectric potential in Michigan

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The first obstacle which any developer must confront in Michigan is obtaining the authority to utilize the river bed, banks, and flowing water at a proposed dam site. This involves a determination of ownership of the stream banks and bed, and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Michigan follows the riparian theory of water law. The direct regulation; indirect regulation; public utilities regulation; financing; and taxation are discussed.

  9. A probabilistic approach to evaluate the exploitation of the geographic situation of hydroelectric plants

    Energy Technology Data Exchange (ETDEWEB)

    Sant' Anna, Leonardo A.F.P. [EPE (Brazil)], E-mail: leonardo.santanna@epe.gov.br; Sant' Anna, Annibal Parracho [Escola de Engenharia - UFF, Rua Passo da Patria, 156 bl. D sl. 309 Niteroi, RJ 24210-240 (Brazil)], E-mail: tppaps@vm.uff.br

    2008-07-15

    A procedure to evaluate efficiency in the exploitation of the geographic situation of hydroelectric plants is developed here. It is based on the probabilistic composition of criteria. A comparison of 80 plants is carried out, with volume of water flow at the location and transmission rates paid measuring the potential of the geographic situation and installed power and assured energy measuring the employment of such potential. An analysis based on a new index of quality of approximation and a new measure of importance derived from Shapley value is used to select the criteria that enter a second stage of the efficiency evaluation.

  10. A probabilistic approach to evaluate the exploitation of the geographic situation of hydroelectric plants

    Energy Technology Data Exchange (ETDEWEB)

    Sant' Anna, Leonardo A.F.P.; Sant' Anna, Annibal Parracho [Escola de Engenharia - UFF, Rua Passo da Patria, 156 bl. D sl. 309 Niteroi, RJ 24210-240 (Brazil)

    2008-07-15

    A procedure to evaluate efficiency in the exploitation of the geographic situation of hydroelectric plants is developed here. It is based on the probabilistic composition of criteria. A comparison of 80 plants is carried out, with volume of water flow at the location and transmission rates paid measuring the potential of the geographic situation and installed power and assured energy measuring the employment of such potential. An analysis based on a new index of quality of approximation and a new measure of importance derived from Shapley value is used to select the criteria that enter a second stage of the efficiency evaluation. (author)

  11. The Hydroelectric Power of Necaxa and the Mexican Light and Power Co., industrial heritage at risk

    OpenAIRE

    Guzmán, Celina Peña

    2011-01-01

    This work addresses the risks to the industrial heritage of Necaxa hydroelectric complex, built by engineer Frederick Stark Pearson, through the Mexican Light and Power Company Co., in 1903 during the Diaz period. The power plant boosted the industrialization of central Mexico in most of thelast century and led to changes in the minds of the people of the towns in the Sierra Norte of Puebla where the dam was built. After a century of electrification last October 10, 2009, the President of the...

  12. THE RELEVANCE OF PUBLIC PARTICIPATION IN SOCIAL ENVIRONMENTAL ASSESSMENT PROCEDURES: ACASE STUDY - HYDROELECTRIC TUCURUÍ

    Directory of Open Access Journals (Sweden)

    Luiz Claudio Gonçalves

    2015-03-01

    Full Text Available The process of public participation in decision-making in a national social environmental, is not properly systematized, has some shortcomings and misconceptions needing so adjustments allowing for its correct operation and application.This article, through a literature review discusses the major foundations and approaches to support effective public participation in social environmental assessment processes. Methodologically, this study was also based on a case performed in Hydroelectric Tucuruí, which made use of semi-structured interviews with technicians and staff work, aimed at collecting information about the effective participation of civil society in decision-making in various stages of this project

  13. Assessment of high-head turbomachinery for underground pumped hydroelectric storage plants

    Science.gov (United States)

    Tam, S. W.; Frigo, A. A.; Blomquist, C. A.

    Underground pumped hydroelectric storage (UPHS) plants equipped with advanced reversible pump turbines for operating heads from 500 to 1500 m are discussed in terms of cost efficiency. It is found that the use of advanced machinery shifts the minimum UPHS plant cost to the head range 1200-1500 m. The interactive effects of pump-turbine efficiencies and charge/discharge ratios are examined. It is shown that under certain conditions, a pump-turbine option with a higher charge-discharge ratio at the expense of somewhat lower operating efficiency may be desirable.

  14. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  15. Standardization of electric projects of small hydroelectric power plants; Padronizacao de projetos eletricos de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberth dos Santos

    2002-07-01

    This work presents a standardizing proposal for Electrical Projects of small hydroelectric central and it has as objective to optimize some solutions for the most cases, considering the great diversity of options. The development of the dissertation is the result of several real cases of projects of hydroelectric centrals. Besides the projects, several bibliographies about the case which is being studied were researched, taking into consideration the entire proposal presented to the respective authors and, finally, as synthesis to all observations made in that study, the presentation of an optimized solution for the job of the electrical components and a proposal for the estimate of costs of those components. The conclusions of this work present a favorable result because they offer an initial proposal for the standardizing of information considered extremely important for the carrying out of a project of hydroelectric central. (author)

  16. An Experiment in Humanistic Management within Community College District Twelve, Centralia/Olympia, Washington.

    Science.gov (United States)

    Miller, Dale A.; Hurley, John A.

    Community College District Twelve, a multi-college district serving a two-county area in southwestern Washington, has attempted to incorporate at administrative levels many of the humanistic, process-oriented principles of management discussed by Maslow and Maccoby. A concept of the ideal leadership style for District Twelve guides the selection…

  17. Project final report: Energetic planning focusing small scale hydroelectric power plants; Relatorio final. Projeto planejamento energetico com enfase em pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Yara dos Santos

    1994-12-31

    Considering the increasing need for a better utilization of the Brazilian hydric resources, a deeper analysis of small scale hydroelectric power plants has been demanding. This work presents a case study of energetic planning based upon small scale hydroelectric power plants in a district of Amazon state - North Brazil 8 refs., 11 figs., 19 tabs.

  18. Report on the renewal of the hydro-electric concessions; Rapport sur le renouvellement des concessions hydroelectriques

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-11-15

    The administrative procedures of the renewable of the hydro-electric concessions in France is a real problem, leading to too long time of the case files examination. This mission aimed to identify the technical and financial criteria on which the decision maker will base his choice to give the concessions renewal. This report exposes the evaluation and the recommendations of the mission. The first part establishes an evaluation of the situation of the hydro-electric concessions and the today renewal procedures. The second part presents a analysis of this situation and the recommendations. The last part brings the conclusions. (A.L.B.)

  19. Impact of the reservoir of Paraibuna Hydroelectric Power Plant, SP, Brazil

    Directory of Open Access Journals (Sweden)

    Suely Franco Siqueira Lima

    2010-12-01

    Full Text Available Artificial reservoirs for hydroelectric power plants cause significant environment and social changes. This paper describes the construction of a geospatial database with information on the impacts caused by the Paraibuna hydroelectric power plant since its construction. CBERS-2 and Landsat 5 and 7 images were included in the database, and then, analyzed to provide information on land cover and land use for a period of 31 years. Information provided by São Paulo Energy Company (CESP and the Paraíba do Sul Water Basin Management Association (AGEVAP was integrated into this database. Interactive database queries allow the assessment of changes in the local economy around the reservoir, changes in land cover, loss of historical and environmental assets and also the actions of the energy company to minimize the plant and reservoir impacts. This database provides information that helps analyzing the potential and limits of Paraibuna Power Plant and addresses the impacts to the natural landscape and to the social and economic resources of the affected region.

  20. Hydrologic Simulations Driven by Satellite Rainfall to Study the Hydroelectric Development Impacts on River Flow

    Directory of Open Access Journals (Sweden)

    Tuan B. Le

    2014-11-01

    Full Text Available This study assesses the impact of hydroelectric dams on the discharge and total suspended solids (TSS concentration in the Huong River basin in Vietnam. The analysis is based on hydrologic and sediment transport simulations by the Soil and Water Assessment Tool (SWAT model driven by the Tropical Rainfall Measuring Mission (TRMM 3B42V6 rainfall data, from January 2003 through December 2010. An upstream sub-basin not affected by the hydroelectric dams was used for model calibration. The calibration results indicate good agreement between simulated and observed daily data (0.67 Nash-Sutcliffe efficiency, 0.82 Pearson correlation coefficient. The calibrated model for discharge and TSS simulation is then applied on another major sub-basin and then the whole Huong River basin. The simulation results indicate that dam operation in 2010 decreased downstream discharge during the rainy season by about 35% and augmented it during the dry season by about 226%. The downstream TSS concentration has decreased due to the dam operation but the total sediment loading increased during the dry season and decreased during the rainy season. On average, the dam construction and operation affected the pattern of discharge more than that of the sediment loading. Results indicate that SWAT, driven by remotely sensed inputs, can reasonably simulate discharge and water quality in ungauged or poorly gauged river basins and can be very useful for water resources assessment and climate change impact studies in such basins.

  1. Mines as lower reservoir of an UPSH (Underground Pumping Storage Hydroelectricity): groundwater impacts and feasibility

    Science.gov (United States)

    Bodeux, Sarah; Pujades, Estanislao; Orban, Philippe; Dassargues, Alain

    2016-04-01

    The energy framework is currently characterized by an expanding use of renewable sources. However, their intermittence could not afford a stable production according to the energy demand. Pumped Storage Hydroelectricity (PSH) is an efficient possibility to store and release electricity according to the demand needs. Because of the topographic and environmental constraints of classical PSH, new potential suitable sites are rare in countries whose topography is weak or with a high population density. Nevertheless, an innovative alternative is to construct Underground Pumped Storage Hydroelectricity (UPSH) plants by using old underground mine works as lower reservoir. In that configuration, large amount of pumped or injected water in the underground cavities would impact the groundwater system. A representative UPSH facility is used to numerically determine the interactions with surrounding aquifers Different scenarios with varying parameters (hydrogeological and lower reservoir characteristics, boundaries conditions and pumping/injection time-sequence) are computed. Analysis of the computed piezometric heads around the reservoir allows assessing the magnitude of aquifer response and the required time to achieve a mean pseudo-steady state under cyclic solicitations. The efficiency of the plant is also evaluated taking the leakage into the cavity into account. Combining these two outcomes, some criterions are identified to assess the feasibility of this type of projects within potential old mine sites from a hydrogeological point of view.

  2. Enhanced greenhouse gas emission from exposed sediments along a hydroelectric reservoir during an extreme drought event

    Science.gov (United States)

    Jin, Hyojin; Yoon, Tae Kyung; Lee, Seung-Hoon; Kang, Hojeong; Im, Jungho; Park, Ji-Hyung

    2016-12-01

    An active debate has been underway on the magnitude and duration of carbon (C) emissions from hydroelectric reservoirs, yet little attention has been paid to stochastic C emissions from reservoir sediments during extreme climatic events. A rare opportunity for field measurements of CO2 efflux from a hydroelectric reservoir in Korea during an extreme drought event was used to examine how prolonged droughts can affect microbial organic matter processing and the release of CO2, CH4 and N2O from exposed sediments. Chamber measurements of CO2 efflux along an exposed sediment transect, combined with high-frequency continuous sensor measurements of the partial pressure of CO2 (pCO2) in the reservoir surface water, exhibited extraordinary pulses of CO2 from exposed sediments and the turbulent inflowing water in contrast to a small CO2 sink in the main water body of the reservoir and a low efflux of CO2 from the flooded sediment. Significant increases in the production of CO2, CH4 and N2O observed in a laboratory incubation of sediments, together with enhanced activities of phenol oxidase and three hydrolases, indicate a temporary activation of microbial organic matter processing in the drying sediment. The results suggest that drought-triggered pulses of greenhouse gas emission from exposed sediments can offset the C accumulation in reservoir sediments over time scales of years to decades, reversing the trend of declining C emissions from aging reservoirs.

  3. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 2. Pacific Southwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental, and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Pacific Southwest region, the maximum physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy greater than 85,000 GWH. By comparison, these values represent about 6% of the total potential capacity and hydroelectric energy generation estimated for the entire US. Of the total capacity estimated for the region, 9900 MW has been installed. The remainder (23,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (6000 MW) and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (17,200 MW). Small-scale facilities account for less than 4% of the region's total installed capacity, but another 600 MW could be added to these and other small water resource projects. In addition, 600 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of California and Utah having the largest potential for incremental development at existing projects in the Pacific Southwest region. States comprising the Southwest are Arizona, California, Hawaii, Nevada, and Utah.

  4. Drought Impacts on Reservoir Storage and Hydro-electricity Production in Southeastern Brazil

    Science.gov (United States)

    Scanlon, B. R.; Melo, D. D.; Yin, L.; Wendland, E.

    2015-12-01

    Brazilian hydroelectric plants (HP) generate ~85% of the total electricity in the country (138 GW). More than half of the number largest reservoirs are located in the Southeast/Midwest region, where ~50% of the population (~100 million) lives. The 2014 drought raised several questions about the resilience of the water sources when several urban centers, including Brazilian's largest metropolis (São Paulo, 20 million people), had their water supply threatened. Such drought also affected reservoirs of hydroelectric plants. This study assesses how the storage and, thus the electricity generation, in 14 of the largest reservoirs were affected by drought events within the past 20 years. We computed the Standardized Precipitation Index (SPI) to identify rainfall anomalies throughout the analyzed period. To evaluate the impacts on surface water, we assessed the changes in total (surface+ subsurface) runoff and soil moisture from Global Land Data Assimilation System (GLDAS) and in Total Water Storage (TWS) from Gravity Recovery and Climate Experiment (GRACE) satellite data. We evaluated the anomalies and significance of the changes in reservoir storage (RS) and electricity generation. The results show that severe dry years (-1.5 enhance drought resilience in the future.

  5. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 6. Northeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Northeast region, the physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy of some 153,000 GWH. By comparison, the available data represent about 6% of the total capacity and 11% of the hydroelectric energy potential estimated for the entire US. Of the total capacity estimated for the region, 6100 MW has been installed. The remainder (27,200 MW, excluding the undeveloped capacity in the New England States) is the maximum which could be developed by upgrading and expanding existing projects (18,700 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (8500 MW). Small-scale facilities account for about 15% of the region's total installed capacity, but another 1800 MW could be added to these and other small water-resource projects. In addition, 500 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of New York, Maine, and New Hampshire having the largest potential for incremental development at existing projects in the Northeast region. West Virginia, Maryland, Delaware, New Jersey, Pennsylvania, New York, Connecticut, Massachusetts, Rhode Island, New Hampshire, Vermont, and Maine comprise the Northeast region.

  6. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 5. Southeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Southeast region, the maximum physical potential for all sites exceeds 48,000 MW with an estimated average annual energy of more than 137,000 GWH. By comparison, these values represent about 9% of both the total potential capacity and hydroelectric energy estimated for the entire US. Of the total capacity estimated for the region, 11,800 MW has been installed. The remainder (36,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (13,000 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (23,200 MW). Small-scale facilities account for some 2% of the region's total installed capacity, but another 700 MW could be added to these and other small water-resource projects. In addition, 1100 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of North Carolina and South Carolina having the largest potential for incremental development at existing projects in the Southeast region. The Southeast region is composed of Arkansas, Louisiana, Mississippi, Tennessee, Alabama, Georgia, Florida, South Carolina, North Carolina, and Virginia.

  7. Legal obstacles and incentives to the development of small scale hydroelectric power in Delaware

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Delaware, a watercourse is not to be confused with surface water. Each gives rise to certain riparian rights, but the law makes certain distinctions between the two. The presence of both surface waters and watercourses give rise to private and public rights related to the presence of the water. Some of these rights are vested in riparian owners. Recent Delaware case law has described the riparian owner as one who owns land on the bank of a river, or who is owner of land along, bordering upon, bounded by, fronting upon, abutting, or adjacent and contiguous to and in contact with a river. But, ownership of the bank does not give the riparian ownership of the water. Some law cases are cited to discuss the laws in Delaware.

  8. Legal obstacles and incentives to the development of small scale hydroelectric power in Maryland

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maryland are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined with the aim of creating a more orderly understanding of the vagaries of the system, focusing on the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. In Maryland, by common law rule, title to all navigable waters and to the soil below the high-water mark of those waters is vested in the state as successor to the Lord Proprietary who had received it by grant from the Crown. Rights to non-navigable water, public trust doctrine, and eminent domain are also discussed. Direct and indirect regulations, continuing obligations, loan programs, and regional organizations are described in additional sections.

  9. A model for the data extrapolation of greenhouse gas emissions in the Brazilian hydroelectric system

    Science.gov (United States)

    Pinguelli Rosa, Luiz; Aurélio dos Santos, Marco; Gesteira, Claudio; Elias Xavier, Adilson

    2016-06-01

    Hydropower reservoirs are artificial water systems and comprise a small proportion of the Earth’s continental territory. However, they play an important role in the aquatic biogeochemistry and may affect the environment negatively. Since the 90s, as a result of research on organic matter decay in manmade flooded areas, some reports have associated greenhouse gas emissions with dam construction. Pioneering work carried out in the early period challenged the view that hydroelectric plants generate completely clean energy. Those estimates suggested that GHG emissions into the atmosphere from some hydroelectric dams may be significant when measured per unit of energy generated and should be compared to GHG emissions from fossil fuels used for power generation. The contribution to global warming of greenhouse gases emitted by hydropower reservoirs is currently the subject of various international discussions and debates. One of the most controversial issues is the extrapolation of data from different sites. In this study, the extrapolation from a site sample where measurements were made to the complete set of 251 reservoirs in Brazil, comprising a total flooded area of 32 485 square kilometers, was derived from the theory of self-organized criticality. We employed a power law for its statistical representation. The present article reviews the data generated at that time in order to demonstrate how, with the help of mathematical tools, we can extrapolate values from one reservoir to another without compromising the reliability of the results.

  10. Influence of the Amazon Hydrological Regime on Eutrophication Indicators of a Hydroelectric Power Plant Reservoir.

    Science.gov (United States)

    Freire, Jean Carlos A; Hauser-Davis, Rachel Ann; da Costa Lobato, Tarcísio; de Morais, Jefferson M; de Oliveira, Terezinha F; F Saraiva, Augusto Cesar

    2017-05-01

    Dam constructions in the Amazon have increased exponentially in the last decades, causing several environmental impacts and serious anthropogenic impacts in certain hydroelectric power plant reservoirs in the region have been identified. The assessment of the trophic status of these reservoirs is of interest to indicate man-made changes in the environment, but must take into account the hydrological cycle of the area. This can be relevant for environmental management actions, aiding in the identification of the ecological status of water bodies. In this context, physico-chemical parameters and eutrophication indicators were determined in a hydroelectric power plant reservoir in the Brazilian Amazon to assess trophic variations during the regional hydrological regime phases on the reservoir, namely dry, filling, full and emptying stages. The local hydrological regimes were shown to significantly influence TSS and turbidity, as well as NH4, NO3, PO4, with higher values consistently observed during the filling stage of the reservoir. In addition, differences among the sampling stations regarding land use, population and anthropogenic activities were reflected in the PO4(3-) values during the different hydrological phases.

  11. The development of advanced hydroelectric turbines to improve fish passage survival

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2001-09-01

    Recent efforts to improve the survival of hydroelectric turbine-passed juvenile fish have explored modifications to both operation and design of the turbines. Much of this research is being carried out by power producers in the Columbia River basin (U.S. Army Corps of Engineers and the public utility districts), while the development of low impact turbines is being pursued on a national scale by the U.S. Department of Energy. Fisheries managers are involved in all aspects of these efforts. Advanced versions of conventional Kaplan turbines are being installed and tested in the Columbia River basin, and a pilot scale version of a novel turbine concept is undergoing laboratory testing. Field studies in the last few years have shown that improvements in the design of conventional turbines have increased the survival of juvenile fish. There is still much to be learned about the causes and extent of injuries in the turbine system (including the draft tube and tailrace), as well as the significance of indirect mortality and the effects of turbine passage on adult fish. However, improvements in turbine design and operation, as well as new field, laboratory, and modeling techniques to assess turbine-passage survival, are contributing toward resolution of the downstream fish passage issue at hydroelectric power plants.

  12. University-Company Cooperation in a Hydroelectric Plant: Cooperation Study in Environmental Management

    Directory of Open Access Journals (Sweden)

    Fabricio Mussi

    2017-05-01

    Full Text Available Hydroelectric power plants are considered strategic for the country when considering their relevance and impact on other sectors of the economy. However, the dynamics of the operation of a plant, its support structure and power generation activities can cause impacts on the environment, which must be constantly monitored in order to mitigate any environmental risks. The purpose of this study is to examine the partnership relations between a plant by menas of the creation of a department within the environmental management and universities and research institutes to identify specific partnerships in environmental management and hydroelectric plants. Six projects have been selected for analysis, four of them related to projects with universities and two related to cooperation with research institutes. The focus of the analysis was restricted to the main points observed in the management of these partnerships, which are: (a motivation for establishing partnerships, (b the composition of the estimated costs for implementing these partnerships, (c the difficulties of reconciling technical management and financial management, and (d the measurement of results and contributions from these interactions. Administrative practices of management of partnerships were also analyzed in the stages preceding cooperation for cooperation and further cooperation. Although other such studies are needed to strengthen the findings presented, one can conclude that the purposes of the establishment of cooperation in environmental management differ from those observed in other fields of knowledge such as engineering and biotechnology, for example.

  13. Fish mercury increase in Lago Manso, a new hydroelectric reservoir in tropical Brazil.

    Science.gov (United States)

    Hylander, Lars D; Gröhn, Janina; Tropp, Magdalena; Vikström, Anna; Wolpher, Henriette; de Castro E Silva, Edinaldo; Meili, Markus; Oliveira, Lázaro J

    2006-10-01

    It has been frequently demonstrated that mercury (Hg) concentrations in fish rise in newly constructed hydroelectric reservoirs in the Northern Hemisphere. In the present work, we studied whether similar effects take place also in a tropical upland reservoir during impoundment and discuss possible causes and implications. Total Hg concentrations in fish and several soil and water parameters were determined before and after flooding at Rio Manso hydroelectric power plant in western Brazil. The Hg concentrations in soil and sediment were within the background levels in the region (22-35 ng g(-1) dry weight). There was a strong positive correlation between Hg and carbon and sulphur in sediment. Predatory fish had total Hg concentrations ranging between 70 and 210 ng g(-1) f.w. 7 years before flooding and between 72 and 755 ng g(-1) f.w. during flooding, but increased to between 216 and 938 ng g(-1) f.w. in the piscivorous and carnivorous species Pseudoplatystoma fasciatum, cachara, and Salminus brasiliensis, dourado, 3 years after flooding. At the same time, concentrations of organic carbon in the water increased and oxygen concentrations decreased, indicating increased decomposition and anoxia as contributing to the increased Hg concentrations in fish. The present fish Hg concentrations in commonly consumed piscivorous species are a threat to the health of the population dependent on fishing in the dam and downstream river for sustenance. Mercury exposure can be reduced by following fish consumption recommendations until fish Hg concentrations decrease to a safe level.

  14. Open system architecture for condition based maintenance applied to a hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Amaya, E.J.; Alvares, A.J. [University of Brasilia (UnB), DF (Brazil). Mechanical and Mechatronic Dept.], Emails: eamaya@unb.br, alvares@AlvaresTech.com; Gudwin, R.R. [State University of Campinas (UNICAMP), SP (Brazil). Computer Engineering and Industrial Automation Dept.], E-mail: gudwin@dca.fee.unicamp.br

    2009-07-01

    The hydroelectric power plant of Balbina is implementing a condition based maintenance system applying an open, modular and scalable integrated architecture to provide comprehensive solutions and support to the end users like operational and maintenance team. The system called SIMPREBAL (Predictive Maintenance System of Balbina) is advocate of open standards, in particular through collaborative research programmers. In the developing is clearly understands the need for both, industry standards and a simple to use software development tool chain, supporting the development of complex condition based maintenance systems with multiple partners. The Open System Architecture for Condition Based Maintenance (OSA-CBM) is a standard that consider seven hierarchic layers that represent a logic transition or performed data flow from the data acquisition layer, through the intermediates layers as signal processing, condition monitor, health assessment, prognostics and decision support, to arrive to the presentation layer. SIMPREBAL is being implementing as an OSA-CBM software framework and tool set that allows the creation of truly integrated, comprehensive maintenance solutions through the internet. This paper identifies specific benefits of the application of the OSA-CBM in comprehensive solutions of condition based maintenance for a hydroelectric power plant. (author)

  15. Tazimina Hydroelectric Project, Iliamna, Alaska Final Technical and Construction Cost Report

    Energy Technology Data Exchange (ETDEWEB)

    HDR Alaska, Inc.

    1998-11-01

    The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. These communities have a combined population of approximately 600 residents. There is no direct road connection from these villages to larger population centers. Electric power has been generated by INNEC since 1983 using diesel generators located in the community of Newhalen. Fuel for these generators was transported up the Kvichak River, an important salmon river, and across Iliamna Lake. In dry years the river is low and fuel is flown into Iliamna and then trucked five miles into Newhalen. The cost, difficult logistics and potential spill hazard of this fuel was a primary reason for development of hydroelectric power in this area. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

  16. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 4. Lake Central region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Lake Central region, the maximum physical potential for all sites exceeds 26,000 MW with an estimated average annual energy of more than 75,000 GWH. By comparison, these values represent about 5% of both the total potential capacity and hydroelectric energy estimated for the entire US. Of the total capacity estimated for the region, 2600 MW has been installed. The remainder (23,600 MW) is the maximum which could be developed by upgrading and expanding existing projects (15,800 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (7800 MW). Small-scale facilities account for some 24% of the region's total installed capacity, but another 900 MW could be added to these and other small water-resource projects. In addition, 900 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of Michigan and Wisconsin having the largest potential for incremental development at existing projects in the Lake Central region. This Lake Central region is composed of Minnesota, Wisconsin, Michigan, Ohio, Indiana, Illinois, Kentucky, Missouri, and Iowa.

  17. The impact of alcoholics anonymous on other substance abuse-related twelve-step programs.

    Science.gov (United States)

    Laudet, Alexandre B

    2008-01-01

    This chapter explores the influence of the AA model on self-help fellowships addressing problems of drug dependence. Fellowships that have adapted the twelve-step recovery model to other substances of abuse are reviewed; next similarities and differences between AA and drug-recovery twelve-step organizations are examined; finally, we present empirical findings on patterns of attendance and perceptions of AA and Narcotics Anonymous (NA) among polydrug-dependent populations, many of whom are cross-addicted to alcohol. Future directions in twelve-step research are noted in closing.

  18. 25 YEARS EXPERIENCES OF CHINA MADE SMALL HYDROELECTRIC UNITS WITH USA MADE DIGITAL TECHNOLOGY INSTALLED IN USA AND CENTRAL AMERICA

    Institute of Scientific and Technical Information of China (English)

    DR.ALEXANDERA

    2005-01-01

    Twenty-five years ago America's small hydroelectric power generations were reactivated by private, municipal, and local governments to utilize the renewable energy from the small hydro sties available 10,000 existing dams, small rivers and/or streams, and energy recovery facilities at many water transmission and delivery systems.

  19. The hydroelectric power plant as a project of private investment; La central hidroelectrica como proyecto de inversion privada

    Energy Technology Data Exchange (ETDEWEB)

    Guerra, Eduardo [Industrias Metalurgicas Pescarmona S.A. (IMPSA), Mendoza (Argentina)]. E-mail: guerra@impsa.com.ar

    2001-07-01

    The paper describes the process to be followed for the performance, construction and operation of a hydroelectric investment from the view point of a private investor. The paper demonstrates that it is possible to finance the project through the 'project finance', where the finance has as guarantee the own assets and the fund fluxes of the investment.

  20. Changes in soil organic matter compositrion after introduction of riparian vegetation on shores of hydroelectric reservoires (Southeast of Brazil)

    NARCIS (Netherlands)

    Alcantara, de F.A.; Buurman, P.; Curi, N.; Furtini Neto, A.E.; Lagen, van B.; Meijer, E.M.

    2004-01-01

    This work is part of a research program with the general objective of evaluating soil sustainability in areas surrounding hydroelectric reservoirs, which have been planted with riparian forest. The specific aims were: (i) to assess if and how the soil organic matter (SOM) chemical composition has ch

  1. 75 FR 75999 - Lock + Hydro Friends Fund XlVI; FFP Missouri 17, LLC; Solia 3 Hydroelectric, LLC; Three Rivers...

    Science.gov (United States)

    2010-12-07

    ... 3 Hydroelectric, LLC; Three Rivers Hydro, LLC; Hildebrand Hydro, LLC; Notice of Competing..., and Three Rivers Hydro LLC, and on May 19 Hildebrand Hydro, filed applications, pursuant to section 4... of Engineers (Corps) Hildebrand Lock & Dam located on the Monongahela River in Monongahela...

  2. Accumulated effects on landscape pattern by hydroelectric cascade exploitation in the Yellow River basin from 1977 to 2006

    NARCIS (Netherlands)

    Ouyang, W.; Skidmore, A.K.; Hao, F.H.; Toxopeus, A.G.; Abkar, A.

    2009-01-01

    The accumulated impacts of hydroelectric cascade exploitation (HCE) on the landscape are greater than the simple sum of the impacts from a single dam. The spatial–temporal landscape characteristics resulting from the accumulated impacts of HCE from 1977 to 2006 in Longliu Watershed, a part of the Ye

  3. Simulation of the transient processes of load rejection under different accident conditions in a hydroelectric generating set

    Science.gov (United States)

    Guo, W. C.; Yang, J. D.; Chen, J. P.; Peng, Z. Y.; Zhang, Y.; Chen, C. C.

    2016-11-01

    Load rejection test is one of the essential tests that carried out before the hydroelectric generating set is put into operation formally. The test aims at inspecting the rationality of the design of the water diversion and power generation system of hydropower station, reliability of the equipment of generating set and the dynamic characteristics of hydroturbine governing system. Proceeding from different accident conditions of hydroelectric generating set, this paper presents the transient processes of load rejection corresponding to different accident conditions, and elaborates the characteristics of different types of load rejection. Then the numerical simulation method of different types of load rejection is established. An engineering project is calculated to verify the validity of the method. Finally, based on the numerical simulation results, the relationship among the different types of load rejection and their functions on the design of hydropower station and the operation of load rejection test are pointed out. The results indicate that: The load rejection caused by the accident within the hydroelectric generating set is realized by emergency distributing valve, and it is the basis of the optimization for the closing law of guide vane and the calculation of regulation and guarantee. The load rejection caused by the accident outside the hydroelectric generating set is realized by the governor. It is the most efficient measure to inspect the dynamic characteristics of hydro-turbine governing system, and its closure rate of guide vane set in the governor depends on the optimization result in the former type load rejection.

  4. Accumulated effects on landscape pattern by hydroelectric cascade exploitation in the Yellow River basin from 1977 to 2006

    NARCIS (Netherlands)

    Ouyang, W.; Skidmore, A.K.; Hao, F.H.; Toxopeus, A.G.; Abkar, A.

    2009-01-01

    The accumulated impacts of hydroelectric cascade exploitation (HCE) on the landscape are greater than the simple sum of the impacts from a single dam. The spatial–temporal landscape characteristics resulting from the accumulated impacts of HCE from 1977 to 2006 in Longliu Watershed, a part of the

  5. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development II: Design Consideration for Passing Fish Upstream Around Dams

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrandt, S. G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bell, M. C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Anderson, J. J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Richey, E. P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Parkhurst, Z. E. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1980-08-01

    The purpose of this report is to provide general information for use by potential developers of small scale hydroelectric projects that will include facilities to pass migrating fish upstream around dams. The document is not intended to be a textbook on design of fish passage facilities, but rather to be a general guide to some factors that are important when designing such facilities.

  6. CLINICAL APPLICATION OF “TWELVE WELL-POINTS” IN EMERGENCY TREATMENT

    Institute of Scientific and Technical Information of China (English)

    段功保

    2000-01-01

    In many years' clinical practice, I used blood-letting method of “Twelve Well-points” to treat emergencies as coma, syncope, acute infantile convulsion, wind-stroke syndrome, hysteria, epilepsy, etc. and have achieved immediate results.

  7. Ticks (Acari: Ixodidae on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil

    Directory of Open Access Journals (Sweden)

    Marcelo B Labruna

    2002-12-01

    Full Text Available From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paraná river, between the states of São Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species, Boophilus (1 and Anocentor (1. A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  8. Diversity and activity pattern of wildlife inhabiting catchment of Hulu Terengganu Hydroelectric Dam, Terengganu, Peninsular Malaysia

    Science.gov (United States)

    Adyla, M. N. Nurul; Ikhwan, Z.; Zuhairi, M.; Ngah, Shukor, M. N.

    2016-11-01

    A series of camera trapping surveys were conducted to study the diversity and distribution of wildlife within the catchment of Hulu Terengganu Hydroelectric Dam. A total of 124 camera traps were deployed at nine study sites, continuously from June 2014 until December 2015. The total effort of camera trap surveys from all the study sites during the 18-month sampling period was 29,128 night traps, from which a total of 32 species of wildlife representing nine Orders were recorded. The most common species were Eurasian Wild Pig (Sus scrofa), Barking Deer (Munticus muntjak), and Malayan Tapir (Tapirus indicus). Camera trap data on activity patterns show that Gallus gallus, Muntiacus muntjak and Sus scrofa are diurnal animals, whereas Tapirus indicus, Elephas maximus and Helarctos malayanus are nocturnal animals.

  9. STUDY OF ECONOMIC AND FINANCIAL VIABILITY OF A CENTRAL GENERATING HYDROELECTRIC (CGH

    Directory of Open Access Journals (Sweden)

    Bruno Santos Lopes Candido

    2012-11-01

    Full Text Available The article discusses the evaluation of a Central Hydroelectric Generator (CGH, as an investment. The objective is to project the cash flow of the project and evaluate outcomes to ensure important information for decision-making through technical analysis of investment projects. The work begins with literature on the subject and subsequent case study. To develop this study was carried out data collection on construction and identification of key variables related to energy market in Brazil. Later techniques were used for evaluating investment projects, regarding their financial feasibility. An interview with a business sector, and research and consulting firms. The result was positive and showed that the project is a viable investment thus adding value to shareholders compared to other investment alternatives in the financial market.

  10. Do Hydroelectric Dams Mitigate Global Warming? The Case of Brazil's Curuna Dam

    Energy Technology Data Exchange (ETDEWEB)

    Fearnside, P.M. [National Institute for Research in the Amazon (INPA), C.P. 478, 69011-970 Manaus, Amazonas (Brazil)

    2005-10-15

    Hydroelectric dams in tropical forest areas emit greenhouse gases, as illustrated by the Curuna dam in the Amazonian portion of Brazil. Emissions include carbon dioxide from decay of the above-water portions of trees that are left standing in the reservoir and methane from soft vegetation that decays under anaerobic conditions on the bottom of the reservoir, especially macrophytes (water weeds) and vegetation that grows in the drawdown zone and is flooded when the reservoir water level rises. Some methane is released from the reservoir surface through bubbling and diffusion, but larger amounts are released from water passing through the turbines and spillway. Methane concentration in the water increases with depth, and the turbines and spillway draw water from sufficient depth to have substantial methane content. In 1990 (13 years after filling), the Curuna Dam emitted 3.6 times more greenhouse gases than would have been emitted by generating the same amount of electricity from oil.

  11. Legal obstacles and incentives to the development of small scale hydroelectric power in Vermont

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Vermont are discussed. The dual regulatory system involving state and Federal governments is discussed followed by discussions on property interests; direct regulation by the Public Service Board; indirect regulation; and financial considerations. An initial step required of any developer is that of real property acquisition. Ordinarily this involves acquiring the stream bed, land along the stream banks, and land needed for the impoundment reservoir. Ownership of land along the stream banks places the developer in the position of a riparian owner. This status is important in that only riparian owners are entitled to a reasonable use of the flowing water. In addition to acquisition by sale, lease, or gift, Vermont law allows certain developers to acquire property via eminent domain. Some general rules which have evolved as riparian law and applied in Vermont are discussed.

  12. Multi-Model Long-Range Ensemble Forecast for Decision Support in Hydroelectric Operations

    Science.gov (United States)

    Kunkel, M. L.; Parkinson, S.; Blestrud, D.; Holbrook, V. P.

    2014-12-01

    Idaho Power Company (IPC) is a hydroelectric based utility serving over a million customers in southern Idaho and eastern Oregon. Hydropower makes up ~50% of our power generation and accurate predictions of streamflow and precipitation drive our long-term planning and decision support for operations. We investigate the use of a multi-model ensemble approach for mid and long-range streamflow and precipitation forecasts throughout the Snake River Basin. Forecast are prepared using an Idaho Power developed ensemble forecasting technique for 89 locations throughout the Snake River Basin for periods of 3 to 18 months in advance. A series of multivariable linear regression, multivariable non-linear regression and multivariable Kalman filter techniques are combined in an ensemble forecast based upon two data types, historical data (streamflow, precipitation, climate indices [i.e. PDO, ENSO, AO, etc…]) and single value decomposition derived values based upon atmospheric heights and sea surface temperatures.

  13. Watermill and Small-Scale Hydroelectric Power Plant Landscapes Assessed According to Ecological Aspects

    Directory of Open Access Journals (Sweden)

    Lilita Lazdāne

    2013-10-01

    Full Text Available Research of watermill and small-scale hydroelectric power plant (HPP landscapes in Latvia according to ecological aspects is a part of a more complex research. The aim of this research is to examine the existing situation of watermill and small-scale HPP landscapes in Latvia by applying the ecological assessment criteria, and then try to formulate a definition of common tendencies of the landscape character. This paper provides a landscape inventory matrix for research in the field stu­dies of landscape identification at the local planning level. The duration of the research was from 2010 to 2012. The research includes 42 territories starting with the three most densely developed areas in Latvia: in Latgale, Kurzeme and Vidzeme uplands distribution ranges. The research results reflect tendencies of the landscape features assessed according to the previously developed criteria of ecological aspects.

  14. Dynamic simulation and optimization approach to construction diversion of hydraulic and hydroelectric projects

    Institute of Scientific and Technical Information of China (English)

    ZHONG DengHua; LI MingChao; HUANG Wei; LIU Yong

    2009-01-01

    To solve the engineering and scientific problems in construction diversion and its simulation analysis,a complete scheme is presented. Firstly, the complex constraint relationship was analyzed among main buildings, diversion buildings and flow control. Secondly, the time-space relationship model of construction diversion system and the general block diagram-oriented simulation model of diversion process were set up. Then, the corresponding numerical simulation method and 3D dynamic visual simulation method were put forward. Further, the simulation and optimization platform of construction diversion control process was developed, integrated with simulation modeling, computation and visualization. Finally, these methods were applied to a practical project successfully, showing that the modeling process is convenient, the computation and the visual analysis can be coupled effectively,and the results conform to practical state. They provide new theoretical principles and technical measures for analyzing the control problems encountered in construction diversion of hydraulic and hydroelectric engineering under complex conditions.

  15. Dynamic simulation and optimization approach to construction diversion of hydraulic and hydroelectric projects

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    To solve the engineering and scientific problems in construction diversion and its simulation analysis, a complete scheme is presented. Firstly, the complex constraint relationship was analyzed among main buildings, diversion buildings and flow control. Secondly, the time-space relationship model of construction diversion system and the general block diagram-oriented simulation model of diversion process were set up. Then, the corresponding numerical simulation method and 3D dynamic visual simulation method were put forward. Further, the simulation and optimization platform of construction diversion control process was developed, integrated with simulation modeling, computation and visualization. Finally, these methods were applied to a practical project successfully, showing that the modeling process is convenient, the computation and the visual analysis can be coupled effectively, and the results conform to practical state. They provide new theoretical principles and technical measures for analyzing the control problems encountered in construction diversion of hydraulic and hydroelectric engineering under complex conditions.

  16. Ticks (Acari: Ixodidae) on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil.

    Science.gov (United States)

    Labruna, Marcelo B; de Paula, Cátia D; Lima, Thiago F; Sana, Dênis A

    2002-12-01

    From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paran river, between the states of S o Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species), Boophilus (1) and Anocentor (1). A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages) collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  17. Maintenance and operation of a hydroelectric unit of energy in a power system using virtual reality

    Energy Technology Data Exchange (ETDEWEB)

    de Sousa, Marcos Paulo Alves [Federal University of Para, Faculty of Engineering Computing, Augusto Correa Street, No. 1, Belem, Para (Brazil); Emilio Goeldi Museum, Service Data Processing Department, Perimetral Avenue No. 1901, Belem, Para (Brazil); Filho, Manoel Ribeiro; Nunes, Marcus Vinicius Alves; Lopes, Andrey da Costa [Federal University of Para, Faculty of Engineering Computing, Augusto Correa Street, No. 1, Belem, Para (Brazil)

    2010-07-15

    This paper presents a new approach to training for hydroelectric unit of energy (HUE) by using virtual reality Non-immersive techniques. The software offers two modules of training: maintenance and operation. The first module, maintenance, uses the learning approach based on practice and offers different training levels, divided into three modes: automatic, guided, and exploratory, in which these modes are accessed according to the acquired degree of knowledge by the trainee in relation to maintenance procedures. The second module, allows the trainee to visualize the operation of HUE during a certain event as the electromechanical dynamics of the turbine-generator assemblage in the virtual world by the visualization of several requisite conditions before the startup-shutdown procedure of HUE. (author)

  18. Socio-economic and Environmental Implications of the Hydroelectric Projects in Uttarakhand Himalaya, India

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    This paper deals with detailed analysis of the fiasco created by the Tehri High Dam in Uttarakhand, India, particularly in terms of resettlement and rehabilitation of the local inhabitants. Aspects pertaining to the environmental issues are also discussed. Currently, the river valleys in Uttarakhand state of India are the targets of increasing hydroelectric projects. Virtually all rivers are being exploited for generating environmental friendly power. Having being learned the hard lesson from Tehri Dam, it has been decided to opt for suchschemes in which comparatively little submergenceand tempering with the fragile eco-systems is involved.However, our observations suggest that even in such schemes if due care is not taken they may turn out to be a failure.

  19. A holistic approach towards optimal planning of hybrid renewable energy systems: Combining hydroelectric and wind energy

    Science.gov (United States)

    Dimas, Panagiotis; Bouziotas, Dimitris; Efstratiadis, Andreas; Koutsoyiannis, Demetris

    2014-05-01

    Hydropower with pumped storage is a proven technology with very high efficiency that offers a unique large-scale energy buffer. Energy storage is employed by pumping water upstream to take advantage of the excess of produced energy (e.g. during night) and next retrieving this water to generate hydro-power during demand peaks. Excess energy occurs due to other renewables (wind, solar) whose power fluctuates in an uncontrollable manner. By integrating these with hydroelectric plants with pumped storage facilities we can form autonomous hybrid renewable energy systems. The optimal planning and management thereof requires a holistic approach, where uncertainty is properly represented. In this context, a novel framework is proposed, based on stochastic simulation and optimization. This is tested in an existing hydrosystem of Greece, considering its combined operation with a hypothetical wind power system, for which we seek the optimal design to ensure the most beneficial performance of the overall scheme.

  20. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1995 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martinson, Rick D.; Graves, Richie J.; Langeslay, Michael J. (Northwest and Alaska Fisheries Science Center, Environmental and Technical Services Division, Portland, OR)

    1996-12-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia river in 1995. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program focuses on protecting, mitigating, and enhancing fish populations affected by the development and operation of hydroelectric power plants on the Columbia River. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide FPC with species and project specific real time data from John Day and Bonneville Dams.

  1. Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.

  2. Performance of distributing valves in hydroelectric speed governors: analysis of the influence of the internal geometry

    Energy Technology Data Exchange (ETDEWEB)

    Retzlaff, L.; Pacheco, M.I.; Ferronatto, D.; Negri, V.J. de [Federal University of Santa Catarina (LASHIP/EMC/UFSC), Florianopolis, SC (Brazil). Mechanical Engineering Dept. Lab. of Hydraulic and Pneumatic Systems], E-mail: victor@emc.ufsc.br; Belan, H.C. [Federal Institute of Santa Catarina (IFSC), Chapeco, SC (Brazil). Mechanical Engineering Dept.; Soares, J.M.C. [REIVAX Automacao e Controle, Florianopolis, SC (Brazil)

    2009-07-01

    This paper discusses an analysis of the influence of internal geometric parameters on the performance of distributing valves including the theoretical and experimental analysis of a 3000 Lpm valve which is used in the speed control of a 350 MVA turbine. Using a model that represents the fluid flow through the valve, it is possible to study the influence of the internal geometry, such the orifice area, radial clearances and internal channels, on the behavior of flow rate and pressure. With the validated model, different valve configurations can be evaluated either in the design phase or during the operation and qualification tests. These results could aid both professionals involved in the operation and maintenance of hydroelectric power plants in identifying and tracking any changes in the valves performance and design engineers in the definition of the geometric and dimensional tolerances. (author)

  3. Integration of Lithium-Ion Battery Storage Systems in Hydroelectric Plants for Supplying Primary Control Reserve

    Directory of Open Access Journals (Sweden)

    Fabio Bignucolo

    2017-01-01

    Full Text Available The ever-growing diffusion of renewables as electrical generation sources is forcing the electrical power system to face new and challenging regulation problems to preserve grid stability. Among these, the primary control reserve is reckoned to be one of the most important issues, since the introduction of generators based on renewable energies and interconnected through static converters, if relieved from the primary reserve contribution, reduces both the system inertia and the available power reserve in case of network events involving frequency perturbations. In this scenario, renewable plants such as hydroelectric run-of-river generators could be required to provide the primary control reserve ancillary service. In this paper, the integration between a multi-unit run-of-river power plant and a lithium-ion based battery storage system is investigated, suitably accounting for the ancillary service characteristics as required by present grid codes. The storage system is studied in terms of maximum economic profitability, taking into account its operating constraints. Dynamic simulations are carried out within the DIgSILENT PowerFactory 2016 software environment in order to analyse the plant response in case of network frequency contingencies, comparing the pure hydroelectric plant with the hybrid one, in which the primary reserve is partially or completely supplied by the storage system. Results confirm that the battery storage system response to frequency perturbations is clearly faster and more accurate during the transient phase compared to a traditional plant, since time delays due to hydraulic and mechanical regulations are overpassed. A case study, based on data from an existing hydropower plant and referring to the Italian context in terms of operational constraints and ancillary service remuneration, is presented.

  4. Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F.; Odeh, Mufeed

    2001-01-01

    The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section

  5. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity.

    Directory of Open Access Journals (Sweden)

    Matt Finer

    Full Text Available Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1 There is a critical need for further strategic regional and basin scale evaluation of dams. 2 There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3 Reconsideration of hydropower as a low-impact energy source in the Neotropics.

  6. Hydroacoustic modelling and numerical simulation of unsteady operation of hydroelectric systems[Dissertation 3713

    Energy Technology Data Exchange (ETDEWEB)

    Nicolet, Ch.

    2007-03-15

    Hydropower represented in 1999 19% of the world electricity production and the absolute production is expected to grow considerably during the next 30 years. Francis turbines play a major role in the hydroelectric production due to their extended range of application. Due to the deregulated energy market, hydroelectric power plants are increasingly subjecting to off design operation, start-up and shutdown and new control strategies. Consequently, the operation of Francis turbine power plants leads to transients phenomena, risk of resonance or instabilities. The understanding of these propagation phenomena is therefore paramount. This work is a contribution to the hydroacoustic modelling of Francis turbine power plants for the investigation of the aforementioned problematic. The first part of the document presents the modelling of the dynamic behavior and the transient analysis of hydroelectric power plants. Therefore, the one-dimensional model of an elementary pipe is derived from the governing equations, i.e. momentum and continuity equations. The use of appropriate numerical schemes leads to a discrete model of the pipe consisting of a T-shaped equivalent electrical circuit. The accuracy in the frequency domain of the discrete model of the pipe is determined by comparison with the analytical solution of the governing equations. The modelling approach is extended to hydraulic components such as valve, surge tanks, surge shaft, air vessels, cavitation development, etc. Then, the modelling of the Francis, Pelton and Kaplan turbines for transient analysis purposes is presented. This modelling is based on the use of the static characteristic of the turbines. The hydraulic components models are implemented in the EPFL software SIMSEN developed for the simulation of electrical installations. After validation of the hydraulic models, transient phenomena in hydroelectric power plants are investigated. It appears that standard separate studies of either the hydraulic or of

  7. Planning small hydroelectric power plants, considering private sector prospects; O planejamento de pequenas centrais hidreletricas face as perspectivas da iniciativa privada

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, Carlos B. [Minas Gerais Univ., Belo Horizonte, MG (Brazil). Dept. de Engenheria Hidraulica e Recursos Hidricos; Bajay, Sergio V. [Universidade Estadual de Campinas, SP (Brazil)

    1996-12-31

    The participation of the private sector in the generation of electric power in Brazil and the experiences of private groups in the construction and operation of small hydroelectric power plants are analysed. 10 refs., 2 figs., 2 tabs

  8. A model optimization for pre-dispatch among the hydroelectric generator unities; Um modelo de otimizacao para pre-despacho entre as unidades geradoras de hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Colnago, Glauber R.; Correia, Paulo B. [Universidade Estadual de Campinas (UNICAMP), Campinas, SP (Brazil). Faculdade de Engenharia Mecanica]. E-mails: grcolnago@fem.unicamp.br; pcorreia@fem.unicamp.br

    2006-07-01

    This work proposes a mixed integer nonlinear programming model to pre-dispatch of a hydroelectric power plant. In the model we want to minimize the losses in the electricity generation with conditions of electricity demand, operational prohibited zones and units' efficiency data. The Xingo Hydroelectric Power Plant was utilized in the mode tests. The solver used was Lingo 8.0. (author)

  9. Know-how from Austria for a hydroelectric power plant in Hungary. The Nagymaros power plant is under construction at the Danube river

    Energy Technology Data Exchange (ETDEWEB)

    Fremuth, W.

    1989-06-01

    In Hungary, a hydroelectric power plant is being constructed at the Danube river and is planned to be operated by the CSSR and Hungary. The project management is an Austrian company, Donaukraft, who thus inverts its know-how in hydroelectric power plant construction. The plant is planned to be ready for operation by 1994, and will stretch out over a distance of 180 kilometers along the Danube river, supplying about 171 MW of electricity. (orig.).

  10. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  11. The use of Amazon hydroelectric potential compared to other options; O uso do potencial hidroeletrico da Amazonia versus outras opcoes

    Energy Technology Data Exchange (ETDEWEB)

    Furtado, Ricardo C. [Companhia Hidreletrica do Sao Francisco (CHESF), Recife, PE (Brazil)

    1997-12-31

    This article discusses the use of the Amazon hydroelectric potential for the expansion of the generation system in Brazil. It examines the main options of electricity production and compares these electric power resources in terms of the electricity consumers`and experts`perceptions of the environmental impacts and costs. This analysis is based on a Ph D research carried out from 1993 to 1995 (Furtado, 1996). The findings of the study show that, from the environmental perspective, hydroelectric power is the most attractive option for the expansion of the generation system in Brazil, followed by the coal option and, in a distant third place, the nuclear option. (author) 15 refs., 4 tabs.; e-mail: furtado at elogica.com.br

  12. Bakun/Malaysia: Energy supply assurance on the basis of hydroelectric power generation. Bakun/Malaysia: Energiesicherung durch Wasserkraft

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    The project agreement 'hydro electric scheme Sarawak' made on 1st December 1979 between the Federal German Government and the Malaysian Government expires at the end of the year. The project aim of this collaboration which has existed for more than nine years consisted in the entire planning to exploit the hydroelectric potential in Sarawak. The working results range from the general inspection of the electricity supply via detail studies to the documents concerning the calls for tenders. All planning results necessary for a technically feasible and economically meaningful decision to utilize the hydro-electric potential in Sarawak which is justifiable as far as the effects on the environment are concerned, will be presented to the Malaysian government as a recommendation.

  13. Flow-Induced Pulsation and Vibration in Hydroelectric Machinery Engineer’s Guidebook for Planning, Design and Troubleshooting

    CERN Document Server

    Dörfler, Peter; Coutu, André

    2013-01-01

    Since the 1970’s, an increasing amount of specialized research has focused on the problems created by instability of internal flow in hydroelectric power plants. However, progress in this field is hampered by the inter­disciplinary nature of the subject, between fluid mechanics, structural mechanics and hydraulic transients. Flow-induced Pulsation and Vibration in Hydroelectric Machinery provides a compact guidebook explaining the many different underlying physical mechanisms and their possible effects.   Typical phenomena are described to assist in the proper diagnosis of problems and various key strategies for solution are compared and considered with support from practical experience and real-life examples. The link between state-of the-art CFD computation and notorious practical problems is discussed  and quantitative data is provided on  normal levels of vibration and pulsation so realistic limits can be set for future projects. Current projects are also addressed as the possibilities and limitatio...

  14. EVALUATION OF OPTIONS FOR ERECTING SMALL HYDROELECTRIC POWER PLANTS ON THE RIVER BYSTRZYCA PÓŁNOCNA

    Directory of Open Access Journals (Sweden)

    Andrzej Mazur

    2016-11-01

    Full Text Available This paper contains an analysis of conditions for erecting small hydroelectric power plants on the selected river in Lublin Region. The analysis covers technical options of the location of the facilities and their energy potential split into theoretical and technical potential. In addition, it refers to the most important legislative acts governing water management, including environmental protection. According to the analysis, the technical potential of small hydroelectric power plants on the river Bystrzyca Północna is about 125.5 kW. Energy production capacity is limited by both hydrological conditions and the necessity to adapt to regulatory framework concerning nature and environment protection, superior functions of watercourses and their situation in agricultural land.

  15. Chapter Twelve

    African Journals Online (AJOL)

    User

    dissemination in Nigeria· Some local jingles from Radio Nigeria Purity F.M. .... Indigenous Language in Advertisement: Problems and Prospects – Thecla ... the rural newspapers from performing their role of rural development· The ..... Sharma Raman, M· and, S (2004), Technical Communication Principle and Practice· India:.

  16. Problems of hydroelectric development at existing dams: an analysis of institutional, economic, and environmental restraints in Pennsylvania, New Jersey, and Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.J.; Green, L.L.

    1979-04-01

    The methodology that has been developed to analyze the impact of possible government actions on the development of small-scale hydroelectric power in the United States is described. The application of the methodology to a specific region of the United States is also described. Within the Pennsylvania-New Jersey-Maryland (PJM) region, the methodology has been used to evaluate the significance of some of the existing institutional and economic constraints on hydroelectric development at existing dams. The basic process for the analysis and evaluation is estimation of the hydroelectric energy that can be developed for a given price of electricity. Considering the present constraints and a geographical region of interest, one should be able to quantify the potential hydroelectric energy supply versus price. Estimates of how the supply varies with possible changes in governmental policies, regulations, and actions should assist the government in making decisions concerning these governmental functions relative to hydroelectric development. The methodology for estimating the hydroelectric supply at existing dams is included.

  17. Construction of the sustainable society and expectations of hydroelectric power engineers; Jizoku kanona shakai no kochiku to suiryoku gijutsusha eno kitai

    Energy Technology Data Exchange (ETDEWEB)

    Kurokawa, J. [Yokohama National University, Yokohama (Japan). Faculty of Engineering

    1999-10-10

    In the global competition among enterprises, even if winning the economic war, there will be waiting the construction of the sustainable society. The resource circulating type society should be aimed at. The present rich society was brought by exchange for the waste of resource/energy, but on the other hand, it brought a lot of spiritual poverty. Conserving resource/energy and heightening the utilization efficiency, the nature-human balance should be regained. The hydroelectric energy is the highest in density and the lowest in CO2 emission rate of all the natural energies. It is a highly excellent energy. In Japan, large hydroelectric power resource had almost been developed, and there remains only small hydroelectric power resource. Nevertheless, 20 million KW, 45% of all the hydroelectric power in Japan, remain undeveloped. It is said that small hydroelectric power does not pay because of its high developmental expenses, but it merits developmental efforts to be made by the persons concerned, as compared with wind power, solar energy, etc. In future, it is necessary to change the idea to the one of effective and multi-purpose utilization of low quality distributed small hydroelectric power resource. (NEDO)

  18. RECOVERY OF AN OXISOL DEGRADED BY THE CONSTRUCTION OF A HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Joseane Carina Borges de Carvalho

    2015-12-01

    Full Text Available ABSTRACT The removal of thick layers of soil under native scrubland (Cerrado on the right bank of the Paraná River in Selvíria (State of Mato Grosso do Sul, Brazil for construction of the Ilha Solteira Hydroelectric Power Plant caused environmental damage, affecting the revegetation process of the stripped soil. Over the years, various kinds of land use and management systems have been tried, and the aim of this study was to assess the effects of these attempts to restore the structural quality of the soil. The experiment was conducted considering five treatments and thirty replications. The following treatments were applied: stripped soil without anthropic intervention and total absence of plant cover; stripped soil treated with sewage sludge and planted to eucalyptus and grass a year ago; stripped soil developing natural secondary vegetation (capoeira since 1969; pastureland since 1978, replacing the native vegetation; and soil under native vegetation (Cerrado. In the 0.00-0.20 m layer, the soil was chemically characterized for each experimental treatment. A 30-point sampling grid was used to assess soil porosity and bulk density, and to assess aggregate stability in terms of mean weight diameter (MWD and geometric mean diameter (GMD. Aggregate stability was also determined using simulated rainfall. The results show that using sewage sludge incorporated with a rotary hoe improved the chemical fertility of the soil and produced more uniform soil pore size distribution. Leaving the land to develop secondary vegetation or turning it over to pastureland produced an intermediate level of structural soil quality, and these two treatments produced similar results. Stripped soil without anthropic intervention was of the lowest quality, with the lowest values for cation exchange capacity (CEC and macroporosity, as well as the highest values of soil bulk density and percentage of aggregates with diameter size <0.50 mm, corroborated by its lower

  19. A performance overview about fire risk management in the Brazilian hydroelectric generating plants and transmission network

    Energy Technology Data Exchange (ETDEWEB)

    Duarte, Dayse [Universidade Federal de Pernambuco, Dept. de Engenharia de Producao, Recife, PE (Brazil)

    2004-01-01

    : scenario identification and consequence analysis. It was based on fire dynamics principles, structure engineering and data. The relevant data includes CIGRE failure data, fire accident reports and CHESF maintenance experience on equipment. The analysis focus is on the difficulties that the hydroelectric plants and the transmission sector in Brazil have in tackling fire protection. They make no allusion to the need to take the fire risks that could lead to some type of impact in the interconnected network into consideration. It is hoped that the performance analysis in this study will shed some light on our ability to anticipate unwanted interactions along a hydroelectric plant or substation life circle. (Author)

  20. A UK guide to intake fish-screening regulations, policy and best practice with particular reference to hydroelectric power schemes

    Energy Technology Data Exchange (ETDEWEB)

    Turnpenny, A.W.H.; Struthers, G.; Hanson, P.

    1998-07-01

    A review of fish screening regulations in England, Wales, Scotland, and Northern Ireland is presented, and a summary of findings on screening legislation is given. The views of hydroelectric scheme developers, owners and operators are considered, and recommendations including the development of a risk assessment procedure are discussed. Fish screening technology, bypasses and other escape routes, and common fault in screen design and operation are examined, and guidance to Best Practice is given. (UK)

  1. Operator training for the Yacyreta binational hydroelectric power plant; Formacion de operadores para la Central Hidroelectrica de Yacireta

    Energy Technology Data Exchange (ETDEWEB)

    Dure, Francisco; Tachella, Heriberto [Entidad Binacional Yacyreta, Isla Yacireta (Paraguay). Central Hidroelectrica Yacyreta]. E-mail: yacyreta@internet.siscotel.com

    1998-07-01

    This work is oriented to the power plant operators, by exposing the criteria and methods adopted for operators selection, training and incorporation to the Yacyreta Hydroelectric Power Plant. The used criteria considered some aspects, as follows: the operation staff should be consisted of equal numbers of Argentine and Paraguayan nationalities, viewing the both systems operation; experience of the shift supervisors in operating a plant for a minimum of 10 years; the supervisors should participate training the auxiliary operators.

  2. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development IV: Fish Mortality Resulting From Turbine Passage

    Energy Technology Data Exchange (ETDEWEB)

    Turbak, Susan C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Reichle, Donna R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Shriner, Carole R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1981-01-01

    The purpose of this report is to provide summary information for use by potential developers and regulators of small-scale hydroelectric projects (defined as existing dams that can be retrofitted to a total site capacity of ≤30 MW), where turbine-related mortality of fish is a potential issue affecting site-specific development. Mitigation techniques for turbine-related mortality are not covered in this report.

  3. Executive summary: legal obstacles and incentives to small-scale hydroelectric development in the six middle atlantic states

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The executive summary describes the relationship of Federal law and regulation to state law and regulation of small-scale hydroelectric facilities, highlighting important features of the constitutional, statutory, case law, and regulations of each of the six middle atlantic states (Maryland, Delaware, New York, New Jersey, Pennsylvania, and Virginia). Water law, direct and indirect regulation, and financial considerations for each state are presented. A flow diagram of regulation of small dams in each state is also included.

  4. How Will Hydroelectric Power Generation Develop under Climate Change Scenarios? A Case Study in the Upper Danube Basin

    Directory of Open Access Journals (Sweden)

    Markus Weber

    2011-09-01

    Full Text Available Climate change has a large impact on water resources and thus on hydropower. Hydroelectric power generation is closely linked to the regional hydrological situation of a watershed and reacts sensitively to changes in water quantity and seasonality. The development of hydroelectric power generation in the Upper Danube basin was modelled for two future decades, namely 2021–2030 and 2051–2060, using a special hydropower module coupled with the physically-based hydrological model PROMET. To cover a possible range of uncertainties, 16 climate scenarios were taken as meteorological drivers which were defined from different ensemble outputs of a stochastic climate generator, based on the IPCC-SRES-A1B emission scenario and four regional climate trends. Depending on the trends, the results show a slight to severe decline in hydroelectric power generation. Whilst the mean summer values indicate a decrease, the mean winter values display an increase. To show past and future regional differences within the Upper Danube basin, three hydropower plants at individual locations were selected. Inter-annual differences originate predominately from unequal contributions of the runoff compartments rain, snow- and ice-melt.

  5. The Effect of Hydroelectric Power Plants (hpp) on Agro-Life at Rural Land Regulation in Turkey

    Science.gov (United States)

    Onursal Denli, G.; Denli, H. H.; Seker, D. Z.; Bitik, E.; Cetin, S.

    2014-12-01

    Turkey is one of the self-sufficient in foodstuffs and globally ranks as 7th significant agricultural exporter in the world. Main trading partners are the European Union, the United States and the Middle East. As known, agricultural production is dependent on factors including efficient and effective use of all inputs ranging from those natural resources as in land and water to well-trained human resources as labour at the production. The socio-economic aspects of this sector take several forms ranging from the incomes of the primary producers. Rural land regulation is a necessity for rural areas and is regarded as a useful instrument for improving farmer's incomes and life standards. The irrigation system, established during the rural regulation/land consolidation period of large-scale farming, is insufficiently adjusted to the new land tenure structures. The government is especially in the process of water management with hydroelectric power plants. This process produces energy that is required but effects negatively the rivers and agricultural, environmental, climatic conditions. Rivers are vessels of the nature. Free flowing rivers give life to all nature. Most of the studies indicate that Hydroelectric Power Plants (HPP) affects the surface and ground-water management, natural life, agricultural productivity, socio-economic situation at agricultural regions and agro-life related with immigration. This study emphasizes the effect of Hydroelectric Power Plants which are used in transformation of water as a renewable natural resource into electricity power from the perspective of environmental policies and rural regulation.

  6. Impact of hydroelectric projects on river environment: Analysis of water quality changes in Ningxia Reach of Yellow River

    Directory of Open Access Journals (Sweden)

    Sun Dongpo

    2008-06-01

    Full Text Available In this paper, the relationship between hydroelectric projects and the river environment is analyzed. Recently, the large-scale regulation of runoff by large hydroelectric projects in the Ningxia Reach of the Yellow River has altered natural runoff processes, causing an increase in the probability of low discharge and an overall adjustment of riverbed evolution and river characteristics. During low-flow years, the combined effects of these two changes can weaken the self-purification capacity and reduce the water environmental capacity of the river. This is one of the main reasons for the recent decrease of water quality in the Ningxia Reach. This research shows that it is necessary to implement river training projects to maintain stable flow paths, not only for adjusting river regimes and for flood control, but also for increasing the self-purification capacity and the water environmental capacity of the river. Methods and proposals for coordinating the operation of hydroelectric projects with the protection of the river environment are presented in the interest of promoting sustainable development.

  7. Impact of hydroelectric projects on river environment: Analysis of water quality changes in Ningxia Reach of Yellow River

    Institute of Scientific and Technical Information of China (English)

    Sun Dongpo; Lu Ruili; Song Yongjun; Yan Jun

    2008-01-01

    In this paper, the relationship between hydroelectric projects and the river environment is analyzed. Recently, the large-scale regulation of runoff by large hydroelectric projects in the Ningxia Reach of the Yellow River has altered natural runoff processes, causing an increase in the probability of low discharge and an overall adjustment of riverbed evolution and river characteristics. During low-flow years, the combined effects of these two changes can weaken the self-purification capacity and reduce the water environmental capacity of the river. This is one of the main reasons for the recent decrease of water quality in the Ningxia Reach. This research shows that it is necessary to implement river training projects to maintain stable flow paths, not only for adjusting river regimes and for flood control, but also for increasing the self-purification capacity and the water environmental capacity of the river. Methods and proposals for coordinating the operation of hydroelectric projects with the protection of the river environment are presented in the interest of promoting sustainable development.

  8. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 1. Pacific Northwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The preliminary inventory and analysis procedures provide a comprehensive assessment of the undeveloped hydroelectric power potential in the US and determines which sites merit more thorough investigation. Over 5400 existing structures have been identified as having the physical potential to add hydropower plants or increase hydropower output thereby increasing our present hydropower capacity from a total of 64,000 MW to 158,000 MW and our energy from 280,000 GWH to 503,000 GWH. While the physical potential for this increase is clearly available, some of these projects will undoubtedly not satisfy more-detailed economic analysis as well as the institutional and environmental criteria which will be imposed upon them. Summary tables include estimates of the potential capacity and energy at each site in the inventory. In some cases, individual projects may be site alternatives to others in the same general location, when only one can be considered for hydropower development. The number of sites per state is identified, but specific information is included for only the sites in Alaska, Idaho, Oregon, and Washington in this first volume.

  9. CFD evaluation of added damping due to fluid flow over a hydroelectric turbine blade

    Science.gov (United States)

    Gauthier, J. P.; Giroux, A. M.; Etienne, S.; Gosselin, F. P.

    2016-11-01

    To estimate structural fatigue, vibrational response to realistic spectrum of excitations and associated equivalent damping are of paramount importance. In this paper, an approach to quantify flow-induced damping of a relatively heavy fluid on a vibrating hydraulic turbine blade using numerical simulations is presented. First, mode shapes and frequencies of the immersed structure are obtained by modal analysis using the finite element method. Then, forced oscillatory modal motion is prescribed on the structural boundary of unsteady Reynolds-averaged Navier-Stokes flow simulations. Damping is finally computed as the normalized work done by the resulting fluid load on the structure. Validation is achieved by comparing the numerical results with available experimental data for a steel hydrofoil oscillating in flowing water. For this case, the linear increase in the damping ratio with the flow velocity is reproduced within 10% of the experimental values. Application of the method to an actual hydroelectric propeller turbine blade yields a fluid damping value of around 15% of critical damping for its first vibration mode.

  10. The wildlife research & rescue programme for mammals at Hulu Terengganu Hydroelectric Project (HTHEP), Terengganu, Peninsular Malaysia

    Science.gov (United States)

    Nur-Syuhada, N.; Magintan, D.; Siti-Hajar, A. R.; Aisah, M. S.; Shukor, M. N.

    2016-11-01

    During the inundation of the Hulu Terengganu Hydroelectric Project in October 2014, a wildlife rescue programme was conducted to rescue animals found trapped within the expanding 61.6 km2 reservoir. A total of 244 mammals from 30 species, representing 12 families were rescued by various methods included baited live trapping, catchpoles, hoop nets and by hand. The order Rodentia recorded the highest amount of rescued individuals at 20.9%, followed by Primate (18.9), Dermoptera (11.1), Carnivora (0.8) and Pholidota (0.4). The genus Rattus recorded the highest individuals rescued (51 individuals) probably due to the rapid clear-cut logging of the forest prior to inundation. Notable mammals of high conservational value rescued included Manis javanicus (Pangolin), Presbytis melalophos siamensis (Mitred Leaf Monkey), Trachypithecus obscurus (Dusky Leaf Monkey), Hylobates lar (White Handed Gibbon), Nycticebus coucang (Slow Loris), Galeopterus variegatus (Sunda Colugo), Callosciurus nigrovittatus (Sunda Black-banded Squirrel), Ratufa spp. (Giant Squirrels), and Sundasciurus hippurus (Horse-tailed Squirrel). Various data and biological samples were collected from the mammals rescued prior to their release at the nearest forest reserves. Rescue operation enabled the inventory and comprehensive data collection of various arboreal and rare mammal species that are hard to capture using the traditional survey method.

  11. Impacts of hydroelectric dams on alluvial riparian plant communities in eastern Brazilian Amazonian

    Directory of Open Access Journals (Sweden)

    LEANDRO VALLE FERREIRA

    2013-09-01

    Full Text Available The major rivers of the Amazon River basin and their biota are threatened by the planned construction of large hydroelectric dams that are expected to have strong impacts on floodplain plant communities. The present study presents forest inventories from three floodplain sites colonized by alluvial riparian vegetation in the Tapajós, Xingu and Tocantins River basins in eastern Amazonian. Results indicate that tree species of the highly specialized alluvial riparian vegetation are clearly distinct among the three river basins, although they are not very distinct from each other and environmental constraints are very similar. With only 6 of 74 species occurring in all three inventories, most tree and shrub species are restricted to only one of the rivers, indicating a high degree of local distribution. Different species occupy similar environmental niches, making these fragile riparian formations highly valuable. Conservation plans must consider species complementarily when decisions are made on where to place floodplain forest conservation units to avoid the irreversible loss of unique alluvial riparian vegetation biodiversity.

  12. Hydroelectricity, land use and water managing; Hidroelectricidad, uso del suelo y manejo del agua

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez Canet, Lourdes [Proyectos Geotermoelectricos, Aplica, S. A., Mexico, D. F. (Mexico)

    1997-12-31

    This document deals with the importance of determining the vocation of the geographic site where it is pretended to execute a hydroelectric project, since it is necessary to asses various alternative sites, in order to select the most appropriate, where the environmental impacts be less, without forgetting for a minute the ecological criteria for its final selection. Unfortunately there are not environmental studies of periodic continuation departing from the commissioning of a dam, since this studies would permit to know the real environmental impacts in order to solve them later [Espanol] Este documento trata la importancia de determinar la vocacion del lugar geografico donde se pretende llevar a cabo un proyecto hidroelectrico, ya que es necesario evaluar diversos lugares alternativos, con objeto de elegir el mejor, donde los impactos ambientales sean menores, sin olvidar en ningun momento los criterios ecologicos para su eleccion definitiva. Lamentablemente no hay estudios ambientales de seguimiento periodicos a partir de que una presa se encuentre en operacion, ya que estos estudios permitirian conocer realmente los impactos ambientales para poder solucionarlos posteriormente

  13. Determination of methane emissions in three hydroelectric dams in Costa Rica

    Directory of Open Access Journals (Sweden)

    Jorge Herrera

    2013-12-01

    Full Text Available The emission fluxes of methane (CH4 across air–water interface were measured in three hydroelectric dams in Costa Rica (Brasil, Nuestro Amo and Cote Lake during three years cycle (2009-2011, using the floating static chamber technique. Samples were taken during one week, both day and night time, through four campaigns per year. For the methane flux determination the water surface was divided in a 4x4 grid equally spaced. During this period, CH4 fluxes showed average values that ranged from 759 – 4282 (Brasil, 77 – 733 (Nuestro Amo and 10,9 – 44,2 mg CH4 m-2 d-1 (Cote Lake, respectively. The fluxes of CH4 showed both strong seasonal and diurnal variations. CH4 emission rate was highest in dry season and there was a significant difference for CH4 emissions between day and night, the ratios between nighttime to daytime methane flux increased from 0,35 to 0,72, 0,43 to 0,64 for Brasil and Nuestro Amo, respectively in this season. CH4 emission was correlated positively with soil temperature, water table and chlorophyll a water concentrations.

  14. Hydroelectric microcentrals for small consumption centers; Microcentrales hidroelectricas para pequenos centros de consumo

    Energy Technology Data Exchange (ETDEWEB)

    Angeles A, V. H.; Espino C, F. P. [Universidad Autonoma Metropolitana, Mexico, D. F. (Mexico); Buitron Sanchez, H. C. [Programa de Ahorro de Energia para el Sector Electrico, Mexico, D. F. (Mexico)

    1995-12-31

    The utilization of alternate energy sources (wind power, solar and hydro to small scale) represents an option for the rural electrification. This paper analyzes the case of hydro microgeneration, for this purpose the mechanical and electrical fitting are mainly discussed. For the mechanical re-equipment the turbine types that can be used are fundamentally presented and how they can be selected. As to the electrical re-equipment the different types of electric generators are discussed, as well as the form of selecting them, the operation, the control and the protection in the hydroelectric microcentrals. [Espanol] La utilizacion de fuentes alternas de energia (eolica, solar e hidraulica a pequena escala) representan una alternativa para la electrificacion rural. Este trabajo trata del caso de la microgeneracion hidraulica para la cual se discuten principalmente, alternativas para el equipamiento mecanico y electrico. Para el equipamiento mecanico se presentan fundamentalmente los tipos de turbinas que pueden ser utilizadas y como se pueden seleccionar. En cuanto al equipo electrico se manejan los diferentes tipos de generadores, la forma de seleccionarlos, la operacion, el control y la proteccion en las microcentrales hidroelectricas.

  15. Lake Robertson hydroelectric project. Construction of a roller compacted concrete dam

    Energy Technology Data Exchange (ETDEWEB)

    Labelle, M.; Robitaille, F. [Hydro-Quebec, Montreal, PQ (Canada)

    1995-12-31

    Construction of the Lake Robertson hydroelectric project on Quebec`s Lower North Shore was discussed in detail. The dam and powerhouse, located on the HaHa River, consists of a 134 m long concrete gravity dam, and a 21 MW powerhouse with two 69 kV transmission lines and four substations. The climate, terrain, and geography of the region, all of them characterized as severe, and the logistics of construction of the dam and power lines, aggravated by the isolation and severe conditions at the site, were described. The roller compacted concrete design and construction were noted, and justification for a concrete dam over an earth-fill dam was provided. Economics, properties, and composition of the roller compacted concrete (RCC) were examined, and control test results for the RCC concrete were provided. The use of RCC for the Lake Robertson development was described as successful in terms of the quality, watertightness, and completion time. The experience gained by the participants will make it possible to offer RCC as an alternative on various other projects. 2 figs.

  16. Development of an HTS hydroelectric power generator for the hirschaid power station

    Science.gov (United States)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  17. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  18. Overview of, and demands on, small hydroelectric turbines; Kleinwasserturbinen, Ueberblick und Anforderungen

    Energy Technology Data Exchange (ETDEWEB)

    Lein, G. [Stuttgart Univ. (Germany). Inst. fuer Stroemungsmechanik und Hydraulische Stroemungsmaschinen

    1997-12-31

    The report deals with some aspects of small hydroelectric turbines which the reporter`s experience has proved to be relevant. Although this experience derives in part from larger units, most of it holds true also of small turbines. The report does not restrict itself to the high-tech conditions of central Europe. A brief overview of turbine types is given. Questions of the choice and construction of turbines, and questions relating to guarantees and their verification are discussed. Some important standards, norms and guidelines which apply to small turbines are pointed out. (orig.) [Deutsch] Im folgenden Bericht werden einige Aspekte von Kleinwasserturbinen angesprochen, die nach der Erfahrung des Berichters von Wichtigkeit sind. Wenn diese Erfahrungen auch zum Teil an groesseren Einheiten gewonnen wurden, so sind sie doch ueberwiegend auch fuer Kleinturbinen gueltig. Der Bericht beschraenkt sich dabei nicht auf Verhaeltnisse in unserem hochtechnisierten mitteleuropaeischen Raum. Nach einem kurzen Ueberblick ueber die Turbinentypen werden Fragen der Turbinenauswahl und -konstruktion und der Garantien und deren Nachweis angesprochen. Schliesslich wird eine Uebersicht ueber einige wichtige Standards, Normen und Richtlinien, die auf Kleinturbinen angewendet werden koennen, gegeben. (orig.)

  19. Distribution of Major and Trace Elements in a Tropical Hydroelectric Reservoir in Sarawak, Malaysia

    Science.gov (United States)

    Nyanti, Lee; Ean Lee, Terri Zhuan; Mohd Irwan Lu, Nurul Aida Lu

    2014-01-01

    This paper reports the metals content in water, sediment, macroalgae, aquatic plant, and fish of Batang Ai Hydroelectric Reservoir in Sarawak, Malaysia. The samples were acid digested and subjected to atomic absorption spectrometry analysis for Na, K, Mn, Cr, Ni, Zn, Mg, Fe, Sn, Al, Ca, As, Se, and Hg. The total Hg content was analysed on the mercury analyser. Results showed that metals in water, sediment, macroalgae, aquatic plant, and fish are distinguishable, with sediment and biota samples more susceptible to metal accumulation. The distributions of heavy metals in water specifically Se, Sn, and As could have associated with the input of fish feed, boating, and construction activities. The accumulation of heavy metals in sediment, macroalgae, and aquatic plant on the other hand might be largely influenced by the redox conditions in the aquatic environment. According to the contamination factor and the geoaccumulation index, sediment in Batang Ai Reservoir possesses low risk of contamination. The average metal contents in sediment and river water are consistently lower than the literature values reported and well below the limit of various guidelines. For fishes, trace element Hg was detected; however, the concentration was below the permissible level suggested by the Food and Agriculture Organization. PMID:27437493

  20. Supporting measures for hydroelectric power: Legal price regulation; Die preisrechtliche Foerderung der Energiegewinnung aus Wasserkraft

    Energy Technology Data Exchange (ETDEWEB)

    Knoedler, H. [Hochschule fuer Verwaltungswissenschaften, Speyer (Germany). Lehrstuhl fuer Wirtschaftliche Staatswissenschaften, insbesondere Allgemeine Volkswirtschaftslehre, Wirtschaftspolitik; Theobald, C. [Hochschule fuer Verwaltungswissenschaften, Speyer (Germany). Lehrstuhl fuer Verwaltungswissenschaft, Regierungslehre und Oeffentliches Recht

    1996-12-31

    In Germany, the utilization of water-power has a long tradition. Its share of the public electricity supply amounts to almost 4% with an upward trend, making hydroelectric power the leader among the renewable sources of energy. The fact that the growing contribution of water-power is an important element of future-oriented energy policy has only recently been confirmed by the German Federal Government. The following examines whether it is justified to claim that the electricity feed-in law (Stromeinspeisungsgesetz) from 1991 - a corner-stone in promoting renewable sources of energy - is unconstitutional. The paper also illustrates differences between economists and lawyers in characterizing taxes. (orig.) [Deutsch] Die Nutzung der Wasserkraft hat in Deutschland eine lange Tradition. Ihr Anteil an der Bereitstellung des Stroms fuer die oeffentliche Versorgung betraegt knapp 4% bei steigender Tendenz, womit sie Marktfuehrer unter den regenerativen Energietraegern ist. Dass deren verstaerkte Nutzung wichtiger Bestandteil einer zukunftsweisenden Energiepolitik ist, hat die Bundesregierung erst kuerzlich wieder bekraeftigt. Ob das Stromeinspeisungsgesetz (StrEG) - als ein Eckpfeiler zur Foerderung regenerativer Energietraeger - gegenwaertig zurecht dem Vorwurf der Verfassungswidrigkeit ausgesetzt ist, hinterfragt der folgende Beitrag. (orig.)

  1. Feasibility determination of hydroelectric power generation at Patillas Reservoir, Puerto Rico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Huetter, J.J. Jr.

    1979-02-01

    The overall feasibility of retrofit for hydroelectric power generation at the Patillas Reservoir, an existing impoundment located near the town of Patillas, Puerto Rico, was studied. The scope of work and project intent is limited to establishing valid acceptance or non-acceptance criteria for this specific site as an example of power generation potential at existing dams of relatively low head (less than or equal to 20 m) in the United States. Information is included on hydrologic conditions at the site, retrofit plant design, economic analysis, environmental, legal, social and institutional aspects, and availability of plant equipment. It is concluded that generation of hydropower at Patillas is entirely practical and uncomplicated from an engineering viewpoint, has no adverse environmental effects and is economically justifiable for the island of Puerto Rico. The final agency or contractor roles for development are reasonably well-established. There are no prohibitory laws or regulations concerning this development. In fact, according to Puerto Rico legislation, such hydropower developments appear to be mandated. The installed capacity of the site ranges from 665 kW to approximately 1500 kW depending on extent of development of the available options. (LCL)

  2. On the performance of nondestructive testing methods in the hydroelectric turbine industry

    Science.gov (United States)

    Habibzadeh Boukani, H.; Viens, M.; Tahan, S. A.; Gagnon, M.

    2014-03-01

    Welded joints of turbine runners are one of the most critical parts of Francis turbines due to the presence of welding discontinuity and high stress. Because of thermal cycles, solidification, cooling distortion and residual stresses, welded joints always include discontinuities of different types and sizes. Some specific parameters will limit welding flaw dimensions in some or all direction based on the joint geometry, material and welding procedure. If discontinuities of critical size remain undetected, fatigue cracks might initiate and propagate in these zones because of dynamic in-service stresses leading to high repair costs and long down times. Therefore, reliable NDT methods and good knowledge of the probability of occurrence of welding flaws is important for fatigue life estimations. Every NDT method has its weaknesses; therefore, even after meticulous inspections it is likely for some discontinuities of critical sizes to remain in the welded joint. Our objective is to clarify the probability of detection and occurrence of different types of welding flaws in hydroelectric turbine runners. Furthermore, an overview of current nondestructive inspection methods and their capability in characterizing flaw dimensions will be discussed. Finally, advanced NDT techniques, for the characterization of welded joints integrity, will be proposed.

  3. Small-scale hydroelectric power in the southeast: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    The Southeastern conference, Small-Scale Hydroelectric Power: New Impetus for an Old Energy Source, was convened to provide a forum for state legislators and other interested persons to discuss the problems facing small-scale hydro developers, and to recommend appropriate solutions to resolve those problems. During the two-day meeting state legislators and their staffs, along with dam developers, utility and industry representatives, environmentalists and federal/state officials examined and discussed the problems impeding small-scale hydro development at the state level. Based upon the problem-oriented discussions, alternative policy options were recommended for consideration by the US Department of Energy, state legislatures and the staff of the National Conference of State Legislatures (NCSL). Emphasis was placed on the legal, institutional, environmental and economic barriers at the state level, as well as the federal delays associated with licensing small-scale hydro projects. Whereas other previously held conferences have emphasized the identification and technology of small-scale hydro as an alternative energy source, this conference stressed legislative resolution of the problems and delays in small-scale hydro licensing and development. Panel discussions and workshops are summarized. Papers on the environmental, economic, and legal aspects of small-scale hydropower development are presented. (LCL)

  4. Isolation and characterization of twelve microsatellite loci for the Japanese Devilray (Mobula japanica)

    NARCIS (Netherlands)

    Poortvliet, Marloes; Galvan-Magana, Felipe; Bernardi, Giacomo; Croll, Donald A.; Olsen, Jeanine L.

    2011-01-01

    Twelve polymorphic microsatellites loci were characterized for Mobula japanica (Japanese Devilray) using an enrichment protocol. All but two loci were in Hardy-Weinberg equilibrium with no evidence of linkage disequilibrium or null-alleles for a sample of 40 individuals from two populations. The num

  5. 17 CFR 210.3-06 - Financial statements covering a period of nine to twelve months.

    Science.gov (United States)

    2010-04-01

    ... ACT OF 1933, SECURITIES EXCHANGE ACT OF 1934, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935, INVESTMENT COMPANY ACT OF 1940, INVESTMENT ADVISERS ACT OF 1940, AND ENERGY POLICY AND CONSERVATION ACT OF 1975... to twelve months. Except with respect to registered investment companies, the filing of...

  6. Twelve new species of Triplocania Roesler (Psocodea: 'Psocoptera': Ptiloneuridae), from South America.

    Science.gov (United States)

    Silva Neto, Alberto Moreira Da; Aldrete, Alfonso N García; Rafael, José Albertino

    2016-05-09

    Twelve species of Triplocania, seven based on male and female specimens and five based on male specimens, are here described and illustrated; nine species are Brazilian, three are Ecuadorian, and one of the latter is shared with Peru. Comments on sexes known and distribution of the species are included.

  7. Portrayal of Life Form in Selected Biographies for Children Eight to Twelve Years of Age.

    Science.gov (United States)

    Koch, Shirley Lois

    This study describes and analyzes, in a critical literary manner, selected biographies for children eight to twelve years of age. Biographies of Jane Addams, Cesar Chavez, Mohandas Gandhi, Toyohiko Kagawa, Martin Luther King, Jr., and Albert Schweitzer are viewed from the perspective of a literary criterion based on the principles of design to…

  8. Premarital sex in the last twelve months and its predictors among ...

    African Journals Online (AJOL)

    Premarital sex in the last twelve months and its predictors among students of ... Statistical significance was determined through a 95% confidence level. ... having comprehensive knowledge of HIV [AOR(95% CI)=1.5(1.01-2.10)], alcohol use ...

  9. Portrayal of Life Form in Selected Biographies for Children Eight to Twelve Years of Age.

    Science.gov (United States)

    Koch, Shirley Lois

    This study describes and analyzes, in a critical literary manner, selected biographies for children eight to twelve years of age. Biographies of Jane Addams, Cesar Chavez, Mohandas Gandhi, Toyohiko Kagawa, Martin Luther King, Jr., and Albert Schweitzer are viewed from the perspective of a literary criterion based on the principles of design to…

  10. A novel double quad-inverter configuration for multilevel twelve-phase open-winding converter

    DEFF Research Database (Denmark)

    Padmanaban, Sanjeevi Kumar; Blaabjerg, Frede; Wheeler, Patrick William

    2016-01-01

    This paper describes a novel proposal of double quad-inverter configuration for multilevel twelve-phase open-winding ac converter. Modular power units are developed from reconfigured eight classical three-phase voltage source inverters (VSIs). Each VSI has one additional bi-directional switching ...

  11. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently

  12. Potential Coastal Pumped Hydroelectric Energy Storage Locations Identified using GIS-based Topographic Analysis

    Science.gov (United States)

    Parsons, R.; Barnhart, C. J.; Benson, S. M.

    2013-12-01

    Large-scale electrical energy storage could accommodate variable, weather dependent energy resources such as wind and solar. Pumped hydroelectric energy storage (PHS) and compressed energy storage area (CAES) have life cycle energy and financial costs that are an order of magnitude lower than conventional electrochemical storage technologies. However PHS and CAES storage technologies require specific geologic conditions. Conventional PHS requires an upper and lower reservoir separated by at least 100 m of head, but no more than 10 km in horizontal distance. Conventional PHS also impacts fresh water supplies, riparian ecosystems, and hydrologic environments. A PHS facility that uses the ocean as the lower reservoir benefits from a smaller footprint, minimal freshwater impact, and the potential to be located near off shore wind resources and population centers. Although technologically nascent, today one coastal PHS facility exists. The storage potential for coastal PHS is unknown. Can coastal PHS play a significant role in augmenting future power grids with a high faction of renewable energy supply? In this study we employ GIS-based topographic analysis to quantify the coastal PHS potential of several geographic locations, including California, Chile and Peru. We developed automated techniques that seek local topographic minima in 90 m spatial resolution shuttle radar topography mission (SRTM) digital elevation models (DEM) that satisfy the following criteria conducive to PHS: within 10 km from the sea; minimum elevation 150 m; maximum elevation 1000 m. Preliminary results suggest the global potential for coastal PHS could be very significant. For example, in northern Chile we have identified over 60 locations that satisfy the above criteria. Two of these locations could store over 10 million cubic meters of water or several GWh of energy. We plan to report a global database of candidate coastal PHS locations and to estimate their energy storage capacity.

  13. NEURAL CASCADED WITH FUZZY SCHEME FOR CONTROL OF A HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    A. Selwin Mich Priyadharson

    2014-01-01

    Full Text Available A novel design for flow and level control in a hydroelectric power plant using Programmable Logic Controller (PLC-Human Machine Interface (HMI and neural cascaded with fuzzy scheme is proposed. This project will focus on design and development of flow and level controller for small scale hydro generating units by implementing gate control based on PLC-HMI with the proposed scheme. The existing control schemes have so many difficulties to manage intrinsic time delay, nonlinearity due to uncertainty of the process and frequent load changes. This study presents the design of neuro controllers to regulate level, cascaded with fuzzy controller to control flow in gate valve to the turbine. A prototype model is fabricated in the laboratory as experimental setup for flow and level control and real time simulation studies were carried out using PID and neural cascaded with fuzzy scheme. The designed prototype model is fabricated with 5 levels in the upper tank and 2 levels in the lower tank. Based on the outputs of the level sensors from the upper and lower tanks, the ladder logic is actuated. This project work uses PLC of Bernecker and Rainer (B and R Industrial Automation inbuilt with 20 digital inputs and provides 12 potential free outputs to control the miniaturized process depicted in this work. Finally, the performance of the proposed neural cascaded with fuzzy scheme is evaluated by simulation results by comparing with conventional controllers output using real time data obtained from the hydro power plant. The advantages of the proposed neural cascaded with fuzzy scheme over the existing controllers are highlighted.

  14. Carbon stock estimation in the catchment of Kotli Bhel 1A hydroelectric reservoir, Uttarakhand, India.

    Science.gov (United States)

    Kumar, Amit; Sharma, M P

    2016-12-01

    Constructions of dams/reservoirs all over the world are reported to emit significant amount of greenhouse gases (GHGs) and are considered as environmental polluters. Organic carbon is contributed by the forest in the catchment, part of soil organic carbon is transported through the runoffs to the reservoir and undergoes aerobic and anaerobic degradation with time to release GHGs to the atmosphere. Literature reveals that no work is available on the estimation of 'C' stock of trees of forest catchment for assessing/predicting the GHGs emissions from the reservoirs to atmosphere. To assess the GHGs emission potential of the reservoir, an attempt is made in the study to estimate the 'C' stock in the forest catchment of Kotli Bhel 1A hydroelectric reservoir located in Tehri Garhwal district of Uttarakhand, India. For this purpose, the selected area was categorized into the site-I, II and III along the Bhagirathi River based on type of forest available in the catchment. The total carbon density (TCD) of tree species of different forest types was calculated using diameter at breast height (dbh) and trees height. The results found that the TCD of forest catchment was found 76.96MgCha(-1) as the highest at the site-II and 29.93MgCha(-1) as lowest at site-I with mean of 51.50MgCha(-1). The estimated forest 'C' stock shall be used to know the amount of carbon present before and after construction of the dam and to predict net GHGs emissions. The results may be helpful to study the potential of a given reservoir to release GHG and its subsequent impacts on global warming/climate challenges. Copyright © 2015 Elsevier Inc. All rights reserved.

  15. NOVEL TSUNAMI BARRIERS AND THEIR APPLICATIONS FOR HYDROELECTRIC ENERGY STORAGE, FISH FARMING, AND FOR LAND RECLAMATION

    Directory of Open Access Journals (Sweden)

    Hans J. Scheel

    2014-10-01

    Full Text Available The tsunami hazard can be mitigated if the destructive waves generated from earthquakes and landslides can be reflected by a stable submerged vertical barrier before striking coastal communities or important structures. Building such deep walls by conventional submarine technology is difficult. The present study describes the principle and the erection of such submarine defensive walls by a relatively simple efficient and economic technology. This technology is based on lowering high- strength steel fences with horizontal anchors, or two parallel steel fences with distance holders, into the sea and fixing them with rocks deposited from top. Dredged material like gravel or sand can be used for additional filling. This Tsunami-Flooding Barrier (TFB extends a few meters above sea level and carries on top a concrete supply and service road protected on both sides against storm waves by concrete walls. Replaceable surge stoppers (parapets, wave return walls prevent overtopping and erosion of the seaward barrier face. The TFBs protect the coastline against tsunami and the highest storm waves from hurricanes, but also can provide protection from oil spills or other contaminations from the ocean and thus protect flora, fauna, coral reefs and beaches. Channels and gates allow navigation and can be closed quickly upon a tsunami or storm warning. The construction costs can be eventually compensated by using the reservoirs between coast and barriers for hydroelectric energy storage (using pump-turbines in the barriers or for fish-farming, or alternatively the reservoir can be filled with rocks, rubble, gravel, sand and covered with soil in order to reclaim new land. Tidal energy can be generated by installing turbines within these barriers. Also, this submarine architecture may be applied to protect pillars of bridges and offshore platforms, and for erecting “roads” into the sea to connect near-shore platforms and wind-parks with the coast and

  16. Framework of systematic sustainability assessment strategy (FSSAS) for hydroelectric power industry in Malaysia

    Science.gov (United States)

    Johan, Kartina; Turan, Faiz Mohd

    2017-08-01

    Hydroelectric power is an alternative power resource in Malaysia and always associated with negative impact on environmental, social and economy of the surrounding site. The dispute over environmental, societal and economic issues can be minimised if compliance to sustainability development requirement is included in the project as part of the project premises during planning phase. This paper suggests a framework targeted for decision-makers in charge of implementing the projects to produce hydropower the sustainable way in Malaysian context which can mitigate the risks in social, environment and economy. The framework is strategic in nature and based on project management methodology with objective to provide a ‘common language’ by having a project value as measureable for stakeholders to state their mutual agreement of what a sustainable hydropower project in the context of Malaysia and in line with the United Nations (UN) 17 Sustainable Development Goals (SDGs). The paper discusses how the proposed systematic sustainability assessment strategy (FSSAS) framework support the call for Malaysia to promote meaningful public participation in ensuring land and natural resource decisions and to address citizens’ interests which is the core idea of Environmental Democracy Index established in 2014. The paper argues that, even though it is at present impossible to define precision status of sustainability development with respect to the nature of the multi stakeholders and the lack of systematic assessment the proposed FSSAS framework can be a valuable tool because it tracks the project value as a quantitative deliverable to determine the status of the journey in sustainable development towards accomplishing the SDG under a consensus in hydropower industry of any scale over time.

  17. Mercury methylation rates of biofilm and plankton microorganisms from a hydroelectric reservoir in French Guiana.

    Science.gov (United States)

    Huguet, L; Castelle, S; Schäfer, J; Blanc, G; Maury-Brachet, R; Reynouard, C; Jorand, F

    2010-02-15

    The Petit-Saut ecosystem is a hydroelectric reservoir covering 365km(2) of flooded tropical forest. This reservoir and the Sinnamary Estuary downstream of the dam are subject to significant mercury methylation. The mercury methylation potential of plankton and biofilm microorganisms/components from different depths in the anoxic reservoir water column and from two different sites along the estuary was assessed. For this, reservoir water and samples of epiphytic biofilms from the trunk of a submerged tree in the anoxic water column and from submerged branches in the estuary were batch-incubated from 1h to 3 months with a nominal 1000ng/L spike of Hg(II) chloride enriched in (199)Hg. Methylation rates were determined for different reservoir and estuarine communities under natural nutrient (reservoir water, estuary freshwater) and artificial nutrient (culture medium) conditions. Methylation rates in reservoir water incubations were the highest with plankton microorganisms sampled at -9.5m depth (0.5%/d) without addition of biofilm components. Mercury methylation rates of incubated biofilm components were strongly enhanced by nutrient addition. The results suggested that plankton microorganisms strongly contribute to the total Hg methylation in the Petit-Saut reservoir and in the Sinnamary Estuary. Moreover, specific methylation efficiencies (%Me(199)Hg(net)/cell) suggested that plankton microorganisms could be more efficient methylating actors than biofilm consortia and that their methylation efficiency may be reduced in the presence of biofilm components. Extrapolation to the reservoir scale of the experimentally determined preliminary methylation efficiencies suggested that plankton microorganisms in the anoxic water column could produce up to 27mol MeHg/year. Taking into account that (i) demethylation probably occurs in the reservoir and (ii) that the presence of biofilm components may limit the methylation efficiency of plankton microorganisms, this result is

  18. Fish passage mitigation of impacts from hydroelectric power projects in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Cada, G.F. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.

    1996-10-01

    Obstruction of fish movements by dams continues to be the major environmental issue facing the hydropower industry in the US. Dams block upstream migrations, which can cut off adult fish form their historical spawning grounds and severely curtail reproduction. Conversely, downstream-migrating fish may be entrained into the turbine intake flow and suffer turbine-passage injury or mortality. Hydroelectric projects can interfere with the migrations of a wide variety of fish. Maintenance, restoration or enhancement of populations of these species may require the construction of facilities to allow for upstream and downstream fish passage. The Federal Energy Regulatory Commission (FERC), by law, must give fish and wildlife resources equal consideration with power production in its licensing decisions, must be satisfied that a project is consistent with comprehensive plans for a waterway (including fisheries management plans), and must consider all federal and state resource agency terms and conditions for the protection of fish and wildlife. As a consequence, FERC often requires fish passage mitigation measures as a condition of the hydropower license when such measures are deemed necessary for the protection of fish. Much of the recent research and development efforts of the US Department of Energy`s Hydropower Program have focused on the mitigation of impacts to upstream and downstream fish passage. This paper descries three components of that effort: (1) a survey of environmental mitigation measures at hydropower sites across the country; (2) a critical review of the effectiveness of fish passage mitigation measures at 16 case study sites; and (3) ongoing efforts to develop new turbine designs that minimize turbine-passage mortality.

  19. Anthropic contribution on pollution in hydroelectric reservoirs: the case of Sao Simao's hydroelectric power plant - GO/MG, Brazil; Contribuicao antropica na poluicao de reservatorios hidreletricos: o caso da Usina Hidreletrica de Sao Simao - GO/MG

    Energy Technology Data Exchange (ETDEWEB)

    Fonseca, Gizele Araujo Borba da

    2010-02-15

    This study aimed to evaluate the contribution of anthropogenic pollution in hydroelectric reservoirs through a case study of the Sao Simao Hydropower. The literature relates the problem of eutrophication with the addition of nutrients (nitrogen and phosphorus) in excess, resulting in water pollution. Through data for both tributary rivers and the reservoir, it was found that the Sao Simao dam presents a framework for eutrophication. We made an analysis to see which tributary rivers were the main sources of nutrients released into the waters of the reservoir and a survey of possible human activities that are contributing to the intake of nutrients in these tributaries. (author)

  20. Case study analysis of the legal and institutional obstacles and incentives to the development of the hydroelectric power of the Boardman River at Traverse City, Michigan

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    An analytic description of one decision-making process concerning whether or not to develop the hydroelectric potential of the Boardman River is presented. The focus of the analysis is on the factor that the developers considered, or should consider in making a responsible commitment to small-scale hydroelectric development. Development of the Boardman River would occur at the five dam sites. Two existing dams, owned by the county, previously generated hydroelectricity, as did a third before being washed out. One dam has never been utilized. It is owned by the city which also owns the washed-out area. The study concludes that hydroelectric power is feasible at each. Grand Traverse County and Traverse City would engage in a joint venture in developing the resource. Chapter I presents a detailed description of the developers, the river resource, and the contemplated development. Chapter II is an analysis of the factors affecting the decision making process. Chapter III summarizes the impact of the more significant barriers and incentives and presents recommendations that, if implemented, will favorably affect decisions to develop small-scale hydroelectric generation capability.

  1. Feasibility study on the demonstrative test on the hybrid mini hydroelectric power generation technology. 2; Hybrid gata mini suiryoku hatsuden gijutsu ni kakawaru jissho shiken kanosei chosa. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    A study was made for the purpose of electrification of unelectrified zones of the mountainous areas in developing countries using extremely small hydroelectric power facilities. The target for this project is a development of a micro hydroelectric power system with a size of about 5kW, which is estimated regarding that 1 village has 80 houses and each house needs electricity of 60W. In the study, the low-head system using a weir of irrigation channels in Subang pref. of West Java state was selected by the evaluation of access, stability of flow rate, natural conditions, etc. The hydroelectric power plant is of a flow-in method in which water is taken from the left bank and is injected/discharged to the downstream of the left bank. As the hybrid complementary power source, hybrid battery with a two-hour charging time at peak and a capacity of 3.5kWh was considered. When estimating the construction cost of the hybrid micro hydroelectric power system and equalizing by durable years, the operational cost per kW is 15 times higher than the benefits which local people receive. It was judged to be difficult to say that the micro hydroelectric power system is economically feasible. It was predicted that the financial profit during the demonstrative test is good, according to a trial calculation of income from power rates and the operational cost. 18 refs., 90 figs., 53 tabs.

  2. Technological solutions of decentralized generation of hydroelectricity for those demands that cannot be attended by conventional electric with centralized generation

    Energy Technology Data Exchange (ETDEWEB)

    Signoretti, Valdir Tesche; Veras, Carlos Alberto Gurgel Rudi; Els, Henri Van [Universidade de Brasilia, Brasilia, DF (Brazil). Faculdade de Tecnologia. Dept. de Engenharia Mecanica], e-mail: gurgel@unb.br

    2010-07-01

    A source of energy stable and reliable and of acceptable cost is a basic requisite for the development of a given region can give-if full. Access to energy is important basis of human existence, essential to the satisfaction of basic needs such as food, clothing, and housing and also of mobility and communication. However, the dependency world burning of fossil fuels for energy generation and supply of a demand constantly increasing, both in industrialized countries and those in development, already threatening the ecological stability of the Earth. At the same time, conflicts by distribution of the last reserves these resources non-renewable threaten significantly to civil society. Adding to the breakneck speed in which humanity consumes the energetic sources and the obvious devastation of nature has an unequal distribution in consumption and access to energy. Renewable sources and energy efficiency are viable and necessary, especially because they can be the key to reduce wastefulness and extend the access to energy. In this way, there is a significant influence on economic and social inclusion of population excluded, generating employment and income with costs local and global environmental reduced compared to traditional forms and unsustainable generation and use of energy. This work is a study involving issues related to rural electrification from hydroelectricity, especially related to those isolated communities of the Amazon region that are lacking this form of energy, presented a general review since the origins of hydroelectricity in Brazil, as well as a national panorama electric exclusion as well as a scenario Amazon's supply of electricity. Finally presenting-if the main technologies available for hydroelectric generation for these isolated communities. (author)

  3. MODELING AND STUDY OF HYDROELECTRIC GENERATING SETS OF SMALL HYDRO POWER PLANTS WITH FREQUENCY-CONTROLLED PERMANENT MAGNET SYNCHRONOUS GENERATORS

    Directory of Open Access Journals (Sweden)

    R. I. Mustafayev

    2016-01-01

    Full Text Available Currently, the hydroelectric generating sets of small HPPs with Pelton turbines employ as their generating units conventional synchronous generators with electromagnetic excitation. To deal with the torque pulsatile behaviour, they generally install a supplementary flywheel on the system shaft that levels the pulsations. The Pelton turbine power output is adjusted by the needle changing water flow in the nozzle, whose advancement modifies the nozzle area and eventually – the flow. They limit the needle full stroke time to 20–40 sec. since quick shutting the nozzle for swift water flow reduction may result in pressure surges. For quick power adjustment so-called deflectors are employed, whose task is retraction of water jets from the Pelton turbine buckets. Thus, the mechanical method of power output regulation requires agreement between the needle stroke inside the turbine nozzles and the deflector. The paper offers employing frequency-controlled synchronous machines with permanent magnets qua generating units for the hydroelectric generating sets of small HPPs with Pelton turbines. The developed computer model reveals that this provides a higher level of adjustability towards rapid-changing loads in the grid. Furthermore, this will replace the power output mechanical control involving the valuable deflector drive and the turbine nozzle needles with electrical revolution rate and power output regulation by a frequency converter located in the generator stator circuit. Via frequency start, the controllable synchronous machine ensures stable operation of the hydroelectric generating set with negligibly small amount of water (energy carrier. Finally, in complete absence of water, the frequency-relay start facilitates shifting the generator operation to the synchronous capacitor mode, which the system operating parameter fluctograms obtained through computer modeling prove. 

  4. Assessment of the feasibility of recommissioning the French Landing Hydroelectric Facility in Van Buren Township, Michigan. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    The results of a study of the feasibility of recommissioning a small, low-head hydroelectric facility in southeastern Michigan are presented. The study concludes that there are several cost-effective designs for recommissioning the site, based on the use of vertical turbines and the sale of power to nearby industrial markets. In terms of the bulk sale of power to the local electric utility, no cost-effective alternatives were found to exist. A major burden on project cost-effectiveness was found to be the relatively large costs for structural repairs to the dam and powerhouse needed to insure safe operation and on adequate service life. From an engineering standpoint it was found that the items of equipment needed to recommission the site are readily available from both US and foreign manufacturers. A variety of hydraulic turbine designs could be successfully adapted to the existing powerhouse, without extensive new construction. It was determined that the production capacity of the facility had an important influence on the cost-effectiveness of the project. A detailed benefit/cost analysis was conducted to identify the optimum facility size in terms of incremental costs and revenues. A detailed environmental assessment using an impact matrix methodology concluded that the development of the facility for hydroelectric generation would have important positive environmental consequences related to improved impoundment and flow management techniques as well as enhanced public safety due to structural repairs to the dam. The institutional and regulatory implications of developing the site for hydroelectric generation were found to be significant but manageable.

  5. Analysis of environmental issues related to small-scale hydroelectric development. VI. Dissolved oxygen concentrations below operating dams

    Energy Technology Data Exchange (ETDEWEB)

    Cada, G.F.; Kumar, K.D.; Solomon, J.A.; Hildebrand, S.G.

    1982-01-01

    Results are presented of an effort aimed at determining whether or not water quality degradation, as exemplified by dissolved oxygen concentrations, is a potentially significant issue affecting small-scale hydropower development in the US. The approach was to pair operating hydroelectric sites of all sizes with dissolved oxygen measurements from nearby downstream US Geological Survey water quality stations (acquired from the WATSTORE data base). The USGS data were used to calculate probabilities of non-compliance (PNCs), i.e., the probabilities that dissolved oxygen concentrations in the discharge waters of operating hydroelectric dams will drop below 5 mg/l. PNCs were estimated for each site, season (summer vs remaining months), and capacity category (less than or equal to 30 MW vs >30 MW). Because of the low numbers of usable sites in many states, much of the subsequent analysis was conducted on a regional basis. During the winter months (November through June) all regions had low mean PNCs regardless of capacity. Most regions had higher mean PNCs in summer than in winter, and summer PNCs were greater for large-scale than for small-scale sites. Among regions, the highest mean summer PNCs were found in the Great Basin, the Southeast, and the Ohio Valley. To obtain a more comprehensive picture of the effects of season and capacity on potential dissolved oxygen problems, cumulative probability distributions of PNC were developed for selected regions. This analysis indicates that low dissolved oxygen concentrations in the tailwaters below operating hydroelectric projects are a problem largely confined to large-scale facilities.

  6. Monitoring of surge tanks in hydroelectric power plants using fuzzy control; Ueberwachung von Wasserschloessern in Wasserkraftwerken mit Fuzzy-Control

    Energy Technology Data Exchange (ETDEWEB)

    Lin, J.C.

    2000-07-01

    Surge tanks are used to reduce pressure variations caused by fluid transients in high-head hydroelectric power plants. Occasionally load increases have to be limited to prevent the surge tank from draining due to excessive demands of flow. A control concept based on fuzzy logic was developed for governing the load changes of hydroelectric power plants. In order to achieve an optimal control behaviour and simultaneously to avoid the draining of surge tanks, the speed of load increases is automatically adjusted by a fuzzy conclusion depending on the height and the gradient of the water level in the surge tank, the reservoir level and the sum of load increases. The hydroelectric power plant Achensee of Tiroler Wasserkraftwerke AG in Austria is taken as an example to demonstrate the characteristics of the control concept. In comparison with a conventional control concept, the operation of load increases using the fuzzy concept proves to be more flexible and unrestricted. (orig.) [German] Ein Wasserschloss dient zur Verminderung von Druckschwankungen im Wasserfuehrungssystem von Hochdruckanlagen. Gelegentlich muss man die Lastaufnahme so beschraenken, dass das Wasserschloss nicht durch uebermaessige Wasserentnahme leerlaeuft. Fuer die Leistungsregelung eines Wasserkraftwerks wurde ein Konzept entwickelt, das auf der Fuzzy-Control in Verbindung mit der klassischen Regelung beruht. Um ein optimales Regelverhalten zu erhalten und gleichzeitig das Leerlaufen des Wasserschlosses zu vermeiden, wird die Geschwindigkeit der Lastaufnahme in Abhaengigkeit von der Hoehenkote und dem Gradienten des Wasserschlosspegels, dem Pegel des Oberwassers und der Groesse der geforderten Lasterhoehung automatisch eingestellt. Die Untersuchung erfolgt am Beispiel des Achenseekraftwerkes der Tiroler Wasserkraftwerke AG, Oesterreich. Im Vergleich mit einer konventionellen Regelung ergibt sich mit dem Fuzzy-Konzept eine flexiblere und freizuegigere Lastaufnahme. (orig.)

  7. Anatomical studies on twelve clones of Camellia species with reference to their taxonomic significance

    Directory of Open Access Journals (Sweden)

    Rajanna L

    2010-10-01

    Full Text Available Anatomical studies of leaf and stem of twelve clones of Camellia were investigated. Cross sections of the stem of all the clones exhibited a typical pattern of arrangement of tissues characteristics of woody plants. Two types of idioblastic sclereids were found in the medullary parenchyma of the taxa studied. While astrosclereids werepresent in 10 of the twelve clones, the vesciculose sclereids were found only in the four clones belonging to C. sinensis. Leaves of the clones show variations in the number of palisade layers. Astro sclereids, brachy sclereids, and dendritic forms were observed in the leaves, their distribution varying in the different clones. A few other micromorphological features are also recorded. Our study forms a basis for answering uncertainties in taxonomic revision in the genus Camellia.

  8. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  9. Development of a 1 D hydrodynamic habitat model for the Hippopotamus amphibious as basis for sustainable exploitation of hydroelectric power

    Science.gov (United States)

    Manful, D. Y.; Kaule, G.; Wieprecht, S.; Rees, J.; Hu, W.

    2009-12-01

    Hydroelectric Power (HEP) is proving to be a good alternative to carbon based energy. In the past hydropower especially large scale hydro attracted significant criticism as a result of its impact on the environment. A new breed of hydroelectric dam is in the offing. The aim is to have as little a footprint as possible on the environment in both pre and post construction phases and thus minimize impact on biodiversity whilst producing clean renewable energy. The Bui dam is 400 MW scheme currently under development on the Black Volta River in the Bui national park in Ghana. The reservoir created by the Bui barrage is expected to impact (through inundation) the habitat of two species of hippos know to exist in the park, the Hippopotamus amphibius and the Choeropsis liberiensis. Computer-based models present a unique opportunity to assess quantitatively the impact of the new reservoir on the habitat of the target species in this case the H. amphibious. Until this undertaking, there were very few studies documenting the habitat of the H. amphibious let alone model it. The work and subsequent presentation will show the development of a habitat model for the Hippopotamus amphibius. The Habitat Information retrieval Program based on Streamflow Analysis, in short HIPStrA, is a one dimensional (1D) in-stream, spatially explicit hybrid construct that combines physico-chemical evidence and expert knowledge to forecast river habitat suitability (Hs) for the Hippopotamus amphibius. The version of the model presented is specifically developed to assess the impact of a reservoir created by a hydroelectric dam on potential dwelling areas in the Bui gorge for hippos. Accordingly, this version of HIPStrA simulates a special reservoir suitability index (Rsi), a metric that captures the”hippo friendliness” of any lake or reservoir. The impact of measured and simulated flood events as well as low flows, representing extreme events is also assessed. Recommendations are made for the

  10. Descriptions of twelve new species of ochyroceratids (Araneae, Ochyroceratidae) from mainland Ecuador.

    Science.gov (United States)

    Dupérré, Nadine

    2015-05-12

    Twelve new species in three different genera from the spider family Ochyroceratidae are described from mainland Ecuador: Speocera bioforestae sp. n., Speocera violacea sp. n., Speocera musgo sp. n., Ochyrocera rinocerotos sp. n., Ochyrocera callaina sp. n., Ochyrocera italoi sp. n., Ochyrocera minotaure sp. n., Ochyrocera losrios sp. n., Ochyrocera zabaleta sp. n., Ochyrocera otonga sp. n., Ochyrocera cashcatotoras sp. n. and Psiloochyrocera tortilis sp. n. Speocera machadoi Gertsch 1977 is transferred to Ochyrocera.

  11. A Hidden Twelve-Dimensional SuperPoincare Symmetry In Eleven Dimensions

    Energy Technology Data Exchange (ETDEWEB)

    Bars, Itzhak; Deliduman, Cemsinan; Pasqua, Andrea; Zumino, Bruno

    2003-12-13

    First, we review a result in our previous paper, of how a ten-dimensional superparticle, taken off-shell, has a hidden eleven-dimensional superPoincare symmetry. Then, we show that the physical sector is defined by three first-class constraints which preserve the full eleven-dimensional symmetry. Applying the same concepts to the eleven dimensional superparticle, taken off-shell, we discover a hidden twelve dimensional superPoincare symmetry that governs the theory.

  12. Premarital Sex in the Last Twelve Months and Its Predictors among Students of Wollega University, Ethiopia.

    Science.gov (United States)

    Regassa, Tesfaye; Chala, Dereje; Adeba, Emiru

    2016-07-01

    Premarital sex increases the risk of unintended pregnancy and sexually transmitted infections including HIV if unprotected and contraception is not used. Thus, the objective of this study was to assess premarital sex in the last twelve months and its predictors among regular undergraduate students of Wollega University. A cross-sectional survey using pretested, structured questionnaire was conducted on a total of 704 regular undergraduate students of Wollega University from February to March, 2014. We used multistage sampling technique to recruit study participants. Binary and multivariable logistic regressions were performed using SPSS version 20 to assess predictors of premarital sex. Statistical significance was determined through a 95% confidence level. Wollega University youths who had premarital sex in the last twelve months were 28.4%; 55.5% of them did not use condom during last sex while 31.3% engaged in multiple sex. Being male [Adjusted Odds Ratio (AOR)(95% Confidence Interval(CI))=2.7(1.58-4.75)], age 20-24 years [AOR(95%CI)=2.8(1.13-7.20)], training on how to use condom [AOR(95%CI)=1.7(1.17-2.46)], being tested for HIV [AOR(95%CI)=2.3(1.48-3.53)], using social media frequently [AOR(95%CI)=1.8(1.14-2.88)], having comprehensive knowledge of HIV [AOR(95% CI)=1.5(1.01-2.10)], alcohol use [AOR (95%CI)=2.2(1.31-3.56)] were associated with increased odds of premarital sex in the last twelve months. Nearly one-third of regular undergraduate students of the university were engaged in premarital sex in the last twelve months. Being male, using social media frequently and alcohol use were associated with increased odds of premarital sex in the stated period. Thus, higher institutions have to deliver abstinence messages alongside information about self-protection.

  13. Hidden twelve-dimensional super Poincaré symmetry in eleven dimensions

    CERN Document Server

    Bars, Itzhak; Pasqua, A; Zumino, B; Bars, Itzhak; Deliduman, Cemsinan; Pasqua, Andrea; Zumino, Bruno

    2004-01-01

    First, we review a result in our previous paper, of how a ten-dimensional superparticle, taken off-shell, has a hidden eleven-dimensional superPoincare symmetry. Then, we show that the physical sector is defined by three first-class constraints which preserve the full eleven-dimensional symmetry. Applying the same concepts to the eleven dimensional superparticle, taken off-shell, we discover a hidden twelve dimensional superPoincare symmetry that governs the theory.

  14. Environmental costs associated to the electric generation: hydroelectric versus natural gas thermoelectric; Custos ambientais associados a geracao eletrica: hidreletricas versus termeletricas a gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Reis, Marcelo de Miranda

    2001-01-15

    This works presents the methodologies for valuation of the environmental costs resulting from the main damages of the cycles of electric energy arrange through hydroelectric and natural gas thermoelectric. Initially theoretical concepts are established, embracing: the description of the valuation methodologies, the possible ways of damages internalization in the value of the products, the environmental impacts of hydroelectric and natural gas thermoelectric in these fuel cycles, and the methodologies that can be applied for value the main damages caused by the impacts. Then case studies are developed, with application of the methodologies in the hydroelectric plants of Simplicio and Serra da Mesa, and in the thermoelectric complex composed for RioGen and RioGen Merchant plants. Finally, conclusions and recommendations for a better future application in Brazil of the valuation methodologies are presented. (author)

  15. Numerical dynamic analysis of Chiti single arch dam related to hydroelectric power generation

    Energy Technology Data Exchange (ETDEWEB)

    Abbasi, H. [Islamic Azad Univ., Tehran (Iran, Islamic Republic of); Hosseini, Y.; Jalaly, H. [Ab-Niru Consulting Engineers, Tehran (Iran, Islamic Republic of); Aghajani, K. [Elam Univ., Elam (Iran, Islamic Republic of)

    2006-07-01

    The Chiti dam is a single arch hydroelectric power generation dam located on the Taloogh River in Iran. This paper provided details of the response spectrum method used to design the optimal load conditions and slope of the dam in relation to earthquake protection. The amount of horizontal earthquake acceleration at the dam site was determined based on local calculations of scenarios of an operating basis earthquake (OBE), a maximum design earthquake (MDE) and a maximum credible earthquake (MCE). The response spectrum was defined with 5 per cent damping as the basis of the earthquake calculation. Hydrodynamic pressure was applied in loadings and the dam was analyzed with and without the effect of hydrodynamic pressure. The compressive strength of the concrete was considered as 28 MPa, and the properties of bed rock were determined on geotechnical and geological studies. Hydrodynamic pressure was calculated based on upstream water levels in the reservoir of the arch dam and applied to the model as added mass. The model also considered the weight of the dam body, uplift pressure, and heat changes in stable conditions. The hydrodynamic pressure of water was applied as additional mass to the upstream face of the arch dam. The additional mass was determined based on dam height. The dynamic analysis of the dam was performed using response spectrum data. The model analysis was performed with and without the effect of hydrodynamic pressure. The 3-D model of the dam body was made using the ANSYS finite element program which combined the response spectrum method with temperature load, uplift pressure and water pressure parameters. Results showed that the maximum displacement of the dam body for the various earthquake levels measured was 11.6, 14, and 15.6 mm respectively. The response spectrum analysis performed with hydrodynamic pressure showed displacement values of 22.4, 24.8, and 26.4 mm. Stress and strain values obtained by the model were within allowable amount for

  16. New social movements and political process: The politics of hydroelectric power in Switzerland

    Science.gov (United States)

    Lehmann, Luzia M.

    This dissertation analyzes the mobilization and impact of the ecology movement mobilizing against and challenging hydroelectric power plants in the Alps. It argues that the political process model is the most fruitful framework for such a study, linking a political system's structural constraints and opportunities to movement action via organizational resources. The mobilization process resulting in movement impact is conceived as an interactive process among social movements, authorities, other opponents, and potential counter movements. The case study method is then used to analyze three action campaigns launched against hydro power plants in Graubunden since the 1970s: Ilanz I and II, Greina, and Curciusa. In terms of the movement's narrow goal of preventing a plant, Ilanz I and II is a failure, Greina a success, and Curciusa ambiguous. Yet the author defines movement impact more broadly, including procedural, reactive and proactive substantive impact, and structural impact, changes in the alliance/conflict system, and social learning. Based on the evidence from the case studies, these factors affect movement outcome positively: visibility in the media and framing the debate, adjusting the target level and movement repertoire to the opportunity structure and the spatial concentration of the issue, proactivity, and organizational resources with a well developed division of labor, internal communication, and a non-partisan alliance system at all levels. There are two main conceptual contributions. First, the author analyzes the political opportunity structure at all levels of the federal polity--the national, cantonal, and communal--as well as the interplay among the levels. The fact that the cantonal and communal levels exhibit more elements of closure than the national level helps explain differences in movements' organizational resources, movement repertoire, targeting of movement action, and thus movement impact. Second, the author develops the spatial

  17. Report on the development perspectives of the hydroelectric production in France; Rapport sur les perspectives de developpement de la production hydroelectrique en France

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-03-15

    This report, presented to the Ministry of the Economy, the Finances and the Industry, has been realized by the high ranking of the sustainable development of the Ministry. It presents the synthesis of the working group study at the second half year 2005 and proposes to the Ministry some practical actions to develop the hydroelectric production in France. After a presentation of the hydro electric-power challenges and potential, the author discusses the regulatory context of the hydroelectric power development, the conditions of this development and proposes some actions. (A.L.B.)

  18. Success factors for the hydroelectric power plants reformation: engineering and work planning; Fatores de sucesso para reforma de usinas hidreletricas. Engenharia e planejamento das obras

    Energy Technology Data Exchange (ETDEWEB)

    Nakamura, George; Amaral, Luiz Antonio Franco do; Campos, Jose Ayres de; Campos, Maria Tereza F.R. de [CNEC Engenharia S.A., Sao Paulo, SP (Brazil)]. E-mail: jayres@cnec.com.br

    2000-07-01

    The detailed description of the interventions in the power plant involving the diagnosis, project, specifications, acquisition, prior assembly, units shutdown, remounting, tests, operation, etc, based on data bases an solid information, are vital factors for the success of the reformation work of hydroelectric power plants. The main activities to be developed are: implantation integrated through the project interfaces management; characterization of critical path of the works; description and characterization of the power plant intervention stages. This paper generically describes this technology, based on the CNEC engineering company studies on hydroelectric power plants reformation.

  19. Evaluation for turbine implementation for a micro hydroelectric power plant; Avaliacao para implantacao de uma turbina para uma microcentral hidreletrica

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Gilberto Manoel; Halmeman, Maria Cristina Rodrigues; Oliveira, Franciene Gois [Universidade Estadual Paulista (UNESP), Botucatu, SP (Brazil). Programa de Pos-graduacao em Energia na Agricultura; Seraphim, Odivaldo Jose [Universidade Estadual Paulista (UNESP), Botucatu, SP (Brazil). Dep. de Engenharia Rural

    2008-07-01

    In this work it was analyzed the viability technical and economical of turbines to micro hydroelectric headquarters as an alternative to consumers not served by electric energy in isolated areas. It was used a experimental methods to create an estimative and a evaluation of the hydroelectric potential, through hydrological criteria in the area and, thus, be able to note if there is viability for its use. Some kinds of turbines made by the national industry were verified, analyzing the technical and economical characteristics and in function of the hydro energetic-conditions of the area. The results shoed that a micro-headquarters serves the necessities and expectations of the owner at the electric energy supply. It was noted that the expenses are smaller comparing to the other expenses know in the literature, from national factories. Even though the limiting factor is the distance from the production to the consumer, the potency of 18.4 kw was enough to satisfy the local necessities. The installation of de micro headquarters will bring enhances and facilities by the fact that it represents a big social importance for the area. (author)

  20. The impacts of wind power integration on sub-daily variation in river flows downstream of hydroelectric dams.

    Science.gov (United States)

    Kern, Jordan D; Patino-Echeverri, Dalia; Characklis, Gregory W

    2014-08-19

    Due to their operational flexibility, hydroelectric dams are ideal candidates to compensate for the intermittency and unpredictability of wind energy production. However, more coordinated use of wind and hydropower resources may exacerbate the impacts dams have on downstream environmental flows, that is, the timing and magnitude of water flows needed to sustain river ecosystems. In this paper, we examine the effects of increased (i.e., 5%, 15%, and 25%) wind market penetration on prices for electricity and reserves, and assess the potential for altered price dynamics to disrupt reservoir release schedules at a hydroelectric dam and cause more variable and unpredictable hourly flow patterns (measured in terms of the Richards-Baker Flashiness (RBF) index). Results show that the greatest potential for wind energy to impact downstream flows occurs at high (∼25%) wind market penetration, when the dam sells more reserves in order to exploit spikes in real-time electricity prices caused by negative wind forecast errors. Nonetheless, compared to the initial impacts of dam construction (and the dam's subsequent operation as a peaking resource under baseline conditions) the marginal effects of any increased wind market penetration on downstream flows are found to be relatively minor.

  1. Hydroelectric power generation in an Alpine basin: future water-energy scenarios in a run-of-the-river plant

    Science.gov (United States)

    Bongio, Marco; Avanzi, Francesco; De Michele, Carlo

    2016-08-01

    We investigate scenarios of hydroelectric power generation for an Alpine run-of-the-river plant in 2050. To this end, we include a conversion from streamflow to energy in a hydrological model of the basin, and we introduce a set of benchmark climate scenarios to evaluate expected future production. These are a "future-like-present" scenario assuming future precipitation and temperature inputs to be statistically equivalent to those observed during the recent past at the same location, a "warmer-future" scenario, which considers an additional increase in temperature, and a "liquid-only" scenario where only liquid precipitation is admitted. In addition, two IPCC-like climatic scenarios (RCP 4.5 and RCP 8.5) are considered. Uncertainty in glaciers' volume is accounted by initializing the hydrological model with two different inventories of glaciers. Ensemble results reveal that 1) an average decrease between -40% and -19% of hydroelectric power generation in 2050 is predicted at the plant considered (with respect to present condition); 2) an average decrease between -20% and -38% of cumulative incoming streamflow volume at the plant is also predicted, again with respect to present condition; 3) these effects are associated with a strong average decrease of the volume of glaciers (between -76% and -96%, depending on the initial value considered). However, Monte Carlo simulations show that results are also prone to high uncertainties. Implications of these results for run-of-the-river plants are discussed.

  2. Further tests of changes in fish escape behavior resulting from sublethal stresses associated with hydroelectric turbine passage

    Energy Technology Data Exchange (ETDEWEB)

    Ryon, Michael G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cada, Glenn F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Smith, John G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2004-04-01

    Fish that pass through a hydroelectric turbine may not be killed directly, but may nonetheless experience sublethal stresses that will increase their susceptibility to predators (indirect mortality). There is a need to develop reliable tests for indirect mortality so that the full consequences of passage through turbines (and other routes around a hydroelectric dam) can be assessed. The most commonly used laboratory technique for assessing susceptibility to predation is the predator preference test. This report evaluates the field application of a new technique that may be valuable for assessing indirect mortality, based on changes in a behavioral response to a startling stimulus (akin to perceiving an approaching predator). The study compared the behaviors of 70 fish passed through the turbine and another 70 under control conditions (either transferred from the holding tank or injected into the Alden loop downstream of turbine). The resulting image files were analyzed for a variety of behavioral measures including: presence of a startle response, time to first reaction, duration of reaction, time to formation of the maximum C-shape, time to completion of the C-shape, completeness of the C-shape, direction of turn, and degree of turn. The data were evaluated for statistical significance and patterns of response were identified.

  3. Definition of a Twelve-Point Polygonal SAA Boundaryfor the GLAST Mission

    Energy Technology Data Exchange (ETDEWEB)

    Djomehri, Sabra I.; /UC, Santa Cruz /SLAC

    2007-08-29

    The Gamma-Ray Large Area Space Telescope (GLAST), set to launch in early 2008, detects gamma rays within a huge energy range of 100 MeV - 300 GeV. Background cosmic radiation interferes with such detection resulting in confusion over distinguishing cosmic from gamma rays encountered. This quandary is resolved by encasing GLAST's Large Area Telescope (LAT) with an Anti-Coincidence Detector (ACD), a device which identifies and vetoes charged particles. The ACD accomplishes this through plastic scintillator tiles; when cosmic rays strike, photons produced induce currents in Photomultiplier Tubes (PMTs) attached to these tiles. However, as GLAST orbits Earth at altitudes {approx}550km and latitudes between -26 degree and 26 degree, it will confront the South Atlantic Anomaly (SAA), a region of high particle flux caused by trapped radiation in the geomagnetic field. Since the SAA flux would degrade the sensitivity of the ACD's PMTs over time, a determined boundary enclosing this region need be attained, signaling when to lower the voltage on the PMTs as a protective measure. The operational constraints on such a boundary require a convex SAA polygon with twelve edges, whose area is minimal ensuring GLAST has maximum observation time. The AP8 and PSB97 models describing the behavior of trapped radiation were used in analyzing the SAA and defining a convex SAA boundary of twelve sides. The smallest possible boundary was found to cover 14.58% of GLAST's observation time. Further analysis of defining a boundary safety margin to account for inaccuracies in the models reveals if the total SAA hull area is increased by {approx}20%, the loss of total observational area is < 5%. These twelve coordinates defining the SAA flux region are ready for implementation by the GLAST satellite.

  4. The correlation between reading and mathematics ability at age twelve has a substantial genetic component.

    Science.gov (United States)

    Davis, Oliver S P; Band, Gavin; Pirinen, Matti; Haworth, Claire M A; Meaburn, Emma L; Kovas, Yulia; Harlaar, Nicole; Docherty, Sophia J; Hanscombe, Ken B; Trzaskowski, Maciej; Curtis, Charles J C; Strange, Amy; Freeman, Colin; Bellenguez, Céline; Su, Zhan; Pearson, Richard; Vukcevic, Damjan; Langford, Cordelia; Deloukas, Panos; Hunt, Sarah; Gray, Emma; Dronov, Serge; Potter, Simon C; Tashakkori-Ghanbaria, Avazeh; Edkins, Sarah; Bumpstead, Suzannah J; Blackwell, Jenefer M; Bramon, Elvira; Brown, Matthew A; Casas, Juan P; Corvin, Aiden; Duncanson, Audrey; Jankowski, Janusz A Z; Markus, Hugh S; Mathew, Christopher G; Palmer, Colin N A; Rautanen, Anna; Sawcer, Stephen J; Trembath, Richard C; Viswanathan, Ananth C; Wood, Nicholas W; Barroso, Ines; Peltonen, Leena; Dale, Philip S; Petrill, Stephen A; Schalkwyk, Leonard S; Craig, Ian W; Lewis, Cathryn M; Price, Thomas S; Donnelly, Peter; Plomin, Robert; Spencer, Chris C A

    2014-07-08

    Dissecting how genetic and environmental influences impact on learning is helpful for maximizing numeracy and literacy. Here we show, using twin and genome-wide analysis, that there is a substantial genetic component to children's ability in reading and mathematics, and estimate that around one half of the observed correlation in these traits is due to shared genetic effects (so-called Generalist Genes). Thus, our results highlight the potential role of the learning environment in contributing to differences in a child's cognitive abilities at age twelve.

  5. New Eyes on the Universe Twelve Cosmic Mysteries and the Tools We Need to Solve Them

    CERN Document Server

    Webb, Stephen

    2012-01-01

    "New Eyes on the Universe -- Twelve Cosmic Mysteries and the Tools We Need to Solve Them" gives an up-to-date broad overview of some of the key issues in modern astronomy and cosmology. It describes the vast amount of observational data that the new generation of observatories and telescopes are currently producing, and how that data might solve some of the outstanding puzzles inherent in our emerging world view. Included are questions such as: What is causing the Universe to blow itself apart? What could be powering the luminous gamma-ray bursters? Where is all the matter in the Uni

  6. DETECTION OF CHROMOSOME ABERRATIONS IN TWELVE PRIMARY GASTRIC CANCERS BY DIRECT CHROMOSOME ANALYSIS AND FISH

    Institute of Scientific and Technical Information of China (English)

    1999-01-01

    Direct chromosome analysis and FISH were performed on twelve primary gastric carcinomas. Two of them had simple chromosome changes: 48,XX, +8, +20, and 49, XY, +2, +8, +9, and the others had complicated chromosome changes, which includes much more numerical and structural chromosome aberrations. Frequent structural changes in the complicated types involved chromosome 7, 3, 1, 5 and 12 etc. The del 7q was noted in eight cases. The del (3p) and del (1p) were noted in six and five cases, respectively. The results provide some important clues for isolation of the genes related to gastric cancer.

  7. Developing a learning culture: twelve tips for individuals, teams and organizations.

    Science.gov (United States)

    Stinson, Lynn; Pearson, David; Lucas, Beverley

    2006-06-01

    A culture of learning in providing health services and education for health professionals is a constant challenge for individuals, team and organizations. The importance of such a culture was highlighted by the findings of the Bristol Royal Infirmary Inquiry (2001). This was discussed in the context of the literature on the Learning Organization (Senge, 1990) at the 2004 Association of Medical Education in Europe (AMEE) conference, and reviewed a year later at the 2005 AMEE conference. This paper outlines twelve tips for educational and health service organizations in facilitating a culture of learning for their members and also offers specific advice to individual students and professionals.

  8. Malaria and water resource development: the case of Gilgel-Gibe hydroelectric dam in Ethiopia

    Directory of Open Access Journals (Sweden)

    Kloos Helmut

    2009-01-01

    Full Text Available Abstract Background Ethiopia plans to increase its electricity power supply by five-fold over the next five years to fulfill the needs of its people and support the economic growth based on large hydropower dams. Building large dams for hydropower generation may increase the transmission of malaria since they transform ecosystems and create new vector breeding habitats. The aim of this study was to assess the effects of Gilgel-Gibe hydroelectric dam in Ethiopia on malaria transmission and changing levels of prevalence in children. Methods A cross-sectional, community-based study was carried out between October and December 2005 in Jimma Zone, south-western Ethiopia, among children under 10 years of age living in three 'at-risk' villages (within 3 km from dam and three 'control' villages (5 to 8 km from dam. The man-made Gilgel-Gibe dam is operating since 2004. Households with children less than 10 years of age were selected and children from the selected households were sampled from all the six villages. This included 1,081 children from 'at-risk' villages and 774 children from 'control' villages. Blood samples collected from children using finger prick were examined microscopically to determine malaria prevalence, density of parasitaemia and identify malarial parasite species. Results Overall 1,855 children (905 girls and 950 boys were surveyed. A total of 194 (10.5% children were positive for malaria, of which, 117 (60.3% for Plasmodium vivax, 76 (39.2% for Plasmodium falciparum and one (0.5% for both P. vivax and P. falciparum. A multivariate design-based analysis indicated that, while controlling for age, sex and time of data collection, children who resided in 'at-risk' villages close to the dam were more likely to have P. vivax infection than children who resided farther away (odds ratio (OR = 1.63, 95% CI = 1.15, 2.32 and showed a higher OR to have P. falciparum infection than children who resided in 'control' villages, but this was not

  9. Model for analysis and definition of the governor constants in hydroelectric power; Modelo para analise e definicao das constantes do regulador em usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Jose Geraldo Pena de; Koelle, Edmundo; Luvizotto Junior, Edevar [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Civil. Dept. de Hidraulica e Saneamento

    1997-07-01

    This paper presents a complete mathematical and computer model which allows simulating a generic hydroelectric power plant under steady state and transitory regimes, in the extensive time, and also the analysis of the oscillating flows resulting from excitation sources present in the installation, such as vortices in the suction pipe during partial load operation.

  10. Risk factors for the presence of Aedes aegypti and Aedes albopictus in domestic water-holding containers in areas impacted by the Nam Theun 2 hydroelectric project, Laos

    NARCIS (Netherlands)

    Hiscox, A.F.; Kaye, A.; Vongphayloth, K.; Banks, I.; Piffer, M.; Khammanithong, P.; Sananikhom, P.; Kaul, S.; Hill, N.; Lindsay, S.W.; Brey, P.T.

    2013-01-01

    We assessed risk factors for vectors of dengue and chikungunya viruses near a new hydroelectric project, Nam Theun 2, in Laos. Immature stages of Aedes aegypti were found only in sites within 40 km of the urban provincial capital, but Aedes albopictus was found throughout. Aedes aegypti pupae were m

  11. Risk factors for the presence of Aedes aegypti and Aedes albopictus in domestic water-holding containers in areas impacted by the Nam Theun 2 hydroelectric project, Laos

    NARCIS (Netherlands)

    Hiscox, A.F.; Kaye, A.; Vongphayloth, K.; Banks, I.; Piffer, M.; Khammanithong, P.; Sananikhom, P.; Kaul, S.; Hill, N.; Lindsay, S.W.; Brey, P.T.

    2013-01-01

    We assessed risk factors for vectors of dengue and chikungunya viruses near a new hydroelectric project, Nam Theun 2, in Laos. Immature stages of Aedes aegypti were found only in sites within 40 km of the urban provincial capital, but Aedes albopictus was found throughout. Aedes aegypti pupae were

  12. Social and political implications of great hydroelectric projects on the native and country population; Implicacoes politicas e sociais de grandes projetos hidroeletricos sobre as populacoes indigenas e camponesas

    Energy Technology Data Exchange (ETDEWEB)

    Sigaud, Lygia [Rio de Janeiro Univ., RJ (Brazil). Museu Nacional

    1993-03-01

    The power generation policy adopted in Brazil for the construction of large hydroelectric power plants and its social impacts are analysed. It is stressed the importance of the participation of the society in the definition of this policy. This can be achieved now with the re democratization of the country and a more active participation of the people in the future of the nation.

  13. [Experience in organization of joint actions of expert divisions during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station].

    Science.gov (United States)

    Kolkutin, V V; Ivanov, P L; Fetisov, V A; Afanas'ev, S A; Dorozhkin, O A; Vognerubov, R N; Kuznetsov, T L

    2010-01-01

    The authors illustrate positive experience in organization and coordination of joint actions of expert divisions of different sectors during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station in August 2009. Special emphasis is laid on the participation of experts of quick-reaction teams formed by territorial forensic medical bureaus, mobile and supporting forces from the adjacent regions.

  14. Risk factors for the presence of Aedes aegypti and Aedes albopictus in domestic water-holding containers in areas impacted by the Nam Theun 2 hydroelectric project, Laos

    NARCIS (Netherlands)

    Hiscox, A.F.; Kaye, A.; Vongphayloth, K.; Banks, I.; Piffer, M.; Khammanithong, P.; Sananikhom, P.; Kaul, S.; Hill, N.; Lindsay, S.W.; Brey, P.T.

    2013-01-01

    We assessed risk factors for vectors of dengue and chikungunya viruses near a new hydroelectric project, Nam Theun 2, in Laos. Immature stages of Aedes aegypti were found only in sites within 40 km of the urban provincial capital, but Aedes albopictus was found throughout. Aedes aegypti pupae were m

  15. Rescue and preservation of Serra da Mesa hydroelectric power plant flora; Salvamento e conservacao da flora de UHE Serra da Mesa

    Energy Technology Data Exchange (ETDEWEB)

    Santos, H.G.P.; Silva, S.P.C. da [FURNAS, Rio de Janeiro, RJ (Brazil); Walter, B.M.T. [Empresa Brasileira de Pesquisa Agropecuaria, (Brazil). CENARGEN

    1993-12-31

    This report shows what is being doing to rescue and preserve the flora affected by the construction of the Serra da Mesa hydroelectric power plant. A survey concerning the existent flora on the area influenced by the undertaking is proceeded and the first results of such survey are here presented 5 refs., 2 tabs.

  16. Work environment perceptions following relocation to open-plan offices: A twelve-month longitudinal study.

    Science.gov (United States)

    Bergström, Jessica; Miller, Michael; Horneij, Eva

    2015-01-01

    A workplace's design can have various positive or negative effects on the employees and since the 1970s the advantages and disadvantages of open-plan offices have been discussed. The aim of this study was to investigate perceived health, work environment and self-estimated productivity one month before and at three, six and twelve months after relocation from individual offices to an open-plan office environment. Employees from three departments within the same company group and who worked with relatively similar tasks and who were planned to be relocated from private offices to open-plan offices were invited to participate. Questionnaires comprising items from The Salutogenic Health Indicator Scale, The Work Experience Measurement Scale, the questionnaire by Brennan et al. about perceived performance and one question from the Work Ability Index were sent to participants one month before relocation (baseline) to open-plan offices and then at three, six and twelve months after relocation. At baseline, 82 questionnaires were sent out. The response rate was 85%. At the follow-ups 77-79 questionnaires were sent out and the response-rate was 70%-81%. At follow-ups, perceived health, job satisfaction and performance had generally deteriorated. The results of the study indicate that employees' perception of health, work environment and performance decreased during a 12 month period following relocation from individual offices to open-plan offices.

  17. Approximate analytic method for high-apogee twelve-hour orbits of artificial Earth's satellites

    Science.gov (United States)

    Vashkovyaka, M. A.; Zaslavskii, G. S.

    2016-09-01

    We propose an approach to the study of the evolution of high-apogee twelve-hour orbits of artificial Earth's satellites. We describe parameters of the motion model used for the artificial Earth's satellite such that the principal gravitational perturbations of the Moon and Sun, nonsphericity of the Earth, and perturbations from the light pressure force are approximately taken into account. To solve the system of averaged equations describing the evolution of the orbit parameters of an artificial satellite, we use both numeric and analytic methods. To select initial parameters of the twelve-hour orbit, we assume that the path of the satellite along the surface of the Earth is stable. Results obtained by the analytic method and by the numerical integration of the evolving system are compared. For intervals of several years, we obtain estimates of oscillation periods and amplitudes for orbital elements. To verify the results and estimate the precision of the method, we use the numerical integration of rigorous (not averaged) equations of motion of the artificial satellite: they take into account forces acting on the satellite substantially more completely and precisely. The described method can be applied not only to the investigation of orbit evolutions of artificial satellites of the Earth; it can be applied to the investigation of the orbit evolution for other planets of the Solar system provided that the corresponding research problem will arise in the future and the considered special class of resonance orbits of satellites will be used for that purpose.

  18. Global surface temperature change analysis based on MODIS data in recent twelve years

    Science.gov (United States)

    Mao, K. B.; Ma, Y.; Tan, X. L.; Shen, X. Y.; Liu, G.; Li, Z. L.; Chen, J. M.; Xia, L.

    2017-01-01

    Global surface temperature change is one of the most important aspects in global climate change research. In this study, in order to overcome shortcomings of traditional observation methods in meteorology, a new method is proposed to calculate global mean surface temperature based on remote sensing data. We found that (1) the global mean surface temperature was close to 14.35 °C from 2001 to 2012, and the warmest and coldest surface temperatures of the global in the recent twelve years occurred in 2005 and 2008, respectively; (2) the warmest and coldest surface temperatures on the global land surface occurred in 2005 and 2001, respectively, and on the global ocean surface in 2010 and 2008, respectively; and (3) in recent twelve years, although most regions (especially the Southern Hemisphere) are warming, global warming is yet controversial because it is cooling in the central and eastern regions of Pacific Ocean, northern regions of the Atlantic Ocean, northern regions of China, Mongolia, southern regions of Russia, western regions of Canada and America, the eastern and northern regions of Australia, and the southern tip of Africa. The analysis of daily and seasonal temperature change indicates that the temperature change is mainly caused by the variation of orbit of celestial body. A big data model based on orbit position and gravitational-magmatic change of celestial body with the solar or the galactic system should be built and taken into account for climate and ecosystems change at a large spatial-temporal scale.

  19. Comparative assay of fluorescent antibody test results among twelve European National Reference Laboratories using various anti-rabies conjugates

    DEFF Research Database (Denmark)

    Robardet, E.; Andrieu, S.; Rasmussen, Thomas Bruun

    2013-01-01

    Twelve National Reference Laboratories (NRLs) for rabies have undertaken a comparative assay to assess the comparison of fluorescent antibody test (FAT) results using five coded commercial anti-rabies conjugates (Biorad, Bioveta, Fujirebio, Millipore, and SIFIN conjugates). Homogenized positive...

  20. Feasibility of restoring the Greggs Falls site to active service as a low-head hydroelectric facility

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, Jr., Robert W.

    1979-08-16

    A study was conducted to determine the feasibility of restoring to service the deactivated Greggs Falls hydroelectric station in Goffstown, New Hampshire. Evaluation of technical, economic, legal, institutional, and environmental factors led to the conclusion that restoration was both feasible and attractive. The site can be restored for an investment of $2.1 to $2.4 million (depending on the operational mode) to establish 1.5 MW of capacity and produce 7945 MWh of electrical energy annually. Within 3 years, operation of the site can produce energy at lower costs than the cost of fuel oil in New England and will save approximately 14,600 barrels of fuel oil annually. The economic competitiveness of the facility is expected to improve with time because of the rising price of imported oil.

  1. [Analysis of the social and health impacts of large hydroelectric plants: lessons for a sustainable energy management].

    Science.gov (United States)

    de Queiroz, Adriana Renata Sathler; Motta-Veiga, Marcelo

    2012-06-01

    The main objective of this study was to analyze the social and health impacts resulting from the construction of the Tucuruí (Pará, Brazil) and James Bay (Quebec, Canada) Hydroelectric Plants. The comparative method study used in analysis of the literature review revealed lessons to be learned from the national and international experience in order to ensure sustainable management of future major energy projects in Brazil. In this study, a successive negative domino effect was observed in terms of social impacts on jobs, income, sanitation, and culture, all with associated health problems. These included stress, nutritional and psychosocial disturbances, cardiopathies, as well as respiratory and digestive problems. The actions seeking to mitigate the effects of these negative impacts were slow to be implemented. Moreover, even though three decades have elapsed, these actions proved inefficient to resolve all the health and socio-environmental problems caused.

  2. Analysis of environmental issues related to small-scale hydroelectric development IV: fish mortality resulting from turbine passage

    Energy Technology Data Exchange (ETDEWEB)

    Turbak, S. C.; Reichle, D. R.; Shriner, C. R.

    1981-01-01

    This document presents a state-of-the-art review of literature concerning turbine-related fish mortality. The review discusses conventional and, to a lesser degree, pumped-storage (reversible) hydroelectric facilities. Much of the research on conventional facilities discussed in this report deals with studies performed in the Pacific Northwest and covers both prototype and model studies. Research conducted on Kaplan and Francis turbines during the 1950s and 1960s has been extensively reviewed and is discussed. Very little work on turbine-related fish mortality has been undertaken with newer turbine designs developed for more modern small-scale hydropower facilities; however, one study on a bulb unit (Kaplan runner) has recently been released. In discussing turbine-related fish mortality at pumped-storage facilities, much of the literature relates to the Ludington Pumped Storage Power Plant. As such, it is used as the principal facility in discussing research concerning pumped storage.

  3. Reliability of hydroelectric generation components, systems and units; Confiabilidad de componentes, sistemas y unidades de generacion hidroelectrica

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Sanchez, Ramon; Torres Toledano, Gerardo; Franco Nava, Jose Manuel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1996-12-31

    This article presents a methodology for the calculation of the reliability of components, systems and hydroelectric generating units, as well as the scope of a computational system for the evaluation of such reliability. In the case of the reliability calculation of components and systems, the computer programs is not limited to hydro stations and can be used in other type of systems. [Espanol] En este articulo se presenta una metodologia para calcular la confiabilidad de componentes, sistemas y unidades de generacion hidroelectrica, asi como el alcance de un sistema computacional para evaluar dicha confiabilidad. En el caso del calculo de confiabilidad de componentes y sistemas, el programa de computo no se limita a centrales hidroelectricas y puede utilizarse en otro tipo de sistemas.

  4. HydroHelp 5 : an excel program developed for pre-feasibility assessment of pump-storage hydroelectric sites

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, J.L.

    2009-01-15

    A series of programs known as HydroHelp have been developed in order to help engineers obtain an initial assessment of a hydro site, with minimum site data. All programs within the series use Microsoft Office, Excel 2003 on Windows XP. This paper presented the HydroHelp software that was developed for the pre-feasibility assessment of pump-storage hydroelectric sites. The paper presented the data input sheet for a pump-turbine project which included detailed instructions on program operation. A schematic of underground work was also provided. The paper reviewed calculations performed by the program, including all basic structure dimensions ranging from reservoir wave heights and the corresponding average rip-rap size on the dam, to the capacity of the powerhouse crane. Cost estimates and a cost summary report were also presented. tabs., figs.

  5. Floristic and phytosociology in dense "terra firme" rainforest in the Belo Monte Hydroelectric Plant influence area, Pará, Brazil.

    Science.gov (United States)

    Lemos, D A N; Ferreira, B G A; Siqueira, J D P; Oliveira, M M; Ferreira, A M

    2015-08-01

    The objective of the present study was to characterise the floristic and phytosociological composition on a stretch of dense "Terra Firme" rainforest located in the Belo Monte hydroelectric plant area of influence, located in the state of Pará, Brazil. All trees with DAP >10 cm situated in 75 permanent plots of 1 ha were inventoried. 27,126 individuals trees (361 ind.ha-1), distributed in 59 botanical families, comprising 481 species were observed. The families with the largest number of species were Fabaceae (94), Araceae (65) and Arecaceae (43), comprising 43.7% of total species. The species Alexa grandiflora (4.41), Cenostigma tocantinum (2.50) and Bertholletia excelsa (2.28) showed the highest importance values (IV). The ten species with greater IV are concentrated (22%). The forest community has high species richness and can be classified as diverse age trees, heterogeneous and of medium conservation condition.

  6. Badenian and Sarmatian beds in excavation pit for the hydroelectric power plant Brežice, Slovenia

    Directory of Open Access Journals (Sweden)

    Marijan Poljak

    2016-12-01

    Full Text Available Geological prospection of partly accessible constructional pit for the hydroelectric power plant (HPP Brežice was performed. Paleontological content and sediment-petrographic characteristics of rocks were investigated. Neogene part of the succession consists of carbonate silt and siltstone with intercalations of carbonate and silicate sandstone, and polymict sandstone to conglomerate. Based on foraminifera, ostracods, molluscs and marine mammals, the Upper Badenian and Lower Sarmatian age of beds and boundary between them have been determined. The transition is characterized by a shorter break in sedimentation and environmental change. Fossil fids indicate that salinity and depth of sedimentary basin were oscilating in Sarmatian, but in general decreasing. Quaternary cover beds consist of gravelly, sandy and silty deposits of the Sava River.

  7. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development V: Instream Flow Needs for Fishery Resources

    Energy Technology Data Exchange (ETDEWEB)

    Loar, James M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sale, Michael J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1981-10-01

    The purpose of this document is to provide guidance to developers of small-scale hydroelectric projects on the assessment of instream flow needs. While numerous methods have been developed to assess the effects of stream flow regulation on aquatic biota in coldwater streams in the West, no consensus has been reached regarding their general applicability, especially to streams in the eastern United States. This report presents and reviews these methods (Section 2.0), which is intended to provide the reader with general background information that is the basis for the critical evaluation of the methods (Section 3.0). The strategy for instream flow assessment presented in Section 4.0 is, in turn, based on the implicit assumptions, data needs, costs, and decision-making capabilities of the various methods as discussed in Section 3.0.

  8. Spatial-temporal dynamics and sources of total Hg in a hydroelectric reservoir in the Western Amazon, Brazil.

    Science.gov (United States)

    Pestana, I A; Bastos, W R; Almeida, M G; de Carvalho, D P; Rezende, C E; Souza, C M M

    2016-05-01

    Damming rivers to construct hydroelectric reservoirs results in a series of impacts on the biogeochemical Hg cycle. For example, modifying the hydrodynamics of a natural watercourse can result in the suspension and transport of Hg deposits in the water column, which represents an exposure risk for biota. The objective of this study was to evaluate the influences of seasonality on the dispersion of total Hg in the Hydroelectric Power Plant (HPP)-Samuel Reservoir (Porto Velho/Brazil). Sampling campaigns were performed during the three following hydrological periods characteristic of the region: low (Oct/2011), ebbing (May/2012), and high (Feb/2013) water. Sediment profiles, suspended particulate matter (SPM), and aquatic macrophytes (Eicchornia crassipes and Oryza spp.) were collected, and their Hg concentrations and isotopic and elemental C and N signatures were determined. The drainage basin significantly influenced the SPM compositions during all the periods, with a small autochthonous influence from the reservoir during the low water. The highest SPM Hg concentrations inside the reservoir were observed during the high water period, suggesting that the hydrodynamics of this environment favor the suspension of fine SPM, which has a higher Hg adsorption capacity. The Hg concentrations in the sediment profiles were ten times lower than those in the SPM, indicating that large particles with low Hg concentrations were deposited to form the bottom sediment. Hg concentrations were higher in aquatic macrophyte roots than in their leaves and appeared to contribute to the formation of SPM during the low water period. In this environment, Hg transport mainly occurs in SPM from the Jamari River drainage basin, which is the primary source of Hg in this environment.

  9. Wildlife and Wildlife Habitat Loss Assessment Summary at Federal Hydroelectric Facilities; Willamette River Basin, 1985 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, J.H.

    1986-02-01

    Habitat based assessments were conducted of the US Army Corps of Engineers' hydroelectric projects in the Willamette River Basin, Oregon, to determine losses or gains to wildlife and/or wildlife habitat resulting from the development and operation of the hydroelectric-related components of the facilities. Preconstruction, postconstruction, and recent vegetation cover types at the project sites were mapped based on aerial photographs. Vegetation cover types were identified within the affected areas and acreages of each type at each period were determined. Wildlife target species were selected to represent a cross-section of species groups affected by the projects. An interagency team evaluated the suitability of the habitat to support the target species at each project for each time period. An evaluation procedure which accounted for both the quantity and quality of habitat was used to aid in assessing impacts resulting from the projects. The Willamette projects extensively altered or affected 33,407 acres of land and river in the McKenzie, Middle Fork Willamette, and Santiam river drainages. Impacts to wildlife centered around the loss of 5184 acres of old-growth conifer forest, and 2850 acres of riparian hardwood and shrub cover types. Impacts resulting from the Willamette projects included the loss of critical winter range for black-tailed deer and Roosevelt elk, and the loss of year-round habitat for deer, upland game birds, furbearers, spotted owls, pileated woodpeckers, and many other wildlife species. Bald eagles and ospreys were benefited by an increase in foraging habitat. The potential of the affected areas to support wildlife was greatly altered as a result of the Willamette projects. Losses or gains in the potential of the habitat to support wildlife will exist over the lives of the projects. Cumulative or system-wide impacts of the Willamette projects were not quantitatively assessed.

  10. THE SIGNIFICANCE OF STRUCTURAL AND GEOLOGICAL RELATIONSHIP ASSESSMENT IN THE CONSTRUCTION OF THE OMBLA UNDERGROUND HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Renato Buljan

    1997-12-01

    Full Text Available The construction design of the underground hydroelectric plant Ombla required geological and structural investigations to he carried out. Due to past earthquakes in the area permanent tectonic movements were inferred. Therefore, in the wider and adjacent surroundings of the Ombla spring it was necessary to analyze the structural fabric and the geodynamic characteristics of the area. The most active zone encountered is the front part of a thrust fault belonging to the Dinaricum regional structural unit. The compressive regime is maintained as a response to the regional stress of an approximately S-N orientation. Different displacements of various parts of the Dinaricum unit are present. Along the rim of the structural blocks, the Hum-Om-bla fault zone extends, accompanied by left transcurrent faults, Through this zone the main groundwater drainage occurs supplying the Ombla spring. In the local Ombla spring area this zone is characterized by three sub-blocks and three major faults. The most important fault for the vital facilities of the Ombla hydroelectric power plant is the Pločice fault which divides the structural sub-blocks. Along this fault zone there are four mutually connected. The lowest two arc active groundwater draining systems supplying the Ombla spring. The data on local stress implies the following deformation of sub-blocks: sub-blocks 2c and 2f are displaced along normal faults from 20° to 30° to the left, downwards, while the sub-block 2 d is displaced along the Pločice thrust fault of 100° to 130° to the left, upwards. The structural data confirmed that the building of an underground dam with a height from 100 to 130 m was feasible. The connection between the caverns and the fault zone was determined. The unfavorable position of the active Pločice fault zone imposes the construction of vital Ombla power plant facilities underground.

  11. Exploring Content Schemata Influence on L2 Reading: The Hunted Fox and Twelve and Not Stupid

    Directory of Open Access Journals (Sweden)

    Amizura Hanadi Mohd Radzi

    2014-10-01

    Full Text Available This paper will discuss the aspects of content schemata in second language reading among diploma level students who were taking a reading course in Universiti Teknologi MARA Perlis. In this qualitative case study, the researcher had selected two short stories that are categorized as content-familiar texts, i.e. The Hunted Fox and Twelve and Not Stupid. Six participants were asked to write a 150-word entry response on the short story and a grading criteria was used to assess the participants’ level of comprehension. An in-depth interview was also conducted on each participant. The entry responses and the interview patterns were analyzed to determine whether content schemata had contributed to the learners’ understanding of the text. This study discovered that content schemata had contributed to the learners’ understanding of the text because the learners’ comprehension was facilitated by their background knowledge on the content-familiar texts.

  12. Development and characterization of twelve microsatellite markers for Porphyra linearis Greville.

    Science.gov (United States)

    Varela-Álvarez, Elena; Paulino, Cristina; Serrão, Ester A

    2017-02-01

    The genus Porphyra (and its sister genus Pyropia) contains important red algal species that are cultivated and/or harvested for human consumption, sustaining a billion-dollar aquaculture industry. A vast amount of research has been focused on species of this genus, including studies on genetics and genomics among other areas. Twelve novel microsatellite markers were developed here for Porphyra linearis. Markers were characterized using 32 individuals collected from four natural populations of P. linearis with total heterozygosity varying from 0.098 to 0.916. The number of alleles per locus ranged from 2 to 18. All markers showed cross amplification with Porphyra umbilicalis and/or Porphyra dioica. These polymorphic microsatellite markers are useful for investigating population genetic diversity and differentiation in P. linearis and may become useful for other genetic research on the reproductive biology of this important species.

  13. Proteomic characterization of human milk whey proteins during a twelve-month lactation period.

    Science.gov (United States)

    Liao, Yalin; Alvarado, Rudy; Phinney, Brett; Lönnerdal, Bo

    2011-04-01

    Human milk is a rich source of bioactive proteins that support the early growth and development of the newborn. Although the major components of the protein fraction in human milk have been studied, the expression and relative abundance of minor components have received limited attention. We examined the expression of low-abundance proteins in the whey fraction of human milk and their dynamic changes over a twelve-month lactation period. The low-abundance proteins were enriched by ProteoMiner beads, and protein identification was performed by liquid chromatography tandem mass spectrometry. One hundred and fifteen proteins were identified, thirty-eight of which have not been previously reported in human colostrum or milk. We also for the first time described differences in protein patterns among the low-abundance proteins during lactation. These results enhance our knowledge about the complexity of the human milk proteome, which constitutes part of the advantages to the breast-fed infant.

  14. Fate of the conformal fixed point with twelve massless fermions and SU(3) gauge group

    CERN Document Server

    Fodor, Zoltan; Kuti, Julius; Mondal, Santanu; Nogradi, Daniel; Wong, Chik Him

    2016-01-01

    We report new results on the conformal properties of an important strongly coupled gauge theory, a building block of composite Higgs models beyond the Standard Model. With twelve massless fermions in the fundamental representation of the SU(3) color gauge group, an infrared fixed point of the $\\beta$-function was recently reported in the theory (Cheng:2014jba) with uncertainty in the location of the critical gauge coupling inside the narrow $[ 6.0

  15. Twelve Years of Education and Public Outreach with the Fermi Gamma-ray Space Telescope

    CERN Document Server

    Cominsky, Lynn; Simonnet, Aurore; Education, the Fermi

    2013-01-01

    During the past twelve years, NASA's Fermi Gamma-ray Space Telescope has supported a wide range of Education and Public Outreach (E/PO) activities, targeting K-14 students and the general public. The purpose of the Fermi E/PO program is to increase student and public understanding of the science of the high-energy Universe, through inspiring, engaging and educational activities linked to the mission's science objectives. The E/PO program has additional more general goals, including increasing the diversity of students in the Science, Technology, Engineering and Mathematics (STEM) pipeline, and increasing public awareness and understanding of Fermi science and technology. Fermi's multi-faceted E/PO program includes elements in each major outcome category: Higher Education; Elementary and Secondary Education; Informal Education and Public Outreach.

  16. Twelve tips for developing and delivering a massive open online course in medical education.

    Science.gov (United States)

    Pickering, James D; Henningsohn, Lars; DeRuiter, Marco C; de Jong, Peter G M; Reinders, Marlies E J

    2017-07-01

    Massive open online courses (MOOCs) are a novel mode of online learning. They are typically based on higher education courses and can attract a high number of learners, often in the thousands. They are distinct from on-campus education and deliver the learning objectives through a series of short videos, recommended readings and discussion fora, alongside automated assessments. Within medical education the role of MOOCs remains unclear, with recent proposals including continuing professional development, interprofessional education or integration into campus-based blended learning curricula. In this twelve tips article, we aim to provide a framework for readers to use when developing, delivering and evaluating a MOOC within medical education based on the literature and our own experience. Practical advice is provided on how to design the appropriate curriculum, engage with learners on the platform, select suitable assessments, and comprehensively evaluate the impact of your course.

  17. Hepatoprotective activity of twelve novel 7'-hydroxy lignan glucosides from Arctii Fructus.

    Science.gov (United States)

    Yang, Ya-Nan; Huang, Xiao-Ying; Feng, Zi-Ming; Jiang, Jian-Shuang; Zhang, Pei-Cheng

    2014-09-17

    Twelve novel 7'-hydroxy lignan glucosides (1-12), including two benzofuran-type neolignans, two 8-O-4' neolignans, two dibenzylbutyrolactone lignans, and six tetrahydrofuranoid lignans, together with six known lignan glucosides (13-18), were isolated from the fruit of Arctium lappa L. (Asteraceae), commonly known as Arctii Fructus. Their structures were elucidated using spectroscopy (1D and 2D NMR, MS, IR, ORD, and UV) and on the basis of chemical evidence. The absolute configurations of compounds 1-12 were confirmed using rotating frame nuclear overhauser effect spectroscopy (ROESY), the circular dichroic (CD) exciton chirality method, and Rh2(OCOCF3)4-induced CD spectrum analysis. All of the isolated compounds were tested for hepatoprotective effects against D-galactosamine-induced cytotoxicity in HL-7702 hepatic cells. Compounds 1, 2, 7-12, and 17 showed significantly stronger hepatoprotective activity than the positive control bicyclol at a concentration of 1 × 10(-5) M.

  18. Twelve Tips for teaching medical professionalism at all levels of medical education.

    Science.gov (United States)

    Al-Eraky, Mohamed Mostafa

    2015-01-01

    Review of studies published in medical education journals over the last decade reveals that teaching medical professionalism is essential, yet challenging. According to a recent Best Evidence in Medical Education (BEME) guide, there is no consensus on a theoretical or practical model to integrate the teaching of professionalism into medical education. The aim of this article is to outline a practical manual for teaching professionalism at all levels of medical education. Drawing from research literature and author's experience, Twelve Tips are listed and organised in four clusters with relevance to (1) the context, (2) the teachers, (3) the curriculum, and (4) the networking. With a better understanding of the guiding educational principles for teaching medical professionalism, medical educators will be able to teach one of the most challenging constructs in medical education.

  19. Comparative analysis and supragenome modeling of twelve Moraxella catarrhalis clinical isolates

    Directory of Open Access Journals (Sweden)

    Hermans Peter WM

    2011-01-01

    Full Text Available Abstract Background M. catarrhalis is a gram-negative, gamma-proteobacterium and an opportunistic human pathogen associated with otitis media (OM and exacerbations of chronic obstructive pulmonary disease (COPD. With direct and indirect costs for treating these conditions annually exceeding $33 billion in the United States alone, and nearly ubiquitous resistance to beta-lactam antibiotics among M. catarrhalis clinical isolates, a greater understanding of this pathogen's genome and its variability among isolates is needed. Results The genomic sequences of ten geographically and phenotypically diverse clinical isolates of M. catarrhalis were determined and analyzed together with two publicly available genomes. These twelve genomes were subjected to detailed comparative and predictive analyses aimed at characterizing the supragenome and understanding the metabolic and pathogenic potential of this species. A total of 2383 gene clusters were identified, of which 1755 are core with the remaining 628 clusters unevenly distributed among the twelve isolates. These findings are consistent with the distributed genome hypothesis (DGH, which posits that the species genome possesses a far greater number of genes than any single isolate. Multiple and pair-wise whole genome alignments highlight limited chromosomal re-arrangement. Conclusions M. catarrhalis gene content and chromosomal organization data, although supportive of the DGH, show modest overall genic diversity. These findings are in stark contrast with the reported heterogeneity of the species as a whole, as wells as to other bacterial pathogens mediating OM and COPD, providing important insight into M. catarrhalis pathogenesis that will aid in the development of novel therapeutic regimens.

  20. Methane and carbon dioxide emission from hydroelectric power plants in the Amazon region compared with the equivalent thermoelectric power plants; Emissoes de metano e dioxido de carbono de hidreletricas na Amazonia comparadas as de termeletricas equivalentes

    Energy Technology Data Exchange (ETDEWEB)

    Pinguelli Rosa, Luiz; Schaeffer, Roberto; Santos, Marco Aurelio dos

    1996-03-01

    This document studies the theoretical and applied aspects related to the emission of gases responsible by the greenhouse effect from the hydroelectric and thermoelectric power plants 48 refs., 3 figs., 12 tabs.

  1. The Application of Traits-Based Assessment Approaches to Estimate the Effects of Hydroelectric Turbine Passage on Fish Populations

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F [ORNL; Schweizer, Peter E [ORNL

    2012-04-01

    One of the most important environmental issues facing the hydropower industry is the adverse impact of hydroelectric projects on downstream fish passage. Fish that migrate long distances as part of their life cycle include not only important diadromous species (such as salmon, shads, and eels) but also strictly freshwater species. The hydropower reservoirs that downstream-moving fish encounter differ greatly from free-flowing rivers. Many of the environmental changes that occur in a reservoir (altered water temperature and transparency, decreased flow velocities, increased predation) can reduce survival. Upon reaching the dam, downstream-migrating fish may suffer increased mortality as they pass through the turbines, spillways and other bypasses, or turbulent tailraces. Downstream from the dam, insufficient environmental flow releases may slow downstream fish passage rates or decrease survival. There is a need to refine our understanding of the relative importance of causative factors that contribute to turbine passage mortality (e.g., strike, pressure changes, turbulence) so that turbine design efforts can focus on mitigating the most damaging components. Further, present knowledge of the effectiveness of turbine improvements is based on studies of only a few species (mainly salmon and American shad). These data may not be representative of turbine passage effects for the hundreds of other fish species that are susceptible to downstream passage at hydroelectric projects. For example, there are over 900 species of fish in the United States. In Brazil there are an estimated 3,000 freshwater fish species, of which 30% are believed to be migratory (Viana et al. 2011). Worldwide, there are some 14,000 freshwater fish species (Magurran 2009), of which significant numbers are susceptible to hydropower impacts. By comparison, in a compilation of fish entrainment and turbine survival studies from over 100 hydroelectric projects in the United States, Winchell et al. (2000

  2. Twelve-year cyclic surging episode at Donjek Glacier in Yukon, Canada

    Science.gov (United States)

    Furuya, M.; Abe, T.; Sakakibara, D.

    2015-12-01

    Surge-type glaciers exhibit several-fold to orders-of-magnitude speed-up during the short active phase, resulting in km-scale terminus advance. Although there are many surge-type glaciers near the border of Alaska and the Yukon, the generation mechanisms remain uncertain because of limited and few continuous observations. To better understand the surge dynamics and predict the next event, it is essential to examine the entire surge cycles. Here we use Landsat optical imageries to reveal the long-term evolutions, and report three surging episodes at Donjek Glacier in Yukon, Canada. Using the Landsat images, we found three surging events in 1989, 2001, and 2013. In the 2001 event, the surface speed significantly increased by up to 4.5 m/d; during the quiescent phases it was ~0.5 m/d at the terminus. While the duration of active phase is about 4~5 and 2~3 year in the 2001 and 2013 events, the period in the 1989 event is unclear because of the lack of high temporal resolution data. Remarkably, the surging area is limited to the ~20-km section from the terminus instead of the entire glacier. Moreover, we examined the terminus area changes from 1975 to 2014. Although the area has been secularly decreasing probably due to the tread of global warming, it has also revealed four significant fluctuations during the nearly forty years. Comparing the speed and the area changes, the three speed-up events correspond to the terminus area fluctuations with a few time lags. It turns out that the surge event has been quite regularly repeating every twelve years. Although the behavior is rather similar to that in Svalbard glaciers in terms of maximum speed and unclear initiation season, the recurrence interval is much shorter than other nearby surges. Considering that the surge events seem to have initiated around significantly narrower area than upstream, the strong valley constriction may control the regularity as well as the twelve-year recurrence time.

  3. Experimental investigation and modelling of the interaction between an AVR and ballast load frequency controller in a stand-alone micro-hydroelectric system

    Energy Technology Data Exchange (ETDEWEB)

    Jarman, R.; Bryce, P. [University of Technology, Sydney, Broadway, NSW 2007 (Australia)

    2007-07-15

    Extensive field experience in micro-hydroelectric systems in remote rural communities demonstrates that the use of a typical automatic voltage regulator (AVR), as supplied with a brushless self-exciting synchronous alternator, can be the cause of unsatisfactory system performance. This paper presents results from experiments undertaken on a full-scale micro-hydroelectric test rig as well as system modelling with PSCAD. The source of the instability is considered to stem from the similar time constants of the ballast load frequency controller and the AVR as two competing feedback control systems. System modelling is used to verify steady state operating points, and confirms that the under-frequency roll-off characteristic of the AVR also contributes to unsatisfactory performance. (author)

  4. Uncovering the Minor Contribution of Land-Cover Change in Upland Forests to the Net Carbon Footprint of a Boreal Hydroelectric Reservoir.

    Science.gov (United States)

    Dessureault, Pierre-Luc; Boucher, Jean-François; Tremblay, Pascal; Bouchard, Sylvie; Villeneuve, Claude

    2015-07-01

    Hydropower in boreal conditions is generally considered the energy source emitting the least greenhouse gas per kilowatt-hour during its life cycle. The purpose of this study was to assess the relative contribution of the land-use change on the modification of the carbon sinks and sources following the flooding of upland forested territories to create the Eastmain-1 hydroelectric reservoir in Quebec's boreal forest using Carbon Budget Model of the Canadian Forest Sector. Results suggest a carbon sink loss after 100 yr of 300,000 ± 100,000 Mg CO equivalents (COe). A wildfire sensitivity analysis revealed that the ecosystem would have acted as a carbon sink as long as forests to the total net carbon footprint of a hydroelectric reservoir in the boreal zone can be. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  5. South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-07-01

    The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

  6. Development and testing of turbines for small-scale low-head hydroelectric power plants; Developpement des turbines a basses chutes. Laboratoire de mini-hydraulique de Montcherand

    Energy Technology Data Exchange (ETDEWEB)

    Denis, V.

    2002-07-01

    This report presents the design, development, construction and test of a turbine suited for small (up to 1 MW) and low-head (water head from 3 to 30 meters) hydroelectric power plants. The ultimate goal is to propose low-cost, simple and low-maintenance small adaptable hydroelectric units. Turbines are of the Kaplan type, axial, and have variable-pitch blades. Numerical simulations were performed to optimize the water flow at the entrance and exit of the turbine by means of appropriate fins. Various technical innovative aspects were approached. A pilot plant was built to serve as a test installation for the successively modified turbines. Measured mechanical power efficiencies are close to 89%. The installation is suitable for detecting possible cavitation and measuring the blade command torque during operation. The report is supplemented with a schematics of the generic installation and several graphics illustrating the simulation results.

  7. Proceedings on the seminar on small hydroelectric installations: Practice report and current development; Beitraege zum Seminar Kleinwasserkraft: Praxis und aktuelle Entwicklung

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This seminar on small hydroelectric installations informs on aspects of construction and administrative aspects. But above all, questions of machinery are dealt with. The book gives an overview of turbine types, topical recent developments in the sector of small hydroelectric power stations, and modern opportunities for fast and inexpensive design of power station components. Beyond the discussion of technical issues, the seminar wants to further contacts between science, turbine manufacturers, consultants and plant operators. (orig.) [Deutsch] Das Seminar Kleinwasserkraft gibt eine Uebersicht ueber bauliche Gestaltung und behoerdliche Aspekte. Vorallem behandelt es aber maschinenbauliche Problemstellungen. Es zeigt einen Ueberblick ueber Turbinentypen, aktuelle Neuentwicklungen im Kleinwassersektor, sowie moderne Moeglichkeiten zum schnellen und preiswerten Design von Kraftwerkskomponenten. Neben dem technischen Teil dient das Seminar auch der Foerderung des Kontakts zwischen Wissenschaft, Turbinenherstellern, Consultants und Anlagenbetreibern. (orig.)

  8. Application of fuzzy logic in mapping the environmental impacts of hydroelectric power plants; Aplicacao da logica difusa no mapeamento de impactos ambientais em usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Melo, M.N.; Lambert-Torres, G.; Silva, L.E. Borges da [Universidade Federal de Itajuba (UNIFEI), MG (Brazil)], Emails: germanoltorres@gmail.com, leborges@unifei.edu.br; Rissino, S.; Silva, M.F. da [Universidade Federal de Rondonia (UFRO), Porto Velho, RO (Brazil)], e-mails: srissino@gmail.com, felipe@unir.br

    2009-07-01

    During the stages prior to installation of a large enterprise, there is an obligation to obtain an environmental license for its effectiveness. However, defining the relevance of an environmental impact generated by changes elapsed in a region, is something subjective, since some variables present qualitative definitions. Aiming to interrelate the variables that influence the environmental impacts in hydroelectric plants, was made the mapping of terms natural resources and degradation of the environment, and its defining variables, based on the theory of fuzzy logic. The construction of fuzzy propositions was based on the manipulation of a rule base, with the 'if' antecedent 'then' consequent structure. It was concluded that the use of fuzzy propositions for the study of environmental impact is an effective method to map the environmental impact caused by construction of a hydroelectric plant, because it defines the degree of influence of impact on the environment.

  9. Using Water Energy for Electrical Energy Conservation by Building of Micro hydroelectric Generators on The Water Pipelines That Depend on The Difference in Elevation

    Directory of Open Access Journals (Sweden)

    Mohammed Taih Gatte

    2011-12-01

    Full Text Available In this research we study the elevations of cities and the water resources specially at the dams reservoirs and the distance between them(dams & cities, we use the Google Earth program to determine these elevations and calculate the difference between the average level (elevation of water at the dam and the average level of cities, which we want to supply it by water, in order to save electrical power by using the energy of supplied water through pipe line from dams to the cities, the pressure of supplied water must be calculated from the difference in elevations(head. The saving of energy can be achieved by two ways. The first is the energy saving by reduce the consumed power in the pumping water from river, which is used for different purposes. The second is the hydroelectric power generated by establishing a micro hydroelectric generator on the pipe line of the water supplied.

  10. Physical controls on CH4 emissions from a newly flooded subtropical freshwater hydroelectric reservoir: Nam Theun 2

    Directory of Open Access Journals (Sweden)

    C. Deshmukh

    2014-02-01

    Full Text Available In the present study, we measured CH4 ebullition and diffusion with funnels and floating chambers in the footprint of an eddy-covariance system measuring CH4 emissions at high frequency (30 mn in the Nam Theun 2 Reservoir, a recently impounded (in 2008 subtropical hydroelectric reservoir located in Lao PDR, southeast Asia. The EC fluxes were very consistent with the sum of the two terms measured independently (diffusive fluxes + ebullition = EC fluxes, indicating that the EC system picked-up both diffusive fluxes and ebullition from the reservoir. The EC system permitted to evidence a diurnal bimodal pattern of CH4 emissions anti-correlated with atmospheric pressure. During daytime, a large atmospheric pressure drop triggers CH4 ebullition (up to 100 mmol m–2 d–1 whereas at night, a more moderate peak of CH4 emission was recorded. As a consequence, fluxes during daytime were twice higher than during nighttime. A total of 4811 measurements of CH4 ebullition with submerged funnels at a weekly/fortnightly frequency were performed. The data set covers a water depth ranging from 0.4 to 16 m, and all types of flooded ecosystems. This dataset allowed to determine that ebullition depends mostly on water level change among many other variables tested. On average, ebullition was 8.5 ± 10.5 mmol m–2 d–1 (10–90 percentile range: 0.03–21.5 mmol m–2 d–1 and ranged from 0–201.7 mmol m–2 d–1. An artificial neural network model could explain up to 45% of variability of ebullition using total static pressure (sum of hydrostatic and atmospheric pressure, variations in the water level and atmospheric pressure, and bottom temperature as inputs. This model allowed extrapolation of CH4 ebullition at the reservoir scale and performing gap-filling over four years. Our results clearly showed a very high seasonality: 50% of the yearly CH4 ebullition occurs within four months of the warm dry season. Overall, ebullition contributed 60–80% of total

  11. Cost basis for hydroelectric power plants. Price level of 01.01.1995; Kostnadsgrunnlag for vannkraftanlegg. Prisnivaa pr 01.01.1995

    Energy Technology Data Exchange (ETDEWEB)

    Stensby, H.; Slapgaard, J.

    1995-08-01

    This publication provides a basis for calculation of expected average construction costs and equipment costs for large hydroelectric power plants in Norway. The publication is not intended to be a tool for projecting with regard to optimization or choice of construction types, but should be useful at an early stage of planning. There is a supplementary publication (Publication no. 20/1995) for small plants. 80 figs., 12 tabs.

  12. Margalef revisited: A new phytoplankton mandala incorporating twelve dimensions, including nutritional physiology.

    Science.gov (United States)

    Glibert, Patricia M

    2016-05-01

    Building on the classic depiction of the progression from a diatom to a dinoflagellate bloom as a function of nutrients and turbulence, known as the "Margalef mandala", a new conceptual model or mandala is presented here. The new mandala maps twelve response or effects traits, or environmental characteristics, related to different phytoplankton functional types: (1) relative preference for chemically reduced vs chemically oxidized forms of nitrogen; (2) relative availability of inorganic nitrogen and phosphorus; (3) adaptation to high vs low light and the tendency to be autotrophic vs mixotrophic; (4) cell motility; (5) environmental turbulence; (6) pigmentation quality; (7) temperature; (8) cell size; (9) relative growth rate; (10) relative production of bioactive compounds such as toxins or reactive oxygen species (ROS); (11) r vs K strategy; and (12) fate of the production in terms of grazing. The new mandala serves to highlight the differences and trade-offs between traits and/or environmental conditions, and illustrates some traits tend to track each other, a concept that may be helpful in trait-based modeling approaches and in understanding environmental factors associated with harmful algal blooms. It is hoped that this new mandala captures some of our recent insight into phytoplankton physiology and functional traits, and has contemporary relevance in light of anthropogenic changes in nutrient form and ratio. Copyright © 2016 Elsevier B.V. All rights reserved.

  13. Margalef revisited: A new phytoplankton mandala incorporating twelve dimensions, including nutrient ratios and forms

    Science.gov (United States)

    Glibert, P. M.

    2016-02-01

    Building on the classic depiction of the progression from a diatom to a dinoflagellate bloom as a function of nutrients and turbulence, known as the "Margalef mandala", a new conceptual model or mandala is presented here. The new mandala maps twelve traits or environmental characteristics related to different phytoplankton functional types: (1) relative preference for chemically reduced vs chemically oxidized forms of nitrogen; (2) relative availability of inorganic nitrogen and phosphorus; (3) adaptation to high vs low light and the tendency to be autotrophic vs mixotrophic; (4) cell motility; (5) environmental turbulence; (6) pigmentation quality; (7) temperature; (8) cell size; (9) relative growth rate; (10) relative production of bioactive compounds such as toxins or reactive oxygen species (ROS); (11) r vs K strategy; and (12) fate of the production in terms of grazing. The new mandala serves to highlight the differences and trade-offs between traits and/or environmental conditions, and illustrates some traits tend to track each other, a concept that may be helpful in trait-based modeling approaches. It is hoped that this new mandala captures some of our recent insight into phytoplankton physiology and functional traits, and has contemporary relevance in light of anthropogenic changes in nutrient form and ratio.

  14. Evolution and potential function of fibrinogen-like domains across twelve Drosophila species

    Directory of Open Access Journals (Sweden)

    Middha Sumit

    2008-05-01

    Full Text Available Abstract Background The fibrinogen-like (FBG domain consists of approximately 200 amino acid residues, which has high sequence similarity to the C-terminal halves of fibrinogen β and γ chains. Fibrinogen-related proteins (FREPs containing one or more FBG domains are found universally in vertebrates and invertebrates. In invertebrates, FREPs are involved in immune responses and other aspects of physiology. To understand the complexity of this gene family in Drosophila, we analyzed FREPs in twelve Drosophila species. Results Using the genome data from 12 Drosophila species, we identified FBG domains in each species. The results show that the gene numbers in each species vary from 14 genes up to 43 genes. Using sequence profile analysis, we found that FBG domains have high sequence similarity and are highly conserved throughout. By comparison of structure and sequence conservation, some of the FBG domains in Drosophila melanogaster are predicted to function in recognition of carbohydrates and their derivatives on the surface of microorganisms in innate immunity. Conclusion Sequence and structural analyses show that FREP family across 12 Drosophila species contains conserved FBG domains. Expansion of the FREP families in Drosophila is mainly accounted by a major expansion of FBG domains.

  15. Twelve-Year Trends of PM10 and Visibility in the Hefei Metropolitan Area of China

    Directory of Open Access Journals (Sweden)

    Lin Huang

    2016-01-01

    Full Text Available China has been experiencing severe air pollution and previous studies have mostly focused on megacities and a few hot spot regions. Hefei, the provincial capital city of Anhui province, has a population of near 5 million in its metropolitan area, but its air quality has not been reported in literature. In this study, daily PM10 and visibility data in 2001–2012 were analyzed to investigate the air quality status as well as the twelve-year pollution trends in Hefei. The results reveal that Hefei has been suffering high PM10 pollution and low visibility during the study period. The annual average PM10 concentrations are 2~3 times of the Chinese Ambient Air Quality Standard. PM10 shows fluctuating variation in 2001–2007 and has a slightly decreasing trend after 2008. The annual average visibility range is generally lower than 7 km and shows a worsening trend from 2001 to 2006 followed by an improving trend from 2007 to 2012. Wind speed, precipitation, and relative humidity have negative effects on PM10 concentrations in Hefei, while temperature could positively or negatively affect PM10. The results provide a general understanding of the status and long-term trends of PM10 pollution and visibility in a typical second-tier city in China.

  16. Validation of Twelve Small Kepler Transiting Planets in the Habitable Zone

    CERN Document Server

    Torres, Guillermo; Fressin, Francois; Caldwell, Douglas A; Twicken, Joseph D; Ballard, Sarah; Batalha, Natalie M; Bryson, Stephen T; Ciardi, David R; Henze, Christopher E; Howell, Steve B; Isaacson, Howard T; Jenkins, Jon M; Muirhead, Philip S; Newton, Elisabeth R; Petigura, Erik A; Barclay, Thomas; Borucki, William J; Crepp, Justin R; Everett, Mark E; Horch, Elliott P; Howard, Andrew W; Kolbl, Rea; Marcy, Geoffrey W; McCauliff, Sean; Quintana, Elisa V

    2015-01-01

    We present an investigation of twelve candidate transiting planets from Kepler with orbital periods ranging from 34 to 207 days, selected from initial indications that they are small and potentially in the habitable zone (HZ) of their parent stars. The expected Doppler signals are too small to confirm them by demonstrating that their masses are in the planetary regime. Here we verify their planetary nature by validating them statistically using the BLENDER technique, which simulates large numbers of false positives and compares the resulting light curves with the Kepler photometry. This analysis was supplemented with new follow-up observations (high-resolution optical and near-infrared spectroscopy, adaptive optics imaging, and speckle interferometry), as well as an analysis of the flux centroids. For eleven of them (KOI-0571.05, 1422.04, 1422.05, 2529.02, 3255.01, 3284.01, 4005.01, 4087.01, 4622.01, 4742.01, and 4745.01) we show that the likelihood they are true planets is far greater than that of a false po...

  17. Measurement and analysis of angular velocity variations of twelve-cylinder diesel engine crankshaft

    Science.gov (United States)

    Bulatović, Ž. M.; Štavljanin, M. S.; Tomić, M. V.; Knežević, D. M.; Biočanin, S. Lj.

    2011-11-01

    This paper presents the procedures for measuring and analyzing the angular velocity variation of twelve-cylinder diesel engine crankshaft on its free end and on the power-output end. In addition, the paper deals with important aspects of the measurement of crankshaft torsional oscillations. The method is based on digital encoders placed at two distances, and one of them is a sensor not inserted directly on the shaft, i.e. a non-contact method with a toothed disc is used. The principle based on toothed disc is also used to measure the actual camshaft angular velocity of in-line compact high-pressure pump the engine is equipped with, and this paper aims to demonstrate the possibility of measuring the actual angular velocity of any rotating shaft in the engine, on which it is physically possible to mount a toothed disc. The method was created completely independently during long-range development and research tests of V46 family engines. This method is specific for its particular adaptability for use on larger engines with extensive vibrations and torsional oscillations. The main purpose of this paper is a practical contribution to all the more interesting research of the use of engine crankshaft angular velocity as a diagnostic tool for identifying the engine irregular running.

  18. Access to oral health services in children under twelve years of age in Peru, 2014

    Directory of Open Access Journals (Sweden)

    Akram Hernández-Vásquez

    2016-10-01

    Full Text Available The aim of the study was to explore the patterns of dental health services access in children under twelve years of age in Peru. Data from 25,285 children under 12 years who participated in the Demographic and Family Health Survey of 2014 were reviewed. An exploratory spatial analysis was performed to project the proportions of children with access to dental health services, according to national regions, type of health service and urban or rural place of residence. The results show that of the total sample, 26.7% had access to dental health services in the last six months, 39.6% belonged to the age group 0-4 years, 40.6% lived in the Andean region and 58.3% lived in urban areas. The regions of Huancavelica, Apurimac, Ayacucho, Lima and Pasco had the highest percentages of access nationwide. In conclusion, there is low access to dental health services in the population under 12 years of age in Peru. The spatial distribution of access to dental health services allows regions to be identified and grouped according to similar access patterns, in order to better focus public health actions.

  19. Synergy between Seeking Safety and Twelve-Step Affiliation on Substance Use Outcomes for Women

    Science.gov (United States)

    Morgan-Lopez, Antonio A.; Saavedra, Lissette M.; Hien, Denise A.; Campbell, Aimee N.; Wu, Elwin; Ruglass, Lesia

    2014-01-01

    Objective The Recovery Management paradigm provides a conceptual framework for the examination of joint impact of a focal treatment and post-treatment service utilization on substance abuse treatment outcomes. We test this framework by examining the interactive effects of a treatment for comorbid PTSD and substance use, Seeking Safety, and post-treatment Twelve-Step Affiliation (TSA) on alcohol and cocaine use. Method Data from 353 women in a six-site, randomized controlled effectiveness trial within the NIDA Clinical Trials Network were analyzed under latent class pattern mixture modeling. LCPMM was used to model variation in Seeking Safety by TSA interaction effects on alcohol and cocaine use. Results Significant reductions in alcohol use among women in Seeking Safety (compared to Health Education) were observed; women in the Seeking Safety condition who followed up with TSA had the greatest reductions over time in alcohol use. Reductions in cocaine use over time were also observed but did not differ between treatment conditions nor were there interactions with post-treatment TSA. Conclusions Findings advance understanding of the complexities for treatment and continuing recovery processes for women with PTSD and SUDs, and further support the chronic disease model of addiction. PMID:23558158

  20. Coréia aguda na gravidez Acute chorea in pregnancy: comments on twelve consecutive cases

    Directory of Open Access Journals (Sweden)

    Walter C. Pereira

    1967-12-01

    Full Text Available São apresentados doze casos de coréia aguda observados entre 150.000 gestantes (1/12.500. A maioria dos surtos ocorreu no segundo trimestre da primeira gravidez. A duração média dos sintomas foi de três meses, não tendo sido registrado caso algum de óbito materno. Todos os partos foram espontâneos e normais. Houve apenas um óbito fetal conseqüente a choque hemorrágico. São tecidas considerações a propósito dos aspectos clínico, laboratorial e prognóstico da coréia gravídica, sendo focalizado mais pormenorizadamente o problema fisiopatogênico dessa afecção.Twelve consecutive cases of acute chorea occurring among 150.000 pregnant women (1/12.500 are reported. Most of the cases occurred from the fourth do the sixth month of the first pregnancy. The average duration of the symptoms was of three months and no one case of maternal death was verified in the group. The deliveries were spontaneous and normal in all the patients. Only one case of fetal death occurred in consequence of a hemorragic shock. Comments are made on the clinical, laboratorial and prognostic features of chorea gravidarum, being particulary focused the physiopathogenic problem of this condtion.

  1. TRANSIT TIMING OBSERVATIONS FROM KEPLER. VIII. CATALOG OF TRANSIT TIMING MEASUREMENTS OF THE FIRST TWELVE QUARTERS

    Energy Technology Data Exchange (ETDEWEB)

    Mazeh, Tsevi; Nachmani, Gil; Holczer, Tomer; Sokol, Gil [School of Physics and Astronomy, Raymond and Beverly Sackler Faculty of Exact Sciences, Tel Aviv University, Tel Aviv 69978 (Israel); Fabrycky, Daniel C. [Department of Astronomy and Astrophysics, University of Chicago, 5640 Ellis Ave., Chicago, IL 60637 (United States); Ford, Eric B.; Ragozzine, Darin [Astronomy Department, University of Florida, Gainesville, FL 32111 (United States); Sanchis-Ojeda, Roberto [Department of Physics and Kavli Institute for Astrophysics and Space Research, Massachusetts Institute of Technology, Cambridge, MA 02139 (United States); Rowe, Jason F.; Lissauer, Jack J. [NASA Ames Research Center, Moffett Field, CA 94035 (United States); Zucker, Shay [Department of Geophysical, Atmospheric and Planetary Sciences, Raymond and Beverly Sackler Faculty of Exact Sciences Tel Aviv University, 69978 Tel Aviv (Israel); Agol, Eric [Department of Astronomy, Box 351580, University of Washington, Seattle, WA 98195 (United States); Carter, Joshua A. [Harvard-Smithsonian Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States); Quintana, Elisa V. [SETI Institute, 189 Bernardo Ave, Suite 100, Mountain View, CA 94043 (United States); Steffen, Jason H. [Fermilab Center for Particle Astrophysics, P.O. Box 500, MS 127, Batavia, IL 60510 (United States); Welsh, William [Astronomy Department, San Diego State University, 5500 Campanile Drive, San Diego, CA 92182 (United States)

    2013-10-01

    Following the works of Ford et al. and Steffen et al. we derived the transit timing of 1960 Kepler objects of interest (KOIs) using the pre-search data conditioning light curves of the first twelve quarters of the Kepler data. For 721 KOIs with large enough signal-to-noise ratios, we obtained also the duration and depth of each transit. The results are presented as a catalog for the community to use. We derived a few statistics of our results that could be used to indicate significant variations. Including systems found by previous works, we have found 130 KOIs that showed highly significant times of transit variations (TTVs) and 13 that had short-period TTV modulations with small amplitudes. We consider two effects that could cause apparent periodic TTV—the finite sampling of the observations and the interference with the stellar activity, stellar spots in particular. We briefly discuss some statistical aspects of our detected TTVs. We show that the TTV period is correlated with the orbital period of the planet and with the TTV amplitude.

  2. Peer teaching in medical education: twelve reasons to move from theory to practice.

    Science.gov (United States)

    Ten Cate, Olle; Durning, Steven

    2007-09-01

    To provide an estimation of how often peer teaching is applied in medical education, based on reports in the literature and to summarize reasons that support the use of this form of teaching. We surveyed the 2006 medical education literature and categorised reports of peer teaching according to educational distance between students teaching and students taught, group size, and level of formality of the teaching. Subsequently, we analysed the rationales for applying peer teaching. Most reports were published abstracts in either Medical Education's annual feature 'Really Good Stuff' or the AMEE's annual conference proceedings. We identified twelve distinct reasons to apply peer teaching, including 'alleviating faculty teaching burden', 'providing role models for junior students', 'enhancing intrinsic motivation' and 'preparing physicians for their future role as educators'. Peer teaching appears to be practiced often, but many peer teaching reports do not become full length journal articles. We conclude that specifically 'near-peer teaching' appears beneficial for student teachers and learners as well as for the organisation. The analogy of the 'journeyman', as intermediate between 'apprentice' and 'master', with both learning and teaching tasks, is a valuable but yet under-recognized source of education in the medical education continuum.

  3. Heterochromatic banding patterns on chromosomes of twelve weevil species (Insecta, Coleoptera, Curculionoidea: Apionidae, Curculionidae).

    Science.gov (United States)

    Holecová, Milada; Rozek, Maria; Lachowska, Dorota

    2002-01-01

    The C-banding patterns of twelve weevil species are presented. The obtained results confirm the existence of two groups of species: with a small or large amount of heterochromatin in the karyotype. The first group comprises seven species (Apionidae: Holotrichapion pisi; Curculionidae: Phyllobius urticae, Ph. pyri, Ph. maculicornis, Tanymecus palliatus, Larinodontes turbinatus, Cionus tuberculosus). In weevils with a small amount of heterochromatin, tiny grains on the nucleus in interphase are visible, afterwards in mitotic and meiotic prophase appearing as dark dots. The absence of C-bands does not indicate a lack of heterochromatin but heterochromatic regions are sometimes so small that the condensation is not visible during the cell cycle. The second group comprises five species (Otiorhynchus niger, O. morio, Polydrusus corruscus, Barypeithes chevrolati, Nedyus quadrimaculatus) which possess much larger heteropicnotic parts of chromosomes visible during all nuclear divisions. The species examined have paracentromeric C-bands on autosomes and the sex chromosome X, except for Otiorhynchus niger, which also has an intercalary bands on one pair of autososomes. All the species examined differ in the size of segments of constitutive heterochromatin. The y heterochromosome is dot-like and wholly euchromatic in all the studied species.

  4. In vitro antibacterial and antifungal activities of twelve sponges collected from the Anambas Islands, Indonesia

    Directory of Open Access Journals (Sweden)

    Masteria Yunovilsa Putra

    2016-09-01

    Full Text Available Objective: To evaluate antimicrobial activities in methanolic extracts of twelve sponges collected from the Anambas Islands, Indonesia. Methods: The antibacterial activity of methanolic extracts was tested against two Grampositive bacteria, viz. Bacillus subtilis (ATCC 6633 and Staphylococcus aureus (ATCC 25923, and two Gram-negative bacteria, viz. Eschericia coli (ATCC 25922 and Vibrio anguillarum (ATCC 19264 using the disk diffusion assay. The antifungal activity was similarly tested against Candida albicans (ATCC 10231 and Aspergillus niger (ATCC 16404. The minimum inhibitory concentrations of promising sponges extracts were determined by the microdilution technique. Results: All the sponge species in this study showed antimicrobial activities against at least one of the test strains. Antibacterial activities were observed in 66.7% of the sponges extracts, while 30.0% of the extracts exhibited antifungal activities. Among them, the extracts of the sponges Stylissa massa and Axinyssa sp. were the most active against four tested bacteria and the yeast Candida albicans. The sponge Theonella swinhoei and two species of Xestospongia also displayed significant activities against two fungal pathogens Candida albicans and Aspergillus niger. Conclusions: Antimicrobial activities were demonstrated in extracts from various marine sponges collected from the Anambas Islands, Indonesia. The most promising sponges among them were Stylissa massa and Axinyssa sp. This is the first report of antimicrobial activity in extracts of marine sponges from the Indonesian Anambas Islands.

  5. The SLUGGS Survey: Kinematics for over 2500 Globular Clusters in Twelve Early-type Galaxies

    CERN Document Server

    Pota, Vincenzo; Romanowsky, Aaron J; Brodie, Jean P; Spitler, Lee R; Strader, Jay; Foster, Caroline; Arnold, Jacob A; Benson, Andrew; Blom, Christina; Hargis, Jonathan R; Rhode, Katherine L; Usher, Christopher

    2012-01-01

    We present a spectro-photometric survey of 2522 extragalactic globular clusters (GCs) around twelve early-type galaxies, nine of which have not been published previously. Combining space-based and multi-colour wide field ground-based imaging, with spectra from the Keck DEIMOS instrument, we obtain an average of 160 GC radial velocities per galaxy, with a high velocity precision of 15 km/s per GC. After studying the photometric properties of the GC systems, such as their spatial and colour distributions, we focus on the kinematics of metal-poor (blue) and metal-rich (red) GC subpopulations to an average distance of ~8 effective radii from the galaxy centre. Our results show that for some systems the bimodality in GC colour is also present in GC kinematics. The kinematics of the red GC subpopulations are strongly coupled with the host galaxy stellar kinematics. The blue GC subpopulations are more dominated by random motions, especially in the outer regions, and decoupled from the red GCs. Peculiar GC kinematic ...

  6. Whole-Proteome Analysis of Twelve Species of Alphaproteobacteria Links Four Pathogens

    Directory of Open Access Journals (Sweden)

    Yunyun Zhou

    2013-11-01

    Full Text Available Thousands of whole-genome and whole-proteome sequences have been made available through advances in sequencing technology, and sequences of millions more organisms will become available in the coming years. This wealth of genetic information will provide numerous opportunities to enhance our understanding of these organisms including a greater understanding of relationships among species. Researchers have used 16S rRNA and other gene sequences to study the evolutionary origins of bacteria, but these strategies do not provide insight into the sharing of genes among bacteria via horizontal transfer. In this work we use an open source software program called pClust to cluster proteins from the complete proteomes of twelve species of Alphaproteobacteria and generate a dendrogram from the resulting orthologous protein clusters. We compare the results with dendrograms constructed using the 16S rRNA gene and multiple sequence alignment of seven housekeeping genes. Analysis of the whole proteomes of these pathogens grouped Rickettsia typhi with three other animal pathogens whereas conventional sequence analysis failed to group these pathogens together. We conclude that whole-proteome analysis can give insight into relationships among species beyond their phylogeny, perhaps reflecting the effects of horizontal gene transfer and potentially providing insight into the functions of shared genes by means of shared phenotypes.

  7. INCIDENCE AND SURVIVAL OF LIPOLYTIC ORGANISMS MONITORED FOR TWELVE MONTHS IN DOMESTIC WASTEWATER AND RECEIVING STREAM

    Directory of Open Access Journals (Sweden)

    Adebowale Odeyemi

    2013-10-01

    Full Text Available The incidence and survival of lipolytic organisms in domestic wastewater and receiving stream were monitored over 12 months. The average total bacterial count in the wastewater samples reduced in April and November by 24.2% and 41.6% respectively. There was also a reduction of 42.3% and 60.1% in the load in the receiving stream in August and July. Subsequently, at 5m downstream from the entry of the wastewater the microbial load reduced in March (19.2% and June (19.2%. However, the occurrence of coliforms was more affected in the months of May (53% to July (87.2%. At 5m and 10m downstream the coliform population reduced by 27.9% and 30.1% respectively. Of the twelve (12 bacterial isolates obtained at the exit of the wastewater into the receiving stream, only four (4 were found to possess lipolytic activity. These include the species of Enterococcus, Klebsiella, Pseudomonas and Staphylococcus. There was no significant difference in the amount of nutrients found in the domestic wastewater and receiving stream during the months. This paper also discusses the implication of disposing large amounts of wastewater effluents into the receiving water and the need to remedy and minimize the overall impact of such pollution on the environment.

  8. Interaction and cooperative effort among scientific societies. Twelve years of COSCE.

    Science.gov (United States)

    Martín, Nazario; Andradas, Carlos

    2015-12-01

    The evolution of knowledge and technology in recent decades has brought profound changes in science policy, not only in the countries but also in the supranational organizations. It has been necessary, therefore, to adapt the scientific institutions to new models in order to achieve a greater and better communication between them and the political counterparts responsible for defining the general framework of relations between science and society. The Federationon of Scientific Societies of Spain (COSCE, Confederación de Sociedades Científicas de España) was founded in October 2003 to respond to the urgent need to interact with the political institutions and foster a better orientation in the process of making decisions about the science policy. Currently COSCE consists of over 70 Spanish scientific societies and more than 40,000 scientists. During its twelve years of active life, COSCE has developed an intense work of awareness of the real situation of science in Spain by launching several initiatives (some of which have joined other organizations) or by joining initiatives proposed from other groups related to science both at the Spanish level and at the European and non-European scenarios. [Int Microbiol 18(4): 245-251 (2015)].

  9. Ecological conversion efficiency and its influencers in twelve species of fish in the Yellow Sea Ecosystem

    Science.gov (United States)

    Tang, Qisheng; Guo, Xuewu; Sun, Yao; Zhang, Bo

    2007-09-01

    The ecological conversion efficiencies in twelve species of fish in the Yellow Sea Ecosystem, i.e., anchovy ( Engraulis japonicus), rednose anchovy ( Thrissa kammalensis), chub mackerel ( Scomber japonicus), halfbeak ( Hyporhamphus sajori), gizzard shad ( Konosirus punctatus), sand lance ( Ammodytes personatus), red seabream ( Pagrus major), black porgy ( Acanthopagrus schlegeli), black rockfish ( Sebastes schlegeli), finespot goby ( Chaeturichthys stigmatias), tiger puffer ( Takifugu rubripes), and fat greenling ( Hexagrammos otakii), were estimated through experiments conducted either in situ or in a laboratory. The ecological conversion efficiencies were significantly different among these species. As indicated, the food conversion efficiencies and the energy conversion efficiencies varied from 12.9% to 42.1% and from 12.7% to 43.0%, respectively. Water temperature and ration level are the main factors influencing the ecological conversion efficiencies of marine fish. The higher conversion efficiency of a given species in a natural ecosystem is acquired only under the moderate environment conditions. A negative relationship between ecological conversion efficiency and trophic level among ten species was observed. Such a relationship indicates that the ecological efficiency in the upper trophic levels would increase after fishing down marine food web in the Yellow Sea ecosystem.

  10. Differences in antimicrobial activity of chlorine against twelve most prevalent poultry-associated Salmonella serotypes.

    Science.gov (United States)

    Paul, Narayan C; Sullivan, Tarah S; Shah, Devendra H

    2017-06-01

    Chlorine is the most widely used carcass sanitizer in poultry processing in the USA. The objective of this study was to determine the effects of varying concentrations of organic matter on the susceptibility of twelve most prevalent poultry-associated Salmonella serotypes (MPPSTs) to chlorine. To mimic the microenvironment of the water used for immersion chilling, we manipulated organic matter contamination levels in pre-chilled (pH∼6, T∼4 °C) chlorinated (50 ppm) water using varying concentrations (0, 1, 2, 3, 4, and 5%) of chicken-meat-extract (CME) produced from frozen chicken carcasses. This CME-based in vitro model was challenged with ∼1 × 10(5) CFUs of each MPPST isolate and the bacterial survival was tested at 5, 30, 60 and 90 min post-challenge. In this model, the decimal reduction time (D90-values) of each MPPST was linearly correlated with the concentration of CME. Significant inter-serotype differences in the D90-values were observed. The results show that the pH, concentration of total- and free-chlorine were also linearly correlated with the presence of CME in a concentration-dependent manner. The findings of this study indicate that the serotype and the levels of organic matter contamination significantly influence Salmonella survival and that both variables should be included in models that predict effectiveness of chlorine treatment in immersion chilling.

  11. Alcoholics Anonymous and twelve-step recovery: a model based on social and cognitive neuroscience.

    Science.gov (United States)

    Galanter, Marc

    2014-01-01

    In the course of achieving abstinence from alcohol, longstanding members of Alcoholics Anonymous (AA) typically experience a change in their addiction-related attitudes and behaviors. These changes are reflective of physiologically grounded mechanisms which can be investigated within the disciplines of social and cognitive neuroscience. This article is designed to examine recent findings associated with these disciplines that may shed light on the mechanisms underlying this change. Literature review and hypothesis development. Pertinent aspects of the neural impact of drugs of abuse are summarized. After this, research regarding specific brain sites, elucidated primarily by imaging techniques, is reviewed relative to the following: Mirroring and mentalizing are described in relation to experimentally modeled studies on empathy and mutuality, which may parallel the experiences of social interaction and influence on AA members. Integration and retrieval of memories acquired in a setting like AA are described, and are related to studies on storytelling, models of self-schema development, and value formation. A model for ascription to a Higher Power is presented. The phenomena associated with AA reflect greater complexity than the empirical studies on which this article is based, and certainly require further elucidation. Despite this substantial limitation in currently available findings, there is heuristic value in considering the relationship between the brain-based and clinical phenomena described here. There are opportunities for the study of neuroscientific correlates of Twelve-Step-based recovery, and these can potentially enhance our understanding of related clinical phenomena. © American Academy of Addiction Psychiatry.

  12. Deathly silence and apocalyptic noise: Observations on the soundscape of the Book of the Twelve

    Directory of Open Access Journals (Sweden)

    Aaron Schart

    2010-03-01

    Full Text Available This paper proposes a reading of the Book of the Twelve (used interchangeably with �Twelve� and �Book� for convenience that concentrates on the sound that is included in the description of the world of the text. Three onomatopoeic devices are singled out. First, the mourning cry h�y is considered. This interjection is used differently in several of the writings: in Amos (5:18; 6:1 the prophet cries out in compassion with the addressees. By contrast, in Nahum 3:1 and Habakkuk 2:6�19, h�y is uttered in a mood of mockery. In Zechariah 2:10 a third, joyful h�y is used. It appears that the different usages cohere nicely with the overall structure of the Book of the Twelve. Secondly, the interjection has likewise shows different usages. In Amos 6:10 and 8:3, it simulates the last breath of Israelites dying when the land is devastated. By contrast, in Habakkuk 2:20, Zephaniah 1:7 and Zechariah 2:17, the addressees are directed to be silent before YHWH. This command should be perceived as an act of reverence. Again, the sequence of the occurrences coheres with the overall structure of the Book of the Twelve. Of special relevance is that the last three instances build a frame around the Babylonian exile, which lies between Zephaniah and Haggai. The third example is the phrase ham�n�m, ham�n�m in Joel 4:14. The author employs an irregular double plural to construe this place as the loudest spot (�apocalyptic noise� within the Twelve.Setu sa go tiba le modumo wa aphokhaliptiki: Ditemogo ka medumo ya Puku ya ba LesomepediPampiri ye e �i�inya go balwa ga Puku ya ba Lesomepedi (yeo e ka nogo bit�wa �Lesomepedi� goba �Puku� go bebofat�a ditaba ka go gatelela modumo wo o lego ka gare ga tlhaloso ya lefase la go tswala dingwalo t�e. Ditsela t�e tharo t�a onomathopoiki di bewa pepeneng. La mathomo, go �et�wa sello sa mahloko sa h?y. Lelahlelwa le le �omi�wa ka go fapana mo dingwalong t�e mmalwa: go Amosi

  13. Fate of the conformal fixed point with twelve massless fermions and SU(3) gauge group

    Science.gov (United States)

    Fodor, Zoltan; Holland, Kieran; Kuti, Julius; Mondal, Santanu; Nogradi, Daniel; Wong, Chik Him

    2016-11-01

    We report new results on the conformal properties of an important strongly coupled gauge theory, a building block of composite Higgs models beyond the Standard Model. With twelve massless fermions in the fundamental representation of the SU(3) color gauge group, an infrared fixed point (IRFP) of the β -function was recently reported in the theory [A. Cheng, A. Hasenfratz, Y. Liu, G. Petropoulos, and D. Schaich, J. High Energy Phys. 05 (2014) 137] with uncertainty in the location of the critical gauge coupling inside the narrow [6.0 fixed point and scale invariance in the theory with model-building implications. Using the exact same renormalization scheme as the previous study, we show that no fixed point of the β -function exists in the reported interval. Our findings eliminate the only seemingly credible evidence for conformal fixed point and scale invariance in the Nf=12 model whose infrared properties remain unresolved. The implications of the recently completed 5-loop QCD β -function for arbitrary flavor number are discussed with respect to our work.

  14. Twelve tips for creating trigger images for problem-based learning cases.

    Science.gov (United States)

    Azer, Samy A

    2007-03-01

    A trigger is the starting point of problem-based learning (PBL) cases. It is usually in the form of 5-6 text lines that provide the key information about the main character (usually the patient), including 3-4 of patient's presenting problems. In addition to the trigger text, most programs using PBL include a visual trigger. This might be in the form of a single image, a series of images, a video clip, a cartoon, or even one of the patient's investigation results (e.g. chest X-ray, pathology report, or urine sample analysis). The main educational objectives of the trigger image are as follows: (1) to introduce the patient to the students; (2) to enhance students' observation skills; (3) to provide them with new information to add to the cues obtained from the trigger text; and (4) to stimulate students to ask questions as they develop their enquiry plan. When planned and delivered effectively, trigger images should be engaging and stimulate group discussion. Understanding the educational objectives of using trigger images and choosing appropriate images are the keys for constructing successful PBL cases. These twelve tips highlight the key steps in the successful creation of trigger images.

  15. Downstream environmental impacts of dams: case study Tucurui Hydroelectric Plant, PA; Impactos ambientais a jusante de hidreletricas: o caso da usina de Tucurui, PA

    Energy Technology Data Exchange (ETDEWEB)

    Manyari, Waleska Valenca

    2007-12-15

    The hydroelectric resources of the Amazon region are considered a competitive alternative despite the structural problems they entail. Concerning the latter, plans to build large-scale dams in the region have drawn criticism mainly on account of the loss of forest cover in areas flooded by dam reservoirs and the conflicts concerning the relocation of indigenous and riverside communities in the region. This study seeks to contribute to better understanding of the environmental issue in the Amazon by focusing attention on the downstream effects of dams, which have large-scale, hitherto neglected ecological repercussions. The impact of dams extends well beyond the area surrounding the artificial lakes they create, harming rich Amazon wetland ecosystems. The morphology of dammed rivers changes in response to new inputs of energy and matter, which may in turn destroy certain biotypes. This is a remote-sensing-based case study of the Tucurui hydroelectric scheme in the Amazon state of Para. Attention is drawn to the need to take into account effects on alluvial rivers downstream from hydroelectric power plants when it comes to making planning decisions, as part of a sustainable energy policy. (author)

  16. Analysis of environmental issues related to small scale hydroelectric development. II. Design considerations for passing fish upstream around dams. Environmental Sciences Division Publication No. 1567

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrand, S.G. (ed.)

    1980-08-01

    The possible requirement of facilities to move migrating fish upstream around dams may be a factor in determining the feasibility of retrofitting small dams for hydroelectric generation. Basic design considerations are reported that should be evaluated on a site-specific basis if upstream fish passage facilities are being considered for a small scale hydroelectric project (defined as an existing dam that can be retrofitted to generate 25 MW or less). Information on general life history and geographic distribution of fish species that may require passage is presented. Biological factors important in the design of upstream passage facilities are discussed: gas bubble disease, fish swimming speed, oxygen consumption by fish, and diel and photo behavior. Three general types of facilities (fishways, fish locks, and fish lifts) appropriate for upstream fish passage at small scale hydroelectric projects are described, and size dimensions are presented. General design criteria for these facilities (including fish swimming ability and behavior) and general location of facilities at a site are discussed. Basic cost considerations for each type of passage facility, including unit cost, operation and maintenance costs, and costs for supplying attraction water, are indicated.

  17. Technical development of electric power storage system. New technological development of pumped hydroelectric power plant by Mitsubishi Heavy Industries

    Energy Technology Data Exchange (ETDEWEB)

    1988-07-01

    This report introduces the outline of the superhigh head (700-800 m) pumping water wheel and variable pumped hydroelectric power system. Due to the superheightening of head, the influence of the head loss generated in each water flowing portion to the efficiency is more severe than that of the pumping water wheel so far used. To improve it, a computorized analysis being made with high accuracy, the simplification of model testing was planned. As regards the problem of axial vibration, it was confirmed that the axial vibration calculation, using the horizontal exciting force secured by the model testing, is effective, as its result, for the prediction of axial vibration. In order to isolate the runner from the vibration, the FEM analysis facilitated the obtainment with accuracy of the characteristic frequency of runner. For the purpose of frequency control (AFC) of the electric power system, variable low frequency electric current being flown on the rotor's side, the adoption of cyclo-inverter to control the rotative velocity enabled the superheightening of efficiency and widening of operational range, particularly in case of partially loaded operation, and the generation control of cavitation and vibration. (11 figs)

  18. A Wildlife Habitat Protection, Mitigation and Enhancement Plan for Eight Federal Hydroelectric Facilities in the Willamette River Basin: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Preston, S.K.

    1987-05-01

    The development and operation of eight federal hydroelectric projects in the Willamette River Basin impacted 30,776 acres of prime wildlife habitat. This study proposes mitigative measures for the losses to wildlife and wildlife habitat resulting from these projects, under the direction of the Columbia River Basin (CRB) Fish and Wildlife Program. The CRB Fish and Wildlife Program was adopted in 1982 by the Northwest Power Planning Council, pursuant to the Northwest Power Planning Act of 1980. The proposed mitigation plan is based on the findings of loss assessments completed in 1985, that used a modified Habitat Evaluation Procedure (HEP) to assess the extent of impact to wildlife and wildlife habitat, with 24 evaluation species. The vegetative structure of the impacted habitat was broken down into three components: big game winter range, riparian habitat and old-growth forest. The mitigation plan proposes implementation of the following, over a period of 20 years: (1) purchase of cut-over timber lands to mitigate, in the long-term, for big game winter range, and portions of the riparian habitat and old-growth forest (approx. 20,000 acres); (2) purchase approximately 4,400 acres of riparian habitat along the Willamette River Greenway; and (3) three options to mitigate for the outstanding old-growth forest losses. Monitoring would be required in the early stages of the 100-year plan. The timber lands would be actively managed for elk and timber revenue could provide O and M costs over the long-term.

  19. Underground pumped storage hydroelectricity using abandoned works (deep mines or open pits) and the impact on groundwater flow

    Science.gov (United States)

    Pujades, Estanislao; Willems, Thibault; Bodeux, Sarah; Orban, Philippe; Dassargues, Alain

    2016-09-01

    Underground pumped storage hydroelectricity (UPSH) plants using open-pit or deep mines can be used in flat regions to store the excess of electricity produced during low-demand energy periods. It is essential to consider the interaction between UPSH plants and the surrounding geological media. There has been little work on the assessment of associated groundwater flow impacts. The impacts on groundwater flow are determined numerically using a simplified numerical model which is assumed to be representative of open-pit and deep mines. The main impact consists of oscillation of the piezometric head, and its magnitude depends on the characteristics of the aquifer/geological medium, the mine and the pumping and injection intervals. If an average piezometric head is considered, it drops at early times after the start of the UPSH plant activity and then recovers progressively. The most favorable hydrogeological conditions to minimize impacts are evaluated by comparing several scenarios. The impact magnitude will be lower in geological media with low hydraulic diffusivity; however, the parameter that plays the more important role is the volume of water stored in the mine. Its variation modifies considerably the groundwater flow impacts. Finally, the problem is studied analytically and some solutions are proposed to approximate the impacts, allowing a quick screening of favorable locations for future UPSH plants.

  20. FISH DIVERSITY ALONG THE LONGITUDINAL GRADIENT IN A MAN–MADE LAKE OF WEST AFRICA, TAABO HYDROELECTRIC RESERVOIR, IVORY COAST

    Directory of Open Access Journals (Sweden)

    N. G. Aliko

    2010-04-01

    Full Text Available Fish assemblage patterns in Taabo Reservoir, a hydroelectric lake of Ivory Coast, were studied and related to the longitudinal gradient (river–dam gradient composed of riverine, transitional, and lacustrine zones. Data were collected at 5 stations and each one was sampled during 5 surveys. Fish community structure was analysed using alpha and beta diversity indices. In total, 53 fish species were obtained in the whole ecosystem. Total species richness recorded at each ecological zone was 42, 43 and 45 species respectively in the riverine, transitional and lacustrine zones. Alpha diversity did not differed significantly along the longitudinal gradient but reached the highest value (33 species in the transitional zone and the lowest (18 species occurred in both the riverine and lacustrine zones. Temporal variability of Alpha diversity according to the hydrological regime of the lake differed with the zone. Beta diversity showed that fish assemblages similarity was higher between the transitional and the riverine zones (βw = 0.43 and lower between the riverine and the lacustrine zones (βw = 0.79.

  1. Analysis of legal obstacles and incentives to the development of low-head hydroelectric power in Maine

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maine is discussed. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined. The first step any developer of small-scale hydropower must take is to acquire right, title, or interest in the real property. In Maine, that step requires acquisition in some form of both river banks, the river bed, and where necessary, the land needed for the upstream impoundment area. The developer must acquire the river banks to be considered a riparian owner. Classification as a riparian is important, for only a use of water by a riparian owner is deemed a reasonable use and hence a legal use. A non-riparian could not draw water from a stream to increase the water level of an impoundment area on another stream. Apart from the usual methods of land acquisition involving sale, lease, or perhaps gift, Maine has two somewhat unique methods a developer may use for property acquisition. These methods, authorized by statute, are use of the abandoned dams law and use of the Mill Dam Act for flowage of upstream impoundment areas.

  2. The Mitigation Potential of Buffer Strips for Reservoir Sediment Yields: The Itumbiara Hydroelectric Power Plant in Brazil

    Directory of Open Access Journals (Sweden)

    Marta P. Luz

    2016-10-01

    Full Text Available Soil erosion and deposition mechanisms play a crucial role in the sustainability of both existing reservoirs and newly planned projects. Soil erosion is one of the most important factors influencing sediment transport yields, and, in the context of existing reservoirs, the surrounding watersheds supply both runoff and sediment yield to the receiving water body. Therefore, appropriate land management strategies are needed to minimize the influence of sediment yields on reservoir volume and, hence, the capacity of power generation. In this context, soil erosion control measures such as buffer strips may provide a practical and low-cost option for large reservoirs, but need to be tested at the catchment scale. This paper represents a study case for the Itumbiara hydroelectric power plant (HPP in Brazil. Four different scenarios considering radially planted buffer strips of Vetivergrass with widths of 20 m, 40 m, 100 m and 200 m are analyzed. A semi-distributed hydrological model, SWAT, was used to perform the simulations. Results indicate a reduction of sediments transported to the reservoir of between 0.2% and 1.0% per year is possible with buffer strip provision, and that this reduction, over the life of Itumbiara HPP, may prove important for lengthening the productivity of the plant.

  3. Mortality of silver eel (Anguilla anguilla migrating downstream through a small hydroelectric plant on the Drawa River in northern Poland

    Directory of Open Access Journals (Sweden)

    Dębowski Piotr

    2016-06-01

    Full Text Available The European eel, Anguilla anguilla L., is an endangered species. Barriers to its downstream spawning migration are one of the greatest threats this species faces. There are hundreds of hydroelectric plants (HEP on rivers in Poland (> 600, and thousands throughout Europe. Eel that pass through HEP turbines as they migrate downstream suffer high mortality, but this depends mainly on local and technical conditions. Silver eel mortality was estimated and the possibility of the fish bypassing the turbines was studied between November 2013 and June 2014 at a typical HEP in northern Poland. Two telemetry methods were used with 49 eel: passive integrated transponder (PIT system and acoustic telemetry. Fifty five percent of eel migrated downstream in fall 2013, soon after their release, and 45% migrated the next spring. The eel did not use the fish passes designed for upstream migration; thus, they were forced to go through the turbines, which resulted in 55% mortality. HEPs cause interruptions and delays in eel spawning migrations and are responsible for high eel mortality. This can make implementing an eel restitution plan difficult or even impossible in river systems with many barriers.

  4. Modeling and Estimating of Load Demand of Electricity Generated from Hydroelectric Power Plants in Turkey using Machine Learning Methods

    Directory of Open Access Journals (Sweden)

    DURSUN, B.

    2014-02-01

    Full Text Available In this study, the electricity load demand, between 2012 and 2021, has been estimated using the load demand of the electricity generated from hydroelectric power plants in Turkey between 1970 and 2011. Among machine learning algorithms, Multilayer Perceptron, Locally Weighted Learning, Additive Regression, M5Rules and ZeroR classifiers are used to estimate the electricity load demand. Among them, M5Rules and Multilayer Perceptron classifiers are observed to have better performance than the others. ZeroR classifier is a kind of majority classifier used to compare the performances of other classifiers. Locally Weighted Learning and Additive Regression classifiers are Meta classifiers. In the training period conducted by Locally Weighted Learning and Additive Regression classifiers, when Multilayer Perceptron and M5Rules classifiers are chosen respectively, it is possible to obtain models with the highest performance. As a result of the experiments performed using M5Rules and Multilayer Perceptron classifiers, correlation coefficient values of 0.948 and 0.9933 are obtained respectively. And, Mean Absolute Error and Root Mean Squared Error value of Multilayer Perceptron classifier are closer to zero than that of M5Rules classifier. Therefore, it can be said the model performed by Multilayer Perceptron classifier has the best performance compared to the models of other classifiers.

  5. Assessment of Heavy Metals in Water, Sediment, and Fishes of a Large Tropical Hydroelectric Dam in Sarawak, Malaysia

    Directory of Open Access Journals (Sweden)

    Siong Fong Sim

    2016-01-01

    Full Text Available Bakun Hydroelectric Dam in Sarawak is one of the world highest concrete rock filled dams. This paper reports the heavy metals concentrations in water, sediment, and fishes of Bakun Dam. Water and sediment samples were collected from 11 stations and 6 fish species were caught. The samples were digested with open acid digestion and the metals contents were analysed using an atomic absorption spectrophotometer and mercury analyser. The method was validated based on certified reference materials. A higher concentration of Fe and Mn was detected in downstream water with significant longitudinal variation. Cu, Zn, and Hg were present in trace amount. All elements analysed were consistently found in sediment with no risk of contamination. For fish, Hemibagrus planiceps was characterised by higher affinity for Hg accumulation. The concentrations detected in all fish species were within the permissible guideline of 0.5 mg/kg. The health risk assessment suggested that Barbonymus schwanenfeldii, Puntioplites waandersii, Cyclocheilichthys apogon, and Hemibagrus planiceps were characterised by hazard index > 1 implying possible adverse effects. The amount of fish recommended for adults and children was in the range of 500–775 g/week and 33–135 g/week, respectively.

  6. Geração hidrelétrica, termelétrica e nuclear Hydroelectric, thermal and nuclear generation

    Directory of Open Access Journals (Sweden)

    Luiz Pinguelli Rosa

    2007-04-01

    Full Text Available O artigo apresenta a situação da produção de energia elétrica no Brasil e expõe os problemas para a implementação de um novo modelo no setor energético e para a inclusão de termelétricas em um grande sistema hidrelétrico. Questões ambientais são consideradas, particularmente as emissões de gás de efeito estufa. Atenta ainda para a possível construção de novos reatores nucleares no Brasil e destaca a importância da conservação energética e do uso de fontes de energia renovável.The situation of electric energy generation in Brazil is presented here, showing the problems in the implementation of the new model for the Power Sector, as well as in the inclusion of thermal plants in a very big hydroelectric system. Environment issues are considered, in particular the greenhouse gas emissions. The article pays attention to the possible construction of new nuclear reactors in Brazil. It is pointed out the importance of energy conservation and of using renewable energy sources.

  7. Developing a thermodynamic a conceptual model for the Itumbiara hydroelectric reservoir based on satellite and telemetric data

    Directory of Open Access Journals (Sweden)

    Enner Herenio de Alcântara

    2011-08-01

    Full Text Available Aquatic systems continually respond to climatic conditions that vary over broad scales of space and time. The response of each water body to external conditions (hydro-meteorological processes is revealed in the first place by the thermal structures present in water body. Most lacustrine chemical, physical and biological processes are affected directly by lake hydrological (e.g. lake depth and thermal changes (e.g. seasonal stratification, and are thus, indirectly affected by climate variation. Understanding lake-climate system interactions is therefore of fundamental importance to evaluate the effects of climate change on limnological processes. Based on this, the objective of this work was to develop a thermodynamic conceptual model for the Itumbiara hydroelectric reservoir (Goiás State, Brazil. The developed methodology was based on the use of satellite imagery of moderate resolution that allow the computation of the water surface temperature from 2003 to 2008 (six years during the daytime and nighttime. The results showed the potential of the use of moderate resolution satellite data to study water surface temperature variability and to explain the main causes of this variability. The use of hydro-meteorological and bulk temperature collected by station and autonomous buoy, respectively, contributed to better understand the physical processes in the mixed depth of the reservoir. Also the results allow the elaboration of conceptual models for the thermodynamics of the Itumbiara reservoir.

  8. Assessment of power step performances of variable speed pump-turbine unit by means of hydro-electrical system simulation

    Science.gov (United States)

    Béguin, A.; Nicolet, C.; Hell, J.; Moreira, C.

    2017-04-01

    The paper explores the improvement in ancillary services that variable speed technologies can provide for the case of an existing pumped storage power plant of 2x210 MVA which conversion from fixed speed to variable speed is investigated with a focus on the power step performances of the units. First two motor-generator variable speed technologies are introduced, namely the Doubly Fed Induction Machine (DFIM) and the Full Scale Frequency Converter (FSFC). Then a detailed numerical simulation model of the investigated power plant used to simulate power steps response and comprising the waterways, the pump-turbine unit, the motor-generator, the grid connection and the control systems is presented. Hydroelectric system time domain simulations are performed in order to determine the shortest response time achievable, taking into account the constraints from the maximum penstock pressure and from the rotational speed limits. It is shown that the maximum instantaneous power step response up and down depends on the hydro-mechanical characteristics of the pump-turbine unit and of the motor-generator speed limits. As a results, for the investigated test case, the FSFC solution offer the best power step response performances.

  9. Behind an ambitious megaproject in Asia: The history and implications of the Bakun hydroelectric dam in Borneo

    Energy Technology Data Exchange (ETDEWEB)

    Sovacool, Benjamin K., E-mail: bsovacool@nus.edu.sg [Lee Kuan Yew School of Public Policy, National University of Singapore, Oei Tiong Ham Building, 469C Bukit Timah Road, Singapore 259772 (Singapore); Bulan, L.C. [Lee Kuan Yew School of Public Policy, National University of Singapore, Oei Tiong Ham Building, 469C Bukit Timah Road, Singapore 259772 (Singapore)

    2011-09-15

    Using a case-study, inductive, narrative approach, this article explores the history, drivers, benefits, and barriers to the Bakun Hydroelectric Project in East Malaysia. Situated on the island of Borneo, Bakun Dam is a 204 m high concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. Bakun Dam and its affiliated infrastructure could be the single largest and most expensive energy project ever undertaken in Southeast Asia. Based on data collected through site visits, original field research in Sarawak, and more than 80 research interviews, the article begins by teasing out the complex history and drivers behind the Bakun project before identifying a set of potential social, political, and economic benefits the project could deliver. It then delves into six sets of barriers in the technical, economic, political, legal and regulatory, social, and environmental realms. We find that Bakun illustrates how centralized energy megaprojects, while ostensibly championed for reasons of economies of scale and the ability to bring about transformational change in the shortest period of time, often fail to address broader development goals such as fighting energy poverty and improving the livelihoods of the local communities they are supposed to serve. - Highlights: > Bakun Dam is concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. > The project faces technical, economic, political, legal and regulatory, social, and environmental barriers. > We conclude the project will fail to fight energy poverty or improve the livelihoods of local populations.

  10. Safety Assessment of High-Risk Operations in Hydroelectric-Project Based on Accidents Analysis, SEM, and ANP

    Directory of Open Access Journals (Sweden)

    Jian-Lan Zhou

    2013-01-01

    Full Text Available Safety risk analysis and assessment of high-risk work system in hydroelectric project has an important role in safety management. The interactive relationships between human factors and the importance of factors are analyzed and proposed. We analyze the correlation relationship among the factors by using statistical method, which is more objective than subjective judgment. The HFACS is provided to establish a rational and an applicable index system for investigating human error in accidents; the structural equation modeling (SEM and accident data are used to construct system model and acquire the path coefficient among the risk factor variables; the ANP model is built to assess the importance of accident factors. 289 pieces of valid questionnaires data are analyzed to obtain the path coefficient between risk factor variables and to build the ANP model’s judgment matrix. Finally, the human factors’ weights are calculated by ANP model. Combining SEM’s results and factor's frequency analysis and building the ANP model, the results show that the four greatest weight values of the factors are, respectively, “personal readiness,” “perception and decision errors,” “skill-based errors,” and “violation operations.” The results of ANP model provide a reference for the engineering and construction management.

  11. Sediment management of run-of-river hydroelectric power project in the Himalayan region using hydraulic model studies

    Indian Academy of Sciences (India)

    NEENA ISAAC; T I ELDHO

    2017-07-01

    Storage capacity of hydropower reservoirs is lost due to sediment deposition. The problem is severe in projects located on rivers with high sediment concentration during the flood season. Removing the sediment deposition hydraulically by drawdown flushing is one of the most effective methods for restoring the storagecapacity. Effectiveness of the flushing depends on various factors, as most of them are site specific. Physical/mathematical models can be effectively used to simulate the flushing operation, and based on the results of the simulation, the layout design and operation schedule of such projects can be modified for better sediment management. This paper presents the drawdown flushing studies of the reservoir of a Himalayan River Hydroelectric Project called Kotlibhel in Uttarakhand, India. For the hydraulic model studies, a 1:100 scale geometrically similar model was constructed. Simulation studies in the model indicated that drawdown flushing for duration of 12 h with a discharge of 500 m3/s or more is effective in removing the annual sediment deposition in the reservoir. The model studies show that the sedimentation problem of the reservoir can be effectively managed through hydraulic flushing.

  12. Carbon stored in forest plantations of Pinus caribaea, Cupressus lusitanica and Eucalyptus deglupta in Cachí Hydroelectric Project

    Directory of Open Access Journals (Sweden)

    Marylin Rojas

    2014-06-01

    Full Text Available Forest plantations are considered the main carbon sinks thought to reduce the impact of climate change. Regarding many species, however, there is a lack of information in order to establish metrics on accumulation of biomass and carbon, principally due to the level of difficulty and the cost of quantification through direct measurement and destructive sampling. In this research, it was evaluated carbon stocks of forest plantations near the dam of hydroelectric project Cachí, which belongs to Instituto Costarricense de Electricidad. 25 unit samples were evaluated along some plantations that contain three different species. 30 Pinus caribacea trees, 14 Cupressus lusitanica and 15 Eucalyptus deglupta were extracted. The biomass was quantified by means of the destructive method. First of all, every component of the tree was weighed separately; then, sampling was obtained in order to determine the dry matter and the carbon fraction. 110 biomass samples from the three species were analyzed in laboratory, including all the components (leaves, branches, shaft, and root. The carbon fraction varied between 47,5 and 48,0 for Pinus caribacea; between 32,6 and 52,7 for Cupressus lusitanica, and beween 36,4 and 50,3% for Eucalyptus deglupta. The stored carbon was 230, 123, and 69 Mg ha-1 in plantations of P. caribaea, C. lusitanica and E. deglupta, respectively. Approximately, 75% of the stored carbon was detected in the shaft.

  13. Revolutionising landscapes: Hydroelectricity and the heavy industrialisation of society and environment in the Comte de Beauharnois, 1927--1948

    Science.gov (United States)

    Pelletier, Louis-Raphael

    This dissertation analyses the rapid industrialisation of the rural Comte de Beauharnois and the adjacent stretch of the Fleuve Saint-Laurent owing to the construction, between 1929 and 1948, of a gigantic canal for hydroelectricity production and navigation by an electricity corporation called the Beauharnois Light Heat and Power (BLH&P). Using principally the archives of the BLH&P---especially its complaints files and its rich photographic record---this thesis argues that this process exemplifies the finance capitalist reorganisation of the society and ecosystems of the Canadian province of Quebec from the 19th century to the Great Depression. In keeping with recent work in environmental history, the transformation of rural landscapes and a river for heavy industry is described as an important dimension of a revolution in modes of production. More specifically, I argue that, in the case under study, the finance-capitalist reorganisation of Quebec revolved around two central and explicit projects, one social and the other environmental: the grouping of most individuals in an industrial working class without control over the means of production and the reorganisation of rural landscapes into reservoirs of modern energy and industrial natural resources.

  14. Improving Comparability Of Survey Results Through Ex-Post Harmonisation A Case Study With Twelve European National Travel Surveys

    DEFF Research Database (Denmark)

    Christensen, Linda; Hubert, Jean-Paul; Järvi, Tuuli

    that reflect behavioural differences rather than methodological ones, in the context of the COST Action SHANTI (Survey Harmonisation with New Technologies Improvement, TUD0804) an ex-post harmonisation approach was developed using microdata from twelve European NTS’s. The paper presents both concept and basic...

  15. Twelve Years of Education and Public Outreach with the Fermi Gamma-ray Space Telescope

    Science.gov (United States)

    Cominsky, Lynn R.; McLin, K. M.; Simonnet, A.; Fermi E/PO Team

    2013-04-01

    During the past twelve years, NASA's Fermi Gamma-ray Space Telescope has supported a wide range of Education and Public Outreach (E/PO) activities, targeting K-14 students and the general public. The purpose of the Fermi E/PO program is to increase student and public understanding of the science of the high-energy Universe, through inspiring, engaging and educational activities linked to the mission’s science objectives. The E/PO program has additional more general goals, including increasing the diversity of students in the Science, Technology, Engineering and Mathematics (STEM) pipeline, and increasing public awareness and understanding of Fermi science and technology. Fermi's multi-faceted E/PO program includes elements in each major outcome category: ● Higher Education: Fermi E/PO promotes STEM careers through the use of NASA data including research experiences for students and teachers (Global Telescope Network), education through STEM curriculum development projects (Cosmology curriculum) and through enrichment activities (Large Area Telescope simulator). ● Elementary and Secondary education: Fermi E/PO links the science objectives of the Fermi mission to well-tested, customer-focused and NASA-approved standards-aligned classroom materials (Black Hole Resources, Active Galaxy Education Unit and Pop-up book, TOPS guides, Supernova Education Unit). These materials have been distributed through (Educator Ambassador and on-line) teacher training workshops and through programs involving under-represented students (after-school clubs and Astro 4 Girls). ● Informal education and public outreach: Fermi E/PO engages the public in sharing the experience of exploration and discovery through high-leverage multi-media experiences (Black Holes planetarium and PBS NOVA shows), through popular websites (Gamma-ray Burst Skymap, Epo's Chronicles), social media (Facebook, MySpace), interactive web-based activities (Space Mysteries, Einstein@Home) and activities by

  16. Relative peripheral refraction in children: twelve-month changes in eyes with different ametropias.

    Science.gov (United States)

    Lee, Tsui-Tsui; Cho, Pauline

    2013-05-01

    To determine the peripheral refraction of children with different types of ametropias and to evaluate the relationship between central refractive changes, baseline relative peripheral refraction (RPR) and changes in RPR over a 12-month monitoring period. Cycloplegic central and peripheral refraction were performed biannually on the right eyes of children aged 6-9 for 12 months, using an open-view autorefractor. Peripheral refraction were measured along 10°, 20° and 30° from central fixation in both nasal and temporal fields. Refractive data were transposed into M, J0 and J45 vectors for analyses. RPR was determined by subtracting the central measurement from each peripheral measurement. Hyperopic eyes showed relative peripheral myopia while myopic eyes had relative hyperopia across the central 60° horizontal field at baseline. Emmetropic eyes had relative myopia within but showed relative hyperopia beyond the central 30° field. However, there was no significant correlation between central refractive changes and baseline RPR or between changes in central refraction and RPR over twelve months in any refractive groups. Correlations between changes in PR and central myopic shift were found mainly in the nasal field in different groups. In the subgroup analysis on the initially emmetropic and the initially myopic groups, the subgroups with faster myopic progression did not have significantly different RPR from the subgroups with slower progression. The RPR pattern of the initially emmetropic and the initially myopic groups became more asymmetric at the end of the study period with a larger increase in relative hyperopia in the temporal field. RPR patterns were different among hyperopic, emmetropic and myopic eyes. However, baseline RPR and changes in RPR cannot predict changes in central refraction over time. Our results did not provide evidence to support the hypothesis of RPR as a causative factor for myopic central refractive changes in children. Ophthalmic

  17. Computational study of the structural and vibrational properties of ten and twelve vertex closo-carboranes

    Energy Technology Data Exchange (ETDEWEB)

    Salam, A.; Deleuze, M.S.; Francois, J.-P

    2003-01-01

    Calculations using ab initio Hartree-Fock and Density Functional theories, the latter employing the B3LYP functional, in combination with a number of large standard basis sets ranging from 6-31G** to cc-pVDZ, have been performed on a series of ten and twelve vertex closo-carborane isomer species. Results obtained for optimized structural parameters and molecular properties are presented for 1,2-, 1,6- and 1,10-C{sub 2}B{sub 8}H{sub 10} and 1,2-, 1,7- and 1,12-C{sub 2}B{sub 10}H{sub 12} and compared, where possible, with both earlier theoretical data and experiment. Irrespective of the model chemistry chosen, the para-isomer in each class of carborane cluster is found to be the most stable species, corresponding to a structure in which the cage carbon atoms are positioned at diametrically opposed ends of the respective polyhedron. Boron-hydrogen and carbon-hydrogen bond lengths are found to change little on going from isomers of one particular cage size to another, supporting analogous conclusions previously established for small closo-carborane cages possessing five, six and seven vertices. The calculated vibrational spectra of the isomers of both decacarborane and dodecacarborane are seen to be similar to each other and reflect a high degree of rigidity within each cluster. Key polyhedral skeletal breathing modes along with characteristic boron-hydrogen and carbon-hydrogen stretching frequencies are identified in the spectra and compared with experiment. Thermochemical data relating to each species are also analyzed.

  18. Indifference to pain syndrome in a twelve-year-old boy (case report

    Directory of Open Access Journals (Sweden)

    Baghdadi T

    2007-08-01

    Full Text Available Background: People vary greatly in their response to painful stimuli, from those with a low pain threshold to those with indifference to pain. However, insensitivity to pain is a rare disorder, characterized by the lack of usual subjective and objective responses to noxious stimuli. Patients who have congenital indifference to pain sustain painless injuries beginning in infancy, but have sensory responses that are otherwise normal on examination. Perception of passive movement, joint position, and vibration is normal in these patients, as are tactile thresholds and light touch perception. Case report: A twelve-year-old boy was admitted to the hospital for a painless deformity, degeneration in both knees and a neglected femoral neck fracture that was inappropriately painless. Further examination revealed normal sensory responses, perception of passive movement, joint position, vibration tactile thresholds and light touch perception. Spinal cord and brain MRI were normal as was the electromyography and nerve conduction velocity (EMG/NCV examination. There was no positive family history for this disorder. Conclusion: The deficits present in the different pain insensitivity syndromes provide insight into the complex anatomical and physiological nature of pain perception. Reports on pain asymbolia, in which pain is perceived but does not cause suffering, and related cortical conditions illustrate that there can be losses that independently involve either the sensory-discriminative component or the affective-motivational component of pain perception, thus highlighting their different anatomical localization. The paucity of experience with this entity and the resultant diagnostic problems, the severity of the associated disabling arthropathy and underscore the importance of this case report of indifference to pain.

  19. Removal of trace level amounts of twelve sulfonamides from drinking water by UV-activated peroxymonosulfate.

    Science.gov (United States)

    Cui, Changzheng; Jin, Lei; Jiang, Lei; Han, Qi; Lin, Kuangfei; Lu, Shuguang; Zhang, Dong; Cao, Guomin

    2016-12-01

    Trace levels of residual antibiotics in drinking water may threaten public health and become a serious problem in modern society. In this work, we investigated the degradation of twelve sulfonamides (SAs) at environmentally relevant trace level concentrations by three different methods: ultraviolet (UV) photolysis, peroxymonosulfate (PMS) oxidation, and UV-activated PMS (UV/PMS). Sulfaguanidine, sulfadiazine, sulfamerazine, sulfamethazine, sulfathiazole, sulfamethoxydiazine, and sulfadimethoxine were be effectively removed by direct UV photolysis and PMS oxidation. However, sulfanilamide, sulfamethizole, sulfamethoxazole, sulfisoxazole, and sulfachloropyridazine were not completely degraded, despite prolonging the UV irradiation time to 30min or increasing the PMS concentration to 5.0mg·L(-1). UV/PMS provided more thorough elimination of SAs, as demonstrated by the complete removal of 200ng·L(-1) of all SAs within 5min at an initial PMS concentration of 1.0mg·L(-1). UV/PMS promoted SA decomposition more efficiently than UV photolysis or PMS oxidation alone. Bicarbonate concentration and pH had a negligible effect on SA degradation by UV/PMS. However, humic acid retarded the process. Removal of 200ng·L(-1) of each SA from a sample of sand-filtered effluent from a drinking water treatment plant (DWTPs) was quickly and completely achieved by UV/PMS. Meanwhile, about 41% of the total organic carbon (TOC) was eliminated. Scavenging experiments showed that sulfate radical (SO4(-)) was the predominant species involved in the degradation. It is concluded that UV/PMS is a rapid and efficient method for removing trace-level SAs from drinking water. Copyright © 2016 Elsevier B.V. All rights reserved.

  20. A survey of innovation through duplication in the reduced genomes of twelve parasites.

    Directory of Open Access Journals (Sweden)

    Jeremy D DeBarry

    Full Text Available We characterize the prevalence, distribution, divergence, and putative functions of detectable two-copy paralogs and segmental duplications in the Apicomplexa, a phylum of parasitic protists. Apicomplexans are mostly obligate intracellular parasites responsible for human and animal diseases (e.g. malaria and toxoplasmosis. Gene loss is a major force in the phylum. Genomes are small and protein-encoding gene repertoires are reduced. Despite this genomic streamlining, duplications and gene family amplifications are present. The potential for innovation introduced by duplications is of particular interest. We compared genomes of twelve apicomplexans across four lineages and used orthology and genome cartography to map distributions of duplications against genome architectures. Segmental duplications appear limited to five species. Where present, they correspond to regions enriched for multi-copy and species-specific genes, pointing toward roles in adaptation and innovation. We found a phylum-wide association of duplications with dynamic chromosome regions and syntenic breakpoints. Trends in the distribution of duplicated genes indicate that recent, species-specific duplicates are often tandem while most others have been dispersed by genome rearrangements. These trends show a relationship between genome architecture and gene duplication. Functional analysis reveals: proteases, which are vital to a parasitic lifecycle, to be prominent in putative recent duplications; a pair of paralogous genes in Toxoplasma gondii previously shown to produce the rate-limiting step in dopamine synthesis in mammalian cells, a possible link to the modification of host behavior; and phylum-wide differences in expression and subcellular localization, indicative of modes of divergence. We have uncovered trends in multiple modes of duplicate divergence including sequence, intron content, expression, subcellular localization, and functions of putative recent duplicates that

  1. Characterizing gene-gene interactions in a statistical epistasis network of twelve candidate genes for obesity.

    Science.gov (United States)

    De, Rishika; Hu, Ting; Moore, Jason H; Gilbert-Diamond, Diane

    2015-01-01

    Recent findings have reemphasized the importance of epistasis, or gene-gene interactions, as a contributing factor to the unexplained heritability of obesity. Network-based methods such as statistical epistasis networks (SEN), present an intuitive framework to address the computational challenge of studying pairwise interactions between thousands of genetic variants. In this study, we aimed to analyze pairwise interactions that are associated with Body Mass Index (BMI) between SNPs from twelve genes robustly associated with obesity (BDNF, ETV5, FAIM2, FTO, GNPDA2, KCTD15, MC4R, MTCH2, NEGR1, SEC16B, SH2B1, and TMEM18). We used information gain measures to identify all SNP-SNP interactions among and between these genes that were related to obesity (BMI > 30 kg/m(2)) within the Framingham Heart Study Cohort; interactions exceeding a certain threshold were used to build an SEN. We also quantified whether interactions tend to occur more between SNPs from the same gene (dyadicity) or between SNPs from different genes (heterophilicity). We identified a highly connected SEN of 709 SNPs and 1241 SNP-SNP interactions. Combining the SEN framework with dyadicity and heterophilicity analyses, we found 1 dyadic gene (TMEM18, P-value = 0.047) and 3 heterophilic genes (KCTD15, P-value = 0.045; SH2B1, P-value = 0.003; and TMEM18, P-value = 0.001). We also identified a lncRNA SNP (rs4358154) as a key node within the SEN using multiple network measures. This study presents an analytical framework to characterize the global landscape of genetic interactions from genome-wide arrays and also to discover nodes of potential biological significance within the identified network.

  2. Thermal environment in eight low-energy and twelve conventional Finnish houses.

    Science.gov (United States)

    Kähkönen, Erkki; Salmi, Kari; Holopainen, Rauno; Pasanen, Pertti; Reijula, Kari

    2015-11-01

    We assessed the thermal environment of eight recently built low-energy houses and twelve conventional Finnish houses. We monitored living room, bedroom and outdoor air temperatures and room air relative humidity from June 2012 to September 2013. Perceived thermal environment was evaluated using a questionnaire survey during the heating, cooling and interim seasons. We compared the measured and perceived thermal environments of the low-energy and conventional houses. The mean air temperature was 22.8 °C (21.9-23.8 °C) in the low-energy houses, and 23.3 °C (21.4-26.5 °C) in the conventional houses during the summer (1. June 2013-31. August 2013). In the winter (1. December 2012-28. February 2013), the mean air temperature was 21.3 °C (19.8-22.5 °C) in the low-energy houses, and 21.6 °C (18.1-26.4 °C) in the conventional houses. The variation of the air temperature was less in the low-energy houses than that in the conventional houses. In addition, the occupants were on average slightly more satisfied with the indoor environment in the low-energy houses. However, there was no statistically significant difference between the mean air temperature and relative humidity of the low-energy and conventional houses. Our measurements and surveys showed that a good thermal environment can be achieved in both types of houses.

  3. Phytochemical screening of twelve species of phytoplankton isolated from Arabian Sea coast

    Directory of Open Access Journals (Sweden)

    Sushanth Vishwanath Rai

    2015-11-01

    Full Text Available Objective: To analyze the phytochemicals in twelve species of marine phytoplankton. Methods: Total phenolic content of methanol extract was estimated by the Folin-Ciocalteu method. Total flavonoid content of the methanol extarct was determined by aluminium chloride method. Chlorophylls, β-carotene and astaxanthin were estimated by acetone extraction method. Vitamin C was determined by dinitrophenyl-hydrazine method. Phycobiliproteins such as allophycocyanin, phycocyanin and phycoerythrin in the aqueous extracts were determined. Results: Total phenolics varied from 5.41 mg gallic acid equivalents/g dry weight (DW in Phormidium corium (P. corium to 17.37 mg gallic acid equivalents/g DW in Oscillatoria fremyii (O. fremyii. Total flavonoids ranged between 0.74 mg quercetin equivalent/g DW in P. corium and 9.87 mg quercetin equivalent/g DW in Nannochloropsis oceanica. Chlorophyll-a pigment was high in Chaetoceros calcitrans (C. calcitrans (15.51 mg/g DW and low in P. corium (1.08 mg/g DW. Chlorophyll-c ranged between 0.07 mg/g DW in Nannochloropsis oceanica and 4.62 mg/g DW in C. calcitrans. High contents of β-carotene and astaxanthin were found in C. calcitrans and low in P. corium which ranged from 0.33 to 10.03 mg/g DW and 0.18 to 3.85 mg/g DW, respectively. Vitamin C content varied from 0.50 mg/g DW in C. calcitrans to 1.51 mg/g DW in Phormidium tenue. O. fremyii showed highest total phycobiliproteins of 317.05 mg/g DW. High contents of allophycocyanin and phycocyanin were found in O. fremyii, whereas high contents of phycoerythrin were found in Oscillatoria sancta. All the three phycobiliproteins were low in Chroococcus turgidus. Conclusions: Marine phytoplankton are one of the natural sources providing novel biologically active compounds with potential for pharmaceutical applications.

  4. Phytochemical screening of twelve species of phytoplankton isolated from Arabian Sea coast

    Institute of Scientific and Technical Information of China (English)

    Sushanth Vishwanath Rai; Madaiah Rajashekhar

    2015-01-01

    Objective:To analyze the phytochemicals in twelve species of marine phytoplankton. Methods: Total phenolic content of methanol extract was estimated by the Folin-Ciocalteu method. Total flavonoid content of the methanol extarct was determined by aluminium chloride method. Chlorophylls,β-carotene and astaxanthin were estimated by acetone extraction method. Vitamin C was determined by dinitrophenyl-hydrazine method. Phycobiliproteins such as allophycocyanin, phycocyanin and phycoerythrin in the aqueous extracts were determined. Results: Total phenolics varied from 5.41 mg gallic acid equivalents/g dry weight (DW) in Phormidium corium (P. corium) to 17.37 mg gallic acid equivalents/g DW inOscillatoria fremyii(O. fremyii). Total flavonoids ranged between 0.74 mg quercetin equivalent/g DW inP. corium and 9.87 mg quercetin equivalent/g DW inNannochloropsis oceanica. Chlorophyll-a pigment was high inChaetoceros calcitrans(C. calcitrans)(15.51 mg/g DW) and low inP. corium (1.08 mg/g DW). Chlorophyll-c ranged between 0.07 mg/g DW inNannochloropsis oceanica and 4.62 mg/g DW inC. calcitrans. High contents ofβ-carotene and astaxanthin were found inC. calcitrans and low inP. corium which ranged from 0.33 to 10.03 mg/g DW and 0.18 to 3.85 mg/g DW, respectively. Vitamin C content varied from 0.50 mg/g DW inC. calcitrans to 1.51 mg/g DW inPhormidium tenue.O. fremyii showed highest total phycobiliproteins of 317.05 mg/g DW. High contents of allophycocyanin and phycocyanin were found inO. fremyii, whereas high contents of phycoerythrin were found inOscillatoria sancta. All the three phycobiliproteins were low inChroococcus turgidus. Conclusions: Marine phytoplankton are one of the natural sources providing novel biologically active compounds with potential for pharmaceutical applications.

  5. Nutrient Contents per Serving of Twelve Varieties of Cooked Rice Marketed in Jordan

    Directory of Open Access Journals (Sweden)

    Jafar M. El-Qudah

    2008-01-01

    Full Text Available Jordan imports rice from different countries without any quality preferences. Twelve varieties of cooked rice marketed in Jordan were analyzed. The content per serving of these varieties were computed for energy, protein, carbohydrates, fat, calcium, sodium, potassium, magnesium, manganese, copper, iron and phosphorous. The protein content per serving found to range from 0.49 g for La Cigala rice to 6.2 g for Harvest rice. The fat content for all rice brands was less than 0.37 g per serving. The energy content ranged from 172.12 g/serving for Basmati rice to 212.25 g/serving for Sun White rice. Generally, all rice varieties contain significant amounts of minerals per serving. Ruzzana found to contain the highest level of calcium (38.2 mg/serving and Amber the lowest calcium content (6.7 mg/serving. Magnesium content found to range from 5.7 mg/serving for Royal Umberella rice to 16.3 mg/serving for Ruzzana rice. Consumption of one serving of Harvest cooked rice will cover 13.5% of the daily requirement of protein for females and 11.1% for males. Manganese content of one serving of Harvest, Sun White, Abu bent and La Cigala will cover 22.2% of the daily requirements for females and 14.7% for males, while consumption of one of Basmati, Sos rice or Amber will cover only 11.1% and 8.75 of requirement for females and males respectively. Planning a healthful diet is not a simple task. Dietary Reference Intake planning and assessing the diets of individuals or groups of healthy individuals according to their stage of life and sex. Food choice is a function of many factors, including personal preferences, habits, ethnic heritage and tradition. Dietary guidelines for Americans, consider whole grain products like rice are among the food groups that form the basis of a healthy diet. Including rice as part of a healthy, balanced diet can be linked to overall healthier eating patterns. Rice eaters are more likely to eat a diet consistent with the 2005 Dietary

  6. Risk factors for chronic noncontiguous diseases: Twelve-week prospective study

    Directory of Open Access Journals (Sweden)

    Lapčević Mirjana

    2004-01-01

    basis of RF number and combination for genesis and development of CND in our sample, 74.7% of variability (development or risk may be accounted for angina pectoris (AP, 74.2% for DM+HTA, 70.0% for DM, 79.9% for HTA, 80.8% for myocardial infarction (Ml, and 85.8% of variability (development or risk for cerebrovascular insult (CVI. Twelve-week intervention resulted in reduction of HTA, HLP, glucose, and PC (p<0.001 levels as well as lower BMI and PA (p<0.5. To accomplish the aforementioned goals, continuous mutual activity of an individual, his/her family, health service and community is required, along with occasional evaluation of the obtained results.

  7. Experiencing a constructivist museum exhibit: A case study of twelve children and their families

    Science.gov (United States)

    Hill, Martha Anne Leech

    2002-04-01

    The American Association for the Advancement of Science and the National Research Council have called for the creation of a scientifically literate populace and introduced science standards and guidelines to direct this process. Science education in traditional school settings plays a key role in reaching this goal, but individuals over their lifetimes will have more exposure to science ideas through informal science experiences such as visits to museums and through diverse media sources. The purpose of this study was to explore the role museums play in this journey to science literacy. This qualitative collective case study examined the experience of 12 children and their families in a children's museum as they interacted with an exhibit designed along the tenets of constructivist theory to introduce children to ideas of science. Twelve children and their families were videotaped interacting with a model of a watershed that included the stream, surrounding land, gravel, and dam building and erosion abatement manipulatives. Children were interviewed to ascertain their stream-related ideas and conceptual understanding prior to and after using the exhibit. Parents completed demographic and post-exhibit experience questionnaires. Two museum staff members who played key roles in the development of the exhibit and surrounding gallery were also interviewed. Individual and cross-case analyses were done to describe the experience of each child and family, and to elucidate the commonalities of these experiences to describe the phenomenon of using a constructivist-based science exhibit. Results of the study indicate (1) the type of experience children and families had at the exhibit depended on child and parent interactions and roles each assumed, and (2) experience with the exhibit encouraged children to think more deeply about water topics, past experiences, and ideas they had previously constructed. Implications of this research include (1) parents should engage children

  8. [Risk factors for chronic noncontiguous diseases: twelve-week prospective study].

    Science.gov (United States)

    Lapcević, Mirjana; Vuković, Mira

    2004-01-01

    RF number and combination for genesis and development of CND in our sample, 74.7% of variability (development or risk) may be accounted for angina pectoris (AP), 74.2% for DM+HTA, 70.0% for DM, 79.9% for HTA, 80.8% for myocardial infarction (MI), and 85.8% of variability (development or risk) for cerebrovascular insult (CVI). Twelve-week intervention resulted in reduction of HTA, HLP, glucose, and PC (p<0.001) levels as well as lower BMI and PA (p<0.5). To accomplish the aforementioned goals, continuous mutual activity of an individual, his/her family, health service and community is required, along with occasional evaluation of the obtained results.

  9. Further Tests of Changes in Fish Escape Behavior Resulting from Sublethal Stresses Associated with Hydroelectric Turbine Passage

    Energy Technology Data Exchange (ETDEWEB)

    Ryon, M.G.

    2004-10-20

    Fish that pass through a hydroelectric turbine may not be killed directly, but may nonetheless experience sublethal stresses that will increase their susceptibility to predators (indirect mortality). There is a need to develop reliable tests for indirect mortality so that the full consequences of passage through turbines (and other routes around a hydroelectric dam) can be assessed. The most commonly used laboratory technique for assessing susceptibility to predation is the predator preference test. In this report, we evaluate the field application of a new technique that may be valuable for assessing indirect mortality, based on changes in a behavioral response to a startling stimulus (akin to perceiving an approaching predator). The behavioral response is a rapid movement commonly referred to as a startle response, escape response, or C-shape, based on the characteristic body position assumed by the fish. When viewed from above, a startled fish bends into a C-shape, then springs back and swims away in a direction different from its original orientation. This predator avoidance (escape) behavior can be compromised by sublethal stresses that temporarily stun or disorient the fish. Initial studies demonstrated that turbulence created in a small laboratory tank can alter escape behavior. As a next step, we converted our laboratory design to a more portable unit, transported it to Alden Research Laboratory in Holden, Massachusetts, and used it to test fish that passed uninjured through a pilot-scale turbine runner. Rainbow trout were either passed through the turbine or exposed to handling stresses, and their behavior was subsequently evaluated. Groups of five fish were given a startle stimulus (a visual and pressure wave cue) and filmed with a high-speed (500 frames per s) video camera. The reactions of each group of fish to the startle stimulus were filmed at nominally 1-, 5-, and 15-min post-exposure. We compared the behaviors of 70 fish passed through the turbine

  10. Influence of environmental parameters on the concentration of subsurface dissolved methane in two hydroelectric power plants in Brazil

    Science.gov (United States)

    Silva, M. G.; Marani, L.; Alvala, P. C.

    2013-12-01

    Methane (CH4) is a trace gas in the atmosphere of great importance for atmospheric chemistry as one of the main greenhouse gases. There are different sources with the largest individual production associated with the degradation of organic matter submerged in flooded areas. The amount of dissolved methane that reaches the surface depends on the production in the sediments and consumption in the water column. Both processes are associated with microbial activity and consequently dependent on the physico-chemical environmental conditions. The construction of hydroelectric dams cause flooding of areas near the river that can change the characteristics of the environment and cause changes in subsurface methane concentration. In this work, we studied two hydroelectric plants located in Brazil: Batalha (17°20'39.52"S, 47°29'34.29"W), under construction when the samples were take, and Itaipu (25°24'45.00"S, 54°35'39.00"W) which has been floated over 30 years ago. The water samples to determine dissolved methane were collected approximately 5 cm near the surface. In each collection point was measured depth, water temperature, pH and redox potential. The range of dissolved methane between the two dams was similar: 0.07-10.33 μg/l (Batalha) and 0.15-10.93 μg/l (Itaipu). However, the Batalha's average (4.04 × 3.43 μg/l; median = 3.66 μg/l) was higher than that observed in Itaipu (2.15 × 1.59 μg/l; median = 2.53 μg/l). The influence of environmental parameters on the concentration of dissolved methane was evaluated by multivariate statistical techniques (Principal Component Analysis - PCA). All of the parameters had some correlation with dissolved methane, however, the greatest contribution in Batalha was associated with pH while in Itaipu was the depth. The pH variation of the various points studied in Batalha may be associated with periods of drought and flooding of the river and hence the incorporation of organic matter in the environment. The organisms

  11. A less expensive solution for thrust-bearing failures at the Sao Simao hydroelectric power plant - Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Porto, Licinio Cesar [Sinergia Engenheiros Consultores Ltda., Belo Horizonte, MG (Brazil)]. E-mail: licinio@sinergia.eng.br; Machado, Luiz; Koury, Ricardo Nicolau Nassar; Porto, Matheus Pereira; Coelho, Fernanda Gomes [Universidade Federal de Minas Gerais (UFMG), Belo Horizonte, MG (Brazil). Dept. de Engenharia Mecanica]. E-mails: luizm@demec.ufmg.br; koury@ufmg.br; matheusporto@oi.com.br; fernanda@sinergia.eng.br

    2008-07-01

    After twenty years without any apparent problems on their combined guides and thrust bearings operations, the six 280 MW hydrogenerators of the Sao Simao Hydroelectric Power Plant of Brazil were failing. Sao Simao is the largest Power Plant of Companhia Energetica de Minas Gerais (CEMIG), one of the major Brazilian electric utility company, with a total installed potential higher than 5,400 MW. The source of the failure was the melting of the thrust pad Babbit lining. The machines began showing performance failures, leading to a sudden interruption in their operations. This caused considerable losses with high direct and indirect costs. The solution proposed by the bearing manufacturer was an improvement to the bearing design and the installation of new water-oil heat exchangers. The direct cost of their solution was estimated at US$ 2,000,000.00 (two million dollars). In a search for a less expensive alternative, CEMIG commenced a parallel study that was to focus on the heat exchangers. A calculation model was used to consider not only the thermal features of the oil circulation system but also the suitability of its pumps and piping system. This model predicted that an increase in the surface of the heat exchange area could solve the problem. A spare heat exchanger was then installed in one machine already possessing two heat exchangers. The rated output test results fulfilled preliminary predictions, eliminating the risk of additional Babbit lining failures. As a consequence of CEMIG's successful modeling test implementation, heat exchangers were added to the remaining machines. This alternative solution had a total direct cost of US$ 600,000.00 (six hundred thousand dollars) with an indirect cost much less than the alternative presented by the manufacturer for its short cessation period. This paper discusses in detail all this study stages. (author)

  12. Phlebotomine Fauna (Diptera: Psychodidae) and Putative Vectors of Leishmaniases in Impacted Area by Hydroelectric Plant, State of Tocantins, Brazil

    Science.gov (United States)

    Vilela, Maurício Luiz; Azevedo, Carina Graser; Carvalho, Bruno M.; Rangel, Elizabeth F.

    2011-01-01

    Background Although leishmaniases are regarded as serious public health issues in the State of Tocantins, as consequence of the impact of environmental changes, small advances in taxonomic and ecological studies of Phlebotominae fauna are taking place in this state. The present study aimed to improve the knowledge about the sand flies, as well as about the aspects of the bioecology of leishmaniases vectors from Porto Nacional, a city that was directly impacted by the construction of Luís Eduardo Magalhães Hydroelectric Plant (HEP – Lajeado). Methodology/Principal Findings Sand flies were collected monthly using CDC light traps and Shannon traps for a period of 40 consecutive months, at different monitoring stations, where 7162 specimens were collected and 48 species were detected. Among the species found, 22 are first records in the state and seven are considered important vectors of leishmaniases. Lutzomyia longipalpis, the vector of American Visceral Leishmaniasis (AVL) showed higher frequency in urban compared to rural areas, and Nyssomyia whitmani, the vector of American Cutaneous Leishmaniasis (ACL), predominated in rural areas. The frequency and habits of sand fly vectors are discussed considering environmental characteristics and climatic factors. Conclusions/Significance The construction of dams requires a great amount of labor, therefore attracting people from elsewhere. Increased migration, without adequate structure, leads to bad living conditions in new and unplanned settlements. It also leads to deforestation associated with environmental impacts, which can facilitate the spread of leishmaniases. This study discusses the importance of Lu. longipalpis and Ny. whitmani on the transmission cycles of leishmaniases in Porto Nacional and the record of Bi. flaviscutellata in periurban area of the city. PMID:22163271

  13. Developing the aquatic-coupled reservoir model to simulate carbon dioxide emission from a young boreal hydroelectric reservoir

    Science.gov (United States)

    Kim, Y.; Roulet, N. T.; Strachan, I. B.; Tremblay, A.

    2013-12-01

    We developed a process-based biogeochemical reservoir model, called AF-DNDC (Aquatic-coupled Forest-DNDC), to project carbon (C) flux from water surface of a recently created hydro-electric reservoir that flooded a boreal landscape. The basis of the reservoir model is Forest-DNDC, a biogeochemical model for C and nitrogen cycling in forests and wetlands. AF-DNDC was developed by coupling a lake C model to a flooded version of Forest-DNDC. AF-DNDC includes the C cycling through the aquatic carbon pools, such as DIC (dissolved inorganic C), DOC (dissolved organic C), and planktonic community as well as C exchange between air, water, and sediment. AF-DNDC was used to examine the net change in carbon dioxide (CO2) exchange between the surface and the atmosphere over the first seven years post flooding of the Eastmain-1 reservoir in northern Quebec. With present day climate and environmental conditions, simulated daily CO2 emissions from the flooded forest averaged 1.69 g C m-2 d-1 (range 0 to 20.49), and from the flooded peatland averaged 0.87 g C m-2 d-1 (range 0 to 6.86). Simulated CO2 emissions decreased with the age of reservoir. They were larger than eddy-covariance measured CO2 fluxes from the water surface over flooded forests, but compared well to the eddy-covariance fluxes during the open-water period. The simulated emissions were significantly correlated with the measured fluxes from the flooded forest (r2 = 0.33; p < 0.01) and flooded peatland (r2 = 0.41; p < 0.01). The patterns over the year were similar. AF-DNDC is suitable for use to assess the major changes in CO2 exchange due to the creation of reservoirs in boreal regions.

  14. The new political scales of citizenship in a global era: The politics of hydroelectric development in the James Bay Region

    Science.gov (United States)

    Rousseau, Jean

    2000-10-01

    In this dissertation, I examine the current reconfiguration of citizenship in Western societies in a period marked by the expansion of globalisation. Specifically, I focus on the spatial implications of globalisation via a comparative analysis of the politics of hydroelectric development, in the James Bay region of Quebec, Canada. I discuss the struggles surrounding its two main phases: the construction of the La Grande complex (1970--1975) and the aborted launching of the Great Whale project (1988--1994). I pay close attention to the mobilisation of the Cree people and ecology groups who launched successive campaigns to prevent the construction of both projects, reflecting what I depict as process of jumping scales. Whereas their campaigns were unsuccessful during the first phase, they became much more potent during the second phase. This transition reveals an important remapping of citizenship politics through which its national and territorial scales are being unbundled and no longer exclusively restricted to national state borders. As a result, citizenship politics becomes embedded in various locales---from the local to the emerging global. Each represents a political scene in which citizens can make claims and participate in debates around the recognition of their rights. This dissertation would contribute to the debates on citizenship and globalisation. It suggests that globalisation not only imposes new constraints on citizenship policies from above, but also creates now spaces in which citizenship is reframed or rather, rescaled. This dissertation also provides insights into the implications of globalisation. It illustrates how the globalisation of politics results from non-state actors, reflecting what is called "globalisation from below". This reveals contradictory forms of globalisation and implicitly, different political projects.

  15. The Effects of Run-of-River Hydroelectric Power Schemes on Fish Community Composition in Temperate Streams and Rivers.

    Directory of Open Access Journals (Sweden)

    Gary S Bilotta

    Full Text Available The potential environmental impacts of large-scale storage hydroelectric power (HEP schemes have been well-documented in the literature. In Europe, awareness of these potential impacts and limited opportunities for politically-acceptable medium- to large-scale schemes, have caused attention to focus on smaller-scale HEP schemes, particularly run-of-river (ROR schemes, to contribute to meeting renewable energy targets. Run-of-river HEP schemes are often presumed to be less environmentally damaging than large-scale storage HEP schemes. However, there is currently a lack of peer-reviewed studies on their physical and ecological impact. The aim of this article was to investigate the effects of ROR HEP schemes on communities of fish in temperate streams and rivers, using a Before-After, Control-Impact (BACI study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 23 systematically-selected ROR HEP schemes and 23 systematically-selected paired control sites. Six area-normalised metrics of fish community composition were analysed using a linear mixed effects model (number of species, number of fish, number of Atlantic salmon-Salmo salar, number of >1 year old Atlantic salmon, number of brown trout-Salmo trutta, and number of >1 year old brown trout. The analyses showed that there was a statistically significant effect (p<0.05 of ROR HEP construction and operation on the number of species. However, no statistically significant effects were detected on the other five metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future fish community impact studies.

  16. The impact of organochlorines and metals on wild fish living in a tropical hydroelectric reservoir: bioaccumulation and histopathological biomarkers.

    Science.gov (United States)

    Paulino, Marcelo Gustavo; Benze, Tayrine Paschoaletti; Sadauskas-Henrique, Helen; Sakuragui, Marise Margareth; Fernandes, João Batista; Fernandes, Marisa Narciso

    2014-11-01

    This study evaluates the contaminants in water and their bioaccumulation in the gills and liver of two ecologically distinct fish species, Astyanax fasciatus and Pimelodus maculatus, living in the reservoir of the Furnas hydroelectric power station located in Minas Gerais in the southeastern Brazil. The histological alterations in these organs are also examined. Water and fish were collected in June and December from five sites (site 1: FU10, site 2: FU20, site 3: FU30, site 4: FU40 and site 5: FU50) in the reservoir, and agrochemicals and metals selected based on their use in the field crops surrounding the reservoir were analyzed in the water and in the fish gills and livers. The concentrations of the organochlorines aldrin/dieldrin, endosulfan and heptachlor/heptachlor epoxide as well as the metals copper, chromium, iron and zinc in the gills and livers of both fish species were higher in June than in December; the liver accumulated higher concentrations of contaminants than the gills. The organochlorine metolachlor was detected only in the liver. The histological pattern of changes was similar in both species with regard to contaminant accumulation in the gills and liver. Fish from FU10, the least contaminated site, exhibited normal gill structure and moderate to heavy liver damage. Fish collected at FU20 to FU50, which were contaminated with organochlorines and metals, showed slight to moderate gill damage in June and irreparable liver damage in the livers in June and December. The histological changes in the gills and liver were suitable to distinguishing contaminated field sites and are therefore useful biomarkers for environmental contamination representing a biological end-point of exposure.

  17. The Impact of the Financial Crisis on the Content of Twelve Bestselling US Principles of Economics Textbooks

    DEFF Research Database (Denmark)

    Madsen, Poul Thøis

    2013-01-01

    How have authors of twelve bestselling introductory US textbooks in economics responded to the traumatizing financial crisis? In general the financial crisis is described with a couple of lines here and there or it is dealt with in boxes, separate sections, or specific isolated chapters. Some...... of the textbooks distinguish themselves by also having made some modest qualitative changes of content as a reaction to the financial crisis (especially Colander 2010 and Krugman and Wells 2013). Applying my general analysis of the changes being made already in the twelve textbooks seen as a whole, I discuss how...... any introductory textbook could integrate the financial crisis more adequately into the general presentation, thereby hopefully contributing to enhancing the interest of the students....

  18. RUGBY GAME-RELATED STATISTICS THAT DISCRIMINATE BETWEEN WINNING AND LOSING TEAMS IN IRB AND SUPER TWELVE CLOSE GAMES

    Directory of Open Access Journals (Sweden)

    Luis Vaz

    2010-03-01

    Full Text Available The aim of the current study was to identify the Rugby game- related statistics that discriminated between winning and losing teams in IRB and S12 close games. Archival data reported to game-related statistics from 120 IRB games and 204 Super Twelve games played between 2003 and 2006. Afterwards, a cluster analysis was conducted to establish, according to game final score differences, three different match groups. Only the close games group was selected for further analysis (IRB n = 64 under 15 points difference and Super Twelve n = 95 under 11 points difference. An analysis to the structure coefficients (SC obtained through a discriminant analysis allowed to identify the most powerful game-related statistics in discriminating between winning and losing teams. The discriminant functions were statistically significant for Super Twelve games (Chi-square = 33.8, p < 0.01, but not for IRB games (Chi- square = 9.4, p = n.s.. In the first case, winners and losers were discriminated by possessions kicked (SC = 0.48, tackles made (SC = 0.45, rucks and pass (SC = -0.40, passes completed (SC = 0. 39, mauls won (SC = -0.36, turnovers won (SC = -0.33, kicks to touch (SC = 0.32 and errors made (SC = -0.32. The minus sign denotes higher values in losing teams. Rugby game-related statistics were able to discriminate between winners and losers in Super Twelve close games and suggest that a kicking based game supported by an effective defensive structure is more likely to win matches than a possession based one

  19. Radicular anatomy of twelve representatives of the Catasetinae subtribe (Orchidaceae: Cymbidieae

    Directory of Open Access Journals (Sweden)

    Cristiano Pedroso-de-Moraes

    2012-06-01

    Full Text Available Considering that the root structure of the Brazilian genera belonging to the Catasetinae subtribe is poorly known, we describe the roots of twelve representatives from this subtribe. For anatomical analysis, the roots were fixed in FAA 50, preserved in ethanol 70% and sectioned at its medium region using razor blades. The sections were stained with 0.05% astra blue and safranin and mounted in glycerin. For the identification of starch we used Lugol's solution; for lignin, floroglucin chloridric; for lipids, Sudan III, and for flavanoids, potassium hydroxide. The relevant aspects were registered using a digital camera joined with an Olympus microspope (BX51 model. The structural similarities of all roots support the placement of the subtribe Catasetinae into the monophyletic tribe Cymbidieae. Some root features are restricted to one or two taxa and can be useful in the systematics of the subtribe. For example, the occurrence of flavonoidic crystals characterizes the genera Catasetum and Cychnodes, and the number of the velamen layers and the shape of the epivelamen cells are useful to confirm the taxonomic position of Clowesia amazonica. The presence of velamen and flavonoidic crystals was interpreted as an adaptation to the epiphytic habit.Considerando que a estrutura das raízes de gêneros brasileiros pertencentes à subtribo Catasetinae é pouco conhecida, descrevemos as raízes de doze representantes desta subtribo. Para análise anatômica, as raízes foram fixadas em FAA 50, preservadas em álcool 70% e seccionadas na sua região média usando lâminas de barbear. Os cortes foram corados com astra blue e Safrablau 0,05% e montados em glicerina. Para a identificação do amido, utilizou-se a solução de Lugol; da lignina, floroglucina clorídrica, dos lipídios, Sudan III e dos flavonóides, hidróxido de potássio. Os aspectos relevantes foram registrados usando câmera digital acoplada a um microscópio Olympus (modelo BX51. As semelhan

  20. Environmental impact analysis of the hydroelectric power development sheme in the River Grunnaai in Seljord municipality, Telemark; Konsekvensutredning av kraftutbyggingsprosjekt i Grunnaai i Seljord, Telemark

    Energy Technology Data Exchange (ETDEWEB)

    Muniz, I.P.; Bendiksen, E.; Erikstad, L.; Reitan, O.

    1997-12-31

    This report discusses the possible environmental consequences of a planned hydroelectric power development of the river Grunnaai, Norway. The consequences are found to be small, provided the proper counter measures are taken. Without counter measures, there may be moderate consequences on fish populations and botanical conditions, directly dependent on the changed water flow. The greatest value of the area concerned lies in its unspoiled wilderness character. There are extensive lists of birds and mammals and plant species registered in the river valley. 51 refs., 7 figs., 4 tabs.

  1. Serial DC systems applied to small-scale hydroelectric power plants; Sistemas serie em corrente continua aplicados as pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, Manuel L.B.; Rosa, Paulo C. [Escola Federal de Engenharia de Itajuba, MG (Brazil); Martinez, Carlos B. [Minas Gerais Univ., Belo Horizonte, MG (Brazil). Dept. de Engenharia Hidraulica e Recursos Hidricos

    1996-12-31

    The utilization of the remaining potential in brazilian South and Southeast regions, specially those close to the biggest demand areas, have been conditioned by the high costs of the initialization of the socio and environmental impacts. As a consequence, the viability of the traditional energy production systems (hydraulic power plants) need a revaluation of its costs, especially in what concerns the generation plants and their auxiliary systems. This paper discusses several considerations concerning of serial DC small-scale hydroelectric power plants, giving especial attention to the technical conditions and control aspects which must be observed during the planning and the project phases 9 refs., 4 figs.

  2. Overhaul of the generator of the hydroelectric central station Ingeniero Carlos Ramirez Ulloa; Rehabilitacion del generador de la unidad 2 de la central hidroelectrica ingeniero Carlos Ramirez Ulloa

    Energy Technology Data Exchange (ETDEWEB)

    Robles Pimentel, Edgar [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Garcia Hernandez, Javier [Comision Federal de Electricidad, Mexico, D. F. (Mexico)

    1997-12-31

    In November 1995, the failure of the Unit 2 generator at the hydroelectric central station Ingeniero Carlos Ramirez Ulloa, El Caracol, occurred. The accident forced to carry out its overhaul. Here are presented the technical problems faced during the overhaul of the generator and analyzed the implemented solutions. [Espanol] En noviembre de 1995 ocurrio la falla del generador de la unidad 2 de la central hidroelectrica Ing. Carlos Ramirez Ulloa, El Caracol. El accidente obligo a llevar a cabo su rehabilitacion. Se presentan los problemas tecnicos enfrentados durante la rehabilitacion del generador y se discuten las soluciones implementadas.

  3. Preliminary analysis of legal obstacles and incentives to the development of low-head hydroelectric power in the northeastern United States

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    A preliminary analysis of the legal obstacles and incentives to the development of the low-head hydroelectric potential of the 19 northeastern US (Maine, New Hampshire, Vermont, Massachusetts, Rhode Island, Connecticut, New York, New Jersey, Pennsylvania, Ohio, Indiana, Michigan, Illinois, Wisconsin, Kentucky, Maryland, Delaware, Virginia, and West Virginia) is presented. The statutes and case laws of the 19 states and the Federal government which affect developers of small dams are stressed. The legal uncertainty which confronts the developer of small dams and the regulatory burden to which the developer may be subjected once the uncertainty is resolved are emphasized.

  4. Mathematical Modeling in Systems for Operational Evaluation of the Stress-Strain State of the Arch-Gravity Dam at the Sayano-Shushenskaya Hydroelectric Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Bellendir, E. N.; Gordon, L. A., E-mail: lev-gordon@mail.ru; Khrapkov, A. A.; Skvortsova, A. E., E-mail: SkvortsovaAE@vniig.ru [B. E. Vedeneev All-Russia Research Institute of Hydraulic Engineering (VNIIG) (Russian Federation)

    2017-01-15

    Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.

  5. Rural electrification in Santarem: contribution of micro hydroelectric power plants; Eletrificacao rural em Santarem: contribuicao das micro centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Els, Rudi Henri Van; Diniz, Janaina Deane De Abreu Sa; Souza, Josiane do Socorro Aguiar de; Brasil Junior, Antonio Cesar Pinho; Sousa, Antonio Nazareno Almada de [Universidade de Barsilia (UnB), DF (Brazil). Lab. de Energia e Ambiente; Kroetz, Jaemir Grasiel [Indalma Industria e Comercio, Santarem, PA (Brazil)

    2010-07-01

    The municipality of Santarem in the lower Amazon river is the main center in the western region of the state of Para with a population of 274.285 inhabitants, with 31.633 of them living in the rural zone, where only 1.060 rural costumers have access to regular electricity service from the utility provider. This incipient coverage of electricity service in the rural zone urged the local population to look for alternatives. This was found in the use of the hydraulic potential of creeks and rivers with rapids and waterfalls to implement pico and micro hydroelectric plants. So since 2001, 44 pico and 12 micro hydropower plants were installed in the municipalities of Santarem, Belterra and Uruara in the state of Para by local entrepreneurs and communities to attend their basic electricity needs. These systems attend approximately 580 families with a total installed capacity of more than 700 kVA. The consolidation of this technological alternative induced the Regional Superintendent of the Institute for Colonization and Land Reform (INCRA) and the Municipality of Santarem to elaborate a project to attend the land reform settlements in the region. This led to the installation of 6 micro hydropower (MHP) with a total installed capacity of 820kVA and a 252 km distribution network to attend 1.630 families in the settlements of Moju and Corta Corda. The purpose of this paper is to present the MHP's installed in the region and to show the contribution of these units in the rural electrification of rural settlements in Santarem. The paper discusses also the management model of these units. The survey's methodology consisted in the systematization of project data from the plant builder, INCRA and the municipality. The information was obtained from the official bibliography from the local actors and complemented by field surveys with interviews and observation. Despite the fact that the MHP's are in operation, they are not yet registered in the data base of the

  6. Erosion Control and Recultivation Measures at a Headrace Channel of a Hydroelectric Power Plant using Different Combined Soil Bioengineering Techniques

    Science.gov (United States)

    Obriejetan, M.; Florineth, F.; Rauch, H. P.

    2012-04-01

    vegetation properties are studied by setting up comparative test plots at a field study site located at a headrace channel of a hydroelectric power plant. Different vegetational parameters such as basal coverage, species richness, species composition, abundance/dominance values by using a refined Braun-Blanquet cover estimation scale were collected as well as local environmental properties. Results during the first vegetation period show distinct effects of geotextiles especially on overall vegetation coverage and grasses-herbs-ratio. Geotextile supported plots show 20% higher overall coverage but lower amount of herbs after three months of vegetation growth compared to control plots without installation of auxiliary materials. Furthermore coir blankets reveal higher penetration resistance for seed leaves of herbal plants compared to coir nettings. Hence technical erosion protection products, biological components and it's combination have to be closely coordinated in order to achieve specified revegetation objectives and meet long-term functionality.

  7. Controversies on Energy: Fossil, hydroelectric, nuclear, renewable; Les controverses de l'energie. Fossile, hydroelectrique, nucleaire, renouvelable

    Energy Technology Data Exchange (ETDEWEB)

    Romerio, F

    2007-07-01

    In Switzerland, energy policy was the subject of several referendums and decision takings in the past few decades. This book explains the numerous aspects to be considered when choosing a strategy which should warrant in the future a sufficient and safe access to energy, with a special emphasis on electric power. There is a tight, but not linear, coupling between the price of energy and the economic development. The pollution of environment induced by the use of fossil energy jeopardizes the survival of our Earth planet. Modeling the effects of the pollution is difficult and inaccurate because of complex feedbacks. In order to conciliate development progress, energy and environment, technology is needed but at the same time involves risks. In order to warrant the life quality in the long run, it is necessary to move to a sustainable development, which implies technological progress and changing the individual behaviours. The safety of the energy supply is warranted by diversifying the energy sources. But accurately define the mid and long term goals and also adapt the instruments which should enable their achievement, is a very demanding task. Privatising the electricity production and distribution networks leads in principle to increasing competition, but the electricity price becomes very variable with huge daily and seasonal fluctuations. To date, Switzerland counts 900 electric utilities. Opening the electricity market induces concentration and company merges. To promote an energy strategy, it is necessary to face in a lump the technological, economical and social realities. In the long run, renewable energies: small-scale hydroelectric power plants, biomass, wind, photovoltaics, geothermal energy, should have an important share in electricity production. In the mid term, natural gas and nuclear reactors will be used as transition energy sources. But all electric power plants, whenever nuclear or gas, or even renewable (as for instance wind power plants) must

  8. Application of multiregressive linear models, dynamic kriging models and neural network models to predictive maintenance of hydroelectric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Lucifredi, A.; Rossi, M. [University of Genova (Italy). DIMEC; Mazzieri, C. [ANSALDO RICERCHE, Genova (Italy)

    2000-07-01

    Since the operational conditions of a hydroelectric unit can vary within a wide range, the monitoring system must be able to distinguish between the variations of the monitored variable caused by variations of the operation conditions and those due to arising and progressing of failures and misoperations. The paper aims to identify the best technique to be adopted for the monitoring system. Three different methods have been implemented and compared. Two of them use statistical techniques: the first, the linear multiple regression, expresses the monitored variable as a linear function of the process parameters (independent variables), while the second, the dynamic kriging technique, is a modified technique of multiple linear regression representing the monitored variable as a linear combination of the process variables in such a way as to minimize the variance of the estimate error. The third is based on neural networks. Tests have shown that the monitoring system based on the kriging technique is not affected by some problems common to the other two models e.g. the requirement of a large amount of data for their tuning, both for training the neural network and defining the optimum plane for the multiple regression, not only in the system starting phase but also after a trivial operation of maintenance involving the substitution of machinery components having a direct impact on the observed variable. Or, in addition, the necessity of different models to describe in a satisfactory way the different ranges of operation of the plant. The monitoring system based on the kriging statistical technique overrides the previous difficulties: it does not require a large amount of data to be tuned and is immediately operational: given two points, the third can be immediately estimated; in addition the model follows the system without adapting itself to it. The results of the experimentation performed seem to indicate that a model based on a neural network or on a linear multiple

  9. Modeling strategic competition in hydro-thermal electricity generation markets with cascaded reservoir-hydroelectric generation plants

    Science.gov (United States)

    Uluca, Basak

    This dissertation aims to achieve two goals. The first is to model the strategic interactions of firms that own cascaded reservoir-hydro plants in oligopolistic and mixed oligopolistic hydrothermal electricity generation markets. Although competition in thermal generation has been extensively modeled since the beginning of deregulation, the literature on competition in hydro generation is still limited; in particular, equilibrium models of oligopoly that study the competitive behavior of firms that own reservoir-hydro plants along the same river in hydrothermal electricity generation markets are still under development. In competitive markets, when the reservoirs are located along the same river, the water released from an upstream reservoir for electricity generation becomes input to the immediate downstream reservoir, which may be owned by a competitor, for current or future use. To capture the strategic interactions among firms with cascaded reservoir-hydro plants, the Upstream-Conjecture approach is proposed. Under the Upstream-Conjecture approach, a firm with an upstream reservoir-hydro plant assumes that firms with downstream reservoir-hydro plants will respond to changes in the upstream firm's water release by adjusting their water release by the same amount. The results of the Upstream Conjecture experiments indicate that firms that own upstream reservoirs in a cascade may have incentive to withhold or limit hydro generation, forcing a reduction in the utilization of the downstream hydro generation plants that are owned by competitors. Introducing competition to hydroelectricity generation markets is challenging and ownership allocation of the previously state-owned cascaded reservoir-hydro plants through privatization can have significant impact on the competitiveness of the generation market. The second goal of the dissertation is to extract empirical guidance about best policy choices for the ownership of the state-owned generation plants, including the

  10. The portfolio theory applied to small hydroelectric power plants; Teoria do portfolio aplicada a pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Bastos, Paulo Roberto Ferreira de Moura

    2002-07-01

    The 'Portfolio Theory' has been largely employed on stock markets, aiming to improve the relation between risk and return. This theory identifies many possible investment combinations once it's associated with the idea that increasing investment diversification can lower risk. The objective is, thus identify the portfolio that offers the most efficient diversification of capital. The reforms on the energy sector in Brazil have made investments on both generation and commercialization of electric energy easier for medium sized investors. There have been economic incentives to the exploration of wind and bio-mass energy, and to the construction of small hydro-electric power plants (in Portuguese, PCH), as well as many legal and regulatory mechanisms pursuing the maintenance of elevate rates of participation of renewable source in the production of electrical energy in Brazil. Between these options, the PCH are a specially good opportunity taking account of its minimum environment impact, low operational costs and total technologic control. The decision concerning investment options has been based on standard economic analysis like 'Net Present Value', 'Payback Time' or 'Cost/Benefit Relations'. Other techniques such as scenario and sensitivity have been incorporated and, more recently, there has been a search for other methods consider the uncertainty of happenings within the horizon of study. This dissertation will analyse six possibilities of PCH with standard techniques. Of them, the four possibilities considered viable will constitute our examples for the application of Portfolio Theory techniques. Once the active portfolio is determined, the best option is identified using the 'mean-variance efficient' developed by Markowitz, concluding that the theory can give better support to the decision-making in future enterprises on the electric sector. After considering the optimal return/risk combinations, there was

  11. Use of social communication as a tool for environmental licensing of small-scale hydroelectric power plants; Uso da comunicacao social como instrumento para o licenciamento ambiental de PCH - pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Tiago Filho, Geraldo Lucio [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Inst. de Recursos Naturais], e-mail: tiago@unifei.edu.br; Galhardo, Camila Rocha [Centro Nacional de Referencia em Pequenas Centrais Hidreletricas (CERPCH), MG (Brazil)], e-mail: pchnoticias@unifei.edu.br

    2006-07-01

    The present work intends to study the process of environmental licensing of the Small ones Central Hydroelectric (PCHs) through the rising of the legal framework of the referred process and to analyze the application of tools of social communication in the mitigation of the social impacts in the zone of influence of the enterprise. Through the analysis of the critical points in the environmental licensing of small hydroelectric uses and evaluation of communication actions taking in consideration the environmental costs for the enterprise. (author)

  12. A CUSUM analysis of discharge patterns by a hydroelectric dam and discussion of potential effects on the upstream migration of American eel elvers

    Energy Technology Data Exchange (ETDEWEB)

    Jessop, B.M.; Harvie, C.J. [Department of Fisheries and Oceans, Dartmouth, NS (Canada). Bedford Inst. of Oceanography

    2003-07-01

    American eel elvers are among the diadromous fishes native to the Saint John River in New Brunswick that have been affected by the construction of hydroelectric dams. Before 1980, large numbers of elvers were observed entering the fishway of the Mactaquac Dam in May and June for upstream migration, but their presence abruptly ceased after 1980. A study was conducted to determine why they disappeared at the Mactaquac Dam. A cumulative sum (CUSUM) analysis was performed to determine the variability in magnitude, duration, timing, frequency, and rate of change in the daily and seasonal average level of water discharge associated with the installation of the last two of six turbines in late 1979 and early 1980. It is believed that the rapid, short-term fluctuations in water discharge which is characteristic of peaking hydroelectric dam operations, could seriously affect life cycle transitions of diadromous fishes. Upstream and downstream migration of the elvers may be affected along with their abundance, diversity and productivity. Young fish in particular are at higher risk of mortality during high flows, depending on the species. 40 refs., 3 tabs., 10 figs.

  13. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: South Columbia Basin Irrigation District, Pasco, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, L.

    1980-05-01

    The case study concerns two modern human uses of the Columbia River - irrigation aimed at agricultural land reclamation and hydroelectric power. The Grand Coulee Dam has become synonomous with large-scale generation of hydroelectric power providing the Pacific Northwest with some of the least-expensive electricity in the United States. The Columbia Basin Project has created a half-million acres of farmland in Washington out of a spectacular and vast desert. The South Columbia River Basin Irrigation District is seeking to harness the energy present in the water which already runs through its canals, drains, and wasteways. The South District's development strategy is aimed toward reducing the costs its farmers pay for irrigation and raising the capital required to serve the remaining 550,000 acres originally planned as part of the Columbia Basin Project. The economic, institutional, and regulatory problems of harnessing the energy at site PEC 22.7, one of six sites proposed for development, are examined in this case study.

  14. A critical analysis of the environment impact assessment report of the 2000 MW lower subansiri hydroelectric project with special reference to the down stream ecology and people's livelihood.

    Science.gov (United States)

    Baruah, Debojit; Dutta, Ranjit; Hazarika, Lakhi Prasad; Sarmah, Sarada Kanta

    2011-10-01

    The Environment Impact Assessment (EIA) report of the 2000 MW Lower Subansiri Hydroelectric Project prepared by the WAPCOS (Water and Power Consultancy Service, 2003) indicates that downstream survey was done only up to 7 km from the dam site without giving much importance to the actual scenario and avoiding some most crucial ecological aspects. In the report, insufficient records of terrestrial flora, phytoplanktons and fish diversity are given. No records of aquatic macrophytes, riparian flora, zooplanktons, avian fauna, floodplain crops, besides peoples' livelihood and diverse habitat provided by the river in its downstream are presented in the report. Especially the wetlands, associated and influenced by the unregulated Subansiri River did not find any place in the EIA report. Interestingly, no mention of the Ganges Dolphin--Platanista gangetica gangetica Roxb. could be found in the report, whereas the river provides a healthy habitat for a good number of this critically endangered fresh water dolphin. From our pre-impact study, it is clear that rich downstream ecology of the river with its present and existing environmental scenario will be adversely affected due to the construction and operation of the proposed project, and there will be distinct possibilities of elimination of other native species. In addition, people's livelihood will be affected largely through alteration of the flow regime of the river. In-depth study with comprehensive documentation of all biotic and abiotic parameters is obligatory before taking any decision about the operation of the 2000 MW Lower Subansiri Hydroelectric Project.

  15. Impacts of the Garafiri hydroelectric dam on the Konkoure estuary; Impacts du barrage hydroelectrique de Garafiri sur l'estuaire du Konkoure

    Energy Technology Data Exchange (ETDEWEB)

    Samoura, K. [Secretariat international francophone pour l' evaluation environnemental, Montreal, PQ (Canada); Waaub, J.P. [Quebec Univ., Montreal, PQ (Canada). Dept. de Geographie

    2008-09-15

    This article described the environmental impacts caused by the exploitation of one or several dams in tropical coastal basins. In particular, it proposed a methodological approach for analyzing the vulnerability of ecosystems to modifications caused by the exploitation of the Garafiri hydroelectric dam in Guinea. With an installed power capacity of 75 MW, this dam has been operational since 1999 and has supplied electricity to coastal and mid Guinea since 2000. Since then, the ecosystem of the Konkoure River has undergone important changes. This study focused primarily on impacts during the dry season. Data was collected at different hydroelectric stations along the Konkoure Basin to estimate changes in water flow in the estuary. The study showed several changes, including noticeable impacts on the soil salt content. In addition, changes in vegetation were attributed to changes in soil content. The study revealed that rice production has increased 65 per cent since 2000, while salt exploitation has been completely discontinued. It was concluded that the hydraulic management of the dam can have a significant impact on the region's ecosystem which can in turn influence ecological and social economic functions. It was concluded that the vulnerability of the ecosystem can be worsened in the context of climate change. 25 refs., 9 figs.

  16. Evaluation of mosquito (Diptera: Culicidae) species richness using two sampling methods in the hydroelectric reservoir of Simplício, Minas Gerais, Brazil.

    Science.gov (United States)

    Alencar, Jeronimo; de Mello, Viviane Soares; Serra-Freire, Nicolau Maués; Silva, Júlia dos Santos; Morone, Fernanda; Guimarães, Anthony Érico

    2012-04-01

    We compared two types of light traps used for monitoring mosquito abundance in the hydroelectric reservoir of Simplício, Além Paraíba - Minas Gerais. Mosquitoes were captured bimonthly using automatic CDC and Shannon traps before the filling of the hydroelectric plant reservoir from December 2008 to December 2009. In total, 1474 specimens from 13 genera were captured. Among the captured specimens, several species known to be vectors of disease-causing agents for humans and/or animals were identified, including Anopheles aquasalis, Aedes albopictus, Coquillettidia venezuelensis, Haemagogus leucocelaenus, and Aedes scapularis. Sampling efficacy between the four capture sites was not found to be significantly different, irrespective of species captured or type of trap used. Poor correlation (r (x, y) = -0.0444) between the number of mosquito species and capture site was observed when not influenced by the type of trap used. Among the installation sites of the CDC and Shannon traps in the areas investigated, CDC traps fixed in livestock shelters obtained an overall higher abundance of species captured.

  17. Further Tests of Changes in Fish Escape Behavior Resulting from Sublethal Stresses Associated with Hydroelectric Turbine Passage

    Energy Technology Data Exchange (ETDEWEB)

    Ryon, M.G.

    2004-10-20

    Fish that pass through a hydroelectric turbine may not be killed directly, but may nonetheless experience sublethal stresses that will increase their susceptibility to predators (indirect mortality). There is a need to develop reliable tests for indirect mortality so that the full consequences of passage through turbines (and other routes around a hydroelectric dam) can be assessed. The most commonly used laboratory technique for assessing susceptibility to predation is the predator preference test. In this report, we evaluate the field application of a new technique that may be valuable for assessing indirect mortality, based on changes in a behavioral response to a startling stimulus (akin to perceiving an approaching predator). The behavioral response is a rapid movement commonly referred to as a startle response, escape response, or C-shape, based on the characteristic body position assumed by the fish. When viewed from above, a startled fish bends into a C-shape, then springs back and swims away in a direction different from its original orientation. This predator avoidance (escape) behavior can be compromised by sublethal stresses that temporarily stun or disorient the fish. Initial studies demonstrated that turbulence created in a small laboratory tank can alter escape behavior. As a next step, we converted our laboratory design to a more portable unit, transported it to Alden Research Laboratory in Holden, Massachusetts, and used it to test fish that passed uninjured through a pilot-scale turbine runner. Rainbow trout were either passed through the turbine or exposed to handling stresses, and their behavior was subsequently evaluated. Groups of five fish were given a startle stimulus (a visual and pressure wave cue) and filmed with a high-speed (500 frames per s) video camera. The reactions of each group of fish to the startle stimulus were filmed at nominally 1-, 5-, and 15-min post-exposure. We compared the behaviors of 70 fish passed through the turbine

  18. Hydroelectric generating site signage

    Energy Technology Data Exchange (ETDEWEB)

    Bentley, K. [British Columbia Hydro, Vancouver, BC (Canada)

    1997-04-01

    Recreational sites have been developed at several BC Hydro reservoirs. These sites are visited by approximately 800,000 people annually and therefore, require consistent control measures to ensure public safety and to restrict public access to hazardous areas. BC Hydro is in the process of establishing a province-wide standard in which layout, colour, description of hazards, BC Hydro identity and sign placement would follow an established set of criteria. Proposed signs would consist of a pictograph and a printed warning below. Preliminary designs for 16 of the signs were presented. 16 figs.

  19. VT Potential Hydroelectric Sites

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The Renewable Energy Atlas of Vermont and this dataset were created to assist town energy committees, the Clean Energy Development Fund and other...

  20. VT Existing Hydroelectric Sites

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The Renewable Energy Atlas of Vermont and this dataset were created to assist town energy committees, the Clean Energy Development Fund and other...

  1. Ocular hypotensive effect, preservation of visual fields, and safety of adding dorzolamide to prostaglandin therapy for twelve months

    Directory of Open Access Journals (Sweden)

    Kenji Inoue

    2011-03-01

    Full Text Available Kenji Inoue1,3, Mieko Masumoto1,3, Masato Wakakura1, Goji Tomita2, On behalf of the Ochanomizu Ophthalmology Study Group31Inouye Eye Hospital, Tokyo, Japan; 2Department of Ophthalmology, Toho University School of Medicine, Tokyo, Japan; 3Ochanomizu Ophthalmology, Tokyo, JapanPurpose: To prospectively evaluate the safety, hypotensive effect, and preservation of visual fields of dorzolamide when added to latanoprost.Subjects and methods: This study included 46 patients (46 eyes with primary open-angle glaucoma who had been treated with latanoprost. Dorzolamide (1% was added to latanoprost, and the intraocular pressure (IOP was monitored before and after 3, 6, and 12 months. The mean deviation shown by Humphrey perimetry was compared before and after twelve months of treatment. Adverse reactions were monitored over the 12-month study period.Results: The mean baseline IOP was 17.2 ± 3.0 mmHg while those after 3, 6 and 12 months of treatment were 14.9 ± 3.0 mmHg, 14.5 ± 3.2 mmHg, and 14.6 ± 2.6 mmHg respectively (P < 0.0001, 1-ß(power = 0.9999571. The absolute reduction of IOP and the percent reduction were similar after 3, 6, and 12 months of treatment. The mean deviation on Humphrey perimetry was similar before and after twelve months of treatment. Three patients discontinued dorzolamide therapy due to elevation of IOP and one patient discontinued it because of adverse reactions.Conclusion: Dorzolamide is safe and effective when used for twelve months as add-on therapy to latanoprost for open-angle glaucoma.Keywords: dorzolamide, primary open-angle glaucoma, latanoprost 

  2. Do supervised weekly exercise programs maintain functional exercise capacity and quality of life, twelve months after pulmonary rehabilitation in COPD?

    Directory of Open Access Journals (Sweden)

    Alison Jennifer A

    2007-05-01

    Full Text Available Abstract Background Pulmonary rehabilitation programs have been shown to increase functional exercise capacity and quality of life in COPD patients. However, following the completion of pulmonary rehabilitation the benefits begin to decline unless the program is of longer duration or ongoing maintenance exercise is followed. Therefore, the aim of this study is to determine if supervised, weekly, hospital-based exercise compared to home exercise will maintain the benefits gained from an eight-week pulmonary rehabilitation program in COPD subjects to twelve months. Methods Following completion of an eight-week pulmonary rehabilitation program, COPD subjects will be recruited and randomised (using concealed allocation in numbered envelopes into either the maintenance exercise group (supervised, weekly, hospital-based exercise or the control group (unsupervised home exercise and followed for twelve months. Measurements will be taken at baseline (post an eight-week pulmonary rehabilitation program, three, six and twelve months. The exercise measurements will include two six-minute walk tests, two incremental shuttle walk tests, and two endurance shuttle walk tests. Oxygen saturation, heart rate and dyspnoea will be monitored during all these tests. Quality of life will be measured using the St George's Respiratory Questionnaire and the Hospital Anxiety and Depression Scale. Participants will be excluded if they require supplemental oxygen or have neurological or musculoskeletal co-morbidities that will prevent them from exercising independently. Discussion Pulmonary rehabilitation plays an important part in the management of COPD and the results from this study will help determine if supervised, weekly, hospital-based exercise can successfully maintain functional exercise capacity and quality of life following an eight-week pulmonary rehabilitation program in COPD subjects in Australia.

  3. The myrmicine ant genus Metapone Forel (Hymenoptera: Formicidae): a global taxonomic review with descriptions of twelve new species.

    Science.gov (United States)

    Taylor, Robert W; Alpert, Gary D

    2016-04-26

    The 28 known species of Metapone are monographed and illustrated. Twelve are described as new: M. africana, Gabon; M. balinensis, Bali, Indonesia; M. enigmatica, northeast New Guinea; M. hoelldobleri, northeast Queensland, Australia; M. javana, Java, Indonesia; M. manni, Viti Levu, Fiji; M. mathinnae, Flinders Island, Tasmania, Australia; M. philwardi, northeast New Guinea; M. salomonis, Guadalcanal, Solomon Islands; M. tecklini, northeast Queensland; M. titan, New Ireland, Papua New Guinea; M. wallaceana, Lombok, Indonesia; spp.n. New synonymies include M. greeni Forel = M. johni Karavaiev (Sri Lanka) syn.n, and M. jacobsoni Crawley (Sumatra) = M. nicobarensis Tiwari & Jonathan (Great Nicobar Island) syn.n.

  4. The Effect o f Twelve - Week Recreation Act i v ities on the Anxiety Level of Female Pri soners

    Directory of Open Access Journals (Sweden)

    Zekiye B AŞARAN

    2015-07-01

    Full Text Available T h e a i m o f t h e s t u d y w a s to examine the effect of twelve - weeks recreation activities on the trait anxiety level of female prisoners in the prisons. The sampling of this study consists of 45 female prisoners who are in the Open Prison in Kandira, 22 of whom are in the experimental group and 23 of whom are in the control group. Different activities, such as music, dance, meditatio n, sportive activities, movies and videos, fun and entertainment activities and competitions, were performed one and half hours a day and two days a week. This lasted for twelve weeks. The data were collected by pre - tests and post - tests that were given bo th at the beginning and at the end of this program. Personal information form and Spielberger anxiety inventory were used as the data collecting tool. The reliability coefficient (Cronbach Alpha was calculated as ,873. The data were analysed with SPSS Win dows 18 programme. Descriptive statistics and Wilcoxon test were conducted. A si gnificant statistical correlation was determined between the prisoners’ pre - tests and post - tests scores in the experimental group (p <0.05. A s c o n c l u s i o n , a positive impact on trait anxiety levels of prisoners w a s f o u n d a f t e r 12 weeks o f recreational activities.

  5. Risk assessment of K basin twelve-inch drain valve failure from a postulated seismic initiating event

    Energy Technology Data Exchange (ETDEWEB)

    MORGAN, R.G.

    1999-04-06

    The Spent Nuclear Fuel (SNF) Project will transfer metallic SNF from the Hanford 105 K-East and 105 K-West Basins to safe interim storage in the Canister Storage Building in the 200 Area. The initial basis for design, fabrication, installation, and operation of the fuel removal systems was that the basin leak rates which could result from a postulated accident condition would not be excessive relative to reasonable recovery operations. However, an additional potential K Basin water leak path is through the K Basin drain valves. Three twelve-inch drain valves are located in the main basin bays along the north wall. The sumps containing the valves are filled with concrete which covers the drain valve body. Visual observations suggest that only the valve's bonnet and stem are exposed above the basin concrete floor. It was recognized, however, that damage of the drain valve bonnet or stem during a seismic initiating event could provide a potential K Basin water leak path. The objectives of this activity are to: (1) evaluate the risk of damaging the three twelve-inch drain valves located along the north wall of the main basin from a seismic initiating event, and (2) determine the associated potential leak rate from a damaged valve.

  6. Twelve new species and fifty-three new provincial distribution records of Aleocharinae rove beetles of Saskatchewan, Canada (Coleoptera, Staphylinidae).

    Science.gov (United States)

    Klimaszewski, Jan; Larson, David J; Labrecque, Myriam; Bourdon, Caroline

    2016-01-01

    One hundred twenty species of aleocharine beetles (Staphylinidae) are recognized in the province of Saskatchewan. Sixty-five new provincial records, including twelve new species and one new North American record, are presented. Oligota inflata (Mannerheim), a Palearctic species, is newly recorded for North America. The following twelve species are described as new to science: Acrotona pseudopygmaea Klimaszewski & Larson, sp. n., Agaricomorpha pulchra Klimaszewski & Larson, sp. n. (new genus record for Canadian fauna), Aleochara elisabethae Klimaszewski & Larson, sp. n., Atheta (Dimetrota) larsonae Klimaszewski & Larson, sp. n., Atheta (Microdota) pseudopittionii Klimaszewski & Larson, sp. n., Atheta (Microdota) spermathecorum Klimaszewski & Larson, sp. n., Atheta (sensu lato) richardsoni Klimaszewski & Larson, sp. n., Brachyusa saskatchewanae Klimaszewski & Larson, sp. n., Dochmonota langori Klimaszewski & Larson, sp. n., Dochmonota simulans Klimaszewski & Larson, sp. n., Dochmonota websteri Klimaszewski & Larson, sp. n., and Oxypoda domestica Klimaszewski & Larson, sp. n. Colour images of habitus and black and white images of the median lobe of the aedeagus, spermatheca, and tergite and sternite VIII are presented for all new species, Oligota inflata Mannerheim and Dochmonota rudiventris (Eppelsheim). A new synonymy is established: Tetralina filitarsus Casey, syn. n. = Tetralina helenae Casey, now placed in the genus Brachyusa Mulsant & Rey.

  7. Risk assessment of K basin twelve-inch drain valve failure from a postulated seismic initiating event

    Energy Technology Data Exchange (ETDEWEB)

    MORGAN, R.G.

    1999-04-06

    The Spent Nuclear Fuel (SNF) Project will transfer metallic SNF from the Hanford 105 K-East and 105 K-West Basins to safe interim storage in the Canister Storage Building in the 200 Area. The initial basis for design, fabrication, installation, and operation of the fuel removal systems was that the basin leak rates which could result from a postulated accident condition would not be excessive relative to reasonable recovery operations. However, an additional potential K Basin water leak path is through the K Basin drain valves. Three twelve-inch drain valves are located in the main basin bays along the north wall. The sumps containing the valves are filled with concrete which covers the drain valve body. Visual observations suggest that only the valve's bonnet and stem are exposed above the basin concrete floor. It was recognized, however, that damage of the drain valve bonnet or stem during a seismic initiating event could provide a potential K Basin water leak path. The objectives of this activity are to: (1) evaluate the risk of damaging the three twelve-inch drain valves located along the north wall of the main basin from a seismic initiating event, and (2) determine the associated potential leak rate from a damaged valve.

  8. Two essays on electricity markets: Entry into hydroelectric generation industry and the political cycle of regulated prices

    Science.gov (United States)

    Moita, Rodrigo Menon Simoes

    This dissertation is about the electricity industry and the problems that arise with the liberalization and de-regulation of the industry. Characteristics intrinsic to the electricity market create problems that can compromise an efficient functioning of this market. Each of the two chapters of this dissertation focus on a specific aspect of this industry. The first chapter analyzes entry in the hydroelectric generation industry. The operation of a generator upstream regularizes the river flow for generators located downstream on the same river, increasing the production capacity of the latter. This positive externality increases the attractiveness of the locations downstream whenever a generator decides to enter upstream. Therefore, the entry decision of a generator in a given location may affect all entry decisions in potential locations for plants located downstream. I first model the problem of generators located in cascade on the same river and show the positive effect of the externality. Second, I use a panel of data on investment decisions of hydro-generation firms to estimate an entry model that takes into account the effect of the externality generated by entry upriver. The results show a positive incentive to locate downstream from existing plants and from locations where entry is likely to occur. Location characteristics also play an important role on the entrants' decisions. The model provides estimates of the average expected market price across the different years covered by the sample and shows that it rose one year before the energy crisis of 2001, evidencing that the market anticipated the crisis. This result has important implications on the evaluation of the Brazilian market design. It shows that entry responded to a rise in expectations about excess demand in the future, contradicting the argument that the crisis was a consequence of mis-designed market institutions. The second chapter deals with the problem of the political cycle in regulated

  9. Evaluating the potential for catastrophic fault-rupture-related hazards affecting a key hydroelectric and irrigation region in central Asia

    Science.gov (United States)

    Rust, D.; Korjenkov, A.; Tibaldi, A.; Usmanova, M.

    2009-04-01

    The Toktogul hydroelectric and irrigation scheme is the largest in central Asia, with a reservoir containing almost 20 km3 of water behind a 230 m-high dam. Annually, the scheme generates 1200 MW of electricity that is distributed over Kyrgyzstan, Uzbekistan, Tajikistan, Kazakhstan and Russia. The scheme is vital for the economic, social and agricultural stability and development of the emerging central Asian republics it serves and, since it is no longer administered centrally as it was in Soviet times, is increasingly the focus of cross-border tensions involving competing needs for irrigation water and power supplies. Our work aims to identify and evaluate potential geo-environmental threats to this region for the benefit of stakeholders; with recommendations for measures to mitigate a range of threat scenarios, presented in a user-friendly GIS format. Most notably these scenarios involve the potential for very large magnitude earthquakes, with associated widespread slope instability, occurring on the little known Talas - Fergana fault. This structure, some 700 km long, bisects the Toktogul region within the actively (~20 mm a-1) contracting Tien Shan mountain range and exhibits geological characteristics similar to large strike-slip faults such as the San Andreas. Historical records are limited in this inaccessible mountainous region that, until Soviet times, was occupied by mainly nomadic peoples, but do not indicate recent fault rupture. This highlights the role of geological investigations in assembling a record of past catastrophic events to serve as a guide for what may be expected in the future, as well as the inherent difficulties in attempting geological forecasts to a precision that is useful on human timescales. Such forecasts in this region must also include the presence of some 23 uranium mining waste dumps within the mountain valleys, a legacy from Soviet times, as well as arsenic-rich waste dumps remaining from an earlier era of gold mining. Many

  10. A class III archaeological survey of twelve region wide fencing upgrade locations in Eagle, Grand, Gunnison, Jackson, Moffat, Pitkin, and Routt counties, Colorado

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Colorado Department of Transportation proposes to upgrade existing right-of-way fencing along roadways at twelve separate locations in northwestern Colorado. To...

  11. The regulatory incentives for the electric power decentralized generation in the Brazil (with emphasis on small hydroelectric power plants); Os incentivos regulatorios para a geracao descentralizada de energia eletrica no Brasil (com enfase em PCHs)

    Energy Technology Data Exchange (ETDEWEB)

    Nascimento, Jose Guilherme A. do; Santos, Afonso Henriques Moreira; Rocha, Gilma dos Passos [Agencia Nacional de Energia Eletrica (ANEEL), Brasilia, DF (Brazil)]. E-mail: guilherme@aneel.gov.br

    2000-07-01

    This chapter reports the present situation of the decentralized electric power generation in Brazil and the evolution of the regulatory structure in the electric sector, with emphasis on the small hydroelectric power plants, considering the advantages existent compared to the other electric power generation sources.

  12. Private sector financing of projects - implementation of the BAKUN hydroelectric project in Malaysia; Private Projektfinanzierung - Errichtung der Wasserkraftanlage Bakun in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Failer, E. [Lahmeyer International GmbH, Frankfurt am Main (Germany)

    1998-07-01

    The BAKUN Hydroelectric Power Project in Malaysia represents, alongside the Three Gorges Project in China, one of today's most closely observed hydropower projects. The Bakun Project features a generating capacity of 2 520 MW, a 205 m high concrete face rockfill dam and a 1 320 km long power transmission system from Sarawak (Borneo) to West Malaysia. Implementation costs are estimated at around DM 10 000 million. In December 1996 the concession to construct and operate the Bakun Project for a period of 30 years on a BOT (build-operate-transfer) basis was granted to the Bakun Hydro-Electric Corporation, a private project development company. A US-Dollar million contract was awarded one year prior to this concession, to construct the river diversion works in advance. Completion of the three concrete-lined diversion tunnels, each with an inner diameter of 12 m, is scheduled for the end of 1998. After a brief overview of the Bakun Project, the paper describes a typical structure of the parties involved and the legal framework for BOT project finance. The most important features of the concession agreement, the power purchase agreement (PPA) and the engineering, procurement and construction (EPC) contract are explained. Finally, the paper emphasizes that in future the water resources engineer will have to be more involved with topics such as fixed-price contracts, risk management, turnkey solutions and project finance. (orig.) [German] Mit einer geplanten installierten Leistung von 2 520 MW, einem 205 m hohen Steinschuettdamm mit Betonoberflaechendichtung, einem 1 320 km langen Energieuebertragungssystem von Sarawak (Borneo) nach Westmalaysia und mit Projektkosten von ca. 10 Mrd. DM stellt das BAKUN-Wasserprojekt in Malaysia, neben dem Dreischluchtenprojekt in China, eines der meist beachteten Wasserkraftprojekte der Gegenwart dar. Im Dezember 1996 erhielt die private Projektentwicklungsgesellschaft 'Bakun Hydro-Electric Corporation' die Konzession, das

  13. Assessment of Diversity, Distribution, Conservation Status and Preparation of Management Plan for Medicinal Plants in the Catchment Area of Parbati Hydroelectric Project Stage -Ⅲ in Northwestern Himalaya

    Institute of Scientific and Technical Information of China (English)

    S.S. Samant; Jitendra S. Butola; Aman Sharma

    2007-01-01

    The developmental activities, particularly the construction of hydroelectric projects are causing a great loss of biodiversity in the Indian Himalayan Region. The Himachal Pradesh, a part of IHR is well known for the development of hydroelectric projects.The Parbati H.E. Project is amongst the major projects of the State. The different stages of the project are all causing loss of biodiversity of the area.Stage Ⅲ of the Parbati H.E. Project is a run of the river scheme on the Sainj River downstream of Power House of Parbati H.E. Project Stage Ⅱ. The project shall utilize regulated discharge of Parbati H.E.Project Stage Ⅱ and inflow of River Sainj for power generation, and has been contemplated as a peaking station operating in tandem with Stage Ⅱ. The present study has been undertaken to see the impact of hydroelectric project on the biodiversity, particularly on medicinal plants. A total of 104 species of medicinal plants, belonging to different life forms, i.e.,trees (23 spp.), shrubs (22 spp.), herbs (57 spp.) and ferns (2 spp.) were recorded. The species have been analyzed and studied for their distribution,classification, altitudinal zones, part (s) used,indigenous uses, nativity, endemism and rarity.Different parts of these species, such as whole plants,roots (including rhizomes and tubers), leaves, flowers,fruits, seeds, stems, barks, spikes, nuts and insect galls are used by the inhabitants for curing various diseases and ailments. 30 species are native to the Himalayan region, 9 species native to the Himalayan region and adjacent countries also and 65 species are non-natives. 9 species are near endemics. Considering the whole Himalaya as a biogeographic unit (sensu lato),the near endemics are endemic to the Himalaya.Among these species, Zanthoxylum armatum is categorized as Endangered and Valeriana wallichii as Vulnerable. Hedychium spicatum, Rhus javanica,Berberis lycium, Thalictrum foliolossum, Salvia lanata, Rubia cordifolia and Bergenia

  14. The Extension of The Twelve-Point Sphere Theorem for a Tetrahedron%四面体的十二点二次曲面

    Institute of Scientific and Technical Information of China (English)

    王奇志; 王东生

    2012-01-01

    垂心四面体中四条高的垂足,四个面的重心及从各顶点与四面体的垂心连线的三等分点,共十二个点共球.试图把垂心改为四面体内的任意点,相应地把四条高线改换为过该点与每个顶点连线的共点直线组时,则将把垂心四面体的十二点球有趣地推广为四面体的十二点二次曲面.%The four feet of four altitudes for an orthocenter tetrahedron, the centers of gravity of the four faces, the trisection of the line segments from the orthocenter to four summits, total twelve points lie on same sphere, which is known as twelve-point sphere. If the orthocenter can be changed into any point within a tetrahedron in this paper, and corresponding the four perpendiculars also can be changed into the four lines segment passing through the given point to the summits of the tetrahedron, the twelve-point sphere can be changed into twelve-point quadric surface. Twelve point sphere of an orthocenter tetrahedron can be generalized to the twelve-point quadratic surface of a tetrahedron.

  15. Floristic and phytosociology in dense “terra firme” rainforest in the Belo Monte Hydroelectric Plant influence area, Pará, Brazil

    Directory of Open Access Journals (Sweden)

    DAN. Lemos

    Full Text Available Abstract The objective of the present study was to characterise the floristic and phytosociological composition on a stretch of dense “Terra Firme” rainforest located in the Belo Monte hydroelectric plant area of influence, located in the state of Pará, Brazil. All trees with DAP >10 cm situated in 75 permanent plots of 1 ha were inventoried. 27,126 individuals trees (361 ind.ha-1, distributed in 59 botanical families, comprising 481 species were observed. The families with the largest number of species were Fabaceae (94, Araceae (65 and Arecaceae (43, comprising 43.7% of total species. The species Alexa grandiflora (4.41, Cenostigma tocantinum (2.50 and Bertholletia excelsa (2.28 showed the highest importance values (IV. The ten species with greater IV are concentrated (22%. The forest community has high species richness and can be classified as diverse age trees, heterogeneous and of medium conservation condition.

  16. Ecological improvements to hydroelectric power plants under EEG. Guidance to environmental verifiers and water rights authorities; Oekologische Verbesserungsmassnahmen an Wasserkraftanlagen gemaess EEG. Leitfaden fuer Umweltgutachter und Wasserrechtsbehoerden

    Energy Technology Data Exchange (ETDEWEB)

    Meyr, Christoph; Pfeifer, Hansjoerg [EVIT GmbH Ingenieurbuero Unternehmensberatung, Muenchen (Germany); Schnell, Johannes; Hanfland, Sebastian [Landesfischereiverband Bayern e.V., Muenchen (Germany)

    2011-11-15

    The use of hydropower as a renewable form of energy is experiencing a renaissance due to the energy transition in Bavaria. The fishery evaluate not uncritically this development, because hydroelectric plants generally normally represent a considerable intervention in water and therefore in the habitat of the fish. In this case it should be noted that just often not even the minimum requirements of ecology are fulfilled at existing plants according to the Federal Water Act. [German] Die Nutzung der Wasserkraft als regenerative Energieform erlebt aufgrund der Energiewende in Bayern derzeit eine Art Renaissance. Die Fischerei bewertet diese Entwicklung nicht unkritisch, stellen Wasserkraftanlagen in der Regel doch einen erheblichen Eingriff in Gewaesser und somit den Lebensraum der Fische dar. Dabei ist festzustellen, dass gerade an bestehenden Anlagen haeufig nicht einmal die Mindestanforderungen der Oekologie erfuellt werden, wie sie das Wasserhaushaltsgesetz vorschreibt.

  17. Electric generator overhaul of the Ing. Carlos Ramirez Ulloa hydroelectric. Central project conclusions; Rehabilitacion de los generadores de la central hidroelectrica Ing. Carlos Ramirez Ulloa. Conclusiones del proyecto

    Energy Technology Data Exchange (ETDEWEB)

    Campuzano Martinez, Ignacio Roberto; Gonzalez Vazquez, Alejandro Esteban; Robles Pimentel, Edgar Guillermo; Esparza Saucedo, Marcos; Garcia Martinez, Javier; Sanchez Flores, Ernesto; Martinez Romero, Jose Luis [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    The Hydroelectric Ing. Carlos Ramirez Ulloa Power Central has three 200 MW electric generators. The Central initiated its commercial operation in 1985. The electric generators had design problems that were properly corrected in an overhaul program that was initiated in 1996, with Unit 2 electric generator and completed in 1998 with Unit 1 electric generator. This paper presents the relevant aspects of the experience accumulated in the project. [Espanol] La central hidroelectrica Ing. Carlos Ramirez Ulloa cuenta con tres generadores de 200 MW cada uno. La central inicio su operacion comercial en 1985. Los generadores tenian problemas de diseno que fueron debidamente corregidos en un programa de rehabilitacion que inicio en 1996, con el generador de la unidad 2, y culmino en 1998 con el generador de la unidad 1. En este articulo se presentan los aspectos relevantes de la experiencia acumulada en el proyecto.

  18. Methodology to identify the location of shoals of fish downstream from hydroelectric power plant; Metodologia para identificar a locacao de cardumes de peixes a jusante de UHE

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, C.B.; Viana, E.M.F.; Faria, M.T.C. de [Universidade Federal de Minas Gerais, Belo Horizonte, MG (Brazil). Centro de Pesquisas Hidraulicas e Recursos Hidricos], Emails: martinez@cce.ufmg.br, ednamariafaria@ufmg.br, mtcdf@uol.com.br

    2009-07-01

    The location identification of fish shoals at the downstream of an hydroelectric power plants is a task of importance especially when one takes into account the need to identify possible locations for the deployment of fish transportation mechanism. This paper presents a methodology based on the use of reduced models, which will be operated during the biological testing, under flow and conditions similar to the field where will be included shoals of fish. These groups will be observed during a period of time under varying conditions of discharge of hydraulic turbines. At the end of this observation it can be identified preferential location areas of fish shoals that will be evaluated later in order to install transposition systems in the place.

  19. Assessment Planning and Evaluation of Renewable Energy Resources: an Interactive Computer Assisted Procedure. [hydroelectricity, biomass, and windpower in the Pittsfield metropolitan region, Massachusetts

    Science.gov (United States)

    Aston, T. W.; Fabos, J. G.; Macdougall, E. B.

    1982-01-01

    Adaptation and derivation were used to develop a procedure for assessing the availability of renewable energy resources on the landscape while simultaneously accounting for the economic, legal, social, and environmental issues required. Done in a step-by-step fashion, the procedure can be used interactively at the computer terminals. Its application in determining the hydroelectricity, biomass, and windpower in a 40,000 acre study area of Western Massachusetts shows that: (1) three existing dam sites are physically capable of being retrofitted for hydropower; (2) each of three general areas has a mean annual windspeed exceeding 14 mph and is conductive to windpower; and (3) 20% of the total land area consists of prime agricultural biomass while 30% of the area is prime forest biomass land.

  20. Construction and modernization of small hydroelectric installations with funding by programmes of the EU. Abstract; Neubau und Modernisierung von Kleinwasserkraftanlagen durch Foerderprogramme der E.U.. Kurzfassung

    Energy Technology Data Exchange (ETDEWEB)

    Hauck, E. [Ingenieurgesellschaft fuer Wasserbau und Bautechnik mbH, Rheinstetten (Germany)

    1997-12-31

    The report gives a brief introduction into the EU grant programmes since 1984 and explains the philosophy behind them. The current situation regarding grant opportunities for the construction and modernization of small hydroelectric installations is outlined. Hints are given with a view to grant applications. A selection of small hydro power stations supported by grants (since 1984) are described with their economic and technical features. (orig.) [Deutsch] In diesem Beitrag wird eine kurze Einfuehrung in die EU-Foerderprogramme seit 1984 und Erlaeuterungen zu der Programmphilosophie gegeben. Die derzeitige Situation bezueglich der Foerderung von Kleinwasserkraftanlagen fuer Neubauten und Modernisierungsmassnahmen wird dargestellt. Es werden Hinweise zur Stellung eines Foerderantrags beschrieben. Abschliessend erfolgt die Vorstellung einer Auswahl von gefoerderten Kleinwasserkraftanlagen (seit 1984) mit den wirtschaftlichen und technischen Besonderheiten. (orig.)

  1. Adıgüzel Hydroelectric Power Plant’s Modelling and LoadFrequency Control by Fuzzy Logic Controller

    Directory of Open Access Journals (Sweden)

    Yüksel Oğuz

    2016-08-01

    Full Text Available In this study, to realize the load-frequency control according to different loading statuses, modelling of dynamic behaviour of the Adıgüzel Hydroelectric Power Plant (HEPP was made by using the Matlab/Simulink program.By establishing the dynamic model of 36MVA synchronous generator and other components in the system in a manner reflecting its behaviour in the real system, performance of classical controller and self-adjusting fuzzy logic controller in electro-hydraulic governor circuit was examined according to different load statuses. During the simulation works carried out when both control systems closely watched in the fuzzy logic control system according to different loads the frequency of load and the number of frequency have been observed to be stable in short period of time and allowed tolerance limits.

  2. Sanitary risks related to the installation of hydroelectric turbines on drinking water networks; Hydroelectricite: les risques sanitaires pour l'adduction d'eau

    Energy Technology Data Exchange (ETDEWEB)

    Novelli, A. [Agence Francaise de Securite Sanitaire des Aliments - AFSSA, DERNS - Unite d' Evaluation des Risques Lies a l' Eau - UERE, 94 - Maisons Alfort (France); Montiel, A.; Cabillic, P.J.; Fourrier, P.; Levi, Y.; Potelon, J.L.; Welte, B. [Comite d' Experts Specialise Eaux de l' AFSSA, 94 - Maisons Alfort (France); Fourrier, P. [Autorite de Surete Nucleaire 75 - Paris (France); Levi, Y. [Paris-11 Univ., Faculte de Pharmacie, Lab. Sante Publique Environnement, 91 - Orsay (France); Potelon, J.L. [Ecole des Hautes Etudes de Sante Publique - EHESP, 35 - Rennes (France); Welte, B. [Eau de Paris, 75 (France)

    2010-11-15

    With the notion of sustainable development gaining ground, practices aimed at saving water and energy are more and more frequent, particularly the installation of hydroelectric turbine on drinking water networks. It is essential in this case that the water quality should not be deteriorated, and the water supply for consumption and fire protection has to be prioritized over energy production. Thus, a sanitary risk assessment must be done and actions to control the described critical points have to be taken. The installation of a turbine is an additional risk whereas it is not necessary for drinking water production and distribution. As a consequence, a quality management system including the turbine and additional quality water monitoring should be carried out. (authors)

  3. Case study analysis of the legal and institutional obstacles and incentives to the development of the hydroelectric power at the Maxwell locks and dam, Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal, institutional and financial obstacles, and incentives to the development of hydroelectric power at the Maxwell locks and dam on the Monongahela River are analyzed. The study is one of five studies prepared by the Energy Law Institute pursuant to a contract with the National Conference of State Legislators. Each of the five studies views dam development by a different category of developer. These categories include a municipality, a public utility, a state, a private developer, and a cooperative. The Maxwell case study concerns potential development by Allegheny Electric Cooperative. Thus, the analysis of obstacles and incentives is focused on those factors which have particular impact on a cooperative. Subjects covered include a description of the site; developer description; the feasibility study; the economic feasibility; financing; Federal licensing by FERC; state licensing; local interest and requirements; the effect of locks and dam operation by the Army Corp of Engineers; and power marketing.

  4. Assessment Planning and Evaluation of Renewable Energy Resources: an Interactive Computer Assisted Procedure. [hydroelectricity, biomass, and windpower in the Pittsfield metropolitan region, Massachusetts

    Science.gov (United States)

    Aston, T. W.; Fabos, J. G.; Macdougall, E. B.

    1982-01-01

    Adaptation and derivation were used to develop a procedure for assessing the availability of renewable energy resources on the landscape while simultaneously accounting for the economic, legal, social, and environmental issues required. Done in a step-by-step fashion, the procedure can be used interactively at the computer terminals. Its application in determining the hydroelectricity, biomass, and windpower in a 40,000 acre study area of Western Massachusetts shows that: (1) three existing dam sites are physically capable of being retrofitted for hydropower; (2) each of three general areas has a mean annual windspeed exceeding 14 mph and is conductive to windpower; and (3) 20% of the total land area consists of prime agricultural biomass while 30% of the area is prime forest biomass land.

  5. Urban green areas as the starting point for planning hydroelectric and urban developments: The case of the Sava River in the City of Ljubljana

    Directory of Open Access Journals (Sweden)

    Aleš Mlakar

    2008-01-01

    Full Text Available The article deals with the landscape and urbanistic layout of the Sava River space and North part of the Bežigrad stretch of Ljubljana. Focus is on methodological and content starting points for the layout preparation and development of urban green areas of the wider Sava River space, which as a connecting link and simultaneously independent spatial and functional entity represents the starting point for planning hydro-energetic and urban arrangements. The necessity of recognising and resolving real spatial planning issues, formulation of clear goals and concepts, confrontation of different spatial systems and interests, as well as the sensibility of devising alternative development scenarios are emphasised. One of the most important starting points of the proposed layout is comprehensive design of public open spaces and green areas. The urbanistic solution relies on a programmatically strong, distinct and structured Dunajska Street, which should transform into the public space of a modern urban artery, with a clear ending that simultaneously gradually adapts to the morphology akin to the surroundings and Sava River space. Because of its natural characteristics, preserved cultural landscape and good accessibility, this area has great potential for development of leisure activities. The proposed solution stems from the fact that the chain of hydro-electric plants shouldn't be seen as buildings with negative environmental effects, but also as development opportunities – the actual execution of a recreation area along the Sava River and a method for rehabilitating the degraded spaces. Comprehensive solutions along the river have been proposed as parts of the hydro-electric developments, with special attention focusing on active design of various riverbank types.

  6. Perceived ill-health and health seeking behavior in two communities in the nam theun 2 hydroelectric project area in Lao People's Democratic Republic

    Institute of Scientific and Technical Information of China (English)

    Sayasone S; Erlanger TE; Kaul S; Sananikhom P; Tanner M; Utzinger J; Odermatt P

    2009-01-01

    Objective:To compare perceived ill-health and health seeking behavior between two communities affected by the large Nam Theun 2 hydroelectric project in central Lao People's Democratic Republic (PDR).Methods:Two different affected areas:Nakai plateaubeing remote,sparcely populated and mountainous,and Xe Bang Fai lowland plains,more densely populated and comparatively affluent were included.Data were obtained from two cross-sectional household-based health and socio-economic surveys.Results:We found pronounced differ-ences in the frequency of self-reported fever,cough,headache and myalgia according to location.On the Na-kai plateau,45.1 % of the individuals with ill-health report (recall period:2 weeks)went to a local health volunteer compared to only 7.2 % in the Xe Bang Fai area (P <0.001).In Nakai,there were disproportion-ately more illiterates seeking help from local health volunteers when compared to those who attended at least primary schooling (49.2 % versus 17.5 %,P <0.01).Self-medication with antimalarials was more common in Xe Bang Fai than on Nakai (32.3 % versus 7.0 %,P <0.001).The mean amount of money spent per health consultation was US $1.7 in Nakai and US $7.2 in Xe Bang Fai.Conclusion:The observed differ-ences in self-reported ill-health and health seeking behavior among these two Lao communities need to be con-sidered when implementing setting-specific mitigation measures as part of the public health action plan of the Nam Theun 2 hydroelectric project.

  7. Twelve reasons to refuse the nuclear in the MDP; Douze raisons pour refuser le nucleaire dans le MDP

    Energy Technology Data Exchange (ETDEWEB)

    Bonduelle, A

    2000-07-01

    The author presents twelve reasons which show that the nuclear energy has not a place in the MDP Mechanism of Clean Development: a main loophole for the developed countries, the doubtful ''additionality'' of the nuclear, the treaty ratification is more difficult with the nuclear, the domestic energy conservation is more efficient in Europe than the nuclear development, the nuclear white elephants facing the South debts, the technology transfers are doubtful, the developing countries and the sustainable development policies are evicted from the MDP, some options are more powerful in the South, the reactors and transport networks size are unsuited, the absence of democratic control, the nuclear proliferation, the nuclear safety and the wastes. (A.L.B.)

  8. Twelve positions in a β-lactamase that can expand its substrate spectrum with a single amino acid substitution.

    Directory of Open Access Journals (Sweden)

    Hyojeong Yi

    Full Text Available The continuous evolution of β-lactamases resulting in bacterial resistance to β-lactam antibiotics is a major concern in public health, and yet the underlying molecular basis or the pattern of such evolution is largely unknown. We investigated the mechanics of the substrate fspectrum expansion of the class A β-lactamase using PenA of Burkholderia thailandensis as a model. By analyzing 516 mutated enzymes that acquired the ceftazidime-hydrolyzing activity, we found twelve positions with single amino acid substitutions (altogether twenty-nine different substitutions, co-localized at the active-site pocket area. The ceftazidime MIC (minimum inhibitory concentration levels and the relative frequency in the occurrence of substitutions did not correlate well with each other, and the latter appeared be largely influenced by the intrinsic mutational biases present in bacteria. Simulation studies suggested that all substitutions caused a congruent effect, expanding the space in a conserved structure called the omega loop, which in turn increased flexibility at the active site. A second phase of selection, in which the mutants were placed under increased antibiotic pressure, did not result in a second mutation in the coding region, but a mutation that increased gene expression arose in the promoter. This result suggests that the twelve amino acid positions and their specific substitutions in PenA may represent a comprehensive repertoire of the enzyme's adaptability to a new substrate. These mapped substitutions represent a comprehensive set of general mechanical paths to substrate spectrum expansion in class A β-lactamases that all share a functional evolutionary mechanism using common conserved residues.

  9. Changes in lipids over twelve months after initiating protease inhibitor therapy among persons treated for HIV/AIDS

    Directory of Open Access Journals (Sweden)

    Hogg Robert S

    2005-02-01

    Full Text Available Abstract Background Protease inhibitors are known to alter the lipid profiles in subjects treated for HIV/AIDS. However, the magnitude of this effect on plasma lipoproteins and lipids has not been adequately quantified. Objective To estimate the changes in plasma lipoproteins and triglycerides occurring within 12 months of initiating PI-based antiretroviral therapy among HIV/AIDS afflicted subjects. Methods We included all antiretroviral naïve HIV-infected persons treated at St-Paul's Hospital, British Columbia, Canada, who initiated therapy with protease inhibitor antiretroviral (ARV drugs between August 1996 and January 2002 and who had at least one plasma lipid measurement. Longitudinal associations between medication use and plasma lipids were estimated using mixed effects models that accounted for repeated measures on the same subjects and were adjusted for age, sex, time dependent CD4+ T-cell count, and time dependent cumulative use of non-nucleoside reverse transcriptase inhibitors and adherence. The cumulative number of prescriptions filled for PIs was considered time dependent. We estimated the changes in the 12 months following any initiation of a PI based regimen. Results A total of 679 eligible subjects were dispensed nucleoside analogues and PI at the initiation of therapy. Over a median 47 months of follow-up (interquartile range (IQR: 29–62, subjects had a median of 3 (IQR: 1–6 blood lipid measurements. Twelve months after treatment initiation of PI use, there was an estimated 20% (95% confidence interval: 17% – 24% increase in total cholesterol and 22% (12% – 33% increase in triglycerides. Conclusions Twelve months after treatment initiation with PIs, statistically significant increases in total cholesterol and triglycerides levels were observed in HIV-infected patients under conditions of standard treatment. Our results contribute to the growing body of evidence implicating PIs in the development of blood lipid

  10. 5S rDNA characterization in twelve Sciaenidae fish species (Teleostei, Perciformes: depicting gene diversity and molecular markers

    Directory of Open Access Journals (Sweden)

    Fernanda A. Alves-Costa

    2008-01-01

    Full Text Available In order to extend the genetic data on the Sciaenidae fish family, the present study had the purpose to characterize PCR-generated 5S rDNA repeats of twelve species of this group through PAGE (Polyacrylamide Gel Electrophoresis analysis. The results showed the occurrence of at least two different 5S rDNA size classes in all the species. Moreover, 5S rDNA repeats of one of the studied species - Isopisthus parvipinnis - were cloned and subjected to nucleotide sequencing and Southern blot membrane hybridization analyses, which permitted to confirm the existence of two major 5S rDNA classes. Phylogenetic analysis based on the nucleotide sequences of different 5S rDNA repeats of I. parvipinnis lead to their separation into two major clusters. These results may reflect the high dynamism that rules the evolution rate of 5S rDNA repeats. The obtained data suggest that 5S rDNA can be useful in genetic analyses to identify species-specific markers and determine relationships among species of the Sciaenidae group.

  11. Uptake of radionuclide thorium by twelve native plants grown in uranium mill tailings soils from south part of China

    Energy Technology Data Exchange (ETDEWEB)

    Yan, Xun, E-mail: m13836295186@163.com

    2016-08-01

    Highlights: • Screen dominant plants grown in uranium mill tailings soils. • Quantify the content of {sup 232}Th of soil samples from uranium mill tailings. • Quantify the transfer factor, bioconcentration factor and phytoremediation factor. • Screen out the plant species capable of remediating radionuclide contaminated soils. • Guide the reuse of study area in future. - Abstract: The concentrations of thorium ({sup 232}Th) in soil from a uranium mill tailings repository in South China were analyzed. The results showed that all the soil samples were acidic and the concentrations of {sup 232}Th in all the soil samples were more than the natural radionuclide content in soil of China. Through the field investigation, twelve kinds of dominant plants were discovered. The total quantity of {sup 232}Th in the whole plant is highest in rice flat sedge. We also found that Miscanthus floridulus has the greatest transfer factor (TF) for {sup 232}Th, rice flat sedge has the greatest bioconcentration factor (BF) for {sup 232}Th. At the mean time, M. floridulus has the greatest phytoremediation factor (PF) for {sup 232}Th. On the basis of the above conclusions and the definition for hyperaccumulator, rice flat sedge and M. floridulus could be the candidates of phytoremediation for radionuclide {sup 232}Th in the soil.

  12. Videofluoroscopy of the oral phase of swallowing in eight to twelve years old children with dental malocclusion.

    Science.gov (United States)

    Junqueira, Patricia; Costa, Milton Melciades

    2013-11-01

    The objective of this study was to describe the oral phase of swallowing in individuals with dental malocclusion and to generate data that would contribute to the rehabilitation of those patients. The study was based on the evaluation of the swallowing system through videofluoroscopy on thirty-four children of both genders, aged eight to twelve years old who present with Angle Class II and III dental malocclusions. Thirteen children of similar age and gender presenting normal dental occlusion formed the control group. The results indicated that the oral phase of swallowing is different between individuals with normal occlusion and malocclusion. Dental occlusion types Angle Class II and III did not present a swallowing pattern, independently of the amount of liquid ingested. The swallowing appeared effective in the oral phase of individuals with dental malocclusion, even though adaptations were identified. The outcome, in the absence of a single pattern and the efficiency of the adapted swallowing demonstrates, first a need for additional research investigating orofacial myofunctional treatment for patients with malocclusion and second how such analyses should focus on contributing positively to the rehabilitation of these patients.

  13. Advanced LIGO Two-Stage Twelve-Axis Vibration Isolation and Positioning Platform. Part 2: Experimental Investigation and Tests Results

    CERN Document Server

    Matichard, Fabrice; Mason, Kenneth; Mittleman, Richard; Abbott, Benjamin; Abbott, Samuel; Allwine, Eric; Barnum, Samuel; Birch, Jeremy; Biscans, Sebastien; Clark, Daniel; Coyne, Dennis; DeBra, Dan; DeRosa, Ryan; Foley, Stephany; Fritschel, Peter; Giaime, Joseph A; Gray, Corey; Grabeel, Gregory; Hanson, Joe; Hillard, Michael; Kissel, Jeffrey; Kucharczyk, Christopher; Roux, Adrien Le; Lhuillier, Vincent; Macinnis, Myron; OReilly, Brian; Ottaway, David; Paris, Hugo; Puma, Michael; Radkins, Hugh; Ramet, Celine; Robinson, Mitchell; Ruet, Laurent; Sareen, Pradeep; Shoemaker, Daivid; Stein, Andy; Thomas, Jeremy; Vargas, Michael; Warner, Jimmy

    2014-01-01

    This paper presents the results of the past seven years of experimental investigation and testing done on the two-stage twelve-axis vibration isolation platform for Advanced LIGO gravity waves observatories. This five-ton two-and-half-meter wide system supports more than a 1000 kg of very sensitive equipment. It provides positioning capability and seismic isolation in all directions of translation and rotation. To meet the very stringent requirements of Advanced LIGO, the system must provide more than three orders of magnitude of isolation over a very large bandwidth. It must bring the motion below 10^(-11) m/(Hz)^0.5 at 1 Hz and 10^(-12) m/(Hz)^0.5 at 10 Hz. A prototype of this system has been built in 2006. It has been extensively tested and analyzed during the following two years. This paper shows how the experimental results obtained with the prototype were used to engineer the final design. It highlights how the engineering solutions implemented not only improved the isolation performance but also greatl...

  14. Twelve-month safety and efficacy of inhaled fluticasone propionate in children aged 1 to 3 years with recurrent wheezing

    DEFF Research Database (Denmark)

    Bisgaard, Hans; Allen, David; Milanowski, Janusz;

    2004-01-01

    : There was no significant difference in mean adjusted growth rates between the 2 groups: 84.0 mm/year in the FP group versus 86.4 mm/year in the SCG group (difference FP-SCG: -2.4 mm/year; 95% confidence interval: -6.6 to 1.8). Growth comparisons were independent of age, gender, previous use of steroid, or whether measured......, exacerbations, and requirements for oral steroid treatment and more symptom-free days and days without use of rescue treatment. CONCLUSIONS: Twelve months of treatment with inhaled FP (100 microg twice daily) in preschool children aged 1 to 3 years with recurrent wheeze has no effect on growth and no other......OBJECTIVE: Our aim was to compare the 12-month safety and efficacy of fluticasone propionate (FP) and sodium cromoglycate (SCG) in children aged 1 to 3 years with mild to moderate recurrent wheeze. METHODS: The study was a randomized, parallel-group, open-label multicenter study of 625 children...

  15. A First Assessment of Mycobacterium tuberculosis Genetic Diversity and Drug-Resistance Patterns in Twelve Caribbean Territories

    Directory of Open Access Journals (Sweden)

    Julie Millet

    2014-01-01

    Full Text Available With the exception of some French-speaking islands, data on tuberculosis (TB in the Caribbean are scarce. In this study, we report a first assessment of genetic diversity of a convenience sample of Mycobacterium tuberculosis strains received from twelve Caribbean territories by spoligotyping and describe their drug-resistance patterns. Of the 480 isolates, 40 (8.3% isolates showed resistance to at least one anti-TB drug. The proportion of drug-resistant strains was significantly higher in The Bahamas (21.4%; P=0.02, and Guyana (27.5%; P<0.0001, while it was significantly lower in Jamaica (2.4%; P=0.03 than in other countries of the present study. Regarding genetic diversity, 104 distinct spoligotype patterns were observed: 49 corresponded to clustered strains (2 to 93 strains per cluster, while 55 remained unclustered among which 16 patterns were not reported previously. Combining the study results with regional data retrieved from the international SITVIT2 database underlined a connection between frequency of certain M. tuberculosis phylogenetic lineages and the language spoken, suggesting historical (colonial and ongoing links (trade, tourism, and migratory flows with European countries with which they shared a common past.

  16. Measuring performance in off-patent drug markets: a methodological framework and empirical evidence from twelve EU Member States.

    Science.gov (United States)

    Kanavos, Panos

    2014-11-01

    This paper develops a methodological framework to help evaluate the performance of generic pharmaceutical policies post-patent expiry or after loss of exclusivity in non-tendering settings, comprising five indicators (generic availability, time delay to and speed of generic entry, number of generic competitors, price developments, and generic volume share evolution) and proposes a series of metrics to evaluate performance. The paper subsequently tests this framework across twelve EU Member States (MS) by using IMS data on 101 patent expired molecules over the 1998-2010 period. Results indicate that significant variation exists in generic market entry, price competition and generic penetration across the study countries. Size of a geographical market is not a predictor of generic market entry intensity or price decline. Regardless of geographic or product market size, many off patent molecules lack generic competitors two years after loss of exclusivity. The ranges in each of the five proposed indicators suggest, first, that there are numerous factors--including institutional ones--contributing to the success of generic entry, price decline and market penetration and, second, MS should seek a combination of supply and demand-side policies in order to maximise cost-savings from generics. Overall, there seems to be considerable potential for faster generic entry, uptake and greater generic competition, particularly for molecules at the lower end of the market.

  17. Chemical Abundances in Twelve Red Giants of the Large Magellanic Cloud from High-Resolution Infrared Spectroscopy

    CERN Document Server

    Smith, V V; Cunha, K; Plez, B; Lambert, D L; Pilachowski, C A; Barbuy, B; Melendez, J; Balachandran, S C; Bessell, M S; Geisler, D; Hesser, J E; Winge, C

    2002-01-01

    High-resolution infrared spectra (R=50,000) have been obtained for twelve red-giant members of the LMC with the Gemini South 8.3-meter telescope plus Phoenix spectrometer. Quantitative chemical abundances of carbon-12, carbon-13, nitrogen-14, and oxygen-16 were derived from molecular lines of CO, CN, and OH, while sodium, scandium, titanium, and iron abundances were derived from neutral atomic lines. The LMC giants have masses from about 1 to 4 solar masses and span a metallicity range from [Fe/H]= -1.1 to -0.3. The program red giants all show evidence of first dredge-up mixing, with low 12C/13C ratios, and low 12C correlated with high 14N abundances. Comparisons of the oxygen-to-iron ratios in the LMC and the Galaxy indicate that the trend of [O/Fe] versus [Fe/H] in the LMC falls about 0.2 dex below the Galactic trend. Such an offset can be modeled as due to an overall lower rate of supernovae per unit mass in the LMC relative to the Galaxy, as well as a slightly lower ratio of supernovae of type II to super...

  18. Phytoplankton of the portion of the Paranapanema River to be dammed for construction of the Rosana Hydroelectric Plant, Sao Paulo State, Southern Brazil; Fitoplancton do trecho a represar do Rio Paranapanema (Usina Hidreletrica de Rosana), Estado de Sao Paulo, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Bicudo, Carlos E. de M.; Bicudo, Denise de C.; Castro, Ana Alice J. de; Picelli-Vicentim, M. Marcina [Instituto de Botanica, Sao Paulo, SP (Brazil). Secao de Ficologia

    1992-12-31

    The phytoplankton community of the 120 Km long portion of the Paranapanema River located between the Salto Grande Hydroelectric Plant reservoir and the river mouth at the Parana River is surveyed. This part of the river will be dammed for construction of the Rosana hydroelectric System in the State of Sao Paulo, southern Brazil. An inventory was completed for 4 collecting stations, and based on the study of 48 samples gathered bimonthly during the period from November 1985 to September 1986. Each collection is represented by a net concentrated and a raw total phytoplankton sample. Except for the Bacillariophyceae, study of which is still in progress, the other classes present were the following in order of their local representation: Chlorophyceae with 23 taxa, Zygnemaphyceae (= Cyanophyceae) with 9, Tribophyceace (= Xanthophyceae) with 2 each one, and Oedogoniophyceae, Euglenophyceae and Chrysophyceae with a single taxon each, to a total of 55 taxa identified. (author) 27 refs., 6 figs.

  19. The Rio Lajas hydroelectric project in Costa Rica; Hydro-Quebec International gained from its Quebec expertise; La centrale Rio Lajas, au Costa Rica; Hydro-Quebec International a mis a profit l`expertise quebecoise

    Energy Technology Data Exchange (ETDEWEB)

    Cordeau, P.

    1997-08-01

    The participation of Hydro-Quebec International in the construction and development of the Rio Lajas hydroelectric project in Costa Rica was described. The 10 MW Rio Lajas hydroelectric station in Costa Rica is expected to go into operation in September of 1998. The station is owned by the HRL consortium, which is composed of Hydro-Quebec International and Corporacion Superior. Construction of the station was contracted out to SEH Constructora SA, a company composed of the Costarican contractor Saret and two companies from Quebec; Entreprises Bon Conseil and Hydro-Mecanique. The station comprises two horizontal-axis Francis turbines. Turbines and alternators were respectively supplied by Bouvier and GEC Alsthom, two French manufacturers. Considerable attention was given to the control of the Rio Lajas river, whose discharge can vary by as much as 100 times in the steep volcanic terrains. Approximately 15 Hydro-Quebec employees were delegated to Costa Rica to oversee various stages of the project.

  20. Operation of the ELETRONORTE hydrothermal systems: Amazonas, Rondonia and Amapa States and Tucurui Hydroelectric Power Plant, focusing the El Nino phenomenon; Operacao dos sistemas hidrotermicos da ELETRONORTE: Amazonas, Rondonia, Amapa e Usina Hidroeletrica de Tucurui, enfocando o fenomeno El Nino

    Energy Technology Data Exchange (ETDEWEB)

    Costalonga, Isabela dos Reis; Ferreira, Vania Maria [Centrais Eletricas do Norte do Brasil S.A. (ELETRONORTE), Brasilia, DF (Brazil)]. E-mail: ceon@eln.gov.br

    1998-07-01

    This work presents an analysis of the ELETRONORTE hydrothermal systems in the States of Amazonas, Rondonia and Amapa and the Tucurui HPP Interconnected System. The analysis ranges from the whole year of 1997 to September 1998, considering the strong influence of the El Nino phenomenon, initiated on April 1997, on the flows affluent to the reservoirs of Balbina, Samuel, Coaracy Nunes and Tucurui Hydroelectric Power Plants.