  1. TVA's nuclear power plant experience

    International Nuclear Information System (INIS)

    Willis, W.F.

    1979-01-01

    This paper reviews TVA's nuclear power plant design and construction experience in terms of schedule and capital costs. The completed plant in commercial operation at Browns Ferry and six additional plants currently under construction represent the nation's largest single commitment to nuclear power and an ultimate investment of $12 billion by 1986. The presentation is made in three separate phases. Phase one will recapitulate the status of the nuclear power industry in 1966 and set forth the assumptions used for estimating capital costs and projecting project schedules for the first TVA units. Phase two describes what happened to the program in the hectic early 1979's in terms of expansion of scope (particularly for safety features), the dramatic increase in regulatory requirements, vendor problems, stretchout of project schedules, and unprecedented inflation. Phase three addresses the assumptions used today in estimating schedules and plant costs for the next ten-year period

  2. Evaluation of NOX emissions from TVA coal-fired power plants

    International Nuclear Information System (INIS)

    Jones, J.W.; Stamey-Hall, S.

    1991-01-01

    The paper gives results of a preliminary evaluation of nitrogen oxide (NOx) emissions from 11 Tennessee Valley Authority (TVA) coal-fired power plants. Current EPA AP-42 emission factors for NOx from coal-fired utility boilers do not account for variations either in these emissions as a function of generating unit load, or in designs of boilers of the same general type, particularly wall-fired boilers. The TVA has compiled short-term NOx emissions data from 30 units at 11 TVA coal-fired plants. These units include cyclone, cell burner, single wall, opposed wall, single tangential, and twin tangential boiler firing designs. Tests were conducted on 29 of the 30 units at high load; 18 were also tested at reduced load. NOx emissions rates were calculated for each test and compared to the calculated rate for each boiler type using AP-42. Preliminary analysis indicates that: (1) TVA cyclone-fired units emit more NOx than estimated using AP-42; (2) TVA cell burner units emit considerably more NOx than estimated; (3) most TVA single-wall-fired units emit slightly more NOx than estimated; (4) most TVA single-furnace tangentially fired units emit less NOx than estimated at high load, but the same as (or more than) estimated at reduced load; and (5) most TVA twin-furnace tangentially fired units, at high load, emit slightly more NOx than estimated using AP-42

  3. TVA is no longer just another utility - Freeman

    International Nuclear Information System (INIS)

    Bailey, M.; Freeman, S.D.

    1984-01-01

    An interview with former Tennessee Valley Authority (TVA) chairman S. David Freeman finds him positive about TVA's future in continuing to demonstrate that the public interest dominates over the short-term interest. Cancelling eight nuclear plants were the board's most difficult decisions, and those decisions were delayed by a lack of accurate load forecasts and a need to educate the public. The halt to overbuilding and its goal of a 7% drop in demand by 1990 will keep TVA rates moderate. The area's abundant coal will be burned in an environmentally sound manner in the 12 coal-fired plants. There will also be 9 nuclear plants and, by the next century, integrated photovoltaic cells. Freeman credits TVA's success to hard work and new management. He considers himself neutral, but critical, of nuclear power because of the failure to develop sound waste managment. He faults the Reagan administration for failing to impose appliance efficiency standards

  4. Taylor Hydro plant goes live

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The 12.75 MW Taylor Hydroelectric Plant in Magrath, Alberta, synchronized its generator with the Alberta Power Grid and began production in April 2000. The plant is located on Government of Alberta irrigation works and is owned by Canadian Hydro Developers. During the irrigation season the plant will generate approximately 40 million kilowatt hours of zero-emission 'green' power for consumption, enough to power 5,000 homes for a year. The Taylor plant is a joint venture with EPCOR Power Development Corporation, a wholly-owned subsidiary of EPCOR Inc., the City of Edmonton utility. Canadian Hydro Developers also owns a 19 MW wind plant and a 6 MW gas plant in Alberta and five other 'run of river' hydro plants in Ontario and British Columbia. The company is committed to the concept of low-impact power generation; its ownership of wind run-of-river hydro and gas-fired facilities is proof of that commitment

  5. Whistleblowers ask Congress to investigate TVA's nuclear power program

    International Nuclear Information System (INIS)

    Lane, E.

    1993-01-01

    Congress should investigate the Tennessee Valley Authority's nuclear power plant construction and operations programs as soon as possible, a coalition of Tennessee environmentalists and whistleblowers told reporters at a press conference in Washington, DC. The Foundation for Global Sustainability and four employees of TVA nuclear plants called for congressional action because they contend the Nuclear Regulatory Commission and the Department of Labor have failed to act to protect whistleblowers who report nuclear safety problems. The foundation contends the economics of nuclear plant construction by TVA do not make sense and in the rush to finish the Watts Bar nuclear plant, which has been under construction for 20 years, TVA has ignored safety issues

  6. Optimal control systems in hydro power plants

    International Nuclear Information System (INIS)

    Babunski, Darko L.

    2012-01-01

    The aim of the research done in this work is focused on obtaining the optimal models of hydro turbine including auxiliary equipment, analysis of governors for hydro power plants and analysis and design of optimal control laws that can be easily applicable in real hydro power plants. The methodology of the research and realization of the set goals consist of the following steps: scope of the models of hydro turbine, and their modification using experimental data; verification of analyzed models and comparison of advantages and disadvantages of analyzed models, with proposal of turbine model for design of control low; analysis of proportional-integral-derivative control with fixed parameters and gain scheduling and nonlinear control; analysis of dynamic characteristics of turbine model including control and comparison of parameters of simulated system with experimental data; design of optimal control of hydro power plant considering proposed cost function and verification of optimal control law with load rejection measured data. The hydro power plant models, including model of power grid are simulated in case of island ing and restoration after breakup and load rejection with consideration of real loading and unloading of hydro power plant. Finally, simulations provide optimal values of control parameters, stability boundaries and results easily applicable to real hydro power plants. (author)

  7. TVA coal-gasification commercial demonstration plant project. Volume 5. Plant based on Koppers-Totzek gasifier. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    This volume presents a technical description of a coal gasification plant, based on Koppers-Totzek gasifiers, producing a medium Btu fuel gas product. Foster Wheeler carried out a conceptual design and cost estimate of a nominal 20,000 TPSD plant based on TVA design criteria and information supplied by Krupp-Koppers concerning the Koppers-Totzek coal gasification process. Technical description of the design is given in this volume.

  8. Romanian achievement in hydro-power plants

    International Nuclear Information System (INIS)

    Cardu, M.; Bara, T.

    1998-01-01

    This paper briefly deals with the achievements relating to Hydro-electric Power Plants within the process of development of the National Power System in Romania. Also presented is the Romanian industry contribution to hydro-electrical power plant equipment manufacturing. (author)

  9. MHD repowering of a 250 MWe unit of the TVA Allen Steam Plant

    International Nuclear Information System (INIS)

    Chapman, J.N.; Attig, R.C.

    1992-01-01

    In this paper coal fired MHD repowering is considered for the TVA Allen Steam Plant. The performance of the repowered plant is presented. Cost comparisons are made of the cost of repowering with MHD versus the cost of meeting similar standards by installing scrubbers and selective catalytic NO x reduction (SCNR). For repowering of a single 250 MW e unit, the costs favor scrubbing and SCNR. If one considers a single repowering of all three 250 MW e units by a single MHD topping cycle and boiler, MHD repowering is more economical. Environmental emissions from the repowered plant are estimated

  10. Physical model of a floating trash boom to control aquatic weeds at the TVA Widows Creek Fossil Plant

    International Nuclear Information System (INIS)

    Hopping, P.N.

    1991-01-01

    This paper reports that the Tennessee Valley Authority (TVA) Widows Creek Fossil plant seasonally encounters adverse accumulations of aquatic weeds at the intakes of the condenser cooling water pumps. To reduce the accumulations, a floating trash boom has been proposed for the intakes. To evaluate the hydraulic feasibility of a boom, a physical model of the intakes has been built at the TVA Engineering Laboratory. The model was used to determine the boom alignment and depth of skimming needed to successfully deflect weeds away from the intakes and provide self-cleaning

  11. Real-time meteorological data flow in support of TVA's radiological emergency plan

    International Nuclear Information System (INIS)

    Hunter, C.H.; Pittman, D.E.; Malo, J.E.

    1985-01-01

    The Tennessee Valley Authority (TVA) presently operates two nuclear power plants - Browns Ferry (3 units) and Sequoyah (2 units). Two additional plants are under construction. These are Watts Bar scheduled for commercial operation later this year, and Bellefonte (2 units), scheduled for operation near the end of the decade. Under regulations promulgated under 10 CFR Part 50, TVA has developed a Radiological Emergency Plan (REP) to facilitate assessment of the effects of a radiological accident at any of the operational plants. As part of the REP, TVA has developed a system for collecting, displaying, and reviewing, and disseminating real-time meteorological information collected at the nuclear plant sites. The flow of this information must be reliable and continuous so that prompt, informed decisions are possible. This system has been designed using guidance provided in applicable Nuclear Regulatory Commission (NRC) documents, most notably Supplement 1 to NUREG-0737 and Regularoty Guide (R.G.) 1.23. This paper presents a brief description of the REP meteorological support. Meteorological support for nuclear plant emergency preparedness at TVA nuclear plants has been provided for several years. The system has undergone numerous changes during this time, reflecting changes in regulatory guidance and experience gained in implementing the system through numerous drills and exercises. A brief discussion of some of this experience is also presented

  12. Control of occupational radiation exposures in TVA nuclear power plants - design and operating philosophy

    International Nuclear Information System (INIS)

    Belvin, E.A.; Lyon, M.; Beasley, E.G. Jr.; Zobel, W.; Stone, G.F.

    1976-01-01

    TVA has some 21,000 MWe of nuclear generation in various phases of design, construction, or operation. When Browns Ferry was designed in the late 1960's, there were no guidelines available regarding implant radiation control features, so TVA relied on good engineering and health physics judgement in developing its design and operating criteria for radiation protection. After two years of operation at Browns Ferry, the authors experience shows that their design criteria were in most cases adequate or more than adequate. However, several areas present continuing problems relative to radiation and contamination control. In view of the recent NRC ALARA guidelines, they have instituted a program to ensure that the ALARA concept is made an integral part of their design and operating plans. Administrative documents were issued giving management support to the ALARA concept. A 4-member management audit team consisting of representatives from their design, operating, and radiation protection groups was established to review the effectiveness of radiation protection design features and operating activities on a plant-by-plant basis. Reports and recommendations from these audits are sent to top-level management staff. Their goal is to maintain an audit-appraisal system consisting of in-plant awareness of radiation and contamination conditions, assessment of trends in occupational radiation exposures, and feedback to their designers regarding problems encountered during operation and maintenance activities

  13. TVA GIS-based biomass resource assessment

    Energy Technology Data Exchange (ETDEWEB)

    Noon, C.E. [Univ. of Tennessee, Knoxville, TN (United States)

    1993-12-31

    The focus of this paper is a computer-based system for estimating the costs of supplying wood fuel. The system is being developed for the Tennessee Valley Authority and is referred to as the Biomass Resource Assessment Version One (BRAVO) system. The main objective in developing the BRAVO system is to assist TVA in estimating the costs for supplying wood fuel to any one of its twelve coal-fired plants. The BRAVO system is developed within a Geographic Information System (GIS) platform and is designed to allow a user to perform {open_quotes}what if{close_quotes} analyses related to the costs of wood fuel supply. Three types of wood fuel are considered in the BRAVO system: mill residues, logging residues and short-rotation woody crops (SRWC). Each type of wood fuel has unique economic and supply characteristics. The input data for the system includes the specific locations, amount, and prices of the various types of wood fuel throughout the TVA region. The system input is completed by data on political boundaries, power plant locations, road networks and a model for estimating transportation costs as a function of distance. The result is a comprehensive system which includes information on all possible wood fuel supply joints, demand points and product movement costs. In addition, the BRAVO system has been designed to allow a user to perform sensitivity analysis on a variety of supply system parameters. This will enable TVA to thoroughly investigate the financial impacts of issues such as increased competition for wood fuel, environmental policies, fuel taxes, and regional economic cycles.

  14. TVA GIS-based biomass resource assessment

    International Nuclear Information System (INIS)

    Noon, C.E.

    1993-01-01

    The focus of this paper is a computer-based system for estimating the costs of supplying wood fuel. The system is being developed for the Tennessee Valley Authority and is referred to as the Biomass Resource Assessment Version One (BRAVO) system. The main objective in developing the BRAVO system is to assist TVA in estimating the cost for supplying wood fuel to any one of its twelve coal-fired power plants. The BRAVO system is developed within a Geographic Information System (GIS) platform and is designed to allow a user to perform open-quotes what ifclose quotes analyses related to the costs of wood fuel supply. Three types of wood fuel are considered in the Bravo system: mill residues, logging residues and short-rotation woody crops (SRWC). Each type of wood fuel has unique economic and supply characteristics. The input data for the system includes the specific locations, amounts, and prices of the various types of wood fuel throughout the TVA region. The system input is completed by data on political boundaries, power plant locations, road networks and a model for estimating transportation costs as a function of distance. The result is a comprehensive system which includes information on all possible wood fuel supply points, demand points and product movement costs. In additions, the BRAVO system has been designed to allow a user to perform sensitivity analysis on a variety of supply system parameters. This will enable TVA to thoroughly investigate the financial impacts of issues such as increased competition for wood fuel, environmental policies, fuel taxes, and regional economic cycles

  15. TVA reaps big savings by letting powerplant work to outside firms

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This abstract is the entire text of the article. In a report to Congress, the Tennessee Valley Authority says its shift to full reliance on outside contractors for powerplant construction and modification work saved a net $54M in the first half of 1992. TVA says that total savings from lower overhead and increased efficiency were $75M, but that was partially offset by $21M in one-time mobilization/de-mobilization charges. TVA has a budget of $1.7B this year for new plant and equipment. That will rise to over $2B in the next two years. About 70% of the work involves nuclear plant work. Several members of Congress from the area criticized TVA in mid-1991 when it cut more than 5,000 hourly construction jobs and several hundred salaried construction jobs. The agency said the cuts let it concentrate on power production and promised to make semi-annual reports to Congress detailing the results of contracting out. In the agency's first report, TVA Chairman John Waters says that it saved $19.2M in personnel costs and staff overhead over the six-month period ending June 30, 1992. At the same time, $21.8M was saved through increased construction efficiency and productivity. Waters also says that the switch caused minimal impact on the local work force. Contractors employed 6,166 craft workers on their TVA projects at mid-year, compared with the 5,200 dropped by the agency in mid-1991

  16. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  17. TVA and its rivals

    International Nuclear Information System (INIS)

    Feine, P.

    1997-01-01

    The long running opposition of a group of investor-owned electric utilities to the success of the federally-owned and subsidised Tennessee Valley Authority (TVA) is described. The TVA provides plentiful, affordable electric power to the many economically deprived residents of the southeastern United States, but there have been continued calls, most vocally by those electric utilities who would benefit financially from its demise, for reform of the power production giant, including withdrawal of its federal subsidies. In the manner of much US political manoevering claims and counter-claims are being pursued through the courts and via television advertising in an effort to sway public opinion against the publicly accountable TVA and towards privately owned utilities in the name of ''fair'' competition. (UK)

  18. Analysis of plume rise data from five TVA steam plants

    International Nuclear Information System (INIS)

    Anfossi, D.

    1985-01-01

    A large data set containing the measurements of the rise of plumes emitted by five TVA steam plants was examined. Particular attention was paid to the problem of the merging of the plumes emitted by adjacent stacks and to the role played by the wind angle in this respect. It was demonstrated that there is a noticeable rise enhancement of merged plumes with respect to single emissions, both in neutral and in stable conditions, as far as transversal and parallel plumes are concerned. For plumes advected normal to the row of the stacks the enhancement is noticeable only in the final stage of rise. The existence of a critical angle for merging suggested enhancement is noticeable only in the final stage of rise. The existence of a critical angle for merging suggested by Briggs was examined. Finally, a formula to describe plume rise in the transitional and in the final phase, both in neutral and stable conditions, is proposed; it was obtained by interpolation of two familiar Brigg's equations

  19. Clinical TVA-based studies: a general review

    Directory of Open Access Journals (Sweden)

    Thomas eHabekost

    2015-03-01

    Full Text Available In combination with whole report and partial report tasks, the Theory of Visual Attention (TVA can be used to estimate individual differences in five basic attentional parameters: The visual processing speed, the storage capacity of visual short-term memory, the perceptual threshold, the efficiency of top-down selectivity, and the spatial bias of attentional weighting. TVA-based assessment has been used in about 30 studies to investigate attentional deficits in a range of neurological and psychiatric conditions: (a neglect and simultanagnosia, (b reading disturbances, (c aging and neurodegenerative diseases, and most recently (d neurodevelopmental disorders. The article introduces TVA based assessment, discusses its methodology and psychometric properties, and reviews the progress made in each of the four research fields. The empirical results demonstrate the general usefulness of TVA-based assessment for many types of clinical neuropsychological research. The method’s most important qualities are cognitive specificity and theoretical grounding, but it is also characterized by good reliability and sensitivity to minor deficits. The review concludes by pointing to promising new areas for clinical TVA-based research.

  20. Analysis of Axial Turbine Pico-Hydro Electrical Power Plant in North Sulawesi Indonesia

    Science.gov (United States)

    Sangari, F. J.; Rompas, P. T. D.

    2018-02-01

    This study presents analysis of pico-hydro electrical power plant in North Sulawesi, Indonesia. The objective of this study is to get a design of axial turbine pico-hydro electrical power plant. The method used the study of literature, survey the construction site of the power plant and the characteristics of the location being a place of study, analysis of hydropower ability and analyzing costs of power plant. The result showed that the design of axial turbine pico-hydro installation is connected to a generator to produce electrical energy maximum can be used for household needs in villages. This analyze will be propose to local government of Minahasa, North Sulawesi, Indonesia.

  1. Copper-Silver Alloy Depositions Using Thermionic Vacuum ARC (TVA)

    International Nuclear Information System (INIS)

    Akan, T.

    2004-01-01

    TVA is a plasma source generating pure metal vapor plasma and consists of a heated cathode emitting thermo electrons and an anode containing material to be evaporated. We used Cu and Ag pieces as anode materials and produced their alloys by electron bombarding. Cu-Ag alloys in various mass ratios were prepared by using the TVA and the TVA discharges were generated in the vapors of these alloys. The volt-ampere characteristics of the TVA discharges generated in the vapors of these alloys were investigated with respect to the ratio of Ag in the Cu-Ag alloy. Cu-Ag alloy thin films with various mass ratios were deposited onto the glass substrates by using their TVA discharges. The ratios of Cu and Ag in the thin Cu-Ag alloy films were found using scanning electron microscope-energy dispersive xray (SEM-EDX) microanalyses

  2. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  3. Gross greenhouse gas fluxes from hydro-power reservoir compared to thermo-power plants

    International Nuclear Information System (INIS)

    Santos, Marco Aurelio dos; Pinguelli Rosa, Luiz; Sikar, Bohdan; Sikar, Elizabeth; Santos, Ednaldo Oliveira dos

    2006-01-01

    This paper presents the findings of gross carbon dioxide and methane emissions measurements in several Brazilian hydro-reservoirs, compared to thermo power generation. The term 'gross emissions' means gas flux measurements from the reservoir surface without natural pre-impoundment emissions by natural bodies such as the river channel, seasonal flooding and terrestrial ecosystems. The net emissions result from deducting pre-existing emissions by the reservoir. A power dam emits biogenic gases such as CO 2 and CH 4 . However, studies comparing gas emissions (gross emissions) from the reservoir surface with emissions by thermo-power generation technologies show that the hydro-based option presents better results in most cases analyzed. In this study, measurements were carried in the Miranda, Barra Bonita, Segredo, Tres Marias, Xingo, and Samuel and Tucurui reservoirs, located in two different climatological regimes. Additional data were used here from measurements taken at the Itaipu and Serra da Mesa reservoirs. Comparisons were also made between emissions from hydro-power plants and their thermo-based equivalents. Bearing in mind that the estimated values for hydro-power plants include emissions that are not totally anthropogenic, the hydro-power plants studied generally posted lower emissions than their equivalent thermo-based counterparts. Hydro-power complexes with greater power densities (capacity/area flooded-W/m 2 ), such as Itaipu, Xingo, Segredo and Miranda, have the best performance, well above thermo-power plants using state-of-the-art technology: combined cycle fueled by natural gas, with 50% efficiency. On the other hand, some hydro-power complexes with low-power density perform only slightly better or even worse than their thermo-power counterparts

  4. Decision making algorithms for hydro-power plant location

    CERN Document Server

    Majumder, Mrinmoy

    2013-01-01

    The present study has attempted to apply the advantage of neuro-genetic algorithms for optimal decision making in maximum utilization of natural resources. Hydro-power is one of the inexpensive, but a reliable source of alternative energy which is foreseen as the possible answer to the present crisis in the energy sector. However, the major problem related to hydro-energy is its dependency on location. An ideal location can produce maximum energy with minimum loss. Besides, such power-plant also requires substantial amount of land which is a precious resource nowadays due to the rapid and unco

  5. Design process and philosophy of TVA's latest advance control room complex

    International Nuclear Information System (INIS)

    Owens, G.R.; Masters, D.W.

    1979-01-01

    TVA's latest nuclear power plant control room design includes a greater emphasis on human factors as compared to their earlier plant designs. This emphasis has resulted in changes in the overall design philosophy and design process. This paper discusses some of the prominent design features of both the control room and the surrounding control room complex. In addition, it also presents some of the important activities involved in the process of developing the advanced control room design

  6. Hydro-engineering structure and Liptovska Mara Pumped Storage Power Plant

    International Nuclear Information System (INIS)

    Regula, E.

    2005-01-01

    In this paper thirty years history of the Hydro-engineering structure and Liptovska Mara Pumped Storage Power Plant (PSPP) is presented. In 1975 year the Liptovska Mara PSPP was commissioned. There are 2 Kaplan turbines and 2 Derezias reversible turbines with a total installed power 198 MW. The average annual output is 134.5 GWh. As a part of this hydro-engineering structure is Besenova Small-scale power plants with 2 turbines and with installed power 4.64 MW. The average annual output consists 18.3 GWh. There up to end of 2004 year 3,620.172 MWh of electricity was produced. Environmental effects are discussed

  7. Unmanned operation of Hydro Power Plants

    International Nuclear Information System (INIS)

    Regula, E.

    2008-01-01

    Intentions to launch unmanned operation are no news, the very first occurred in Hydro Power Plants (HPP) at the time when the first computer technology was implemented into process of power generation, i.e. no later than in 1960 s . ENEL entering Slovenske elektrarne not only revived but significantly accelerated the implementation process of unmanned operation. Experience of ENEL says that unmanned operation means better reliability of the HPP and this is the priority. (author)

  8. Impact on the aquatic environment of hydro-peaking in hydroelectric plants

    International Nuclear Information System (INIS)

    Sabaton, C.; Lauters, F.; Valentin, S.

    1996-01-01

    There are a number of types of hydroelectric installations on French rivers. Some of these intermittently turbine water stored in dammed reservoirs, in order to use available reserves at the most opportune moment for power generation. These plants, run under 'hydro-peaking' management procedures, cause variations in discharge in river sections downstream of the restitution, on a daily or weekly scale. To answer questions concerning the impact of such variations in discharge on the aquatic environment, EDF launched a research program aimed at describing and better understanding the physical and biological phenomena related to hydro-peaking and assessing the possible impact of this type of plant management on French streams. Seven sites subjects to hydro-peaking were studied on rivers with mean flow rates lower than 20 m 3 /s (which corresponds to over 65 % of EDF hydro-peaking sites). Four themes in particular were examined: hydraulic characterization of hydro-peaking, modifications in thermal regime and water quality, response of benthic invertebrates and response of fish populations to hydro-peaking. For fish as well as for invertebrates, the role of the base discharge - in the absence of peaking flow - and that of the morphology of the river bed (and, in particular, the presence of shelter for fish) during periods of strong discharge were clearly highlighted. Impact assessment requires a precise diagnosis of the state of biocenoses. To carry out such a diagnosis, one must reason in terms of species, life phase (particularly the most sensitive phases) and population structure as well as the type of stream and the faunizone involved. A risk assessment is possible by means of simultaneous study of the morphology of the river bed and the response of the signal generated by hydro-peaking in terms of hydrology and physical characteristics downstream of the restitution. (authors)

  9. Comparative fate of an organochlorine, chlordecone, and a related compound, chlordecone-5b-hydro, in soils and plants.

    Science.gov (United States)

    Clostre, Florence; Cattan, Philippe; Gaude, Jean-Marie; Carles, Céline; Letourmy, Philippe; Lesueur-Jannoyer, Magalie

    2015-11-01

    We address the problem of the comparative environmental fate of a pesticide, chlordecone (CLD), and a related compound, chlordecone-5b-hydro (CLD-5b-hydro). We used a large database including data from two types of contaminated volcanic soils, andosol and nitisol, and thirteen crops grown in the French West Indies in historically polluted soils. We performed in-depth statistical analysis of the effect of different parameters (soil type, crop, organ, etc.) on the ratio of CLD-5b-hydro to CLD in both soils and plants. The environmental fate of the two compounds differed depending on the type of soil. Proportionally, more CLD-5b-hydro than CLD was measured in nitisols than in andosols. Compared to CLD, we also found a preferential transfer of CLD-5b-hydro from the soil to the plant. Finally, mobilization of the two compounds differed according to the species of crop but also within the plant, with increasing ratios from the roots to the top of the plant. The properties of the compound played a key role in the underlying processes. Because CLD-5b-hydro is more soluble in water and has a lower K(ow) than CLD, CLD-5b-hydro (1) was more easily absorbed from soils by plants, (2) was less adsorbed onto plant tissues and (3) was transported in greater quantities through the transpiration stream. Due to the amounts of CLD-5b-hydro we measured in some plant parts such as cucurbit fruits, an assessment of the toxicity of this CLD monodechlorinated product is recommended. Copyright © 2015 Elsevier B.V. All rights reserved.

  10. Pumped Storage Hydro Power Plant Cierny Vah

    International Nuclear Information System (INIS)

    Regula, E.

    1998-01-01

    In this leaflet the pump-storage power plant Cierny Vah is presented. A Cierny Vah pumped storage power plant (PSP) has been designed and built for providing the reliable and quality electric energy supply and for covering load changes of an electrification system. (ES). It is mainly the pumped storage hydro power plants plants which in our conditions are the sources operatively covering the sudden changes of the ES load from the ecological, economic but mainly from the operational point of view. The electric energy generation volume is not the primary standpoint but especially their control functions in the ES. During the building of the Cierny Vah PSP the peak operation with the daily accumulation, participation in frequency control and output in ES and the compensation function in ES were to be its main tasks. After putting it into operation by especially after its becoming independent of the Slovak ES in 1994 the static functions (energy generation from pumping, balance output reserves, daily control, ...) gave way to dynamic functions which gained greater importance. After interconnection of the ES with the UCPTE West European Association in which there are besides other things, the strict criteria for observing balance outputs, the main functions of PSPs are as follows: (1) Dynamic services for ES; (2) Dispatching reserve for the fall out of the greatest ES block; (3) Observing the foreign cooperation balance agreed; (4) Compensation of peaks and also of sudden daily load diagram reductions. Technical parameters of the upper and lower reservoir are described. The hydro power plant is a body lower reservoir. In it there are six vertical pumping aggregates in the three machine layout: the motor-generator - the turbine - the pump. Between the turbine and the pump there is a hydraulically controlled claw clutch engaging at rest and disengaging also during the aggregate operation. During pumping air is involved inside the turbine. The Francis turbines have a

  11. Thermionic vacuum arc (TVA) technique for magnesium thin film deposition

    Energy Technology Data Exchange (ETDEWEB)

    Balbag, M.Z., E-mail: zbalbag@ogu.edu.t [Eskisehir Osmangazi University, Education Faculty, Primary Education, Meselik Campus, Eskisehir 26480 (Turkey); Pat, S.; Ozkan, M.; Ekem, N. [Eskisehir Osmangazi University, Art and Science Faculty, Physics Department, Eskisehir 26480 (Turkey); Musa, G. [Ovidius University, Physics Department, Constanta (Romania)

    2010-08-15

    In this study, magnesium thin films were deposited on glass substrate by the Thermionic Vacuum Arc (TVA) technique for the first time. We present a different technique for deposition of high-quality magnesium thin films. By means of this technique, the production of films is achieved by condensing the plasma of anode material generated using Thermionic Vacuum Arc (TVA) under high vacuum conditions onto the surface to be coated. The crystal orientation and morphology of the deposited films were investigated by using XRD, EDX, SEM and AFM. The aim of this study is to search the use of TVA technique to coat magnesium thin films and to determine some of the physical properties of the films generated. Furthermore, this study will contribute to the scientific studies which search the thin films of magnesium or the compounds containing magnesium. In future, this study will be preliminary work to entirely produce magnesium diboride (MgB{sub 2}) superconductor thin film with the TVA technique.

  12. TVA nuclear power: Management of the nuclear program through personal services contracts

    International Nuclear Information System (INIS)

    1987-01-01

    Mr. Steven White, a retired admiral, is serving as manager of the TVA Office of Nuclear Power. GAO previously concluded that Mr. White's retention under contractual arrangements constituted the improper use of a personal services contract and represented a circumvention of the statutory ceiling on salary payments to TVA employees. This report finds that Mr. White's rate of pay is within the range of the salaries paid by a sample of nonfederal utilities to their top executives and is over two and a half times the average salary paid to executives who hold positions which appear to have responsibility for managing the utilities' power or nuclear power operations. GAO also found that (1) TVA's Office of Nuclear Power has employed an additional 25 persons since 1986 under arrangements similar to the employing arrangements of Mr. White and (2) TVA's Nuclear Safety Review staff no longer reports directly to the TVA Board of Directors and General Manager. It has relocated from Knoxville, Tennessee to Chattanooga, Tennessee

  13. Hydro-thermal power flow scheduling accounting for head variations

    International Nuclear Information System (INIS)

    El-Hawary, M.E.; Ravindranath, K.M.

    1992-01-01

    In this paper the authors treat the problem of optimal economic operation of hydrothermal electric power systems with variable head hydro plants employing the power flow equations to represent the network. Newton's method is used to solve the problem for a number of test systems. A comparison with solutions with fixed head is presented. In general the optimal schedule requires higher slack bus and thermal power generation and cost in the case of variable head hydro plant than that required by the fixed head hydro plant in all demand periods. Correspondingly, the hydro generation is less in the case of variable head hydro plant compared to fixed head hydro plant. A negligible difference in voltage magnitudes in all the time intervals, but it is observed that slightly higher voltages occur in the case of the fixed head hydro plant. Higher power and energy losses occur in the case of variable head hydro plants compared to the fixed head hydro plants

  14. Integrated operation of hydro thermal system

    International Nuclear Information System (INIS)

    Nanthakumar, J.

    1994-01-01

    Long-term power system expansion planning studies are carried out to meet the electricity requirement in the future. Prior to the expansion planning studies, it is essential to know the energy potential of the existing generating system, especially the hydro power plants. Detailed hydro thermal stimulation studies of the integrated system is therefore carried out to determine the best way to maximise the hydro energy of the existing and committed plants. The results of the integrated system simulated model are stored in numerous files and are available for retrieval. Most important output used for expansion analysis is the energy production of each hydro plant. The annual hydro energy potential of the total hydro system of Sri Lanka for the hydrological year from 1949 to 1988 is given. Hydro condition data with different probability levels are also indicated

  15. New markets for small-scale hydro

    International Nuclear Information System (INIS)

    Maurer, E.A.

    1997-01-01

    The market for small and medium sized hydro-electric power plant is more attractive than ever. The boom in Europe has increasingly spread to the emerging countries, and here too small hydro plays an important ecological role. In addition to new plant rehabilitation of 'historical' plant is now a major factor. The last few years have seen a market shift from single machine components to complete plant and systems, requiring a strategy re-think on the part of larger companies. Following the influx of private capital into the power industry, business conditions have also undergone a thorough transformation. In place of 'fast money', hydro power offers the prospect of earning longer-term, sustainable money'. The term small-scale hydro-electric power (or simply 'small hydro') is used slightly differently depending on the country and market. Here, it is used to denote plant with turbines up to 10 MW. (Author)

  16. An approach to the investment analysis of small and medium hydro-power plants

    International Nuclear Information System (INIS)

    Forouzbakhsh, F.; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in 'Bookan, Iran' and SHPP in 'Nari, Iran'), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially

  17. A Comparison of Prediction Methods for Design of Pump as Turbine for Small Hydro Plant: Implemented Plant

    Science.gov (United States)

    Naeimi, Hossein; Nayebi Shahabi, Mina; Mohammadi, Sohrab

    2017-08-01

    In developing countries, small and micro hydropower plants are very effective source for electricity generation with energy pay-back time (EPBT) less than other conventional electricity generation systems. Using pump as turbine (PAT) is an attractive, significant and cost-effective alternative. Pump manufacturers do not normally provide the characteristic curves of their pumps working as turbines. Therefore, choosing an appropriate Pump to work as a turbine is essential in implementing the small-hydro plants. In this paper, in order to find the best fitting method to choose a PAT, the results of a small-hydro plant implemented on the by-pass of a Pressure Reducing Valve (PRV) in Urmia city in Iran are presented. Some of the prediction methods of Best Efficiency Point of PATs are derived. Then, the results of implemented project have been compared to the prediction methods results and the deviation of from measured data were considered and discussed and the best method that predicts the specifications of PAT more accurately determined. Finally, the energy pay-back time for the plant is calculated.

  18. An approach to the investment analysis of small and medium hydro-power plants

    DEFF Research Database (Denmark)

    Forouzbakhsh, Farshid; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Sincea large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments,however it is possible...

  19. An approach to the investment analysis of small and medium hydro-power plants

    Energy Technology Data Exchange (ETDEWEB)

    Forouzbakhsh, F. [University of Tehran (Iran). Faculty of Engineering; Hosseini, S.M.H. [Islamic Azad University, Tehran (Iran). Faculty of Engineering; Vakilian, M. [Sharif Institute of Technology, Tehran (Iran). Faculty of Electrical Engineering

    2007-02-15

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in ''Bookan, Iran'' and SHPP in ''Nari, Iran''), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially. (author)

  20. 18 CFR 1304.208 - Shoreline stabilization on TVA-owned residential access shoreland.

    Science.gov (United States)

    2010-04-01

    ... of gabions and riprap to stabilize eroded shorelines. (1) The riprap material must be quarry-run stone, natural stone, or other material approved by TVA. (2) Rubber tires, concrete rubble, or other... concrete, gabions, or other materials acceptable to TVA. Railroad ties, rubber tires, broken concrete...

  1. TVA on competition in the coal and uranium industries

    International Nuclear Information System (INIS)

    Norman, D.; Guerrieri, U.A.

    1979-01-01

    A critique of the Tennessee Valley Authority (TVA) review of competition in the two industries reviews several versions and updates of the report and compares them with the Wilson report. The authors find inconsistencies and errors in TVA's arguments and evidence. They argue that the reports do not demonstrate a cause and effect relationship between oil company entry into coal and uranium markets and rising prices and concentration. Instead the reports merely assert such a relationship, then use their assertion as the sole basis for policy recommendations. 1 figure, 6 tables

  2. TVA-Based Assessment of Visual Attention Using Line-Drawings of Fruits and Vegetables

    Directory of Open Access Journals (Sweden)

    Tianlu Wang

    2018-02-01

    Full Text Available Visuospatial attention and short-term memory allow us to prioritize, select, and briefly maintain part of the visual information that reaches our senses. These cognitive abilities are quantitatively accounted for by Bundesen’s theory of visual attention (TVA; Bundesen, 1990. Previous studies have suggested that TVA-based assessments are sensitive to inter-individual differences in spatial bias, visual short-term memory capacity, top-down control, and processing speed in healthy volunteers as well as in patients with various neurological and psychiatric conditions. However, most neuropsychological assessments of attention and executive functions, including TVA-based assessment, make use of alphanumeric stimuli and/or are performed verbally, which can pose difficulties for individuals who have troubles processing letters or numbers. Here we examined the reliability of TVA-based assessments when stimuli are used that are not alphanumeric, but instead based on line-drawings of fruits and vegetables. We compared five TVA parameters quantifying the aforementioned cognitive abilities, obtained by modeling accuracy data on a whole/partial report paradigm using conventional alphabet stimuli versus the food stimuli. Significant correlations were found for all TVA parameters, indicating a high parallel-form reliability. Split-half correlations assessing internal reliability, and correlations between predicted and observed data assessing goodness-of-fit were both significant. Our results provide an indication that line-drawings of fruits and vegetables can be used for a reliable assessment of attention and short-term memory.

  3. The application of the EMAS-ordinance to small hydro-power-plants

    International Nuclear Information System (INIS)

    Patek, R.

    2000-01-01

    The application of the eco-management and audit scheme ordinance to small hydro-power-plants deals with the possibility to take an environmental-relevant audition on sites of small hydro-power-plants to achieve the environmental EMAS-certificate. Within the realization of the acquired improvement steps also the efficiency of the power plants should be increased that the audit also becomes interesting in economic matters. Contents: after explaining the legal frame being prescribed by the European Community, its interpretation and relevance for the sites of SHP, common impacts of these on the environment are particularized. From these facts a valuation-catalogue has been developed, which will be used by the power plant-owners for the assessment of their sites to take part in the EMAS-system. This catalogue is split up into six modules, which comprise all possible valuation areas which can appear concerning the different kinds of plants. These modules are: MODUL A: backwater area; MODUL B: weir; MODUL C: powerhouse; MODUL D: tail water area; MODUL E: diversion channel / penstock; MODUL F: diversion section. Furthermore three submodules to gather common data concerning plant and river have been created. At the development of the catalogue there was particularly attached importance to a user-friendly application. The goal was to realize the valuation by the plant owners to minimize costs. To take objectiveness into account the module-catalogue was created in a way that auditors (the power plant owners) must not formulate specifications by themselves; the possible assessments only have to be marked with a cross at the corresponding parameters, which have been listed up. (author)

  4. Optimal operation of a pumped-storage hydro plant that compensates the imbalances of a wind power producer

    OpenAIRE

    Duque, Álvaro Jaramillo; Castronuovo, Edgardo D.; Sánchez, Ismael; Usaola, Julio

    2011-01-01

    The participation of wind energy in electricity markets requires providing a forecast for future energy production of a wind generator, whose value will be its scheduled energy. Deviations from this schedule because of prediction errors could imply the payment of imbalance costs. In order to decrease these costs, a joint operation between a wind farm and a hydro-pump plant is proposed; the hydro-pump plant changes its production to compensate wind power prediction errors. In order to optimize...

  5. Long-term generation scheduling of Xiluodu and Xiangjiaba cascade hydro plants considering monthly streamflow forecasting error

    International Nuclear Information System (INIS)

    Xie, Mengfei; Zhou, Jianzhong; Li, Chunlong; Zhu, Shuang

    2015-01-01

    Highlights: • Monthly streamflow forecasting error is considered. • An improved parallel progressive optimality algorithm is proposed. • Forecasting dispatching chart is manufactured accompanying with a set of rules. • Applications in Xiluodu and Xiangjiaba cascade hydro plants. - Abstract: Reliable streamflow forecasts are very significant for reservoir operation and hydropower generation. But for monthly streamflow forecasting, the forecasting result is unreliable and it is hard to be utilized, although it has a certain reference value for long-term hydro generation scheduling. Current researches mainly focus on deterministic scheduling, and few of them consider the uncertainties. So this paper considers the forecasting error which exists in monthly streamflow forecasting and proposes a new long-term hydro generation scheduling method called forecasting dispatching chart for Xiluodu and Xiangjiaba cascade hydro plants. First, in order to consider the uncertainties of inflow, Monte Carlo simulation is employed to generate streamflow data according to the forecasting value and error distribution curves. Then the large amount of data obtained by Monte Carlo simulation is used as inputs for long-term hydro generation scheduling model. Because of the large amount of streamflow data, the computation speed of conventional algorithm cannot meet the demand. So an improved parallel progressive optimality algorithm is proposed to solve the long-term hydro generation scheduling problem and a series of solutions are obtained. These solutions constitute an interval set, unlike the unique solution in the traditional deterministic long-term hydro generation scheduling. At last, the confidence intervals of the solutions are calculated and forecasting dispatching chart is proposed as a new method for long-term hydro generation scheduling. A set of rules are proposed corresponding to forecasting dispatching chart. The chart is tested for practical operations and achieves

  6. O etici poslovanja i poduzetništva "business ethics"

    OpenAIRE

    Bozanić, Anton

    1998-01-01

    O etici poslovanja i poduzetništva ili gospodarstva i poduzetništva, opće poznatoj kao "business ethics", mnogo se danas raspravlja i piše, posebno u visoko razvijenijim zemljama, ali i svim ostalim koje žele uhvatiti korak sa svjetskim tržištem i vrlo dinamičnim izazovima konkurencije, ponude i potražnje. Sve više Jača svijest kako personalna etika - toliko važna u svakidašnjem ljudskom životu - nije sama po sebi dostatna kod donošenja etičkih odluka, Jer su u suvremenom gospodarskom...

  7. Visual attention capacity: a review of TVA-based patient studies.

    Science.gov (United States)

    Habekost, Thomas; Starrfelt, Randi

    2009-02-01

    Psychophysical studies have identified two distinct limitations of visual attention capacity: processing speed and apprehension span. Using a simple test, these cognitive factors can be analyzed by Bundesen's Theory of Visual Attention (TVA). The method has strong specificity and sensitivity, and measurements are highly reliable. As the method is theoretically founded, it also has high validity. TVA-based assessment has recently been used to investigate a broad range of neuropsychological and neurological conditions. We present the method, including the experimental paradigm and practical guidelines to patient testing, and review existing TVA-based patient studies organized by lesion anatomy. Lesions in three anatomical regions affect visual capacity: The parietal lobes, frontal cortex and basal ganglia, and extrastriate cortex. Visual capacity thus depends on large, bilaterally distributed anatomical networks that include several regions outside the visual system. The two visual capacity parameters are functionally separable, but seem to rely on largely overlapping brain areas.

  8. ULOGA I VAŽNOST INTELEKTUALNOG VLASNIŠTVA U PODUZETNIŠTVU

    OpenAIRE

    Milović, Tanja; Mustapić, Zrinka; Moslavac-Forjan, Davorka

    2016-01-01

    Poduzetnička aktivnost pokretač je ekonomskog rasta nacionalne ekonomije. Ona je u velikoj mjeri vezana uz razvoj inovativnih proizvoda i usluga, čiji je ključni aspekt zaštita intelektualnog vlasništva. U suvremenom poduzetničkom okruženju zaštita i primjena zaštite intelektualnog vlasništva ima značajnu ulogu u uspješnom razvoju inovacija i razvoju poslovanja općenito te time predstavlja poticaj poduzetničkoj aktivnosti. Najrazvijenije ekonomije imaju i najveći stupanj zaštite intelektualno...

  9. Optimal sizing of utility-scale photovoltaic power generation complementarily operating with hydropower: A case study of the world’s largest hydro-photovoltaic plant

    International Nuclear Information System (INIS)

    Fang, Wei; Huang, Qiang; Huang, Shengzhi; Yang, Jie; Meng, Erhao; Li, Yunyun

    2017-01-01

    Highlights: • Feasibility of complementary hydro-photovoltaic operation across the world is revealed. • Three scenarios of the novel operation mode are proposed to satisfy different load demand. • A method for optimally sizing a utility-scale photovoltaic plant is developed by maximizing the net revenue during lifetime. • The influence of complementary hydro-photovoltaic operation upon water resources allocation is investigated. - Abstract: The high variability of solar energy makes utility-scale photovoltaic power generation confront huge challenges to penetrate into power system. In this paper, the complementary hydro-photovoltaic operation is explored, aiming at improving the power quality of photovoltaic and promoting the integration of photovoltaic into the system. First, solar-rich and hydro-rich regions across the world are revealed, which are suitable for implementing the complementary hydro-photovoltaic operation. Then, three practical scenarios of the novel operation mode are proposed for better satisfying different types of load demand. Moreover, a method for optimal sizing of a photovoltaic plant integrated into a hydropower plant is developed by maximizing the net revenue during lifetime. Longyangxia complementary hydro-photovoltaic project, the current world’s largest hydro-photovoltaic power plant, is selected as a case study and its optimal photovoltaic capacities of different scenarios are calculated. Results indicate that hydropower installed capacity and annual solar curtailment rate play crucial roles in the size optimization of a photovoltaic plant and complementary hydro-photovoltaic operation exerts little adverse effect upon the water resources allocation of Longyangxia reservoir. The novel operation mode not only improves the penetration of utility-scale photovoltaic power generation but also can provide a valuable reference for the large-scale utilization of other kinds of renewable energy worldwide.

  10. Adapting the Theory of Visual Attention (TVA) to model auditory attention

    DEFF Research Database (Denmark)

    Roberts, Katherine L.; Andersen, Tobias; Kyllingsbæk, Søren

    Mathematical and computational models have provided useful insights into normal and impaired visual attention, but less progress has been made in modelling auditory attention. We are developing a Theory of Auditory Attention (TAA), based on an influential visual model, the Theory of Visual...... Attention (TVA). We report that TVA provides a good fit to auditory data when the stimuli are closely matched to those used in visual studies. In the basic visual TVA task, participants view a brief display of letters and are asked to report either all of the letters (whole report) or a subset of letters (e...... the auditory data, producing good estimates of the rate at which information is encoded (C), the minimum exposure duration required for processing to begin (t0), and the relative attentional weight to targets versus distractors (α). Future work will address the issue of target-distractor confusion, and extend...

  11. Modelling auditory attention: Insights from the Theory of Visual Attention (TVA)

    DEFF Research Database (Denmark)

    Roberts, K. L.; Andersen, Tobias; Kyllingsbæk, Søren

    modelled using a log-logistic function than an exponential function. A more challenging difference is that in the partial report task, there is more target-distractor confusion for auditory than visual stimuli. This failure of object-formation (prior to attentional object-selection) is not yet effectively......We report initial progress towards creating an auditory analogue of a mathematical model of visual attention: the ‘Theory of Visual Attention’ (TVA; Bundesen, 1990). TVA is one of the best established models of visual attention. It assumes that visual stimuli are initially processed in parallel......, and that there is a ‘race’ for selection and representation in visual short term memory (VSTM). In the basic TVA task, participants view a brief display of letters and are asked to report either all of the letters (whole report) or a subset of the letters (e.g., the red letters; partial report). Fitting the model...

  12. Comparison of simulated and measured response of load rejection on A hydro power plant model with mixed mode nonlinear controller

    Energy Technology Data Exchange (ETDEWEB)

    Babunski, Darko; Tuneski, Atanasko; Zaev, Emil [Faculty of Mechanical Engineering, ' Ss. Cyril and Methodius' University, Skopje (Macedonia, The Former Yugoslav Republic of)

    2014-07-01

    Revised Hydro Power Plant model of the IEEE working group recommended converted to state space model is used for simulation of transient response of hydro turbine, and verification was made using measurements of transients from real Hydro Power Plant (HPP). Nonlinear mixed model controller was designed and implemented into complete HPP simulation model and compared with PID with real parameters used in HPP, and with adjusted PID parameters with consideration of smallest frequency error. Verification of performance of the model was made comparing model response with measured load rejection, which is worst case of HPP operation. (Author)

  13. 18 CFR 1314.4 - Law governing the rights and obligations of TVA and Reserve Banks; law governing the rights of...

    Science.gov (United States)

    2010-04-01

    ... rights and obligations of TVA and Reserve Banks; law governing the rights of any Person against TVA and... FEDERAL RESERVE BANKS § 1314.4 Law governing the rights and obligations of TVA and Reserve Banks; law governing the rights of any Person against TVA and Reserve Banks; law governing other interests. (a) Except...

  14. Ontario Hydro Research Division annual report 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The Research Division of Ontario Hydro conducts research in the fields of chemistry, civil engineering, electrical engineering, mechanical engineering, metallurgy, and operations. Much of the research has a bearing on the safe, environmentally benign operation of Ontario Hydro's nuclear power plants. Particular emphasis has been placed on nuclear plant component aging and plant life assurance

  15. Small hydro: Policy and potential in Spain

    International Nuclear Information System (INIS)

    Gutierrez, C.

    2001-01-01

    In Spain, the benefits of small-scale (less than 10 MW) hydro are apparently rarely appreciated and there is little support from European institutions. The article suggests that small hydro technology can make a significant contribution to the country's energy requirements and create employment, provided certain obstacles can be removed. Data on the number of small hydros in Spain, and of recent installations are given; the share of hydro in Spain's total energy production is 2.5%. The low environmental impact of hydro is extolled, and the conclusions of a recent study of 'environmental impacts of the production of electricity' are listed. There are said to be unreasonable administrative obstacles; for example, it is more difficult to obtain permission to refurbish a 100 kW hydro plant in Castilla y Leon than it is to install a 30,000 kW gas plant. Some details relating to the affect of hydro on aquatic ecosystems, noise levels, and water quality, are given

  16. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  17. Overview of autoventing turbine technology development project

    International Nuclear Information System (INIS)

    Waldrop, W.R.

    1991-01-01

    This paper reports on low concentrations of dissolved oxygen (DO) in the discharge of hydro plants which represents one of the most significant environmental concerns confronting the hydropower industry. This is especially of concern to utilities attempting to relicense older plants and to build new facilities. One method which shows promise is the autoventing turbine (AVT). The concept of an AVT involves air to be aspirated into the water as it passes through the turbine whenever concentrations of DO are less than desired. Because of this simple and natural process of aeration, the AVT promises to be more cost efficient and reliable than any of the other techniques. This has been demonstrated through experimentation at TVA's Norris Dam. An applied research project is being conducted to develop experimental and numerical methods to allow for reliable design and deployment of this new environmentally improved hydroturbine. TVA is providing overall coordination for this research which is being performed cooperatively with the U.S. Army Corps of Engineers, the U.S. Bureau of Reclamation, and the Iowa Institute of Hydraulic Research. This applied research project is fully integrated with a scale model test program jointly supported and conducted by TVA and Voith Hydro to test alternative locations for venting air into replacement turbine runners for Norris Dam

  18. DAILY SCHEDULING OF SMALL HYDRO POWER PLANTS DISPATCH WITH MODIFIED PARTICLES SWARM OPTIMIZATION

    Directory of Open Access Journals (Sweden)

    Sinvaldo Rodrigues Moreno

    2015-04-01

    Full Text Available This paper presents a new approach for short-term hydro power scheduling of reservoirs using an algorithm-based Particle Swarm Optimization (PSO. PSO is a population-based algorithm designed to find good solutions to optimization problems, its characteristics have encouraged its adoption to tackle a variety of problems in different fields. In this paper the authors consider an optimization problem related to a daily scheduling of small hydro power dispatch. The goal is construct a feasible solution that maximize the cascade electricity production, following the environmental constraints and water balance. The paper proposes an improved Particle Swarm Optimization (PSO algorithm, which takes advantage of simplicity and facility of implementation. The algorithm was successfully applied to the optimization of the daily schedule strategies of small hydro power plants, considering maximum water utilization and all constraints related to simultaneous water uses. Extensive computational tests and comparisons with other heuristics methods showed the effectiveness of the proposed approach.

  19. An artificial intelligence (AI) NOx/heat rate optimization system for Ontario Hydro`s fossil generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Luk, J.; Frank, A.; Bodach, P. [Ontario Hydro, Toronto, ON (Canada); Warriner, G. [Radian International, Tucker, GA (United States); Noblett, J. [Radian International, Austin, TX (United States); Slatsky, M. [Southern Company, Birmingham, AL (United States)

    1999-08-01

    Artificial intelligence (AI)-based software packages which can optimize power plant operations that improves heat rate and also reduces nitrogen oxide emissions are now commonly available for commercial use. This paper discusses the implementation of the AI-based NOx and Heat Rate Optimization System at Ontario Hydro`s generation stations, emphasizing the current AI Optimization Project at Units 5 and 6 of the Lakeview Generating Station. These demonstration programs are showing promising results in NOx reduction and plant performance improvement. The availability of the plant Digital Control System (DCS) in implementing AI optimization in a closed-loop system was shown to be an important criterion for success. Implementation of AI technology at other Ontario Hydro fossil generating units as part of the overall NOx emission reduction system is envisaged to coincide with the retrofit of the original plant control system with the latest DCS systems. 14 refs., 3 figs.

  20. trans-11 18:1 Vaccenic Acid (TVA Has a Direct Anti-Carcinogenic Effect on MCF-7 Human Mammary Adenocarcinoma Cells

    Directory of Open Access Journals (Sweden)

    Ji-Na Lim

    2014-02-01

    Full Text Available Trans vaccenic acid (TVA; trans-11 18:1 is a positional and geometric isomer of oleic acid and it is the predominant trans isomer found in ruminant fats. TVA can be converted into cis-9, trans-11 conjugated linoleic acid (c9, t11-CLA, a CLA isomer that has many beneficial effects, by stearoyl CoA desaturase 1 (SCD1 in the mammary gland. The health benefits associated with CLA are well documented, but it is unclear whether trans fatty acids (TFAs from ruminant products have healthy effects. Therefore, the effects of TVA on the proliferation of MCF-7 human breast adenocarcinoma cells and MCF-10A human breast epithelial cells were investigated in the present study. Results showed that TVA inhibited the proliferation of MCF-7 cells but not MCF-10A cells by down-regulating the expression of Bcl-2 as well as procaspase-9. In addition, the suppressive effect of TVA was confirmed in SCD1-depleted MCF-7 cells. Our results suggested that TVA exerts a direct anti-carcinogenic effect on MCF-7 cells. These findings provided a better understanding of the research on the anti-carcinogenic effects of TVA and this may facilitate the manufacture of TVA/c9, t11-CLA fortified ruminant products.

  1. Small hydro

    International Nuclear Information System (INIS)

    Bennett, K.; Tung, T.

    1995-01-01

    A small hydro plant in Canada is defined as any project between 1 MW and 15 MW but the international standard is 10 MW. The global market for small hydro development was considered good. There are some 1000 to 2000 MW of generating capacity being added each year. In Canada, growth potential is considered small, primarily in remote areas, but significant growth is anticipated in Eastern Europe, Africa and Asia. Canada with its expertise in engineering, manufacturing and development is considered to have a good chance to take advantage of these growing markets

  2. Innovative private micro-hydro power development in Rwanda

    International Nuclear Information System (INIS)

    Pigaht, Maurice; Plas, Robert J. van der

    2009-01-01

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (i) institutional arrangements rather than technical quality determine the success of such projects; (ii) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (iii) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too.

  3. Home and away with Norwegian hydro

    International Nuclear Information System (INIS)

    Jones, Simon

    2000-01-01

    Evidence of Norway's position as a world leader in terms of design and construction of hydroelectric power plant, and its position as the biggest producer of hydro in Europe, is presented. There is still some 30 TWh of hydro available for development in Norway. Statkraft is the country's biggest hydro generator: it owns and operates 54 hydro plants and has shares in a further 30. Statkraft's research has shown that there is still a large market for renewables in Europe and believes that householders are prepared to pay a premium for green energy. Statkraft trades energy with Denmark and Sweden and is believed to be planning further growth overseas. The new millennium is set to bring major changes in Norway's power industry: Hafslund and Elkem have already agreed to merge to create the country's biggest privately-owned power group

  4. Hydro turbines: An introduction

    International Nuclear Information System (INIS)

    Gordon, J.L.

    1993-01-01

    The various types of hydraulic turbines currently used in hydroelectric power plants are described. The descriptions are intended for use by non-engineers who are concerned with fish passage and fish mortality at a hydro power facility. Terminology used in the hydro industry is explained. Since the extent of cavitation is one of the factors affecting mortality rates of fish passing through hydraulic turbines, an equation is introduced which measures the extent of cavitation likely to be experienced in a turbine. An example of how the cavitation index can be calculated is provided for two typical power plants. The relation between certain parameters of power plant operation and the extent of cavitation, and therefore of fish mortality, is illustrated. 2 refs., 14 figs

  5. Campbell Creek TVA 2010 First Year Performance Report July 1, 2009 August 31, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Christian, Jeffrey E [ORNL; Gehl, Anthony C [ORNL; Boudreaux, Philip R [ORNL; New, Joshua Ryan [ORNL

    2010-10-01

    This research project was initiated by TVA in March 2008 and encompasses three houses that are of similar size, design and located within the same community - Campbell Creek, Farragut TN with simulated occupancy. This report covers the performance period from July 1, 2009 to August 31, 2010. It is the intent of TVA that this Valley Data will inform electric utilities future residential retrofit incentive program.

  6. Short-term optimization of the new Avce pumping plant and three existing hydro power plants on the Soca river in Slovenia

    International Nuclear Information System (INIS)

    Bregar, Zvonko

    2007-01-01

    In the following years a new pumping plant Avce is going to join the existing cascade of three small-regulating-basin hydro power plants (HPPs) on the Soca river in Slovenia. The pumping plant operation will have to be synchronous to the operation of existing plants and vice versa since all four plants depend upon the same inflow and since they all belong to the same generation company that buys and sells electricity to a day-ahead electricity market. The Soca river has torrent alpine characteristics so there are doubts about the operation of the system in frequent dry seasons. As shown in this article, such questions can be effectively solved by first presenting the hydro system of four HPPs under study as a directed graph and then as a mixed integer linear program (MILP): a set of equations and inequations modeling technical issues of HPPs and a target function (the day-ahead market price) modeling the electricity market. A small and simple MILP model called Flores has been used for this study. The MILP approach requires only to specify the problem since the solution is found by using available commercial computer solvers. It can be applied on-line and it can be augmented to include also the transmission constraints, ancillary services, etc. (author)

  7. Short-term optimization of the new Avce pumping plant and three existing hydro power plants on the Soca river in Slovenia

    Energy Technology Data Exchange (ETDEWEB)

    Bregar, Zvonko [Milan Vidmar Electric Power Research Institute, Hajdrihova 2, SI-1000 Ljubljana (Slovenia)

    2007-08-15

    In the following years a new pumping plant Avce is going to join the existing cascade of three small-regulating-basin hydro power plants (HPPs) on the Soca river in Slovenia. The pumping plant operation will have to be synchronous to the operation of existing plants and vice versa since all four plants depend upon the same inflow and since they all belong to the same generation company that buys and sells electricity to a day-ahead electricity market. The Soca river has torrent alpine characteristics so there are doubts about the operation of the system in frequent dry seasons. As shown in this article, such questions can be effectively solved by first presenting the hydro system of four HPPs under study as a directed graph and then as a mixed integer linear program (MILP): a set of equations and inequations modeling technical issues of HPPs and a target function (the day-ahead market price) modeling the electricity market. A small and simple MILP model called Flores has been used for this study. The MILP approach requires only to specify the problem since the solution is found by using available commercial computer solvers. It can be applied on-line and it can be augmented to include also the transmission constraints, ancillary services, etc. (author)

  8. Innovative private micro-hydro power development in Rwanda

    Energy Technology Data Exchange (ETDEWEB)

    Pigaht, Maurice; Van der Plas, Robert J. [MARGE-Netherlands, Brem 68, 7577 EW Oldenzaal (Netherlands)

    2009-11-15

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (1) institutional arrangements rather than technical quality determine the success of such projects; (2) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (3) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too. (author)

  9. Economically viable and environment-friendly hydro energy in Estonia

    International Nuclear Information System (INIS)

    Saks, Ants; Velner, Harald

    2001-01-01

    Hydro energy has been in oblivion in Estonia for about 30 years now. During the 1960s, most of Estonia's small hydropower plants were closed down, just as it was done in the whole Soviet Union. As the only larger hydro plant, the 125 MW plant in Narva, was situated on the Russian side of the Narva River, there were only two or three small hydro plants left. Even those were exploited at low capacity and mainly for heating the buildings. It was not until the 1990s that a number of enthusiasts started to re-establish the hydro plants by reconstructing old installations. The pre-feasibility study 'Hydropower in Estonia' proposed by Estonian and Swedish experts, showed that the restoration of the hydropower plants and watermills is economically feasible and technically possible if advanced technology is used. Hydropower as an alternative ('green') energy source should be used in the best technical-economical way. The first pilot plant in Estonia, the 200 kW Kamari plant was constructed in 1998 with compact-propeller units, in co-operation with Waterpumps WP Oy and ABB. Today, ten new plants have been constructed or are under construction. Hydropower plants/watermills should be reconstructed in accordance with the legislative acts on environment protection

  10. Evaluating a biomass resource: The TVA region-wide biomass resource assessment model

    International Nuclear Information System (INIS)

    Downing, M.; Graham, R.L.

    1993-01-01

    Wood is an alterative fuel for electric power generation at coal-fired plants in the Tennessee Valley Authority (TVA) region. Short rotation wood energy crops (SRWC) could provide a source of this woody biomass. However, the economic and supply structures of SRWC markets have not been established. Establishing the likely price and supply of SRWC biomass in a region is a complex task because biomass is not an established commodity as are oil, natural gas and coal. In this study we project the cost and supply of short-rotation woody biomass for the TVA region -- a 276 county area that includes all of Tennessee and portions of 10 contiguous states in the southeastern United States. Projected prices and quantities of SRWC are assumed to be a function of the amount and quality of crop and pasture land available in a region. expected SRWC yields and production costs on differing soils and land types, and the profit that could be obtained from current conventional crop production on these same lands. Results include the supply curve of SRWC biomass that is projected to be available from the entire region, the amount and location of crop and pasture land that would be used, and the conventional agricultural crops that would be displaced as a function of SRWC production. Finally, we show the results of sensitivity analysis on the projected cost and supply of SRWC biomass. In particular, we examine the separate impacts of varying SRWC production yields

  11. The dual hydro x nuclear power plants

    International Nuclear Information System (INIS)

    Borges, J.C.

    1984-01-01

    An our daily life in modern society becomes more and more dependent on electricity, supply of this kind of energy should not only be a part of a global energy policy, but also lay down rigorous criteria to garanty the market supply. Planning actions of the electrical sector are more sensitive to unforseen events, either to brief interruptions in energy supply or to non-equilibrium at any time of the excess of supply over demand. In this way, the cost factor although basic, does not lead to optimal solutions in decisions which involve options between different technologies and energy sources to generate electricity. In this paper, we analyse the above situation in the case of deciding between utilization of nuclear or hydro power plants to supply the Brazilian demande for electricity. Our final objective was the search for parameters which could lead us to better identify and understand the adroitness and mistakes of the Brazilian Nuclear Program. (Author) [pt

  12. Međuovisnost industrijalizacije i nekih oblika socijalne mobilnosti stanovništva u sisačkom i petrinjskom kraju

    Directory of Open Access Journals (Sweden)

    Zdenko Braičić

    2012-01-01

    Full Text Available U prvom dijelu rada analiziraju se odabrani oblici socijalne mobilnosti stanovništva sisačkog i petrinjskog kraja između 1961. i 2001. godine: industrijska zaposlenost, deagrarizacija i razina obrazovanosti stanovništva. Potom se istražuje međuovisnost zaposlenosti stanovništva u industriji i drugih dvaju oblika socijalne mobilnosti. U tu svrhu izračunati su statistički pokazatelji jakosti veza između navedenih pojava (koeficijent jednostavne linearne korelacije. Rezultati su uputili na postojanje slabe pozitivne korelacije između industrijske zaposlenosti i deagrarizacije u sisačkom kraju, odnosno na srednje jaku korelaciju u petrinjskom kraju. Nešto jača korelacija ustanovljena je između industrijske zaposlenosti i obrazovanosti stanovništva.

  13. 'Matka 2' Hydroelectric Power Plant slip in the chain hydro energetic objects of the Treska River

    International Nuclear Information System (INIS)

    Danevski, Stavre

    2004-01-01

    The paper deals with the project for rational use of the Treska River. The concept of this project is utilization of the hydro-power potential of the Treska River through the subsystem 'Kozjak-Matka' which encompasses realization of three cascade hydroelectric power plants. The proposed and accepted design concepts of the machine hall and plant facilities in HPP 'St. Petka' (formerly named HPP Matka 2) are presented

  14. Determination of installation capacity in reservoir hydro-power plants considering technical, economical and reliability indices

    DEFF Research Database (Denmark)

    Hosseini, S.M.H.; Forouzbakhsh, Farshid; Fotouh-Firuzabad, Mahmood

    2008-01-01

    One of the most important issues in planning the ‘‘reservoir” type of hydro-power plants (HPP) is to determine the installation capacity of the HPPs and estimate its annual energy value. In this paper, a method is presented. A computer program has been developed to analyze energy calculation...

  15. Brigham City Hydro Generation Project

    Energy Technology Data Exchange (ETDEWEB)

    Ammons, Tom B. [Energy Conservation Specialist, Port Ewen, NY (United States)

    2015-10-31

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and

  16. Modeling invasive alien plant species in river systems: Interaction with native ecosystem engineers and effects on hydro-morphodynamic processes

    Science.gov (United States)

    van Oorschot, M.; Kleinhans, M. G.; Geerling, G. W.; Egger, G.; Leuven, R. S. E. W.; Middelkoop, H.

    2017-08-01

    Invasive alien plant species negatively impact native plant communities by out-competing species or changing abiotic and biotic conditions in their introduced range. River systems are especially vulnerable to biological invasions, because waterways can function as invasion corridors. Understanding interactions of invasive and native species and their combined effects on river dynamics is essential for developing cost-effective management strategies. However, numerical models for simulating long-term effects of these processes are lacking. This paper investigates how an invasive alien plant species affects native riparian vegetation and hydro-morphodynamics. A morphodynamic model has been coupled to a dynamic vegetation model that predicts establishment, growth and mortality of riparian trees. We introduced an invasive alien species with life-history traits based on Japanese Knotweed (Fallopia japonica), and investigated effects of low- and high propagule pressure on invasion speed, native vegetation and hydro-morphodynamic processes. Results show that high propagule pressure leads to a decline in native species cover due to competition and the creation of unfavorable native colonization sites. With low propagule pressure the invader facilitates native seedling survival by creating favorable hydro-morphodynamic conditions at colonization sites. With high invader abundance, water levels are raised and sediment transport is reduced during the growing season. In winter, when the above-ground invader biomass is gone, results are reversed and the floodplain is more prone to erosion. Invasion effects thus depend on seasonal above- and below ground dynamic vegetation properties and persistence of the invader, on the characteristics of native species it replaces, and the combined interactions with hydro-morphodynamics.

  17. Varnostni vidiki spletnega bančništva : diplomsko delo univerzitetnega študija

    OpenAIRE

    Prodanović, Stanislav

    2013-01-01

    Banke imajo, kot osrednje finančne institucije, veliko zaslug za hiter razvoj informacijske tehnologije. Če je bila še pred približno 15 leti tehnologija bank skrita pred očmi javnosti, je danes preko elektronskega bančništva povezana s komitenti bank, saj se je v zadnjem desetletju elektronsko bančništvo izkazalo za eno najbolj dobičkonosnih spletnih storitev. Spletno bančništvo je del elektronskega bančništva in omogoča opravljanje bančnih poslov preko interneta ob vseh urah dneva, hkrat...

  18. Determination and modeling of the influence of the fluid-dynamics in hydro-treating bench scale plants

    Energy Technology Data Exchange (ETDEWEB)

    Burkhardt, T.

    1999-09-16

    At an industrial scale, the hydro-treating of oil fractions is carried out in multiphase fixed bed reactors. The oil and hydrogen cross the catalyst bed, usually in co-current downflow. Since the product specifications are steadily becoming more severe, the testing of new catalysts and of modified operating conditions in pilot plants becomes increasingly important. Although these pilot plants are frequently by a factor of 100 000 smaller than the industrial units, they still have to allow the up-scaling to industrial units. In the literature relatively low conversion degrees in pilot plants are frequently reported, especially in downflow. The significantly lower fluid velocities in pilot plants seem to be responsible for such differences, as the influence of fluid-dynamic non-idealities and of the extra-particle mass transfer phenomena increases with a decrease of the fluid velocities. In the present work, the influence of important fluid-dynamic non-idealities on the hydro-treating of gas oil fractions in pilot plants was examined. This was done on the one hand in experiments with different pilot plants and on the other hand by simulations with an especially developed multiphase model. The phenomena were considered as well in an isolated manner. In order to examine any interactions with the chemical reactions, they were also studied in a reactive system. This methodology was applied to the phenomena, 'axial dispersion'and 'gas-liquid mass transfer'. (author)

  19. The hydro digest

    Energy Technology Data Exchange (ETDEWEB)

    Scheil, Hermann [Itaipu Mondig, Power Generation Group (KWU), Siemens AG, Erlangen (Germany)

    2000-12-01

    Digest WK is an analysis and diagnostics system for turbine generators in large hydroelectric plant: it was developed from the Digest system which has been used in steam turbine plants for many years. The system is in use at the world's biggest hydro plant in Itaipu Binacional between Paraguay and Brazil. The system is described under the sub-headings of (a) monitoring concept; (b) the Digest WK system; (c) vibration monitoring; (d) generator temperature analysis and (e) outlook.

  20. Small hydro plant- present scenario and future prospects

    International Nuclear Information System (INIS)

    Purohit, D.P.

    1996-01-01

    The article, deals with the methodology of power generation by small hydro power resources, especially in the Himalayan and sub Himalayan regions and the benefits it will bestow to the inhabitants of this region. The development of small hydro power projects in the Himalayas and sub Himalayas would serve as a model for environment- friendly sources of energy to benefit small communities world wide. The use of water turbine generators for the generation of cheaper power is also discussed. 4 refs

  1. Theory of Visual Attention (TVA) applied to mice in the 5-choice serial reaction time task

    DEFF Research Database (Denmark)

    Fitzpatrick, C. M.; Caballero-Puntiverio, M.; Gether, U.

    2017-01-01

    Rationale The 5-choice serial reaction time task (5-CSRTT) is widely used to measure rodent attentional functions. In humans, many attention studies in healthy and clinical populations have used testing based on Bundesen’s Theory of Visual Attention (TVA) to estimate visual processing speeds...... on an individual level. Scopolamine HBr dose-dependently reduced 5-CSRTT attentional performance while also increasing reward collection latency at the highest dose. Upon TVA modelling, scopolamine HBr significantly reduced visual processing speed at both doses, while having less pronounced effects on visual...... modelled using a new three-parameter version of TVA to obtain estimates of visual processing speeds, visual thresholds and motor response baselines in each mouse. Results The parameter estimates for each animal were reliable across sessions, showing that the data were stable enough to support analysis...

  2. Energy supply technologies. Hydro, ocean, wave and tidal

    Energy Technology Data Exchange (ETDEWEB)

    Fenhann, J.; Larsen, Hans [Risoe National Lab. - DTU (Denmark)

    2007-11-15

    This chapter presents an overview of current hydro, ocean, wave and tidal initiatives. Large hydro remains one of the lowest-cost generating technologies, although environmental constraints, resettlement impacts and the limited availability of sites have restricted further growth in many countries. Large hydro supplied 16 % of global electricity in 2004, down from 19 % a decade ago. Large hydro capacity totalled about 720 GW worldwide in 2004 and has grown historically at slightly more than 2 % annually. China installed nearly 8 GW of large hydro in 2004, taking the country to number one in terms of installed capacity (74 GW). With the completion of the Three Gorges Dam, China will add some 18.2 GW of hydro capacity in 2009. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic cost of hydro includes displacements and submergence. Further hydro can improve peak-capacity management. Ocean currents, some of which runs close to European coasts, carry a lot of kinetic energy. Part of this energy can be captured by sub-marine windmills and converted into electricity. These are more compact than the wind turbines used on land, simply because water is much denser than air. The main European countries with useful current power potential are France and the UK. Ocean tides are driven by the gravitational pull of the moon. With one high tide every 12 hours, a tidal power plant can operate for only four or five hours per cycle, so power from a single plant is intermittent. A suitably-designed tidal plant can, however, operate as a pimped storage system, using electricity during periods of low demand to store energy that can be recovered later. The only large, modern example of a tidal power plant is the 240 MW La Rance plant, built in France in the 1960s, which represents 91 % of the world tidal power capacity. Wave energy can be seen as

  3. Conceptual design of planetary gearbox system for constant generator speed in hydro power plant

    Directory of Open Access Journals (Sweden)

    Bhargav

    2018-01-01

    Full Text Available Micro Hydro Power Plant (MHPP is emerging as one of the most clean, renewable and reliable energy technology for harnessing power. In MHPP hydro governors are avoided, that results in turbine speed fluctuation. MHPP requires either speed or torque amplification of generator for constant power generation. To achieve this, planetary gear transmission system is explored for MHPP due to its higher efficiency and compact size. A conceptual planetary gearbox system is developed for MHPP to maintain constant generator speed. The conceptual gearbox is designed, modelled and analysed using ADAMS software. Simulation results are found to be in close agreement with analytical results. Hence, conceptual design of planetary gearbox can be used to govern constant generator speed. In this paper, a MHPP which generate constant power of 5 kW at constant generator speed of 1490 rpm is analysed and validated

  4. Theory of Visual Attention (TVA) applied to mice in the 5-choice serial reaction time task.

    Science.gov (United States)

    Fitzpatrick, C M; Caballero-Puntiverio, M; Gether, U; Habekost, T; Bundesen, C; Vangkilde, S; Woldbye, D P D; Andreasen, J T; Petersen, A

    2017-03-01

    The 5-choice serial reaction time task (5-CSRTT) is widely used to measure rodent attentional functions. In humans, many attention studies in healthy and clinical populations have used testing based on Bundesen's Theory of Visual Attention (TVA) to estimate visual processing speeds and other parameters of attentional capacity. We aimed to bridge these research fields by modifying the 5-CSRTT's design and by mathematically modelling data to derive attentional parameters analogous to human TVA-based measures. C57BL/6 mice were tested in two 1-h sessions on consecutive days with a version of the 5-CSRTT where stimulus duration (SD) probe length was varied based on information from previous TVA studies. Thereafter, a scopolamine hydrobromide (HBr; 0.125 or 0.25 mg/kg) pharmacological challenge was undertaken, using a Latin square design. Mean score values were modelled using a new three-parameter version of TVA to obtain estimates of visual processing speeds, visual thresholds and motor response baselines in each mouse. The parameter estimates for each animal were reliable across sessions, showing that the data were stable enough to support analysis on an individual level. Scopolamine HBr dose-dependently reduced 5-CSRTT attentional performance while also increasing reward collection latency at the highest dose. Upon TVA modelling, scopolamine HBr significantly reduced visual processing speed at both doses, while having less pronounced effects on visual thresholds and motor response baselines. This study shows for the first time how 5-CSRTT performance in mice can be mathematically modelled to yield estimates of attentional capacity that are directly comparable to estimates from human studies.

  5. Operating experiences with Neutron Overpower Trip Systems in Ontario Hydro's CANDU nuclear plants

    International Nuclear Information System (INIS)

    Hnik, J.; Kozak, J.

    1991-01-01

    Operating experiences with Neutron Over Power Trip (NOP) Systems in different Ontario Hydro CANDU nuclear power plants are discussed. Lessons learned from the system operation and their impact on design improvements are presented. Retrofitting of additional tools, such as Shutdown System Monitoring computers, to improve operator interaction with the system is described. Experiences with the reliability of some of the NOP system components is also discussed. Options for future enhancements of system performance and operability are identified. (author)

  6. Pumping station design for a pumped-storage wind-hydro power plant

    International Nuclear Information System (INIS)

    Anagnostopoulos, John S.; Papantonis, Dimitris E.

    2007-01-01

    This work presents a numerical study of the optimum sizing and design of a pumping station unit in a hybrid wind-hydro plant. The standard design that consists of a number of identical pumps operating in parallel is examined in comparison with two other configurations, using one variable-speed pump or an additional set of smaller jockey pumps. The aim is to reduce the amount of the wind generated energy that cannot be transformed to hydraulic energy due to power operation limits of the pumps and the resulting step-wise operation of the pumping station. The plant operation for a period of one year is simulated by a comprehensive evaluation algorithm, which also performs a detailed economic analysis of the plant using dynamic evaluation methods. A preliminary study of the entire plant sizing is carried out at first using an optimization tool based on evolutionary algorithms. The performance of the three examined pumping station units is then computed and analyzed in a comparative study. The results reveal that the use of a variable-speed pump constitutes the most effective and profitable solution, and its superiority is more pronounced for less dispersed wind power potential

  7. TVA experience in BWR reload design and licensing

    International Nuclear Information System (INIS)

    Robertson, J.D.

    1986-01-01

    TVA has developed and implemented the capability to perform BWR reload core design and licensing analyses. The advantages accruing from this capability include the tangible cost-savings from performing reload analyses in-house. Also, ''intangible'' benefits such as increased operating flexibility and the ability to accommodate multivendor fuel designs have been demonstrated. The major disadvantage with performing in-house analyses is the cost associated with development and maintenance of the analytical methods and staff expertise

  8. Feasibility study of VLH hydro turbine installation at Nam Pung hydropower plant, Thailand

    Directory of Open Access Journals (Sweden)

    Weerapon Nuantong

    2016-10-01

    Full Text Available The aim of this research was to study the feasibility of installing a Very Low Head (VLH hydro turbine at downstream of the Nam Pung hydropower plant by increasing the potential of renewable energy sources for the Electricity Generating Authority of Thailand (EGAT. Due to the constraints of the local site, the water head level was limited to less than 2 meters and the flow rate to below 5 m3/ s. The hydro turbine selected was an axial flow turbine with performance of 86.4%. The outcome of the power output was 84.61 kW. Investment analysis was subsequently applied to estimate feasibility of the project using engineering economics. The analyses of results have shown that the project is worthwhile in terms of an investment decision. The payback period of actual price was 0.83 and 0.88 years and general price case of 3.68 and 4.04 years, along with an interest rate of 6.75% and 12.625% respectively. Projected project lifespan is 25 years.

  9. Hydro adventurers

    International Nuclear Information System (INIS)

    Wood, Janet

    2000-01-01

    Some of the changes brought about by privatisation of the hydroelectric power industry in Ecuador are discussed. At present, about 25% of the population has no electricity supply; in the remaining areas demand is increasing. Seven new facilities are presently under discussion and these are described briefly. A plant at Abitugua is to be developed as a 'merchant plant' and the meaning and implications of this are described in detail. The present financing programme for Abituaga and an alternative financing programme are detailed. By 2010, some 40% of Ecuador's electricity is expected to come from hydro

  10. Optimal hydro scheduling and offering strategies considering price uncertainty and risk management

    International Nuclear Information System (INIS)

    Catalão, J.P.S.; Pousinho, H.M.I.; Contreras, J.

    2012-01-01

    Hydro energy represents a priority in the energy policy of Portugal, with the aim of decreasing the dependence on fossil fuels. In this context, optimal hydro scheduling acquires added significance in moving towards a sustainable environment. A mixed-integer nonlinear programming approach is considered to enable optimal hydro scheduling for the short-term time horizon, including the effect of head on power production, start-up costs related to the units, multiple regions of operation, and constraints on discharge variation. As new contributions to the field, market uncertainty is introduced in the model via price scenarios and risk management is included using Conditional Value-at-Risk to limit profit volatility. Moreover, plant scheduling and pool offering by the hydro power producer are simultaneously considered to solve a realistic cascaded hydro system. -- Highlights: ► A mixed-integer nonlinear programming approach is considered for optimal hydro scheduling. ► Market uncertainty is introduced in the model via price scenarios. ► Risk management is included using conditional value-at-risk. ► Plant scheduling and pool offering by the hydro power producer are simultaneously considered. ► A realistic cascaded hydro system is solved.

  11. The power of commitment : Newfoundland and Labrador Hydro 2000 annual report

    International Nuclear Information System (INIS)

    2000-01-01

    A consolidated review of the operations of Newfoundland and Labrador Hydro (Hydro) was presented with particular focus on energy production, energy sales, the Avalon Transmission upgrade, development of the Granite Canal and Hydro's dam safety program. Hydro reported a 4.5 per cent increase in gross energy production at their generating plants throughout the system. Production from hydro sources also increased by 4.5 per cent to a total of 5,032 GWh. Thermal production from the Holyrood generating facility also increased slightly to 1,040 GWh. Production for peaking and emergency requirements from gas turbines and diesel plants dropped to 0.6 GWh. In 2000, about 83 per cent of all the energy supplied to their customers came from hydro sources. Total energy sales were up 4.6 per cent during 2000. This annual report presented the company's financial performance, executive changes, rural rate inquiry, and reorganization. Financial statements included a thorough review and analysis of financial transactions, the auditor's report, and the customary notes to the consolidated financial statement including balance sheets, assets, liabilities and capital. tabs., figs

  12. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    International Nuclear Information System (INIS)

    Druce, D.

    2004-01-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs

  13. Hydro-Quebec's buyback tariff

    International Nuclear Information System (INIS)

    Richard, J.C.

    1992-01-01

    Hydro-Quebec had an installed electric generation capacity of 25,682 MW in 1990, of which 23,927 MW was hydraulic. Of the 26 thermal power plants, 22 are in remote communities on islands or in the north part of the province. The utility's development plan predicts an annual growth in demand of 2.6% to reach ca 200 TWh in 2006; this demand would be reduced to ca 180 TWh by energy efficiency measures. To increase capacity, Hydro-Quebec can utilize the hydro generation potential of its large rivers, of which 18,000 MW is economically viable, and its small rivers. Of the 10,000 MW theoretical potential of the latter, a large fraction cannot be economically developed under existing conditions. The utility has a policy to purchase energy as a function of the price of fossil fuel. For wind energy, this price was 4.22 cents/kWh in 1991; this price will be increased annually according to the inflation index. In its isolated sites such as the Magdalen Islands, current costs of diesel-generated electricity are at least 5.5 cents/kWh. There are possibilities for installing wind plants in isolated regions but their automatic control systems need to be improved for achieving a larger utilization factor relative to diesel generation and their cost needs to be reduced. 1 tab

  14. Neural markers of individual and age differences in TVA attention capacity parameters

    DEFF Research Database (Denmark)

    Wiegand, Iris

    2013-01-01

    The ‘Theory of Visual Attention’ quantifies an interindividual’s capacity of attentional resources in parameters visual processing speed C and vSTM storage capacity K. Distinct neural markers of interindividual differences in these functions were identified by combining TVA-based assessment...

  15. OVERVIEW OF A NEW METHOD FOR DESIGNING HIGH EFFICIENCY SMALL HYDRO POWER PLANTS

    Directory of Open Access Journals (Sweden)

    Milun Babić

    2010-01-01

    Full Text Available Significant number of research projects in the area of renewable energy sources (especially for small hydro power plants has been made within the Department for Energy and Process Engineering and Regional Euro Energy Efficiency Center at Faculty of Mechanical Engineering (University of Kragujevac, Serbia since early eighties. The results are various; numerous domestic and international recognition and technical performance tell about the success of the research. Research projects have been following the technical and technological development of research equipment and economy growth. This has led to the development of software for designing turbines of SHP plants. In order to notify the public about possibilities of our software, in this paper is briefly described a mathematical model and procedures for calculating and designing of SHPP for known conditions. As an argument for assessing the validity and potential of our research results is shown constructed SHP plant "Bosnia 1", 2 x 100 kW power.

  16. Role of Pumped Storage Hydro Resources in Electricity Markets and System Operation: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Ela, E.; Kirby, B.; Botterud, A.; Milostan, C.; Krad, I.; Koritarov, V.

    2013-05-01

    The most common form of utility- sized energy storage system is the pumped storage hydro system. Originally, these types of storage systems were economically viable simply because they displace more expensive generating units. However, over time, as those expensive units became more efficient and costs declined, pumped hydro storage units no longer have the operational edge. As a result, in the current electricity market environment, pumped storage hydro plants are struggling. To offset this phenomenon, certain market modifications should be addressed. This paper will introduce some of the challenges faced by pumped storage hydro plants in today's markets and purpose some solutions to those problems.

  17. Hydro power plants, an overview of the current types and technology

    Directory of Open Access Journals (Sweden)

    Tkáč Štefan

    2018-03-01

    Full Text Available Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  18. Hydro power plants, an overview of the current types and technology

    Science.gov (United States)

    Tkáč, Štefan

    2018-03-01

    Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  19. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  20. Retrofitting the small-scale hydro power plant 'La Chocolatiere' in Echandens-Bussigny, Switzerland

    International Nuclear Information System (INIS)

    2008-05-01

    This report for the Swiss Federal Office of Energy (SFOE) is a project study for the retrofitting of a small-scale hydro power plant installed on the River Venoge, between the communities of Echandens and Bussigny, western Switzerland. At this site, hydro power is used since the 18 th century. A permanent license to use at most 3 m 3 /s is available. The study concludes that the maximum flow rate of 6 m 3 /s would be more advantageous, implying a 35 cm higher dam on the river. Two turbines could then be installed, leading to the maximum electric power of 177 kW and the power production of 727,000 kWh/y. From the detailed inventory of the retrofitting work and the installation of the new turbines - including a new fish ladder according to the legislation in force - the authors conclude that electricity could be generated at a cost amounting to about CHF 0.24/kWh. It is recommended to request the modification of the water use license in order to be able to use up to 6 m 3 /s.

  1. Demystification and localization in the adoption of micro-hydro technology : Insights from India

    NARCIS (Netherlands)

    Höffken, J.I.

    2016-01-01

    The phrase ‘small is beautiful’ holds true for the micro-hydro plants discussed in this article. Micro-hydro plants can convert the energy of falling water into electricity. In India, access to electricity cannot be taken for granted, especially in rural areas, which do not yet have grid extension

  2. Development and applications of reactor noise analysis at Ontario Hydro`s CANDU reactors

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckler, O [Ontario Hydro, Toronto, ON (Canada); Tulett, M V [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1996-12-31

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro`s CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  3. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    OpenAIRE

    Febijanto, Irhan

    2013-01-01

    Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from ...

  4. Economic impact of Hydro-Quebec's nuclear activities

    International Nuclear Information System (INIS)

    Emard, R.

    1994-01-01

    Gentilly 2 nuclear power plant has benefited the regions of Becancour and Trois Rivieres, with spin-off at the provincial level. Gentilly 2 is Hydro Quebec's only nuclear plant. Its 675 MW provide nearly 3% of Hydro Quebec's production. Over 664 permanent jobs were created, 70% of them highly specialized and multi-skilled. In 1993, out of C$99 spent, 57.3 were for wages, 16.3 for equipment and supplies (including fuel and heavy water), 18 for professional services provided by AECL and others, and the remainder included fees, permits, contract work, and miscellaneous. Gentilly 2 has fostered technological development and inventions which are used at other CANDU stations. 7 ills

  5. 76 FR 53994 - Final Environmental Impact Statement, Single Nuclear Unit at the Bellefonte Plant Site, Jackson...

    Science.gov (United States)

    2011-08-30

    ... limited to, wind, solar, natural and methane gas, hydroelectric, and lignite coal. TVA also purchases... even with substantial energy replacement through conservation measures, TVA must still add new base... plant species have been previously reported to verify if the rare species are still present in the...

  6. The Nothuesli small hydro project

    International Nuclear Information System (INIS)

    Balachandran, S.; Jorde, K.

    2008-01-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  7. Competition policy and regulation in hydro-dominated electricity markets

    International Nuclear Information System (INIS)

    Rangel, Luiz Fernando

    2008-01-01

    This paper discusses the main competition issues that arise in electricity systems dominated by hydro generation, arguing that technological differences between hydro and thermal plants may allow hydropower producers to exert market power in different and subtler ways compared to thermal generators. The key for market power in hydro-based systems is the strategic allocation of a given amount of output across periods, rather than a straightforward reduction of total output. The paper examines the interaction between strategic hydro reservoir operation and transmission capacity constraints, and summarizes the implications of market power for system reliability. A review of recent relevant literature is included. Finally, possible interventions to mitigate market power are analysed

  8. Testing of mobile surveillance robot at a nuclear power plant

    International Nuclear Information System (INIS)

    White, J.R.; Harvey, H.W.; Farnstrom, K.A.

    1987-01-01

    In-plant testing of a mobile surveillance robot (SURBOT) was performed at the Browns Ferry Nuclear Plant by TVA personnel. The results verified that SURBOT can be used for remote surveillance in 54 separate controlled radiation rooms at the plant. High-quality color video, audio, and other data are collected, digitized by an on-board computer, and transmitted through a cable to the control console for real-time display and videotaping. TVA projects that the use of SURBOT for surveillance during plant operation will produce annual savings of about 100 person-rem radiation exposure and $200,000 in operating costs. Based on the successful results of this program, REMOTEC is now commercializing the SURBOT technology on both wheeled and tracked mobile robots for use in nuclear power plants and other hazardous environments

  9. Vibration analysis of a hydro generator for different operating regimes

    Science.gov (United States)

    Haţiegan, C.; Pădureanu, I.; Jurcu, M.; Nedeloni, M. D.; Hamat, C. O.; Chioncel, C. P.; Trocaru, S.; Vasile, O.; Bădescu, O.; Micliuc, D.; (Filip Nedeloni, L.; Băra, A.; (Barboni Haţiegan, L.

    2017-01-01

    Based on experimental measurements, this paper presents the vibration analysis of a hydro generator that equips a Kaplan hydraulic turbine of a Hydropower plant in Romania. This analysis means vibrations measurement to different operating regimes of the hydro generator respectively before installing it and into operation, namely putting off load mode (unexcited and excited) respectively putting on load mode. By comparing, through the experimental results obtained before and after the operation of hydro aggregates are observed vibrations improvements.

  10. Effect of turbine materials on power generation efficiency from free water vortex hydro power plant

    International Nuclear Information System (INIS)

    Sritram, P; Treedet, W; Suntivarakorn, R

    2015-01-01

    The objective of this research was to study the effect of turbine materials on power generation efficiency from the water free vortex hydro power plant made of steel and aluminium. These turbines consisted of five blades and were twisted with angles along the height of water. These blades were the maximum width of 45 cm. and height of 32 cm. These turbines were made and experimented for the water free vortex hydro power plant in the laboratory with the water flow rate of 0.68, 1.33, 1.61, 2.31, 2.96 and 3.63 m 3 /min and an electrical load of 20, 40, 60, 80 and 100 W respectively. The experimental results were calculated to find out the torque, electric power, and electricity production efficiency. From the experiment, the results showed that the maximum power generation efficiency of steel and aluminium turbine were 33.56% and 34.79% respectively. From the result at the maximum water flow rate of 3.63 m 3 /min, it was found that the torque value and electricity production efficiency of aluminium turbine was higher than that of steel turbine at the average of 8.4% and 8.14%, respectively. This result showed that light weight of water turbine can increase the torque and power generation efficiency. (paper)

  11. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  12. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Druce, D. [British Columbia Hydro, Vancouver, BC (Canada)

    2004-07-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs.

  13. Cost determination of the electro-mechanical equipment of a small hydro-power plant

    Energy Technology Data Exchange (ETDEWEB)

    Ogayar, B.; Vidal, P.G. [Grupo de Investigacion IDEA, Escuela Politecnica Superior, University of Jaen, Campus de Las Lagunillas, s/n. 23071-Jaen (Spain)

    2009-01-15

    One of the most important elements on the recovery of a small hydro-power plant is the electro-mechanical equipment (turbine-alternator), since the cost of the equipment means a high percentage of the total budget of the plant. The present paper intends to develop a series of equations which determine its cost from basic parameters such as power and net head. These calculations are focused at a level of previous study, so it will be necessary to carry out the engineering project and request a budget to companies specialized on the construction of electro-mechanical equipment to know its cost more accurately. Although there is a great diversity in the typology of turbines and alternators, data from manufacturers which cover all the considered range have been used. The above equations have been developed for the most common of turbines: Pelton, Francis, Kaplan and semiKaplan for a power range below 2 MW. The obtained equations have been validated with data from real installations which have been subject to analysis by engineering companies working on the assembly and design of small plants. (author)

  14. Feasibility study of a Green Power Plant. Final report. [Offshore pumped hydro storage

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-03-15

    This project is a technical evaluation and a feasibility study of a concept called the Green Power Plant (GPP), developed by Seahorn Energy Aps. The Green Power Plant is an offshore pumped hydro storage facility constructed from prefabricated elements and with integrated renewable energy production. Pumped hydro storage is a known technology with a proven roundtrip energy storage efficiency of 80%. The focus of the GPP project is on simplifying and industrializing the construction of the reservoir wall, thereby achieving a cost efficient solution. The reservoir structure is dependent on the site on which the reservoir is established, thus Kriegers Flak in the Baltic Sea has been chosen as basis for the technical evaluation. As soil conditions vary, the technical evaluations have been based on a general soil profile. A water depth of 25m has been chosen as basis for the evaluation. A reservoir with a diameter of 2 km has been evaluated as baseline scenario. Feasibility of the GPP was evaluated based on the cost and income estimates. For the baseline scenario an internal rate of return of 6.6% was found for a period of 35 years. A sensitivity analysis reveals internal rates of return over 35 years varying from 4.9% to 10.9%. Especially larger reservoir diameters increase profitability of the GPP. The results from this project will be utilized in raising funds for further development of the GPP concept. Seahorn Energy Aps aims at optimizing the wind turbine integration, the steel pile wall structure and the pump-turbine integration in a future project towards construction of a demonstration facility. (LN)

  15. Revitalizing the nuclear business at Ontario Hydro

    International Nuclear Information System (INIS)

    Talbot, K.

    1994-01-01

    Ontario Hydro, North America's largest electric power utility, with an installed capacity of 34,000 MW, has under gone a major restructuring over the past year to better align itself with a changing electricity market and evolving customer needs. The single largest new business unit within the new Ontario Hydro is Ontario Hydro Nuclear (OHN), responsible for engineering, operation and maintenance of the Corporation's 20 large nuclear units at three generating sites, OHN faces a significant challenge in returning Ontario's nuclear units to the world-leading performance levels they enjoyed in the past, particularly the older Pickering A and Bruce A plants. However, steady progress is being made as evidenced by improving peer reviews and overall capacity and financial performance

  16. Integrity and life estimation of turbine runner cover in a hydro power plant

    Directory of Open Access Journals (Sweden)

    A. Sedmak

    2016-03-01

    Full Text Available This paper presents integrity and life estimation of turbine runner cover in a vertical pipe turbines, Kaplan 200 MW nominal output power, produced in Russia, and built in six hydro-generation units of hydroelectric power plant „Đerdap 1” in Serbia. Fatigue and corrosion-fatigue interaction have been taken into account using experimentally obtained material properties, as well as analytical and numerical calculations of stress state, to estimate appropriate safety factors. Fatigue crack growth rate, da/dN, was also calculated, indicated that internal defects of circular or elliptical shape, found out by ultrasonic testing, do not affect reliable operation of runner cover.

  17. Hydro power plants, an overview of the current types and technology

    OpenAIRE

    Tkáč Štefan

    2018-01-01

    Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy...

  18. A Risk Analysis of Small-Hydro Power (SHP Plants Investments

    Directory of Open Access Journals (Sweden)

    Jorge Cunha

    2014-06-01

    Full Text Available The increase in electricity consumption has led to a sharp increase in energy demand which rose environmental and sustainability concerns. To address this issue, there has been an incentive to resource to renewable energy sources for electricity production. Departing from a real case study, the investment appraisal of a SHP project under the present market conditions is described, followed by a sensitivity analysis in order to identify the main sources of risk. The main results obtained showed that in the context of a regulated tariff the project is worthwhile due to a positive NPV. However, if electricity had to be sold at market prices, the project becomes unprofitable. Theresults put also in evidence the vulnerability of the investment to an adverse change in interest rates. Future SHP plant investments should take into account the need to operate in a free market and to compete with technologies based on fossil fuels or large hydro.

  19. Canadian hydro potential in the North American market

    International Nuclear Information System (INIS)

    Adams, K.

    2002-01-01

    Canada's hydro potential in the North American energy market was discussed. Canada is a net exporter of electricity in North America, and since 1990, has exported an average of 28 Terawatt hours/year to the United States. More than 65 per cent of these exports were generated from hydro power plants. It was emphasized that significant reductions in greenhouse gases can be achieved if Canadian hydroelectricity is substituted for coal power generation. It was also noted that although there may not be enough hydro capacity to meet all of North America's energy requirements, development of new large hydro resources in Canada could help meet the growing demand for electricity in the United States. Hydro can also complement other renewable energy sources such as wind and solar. The factors that will determine if Canadian hydropower will contribute to the energy demand are market mechanisms such as greenhouse gas credit trading systems which provide incentive for renewable energy projects. In addition, the existing infrastructure must be expanded both east and west within Canada and north and south between Canada and the United States. 5 figs

  20. Multiple objective optimization of hydro-thermal systems using Ritz's method

    Directory of Open Access Journals (Sweden)

    Arnáu L. Bayón

    1999-01-01

    Full Text Available This paper examines the applicability of the Ritz method to multi-objective optimization of hydro-thermal systems. The algorithm proposed is aimed to minimize an objective functional that incorporates the cost of energy losses, the conventional fuel cost and the production of atmospheric emissions such as NO x and SO 2 caused by the operation of fossil-fueled thermal generation. The formulation includes a general layout of hydro-plants that may form multi-chains of reservoir network. Time-delays are included and the electric network is considered by using the active power balance equation. The volume of water discharge for each hydro-plant is a given constant amount from the optimization interval. The generic minimization algorithm, which is not difficult to construct on the basis of the Ritz method, has certain advantages in comparison with the conventional methods.

  1. Neuro-fuzzy modelling of hydro unit efficiency

    International Nuclear Information System (INIS)

    Iliev, Atanas; Fushtikj, Vangel

    2003-01-01

    This paper presents neuro-fuzzy method for modeling of the hydro unit efficiency. The proposed method uses the characteristics of the fuzzy systems as universal function approximates, as well the abilities of the neural networks to adopt the parameters of the membership's functions and rules in the consequent part of the developed fuzzy system. Developed method is practically applied for modeling of the efficiency of unit which will be installed in the hydro power plant Kozjak. Comparison of the performance of the derived neuro-fuzzy method with several classical polynomials models is also performed. (Author)

  2. Development of Dalaelven hydro power scheme in Sweden

    International Nuclear Information System (INIS)

    Kokko, Voitto; Hjerthen, Peter; Ingfaelt, Hans; Loewen, Karl-Erik; Sjoegren, Arne

    2015-01-01

    The Dalaelven hydro scheme is located in central Sweden. Fortum has in the scheme 50 dams and 35 hydro power plants producing 4 TWh energy with a capacity of 970 MW. The main reservoirs are Lake Siljan and Traengsletsjoen with Traengslet dam, the highest earth-filled dam in Sweden. Development of the hydro scheme started 1878 with construction of four power plants for industry until 1930. From 1931 to 1974 15 power plants were built for increasing electricity consumption. De-regulation of the energy market in 1990's and EU environmental targets in 2000's resulted in the rehabilitation of ten power plants between 1990 and 2014 with increased annual energy production of 377 GWh (29%) and capacity 124 MW (59%). This energy decreases the annual CO 2 emissions with 125918 tons in comparison to production of the same amount of energy by coal. In several cases the rehabilitation was made in new power houses, allowing the development of the layout and technology of civil structures, and use of state-of-art equipment. Sweden uses the green certificate system, and 235 GWh of the energy received this certificate. Other environmental benefits come from use of the environmentally friendly Kaplan turbines and construction of some new fish pass. There are further plans to increase the spillway capacity of Traengslet dam and to rehabilitate eight power plant units. The possibilities of obtaining the Environmental licences for the rehabilitations has became challenging in the past years and green certificates are nowadays agreed only for increased energy. (authors)

  3. 18 CFR 1304.407 - Development within flood control storage zones of TVA reservoirs.

    Science.gov (United States)

    2010-04-01

    ... flood control storage zones of TVA reservoirs. 1304.407 Section 1304.407 Conservation of Power and Water... documentation related to flood control storage, provided the loss of flood control storage caused by the project... control storage. If this determination can be made, the applicant must then demonstrate how the loss of...

  4. It's done... or the unmanned operation in hydro power plants

    International Nuclear Information System (INIS)

    Chudy, M.

    2009-01-01

    Looking back at the two years of activities performed while launching the individual Hydro Power Plants (HPP) of the Slovenske elektrarne, a.s. into the unmanned operation, there was 'quantum' of work done during the implementation of each new HPP in the area of group output regulation, substation management, failure and alarm record and evaluation system, technological and information service. It is a good feeling to see the results of the work - when it works. Someone could say that we just test the project at one HPP and the others just get implemented. The fact that the HPPs differ from each other brings its specifics, which needed to be handled individually in the SW or HW area, or in terms of communication. We should definitely mention the enthusiasm and helpfulness of the employees even at the cost of their free time spent in launching the power plants into unmanned operation. The reward for the hours spent dealing with the technical issues and revealing the shortcomings in the whole operation management process is today in the greater possibilities of gaining an overviews of the events in the operation of each HPP or TG generation unit. However, our hands are little less free to perform interventions in the control systems - time for the maintenance - necessary planning of the outages - coordination within the operation preparation. (author)

  5. A case study of small hydro and grid extension for rural electrification alternatives and complementarities

    International Nuclear Information System (INIS)

    Tebicke, H.L.; Mariam, H.G.

    1990-01-01

    This paper reports that rural electrification in Eastern and Southern African Countries (ESAC) has so far been based largely on stand-alone diesel electric generating plant or on the extension of high-voltage transmission grids fed by large hydro and/or thermal electric generating stations. The alternative of furnishing supply at modest investment and competitive cost from a nearby small- hydro plant has rarely been considered in those countries of the sub-region that have ample hydro-power resources. All countries in the sub-region (except Angola) import petroleum and/or petroleum product supplies, as well as all hardware for electricity supply and utilization. As a result, in most countries an acute shortage of foreign exchange severely hampers implementation of rural electrification schemes. This should turn attention increasingly to strategies which are less capital-intensive and less dependent on foreign exchange, such as small-hydro plants, where the resource is located near to rural demand. Increasing the local content of small-hydro project implementation has paid off in recent years, considerably reducing costs in a number of Asian and Latin American projects. Local contributions have taken the form of resource assessment at a particular site, design, construction works, and fabrication of relatively simple components of power plant such as hydraulic equipment, low pressure penstocks and gates, as well as simpler types of turbines (e.g., the Banki type). Inadequacy of indigenous technical capacity to make similar local contributions in the ESAC has meant that the few recent small-hydro projects have relied on importing both expertise and equipment. The high costs resulting have frequently fueled arguments against pursuit of small-hydro projects

  6. Modelling the economics of combined wind/hydro/diesel power systems

    International Nuclear Information System (INIS)

    Sinha, A.

    1993-01-01

    A model that stimulates the performance and economics of a combined wind/hydro/diesel plant with pumped storage has been developed. It is applied to a hypothetical site to demonstrate how a subset of the cheapest configuration of plant sizes may be identified, illustrating in particular the trade-off between the hydro storage capacity and the wind turbine penetration. It seems that, with the wind and water regimes employed, pumped storage is unlikely to have significant benefits, but may be beneficial in areas without natural inflow, in which case the reservoir is used as a store for excess wind output. (author)

  7. Ontario Hydro annual report 1975

    International Nuclear Information System (INIS)

    A financial report and statistics on Ontario energy demand are presented. Efforts to secure a reliable supply of coal and uranium are described. Ontario Hydro's expansion is now controlled by capital availability and not power demand, and this has affected 11 construction projects, including heavy water plants and nuclear generating stations. (E.C.B.)

  8. Fouling in small hydro projects; Verschmutzung von Kleinwasserkraftwerken - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Abgottspon, A.; Staubli, T.

    2010-03-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) takes a look at fouling problems encountered in small hydro installations. The report is based on ten interviews made with operators of small hydro power stations in Switzerland. A parallel project carried out in Germany is mentioned. A large variation in the degree of fouling in the various hydro power stations is noted. Sources such as leaves in autumn and algae are discussed, as are the various rinsing procedures used to clear the turbines of fouling. Power losses are discussed and measures that can be taken to prevent fouling are described. Measurements made at an installation in Freienstein, Switzerland, are presented and discussed. The report is completed with an appendix containing calculations, details on the Freienstein power plant and the results of interviews made with the ten hydro power installations examined.

  9. Vaksvikelva small hydro

    OpenAIRE

    Loe, Daniel Aarset

    2017-01-01

    Norway is in constant need of renewable energy, and hydroelectric power is still the main source. A great future potential can be found in countless small rivers scattered across the country, which could be developed through small hydro projects. In the process of converting mechanical movement - flowing water - into electric energy, about 5% turns into heat. From a power plant with an annual production of 15 GWh, this means energy enough to heat approximately 30 households is lost. In my pro...

  10. TVA, Abnormal Return, and Investor Perception on Changing of Tick Size 2 May 2016

    Directory of Open Access Journals (Sweden)

    Tri Gunarsih

    2017-07-01

    Full Text Available The objective of this study was to analyze the market reaction to the changing of capital market’s tick size regulation in May 2, 2016. The main goal of the regulation was to increase the capital market liquidity, then it’s important to test whether there was a difference in market liquidity before and after the regulation released. The method of this study was studying with Trading Volume Activity (TVA and abnormal return based on secondary data and also investor perception based on primary data. The secondary data consist of 65 samples of listed companies in Indonesia Stock Exchange. The primary data consist of 67 investors in Yogyakarta that were selected using purposive sampling method.The result of this study was mix, there was no difference before and after the release of regulation in TVA, but there was a difference in abnormal return. The result of investor perception shows that there was a positive response to the changing of tick size regulation.

  11. Potency of Micro Hydro Power Plant Development Use of Kelampuak River Flow Located in Tamblang Village – Buleleng

    Directory of Open Access Journals (Sweden)

    Dewa Ngakan Ketut Putra Negara

    2012-11-01

    Full Text Available Need of electrical energy is increasing along with people population and economic growth. According to PLN data, Bali Province’s electrical consumption is predicted growth 5,6% in average every year. Until year 2007, electrical condition in Bali is categorized critical. If Power Plat in Bali, PLTG Gilimanuk that has power 130 MW is out of system, affecting Bali’s electrical back up is minus. Consecuenlly, it will be extinguishing if there is not adding power plan or new energy supply. This problem needs to be anticipated by use of thermal energy program such as coal, gas and geothermal and use of alternative energy such as solar, wind and ocean energies. Regency of Buleleng is one of Regency in Bali having potency of renewable energy development especially water resource. It has some rivers that have potency to be developed as a Micro Hydro Power Plant (PLTMH. One of them is Kelampuak River which is located in Tamblang Village. As a first step in developing of Micro Hydro Power Plant, it needs to be known water debit and head of the river. For that reason, it needs to be investigated debit and head of Kelampuak River so that it can be predicted the power can be generated.

  12. Non-linear multi-objective model for planning water-energy modes of Novosibirsk Hydro Power Plant

    Science.gov (United States)

    Alsova, O. K.; Artamonova, A. V.

    2018-05-01

    This paper presents a non-linear multi-objective model for planning and optimizing of water-energy modes for the Novosibirsk Hydro Power Plant (HPP) operation. There is a very important problem of developing a strategy to improve the scheme of water-power modes and ensure the effective operation of hydropower plants. It is necessary to determine the methods and criteria for the optimal distribution of water resources, to develop a set of models and to apply them to the software implementation of a DSS (decision-support system) for managing Novosibirsk HPP modes. One of the possible versions of the model is presented and investigated in this paper. Experimental study of the model has been carried out with 2017 data and the task of ten-day period planning from April to July (only 12 ten-day periods) was solved.

  13. Revisiting Renewable Energy Map in Indonesia: Seasonal Hydro and Solar Energy Potential for Rural Off-Grid Electrification (Provincial Level

    Directory of Open Access Journals (Sweden)

    Agung Wahyuono Ruri

    2018-01-01

    Full Text Available Regarding the acceleration of renewable energy diffusion in Indonesia as well as achieving the national energy mix target, renewable energy map is essential to provide useful information to build renewable energy system. This work aims at updating the renewable energy potential map, i.e. hydro and solar energy potential, with a revised model based on the global climate data. The renewable energy map is intended to assist the design off-grid system by hydropower plant or photovoltaic system, particularly for rural electrification. Specifically, the hydro energy map enables the stakeholders to determine the suitable on-site hydro energy technology (from pico-hydro, micro-hydro, mini-hydro to large hydropower plant. Meanwhile, the solar energy map depicts not only seasonal solar energy potential but also estimated energy output from photovoltaic system.

  14. Managing a reservoir-based hydro-energy plant: building understanding in the buy and sell decisions in a changing environment

    International Nuclear Information System (INIS)

    Ackere, A. van; Ruud, Morten; Davidsen, Paal

    2005-01-01

    This paper describes a modelling process at a Norwegian chemical producer, who owns 20% of a reservoir based hydro-energy plant. While the initial objective was to increase the profitability of the energy plant (in particular by an improved understanding of buying and selling decisions and a reconciliation of the managerial and engineering points of view in the context of a liberalised energy market) the process resulted in the company's decision to refocus on its core-business. The process illustrates how a modelling process can lead to a fundamental re framing of the issue, resulting in major change for the company

  15. Hydro-Quebec looks to integrated development of Quebec and its regions

    International Nuclear Information System (INIS)

    Bissonnette, Lise

    1995-01-01

    Hydro-Quebec's telecommunication system, the largest private telecommunications network in Canada, was discussed. The network was set up to assure safety and efficiency of the power plants and energy transmission and distribution lines. By the year 2000 Hydro-Quebec will need electronic links with all its industrial, commercial and residential customers in order to guarantee competitive service and full customer satisfaction. Investments of about one half billion dollars have been earmarked to boost the capacity of their telecommunications grid and meet steadily growing needs. As a result of the very difficult negotiations to resolve the native land claims issue, Hydro-Quebec was forced to adapt a strict and far-reaching environmental policy, which is now beginning to pay off not only in environmental terms, but also in terms of goodwill among actual and prospective customers. As a result of these huge infrastructure projects Hydro Quebec will be in a position to guarantee people access to energy at a price that is among the lowest in the world. Although demand growth could slow, demand itself will not wane. As part of this overall strategy, Hydro-Quebec plans to defer large-scale projects, instead, for the foreseeable future it will concentrate on smaller power plants, some of which could be built on rivers that have already been tamed

  16. Fluid transient analysis and design considerations in TVA PWR feedwater systems and steam generators

    International Nuclear Information System (INIS)

    Kelley, B.T.

    1979-01-01

    TVA has evaluated a number of fluid transients in an effort to discover areas of potential problems and to improve overall unit operation. The transients recently or currently being evaluated fall into four major areas - accident analyses, fast valving, heater drain systems, and steam generators. A discussion of each area follows

  17. Energy generated for you : Newfoundland and Labrador Hydro 2003 annual report

    International Nuclear Information System (INIS)

    2004-01-01

    This report provides a consolidated review of the operations of Newfoundland and Labrador Hydro (Hydro) with focus on energy production, energy sales, and environmental commitment. The utility, a Crown Corporation owned by the Province of Newfoundland and Labrador, generates, transmits and distributes electricity to utility, industrial and residential customers. It is the parent company of the Hydro Group of Companies which includes Newfoundland and Labrador Hydro, Churchill Falls Corp. Ltd., Lower Churchill Development Corp. Ltd., Gull Island Power Co. Ltd., and Twin Falls Power Co. Ltd.. The installed generating capacity of the Hydro Group of Companies is the fourth largest in Canada. The generating assets include 10 operating hydroelectric plants, 1 oil-fired plant, 4 gas turbines, 28 diesel plants, and the Churchill Falls Hydroelectric generating station. The utility also maintains 4,800 km of transmission lines and more than 3,600 km of lower voltage distribution lines. The utility is isolated from the North American grid. Energy sales in 2003 were one per cent above 2002. The Holyrood thermal generating station had a gross production of 2061 GWh in 2003, an 18 per cent reduction from 2002. The 40 MW Granite Canal Hydroelectric generating station was completed in 2003. The utility also purchased electricity from Corner Brook Pulp and Paper and the Exploits River Partnership in order to meet the demand for capacity and energy on the island. The Hydro Group's net income decreased by 24 per cent in 2003, while there was a 3 per cent increase in revenue. Earnings are expected to be higher in 2004 due to a projected increase in rates. This annual report presented the company's financial performance, executive changes, rural rate inquiry, and reorganization. Financial statements included a thorough review and analysis of financial transactions, the auditor's report, and the customary notes to the consolidated financial statement including balance sheets, assets

  18. VZROKI MLADOLETNIŠKEGA PRESTOPNIŠTVA IN UKREPI ZA NJEGOVO PREPREČEVANJE

    OpenAIRE

    Matija, Sabina

    2013-01-01

    Diplomska naloga obravnava mladoletniško prestopništvo. Osredotoča se na vzroke in ukrepe za preprečevanje oziroma zmanjševanje prestopništva mladih. Pozornost je posvečena še obravnavi tako mladoletnih storilcev kaznivih dejanj kot mladoletnih storilcev prekrškov. Mladoletniško prestopništvo obsega kazniva dejanja in druge oblike deviantnega, negativnega odklonskega vedenja otrok in mladoletnikov, vendar je pri nas sprejeto ožje pojmovanje omenjenega pojava. Po tem konceptu obravnava kaz...

  19. B.C. Hydro drops Duke Point

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The abandonment of the proposed natural gas-fired Duke Point Power Project on Vancouver Island was discussed. It was suggested that the continuing appeal process increases the risk that the plant will not be built in time. The news followed a decision by the British Columbia (BC) Court of Appeal to hear an appeal of the project by a number of intervenors. Over $170 million has been spent on the project to date. The decision will impact the BC treasury, as the amount is being deducted from the dividends that BC Hydro would have paid to the government. A coalition of individuals and environmental groups, as well as local industry, are opposed to the plant on the basis of increased greenhouse (GHG) emissions and higher natural gas prices. The project would have required a natural gas pipeline to be built under Georgia Strait. The project was thought necessary due to the deteriorating condition of high voltage direct current cables running under the strait. BC Hydro's fallback plan for the island is load reduction. A new transmission line is also planned

  20. Optimal bidding in Turkey day ahead electricity market for wind energy and pumped storage hydro power plant

    Directory of Open Access Journals (Sweden)

    Ceyhun Yıldız

    2016-10-01

    Full Text Available In electrical grid; when the demand power increases energy prices increase, when the demand decreases energy prices decrease. For this reason; to increase the total daily income, it is required to shift generations to the hours that high demand power values occurred. Wind Power Plants (WPP have unstable and uncontrollable generation characteristic. For this reason, energy storage systems are needed to shift the generations of WPPs in time scale. In this study, four wind power plants (WPP which are tied to the Turkish interconnected grid and a pumped hydro storage power plant (PSPP that meets the energy storage requirement of these power plants are investigated in Turkey day ahead energy market. An optimization algorithm is developed using linear programming technique to maximize the day ahead market bids of these plants which are going to generate power together. When incomes and generations of the plants that are operated with optimization strategy is analyzed, it is seen that annual income increased by 2.737% compared with WPPs ‘s alone operation and generations are substantially shifted to the high demand power occurred hours.

  1. Multiple objective optimization of hydro-thermal systems using Ritz's method

    Directory of Open Access Journals (Sweden)

    L. Bayón Arnáu

    2000-01-01

    Full Text Available This paper examines the applicability of the Ritz method to multi-objective optimization of hydro-thermal systems. The algorithm proposed is aimed to minimize an objective functional that incorporates the cost of energy losses, the conventional fuel cost and the production of atmospheric emissions such as NOx and SO2 caused by the operation of fossil-fueled thermal generation. The formulation includes a general layout of hydro-plants that may form multi-chains of reservoir network.

  2. Studying the cumulative environmental effects of Hydro-Quebec's installations plan

    International Nuclear Information System (INIS)

    Dubeau, D.

    1992-01-01

    The study of the cumulative environmental effects that have been integrated with technical and economic analyses include mercury, land use in the region (territory), natural landscapes, cultural heritages, forest dynamics, regional economies and ways of life. Requests and petitions from the public about Hydro-Quebec projects fall into four categories: welfare of communities, impact on the land, environmental responsibility and preservation of plant and animal species. The cooperation of all concerned is necessary for Hydro-Quebec's developments. (author)

  3. Hybrid Micro-Hydro Power Generation Development in Endau Rompin National Park Johor, Malaysia

    Directory of Open Access Journals (Sweden)

    Yusop Azli

    2017-01-01

    Full Text Available Micro-Hydro electrical power systems are very useful for remote area electrification which does not had supply from the national grid. On the contrary, this area has river streams with high potential for micro-hydro power generation. As such, the UTHM ECO-Hydro Team embarked on a project for erecting a micro-hydro power plant with collaboration with National Education Research Center (NERC, Johor National Park Corporation in Endau Rompin. The existing power generation in this area at present is by using diesel generator gives negative impact on finance and environment in the long run. It supplies power to several including library, offices, open laboratory, chalets and dorms.. At the moment, the micro-hydro system complements the diesel generator, thus becoming a hybrid power generation system.

  4. Restoring coastal wetlands that were ditched for mosquito control: a preliminary assessment of hydro-leveling as a restoration technique

    Science.gov (United States)

    Smith, Thomas J.; Tiling, Ginger; Leasure, Pamela S.

    2007-01-01

    The wetlands surrounding Tampa Bay, Florida were extensively ditched for mosquito control in the 1950s. Spoil from ditch construction was placed adjacent to the wetlands ditches creating mound-like features (spoil-mounds). These mounds represent a loss of 14% of the wetland area in Tampa Bay. Spoil mounds interfere with tidal flow and are locations for non-native plants to colonize (e.g., Schinus terebinthifolius). Removal of the spoil mounds to eliminate exotic plants, restore native vegetation, and re-establish natural hydrology is a restoration priority for environmental managers. Hydro-leveling, a new technique, was tested in a mangrove forest restoration project in 2004. Hydro-leveling uses a high pressure stream of water to wash sediment from the spoil mound into the adjacent wetland and ditch. To assess the effectiveness of this technique, we conducted vegetation surveys in areas that were hydro-leveled and in non-hydro-leveled areas 3 years post-project. Adult Schinus were reduced but not eliminated from hydro-leveled mounds. Schinus seedlings however were absent from hydro-leveled sites. Colonization by native species was sparse. Mangrove seedlings were essentially absent (≈2 m−2) from the centers of hydro-leveled mounds and were in low density on their edges (17 m−2) in comparison to surrounding mangrove forests (105 m−2). Hydro-leveling resulted in mortality of mangroves adjacent to the mounds being leveled. This was probably caused by burial of pneumatophores during the hydro-leveling process. For hydro-leveling to be a useful and successful restoration technique several requirements must be met. Spoil mounds must be lowered to the level of the surrounding wetlands. Spoil must be distributed further into the adjacent wetland to prevent burial of nearby native vegetation. Finally, native species may need to be planted on hydro-leveled areas to speed up the re-vegetation process.

  5. Hydro-methane and methanol combined production from hydroelectricity and biomass: Thermo-economic analysis in Paraguay

    International Nuclear Information System (INIS)

    Rivarolo, M.; Bellotti, D.; Mendieta, A.; Massardo, A.F.

    2014-01-01

    Highlights: • We investigate H 2 /O 2 production from large hydraulic plant by water electrolysis. • We produce methanol and hydro-methane from H 2 /O 2 obtained. • We investigate two different configurations of the plant. • We perform a thermo-economic analysis for three scenarios in Paraguay. • We find plants optimal size using a time-dependent thermo-economic approach. - Abstract: A thermo-economic analysis regarding large scale hydro-methane and methanol production from renewable sources (biomass and renewable electricity) is performed. The study is carried out investigating hydrogen and oxygen generation by water electrolysis, mainly employing the hydraulic energy produced from the 14 GW Itaipu Binacional Plant, owned by Paraguay and Brazil. Oxygen is employed in biomass gasification to synthesize methanol; the significant amount of CO 2 separated in the process is mixed with hydrogen produced by electrolysis in chemical reactors to produce hydro-methane. Hydro-methane is employed to supply natural gas vehicles in Paraguay, methanol is sold to Brazil, that is the largest consumer in South America. The analysis is performed employing time-dependent hydraulic energy related to the water that would normally not be used by the plant, named “spilled energy”, when available; in the remaining periods, electricity is acquired at higher cost by the national grid. For the different plant lay-outs, a thermo-economic analysis has been performed employing two different software, one for the design point and one for the time-dependent one entire year optimization, since spilled energy is strongly variable throughout the year. Optimal sizes for the generation plants have been determined, investigating the influence of electricity cost, size and plant configuration

  6. Reliability database development and plant performance improvement effort at Korea Hydro and Nuclear Power Co

    International Nuclear Information System (INIS)

    Oh, S. J.; Hwang, S. W.; Na, J. H.; Lim, H. S.

    2008-01-01

    Nuclear utilities in recent years have focused on improved plant performance and equipment reliability. In U.S., there is a movement toward process integration. Examples are INPO AP-913 equipment reliability program and the standard nuclear performance model developed by NEI. Synergistic effect from an integrated approach can be far greater than as compared to individual effects from each program. In Korea, PSA for all Korean NPPs (Nuclear Power Plants) has been completed. Plant performance monitoring and improvement is an important goal for KHNP (Korea Hydro and Nuclear Power Company) and a risk monitoring system called RIMS has been developed for all nuclear plants. KHNP is in the process of voluntarily implementing maintenance rule program similar to that in U.S. In the future, KHNP would like to expand the effort to equipment reliability program and to achieve highest equipment reliability and improved plant performance. For improving equipment reliability, the current trend is moving toward preventive/predictive maintenance from corrective maintenance. With the emphasis on preventive maintenance, the failure cause and operation history and environment are important. Hence, the development of accurate reliability database is necessary. Furthermore, the database should be updated regularly and maintained as a living program to reflect the current status of equipment reliability. This paper examines the development of reliability database system and its application of maintenance optimization or Risk Informed Application (RIA). (authors)

  7. Environmental-impact assessment of hydro-power in Egypt

    International Nuclear Information System (INIS)

    Rashad, S.M.; Ismail, M.A.

    2000-01-01

    The environmental impact of energy production and use with the associated emissions of greenhouse gases, particularly CO 2 , has created much attention and growing concern at both national and international levels. In Egypt, efforts have been directed to incorporate the environment-protection issues within the overall planning of the energy sector, as appropriate to its national commitment and its techno-economic considerations. Over the past decade, 1985-1995, hydro-power had contributed between 28 and 22% of the total energy produced by Egyptian power-plants, while the contribution of the hydro capacity was between 32.4 and 21.5%. Many studies have been carried out on the impacts of the Aswan High Dam on various aspects of the environment. An objective evaluation of the Dam, based on 25 years of operational data, indicated that it has overall been positive even though it has contributed to some environmental problems. These problems, however, are significantly less than most people originally expected. This paper deals with the review and analysis of the detrimental effects of hydro-power in Egypt. An evaluation will be given of the emissions of greenhouse gases from the whole hydro-chain. (Author)

  8. The different modes of hydro-economic analysis (Invited)

    Science.gov (United States)

    Harou, J. J.; Binions, O.; Erfani, T.

    2013-12-01

    In the face of growing water demands, climate change and spatial and temporal water access variability, accurately assessing the economic impacts of proposed water resource management changes is useful. The objective of this project funded by UK Water Industry Research was to present and demonstrate a framework for identifying and using the ';value of water' to enable water utilities and their regulators to make better decisions. A hydro-economic model can help evaluate water management options in terms of their hydrological and economic impact at different locations throughout a catchment over time. In this talk we discuss three modes in which hydro-economic models can be implemented: evaluative, behavioral and prescriptive. In evaluation mode economic water demand and benefit functions are used to post-process water resource management model results to assess the economic impacts (over space and time) of a policy under consideration. In behavioral hydro-economic models users are represented as agents and the economics is used to help predict their actions. In prescriptive mode optimization is used to find the most economically efficient management actions such as allocation patterns or source selection. These three types of hydro-economic analysis are demonstrated on a UK watershed (Great River Ouse) that includes 97 different water abstractors from amongst the public water supply, agriculture, industry and energy plant cooling sectors. The following issues under dry and normal historical conditions were investigated: Supply/demand investment planning, societal cost of environmental flows, water market prices, and scarcity-sensitive charges for water rights. The talk discusses which hydro-economic modeling mode is used to study each of these issues and why; example results are shown and discussed. The topic of how hydro-economic models can be built and deployed effectively is covered along with how existing water utility operational and planning tools can be

  9. Sudar vozila u vlasništvu istog leasing društva i problem treće osobe iz AO osiguranja

    OpenAIRE

    Radionov, Nikoleta; Padovan, Adriana Vincenca

    2012-01-01

    U radu se razmatraju pravni odnosi koji nastaju u slučaju sudara dvaju (ili više) vozila u vlasništvu istog leasing društva (slučaj leasing – leasing). Prema uvriježenoj praksi na domaćem tržištu osiguranja, u takvim slučajevima dolazi do isključenja iz osiguranja šteta na vozilu temeljem osiguranja automobilske odgovornosti (AO), s obzirom na to da su vozila u vlasništvu istog leasing društva koje je i jedini osiguranik po policama AO oba (ili više) vozila sudionika nezgode. Primatelj leasin...

  10. Short-term hydro-thermal scheduling using particle swarm optimization method

    International Nuclear Information System (INIS)

    Yu, Binghui; Yuan, Xiaohui; Wang, Jinwen

    2007-01-01

    The approaches based on different particle swarm optimization (PSO) techniques are applied to solve the short-term hydro-thermal scheduling problem. In the proposed methods, many constraints of the hydro-thermal system, such as power balance, water balance, reservoir volume limits and the operation limits of hydro and thermal plants, are considered. The feasibility of the proposed algorithm is demonstrated through an example system, and the results are compared with the results of a genetic algorithm and evolutionary programming approaches. The experimental results show that all the PSO algorithms have the ability to achieve nearly global solutions, but a local version of PSO with inertia weight appears to be the best amongst all the PSOs in terms of high quality solution

  11. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  12. Application of multi-model control with fuzzy switching to a micro hydro-electrical power plant

    Energy Technology Data Exchange (ETDEWEB)

    Salhi, Issam; Doubabi, Said [Laboratory of Electric Systems and Telecommunications (LEST), Faculty of Sciences and Technologies of Marrakesh, Cadi Ayyad University, BP 549, Av Abdelkarim Elkhattabi, Gueliz, Marrakesh (Morocco); Essounbouli, Najib; Hamzaoui, Abdelaziz [CReSTIC, Reims University, 9, rue de Quebec B.P. 396, F-10026 Troyes cedex (France)

    2010-09-15

    Modelling hydraulic turbine generating systems is not an easy task because they are non-linear and uncertain where the operating points are time varying. One way to overcome this problem is to use Takagi-Sugeno (TS) models, which offer the possibility to apply some tools from linear control theory, whereas those models are composed of linear models connected by a fuzzy activation function. This paper presents an approach to model and control a micro hydro power plant considered as a non-linear system using TS fuzzy systems. A TS fuzzy system with local models is used to obtain a global model of the studied plant. Then, to combine efficiency and simplicity of design, PI controllers are synthesised for each considered operating point to be used as conclusion of an electrical load TS Fuzzy controller. The latter ensures the global stability and desired performance despite the change of operating point. The proposed approach (model and controller) is tested on a laboratory prototype, where the obtained results show their efficiency and their capability to ensure good performance despite the non-linear nature of the plant. (author)

  13. Atmospheric emissions : hydro-electricity versus other options

    International Nuclear Information System (INIS)

    Chamberland, A.; Belanger, C.; Gagnon, L.

    1996-01-01

    One of the great environmental advantage offered by hydro-electricity in northern or temperate climates includes reduced atmospheric emissions. While natural gas plants, from an environmental viewpoint, are thought to be the best fossil fuel option, they emit 18 times more greenhouse gases, at least 60 times more sulfur dioxide and hundreds of times more nitrogen oxides than do hydro-electric systems. The relative SO 2 and greenhouse gas emissions from energy systems in Canada were outlined, and their environmental impacts were described. At the same time, mention was made of other environmental pollutants, such as acid rain, photochemical smog, and particulates that continue to have major impacts on the environment, but were displaced as the focus of attention by greenhouse gases. A study was conducted to determine the effects of extreme biomass decomposition and greenhouse gas emissions from reservoirs. The study showed that at depths of more than 10 centimeters below water surface, organic matter does not contribute to greenhouse gas production, even at 20 degrees C. It was demonstrated that even when maximum biomass decomposition is assumed, a modern natural gas plant would emit 14 times more green house gases than a hydroelectric plant of comparable capacity. 13 refs., 4 tabs., 3 figs

  14. Hydro under shock

    International Nuclear Information System (INIS)

    Maffezzini, I.; Pineault, E.; Poirier, M.

    1997-01-01

    A discussion of the potential privatisation of Hydro-Quebec, and of the motivation to do so, was presented. The creation of Hydro-Quebec resulted from the nationalization in 1963 of all major electricity producers in the province of Quebec. Since its inception, Hydro-Quebec has gone through many episodes of restructuring but none more far reaching in extent, or in consequences, than the present one. The current deregulation of the electrical industry in Quebec, and the potential commercialization of Hydro-Quebec is considered to be a natural and inevitable result of the current global trend towards competition in the power industry and the demand for greater consumer choice. 1 tab

  15. Hydro-climatology

    DEFF Research Database (Denmark)

    The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal with under......The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal...... considered. The interdisciplinary approach reveals information and perspective that go beyond the study of cli ate and hydro gy alone...

  16. Mixed-integer nonlinear approach for the optimal scheduling of a head-dependent hydro chain

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-08-15

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We propose a novel mixed-integer nonlinear programming (MINLP) approach, considering hydroelectric power generation as a nonlinear function of water discharge and of the head. As a new contribution to earlier studies, we model the on-off behavior of the hydro plants using integer variables, in order to avoid water discharges at forbidden areas. Thus, an enhanced STHS is provided due to the more realistic modeling presented in this paper. Our approach has been applied successfully to solve a test case based on one of the Portuguese cascaded hydro systems with a negligible computational time requirement. (author)

  17. Role of pump hydro in electric power systems

    Science.gov (United States)

    Bessa, R.; Moreira, C.; Silva, B.; Filipe, J.; Fulgêncio, N.

    2017-04-01

    This paper provides an overview of the expected role that variable speed hydro power plants can have in future electric power systems characterized by a massive integration of highly variable sources. Therefore, it is discussed the development of a methodology for optimising the operation of hydropower plants under increasing contribution from new renewable energy sources, addressing the participation of a hydropower plant with variable speed pumping in reserve markets. Complementarily, it is also discussed the active role variable speed generators can have in the provision of advanced frequency regulation services.

  18. Global warming: a changing climate for hydro

    International Nuclear Information System (INIS)

    Oud, E.

    1993-01-01

    This paper quantifies the benefits attributable to hydroelectric power generation in preventing carbon dioxide emissions from the use of thermal plants. It proposes that utilities and funding agencies consider the societal costs associated with the emission of CO 2 in power system planning. It also suggests that the industrialized countries should consider changing their funding practice and give more appropriate credits for the construction of hydro plants in developing countries, with a view to avoiding the construction and operation of fossil fuelled powerplants. (author)

  19. Dionex series 8000 on-line analyzer, Sequoyah Nuclear Power Plant. Final report

    International Nuclear Information System (INIS)

    1986-03-01

    This project was initiated to develop a custom-designed online water analyzer (ion chromatograph) for secondary water chemistry control in TVA's nuclear plants. This water analyzer development was conducted pursuant to a cooperative research agreement with the Dionex Corporation. Dionex developed and installed a dual channel, six stream analyzer on the secondary side of TVA's Sequoyah Nuclear Plant. The analyzer was developed for real time detection of sodium, chloride, and sulfate in any of the six sampling streams. The analyzer is providing Sequoyah's plant personnel with reliable secondary water chemistry data in a much more timely manner than the past grab sampling techniques. Results on the performance of the analyzer show that it is performing above and beyond the expectations of plant personnel. Since its installation at Sequoyah, there have been 29 units ordered from Dionex including 1 unit for Sequoyah, 5 units for Browns Ferry, and 23 units for other utilities. In the future, the analyzer will allow plant staffs to take corrective action before corrosive conditions occur or before having to derate a unit

  20. 75 FR 18572 - Supplemental Environmental Impact Statement for Sequoyah Nuclear Plant Units 1 and 2 License...

    Science.gov (United States)

    2010-04-12

    ... TENNESSEE VALLEY AUTHORITY Supplemental Environmental Impact Statement for Sequoyah Nuclear Plant... National Environmental Policy Act. TVA will prepare a supplemental environmental impact statement (SEIS) to update information in the 1974 Final Environmental Statement for Sequoyah Nuclear Plant Units 1 and 2...

  1. The Nothuesli small hydro project; Wasserkraftwerk Nothuesli, Gonzenbaechli - Vorprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Balachandran, S.; Jorde, K.

    2008-07-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  2. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    McCredie, J.

    1984-01-01

    This report briefly describes Ontario Hydro's nuclear program, examining the design and construction status, and the future from Ontario Hydro's perspective. Ontario Hydro relies heavily on nuclear power. Nuclear fuel was responsible for approximately 34% of Ontario Hydro's energy production in 1983. The nuclear proportion was supplied by twelve operating units located: NPD, Douglas Point, Pickering A and B. It is expected that by approximately 1992, 65% of the total energy needs will be generated through nuclear power

  3. Dynamic modeling, simulation and control design of an advanced micro-hydro power plant for distributed generation applications

    Energy Technology Data Exchange (ETDEWEB)

    Marquez, J.L. [Instituto de Energia Electrica, Universidad Nacional de San Juan, Av. Libertador San Martin Oeste 1109, J5400ARL San Juan (Argentina); Molina, M.G. [CONICET, Instituto de Energia Electrica, Universidad Nacional de San Juan, Av. Libertador San Martin Oeste 1109, J5400ARL San Juan (Argentina); Pacas, J.M. [Institut fuer Leistungselektronik und Elektrische Antriebe, Universitaet Siegen, Fachbereich 12 Hoelderlinstr 3, D 57068 Siegen (Germany)

    2010-06-15

    A small-scale hydropower station is usually a run-of-river plant that uses a fixed speed drive with mechanical regulation of the turbine water flow rate for controlling the active power generation. This design enables to reach high efficiency over a wide range of water flows but using a complex operating mechanism, which is in consequence expensive and tend to be more affordable for large systems. This paper proposes an advanced structure of a micro-hydro power plant (MHPP) based on a smaller, lighter, more robust and more efficient higher-speed turbine. The suggested design is much simpler and eliminates all mechanical adjustments through a novel electronic power conditioning system for connection to the electric grid. In this way, it allows obtaining higher reliability and lower cost of the power plant. A full detailed model of the MHPP is derived and a new three-level control scheme is designed. The dynamic performance of the proposed MHPP is validated through digital simulations and employing a small-scale experimental set-up. (author)

  4. Production method of hydrogen jet plasma process in hydro machinery

    International Nuclear Information System (INIS)

    Amini, F.

    2007-01-01

    The purpose of present paper is to the process of plasma formation in hydro machinery when a hydro turbine operates at various conditions and load rejection. By investigation the power, shock pressure , and impact effects of hydro machinery, it is revealed that energy and hydrogen are generated by the plasma process. The investigation on several turbines of various hydro power plants reveals that cold fusion process in hydro machinery generates hydrogen. The hypothesis concerning the participation of alkaline metals in river water and the atomic nuclei of the runner blade material in the formation of hydrogen are considered. It is possible to assume hydrogen, deuterium, helium, and tritium atoms (based on Dr. Mizuno and Dr. Kanarev theories) that are formed, diffuse into cavitation bubbles. The plasma is generated during the collapse of the bubble; thus, the quantity of burnt hydrogen determine the volume of generating hydrogen and the impact force caused by hydrogen explosion (noise).There are five main notions, which can determine hydrogen and plasma process: (1) turbine power effect, (2) high shock pressure, (3) crack on turbine parts, (4) impacts effects and (4) the lift of rotating parts. The frequency of the excitation lies in a range from 0.786 to 1.095 Hz.In future, it may be possible to design hydro turbines based on the plasma process that generates hydrogen; or there may exist turbines that rotate with a mixture of hydrogen explosion and water energies

  5. Assessing the role of large hydro in Canada's electricity future

    International Nuclear Information System (INIS)

    Lee Pochih

    1992-01-01

    Electric power in Canada was first generated by steam in the 1880s. The use of hydroelectricity spread rapidly due to abundant water resources and the nationalization of power companies by the provinces; by 1920, 97% of Canadian electricity production came from hydroelectric plants. Thermal generation became competitive by the 1960s, when most of the best hydro sites had been developed, and nuclear generation also started gaining a share of the market. By 1991, hydroelectricity's share of Canadian power production had declined to around 60%. Hydroelectric power has long been used as an instrument of Canadian industrial policy. Given the amount and importance of utility capital expenditures, it was recognized that hydropower development could serve such policy objectives as job creation, industrial development, and macroeconomic stabilization. Creation of provincially owned utilities led to construction of large hydroelectric projects, notably in Quebec, British Columbia, Manitoba, and Newfoundland. The 20 largest hydroelectric power plants in Canada have a total installed capacity of 35,704 MW, representing ca 59% of Canada's total 1991 hydro capacity. The construction of such large projects is not expected to proceed as quickly as in the past because of environmental concerns. However, a number of factors favor continuation of development of hydro resources: a remaining potential estimated at ca 44,000 MW; simplification of electricity export regulations; more stringent air pollution standards that favor non-polluting energy sources; and a moratorium on nuclear power plants in Ontario. 4 tabs

  6. Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' hydroelectric system into the power system of the Republic of Macedonia

    International Nuclear Information System (INIS)

    Rumenova, Evica; Naumoski, Kliment

    2001-01-01

    At the and of 1998, a study on conditions and possibilities of the 'Shara' hydroelectric system construction was prepared. The study considers an interesting idea for building up three reversible power plants. From electricity point of view the study emphasizes several significant issues that require comprehensive analyses in order to define the conditions and possibilities for their development. This paper attempts to give an overview of one of this issues: Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' - system into the power supply system of Republic of Macedonia. (Original)

  7. HydroSoft coil versus HydroCoil for endovascular aneurysm occlusion study: A single center experience

    International Nuclear Information System (INIS)

    Guo Xinbin; Fan Yimu; Zhang Jianning

    2011-01-01

    Background and purpose: The HydroCoil Embolic System (HES) was developed to reduce recurrences of aneurysms relative to platinum coils. But the HydroCoil Embolic System was characterized with many limitations. The manufacturer had recognized the challenge and recently a new design of hydrogel-coated coil-HydroSoft has become available in the market as the new generation HydroCoil. We reported our initial experience using HydroSoft coil versus HydroCoil in our center. Methods: 75 aneurysms embolized primarily using HydroSoft Coils from July 2008 to May 2009 were compared with 66 volume- and shape-matched aneurysms treated with HydroCoils from March 2006 to August 2008. Outcome measures included length and number of coils used, contrast volume, and length of hospital stay. During embolization, a stable framework was first established with bare coils, and hydrogel-coated coils were used subsequently to increase the packing density. Follow-up angiographic results 6 months after treatment were evaluated among some of the patients. Results: Successful coil embolization was achieved in all patients. There were no differences in average total coil length used per aneurysm. There were no differences in length of hospital stay and packing density. HydroSoft coils were more suitable using as the finishing or final coil. HydroSoft coil decreased the procedure-related retreated rates, and aneurysm packing was finished with soft, flexible HydroSoft coil and decreased the neck remnant rates. Follow-up angiography in HydroSoft-treated patients at 6 months revealed aneurysm stability without significant residual neck. Conclusions: HydroSoft coil allowed us to deploy coated coils with good packing density. A slight expansion of these coils at the neck can be expected to reduce neck remnant and potentially inhibit recurrence.

  8. Premagovanje izzivov življenja z disleksijo od otroštva do odraslosti

    OpenAIRE

    Javornik, Pia

    2017-01-01

    V magistrskem delu smo raziskali izzive, s katerimi se srečujejo osebe z disleksijo skozi celoten razvojni potek od otroštva do odraslosti. V teoretičnem delu smo povzeli nekatere definicije ter teoretične razlage disleksije in njeno izražanje skozi različna razvojna obdobja, vezana na potek znotraj izobraževalnega sistema. Predstavili smo zakonodajne možnosti prilagajanja vzgojno izobraževalnega procesa osebam z disleksijo v slovenskem prostoru. V nadaljevanju smo se osredotočili na značilno...

  9. Hydro-Quebec proudly celebrates 50 years of service

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    The history of the electric utility Hydro-Quebec is reviewed from its creation in 1944 as the Hydroelectric Commission of Quebec. The utility inherited an installed capacity of 696 MW and it first went about standardizing electricity supply conditions and establishing equal rates in the Montreal area. It began major construction projects in the mid-1950s with the Bersimis and Carillon hydroelectric plants. By 1962, installed capacity reached 3,657 MW. In 1963, Hydro-Quebec bought 10 private electricity distribution companies, 45 cooperatives, and a series of private or municipal systems. In 1965, the utility commissioned the world's first 735-kV transmission line. In 1967, Hydro-Quebec opened its research institute, and another laboratory specializing in electrotechnologies was opened in 1987. The 1970s were noted for the James Bay hydroelectric projects, the development of which was eventually governed by the landmark James Bay and Northern Quebec Agreement of 1975. Electricity exports greatly expanded in the 1970s and early 1980s as larger hydroelectric projects came on stream. Challenges of the 1990s include service quality, environmental issues, energy efficiency, and conservation. Hydro-Quebec's Energy Efficiency Project has a target of annual savings of 9.3 TWh by the year 2000. Energy efficiency and power system upgrading are priorities for serving future customer needs. Hydro-Quebec continues to promote hydroelectric power as the cheapest, most environmentally benign form of energy and future generating stations in progress include phase II of the LaGrande complex (to be completed 1996). 2 figs

  10. Computer Security for Commercial Nuclear Power Plants - Literature Review for Korea Hydro Nuclear Power Central Research Institute

    Energy Technology Data Exchange (ETDEWEB)

    Duran, Felicia Angelica [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Security Systems Analysis Dept.; Waymire, Russell L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Security Systems Analysis Dept.

    2013-10-01

    Sandia National Laboratories (SNL) is providing training and consultation activities on security planning and design for the Korea Hydro and Nuclear Power Central Research Institute (KHNPCRI). As part of this effort, SNL performed a literature review on computer security requirements, guidance and best practices that are applicable to an advanced nuclear power plant. This report documents the review of reports generated by SNL and other organizations [U.S. Nuclear Regulatory Commission, Nuclear Energy Institute, and International Atomic Energy Agency] related to protection of information technology resources, primarily digital controls and computer resources and their data networks. Copies of the key documents have also been provided to KHNP-CRI.

  11. Computer Security for Commercial Nuclear Power Plants - Literature Review for Korea Hydro Nuclear Power Central Research Institute

    International Nuclear Information System (INIS)

    Duran, Felicia Angelica; Waymire, Russell L.

    2013-01-01

    Sandia National Laboratories (SNL) is providing training and consultation activities on security planning and design for the Korea Hydro and Nuclear Power Central Research Institute (KHNPCRI). As part of this effort, SNL performed a literature review on computer security requirements, guidance and best practices that are applicable to an advanced nuclear power plant. This report documents the review of reports generated by SNL and other organizations [U.S. Nuclear Regulatory Commission, Nuclear Energy Institute, and International Atomic Energy Agency] related to protection of information technology resources, primarily digital controls and computer resources and their data networks. Copies of the key documents have also been provided to KHNP-CRI.

  12. Some impacts and mitigations for small hydro developments in Newfoundland and Labrador

    International Nuclear Information System (INIS)

    Buchanan, R.

    1993-01-01

    Potential adverse impacts of small hydro power plants were defined and some of the mitigative techniques that can be used to eliminate or alleviate these impacts were outlined. Potential adverse impacts involved in the construction of hydro projects were identified as those associated with construction of dams, borrow areas, access roads, powerhouses, canals, penstocks, and transmission lines. Fish passage and fish habitat maintenance were also among the major issues that confront most of the proposed small hydro projects in Newfoundland. Fish passage and habitat issues received particular attention in view of their obvious importance in a province where fishing is a way of life for large segments of the population. Major challenges included both upstream and downstream fish passage, and maintenance flows downstream of dams. Upstream migration could be facilitated by fishways. Downstream migration of Atlantic salmon smolts was said to be more problematic, but could be addressed by strategies such as intake design, screens, bypasses, sluices, turbine selection, plant shutdowns at critical times and operation of turbines at peak efficiencies. 12 refs., 2 tabs

  13. Study of cavitation in hydro turbines. A review

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Pardeep; Saini, R.P. [Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee 247667 (India)

    2010-01-15

    Reaction turbines basically Francis turbines and propeller/Kaplan turbines are suitable for medium and low head hydropower sites. The management of the small hydropower plants is an important factor, for achieving higher efficiency of hydro turbines with time. Turbines show declined performance after few years of operation, as they get severely damaged due to various reasons. One of the important reasons is erosive wear of the turbines due to cavitation. Reaction turbines, however are more prone to cavitation especially Francis turbines where a zone in the operating range is seriously affected by cavitation and considered as forbidden zone. Cavitation is a phenomenon which manifests itself in the pitting of the metallic surfaces of turbine parts because of the formation of cavities. In the present paper, studies undertaken in this field by several investigators have been discussed extensively. Based on literature survey various aspects related to cavitation in hydro turbines, different causes for the declined performance and efficiency of the hydro turbines and suitable remedial measures suggested by various investigators have been discussed. (author)

  14. 76 FR 67175 - Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp...

    Science.gov (United States)

    2011-10-31

    ...; 14149-000] Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp... Lock Hydro Friends Fund XXXVI (Lock Hydro) and on April 11, 2011, Arkansas Electric Cooperative Corp... & Dam No. 3, as directed by the Corps. Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090...

  15. Hydro-energy

    International Nuclear Information System (INIS)

    Bacher, P.; Tardieu, B.

    2005-01-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  16. A tale of three hydros - post-privatisation in Patagonia

    International Nuclear Information System (INIS)

    Smith, H.F.

    1994-01-01

    When Argentina's state-owned utility, operating in northern Patagonia, sold off hydro-electric generating plants in 1993, they were bought by several North American utility companies. This article looks at the problems these companies encountered and examines whether the enterprise has shown itself to be economically valuable. (UK)

  17. Workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. Part I

    International Nuclear Information System (INIS)

    1997-01-01

    The publication has been set up as proceedings of the workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. The proceedings consist of the following chapters: (1) BOT schemes as financial model of hydro power projects; (2) Application of pumped storage plants in the control of the Slovak power system and the possibility of pumped storage plant Ipel exploitation towards the year 2010; (3) Use of hydro energetic potential of streams from the aspects of nature conservation on the example of north Slovakia; (4) Ecological aspects of the hydro power industry and possible means to improve ecological conditions of water reservoirs; (5) Preparation and realization of HPP Zilina; (6) Freudenau HPP. ecological measures and groundwater management; (7) Present state of hydro power development in Austria

  18. Public safety for BC Hydro's dams and powerhouse

    Energy Technology Data Exchange (ETDEWEB)

    Cattanach, D. [BC Hydro, Burnaby, BC (Canada). Emergency Preparedness Security and Public Safety

    2009-07-01

    This presentation reviewed public safety and historical practices at British Columbia (BC) Hydro. Historically, visitors were guided to safe locations at their facilities by visitor centres and public use management areas. Fences and booms were used to protect visitors from the more dangerous areas around the facility. This presentation also described the features of the safety management plans that BC Hydro has in place for each of its 41 facilities. The safety management plans are approved by the plant managers; they have common controls such as fences and signs; and there are excellent maps defining the danger areas. New risks that were identified were also presented. The next steps for BC Hydro include test driving the draft Canadian Dam Association guidelines for the Aberfeldie Dam; a new powerhouse to reduce overtopping of the dam during the spring; and continuing with public safety hazards and controls such as bow-ties. figs.

  19. Electricity production by hydro power plants: possibilities of forecasting

    International Nuclear Information System (INIS)

    Barkans, J.; Zicmane, I.

    2004-01-01

    Hydro energy accounts for 17% of global electricity production and is the most important source of renewable energies actively used today, being at the same time the least influential ecologically. Its only disadvantages is that this kind of energy is difficult to forecast, which hinders not only the planning of tariffs, year budgets and investments, but also contractual negotiations in particular month. The paper shows that the forecasting of hydro energy production can be linked to certain natural processes, namely, to the cyclic behaviour observed for water flows of the world's rivers. The authors propose a method according to which the forecasting procedure is performed using the data of observations as signals applied to special digital filters transforming the water flow process into integral and differential forms, which after appropriate treatment are expected again in usual water flow units. For this purpose the water flow integral function is to be divided, by means of spectral analysis, into 'low-frequency' (with a semi-period of 44 years) and 'high-frequency' (4-6 year semi-periods) components, which are of different origin. Each of them should be forecasted separately, with the following summation of the results. In the research it is shown that the cyclic fluctuations of world rivers' water flows are directly associated with variations in the Solar activity. (authors)

  20. Hydro-Quebec annual report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    An overview is presented of the activities of Hydro-Quebec for the year ended December 31, 1993, as well as its financial status. Export sales of electricity to other Canadian provinces and the USA are reported. Research programs and demonstration projects are described, as well as the utility's international activities. Environmental and economic considerations for the province are presented. Financial data includes total sales, sales by sector, export sales, and rate changes. A financial statement is included. In 1993, total sales volume was 152.1 TWh, or 7.5 TWh more than in 1992, for a total sales revenue of $7,004 million, an increase of 3.5% over 1992. Sales in Quebec increased 5 TWh, with nearly all of this increase coming from the industrial sector. Exports outside of Quebec totalled 15 TWh, or 20% more than in 1992. The largest increase in exports was in the form of short-term sales to the USA. Expenditures in 1993 were $3,761 million, only slightly more than in 1992. Facilities commissioned in 1993 included the Brisay power plant, two of six units at the Laforge-1 plant, and the north portion of the 12th transmission line from the LaGrande complex. Total installed capacity of the Hydro-Quebec system reached 29,131 MW, and total power produced was 131.6 TWh. Total length of transmission and distribution lines in 1993 reached 29,869 km and 100,908 km respectively. 9 figs., 17 tabs

  1. Frequency Regulation of a Hybrid Wind–Hydro Power Plant in an Isolated Power System

    Directory of Open Access Journals (Sweden)

    Guillermo Martínez-Lucas

    2018-01-01

    Full Text Available Currently, some small islands with high wind potential are trying to reduce the environmental and economic impact of fossil fuels by using renewable resources. Nevertheless, the characteristics of these renewable resources negatively affect the quality of the electrical energy, causing frequency disturbances, especially in isolated systems. In this study, the combined contribution to frequency regulation of variable speed wind turbines (VSWT and a pump storage hydropower plant (PSHP is analyzed. Different control strategies, using the kinetic energy stored in the VSWT, are studied: inertial, proportional, and their combination. In general, the gains of the VSWT controller for interconnected systems proposed in the literature are not adequate for isolated systems. Therefore, a methodology to adjust the controllers, based on exhaustive searches, is proposed for each of the control strategies. The control strategies and methodology have been applied to a hybrid wind–hydro power plant on El Hierro Island in the Canary archipelago. At present, in this isolated power system, frequency regulation is only provided by the PSHP and diesel generators. The improvements in the quality of frequency regulation, including the VSWT contribution, have been proven based on simulating different events related to wind speed, or variations in the power demand.

  2. Ontario Hydro's DSP update

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Ontario Hydro's Demand/Supply Plan (DSP), the 25 year plan which was submitted in December 1989, is currently being reviewed by the Environmental Assessment Board (EAB). Since 1989 there have been several changes which have led Ontario Hydro to update the original Demand/Supply Plan. This information sheet gives a quick overview of what has changed and how Ontario Hydro is adapting to that change

  3. 78 FR 56224 - Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3401-049] Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption 1. By documentation filed July 8, 2013 and supplemented... Hydro-WM, LLC. The project is located on the Rockfish River in Nelson County, Virginia. The transfer of...

  4. Provincial hydro expansions

    Energy Technology Data Exchange (ETDEWEB)

    Froschauer, K J

    1993-01-01

    A study of the development of five provincial hydroelectric utilities in Canada indicates that power companies and the state invited manufacturers to use hydroelectricity and natural resources in order to diversify provincial economies. These hydro expansions also show that utilities and government designed hydro projects to serve continental requirements; serving both objectives became problematic. It is argued that when the Canadian state and firms such as utilities use hydro expansions to serve both continentalism and industrialization, then at best they foster dependent industrialization and staple processing. At worst, they overbuild the infrastructure to generate provincial surplus energy for continental, rather than national, integration. Hydro developments became subject to state intervention in Canada mainly through the failures of private utilities to provide power for the less-lucrative industrial markets within provincial subregions. Although the state and utilities invited foreign firms to manufacture hydro equipment within the provinces and others to use electricity to diversify production beyond resource processing, such a diversification did not occur. Since 1962, ca 80% of industrial energy was used to semi-process wood-derived products, chemicals, and metals. The idea for a national power network became undermined by interprovincial political-economic factors and since 1963, the federal national/continential power policy prevailed. 187 refs., 6 figs., 52 tabs.

  5. Bearing Diagnostics of Hydro Power Plants Using Wavelet Packet Transform and a Hidden Markov Model with Orbit Curves

    Directory of Open Access Journals (Sweden)

    Gabriel Pino

    2018-01-01

    Full Text Available The contribution of a medium-sized hydro power plant to the power grid can be either at base load or at peak load. When the latter is the most common operation mode, it increases the start and stop frequency, intensifying the hydro turbine components’ degradation, such as the guide bearings. This happens due to more frequent operation in transient states, which means being outside the service point of the machines’ nominal condition, consisting of speed, flow, and gross head. Such transient state operation increases the runner bearings’ mechanical vibration. The readings are acquired during the runner start-ups and filtered by a DC component mean value and a wavelet packet transform. The filtered series are used to estimate the relationship between the maximum orbit curve displacement and the accumulated operating hours. The estimated equation associated with the ISO 7919-5 vibration standards establishes the sojourn times of the degradation states, sufficient to obtain the transition probability distribution. Thereafter, a triangular probability function is used to determine the observation probability distribution in each state. Both matrices are inputs required by a hidden Markov model aiming to simulate the equipment deterioration process, given a sequence of maximum orbit curve displacements.

  6. Instrumentation and controls training in TVA: a story of large numbers

    International Nuclear Information System (INIS)

    Conner, D.L.

    1981-01-01

    The Tennessee Valley Authority currently has four nuclear units on line with seventeen units planned prior to the year 2000. Providing a permanent instrumentation and controls workforce, projected to be approximately 700 trades and labor craftsmen, is a formidable task requiring the cooperative efforts of many diverse groups: mangement and labor, engineers and craftsmen, students and instructors. In TVA, the primary source of skilled I and C craftsmen is through formal training programs conducted in cooperation with the craft bargaining unit, the International Brotherhood of Electrical Workers. The purpose of this paper is to describe and review the progress of two of these programs: the Instrument Mechanic Training Program and the Senior Instrument Mechanic Training Program

  7. Current status and future developments of small and micro hydro in southern Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2012-05-01

    Full Text Available -1 Current status and future developments of small and micro hydro in southern Africa Wim Jonker Klunne Council for Scientific and Industrial Research (CSIR) PO Box 395 Pretoria 0001 South Africa Introduction Small and micro hydropower... are renewable energy technologies that have large potential in the south- ern African region, both for grid and off-grid applications. Within the region a good understanding exists on the potential for large scale hydro with a substantial number of plants...

  8. A comparison of the aquatic impacts of large hydro and small hydro projects

    Science.gov (United States)

    Taylor, Lara A.

    The expansion of small hydro development in British Columbia has raised concerns surrounding the effects of these projects, and the provincial government's decision to proceed with Site C has brought attention to the impacts of large hydro. Together, these decisions highlight that there are impacts associated with all energy development. My study examines the aquatic effects of large and small hydro projects using two case study sites: Site C and the Upper Harrison Water Power Project. I first determine the aquatic effects of each of the case study sites. Next, I use existing literature and benefits transfer to determine the monetary value of these effects. My results suggest that, with mitigation, small hydro projects have less of an effect on the environment than a large hydro project per unit of electricity. I also describe the implications of my study in the context of current British Columbia energy policy. Keywords: hydropower; aquatic effects. Subject Terms: environmental impact assessment; benefits transfer.

  9. The contribution of small hydro power stations to the electricity generation in Greece: Technical and economic considerations

    International Nuclear Information System (INIS)

    Kaldellis, J.K.

    2007-01-01

    Hydropower is the most widely used renewable energy source worldwide, contributing almost with 18.5% to the fulfillment of the planet electricity generation. However, most locations in Europe appropriate for the installation of large hydro power stations have already been exploited. Furthermore, there is a significant local communities' opposition towards new large power stations; hence, small hydro power stations remain one of the most attractive opportunities for further utilization of the available hydro potential. Greece and more precisely the country's mainland possesses a significant hydro-power potential which is up to now only partially exploited. In parallel, a large number of private investors have officially expressed their interest in creating small hydro power stations throughout the country, encouraged by the significant Greek State subsidy opportunities for renewable energy applications. However, up to now a relatively small number of projects have been realized, mainly due to decision-making problems, like the administrative bureaucracy, the absence of a rational national water resources management plan and the over-sizing of the proposed installations. Certainly, if the above problems are suitably treated, small hydro-power plants can be proved considerably profitable investments, contributing also remarkably to the national electricity balance and replacing heavy polluting lignite and imported oil. In the context of the above interesting issues, the present study reviews in detail the existing situation of small hydropower plants in Greece and investigates their future prospects as far as the energy, economic and environmental contribution are concerned

  10. Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2006-01-01

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We use a method based on nonlinear programming (NLP), namely quadratic programming, to consider hydroelectric power generation a function of water discharge and of the head. The method has been applied successfully to solve a test case based on a realistic cascaded hydro system with a negligible computational time requirement and is also applied to show that the role played by reservoirs in the hydro chain do not depend only on their relative position. As a new contribution to earlier studies, which presented reservoir operation rules mainly for medium and long-term planning procedures, we show that the physical data defining hydro chain parameters used in the nonlinear model have an effect on the STHS, implying different optimal storage trajectories for the reservoirs accordingly not only with their position in the hydro chain but also with the new parameterisation defining the data for the hydro system. Moreover, considering head dependency in the hydroelectric power generation, usually neglected for hydro plants with a large storage capacity, provides a better short-term management of the conversion of the potential energy available in the reservoirs into electric energy, which represents a major advantage for the hydroelectric utilities in a competitive electricity market. (author)

  11. Hydro investment analysis under new market conditions

    Energy Technology Data Exchange (ETDEWEB)

    Doorman, Gerard

    2010-07-01

    Full text: A future energy system with stronger coupling to Europe and with an increased share of non-regulated renewables will lead to increasing variability of the demand faced by the hydro system. In a market based system these variations will be reflected by larger daily price variations, both in the Elspot day ahead market, the Elbas intraday market and in the balancing market. With its unique regulation capabilities, hydro power will be very well positioned to handle these variations. However, existing model concepts for long term hydro scheduling were not developed for this framework, and do not take the new market conditions into account to a sufficient degree. Therefore hydro scheduling tools used for upgrading and investment analysis as well as analysing consequences of new environmental demands need adaptation to a finer temporal resolution, and to perform optimisation under varying constraints and uncertain input data for inflow and electricity prices. Focus is on investment analysis for a river system or power producer. Existing models can be grouped in the long-term (scheduling models with a time horizon up to 5 years) EOPS (Vansimtap), EOPS-ST (SimtapEffekt) and ProdRisk, and the shortterm scheduling models with a typical time horizon up to a few weeks, but focus on 1-2 days (SHOP and ID-SIM). A perfect tool in the present context would combine the properties of the long term stochastic optimisation models with the modelling details of SHOP and/or ID-SIM. However, this is probably not possible and simplifications will be necessary. Some important deficiencies in the present long term models are: Insufficiently realistic plant models in the relevant optimization models; Time delays are not handled; Handing of flexible / state dependent constraints; Handling of ramping constraints; Modelling of the cost of frequent regulations (wear and tear); Reserve markets As a result of these deficiencies the investment analysis does not adequately assess the value

  12. A study on the hydrotreating of coal hydro liquefaction residue and its kinetics

    Energy Technology Data Exchange (ETDEWEB)

    Huang, J.; Lu, X.; Zhang, D.; Gao, J. [Department of Chemical Engineering for Energy Resources, East China University of Science and Technology, Shanghai (China)

    2010-09-15

    Hydro-conversion of coal hydro liquefaction residue obtained from a 6 t/day pilot plant of Shenhua Group in Shanghai was carried out under the hydrotreating condition. The coal hydro liquefaction residue and its product were extracted in sequence with n-hexane, toluene and tetrahydrofuran in a Soxhlet apparatus. The n-hexane soluble fractions increased with the increase of reaction temperature and time. Its amount increased from 14.14% to a maximum of 40.86% under the conditions of 470 {sup o}C and 30 min, which meant that moderate extension of coal residence time in the coal hydro liquefaction reactor is beneficial to the increase of oil yield. A 4-lumped kinetic model of coal hydro liquefaction residue hydro-conversion was performed using solubility-based lumped fractions. In the model, the tetrahydrofuran insoluble fractions were classified into two parts: easily reactive part and unreactive part. The kinetic parameters were estimated by a fourth-order Runge-Kutta method and a nonlinear least squares method, and the apparent activation energies were calculated according to the Arrhenius Equation. A large quantity of total catalyst consisting of remained liquefaction catalyst, part of the mineral from raw coal and additive Fe-based catalyst could considerably reduce the apparent activation energy of hydro-conversion for the toluene insoluble/tetrahydrofuran insoluble fractions to 36.79 kJ-mol{sup -1}. The calculated values of the model coincided well with the experimental values. (authors)

  13. NRC regulation of TVA. Hearings before the Subcommittee on Oversight and Investigations of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, Second Session, February 26, June 11, and October 1, 1986

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    Nuclear Regulatory Commissioners, Tennessee Valley Authority (TVA) chairman Charles Dean, and members of both agencies, as well as representatives of review groups testified at a hearing on the performance of regulators in overseeing TVA's nuclear programs, all of which are inoperative. The witnesses reviewed certification, licensing, and inspection processes which reflect poor management on the part of NRC and indifference to TVA. Of major concern was the sacrifice of safety for expeditious construction. The hearing took place over three days in February, June, and October of 1986. Material submitted for the record follows the testimony of the 19 witnesses

  14. Unbalance influence on the rotating assembly dynamics of a hydro

    Science.gov (United States)

    Jurcu, M.; Pădureanu, I.; Campian, C. V.; Haţiegan, C.

    2018-01-01

    The dynamics of the rotating parts of a hydro is characterized by the dynamic interaction between the rotor, the stator and the working fluid in order to operate the hydro. The main factors influencing the dynamics of the rotating parts of a hydro are: rotor unbalance, unbalanced magnetic pull, shaft misalignment and hydraulic flow regime. Rotor unbalanced is one of the most common factors influencing the dynamic stability of the rotating parts of a hydro. The unbalanced is determined by: uneven distribution of rotating masses, displacement of parts in the rotor during rotation, inhomogeneity of rotor component materials, expansion of the rotor due to heating, and rising speed during the transient discharge of the load. The mechanical imbalance of a rotor can lead to important forces, responsible for the vibration of the machine, which ultimately leads to a shorter operating time. Even a low unbalance can lead, in the case of high speed machines, to major unbalance forces that cause significant damage to the equipment. The unbalance forces cause additional vibrations in the bearings as well as in the foundation plate. To avoid these vibrations, it is necessary in the first stage to balance the static rotor in the construction plant and then to a dynamic rotation balancing.

  15. Strategies for growth of hydro electric power

    International Nuclear Information System (INIS)

    Khera, D.V.

    1998-01-01

    Hydro power on account of its several inherent advantages has a key role to play in the development of long term energy strategies based on diversified and balance use of natural national resources. Our country is fortunate to be endowed with large hydro-electric potential. It is estimated that the hydro potential while fully developed may yield to an installed capacity of 1,50,000 MW. An attempt has been made in this paper to examine and analyse the status and trend of hydro power development, need for accelerated development of hydro power, myths about hydro electric projects, principal causes responsible for scaling down of hydro share in the total installed capacity and strategies which could restore optimum hydro thermal mix. (author)

  16. Renewal of the small hydro power plant 'La Foulaz' on the river Orbe in Vallorbe, Switzerland; Rehabilitation de la petite centrale hydroelectrique de la Foulaz sur l'Orbe a Vallorbe. Etude d'avant projet - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Chenal, R.; Denis, V. [La Foulaz Energies SA, Vallorbe (Switzerland); Chuat, O. [RWB Eau et Environnement SA, Cernier (Switzerland)

    2009-08-15

    For now nearly four centuries, hydro power is used on the site named 'La Foulaz' on the river Orbe in the Vallorbe municipal territory. The existing small-scale hydro power plant is under neglect since 1970, although it enjoys a permanent water usage concession of 4.2 m{sup 3}/s. Since June 2008 the company 'La Foulaz Energie SA' owns the site and the water concession and is planning the renewal of the hydro power plant. The plan is to replace the existing permanent water flow rate usage concession by a higher water flow rate usage one of reasonable but limited duration. Reliable hydrological data are available from the Swiss Federal Administration as well as from the electricity utility 'Romande Energie SA' that operates the 'La Dernier' hydro power plant located up-stream. According to these data the design flow rate of 10 m{sup 3}/s has been selected for the new 'La Foulaz' plant. The available water head for the turbine is in the range 1.46 to 3-00 m, depending on the flow rate in the river Orbe. The average annual power production is estimated to 708,000 kWh. The peak electrical power would be 164 kW. With a cost recovery time of 25 years the production cost is estimated to 25 Swiss cents/kWh. This just enables to balance the budget. (author)

  17. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    International Nuclear Information System (INIS)

    Wiebe, P.A.

    1994-01-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs

  18. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    Energy Technology Data Exchange (ETDEWEB)

    Wiebe, P.A

    1994-06-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs.

  19. Reversible pumped hydro - benefits and challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Torbjoern K.; Walseth, Eve C.

    2010-07-01

    Full text: The Norwegian hydro power system is dominated with high head turbines, Pelton and Francis with high capacity in the reservoirs. Originally they were built for secure energy supply. In the system there are also reversible pump turbine (RPT) plants where in times with spare energy, made it possible to pump water from the lower reservoir to the higher. Again the idea was to secure energy supply, which meant pumping in early autumn to fill the reservoirs for winter. In the recent years, a more active use of the RPT plants has been actualized. The free market made price difference between night and day interesting, hence a more frequent pumping was desirable. In the coming years, new-renewable energy sources will utterly enhance a more active use of the RPT plants. More active use of the RPT plants means more frequent starts and stops, both in pumping and in turbine mode. There are a lot of challenges in adopting a new strategy for operating the machinery. More effective start equipment is required. The machinery will be exposed to more frequent dynamic loads; the turbines will be run at part- and full load. The existing RPT plants are connected to huge reservoirs. That means the RPTs are not only for short sighted power regulations, as many RPT-plants in Europe, but are also capable for a substantial energy production. In Norway, the nature is very suitable for RPT plants, both in connection with existing power plants, were reservoirs and conduits are already established, and standing alone with a minimum of energy production. RPTs are, as a design, a compromise between effective generating and stable as well as effective pumping. Stable pumping often results in very steep flow-speed characteristics when operating as a turbine. When dealing with hydraulic transients these characteristics cause a higher change in flow and torque leading to instability during start-up and possible off-design operation point. The instability slows down the synchronization

  20. [Ontario Hydro]. Corporate performance report, 1994

    International Nuclear Information System (INIS)

    1995-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in 1993, beginning with overall results in such areas as customer service, environmental stewardship, human resources, and finance. This is followed by reports from the Generation Business Group, Customer Services Group, Corporate Business Group, General Counsel and Secretary, Ontario Hydro Audit, Strategic Planning, Environment and Communication Group, and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix includes summary financial statements

  1. In the spotlight: New hydro development in North America

    International Nuclear Information System (INIS)

    Barnes, M.J.

    1993-01-01

    1992 was a year of progress for many segments of the hydropower industry as developers worked to bring new projects on line. This industry overview features several of these projects and offers a preview of 1993 activity. The only operating privately owned hydroelectric project in Texas. The largest hydro plant in the province of Manitoba. The world's largest submersible hydroturbine-generator. These projects and others-completed and placed in service in 1992-can claim a special place in the history books. For each of the 31 hydro projects in North America that began operating in 1992, there's a unique story to tell. Each called upon the time, talent, commitment, ingenuity, and perseverance of those involved in their development. In aggregate, these projects contribute nearly 3,800 MW of clean, renewable electrical capacity that can be used efficiently and cost-effectively to help meet the power demands of customers in the US and Canada. Utilities, state agencies, municipalities, and independent power developers played roles in developing new hydro in 1992. We offer a sampling of their work to illustrate progress made in the past year

  2. Dynamics analysis of the fast-slow hydro-turbine governing system with different time-scale coupling

    Science.gov (United States)

    Zhang, Hao; Chen, Diyi; Wu, Changzhi; Wang, Xiangyu

    2018-01-01

    Multi-time scales modeling of hydro-turbine governing system is crucial in precise modeling of hydropower plant and provides support for the stability analysis of the system. Considering the inertia and response time of the hydraulic servo system, the hydro-turbine governing system is transformed into the fast-slow hydro-turbine governing system. The effects of the time-scale on the dynamical behavior of the system are analyzed and the fast-slow dynamical behaviors of the system are investigated with different time-scale. Furthermore, the theoretical analysis of the stable regions is presented. The influences of the time-scale on the stable region are analyzed by simulation. The simulation results prove the correctness of the theoretical analysis. More importantly, the methods and results of this paper provide a perspective to multi-time scales modeling of hydro-turbine governing system and contribute to the optimization analysis and control of the system.

  3. Inventory studies of hydroelectric power plants: the methodological differences for small and large power plants; Estudos de inventario de usinas hidreletricas: as diferencas metodologicas para pequenas e grandes centrais

    Energy Technology Data Exchange (ETDEWEB)

    Bajay, Sergio Valdir [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica. Dept. de Energia; Martinez, Carlos Barreira [Faculdade de Engenharia Civil de Itajuba, MG (Brazil)

    1992-12-31

    The hydroelectric potential handbook produced by ELETROBRAS provides procedures to guides the hydro power studies of river sites. In this paper, a critical analysis of these procedures is carried out, for both large and small hydro power plants, pin pointing the plant`s planning/design interface there, several proposals are put forward in the order to adapt these procedures to small hydro plants, optimizing their planning and design for the several situation, found in Brazilian reality. (author) 5 refs.

  4. Small-scale hydro-power plant in Quinto - Preliminary project; Progetto minicentrale idroelettrica, Ri Secco - Quinto. Programma piccole centrali idrauliche. Progetto di massima

    Energy Technology Data Exchange (ETDEWEB)

    Dotti, R. [Reali e Guscetti SA, Ambri (Switzerland); Rosselli, P. [Celio Engineering SA, Ambri (Switzerland)

    2009-06-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the alpine stream 'Ri Secco' in the municipality of Quinto, southern Switzerland. The Ri Secco partly flows in a steep canyon. The elevation difference of 810 or 620 m (depending on the location of the water deviation from the stream) is favorable to the installation of a small-scale high-head power plant. The report presents details on the hydrological data and the dimensioning of the installation. Several variants are considered, which also include two possible penstock diameters for each weir location. The electricity production expected is discussed, as is the economic viability of the project.

  5. Manitoba Hydro-Electric Board 52. annual report : Building as one

    International Nuclear Information System (INIS)

    2003-01-01

    A provincial Crown corporation, Manitoba Hydro serves approximately 502,000 customers throughout Manitoba with electric energy, and provides natural gas service to 251,000 customers in several communities in southern Manitoba. In addition, Manitoba Hydro exports electricity to electric utilities and marketers in the mid-western United States, Ontario, and Saskatchewan. In 2002, Winnipeg Hydro was purchased from the City of Winnipeg. Records were broken for historical peak demand for electricity (24 February 2003) and natural gas (22 January 2003). A study of wind power generation was launched, with seven sites being monitored. A Power Smart program focusing on geothermal heat pump systems also offered assistance to Manitoba homeowners. Successful conversion of the Selkirk Generating Station from coal to natural gas was achieved. In Brandon, a 260 mega watt (MW) natural gas combustion turbine plant was opened. Over $29 million in loans were issued to customers under the Home Comfort and Energy Savings Program. Electricity rates for residential customers remained unchanged, as did those for large industrial customers. Approval was received by the National Energy Board to export 500 MW of electricity to Northern States Power. A new international interconnection was brought into service in November 2002 between Glenboro, Manitoba and Harvey, North Dakota. The ISO 14001 international certification for environmental management systems was awarded to Manitoba Hydro. tabs., figs

  6. Micro Hydro-Electric Energy Generation- An Overview

    OpenAIRE

    S. O. Anaza; M. S. Abdulazeez; Y. A. Yisah; Y. O. Yusuf; B. U. Salawu; S. U. Momoh

    2017-01-01

    Energy is required now more than ever due to population growth, industrialization and modernization. Challenges such as carbon dioxide (CO2) emissions and depletion of conventional source of energy necessitate for renewable sources, of which hydro energy seems to be the most predictable. Micro-hydro which is hydro energy in a “small” scale provides electricity to small communities by converting hydro energy into electrical energy. This paper is an overview of micro-hydro system by reviewing s...

  7. Analysis and assessment of environmental impacts of small hydro power plant in Slovakia

    Science.gov (United States)

    Zeleňáková, M.; Fijko, R.; Remeňáková, I.

    2017-10-01

    Environmental impact assessment (EIA) is an important process that, prior to approval of the investment plan, can provide a detailed examination of the likely and foreseeable impacts of proposed construction activity on the environment. The objective of this paper is to apply a specific methodology for the analysis and evaluation of the environmental impacts of selected constructions, namely, small hydro power plant, using matrix of impacts. This analysis method is intended not only to increase the clarity and precision of the evaluation process, but also to align it with the requirements of the environmental impact assessment system. This modification should improve the reliability of the environmental impact assessment, and could moreover also be applied to other infrastructure projects. Comparison of alternatives and designation of the optimal variant are implemented based on selected criteria that objectively describe the characteristic lines of the planned alternatives of activity and their impact on the environment. The use of proper EIA procedures can help the decision-makers to formulate proper activities based on qualified decisions. The designed project in Spišské Bystré, Slovakia is used as a case study to clarify and exemplify the methodology and techniques.

  8. Bioluminescent Bioreporter Pseudomonas putida TVA8 as a Detector of Water Pollution. Operational Conditions and Selectivity of Free Cells Sensor

    Czech Academy of Sciences Publication Activity Database

    Kuncová, Gabriela; Pazlarová, J.; Hlavatá, Alena; Ripp, S.; Sayler, G.S.

    2011-01-01

    Roč. 11, č. 3 (2011), s. 882-887 ISSN 1470-160X R&D Projects: GA MŠk ME 893 Institutional research plan: CEZ:AV0Z40720504 Keywords : whole-cell biosensor * bioluminiscence * pseudomonas putida TVA8 Subject RIV: EI - Biotechnology ; Bionics Impact factor: 2.695, year: 2011

  9. Effet de l'extrait hydro-éthanolique des feuilles de Trilepisium ...

    African Journals Online (AJOL)

    apparition de plusieurs complications du diabète (hypertension artérielle, cataracte, insuffisance rénale,…). C'est ainsi que, la présente étude a été entreprise pour évaluer l'effet antioxydant de l'extrait hydro-éthanolique de cette plante chez les ...

  10. Alternative off-site power supply improves nuclear power plant safety

    International Nuclear Information System (INIS)

    Gjorgiev, Blaže; Volkanovski, Andrija; Kančev, Duško; Čepin, Marko

    2014-01-01

    Highlights: • Additional power supply for mitigation of the station blackout event in NPP is used. • A hydro power plant is considered as an off-site alternative power supply. • An upgrade of the probabilistic safety assessment from its traditional use is made. • The obtained results show improvement of nuclear power plant safety. - Abstract: A reliable power system is important for safe operation of the nuclear power plants. The station blackout event is of great importance for nuclear power plant safety. This event is caused by the loss of all alternating current power supply to the safety and non-safety buses of the nuclear power plant. In this study an independent electrical connection between a pumped-storage hydro power plant and a nuclear power plant is assumed as a standpoint for safety and reliability analysis. The pumped-storage hydro power plant is considered as an alternative power supply. The connection with conventional accumulation type of hydro power plant is analysed in addition. The objective of this paper is to investigate the improvement of nuclear power plant safety resulting from the consideration of the alternative power supplies. The safety of the nuclear power plant is analysed through the core damage frequency, a risk measure assess by the probabilistic safety assessment. The presented method upgrades the probabilistic safety assessment from its common traditional use in sense that it considers non-plant sited systems. The obtained results show significant decrease of the core damage frequency, indicating improvement of nuclear safety if hydro power plant is introduced as an alternative off-site power source

  11. Aquatic Plant Management Program current status and seasonal workplan

    Energy Technology Data Exchange (ETDEWEB)

    Burns, E.R.; Bates, A.L.; Webb, D.H.

    1993-07-01

    The objective of the TVA Aquatic Plant Management Program is to support in an environmentally and economically responsible manner, the balanced multiple uses of the water resource of the Tennessee Valley. This is accomplished by following an integrated approach to prevent introduction and spread of noxious species, documenting occurrence and spread of existing species, and suppressing or eliminating problems in designated high use areas. It is not the TVA objective, nor is it biologically feasible and prudent to eliminate all aquatic vegetation. Aerial photography, helicopter reconnaissance, and field surveys are used to assess distributions and abundance of various aquatic macrophytes. Water level fluctuations are supplemented by herbicide applications to control undesirable vegetation. Investigations are conducted to evaluate water level fluctuation schemes, as well as biological, mechanical, and alternative chemical control techniques which offer potential for more environmentally compatible and cost-effective management operations.

  12. Realisation of a small hydro power plant in the new water reservoir of the water supply of the San Abbondio municipality; Realizzazione di una microcentrale nel nuovo serbatoio dell'acquedotto del comune di S. Abbondio. Progetto definitivo nuovo serbatoio. Progetto di massima e studio varianti microcentrale

    Energy Technology Data Exchange (ETDEWEB)

    Conti, M.

    2008-12-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the construction project of a new water reservoir including a micro-scale hydro power plant in the drinking-water supply of the municipality of San Abbondio, Switzerland. Following the development of residential areas a new water reservoir located at higher elevation is needed. A former preliminary study had demonstrated the feasibility of a micro-scale hydro power plant in the water supply. The adaptation of the plant design to the new situation is described. Investment cost is estimated and several variants are compared. Recommendations are given to the authorities.

  13. Short-term regulation of hydro powerplants. Studies on the environmental effects

    International Nuclear Information System (INIS)

    Sinisalmi, T.; Riihimaeki, J.; Vehanen, T.; Yrjaenae, T.

    1997-01-01

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs

  14. Short-term regulation of hydro powerplants. Studies on the environmental effects

    Energy Technology Data Exchange (ETDEWEB)

    Sinisalmi, T. [ed.; Forsius, J.; Muotka, J.; Soimakallio, H. [Imatran Voima Oy, Vantaa (Finland); Riihimaeki, J. [VTT, Espoo (Finland); Vehanen, T. [Finnish Game and Fisheries Research Inst. (Finland); Yrjaenae, T. [North Ostrobothnia Regional Environmental Centre, Oulu (Finland)

    1997-12-31

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs.

  15. Training of nuclear power plant personnel in Canada

    International Nuclear Information System (INIS)

    Tennant, D.

    1993-01-01

    All of the utilities, Ontario Hydro, Hydro Quebec and New Brunswick Power, operating Nuclear Power Plants in Canada have Training Centres which provide training for all of their plant personnel whose job activities could affect plant and personnel safety. This report points out the methods used for training, which generally conform to that described by the IAEA as a Systematic Approach to Training (SAT)

  16. Invitro Anti-mycotic Activity of Hydro Alcoholic Extracts of Some Indian Medicinal Plants against Fluconazole Resistant Candida albicans.

    Science.gov (United States)

    Varadarajan, Saranya; Narasimhan, Malathi; Malaisamy, Malaiyandi; Duraipandian, Chamundeeswari

    2015-08-01

    Candidiasis is one of the most common opportunistic infections caused by Candida albicans. Fluconazole is the drug of choice for prevention and management of this condition. However, the emergence of fluconazole resistant candidal strains has become a major concern. Many herbs like fenugreek, cinnamon, papaya, oregano, garlic are rich in phytochemical constituents known to express antimycotic activity. With the available information, the present research study was carried out to assess the invitro anti-mycotic activity of hydro alcoholic extracts of Trigonella foenum-graecum seeds, Cinnamomum verum bark and Carica papaya leaves and seeds against fluconazole resistant Candida albicans. Hydro alcoholic extracts of Trigonella foenum-graecum (seeds), Cinnamomum verum (bark), Carica papaya CO.2 strain (male and female leaves) and Carica papaya CO.2 strain (seeds) were prepared by maceration. The anti-mycotic activity of the prepared extracts against Candida albicans was assessed by agar well diffusion method. Three independent experiments were performed in triplicates and the mean and standard deviation were calculated. Minimum inhibitory concentration was determined. The results of the present study revealed that all the extracts exhibited anti-mycotic activity in a dose dependent manner and minimum inhibitory concentration of all the extracts was found to be 15.62 μg/ml. The results of the present study shed light on the fact that plant extracts could be used not only as an alternate drug for management of fluconazole resistant candidiasis but also explored further for oral cancer prevention as a therapeutic adjunct.

  17. The Properties of Binary and Ternary Ti Based Coatings Produced by Thermionic Vacuum Arc (TVA Technology

    Directory of Open Access Journals (Sweden)

    Aurelia Mandes

    2018-03-01

    Full Text Available A series of the multicomponent thin films (binary: Ti-C; Ti-Ag and ternary: Ti-C-Ag; Ti-C-Al were fabricated by Thermionic Vacuum Arc (TVA technology in order to study the wear resistance and the anticorrosion properties. The effects of Ti amount on the microstructure, tribological and morphological properties were subsequently investigated. TVA is an original deposition method using a combination of anodic arc and electron gun systems for the growth of films. The samples were characterized using scanning electron microscope (SEM and a transmission electron microscope (TEM accompanied by selected area electron diffraction (SAED. Tribological properties were studied by a ball-on-disc tribometer in the dry regime and the wettability was assessed by measuring the contact angle with the See System apparatus. Wear Rate results indicate an improved sliding wear behavior for Ti-C-Ag: 1.31 × 10−7 mm3/N m (F = 2 N compared to Ti-C-Al coating wear rate: 4.24 × 10−7 mm3/N m. On the other hand, by increasing the normal load to 3 N an increase to the wear rate was observed for Ti-C-Ag: 2.58 × 10−5 mm3 compared to 2.33 × 10−6 mm3 for Ti-C-Al coating.

  18. Hydro Power Reservoir Aggregation via Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Markus Löschenbrand

    2017-12-01

    Full Text Available Electrical power systems with a high share of hydro power in their generation portfolio tend to display distinct behavior. Low generation cost and the possibility of peak shaving create a high amount of flexibility. However, stochastic influences such as precipitation and external market effects create uncertainty and thus establish a wide range of potential outcomes. Therefore, optimal generation scheduling is a key factor to successful operation of hydro power dominated systems. This paper aims to bridge the gap between scheduling on large-scale (e.g., national and small scale (e.g., a single river basin levels, by applying a multi-objective master/sub-problem framework supported by genetic algorithms. A real-life case study from southern Norway is used to assess the validity of the method and give a proof of concept. The introduced method can be applied to efficiently integrate complex stochastic sub-models into Virtual Power Plants and thus reduce the computational complexity of large-scale models whilst minimizing the loss of information.

  19. Refurbishment of small hydropower plants in Romania; Sanierung von Kleinwasserkraftwerken in Rumaenien

    Energy Technology Data Exchange (ETDEWEB)

    Gmeinbauer, Joerg [Wien Energie GmbH, Wien (Austria)

    2010-07-01

    In 2008 Wien Energie subsidiary Wienstrom GmbH participated in three public auctions of Hidroelectrica S.A. for the sale of old small hydro power plants in Romania. Together with strategic partners Wienstrom could successfully compete against local and international competition and acquired 31 small hydro power plants with a total installed capacity of around 20 MW. The plants were integrated into the newly established Vienna Energy Forta Naturala Srl. and are being completely refurbished at the moment. Wien Energie consequently is already the third largest operator of small hydro power plants in Romania. (orig.)

  20. Perceived risk of nuclear and hydro electrical power generation in Colombia

    International Nuclear Information System (INIS)

    Munera, H.A.

    1982-12-01

    This report deals with the estimation of risk factors of hydro plants and the perception of risks and benefits of nuclear, hydropower and coal by a selected part of the public. Historical data (1922 - 1979) on occurrence of earthquakes in Colombia demonstrate high seismicity (3,489 incidents) for the country in total and also for areas where the majority of hydro projects are to be located. Model-based calculations of regional probabilities for earthquakes at prospective dam-sites with a magnitude of 7 (Richter scale) or larger resulted in p=0.038/year for a 50 year recurrence period for high and p=0.0004/year for low seismicity areas. Attitudes towards three energy systems were elicited from 130 university students and graduates with a questionnaire based on a psychometric model. Generally attitudes were most favourable towards hydro, less favourable towards coal and more critical towards nuclear. Nuclear is perceived to have economic advantages, but to pose environmental, individual and societal risks. Respondents PRO and CON nuclear agree on the lack of risk from hydropower

  1. Reporting on nuclear power: the Tennessee Valley case

    International Nuclear Information System (INIS)

    Shapley, D.

    1977-01-01

    The Tennessee Valley Authority (TVA), by deciding to have 90 percent of its new generating capacity nuclear, has made the valley a testing ground for civilian nuclear power, but valley newspapers have not provided consumers with enough information on either the pros or cons. A 1975 Browns Ferry plant fire, the most serious in the history of the civilian nuclear industry, prompted some nuclear critics to question TVA's competence to plan and manage the program. Newspapers carried wire-service stories of the fire, while their editorials gave strong support to TVA and the effort to reopen the plant. Valley newspapers have traditionally favored TVA as a powerful economic and political force which has brought many benefits. Local pride in the Oak Ridge Laboratory and plant facilities and the Federal fast-breeder reactor project headquarters also enhanced the positive attitude of the press, which tended to report details but not question nuclear safety or TVA ability. Newspapers have also failed to question TVA's claims that rates will decline as nuclear plants begin operating. A review of relevant news stories during the 1975--1976 period addresses the press coverage and notes its failure to question whether power demands justify TVA's plant construction program. Knowledgeable consultants are available to provide information on the issues, while editors are advised to give comprehensive, critical coverage and avoid promotion

  2. BC hydro: Annual report, 1991-1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The third largest electric utility in Canada, B.C. Hydro services almost 1.3 million customers in an area containing over 92 per cent of British Columbia's population. B.C. Hydro's mission is to generate, transmit and distribute electricity. This annual report covers the business and financial performance of B.C. Hydro, and financial statistics.

  3. Analyze the factors effecting the development of hydro power projects in hydro rich regions of India

    Directory of Open Access Journals (Sweden)

    Ameesh Kumar Sharma

    2016-09-01

    Full Text Available Power is considered as the major back bone for all the nations throughout the world including India on the basis of which development of the country depends. If a country has the resources to generate the power at competitive price in that case the people of the country get the benefits in terms of improvement in their social and economical life. When we talk about India, various locations in the country where still there is no electricity people are living in dark without having the access of the modern technology. The total hydro power potential of India is 1, 50,000 MW out of this total hydro potential only 40,195 MW is exploited till 2014. More than 80% of the total hydro potential of the country is lying in the western Himalayan states (Jammu and Kashmir, Himachal Pradesh, Uttrakhand and Arunachal Pradesh. Small hydro projects are also playing a very important role in the modern world for the development of the remote areas which are not main grid connected specially in western Himalayan region of India. India has a total potential 19,749 MW of small hydro projects and of this total potential only 3990.9 MW harnessed till 2014. Ministry of new and renewable energy in India is also providing special incentives to hydro rich states of India. In this research article we are taken the case study of the small hydro projects in the western Himalayan region because theses states are having vast small hydro potential which is still needed to be harnessed. So, it is very important to identify the factors which are effecting the development of these small ventures especially in western Himalayan region in India.

  4. Hydro-Quebec strategic plan 2006-2010

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec produces, transmits and distributes electricity through the use of renewable energy sources, particularly hydroelectricity. It also conducts research in energy related fields. This document listed the strategic plan for Hydro-Quebec's 4 main divisions: Hydro-Quebec Production, Hydro-Quebec TransEnergie, Hydro-Quebec Distribution and Hydro-Quebec Energy Society of Bay James. The 2006 to 2010 strategic plan continues to focus on 3 main priorities: energy efficiency; complementary development of hydroelectricity and wind power; and, technological innovation. Hydro-Quebec's objectives also include strengthening the security of Quebec's energy supply and making use of energy as a lever for economic development. The plan for Hydro-Quebec Production calls for accelerating the development of major hydroelectric projects and promoting other renewable forms of energy such as wind power and ensuring the efficiency and reliability of the generating fleet. The utility's objective is to reach 4.7 TWh in energy savings by 2010 and to work toward a target of 8 TWh by 2015. The plan also involves a portfolio of hydroelectric projects totaling 5,400 MW. The plan includes complementary development and integration of 4,000 MW of windpower by 2015. The plan for Hydro-Quebec TransEnergie calls for system reliability and becoming a world benchmark for quality and reliability in wind power integration and deployment of new technologies to enhance performance. The plan for Hydro-Quebec Distribution calls for more efficient use of electricity, increase customer satisfaction and meet electricity needs through the use of renewable energy sources. The utility has made a commitment for 2006 to 2010 to a net income of $2.5 billion per year for a total of $12.5 billion, and a capital investment of 19.4 billion. This paper outlined the contribution of each division to net income and listed the economic benefits for the 2006 to 2010 period. In 2006, the Quebec Energy Board authorized

  5. Hydro-power: a long history, a bright future

    Energy Technology Data Exchange (ETDEWEB)

    Deudney, D

    1981-07-01

    A brief history of the spread of hydro-power in the world was given. Tables showing hydro-power potential and use, and the % electricity from hydro-power for 13 countries were included along with a graph showing % hydro-power operating, planned and under construction by region. The need for committed and farsighted political leadership for future development and the possibility of hydro production reaching 4 to 6 times its present level were discussed.

  6. 77 FR 77070 - Black Bear Hydro Partners, LLC;

    Science.gov (United States)

    2012-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2727-086] Black Bear Hydro...: October 24, 2012. d. Submitted By: Black Bear Hydro Partners, LLC (Black Bear Hydro). e. Name of Project... designating Black Bear Hydro as the Commission's non-federal representative for carrying out informal...

  7. [Ontario Hydro]. Corporate performance report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values established in the approved corporate financial plan and work program budget. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in mid-1993, beginning with overall results in such areas as customer satisfaction, electricity sales, human resources, and environmental protection. This is followed by reports from the Electricity Group (supply, generation, transmission), the Energy Services and Environment Group (load saved and shifted, non-utility generation, retail distribution), and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix contains summary financial statements

  8. Rainfall prediction using fuzzy inference system for preliminary micro-hydro power plant planning

    Science.gov (United States)

    Suprapty, B.; Malani, R.; Minardi, J.

    2018-04-01

    East Kalimantan is a very rich area with water sources, in the form of river streams that branch to the remote areas. The conditions of natural potency like this become alternative solution for area that has not been reached by the availability of electric energy from State Electricity Company. The river water in selected location (catchment area) which is channelled to the canal, pipeline or penstock can be used to drive the waterwheel or turbine. The amount of power obtained depends on the volume/water discharge and headwater (the effective height between the reservoir and the turbine). The water discharge is strongly influenced by the amount of rainfall. Rainfall is the amount of water falling on the flat surface for a certain period measured, in units of mm3, above the horizontal surface in the absence of evaporation, run-off and infiltration. In this study, the prediction of rainfall is done in the area of East Kalimantan which has 13 watersheds which, in principle, have the potential for the construction of Micro Hydro Power Plant. Rainfall time series data is modelled by using AR (Auto Regressive) Model based on FIS (Fuzzy Inference System). The FIS structure of the training results is then used to predict the next two years rainfall.

  9. Standardized CSR and climate performance: why is Shell willing, but Hydro reluctant?; Shell; Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Boasson, Elin Lerum; Wettestad, Joergen

    2007-06-15

    This report aims to contribute to the ongoing discussion concerning whether CSR merely serves to streamline company rhetoric or also has an influence on actual efforts. We discuss the tangible effects of CSR instruments on the climate-related rules and performances of the two different oil companies Hydro and Shell. First we explore whether similar CSR instruments lead to similar climate-related rules and practices in the two companies. Both Hydro and Shell adhere to the Global Compact (GC), the Global Reporting Initiative (GRI), the Carbon Disclosure Project (CDP) and the Global Gas Flaring Reduction Public-Private Partnership (GGFR). The report concludes that the GC has not rendered any tangible effects in either of the companies. Concerning the other instruments, Hydro has only followed the instrument requirements that fit their initial approach, and refrained from all deviating requirements. Shell has been more malleable, but we have noted few effects on the actual emissions and business portfolio resulting from the instrument adherence. Second, we assess how the differing results of the similar CSR portfolio may be explained. The reluctant attitude of the leaders in Hydro and the strong CSR motivation of Shell's executives result in significant differences. Hydro executives are able to constrain the effects of the instrument adherence. With Shell we note the opposite pattern: Its leaders promoted the instruments to be translated into internal rules, but a general lack of hierarchical structures hinders them from governing the conduct of various sub-organisations. The very diversity of the Shell culture helps to explain why the efforts of its executives have resulted in limited impact. The strength of the Hydro culture makes the corporation resistant to the instruments. Moreover, Hydro is strikingly shielded by virtue of its strong position in Norway. In contrast, Shell is more strongly affected by the global field of petroleum and the global field of CSR

  10. Good prospects for Portuguese small hydro industry

    International Nuclear Information System (INIS)

    Betamio de Almeida, A.; Serranho, H.

    2000-01-01

    The article outlines the history of hydro in Portugal and discusses the current position of small-scale hydro with particular reference to the Portuguese Small Hydro Association (AMPH). Encouraged by legislation, and the Valoren community programme (which defined investment incentives), many new small hydro projects sprang up in Portugal in the 1990s. In some areas of Portugal the water levels were higher than the urban centres where the water is required: how the problems of integrating power and water were addressed is described. The integration of power and irrigation schemes is also mentioned. In the wake of great expansion in the Portuguese hydro industry, there was a sharp reduction (in 1995-6) and the reasons for that are listed. The 1999 tariff was such that it is likely that small hydro will provide 3.8% of the electric power consumed nationally by 2010

  11. Hydro-energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Bacher, P. [Electricite de France (EDF), 75 - Paris (France); Tardieu, B. [Coyne et Bellier, 92 - Gennevilliers (France)

    2005-07-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  12. Making the connection: The B.C. Hydro electric system and how it is operated

    International Nuclear Information System (INIS)

    1993-01-01

    British Columbia Hydro supplies electric energy to 93% of the province's population through an integrated electric system. Of the electricity supplied, 95% is generated at 29 hydroelectric plants, with the remainder coming from thermal plants burning fossil fuels. BC Hydro's high voltage transmission and distribution network consists of 17,600 km of lines 60 kV and above and 51,400 km of lines below 60 kV. A description of system operations begins with the principles of hydroelectric generation, with a brief note on thermal generation for peaking or short-term energy production. Non-power operations measures designed to minimize environmental impacts and enhance social benefits are also outlined along with electricity trade with other provinces and the USA. Planning of long- and short-term system operations is also reviewed. An analysis of system components is presented for the Peace, Columbia, Lower Mainland/Coastal/Fraser, and Vancouver Island regions. Finally, information is given on the 29 hydroelectric and 3 thermal plants, including drainage basin, reservoir description and map, inflow, capacity, turbine type, storage, operating constraints, and average energy capability. 51 figs

  13. Hydro operational restrictions forum: Licensee workshop summary. Final report

    International Nuclear Information System (INIS)

    Ebrahim, S.; Monahan, C.K.; Pistor, B.; West, A.

    1998-08-01

    In spite of producing no atmospheric pollutants, hydroelectric power plants often go unrecognized as a unique provider of clean, efficient, low-cost energy. A concerted effort is needed to ensure that these attributes are fully accounted for when considering the uses and benefits of available water resources. Relicensing reviews and other regulatory activities associated with continued operation of hydro generation projects have drawn increased attention to hydro resources. This attention has typically resulted in imposition of conditions having a substantial cost impact without, necessarily, reflecting a full appreciation of the resource's benefits and attributes. With the extensive countrywide effort in relicensing and regulation, there is an opportunity to collect and compile lessons learned. This is particularly true with respect to preferred practices, technologies, and techniques applicable to required studies and mitigation measures. Such compilation will enable the industry and related stakeholders to improve quality and effectiveness while reducing costs of relicensing and mitigation for continued hydro operations. As a technology leader for the industry, EPRI is in a unique position to identify and document these techniques and practices. This report comprises the proceedings of the hydro licensees workshop. Fifteen licensee representatives with recent or current involvement in the relicensing process gathered at this workshop and shared their experiences, both good and bad. Support was strong among attendees for EPRI's effort to collect and compile these, along with the experiences of others, into a guidebook of accepted practices. Initial workshop findings were used in the second workshop to solicit buy-in from agencies and NGOs to the need for--as well as proposed scope of--a compendium of preferred practices

  14. 76 FR 55723 - Final Supplemental Environmental Impact Statement, Sequoyah Nuclear Plant Units 1 and 2 License...

    Science.gov (United States)

    2011-09-08

    ...-basis accident or severe accident is minor, and that the results of such accidents continue to be... the Fukushima accident is unlikely to occur at any TVA plant. Nonetheless, the effort has resulted in... the Fukushima Dai-ichi Accident, concluded that continued operation and continued licensing activities...

  15. An overview on small hydro in Brazil

    International Nuclear Information System (INIS)

    Filho, G.T.

    2008-01-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km 2 . It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  16. Hydro-power

    International Nuclear Information System (INIS)

    Piro, P.

    2010-01-01

    On average the hydro-power sector produces 12% of the electrical power in France. A quarter of this production might pass to another operator than EDF because the end of some grants is nearing (2012 for 12 installations). In France the power of rivers belongs to the state that gives operators grants to harness it. The allowance lasts 75 years usually but for installations below 4.5 MW a permanent and definitive grant is allowed. Most installations are ancient and their investment have been paid off since a long, so hydro-power is the most profitable renewable energy in France. A lot of bidders are expected. Each bid will be assessed on 3 criteria: -) the global energy efficiency of the waterfall, -) a balanced management of the water resource, and -) an economic and financial offer to the state. The balance between the different uses of water is getting more delicate to reach and this renewal of grants will be an opportunity for the state to impose a better preservation of the environment. In July 2008, the French government announced a program for the re launching of the hydro-power, this program has been reduced and now only 3000 GWh supplementary are expected by 2020. (A.C.)

  17. Ontario Hydro's experience in implementing on-the-job training for chemical technicians

    International Nuclear Information System (INIS)

    Cooper, G.A.

    1996-01-01

    Since 1989, Ontario Hydro Nuclear has been developing and implementing formalized On-the-Job Training for qualifying its nuclear power plant chemical laboratory staff. This paper focuses on the process followed in designing, developing and implementing this training, with emphasis on the strengths and weaknesses of the program. 7 refs, 3 figs

  18. Short-term hydro generation scheduling of Three Gorges–Gezhouba cascaded hydropower plants using hybrid MACS-ADE approach

    International Nuclear Information System (INIS)

    Mo, Li; Lu, Peng; Wang, Chao; Zhou, Jianzhong

    2013-01-01

    Highlights: • MACS and ADE algorithms are hybridized as MACS-ADE method for solving STHGS problem. • An adaptive mutation is integrated into the proposed algorithm to avoid premature convergence. • MACS and ADE are run in parallel in search of better solution. • Several effective heuristic strategies are designed for dealing with various constraints of STHGS problem. - Abstract: Short-term hydro generation scheduling (STHGS) aims at determining optimal hydro generation scheduling to obtain minimum water consumption for one day or week while meeting various system constraints. In this paper, the STHGS problem is decomposed into two sub-problems: (i) unit commitment (UC) sub-problem; (ii) economic load dispatch (ELD) sub-problem. Then, we present a hybrid algorithm based on multi ant colony system (MACS) and differential evolution (DE) for solving the STHGS problem. First, MACS is used for dealing with UC sub-problem. A set of cooperating ant colonies cooperate to choose the unit state over the scheduled time horizon. Then, the adaptive differential evolution (ADE) is used to solve ELD sub-problem. MACS and ADE are run in parallel with adjusting their solutions in search of a better solution. Meanwhile, local and global pheromone updating rules in MACS and adaptive dynamic parameter adjusting strategy in DE are applied for enhancing the search ability of MACS-ADE. Finally, the proposed method is implemented to solve STHGS problem of Three Gorges–Gezhouba cascaded hydropower plants to verify the feasibility and effectiveness. Compared with other established methods, the simulation results reveal that the proposed MACS-ADE approach has the best convergence property, computational efficiency with less water consumption

  19. Hydro-Thermal-Wind Generation Scheduling Considering Economic and Environmental Factors Using Heuristic Algorithms

    Directory of Open Access Journals (Sweden)

    Suresh K. Damodaran

    2018-02-01

    Full Text Available Hydro-thermal-wind generation scheduling (HTWGS with economic and environmental factors is a multi-objective complex nonlinear power system optimization problem with many equality and inequality constraints. The objective of the problem is to generate an hour-by-hour optimum schedule of hydro-thermal-wind power plants to attain the least emission of pollutants from thermal plants and a reduced generation cost of thermal and wind plants for a 24-h period, satisfying the system constraints. The paper presents a detailed framework of the HTWGS problem and proposes a modified particle swarm optimization (MPSO algorithm for evolving a solution. The competency of selected heuristic algorithms, representing different heuristic groups, viz. the binary coded genetic algorithm (BCGA, particle swarm optimization (PSO, improved harmony search (IHS, and JAYA algorithm, for searching for an optimal solution to HTWGS considering economic and environmental factors was investigated in a trial system consisting of a multi-stream cascaded system with four reservoirs, three thermal plants, and two wind plants. Appropriate mathematical models were used for representing the water discharge, generation cost, and pollutant emission of respective power plants incorporated in the system. Statistical analysis was performed to check the consistency and reliability of the proposed algorithm. The simulation results indicated that the proposed MPSO algorithm provided a better solution to the problem of HTWGS, with a reduced generation cost and the least emission, when compared with the other heuristic algorithms considered.

  20. BC Hydro - IPC review : report on the creation of IPC International Power Corporation and its joint venture with the British Columbia Hydro and Power Authority for the Raiwind power project

    International Nuclear Information System (INIS)

    1997-03-01

    BC Hydro is one of the sponsors involved in the construction of a thermal electric power plant in Raiwind, Pakistan. As a Crown corporation, BC Hydro and its participation in the project is subject to the policies and priorities of the provincial government. This document describes the circumstances surrounding the creation of the International Power Corporation (IPC) and its joint venture with BC Hydro for the development of international power projects including the Raiwind project. The project has provoked much public discussion in British Columbia because of the involvement of Cayman Island companies in the project structure. There is concern with the intermingling of public and private interests in the project, including allegations that an IPC share offering benefited insiders of government and BC Hydro. A description of the history and structure of the Raiwind project and detailed information on the British Columbia participants is provided. Directors and shareholders of the principal corporate participants are listed. The development process in Pakistan, the key features of the project and the underlying agreements among the participants are described. An assessment of potential conflicts of interest and a review of public sector standards and guidelines regarding conflicts of interest is presented. 60 refs., 39 tabs., 6 figs

  1. Lessons Learned after Nuclear Power Plants and Hydropower Plants Accidents

    Energy Technology Data Exchange (ETDEWEB)

    Moskalenko, A., E-mail: gce@gce.ru [GCE Group, Saint Petersburg (Russian Federation)

    2014-10-15

    Full text: The World is becoming more open and free for communication. However, the experience (positive or negative) is still badly cross over sectorial borders. I would like to illustrate the point with the examples, even with several unexpected ones. I would like to start with a few words regarding the Sayano – Shushenskaya Hydro Power Plant accident and the factors that caused it. Sayano – Shushenskaya Hydro Power Plant is a unique Hydro Power Plant with efficiency factor of 96 %. Nevertheless, the efficiency factor, in particular, caused a series of restrictions: hydro-electric units vibration amplitude must not exceed 4 micron!!! (Slide 1: Vibration amplitude dependence on output capacity) As it is clearly seen, there is a so called “prohibited area”, which the hydro-electric unit must pass over. Operations in the area are prohibited in accordance with the regulatory documents. However, due to the changes that occurred in Russian power supply industry, the hydro-electric unit passed through the prohibited area more than 12 times, if we take into account only the day of the accident. The bolts keeping the turbine cover, keeping water apart from the machinery hall, were too much released. The mentioned above reasons led to the hydro-electric unit disruption and the machinery hall flooding. Water inflow was possible to stop by putting down the regulating valves. However, the regulating valves control console was in the flooded machinery hall. There was standby emergency control console, but it was in the machinery hall, as well. The machinery hall was flooded, consequently, main and standby systems were destroyed. Moreover, the machinery hall, where all the units were disposed, was a huge hall without dividing walls, etc. (Photo) Take a look at the next slide. (Photo – Chernobyl Nuclear Power Plant machinery hall). Take note of Fukushima–1 Nuclear Power Plant: standby power supply source was situated in the same place and destroyed by water. All the

  2. Some hydrogen-control considerations for ice-condenser nuclear plants

    International Nuclear Information System (INIS)

    Hubbard, H.W.; Hammond, R.P.; Zivi, S.M.

    1981-02-01

    The proposal of the Tennessee Valley Authority (TVA) for coping with the problem of accident generated hydrogen gas in its Sequoyah ice-condenser plant was to put in place glow-plug igniters so that any hydrogen that is evolved during an accident could be burnt before accumulating into a dangerously large mass. Since it was desired to install these igniters in the Sequoyah and other plants as quickly as possible, the NRC asked the Lawrence Livermore National Laboratory (LLNL) to carry out some experiments on these igniters to delineate the region of their applicability

  3. Penstock failure detection system at the 'Valsan' hydro power plant

    International Nuclear Information System (INIS)

    Georgescu, A M; Coşoiu, C I; Alboiu, N; Hlevca, D; Tataroiu, R; Popescu, O

    2012-01-01

    'Valsan' is a small Hydro Power Plant, 5 MW, situated at about 160 km north of Bucharest, Romania, on the small 'Valsan' river in a remote mountainous area. It is equipped with a single Francis turbine. The penstock is located in the access shaft of the HPP. 'Hidroelectrica', the Romanian company that operates the HPP, was trying to implement a remote penstock failure detection system. Starting from a classic hydraulic problem, the authors of the paper derived a method for failure detection and localization on the pipe. The method assumes the existence of 2 flow meters and 2 pressure transducers at the inlet and outlet of the pressurized pipe. Calculations have to be based on experimental values measured in a permanent regime for different values of the flow rate. The method was at first tested on a pipe, in the Hydraulic Laboratory of the Technical University of Civil Engineering Bucharest. Pipe failure was modelled by opening of a valve on a tee branch of the analyzed pipe. Experimental results were found to be in good agreement with theoretical ones. The penstock of the 'Valsan' HPP, was modelled in EPANET, in order to: i) test the method at a larger scale; ii) get the right flow and pressure transducers that are needed to implement it. At the request of 'Hidroelectrica' a routine that computes the efficiency of the turbine was added to the monitoring software. After the system was implemented, another series of measurements were performed at the site in order to validate it. Failure was modelled by opening an existing valve on a branch of the penstock. Detection of the failure was correct and almost instantaneous, while failure location was accurate within 5% of the total penstock length.

  4. Penstock failure detection system at the "Valsan" hydro power plant

    Science.gov (United States)

    Georgescu, A. M.; Coşoiu, C. I.; Alboiu, N.; Hlevca, D.; Tataroiu, R.; Popescu, O.

    2012-11-01

    "Valsan" is a small Hydro Power Plant, 5 MW, situated at about 160 km north of Bucharest, Romania, on the small "Valsan" river in a remote mountainous area. It is equipped with a single Francis turbine. The penstock is located in the access shaft of the HPP. "Hidroelectrica", the Romanian company that operates the HPP, was trying to implement a remote penstock failure detection system. Starting from a classic hydraulic problem, the authors of the paper derived a method for failure detection and localization on the pipe. The method assumes the existence of 2 flow meters and 2 pressure transducers at the inlet and outlet of the pressurized pipe. Calculations have to be based on experimental values measured in a permanent regime for different values of the flow rate. The method was at first tested on a pipe, in the Hydraulic Laboratory of the Technical University of Civil Engineering Bucharest. Pipe failure was modelled by opening of a valve on a tee branch of the analyzed pipe. Experimental results were found to be in good agreement with theoretical ones. The penstock of the "Valsan" HPP, was modelled in EPANET, in order to: i) test the method at a larger scale; ii) get the right flow and pressure transducers that are needed to implement it. At the request of "Hidroelectrica" a routine that computes the efficiency of the turbine was added to the monitoring software. After the system was implemented, another series of measurements were performed at the site in order to validate it. Failure was modelled by opening an existing valve on a branch of the penstock. Detection of the failure was correct and almost instantaneous, while failure location was accurate within 5% of the total penstock length.

  5. Hydro One 2002 annual report

    International Nuclear Information System (INIS)

    2003-01-01

    Financial information from Hydro One was presented and a review of its 2002 operations was made available for the benefit of shareholders. Hydro One is the largest electricity delivery company in Ontario and one of the largest in North America. It began operation in 1999 after Ontario Hydro restructured its delivery and generation entities. Hydro One now includes power transmission, power distribution and telecom, with transmission and distribution operations representing 99 per cent of its business. This report indicates that in 2002, the utility had strong financial performance with $344 million in net income. The utility met its health and safety targets, and established a customer advisory board to improve customer satisfaction. A layer of management at the executive level was eliminated to stream-line decision-making and enhance productivity. The electricity network was upgraded and maintained through $546 million in capital expenditures. Non-core functions were sold to ensure a better focus on the core business of electricity delivery. This report presents an operations review as well as consolidated financial statements and common share information including the accounts of Hydro One and its share of assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  6. Ontario Hydro annual report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    Ontario Hydro is a corporation without share capital created by a special statute of the Province of Ontario in 1906. It now operates under the authority of the Power Corporation Act, R.S.O. 1980, Chapter 384, as amended, with broad powers to generate, supply and deliver electric power throughout the province. It is also authorized to produce and sell steam and hot water as primary products. The Corporation's prime objective is to supply the people of Ontario with electricity at the lowest feasible cost consistent with high safety and quality of service standards. Ontario Hydro's main activity is wholesaling electric power to municipal utilities in urban areas who, in turn, retail it to customers in their service areas. In 1985, approximately 3,166,000 customers were served by Ontario Hydro and the municipal utilities in the province. Ontario Hydro operates 81 hydraulic, fossil and nuclear generating stations and an extensive power grid across Ontario to meet the province's demands for electric energy. Interconnections with other systems place the Corporation in an extensive electrical grid that covers a large segment of the North American continent. Ontario Hydro is a financially self-sustaining corporation. The Province of Ontario guarantees bonds and notes issued to the public by the Corporation

  7. Experimental investigation of am measures and effect of hydro-accumulator initial pressure for VVER-440 plants

    International Nuclear Information System (INIS)

    Ivan Toth; Gyorgy Ezsol; Attila Guba; Laszlo Perneczky

    2005-01-01

    Full text of publication follows: A series of experiments were performed at the PMK-2 test facility within the IMPAM-VVER project of the EU 5. Framework Programme. The PMK-2 integral-type facility is a scaled down model of the Paks NPP with a volume and power scaling of 1:2070. Transients can be started from nominal operating conditions. The ratio of elevations is 1:1 except for the lower plenum and pressurizer. The six loops of the plant are modelled by a single active loop. The main objective of the project was to address different problems encountered during the development of EOPs for the Paks NPP in Hungary. Two of the six PMK tests addressed the investigation of starting criteria for primary and secondary bleed during a small break LOCA without HPIS: - a 'base case', with bleed actions following the plant procedures; - a run with secondary and primary bleed started as early as possible. Further two tests investigated the effect of nominal and reduced initial hydro-accumulator pressures on the process, the main question being, whether the starting pressure of the LPIS can be reached without significant overheating of the fuel. These latter were run from lowered initial system pressure in order to be compared to similar tests performed in the project at the PACTEL facility. The two first tests confirmed tendencies shown by earlier plant calculations that neither the secondary nor the primary bleed is effective enough to reduce the pressure, even if their earliest possible actuation is envisaged. As a consequence, low pressure injection could not be started in time to avoid severe fuel rod heat-up and the core power had to be cut in both tests. Comparing the results of tests 3 and 4 the beneficial effect of lowered HA pressure could be analysed. Although heater rod temperatures started to rise also in this test after hydro-accumulators were empty, the secondary and primary bleed actions resulted in the primary pressure dropping to 0.7 MPa and LPIS injection

  8. Market Power in Hydro-Thermal Supply

    International Nuclear Information System (INIS)

    Edin, Karl-Axel

    2006-12-01

    Despite having had a deregulated electricity market in Sweden for over ten years we still need to increase our understanding as to how deregulated electricity markets actually work and how possible problems are to be solved. One question that is always in focus is if the competition between generators in the Nordic electricity market really works the way it was intended. Many argue that the concentration in ownership of generation plants already has gone too far. Together with joint ownership in nuclear facilities and barriers for entrance, critics say that this has resulted in higher electricity prices than necessary. In this report different methods to (ex ante) study potential possibilities for generating firms to influence the electricity price (market power) and (ex post) discover possible manipulation through analysing the spot price and other observed factors on the electricity market are analysed. The purpose of the longer underlying paper is to give a comprehensive treatment of the electricity market with storage, i.e. hydro power, with an auction market organisation and to test the models on the Nordic market in order to explore the explanatory power of auction market theory and the theory of contestable market. The main theoretical effort in the paper concerns auction theory with inventories. The paper develops an inter-temporal auction model of a thermal-hydro power market. Parallel to the derivation of the basic equations a numerical model is developed in order to illustrate the results of the model. Section 2 of the present paper summarizes the basic equations (derived in the longer paper) for an inter-temporal auction thermal-hydro market. Section 3 contains the illustrations of solutions to equations for some stylized markets. In section 4 the auction model is tested on the Nordic market

  9. The development of small-hydro in China; Le developpement de la petite hydraulique en Chine

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, X. [United Nations Environment Programme, Riso (Denmark); Pan, J. [Chinese Academy of Social Sciences (China). Research Centre for Economic Development

    2007-04-15

    Small hydro is a renewable source of energy that is economically and technically viable. This article described China's investment in small-scale hydroelectric power plants in 1,600 remote communities. Seventy per cent of China's small hydro power stations are concentrated in remote impoverished communities. These power stations provide electricity to 300 million people in China, where half of the territories, one third of the districts and towns, and one quarter of the population depend primarily on this energy source for their electricity needs. The first power station was built in the province of Yunnan in 1912, but the real development of small hydro occurred after 1950, and can be divided into three phases. Phase 1 occurred before 1980 when small hydro power stations concentrated on providing electricity for lighting in rural areas as well as for transforming agriculture and irrigation. For many decades following the foundation of the Republic of China, rural areas did not have access to electricity or had serious shortages of electricity. In order to ensure electricity in isolated and remote areas, the Chinese government requested that local authorities build and exploit small hydro where conditions were favourable, and this while respecting water resources. Phase 2 occurred between 1980s and 1990s, with a focus on improving the performance of small hydro power stations to include electricity provisions for local enterprises. During phase 2, small hydro became a tool for dynamic rural development for farmers to increase their revenues. The latest phase in small hydro development has also helped reduce poverty and develop local economies, but in addition, it plays a role in the long term protection of ecosystems, the environment and rural modernization. Today 660,000 people work for small power stations and most are employed locally. Replacing firewood with electricity has saved 130,000 hectares of forested land and helped protect ecosystems. Small

  10. Re-potentiation of hydro-generators: a proposal of analysis and implementation methodology; Repotenciacao de hidrogeradores: uma proposta de metodologia de analise e implantacao

    Energy Technology Data Exchange (ETDEWEB)

    Sa, Fabio Salomao Fernandes

    1996-07-01

    The hydro-generators suffer during its operative useful life a combination of stresses of nature thermal, electric, mechanics and environmental. With the time, they are going losing the capacity to support those stresses and the power plants suffer, more and more frequently, undesirable stops for repair services and maintenance. In function of the high costs incurred with these stopped, the operation of the power plant can be economically impracticable. That unavailability of the generation for the electric system, it results in reduction of the reliability, burdening the politics of load ruling. The re-potentiation is a proposal that seeks to extend the useful life of hydro-generators, at the same time that it try to rescue the reliability and the readiness of the plant, with larger power. The power increase is usually made possible, or for the surplus of the hydro resources in excess, or for the reduction of the losses of all the components of the energy flow. That work proposes a methodology structured starting from the estimate of the potential, of rising of data, of the basic project and of the executive project. Modern techniques of engineering, new processes and new materials, allow the re-potentiation of those hydro-generators returning them new useful life, under conditions economically justifiable.

  11. Ontario Hydro annual report 1986

    Energy Technology Data Exchange (ETDEWEB)

    1987-04-01

    Ontario Hydro`s annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics.

  12. Feasibility analysis of micro hydro plant at nawangan village of pacitan district

    Directory of Open Access Journals (Sweden)

    Diana Dellariam Bayu

    2017-12-01

    Full Text Available Nawangan Village of Pacitan District utilizes Kedung Pasang Micro Hydro Plant (MHP as a power source, but the existing electricity power unable suffice the demand so it needs revitalization by calculating the new unit price and debit because of the previous reference already invalid. The problem is that the investment required for the construction of the MHP must provide benefits for a certain period. This study analyzed the ratio of power and energy potential of MHP with changes in pipe diameter and speed of existing turbines, and calculated the cost. The available power is currently at 112.5 kW and energy is 82150.66 kWh. The results of the analysis show that the power increase can be done up to 142,95 kW a year or equivalent 218%, the energy can be done up to 139.427 kWh a year, meanwhile the benefit is Rp44.566.169, increase Rp26.604.588,- from existing condition or equivalent 148,1% which is done by changing the diameter of penstock and the turbine. Economic analysis of Kedung Pasang MHP development plan shows NPV of Rp6.717.110,- that is greater than 0, the value of IRR is 11% greater than the interest rate set by Bank Negara Indonesia 46 of 10,25% and BCR value of 1,19 is greater than 1, thus the revitalization of Kedung Pasang MHP feasible to be implemented.

  13. Fixing hydro - The forgotten renewable

    International Nuclear Information System (INIS)

    Nalder, N.

    1992-01-01

    Since the dawn of civilization, man has captured the energy potential of falling water, from the water wheels in the fertile crescent of ancient times to today's highly sophisticated conventional and pumped storage projects. As we approach the 21st century, electric energy captured from falling water provides 2.0 trillion kilowatt-hours (21.23 quadrillion Btu), roughly 20% of the world's electric energy. Of the 2.56 billion kilowatts of the world's installed electric generating capacity, hydropower accounts for 24%. Between 1980 and 1989, world generation of hydroelectric power rose from 1.7 trillion kWh to 2.0 trillion kWh. As of January 1, 1988, the US has 90.5 million kW of installed hydro capacity - 70.8 million kW of it under license by the Federal Energy Regulatory Commission - with annual generation estimated at just under 300 billion kWh. Hydro's share, which not long ago comprised 13% of the nation's total capacity, now is just a 9% share. The US has the option to choose one or another path for hydro. If policy makers are willing to coast on a cushion of cheap natural gas, they will continue to shun hydro and put obstacles in its path. But if they come to regard hydro as an attractive resource - as they did only recently - economically and environmentally, they will encourage more balance in resource policies. Believing that interest in a balanced national resource portfolio will grow, the author reviews the past and suggests a possible future course of reasonable development for hydro. The article concludes with some suggested principles that will be needed if the appropriate balance is to be found

  14. Remote micro hydro

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    The micro-hydro project, built on a small tributary of Cowley Creek, near Whitehorse, Yukon, is an important step in the development of alternative energy sources and in conserving expensive diesel fuel. In addition to demonstrating the technical aspects of harnessing water power, the project paved the way for easier regulatory procedures. The power will be generated by a 9 meter head and a 6 inch crossflow turbine. The 36 V DC power will be stored in three 12 V batteries and converted to ac on demand by a 3,800 watt inverter. The system will produce 1.6 kW or 14,016 kWh per year with a firm flow of 1.26 cfs. This is sufficient to supply electricity for household needs and a wood working shop. The project is expected to cost about $18,000 and is more economical than tying into the present grid system, or continuing to use a gasoline generator. An environmental study determined that any impact of the project on the stream would be negligible. It is expected that no other water users will be affected by the project. This pilot project in micro-hydro applications will serve as a good indicator of the viability of this form of alternate energy in the Yukon. The calculations comparing the micro-hydro and grid system indicate that the mico-hydro system is a viable source of inflation-proof power. Higher heads and larger flow resulting in ac generation in excess of 10 kW would yield much better returns than this project. 3 tabs.

  15. Architecture at Hydro-Quebec. L'architecture a Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  16. Small hydro in Ukraine: To invest or not to invest?

    Energy Technology Data Exchange (ETDEWEB)

    Loechen, Liv Arntzen

    2011-07-01

    The vast and unexploited renewable energy potential and the introduction of green tariffs in 2009 have made Ukraine an attractive location for investors within the renewable energy sector. The Green Tariff system offers developers and investors the highest feed-in tariffs in Eastern Europe, and thus far covers alternative energy production from biomass, biogas, wind power plants and hydropower plants. Ukraine has a history in both large- and small hydro production. Whereas the potential of the country's big rivers is now to a great extent exploited, this is not the case for the smaller watercourses. Ukraine is well endowed with small rivers, approximately 60,000 of which can be classified as 'very small'. Most of these are located in the western part of the country, near the Carpathian Mountains. However, despite the natural potential, foreign investors should be aware of the potential risks and hurdles. The country has a huge problem with corruption, and the process of obtaining licenses is not straight forward. On the whole, it can be worthwhile exploring the possibilities of small hydro production in Ukraine for those who can deal with a high level of risk and uncertainty. If not, one would be better advised to look for investment locations elsewhere.(auth)

  17. Naturalization of landscaped parkland at Ontario Hydro's Nanticoke generating station

    International Nuclear Information System (INIS)

    McKenna, G.R.

    1998-01-01

    The implementation of a program for the naturalization of Nanticoke Park, a 30 hectare area located on the property of Ontario Hydro's Nanticoke Generating Station was discussed. The station, which is located in southern Ontario very near to noted wildlife areas, is the largest coal-fired generating station in North America. Naturalization of Nanticoke Park began with passive naturalization of interior areas. An active naturalization program involving four to five hectare size areas annually was begun in 1997, to be completed over a five -year period. This presentation described the site preparation, planting methods, post-planting tending methods, survival assessment of planted areas, and scientific research initiatives including mulch trials with zebra mussel shells to increase soil moisture. The lessons learned from the two year experiment in determining the optimum planting strategy and methods were described. 7 refs., 1 tab

  18. Annual radiological environmental operating report: Sequoyah Nuclear Plant, 1987

    International Nuclear Information System (INIS)

    1988-04-01

    This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of the Sequoyah Nuclear Plant in 1987. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. 2 figs., 2 tabs

  19. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  20. Study on analgesic and anti-inflammatory properties of Cordia myxa fruit hydro-alcoholic extract.

    Science.gov (United States)

    Ranjbar, Mohammadmehdi; Varzi, Hossein Najafzadeh; Sabbagh, Atefeh; Bolooki, Adeleh; Sazmand, Alireza

    2013-12-15

    Cordia myxa is a plant which is used in tropical regions of the world. Analgesic and anti-inflammatory effect of fruit of this medicinal plant was investigated in mice. Hydro-alcoholic extract of it was prepared by maceration method. Formalin test was conducted in six groups of mice (6 animals in each group) and acetic acid test in another six groups (6 mice). Groups one to six in each test were administered normal saline, oral indomethacin, intraperitoneal tramadol, 100 mg kg(-1) oral extract, 200 mg kg(-1) oral extract and 100 mg kg(-1) intraperitoneal extract, respectively. The duration of foot lickings were calculated in formalin- administered (1st) group within min 0 to 5 (acute phase) and 15 to 25 (chronic phase). Acetic acid-induced writhings were counted within 10 min in the 2nd group. The results showed that hydro-alcoholic extract of Cordia myxa fruit was considerably effective in formalin test. Also, analgesic and anti-inflammatory properties of this plant's fruit in both acute and chronic phase are somewhat similar to these properties in the study on animal model of experimental colitis.

  1. Sinkhole investigated at B.C. Hydro`s Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1996-07-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro`s W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig.

  2. Small hydroelectric power plants - shelf goods or tailor-made?

    International Nuclear Information System (INIS)

    Aas, Trond R.

    2002-01-01

    If small hydroelectric power plants are defined to be hydroelectric power plants of up to a few 1000 kW, they should be shelf goods because of cost considerations. Design of small hydroelectric power plants is a many-sided optimization task, on a level with constructing larger hydro power plants. But the budget for a small hydro power plant does not permit any comprehensive evaluations. The most important costs are the one-time costs in the form of investments and the following annual costs in the form of operation and maintenance, and losses. Financing costs are not considered in this article

  3. An overview on small hydro in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Filho, G.T. [Federal Univ. of Itajuba (Brazil). National Reference Centre for Small Hydro

    2008-07-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km{sup 2}. It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  4. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    Directory of Open Access Journals (Sweden)

    Irhan Febijanto

    2013-12-01

    Full Text Available Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from carbon market to increase the economic feasibility. Procedure to register the project to United Nation for Climate Change Convention (UNFCCC as a Clean Development Mechanism project was explained in detail. Approved Consolidation Methodology (ACM 0002 Version 12.3.0 was used to calculate grid emission factor in Jawa-Bali-Madura the grid electricity system. It was calculated that the grid emission factor is 0.833 (t-CO2/MWh, and the carbon emission reduction generated for this project is 21,982 ton/year. From the analysis result, it can be proven that the additional revenue from carbon credit could increase the project IRR from 10.28% to 13.52%.

  5. Low head hydro market assessment : main report : vol. 1

    International Nuclear Information System (INIS)

    2008-03-01

    Hydroelectric power is a predictable renewable energy source that produces no greenhouse gases (GHGs) and has low maintenance costs. In addition to river resources, low head hydro is available in sluice gates, irrigation canals, drinking water pressure release valves, and municipal wastewater outfalls. Canada's potential for low head hydro has been estimated at 5000 MW at 2000 different sites across the country. Sites of up to 50 MW have been identified in Ontario and Manitoba. This study performed a market assessment on low head hydro developments. Available and emerging technologies for developing low head hydro were identified. The economics of low head hydro in Canada were explored, and barriers to low head hydro development were identified. Strategies to promote low head hydro development were also explored, and the impact of different incentive types on the low head hydropower market were estimated using a simple economic model. It was concluded that a reduced, streamlined, and standardized environmental assessment process will significantly benefit low head hydro development in Canada. 5 refs., 14 tabs., 17 figs

  6. Environmental radioactivity levels, Browns Ferry Nuclear Plant. Annual report, 1985 (TVA/NUC SVS/RH)

    International Nuclear Information System (INIS)

    1986-04-01

    The preoperational environmental radiological monitoring program established a baseline of data on the distribution of natural and manmade radioactivity in the environment near the plant site. However, seasonal, yearly, and random variations in the data were observed. In order to determine the potential increases in environmental radioactivity levels caused by the plant, comparisons were made between data for indicator stations (those near the plant) and control stations (those remote from the plant) in conjunction with comparisons with preoperational data

  7. Ekstraksi Minyak Atsiri Dari Akar Wangi Menggunakan Metode Steam - Hydro distillation dan Hydro distilation dengan Pemanas Microwave

    Directory of Open Access Journals (Sweden)

    Maulana M Al Hanief

    2013-09-01

    Full Text Available Penelitian ini bertujuan untuk memperoleh minyak atsiri dari akar wangi dengan modifikasi metode steam-hydro distillation dan hydro distillation yaitu menggunakan pemanasan microwave kemudian membandingkan hasilnya dengan penelitian sebelumnya. Modifikasi ini diharapkan lebih efisien dalam masalah lama penyulingan dan kualitas serta kuantitas rendemen minyak yang lebih baik dan banyak. Penelitian ini menggunakan dua metode yaitu steam-hydro distillation dan hydro distillation dengan pemanfaatan gelombang mikro. Bahan baku yang digunakan dalam penelitian adalah akar wangi jenis pulus wangi yang tumbuh di Kabupaten Garut, Jawa Barat. Variabel yang digunakan adalah bahan baku yang dicacah dan bahan baku utuh dengan variasi massa bahan 50 gr, 60, gr, 70 gr, 80 gr, dan 90 gr dengan pelarut air sebanyak 450 ml dalam labau distiller berukuran 1000 ml. Lama penyulingan adalah lima jam dengan pengamatan tiap 30 menit serta daya yang digunakan adalah 400 Watt. Analisa terhadap hasil minyak atsiri yang diperoleh antara lain analisa GC-MS, spesific gravity, indeks bias, dan bilangan asam. Hasil dari penelitian ini dibandingkan dengan hasil penelitian terdahulu yang tidak memanfaatkan gelombang mikro. Dari hasil penelitian diperoleh % rendemen kumulatif, sifat fisik, sifat kimia, dan kandungan komponen minyak dari metode steam-hydro distillation lebih baik dibandingkan metode hydro distillation ditandai dengan kuantitas dan kualitas yang sesuai dengan SNI.  Sementara itu jika dibandingkan dengan metode terdahulu dapat disimpulkan bahwa penggunaan gelombang mikro lebih efisien dalam waktu dan kuantitas serta kualitas minyak yang lebih baik dibandingkan tanpa penggunaan gelombang mikro

  8. Hydro-Quebec looks south

    International Nuclear Information System (INIS)

    Ross, P.

    1997-01-01

    The recent introduction of Hydro-Quebec, the Canadian utility, into selling cheap electric power in the United States (US) deregulated power market is described, following applications to the US Federal Energy Regulatory Commission. As its prices are so much cheaper than its US competitors, it is expected that the company will soon have many willing customers across the USA. Hydro-Quebec will remain a publicly owned utility, but has experienced restructuring in order to meet this new competitive challenge. (UK)

  9. Hydro-Quebec is profitable

    International Nuclear Information System (INIS)

    Poirier, M.

    1997-01-01

    The pros and cons of the potential privatisation of Hydro-Quebec were discussed. A brief review of charges of less than competent management, low profitability and the corporation's recent administrative restructuring was presented. The general thrust of the argument was that Hydro-Quebec plays a crucial role in the economic development of Quebec, it can be made to be more profitable and that for the good of Quebec it should continue as a public corporation under the control of the provincial government

  10. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Jackson, H.A.; Woodhead, L.W.; Fanjoy, G.R.

    1984-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations for the workers and the public

  11. Small steps for hydro

    International Nuclear Information System (INIS)

    Wicke, Peter

    1998-01-01

    The government in Peru has decided to utilise its gas reserves and restrict hydro to relatively small schemes. A number of reasons for the decision are given. In 1997, the Shell-Mobile-Bechtel-COSAPI consortium was formed and agreements were signed regarding exploiting Gas de Camisea. The country's energy needs to 2010 are being assessed. It is likely that by 2001 the whole of south Peru will be receiving gas from Camisea. The Peru situation is discussed under the headings of (i) existing capacity, (ii) growing demands, (iii) a history of hydro in Peru, (iv) electrification and SHP and (v) outlook. The future for Peru's electric energy development is bright. While most of its new power capacity will come from natural gas, the small hydros also have a part to play. A stronger commitment of national and regional political authorities to consider supplies outside the big cities is said to be needed. (UK)

  12. Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration: Hydro power flexibility for power systems

    Energy Technology Data Exchange (ETDEWEB)

    Huertas-Hernando, Daniel [Department of Energy Systems, SINTEF, Trondheim Norway; Farahmand, Hossein [Department of Electric Power Engineering, Norwegian University of Science and Technology (NTNU), Trondheim Norway; Holttinen, Hannele [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Kiviluoma, Juha [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Rinne, Erkka [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Söder, Lennart [Department of Electrical Engineering, KTH University, Stockholm Sweden; Milligan, Michael [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Ibanez, Eduardo [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Martínez, Sergio Martín [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Gomez-Lazaro, Emilio [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Estanqueiro, Ana [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Rodrigues, Luis [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Carr, Luis [Research Association for Energy Economics (FfE GmbH), Munich Germany; van Roon, Serafin [Research Association for Energy Economics (FfE GmbH), Munich Germany; Orths, Antje Gesa [Energinet.dk, Fredericia Denmark; Eriksen, Peter Børre [Energinet.dk, Fredericia Denmark; Forcione, Alain [Hydro Quebec, Montréal Canada; Menemenlis, Nickie [Hydro Quebec, Montréal Canada

    2016-06-20

    Hydro power is one of the most flexible sources of electricity production. Power systems with considerable amounts of flexible hydro power potentially offer easier integration of variable generation, e.g., wind and solar. However, there exist operational constraints to ensure mid-/long-term security of supply while keeping river flows and reservoirs levels within permitted limits. In order to properly assess the effective available hydro power flexibility and its value for storage, a detailed assessment of hydro power is essential. Due to the inherent uncertainty of the weather-dependent hydrological cycle, regulation constraints on the hydro system, and uncertainty of internal load as well as variable generation (wind and solar), this assessment is complex. Hence, it requires proper modeling of all the underlying interactions between hydro power and the power system, with a large share of other variable renewables. A summary of existing experience of wind integration in hydro-dominated power systems clearly points to strict simulation methodologies. Recommendations include requirements for techno-economic models to correctly assess strategies for hydro power and pumped storage dispatch. These models are based not only on seasonal water inflow variations but also on variable generation, and all these are in time horizons from very short term up to multiple years, depending on the studied system. Another important recommendation is to include a geographically detailed description of hydro power systems, rivers' flows, and reservoirs as well as grid topology and congestion.

  13. Hydrogen production at hydro-power plants

    Science.gov (United States)

    Tarnay, D. S.

    A tentative design for hydrogen-producing installations at hydropower facilities is discussed from technological, economic and applications viewpoints. The plants would use alternating current to electrolyze purified river water. The hydrogen would be stored in gas or liquid form and oxygen would be sold or vented to the atmosphere. The hydrogen could later be burned in a turbine generator for meeting peak loads, either in closed or open cycle systems. The concept would allow large hydroelectric plants to function in both base- and peak-load modes, thus increasing the hydraulic utilization of the plant and the capacity factor to a projected 0.90. Electrolyzer efficiencies ranging from 0.85-0.90 have been demonstrated. Excess hydrogen can be sold for other purposes or, eventually, as domestic and industrial fuel, at prices competitive with current industrial hydrogen.

  14. The effectiveness of new austrian tunnelling method (NATM for hydro power plant construction: lau gunung power plant, north sumatera, indonesia

    Directory of Open Access Journals (Sweden)

    Ade Khoir Rizki

    2017-01-01

    Full Text Available Hydro Electric Power Plant is a power generating system using gravity fall of water as the main force to move the turbine and generate electricity. The construction purpose of Lau Gunung hydropower (2×7. 5 MW that is located in Dairi, North Sumatra, is to Supply power to 14,000 house of the surrounding region. The river run-off system, where the water is immediately contained and then flowed through a tunnel considering the discharge flowing river, where it is constant and does not occur in the fluctuating water level. The Lau Gunung river has the minimum flow that can exceed from 15 to 25 m3/s with a high tunnel dimensions of 4 metres long, 3,9 metres wide and a length of 1,6 kilometres. In terms of the analysis of the time effectiveness of the NATM can be saved because of the continuous work of 24 hours, without any obstacles in which the sub methods used include the drilling & blasting. The tunnel then use the form of steel reinforcement rib and Safety shotcrete lining. The general review may show that using NATM result a tremendous savings, also the use of horse shape conduce small displacement which is effective for the construction.

  15. Hydro or the waltz of managers

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    A critique of current management and personnel problems at Hydro-Quebec was presented. With 20,000 employees and some of the world's greatest hydroelectric projects to its credit, Hydro-Quebec has historically been a source of great pride for its employees and Quebec's society. However, recent problems related to management, bureaucratization and communications within the corporation have led to important moral problems within the workforce. Management of the corporation under the newly appointed president, Andre Caille, the issue of profitability and competitiveness, the worsening morale among employees and the relationship between Hydro-Quebec and the provincial government were the principal topics discussed

  16. The Flakt-Hydro process: flue gas desulfurization by use of seawater

    Energy Technology Data Exchange (ETDEWEB)

    Xia, W.Z. [ABB China Limited, Shanghai (China)

    1999-07-01

    ABB's seawater scrubbing process (the Flakt-Hydro process) for flue gas desulfurization has recently triggered interest among power producers because of its simple operating principle and high reliability. The process uses seawater to absorb and neutralize sulfur dioxide in flue gases. The absorbed gas is oxidized and returned to the ocean in the form it originated in the first place, namely as dissolved sulfate salts. The process uses the seawater downstream of the power plant condensers. This paper gives an introduction to the basic principle of the process and presents some of the recent power plant applications, namely at the Paiton Private Power Project; Phase 1 (2 x 670 MWe) in Indonesia and at the Shenzhen West Power Plant, Unit 2 (300 MWe) in China.

  17. Managing a hydro-energy reservoir: A policy approach

    Energy Technology Data Exchange (ETDEWEB)

    Van Ackere, Ann [HEC Lausanne, Internef, Universite de Lausanne, CH 1015 Lausanne, Dorigny (Switzerland); Ochoa, Patricia [London Business School, Regent' s Park, London NW1 4SA (United Kingdom)

    2010-11-15

    Liberalisation and privatisation have increased the need to gain more understanding into the management of hydro storage (HS) plants. We analyse what types of reservoir management policies enable an owner or a public authority to achieve their respective objectives. By 'policy' we understand simple, easily applicable decision rules, which enable a decision maker to decide when and how much to produce based on currently available information. We use a stylised deterministic simulation model of a hydro-power producer (HP) who behaves strategically. We study a non-liberalised market, where the authorities aim to minimise the total electricity cost for customers and a liberalised market where the HP attempts to maximise his contribution. This enables us to evaluate the impact of the liberalisation of HS production decisions on production volumes and electricity prices. We conclude that imposing rigid policies with the aim of limiting the potential for strategic behaviour can create incentives to produce only at very high prices throughout the year. This can lead to very high total costs, especially when the producer has most flexibility (large reservoirs combined with large turbine capacity). More surprisingly, we observe lower total production in a non-liberalised market. (author)

  18. Managing a hydro-energy reservoir: A policy approach

    Energy Technology Data Exchange (ETDEWEB)

    Ackere, Ann van, E-mail: Ann.vanAckere@unil.c [HEC Lausanne, Internef, Universite de Lausanne, CH 1015 Lausanne, Dorigny (Switzerland); Ochoa, Patricia, E-mail: Patricia.Ochoa@edfenergy.co [London Business School, Regent' s Park, London NW1 4SA (United Kingdom)

    2010-11-15

    Liberalisation and privatisation have increased the need to gain more understanding into the management of hydro storage (HS) plants. We analyse what types of reservoir management policies enable an owner or a public authority to achieve their respective objectives. By 'policy' we understand simple, easily applicable decision rules, which enable a decision maker to decide when and how much to produce based on currently available information. We use a stylised deterministic simulation model of a hydro-power producer (HP) who behaves strategically. We study a non-liberalised market, where the authorities aim to minimise the total electricity cost for customers and a liberalised market where the HP attempts to maximise his contribution. This enables us to evaluate the impact of the liberalisation of HS production decisions on production volumes and electricity prices. We conclude that imposing rigid policies with the aim of limiting the potential for strategic behaviour can create incentives to produce only at very high prices throughout the year. This can lead to very high total costs, especially when the producer has most flexibility (large reservoirs combined with large turbine capacity). More surprisingly, we observe lower total production in a non-liberalised market.

  19. Managing a hydro-energy reservoir: A policy approach

    International Nuclear Information System (INIS)

    Van Ackere, Ann; Ochoa, Patricia

    2010-01-01

    Liberalisation and privatisation have increased the need to gain more understanding into the management of hydro storage (HS) plants. We analyse what types of reservoir management policies enable an owner or a public authority to achieve their respective objectives. By 'policy' we understand simple, easily applicable decision rules, which enable a decision maker to decide when and how much to produce based on currently available information. We use a stylised deterministic simulation model of a hydro-power producer (HP) who behaves strategically. We study a non-liberalised market, where the authorities aim to minimise the total electricity cost for customers and a liberalised market where the HP attempts to maximise his contribution. This enables us to evaluate the impact of the liberalisation of HS production decisions on production volumes and electricity prices. We conclude that imposing rigid policies with the aim of limiting the potential for strategic behaviour can create incentives to produce only at very high prices throughout the year. This can lead to very high total costs, especially when the producer has most flexibility (large reservoirs combined with large turbine capacity). More surprisingly, we observe lower total production in a non-liberalised market. (author)

  20. Hydro-Quebec 2005 annual report : people with energy

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec generates, transmits and distributes electricity mainly produced by renewable energy sources. Its sole shareholder is the Quebec government. This annual report reviewed the operations of Hydro-Quebec, and provided data on energy sales, production and details of the utility's environmental programs. Information on Hydro-Quebec subsidiaries in 2005 was presented in the following separate sections: Hydro-Quebec Production; Hydro-Quebec TransEnergie; Hydro-Quebec Distribution; Hydro-Quebec Equipement; and the Societe d'energie de la Baie James. In 2005, Hydro-Quebec Distribution signed contracts for an initial block of 990 MW of wind power and issued a tender call for an additional 2000 MW of wind power. A generator balancing service was created and authorized by the Regie de l'energie. Hydro-Quebec customers have achieved energy savings of nearly 450 GWh in 2005. The commissioning of Toulnustouc generating station was achieved 5 months ahead of schedule. The 526 MW facility will generate 2.7 TWh annually. Work at the Chute-Allard and Rapide-des-Coeurs sites has continued, as well as construction at Mercier and Peribonka and Eastmain-1. Income from continuing operations came to $2.25 billion, a $124 million increase that was attributed to a rise in domestic sales and net short-term exports. The income was offset by higher pension expenses, depreciation and amortization, as well as by cost of supply on external markets and financial expenses. All other operating expenses were lower than in 2004. Capital spending for the transmission system reached its highest level since 1997, with $793 million invested, including $336 million to meet growth. Data on the company's financial performance, executive changes and reorganization were provided. Financial statements included a review and analysis of financial transactions, an auditor's report, as well as customary notes to the consolidated financial statement including balance sheets, assets, liabilities and

  1. Hydro-Quebec's environmental policy

    International Nuclear Information System (INIS)

    1996-10-01

    Hydro-Quebec established a new environmental policy on August 1, 1996. A summary of the policy was presented. According to this policy statement the utility undertakes to recognize the environmental implications of its activities and assumes responsibilities for these implications by integrating them into its corporate decision-making processes. The following general principles and means of implementation have been highlighted: (1) sustainable development, (2) strict, responsible environmental management, (3) environmental research, (4) enhancement of activities and facilities, (5) information, consultation and dialogue, and (6) environmental responsibility of Hydro-Quebec personnel, subsidiaries and business partners

  2. Climate impact on BC Hydro's water resources

    International Nuclear Information System (INIS)

    Smith, D.; Rodenhuis, D.

    2008-01-01

    BC Hydro like many other hydro utilities has used the historical record of weather and runoff as the standard description the variability and uncertainty of the key weather drivers for its operation and planning studies. It has been conveniently assumed that this historical record is or has been statistically stationary and therefore is assumed to represent the future characteristics of climatic drivers on our system. This assumption is obviously no longer justifiable. To address the characterisation of future weather, BC Hydro has a multi-year a directed research program with the Pacific Climate Impacts Consortium to evaluate the impacts of climate change on the water resources that BC Hydro manages for hydropower generation and other uses. The objective of this program is to derive climate change adjusted meteorologic and hydrologic sequences suitable for use in system operations and planning studies. These climate-adjusted sequences then can be used to test system sensitivity to climate change scenarios relative to the baseline of the historical record. This paper describes BC Hydro's research program and the results achieved so far. (author)

  3. AECB staff annual report of Bruce Heavy Water Plant operation for the year 1991

    International Nuclear Information System (INIS)

    1992-11-01

    Bruce Heavy Water Plant operation was acceptably safe in 1991. There were no breaches of any of the regulations issued under the authority of the Atomic Energy Control Act. There was one violation of the operating licence. For one hour on October 30, 1991, water leaving the plant contained more hydrogen sulphide than Ontario regulations allow. There was no threat to public health or safety or harm to the environment as a result of this violation. One worker was overcome by hydrogen sulphide. The worker did not lose consciousness, but had the symptoms of H 2 S poisoning. Ontario Hydro took actions to increase awareness of the Operating Policy and Principles at Bruce Heavy Water Plant during 1991. All personnel attended a training course, and Ontario Hydro is reviewing all Bruce Heavy Water Plant documentation to ensure it is consistent with the Operating Policies and Principles. Ontario Hydro met 13 of 15 safety-related system availability targets. The AECB is satisfied appropriate action is being taken to improve the performance of the other two systems. Ontario Hydro continued to put heavy emphasis on safety training; however, they did not meet some of their other training targets. Ontario Hydro completed all of the planned emergency exercises at Bruce Heavy Water Plant in 1991. (Author)

  4. An Overview of Power Topologies for Micro-hydro Turbines

    DEFF Research Database (Denmark)

    Nababan, Sabar; Muljadi, E.; Blaabjerg, Frede

    2012-01-01

    This paper is an overview of different power topologies of micro-hydro turbines. The size of micro-hydro turbine is typically under 100kW. Conventional topologies of micro-hydro power are stand-alone operation used in rural electrical network in developing countries. Recently, many of micro-hydro...... power generations are connected to the distribution network through power electronics (PE). This turbines are operated in variable frequency operation to improve efficiency of micro-hydro power generation, improve the power quality, and ride through capability of the generation. In this paper our...... discussion is limited to the distributed generation. Like many other renewable energy sources, the objectives of micro-hydro power generation are to reduce the use of fossil fuel, to improve the reliability of the distribution system (grid), and to reduce the transmission losses. The overview described...

  5. Retrofitting the small-scale hydro power plant 'La Chocolatiere' in Echandens-Bussigny, Switzerland; Rehabilitation de la petite centrale de la Chocolatiere (Echandens - Bussigny)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-05-15

    This report for the Swiss Federal Office of Energy (SFOE) is a project study for the retrofitting of a small-scale hydro power plant installed on the River Venoge, between the communities of Echandens and Bussigny, western Switzerland. At this site, hydro power is used since the 18{sup th} century. A permanent license to use at most 3 m{sup 3}/s is available. The study concludes that the maximum flow rate of 6 m{sup 3}/s would be more advantageous, implying a 35 cm higher dam on the river. Two turbines could then be installed, leading to the maximum electric power of 177 kW and the power production of 727,000 kWh/y. From the detailed inventory of the retrofitting work and the installation of the new turbines - including a new fish ladder according to the legislation in force - the authors conclude that electricity could be generated at a cost amounting to about CHF 0.24/kWh. It is recommended to request the modification of the water use license in order to be able to use up to 6 m{sup 3}/s.

  6. Twenty-five years of research in hydro-ecology at the EDF research and development division

    International Nuclear Information System (INIS)

    Gosse, Ph.

    1999-01-01

    Hydro-ecology (or aquatic ecology) is the study of aquatic systems in their interacting aspects: physical, chemical and biological. The creation in 1974 of the Environment Department at EDF Research and Development Division marked the start in France of quantitative hydro-ecology applied to power generation installations. The studies developed around several main themes, determined both the expansion of the nuclear programme and by changes in French environmental regulations, in particular the 1976 law on impact studies, the 1984 fishing and hydro-biology law and the 1992 water law. In this framework, he effect of artificial warming of rivers, eutrophication of continental and marine waters, transfers of mineral micro-pollutants and radionuclides in rivers, and problems specific to hydropower installations such as guaranteed in stream flow or fish pass design, have been studies. This work, conducted in collaboration with many other laboratories, has led to the development of original quantitative approaches, notably in the field of numerical modelling. The paper selects several of the tools developed whose scope of application is wider than the environment and management of thermal or hydropower plants. Two major applications grouping the experience acquired in hydro-ecology are presented: the AGIRE software and the global environment study of the Singrauli area in India. (author)

  7. Impact of the future water value on wind-reversible hydro offering strategies in electricity markets

    International Nuclear Information System (INIS)

    Sánchez de la Nieta, A.A.; Contreras, J.; Catalão, J.P.S.

    2015-01-01

    Highlights: • A stochastic mixed integer linear model is proposed to maximize the profit and the future water value. • Conditional Value at Risk (CVaR) is used for risk-hedging. • The offer strategies analyzed are single and separate, with and without a physical connection. • The effect of considering the future water value of the reservoirs is studied for several time horizons. - Abstract: A coordinated offering strategy between a wind farm and a reversible hydro plant can reduce wind power imbalances, improving the system efficiency whilst decreasing the total imbalances. A stochastic mixed integer linear model is proposed to maximize the profit and the future water value FWV of the system using Conditional Value at Risk (CVaR) for risk-hedging. The offer strategies analyzed are: (i) single wind-reversible hydro offer with a physical connection between wind and hydro units to store spare wind energy, and (ii) separate wind and reversible hydro offers without a physical connection between them. The effect of considering the FWV of the reservoirs is studied for several time horizons: one week (168 h) and one month (720 h) using an illustrative case study. Conclusions are duly drawn from the case study to show the impact of FWV in the results.

  8. Global analysis of a renewable micro hydro power generation plant

    Science.gov (United States)

    Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul

    2017-12-01

    Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.

  9. [Ontario Hydro International Inc.]. Annual report 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Ontario Hydro International Inc. is the international representative of Ontario Hydro. OHII operates as a global utility that markets Ontario Hydro's services and products. Its mission is to be the leader in energy efficiency and sustainable development in the international marketplace. This report describes the year's activities in the following areas: Energy management and environment, hydroelectric generation, nuclear products and services, fossil generation, grid (transmission) business, utility management, Asia Power Group Inc. The document also includes financial highlights and international and customer contracts

  10. Set-up of a pump as turbine use in micro-pumped hydro energy storage: a case of study in Froyennes Belgium

    Science.gov (United States)

    Morabito, A.; Steimes, J.; Bontems, O.; Zohbi, G. Al; Hendrick, P.

    2017-04-01

    Its maturity makes pumped hydro energy storage (PHES) the most used technology in energy storage. Micro-hydro plants (electricity production such as wind and solar power. This paper presents the design of a micro-PHES developed in Froyennes, Belgium, using a pump as turbine (PaT) coupled with a variable frequency driver (VFD). The methods adopted for the selection of the most suitable pump for pumping and reverse mode are compared and discussed. Controlling and monitoring the PaT performances represent a compulsory design phase in the analysis feasibility of PaT coupled with VFD in micro PHES plant. This study aims at answering technical research aspects of µ-PHES site used with reversible pumps.

  11. The Effect of Subchronic Administration of the Aqueous and Hydro-alcoholic Extracts of Crocus sativus from Estahbanat, Fars Province, on Mice

    Directory of Open Access Journals (Sweden)

    M Emamghoreishi

    2012-02-01

    Full Text Available Background & aim: In Iranian traditional medicine, Crocus sativus L. has been defined as an exultant plant. The present study was undertaken to determine the effect of subchronic administration of aqueous and hydro-alcoholic extracts of Crocus sativus on mice. Methods: The effect of subchronic i.p. administration of different doses of the aqueous extract (50, 100, 200, 400 mg/kg or water and the hydro-alcoholic extract (100, 200, 400, 800 mg/kg or water of Crocus sativus stigma on immobility, climbing, and swimming behaviors were evaluated in the forced swimming test in mice. Fluoxetine (20 mg/kg and imipramine (15 mg/kg were used as reference drugs. Additionally, the effect of both plant preparations on spontaneous activity was examined. The collected data was analyzed using One-way ANOVA. Results: The aqueous extract at doses of 50 and 100 mg/kg produced a significant reduction in immobility along with an increase in climbing behavior which is similar to those which have been observed with imipramine. The hydro-alcoholic extract did not show significant effects on immobility, climbing and swimming behaviors of all studied doses, compared to control group. The aqueous extract of all studied doses and the hydro-alcoholic extract at dose of 1600 mg/kg decreased spontaneous activity. Conclusion: The results of this study suggests that the aqueous, but not hydro-alcoholic, extract of Crocus sativus stigma from Estahbanat in Fars province, in subchronic administration possess an antidepressant-like activity which may be mediated through norepinephrine system.

  12. Himalayan hydro on the horizon

    International Nuclear Information System (INIS)

    Sharp, Timothy

    2000-01-01

    The prospects for development of hydro in the Himalayas has been enhanced by privatisation and the urgent need for clean electricity in the north of India. There are various hurdles to be overcome before the projects are likely to move forward in earnest before 2005, and these are mentioned. The demand for electricity in India is said to be enormous. At present, there is much polluting industry along the Himalayas. As throughout the Indian privatisation dilemma, the critical issues for development of Himalayan hydro come down to credible commercial power markets and finance. With regard to finance and administrative changes, the Indian government is carrying out a number of actions and these are itemised. The US is vigorously promoting the development of Himalayan hydro as a key to much needed regional co-operation and the World Bank is supportive

  13. An artificial intelligence heat rate/NOx optimization system for Ontario Hydro`s Lambton Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Luk, J.; Bachalo, K.; Henrikson, J. [Ontario Hydro, Toronto, ON (Canada); Roland, W.; Booth, R.C.; Parikh, N.; Radl, B. [Pegasus Technologies Ltd., Painesville, OH (United States)

    1998-12-01

    The utilization of artificial Intelligence (AI)-based software programs to optimize power plant operations by simultaneously improving heat rate performance and reducing NOx emissions was discussed. While many AI programs were initially used for demonstration purposes, they are now available for commercial use due to their promising results. In 1996, the Fossil Business Unit of Ontario Hydro initiated a study to evaluate AI technology as a tool for optimizing heat rate and NOx reduction in coal fired stations. Tests were conducted at Units 3 and 4 of the Lambton Generation Station, located just south of Sarnia, Ontario. The tests were conducted to examine three desirable options: (1) achieve at least 0.5 per cent improvement in heat rate concurrently with a NOx reduction of at least 5 per cent, (2) optimize on `heat rate` only with minimum improvement of 2 per cent, and optimize `minimal NOx` only with reduction target of 20 per cent or more, and (3) reach a collaborative agreement with a supplier to further explore and develop AI optimization applications for other advanced and more complex plant processes. Results indicated that NOx reduction and heat rate improvement are not contradictory goals. 15 refs., 1 fig.

  14. Method for assessing wind power integration in a hydro based power system

    International Nuclear Information System (INIS)

    Norheim, I.; Palsson, M.; Tande, J.O.G.; Uhlen, K.

    2006-01-01

    The present paper demonstrates a method for assessment of how much wind power that can be integrated in a system with limited transmission capacity. Based on hydro inflow data and wind measurements (for different locations of planned wind farms in an area) it is possible to assess how much wind power that can be fed into a certain point in the transmission network without violating the transmission capacity limits. The proposed method combines the use of market modelling and detailed network analysis in order to assess the probability of network congestions rather than focusing on extreme cases. By computing the probability distribution of power flow on critical corridors in the grid it is possible to assess the likelihood of network congestions and the amount of energy that must be curtailed to fulfil power system security requirements (n-1). This way the assessment is not only made of worst case scenarios, assuming maximal flow from hydro plants and maximal wind power production. As extreme case scenarios are short term and may be solved by market mechanisms or automatic system protection schemes (disconnection of wind power or hydro power), the proposed method may reveal that it would be economic to install more wind power than if only based on analysis of worst case scenarios. (orig.)

  15. Experimental Hydro-Mechanical Characterization of Full Load Pressure Surge in Francis Turbines

    Science.gov (United States)

    Müller, A.; Favrel, A.; Landry, C.; Yamamoto, K.; Avellan, F.

    2017-04-01

    Full load pressure surge limits the operating range of hydro-electric generating units by causing significant power output swings and by compromising the safety of the plant. It appears during the off-design operation of hydraulic machines, which is increasingly required to regulate the broad integration of volatile renewable energy sources into the existing power network. The underlying causes and governing physical mechanisms of this instability were investigated in the frame of a large European research project and this paper documents the main findings from two experimental campaigns on a reduced scale model of a Francis turbine. The multi-phase flow in the draft tube is characterized by Particle Image Velocimetry, Laser Doppler Velocimetry and high-speed visualizations, along with synchronized measurements of the relevant hydro-mechanical quantities. The final result is a comprehensive overview of how the unsteady draft tube flow and the mechanical torque on the runner shaft behave during one mean period of the pressure oscillation, thus defining the unstable fluid-structure interaction responsible for the power swings. A discussion of the root cause is initiated, based on the state of the art. Finally, the latest results will enable a validation of recent RANS flow simulations used for determining the key parameters of hydro-acoustic stability models.

  16. Ontario Hydro decontamination experience

    Energy Technology Data Exchange (ETDEWEB)

    Lacy, C S; Patterson, R W; Upton, M S [Chemistry and Metallurgy Department, Central Production Services, Ontario Hydro, ON (Canada)

    1991-04-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  17. Ontario Hydro decontamination experience

    International Nuclear Information System (INIS)

    Lacy, C.S.; Patterson, R.W.; Upton, M.S.

    1991-01-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  18. Collision data involving hydro-carbon molecules

    International Nuclear Information System (INIS)

    Tawara, H.; Itikawa, Y.; Nishimura, H.; Tanaka, H.; Nakamura, Y.

    1990-07-01

    Hydro-carbon molecules are abundantly produced when graphites are used as internal wall materials of hydrogen plasmas and strongly influence properties of low temperature plasmas near the edges as well as those of high temperature plasmas at the center. In this report, following simple description of the production mechanisms of hydro-carbon molecules under the interactions between graphite and hydrogen plasma, the present status of collision data for hydro-carbon molecules by electron impact is discussed and the relevant data are summarized in a series of figures and tables. It should also be noted that, in addition to fusion plasmas, these hydrocarbon data compiled here are quite useful in other applications such as plasma chemistry and material processing. (author)

  19. Energy balance of hydro-aggregate with Pelton water turbine

    International Nuclear Information System (INIS)

    Obretenov, V.

    2005-01-01

    One of the major tasks in the field of hydraulic power engineering refers to machines and equipment modernization in the hydropower plants and pumped storage power plants commissioned more than 20 years ago. The increase of hydraulic units operation efficiency will allow in a number of cases to substantially reduce the specific water consumption and to drive the output of electric energy up. In these cases it is crucial to find out the operational efficiency of individual system elements and to precisely focus the modernization endeavours on such elements where the energy losses go beyond all admissible limits. Besides, the determination of the energy losses in the hydro energy turbo system will allow valid defining of hydraulic units operational scope. This work treats the methods of balance study of a hydraulic unit with Peiton water turbine. The experimental results of the balance study of Belmeken pumped storage power plant hydraulic unit No 5 under turbine operational mode are presented

  20. The Manitoba Hydro-Electric Board 50. annual report

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs

  1. The Manitoba Hydro-Electric Board 50. annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs.

  2. Monitoring Systems for Hydropower Plants

    Directory of Open Access Journals (Sweden)

    Damaschin Pepa

    2015-07-01

    Full Text Available One of the most important issue in hydro power industry is to determine the necessary degree of automation in order to improve the operation security. Depending upon the complexity of the system (the power plant equipment the automation specialist will build a philosophy of control following some general principals of security and operation. Helped by the modern digital equipment, today is relative easy to design a complete monitoring and supervising system including all the subparts of a hydro aggregate. A series of sensors and transducers specific for each auxiliary installation of the turbine and generator will be provided, together with a PLC or an industrial PC that will run an application software for implementing the security and control algorithms. The purpose of this paper is to offer a general view of these issues, providing a view of designing an automation & control and security system for hydro power plants of small, medium and big power.

  3. Development of Hydro-Mechanical Deep Drawing

    DEFF Research Database (Denmark)

    Zhang, Shi-Hong; Danckert, Joachim

    1998-01-01

    The hydro-mechanical deep-drawing process is reviewed in this article. The process principles and features are introduced and the developments of the hydro-mechanical deep-drawing process in process performances, in theory and in numerical simulation are described. The applications are summarized....... Some other related hydraulic forming processes are also dealt with as a comparison....

  4. Role of model structure on the response of soil biogeochemistry to hydro-climatic fluctuations

    Science.gov (United States)

    Manzoni, S.; Porporato, A.

    2005-05-01

    Soil carbon and nutrient cycles are strongly affected by hydro-climatic variability, which interacts with the internal ecosystem structure. Here we test the implications of biogeochemical model structure on such dynamics by extending an existing model by the authors and coworkers. When forced by hydro-climatic fluctuations, the different model structures induce specific preferential nutrient paths among the soil pools, which in turn affect nutrient distribution and availability to microbes and plants. In particular, if it is assumed that microbes can directly assimilate organic nitrogen, plants tend to be inferior competitors for nutrients even in well-watered conditions, while if a certain amount of organic nitrogen is assumed to be mineralized without being first incorporated into microbial cells, vegetation can be advantaged over a wide range of soil moisture values. We also investigate the intensification of competition for nutrients (e.g., nitrogen) between plant and soil microbial communities under extreme hydrologic conditions, such as droughts and intense storms. Frequent rainfall events may determine ideal soil moisture conditions for plant uptake, enhancing nitrogen leaching while lowering oxygen concentration and inhibiting microbial activity. During droughts, the soil water potential often drops to the point of hampering the plant nutrient uptake while still remaining high enough for microbial decomposition and nitrogen immobilization. The interplay of microbe and vegetation water stress is investigated in depth as it controls the ability of one community (e.g., plants or soil microbes) to establish competitive advantage on the other. The long-term effects of these dynamics of competition and nutrient allocation are explored under steady-state and stochastic soil moisture conditions to analyze the feedbacks between soil organic matter and vegetation dynamics.

  5. BC Hydro shops for GHG offsets

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    BC Hydro is reported to have offered to purchase one million tonnes of carbon dioxide reductions in Canada's Greenhouse Gas Emissions Reduction Trading program (GERT). The program uses a baseline and credit system, where emitters purchase measurable quantities of site-specific GHG reductions. Since mid-1998, the program registered five bilateral trades and seven offers to sell. BC Hydro's recent offer is the first offer to buy. BC Hydro has made the offer to buy in expectation of the introduction of the start of the Kyoto Protocol reductions, and expects to be in the game for some time to come if it is to meet its obligations under the Kyoto Protocol. Preference will be given to projects located in Canada, but BC Hydro will consider reductions created anywhere in the world. The financial range of a single trade is between $50,000 and $1 million. (GHG offsets are currently trading in North America for between $.50 and $3.00 Cdn per metric tonne of carbon dioxide equivalent.) At present, offsets are selling at a heavily discounted price because of the uncertainty that investments made now will be credited against future regulations curbing emitters. Consequently, buying now while prices are low, may lead to sizable benefits later, depending on the actual regulations when they are promulgated. Trading now will also give BC Hydro greater credibility and assurance to have its voice heard when discussions about emissions trading and the implementation of emission trading rules reaches the serious stage

  6. Times are changing, Hydro-Quebec multiplies its assets

    International Nuclear Information System (INIS)

    Lefevre, M.

    1997-01-01

    Hydro-Quebec''s advance into the North American and world multi-energy market began with the purchase of an interest in the natural gas holding company Noverco, a commercial partnership with Gaz de France, and marketing agreements with Enron and Trigen in the United States. Hydro-Quebec, the world''s sixth largest electric utility, aims to become a multi-energy enterprise selling not only electricity, but also natural gas, oil and certain renewable forms of energy. Currently, Hydro-Quebec is licensed to make border sales of electricity at regulated prices. Through the US Federal Energy Regulatory Commission (FERC), Hydro-Quebec will be able also to sell electricity through wholesale spot contracts with electricity marketers such as Trigen and Enron

  7. A 100% renewable electricity generation system for New Zealand utilising hydro, wind, geothermal and biomass resources

    International Nuclear Information System (INIS)

    Mason, I.G.; Page, S.C.; Williamson, A.G.

    2010-01-01

    The New Zealand electricity generation system is dominated by hydro generation at approximately 60% of installed capacity between 2005 and 2007, augmented with approximately 32% fossil-fuelled generation, plus minor contributions from geothermal, wind and biomass resources. In order to explore the potential for a 100% renewable electricity generation system with substantially increased levels of wind penetration, fossil-fuelled electricity production was removed from an historic 3-year data set, and replaced by modelled electricity production from wind, geothermal and additional peaking options. Generation mixes comprising 53-60% hydro, 22-25% wind, 12-14% geothermal, 1% biomass and 0-12% additional peaking generation were found to be feasible on an energy and power basis, whilst maintaining net hydro storage. Wind capacity credits ranged from 47% to 105% depending upon the incorporation of demand management, and the manner of operation of the hydro system. Wind spillage was minimised, however, a degree of residual spillage was considered to be an inevitable part of incorporating non-dispatchable generation into a stand-alone grid system. Load shifting was shown to have considerable advantages over installation of new peaking plant. Application of the approach applied in this research to countries with different energy resource mixes is discussed, and options for further research are outlined.

  8. Development and applications of reactor noise analysis at Ontario Hydro's CANDU reactors

    International Nuclear Information System (INIS)

    Gloeckler, O.; Tulett, M.V.

    1995-01-01

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro's CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  9. A hydro-optical model for deriving water quality variables from satellite images (HydroSat): A case study of the Nile River demonstrating the future Sentinel-2 capabilities

    NARCIS (Netherlands)

    Salama, M.; Radwan, M.; van der Velde, R.

    2012-01-01

    This paper describes a hydro-optical model for deriving water quality variables from satellite images, hereafter HydroSat. HydroSat corrects images for atmospheric interferences and simultaneously retrieves water quality variables. An application of HydroSat to Landsat Enhanced Thematic Mapper (ETM)

  10. Ontario hydro radioactive material transportation field guide

    International Nuclear Information System (INIS)

    Howe, W.

    1987-01-01

    The recent introduction of both the AECB Transport Packaging of Radioactive Material Regulations and Transport Canada's Transportation of Dangerous Goods Regulations have significantly altered the requirements for transporting radioactive material in Canada. Extensive additional training as well as certification of several hundred Ontario Hydro employees has been necessary to ensure compliance with the additional and revised regulatory requirements. To assist in the training of personnel, an 'active' corporate Ontario Hydro Field Guide for Radioactive Material Transport document has been developed and published. The contents of this Field Guide identify current Ontario Hydro equipment and procedures as well as the updated relevant regulatory requirements within Canada. In addition, to satisfying Ontario Hydro requirements for this type of information over two thousand of these Field Guides have been provided to key emergency response personnel throughout the province of Ontario to assist in their transportation accident response training

  11. Mechatronics in compressor valves - experience with HydroCOM; Mechatronik in Kompressorventilen - Betriebserfahrungen mit HydroCOM

    Energy Technology Data Exchange (ETDEWEB)

    Rumpold, A. [Hoerbiger Ventilwerke GmbH, Wien (Austria)

    2000-03-01

    Optimisation of fluid flow rates is indispensable in piston compressor operation. Messrs. Hoerbiger are producers of continuous control elements which combine mechanical and electronic components. Applications and examples of the HydroCOM control system are presented. High availability permits servicing intervals around 160,000 hours of operation. The longer operating time will improve the competitive standing of piston compressors as compared to turbocompressors and screw compressors. [German] Fuer den Betrieb von Kolbenkompressoren ist eine optimale Liefermengenregelung unverzichtbarer Bestandteil. Im Gegensatz zu herkoemmlichen Verfahren hat Hoerbiger vor zwei Jahren durch die Kombination von Mechanik und Elektronik eine neue Generation von stufenlosen Mengenregelungen auf den Markt gebracht. Anwendungsbeispiele und Betriebserfahrungen mit der HydroCOM Regelung werden vorgestellt. Hohe Verfuegbarkeit erlaubt Wartungsintervalle fuer HydroCOM Aktuatoren von ca. 16000 Betriebsstunden. Und aufgrund der generell verbesserten Standzeiten von Packungen, Kolbenringen und Ventilen erzielt der so geregelte Kolbenkompressor hohe Attraktivitaet gegenueber Turbo- und Schraubenverdichtern. (orig./AKF)

  12. Usability of a theory of visual attention (TVA) for parameter-based measurement of attention I

    DEFF Research Database (Denmark)

    Finke, Kathrin; Bublak, Peter; Krummenacher, Joseph

    2005-01-01

    four separable attentional components: processing speed, working memory storage capacity, spatial distribution of attention, and top-down control. A number of studies (Duncan et al., 1999; Habekost & Bundesen, 2003; Peers et al., 2005) have already demonstrated the clinical relevance......The present study investigated the usability of whole and partial report of briefly displayed letter arrays as a diagnostic tool for the assessment of attentional functions. The tool is based on Bundesen’s (1990, 1998, 2002; Bundesen et al., 2005) theory of visual attention (TVA), which assumes...... of these parameters. The present study was designed to examine whether (a) a shortened procedure bears sufficient accuracy and reliability, (b) whether the procedures reveal attentional constructs with clinical relevance, and (c) whether the mathematically independent parameters are also empirically independent...

  13. HydroSHEDS: A global comprehensive hydrographic dataset

    Science.gov (United States)

    Wickel, B. A.; Lehner, B.; Sindorf, N.

    2007-12-01

    The Hydrological data and maps based on SHuttle Elevation Derivatives at multiple Scales (HydroSHEDS) is an innovative product that, for the first time, provides hydrographic information in a consistent and comprehensive format for regional and global-scale applications. HydroSHEDS offers a suite of geo-referenced data sets, including stream networks, watershed boundaries, drainage directions, and ancillary data layers such as flow accumulations, distances, and river topology information. The goal of developing HydroSHEDS was to generate key data layers to support regional and global watershed analyses, hydrological modeling, and freshwater conservation planning at a quality, resolution and extent that had previously been unachievable. Available resolutions range from 3 arc-second (approx. 90 meters at the equator) to 5 minute (approx. 10 km at the equator) with seamless near-global extent. HydroSHEDS is derived from elevation data of the Shuttle Radar Topography Mission (SRTM) at 3 arc-second resolution. The original SRTM data have been hydrologically conditioned using a sequence of automated procedures. Existing methods of data improvement and newly developed algorithms have been applied, including void filling, filtering, stream burning, and upscaling techniques. Manual corrections were made where necessary. Preliminary quality assessments indicate that the accuracy of HydroSHEDS significantly exceeds that of existing global watershed and river maps. HydroSHEDS was developed by the Conservation Science Program of the World Wildlife Fund (WWF) in partnership with the U.S. Geological Survey (USGS), the International Centre for Tropical Agriculture (CIAT), The Nature Conservancy (TNC), and the Center for Environmental Systems Research (CESR) of the University of Kassel, Germany.

  14. Experience of pico/micro hydro based power generation

    Energy Technology Data Exchange (ETDEWEB)

    Murthy, S.S. [Indian Inst. of Technology, Delhi, New Delhi (India). Dept. of Electrical Engineering

    2010-07-01

    Although India has approximately 150,000 megawatts of hydro potential, only a small portion is tapped. There is also significant untapped hydro potential in many developing countries such as Nepal, Bhutan, Vietnam, Indonesia and regions in South America and Africa. Small-scale hydroelectric power systems with capacities of up to a few megawatts are eco-friendly and sustainable. They can be classified based on unit sizes as pico (u pto 10 kilowatts), micro (10-100 kilowatts) and mini (100 kilowatts to a few megawatts) hydro systems. Mini hydro systems are always grid connected while micro can be either grid connected or off grid. Pico is always off grid. In India, there are thousands of favorable sites in this range that should be tapped for distributed power generation to electrify local communities. This need is reflected by the global emphasis on distributed power generation as well as the Government of India's policy to promote this type of power generation. A working stand alone pico-hydro power generating system has been successfully installed in 5 sites in Karnataka. The purpose of the project was to demonstrate the technical, managerial and economic feasibility of setting up small hydro projects in remote hilly areas of Karnataka, India and its positive environmental impact. The presentation discussed the site selection criteria; installed sites of pico hydro; system description; parts of the system; the electric load controller; types of electronic load controllers; and a description of the unit and control scheme. tabs., figs.

  15. Small-scale hydro-power plant in Anzonico - Preliminary project; Progetto microcentrale idroelettrica, Anzonico. Programma Centrali idrauliche. Progetto di massima

    Energy Technology Data Exchange (ETDEWEB)

    Dotti, R. [Reali e Guscetti SA, Ambri (Switzerland); Rosselli, P. [Celio Engineering SA, Ambri (Switzerland)

    2009-01-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant in the municipality of Anzonico, southern Switzerland. The water of a small alpine stream is to be used for power generation and vineyard irrigation as well as for the creation of an additional water resource for fire fighting in this sensitive region. The report is foreseen to support the request for a water usage concession to the authorities of the Canton of Ticino. It presents details on the hydrological data for the river and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as is the removal of river sediment. The electricity production expected is discussed, as is the economic viability of the project. Synergies exist with the local electricity utility that will renew and improve its power distribution and telecommunication system when the penstock will be mounted in the underground.

  16. Volume reduction/solidification of liquid radioactive waste using bitumen at Ontario Hydro's Bruce Nuclear Generating Station 'A'

    International Nuclear Information System (INIS)

    Day, J.E.; Baker, R.L.

    1995-01-01

    Ontario Hydro at the Bruce Nuclear Generating Station 'A' has undertaken a program to render the station's liquid radioactive waste suitable for discharge to Lake Huron by removing sufficient radiological and chemical contaminants to satisfy regulatory requirements for emissions. The system will remove radionuclide and chemical contaminants from five different plant waste streams. The contaminants will be immobilized and stored at on-site radioactive waste storage facilities and the purified streams will be discharged. The discharge targets established by Ontario Hydro are set well below the limits established by the Ontario Ministry of Environment (MOE) and are based on the Best Available Technology Economically Achievable Approach (B.A.T.E.A.). ADTECHS Corporation has been selected by Ontario Hydro to provide volume reduction/solidification technology for one of the five waste streams. The system will dry and immobilize the contaminants from a liquid waste stream in emulsified asphalt using thin film evaporation technology

  17. IPPSO raises Hydro exports in smog negotiations

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Independent Power Producers of Ontario (IPPSO) requested federal and provincial committees negotiating atmospheric emission standards to review Ontario Hydro's export wheeling plans. IPPSO alleges that Ontario Hydro is preparing to apply pressure on the Canadian export approval process, and is building up a major effort that will increase emissions, contrary to the objectives embodied in a number of environment protection projects such as the Ontario Smog Plan, The Federal-Provincial NOx Management Plan, the Strategic Options Plan, or the Convention on Long-Range Transboundary Air Pollution Draft NOx Protocol Negotiations. IPPSO alleges further that while Ontario Hydro is one of Canada's largest single emitter of greenhouse gases NOx, and SO 2 , and as a public sector corporation it should be the most amenable to serving the public good, the Corporation is doing exactly the opposite: it actively prevents production of electricity from less polluting sources. It is IPPSO's contention that Ontario Hydro's desire to control the Ontario market could come at significant cost to the environment

  18. Hydrological Modeling in Alaska with WRF-Hydro

    Science.gov (United States)

    Elmer, N. J.; Zavodsky, B.; Molthan, A.

    2017-12-01

    The operational National Water Model (NWM), implemented in August 2016, is an instantiation of the Weather Research and Forecasting hydrological extension package (WRF-Hydro). Currently, the NWM only covers the contiguous United States, but will be expanded to include an Alaska domain in the future. It is well known that Alaska presents several hydrological modeling challenges, including unique arctic/sub-arctic hydrological processes not observed elsewhere in the United States and a severe lack of in-situ observations for model initialization. This project sets up an experimental version of WRF-Hydro in Alaska mimicking the NWM to gauge the ability of WRF-Hydro to represent hydrological processes in Alaska and identify model calibration challenges. Recent and upcoming launches of hydrology-focused NASA satellite missions such as the Soil Moisture Active Passive (SMAP) and Surface Water Ocean Topography (SWOT) expand the spatial and temporal coverage of observations in Alaska, so this study also lays the groundwork for assimilating these NASA datasets into WRF-Hydro in the future.

  19. TVA-based assessment of visual attentional functions in developmental dyslexia

    Directory of Open Access Journals (Sweden)

    Johanna eBogon

    2014-10-01

    Full Text Available There is an ongoing debate whether an impairment of visual attentional functions constitutes an additional or even an isolated deficit of developmental dyslexia (DD. Especially performance in tasks that require the processing of multiple visual elements in parallel has been reported to be impaired in DD. We review studies that used parameter-based assessment for identifying and quantifying impaired aspect(s of visual attention that underlie this multi-element-processing deficit in DD. These studies used the mathematical framework provided by the ‘theory of visual attention’ (TVA; Bundesen, 1990 to derive quantitative measures of general attentional resources and attentional weighting aspects on the basis of behavioral performance in whole- and partial-report tasks. Based on parameter estimates in children and adults with DD, the reviewed studies support a slowed perceptual processing speed as an underlying primary deficit in DD. Moreover, a reduction in visual short term memory storage capacity seems to present a modulating component, contributing to difficulties in written language processing. Furthermore, comparing the spatial distributions of attentional weights in children and adults suggest that having limited reading and writing skills might impair the development of a slight leftward bias, that is typical for unimpaired adult readers.

  20. Annual report 1993 (Ontario Hydro, Toronto)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Ontario Hydro`s prime objective is to supply the people of Ontario with electricity at cost while maintaining high standards of safety and service. The annual report presents energy efficiency and competitiveness, operations in review, the environmental performance of the Corporation, the future, and choices for a sustainable future. A financial review and analysis is also provided, along with an auditor`s report and financial statements.

  1. Alexela ostab Hydro Texaco tanklaketi / Gert D. Hankewitz

    Index Scriptorium Estoniae

    Hankewitz, Gert D.

    2006-01-01

    Kütusefirma Alexela Oil teatas, et ostab tanklaketi Hydro Texaco kõik Balti riikide tanklad. Diagramm: Alexela ja Hydro Texaco majandusnäitajad. Vt. samas: Statoili juht: ühinemine turul muutusi ei too

  2. The HydroServer Platform for Sharing Hydrologic Data

    Science.gov (United States)

    Tarboton, D. G.; Horsburgh, J. S.; Schreuders, K.; Maidment, D. R.; Zaslavsky, I.; Valentine, D. W.

    2010-12-01

    The CUAHSI Hydrologic Information System (HIS) is an internet based system that supports sharing of hydrologic data. HIS consists of databases connected using the Internet through Web services, as well as software for data discovery, access, and publication. The HIS system architecture is comprised of servers for publishing and sharing data, a centralized catalog to support cross server data discovery and a desktop client to access and analyze data. This paper focuses on HydroServer, the component developed for sharing and publishing space-time hydrologic datasets. A HydroServer is a computer server that contains a collection of databases, web services, tools, and software applications that allow data producers to store, publish, and manage the data from an experimental watershed or project site. HydroServer is designed to permit publication of data as part of a distributed national/international system, while still locally managing access to the data. We describe the HydroServer architecture and software stack, including tools for managing and publishing time series data for fixed point monitoring sites as well as spatially distributed, GIS datasets that describe a particular study area, watershed, or region. HydroServer adopts a standards based approach to data publication, relying on accepted and emerging standards for data storage and transfer. CUAHSI developed HydroServer code is free with community code development managed through the codeplex open source code repository and development system. There is some reliance on widely used commercial software for general purpose and standard data publication capability. The sharing of data in a common format is one way to stimulate interdisciplinary research and collaboration. It is anticipated that the growing, distributed network of HydroServers will facilitate cross-site comparisons and large scale studies that synthesize information from diverse settings, making the network as a whole greater than the sum of its

  3. Exploring the impact of reduced hydro capacity and lignite resources on the Macedonian power sector development

    Directory of Open Access Journals (Sweden)

    Taseska-Gjorgievskaa Verica

    2014-01-01

    Full Text Available The reference development pathway of the Macedonian energy sector highlights the important role that lignite and hydro power play in the power sector, each accounting for 40% of total capacity in 2021. In 2030, this dominance continues, although hydro has a higher share due to the retirement of some of the existing lignite plants. Three sensitivity runs of the MARKAL-Macedonia energy system model have been undertaken to explore the importance of these technologies to the system, considering that their resource may be reduced with time: (1 Reducing the availability of lignite from domestic mines by 50% in 2030 (with limited capacity of imports, (2 Removing three large hydro options, which account for 310 MW in the business-as-usual case, and (3 Both of the above restrictions. The reduction in lignite availability is estimated to lead to additional overall system costs of 0.7%, compared to hydro restrictions at only 0.1%. With both restrictions applied, the additional costs rise to over 1%, amounting to 348 M€ over the 25 year planning horizon. In particular, costs are driven up by an increasing reliance on electricity imports. In all cases, the total electricity generation decreases, but import increases, which leads to a drop in capacity requirements. In both, the lignite and the hydro restricted cases, it is primarily gas-fired generation and imports that “fill the gap”. This highlights the importance of an increasingly diversified and efficient supply, which should be promoted through initiatives on renewables, energy efficiency, and lower carbon emissions.

  4. Wound bed preparation: A novel approach using HydroTherapy.

    Science.gov (United States)

    Atkin, Leanne; Ousey, Karen

    2016-12-01

    Wounds that fail to heal quickly are often encountered by community nursing staff. An important step in assisting these chronic or stalled wounds progress through healing is debridement to remove devitalised tissue, including slough and eschar, that can prevent the wound from healing. A unique wound treatment called HydroTherapy aims to provide an optimal healing environment. The first step of HydroTherapy involves HydroClean plus™, this dressing enables removal of devitalised tissue through autolytic debridement and absorption of wound fluid. Irrigation and cleansing provided by Ringer's solution from the dressing further removes any necrotic tissue or eschar. Once effective wound bed preparation has been achieved a second dressing, HydroTac™, provides an ongoing hydrated wound environment that enables re-epithelialisation to occur in an unrestricted fashion. This paper presents 3 case studies of slow healing wounds treated with HydroClean plus™ which demonstrates effective wound debridement.

  5. Hydro makes the most of driftwood

    Energy Technology Data Exchange (ETDEWEB)

    Shinjo, Takahisa [Electric Power Development Company, Tokyo (Japan)

    2001-05-01

    The Electric Power Development Company (EPDC), which owns and operates 58 hydro power plants and controls 40 reservoirs, is reaping benefits from the driftwood collected from the reservoirs. Large amounts of driftwood, litter and illegally dumped wastes are removed from the company's reservoirs every year. The driftwood was previously incinerated but a new processing system is now used which is more cost-effective and has less impact on the environment. EPDC has installed carbonisation kilns and chipping systems at a number of its sites. The end-products (charcoal, wood vinegar and chips) are sold to offset the costs of driftwood processing. The properties of driftwood charcoal make it suitable for a number of applications (eg absorption, deodorisation, soil improvement and humidity control), while pulverised charcoal is sold as a fuel, as a deodorant for drinking water and for humidity control sheets. The wood vinegar has been used as a preservative, in insecticides and to promote plant growth. Refining the wood vinegar has allowed EPDC to develop cosmetics and face creams. Chips are sold to a plywood manufacturer or used as an organic fertiliser.

  6. An Extended VIKOR-Based Approach for Pumped Hydro Energy Storage Plant Site Selection with Heterogeneous Information

    Directory of Open Access Journals (Sweden)

    Yunna Wu

    2017-08-01

    Full Text Available The selection of a desirable site for constructing a pumped hydro energy storage plant (PHESP plays a vital important role in the whole life cycle. However, little research has been done on the site selection of PHESP, which affects the rapid development of PHESP. Therefore, this paper aims to select the most ideal PHESP site from numerous candidate alternatives using the multi-criteria decision-making (MCDM technique. Firstly, a comprehensive evaluation criteria system is established for the first time. Then, considering quantitative and qualitative criteria coexist in this system, multiple types of representations, including crisp numerical values (CNVs, triangular intuitionistic fuzzy numbers (TIFNs, and 2-dimension uncertain linguistic variables (2DULVs, are employed to deal with heterogeneous criteria information. To determine the weight of criteria and fully take the preference of the decision makers (DMs into account, the analytic hierarchy process (AHP method is applied for criteria weighting. After that, an extended Vlsekriterijumska Optimizacija I Kompromisno Resenje (VIKOR method is utilized to provide compromise solutions for the PHESP site considering such heterogeneous information. At last, the proposed model is then applied in a case study of Zhejiang province, China to illustrate its practicality and efficiency. The result shows the Changlongshan should be selected as the optimal PHESP.

  7. Usability of a theory of visual attention (TVA) for parameter-based measurement of attention II

    DEFF Research Database (Denmark)

    Bublak, Peter; Finke, Kathrin; Krummenacher, Joseph

    2005-01-01

    , and spatial distribution of attention. The procedure used was short enough to be applicable within a standard clinical setting. Two brain-damaged patients, selected based on lesion location and neuropsychological test profile, were compared to a control group of 22 healthy subjects. One patient with a right......Based on a 'Theory of Visual Attention' (TVA), whole and partial report of brief letter arrays is presented as a diagnostic tool to estimate four clinically significant attentional components: perceptual processing speed, visual working memory storage capacity, efficiency of top-down control...... inferior parietal lesion showed a pattern of non-spatially and spatially lateralized attention deficits that is typically found in neglect patients. Results from the second patient supported the decisive role of superior frontal brain structures for top-down control of visual attention. This double...

  8. Annual radiological environmental operating report: Browns Ferry Nuclear Plant, 1992

    International Nuclear Information System (INIS)

    1993-04-01

    This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of Browns Ferry Nuclear Plant (BFN) in 1992. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. Small amounts of Co-60 and Cs-134 were found in sediment samples downstream from the plant. This activity in stream sediment would result in no measurable increase over background in the dose to the general public

  9. Overview of Hydrometeorologic Forecasting Procedures at BC Hydro

    Science.gov (United States)

    McCollor, D.

    2004-12-01

    Energy utility companies must balance production from limited sources with increasing demand from industrial, business, and residential consumers. The utility planning process requires a balanced, efficient, and effective distribution of energy from source to consumer. Therefore utility planners must consider the impact of weather on energy production and consumption. Hydro-electric companies should be particularly tuned to weather because their source of energy is water, and water supply depends on precipitation. BC Hydro operates as the largest hydro-electric company in western Canada, managing over 30 reservoirs within the province of British Columbia, and generating electricity for 1.6 million people. BC Hydro relies on weather forecasts of watershed precipitation and temperature to drive hydrologic reservoir inflow models and of urban temperatures to meet energy demand requirements. Operations and planning specialists in the company rely on current, value-added weather forecasts for extreme high-inflow events, daily reservoir operations planning, and long-term water resource management. Weather plays a dominant role for BC Hydro financial planners in terms of sensitive economic responses. For example, a two percent change in hydropower generation, due in large part to annual precipitation patterns, results in an annual net change of \\50 million in earnings. A five percent change in temperature produces a \\5 million change in yearly earnings. On a daily basis, significant precipitation events or temperature extremes involve potential profit/loss decisions in the tens of thousands of dollars worth of power generation. These factors are in addition to environmental and societal costs that must be considered equally as part of a triple bottom line reporting structure. BC Hydro water resource managers require improved meteorological information from recent advancements in numerical weather prediction. At BC Hydro, methods of providing meteorological forecast data

  10. Volume reduction/solidification of liquid radioactive waste using bitumen at Ontario hydro's Bruce nuclear generating station open-quotes Aclose quotes

    International Nuclear Information System (INIS)

    Day, J.E.; Baker, R.L.

    1994-01-01

    Ontario Hydro at the Bruce Nuclear Generating Station open-quotes Aclose quotes has undertaken a program to render the station's liquid radioactive waste suitable for discharge to Lake Huron by removing sufficient radiological and chemical contaminants from five different plant waste streams. The contaminants will be immobilized and stored at on-site radioactive waste storage facilities and the purified streams will be discharged. The discharge targets established by Ontario Hydro are set well below the limits established by the Ontario Ministry of Environment (MOE) and are based on the Best Available Technology Economically Achievable Approach (B.A.T.E.A.). ADTECHS Corporation has been selected by Ontario Hydro to provide volume reduction/solidification technology for one of the five waste streams. The system will dry and immobilize the contaminants from a liquid waste stream in emulsified asphalt using thin film evaporation technology

  11. Advances in the implementation of a generic long term model for the hydro industry

    International Nuclear Information System (INIS)

    Welt, F.

    2004-01-01

    This presentation describes the Vista Long Term (LT) simulation and decision tool developed for the hydropower and water resource industries by Synexus Global. Vista maximizes the value of hydro resources while addressing environmental concerns. It improves water resource management for all uses over the long term. The tool has been used and adapted to many systems around the world, including Bonneville Power Administration, Reliant Energy, PacifiCorp and Great Lakes Power in the United States and Nova Scotia Power, Yukon Energy, and Newfoundland Hydro in Canada. Vista also helps to plan alternative operating policies and system upgrades by maximizing the expected value of generation and transactions. The tool provides reservoir releases, generation, flows, levels and transactions. Hydroelectric generating facilities that use the Vista tool have improved clean energy production as well as increased revenues resulting from reservoir and plant optimization. tabs., figs

  12. BC Hydro triple bottom line report 2002

    International Nuclear Information System (INIS)

    Anon

    2002-08-01

    British Columbia Hydro (BC Hydro) published this document which measures the environmental, social and economic performance of the company. It is a complement to BC Hydro's 2002 Annual Report. The report was prepared to better understand the company's business in terms of its commitment to being an environmentally, socially, and economically responsible company (the three bottom lines). BC Hydro proved its ability to integrate the three bottom lines in decision making processes by carefully examining the environmental, social and economical impacts of programs such as Power Smart, Green and Alternative Energy, and Water Use Planning. All indicators point to BC Hydro achieving its commitment of providing a minimum of 10 per cent of new demand through 2010 with new green energy sources. Water Use Plans were developed for hydroelectric generating stations, and they should all be in place by 2003. Efficiencies realised through the Power Smart program offset the increases in greenhouse gas associated with increased energy demand. Juvenile sturgeon raised in a hatchery were released into the Columbia River in May 2002. The completion of a 40-kilometre trail on the Sunshine Coast was helped by a financial contribution from BC Hydro in the amount of 23,000 dollars. Safety improvements were implemented at eight facilities, such as dam remediation, dam surveillance and instrumentation updates. Scholarships were awarded across the province, along with additional donations to non-profit organizations. Co-op positions were provided for 150 students. Internal energy efficiency programs were successful. Planning is under way for significant maintenance work and equipment replacement projects as the transmission and distribution infrastructure ages. The number of reported indicators was expanded this year. In turn, they were aligned with the revised Global Reporting Initiative (GRI) guidelines. tabs

  13. Impact of flocculation on flotation tailing's hydro-cycloning properties

    Directory of Open Access Journals (Sweden)

    Knežević Dinko N.

    2014-01-01

    Full Text Available Research results of hydro-cycloning of flocculated and non-flocculated flotation tailing from the lead and zinc open pit mine 'Suplja stijena', Sula - Montenegro have been shown in this paper. Reason for this research was finding conditions in order to separate fraction that is suitable for embankment erection. Flotation tailings has been tested in the very state that it goes out from the flotation process and tailings which is flocculated by anionic flocculant. The object was to determine the impact of flocculation on properties of hydro-cycloning products and disposal process. In hydro-cycloning process greater underflow mass is being separated with non-flocculated tailing. Values of geomechanical parameters are significantly different, especially hydro-cyclone's underflow. All geomechanical parameters of hydro-cyclone's underflow are suitable for erecting embankment which shall be made from non-flocculated tailing. Underflow drainage of non-flocculated tailing is faster while overflow drainage is slower and problematic with both tailings.

  14. Dynamic Model for Hydro-Turbine Generator Units Based on a Database Method for Guide Bearings

    Directory of Open Access Journals (Sweden)

    Yong Xu

    2013-01-01

    Full Text Available A suitable dynamic model of rotor system is of great significance not only for supplying knowledge of the fault mechanism, but also for assisting in machine health monitoring research. Many techniques have been developed for properly modeling the radial vibration of large hydro-turbine generator units. However, an applicable dynamic model has not yet been reported in literature due to the complexity of the boundary conditions and exciting forces. In this paper, a finite element (FE rotor dynamic model of radial vibration taking account of operating conditions is proposed. A brief and practical database method is employed to model the guide bearing. Taking advantage of the method, rotating speed and bearing clearance can be considered in the model. A novel algorithm, which can take account of both transient and steady-state analysis, is proposed to solve the model. Dynamic response for rotor model of 125 MW hydro-turbine generator units in Gezhouba Power Station is simulated. Field data from Optimal Maintenance Information System for Hydro power plants (HOMIS are analyzed compared with the simulation. Results illustrate the application value of the model in providing knowledge of the fault mechanism and in failure diagnosis.

  15. Architecture at Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  16. Real-time optical fibre sensor for hydro-alcoholic solutions

    International Nuclear Information System (INIS)

    Fujiwara, E; Takeishi, R T; Hase, A; Ono, E; Santos, J S; Suzuki, C K

    2010-01-01

    The fast determination of ethanol–water concentration in alcohol distillation plants is a primordial requirement to preserve the quality and reduce production losses. The present research proposes an optical fibre sensor for the measurement of hydro-alcoholic concentration in liquids based on the Fresnel reflection principle. The reflection intensities of ethanol samples with 0–100% of water content were measured at different temperatures for 1310 nm and 1550 nm wavelengths. Calibration curves were prepared by fitting the experimental data and implemented in a computer algorithm. According to the functional tests, the sensor is capable of identifying samples with less than 1% error on concentration and providing practically real-time analysis

  17. Modelling energy production by small hydro power plants in collective irrigation networks of Calabria (Southern Italy)

    Science.gov (United States)

    Zema, Demetrio Antonio; Nicotra, Angelo; Tamburino, Vincenzo; Marcello Zimbone, Santo

    2017-04-01

    The availability of geodetic heads and considerable water flows in collective irrigation networks suggests the possibility of recovery potential energy using small hydro power plants (SHPP) at sustainable costs. This is the case of many Water Users Associations (WUA) in Calabria (Southern Italy), where it could theoretically be possible to recovery electrical energy out of the irrigation season. However, very few Calabrian WUAs have currently built SHPP in their irrigation networks and thus in this region the potential energy is practically fully lost. A previous study (Zema et al., 2016) proposed an original and simple model to site turbines and size their power output as well as to evaluate profits of SHPP in collective irrigation networks. Applying this model at regional scale, this paper estimates the theoretical energy production and the economic performances of SHPP installed in collective irrigation networks of Calabrian WUAs. In more detail, based on digital terrain models processed by GIS and few parameters of the water networks, for each SHPP the model provides: (i) the electrical power output; (iii) the optimal water discharge; (ii) costs, revenues and profits. Moreover, the map of the theoretical energy production by SHPP in collective irrigation networks of Calabria was drawn. The total network length of the 103 water networks surveyed is equal to 414 km and the total geodetic head is 3157 m, of which 63% is lost due to hydraulic losses. Thus, a total power output of 19.4 MW could theoretically be installed. This would provide an annual energy production of 103 GWh, considering SHPPs in operation only out of the irrigation season. The single irrigation networks have a power output in the range 0.7 kW - 6.4 MW. However, the lowest SHPPs (that is, turbines with power output under 5 kW) have been neglected, because the annual profit is very low (on average less than 6%, Zema et al., 2016). On average each irrigation network provides an annual revenue from

  18. Annual radiological environmental monitoring report: Watts Bar Nuclear Plant, 1991

    International Nuclear Information System (INIS)

    1992-04-01

    This report describes the preoperational environmental radiological monitoring program conducted by TVA in the vicinity of the Watts Bar Nuclear Plant (WBN) in 1991. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas that will not be influenced by plant operations. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. During plant operations, results from stations near the plant will be compared with concentrations from control stations and with preoperational measurements to determine potential impacts to the public. Exposures calculated from environmental samples were contributed by naturally occurring radioactive materials, from materials commonly found in the environment a a result of atmospheric fallout, or from the operation of other nuclear facilities in the area. Since WBN has not operated, there has been no contribution of radioactivity from the plant to the environment

  19. Annual radiological environmental monitoring report: Watts Bar Nuclear Plant, 1992

    International Nuclear Information System (INIS)

    1993-04-01

    This report describes the preoperational environmental radiological monitoring program conducted by TVA in the vicinity of the Watts Bar Nuclear Plant (WBN) in 1992. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas that will not be influenced by plant operations. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. During plant operations, results from stations near the plant will be compared with concentrations from control stations and with preoperational measurements to determine potential impacts to the public. Exposures calculated from environmental samples were contributed by naturally occurring radioactive materials, from materials commonly found in the environment as a result of atmospheric fallout, or from the operation of other nuclear facilities in the area. Since WBN has not operated, there has been no contribution of radioactivity from the plant to the environment

  20. The 'Les iles' small-hydro power plant - Summary analysis; Analyse sommaire. Petite centrale hydroelectrique de Sombeval 'Les iles' - Rapport 2008

    Energy Technology Data Exchange (ETDEWEB)

    Hausmann, M.

    2008-01-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the River Suze in the Swiss Jura Mountains. The installation is to be made at the site of a small dam that previously provided water for a water-wheel-driven sawmill. A fish-pass at the site is also foreseen. The report presents details on the hydrological data for the river and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as are the regulation of water levels and the removal of river sediment. The electricity production expected is discussed, as is the economic viability of the project.

  1. The HydroShare Collaborative Repository for the Hydrology Community

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of, and collaboration around, "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting our approach to making this system easy to use and serving the needs of the hydrology community represented by the Consortium of Universities for the Advancement of Hydrologic Sciences, Inc. (CUAHSI). Metadata for uploaded files is harvested automatically or captured using easy to use web user interfaces. Users are encouraged to add or create resources in HydroShare early in the data life cycle. To encourage this we allow users to share and collaborate on HydroShare resources privately among individual users or groups, entering metadata while doing the work. HydroShare also provides enhanced functionality for users through web apps that provide tools and computational capability for actions on resources. HydroShare's architecture broadly is comprised of: (1) resource storage, (2) resource exploration website, and (3) web apps for actions on resources. System components are loosely coupled and interact through APIs, which enhances robustness, as components can be upgraded and advanced relatively independently. The full power of this paradigm is the

  2. The political economy of Canadian hydro-electricity : between old provincial hydros and neoliberal regional energy regimes

    International Nuclear Information System (INIS)

    Netherton, A.

    2007-01-01

    In economic terms, hydro-electricity is considered as a quasi-staple, as it prone to the classic staples problem of excess capacity. However, neither water nor hydroelectricity in Canada is produced primarily for export markets. Hydroelectric systems are often thought of as politicized monopolies. This paper discussed changes that have occurred in hydroelectric organizations over time, as they have been governed by a formative mixed regime; postwar provincial hydro systems; a megaprojects regime; and an emerging sustainability regionalization regime. The origins of electricity generation and transmission in Canada were discussed, as well as the ecological footprint of large mega-projects on rivers. The development of provincial hydro monopolies during the mid- to late- twentieth century was also outlined, as well as the sustainability and regionalization regime that developed after 1990. During the mature staples period of the mid-century, rents in hydro-electric organizations were distributed through cheap rates to subsidize and facilitate the development of mass production and mass consumption. However, post-staples consumption has now replaced mass consumption, and demand side management is replacing earlier cheap power policies. Nonetheless, the lack of systematic integration of networks has led to inefficiencies. Provincial grids are now being integrated into interconnected North American regional networks regulated by the United States. It was concluded that the Canadian electricity regime is increasingly influenced by the the supranational role that the United States is playing in structuring markets. 83 refs

  3. The environmental impacts of peaking at hydropower plants

    International Nuclear Information System (INIS)

    Halleraker, Jo Halvard

    2001-01-01

    A recent energy act in Norway allows hydropower plants to be operated so that hydro peaking is permitted. However, it is uncertain how fish react to the variations in discharge and depth that follow hydro peaking. SINTEF Energy Research is cooperating with other research institutions to investigate the consequences of these variations on the biota. Among the research tools is an aqua channel which is an indoor laboratory flume where fish behaviour can be studied in detail. It has been constructed to provide the hydropower industry and public authorities with means of better determining the effects of hydro peaking. (author)

  4. Toronto Hydro annual report, 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Toronto Hydro is the electric utility serving about 219,000 customers in Toronto, Ontario. In 1992, the utility purchased 9.6 billion kWh of electricity from Ontario Hydro, down 3.6% from 1990. Energy sales totalled 9.2 billion kWh, down 4.1% from 1990. Retail electricity rates increased an average of 6.7% in 1992, in spite of an increase in Ontario Hydro's wholesale rate by 8.2%, due to better than anticipated financial results and cost-control measures. The decline in electricity purchases and sales are attributed to economic factors, which also contributed to an increase in the utility's provision for bad debts. The third year of a 13.8-kV conversion project was completed in 1992; this project is converting the existing 4 kV distribution system to the higher voltage since maintenance and repair of the existing system is costly and the equipment is becoming less reliable. New construction, refurbishing, and modernization of equipment were performed at a number of substations. Other improvements in 1992 are reported in the areas of management and engineering systems, personnel policies, work safety, and energy management. Financial statements are included. 11 figs., 4 tabs

  5. Distributionally robust hydro-thermal-wind economic dispatch

    International Nuclear Information System (INIS)

    Chen, Yue; Wei, Wei; Liu, Feng; Mei, Shengwei

    2016-01-01

    Highlights: • A two-stage distributionally robust hydro-thermal-wind model is proposed. • A semi-definite programing equivalent and its algorithm are developed. • Cases that demonstrate the effectiveness of the proposed model are included. - Abstract: With the penetration of wind energy increasing, uncertainty has become a major challenge in power system dispatch. Hydro power can change rapidly and is regarded as one promising complementary energy resource to mitigate wind power fluctuation. Joint scheduling of hydro, thermal, and wind energy is attracting more and more attention nowadays. This paper proposes a distributionally robust hydro-thermal-wind economic dispatch (DR-HTW-ED) method to enhance the flexibility and reliability of power system operation. In contrast to the traditional stochastic optimization (SO) and adjustable robust optimization (ARO) method, distributionally robust optimization (DRO) method describes the uncertain wind power output by all possible probability distribution functions (PDFs) with the same mean and variance recovered from the forecast data, and optimizes the expected operation cost in the worst distribution. Traditional DRO optimized the random parameter in entire space, which is sometimes contradict to the actual situation. In this paper, we restrict the wind power uncertainty in a bounded set, and derive an equivalent semi-definite programming (SDP) for the DR-HTW-ED using S-lemma. A delayed constraint generation algorithm is suggested to solve it in a tractable manner. The proposed DR-HTW-ED is compared with the existing ARO based hydro-thermal-wind economic dispatch (AR-HTW-ED). Their respective features are shown from the perspective of computational efficiency and conservativeness of dispatch strategies.

  6. Hydropower plants as provider of TSO purchased services using the example of E.ON Wasserkraft GmbH; Wasserkraft als Netzdienstleister am Beispiel der E.ON Wasserkraft GmbH

    Energy Technology Data Exchange (ETDEWEB)

    Brucker, Michael [E.ON Wasserkraft GmbH, Landshut (Germany)

    2012-07-01

    Hydro power plants provide comprehensive TSO purchased services for the 50-Hz-grid as well as for the 16.7-Hz-grid of Deutsche Bahn (German Railway). Within the E.ON generation portfolio in Germany hydro power plants achieve the lion's share of revenues in TSO purchased services (primary control, secondary control, minute reserve). Although the possibility to build new hydro generation capacities is limited in Germany by nature, it is possible to increase the offer for TSO purchased services. This paper explains the different aspects of TSO purchases services provided by hydro power plants. (orig.)

  7. Ontario Hydro looks at security

    International Nuclear Information System (INIS)

    Green, B.J.; Kee, B.

    1995-01-01

    Ontario Hydro operates 20 CANDU reactors on three different sites. Since 1984, a review of security arrangements on all the sites has taken place on a five-yearly basis. The review process for 1995 is outlined. The three objectives were as follows: to assess current security threats and risks to the stations; to assess the adequacy of the existing programme to protect against current threats; by comparing the security programme against those of comparable entities to establish benchmarks for good practice as a basis for improvements at Ontario Hydro. Valuable insights gained through the review are listed. These could be useful to other utilities. (UK)

  8. Performance of Generating Plant: Managing the Changes. Part 2: Thermal Generating Plant Unavailability Factors and Availability Statistics

    Energy Technology Data Exchange (ETDEWEB)

    Curley, G. Michael [North American Electric Reliability Corporation (United States); Mandula, Jiri [International Atomic Energy Agency (IAEA)

    2008-05-15

    The WEC Committee on the Performance of Generating Plant (PGP) has been collecting and analysing power plant performance statistics worldwide for more than 30 years and has produced regular reports, which include examples of advanced techniques and methods for improving power plant performance through benchmarking. A series of reports from the various working groups was issued in 2008. This reference presents the results of Working Group 2 (WG2). WG2's main task is to facilitate the collection and input on an annual basis of power plant performance data (unit-by-unit and aggregated data) into the WEC PGP database. The statistics will be collected for steam, nuclear, gas turbine and combined cycle, hydro and pump storage plant. WG2 will also oversee the ongoing development of the availability statistics database, including the contents, the required software, security issues and other important information. The report is divided into two sections: Thermal generating, combined cycle/co-generation, combustion turbine, hydro and pumped storage unavailability factors and availability statistics; and nuclear power generating units.

  9. Interconnected hydro-thermal systems - Models, methods, and applications

    DEFF Research Database (Denmark)

    Hindsberger, Magnus

    2003-01-01

    to be performed where the uncertainty of the inflow to the hydro reservoirs is handled endogenously. In this model snow reservoirs have been added in addition to the hydro reservoirs. Using this new approach allows sampling based decomposition algorithms to be used, which have proved to be efficient in solving...

  10. The Ontario Hydro approach to assuring quality in nuclear heat exchanger tubing

    International Nuclear Information System (INIS)

    Maka, E.P.

    1982-01-01

    Ontario Hydro utilizes the CANDU PHWR reactor system. The heat transport system circulates pressurized heavy water through the reactor fuel channels to remove heat produced by the fission of uranium fuel. Heavy water is used for the heat transport medium because it is the most efficient liquid from the standpoint of neutron economy. The heat is carried by the reactor coolant to the steam generators where it is transferred to the light water side to form steam which drives the turbine generators. Many heat exchangers are incorporated in the heat transfer cycle. Their integrity is of prime importance both for the reliability of the power plant and for economic reasons since the loss of heavy water at $300/kg is a substantial penalty. This integrity depends largely on the quality of the heat exchanger tubing and where major heat exchangers are involved, it has been the Ontario Hydro policy to supply tubing to heat exchanger manufacturers on a ''free issue'' basis. This allows better control over the level of inspection perform

  11. Deconstructing hydro: the BC electricity sector in this decade

    International Nuclear Information System (INIS)

    Jaccard, M.

    2001-01-01

    This paper provided speculation regarding the world-wide trend to deregulate electric utilities with particular focus on power deregulation in British Columbia. The four main issues facing electricity reform in British Columbia are to determine if publicly-owned assets should be privatised, how to achieve competitive electricity commodity prices in a de-regulated generation market, to determine the extent to which customers will be allowed direct access to sellers of electricity, and to determine which changes in industry structure are needed to ensure that control over the common carrier does not hinder fair competition. BC Hydro recently issued a plan for the next decade entitled the Integrated Electricity Plan which suggests that almost all growth in supply on the Hydro system will be limited to a few large projects totalling 900 megawatts, to be owned and operated by either BC Hydro or by the Columbia Power Corporation, another Crown entity. This plan is in complete contrast to the evolution of the electricity industry nearly everywhere else in the world where demand growth is being met almost entirely by small- and medium-scale non-utility resources issuing from competitive markets with minimal public funding. This article looks at why BC Hydro will probably be transformed significantly, even dismantled, in the coming decade. The article begins with a section explaining the cause and effects of major changes in the world-wide electricity industry. This is followed by a section reviewing what BC Hydro did in the 1990s while reform was taking place. The article also describes what BC Hydro intends to do in the next decade and explores reasons why this outcome is unlikely. The final section of the article provides an alternative vision of BC Hydro's future over the next decade. 1 tab., 3 figs

  12. HydroPak: concept design and analysis of a packaged cross-flow turbine

    International Nuclear Information System (INIS)

    2004-01-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed

  13. The Hetex small-scale hydro plant

    International Nuclear Information System (INIS)

    Guentert, P.; Boller, F.; Wanner, A.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the 400 kW small hydroelectric power plant (SHP) installed on the Aabach stream in Niederlenz, Switzerland. With a maximum water-flow of 4.5 m 3 /s, the turbine can produce about 1.5 GWh of electricity per year. In spring 2005, bearing damage necessitated substantial renovation to the turbine and the generator. This study examines the state of the rest of the plant noted during maintenance work. It also focuses on the feeding of the electricity produced into the grid, the effects of increased residual water-flow, the option of using the Hallwilersee lake as a buffer, upstream flood evacuation and the possibility of green electricity certification. The calculation of the amount of water available is discussed. Due to inconsistent data, a corrected flow-duration curve was used. For the local river authorities, the through passage for fish from the Aare river up to the Hallwilersee has a high priority. The Hetex SHP weir is one of nine barriers to a direct connection. The planning of a fish-pass to be built in 2006 is discussed

  14. Analysis of a pico tubular-type hydro turbine performance by runner blade shape using CFD

    Science.gov (United States)

    Park, J. H.; Lee, N. J.; Wata, J. V.; Hwang, Y. C.; Kim, Y. T.; Lee, Y. H.

    2012-11-01

    There has been a considerable interest recently in the topic of renewable energy. This is primarily due to concerns about environmental impacts of fossil fuels. Moreover, fluctuating and rising oil prices, increase in demand, supply uncertainties and other factors have led to increased calls for alternative energy sources. Small hydropower, among other renewable energy sources, has been evaluated to have adequate development value because it is a clean, renewable and abundant energy resource. In addition, small hydropower has the advantage of low cost development by using rivers, agricultural reservoirs, sewage treatment plants, waterworks and water resources. The main concept of the tubular-type hydro turbine is based on the difference in water pressure levels in pipe lines, where the energy which was initially wasted by using a reducing valve at the pipeline of waterworks, is collected by turbine in the hydro power generator. In this study, in order to acquire the performance data of a pico tubular-type hydro turbine, the output power, head and efficiency characteristics by different runner blade shapes are examined. The pressure and velocity distributions with the variation of guide vane and runner vane angle on turbine performance are investigated by using a commercial CFD code.

  15. Hydro-Quebec's Strategic Plan 2002-2006 : summary

    International Nuclear Information System (INIS)

    2001-01-01

    A corporate profile of Hydro-Quebec was presented and the strategy that the utility will adopt for the 2002-2006 period was summarized. The utility plans to maintain its service quality and sustain environmental quality while developing a world class enterprise. Quebec has adopted a heritage pool giving Quebec consumers access to a maximum of 165 TWh of electricity per year at an average commodity rate of 2.79 cents per kilowatt-hour, the lowest rate for such a large amount of energy in North America. Above that volume, supply for the Quebec market will be ensured through competitive bidding, leading to the signing of supply contracts based on market price. Hydro-Quebec's strategy reflects the business opportunities open to Hydro-Quebec given its traditional activities in the province, the restructuring of North American energy markets, and the emergence of Quebec as a major energy hub. The business opportunities come from the fact that demand for electricity in Quebec is growing and from the opening of markets close to Quebec. Investment outlook in hydroelectric generation and transmission also appears to be profitable. It is likely that investment will be needed to build infrastructure. Hydro-Quebec is also working with its qualified workforce to develop a world-class international activity base. tabs., figs

  16. HydroViz: evaluation of a web-based tool for improving hydrology education

    Science.gov (United States)

    Habib, E.; Ma, Y.; Williams, D.; Sharif, H.; Hossain, F.

    2012-02-01

    HydroViz is a web-based, student-centered, highly visual educational tool designed to support active learning in the field of Engineering Hydrology. The development of HydroViz is informed by recent advances in hydrologic data, numerical simulations, visualization and web-based technologies. An evaluation study was conducted to determine the effectiveness of HydroViz, to examine the buy-in of the program, and to identify project components that need to be improved. A total of 182 students from seven freshmen and junior-/senior-level undergraduate classes in three universities participated in the study over the course of two semesters (spring 2010 and fall 2010). Data sources included homework assignments, online surveys, and informal interviews with students. Descriptive statistics were calculated for homework and the survey. Qualitative analysis of students' comments and informal interview notes were also conducted to identify ideas and patterns. HydroViz was effective in facilitating students' learning and understanding of hydrologic concepts and increasing related skills. Students had positive perceptions of various features of HydroViz and they believe that HydroViz fits well in the curriculum. The experience with HydroViz was somewhat effective in raising freshmen civil engineering students' interest in hydrology. In general, HydroViz tend to be more effective with students in junior- or senior-level classes than students in freshmen classes. There does not seem to be obvious differences between different universities. Students identified some issues that can be addressed to improve HydroViz. Future adaptation and expansion studies are under planning to scale-up the application and utility of HydroViz into various hydrology and water-resource engineering curriculum settings.

  17. Your energy team : Hydro Mississauga 1998 annual report

    International Nuclear Information System (INIS)

    1999-01-01

    An operational and financial review of Hydro Mississauga for fiscal year 1998 is presented. Hydro Mississauga has been serving the municipality of Mississauga, Ontario for the past 82 years. In 1998, Hydro Mississauga went through major restructuring to include a new competitive 'Services' Division which offers a wide range of competitive products and services. Despite deregulation and restructuring, quality of service was maintained and all-time performance records were set for company safety and system reliability. Operating costs were also cut and low rates continued. The residential rate freeze will be extended for a sixth straight year into 1999. Consolidated financial statements show that in 1998 Hydro Mississauga was 100 per cent debt free. One of the top priorities for the utility in 1998 was to get ready to deal with any problem that might arise as we roll over into the year 2000. The utility has completed an inventory of all computer software and equipment and has taken measures such as remediation, testing and getting vendor assurances. tabs., figs

  18. Present status of micro and mini-hydel power plants and biogas plants in Pakistan

    International Nuclear Information System (INIS)

    Hussain, T.

    1997-01-01

    The Government of Pakistan has high priority to develop indigenous energy resources and announced a policy framework and package of incentives to private sector in hydro electric power generation. Hydro electric power in Pakistan has been estimated to be nearly 35,000 MW, whereas only 3330 MW have so far been exploited which constitutes only 15.11% share of the total commercial energy fuel consumption in 1994-95 and 42.7% of total electricity generation. The Government Agency in Pakistan i.e. WAPDA which produced 85.4% electricity generation had found it difficult to implement and run small hydro projects. There are 200 MHP plants were installed with a total capacity of 3,000 KW (3 MW), out of which 160 plants are working with 80% success rate. The selling price is Rs. 3.00 against cost of production is Rs. 0.11 per unit. Biogas is a clean and cheap fuel in the form of gas. The total dung available per day in the rural areas of Pakistan works out between 250-300 million Kg and 1804 million cubic m. of biogas can be produced having economic value of 6.711 billions. During 70's several biogas plants were installed but they have some problems. As regards biogas the production has remained stagnant for the last 5 years or more. There is need for clear governmental priorities and effective use of form biogas. (A.B.)

  19. Sustainability Challenge of Micro Hydro Power Development in Indonesia

    Science.gov (United States)

    Didik, H.; Bambang, P. N.; Asep, S.; Purwanto, Y. A.

    2018-05-01

    Rural electrification using renewable energy is the best choice for many locations that far away from national grid. Many renewable energy project have been built for rural electrification such as micro hydro power plant (MHPP) and solar photovoltaic (SPV). Sustainability still the main challenge of off-grid renewable energy development for off-grid rural electrification in Indonesia. The objective of this paper is to review sustainability of micro hydro power development in Indonesia. The research method was done by field observation, interview with MHPP management, and reviewing some research about MHPP in Indonesia. Sustainability issues include various aspects that can be classified into 5 dimensions: technical, economic, socio-cultural, institutional, and environmental. In technical factors that lead to sustainability problem are: improper MHPP design and construction, improper operation and maintenance, availability of spare parts and expertise. In the economic dimension are generally related to: low electricity tariff and utilization of MHPP for productive use. In the social dimension are: the growth of consumer’s load exceeding the capacity, reduced number of consumers, lack of external institutional support. In the institutional side, it is generally related to the ability of human resources in managing, operating and maintaining of MHPP. Environmental factors that lead the sustainability problems of MHPP are: scarcity of water discharge, conflict of water resources, land conversion over the watershed, and natural disasters.

  20. ExternE - valuation of hydro power in Klippen. Final report

    International Nuclear Information System (INIS)

    Nilsson, Maans

    1998-08-01

    ExternE is a pan E uropean project aimed at identifying and quantifying external effects from different energy production technologies around Europe. The Swedish implementation carried out case studies on a biomass plant, a coal plant and a hydro power plant. The conventional approach within the ExternE project is to estimate impacts for each priority pathway associated with the fuel cycle, and then economic methods to obtain estimates for the economic damage of each particular impact pathway. However, in the case of hydro power, it is generally not possible to estimate the most important impacts quantitatively. Therefore, a contingent valuation (CV) study was initiated. In a typical CV-study, a selection of individuals are asked to state their willingness to pay for a certain environmental improvement or to avoid an environmental damage. Welfare economic theory suggests that the well-being effects on people from a change from one situation to another can be measured as their willingness to pay or to accept an economic transaction for this change. Environmental services, such as those provided by a river system, are public services and have generally no market price, but the analyst can use people's stated preferences to determine the correct prices of environmental goods and services. The CV study was initiated to obtain an externality value for Klippens Kraftstation. The performed study was of Ex Ante type, which means estimating the values before the exploitation. For this purpose, a site similar to Klippen but without exploitation, was selected: Vojmaan. Three groups of respondents; the local population, the tourists, and the average Swede, were asked to state their perspective on hydro power development their WTP for preserving Vojmaan in its current condition. The results indicate that Locals and Tourists differ significantly from Swedes. The average willingness to pay is calculated from the respondents who absolutely will pay, and those who maybe pay. The

  1. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  2. Analysis of the Hydro-Quebec development plan 1992-2010

    International Nuclear Information System (INIS)

    Bernard, J.-T.; Genest-Laplante, E.

    1994-01-01

    In November 1992, the Quebec provincial utility Hydro-Quebec presented its development plan for the 1992-2010 period and shortly thereafter introduced its 1993-1995 energy efficiency commitments. The plan is analyzed using a model that incorporates the main institutional features of electricity price setting. Two scenarios are constructed. The first incorporates Hydro-Quebec's electricity demand forecast and the second allows electricity demand to respond to its price. A comparative analysis shows that electricity demand in the province should increase faster than forecast by Hydro-Quebec until 2010. In fact, demand could exceed the predicted level by ca 16 TWh, or 8.6%. This larger increase is due to a fall in the real price of electricity, itself caused by a government imposed fall in the real unit cost of the utility's operation. This last constraint is the real challenge faced by Hydro-Quebec. 12 refs., 7 tabs

  3. Full cost accounting for decision making at Ontario Hydro

    International Nuclear Information System (INIS)

    Plagiannakos, T.

    1996-01-01

    Ontario Hydro's approach to full cost accounting (FCA) was outlined in response to questions raised earlier, in another forum, regarding Ontario Hydro's views on FCA. FCA was defined as an evaluation framework (as opposed to an accounting system) which tries to account for the internal (private) as well as the external (environment and human health) costs and benefits and integrate them into business decisions. When the external impacts cannot be monetized, qualitative evaluations are used based on the damage costing approach, which Ontario Hydro prefers to the cost of control method recommended by its critics. In general, however, Ontario Hydro is not opposed to FCA in so far as it puts the Utility in a better position to make more informed decisions, improve environmental cost management, avoid future costs, enhance revenue, improve environmental quality, contribute to environmental policy, and contribute to sustainable development. 1 fig

  4. HydroPak: concept design and analysis of a packaged cross-flow turbine

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed.

  5. Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Pousinho, H.M.I.; Mendes, V.M.F.

    2010-01-01

    This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach.

  6. HydroShare: A Platform for Collaborative Data and Model Sharing in Hydrology

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of and collaboration around "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting its use as a virtual environment supporting education and research. HydroShare has components that support: (1) resource storage, (2) resource exploration, and (3) web apps for actions on resources. The HydroShare data discovery, sharing and publishing functions as well as HydroShare web apps provide the capability to analyze data and execute models completely in the cloud (servers remote from the user) overcoming desktop platform limitations. The HydroShare GIS app provides a basic capability to visualize spatial data. The HydroShare JupyterHub Notebook app provides flexible and documentable execution of Python code snippets for analysis and modeling in a way that results can be shared among HydroShare users and groups to support research collaboration and education. We will discuss how these developments can be used to support different types of educational efforts in Hydrology where being completely web based is of value in an educational setting as students can all have access to the same functionality regardless of their computer.

  7. Small hydro in Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2011-10-01

    Full Text Available hydro, the author has started an online database of small hydropower projects in eastern and southern Africa. The main aim of the database is to catalogue the current situation and to make that accessible to policymakers, project developers, as well...

  8. BLUE GOLD: HYDRO-ELECTRIC RENT IN CANADA

    OpenAIRE

    Glenn Jenkins; RICHARD ZUKER

    1984-01-01

    In this study, an attempt is made to develop estimates of the value of economic rent from production of hydro-electricity. These estimates are made for the year 1979, which is the latest period for which a comprehensive set of data was available at the time this work was undertaken. The estimates are developed for the hydro-electricity generated (or used) by electric utilities in four provinces: Quebec (including Churchill Falls), Ontario, Manitoba and British Columbia. These electric systems...

  9. More than energy: Ontario Hydro final annual report, January 1998 - March 1999

    International Nuclear Information System (INIS)

    1999-01-01

    Ontario Hydro ceased operations on March 31, 1999 and its assets and functions were transferred by provincial statute to two successor corporations: Ontario Power Generation Corp. (OPG) and Ontario Hydro Services Inc. Its functions were also transferred to the Independent Electricity Market Operator and the Electrical Safety Authority, two not-for-profit agencies. The original act defining Ontario Hydro was replaced by the Energy Competition Act, 1998. Until the demerger of the company on April 1, 1999, Ontario Hydro served 108 direct industrial clients, almost one million retail clients and 255 municipal utilities. Ontario Power Generation inherited Ontario Hydro's generating portfolio, making it one of the largest power producers in North America in terms of installed capacity. The OPG system includes 69 hydroelectric stations, three nuclear sites, and six operating fossil fueled stations. Total installed system capacity is approximately 31,000 megawatts, and Ontario Hydro's total sales in 1998 were almost 139 terawatt hours. Ontario Hydro Services Company is an energy services-based transmission and distribution company. It owns and maintains 29,000 km of transmission lines, 114,700 km of distribution lines, 245 km of high-voltage underground cable, 256 transformer stations, 928 distribution and regulation stations, and 250 microwave stations. It also retains the retail business held by Ontario Hydro, which serves over 950,000 clients, and the transmission and generating business for 23 remote communities in Northern Ontario

  10. Micro-hydro power: reviewing an old concept

    Energy Technology Data Exchange (ETDEWEB)

    Alward, R.; Eisenbart, S.; Volkman, J.

    1979-01-01

    This informaion package has been prepared to respond to an increasing number of requests for information on micro-hydro systems. It contains a resource directory, which is an attempt to put the reader in contact with the literature, plans, people, and companies appropriate to needs. On a world-wide basis, small-scale, environmentally benign, mechanical, and electrical hydropower systems are common. These are the systems for individual homes, farm, and shop use and generally have power outputs less than 100 kW. For convenience in terminology, this scale of hydro power is referred to as micro-hydro. A decision tree is first presented followed by information on determining the suitability of th site, equipment, economics, sources for financial assistance, regulatory conflicts, cautions and suggestions for the Do-It-Yourselfer, and the Self-Installer, manufacturers and suppliers, and sources of professional services. An annotated bibliography of 16 references is provided. (MCW)

  11. B.C. Hydro : 1997 annual report

    International Nuclear Information System (INIS)

    1997-01-01

    Operating and financial information from B.C. Hydro for 1997 is presented. B.C. Hydro is the third largest electric utility in Canada. The utility generates between 43,000 and 54,000 gigawatt-hours of electricity annually. More than 80 per cent of the electricity is produced by major hydroelectric generating stations on the Columbia and Peace rivers. This report presents a picture of improved financial performance, details of all revenues and expenditures and capsule summaries of the Utility's operations. The report also addresses issues regarding strategic direction, local and international competition, and consultation and regulatory activities. tabs. and figs

  12. First decade: TVA's first ten years of nuclear power plant design and construction experience

    International Nuclear Information System (INIS)

    Willis, W.F.

    1978-01-01

    This paper reviews the experience of the Tennessee Valley Authority's design and construction program for nuclear power plants in terms of schedule and capital costs in three separate phases. Phase one recapitulates the status of the nuclear power industry in 1966 and sets forth the assumptions used for estimating capital costs and projecting schedules for the first Tennessee Valley Authority units. Phase two describes what happened to the program in the hectic early 1970s in terms of expansion of scope (particularly for safety features), the dramatic increase in regulatory requirements, vendor problems, stretchout of project schedules, and unprecented inflation. Phase three addresses the assumptions used today in estimating schedules and plant costs for the next 10-year period. 7 figures, 7 tables

  13. Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-03-15

    This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach. (author)

  14. Video game experience and its influence on visual attention parameters: an investigation using the framework of the Theory of Visual Attention (TVA).

    Science.gov (United States)

    Schubert, Torsten; Finke, Kathrin; Redel, Petra; Kluckow, Steffen; Müller, Hermann; Strobach, Tilo

    2015-05-01

    Experts with video game experience, in contrast to non-experienced persons, are superior in multiple domains of visual attention. However, it is an open question which basic aspects of attention underlie this superiority. We approached this question using the framework of Theory of Visual Attention (TVA) with tools that allowed us to assess various parameters that are related to different visual attention aspects (e.g., perception threshold, processing speed, visual short-term memory storage capacity, top-down control, spatial distribution of attention) and that are measurable on the same experimental basis. In Experiment 1, we found advantages of video game experts in perception threshold and visual processing speed; the latter being restricted to the lower positions of the used computer display. The observed advantages were not significantly moderated by general person-related characteristics such as personality traits, sensation seeking, intelligence, social anxiety, or health status. Experiment 2 tested a potential causal link between the expert advantages and video game practice with an intervention protocol. It found no effects of action video gaming on perception threshold, visual short-term memory storage capacity, iconic memory storage, top-down control, and spatial distribution of attention after 15 days of training. However, observations of a selected improvement of processing speed at the lower positions of the computer screen after video game training and of retest effects are suggestive for limited possibilities to improve basic aspects of visual attention (TVA) with practice. Copyright © 2015 Elsevier B.V. All rights reserved.

  15. Multiple account benefit-cost evaluation of the Burrard Thermal Generating Plant

    International Nuclear Information System (INIS)

    2001-04-01

    The government of British Columbia commissioned a multiple account benefit-cost analysis of the Burrard Thermal Generating Plant to ensure that the power production is in the economic and environmental interest of the province. The power plant consists of 6 natural gas-fired generating units with a combined capacity of 950 MW. It has been updated in recent years to reduce local emissions and to increase plant availability and reliability. Burrard has contributed in a major way to BC Hydro's net revenues, but there have been concerns that BC Hydro's purchases of natural gas for the power plant have contributed to the sharp increases in natural gas prices in 2001. There have also been concerns about air emissions from Burrard, including greenhouse gases and nitrous oxides. Historically, the plant has been beneficial, but this report will determine if it is in the provincial interest to continue operation of Burrard or to turn to alternative scenarios. The alternatives include constraining Burrard's output, or shutting it down and replacing it with other resources and repowering the plant with more efficient combined cycle gas turbine technology. In the constrained scenario, Burrard output and net exports are reduced. In the repowering scenario, investment and output at Burrard is increased. The financial consequences of these impacts are measured by their effect on the net system costs of meeting BC Hydro's load. The report demonstrated that it would not be in the overall interest of the province to constrain the operation of Burrard or shut it down. It was recommended that BC Hydro should review in detail the repowering option for Burrard, and that the government should consider imposing an emission charge reflecting the estimated damage costs associated with local pollutants generated at Burrard. The revenues would be used to fund offset measures in the Lower Fraser Valley airshed. 29 refs., 29 tabs., 3 appendices

  16. Fifteen years of radioactive waste management at Ontario Hydro

    International Nuclear Information System (INIS)

    Carter, T.J.; Rao, P.K.M.

    1985-01-01

    Ontario Hydro is a large Canadian utility producing 84% (7394 MWe) of the Nuclear Electricity generated in Canada. The low- and intermediate-level radioactive wastes generated by the Ontario Hydro program are currently being managed at the Bruce Nuclear Power Development with various volume reduction, packaging and interim storage systems. Ontario Hydro also owns and operates a radioactive waste transportation system. Studies are in progress for final disposal of these wastes in a suitable geology in Ontario. Since its inception in 1971, Ontario Hydro's radioactive waste management program has evolved into providing a full fledged radioactive waste management capability to the utility's two nuclear generation centres at Pickering and Bruce, and later in the decade, to Darlington. This paper summarizes the various developments in this program; highlights the major facilities both in-service and planned to be built; reviews the experiences gained over fifteen years of in-house waste management; and discusses the proposed reorientation towards ultimate disposal of these wastes. 2 refs., 8 figs., 1 tab

  17. Genotoxicity and antigenotoxicity study of aqueous and hydro-methanol extracts of Spondias mombin L., Nymphaea lotus L. and Luffa cylindrical L. using animal bioassays

    OpenAIRE

    Oyeyemi, Ifeoluwa Temitayo; Yekeen, Olaide Maruf; Odusina, Paul Olayinka; Ologun, Taiwo Mary; Ogbaide, Orezimena Michelle; Olaleye, Olayinka Israel; Bakare, Adekunle A.

    2015-01-01

    Spondias mombin (Linn), Nymphaea lotus (Linn) and Luffa cylindrica (Linn) (syn Luffa aegyptiaca Mill) are plants traditionally used as food ingredients and in the management of diseases, including cancer, in Nigeria. Despite the therapeutic potentials attributed to these plants, reports on their genotoxicity are scanty. In this study, the genotoxicity of the aqueous and hydro-methanol extract of these plants was evaluated using mouse bone marrow micronucleus and sperm morphology assays. Antig...

  18. Hydro in the Kyoto era

    International Nuclear Information System (INIS)

    Bourdon, M.-C.

    2003-01-01

    Quebec has the best performance in North America in terms of greenhouse gas (GHG) emissions. Unlike neighbouring provinces and states which rely heavily on coal for power generation, Quebec generates 96 per cent of its electricity from hydroelectric power. However, no new dams have been built in the past decade in Quebec due to land disputes with Aboriginal communities and general distrust among many ecologists. It takes about 12 years for a hydroelectric project to come to fruition. For that reason, and in order to capitalize on energy market opportunities, Hydro-Quebec is seriously considering expanding its generating capability beyond the needs of Quebec consumers, with gas-fired thermal generating stations. Environmental groups claim that the proposal to build the Suroit combined-cycle facility near the United States border destroys Quebec's efforts to honour the Kyoto Protocol. Economists argue that it is entirely in the spirit of Kyoto if exports of hydroelectricity or natural gas from Canada to the United States leads to less use of oil or coal. But one energy modeling expert at INRS-Energie et Materiaux claims that Quebec has a moral obligation to develop hydroelectricity for its own use as well as for export purposes, noting that any country with the good fortune to have renewable forms of energy, such as wind and hydro, should develop them to lower world GHG emissions. Quebec has many opportunities to sell hydroelectricity even while domestic demand grows. Hydroelectricity from Quebec should interest some states that have adopted their own GHG reduction standards, despite the U.S. government's refusal to ratify Kyoto. It should also interest Ontario and the Maritimes because they will be trying to reduce emissions from their thermal plants. The current situation does not favour the Kyoto Protocol. Exports of electricity from Quebec have dropped because no new dams have been built in recent years and gas-fired plants are looking more attractive to power

  19. Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China

    Directory of Open Access Journals (Sweden)

    Xinshuo Zhang

    2018-04-01

    Full Text Available How to effectively use clean renewable energy to improve the capacity of the power grid to absorb new energy and optimize the power grid structure has become one of China’s current issues. The Yalong River Wind-PV-Hydro complementary clean energy base was chosen as the research object from which to analyze the output complementarity principle and characteristics of wind farms, photovoltaic power plants, and hydropower stations. Then, an optimization scheduling model was established with the objective of minimizing the amount of abandoned wind and photovoltaic power and maximizing the stored energy in cascade hydropower stations. A Progress Optimality Algorithm (POA was used for the short-term optimal operation of Wind-PV-Hydro combinations. The results show that use of cascaded hydropower storage capacity can compensate for large-scale wind power and photovoltaic power, provide a relatively sustained and stable power supply for the grid. Wind-PV-Hydro complementary operation not only promotes wind power and photovoltaic power consumption but also improves the efficiency of using the original transmission channel of hydropower. This is of great significance to many developing countries in formatting a new green approach, realizing low-carbon power dispatch and trade and promoting regional economic development.

  20. Marginal-cost pricing for Hydro-Quebec residential customers

    International Nuclear Information System (INIS)

    Paquin, C.

    1994-02-01

    An option available to governments and to utilities such as Hydro-Quebec for responding to objectives of energy efficiency is the adoption of marginal cost pricing. Compared to currently used price structures, marginal cost pricing will allow improvement of price signals and assure an optimal utilization of the resource. That type of pricing could be economically beneficial but may not be desirable from the point of view of revenue distribution. Taking account of Hydro-Quebec's cost structure, pure marginal cost pricing would generate an income that would be strongly contested on equity grounds. For example, it would raise prices 60% for residential customers. Faced with this possibility, an analysis is presented of the impact of a peak-offpeak pricing (or pure marginal cost pricing) on Hydro-Quebec's residential customer energy bills. The marginal costs of Hydro-Quebec are calculated by the method of Bernard and Chatel (1985) and analysis of the results is based on Friedman and Weare (1993). A sample of 28,417 residential customers from a 1989 Hydro-Quebec survey is used in the study. Two scenarios are analyzed; the first allowing comparison of the energy bill only on the basis of marginal costs and of average costs, and the second allowing comparison of the impact of marginal cost pricing on the total bill. In the first scenario, the impact translates into a 31% increase in energy bills for the entire customer class considered; in addition, this impact is inversely proportional to the revenue class. In the second scenario, the increase is 24%. 33 refs., 10 figs., 53 tabs

  1. Trickle water and feeding system in plant culture and light-dark cycle effects on plant growth

    Science.gov (United States)

    Takano, T.; Inada, K.; Takanashi, J.

    1987-01-01

    Rockwool, as an inert medium covered or bagged with polyethylene film, can be effectively used for plant culture in space stations. The most important machine is the pump adjusting the dripping rate in the feeding system. Hydro-aeroponics may be adaptable to a space laboratory. The shortening of the light-dark cycles inhibits plant growth and induces an abnormal morphogenesis. A photoperiod of 12 hr dark may be needed for plant growth.

  2. PCB management at Manitoba Hydro's Waverley Service Centre

    International Nuclear Information System (INIS)

    Rempel, R.G.; Engstrom, T.

    1996-01-01

    Manitoba Hydro was the first Canadian utility to initiate a program to decontaminate insulating oil contaminated with polychlorinated biphenyls (PCBs). This paper describes Manitoba Hydro's recovery, reuse and recycling program, operated out of the utility's Waverley Service Centre (WSC). The WSC is a central facility serving to phase out and and destroy PCBs which remain in Manitoba Hydro's electrical system. Several hundred thousand litres of PCB-contaminated insulating oil are decontaminated annually at the WSC. The decontaminated oil is then reconditioned for reuse within the system operations. A PCBX unit was purchased from Sun Ohio for the decontamination of insulating oils containing PCBs. PCB decontamination is achieved through a chemical dechlorination treatment process. The PCBX treatment unit and the PCB storage building were described. 18 refs., 8 figs

  3. Higher profits, lower bills : a new electricity strategy for Hydro-Quebec

    International Nuclear Information System (INIS)

    2010-01-01

    Quebec is the fourth largest producer of hydro-electricity in the world, and has among the lowest electricity rates in North America. In 2008, 89 percent of the electricity produced by Hydro-Quebec was sold in the province, and the remainder was exported. In 2009, the electric utility released its strategic plan for 2009 to 2013. Hydro-Quebec's net profits are forecast to decline by 24 percent by 2013 and electricity rates are forecast to rise by 8.5 percent. Since Hydro-Quebec has already developed all of the province's low-cost hydroelectric resources, it can no longer increase profits and lower rates by building new hydropower production stations. In order to continue to prosper, the utility will invest in energy efficiency and better coordination of its power system with Ontario's. Increased electricity exports from Hydro-Quebec will help both Ontario and the United States reduce their greenhouse gas emissions by displacing fossil power generation. 25 refs., 2 tabs., 3 figs.

  4. ENVIRONMENTAL TECHNOLOGY VERIFICATION: JOINT (NSF-EPA) VERIFICATION STATEMENT AND REPORT HYDRO COMPLIANCE MANAGEMENT, INC. HYDRO-KLEEN FILTRATION SYSTEM, 03/07/WQPC-SWP, SEPTEMBER 2003

    Science.gov (United States)

    Verification testing of the Hydro-Kleen(TM) Filtration System, a catch-basin filter designed to reduce hydrocarbon, sediment, and metals contamination from surface water flows, was conducted at NSF International in Ann Arbor, Michigan. A Hydro-Kleen(TM) system was fitted into a ...

  5. Evaluating a biomass resource: The TVA region-wide biomass resource assessment model

    Energy Technology Data Exchange (ETDEWEB)

    Downing, M.; Graham, R.L. [Oak Ridge National Lab., TN (United States)

    1993-12-31

    The economic and supply structures of short rotation woody crop (SRWC) markets have not been established. Establishing the likely price and supply of SRWC biomass in a region is a complex task because biomass is not an established commodity as are oil, natural gas and coal. In this study we project the cost and supply of short-rotation woody biomass for the TVA region -- a 276 county area that includes all of Tennessee and portions of 10 contiguous states in the southeastern United States. Projected prices and quantities of SRWC are assumed to be a function of the amount and quality of crop and pasture land available in a region, expected SRWC yields and production costs on differing soils and land types, and the profit that could be obtained from current conventional crop production on these same lands. Results include the supply curve of SRWC biomass that is projected to be available from the entire region, the amount and location of crop and pasture land that would be used, and the conventional agricultural crops that would be displaced as a function of SRWC production. Finally, we show the results of sensitivity analysis on the projected cost and supply of SRWC biomass. In particular, we examine the separate impacts of varying SRWC production yields.

  6. How would the privatization of Hydro-Quebec make Quebecers richer?

    International Nuclear Information System (INIS)

    Garcia, C.

    2009-02-01

    In 1962, a total of 46 companies shared Quebec's electricity production, involving no less than 9,710 megawatts of power. The 4 companies that controlled 85 per cent of this power were Hydro-Quebec, Aluminum Company of Canada (Alcan), Shawinigan Water and Power Company and the Gatineau Power Company. At the time, electricity rates also varied considerably throughout Quebec, being extremely high in regions far from Montreal, which hindered potential industrial development in those areas. This report discussed the privatization of Hydro-Quebec and how it could make Quebecers richer. The report discussed the early days of electricity in Quebec and outlined the reasons that led Quebec to nationalize the production and distribution of electricity and to entrust its management to Hydro-Quebec. A summary of the developments undertaken to enable Hydro-Quebec to substantially boost its exports to the United States following liberalization of the American market toward the end of the twentieth century was also provided. A comparison group of companies in the United States involved in the production, transmission and distribution of electricity was also presented in order to analyze Hydro-Quebec's performance from various standpoints. Other topics that were addressed in the report included operational efficiency; use of capital; the experience of the United Kingdom; the rise in electricity rates; a strategy for privatization; the public offering; and protecting Quebec electricity consumers. The role of the Quebec government and of Hydro-Quebec were also examined. Electricity exports and electricity and aluminum smelters were also assessed. The report noted that Hydro-Quebec's annual profit would shrink from $2,882 million to $709 million if it had to pay the market price for the electricity it obtains from Churchill Falls. 23 tabs., 1 fig., 2 appendices

  7. Rural hydro technology

    International Nuclear Information System (INIS)

    Fowlie, M.

    1999-01-01

    This paper examines the increasing use of micro hydroelectric schemes for power generation in mountainous communities in Asia to alleviate some of the pressures on forests. An example of such a scheme in Pakistan is given, and the installation and operation of small hydro units, socio-economic factors, and the impact of the projects on the position of women in the community are discussed. (UK)

  8. Navigating the hydro market in Latin America

    International Nuclear Information System (INIS)

    Yermoli, C.A.

    1995-01-01

    The governments of most Latin American countries have yet to establish clear policies about the future ownership of existing generation assets, but they do expect future capacity to be largely developed by the private sector. There were at one time plans for many government-financed hydro projects in the area, but these projects produced much paper and little electricity. Present trends will take the area toward independent power projects, both hydro projects and thermal power projects. This article is a review of those present trends

  9. Annual radiological environmental monitoring report, Watts Bar Nuclear Plant

    International Nuclear Information System (INIS)

    1988-05-01

    This report describes the preoperational environmental radiological monitoring program conducted by TVA in the vicinity of the Watts Bar Nuclear Plant (WBN) in 1988. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas that will not be influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. During plant operations, results from stations near the plant will be compared with concentrations from control stations and with preoperational measurements to determine potential impacts to the public. The exposures calculated from environmental samples were contributed by naturally occurring radioactive materials, from materials commonly found in the environment as a result of atmospheric fallout, or from the operation of other nuclear facilities in the area. Since WBN has not operated, there has been no contribution of radioactivity from the plant to the environment. 4 refs., 2 figs., 1 tab

  10. Comparative study of the essential oil and hydrolate composition of Lythrum salicaria L. obtained by hydro-distillation and microwave distillation methods

    Directory of Open Access Journals (Sweden)

    A. Manayi

    2014-04-01

    Full Text Available Essential oils are considered as very complex natural mixtures containing numerous components at quite various concentrations. Lythrum salicaria has not been previously subjected to examination of its volatile oil. The present study was carried out to evaluate the essential oil composition of the flowering aerial parts of the plant by using conventionally hydro-distillation (HD and microwave assisted hydro-distillation (MAH methods along with the aromatic water obtained by hydro-distillation. Components of these three samples were recognized by GC/MS. Identification of components resulted in recognition of 14 (98% oil, 32 (98.4%, and 10 (95.5% compounds for HD, its hydrolate, and MAH samples, respectively. The predominant constituents in the HD oil were bis (2-ethylhexyl phthalate (29.2%, n-hexadecanoic acid (22%, and pentacosane (9.5%. The major constituents of the hydrolate were elucidated as 2(4H-benzofuranone-5,6,7,7a-tetrahydro-4,4,7a-trimethyl (6.4%, neryl acetone (6%, pentanoic acid (5.7%, nonanoic acid (5.6%, and octanoic acid (5.5%. Accordingly, bis (2-ethylhexyl phthalate (43.2%, methyl-cyclopentane (36.5%, and pentacosane (4.7% were assessed as the main components of MAH oil. Comparing the three samples compositions, it was concluded that the extraction procedure led to variations in quality and quantity of volatiles. Besides, bis (2-ethylhexyl phthalate, the common plasticizer, was identified as the main pollutant in both HD and MAH oils. The presence of this substance in the oils provided the evidence of contaminations that was absorbed from water into the plant suggesting GC/MS as a suitable method for its detection in plant materials.

  11. Field establishment and grain yield of maize affected by hydro-priming of differentially aged seeds

    Directory of Open Access Journals (Sweden)

    Kazem Ghassemi-Golezani

    2017-02-01

    Full Text Available A sub-sample of maize seeds (cv. SC-AR68 with a 100% germination was kept as control, and two other sub-samples were artificially deteriorated at 40 °C for 2 and 3 days, reducing normal germination to 98% and 93%, respectively. Consequently, three seed lots of maize with different levels of vigor were provided. Each seed lot was then divided into four sub-samples, one unprimed and the other three lots were primed in distilled water at 15 °C for 7, 14 and 21 hours, and then dried back to initial moisture content (about 20% at a room temperature of 20–22 °C for 24 hours. The field experiment was arranged as factorial based on randomized complete block design with three replications. Although germination percentage of seed lots was not significantly affected by hydro-priming, germination rate and seedling dry weight were considerably enhanced as a result of seed priming. Hydro-priming for 21 hours enhanced seedling emergence rate of all seed lots with different levels of vigor. This hydro-priming duration also increased grain yield of maize by about 32%, although this superiority was not statistically significant. This advantage in grain yield of plants from primed seeds was related with rapid germination and seedling growth and early emergence in the field.

  12. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  13. Thai-Myanmar joint hydro schemes

    Energy Technology Data Exchange (ETDEWEB)

    Boonpiraks, S [Electricity Generating Authority of Thailand, Nonthaburi (Thailand)

    1992-10-01

    A brief overview is presented here of planned cooperation between Thailand and Myanmar to harness the hydro resources available along the border of the two countries. This would reduce their dependence on thermal generation. (author).

  14. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    International Nuclear Information System (INIS)

    Jidin, Razali; Othman, Bahari

    2013-01-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  15. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    Science.gov (United States)

    Jidin, Razali; Othman, Bahari

    2013-06-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  16. BC Hydro's transmission business : transition to a competitive marketplace

    International Nuclear Information System (INIS)

    Threlkeld, R.J.

    1998-01-01

    Progress made by BC Hydro to facilitate the use of the transmission system for wholesale electricity transactions, including the separation of the system operation function from generation and merchant functions, was discussed. BC Hydro, Canada's third largest electric utility, was the first Canadian utility to offer open access to its transmission system for wholesale transactions. The utility has an installed generating capacity of about 10.8 gigawatts, 90 per cent of which is hydroelectric. The remainder is thermal, gas turbine and stationary and mobile diesel generation. The key element in establishing wholesale transmission transactions was the FERC-mandated open access same-time information system (OASIS) on which BC Hydro posts available transmission capacity, planned outages and pricing. The system operates on BC Hydro's internet node and interfaces to a Transmission Scheduling System (TSS). The TSS was developed in-house to handle the increased complexity of scheduling multiple energy and capacity transactions for users of the transmission system. Operation of the system and the challenge to constantly improve it were discussed

  17. Planning and running of the hydro aggregates in the electric power system in the R. Macedonia

    International Nuclear Information System (INIS)

    Ilijovski, Igor

    2015-01-01

    The subject of the research in this master thesis is analysis of the main characteristics and control of the large Hydropower plants (HPPs) in the electric power system in R. Macedonia, which are subject to planning in the running tables. ELEM and MEPSO are using SCADA system for monitoring and control of the hydropower plants. The planning is a complex process where many aspects should be covered. With correct and optimal control of the hydro aggregates, depending on the hydrology, climate, elevation of the reservoirs and many other conditions, a better efficiency of the water resources usage may be obtained, which results in positive financial outcomes. (author)

  18. Natural resources: adjusting and innovating - Hydro-Quebec in the global age

    International Nuclear Information System (INIS)

    Ouellet, D.

    1995-01-01

    Although it is believed that the information economy is replacing the mass economy, many companies continue to grow on economies based on natural resources. Recent aggressive growth by Hydro-Quebec in the highly competitive market for energy products was singled out as one of the success stories. Among other things, Hydro-Quebec was reported to focus attention on the globalization of electricity products, particularly in Asia, Europe and Africa. The corporation was said to cooperate with other utilities companies such as Ontario Hydro and Power Asia Assets Corporation to diversify its markets abroad. Hydro-Quebec is also marketing new products, developed in its laboratories and by subsidiaries, such as power system simulators and power system planning and management systems, on a global scale

  19. CAP--a combined codes, alarms and paging system--effective in nuclear and fossil-fueled power plants

    International Nuclear Information System (INIS)

    Foster, W.M.; Anderson, M.E.

    1981-01-01

    The CAP system now employed in two TVA power generating facilities has proven to be effective in both operational and emergency alerting and voice communications. Alternatives to emergency signalling point to advantages of a distributed amplifier/speaker system providing multi-signal and voice capabilities. Inclusion of a CAP-type system in all nuclear and fossil-fueled power plants is recommended, particularly in view of new NCR emergency alerting guidelines recently published. Outdoor-area warning is also included. Paper No. 80 JPGC 803-7

  20. Texaco, carbide form hydrogen plant venture

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Texaco Inc. and Union Carbide Industrial Gases Inc. (UCIG) have formed a joint venture to develop and operate hydrogen plants. The venture, named HydroGEN Supply Co., is owned by Texaco Hydrogen Inc., a wholly owned subsidiary of Texaco, and UCIG Hydrogen Services Inc., a wholly owned subsidiary of UCIG. Plants built by HydroGEN will combine Texaco's HyTEX technology for hydrogen production with UCIG's position in cryogenic and advanced air separation technology. Texaco the U.S. demand for hydrogen is expected to increase sharply during the next decade, while refinery hydrogen supply is expected to drop. The Clean Air Act amendments of 1990 require U.S. refiners to lower aromatics in gasoline, resulting in less hydrogen recovered by refiners from catalytic reforming units. Meanwhile, requirements to reduce sulfur in diesel fuel will require more hydrogen capacity

  1. 75 FR 45607 - Application To Export Electric Energy; Manitoba Hydro

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-281-B] Application To Export Electric Energy; Manitoba Hydro AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Manitoba Hydro (Manitoba) has applied to renew its authority to transmit electric energy from the...

  2. Concept of underground nuclear power plant

    International Nuclear Information System (INIS)

    Onishi, Sotoaki

    1976-01-01

    The concept of constructing nuclear power plants on the sea or underground as the future sitting is based on moving the present power plants on the ground with actual results to the sea or underground without changing the design. The underground nuclear power plants have many similar points to underground hydro-electric power stations with many achievements in the construction viewpoint, though they have their proper difficult problems. Of course, it requires to excavate larger underground caves than the case of underground hydro-electric power plants. The maximum dimensions of the caves have been determined through experience in practice. Therefore the developments of design theory and construction technique are desirable in this field. In discussing underground construction, two evaluating methods are considered for the shielding effect of base rocks. The minimum vertical distance up to ground surface from the center of the cave differs depending upon the in-cave pressure, and the conditions of base rock, soil and underground water in case of the accident assumed in the design, and is approximately 60m, if the cave is assumed to be an indefinite cylindrical shape, by the safer side calculation in the above two evaluations. (Wakatsuki, Y.)

  3. The hydro-mechanical modeling of the fractured media

    International Nuclear Information System (INIS)

    Kadiri, I.

    2002-10-01

    The hydro-mechanical modeling of the fractured media is quite complex. Simplifications are necessary for the modeling of such media, but, not always justified, Only permeable fractures are often considered. The rest of the network is approximated by an equivalent continuous medium. Even if we suppose that this approach is validated, the hydraulic and mechanical properties of the fractures and of the continuous medium are seldom known. Calibrations are necessary for the determination of these properties. Until now, one does not know very well the nature of measurements which must be carried out in order to carry on a modeling in discontinuous medium, nor elements of enough robust validation for this kind of modeling. For a better understanding of the hydro-mechanical phenomena in fractured media, two different sites have been selected for the work. The first is the site of Grimsel in Switzerland in which an underground laboratory is located at approximately 400 m of depth. The FEBEX experiment aims at the in-situ study of the consecutive phenomena due to the installation of a heat source representative of radioactive waste in the last 17 meters of the FEBEX tunnel in the laboratory of Grimsel. Only, the modeling of the hydro-mechanical of the excavation was model. The modeling of the Febex enabled us to establish a methodology of calibration of the hydraulic properties in the discontinuous media. However, this kind of study on such complex sites does not make possible to answer all the questions which arise on the hydro-mechanical behavior of the fractured media. We thus carried out modeling on an other site, smaller than the fist one and more accessible. The experimental site of Coaraze, in the Maritime Alps, is mainly constituted of limestone and fractures. Then the variation of water pressure along fractures is governed by the opening/closure sequence of a water gate. Normal displacement as well as the pore pressure along these fractures are recorded, and then

  4. Annual radiological environmental operating report, Browns Ferry Nuclear Plant, 1988

    International Nuclear Information System (INIS)

    1989-04-01

    This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of Browns Ferry Nuclear Plant in 1988. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. The vast majority of the exposures calculated from environmental samples were contributed by naturally occurring radioactive materials or from materials commonly found in the environment as a result of atmospheric nuclear weapons fallout. Small amounts of Co-60 were found in sediment samples downstream from the plant. This activity in stream sediment would result in no measurable increase over background in the dose to the general public. 3 refs., 2 figs., 2 tabs

  5. Hydro-Quebec line crew returns home from Haiti

    Energy Technology Data Exchange (ETDEWEB)

    Horne, D.

    2005-04-01

    This article recounted the experience of a 14-member Hydro-Quebec line crew and support group that travelled to Haiti in November 2004 to help re-establish essential electricity services. The work was conducted together with Electricite d'Haiti (EDH). The team installed 400 poles, 10 km of conductors and 85 transformers, restoring service to water pumps; La Providence and Raboteau hospitals; a centre housing Doctors without borders; a CARE distribution centre; and several convents and schools. The installation of street lights at strategic points allowed lighting to be restored in several districts of Gonaives. Hydro-Quebec was able to extend their mission to Haiti and purchase more poles and transformers with the help of a $500,000 contribution from the Canadian International Development Agency. Hydro-Quebec was the only company who came to the aid of EDH. The total budget for the project was $4 million. 2 figs.

  6. AECB staff annual assessment of the Bruce Heavy Water Plant for the year 1994

    International Nuclear Information System (INIS)

    1995-06-01

    This report is the Atomic Energy Control Board staff assessment of the operation of Bruce Heavy Water Plant (BHWP) during 1994. BHWP operation was acceptably safe in 1994. At BHWP, Ontario Hydro did not breach any of the regulations issued under the authority of the Atomic Energy Control Act. There were four minor violations of the BHWP Operating Licence. In all cases, Ontario Hydro exceeded Ontario Hydro government limits for releases to the environment. None of the events threatened public health or the environment. 2 figs

  7. Usability of a theory of visual attention (TVA) for parameter-based measurement of attention I: evidence from normal subjects

    DEFF Research Database (Denmark)

    Finke, Kathrin; Bublak, Peter; Krummenacher, Joseph

    2005-01-01

    four separable attentional components: processing speed, working memory storage capacity, spatial distribution of attention, and top-down control. A number of studies (Duncan et al., 1999; Habekost & Bundesen, 2003; Peers et al., 2005) have already demonstrated the clinical relevance......The present study investigated the usability of whole and partial report of briefly displayed letter arrays as a diagnostic tool for the assessment of attentional functions. The tool is based on Bundesen's (1990, 1998, 2002; Bundesen et al., 2005) theory of visual attention (TVA), which assumes...... of these parameters. The present study was designed to examine whether (a) a shortened procedure bears sufficient accuracy and reliability, (b) whether the procedures reveal attentional constructs with clinical relevance, and (c) whether the mathematically independent parameters are also empirically independent...

  8. Application of reliability methods in Ontario Hydro

    International Nuclear Information System (INIS)

    Jeppesen, R.; Ravishankar, T.J.

    1985-01-01

    Ontario Hydro have established a reliability program in support of its substantial nuclear program. Application of the reliability program to achieve both production and safety goals is described. The value of such a reliability program is evident in the record of Ontario Hydro's operating nuclear stations. The factors which have contributed to the success of the reliability program are identified as line management's commitment to reliability; selective and judicious application of reliability methods; establishing performance goals and monitoring the in-service performance; and collection, distribution, review and utilization of performance information to facilitate cost-effective achievement of goals and improvements. (orig.)

  9. Experimental investigation of fish downstream passage and turbine related fish mortality at an innovative hydro power setup

    International Nuclear Information System (INIS)

    Geiger, Franz; Cuchet, Mathilde; Rutschmann, Peter

    2016-01-01

    The fish downstream passage of small fish at the innovative TUM hydro shaft power plant concept was investigated experimentally. The behavior of 1974 inserted individuals of brown trout, grayling, barbel, minnow and bullhead of 45 mm to 220 mm body length was observed in a fully functional test setup which included a 35 kW Kaplan turbine and a horizontal screen with 20 mm bar clearance. The 24 h tests were conducted under nature like conditions whereas the laboratory environment also enabled targeted hydraulic situations and modifications of the bypass during the test series. A recapture rate of the fish of 99% and a subsequent 96 h observation period yielded detailed information about the migration behavior and instant as well as long term mortality. The results reveal the actual passage distribution of small fish between bypass and turbine and the turbine related injury and mortality rates in dependency of fish species, fish length, turbine discharge and bypass arrangement. General trends as well as species specific particularities could be deduced. The work confirms the suitability of the employed experimental approach and the ecological potential of the investigated hydro power plant concept. The behavioral barrier effect of the screen on small fish and the necessary of appropriate downstream migration corridor were proved and quantified. (authors)

  10. Hydro-Quebec International : taking up the challenges of globalization

    Energy Technology Data Exchange (ETDEWEB)

    Carpentier, J.M.

    1997-12-31

    With the ever increasing demand for electricity, it is estimated that the world`s electrical generating capacity will grow by about 1,000,000 MW over the next eight years. This represents a 40 per cent increase over today`s capacity. Hydro-Quebec is determined to stake its place in international markets and to maximize the profits from the strong expertise gained during the construction of Quebec`s major electric facilities. The venture into international markets is primarily a commercial strategy. To that effect, Hydro-Quebec plans to invest up to $300 million in international projects around the world so that after five years it can have major interests and assets totaling $12 billion or more. China, North Africa and the Middle East are some of the market that Hydro-Quebec wishes to enter in the years ahead. The Eastern European and Southeast Asian markets are also worthy of interest. It was pointed out that Hydro-Quebec is not the only large electric utility turning to world market to pursue its growth. French, Spanish and American companies are also presently investing billions of dollars in the world market.

  11. Hydro-Quebec International : taking up the challenges of globalization

    International Nuclear Information System (INIS)

    Carpentier, J.M.

    1997-01-01

    With the ever increasing demand for electricity, it is estimated that the world''s electrical generating capacity will grow by about 1,000,000 MW over the next eight years. This represents a 40 per cent increase over today''s capacity. Hydro-Quebec is determined to stake its place in international markets and to maximize the profits from the strong expertise gained during the construction of Quebec''s major electric facilities. The venture into international markets is primarily a commercial strategy. To that effect, Hydro-Quebec plans to invest up to $300 million in international projects around the world so that after five years it can have major interests and assets totaling $12 billion or more. China, North Africa and the Middle East are some of the market that Hydro-Quebec wishes to enter in the years ahead. The Eastern European and Southeast Asian markets are also worthy of interest. It was pointed out that Hydro-Quebec is not the only large electric utility turning to world market to pursue its growth. French, Spanish and American companies are also presently investing billions of dollars in the world market

  12. HydroCoils, occlusion rates, and outcomes: a large single-center study.

    LENUS (Irish Health Repository)

    O'Hare, A M

    2010-11-01

    The HydroCoil is an expansile hydrogel coil designed to produce a greater degree of volumetric packing within cerebral aneurysms when compared with bare platinum coils. This increased packing is, in turn, believed to decrease the risk of recurrence within aneurysms and hence the risk of their rupture in the long term. The aim of this work was to assess whether the use of HydroCoils and the proportion of HydroCoil used have any influence on the subsequent occlusion and recurrence rates of treated aneurysms.

  13. Estimation of small-scale hydroelectric power plant costs

    International Nuclear Information System (INIS)

    Santos, Afonso Henriques Moreira; Silva, Benedito Claudio da; Magalhaes, Ricardo Nogueira

    2010-01-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  14. Pico hydro turbines for electricity in rural areas

    OpenAIRE

    Descotte, Gérard

    2016-01-01

    This article discusses the feedback and lessons learned, particularly from a survey carried out following the deployment program of a pico hydro power solution in a very isolated rural area in north Laos. This project is part of the strategic development for the rural electrification of Laos, in which pico hydro power facilities constitute the main avenue of progress for the electrification of isolated villages.

  15. Safety Evaluation Report on Tennessee Valley Authority: Revised Corporate Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1987-07-01

    The TVA Corporate Nuclear Performance Plan addresses those corporate concerns identified by the NRC staff. Because much of the TVA corporate plan is programmatic, its effectiveness depends on its implementation, and the NRC staff plans to closely monitor this implementation. The NRC staff will address site-specific concerns in subsequent SERs on each volume of the Nuclear Performance Plan. On the basis of its review, the NRC staff finds TVA's revised Corporate Nuclear Performance Plan (Revision 4) acceptable. The NRC staff concludes that the organization and staffing of TVA's Office of Nuclear Power and the programmatic improvements in place or under way are sufficient, if implemented properly, to resolve the problems at the corporate level that led to issuance of the 10 CFR 50.54(f) letter dated September 17, 1985, and to support continuing TVA nuclear activities, including plant operations. 19 refs., 3 figs

  16. Applications of neural networks to monitoring and decision making in the operation of nuclear power plants

    International Nuclear Information System (INIS)

    Uhrig, R.E.

    1990-01-01

    Application of neural networks to monitoring and decision making in the operation of nuclear power plants is being investigated under a US Department of Energy sponsored program at the University of Tennessee. Projects include the feasibility of using neural networks for the following tasks: (1) diagnosing specific abnormal conditions or problems in nuclear power plants, (2) detection of the change of mode of operation of the plant, (3) validating signals coming from detectors, (4) review of ''noise'' data from TVA's Sequoyah Nuclear Power Plant, and (5) examination of the NRC's database of ''Letter Event Reports'' for correlation of sequences of events in the reported incidents. Each of these projects and its status are described briefly in this paper. This broad based program has as its objective the definition of the state-of-the-art in using neural networks to enhance the performance of commercial nuclear power plants

  17. Air toxics evaluation for a nuclear power plant

    International Nuclear Information System (INIS)

    Lokey, D.; Orr, W.

    1994-01-01

    An emission inventory of nonradiological hazardous air pollutants (HAP) was prepared for TVA's Browns Ferry Nuclear Plant (BFN). The purpose of this effort was to determine whether BFN is a major HAP emission source. About 40 specific HAP were identified in products used at FBN. HAP emission totals from BFN were estimated at 6 T/Y, well below the major-source cutoff. Off-site waste disposal reduced gross emission estimates by about 8 percent. HAP emission evaluation by product categories showed the largest portion due to paints and coatings, followed by cleaning compounds. HAP emission breakdown by chemical species showed xylene to be the predominate HAP emitted, followed by methyl ethyl ketone

  18. Report of the special prosecutor: BC Hydro 'Raiwind' project

    International Nuclear Information System (INIS)

    Fraser, P. D. K.

    1999-10-01

    A special prosecutor has been appointed by the British Columbia Government to assist the Royal Canadian Mounted Police (RCMP) in its investigation, and to render appropriate charging decisions in the matter of the circumstances surrounding the creation of IPC International Power Corporation (IPC) owned by a Mr. John N. Laxton, former Chairman of BC Hydro and his two children, and its joint venture with BC Hydro for the development of an international power project in Pakistan known as the Raiwind project. Of particular concerns were the conflict of interest breached by Mr. Laxton in loaning a substantial sum of money to a principal member of the Pakistani side of the joint venture, and by the former President and CEO of BC Hydro, Mr. John Sheehan, by his purchase of shares of IPC by a company owned by members of his family. In 1996 Mr. Sheehan's employment as President and CEO was terminated by BC Hydro for breaching internal conflict of interest guidelines and for failing to get approval from BC Hydro for the acquisition of IPC shares. Subsequently, Mr. Sheehan commenced an action against BC Hydro for wrongful dismissal, a claim which was upheld by the Supreme Court of British Columbia. The focus of the special prosecutor's criminal investigation ultimately became the conduct of Mr. Laxton and whether a charge could or should be laid under Section 122 of the Criminal Code. The outcome of his investigation, which is discussed in this report, was that there was no substantial likelihood of conviction under the breach or trust provisions of Section 122 with respect to the indirect purchases by Mr. Laxton of shares in IPC. Nor was there any reason to believe that a personal loan made in high-risk circumstances could be a benefit or advantage to the lender. Furthermore, the loan cannot be causally related to any loss or financial harm to BC Hydro. In fact, it could be argued that Mr. Laxton's private decision to make the loan was of real assistance in ensuring that the

  19. Cost-benefit analysis of Hydro-Quebec's energy conservation programs

    International Nuclear Information System (INIS)

    Arsenault, E.

    1993-09-01

    A cost-benefit analysis is presented of the energy conservation programs of Hydro-Quebec for 1991 to 2010. Three possible scenarios are simulated. In the first scenario, Hydro-Quebec data are used without modification. In the second, the simulation is carried out in the absence of the Hydro-Quebec programs, and in the third, it is assumed that any economies achieved are only for the short term. A comparison between these simulations allows determination of results concerning the advantages and the costs which the programs introduce for the three groups comprising society: the consumer, the producer, and the government. The results of these comparisons show that the consumer, the producer, and the whole society gain benefits from the energy conservation programs, while the government loses. 13 refs., 13 figs., 14 tabs

  20. Mission: Partnerships - A Socially Responsible Approach for New Hydro-electric Developments

    Energy Technology Data Exchange (ETDEWEB)

    Wojczynski, Ed; Cole, Victoria; Pachal, Shawna; Goulet, Richard

    2010-09-15

    Worldwide there is a desire for clean, secure and renewable energy developed in an environmentally and socially responsible manner. In the Canadian province of Manitoba, where water is an abundant resource, efforts are being undertaken by Manitoba Hydro to achieve this goal through the development of new hydro-electric generating stations in partnership with Aboriginal (indigenous) communities. This paper focuses on the lessons learned by Manitoba Hydro in developing and implementing partnership agreements with northern Aboriginal communities on two new generation projects - the Wuskwatim Generation Project and the Keeyask Generation Project.

  1. A long-term analysis of pumped hydro storage to firm wind power

    International Nuclear Information System (INIS)

    Foley, A.M.; Leahy, P.G.; Li, K.; McKeogh, E.J.; Morrison, A.P.

    2015-01-01

    Highlights: • This is a long term generation analysis of a high wind power system. • A high CO 2 and fossil fuel price is closest to Ireland’s EU ETS 2020 target. • New pumped storage to firm wind is limited unless strong market costs exist. • Reserve for wind power show that ancillary services are relevant for balancing. - Abstract: Although pumped hydro storage is seen as a strategic key asset by grid operators, financing it is complicated in new liberalised markets. It could be argued that the optimum generation portfolio is now determined by the economic viability of generators based on a short to medium term return on investment. This has meant that capital intensive projects such as pumped hydro storage are less attractive for wholesale electricity companies because the payback periods are too long. In tandem a significant amount of wind power has entered the generation mix, which has resulted in operating and planning integration issues due to wind’s inherent uncertain, varying spatial and temporal nature. These integration issues can be overcome using fast acting gas peaking plant or energy storage. Most analysis of wind power integration using storage to date has used stochastic optimisation for power system balancing or arbitrage modelling to examine techno-economic viability. In this research a deterministic dynamic programming long term generation expansion model is employed to optimise the generation mix, total system costs and total carbon dioxide emissions, and unlike other studies calculates reserve to firm wind power. The key finding of this study is that the incentive to build capital-intensive pumped hydro storage to firm wind power is limited unless exogenous market costs come very strongly into play. Furthermore it was demonstrated that reserve increases with increasing wind power showing the importance of ancillary services in future power systems

  2. The hydro energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Vachey, C.

    2000-05-01

    This paper is a first approach of the hydro energy energy. It presents the principle and the applications of this energy source. It proposes recommendations on the sizing and the cost estimation of an installation and the environmental impacts of this energy. (A.L.B.)

  3. Thermo-hydro-mechanical behaviour of Boom clay; Comportement thermo-hydro-mecanique de l'argile de Boom

    Energy Technology Data Exchange (ETDEWEB)

    Le, T.T

    2008-01-15

    This thesis studied the thermo-hydro-mechanical properties of Boom clay, which was chosen to be the host material for the radioactive waste disposal in Mol, Belgium. Firstly, the research was concentrated on the soil water retention properties and the hydro-mechanical coupling by carrying out axial compression tests with suction monitoring. The results obtained permitted elaborating a rational experimental procedure for triaxial tests. Secondly, the systems for high pressure triaxial test at controlled temperature were developed to carry out compression, heating, and shearing tests at different temperatures. The obtained results showed clear visco-elasto-plastic behaviour of the soil. This behaviour was modelled by extending the thermo-elasto-plastic model of Cui et al. (2000) to creep effect. (author)

  4. Towards A Grid Infrastructure For Hydro-Meteorological Research

    Directory of Open Access Journals (Sweden)

    Michael Schiffers

    2011-01-01

    Full Text Available The Distributed Research Infrastructure for Hydro-Meteorological Study (DRIHMS is a coordinatedaction co-funded by the European Commission. DRIHMS analyzes the main issuesthat arise when designing and setting up a pan-European Grid-based e-Infrastructure for researchactivities in the hydrologic and meteorological fields. The main outcome of the projectis represented first by a set of Grid usage patterns to support innovative hydro-meteorologicalresearch activities, and second by the implications that such patterns define for a dedicatedGrid infrastructure and the respective Grid architecture.

  5. New directions in nuclear waste disposal in Ontario Hydro

    International Nuclear Information System (INIS)

    Nash, K.

    1996-01-01

    Ontario Hydro Nuclear has financial, environmental, safety and public acceptance business objectives which must be met to achieve long term sustainable success. Short term objectives of achieving nuclear excellence in safety, cost and production are vital to this success. Ontario Hydro's nuclear waste and decommissioning liabilities must be managed within these objectives. This paper outlines the financial environmental and societal considerations and responsibility framework for managing these liabilities. (author)

  6. Using modular neural networks to monitor accident conditions in nuclear power plants

    International Nuclear Information System (INIS)

    Guo, Z.

    1992-01-01

    Nuclear power plants are very complex systems. The diagnoses of transients or accident conditions is very difficult because a large amount of information, which is often noisy, or intermittent, or even incomplete, need to be processed in real time. To demonstrate their potential application to nuclear power plants, neural networks axe used to monitor the accident scenarios simulated by the training simulator of TVA's Watts Bar Nuclear Power Plant. A self-organization network is used to compress original data to reduce the total number of training patterns. Different accident scenarios are closely related to different key parameters which distinguish one accident scenario from another. Therefore, the accident scenarios can be monitored by a set of small size neural networks, called modular networks, each one of which monitors only one assigned accident scenario, to obtain fast training and recall. Sensitivity analysis is applied to select proper input variables for modular networks

  7. Proposed Hydro-Quebec development plan, 1993: Proposal

    International Nuclear Information System (INIS)

    1992-01-01

    The Quebec government now requires Hydro-Quebec to submit a development plan every three years instead of annually, in order to permit more in-depth studies and a broader consultation with interested parties. In the first of such three-year plans, a series of plan proposals is presented which was developed after a year of consultation with various groups on four fundamental matters: energy efficiency, means of generation, electro-intensive industries, and electricity exports. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. Hydroelectricity will continue to be emphasized as the main source of generation since hydroelectric facilities offer distinct advantages in terms of costs, environmental impacts, and economic spinoffs. The proposed plan also presents objectives and strategies for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 5 figs., 15 tabs

  8. Ontario Hydro annual report 1986

    International Nuclear Information System (INIS)

    1987-04-01

    Ontario Hydro's annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics

  9. The passive system for reflooding of the VVER reactor core from the second-stage hydro-accumulators: design and basic design solutions

    International Nuclear Information System (INIS)

    Alexandr D Efanov; Sergey G Kalyakin; Andrey V Morozov; Oleg V Remizov; Vladimir M Berkovich; Victor N Krushelnitskiy; Vladimir G Peresadko; Yuri G Dragunov; Alexey K Podshibyakin; Sergey I Zaitcev

    2005-01-01

    Full text of publication follows: The fundamental difference in the safety assurance of the operating NPPs and those under design implies that the safety in the existing NPPs is achieved by energy-dependent (active) systems and depends on the proficiency of attending personnel. To provide safety, the new NPP designs use the physical processes proceeding in the facility without power supply; and they are unaffected by human errors. As to the safety level, the design of the new generation nuclear power plant NPP-92 relates to the class of the improved NPPs; and it applies a principle of diversity in the structure of systems responsible for critical safety functions. In accordance with the above-mentioned safety concept, the design development required a complex of experimental investigations and numerical modeling to be conducted. Among the passive safety systems of the NPP with RP-392 is the system of the second stage hydro-accumulators (GE-2). The system of the second-stage hydro-accumulators consists of four groups of hydro-accumulating tanks with a total coolant volume of 960 m 3 . The system is intended for the core flooding with coolant during 24 hours. In each group of the hydro-accumulators, the graded coolant flowrate is provided, which depends on residual heat in the reactor. The special check valves are tuned to open at the pressure drop in the circuit below 1.5 MPa. The paper presents the thermalhydraulic substantiation of the serviceability of the second-stage hydro-accumulators system for passive heat removal from the VVER reactor core and the basic design solutions on the GE-2 system. (authors)

  10. A confirmatory research approach to the measurement of EMI/RFI in commercial nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kercel, S.W. [Oak Ridge National Lab., TN (United States)

    1995-04-01

    The Oak Ridge National Laboratory (ORNL) is conducting confirmatory research on the measurement of electromagnetic/radio frequency interference (EMI/RFI) in nuclear power plants. While it makes a good beginning, the currently available research data are not sufficient to characterize the EMI/RFI environment of the typical nuclear plant. Data collected over several weeks at each of several observation points are required to meet this need. To collect the required data, several approaches are examined, the most promising of which is the relatively new technology of application specific spectral receivers. While several spectral receiver designs have been described in the literature, none is well suited for nuclear power plant EMI/RFI surveys. This paper describes the development of two receivers specifically designed for nuclear power plant EMI/RFI surveys. One receiver surveys electric fields between 5 MHz and 8 GHz, while the other surveys magnetic fields between 305 Hz and 5 MHz. The results of field tests at TVA`s Bull Run Fossil Plant are reported.

  11. A confirmatory research approach to the measurement of EMI/RFI in commercial nuclear power plants

    International Nuclear Information System (INIS)

    Kercel, S.W.

    1995-01-01

    The Oak Ridge National Laboratory (ORNL) is conducting confirmatory research on the measurement of electromagnetic/radio frequency interference (EMI/RFI) in nuclear power plants while it makes a good beginning, the currently available research data are not sufficient to characterize the EMI/RFI environment of the typical nuclear plant. Data collected over several weeks at each of several observation points are required to meet this need. To collect the required data, several approaches are examined, the most promising of which is the relatively new technology of application specific spectral receivers. While several spectral receiver designs have been described in the literature, none is well suited for nuclear power plant EMI/RFI surveys. This paper describes the development of two receivers specifically designed for nuclear power plant EMI/RFI surveys. One receiver surveys electric fields between 5 MHz and 8 GHz, while the other surveys magnetic fields between 305 Hz and 5 MHz. The results of field tests at TVA's Bull Run Fossil Plant are reported

  12. Computerized heat balance models to predict performance of operating nuclear power plants

    International Nuclear Information System (INIS)

    Breeding, C.L.; Carter, J.C.; Schaefer, R.C.

    1983-01-01

    The use of computerized heat balance models has greatly enhanced the decision making ability of TVA's Division of Nuclear Power. These models are utilized to predict the effects of various operating modes and to analyze changes in plant performance resulting from turbine cycle equipment modifications with greater speed and accuracy than was possible before. Computer models have been successfully used to optimize plant output by predicting the effects of abnormal condenser circulating water conditions. They were utilized to predict the degradation in performance resulting from installation of a baffle plate assembly to replace damaged low-pressure blading, thereby providing timely information allowing an optimal economic judgement as to when to replace the blading. Future use will be for routine performance test analysis. This paper presents the benefits of utility use of computerized heat balance models

  13. Environmental impact and benefit from hydro-energy: Bulgarian case

    International Nuclear Information System (INIS)

    Vesselinov, V.; Iotova, A.

    1996-01-01

    The present hydro energy system in Bulgaria has been constructed mainly in the period 1950-1965. The currently utilized hydro-power potential, only 33% of the estimated technical potential, includes 87 HPP operating in 1991. A complex assessment of the environmental impact of the hydro energy objects as well as a comparative analysis of all energy sources in Bulgaria is made in the framework of Bulgarian Case Study of the DECADES Inter-Agency Project. The main types of environmental impact related to HPP operation are presented in 7 specific categories: land requirements, changes in the landscape, hydrological changes, micro-climatic changes, geodynamic changes, risk from man-made activities; generation of new ecosystems. A technique of expertise in ball is proposed as a suitable quantitative approach for more precise assessment of impact on climate factors from different energy sources. 2 tabs., 5 refs

  14. Hydro Ottawa achieves Smart Meter milestone

    International Nuclear Information System (INIS)

    Anon.

    2008-01-01

    As Ontario's second largest municipal electricity company, Hydro Ottawa serves more than 285,000 residential and business customers in the city of Ottawa and the village of Casselman. Since 2006, the utility has installed more than 230,000 Smart Meters throughout its service territory in an effort to provide better services to its customers. This initiative represents the largest operational advanced metering infrastructure network in Canada. This move was necessary before time-of-use rates can be implemented in Ottawa. The Smart Meters deliver data wirelessly to Hydro Ottawa's Customer Information System for billing and eliminating manual readings. The Smart Meters are designed to promote more efficient use of electricity. The Government of Ontario has passed legislation requiring the installation of Smart Meters throughout the province by the end of 2010

  15. Multi-objective differential evolution with adaptive Cauchy mutation for short-term multi-objective optimal hydro-thermal scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Qin Hui [College of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China); Zhou Jianzhong, E-mail: jz.zhou@hust.edu.c [College of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China); Lu Youlin; Wang Ying; Zhang Yongchuan [College of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2010-04-15

    A new multi-objective optimization method based on differential evolution with adaptive Cauchy mutation (MODE-ACM) is presented to solve short-term multi-objective optimal hydro-thermal scheduling (MOOHS) problem. Besides fuel cost, the pollutant gas emission is also optimized as an objective. The water transport delay between connected reservoirs and the effect of valve-point loading of thermal units are also taken into account in the presented problem formulation. The proposed algorithm adopts an elitist archive to retain non-dominated solutions obtained during the evolutionary process. It modifies the DE's operators to make it suit for multi-objective optimization (MOO) problems and improve its performance. Furthermore, to avoid premature convergence, an adaptive Cauchy mutation is proposed to preserve the diversity of population. An effective constraints handling method is utilized to handle the complex equality and inequality constraints. The effectiveness of the proposed algorithm is tested on a hydro-thermal system consisting of four cascaded hydro plants and three thermal units. The results obtained by MODE-ACM are compared with several previous studies. It is found that the results obtained by MODE-ACM are superior in terms of fuel cost as well as emission output, consuming a shorter time. Thus it can be a viable alternative to generate optimal trade-offs for short-term MOOHS problem.

  16. Electrodeposition to construct free-standing chitosan/layered double hydroxides hydro-membrane for electrically triggered protein release.

    Science.gov (United States)

    Zhao, Pengkun; Zhao, Yanan; Xiao, Ling; Deng, Hongbing; Du, Yumin; Chen, Yun; Shi, Xiaowen

    2017-10-01

    In this study, we report the electrodeposition of a chitosan/layered double hydroxides (LDHs) hydro-membrane for protein release triggered by an electrical signal. The electrodeposition was performed in a chitosan and insulin loaded LDHs suspension in the absence of salt. A free-standing chitosan/LDHs hydro-membrane was generated on the electrode with improved mechanical properties, which is dramatically different from the weak hydrogel deposited in the presence of salt. The amount of LDHs in the hydro-membrane affects the optical transmittance and multilayered structure of the hybrid membrane. Compared to the weak chitosan/LDHs hydrogel, the hydro-membrane has a higher insulin loading capacity and the release of insulin is relatively slow. By biasing electrical potentials to the hydro-membrane, the release behavior of insulin can be adjusted accordingly. In addition, the chitosan/LDHs hydro-membrane showed no toxicity to cells. Our results provide a facile method to construct a chitosan/LDHs hybrid multilayered hydro-membrane and suggest the great potential of the hydro-membrane in controlled protein release. Copyright © 2017 Elsevier B.V. All rights reserved.

  17. Methodology for the selection of alternatives to the waterfall division of hydro graphical basin, considering environmental impacts

    International Nuclear Information System (INIS)

    Cunha, S.H.F. da; Pires, S.H.; Rovere, E.L. La; Pereira, M.V.F.

    1993-01-01

    This paper presents the many stages of a new methodology propose to selection of alternatives of waterfall division of hydro graphical basin considering environmental impacts. The methodology uses the techniques of hierarchical analysis in evaluation of environmental impacts, simulation the individualized power plants in energy evaluation and multi-objective analysis in selection of better alternative of division of basin waterfall. The methodology still foresee moments and mechanisms to take into account the opinion of different social sectors. (C.M.)

  18. Final environmental statement related to the operation of Watts Bar Nuclear Plant, Units 1 and 2: Docket Numbers 50-390 and 50-391, Tennessee Valley Authority. Supplement Number 1

    International Nuclear Information System (INIS)

    1995-04-01

    The Final Environmental Statement-Operating License (FES-OL) issued in 1978 represents the Nuclear Regulatory Commission's (NRC's) previous environmental review related to the operation of Watts Bar Nuclear (WBN) Plant. The NRC staff has determined that it is appropriate to re-examine the issues associated with the environmental review before issuance of an operating license. The purpose of this NRC review is to discuss the effects of observed changes in the environment and to evaluate the changes in environmental impacts that have occurred as a result of changes in the WBN Plant design and proposed methods of operations since the last environmental review. A full scope of environmental topics has been evaluated, including regional demography, land and water use, meteorology, terrestrial and aquatic ecology, radiological and non-radiological impacts on humans and the environment, socioeconomic impacts, and environmental justice. The staff concluded that there are no significant changes in the environmental impacts since the NRC 1978 FES-OL from changes in plant design, proposed methods of operations, or changes in the environment. The Tennessee Valley Authority's (TVA's) preoperational and operational monitoring programs were reviewed and found to be appropriate for establishing baseline conditions and ongoing assessments of environmental impacts. The staff also conducted an analysis of plant operation with severe accident mitigation design alternatives (SAMDAs) and concluded that none of the SAMDAs, beyond the three procedural changes that the TVA committed to implement, would be cost-beneficial for further mitigating environmental impacts

  19. Parametric distribution approach for flow availability in small hydro potential analysis

    Science.gov (United States)

    Abdullah, Samizee; Basri, Mohd Juhari Mat; Jamaluddin, Zahrul Zamri; Azrulhisham, Engku Ahmad; Othman, Jamel

    2016-10-01

    Small hydro system is one of the important sources of renewable energy and it has been recognized worldwide as clean energy sources. Small hydropower generation system uses the potential energy in flowing water to produce electricity is often questionable due to inconsistent and intermittent of power generated. Potential analysis of small hydro system which is mainly dependent on the availability of water requires the knowledge of water flow or stream flow distribution. This paper presented the possibility of applying Pearson system for stream flow availability distribution approximation in the small hydro system. By considering the stochastic nature of stream flow, the Pearson parametric distribution approximation was computed based on the significant characteristic of Pearson system applying direct correlation between the first four statistical moments of the distribution. The advantage of applying various statistical moments in small hydro potential analysis will have the ability to analyze the variation shapes of stream flow distribution.

  20. An evaluation of the Browns Ferry Nuclear Plant preventive maintenance program based on reliability centered maintenance analysis

    International Nuclear Information System (INIS)

    McCullough, C.L.; McCullough, C.A.

    1989-01-01

    Reliability centered maintenance (RCM) techniques were used to support a preventative maintenance (PM) upgrade program (PMUP) performed at TVA Browns Ferry Nuclear Plant (BFNP). The purpose of the RCM analysis was to identify critical equipment based on risk and economic importance and to evaluate the PM activities applicable to that equipment. The analysis may be conveniently divided into three steps, which will be outlined in the Approach section of this paper. The net benefit of the RCM approach was a prioritization of the focus of the PM upgrade program so that plant components receive attention proportional to their importance, and assurance that PM activities properly address the most likely component failure causes

  1. Ontario Hydro's transportation of radioactive material and emergency response plan

    International Nuclear Information System (INIS)

    Karmali, N.

    1993-01-01

    Ontario Hydro has been transporting radioactive material for almost 30 years without any exposure to the public or release to the environment. However, there have been three accidents involving Hydro's shipments of radioactive material. In addition to the quality packaging and shipping program, Ontario Hydro has an Emergency Response Plan and capability to deal with an accident involving a shipment of radioactive material. The Corporation's ability to respond, to effectively control and contain the situation, site remediation, and to provide emergency public information in the event of a road accident minimizes the risk to the public and the environment. This emphasizes their commitment to worker safety, public safety and impact to the environment. Response capability is mandated under various legislation and regulations in Canada

  2. Development of HydroImage, A User Friendly Hydrogeophysical Characterization Software

    Energy Technology Data Exchange (ETDEWEB)

    Mok, Chin Man [GSI Environmental; Hubbard, Susan [Lawrence Berkeley National Laboratory; Chen, Jinsong [Lawrence Berkeley National Laboratory; Suribhatla, Raghu [AMEC E& I; Kaback, Dawn Samara [AMEC E& I

    2014-01-29

    HydroImage, user friendly software that utilizes high-resolution geophysical data for estimating hydrogeological parameters in subsurface strate, was developed under this grant. HydroImage runs on a personal computer platform to promote broad use by hydrogeologists to further understanding of subsurface processes that govern contaminant fate, transport, and remediation. The unique software provides estimates of hydrogeological properties over continuous volumes of the subsurface, whereas previous approaches only allow estimation of point locations. thus, this unique tool can be used to significantly enhance site conceptual models and improve design and operation of remediation systems. The HydroImage technical approach uses statistical models to integrate geophysical data with borehole geological data and hydrological measurements to produce hydrogeological parameter estimates as 2-D or 3-D images.

  3. HydroCoil as an adjuvant to bare platinum coil treatment of 100 cerebral aneurysms

    International Nuclear Information System (INIS)

    Fanning, Noel F.; Berentei, Zsolt; Brennan, Paul R.; Thornton, John

    2007-01-01

    Introduction The overall safety of the HydroCoil, an expansile hybrid hydrogel-platinum coil, is unknown. We report a prospective observational study of our first 100 cerebral aneurysms treated with HydroCoils, focusing on safety and initial efficacy.Methods Indications, procedural complications, clinical and angiographic outcomes were recorded. Packing density, number of coils deployed and angiographic results were compared with those in a matched control group of 100 aneurysms treated solely with bare platinum coils. HydroCoil complication rates were compared to bare platinum coil rates at our institution and in published series. Results Adjuvant HydroCoil treatment led to increased mean percentage aneurysm filling compared to controls (50 ± 21% versus 27 ± 13%, P < 0.001). Immediate posttreatment angiographic results showed significantly (P < 0.001) more complete occlusions and fewer incomplete (<95%) occlusions compared to controls. Intermediate follow-up angiograms (median 7.5 months) in 63 aneurysms showed a trend towards fewer incomplete occlusions with HydroCoil treatment. There were significantly fewer major recurrences with HydroCoil treatment compared to the control treatment (9.5% versus 22.6%, P 0.046). In the adjuvant HydroCoil group, major recurrent aneurysms had significantly less percentage volume packing with HydroCoils than non-recurrent aneurysms (50.3 ± 5.0% versus 65.3 ± 18.0%, P = 0.04). There was a 12% procedural complication rate, 6% procedural morbidity and 1% mortality rate, similar to institutional and reported bare platinum coil complication rates.Conclusion HydroCoils can be safely deployed with a similar complication rate to bare platinum coils. They result in improved aneurysm filling. Intermediate follow-up angiography showed significantly fewer major recurrences. Long-term follow-up is required to confirm initial improved stability. (orig.)

  4. Hydro-Thermal Fatigue Resistance Measurements on Polymer Interfaces

    Science.gov (United States)

    Gurumurthy, Charan K.; Kramer, Edward J.; Hui, Chung-Yuen

    1998-03-01

    We have developed a new technique based on a fiber optic displacement sensor for rapid determination of hydro-thermal fatigue crack growth rate per cycle (da/dN) of an epoxy/polyimide interface used in flip chip attach microelectronic assembly. The sample is prepared as a trilayered cantilever beam by capillary flow of the epoxy underfill over a polyimide coated metallic beam. During hydro-thermal cycling the crack growth along the interface (from the free end) changes the displacement of this end of the beam and we measure the free end displacement at the lowest temperature in each hydro-thermal cycle. The change in beam displacement is then converted into crack growth rate (da/dN). da/dN depends on the maximum change in the strain energy release rate of the crack and the phase angle in each cycle. The relation between da/dN and maximum strain energy release rate characterizes the fatigue crack growth resistance of the interface. We have developed and used a simple model anhydride cured and a commercially available PMDA/ODA passivation for this study.

  5. Challenging hydro-hegemony

    DEFF Research Database (Denmark)

    Wessels, Josepha Ivanka

    2015-01-01

    Bank. Both case studies show that control over water resources and supply provides political power over others at local level. Yet non-violent resistance can be observed in these border areas. In border areas between Israel, Syria and Palestine, control over access and water supply plays an important...... role in the ability of Israel to exercise hegemonic power in daily hydro-politics, which in the long term is detrimental for the people and the environment and disrupts the hydrological balance in the entire Jordan River basin....

  6. Hydro-Quebec opens up, expects positive reaction from FERC

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1997-01-01

    Hydro-Quebec Energy Services US (HQUS), the marketing arm of Hydro-Quebec, amended its application for a power marketing licence with the Federal Energy Regulatory Commission (FERC), by offering to open up five per cent of the wholesale Quebec electricity market to competition. The Corporation hopes that its revised application will satisfy FERC to grant HQUS a power marketer licence, with the right to sell electricity in the US at market-based rates. Hydro-Quebec insiders believe that in addition to opening up the market to competition, thereby equalizing market conditions on both sides of the border, the Corporation's chances of receiving the licence also have been improved by the creation of the provincial energy board (Regie de l'energie) which in future will regulate electricity and gas transmission through Quebec, and establish transmission tariffs. FERC ruling is expected within 60 days of the March 7, 1997 amended application

  7. User experience with HydroHelp programs

    Energy Technology Data Exchange (ETDEWEB)

    Verner, J.S. [Brookfield Power, Gatineau, PQ (Canada)

    2009-07-01

    Advances in the field of geographical information systems (GIS) have simplified the process of finding suitable sites for new hydroelectric projects. However, estimating the construction cost remains a challenge. The HydroHelp program is a cost evaluation program developed specifically to determine if a project will be economically feasible. The program is made up of 4 programs, depending on the type of turbine suitable for the site. Once a turbine selection is made, users can choose the program according to Kaplan, Impulse or Francis turbines. Users must rely on GIS, since the program requires a thorough understanding of the site geology and topography. Knowledge of hydroelectric plants is also necessary in order to obtain a credible construction cost. This paper demonstrated the capacity and flexibility of the software along with its different functions and available options. A detailed cost breakdown can be obtained along with an energy estimate and project specifications. In addition, the software can be used to optimize the project through different options by changing the facility's layout in terms of the type of dam, spillway, conduit length and diameter, turbine type and flood level. 17 figs.

  8. Atmospheric pollution in the Tula Industrial Corridor studied using a bio monitor and nuclear analytical techniques

    Energy Technology Data Exchange (ETDEWEB)

    Martinez C, M. A.; Solis, C.; Andrade, E. [UNAM, Instituto de Fisica, Apdo. Postal 20-364, 01000 Mexico D. F. (Mexico); Beltran H, R. I. [Universidad Autonoma del Estado de Hidalgo, Centro de Investigaciones Quimicas, Carretera Pachuca-Tulancingo Km. 4.5, 42184 Pachuca, Hidalgo (Mexico); Issac O, K. [Universidad Autonoma del Estado de Mexico, Facultad de Medicina, Paseo Tollocan s/n, esq. Jesus Carranza, 50120 Toluca, Estado de Mexico (Mexico); Lucho C, C. A. [Universidad Politecnica de Pachuca, Carretera Pachuca-Cd. Sahagun Km. 20, Hidalgo (Mexico); Lopez R, M. C.; Longoria, L. C. [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2011-02-15

    This study deals with the application of nuclear analytical techniques to analyze trace elements in the biological monitor Tillandsia usneoides. Biological monitors provides an alternative advantageous way of particulate matter sampling in air pollution studies, since there is no need of special sampling devices, accumulation time can be as long as desired. T. usneoides, which occurs naturally throughout Mexico, was used to monitor air quality of Tula-Vito-Apasco (TVA) industrial corridor at central Mexico. This area is considered one of the critical zones of the country because of atmospheric contaminants high concentration. Particulate matter is regulated by Mexican norms, but its chemical composition is not. Plants were transplanted from a clean environment to four sites at the TVA corridor, and exposed for 12 weeks from February to April 2008. Trace element accumulation of plants was determined by particle induced X-ray emission and neutron activation analysis. Results reveal differences in trace elements distribution among sites in the TVA corridor. Furthermore, anthropogenic elements (S, V) and crustal elements (Ca) in T. usneoides exhibit high levels. Highly toxic elements such as Hg, As and Cr although present at trace levels, showed un enrichment relative to the initial values, when transplanted to the TVA corridor. Results show that monitoring with T. usneoides allows a first approximation of air sources to provide insights of the atmospheric pollution in the TVA corridor. (Author)

  9. Atmospheric pollution in the Tula Industrial Corridor studied using a bio monitor and nuclear analytical techniques

    International Nuclear Information System (INIS)

    Martinez C, M. A.; Solis, C.; Andrade, E.; Beltran H, R. I.; Issac O, K.; Lucho C, C. A.; Lopez R, M. C.; Longoria, L. C.

    2011-01-01

    This study deals with the application of nuclear analytical techniques to analyze trace elements in the biological monitor Tillandsia usneoides. Biological monitors provides an alternative advantageous way of particulate matter sampling in air pollution studies, since there is no need of special sampling devices, accumulation time can be as long as desired. T. usneoides, which occurs naturally throughout Mexico, was used to monitor air quality of Tula-Vito-Apasco (TVA) industrial corridor at central Mexico. This area is considered one of the critical zones of the country because of atmospheric contaminants high concentration. Particulate matter is regulated by Mexican norms, but its chemical composition is not. Plants were transplanted from a clean environment to four sites at the TVA corridor, and exposed for 12 weeks from February to April 2008. Trace element accumulation of plants was determined by particle induced X-ray emission and neutron activation analysis. Results reveal differences in trace elements distribution among sites in the TVA corridor. Furthermore, anthropogenic elements (S, V) and crustal elements (Ca) in T. usneoides exhibit high levels. Highly toxic elements such as Hg, As and Cr although present at trace levels, showed un enrichment relative to the initial values, when transplanted to the TVA corridor. Results show that monitoring with T. usneoides allows a first approximation of air sources to provide insights of the atmospheric pollution in the TVA corridor. (Author)

  10. Hydro Tasmania - renewable energy drivers, action and plans

    International Nuclear Information System (INIS)

    Gill, R.; Andrews, H.

    2005-01-01

    In Tasmania, the island state of Australia, the generator, Hydro Tasmania, is pushing technical, environmental and business boundaries in its plans to integrate a relatively high proportion (up to 20 percent) of large wind generators into its current complex mix of large and small hydropower plants. Its plans include projects to increase the efficiency of its older hydropower equipment as it prepares to supply much needed peaking capacity to the market in southern Australia via the groundbreaking Basslink undersea cable, which is due for completion in November 2005. Taken as a package these developments are creating a globally significant reference site for renewable energy systems. The paper will describe what is happening, and more importantly what is underpinning the developments, including: the harnessing of Tasmania's world-class wind resource, where recently constructed 1.75 MW wind turbines are achieving capacity factors of over 45 percent - some of the best productivity in the world today; the application of leading environmental science measures to ensure the sustainability of both the new wind farm developments and the transformation of the hydropower system to meet peak capacity demands; the relevance of the existing large hydropower storages that can operate in synergy with the wind resource; the contribution of Australia's renewable energy certificate scheme, which is effectively doubling the value of new renewable energy developments compared with existing generation sources; the application of the latest technology in hydropower turbines, combined with power system expertise from the world's leading manufacturers, to increase the efficiency of older hydropower generators, thereby more effectively harnessing the existing environmental footprint; and the transformation of Hydro Tasmania's business into a significant supplier and trader of premium value peak energy into the sophisticated Australian National Electricity Market. (author)

  11. Micro-hydro power in the UK: The role of communities in an emerging energy resource

    International Nuclear Information System (INIS)

    Bracken, L.J.; Bulkeley, H.A.; Maynard, C.M.

    2014-01-01

    Research around micro-hydro power is focused on technical aspects with limited understanding of the social organisation and environmental implications. We examine the ways in which micro-hydro is engaged by people and organisations as a means of contributing to the UK's policy ambition for renewable energy. We bring to the fore the way in which expertise is used and contested. A web based review of micro-hydro schemes in the UK was undertaken and a detailed evaluation of two schemes in the North of England was conducted to determine how expertise and contestation figures in community schemes. Results demonstrate a rapid expansion of micro-hydro in the UK. Ownership/control is highly ‘community based’. Until now research around micro-hydro has been dominated by technical approaches with schemes defined in terms of hardware. We propose a third dimension to Walker and Cass's (2007) classification of renewable energy developments: the environmental dimension. We suggest this dimension of micro-hydro is critical, both in terms of the extent to which resources can be realised but also the ways in which it might attract controversy, in particular around how expertise is used and valued. - Highlights: • Analysis of micro-hydro schemes in the UK demonstrates a recent rapid expansion. • We propose a third dimension to renewable energy developments: the environmental dimension. • The environmental dimension of micro-hydro determines how resources are realised. • Environmental features underpin the controversy which can emerge around schemes. • The ownership of micro-hydro schemes is highly ‘community based’

  12. Small hydro generation building block profile

    International Nuclear Information System (INIS)

    2003-01-01

    Concise business information on small hydro generation in British Columbia was presented in this document. It was noted that the steep terrain within the province and its abundant precipitation provides numerous opportunities for hydropower generation in British Columbia. The hydroelectric sector produces approximately 90 per cent of the electrical demand in the province. The document focusses on small hydro sites producing between 0.5 and 50 mega watts (MW) and not having large water storage. In the first section, an overview of the electricity sector in the province is provided. The following issues are examined in subsequent sections: land resources; infrastructure requirements; sales market; labour market; the regulatory regime; development factors; non-governmental aspects; investments and economics; the present status and future outlook of the industry; and, government revenue. Input-output tables were also provided. 22 refs., 5 tabs., 4 figs

  13. Operational and structural measures to reduce hydro-peaking impact on fish larvae

    International Nuclear Information System (INIS)

    Kopecki, Ianina; Schneider, Matthias

    2016-01-01

    Eco-hydraulic investigations studying the effects of hydro-peaking on river biota are gaining in importance. Negative effects of rapid flow fluctuations due to hydro power production are well documented by many studies, with the larvae and juvenile fish identified among the mostly affected life stages. Therefore, elaboration of efficient hydro-peaking mitigation strategies is an important issue for energy companies as well as for water body administrations responsible for the fulfilment of WFD requirements. The present case study strives for practical solutions allowing to minimize or compensate the negative effects of hydro-peaking on the fish fauna of the 7 km long river reach on the river Lech (southern Germany). Model based investigations allow to access the impact from currently authorized discharge regime, suggest operational and structural measures within the reach in terms of reducing the risk of stranding for fish larvae and select the measures most easy to implement and with the largest ecological benefit. The paper describes the approach for accessing the effects of hydro-peaking based on 2D hydrodynamic modelling, fuzzy logic based habitat modelling and information on cutting-edge biological investigations on fish larvae from Lunz experimental facility (Austria). (authors)

  14. Linking hydraulic traits to tropical forest function in a size-structured and trait-driven model (TFS v.1-Hydro

    Directory of Open Access Journals (Sweden)

    B. O. Christoffersen

    2016-11-01

    Full Text Available Forest ecosystem models based on heuristic water stress functions poorly predict tropical forest response to drought partly because they do not capture the diversity of hydraulic traits (including variation in tree size observed in tropical forests. We developed a continuous porous media approach to modeling plant hydraulics in which all parameters of the constitutive equations are biologically interpretable and measurable plant hydraulic traits (e.g., turgor loss point πtlp, bulk elastic modulus ε, hydraulic capacitance Cft, xylem hydraulic conductivity ks,max, water potential at 50 % loss of conductivity for both xylem (P50,x and stomata (P50,gs, and the leaf : sapwood area ratio Al : As. We embedded this plant hydraulics model within a trait forest simulator (TFS that models light environments of individual trees and their upper boundary conditions (transpiration, as well as providing a means for parameterizing variation in hydraulic traits among individuals. We synthesized literature and existing databases to parameterize all hydraulic traits as a function of stem and leaf traits, including wood density (WD, leaf mass per area (LMA, and photosynthetic capacity (Amax, and evaluated the coupled model (called TFS v.1-Hydro predictions, against observed diurnal and seasonal variability in stem and leaf water potential as well as stand-scaled sap flux. Our hydraulic trait synthesis revealed coordination among leaf and xylem hydraulic traits and statistically significant relationships of most hydraulic traits with more easily measured plant traits. Using the most informative empirical trait–trait relationships derived from this synthesis, TFS v.1-Hydro successfully captured individual variation in leaf and stem water potential due to increasing tree size and light environment, with model representation of hydraulic architecture and plant traits exerting primary and secondary controls, respectively, on the fidelity of model

  15. Linking hydraulic traits to tropical forest function in a size-structured and trait-driven model (TFS v.1-Hydro)

    Science.gov (United States)

    Christoffersen, Bradley O.; Gloor, Manuel; Fauset, Sophie; Fyllas, Nikolaos M.; Galbraith, David R.; Baker, Timothy R.; Kruijt, Bart; Rowland, Lucy; Fisher, Rosie A.; Binks, Oliver J.; Sevanto, Sanna; Xu, Chonggang; Jansen, Steven; Choat, Brendan; Mencuccini, Maurizio; McDowell, Nate G.; Meir, Patrick

    2016-11-01

    Forest ecosystem models based on heuristic water stress functions poorly predict tropical forest response to drought partly because they do not capture the diversity of hydraulic traits (including variation in tree size) observed in tropical forests. We developed a continuous porous media approach to modeling plant hydraulics in which all parameters of the constitutive equations are biologically interpretable and measurable plant hydraulic traits (e.g., turgor loss point πtlp, bulk elastic modulus ɛ, hydraulic capacitance Cft, xylem hydraulic conductivity ks,max, water potential at 50 % loss of conductivity for both xylem (P50,x) and stomata (P50,gs), and the leaf : sapwood area ratio Al : As). We embedded this plant hydraulics model within a trait forest simulator (TFS) that models light environments of individual trees and their upper boundary conditions (transpiration), as well as providing a means for parameterizing variation in hydraulic traits among individuals. We synthesized literature and existing databases to parameterize all hydraulic traits as a function of stem and leaf traits, including wood density (WD), leaf mass per area (LMA), and photosynthetic capacity (Amax), and evaluated the coupled model (called TFS v.1-Hydro) predictions, against observed diurnal and seasonal variability in stem and leaf water potential as well as stand-scaled sap flux. Our hydraulic trait synthesis revealed coordination among leaf and xylem hydraulic traits and statistically significant relationships of most hydraulic traits with more easily measured plant traits. Using the most informative empirical trait-trait relationships derived from this synthesis, TFS v.1-Hydro successfully captured individual variation in leaf and stem water potential due to increasing tree size and light environment, with model representation of hydraulic architecture and plant traits exerting primary and secondary controls, respectively, on the fidelity of model predictions. The plant

  16. [Ontario Hydro]. 1995 corporate budget and 1995--1997 business plan

    International Nuclear Information System (INIS)

    1995-01-01

    Ontario Hydro's corporate mission is to make Ontario Hydro a leader in energy efficiency and sustainable development, and to provide its customers with safe and reliable energy services at competitive prices. This document summarizes the corporation's work and financial results planned for the previous year and forecast for the two following years. It represents a consolidation of business plans prepared by the various business units

  17. [Ontario Hydro]. 1994 corporate budget and 1994--1996 business plan

    International Nuclear Information System (INIS)

    1994-01-01

    Ontario Hydro's Corporate mission is to make Ontario Hydro a leader in energy efficiency and sustainable development, and to provide its customers with safe and reliable energy services at competitive prices. This document summarizes the Corporation's work and financial results planned for the previous year and forecast for the two following years. It represents a consolidation of business plans prepared by the various Business Units

  18. Using ecosystem services to represent the environment in hydro-economic models

    Science.gov (United States)

    Momblanch, Andrea; Connor, Jeffery D.; Crossman, Neville D.; Paredes-Arquiola, Javier; Andreu, Joaquín

    2016-07-01

    Demand for water is expected to grow in line with global human population growth, but opportunities to augment supply are limited in many places due to resource limits and expected impacts of climate change. Hydro-economic models are often used to evaluate water resources management options, commonly with a goal of understanding how to maximise water use value and reduce conflicts among competing uses. The environment is now an important factor in decision making, which has resulted in its inclusion in hydro-economic models. We reviewed 95 studies applying hydro-economic models, and documented how the environment is represented in them and the methods they use to value environmental costs and benefits. We also sought out key gaps and inconsistencies in the treatment of the environment in hydro-economic models. We found that representation of environmental values of water is patchy in most applications, and there should be systematic consideration of the scope of environmental values to include and how they should be valued. We argue that the ecosystem services framework offers a systematic approach to identify the full range of environmental costs and benefits. The main challenges to more holistic representation of the environment in hydro-economic models are the current limits to understanding of ecological functions which relate physical, ecological and economic values and critical environmental thresholds; and the treatment of uncertainty.

  19. Hydro models and salmon recovery in the northwest

    International Nuclear Information System (INIS)

    Dragoon, K.

    1993-01-01

    Hydro regulation models provide extensive support for analyzing the efficacy of salmon recovery plans in the Northwest. Power planners developed these computer programs to help plan and efficiently operate a large multiple use river system. The models represent physical relationships and operational requirements on the system. They also simulate coordinated system operations for efficient power generation. These models are being pressed into service to provide data for fish recovery plans. They provide important information about hydro system capabilities and responses to recovery programs. However, the models cannot meet all of the analytical needs of fish biologists working toward salmon recovery

  20. Optimizing Hydro Power Turbines in Order to Secure the Passage of Fishes in Khuzestan province

    Directory of Open Access Journals (Sweden)

    Moona Mohammadi

    2015-04-01

    Full Text Available Nowadays,it is important to consider environmental issues,as ecological problems and their severe effect intensify in Iran,particularly in Khuzestan province.The environmental effects of hydroelectric plants are highly regarded due to their significant impact on an extensive area.The lack of safe path for fish passing through the turbines is one of these damages. In order to deal with these challenges,researchers are trying to optimize hydro power turbines.In this optimization,old runners were replaced,while conditions of fish passing through the turbines and fish survival have been improved.Considering the existence of six hydroelectric power plants in Khuzestan province,it would be possible to conduct optimization or constructing studies with a fish-friendly approach for the safe passage of fishes to slightly reduce the extent of environmental damages.

  1. Extraordinary repair in Madunice Hydro Power Plant

    International Nuclear Information System (INIS)

    Vrablik, R.; Zacik, P.

    2007-01-01

    A New Year did not begin very well for Madunice hydroelectric power plant. On 3 January, 2007 during operation, the TG 1 turbine set suffered sudden large impacts and inadmissible vibration of the machine while in the secondary regulation regime. The attending personnel had to shut down the turbine and discover the cause of the failure. The reinstatement of the TG 1 turbine was realised during 15 days in continual regime because TG 1 turbine is back-up power supply for the Bohunice NPP. (author)

  2. Study of community leaders in a nuclear host community: local issues, expectations and support and opposition

    International Nuclear Information System (INIS)

    Bronfman, B.H.

    1977-08-01

    A study of community leaders was undertaken in Hartsville, Tennessee, site of the TVA Hartsville Nuclear Power Plant currently under construction. Leaders were found to be extremely supportive of the plant and of TVA's efforts to mitigate impacts expected to result from construction. Like their citizen counterparts, leaders expect economic benefits and some growth-related disruption to occur as a result of the plant, while environmental impacts are seen as extremely unlikely to occur. Plant-related issues, such as housing availability and traffic congestion, dominate leaders' thinking about current issues. These issues are expected to continue to be important in the future, and new issues dealing with growth and planning, employment and taxation are expected to arise

  3. Mobile units to hydro geochemistry characterization

    International Nuclear Information System (INIS)

    Gomez, P.; Martinez, B.; Turrero, M.J.

    1994-01-01

    This report shows the mobile units for hydro geochemical studies. The authors analyze the work of mobile unit and the cars that conform the unit: Sampling car and analysis car: The sampling and equipment are took into account as well

  4. Energy sources and power plants

    International Nuclear Information System (INIS)

    Schulz, Detlef; Schulz, Karen

    2013-01-01

    Energy is obtained from various energy sources (coal, petroleum, natural gas, nuclear fuels, wind energy, solar energy, hydro power, biomass, geothermal energy). These differ in each case with respect to their availability, methods of their production and the required power plant technologies. As technologies of the future fuel cells and nuclear fusion are traded. [de

  5. Ontario Hydro statistical yearbook 1990

    International Nuclear Information System (INIS)

    1990-01-01

    Ontario Hydro was created in 1906 by a special statute of the Province of Ontario. It is a financially self-sustaining corporation without share capital. The yearbook is a compilation of financial data detailed by financial statements and sales and revenue figures for the year 1990. It is broken down by municipalities served in Ontario

  6. Ontario Hydro statistical yearbook 1990

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-12-31

    Ontario Hydro was created in 1906 by a special statute of the Province of Ontario. It is a financially self-sustaining corporation without share capital. The yearbook is a compilation of financial data detailed by financial statements and sales and revenue figures for the year 1990. It is broken down by municipalities served in Ontario.

  7. Ontario Hydro at the millennium : has monopoly's moment passed?

    International Nuclear Information System (INIS)

    Daniels, R.J.

    1996-01-01

    This volume is a collection of 10 papers presented at a conference in which the challenges of restructuring the electric power industry in Ontario were discussed. Legal experts, policy makers, economists and stakeholders in the industry presented their views regarding the future of the industry in Ontario. The implications of privatization were discussed. There was general agreement on the need for some industry de-integration and privatization. However, agreement on the exact nature of the approach to take was more divided. For example, opinion was divided on what the logical endpoint of industry restructuring should be i.e. wholesale or retail competition. Also contentious was the question of what portion of Hydro's generating assets should be sold off to private enterprise if Hydro's generation and transmission assets are unbundled. Opinions were also divided about the environmental consequences of nuclear energy. Significant differences of opinion were evident concerning the privatization of Ontario Hydro's nuclear assets. refs., tabs., figs

  8. The take-over of Gaz Metropolitain by Hydro-Quebec

    International Nuclear Information System (INIS)

    Bernard, J-T.

    1997-01-01

    The implications of a take-over of Gaz Metropolitain by Hydro-Quebec in early 1997 and the pricing of electricity and natural gas in Quebec were discussed. In January 1997, Hydro-Quebec purchased all the shares in Noverco that were formerly owned by SOQUIP. With this purchase, Hydro-Quebec became the major share holder in Noverco, the company that controls Gaz Metropolitain. This type of take-over, where an electrical utility purchases the interests in a natural gas distributor, has also been observed in the United States and is believed to be a consequence of the recent deregulation of the electricity market. In the near future, it is believed that consumers will probably pay for equivalent energy use (like heating or cooling) rather than separate tariffs for electricity or natural gas consumption. The recent popularity of gas-fueled electrical cogenerating stations is also believed to be an important factor in this take-over. 1 ref., 3 tabs

  9. The 12th 735-kV transmission line project: Hydro-Quebec network

    International Nuclear Information System (INIS)

    1992-01-01

    Hydro-Quebec is proposing to construct a 735-kV transmission line from the Chissibi station near the LG3 hydroelectric power plant to the Jacques-Cartier station near Quebec City. The width of the right-of-way will generally be 90 m and it is intended to install the line in two stages. The Chissibi-Chibougamau section should enter service in 1993 and the Chibougamau-Cartier section in 1994. The cost of the line is estimated at $1.21 billion, of which $900 million is for line construction and $310 million for station equipment. Prospective corridors for the line route have been selected, portions of which enable twinning with Hydro-Quebec's existing 9th 735-kV line. A series of hearings on the environmental and other impacts of the power line project was held by the Bureau d'audiences publiques sur l'environnement and results are summarized along with the views of the Bureau. The summary describes the justification for the project, the choice of the transmission line route, the evaluation of the impacts of the project on the natural and human environments, health effects due to magnetic fields, and effects on the economic development of northern Quebec. Recommendations are given for mitigating the impacts of the project. 13 refs., 8 figs., 2 tabs

  10. Hydro-climatic conditions and thermoelectric electricity generation – Part I: Development of models

    International Nuclear Information System (INIS)

    Koch, Hagen; Vögele, Stefan

    2013-01-01

    In recent years there have been several heat waves affecting the use of thermoelectric power plants, e.g. in Europe and the U.S. In this paper the linkage between hydro-climatic conditions and possible electricity generation restrictions is described. The coupling of hydrological models and a power plant model is presented. In this approach each power plant is considered separately with its technical specifications. Also environmental regulations, e.g. permissible rise in the cooling water temperature, are considered for the respective power plant. The hydrological models developed to simulate river runoff and water temperature are also site specific. The approach presented is applied to Krümmel nuclear power plant in Germany. Analysed are the uncertainties with regard to electricity generation restrictions on account of climatic developments and corresponding higher water temperatures and low flows. Overall, increased water temperatures and declining river runoff lead to more frequent and more severe generation restrictions. It is concluded that the site-specific approach is necessary to reliably simulate power plants water demand, river runoff and water temperature. Using a simulation time step of one day, electricity generation restrictions are significantly higher than for simulations at monthly time step. - Highlights: • An approach to assess climate effects on electricity generation is presented. • Site specific models for power plants, water temperature and discharge are used. • Monthly and daily simulation time-steps give different results. • Climate change effects on generation depend on cooling system and climate scenario

  11. Theoretical and conditional monitoring of a small three-bladed vertical-axis micro-hydro turbine

    International Nuclear Information System (INIS)

    Huang, Sy-Ruen; Ma, Yen-Huai; Chen, Chia-Fu; Seki, Kazuichi; Aso, Toshiyuki

    2014-01-01

    Highlights: • This paper presents a novel 3 three-bladed vertical-axis micro-hydro turbine system. • This paper presents structure and performance of micro-hydroelectric turbine system. • The paper reveal that using VAMHT system in water is distinct from using in wind. • This paper present an experimental results of VAMHT system. • The paper show that the status transformation from cut-into stable power generation is short. - Abstract: This paper presents a novel 3-kW three-bladed vertical-axis micro-hydro turbine (VAMHT) system. The experimental results reveal that using this type of turbine in water is distinct from using it in wind. The micro-hydro turbine system uses a three-phase permanent magnet symmetric generator that transforms mechanical energy into electrical energy. The output voltage and frequency of the generator depend on water flow speed, and voltage steady equipment is used to maintain the maximum output power of the DC bus. According to the maximum power point tracking of the micro-hydro turbine system, the condition monitoring of the novel micro-hydro turbine requires no water flow meter. Furthermore, the construction and installation of the new micro-hydro turbine is simple, economical, and stable. This system combines a micro-hydro generator and electrical state-monitoring system, which can measure the speed, output power, DC-bus voltage, and all electrical characteristics of the micro-hydro turbine system. The results of comparing turbine between wind and water show that the speed ranges of water flow is narrower than that of wind, and the status transformation from cut-into stable power generation is short

  12. 77 FR 26796 - HydroGenetics, Inc.; Order of Suspension of Trading

    Science.gov (United States)

    2012-05-07

    ... Trading May 2, 2012. It appears to the Securities and Exchange Commission that there is a lack of current... require a suspension of trading in the securities of HydroGenetics. Therefore, it is ordered, pursuant to Section 12(k) of the Securities Exchange Act of 1934, that trading in the securities of HydroGenetics is...

  13. Enzyme inhibitory and radical scavenging effects of some antidiabetic plants of Turkey

    Science.gov (United States)

    Orhan, Nilüfer; Hoçbaç, Sanem; Orhan, Didem Deliorman; Asian, Mustafa; Ergun, Fatma

    2014-01-01

    Objective(s): Ethnopharmacological field surveys demonstrated that many plants, such as Gentiana olivieri, Helichrysum graveolens, Helichrysum plicatum ssp. plicatum, Juniperus oxycedrus ssp. oxycedrus, Juniperus communis var. saxatilis, Viscum album (ssp. album, ssp. austriacum), are used as traditional medicine for diabetes in different regions of Anatolia. The present study was designed to evaluate the in vitro antidiabetic effects of some selected plants, tested in animal models recently. Materials and Methods: α-glucosidase and α-amylase enzyme inhibitory effects of the plant extracts were investigated and Acarbose was used as a reference drug. Additionally, radical scavenging capacities were determined using 2,2’-azino-bis(3-ethylbenzothiazoline-6-sulphonic acid) ABTS radical cation scavenging assay and total phenolic content of the extracts were evaluated using Folin Ciocalteu method. Results: H. graveolens ethanol extract exhibited the highest inhibitory activity (55.7 % ± 2.2) on α-amylase enzyme. Additionally, J. oxycedrus hydro-alcoholic leaf extract had potent α-amylase inhibitory effect, while the hydro-alcoholic extract of J. communis fruit showed the highest α-glucosidase inhibitory activity (IC50: 4.4 μg/ml). Conclusion: Results indicated that, antidiabetic effect of hydro-alcoholic extracts of H. graveolens capitulums, J. communis fruit and J. oxycedrus leaf might arise from inhibition of digestive enzymes. PMID:25140204

  14. Enzyme inhibitory and radical scavenging effects of some antidiabetic plants of Turkey

    Directory of Open Access Journals (Sweden)

    Nilüfer Orhan

    2014-06-01

    Full Text Available Objective(s:Ethnopharmacological field surveys demonstrated that many plants, such as Gentiana olivieri, Helichrysum graveolens, Helichrysum plicatum ssp. plicatum, Juniperus oxycedrus ssp. oxycedrus, Juniperus  communis var. saxatilis, Viscum album (ssp. album, ssp. austriacum, are used as traditional medicine for diabetes in different regions of Anatolia. The present study was designed to evaluate the in vitro antidiabetic effects of some selected plants, tested in animal models recently. Materials and Methods: α-glucosidase and α-amylase enzyme inhibitory effects of the plant extracts were investigated and Acarbose was used as a reference drug. Additionally, radical scavenging capacities were determined using 2,2'-azino-bis(3-ethylbenzothiazoline-6-sulphonic acid ABTS radical cation scavenging assay and total phenolic content of the extracts were evaluated using Folin Ciocalteu method. Results: H. graveolens ethanol extract exhibited the highest inhibitory activity (55.7 % ± 2.2 on α-amylase enzyme. Additionally, J. oxycedrus hydro-alcoholic leaf extract had potent α-amylase inhibitory effect, while the hydro-alcoholic extract of J. communis fruit showed the highest α-glucosidase inhibitory activity (IC50: 4.4 μg/ml. Conclusion:Results indicated that, antidiabetic effect of hydro-alcoholic extracts of H. graveolens capitulums, J. communis fruit and J. oxycedrus leaf might arise from inhibition of digestive enzymes.

  15. Issue of ecological impacts due to hydro-peaking management. Characterization of hydro-peaks - Operating experience on Maronne River; Impacts ecologiques des eclusees hydroelectriques. Caracterisaton des regimes d'eclusees et Retour d'experience sur la Maronne

    Energy Technology Data Exchange (ETDEWEB)

    Courret, Dominique; Larinier, Michel [Office National de l' Eau et des Milieux Aquatiques - ONEMA, Pole Ecohydraulique, IMFT, Cemagref, Avenue du Professeur Camille Soula, 31400 Toulouse (France); Chanseau, Matthieu [MIGADO, 18ter rue de la Garonne - 47520 Le Passage (France); Office National de l' Eau et des Milieux Aquatiques - ONEMA, Direction Interregionale de Toulouse, Avenue du Professeur Camille Soula, 31400 Toulouse (France); Lascaux, Jean-Marc [Etudes et COnseils en Gestion de l' Environnement Aquatique - ECOGEA, 10 avenue de Toulouse, 31860 Pins-Justaret (France)

    2012-01-15

    Hydro-peaking management can consistently alter fish populations, and particularly recruitment of diadromous species, like salmon. To progress in understanding the impacts and defining mitigation measures, it appears essential to combine long-term biological survey, hydrological analysis including hydro-peaks characterization, and hydro-morphologic approach. In a first time, a methodology for hydrological characterization of hydro-peaks is presented. Their diversity and high variability are illustrated. Then, we present operating experience on Maronne River, a tributary of the Dordogne River downstream Argentat affected by hydro-peaks of Hautefage scheme. Biological surveys and hydrologic and hydro-morphologic studies allowed a better understanding and a quantification of some biological impacts (redds dewatering, stranding-trapping of alevins), to support mitigation measures and to assess its effectiveness. The relevance of work on morphology, in addition to measures on flow management, is also illustrated. Some positive results have already been obtained. Studies on the Maronne River are pursued to achieve a really satisfactory situation. This example shows that the current knowledge does not allow, on a given stream, to pre-define mitigation measures and ensure their efficiency. This leads to advocate the setting up of similar approach on other river, to identify biological communities' responses depending on the characteristics of hydro-peaks and hydro-systems. (authors)

  16. Genotoxicity and antigenotoxicity study of aqueous and hydro-methanol extracts of Spondias mombin L., Nymphaea lotus L. and Luffa cylindrical L. using animal bioassays.

    Science.gov (United States)

    Oyeyemi, Ifeoluwa Temitayo; Yekeen, Olaide Maruf; Odusina, Paul Olayinka; Ologun, Taiwo Mary; Ogbaide, Orezimena Michelle; Olaleye, Olayinka Israel; Bakare, Adekunle A

    2015-12-01

    Spondias mombin (Linn), Nymphaea lotus (Linn) and Luffa cylindrica (Linn) (syn Luffa aegyptiaca Mill) are plants traditionally used as food ingredients and in the management of diseases, including cancer, in Nigeria. Despite the therapeutic potentials attributed to these plants, reports on their genotoxicity are scanty. In this study, the genotoxicity of the aqueous and hydro-methanol extract of these plants was evaluated using mouse bone marrow micronucleus and sperm morphology assays. Antigenotoxicity was assessed by the bone marrow micronucleus test. The highest attainable dose of 5 000 mg/kg according to OECD guidelines was first used to assess acute toxicity of the aqueous and hydro-methanol extracts in Swiss albino mice. For each extract, there were five groups of mice (n=4/group) treated with different concentrations of the extract as against the negative and positive control group for the genotoxicity study. In the antigenotoxicity study, five groups of mice were exposed to five different concentrations of the extracts along with 60 mg/kg of methyl methane sulfonate (MMS), which was used to induce genotoxicity. The mice were administered 0.2 mL of extract per day for 10 days in the genotoxicity and antigenotoxicity groups. Administration of each of the extracts at the concentration of 5 000 mg/kg did not induce acute toxicity in mice. At the concentrations tested, all the extracts, except aqueous S. mombin, increased micronucleated polychromatic erythrocytes. The aqueous and hydro-methanol extracts of N. lotus increased the frequency of aberrant sperm cells. All the extracts were also able to ameliorate MMS induced genotoxicity in bone marrow cells of the exposed mice. The results showed the potential of the extracts to induce somatic and germ cell mutation in male mice. The extracts also ameliorated the genotoxic effect of MMS.

  17. Genotoxicity and antigenotoxicity study of aqueous and hydro-methanol extracts of Spondias mombin L., Nymphaea lotus L. and Luffa cylindrical L. using animal bioassays

    Directory of Open Access Journals (Sweden)

    Oyeyemi Ifeoluwa Temitayo

    2015-12-01

    Full Text Available Spondias mombin (Linn, Nymphaea lotus (Linn and Luffa cylindrica (Linn (syn Luffa aegyptiaca Mill are plants traditionally used as food ingredients and in the management of diseases, including cancer, in Nigeria. Despite the therapeutic potentials attributed to these plants, reports on their genotoxicity are scanty. In this study, the genotoxicity of the aqueous and hydro-methanol extract of these plants was evaluated using mouse bone marrow micronucleus and sperm morphology assays. Antigenotoxicity was assessed by the bone marrow micronucleus test. The highest attainable dose of 5 000 mg/kg according to OECD guidelines was first used to assess acute toxicity of the aqueous and hydro-methanol extracts in Swiss albino mice. For each extract, there were five groups of mice (n=4/group treated with different concentrations of the extract as against the negative and positive control group for the genotoxicity study. In the antigenotoxicity study, five groups of mice were exposed to five different concentrations of the extracts along with 60 mg/kg of methyl methane sulfonate (MMS, which was used to induce genotoxicity. The mice were administered 0.2 mL of extract per day for 10 days in the genotoxicity and antigenotoxicity groups. Administration of each of the extracts at the concentration of 5 000 mg/kg did not induce acute toxicity in mice. At the concentrations tested, all the extracts, except aqueous S. mombin, increased micronucleated polychromatic erythrocytes. The aqueous and hydro-methanol extracts of N. lotus increased the frequency of aberrant sperm cells. All the extracts were also able to ameliorate MMS induced genotoxicity in bone marrow cells of the exposed mice. The results showed the potential of the extracts to induce somatic and germ cell mutation in male mice. The extracts also ameliorated the genotoxic effect of MMS.

  18. MEA [Municipal Electric Association] declares opposition to 1991 Ontario Hydro rate increase

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    In hearings before the Ontario Energy Board, the Municipal Electric Association (MEA) called for an average 1992 rate increase of 10.3%, lower than Ontario Hydro's revised figure of 10.4%, and a $129 million reduction in its operations, maintenance and administration budget. As it has been noted that Hydro pays considerably higher wages than the surrounding reference community, MEA recommended that the utility reduce and eventually eliminate the premium paid to employees, and also called for staff reductions and layoffs for 1991 and 1992. In the area of transmission reliability, MEA stated that Ontario Hydro's transmission maintenance is suffering at the expense of other priorities, and called for reorganizing its transmission plan to achieve target performance by 1996 rather than 1999. In 1991, only 65-70% of maintenance targets were being achieved. MEA also accused Hydro of deferring operational expenditures into deferment and capitalization, creating a false picture of the utility's financial condition. Also discussed at the hearing were the possible overestimating of the effects of Ontario Hydro's demand management programs, the possibility that a shift to time-of-use rates for industrial customers may increase demand, a downgrading of the province's and the utility's credit rating, and the unpleasant side effects of the non-utility generation program

  19. The future role of hydro-electricity in Sub-Saharan Africa

    International Nuclear Information System (INIS)

    Lazenby, J.B.C.

    1989-01-01

    Hydroelectric power currently supplies 56-93% of the electricity requirements of the different geographic areas of Sub-Saharan Africa and accounted for 73% of total requirements in 1980. The continent is richly endowed with hydro resources in all areas, with central Africa possessing the most abundant reserves. Existing installed hydro capacity is 13,500 MW and of the total technical resource of 290,000 MW, some 110,000 MW are estimated to constitute the potential that warrants investigation. The demand for electricity in the region is presently low and growing at 5-10%/y. It is projected to double from 47,000 GWh in 1980 to 110,000-170,000 GWh by the year 2000, and is likely to double again by 2020. Hydro reserves warranting investigation exceed the demand projected for the year 2000 by a ratio of over 3:1 and only 13 countries out of 36 have a ratio less than one. A large proportion of these reserves are estimated to be economic to develop relative to other means of power generation. The development of hydro resources should maintain the proportion of the demand met by hydro in the range of 60-75% well into the 21st century. The existing installed capacity is likely to be increased at the rate of 3,000-5,000 MW per decade to achieve this. Constraints on such increase include the large amounts of capital needed, environmental issues, the need to displace populations affected by flooding, and fluctuations in the oil price which make long-term planning uncertain. 5 refs., 1 fig., 11 tabs

  20. Coanda hydro intake screen testing and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Howarth, J.

    2001-07-01

    The objective of this project has been to evaluate the effectiveness, suitability and cost benefit of the Aquashear Coanda effect, maintenance free intake screen for use in small hydro system intakes. (author)

  1. Prospects for power plant technology

    International Nuclear Information System (INIS)

    Schilling, H.D.

    1993-01-01

    Careful conservation of resources in the enlarged context of the rational utilization of energy, the environment and capital will determine future power plant technology. The mainstays will be the further development of power plant concepts based on fossil (predominantly coal) and nuclear fuels; world-wide, also regenerative and CO 2 -free hydro-electric power will play a role. Rapid conversion of the available potential requires clear, long-term stable and reliable political framework conditions for the release of the necessary entrepreneurial forces. (orig.) [de

  2. Development of a native plant prescription for urban hydro rights of way

    Energy Technology Data Exchange (ETDEWEB)

    Suffling, R.; Lamb, L.; Murphy, S. [Waterloo Univ., Waterloo, ON (Canada)

    1998-12-31

    Ontario Hydro commissioned a study to determine how to control tall woody vegetation on rights-of-way since trees cause power leakage and make maintenance difficult. The objective was to find an environmentally benign solution to the problem. The study assessed the feasibility of using seven different herbaceous species of prairie affinity on rights-of-way in urban areas. Tallgrass prairie has long been known to inhibit invasion of woody species. A total of 64 plots were prepared and sown using four different methods. Effectiveness of the program was assessed by collating the abundance of the seven sown species for each of the four methods and by soil analysis to measure changes in the population of viable seeds in the soil. Results showed that the most effective strategy to establish the widest variety of species was to apply a fertilizer (glyphosate) in the Fall, and sowing a mix of species soon after, followed by rototilling in the spring and sowing a different mix. Seedbank observations proved useful in showing huge numbers of viable seeds surviving after long periods (40 years) without soil disturbance,. 3 refs., 1 tab., 2 figs.

  3. Development of a native plant prescription for urban hydro rights of way

    International Nuclear Information System (INIS)

    Suffling, R.; Lamb, L.; Murphy, S.

    1998-01-01

    Ontario Hydro commissioned a study to determine how to control tall woody vegetation on rights-of-way since trees cause power leakage and make maintenance difficult. The objective was to find an environmentally benign solution to the problem. The study assessed the feasibility of using seven different herbaceous species of prairie affinity on rights-of-way in urban areas. Tallgrass prairie has long been known to inhibit invasion of woody species. A total of 64 plots were prepared and sown using four different methods. Effectiveness of the program was assessed by collating the abundance of the seven sown species for each of the four methods and by soil analysis to measure changes in the population of viable seeds in the soil. Results showed that the most effective strategy to establish the widest variety of species was to apply a fertilizer (glyphosate) in the Fall, and sowing a mix of species soon after, followed by rototilling in the spring and sowing a different mix. Seedbank observations proved useful in showing huge numbers of viable seeds surviving after long periods (40 years) without soil disturbance,. 3 refs., 1 tab., 2 figs

  4. Effects of Scandinavian hydro power on storage needs in a fully renewable European power system for various transmission capacity scenarios

    Science.gov (United States)

    Kies, Alexander; Nag, Kabitri; von Bremen, Lueder; Lorenz, Elke; Heinemann, Detlev

    2015-04-01

    The penetration of renewable energies in the European power system has increased in the last decades (23.5% share of renewables in the gross electricity consumption of the EU-28 in 2012) and is expected to increase further up to very high shares close to 100%. Planning and organizing this European energy transition towards sustainable power sources will be one of the major challenges of the 21st century. It is very likely that in a fully renewable European power system wind and photovoltaics (pv) will contribute the largest shares to the generation mix followed by hydro power. However, feed-in from wind and pv is due to the weather dependant nature of their resources fluctuating and non-controllable. To match generation and consumption several solutions and their combinations were proposed like very high backup-capacities of conventional power generation (e.g. fossile or nuclear), storages or the extension of the transmission grid. Apart from those options hydro power can be used to counterbalance fluctuating wind and pv generation to some extent. In this work we investigate the effects of hydro power from Norway and Sweden on residual storage needs in Europe depending on the overlaying grid scenario. High temporally and spatially resolved weather data with a spatial resolution of 7 x 7 km and a temporal resolution of 1 hour was used to model the feed-in from wind and pv for 34 investigated European countries for the years 2003-2012. Inflow into hydro storages and generation by run-of-river power plants were computed from ERA-Interim reanalysis runoff data at a spatial resolution of 0.75° x 0.75° and a daily temporal resolution. Power flows in a simplified transmission grid connecting the 34 European countries were modelled minimizing dissipation using a DC-flow approximation. Previous work has shown that hydro power, namely in Norway and Sweden, can reduce storage needs in a renewable European power system by a large extent. A 15% share of hydro power in Europe

  5. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  6. 75 FR 65312 - Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2010-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13831-000] Vortex Hydro... Comments and Interventions October 15, 2010. On August 9, 2010, Vortex Hydro Energy, LLC filed an... 0.788 gigawatt-hours. Applicant Contact: Gus Simiao, CEO, Vortex Hydro Energy, LLC, 2512 Carpenter...

  7. 76 FR 76155 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-12-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... Diego Gas & Electric Company transmission line located to the south. Applicant Contact: Arnold B...

  8. Hydro-Quebec : annual report 1998 : for today and tomorrow

    International Nuclear Information System (INIS)

    1999-01-01

    Hydro-Quebec is a publicly owned company with a single shareholder, the Quebec government. In 1998, the utility had over 31,400 MW in installed capacity, ranking it among North America's largest distributors of electrical energy. This report provides a review of progress and financial highlights including revenue, expenditure, financial expenses, net income, total assets, long term debt, shareholder's equity and the overall financial position of the utility. In 1998 sales totaled 161.4 TWh, with Quebec markets accounting for more than 88 percent and sales, outside Quebec accounting for 11.5 per cent. Three factors related to weather impacted the utility in 1998. The first was mild weather which brought down domestic and agricultural power consumption by 3 TWh compared with the average recorded in the past half-century. The second was low precipitation which caused Hydro-Quebec to turn to means other than hydroelectric generation to supply power to Quebec customers. These included start-up generation of the Tracy thermal generating station, reduction of sales on short-term markets outside Quebec, and electricity purchases on external markets. The third factor was the ice storm of January 1998, which caused significant damage to part of Hydro-Quebec's transmission and distribution systems. Throughout the year, Hydro-Quebec worked in reinforcing its power lines to prevent repetition of the devastation that occurred during the ice storm. In spite of the events of January 1998, the Utility remains committed to the growth and profitability orientations laid out in its Strategic Plan for 1998-2002. Significant progress was made in consolidating the Utility's position in international markets. Productive partnerships have been established with the Quebec Federation of Labour Solidarity Fund, and with Gaz de France. A network of international partners in a score of countries also has been developed. Hydro-Quebec has completed most of its preparations for Year 2000 readiness

  9. Optimizing hourly hydro operations at the Salt Lake City Area integrated projects

    International Nuclear Information System (INIS)

    Veselka, T.D.; Hamilton, S.; McCoy, J.

    1995-01-01

    The Salt Lake City Area (SLCA) office of the Western Area Power Administration (Western) is responsible for marketing the capacity and energy generated by the Colorado Storage, Collbran, and Rio Grande hydropower projects. These federal resources are collectively called the Salt Lake City Area Integrated Projects (SLCA/IP). In recent years, stringent operational limitations have been placed on several of these hydropower plants including the Glen Canyon Dam, which accounts for approximately 80% of the SLCA/IP resources. Operational limitations on SLCA/IP hydropower plants continue to evolve as a result of decisions currently being made in the Glen Canyon Dam Environmental Impact Statement (EIS) and the Power Marketing EIS. To analyze a broad range of issues associated with many possible future operational restrictions, Argonne National Laboratory (ANL), with technical assistance from Western has developed the Hydro LP (Linear Program) Model. This model simulates hourly operations at SLCA/IP hydropower plants for weekly periods with the objective of maximizing Western's net revenues. The model considers hydropower operations for the purpose of serving SLCA firm loads, loads for special projects, Inland Power Pool (IPP) spinning reserve requirements, and Western's purchasing programs. The model estimates hourly SLCA/IP generation and spot market activities. For this paper, hourly SLCA/IP hydropower plant generation is simulated under three operational scenarios and three hydropower conditions. For each scenario an estimate of Western's net revenue is computed

  10. Lessons from plant management for achieving economic competitiveness for evolutionary reactors

    International Nuclear Information System (INIS)

    Andognini, G.

    1999-01-01

    Ontario Hydro, Canada's largest utility, has 20 nuclear power units of the CANDU design with a total design power of 15, 020 Electrical MW or about half of the total generating capacity. The performance of these plants, which were installed between the 1970s and early 1990s, was initially very good but worsened in recent years and the regulator expressed concerns about declining safety standards. In early 1997, an external Nuclear Performance Advisory Group led by Mr G. Carl Andognini was established and conducted an intensive assessment of the nuclear operation. That assessment ranked the operation of Ontario Hydro's plants as m inimally acceptable , noting a number of causes such as: lack of management leadership and accountability; poor safety culture; inadequate training; lack of configuration management; and, deficient organization. A recovery program is now underway, involving the laying-up of eight units to free resources to upgrade the remaining twelve. A number of lessons that can be drawn from the Ontario Hydro experience are presented. The key lessons include: the importance of having the light people, with the right qualifications in the right place, at the right time; the need for all staff to have a questioning attitude and to be committed to a s afety culture ; configuration management is essential - knowledge of the status of the plant must be maintained and all documentation kept up to date; maintenance must be given high priority and be provided adequate resources: defined standards are needed for the conduct of all work; the Directors (or equivalent) and senior management must understand the plant and appreciate the consequences of their decisions and actions. The paper concludes that good new designs are not sufficient by themselves to achieve economically competitive and safe nuclear plants - a high standard of operation and maintenance is also necessary throughout the life of the plants. (author)

  11. Complementarity of hydro and wind power: Improving the risk profile of energy inflows

    International Nuclear Information System (INIS)

    Denault, Michel; Dupuis, Debbie; Couture-Cardinal, Sebastien

    2009-01-01

    The complementarity of two renewable energy sources, namely hydro and wind, is investigated. We consider the diversification effect of wind power to reduce the risk of water inflow shortages, an important energy security concern for hydropower-based economic zones (e.g. Quebec and Norway). Our risk measure is based on the probability of a production deficit, in a manner akin to the value-at-risk, simulation analysis of financial portfolios. We examine whether the risk level of a mixed hydro-and-wind portfolio of generating assets improves on the risk of an all-hydro portfolio, by relaxing the dependence on water inflows and attenuating the impact of droughts. Copulas are used to model the dependence between the two sources of energy. The data considered, over the period 1958-2003, are for the province of Quebec, which possesses large hydro and wind resources. Our results indicate that for all scenarios considered, any proportion of wind up to 30% improves the production deficit risk profile of an all-hydro system. We can also estimate the value, in TW h, of any additional one percent of wind in the portfolio. (author)

  12. 77 FR 21765 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-04-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... California Edison located north of the proposed project and to an existing San Diego Gas & Electric Company...

  13. 76 FR 36533 - Bangor Hydro Electric Company; Notice of Request for Waiver

    Science.gov (United States)

    2011-06-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-5-000] Bangor Hydro Electric Company; Notice of Request for Waiver Take notice that on June 13, 2011, pursuant to section 358.1(d) of the Commission's regulations, 18 CFR 358.1(d) (2011), Bangor Hydro Electric Company (Bangor...

  14. Mini hydro power in Peninsular Malaysia - the past, present and future

    International Nuclear Information System (INIS)

    Bhaskar Kannan

    2006-01-01

    The early development of mini hydro development in Peninsular Malaysia was carried out by the National Electricity Board (NEB) and the projects developed in the 50s and 60s were Ulu Langat (Selangor), Sempam, Kg. Raja , Kuala Terla, and Robinson Falls (all in Pahang). In the 70s the main effort of hydropower development was concentrated on developing major hydropower projects not only to cater to the country increasing demand for electricity but also to the country needs for flood control. This development was feverishly carried out on the Perak River and the prohects built were Temenggor (384 MW), Bersia (72 MW), Kenering (20 MW), Sg Piah (70 MW) and the Kenyir (400 MW) project in Sungai Terengganu. In late 1970s, the government was keen to electrify the rural areas of Peninsular Malaysia and mini hydro power development was thought of as an option to provide electricity to these areas. The Mini Hydro Department of National Electricity Board (MHD) was then formed to undertake the task of planning, developing and implementing mini hydro projects to meet this government aspiration. Table 1 shows the list of projects identified and implemented and its status

  15. Summary of Ontario Hydro's 1990-91 zebra mussel research program

    International Nuclear Information System (INIS)

    Claudi, R.; Wiancko, P.M.

    1992-01-01

    Ontario Hydro is the principal supplier of electricity to the Province of Ontario. It serves 3.6 million customers, with an inservice capacity of 28,200 MW. Ontario Hydro has seven fossil, five nuclear, and four hydraulic stations in the Great Lakes Basin and surrounding watershed. In addition, there are another 60 inland hydraulic stations and numerous dams. As the largest single user of raw water from the Great Lakes Basin, Ontario Hydro recognized the need to control zebra mussels early in 1989. At that time, very little was known in North America about the zebra mussel life cycle and potential impact. European utilities were consulted, but as we now know, zebra mussels are not perceived to be a problem in Europe at this time. To satisfy the immediate need for control, chlorination was identified as the most effective interim measure to prevent the fouling of systems which draw water from the aquatic environment. Due to the current regulatory environment, this solution is considered short term and Ontario Hydro was compelled to initiate a comprehensive research effort aimed at providing alternative methods of control. Most of the research effort during 1990, was methods of control. Most of the research effort during 1990, was directed towards this goal. Many alternative control measures, both chemical and nonchemical were considered. Also considered were the potential effects of the control measures and zebra mussels on station operations. A multidisciplinary team involving aquatic biologists, chemists, corrosion specialists, and civil and mechanical engineers from the various departments of Ontario Hydro was asked to address the problem. Some of the research also involved collaborative studies with universities, US utilities, American Water Works Association, and Canadian industries. Following is a summary of the research effort in 1990, and a preview of the research underway in 1991

  16. Hydro-Quebec and energy efficiency

    International Nuclear Information System (INIS)

    1990-01-01

    There is growing awareness that energy efficiency is both profitable and environmentally beneficial. In this year's Development Plan, Hydro-Quebec is proposing an Energy Efficiency Project made up of marketing programs designed for all markets throughout the final decade of the 20th century. This Project will have two aspects: energy efficiency and consumption management. Hydro-Quebec aims to reach an energy-efficiency level of 12.9 terawatt hours per year by 1999, fully 55% of its 23-terawatt hour potential. Over the next 10 years the utility intends to spend $1.8 billion for this purpose. Cumulative anticipated energy savings should be in the vicinity of 70 terawatt hours for the coming decade, and more than 130 terawatt hours for the first decade of the next century. Of the overall goal of 12.9 terawatt hours for Horizon 1999, energy savings of 9.0 terawatt hours should be the direct result of this year's proposed marketing programs, and will account for the bulk of anticipated investments. The remaining 3.9 terawatt hours will be gained as customers acquire better electrical appliance and accessory (household appliances, home insulation) buying habits

  17. Hydro to market green power at special prices

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1996-01-01

    A 600 kW grid-connected demonstration wind turbine at Ontario Place will provide green power to Toronto residents early in 1997. The joint venture project partners include publicly owned Ontario Hydro, Toronto Hydro and Natural Resources Canada. The power will be sold at a premium under arrangements yet to be announced. The green power pricing initiative would allow some customers to buy their electricity at a green price. The project could be a self-financing model for future renewable energy development. The Ontario Place turbine project will determine whether Toronto electricity customers want green power or electricity from nuclear and fossil stations, and could determine which type of generation should be built in the future

  18. Integration of Variable Speed Pumped Hydro Storage in Automatic Generation Control Systems

    Science.gov (United States)

    Fulgêncio, N.; Moreira, C.; Silva, B.

    2017-04-01

    Pumped storage power (PSP) plants are expected to be an important player in modern electrical power systems when dealing with increasing shares of new renewable energies (NRE) such as solar or wind power. The massive penetration of NRE and consequent replacement of conventional synchronous units will significantly affect the controllability of the system. In order to evaluate the capability of variable speed PSP plants participation in the frequency restoration reserve (FRR) provision, taking into account the expected performance in terms of improved ramp response capability, a comparison with conventional hydro units is presented. In order to address this issue, a three area test network was considered, as well as the corresponding automatic generation control (AGC) systems, being responsible for re-dispatching the generation units to re-establish power interchange between areas as well as the system nominal frequency. The main issue under analysis in this paper is related to the benefits of the fast response of variable speed PSP with respect to its capability of providing fast power balancing in a control area.

  19. Upstream fish migration. Report of the hydro power panel of experts; Fischaufstieg. Bericht aus der Expertengruppe Wasserkraft

    Energy Technology Data Exchange (ETDEWEB)

    Roger, Sebastian [RWE Innogy GmbH, Essen (Germany). Asset Management Hydro National; Kaefer, Sabine [Verbund Hydro Power AG, Villach (Austria); Ulrich, Jochen [EDH Energiedienst Holding AG, Laufenburg (Switzerland). Oekologie und Werkdienst; Zemanek, Friedrich [evn naturkraft Erzeugungsgesellschaft m.b.H., Maria Enzersdorf (Austria)

    2013-10-01

    In recent years, ecological regulations and environmental demands have steadily increased on European, national, and on Federal State level. One key issue of Federal implementations of the European water framework directive is to achieve the environmental targets by establishing the passability for fish. In support of its member companies, VGB (TC 'Hydro Power Plants') set up a transnational expert group. This group was to analyse, compare, and evaluate different essential guidelines for fish passes and residual flows including the exchange of experience and the provision of practical examples. (orig.)

  20. Report on the renewal of the hydro-electric concessions

    International Nuclear Information System (INIS)

    2006-11-01

    The administrative procedures of the renewable of the hydro-electric concessions in France is a real problem, leading to too long time of the case files examination. This mission aimed to identify the technical and financial criteria on which the decision maker will base his choice to give the concessions renewal. This report exposes the evaluation and the recommendations of the mission. The first part establishes an evaluation of the situation of the hydro-electric concessions and the today renewal procedures. The second part presents a analysis of this situation and the recommendations. The last part brings the conclusions. (A.L.B.)