WorldWideScience

Sample records for tva hydro plants

  1. TVA's nuclear power plant experience

    International Nuclear Information System (INIS)

    Willis, W.F.

    1979-01-01

    This paper reviews TVA's nuclear power plant design and construction experience in terms of schedule and capital costs. The completed plant in commercial operation at Browns Ferry and six additional plants currently under construction represent the nation's largest single commitment to nuclear power and an ultimate investment of $12 billion by 1986. The presentation is made in three separate phases. Phase one will recapitulate the status of the nuclear power industry in 1966 and set forth the assumptions used for estimating capital costs and projecting project schedules for the first TVA units. Phase two describes what happened to the program in the hectic early 1979's in terms of expansion of scope (particularly for safety features), the dramatic increase in regulatory requirements, vendor problems, stretchout of project schedules, and unprecedented inflation. Phase three addresses the assumptions used today in estimating schedules and plant costs for the next ten-year period

  2. Evaluation of NOX emissions from TVA coal-fired power plants

    International Nuclear Information System (INIS)

    Jones, J.W.; Stamey-Hall, S.

    1991-01-01

    The paper gives results of a preliminary evaluation of nitrogen oxide (NOx) emissions from 11 Tennessee Valley Authority (TVA) coal-fired power plants. Current EPA AP-42 emission factors for NOx from coal-fired utility boilers do not account for variations either in these emissions as a function of generating unit load, or in designs of boilers of the same general type, particularly wall-fired boilers. The TVA has compiled short-term NOx emissions data from 30 units at 11 TVA coal-fired plants. These units include cyclone, cell burner, single wall, opposed wall, single tangential, and twin tangential boiler firing designs. Tests were conducted on 29 of the 30 units at high load; 18 were also tested at reduced load. NOx emissions rates were calculated for each test and compared to the calculated rate for each boiler type using AP-42. Preliminary analysis indicates that: (1) TVA cyclone-fired units emit more NOx than estimated using AP-42; (2) TVA cell burner units emit considerably more NOx than estimated; (3) most TVA single-wall-fired units emit slightly more NOx than estimated; (4) most TVA single-furnace tangentially fired units emit less NOx than estimated at high load, but the same as (or more than) estimated at reduced load; and (5) most TVA twin-furnace tangentially fired units, at high load, emit slightly more NOx than estimated using AP-42

  3. Analysis of plume rise data from five TVA steam plants

    International Nuclear Information System (INIS)

    Anfossi, D.

    1985-01-01

    A large data set containing the measurements of the rise of plumes emitted by five TVA steam plants was examined. Particular attention was paid to the problem of the merging of the plumes emitted by adjacent stacks and to the role played by the wind angle in this respect. It was demonstrated that there is a noticeable rise enhancement of merged plumes with respect to single emissions, both in neutral and in stable conditions, as far as transversal and parallel plumes are concerned. For plumes advected normal to the row of the stacks the enhancement is noticeable only in the final stage of rise. The existence of a critical angle for merging suggested enhancement is noticeable only in the final stage of rise. The existence of a critical angle for merging suggested by Briggs was examined. Finally, a formula to describe plume rise in the transitional and in the final phase, both in neutral and stable conditions, is proposed; it was obtained by interpolation of two familiar Brigg's equations

  4. Taylor Hydro plant goes live

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The 12.75 MW Taylor Hydroelectric Plant in Magrath, Alberta, synchronized its generator with the Alberta Power Grid and began production in April 2000. The plant is located on Government of Alberta irrigation works and is owned by Canadian Hydro Developers. During the irrigation season the plant will generate approximately 40 million kilowatt hours of zero-emission 'green' power for consumption, enough to power 5,000 homes for a year. The Taylor plant is a joint venture with EPCOR Power Development Corporation, a wholly-owned subsidiary of EPCOR Inc., the City of Edmonton utility. Canadian Hydro Developers also owns a 19 MW wind plant and a 6 MW gas plant in Alberta and five other 'run of river' hydro plants in Ontario and British Columbia. The company is committed to the concept of low-impact power generation; its ownership of wind run-of-river hydro and gas-fired facilities is proof of that commitment

  5. MHD repowering of a 250 MWe unit of the TVA Allen Steam Plant

    International Nuclear Information System (INIS)

    Chapman, J.N.; Attig, R.C.

    1992-01-01

    In this paper coal fired MHD repowering is considered for the TVA Allen Steam Plant. The performance of the repowered plant is presented. Cost comparisons are made of the cost of repowering with MHD versus the cost of meeting similar standards by installing scrubbers and selective catalytic NO x reduction (SCNR). For repowering of a single 250 MW e unit, the costs favor scrubbing and SCNR. If one considers a single repowering of all three 250 MW e units by a single MHD topping cycle and boiler, MHD repowering is more economical. Environmental emissions from the repowered plant are estimated

  6. TVA coal-gasification commercial demonstration plant project. Volume 5. Plant based on Koppers-Totzek gasifier. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    This volume presents a technical description of a coal gasification plant, based on Koppers-Totzek gasifiers, producing a medium Btu fuel gas product. Foster Wheeler carried out a conceptual design and cost estimate of a nominal 20,000 TPSD plant based on TVA design criteria and information supplied by Krupp-Koppers concerning the Koppers-Totzek coal gasification process. Technical description of the design is given in this volume.

  7. Control of occupational radiation exposures in TVA nuclear power plants - design and operating philosophy

    International Nuclear Information System (INIS)

    Belvin, E.A.; Lyon, M.; Beasley, E.G. Jr.; Zobel, W.; Stone, G.F.

    1976-01-01

    TVA has some 21,000 MWe of nuclear generation in various phases of design, construction, or operation. When Browns Ferry was designed in the late 1960's, there were no guidelines available regarding implant radiation control features, so TVA relied on good engineering and health physics judgement in developing its design and operating criteria for radiation protection. After two years of operation at Browns Ferry, the authors experience shows that their design criteria were in most cases adequate or more than adequate. However, several areas present continuing problems relative to radiation and contamination control. In view of the recent NRC ALARA guidelines, they have instituted a program to ensure that the ALARA concept is made an integral part of their design and operating plans. Administrative documents were issued giving management support to the ALARA concept. A 4-member management audit team consisting of representatives from their design, operating, and radiation protection groups was established to review the effectiveness of radiation protection design features and operating activities on a plant-by-plant basis. Reports and recommendations from these audits are sent to top-level management staff. Their goal is to maintain an audit-appraisal system consisting of in-plant awareness of radiation and contamination conditions, assessment of trends in occupational radiation exposures, and feedback to their designers regarding problems encountered during operation and maintenance activities

  8. Romanian achievement in hydro-power plants

    International Nuclear Information System (INIS)

    Cardu, M.; Bara, T.

    1998-01-01

    This paper briefly deals with the achievements relating to Hydro-electric Power Plants within the process of development of the National Power System in Romania. Also presented is the Romanian industry contribution to hydro-electrical power plant equipment manufacturing. (author)

  9. Optimal control systems in hydro power plants

    International Nuclear Information System (INIS)

    Babunski, Darko L.

    2012-01-01

    The aim of the research done in this work is focused on obtaining the optimal models of hydro turbine including auxiliary equipment, analysis of governors for hydro power plants and analysis and design of optimal control laws that can be easily applicable in real hydro power plants. The methodology of the research and realization of the set goals consist of the following steps: scope of the models of hydro turbine, and their modification using experimental data; verification of analyzed models and comparison of advantages and disadvantages of analyzed models, with proposal of turbine model for design of control low; analysis of proportional-integral-derivative control with fixed parameters and gain scheduling and nonlinear control; analysis of dynamic characteristics of turbine model including control and comparison of parameters of simulated system with experimental data; design of optimal control of hydro power plant considering proposed cost function and verification of optimal control law with load rejection measured data. The hydro power plant models, including model of power grid are simulated in case of island ing and restoration after breakup and load rejection with consideration of real loading and unloading of hydro power plant. Finally, simulations provide optimal values of control parameters, stability boundaries and results easily applicable to real hydro power plants. (author)

  10. Physical model of a floating trash boom to control aquatic weeds at the TVA Widows Creek Fossil Plant

    International Nuclear Information System (INIS)

    Hopping, P.N.

    1991-01-01

    This paper reports that the Tennessee Valley Authority (TVA) Widows Creek Fossil plant seasonally encounters adverse accumulations of aquatic weeds at the intakes of the condenser cooling water pumps. To reduce the accumulations, a floating trash boom has been proposed for the intakes. To evaluate the hydraulic feasibility of a boom, a physical model of the intakes has been built at the TVA Engineering Laboratory. The model was used to determine the boom alignment and depth of skimming needed to successfully deflect weeds away from the intakes and provide self-cleaning

  11. Unmanned operation of Hydro Power Plants

    International Nuclear Information System (INIS)

    Regula, E.

    2008-01-01

    Intentions to launch unmanned operation are no news, the very first occurred in Hydro Power Plants (HPP) at the time when the first computer technology was implemented into process of power generation, i.e. no later than in 1960 s . ENEL entering Slovenske elektrarne not only revived but significantly accelerated the implementation process of unmanned operation. Experience of ENEL says that unmanned operation means better reliability of the HPP and this is the priority. (author)

  12. The dual hydro x nuclear power plants

    International Nuclear Information System (INIS)

    Borges, J.C.

    1984-01-01

    An our daily life in modern society becomes more and more dependent on electricity, supply of this kind of energy should not only be a part of a global energy policy, but also lay down rigorous criteria to garanty the market supply. Planning actions of the electrical sector are more sensitive to unforseen events, either to brief interruptions in energy supply or to non-equilibrium at any time of the excess of supply over demand. In this way, the cost factor although basic, does not lead to optimal solutions in decisions which involve options between different technologies and energy sources to generate electricity. In this paper, we analyse the above situation in the case of deciding between utilization of nuclear or hydro power plants to supply the Brazilian demande for electricity. Our final objective was the search for parameters which could lead us to better identify and understand the adroitness and mistakes of the Brazilian Nuclear Program. (Author) [pt

  13. Pumped Storage Hydro Power Plant Cierny Vah

    International Nuclear Information System (INIS)

    Regula, E.

    1998-01-01

    In this leaflet the pump-storage power plant Cierny Vah is presented. A Cierny Vah pumped storage power plant (PSP) has been designed and built for providing the reliable and quality electric energy supply and for covering load changes of an electrification system. (ES). It is mainly the pumped storage hydro power plants plants which in our conditions are the sources operatively covering the sudden changes of the ES load from the ecological, economic but mainly from the operational point of view. The electric energy generation volume is not the primary standpoint but especially their control functions in the ES. During the building of the Cierny Vah PSP the peak operation with the daily accumulation, participation in frequency control and output in ES and the compensation function in ES were to be its main tasks. After putting it into operation by especially after its becoming independent of the Slovak ES in 1994 the static functions (energy generation from pumping, balance output reserves, daily control, ...) gave way to dynamic functions which gained greater importance. After interconnection of the ES with the UCPTE West European Association in which there are besides other things, the strict criteria for observing balance outputs, the main functions of PSPs are as follows: (1) Dynamic services for ES; (2) Dispatching reserve for the fall out of the greatest ES block; (3) Observing the foreign cooperation balance agreed; (4) Compensation of peaks and also of sudden daily load diagram reductions. Technical parameters of the upper and lower reservoir are described. The hydro power plant is a body lower reservoir. In it there are six vertical pumping aggregates in the three machine layout: the motor-generator - the turbine - the pump. Between the turbine and the pump there is a hydraulically controlled claw clutch engaging at rest and disengaging also during the aggregate operation. During pumping air is involved inside the turbine. The Francis turbines have a

  14. Environmental radioactivity levels, Browns Ferry Nuclear Plant. Annual report, 1985 (TVA/NUC SVS/RH)

    International Nuclear Information System (INIS)

    1986-04-01

    The preoperational environmental radiological monitoring program established a baseline of data on the distribution of natural and manmade radioactivity in the environment near the plant site. However, seasonal, yearly, and random variations in the data were observed. In order to determine the potential increases in environmental radioactivity levels caused by the plant, comparisons were made between data for indicator stations (those near the plant) and control stations (those remote from the plant) in conjunction with comparisons with preoperational data

  15. First decade: TVA's first ten years of nuclear power plant design and construction experience

    International Nuclear Information System (INIS)

    Willis, W.F.

    1978-01-01

    This paper reviews the experience of the Tennessee Valley Authority's design and construction program for nuclear power plants in terms of schedule and capital costs in three separate phases. Phase one recapitulates the status of the nuclear power industry in 1966 and sets forth the assumptions used for estimating capital costs and projecting schedules for the first Tennessee Valley Authority units. Phase two describes what happened to the program in the hectic early 1970s in terms of expansion of scope (particularly for safety features), the dramatic increase in regulatory requirements, vendor problems, stretchout of project schedules, and unprecented inflation. Phase three addresses the assumptions used today in estimating schedules and plant costs for the next 10-year period. 7 figures, 7 tables

  16. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  17. Decision making algorithms for hydro-power plant location

    CERN Document Server

    Majumder, Mrinmoy

    2013-01-01

    The present study has attempted to apply the advantage of neuro-genetic algorithms for optimal decision making in maximum utilization of natural resources. Hydro-power is one of the inexpensive, but a reliable source of alternative energy which is foreseen as the possible answer to the present crisis in the energy sector. However, the major problem related to hydro-energy is its dependency on location. An ideal location can produce maximum energy with minimum loss. Besides, such power-plant also requires substantial amount of land which is a precious resource nowadays due to the rapid and unco

  18. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  19. TVA and its rivals

    International Nuclear Information System (INIS)

    Feine, P.

    1997-01-01

    The long running opposition of a group of investor-owned electric utilities to the success of the federally-owned and subsidised Tennessee Valley Authority (TVA) is described. The TVA provides plentiful, affordable electric power to the many economically deprived residents of the southeastern United States, but there have been continued calls, most vocally by those electric utilities who would benefit financially from its demise, for reform of the power production giant, including withdrawal of its federal subsidies. In the manner of much US political manoevering claims and counter-claims are being pursued through the courts and via television advertising in an effort to sway public opinion against the publicly accountable TVA and towards privately owned utilities in the name of ''fair'' competition. (UK)

  20. Whistleblowers ask Congress to investigate TVA's nuclear power program

    International Nuclear Information System (INIS)

    Lane, E.

    1993-01-01

    Congress should investigate the Tennessee Valley Authority's nuclear power plant construction and operations programs as soon as possible, a coalition of Tennessee environmentalists and whistleblowers told reporters at a press conference in Washington, DC. The Foundation for Global Sustainability and four employees of TVA nuclear plants called for congressional action because they contend the Nuclear Regulatory Commission and the Department of Labor have failed to act to protect whistleblowers who report nuclear safety problems. The foundation contends the economics of nuclear plant construction by TVA do not make sense and in the rush to finish the Watts Bar nuclear plant, which has been under construction for 20 years, TVA has ignored safety issues

  1. Hydrogen production at hydro-power plants

    Science.gov (United States)

    Tarnay, D. S.

    A tentative design for hydrogen-producing installations at hydropower facilities is discussed from technological, economic and applications viewpoints. The plants would use alternating current to electrolyze purified river water. The hydrogen would be stored in gas or liquid form and oxygen would be sold or vented to the atmosphere. The hydrogen could later be burned in a turbine generator for meeting peak loads, either in closed or open cycle systems. The concept would allow large hydroelectric plants to function in both base- and peak-load modes, thus increasing the hydraulic utilization of the plant and the capacity factor to a projected 0.90. Electrolyzer efficiencies ranging from 0.85-0.90 have been demonstrated. Excess hydrogen can be sold for other purposes or, eventually, as domestic and industrial fuel, at prices competitive with current industrial hydrogen.

  2. Extraordinary repair in Madunice Hydro Power Plant

    International Nuclear Information System (INIS)

    Vrablik, R.; Zacik, P.

    2007-01-01

    A New Year did not begin very well for Madunice hydroelectric power plant. On 3 January, 2007 during operation, the TG 1 turbine set suffered sudden large impacts and inadmissible vibration of the machine while in the secondary regulation regime. The attending personnel had to shut down the turbine and discover the cause of the failure. The reinstatement of the TG 1 turbine was realised during 15 days in continual regime because TG 1 turbine is back-up power supply for the Bohunice NPP. (author)

  3. The Hetex small-scale hydro plant

    International Nuclear Information System (INIS)

    Guentert, P.; Boller, F.; Wanner, A.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the 400 kW small hydroelectric power plant (SHP) installed on the Aabach stream in Niederlenz, Switzerland. With a maximum water-flow of 4.5 m 3 /s, the turbine can produce about 1.5 GWh of electricity per year. In spring 2005, bearing damage necessitated substantial renovation to the turbine and the generator. This study examines the state of the rest of the plant noted during maintenance work. It also focuses on the feeding of the electricity produced into the grid, the effects of increased residual water-flow, the option of using the Hallwilersee lake as a buffer, upstream flood evacuation and the possibility of green electricity certification. The calculation of the amount of water available is discussed. Due to inconsistent data, a corrected flow-duration curve was used. For the local river authorities, the through passage for fish from the Aare river up to the Hallwilersee has a high priority. The Hetex SHP weir is one of nine barriers to a direct connection. The planning of a fish-pass to be built in 2006 is discussed

  4. TVA is no longer just another utility - Freeman

    International Nuclear Information System (INIS)

    Bailey, M.; Freeman, S.D.

    1984-01-01

    An interview with former Tennessee Valley Authority (TVA) chairman S. David Freeman finds him positive about TVA's future in continuing to demonstrate that the public interest dominates over the short-term interest. Cancelling eight nuclear plants were the board's most difficult decisions, and those decisions were delayed by a lack of accurate load forecasts and a need to educate the public. The halt to overbuilding and its goal of a 7% drop in demand by 1990 will keep TVA rates moderate. The area's abundant coal will be burned in an environmentally sound manner in the 12 coal-fired plants. There will also be 9 nuclear plants and, by the next century, integrated photovoltaic cells. Freeman credits TVA's success to hard work and new management. He considers himself neutral, but critical, of nuclear power because of the failure to develop sound waste managment. He faults the Reagan administration for failing to impose appliance efficiency standards

  5. It's done... or the unmanned operation in hydro power plants

    International Nuclear Information System (INIS)

    Chudy, M.

    2009-01-01

    Looking back at the two years of activities performed while launching the individual Hydro Power Plants (HPP) of the Slovenske elektrarne, a.s. into the unmanned operation, there was 'quantum' of work done during the implementation of each new HPP in the area of group output regulation, substation management, failure and alarm record and evaluation system, technological and information service. It is a good feeling to see the results of the work - when it works. Someone could say that we just test the project at one HPP and the others just get implemented. The fact that the HPPs differ from each other brings its specifics, which needed to be handled individually in the SW or HW area, or in terms of communication. We should definitely mention the enthusiasm and helpfulness of the employees even at the cost of their free time spent in launching the power plants into unmanned operation. The reward for the hours spent dealing with the technical issues and revealing the shortcomings in the whole operation management process is today in the greater possibilities of gaining an overviews of the events in the operation of each HPP or TG generation unit. However, our hands are little less free to perform interventions in the control systems - time for the maintenance - necessary planning of the outages - coordination within the operation preparation. (author)

  6. Small hydro plant- present scenario and future prospects

    International Nuclear Information System (INIS)

    Purohit, D.P.

    1996-01-01

    The article, deals with the methodology of power generation by small hydro power resources, especially in the Himalayan and sub Himalayan regions and the benefits it will bestow to the inhabitants of this region. The development of small hydro power projects in the Himalayas and sub Himalayas would serve as a model for environment- friendly sources of energy to benefit small communities world wide. The use of water turbine generators for the generation of cheaper power is also discussed. 4 refs

  7. Penstock failure detection system at the 'Valsan' hydro power plant

    International Nuclear Information System (INIS)

    Georgescu, A M; Coşoiu, C I; Alboiu, N; Hlevca, D; Tataroiu, R; Popescu, O

    2012-01-01

    'Valsan' is a small Hydro Power Plant, 5 MW, situated at about 160 km north of Bucharest, Romania, on the small 'Valsan' river in a remote mountainous area. It is equipped with a single Francis turbine. The penstock is located in the access shaft of the HPP. 'Hidroelectrica', the Romanian company that operates the HPP, was trying to implement a remote penstock failure detection system. Starting from a classic hydraulic problem, the authors of the paper derived a method for failure detection and localization on the pipe. The method assumes the existence of 2 flow meters and 2 pressure transducers at the inlet and outlet of the pressurized pipe. Calculations have to be based on experimental values measured in a permanent regime for different values of the flow rate. The method was at first tested on a pipe, in the Hydraulic Laboratory of the Technical University of Civil Engineering Bucharest. Pipe failure was modelled by opening of a valve on a tee branch of the analyzed pipe. Experimental results were found to be in good agreement with theoretical ones. The penstock of the 'Valsan' HPP, was modelled in EPANET, in order to: i) test the method at a larger scale; ii) get the right flow and pressure transducers that are needed to implement it. At the request of 'Hidroelectrica' a routine that computes the efficiency of the turbine was added to the monitoring software. After the system was implemented, another series of measurements were performed at the site in order to validate it. Failure was modelled by opening an existing valve on a branch of the penstock. Detection of the failure was correct and almost instantaneous, while failure location was accurate within 5% of the total penstock length.

  8. Penstock failure detection system at the "Valsan" hydro power plant

    Science.gov (United States)

    Georgescu, A. M.; Coşoiu, C. I.; Alboiu, N.; Hlevca, D.; Tataroiu, R.; Popescu, O.

    2012-11-01

    "Valsan" is a small Hydro Power Plant, 5 MW, situated at about 160 km north of Bucharest, Romania, on the small "Valsan" river in a remote mountainous area. It is equipped with a single Francis turbine. The penstock is located in the access shaft of the HPP. "Hidroelectrica", the Romanian company that operates the HPP, was trying to implement a remote penstock failure detection system. Starting from a classic hydraulic problem, the authors of the paper derived a method for failure detection and localization on the pipe. The method assumes the existence of 2 flow meters and 2 pressure transducers at the inlet and outlet of the pressurized pipe. Calculations have to be based on experimental values measured in a permanent regime for different values of the flow rate. The method was at first tested on a pipe, in the Hydraulic Laboratory of the Technical University of Civil Engineering Bucharest. Pipe failure was modelled by opening of a valve on a tee branch of the analyzed pipe. Experimental results were found to be in good agreement with theoretical ones. The penstock of the "Valsan" HPP, was modelled in EPANET, in order to: i) test the method at a larger scale; ii) get the right flow and pressure transducers that are needed to implement it. At the request of "Hidroelectrica" a routine that computes the efficiency of the turbine was added to the monitoring software. After the system was implemented, another series of measurements were performed at the site in order to validate it. Failure was modelled by opening an existing valve on a branch of the penstock. Detection of the failure was correct and almost instantaneous, while failure location was accurate within 5% of the total penstock length.

  9. TVA GIS-based biomass resource assessment

    Energy Technology Data Exchange (ETDEWEB)

    Noon, C.E. [Univ. of Tennessee, Knoxville, TN (United States)

    1993-12-31

    The focus of this paper is a computer-based system for estimating the costs of supplying wood fuel. The system is being developed for the Tennessee Valley Authority and is referred to as the Biomass Resource Assessment Version One (BRAVO) system. The main objective in developing the BRAVO system is to assist TVA in estimating the costs for supplying wood fuel to any one of its twelve coal-fired plants. The BRAVO system is developed within a Geographic Information System (GIS) platform and is designed to allow a user to perform {open_quotes}what if{close_quotes} analyses related to the costs of wood fuel supply. Three types of wood fuel are considered in the BRAVO system: mill residues, logging residues and short-rotation woody crops (SRWC). Each type of wood fuel has unique economic and supply characteristics. The input data for the system includes the specific locations, amount, and prices of the various types of wood fuel throughout the TVA region. The system input is completed by data on political boundaries, power plant locations, road networks and a model for estimating transportation costs as a function of distance. The result is a comprehensive system which includes information on all possible wood fuel supply joints, demand points and product movement costs. In addition, the BRAVO system has been designed to allow a user to perform sensitivity analysis on a variety of supply system parameters. This will enable TVA to thoroughly investigate the financial impacts of issues such as increased competition for wood fuel, environmental policies, fuel taxes, and regional economic cycles.

  10. TVA GIS-based biomass resource assessment

    International Nuclear Information System (INIS)

    Noon, C.E.

    1993-01-01

    The focus of this paper is a computer-based system for estimating the costs of supplying wood fuel. The system is being developed for the Tennessee Valley Authority and is referred to as the Biomass Resource Assessment Version One (BRAVO) system. The main objective in developing the BRAVO system is to assist TVA in estimating the cost for supplying wood fuel to any one of its twelve coal-fired power plants. The BRAVO system is developed within a Geographic Information System (GIS) platform and is designed to allow a user to perform open-quotes what ifclose quotes analyses related to the costs of wood fuel supply. Three types of wood fuel are considered in the Bravo system: mill residues, logging residues and short-rotation woody crops (SRWC). Each type of wood fuel has unique economic and supply characteristics. The input data for the system includes the specific locations, amounts, and prices of the various types of wood fuel throughout the TVA region. The system input is completed by data on political boundaries, power plant locations, road networks and a model for estimating transportation costs as a function of distance. The result is a comprehensive system which includes information on all possible wood fuel supply points, demand points and product movement costs. In additions, the BRAVO system has been designed to allow a user to perform sensitivity analysis on a variety of supply system parameters. This will enable TVA to thoroughly investigate the financial impacts of issues such as increased competition for wood fuel, environmental policies, fuel taxes, and regional economic cycles

  11. Analysis of Axial Turbine Pico-Hydro Electrical Power Plant in North Sulawesi Indonesia

    Science.gov (United States)

    Sangari, F. J.; Rompas, P. T. D.

    2018-02-01

    This study presents analysis of pico-hydro electrical power plant in North Sulawesi, Indonesia. The objective of this study is to get a design of axial turbine pico-hydro electrical power plant. The method used the study of literature, survey the construction site of the power plant and the characteristics of the location being a place of study, analysis of hydropower ability and analyzing costs of power plant. The result showed that the design of axial turbine pico-hydro installation is connected to a generator to produce electrical energy maximum can be used for household needs in villages. This analyze will be propose to local government of Minahasa, North Sulawesi, Indonesia.

  12. An approach to the investment analysis of small and medium hydro-power plants

    DEFF Research Database (Denmark)

    Forouzbakhsh, Farshid; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Sincea large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments,however it is possible...

  13. Gross greenhouse gas fluxes from hydro-power reservoir compared to thermo-power plants

    International Nuclear Information System (INIS)

    Santos, Marco Aurelio dos; Pinguelli Rosa, Luiz; Sikar, Bohdan; Sikar, Elizabeth; Santos, Ednaldo Oliveira dos

    2006-01-01

    This paper presents the findings of gross carbon dioxide and methane emissions measurements in several Brazilian hydro-reservoirs, compared to thermo power generation. The term 'gross emissions' means gas flux measurements from the reservoir surface without natural pre-impoundment emissions by natural bodies such as the river channel, seasonal flooding and terrestrial ecosystems. The net emissions result from deducting pre-existing emissions by the reservoir. A power dam emits biogenic gases such as CO 2 and CH 4 . However, studies comparing gas emissions (gross emissions) from the reservoir surface with emissions by thermo-power generation technologies show that the hydro-based option presents better results in most cases analyzed. In this study, measurements were carried in the Miranda, Barra Bonita, Segredo, Tres Marias, Xingo, and Samuel and Tucurui reservoirs, located in two different climatological regimes. Additional data were used here from measurements taken at the Itaipu and Serra da Mesa reservoirs. Comparisons were also made between emissions from hydro-power plants and their thermo-based equivalents. Bearing in mind that the estimated values for hydro-power plants include emissions that are not totally anthropogenic, the hydro-power plants studied generally posted lower emissions than their equivalent thermo-based counterparts. Hydro-power complexes with greater power densities (capacity/area flooded-W/m 2 ), such as Itaipu, Xingo, Segredo and Miranda, have the best performance, well above thermo-power plants using state-of-the-art technology: combined cycle fueled by natural gas, with 50% efficiency. On the other hand, some hydro-power complexes with low-power density perform only slightly better or even worse than their thermo-power counterparts

  14. Hydro-engineering structure and Liptovska Mara Pumped Storage Power Plant

    International Nuclear Information System (INIS)

    Regula, E.

    2005-01-01

    In this paper thirty years history of the Hydro-engineering structure and Liptovska Mara Pumped Storage Power Plant (PSPP) is presented. In 1975 year the Liptovska Mara PSPP was commissioned. There are 2 Kaplan turbines and 2 Derezias reversible turbines with a total installed power 198 MW. The average annual output is 134.5 GWh. As a part of this hydro-engineering structure is Besenova Small-scale power plants with 2 turbines and with installed power 4.64 MW. The average annual output consists 18.3 GWh. There up to end of 2004 year 3,620.172 MWh of electricity was produced. Environmental effects are discussed

  15. Impact on the aquatic environment of hydro-peaking in hydroelectric plants

    International Nuclear Information System (INIS)

    Sabaton, C.; Lauters, F.; Valentin, S.

    1996-01-01

    There are a number of types of hydroelectric installations on French rivers. Some of these intermittently turbine water stored in dammed reservoirs, in order to use available reserves at the most opportune moment for power generation. These plants, run under 'hydro-peaking' management procedures, cause variations in discharge in river sections downstream of the restitution, on a daily or weekly scale. To answer questions concerning the impact of such variations in discharge on the aquatic environment, EDF launched a research program aimed at describing and better understanding the physical and biological phenomena related to hydro-peaking and assessing the possible impact of this type of plant management on French streams. Seven sites subjects to hydro-peaking were studied on rivers with mean flow rates lower than 20 m 3 /s (which corresponds to over 65 % of EDF hydro-peaking sites). Four themes in particular were examined: hydraulic characterization of hydro-peaking, modifications in thermal regime and water quality, response of benthic invertebrates and response of fish populations to hydro-peaking. For fish as well as for invertebrates, the role of the base discharge - in the absence of peaking flow - and that of the morphology of the river bed (and, in particular, the presence of shelter for fish) during periods of strong discharge were clearly highlighted. Impact assessment requires a precise diagnosis of the state of biocenoses. To carry out such a diagnosis, one must reason in terms of species, life phase (particularly the most sensitive phases) and population structure as well as the type of stream and the faunizone involved. A risk assessment is possible by means of simultaneous study of the morphology of the river bed and the response of the signal generated by hydro-peaking in terms of hydrology and physical characteristics downstream of the restitution. (authors)

  16. Electricity production by hydro power plants: possibilities of forecasting

    International Nuclear Information System (INIS)

    Barkans, J.; Zicmane, I.

    2004-01-01

    Hydro energy accounts for 17% of global electricity production and is the most important source of renewable energies actively used today, being at the same time the least influential ecologically. Its only disadvantages is that this kind of energy is difficult to forecast, which hinders not only the planning of tariffs, year budgets and investments, but also contractual negotiations in particular month. The paper shows that the forecasting of hydro energy production can be linked to certain natural processes, namely, to the cyclic behaviour observed for water flows of the world's rivers. The authors propose a method according to which the forecasting procedure is performed using the data of observations as signals applied to special digital filters transforming the water flow process into integral and differential forms, which after appropriate treatment are expected again in usual water flow units. For this purpose the water flow integral function is to be divided, by means of spectral analysis, into 'low-frequency' (with a semi-period of 44 years) and 'high-frequency' (4-6 year semi-periods) components, which are of different origin. Each of them should be forecasted separately, with the following summation of the results. In the research it is shown that the cyclic fluctuations of world rivers' water flows are directly associated with variations in the Solar activity. (authors)

  17. Determination of installation capacity in reservoir hydro-power plants considering technical, economical and reliability indices

    DEFF Research Database (Denmark)

    Hosseini, S.M.H.; Forouzbakhsh, Farshid; Fotouh-Firuzabad, Mahmood

    2008-01-01

    One of the most important issues in planning the ‘‘reservoir” type of hydro-power plants (HPP) is to determine the installation capacity of the HPPs and estimate its annual energy value. In this paper, a method is presented. A computer program has been developed to analyze energy calculation...

  18. Global analysis of a renewable micro hydro power generation plant

    Science.gov (United States)

    Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul

    2017-12-01

    Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.

  19. DAILY SCHEDULING OF SMALL HYDRO POWER PLANTS DISPATCH WITH MODIFIED PARTICLES SWARM OPTIMIZATION

    Directory of Open Access Journals (Sweden)

    Sinvaldo Rodrigues Moreno

    2015-04-01

    Full Text Available This paper presents a new approach for short-term hydro power scheduling of reservoirs using an algorithm-based Particle Swarm Optimization (PSO. PSO is a population-based algorithm designed to find good solutions to optimization problems, its characteristics have encouraged its adoption to tackle a variety of problems in different fields. In this paper the authors consider an optimization problem related to a daily scheduling of small hydro power dispatch. The goal is construct a feasible solution that maximize the cascade electricity production, following the environmental constraints and water balance. The paper proposes an improved Particle Swarm Optimization (PSO algorithm, which takes advantage of simplicity and facility of implementation. The algorithm was successfully applied to the optimization of the daily schedule strategies of small hydro power plants, considering maximum water utilization and all constraints related to simultaneous water uses. Extensive computational tests and comparisons with other heuristics methods showed the effectiveness of the proposed approach.

  20. An approach to the investment analysis of small and medium hydro-power plants

    International Nuclear Information System (INIS)

    Forouzbakhsh, F.; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in 'Bookan, Iran' and SHPP in 'Nari, Iran'), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially

  1. 'Matka 2' Hydroelectric Power Plant slip in the chain hydro energetic objects of the Treska River

    International Nuclear Information System (INIS)

    Danevski, Stavre

    2004-01-01

    The paper deals with the project for rational use of the Treska River. The concept of this project is utilization of the hydro-power potential of the Treska River through the subsystem 'Kozjak-Matka' which encompasses realization of three cascade hydroelectric power plants. The proposed and accepted design concepts of the machine hall and plant facilities in HPP 'St. Petka' (formerly named HPP Matka 2) are presented

  2. SMALL HYDRO PLANTS IN LAND USE SYSTEM PLANNING IN POLAND

    Directory of Open Access Journals (Sweden)

    Anita Bernatek

    2014-10-01

    Full Text Available Small hydropower plants are present in the land use system planning in Poland. At the national level the important role of spatial planning in the development of renewable energy was highlighted, included small hydroplants. However, it seems that at the regional level this demand has not been realized. The necessity of developing small hydroplants as a renewable energy was highlighted, but negative environmental impact was not indicated. At local level legal instrument of small hydropower plants is specified.

  3. Operating experiences with Neutron Overpower Trip Systems in Ontario Hydro's CANDU nuclear plants

    International Nuclear Information System (INIS)

    Hnik, J.; Kozak, J.

    1991-01-01

    Operating experiences with Neutron Over Power Trip (NOP) Systems in different Ontario Hydro CANDU nuclear power plants are discussed. Lessons learned from the system operation and their impact on design improvements are presented. Retrofitting of additional tools, such as Shutdown System Monitoring computers, to improve operator interaction with the system is described. Experiences with the reliability of some of the NOP system components is also discussed. Options for future enhancements of system performance and operability are identified. (author)

  4. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    OpenAIRE

    Febijanto, Irhan

    2013-01-01

    Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from ...

  5. Comparison of simulated and measured response of load rejection on A hydro power plant model with mixed mode nonlinear controller

    Energy Technology Data Exchange (ETDEWEB)

    Babunski, Darko; Tuneski, Atanasko; Zaev, Emil [Faculty of Mechanical Engineering, ' Ss. Cyril and Methodius' University, Skopje (Macedonia, The Former Yugoslav Republic of)

    2014-07-01

    Revised Hydro Power Plant model of the IEEE working group recommended converted to state space model is used for simulation of transient response of hydro turbine, and verification was made using measurements of transients from real Hydro Power Plant (HPP). Nonlinear mixed model controller was designed and implemented into complete HPP simulation model and compared with PID with real parameters used in HPP, and with adjusted PID parameters with consideration of smallest frequency error. Verification of performance of the model was made comparing model response with measured load rejection, which is worst case of HPP operation. (Author)

  6. Optimal operation of a pumped-storage hydro plant that compensates the imbalances of a wind power producer

    OpenAIRE

    Duque, Álvaro Jaramillo; Castronuovo, Edgardo D.; Sánchez, Ismael; Usaola, Julio

    2011-01-01

    The participation of wind energy in electricity markets requires providing a forecast for future energy production of a wind generator, whose value will be its scheduled energy. Deviations from this schedule because of prediction errors could imply the payment of imbalance costs. In order to decrease these costs, a joint operation between a wind farm and a hydro-pump plant is proposed; the hydro-pump plant changes its production to compensate wind power prediction errors. In order to optimize...

  7. Comparative fate of an organochlorine, chlordecone, and a related compound, chlordecone-5b-hydro, in soils and plants.

    Science.gov (United States)

    Clostre, Florence; Cattan, Philippe; Gaude, Jean-Marie; Carles, Céline; Letourmy, Philippe; Lesueur-Jannoyer, Magalie

    2015-11-01

    We address the problem of the comparative environmental fate of a pesticide, chlordecone (CLD), and a related compound, chlordecone-5b-hydro (CLD-5b-hydro). We used a large database including data from two types of contaminated volcanic soils, andosol and nitisol, and thirteen crops grown in the French West Indies in historically polluted soils. We performed in-depth statistical analysis of the effect of different parameters (soil type, crop, organ, etc.) on the ratio of CLD-5b-hydro to CLD in both soils and plants. The environmental fate of the two compounds differed depending on the type of soil. Proportionally, more CLD-5b-hydro than CLD was measured in nitisols than in andosols. Compared to CLD, we also found a preferential transfer of CLD-5b-hydro from the soil to the plant. Finally, mobilization of the two compounds differed according to the species of crop but also within the plant, with increasing ratios from the roots to the top of the plant. The properties of the compound played a key role in the underlying processes. Because CLD-5b-hydro is more soluble in water and has a lower K(ow) than CLD, CLD-5b-hydro (1) was more easily absorbed from soils by plants, (2) was less adsorbed onto plant tissues and (3) was transported in greater quantities through the transpiration stream. Due to the amounts of CLD-5b-hydro we measured in some plant parts such as cucurbit fruits, an assessment of the toxicity of this CLD monodechlorinated product is recommended. Copyright © 2015 Elsevier B.V. All rights reserved.

  8. Conceptual design of planetary gearbox system for constant generator speed in hydro power plant

    Directory of Open Access Journals (Sweden)

    Bhargav

    2018-01-01

    Full Text Available Micro Hydro Power Plant (MHPP is emerging as one of the most clean, renewable and reliable energy technology for harnessing power. In MHPP hydro governors are avoided, that results in turbine speed fluctuation. MHPP requires either speed or torque amplification of generator for constant power generation. To achieve this, planetary gear transmission system is explored for MHPP due to its higher efficiency and compact size. A conceptual planetary gearbox system is developed for MHPP to maintain constant generator speed. The conceptual gearbox is designed, modelled and analysed using ADAMS software. Simulation results are found to be in close agreement with analytical results. Hence, conceptual design of planetary gearbox can be used to govern constant generator speed. In this paper, a MHPP which generate constant power of 5 kW at constant generator speed of 1490 rpm is analysed and validated

  9. An approach to the investment analysis of small and medium hydro-power plants

    Energy Technology Data Exchange (ETDEWEB)

    Forouzbakhsh, F. [University of Tehran (Iran). Faculty of Engineering; Hosseini, S.M.H. [Islamic Azad University, Tehran (Iran). Faculty of Engineering; Vakilian, M. [Sharif Institute of Technology, Tehran (Iran). Faculty of Electrical Engineering

    2007-02-15

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in ''Bookan, Iran'' and SHPP in ''Nari, Iran''), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially. (author)

  10. The application of the EMAS-ordinance to small hydro-power-plants

    International Nuclear Information System (INIS)

    Patek, R.

    2000-01-01

    The application of the eco-management and audit scheme ordinance to small hydro-power-plants deals with the possibility to take an environmental-relevant audition on sites of small hydro-power-plants to achieve the environmental EMAS-certificate. Within the realization of the acquired improvement steps also the efficiency of the power plants should be increased that the audit also becomes interesting in economic matters. Contents: after explaining the legal frame being prescribed by the European Community, its interpretation and relevance for the sites of SHP, common impacts of these on the environment are particularized. From these facts a valuation-catalogue has been developed, which will be used by the power plant-owners for the assessment of their sites to take part in the EMAS-system. This catalogue is split up into six modules, which comprise all possible valuation areas which can appear concerning the different kinds of plants. These modules are: MODUL A: backwater area; MODUL B: weir; MODUL C: powerhouse; MODUL D: tail water area; MODUL E: diversion channel / penstock; MODUL F: diversion section. Furthermore three submodules to gather common data concerning plant and river have been created. At the development of the catalogue there was particularly attached importance to a user-friendly application. The goal was to realize the valuation by the plant owners to minimize costs. To take objectiveness into account the module-catalogue was created in a way that auditors (the power plant owners) must not formulate specifications by themselves; the possible assessments only have to be marked with a cross at the corresponding parameters, which have been listed up. (author)

  11. Integrity and life estimation of turbine runner cover in a hydro power plant

    Directory of Open Access Journals (Sweden)

    A. Sedmak

    2016-03-01

    Full Text Available This paper presents integrity and life estimation of turbine runner cover in a vertical pipe turbines, Kaplan 200 MW nominal output power, produced in Russia, and built in six hydro-generation units of hydroelectric power plant „Đerdap 1” in Serbia. Fatigue and corrosion-fatigue interaction have been taken into account using experimentally obtained material properties, as well as analytical and numerical calculations of stress state, to estimate appropriate safety factors. Fatigue crack growth rate, da/dN, was also calculated, indicated that internal defects of circular or elliptical shape, found out by ultrasonic testing, do not affect reliable operation of runner cover.

  12. OVERVIEW OF A NEW METHOD FOR DESIGNING HIGH EFFICIENCY SMALL HYDRO POWER PLANTS

    Directory of Open Access Journals (Sweden)

    Milun Babić

    2010-01-01

    Full Text Available Significant number of research projects in the area of renewable energy sources (especially for small hydro power plants has been made within the Department for Energy and Process Engineering and Regional Euro Energy Efficiency Center at Faculty of Mechanical Engineering (University of Kragujevac, Serbia since early eighties. The results are various; numerous domestic and international recognition and technical performance tell about the success of the research. Research projects have been following the technical and technological development of research equipment and economy growth. This has led to the development of software for designing turbines of SHP plants. In order to notify the public about possibilities of our software, in this paper is briefly described a mathematical model and procedures for calculating and designing of SHPP for known conditions. As an argument for assessing the validity and potential of our research results is shown constructed SHP plant "Bosnia 1", 2 x 100 kW power.

  13. Long-term generation scheduling of Xiluodu and Xiangjiaba cascade hydro plants considering monthly streamflow forecasting error

    International Nuclear Information System (INIS)

    Xie, Mengfei; Zhou, Jianzhong; Li, Chunlong; Zhu, Shuang

    2015-01-01

    Highlights: • Monthly streamflow forecasting error is considered. • An improved parallel progressive optimality algorithm is proposed. • Forecasting dispatching chart is manufactured accompanying with a set of rules. • Applications in Xiluodu and Xiangjiaba cascade hydro plants. - Abstract: Reliable streamflow forecasts are very significant for reservoir operation and hydropower generation. But for monthly streamflow forecasting, the forecasting result is unreliable and it is hard to be utilized, although it has a certain reference value for long-term hydro generation scheduling. Current researches mainly focus on deterministic scheduling, and few of them consider the uncertainties. So this paper considers the forecasting error which exists in monthly streamflow forecasting and proposes a new long-term hydro generation scheduling method called forecasting dispatching chart for Xiluodu and Xiangjiaba cascade hydro plants. First, in order to consider the uncertainties of inflow, Monte Carlo simulation is employed to generate streamflow data according to the forecasting value and error distribution curves. Then the large amount of data obtained by Monte Carlo simulation is used as inputs for long-term hydro generation scheduling model. Because of the large amount of streamflow data, the computation speed of conventional algorithm cannot meet the demand. So an improved parallel progressive optimality algorithm is proposed to solve the long-term hydro generation scheduling problem and a series of solutions are obtained. These solutions constitute an interval set, unlike the unique solution in the traditional deterministic long-term hydro generation scheduling. At last, the confidence intervals of the solutions are calculated and forecasting dispatching chart is proposed as a new method for long-term hydro generation scheduling. A set of rules are proposed corresponding to forecasting dispatching chart. The chart is tested for practical operations and achieves

  14. A Comparison of Prediction Methods for Design of Pump as Turbine for Small Hydro Plant: Implemented Plant

    Science.gov (United States)

    Naeimi, Hossein; Nayebi Shahabi, Mina; Mohammadi, Sohrab

    2017-08-01

    In developing countries, small and micro hydropower plants are very effective source for electricity generation with energy pay-back time (EPBT) less than other conventional electricity generation systems. Using pump as turbine (PAT) is an attractive, significant and cost-effective alternative. Pump manufacturers do not normally provide the characteristic curves of their pumps working as turbines. Therefore, choosing an appropriate Pump to work as a turbine is essential in implementing the small-hydro plants. In this paper, in order to find the best fitting method to choose a PAT, the results of a small-hydro plant implemented on the by-pass of a Pressure Reducing Valve (PRV) in Urmia city in Iran are presented. Some of the prediction methods of Best Efficiency Point of PATs are derived. Then, the results of implemented project have been compared to the prediction methods results and the deviation of from measured data were considered and discussed and the best method that predicts the specifications of PAT more accurately determined. Finally, the energy pay-back time for the plant is calculated.

  15. Effect of turbine materials on power generation efficiency from free water vortex hydro power plant

    International Nuclear Information System (INIS)

    Sritram, P; Treedet, W; Suntivarakorn, R

    2015-01-01

    The objective of this research was to study the effect of turbine materials on power generation efficiency from the water free vortex hydro power plant made of steel and aluminium. These turbines consisted of five blades and were twisted with angles along the height of water. These blades were the maximum width of 45 cm. and height of 32 cm. These turbines were made and experimented for the water free vortex hydro power plant in the laboratory with the water flow rate of 0.68, 1.33, 1.61, 2.31, 2.96 and 3.63 m 3 /min and an electrical load of 20, 40, 60, 80 and 100 W respectively. The experimental results were calculated to find out the torque, electric power, and electricity production efficiency. From the experiment, the results showed that the maximum power generation efficiency of steel and aluminium turbine were 33.56% and 34.79% respectively. From the result at the maximum water flow rate of 3.63 m 3 /min, it was found that the torque value and electricity production efficiency of aluminium turbine was higher than that of steel turbine at the average of 8.4% and 8.14%, respectively. This result showed that light weight of water turbine can increase the torque and power generation efficiency. (paper)

  16. Small hydro

    International Nuclear Information System (INIS)

    Bennett, K.; Tung, T.

    1995-01-01

    A small hydro plant in Canada is defined as any project between 1 MW and 15 MW but the international standard is 10 MW. The global market for small hydro development was considered good. There are some 1000 to 2000 MW of generating capacity being added each year. In Canada, growth potential is considered small, primarily in remote areas, but significant growth is anticipated in Eastern Europe, Africa and Asia. Canada with its expertise in engineering, manufacturing and development is considered to have a good chance to take advantage of these growing markets

  17. Feasibility study of VLH hydro turbine installation at Nam Pung hydropower plant, Thailand

    Directory of Open Access Journals (Sweden)

    Weerapon Nuantong

    2016-10-01

    Full Text Available The aim of this research was to study the feasibility of installing a Very Low Head (VLH hydro turbine at downstream of the Nam Pung hydropower plant by increasing the potential of renewable energy sources for the Electricity Generating Authority of Thailand (EGAT. Due to the constraints of the local site, the water head level was limited to less than 2 meters and the flow rate to below 5 m3/ s. The hydro turbine selected was an axial flow turbine with performance of 86.4%. The outcome of the power output was 84.61 kW. Investment analysis was subsequently applied to estimate feasibility of the project using engineering economics. The analyses of results have shown that the project is worthwhile in terms of an investment decision. The payback period of actual price was 0.83 and 0.88 years and general price case of 3.68 and 4.04 years, along with an interest rate of 6.75% and 12.625% respectively. Projected project lifespan is 25 years.

  18. Retrofitting the small-scale hydro power plant 'La Chocolatiere' in Echandens-Bussigny, Switzerland

    International Nuclear Information System (INIS)

    2008-05-01

    This report for the Swiss Federal Office of Energy (SFOE) is a project study for the retrofitting of a small-scale hydro power plant installed on the River Venoge, between the communities of Echandens and Bussigny, western Switzerland. At this site, hydro power is used since the 18 th century. A permanent license to use at most 3 m 3 /s is available. The study concludes that the maximum flow rate of 6 m 3 /s would be more advantageous, implying a 35 cm higher dam on the river. Two turbines could then be installed, leading to the maximum electric power of 177 kW and the power production of 727,000 kWh/y. From the detailed inventory of the retrofitting work and the installation of the new turbines - including a new fish ladder according to the legislation in force - the authors conclude that electricity could be generated at a cost amounting to about CHF 0.24/kWh. It is recommended to request the modification of the water use license in order to be able to use up to 6 m 3 /s.

  19. Real-time meteorological data flow in support of TVA's radiological emergency plan

    International Nuclear Information System (INIS)

    Hunter, C.H.; Pittman, D.E.; Malo, J.E.

    1985-01-01

    The Tennessee Valley Authority (TVA) presently operates two nuclear power plants - Browns Ferry (3 units) and Sequoyah (2 units). Two additional plants are under construction. These are Watts Bar scheduled for commercial operation later this year, and Bellefonte (2 units), scheduled for operation near the end of the decade. Under regulations promulgated under 10 CFR Part 50, TVA has developed a Radiological Emergency Plan (REP) to facilitate assessment of the effects of a radiological accident at any of the operational plants. As part of the REP, TVA has developed a system for collecting, displaying, and reviewing, and disseminating real-time meteorological information collected at the nuclear plant sites. The flow of this information must be reliable and continuous so that prompt, informed decisions are possible. This system has been designed using guidance provided in applicable Nuclear Regulatory Commission (NRC) documents, most notably Supplement 1 to NUREG-0737 and Regularoty Guide (R.G.) 1.23. This paper presents a brief description of the REP meteorological support. Meteorological support for nuclear plant emergency preparedness at TVA nuclear plants has been provided for several years. The system has undergone numerous changes during this time, reflecting changes in regulatory guidance and experience gained in implementing the system through numerous drills and exercises. A brief discussion of some of this experience is also presented

  20. Reliability database development and plant performance improvement effort at Korea Hydro and Nuclear Power Co

    International Nuclear Information System (INIS)

    Oh, S. J.; Hwang, S. W.; Na, J. H.; Lim, H. S.

    2008-01-01

    Nuclear utilities in recent years have focused on improved plant performance and equipment reliability. In U.S., there is a movement toward process integration. Examples are INPO AP-913 equipment reliability program and the standard nuclear performance model developed by NEI. Synergistic effect from an integrated approach can be far greater than as compared to individual effects from each program. In Korea, PSA for all Korean NPPs (Nuclear Power Plants) has been completed. Plant performance monitoring and improvement is an important goal for KHNP (Korea Hydro and Nuclear Power Company) and a risk monitoring system called RIMS has been developed for all nuclear plants. KHNP is in the process of voluntarily implementing maintenance rule program similar to that in U.S. In the future, KHNP would like to expand the effort to equipment reliability program and to achieve highest equipment reliability and improved plant performance. For improving equipment reliability, the current trend is moving toward preventive/predictive maintenance from corrective maintenance. With the emphasis on preventive maintenance, the failure cause and operation history and environment are important. Hence, the development of accurate reliability database is necessary. Furthermore, the database should be updated regularly and maintained as a living program to reflect the current status of equipment reliability. This paper examines the development of reliability database system and its application of maintenance optimization or Risk Informed Application (RIA). (authors)

  1. A Risk Analysis of Small-Hydro Power (SHP Plants Investments

    Directory of Open Access Journals (Sweden)

    Jorge Cunha

    2014-06-01

    Full Text Available The increase in electricity consumption has led to a sharp increase in energy demand which rose environmental and sustainability concerns. To address this issue, there has been an incentive to resource to renewable energy sources for electricity production. Departing from a real case study, the investment appraisal of a SHP project under the present market conditions is described, followed by a sensitivity analysis in order to identify the main sources of risk. The main results obtained showed that in the context of a regulated tariff the project is worthwhile due to a positive NPV. However, if electricity had to be sold at market prices, the project becomes unprofitable. Theresults put also in evidence the vulnerability of the investment to an adverse change in interest rates. Future SHP plant investments should take into account the need to operate in a free market and to compete with technologies based on fossil fuels or large hydro.

  2. Pumping station design for a pumped-storage wind-hydro power plant

    International Nuclear Information System (INIS)

    Anagnostopoulos, John S.; Papantonis, Dimitris E.

    2007-01-01

    This work presents a numerical study of the optimum sizing and design of a pumping station unit in a hybrid wind-hydro plant. The standard design that consists of a number of identical pumps operating in parallel is examined in comparison with two other configurations, using one variable-speed pump or an additional set of smaller jockey pumps. The aim is to reduce the amount of the wind generated energy that cannot be transformed to hydraulic energy due to power operation limits of the pumps and the resulting step-wise operation of the pumping station. The plant operation for a period of one year is simulated by a comprehensive evaluation algorithm, which also performs a detailed economic analysis of the plant using dynamic evaluation methods. A preliminary study of the entire plant sizing is carried out at first using an optimization tool based on evolutionary algorithms. The performance of the three examined pumping station units is then computed and analyzed in a comparative study. The results reveal that the use of a variable-speed pump constitutes the most effective and profitable solution, and its superiority is more pronounced for less dispersed wind power potential

  3. Feasibility study of a Green Power Plant. Final report. [Offshore pumped hydro storage

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-03-15

    This project is a technical evaluation and a feasibility study of a concept called the Green Power Plant (GPP), developed by Seahorn Energy Aps. The Green Power Plant is an offshore pumped hydro storage facility constructed from prefabricated elements and with integrated renewable energy production. Pumped hydro storage is a known technology with a proven roundtrip energy storage efficiency of 80%. The focus of the GPP project is on simplifying and industrializing the construction of the reservoir wall, thereby achieving a cost efficient solution. The reservoir structure is dependent on the site on which the reservoir is established, thus Kriegers Flak in the Baltic Sea has been chosen as basis for the technical evaluation. As soil conditions vary, the technical evaluations have been based on a general soil profile. A water depth of 25m has been chosen as basis for the evaluation. A reservoir with a diameter of 2 km has been evaluated as baseline scenario. Feasibility of the GPP was evaluated based on the cost and income estimates. For the baseline scenario an internal rate of return of 6.6% was found for a period of 35 years. A sensitivity analysis reveals internal rates of return over 35 years varying from 4.9% to 10.9%. Especially larger reservoir diameters increase profitability of the GPP. The results from this project will be utilized in raising funds for further development of the GPP concept. Seahorn Energy Aps aims at optimizing the wind turbine integration, the steel pile wall structure and the pump-turbine integration in a future project towards construction of a demonstration facility. (LN)

  4. Cost determination of the electro-mechanical equipment of a small hydro-power plant

    Energy Technology Data Exchange (ETDEWEB)

    Ogayar, B.; Vidal, P.G. [Grupo de Investigacion IDEA, Escuela Politecnica Superior, University of Jaen, Campus de Las Lagunillas, s/n. 23071-Jaen (Spain)

    2009-01-15

    One of the most important elements on the recovery of a small hydro-power plant is the electro-mechanical equipment (turbine-alternator), since the cost of the equipment means a high percentage of the total budget of the plant. The present paper intends to develop a series of equations which determine its cost from basic parameters such as power and net head. These calculations are focused at a level of previous study, so it will be necessary to carry out the engineering project and request a budget to companies specialized on the construction of electro-mechanical equipment to know its cost more accurately. Although there is a great diversity in the typology of turbines and alternators, data from manufacturers which cover all the considered range have been used. The above equations have been developed for the most common of turbines: Pelton, Francis, Kaplan and semiKaplan for a power range below 2 MW. The obtained equations have been validated with data from real installations which have been subject to analysis by engineering companies working on the assembly and design of small plants. (author)

  5. Frequency Regulation of a Hybrid Wind–Hydro Power Plant in an Isolated Power System

    Directory of Open Access Journals (Sweden)

    Guillermo Martínez-Lucas

    2018-01-01

    Full Text Available Currently, some small islands with high wind potential are trying to reduce the environmental and economic impact of fossil fuels by using renewable resources. Nevertheless, the characteristics of these renewable resources negatively affect the quality of the electrical energy, causing frequency disturbances, especially in isolated systems. In this study, the combined contribution to frequency regulation of variable speed wind turbines (VSWT and a pump storage hydropower plant (PSHP is analyzed. Different control strategies, using the kinetic energy stored in the VSWT, are studied: inertial, proportional, and their combination. In general, the gains of the VSWT controller for interconnected systems proposed in the literature are not adequate for isolated systems. Therefore, a methodology to adjust the controllers, based on exhaustive searches, is proposed for each of the control strategies. The control strategies and methodology have been applied to a hybrid wind–hydro power plant on El Hierro Island in the Canary archipelago. At present, in this isolated power system, frequency regulation is only provided by the PSHP and diesel generators. The improvements in the quality of frequency regulation, including the VSWT contribution, have been proven based on simulating different events related to wind speed, or variations in the power demand.

  6. Hydro adventurers

    International Nuclear Information System (INIS)

    Wood, Janet

    2000-01-01

    Some of the changes brought about by privatisation of the hydroelectric power industry in Ecuador are discussed. At present, about 25% of the population has no electricity supply; in the remaining areas demand is increasing. Seven new facilities are presently under discussion and these are described briefly. A plant at Abitugua is to be developed as a 'merchant plant' and the meaning and implications of this are described in detail. The present financing programme for Abituaga and an alternative financing programme are detailed. By 2010, some 40% of Ecuador's electricity is expected to come from hydro

  7. Analysis and assessment of environmental impacts of small hydro power plant in Slovakia

    Science.gov (United States)

    Zeleňáková, M.; Fijko, R.; Remeňáková, I.

    2017-10-01

    Environmental impact assessment (EIA) is an important process that, prior to approval of the investment plan, can provide a detailed examination of the likely and foreseeable impacts of proposed construction activity on the environment. The objective of this paper is to apply a specific methodology for the analysis and evaluation of the environmental impacts of selected constructions, namely, small hydro power plant, using matrix of impacts. This analysis method is intended not only to increase the clarity and precision of the evaluation process, but also to align it with the requirements of the environmental impact assessment system. This modification should improve the reliability of the environmental impact assessment, and could moreover also be applied to other infrastructure projects. Comparison of alternatives and designation of the optimal variant are implemented based on selected criteria that objectively describe the characteristic lines of the planned alternatives of activity and their impact on the environment. The use of proper EIA procedures can help the decision-makers to formulate proper activities based on qualified decisions. The designed project in Spišské Bystré, Slovakia is used as a case study to clarify and exemplify the methodology and techniques.

  8. Feasibility analysis of micro hydro plant at nawangan village of pacitan district

    Directory of Open Access Journals (Sweden)

    Diana Dellariam Bayu

    2017-12-01

    Full Text Available Nawangan Village of Pacitan District utilizes Kedung Pasang Micro Hydro Plant (MHP as a power source, but the existing electricity power unable suffice the demand so it needs revitalization by calculating the new unit price and debit because of the previous reference already invalid. The problem is that the investment required for the construction of the MHP must provide benefits for a certain period. This study analyzed the ratio of power and energy potential of MHP with changes in pipe diameter and speed of existing turbines, and calculated the cost. The available power is currently at 112.5 kW and energy is 82150.66 kWh. The results of the analysis show that the power increase can be done up to 142,95 kW a year or equivalent 218%, the energy can be done up to 139.427 kWh a year, meanwhile the benefit is Rp44.566.169, increase Rp26.604.588,- from existing condition or equivalent 148,1% which is done by changing the diameter of penstock and the turbine. Economic analysis of Kedung Pasang MHP development plan shows NPV of Rp6.717.110,- that is greater than 0, the value of IRR is 11% greater than the interest rate set by Bank Negara Indonesia 46 of 10,25% and BCR value of 1,19 is greater than 1, thus the revitalization of Kedung Pasang MHP feasible to be implemented.

  9. Rainfall prediction using fuzzy inference system for preliminary micro-hydro power plant planning

    Science.gov (United States)

    Suprapty, B.; Malani, R.; Minardi, J.

    2018-04-01

    East Kalimantan is a very rich area with water sources, in the form of river streams that branch to the remote areas. The conditions of natural potency like this become alternative solution for area that has not been reached by the availability of electric energy from State Electricity Company. The river water in selected location (catchment area) which is channelled to the canal, pipeline or penstock can be used to drive the waterwheel or turbine. The amount of power obtained depends on the volume/water discharge and headwater (the effective height between the reservoir and the turbine). The water discharge is strongly influenced by the amount of rainfall. Rainfall is the amount of water falling on the flat surface for a certain period measured, in units of mm3, above the horizontal surface in the absence of evaporation, run-off and infiltration. In this study, the prediction of rainfall is done in the area of East Kalimantan which has 13 watersheds which, in principle, have the potential for the construction of Micro Hydro Power Plant. Rainfall time series data is modelled by using AR (Auto Regressive) Model based on FIS (Fuzzy Inference System). The FIS structure of the training results is then used to predict the next two years rainfall.

  10. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    Directory of Open Access Journals (Sweden)

    Irhan Febijanto

    2013-12-01

    Full Text Available Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from carbon market to increase the economic feasibility. Procedure to register the project to United Nation for Climate Change Convention (UNFCCC as a Clean Development Mechanism project was explained in detail. Approved Consolidation Methodology (ACM 0002 Version 12.3.0 was used to calculate grid emission factor in Jawa-Bali-Madura the grid electricity system. It was calculated that the grid emission factor is 0.833 (t-CO2/MWh, and the carbon emission reduction generated for this project is 21,982 ton/year. From the analysis result, it can be proven that the additional revenue from carbon credit could increase the project IRR from 10.28% to 13.52%.

  11. Design process and philosophy of TVA's latest advance control room complex

    International Nuclear Information System (INIS)

    Owens, G.R.; Masters, D.W.

    1979-01-01

    TVA's latest nuclear power plant control room design includes a greater emphasis on human factors as compared to their earlier plant designs. This emphasis has resulted in changes in the overall design philosophy and design process. This paper discusses some of the prominent design features of both the control room and the surrounding control room complex. In addition, it also presents some of the important activities involved in the process of developing the advanced control room design

  12. TVA reaps big savings by letting powerplant work to outside firms

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This abstract is the entire text of the article. In a report to Congress, the Tennessee Valley Authority says its shift to full reliance on outside contractors for powerplant construction and modification work saved a net $54M in the first half of 1992. TVA says that total savings from lower overhead and increased efficiency were $75M, but that was partially offset by $21M in one-time mobilization/de-mobilization charges. TVA has a budget of $1.7B this year for new plant and equipment. That will rise to over $2B in the next two years. About 70% of the work involves nuclear plant work. Several members of Congress from the area criticized TVA in mid-1991 when it cut more than 5,000 hourly construction jobs and several hundred salaried construction jobs. The agency said the cuts let it concentrate on power production and promised to make semi-annual reports to Congress detailing the results of contracting out. In the agency's first report, TVA Chairman John Waters says that it saved $19.2M in personnel costs and staff overhead over the six-month period ending June 30, 1992. At the same time, $21.8M was saved through increased construction efficiency and productivity. Waters also says that the switch caused minimal impact on the local work force. Contractors employed 6,166 craft workers on their TVA projects at mid-year, compared with the 5,200 dropped by the agency in mid-1991

  13. Hydro power plants, an overview of the current types and technology

    Science.gov (United States)

    Tkáč, Štefan

    2018-03-01

    Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  14. Modeling invasive alien plant species in river systems: Interaction with native ecosystem engineers and effects on hydro-morphodynamic processes

    Science.gov (United States)

    van Oorschot, M.; Kleinhans, M. G.; Geerling, G. W.; Egger, G.; Leuven, R. S. E. W.; Middelkoop, H.

    2017-08-01

    Invasive alien plant species negatively impact native plant communities by out-competing species or changing abiotic and biotic conditions in their introduced range. River systems are especially vulnerable to biological invasions, because waterways can function as invasion corridors. Understanding interactions of invasive and native species and their combined effects on river dynamics is essential for developing cost-effective management strategies. However, numerical models for simulating long-term effects of these processes are lacking. This paper investigates how an invasive alien plant species affects native riparian vegetation and hydro-morphodynamics. A morphodynamic model has been coupled to a dynamic vegetation model that predicts establishment, growth and mortality of riparian trees. We introduced an invasive alien species with life-history traits based on Japanese Knotweed (Fallopia japonica), and investigated effects of low- and high propagule pressure on invasion speed, native vegetation and hydro-morphodynamic processes. Results show that high propagule pressure leads to a decline in native species cover due to competition and the creation of unfavorable native colonization sites. With low propagule pressure the invader facilitates native seedling survival by creating favorable hydro-morphodynamic conditions at colonization sites. With high invader abundance, water levels are raised and sediment transport is reduced during the growing season. In winter, when the above-ground invader biomass is gone, results are reversed and the floodplain is more prone to erosion. Invasion effects thus depend on seasonal above- and below ground dynamic vegetation properties and persistence of the invader, on the characteristics of native species it replaces, and the combined interactions with hydro-morphodynamics.

  15. Hydro power plants, an overview of the current types and technology

    OpenAIRE

    Tkáč Štefan

    2018-01-01

    Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy...

  16. Determination and modeling of the influence of the fluid-dynamics in hydro-treating bench scale plants

    Energy Technology Data Exchange (ETDEWEB)

    Burkhardt, T.

    1999-09-16

    At an industrial scale, the hydro-treating of oil fractions is carried out in multiphase fixed bed reactors. The oil and hydrogen cross the catalyst bed, usually in co-current downflow. Since the product specifications are steadily becoming more severe, the testing of new catalysts and of modified operating conditions in pilot plants becomes increasingly important. Although these pilot plants are frequently by a factor of 100 000 smaller than the industrial units, they still have to allow the up-scaling to industrial units. In the literature relatively low conversion degrees in pilot plants are frequently reported, especially in downflow. The significantly lower fluid velocities in pilot plants seem to be responsible for such differences, as the influence of fluid-dynamic non-idealities and of the extra-particle mass transfer phenomena increases with a decrease of the fluid velocities. In the present work, the influence of important fluid-dynamic non-idealities on the hydro-treating of gas oil fractions in pilot plants was examined. This was done on the one hand in experiments with different pilot plants and on the other hand by simulations with an especially developed multiphase model. The phenomena were considered as well in an isolated manner. In order to examine any interactions with the chemical reactions, they were also studied in a reactive system. This methodology was applied to the phenomena, 'axial dispersion'and 'gas-liquid mass transfer'. (author)

  17. Modelling energy production by small hydro power plants in collective irrigation networks of Calabria (Southern Italy)

    Science.gov (United States)

    Zema, Demetrio Antonio; Nicotra, Angelo; Tamburino, Vincenzo; Marcello Zimbone, Santo

    2017-04-01

    The availability of geodetic heads and considerable water flows in collective irrigation networks suggests the possibility of recovery potential energy using small hydro power plants (SHPP) at sustainable costs. This is the case of many Water Users Associations (WUA) in Calabria (Southern Italy), where it could theoretically be possible to recovery electrical energy out of the irrigation season. However, very few Calabrian WUAs have currently built SHPP in their irrigation networks and thus in this region the potential energy is practically fully lost. A previous study (Zema et al., 2016) proposed an original and simple model to site turbines and size their power output as well as to evaluate profits of SHPP in collective irrigation networks. Applying this model at regional scale, this paper estimates the theoretical energy production and the economic performances of SHPP installed in collective irrigation networks of Calabrian WUAs. In more detail, based on digital terrain models processed by GIS and few parameters of the water networks, for each SHPP the model provides: (i) the electrical power output; (iii) the optimal water discharge; (ii) costs, revenues and profits. Moreover, the map of the theoretical energy production by SHPP in collective irrigation networks of Calabria was drawn. The total network length of the 103 water networks surveyed is equal to 414 km and the total geodetic head is 3157 m, of which 63% is lost due to hydraulic losses. Thus, a total power output of 19.4 MW could theoretically be installed. This would provide an annual energy production of 103 GWh, considering SHPPs in operation only out of the irrigation season. The single irrigation networks have a power output in the range 0.7 kW - 6.4 MW. However, the lowest SHPPs (that is, turbines with power output under 5 kW) have been neglected, because the annual profit is very low (on average less than 6%, Zema et al., 2016). On average each irrigation network provides an annual revenue from

  18. The effectiveness of new austrian tunnelling method (NATM for hydro power plant construction: lau gunung power plant, north sumatera, indonesia

    Directory of Open Access Journals (Sweden)

    Ade Khoir Rizki

    2017-01-01

    Full Text Available Hydro Electric Power Plant is a power generating system using gravity fall of water as the main force to move the turbine and generate electricity. The construction purpose of Lau Gunung hydropower (2×7. 5 MW that is located in Dairi, North Sumatra, is to Supply power to 14,000 house of the surrounding region. The river run-off system, where the water is immediately contained and then flowed through a tunnel considering the discharge flowing river, where it is constant and does not occur in the fluctuating water level. The Lau Gunung river has the minimum flow that can exceed from 15 to 25 m3/s with a high tunnel dimensions of 4 metres long, 3,9 metres wide and a length of 1,6 kilometres. In terms of the analysis of the time effectiveness of the NATM can be saved because of the continuous work of 24 hours, without any obstacles in which the sub methods used include the drilling & blasting. The tunnel then use the form of steel reinforcement rib and Safety shotcrete lining. The general review may show that using NATM result a tremendous savings, also the use of horse shape conduce small displacement which is effective for the construction.

  19. Copper-Silver Alloy Depositions Using Thermionic Vacuum ARC (TVA)

    International Nuclear Information System (INIS)

    Akan, T.

    2004-01-01

    TVA is a plasma source generating pure metal vapor plasma and consists of a heated cathode emitting thermo electrons and an anode containing material to be evaporated. We used Cu and Ag pieces as anode materials and produced their alloys by electron bombarding. Cu-Ag alloys in various mass ratios were prepared by using the TVA and the TVA discharges were generated in the vapors of these alloys. The volt-ampere characteristics of the TVA discharges generated in the vapors of these alloys were investigated with respect to the ratio of Ag in the Cu-Ag alloy. Cu-Ag alloy thin films with various mass ratios were deposited onto the glass substrates by using their TVA discharges. The ratios of Cu and Ag in the thin Cu-Ag alloy films were found using scanning electron microscope-energy dispersive xray (SEM-EDX) microanalyses

  20. Optimal sizing of utility-scale photovoltaic power generation complementarily operating with hydropower: A case study of the world’s largest hydro-photovoltaic plant

    International Nuclear Information System (INIS)

    Fang, Wei; Huang, Qiang; Huang, Shengzhi; Yang, Jie; Meng, Erhao; Li, Yunyun

    2017-01-01

    Highlights: • Feasibility of complementary hydro-photovoltaic operation across the world is revealed. • Three scenarios of the novel operation mode are proposed to satisfy different load demand. • A method for optimally sizing a utility-scale photovoltaic plant is developed by maximizing the net revenue during lifetime. • The influence of complementary hydro-photovoltaic operation upon water resources allocation is investigated. - Abstract: The high variability of solar energy makes utility-scale photovoltaic power generation confront huge challenges to penetrate into power system. In this paper, the complementary hydro-photovoltaic operation is explored, aiming at improving the power quality of photovoltaic and promoting the integration of photovoltaic into the system. First, solar-rich and hydro-rich regions across the world are revealed, which are suitable for implementing the complementary hydro-photovoltaic operation. Then, three practical scenarios of the novel operation mode are proposed for better satisfying different types of load demand. Moreover, a method for optimal sizing of a photovoltaic plant integrated into a hydropower plant is developed by maximizing the net revenue during lifetime. Longyangxia complementary hydro-photovoltaic project, the current world’s largest hydro-photovoltaic power plant, is selected as a case study and its optimal photovoltaic capacities of different scenarios are calculated. Results indicate that hydropower installed capacity and annual solar curtailment rate play crucial roles in the size optimization of a photovoltaic plant and complementary hydro-photovoltaic operation exerts little adverse effect upon the water resources allocation of Longyangxia reservoir. The novel operation mode not only improves the penetration of utility-scale photovoltaic power generation but also can provide a valuable reference for the large-scale utilization of other kinds of renewable energy worldwide.

  1. Hydro power plants, an overview of the current types and technology

    Directory of Open Access Journals (Sweden)

    Tkáč Štefan

    2018-03-01

    Full Text Available Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  2. Computer Security for Commercial Nuclear Power Plants - Literature Review for Korea Hydro Nuclear Power Central Research Institute

    Energy Technology Data Exchange (ETDEWEB)

    Duran, Felicia Angelica [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Security Systems Analysis Dept.; Waymire, Russell L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Security Systems Analysis Dept.

    2013-10-01

    Sandia National Laboratories (SNL) is providing training and consultation activities on security planning and design for the Korea Hydro and Nuclear Power Central Research Institute (KHNPCRI). As part of this effort, SNL performed a literature review on computer security requirements, guidance and best practices that are applicable to an advanced nuclear power plant. This report documents the review of reports generated by SNL and other organizations [U.S. Nuclear Regulatory Commission, Nuclear Energy Institute, and International Atomic Energy Agency] related to protection of information technology resources, primarily digital controls and computer resources and their data networks. Copies of the key documents have also been provided to KHNP-CRI.

  3. Computer Security for Commercial Nuclear Power Plants - Literature Review for Korea Hydro Nuclear Power Central Research Institute

    International Nuclear Information System (INIS)

    Duran, Felicia Angelica; Waymire, Russell L.

    2013-01-01

    Sandia National Laboratories (SNL) is providing training and consultation activities on security planning and design for the Korea Hydro and Nuclear Power Central Research Institute (KHNPCRI). As part of this effort, SNL performed a literature review on computer security requirements, guidance and best practices that are applicable to an advanced nuclear power plant. This report documents the review of reports generated by SNL and other organizations [U.S. Nuclear Regulatory Commission, Nuclear Energy Institute, and International Atomic Energy Agency] related to protection of information technology resources, primarily digital controls and computer resources and their data networks. Copies of the key documents have also been provided to KHNP-CRI.

  4. Potency of Micro Hydro Power Plant Development Use of Kelampuak River Flow Located in Tamblang Village – Buleleng

    Directory of Open Access Journals (Sweden)

    Dewa Ngakan Ketut Putra Negara

    2012-11-01

    Full Text Available Need of electrical energy is increasing along with people population and economic growth. According to PLN data, Bali Province’s electrical consumption is predicted growth 5,6% in average every year. Until year 2007, electrical condition in Bali is categorized critical. If Power Plat in Bali, PLTG Gilimanuk that has power 130 MW is out of system, affecting Bali’s electrical back up is minus. Consecuenlly, it will be extinguishing if there is not adding power plan or new energy supply. This problem needs to be anticipated by use of thermal energy program such as coal, gas and geothermal and use of alternative energy such as solar, wind and ocean energies. Regency of Buleleng is one of Regency in Bali having potency of renewable energy development especially water resource. It has some rivers that have potency to be developed as a Micro Hydro Power Plant (PLTMH. One of them is Kelampuak River which is located in Tamblang Village. As a first step in developing of Micro Hydro Power Plant, it needs to be known water debit and head of the river. For that reason, it needs to be investigated debit and head of Kelampuak River so that it can be predicted the power can be generated.

  5. Short-term optimization of the new Avce pumping plant and three existing hydro power plants on the Soca river in Slovenia

    International Nuclear Information System (INIS)

    Bregar, Zvonko

    2007-01-01

    In the following years a new pumping plant Avce is going to join the existing cascade of three small-regulating-basin hydro power plants (HPPs) on the Soca river in Slovenia. The pumping plant operation will have to be synchronous to the operation of existing plants and vice versa since all four plants depend upon the same inflow and since they all belong to the same generation company that buys and sells electricity to a day-ahead electricity market. The Soca river has torrent alpine characteristics so there are doubts about the operation of the system in frequent dry seasons. As shown in this article, such questions can be effectively solved by first presenting the hydro system of four HPPs under study as a directed graph and then as a mixed integer linear program (MILP): a set of equations and inequations modeling technical issues of HPPs and a target function (the day-ahead market price) modeling the electricity market. A small and simple MILP model called Flores has been used for this study. The MILP approach requires only to specify the problem since the solution is found by using available commercial computer solvers. It can be applied on-line and it can be augmented to include also the transmission constraints, ancillary services, etc. (author)

  6. Short-term optimization of the new Avce pumping plant and three existing hydro power plants on the Soca river in Slovenia

    Energy Technology Data Exchange (ETDEWEB)

    Bregar, Zvonko [Milan Vidmar Electric Power Research Institute, Hajdrihova 2, SI-1000 Ljubljana (Slovenia)

    2007-08-15

    In the following years a new pumping plant Avce is going to join the existing cascade of three small-regulating-basin hydro power plants (HPPs) on the Soca river in Slovenia. The pumping plant operation will have to be synchronous to the operation of existing plants and vice versa since all four plants depend upon the same inflow and since they all belong to the same generation company that buys and sells electricity to a day-ahead electricity market. The Soca river has torrent alpine characteristics so there are doubts about the operation of the system in frequent dry seasons. As shown in this article, such questions can be effectively solved by first presenting the hydro system of four HPPs under study as a directed graph and then as a mixed integer linear program (MILP): a set of equations and inequations modeling technical issues of HPPs and a target function (the day-ahead market price) modeling the electricity market. A small and simple MILP model called Flores has been used for this study. The MILP approach requires only to specify the problem since the solution is found by using available commercial computer solvers. It can be applied on-line and it can be augmented to include also the transmission constraints, ancillary services, etc. (author)

  7. Non-linear multi-objective model for planning water-energy modes of Novosibirsk Hydro Power Plant

    Science.gov (United States)

    Alsova, O. K.; Artamonova, A. V.

    2018-05-01

    This paper presents a non-linear multi-objective model for planning and optimizing of water-energy modes for the Novosibirsk Hydro Power Plant (HPP) operation. There is a very important problem of developing a strategy to improve the scheme of water-power modes and ensure the effective operation of hydropower plants. It is necessary to determine the methods and criteria for the optimal distribution of water resources, to develop a set of models and to apply them to the software implementation of a DSS (decision-support system) for managing Novosibirsk HPP modes. One of the possible versions of the model is presented and investigated in this paper. Experimental study of the model has been carried out with 2017 data and the task of ten-day period planning from April to July (only 12 ten-day periods) was solved.

  8. Optimal bidding in Turkey day ahead electricity market for wind energy and pumped storage hydro power plant

    Directory of Open Access Journals (Sweden)

    Ceyhun Yıldız

    2016-10-01

    Full Text Available In electrical grid; when the demand power increases energy prices increase, when the demand decreases energy prices decrease. For this reason; to increase the total daily income, it is required to shift generations to the hours that high demand power values occurred. Wind Power Plants (WPP have unstable and uncontrollable generation characteristic. For this reason, energy storage systems are needed to shift the generations of WPPs in time scale. In this study, four wind power plants (WPP which are tied to the Turkish interconnected grid and a pumped hydro storage power plant (PSPP that meets the energy storage requirement of these power plants are investigated in Turkey day ahead energy market. An optimization algorithm is developed using linear programming technique to maximize the day ahead market bids of these plants which are going to generate power together. When incomes and generations of the plants that are operated with optimization strategy is analyzed, it is seen that annual income increased by 2.737% compared with WPPs ‘s alone operation and generations are substantially shifted to the high demand power occurred hours.

  9. Bearing Diagnostics of Hydro Power Plants Using Wavelet Packet Transform and a Hidden Markov Model with Orbit Curves

    Directory of Open Access Journals (Sweden)

    Gabriel Pino

    2018-01-01

    Full Text Available The contribution of a medium-sized hydro power plant to the power grid can be either at base load or at peak load. When the latter is the most common operation mode, it increases the start and stop frequency, intensifying the hydro turbine components’ degradation, such as the guide bearings. This happens due to more frequent operation in transient states, which means being outside the service point of the machines’ nominal condition, consisting of speed, flow, and gross head. Such transient state operation increases the runner bearings’ mechanical vibration. The readings are acquired during the runner start-ups and filtered by a DC component mean value and a wavelet packet transform. The filtered series are used to estimate the relationship between the maximum orbit curve displacement and the accumulated operating hours. The estimated equation associated with the ISO 7919-5 vibration standards establishes the sojourn times of the degradation states, sufficient to obtain the transition probability distribution. Thereafter, a triangular probability function is used to determine the observation probability distribution in each state. Both matrices are inputs required by a hidden Markov model aiming to simulate the equipment deterioration process, given a sequence of maximum orbit curve displacements.

  10. Invitro Anti-mycotic Activity of Hydro Alcoholic Extracts of Some Indian Medicinal Plants against Fluconazole Resistant Candida albicans.

    Science.gov (United States)

    Varadarajan, Saranya; Narasimhan, Malathi; Malaisamy, Malaiyandi; Duraipandian, Chamundeeswari

    2015-08-01

    Candidiasis is one of the most common opportunistic infections caused by Candida albicans. Fluconazole is the drug of choice for prevention and management of this condition. However, the emergence of fluconazole resistant candidal strains has become a major concern. Many herbs like fenugreek, cinnamon, papaya, oregano, garlic are rich in phytochemical constituents known to express antimycotic activity. With the available information, the present research study was carried out to assess the invitro anti-mycotic activity of hydro alcoholic extracts of Trigonella foenum-graecum seeds, Cinnamomum verum bark and Carica papaya leaves and seeds against fluconazole resistant Candida albicans. Hydro alcoholic extracts of Trigonella foenum-graecum (seeds), Cinnamomum verum (bark), Carica papaya CO.2 strain (male and female leaves) and Carica papaya CO.2 strain (seeds) were prepared by maceration. The anti-mycotic activity of the prepared extracts against Candida albicans was assessed by agar well diffusion method. Three independent experiments were performed in triplicates and the mean and standard deviation were calculated. Minimum inhibitory concentration was determined. The results of the present study revealed that all the extracts exhibited anti-mycotic activity in a dose dependent manner and minimum inhibitory concentration of all the extracts was found to be 15.62 μg/ml. The results of the present study shed light on the fact that plant extracts could be used not only as an alternate drug for management of fluconazole resistant candidiasis but also explored further for oral cancer prevention as a therapeutic adjunct.

  11. Clinical TVA-based studies: a general review

    Directory of Open Access Journals (Sweden)

    Thomas eHabekost

    2015-03-01

    Full Text Available In combination with whole report and partial report tasks, the Theory of Visual Attention (TVA can be used to estimate individual differences in five basic attentional parameters: The visual processing speed, the storage capacity of visual short-term memory, the perceptual threshold, the efficiency of top-down selectivity, and the spatial bias of attentional weighting. TVA-based assessment has been used in about 30 studies to investigate attentional deficits in a range of neurological and psychiatric conditions: (a neglect and simultanagnosia, (b reading disturbances, (c aging and neurodegenerative diseases, and most recently (d neurodevelopmental disorders. The article introduces TVA based assessment, discusses its methodology and psychometric properties, and reviews the progress made in each of the four research fields. The empirical results demonstrate the general usefulness of TVA-based assessment for many types of clinical neuropsychological research. The method’s most important qualities are cognitive specificity and theoretical grounding, but it is also characterized by good reliability and sensitivity to minor deficits. The review concludes by pointing to promising new areas for clinical TVA-based research.

  12. Application of multi-model control with fuzzy switching to a micro hydro-electrical power plant

    Energy Technology Data Exchange (ETDEWEB)

    Salhi, Issam; Doubabi, Said [Laboratory of Electric Systems and Telecommunications (LEST), Faculty of Sciences and Technologies of Marrakesh, Cadi Ayyad University, BP 549, Av Abdelkarim Elkhattabi, Gueliz, Marrakesh (Morocco); Essounbouli, Najib; Hamzaoui, Abdelaziz [CReSTIC, Reims University, 9, rue de Quebec B.P. 396, F-10026 Troyes cedex (France)

    2010-09-15

    Modelling hydraulic turbine generating systems is not an easy task because they are non-linear and uncertain where the operating points are time varying. One way to overcome this problem is to use Takagi-Sugeno (TS) models, which offer the possibility to apply some tools from linear control theory, whereas those models are composed of linear models connected by a fuzzy activation function. This paper presents an approach to model and control a micro hydro power plant considered as a non-linear system using TS fuzzy systems. A TS fuzzy system with local models is used to obtain a global model of the studied plant. Then, to combine efficiency and simplicity of design, PI controllers are synthesised for each considered operating point to be used as conclusion of an electrical load TS Fuzzy controller. The latter ensures the global stability and desired performance despite the change of operating point. The proposed approach (model and controller) is tested on a laboratory prototype, where the obtained results show their efficiency and their capability to ensure good performance despite the non-linear nature of the plant. (author)

  13. Dynamic modeling, simulation and control design of an advanced micro-hydro power plant for distributed generation applications

    Energy Technology Data Exchange (ETDEWEB)

    Marquez, J.L. [Instituto de Energia Electrica, Universidad Nacional de San Juan, Av. Libertador San Martin Oeste 1109, J5400ARL San Juan (Argentina); Molina, M.G. [CONICET, Instituto de Energia Electrica, Universidad Nacional de San Juan, Av. Libertador San Martin Oeste 1109, J5400ARL San Juan (Argentina); Pacas, J.M. [Institut fuer Leistungselektronik und Elektrische Antriebe, Universitaet Siegen, Fachbereich 12 Hoelderlinstr 3, D 57068 Siegen (Germany)

    2010-06-15

    A small-scale hydropower station is usually a run-of-river plant that uses a fixed speed drive with mechanical regulation of the turbine water flow rate for controlling the active power generation. This design enables to reach high efficiency over a wide range of water flows but using a complex operating mechanism, which is in consequence expensive and tend to be more affordable for large systems. This paper proposes an advanced structure of a micro-hydro power plant (MHPP) based on a smaller, lighter, more robust and more efficient higher-speed turbine. The suggested design is much simpler and eliminates all mechanical adjustments through a novel electronic power conditioning system for connection to the electric grid. In this way, it allows obtaining higher reliability and lower cost of the power plant. A full detailed model of the MHPP is derived and a new three-level control scheme is designed. The dynamic performance of the proposed MHPP is validated through digital simulations and employing a small-scale experimental set-up. (author)

  14. Hydro-thermal power flow scheduling accounting for head variations

    International Nuclear Information System (INIS)

    El-Hawary, M.E.; Ravindranath, K.M.

    1992-01-01

    In this paper the authors treat the problem of optimal economic operation of hydrothermal electric power systems with variable head hydro plants employing the power flow equations to represent the network. Newton's method is used to solve the problem for a number of test systems. A comparison with solutions with fixed head is presented. In general the optimal schedule requires higher slack bus and thermal power generation and cost in the case of variable head hydro plant than that required by the fixed head hydro plant in all demand periods. Correspondingly, the hydro generation is less in the case of variable head hydro plant compared to fixed head hydro plant. A negligible difference in voltage magnitudes in all the time intervals, but it is observed that slightly higher voltages occur in the case of the fixed head hydro plant. Higher power and energy losses occur in the case of variable head hydro plants compared to the fixed head hydro plants

  15. Short-term hydro generation scheduling of Three Gorges–Gezhouba cascaded hydropower plants using hybrid MACS-ADE approach

    International Nuclear Information System (INIS)

    Mo, Li; Lu, Peng; Wang, Chao; Zhou, Jianzhong

    2013-01-01

    Highlights: • MACS and ADE algorithms are hybridized as MACS-ADE method for solving STHGS problem. • An adaptive mutation is integrated into the proposed algorithm to avoid premature convergence. • MACS and ADE are run in parallel in search of better solution. • Several effective heuristic strategies are designed for dealing with various constraints of STHGS problem. - Abstract: Short-term hydro generation scheduling (STHGS) aims at determining optimal hydro generation scheduling to obtain minimum water consumption for one day or week while meeting various system constraints. In this paper, the STHGS problem is decomposed into two sub-problems: (i) unit commitment (UC) sub-problem; (ii) economic load dispatch (ELD) sub-problem. Then, we present a hybrid algorithm based on multi ant colony system (MACS) and differential evolution (DE) for solving the STHGS problem. First, MACS is used for dealing with UC sub-problem. A set of cooperating ant colonies cooperate to choose the unit state over the scheduled time horizon. Then, the adaptive differential evolution (ADE) is used to solve ELD sub-problem. MACS and ADE are run in parallel with adjusting their solutions in search of a better solution. Meanwhile, local and global pheromone updating rules in MACS and adaptive dynamic parameter adjusting strategy in DE are applied for enhancing the search ability of MACS-ADE. Finally, the proposed method is implemented to solve STHGS problem of Three Gorges–Gezhouba cascaded hydropower plants to verify the feasibility and effectiveness. Compared with other established methods, the simulation results reveal that the proposed MACS-ADE approach has the best convergence property, computational efficiency with less water consumption

  16. TVA on competition in the coal and uranium industries

    International Nuclear Information System (INIS)

    Norman, D.; Guerrieri, U.A.

    1979-01-01

    A critique of the Tennessee Valley Authority (TVA) review of competition in the two industries reviews several versions and updates of the report and compares them with the Wilson report. The authors find inconsistencies and errors in TVA's arguments and evidence. They argue that the reports do not demonstrate a cause and effect relationship between oil company entry into coal and uranium markets and rising prices and concentration. Instead the reports merely assert such a relationship, then use their assertion as the sole basis for policy recommendations. 1 figure, 6 tables

  17. Development of a native plant prescription for urban hydro rights of way

    Energy Technology Data Exchange (ETDEWEB)

    Suffling, R.; Lamb, L.; Murphy, S. [Waterloo Univ., Waterloo, ON (Canada)

    1998-12-31

    Ontario Hydro commissioned a study to determine how to control tall woody vegetation on rights-of-way since trees cause power leakage and make maintenance difficult. The objective was to find an environmentally benign solution to the problem. The study assessed the feasibility of using seven different herbaceous species of prairie affinity on rights-of-way in urban areas. Tallgrass prairie has long been known to inhibit invasion of woody species. A total of 64 plots were prepared and sown using four different methods. Effectiveness of the program was assessed by collating the abundance of the seven sown species for each of the four methods and by soil analysis to measure changes in the population of viable seeds in the soil. Results showed that the most effective strategy to establish the widest variety of species was to apply a fertilizer (glyphosate) in the Fall, and sowing a mix of species soon after, followed by rototilling in the spring and sowing a different mix. Seedbank observations proved useful in showing huge numbers of viable seeds surviving after long periods (40 years) without soil disturbance,. 3 refs., 1 tab., 2 figs.

  18. Development of a native plant prescription for urban hydro rights of way

    International Nuclear Information System (INIS)

    Suffling, R.; Lamb, L.; Murphy, S.

    1998-01-01

    Ontario Hydro commissioned a study to determine how to control tall woody vegetation on rights-of-way since trees cause power leakage and make maintenance difficult. The objective was to find an environmentally benign solution to the problem. The study assessed the feasibility of using seven different herbaceous species of prairie affinity on rights-of-way in urban areas. Tallgrass prairie has long been known to inhibit invasion of woody species. A total of 64 plots were prepared and sown using four different methods. Effectiveness of the program was assessed by collating the abundance of the seven sown species for each of the four methods and by soil analysis to measure changes in the population of viable seeds in the soil. Results showed that the most effective strategy to establish the widest variety of species was to apply a fertilizer (glyphosate) in the Fall, and sowing a mix of species soon after, followed by rototilling in the spring and sowing a different mix. Seedbank observations proved useful in showing huge numbers of viable seeds surviving after long periods (40 years) without soil disturbance,. 3 refs., 1 tab., 2 figs

  19. The hydro digest

    Energy Technology Data Exchange (ETDEWEB)

    Scheil, Hermann [Itaipu Mondig, Power Generation Group (KWU), Siemens AG, Erlangen (Germany)

    2000-12-01

    Digest WK is an analysis and diagnostics system for turbine generators in large hydroelectric plant: it was developed from the Digest system which has been used in steam turbine plants for many years. The system is in use at the world's biggest hydro plant in Itaipu Binacional between Paraguay and Brazil. The system is described under the sub-headings of (a) monitoring concept; (b) the Digest WK system; (c) vibration monitoring; (d) generator temperature analysis and (e) outlook.

  20. Thermionic vacuum arc (TVA) technique for magnesium thin film deposition

    Energy Technology Data Exchange (ETDEWEB)

    Balbag, M.Z., E-mail: zbalbag@ogu.edu.t [Eskisehir Osmangazi University, Education Faculty, Primary Education, Meselik Campus, Eskisehir 26480 (Turkey); Pat, S.; Ozkan, M.; Ekem, N. [Eskisehir Osmangazi University, Art and Science Faculty, Physics Department, Eskisehir 26480 (Turkey); Musa, G. [Ovidius University, Physics Department, Constanta (Romania)

    2010-08-15

    In this study, magnesium thin films were deposited on glass substrate by the Thermionic Vacuum Arc (TVA) technique for the first time. We present a different technique for deposition of high-quality magnesium thin films. By means of this technique, the production of films is achieved by condensing the plasma of anode material generated using Thermionic Vacuum Arc (TVA) under high vacuum conditions onto the surface to be coated. The crystal orientation and morphology of the deposited films were investigated by using XRD, EDX, SEM and AFM. The aim of this study is to search the use of TVA technique to coat magnesium thin films and to determine some of the physical properties of the films generated. Furthermore, this study will contribute to the scientific studies which search the thin films of magnesium or the compounds containing magnesium. In future, this study will be preliminary work to entirely produce magnesium diboride (MgB{sub 2}) superconductor thin film with the TVA technique.

  1. Integrated operation of hydro thermal system

    International Nuclear Information System (INIS)

    Nanthakumar, J.

    1994-01-01

    Long-term power system expansion planning studies are carried out to meet the electricity requirement in the future. Prior to the expansion planning studies, it is essential to know the energy potential of the existing generating system, especially the hydro power plants. Detailed hydro thermal stimulation studies of the integrated system is therefore carried out to determine the best way to maximise the hydro energy of the existing and committed plants. The results of the integrated system simulated model are stored in numerous files and are available for retrieval. Most important output used for expansion analysis is the energy production of each hydro plant. The annual hydro energy potential of the total hydro system of Sri Lanka for the hydrological year from 1949 to 1988 is given. Hydro condition data with different probability levels are also indicated

  2. Electrification Using Decentralized Micro-Hydro Power Plants in Northern Afghanistan

    Directory of Open Access Journals (Sweden)

    Ramchandra Bhandari

    2015-03-01

    In order to identify the operational status of installed MHP plants in four North-eastern provinces (i.e. Badakhshan, Baghlan, Balkh and Takhar and to assess their socio-economic impacts, an extensive field monitoring had been carried out. The major parameters studied were spatial distribution of MHP plants, investment costs, operational models, end user electricity tariffs, productive use of electricity, community satisfaction, etc. Altogether, 421 MHP installations (about 11 MW installed capacity were visited. The outcomes obtained from those surveys are presented in detail in this paper.

  3. An Extended VIKOR-Based Approach for Pumped Hydro Energy Storage Plant Site Selection with Heterogeneous Information

    Directory of Open Access Journals (Sweden)

    Yunna Wu

    2017-08-01

    Full Text Available The selection of a desirable site for constructing a pumped hydro energy storage plant (PHESP plays a vital important role in the whole life cycle. However, little research has been done on the site selection of PHESP, which affects the rapid development of PHESP. Therefore, this paper aims to select the most ideal PHESP site from numerous candidate alternatives using the multi-criteria decision-making (MCDM technique. Firstly, a comprehensive evaluation criteria system is established for the first time. Then, considering quantitative and qualitative criteria coexist in this system, multiple types of representations, including crisp numerical values (CNVs, triangular intuitionistic fuzzy numbers (TIFNs, and 2-dimension uncertain linguistic variables (2DULVs, are employed to deal with heterogeneous criteria information. To determine the weight of criteria and fully take the preference of the decision makers (DMs into account, the analytic hierarchy process (AHP method is applied for criteria weighting. After that, an extended Vlsekriterijumska Optimizacija I Kompromisno Resenje (VIKOR method is utilized to provide compromise solutions for the PHESP site considering such heterogeneous information. At last, the proposed model is then applied in a case study of Zhejiang province, China to illustrate its practicality and efficiency. The result shows the Changlongshan should be selected as the optimal PHESP.

  4. Ontario Hydro Research Division annual report 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The Research Division of Ontario Hydro conducts research in the fields of chemistry, civil engineering, electrical engineering, mechanical engineering, metallurgy, and operations. Much of the research has a bearing on the safe, environmentally benign operation of Ontario Hydro's nuclear power plants. Particular emphasis has been placed on nuclear plant component aging and plant life assurance

  5. Experimental investigation of am measures and effect of hydro-accumulator initial pressure for VVER-440 plants

    International Nuclear Information System (INIS)

    Ivan Toth; Gyorgy Ezsol; Attila Guba; Laszlo Perneczky

    2005-01-01

    Full text of publication follows: A series of experiments were performed at the PMK-2 test facility within the IMPAM-VVER project of the EU 5. Framework Programme. The PMK-2 integral-type facility is a scaled down model of the Paks NPP with a volume and power scaling of 1:2070. Transients can be started from nominal operating conditions. The ratio of elevations is 1:1 except for the lower plenum and pressurizer. The six loops of the plant are modelled by a single active loop. The main objective of the project was to address different problems encountered during the development of EOPs for the Paks NPP in Hungary. Two of the six PMK tests addressed the investigation of starting criteria for primary and secondary bleed during a small break LOCA without HPIS: - a 'base case', with bleed actions following the plant procedures; - a run with secondary and primary bleed started as early as possible. Further two tests investigated the effect of nominal and reduced initial hydro-accumulator pressures on the process, the main question being, whether the starting pressure of the LPIS can be reached without significant overheating of the fuel. These latter were run from lowered initial system pressure in order to be compared to similar tests performed in the project at the PACTEL facility. The two first tests confirmed tendencies shown by earlier plant calculations that neither the secondary nor the primary bleed is effective enough to reduce the pressure, even if their earliest possible actuation is envisaged. As a consequence, low pressure injection could not be started in time to avoid severe fuel rod heat-up and the core power had to be cut in both tests. Comparing the results of tests 3 and 4 the beneficial effect of lowered HA pressure could be analysed. Although heater rod temperatures started to rise also in this test after hydro-accumulators were empty, the secondary and primary bleed actions resulted in the primary pressure dropping to 0.7 MPa and LPIS injection

  6. Hydro turbines: An introduction

    International Nuclear Information System (INIS)

    Gordon, J.L.

    1993-01-01

    The various types of hydraulic turbines currently used in hydroelectric power plants are described. The descriptions are intended for use by non-engineers who are concerned with fish passage and fish mortality at a hydro power facility. Terminology used in the hydro industry is explained. Since the extent of cavitation is one of the factors affecting mortality rates of fish passing through hydraulic turbines, an equation is introduced which measures the extent of cavitation likely to be experienced in a turbine. An example of how the cavitation index can be calculated is provided for two typical power plants. The relation between certain parameters of power plant operation and the extent of cavitation, and therefore of fish mortality, is illustrated. 2 refs., 14 figs

  7. THREE-DIMENSIONAL GEOFILTRATIONAL MODEL OF THE ROGUN HYDRO POWER PLANT CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Khokhotva Sergey Nikolaevich

    2017-05-01

    Full Text Available The article deals with technique of creation and results of calculations of the three-dimensional geofiltrational model of the Rogun HPP construction site. When performing works on creation of the Rogun HPP three-dimensional geofiltration model, geological and hydrogeological conditions of the Rogun HPP construction site were analyzed. They showed that the construction site consists mostly of fractured rocks of various weathering degrees. In terms of preservation, four preservation zones were identified in the rock mass. These zones define the features of hydrogeological conditions that have emerged in the area of construction. Calculation results illustrated the absence of seepage areas on the lower slope of dam; this is the indication of normal operation of the dam impervious circuit. The drainage system of the underground hydropower plant has a high efficiency. Operation of the drainage galleries complex leads to a significant reduction of piezometric pressure on roofs of the machine and transformer halls. Above the underground structures a completely drained area is formed. Completed forecast calculations on geofiltration model of the Rogun hydropower plant determine the hydrostatic pressure and piezometric pressure at any point of the modeled area. These data can be used as loads while designing of lining of underground workings.

  8. Managing a reservoir-based hydro-energy plant: building understanding in the buy and sell decisions in a changing environment

    International Nuclear Information System (INIS)

    Ackere, A. van; Ruud, Morten; Davidsen, Paal

    2005-01-01

    This paper describes a modelling process at a Norwegian chemical producer, who owns 20% of a reservoir based hydro-energy plant. While the initial objective was to increase the profitability of the energy plant (in particular by an improved understanding of buying and selling decisions and a reconciliation of the managerial and engineering points of view in the context of a liberalised energy market) the process resulted in the company's decision to refocus on its core-business. The process illustrates how a modelling process can lead to a fundamental re framing of the issue, resulting in major change for the company

  9. Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' hydroelectric system into the power system of the Republic of Macedonia

    International Nuclear Information System (INIS)

    Rumenova, Evica; Naumoski, Kliment

    2001-01-01

    At the and of 1998, a study on conditions and possibilities of the 'Shara' hydroelectric system construction was prepared. The study considers an interesting idea for building up three reversible power plants. From electricity point of view the study emphasizes several significant issues that require comprehensive analyses in order to define the conditions and possibilities for their development. This paper attempts to give an overview of one of this issues: Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' - system into the power supply system of Republic of Macedonia. (Original)

  10. Evaluating a biomass resource: The TVA region-wide biomass resource assessment model

    International Nuclear Information System (INIS)

    Downing, M.; Graham, R.L.

    1993-01-01

    Wood is an alterative fuel for electric power generation at coal-fired plants in the Tennessee Valley Authority (TVA) region. Short rotation wood energy crops (SRWC) could provide a source of this woody biomass. However, the economic and supply structures of SRWC markets have not been established. Establishing the likely price and supply of SRWC biomass in a region is a complex task because biomass is not an established commodity as are oil, natural gas and coal. In this study we project the cost and supply of short-rotation woody biomass for the TVA region -- a 276 county area that includes all of Tennessee and portions of 10 contiguous states in the southeastern United States. Projected prices and quantities of SRWC are assumed to be a function of the amount and quality of crop and pasture land available in a region. expected SRWC yields and production costs on differing soils and land types, and the profit that could be obtained from current conventional crop production on these same lands. Results include the supply curve of SRWC biomass that is projected to be available from the entire region, the amount and location of crop and pasture land that would be used, and the conventional agricultural crops that would be displaced as a function of SRWC production. Finally, we show the results of sensitivity analysis on the projected cost and supply of SRWC biomass. In particular, we examine the separate impacts of varying SRWC production yields

  11. O etici poslovanja i poduzetništva "business ethics"

    OpenAIRE

    Bozanić, Anton

    1998-01-01

    O etici poslovanja i poduzetništva ili gospodarstva i poduzetništva, opće poznatoj kao "business ethics", mnogo se danas raspravlja i piše, posebno u visoko razvijenijim zemljama, ali i svim ostalim koje žele uhvatiti korak sa svjetskim tržištem i vrlo dinamičnim izazovima konkurencije, ponude i potražnje. Sve više Jača svijest kako personalna etika - toliko važna u svakidašnjem ljudskom životu - nije sama po sebi dostatna kod donošenja etičkih odluka, Jer su u suvremenom gospodarskom...

  12. TVA experience in BWR reload design and licensing

    International Nuclear Information System (INIS)

    Robertson, J.D.

    1986-01-01

    TVA has developed and implemented the capability to perform BWR reload core design and licensing analyses. The advantages accruing from this capability include the tangible cost-savings from performing reload analyses in-house. Also, ''intangible'' benefits such as increased operating flexibility and the ability to accommodate multivendor fuel designs have been demonstrated. The major disadvantage with performing in-house analyses is the cost associated with development and maintenance of the analytical methods and staff expertise

  13. Sealing of rock joints by induced calcite precipitation. A case study from Bergeforsen hydro power plant

    International Nuclear Information System (INIS)

    Hakami, E.; Qvarfort, U.; Ekstav, A.

    1991-01-01

    The possibilities of sealing rock fractures by injecting water saturated with calcite solution, and hereby inducing a calcite precipitation inside the fracture, is investigated. The way of reaction and the amount of calcite precipitation will depend on the saturation of calcium carbonate in the water, the temperature, the pH and the CO 2 -pressure. There is experience of lime-saturated water injection in the rock foundation below the dam at Bergeforsens power plant (1955-1968). It was observed that the consumption of injected lime water decreased with time. A possible reason to the decrease in lime water consumption is that calcite has precipitated such that the permeability of the rock in general is lowered. Another explanation to this could be that calcite precipitation is concentrated to the fractures surrounding the injection holes, thus preventing the lime water from penetrating further into the rock. It is recommended that further studies of the fracture fillings in drill cores from Bergeforsen is performed. The aim of such study should be to determine the extent of induced calcite precipitation and to investigate its chemical and physical properties. (authors)

  14. Vaksvikelva small hydro

    OpenAIRE

    Loe, Daniel Aarset

    2017-01-01

    Norway is in constant need of renewable energy, and hydroelectric power is still the main source. A great future potential can be found in countless small rivers scattered across the country, which could be developed through small hydro projects. In the process of converting mechanical movement - flowing water - into electric energy, about 5% turns into heat. From a power plant with an annual production of 15 GWh, this means energy enough to heat approximately 30 households is lost. In my pro...

  15. New markets for small-scale hydro

    International Nuclear Information System (INIS)

    Maurer, E.A.

    1997-01-01

    The market for small and medium sized hydro-electric power plant is more attractive than ever. The boom in Europe has increasingly spread to the emerging countries, and here too small hydro plays an important ecological role. In addition to new plant rehabilitation of 'historical' plant is now a major factor. The last few years have seen a market shift from single machine components to complete plant and systems, requiring a strategy re-think on the part of larger companies. Following the influx of private capital into the power industry, business conditions have also undergone a thorough transformation. In place of 'fast money', hydro power offers the prospect of earning longer-term, sustainable money'. The term small-scale hydro-electric power (or simply 'small hydro') is used slightly differently depending on the country and market. Here, it is used to denote plant with turbines up to 10 MW. (Author)

  16. 18 CFR 1304.208 - Shoreline stabilization on TVA-owned residential access shoreland.

    Science.gov (United States)

    2010-04-01

    ... of gabions and riprap to stabilize eroded shorelines. (1) The riprap material must be quarry-run stone, natural stone, or other material approved by TVA. (2) Rubber tires, concrete rubble, or other... concrete, gabions, or other materials acceptable to TVA. Railroad ties, rubber tires, broken concrete...

  17. Small-scale hydro-power plant in Quinto - Preliminary project; Progetto minicentrale idroelettrica, Ri Secco - Quinto. Programma piccole centrali idrauliche. Progetto di massima

    Energy Technology Data Exchange (ETDEWEB)

    Dotti, R. [Reali e Guscetti SA, Ambri (Switzerland); Rosselli, P. [Celio Engineering SA, Ambri (Switzerland)

    2009-06-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the alpine stream 'Ri Secco' in the municipality of Quinto, southern Switzerland. The Ri Secco partly flows in a steep canyon. The elevation difference of 810 or 620 m (depending on the location of the water deviation from the stream) is favorable to the installation of a small-scale high-head power plant. The report presents details on the hydrological data and the dimensioning of the installation. Several variants are considered, which also include two possible penstock diameters for each weir location. The electricity production expected is discussed, as is the economic viability of the project.

  18. Ontario Hydro annual report 1975

    International Nuclear Information System (INIS)

    A financial report and statistics on Ontario energy demand are presented. Efforts to secure a reliable supply of coal and uranium are described. Ontario Hydro's expansion is now controlled by capital availability and not power demand, and this has affected 11 construction projects, including heavy water plants and nuclear generating stations. (E.C.B.)

  19. 18 CFR 1314.4 - Law governing the rights and obligations of TVA and Reserve Banks; law governing the rights of...

    Science.gov (United States)

    2010-04-01

    ... rights and obligations of TVA and Reserve Banks; law governing the rights of any Person against TVA and... FEDERAL RESERVE BANKS § 1314.4 Law governing the rights and obligations of TVA and Reserve Banks; law governing the rights of any Person against TVA and Reserve Banks; law governing other interests. (a) Except...

  20. Increased installation in existing hydro power plants. Potentials and costs; Oekt installasjon i eksisterende kraftverk. Potensial og kostnader

    Energy Technology Data Exchange (ETDEWEB)

    Stensby, Kjell Erik (ed.)

    2011-06-15

    This report seeks to highlight the costs associated with increased installed capacity of existing hydropower plants. Five selected power plant is further studied. Furthermore, given an overview of the technical possibilities of power expansions in Norway. (AG)

  1. Modeling invasive alien plant species in river systems : Interaction with native ecosystem engineers and effects on hydro-morphodynamic processes

    NARCIS (Netherlands)

    van Oorschot, M.; Kleinhans, M. G.; Geerling, G.W.; Egger, G.; Leuven, R.S.E.W.; Middelkoop, H.

    2017-01-01

    Invasive alien plant species negatively impact native plant communities by out-competing species or changing abiotic and biotic conditions in their introduced range. River systems are especially vulnerable to biological invasions, because waterways can function as invasion corridors. Understanding

  2. Campbell Creek TVA 2010 First Year Performance Report July 1, 2009 August 31, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Christian, Jeffrey E [ORNL; Gehl, Anthony C [ORNL; Boudreaux, Philip R [ORNL; New, Joshua Ryan [ORNL

    2010-10-01

    This research project was initiated by TVA in March 2008 and encompasses three houses that are of similar size, design and located within the same community - Campbell Creek, Farragut TN with simulated occupancy. This report covers the performance period from July 1, 2009 to August 31, 2010. It is the intent of TVA that this Valley Data will inform electric utilities future residential retrofit incentive program.

  3. TVA-Based Assessment of Visual Attention Using Line-Drawings of Fruits and Vegetables

    Directory of Open Access Journals (Sweden)

    Tianlu Wang

    2018-02-01

    Full Text Available Visuospatial attention and short-term memory allow us to prioritize, select, and briefly maintain part of the visual information that reaches our senses. These cognitive abilities are quantitatively accounted for by Bundesen’s theory of visual attention (TVA; Bundesen, 1990. Previous studies have suggested that TVA-based assessments are sensitive to inter-individual differences in spatial bias, visual short-term memory capacity, top-down control, and processing speed in healthy volunteers as well as in patients with various neurological and psychiatric conditions. However, most neuropsychological assessments of attention and executive functions, including TVA-based assessment, make use of alphanumeric stimuli and/or are performed verbally, which can pose difficulties for individuals who have troubles processing letters or numbers. Here we examined the reliability of TVA-based assessments when stimuli are used that are not alphanumeric, but instead based on line-drawings of fruits and vegetables. We compared five TVA parameters quantifying the aforementioned cognitive abilities, obtained by modeling accuracy data on a whole/partial report paradigm using conventional alphabet stimuli versus the food stimuli. Significant correlations were found for all TVA parameters, indicating a high parallel-form reliability. Split-half correlations assessing internal reliability, and correlations between predicted and observed data assessing goodness-of-fit were both significant. Our results provide an indication that line-drawings of fruits and vegetables can be used for a reliable assessment of attention and short-term memory.

  4. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    McCredie, J.

    1984-01-01

    This report briefly describes Ontario Hydro's nuclear program, examining the design and construction status, and the future from Ontario Hydro's perspective. Ontario Hydro relies heavily on nuclear power. Nuclear fuel was responsible for approximately 34% of Ontario Hydro's energy production in 1983. The nuclear proportion was supplied by twelve operating units located: NPD, Douglas Point, Pickering A and B. It is expected that by approximately 1992, 65% of the total energy needs will be generated through nuclear power

  5. Repowering hydro

    International Nuclear Information System (INIS)

    Lagassa, G.

    1992-01-01

    This article examines the current market for equipment and services to retrofit existing hydroelectric plants with modern equipment and evaluating, upgrading, or rehabilitating dams. The topics of the article include the current markets, the consulting engineer's role, the impetus for the market, and the future of the market for site upgrading and equipment refurbishing

  6. Small hydro: Policy and potential in Spain

    International Nuclear Information System (INIS)

    Gutierrez, C.

    2001-01-01

    In Spain, the benefits of small-scale (less than 10 MW) hydro are apparently rarely appreciated and there is little support from European institutions. The article suggests that small hydro technology can make a significant contribution to the country's energy requirements and create employment, provided certain obstacles can be removed. Data on the number of small hydros in Spain, and of recent installations are given; the share of hydro in Spain's total energy production is 2.5%. The low environmental impact of hydro is extolled, and the conclusions of a recent study of 'environmental impacts of the production of electricity' are listed. There are said to be unreasonable administrative obstacles; for example, it is more difficult to obtain permission to refurbish a 100 kW hydro plant in Castilla y Leon than it is to install a 30,000 kW gas plant. Some details relating to the affect of hydro on aquatic ecosystems, noise levels, and water quality, are given

  7. Home and away with Norwegian hydro

    International Nuclear Information System (INIS)

    Jones, Simon

    2000-01-01

    Evidence of Norway's position as a world leader in terms of design and construction of hydroelectric power plant, and its position as the biggest producer of hydro in Europe, is presented. There is still some 30 TWh of hydro available for development in Norway. Statkraft is the country's biggest hydro generator: it owns and operates 54 hydro plants and has shares in a further 30. Statkraft's research has shown that there is still a large market for renewables in Europe and believes that householders are prepared to pay a premium for green energy. Statkraft trades energy with Denmark and Sweden and is believed to be planning further growth overseas. The new millennium is set to bring major changes in Norway's power industry: Hafslund and Elkem have already agreed to merge to create the country's biggest privately-owned power group

  8. The Nothuesli small hydro project

    International Nuclear Information System (INIS)

    Balachandran, S.; Jorde, K.

    2008-01-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  9. Small-scale hydro-power plant in Anzonico - Preliminary project; Progetto microcentrale idroelettrica, Anzonico. Programma Centrali idrauliche. Progetto di massima

    Energy Technology Data Exchange (ETDEWEB)

    Dotti, R. [Reali e Guscetti SA, Ambri (Switzerland); Rosselli, P. [Celio Engineering SA, Ambri (Switzerland)

    2009-01-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant in the municipality of Anzonico, southern Switzerland. The water of a small alpine stream is to be used for power generation and vineyard irrigation as well as for the creation of an additional water resource for fire fighting in this sensitive region. The report is foreseen to support the request for a water usage concession to the authorities of the Canton of Ticino. It presents details on the hydrological data for the river and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as is the removal of river sediment. The electricity production expected is discussed, as is the economic viability of the project. Synergies exist with the local electricity utility that will renew and improve its power distribution and telecommunication system when the penstock will be mounted in the underground.

  10. Brigham City Hydro Generation Project

    Energy Technology Data Exchange (ETDEWEB)

    Ammons, Tom B. [Energy Conservation Specialist, Port Ewen, NY (United States)

    2015-10-31

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and

  11. TVA nuclear power: Management of the nuclear program through personal services contracts

    International Nuclear Information System (INIS)

    1987-01-01

    Mr. Steven White, a retired admiral, is serving as manager of the TVA Office of Nuclear Power. GAO previously concluded that Mr. White's retention under contractual arrangements constituted the improper use of a personal services contract and represented a circumvention of the statutory ceiling on salary payments to TVA employees. This report finds that Mr. White's rate of pay is within the range of the salaries paid by a sample of nonfederal utilities to their top executives and is over two and a half times the average salary paid to executives who hold positions which appear to have responsibility for managing the utilities' power or nuclear power operations. GAO also found that (1) TVA's Office of Nuclear Power has employed an additional 25 persons since 1986 under arrangements similar to the employing arrangements of Mr. White and (2) TVA's Nuclear Safety Review staff no longer reports directly to the TVA Board of Directors and General Manager. It has relocated from Knoxville, Tennessee to Chattanooga, Tennessee

  12. Outlining the project of the new RADAG hydro power plant; Projektueberblick ueber den Neubau des RADAG-Wehrkraftwerkes

    Energy Technology Data Exchange (ETDEWEB)

    Rost, Manfred; Schlageter, Guenter [Rheinkraftwerk Albbruck-Dogern AG, Laufenburg-Rhina (Germany)

    2010-07-01

    After expiration of the license in 2003 the Swiss Federal Council and the Freiburg District Government issued a new operating license for another 70 years. This new license first of all allows RADAG to continue operation of the existing power plant, situated at the end of a 3,8 km long channel. At the same time, however, it requires the company to commission a new plant besides the existing barrage by the end of 2012, which will increase the present day output from 528 GWh up to 650 GWh per year. RADAG immediately got down working on the project of what would be one of the largest run-of-river power stations in Germany. The new license provides and increase of the total turbine water flow from originally 1 100 m{sup 3}/s up to 1 400 m{sup 3}/s. The new power plant contains one large Kaplan turbine with an installed total wattage of 28 MW, thus increasing the overall wattage up to 108 MW. The total project costs of the new plant amount to about 68 Mio Euro (price level as per 2007), including 4 Mio Euro for environmental measures. (orig.)

  13. Construction of a new hydro power plant at Albbruck-Dogern; Neubau des Wehrkraftwerkes Albbruck-Dogern

    Energy Technology Data Exchange (ETDEWEB)

    Schlageter, G. [Rheinkraftwerk Albbruck-Dogern AG, Albbruck (Germany)

    2006-07-01

    After expiration of the authorization in 2003 the German and the Swiss authorities issued a new operating licence for another 70 years. This new licence first of all allows RADAG to continue operation of the existing power plant. At the same time, however, it requires the company to commission a new plant by the end of 2009 (latest by 2012), which will increase the present day output for more than 15%. The new licence provides an increase of turbine water flow from currently 1100 m{sup 3}/s up to 1400 m{sup 3}/s. The additional power plant will have one large Kaplan turbine (bulb-type), with an installed total power of 24 MW, having a runner diameter of about 6 meters. Using to days head at the existing weir, which is about 8,75 meters, the turbine will discharge up to 300 m{sup 3}/s. The total project costs of the additional plant amount to about 55 Mio. Euro (price level 2002). The civil works will start at the end of 2006. (orig.)

  14. Hydro-economic performances of streamflow withdrawal strategies: the case of small run-of-river power plants

    Science.gov (United States)

    Basso, Stefano; Lazzaro, Gianluca; Schirmer, Mario; Botter, Gianluca

    2014-05-01

    River flows withdrawals to supply small run-of-river hydropower plants have been increasing significantly in recent years - particularly in the Alpine area - as a consequence of public incentives aimed at enhancing energy production from renewable sources. This growth further raised the anthropic pressure in areas traditionally characterized by an intense exploitation of water resources, thereby triggering social conflicts among local communities, hydropower investors and public authorities. This brought to the attention of scientists and population the urgency for novel and quantitative tools for assessing the hydrologic impact of these type of plants, and trading between economic interests and ecologic concerns. In this contribution we propose an analytical framework that allows for the estimate of the streamflow availability for hydropower production and the selection of the run-of-river plant capacity, as well as the assessment of the related profitability and environmental impacts. The method highlights the key role of the streamflow variability in the design process, by showing the significance control of the coefficient of variation of daily flows on the duration of the optimal capacity of small run-of-river plants. Moreover, the analysis evidences a gap between energy and economic optimizations, which may result in the under-exploitation of the available hydropower potential at large scales. The disturbances to the natural flow regime produced between the intake and the outflow of run-of-river power plants are also estimated within the proposed framework. The altered hydrologic regime, described through the probability distribution and the correlation function of streamflows, is analytically expressed as a function of the natural regime for different management strategies. The deviations from pristine conditions of a set of hydrologic statistics are used, jointly with an economic index, to compare environmental and economic outcomes of alternative plant

  15. Verification of a GIS-based system for identification of potential hydro power plant sites in Uganda

    OpenAIRE

    Gimbo, Florence

    2015-01-01

    Hydropower makes and is expected to continue to make a significant contribution to meeting the electricity demand in many countries. The information on hydropower potential is many places is often incomplete. A GIS based tool is under development is expected to help in quickly identifying possible hydropower plant locations over a large area in a short time. This study is aimed at evaluating how well this GIS tool is able to estimate the hydropower potential from the runoff maps and terrain/e...

  16. Ontario Hydro's DSP update

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Ontario Hydro's Demand/Supply Plan (DSP), the 25 year plan which was submitted in December 1989, is currently being reviewed by the Environmental Assessment Board (EAB). Since 1989 there have been several changes which have led Ontario Hydro to update the original Demand/Supply Plan. This information sheet gives a quick overview of what has changed and how Ontario Hydro is adapting to that change

  17. Adapting the Theory of Visual Attention (TVA) to model auditory attention

    DEFF Research Database (Denmark)

    Roberts, Katherine L.; Andersen, Tobias; Kyllingsbæk, Søren

    Mathematical and computational models have provided useful insights into normal and impaired visual attention, but less progress has been made in modelling auditory attention. We are developing a Theory of Auditory Attention (TAA), based on an influential visual model, the Theory of Visual...... Attention (TVA). We report that TVA provides a good fit to auditory data when the stimuli are closely matched to those used in visual studies. In the basic visual TVA task, participants view a brief display of letters and are asked to report either all of the letters (whole report) or a subset of letters (e...... the auditory data, producing good estimates of the rate at which information is encoded (C), the minimum exposure duration required for processing to begin (t0), and the relative attentional weight to targets versus distractors (α). Future work will address the issue of target-distractor confusion, and extend...

  18. Visual attention capacity: a review of TVA-based patient studies.

    Science.gov (United States)

    Habekost, Thomas; Starrfelt, Randi

    2009-02-01

    Psychophysical studies have identified two distinct limitations of visual attention capacity: processing speed and apprehension span. Using a simple test, these cognitive factors can be analyzed by Bundesen's Theory of Visual Attention (TVA). The method has strong specificity and sensitivity, and measurements are highly reliable. As the method is theoretically founded, it also has high validity. TVA-based assessment has recently been used to investigate a broad range of neuropsychological and neurological conditions. We present the method, including the experimental paradigm and practical guidelines to patient testing, and review existing TVA-based patient studies organized by lesion anatomy. Lesions in three anatomical regions affect visual capacity: The parietal lobes, frontal cortex and basal ganglia, and extrastriate cortex. Visual capacity thus depends on large, bilaterally distributed anatomical networks that include several regions outside the visual system. The two visual capacity parameters are functionally separable, but seem to rely on largely overlapping brain areas.

  19. Modelling auditory attention: Insights from the Theory of Visual Attention (TVA)

    DEFF Research Database (Denmark)

    Roberts, K. L.; Andersen, Tobias; Kyllingsbæk, Søren

    modelled using a log-logistic function than an exponential function. A more challenging difference is that in the partial report task, there is more target-distractor confusion for auditory than visual stimuli. This failure of object-formation (prior to attentional object-selection) is not yet effectively......We report initial progress towards creating an auditory analogue of a mathematical model of visual attention: the ‘Theory of Visual Attention’ (TVA; Bundesen, 1990). TVA is one of the best established models of visual attention. It assumes that visual stimuli are initially processed in parallel......, and that there is a ‘race’ for selection and representation in visual short term memory (VSTM). In the basic TVA task, participants view a brief display of letters and are asked to report either all of the letters (whole report) or a subset of the letters (e.g., the red letters; partial report). Fitting the model...

  20. Theory of Visual Attention (TVA) applied to mice in the 5-choice serial reaction time task

    DEFF Research Database (Denmark)

    Fitzpatrick, C. M.; Caballero-Puntiverio, M.; Gether, U.

    2017-01-01

    Rationale The 5-choice serial reaction time task (5-CSRTT) is widely used to measure rodent attentional functions. In humans, many attention studies in healthy and clinical populations have used testing based on Bundesen’s Theory of Visual Attention (TVA) to estimate visual processing speeds...... on an individual level. Scopolamine HBr dose-dependently reduced 5-CSRTT attentional performance while also increasing reward collection latency at the highest dose. Upon TVA modelling, scopolamine HBr significantly reduced visual processing speed at both doses, while having less pronounced effects on visual...... modelled using a new three-parameter version of TVA to obtain estimates of visual processing speeds, visual thresholds and motor response baselines in each mouse. Results The parameter estimates for each animal were reliable across sessions, showing that the data were stable enough to support analysis...

  1. Ecological improvements in conjunction with the new RADAG hydro power plant; Oekologische Aufwertungsmassnahmen beim Neubau des Wehrkraftwerks der RADAG

    Energy Technology Data Exchange (ETDEWEB)

    Ruess, Beatrice [RUS AG, Baden (Switzerland)

    2010-07-01

    Together the weir power plant and the upgrading measures will create salient ecological improvements of the actual conditions of the residual water route. Of special importance are the increased runoff into the Old Rhine and the additional structuring measures. The natural evasion waters combined with the Collection Gallery and the Vertical Slot fish ladder together with the new fish ladder at the Main Power Station will on one hand greatly improve the longitudinal continuum and on the other hand create habitats for species relying on strong-flowing waters. (orig.)

  2. Hydro-Quebec's buyback tariff

    International Nuclear Information System (INIS)

    Richard, J.C.

    1992-01-01

    Hydro-Quebec had an installed electric generation capacity of 25,682 MW in 1990, of which 23,927 MW was hydraulic. Of the 26 thermal power plants, 22 are in remote communities on islands or in the north part of the province. The utility's development plan predicts an annual growth in demand of 2.6% to reach ca 200 TWh in 2006; this demand would be reduced to ca 180 TWh by energy efficiency measures. To increase capacity, Hydro-Quebec can utilize the hydro generation potential of its large rivers, of which 18,000 MW is economically viable, and its small rivers. Of the 10,000 MW theoretical potential of the latter, a large fraction cannot be economically developed under existing conditions. The utility has a policy to purchase energy as a function of the price of fossil fuel. For wind energy, this price was 4.22 cents/kWh in 1991; this price will be increased annually according to the inflation index. In its isolated sites such as the Magdalen Islands, current costs of diesel-generated electricity are at least 5.5 cents/kWh. There are possibilities for installing wind plants in isolated regions but their automatic control systems need to be improved for achieving a larger utilization factor relative to diesel generation and their cost needs to be reduced. 1 tab

  3. Vibration analysis of a hydro generator for different operating regimes

    Science.gov (United States)

    Haţiegan, C.; Pădureanu, I.; Jurcu, M.; Nedeloni, M. D.; Hamat, C. O.; Chioncel, C. P.; Trocaru, S.; Vasile, O.; Bădescu, O.; Micliuc, D.; (Filip Nedeloni, L.; Băra, A.; (Barboni Haţiegan, L.

    2017-01-01

    Based on experimental measurements, this paper presents the vibration analysis of a hydro generator that equips a Kaplan hydraulic turbine of a Hydropower plant in Romania. This analysis means vibrations measurement to different operating regimes of the hydro generator respectively before installing it and into operation, namely putting off load mode (unexcited and excited) respectively putting on load mode. By comparing, through the experimental results obtained before and after the operation of hydro aggregates are observed vibrations improvements.

  4. Varnostni vidiki spletnega bančništva : diplomsko delo univerzitetnega študija

    OpenAIRE

    Prodanović, Stanislav

    2013-01-01

    Banke imajo, kot osrednje finančne institucije, veliko zaslug za hiter razvoj informacijske tehnologije. Če je bila še pred približno 15 leti tehnologija bank skrita pred očmi javnosti, je danes preko elektronskega bančništva povezana s komitenti bank, saj se je v zadnjem desetletju elektronsko bančništvo izkazalo za eno najbolj dobičkonosnih spletnih storitev. Spletno bančništvo je del elektronskega bančništva in omogoča opravljanje bančnih poslov preko interneta ob vseh urah dneva, hkrat...

  5. ULOGA I VAŽNOST INTELEKTUALNOG VLASNIŠTVA U PODUZETNIŠTVU

    OpenAIRE

    Milović, Tanja; Mustapić, Zrinka; Moslavac-Forjan, Davorka

    2016-01-01

    Poduzetnička aktivnost pokretač je ekonomskog rasta nacionalne ekonomije. Ona je u velikoj mjeri vezana uz razvoj inovativnih proizvoda i usluga, čiji je ključni aspekt zaštita intelektualnog vlasništva. U suvremenom poduzetničkom okruženju zaštita i primjena zaštite intelektualnog vlasništva ima značajnu ulogu u uspješnom razvoju inovacija i razvoju poslovanja općenito te time predstavlja poticaj poduzetničkoj aktivnosti. Najrazvijenije ekonomije imaju i najveći stupanj zaštite intelektualno...

  6. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  7. Hydro-energy

    International Nuclear Information System (INIS)

    Bacher, P.; Tardieu, B.

    2005-01-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  8. Novel Control Strategy for Multiple Run-of-the-River Hydro Power Plants to Provide Grid Ancillary Services

    Energy Technology Data Exchange (ETDEWEB)

    Mohanpurkar, Manish; Luo, Yusheng; Hovsapian, Rob; Muljadi, Eduard; Gevorgian, Vahan; Koritarov, Vladimir

    2017-07-12

    Hydropower plant (HPP) generation comprises a considerable portion of bulk electricity generation and is delivered with a low-carbon footprint. In fact, HPP electricity generation provides the largest share from renewable energy resources, which include wind and solar. Increasing penetration levels of wind and solar lead to a lower inertia on the electric grid, which poses stability challenges. In recent years, breakthroughs in energy storage technologies have demonstrated the economic and technical feasibility of extensive deployments of renewable energy resources on electric grids. If integrated with scalable, multi-time-step energy storage so that the total output can be controlled, multiple run-of-the-river (ROR) HPPs can be deployed. Although the size of a single energy storage system is much smaller than that of a typical reservoir, the ratings of storages and multiple ROR HPPs approximately equal the rating of a large, conventional HPP. This paper proposes cohesively managing multiple sets of energy storage systems distributed in different locations. This paper also describes the challenges associated with ROR HPP system architecture and operation.

  9. Functional testing of a fish sluice, Buchholz small hydro plant - Final report; Funktionskontrolle Fischschleuse, KWKW Buchholz - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Ruhle, Ch. [Buero fuer Jagd- und Fischereifragen, Schmerikon (Switzerland); Scherrer, I. [Entegra Wasserkraft AG, St. Gallen (Switzerland)

    2009-01-15

    Since more than 100 years the diversion hydropower plant of Buchholz at the river Glatt (canton Saint Gall) has been out of operation. With its reactivation as run-of-river scheme, the river meadow, originated due to sedimentation in the former storage basin, with its beaver habitat, could be preserved. For the first time in Switzerland, a fish lock was implemented for the upstream passage way for fish. The fish lock was built directly into for stability reasons newly constructed secondary concrete at the downstream side of the old dam. At the upper lock opening a weir basked is installed, where the migrating fish are recorded. The examination proofed that the fish lock in principle is working for strong swimming fish species (qualitative proof of the performance control). In case of flood caused drift, the migrating fish seem to accept the fish passage. The attempt to quantify the proportion of the migrating willing fish which actually swim through the lock (quantitative proof of the performance control) did not produce satisfactory results. (authors)

  10. Novel Control Strategy for Multiple Run-of-the-River Hydro Power Plants to Provide Grid Ancillary Services

    Energy Technology Data Exchange (ETDEWEB)

    Mohanpurkar, Manish; Luo, Yusheng; Hovsapian, Rob; Muljadi, Eduard; Gevorgian, Vahan; Koritarov, Vladimir

    2017-05-01

    Electricity generated by Hydropower Plants (HPPs) contributes a considerable portion of bulk electricity generation and delivers it with a low carbon footprint. In fact, HPP electricity generation provides the largest share from renewable energy resources, which includes solar and wind energy. The increasing penetration of wind and solar penetration leads to a lowered inertia in the grid and hence poses stability challenges. In recent years, breakthrough in energy storage technologies have demonstrated the economic and technical feasibility of extensive deployments in power grids. Multiple ROR HPPs if integrated with scalable, multi time-step energy storage so that the total output can be controlled. Although, the size of a single energy storage is far smaller than that of a typical reservoir, cohesively managing multiple sets of energy storage distributed in different locations is proposed. The ratings of storages and multiple ROR HPPs approximately equals the rating of a large, conventional HPP. The challenges associated with the system architecture and operation are described. Energy storage technologies such as supercapacitors, flywheels, batteries etc. can function as a dispatchable synthetic reservoir with a scalable size of energy storage will be integrated. Supercapacitors, flywheels, and battery are chosen to provide fast, medium, and slow responses to support grid requirements. Various dynamic and transient power grid conditions are simulated and performances of integrated ROR HPPs with energy storage is provided. The end goal of this research is to investigate the inertial equivalence of a large, conventional HPP with a unique set of multiple ROR HPPs and optimally rated energy storage systems.

  11. Forecasting analysis of runoff for reservoir regulation of dams and weirs in terms of hydro power plant operation

    International Nuclear Information System (INIS)

    Maradjieva, Mariana; Nikolov, Nikola

    2008-01-01

    In order to meet the needs of Hydropower Plant (HPP) production new algorithms and software were developed for daily, seasonal, annual and long-term control of the runoff for the design of dam and weirs. This control is carried out for monitored periods from 20 to 50 years. The control depends on economic considerations, namely that the accepted probability of required water power is 90%, i.e. concerning the runoff and in this way for the useful volume of water dams. The research is accomplished by a design with the observations. First the hydrometric stations are selected at the available analogy with the building project and then the correlative connection is found assessed by general and true correlative coefficients. The transferring to the project of the observations for the average annual and average monthly water discharges is made with the coefficient of the analogy. The theoretical probability curves are chosen with a minimum dispersion. By the last curves the average monthly distributions are settled with probability from 2% to 90% by statistical method. During the investigated period of the regulation the volumes of discharge, overflow and shortage are calculated as and the determination for the accepted volume of the reservoir if the normative probability of the need is executed. As well the power output of the HPP and its participation in the coverage of the charge diagram on the peak load, under peak load, daily and nightly part are determined in separate observed or forecasting periods. The upper problems about the design and the operation of HPP, water output, reservoir volume and coverage of the charge diagram are solved by iterations. Practical examples are given for the runoff and for the time forecasting system.

  12. Competition policy and regulation in hydro-dominated electricity markets

    International Nuclear Information System (INIS)

    Rangel, Luiz Fernando

    2008-01-01

    This paper discusses the main competition issues that arise in electricity systems dominated by hydro generation, arguing that technological differences between hydro and thermal plants may allow hydropower producers to exert market power in different and subtler ways compared to thermal generators. The key for market power in hydro-based systems is the strategic allocation of a given amount of output across periods, rather than a straightforward reduction of total output. The paper examines the interaction between strategic hydro reservoir operation and transmission capacity constraints, and summarizes the implications of market power for system reliability. A review of recent relevant literature is included. Finally, possible interventions to mitigate market power are analysed

  13. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  14. Fluid transient analysis and design considerations in TVA PWR feedwater systems and steam generators

    International Nuclear Information System (INIS)

    Kelley, B.T.

    1979-01-01

    TVA has evaluated a number of fluid transients in an effort to discover areas of potential problems and to improve overall unit operation. The transients recently or currently being evaluated fall into four major areas - accident analyses, fast valving, heater drain systems, and steam generators. A discussion of each area follows

  15. 18 CFR 1304.407 - Development within flood control storage zones of TVA reservoirs.

    Science.gov (United States)

    2010-04-01

    ... flood control storage zones of TVA reservoirs. 1304.407 Section 1304.407 Conservation of Power and Water... documentation related to flood control storage, provided the loss of flood control storage caused by the project... control storage. If this determination can be made, the applicant must then demonstrate how the loss of...

  16. Neural markers of individual and age differences in TVA attention capacity parameters

    DEFF Research Database (Denmark)

    Wiegand, Iris

    2013-01-01

    The ‘Theory of Visual Attention’ quantifies an interindividual’s capacity of attentional resources in parameters visual processing speed C and vSTM storage capacity K. Distinct neural markers of interindividual differences in these functions were identified by combining TVA-based assessment...

  17. Theory of Visual Attention (TVA) applied to mice in the 5-choice serial reaction time task.

    Science.gov (United States)

    Fitzpatrick, C M; Caballero-Puntiverio, M; Gether, U; Habekost, T; Bundesen, C; Vangkilde, S; Woldbye, D P D; Andreasen, J T; Petersen, A

    2017-03-01

    The 5-choice serial reaction time task (5-CSRTT) is widely used to measure rodent attentional functions. In humans, many attention studies in healthy and clinical populations have used testing based on Bundesen's Theory of Visual Attention (TVA) to estimate visual processing speeds and other parameters of attentional capacity. We aimed to bridge these research fields by modifying the 5-CSRTT's design and by mathematically modelling data to derive attentional parameters analogous to human TVA-based measures. C57BL/6 mice were tested in two 1-h sessions on consecutive days with a version of the 5-CSRTT where stimulus duration (SD) probe length was varied based on information from previous TVA studies. Thereafter, a scopolamine hydrobromide (HBr; 0.125 or 0.25 mg/kg) pharmacological challenge was undertaken, using a Latin square design. Mean score values were modelled using a new three-parameter version of TVA to obtain estimates of visual processing speeds, visual thresholds and motor response baselines in each mouse. The parameter estimates for each animal were reliable across sessions, showing that the data were stable enough to support analysis on an individual level. Scopolamine HBr dose-dependently reduced 5-CSRTT attentional performance while also increasing reward collection latency at the highest dose. Upon TVA modelling, scopolamine HBr significantly reduced visual processing speed at both doses, while having less pronounced effects on visual thresholds and motor response baselines. This study shows for the first time how 5-CSRTT performance in mice can be mathematically modelled to yield estimates of attentional capacity that are directly comparable to estimates from human studies.

  18. Hydro-climatology

    DEFF Research Database (Denmark)

    The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal with under......The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal...... considered. The interdisciplinary approach reveals information and perspective that go beyond the study of cli ate and hydro gy alone...

  19. 76 FR 53994 - Final Environmental Impact Statement, Single Nuclear Unit at the Bellefonte Plant Site, Jackson...

    Science.gov (United States)

    2011-08-30

    ... limited to, wind, solar, natural and methane gas, hydroelectric, and lignite coal. TVA also purchases... even with substantial energy replacement through conservation measures, TVA must still add new base... plant species have been previously reported to verify if the rare species are still present in the...

  20. Hydro under shock

    International Nuclear Information System (INIS)

    Maffezzini, I.; Pineault, E.; Poirier, M.

    1997-01-01

    A discussion of the potential privatisation of Hydro-Quebec, and of the motivation to do so, was presented. The creation of Hydro-Quebec resulted from the nationalization in 1963 of all major electricity producers in the province of Quebec. Since its inception, Hydro-Quebec has gone through many episodes of restructuring but none more far reaching in extent, or in consequences, than the present one. The current deregulation of the electrical industry in Quebec, and the potential commercialization of Hydro-Quebec is considered to be a natural and inevitable result of the current global trend towards competition in the power industry and the demand for greater consumer choice. 1 tab

  1. Realisation of a small hydro power plant in the new water reservoir of the water supply of the San Abbondio municipality; Realizzazione di una microcentrale nel nuovo serbatoio dell'acquedotto del comune di S. Abbondio. Progetto definitivo nuovo serbatoio. Progetto di massima e studio varianti microcentrale

    Energy Technology Data Exchange (ETDEWEB)

    Conti, M.

    2008-12-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the construction project of a new water reservoir including a micro-scale hydro power plant in the drinking-water supply of the municipality of San Abbondio, Switzerland. Following the development of residential areas a new water reservoir located at higher elevation is needed. A former preliminary study had demonstrated the feasibility of a micro-scale hydro power plant in the water supply. The adaptation of the plant design to the new situation is described. Investment cost is estimated and several variants are compared. Recommendations are given to the authorities.

  2. Revitalizing the nuclear business at Ontario Hydro

    International Nuclear Information System (INIS)

    Talbot, K.

    1994-01-01

    Ontario Hydro, North America's largest electric power utility, with an installed capacity of 34,000 MW, has under gone a major restructuring over the past year to better align itself with a changing electricity market and evolving customer needs. The single largest new business unit within the new Ontario Hydro is Ontario Hydro Nuclear (OHN), responsible for engineering, operation and maintenance of the Corporation's 20 large nuclear units at three generating sites, OHN faces a significant challenge in returning Ontario's nuclear units to the world-leading performance levels they enjoyed in the past, particularly the older Pickering A and Bruce A plants. However, steady progress is being made as evidenced by improving peer reviews and overall capacity and financial performance

  3. Provincial hydro expansions

    Energy Technology Data Exchange (ETDEWEB)

    Froschauer, K J

    1993-01-01

    A study of the development of five provincial hydroelectric utilities in Canada indicates that power companies and the state invited manufacturers to use hydroelectricity and natural resources in order to diversify provincial economies. These hydro expansions also show that utilities and government designed hydro projects to serve continental requirements; serving both objectives became problematic. It is argued that when the Canadian state and firms such as utilities use hydro expansions to serve both continentalism and industrialization, then at best they foster dependent industrialization and staple processing. At worst, they overbuild the infrastructure to generate provincial surplus energy for continental, rather than national, integration. Hydro developments became subject to state intervention in Canada mainly through the failures of private utilities to provide power for the less-lucrative industrial markets within provincial subregions. Although the state and utilities invited foreign firms to manufacture hydro equipment within the provinces and others to use electricity to diversify production beyond resource processing, such a diversification did not occur. Since 1962, ca 80% of industrial energy was used to semi-process wood-derived products, chemicals, and metals. The idea for a national power network became undermined by interprovincial political-economic factors and since 1963, the federal national/continential power policy prevailed. 187 refs., 6 figs., 52 tabs.

  4. Innovative private micro-hydro power development in Rwanda

    International Nuclear Information System (INIS)

    Pigaht, Maurice; Plas, Robert J. van der

    2009-01-01

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (i) institutional arrangements rather than technical quality determine the success of such projects; (ii) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (iii) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too.

  5. Innovative private micro-hydro power development in Rwanda

    Energy Technology Data Exchange (ETDEWEB)

    Pigaht, Maurice; Van der Plas, Robert J. [MARGE-Netherlands, Brem 68, 7577 EW Oldenzaal (Netherlands)

    2009-11-15

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (1) institutional arrangements rather than technical quality determine the success of such projects; (2) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (3) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too. (author)

  6. Small steps for hydro

    International Nuclear Information System (INIS)

    Wicke, Peter

    1998-01-01

    The government in Peru has decided to utilise its gas reserves and restrict hydro to relatively small schemes. A number of reasons for the decision are given. In 1997, the Shell-Mobile-Bechtel-COSAPI consortium was formed and agreements were signed regarding exploiting Gas de Camisea. The country's energy needs to 2010 are being assessed. It is likely that by 2001 the whole of south Peru will be receiving gas from Camisea. The Peru situation is discussed under the headings of (i) existing capacity, (ii) growing demands, (iii) a history of hydro in Peru, (iv) electrification and SHP and (v) outlook. The future for Peru's electric energy development is bright. While most of its new power capacity will come from natural gas, the small hydros also have a part to play. A stronger commitment of national and regional political authorities to consider supplies outside the big cities is said to be needed. (UK)

  7. Ontario Hydro decontamination experience

    Energy Technology Data Exchange (ETDEWEB)

    Lacy, C S; Patterson, R W; Upton, M S [Chemistry and Metallurgy Department, Central Production Services, Ontario Hydro, ON (Canada)

    1991-04-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  8. Ontario Hydro decontamination experience

    International Nuclear Information System (INIS)

    Lacy, C.S.; Patterson, R.W.; Upton, M.S.

    1991-01-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  9. Retrofitting the small-scale hydro power plant 'La Chocolatiere' in Echandens-Bussigny, Switzerland; Rehabilitation de la petite centrale de la Chocolatiere (Echandens - Bussigny)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-05-15

    This report for the Swiss Federal Office of Energy (SFOE) is a project study for the retrofitting of a small-scale hydro power plant installed on the River Venoge, between the communities of Echandens and Bussigny, western Switzerland. At this site, hydro power is used since the 18{sup th} century. A permanent license to use at most 3 m{sup 3}/s is available. The study concludes that the maximum flow rate of 6 m{sup 3}/s would be more advantageous, implying a 35 cm higher dam on the river. Two turbines could then be installed, leading to the maximum electric power of 177 kW and the power production of 727,000 kWh/y. From the detailed inventory of the retrofitting work and the installation of the new turbines - including a new fish ladder according to the legislation in force - the authors conclude that electricity could be generated at a cost amounting to about CHF 0.24/kWh. It is recommended to request the modification of the water use license in order to be able to use up to 6 m{sup 3}/s.

  10. Order Responding to November 18, 2002 Petitoner's Request that the Administrator Object to the TVA John Sevier Fossil Plant and the TVA Kingston Fossil Plant Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. Small hydro in Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2011-10-01

    Full Text Available hydro, the author has started an online database of small hydropower projects in eastern and southern Africa. The main aim of the database is to catalogue the current situation and to make that accessible to policymakers, project developers, as well...

  12. The 'Les iles' small-hydro power plant - Summary analysis; Analyse sommaire. Petite centrale hydroelectrique de Sombeval 'Les iles' - Rapport 2008

    Energy Technology Data Exchange (ETDEWEB)

    Hausmann, M.

    2008-01-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the River Suze in the Swiss Jura Mountains. The installation is to be made at the site of a small dam that previously provided water for a water-wheel-driven sawmill. A fish-pass at the site is also foreseen. The report presents details on the hydrological data for the river and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as are the regulation of water levels and the removal of river sediment. The electricity production expected is discussed, as is the economic viability of the project.

  13. Demystification and localization in the adoption of micro-hydro technology : Insights from India

    NARCIS (Netherlands)

    Höffken, J.I.

    2016-01-01

    The phrase ‘small is beautiful’ holds true for the micro-hydro plants discussed in this article. Micro-hydro plants can convert the energy of falling water into electricity. In India, access to electricity cannot be taken for granted, especially in rural areas, which do not yet have grid extension

  14. Feasibility study for the installation of a small hydro electric power plant; Etude de faisabilite. Petite centrale hydro-electrique au lieu dit 'Sous les Roches' a Sonceboz

    Energy Technology Data Exchange (ETDEWEB)

    Tissot, N. [MHyLab, Mini-Hydraulics Laboratory, Montcherand (Switzerland); Hausmann, H. [Hans Hausmann, Bevilard (Switzerland)

    2003-07-01

    This report for the Swiss Federal Office of Energy presents a technical, economical and ecological analysis of the feasibility of a small hydroelectric power plant at Sonceboz, in the Swiss Jura mountains. The power of the planed plant would typically be 500 kW for a water head of about 10 m. The study shows that, compared to one single turbine, a pair of Kaplan type turbines would be operational over a larger range of the river's water flow rate. This solution would be a little bit more costly but offer more flexibility for maintenance. Two maximum water flow rates are considered, 4.5 and 6 m{sup 3}/s respectively. According to the economical study, done with current electric kWh prices, both configurations are viable while the largest flow rate leads to a larger profit. The report is rounded up by a sensitivity analysis considering variations in annual power generation, electro-mechanical and construction cost as well as turbine efficiency. It indicates that this last factor could be crucial for the overall profitability. [French] Ce rapport est le resultat detaille de l'analyse technico-economique et ecologique de faisabilite de la realisation d'une petite centrale hydroelectrique basse chute qui pourrait exploiter une denivellation d'environ 10 m pour une puissance de l'ordre de 500 kW pres de Sonceboz dans le Jura suisse. L'etude montre que le couplage de deux turbines Kaplan offrirait une possibilite de fonctionnement sur une plus grande plage de flux ainsi qu'une plus grande flexibilite de maintenance, ceci pour un cout legerement superieur a l'option a une seule turbine. Les debits de 4.5 et 6 m{sup 3}/s sont consideres. L'etude economique montre que le debit de 6 m{sup 3}/s est plus rentable au prix de vente actuel du kWh. L'article se termine par une analyse de sensibilite sur les incertitudes concernant la production annuelle, les prix de l'electromecanique et du genie civil et le rendement des

  15. Economically viable and environment-friendly hydro energy in Estonia

    International Nuclear Information System (INIS)

    Saks, Ants; Velner, Harald

    2001-01-01

    Hydro energy has been in oblivion in Estonia for about 30 years now. During the 1960s, most of Estonia's small hydropower plants were closed down, just as it was done in the whole Soviet Union. As the only larger hydro plant, the 125 MW plant in Narva, was situated on the Russian side of the Narva River, there were only two or three small hydro plants left. Even those were exploited at low capacity and mainly for heating the buildings. It was not until the 1990s that a number of enthusiasts started to re-establish the hydro plants by reconstructing old installations. The pre-feasibility study 'Hydropower in Estonia' proposed by Estonian and Swedish experts, showed that the restoration of the hydropower plants and watermills is economically feasible and technically possible if advanced technology is used. Hydropower as an alternative ('green') energy source should be used in the best technical-economical way. The first pilot plant in Estonia, the 200 kW Kamari plant was constructed in 1998 with compact-propeller units, in co-operation with Waterpumps WP Oy and ABB. Today, ten new plants have been constructed or are under construction. Hydropower plants/watermills should be reconstructed in accordance with the legislative acts on environment protection

  16. Premagovanje izzivov življenja z disleksijo od otroštva do odraslosti

    OpenAIRE

    Javornik, Pia

    2017-01-01

    V magistrskem delu smo raziskali izzive, s katerimi se srečujejo osebe z disleksijo skozi celoten razvojni potek od otroštva do odraslosti. V teoretičnem delu smo povzeli nekatere definicije ter teoretične razlage disleksije in njeno izražanje skozi različna razvojna obdobja, vezana na potek znotraj izobraževalnega sistema. Predstavili smo zakonodajne možnosti prilagajanja vzgojno izobraževalnega procesa osebam z disleksijo v slovenskem prostoru. V nadaljevanju smo se osredotočili na značilno...

  17. VZROKI MLADOLETNIŠKEGA PRESTOPNIŠTVA IN UKREPI ZA NJEGOVO PREPREČEVANJE

    OpenAIRE

    Matija, Sabina

    2013-01-01

    Diplomska naloga obravnava mladoletniško prestopništvo. Osredotoča se na vzroke in ukrepe za preprečevanje oziroma zmanjševanje prestopništva mladih. Pozornost je posvečena še obravnavi tako mladoletnih storilcev kaznivih dejanj kot mladoletnih storilcev prekrškov. Mladoletniško prestopništvo obsega kazniva dejanja in druge oblike deviantnega, negativnega odklonskega vedenja otrok in mladoletnikov, vendar je pri nas sprejeto ožje pojmovanje omenjenega pojava. Po tem konceptu obravnava kaz...

  18. Remote micro hydro

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    The micro-hydro project, built on a small tributary of Cowley Creek, near Whitehorse, Yukon, is an important step in the development of alternative energy sources and in conserving expensive diesel fuel. In addition to demonstrating the technical aspects of harnessing water power, the project paved the way for easier regulatory procedures. The power will be generated by a 9 meter head and a 6 inch crossflow turbine. The 36 V DC power will be stored in three 12 V batteries and converted to ac on demand by a 3,800 watt inverter. The system will produce 1.6 kW or 14,016 kWh per year with a firm flow of 1.26 cfs. This is sufficient to supply electricity for household needs and a wood working shop. The project is expected to cost about $18,000 and is more economical than tying into the present grid system, or continuing to use a gasoline generator. An environmental study determined that any impact of the project on the stream would be negligible. It is expected that no other water users will be affected by the project. This pilot project in micro-hydro applications will serve as a good indicator of the viability of this form of alternate energy in the Yukon. The calculations comparing the micro-hydro and grid system indicate that the mico-hydro system is a viable source of inflation-proof power. Higher heads and larger flow resulting in ac generation in excess of 10 kW would yield much better returns than this project. 3 tabs.

  19. Rural hydro technology

    International Nuclear Information System (INIS)

    Fowlie, M.

    1999-01-01

    This paper examines the increasing use of micro hydroelectric schemes for power generation in mountainous communities in Asia to alleviate some of the pressures on forests. An example of such a scheme in Pakistan is given, and the installation and operation of small hydro units, socio-economic factors, and the impact of the projects on the position of women in the community are discussed. (UK)

  20. Hydro-power

    International Nuclear Information System (INIS)

    Piro, P.

    2010-01-01

    On average the hydro-power sector produces 12% of the electrical power in France. A quarter of this production might pass to another operator than EDF because the end of some grants is nearing (2012 for 12 installations). In France the power of rivers belongs to the state that gives operators grants to harness it. The allowance lasts 75 years usually but for installations below 4.5 MW a permanent and definitive grant is allowed. Most installations are ancient and their investment have been paid off since a long, so hydro-power is the most profitable renewable energy in France. A lot of bidders are expected. Each bid will be assessed on 3 criteria: -) the global energy efficiency of the waterfall, -) a balanced management of the water resource, and -) an economic and financial offer to the state. The balance between the different uses of water is getting more delicate to reach and this renewal of grants will be an opportunity for the state to impose a better preservation of the environment. In July 2008, the French government announced a program for the re launching of the hydro-power, this program has been reduced and now only 3000 GWh supplementary are expected by 2020. (A.C.)

  1. Role of Pumped Storage Hydro Resources in Electricity Markets and System Operation: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Ela, E.; Kirby, B.; Botterud, A.; Milostan, C.; Krad, I.; Koritarov, V.

    2013-05-01

    The most common form of utility- sized energy storage system is the pumped storage hydro system. Originally, these types of storage systems were economically viable simply because they displace more expensive generating units. However, over time, as those expensive units became more efficient and costs declined, pumped hydro storage units no longer have the operational edge. As a result, in the current electricity market environment, pumped storage hydro plants are struggling. To offset this phenomenon, certain market modifications should be addressed. This paper will introduce some of the challenges faced by pumped storage hydro plants in today's markets and purpose some solutions to those problems.

  2. trans-11 18:1 Vaccenic Acid (TVA Has a Direct Anti-Carcinogenic Effect on MCF-7 Human Mammary Adenocarcinoma Cells

    Directory of Open Access Journals (Sweden)

    Ji-Na Lim

    2014-02-01

    Full Text Available Trans vaccenic acid (TVA; trans-11 18:1 is a positional and geometric isomer of oleic acid and it is the predominant trans isomer found in ruminant fats. TVA can be converted into cis-9, trans-11 conjugated linoleic acid (c9, t11-CLA, a CLA isomer that has many beneficial effects, by stearoyl CoA desaturase 1 (SCD1 in the mammary gland. The health benefits associated with CLA are well documented, but it is unclear whether trans fatty acids (TFAs from ruminant products have healthy effects. Therefore, the effects of TVA on the proliferation of MCF-7 human breast adenocarcinoma cells and MCF-10A human breast epithelial cells were investigated in the present study. Results showed that TVA inhibited the proliferation of MCF-7 cells but not MCF-10A cells by down-regulating the expression of Bcl-2 as well as procaspase-9. In addition, the suppressive effect of TVA was confirmed in SCD1-depleted MCF-7 cells. Our results suggested that TVA exerts a direct anti-carcinogenic effect on MCF-7 cells. These findings provided a better understanding of the research on the anti-carcinogenic effects of TVA and this may facilitate the manufacture of TVA/c9, t11-CLA fortified ruminant products.

  3. An artificial intelligence (AI) NOx/heat rate optimization system for Ontario Hydro`s fossil generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Luk, J.; Frank, A.; Bodach, P. [Ontario Hydro, Toronto, ON (Canada); Warriner, G. [Radian International, Tucker, GA (United States); Noblett, J. [Radian International, Austin, TX (United States); Slatsky, M. [Southern Company, Birmingham, AL (United States)

    1999-08-01

    Artificial intelligence (AI)-based software packages which can optimize power plant operations that improves heat rate and also reduces nitrogen oxide emissions are now commonly available for commercial use. This paper discusses the implementation of the AI-based NOx and Heat Rate Optimization System at Ontario Hydro`s generation stations, emphasizing the current AI Optimization Project at Units 5 and 6 of the Lakeview Generating Station. These demonstration programs are showing promising results in NOx reduction and plant performance improvement. The availability of the plant Digital Control System (DCS) in implementing AI optimization in a closed-loop system was shown to be an important criterion for success. Implementation of AI technology at other Ontario Hydro fossil generating units as part of the overall NOx emission reduction system is envisaged to coincide with the retrofit of the original plant control system with the latest DCS systems. 14 refs., 3 figs.

  4. The Properties of Binary and Ternary Ti Based Coatings Produced by Thermionic Vacuum Arc (TVA Technology

    Directory of Open Access Journals (Sweden)

    Aurelia Mandes

    2018-03-01

    Full Text Available A series of the multicomponent thin films (binary: Ti-C; Ti-Ag and ternary: Ti-C-Ag; Ti-C-Al were fabricated by Thermionic Vacuum Arc (TVA technology in order to study the wear resistance and the anticorrosion properties. The effects of Ti amount on the microstructure, tribological and morphological properties were subsequently investigated. TVA is an original deposition method using a combination of anodic arc and electron gun systems for the growth of films. The samples were characterized using scanning electron microscope (SEM and a transmission electron microscope (TEM accompanied by selected area electron diffraction (SAED. Tribological properties were studied by a ball-on-disc tribometer in the dry regime and the wettability was assessed by measuring the contact angle with the See System apparatus. Wear Rate results indicate an improved sliding wear behavior for Ti-C-Ag: 1.31 × 10−7 mm3/N m (F = 2 N compared to Ti-C-Al coating wear rate: 4.24 × 10−7 mm3/N m. On the other hand, by increasing the normal load to 3 N an increase to the wear rate was observed for Ti-C-Ag: 2.58 × 10−5 mm3 compared to 2.33 × 10−6 mm3 for Ti-C-Al coating.

  5. TVA, Abnormal Return, and Investor Perception on Changing of Tick Size 2 May 2016

    Directory of Open Access Journals (Sweden)

    Tri Gunarsih

    2017-07-01

    Full Text Available The objective of this study was to analyze the market reaction to the changing of capital market’s tick size regulation in May 2, 2016. The main goal of the regulation was to increase the capital market liquidity, then it’s important to test whether there was a difference in market liquidity before and after the regulation released. The method of this study was studying with Trading Volume Activity (TVA and abnormal return based on secondary data and also investor perception based on primary data. The secondary data consist of 65 samples of listed companies in Indonesia Stock Exchange. The primary data consist of 67 investors in Yogyakarta that were selected using purposive sampling method.The result of this study was mix, there was no difference before and after the release of regulation in TVA, but there was a difference in abnormal return. The result of investor perception shows that there was a positive response to the changing of tick size regulation.

  6. Fishy Business: Response of Stream Fish Assemblages to Small Hydro-power Plant Induced Flow Alteration in the Western Ghats, Karnataka

    Science.gov (United States)

    Rao, S. T.; Krishnaswamy, J.; Bhalla, R. S.

    2017-12-01

    Alteration of natural flow regimes is considered as a major threat to freshwater fish assemblages as it disturbs the water quality and micro-habitat features of rivers. Small hydro-power (SHP), which is being promoted as a clean and green substitute for large hydro-power generation, alters the natural flow regime of head-water streams by flow diversion and regulation. The effects of altered flow regime on tropical stream fish assemblages, driven by seasonality induced perturbations to water quality and microhabitat parameters are largely understudied. My study examined the potential consequences of flow alteration by SHPs on fish assemblages in two tributaries of the west-flowing Yettinahole River which flows through the reserved forests of Sakleshpur in the Western Ghats of Karnataka. The flow in one of the tributaries followed natural flow regime while the other comprised three regimes: a near-natural flow regime above the dam, rapidly varying discharge below the dam and a dewatered regime caused by flow diversion. The study found that the altered flow regime differed from natural flow regime in terms of water quality, microhabitat heterogeneity and fish assemblage response, each indicative of the type of flow alteration. Fish assemblage in the natural flow regime was characterized by a higher catch per site, a strong association of endemic and trophic specialist species. The flow regime above the dam was found to mimic some components of the natural flow regime, both ecological and environmental. Non endemic, generalist and pool tolerant species were associated with the dewatered regime. There was a lack of strong species-regime association and an overall low catch per site for the flow regulated regime below the dam. This study highlights the consequences of altered flows on the composition of freshwater fish assemblages and portrays the potential of freshwater fish as indicators of the degree and extent of flow alteration. The study recommends the need for

  7. Fouling in small hydro projects; Verschmutzung von Kleinwasserkraftwerken - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Abgottspon, A.; Staubli, T.

    2010-03-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) takes a look at fouling problems encountered in small hydro installations. The report is based on ten interviews made with operators of small hydro power stations in Switzerland. A parallel project carried out in Germany is mentioned. A large variation in the degree of fouling in the various hydro power stations is noted. Sources such as leaves in autumn and algae are discussed, as are the various rinsing procedures used to clear the turbines of fouling. Power losses are discussed and measures that can be taken to prevent fouling are described. Measurements made at an installation in Freienstein, Switzerland, are presented and discussed. The report is completed with an appendix containing calculations, details on the Freienstein power plant and the results of interviews made with the ten hydro power installations examined.

  8. Global warming: a changing climate for hydro

    International Nuclear Information System (INIS)

    Oud, E.

    1993-01-01

    This paper quantifies the benefits attributable to hydroelectric power generation in preventing carbon dioxide emissions from the use of thermal plants. It proposes that utilities and funding agencies consider the societal costs associated with the emission of CO 2 in power system planning. It also suggests that the industrialized countries should consider changing their funding practice and give more appropriate credits for the construction of hydro plants in developing countries, with a view to avoiding the construction and operation of fossil fuelled powerplants. (author)

  9. Challenging hydro-hegemony

    DEFF Research Database (Denmark)

    Wessels, Josepha Ivanka

    2015-01-01

    Bank. Both case studies show that control over water resources and supply provides political power over others at local level. Yet non-violent resistance can be observed in these border areas. In border areas between Israel, Syria and Palestine, control over access and water supply plays an important...... role in the ability of Israel to exercise hegemonic power in daily hydro-politics, which in the long term is detrimental for the people and the environment and disrupts the hydrological balance in the entire Jordan River basin....

  10. Ontario Hydro annual report 1986

    Energy Technology Data Exchange (ETDEWEB)

    1987-04-01

    Ontario Hydro`s annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics.

  11. Hydro-energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Bacher, P. [Electricite de France (EDF), 75 - Paris (France); Tardieu, B. [Coyne et Bellier, 92 - Gennevilliers (France)

    2005-07-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  12. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Jackson, H.A.; Woodhead, L.W.; Fanjoy, G.R.

    1984-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations for the workers and the public

  13. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  14. Bioluminescent Bioreporter Pseudomonas putida TVA8 as a Detector of Water Pollution. Operational Conditions and Selectivity of Free Cells Sensor

    Czech Academy of Sciences Publication Activity Database

    Kuncová, Gabriela; Pazlarová, J.; Hlavatá, Alena; Ripp, S.; Sayler, G.S.

    2011-01-01

    Roč. 11, č. 3 (2011), s. 882-887 ISSN 1470-160X R&D Projects: GA MŠk ME 893 Institutional research plan: CEZ:AV0Z40720504 Keywords : whole-cell biosensor * bioluminiscence * pseudomonas putida TVA8 Subject RIV: EI - Biotechnology ; Bionics Impact factor: 2.695, year: 2011

  15. Hydro in the Kyoto era

    International Nuclear Information System (INIS)

    Bourdon, M.-C.

    2003-01-01

    Quebec has the best performance in North America in terms of greenhouse gas (GHG) emissions. Unlike neighbouring provinces and states which rely heavily on coal for power generation, Quebec generates 96 per cent of its electricity from hydroelectric power. However, no new dams have been built in the past decade in Quebec due to land disputes with Aboriginal communities and general distrust among many ecologists. It takes about 12 years for a hydroelectric project to come to fruition. For that reason, and in order to capitalize on energy market opportunities, Hydro-Quebec is seriously considering expanding its generating capability beyond the needs of Quebec consumers, with gas-fired thermal generating stations. Environmental groups claim that the proposal to build the Suroit combined-cycle facility near the United States border destroys Quebec's efforts to honour the Kyoto Protocol. Economists argue that it is entirely in the spirit of Kyoto if exports of hydroelectricity or natural gas from Canada to the United States leads to less use of oil or coal. But one energy modeling expert at INRS-Energie et Materiaux claims that Quebec has a moral obligation to develop hydroelectricity for its own use as well as for export purposes, noting that any country with the good fortune to have renewable forms of energy, such as wind and hydro, should develop them to lower world GHG emissions. Quebec has many opportunities to sell hydroelectricity even while domestic demand grows. Hydroelectricity from Quebec should interest some states that have adopted their own GHG reduction standards, despite the U.S. government's refusal to ratify Kyoto. It should also interest Ontario and the Maritimes because they will be trying to reduce emissions from their thermal plants. The current situation does not favour the Kyoto Protocol. Exports of electricity from Quebec have dropped because no new dams have been built in recent years and gas-fired plants are looking more attractive to power

  16. Instrumentation and controls training in TVA: a story of large numbers

    International Nuclear Information System (INIS)

    Conner, D.L.

    1981-01-01

    The Tennessee Valley Authority currently has four nuclear units on line with seventeen units planned prior to the year 2000. Providing a permanent instrumentation and controls workforce, projected to be approximately 700 trades and labor craftsmen, is a formidable task requiring the cooperative efforts of many diverse groups: mangement and labor, engineers and craftsmen, students and instructors. In TVA, the primary source of skilled I and C craftsmen is through formal training programs conducted in cooperation with the craft bargaining unit, the International Brotherhood of Electrical Workers. The purpose of this paper is to describe and review the progress of two of these programs: the Instrument Mechanic Training Program and the Senior Instrument Mechanic Training Program

  17. Usability of a theory of visual attention (TVA) for parameter-based measurement of attention I

    DEFF Research Database (Denmark)

    Finke, Kathrin; Bublak, Peter; Krummenacher, Joseph

    2005-01-01

    four separable attentional components: processing speed, working memory storage capacity, spatial distribution of attention, and top-down control. A number of studies (Duncan et al., 1999; Habekost & Bundesen, 2003; Peers et al., 2005) have already demonstrated the clinical relevance......The present study investigated the usability of whole and partial report of briefly displayed letter arrays as a diagnostic tool for the assessment of attentional functions. The tool is based on Bundesen’s (1990, 1998, 2002; Bundesen et al., 2005) theory of visual attention (TVA), which assumes...... of these parameters. The present study was designed to examine whether (a) a shortened procedure bears sufficient accuracy and reliability, (b) whether the procedures reveal attentional constructs with clinical relevance, and (c) whether the mathematically independent parameters are also empirically independent...

  18. Usability of a theory of visual attention (TVA) for parameter-based measurement of attention II

    DEFF Research Database (Denmark)

    Bublak, Peter; Finke, Kathrin; Krummenacher, Joseph

    2005-01-01

    , and spatial distribution of attention. The procedure used was short enough to be applicable within a standard clinical setting. Two brain-damaged patients, selected based on lesion location and neuropsychological test profile, were compared to a control group of 22 healthy subjects. One patient with a right......Based on a 'Theory of Visual Attention' (TVA), whole and partial report of brief letter arrays is presented as a diagnostic tool to estimate four clinically significant attentional components: perceptual processing speed, visual working memory storage capacity, efficiency of top-down control...... inferior parietal lesion showed a pattern of non-spatially and spatially lateralized attention deficits that is typically found in neglect patients. Results from the second patient supported the decisive role of superior frontal brain structures for top-down control of visual attention. This double...

  19. Production method of hydrogen jet plasma process in hydro machinery

    International Nuclear Information System (INIS)

    Amini, F.

    2007-01-01

    The purpose of present paper is to the process of plasma formation in hydro machinery when a hydro turbine operates at various conditions and load rejection. By investigation the power, shock pressure , and impact effects of hydro machinery, it is revealed that energy and hydrogen are generated by the plasma process. The investigation on several turbines of various hydro power plants reveals that cold fusion process in hydro machinery generates hydrogen. The hypothesis concerning the participation of alkaline metals in river water and the atomic nuclei of the runner blade material in the formation of hydrogen are considered. It is possible to assume hydrogen, deuterium, helium, and tritium atoms (based on Dr. Mizuno and Dr. Kanarev theories) that are formed, diffuse into cavitation bubbles. The plasma is generated during the collapse of the bubble; thus, the quantity of burnt hydrogen determine the volume of generating hydrogen and the impact force caused by hydrogen explosion (noise).There are five main notions, which can determine hydrogen and plasma process: (1) turbine power effect, (2) high shock pressure, (3) crack on turbine parts, (4) impacts effects and (4) the lift of rotating parts. The frequency of the excitation lies in a range from 0.786 to 1.095 Hz.In future, it may be possible to design hydro turbines based on the plasma process that generates hydrogen; or there may exist turbines that rotate with a mixture of hydrogen explosion and water energies

  20. Small-scale hydro power plant on the main drinking water line La Rippaz in Bex, Switzerland - Feasibility study; Petite centrale hydraulique. Aduction d'eau potable La Rippaz. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    Chapallaz, J.-M. [Jean-Marc Chapallaz, Ingenieur EPFL/SIA, Baulmes (Switzerland); Meylan, D. [Perret-Gentil et Rey et Associes SA, Ingenieurs civils et Ingenieurs Conseil EPF/SIA, Lausanne (Switzerland)

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) is a feasibility study for the replacement work of the drinking-water supply line from the location of the spring water collection to a water reservoir belonging to the rock-salt mining company 'Hotel des Salines' in Bex, Switzerland. Built 1887 and following years this water supply system has already been designed for power generation as well. However, a 40 kW micro-scale turbine has only been installed 2005 in the lower part of the water supply system (hydraulic head: 115 m). The new project includes the replacement of the existing piping by a penstock, the construction of a new water collection reservoir at the highest point, the construction of a new 300 kW hydro power plant using the upper part of the water supply system (hydraulic head: 520 m), and some improvements of the existing lower power plant. The available water flow rate lies in the range 57-70 l/s, all the year round. The question arising is whether this construction project could be financed by the benefit from the sale of electricity that could be produced by the two power plants. The authors of the study estimate the power production to be 2.5 kWh/y. If the electricity can be sold at least at CHF 0.20/kWh for 25 years this could finance the whole project that has an estimated cost of CHF 7,000,000.

  1. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    Jackson, H.A.

    1982-06-01

    In 1981 Ontario Hydro generated over 100 billion KWh of electrical energy. Approximately one third of this was from nuclear units. There are ten CANDU units (5 250 MW) currently in operation, and another twelve (8 600 MW) are under construction. The presently committed nuclear expansion program is estimated to involve expenditures of 16 billion dollars over the next 10 years. About 10 000 people are employed in the nuclear design and construction program. All projects are generally on schedule, with the stations coming into service during the following time periods: Pickering B, 1983-85; Bruce B, 1984-87; Darlington, 1988-90. The status of each project is reviewed. Planning is underway for some retubing projects, as early as 1985 for Pickering A

  2. Petition to Object to the TVA Paradise Fossil Plant, Drakesboro, Kentucky, Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  3. Petition for the Administrator to Obect to TVA's Shawnee Fossil Plant's Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  4. Order Denying Petition to Object to Operating Permit for TVA's Shawnee Fossil Plant

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  5. Renewal of the small hydro power plant 'La Foulaz' on the river Orbe in Vallorbe, Switzerland; Rehabilitation de la petite centrale hydroelectrique de la Foulaz sur l'Orbe a Vallorbe. Etude d'avant projet - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Chenal, R.; Denis, V. [La Foulaz Energies SA, Vallorbe (Switzerland); Chuat, O. [RWB Eau et Environnement SA, Cernier (Switzerland)

    2009-08-15

    For now nearly four centuries, hydro power is used on the site named 'La Foulaz' on the river Orbe in the Vallorbe municipal territory. The existing small-scale hydro power plant is under neglect since 1970, although it enjoys a permanent water usage concession of 4.2 m{sup 3}/s. Since June 2008 the company 'La Foulaz Energie SA' owns the site and the water concession and is planning the renewal of the hydro power plant. The plan is to replace the existing permanent water flow rate usage concession by a higher water flow rate usage one of reasonable but limited duration. Reliable hydrological data are available from the Swiss Federal Administration as well as from the electricity utility 'Romande Energie SA' that operates the 'La Dernier' hydro power plant located up-stream. According to these data the design flow rate of 10 m{sup 3}/s has been selected for the new 'La Foulaz' plant. The available water head for the turbine is in the range 1.46 to 3-00 m, depending on the flow rate in the river Orbe. The average annual power production is estimated to 708,000 kWh. The peak electrical power would be 164 kW. With a cost recovery time of 25 years the production cost is estimated to 25 Swiss cents/kWh. This just enables to balance the budget. (author)

  6. Retrofitting the small-scale hydro power plant of Chable, municipality of Vionnaz, Switzerland - Feasibility study; Rehabilitation de la petite centrale de Chable, Commune de Vionnaz (VS) - Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-15

    A small-scale 200 kW hydro power plant has been installed 1988 on the drinking water supply system of the municipality of Vionnaz, Switzerland. It uses the elevation difference of 700 m between the springs in the mountains and the village in the Rhone river valley. A full refurbishment is suggested to improve the system efficiency and increase the water volume delivered to the turbine. The current status of the system has been evaluated. The replacement of the turbine is proposed. The water supply network of the mountain resort of Torgon located on the territory of Vionnaz should be connected to the existing reservoir ahead of the penstock. The penstock itself should be partly or totally replaced. In this way the yearly power production of 1,430 MWh could be increased by up to a factor of 2 at the attractive cost of CHF 0.06 to 0.09 per kWh, depending on the implemented variant.

  7. Application of the Aero-Hydro-Elastic Model, HAWC2-WAMIT, to Offshore Data from Floating Power Plants Hybrid Wind- and Wave-Energy Test Platform, P37

    DEFF Research Database (Denmark)

    Bellew, Sarah; Yde, Anders; Verelst, David Robert

    2014-01-01

    numerical models, which can combine the aerodynamic, hydrodynamic, structural exibility and mooring components. Very little oshore data exists, however, in order to validate these numerical models. Floating Power Plant are the developers of a oating, hybrid wind- and wave-energy device. The device uses...... the pitching wave energy devices, not only to increase and smooth the power output from the platform, but also to take the energy from the waves in a controlled manner, resulting in a stable platform for the wind turbine and a safe harbour for O&M. They are currently developing the nal design for their rst...... full-scale prototype, the P80, which has a width of 80 m. As part of the development, Floating Power Plant have completed 4 oshore test-phases (totalling over 2 years oshore operation) on a 37 m wide scaled test device, the P37. This paper focuses on the comparison of one of the leading numerical...

  8. Mapping the inbound logistics of the refineries & terminals (plants) onshore at StatoilHydro, identify main problems and issues and suggest quick wins and possible solutions

    OpenAIRE

    Julien, Ane Sofie

    2011-01-01

    Master's thesis in Firm management The aim of this paper is to identify main problems and issues in the supply chain of the inbound logistics at StatoilHydro’s onshore plants. The identification will be based on a mapping of the chain, where value added activity is in focus. The problems and issues will be evaluated and prioritized according to suggested quick wins and possible solutions will be identified. The recommended solution will be based on the elaborated theory of muda...

  9. Hydro-Quebec looks south

    International Nuclear Information System (INIS)

    Ross, P.

    1997-01-01

    The recent introduction of Hydro-Quebec, the Canadian utility, into selling cheap electric power in the United States (US) deregulated power market is described, following applications to the US Federal Energy Regulatory Commission. As its prices are so much cheaper than its US competitors, it is expected that the company will soon have many willing customers across the USA. Hydro-Quebec will remain a publicly owned utility, but has experienced restructuring in order to meet this new competitive challenge. (UK)

  10. Hydro-mechanical processes

    Energy Technology Data Exchange (ETDEWEB)

    Laouafa, F.; Kazmierczak, J.B. [Institut National de l' Environnement Industriel et des Risques (INERIS), Parc Technologique ALATA, 60 - Verneuil en Halatte (France); Armand, G. [Agence Nationale pour la Gestion des Dechets Radioactifs, Lab. de Souterrain de Meuse/Haute-Marne, 55 - Bure (France); Vaunat, J. [Catalonia UPC- Technical Univ., Barcelona (Spain); Jobmann, M.; Polster, M. [DBETEC- DBE Technology GmbH, Peine (Germany); Su, K.; Lebon, P.; Plas, F.; Armand, G.; Abou-Chakra Guery, A.; Cormery, F.; Shao, J.F.; Kondo, D. [ANDRA - Agence Nationale pour la Gestion des Dechets Radioactifs, 92 - Chatenay Malabry (France); Souley, M. [Institut National de l' Environnement Industriel et des Risques (INERIS), 54 - Nancy (France); Coll, C.; Charlier, R.; Collin, F.; Gerard, P. [Liege Univ., Dept. ArGEnCo (Belgium); Xiang Ling, Li [ESV EURIDICE, SCK.CEN, Belgian Nuclear Research Centre, Mol (Belgium); Collin, F. [Liege Univ., Charge de Recherches FNRS (Belgium); Pellet, F.L.; Fabre, G. [University Joseph Fourier, Laboratory 3S-R, 38 - Grenoble (France); Garcia-Sineriz, J.L.; Rey, M. [AITEMIN - Asociacion para la Investigacion y Desarrollo Industrial de los Recursos Naturales, Madrid (Spain); Mayor, J.C. [ENRESA - Empresa Nacional des Residuos Radioactivos, Madrid (Spain); Castellanos, E.; Romero, E.; Lloret, A.; Gens, A. [Catalunya Univ. Politecnica, UPC (Spain); Villar, M.V. [CIEMAT - Centro de Investigaciones Energeticas, Medioambientales y Tecnologicas, Madrid (Spain); Chambon, R. [Laboratoire 3S, UJF-INPG-CNRS, 38 - Grenoble (France); Czaikowski, O.; Lux, K.H. [Clausthal Univ. of Technology, Professorship for Waste Disposal and Geomechanics, Clausthal-Zellerfeld (Germany); Van Geet, M.; Bastiaens, W.; Volckaert, G.; Weetjens, E.; Sillen, X. [SCK-CEN, Waste and Disposal dept., Mol (Belgium); ONDRAF/NIRAS, Brussel (Belgium); Imbert, Ch. [CEA Saclay, Dept. de Physico-Chimie (DPC/SCCME/LECBA), 91 - Gif sur Yvette (France)] [and others

    2007-07-01

    This session gathers 13 articles dealing with: three-dimensional and time stepping modelling of the whole Meuse/Haute-Marne ANDRA URL (F. Laouafa, J.B. Kazmierczak, G. Armand, J. Vaunat, M. Jobmann, M. Polster); a constitutive model for a deep argillaceous rock using Hoek-Brown criteria (K. Su, C. Chavant, M. Souley); the long term behaviour of the Boom clay: influence of viscosity on the pore pressure distribution (C. Coll, R. Charlier, X.L. Li, F. Collin); the microstructural changes induced by viscoplastic deformations in argillaceous rocks (F.L. Pellet, G. Fabre, K. Su, P. Lebon); the engineered barrier experiment at Mont Terri rock laboratory (J.L. Garcia-Sineriz, M. Rey, J.C. Mayor); the chemical influence on the Hydro-Mechanical behaviour of high-density FEBEX bentonite (E. Castellanos, M.V. Villar, E. Romero, A. Lloret, A. Gens); the influence of water exchanges on the gallery convergence (P. Gerard, R. Charlier, R. Chambon, F. Collin); a new method for ageing resistant storage of argillaceous rock samples to achieve reproducible experimental results even after long intermediate storage times (O. Czaikowski, K.H. Lux); the installation and evaluation of a large-scale in-situ shaft seal experiment in Boom clay the RESEAL project M. Van Geet, W. Bastiaens, G. Volckaert, E. Weetjens, X. Sillen, A. Gens, M.V. Villar, Ch. Imbert, M. Filippi, F. Plas); the hydro-Mechanical response of the Callovo-Oxfordian mud-stone around a deep vertical drift (J. Vaunat, B. Garitte, A. Gens, K. Su, G. Armand); the sensitivity of total stress to changes in externally applied water pressure in KBS-3 buffer bentonite (J.F. Harrington, D.J. Birchall, P. Sellin); the comparison of the poro-elastic behavior of Meuse/Haute Marne and Tournemire argillites: effect of loading and saturation states (E. Bemer, A. Noiret, F. Homand, A. Rejeb); and the multi-scale modelling of the argillites mechanical behaviour (A. Abou-Chakra Guery, F. Cormery, K. Su, J.F. Shao, D. Kondo)

  11. A tale of three hydros - post-privatisation in Patagonia

    International Nuclear Information System (INIS)

    Smith, H.F.

    1994-01-01

    When Argentina's state-owned utility, operating in northern Patagonia, sold off hydro-electric generating plants in 1993, they were bought by several North American utility companies. This article looks at the problems these companies encountered and examines whether the enterprise has shown itself to be economically valuable. (UK)

  12. Međuovisnost industrijalizacije i nekih oblika socijalne mobilnosti stanovništva u sisačkom i petrinjskom kraju

    Directory of Open Access Journals (Sweden)

    Zdenko Braičić

    2012-01-01

    Full Text Available U prvom dijelu rada analiziraju se odabrani oblici socijalne mobilnosti stanovništva sisačkog i petrinjskog kraja između 1961. i 2001. godine: industrijska zaposlenost, deagrarizacija i razina obrazovanosti stanovništva. Potom se istražuje međuovisnost zaposlenosti stanovništva u industriji i drugih dvaju oblika socijalne mobilnosti. U tu svrhu izračunati su statistički pokazatelji jakosti veza između navedenih pojava (koeficijent jednostavne linearne korelacije. Rezultati su uputili na postojanje slabe pozitivne korelacije između industrijske zaposlenosti i deagrarizacije u sisačkom kraju, odnosno na srednje jaku korelaciju u petrinjskom kraju. Nešto jača korelacija ustanovljena je između industrijske zaposlenosti i obrazovanosti stanovništva.

  13. Development and applications of reactor noise analysis at Ontario Hydro`s CANDU reactors

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckler, O [Ontario Hydro, Toronto, ON (Canada); Tulett, M V [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1996-12-31

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro`s CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  14. Neuro-fuzzy modelling of hydro unit efficiency

    International Nuclear Information System (INIS)

    Iliev, Atanas; Fushtikj, Vangel

    2003-01-01

    This paper presents neuro-fuzzy method for modeling of the hydro unit efficiency. The proposed method uses the characteristics of the fuzzy systems as universal function approximates, as well the abilities of the neural networks to adopt the parameters of the membership's functions and rules in the consequent part of the developed fuzzy system. Developed method is practically applied for modeling of the efficiency of unit which will be installed in the hydro power plant Kozjak. Comparison of the performance of the derived neuro-fuzzy method with several classical polynomials models is also performed. (Author)

  15. The different modes of hydro-economic analysis (Invited)

    Science.gov (United States)

    Harou, J. J.; Binions, O.; Erfani, T.

    2013-12-01

    In the face of growing water demands, climate change and spatial and temporal water access variability, accurately assessing the economic impacts of proposed water resource management changes is useful. The objective of this project funded by UK Water Industry Research was to present and demonstrate a framework for identifying and using the ';value of water' to enable water utilities and their regulators to make better decisions. A hydro-economic model can help evaluate water management options in terms of their hydrological and economic impact at different locations throughout a catchment over time. In this talk we discuss three modes in which hydro-economic models can be implemented: evaluative, behavioral and prescriptive. In evaluation mode economic water demand and benefit functions are used to post-process water resource management model results to assess the economic impacts (over space and time) of a policy under consideration. In behavioral hydro-economic models users are represented as agents and the economics is used to help predict their actions. In prescriptive mode optimization is used to find the most economically efficient management actions such as allocation patterns or source selection. These three types of hydro-economic analysis are demonstrated on a UK watershed (Great River Ouse) that includes 97 different water abstractors from amongst the public water supply, agriculture, industry and energy plant cooling sectors. The following issues under dry and normal historical conditions were investigated: Supply/demand investment planning, societal cost of environmental flows, water market prices, and scarcity-sensitive charges for water rights. The talk discusses which hydro-economic modeling mode is used to study each of these issues and why; example results are shown and discussed. The topic of how hydro-economic models can be built and deployed effectively is covered along with how existing water utility operational and planning tools can be

  16. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Druce, D. [British Columbia Hydro, Vancouver, BC (Canada)

    2004-07-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs.

  17. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    International Nuclear Information System (INIS)

    Druce, D.

    2004-01-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs

  18. Optimal hydro scheduling and offering strategies considering price uncertainty and risk management

    International Nuclear Information System (INIS)

    Catalão, J.P.S.; Pousinho, H.M.I.; Contreras, J.

    2012-01-01

    Hydro energy represents a priority in the energy policy of Portugal, with the aim of decreasing the dependence on fossil fuels. In this context, optimal hydro scheduling acquires added significance in moving towards a sustainable environment. A mixed-integer nonlinear programming approach is considered to enable optimal hydro scheduling for the short-term time horizon, including the effect of head on power production, start-up costs related to the units, multiple regions of operation, and constraints on discharge variation. As new contributions to the field, market uncertainty is introduced in the model via price scenarios and risk management is included using Conditional Value-at-Risk to limit profit volatility. Moreover, plant scheduling and pool offering by the hydro power producer are simultaneously considered to solve a realistic cascaded hydro system. -- Highlights: ► A mixed-integer nonlinear programming approach is considered for optimal hydro scheduling. ► Market uncertainty is introduced in the model via price scenarios. ► Risk management is included using conditional value-at-risk. ► Plant scheduling and pool offering by the hydro power producer are simultaneously considered. ► A realistic cascaded hydro system is solved.

  19. Revisiting Renewable Energy Map in Indonesia: Seasonal Hydro and Solar Energy Potential for Rural Off-Grid Electrification (Provincial Level

    Directory of Open Access Journals (Sweden)

    Agung Wahyuono Ruri

    2018-01-01

    Full Text Available Regarding the acceleration of renewable energy diffusion in Indonesia as well as achieving the national energy mix target, renewable energy map is essential to provide useful information to build renewable energy system. This work aims at updating the renewable energy potential map, i.e. hydro and solar energy potential, with a revised model based on the global climate data. The renewable energy map is intended to assist the design off-grid system by hydropower plant or photovoltaic system, particularly for rural electrification. Specifically, the hydro energy map enables the stakeholders to determine the suitable on-site hydro energy technology (from pico-hydro, micro-hydro, mini-hydro to large hydropower plant. Meanwhile, the solar energy map depicts not only seasonal solar energy potential but also estimated energy output from photovoltaic system.

  20. B.C. Hydro drops Duke Point

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The abandonment of the proposed natural gas-fired Duke Point Power Project on Vancouver Island was discussed. It was suggested that the continuing appeal process increases the risk that the plant will not be built in time. The news followed a decision by the British Columbia (BC) Court of Appeal to hear an appeal of the project by a number of intervenors. Over $170 million has been spent on the project to date. The decision will impact the BC treasury, as the amount is being deducted from the dividends that BC Hydro would have paid to the government. A coalition of individuals and environmental groups, as well as local industry, are opposed to the plant on the basis of increased greenhouse (GHG) emissions and higher natural gas prices. The project would have required a natural gas pipeline to be built under Georgia Strait. The project was thought necessary due to the deteriorating condition of high voltage direct current cables running under the strait. BC Hydro's fallback plan for the island is load reduction. A new transmission line is also planned

  1. Canadian hydro potential in the North American market

    International Nuclear Information System (INIS)

    Adams, K.

    2002-01-01

    Canada's hydro potential in the North American energy market was discussed. Canada is a net exporter of electricity in North America, and since 1990, has exported an average of 28 Terawatt hours/year to the United States. More than 65 per cent of these exports were generated from hydro power plants. It was emphasized that significant reductions in greenhouse gases can be achieved if Canadian hydroelectricity is substituted for coal power generation. It was also noted that although there may not be enough hydro capacity to meet all of North America's energy requirements, development of new large hydro resources in Canada could help meet the growing demand for electricity in the United States. Hydro can also complement other renewable energy sources such as wind and solar. The factors that will determine if Canadian hydropower will contribute to the energy demand are market mechanisms such as greenhouse gas credit trading systems which provide incentive for renewable energy projects. In addition, the existing infrastructure must be expanded both east and west within Canada and north and south between Canada and the United States. 5 figs

  2. Evaluating a biomass resource: The TVA region-wide biomass resource assessment model

    Energy Technology Data Exchange (ETDEWEB)

    Downing, M.; Graham, R.L. [Oak Ridge National Lab., TN (United States)

    1993-12-31

    The economic and supply structures of short rotation woody crop (SRWC) markets have not been established. Establishing the likely price and supply of SRWC biomass in a region is a complex task because biomass is not an established commodity as are oil, natural gas and coal. In this study we project the cost and supply of short-rotation woody biomass for the TVA region -- a 276 county area that includes all of Tennessee and portions of 10 contiguous states in the southeastern United States. Projected prices and quantities of SRWC are assumed to be a function of the amount and quality of crop and pasture land available in a region, expected SRWC yields and production costs on differing soils and land types, and the profit that could be obtained from current conventional crop production on these same lands. Results include the supply curve of SRWC biomass that is projected to be available from the entire region, the amount and location of crop and pasture land that would be used, and the conventional agricultural crops that would be displaced as a function of SRWC production. Finally, we show the results of sensitivity analysis on the projected cost and supply of SRWC biomass. In particular, we examine the separate impacts of varying SRWC production yields.

  3. TVA-based assessment of visual attentional functions in developmental dyslexia

    Directory of Open Access Journals (Sweden)

    Johanna eBogon

    2014-10-01

    Full Text Available There is an ongoing debate whether an impairment of visual attentional functions constitutes an additional or even an isolated deficit of developmental dyslexia (DD. Especially performance in tasks that require the processing of multiple visual elements in parallel has been reported to be impaired in DD. We review studies that used parameter-based assessment for identifying and quantifying impaired aspect(s of visual attention that underlie this multi-element-processing deficit in DD. These studies used the mathematical framework provided by the ‘theory of visual attention’ (TVA; Bundesen, 1990 to derive quantitative measures of general attentional resources and attentional weighting aspects on the basis of behavioral performance in whole- and partial-report tasks. Based on parameter estimates in children and adults with DD, the reviewed studies support a slowed perceptual processing speed as an underlying primary deficit in DD. Moreover, a reduction in visual short term memory storage capacity seems to present a modulating component, contributing to difficulties in written language processing. Furthermore, comparing the spatial distributions of attentional weights in children and adults suggest that having limited reading and writing skills might impair the development of a slight leftward bias, that is typical for unimpaired adult readers.

  4. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 8: Appendices HYDRO, IRD, LTM, NUTS, PAR, PMR, QAPD, RBP

    International Nuclear Information System (INIS)

    1995-01-01

    Geohydrologic data have been collected in the Los Medanos area at the US Department of Energy's proposed Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico since 1975 as part of a study evaluating the feasibility of storing defense-associated nuclear wastes within the bedded salt of the Salado Formation of Permian age. Drilling and hydrologic testing have identified three principal water-bearing zones above the Salado Formation and one below that could potentially transport wastes to the biosphere if the proposed facility were breached. The zones above the Salado are the contact between the Rustler and Salado Formations and the Culebra and Magenta Dolomite Members of the Rustler Formation of Permian age. The zone below the Salado Formation consists of channel sandstones in the Bell Canyon Formation of the Permian Delaware Mountain Group. Determinations of hydraulic gradients, directions of flow, and hydraulic properties were hindered because of the negligible permeability of the water-bearing zones. Special techniques in drilling, well completion, and hydraulic testing have been developed to determine the hydrologic characteristics of these water-producing zones

  5. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 8: Appendices HYDRO, IRD, LTM, NUTS, PAR, PMR, QAPD, RBP

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-31

    Geohydrologic data have been collected in the Los Medanos area at the US Department of Energy`s proposed Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico since 1975 as part of a study evaluating the feasibility of storing defense-associated nuclear wastes within the bedded salt of the Salado Formation of Permian age. Drilling and hydrologic testing have identified three principal water-bearing zones above the Salado Formation and one below that could potentially transport wastes to the biosphere if the proposed facility were breached. The zones above the Salado are the contact between the Rustler and Salado Formations and the Culebra and Magenta Dolomite Members of the Rustler Formation of Permian age. The zone below the Salado Formation consists of channel sandstones in the Bell Canyon Formation of the Permian Delaware Mountain Group. Determinations of hydraulic gradients, directions of flow, and hydraulic properties were hindered because of the negligible permeability of the water-bearing zones. Special techniques in drilling, well completion, and hydraulic testing have been developed to determine the hydrologic characteristics of these water-producing zones.

  6. Ontario Hydro annual report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    Ontario Hydro is a corporation without share capital created by a special statute of the Province of Ontario in 1906. It now operates under the authority of the Power Corporation Act, R.S.O. 1980, Chapter 384, as amended, with broad powers to generate, supply and deliver electric power throughout the province. It is also authorized to produce and sell steam and hot water as primary products. The Corporation's prime objective is to supply the people of Ontario with electricity at the lowest feasible cost consistent with high safety and quality of service standards. Ontario Hydro's main activity is wholesaling electric power to municipal utilities in urban areas who, in turn, retail it to customers in their service areas. In 1985, approximately 3,166,000 customers were served by Ontario Hydro and the municipal utilities in the province. Ontario Hydro operates 81 hydraulic, fossil and nuclear generating stations and an extensive power grid across Ontario to meet the province's demands for electric energy. Interconnections with other systems place the Corporation in an extensive electrical grid that covers a large segment of the North American continent. Ontario Hydro is a financially self-sustaining corporation. The Province of Ontario guarantees bonds and notes issued to the public by the Corporation

  7. Hydro One 2002 annual report

    International Nuclear Information System (INIS)

    2003-01-01

    Financial information from Hydro One was presented and a review of its 2002 operations was made available for the benefit of shareholders. Hydro One is the largest electricity delivery company in Ontario and one of the largest in North America. It began operation in 1999 after Ontario Hydro restructured its delivery and generation entities. Hydro One now includes power transmission, power distribution and telecom, with transmission and distribution operations representing 99 per cent of its business. This report indicates that in 2002, the utility had strong financial performance with $344 million in net income. The utility met its health and safety targets, and established a customer advisory board to improve customer satisfaction. A layer of management at the executive level was eliminated to stream-line decision-making and enhance productivity. The electricity network was upgraded and maintained through $546 million in capital expenditures. Non-core functions were sold to ensure a better focus on the core business of electricity delivery. This report presents an operations review as well as consolidated financial statements and common share information including the accounts of Hydro One and its share of assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  8. Hydro investment analysis under new market conditions

    Energy Technology Data Exchange (ETDEWEB)

    Doorman, Gerard

    2010-07-01

    Full text: A future energy system with stronger coupling to Europe and with an increased share of non-regulated renewables will lead to increasing variability of the demand faced by the hydro system. In a market based system these variations will be reflected by larger daily price variations, both in the Elspot day ahead market, the Elbas intraday market and in the balancing market. With its unique regulation capabilities, hydro power will be very well positioned to handle these variations. However, existing model concepts for long term hydro scheduling were not developed for this framework, and do not take the new market conditions into account to a sufficient degree. Therefore hydro scheduling tools used for upgrading and investment analysis as well as analysing consequences of new environmental demands need adaptation to a finer temporal resolution, and to perform optimisation under varying constraints and uncertain input data for inflow and electricity prices. Focus is on investment analysis for a river system or power producer. Existing models can be grouped in the long-term (scheduling models with a time horizon up to 5 years) EOPS (Vansimtap), EOPS-ST (SimtapEffekt) and ProdRisk, and the shortterm scheduling models with a typical time horizon up to a few weeks, but focus on 1-2 days (SHOP and ID-SIM). A perfect tool in the present context would combine the properties of the long term stochastic optimisation models with the modelling details of SHOP and/or ID-SIM. However, this is probably not possible and simplifications will be necessary. Some important deficiencies in the present long term models are: Insufficiently realistic plant models in the relevant optimization models; Time delays are not handled; Handing of flexible / state dependent constraints; Handling of ramping constraints; Modelling of the cost of frequent regulations (wear and tear); Reserve markets As a result of these deficiencies the investment analysis does not adequately assess the value

  9. Market Power in Hydro-Thermal Supply

    International Nuclear Information System (INIS)

    Edin, Karl-Axel

    2006-12-01

    Despite having had a deregulated electricity market in Sweden for over ten years we still need to increase our understanding as to how deregulated electricity markets actually work and how possible problems are to be solved. One question that is always in focus is if the competition between generators in the Nordic electricity market really works the way it was intended. Many argue that the concentration in ownership of generation plants already has gone too far. Together with joint ownership in nuclear facilities and barriers for entrance, critics say that this has resulted in higher electricity prices than necessary. In this report different methods to (ex ante) study potential possibilities for generating firms to influence the electricity price (market power) and (ex post) discover possible manipulation through analysing the spot price and other observed factors on the electricity market are analysed. The purpose of the longer underlying paper is to give a comprehensive treatment of the electricity market with storage, i.e. hydro power, with an auction market organisation and to test the models on the Nordic market in order to explore the explanatory power of auction market theory and the theory of contestable market. The main theoretical effort in the paper concerns auction theory with inventories. The paper develops an inter-temporal auction model of a thermal-hydro power market. Parallel to the derivation of the basic equations a numerical model is developed in order to illustrate the results of the model. Section 2 of the present paper summarizes the basic equations (derived in the longer paper) for an inter-temporal auction thermal-hydro market. Section 3 contains the illustrations of solutions to equations for some stylized markets. In section 4 the auction model is tested on the Nordic market

  10. Himalayan hydro on the horizon

    International Nuclear Information System (INIS)

    Sharp, Timothy

    2000-01-01

    The prospects for development of hydro in the Himalayas has been enhanced by privatisation and the urgent need for clean electricity in the north of India. There are various hurdles to be overcome before the projects are likely to move forward in earnest before 2005, and these are mentioned. The demand for electricity in India is said to be enormous. At present, there is much polluting industry along the Himalayas. As throughout the Indian privatisation dilemma, the critical issues for development of Himalayan hydro come down to credible commercial power markets and finance. With regard to finance and administrative changes, the Indian government is carrying out a number of actions and these are itemised. The US is vigorously promoting the development of Himalayan hydro as a key to much needed regional co-operation and the World Bank is supportive

  11. Hybrid Micro-Hydro Power Generation Development in Endau Rompin National Park Johor, Malaysia

    Directory of Open Access Journals (Sweden)

    Yusop Azli

    2017-01-01

    Full Text Available Micro-Hydro electrical power systems are very useful for remote area electrification which does not had supply from the national grid. On the contrary, this area has river streams with high potential for micro-hydro power generation. As such, the UTHM ECO-Hydro Team embarked on a project for erecting a micro-hydro power plant with collaboration with National Education Research Center (NERC, Johor National Park Corporation in Endau Rompin. The existing power generation in this area at present is by using diesel generator gives negative impact on finance and environment in the long run. It supplies power to several including library, offices, open laboratory, chalets and dorms.. At the moment, the micro-hydro system complements the diesel generator, thus becoming a hybrid power generation system.

  12. Fixing hydro - The forgotten renewable

    International Nuclear Information System (INIS)

    Nalder, N.

    1992-01-01

    Since the dawn of civilization, man has captured the energy potential of falling water, from the water wheels in the fertile crescent of ancient times to today's highly sophisticated conventional and pumped storage projects. As we approach the 21st century, electric energy captured from falling water provides 2.0 trillion kilowatt-hours (21.23 quadrillion Btu), roughly 20% of the world's electric energy. Of the 2.56 billion kilowatts of the world's installed electric generating capacity, hydropower accounts for 24%. Between 1980 and 1989, world generation of hydroelectric power rose from 1.7 trillion kWh to 2.0 trillion kWh. As of January 1, 1988, the US has 90.5 million kW of installed hydro capacity - 70.8 million kW of it under license by the Federal Energy Regulatory Commission - with annual generation estimated at just under 300 billion kWh. Hydro's share, which not long ago comprised 13% of the nation's total capacity, now is just a 9% share. The US has the option to choose one or another path for hydro. If policy makers are willing to coast on a cushion of cheap natural gas, they will continue to shun hydro and put obstacles in its path. But if they come to regard hydro as an attractive resource - as they did only recently - economically and environmentally, they will encourage more balance in resource policies. Believing that interest in a balanced national resource portfolio will grow, the author reviews the past and suggests a possible future course of reasonable development for hydro. The article concludes with some suggested principles that will be needed if the appropriate balance is to be found

  13. Strategies for growth of hydro electric power

    International Nuclear Information System (INIS)

    Khera, D.V.

    1998-01-01

    Hydro power on account of its several inherent advantages has a key role to play in the development of long term energy strategies based on diversified and balance use of natural national resources. Our country is fortunate to be endowed with large hydro-electric potential. It is estimated that the hydro potential while fully developed may yield to an installed capacity of 1,50,000 MW. An attempt has been made in this paper to examine and analyse the status and trend of hydro power development, need for accelerated development of hydro power, myths about hydro electric projects, principal causes responsible for scaling down of hydro share in the total installed capacity and strategies which could restore optimum hydro thermal mix. (author)

  14. Ontario Hydro looks at security

    International Nuclear Information System (INIS)

    Green, B.J.; Kee, B.

    1995-01-01

    Ontario Hydro operates 20 CANDU reactors on three different sites. Since 1984, a review of security arrangements on all the sites has taken place on a five-yearly basis. The review process for 1995 is outlined. The three objectives were as follows: to assess current security threats and risks to the stations; to assess the adequacy of the existing programme to protect against current threats; by comparing the security programme against those of comparable entities to establish benchmarks for good practice as a basis for improvements at Ontario Hydro. Valuable insights gained through the review are listed. These could be useful to other utilities. (UK)

  15. Hydro-Quebec's environmental policy

    International Nuclear Information System (INIS)

    1996-10-01

    Hydro-Quebec established a new environmental policy on August 1, 1996. A summary of the policy was presented. According to this policy statement the utility undertakes to recognize the environmental implications of its activities and assumes responsibilities for these implications by integrating them into its corporate decision-making processes. The following general principles and means of implementation have been highlighted: (1) sustainable development, (2) strict, responsible environmental management, (3) environmental research, (4) enhancement of activities and facilities, (5) information, consultation and dialogue, and (6) environmental responsibility of Hydro-Quebec personnel, subsidiaries and business partners

  16. Hydro-Quebec is profitable

    International Nuclear Information System (INIS)

    Poirier, M.

    1997-01-01

    The pros and cons of the potential privatisation of Hydro-Quebec were discussed. A brief review of charges of less than competent management, low profitability and the corporation's recent administrative restructuring was presented. The general thrust of the argument was that Hydro-Quebec plays a crucial role in the economic development of Quebec, it can be made to be more profitable and that for the good of Quebec it should continue as a public corporation under the control of the provincial government

  17. Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2006-01-01

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We use a method based on nonlinear programming (NLP), namely quadratic programming, to consider hydroelectric power generation a function of water discharge and of the head. The method has been applied successfully to solve a test case based on a realistic cascaded hydro system with a negligible computational time requirement and is also applied to show that the role played by reservoirs in the hydro chain do not depend only on their relative position. As a new contribution to earlier studies, which presented reservoir operation rules mainly for medium and long-term planning procedures, we show that the physical data defining hydro chain parameters used in the nonlinear model have an effect on the STHS, implying different optimal storage trajectories for the reservoirs accordingly not only with their position in the hydro chain but also with the new parameterisation defining the data for the hydro system. Moreover, considering head dependency in the hydroelectric power generation, usually neglected for hydro plants with a large storage capacity, provides a better short-term management of the conversion of the potential energy available in the reservoirs into electric energy, which represents a major advantage for the hydroelectric utilities in a competitive electricity market. (author)

  18. Reversible pumped hydro - benefits and challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Torbjoern K.; Walseth, Eve C.

    2010-07-01

    Full text: The Norwegian hydro power system is dominated with high head turbines, Pelton and Francis with high capacity in the reservoirs. Originally they were built for secure energy supply. In the system there are also reversible pump turbine (RPT) plants where in times with spare energy, made it possible to pump water from the lower reservoir to the higher. Again the idea was to secure energy supply, which meant pumping in early autumn to fill the reservoirs for winter. In the recent years, a more active use of the RPT plants has been actualized. The free market made price difference between night and day interesting, hence a more frequent pumping was desirable. In the coming years, new-renewable energy sources will utterly enhance a more active use of the RPT plants. More active use of the RPT plants means more frequent starts and stops, both in pumping and in turbine mode. There are a lot of challenges in adopting a new strategy for operating the machinery. More effective start equipment is required. The machinery will be exposed to more frequent dynamic loads; the turbines will be run at part- and full load. The existing RPT plants are connected to huge reservoirs. That means the RPTs are not only for short sighted power regulations, as many RPT-plants in Europe, but are also capable for a substantial energy production. In Norway, the nature is very suitable for RPT plants, both in connection with existing power plants, were reservoirs and conduits are already established, and standing alone with a minimum of energy production. RPTs are, as a design, a compromise between effective generating and stable as well as effective pumping. Stable pumping often results in very steep flow-speed characteristics when operating as a turbine. When dealing with hydraulic transients these characteristics cause a higher change in flow and torque leading to instability during start-up and possible off-design operation point. The instability slows down the synchronization

  19. Hydro Power Reservoir Aggregation via Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Markus Löschenbrand

    2017-12-01

    Full Text Available Electrical power systems with a high share of hydro power in their generation portfolio tend to display distinct behavior. Low generation cost and the possibility of peak shaving create a high amount of flexibility. However, stochastic influences such as precipitation and external market effects create uncertainty and thus establish a wide range of potential outcomes. Therefore, optimal generation scheduling is a key factor to successful operation of hydro power dominated systems. This paper aims to bridge the gap between scheduling on large-scale (e.g., national and small scale (e.g., a single river basin levels, by applying a multi-objective master/sub-problem framework supported by genetic algorithms. A real-life case study from southern Norway is used to assess the validity of the method and give a proof of concept. The introduced method can be applied to efficiently integrate complex stochastic sub-models into Virtual Power Plants and thus reduce the computational complexity of large-scale models whilst minimizing the loss of information.

  20. Nitrogen doped silicon-carbon multilayer protective coatings on carbon obtained by TVA method

    Science.gov (United States)

    Ciupina, Victor; Vasile, Eugeniu; Porosnicu, Corneliu; Lungu, Cristian P.; Vladoiu, Rodica; Jepu, Ionut; Mandes, Aurelia; Dinca, Virginia; Caraiane, Aureliana; Nicolescu, Virginia; Cupsa, Ovidiu; Dinca, Paul; Zaharia, Agripina

    2017-08-01

    Protective nitrogen doped Si-C multilayer coatings on carbon, used to improve the oxidation resistance of carbon, were obtained by Thermionic Vacuum Arc (TVA) method. The initial carbon layer having a thickness of 100nm has been deposed on a silicon substrate in the absence of nitrogen, and then a 3nm Si thin film to cover carbon layer was deposed. Further, seven Si and C layers were alternatively deposed in the presence of nitrogen ions, each having a thickness of 40nm. In order to form silicon carbide at the interface between silicon and carbon layers, all carbon, silicon and nitrogen ions energy has increased up to 150eV . The characterization of microstructure and electrical properties of as-prepared N-Si-C multilayer structures were done using Transmission Electron Microscopy (TEM, STEM) techniques, Thermal Desorption Spectroscopy (TDS) and electrical measurements. Oxidation protection of carbon is based on the reaction between oxygen and silicon carbide, resulting in SiO2, SiO and CO2, and also by reaction involving N, O and Si, resulting in silicon oxynitride (SiNxOy) with a continuously variable composition, and on the other hand, since nitrogen acts as a trapping barrier for oxygen. To perform electrical measurements, 80% silver filled two-component epoxy-based glue ohmic contacts were attached on the N-Si-C samples. Electrical conductivity was measured in constant current mode. The experimental data show the increase of conductivity with the increase of the nitrogen content. To explain the temperature behavior of electrical conductivity we assumed a thermally activated electric transport mechanism.

  1. Energy supply technologies. Hydro, ocean, wave and tidal

    Energy Technology Data Exchange (ETDEWEB)

    Fenhann, J.; Larsen, Hans [Risoe National Lab. - DTU (Denmark)

    2007-11-15

    This chapter presents an overview of current hydro, ocean, wave and tidal initiatives. Large hydro remains one of the lowest-cost generating technologies, although environmental constraints, resettlement impacts and the limited availability of sites have restricted further growth in many countries. Large hydro supplied 16 % of global electricity in 2004, down from 19 % a decade ago. Large hydro capacity totalled about 720 GW worldwide in 2004 and has grown historically at slightly more than 2 % annually. China installed nearly 8 GW of large hydro in 2004, taking the country to number one in terms of installed capacity (74 GW). With the completion of the Three Gorges Dam, China will add some 18.2 GW of hydro capacity in 2009. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic cost of hydro includes displacements and submergence. Further hydro can improve peak-capacity management. Ocean currents, some of which runs close to European coasts, carry a lot of kinetic energy. Part of this energy can be captured by sub-marine windmills and converted into electricity. These are more compact than the wind turbines used on land, simply because water is much denser than air. The main European countries with useful current power potential are France and the UK. Ocean tides are driven by the gravitational pull of the moon. With one high tide every 12 hours, a tidal power plant can operate for only four or five hours per cycle, so power from a single plant is intermittent. A suitably-designed tidal plant can, however, operate as a pimped storage system, using electricity during periods of low demand to store energy that can be recovered later. The only large, modern example of a tidal power plant is the 240 MW La Rance plant, built in France in the 1960s, which represents 91 % of the world tidal power capacity. Wave energy can be seen as

  2. Ontario Hydro statistical yearbook 1990

    International Nuclear Information System (INIS)

    1990-01-01

    Ontario Hydro was created in 1906 by a special statute of the Province of Ontario. It is a financially self-sustaining corporation without share capital. The yearbook is a compilation of financial data detailed by financial statements and sales and revenue figures for the year 1990. It is broken down by municipalities served in Ontario

  3. The hydro energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Vachey, C.

    2000-05-01

    This paper is a first approach of the hydro energy energy. It presents the principle and the applications of this energy source. It proposes recommendations on the sizing and the cost estimation of an installation and the environmental impacts of this energy. (A.L.B.)

  4. Ontario Hydro annual report 1986

    International Nuclear Information System (INIS)

    1987-04-01

    Ontario Hydro's annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics

  5. Ontario Hydro statistical yearbook 1990

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-12-31

    Ontario Hydro was created in 1906 by a special statute of the Province of Ontario. It is a financially self-sustaining corporation without share capital. The yearbook is a compilation of financial data detailed by financial statements and sales and revenue figures for the year 1990. It is broken down by municipalities served in Ontario.

  6. Engineering hydro's future

    International Nuclear Information System (INIS)

    Anderson, J.L.

    1992-01-01

    In this challenging hydropower market, hydropower engineering services are in high demand. The number of new hydropower projects entering the pipeline may have slowed in recent years but that does not mean work is not being done. Independent developers, utilities and municipalities are carrying out a considerable amount of hydropower activity. Whatever the work involves - preliminary planning, licensing and relicensing, environmental mitigation, plant rehabilitation or new-plant startup - engineering firms are finding a brisk market for their services. The complexity of the regulatory framework makes hydropower facility and other water resource work more important then ever. Executives of three engineering firms - Acres International, Harza Engineering and Black and Veatch - active in these areas discuss their views on the future of the hydropower engineering market

  7. Detailed feasibility study of a small-hydro power plant in Zerni on the municipal drinking water supply; Etude detaillee de faisabilite pour l'installation d'une petite centrale sur l'adduction d'eau potable de Zerni - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Reul, B. [MHyLab, Montcherand (Switzerland); Perruchoud, A. [SierreEnergie SA, Sierre (Switzerland)

    2009-02-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the municipal drinking water supply of the city of Sierre, Switzerland. The installation is to be made at the site of a new reservoir in Zerni. The report presents details on the hydrological data and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as are the applicable water regulations. The electricity production expected is discussed, as is the economic viability of the project.

  8. [Ontario Hydro]. Corporate performance report, 1994

    International Nuclear Information System (INIS)

    1995-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in 1993, beginning with overall results in such areas as customer service, environmental stewardship, human resources, and finance. This is followed by reports from the Generation Business Group, Customer Services Group, Corporate Business Group, General Counsel and Secretary, Ontario Hydro Audit, Strategic Planning, Environment and Communication Group, and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix includes summary financial statements

  9. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  10. An overview on small hydro in Brazil

    International Nuclear Information System (INIS)

    Filho, G.T.

    2008-01-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km 2 . It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  11. An overview on small hydro in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Filho, G.T. [Federal Univ. of Itajuba (Brazil). National Reference Centre for Small Hydro

    2008-07-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km{sup 2}. It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  12. Hydro-Quebec annual report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    An overview is presented of the activities of Hydro-Quebec for the year ended December 31, 1993, as well as its financial status. Export sales of electricity to other Canadian provinces and the USA are reported. Research programs and demonstration projects are described, as well as the utility's international activities. Environmental and economic considerations for the province are presented. Financial data includes total sales, sales by sector, export sales, and rate changes. A financial statement is included. In 1993, total sales volume was 152.1 TWh, or 7.5 TWh more than in 1992, for a total sales revenue of $7,004 million, an increase of 3.5% over 1992. Sales in Quebec increased 5 TWh, with nearly all of this increase coming from the industrial sector. Exports outside of Quebec totalled 15 TWh, or 20% more than in 1992. The largest increase in exports was in the form of short-term sales to the USA. Expenditures in 1993 were $3,761 million, only slightly more than in 1992. Facilities commissioned in 1993 included the Brisay power plant, two of six units at the Laforge-1 plant, and the north portion of the 12th transmission line from the LaGrande complex. Total installed capacity of the Hydro-Quebec system reached 29,131 MW, and total power produced was 131.6 TWh. Total length of transmission and distribution lines in 1993 reached 29,869 km and 100,908 km respectively. 9 figs., 17 tabs

  13. The Nothuesli small hydro project; Wasserkraftwerk Nothuesli, Gonzenbaechli - Vorprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Balachandran, S.; Jorde, K.

    2008-07-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  14. Economic impact of Hydro-Quebec's nuclear activities

    International Nuclear Information System (INIS)

    Emard, R.

    1994-01-01

    Gentilly 2 nuclear power plant has benefited the regions of Becancour and Trois Rivieres, with spin-off at the provincial level. Gentilly 2 is Hydro Quebec's only nuclear plant. Its 675 MW provide nearly 3% of Hydro Quebec's production. Over 664 permanent jobs were created, 70% of them highly specialized and multi-skilled. In 1993, out of C$99 spent, 57.3 were for wages, 16.3 for equipment and supplies (including fuel and heavy water), 18 for professional services provided by AECL and others, and the remainder included fees, permits, contract work, and miscellaneous. Gentilly 2 has fostered technological development and inventions which are used at other CANDU stations. 7 ills

  15. Restoring coastal wetlands that were ditched for mosquito control: a preliminary assessment of hydro-leveling as a restoration technique

    Science.gov (United States)

    Smith, Thomas J.; Tiling, Ginger; Leasure, Pamela S.

    2007-01-01

    The wetlands surrounding Tampa Bay, Florida were extensively ditched for mosquito control in the 1950s. Spoil from ditch construction was placed adjacent to the wetlands ditches creating mound-like features (spoil-mounds). These mounds represent a loss of 14% of the wetland area in Tampa Bay. Spoil mounds interfere with tidal flow and are locations for non-native plants to colonize (e.g., Schinus terebinthifolius). Removal of the spoil mounds to eliminate exotic plants, restore native vegetation, and re-establish natural hydrology is a restoration priority for environmental managers. Hydro-leveling, a new technique, was tested in a mangrove forest restoration project in 2004. Hydro-leveling uses a high pressure stream of water to wash sediment from the spoil mound into the adjacent wetland and ditch. To assess the effectiveness of this technique, we conducted vegetation surveys in areas that were hydro-leveled and in non-hydro-leveled areas 3 years post-project. Adult Schinus were reduced but not eliminated from hydro-leveled mounds. Schinus seedlings however were absent from hydro-leveled sites. Colonization by native species was sparse. Mangrove seedlings were essentially absent (≈2 m−2) from the centers of hydro-leveled mounds and were in low density on their edges (17 m−2) in comparison to surrounding mangrove forests (105 m−2). Hydro-leveling resulted in mortality of mangroves adjacent to the mounds being leveled. This was probably caused by burial of pneumatophores during the hydro-leveling process. For hydro-leveling to be a useful and successful restoration technique several requirements must be met. Spoil mounds must be lowered to the level of the surrounding wetlands. Spoil must be distributed further into the adjacent wetland to prevent burial of nearby native vegetation. Finally, native species may need to be planted on hydro-leveled areas to speed up the re-vegetation process.

  16. Current status and future developments of small and micro hydro in southern Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2012-05-01

    Full Text Available -1 Current status and future developments of small and micro hydro in southern Africa Wim Jonker Klunne Council for Scientific and Industrial Research (CSIR) PO Box 395 Pretoria 0001 South Africa Introduction Small and micro hydropower... are renewable energy technologies that have large potential in the south- ern African region, both for grid and off-grid applications. Within the region a good understanding exists on the potential for large scale hydro with a substantial number of plants...

  17. Studying the cumulative environmental effects of Hydro-Quebec's installations plan

    International Nuclear Information System (INIS)

    Dubeau, D.

    1992-01-01

    The study of the cumulative environmental effects that have been integrated with technical and economic analyses include mercury, land use in the region (territory), natural landscapes, cultural heritages, forest dynamics, regional economies and ways of life. Requests and petitions from the public about Hydro-Quebec projects fall into four categories: welfare of communities, impact on the land, environmental responsibility and preservation of plant and animal species. The cooperation of all concerned is necessary for Hydro-Quebec's developments. (author)

  18. Role of pump hydro in electric power systems

    Science.gov (United States)

    Bessa, R.; Moreira, C.; Silva, B.; Filipe, J.; Fulgêncio, N.

    2017-04-01

    This paper provides an overview of the expected role that variable speed hydro power plants can have in future electric power systems characterized by a massive integration of highly variable sources. Therefore, it is discussed the development of a methodology for optimising the operation of hydropower plants under increasing contribution from new renewable energy sources, addressing the participation of a hydropower plant with variable speed pumping in reserve markets. Complementarily, it is also discussed the active role variable speed generators can have in the provision of advanced frequency regulation services.

  19. Environmental-impact assessment of hydro-power in Egypt

    International Nuclear Information System (INIS)

    Rashad, S.M.; Ismail, M.A.

    2000-01-01

    The environmental impact of energy production and use with the associated emissions of greenhouse gases, particularly CO 2 , has created much attention and growing concern at both national and international levels. In Egypt, efforts have been directed to incorporate the environment-protection issues within the overall planning of the energy sector, as appropriate to its national commitment and its techno-economic considerations. Over the past decade, 1985-1995, hydro-power had contributed between 28 and 22% of the total energy produced by Egyptian power-plants, while the contribution of the hydro capacity was between 32.4 and 21.5%. Many studies have been carried out on the impacts of the Aswan High Dam on various aspects of the environment. An objective evaluation of the Dam, based on 25 years of operational data, indicated that it has overall been positive even though it has contributed to some environmental problems. These problems, however, are significantly less than most people originally expected. This paper deals with the review and analysis of the detrimental effects of hydro-power in Egypt. An evaluation will be given of the emissions of greenhouse gases from the whole hydro-chain. (Author)

  20. Unbalance influence on the rotating assembly dynamics of a hydro

    Science.gov (United States)

    Jurcu, M.; Pădureanu, I.; Campian, C. V.; Haţiegan, C.

    2018-01-01

    The dynamics of the rotating parts of a hydro is characterized by the dynamic interaction between the rotor, the stator and the working fluid in order to operate the hydro. The main factors influencing the dynamics of the rotating parts of a hydro are: rotor unbalance, unbalanced magnetic pull, shaft misalignment and hydraulic flow regime. Rotor unbalanced is one of the most common factors influencing the dynamic stability of the rotating parts of a hydro. The unbalanced is determined by: uneven distribution of rotating masses, displacement of parts in the rotor during rotation, inhomogeneity of rotor component materials, expansion of the rotor due to heating, and rising speed during the transient discharge of the load. The mechanical imbalance of a rotor can lead to important forces, responsible for the vibration of the machine, which ultimately leads to a shorter operating time. Even a low unbalance can lead, in the case of high speed machines, to major unbalance forces that cause significant damage to the equipment. The unbalance forces cause additional vibrations in the bearings as well as in the foundation plate. To avoid these vibrations, it is necessary in the first stage to balance the static rotor in the construction plant and then to a dynamic rotation balancing.

  1. Architecture at Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  2. Ontario Hydro Research Division, 1980

    International Nuclear Information System (INIS)

    The work of the Research Division of Ontario Hydro provides technical and scientific support for the engineering and operation of a power system that includes hydraulic, fossil-fired, and nuclear generation. It also relates to the transmission and distribution of electricity and to the need to help customers use electricity with safety and economy. Among the examples of projects given are qualification of CANDU heat transport system components, pressure tube replacement, steam generator integrity, testing for earthquake resistance, and radioactive waste disposal

  3. Assessing the role of large hydro in Canada's electricity future

    International Nuclear Information System (INIS)

    Lee Pochih

    1992-01-01

    Electric power in Canada was first generated by steam in the 1880s. The use of hydroelectricity spread rapidly due to abundant water resources and the nationalization of power companies by the provinces; by 1920, 97% of Canadian electricity production came from hydroelectric plants. Thermal generation became competitive by the 1960s, when most of the best hydro sites had been developed, and nuclear generation also started gaining a share of the market. By 1991, hydroelectricity's share of Canadian power production had declined to around 60%. Hydroelectric power has long been used as an instrument of Canadian industrial policy. Given the amount and importance of utility capital expenditures, it was recognized that hydropower development could serve such policy objectives as job creation, industrial development, and macroeconomic stabilization. Creation of provincially owned utilities led to construction of large hydroelectric projects, notably in Quebec, British Columbia, Manitoba, and Newfoundland. The 20 largest hydroelectric power plants in Canada have a total installed capacity of 35,704 MW, representing ca 59% of Canada's total 1991 hydro capacity. The construction of such large projects is not expected to proceed as quickly as in the past because of environmental concerns. However, a number of factors favor continuation of development of hydro resources: a remaining potential estimated at ca 44,000 MW; simplification of electricity export regulations; more stringent air pollution standards that favor non-polluting energy sources; and a moratorium on nuclear power plants in Ontario. 4 tabs

  4. Toronto Hydro annual report, 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Toronto Hydro is the electric utility serving about 219,000 customers in Toronto, Ontario. In 1992, the utility purchased 9.6 billion kWh of electricity from Ontario Hydro, down 3.6% from 1990. Energy sales totalled 9.2 billion kWh, down 4.1% from 1990. Retail electricity rates increased an average of 6.7% in 1992, in spite of an increase in Ontario Hydro's wholesale rate by 8.2%, due to better than anticipated financial results and cost-control measures. The decline in electricity purchases and sales are attributed to economic factors, which also contributed to an increase in the utility's provision for bad debts. The third year of a 13.8-kV conversion project was completed in 1992; this project is converting the existing 4 kV distribution system to the higher voltage since maintenance and repair of the existing system is costly and the equipment is becoming less reliable. New construction, refurbishing, and modernization of equipment were performed at a number of substations. Other improvements in 1992 are reported in the areas of management and engineering systems, personnel policies, work safety, and energy management. Financial statements are included. 11 figs., 4 tabs

  5. A study on the hydrotreating of coal hydro liquefaction residue and its kinetics

    Energy Technology Data Exchange (ETDEWEB)

    Huang, J.; Lu, X.; Zhang, D.; Gao, J. [Department of Chemical Engineering for Energy Resources, East China University of Science and Technology, Shanghai (China)

    2010-09-15

    Hydro-conversion of coal hydro liquefaction residue obtained from a 6 t/day pilot plant of Shenhua Group in Shanghai was carried out under the hydrotreating condition. The coal hydro liquefaction residue and its product were extracted in sequence with n-hexane, toluene and tetrahydrofuran in a Soxhlet apparatus. The n-hexane soluble fractions increased with the increase of reaction temperature and time. Its amount increased from 14.14% to a maximum of 40.86% under the conditions of 470 {sup o}C and 30 min, which meant that moderate extension of coal residence time in the coal hydro liquefaction reactor is beneficial to the increase of oil yield. A 4-lumped kinetic model of coal hydro liquefaction residue hydro-conversion was performed using solubility-based lumped fractions. In the model, the tetrahydrofuran insoluble fractions were classified into two parts: easily reactive part and unreactive part. The kinetic parameters were estimated by a fourth-order Runge-Kutta method and a nonlinear least squares method, and the apparent activation energies were calculated according to the Arrhenius Equation. A large quantity of total catalyst consisting of remained liquefaction catalyst, part of the mineral from raw coal and additive Fe-based catalyst could considerably reduce the apparent activation energy of hydro-conversion for the toluene insoluble/tetrahydrofuran insoluble fractions to 36.79 kJ-mol{sup -1}. The calculated values of the model coincided well with the experimental values. (authors)

  6. Good prospects for Portuguese small hydro industry

    International Nuclear Information System (INIS)

    Betamio de Almeida, A.; Serranho, H.

    2000-01-01

    The article outlines the history of hydro in Portugal and discusses the current position of small-scale hydro with particular reference to the Portuguese Small Hydro Association (AMPH). Encouraged by legislation, and the Valoren community programme (which defined investment incentives), many new small hydro projects sprang up in Portugal in the 1990s. In some areas of Portugal the water levels were higher than the urban centres where the water is required: how the problems of integrating power and water were addressed is described. The integration of power and irrigation schemes is also mentioned. In the wake of great expansion in the Portuguese hydro industry, there was a sharp reduction (in 1995-6) and the reasons for that are listed. The 1999 tariff was such that it is likely that small hydro will provide 3.8% of the electric power consumed nationally by 2010

  7. Hydro-Quebec proudly celebrates 50 years of service

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    The history of the electric utility Hydro-Quebec is reviewed from its creation in 1944 as the Hydroelectric Commission of Quebec. The utility inherited an installed capacity of 696 MW and it first went about standardizing electricity supply conditions and establishing equal rates in the Montreal area. It began major construction projects in the mid-1950s with the Bersimis and Carillon hydroelectric plants. By 1962, installed capacity reached 3,657 MW. In 1963, Hydro-Quebec bought 10 private electricity distribution companies, 45 cooperatives, and a series of private or municipal systems. In 1965, the utility commissioned the world's first 735-kV transmission line. In 1967, Hydro-Quebec opened its research institute, and another laboratory specializing in electrotechnologies was opened in 1987. The 1970s were noted for the James Bay hydroelectric projects, the development of which was eventually governed by the landmark James Bay and Northern Quebec Agreement of 1975. Electricity exports greatly expanded in the 1970s and early 1980s as larger hydroelectric projects came on stream. Challenges of the 1990s include service quality, environmental issues, energy efficiency, and conservation. Hydro-Quebec's Energy Efficiency Project has a target of annual savings of 9.3 TWh by the year 2000. Energy efficiency and power system upgrading are priorities for serving future customer needs. Hydro-Quebec continues to promote hydroelectric power as the cheapest, most environmentally benign form of energy and future generating stations in progress include phase II of the LaGrande complex (to be completed 1996). 2 figs

  8. [Ontario Hydro International Inc.]. Annual report 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Ontario Hydro International Inc. is the international representative of Ontario Hydro. OHII operates as a global utility that markets Ontario Hydro's services and products. Its mission is to be the leader in energy efficiency and sustainable development in the international marketplace. This report describes the year's activities in the following areas: Energy management and environment, hydroelectric generation, nuclear products and services, fossil generation, grid (transmission) business, utility management, Asia Power Group Inc. The document also includes financial highlights and international and customer contracts

  9. BC hydro: Annual report, 1991-1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The third largest electric utility in Canada, B.C. Hydro services almost 1.3 million customers in an area containing over 92 per cent of British Columbia's population. B.C. Hydro's mission is to generate, transmit and distribute electricity. This annual report covers the business and financial performance of B.C. Hydro, and financial statistics.

  10. [Ontario Hydro]. Corporate performance report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values established in the approved corporate financial plan and work program budget. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in mid-1993, beginning with overall results in such areas as customer satisfaction, electricity sales, human resources, and environmental protection. This is followed by reports from the Electricity Group (supply, generation, transmission), the Energy Services and Environment Group (load saved and shifted, non-utility generation, retail distribution), and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix contains summary financial statements

  11. 76 FR 67175 - Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp...

    Science.gov (United States)

    2011-10-31

    ...; 14149-000] Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp... Lock Hydro Friends Fund XXXVI (Lock Hydro) and on April 11, 2011, Arkansas Electric Cooperative Corp... & Dam No. 3, as directed by the Corps. Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090...

  12. The power of commitment : Newfoundland and Labrador Hydro 2000 annual report

    International Nuclear Information System (INIS)

    2000-01-01

    A consolidated review of the operations of Newfoundland and Labrador Hydro (Hydro) was presented with particular focus on energy production, energy sales, the Avalon Transmission upgrade, development of the Granite Canal and Hydro's dam safety program. Hydro reported a 4.5 per cent increase in gross energy production at their generating plants throughout the system. Production from hydro sources also increased by 4.5 per cent to a total of 5,032 GWh. Thermal production from the Holyrood generating facility also increased slightly to 1,040 GWh. Production for peaking and emergency requirements from gas turbines and diesel plants dropped to 0.6 GWh. In 2000, about 83 per cent of all the energy supplied to their customers came from hydro sources. Total energy sales were up 4.6 per cent during 2000. This annual report presented the company's financial performance, executive changes, rural rate inquiry, and reorganization. Financial statements included a thorough review and analysis of financial transactions, the auditor's report, and the customary notes to the consolidated financial statement including balance sheets, assets, liabilities and capital. tabs., figs

  13. 78 FR 56224 - Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3401-049] Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption 1. By documentation filed July 8, 2013 and supplemented... Hydro-WM, LLC. The project is located on the Rockfish River in Nelson County, Virginia. The transfer of...

  14. Mixed-integer nonlinear approach for the optimal scheduling of a head-dependent hydro chain

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-08-15

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We propose a novel mixed-integer nonlinear programming (MINLP) approach, considering hydroelectric power generation as a nonlinear function of water discharge and of the head. As a new contribution to earlier studies, we model the on-off behavior of the hydro plants using integer variables, in order to avoid water discharges at forbidden areas. Thus, an enhanced STHS is provided due to the more realistic modeling presented in this paper. Our approach has been applied successfully to solve a test case based on one of the Portuguese cascaded hydro systems with a negligible computational time requirement. (author)

  15. A case study of small hydro and grid extension for rural electrification alternatives and complementarities

    International Nuclear Information System (INIS)

    Tebicke, H.L.; Mariam, H.G.

    1990-01-01

    This paper reports that rural electrification in Eastern and Southern African Countries (ESAC) has so far been based largely on stand-alone diesel electric generating plant or on the extension of high-voltage transmission grids fed by large hydro and/or thermal electric generating stations. The alternative of furnishing supply at modest investment and competitive cost from a nearby small- hydro plant has rarely been considered in those countries of the sub-region that have ample hydro-power resources. All countries in the sub-region (except Angola) import petroleum and/or petroleum product supplies, as well as all hardware for electricity supply and utilization. As a result, in most countries an acute shortage of foreign exchange severely hampers implementation of rural electrification schemes. This should turn attention increasingly to strategies which are less capital-intensive and less dependent on foreign exchange, such as small-hydro plants, where the resource is located near to rural demand. Increasing the local content of small-hydro project implementation has paid off in recent years, considerably reducing costs in a number of Asian and Latin American projects. Local contributions have taken the form of resource assessment at a particular site, design, construction works, and fabrication of relatively simple components of power plant such as hydraulic equipment, low pressure penstocks and gates, as well as simpler types of turbines (e.g., the Banki type). Inadequacy of indigenous technical capacity to make similar local contributions in the ESAC has meant that the few recent small-hydro projects have relied on importing both expertise and equipment. The high costs resulting have frequently fueled arguments against pursuit of small-hydro projects

  16. Nuclear power at Ontario Hydro

    International Nuclear Information System (INIS)

    Tapon, F.; Osborne, T.J.

    1980-01-01

    This case study shows that the diffusion of nuclear power in the electric public utility industry in Canada approximates the logistic growth curve, in agreement with previous results on technological innovation diffusion in the U.S. private sector. Many of the economic variables that affect this diffusion in the private sectors in the U.S. and Canada are also significant in the public sector in Canada. Too few utilities have adopted nuclear technology to permit using regression analysis to study the effect of environmental and regulatory factors on the growth of Ontario Hydro. Thus, cost-benefit analysis for each province might be more effective

  17. 75 FR 18572 - Supplemental Environmental Impact Statement for Sequoyah Nuclear Plant Units 1 and 2 License...

    Science.gov (United States)

    2010-04-12

    ... TENNESSEE VALLEY AUTHORITY Supplemental Environmental Impact Statement for Sequoyah Nuclear Plant... National Environmental Policy Act. TVA will prepare a supplemental environmental impact statement (SEIS) to update information in the 1974 Final Environmental Statement for Sequoyah Nuclear Plant Units 1 and 2...

  18. Hydro makes the most of driftwood

    Energy Technology Data Exchange (ETDEWEB)

    Shinjo, Takahisa [Electric Power Development Company, Tokyo (Japan)

    2001-05-01

    The Electric Power Development Company (EPDC), which owns and operates 58 hydro power plants and controls 40 reservoirs, is reaping benefits from the driftwood collected from the reservoirs. Large amounts of driftwood, litter and illegally dumped wastes are removed from the company's reservoirs every year. The driftwood was previously incinerated but a new processing system is now used which is more cost-effective and has less impact on the environment. EPDC has installed carbonisation kilns and chipping systems at a number of its sites. The end-products (charcoal, wood vinegar and chips) are sold to offset the costs of driftwood processing. The properties of driftwood charcoal make it suitable for a number of applications (eg absorption, deodorisation, soil improvement and humidity control), while pulverised charcoal is sold as a fuel, as a deodorant for drinking water and for humidity control sheets. The wood vinegar has been used as a preservative, in insecticides and to promote plant growth. Refining the wood vinegar has allowed EPDC to develop cosmetics and face creams. Chips are sold to a plywood manufacturer or used as an organic fertiliser.

  19. Development of Dalaelven hydro power scheme in Sweden

    International Nuclear Information System (INIS)

    Kokko, Voitto; Hjerthen, Peter; Ingfaelt, Hans; Loewen, Karl-Erik; Sjoegren, Arne

    2015-01-01

    The Dalaelven hydro scheme is located in central Sweden. Fortum has in the scheme 50 dams and 35 hydro power plants producing 4 TWh energy with a capacity of 970 MW. The main reservoirs are Lake Siljan and Traengsletsjoen with Traengslet dam, the highest earth-filled dam in Sweden. Development of the hydro scheme started 1878 with construction of four power plants for industry until 1930. From 1931 to 1974 15 power plants were built for increasing electricity consumption. De-regulation of the energy market in 1990's and EU environmental targets in 2000's resulted in the rehabilitation of ten power plants between 1990 and 2014 with increased annual energy production of 377 GWh (29%) and capacity 124 MW (59%). This energy decreases the annual CO 2 emissions with 125918 tons in comparison to production of the same amount of energy by coal. In several cases the rehabilitation was made in new power houses, allowing the development of the layout and technology of civil structures, and use of state-of-art equipment. Sweden uses the green certificate system, and 235 GWh of the energy received this certificate. Other environmental benefits come from use of the environmentally friendly Kaplan turbines and construction of some new fish pass. There are further plans to increase the spillway capacity of Traengslet dam and to rehabilitate eight power plant units. The possibilities of obtaining the Environmental licences for the rehabilitations has became challenging in the past years and green certificates are nowadays agreed only for increased energy. (authors)

  20. Usability of a theory of visual attention (TVA) for parameter-based measurement of attention I: evidence from normal subjects

    DEFF Research Database (Denmark)

    Finke, Kathrin; Bublak, Peter; Krummenacher, Joseph

    2005-01-01

    four separable attentional components: processing speed, working memory storage capacity, spatial distribution of attention, and top-down control. A number of studies (Duncan et al., 1999; Habekost & Bundesen, 2003; Peers et al., 2005) have already demonstrated the clinical relevance......The present study investigated the usability of whole and partial report of briefly displayed letter arrays as a diagnostic tool for the assessment of attentional functions. The tool is based on Bundesen's (1990, 1998, 2002; Bundesen et al., 2005) theory of visual attention (TVA), which assumes...... of these parameters. The present study was designed to examine whether (a) a shortened procedure bears sufficient accuracy and reliability, (b) whether the procedures reveal attentional constructs with clinical relevance, and (c) whether the mathematically independent parameters are also empirically independent...

  1. Development of Hydro-Mechanical Deep Drawing

    DEFF Research Database (Denmark)

    Zhang, Shi-Hong; Danckert, Joachim

    1998-01-01

    The hydro-mechanical deep-drawing process is reviewed in this article. The process principles and features are introduced and the developments of the hydro-mechanical deep-drawing process in process performances, in theory and in numerical simulation are described. The applications are summarized....... Some other related hydraulic forming processes are also dealt with as a comparison....

  2. Modelling the economics of combined wind/hydro/diesel power systems

    International Nuclear Information System (INIS)

    Sinha, A.

    1993-01-01

    A model that stimulates the performance and economics of a combined wind/hydro/diesel plant with pumped storage has been developed. It is applied to a hypothetical site to demonstrate how a subset of the cheapest configuration of plant sizes may be identified, illustrating in particular the trade-off between the hydro storage capacity and the wind turbine penetration. It seems that, with the wind and water regimes employed, pumped storage is unlikely to have significant benefits, but may be beneficial in areas without natural inflow, in which case the reservoir is used as a store for excess wind output. (author)

  3. NRC regulation of TVA. Hearings before the Subcommittee on Oversight and Investigations of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, Second Session, February 26, June 11, and October 1, 1986

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    Nuclear Regulatory Commissioners, Tennessee Valley Authority (TVA) chairman Charles Dean, and members of both agencies, as well as representatives of review groups testified at a hearing on the performance of regulators in overseeing TVA's nuclear programs, all of which are inoperative. The witnesses reviewed certification, licensing, and inspection processes which reflect poor management on the part of NRC and indifference to TVA. Of major concern was the sacrifice of safety for expeditious construction. The hearing took place over three days in February, June, and October of 1986. Material submitted for the record follows the testimony of the 19 witnesses

  4. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  5. Realisation of a small-scale hydro-power plant between two drinking water reservoirs in the municipality of Vira Gambarogno - Feasibility study; Realizzazione di una microcentrale idroelettrica sulla condotta di adduzione tra il serbatoio Monti di Fosano e il serbatoio Fosano. Programma piccole centrali idrauliche. Studio di fattibilita

    Energy Technology Data Exchange (ETDEWEB)

    Mutti, M.

    2009-02-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the drinking water supply in the municipality of Vira Gambarogno, southern Switzerland. The old conduit connecting two drinking water reservoirs has to be replaced. The elevation difference of 260 m is favorable to the installation of a turbine near the lower reservoir. The report presents details on the hydrological data and the dimensioning of the installation. Several variants are considered, which also include the possible reconstruction of the lower reservoir and/or an increased water flow rate from the springs. The electricity production expected is discussed, as is the economic viability of the project.

  6. Study of cavitation in hydro turbines. A review

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Pardeep; Saini, R.P. [Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee 247667 (India)

    2010-01-15

    Reaction turbines basically Francis turbines and propeller/Kaplan turbines are suitable for medium and low head hydropower sites. The management of the small hydropower plants is an important factor, for achieving higher efficiency of hydro turbines with time. Turbines show declined performance after few years of operation, as they get severely damaged due to various reasons. One of the important reasons is erosive wear of the turbines due to cavitation. Reaction turbines, however are more prone to cavitation especially Francis turbines where a zone in the operating range is seriously affected by cavitation and considered as forbidden zone. Cavitation is a phenomenon which manifests itself in the pitting of the metallic surfaces of turbine parts because of the formation of cavities. In the present paper, studies undertaken in this field by several investigators have been discussed extensively. Based on literature survey various aspects related to cavitation in hydro turbines, different causes for the declined performance and efficiency of the hydro turbines and suitable remedial measures suggested by various investigators have been discussed. (author)

  7. In the spotlight: New hydro development in North America

    International Nuclear Information System (INIS)

    Barnes, M.J.

    1993-01-01

    1992 was a year of progress for many segments of the hydropower industry as developers worked to bring new projects on line. This industry overview features several of these projects and offers a preview of 1993 activity. The only operating privately owned hydroelectric project in Texas. The largest hydro plant in the province of Manitoba. The world's largest submersible hydroturbine-generator. These projects and others-completed and placed in service in 1992-can claim a special place in the history books. For each of the 31 hydro projects in North America that began operating in 1992, there's a unique story to tell. Each called upon the time, talent, commitment, ingenuity, and perseverance of those involved in their development. In aggregate, these projects contribute nearly 3,800 MW of clean, renewable electrical capacity that can be used efficiently and cost-effectively to help meet the power demands of customers in the US and Canada. Utilities, state agencies, municipalities, and independent power developers played roles in developing new hydro in 1992. We offer a sampling of their work to illustrate progress made in the past year

  8. Naturalization of landscaped parkland at Ontario Hydro's Nanticoke generating station

    International Nuclear Information System (INIS)

    McKenna, G.R.

    1998-01-01

    The implementation of a program for the naturalization of Nanticoke Park, a 30 hectare area located on the property of Ontario Hydro's Nanticoke Generating Station was discussed. The station, which is located in southern Ontario very near to noted wildlife areas, is the largest coal-fired generating station in North America. Naturalization of Nanticoke Park began with passive naturalization of interior areas. An active naturalization program involving four to five hectare size areas annually was begun in 1997, to be completed over a five -year period. This presentation described the site preparation, planting methods, post-planting tending methods, survival assessment of planted areas, and scientific research initiatives including mulch trials with zebra mussel shells to increase soil moisture. The lessons learned from the two year experiment in determining the optimum planting strategy and methods were described. 7 refs., 1 tab

  9. Hydro operational restrictions forum: Licensee workshop summary. Final report

    International Nuclear Information System (INIS)

    Ebrahim, S.; Monahan, C.K.; Pistor, B.; West, A.

    1998-08-01

    In spite of producing no atmospheric pollutants, hydroelectric power plants often go unrecognized as a unique provider of clean, efficient, low-cost energy. A concerted effort is needed to ensure that these attributes are fully accounted for when considering the uses and benefits of available water resources. Relicensing reviews and other regulatory activities associated with continued operation of hydro generation projects have drawn increased attention to hydro resources. This attention has typically resulted in imposition of conditions having a substantial cost impact without, necessarily, reflecting a full appreciation of the resource's benefits and attributes. With the extensive countrywide effort in relicensing and regulation, there is an opportunity to collect and compile lessons learned. This is particularly true with respect to preferred practices, technologies, and techniques applicable to required studies and mitigation measures. Such compilation will enable the industry and related stakeholders to improve quality and effectiveness while reducing costs of relicensing and mitigation for continued hydro operations. As a technology leader for the industry, EPRI is in a unique position to identify and document these techniques and practices. This report comprises the proceedings of the hydro licensees workshop. Fifteen licensee representatives with recent or current involvement in the relicensing process gathered at this workshop and shared their experiences, both good and bad. Support was strong among attendees for EPRI's effort to collect and compile these, along with the experiences of others, into a guidebook of accepted practices. Initial workshop findings were used in the second workshop to solicit buy-in from agencies and NGOs to the need for--as well as proposed scope of--a compendium of preferred practices

  10. Multiple objective optimization of hydro-thermal systems using Ritz's method

    Directory of Open Access Journals (Sweden)

    Arnáu L. Bayón

    1999-01-01

    Full Text Available This paper examines the applicability of the Ritz method to multi-objective optimization of hydro-thermal systems. The algorithm proposed is aimed to minimize an objective functional that incorporates the cost of energy losses, the conventional fuel cost and the production of atmospheric emissions such as NO x and SO 2 caused by the operation of fossil-fueled thermal generation. The formulation includes a general layout of hydro-plants that may form multi-chains of reservoir network. Time-delays are included and the electric network is considered by using the active power balance equation. The volume of water discharge for each hydro-plant is a given constant amount from the optimization interval. The generic minimization algorithm, which is not difficult to construct on the basis of the Ritz method, has certain advantages in comparison with the conventional methods.

  11. User experience with HydroHelp programs

    Energy Technology Data Exchange (ETDEWEB)

    Verner, J.S. [Brookfield Power, Gatineau, PQ (Canada)

    2009-07-01

    Advances in the field of geographical information systems (GIS) have simplified the process of finding suitable sites for new hydroelectric projects. However, estimating the construction cost remains a challenge. The HydroHelp program is a cost evaluation program developed specifically to determine if a project will be economically feasible. The program is made up of 4 programs, depending on the type of turbine suitable for the site. Once a turbine selection is made, users can choose the program according to Kaplan, Impulse or Francis turbines. Users must rely on GIS, since the program requires a thorough understanding of the site geology and topography. Knowledge of hydroelectric plants is also necessary in order to obtain a credible construction cost. This paper demonstrated the capacity and flexibility of the software along with its different functions and available options. A detailed cost breakdown can be obtained along with an energy estimate and project specifications. In addition, the software can be used to optimize the project through different options by changing the facility's layout in terms of the type of dam, spillway, conduit length and diameter, turbine type and flood level. 17 figs.

  12. Post Chernobyl safety review at Ontario Hydro

    International Nuclear Information System (INIS)

    Frescura, G.M.; Luxat, J.C.; Jobe, C.

    1991-01-01

    It is generally recognized that the Chernobyl Unit 4 accident did not reveal any new phenomena which had not been previously identified in safety analyses. However, the accident provided a tragic reminder of the potential consequences of reactivity initiated accidents (RIAs) and stimulated nuclear plant operators to review their safety analyses, operating procedures and various operational and management aspects of nuclear safety. Concerning Ontario Hydro, the review of the accident performed by the corporate body responsible for nuclear safety policy and by the Atomic Energy Control Board (the Regulatory Body) led to a number of specific recommendations for further action by various design, analysis and operation groups. These recommendations are very comprehensive in terms of reactor safety issues considered. The general conclusion of the various studies carried out in response to the recommendations, is that the CANDU safety design and the procedures in place to identify and mitigate the consequences of accidents are adequate. Improvements to the reliability of the Pickering NGSA shutdown system and to some aspects of safety management and staff training, although not essential, are possible and would be pursued. In support of this conclusion, the paper describes some of the studies that were carried out and discusses the findings. The first part of the paper deals with safety design aspects. While the second is concerned with operational aspects

  13. Hydro or the waltz of managers

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    A critique of current management and personnel problems at Hydro-Quebec was presented. With 20,000 employees and some of the world's greatest hydroelectric projects to its credit, Hydro-Quebec has historically been a source of great pride for its employees and Quebec's society. However, recent problems related to management, bureaucratization and communications within the corporation have led to important moral problems within the workforce. Management of the corporation under the newly appointed president, Andre Caille, the issue of profitability and competitiveness, the worsening morale among employees and the relationship between Hydro-Quebec and the provincial government were the principal topics discussed

  14. 77 FR 77070 - Black Bear Hydro Partners, LLC;

    Science.gov (United States)

    2012-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2727-086] Black Bear Hydro...: October 24, 2012. d. Submitted By: Black Bear Hydro Partners, LLC (Black Bear Hydro). e. Name of Project... designating Black Bear Hydro as the Commission's non-federal representative for carrying out informal...

  15. Testing of mobile surveillance robot at a nuclear power plant

    International Nuclear Information System (INIS)

    White, J.R.; Harvey, H.W.; Farnstrom, K.A.

    1987-01-01

    In-plant testing of a mobile surveillance robot (SURBOT) was performed at the Browns Ferry Nuclear Plant by TVA personnel. The results verified that SURBOT can be used for remote surveillance in 54 separate controlled radiation rooms at the plant. High-quality color video, audio, and other data are collected, digitized by an on-board computer, and transmitted through a cable to the control console for real-time display and videotaping. TVA projects that the use of SURBOT for surveillance during plant operation will produce annual savings of about 100 person-rem radiation exposure and $200,000 in operating costs. Based on the successful results of this program, REMOTEC is now commercializing the SURBOT technology on both wheeled and tracked mobile robots for use in nuclear power plants and other hazardous environments

  16. Hydro-Quebec looks to integrated development of Quebec and its regions

    International Nuclear Information System (INIS)

    Bissonnette, Lise

    1995-01-01

    Hydro-Quebec's telecommunication system, the largest private telecommunications network in Canada, was discussed. The network was set up to assure safety and efficiency of the power plants and energy transmission and distribution lines. By the year 2000 Hydro-Quebec will need electronic links with all its industrial, commercial and residential customers in order to guarantee competitive service and full customer satisfaction. Investments of about one half billion dollars have been earmarked to boost the capacity of their telecommunications grid and meet steadily growing needs. As a result of the very difficult negotiations to resolve the native land claims issue, Hydro-Quebec was forced to adapt a strict and far-reaching environmental policy, which is now beginning to pay off not only in environmental terms, but also in terms of goodwill among actual and prospective customers. As a result of these huge infrastructure projects Hydro Quebec will be in a position to guarantee people access to energy at a price that is among the lowest in the world. Although demand growth could slow, demand itself will not wane. As part of this overall strategy, Hydro-Quebec plans to defer large-scale projects, instead, for the foreseeable future it will concentrate on smaller power plants, some of which could be built on rivers that have already been tamed

  17. Atmospheric emissions : hydro-electricity versus other options

    International Nuclear Information System (INIS)

    Chamberland, A.; Belanger, C.; Gagnon, L.

    1996-01-01

    One of the great environmental advantage offered by hydro-electricity in northern or temperate climates includes reduced atmospheric emissions. While natural gas plants, from an environmental viewpoint, are thought to be the best fossil fuel option, they emit 18 times more greenhouse gases, at least 60 times more sulfur dioxide and hundreds of times more nitrogen oxides than do hydro-electric systems. The relative SO 2 and greenhouse gas emissions from energy systems in Canada were outlined, and their environmental impacts were described. At the same time, mention was made of other environmental pollutants, such as acid rain, photochemical smog, and particulates that continue to have major impacts on the environment, but were displaced as the focus of attention by greenhouse gases. A study was conducted to determine the effects of extreme biomass decomposition and greenhouse gas emissions from reservoirs. The study showed that at depths of more than 10 centimeters below water surface, organic matter does not contribute to greenhouse gas production, even at 20 degrees C. It was demonstrated that even when maximum biomass decomposition is assumed, a modern natural gas plant would emit 14 times more green house gases than a hydroelectric plant of comparable capacity. 13 refs., 4 tabs., 3 figs

  18. Hydro-power: a long history, a bright future

    Energy Technology Data Exchange (ETDEWEB)

    Deudney, D

    1981-07-01

    A brief history of the spread of hydro-power in the world was given. Tables showing hydro-power potential and use, and the % electricity from hydro-power for 13 countries were included along with a graph showing % hydro-power operating, planned and under construction by region. The need for committed and farsighted political leadership for future development and the possibility of hydro production reaching 4 to 6 times its present level were discussed.

  19. Micro Hydro-Electric Energy Generation- An Overview

    OpenAIRE

    S. O. Anaza; M. S. Abdulazeez; Y. A. Yisah; Y. O. Yusuf; B. U. Salawu; S. U. Momoh

    2017-01-01

    Energy is required now more than ever due to population growth, industrialization and modernization. Challenges such as carbon dioxide (CO2) emissions and depletion of conventional source of energy necessitate for renewable sources, of which hydro energy seems to be the most predictable. Micro-hydro which is hydro energy in a “small” scale provides electricity to small communities by converting hydro energy into electrical energy. This paper is an overview of micro-hydro system by reviewing s...

  20. Sudar vozila u vlasništvu istog leasing društva i problem treće osobe iz AO osiguranja

    OpenAIRE

    Radionov, Nikoleta; Padovan, Adriana Vincenca

    2012-01-01

    U radu se razmatraju pravni odnosi koji nastaju u slučaju sudara dvaju (ili više) vozila u vlasništvu istog leasing društva (slučaj leasing – leasing). Prema uvriježenoj praksi na domaćem tržištu osiguranja, u takvim slučajevima dolazi do isključenja iz osiguranja šteta na vozilu temeljem osiguranja automobilske odgovornosti (AO), s obzirom na to da su vozila u vlasništvu istog leasing društva koje je i jedini osiguranik po policama AO oba (ili više) vozila sudionika nezgode. Primatelj leasin...

  1. Hydro energetic inventory study from Chapecozinho river

    International Nuclear Information System (INIS)

    Pimenta, S.C.; Sureck, M.A.A.; Nascimento, P.R.; Kawasaki, M.; Silva Felipe, R. da.

    1990-01-01

    The Hydro energetic Inventory Study in Chapecozinho River Basin, Brazil is described, comparing the proposed results in 1979 with the actual review in 1989. An analysis for solution the socio-economic and environment problems is also presented. (author)

  2. Emerging Market Attractiveness Index for hydro IPPs

    OpenAIRE

    Weaver, Tyson John

    2013-01-01

    This article addresses two primary commercial themes that affect the future development of the industry. 1. What are the most attractive future emerging markets for hydropower? 2. What parameters are utilized by international hydro IPPs to determine market attractiveness?

  3. Mobile units to hydro geochemistry characterization

    International Nuclear Information System (INIS)

    Gomez, P.; Martinez, B.; Turrero, M.J.

    1994-01-01

    This report shows the mobile units for hydro geochemical studies. The authors analyze the work of mobile unit and the cars that conform the unit: Sampling car and analysis car: The sampling and equipment are took into account as well

  4. Thai-Myanmar joint hydro schemes

    Energy Technology Data Exchange (ETDEWEB)

    Boonpiraks, S [Electricity Generating Authority of Thailand, Nonthaburi (Thailand)

    1992-10-01

    A brief overview is presented here of planned cooperation between Thailand and Myanmar to harness the hydro resources available along the border of the two countries. This would reduce their dependence on thermal generation. (author).

  5. Ontario hydro radioactive material transportation field guide

    International Nuclear Information System (INIS)

    Howe, W.

    1987-01-01

    The recent introduction of both the AECB Transport Packaging of Radioactive Material Regulations and Transport Canada's Transportation of Dangerous Goods Regulations have significantly altered the requirements for transporting radioactive material in Canada. Extensive additional training as well as certification of several hundred Ontario Hydro employees has been necessary to ensure compliance with the additional and revised regulatory requirements. To assist in the training of personnel, an 'active' corporate Ontario Hydro Field Guide for Radioactive Material Transport document has been developed and published. The contents of this Field Guide identify current Ontario Hydro equipment and procedures as well as the updated relevant regulatory requirements within Canada. In addition, to satisfying Ontario Hydro requirements for this type of information over two thousand of these Field Guides have been provided to key emergency response personnel throughout the province of Ontario to assist in their transportation accident response training

  6. Coanda hydro intake screen testing and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Howarth, J.

    2001-07-01

    The objective of this project has been to evaluate the effectiveness, suitability and cost benefit of the Aquashear Coanda effect, maintenance free intake screen for use in small hydro system intakes. (author)

  7. Response to the Petition to Object to the TVA Paradise Fossil Plant, Drakesboro, Kentucky, Title V Operating Permit

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  8. Workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. Part I

    International Nuclear Information System (INIS)

    1997-01-01

    The publication has been set up as proceedings of the workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. The proceedings consist of the following chapters: (1) BOT schemes as financial model of hydro power projects; (2) Application of pumped storage plants in the control of the Slovak power system and the possibility of pumped storage plant Ipel exploitation towards the year 2010; (3) Use of hydro energetic potential of streams from the aspects of nature conservation on the example of north Slovakia; (4) Ecological aspects of the hydro power industry and possible means to improve ecological conditions of water reservoirs; (5) Preparation and realization of HPP Zilina; (6) Freudenau HPP. ecological measures and groundwater management; (7) Present state of hydro power development in Austria

  9. Annual report 1993 (Ontario Hydro, Toronto)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Ontario Hydro`s prime objective is to supply the people of Ontario with electricity at cost while maintaining high standards of safety and service. The annual report presents energy efficiency and competitiveness, operations in review, the environmental performance of the Corporation, the future, and choices for a sustainable future. A financial review and analysis is also provided, along with an auditor`s report and financial statements.

  10. Energy balance of hydro-aggregate with Pelton water turbine

    International Nuclear Information System (INIS)

    Obretenov, V.

    2005-01-01

    One of the major tasks in the field of hydraulic power engineering refers to machines and equipment modernization in the hydropower plants and pumped storage power plants commissioned more than 20 years ago. The increase of hydraulic units operation efficiency will allow in a number of cases to substantially reduce the specific water consumption and to drive the output of electric energy up. In these cases it is crucial to find out the operational efficiency of individual system elements and to precisely focus the modernization endeavours on such elements where the energy losses go beyond all admissible limits. Besides, the determination of the energy losses in the hydro energy turbo system will allow valid defining of hydraulic units operational scope. This work treats the methods of balance study of a hydraulic unit with Peiton water turbine. The experimental results of the balance study of Belmeken pumped storage power plant hydraulic unit No 5 under turbine operational mode are presented

  11. Effet de l'extrait hydro-éthanolique des feuilles de Trilepisium ...

    African Journals Online (AJOL)

    apparition de plusieurs complications du diabète (hypertension artérielle, cataracte, insuffisance rénale,…). C'est ainsi que, la présente étude a été entreprise pour évaluer l'effet antioxydant de l'extrait hydro-éthanolique de cette plante chez les ...

  12. Ontario Hydro's experience in implementing on-the-job training for chemical technicians

    International Nuclear Information System (INIS)

    Cooper, G.A.

    1996-01-01

    Since 1989, Ontario Hydro Nuclear has been developing and implementing formalized On-the-Job Training for qualifying its nuclear power plant chemical laboratory staff. This paper focuses on the process followed in designing, developing and implementing this training, with emphasis on the strengths and weaknesses of the program. 7 refs, 3 figs

  13. Energy generated for you : Newfoundland and Labrador Hydro 2003 annual report

    International Nuclear Information System (INIS)

    2004-01-01

    This report provides a consolidated review of the operations of Newfoundland and Labrador Hydro (Hydro) with focus on energy production, energy sales, and environmental commitment. The utility, a Crown Corporation owned by the Province of Newfoundland and Labrador, generates, transmits and distributes electricity to utility, industrial and residential customers. It is the parent company of the Hydro Group of Companies which includes Newfoundland and Labrador Hydro, Churchill Falls Corp. Ltd., Lower Churchill Development Corp. Ltd., Gull Island Power Co. Ltd., and Twin Falls Power Co. Ltd.. The installed generating capacity of the Hydro Group of Companies is the fourth largest in Canada. The generating assets include 10 operating hydroelectric plants, 1 oil-fired plant, 4 gas turbines, 28 diesel plants, and the Churchill Falls Hydroelectric generating station. The utility also maintains 4,800 km of transmission lines and more than 3,600 km of lower voltage distribution lines. The utility is isolated from the North American grid. Energy sales in 2003 were one per cent above 2002. The Holyrood thermal generating station had a gross production of 2061 GWh in 2003, an 18 per cent reduction from 2002. The 40 MW Granite Canal Hydroelectric generating station was completed in 2003. The utility also purchased electricity from Corner Brook Pulp and Paper and the Exploits River Partnership in order to meet the demand for capacity and energy on the island. The Hydro Group's net income decreased by 24 per cent in 2003, while there was a 3 per cent increase in revenue. Earnings are expected to be higher in 2004 due to a projected increase in rates. This annual report presented the company's financial performance, executive changes, rural rate inquiry, and reorganization. Financial statements included a thorough review and analysis of financial transactions, the auditor's report, and the customary notes to the consolidated financial statement including balance sheets, assets

  14. Manitoba Hydro 1998 progress report

    International Nuclear Information System (INIS)

    1998-11-01

    Manitoba Hydro has four commitments: 1) they will integrate climate change management into their plans and operations, 2) between 1991 and 2012 they will reduce their greenhouse gas emissions in excess of 6% below 1990 levels, 3) they anticipate that their greenhouse gas production will be in excess of 40% below their 1990 levels by 2010-11, and 4) they have the potential to make a greater contribution to national and international environmental and economic efforts by developing additional hydroelectric energy. The performance to date in implementing their strategy since 1990 includes: the 1330 megawatt Limestone Generating Station came into full production in 1992, which has increased electricity output without additional greenhouse gas emissions; four coal fueled generating units were removed from service at Brandon Generating Station in 1996, reducing coal generating capacity; seven communities previously served have been connected to the province's provincial grid, reducing the emissions from diesel generators; demand-side energy initiatives resulted in a saving of 45 megawatts since 1990, and supply-side initiatives, 152 megawatts; and net exports have increased significantly, from 2,296 megawatt hours in 1990 to 13,888 megawatt hours in 1997-98, which displaces energy that would otherwise have been produced at fossil-fueled generating stations. tabs

  15. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  16. Nitrogen doped silicon-carbon multilayer protective coatings on carbon obtained by thermionic vacuum arc (TVA) method

    Science.gov (United States)

    Ciupinǎ, Victor; Vasile, Eugeniu; Porosnicu, Corneliu; Vladoiu, Rodica; Mandes, Aurelia; Dinca, Virginia; Nicolescu, Virginia; Manu, Radu; Dinca, Paul; Zaharia, Agripina

    2018-02-01

    To obtain protective nitrogen doped Si-C multilayer coatings on carbon, used to improve the oxidation resistance of carbon, was used TVA method. The initial carbon layer has been deposed on a silicon substrate in the absence of nitrogen, and then a 3nm Si thin film to cover carbon layer was deposed. Further, seven Si and C layers were alternatively deposed in the presence of nitrogen ions. In order to form silicon carbide at the interface between silicon and carbon layers, all carbon, silicon and nitrogen ions energy has increased up to 150eV. The characterization of microstructure and electrical properties of as-prepared N-Si-C multilayer structures were done using Transmission Electron Microscopy (TEM, STEM) techniques, Thermal Desorption Spectroscopy (TDS) and electrical measurements. The retention of oxygen in the protective layer of N-Si-C is due to the following phenomena: (a) The reaction between oxygen and silicon carbide resulting in silicon oxide and carbon dioxide; (b) The reaction involving oxygen, nitrogen and silicon resulting silicon oxinitride with a variable composition; (c) Nitrogen acts as a trapping barrier for oxygen. To perform electrical measurements, ohmic contacts were attached on the N-Si-C samples. Electrical conductivity was measured in constant current mode. To explain the temperature behavior of electrical conductivity we assumed a thermally activated electric transport mechanism.

  17. Multiple objective optimization of hydro-thermal systems using Ritz's method

    Directory of Open Access Journals (Sweden)

    L. Bayón Arnáu

    2000-01-01

    Full Text Available This paper examines the applicability of the Ritz method to multi-objective optimization of hydro-thermal systems. The algorithm proposed is aimed to minimize an objective functional that incorporates the cost of energy losses, the conventional fuel cost and the production of atmospheric emissions such as NOx and SO2 caused by the operation of fossil-fueled thermal generation. The formulation includes a general layout of hydro-plants that may form multi-chains of reservoir network.

  18. 76 FR 55723 - Final Supplemental Environmental Impact Statement, Sequoyah Nuclear Plant Units 1 and 2 License...

    Science.gov (United States)

    2011-09-08

    ...-basis accident or severe accident is minor, and that the results of such accidents continue to be... the Fukushima accident is unlikely to occur at any TVA plant. Nonetheless, the effort has resulted in... the Fukushima Dai-ichi Accident, concluded that continued operation and continued licensing activities...

  19. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    International Nuclear Information System (INIS)

    Wiebe, P.A.

    1994-01-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs

  20. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    Energy Technology Data Exchange (ETDEWEB)

    Wiebe, P.A

    1994-06-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs.

  1. Small hydro in Ukraine: To invest or not to invest?

    Energy Technology Data Exchange (ETDEWEB)

    Loechen, Liv Arntzen

    2011-07-01

    The vast and unexploited renewable energy potential and the introduction of green tariffs in 2009 have made Ukraine an attractive location for investors within the renewable energy sector. The Green Tariff system offers developers and investors the highest feed-in tariffs in Eastern Europe, and thus far covers alternative energy production from biomass, biogas, wind power plants and hydropower plants. Ukraine has a history in both large- and small hydro production. Whereas the potential of the country's big rivers is now to a great extent exploited, this is not the case for the smaller watercourses. Ukraine is well endowed with small rivers, approximately 60,000 of which can be classified as 'very small'. Most of these are located in the western part of the country, near the Carpathian Mountains. However, despite the natural potential, foreign investors should be aware of the potential risks and hurdles. The country has a huge problem with corruption, and the process of obtaining licenses is not straight forward. On the whole, it can be worthwhile exploring the possibilities of small hydro production in Ukraine for those who can deal with a high level of risk and uncertainty. If not, one would be better advised to look for investment locations elsewhere.(auth)

  2. A comparison of the aquatic impacts of large hydro and small hydro projects

    Science.gov (United States)

    Taylor, Lara A.

    The expansion of small hydro development in British Columbia has raised concerns surrounding the effects of these projects, and the provincial government's decision to proceed with Site C has brought attention to the impacts of large hydro. Together, these decisions highlight that there are impacts associated with all energy development. My study examines the aquatic effects of large and small hydro projects using two case study sites: Site C and the Upper Harrison Water Power Project. I first determine the aquatic effects of each of the case study sites. Next, I use existing literature and benefits transfer to determine the monetary value of these effects. My results suggest that, with mitigation, small hydro projects have less of an effect on the environment than a large hydro project per unit of electricity. I also describe the implications of my study in the context of current British Columbia energy policy. Keywords: hydropower; aquatic effects. Subject Terms: environmental impact assessment; benefits transfer.

  3. Short-term hydro-thermal scheduling using particle swarm optimization method

    International Nuclear Information System (INIS)

    Yu, Binghui; Yuan, Xiaohui; Wang, Jinwen

    2007-01-01

    The approaches based on different particle swarm optimization (PSO) techniques are applied to solve the short-term hydro-thermal scheduling problem. In the proposed methods, many constraints of the hydro-thermal system, such as power balance, water balance, reservoir volume limits and the operation limits of hydro and thermal plants, are considered. The feasibility of the proposed algorithm is demonstrated through an example system, and the results are compared with the results of a genetic algorithm and evolutionary programming approaches. The experimental results show that all the PSO algorithms have the ability to achieve nearly global solutions, but a local version of PSO with inertia weight appears to be the best amongst all the PSOs in terms of high quality solution

  4. Public safety for BC Hydro's dams and powerhouse

    Energy Technology Data Exchange (ETDEWEB)

    Cattanach, D. [BC Hydro, Burnaby, BC (Canada). Emergency Preparedness Security and Public Safety

    2009-07-01

    This presentation reviewed public safety and historical practices at British Columbia (BC) Hydro. Historically, visitors were guided to safe locations at their facilities by visitor centres and public use management areas. Fences and booms were used to protect visitors from the more dangerous areas around the facility. This presentation also described the features of the safety management plans that BC Hydro has in place for each of its 41 facilities. The safety management plans are approved by the plant managers; they have common controls such as fences and signs; and there are excellent maps defining the danger areas. New risks that were identified were also presented. The next steps for BC Hydro include test driving the draft Canadian Dam Association guidelines for the Aberfeldie Dam; a new powerhouse to reduce overtopping of the dam during the spring; and continuing with public safety hazards and controls such as bow-ties. figs.

  5. The contribution of small hydro power stations to the electricity generation in Greece: Technical and economic considerations

    International Nuclear Information System (INIS)

    Kaldellis, J.K.

    2007-01-01

    Hydropower is the most widely used renewable energy source worldwide, contributing almost with 18.5% to the fulfillment of the planet electricity generation. However, most locations in Europe appropriate for the installation of large hydro power stations have already been exploited. Furthermore, there is a significant local communities' opposition towards new large power stations; hence, small hydro power stations remain one of the most attractive opportunities for further utilization of the available hydro potential. Greece and more precisely the country's mainland possesses a significant hydro-power potential which is up to now only partially exploited. In parallel, a large number of private investors have officially expressed their interest in creating small hydro power stations throughout the country, encouraged by the significant Greek State subsidy opportunities for renewable energy applications. However, up to now a relatively small number of projects have been realized, mainly due to decision-making problems, like the administrative bureaucracy, the absence of a rational national water resources management plan and the over-sizing of the proposed installations. Certainly, if the above problems are suitably treated, small hydro-power plants can be proved considerably profitable investments, contributing also remarkably to the national electricity balance and replacing heavy polluting lignite and imported oil. In the context of the above interesting issues, the present study reviews in detail the existing situation of small hydropower plants in Greece and investigates their future prospects as far as the energy, economic and environmental contribution are concerned

  6. Dynamics analysis of the fast-slow hydro-turbine governing system with different time-scale coupling

    Science.gov (United States)

    Zhang, Hao; Chen, Diyi; Wu, Changzhi; Wang, Xiangyu

    2018-01-01

    Multi-time scales modeling of hydro-turbine governing system is crucial in precise modeling of hydropower plant and provides support for the stability analysis of the system. Considering the inertia and response time of the hydraulic servo system, the hydro-turbine governing system is transformed into the fast-slow hydro-turbine governing system. The effects of the time-scale on the dynamical behavior of the system are analyzed and the fast-slow dynamical behaviors of the system are investigated with different time-scale. Furthermore, the theoretical analysis of the stable regions is presented. The influences of the time-scale on the stable region are analyzed by simulation. The simulation results prove the correctness of the theoretical analysis. More importantly, the methods and results of this paper provide a perspective to multi-time scales modeling of hydro-turbine governing system and contribute to the optimization analysis and control of the system.

  7. Report on results of R and D of coal liquefaction technology under Sunshine Project in fiscal 1981. Development of direct hydro-liquefaction plant (research on liquefaction by bench scale equipment, and research on solid-liquid separation method); 1981 nendo sekitan ekika gijutsu no kenkyu kaihatsu, chokusetsu suiten ekika plant no kaihatsu seika hokokusho. Bench scale sochi ni yoru ekika kenkyu, koeki bunriho ni kansuru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    This paper explains the results of development of direct hydro-liquefaction plant under the Sunshine Project in fiscal 1981. As element studies for supplementing and supporting a 2.4 t/day PDU (process development unit), in the research using a 0.1 t/day bench scale continuous type equipment of fiscal 1981, a hydrogenation experiment was conducted for anthracene oil and also, an examination was made on the reaction conditions of Taiheiyo coal and Horonai coal, as well as on the catalyst and reaction ratio and on the product material distribution. A medium oil equalizing test was performed using Taiheiyo coal in order to obtain knowledge about equalized medium oil. Liquefaction characteristics in the preheating process and reaction process were elucidated by means of a semi-batch device. Comparative studies were made between domestic and overseas coals, in coal properties and liquefaction characteristics using a shaking type autoclave. The performance of iron-sulfur based catalysts was also examined. In the research on a solid-liquid separation method, the basic properties of coal liquefied crude oil were measured such as general properties, solid grading distribution and distillation characteristics, with the basic tests carried out for standing separation, filtrating separation and centrifuging separation, providing selected materials of the solid-liquid separation method suitable for the crude oil produced by the direct hydro-liquefaction method. In addition, studies were conducted on the use of residual oil generated by solid-liquid separation, providing knowledge of the viscosity and thermal cracking. (NEDO)

  8. Climate impact on BC Hydro's water resources

    International Nuclear Information System (INIS)

    Smith, D.; Rodenhuis, D.

    2008-01-01

    BC Hydro like many other hydro utilities has used the historical record of weather and runoff as the standard description the variability and uncertainty of the key weather drivers for its operation and planning studies. It has been conveniently assumed that this historical record is or has been statistically stationary and therefore is assumed to represent the future characteristics of climatic drivers on our system. This assumption is obviously no longer justifiable. To address the characterisation of future weather, BC Hydro has a multi-year a directed research program with the Pacific Climate Impacts Consortium to evaluate the impacts of climate change on the water resources that BC Hydro manages for hydropower generation and other uses. The objective of this program is to derive climate change adjusted meteorologic and hydrologic sequences suitable for use in system operations and planning studies. These climate-adjusted sequences then can be used to test system sensitivity to climate change scenarios relative to the baseline of the historical record. This paper describes BC Hydro's research program and the results achieved so far. (author)

  9. BC Hydro shops for GHG offsets

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    BC Hydro is reported to have offered to purchase one million tonnes of carbon dioxide reductions in Canada's Greenhouse Gas Emissions Reduction Trading program (GERT). The program uses a baseline and credit system, where emitters purchase measurable quantities of site-specific GHG reductions. Since mid-1998, the program registered five bilateral trades and seven offers to sell. BC Hydro's recent offer is the first offer to buy. BC Hydro has made the offer to buy in expectation of the introduction of the start of the Kyoto Protocol reductions, and expects to be in the game for some time to come if it is to meet its obligations under the Kyoto Protocol. Preference will be given to projects located in Canada, but BC Hydro will consider reductions created anywhere in the world. The financial range of a single trade is between $50,000 and $1 million. (GHG offsets are currently trading in North America for between $.50 and $3.00 Cdn per metric tonne of carbon dioxide equivalent.) At present, offsets are selling at a heavily discounted price because of the uncertainty that investments made now will be credited against future regulations curbing emitters. Consequently, buying now while prices are low, may lead to sizable benefits later, depending on the actual regulations when they are promulgated. Trading now will also give BC Hydro greater credibility and assurance to have its voice heard when discussions about emissions trading and the implementation of emission trading rules reaches the serious stage

  10. Training of nuclear power plant personnel in Canada

    International Nuclear Information System (INIS)

    Tennant, D.

    1993-01-01

    All of the utilities, Ontario Hydro, Hydro Quebec and New Brunswick Power, operating Nuclear Power Plants in Canada have Training Centres which provide training for all of their plant personnel whose job activities could affect plant and personnel safety. This report points out the methods used for training, which generally conform to that described by the IAEA as a Systematic Approach to Training (SAT)

  11. Collision data involving hydro-carbon molecules

    International Nuclear Information System (INIS)

    Tawara, H.; Itikawa, Y.; Nishimura, H.; Tanaka, H.; Nakamura, Y.

    1990-07-01

    Hydro-carbon molecules are abundantly produced when graphites are used as internal wall materials of hydrogen plasmas and strongly influence properties of low temperature plasmas near the edges as well as those of high temperature plasmas at the center. In this report, following simple description of the production mechanisms of hydro-carbon molecules under the interactions between graphite and hydrogen plasma, the present status of collision data for hydro-carbon molecules by electron impact is discussed and the relevant data are summarized in a series of figures and tables. It should also be noted that, in addition to fusion plasmas, these hydrocarbon data compiled here are quite useful in other applications such as plasma chemistry and material processing. (author)

  12. The development of small-hydro in China; Le developpement de la petite hydraulique en Chine

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, X. [United Nations Environment Programme, Riso (Denmark); Pan, J. [Chinese Academy of Social Sciences (China). Research Centre for Economic Development

    2007-04-15

    Small hydro is a renewable source of energy that is economically and technically viable. This article described China's investment in small-scale hydroelectric power plants in 1,600 remote communities. Seventy per cent of China's small hydro power stations are concentrated in remote impoverished communities. These power stations provide electricity to 300 million people in China, where half of the territories, one third of the districts and towns, and one quarter of the population depend primarily on this energy source for their electricity needs. The first power station was built in the province of Yunnan in 1912, but the real development of small hydro occurred after 1950, and can be divided into three phases. Phase 1 occurred before 1980 when small hydro power stations concentrated on providing electricity for lighting in rural areas as well as for transforming agriculture and irrigation. For many decades following the foundation of the Republic of China, rural areas did not have access to electricity or had serious shortages of electricity. In order to ensure electricity in isolated and remote areas, the Chinese government requested that local authorities build and exploit small hydro where conditions were favourable, and this while respecting water resources. Phase 2 occurred between 1980s and 1990s, with a focus on improving the performance of small hydro power stations to include electricity provisions for local enterprises. During phase 2, small hydro became a tool for dynamic rural development for farmers to increase their revenues. The latest phase in small hydro development has also helped reduce poverty and develop local economies, but in addition, it plays a role in the long term protection of ecosystems, the environment and rural modernization. Today 660,000 people work for small power stations and most are employed locally. Replacing firewood with electricity has saved 130,000 hectares of forested land and helped protect ecosystems. Small

  13. BC Hydro triple bottom line report 2002

    International Nuclear Information System (INIS)

    Anon

    2002-08-01

    British Columbia Hydro (BC Hydro) published this document which measures the environmental, social and economic performance of the company. It is a complement to BC Hydro's 2002 Annual Report. The report was prepared to better understand the company's business in terms of its commitment to being an environmentally, socially, and economically responsible company (the three bottom lines). BC Hydro proved its ability to integrate the three bottom lines in decision making processes by carefully examining the environmental, social and economical impacts of programs such as Power Smart, Green and Alternative Energy, and Water Use Planning. All indicators point to BC Hydro achieving its commitment of providing a minimum of 10 per cent of new demand through 2010 with new green energy sources. Water Use Plans were developed for hydroelectric generating stations, and they should all be in place by 2003. Efficiencies realised through the Power Smart program offset the increases in greenhouse gas associated with increased energy demand. Juvenile sturgeon raised in a hatchery were released into the Columbia River in May 2002. The completion of a 40-kilometre trail on the Sunshine Coast was helped by a financial contribution from BC Hydro in the amount of 23,000 dollars. Safety improvements were implemented at eight facilities, such as dam remediation, dam surveillance and instrumentation updates. Scholarships were awarded across the province, along with additional donations to non-profit organizations. Co-op positions were provided for 150 students. Internal energy efficiency programs were successful. Planning is under way for significant maintenance work and equipment replacement projects as the transmission and distribution infrastructure ages. The number of reported indicators was expanded this year. In turn, they were aligned with the revised Global Reporting Initiative (GRI) guidelines. tabs

  14. Alexela ostab Hydro Texaco tanklaketi / Gert D. Hankewitz

    Index Scriptorium Estoniae

    Hankewitz, Gert D.

    2006-01-01

    Kütusefirma Alexela Oil teatas, et ostab tanklaketi Hydro Texaco kõik Balti riikide tanklad. Diagramm: Alexela ja Hydro Texaco majandusnäitajad. Vt. samas: Statoili juht: ühinemine turul muutusi ei too

  15. B.C. Hydro : 1997 annual report

    International Nuclear Information System (INIS)

    1997-01-01

    Operating and financial information from B.C. Hydro for 1997 is presented. B.C. Hydro is the third largest electric utility in Canada. The utility generates between 43,000 and 54,000 gigawatt-hours of electricity annually. More than 80 per cent of the electricity is produced by major hydroelectric generating stations on the Columbia and Peace rivers. This report presents a picture of improved financial performance, details of all revenues and expenditures and capsule summaries of the Utility's operations. The report also addresses issues regarding strategic direction, local and international competition, and consultation and regulatory activities. tabs. and figs

  16. Application of reliability methods in Ontario Hydro

    International Nuclear Information System (INIS)

    Jeppesen, R.; Ravishankar, T.J.

    1985-01-01

    Ontario Hydro have established a reliability program in support of its substantial nuclear program. Application of the reliability program to achieve both production and safety goals is described. The value of such a reliability program is evident in the record of Ontario Hydro's operating nuclear stations. The factors which have contributed to the success of the reliability program are identified as line management's commitment to reliability; selective and judicious application of reliability methods; establishing performance goals and monitoring the in-service performance; and collection, distribution, review and utilization of performance information to facilitate cost-effective achievement of goals and improvements. (orig.)

  17. Navigating the hydro market in Latin America

    International Nuclear Information System (INIS)

    Yermoli, C.A.

    1995-01-01

    The governments of most Latin American countries have yet to establish clear policies about the future ownership of existing generation assets, but they do expect future capacity to be largely developed by the private sector. There were at one time plans for many government-financed hydro projects in the area, but these projects produced much paper and little electricity. Present trends will take the area toward independent power projects, both hydro projects and thermal power projects. This article is a review of those present trends

  18. Sustainability Challenge of Micro Hydro Power Development in Indonesia

    Science.gov (United States)

    Didik, H.; Bambang, P. N.; Asep, S.; Purwanto, Y. A.

    2018-05-01

    Rural electrification using renewable energy is the best choice for many locations that far away from national grid. Many renewable energy project have been built for rural electrification such as micro hydro power plant (MHPP) and solar photovoltaic (SPV). Sustainability still the main challenge of off-grid renewable energy development for off-grid rural electrification in Indonesia. The objective of this paper is to review sustainability of micro hydro power development in Indonesia. The research method was done by field observation, interview with MHPP management, and reviewing some research about MHPP in Indonesia. Sustainability issues include various aspects that can be classified into 5 dimensions: technical, economic, socio-cultural, institutional, and environmental. In technical factors that lead to sustainability problem are: improper MHPP design and construction, improper operation and maintenance, availability of spare parts and expertise. In the economic dimension are generally related to: low electricity tariff and utilization of MHPP for productive use. In the social dimension are: the growth of consumer’s load exceeding the capacity, reduced number of consumers, lack of external institutional support. In the institutional side, it is generally related to the ability of human resources in managing, operating and maintaining of MHPP. Environmental factors that lead the sustainability problems of MHPP are: scarcity of water discharge, conflict of water resources, land conversion over the watershed, and natural disasters.

  19. Managing a hydro-energy reservoir: A policy approach

    Energy Technology Data Exchange (ETDEWEB)

    Van Ackere, Ann [HEC Lausanne, Internef, Universite de Lausanne, CH 1015 Lausanne, Dorigny (Switzerland); Ochoa, Patricia [London Business School, Regent' s Park, London NW1 4SA (United Kingdom)

    2010-11-15

    Liberalisation and privatisation have increased the need to gain more understanding into the management of hydro storage (HS) plants. We analyse what types of reservoir management policies enable an owner or a public authority to achieve their respective objectives. By 'policy' we understand simple, easily applicable decision rules, which enable a decision maker to decide when and how much to produce based on currently available information. We use a stylised deterministic simulation model of a hydro-power producer (HP) who behaves strategically. We study a non-liberalised market, where the authorities aim to minimise the total electricity cost for customers and a liberalised market where the HP attempts to maximise his contribution. This enables us to evaluate the impact of the liberalisation of HS production decisions on production volumes and electricity prices. We conclude that imposing rigid policies with the aim of limiting the potential for strategic behaviour can create incentives to produce only at very high prices throughout the year. This can lead to very high total costs, especially when the producer has most flexibility (large reservoirs combined with large turbine capacity). More surprisingly, we observe lower total production in a non-liberalised market. (author)

  20. Managing a hydro-energy reservoir: A policy approach

    Energy Technology Data Exchange (ETDEWEB)

    Ackere, Ann van, E-mail: Ann.vanAckere@unil.c [HEC Lausanne, Internef, Universite de Lausanne, CH 1015 Lausanne, Dorigny (Switzerland); Ochoa, Patricia, E-mail: Patricia.Ochoa@edfenergy.co [London Business School, Regent' s Park, London NW1 4SA (United Kingdom)

    2010-11-15

    Liberalisation and privatisation have increased the need to gain more understanding into the management of hydro storage (HS) plants. We analyse what types of reservoir management policies enable an owner or a public authority to achieve their respective objectives. By 'policy' we understand simple, easily applicable decision rules, which enable a decision maker to decide when and how much to produce based on currently available information. We use a stylised deterministic simulation model of a hydro-power producer (HP) who behaves strategically. We study a non-liberalised market, where the authorities aim to minimise the total electricity cost for customers and a liberalised market where the HP attempts to maximise his contribution. This enables us to evaluate the impact of the liberalisation of HS production decisions on production volumes and electricity prices. We conclude that imposing rigid policies with the aim of limiting the potential for strategic behaviour can create incentives to produce only at very high prices throughout the year. This can lead to very high total costs, especially when the producer has most flexibility (large reservoirs combined with large turbine capacity). More surprisingly, we observe lower total production in a non-liberalised market.

  1. Managing a hydro-energy reservoir: A policy approach

    International Nuclear Information System (INIS)

    Van Ackere, Ann; Ochoa, Patricia

    2010-01-01

    Liberalisation and privatisation have increased the need to gain more understanding into the management of hydro storage (HS) plants. We analyse what types of reservoir management policies enable an owner or a public authority to achieve their respective objectives. By 'policy' we understand simple, easily applicable decision rules, which enable a decision maker to decide when and how much to produce based on currently available information. We use a stylised deterministic simulation model of a hydro-power producer (HP) who behaves strategically. We study a non-liberalised market, where the authorities aim to minimise the total electricity cost for customers and a liberalised market where the HP attempts to maximise his contribution. This enables us to evaluate the impact of the liberalisation of HS production decisions on production volumes and electricity prices. We conclude that imposing rigid policies with the aim of limiting the potential for strategic behaviour can create incentives to produce only at very high prices throughout the year. This can lead to very high total costs, especially when the producer has most flexibility (large reservoirs combined with large turbine capacity). More surprisingly, we observe lower total production in a non-liberalised market. (author)

  2. Ontario Hydro diversifies into tritium

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    A report is given on a plant which is to be built at the Darlington Candu reactor site in Canada for the extraction of tritium from heavy water. As tritium is used as a fuel in fusion research the market for it is expected to grow. The design of the system is outlined with the help of a flow diagram. (U.K.)

  3. Design concept of Hydro cascade control system

    International Nuclear Information System (INIS)

    Fustik, Vangel; Kiteva, Nevenka

    2006-01-01

    In this paper a design concept of the comple hydro cascade scheme is presented with the design parameters of the main technical features. The cascade control system architecture is designed considering up-to-date communication and information technology. The control algorithm is based on Pond Level Control and Economic Load Allocation concepts.

  4. Ontario Hydro's plan for used nuclear fuel

    International Nuclear Information System (INIS)

    Stevens-Guille, P.D.; Howes, H.A.; Freire-Canosa, J.

    1992-01-01

    A comprehensive plan for the management of used nuclear fuel has been published by Ontario Hydro. In this paper current practices are discussed and actions leading to disposal in a repository are outlined. Extended storage options are discussed should disposal be delayed

  5. Using historic earnings to value hydro energy

    International Nuclear Information System (INIS)

    Robson, I.A.; Whittington, H.W.

    1993-01-01

    This article briefly presents a technique for assigning a value to the water held in and removed from the hydro reservoir. Using historic earnings as the basis for a series of equations, it aims to give engineers trading energy a reliable means of placing a value on what is effectively a ''free'' resource. (Author)

  6. Resettlement associated with hydro projects in China

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The flow rates of Chinese rivers are subject to major seasonal fluctuations, and as a result large reservoirs have to be constructed for flood control, irrigation, and power generation. As most of the river valleys are densely populated, the relocation and resettlement of people from the reservoir areas are major but unavoidable problems to be addressed in building hydro projects in China. (author)

  7. IPPSO raises Hydro exports in smog negotiations

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Independent Power Producers of Ontario (IPPSO) requested federal and provincial committees negotiating atmospheric emission standards to review Ontario Hydro's export wheeling plans. IPPSO alleges that Ontario Hydro is preparing to apply pressure on the Canadian export approval process, and is building up a major effort that will increase emissions, contrary to the objectives embodied in a number of environment protection projects such as the Ontario Smog Plan, The Federal-Provincial NOx Management Plan, the Strategic Options Plan, or the Convention on Long-Range Transboundary Air Pollution Draft NOx Protocol Negotiations. IPPSO alleges further that while Ontario Hydro is one of Canada's largest single emitter of greenhouse gases NOx, and SO 2 , and as a public sector corporation it should be the most amenable to serving the public good, the Corporation is doing exactly the opposite: it actively prevents production of electricity from less polluting sources. It is IPPSO's contention that Ontario Hydro's desire to control the Ontario market could come at significant cost to the environment

  8. Analyze the factors effecting the development of hydro power projects in hydro rich regions of India

    Directory of Open Access Journals (Sweden)

    Ameesh Kumar Sharma

    2016-09-01

    Full Text Available Power is considered as the major back bone for all the nations throughout the world including India on the basis of which development of the country depends. If a country has the resources to generate the power at competitive price in that case the people of the country get the benefits in terms of improvement in their social and economical life. When we talk about India, various locations in the country where still there is no electricity people are living in dark without having the access of the modern technology. The total hydro power potential of India is 1, 50,000 MW out of this total hydro potential only 40,195 MW is exploited till 2014. More than 80% of the total hydro potential of the country is lying in the western Himalayan states (Jammu and Kashmir, Himachal Pradesh, Uttrakhand and Arunachal Pradesh. Small hydro projects are also playing a very important role in the modern world for the development of the remote areas which are not main grid connected specially in western Himalayan region of India. India has a total potential 19,749 MW of small hydro projects and of this total potential only 3990.9 MW harnessed till 2014. Ministry of new and renewable energy in India is also providing special incentives to hydro rich states of India. In this research article we are taken the case study of the small hydro projects in the western Himalayan region because theses states are having vast small hydro potential which is still needed to be harnessed. So, it is very important to identify the factors which are effecting the development of these small ventures especially in western Himalayan region in India.

  9. Hydro biological investigations of lake Drukshiai

    International Nuclear Information System (INIS)

    Mazheikaite, S.; Sinkevichiene, Z.; Marchiulioniene, D.; Astrauskas, A.; Barshiene, J.

    1998-01-01

    Purposes of this research were to investigate changes in the physical, chemical and tropic conditions of Lake Drukshiai caused by the combined effect of Ignalina NPP and how it effects on structures and function of biocenoses; to estimate the influence of phytocenoses, zoocenoses and bacteriocenoses on the quality of water in Lake Drukshiai; to estimate the eco toxicological state of Lake Drukshiai. According to the complex hydro biological investigations on Lake Drukshiai - Ignalina NPP cooler great changes in planktonic organism community, tendencies of those changes in different ecological zones were evaluated in 1993 - 1997. The amount of species of most dominant planktonic organisms in 1993 - 1997 decreased 2-3 times in comparison with that before Ignalina NPP operation: phytoplankton from 116 to 40 - 50, zooplankton - from 233 to 139. The organic matter increasing tendency was determined in bottom sediments of the lake. The highest amount of it was evaluated in the south - eastern part of the lake. 69 water macrophyte species were found in bottom sediments during the investigation period. 16 species were not found in this lake earlier. Abundance of filamentous green algae was registered.The rates of fish communities successional transformation were ten times in excess of those of the given processes in natural lakes. Moreover the comparison of results on Lake Drukshiai bioindication analysis with changes of comparable bio markers which were obtained from other water systems of Lithuania, Switzerland, Sweden and Poland, including those with active nuclear power plants in their environment was carried out. It was determined that the functional and structural changes in Lake Drukshiai biota are mostly caused by chemical pollution. It was found out that the frequency of cytogenetic damage emerged as a specific radionuclide - caused effect in aquatic organisms inhabiting Lake Drukshiai, is slightly above the background level and is 5 times lower than the same

  10. Video game experience and its influence on visual attention parameters: an investigation using the framework of the Theory of Visual Attention (TVA).

    Science.gov (United States)

    Schubert, Torsten; Finke, Kathrin; Redel, Petra; Kluckow, Steffen; Müller, Hermann; Strobach, Tilo

    2015-05-01

    Experts with video game experience, in contrast to non-experienced persons, are superior in multiple domains of visual attention. However, it is an open question which basic aspects of attention underlie this superiority. We approached this question using the framework of Theory of Visual Attention (TVA) with tools that allowed us to assess various parameters that are related to different visual attention aspects (e.g., perception threshold, processing speed, visual short-term memory storage capacity, top-down control, spatial distribution of attention) and that are measurable on the same experimental basis. In Experiment 1, we found advantages of video game experts in perception threshold and visual processing speed; the latter being restricted to the lower positions of the used computer display. The observed advantages were not significantly moderated by general person-related characteristics such as personality traits, sensation seeking, intelligence, social anxiety, or health status. Experiment 2 tested a potential causal link between the expert advantages and video game practice with an intervention protocol. It found no effects of action video gaming on perception threshold, visual short-term memory storage capacity, iconic memory storage, top-down control, and spatial distribution of attention after 15 days of training. However, observations of a selected improvement of processing speed at the lower positions of the computer screen after video game training and of retest effects are suggestive for limited possibilities to improve basic aspects of visual attention (TVA) with practice. Copyright © 2015 Elsevier B.V. All rights reserved.

  11. Realisation of a small hydro power plant in the water supply of the Gudo municipality; Realizzazione di una microcentrale idroelettrica sulla condotta di adduzione tra le sorgenti Valle del Cugnolo e il serbatoio Sasso Grande - Studio di fattibilita

    Energy Technology Data Exchange (ETDEWEB)

    Mutti, M.

    2008-12-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the feasibility study for the renewal of the drinking-water supply of the Gudo Municipality, Switzerland, including a new micro-scale power plant at the entrance of the main water reservoir. The water quantities available are listed. The investment cost is evaluated. The major cost arises from the replacement of the main pipe connecting the remote spring to the water reservoir by a penstock following a new lie. The project is technically feasible, but economically not. However, considering the age and actual status of the water supply, the authorities will anyway soon have to take adequate measures.

  12. Manitoba Hydro-Electric Board 52. annual report : Building as one

    International Nuclear Information System (INIS)

    2003-01-01

    A provincial Crown corporation, Manitoba Hydro serves approximately 502,000 customers throughout Manitoba with electric energy, and provides natural gas service to 251,000 customers in several communities in southern Manitoba. In addition, Manitoba Hydro exports electricity to electric utilities and marketers in the mid-western United States, Ontario, and Saskatchewan. In 2002, Winnipeg Hydro was purchased from the City of Winnipeg. Records were broken for historical peak demand for electricity (24 February 2003) and natural gas (22 January 2003). A study of wind power generation was launched, with seven sites being monitored. A Power Smart program focusing on geothermal heat pump systems also offered assistance to Manitoba homeowners. Successful conversion of the Selkirk Generating Station from coal to natural gas was achieved. In Brandon, a 260 mega watt (MW) natural gas combustion turbine plant was opened. Over $29 million in loans were issued to customers under the Home Comfort and Energy Savings Program. Electricity rates for residential customers remained unchanged, as did those for large industrial customers. Approval was received by the National Energy Board to export 500 MW of electricity to Northern States Power. A new international interconnection was brought into service in November 2002 between Glenboro, Manitoba and Harvey, North Dakota. The ISO 14001 international certification for environmental management systems was awarded to Manitoba Hydro. tabs., figs

  13. A 100% renewable electricity generation system for New Zealand utilising hydro, wind, geothermal and biomass resources

    International Nuclear Information System (INIS)

    Mason, I.G.; Page, S.C.; Williamson, A.G.

    2010-01-01

    The New Zealand electricity generation system is dominated by hydro generation at approximately 60% of installed capacity between 2005 and 2007, augmented with approximately 32% fossil-fuelled generation, plus minor contributions from geothermal, wind and biomass resources. In order to explore the potential for a 100% renewable electricity generation system with substantially increased levels of wind penetration, fossil-fuelled electricity production was removed from an historic 3-year data set, and replaced by modelled electricity production from wind, geothermal and additional peaking options. Generation mixes comprising 53-60% hydro, 22-25% wind, 12-14% geothermal, 1% biomass and 0-12% additional peaking generation were found to be feasible on an energy and power basis, whilst maintaining net hydro storage. Wind capacity credits ranged from 47% to 105% depending upon the incorporation of demand management, and the manner of operation of the hydro system. Wind spillage was minimised, however, a degree of residual spillage was considered to be an inevitable part of incorporating non-dispatchable generation into a stand-alone grid system. Load shifting was shown to have considerable advantages over installation of new peaking plant. Application of the approach applied in this research to countries with different energy resource mixes is discussed, and options for further research are outlined.

  14. Impact of the future water value on wind-reversible hydro offering strategies in electricity markets

    International Nuclear Information System (INIS)

    Sánchez de la Nieta, A.A.; Contreras, J.; Catalão, J.P.S.

    2015-01-01

    Highlights: • A stochastic mixed integer linear model is proposed to maximize the profit and the future water value. • Conditional Value at Risk (CVaR) is used for risk-hedging. • The offer strategies analyzed are single and separate, with and without a physical connection. • The effect of considering the future water value of the reservoirs is studied for several time horizons. - Abstract: A coordinated offering strategy between a wind farm and a reversible hydro plant can reduce wind power imbalances, improving the system efficiency whilst decreasing the total imbalances. A stochastic mixed integer linear model is proposed to maximize the profit and the future water value FWV of the system using Conditional Value at Risk (CVaR) for risk-hedging. The offer strategies analyzed are: (i) single wind-reversible hydro offer with a physical connection between wind and hydro units to store spare wind energy, and (ii) separate wind and reversible hydro offers without a physical connection between them. The effect of considering the FWV of the reservoirs is studied for several time horizons: one week (168 h) and one month (720 h) using an illustrative case study. Conclusions are duly drawn from the case study to show the impact of FWV in the results.

  15. Inventory studies of hydroelectric power plants: the methodological differences for small and large power plants; Estudos de inventario de usinas hidreletricas: as diferencas metodologicas para pequenas e grandes centrais

    Energy Technology Data Exchange (ETDEWEB)

    Bajay, Sergio Valdir [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica. Dept. de Energia; Martinez, Carlos Barreira [Faculdade de Engenharia Civil de Itajuba, MG (Brazil)

    1992-12-31

    The hydroelectric potential handbook produced by ELETROBRAS provides procedures to guides the hydro power studies of river sites. In this paper, a critical analysis of these procedures is carried out, for both large and small hydro power plants, pin pointing the plant`s planning/design interface there, several proposals are put forward in the order to adapt these procedures to small hydro plants, optimizing their planning and design for the several situation, found in Brazilian reality. (author) 5 refs.

  16. Flying the flag for hydro

    Energy Technology Data Exchange (ETDEWEB)

    Moxon, S.

    1999-03-01

    The financial arrangements for the prestigious San Roque hydroelectric project in the Philippines are explained. When complete, San Roque will generate 345MW of additional power for the grid and provide water for 87,000ha of agricultural land. The build-operate-transfer (BOT) policy is strong in the Philippines: it is believed to encourage more rapid development of power plant and the World Bank has been pleased with the progress made. The BOT scheme was awarded to a consortium (now known as the San Roque Power Corporation) consisting of two Japanese and one American company: Sithe Holdings Philippines is a 50.5% shareholder. A 25-year power purchase has been agreed with the National Power Corporation and the consortium: payment will be according to a formula (stipulated in the power purchase agreement) in dollars, yen and peso. The total cost of the project (which should be completed in 2003) will be nearly US dollars 1200M. (UK)

  17. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  18. Hydro Ottawa achieves Smart Meter milestone

    International Nuclear Information System (INIS)

    Anon.

    2008-01-01

    As Ontario's second largest municipal electricity company, Hydro Ottawa serves more than 285,000 residential and business customers in the city of Ottawa and the village of Casselman. Since 2006, the utility has installed more than 230,000 Smart Meters throughout its service territory in an effort to provide better services to its customers. This initiative represents the largest operational advanced metering infrastructure network in Canada. This move was necessary before time-of-use rates can be implemented in Ottawa. The Smart Meters deliver data wirelessly to Hydro Ottawa's Customer Information System for billing and eliminating manual readings. The Smart Meters are designed to promote more efficient use of electricity. The Government of Ontario has passed legislation requiring the installation of Smart Meters throughout the province by the end of 2010

  19. Small hydro generation building block profile

    International Nuclear Information System (INIS)

    2003-01-01

    Concise business information on small hydro generation in British Columbia was presented in this document. It was noted that the steep terrain within the province and its abundant precipitation provides numerous opportunities for hydropower generation in British Columbia. The hydroelectric sector produces approximately 90 per cent of the electrical demand in the province. The document focusses on small hydro sites producing between 0.5 and 50 mega watts (MW) and not having large water storage. In the first section, an overview of the electricity sector in the province is provided. The following issues are examined in subsequent sections: land resources; infrastructure requirements; sales market; labour market; the regulatory regime; development factors; non-governmental aspects; investments and economics; the present status and future outlook of the industry; and, government revenue. Input-output tables were also provided. 22 refs., 5 tabs., 4 figs

  20. Retrofitting the potable water supply in Vira Gambarogno, Switzerland - Feasibility study of a small hydro power plant in the Muntin water reservoir; Risanamento dell'acquedotto Monti di Vira. Studio di fattibilita di recupero energetico al serbatoio Muntin

    Energy Technology Data Exchange (ETDEWEB)

    Mutti, M.

    2008-07-01

    This final report for the Swiss Federal Office of Energy describes the retrofitting project for the potable water supply in the municipality of Vira Gambarogno, Southern Switzerland. The current status of the scheme and three possible variants are presented, including the technical and financial aspects. In a second part of the report a feasibility study is reported on for the energetic use of the potable water falling down from the springs, located at 1040 m over sea level, and the Muntin water reservoir, located at 460 m about sea level. A small hydroelectric plant can be created at the entry of the reservoir, with an electric power of about 20 kW, depending on the variant considered. Estimated energy yield and cost figures are given.

  1. Development of coal hydro gasification technology

    International Nuclear Information System (INIS)

    Itoh, Kazuo; Nomura, Kazuo; Asaoka, Yoshikiyo; Kato, Shojiro; Seo, Tomoyuki

    1997-01-01

    Taking a potential future decrease in natural gas supply into consideration, we are looking for a way to secure a stable supply of high quality substitute natural gas made from coal (which occurs abundantly throughout the world) in large volumes at low cost. We are working towards our goal of commercializing coal hydro gasification technology in the 2010's and have started developing elemental technology from FY, 1996 as a part of the governmental new energy program. (au)

  2. Financing options for small hydro projects

    International Nuclear Information System (INIS)

    Shepherd, J.C.

    1993-01-01

    Examples and techniques used to enhance the ability to finance small hydro projects, or to finance them in non-standard ways, were discussed. It was suggested that factors that motivate investors, namely the maximization of the rate of return on capital, and minimization of risk, should be the primary concern for any would-be developer. A responsible, conservative approach to financial projections was recommended as the best to impress potential investors

  3. Reports on 1977 result of Sunshine Project. Research for detailed design of coal gasification plant (studies on operating conditions 'pressurized hydro-fluidized gasification method', dissolution of research equipment); 1977 nendo sekitan gas ka plant no shosai sekkei no tame no shiken kenkyu seika hokokusho. Unten joken no kenkyu 'kaatsu suiten ryudo gas ka hoshiki' kenkyu kaitai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-03-31

    The pressurized hydro-fluidized gasification method is such that coal is hydro-gasified under a pressure of 30kg/cm{sup 3} to produce a methane-rich calorie gas. This method is a combination of three independent processes, namely, (1) thermal cracking of coal, (2) hydrogasification of thermally decomposed product, and (3) water gasification for self-contained hydrogen, and is a continuous gasification method in which all processes are operated in a fluidized bed. In fiscal 1976, an operation technique was found in which conditions suitable for each reaction purpose were given to a detached thermal cracking furnace and hydrogasification furnace and in which continuous gasification was still maintained without an adverse effect between the two furnaces. This year, the continuous gasification test will be implemented successively, determining suitable operating conditions for the purpose of increasing methane concentration and improving gasification efficiency, and concurrently extracting device-related problems that impair the continuous operation. With the aim of obtaining a self-contained system for hydrogen, water gasification tests will be conducted, with the optimum conditions determined for the water gasification. An operation test will be carried out for an internal heat type control box, so that the functions under pressurization, durability and operation criteria will be determined. (NEDO)

  4. HydroSoft coil versus HydroCoil for endovascular aneurysm occlusion study: A single center experience

    International Nuclear Information System (INIS)

    Guo Xinbin; Fan Yimu; Zhang Jianning

    2011-01-01

    Background and purpose: The HydroCoil Embolic System (HES) was developed to reduce recurrences of aneurysms relative to platinum coils. But the HydroCoil Embolic System was characterized with many limitations. The manufacturer had recognized the challenge and recently a new design of hydrogel-coated coil-HydroSoft has become available in the market as the new generation HydroCoil. We reported our initial experience using HydroSoft coil versus HydroCoil in our center. Methods: 75 aneurysms embolized primarily using HydroSoft Coils from July 2008 to May 2009 were compared with 66 volume- and shape-matched aneurysms treated with HydroCoils from March 2006 to August 2008. Outcome measures included length and number of coils used, contrast volume, and length of hospital stay. During embolization, a stable framework was first established with bare coils, and hydrogel-coated coils were used subsequently to increase the packing density. Follow-up angiographic results 6 months after treatment were evaluated among some of the patients. Results: Successful coil embolization was achieved in all patients. There were no differences in average total coil length used per aneurysm. There were no differences in length of hospital stay and packing density. HydroSoft coils were more suitable using as the finishing or final coil. HydroSoft coil decreased the procedure-related retreated rates, and aneurysm packing was finished with soft, flexible HydroSoft coil and decreased the neck remnant rates. Follow-up angiography in HydroSoft-treated patients at 6 months revealed aneurysm stability without significant residual neck. Conclusions: HydroSoft coil allowed us to deploy coated coils with good packing density. A slight expansion of these coils at the neck can be expected to reduce neck remnant and potentially inhibit recurrence.

  5. An Overview of Power Topologies for Micro-hydro Turbines

    DEFF Research Database (Denmark)

    Nababan, Sabar; Muljadi, E.; Blaabjerg, Frede

    2012-01-01

    This paper is an overview of different power topologies of micro-hydro turbines. The size of micro-hydro turbine is typically under 100kW. Conventional topologies of micro-hydro power are stand-alone operation used in rural electrical network in developing countries. Recently, many of micro-hydro...... power generations are connected to the distribution network through power electronics (PE). This turbines are operated in variable frequency operation to improve efficiency of micro-hydro power generation, improve the power quality, and ride through capability of the generation. In this paper our...... discussion is limited to the distributed generation. Like many other renewable energy sources, the objectives of micro-hydro power generation are to reduce the use of fossil fuel, to improve the reliability of the distribution system (grid), and to reduce the transmission losses. The overview described...

  6. Exploring the impact of reduced hydro capacity and lignite resources on the Macedonian power sector development

    Directory of Open Access Journals (Sweden)

    Taseska-Gjorgievskaa Verica

    2014-01-01

    Full Text Available The reference development pathway of the Macedonian energy sector highlights the important role that lignite and hydro power play in the power sector, each accounting for 40% of total capacity in 2021. In 2030, this dominance continues, although hydro has a higher share due to the retirement of some of the existing lignite plants. Three sensitivity runs of the MARKAL-Macedonia energy system model have been undertaken to explore the importance of these technologies to the system, considering that their resource may be reduced with time: (1 Reducing the availability of lignite from domestic mines by 50% in 2030 (with limited capacity of imports, (2 Removing three large hydro options, which account for 310 MW in the business-as-usual case, and (3 Both of the above restrictions. The reduction in lignite availability is estimated to lead to additional overall system costs of 0.7%, compared to hydro restrictions at only 0.1%. With both restrictions applied, the additional costs rise to over 1%, amounting to 348 M€ over the 25 year planning horizon. In particular, costs are driven up by an increasing reliance on electricity imports. In all cases, the total electricity generation decreases, but import increases, which leads to a drop in capacity requirements. In both, the lignite and the hydro restricted cases, it is primarily gas-fired generation and imports that “fill the gap”. This highlights the importance of an increasingly diversified and efficient supply, which should be promoted through initiatives on renewables, energy efficiency, and lower carbon emissions.

  7. Hydro Tasmania - renewable energy drivers, action and plans

    International Nuclear Information System (INIS)

    Gill, R.; Andrews, H.

    2005-01-01

    In Tasmania, the island state of Australia, the generator, Hydro Tasmania, is pushing technical, environmental and business boundaries in its plans to integrate a relatively high proportion (up to 20 percent) of large wind generators into its current complex mix of large and small hydropower plants. Its plans include projects to increase the efficiency of its older hydropower equipment as it prepares to supply much needed peaking capacity to the market in southern Australia via the groundbreaking Basslink undersea cable, which is due for completion in November 2005. Taken as a package these developments are creating a globally significant reference site for renewable energy systems. The paper will describe what is happening, and more importantly what is underpinning the developments, including: the harnessing of Tasmania's world-class wind resource, where recently constructed 1.75 MW wind turbines are achieving capacity factors of over 45 percent - some of the best productivity in the world today; the application of leading environmental science measures to ensure the sustainability of both the new wind farm developments and the transformation of the hydropower system to meet peak capacity demands; the relevance of the existing large hydropower storages that can operate in synergy with the wind resource; the contribution of Australia's renewable energy certificate scheme, which is effectively doubling the value of new renewable energy developments compared with existing generation sources; the application of the latest technology in hydropower turbines, combined with power system expertise from the world's leading manufacturers, to increase the efficiency of older hydropower generators, thereby more effectively harnessing the existing environmental footprint; and the transformation of Hydro Tasmania's business into a significant supplier and trader of premium value peak energy into the sophisticated Australian National Electricity Market. (author)

  8. Volume reduction/solidification of liquid radioactive waste using bitumen at Ontario Hydro's Bruce Nuclear Generating Station 'A'

    International Nuclear Information System (INIS)

    Day, J.E.; Baker, R.L.

    1995-01-01

    Ontario Hydro at the Bruce Nuclear Generating Station 'A' has undertaken a program to render the station's liquid radioactive waste suitable for discharge to Lake Huron by removing sufficient radiological and chemical contaminants to satisfy regulatory requirements for emissions. The system will remove radionuclide and chemical contaminants from five different plant waste streams. The contaminants will be immobilized and stored at on-site radioactive waste storage facilities and the purified streams will be discharged. The discharge targets established by Ontario Hydro are set well below the limits established by the Ontario Ministry of Environment (MOE) and are based on the Best Available Technology Economically Achievable Approach (B.A.T.E.A.). ADTECHS Corporation has been selected by Ontario Hydro to provide volume reduction/solidification technology for one of the five waste streams. The system will dry and immobilize the contaminants from a liquid waste stream in emulsified asphalt using thin film evaporation technology

  9. Aquatic Plant Management Program current status and seasonal workplan

    Energy Technology Data Exchange (ETDEWEB)

    Burns, E.R.; Bates, A.L.; Webb, D.H.

    1993-07-01

    The objective of the TVA Aquatic Plant Management Program is to support in an environmentally and economically responsible manner, the balanced multiple uses of the water resource of the Tennessee Valley. This is accomplished by following an integrated approach to prevent introduction and spread of noxious species, documenting occurrence and spread of existing species, and suppressing or eliminating problems in designated high use areas. It is not the TVA objective, nor is it biologically feasible and prudent to eliminate all aquatic vegetation. Aerial photography, helicopter reconnaissance, and field surveys are used to assess distributions and abundance of various aquatic macrophytes. Water level fluctuations are supplemented by herbicide applications to control undesirable vegetation. Investigations are conducted to evaluate water level fluctuation schemes, as well as biological, mechanical, and alternative chemical control techniques which offer potential for more environmentally compatible and cost-effective management operations.

  10. Hydro-Thermal-Wind Generation Scheduling Considering Economic and Environmental Factors Using Heuristic Algorithms

    Directory of Open Access Journals (Sweden)

    Suresh K. Damodaran

    2018-02-01

    Full Text Available Hydro-thermal-wind generation scheduling (HTWGS with economic and environmental factors is a multi-objective complex nonlinear power system optimization problem with many equality and inequality constraints. The objective of the problem is to generate an hour-by-hour optimum schedule of hydro-thermal-wind power plants to attain the least emission of pollutants from thermal plants and a reduced generation cost of thermal and wind plants for a 24-h period, satisfying the system constraints. The paper presents a detailed framework of the HTWGS problem and proposes a modified particle swarm optimization (MPSO algorithm for evolving a solution. The competency of selected heuristic algorithms, representing different heuristic groups, viz. the binary coded genetic algorithm (BCGA, particle swarm optimization (PSO, improved harmony search (IHS, and JAYA algorithm, for searching for an optimal solution to HTWGS considering economic and environmental factors was investigated in a trial system consisting of a multi-stream cascaded system with four reservoirs, three thermal plants, and two wind plants. Appropriate mathematical models were used for representing the water discharge, generation cost, and pollutant emission of respective power plants incorporated in the system. Statistical analysis was performed to check the consistency and reliability of the proposed algorithm. The simulation results indicated that the proposed MPSO algorithm provided a better solution to the problem of HTWGS, with a reduced generation cost and the least emission, when compared with the other heuristic algorithms considered.

  11. Hydro-methane and methanol combined production from hydroelectricity and biomass: Thermo-economic analysis in Paraguay

    International Nuclear Information System (INIS)

    Rivarolo, M.; Bellotti, D.; Mendieta, A.; Massardo, A.F.

    2014-01-01

    Highlights: • We investigate H 2 /O 2 production from large hydraulic plant by water electrolysis. • We produce methanol and hydro-methane from H 2 /O 2 obtained. • We investigate two different configurations of the plant. • We perform a thermo-economic analysis for three scenarios in Paraguay. • We find plants optimal size using a time-dependent thermo-economic approach. - Abstract: A thermo-economic analysis regarding large scale hydro-methane and methanol production from renewable sources (biomass and renewable electricity) is performed. The study is carried out investigating hydrogen and oxygen generation by water electrolysis, mainly employing the hydraulic energy produced from the 14 GW Itaipu Binacional Plant, owned by Paraguay and Brazil. Oxygen is employed in biomass gasification to synthesize methanol; the significant amount of CO 2 separated in the process is mixed with hydrogen produced by electrolysis in chemical reactors to produce hydro-methane. Hydro-methane is employed to supply natural gas vehicles in Paraguay, methanol is sold to Brazil, that is the largest consumer in South America. The analysis is performed employing time-dependent hydraulic energy related to the water that would normally not be used by the plant, named “spilled energy”, when available; in the remaining periods, electricity is acquired at higher cost by the national grid. For the different plant lay-outs, a thermo-economic analysis has been performed employing two different software, one for the design point and one for the time-dependent one entire year optimization, since spilled energy is strongly variable throughout the year. Optimal sizes for the generation plants have been determined, investigating the influence of electricity cost, size and plant configuration

  12. Some impacts and mitigations for small hydro developments in Newfoundland and Labrador

    International Nuclear Information System (INIS)

    Buchanan, R.

    1993-01-01

    Potential adverse impacts of small hydro power plants were defined and some of the mitigative techniques that can be used to eliminate or alleviate these impacts were outlined. Potential adverse impacts involved in the construction of hydro projects were identified as those associated with construction of dams, borrow areas, access roads, powerhouses, canals, penstocks, and transmission lines. Fish passage and fish habitat maintenance were also among the major issues that confront most of the proposed small hydro projects in Newfoundland. Fish passage and habitat issues received particular attention in view of their obvious importance in a province where fishing is a way of life for large segments of the population. Major challenges included both upstream and downstream fish passage, and maintenance flows downstream of dams. Upstream migration could be facilitated by fishways. Downstream migration of Atlantic salmon smolts was said to be more problematic, but could be addressed by strategies such as intake design, screens, bypasses, sluices, turbine selection, plant shutdowns at critical times and operation of turbines at peak efficiencies. 12 refs., 2 tabs

  13. Planning and running of the hydro aggregates in the electric power system in the R. Macedonia

    International Nuclear Information System (INIS)

    Ilijovski, Igor

    2015-01-01

    The subject of the research in this master thesis is analysis of the main characteristics and control of the large Hydropower plants (HPPs) in the electric power system in R. Macedonia, which are subject to planning in the running tables. ELEM and MEPSO are using SCADA system for monitoring and control of the hydropower plants. The planning is a complex process where many aspects should be covered. With correct and optimal control of the hydro aggregates, depending on the hydrology, climate, elevation of the reservoirs and many other conditions, a better efficiency of the water resources usage may be obtained, which results in positive financial outcomes. (author)

  14. Advances in the implementation of a generic long term model for the hydro industry

    International Nuclear Information System (INIS)

    Welt, F.

    2004-01-01

    This presentation describes the Vista Long Term (LT) simulation and decision tool developed for the hydropower and water resource industries by Synexus Global. Vista maximizes the value of hydro resources while addressing environmental concerns. It improves water resource management for all uses over the long term. The tool has been used and adapted to many systems around the world, including Bonneville Power Administration, Reliant Energy, PacifiCorp and Great Lakes Power in the United States and Nova Scotia Power, Yukon Energy, and Newfoundland Hydro in Canada. Vista also helps to plan alternative operating policies and system upgrades by maximizing the expected value of generation and transactions. The tool provides reservoir releases, generation, flows, levels and transactions. Hydroelectric generating facilities that use the Vista tool have improved clean energy production as well as increased revenues resulting from reservoir and plant optimization. tabs., figs

  15. Standardized CSR and climate performance: why is Shell willing, but Hydro reluctant?; Shell; Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Boasson, Elin Lerum; Wettestad, Joergen

    2007-06-15

    This report aims to contribute to the ongoing discussion concerning whether CSR merely serves to streamline company rhetoric or also has an influence on actual efforts. We discuss the tangible effects of CSR instruments on the climate-related rules and performances of the two different oil companies Hydro and Shell. First we explore whether similar CSR instruments lead to similar climate-related rules and practices in the two companies. Both Hydro and Shell adhere to the Global Compact (GC), the Global Reporting Initiative (GRI), the Carbon Disclosure Project (CDP) and the Global Gas Flaring Reduction Public-Private Partnership (GGFR). The report concludes that the GC has not rendered any tangible effects in either of the companies. Concerning the other instruments, Hydro has only followed the instrument requirements that fit their initial approach, and refrained from all deviating requirements. Shell has been more malleable, but we have noted few effects on the actual emissions and business portfolio resulting from the instrument adherence. Second, we assess how the differing results of the similar CSR portfolio may be explained. The reluctant attitude of the leaders in Hydro and the strong CSR motivation of Shell's executives result in significant differences. Hydro executives are able to constrain the effects of the instrument adherence. With Shell we note the opposite pattern: Its leaders promoted the instruments to be translated into internal rules, but a general lack of hierarchical structures hinders them from governing the conduct of various sub-organisations. The very diversity of the Shell culture helps to explain why the efforts of its executives have resulted in limited impact. The strength of the Hydro culture makes the corporation resistant to the instruments. Moreover, Hydro is strikingly shielded by virtue of its strong position in Norway. In contrast, Shell is more strongly affected by the global field of petroleum and the global field of CSR

  16. Hydro-electric power - potential and limitations

    International Nuclear Information System (INIS)

    Amundsen, T.

    1995-01-01

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world's growing population, the unavoidable conclusion is that more power is to be produced. 3 figs

  17. Main coolant pump testing at Ontario Hydro

    International Nuclear Information System (INIS)

    Hartlen, R.

    1991-01-01

    This article describes Ontario Hydro Research Division's experience with a computerized data acquisition and analysis system for monitoring mechanical vibration in reactor coolant pumps. The topics covered include bench-marking of the computer system and the coolant pumps, signatures of normal and malfunctioning pumps, analysis of data collected by the monitoring system, simulation of faults, and concerns that have been expressed about data interpretation, sensor types and locations, alarm/shutdown limits and confirmation of nondestructive examination testing. This presentation consists of overheads only

  18. Hydro-electric power - potential and limitations

    Energy Technology Data Exchange (ETDEWEB)

    Amundsen, T.

    1995-12-31

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world`s growing population, the unavoidable conclusion is that more power is to be produced. 3 figs.

  19. The Ontario Hydro mortality surveillance programme

    International Nuclear Information System (INIS)

    Anderson, T.W.

    1985-01-01

    The Ontario Hydro mortality surveillance programme was the first such study established in any group of radiation workers. Copies of annual reports are available to senior officials of both management and union and to members of the general public. Apart from an elevated Standardized Mortality Ratio in the 15.0 - 19.9 cSv range, there is no suggestion of any rising cancer death rate with increased lifetime radiation dose. It should be noted that employees who had left before pensionable age were not included in the study. Results of the study are presented in tabular form

  20. Hydro-Quebec : positioning and strategic planning

    International Nuclear Information System (INIS)

    Lanoue, R.

    1998-01-01

    Hydro-Quebec's corporate concerns for 1998-2002 were highlighted. The Corporation's strategic plan envisages that within the next decade, the utility will boost sales by 25 per cent with an investment of $13.2 billion in new generation projects. The electric utility plans to build on past experience and maintain its electricity rates and service quality. Sustaining environmental quality while developing into a world class enterprise remains a major objective of the utility. Research and development will also continue to be an integral part of the utility's operations. Tabs., figs

  1. Low head hydro market assessment : main report : vol. 1

    International Nuclear Information System (INIS)

    2008-03-01

    Hydroelectric power is a predictable renewable energy source that produces no greenhouse gases (GHGs) and has low maintenance costs. In addition to river resources, low head hydro is available in sluice gates, irrigation canals, drinking water pressure release valves, and municipal wastewater outfalls. Canada's potential for low head hydro has been estimated at 5000 MW at 2000 different sites across the country. Sites of up to 50 MW have been identified in Ontario and Manitoba. This study performed a market assessment on low head hydro developments. Available and emerging technologies for developing low head hydro were identified. The economics of low head hydro in Canada were explored, and barriers to low head hydro development were identified. Strategies to promote low head hydro development were also explored, and the impact of different incentive types on the low head hydropower market were estimated using a simple economic model. It was concluded that a reduced, streamlined, and standardized environmental assessment process will significantly benefit low head hydro development in Canada. 5 refs., 14 tabs., 17 figs

  2. Interconnected hydro-thermal systems - Models, methods, and applications

    DEFF Research Database (Denmark)

    Hindsberger, Magnus

    2003-01-01

    to be performed where the uncertainty of the inflow to the hydro reservoirs is handled endogenously. In this model snow reservoirs have been added in addition to the hydro reservoirs. Using this new approach allows sampling based decomposition algorithms to be used, which have proved to be efficient in solving...

  3. 75 FR 45607 - Application To Export Electric Energy; Manitoba Hydro

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-281-B] Application To Export Electric Energy; Manitoba Hydro AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Manitoba Hydro (Manitoba) has applied to renew its authority to transmit electric energy from the...

  4. An artificial intelligence heat rate/NOx optimization system for Ontario Hydro`s Lambton Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Luk, J.; Bachalo, K.; Henrikson, J. [Ontario Hydro, Toronto, ON (Canada); Roland, W.; Booth, R.C.; Parikh, N.; Radl, B. [Pegasus Technologies Ltd., Painesville, OH (United States)

    1998-12-01

    The utilization of artificial Intelligence (AI)-based software programs to optimize power plant operations by simultaneously improving heat rate performance and reducing NOx emissions was discussed. While many AI programs were initially used for demonstration purposes, they are now available for commercial use due to their promising results. In 1996, the Fossil Business Unit of Ontario Hydro initiated a study to evaluate AI technology as a tool for optimizing heat rate and NOx reduction in coal fired stations. Tests were conducted at Units 3 and 4 of the Lambton Generation Station, located just south of Sarnia, Ontario. The tests were conducted to examine three desirable options: (1) achieve at least 0.5 per cent improvement in heat rate concurrently with a NOx reduction of at least 5 per cent, (2) optimize on `heat rate` only with minimum improvement of 2 per cent, and optimize `minimal NOx` only with reduction target of 20 per cent or more, and (3) reach a collaborative agreement with a supplier to further explore and develop AI optimization applications for other advanced and more complex plant processes. Results indicated that NOx reduction and heat rate improvement are not contradictory goals. 15 refs., 1 fig.

  5. The Atlin Hydro Project : generation for generations

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, S. [Atlin Tlingit Development Corp., Atlin, BC (Canada)

    2010-07-01

    This presentation documented the step-by-step process by which the Atlin Hydro Project was developed. The Taku River Tlingit First Nation undertook the Atlin project as part of its vision for responsible resource management, sustainable economic development, and cultural revival. The Atlin Community Energy Plan involved an assessment of electricity demand, a 20-year demand projection, energy efficiency recommendations, and an assessment of power supply options such as wind towers, connection to the Yukon power grid, and hydro. The potential impact on fisheries, hydrology, wildlife habitat, roads and bridges, navigable waters and forests, existing rights, and First Nation archaeology were assessed, along with other factors such as hazards and flood control. A hydrology assessment of the Surprise-Pine Drainage Basin was undertaken, and stream-flow measurements were taken near the intake location on Pine Creek. The project comprises a discharge control structure and a fish ladder; an intake and weir on Pine Creek; a penstock pipeline from intake to powerhouse; a powerhouse with a 2.1 MW Pelton turbine generator and a switch yard; and a power line from the powerhouse to the interconnection with the existing grid. The impacts on fisheries, wildlife, and human movement are expected to be minimal. 28 figs., 3 tabs.

  6. Ontario hydro waste storage concepts and facilities

    International Nuclear Information System (INIS)

    Carter, T.J.; Mentes, G.A.

    1976-01-01

    Ontario Hydro presently operates 2,200 MWe of CANDU heavy water reactors with a further 11,000 MWe under design or construction. The annual quantities of low and medium level solid wastes expected to be produced at these stations are tabulated. In order to manage these wastes, Ontario Hydro established a Radioactive Waste Operations Site within the Bruce Nuclear Power Development located on Lake Huron about 250 km northwest of Toronto. The Waste Operations Site includes a 19-acre Storage Site plus a Radioactive Waste Volume Reduction Facility consisting of an incinerator and waste compactor. Ontario has in use or under construction both in-ground and above-ground storage facilities. In-ground facilities have been used for a number of years while the above-ground facilities are a more recent approach. Water, either in the form of precipitation, surface or subsurface water, presents the greatest concern with respect to confinement integrity and safe waste handling and storage operations

  7. Hydro-Quebec and energy efficiency

    International Nuclear Information System (INIS)

    1990-01-01

    There is growing awareness that energy efficiency is both profitable and environmentally beneficial. In this year's Development Plan, Hydro-Quebec is proposing an Energy Efficiency Project made up of marketing programs designed for all markets throughout the final decade of the 20th century. This Project will have two aspects: energy efficiency and consumption management. Hydro-Quebec aims to reach an energy-efficiency level of 12.9 terawatt hours per year by 1999, fully 55% of its 23-terawatt hour potential. Over the next 10 years the utility intends to spend $1.8 billion for this purpose. Cumulative anticipated energy savings should be in the vicinity of 70 terawatt hours for the coming decade, and more than 130 terawatt hours for the first decade of the next century. Of the overall goal of 12.9 terawatt hours for Horizon 1999, energy savings of 9.0 terawatt hours should be the direct result of this year's proposed marketing programs, and will account for the bulk of anticipated investments. The remaining 3.9 terawatt hours will be gained as customers acquire better electrical appliance and accessory (household appliances, home insulation) buying habits

  8. Wound bed preparation: A novel approach using HydroTherapy.

    Science.gov (United States)

    Atkin, Leanne; Ousey, Karen

    2016-12-01

    Wounds that fail to heal quickly are often encountered by community nursing staff. An important step in assisting these chronic or stalled wounds progress through healing is debridement to remove devitalised tissue, including slough and eschar, that can prevent the wound from healing. A unique wound treatment called HydroTherapy aims to provide an optimal healing environment. The first step of HydroTherapy involves HydroClean plus™, this dressing enables removal of devitalised tissue through autolytic debridement and absorption of wound fluid. Irrigation and cleansing provided by Ringer's solution from the dressing further removes any necrotic tissue or eschar. Once effective wound bed preparation has been achieved a second dressing, HydroTac™, provides an ongoing hydrated wound environment that enables re-epithelialisation to occur in an unrestricted fashion. This paper presents 3 case studies of slow healing wounds treated with HydroClean plus™ which demonstrates effective wound debridement.

  9. Laboratory developments of a diagonal turbine for medium head small hydro power plants (25 - 100 m). Final report; Turbines diagonales. Programme de developpement d'une turbine hydraulique diagonale destinee a equiper les petites centrales a moyenne chute (25 a 100 m) - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Choulot, A.; Denis, V.

    2009-11-15

    The first result of the project was the mechanical design of the diagonal turbine and, in particular, the runner and the adjustable blade driving system. The system was designed for the 12-blade runner and is thus suitable for any lower number of blades. With a reference runner diameter of 329.4 mm, the laboratory test model corresponds approximately to the smallest size for a prototype of Diagonal turbine. The mechanical design is thus available for any larger prototype. The complementary use of numerical simulations and laboratory tests provided a deep understanding of the hydraulic behaviour of the Diagonal turbine. Based on this extensive knowledge, the mechanical set-up and hydraulic design was significantly improved. The developments showed that the effect of the gap between the discharge ring and the blades on both the efficiency and cavitation behaviour was significantly enhanced compared to Kaplan turbines. The optimization of this gap together with improvements of the geometry enabled to raise the maximum efficiency from 86.5% with the initial configuration to more than 92%, and to significantly reduce the development of cavitation. The first developed configuration was the 8-blade runner. Various guide vane configurations were tested. The analysis of numerical and experimental results led to the development of an optimal configuration with a maximum efficiency of 92% and a satisfactory cavitation behaviour suitable for heads up to 50 m. The development of the 12-blade runner fully profited from the knowledge gained with the 8 blade configuration. The improved blade design process significantly fastened the development phase necessary to obtain high performances. The maximum efficiency is above 92% and the cavitation behaviour allows 80 m heads. Based on these good results, a first demonstration project was launched to equip the Montsalvens site (Switzerland). The objective is to install a turbine at the foot of the Montsalvens dam of the existing hydro

  10. Alluviation of pond of the hydro-electric plant Hricov

    International Nuclear Information System (INIS)

    Jurak, M.

    2003-01-01

    Water basin Hricov has projected reserved volume 6,394 mil. cubic meters. Since 12 th August to 31 st October 2002 the channel Hricov - Miksova - Povazska Bystrica was launched for revisory works of drainage of Vah. Meterage of existing sludging of water basin was a part of releasing of basin was. Profiles of sediments were measured by released basin. They show, that basin is more than from one third choked with and sludging represents more than one third of used volume. Annually dredged volume of deposits represents approximately 40,000 cubic meters per year. Increase of deposits in basin Hrieov is approximately 150,000 cubic meters per year, what causes yearly decreasing of its accumulation volume. The sediments in basin are contaminated by cadmium, copper, zinc, polychlorinated biphenyls, polycyclic aromatic hydrocarbons and petroleum products. (author)

  11. Behaviour and passage of European silver eels (Anguilla anguilla at a small hydropower plant during their downstream migration Comportement et passage de l’anguille argentée (Anguilla anguilla au niveau d’une petite centrale hydroélectrique lors de sa migration de dévalaison

    Directory of Open Access Journals (Sweden)

    De-Oliveira E.

    2010-09-01

    Full Text Available Between 2004 and 2007, 116 downstream migrant silver eels (Anguilla anguilla were monitored at a hydropower plant on the Gave de Pau river in South-West France using radio and PIT telemetry. The objectives of the study were: (i to determine the environmental conditions when eels arrived and passed the facility; (ii to determine the rate of eel escapement (passage other than via the turbines; (iii to describe the behaviour of eels faced with the intake structure and the permeability of the intake trashracks for the different sizes of eel; and (iv to determine whether surface bypasses originally designed for salmon could be effective for eels. Five types of behaviour of silver eels in the forebay and at the plant intakes were identified. The study showed the key factor influencing both eel behaviour and the route taken through the plant was variation in river discharge. Escapement rate was related to eel length and the spill flow to river flow ratio, which could be described by a logistic regression model. The surface bypasses originally designed for salmon were found to aid downstream eel migration significantly. At velocities < 0.40 m·s−1, no eels, even the largest, for which the racks are a physical barrier, were found impinged on the trashracks. De 2004 à 2007, une étude sur la migration de dévalaison de l’anguille argentée européenne (Anguilla anguilla a été menée sur la centrale hydroélectrique de Baigts sur le Gave de Pau dans le Sud-Ouest de la France. Cette étude, au cours de laquelle 116 individus ont été suivis par télémétrie PIT et radio, avait pour objectifs : (i de déterminer les conditions de milieu propices à l’arrivée sur site et au franchissement de l’aménagement; (ii de déterminer les taux d’échappement (passages par des voies autres que les turbines; (iii d’analyser le comportement des anguilles devant les ouvrages et la perméabilité des grilles de la prise d’eau en fonction de la taille

  12. Hydro-economic modelling in mining catchments

    Science.gov (United States)

    Ossa Moreno, J. S.; McIntyre, N.; Rivera, D.; Smart, J. C. R.

    2017-12-01

    Hydro-economic models are gaining momentum because of their capacity to model both the physical processes related to water supply, and socio-economic factors determining water demand. This is particularly valuable in the midst of the large uncertainty upon future climate conditions and social trends. Agriculture, urban uses and environmental flows have received a lot of attention from researchers, as these tend to be the main consumers of water in most catchments. Mine water demand, although very important in several small and medium-sized catchments worldwide, has received less attention and only few models have attempted to reproduce its dynamics with other users. This paper describes an on-going project that addresses this gap, by developing a hydro-economic model in the upper Aconcagua River in Chile. This is a mountain catchment with large scale mining and hydro-power users at high altitudes, and irrigation areas in a downstream valley. Relevant obstacles to the model included the lack of input climate data, which is a common feature in several mining areas, the complex hydrological processes in the area and the difficulty of quantifying the value of water used by mines. A semi-distributed model developed within the Water Evaluation and Planning System (WEAP), was calibrated to reproduce water supply, and this was complemented with an analysis of the value of water for mining based on two methods; water markets and an analysis of its production processes. Agriculture and other users were included through methods commonly used in similar models. The outputs help understanding the value of water in the catchment, and its sensitivity to changes in climate variables, market prices, environmental regulations and changes in the production of minerals, crops and energy. The results of the project highlight the importance of merging hydrology and socio-economic calculations in mining regions, in order to better understand trade-offs and cost of opportunity of using

  13. Sinkhole investigated at B.C. Hydro`s Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1996-07-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro`s W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig.

  14. Architecture at Hydro-Quebec. L'architecture a Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  15. Analysis of a pico tubular-type hydro turbine performance by runner blade shape using CFD

    Science.gov (United States)

    Park, J. H.; Lee, N. J.; Wata, J. V.; Hwang, Y. C.; Kim, Y. T.; Lee, Y. H.

    2012-11-01

    There has been a considerable interest recently in the topic of renewable energy. This is primarily due to concerns about environmental impacts of fossil fuels. Moreover, fluctuating and rising oil prices, increase in demand, supply uncertainties and other factors have led to increased calls for alternative energy sources. Small hydropower, among other renewable energy sources, has been evaluated to have adequate development value because it is a clean, renewable and abundant energy resource. In addition, small hydropower has the advantage of low cost development by using rivers, agricultural reservoirs, sewage treatment plants, waterworks and water resources. The main concept of the tubular-type hydro turbine is based on the difference in water pressure levels in pipe lines, where the energy which was initially wasted by using a reducing valve at the pipeline of waterworks, is collected by turbine in the hydro power generator. In this study, in order to acquire the performance data of a pico tubular-type hydro turbine, the output power, head and efficiency characteristics by different runner blade shapes are examined. The pressure and velocity distributions with the variation of guide vane and runner vane angle on turbine performance are investigated by using a commercial CFD code.

  16. Field establishment and grain yield of maize affected by hydro-priming of differentially aged seeds

    Directory of Open Access Journals (Sweden)

    Kazem Ghassemi-Golezani

    2017-02-01

    Full Text Available A sub-sample of maize seeds (cv. SC-AR68 with a 100% germination was kept as control, and two other sub-samples were artificially deteriorated at 40 °C for 2 and 3 days, reducing normal germination to 98% and 93%, respectively. Consequently, three seed lots of maize with different levels of vigor were provided. Each seed lot was then divided into four sub-samples, one unprimed and the other three lots were primed in distilled water at 15 °C for 7, 14 and 21 hours, and then dried back to initial moisture content (about 20% at a room temperature of 20–22 °C for 24 hours. The field experiment was arranged as factorial based on randomized complete block design with three replications. Although germination percentage of seed lots was not significantly affected by hydro-priming, germination rate and seedling dry weight were considerably enhanced as a result of seed priming. Hydro-priming for 21 hours enhanced seedling emergence rate of all seed lots with different levels of vigor. This hydro-priming duration also increased grain yield of maize by about 32%, although this superiority was not statistically significant. This advantage in grain yield of plants from primed seeds was related with rapid germination and seedling growth and early emergence in the field.

  17. Experimental Hydro-Mechanical Characterization of Full Load Pressure Surge in Francis Turbines

    Science.gov (United States)

    Müller, A.; Favrel, A.; Landry, C.; Yamamoto, K.; Avellan, F.

    2017-04-01

    Full load pressure surge limits the operating range of hydro-electric generating units by causing significant power output swings and by compromising the safety of the plant. It appears during the off-design operation of hydraulic machines, which is increasingly required to regulate the broad integration of volatile renewable energy sources into the existing power network. The underlying causes and governing physical mechanisms of this instability were investigated in the frame of a large European research project and this paper documents the main findings from two experimental campaigns on a reduced scale model of a Francis turbine. The multi-phase flow in the draft tube is characterized by Particle Image Velocimetry, Laser Doppler Velocimetry and high-speed visualizations, along with synchronized measurements of the relevant hydro-mechanical quantities. The final result is a comprehensive overview of how the unsteady draft tube flow and the mechanical torque on the runner shaft behave during one mean period of the pressure oscillation, thus defining the unstable fluid-structure interaction responsible for the power swings. A discussion of the root cause is initiated, based on the state of the art. Finally, the latest results will enable a validation of recent RANS flow simulations used for determining the key parameters of hydro-acoustic stability models.

  18. Perceived risk of nuclear and hydro electrical power generation in Colombia

    International Nuclear Information System (INIS)

    Munera, H.A.

    1982-12-01

    This report deals with the estimation of risk factors of hydro plants and the perception of risks and benefits of nuclear, hydropower and coal by a selected part of the public. Historical data (1922 - 1979) on occurrence of earthquakes in Colombia demonstrate high seismicity (3,489 incidents) for the country in total and also for areas where the majority of hydro projects are to be located. Model-based calculations of regional probabilities for earthquakes at prospective dam-sites with a magnitude of 7 (Richter scale) or larger resulted in p=0.038/year for a 50 year recurrence period for high and p=0.0004/year for low seismicity areas. Attitudes towards three energy systems were elicited from 130 university students and graduates with a questionnaire based on a psychometric model. Generally attitudes were most favourable towards hydro, less favourable towards coal and more critical towards nuclear. Nuclear is perceived to have economic advantages, but to pose environmental, individual and societal risks. Respondents PRO and CON nuclear agree on the lack of risk from hydropower

  19. Dynamic Model for Hydro-Turbine Generator Units Based on a Database Method for Guide Bearings

    Directory of Open Access Journals (Sweden)

    Yong Xu

    2013-01-01

    Full Text Available A suitable dynamic model of rotor system is of great significance not only for supplying knowledge of the fault mechanism, but also for assisting in machine health monitoring research. Many techniques have been developed for properly modeling the radial vibration of large hydro-turbine generator units. However, an applicable dynamic model has not yet been reported in literature due to the complexity of the boundary conditions and exciting forces. In this paper, a finite element (FE rotor dynamic model of radial vibration taking account of operating conditions is proposed. A brief and practical database method is employed to model the guide bearing. Taking advantage of the method, rotating speed and bearing clearance can be considered in the model. A novel algorithm, which can take account of both transient and steady-state analysis, is proposed to solve the model. Dynamic response for rotor model of 125 MW hydro-turbine generator units in Gezhouba Power Station is simulated. Field data from Optimal Maintenance Information System for Hydro power plants (HOMIS are analyzed compared with the simulation. Results illustrate the application value of the model in providing knowledge of the fault mechanism and in failure diagnosis.

  20. Method for assessing wind power integration in a hydro based power system

    International Nuclear Information System (INIS)

    Norheim, I.; Palsson, M.; Tande, J.O.G.; Uhlen, K.

    2006-01-01

    The present paper demonstrates a method for assessment of how much wind power that can be integrated in a system with limited transmission capacity. Based on hydro inflow data and wind measurements (for different locations of planned wind farms in an area) it is possible to assess how much wind power that can be fed into a certain point in the transmission network without violating the transmission capacity limits. The proposed method combines the use of market modelling and detailed network analysis in order to assess the probability of network congestions rather than focusing on extreme cases. By computing the probability distribution of power flow on critical corridors in the grid it is possible to assess the likelihood of network congestions and the amount of energy that must be curtailed to fulfil power system security requirements (n-1). This way the assessment is not only made of worst case scenarios, assuming maximal flow from hydro plants and maximal wind power production. As extreme case scenarios are short term and may be solved by market mechanisms or automatic system protection schemes (disconnection of wind power or hydro power), the proposed method may reveal that it would be economic to install more wind power than if only based on analysis of worst case scenarios. (orig.)

  1. Short-term regulation of hydro powerplants. Studies on the environmental effects

    International Nuclear Information System (INIS)

    Sinisalmi, T.; Riihimaeki, J.; Vehanen, T.; Yrjaenae, T.

    1997-01-01

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs

  2. Short-term regulation of hydro powerplants. Studies on the environmental effects

    Energy Technology Data Exchange (ETDEWEB)

    Sinisalmi, T. [ed.; Forsius, J.; Muotka, J.; Soimakallio, H. [Imatran Voima Oy, Vantaa (Finland); Riihimaeki, J. [VTT, Espoo (Finland); Vehanen, T. [Finnish Game and Fisheries Research Inst. (Finland); Yrjaenae, T. [North Ostrobothnia Regional Environmental Centre, Oulu (Finland)

    1997-12-31

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs.

  3. Ontario Hydro nuclear - challenges of the future

    International Nuclear Information System (INIS)

    Field, R.

    1996-01-01

    The challenges facing Ontario Hydro Nuclear (OHN), as understood at the time of the conference, are discussed. OHN had many strengths to build on in preparing for the competition ahead, including: extremely competitive production costs, strong technical capabilities, advantages of multiple units, environmental advantages favoring nuclear, strong public support, and improving station performance. Even with these advantages, OHN faced the difficult challenge of improving overall performance in the face of a large debt burden, coupled with the reinvestment demands of aging units at Pickering A and Bruce A. At the time of the conference, Bruce 2 had already been shut down, because the cost of retubing it and replacing its boilers could not be justified. The ''drive to nuclear excellence'' involves the simultaneous achievement of top performance in safety, reliability and cost; and to this end, changes were being made to reverse the trends indicated by disappointing ''peer reviews''

  4. The Manitoba Hydro-Electric Board 50. annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs.

  5. The Manitoba Hydro-Electric Board 50. annual report

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs

  6. Experience of pico/micro hydro based power generation

    Energy Technology Data Exchange (ETDEWEB)

    Murthy, S.S. [Indian Inst. of Technology, Delhi, New Delhi (India). Dept. of Electrical Engineering

    2010-07-01

    Although India has approximately 150,000 megawatts of hydro potential, only a small portion is tapped. There is also significant untapped hydro potential in many developing countries such as Nepal, Bhutan, Vietnam, Indonesia and regions in South America and Africa. Small-scale hydroelectric power systems with capacities of up to a few megawatts are eco-friendly and sustainable. They can be classified based on unit sizes as pico (u pto 10 kilowatts), micro (10-100 kilowatts) and mini (100 kilowatts to a few megawatts) hydro systems. Mini hydro systems are always grid connected while micro can be either grid connected or off grid. Pico is always off grid. In India, there are thousands of favorable sites in this range that should be tapped for distributed power generation to electrify local communities. This need is reflected by the global emphasis on distributed power generation as well as the Government of India's policy to promote this type of power generation. A working stand alone pico-hydro power generating system has been successfully installed in 5 sites in Karnataka. The purpose of the project was to demonstrate the technical, managerial and economic feasibility of setting up small hydro projects in remote hilly areas of Karnataka, India and its positive environmental impact. The presentation discussed the site selection criteria; installed sites of pico hydro; system description; parts of the system; the electric load controller; types of electronic load controllers; and a description of the unit and control scheme. tabs., figs.

  7. Multifractal Conceptualisation of Hydro-Meteorological Extremes

    Science.gov (United States)

    Tchiguirinskaia, I.; Schertzer, D.; Lovejoy, S.

    2009-04-01

    Hydrology and more generally sciences involved in water resources management, technological or operational developments face a fundamental difficulty: the extreme variability of hydro-meteorological fields. It clearly appears today that this variability is a function of the observation scale and yield hydro-meteorological hazards. Throughout the world, the development of multifractal theory offers new techniques for handling such non-classical variability over wide ranges of time and space scales. The resulting stochastic simulations with a very limited number of parameters well reproduce the long range dependencies and the clustering of rainfall extremes often yielding fat tailed (i.e., an algebraic type) probability distributions. The goal of this work was to investigate the ability of using very short or incomplete data records for reliable statistical predictions of the extremes. In particular we discuss how to evaluate the uncertainty in the empirical or semi-analytical multifractal outcomes. We consider three main aspects of the evaluation, such as the scaling adequacy, the multifractal parameter estimation error and the quantile estimation error. We first use the multiplicative cascade model to generate long series of multifractal data. The simulated samples had to cover the range of the universal multifractal parameters widely available in the scientific literature for the rainfall and river discharges. Using these long multifractal series and their sub-samples, we defined a metric for parameter estimation error. Then using the sets of estimated parameters, we obtained the quantile values for a range of excedance probabilities from 5% to 0.01%. Plotting the error bars on a quantile plot enable an approximation of confidence intervals that would be particularly important for the predictions of multifractal extremes. We finally illustrate the efficiency of such concept on its application to a large database (more than 16000 selected stations over USA and

  8. Hydro-Quebec inspection robot RIT-LRG

    International Nuclear Information System (INIS)

    Champagne, D.; Rinfret, F.; Bourgault, Y.G.

    2008-01-01

    Hydro Quebec's Research Centre (IREQ), has developed a variety of inspection tools over the years. The Metar bracelet for the feeder tubes, the REC robot for the heat exchanger and the RIT robot for the Delayed Neutron system just to name a few. This paper discusses with the successful deployment of the Camera Probe Positioning robot for Visual Inspection of the sample lines of the delayed neutron system of CANDU power plants. This RIT robot has three possible configurations (Face, Cabinet and LRG configurations) and has remained a prototype version although it has been used over the years in many outage inspection campaigns since 1997. The main advantages of using this robot are: the significant reduction in radiation exposure, the high quality of the data collected and the archiving of inspection data for further analysis and reports. In 2007, Gentilly-2 (G-2), decided to industrialize the LRG configuration of the RIT robot and to designate it the standard tool for the inspection of the Delayed Neutron System. An improved RIT-LRG robot, along with its control box and command station was developed. The software had to be rewritten requiring an ergonomics analysis of user tasks, work station and interface display. These issues included both physical and cognitive requirements aspects. The two principal topics of this paper will be on the Inspection Robot Technology developed and highlights of the 2008 outage inspection campaign. (author)

  9. Hydro-Quebec inspection robot RIT-LRG

    Energy Technology Data Exchange (ETDEWEB)

    Champagne, D., E-mail: champagne.dominique@ireq.ca [Inst. de recherche d' Hydro-Quebec, Quebec (Canada); Rinfret, F.; Bourgault, Y.G., E-mail: rinfret.francois@hydro.qc.ca, E-mail: bourgault.yves.g@hydro.qc.ca [Hydro-Quebec, Becancour, Quebec (Canada)

    2008-07-01

    Hydro Quebec's Research Centre (IREQ), has developed a variety of inspection tools over the years. The Metar bracelet for the feeder tubes, the REC robot for the heat exchanger and the RIT robot for the Delayed Neutron system just to name a few. This paper discusses with the successful deployment of the Camera Probe Positioning robot for Visual Inspection of the sample lines of the delayed neutron system of CANDU power plants. This RIT robot has three possible configurations (Face, Cabinet and LRG configurations) and has remained a prototype version although it has been used over the years in many outage inspection campaigns since 1997. The main advantages of using this robot are: the significant reduction in radiation exposure, the high quality of the data collected and the archiving of inspection data for further analysis and reports. In 2007, Gentilly-2 (G-2), decided to industrialize the LRG configuration of the RIT robot and to designate it the standard tool for the inspection of the Delayed Neutron System. An improved RIT-LRG robot, along with its control box and command station was developed. The software had to be rewritten requiring an ergonomics analysis of user tasks, work station and interface display. These issues included both physical and cognitive requirements aspects. The two principal topics of this paper will be on the Inspection Robot Technology developed and highlights of the 2008 outage inspection campaign. (author)

  10. Aespoe Hard Rock Laboratory. Hydro Monitoring Program. Report for 2008

    Energy Technology Data Exchange (ETDEWEB)

    Wass, Eva; Nyberg, Goeran (GEOSIGMA, Uppsala (Sweden))

    2009-08-15

    The Aespoe island is situated close to the nuclear power plant of Simpevarp in southeastern Sweden. As part of the pre-investigations preceding excavation of the Aespoe Hard Rock Laboratory, registrations of the groundwater levels and electrical conductivity in packed-off borehole sections and levels in open boreholes started in 1987. The investigations are still ongoing and are planned to continue for a long period of time. As the tunnel excavation went on from the autumn 1990 and onwards, new boreholes were drilled in the tunnel and instrumented to enable groundwater pressure monitoring in packed-off sections. In addition, other hydro-related measurements such as water flow in the tunnel, electrical conductivity of tunnel water and inflow and outflow of water through tunnel pipes have been performed. This report is a summary of the monitoring during 2008. In order to allow for comparison with factors that may influence the groundwater level/pressure and flow, meteorological data are also presented in the report. From the end of 1991, the disturbance from the tunnel is the dominating factor influencing groundwater levels in the area. In one chapter, activities that may have an influence on the ground water situation are listed and briefly discussed.

  11. Aespoe Hard Rock Laboratory. Hydro Monitoring Program. Report for 2009

    Energy Technology Data Exchange (ETDEWEB)

    Wass, Eva; Nyberg, Goeran (GEOSIGMA, Uppsala (Sweden))

    2010-05-15

    The Aespoe island is situated close to the nuclear power plant of Simpevarp in southeastern Sweden. As part of the pre-investigations preceding excavation of the Aespoe Hard Rock Laboratory, registrations of the groundwater levels and electrical conductivity in packed-off borehole sections and levels in open boreholes started in 1987. The investigations are still ongoing and are planned to continue for a long period of time. As the tunnel excavation went on from the autumn 1990 and onwards, new boreholes were drilled in the tunnel and instrumented to enable groundwater pressure monitoring in packed-off sections. In addition, other hydro-related measurements such as water flow in the tunnel, electrical conductivity of tunnel water and inflow and outflow of water through tunnel pipes have been performed. This report is a summary of the monitoring during 2009. In order to allow for comparison with factors that may influence the groundwater level/pressure and flow, meteorological data are also presented in the report. From the end of 1991, the disturbance from the tunnel is the dominating factor influencing groundwater levels in the area. In one chapter, activities that may have an influence on the ground water situation are listed and briefly discussed

  12. Development of organic tritium light technology at Ontario Hydro

    International Nuclear Information System (INIS)

    Mullins, D.F.; Krasznai, J.P.; Mueller, D.A.

    1992-01-01

    Tritium is a by-product of CANDU heavy water reactor operations and is the major contributor to internal dose for plant workers. The Darlington Tritium Removal Facility (DTRF) is decontaminating heavy water by removing tritium and storing it as a metal hydride. In view of the large tritium separation capacity, (24 MCi/a, 888 PBq/a). This paper reports that Ontario Hydro is interested in pursuing markets for the peaceful uses of tritium. One of these peaceful uses is in self-luminous lighting. The state of the art at present is a phosphor coated tube filled with tritium gas. However, safety considerations have restricted the use of these lights to outdoor or essential safety applications. Binding the tritium to a solid non-volatile matrix would increase the safety of tritium lights and allow the use of other phosphors, matrices and construction geometries. Solid, organic based tritium lights were produced using two different polymer matrices. While both these materials produced visible light, the intensity was low and radiolytic damage to the polymers was evident

  13. Short-term generation scheduling model of Fujian hydro system

    Energy Technology Data Exchange (ETDEWEB)

    Wang Jinwen [School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China)], E-mail: dr.jinwen.wang@gmail.com

    2009-04-15

    The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the short-term hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to decompose the primal problem into a hydro subproblem and many individual plant-based subproblems, which are respectively solved by the improved simplex-like method (SLM) and the dynamic programming (DP). A numerical example is given and the derived solution is very close to the optimal one, with the distance in benefit less than 0.004%. All the data needed for the numerical example are presented in detail for further tests and studies from more experts and researchers.

  14. Short-term generation scheduling model of Fujian hydro system

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jinwen [School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2009-04-15

    The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the short-term hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to decompose the primal problem into a hydro subproblem and many individual plant-based subproblems, which are respectively solved by the improved simplex-like method (SLM) and the dynamic programming (DP). A numerical example is given and the derived solution is very close to the optimal one, with the distance in benefit less than 0.004%. All the data needed for the numerical example are presented in detail for further tests and studies from more experts and researchers. (author)

  15. Zebra mussels mitigation at Ontario Hydro's hydroelectric generating facilities

    International Nuclear Information System (INIS)

    Dorneanu, A.M.

    1992-01-01

    The Great Lakes and their connecting channels have recently been invaded by a tiny freshwater mollusc that has already cost Ontario Hydro millions of dollars. Dreissena polymorpha, commonly known as the zebra mussel, entered the great lakes in ballast water carried by a ship from Europe in 1985. These mussels threaten to reduce or totally block the flow of water in auxiliary systems of any generating station, water treatment plant or municipal water facility that uses raw lake water and to cause accelerated corrosion of the metallic substrate to which they attach themselves. To satisfy the immediate need for control, chlorination was identified as the most effective interim measure to prevent the biofouling of the raw water systems. Detection and monitoring of mussels and the installation, operation, environmental constraints, benefits and deficiencies of the chemical treatment system are presented. Long term objectives for control of the mussels are to develop alternatives to chlorination (ozone, hydrogen peroxide, protective coatings, thermal shock, mechanical filtration, etc.) for application at existing facilities and for incorporation into the design of new facilities and rehabilitation programs. 3 refs., 5 figs

  16. Aespoe Hard Rock Laboratory. Hydro Monitoring Program. Report for 2008

    International Nuclear Information System (INIS)

    Wass, Eva; Nyberg, Goeran

    2009-08-01

    The Aespoe island is situated close to the nuclear power plant of Simpevarp in southeastern Sweden. As part of the pre-investigations preceding excavation of the Aespoe Hard Rock Laboratory, registrations of the groundwater levels and electrical conductivity in packed-off borehole sections and levels in open boreholes started in 1987. The investigations are still ongoing and are planned to continue for a long period of time. As the tunnel excavation went on from the autumn 1990 and onwards, new boreholes were drilled in the tunnel and instrumented to enable groundwater pressure monitoring in packed-off sections. In addition, other hydro-related measurements such as water flow in the tunnel, electrical conductivity of tunnel water and inflow and outflow of water through tunnel pipes have been performed. This report is a summary of the monitoring during 2008. In order to allow for comparison with factors that may influence the groundwater level/pressure and flow, meteorological data are also presented in the report. From the end of 1991, the disturbance from the tunnel is the dominating factor influencing groundwater levels in the area. In one chapter, activities that may have an influence on the ground water situation are listed and briefly discussed

  17. Aespoe Hard Rock Laboratory. Hydro Monitoring Program. Report for 2009

    International Nuclear Information System (INIS)

    Wass, Eva; Nyberg, Goeran

    2010-05-01

    The Aespoe island is situated close to the nuclear power plant of Simpevarp in southeastern Sweden. As part of the pre-investigations preceding excavation of the Aespoe Hard Rock Laboratory, registrations of the groundwater levels and electrical conductivity in packed-off borehole sections and levels in open boreholes started in 1987. The investigations are still ongoing and are planned to continue for a long period of time. As the tunnel excavation went on from the autumn 1990 and onwards, new boreholes were drilled in the tunnel and instrumented to enable groundwater pressure monitoring in packed-off sections. In addition, other hydro-related measurements such as water flow in the tunnel, electrical conductivity of tunnel water and inflow and outflow of water through tunnel pipes have been performed. This report is a summary of the monitoring during 2009. In order to allow for comparison with factors that may influence the groundwater level/pressure and flow, meteorological data are also presented in the report. From the end of 1991, the disturbance from the tunnel is the dominating factor influencing groundwater levels in the area. In one chapter, activities that may have an influence on the ground water situation are listed and briefly discussed

  18. Hydro-Quebec 2005 annual report : people with energy

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec generates, transmits and distributes electricity mainly produced by renewable energy sources. Its sole shareholder is the Quebec government. This annual report reviewed the operations of Hydro-Quebec, and provided data on energy sales, production and details of the utility's environmental programs. Information on Hydro-Quebec subsidiaries in 2005 was presented in the following separate sections: Hydro-Quebec Production; Hydro-Quebec TransEnergie; Hydro-Quebec Distribution; Hydro-Quebec Equipement; and the Societe d'energie de la Baie James. In 2005, Hydro-Quebec Distribution signed contracts for an initial block of 990 MW of wind power and issued a tender call for an additional 2000 MW of wind power. A generator balancing service was created and authorized by the Regie de l'energie. Hydro-Quebec customers have achieved energy savings of nearly 450 GWh in 2005. The commissioning of Toulnustouc generating station was achieved 5 months ahead of schedule. The 526 MW facility will generate 2.7 TWh annually. Work at the Chute-Allard and Rapide-des-Coeurs sites has continued, as well as construction at Mercier and Peribonka and Eastmain-1. Income from continuing operations came to $2.25 billion, a $124 million increase that was attributed to a rise in domestic sales and net short-term exports. The income was offset by higher pension expenses, depreciation and amortization, as well as by cost of supply on external markets and financial expenses. All other operating expenses were lower than in 2004. Capital spending for the transmission system reached its highest level since 1997, with $793 million invested, including $336 million to meet growth. Data on the company's financial performance, executive changes and reorganization were provided. Financial statements included a review and analysis of financial transactions, an auditor's report, as well as customary notes to the consolidated financial statement including balance sheets, assets, liabilities and

  19. Genetically engineered rat gliomas: PDGF-driven tumor initiation and progression in tv-a transgenic rats recreate key features of human brain cancer.

    Directory of Open Access Journals (Sweden)

    Nina P Connolly

    Full Text Available Previously rodent preclinical research in gliomas frequently involved implantation of cell lines such as C6 and 9L into the rat brain. More recently, mouse models have taken over, the genetic manipulability of the mouse allowing the creation of genetically accurate models outweighed the disadvantage of its smaller brain size that limited time allowed for tumor progression. Here we illustrate a method that allows glioma formation in the rat using the replication competent avian-like sarcoma (RCAS virus / tumor virus receptor-A (tv-a transgenic system of post-natal cell type-specific gene transfer. The RCAS/tv-a model has emerged as a particularly versatile and accurate modeling technology by enabling spatial, temporal, and cell type-specific control of individual gene transformations and providing de novo formed glial tumors with distinct molecular subtypes mirroring human GBM. Nestin promoter-driven tv-a (Ntv-a transgenic Sprague-Dawley rat founder lines were created and RCAS PDGFA and p53 shRNA constructs were used to initiate intracranial brain tumor formation. Tumor formation and progression were confirmed and visualized by magnetic resonance imaging (MRI and spectroscopy. The tumors were analyzed using histopathological and immunofluorescent techniques. All experimental animals developed large, heterogeneous brain tumors that closely resembled human GBM. Median survival was 92 days from tumor initiation and 62 days from the first point of tumor visualization on MRI. Each tumor-bearing animal showed time dependent evidence of malignant progression to high-grade glioma by MRI and neurological examination. Post-mortem tumor analysis demonstrated the presence of several key characteristics of human GBM, including high levels of tumor cell proliferation, pseudopalisading necrosis, microvascular proliferation, invasion of tumor cells into surrounding tissues, peri-tumoral reactive astrogliosis, lymphocyte infiltration, presence of numerous tumor

  20. Genotoxicity and antigenotoxicity study of aqueous and hydro-methanol extracts of Spondias mombin L., Nymphaea lotus L. and Luffa cylindrical L. using animal bioassays

    OpenAIRE

    Oyeyemi, Ifeoluwa Temitayo; Yekeen, Olaide Maruf; Odusina, Paul Olayinka; Ologun, Taiwo Mary; Ogbaide, Orezimena Michelle; Olaleye, Olayinka Israel; Bakare, Adekunle A.

    2015-01-01

    Spondias mombin (Linn), Nymphaea lotus (Linn) and Luffa cylindrica (Linn) (syn Luffa aegyptiaca Mill) are plants traditionally used as food ingredients and in the management of diseases, including cancer, in Nigeria. Despite the therapeutic potentials attributed to these plants, reports on their genotoxicity are scanty. In this study, the genotoxicity of the aqueous and hydro-methanol extract of these plants was evaluated using mouse bone marrow micronucleus and sperm morphology assays. Antig...

  1. BC Hydro - IPC review : report on the creation of IPC International Power Corporation and its joint venture with the British Columbia Hydro and Power Authority for the Raiwind power project

    International Nuclear Information System (INIS)

    1997-03-01

    BC Hydro is one of the sponsors involved in the construction of a thermal electric power plant in Raiwind, Pakistan. As a Crown corporation, BC Hydro and its participation in the project is subject to the policies and priorities of the provincial government. This document describes the circumstances surrounding the creation of the International Power Corporation (IPC) and its joint venture with BC Hydro for the development of international power projects including the Raiwind project. The project has provoked much public discussion in British Columbia because of the involvement of Cayman Island companies in the project structure. There is concern with the intermingling of public and private interests in the project, including allegations that an IPC share offering benefited insiders of government and BC Hydro. A description of the history and structure of the Raiwind project and detailed information on the British Columbia participants is provided. Directors and shareholders of the principal corporate participants are listed. The development process in Pakistan, the key features of the project and the underlying agreements among the participants are described. An assessment of potential conflicts of interest and a review of public sector standards and guidelines regarding conflicts of interest is presented. 60 refs., 39 tabs., 6 figs

  2. Twenty-five years of research in hydro-ecology at the EDF research and development division

    International Nuclear Information System (INIS)

    Gosse, Ph.

    1999-01-01

    Hydro-ecology (or aquatic ecology) is the study of aquatic systems in their interacting aspects: physical, chemical and biological. The creation in 1974 of the Environment Department at EDF Research and Development Division marked the start in France of quantitative hydro-ecology applied to power generation installations. The studies developed around several main themes, determined both the expansion of the nuclear programme and by changes in French environmental regulations, in particular the 1976 law on impact studies, the 1984 fishing and hydro-biology law and the 1992 water law. In this framework, he effect of artificial warming of rivers, eutrophication of continental and marine waters, transfers of mineral micro-pollutants and radionuclides in rivers, and problems specific to hydropower installations such as guaranteed in stream flow or fish pass design, have been studies. This work, conducted in collaboration with many other laboratories, has led to the development of original quantitative approaches, notably in the field of numerical modelling. The paper selects several of the tools developed whose scope of application is wider than the environment and management of thermal or hydropower plants. Two major applications grouping the experience acquired in hydro-ecology are presented: the AGIRE software and the global environment study of the Singrauli area in India. (author)

  3. Making the connection: The B.C. Hydro electric system and how it is operated

    International Nuclear Information System (INIS)

    1993-01-01

    British Columbia Hydro supplies electric energy to 93% of the province's population through an integrated electric system. Of the electricity supplied, 95% is generated at 29 hydroelectric plants, with the remainder coming from thermal plants burning fossil fuels. BC Hydro's high voltage transmission and distribution network consists of 17,600 km of lines 60 kV and above and 51,400 km of lines below 60 kV. A description of system operations begins with the principles of hydroelectric generation, with a brief note on thermal generation for peaking or short-term energy production. Non-power operations measures designed to minimize environmental impacts and enhance social benefits are also outlined along with electricity trade with other provinces and the USA. Planning of long- and short-term system operations is also reviewed. An analysis of system components is presented for the Peace, Columbia, Lower Mainland/Coastal/Fraser, and Vancouver Island regions. Finally, information is given on the 29 hydroelectric and 3 thermal plants, including drainage basin, reservoir description and map, inflow, capacity, turbine type, storage, operating constraints, and average energy capability. 51 figs

  4. Study on analgesic and anti-inflammatory properties of Cordia myxa fruit hydro-alcoholic extract.

    Science.gov (United States)

    Ranjbar, Mohammadmehdi; Varzi, Hossein Najafzadeh; Sabbagh, Atefeh; Bolooki, Adeleh; Sazmand, Alireza

    2013-12-15

    Cordia myxa is a plant which is used in tropical regions of the world. Analgesic and anti-inflammatory effect of fruit of this medicinal plant was investigated in mice. Hydro-alcoholic extract of it was prepared by maceration method. Formalin test was conducted in six groups of mice (6 animals in each group) and acetic acid test in another six groups (6 mice). Groups one to six in each test were administered normal saline, oral indomethacin, intraperitoneal tramadol, 100 mg kg(-1) oral extract, 200 mg kg(-1) oral extract and 100 mg kg(-1) intraperitoneal extract, respectively. The duration of foot lickings were calculated in formalin- administered (1st) group within min 0 to 5 (acute phase) and 15 to 25 (chronic phase). Acetic acid-induced writhings were counted within 10 min in the 2nd group. The results showed that hydro-alcoholic extract of Cordia myxa fruit was considerably effective in formalin test. Also, analgesic and anti-inflammatory properties of this plant's fruit in both acute and chronic phase are somewhat similar to these properties in the study on animal model of experimental colitis.

  5. Times are changing, Hydro-Quebec multiplies its assets

    International Nuclear Information System (INIS)

    Lefevre, M.

    1997-01-01

    Hydro-Quebec''s advance into the North American and world multi-energy market began with the purchase of an interest in the natural gas holding company Noverco, a commercial partnership with Gaz de France, and marketing agreements with Enron and Trigen in the United States. Hydro-Quebec, the world''s sixth largest electric utility, aims to become a multi-energy enterprise selling not only electricity, but also natural gas, oil and certain renewable forms of energy. Currently, Hydro-Quebec is licensed to make border sales of electricity at regulated prices. Through the US Federal Energy Regulatory Commission (FERC), Hydro-Quebec will be able also to sell electricity through wholesale spot contracts with electricity marketers such as Trigen and Enron

  6. Full cost accounting for decision making at Ontario Hydro

    International Nuclear Information System (INIS)

    Plagiannakos, T.

    1996-01-01

    Ontario Hydro's approach to full cost accounting (FCA) was outlined in response to questions raised earlier, in another forum, regarding Ontario Hydro's views on FCA. FCA was defined as an evaluation framework (as opposed to an accounting system) which tries to account for the internal (private) as well as the external (environment and human health) costs and benefits and integrate them into business decisions. When the external impacts cannot be monetized, qualitative evaluations are used based on the damage costing approach, which Ontario Hydro prefers to the cost of control method recommended by its critics. In general, however, Ontario Hydro is not opposed to FCA in so far as it puts the Utility in a better position to make more informed decisions, improve environmental cost management, avoid future costs, enhance revenue, improve environmental quality, contribute to environmental policy, and contribute to sustainable development. 1 fig

  7. Methodology for the selection of alternatives to the waterfall division of hydro graphical basin, considering environmental impacts

    International Nuclear Information System (INIS)

    Cunha, S.H.F. da; Pires, S.H.; Rovere, E.L. La; Pereira, M.V.F.

    1993-01-01

    This paper presents the many stages of a new methodology propose to selection of alternatives of waterfall division of hydro graphical basin considering environmental impacts. The methodology uses the techniques of hierarchical analysis in evaluation of environmental impacts, simulation the individualized power plants in energy evaluation and multi-objective analysis in selection of better alternative of division of basin waterfall. The methodology still foresee moments and mechanisms to take into account the opinion of different social sectors. (C.M.)

  8. Hydro-Quebec strategic plan 2006-2010

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec produces, transmits and distributes electricity through the use of renewable energy sources, particularly hydroelectricity. It also conducts research in energy related fields. This document listed the strategic plan for Hydro-Quebec's 4 main divisions: Hydro-Quebec Production, Hydro-Quebec TransEnergie, Hydro-Quebec Distribution and Hydro-Quebec Energy Society of Bay James. The 2006 to 2010 strategic plan continues to focus on 3 main priorities: energy efficiency; complementary development of hydroelectricity and wind power; and, technological innovation. Hydro-Quebec's objectives also include strengthening the security of Quebec's energy supply and making use of energy as a lever for economic development. The plan for Hydro-Quebec Production calls for accelerating the development of major hydroelectric projects and promoting other renewable forms of energy such as wind power and ensuring the efficiency and reliability of the generating fleet. The utility's objective is to reach 4.7 TWh in energy savings by 2010 and to work toward a target of 8 TWh by 2015. The plan also involves a portfolio of hydroelectric projects totaling 5,400 MW. The plan includes complementary development and integration of 4,000 MW of windpower by 2015. The plan for Hydro-Quebec TransEnergie calls for system reliability and becoming a world benchmark for quality and reliability in wind power integration and deployment of new technologies to enhance performance. The plan for Hydro-Quebec Distribution calls for more efficient use of electricity, increase customer satisfaction and meet electricity needs through the use of renewable energy sources. The utility has made a commitment for 2006 to 2010 to a net income of $2.5 billion per year for a total of $12.5 billion, and a capital investment of 19.4 billion. This paper outlined the contribution of each division to net income and listed the economic benefits for the 2006 to 2010 period. In 2006, the Quebec Energy Board authorized

  9. Pico hydro turbines for electricity in rural areas

    OpenAIRE

    Descotte, Gérard

    2016-01-01

    This article discusses the feedback and lessons learned, particularly from a survey carried out following the deployment program of a pico hydro power solution in a very isolated rural area in north Laos. This project is part of the strategic development for the rural electrification of Laos, in which pico hydro power facilities constitute the main avenue of progress for the electrification of isolated villages.

  10. BLUE GOLD: HYDRO-ELECTRIC RENT IN CANADA

    OpenAIRE

    Glenn Jenkins; RICHARD ZUKER

    1984-01-01

    In this study, an attempt is made to develop estimates of the value of economic rent from production of hydro-electricity. These estimates are made for the year 1979, which is the latest period for which a comprehensive set of data was available at the time this work was undertaken. The estimates are developed for the hydro-electricity generated (or used) by electric utilities in four provinces: Quebec (including Churchill Falls), Ontario, Manitoba and British Columbia. These electric systems...

  11. New directions in nuclear waste disposal in Ontario Hydro

    International Nuclear Information System (INIS)

    Nash, K.

    1996-01-01

    Ontario Hydro Nuclear has financial, environmental, safety and public acceptance business objectives which must be met to achieve long term sustainable success. Short term objectives of achieving nuclear excellence in safety, cost and production are vital to this success. Ontario Hydro's nuclear waste and decommissioning liabilities must be managed within these objectives. This paper outlines the financial environmental and societal considerations and responsibility framework for managing these liabilities. (author)

  12. The Flakt-Hydro process: flue gas desulfurization by use of seawater

    Energy Technology Data Exchange (ETDEWEB)

    Xia, W.Z. [ABB China Limited, Shanghai (China)

    1999-07-01

    ABB's seawater scrubbing process (the Flakt-Hydro process) for flue gas desulfurization has recently triggered interest among power producers because of its simple operating principle and high reliability. The process uses seawater to absorb and neutralize sulfur dioxide in flue gases. The absorbed gas is oxidized and returned to the ocean in the form it originated in the first place, namely as dissolved sulfate salts. The process uses the seawater downstream of the power plant condensers. This paper gives an introduction to the basic principle of the process and presents some of the recent power plant applications, namely at the Paiton Private Power Project; Phase 1 (2 x 670 MWe) in Indonesia and at the Shenzhen West Power Plant, Unit 2 (300 MWe) in China.

  13. Small-scale hydro-electric scheme in Roches, Switzerland

    International Nuclear Information System (INIS)

    Hausmann, M.

    2006-01-01

    The small hydropower plant (SHPP) project 'PCH Roches' is planned to be built in Roches, a small village located in the Jura region of the canton of Bern. The goal of this undertaking is to reactivate a site with hydro potential of the river Birs on a section that was already well exploited by some ancient SHPP (since 1953 or probably even earlier). Several modifications were performed on this plant over the years; not all contributed positively on its production figures. Following a transfer of the water rights in 1987, claims became loud against the owner to perform maintenance on the river banks and to modify the weir such that a free passage for the fishes will be granted. Those issues contributed to inflate a conflict which ended in the repeal of the water rights and a total plant shut down in 2001. The new project plans to reuse the existing pen stock and to carry out some refurbishing activities to grant security and better performance. The weir and the intake structure are also redesigned such that the water storage can be somewhat raised for normal operation; a weir gate will however allow to better discharge the river in flood situations. A new turbine house will be erected at the current location where the tail water pen stock rejoins the river. Hence, the existing old turbine house will be obsolete and the upper and lower pen stock sections are to be linked with each other. Limited by the existing pen stock size, the new plant is expected to produce some 50 kW power and 362,000 kWh/year. This represents an increase in energy generation of around 200% compared with the ancient SHPP. Gross head is 5.38 m, net head 4.12 m with a turbine flow of at least 1.6 m 3 /s. The expected energy sales price applicable to this project reaches about 0.17 CHF/kWh as per the current tariffs set by the grid owner. This project calls for the building of a state-of-the-art SHPP. It will avoid the total dismantling of the existing works to take place and allow the small

  14. Role of model structure on the response of soil biogeochemistry to hydro-climatic fluctuations

    Science.gov (United States)

    Manzoni, S.; Porporato, A.

    2005-05-01

    Soil carbon and nutrient cycles are strongly affected by hydro-climatic variability, which interacts with the internal ecosystem structure. Here we test the implications of biogeochemical model structure on such dynamics by extending an existing model by the authors and coworkers. When forced by hydro-climatic fluctuations, the different model structures induce specific preferential nutrient paths among the soil pools, which in turn affect nutrient distribution and availability to microbes and plants. In particular, if it is assumed that microbes can directly assimilate organic nitrogen, plants tend to be inferior competitors for nutrients even in well-watered conditions, while if a certain amount of organic nitrogen is assumed to be mineralized without being first incorporated into microbial cells, vegetation can be advantaged over a wide range of soil moisture values. We also investigate the intensification of competition for nutrients (e.g., nitrogen) between plant and soil microbial communities under extreme hydrologic conditions, such as droughts and intense storms. Frequent rainfall events may determine ideal soil moisture conditions for plant uptake, enhancing nitrogen leaching while lowering oxygen concentration and inhibiting microbial activity. During droughts, the soil water potential often drops to the point of hampering the plant nutrient uptake while still remaining high enough for microbial decomposition and nitrogen immobilization. The interplay of microbe and vegetation water stress is investigated in depth as it controls the ability of one community (e.g., plants or soil microbes) to establish competitive advantage on the other. The long-term effects of these dynamics of competition and nutrient allocation are explored under steady-state and stochastic soil moisture conditions to analyze the feedbacks between soil organic matter and vegetation dynamics.

  15. Annual radiological environmental operating report: Browns Ferry Nuclear Plant, 1992

    International Nuclear Information System (INIS)

    1993-04-01

    This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of Browns Ferry Nuclear Plant (BFN) in 1992. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. Small amounts of Co-60 and Cs-134 were found in sediment samples downstream from the plant. This activity in stream sediment would result in no measurable increase over background in the dose to the general public

  16. Development and applications of reactor noise analysis at Ontario Hydro's CANDU reactors

    International Nuclear Information System (INIS)

    Gloeckler, O.; Tulett, M.V.

    1995-01-01

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro's CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  17. Environmental flows in hydro-economic models

    Science.gov (United States)

    Pereau, Jean-Christophe; Pryet, Alexandre

    2018-03-01

    The protection of environmental flows, as a management objective for a regulating agency, needs to be consistent with the aquifer water balance and the degree of resource renewability. A stylized hydro-economic model is used where natural recharge, which sustains environmental flows, is considered both in the aquifer water budget and in the welfare function as ecosystem damage. Groundwater recharge and the associated natural drainage may be neglected for aquifers containing fossil water, where the groundwater is mined. However, when dealing with an aquifer that constitutes a renewable resource, for which recharge is not negligible, natural drainage should explicitly appear in the water budget. In doing so, the optimum path of net extraction rate does not necessarily converge to the recharge rate, but depends on the costs associated with ecosystem damages. The optimal paths and equilibrium values for the water volume and water extraction are analytically derived, and numerical simulations based on the Western La Mancha aquifer (southwest Spain) illustrate the theoretical results of the study.

  18. Prepared by Thermal Hydro-decomposition

    Science.gov (United States)

    Prasoetsopha, N.; Pinitsoontorn, S.; Kamwanna, T.; Kurosaki, K.; Ohishi, Y.; Muta, H.; Yamanaka, S.

    2014-06-01

    The polycrystalline samples of Ca3Co4- x Ga x O9+ δ (0 ≤ x ≤ 0.15) were prepared by a simple thermal hydro-decomposition method. The high density ceramics were fabricated using a spark plasma sintering technique. The crystal structure of calcined powders was characterized by x-ray diffraction. The single phase of Ca3Co4- x Ga x O9+ δ was obtained. The scanning electron micrograph illustrated the grain alignment perpendicular to the direction of the pressure in the sintering process. The evidence from x-ray absorption near edge spectra were used to confirm the oxidation state of the Ga dopant. The thermoelectric properties of the misfit-layered of Ca3Co4- x Ga x O9+ δ were investigated. Seebeck coefficient tended to decrease with increasing Ga content due to the hole-doping effect. The electrical resistivity and thermal conductivity were monotonically decreased with increasing Ga content. The Ga doping of x = 0.15 showed the highest power factor of 3.99 × 10-4 W/mK2 at 1,023 K and the lowest thermal conductivity of 1.45 W/mK at 1,073 K. This resulted in the highest ZT of 0.29 at 1,073 K. From the optical absorption spectra, the electronic structure near the Fermi level show no significant change with Ga doping.

  19. Hydro-Quebec annual report 1995

    International Nuclear Information System (INIS)

    1995-01-01

    Progress in providing services, in financial and human relations management aspects, and future outlook for Hydro-Quebec was summarized in the 1995 annual report. Environmental policy of the Corporation was updated to reflect international concepts of sustainable development and environment management. A program was launched to remove, recycle and eliminate contaminants. Although generating systems will not be expanded between 1997 and the year 2000, existing generating facilities will be revitalized to improve their capacity and performance. As part of aggressive marketing of surplus capacity abroad, the creation during the past year of the first U.S. subsidiary, HQ Energy Services, was announced. Net income for the year was reported at $390 million, decreased by $277 million since 1994, due to financial pressure created by the commissioning of installations, including those at Phase II of the La Grande complex, and the slowdown in electricity sales in Quebec. A net income of close to $500 million was forecast for 1996. To achieve this target the Corporation announced plans to reduce operating expenses, an exercise which will include staff reductions and a wage freeze. tabs., figs

  20. Ekstraksi Minyak Atsiri Dari Akar Wangi Menggunakan Metode Steam - Hydro distillation dan Hydro distilation dengan Pemanas Microwave

    Directory of Open Access Journals (Sweden)

    Maulana M Al Hanief

    2013-09-01

    Full Text Available Penelitian ini bertujuan untuk memperoleh minyak atsiri dari akar wangi dengan modifikasi metode steam-hydro distillation dan hydro distillation yaitu menggunakan pemanasan microwave kemudian membandingkan hasilnya dengan penelitian sebelumnya. Modifikasi ini diharapkan lebih efisien dalam masalah lama penyulingan dan kualitas serta kuantitas rendemen minyak yang lebih baik dan banyak. Penelitian ini menggunakan dua metode yaitu steam-hydro distillation dan hydro distillation dengan pemanfaatan gelombang mikro. Bahan baku yang digunakan dalam penelitian adalah akar wangi jenis pulus wangi yang tumbuh di Kabupaten Garut, Jawa Barat. Variabel yang digunakan adalah bahan baku yang dicacah dan bahan baku utuh dengan variasi massa bahan 50 gr, 60, gr, 70 gr, 80 gr, dan 90 gr dengan pelarut air sebanyak 450 ml dalam labau distiller berukuran 1000 ml. Lama penyulingan adalah lima jam dengan pengamatan tiap 30 menit serta daya yang digunakan adalah 400 Watt. Analisa terhadap hasil minyak atsiri yang diperoleh antara lain analisa GC-MS, spesific gravity, indeks bias, dan bilangan asam. Hasil dari penelitian ini dibandingkan dengan hasil penelitian terdahulu yang tidak memanfaatkan gelombang mikro. Dari hasil penelitian diperoleh % rendemen kumulatif, sifat fisik, sifat kimia, dan kandungan komponen minyak dari metode steam-hydro distillation lebih baik dibandingkan metode hydro distillation ditandai dengan kuantitas dan kualitas yang sesuai dengan SNI.  Sementara itu jika dibandingkan dengan metode terdahulu dapat disimpulkan bahwa penggunaan gelombang mikro lebih efisien dalam waktu dan kuantitas serta kualitas minyak yang lebih baik dibandingkan tanpa penggunaan gelombang mikro

  1. Deconstructing hydro: the BC electricity sector in this decade

    International Nuclear Information System (INIS)

    Jaccard, M.

    2001-01-01

    This paper provided speculation regarding the world-wide trend to deregulate electric utilities with particular focus on power deregulation in British Columbia. The four main issues facing electricity reform in British Columbia are to determine if publicly-owned assets should be privatised, how to achieve competitive electricity commodity prices in a de-regulated generation market, to determine the extent to which customers will be allowed direct access to sellers of electricity, and to determine which changes in industry structure are needed to ensure that control over the common carrier does not hinder fair competition. BC Hydro recently issued a plan for the next decade entitled the Integrated Electricity Plan which suggests that almost all growth in supply on the Hydro system will be limited to a few large projects totalling 900 megawatts, to be owned and operated by either BC Hydro or by the Columbia Power Corporation, another Crown entity. This plan is in complete contrast to the evolution of the electricity industry nearly everywhere else in the world where demand growth is being met almost entirely by small- and medium-scale non-utility resources issuing from competitive markets with minimal public funding. This article looks at why BC Hydro will probably be transformed significantly, even dismantled, in the coming decade. The article begins with a section explaining the cause and effects of major changes in the world-wide electricity industry. This is followed by a section reviewing what BC Hydro did in the 1990s while reform was taking place. The article also describes what BC Hydro intends to do in the next decade and explores reasons why this outcome is unlikely. The final section of the article provides an alternative vision of BC Hydro's future over the next decade. 1 tab., 3 figs

  2. Overview of Hydrometeorologic Forecasting Procedures at BC Hydro

    Science.gov (United States)

    McCollor, D.

    2004-12-01

    Energy utility companies must balance production from limited sources with increasing demand from industrial, business, and residential consumers. The utility planning process requires a balanced, efficient, and effective distribution of energy from source to consumer. Therefore utility planners must consider the impact of weather on energy production and consumption. Hydro-electric companies should be particularly tuned to weather because their source of energy is water, and water supply depends on precipitation. BC Hydro operates as the largest hydro-electric company in western Canada, managing over 30 reservoirs within the province of British Columbia, and generating electricity for 1.6 million people. BC Hydro relies on weather forecasts of watershed precipitation and temperature to drive hydrologic reservoir inflow models and of urban temperatures to meet energy demand requirements. Operations and planning specialists in the company rely on current, value-added weather forecasts for extreme high-inflow events, daily reservoir operations planning, and long-term water resource management. Weather plays a dominant role for BC Hydro financial planners in terms of sensitive economic responses. For example, a two percent change in hydropower generation, due in large part to annual precipitation patterns, results in an annual net change of \\50 million in earnings. A five percent change in temperature produces a \\5 million change in yearly earnings. On a daily basis, significant precipitation events or temperature extremes involve potential profit/loss decisions in the tens of thousands of dollars worth of power generation. These factors are in addition to environmental and societal costs that must be considered equally as part of a triple bottom line reporting structure. BC Hydro water resource managers require improved meteorological information from recent advancements in numerical weather prediction. At BC Hydro, methods of providing meteorological forecast data

  3. Volume reduction/solidification of liquid radioactive waste using bitumen at Ontario hydro's Bruce nuclear generating station open-quotes Aclose quotes

    International Nuclear Information System (INIS)

    Day, J.E.; Baker, R.L.

    1994-01-01

    Ontario Hydro at the Bruce Nuclear Generating Station open-quotes Aclose quotes has undertaken a program to render the station's liquid radioactive waste suitable for discharge to Lake Huron by removing sufficient radiological and chemical contaminants from five different plant waste streams. The contaminants will be immobilized and stored at on-site radioactive waste storage facilities and the purified streams will be discharged. The discharge targets established by Ontario Hydro are set well below the limits established by the Ontario Ministry of Environment (MOE) and are based on the Best Available Technology Economically Achievable Approach (B.A.T.E.A.). ADTECHS Corporation has been selected by Ontario Hydro to provide volume reduction/solidification technology for one of the five waste streams. The system will dry and immobilize the contaminants from a liquid waste stream in emulsified asphalt using thin film evaporation technology

  4. Monitoring Systems for Hydropower Plants

    Directory of Open Access Journals (Sweden)

    Damaschin Pepa

    2015-07-01

    Full Text Available One of the most important issue in hydro power industry is to determine the necessary degree of automation in order to improve the operation security. Depending upon the complexity of the system (the power plant equipment the automation specialist will build a philosophy of control following some general principals of security and operation. Helped by the modern digital equipment, today is relative easy to design a complete monitoring and supervising system including all the subparts of a hydro aggregate. A series of sensors and transducers specific for each auxiliary installation of the turbine and generator will be provided, together with a PLC or an industrial PC that will run an application software for implementing the security and control algorithms. The purpose of this paper is to offer a general view of these issues, providing a view of designing an automation & control and security system for hydro power plants of small, medium and big power.

  5. Modelling of hydro and wind power in the regulation market

    International Nuclear Information System (INIS)

    Kiviluoma, J.; Holttinen, H.; Meibom, P.

    2006-01-01

    The amount of required regulation capacity in the power system is affected by the wind power prediction errors. A model has been developed which can evaluate the monetary effects of prediction errors. The model can be used to evaluate (1) the regulation costs of wind power, (2) regulation market prices including effects related to the participation of power producers in the regulating power market, (3) value of accurate wind forecasts and (4) the effect of decreasing the length of the spot market clearance. This article discusses the problems related to developing a realistic model of the regulating power market including the interaction between the spot market and the regulating power market. There are several issues that make things complicated. (1) How to calculate the minimum amount of needed secondary (minute) reserves. Traditionally the Nordic TSOs have used an N-1 criteria in each country to determine the required amounts of positive secondary reserve, but as installed wind power capacity grows, it will become relevant to include the wind power prediction errors in the estimation of secondary reserves. (2) Consumption forecast errors and plant outages also contribute to activation of regulating power and should have stochastic input series besides wind power. (3) Risk premiums and transaction costs in the regulating power market are difficult to estimate as well as the effects of the possible use of market power. This is especially true in the Nordic system with the high share of hydro power, since the water value and hydrological limitations make things more complex than in a thermal system. (4) The available regulation capacity is not necessarily equal to the truly available capacity. All producers don't participate in the regulation market although in principle they could. (orig.)

  6. Hydro-Quebec to complete series compensation protection by 1995

    Energy Technology Data Exchange (ETDEWEB)

    Champagne, L

    1991-09-01

    Hydro-Quebec's 735-kV transmission system is characterized by remote hydroelectric power plants located far north of main load centers, making it difficult to maintain dynamic stability of the system in the case of faults. The utility is planning to install series compensation on its 735-kV network from 1992 to 1995 in order to correct for the reactive impedance of the transmission lines, thereby removing load electrically closer to the points of generation. Series compensation in the form of capacitor banks with overvoltage protection will be installed at line ends and will replace large numbers of conventional electromagnetic or electronic distance relays currently used as line protection equipment. Three Manicouagan-Levis lines and the Micoua-Laurentides line will be center-compensated at 17%. A total of thirty-seven 735-kV lines will be series-compensated at ca 40%. Two separate sets of tests were conducted to select the new series compensation system. Following a market study, eight systems of line protection relays were selected as most likely to operate on a series compensated system. All were performance tested on a transient network analyzer in a simulation involving all components of the 735-kV system with some exceptions. Relays singled out in standard tests were put to a series of more specific tests on the Abitibi-LaVerendrye line, where the largest number of relay malfunctions had been recorded. A current differential relay and a superimposed directional relay were recommended as the two primary protective systems to be installed. Backup protection will be provided by using one of the distance relays with memory polarization. 3 figs.

  7. Refurbishment of small hydropower plants in Romania; Sanierung von Kleinwasserkraftwerken in Rumaenien

    Energy Technology Data Exchange (ETDEWEB)

    Gmeinbauer, Joerg [Wien Energie GmbH, Wien (Austria)

    2010-07-01

    In 2008 Wien Energie subsidiary Wienstrom GmbH participated in three public auctions of Hidroelectrica S.A. for the sale of old small hydro power plants in Romania. Together with strategic partners Wienstrom could successfully compete against local and international competition and acquired 31 small hydro power plants with a total installed capacity of around 20 MW. The plants were integrated into the newly established Vienna Energy Forta Naturala Srl. and are being completely refurbished at the moment. Wien Energie consequently is already the third largest operator of small hydro power plants in Romania. (orig.)

  8. Re-potentiation of hydro-generators: a proposal of analysis and implementation methodology; Repotenciacao de hidrogeradores: uma proposta de metodologia de analise e implantacao

    Energy Technology Data Exchange (ETDEWEB)

    Sa, Fabio Salomao Fernandes

    1996-07-01

    The hydro-generators suffer during its operative useful life a combination of stresses of nature thermal, electric, mechanics and environmental. With the time, they are going losing the capacity to support those stresses and the power plants suffer, more and more frequently, undesirable stops for repair services and maintenance. In function of the high costs incurred with these stopped, the operation of the power plant can be economically impracticable. That unavailability of the generation for the electric system, it results in reduction of the reliability, burdening the politics of load ruling. The re-potentiation is a proposal that seeks to extend the useful life of hydro-generators, at the same time that it try to rescue the reliability and the readiness of the plant, with larger power. The power increase is usually made possible, or for the surplus of the hydro resources in excess, or for the reduction of the losses of all the components of the energy flow. That work proposes a methodology structured starting from the estimate of the potential, of rising of data, of the basic project and of the executive project. Modern techniques of engineering, new processes and new materials, allow the re-potentiation of those hydro-generators returning them new useful life, under conditions economically justifiable.

  9. Hydro in China: Sino-Canadian cooperation

    International Nuclear Information System (INIS)

    Wiebe, P.A.; Webb, N.K.

    1988-01-01

    Despite a population of over 1 billion, China's installed electric generating capacity is similar to Canada's. To help alleviate the energy shortfalls, the government's seventh 5 year plan (1985-1990) calls for annual installation of new capacity of ca 7,000 MW, the equivalent of a James Bay and Churchill Falls complex every two years. In the short term, 2/3 of new capacity will be filled by thermal stations, but in the longer term, China will turn to its huge undeveloped hydroelectric generating capacity. Information is presented on China's hydroelectric resources, and four hydro projects currently under development in conjunction with Canadian International Project Managers (CIPM), a company whose members are Acres International Inc. of Toronto, Lavalin International Inc. of Montreal and S.N.C. Inc. of Montreal. The Zhao Ping project is a conventional 200 MW project on the Gui River in Guangxi Province in south China, comprising a 73 m high concrete gravity dam and spillway. The Gehe Yan comprises a 151 m high concrete gravity arch dam and spillway and a 1,200 MW powerhouse. The Longtan project would be a 215 m high concrete rockfaced dam with ten 500 MW units and an inclined shiplift with a 500 tonne vessel capacity. The Three Gorges is a multi-purpose water control project that will provide flood control to the regions on the middle reaches of the Yangtze, generate over 8,300 MW of power, and improve navigation on the Yangtze River as far as Chongqing. Up to 750,000 people will have to be resettled to higher land within the river valley. 4 figs., 2 tabs

  10. Hydro-climatic conditions and thermoelectric electricity generation – Part I: Development of models

    International Nuclear Information System (INIS)

    Koch, Hagen; Vögele, Stefan

    2013-01-01

    In recent years there have been several heat waves affecting the use of thermoelectric power plants, e.g. in Europe and the U.S. In this paper the linkage between hydro-climatic conditions and possible electricity generation restrictions is described. The coupling of hydrological models and a power plant model is presented. In this approach each power plant is considered separately with its technical specifications. Also environmental regulations, e.g. permissible rise in the cooling water temperature, are considered for the respective power plant. The hydrological models developed to simulate river runoff and water temperature are also site specific. The approach presented is applied to Krümmel nuclear power plant in Germany. Analysed are the uncertainties with regard to electricity generation restrictions on account of climatic developments and corresponding higher water temperatures and low flows. Overall, increased water temperatures and declining river runoff lead to more frequent and more severe generation restrictions. It is concluded that the site-specific approach is necessary to reliably simulate power plants water demand, river runoff and water temperature. Using a simulation time step of one day, electricity generation restrictions are significantly higher than for simulations at monthly time step. - Highlights: • An approach to assess climate effects on electricity generation is presented. • Site specific models for power plants, water temperature and discharge are used. • Monthly and daily simulation time-steps give different results. • Climate change effects on generation depend on cooling system and climate scenario

  11. Annual radiological environmental operating report: Sequoyah Nuclear Plant, 1987

    International Nuclear Information System (INIS)

    1988-04-01

    This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of the Sequoyah Nuclear Plant in 1987. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. 2 figs., 2 tabs

  12. The HydroShare Collaborative Repository for the Hydrology Community

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of, and collaboration around, "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting our approach to making this system easy to use and serving the needs of the hydrology community represented by the Consortium of Universities for the Advancement of Hydrologic Sciences, Inc. (CUAHSI). Metadata for uploaded files is harvested automatically or captured using easy to use web user interfaces. Users are encouraged to add or create resources in HydroShare early in the data life cycle. To encourage this we allow users to share and collaborate on HydroShare resources privately among individual users or groups, entering metadata while doing the work. HydroShare also provides enhanced functionality for users through web apps that provide tools and computational capability for actions on resources. HydroShare's architecture broadly is comprised of: (1) resource storage, (2) resource exploration website, and (3) web apps for actions on resources. System components are loosely coupled and interact through APIs, which enhances robustness, as components can be upgraded and advanced relatively independently. The full power of this paradigm is the

  13. Impact of flocculation on flotation tailing's hydro-cycloning properties

    Directory of Open Access Journals (Sweden)

    Knežević Dinko N.

    2014-01-01

    Full Text Available Research results of hydro-cycloning of flocculated and non-flocculated flotation tailing from the lead and zinc open pit mine 'Suplja stijena', Sula - Montenegro have been shown in this paper. Reason for this research was finding conditions in order to separate fraction that is suitable for embankment erection. Flotation tailings has been tested in the very state that it goes out from the flotation process and tailings which is flocculated by anionic flocculant. The object was to determine the impact of flocculation on properties of hydro-cycloning products and disposal process. In hydro-cycloning process greater underflow mass is being separated with non-flocculated tailing. Values of geomechanical parameters are significantly different, especially hydro-cyclone's underflow. All geomechanical parameters of hydro-cyclone's underflow are suitable for erecting embankment which shall be made from non-flocculated tailing. Underflow drainage of non-flocculated tailing is faster while overflow drainage is slower and problematic with both tailings.

  14. Optimizing Hydro Power Turbines in Order to Secure the Passage of Fishes in Khuzestan province

    Directory of Open Access Journals (Sweden)

    Moona Mohammadi

    2015-04-01

    Full Text Available Nowadays,it is important to consider environmental issues,as ecological problems and their severe effect intensify in Iran,particularly in Khuzestan province.The environmental effects of hydroelectric plants are highly regarded due to their significant impact on an extensive area.The lack of safe path for fish passing through the turbines is one of these damages. In order to deal with these challenges,researchers are trying to optimize hydro power turbines.In this optimization,old runners were replaced,while conditions of fish passing through the turbines and fish survival have been improved.Considering the existence of six hydroelectric power plants in Khuzestan province,it would be possible to conduct optimization or constructing studies with a fish-friendly approach for the safe passage of fishes to slightly reduce the extent of environmental damages.

  15. A long-term analysis of pumped hydro storage to firm wind power

    International Nuclear Information System (INIS)

    Foley, A.M.; Leahy, P.G.; Li, K.; McKeogh, E.J.; Morrison, A.P.

    2015-01-01

    Highlights: • This is a long term generation analysis of a high wind power system. • A high CO 2 and fossil fuel price is closest to Ireland’s EU ETS 2020 target. • New pumped storage to firm wind is limited unless strong market costs exist. • Reserve for wind power show that ancillary services are relevant for balancing. - Abstract: Although pumped hydro storage is seen as a strategic key asset by grid operators, financing it is complicated in new liberalised markets. It could be argued that the optimum generation portfolio is now determined by the economic viability of generators based on a short to medium term return on investment. This has meant that capital intensive projects such as pumped hydro storage are less attractive for wholesale electricity companies because the payback periods are too long. In tandem a significant amount of wind power has entered the generation mix, which has resulted in operating and planning integration issues due to wind’s inherent uncertain, varying spatial and temporal nature. These integration issues can be overcome using fast acting gas peaking plant or energy storage. Most analysis of wind power integration using storage to date has used stochastic optimisation for power system balancing or arbitrage modelling to examine techno-economic viability. In this research a deterministic dynamic programming long term generation expansion model is employed to optimise the generation mix, total system costs and total carbon dioxide emissions, and unlike other studies calculates reserve to firm wind power. The key finding of this study is that the incentive to build capital-intensive pumped hydro storage to firm wind power is limited unless exogenous market costs come very strongly into play. Furthermore it was demonstrated that reserve increases with increasing wind power showing the importance of ancillary services in future power systems

  16. BC Hydro's business plan: a summary of BC Hydro's strategic business plan and performance measures

    International Nuclear Information System (INIS)

    2000-04-01

    This document contains a summary of BC Hydro's Strategic Plan and performance measures. The plan has been prepared in response to the recommendations of the Budget Process Review Panel, convened by the BC Government, which recommended that each public body, crown corporation, and other agencies of government, prepare an annual three year business plan. The document reviews the utility's current situation, provides an outline of the company's vision of its role, its mission and values, its strategic objectives (effective governance, efficiency and productivity; service excellence and value-added solutions; market development ; strong and capable organization) and the tools to be utilized in measuring performance. Various strategic issues (financial resources, the need to protect and enhance the value of electricity trading; the impact of information technology; power technology development; environmental trends and 'green energy' initiatives; workforce training and development) are also highlighted

  17. Micro-hydro power: reviewing an old concept

    Energy Technology Data Exchange (ETDEWEB)

    Alward, R.; Eisenbart, S.; Volkman, J.

    1979-01-01

    This informaion package has been prepared to respond to an increasing number of requests for information on micro-hydro systems. It contains a resource directory, which is an attempt to put the reader in contact with the literature, plans, people, and companies appropriate to needs. On a world-wide basis, small-scale, environmentally benign, mechanical, and electrical hydropower systems are common. These are the systems for individual homes, farm, and shop use and generally have power outputs less than 100 kW. For convenience in terminology, this scale of hydro power is referred to as micro-hydro. A decision tree is first presented followed by information on determining the suitability of th site, equipment, economics, sources for financial assistance, regulatory conflicts, cautions and suggestions for the Do-It-Yourselfer, and the Self-Installer, manufacturers and suppliers, and sources of professional services. An annotated bibliography of 16 references is provided. (MCW)

  18. Hydro-Quebec line crew returns home from Haiti

    Energy Technology Data Exchange (ETDEWEB)

    Horne, D.

    2005-04-01

    This article recounted the experience of a 14-member Hydro-Quebec line crew and support group that travelled to Haiti in November 2004 to help re-establish essential electricity services. The work was conducted together with Electricite d'Haiti (EDH). The team installed 400 poles, 10 km of conductors and 85 transformers, restoring service to water pumps; La Providence and Raboteau hospitals; a centre housing Doctors without borders; a CARE distribution centre; and several convents and schools. The installation of street lights at strategic points allowed lighting to be restored in several districts of Gonaives. Hydro-Quebec was able to extend their mission to Haiti and purchase more poles and transformers with the help of a $500,000 contribution from the Canadian International Development Agency. Hydro-Quebec was the only company who came to the aid of EDH. The total budget for the project was $4 million. 2 figs.

  19. Hydro-Quebec opens up, expects positive reaction from FERC

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1997-01-01

    Hydro-Quebec Energy Services US (HQUS), the marketing arm of Hydro-Quebec, amended its application for a power marketing licence with the Federal Energy Regulatory Commission (FERC), by offering to open up five per cent of the wholesale Quebec electricity market to competition. The Corporation hopes that its revised application will satisfy FERC to grant HQUS a power marketer licence, with the right to sell electricity in the US at market-based rates. Hydro-Quebec insiders believe that in addition to opening up the market to competition, thereby equalizing market conditions on both sides of the border, the Corporation's chances of receiving the licence also have been improved by the creation of the provincial energy board (Regie de l'energie) which in future will regulate electricity and gas transmission through Quebec, and establish transmission tariffs. FERC ruling is expected within 60 days of the March 7, 1997 amended application

  20. Environmental impact and benefit from hydro-energy: Bulgarian case

    International Nuclear Information System (INIS)

    Vesselinov, V.; Iotova, A.

    1996-01-01

    The present hydro energy system in Bulgaria has been constructed mainly in the period 1950-1965. The currently utilized hydro-power potential, only 33% of the estimated technical potential, includes 87 HPP operating in 1991. A complex assessment of the environmental impact of the hydro energy objects as well as a comparative analysis of all energy sources in Bulgaria is made in the framework of Bulgarian Case Study of the DECADES Inter-Agency Project. The main types of environmental impact related to HPP operation are presented in 7 specific categories: land requirements, changes in the landscape, hydrological changes, micro-climatic changes, geodynamic changes, risk from man-made activities; generation of new ecosystems. A technique of expertise in ball is proposed as a suitable quantitative approach for more precise assessment of impact on climate factors from different energy sources. 2 tabs., 5 refs

  1. Ontario Hydro at the millennium : has monopoly's moment passed?

    International Nuclear Information System (INIS)

    Daniels, R.J.

    1996-01-01

    This volume is a collection of 10 papers presented at a conference in which the challenges of restructuring the electric power industry in Ontario were discussed. Legal experts, policy makers, economists and stakeholders in the industry presented their views regarding the future of the industry in Ontario. The implications of privatization were discussed. There was general agreement on the need for some industry de-integration and privatization. However, agreement on the exact nature of the approach to take was more divided. For example, opinion was divided on what the logical endpoint of industry restructuring should be i.e. wholesale or retail competition. Also contentious was the question of what portion of Hydro's generating assets should be sold off to private enterprise if Hydro's generation and transmission assets are unbundled. Opinions were also divided about the environmental consequences of nuclear energy. Significant differences of opinion were evident concerning the privatization of Ontario Hydro's nuclear assets. refs., tabs., figs

  2. PCB management at Manitoba Hydro's Waverley Service Centre

    International Nuclear Information System (INIS)

    Rempel, R.G.; Engstrom, T.

    1996-01-01

    Manitoba Hydro was the first Canadian utility to initiate a program to decontaminate insulating oil contaminated with polychlorinated biphenyls (PCBs). This paper describes Manitoba Hydro's recovery, reuse and recycling program, operated out of the utility's Waverley Service Centre (WSC). The WSC is a central facility serving to phase out and and destroy PCBs which remain in Manitoba Hydro's electrical system. Several hundred thousand litres of PCB-contaminated insulating oil are decontaminated annually at the WSC. The decontaminated oil is then reconditioned for reuse within the system operations. A PCBX unit was purchased from Sun Ohio for the decontamination of insulating oils containing PCBs. PCB decontamination is achieved through a chemical dechlorination treatment process. The PCBX treatment unit and the PCB storage building were described. 18 refs., 8 figs

  3. Ontario Hydro's transportation of radioactive material and emergency response plan

    International Nuclear Information System (INIS)

    Karmali, N.

    1993-01-01

    Ontario Hydro has been transporting radioactive material for almost 30 years without any exposure to the public or release to the environment. However, there have been three accidents involving Hydro's shipments of radioactive material. In addition to the quality packaging and shipping program, Ontario Hydro has an Emergency Response Plan and capability to deal with an accident involving a shipment of radioactive material. The Corporation's ability to respond, to effectively control and contain the situation, site remediation, and to provide emergency public information in the event of a road accident minimizes the risk to the public and the environment. This emphasizes their commitment to worker safety, public safety and impact to the environment. Response capability is mandated under various legislation and regulations in Canada

  4. HydroSHEDS: A global comprehensive hydrographic dataset

    Science.gov (United States)

    Wickel, B. A.; Lehner, B.; Sindorf, N.

    2007-12-01

    The Hydrological data and maps based on SHuttle Elevation Derivatives at multiple Scales (HydroSHEDS) is an innovative product that, for the first time, provides hydrographic information in a consistent and comprehensive format for regional and global-scale applications. HydroSHEDS offers a suite of geo-referenced data sets, including stream networks, watershed boundaries, drainage directions, and ancillary data layers such as flow accumulations, distances, and river topology information. The goal of developing HydroSHEDS was to generate key data layers to support regional and global watershed analyses, hydrological modeling, and freshwater conservation planning at a quality, resolution and extent that had previously been unachievable. Available resolutions range from 3 arc-second (approx. 90 meters at the equator) to 5 minute (approx. 10 km at the equator) with seamless near-global extent. HydroSHEDS is derived from elevation data of the Shuttle Radar Topography Mission (SRTM) at 3 arc-second resolution. The original SRTM data have been hydrologically conditioned using a sequence of automated procedures. Existing methods of data improvement and newly developed algorithms have been applied, including void filling, filtering, stream burning, and upscaling techniques. Manual corrections were made where necessary. Preliminary quality assessments indicate that the accuracy of HydroSHEDS significantly exceeds that of existing global watershed and river maps. HydroSHEDS was developed by the Conservation Science Program of the World Wildlife Fund (WWF) in partnership with the U.S. Geological Survey (USGS), the International Centre for Tropical Agriculture (CIAT), The Nature Conservancy (TNC), and the Center for Environmental Systems Research (CESR) of the University of Kassel, Germany.

  5. 75 FR 18191 - City of Raleigh; Community Hydro, LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2010-04-09

    ...: Mr. Thomas A. McCormick, Raleigh City Attorney, P.O. Box 590, Raleigh, North Carolina 27601, e-mail tom.mccormick@ci.raleigh.nc.us . For Community Hydro, LLC: Lori Barg, Community Hydro, LLC, 113...

  6. 76 FR 8728 - Bear Creek Hydro Associates, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-02-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13951-000] Bear Creek Hydro..., Motions To Intervene, and Competing Applications On December 22, 2010, the Bear Creek Hydro Associates... (FPA), proposing to study the [[Page 8729

  7. Energy sources and power plants

    International Nuclear Information System (INIS)

    Schulz, Detlef; Schulz, Karen

    2013-01-01

    Energy is obtained from various energy sources (coal, petroleum, natural gas, nuclear fuels, wind energy, solar energy, hydro power, biomass, geothermal energy). These differ in each case with respect to their availability, methods of their production and the required power plant technologies. As technologies of the future fuel cells and nuclear fusion are traded. [de

  8. The HydroServer Platform for Sharing Hydrologic Data

    Science.gov (United States)

    Tarboton, D. G.; Horsburgh, J. S.; Schreuders, K.; Maidment, D. R.; Zaslavsky, I.; Valentine, D. W.

    2010-12-01

    The CUAHSI Hydrologic Information System (HIS) is an internet based system that supports sharing of hydrologic data. HIS consists of databases connected using the Internet through Web services, as well as software for data discovery, access, and publication. The HIS system architecture is comprised of servers for publishing and sharing data, a centralized catalog to support cross server data discovery and a desktop client to access and analyze data. This paper focuses on HydroServer, the component developed for sharing and publishing space-time hydrologic datasets. A HydroServer is a computer server that contains a collection of databases, web services, tools, and software applications that allow data producers to store, publish, and manage the data from an experimental watershed or project site. HydroServer is designed to permit publication of data as part of a distributed national/international system, while still locally managing access to the data. We describe the HydroServer architecture and software stack, including tools for managing and publishing time series data for fixed point monitoring sites as well as spatially distributed, GIS datasets that describe a particular study area, watershed, or region. HydroServer adopts a standards based approach to data publication, relying on accepted and emerging standards for data storage and transfer. CUAHSI developed HydroServer code is free with community code development managed through the codeplex open source code repository and development system. There is some reliance on widely used commercial software for general purpose and standard data publication capability. The sharing of data in a common format is one way to stimulate interdisciplinary research and collaboration. It is anticipated that the growing, distributed network of HydroServers will facilitate cross-site comparisons and large scale studies that synthesize information from diverse settings, making the network as a whole greater than the sum of its

  9. Hydro models and salmon recovery in the northwest

    International Nuclear Information System (INIS)

    Dragoon, K.

    1993-01-01

    Hydro regulation models provide extensive support for analyzing the efficacy of salmon recovery plans in the Northwest. Power planners developed these computer programs to help plan and efficiently operate a large multiple use river system. The models represent physical relationships and operational requirements on the system. They also simulate coordinated system operations for efficient power generation. These models are being pressed into service to provide data for fish recovery plans. They provide important information about hydro system capabilities and responses to recovery programs. However, the models cannot meet all of the analytical needs of fish biologists working toward salmon recovery

  10. A Full Hydro- and Morphodynamic Description of Breaker Bar Development

    DEFF Research Database (Denmark)

    Jacobsen, Niels Gjøl

    The present thesis considers a coupled modelling approach for hydro- and morphodynamics in the surf zone, which is based on a solution to the Reynolds Averaged Navier-Stokes (RANS) equations with a Volume of Fluid (VOF) closure for the surf tracking. The basis for the numerical approach is the su......The present thesis considers a coupled modelling approach for hydro- and morphodynamics in the surf zone, which is based on a solution to the Reynolds Averaged Navier-Stokes (RANS) equations with a Volume of Fluid (VOF) closure for the surf tracking. The basis for the numerical approach...

  11. Report on the renewal of the hydro-electric concessions

    International Nuclear Information System (INIS)

    2006-11-01

    The administrative procedures of the renewable of the hydro-electric concessions in France is a real problem, leading to too long time of the case files examination. This mission aimed to identify the technical and financial criteria on which the decision maker will base his choice to give the concessions renewal. This report exposes the evaluation and the recommendations of the mission. The first part establishes an evaluation of the situation of the hydro-electric concessions and the today renewal procedures. The second part presents a analysis of this situation and the recommendations. The last part brings the conclusions. (A.L.B.)

  12. Towards A Grid Infrastructure For Hydro-Meteorological Research

    Directory of Open Access Journals (Sweden)

    Michael Schiffers

    2011-01-01

    Full Text Available The Distributed Research Infrastructure for Hydro-Meteorological Study (DRIHMS is a coordinatedaction co-funded by the European Commission. DRIHMS analyzes the main issuesthat arise when designing and setting up a pan-European Grid-based e-Infrastructure for researchactivities in the hydrologic and meteorological fields. The main outcome of the projectis represented first by a set of Grid usage patterns to support innovative hydro-meteorologicalresearch activities, and second by the implications that such patterns define for a dedicatedGrid infrastructure and the respective Grid architecture.

  13. Small hydro takes stock of a dozen years of activity

    International Nuclear Information System (INIS)

    Leutwiler, H.

    2000-01-01

    This short article discusses a survey that takes stock of the investments made in small hydro schemes in Switzerland since 1985 and the structural changes in this area that have occurred. Typical figures are given for investments and the increase in energy production that have resulted. The various possibilities for the realisation of small hydro installations are discussed including pressure-reduction turbines, the use of turbines in drinking water and wastewater systems. The importance of the sale of the electricity thus generated as 'green' power is noted. The potential of this form of electricity generation in a liberalised electricity market and the obstacles placed in its way are discuss

  14. Small hydroelectric power plants - shelf goods or tailor-made?

    International Nuclear Information System (INIS)

    Aas, Trond R.

    2002-01-01

    If small hydroelectric power plants are defined to be hydroelectric power plants of up to a few 1000 kW, they should be shelf goods because of cost considerations. Design of small hydroelectric power plants is a many-sided optimization task, on a level with constructing larger hydro power plants. But the budget for a small hydro power plant does not permit any comprehensive evaluations. The most important costs are the one-time costs in the form of investments and the following annual costs in the form of operation and maintenance, and losses. Financing costs are not considered in this article

  15. Mechatronics in compressor valves - experience with HydroCOM; Mechatronik in Kompressorventilen - Betriebserfahrungen mit HydroCOM

    Energy Technology Data Exchange (ETDEWEB)

    Rumpold, A. [Hoerbiger Ventilwerke GmbH, Wien (Austria)

    2000-03-01

    Optimisation of fluid flow rates is indispensable in piston compressor operation. Messrs. Hoerbiger are producers of continuous control elements which combine mechanical and electronic components. Applications and examples of the HydroCOM control system are presented. High availability permits servicing intervals around 160,000 hours of operation. The longer operating time will improve the competitive standing of piston compressors as compared to turbocompressors and screw compressors. [German] Fuer den Betrieb von Kolbenkompressoren ist eine optimale Liefermengenregelung unverzichtbarer Bestandteil. Im Gegensatz zu herkoemmlichen Verfahren hat Hoerbiger vor zwei Jahren durch die Kombination von Mechanik und Elektronik eine neue Generation von stufenlosen Mengenregelungen auf den Markt gebracht. Anwendungsbeispiele und Betriebserfahrungen mit der HydroCOM Regelung werden vorgestellt. Hohe Verfuegbarkeit erlaubt Wartungsintervalle fuer HydroCOM Aktuatoren von ca. 16000 Betriebsstunden. Und aufgrund der generell verbesserten Standzeiten von Packungen, Kolbenringen und Ventilen erzielt der so geregelte Kolbenkompressor hohe Attraktivitaet gegenueber Turbo- und Schraubenverdichtern. (orig./AKF)

  16. HydroPak: concept design and analysis of a packaged cross-flow turbine

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed.

  17. HydroPak: concept design and analysis of a packaged cross-flow turbine

    International Nuclear Information System (INIS)

    2004-01-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed

  18. Municipal water powers small hydro in California

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, C.W.

    1985-07-01

    The city council of San Luis Obispo, California approved a scheme in 1984 to install a hydropower plant into an existing water distribution network. The Stenner Canyon project is under construction on the site of an abandoned water treatment plant. A 750 kW Pelton turbine will be fed via a 20 km pipeline from the Salimas Reservoir. A remote telemetry system will control turbine output. The primary objectives are to generate extra power for the area and provide additional revenue for the city. Computer simulation helped hydraulics engineers design the system. Tax-exempt industrial development bonds will finance the $1.5 million project. 2 figures.

  19. 75 FR 65312 - Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2010-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13831-000] Vortex Hydro... Comments and Interventions October 15, 2010. On August 9, 2010, Vortex Hydro Energy, LLC filed an... 0.788 gigawatt-hours. Applicant Contact: Gus Simiao, CEO, Vortex Hydro Energy, LLC, 2512 Carpenter...

  20. 76 FR 76155 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-12-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... Diego Gas & Electric Company transmission line located to the south. Applicant Contact: Arnold B...

  1. 77 FR 21765 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-04-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... California Edison located north of the proposed project and to an existing San Diego Gas & Electric Company...

  2. The 12th 735-kV transmission line project: Hydro-Quebec network

    International Nuclear Information System (INIS)

    1992-01-01

    Hydro-Quebec is proposing to construct a 735-kV transmission line from the Chissibi station near the LG3 hydroelectric power plant to the Jacques-Cartier station near Quebec City. The width of the right-of-way will generally be 90 m and it is intended to install the line in two stages. The Chissibi-Chibougamau section should enter service in 1993 and the Chibougamau-Cartier section in 1994. The cost of the line is estimated at $1.21 billion, of which $900 million is for line construction and $310 million for station equipment. Prospective corridors for the line route have been selected, portions of which enable twinning with Hydro-Quebec's existing 9th 735-kV line. A series of hearings on the environmental and other impacts of the power line project was held by the Bureau d'audiences publiques sur l'environnement and results are summarized along with the views of the Bureau. The summary describes the justification for the project, the choice of the transmission line route, the evaluation of the impacts of the project on the natural and human environments, health effects due to magnetic fields, and effects on the economic development of northern Quebec. Recommendations are given for mitigating the impacts of the project. 13 refs., 8 figs., 2 tabs

  3. The Ontario Hydro approach to assuring quality in nuclear heat exchanger tubing

    International Nuclear Information System (INIS)

    Maka, E.P.

    1982-01-01

    Ontario Hydro utilizes the CANDU PHWR reactor system. The heat transport system circulates pressurized heavy water through the reactor fuel channels to remove heat produced by the fission of uranium fuel. Heavy water is used for the heat transport medium because it is the most efficient liquid from the standpoint of neutron economy. The heat is carried by the reactor coolant to the steam generators where it is transferred to the light water side to form steam which drives the turbine generators. Many heat exchangers are incorporated in the heat transfer cycle. Their integrity is of prime importance both for the reliability of the power plant and for economic reasons since the loss of heavy water at $300/kg is a substantial penalty. This integrity depends largely on the quality of the heat exchanger tubing and where major heat exchangers are involved, it has been the Ontario Hydro policy to supply tubing to heat exchanger manufacturers on a ''free issue'' basis. This allows better control over the level of inspection perform

  4. Hydro-abrasive erosion of hydraulic turbines caused by sediment - a century of research and development

    Science.gov (United States)

    Felix, D.; Albayrak, I.; Abgottspon, A.; Boes, R. M.

    2016-11-01

    Hydro-abrasive erosion of hydraulic turbines is an economically important issue due to maintenance costs and production losses, in particular at high- and medium-head run-of- river hydropower plants (HPPs) on sediment laden rivers. In this paper, research and development in this field over the last century are reviewed. Facilities for sediment exclusion, typically sand traps, as well as turbine design and materials have been improved considerably. Since the 1980s, hard-coatings have been applied on Francis and Pelton turbine parts of erosion-prone HPPs and became state-of-the-art. These measures have led to increased times between overhauls and smaller efficiency reductions. Analytical, laboratory and field investigations have contributed to a better processes understanding and quantification of sediment-related effects on turbines. More recently, progress has been made in numerical modelling of turbine erosion. To calibrate, validate and further develop prediction models, more measurements from both physical model tests in laboratories and real-scale data from HPPs are required. Significant improvements to mitigate hydro-abrasive erosion have been achieved so far and development is ongoing. A good collaboration between turbine manufacturers, HPP operators, measuring equipment suppliers, engineering consultants, and research institutes is required. This contributes to the energy- and cost-efficient use of the worldwide hydropower potential.

  5. Effects of Scandinavian hydro power on storage needs in a fully renewable European power system for various transmission capacity scenarios

    Science.gov (United States)

    Kies, Alexander; Nag, Kabitri; von Bremen, Lueder; Lorenz, Elke; Heinemann, Detlev

    2015-04-01

    The penetration of renewable energies in the European power system has increased in the last decades (23.5% share of renewables in the gross electricity consumption of the EU-28 in 2012) and is expected to increase further up to very high shares close to 100%. Planning and organizing this European energy transition towards sustainable power sources will be one of the major challenges of the 21st century. It is very likely that in a fully renewable European power system wind and photovoltaics (pv) will contribute the largest shares to the generation mix followed by hydro power. However, feed-in from wind and pv is due to the weather dependant nature of their resources fluctuating and non-controllable. To match generation and consumption several solutions and their combinations were proposed like very high backup-capacities of conventional power generation (e.g. fossile or nuclear), storages or the extension of the transmission grid. Apart from those options hydro power can be used to counterbalance fluctuating wind and pv generation to some extent. In this work we investigate the effects of hydro power from Norway and Sweden on residual storage needs in Europe depending on the overlaying grid scenario. High temporally and spatially resolved weather data with a spatial resolution of 7 x 7 km and a temporal resolution of 1 hour was used to model the feed-in from wind and pv for 34 investigated European countries for the years 2003-2012. Inflow into hydro storages and generation by run-of-river power plants were computed from ERA-Interim reanalysis runoff data at a spatial resolution of 0.75° x 0.75° and a daily temporal resolution. Power flows in a simplified transmission grid connecting the 34 European countries were modelled minimizing dissipation using a DC-flow approximation. Previous work has shown that hydro power, namely in Norway and Sweden, can reduce storage needs in a renewable European power system by a large extent. A 15% share of hydro power in Europe

  6. Ontario hydro's aqueous discharge monitoring program

    International Nuclear Information System (INIS)

    Mehdi, S.H.; Booth, M.R.; Massey, R.; Herrmann, O.

    1992-01-01

    The Province of Ontario has legislated a comprehensive monitoring program for waterborne trace contaminants called MISA - Municipal Industrial Strategy for Abatement. The electric power sector regulation applies to all generating stations (Thermal, Nuclear, Hydraulic). The program commenced in June, 1990. The current phase of the regulation requires the operators of the plants to measure the detailed composition of the direct discharges to water for a one year period. Samples are to be taken from about 350 identified streams at frequencies varying from continuous and daily to quarterly. The data from this program will be used to determine the scope of the ongoing monitoring program and control. This paper discusses the preparation and planning, commissioning, training and early operations phase of the MISA program. In response, the central Analytical Laboratory and Environmental staff worked to develop a sampling and analytical approach which uses the plant laboratories, the central analytical laboratory and a variety of external laboratories. The approach considered analytical frequency, sample stability, presence of radioactivity, suitability of staff, laboratory qualifications, need for long term internal capabilities, availability of equipment, difficulty of analysis, relationship to other work and problems, capital and operating costs. The complexity of the sampling program required the development of a computer based schedule to ensure that all required samples were taken as required with phase shifts between major sampling events at different plants to prevent swamping the capability of the central or external laboratories. New equipment has been purchased and installed at each plant to collect 24 hour composite samples. Analytical equipment has been purchased for each plant for analysis of perishable analytes or of samples requiring daily or thrice weekly analysis. Training programs and surveys have been implemented to assure production of valid data

  7. Some hydrogen-control considerations for ice-condenser nuclear plants

    International Nuclear Information System (INIS)

    Hubbard, H.W.; Hammond, R.P.; Zivi, S.M.

    1981-02-01

    The proposal of the Tennessee Valley Authority (TVA) for coping with the problem of accident generated hydrogen gas in its Sequoyah ice-condenser plant was to put in place glow-plug igniters so that any hydrogen that is evolved during an accident could be burnt before accumulating into a dangerously large mass. Since it was desired to install these igniters in the Sequoyah and other plants as quickly as possible, the NRC asked the Lawrence Livermore National Laboratory (LLNL) to carry out some experiments on these igniters to delineate the region of their applicability

  8. Hydro-MRI for abdominal diagnostics in children; Hydro-MRT in der Darmdiagnostik bei Kindern

    Energy Technology Data Exchange (ETDEWEB)

    Kern, A.; Schunk, K.; Oberholzer, K.; Thelen, M. [Mainz Univ. (Germany). Klinik und Poliklinik fuer Radiologie; Kessler, M. [Mainz Univ. (Germany). Klinik und Poliklinik fuer Kinderchirurgie

    2001-11-01

    A clinical evaluation of hydro-MRI as an alternative method to barium studies in children with abdominal pain of unknown origin is presented. Patients and Methods: 20 children with abdominal pain of unknown origin aged from 9 - 16 years were examined after oral bowel opacification using 1000 ml of 2.5% mannitol solution with a 1.0T MRI system. The investigation was done in 2 planes (coronal and axial) under breath-hold conditions. Imaging procedures included various sequences (T2W HASTE + FS, contrast-enhanced T1W FLASH FS). Suspicious findings in bowel segments and extra-intestinal changes were assessed. Results: In 21/24 examinations the small bowel was completely visualized, in 15/24 cases colon segments were identified. An accurate assessment of the terminal ileum was not possible in 3/24 procedures. Breathing artefacts occurred in 3/24 examinations. Signs of Crohn's disease were found in 4 examinations, inflammatory changes of the ileum were detected in 3 cases. Inflammation of the colon was demonstrated in 2 children. Furthermore, pathological findings included constipation in one child and inflammation of the ileo-colic and mesenterial lymph nodes were found in another child. Extra-intestinal changes in 3 children were caused by ovarian cysts, and in one case by pleural effusion. In 4 examinations we detected ascites in the absence of other pathological findings. In 5 children there was no pathological correlation in the bowel or extra-intestinal region for the complaints. The children tolerated the hydro-MRI very well. There were no side effects using oral mannitol. (orig.) [German] Ziel: Klinische Evaluation der Hydro-MRT bei Kindern mit unklarer abdomineller Symptomatik als alternative Methode zur fraktionierten Magen-Darm-Passage. Patienten und Methoden: 20 Kinder und Jugendliche im Alter von 9 bis 16 Jahren mit unklaren abdominellen Beschwerden bzw. mit Verdacht auf eine chronisch entzuendliche Darmerkrankung wurden nach einer oralen

  9. Hydropower plants as provider of TSO purchased services using the example of E.ON Wasserkraft GmbH; Wasserkraft als Netzdienstleister am Beispiel der E.ON Wasserkraft GmbH

    Energy Technology Data Exchange (ETDEWEB)

    Brucker, Michael [E.ON Wasserkraft GmbH, Landshut (Germany)

    2012-07-01

    Hydro power plants provide comprehensive TSO purchased services for the 50-Hz-grid as well as for the 16.7-Hz-grid of Deutsche Bahn (German Railway). Within the E.ON generation portfolio in Germany hydro power plants achieve the lion's share of revenues in TSO purchased services (primary control, secondary control, minute reserve). Although the possibility to build new hydro generation capacities is limited in Germany by nature, it is possible to increase the offer for TSO purchased services. This paper explains the different aspects of TSO purchases services provided by hydro power plants. (orig.)

  10. BC Hydro's transmission business : transition to a competitive marketplace

    International Nuclear Information System (INIS)

    Threlkeld, R.J.

    1998-01-01

    Progress made by BC Hydro to facilitate the use of the transmission system for wholesale electricity transactions, including the separation of the system operation function from generation and merchant functions, was discussed. BC Hydro, Canada's third largest electric utility, was the first Canadian utility to offer open access to its transmission system for wholesale transactions. The utility has an installed generating capacity of about 10.8 gigawatts, 90 per cent of which is hydroelectric. The remainder is thermal, gas turbine and stationary and mobile diesel generation. The key element in establishing wholesale transmission transactions was the FERC-mandated open access same-time information system (OASIS) on which BC Hydro posts available transmission capacity, planned outages and pricing. The system operates on BC Hydro's internet node and interfaces to a Transmission Scheduling System (TSS). The TSS was developed in-house to handle the increased complexity of scheduling multiple energy and capacity transactions for users of the transmission system. Operation of the system and the challenge to constantly improve it were discussed

  11. Asymptotic study of a magneto-hydro-dynamic system

    International Nuclear Information System (INIS)

    Benameur, J.; Ibrahim, S.; Majdoub, M.

    2003-01-01

    In this paper, we study the convergence of solutions of a Magneto-Hydro-Dynamic system. On the torus T 3 , the proof is based on Schochet's methods, whereas in the case of the whole space R 3 , we use Strichartz's type estimates. (author)

  12. Experimental condition in the preparation of catalysts for Hydro treatment

    International Nuclear Information System (INIS)

    Gomez P, Alvaro

    1998-01-01

    In this work, by means of an exhaustive bibliographical revision and in a methodical way, they seek to settle down, the characteristics of the catalysts for Hydro treatment (HDT) on those that it is necessary to act with the purpose of obtaining more active, selective and resistant catalysts to the deactivation

  13. The Statoil/Hydro fusion in a continental shelf perspective

    International Nuclear Information System (INIS)

    Osmundsen, Petter

    2007-01-01

    The article analysis the consequences of the Statoil/Hydro merger on the development on the Norwegian continental shelf. Various indicators of results of the market power the merger are presented and the effects of reduced competition on the markets are discussed. The advantages of the merger on the activities on the shelf are analyzed. (tk)

  14. Fuzzy interpolation of hydro power sales data in Simulink

    DEFF Research Database (Denmark)

    Jantzen, Jan; Eliasson, B.

    1994-01-01

    The problem in this case study can be described as a multi-dimensional surface fit to a given set of data. The data are sales figures in MWH/H for a hydro-thermal power generation system. The data are incomplete and not totally reliable. A model with ten fuzzy rules fits the data with a total error...

  15. Hydrological Modeling in Alaska with WRF-Hydro

    Science.gov (United States)

    Elmer, N. J.; Zavodsky, B.; Molthan, A.

    2017-12-01

    The operational National Water Model (NWM), implemented in August 2016, is an instantiation of the Weather Research and Forecasting hydrological extension package (WRF-Hydro). Currently, the NWM only covers the contiguous United States, but will be expanded to include an Alaska domain in the future. It is well known that Alaska presents several hydrological modeling challenges, including unique arctic/sub-arctic hydrological processes not observed elsewhere in the United States and a severe lack of in-situ observations for model initialization. This project sets up an experimental version of WRF-Hydro in Alaska mimicking the NWM to gauge the ability of WRF-Hydro to represent hydrological processes in Alaska and identify model calibration challenges. Recent and upcoming launches of hydrology-focused NASA satellite missions such as the Soil Moisture Active Passive (SMAP) and Surface Water Ocean Topography (SWOT) expand the spatial and temporal coverage of observations in Alaska, so this study also lays the groundwork for assimilating these NASA datasets into WRF-Hydro in the future.

  16. Hydro-Quebec International : taking up the challenges of globalization

    International Nuclear Information System (INIS)

    Carpentier, J.M.

    1997-01-01

    With the ever increasing demand for electricity, it is estimated that the world''s electrical generating capacity will grow by about 1,000,000 MW over the next eight years. This represents a 40 per cent increase over today''s capacity. Hydro-Quebec is determined to stake its place in international markets and to maximize the profits from the strong expertise gained during the construction of Quebec''s major electric facilities. The venture into international markets is primarily a commercial strategy. To that effect, Hydro-Quebec plans to invest up to $300 million in international projects around the world so that after five years it can have major interests and assets totaling $12 billion or more. China, North Africa and the Middle East are some of the market that Hydro-Quebec wishes to enter in the years ahead. The Eastern European and Southeast Asian markets are also worthy of interest. It was pointed out that Hydro-Quebec is not the only large electric utility turning to world market to pursue its growth. French, Spanish and American companies are also presently investing billions of dollars in the world market

  17. The radiation safety self-assessment program of Ontario Hydro

    International Nuclear Information System (INIS)

    Armitage, G.; Chase, W.J.

    1987-01-01

    Ontario Hydro has developed a self-assessment program to ensure that high quality in its radiation safety program is maintained. The self-assessment program has three major components: routine ongoing assessment, accident/incident investigation, and detailed assessments of particular radiation safety subsystems or of the total radiation safety program. The operation of each of these components is described

  18. Hydro-Quebec International : taking up the challenges of globalization

    Energy Technology Data Exchange (ETDEWEB)

    Carpentier, J.M.

    1997-12-31

    With the ever increasing demand for electricity, it is estimated that the world`s electrical generating capacity will grow by about 1,000,000 MW over the next eight years. This represents a 40 per cent increase over today`s capacity. Hydro-Quebec is determined to stake its place in international markets and to maximize the profits from the strong expertise gained during the construction of Quebec`s major electric facilities. The venture into international markets is primarily a commercial strategy. To that effect, Hydro-Quebec plans to invest up to $300 million in international projects around the world so that after five years it can have major interests and assets totaling $12 billion or more. China, North Africa and the Middle East are some of the market that Hydro-Quebec wishes to enter in the years ahead. The Eastern European and Southeast Asian markets are also worthy of interest. It was pointed out that Hydro-Quebec is not the only large electric utility turning to world market to pursue its growth. French, Spanish and American companies are also presently investing billions of dollars in the world market.

  19. Hydro-Quebec's Strategic Plan 2002-2006 : summary

    International Nuclear Information System (INIS)

    2001-01-01

    A corporate profile of Hydro-Quebec was presented and the strategy that the utility will adopt for the 2002-2006 period was summarized. The utility plans to maintain its service quality and sustain environmental quality while developing a world class enterprise. Quebec has adopted a heritage pool giving Quebec consumers access to a maximum of 165 TWh of electricity per year at an average commodity rate of 2.79 cents per kilowatt-hour, the lowest rate for such a large amount of energy in North America. Above that volume, supply for the Quebec market will be ensured through competitive bidding, leading to the signing of supply contracts based on market price. Hydro-Quebec's strategy reflects the business opportunities open to Hydro-Quebec given its traditional activities in the province, the restructuring of North American energy markets, and the emergence of Quebec as a major energy hub. The business opportunities come from the fact that demand for electricity in Quebec is growing and from the opening of markets close to Quebec. Investment outlook in hydroelectric generation and transmission also appears to be profitable. It is likely that investment will be needed to build infrastructure. Hydro-Quebec is also working with its qualified workforce to develop a world-class international activity base. tabs., figs

  20. Hydro-carbon liquid for use in motors

    Energy Technology Data Exchange (ETDEWEB)

    Cobbett, G T.B.

    1907-03-15

    A process for the manufacture of liquid hydro-carbon mixtures suitable as a fuel for internal-combustion engines is disclosed, which consists in dissolving a suitable quantity of shale oil, which has been purified with sulfuric acid, in petroleum spirit, then purifying the solution with sulfuric acid and subsequently with oxalic acid or other suitable decolorizing agent.