  1. Some problems raised by the operation of large nuclear turbo-generator sets. Automatic control system for steam turbo-generator units

    International Nuclear Information System (INIS)

    Cecconi, F.

    1976-01-01

    The design of an appropriate automatic system was found to be useful to improve the control of large size turbo-generator units so as to provide easy and efficient control and monitoring. The experience of the manufacturer of these turbo-generator units allowed a system well suited for this function to be designed [fr

  2. Automotive turbogenerator design options

    Energy Technology Data Exchange (ETDEWEB)

    Rodgers, C. [ITC, San Diego, CA (United States); McDonald, C. [McDonald Thermal Engineering, La Jolla, CA (United States)

    1998-12-31

    For the small turbogenerator to find reception in the hybrid electric automotive market its major features must be dominated by the following considerations, low cost, high performance, low emissions, compact size and high reliability. Not meeting the first two criteria has been the nemesis of earlier attempts to introduce the small gas turbine for automotive service. With emphasis on the design for low cost and high performance, this paper presents several turbogenerator design flowpath configuration options for the major engine components. The projected evolution from today`s state-of-the-art all metallic engines, to advanced technology ceramic units for service in the early decade of the 21st century, is the major topic of this paper. (author)

  3. Computerized optimum distribution of loads among the turbogenerators of fossil-fuel electric power plants

    Energy Technology Data Exchange (ETDEWEB)

    Foshko, L S; Zusmanovich, L B; Flos, S L; Pal' chik, V A; Konevskii, B I

    1979-04-01

    The problem of determining the optimum distribution of loads among turbogenerators in a fossil-fuel power plant is considered based on satisfying the following requirements: distribution of electrical and thermal loads to minimize the heat expended on the turbine unit; calculation based on turbogenerator characteristics that most completely describe operating conditions; no constraints on the configuration of turbogenerator performance characteristics; calculation of load distribution based on net characteristics including the internal needs of the turbogenerators; consideration of all operational limitations in turbogenerator working conditions; results should be applicable to any predetermined differential of the load change. A flowchart is given showing the organization of the Optim-76 program complex for solution of this problem. An example is given showing application of the Optim-76 program implemented by a Minsk-32 computer in the case of a heat and electric power station with three turbogenerators. The results show that a dynamic programming method has considerable advantages for this applicaton on third-generation computers.

  4. SMALL TURBOGENERATOR TECHNOLOGY FOR DISTRIBUTED GENERATION

    Energy Technology Data Exchange (ETDEWEB)

    Ali, Sy; Moritz, Bob

    2001-09-01

    This report is produced in under Contract DE-FC26-00NT40914, awarded in accordance with U.S. Department of Energy solicitation DE-PS26-00FT40759, ''Development of Technologies and Capabilities for Fossil Energy-Wide Coal, Natural Gas and Oil R&D Programs'', area of interest 7, ''Advanced Turbines and Engines.'' As a result of ten years of collaborative fuel cell systems studies with U.S. fuel cell manufacturers, initiated to evaluate the gas turbine opportunities likely to result from this technology, Rolls-Royce in Indianapolis has established a clear need for the creation of a turbogenerator to a specification that cannot be met by available units. Many of the required qualities are approached, but not fully met, by microturbines, which tend to be too small and low in pressure ratio. Market evaluation suggests a 1 MW fuel cell hybrid, incorporating a turbogenerator of about 250 kW, is a good market entry product (large enough to spread the costs of a relatively complex plant, but small enough to be acceptable to early adopters). The fuel cell stack occupies the position of a combustor in the turbogenerator, but delivers relatively low turbine entry temperature (1600 F [870 C]). If fitted with a conventional combustor and run stand-alone at full uncooled turbine temperature (1800 F [980 C]), the turbogenerator will develop more power. The power can be further enhanced if the turbogenerator is designed to have flow margin in its fuel cell role (by running faster). This margin can be realized by running at full speed and it is found that power can be increased to the 0.7 to 1.0 MW range, depending on initial fuel cell stack flow demand. The fuel cell hybrid applications require increased pressure ratio (at least 6 rather than the 3-4 of microturbines) and very long life for a small machine. The outcome is a turbogenerator that is very attractive for stand-alone operation and has been the subject of unsolicited enthusiasm from

  5. Turbo-generator control with variable valve actuation

    Science.gov (United States)

    Vuk, Carl T [Denver, IA

    2011-02-22

    An internal combustion engine incorporating a turbo-generator and one or more variably activated exhaust valves. The exhaust valves are adapted to variably release exhaust gases from a combustion cylinder during a combustion cycle to an exhaust system. The turbo-generator is adapted to receive exhaust gases from the exhaust system and rotationally harness energy therefrom to produce electrical power. A controller is adapted to command the exhaust valve to variably open in response to a desired output for the turbo-generator.

  6. Development and tests of large nuclear turbo-generator welded rotors

    International Nuclear Information System (INIS)

    Colombie, H.; Thiery, M.; Rotzinger, R.; Pelissou, C.; Tabacco, C.; Fernagut, V.

    2015-01-01

    Turbo-generators require large forgings for the rotor and it is a worldwide practice to manufacture turbo-generator rotor bodies as single piece forgings. Rotors for nuclear applications (4-pole rotors design, 1500/1800 rpm) require forgings of up to 2.0 m diameter and ultra large ingots with weight more than 500 tons. Nowadays only few forge masters can deliver such forgings in the world. Based on the large welding experience Alstom has gained over decades on steam and gas turbines and Alstom's multi piece shrunk turbo-generator rotors, it was suggested to manufacture 4-pole turbo-generator rotors by welding the shaft from aligned cylindrical forgings. Compared to turbine welded rotors, the shaft of a turbo-generator rotor presents differences linked to dimensions/weight, weld depth and electrical application. The manufacture of a 2 disc model allowed to prove through electrical and mechanical analysis the reliability of the concept as well as the reliability of the manufacturing processes through material tests, micro sections, electrical component tests, weld geometry, welding processes (TIG,SAW,...), weld inspection (Ultrasonic testing, radiographic inspection,...) weld heat treatments and machining. Then a full rotor able to replace a single forging rotor was manufactured in order to validate and prove to potential customers the validity of the welded rotor technology. During the first order from EDF of a welded 900 MW spare rotor, the procedure for the Non Destructive Test on a slotted rotor was developed upon EDF request in order to compare future Non Destructive Testing with the finger print of the new rotor. This complete rotor was delivered to EDF in January 2013. This rotor is in operation in a nuclear unit since November 2013. (authors)

  7. Altheim geothermal plant. Power generation by means of an ORC turbogenerator; Geothermieanlagen Altheim. Stromerzeugung mittels Organic-Rankine-Cycle Turbogenerator

    Energy Technology Data Exchange (ETDEWEB)

    Pernecker, G [Marktgemeindeamt Altheim (Austria)

    1997-12-01

    The report describes the project of the Austrian market town of Altheim to generate electricity by means of an ORC turbogenerator using low-temperature thermal water. The project is to improve the technical and economic situation of the existing industrial-scale geothermal project. (orig.) [Deutsch] Der Bericht beschreibt das Vorhaben der Marktgemeinde Altheim in Oberoesterreich, Strom mittels eines Organic-Rankine-Cycle-Turbogenerators unter Verwendung niedrig temperierten Thermalwassers zu produzieren. Ziel bzw. der Zweck des Projektes ist es, die technische und wirtschaftliche Situation der bestehenden Grossthermieanlage zu verbessern. (orig.)

  8. An expert system for turbogenerator diagnostics

    International Nuclear Information System (INIS)

    Bessenyei, Z.; Tomcsanyi, T.; Toth, Z.; Laczay, I.

    1992-01-01

    In 1990, an expert system for turbo-generator diagnostics (EST-D) was installed at the 3rd and 4th units of the Paks NPP (Hungary). The expert system is strongly integrated to the ARGUS II vibration monitoring and diagnostics system. The system works on IBM PC AT. The VEIKI's and the NPP's human experts were interviewed to fill up the knowledgebase. The system is able to identify 13 different faults of the parts of a turbogenerator. The knowledgebase consists of ca 200 rules. The rules were built in and the system was verified and validated using a model of the turbines and using the experiences gathered with ARGUS II during the last 3 years. The maintenance personnel is authorized to modify and/or extend the knowledgebase. The input data for evaluation come from measured vibration patterns produced by the ARGUS II system, database of events, and maintenance data input by the maintenance personnel. The expert system is based on the modified GENESYS 2.1 shell (developed by SZAMALK, Hungary). Some limitations from PC application were eliminated, and a new, independent explanation module and man-machine interface were developed. Using this man-machine interface, one of the basic goals of the expert system developments was achieved: the human experts contribution is not necessary for diagnoses. The operator of the diagnostics system is able to produce the reports of diagnoses. Of course the interface allows the human experts to see the diagnoses through. It should be mentioned, at the beginning of 1991, we installed a similar expert system at the 1st 1000 MW WWER type unit of the Kalinin NPP (Soviet Union). In this paper, the operation of the EST-D, the man-machine interface and the operational experiences of the first 4 months work are explained. 2 refs., 14 figs

  9. Multiple electronic permanent turbogenerator for turbine engines of the 90th. Final report; MED-Turbogeneratoren fuer Stroemungskraftmaschinen der 90er Jahre. Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Reiner, G.

    1997-12-01

    Present state of research and technology: Usually generators are coupled over a reduction gear to high-speed gas turbines. Independent of the load requirements the number of revolutions of the gas turbine must remain constant and rigidly coupled to the frequency. In the partial load range the efficiency of the gas turbine sinks substantially. Reason/objective of the investigation: This project is supposed to prove the feasibility and the functionality of a turbogenerator (TG) in Multiple Electronic Permanent Magnet (MED) construction principle, which is directly coupled to the high-speed drive turbine. Further on the preconditions for the construction of prototypes in the size class 20 kW up to 100 kW as well as 100 kW to 1 MW should be created. Method: Preliminary investigation, dimensioning, calculation and construction of a 40 kW and a 400 kW (MED) turbogenerator. Production and commissioning of one operating model each. Production and/or procurement as well as construction of necessary testing facilities. Experimental proof of the target data. Results: 3 operating models including power electroncis and necessary periphery were manufactured, measured and tested at the test stand. The projected data: rated voltage and rated output power could be proven experimentally. Conclusion/application possibilities: The MED turbogenerator represents a compact construction principle (weight and volume advantages). Direct coupling on the shaft of the drive turbine is possible (high efficiency; reduction gear is void; noise minimisation). In connection with a static inverter a constant frequency independently of the number of revolutions of the drive turbine can be achieved. Althogether, compared with conventional technology, one can expect around 3-5% reduced fuel consumption. The TG can be applied both in stationary electrical power units and plants for decentralised cogeneration as well as mobilely for the electric drive of heavy trucks and buses. (orig.) [Deutsch

  10. A 220 MVA turbo-generator for the TCV tokamak power supplies

    International Nuclear Information System (INIS)

    Perez, A.; Canay, I.M.; Simond, J.-J.; Morf, J.-J; Pahud, J.-D; Seysen, R.

    1989-01-01

    A new 220 MVA, 120 Hz, 4 pole turbo-generator will be used as a pulsed power source to supply the toroidal and poloidal power supplies of the TCV tokamak, which is being built at the Ecole Polytechnique Federale de Lausanne in Switzerland. The paper describes the particular requirements of the TCV poloidal power supplies and the main electrical and mechanical features of the turbo-generator and its principal auxillaries. (author). 6 figs.; 1 tab

  11. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  12. Diagnostic system based on condition turbogenerator Petri nets

    International Nuclear Information System (INIS)

    Kachur, S.A.; Shakhova, N.V.

    2016-01-01

    A stochastic model of the automated monitoring systems and process control turbine generator based on Petri nets, allowing to detect local changes in the state of the stator windings of turbogenerator, is presented in the paper [ru

  13. Torsional vibration analysis in turbo-generator shaft due to mal-synchronization fault

    Science.gov (United States)

    Bangunde, Abhishek; Kumar, Tarun; Kumar, Rajeev; Jain, S. C.

    2018-03-01

    A rotor of turbo-generator shafting is many times subjected to torsional vibrations during its lifespan. The reasons behind these vibrations are three-Phase fault, two-phase fault, line to ground fault, faulty-mal synchronization etc. Sometimes these vibrations can cause complete failure of turbo-generator shafting system. To calculate moment variation during these faults on the shafting system vibration analysis is done using Finite Elements Methods to calculate mass and stiffness matrix. The electrical disturbance caused during Mal-synchronization is put on generator section, and corresponding second order equations are solved by using “Duhamel Integral”. From the moment variation plots at four sections critically loaded sections are identified.

  14. Research on Development of Turbo-generator with Partial Admission Nozzle for Supercritical CO{sub 2} Power Generation

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Junhyun; Shin, Hyung-ki; Lee, Gilbong; Baik, Young-Jin [Korea Institute of Energy Research (KIER), Daejeon (Korea, Republic of); Kang, Young-Seok [Korea Aerospace Research Institute (KARI), Daejeon (Korea, Republic of); Kim, Byunghui [InGineers Ltd., Seoul (Korea, Republic of)

    2017-04-15

    A Sub-kWe small-scale experimental test loop was manufactured to investigate characteristics of the supercritical carbon dioxide power cycle. A high-speed turbo-generator was also designed and manufactured. The designed rotational speed of this turbo-generator was 200,000 rpm. Because of the low expansion ratio through the turbine and low mass flowrate, the rotational speed of the turbo-generator was high. Therefore, it was difficult to select the rotating parts and design the turbine wheel, axial force balance and rotor dynamics in the lab-scale experimental test loop. Using only one channel of the nozzle, the partial admission method was adapted to reduce the rotational speed of the rotor. This was the world’s first approach to the supercritical carbon dioxide turbo-generator. A cold-run test using nitrogen gas under an atmospheric condition was conducted to observe the effect of the partial admission nozzle on the rotor dynamics. The vibration level of the rotor was obtained using a gap sensor, and the results showed that the effect of the partial admission nozzle on the rotor dynamics was allowable.

  15. Modelling of the turbo-generator groups dynamical behaviour. Application to the ARABELLE turbine of the N4 1400 MW unit

    International Nuclear Information System (INIS)

    Bediou, J.

    1993-01-01

    Simulation of the dynamical behaviour of the EDF turbogenerator groups is based on developments concerning bearing behaviour and shaft line dynamics. A provisional model for the ARABELLE turbine dynamic behaviour is derived. The detailed representation of all the components allows for a fine analysis of the different effects and the evaluation of the stresses transmitted to the structure in anomalistic operating conditions

  16. Some problems raised by the operation of large nuclear turbo-generator sets. Solutions proposed for the protection of large size generators

    International Nuclear Information System (INIS)

    Chaumienne, J.-P.

    1976-01-01

    The operating requirements of nuclear power stations call for relays with ever increasing performances. This urges the development of new electronic systems while giving high importance to their reliability. So as to provide for easy application and minitoring of the relays, even when the turbo-generator unit is operating, a new cubicle design is considered which offers maximum safety and flexibility in use [fr

  17. Integrated modeling of a turbo-generator: analysis, simulation and compensation; Modelado integrado de un turbogenerador: analisis, simulacion y compensacion

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez Rodriguez, Isaura Victoria

    2008-09-15

    Currently, most turbogenerator control systems consist of decentralized control schemes with independent control-loops for the turbine and the generator. These schemes do not take into account the interaction between the power and voltage control loops, which can degrade the turbogenerator response. To improve this situation, and to develop better control schemes, it is necessary to build full-scope mathematical models of the turbine generator set, which are able to emulate the dynamics throughout the operating range, including the interaction effects. In this thesis the mathematical model of a synchronous generator, which includes damping windings and rotor iron magnetic saturation, is developed. The model was modularly programmed using per-unit parameters. This model was coupled to the existing model of a gas turbine to compose the full-scope model of a 32 MVA combustion turbogenerator. The numerical stability of the generator and turbogenerator models demonstrated through steady-state simulation experiments. The dynamic behavior was demonstrated using power and voltage control loops based on digital PID algorithms. Then, the results of previous experiments were used to design a control scheme based on two fuzzy compensators: one for power and another for voltage. The proposed fuzzy scheme significantly reduced the unwanted interaction effects of decentralized conventional control schemes. It was demonstrated the proposed turbogenerator model is valid in a wide operating range and allows designing and evaluating high performance control schemes, which take into account the interaction between the turbine and the generator. Besides, the turbogenerator model is being used at the Electrical Research Institute to integrate a real-time bench test for turbogenerator control systems. [Spanish] Actualmente, la mayoria de los sistemas de control para turbogeneradores contemplan esquemas de control descentralizados con lazos de control independientes para la turbina y el

  18. On line instrument systems for monitoring steam turbogenerators

    Science.gov (United States)

    Clapis, A.; Giorgetti, G.; Lapini, G. L.; Benanti, A.; Frigeri, C.; Gadda, E.; Mantino, E.

    A computerized real time data acquisition and data processing for the diagnosis of malfunctioning of steam turbogenerator systems is described. Pressure, vibration and temperature measurements are continuously collected from standard or special sensors including startup or stop events. The architecture of the monitoring system is detailed. Examples of the graphics output are presented. It is shown that such a system allows accurate diagnosis and the possibility of creating a data bank to describe the dynamic characteristics of the machine park.

  19. Electromagnetic behaviour of the shield in turbogenerators with superconducting solenoids

    International Nuclear Information System (INIS)

    Del Vecchio, P.; Veca, G.M.; Sacerdoti, G.

    1975-11-01

    The structure of turbogenerators with superconducting solenoids is analyzed and the investigation of electromagnetic behaviour of the rotating shield is presented. The cases considered are: (a) An hypothetical operation with a single phase with nominal current; (b) Steady-state operation in inverse sequence with 10% of the nominal current; (c) A step variation of the magnetic field intensity in the shield

  20. Part-Load Performance of aWet Indirectly Fired Gas Turbine Integrated with an Organic Rankine Cycle Turbogenerator

    Directory of Open Access Journals (Sweden)

    Leonardo Pierobon

    2014-12-01

    Full Text Available Over the last years, much attention has been paid to the development of efficient and low-cost power systems for biomass-to-electricity conversion. This paper aims at investigating the design- and part-load performance of an innovative plant based on a wet indirectly fired gas turbine (WIFGT fueled by woodchips and an organic Rankine cycle (ORC turbogenerator. An exergy analysis is performed to identify the sources of inefficiencies, the optimal design variables, and the most suitable working fluid for the organic Rankine process. This step enables to parametrize the part-load model of the plant and to estimate its performance at different power outputs. The novel plant has a nominal power of 250 kW and a thermal efficiency of 43%. The major irreversibilities take place in the burner, recuperator, compressor and in the condenser. Toluene is the optimal working fluid for the organic Rankine engine. The part-load investigation indicates that the plant can operate at high efficiencies over a wide range of power outputs (50%–100%, with a peak thermal efficiency of 45% at around 80% load. While the ORC turbogenerator is responsible for the efficiency drop at low capacities, the off-design performance is governed by the efficiency characteristics of the compressor and turbine serving the gas turbine unit.

  1. Conceptual Design Study of a Closed Brayton Cycle Turbogenerator for Space Power Thermal-To-Electric Conversion System

    Science.gov (United States)

    Hansen, Jeff L.

    2000-01-01

    A conceptual design study was completed for a 360 kW Helium-Xenon closed Brayton cycle turbogenerator. The selected configuration is comprised of a single-shaft gas turbine engine coupled directly to a high-speed generator. The engine turbomachinery includes a 2.5:1 pressure ratio compression system with an inlet corrected flow of 0.44 kg/sec. The single centrifugal stage impeller discharges into a scroll via a vaned diffuser. The scroll routes the air into the cold side sector of the recuperator. The hot gas exits a nuclear reactor radiator at 1300 K and enters the turbine via a single-vaned scroll. The hot gases are expanded through the turbine and then diffused before entering the hot side sector of the recuperator. The single shaft design is supported by air bearings. The high efficiency shaft mounted permanent magnet generator produces an output of 370 kW at a speed of 60,000 rpm. The total weight of the turbogenerator is estimated to be only 123 kg (less than 5% of the total power plant) and has a volume of approximately 0.11 cubic meters. This turbogenerator is a key element in achieving the 40 to 45% overall power plant thermal efficiency.

  2. A modern concept for status oriented vibration monitoring of big turbogenerators

    International Nuclear Information System (INIS)

    Herz, F.; Theodor, P.

    1997-01-01

    The investigation of mechanical vibrations is an excellent method of showing the current condition of a machine. This paper deals with the vibrations monitoring of large turbo-generators. First the general aspects of monitoring, as well as diagnostic strategies and impact on the operation of the installation is discussed. An example of a condition-oriented vibration monitoring is the description of the 'Vibroview' system recently developed and installed in the Leibstadt nuclear power plant. (author) 16 figs., tabs., refs

  3. Stator Vibration Characteristic Identification of Turbogenerator among Single and Composite Faults Composed of Static Air-Gap Eccentricity and Rotor Interturn Short Circuit

    Directory of Open Access Journals (Sweden)

    Yu-Ling He

    2016-01-01

    Full Text Available This paper investigates the radial stator vibration characteristics of turbogenerator under the static air-gap eccentricity (SAGE fault, the rotor interturn short circuit (RISC fault, and the composite faults (CFs composed of SAGE and RISC, respectively. Firstly, the impact of the faulty types on the magnetic flux density (MFD is analyzed, based on which the detailed expressions of the magnetic pull per unit area (MPPUA on the stator under different performing conditions are deduced. Then, numerical FEM simulations based on Ansoft and an experimental study are carried out, taking the SDF-9 type fault simulating generator as the study object. It is shown that SAGE will increase the stator vibration at 2f (f is the electrical frequency which already exists even in normal condition, while RISC and CF will bring in stator vibrations at f, 2f, 3f, and 4f at the same time. The vibration amplitudes under CF are larger than those under RISC. As SAGE increases, the vibration amplitudes of each harmonic component under CF will all be increased, while the development of RISC will decrease the 2nd harmonic vibration but meanwhile increase the 4th harmonic vibration. The achievements of this paper are beneficial for fault identification and condition monitoring of the turbogenerator.

  4. Determination of Permissible Short-Time Emergency Overloading of Turbo-Generators and Synchronous Compensators

    Directory of Open Access Journals (Sweden)

    V. A. Anischenko

    2011-01-01

    Full Text Available The paper shows that failure to take into account variable ratio of short-time emergency overloading of turbo-generators (synchronous compensators that can lead to underestimation of overloading capacity or impermissible insulation over-heating.A method has been developed for determination of permissible duration of short-time emergency over-loading that takes into account changes of over-loading ratio in case of a failure.

  5. Validation of DIVA: an expert system for the diagnostic of turbo-generator vibrations

    International Nuclear Information System (INIS)

    Chevalier, R.; Ricard, B.; Tiarri, J.P.; Bonnet, J.C.

    1990-01-01

    The project presented in this paper concerns the development of an expert system dealing with the diagnosis of turbo-generator vibrations. DIVA - Diagnosis of Shaft Line Vibrations - is a joint project which is carried out by ALSTHOM, Electricite de France and Laboratoire de Marcoussis, research centre of CGE. This article first presents the organisation of the system and then the goals and results of the tests already achieved [fr

  6. Mathematical modeling of a fast-breeder-reactor generating unit

    International Nuclear Information System (INIS)

    Kim, V.E.; Golovach, E.A.; Senkin, V.I.

    1984-01-01

    Dynamics equations are given for a reactor, intermediate heat exchanger, steam generator, and turbogenerator. The dynamic characteristics of the generating unit are described when perturbations occur in grid frequency, turbine valves, and feedwater consumption

  7. Energy and exergy analysis of the turbo-generators and steam turbine for the main feed water pump drive on LNG carrier

    International Nuclear Information System (INIS)

    Mrzljak, Vedran; Poljak, Igor; Mrakovčić, Tomislav

    2017-01-01

    Highlights: • Two low-power steam turbines in the LNG carrier propulsion plant were investigated. • Energy and exergy efficiencies of both steam turbines vary between 46% and 62%. • The ambient temperature has a low impact on exergy efficiency of analyzed turbines. • The maximum efficiencies area of both turbines was investigated. • A method for increasing the turbo-generator efficiencies by 1–3% is presented. - Abstract: Nowadays, marine propulsion systems are mainly based on internal combustion diesel engines. Despite this fact, a number of LNG carriers have steam propulsion plants. In such plants, steam turbines are used not only for ship propulsion, but also for electrical power generation and main feed water pump drive. Marine turbo-generators and steam turbine for the main feed water pump drive were investigated on the analyzed LNG carrier with steam propulsion plant. The measurements of various operating parameters were performed and obtained data were used for energy and exergy analysis. All the measurements and calculations were performed during the ship acceleration. The analysis shows that the energy and exergy efficiencies of both analyzed low-power turbines vary between 46% and 62% what is significantly lower in comparison with the high-power steam turbines. The ambient temperature has a low impact on exergy efficiency of analyzed turbines (change in ambient temperature for 10 °C causes less than 1% change in exergy efficiency). The highest exergy efficiencies were achieved at the lowest observed ambient temperature. Also, the highest efficiencies were achieved at 71.5% of maximum developed turbo-generator power while the highest efficiencies of steam turbine for the main feed water pump drive were achieved at maximum turbine developed power. Replacing the existing steam turbine for the main feed water pump drive with an electric motor would increase the turbo-generator energy and exergy efficiencies for at least 1–3% in all analyzed

  8. Perspectives of application of synthetic diamonds in polyurethane compositions for development of new high thermal conductivity system of isolation of powerful turbogenerators

    International Nuclear Information System (INIS)

    Kensits'kij, O.G.; Vigovs'kij, O.V.; Khvalyin, D.Yi.

    2017-01-01

    Reviewed and analyzed components of modern high-voltage insulation of electrical machines. The expediency of increasing of heat-conducting properties of the system of isolation of stator winding of powerful turbogenerators is justified. The main ways of improving heat transfer in the insulation system the stator windings of the turbogenerators are presented and analyzed. Perspectives of application of composite material based on polyurethane with additives of synthetic diamonds for development of new high thermal conductivity system of isolation of powerful electrical machines are analyzed. The technology by which was created the prototype of the insulating material with the application of diamond powder in a polyurethane composition is described. Executed laboratory experimental researches of the electrophysical parameters of the sample developed insulating material. That showed the perspective of this direction of perfection of isolation.

  9. The Effect of Flywheel Unbalance on Gear Noise in the Hydraulic Power Plant Turbo-Generator

    Directory of Open Access Journals (Sweden)

    Tomeh Elias

    2017-01-01

    Full Text Available The Effect of Flywheel Unbalance on Gear Noise in the Hydraulic Power Plant Turbo-Generator. Hydraulic power plants are systems that produce electrical energy with high investment costs. In order to fulfil their goals, investments should create conditions for a safe production of energy in a long lasting and reliable way, and with the required power and quality. These goals are possible to reach by an optional control process linked to a systematic monitoring of the operating machinery state, using the method of vibration diagnostics. Lately, there has been an increase of noise level in the hydraulic power plants.

  10. Analysis of the accuracy of methods for the determination of the synchronous reactances and the characteristics of turbogenerator

    Directory of Open Access Journals (Sweden)

    Kostić Miloje M.

    2017-01-01

    Full Text Available The values of saturated synchronous reactances turbogenerator for d-axis and q axis are different, Xd,sat > Xq,sat and when their unsaturated equal value, Xd,u = Xq,u. The exact calculation these reactances is quite complex and is conducted only using the finite element method (FEM with experimental validation. In order to adapt to practical needs, the most important results are elaborated in the form of family magnetizing curves loaded machines for d and q axis. This enables more accurate calculation of saturated synchronous reactance, and on the basis of the excited current and the power angle, and accurate design of the capability diagram for overexcited regimes and underexcited regimes. Such a method of constructing the two families of curves is complex for practical application, however, uses a simpler procedure. The calculation results with the above simplifications are analyzed in the work so that the calculated values of power are compared with the given (measured values. It turns out that these differences are large, even, in the examples from famous literature, and be critical to use methods that are implemented and in computer programs.

  11. Regenerative Heater Optimization for Steam Turbo-Generation Cycles of Generation IV Nuclear Power Plants with a Comparison of Two Concepts for the Westinghouse International Reactor Innovative and Secure (IRIS)

    International Nuclear Information System (INIS)

    Williams, W.C.

    2002-01-01

    The intent of this study is to discuss some of the many factors involved in the development of the design and layout of a steam turbo-generation unit as part of a modular Generation IV nuclear power plant. Of the many factors involved in the design and layout, this research will cover feed water system layout and optimization issues. The research is arranged in hopes that it can be generalized to any Generation IV system which uses a steam powered turbo-generation unit. The research is done using the ORCENT-II heat balance codes and the Salisbury methodology to be reviewed herein. The Salisbury methodology is used on an original cycle design by Famiani for the Westinghouse IRIS and the effects due to parameter variation are studied. The vital parameters of the Salisbury methodology are the incremental heater surface capital cost (S) in $/ft 2 , the value of incremental power (I) in $/kW, and the overall heat transfer coefficient (U) in Btu/ft 2 -degrees Fahrenheit-hr. Each is varied in order to determine the effects on the cycles overall heat rate, output, as well as, the heater surface areas. The effects of each are shown. Then the methodology is then used to compare the optimized original Famiani design consisting of seven regenerative feedwater heaters with an optimized new cycle concept, INRC8, containing four regenerative heaters. The results are shown. It can be seen that a trade between the complexity of the seven stage regenerative Famiani cycle and the simplicity of the INRC8 cycle can be made. It is desired that this methodology can be used to show the ability to evaluate modularity through the value of size a complexity of the system as well as the performance. It also shows the effectiveness of the Salisbury methodology in the optimization of regenerative cycles for such an evaluation

  12. 7 CFR 1755.510 - Construction and assembly unit drawings.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Construction and assembly unit drawings. 1755.510..., AND STANDARD CONTRACT FORMS § 1755.510 Construction and assembly unit drawings. (a) The construction and assembly unit drawings in this section shall be used by borrowers to assist the installer in...

  13. Construction: first of St. Lucie unit 2 successes

    International Nuclear Information System (INIS)

    Conway, W.F.

    1989-01-01

    The Nuclear Regulatory Commission (NRC) granted a full power operating license for St. Lucie Unit 2 on June 10, 1983, just six years after construction began. The industry average for nuclear power plant construction during this time was approximately ten years. The rate of completion had a positive effect on the cost of the facility. The price of the unit was $1.42 billion as compared to the $2 billion to $5 billion range experienced by other utilities for nuclear plants. These accomplishments were not serendipitous but the results of management techniques and personnel attitudes involved in the construction of the unit. More importantly, many of these same techniques and attitudes have now become part of a quality improvement program at St Lucie and are reflected in its performance indicators. This paper analyzes the construction success of St Lucie Unit 2 and demonstrates that excellent performance in the construction phase can be carried over to the operation of a facility

  14. Impacts of the turbogenerator reactive operation in the nuclear fuel burnup

    International Nuclear Information System (INIS)

    Oliveira, Helio Ricardo V. de; Martinez, Aquilino S.

    2002-01-01

    The parameterization of the losses in a turbogenerator in function of an operation with the electrical system reactive allowed to model in a simple and exact way the equations that define and they quantify the additional of nuclear potency that it should be generated by a reactor, in order to maintain the commitment with the national system operator, that is, the electric active power contracted. starting from this additional of nuclear power it was modeled the additional burn up of the fuel elements, as well as the numbers of effective days to full power wasted. it was promoted a safety analysis and some limitations due to the reactive operation of the electrical system. inside of this context it was made a financial evaluation in which we ask some questions to companies and government organs in order to define what losses are acceptable and also the reason why we don't use other technician resources such as: increase of the electrical mesh, electrical power injection in strategic points, capacitor banks and increase of the number the electrical plants. (author)

  15. A TURBO-GENERATOR DESIGN SYNTHESIS BASED ON THE NUMERICAL-FIELD CALCULATIONS AT VARYING THE NUMBER OF STATOR SLOTS

    Directory of Open Access Journals (Sweden)

    V. I. Milykh

    2016-12-01

    Full Text Available Purpose. The work is dedicated to the presentation of the principle of construction and implementation of an automated synthesis system of the turbo-generator (TG electromagnetic system in the case of its modernization. This is done on the example of changing the number of the stator core slots. Methodology. The basis of the synthesis is a TG basic construction. Its structure includes the mathematical and physical-geometrical models, as well as the calculation model for the FEMM software environment, providing the numerical calculations of the magnetic fields and electromagnetic parameters of TG. The mathematical model links the changing and basic dimensions and parameters of the electromagnetic system, provided that the TG power parameters are ensured. The physical-geometrical model is the geometric mapping of the electromagnetic system with the specified physical properties of its elements. This model converts the TG electromagnetic system in a calculation model for the FEMM program. Results. Testing of the created synthesis system is carried out on the example of the 340 MW TG. The geometric, electromagnetic and power parameters of its basic construction and its new variants at the different numbers of the stator slots are compared. The harmonic analysis of the temporal function of the stator winding EMF is also made for the variants being compared. Originality. The mathematical model, relating the new and base parameters of TG at the changing of the number of the stator slots is created. A Lua script, providing the numerical-field calculations of the TG electromagnetic parameters in the FEMM software environment is worked out. Construction of the constructive and calculation models, the numerical-field calculations and delivery of results are performed by a computer automatically, that ensures high efficiency of the TG design process. Practical value. The considered version of the TG modernization on the example of changing the number of the

  16. Designing a nuclear power plant with 1000 MW WWER-type units

    Energy Technology Data Exchange (ETDEWEB)

    Berkovich, V; Kaloshin, J; Tatarnikov, V; Shenderovich, A

    1977-06-01

    A brief description is presented of a WWER-1000 nuclear power plant also considering its environmental impact and the problem of core poisoning. The following indicators are graphically shown in relation to the reactor output: turbogenerator unit outputs, efficiency, specific capital costs and own costs of electric power generated by the Voronezh nuclear power plant. Also listed are the specific consumption of metal and concrete, specific equipment weight and the specific volume of the buildings of the main generating unit as well as the cross section thereof.

  17. Completion of latest ABWR 'SHIKA Unit 2' construction

    International Nuclear Information System (INIS)

    Yamazaki, Tatsuhiro; Yoshimoto, Yuichiro

    2007-01-01

    The Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Company, Inc. is the first Advanced BWR unit built in Japan by a single contractor and it is among the largest nuclear power stations in Japan. Its construction started in August 1999 when the first construction permit was issued. The design and construction of the plant was carried out with utmost care for betterment of operational safety, reliability and economy. The construction advanced on schedule and the plant entered its commercial operation in March 2006 as planned. Hitachi, Ltd. supplied the entire plant from design, fabrication and construction including the reactor and steam turbine generation system. In the design and construction of the plant, the most advanced technology has been applied in order to match the civil construction process and aim to supply safest, reliable and economical power plant. (author)

  18. Designing a nuclear power plant with 1000 MW WWER-type units

    International Nuclear Information System (INIS)

    Berkovich, V.; Kaloshin, J.; Tatarnikov, V.; Shenderovich, A.

    1977-01-01

    A brief description is presented of a WWER-1000 nuclear power plant also considering its environmental impact and the problem of core poisoning. The following indicators are graphically shown in relation to the reactor output: turbogenerator unit outputs, efficiency, specific capital costs and own costs of electric power generated by the Voronezh nuclear power plant. Also listed are the specific consumption of metal and concrete, specific equipment weight and the specific volume of the buildings of the main generating unit as well as the cross section thereof. (J.B.)

  19. Main summaries of construction of the Rovno NPP third unit

    International Nuclear Information System (INIS)

    Smoktij, I.P.; Tsetsenko, I.K.

    1987-01-01

    The main technical and economic indices attained at the Rovno and Zaporozhe NPPs are considered. The estimated costs of the main installations of the building site, organizations participating in construction, labor forces at different building sections, duration of different stages of construction, actual labor costs associated with the reactor unit, volumes of construction and installation work, the construction schedule for the Rovno Unit-3 are given

  20. Formalizing the Process of Constructing Chains of Lexical Units

    Directory of Open Access Journals (Sweden)

    Grigorij Chetverikov

    2015-06-01

    Full Text Available Formalizing the Process of Constructing Chains of Lexical Units The paper investigates mathematical aspects of describing the construction of chains of lexical units on the basis of finite-predicate algebra. Analyzing the construction peculiarities is carried out and application of the method of finding the power of linear logical transformation for removing characteristic words of a dictionary entry is given. Analysis and perspectives of the results of the study are provided.

  1. 25 years of experience with closed cycle vapor turbogenerators as primary power source in remote telecommunications projects in Russia and CIS countries

    Energy Technology Data Exchange (ETDEWEB)

    Gropper, J. [ORMAT Industries Ltd., Yavne (Israel)

    2000-07-01

    One of the most severe problems confronting telecommunications projects in extreme arctic environment conditions, with temperatures as low as -60 C, is the supply of continuous, reliable remote power for unattended microwave repeater stations that in many cases cannot be reached by maintenance technicians for months at a time. Another important problem is that the telecommunications equipment must be kept at temperatures between 0 C and +45 C in order to ensure correct electronics operation. The obvious, simple solution of having an electrical heater in the equipment shelter is not practical because of the power required for such a heater. The use of specially designed, arctic type, closed cycle vapor turbogenerators (CCVT) and their associated non-electric heating systems in arctic telecommunication systems has solved both problems: reliable remote power in the range of 400 to 2500 Watts in provided with maintenance requirements reduced to a visit only once in 6 months or more, and required temperature ranges in equipment shelters are maintained, assuring correct operation of the sensitive electronics, without any need of electrical power. During the last 25 years, many major telecommunication projects in Siberia, Alaska and Antarctica have been designed to use and continue to use over 1200 arctic type closed cycle vapor turbogenerators. The CCVTs are designed to operate at nominal power in a range of temperatures from -60 to +45 C and at wind velocity of 120 km/hr, with acceptable gusts of 160 km/hr. They can be fuelled by either arctic kerosene or diesel fuel, or by natural or liquefied gas (LPG) and provide 24 or 48 VDC to the telecommunications equipment. The non-electric heating system associated with the CCVT draws extra heat accumulated in the CCVT's vapor turbogenerator in winter to vaporize a fluid that will transmit 1000 kcal/hr of heat to the equipment shelter or room where telecommunication equipment is located. The heating system is

  2. General review of diagnostic systems in EDF PWR units

    International Nuclear Information System (INIS)

    Chevalier, R.; Brasseur, S.; Ricard, B.

    1998-01-01

    Since the beginning of the French nuclear program, Electricite de France (EDF) has looked for ways to improve the availability and safety of its nuclear units. Therefore, monitoring systems on turbogenerators, reactor coolant pumps, primary circuits and core internal structures were designed by the Research and Development Division and implemented with technologies available during the 1970's. However, mainly because of difficulties for data interpretation by plant personnel, EDF subsequently decided to design and develop different tools to help plant operators to process a diagnosis: - a new generation of the Monitoring and Diagnostic System called PSAD, - expert systems for diagnosis on reactor coolant pumps (RCP) 'DIAPO' and turbogenerator units (TG) 'DIVA', - diagnostic guides written for most equipment pending the installation of new monitoring and diagnosis systems. The first version of PSAD, installed in five units, performs on-line monitoring of the turbogenerator shaft line, steam inlet valves, the reactor coolant pumps and the generator stator. The second version not yet implemented, will include Loose Part Detection (LPD) and Core Internal Structure Monitoring (CISM). The level of diagnosis achieved by PSAD depends on the component monitored. The TG and RCP monitoring functions of PSAD compute high level diagnosis descriptors such as natural frequencies and long term trends but do not elaborate a diagnosis automatically. However, a diagnostic assistance window is available on-line, whenever a warning message is displayed, whether for immediate or later action. The window presents a diagnostic approach whose purpose is to find the causes of the symptoms observed. This diagnosis approach is automated in the DIVA and DIAPO expert systems. Numerous potential faults can be identified for both systems thanks to a hierarchy of abnormal situations. The user interactively answers questions when information is needed to progress in the diagnosis. The resulting

  3. Construction method of pre assembled unit of bolt sphere grid

    Science.gov (United States)

    Hu, L. W.; Guo, F. L.; Wang, J. L.; Bu, F. M.

    2018-03-01

    The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits.

  4. Optimal design of compact organic Rankine cycle units for domestic solar applications

    DEFF Research Database (Denmark)

    Barbazza, Luca; Pierobon, Leonardo; Mirandola, Alberto

    2014-01-01

    criteria, i.e., compactness, high performance and safe operation, are targeted by adopting a multi-objective optimization approach modeled with the genetic algorithm. Design-point thermodynamic variables, e.g., evaporating pressure, the working fluid, minimum allowable temperature differences......Organic Rankine cycle turbogenerators are a promising technology to transform the solar radiation harvested by solar collectors into electric power. The present work aims at sizing a small-scale organic Rankine cycle unit by tailoring its design for domestic solar applications. Stringent design...

  5. Preparation phase of Mochovce NPP unit 3 and 4 construction completion

    International Nuclear Information System (INIS)

    Cillik, I.; Tvaroska, V.; Liska, P.; Ziman, V.

    2005-01-01

    In this presentation authors deal with preparation phase of Mochovce NPP unit 3 and 4 construction completion. The preparation phase of the Mochovce unit 3 and 4 construction completion gives following main outputs: (a) Detail Safety Concept gives definitive complex safety and technical improvement of MO34, more precise analysis of the total cost of construction completion, a list of potential suppliers and construction completion time schedule; (b) Appendices of Basic Design Documentation and Preliminary SAR serves as basic documentation for UJD SR decision making according to Law No. 541 for start of Realization Phase; (c) The Preparation Phase represents effective tool for start of MO34 construction completion Realization Phase.

  6. Outline of construction and facility features of Onagawa nuclear power station Unit No. 2

    International Nuclear Information System (INIS)

    Umimura, Yoshiharu; Tsunoda, Ryohei; Watanabe, Kazunori

    1996-01-01

    Tohoku Electric Power Company promotes development of various power sources to provide a stable supply of electricity in the future, and nuclear power takes a leading part. In August 1989, construction of Onagawa nuclear power plant Unit No. 2 (825MW) was started, following Unit No. 1 (524MW) which went on line in 1984 as Tohoku Electric's first nuclear power plant unit. Unit No. 2 began commercial operation in July 1995 through satisfactory construction work such as RPV hydraulic test in March 1994, fuel loading in October 1994, and various startup tests in each power stage. The design and construction of Unit No. 2 reflect construction and operation experience gained from Unit No. 1, and the latest technology, including that of the LWR Improvement and Standardization Program, was adopted to enhance facility reliability, improve operation and maintenance performance, and reduce worker dosage. Features of the facility, construction techniques, and a description of preoperation of Onagawa nuclear power plant Unit No. 2 are described in this paper. (author)

  7. Case history of a 94 MVA turbo-generator retired after 190.000 hours of service by defects revealed by boresonic in-service inspection

    International Nuclear Information System (INIS)

    Porro, F.; Santoro, M.

    1990-01-01

    The case-history of a turbogenerator manufactured by Ansaldo on 1957 and turned on operation on 1958 then retired after 30 years of operation, with a total of 190.000 hours of service, by defects revealed trough boresonic inspections, will be presented. The rotor was inspected a first time after 130.000 hours of service and was overbored in order to allow further service operations. After other 60.000 hours of service operation the rotor underwent to a new in-service inspection that showed an unacceptable condition. The rotor, retired from service, has been destined to destructive tests in order to verify non-destructive predictions

  8. Unit soil loss rate from various construction sites during a storm.

    Science.gov (United States)

    Maniquiz, Marla C; Lee, Soyoung; Lee, Eunju; Kong, Dong-Soo; Kim, Lee-Hyung

    2009-01-01

    The Korean Ministry of Environment (MOE) opts to establish an ordinance having a standard specifying an allowable soil loss rate applicable to construction projects. The predicted amount of soil loss from a construction site exceeding the standard can be used to calculate the percent reduction necessary to comply with the ordinance. This research was conducted to provide a basis to establish a standard by investigating the unit soil loss rates in the three phases of development: pre-construction, active construction and post construction based from 1,036 Environmental Impact Assessment (EIA) reports within the six-year period (2000-2005). Based on the findings, several factors affect the magnitude of soil loss rates particularly storm characteristics, site slope, soil type, location from rivers, as well as the type of construction activity. In general, the unit soil loss rates during the active construction phase are extremely higher in comparison to undisturbed areas; in magnitude of 7 to 80 times larger in urban areas and 18 to 585 times in rural areas. Only between 20 to 40 percent of the soil loss rates was contributed at pre- and post- construction phases indicating that the active construction phase is the most important phase to control.

  9. Cost Indexing and Unit Price Adjustments for Construction Materials

    Science.gov (United States)

    2012-10-30

    This project was focused on the assimilation of information regarding unit price adjustment clauses, or PACs, : that are offered for construction materials at the state Departments of Transportation (DOTs). It is intended to : provide the South Carol...

  10. Factors Affecting Productivity in the United States Naval Construction Force

    National Research Council Canada - National Science Library

    Morton, Darren

    1997-01-01

    By using a craftsman questionnaire, this thesis identifies and ranks the most important factors impairing Petty Officer productivity and morale in the United States Naval Construction Force (Seabees...

  11. Islay LIMPET project monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Heath, T.

    2002-07-01

    Wavegen was contracted by the DTI as part of its Sustainable Energy Programmes to monitor and report on the final stages of the construction, installation of turbo-generation equipment, commissioning and operation of the LIMPET wave energy system. The report discusses the choice of technology, where the system was installed, power take off, construction of the collector, installation of the turbo-generator, maintenance, operation, management and planning issues. The performance of the system was found to be poorer than expected and the reasons for this were identified. The main conclusions were that the system is sufficiently robust to operate in the marine environment and downtimes are expected to be short.

  12. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  13. Cultural differences between construction professionals in Denmark and United Kingdom

    DEFF Research Database (Denmark)

    Hancock, M.R.

    /Building Surveyors in relation to the Services Procurement Directive of the European Union. It is recommended that further studies be undertaken in order to develop a cultural profiling model and methods for the building sector to help identify areas of potential conflicts. The report is aimed at construction......This report presents the results of an investigation into cultural differences between professional members of the construction sector of Denmark and the United Kingdom. In particular it refers to differences between Arkitekter/Architects, Civilingeniører/Civil Engineers and Bygningskonstruktører...

  14. Quality control for the construction of Ikata Nuclear Power Station No. 2 Unit

    International Nuclear Information System (INIS)

    Onishi, Akiyoshi

    1983-01-01

    In the construction of No. 2 unit in Ikata Nuclear Power Station, Shikoku Electric Power Co., the quality control was practiced making effective use of the experience in preceding stations including the Three Mile Island station, U.S., and improving those. The construction works were also performed in consideration of ensuring the safe running of No. 1 unit in commercial operation. In this report, first the outline of No. 2 unit facility and the quality control in the construction processes are described sequentially. For the comprehensive quality control activity over a series of plant design, manufacturing, installation and commissioning processes, the quality control policy was fixed, the system was established, the plan was prepared, and the quality control was promoted as planned and systematically. The outline of the quality control in each stage is described as follows. Design stage: It was implemented for the confirmation of applicable standards and references, the management of drawings submitted for approval, the selection of materials used, the coordination among sub-contractors, design change and the reflection of experience in preceding stations. Manufacturing stage. It was performed for material control, manufacturing management, factory test and control. Installation stage. It was practiced for the management of installation works, the inspection during the installation, and the check-up and control after the installation. Several quality control items were implemented also in the method of construction works and construction management. (Wakatsuki, Y.)

  15. Expanded Organic Building Units for the Construction of Highly Porous Metal-Organic Frameworks

    NARCIS (Netherlands)

    Kong, G.Q.; Han, Z.D.; He, Y.; Qu, S.; Zhou, W.; Yildirim, T.; Krishna, R.; Zou, C.; Chen, B.; Wu, C.D.

    2013-01-01

    wo new organic building units that contain dicarboxylate sites for their self-assembly with paddlewheel [Cu2(CO2)4] units have been successfully developed to construct two isoreticular porous metal-organic frameworks (MOFs), ZJU-35 and ZJU-36, which have the same tbo topologies (Reticular Chemistry

  16. Autoclaved aerated concrete : shaping the evolution of residential construction in the United States.

    OpenAIRE

    Bukoski, Steven C.

    1998-01-01

    CIVINS (Civilian Institutions) Thesis document Precast Autoclaved Aerated Concrete (AAC) is a proven construction material used in Europe for over 70 years. Introduced to the United States in 1990, construction thus far is limited to commercial and custom borne applications. Premium benefits include energy efficiency and resistance to natural disaster and pests. Despite being the leading residential construction material in Europe and Japan, lumber is the leading material of choice in the ...

  17. Transmutor demo unit and thermal into electrical energy transformation problems

    International Nuclear Information System (INIS)

    Matal, O.; Fiedler, J.

    1999-01-01

    In the three circuits layout of the transmutor the heat is transferred from the primary through the secondary circuits by a favourable heat carrier into the tertiary circuit where the thermal into electrical energy transformation in turbo-generator comes into force. Properties as well as parameters of the heat carrier in the secondary circuit affect basically both the conceptual layout of the tertiary circuit and consequently investments costs for its realization and the effectiveness of the transformation of thermal into electrical energy. For several heat carriers considered for the transmutor secondary circuit particular tertiary circuit concepts for the demonstration transmutor unit of approx. 15 W thermal power rate are analyzed, layout features and possibilities of turbogenerator selection are commented and investment costs as well as effectiveness of thermal into electrical energy transformation are estimated. Some of the results are as follows: (i) Heat carrier properties influence thermodynamics of the TDU water/steam cycle substantially. One of the dominant parameters is the melting (freezing) temperature of the heat carrier. (ii) Heat carrier properties influence investment costs of components of the TDU tertiary circuit substantially. Dominantly influenced are costs of the steam generator, steam turbine and high pressure regeneration system. (iii) If the heat carrier has to be a molten salt than a salt with a low melting temperature is recommended to be selected, for example KHF2. (iv) Eutectic alloy Pb-Bi as the heat carrier serves changes to design the TDU with efficient thermodynamics, with acceptable low investment costs of the tertiary as well as secondary circuit components and with an acceptable level of the nuclear safety

  18. Formation of integrated structural units using the systematic and integrated method when implementing high-rise construction projects

    Science.gov (United States)

    Abramov, Ivan

    2018-03-01

    Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.

  19. Construction and start-up tests for Unit No. 5 of Fukushima Daiichi Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Fujita, T; Sunami, Y; Ishii, N; Yokojima, T [Toshiba Corp., Kawasaki, Kanagawa (Japan)

    1978-12-01

    This unit, with an output capacity of 874 MWe, was completed by Toshiba last April on the basis of the actual operation records of the units previously completed and the experience in construction. Since its completion it has continued very excellent operation, with no emergency stop. This article is a description of the Unit 5, about: (1) the design and major points of improvement; (2) the construction work and cleaning of the plant; and (3) the operation tests, the use of the first automatic fuel exchanger, and the plant management system including the rust-preventive measures for two years since the oil-crisis.

  20. Measurements of vertical displacement of power station buildings using an automatic stationary hydrostatic measuring system; Anwendung des automatisierten stationaeren hydrostatischen Messsystems fuer die Aufnahme der Vertikalverschiebungen an den Objekten der Kern- und Waermekraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Lechner, J [Forschungsinstitut fuer Geodaesie, Topographie und Kartographie, Zdiby (Czechoslovakia)

    1997-12-31

    The contribution describes hydrostatic stationary measuring systems for measurements of height variations of a turbine unit. The measuring system developed at the research institute and the algorithms for calibration, measurement and evaluation are presented. Measurements were made on a 500 MW turbogenerator unit at different states of operation. (orig.) [Deutsch] Der Beitrag enthaelt eine kurze Uebersicht ueber die hydrostatischen stationaeren Messsysteme fuer das Gebiet der Messung der Hoehenaenderung eines Grossturbinentisches. Es wird das automatische stationaere hydrostatische Messsystem, das im Forschungsinstitut entwickelt wurde, der Algorithmus der Kalibrierung, der Messung und der Auswertung der Messergebnisse vorgestellt. Es wird das Messergebnis der Vertikalverschiebungen der Konstruktion des Turbogenerators mit der Leistung 500 Megawatt bei seinem verschiedenen Betriebszustand angefuehrt. (orig.)

  1. Measurements of vertical displacement of power station buildings using an automatic stationary hydrostatic measuring system; Anwendung des automatisierten stationaeren hydrostatischen Messsystems fuer die Aufnahme der Vertikalverschiebungen an den Objekten der Kern- und Waermekraftwerke

    Energy Technology Data Exchange (ETDEWEB)

    Lechner, J. [Forschungsinstitut fuer Geodaesie, Topographie und Kartographie, Zdiby (Czechoslovakia)

    1996-12-31

    The contribution describes hydrostatic stationary measuring systems for measurements of height variations of a turbine unit. The measuring system developed at the research institute and the algorithms for calibration, measurement and evaluation are presented. Measurements were made on a 500 MW turbogenerator unit at different states of operation. (orig.) [Deutsch] Der Beitrag enthaelt eine kurze Uebersicht ueber die hydrostatischen stationaeren Messsysteme fuer das Gebiet der Messung der Hoehenaenderung eines Grossturbinentisches. Es wird das automatische stationaere hydrostatische Messsystem, das im Forschungsinstitut entwickelt wurde, der Algorithmus der Kalibrierung, der Messung und der Auswertung der Messergebnisse vorgestellt. Es wird das Messergebnis der Vertikalverschiebungen der Konstruktion des Turbogenerators mit der Leistung 500 Megawatt bei seinem verschiedenen Betriebszustand angefuehrt. (orig.)

  2. Unit 1 and Unit 2 Nuclear Power Plant Mochovce construction finishing from primary contractor of technological part. Skoda Praha a. s. point of view

    International Nuclear Information System (INIS)

    Horky, F.

    2000-01-01

    In this paper the history of delivery of technological part for NPP V-1 Mochovce as well as of reconstruction and safety improvements by the Skoda Praha a.s. is presented. Primary contractor of technological part Skoda Praha together with its final suppliers proved ability to realize under hard conditions such a complicated work what was indisputedly Units 1 and 2 finishing. Company proved capability to conform itself flexibly in the course of work to requirements of customer for realization of safety measures which means that Units 1 and 2 fully satisfy international standards. By fulfilment of primary contractor of technology obligations and above all by takeover of complex responsibility for both Units putting in operation including responsibility for 'past' Skoda Praha put away one of basic problems which occurred in decision making to whom will be assigned construction finishing contract. These facts fully qualify Skoda Praha to be selected for possible Units 3 and 4 construction finishing as one of chief construction finishing participant

  3. A comparative study of Japan and United States nuclear enterprise: Industry structure and construction experience

    International Nuclear Information System (INIS)

    Hinman, G.W.; Lowinger, T.C.

    1987-01-01

    Both Japan and the United States have undertaken major programs to utilize nuclear power for central station electricity generation. Over the past 20 years, the Japanese have developed their own construction and government regulatory institutions and now have an essentially independent domestic nuclear power program. Nuclear construction and government oversight of nuclear power have developed somewhat differently in Japan and the United States, reflecting to some extent the two countries' different business and social cultures. In the United States the vendor and utility industries are much more fragmented than those in Japan, and construction projects are carried out on a more competitive basis. The Japanese industry operates through a few well-established consortia while the U.S. industry does not. Relations among the national government, the vendors, and the electric utilities tend to be cooperative in Japan while they are more adversarial in the Untied States. This paper discusses these topics in a framework of a comparative study of the countries' nuclear industries. Whether because of the factors mentioned above or for other reasons the success of nuclear power in Japan and the United States has differed dramatically in recent years. This paper compares the performance of the nuclear enterprise in these two countries in terms of the physical attributes of the plants themselves, the labor required to build them, and the construction times required. It also discusses the relationship between initial estimates of costs and schedules and actual results achieved. On all counts, recent Japanese performance has been better than in the United States

  4. Introduction of construction management system for preparation work of Shimane Nuclear Power Station Unit-3

    International Nuclear Information System (INIS)

    Sasaki, Yutaka; Tsumura, Isamu; Hayashi, Minoru; Nakamoto, Kenji

    2005-01-01

    The construction management system aims to have information on the construction management between the Chugoku Electric Power Co. Inc. and each contractor, and to work efficiently. The system has been operating during about half year. The system manages the manufacturing process, safety and quality. The aims, development process, characteristics, network construction of the system are reported. As outline of the construction management system, functions and construction management of each process, safety and quality and ITV camera are explained. The system will be used at construction of Shimane nuclear power station unit-3. (S.Y.)

  5. The new VLT-DSM M2 unit: construction and electromechanical testing

    Science.gov (United States)

    Gallieni, Daniele; Biasi, Roberto

    2013-12-01

    We present the design, construction and validation of the new M2 unit of the VLT Deformable Secondary Mirror. In the framework of the Adaptive Optics Facility program, ADS and Microgate designed a new secondary unit which replaces the current Dornier one. The M2 is composed by the mechanical structure, a new hexapod positioner and the Deformable Secondary Mirror unit.The DSM is based on the well proven contactless, voice coil motor technology that has been already successfully implemented in the MMT, LBT and Magellan adaptive secondaries, and is considered a promising technical choice for the E-ELT M4 and the GMT ASM. The VLT adaptive unit has been fully integrated and, before starting the optical calibration, has completed the electromechanical characterization, focused on the dynamic performance. With respect to the previous units we introduced several improvements, both in hardware and control architecture that allowed achieving a significant enhancement of the system dynamics and reduction of power consumption.

  6. The Measurement of Time: Children's Construction of Transitivity, Unit Iteration, and Conservation of Speed.

    Science.gov (United States)

    Long, Kathy; Kamii, Constance

    2001-01-01

    Interviews 120 children in kindergarten and grades 2, 4, and 6 with five Piagetian tasks to determine the grade level at which most have constructed transitive reasoning, unit iteration, and conservation of speed. Indicates that construction of the logic necessary to make sense of the measurement of time is generally not complete before sixth…

  7. Impacts of the turbogenerator reactive operation in the nuclear fuel burnup; Impactos da operacao reativa do turbogerador na queima do combustivel nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Helio Ricardo V. de; Martinez, Aquilino S. [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia. Programa de Engenharia Nuclear

    2002-07-01

    The parameterization of the losses in a turbogenerator in function of an operation with the electrical system reactive allowed to model in a simple and exact way the equations that define and they quantify the additional of nuclear potency that it should be generated by a reactor, in order to maintain the commitment with the national system operator, that is, the electric active power contracted. starting from this additional of nuclear power it was modeled the additional burn up of the fuel elements, as well as the numbers of effective days to full power wasted. it was promoted a safety analysis and some limitations due to the reactive operation of the electrical system. inside of this context it was made a financial evaluation in which we ask some questions to companies and government organs in order to define what losses are acceptable and also the reason why we don't use other technician resources such as: increase of the electrical mesh, electrical power injection in strategic points, capacitor banks and increase of the number the electrical plants. (author)

  8. 2007 Effect of Changes in Layout Shape on Unit Construction Cost

    African Journals Online (AJOL)

    ezra

    The shape of a building layout is the spatial attribute that defines the outline of the building. ... The results of this study indicate that perimeter-to-floor ratio, unit construction ... Design variables have been defined as the .... The objective of this paper is to explore the effect ... preparation of cost estimate, changing of design.

  9. Present status of Tomari No.3 unit construction and efforts for preventing global warming

    International Nuclear Information System (INIS)

    Ouchi, Tamotsu; Sakai, Ichiro; Makino, Takeshi

    2009-01-01

    Hokkaido Electric Power Company, Inc. (HEPCO) supplies electricity to almost all area of Hokkaido. Its service area accounts for about one-fifth of Japan's area, on the other hand, the population of the service area only accounts for 4.4% of the nation. This means Hokkaido's nature is precious, and one of HEPCO's missions is to protect such environment, with providing stable electricity. Therefore, nuclear power, which does not emit greenhouse effect gas for generation, is becoming more important. HEPCO's operating nuclear power stations are Tomari No.1 unit and No.2 unit. Their generation capacity is 579 MW respectively. Now, No.3 unit is under construction. Its generation capacity is 912 MW and it will be operational in December 2009. In Hokkaido, about one fourth of electricity is now produced by nuclear power, however, after Tomari No.3 is completed, more than 40% of electricity will be produced by nuclear. So, Tomari No.3 unit will contribute stable supply of electricity in the first half of 21st century and prevent global warming in Hokkaido. This paper describes the present status of Tomari No.3 unit construction with major specifications and our efforts to prevent global warming. (author)

  10. Present status of Tomari No.3 unit construction and efforts for preventing global warming

    International Nuclear Information System (INIS)

    Ouchi, Tamotsu

    2008-01-01

    Hokkaido Electric Power Company, Inc. (HEPCO) supplies electricity to almost all area of Hokkaido. Its service area accounts for about one-fifth of Japan's area, on the other hand, the population of the service area only accounts for 4.4% of the nation. This means Hokkaido's nature is precious, and one of HEPCO's missions is to protect such environment, with providing stable electricity. Therefore, nuclear power, which does not emit greenhouse effect gas for generation, is becoming more important. HEPCO's operating nuclear power stations are Tomari No.1 unit and No.2 unit. Their generation capacity is 579 MW respectively. Now, No.3 unit is under construction. Its generation capacity is 912 MW and it will be operational in December 2009. In Hokkaido, about one fourth of electricity is now produced by nuclear power, however, after Tomari No.3 is completed, about 40% of electricity will be produced by nuclear. So, Tomari No.3 unit will contribute stable supply of electricity in the first half of 21st century and prevent global warming in Hokkaido. This paper describes the present status of Tomari No.3 unit construction with major specifications and our efforts to prevent global warming. (author)

  11. Analysis of the accident in the second power-generating unit of the Chernobyl nuclear power plant caused by inadequate makeup of the reactor cooling loop

    International Nuclear Information System (INIS)

    Vasil'chenko, V.N.; Kramerov, A.Ya.; Mikhailov, D.A.

    1995-01-01

    The accident in the second power-generating unit of the Chernobyl nuclear power plant on October 11, 1991 was the result of unauthorized connection of the TG-4 turbogenerator, which was shut down for repairs, into the grid (in the off-design asynchronous engine mode), and this resulted in a serious fire in the machine room and subsequent failure of systems which are important for safety and which ensure the design mode of reactor cooling: These were primarily failures of the feed and emergency feed pumps and failure of the BRU-B control valve, which regulates steam release during cooling

  12. A regulatory perspective of the role of construction in revitalizing the United States nuclear industry

    International Nuclear Information System (INIS)

    Stello, V. Jr.

    1983-01-01

    Technical and managerial experience in nuclear power plant construction is presented from the perspective of the United States Nuclear Regulatory Commission (NRC). In the context of actions that would contribute to revitalizing the nuclear industry in the United States of America, greater effectiveness of utility management during construction is proposed. The reasons why management effectiveness is so important are developed beginning with summaries of defects that were built into several US plants under construction. The root causes of these significant defects were management failures. In terms of benefits, effective management is important because of its effects on nuclear safety, project construction costs, and future reliability of the plant after commissioning. Actions that would enhance good management include emphasizing the inseparable nature of production and quality, that quality cannot be inspected into a plant, and that a strong construction management staff and exchanges of experience and information are essential. Techniques that have been used successfully in construction management are discussed. NRC and industry initiatives are in progress to improve management responsibility and learning from experience. Projects include Owner's Certification, assessments of licensee performance, fostering good practices across the industry, and improving the NRC inspection programme. Revitalization will not be easy, but it is achievable. (author)

  13. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  14. Fuqing nuclear power of nuclear steam turbine generating unit No.1 at the implementation and feedback

    International Nuclear Information System (INIS)

    Cao Yuhua; Xiao Bo; He Liu; Huang Min

    2014-01-01

    The article introduces the Fuqing nuclear power of nuclear steam turbine generating unit no.l purpose, range of experience, experiment preparation, implementation, feedback and response. Turn of nuclear steam turbo-generator set flush, using the main reactor coolant pump and regulator of the heat generated by the electric heating element and the total heat capacity in secondary circuit of reactor coolant system (steam generator secondary side) of saturated steam turbine rushed to 1500 RPM, Fuqing nuclear power of nuclear steam turbine generating unit no.1 implementation of the performance of the inspection of steam turbine and its auxiliary system, through the test problems found in the clean up in time, the nuclear steam sweep turn smooth realization has accumulated experience. At the same time, Fuqing nuclear power of nuclear steam turbine generating unit no.1 at turn is half speed steam turbine generator non-nuclear turn at the first, with its smooth realization of other nuclear power steam turbine generator set in the field of non-nuclear turn play a reference role. (authors)

  15. Final Report: Self-Consolidating Concrete Construction for Modular Units

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, Russell [Georgia Inst. of Technology, Atlanta, GA (United States); Kahn, Lawrence [Georgia Inst. of Technology, Atlanta, GA (United States); Kurtis, Kimberly [Georgia Inst. of Technology, Atlanta, GA (United States); Petrovic, Bojan [Georgia Inst. of Technology, Atlanta, GA (United States); Loreto, Giovanni [Georgia Inst. of Technology, Atlanta, GA (United States); Van Wyk, Jurie [Westinghouse Inc., Cranberry Township, PA (United States); Canterero-Leal, Carlos [Westinghouse Inc., Cranberry Township, PA (United States)

    2016-07-29

    This report focuses on work completed on DE-NE0000667, Self-Consolidating Concrete for Modular Units, in connection with the Department of Energy Nuclear Energy Enabling Technologies (DOE-NEET) program. This project was completed in the School of Civil and Environmental Engineering at the Georgia Institute of Technology, with Westinghouse Corporation as the industrial partner. The primary objective of this project was to develop self-consolidating concrete (also termed “self-compacting concrete” or SCC) mixtures so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed and validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The SCC mixtures developed were able to carry shearing forces across the cold-joint boundaries. This “self-roughening” was achieved by adding a tailored fraction of lightweight aggregate (LWA) to the concrete mix, some of which raised to the surface during curing, forming a rough surface on which subsequent concrete placements were made. The self-roughening behavior was validated through three sets of structural tests. Shear friction on small-scale specimens with cold joints was assessed using varying fractions of LWA and with varying amounts of external steel plate reinforcement. The results show that the shear friction coefficient, to be used with the provisions of ACI 318-14, Section 22.9, can be taken as 1.35. Mid-scale beam tests were completed to assess the cold-joint capacity in both in-plane and out-of-plane bending. The results showed that the self-roughened joints performed as well as monolithic joints. The final assessment was a full-scale test using a steel composite module supplied by Westinghouse and similar in construction to

  16. Final Report: Self-Consolidating Concrete Construction for Modular Units

    International Nuclear Information System (INIS)

    Gentry, Russell; Kahn, Lawrence; Kurtis, Kimberly; Petrovic, Bojan; Loreto, Giovanni; Van Wyk, Jurie; Canterero-Leal, Carlos

    2016-01-01

    This report focuses on work completed on DE-NE0000667, Self-Consolidating Concrete for Modular Units, in connection with the Department of Energy Nuclear Energy Enabling Technologies (DOE-NEET) program. This project was completed in the School of Civil and Environmental Engineering at the Georgia Institute of Technology, with Westinghouse Corporation as the industrial partner. The primary objective of this project was to develop self-consolidating concrete (also termed ''self-compacting concrete'' or SCC) mixtures so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed and validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The SCC mixtures developed were able to carry shearing forces across the cold-joint boundaries. This ''self-roughening'' was achieved by adding a tailored fraction of lightweight aggregate (LWA) to the concrete mix, some of which raised to the surface during curing, forming a rough surface on which subsequent concrete placements were made. The self-roughening behavior was validated through three sets of structural tests. Shear friction on small-scale specimens with cold joints was assessed using varying fractions of LWA and with varying amounts of external steel plate reinforcement. The results show that the shear friction coefficient, to be used with the provisions of ACI 318-14, Section 22.9, can be taken as 1.35. Mid-scale beam tests were completed to assess the cold-joint capacity in both in-plane and out-of-plane bending. The results showed that the self-roughened joints performed as well as monolithic joints. The final assessment was a full-scale test using a steel composite module supplied by

  17. Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem

    2015-02-01

    Full Text Available This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects. Meanwhile, the research has determined the percentage of project items, in such a remote environment. Estimation equations suitable for remote areas have been formulated. Moreover, a procedure for unite price calculation is concluded.

  18. Final Report: Self Consolidating Concrete Construction for Modular Units

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, Russell [Georgia Inst. of Technology, Atlanta, GA (United States); Kahn, Lawrence [Georgia Inst. of Technology, Atlanta, GA (United States); Kurtis, Kimberly [Georgia Inst. of Technology, Atlanta, GA (United States); Petrovic, Bojan [Georgia Inst. of Technology, Atlanta, GA (United States); Loreto, Giovanni [Georgia Inst. of Technology, Atlanta, GA (United States); Van Wyk, Jurie [Westinghouse Electric Company, Cranberry Township, PA (United States); Canterero-Leal, Carlos [Westinghouse Electric Company, Cranberry Township, PA (United States)

    2016-07-29

    This report outlines the development of a self-consolidating concrete (also termed “self-compacting concrete” or SCC) so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed and validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The self-roughening concrete produced as part of this research was assessed in SC structures at three scales: small-scale shear-friction specimens, mid-scale beams tested in in-plane and out-of-plane bending, and a full-scale validation test using an SC module produced by Westinghouse as part of the Plant Vogtle expansion. The experiments show that the self-roughening concrete can produce a cold-joint surface of 0.25 inches (6 mm) without external vibration during concrete placement. The experiments and subsequent analysis show that the shear friction provisions of ACI 318-14, Section 22.9 can be used to assess the shear capacity of the cold-joints in SC modular construction, and that friction coefficient of 1.35 is appropriate for use with these provisions.

  19. Predictable grammatical constructions

    DEFF Research Database (Denmark)

    Lucas, Sandra

    2015-01-01

    My aim in this paper is to provide evidence from diachronic linguistics for the view that some predictable units are entrenched in grammar and consequently in human cognition, in a way that makes them functionally and structurally equal to nonpredictable grammatical units, suggesting that these p......My aim in this paper is to provide evidence from diachronic linguistics for the view that some predictable units are entrenched in grammar and consequently in human cognition, in a way that makes them functionally and structurally equal to nonpredictable grammatical units, suggesting...... that these predictable units should be considered grammatical constructions on a par with the nonpredictable constructions. Frequency has usually been seen as the only possible argument speaking in favor of viewing some formally and semantically fully predictable units as grammatical constructions. However, this paper...... semantically and formally predictable. Despite this difference, [méllo INF], like the other future periphrases, seems to be highly entrenched in the cognition (and grammar) of Early Medieval Greek language users, and consequently a grammatical construction. The syntactic evidence speaking in favor of [méllo...

  20. HYDRAULIC UNITS FOR DRIVING SYSTEMS OF RUNNING EQUIPMENT IN ROAD CONSTRUCTION MACHINERY

    Directory of Open Access Journals (Sweden)

    A. Ja. Kotlobai

    2016-01-01

    Full Text Available Operational efficiency of multi-functional road construction machines depends on number of working bodies which are simultaneously performing technological operations. Systems for propulsion pto to the running equipment drive and active working bodies of road construction machines are developing in the way of using three-axis hydraulic drives. When designing a hydraulic system for road construction machinery dividing of power flow from propulsion to the running equipment drive and active working bodies is considered as rather essential problem. Leading companies do not pay attention to the development of flow divider designs, preferring to produce more expensive multi-flow pumps. One of the ways to increase efficiency of multi-functional road construction machinery is an implementation of running equipment hydraulic driving system based on a mono-aggregate pump unit which consists of a pump and a volumetric divider of power fluid flow. A principle of volumetric division and summing-up of power fluid flows, technical realization and methodology for calculation of key parameters of discrete flow distributors has been developed on the basis of discrete hydraulics regulations. The paper presents results of mathematical modeling of hydraulic systems equipped with the discrete flow distributor. Analysis of a dual-motor hydraulic drive operation has shown the following results: a discrete flow distributor ensures independent load mode of the current consumer circuit operation from the load mode of the second consumer circuit within a wide range of loads; rational value of working fluid flow discretization parameter is the following value interval k = 4–6, maximum value of parameter efficiency is reached when an angular velocity of a distributor rotor coincides with the angular velocity of a pump shaft; discrete flow distributor provides a possibility to change parameters of hydraulic flow feeding in consumers’ pressure lines within a wide range

  1. Wood and Other Materials Used to Construct Nonresidential Buildings in the United States 2011

    Science.gov (United States)

    Craig Adair; David B. McKeever; Chris Gaston; Margaret. Stewart

    2013-01-01

    The construction of low-rise nonresidential buildings is an important market for lumber, engineered wood products, and structural and nonstructural wood panels in the United States. This report examines low-rise nonresidential buildings of six or fewer stories. Those with more than six stories are normally severely restricted by building codes from being wood framed....

  2. Perspectives for utilization of the experience from the electrical equipment modernization of Kozloduy NPP units 5 and 6 in case of construction of new NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2005-01-01

    In 2005 a governmental decision for continue the project for construction of Belene NPP was adopted. In case of start of this significant project in short terms, a good option will be to utilize the already achieved experience by the modernization program of units 5 and 6 of Kozloduy NPP. The process of construction of new NPP is associated with significant amount of engineering, civil construction works, equipment order and delivery, installation works, testing and commissioning activities. It is vital necessity to have optimal technology, strict organization for project implementation and excellent documentation. From technical point of view the experience from the modernization of units 5 and 6 of Kozloduy NPP will be very important in case of utilization of similar types of WWER 1000 units. According to the 'Feasibility study for construction of Belene NPP', the most favorable option is to accomplish the already partially constructed Unit 1 on the basis of upgraded WWER B-320 design - WWER 1000 B-392, in order to fulfill IEC 331-3A, IEC 332-3A, and of US NRC Regulatory Guide 1.70 and to construct the second unit on the basis of ASE WWER/1000 B-466. However, for any type of unit selected, the achieved experience will be an important basis. This article is focused mostly on the modernization aspects of some electrical systems of Kozloduy NPP

  3. Wood Products Other Building Materials Used in New Residential Construction in the United States

    Science.gov (United States)

    David B. McKeever; Joe Elling

    2015-01-01

    On average, new residential construction accounts for about one-third of all wood products consumed in the United States annually. During periods of robust housing activity, 45% or more of all wood products consumed are for new single-family and multifamily housing. This can fall to as low as 20% or less during times of economic recession. Unfortunately, 2012 was not...

  4. Nuclear power plant construction activity, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors

  5. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    International Nuclear Information System (INIS)

    1975-01-01

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  6. Wood products used in constructing conservation and development projects by the Corps of Engineers in the United States, 1962 and 1978

    Science.gov (United States)

    W. H. Reid; D. B. McKeever

    Estimates of the amounts of wood products used in constructing civil conservation and development projects by the Corps of Engineers in the United States are presented for the years 1962 and 1978. Amounts of lumber, laminated lumber, poles and piling, and plywood used in construction are stratified by five construction categories, and three types of uses. Estimates of...

  7. Lewis pressurized, fluidized-bed combustion program. Data and calculated results

    Science.gov (United States)

    Rollbuhler, R. J.

    1982-03-01

    A 200 kilowatt (thermal), pressurized, fluidized bed (PFB) reactor and research test facility were designed, constructed, and operated. The facility was established to assess and evaluate the effect of PFB hot gas effluent on aircraft turbine engine materials that may have applications in stationary powerplant turbogenerators. The facility was intended for research and development work and was designed to operate over a wide range of conditions. These conditions included the type and rate of consumption of fuel (e.g., coal) and sulfur reacting sorbent material: the ratio of feed fuel to sorbent material; the ratio of feed fuel to combustion airflow; the depth of the fluidized reaction bed; the temperature and pressure in the reaction bed; and the type of test unit that was exposed to the combustion exhaust gases.

  8. Cooling tower, construction method method therefor and precast prestressed concrete building units

    International Nuclear Information System (INIS)

    Lin, T.Y.; Yang, Y.C.

    1978-01-01

    A large, thin-shell cooling tower, a method for its erection, and novel precast units are described. Upon a foundation a series of angularly-extending columns is erected, and the columns are joined at their upper ends by a lower ring. Then a ribbed, waffle-like reinforced concrete wall is constructed to extend up from the lower ring and to provide a shell with a shape such as a hyperbolic paraboloid. The ribbed outer (or inner) surface strengthens the structure while enabling the thickness of the portions in between the ribs to be relatively thin. A series of vertically-spaced horizontal circumferential reinforcing bars or post-tensioning cables and a series of horizontally-spaced vertical or inclined bars or cables are included in the wall. The wall is preferably made up from a series of precast units that are of novel structure in themselves. At the top of the wall is an upper ring joining the various elements together

  9. Evolution of the constructive adobe system in the Porcelain Industrial Unit of Vista Alegre (1937-1945

    Directory of Open Access Journals (Sweden)

    Alice Ruano

    2010-01-01

    Full Text Available The urban nucleus of the Porcelain Factory of Vista Alegre reveals a special interest in terms of the evolution of the traditional adobe construction in the town of Ílhavo, located in the district of Aveiro. Presenting a structured philosophy of intervention in the territory since its very beginning, it possesses a rich heritage in the field of construction and architecture. The measures planned and implemented in the second phase of Vista Alegre growth reporting its beginning to the ends of the 30's, and along the 40's, confirm it both in the rehabilitation, extension and new constructions in adobe masonry. Those measures were implemented during the structural changes of the Industrial Unit administration that only until this period belonged to the family of its founder. These changes creates one of the focus of innovation in the region, with new construction strategies and solutions in adobe buildings, which will prolonged the period of use of this construction system, noticeable in buildings dated of 1958 in the Vista Alegre and at least in 1970 in the town.

  10. Construction and psychometric testing of the EMPATHIC questionnaire measuring parent satisfaction in the pediatric intensive care unit

    NARCIS (Netherlands)

    Latour, Jos M.; van Goudoever, Johannes B.; Duivenvoorden, Hugo J.; Albers, Marcel J. I. J.; van Dam, Nicolette A. M.; Dullaart, Eugenie; van Heerde, Marc; de Neef, Marjorie; Verlaat, Carin W. M.; van Vught, Elise M.; Hazelzet, Jan A.

    To construct and test the reliability and validity of the EMpowerment of PArents in THe Intensive Care (EMPATHIC) questionnaire measuring parent satisfaction in the pediatric intensive care unit (PICU). Structured development and psychometric testing of a parent satisfaction-with-care instrument

  11. Construction and psychometric testing of the EMPATHIC questionnaire measuring parent satisfaction in the pediatric intensive care unit

    NARCIS (Netherlands)

    Latour, J.M.; van Goudoever, J.B.; Duivenvoorden, H.J.; Albers, M.J.I.J.; van Dam, N.A.M.; Dullaart, E.; van Heerde, M.; de Neef, M.; Verlaat, C.W.M.; van Vught, E.M.; Hazelzet, J.A.

    2011-01-01

    To construct and test the reliability and validity of the EMpowerment of PArents in THe Intensive Care (EMPATHIC) questionnaire measuring parent satisfaction in the pediatric intensive care unit (PICU). Structured development and psychometric testing of a parent satisfaction-with-care instrument

  12. The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam

    Science.gov (United States)

    Tripoli; Mubarak; Nurisra; Mahmuddin

    2018-05-01

    This paper discusses the implementation of Indonesian National Standard (SNI) 7394: 2008 on procedures for calculating the unit price of concrete work for the construction of building and housing. The standard provides some reinforced concrete constructions unit price (UP) analysis by specified the total number of reinforcing uses. Related to reinforced concrete beam work (Analysis No. 6.31), the reinforcement requirement is stated at 200 kg/m3 of concrete. Once the implementation considers various earthquake zoning, the question will arise about the extent to which the standard is feasible to apply. Therefore, this research aimed to analyze the possibility of UP standard implementation by certain earthquake zonation. This research is focused on the construction of reinforced concrete beam for buildings with function as educational, residential and office buildings. The data used are sourced from 21 buildings in two zones in Aceh Province, covering Zone 10 and Zone 15 based on earthquake map of SNI 1726: 2012. The analysis results indicate that the UP standard for reinforced concrete beam cannot be applied to all zoning. The UP standard is only possible on buildings constructed in Zone 10 or zonation with seismic spectral response 0.6g to 0.7g or lower.

  13. Radioactive air emissions notice of construction portable/temporary radioactive air emission units - August 1998

    International Nuclear Information System (INIS)

    FRITZ, D.W.

    1999-01-01

    This notice of construction (NOC) requests a categorical approval for construction and operation of three types of portable/temporary radionuclide airborne emission units (PTRAEUs). These three types are portable ventilation-filter systems (Type I), mobile sample preparation facilities (Type II), and mobile sample screening and analysis facilities (Type III). Approval of the NOC application is intended to allow construction and operation of the three types of PTRAEUs without prior project-specific approval. Environmental cleanup efforts on the Hanford Site often require the use of PTRAEUs. The PTRAEUs support site characterization activities, expedited response actions (ERAs), sampling and monitoring activities, and other routine activities. The PTRAEUs operate at various locations around the Hanford Site. Radiation Air Emissions Program, Washington Administrative Code (WAC) 246-247, requires that the Washington State Department of Health (WDOH) be notified before construction of any new emission that would release airborne radioactivity. The WDOH also must receive notification before any modification of an existing source. This includes changes in the source term or replacement of emission control equipment that might significantly contribute to the offsite maximum dose from a licensed facility. During site characterization activities, ERAs, sampling and monitoring activities, and other routine activities, the PTRAEUs might require startup immediately. The notification period hampers efforts to complete such activities in an effective and timely manner. Additionally, notification is to be submitted to the WDOH when the PTRAEUs are turned off. The U.S. Department of Energy, Richland Operations Office (DOE-RL) potentially could generate several notifications monthly. The WDOH would be required to review and provide approval on each NOC as well as review the notices of discontinued sources. The WDOH regulation also allows facilities the opportunity to request a

  14. The French electromechanical industry in the nuclear sector

    International Nuclear Information System (INIS)

    Barrau, M. de.

    1981-02-01

    A brief paper recounting the extensive changes brought about in electromechanics further to the implementation of the large French nuclear programme and the experience that its implementation has given to this industry, in particular at ALSTHOM-ATLANTIQUE, the only French manufacturer of high power turbo-generating units rated among the big world manufacturers [fr

  15. Construction history and construction management

    International Nuclear Information System (INIS)

    Agh, S.

    1999-01-01

    The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)

  16. Wood and Other Materials Used to Construct Nonresidential Buildings in the United States 2011 Executive Summary

    Science.gov (United States)

    David B. McKeever

    2013-01-01

    The construction of low-rise nonresidential buildings is an important market for lumber, engineered wood products, and structural and nonstructural wood panels in the United States. This report examines low-rise nonresidential buildings of six or fewer stories. Those with more than six stories are normally severely restricted by building codes from being wood framed....

  17. THE EVOLUTION OF THE DESIGN AND CONSTRUCTION OF MASONRY BUILDINGS IN THE UNITED STATES

    OpenAIRE

    Richard E. Klingner

    2012-01-01

    In this paper, the process used to develop building codes in the United States of America (USA) is summarized, with emphasis on masonry. Masonry materials used in the USA are discussed. Types of masonry construction in the USA are reviewed, addressing historical as well as modern masonry. Current non-structural and structural applications of masonry in the USA are reviewed. Historical development of masonry codes in the USA is summarized, with emphasis on the current Masonry Standards Joi...

  18. Construction of Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Yamanari, Shozo; Miyahara, Ryohei; Umezawa, Takeshi; Teshiba, Ichiro

    2006-01-01

    Construction of the Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc. (advanced boiling-water reactor; output: 1.358 mega watts) was begun in August 1999 and it will resume commercial operation in March 2006 as scheduled. Hitachi contributed effectually toward realizing the project with supply of a complete set of the advanced nuclear reactor and turbine-generator system with the latest design and construction technology in harmony. Large-scale modular structures for installation and a computer-aided engineering system for work procedure and schedule management were applied with the utmost priority placed on work efficiency, safety and quality assurance. (T.Tanaka)

  19. Radioactive air emissions notice of construction portable temporary radioactive air emission units - August 1998; FINAL

    International Nuclear Information System (INIS)

    FRITZ, D.W.

    1999-01-01

    This notice of construction (NOC) requests a categorical approval for construction and operation of three types of portable/temporary radionuclide airborne emission units (PTRAEUs). These three types are portable ventilation-filter systems (Type I), mobile sample preparation facilities (Type II), and mobile sample screening and analysis facilities (Type 111). Approval of the NOC application is intended to allow construction and operation of the three types of PTRAEUs without prior project-specific approval. Environmental cleanup efforts on the Hanford Site often require the use of PTRAEUs. The PTRAEUs support site characterization activities, expedited response actions (ERAs), sampling and monitoring activities, and other routine activities. The PTRAEUs operate at various locations around the Hanford Site. Radiation Air Emissions Program, Washington Administrative Code (WAC) 246-247, requires that the Washington State Department of Health (WDOH) be notified before construction of any new emission that would release airborne radioactivity. The WDOH also must receive notification before any modification of an existing source. This includes changes in the source term or replacement of emission control equipment that might significantly contribute to the offsite maximum dose from a licensed facility. During site characterization activities, ERAs, sampling and monitoring activities, and other routine activities, the PTRAEUs might require startup immediately. The notification period hampers efforts to complete such activities in an effective and timely manner. Additionally, notification is to be submitted to the WDOH when the PTRAEUs are turned off. The U.S. Department of Energy, Richland Operations Office (DOE-RL) potentially could generate several notifications monthly. The WDOH would be required to review and provide approval on each NOC as well as review the notices of discontinued sources. The WDOH regulation also allows facilities the opportunity to request a

  20. ABWR construction experience in Japan

    International Nuclear Information System (INIS)

    Kawahata, Junichi; Miura, Jun; Saito, Fuyuki; Mori, Hiroya

    2003-01-01

    The construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and 7 (K6 and 7) owned by Tokyo Electric Power Company (TEPCO), have been in service since November 1996 and September 1997 respectively, and are the first ABWRs in the world. Hitachi, Ltd. and Toshiba Corporation took part in the projects and achieved safety construction in 52- month schedule from rock inspection to turnover in cooperation with TEPCO and other contractors with broad experience in BWRs. Taking advantage of experience of the Kashiwazaki construction, the ABWR construction methods realize to satisfy with requests from electric power companies and to fit site conditions. The Chubu Electric Power Company's Hamaoka Nuclear Power Station Unit No. 5 (Hamaoka 5) and Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2), which are ABWRs, completed rock inspection in May 2000 and June 2001 respectively, and are under construction. The ABWR construction methods are proved their validity through four actual construction projects. Safe constructions with the highest quality have been advanced thus further aiming at the introduction of the latest technologies and contributing to reduce plant construction costs and also to shorten schedule. (author)

  1. Modeling end-of-life pathways of construction and demolition debris in the United States (poster for LCM 2017)

    Science.gov (United States)

    In 2013, the United States generated 530 million tons of construction and demolition debris (CDD), 90% of which was related to demolition. Despite this major contribution to national waste streams, Life Cycle Assessment (LCA) studies and product declarations of buildings and buil...

  2. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    This paper discusses the three different types of productivity programs used at the Wm. H. Zimmer Nuclear Power Station construction site. The Standard Cost Estimate as Productivity Measurement compares actual units installed to estimated units. The Manpower and Equipment Utilization Study measures the present utilization level of the construction work force, identifies opportunities for productivity improvement, and establishes a data base against which future improvements could be made. The special productivity program is a specialized and detailed study of first line supervision. Productivity is defined as the degree of efficiency attained in the use of labor, professional and management skills and knowledge, materials and equipment, and time and money to produce an end result. It is concluded that a more consistent system of productivity measurements needs to be developed and promoted for general use in the construction industry

  3. Failure analysis to the weights of balance of a 350 MW turbo-generator; Analisis de falla a los pesos de balanceo de un turbogenerador de 350 MW

    Energy Technology Data Exchange (ETDEWEB)

    Vital Flores, Francisco; Gamero Arroyo, Jose Manuel [LAPEM, Comision Federal de Electricidad (Mexico)

    2007-11-15

    The selection of materials and the quality control in the supply of the components, as well as the involved operative variables in the process of work to which an equipment, device or a system of a power station of electrical generation are subjected, impact in the same in their useful life in a decisive way. In this document it is presented an analysis of a failure occurred in a 350 MW turbo-generator by the loosening of the balance weights, in which it is mentioned the flaws occurred by this cause and a metallographic analysis that indicates the main fault for the happening. [Spanish] La seleccion de material y el control de calidad en los suministros de los componentes, asi como las variables operativas involucradas en el proceso de trabajo al cual es sometido un equipo, dispositivo o un sistema de una central de generacion electrica, impactan en los mismos de manera decisiva en su vida util. En este documento se presenta un analisis de falla ocurrido en un turbogenerador de 350 MW, por el desprendimiento de los pesos de balanceo, el cual se menciona de los desperfectos ocurridos por esta causa y un analisis metalografico que indica la falla principal por lo ocurrido.

  4. Construction safety

    CERN Document Server

    Li, Rita Yi Man

    2013-01-01

    A close-to-ideal blend of suburb and city, speedy construction of towers of Babylon, the sparkling proportion of glass and steel buildings’ facade at night showcase the wisdom of humans. They also witness the footsteps, sweats and tears of architects and engineers. Unfortunately, these signatures of human civilizations are swathed in towering figures of construction accidents. Fretting about these on sites, different countries adopt different measures on sites. This book firstly sketches the construction accidents on sites, followed by a review on safety measures in some of the developing countries such as Bermuda, Egypt, Kuwait and China; as well as developed countries, for example, the United States, France and Singapore. It also highlights the enormous compensation costs with the courts’ experiences in the United Kingdom and Hong Kong.

  5. SparsePak: A Formatted Fiber Field Unit for the WIYN Telescope Bench Spectrograph. I. Design, Construction, and Calibration

    NARCIS (Netherlands)

    Bershady, Matthew A.; Andersen, David R.; Harker, Justin; Ramsey, Larry W.; Verheijen, Marc A. W.

    2004-01-01

    We describe the design and construction of a formatted fiber field unit, SparsePak, and characterize its optical and astrometric performance. This array is optimized for spectroscopy of low surface brightness extended sources in the visible and near-infrared. SparsePak contains 82, 4.7" fibers

  6. The modernization potential of gas turbines in the coal-fired power industry thermal and economic effectiveness

    CERN Document Server

    Bartnik, Ryszard

    2013-01-01

    The opportunity of repowering the existing condensing power stations by means of  gas turbogenerators offers an important opportunity to considerably improvement of their energy efficiency. The Modernization Potential of Gas turbines in the Coal-Fired Power Industry presents the methodology, calculation procedures and tools used to support enterprise planning for adapting power stations to dual-fuel gas-steam combined-cycle technologies. Both the conceptual and practical aspects of the conversion of existing coal-fired power plants is covered. Discussions of the feasibility, advantages and disadvantages and possible methods are supported by chapters presenting equations of energy efficiency for the conditions of repowering a power unit by installing a gas turbogenerator in a parallel system and the results of technical calculations involving the selection heating structures of heat recovery steam generators. A methodology for analyzing thermodynamic and economic effectiveness for the selection of a structure...

  7. Second unit scheduling concerns on a dual-unit nuclear project

    International Nuclear Information System (INIS)

    Block, H.R.; Mazzini, R.A.

    1978-01-01

    This paper explores the planning and scheduling problems of Unit 2 of the Susquehanna steam electric station. The causes of these problems and methods to avoid or mitigate their consequences are discussed. The Susquehanna steam electric station has two boiling water reactors rated at 1,100 MW each. Topics considered include cost factors, structures, equipment, engineering and home office, construction services, completion data phasing, work sequencing, structural dependences, and segregation. Substatial cost and schedule benefits can result if two nuclear units are designed and constructed as one integral station, and if maximum sharing of facilities and services between the units occurs. It is concluded that the cost benefits of highly integrated dual unit construction outweigh the schedule and logistical problems caused by that approach

  8. Comparative empirical analysis of temporal relationships between construction investment and economic growth in the United States

    Directory of Open Access Journals (Sweden)

    Navid Ahmadi

    2017-09-01

    Full Text Available The majority of policymakers believe that investments in construction infrastructure would boost the economy of the United States (U.S.. They also assume that construction investment in infrastructure has similar impact on the economies of different U.S. states. In contrast, there have been studies showing the negative impact of construction activities on the economy. However, there has not been any research attempt to empirically test the temporal relationships between construction investment and economic growth in the U.S. states, to determine the longitudinal impact of construction investment on the economy of each state. The objective of this study is to investigate whether Construction Value Added (CVA is the leading (or lagging indicator of real Gross Domestic Product (real GDP for every individual state of the U.S. using empirical time series tests. The results of Granger causality tests showed that CVA is a leading indicator of state real GDP in 18 states and the District of Columbia; real GDP is a leading indicator of CVA in 10 states and the District of Columbia. There is a bidirectional relationship between CVA and real GDP in 5 states and the District of Columbia. In 8 states and the District of Columbia, not only do CVA and real GDP have leading/lagging relationships, but they are also cointegrated. These results highlight the important role of the construction industry in these states. The results also show that leading (or lagging lengths vary for different states. The results of the comparative empirical analysis reject the hypothesis that CVA is a leading indicator of real GDP in the states with the highest shares of construction in the real GDP. The findings of this research contribute to the state of knowledge by quantifying the temporal relationships between construction investment and economic growth in the U.S. states. It is expected that the results help policymakers better understand the impact of construction investment

  9. Research on collaborative innovation mechanism of green construction supply chain based on united agency

    Science.gov (United States)

    Zhang, Min; He, Weiyi

    2018-06-01

    Under the guidance of principal-agent theory and modular theory, the collaborative innovation of green technology-based companies, design contractors and project builders based on united agency will provide direction for the development of green construction supply chain in the future. After analyzing the existing independent agencies, this paper proposes the industry-university-research bilateral collaborative innovation network architecture and modularization with the innovative function of engineering design in the context of non-standard transformation interfaces, analyzes the innovation responsibility center, and gives some countermeasures and suggestions to promote the performance of bilateral cooperative innovation network.

  10. Outdoor unit construction for an electric heat pump

    Science.gov (United States)

    Draper, R.; Lackey, R.S.

    1984-09-11

    The outdoor unit for an electric heat pump is provided with an upper portion containing propeller fan means for drawing air through the lower portion containing refrigerant coil means in the form of four discrete coils connected together in a subassembly forming a W shape, the unit being provided with four adjustable legs which are retracted in shipment, and are adjusted on site to elevate the unit to a particular height suitable for the particular location in which the unit is installed. 4 figs.

  11. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Pwer Station

    International Nuclear Information System (INIS)

    Ueyama, Koreyasu

    1982-01-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported. (Wakatsuki, Y.)

  12. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Ueyama, Koreyasu [Tokyo Electric Power Co., Inc. (Japan)

    1982-09-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported.

  13. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  14. DETECTION OF CLAMPING FORCES ON MOUNTING A CONSTRUCTION VIA NEURAL NETWORK FOR THE FINITE-ELEMENT MODEL OF COMPRESSOR-CONDENSING UNIT

    Directory of Open Access Journals (Sweden)

    S. V. Krasnovskaya

    2017-01-01

    Full Text Available The article provides a brief review of a condensing unit and problems of mathematic simulation. It examines the influence of pretension on the strain-stress state of a construction by means of finiteelement modeling. The arrangement of a set of input-output data for neural network is also considered. The article investigates a possibility to predict mounting precision via neural networks; by analogy with the above calculations it examines the option to detect clamping forces on mounting compressorcondensing unit

  15. Research on construction quality and improvement of assembly construction

    Science.gov (United States)

    Cheng, Fei

    2017-11-01

    Based on the acceleration of the urbanization process and the improvement of the quality of life of our residents, the demand for building construction has been increasing. In this context, the construction industry in order to promote the construction efficiency, quality improvement, to meet the needs of the development of the times to strengthen the new technology, the use of new technologies. At present, China’s engineering construction units in the process of carrying out the project to strengthen the use of assembly-type construction technology, which thus achieved for the traditional construction work low-level, high time-consuming issues, and promote the steady improvement of production efficiency. Based on this, this paper focuses on the analysis of the connotation of the assembly structure and analyzes the quality problems in the construction process of the construction projects and puts forward the improvement measures to promote the improvement of the building quality and the construction of the building Construction speed. Based on this, this paper analyzes the structural system and design of prefabricated building.

  16. 30 CFR 7.67 - Construction test.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Construction test. 7.67 Section 7.67 Mineral... MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Multiple-Shot Blasting Units § 7.67 Construction test. The constuction test is to be performed on the blasting unit subsequent to the output energy test of...

  17. Worldwide construction

    International Nuclear Information System (INIS)

    Williamson, M.

    1994-01-01

    The paper lists major construction projects in worldwide processing and pipelining, showing capacities, contractors, estimated costs, and time of construction. The lists are divided into refineries, petrochemical plants, sulfur recovery units, gas processing plants, pipelines, and related fuel facilities. This last classification includes cogeneration plants, coal liquefaction and gasification plants, biomass power plants, geothermal power plants, integrated coal gasification combined-cycle power plants, and a coal briquetting plant

  18. 46 CFR 108.235 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Construction. 108.235 Section 108.235 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Helicopter Facilities § 108.235 Construction. (a) Each helicopter deck must be...

  19. Closure Report for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2003-03-01

    Corrective Action Unit (CAU) 425 is located on the Tonopah Test Range, approximately 386 kilometers (240 miles) northwest of Las Vegas, Nevada. CAU 425 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and is comprised of one Corrective Action Site (CAS). CAS 09-08-001-TA09 consisted of a large pile of concrete rubble from the original Hard Target and construction debris associated with the Tornado Rocket Sled Tests. CAU 425 was closed in accordance with the FFACO and the Nevada Division of Environmental Protection-approved Streamlined Approach for Environmental Restoration Plan for CAU 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada (U.S. Department of Energy, Nevada Operations Office, 2002). CAU 425 was closed by implementing the following corrective actions: The approved corrective action for this unit was clean closure. Closure activities included: (1) Removal of all the debris from the site. (2) Weighing each load of debris leaving the job site. (3) Transporting the debris to the U.S. Air Force Construction Landfill for disposal. (4) Placing the radioactive material in a U.S. Department of Transportation approved container for proper transport and disposal. (5) Transporting the radioactive material to the Nevada Test Site for disposal. (6) Regrading the job site to its approximate original contours/elevation.

  20. Design and Construction of a Positron Emission Tomography (PET) Unit and Medical Applications with GEANT Detector Simulation Package

    Energy Technology Data Exchange (ETDEWEB)

    Karagoz, Muge [Bogazici Univ., Istanbul (Turkey)

    1998-01-01

    In order to investigate the possibility of the construction of a sample PET coincidence unit in our HEP laboratory, a setup with two face to face PMTs and two 2x8 Csi(Tl) scintillator matrices has been constructed. In this setup, 1-D projections of a pointlike 22 Na positron source at different angles have been measured. Using these projections a 2-D image has been formed. Monte Carlo studies of this setup have been implemented using the detector simulation tool in CERN program library, GEANT. Again with GEANT a sample human body is created to study the effects of proton therapy. Utilization of the simulation as a pretherapy tool is also investigated.

  1. THE EVOLUTION OF THE DESIGN AND CONSTRUCTION OF MASONRY BUILDINGS IN THE UNITED STATES

    Directory of Open Access Journals (Sweden)

    Richard E. Klingner

    2012-12-01

    Full Text Available In this paper, the process used to develop building codes in the United States of America (USA is summarized, with emphasis on masonry. Masonry materials used in the USA are discussed. Types of masonry construction in the USA are reviewed, addressing historical as well as modern masonry. Current non-structural and structural applications of masonry in the USA are reviewed. Historical development of masonry codes in the USA is summarized, with emphasis on the current Masonry Standards Joint Committee (MSJC Code and Specification. Future trends in that document are predicted. The paper closes with a list of challenges to the masonry industry, and a list of focused research topics intended to meet those challenges.

  2. Revised draft environmental statement related to construction of Atlantic Generating Station Units 1 and 2 (Docket Nos. STN 50-477 and STN 50-478)

    International Nuclear Information System (INIS)

    1976-10-01

    The proposed action is the issuance of a construction permit to Public Service Electric and Gas Company (PDE and G) for the construction of the Atlantic Generating Station (AGS), Units 1 and 2. The AGS is the first nuclear power station in the United States proposed for construction in the offshore waters on the continental shelf. The AHS will be located in the Atlantic Ocean 2.8 miles offshore of Atlantic and Ocean countries. New Jersey, 11 miles northeast of Atlantic City, and will consist of two floating nuclear power plants enclosed in a protective rubble-mound breakwater. Both plants will be identical, of standardized design, and will employ pressurized water reactors to produce up to approximately 3425 megawatts thermal (MWt) each. Steam turbine generators will use this heat to produce up to approximately 1150 megawatts of electrical power (MWe) per unit. The main condensers will be cooled by the flow of seawater drawn from within the breakwater and discharged shoreward and external to the breakwater. This statement identifies various environmental aspects and potential adverse effects associated with the construction and operation of the AGS. Based upon an approximate two-year review period which included a multidisciplined assessment of extensive survey and modeling data, these effects are considered by the staff to be of a generally acceptable nature. Breakwater construction will result in the destruction of 100 acres of benthic infauna (burrowing animals) and the development of a reef-type community on the breakwater. The production of new biomass (standing crop) by the reef community is expected to compensate for the infaunal biomass destroyed by dredging and will contribute mainly to the local sport fishery. 93 figs., 110 tabs

  3. Construction, evaluation and demonstration of mobile catalytic combustion units for destruction of methane and different odor pollutants

    Energy Technology Data Exchange (ETDEWEB)

    Jannasch, Anna-Karin [Catator AB, Lund (Sweden)

    2012-02-15

    This project reports on the construction, the evaluation and the demonstration of novel, mobile small-scale (< 100 Nm{sup 3}/h) combustion units for reduction of methane and/or different odour pollutants (e.g. hydrogen sulfide, ammonia, VOC) existing in small concentrations in process air streams. The evaluated units include a regenerative (MeshRegenOx/MRO) and a recuperative, catalytic unit (Deodoron), respectively, which both are based on Catator's proprietary wire mesh catalyst technology. The evaluation and the demonstration work have involved laboratory tests with synthetic gases and a number of field tests at plants for biogas production, water and waste treatment. The results show that: 1. In comparison to conventional thermal emission abatement systems, the wire mesh catalyst technology opens up for the construction of very compact (V=0.6 Nm, W=500 kg for 1000 Nm{sup 3}/h) and thermo-economical systems (> 95 %), which technology can easily be scaled up and integrated into existing industrial and/or process streams. 2. Catator's MRO-prototype enables for autothermal oxidation of methane, with a conversion degree of 97-98 %, from an inlet concentration of 0.2 vol% at an operation temperature of 660-700 deg, i.e. 200-300 deg less than when conventional homogenous flame combustion is applied. 3. The performance of the MRO-unit was seen to be somewhat unstable, with an oscillating conversion degree during the operation cycle. This should however be able to overcome by further optimizing the integrated catalyst package and the heat exchanger. Significant improvements in efficiency and stability are also to be expected by the scale-up due to a decreasing heat loss with an increasing capacity 4. Close to 100 % removal of different odorants, with a thermal efficiency of around 80 %, can be obtained by the use of Catator's unit Deodoron at an operation temperature of 300-400 deg. The results were verified by odor tests performed up- and downstream the

  4. Design of methodology for incremental compiler construction

    Directory of Open Access Journals (Sweden)

    Pavel Haluza

    2011-01-01

    Full Text Available The paper deals with possibilities of the incremental compiler construction. It represents the compiler construction possibilities for languages with a fixed set of lexical units and for languages with a variable set of lexical units, too. The methodology design for the incremental compiler construction is based on the known algorithms for standard compiler construction and derived for both groups of languages. Under the group of languages with a fixed set of lexical units there belong languages, where each lexical unit has its constant meaning, e.g., common programming languages. For this group of languages the paper tries to solve the problem of the incremental semantic analysis, which is based on incremental parsing. In the group of languages with a variable set of lexical units (e.g., professional typographic system TEX, it is possible to change arbitrarily the meaning of each character on the input file at any time during processing. The change takes effect immediately and its validity can be somehow limited or is given by the end of the input. For this group of languages this paper tries to solve the problem case when we use macros temporarily changing the category of arbitrary characters.

  5. Theoretical construction of the contextualized dynamics of the constant shaping of advisor professors in the teaching unit

    Directory of Open Access Journals (Sweden)

    Nirma Pérez-Pelipiche

    2016-10-01

    Full Text Available This work paper shows research results on the contextualized dynamics of the constant shaping of advisor professors in the teaching unit, taking epistemological foundations as a starting point, which substantiate their theoretical construction. A model has been displayed basing on comprehension and interpretation of this process as a whole, in which its subsystems, components, structure, relations and levels among them, prove contradictions that become evident in such process, therefore allowing to structure the dynamics of shaping professors as an instrument, earning, as a result, the transforming capability of advisor professors when practicing their skill, having the teaching unit as a scenary. In that way we used different techniques: questionnaire, interviews, observation, statistical techniques and methods: historical-logical; analysis-synthesis and systemic-structural-functional, all of those ones from the hermeneutic-dialectic focus.

  6. Development of Innovative Construction Technologies for ABWRs

    International Nuclear Information System (INIS)

    Yamashita, T.; Fukuda, T.; Masuda, N.

    2002-01-01

    This paper describes an effort by Tokyo Electric Power Company (TEPCO) to shorten the construction time in a drastic manner for the Advanced Boiling Water Reactors (ABWR), thereby aiming at reducing construction costs. First an outline of the actual construction records for the five BWR Units and the two ABWR Units at the Kashiwazaki-Kariwa site is introduced along with the construction methods employed for these units. There is a continued trend in the reduction of construction time from Unit 1 to 7 owing to a number of improvements made to these units, and in particular it is noteworthy that the drastic reduction was accomplished due to the change in reactor type from BWR to ABWR. Explained next is an on-going effort for the next ABWR and the following next generation of ABWRs to further shorten construction time. In this effort an emphasis is laid on the development of innovative construction methods by the adoption of steel plate/concrete composite structures (SC Structure), and the application of those structures even to containment vessel (so-called SCCV). This work is being conducted as part of TEPCO's research and development for the next generation ABWRs (ABWR II). Presently it is expected that the construction time from bedrock inspection to fuel loading could be shortened in a stepwise fashion to 38 and 31.5 months for the next ABWR and finally to 23 months for the next generation ABWR II, thus enabling a greatly reduced power generating cost and enhanced safety during construction. In addition to the above effort, a preliminary study has been performed concerning the application of base isolation systems to ABWR plants. From this study which is aimed at standardization, lowered cost and mitigation of engineering work, it was found that base isolation system effectively reduces seismic response and is instrumental in achieving the above-mentioned objectives. Therefore it can be said that the use of this system gives more freedom in selecting sites

  7. Final environmental statement related to construction of Skagit Nuclear Power Project Units 1 and 2: (Docket Nos. 50-522 and 50-523)

    International Nuclear Information System (INIS)

    1975-05-01

    The proposed action is the issuance of construction permits to the Pudget Sound Power and Light Company, Pacific Power and Light Company, Washington Water Power Company and the Washington Public Power Supply System, for the construction of Skagit Nuclear Power Projects Units 1 and 2 (Docket Nos. 50-522 and 50-523) in Skagit County, Washington (about 64 miles north of Seattle and 6 miles ENE of Sedro Woolley). These units are scheduled for commercial service in 1982 and 1985, respectively. Each unit will employ a boiling-water nuclear reactor with a maximum expected thermal power level of 4100 MWt, which is considered in the assessments contained in this statement. At the 3800 MWt power level initially to be licensed, the net electrical capacity of each unit will be 1288 MWe. The exhaust steam from the turbine-generators will be cooled in condensers which will utilize one hyperbolic-type natural-draft cooling tower per unit to dissipate heat to the atmosphere. Water (106 cfs max.) for the cooling tower makeup (82.4 cfs) and other plant uses will be withdrawn from the Skagit River through Ranney Collectors embedded in the north bank of the river and pumped to the plant through a pipeline about 35,000 ft. long. Cooling tower blowdown (7 cfs max.) from the project and dilution water (20 cfs max.) will flow through a pipeline back to the river where it will be discharged through a diffuser

  8. Occupational safety issues in residential construction surveyed in Wisconsin, United States.

    Science.gov (United States)

    Choi, Sang D; Carlson, Kathryn

    2014-01-01

    Residential construction is a high-risk industry in the U.S. due to the exposure to work-related safety hazards and fall injuries. This study aimed to examine the safety training and safe work practices of construction workers within the small residential construction industry. In order to achieve the study objectives, a survey was designed and sent to approximately 200 Wisconsin based residential construction contractors. About one third of the respondents stated that they did not have any form of safety programs. The study indicated that the most common types of work-related injuries in residential construction were slips/trips/falls and cuts/lacerations. The survey findings also suggested that the residential construction contractors needed to increase the utilization of fall protection safety equipment. Further education and subject matter expert training could provide benefits to improve occupational safety and health of the small business workforce in the residential construction industry.

  9. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  10. Linear units improve articulation between social and physical constructs: An example from caregiver parameterization for children supported by complex medical technologies

    Science.gov (United States)

    Bezruczko, N.; Stanley, T.; Battle, M.; Latty, C.

    2016-11-01

    Despite broad sweeping pronouncements by international research organizations that social sciences are being integrated into global research programs, little attention has been directed toward obstacles blocking productive collaborations. In particular, social sciences routinely implement nonlinear, ordinal measures, which fundamentally inhibit integration with overarching scientific paradigms. The widely promoted general linear model in contemporary social science methods is largely based on untransformed scores and ratings, which are neither objective nor linear. This issue has historically separated physical and social sciences, which this report now asserts is unnecessary. In this research, nonlinear, subjective caregiver ratings of confidence to care for children supported by complex, medical technologies were transformed to an objective scale defined by logits (N=70). Transparent linear units from this transformation provided foundational insights into measurement properties of a social- humanistic caregiving construct, which clarified physical and social caregiver implications. Parameterized items and ratings were also subjected to multivariate hierarchical analysis, then decomposed to demonstrate theoretical coherence (R2 >.50), which provided further support for convergence of mathematical parameterization, physical expectations, and a social-humanistic construct. These results present substantial support for improving integration of social sciences with contemporary scientific research programs by emphasizing construction of common variables with objective, linear units.

  11. Process for superheating the steam generated by a light water nuclear reactor

    International Nuclear Information System (INIS)

    Vakil, H.B.; Brown, D.H.

    1976-01-01

    A process is submitted for superheating the pressurised steam generated in a light water nuclear reactor in which the steam is brought to 340 0 C at least. This superheated steam is used to operate a turbo-generator unit. The characteristic of the process is that an exothermal chemical reaction is used to generate the heat utilised during the superheating stage. The chemical reaction is a mechanisation, oxidation-reduction or hydrogenation reaction [fr

  12. Construction Minerals Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes construction minerals operations in the United States. The data represent commodities covered by the Minerals Information Team (MIT) of the...

  13. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  14. 12 CFR 561.30 - Nonresidential construction loan.

    Science.gov (United States)

    2010-01-01

    ... REGULATIONS AFFECTING ALL SAVINGS ASSOCIATIONS § 561.30 Nonresidential construction loan. The term nonresidential construction loan means a loan for construction of other than one or more dwelling units. ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Nonresidential construction loan. 561.30...

  15. Construction of PREMUX and preliminary experimental results, as preparation for the HCPB breeder unit mock-up testing

    Energy Technology Data Exchange (ETDEWEB)

    Hernández, F., E-mail: francisco.hernandez@kit.edu [Karlsruhe Institute of Technology (KIT), Institute for Neutron Physics and Reactor Technology (INR) (Germany); Kolb, M. [Karlsruhe Institute of Technology (KIT), Institute for Applied Materials (IAM-WPT) (Germany); Annabattula, R. [Indian Institute of Technology Madras (IITM), Department of Mechanical Engineering (India); Weth, A. von der [Karlsruhe Institute of Technology (KIT), Institute for Neutron Physics and Reactor Technology (INR) (Germany)

    2014-10-15

    Highlights: • PREMUX has been constructed as preparation for a future out-of-pile thermo-mechanical qualification of a HCPB breeder unit mock-up. • The rationale and constructive details of PREMUX are reported in this paper. • PREMUX serves as a test rig for the new heater system developed for the HCPB-BU mock-up. • PREMUX will be used as benchmark for the thermal and thermo-mechanical models developed in ANSYS for the pebble beds of the HCPB-BU. • Preliminary results show the functionality of PREMUX and the good agreement of the measured temperatures with the thermal model developed in ANSYS. - Abstract: One of the European blanket designs for ITER is the Helium Cooled Pebble Bed (HCPB) blanket. The core of the HCPB-TBM consists of so-called breeder units (BUs), which encloses beryllium as neutron multiplier and lithium orthosilicate (Li{sub 4}SiO{sub 4}) as tritium breeder in form of pebble beds. After the design phase of the HCPB-BU, a non-nuclear thermal and thermo-mechanical qualification program for this device is running at the Karlsruhe Institute of Technology. Before the complex full scale BU testing, a pre-test mock-up experiment (PREMUX) has been constructed, which consists of a slice of the BU containing the Li{sub 4}SiO{sub 4} pebble bed. PREMUX is going to be operated under highly ITER-relevant conditions and has the following goals: (1) as a testing rig of new heater concept based on a matrix of wire heaters, (2) as benchmark for the existing finite element method (FEM) codes used for the thermo-mechanical assessment of the Li{sub 4}SiO{sub 4} pebble bed, and (3) in situ measurement of thermal conductivity of the Li{sub 4}SiO{sub 4} pebble bed during the tests. This paper describes the construction of PREMUX, its rationale and the experimental campaign planned with the device. Preliminary results testing the algorithm used for the temperature reconstruction of the pebble bed are reported and compared qualitatively with first analyses

  16. Sustainable Construction Risk Perceptions in the Kuwaiti Construction Industry

    Directory of Open Access Journals (Sweden)

    Dalya Ismael

    2018-06-01

    Full Text Available Sustainable construction is fundamentally different than traditional construction because it requires whole systems thinking, early collaboration across stakeholders, and core principles like reducing resource consumption, eliminating toxins, and applying life cycle costing. Construction professionals unfamiliar with this mindset and approach may perceive sustainable construction as risky. One of the global regions in need of more sustainable construction is the Middle Eastern and North African (MENA region. The MENA region is one of the fastest developing in the world. However, it is the slowest one in implementing sustainable construction practices. Kuwait, in particular, contributes 53% more carbon emissions per capita than the United States. To understand how the Kuwaiti construction industry perceives risks associated with more sustainable construction, a survey was developed with 52 risk elements in which 131 industry professionals responded. The results indicate that industry professionals perceive a lack of public awareness as the risk element with the highest probability of occurrence. The risk element with the highest possible negative impact on future projects is designers’ and contractors’ inexperience with sustainable construction. Other risks were found to include a high initial cost for materials and overall project costs. Educational interventions, changes in risk allocation, and behavioral science to reframe upfront costs as long-term savings are offered as possible solutions.

  17. Costs of occupational injuries in construction in the United States.

    Science.gov (United States)

    Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Haile, Elizabeth; Men, Yurong

    2007-11-01

    This paper presents costs of fatal and nonfatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and nonfatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry's total fatal and nonfatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs.

  18. The distribution of common construction materials at risk to acid deposition in the United States

    Science.gov (United States)

    Lipfert, Frederick W.; Daum, Mary L.

    Information on the geographic distribution of various types of exposed materials is required to estimate the economic costs of damage to construction materials from acid deposition. This paper focuses on the identification, evaluation and interpretation of data describing the distributions of exterior construction materials, primarily in the United States. This information could provide guidance on how data needed for future economic assessments might be acquired in the most cost-effective ways. Materials distribution surveys from 16 cities in the U.S. and Canada and five related databases from government agencies and trade organizations were examined. Data on residential buildings are more commonly available than on nonresidential buildings; little geographically resolved information on distributions of materials in infrastructure was found. Survey results generally agree with the appropriate ancillary databases, but the usefulness of the databases is often limited by their coarse spatial resolution. Information on those materials which are most sensitive to acid deposition is especially scarce. Since a comprehensive error analysis has never been performed on the data required for an economic assessment, it is not possible to specify the corresponding detailed requirements for data on the distributions of materials.

  19. MHD power plants - a reality of the 80's

    International Nuclear Information System (INIS)

    Pishchikov, S.

    1981-01-01

    A 300 MW MHD generator and a conventional turbogenerator of the same capacity will be used for the first MHD power block assembly projected in the USSR. The power plant's own consumption will not exceed 12% and the availability will be approximately 50%. Compared with a conventional power generating unit of a capacity of 500 MW the projected unit will provide fuel savings of at least 23%. The project is based on almost seven years long experience with the U-25 experimental MHD facility. Similar to the U-25, the MHD power plant projected will be fired with natural gas. (B.S.)

  20. MHD power plants - a reality of the 80's

    Energy Technology Data Exchange (ETDEWEB)

    Pishchikov, S

    1981-02-01

    A 300 MW MHD generator and a conventional turbogenerator of the same capacity will be used for the first MHD power block assembly projected in the USSR. The power plant's own consumption will not exceed 12% and the availability will be approximately 50%. Compared with a conventional power generating unit of a capacity of 500 MW the projected unit will provide fuel savings of at least 23%. The project is based on almost seven years long experience with the U-25 experimental MHD facility. Similar to the U-25, the MHD power plant projected will be fired with natural gas.

  1. Construction Safety Forecast for ITER

    Energy Technology Data Exchange (ETDEWEB)

    cadwallader, lee charles

    2006-11-01

    The International Thermonuclear Experimental Reactor (ITER) project is poised to begin its construction activity. This paper gives an estimate of construction safety as if the experiment was being built in the United States. This estimate of construction injuries and potential fatalities serves as a useful forecast of what can be expected for construction of such a major facility in any country. These data should be considered by the ITER International Team as it plans for safety during the construction phase. Based on average U.S. construction rates, ITER may expect a lost workday case rate of < 4.0 and a fatality count of 0.5 to 0.9 persons per year.

  2. Impact of modules on the ACR construction schedule

    International Nuclear Information System (INIS)

    Choy, Ed; Elgohary, Medhat; Fairclough, Neville; Yu, Stephen; Murayama, Kouichi; Miura, Jun; Kawahata, Junichi

    2003-01-01

    The ACR (Advanced CANDU Reactor), developed by Atomic Energy of Canada Ltd. (AECL), is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. For ACR-700, a project schedule of 48 months has been developed for the nth replicated unit with a 36 month construction period duration from First Concrete to Fuel Load. AECL, recognizing the immense benefit of collective experience, is partnering with Hitachi Ltd in the development of the ACR power plant design. AECL has gained valuable experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China, and Hitachi likewise has enjoyed success in modular construction of ABWRs in Japan. Utilizing these experiences, AECL is developing the ACR nuclear steam plant (NSP) and Hitachi is developing the Turbine Building. An overall construction strategy, which builds on the success of these construction methods from the nuclear power plant developments in China and Japan, has been developed for the ACR. The overall construction strategy comprises the 'Open Top' construction technique using a Very Heavy Lift crane, parallel construction activities, with extensive modularization and prefabrication. Modules and prefabrications are major features of the ACR design, resulting in an excess of 80% of Reactor Building internal work being completed as modules or as very streamlined traditional construction. This paper reviews the ACR construction strategy and provides examples of modules and how they impact on the ACR construction schedule. In conclusion, the ACR-700 is designed using the latest, proven construction methods to achieve a 36 month construction period for the nth replicated unit. (author)

  3. United States housing, first quarter 2013

    Science.gov (United States)

    Delton Alderman

    2014-01-01

    Provides current and historical information on housing market in the United States. Information includes trends for housing permits and starts, housing under construction, and housing completions for single and multifamily units, and sales and construction. This report will be updated regularly.

  4. 32 CFR 751.4 - Construction.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Construction. 751.4 Section 751.4 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY CLAIMS PERSONNEL CLAIMS REGULATIONS Claims Against the United States § 751.4 Construction. The provisions of this section and the Personnel...

  5. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  6. Application and Mechanics Analysis of Multi-Function Construction Platforms in Prefabricated-Concrete Construction

    Science.gov (United States)

    Wang, Meihua; Li, Rongshuai; Zhang, Wenze

    2017-11-01

    Multi-function construction platforms (MCPs) as an “old construction technology, new application” of the building facade construction equipment, its efforts to reduce labour intensity, improve labour productivity, ensure construction safety, shorten the duration of construction and other aspects of the effect are significant. In this study, the functional analysis of the multi-function construction platforms is carried out in the construction of the assembly building. Based on the general finite element software ANSYS, the static calculation and dynamic characteristics analysis of the MCPs structure are analysed, the simplified finite element model is constructed, and the selection of the unit, the processing and solution of boundary are under discussion and research. The maximum deformation value, the maximum stress value and the structural dynamic characteristic model are obtained. The dangerous parts of the platform structure are analysed, too. Multiple types of MCPs under engineering construction conditions are calculated, so as to put forward the rationalization suggestions for engineering application of the MCPs.

  7. Multi-Unit Aspects of the Pickering Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Morison, W. G. [Atomic Energy of Canada Ltd, Sheridan Park, ON (Canada)

    1968-04-15

    The Pickering nuclear generating station is located on the north shore of Lake Ontario, about 20 miles east of the city of Toronto, Canada. The station has been planned and laid out on an eight-unit station, four units of which have now been authorized for construction. Each of these four units consists of a single heavy-water moderated and cooled CANDU-type reactor and auxiliaries coupled to a single tandem compound turbine generator with a net output of approximately 500 MW(e). The units are identical and are scheduled to come into operation at intervals of one year from 1970 to 1973. The station has been planned with central facilities for: administration maintenance laboratories, stores, change rooms, decontamination and waste management services. A common control centre, cooling water intake and discharge system, and spent fuel storage bay for four units has been arranged. A feature of the multi-unit station is a common containment system. Cost savings in building a number of identical units on the same site result from a single exclusion area, shared engineering costs, equipment purchase contracts for four identical components, and efficient use of construction plant. Operating cost savings are anticipated in the use of a common operating and maintenance staff and spare parts inventory. The plant has been arranged to minimize problems of operating, commissioning and constructing units at the same time on the same site. The layout and construction sequence have been arranged so that the first unit can be commissioned and operated with little or no interference from the construction forces working on succeeding units. During the construction phase barriers will be erected in the common control centre between operating control equipment and that being installed. Operations and construction personnel will enter the plant by separate routes and work in areas separated by physical barriers. (author)

  8. Development of a PI fuzzy-neural control of two freedom degrees, applied to the velocity control of a turbo-gas unit; Desarrollo de un control PI neurodifuso no lineal de dos grados de libertad, aplicado al control de velocidad de una unidad turbogas

    Energy Technology Data Exchange (ETDEWEB)

    Castelo C, Luis; Garduno R, Raul [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Marmol M, Enrique Q [Cento Nacional de Investigacion y Desarrollo Tecnologico (Cenidet), Cuernavaca, Morelos (Mexico)

    2005-07-01

    The Instituto de Investigaciones Electricas has developed and implemented control systems in power stations with turbo gas unit (TGU) and of combined cycle power plants in which it has been detected several necessities and opportunities of technological development. One of most important is the improvement of the strategies of velocity control, power and temperature of the TGU, in order to obtain a safer and profitable operation. Since these units demand a strict and greater number of control requirements, because they are characterized by operating at temperatures, pressures and velocities higher than those of another type of units. An alternative to improve the control strategies of the TGU is the use of other control structures and the use of control techniques with diffuse logic, which can surpass the disadvantages of the conventional control. Due to the former, the reliability requirements of the TGU to get on line without fault, when required, have remarkably increased. The frequent accomplishment of starts, synchronization, load takings and shut-downs in a successful way and in automatic form, strongly depend on the capacities of the control system. During the starting, the main task of the control system consists of accelerating to the turbo-generator from the turn-shaft velocity to the nominal velocity according to a predefined acceleration pattern. The velocity control generates the control actions to accelerate the turbo-generator in a safe way that avoids the occurrence of instabilities of the working fluid, vibration discharges and resonances, high temperatures and combustion instabilities, and in addition, in the minimum of time, with fuel saving and preserving the useful life of the turbo-generator. [Spanish] El Instituto de Investigaciones Electricas ha desarrollado e implantado sistemas de control en centrales con unidad turbo gas (UTG) y centrales de ciclo combinado en las que se ha detectado varias necesidades y oportunidades de desarrollo

  9. Enhancing Teaching through Constructive Alignment.

    Science.gov (United States)

    Biggs, John

    1996-01-01

    An approach to college-level instructional design that incorporates the principles of constructivism, termed "constructive alignment," is described. The process is then illustrated with reference to a professional development unit in educational psychology for teachers, but the model is viewed as generalizable to most units or programs in higher…

  10. Design and construction of coal/biomass to liquids (CBTL) process development unit (PDU) at the University of Kentucky Center for Applied Energy Research (CAER)

    Energy Technology Data Exchange (ETDEWEB)

    Placido, Andrew [Univ. of Kentucky, Lexington, KY (United States); Liu, Kunlei [Univ. of Kentucky, Lexington, KY (United States); Challman, Don [Univ. of Kentucky, Lexington, KY (United States); Andrews, Rodney [Univ. of Kentucky, Lexington, KY (United States); Jacques, David [Univ. of Kentucky, Lexington, KY (United States)

    2015-10-30

    This report describes a first phase of a project to design, construct and commission an integrated coal/biomass-to-liquids facility at a capacity of 1 bbl. /day at the University of Kentucky Center for Applied Energy Research (UK-CAER) – specifically for construction of the building and upstream process units for feed handling, gasification, and gas cleaning, conditioning and compression. The deliverables from the operation of this pilot plant [when fully equipped with the downstream process units] will be firstly the liquid FT products and finished fuels which are of interest to UK-CAER’s academic, government and industrial research partners. The facility will produce research quantities of FT liquids and finished fuels for subsequent Fuel Quality Testing, Performance and Acceptability. Moreover, the facility is expected to be employed for a range of research and investigations related to: Feed Preparation, Characteristics and Quality; Coal and Biomass Gasification; Gas Clean-up/ Conditioning; Gas Conversion by FT Synthesis; Product Work-up and Refining; Systems Analysis and Integration; and Scale-up and Demonstration. Environmental Considerations - particularly how to manage and reduce carbon dioxide emissions from CBTL facilities and from use of the fuels - will be a primary research objectives. Such a facility has required significant lead time for environmental review, architectural/building construction, and EPC services. UK, with DOE support, has advanced the facility in several important ways. These include: a formal EA/FONSI, and permits and approvals; construction of a building; selection of a range of technologies and vendors; and completion of the upstream process units. The results of this project are the FEED and detailed engineering studies, the alternate configurations and the as-built plant - its equipment and capabilities for future research and demonstration and its adaptability for re-purposing to meet other needs. These are described in

  11. Colonial Era Impoundment of the Northeastern United States: Beaver Trapping and Low- head Dam Construction

    Science.gov (United States)

    Salant, N.; Bain, D.; Brandt, S.

    2008-12-01

    Hydrologic systems of the northeastern United States were transformed by European settler activities. The colonial economy shifted engineered water structures from beaver dams to human dams built for power generation. While the geomorphic effects of human-constructed dams have recently garnered considerable attention, few studies have investigated how intensive trapping for the fur trade, the near extermination of the Northeast beaver population, and the consequent loss of beaver ponds altered the regional water balance. Although reconstructions of colonial beaver populations have been made, none link the decline in beavers to its hydrologic impact. Beaver population models based on pre-colonial population estimates, historic harvest rates, and current-day population dynamics were used to simulate the corresponding decrease in pond numbers over time. Beaver populations declined dramatically during the seventeenth century, with harvest rates estimated at 2,000-10,000 beavers per year, resulting in expatriation in some sub-regions by the early 1700s. Using contemporary estimates of beaver pond volumes, the calculated loss in pond storage between 1600 and 1840 was approximately 17 million cubic meters of water and sediment, considerably larger than estimated storage gains from dam construction in the same period, suggesting that beaver eradication was a major driver of hydrologic change during the colonial era.

  12. Constructability - from Qinshan to the ACR

    International Nuclear Information System (INIS)

    Elgohary, M.; Fairclough, N.; Ricciuti, R.

    2003-01-01

    AECL has recognised the importance of Constructability for many years and is applying its principals to CANDU projects with increasing success. Constructability is defined as the consideration of construction knowledge and experience during all phases of a project, and recognizes that maximum benefit can be achieved during the concept phases of a project. The CANDU 6 Nuclear Power Plant has been constructed eleven times in the last 25 years, however, the last two units being completed on the Qinshan project in China have employed some very innovative construction methods that have not been used on the previous units. In order to make nuclear power generation more competitive, shorter construction schedules and reduced project costs and risks are essential objectives. The application of constructability principles is a major contributor to achieving these objectives. The success of Qinshan has increased the confidence in the new construction methods which are being implemented on the ACR (Advanced CANDU Reactor) successfully. An ACR construction strategy that utilizes advanced construction techniques has been developed by AECL. The strategy includes paralleling of activities by using extensive modularization and the vertical installation of equipment and modules into the reactor building, using a VHL (Very Heavy Lift) crane. This strategy allows short schedules to be met with a minimum risk to the project. This paper describes the latest construction methods used successfully on the Qinshan CANDU 6 project and looks at the extensive implementation of similar methods for ACR. It is concluded, based on the Qinshan success, that the ACR construction schedule is readily achievable. (author)

  13. Shaft torsional oscillation interactions between turbo-generators in parallel in series compensated transmission systems

    Energy Technology Data Exchange (ETDEWEB)

    Mello, F.P. de

    1994-12-31

    Several investigators have raised the possibility of interaction between shaft systems of parallel units, particularly among identical units. The question addressed in this paper is the significance of this interaction between shaft systems of units coupled through the electrical system. A time domain model of two parallels units connected to an infinite bus trough a series compensated transmission is used to evaluate the phenomena. The same model is used to extract pertinent frequency response functions by Fourier processing of pulse response tests from which a frequency response analysis is performed to lend additional insight into the phenomena. (author) 8 refs., 13 figs., 3 tabs.

  14. Safety in construction industry - overview

    International Nuclear Information System (INIS)

    Chockalingam, S.; Nehru, R.M.; Ramprasad, K.; Sonawane, A.U.

    2016-01-01

    The construction industry plays an important role in the social and economic development in a country. Safety in the construction industry is considered a major issue in developed and developing countries. In urban sector of India increasing numbers of workers have taken up construction work as a means of immediate employment, which provides cash earnings at the end of the day. Being as unorganized sector, the fatal injuries in DAE unit for the construction industry (Nuclear Power Project including BHAVINI: 62.7% from 1999 to 2014) is higher than the category for all other units (UCIL:13.3%; ECIL:6.7%; NFC and ZC: 4%; HWP: 2.7%; IREL:2.7%; Nuclear Power Plant: 2.7% etc., from 1999 to 2014). A variety hazards exist in the construction site. The best way to protect workers against workers against hazards is to control problems at the source. The problem regarding construction industry is not that the hazards and risks are unknown, but it very difficult to accurately identify in a constantly changing work environment. To prevent hazards at work, all possible hazards that may be encountered should be identified in advance through Job Hazard Analysis (JHA). The present scenario has deduced a fact that efficient Safety Management Techniques (SMT) are (essential for today's construction companies and adaptation of legal requirements including regulatory requirements and proactive safety management techniques will help organizations in providing a better workplace to its employees and reduce the accidents. (author)

  15. Learning through delivery, Westinghouse AP1000 plant construction

    International Nuclear Information System (INIS)

    Gorgemans, J.; Hinman, R.D.; Steuck, C.M.; Greco, P.L.

    2014-01-01

    The AP1000 plant, which is a 1100 MWe class pressurized water reactor with passive safety features, is designed around a conventional 2 loop, 2 steam generator primary system configuration with 2 hot legs, 4 reactor coolant pumps directly mounted in the steam generator lower head and 4 cold legs. A particular feature of AP1000 is its modular construction to minimize the time and cost of construction. Modular construction allows activities to be run in parallel, it allows more activities to be performed in a controlled factory instead of in the field, and it provides a better level of quality. The AP1000 plant design includes 106 structural modules and 52 mechanical modules. Structural modules include all penetrations for piping, cable trays, HVAC duct runs, and all reinforcement for pipe, equipment hangers, and supports. Structural modules are shipped in sub-modules to support transportation by rail or truck or barge. Mechanical modules contain equipment such as pumps, tanks, heat exchangers, air-handling units, and filters along with interconnecting pipes, valves, instruments, wiring and support services. Modular construction requires strong coordination between engineering, supply chain and construction. A total of 8 AP1000 units are currently under construction in China and in the United States. The lessons learned and best practices of each new AP1000 construction are systematically incorporated into the standard design. (A.C.)

  16. Multi-objective genetic optimization of linear construction projects

    Directory of Open Access Journals (Sweden)

    Fatma A. Agrama

    2012-08-01

    Full Text Available In the real world, the majority cases of optimization problems, met by engineers, are composed of several conflicting objectives. This paper presents an approach for a multi-objective optimization model for scheduling linear construction projects. Linear construction projects have many identical units wherein activities repeat from one unit to another. Highway, pipeline, and tunnels are good examples that exhibit repetitive characteristics. These projects represent a large portion of the construction industry. The present model enables construction planners to generate optimal/near-optimal construction plans that minimize project duration, total work interruptions, and total number of crews. Each of these plans identifies, from a set of feasible alternatives, optimal crew synchronization for each activity and activity interruptions at each unit. This model satisfies the following aspects: (1 it is based on the line of balance technique; (2 it considers non-serial typical activities networks with finish–start relationship and both lag or overlap time between activities is allowed; (3 it utilizes a multi-objective genetic algorithms approach; (4 it is developed as a spreadsheet template that is easy to use. Details of the model with visual charts are presented. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in optimizing the scheduling of linear construction projects.

  17. Hitachi's experience and achievements in ABWR construction

    International Nuclear Information System (INIS)

    Inoue, Takashi; Miura, Jun; Murayama, Kouichi

    2003-01-01

    Hitachi, Ltd. (Hitachi) is taking charge of the turbine island of Chubu Electric Power Company's Hamaoka nuclear power plant Unit No. 5 (Hamaoka 5), and all facilities of Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2). Hitachi has achieved shorter schedules and lower costs in the two projects with the following construction methods. First, Hitachi applied modularization and the area-by-area method. These methods enable us to undertake building and installation work in parallel. Second, the floor packaging construction method enables us to finish installation in every area earlier than conventional methods. Moreover, manpower can be distributed evenly. This paper reports the application of these advanced construction methods to the Hamaoka 5 and Shika 2 projects. Installations such as RCCV modules and condenser blocks are presented in this paper. In addition, Hitachi is using 3D-CAD engineering and our own construction management system to optimize the planning of construction procedures and the installation of equipment in these projects. Thus Hitachi is always striving to improve the reliability, safety and economy of ABWR construction technologies. (author)

  18. 29 CFR 785.7 - Judicial construction.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Judicial construction. 785.7 Section 785.7 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR STATEMENTS OF GENERAL... Hours Worked § 785.7 Judicial construction. The United States Supreme Court originally stated that...

  19. Construction Industry Related Mathematics: Seventh Grade.

    Science.gov (United States)

    Mundell, Scott

    The field tested construction industry-related mathematics unit is intended to familiarize seventh grade students with various facets of the construction industry, including the various occupations available and the mathematical abilities and other skills and training necessary to pursue an occupation in the industry. The final set of activities…

  20. Design and testing of high temperature micro-ORC test stand using Siloxane as working fluid

    Science.gov (United States)

    Turunen-Saaresti, Teemu; Uusitalo, Antti; Honkatukia, Juha

    2017-03-01

    Organic Rankine Cycle is a mature technology for many applications e.g. biomass power plants, waste heat recovery and geothermal power for larger power capacity. Recently more attention is paid on an ORC utilizing high temperature heat with relatively low power. One of the attractive applications of such ORCs would be utilization of waste heat of exhaust gas of combustion engines in stationary and mobile applications. In this paper, a design procedure of the ORC process is described and discussed. The analysis of the major components of the process, namely the evaporator, recuperator, and turbogenerator is done. Also preliminary experimental results of an ORC process utilizing high temperature exhaust gas heat and using siloxane MDM as a working fluid are presented and discussed. The turbine type utilized in the turbogenerator is a radial inflow turbine and the turbogenerator consists of the turbine, the electric motor and the feed pump. Based on the results, it was identified that the studied system is capable to generate electricity from the waste heat of exhaust gases and it is shown that high molecular weight and high critical temperature fluids as the working fluids can be utilized in high-temperature small-scale ORC applications. 5.1 kW of electric power was generated by the turbogenerator.

  1. Advanced gas cooled reactors - Designing for safety

    International Nuclear Information System (INIS)

    Keen, Barry A.

    1990-01-01

    The Advanced Gas-Cooled Reactor Power Stations recently completed at Heysham in Lancashire, England, and Torness in East Lothian, Scotland represent the current stage of development of the commercial AGR. Each power station has two reactor turbo-generator units designed for a total station output of 2x660 MW(e) gross although powers in excess of this have been achieved and it is currently intended to uprate this as far as possible. The design of both stations has been based on the successful operating AGRs at Hinkley Point and Hunterston which have now been in-service for almost 15 years, although minor changes were made to meet new safety requirements and to make improvements suggested by operating experience. The construction of these new AGRs has been to programme and within budget. Full commercial load for the first reactor at Torness was achieved in August 1988 with the other three reactors following over the subsequent 15 months. This paper summarises the safety principles and guidelines for the design of the reactors and discusses how some of the main features of the safety case meet these safety requirements. The paper also summarises the design problems which arose during the construction period and explains how these problems were solved with the minimum delay to programme

  2. Advanced gas cooled reactors - Designing for safety

    Energy Technology Data Exchange (ETDEWEB)

    Keen, Barry A [Engineering Development Unit, NNC Limited, Booths Hall, Knutsford, Cheshire (United Kingdom)

    1990-07-01

    The Advanced Gas-Cooled Reactor Power Stations recently completed at Heysham in Lancashire, England, and Torness in East Lothian, Scotland represent the current stage of development of the commercial AGR. Each power station has two reactor turbo-generator units designed for a total station output of 2x660 MW(e) gross although powers in excess of this have been achieved and it is currently intended to uprate this as far as possible. The design of both stations has been based on the successful operating AGRs at Hinkley Point and Hunterston which have now been in-service for almost 15 years, although minor changes were made to meet new safety requirements and to make improvements suggested by operating experience. The construction of these new AGRs has been to programme and within budget. Full commercial load for the first reactor at Torness was achieved in August 1988 with the other three reactors following over the subsequent 15 months. This paper summarises the safety principles and guidelines for the design of the reactors and discusses how some of the main features of the safety case meet these safety requirements. The paper also summarises the design problems which arose during the construction period and explains how these problems were solved with the minimum delay to programme.

  3. Micro-Masonry: Construction of 3D Structures by Mesoscale Self-Assembly

    Science.gov (United States)

    Fernandez, Javier G.; Khademhosseini, Ali

    2010-01-01

    A general method for construction of three dimensional structures by directed assembly of microscale polymeric sub-units is presented. Shape-controlled microgels are directed to assemble into different shapes by limiting their movement onto a molded substrate. The capillary forces, resulting from the presence of a liquid polymer, assemble the microgels in close contact with the rest of the units and with the free surface, the latter imposing the final geometry of the resulting construct. The result is a freestanding structure composed of one or multiple layers of sub-units assembled in a tightly packed conformation. The applicability of the technique for the construction of scaffolds with cell-laden sub-units is demonstrated. In addition, scaffolds formed by the sequential aggregation of sub-units are produced. PMID:20440697

  4. Quarterly report April 1 - June 30, 1997 [ARPA TRP turboalternator development

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-12

    This is a quarterly report of CALSTART's progress with their programs. Their overall objectives remain: (1) efficiently and responsible management of the program and; (2) assist in the commercialization of the technology by doing the following: identifying potential strategic partners; explaining need and value of turbogenerator; reach important audiences for AlliedSignal; showcase technology at key conferences/briefings; raise technology profile via custom Web information; and extend AlliedSignal turbogenerator outreach efforts.

  5. Wood construction codes issues in the United States

    Science.gov (United States)

    Douglas R. Rammer

    2006-01-01

    The current wood construction codes find their origin in the 1935 Wood Handbook: Wood as an Engineering Material published by the USDA Forest Service. Many of the current design recommendations can be traced back to statements from this book. Since this time a series of development both historical and recent has led to a multi-layered system for use of wood products in...

  6. Construction of Site Risk Model using Individual Unit Risk Model in a NPP Site

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Ho Gon; Han, Sang Hoon [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Since Fukushima accident, strong needs to estimate site risk has been increased to identify the possibility of re-occurrence of such a tremendous disaster and prevent such a disaster. Especially, in a site which has large fleet of nuclear power plants, reliable site risk assessment is very emergent to confirm the safety. In Korea, there are several nuclear power plant site which have more than 6 NPPs. In general, risk model of a NPP in terms of PSA is very complicated and furthermore, it is expected that the site risk model is more complex than that. In this paper, the method for constructing site risk model is proposed by using individual unit risk model. Procedure for the development of site damage (risk) model was proposed in the present paper. Since the site damage model is complicated in the sense of the scale of the system and dependency of the components of the system, conventional method may not be applicable in many side of the problem.

  7. United States housing, 2012

    Science.gov (United States)

    Delton Alderman

    2013-01-01

    Provides current and historical information on housing market in the United States. Information includes trends for housing permits and starts, housing completions for single and multifamily units, and sales and construction. This report will be updated annually.

  8. Indigenous procurement of nuclear components at Tarapur (Paper No. 013)

    International Nuclear Information System (INIS)

    Verma, D.K.; Moss, V.J.

    1987-02-01

    The Tarapur Atomic Power Station (TAPS) was the first nuclear power station in developing countries and the first twin BWR units in the world. The Station has two units of boiling water reactor of very early design; along with its turbo-generator and supporting systems; constructed by M/s. I.G.E. on turnkey basis. Based on vendor recommendations initial operating spares for 5 years of operation were purchased from original equipment manufacturers. This does not call for the participation of the ultimate user; in the design, development, manufacture and quality control and user's participation remained confined to assemble the acceptable component(s) procured from original source in the assembly. As early as 1972, Plant initiated indigenising the nuclear components by gradually increasing the contribution of indigenous industry with due participation of the departmental agencies. Procurement of nuclear components requires development of engineering to an extent; where interphase communication between TAPS and counterpart indigenous industry is practicable to motivate them. Feedback from operation and maintenance practices is also utilised effectively. For some of the components initial sample were developed at TAPS and subsequently bulk fabrication was taken by industry. This paper describes manufacture, quality control during the process of manufacture and procurement of indigenous nuclear components relevant to Tarapur Atomic Power Station. (author)

  9. Nonlinear Disturbance Attenuation Controller for Turbo-Generators in Power Systems via Recursive Design

    NARCIS (Netherlands)

    Cao, M.; Shen, T.L.; Song, Y.H.; Mei, S.W.

    2002-01-01

    The paper proposes a nonlinear robust controller for steam governor control in power systems. Based on dissipation theory, an innovative recursive design method is presented to construct the storage function of single machine infinite bus (SMIB) and multi-machine power systems. Furthermore, the

  10. Engineering development in nuclear power plant construction

    International Nuclear Information System (INIS)

    Guenther, P.

    1979-01-01

    Proceeding from the up-to-now experience in the erection of nuclear power stations, especially of the first and second unit of the Greifswald nuclear power plant, the following essential aspects of the development of constructional engineering are discussed: (1) constructional features and criteria, (2) organizational management, (3) current status and problems in prelimary operations, and (4) possibilities of further expenditure reductions in constructing nuclear power stations

  11. Synthesis on construction unit cost development : technical report.

    Science.gov (United States)

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  12. Reactivation of nuclear power plant construction projects. Plant status, policy issues and regulatory options

    International Nuclear Information System (INIS)

    Spangler, M.B.

    1986-07-01

    Prior to the TMI-2 accident on March 28, 1979, four nuclear power plant units that had previously been issued a construction permit were cancelled, principally because of reduced projections of regional power demand. Since that time, an additional 31 units with CPs have been cancelled and eight units deferred. On December 23, 1985 one of the deferred units (Limerick-2) was reactivated and construction resumed. The primary objective of this policy study is to identify the principal issues requiring office-level consideration in the event of reactivation of the construction of one or more of the nuclear power plants falling into two categories: (1) LWR units issued a construction permit whose construction has been cancelled, and (2) LWR units whose construction has been deferred. The study scope is limited to identifying regulatory issues or questions deserving analysis rather than providing, at this time, answers or recommended actions. Five tasks are addressed: a tabulation and discussion of the status of all cancelled and deferred LWR units; and identification of potential safety and environmental issues; an identification of regulatory or policy issues and needed information to determine the desirability of revising certain rules and policies; and identification of regulatory options and decision criteria; and an identification of decision considerations in determining staff requirements and organizational coordination of LWR reactivation policy and implementation efforts. 41 refs

  13. Ways of decreasing the labour content and construction duration for the RBMK-1000 NPP

    International Nuclear Information System (INIS)

    Chernyshenko, V.M.

    1984-01-01

    Problems associated with reducing the labour content and duration of construction for the RBMK-1000 NPPs are considered. General and specific labour contents for construction of the first units at the Kursk and Chernobylsk, NPPs as well as progress chart for construction-installation work at the 1-st unit of the Smolensk and 3-d unit of the Chernobylsk NPPs are presented. The analysis has shown that reduction in the general labour costs and therefore, duration of construction can be attained by reducing the number of auxiliary objects, increasing the level and mechanization of construction (with optimum utilization of gantry and turret cranes) as well as by mechanization of placing concrete mortars and use of large-block structures. According to preliminary calculations, the introduction of new solutions would ensure reduction of construction periods to 24 months for the second units and reduction of labour content by 8 to 10% at the Kursk and Chernobylsk NPPs

  14. Computer and engineering calculations of Brazilian Tokamak-II

    International Nuclear Information System (INIS)

    Wang, S.; Chen, Y.; Sa, W.P. de; Nascimento, I.C.; Tuszel, A.G.; Galvao, R.M.O.; Machida, M.

    1990-01-01

    Analytical and computer calculations carried out by researches of Physics Institute - University of Sao Paulo (IFUSP), for defining the engineering project and constructing the TBR-II tokamak are presented. The hydrodynamics behavioue and determined parameters for magnetic confinement of the plasma were analysed. The computer code was developed using magnetohydrodynamics (MHD) equations which involve plasma interactions, magnetic field and electrical current circulating in more than 20 coils distributed around toroidal vase of the plasma. The electromagnetic, thermal and mechanical couplings are also presented. The TBR-II will be feed by two turbo-generators with 15 MW each one. (M.C.K.) [pt

  15. Nuclear power in the United States

    International Nuclear Information System (INIS)

    Johnston, J.B.

    1985-01-01

    All over the world except in the United States, nuclear energy is a low cost, secure, environmentally acceptable form of energy. In the United States, civilian nuclear power is dead. 112 nuclear power plants have been abandoned or cancelled in the last decade, and there has been no new order for nuclear plants since 1978. It will be fortunate to have 125 operating nuclear plants in the United States in the year 2000. There are almost 90 completed nuclear power plants and about 45 under construction in the United States, but several of those under construction will eventually be abandoned. About 20 % of the electricity in the United States will be generated by nuclear plants in 2000 as compared with 13 % supplied in the last year. Under the present regulatory and institutional arrangement, American electric utilities would not consider to order a new nuclear power plant. Post-TMI nuclear plants became very expensive, and there is also ideological opposition to nuclear power. Coal-firing plants are also in the similar situation. The uncertainty about electric power demand, the cost of money, the inflation of construction cost and regulation caused the situation. (Kako, I.)

  16. Application of ABWR construction database to nuclear power plant project

    International Nuclear Information System (INIS)

    Takashima, Atsushi; Katsube, Yasuhiko

    1999-01-01

    Tokyo Electric Power Company (TEPCO) completed the construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and No. 7 (K-6/7) as the first advanced boiling water reactors (ABWR) in the world successfully. K-6 and K-7 started their commercial operations in November, 1996 and in July, 1997 respectively. We consider ABWR as a standard BWR in the world as well as in Japan because ABWR is highly reputed. However, because the interval of our nuclear power plant construction is going to be longer, our engineering level on plant construction will be declining. Hence it is necessary for us to maintain our engineering level. In addition to this circumstance, we are planning to wide application of separated purchase orders for further cost reduction. Also there is an expectation for our contribution to ABWR plant constructions overseas. As facing these circumstances, we have developed a construction database based on our experience for ABWR construction. As the first step of developing the database for these use, we analyzed our own activities in the previous ABWR construction. Through this analysis, we could define activity units of which the project consists. As the second step, we clarified the data which are treated in each activity unit and the interface among them. By taking these steps, we could develop our database efficiently. (author)

  17. 75 FR 32313 - Specifications and Drawings for Construction Direct Buried Plant

    Science.gov (United States)

    2010-06-08

    ... construction units for Fiber-to-the-Home, remove redundant or outdated requirements, and simplify the.... Because of Fiber-to-the-Home construction and advancements made in construction installation methods and... Construction Direct Buried Plant AGENCY: Rural Utilities Service, USDA. ACTION: Proposed Rule. SUMMARY: The...

  18. Self-Organized Construction with Continuous Building Material

    DEFF Research Database (Denmark)

    Heinrich, Mary Katherine; Wahby, Mostafa; Divband Soorati, Mohammad

    2016-01-01

    Self-organized construction with continuous, structured building material, as opposed to modular units, offers new challenges to the robot-based construction process and lends the opportunity for increased flexibility in constructed artifact properties, such as shape and deformation. As an example...... investigation, we look at continuous filaments organized into braided structures, within the context of bio-hybrids constructing architectural artifacts. We report the result of an early swarm robot experiment. The robots successfully constructed a braid in a self-organized process. The construction process can...... be extended by using different materials and by embedding sensors during the self-organized construction directly into the braided structure. In future work, we plan to apply dedicated braiding robot hardware and to construct sophisticated 3-d structures with local variability in patterns of filament...

  19. Field Testing of Compartmentalization Methods for Multifamily Construction

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, K. [Building Science Corporation, Westford, MA (United States); Lstiburek, J. [Building Science Corporation, Westford, MA (United States)

    2015-03-01

    The 2012 IECC has an airtightness requirement of 3 air changes per hour at 50 Pascals test pressure for both single-family and multifamily construction in Climate Zones 3-8. Other programs (LEED, ASHRAE 189, ASHRAE 62.2) have similar or tighter compartmentalization requirements, driving the need for easier and more effective methods of compartmentalization in multifamily buildings. Builders and practitioners have found that fire-resistance rated wall assemblies are a major source of difficulty in air sealing/compartmentalization, particularly in townhouse construction. This problem is exacerbated when garages are “tucked in” to the units and living space is located over the garages. In this project, Building Science Corporation examined the taping of exterior sheathing details to improve air sealing results in townhouse and multifamily construction, when coupled with a better understanding of air leakage pathways. Current approaches are cumbersome, expensive, time consuming, and ineffective; these details were proposed as a more effective and efficient method. The effectiveness of these air sealing methods was tested with blower door testing, including “nulled” or “guarded” testing (adjacent units run at equal test pressure to null out inter-unit air leakage, or “pressure neutralization”). Pressure diagnostics were used to evaluate unit-to-unit connections and series leakage pathways (i.e., air leakage from exterior, into the fire-resistance rated wall assembly, and to the interior).

  20. Final environmental statement related to construction of Midland Plant, Units 1 and 2 (Docket Nos. 50-329 and 50-330)

    International Nuclear Information System (INIS)

    1977-01-01

    This is a Final Detailed Statement on Environmental Considerations associated with construction and operation of Midland Plant Units 1 and 2 at Midland, Michigan, pursuant to a construction permit and operating license which has been applied for by the Consumers Power Company. The application is under review by the US Atomic Energy Commission's Regulatory Staff. The environmental impact, including adverse and beneficial effects, of the Midland Plant includes reassignment of use of about 1100 acres of agricultural and residential land for the cooling pond (the plant buildings are located on industrial zoned land); this resulted in the dislocation of approximately 25 residences and relocation of the Midland County Farm to a newly built structure; the destruction of a maximum of 4400 tons of phytoplankton per year at the intake of makeup water from the Tittabawassee River; and a predicted small increase in fogging effects in the near vicinity of the cooling pond. 34 refs., 19 figs., 26 tabs

  1. Ashland outlines $261 million in refinery unit construction

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Ashland Petroleum Co. has spelled out $261 million in projects completed, under way, or planned to produce cleaner fuel and further reduce emissions at two U.S. refineries. The company: Started up at $13 million pollution control system at its 213,400 b/cd Catlettsburg, Ky., plant. Started construction on six projects at its 67,100 b/cd St. Paul Park, Minn., refinery that will cost about $114 million and enable the plant to produce cleaner burning diesel fuel and further reduce emissions

  2. Hard-Hat Detection for Construction Safety Visualization

    OpenAIRE

    Shrestha, Kishor; Shrestha, Pramen P.; Bajracharya, Dinesh; Yfantis, Evangelos A.

    2015-01-01

    In 2012, 775 fatalities were recorded, and many more were injured at construction sites in the United States. Of these, 415 fatalities (54%) were due to fall, slips, and trips as well as being struck by falling objects. In order to decrease fatalities at construction sites to these types of events, the Occupational Safety and Health Administration (OSHA) provides Fall Prevention and OSHA-10 trainings to construction workers. Moreover, safety personnel monitor whether the workers use personal ...

  3. Concreting organization during Chernobylsk NPP construction

    International Nuclear Information System (INIS)

    Lysyuk, R.I.; Kareva, A.P.

    1984-01-01

    Conreting organization during the Chernobylsk NPP construction is described. Processes of extra heavy concrete production and placement, which specific mass constitutes 4t/m 3 at the age of 28 days wiath metallic aggregates and 3.3-3.5 t/m 3 at the same age without aggregates, are considered in short. Basic characteristics of this concrete are presented. At the 4th power unit labour contents for construction works were a 1.5 times lower as compared to the 3rd power unit erection. This progress was achieved by round-the-clock operation of the concrete plant with the 800 m 3 /day output and also by utilization of special equipment for mechanized concrete placement: concrete pumps, automatic concrete mixer, manipulators and concrete pipelines

  4. New NPP Construction Experience in Finland

    International Nuclear Information System (INIS)

    Alm-Lytz, K.

    2016-01-01

    The paper discusses the experiences of the new nuclear power plant construction projects. The topics include the licensing and regulatory oversight process, completion of the design prior to construction, experience and know-how of the participating organisations, quality management in a nuclear construction project, safety culture aspects in a nuclear construction project, and the role and importance of regulator’s oversight. Finland has recent experience of new nuclear power plant construction, one plant unit being under construction close to commissioning phase and one plant unit in construction license phase. Each nation is solely responsible for the safety of its nuclear installations. Therefore, there are also national practices how nuclear power plants are licensed and how the safety and quality of these plants are verified during construction and operation. Differences in licensing, regulations and regulatory practices may have an impact on the design of the plant. There may be differences in how the detailed design has to be documented and how and when it needs to be submitted for approval to the regulator. To avoid surprises due to differences, it is beneficial for the owner and plant vendor to familiarize themselves early enough on the national practices and regulations to ensure that regulatory expectations and processes can be taken into account in the project implementation. In addition, the owner and the plant vendor have to understand what are the national safety goals and safety requirements that the plant has to fulfil, and what they mean to the detailed design of the plant. These have to be clarified and explicitly defined by the owner in terms of design criteria in the bidding documentation to avoid difficulties in the future steps of the project.

  5. On improving the NPP construction long-term planning

    International Nuclear Information System (INIS)

    Solov'ev, M.M.

    1980-01-01

    General approaches to solving the problems of long-term planning of the construction-mounting work volume and introduction of power capacities at different paces of power unit commission and norms of construction time are considered. Problems associated with location and development of subsidiary industries providing NPP construction are discussed. It is shown that decrease of WWER-1000 reactor type NPP construction time from 24 to 12 months results in reduction of required high-skilled engineers, managerial staff, unique construction mechanisms and engines as well as in improvement of conditions for conducting measures on work arrangement during preparation of construction industry and mounting of the first assemblies

  6. Optimal design of compact organic Rankine cycle units for domestic solar applications

    Directory of Open Access Journals (Sweden)

    Barbazza Luca

    2014-01-01

    Full Text Available Organic Rankine cycle turbogenerators are a promising technology to transform the solar radiation harvested by solar collectors into electric power. The present work aims at sizing a small-scale organic Rankine cycle unit by tailoring its design for domestic solar applications. Stringent design criteria, i. e., compactness, high performance and safe operation, are targeted by adopting a multi-objective optimization approach modeled with the genetic algorithm. Design-point thermodynamic variables, e. g., evaporating pressure, the working fluid, minimum allowable temperature differences, and the equipment geometry, are the decision variables. Flat plate heat exchangers with herringbone corrugations are selected as heat transfer equipment for the preheater, the evaporator and the condenser. The results unveil the hyperbolic trend binding the net power output to the heat exchanger compactness. Findings also suggest that the evaporator and condenser minimum allowable temperature differences have the largest impact on the system volume and on the cycle performances. Among the fluids considered, the results indicate that R1234yf and R1234ze are the best working fluid candidates. Using flat plate solar collectors (hot water temperature equal to 75 °C, R1234yf is the optimal solution. The heat exchanger volume ranges between 6.0 and 23.0 dm3, whereas the thermal efficiency is around 4.5%. R1234ze is the best working fluid employing parabolic solar collectors (hot water temperature equal to 120 °C. In such case the thermal efficiency is around 6.9%, and the heat exchanger volume varies from 6.0 to 18.0 dm3.

  7. Progress in resolving construction issues on nuclear projects

    International Nuclear Information System (INIS)

    Reedy, R.F.

    1985-01-01

    The cost of nuclear plant construction in the United States can be drastically reduced. Progress is being made in the reduction of construction costs and with continuing effort much more can be done. The easiest way to attack high costs is to eliminate the unnecessary repairs and rework in construction, along with the time consuming evaluations and dispositions, and to use common sense in design practices. By doing this, millions of dollars could easily be cut from the cost of construction of nuclear powerplants

  8. Cernovoda construction on target for Unit 1 startup in 1994

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    AECL and the Italian company Ansaldo have formed a joint venture to complete the first unit of the five-unit station at Cernovoda, with AECL assuming overall project management. Financing of the project is being provided jointly, with $315 million form the Canadian Export Development Corp. and $175 million from the Italian government. First criticality is scheduled for October 1994, and connection to the grid in December 1994. When complete, Cernovoda will supply 30% of Romania's electricity

  9. Neural network construction via back-propagation

    International Nuclear Information System (INIS)

    Burwick, T.T.

    1994-06-01

    A method is presented that combines back-propagation with multi-layer neural network construction. Back-propagation is used not only to adjust the weights but also the signal functions. Going from one network to an equivalent one that has additional linear units, the non-linearity of these units and thus their effective presence is then introduced via back-propagation (weight-splitting). The back-propagated error causes the network to include new units in order to minimize the error function. We also show how this formalism allows to escape local minima

  10. Active learning units interrelated using TIC’s tools in architectural construction

    Directory of Open Access Journals (Sweden)

    Núria Martí Audí

    2013-08-01

    Full Text Available 0 0 1 141 779 USAL 6 1 919 14.0 Normal 0 21 false false false ES JA X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Tabla normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:Calibri; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-ansi-language:ES; mso-fareast-language:EN-US;} The presence of new technologies in the university world is a matter of fact. Nevertheless, it has not always blended correctly as in many cases TIC incorporation has not taken alumni opinion understood as final users. A correct implementation might evaluate some variables as satisfaction, need, interest and finally that versatility to adapt it to proficient professional training on a regular basis. This paper analyses a new approach to learning in the field of Architectural Construction based on a series of strategically designed and interactive units. The centre of these is the collaborative project; this is based on complex problem-solving situations akin to the professional world; where theory and practice are combined in a discovery-learning process. The tools of Information and Communication Technology are applied, simultaneously facilitating the student’s autonomy in acquiring skills and knowledge.

  11. Pipework in power plant construction

    International Nuclear Information System (INIS)

    Schwarzbach, K.

    1984-01-01

    With the development of conventional power plant construction to large unit sizes and because of the stringent safety requirements in nuclear poer stations, pipework installation has developed into a difficult operation closely inter-related with safety engineering. It is an important factor as far as completion dates and costs are concerned during the timely implementation of a subsequent construction phase which is characterized by high capital intensiveness. In order to keep both under control, prior planning and execution supported by electronic data processing are essential. (orig.) [de

  12. Fire resistance in American heavy timber construction history and preservation

    CERN Document Server

    Heitz, Jesse

    2016-01-01

    This volume presents a history of heavy timber construction (HTC) in the United States, chronicling nearly two centuries of building history, from inception to a detailed evaluation of one of the best surviving examples of the type, with an emphasis on fire resistance. The book does not limit itself in scope to serving only as a common history. Rather, it provides critical analysis of HTC in terms of construction methods, design, technical specifications, and historical performance under fire conditions. As such, this book provides readers with a truly comprehensive understanding and exploration of heavy timber construction in the United States and its performance under fire conditions.

  13. Indigenous Construction Materials for Theater Facilities

    Science.gov (United States)

    2013-09-01

    is shown as a step-by-step plan in Figure 1. ERDC TR-13-13 5 Figure 1. Infrastructure planning. The pyramid can be initially divided into two...disadvantages in terms of constructability, structural integrity, environmental impact, and sociocultural impacts. The lower portions of the pyramid ...United States or the Nile in Sudan and Egypt ) is vital to the local economy and can provide a means for transport- ing such construction materials

  14. PCDD/PCDF reduction by the co-combustion process.

    Science.gov (United States)

    Lee, Vinci K C; Cheung, Wai-Hung; McKay, Gordon

    2008-01-01

    A novel process, termed the co-combustion process, has been developed and designed to utilise the thermal treatment of municipal solid waste (MSW) in cement clinker production and reduce PCDD/PCDF emissions. To test the conceptual design; detailed engineering design of the process and equipment was performed and a pilot plant was constructed to treat up to 40 tonnes MSW per day. The novel process features included several units external to the main traditional cement rotary kiln: an external calcinations unit in which the hot gas calcined the limestone thus making significant energy savings for this chemical reaction; the lime generated was used in a second chamber to act as a giant acid gas scrubber to remove SOx and particularly HCl (a source of chloride); an external rotary kiln and secondary combustion unit capable of producing a hot gas at 1200 degrees C; a gas cooler to simulate a boiler turbogenerator set for electricity generation; the incorporation of some of the bottom ash, calcined lime and dust collector solids into the cement clinker. A PCDD/PCDF inventory has been completed for the entire process and measured PCDD/PCDF emissions were 0.001 ng I-TEQ/Nm(3) on average which is 1% of the best practical means [Hong Kong Environmental Protection Department, 2001. A guidance note on the best practicable means for incinerators (municipal waste incineration), BPM12/1] MSW incineration emission limit values.

  15. A brief review of the construction aggregates market

    Science.gov (United States)

    Willett, Jason Christopher

    2012-01-01

    The U.S. Geological Survey defines the construction aggregates industry as those companies that mine and process crushed stone and/or construction sand and gravel. Aggregates have been used from the earliest times of our civilization for a variety of purposes - construction being the major use. As construction aggregates, crushed stone and construction sand and gravel are the basic raw materials used to build the foundation for modern society. The widespread use of construction aggregates is the result of their general availability throughout the country and around the world along with their relatively low cost. Although construction aggregates have a low unit value, their widespread use makes them major contributors to, and indicators of, the economic well-being of the nation.

  16. Industrial safety management with emphasis on construction safety

    International Nuclear Information System (INIS)

    Bhattacharya, R.

    2016-01-01

    Safety professionals, line managers, team leaders and concerned workers today eagerly discuss to find out the best safety approach for their workplace. Some research suggested that behaviour based and comprehensive ergonomics approaches lead in average reduction of injuries. This article discusses 'the science and engineering' behind improvement in industrial safety aspects particularly at construction sites through various safety approaches. A high degree of commitment to safety by the project management and rigorous and proactive measures are essential to prevent accidents at construction sites particularly in DAE units because of its sensitivity. Persistent efforts by the project management are needed for sustainable and committed safety at work place. The number of fatalities occurring from construction work in DAE units is sometimes disturbing and fall of person from height and through openings are the major causes for serious accidents

  17. Construction of the advanced boiling water reactor in Japan

    International Nuclear Information System (INIS)

    Natsume, Nobuo; Noda, Hiroshi

    1996-01-01

    The Advanced Boiling Reactor (ABWR) has been developed with international cooperation between Japan and the US as the generation of plants for the 1990s and beyond. It incorporates the best BWR technologies from the world in challengeable pursuit of improved safety and reliability, reduced construction and operating cost, reduced radiation exposure and radioactive waste. Tokyo Electric Power Company (MPCO) decided to apply the first ABWRs to unit No. 6 and 7 of Kashiwazaki-Kariwa nuclear power station (K-6 and 7). These units are scheduled to commence commercial operation in December 1996 and July 1997 respectively. Particular attention is given in this discussion to the construction period from rock inspection for the reactor building to commercial operation, which is to be achieved in only 52 months through innovative and challenging construction methods. To date, construction work is advancing ahead of the original schedule. This paper describes not only how to shorten the construction period by adoption of a variety of new technologies, such as all-weather construction method and large block module construction method, but also how to check and test the state of the art technologies during manufacturing and installation of new equipment for K-6 and 7

  18. The use of interorganisational ICT in United States construction projects

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2010-01-01

    In recent research, the use of ICT applications in real time construction projects have been documented and analysed extensively. However, there is a need for identifying and analysing in-depth the mechanisms influencing the use of interorganisational ICT applications and for solutions to eliminate

  19. ADRE, uso intensivo del ploteo orbital en el diagnóstico de turbogeneradores // ADRE, intensive use of the orbital plot in turbogenerators diagnosis.

    Directory of Open Access Journals (Sweden)

    E. Palomino Marín

    2000-10-01

    themultichanal system ADRE®, employee as system of monitoring off-line. The most excellent results in the investigation, aresustained in the use of the presence of relative movement and seismic transducers under the supervision of theVIBROCONTROL®, through which and with the intervention of the ADRE® system, is possible to identify inadequacies in theon-line monitoring and standing defects are diagnosed in the turbogenerator, including sequels left in this by transitory defects.Key words: seismic transducer, transducer of eddy currents, orbit, phase, keyphasor.

  20. 48 CFR 36.207 - Pricing fixed-price construction contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Pricing fixed-price... Contracting for Construction 36.207 Pricing fixed-price construction contracts. (a) Generally, firm-fixed... methods. (b) Lump-sum pricing shall be used in preference to unit pricing except when— (1) Large...

  1. Analysis of the first stage in the reactor accident development at the Chernobyl NPP fourth unit

    International Nuclear Information System (INIS)

    Adamov, E.O.; Vasilevskij, V.P.; Ionov, A.I.

    1988-01-01

    Results of analyzing possible development of the first stage of the accident at the Chernobyl NPP fourth unit from the moment of pressing the Az-5 push button are presented. Calculations were conducted using the TRIADA three-dimensional dynamic program both for conditions without pump switching off and with their switching off. Distribution of neutron field over the core volume was determined according to actual readings of in-core detectors immediately before turbogenerator switching off. It is shown that sufficient reconstruction of neutron field begins immediately after pressing the Az-5 push button. Prohibitive decrease of operative reactivity margin which was admitted by personnel in the accident resulted in the growth of neutron power in reactor lower part within 1.5 s, predominating over power decrease in the upper part. Thus, the average integral power grows achieving the maximum during 7.5 s, after which its sharp decrease begins. Conditions with switching off of 4 circulating pumps lead to intesive growth of power and reactor runaway, initiated in the lower part of the core, which safety rods have not managed to reach. Fuel element temperature at that exceeds fuel melting point in the most power-intensive regions. This causes extremely intensive process of steam generation and overheating, pressure growth in the circuit, short-time decrease of the rate of operating pumps, destruction of fuel channels and the whole reactor. Primary measures assuring RBMK ractor safety were formulated on the basis of conducted investigation

  2. Construction plant requirements for nuclear sites

    International Nuclear Information System (INIS)

    Tatum, C.B.; Harris, J.A.

    1981-01-01

    Planning and developing the temporary construction plant facilities for a nuclear project is equivalent to providing utility services for a small city. Provision of adequate facilities is an important factor in the productivity of both the manual and non-manual work force. This paper summarizes construction facility requirements for a two unit (1300 MWe each) nuclear project. Civil, mechanical and electrical facilities are described, including design, installation and operation. Assignment of responsibility for specific work tasks regarding the construction plant is also discussed. In presenting this data, the authors seek to transfer experience and assist in the provision of adequate facilities on future projects

  3. Concepts for space nuclear multi-mode reactors

    International Nuclear Information System (INIS)

    Myrabo, L.; Botts, T.E.; Powell, J.R.

    1983-01-01

    A number of nuclear multi-mode reactor power plants are conceptualized for use with solid core, fixed particle bed and rotating particle bed reactors. Multi-mode systems generate high peak electrical power in the open cycle mode, with MHD generator or turbogenerator converters and cryogenically stored coolants. Low level stationkeeping power and auxiliary reactor cooling (i.e., for the removal of reactor afterheat) are provided in a closed cycle mode. Depending on reactor design, heat transfer to the low power converters can be accomplished by heat pipes, liquid metal coolants or high pressure gas coolants. Candidate low power conversion cycles include Brayton turbogenerator, Rankine turbogenerator, thermoelectric and thermionic approaches. A methodology is suggested for estimating the system mass of multi-mode nuclear power plants as a function of peak electric power level and required mission run time. The masses of closed cycle nuclear and open cycle chemical power systems are briefly examined to identify the regime of superiority for nuclear multi-mode systems. Key research and technology issues for such power plants are also identified

  4. Constructability and maintainability

    International Nuclear Information System (INIS)

    Hart, R.S.

    1985-01-01

    A set of principles for minimizing the construction schedule was established at the outset of the CANDU 300 programme. Consideration of these principles and other factors led to the development of the unique CANDU 300 station layout. The paper discusses the CANDU 300 station layout and construction methods. In summary, the station layout provides 360 deg. construction access to all buildings, separation of nuclear and non-nuclear systems, precise and minimal physical interfaces between buildings, accommodation of many contractors and construction activities without interference, and maximum flexibility in terms of constructional, financial and supply arrangements. The CANDU 300 further employs modularization, shop fabrication and advanced instrumentation (multiplexers, remote processors, data highways) to minimize construction time. Many of the CANDU 300 features that enhance constructability also contribute to maintainability. These include the 360 deg. access to all principal buildings, the uncluttered and spacious building layouts, the simplification of systems and the high level of modularization. The CANDU 300 has also been designed to facilitate the replacement of all key components, thereby offering an essentially unlimited station life. A prime example is a reduction in the fuel channel inlet end-fitting diameter such that the fuel channels can be shop assembled and easily replaced after the initial 40 years of operation, without an extended unit outage. Maintainability within the reactor building has been given particular attention in the CANDU 300 design; key features of other CANDU reactors (the ability to replace a heat transport system pump motor at power, for example) have been incorporated, while accessibility and maintainability of all systems and components have been enhanced. These and other aspects of maintainability are discussed. (author)

  5. Chapter 17. Electric schema and its changes

    International Nuclear Information System (INIS)

    Feik, K.; Kmosena, J.

    2010-01-01

    In this chapter an electric schema and its changes of the A1 nuclear power plant in Jaslovske Bohunice (the Slovak Republic) are described. Three turbogenerators with power 50 MW were installed in the A1 NPP. Basic description of electrical equipment installed according authentic project and authentic conception of accidental cooling are presented in detail. New conception and equipment of accidental and super-accidental after-cooling of the A1 NPP as well as final solution of electrical part with new functions of accidental and super-accidental after-cooling are presented. Shortcomings of electrical equipment, which originated and were eliminated during construction and operation, are also described.

  6. Methods for reduction of the period for construction and commissioning of NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2004-01-01

    The process of construction of NPP unit is associated with significant amount of engineering, civil construction works, equipment installation and testing works. In order to achieve better economical results from the point of view of the investor, it will be a benefit if the time period for construction and commissioning of the unit is reduced. In order to realize such reduction of the needed time it is possible to utilize some new approaches for installation of heavy equipment, utilization of prefabricated in advance composite modules of equipment and application of new types of construction equipment and techniques. In such way the commissioning period can be reduced, and high quality of the installation works can be achieved. (author)

  7. TRIP RATES FOR CONDOMINIUM CONSTRUCTION PROJECT

    Directory of Open Access Journals (Sweden)

    Wirach Hirun

    2015-01-01

    Full Text Available The number of large scale condominium construction projects had dramatically increased in Bangkok. Many projects had occurred in either densely populated areas or in central business districts, where traffic conditions were usually highly congested. To prevent traffic problems, a traffic impact study must be prepared and submitted for review by concerned public authorities. Unit trip generation rates were important data in traffic impact analysis. Without accurate unit trip generation rates, public agencies could not obtain accurate information on the traffic that will be generated. This study aimed to study trip rates and the factors affecting them for condominium construction project in Bangkok. The data were collected from 30 condominium construction sites located in 15 districts of Bangkok. The analysis used the linear regression method and was divided into three cases: 1 trip rates for all vehicles, 2 trip rates for classified vehicles, and 3 trip rates for all types of condominium. All case analyses considered weekdays, Saturday, and Sunday. The results found that trip rates related to the number of dwellings in the condominium. The trip rates for all vehicle types on weekdays, Saturday, and Sunday were 10.636, 4.647, and 9.294 vehicles per 100 dwelling units per day respectively. The trip rates for six-wheeled and ten-wheeled trucks on weekdays, Saturday, and Sunday were 2.046, 0.975, and 0.575 vehicles per 100 dwelling units per day respectively. The trip rate for four-wheeled trucks and passenger cars on weekdays was 1.960. Regarding condominium types, the trip rate for low rise condominiums for all vehicle types on weekdays was 5.315 while the trip rates for high rise condominiums for weekdays, Saturday, and Sunday were 3.965, 2.667, and 1.261 respectively.

  8. Cooperation in Construction:

    DEFF Research Database (Denmark)

    Vogelius, Peter; Storgaard, Kresten

    2016-01-01

    The study presents a building project executed by a major Danish construction company, where cooperation and its staging were essential for achieving high productivity and competitiveness. The form of this cooperation is the main theme for the article. The contractor actively changed the communic......The study presents a building project executed by a major Danish construction company, where cooperation and its staging were essential for achieving high productivity and competitiveness. The form of this cooperation is the main theme for the article. The contractor actively changed...... the companies in the case can be understood as possessing a social capital which is enforced and united by initiatives of the main contractor. The social capital was built up and maintained through the actual constitution of cooperation already in the initial phase of bidding before the building process....... The management logic of the main contractor is interpreted as based on a sociology-inspired understanding focusing on norms and social values rather than on contractual (law) and functional (engineering) logic, which had hitherto been prevalent in Danish construction management....

  9. Using Purchasing Power Parity to Assess Construction Productivity

    Directory of Open Access Journals (Sweden)

    Rick Best

    2010-12-01

    Full Text Available For many reasons comparing construction productivity between countries is a difficult task. One key problem is that of converting construction costs to a common currency. This problem can be overcome relatively simply by using a basket of construction materials and labour, termed a BLOC (Basket of Locally Obtained Commodities, as a unit of construction cost. Average BLOC costs in each location are calculated from data obtained from a number of sources (quantity surveyors, estimators. Typical building costs obtained from published construction cost data are expressed in BLOC equivalents. Lower BLOC equivalents represent higher productivity as other inputs (largely materials are constant. The method provides a relatively simple and direct method for comparing productivity between different locations.

  10. Advanced construction methods in ACR

    International Nuclear Information System (INIS)

    Elgohary, M.; Choy, E.; Yu, S.K.W.

    2002-01-01

    The ACR - Advanced CANDU Reactor, developed by Atomic Energy of Canada Limited (AECL), is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. This necessitated a much more comprehensive approach in including constructability considerations in the design to ensure that the construction duration is met. For the ACR-700, a project schedule of 48 months has been developed for the nth replicated unit with a 36 month construction period duration from First Concrete to Fuel Load. An overall construction strategy that builds on the success of the construction methods that are proven in the construction of the Qinshan CANDU 6 project has been developed for the ACR. The overall construction strategy comprises the 'Open Top' construction technique using a Very Heavy Lift crane, parallel construction activities, with extensive modularization and prefabrication. In addition, significant applications of up to date construction technology will be implemented, e.g. large volume concrete pours, prefabricated rebar, use of climbing forms, composite structures, prefabricated permanent formwork, automatic welding, and utilization of the latest electronic technology tools such as 3D CADDs modelling yields a very high quality, clash free product to allow construction to be completed 'right the first time' and eliminates rework. Integration of 3D CADDs models and scheduling tools such as Primavera has allowed development of actual construction sequences and an iterative approach to schedule verification and improvement. Modularization and prefabrication are major features of the ACR design in order to achieve the project schedule. For the reactor building approximately 80% of the volume will be installed as modules or prefabricated assembles. This ensures critical path activities are achieved. This paper examines the advanced construction methods implemented in the design in order to

  11. A Study of Construction Reactor Oversight Process in US

    International Nuclear Information System (INIS)

    Yun, I.; Kim, S. Y.; Jeong, G. Y.; Kim, S. P.

    2015-01-01

    This process provides a risk-informed approach such as construction significance determination process (SDP) and construction program performance index analogous to those used in the Reactor Oversight Process (ROP). The cROP has been applied to Vogtle units 3, 4 and V.C. Summer units 2, 3 under construction for the regulatory inspection. In this paper, the cROP is dissected to present its major contents and characteristics. The main features of the cROP can be summarized as followings: 1) The cROP which adopts the concept of the ROP used for operating NPPs assesses NPP under construction periodically to determine the appropriate level of regulatory response. 2) The cROP consists of three parts: the CIP, the CAP and the CEP. 3) The inspections for NPPs under construction can be categorized into three parts: vendor inspection, baseline inspection and supplemental and plant specific inspections. USNRC's regulatory resources can be used effectively based on baseline inspection, which is using ITAAC inspections. The construction SDP is used to assign the color scheme to categorize the significance of inspection findings. Regulatory actions are taken from CAM to which the significance of inspection findings input. In this paper, major contents and characteristics of USNRC's cROP have been presented

  12. Next Generation CANDU: Conceptual Design for a Short Construction Schedule

    International Nuclear Information System (INIS)

    Hopwood, Jerry M.; Love, Ian J.W.; Elgohary, Medhat; Fairclough, Neville

    2002-01-01

    Atomic Energy of Canada Ltd. (AECL) has very successful experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China. This paper examines the construction method that must be implemented during the conceptual design phase of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1. Concrete to In-Service. An overall construction strategy has been developed involving paralleling project activities that are normally conducted in series. Many parts of the plant will be fabricated as modules and be installed using heavy lift cranes. The Reactor Building (RB), being on the critical path, has been the focus of considerable assessment, looking at alternative ways of applying the construction strategy to this building. A construction method has been chosen which will result in excess of 80% of internal work being completed as modules or as very streamlined traditional construction. This method is being further evaluated as the detailed layout proceeds. Other areas of the plant have been integrated into the schedule and new construction methods are being applied to these so that further modularization and even greater paralleling of activities will be achieved. It is concluded that the optimized construction method is a requirement, which must be implemented through all phases of design to make a 42 month construction schedule a reality. If the construction methods are appropriately chosen, the schedule reductions achieved will make nuclear more competitive. (authors)

  13. 75 FR 59933 - Specifications and Drawings for Construction of Direct Buried Plant

    Science.gov (United States)

    2010-09-29

    ... include new construction units for Fiber-to-the-Home, remove redundant or outdated requirements, and... in Fiber-to-the-Home construction as well as installation methods and materials. In order for... for Construction of Direct Buried Plant AGENCY: Rural Utilities Service, USDA. ACTION: Final rule...

  14. Fatal injuries in the United States construction industry involving cranes 1984-1994.

    Science.gov (United States)

    Suruda, A; Liu, D; Egger, M; Lillquist, D

    1999-12-01

    There is little published information concerning the epidemiology of injuries in the construction industry involving cranes other than for electrical injury from power line contact. For the 11-year period of 1984 through 1994, the US Occupational Safety and Health Administration (OSHA) investigated 502 deaths in 479 incidents involving cranes in the construction industry. Electrocution was the largest category, with 198 deaths (39%) reported. Other major categories were assembly/dismantling (58 deaths, 12%), boom buckling (41 deaths, 8%), crane upset/overturn (37 deaths, 7%), and rigging failure (36 deaths, 7%). The majority of the deaths during assembly/dismantling involved removal of the boom pins from lattice boom cranes. Only 34% of the construction firms employing the fatally injured workers had ever been inspected by OSHA. OSHA cited the employer for safety violations in 436 deaths (83%). Additional worker training, increased OSHA inspections, and crane inspection programs could prevent many crane-related deaths.

  15. Construction work management for nuclear power stations

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1982-01-01

    Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)

  16. Forces and stresses in cryoturbogenerator rotor in presence of short circuit

    International Nuclear Information System (INIS)

    Kovarskii, M.E.; Rubinraut, A.M.; Tsyrlin, A.L.

    1981-01-01

    A method is presented for determining the electrodynamic forces, mechanical stresses, and strains in the shells of a cryogenic-turbogenerator cryostat in the presence of an abrupt short circuit. The physical pattern of occurrence of forces in a cryostat shell is considered for capacitive, inductive, and active armature-current cases. It is shown that in addition to the radial component, there is a tangential component of the electrodynamic forces, with the interaction of the two components governing the strength in the presence of short circuits. Results are reported for mechanical-strength calculations, based on the proposed method, for a 200 kw cryogenic turbogenerator

  17. PIK reactor construction status

    International Nuclear Information System (INIS)

    Konoplev, K.A.; Smolsky, S.L.

    2001-01-01

    The 100MW reactor PIK for fundamental researches has a thermal neutron flux of more than 10 15 n/cm 2 sec. This presentation outlines the construction state as of 2001, its prospects and completion tactics in the conditions of unstable finance. Construction of the reactor started in 1976. In 1986 construction of the building was completed and significant part of the installation work fulfilled. Construction of cooling systems was finished, the control panel assembled, and adjustment of the pump and gate valve control circuits started. After Chernobyl catastrophe, the USSR nuclear reactor safety requirements were revised. The PIK design did not meet these requirements and underwent considerable revision. The reconstruction design resulted in double the initial cost. Creation of the containment was the bulkiest part of the reconstruction. It brought about the need to disassemble the roofing of the building, dismantle all the equipment of the two upper floors, and lay up the equipment of the lower floors. As of 2001, construction in accordance with the revised design is at the stage of assemblage of the most important units, i.e. reactor itself, cooling system, heavy water system, and a number of auxiliary systems, such as depleted fuel storage, emergency cooling system etc. (orig.)

  18. Cernavoda NPP Unit 2 and Romanian nuclear industry

    International Nuclear Information System (INIS)

    Mocanu Horia

    2001-01-01

    On 18 May 2001, in the presence of Mr. Adrian Nastase, the Prime-Minister of Romania, the presidents of AECL, ANSALDO and Director General of SN Nuclearelectrica, the commercial and management contract for completing the Cernavoda NPP Unit 2 was signed. This document stipulates the goal and the partners' commitments, leadership organization, the SN Nuclearelectrica's control of the Budget, costs for the technical assistance (around 180 specialists from abroad), as well as the costs of equipment supplied from Canada and Italy. Services and equipment supplied by Canada and Italy amounts up to around USD 300 millions. Efforts are currently undertaken to obtain a loan of USD 300 millions from EURATOM, beginning from 2003. An auction process, implying around 10 companies, is underway and by the completion of the process, in February 2002, the practical delivery of equipment will start. The so-far invested capital amounts around USD 650 millions while the capital funds remaining to be invested amounts up to about USD 689 millions. From the latter figure, around USD 100 millions represent the costs for heavy water and the initial nuclear fuel charging. The personnel dynamics is presented as well as problems relating with recruitment and salary policy. Romanian nuclear industry is engaged for supply of a series of important components. General Turbo SA, supplied already components of some tens USD millions for the turbogenerator complex. PETROTUB company from Roman, Romania supplied already one thousand tones of non-nuclear carbon steel tubing valued at about USD 300 millions. ARIO, Bistrita, Romania, has signed contracts valued at about USD 400,000 for non-nuclear reinforcing materials. Other companies like AVERSA SA and Ventilatorul SA supplied reliable equipment for Unit 1 and will continue to do the same for Unit 2. Contracts of over one million USD are carried on with VULCAN for carbon steel fittings and with TITAN Nuclear Equipment for components of the fueling

  19. Development of new construction technologies for nuclear power plant

    International Nuclear Information System (INIS)

    Kawamata, Susumu; Itoh, Daisuke; Ichizono, Katsuyuki

    1995-01-01

    In order to proceed rationally with the construction of a nuclear power station, the followings are the subject to solve beside reducing the construction cost: shortening the construction period, improving the quality, and securing safety in the construction work. As a measure to solve the matters, we correctly construct the plant mainly applying 'all-weather proof construction method' and 'pre-assembled large-block construction method'. Furthermore, as the plant construction control system, we perform a construction work applying the design change management system, pre-assessment for safety, and the whole facility check. As a result of our effort, it was attained that when we compare the matured plant with the first unit, the construction cost is reduced by 30%, the construction period is shortened by 12 months, site manpower is decreased by 30%, and the plant had no sudden shutdowns even during the trial operation period. (author)

  20. The impact of occupational health and safety regulations on prevention through design in construction projects: Perspectives from Spain and the United Kingdom.

    Science.gov (United States)

    Martínez-Aires, María Dolores; Rubio Gámez, María Carmen; Gibb, Alistair

    2015-01-01

    Since the mid-1990 s, Prevention through Design (PtD) has become increasingly prevalent in the built environment. The acceptance of PtD has largely been due to the removal or reduction of risks during the execution phase of construction projects. European States have had the added impetus of national legislation. This paper analyzes the influence of European Union Directive 92/57/EEC on occupational safety and health injury prevention in the project design phase. Qualitative methods comprised individual semi-structured interviews and focus groups with a panel of experts. Sixty individuals from construction and related professions (architects, engineers, constructors, developers, and other construction experts) answered 17 key questions to establish national perceptions of the effectiveness of Directive 92/57/EEC in Spain and the United Kingdom (UK). The implementation of PtD in the project design phase in the UK is clearer since the regulations explicitly state the obligations of project designers as well as those of the coordinator. Interviews with Spanish experts show that, in Spain, the prevention culture is less frequently realized. The most significant differences between the European Directive and national regulations which influence PtD are linked to the Health and Safety Coordinator, and Health and Safety documents.

  1. Fabulous Facilities: New Constructions and Renovations.

    Science.gov (United States)

    American Libraries, 1997

    1997-01-01

    Renovation and construction projects in 18 public and academic libraries across the United States are showcased, with 23 photographs illustrating library interiors and exteriors. Discussion centers on architecture, costs, technology infrastructure and equipment, preservation of old facilities, furniture, and library functions. (AEF)

  2. Problems and prospects of nuclear power plants construction

    Directory of Open Access Journals (Sweden)

    Pergamenshhik Boris Klimentyevich

    2014-02-01

    Full Text Available 60 years ago, in July 1954 in the city of Obninsk near Moscow the world's first nuclear power plant was commissioned with a capacity of 5 MW. Today more than 430 nuclear units with a total capacity of almost 375000 MW are in operation in dozens of the countries worldwide. 72 electrical power units are currently under construction, 8 of them are located in the Russian Federation. There will be no alternative to nuclear energy in the coming decades. Among the factors contributing to the construction of nuclear power plants reckon limited fossil fuel supply, lack of air and primarily carbon dioxide emissions. The holding back factors are breakdown, hazard, radioactive wastes, high construction costs and long construction period. Nuclear accidents in the power plant of «Three-Mile-Island» in the USA, in Chernobyl and in Japan have resulted in termination of construction projects and closure of several nuclear power plants in the Western Europe. The safety systems have become more complex, material consumption and construction costs have significantly increased. The success of modern competing projects like EPR-1600, AP1000, ABWR, national ones AES-2006 and VVER-TOI, as well as several others, depends not only on structural and configuration but also on construction and technological solutions. The increase of the construction term by one year leads to growth of estimated total costs by 3—10 %. The main improvement potentials include external plate reinforcement, pre-fabricated large-block assembly, production and installation of the equipment packages and other. One of the crucial success factors is highly skilled civil engineers training.

  3. Draft environmental statement related to construction of Erie Nuclear Plant, Units 1 and 2: (Docket Nos. STN 50-580 and STN 50-581)

    International Nuclear Information System (INIS)

    1977-11-01

    The proposed action is the issuance of construction permits to the Ohio Edison Company, acting on behalf of itself, the Cleveland Electric Illuminating Company, Duquesne Light Company, Pennsylvania Power Company, and the Toledo Edison Company, for the construction of the Erie Nuclear Plant Units 1 and 2, located in Erie County, Ohio. A total of 704 hectares (ha) (1740 acres) will be used for the Erie plant site. Construction-related activities on the primary site will disturb about 223 ha (551 acres). Approximately 641 ha (1584 acres) will be required for transmission line rights-of-way. The 3.86-km (2.4-mile) intake and discharge pipeline land corridor will involve alteration of approximately 13 ha (32 acres) of corridor and 1 ha (2.5 acres) for shore facilities. Also, 3.9 ha (9.6 acres) of lake bottom will be disturbed to provide 15-m-wide (50-ft-wide) trenches and an additional 15-m-wide (50-ft-wide) area for storage of excavated material for subsequent backfill for the 701-m (2300-ft) intake and 579-m (1900-ft) discharge lines. Plant construction will involve some community impacts. No residents will be displaced from the site property. Traffic on local roads will increase due to construction and commuting activities. The influx of construction workers' families (a peak work force of about 2700) is expected to cause no major housing or school problems. It is assumed that aquatic organisms entrained in the circulating water system will be killed due to thermal and mechanical shock. The maximum impact based on the population densities of phytoplankton and zooplankton organisms in the adjacent lake area will be the destruction of 0.1% of the entrainable organisms from the lake water. The entrainment of fish larvae will not constitute a significant impact on the lake fishery. 62 figs., 32 tabs

  4. Y-12 Construction/Demolition Landfill VII: Permit application: Part 1 and 2

    International Nuclear Information System (INIS)

    1992-04-01

    The United States Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reservation (ORR) at Oak Ridge, Tennessee: the Y-12 Plant, the K-25 Site, and the Oak Ridge National Laboratory (ORNL). Operations associated with the DOE energy research and production facilities at Oak Ridge result in the production of several types of waste materials. Disposal of solid waste (as defined in the Solid Waste Processing and Disposal Rules for Tennessee) in disposal facilities operated by the Y-12 Plant is the responsibility of Y-12 Waste Management Division (MWD). The WMD is proposing to develop a facility that will include two new disposal units: one for construction/demolition waste and spoil and one for industrial solid waste. This manual describes the closure and post-closure plans for the construction/demolition waste and spoil disposal unit. This disposal unit is referred to as the Y-12 Construction/Demolition Landfill VII (CD-VII) and is to be operated by the Y-12 Plant for the DOE. This will be a Tennessee Department of Environment and Conservation/Division of Solid Waste Management (TDEC/DSWM) Class IV disposal unit

  5. Historical construction costs of global nuclear power reactors

    International Nuclear Information System (INIS)

    Lovering, Jessica R.; Yip, Arthur; Nordhaus, Ted

    2016-01-01

    The existing literature on the construction costs of nuclear power reactors has focused almost exclusively on trends in construction costs in only two countries, the United States and France, and during two decades, the 1970s and 1980s. These analyses, Koomey and Hultman (2007); Grubler (2010), and Escobar-Rangel and Lévêque (2015), study only 26% of reactors built globally between 1960 and 2010, providing an incomplete picture of the economic evolution of nuclear power construction. This study curates historical reactor-specific overnight construction cost (OCC) data that broaden the scope of study substantially, covering the full cost history for 349 reactors in the US, France, Canada, West Germany, Japan, India, and South Korea, encompassing 58% of all reactors built globally. We find that trends in costs have varied significantly in magnitude and in structure by era, country, and experience. In contrast to the rapid cost escalation that characterized nuclear construction in the United States, we find evidence of much milder cost escalation in many countries, including absolute cost declines in some countries and specific eras. Our new findings suggest that there is no inherent cost escalation trend associated with nuclear technology. - Highlights: •Comprehensive analysis of nuclear power construction cost experience. •Coverage for early and recent reactors in seven countries. •International comparisons and re-evaluation of learning. •Cost trends vary by country and era; some experience cost stability or decline.

  6. The Unitality of Quantum B-algebras

    Science.gov (United States)

    Han, Shengwei; Xu, Xiaoting; Qin, Feng

    2018-02-01

    Quantum B-algebras as a generalization of quantales were introduced by Rump and Yang, which cover the majority of implicational algebras and provide a unified semantic for a wide class of substructural logics. Unital quantum B-algebras play an important role in the classification of implicational algebras. The main purpose of this paper is to construct unital quantum B-algebras from non-unital quantum B-algebras.

  7. Constructing a Tibetan Demos in Exile

    DEFF Research Database (Denmark)

    Brox, Trine

    2012-01-01

    homeland. Two specific instances of the construction of a transnational exile demos are investigated: citizenship and political representation. The Tibetan Government-in-Exile's formalized idea of citizenship builds upon ideals of equal and loyal members who form a single unit bounded by a common cause...

  8. Constructibility assessment of APR1400

    International Nuclear Information System (INIS)

    Cho, Sung Jae; Kang, Yong Chul; Lee, Jae Gon; Lim, Woo Sang

    2003-01-01

    APR1400 (formerly KNGR) development is one of national G-7 projects sponsored by government and KHNP (Korea Hydro and Nuclear Power Co., LTD). It is an evolutionary standard reactor with the thermal output of 4000MWt and has been adopted for Shin-Kori Unit 3 and 4. The government organizations, research institutes, universities and industries have participated in the project since 1992 along with KHNP, and the standard design certification program was issued in May 2002. The project set up the top-tier requirements about the safety, economy, operability and maintainability, and constructibility in the early design stage. The requirements have been evaluated periodically during the design process, and the results were reflected to the design. This paper describes the methods for constructibility enhancement and the results of schedule analysis to assure meeting construction duration target, which is set to 48 months from the first concrete pouring to the commercial operation on the condition that learning effects are maximized at Nth plant. To meet the target schedule, the design characteristics and constructibility studies such as new construction methods and construction schedule analysis were performed. The new construction methods presented here are over the top method for NSSS components, deck plate and steel from for concrete wall and slab, automatic welding for large bore piping, and modularization of components and structure, etc. (author)

  9. Turbidity monitoring at select MDOT construction sites.

    Science.gov (United States)

    2012-06-01

    The objective of this project was to establish baseline turbidity conditions at select construction : sites by establishing a water quality monitoring program and documenting MDOT approved : BMPs on site. In 2009 the United States Environmental Prote...

  10. The Influence of an Information Environment on Construction Organization's Culture: A Case Study

    OpenAIRE

    Kenneth T. Sullivan; Dean T. Kashiwagi; Nathan Chong

    2009-01-01

    Construction professionals have identified public contract law and bureaucratic procurement/contract offices as a source of problems in the construction industry. The culture within the United State's Federal Government Acquisitions is based on the Federal Acquisition Regulations (FARs) and its interpretation, often placing organizations/agencies in the price-based environment and continuously resulting in poor performance. The United States Army Medical Command (MEDCOM) (approximately $100 M...

  11. A Global Review of Sustainable Construction Project Financing: Policies, Practices, and Research Efforts

    Directory of Open Access Journals (Sweden)

    Ming Shan

    2017-12-01

    Full Text Available Despite the increasing investment in sustainable development over the past decade, a systematic review of sustainable construction project financing is lacking. The objectives of this paper are to conduct a systematic review to examine the policies, practices, and research efforts in the area of sustainable construction project financing, and to explore the potential opportunities for the future research. To achieve these goals, this paper first reviewed the sustainable construction project financing practices implemented by four representative developed economies including the United Kingdom, the United States, Singapore, and Australia. Then, this paper reviewed the efforts and initiatives launched by three international organizations including the United Nations, the Organization for Economic Co-operation and Development, and International Finance Corporation. After that, this paper reviewed the research efforts of sustainable construction project financing published in peer-review journals and books. This paper identified four major research themes within this area, which are the review of financial stakeholders and market of sustainable construction, benefits and barriers to sustainable construction project financing, financial vehicles for sustainable construction projects, innovative models and mechanisms for sustainable construction project financing. Additionally, this paper revealed five directions for the future research of sustainable construction project financing, which are the identification of financial issues in sustainable construction projects, the investigation of financial vehicles for sustainable construction projects in terms of their strengths, limitations, and performances, the examination of critical drivers for implementing sustainable construction project financing, the development of a knowledge-based decision support system for implementing sustainable construction financing, and the development of best practices for

  12. Integrated Cr(VI) removal using constructed wetlands and composting.

    Science.gov (United States)

    Sultana, Mar-Yam; Chowdhury, Abu Khayer Md Muktadirul Bari; Michailides, Michail K; Akratos, Christos S; Tekerlekopoulou, Athanasia G; Vayenas, Dimitrios V

    2015-01-08

    The present work was conducted to study integrated chromium removal from aqueous solutions in horizontal subsurface (HSF) constructed wetlands. Two pilot-scale HSF constructed wetlands (CWs) units were built and operated. One unit was planted with common reeds (Phragmites australis) and one was kept unplanted. Influent concentrations of Cr(VI) ranged from 0.5 to 10mg/L. The effect of temperature and hydraulic residence time (8-0.5 days) on Cr(VI) removal were studied. Temperature was proved to affect Cr(VI) removal in both units. In the planted unit maximum Cr(VI) removal efficiencies of 100% were recorded at HRT's of 1 day with Cr(VI) concentrations of 5, 2.5 and 1mg/L, while a significantly lower removal rate was recorded in the unplanted unit. Harvested reed biomass from the CWs was co-composted with olive mill wastes. The final product had excellent physicochemical characteristics (C/N: 14.1-14.7, germination index (GI): 145-157%, Cr: 8-10mg/kg dry mass), fulfills EU requirements and can be used as a fertilizer in organic farming. Copyright © 2014 Elsevier B.V. All rights reserved.

  13. The AP1000{sup R} China projects move forward to construction completion and equipment installation

    Energy Technology Data Exchange (ETDEWEB)

    Harrop, G. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    The AP1000 design is the only Generation III+ technology to receive design certification from the U.S. Nuclear Regulatory Commission. This evolutionary design provides the highest safety and performance standards and has several distinct advantages over other designs, including improved operations and reduced construction schedule risks through the use of modern, modular, engineering principles that allow construction and fabrication tasks traditionally performed in sequence to be undertaken in parallel. Since the first granting of Design Certification in 2005 by the NRC, the AP1000 design has been modified to meet emergent NRC requirements such as those requiring the design to withstand the impact of an aircraft crash. Both domestic and foreign utilities have turned to the Westinghouse AP1000 plant design to meet their near - and long-term sustainable energy needs. The first ever deployment of this advanced U.S. nuclear power technology began in China in 2007 with the award of a contract to build four AP1000 units, constructed in pairs at the coastal sites of Sanmen (Zhejiang Province) and Haiyang (Shandong Province). Currently, all four units are at an advanced stage of construction. The commercial operation date for Sanmen Unit 1 is November 2013 followed by Haiyang Unit 1 being operational in May 2014. Construction and equipment manufacture is at an advanced stage. Sanmen Unit 1 equipment that has been delivered includes the reactor vessel, the reactor vessel closure head, the passive residual heat removal heat exchanger, the integrated head package, the polar crane, and the refueling machine. The steam generators are also completed. The RV was installed within the containment vessel building in September 2011. The installation of this major equipment will allow the setting of the containment vessel top head. Haiyang Unit 1 is also achieving significant progress. Significant benefits continue to be realized as a result of lessons learned and experience gained

  14. Final supplement to the final environmental statement related to construction of Skagit Nuclear Power Project, Units 1 and 2: (Docket Nos. STN 50-522 and STN 50-523)

    International Nuclear Information System (INIS)

    1977-04-01

    The proposed action is the issuance of construction permits to the Puget Sound Power and Light Company, Pacific Power and Light Company, Washington Water Power Company and the Portland General Electric Company, for the construction of Skagit Nuclear Power Projects Units 1 and 2 in Skagit County, Washington (about 64 miles north of Seattle and 6 miles ENE of Sedro Woolley). These units are scheduled for commercial service in 1984 and 1986, respectively. The exhaust steam from the turbine-generators will be cooled in condensers which will utilize one hyperbolic-type natural-draft cooling tower per unit to dissipate heat to the atmosphere. Water (106 cfs max.) for the cooling tower makeup (82.4 cfs) and other plant uses will be withdrawn from the Skagit River through Ranney Collectors embedded in the north bank of the river and pumped to the plant through a pipeline about 35,000 ft. long. Cooling tower blowdown (7 cfs max.) from the project and dilution water (20 cfs max.) will flow through a pipeline back to the river where it will be discharged through a diffuser. Approximately 1750 acres of forested and agricultural land will be removed from harvesting for the life of the power plant; 360 acres of this land will be diverted to industrial use. This will affect less than 0.5% of standing forest in Skagit County and 16 acres in cultivated crops and pasturage. Increased siltation of onsite creeks and the Skagit River from construction work and the small amounts of heat and chemicals discharged to the river during plant operation will have insignificant impacts on water quality and aquatic biota due to erosion control efforts and dilution by the large river flow. (16,200 cfs average; 4740 cfs 7-day, 10-yr low). 18 figs

  15. A UKAEA review of gas-cooled reactors in the United Kingdom

    International Nuclear Information System (INIS)

    Heath, E.C.; Knowles, A.N.

    1983-01-01

    The commercial use of nuclear power for electrical generation commenced in the UK in the 1950s with the Calder Hall reactors. Based on this concept, eighteen commercial reactor units, with two further units outside the UK, were constructed and have been in operation for periods ranging from 10 to 19 years. The paper reviews this experience mainly from the aspects of safety and the achieved costs, which compare favourably with current figures for fossil fired generation. The further development of the gas-cooled system in the UK commenced with the construction of the Windscale AGR, which came into operation in 1962. This led to the ordering of 14 large commercial AGR units, 4 of which have been in service since 1976, 6 are at an advanced stage of construction and 4 are at an early stage of construction. The paper reviews the main safety features of the AGR and considers the costs, taking achieved costs for the units which are in service and a combination of historical costs and projected costs for the units under construction. Again a clear advantage over fossil fuelled stations is shown. The paper also includes a preliminary account of the use of the prototype AGR at Windscale for the series of experiments concerning plateout, over-temperature in the fuel and simulated fault transients in the core which were carried out earlier in 1981. (author)

  16. Analysis of energy performance in two systems of cogeneration used in plants of sugar cane; Analise de desempenho energetico em dois sistemas de cogeracao empregados em usinas de cana de acucar

    Energy Technology Data Exchange (ETDEWEB)

    Rocha, Felipe A.A.; Rosa, Rodrigo A. [Cogeracao Sistemas de Energia Ltda., Recife, PE (Brazil)

    2004-07-01

    One of the options to overcome the current volatility in Brazil's power consumption outlook relates to the employment of other sources for power generation, namely solar energy, wind power or the use of biomass, namely the power generation through the cane bagasse. One should realize, however, that the economic accomplishment for launching a generation system should depend on the level of effectiveness of all processes and/or equipment comprising the system thereof. As far as the sugar-alcohol industry is concerned, the larger the system effectiveness is, the bigger the surplus of bagasse becomes and, hence, the better the chance of achieving financial earnings. Two generation systems shall be evaluated, aiming to thermo-dynamically identify the differences between the use of small equipment-driven turbines (like choppers, shredders and mills) and multi-stage turbo-generators, in order to replace the electric-powered drive units. Therefore, one shall follow thermodynamic-based criteria, namely the steam specific consumption, the equipment availability and effectiveness, thus allowing a comparison for each engine. Such survey shows that the effectiveness reaches nearly 68% for the turbo-generators and 43% for the small turbines. Under the economic perspective, one can find a saving of 89.500 tonnes per crop of bagasse, standing for an additional turnover of US$ 895.000,00 annually. (author)

  17. Safstor decommissioning of the Humboldt Bay Power Plant Unit No. 3

    International Nuclear Information System (INIS)

    Nelson, R.T.

    1985-01-01

    The Humboldt Bay Power Plant is located near Eureka, California, about 265 miles north of San Francisco. The plant consists of two fossil fueled units, two mobil gas turbine peaking units, and a nuclear unit - Unit No. 3. Unit No. 3, which utilized a boiling water reactor, was constructed between 1960 and 1963. The unit began commercial operation in August 1963 and operated until July 2, 1976 when it was shutdown for refueling, seismic modifications, and additional seismic and geologic studies. During the years Unit 3 operated it had one of the best operating records of any nuclear power plant in the United States. For its operating lifetime Unit 3 had an overall capacity factor of 63.0% and an availability factor of 85.9%. The unit included certain design features which made it unique among nuclear power plants of its era. Some of these unique features included natural circulation recirculation flow which eliminated the need for costly recirculation pumps, utilization of a pressure suppression containment system which had been developed jointly by PG and E and the General Electric Company, and the fact that the reactor vessel and the containment system were constructed in a caisson below ground level. These design features reduced the overall construction cost of the unit and improved its inherent safety

  18. The advisability of high-rise construction in the city

    Science.gov (United States)

    Sergievskaya, Natalia; Pokrovskaya, Tatyana; Vorontsova, Natalya

    2018-03-01

    In this article there discusses the question of advisability high-rise construction, the reasons for its use, both positive and negative sides of it. On the one hand, a number of authors believe that it is difficult to avoid high-rise construction due to the limited areas in very large cities. On the other hand, a number of other authors draw attention to the problems associated with high-rise construction. The author of the article analyses examples of high-rise construction in several countries (UAE, Dubai "Burj Khalifa"; Japan "Tokyo Sky Tree"; United States of America, "Willis Tower"; Russia "Federation Tower") and proves the advisability of high-rise construction in the city.

  19. 40 CFR 60.2886 - What is a new incineration unit?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a new incineration unit? 60... Waste Incineration Units for Which Construction is Commenced After December 9, 2004, or for Which... incineration unit? (a) A new incineration unit is an incineration unit subject to this subpart that meets...

  20. Collective Training and Fielding Opportunities for the Objective Force Maneuver Systems at the Unit of Action Level in a Unit Manning/Unit Replacement Personnel System

    National Research Council Canada - National Science Library

    Courts, Michael

    2003-01-01

    The introduction of Objective Force formations, beginning with the first Unit of Action, will fundamentally change existing organizational structures, training requirements and operational constructs for the U.S. Army...

  1. Study of the self-regulating properties of a WWER reactor

    International Nuclear Information System (INIS)

    Filo, J.; Trnkusz, J.; Polak, V.

    1979-01-01

    The results of a self-regulation experiment carried out on the V-1 reactor in Czechoslovakia in the period of the start-up are presented. The kinetic state of the reactor was modified by varying the position of the automatic control rods, the power of the turbogenerators and by switching off a main pump in the primary circuit, on power levels of 35, 55, 75 and 90%. The important thermal parameters of the reactor, the electric power of the turbogenerators, the neutron flux, the position of the automatic control rod group and the concentration of the boric acid in the coolant have been measured. (R.J.)

  2. Construction-man hour estimation for nuclear power plants

    International Nuclear Information System (INIS)

    Paek, J.H.

    1987-01-01

    This study centers on a statistical analysis of the preliminary construction time, main construction time, and total construction man hours of nuclear power plants. The use of these econometric techniques allows the major man hour driving variables to be identified through multivariate analysis of time-series data on over 80 United States nuclear power plants. The analysis made in this study provides a clearer picture of the dynamic changes that have occurred in the man hours of these plants when compared to engineering estimates of man hours, and produces a tool that can be used to project nuclear power plant man hours

  3. Improvements in the construction of nuclear power plant

    International Nuclear Information System (INIS)

    1990-01-01

    This paper outlines activities to minimize the amount of work at a construction site by employing installation method with large size blocks and shop-assembled units, improvement in facilities such as mechanization of welding and huge roof cover which enables work in all weather conditions, and administration systems using computer for the work activity control as well as quality and progress control for construction work. These improvements are only achieved when supported by related system improvements at the design and fabrication stage, and these improvements contributed a great deal to the quality assurance and the shorter construction period. (author)

  4. Construction of large-thickness sand cushions for NPP foundations

    International Nuclear Information System (INIS)

    Krantsfel'd, Ya.L.; Losievskaya, I.K.; Kovalenko, R.P.; Mutalipov, A.

    1982-01-01

    A study is made on some technological peculiarities of preparation of NPP foundations and control methods of foundation density. As an example the experience of cement-sand foundation construction for two 900 MW power-units at the Koeberg South Africa NPP is briefly described. The experience of artificial foundation construction at this NPP indicates both the possibility of obtaining the required quality of cement-sand cushions and commercial construction of large volume of such cushions by acceptable rates and the necessity of unification of work quality characteristics

  5. 40 CFR 60.2015 - What is a new incineration unit?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a new incineration unit? 60... Industrial Solid Waste Incineration Units for Which Construction Is Commenced After November 30, 1999 or for... is a new incineration unit? (a) A new incineration unit is an incineration unit that meets either of...

  6. Cogeneration plant Mitte. Environmental-friendly energy geneation in the heart of Berlin; Heizkraftwerk Mitte. Umweltschonende Energieerzeugung im Herzen von Berlin

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    In the past, Vattenfall Europe Generation set a good example by operating the 800/900 MW generating units from 1991 to 2000. The introduction of supercritical steam parameters made net efficiency factors of more than 40% possible, even for lignite-fired power plants. To be exact, levels of about 42% could be reached. The article presents examples for the heat cycle layout and offers solutions to problems of the turbo-generating set, the main-steam pipelines and the steam boiler. The next generation of coal-fired power plants will then reach efficiency factors of more than 50%, thanks to steam temperatures of about 700 C. (GL)

  7. The nuclear industry in France

    International Nuclear Information System (INIS)

    Degot, D.

    1981-02-01

    The French nuclear industry is organized around the following main participants: - The E.D.F., owners, industrial architects and operators of the power stations, - The C.E.A. for research and development, with its subsidiary the COGEMA, who deal with all problems involving the fuel cycle, - The Industry with FRAMATOME in charge of the manufacture of nuclear boilers, and ALSTHOM-ATLANTIQUE in charge of turbo-generator units. This paper deals with the activities covered by FRAMATOME and its industrial environment. The standardization of PWR power stations built by French industry and the possibilities of exporting PWR power stations are given a brief mention [fr

  8. Self-reliance and innovation to improve the localization ability of nuclear power construction

    International Nuclear Information System (INIS)

    Wu Chongming

    2008-01-01

    Construction is a crucial link in the course of design, site selection, construction and operation for a nuclear power plant. The quality during construction directly affects the nuclear safety. And the construction quality involves various aspects including quality culture, feasibility of construction technique, quality assurance, and quality control. Through technical management innovation, great achievements have been made in the civil construction of Unit 3 of Qinshan II Extension Project. As a result, the construction period was shortened and the concrete quality reached the fairfaced concrete standard. (authors)

  9. Analysis of nuclear power plant construction costs

    International Nuclear Information System (INIS)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs

  10. Analysis of nuclear power plant construction costs

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

  11. Peer Assessment for Construction Management and Quantity Surveying Students

    Directory of Open Access Journals (Sweden)

    Patricia McLaughlin

    2012-11-01

    Full Text Available Students undertaking the Bachelor of ConstructionManagement degree course at RMIT University, Melbourne,qualify for registration with the Australian Institute ofQuantity Surveyors (AIQS and the Australian Institute ofBuilding (AIB upon graduation. Over the past decade thedegree course has been constantly upgraded and altered inline with recommendations from professional bodies such asthese and other industry partners. In 1994 the Departmentof Building and Construction Economics re-assesseda range of subjects including the first year technologysubjects. Out of the review a problem-based integratedlearning unit was developed and tested. This unit has nowbeen in place for ten years.Quantity surveying and construction management likemost other professions in the construction industryrequire teamwork and advanced consultation skills. Theseskills may be learnt through experience but there isconsiderable evidence that these skills can be taught in theundergraduate years. Therefore in line with team-basedapproaches used in industry and professional constructionsettings, this year a new assessment model - peerassessment - will be applied to the problem-based learningunit. This paper describes the procedures and processesused to introduce the change and examines the theoreticalbase upon which the model was developed.

  12. Estimation of wind erosion from construction of a railway in arid Northwest China

    Directory of Open Access Journals (Sweden)

    Benli Liu

    2017-06-01

    Full Text Available A state-of-the-art wind erosion simulation model, the Wind Erosion Prediction System and the United States Environmental Protection Agency's AP 42 emission factors formula, were combined together to evaluate wind-blown dust emissions from various construction units from a railway construction project in the dry Gobi land in Northwest China. The influence of the climatic factors: temperature, precipitation, wind speed and direction, soil condition, protective measures, and construction disturbance were taken into account. Driven by daily and sub-daily climate data and using specific detailed management files, the process-based WEPS model was able to express the beginning, active, and ending phases of construction, as well as the degree of disturbance for the entire scope of a construction project. The Lanzhou-Xinjiang High-speed Railway was selected as a representative study because of the diversities of different climates, soil, and working schedule conditions that could be analyzed. Wind erosion from different working units included the building of roadbeds, bridges, plants, temporary houses, earth spoil and barrow pit areas, and vehicle transportation were calculated. The total wind erosion emissions, 7406 t, for the first construction area of section LXS-15 with a 14.877 km length was obtained for quantitative analysis. The method used is applicable for evaluating wind erosion from other complex surface disturbance projects.

  13. Siemens's spectrum of deliveries and services for nuclear power plants

    International Nuclear Information System (INIS)

    2011-01-01

    In 2001, Siemens and Framatome merged their nuclear activities in the present Areva NP joint venture. Siemens has since focused on the construction and further development of conventional power plants and on the so-called conventional island (CI), the non-nuclear part of a nuclear power plant, i.e. the steam turbine, generator, and plant I and C systems, and also on service for the conventional part of nuclear power plants. Its role as a minority shareholder in Areva NP constrained Siemens. For this reason, the company in January 2009 decided to terminate its interest in Areva NP effective January 30, 2012. By January 2012 at the latest, Siemens will transfer to the majority shareholder Areva, holding 66 percent of the shares, its interest in the joint venture. For the time being, the joint venture still entails certain limitations to Siemens's activities in the nuclear field. Its delivery of the conventional island for the Olkiluoto 3 (OL3) nuclear power plant in Finland confirms the company's know-how in power plant construction. When commissioned, its 1,720 MW power will make OL3 the world's largest nuclear generating unit. The turbo-generator of the CI comprises a double-flow HP turbine and a 6-flow LP turbine. The driven 4-pole generator with a power of up to 2,200 MVA consists of a water-cooled stator and a hydrogen-cooled rotor. (orig.)

  14. Bidding Strategy to Support Decision-Making Based on Comprehensive Information in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2016-01-01

    Full Text Available This paper develops a unified method to support contractor for bidding selection in construction projects. A cross-functional contractor with 28 candidate units distributed in the three departments (construction units, design units, and suppliers is used as an example. This problem is first formulated as a 0-1 quadratic programming problem through optimizing individual performance and collaborative performance of the candidate units based on individual information and collaborative information. Then, a multiobjective evolutionary algorithm is designed to solve this problem and a bidding selection problem for a major bridge project is used to demonstrate our proposed method. The results show that the decision-maker (DM obtains a better contractor if he pays more attention to collaborative performance.

  15. Organization of the construction and schedule of realization

    International Nuclear Information System (INIS)

    Szerovay, Antal; Vogel, Oszkar

    1988-01-01

    The four units of the Paks nuclear power plant with all the auxiliary and service facilities were constructed between 1974 and 1987. Major features of building activities, types of buildings classified according to the connection between the facility and the technology are listed. Processes and structures applied to the construction of the main reactor building are mentioned emphasizing the importance of up-to-date building methods. To move the large equipment into the reactor building Potain cranes of 400 Mp were used. As a result of adequate schedule the auxiliary buildings could be used as preparatory buildings during the construction of the plant. The energy and material supply, the schedule of the construction works are discussed. (V.N.) 6 refs.; 5 figs

  16. Building technology on construction site of nuclear power plant at Zaporozh'e

    Energy Technology Data Exchange (ETDEWEB)

    Dusek, R; Matyas, V [Vodni Stavby, Prague (Czechoslovakia)

    1981-12-01

    Basic data and technical and economic indexes are shown for a WWER 1000 nuclear power plant being built 120 km off Zaporozh'e (USSR). The schedule of construction and the choice of the means of mechanization used for building work are reported. Discussed are building machines used, the location of assembly cranes of the main unit, the design and the building technology of the reactor part, the engine house, deisel generator station, the special operations building, the use of concrete and steel units in the building, and the procurement of materials for the construction. The knowledge gained from the building of the power plant will be applied in the CSSR in the building of 1000 MW unit power plants.

  17. 12 CFR 410.151 - Program accessibility: New construction and alterations.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Program accessibility: New construction and alterations. 410.151 Section 410.151 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY EXPORT-IMPORT BANK OF THE UNITED...

  18. 48 CFR 1845.7101-3 - Unit acquisition cost.

    Science.gov (United States)

    2010-10-01

    ... production inventory and include programmed extra units to cover replacement during the fabrication process... ADMINISTRATION CONTRACT MANAGEMENT GOVERNMENT PROPERTY Forms Preparation 1845.7101-3 Unit acquisition cost. (a... production costs (for assets produced or constructed). (5) Engineering, architectural, and other outside...

  19. Inventing Wastewater: The Social and Scientific Construction of Effluent in the Northeastern United States

    Science.gov (United States)

    Brideau, J. M.; Ng, M.; Hoover, J. H.; Hale, R. L.; Thomas, B.; Vogel, R. M.; Northeast ConsortiumHydrologic Synthesis Summer Institute, 2010--Biogeochemistry

    2010-12-01

    Title: Inventing Wastewater: The Social and Scientific Construction of Effluent in the Northeastern United States Authors: Jeffrey Brideau, Melissa Ng, Joseph Hoover, Rebecca Hale, Brian Thomas, and Richard Vogel Presented by: Jeffrey Brideau B.A., M.A., PhD Candidate, Department of History, University of Maryland Regulation of pollution is a prevalent part of contemporary American society. Scientists and policy makers have established acceptable effluent thresholds, with the ostensible goal of protecting human and stream health. However, this ubiquity of regulation is a recent phenomenon, and institutional mechanisms for effluent control were virtually non-existent in the early 20th century. Nonetheless, these same decades witnessed the emergence of nascent efforts at water pollution abatement. This project aims to explore social and scientific perceptions of wastewater, and begins with the simple premise that socio-cultural values underlay human decision-making in water management, and that wastewater is imbued with a matrix of human values that are continuously renegotiated. So what were the primary motivations for abatement efforts? Were they aesthetic and olfactory, or scientific concern for public and stream health? This paper proposes that there are social as well as scientific thresholds for pollutant loads. Collaborating with a team of interdisciplinary researchers we have created and aggregated discrete data sets to model, using export coefficient and linear regression modeling techniques, historic pollutant loading in the Northeastern United States. Concurrently, we have drawn on historical narratives of agitation by abatement advocates, nuisance laws, regulatory regimes, and changing scientific understanding; and contrasting the modeling results with these narratives allows this project to quantitatively determine where social thresholds lay in relation to their scientific counterparts. This project’s novelty lies in its use of existing narratives of

  20. Country Report Summary: Japan [Project Management in Nuclear Power Plant Construction: Guidelines and Experience

    International Nuclear Information System (INIS)

    2012-01-01

    The Hokkaido Electric Power Company (HEPCO) is the owner of the Tomari NPP comprising three operating PWR units. The latest unit to be connected to the grid, Tomari Unit 3, is a 3-loop PWR power plant with an electric output of 912 MW(e) supplied by Mitsubishi Heavy Industries (MHI). This is the newest unit in HEPCO and it is the newest PWR unit in Japan as well. The first concrete at Tomari Unit 3 was poured at the end of summer in 2004. The unit entered into commercial operation in December 2009. The Tomari site is located on a northern Japanese island. It is battered by strong winds and receives much snow in the winter. Therefore, civil works and building construction were temporarily suspended every year from the beginning of December until the end of March. This increased construction duration by one year compared to other sites. Consequently from first concrete to the start of commercial operation construction at Tomari lasted 64 months. There are specific factors in the approach to construction of nuclear power plants in Japan. (1) Japanese legislation defines that the sole licensee must be the electric power company. This implies that the electric power company is responsible for the safety of the plant and in that capacity it must submit for approval the Safety Analysis Report (SAR) but it is also responsible for the design and reliability of the plant; hence it must also submit for approval the Construction Plan (CP), containing all necessary detailed design information. Consequently, the electric power company becomes the sole counterpart to the regulatory body on all aspects of the project. (2) All Japanese electric power companies are considerably large and have the tradition to do the engineering of their power plant themselves, and this not only for nuclear but also for conventional power plant. Therefore, the owner/utilities in Japan carry themselves the burden of major portions of the engineering, procurement and construction (EPC) of their NPPs

  1. The ACR: Advanced design features for a short construction schedule

    International Nuclear Information System (INIS)

    Elgohary, M.; Fairclough, N.

    2003-01-01

    Building on the successful CANDU construction at Qinshan, the ACR-700 is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. A project schedule of 48 months has been developed for the nth ACR unit with a 36 months construction period from First Concrete to Fuel Load. This paper describes some of the advanced design features implemented in the reactor building design in order to achieve this short construction period. These features include large volume concrete pours, prefabricated rebar, composite structures, prefabricated permanent formwork and significant modularization and prefabrication

  2. A study of identity construction in political discourse

    OpenAIRE

    Qaiwer, Shatha Naiyf

    2016-01-01

    This thesis interrogates the construction of identity and self-presentation strategies in the discourse of the current President of the United States of America, Barack Hussein Obama. The study seeks to answer questions about how the President constructs the various identities evident in his discourse, what kinds of resources are drawn upon, and how the resulting identities contribute to gain the support of the audience and the progression of political discourse in general. The present s...

  3. Design and construction of the ZEUS barrel calorimeter

    International Nuclear Information System (INIS)

    Repond, J.

    1990-01-01

    The mechanical design and construction techniques of the barrel calorimeter for the ZEUS detector are presented. The calorimeter uses alternate layers of depleted uranium and scintillator with one radiation length sampling. The unit cell has e/h = 1 which yields an optimal energy resolution for hadronic jets. We discuss the placing of the structural components and cracks between modules. Details of the construction and assembly effort needed to realize the total calorimeter are reported. 4 figs., 1 tab

  4. Construction and Quantification of the One Top model of the Fire Events PSA

    International Nuclear Information System (INIS)

    Kang, Dae Il; Lee, Yoon Hwan; Han, Sang Hoon

    2008-01-01

    KAERI constructed the one top model of the fire events PSA for Ulchin Unit 3 and 4 by using the 'mapping technique'. The mapping technique was developed for the construction and quantification of external events PSA models with a one top model for an internal events PSA. With 'AIMS', the mapping technique can be implemented by the construction of mapping tables. The mapping tables include fire rooms, fire ignition frequency, related initiating events, fire transfer events, and the internal PSA basic events affected by a fire. The constructed one top fire PSA model is based on previously conducted fire PSA results for Ulchin Unit 3 and 4. In this paper, we introduce the construction procedure and quantification results of the one top model of the fire events PSA by using the mapping technique. As the one top model of the fire events PSA developed in this study is based on the previous study, we also introduce the previous fire PSA approach focused on quantification

  5. 40 CFR 60.2992 - What is an existing incineration unit?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is an existing incineration unit... Times for Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Applicability of State Plans § 60.2992 What is an existing incineration unit? An existing incineration unit is...

  6. Scale model helps Duke untie construction snags

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    A nuclear power plant model, only 60 percent complete, has helped Duke Power identify over 150 major design interferences, which, when resolved, will help cut capital expense and eliminate scheduling problems that normally crop up as revisions are made during actual plant construction. The model has been used by construction, steam production, and design personnel to recommend changes that should improve material handling, operations, and maintenance procedures as well as simplifying piping and cabling. The company has already saved many man-hours in material take-off, material management, and detailed drafting and expects to save even more with greater use of, and improvement in, its modeling program. Duke's modeling program was authorized and became operational in November 1974, with the first model to be the Catawba Nuclear Station. This plant is a two-unit station using Westinghouse nuclear steam supply systems in tandem with General Electric turbine-generators, horizontal feedwater heaters, and Foster Wheeler triple pressure condensers. Each unit is rated 1142 MWe

  7. Design parameters for waste effluent treatment unit from beverages production

    OpenAIRE

    Mona A. Abdel-Fatah; H.O. Sherif; S.I. Hawash

    2017-01-01

    Based on a successful experimental result from laboratory and bench scale for treatment of wastewater from beverages industry, an industrial and efficient treatment unit is designed and constructed. The broad goal of this study was to design and construct effluent, cost effective and high quality treatment unit. The used technology is the activated sludge process of extended aeration type followed by rapid sand filters and chlorination as tertiary treatment. Experimental results have been con...

  8. A probabilistic model for US nuclear power construction times

    International Nuclear Information System (INIS)

    Shash, A.A.H.

    1988-01-01

    Construction time for nuclear power plants is an important element in planning for resources to meet future load demands. Analysis of actual versus estimated construction times for past US nuclear power plants indicates that utilities have continuously underestimated their power plants' construction durations. The analysis also indicates that the actual average construction time has been increasing upward, and the actual durations of power plants permitted to construct in the same year varied substantially. This study presents two probabilistic models for nuclear power construction time for use by the nuclear industry as estimating tool. The study also presents a detailed explanation of the factors that are responsible for increasing and varying nuclear power construction times. Observations on 91 complete nuclear units were involved in three interdependent analyses in the process of explanation and derivation of the probabilistic models. The historical data was first utilized in the data envelopment analysis (DEA) for the purpose of obtaining frontier index measures for project management achievement in building nuclear power plants

  9. Prevailing Wage Regulations and School Construction Costs: Evidence from British Columbia.

    Science.gov (United States)

    Bilginsoy, Cihan; Philips, Peter

    2000-01-01

    Examines effects of prevailing wage laws on school construction costs, using final cost data from six British Columbia school districts. When controlling for factors such as construction business cycle, number of competitors, and school type, there was no significant unit cost change following the Skill Development and Fair Wage Policy Act.…

  10. Construction of Belene NPP in Bulgaria

    International Nuclear Information System (INIS)

    JSC Atomstroyexport

    2010-01-01

    Presentations concluding remarks: ASE has performed its scope of responsibilities under the Agreement of 29.11.2006 and has achieved great results regarding both the Technical part of the Project and its organization; Though there is a number of unsettled issues under the Project, in particular, the issue related to financing, ASE is willing to continue the Project and works on its development; The Russian Party believes that in case the activities under the Project are continued, Belene NPP will be constructed with high quality and within the time limits prescribed in the Agreement of 29.11.2006: 59 months before Unit 1 take-over into operation and 71 month before Unit 2 take-over into operation, starting from concreting of foundation slab of Unit 1 Reactor building

  11. Construction/Communication & Media. B5. CHOICE: Challenging Options in Career Education.

    Science.gov (United States)

    Putnam and Northern Westchester Counties Board of Cooperative Educational Services, Yorktown Heights, NY.

    The documents aggregated here comprise the fourth grade unit of a career education curriculum for migrant students. The unit focuses on the tools and tasks of workers in 11 jobs in the construction, communication, and media occupational clusters: heavy equipment operator, architect, mason, carpenter, plumber, electrician, telephone line worker,…

  12. Data-driven weights and restrictions in the construction of composite indicators

    Directory of Open Access Journals (Sweden)

    Ana Perišić

    2015-03-01

    Full Text Available Composite indicators are increasingly recognized as a useful tool in policy analysis and public communication. However, if poorly constructed, they can send misleading policy messages. Perhaps the most difficult aspect of constructing a composite indicator is choosing weights for the components. The categorization of Croatian territorial units for development policy is based on the value of the composite indicator called the development index. The main goal of this paper is to propose an empirical approach for weight selection. In order to generate the set of non-subjective weights, principal component analysis and linear programming methods have been applied. An application of data envelopment analysis to the field of composite indicators, known as the Benefit-of-the-Doubt approach, has been demonstrated subject to proportional sub-indicator share restrictions. Additionally, the Monte Carlo simulation of weights was conducted, and confidence intervals for the values of the development index were estimated. Owing to the fact that the examined weighting schemes have resulted in the different categorization of territorial units, use of unit-specific weights and incorporating uncertainty in the construction of a composite indicator looks promising for further work.

  13. Forecasting manpower requirements for nuclear power plant construction

    International Nuclear Information System (INIS)

    Seltzer, N.; Schriver, W.R.

    1978-01-01

    This paper presents both the methodology and results of a segment of a comprehensive construction manpower demand forecasting system aimed at forecasting virtually all construction manpower requirements in the United States of America. The part of the system dealing with the demand for construction workers needed to build nuclear powered electricity generating plants is discussed here. The object of the system is to forecast manpower construction needs for each of 29 construction crafts on a monthly basis in each of 10 geographical regions of the United States. The method used is to establish profiles of the types of workers and time phasing required in the past. Profiling was done for different types of plants, different capacity classes, and different geographical locations. An appropriate worker profile matrix cannot simply be multiplied by the capacity of the proposed plant if the number of man-hours required per kilowatt of generating capacity is not constant. The value of this latter variable has changed considerably recently - presumably because of an increased awareness of environmental and safety considerations. Econometric techniques are used to forecast values for man-hours per kilowatt which are then multiplied by projected new capacity to be put in place. The resulting total man-hour requirement is then allocated over time and by craft through use of a worker profile matrix. The summary results indicate that 20 percent increases in man-hours required per kilowatt of capacity can be expected between 1977 and 1981. Total construction labour demand will rise from 65,700 work-years in 1977 to nearly 96,600 work-years in 1981. Forecasts of the actual number of different types of workers to be demanded in each month and in each region are available from the system. (author)

  14. About choosing the power unit of NPP

    International Nuclear Information System (INIS)

    Alekseev, P.N.; Mordashev, V.M.; Proshkin, A.A.; Stukalov, V.A.; Subbotin, S.A.; Tsibul'skij, V.F.; Chernilin, Yu.F.

    2008-01-01

    The present-day domestic nuclear power industry faces the necessity to make both process and economy related decisions. The mentioned decisions should cover all the aspects of the nuclear power complex. In particular, as of now, no substantiation of the present-day and the future requirements for the power unit of the WWER and fast reactor NPPs is available. The choice of the unit power of an NPP should involve consideration of all factors and should not be boiled down to the efforts to ensure the minimization of the investment and the operation constituents of the electric power generation costs. The aim of the present paper was to ensure elaboration of the recommendations to substantiate the optimal unit power of NPP power units based on the analysis of various factors to design, to construct and to operate an NPP (investment, time of construction, the unscheduled shutdown losses, the unification, the fabrication quality, the accident damage, etc.), and the electrical network potentialities and the regional electric power demands [ru

  15. Draft environmental statement related to construction of Yellow Creek Nuclear Plant, Units 1 and 2: (Docket Nos. STN 50-566 and STN 50-567)

    International Nuclear Information System (INIS)

    1977-06-01

    The proposed action is the issuance of construction permits to the Tennessee Valley Authority for the construction of the Yellow Creek Nuclear Plant Units 1 and 2. The 470-hectare site is predominantly wooded. Construction-related activities on the site would disturb about 59 hectares. The portion of this land not to be used for plant facilities, parking lots, roads, etc., will be restored by seeding and landscaping. The temporary removal of vegetation will tend to promote erosion. Increased siltation and turbidity can be expected in the Yellow Creek embayment during construction, but measures will be taken to minimize these effects. A maximum of 237.6 m 3 /min of make-up water will be withdrawn from the Yellow Creek embayment, of which 106 m 3 /min will be returned to Pickwick Lake via a pipeline with the dissolved solids concentration increased by a factor of about two. About 106 m 3 /min will be evaporated to the atmosphere by the cooling towers. The volume of thermal discharge (106 m 3 /min) is small compared with the flow in Pickwick Lake (minimum daily average flow of 7812 m 3 /min) and the effect on the Pickwick Lake ecosystem is not expected to be significant. During periods of average flow the plant could use about 24% of the flow through Yellow Creek embayment. Chemical discharges (with the possible exception of copper) from the plant will be diluted to concentrations below those which might adversely affect aquatic biota. The risk associated with accidental radiation exposure will be very low. 42 figs., 100 tabs

  16. Innovation in civil construction system of nuclear power plant

    International Nuclear Information System (INIS)

    Takami, Masahiro

    1996-01-01

    Nowadays, the computer-aided production systems have been already introduced to almost all kinds of industries. The construction industry, which has been said to be conservative for the modernization of production system, now expects the CIC (Computer Integrated Construction) as the means to innovate the construction production process. Shimizu Corporation has developed the new computer-aided production system, 'SIPS: Shimizu Integrated Production System', and has used it in the actual construction projects. In the system, the computer supports every phase of construction projects like market researching, design, material purchase, construction work, and maintenance. The project of Kashiwazaki-kariwa Nuclear Power Station Unit No.7 is one of the model cases. Here we applied following three concepts, (1) the full use and integration of 3D-CAD data-base through all phases of construction, (2) the setting-up of the information network system among the site office, the head office, and the mechanical and electrical manufacturer, (3) the introduction of advanced construction technologies such as large block prefabrication method. (author)

  17. Construction experiences from underground works at Forsmark. Compilation Report

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Anders [Vattenfall Power Consultant AB, Stockholm (Sweden); Christiansson, Rolf [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)

    2007-02-15

    The main objective with this report, the Construction Experience Compilation Report (CECR), is to compile experiences from the underground works carried out at Forsmark, primarily construction experiences from the tunnelling of the two cooling water tunnels of the Forsmark nuclear power units 1, 2 and 3, and from the underground excavations of the undersea repository for low and intermediate reactor waste, SFR. In addition, a brief account is given of the operational experience of the SFR on primarily rock support solutions. The authors of this report have separately participated throughout the entire construction periods of the Forsmark units and the SFR in the capacity of engineering geologists performing geotechnical mapping of the underground excavations and acted as advisors on tunnel support; Anders Carlsson participated in the construction works of the cooling water tunnels and the open cut excavations for Forsmark 1, 2 and 3 (geotechnical mapping) and the Forsmark 3 tunnel (advise on tunnel support). Rolf Christiansson participated in the underground works for the SFR (geotechnical mapping, principal investigator for various measurements and advise on tunnel support and grouting). The report is to a great extent based on earlier published material as presented in the list of references. But it stands to reason that, during the course of the work with this report, unpublished notes, diaries, drawings, photos and personal recollections of the two authors have been utilised in order to obtain such a complete compilation of the construction experiences as possible.

  18. Construction experiences from underground works at Forsmark. Compilation Report

    International Nuclear Information System (INIS)

    Carlsson, Anders; Christiansson, Rolf

    2007-02-01

    The main objective with this report, the Construction Experience Compilation Report (CECR), is to compile experiences from the underground works carried out at Forsmark, primarily construction experiences from the tunnelling of the two cooling water tunnels of the Forsmark nuclear power units 1, 2 and 3, and from the underground excavations of the undersea repository for low and intermediate reactor waste, SFR. In addition, a brief account is given of the operational experience of the SFR on primarily rock support solutions. The authors of this report have separately participated throughout the entire construction periods of the Forsmark units and the SFR in the capacity of engineering geologists performing geotechnical mapping of the underground excavations and acted as advisors on tunnel support; Anders Carlsson participated in the construction works of the cooling water tunnels and the open cut excavations for Forsmark 1, 2 and 3 (geotechnical mapping) and the Forsmark 3 tunnel (advise on tunnel support). Rolf Christiansson participated in the underground works for the SFR (geotechnical mapping, principal investigator for various measurements and advise on tunnel support and grouting). The report is to a great extent based on earlier published material as presented in the list of references. But it stands to reason that, during the course of the work with this report, unpublished notes, diaries, drawings, photos and personal recollections of the two authors have been utilised in order to obtain such a complete compilation of the construction experiences as possible

  19. Biological Cr(VI) removal using bio-filters and constructed wetlands.

    Science.gov (United States)

    Michailides, Michail K; Sultana, Mar-Yam; Tekerlekopoulou, Athanasia G; Akratos, Christos S; Vayenas, Dimitrios V

    2013-01-01

    The bioreduction of hexavalent chromium from aqueous solution was carried out using suspended growth and packed-bed reactors under a draw-fill operating mode, and horizontal subsurface constructed wetlands. Reactors were inoculated with industrial sludge from the Hellenic Aerospace Industry using sugar as substrate. In the suspended growth reactors, the maximum Cr(VI) reduction rate (about 2 mg/L h) was achieved for an initial concentration of 12.85 mg/L, while in the attached growth reactors, a similar reduction rate was achieved even with high initial concentrations (109 mg/L), thus confirming the advantage of these systems. Two horizontal subsurface constructed wetlands (CWs) pilot-scale units were also built and operated. The units contained fine gravel. One unit was planted with common reeds and one was kept unplanted. The mean influent concentrations of Cr(VI) were 5.61 and 5.47 mg/L for the planted and unplanted units, respectively. The performance of the planted CW units was very effective as mean Cr(VI) removal efficiency was 85% and efficiency maximum reached 100%. On the contrary, the unplanted CW achieved very low Cr(VI) removal with a mean value of 26%. Both attached growth reactors and CWs proved efficient and viable means for Cr(VI) reduction.

  20. Case study of the effects of public safety regulation on the construction costs of coal-fired and nuclear power plants

    International Nuclear Information System (INIS)

    Morris, C.D.

    1987-01-01

    Regulations intended to reduce the number of accidents at nuclear plants and the discharge of sulfur and particulate wastes at coal-fired power plants have become an important cause of construction cost escalation. Measuring the costs of these regulatory interventions is a difficult research task. The three-unit Bruce Mansfield coal-fired plant and the two-unit Beaver Valley nuclear power station located in Shippingport, Pennsylvania, provide a unique opportunity for a case study of the costs of regulation in the construction of both kinds of plants. The units of each plant were built sequentially over a period of intensifying regulation. The method used to measure the costs of public safety regulation in the construction of each kind of plant is to determine the connections between the issuances of the regulatory agencies (EPA and NRC) and cost escalations of succeeding units. The small cost escalations of the Mansfield 3 unit, in comparison to the massive costs of the Beaver Valley 2 unit, suggest that the design and construction of new coal-fired plants are not disrupted by regulatory interventions nearly as extensively as are nuclear units. Certain technical features of Beaver Valley 2, especially its small size and a design that is identical to the first unit's, further contribute to its cost escalations

  1. Social science constructs in ecosystem assessments: revisiting community capacity and community resiliency.

    Science.gov (United States)

    Ellen M. Donoghue; Victoria E. Sturtevant

    2007-01-01

    This article explores the development of sociological constructs in community assessment components of large-scale ecosystem assessments. We compare the conceptual and operational development of the constructs of community capacity and community resiliency used in three community assessments in the western United States: the Forest Ecosystem Management Assessment Team...

  2. The performance-competence interplay in the [V until ADJ]-construction

    DEFF Research Database (Denmark)

    Jensen, Kim Ebensgaard

    in which grammatical constructions are considered meaningful symbolic units on par with lexemes, in relation to the [V until ADJ]-construction, as seen in the following examples: (1) Meanwhile, grill onions until soft. (2) Stir frequently until fragrant. (3) Microwave milk on High 2 minutes or until warm...

  3. Optimization of design and erection methods to minimize the construction time-schedule of EPR plants

    International Nuclear Information System (INIS)

    Pierrat, Michel; L'Huby, Yvan; Decelle, Alain

    1999-01-01

    This paper presents the results of the investigations made during the Basic Design of the EPR project (European Pressurized water Reactor) to shorten the construction schedule. A 57 months construction schedule can be reached for the first unit. The investigations concern both design and construction methods. (author)

  4. Experience from the construction and operation of Tarapur and Rajasthan Nuclear Power Stations

    International Nuclear Information System (INIS)

    Shah, J.C.; Pardiwala, T.F.; Kothare, V.V.; Rao, M.H.P.; Nanjundeswaran, K.

    1977-01-01

    India's experience in construction and operation of nuclear power stations so far covers two BWR and four PHWR Units in three power stations. Two more PHWR units are at an early stage of construction. The twin unit Tarapur Station (2x210 MWe BWR) was built as a turnkey project which restricted participation of Indian engineers in design and construction considerably. The contrasting approach adopted for Rajasthan Station (2x220 MWe PHWR) involved Indian personnel and contractors fully in construction and commissioning, with Canadians providing supervisory assistance in Rajasthan I and essentially consultative help for Rajasthan II. Subsequent stations are wholly Indian efforts. Tarapur went into commercial operation in 1969, 60 months after breaking of ground. Construction was essentially uneventful, major problems faced being stress corrosion induced cracks in the reactor lining and complete change of steam generator tubes. In its seven years of operations, Tarapur has faced several problems mainly arising from rather early designs, indifferent fuel performance, constraints of twin-unit approach and operations in an inadequately developed grid system apart from those generally stemming from assimilation of an advanced technology in a developing country. The Station has undergone six refuellings during this period. Most of the problems have been overcome by design changes, system augmentations and experience and the Station operation since mid 1974 have generally been steady at around 90% of the rated capacity. Construction of Rajasthan I at a remote and isolated site proceeded relatively slowly. Local availability of skilled and semi-skilled manpower was poor, affecting construction. Inadequate roads impeded movements of overdimensioned components. Observing strict Quality Assurance standards required several major rectifications at site. Rajasthan I went on line in 1973 after overcoming major turbine bearing problems during commissioning. Since then, while

  5. The impact of project management on nuclear construction lead times

    International Nuclear Information System (INIS)

    Radlaver, M.A.; Bauman, D.S.; Chapel, S.W.

    1985-01-01

    A two-year study of lead times for nuclear power plants found that construction time is affected by six fundamental influences. One of the six is project management. An analysis of construction management teams at 26 nuclear units found that many of the most successful shared five general characteristics: nuclear power experience, skill in project control, adaptability and initiative, commitment to success, and communication and coordination skill

  6. Labour input in construction of composite structures of the Balakovo NPP reactor compartment

    International Nuclear Information System (INIS)

    Alasyuk, G.Ya.

    1988-01-01

    Technical-economical results achieved when constructing the Balakovo NPP second unit reactor compartment structures are presented. The obtained data analysis shows that in the case of building the walls of non-sealed reactor compartment section in the form of composite structures the major part of labour input requirements (54-59%) falls at works on production and mounting of these structures, performed at auxiliary plants. Labour input for works performed the construction (unit-cell and space frame mounting, preparation of units for concreting, joint sealing, concrete placement) make up 41-46%, and labour input for enlarged unit-cell mounting make up 8%. Labour input per 1 m 3 of the wall structure with 0.6 and 0.9 m thicness in the monolith option are respectively by 19 an 23% higher than the same indices for composite

  7. Tips for cleanroom construction and renovation.

    Science.gov (United States)

    Mixon, William; Huffman, Lanny

    2009-01-01

    The installation or renovation of a cleanroom is an increasing priority among compounders who, to offer sterile preparations, must comply with the most recent version of United States Pharmacopeia revised General Chapter 797 guidelines. To upgrade their pharmacy facilites, many compounders have worked successfully with a large-scale mechanical engineering firm or a specialized construction company dedicated to cleanroom installation. However, a qualified local mechanical contractor with design capability is a valuable and often overlooked resource for the construction of customized stae-of-the-art cleanrooms. In this report, we describe the installation of such a facility in a busy pharmacy and suggest ways in which compounding pharmacists can identify competent local contractors and control the cost of construction and upgrades. The addition of a cleanroom has enabled The Compounding Pharmacy in Hickory, North Carolina, to achieve accreditation from the Pharmacy Compounding Accreditation Board.

  8. Economics of residential gas furnaces and water heaters in United States new construction market

    OpenAIRE

    Lekov, Alex B.

    2009-01-01

    New single-family home construction represents a significant and important market for the introduction of energy-efficient gas-fired space heating and water-heating equipment. In the new construction market, the choice of furnace and water-heater type is primarily driven by first cost considerations and the availability of power vent and condensing water heaters. Few analysis have been performed to assess the economic impacts of the different combinations of space and water-heating equipment....

  9. Safety evaluation report related to the construction of Skagit/Hanford Nuclear Project, Units 1 and 2. Docket Nos. STN 50-522 and 50-523

    International Nuclear Information System (INIS)

    1982-12-01

    Supplement 3 to the Safety Evaluation Report for the application filed by Puget Sound Power and Light Company on behalf of itself, the Pacific Power and Light Company, The Washington Water Power Company, and the Portland General Electric Company for construction permits to build the Skagit/Hanford Nuclear Project has been issued by the Office of Nuclear Reactor Regulation of the United States Nuclear Regulatory Commission. This supplement is an evaluation of the site relocation amendment to the Preliminary Safety Analysis Report. The proposed site has been relocated from Skagit County, Washington, to the Department of Energy's Hanford Reservation

  10. Karl Marx, Ludwig Wittgenstein, and Black Underachievement in the United States and United Kingdom

    Science.gov (United States)

    Tomlin, Carol; Wright, Cecile; Mocombe, Paul C.

    2013-01-01

    This article synthesizes Marxian conceptions of identity construction within capitalist relations of production with the Wittgensteinian notion of "language games" to offer a more appropriate relational framework within which scholars ought to understand the Black-White academic achievement gap in America, the United Kingdom, and…

  11. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2002-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 425, Area 9 Main Lake Construction Debris Disposal Area. This CAU is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996). This site will be cleaned up under the SAFER process since the volume of waste exceeds the 23 cubic meters (m(sup 3)) (30 cubic yards[yd(sup 3)]) limit established for housekeeping sites. CAU 425 is located on the Tonopah Test Range (TTR) and consists of one Corrective Action Site (CAS) 09-08-001-TA09, Construction Debris Disposal Area (Figure 1). CAS 09-08-001-TA09 is an area that was used to collect debris from various projects in and around Area 9. The site is located approximately 81 meters (m) (265 feet[ft]) north of Edwards Freeway northeast of Main Lake on the TTR. The site is composed of concrete slabs with metal infrastructure, metal rebar, wooden telephone poles, and concrete rubble from the Hard Target and early Tornado Rocket sled tests. Other items such as wood scraps, plastic pipes, soil, and miscellaneous nonhazardous items have also been identified in the debris pile. It is estimated that this site contains approximately 2280 m(sup 3) (3000 yd(sup 3)) of construction-related debris

  12. Heysham 2

    International Nuclear Information System (INIS)

    1985-01-01

    Heysham 2 power station, which is being built near Morecombe on the north west coast of England by the Central Electricity Generating Board (CEGB) will be the fifth nuclear power station of the British designed Advanced gas cooled reactor type (AGR). When fully operational in the late 1980s the station's two 660 megawatt turbo-generators will be capable of supplying the electricity to a large industrial city. This brochure, which has been designed by Public Relations for the CEGB, explains briefly the siting, planning history, contract responsibilities and construction. A brief account of the AGR design is given followed by a description of some of the main components. The text is illustrated with colour photographs and diagrams. The technical details are listed. (U.K.)

  13. 40 CFR 60.2885 - Does this subpart apply to my incineration unit?

    Science.gov (United States)

    2010-07-01

    ... incineration unit? 60.2885 Section 60.2885 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... for Other Solid Waste Incineration Units for Which Construction is Commenced After December 9, 2004....2885 Does this subpart apply to my incineration unit? Yes, if your incineration unit meets all the...

  14. 40 CFR 60.2010 - Does this subpart apply to my incineration unit?

    Science.gov (United States)

    2010-07-01

    ... incineration unit? 60.2010 Section 60.2010 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... for Commercial and Industrial Solid Waste Incineration Units for Which Construction Is Commenced After... Applicability § 60.2010 Does this subpart apply to my incineration unit? Yes, if your incineration unit meets...

  15. 40 CFR 60.1015 - What is a new municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... combustion unit? 60.1015 Section 60.1015 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999... What is a new municipal waste combustion unit? (a) A new municipal waste combustion unit is a municipal...

  16. A Tubular Biomaterial Construct Exhibiting a Negative Poisson's Ratio.

    Directory of Open Access Journals (Sweden)

    Jin Woo Lee

    Full Text Available Developing functional small-diameter vascular grafts is an important objective in tissue engineering research. In this study, we address the problem of compliance mismatch by designing and developing a 3D tubular construct that has a negative Poisson's ratio νxy (NPR. NPR constructs have the unique ability to expand transversely when pulled axially, thereby resulting in a highly-compliant tubular construct. In this work, we used projection stereolithography to 3D-print a planar NPR sheet composed of photosensitive poly(ethylene glycol diacrylate biomaterial. We used a step-lithography exposure and a stitch process to scale up the projection printing process, and used the cut-missing rib unit design to develop a centimeter-scale NPR sheet, which was rolled up to form a tubular construct. The constructs had Poisson's ratios of -0.6 ≤ νxy ≤ -0.1. The NPR construct also supports higher cellular adhesion than does the construct that has positive νxy. Our NPR design offers a significant advance in the development of highly-compliant vascular grafts.

  17. Individual and collective processes in the construction of the self: self-enhancement in the United States and self-criticism in Japan.

    Science.gov (United States)

    Kitayama, S; Markus, H R; Matsumoto, H; Norasakkunkit, V

    1997-06-01

    A collective constructionist theory of the self proposes that many psychological processes, including enhancement of the self (pervasive in the United States) and criticism and subsequent improvement of the self (widespread in Japan), result from and support the very ways in which social acts and situations are collectively defined and subjectively experienced in the respective cultural contexts. In support of the theory, 2 studies showed, first, that American situations are relatively conducive to self-enhancement and American people are relatively likely to engage in self-enhancement and, second, that Japanese situations are relatively conducive to self-criticism and Japanese people are relatively likely to engage in self-criticism. Implications are discussed for the collective construction of psychological processes implicated in the self and, more generally, for the mutual constitution of culture and the self.

  18. Modernization and power increase nuclear power plant Laguna Verde (Mexico)

    International Nuclear Information System (INIS)

    Garcia-Serrano, J. L.; Merino, A.; Ruiz Gutierrez, L.

    2011-01-01

    The objective of this project is to perform the modifications on the thermal cycle of the plant required by an Extended Power Uprate, to achieve a safe and reliable operation of the plant at 120% of its original thermal power. The scope includes the design, engineering training, supply of equipment, dismantling, installation, testing and commissioning. The duration of the project is 4 years (82007-2010), and all the modifications have been implemented in four outages, two per unit. The main modification carried out are the change of the condenser, moisture separator and main steam reheaters, the feedwater haters, the turbogenerator and its auxiliaries, transformers, isolated phase bus and main circuit breaker, etc. (Author)

  19. Modernization and power increase nuclear power plant Laguna Verde (Mexico); Modernizacion y aumento de potencia de la central nuclear Laguna Verde (Mexico)

    Energy Technology Data Exchange (ETDEWEB)

    Garcia-Serrano, J. L.; Merino, A.; Ruiz Gutierrez, L.

    2011-07-01

    The objective of this project is to perform the modifications on the thermal cycle of the plant required by an Extended Power Uprate, to achieve a safe and reliable operation of the plant at 120% of its original thermal power. The scope includes the design, engineering training, supply of equipment, dismantling, installation, testing and commissioning. The duration of the project is 4 years (82007-2010), and all the modifications have been implemented in four outages, two per unit. The main modification carried out are the change of the condenser, moisture separator and main steam reheaters, the feedwater haters, the turbogenerator and its auxiliaries, transformers, isolated phase bus and main circuit breaker, etc. (Author)

  20. Assessing problem-solving skills in construction education with the virtual construction simulator

    Science.gov (United States)

    Castronovo, Fadi

    problem-solving skills, a new version of the VCS(4) was developed, with new building modules and assessment framework. The design and development of the VCS4 leveraged research in educational psychology, multimedia learning, human-computer interaction, and Building Information Modeling. In this dissertation the researcher aimed to evaluate the pedagogical value of the VCS4 in fostering problem-solving skills. To answer the research questions, a crossover repeated measures quasi-experiment was designed to assess the educational gains that the VCS can provide to construction education. A group of 34 students, attending a fourth-year construction course at a university in the United States was chosen to participate in the experiment. The three learning modules of the VCS were used, which challenged the students to plan and manage the construction process of a wooden pavilion, the steel erection of a dormitory, and the concrete placement of the same dormitory. Based on the results the researcher was able to provide evidence supporting the hypothesis that the chosen sample of construction students were able to gain and retain problem-solving skills necessary to solve complex construction simulation problems, no matter what the sequence with which these modules were played. In conclusion, the presented results provide evidence supporting the theory that educational simulation games can help the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems.

  1. Interfacing between concrete and steel construction and fusion research devices

    International Nuclear Information System (INIS)

    Willoughby, E.

    1981-01-01

    In 1976 Giffels Associates, Inc. an architect/engineer organization, was retained by the United States Department of Energy to provide Title I and Title II design services and Title III construction inspection services for the Tokamak Fusion Test Reactor now being installed at the Princeton Plasma Physics Laboratory in Princeton, New Jersey. Construction of the complex required to house and serve the reactor itself, designed by others, now commencing. During building construction several problems occurred with respect to the interface between the building design, construction and the fusion device (reactor). A brief description of some of these problems and related factors is presented, which may be of benefit to those persons active in continuing fusion research and experimental work

  2. Infection control in design and construction work.

    Science.gov (United States)

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  3. 78 FR 77334 - Small Business Size Standards: Construction

    Science.gov (United States)

    2013-12-23

    ... enrollment in the System of Award Management's (SAM) Dynamic Small Business Search database, and more firms... SMALL BUSINESS ADMINISTRATION 13 CFR Part 121 RIN 3245-AG37 Small Business Size Standards: Construction AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: The United States Small...

  4. Managing engineering to meet construction requirements

    International Nuclear Information System (INIS)

    Martin, D.F.; Houchen, J.D.

    1976-01-01

    The San Onofre Units 2 and 3 Project schedule is compared with Bechtel's Generic Nuclear Power Plant schedule. This comparison shows that the major delays experienced on the San Onofre Project have resulted from the regulatory process. To date, Engineering has met Construction's requirements and the Project has not experienced any Engineering related delays. The San Onofre Project has been faced with many uncertainties, such as limited site area, high seismic design criteria, new and changing Federal and State regulations, shifts in supplier market conditions and unpredictable supplier performance. Each of these uncertainties has impacted the Engineering effort and jeopardized project schedule goals. The SCE-Bechtel Engineering Management team has acted to mitigate the impact of these uncertainties through use of a cost trend program, simplification of SCE-Bechtel interfaces, close Engineering-Construction coordination, the use of task forces to handle critical supplier problems and the use of additional Engineering personnel, etc. so that Construction requirements have been met

  5. Life cycle assessment of construction and demolition waste management

    DEFF Research Database (Denmark)

    Butera, Stefania; Christensen, Thomas Højlund; Astrup, Thomas Fruergaard

    2015-01-01

    Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed...... of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most...... of the impact assessment was critical for modelling the leaching impacts. Compared with the overall life cycle of building and construction materials, leaching emissions were shown to be potentially significant for toxicity impacts, compared with contributions from production of the same materials, showing...

  6. Design and construction of the Portable Industrial X-Ray Equipment

    International Nuclear Information System (INIS)

    Nguyen Phuc; Nguyen Van Si; Le Tien Quan; Trinh Anh Tuan; Nguyen Manh Hung; Trinh Dinh Tuong

    2011-01-01

    The main purposes of the project are the supporting to design and construction of the Portable Industrial X-Ray Equipment; with the accuracy ±2% of Output High Voltage 200 kV and Tube current 5 mA. The Equipment is composed of control unit, X-ray generator, and power cable, connection cable. X-ray generator is assembling construction X-ray tube, H.V transformer together with gas insulation (SF6) are sealed up in aluminum bucked cabinet, fan and heat-sink are mounted in the end of X-ray generator as cooling, SF6 is a gas electrical performance to H.V. Alarm lamp is used to warn, flashing, show generating X-ray. Control unit is box construction. Four printed circuit boards (PCB) and electronic device are mounted in it. All operating buttons switches and displays are equipped on the panel. We have completed to design and construct the Portable Industrial X-Ray Equipment; and have tested the electronic parameters of all test points and the main parameters of equipment (the accuracy ±2% of Output High Voltage 200 kV and Tube current 5 mA). We also have successful used the Portable Industrial X-Ray Equipment to evaluate the welds in industry. (author)

  7. Economics of residential gas furnaces and water heaters in United States new construction market

    Energy Technology Data Exchange (ETDEWEB)

    Lekov, Alex B.; Franco, Victor H.; Wong-Parodi, Gabrielle; McMahon, James E.; Chan, Peter

    2009-05-06

    New single-family home construction represents a significant and important market for the introduction of energy-efficient gas-fired space heating and water-heating equipment. In the new construction market, the choice of furnace and water-heater type is primarily driven by first cost considerations and the availability of power vent and condensing water heaters. Few analysis have been performed to assess the economic impacts of the different combinations of space and water-heating equipment. Thus, equipment is often installed without taking into consideration the potential economic and energy savings of installing space and water-heating equipment combinations. In this study, we use a life-cycle cost analysis that accounts for uncertainty and variability of the analysis inputs to assess the economic benefits of gas furnace and water-heater design combinations. This study accounts not only for the equipment cost but also for the cost of installing, maintaining, repairing, and operating the equipment over its lifetime. Overall, this study, which is focused on US single-family new construction households that install gas furnaces and storage water heaters, finds that installing a condensing or power-vent water heater together with condensing furnace is the most cost-effective option for the majority of these houses. Furthermore, the findings suggest that the new construction residential market could be a target market for the large-scale introduction of a combination of condensing or power-vent water heaters with condensing furnaces.

  8. Análisis de la redundancia en la generación de vapor con parámetros inferiores en un monobloque de 64 MW // Analysis of redundancy in the steam generation with inferior parameters in an unit of 64 MW.

    Directory of Open Access Journals (Sweden)

    A. Paneque Matos

    2000-10-01

    use the boiler of one unit to feed the another one turbogenerator. In thepresent work, the corresponding calculations to determine the behavior of the turbine under the new imposed conditionsare shown, it was carried out an analysis of reliability of the proposed system using the simulation like a tool for modelingthe process.Key words: thermoelectric plant, reliability, efficiency, steam turbine, boiler.

  9. Power stations

    International Nuclear Information System (INIS)

    Cawte, H.; Philpott, E.F.

    1980-01-01

    The object is to provide a method of operating a dual purpose power station so that the steam supply system is operated at a high load factor. The available steam not required for electricity generation is used to provide process heat and the new feature is that the process plant capacity is determined to make the most economic use of the steam supply system, and not to match the passout capacity of the turbine of the turbogenerator. The product of the process plant should, therefore, be capable of being stored. A dual-purpose power station with a nuclear-powered steam source, turbogenerating means connected to the steam source and steam-powered process plant susceptible to wide variation in its rate of operation is described. (U.K.)

  10. Condition assessment and strengthening of residential units

    Directory of Open Access Journals (Sweden)

    Tatheer Zahra

    2014-01-01

    Full Text Available About 40, ground plus one (G+1 residential units were designed using a hybrid structural framing system (RC frame and load bearing walls. A few months after the completion of the ground floor of the residential units, cracks appeared at several locations in the structure. Field and Laboratory testing was conducted to ascertain the in situ strength of concrete and steel reinforcement. The results of the experimental work were used in the analytical ETABS model for the structural stability calculations. The results indicated that residential units were marginally safe in the existing condition (completed ground floor, but the anticipated construction of the floor above the ground floor (G+1 could not be carried out as the strength of the structural system was inadequate. To increase the safety of existing ground floor and to provide the option of the construction of one floor above, rehabilitation and strengthening design was performed. The proposed strengthening design made use of welded wire fabric (WWF and carbon fibre reinforced polymer (CFRP laminates/sheets for the strengthening of walls, columns and slabs. The residential units will be strengthened in the near future.

  11. UV-C 13-50 ultraviolet irradiation unit for surface sterilization

    International Nuclear Information System (INIS)

    Bachmann, R.

    1979-01-01

    Brown Boveri have developed new watertight ultraviolet irradiation units for surface sterilization. Their main application is in packing techniques in the foodstuffs and pharmaceutical industries. This article describes the construction, germicidal effect, and applications of these irradiation units. (Auth.)

  12. Construction Cluster Volume I [Wood Structural Framing].

    Science.gov (United States)

    Pennsylvania State Dept. of Justice, Harrisburg. Bureau of Correction.

    The document is the first of a series, to be integrated with a G.E.D. program, containing instructional materials at the basic skills level for the construction cluster. It focuses on wood structural framing and contains 20 units: (1) occupational information; (2) blueprint reading; (3) using leveling instruments and laying out building lines; (4)…

  13. Application of unscented Kalman filter for condition monitoring of an organic Rankine cycle turbogenerator

    DEFF Research Database (Denmark)

    Pierobon, Leonardo; Schlanbusch, Rune; Kandepu, Rambabu

    2014-01-01

    for this project. Considering the plant dynamics, it is of paramount importance to monitor the peak temperatures within the once-through boiler serving the bottoming unit to prevent the decomposition of the working fluid. This paper accordingly aims at applying the unscented Kalman filter to estimate...... the temperature distribution inside the primary heat exchanger by engaging a detailed and distributed model of the system and available measurements. Simulation results prove the robustness of the unscented Kalman filter with respect to process noise, measurement disturbances and initial conditions....

  14. Mitsubishi nuclear technologies and construction of new Bohunice

    International Nuclear Information System (INIS)

    Yoshizu, T.

    2009-01-01

    Mitsubishi Heavy Industries (MHI) has setup Generation III+ category power plant technologies both in large and middle size reactors as a key player in the global market of nuclear plant suppliers. MHI has developed 1,700 MWe class Advanced Pressurized Water Reactor for European utilities, EU-APWR, utilizing the APWR technology in Japan. The plant configuration is based on the proven technologies from MHI's ample experiences, but various advanced technologies are adopted to achieve enhanced safety, reliability, and economy. For the regions without large grid capacity, middle-sized nuclear power plant will be an attractive option for the utilities. Joint Venture ATMEA with AREVA NP will serve ATMEA1. The ATMEA1 will offer 1,100 MWe output with superior operation performance based on reliable and proven technologies. Mitsubishi has experience of half century for all of 26 PWR plants in Japan. The latest plant is Tomari Unit 3 of 1,000 MWe, which has completed the construction work and now in the final commissioning test. Tomari Unit 3 applies some advanced technologies such as all digital I and C, which are to be implemented in the EU-APWR. Based on this construction experience, Mitsubishi can contribute any kind of demands for New Bohunice 5 th unit project with the total engineering capability. (author)

  15. Mining for constructions in texts using N-gram and network analysis

    DEFF Research Database (Denmark)

    Shibuya, Yoshikata; Jensen, Kim Ebensgaard

    2015-01-01

    N-gram analysis to Lewis Carroll's novel Alice's Adventures in Wonderland and Mark Twain's novelThe Adventures of Huckleberry Finn and extrapolate a number of likely constructional phenomena from recurring N-gram patterns in the two texts. In addition to simple N-gram analysis, the following....... The main premise is that, if constructions are functional units, then configurations of words that tend to recur together in discourse are likely to have some sort of function that speakers utilize in discourse. Writers of fiction, for instance, may use constructions in characterizations, mind-styles, text...

  16. Longrun supply and demand of new residential construction in the United States: 1986 to 2040.

    Science.gov (United States)

    Claire A. Montgomery

    1989-01-01

    A model of U.S. housing demand and supply was developed that projects housing starts for use in long-term forest planning. Housing demand was shown to respond to the current sale price and the user capital cost of housing and to the size and age composition of the population. Current sale price is determined in the new construction market. Supply of new construction...

  17. Using Personal Construct Theory to Explore Self-Image with Adolescents with Learning Disabilities

    Science.gov (United States)

    Thomas, Samantha; Butler, Richard; Hare, Dougal Julian; Green, David

    2011-01-01

    A young person's construct of self can be fundamental to their psychological well being (Glick 1999; Emler 2001). However limited research has been conducted in the United Kingdom to explore self-image with adolescents with learning disabilities. Previous studies have demonstrated the effective use of personal construct theory with children…

  18. Construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Jicha, J.

    1989-01-01

    The Temelin nuclear power plant with four WWER-1000 reactors is designed to supply electricity in an amount of 23 TWh/yr and heat in an amount of 8000 TJ/yr in the first stage. The maximum heat extraction should be 922 MW. The plant construction includes the building of 10 buildings, the total cost being 52 thousand million Czechoslovak crowns. Another 41 investment items are associated with the plant construction. The most important of them include constructions for leading out the electric power, for standby electricity supply for the power plant, and for the extraction of heat from the plant and its supply to the town of Ceske Budejovice. The first unit should be started up for test performance in November 1992, the second in 1994 and the whole power plant should be complete by 1998. The state of the construction by February 1989 is described in detail. Attention is also paid to the preparatory activity for the operation and to social welfare of the personnel. (Z.M.)

  19. Computer aided construction engineering system for nuclear power plants

    International Nuclear Information System (INIS)

    Yoshinaga, Toshiaki; Nakajima, Akira; Miyahara, Ryohei; Miura, Jun

    1990-01-01

    The construction CAE system for nuclear power plants is the tool for the construction work simulator (procedure, processes and management simulation) connected to 3D-CAD (three-dimensional plant layout planning CAD). The data used for construction work simulation are registered in the data base as the installation smallest unit data from the 3D-CAD. This construction work simulator comprises the automatic installation procedure decision system, with which a construction planner decides installation procedure by using a high performance graphic work station, and based on a 3D-CAD model, utilizing empirical procedure logic, the dialogue system for making the installation procedure more optimal by utilizing effectively the graphic function, the evaluation system for synthetically evaluating workability, personnel plan and so on by adding the simulation of human behavior based on these procedures, the schedule system which carries out work process simulation based on the above, the data base system for letting to do these plans effectively and the project management system. By means of these, the plant construction of high quality is expected. (K.I.)

  20. Notions of Gender in the Construction of English.

    Science.gov (United States)

    Thomas, Kim

    1991-01-01

    Feminism and gender in the construction of English as a university discipline and the historical development of English are discussed. Generally, English is studied by women and taught by men. The teaching of English today is examined through interviews with four university English department lecturers in the United Kingdom. (SLD)

  1. Construction of extended exponential general linear methods 524 ...

    African Journals Online (AJOL)

    This paper introduces a new approach for constructing higher order of EEGLM which have become very popular and novel due to its enviable stability properties. This paper also shows that methods 524 is stable with its characteristics root lies in a unit circle. Numerical experiments indicate that Extended Exponential ...

  2. Parenting and the workplace: The construction of parenting protections in United States law

    OpenAIRE

    Eichner Maxine

    2008-01-01

    Abstract In this paper, I discuss the shortcomings of the legal protections that exist for pregnancy, breastfeeding, and parenting for United States' workers. The two main sources of protection for pregnancy and parenting in United States employment law are the Pregnancy Discrimination Act (PDA) and the Family and Medical Leave Act (FMLA). Both, I argue, contain inadequate protections for the needs of pregnant women and breastfeeding mothers, as well as their infants. I consider what it is ab...

  3. Advanced boiling water reactor (ABWR). Design, construction, operation and maintenance experience

    International Nuclear Information System (INIS)

    Idesawa, M.

    1998-01-01

    The ABWR has experienced all phases of design, construction, operation and maintenance at Kashiwazaki-Kariwa Nuclear Power Station Units No.6 and 7 and confirmed that originally intended development targets have been achieved with highly satisfactory results. This is the fruit of a project that collected wisdom from various sources under a international cooperative organization, with Tokyo Electric Power Company taking the leading role from the onset. These two units have not only demonstrated that ABWRs have superior performance as the first standard units of advanced light water reactor but also aroused a hope for the big potential advantages that ABWRs can provide us. The ABWR has already been awarded a U.S. standard license for having proved that it can comply with the requirements of international regulatory systems with an ample margin. There are also many construction programs with ABWRs progressing both domestically and abroad, suggesting that it has won recognition as an international standard plant. We will do our utmost to perfect the operation and maintenance records of Kashiwazaki-Kariwa Units No.6 and 7, which is the top runner among ABWRs, and to make known the superiority of this reactor to the world. (J.P.N.)

  4. Performance and competence in usage-based construction grammar

    DEFF Research Database (Denmark)

    Jensen, Kim Ebensgaard

    2014-01-01

    While formalist approaches in the Chomskian tradition to language distinguish sharply between performance and competence in their modeling of language competence, performance and competence are considered to be in a mutually influential relation in usage-based models of language. Language...... competence, in the latter approach, is, much like in Dell Hymes’ notion of communicative competence, held to be experientially based in the sense that speakers establish their competence through inductive social-cognitive processes of schematization and conventionalization. Making a case for the usage......-based definition of the language system, his paper explores the interplay between performance and competence in a construction grammar perspective in which grammatical constructions are considered meaningful symbolic units on par with lexemes, in relation to the [V until ADJ]-construction, based on a study...

  5. Construction Improvement for the Korean Nuclear Program

    International Nuclear Information System (INIS)

    Yang, T. E.

    1992-01-01

    Construction of the nine Nuclear plants requires an enormous financial investment. The decision to build a nuclear unit is based on both economic and resource requirements. Korea has few natural resources to use for power generation so the use of diversified fuel sources is a part of the planning process. Nuclear has historically had economic advantages over the fossil fueled plant, however, this advantage has been reduced. This is mainly due to increasing decommissioning and waste disposal costs plus the financial outlays associated with gaining public acceptance of new nuclear units. One of the principal means to recover the economic advantage of a nuclear plant is to shorten the time needed for construction. Every extra day of construction costs large sums of money in interest and escalation expenses alone. The challenge is to shorten the construction period to the minimum feasible time and thereby reduce the financing costs. The methods that have to be employed to achieve this goal require the total commitment from the management of all entities involved in the program. Through the application of advanced management and construction techniques a new era in the construction of nuclear plants in Korea will occur. This will include changes to the methods used for managing, planning, licensing, designing and constructing the new plants. The ability to meet the aggressive plan for the construction of new nuclear power plants in Korea rests in the hands of the managers of all the parties involved. These men set all the rules by which the new plants will be constructed. It is their responsibility to tackle the current problems and develop the solutions to enable the plan to be realized. The changes suggested within this paper are major, but the potential benefits will allow the Korean Nuclear Industry to advance into the twenty first Century as a leader. The number of fully trained specialists needed to make this happen will not appear overnight. They will have to be

  6. Efficient construction of two-dimensional cluster states with probabilistic quantum gates

    International Nuclear Information System (INIS)

    Chen Qing; Cheng Jianhua; Wang Kelin; Du Jiangfeng

    2006-01-01

    We propose an efficient scheme for constructing arbitrary two-dimensional (2D) cluster states using probabilistic entangling quantum gates. In our scheme, the 2D cluster state is constructed with starlike basic units generated from 1D cluster chains. By applying parallel operations, the process of generating 2D (or higher-dimensional) cluster states is significantly accelerated, which provides an efficient way to implement realistic one-way quantum computers

  7. Simulation-based modeling of building complexes construction management

    Science.gov (United States)

    Shepelev, Aleksandr; Severova, Galina; Potashova, Irina

    2018-03-01

    The study reported here examines the experience in the development and implementation of business simulation games based on network planning and management of high-rise construction. Appropriate network models of different types and levels of detail have been developed; a simulation model including 51 blocks (11 stages combined in 4 units) is proposed.

  8. A construction process model for implementing constructability in construction

    NARCIS (Netherlands)

    Langkemper, J.; Al-Jibouri, S.; Reymen, I.M.M.J.; Maas, G.J.; Gassel, van F.

    2003-01-01

    In construction, failure of design professionals to consider how a builder will implement the design can result in scheduling problems, cost escalation, delays and disputes during the construction process. The integration of construction knowledge and experience during planning and design is termed

  9. Survey of regulatory agency review of generating unit performance

    International Nuclear Information System (INIS)

    Roach, E.M. Jr.; Tarletz, D.B.

    1985-01-01

    Regulatory agencies across the country are being called upon increasingly to monitor the management of electric utilities. Such activity, which once was relatively rare, is now common. Most frequently this oversight centers around the operating performance of generating units, both nuclear and fossil. There are, perhaps, several reasons for this increased interest in the efficient operation of generating units: increased fuel costs and fuel cost differentials, increased lead times and costs for construction of new generating units, and increased dependence on existing units because of construction programs being revised to meet decreased load growth. The monitoring of generating units has taken the form of after the fact evaluation of performance on a case-by-case basis and the implementation of productivity incentive programs. Performance standards are used in these contexts both to measure the adequacy of unit performance and to implement incentives in the form of rewards or penalties. The standard used may be a subjective test of prudent performance or some numerical index of plant performance, e.g., equivalent availability, capacity factor or heat rate. Some of the activity by regulators is reviewed in applying subjective and numerical standards and the considerations involved in applying such standards are discussed

  10. Quality assurance and supervision of mass concrete construction under EPC mode

    International Nuclear Information System (INIS)

    Peng Hong

    2013-01-01

    Taking one typical general contraction project-Hainan Changjiang nuclear power project as an example, this paper introduces the mass concrete construction of nuclear island foundation of Unit 1 in its installation phase, elaborates how to conduct quality assurance and supervision for concrete production, construction, supervision and management, detects relevant weak points of quality and management in the mass concrete construction through quality assurance supervision, puts forward management requirements for the supervising organizations, accumulates useful experience on how to promote contractors to implement the contract in line with national laws, regulations and to improve the management in equipment installation, commissioning and acceptance. (authors)

  11. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Science.gov (United States)

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE.../build type contract, section 4, “Conflict of Interest,” may need revision. (l) Construction contract... materially affect the ability to attain program objectives or prevent the meeting of project work units by...

  12. Assembly of hydrogel units for 3D microenvironment in a poly(dimethylsiloxane) channel

    Science.gov (United States)

    Cho, Chang Hyun; Kwon, Seyong; Park, Je-Kyun

    2017-12-01

    Construction of three-dimensional (3D) microenvironment become an important issue in recent biological studies due to their biological relevance compared to conventional two-dimensional (2D) microenvironment. Various fabrication techniques have been employed to construct a 3D microenvironment, however, it is difficult to fully satisfy the biological and mechanical properties required for the 3D cell culture system, such as heterogeneous tissue structures generated from the functional differences or diseases. We propose here an assembly method for facile construction of 3D microenvironment in a poly(dimethylsiloxane) (PDMS) channel using hydrogel units. The high-aspect-ratio of hydrogel units was achieved by fabricating these units using a 2D mold. With this approach, 3D heterogeneous hydrogel units were produced and assembled in a PDMS channel by structural hookup. In vivo-like 3D heterogeneous microenvironment in a precisely controllable fluidic system was also demonstrated using a controlled assembly of different types of hydrogel units, which was difficult to obtain from previous methods. By regulating the flow condition, the mechanical stability of the assembled hydrogel units was verified by the flow-induced deformation of hydrogel units. In addition, in vivo-like cell culture environment was demonstrated using an assembly of cell-coated hydrogel units in the fluidic channel. Based on these features, our method expects to provide a beneficial tool for the 3D cell culture module and biomimetic engineering.

  13. Complex solution of problem of all-season construction of roads and pipelines on universal composite pontoon units

    Science.gov (United States)

    Ryabkov, A. V.; Stafeeva, N. A.; Ivanov, V. A.; Zakuraev, A. F.

    2018-05-01

    A complex construction consisting of a universal floating pontoon road for laying pipelines in automatic mode on its body all year round and in any weather for Siberia and the Far North has been designed. A new method is proposed for the construction of pipelines on pontoon modules, which are made of composite materials. Pontoons made of composite materials for bedding pipelines with track-forming guides for automated wheeled transport, pipelayer, are designed. The proposed system eliminates the construction of a road along the route, ensures the buoyancy and smoothness of the self-propelled automated stacker in the form of a "centipede", which has a number of significant advantages in the construction and operation of the entire complex in the swamp and watered areas without overburden.

  14. Fabrication and characteristics of unit cell for SOFC

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Gwi-Yeol; Eom, Seung-Wook; Moon, Seong-In [Korea Electrotechnology Research Institute, Kyongnam (Korea, Republic of)] [and others

    1996-12-31

    Research and development on solid oxide fuel cells in Korea have been mainly focused on unit cell and small stack. Fuel cell system is called clean generation system which not cause NOx or SOx. It is generation efficiency come to 50-60% in contrast to 40% of combustion generation system. Among the fuel cell system, solid oxide fuel cell is constructed of ceramics, so stack construction is simple, power density is very high, and there are no corrosion problems. The object of this study is to develop various composing material for SOFC generation system, and to test unit cell performance manufactured. So we try to present a guidance for developing mass power generation system. We concentrated on development of manufacturing process for cathode, anode and electrolyte.

  15. Construction and commissioning of the Hinkley Point 'B' and Hunterston 'B' boilers

    International Nuclear Information System (INIS)

    White, D.C.; Holmes, R.L.

    1977-01-01

    Prior to construction and erection of the reactor boiler units, within the concrete pressure vessel, the units were received from the manufacturing works, and stored in clean and humidity controlled conditions. Because of the loading facilities into the reactor pressure vessel, a very precise erection procedure had to be adhered to. The activities associated with construction of feedwater inlet, superheater steam, and reheated steam inlet and outlet penetrations had to be programmed accordingly. By the very nature of the work load, the time scale involved, and the prime need to maintain the boiler unit materials free of deterioration from atmospheric corrosion after erection, early commissioning of storage systems were implemented; providing wet or dry storage conditions as dictated by the two Generating Boards. Pre-operational commissioning also covered the work of setting up all the steam and water controls, isolating valve systems and the automatic and sequence equipment associated with the feed water controls which are a major design feature of the once through boiler operation. (author)

  16. Design and construction of a 7,500 liter immobilized cell reactor-separator for ethanol production from whey

    Energy Technology Data Exchange (ETDEWEB)

    Dale, M.C.

    1992-12-31

    A 7,500 liter reactor/separator has been constructed for the production of ethanol from concentrated whey permeate. This unit is sited in Hopkinton IA, across the street from a whey generating cheese plant A two phase construction project consisting of (1) building and testing a reactor/separator with a solvent absorber in a single unified housing, and (2) building and testing an extractive distillation/product stripper for the recovery of anhydrous ethanol is under way. The design capacity of this unit is 250,000 gal/yr of anhydrous product. Design and construction details of the reactor/absorber separator are given, and design parameters for the extractive distillation system are described.

  17. Construction and start-up testing experience of Kashiwazakikariwa Nuclear Power Station Unit No.1

    International Nuclear Information System (INIS)

    Natsume, Nobuo; Murakami, Hideaki

    1986-01-01

    In order to overcome the new location condition in Japan Sea coast, new techniques were developed and adopted to ensure the safety in construction and to shorten the construction period as far as possible. The commercial operation was started on September 18, 1985. This plant is a BWR plant of 1100 MWe output. The results of the improvement and standardization of BWRs and the measures for reliability improvement and radiation dose reduction were fully adopted in this plant. The site of the power station and the layout of the main facilities are explained. As the features of the location condition, the severe weather condition in winter such as snow, wind and lightning and high waves in the sea were considered. The rockbed for installing the foundation of the reactor building was deep, and the aseismatic design condition was made stricter, accordingly, the quantity of materials increased. A tent dome was developed to cover above the reactor containment vessel being assembled, a lightning forecast system was installed, and synchro-lift method was adopted for caisson breakwaters. The countermeasures to the deep rockbed and the measures to shorten the construction period were taken. The results of the trial operation are reported. (Kako, I.)

  18. Efficient turbine control. Advantages through controlling internal turbine power in place of turbo generator output; Effektive Turbinenregelung. Vorteile durch die Regelung der inneren Turbinenleistung anstelle der Turbogeneratorleistung

    Energy Technology Data Exchange (ETDEWEB)

    Sindelar, R.

    1999-07-01

    Hitherto, the electrical output of turbo generators has generally been controlled by means of power output controllers. Load changes caused, for example, by changeovers to isolated unit operation where the load requirements are unknown at first, often resulted in `wrong way control` effects that sometimes even caused entire turbine generator sets to fail. Controlling the internal turbine power makes it possible to avoid such consequences. (orig.) [Deutsch] Die elektrische Leistung eines Turbogenerators wurde bislang durch Leistungsregler geregelt. Im Falle einer Lastaenderung, wie sie beispielsweise beim Uebergang in den Betrieb auf ein Teilnetz (Insel-) mit vorher unbekannter Last vorkommt, trat ein Falschregeleffekt auf. Auf diesen wurden bereits Turbosatzausfaelle zurueckgefuehrt. Wird anstelle der elektrischen Leistung allerdings die innere Turbinenleistung geregelt, so tritt der Falschregeleffekt nicht ein. (orig.)

  19. Reduction in the specific consumption of heat by the thermal circuit, achieved by rationalization of the steam turbine condensation at nuclear power plants of the WWER-440 type

    International Nuclear Information System (INIS)

    Kubacek, A.

    1992-01-01

    Specific consumption of heat needed for the production of a net electricity unit is a criterion for assessing the efficiency of conversion of thermal energy into mechanical energy in the steam turbine. Based on theoretical calculations and analyses, a way of evaluating the specific heat consumption is demonstrated for the thermal circuit of the steam-engine equipment with one turbogenerator. The dependence of the specific heat consumption on the steam condensation temperature and on the amount of cooling water flowing through the condenser is calculated, as is the dependence of the limiting pressure on the relative loss of vacuum of the condenser and on the cooling water temperature. Such dependences can be used to upgrade the thermal circuit condensation regime. (M.D.). 2 figs., 12 refs

  20. ''PSAD'' on-line monitoring and aid to diagnosis workstation: a monitoring tool for EDF power plants

    International Nuclear Information System (INIS)

    Morel, J.; Mazalerat, J.M.; Monnier, B.; Cordier, R.

    1993-01-01

    Like other electricity utilities, Electricite de France seeks to enhance the safety and availability of its nuclear power plants. To this end, for over ten years EDF has been installing on each plant unit two monitoring systems of its own design, one to monitor the primary cooling system, and the other, the turbogenerator set. Since the beginning of this project, widespread progress has been made in techniques of signal acquisition and processing, and in diagnosis using artificial intelligence methods. EDF has decided to call on these advanced techniques in developing its new-generation monitoring equipment, and to integrate them in its development of a workstation for on-line monitoring and diagnosis-support (PSAD: Poste de Surveillance et d'Aide au Diagnostic). PSAD will be a tool for on-line monitoring of the main components in nuclear power plants (initially the main coolant pumps and turbogenerator sets, and soon thereafter, monitoring of internal structures, detection of loose parts in the primary cooling system, etc.). PSAD will provide plant personnel with indispensable support in their diagnosis of the condition of plant equipment. It will integrate user-friendly, high-performance systems that also free the operator from many day-to-day tasks. PSAD will have a flexible architecture, for optimum distribution of the computing power where it is most needed, thereby improving the quality of the data. This paper presents the project objectives and describes work currently under way to implement EDF's diagnosis-support strategy for the years to come. (authors). 5 figs., 6 refs

  1. Peru Brand: a Nation under Construction?

    OpenAIRE

    Elder Cuevas-Calderón

    2016-01-01

    During the last decade Peru has experienced a euphoric rediscovery –pseudo revaluation as a country– due to its booming gastronomy, tourism and economic growth.In this context, the presentresearch uses semio-psychoanalytic and postcolonial theories to explain Peru’s social outlook regarding the concept of nation, its reunion with a non-existent identity and the construction of the idea of nation based on the marketing campaign titled the Peru Brand. Thus, Peru Brand, far from uniting all Peru...

  2. Technique for Reduction of Environmental Pollution from Construction Wastes

    Science.gov (United States)

    Bakaeva, N. V.; Klimenko, M. Y.

    2017-11-01

    The results of the research on the negative impact construction wastes have on the urban environment and construction ecological safety are described. The research results are based on the statistical data and indicators calculated with the use of environmental pollution assessment in the restoration system of urban buildings technical conditions. The technique for the reduction of environmental pollution from construction wastes is scientifically based on the analytic summary of scientific and practical results for ecological safety ensuring at major overhaul and current repairs (reconstruction) of the buildings and structures. It is also based on the practical application of the probability theory method, system analysis and disperse system theory. It is necessary to execute some stages implementing the developed technique to reduce environmental pollution from construction wastes. The stages include various steps starting from information collection to the system formation with optimum performance characteristics which are more resource saving and energy efficient for the accumulation of construction wastes from urban construction units. The following tasks are solved under certain studies: basic data collection about construction wastes accumulation; definition and comparison of technological combinations at each system functional stage intended for the reduction of construction wastes discharge into the environment; assessment criteria calculation of resource saving and energy efficiency; optimum working parameters of each implementation stage are created. The urban construction technique implementation shows that the resource saving criteria are from 55.22% to 88.84%; potential of construction wastes recycling is 450 million tons of construction damaged elements (parts).

  3. State of development of superconducting turbogenerators

    International Nuclear Information System (INIS)

    Intichar, L.

    1995-01-01

    Two projects are reported intended to finally establish the necessary knowledge and results for product development, superconducting generators for power plant applications. One project is a German activity, focusing on two generator design models, and the other is a Japanese project. The project progress achieved in Japan is expected to lead within the next three years to successful completion and to a 70 MW generator demonstrating the feasibility of the technology, and its application to considerably higher power ranges. (orig./MM) [de

  4. Micro-cogeneration units based on Stirling engine for heating and their real operation

    Science.gov (United States)

    Čierny, Jaroslav; Patsch, Marek

    2014-08-01

    This article was deal with micro-cogeneration units based on Stirling engine. We watched problematic of real working Stirling engine. The article also contain hookup of unit constructed at University of Zilina.

  5. Coin sorting unit; Koka ikkatsu tonyu shori unit

    Energy Technology Data Exchange (ETDEWEB)

    Oyabu, H.; Nishiyama, T.; Iijima, S. [Fuji Electric Co. Ltd., Tokyo (Japan)

    1999-08-10

    There are promising demands for barrier-free vending machines which can easily be used by the aged and the handicapped as well as ordinary people. Fuji Electric had developed an advanced unit for throwing in coins for the new hearty series that can smoothly be used by the aged and the handicapped. Its main advantages are (1) two or more coins can be thrown in together, (2) The port for putting in coins and the port for taking out change are of unified construction and simply adjoin each other, (3) Directional signs in braille are added. (author)

  6. Introduction to Heating, Ventilation and Air Conditioning (HVAC). Instructor Edition. Introduction to Construction Series.

    Science.gov (United States)

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This instructor's guide contains the materials required to teach a competency-based introductory course in heating, ventilating, and air conditioning (HVAC) to students who have chosen to explore careers in construction. It contains three units: HVAC materials, HVAC tools, and applied skills. Each instructional unit includes some or all of the…

  7. Compact quantum group C*-algebras as Hopf algebras with approximate unit

    International Nuclear Information System (INIS)

    Do Ngoc Diep; Phung Ho Hai; Kuku, A.O.

    1999-04-01

    In this paper, we construct and study the representation theory of a Hopf C*-algebra with approximate unit, which constitutes quantum analogue of a compact group C*-algebra. The construction is done by first introducing a convolution-product on an arbitrary Hopf algebra H with integral, and then constructing the L 2 and C*-envelopes of H (with the new convolution-product) when H is a compact Hopf *-algebra. (author)

  8. Traction sheave elevator, hoisting unit and machine space

    Science.gov (United States)

    Hakala, Harri; Mustalahti, Jorma; Aulanko, Esko

    2000-01-01

    Traction sheave elevator consisting of an elevator car moving along elevator guide rails, a counterweight moving along counterweight guide rails, a set of hoisting ropes (3) on which the elevator car and counterweight are suspended, and a drive machine unit (6) driving a traction sheave (7) acting on the hoisting ropes (3) and placed in the elevator shaft. The drive machine unit (6) is of a flat construction. A wall of the elevator shaft is provided with a machine space with its open side facing towards the shaft, the essential parts of the drive machine unit (6) being placed in the space. The hoisting unit (9) of the traction sheave elevator consists of a substantially discoidal drive machine unit (6) and an instrument panel (8) mounted on the frame (20) of the hoisting unit.

  9. Participation of SKODA JS in the construction of the Temelin and Mochovce nuclear power plants

    International Nuclear Information System (INIS)

    Svec, A.; Zach, J.; Ruzicka, P.

    2000-01-01

    SKODA JS is the traditional manufacturer of WWER type reactor equipment and also supplier of the primary circuits and of equipment for the transport, refuelling and storage of fuel for Ver type nuclear power plants built in the Czech and Slovak Republics. The paper deals with activities of the company SKODA JS at two power plants whose reactor units are close to completion, viz. the Mochovce NPP in the Slovak Republic (4 x Ver 440 MW; unit 1 was put in operation in 1998, unit 2 is in the stage of commissioning, units 3 and 4 are not to be completed) and the Temelin NPP in the Czech Republic (2 x Ver 1000 MW, commissioning of units 1 and 2 is expected in 2001 and 2002, respectively). The scope of supplies to the two nuclear power plants (detailed design, delivery of equipment, installation, commissioning) and the course of construction from SKODA JS's viewpoint are described. The most important design changes and improvements made during the construction are highlighted. (author)

  10. Long-duration conservation of a nuclear power plant unit under construction

    International Nuclear Information System (INIS)

    Brun, C.; Long, A.; Saurin, P.; Liquette, A.

    1994-01-01

    The experience described is that of the Chooz B1 NPP unit, which had to be put into a state of conservation for one and one-half years with the reactor coolant system and auxiliary systems having been completely erected and internally cleaned. Erection of the secondary systems had been 80% completed. The dry conservation technique was adopted for all of the fluid systems and components, except for the injection and leakoff lines of the four reactor coolant pump no. 1 seals, for which wet conservation was employed. For the buildings themselves, Electricite de France (EdF) took measures to facilitate conservation, including ventilation and heating, limiting the entry of atmospheric air, and evacuating the dehumidifier regeneration air to the atmosphere via a collector and a fan. This conservation required the installation of 20 dry air generators, which enabled continuously circulating dry air through the systems and components. Monthly or bimonthly relative humidity checks, depending on the systems, were carried out. The results of these checks showed that the relative humidity remained below 50% throughout the NPP unit conservation period. For the steam generators, in addition to dry air circulation, humidity detectors as well as corrosion test coupons were installed on the tube sheet. (authors). 5 figs

  11. The Influence of an Information Environment on Construction Organization's Culture: A Case Study

    Directory of Open Access Journals (Sweden)

    Kenneth T. Sullivan

    2009-01-01

    Full Text Available Construction professionals have identified public contract law and bureaucratic procurement/contract offices as a source of problems in the construction industry. The culture within the United State's Federal Government Acquisitions is based on the Federal Acquisition Regulations (FARs and its interpretation, often placing organizations/agencies in the price-based environment and continuously resulting in poor performance. The United States Army Medical Command (MEDCOM (approximately $100 M in construction renovation awards per year attempted to overcome this obstacle through a partnership with the Performance-Based Studies Research Group (PBSRG at Arizona State University. The MEDCOM implemented the information environment portion of the Performance Information Procurement System (PIPS into Indefinite Delivery Indefinite Quantity (IDIQ contracts through the specifications. Without controlling the various contract/procurement processes, the developed information environment stimulated an atmosphere of accountability to all parties involved, while reducing the client's internal bureaucratic resistance. The concept has met with preliminary success, minimizing construction management issues by over 50%, raising owner satisfaction by 9%, resulting in 99% of projects ending with no contractor-generated change orders, and assisting MEDCOM leadership in measuring the performance of their infrastructure revitalization program.

  12. [Construction of a low-pH-sensing system in Streptococcus mutans].

    Science.gov (United States)

    Di, Kang; Yuqing, Li; Xuedong, Zhou

    2017-06-01

    To construct a low-pH-sensing system in Streptococcus mutans (S. mutans) and to visually detect the pH in situ. Promoter of ureaseⅠ(PureⅠ) and green fluorescence protein (gfp) DNA fragments were amplified by polymerase chain reaction (PCR) from the genome of Streptococcus salivarius 57.I and S. mutans containing the gfp fragment. The two amplified DNA fragments were ligated together and further integrated into pDL278 to construct the recombinant plasmid pDL278-pureⅠ-gfp. This recombinant plasmid was then transformed into S. mutans UA159 cells. Subsequently, the intensity of the optical density per unit area of the low-pH-sensing system was measured and compared under different pH conditions and different processing times. PureⅠ and gfp DNA fragments were amplified successfully with the correct molecule sizes (450 and 717 bp, respectively). The recombinant plasmid pDL278-pureⅠ-gfp was constructed and further verified by PCR and sequencing. The intensity of the optical density per unit area of the low-pH-sensing system increased with decreasing pH and increasing processing time. A low-pH-sensing system was constructed successfully in S. mutans. Our research verified that pureⅠ of Streptococcus salivarius can function well in S. mutans as an acid induced promoter, and provided a new method of detecting the pH of plaque biofilms in situ.

  13. Construction of cost effective homebuilt spin coater for coating ...

    African Journals Online (AJOL)

    We report the construction of a cost effective and low power consumption spin coater from a direct current (DC) brushless motor. The DC mechanical component is widdely available in the central processing unit (CPU) cooler. This set up permits simple operation where the DC voltage can be controlled manually in order to ...

  14. Construction of overseas nuclear power plants for first time by Japanese industry

    International Nuclear Information System (INIS)

    Maruyama, Tohru; Naruse, Yoshihiro; Yabuta, Hitoshi

    2010-01-01

    In response to the worldwide demand for stable energy supplies and the reduction of greenhouse gas emissions, nuclear power plant construction projects have been expanding on a global scale. Even in the United States, where no nuclear power plants have been constructed over the past 30 years, there are plans for the construction of more than 30 plants. Toshiba has been awarded a contract for a nuclear power plant construction project in the U.S., the first case of overseas nuclear power plant construction by Japanese industry. Toshiba America Nuclear Energy Corporation (TANE), the first U.S. subsidiary in our nuclear business, located in Charlotte, North Carolina, is engaged in this globally prominent project, applying various technologies and know-how that we have cultivated over many years of experience in developing and constructing nuclear power plants in Japan and adapting them to U.S. business practices, laws, and regulations. (author)

  15. 40 CFR 60.1010 - Does this subpart apply to my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... waste combustion unit? 60.1010 Section 60.1010 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30....1010 Does this subpart apply to my municipal waste combustion unit? Yes, if your municipal waste...

  16. Toward a constructive physics

    International Nuclear Information System (INIS)

    Noyes, H.P.; Gefwert, C.; Manthey, M.J.

    1983-06-01

    We argue that the discretization of physics which has occurred thanks to the advent of quantum mechanics has replaced the continuum standards of time, length and mass which brought physics to maturity by counting. The (arbitrary in the sense of conventional dimensional analysis) standards have been replaced by three dimensional constants: the limiting velocity c, the unit of action h, and either a reference mass (eg m/sub p/) or a coupling constant (eg G related to the mass scale by hc/(2πGm/sub p/ 2 ) approx. = 1.7 x 10 38 ). Once these physical and experimental reference standards are accepted, the conventional approach is to connect physics to mathematics by means of dimensionless ratios. But these standards now rest on counting rather than ratios, and allow us to think of a fourth dimensionless mathematical concept, which is counting integers. According to constructive mathematics, counting has to be understood before engaging in the practice of mathematics in order to avoid redundancy. In its strict form constructive mathematics allows no completed infinities, and must provide finite algorithms for the computation of any acceptable concept. This finite requirement in constructive mathematics is in keeping with the practice of physics when that practice is restricted to hypotheses which are testable in a finite time. In this paper we attempt to outline a program for physics which will meet these rigid criteria while preserving, in so far as possible, the successes that conventional physics has already achieved

  17. Toward a constructive physics

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, H.P.; Gefwert, C.; Manthey, M.J.

    1983-06-01

    We argue that the discretization of physics which has occurred thanks to the advent of quantum mechanics has replaced the continuum standards of time, length and mass which brought physics to maturity by counting. The (arbitrary in the sense of conventional dimensional analysis) standards have been replaced by three dimensional constants: the limiting velocity c, the unit of action h, and either a reference mass (eg m/sub p/) or a coupling constant (eg G related to the mass scale by hc/(2..pi..Gm/sub p//sup 2/) approx. = 1.7 x 10/sup 38/). Once these physical and experimental reference standards are accepted, the conventional approach is to connect physics to mathematics by means of dimensionless ratios. But these standards now rest on counting rather than ratios, and allow us to think of a fourth dimensionless mathematical concept, which is counting integers. According to constructive mathematics, counting has to be understood before engaging in the practice of mathematics in order to avoid redundancy. In its strict form constructive mathematics allows no completed infinities, and must provide finite algorithms for the computation of any acceptable concept. This finite requirement in constructive mathematics is in keeping with the practice of physics when that practice is restricted to hypotheses which are testable in a finite time. In this paper we attempt to outline a program for physics which will meet these rigid criteria while preserving, in so far as possible, the successes that conventional physics has already achieved.

  18. Estimated United States Transportation Energy Use 2005

    Energy Technology Data Exchange (ETDEWEB)

    Smith, C A; Simon, A J; Belles, R D

    2011-11-09

    A flow chart depicting energy flow in the transportation sector of the United States economy in 2005 has been constructed from publicly available data and estimates of national energy use patterns. Approximately 31,000 trillion British Thermal Units (trBTUs) of energy were used throughout the United States in transportation activities. Vehicles used in these activities include automobiles, motorcycles, trucks, buses, airplanes, rail, and ships. The transportation sector is powered primarily by petroleum-derived fuels (gasoline, diesel and jet fuel). Biomass-derived fuels, electricity and natural gas-derived fuels are also used. The flow patterns represent a comprehensive systems view of energy used within the transportation sector.

  19. Thermoeconomic analysis of a fuel cell hybrid power system from the fuel cell experimental data

    Energy Technology Data Exchange (ETDEWEB)

    Alvarez, Tomas [Endesa Generacion, Ribera del Loira, 60, 28042 Madrid (Spain)]. E-mail: talvarez@endesa.es; Valero, Antonio [Fundacion CIRCE, Centro Politecnico Superior, Maria de Luna, 3, 50018 Zaragoza (Spain); Montes, Jose M. [ETSIMM-Universidad Politecnica de.Madrid, Rios Rosas, 21, 28003 Madrid (Spain)

    2006-08-15

    An innovative configuration of fuel cell technology is proposed based on a hybrid fuel cell system that integrates a turbogenerator to overcome the intrinsic limitations of fuel cells in conventional operation. An analysis is done of the application of molten carbonate fuel cell technology at the Guadalix Fuel Cell Test Facility, for the assessment of the performance of the fuel cell prototype to be integrated in the Hybrid Fuel Cell System. This is completed with a thermoeconomic analysis of the 100 kW cogeneration fuel cell power plant which was subsequently built. The operational results and design limitations are evaluated, together with the operational limits and thermodynamic inefficiencies (exergy destruction and losses) of the 100 kW fuel cell. This leads to the design of a hybrid system in order to demonstrate the possibilities and benefits of the new hybrid configuration. The results are quantified through a thermoeconomic analysis in order to get the most cost-effective plant configuration. One promising configuration is the MCFC topper where the fuel cell in the power plant behaves as a combustor for the turbogenerator. The latter behaves as the balance of plant for the fuel cell. The combined efficiency increased to 57% and NOx emissions are essentially eliminated. The synergy of the fuel cell/turbine hybrids lies mainly in the use of the rejected thermal energy and residual fuel from the fuel cell to drive the turbogenerator in a 500 kW hybrid system.

  20. Identifying and managing risk in international construction projects

    Directory of Open Access Journals (Sweden)

    Sachin Kerur

    2012-04-01

    Full Text Available Over the last decade, major construction projects have increasingly arisen in countries or regions that lack specialist, expert construction contractors, suppliers and consultants. Steps are being taken by governments in the Middle East, Eastern Europe, China, India and developing markets to address national infrastructure deficits, and by so doing, are creating new regions of booming construction demand. When coupled with anaemic growth in developed markets such as the United Kingdom, the USA and Western Europe, foreign markets present attractive opportunities to the global construction industry. However, foreign markets are littered with the cautionary tales of international contractors and consultants that have failed to grasp the intricacies and risks of operating in a new environment and have failed to capitalise on the opportunities available. By identifying the classes of risks, and undertaking detailed analysis, ranking and mitigation of relevant jurisdictional risks, participants in international construction projects will increase the likelihood of project success and commercial longevity in the new jurisdiction. Risk identification and assessment is not a science but an art, and while there are many potential approaches to the issue, we propose that our strategies for identifying, assessing, ranking and mitigating jurisdictional risks offer new international players a good chance of commercial success.

  1. International comparison of economic and technical indexes of nuclear power plant construction

    International Nuclear Information System (INIS)

    Majer, P.; Fialova, H.

    1988-01-01

    The comparison of capital costs of the construction of nuclear power plants takes into consideration the following aspects: the delineation of the installation, the determination of costs and their break-down, the impact of the time factor, the conversion of the costs to a comparable unit. Power plants are always compared with roughly the same power capacity, this even when conditions for construction are not fully comparable. Construction costs may be divided into, e.g., pre-construction costs, direct capital costs, indirect capital costs, interest during construction. The time factor is manifest in the duration of construction and in the concrete year of construction for which the comparison is being made. The inflationary rise in prices and interests are increasing capital costs by roughly 5 - 8% per annum. The comparison of costs expressed in different currencies is made either by conversion using the rate of exchange or by comparing the time expended for the construction of the power plant. Various methods of comparison are discussed. (J.B.). 7 refs

  2. Solar-energy conversion system provides electrical power and thermal control for life-support systems

    Science.gov (United States)

    Davis, B. K.

    1974-01-01

    System utilizes Freon cycle and includes boiler turbogenerator with heat exchanger, regenerator and thermal-control heat exchangers, low-pressure and boiler-feed pumps, and condenser. Exchanger may be of interest to engineers and scientists investigating new energy sources.

  3. From a Distance: Student Empowerment and Constructing Teacher Identities Online

    Directory of Open Access Journals (Sweden)

    Ayshe TALAY-ONGAN

    2004-07-01

    Full Text Available ABSTRACT Online learning has infiltrated tertiary learning and teaching applications and offers enrichment in the construction of student learning through opportunities unfathomable for most university teachers when they were students. While all students benefit from online learning components that are supplemental to more traditional modes of teaching, it is the distance education students who are the most significant beneficiaries of these applications. This paper presents a framework developed towards ongoing dynamic evaluations of undergraduate units that are fully online on the WebCT platform in one of Australia's leading early childhood teacher education programs. It also describes a journey in which online learning and teaching experiences harnessed technology to better suit pedagogically-driven innovations and initiatives through unit content, instructional design and the emotionally supportive and empowering 'community spirit' created through online communications for distance education students. These experiences helped shape a platform of social discourse in constructing complex professional identities of pre-service early childhood teachers, and one of their teachers.

  4. Construction and validation of a tool to Assess the Use of Light Technologies at Intensive Care Units.

    Science.gov (United States)

    Marinho, Pabliane Matias Lordelo; Campos, Maria Pontes de Aguiar; Rodrigues, Eliana Ofélia Llapa; Gois, Cristiane Franca Lisboa; Barreto, Ikaro Daniel de Carvalho

    2016-12-19

    to construct and validate a tool to assess the use of light technologies by the nursing team at Intensive Care Units. methodological study in which the tool was elaborated by means of the psychometric method for construction based on the categorization of health technologies by Merhy and Franco, from the National Humanization Policy, using the Nursing Intervention Classification taxonomy to categorize the domains of the tool. Agreement Percentages and Content Validity Indices were used for the purpose of validation. The result of the application of the Interrater Agreement Percentage exceeded the recommended level of 80%, highlighting the relevance for the proposed theme in the assessment, with an agreement rate of 99%. the tool was validated with four domains (Bond, Autonomy, Welcoming and Management) and nineteen items that assess the use of light technologies at Intensive Care Units. construir e validar um instrumento para avaliação do uso de tecnologias leves, pela equipe de enfermagem, em Unidades de Terapia Intensiva. estudo metodológico no qual o instrumento foi elaborado utilizando o método psicométrico para construção com base na categorização das tecnologias em saúde de Merhy e Franco, da Política Nacional de Humanização, utilizando-se a taxonomia Nursing Intervention Classification para categorizar os domínios do instrumento. Utilizou-se o Percentual de Concordância e o Índice de Validade de Conteúdo (IVC) para validação. o resultado da aplicação do Percentual de Concordância entre os juízes foi superior ao recomendado de 80%, havendo destaque na avaliação da pertinência ao tema proposto, apresentando um percentual de concordância de 99%. o instrumento foi validado com quatro domínios (Vínculo, Autonomia, Acolhimento e Gestão) e dezenove itens que avaliam o uso das tecnologias leves em Unidade de Terapia Intensiva. construir y validar un instrumento para evaluación del uso de tecnologías leves, por el equipo de enfermer

  5. Assembling optically active and nonactive metamaterials with chiral units

    Directory of Open Access Journals (Sweden)

    Xiang Xiong

    2012-12-01

    Full Text Available Metamaterials constructed with chiral units can be either optically active or nonactive depending on the spatial configuration of the building blocks. For a class of chiral units, their effective induced electric and magnetic dipoles, which originate from the induced surface electric current upon illumination of incident light, can be collinear at the resonant frequency. This feature provides significant advantage in designing metamaterials. In this paper we concentrate on several examples. In one scenario, chiral units with opposite chiralities are used to construct the optically nonactive metamaterial structure. It turns out that with linearly polarized incident light, the pure electric or magnetic resonance (and accordingly negative permittivity or negative permeability can be selectively realized by tuning the polarization of incident light for 90°. Alternatively, units with the same chirality can be assembled as a chiral metamaterial by taking the advantage of the collinear induced electric and magnetic dipoles. It follows that for the circularly polarized incident light, negative refractive index can be realized. These examples demonstrate the unique approach to achieve certain optical properties by assembling chiral building blocks, which could be enlightening in designing metamaterials.

  6. Welding of large-size embelled fittings in NPP construction

    International Nuclear Information System (INIS)

    Semenov, N.A.; Savinov, O.A.

    1988-01-01

    Drawbacks of the accepted technology for peoducing embedded fittings are considered. Activities on modernization of the standard ADF-2001 automatic welding machine are described. Results of testing the samples of welded joints performed using the modernized automatic welding machine, and economic effect caused by its introduction at the balakovo NPP second unit construction are presented

  7. A profile of wood use in nonresidential building construction

    Science.gov (United States)

    H. N. Spelter; R. G. Anderson

    This report presents estimates of the amounts of lumber, glued-laminated lumber, trusses, plywood, particleboard, hardboard, and wood shingles used in new nonresidential building construction in the United States. Use of wood products is shown for several building types, project sizes, and building components. The estimates are based on a survey of 489 projects under...

  8. Warrior Heroes and Little Green Men: Soldiers, Military Training, and the Construction of Rural Masculinities.

    Science.gov (United States)

    Woodward, Rachel

    2000-01-01

    Examines military training in the United Kingdom; the construction of military masculinities, particularly the ideal type of the warrior hero; and the role of the countryside (as the training location) and rurality (as a social construction) in that process. Argues that becoming an infantry soldier means being molded to this hegemonic model of…

  9. Nuclear power system

    International Nuclear Information System (INIS)

    Yampolsky, J.S.; Cavallaro, L.; Paulovich, K.F.; Schleicher, R.W.

    1989-01-01

    This patent describes an inherently safe modular nuclear power system for producing electrical power at acceptable efficiency levels using working fluids at relatively low temperatures and pressures. The system comprising: a reactor module for heating a first fluid; a heat exchanger module for transferring heat from the first fluid to a second fluid; a first piping system effecting flow of the first fluid in a first fluid circuit successively through the reactor module and the heat exchanger module; a power conversion module comprising a turbogenerator driven by the second fluid, and means for cooling the second fluid upon emergence thereof from the turbogenerator; a second piping system comprising means for effecting flow of the second fluid in a second fluid circuit successively through the heat exchanger module and the power conversion module; and a plurality of pits for receiving the modules

  10. Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects

    Science.gov (United States)

    Lapidus, Azary; Abramov, Ivan

    2018-03-01

    Development of efficient algorithms for designing future operations is a vital element in construction business. This paper studies various aspects of a methodology required to determine the integration index for construction crews performing various process-related jobs. The main objective of the study outlined in this paper is to define the notion of integration in respect to a construction crew that performs complete cycles of construction and assembly works in order to find the optimal organizational solutions, using the integrated crew algorithm built specifically for that purpose. As seen in the sequence of algorithm elements, it was designed to focus on the key factors affecting the level of integration of a construction crew depending on the value of each of those elements. The multifactor modelling approach is used to assess the KPI of integrated construction crews involved in large-sale high-rise construction projects. The purpose of this study is to develop a theoretical recommendation and a scientific methodological provision of organizational and technological nature to ensure qualitative formation of integrated construction crews to increase their productivity during integrated implementation of multi-task construction phases. The key difference of the proposed solution from the already existing ones is that it requires identification of the degree of impact of each factor, including the change in the qualification level, on the integration index of each separate element in the organizational and technological system in construction (integrated construction crew).

  11. Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects

    Directory of Open Access Journals (Sweden)

    Lapidus Azary

    2018-01-01

    Full Text Available Development of efficient algorithms for designing future operations is a vital element in construction business. This paper studies various aspects of a methodology required to determine the integration index for construction crews performing various process-related jobs. The main objective of the study outlined in this paper is to define the notion of integration in respect to a construction crew that performs complete cycles of construction and assembly works in order to find the optimal organizational solutions, using the integrated crew algorithm built specifically for that purpose. As seen in the sequence of algorithm elements, it was designed to focus on the key factors affecting the level of integration of a construction crew depending on the value of each of those elements. The multifactor modelling approach is used to assess the KPI of integrated construction crews involved in large-sale high-rise construction projects. The purpose of this study is to develop a theoretical recommendation and a scientific methodological provision of organizational and technological nature to ensure qualitative formation of integrated construction crews to increase their productivity during integrated implementation of multi-task construction phases. The key difference of the proposed solution from the already existing ones is that it requires identification of the degree of impact of each factor, including the change in the qualification level, on the integration index of each separate element in the organizational and technological system in construction (integrated construction crew.

  12. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  13. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  14. Stainless steel pool constructing technology and management of Fangjiashan Nuclear Power Company

    International Nuclear Information System (INIS)

    Wei Lianfeng; Wang Qun

    2013-01-01

    The construction of Fangjiashan nuclear power plant stainless steel cladding has been taken much attention. Based on the careful analysis of stainless steel cladding welding and construction main issues; Many measures have been taken such as welding technology, construction process, the stress control of welding deformation, the cleanliness control of construction process, install precision control, improvements of Non-destructive testing, product protection, etc. And installation methods and techniques have been improved and innovative, the installation quality of stainless steel cladding has been enhanced. At the same time, as owners of the plants, we explored the methods of quality supervision and control, together with the relevant units; and sense of quality management has been unified effectively, made stainless steel cladding quality getting better and better. Fangjiashan nuclear power stainless steel cladding construction quality and management experience has been highly recognized by every company. (authors)

  15. 40 CFR 60.1810 - How do I monitor the load of my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... municipal waste combustion unit? 60.1810 Section 60.1810 Protection of Environment ENVIRONMENTAL PROTECTION... Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30... combustion unit? (a) If your municipal waste combustion unit generates steam, you must install, calibrate...

  16. The Dangling model in the construction of compound sentences with regard to verb tenses

    Directory of Open Access Journals (Sweden)

    Mahmoud Mehravaran

    2016-02-01

    Full Text Available Abstract A sentence is the most complete syntactic unit of a language. The construction of a sentence is the most comprehensive, controversial and fascinating syntactic issue in the language grammar. The message or intention is usually conveyed through a sentence. In fact, the communicative function of a language is carried out via a sentence. A sentence can be classified in to different categories from different perspectives: semantically, constructively or performatively either with a verb or without a verb and also with regard to the construction. With regard to the construction, a sentence is either simple or compound. A simple sentence is the one with a complete meaning which only has one verb. It must be born in mind that a sentence is a complete unit whit meaning and there can be a hesitation after that. There for units of speech that have a verb without a complete meaning and there can be no silence or hesitation after them cannot be regarded as a sentence. Since they are dependent upon another sentence to be completed. They are called phrases. Such phrases can be incorporated in compound sentences make main and subordinate clauses. Compound sentences are widely discussed whit in grammatical constructions, but their types and that how have been built their various constructions are less adequately discussed. With regard to the manner of construction of compound sentences, the widest linguistic amenities can be observed in the sentences. There is not such complexity or disagreement over simple sentences but compound sentences have been less adequately investigated and there is room for more discussion and debate. Because, in some grammars, without considering the construction criteria, all sentences that are connected to one another, whit connectives are called compound sentences. This paper has precisely investigated compound sentences and has elaborated on the construction criteria of compound sentences. The study has also pointed to

  17. Informal worker phenomenon in housing construction project

    Science.gov (United States)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  18. Standardization of nuclear power plants in the United States: recent regulatory developments

    International Nuclear Information System (INIS)

    Cowan, B.Z.; Tourtellotte, J.R.

    1992-01-01

    On April 18, 1989, the United States (U.S.) Nuclear Regulatory Commission (NRC) amended the regulations governing the process for licensing nuclear power plants in the United States to provide for issuance of early site permits, standard design certifications and combined construction permits and operating licenses for nuclear power reactors. The new regulations are designed to achieve early resolution of licensing issues and facilitate standardization of nuclear power plants in the United States. The program for design standardization is central to efforts mounted by the U.S. government and industry to ensure that there will be a next generation of nuclear power facilities in the U.S. The most significant changes are provisions for certification of standard designs and for issuance prior to start of construction of combined licenses which incorporate a construction permit and an operating license with conditions. Such certifications and combined licenses must contain tests, inspections and analyses, and acceptance criteria, which are necessary and sufficient to provide reasonable assurance that the facility has been constructed and will operate in accordance with the combined license. A number of significant implementation issues have arisen. In addition a major court case brought by several anti-nuclear groups is pending, challenging NRC authority to issue combined licenses. It is the goal of the U.S. nuclear industry to have the first of the next generation of standardized nuclear power plants ordered, licensed, constructed and on-line by the year 2000. (author)

  19. Nano-in-Micro Self-Reporting Hydrogel Constructs.

    Science.gov (United States)

    Tirella, Annalisa; La Marca, Margherita; Brace, Leigh-Anne; Mattei, Giorgio; Aylott, Jonathan W; Ahluwalia, Arti

    2015-08-01

    Highly reproducible Nano-in-Micro constructs are fabricated to provide a well-defined and self-reporting biomimetic environment for hepatocytes. Based on a protein/hydrogel formulation with controlled shape, size and composition, the constructs enable efficient nutrient exchange and provide an adhesive 3D framework to cells. Co-encapsulation of hepatocytes and ratiometric optical nanosensors with pH sensitivity in the physiological range allows continuous monitoring of the microenvironment. The lobule-sized microbeads are fabricated using an automated droplet generator, Sphyga (Spherical Hydrogel Generator) combining alginate, collagen, decellularized hepatic tissue, pH-nanosensors and hepatocytes. The pH inside the Nano-in-Micro constructs is monitored during culture, while assaying media for hepatic function and vitality markers. Although the local pH changes by several units during bead fabrication, when encapsulated cells are most likely to undergo stress, it is stable and buffered by cell culture media thereafter. Albumin secretion and urea production are significantly higher in the microbeads compared with controls, indicating that the encapsulated Nano-in-Micro environment is conducive to enhanced hepatic function.

  20. Analysis of the current status of measuring chains of the in-service diagnosis system at the Dukovany NPP

    International Nuclear Information System (INIS)

    Stulik, P.; Sipek, B.

    2006-02-01

    The following systems were analyzed for the Dukovany NPP: Monitoring of primary circuit and reactor vibrations; Detection of loose parts; Main coolant pump diagnosis; Reactor internals diagnosis; and Turbogenerator status monitoring. Recommendations were derived from the findings. (P.A.)

  1. Single- and Multi-Prime Contracting in North Carolina Public Construction.

    Science.gov (United States)

    Bluestein, Frayda S.

    1995-01-01

    The North Carolina General Assembly directed the State Building Commission to study the comparative costs of multi- and single-prime contracting and report the results to the 1995 General Assembly. Describes the analysis of data collected from governmental units that had awarded construction contracts. Identifies some alternative contracting…

  2. Final supplement to the final environmental statement related to construction of Palo Verde Nuclear Generating Station Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1976-02-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation local ephemeral water courses. Stringent measures will be taken to minimize these effects (Sec. 4.5). Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do results from the proposed action. 26 refs., 1 fig., 20 tabs

  3. Construction management of Indian pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Bohra, S.A.; Sharma, P.D.

    2006-01-01

    Pandit Jawaharlal Nehru and Dr. Homi J. Bhabha, the visionary architects of Science and Technology of modern India foresaw the imperative need to establish a firm base for indigenous research and development in the field of nuclear electricity generation. The initial phase has primarily focused on the technology development in a systematic and structured manner, which has resulted in establishment of strong engineering, manufacturing and construction base. The nuclear power program started with the setting up of two units of boiling light water type reactors in 1969 for speedy establishment of nuclear technology, safety culture, and development of operation and maintenance manpower. The main aim at that stage was to demonstrate (to ourselves, and indeed to the rest of the world) that India, inspite of being a developing country, with limited industrial infrastructure and low capacity power grids, could successfully assimilate the high technology involved in the safe and economical operation of nuclear power reactors. The selection of a BWR was in contrast to the pressurized heavy water reactors (PHWR), which was identified as the flagship for the first stage of India's nuclear power program. The long-term program in three stages utilizes large reserves of thorium in the monazite sands of Kerala beaches in the third stage with first stage comprising of series of PHWR type plants with a base of 10,000 MW. India has at present 14 reactors in operation 12 of these being of PHWR type. The performance of operating units of 2720 MW has improved significantly with an overall capacity factor of about 90% in recent times. The construction work on eight reactor units with installed capacity of 3960 MW (two PHWRs of 540 MW each, four PHWRs of 220 MW each and two VVERs of 1000 MW each) is proceeding on a rapid pace with project schedules of less than 5 years from first pour of concrete. This is being achieved through advanced construction technology and management. Present

  4. Fiber Reinforced Concrete (FRC) for High Rise Construction: Case Studies

    Science.gov (United States)

    Gharehbaghi, Koorosh; Chenery, Rhea

    2017-12-01

    Due to its material element, Fiber Reinforced Concrete (FRC) could be stronger than traditional Concrete. This is due to FRC internal material compounds and elements. Furthermore, FRC can also significantly improve flexural strength when compared to traditional Concrete. This improvement in flexural strength can be varied depending on the actual fibers used. Although not new, FRC is gradually gaining popularity in the construction industry, in particular for high rise structures. This is due to its flexural strength, especially for high seismic zones, as it will provide a better solution then reinforced Concrete. The main aim of this paper is to investigate the structural importance of FRC for the high rise construction. Although there has been numerous studies and literature in justifying the FRC for general construction; this paper will consider its use specifically for high rise construction. Moreover, this paper will closely investigate eight case studies from Australian and United States as a part of the FRC validation for high rise construction. In doing so, this paper will examine their Structural Health Monitoring (SHM) to determine their overall structural performance.

  5. Field monitoring of column shortenings in a high-rise building during construction.

    Science.gov (United States)

    Choi, Se Woon; Kim, Yousok; Kim, Jong Moon; Park, Hyo Seon

    2013-10-24

    The automatic monitoring of shortenings of vertical members in high-rise buildings under construction is a challenging issue in the high-rise building construction field. In this study, a practical system for monitoring column shortening in a high-rise building under construction is presented. The proposed monitoring system comprises the following components: (1) a wireless sensing system and (2) the corresponding monitoring software. The wireless sensing system comprises the sensors and energy-efficient wireless sensing units (sensor nodes, master nodes, and repeater nodes), which automate the processes for measuring the strains of vertical members and transmitting the measured data to the remote server. The monitoring software enables construction administrators to monitor real-time data collected by the server via an Internet connection. The proposed monitoring system is applied to actual 66-floor and 72-floor high-rise buildings under construction. The system enables automatic and real-time measurements of the shortening of vertical members, which can result in more precise construction.

  6. Arusha windmill: a construction manual

    Energy Technology Data Exchange (ETDEWEB)

    Stanley, D

    1977-01-01

    The advantages of the Arusha (Tanzania) low-cost windmill for rural communities in the Third World are described, and the history of its development is recounted. A description of the fan-bladed windmill's operation,d esign, cost, parts and materials, and tools required are given. The construction of such a windmill is described in extensive detail followed by discussions of the operation, maintenance and alterations of the windmill, pumps to be used with the windmill and other uses of the rotary power generated. Useful data and design formulae, a glossary and a unit conversion table are included.

  7. Accounting and analysis of the real labour input for objects and types of works during NPP construction

    International Nuclear Information System (INIS)

    Shuvaev, P.P.

    1983-01-01

    A technique for determining the actual labour input for PP construction according to types of works, construction units and objects is considered. The data are presented on specific expenditures on civil engineering, heat and electric installation, insulation and anticorrosion works for construction of the Chernobylsk and Kursk NPPs. A conclusion is drawn about the necessity of computer utilization in calculating the labour input for different types of works, number of workers and planning works during the NPP construction

  8. Utilization of stabilized municipal waste combustion ash residues as construction material

    International Nuclear Information System (INIS)

    Shieh, C.S.

    1992-01-01

    Stabilized municipal waste combustion (MWC) ash residues were investigated for their potential as construction material that can be beneficially used in terrestrial and marine environments. End-use products, such as patio stones, brick pavers, solid blocks, and reef units, were fabricated and tested for their engineering and chemical characteristics. engineering feasibility and environmental acceptability of using stabilized ash residues as construction material are discussed in this paper. Ash samples were collected from two mass-burn facilities and one refuse derived fuel (RDF) facility in Florida

  9. Lessons learned from standardized plant design and construction

    International Nuclear Information System (INIS)

    Roche, B.

    1999-01-01

    Following France's hydropower program, Electricite de France began producing electricity with nuclear power during the 60s with units that were all different. In the early 70s, EDF launched an extensive nuclear program which was fueled by the 1973 oil crisis. The particularity of this program is based on the standardization of the design which enables the cost of engineering studies, components and construction to be reduced. As all of the sites presented various conditions, a single design was possible except for the heat sink, connection to the grid and foundations. In order to follow technical progress, the program was divided into several homogeneous series: CP0, CP1 and CP2 for 900 MWe reactors, P4 and P'4 for 1300 MWe reactors and N4 for 1450 MWe reactors. EDF has managed to apply standardization throughout the service life of the plant: all units of the same series are modified in the same manner and with a same batch of modifications. The standardization of operations is also the EDF's rule: technical specifications, safety reports, and safety procedures are normally the same for units belonging to the same series. Nevertheless, when plant design and operations, and heavy maintenance are considered, it becomes increasingly difficult to maintain strict standardization across the board: when examined closely, variations are possible-as regards the chemical specifications of the secondary system, for instance. On the other hand, at the fabrication stage, it is difficult to maintain fabrication procedures and alloy compositions rigorously the same. Standardization offers a tremendous advantage representing 30-40% of construction costs. The main drawback is the risk of generic defects. On the other hand, the risk is rather small owing to the small differences among units. (author)

  10. Construction and Analysis of Functional Networks in the Gut Microbiome of Type 2 Diabetes Patients.

    Science.gov (United States)

    Li, Lianshuo; Wang, Zicheng; He, Peng; Ma, Shining; Du, Jie; Jiang, Rui

    2016-10-01

    Although networks of microbial species have been widely used in the analysis of 16S rRNA sequencing data of a microbiome, the construction and analysis of a complete microbial gene network are in general problematic because of the large number of microbial genes in metagenomics studies. To overcome this limitation, we propose to map microbial genes to functional units, including KEGG orthologous groups and the evolutionary genealogy of genes: Non-supervised Orthologous Groups (eggNOG) orthologous groups, to enable the construction and analysis of a microbial functional network. We devised two statistical methods to infer pairwise relationships between microbial functional units based on a deep sequencing dataset of gut microbiome from type 2 diabetes (T2D) patients as well as healthy controls. Networks containing such functional units and their significant interactions were constructed subsequently. We conducted a variety of analyses of global properties, local properties, and functional modules in the resulting functional networks. Our data indicate that besides the observations consistent with the current knowledge, this study provides novel biological insights into the gut microbiome associated with T2D. Copyright © 2016. Production and hosting by Elsevier Ltd.

  11. Ultra-low-energy wide electron exposure unit

    International Nuclear Information System (INIS)

    Yonago, Akinobu; Oono, Yukihiko; Tokunaga, Kazutoshi; Kishimoto, Junichi; Wakamoto, Ikuo

    2001-01-01

    Heat and ultraviolet ray processes are used in surface dryness of paint, surface treatment of construction materials and surface sterilization of food containers. A process using a low-energy wide-area electron beam (EB) has been developed that features high speed and low drive cost. EB processing is not widespread in general industry, however, due to high equipment cost and difficult maintenance. We developed an ultra-low-energy wide-area electron beam exposure unit, the Mitsubishi Wide Electron Exposure Unit (MIWEL) to solve these problems. (author)

  12. Construction and mounting technology of NPP in France

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    Principal peculiarities of construction sequence of building 1300 MW(e) single-unit NPPs in France are described. A NPP is housed in a two-layer containment building with 1.5% leakage of medium per day. The internal shell, 900 mm thich, is made of prestressed reinforced concrete; the external shell is made of reinforced concrete. The sequence and organizing of concrete operations using concrete pumps with capacity of 50 m 3 /h, concrete distributors ensuring concrete delivery to a distance of 46 m and belt conveyers assuring 80-100 m 3 /h concrete placing are described. A concrete plant of 120-180 μ 3 /h productive capacity equipped with a system for computerized automatic programming of the mixture composition is built to provide concrete mixture for NPP construction sites. The workshops are developed at the construction site to fabricate concrete structures with specific reinforcement consumption up to 250 kg/m 3 . The reinforcement is assembled with the use of special pipe couplings, welding of reinforcement is prohibited. Enlarged reinforced concrete blocks sized up to 250 t are employed to reduce the construction terms and to improve the quality of work

  13. Chemistry control at Bruce NGS 'B' from constructed to commercial operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    1987-01-01

    Pre-operational storage chemistry and flushing of the secondary side is described. The approach devised for Bruce NGS 'B' Unit 6 was unique for an Ontario Hydro Nuclear Unit. The significance of the improved Construction installation and Quality Assurance procedures, combined with those of Operations is identified. Secondary side chemistry during both commissioning and later operation is reported. It will be shown that the application of ALARA (As Low As is Reasonably Achievable) concept has resulted in tighter chemical specifications being met

  14. [Characteristics of fugitive dust emission from paved road near construction activities].

    Science.gov (United States)

    Tian, Gang; Fan, Shou-Bin; Li, Gang; Qin, Jian-Ping

    2007-11-01

    Because of the mud/dirt carryout from construction activities, the silt loading of paved road nearby is higher and the fugitive dust emission is stronger. By sampling and laboratory analysis of the road surface dust samples, we obtain the silt loading (mass of material equal to or less than 75 micromaters in physical diameter per unit area of travel surface) of paved roads near construction activities. The result show that silt loading of road near construction activities is higher than "normal road", and silt loading is negatively correlated with length from construction's door. According to AP-42 emission factor model of fugitive dust from roads, the emission factor of influenced road is 2 - 10 times bigger than "normal road", and the amount of fugitive dust emission influenced by one construction activity is "equivalent" to an additional road length of approximately 422 - 3 800 m with the baseline silt loading. Based on the spatial and temporal distribution of construction activities, in 2002 the amount of PM10 emission influenced by construction activities in Beijing city areas account of for 59% of fugitive dust from roads.

  15. Application of design review in the heavy power plant industry

    International Nuclear Information System (INIS)

    Yound, N.

    1977-01-01

    The application of design review technique in a company engaged in the design and manufacture of turbo-generators for power stations, is described. One benefit arising from design review is its use as a means of design verification. (U.K.)

  16. Design and construction of a low cost 50-watt capacity ...

    African Journals Online (AJOL)

    This paper describes the design and construction of a stand-by mode 50-Watt Uninterruptible Power Supply (UPS) as an alternative power supply for electrical and electronic appliances from local materials. The development of this UPS system (a system consisting of battery source, inverter, and switching unit) is to provide ...

  17. Ultrasonic meters in the feedwater flow to recover thermal power in the reactor of nuclear power plant of Laguna Verde U1 and U2

    International Nuclear Information System (INIS)

    Tijerina S, F.

    2008-01-01

    The engineers in nuclear power plants BWRs and PWRs based on the development of the ultrasonic technology for the measurement of the mass, volumetric flow, density and temperature in fluids, have applied this technology in two primary targets approved by the NRC: the use for the recovery of thermal power in the reactor and/or to be able to realize an increase of thermal power licensed in a 2% (MUR) by 1OCFR50 Appendix K. The present article mentions the current problem in the measurement of the feedwater flow with Venturi meters, which affects that the thermal balance of reactor BWRs or PWRs this underestimated. One in broad strokes describes the application of the ultrasonic technology for the ultrasonic measurement in the flow of the feedwater system of the reactor and power to recover thermal power of the reactor. One is to the methodology developed in CFE for a calibration of the temperature transmitters of RTD's and the methodology for a calibration of the venturi flow transmitters using ultrasonic measurement. Are show the measurements in the feedwater of reactor of the temperature with RTD's and ultrasonic measurement, as well as the flow with the venturi and the ultrasonic measurement operating the reactor to the 100% of nominal thermal power, before and after the calibration of the temperature transmitters and flow. Finally, is a plan to be able to realize a recovery of thermal power of the reactor, showing as carrying out their estimations. As a result of the application of ultrasonic technology in the feedwater of reactor BWR-5 in Laguna Verde, in the Unit 1 cycle 13 it was recover an equivalent energy to a thermal power of 25 MWt in the reactor and an exit electrical power of 6 M We in the turbogenerator. Also in the Unit 2 cycle 10 it was recover an equivalent energy to a thermal power of 40 MWt in the reactor and an exit electrical power of 16 M We in the turbogenerator. (Author)

  18. Ultrasonic meters in the feedwater flow to recover thermal power in the reactor of nuclear power plant of Laguna Verde U1 and U2; Medidores ultrasonicos en el flujo de agua de alimentacion para recuperar potencia termica en el reactor de la Central Nuclear Laguna Verde U1 and U2

    Energy Technology Data Exchange (ETDEWEB)

    Tijerina S, F. [CFE, Central Laguna Verde, Km. 42.5 Carretera Cardel-Nautla, Veracruz (Mexico)]. e-mail: francisco.tijerina@cfe.gob.mx

    2008-07-01

    The engineers in nuclear power plants BWRs and PWRs based on the development of the ultrasonic technology for the measurement of the mass, volumetric flow, density and temperature in fluids, have applied this technology in two primary targets approved by the NRC: the use for the recovery of thermal power in the reactor and/or to be able to realize an increase of thermal power licensed in a 2% (MUR) by 1OCFR50 Appendix K. The present article mentions the current problem in the measurement of the feedwater flow with Venturi meters, which affects that the thermal balance of reactor BWRs or PWRs this underestimated. One in broad strokes describes the application of the ultrasonic technology for the ultrasonic measurement in the flow of the feedwater system of the reactor and power to recover thermal power of the reactor. One is to the methodology developed in CFE for a calibration of the temperature transmitters of RTD's and the methodology for a calibration of the venturi flow transmitters using ultrasonic measurement. Are show the measurements in the feedwater of reactor of the temperature with RTD's and ultrasonic measurement, as well as the flow with the venturi and the ultrasonic measurement operating the reactor to the 100% of nominal thermal power, before and after the calibration of the temperature transmitters and flow. Finally, is a plan to be able to realize a recovery of thermal power of the reactor, showing as carrying out their estimations. As a result of the application of ultrasonic technology in the feedwater of reactor BWR-5 in Laguna Verde, in the Unit 1 cycle 13 it was recover an equivalent energy to a thermal power of 25 MWt in the reactor and an exit electrical power of 6 M We in the turbogenerator. Also in the Unit 2 cycle 10 it was recover an equivalent energy to a thermal power of 40 MWt in the reactor and an exit electrical power of 16 M We in the turbogenerator. (Author)

  19. Parenting and the workplace: the construction of parenting protections in United States law.

    Science.gov (United States)

    Eichner, Maxine

    2008-08-04

    In this paper, I discuss the shortcomings of the legal protections that exist for pregnancy, breastfeeding, and parenting for United States' workers. The two main sources of protection for pregnancy and parenting in United States employment law are the Pregnancy Discrimination Act (PDA) and the Family and Medical Leave Act (FMLA). Both, I argue, contain inadequate protections for the needs of pregnant women and breastfeeding mothers, as well as their infants. I consider what it is about the way these statutes conceptualize the needs of pregnant women, mothers, and their babies, that prevents more robust protection of their needs. I then compare the minimal protection afforded American women and families with more progressive policies in other countries to highlight the possibilities that arise when the state affirmatively supports working parents and their children.

  20. Construction of tunable peptide nucleic acid junctions.

    Science.gov (United States)

    Duan, Tanghui; He, Liu; Tokura, Yu; Liu, Xin; Wu, Yuzhou; Shi, Zhengshuang

    2018-03-15

    We report here the construction of 3-way and 4-way peptide nucleic acid (PNA) junctions as basic structural units for PNA nanostructuring. The incorporation of amino acid residues into PNA chains makes PNA nanostructures with more structural complexity and architectural flexibility possible, as exemplified by building 3-way PNA junctions with tunable nanopores. Given that PNA nanostructures have good thermal and enzymatic stabilities, they are expected to have broad potential applications in biosensing, drug delivery and bioengineering.

  1. Post-construction monitoring of a Core-Loc™ breakwater using tripod-based LiDAR

    Science.gov (United States)

    Podoski, Jessica H.; Bawden, Gerald W.; Bond, Sandra; Smith, Thomas D.; Foster, James

    2010-01-01

    The goal of the technology application described herein is to determine whether breakwater monitoring data collected using Tripod (or Terrestrial) Light Detection and Ranging (T-LiDAR) can give insight into processes such as how Core-Loc™ concrete armour units nest following construction, and in turn how settlement affects armour layer stability, concrete cap performance, and armour unit breakage.  A further objective is that this information can then be incorporated into the design of future projects using concrete armour units.  The results of this application of T-LiDAR, including the challenges encountered and the conclusions drawn regarding initial concrete armour unit movement will be presented in this paper.

  2. Simulator of nuclear power plant with WWER-440 units

    International Nuclear Information System (INIS)

    Krcek, V.

    1985-01-01

    The use is discussed of simulators in the training of qualified personnel for the construction and operation of nuclear power plants. Simulators are used for training all activities and thinking processes related to the control of a nuclear reactor in the course of quasi-steady and non-steady states. The development and implementation is summed up of the construction of such a simulator for WWER-440 nuclear power plants. The main parts of the simulator include the unit control room, the computer system, the teacher's workplace and the interface system. The possibility of simulating the functions of the unit for personnel training is based on the description of the behaviour of the simulated object in form of mathematical models of its basic technological subsystems and their interrelations within the range of operating patterns. (J.C.)

  3. 200-UP-2 Operable Unit technical baseline report

    International Nuclear Information System (INIS)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The ''U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO 3 ) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO 3 Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab

  4. Design and construction of a single unit multi-function optical encoder for a six-degree-of-freedom motion error measurement in an ultraprecision linear stage

    International Nuclear Information System (INIS)

    Lee, ChaBum; Kim, Gyu Ha; Lee, Sun-Kyu

    2011-01-01

    This paper presents the method of a six-degree-of-freedom (DOF) posture measurement in a linear stage by employing a single unit of an optical encoder. The proposed optical encoder was constructed to simultaneously measure the posture along the traveling axis; angular errors, pitch, yaw and roll; and translational errors, ΔX, ΔY and ΔZ. It consists of a diffractive optical element, a corner cube, four separate two-dimensional position-sensitive detectors, four photodiodes and auxiliary optics components. The circularly polarizing interferometric technique was integrated to measure the displacement of the stage along the traveling axis in a robust manner and the resolution was estimated to be less than 0.4 nm. Two types of stages were employed for the measurement implementation, the piezoelectric transducer-driven and the ballscrew-driven, and they were feedback-controlled for the traveling axis, respectively. With a single travel of the stage, it provided a six-DOF motion error with a high resolution, less than 0.03 arcsec, 20 nm and 0.4 nm for angular errors, ΔY and ΔZ, and ΔX, respectively, at the same time. As a result, it was seen that motion errors of the stage have relevance to the driving mechanism and the whole construction of the stage

  5. Agricultural Construction Volume II. Oxy-Gas and Other Cutting/Welding Processes. Woodworking, Metals, Finishing. Instructor's Guide.

    Science.gov (United States)

    Admire, Myron; Maricle, Gary

    This guide contains instructor's materials for teaching a secondary agricultural construction course consisting of instructional units on oxy-gas and other cutting and welding processes (10 lessons), woodworking (6 lessons), metals (10 lessons), and finishing (4 lessons). The materials for each unit include student objectives, a list of…

  6. The Work Calls for Men: The Social Construction of Professionalism and Professional Education for Librarianship

    Science.gov (United States)

    Stauffer, Suzanne M.

    2016-01-01

    The leaders of the library profession in the United States in the 19th century were white, middle-class, college-educated men. They attempted to construct librarianship in the United States as an equivalent profession to the other white, masculine professions of their day. They also created education for librarianship in the same mold. They…

  7. Impacts of construction markets on firm performance and behaviors in the secondary woodworking industry, 2010-2013

    Science.gov (United States)

    Matthew S. Bumgardner; Urs Buehlmann; Albert T. Schuler; Karen M. Koenig

    2014-01-01

    Despite the severe downturn in the housing market that began in 2007, construction-related uses collectively remain the largest source of demand for appearance-grade hardwood lumber in the United States. Therefore, industry practitioners and researchers alike maintain an interest in housing and construction trends. This study investigated market conditions from the...

  8. Numerical analysis of stiffener for hybrid drive unite

    Directory of Open Access Journals (Sweden)

    Jakubovičová Lenka

    2018-01-01

    Full Text Available The matter of this article is a stress-strain analysis of hybrid drive prototype unit connected directly to convention Concrete Transit Mixer Gearbox. The unite was developed with intention to do field test on existing convection machines with possibility to use existing interfaces. The hybrid drive unit consists from electric and hydrostatic motor connected through addition mechanical transmission gearbox. The question is if today standard interface is good enough or need additional support a “stiffener”. Two engineering design were analysed. The first one includes using the stiffener to fixate the construction of hybrid drive unite connected to the planetary gear. The second one is without the stiffener. For strain-stress analysis, a finite element software ANSYS Workbench was used.

  9. Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530): Final environmental statement

    International Nuclear Information System (INIS)

    1982-02-01

    The proposed action is the issuance of operating licenses to the Arizona Public Service Company (APS, applicant) for the startup and operation of PVNGS, Units 1, 2, and 3, located in Maricopa County, about 24 km (15 mi) west of Buckeye, Arizona. The information in this statement represents the second assessment of the environmental impact associated with PVNGS Units 1, 2, and 3 pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations (10 CFR) Part 51 of the Commissions's Regulations. After receiving an application in July 1974 to construct this station, the staff carried out a review of impacts that would occur during its construction and operation. That evaluation was issued as a Final Environmental Statement/emdash/Construction Phase (FES-CP). After this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and public hearings in Phoenix, Arizona, the US Nuclear Regulatory Commission issued Construction Permits Nos. CPPR-141, CPPR-142, and CPPR-143 for the construction of PVNGS Units 1, 2, and 3. As of September 1981, the construction of Unit 1 was about 92 percent complete, Unit 2 was 68 percent complete, and Unit 3 was 26 percent complete. 11 figs., 21 tabs

  10. 40 CFR 60.2991 - What incineration units must I address in my State plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What incineration units must I address... and Compliance Times for Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Applicability of State Plans § 60.2991 What incineration units must I address in my State...

  11. Parenting and the workplace: The construction of parenting protections in United States law

    Directory of Open Access Journals (Sweden)

    Eichner Maxine

    2008-08-01

    Full Text Available Abstract In this paper, I discuss the shortcomings of the legal protections that exist for pregnancy, breastfeeding, and parenting for United States' workers. The two main sources of protection for pregnancy and parenting in United States employment law are the Pregnancy Discrimination Act (PDA and the Family and Medical Leave Act (FMLA. Both, I argue, contain inadequate protections for the needs of pregnant women and breastfeeding mothers, as well as their infants. I consider what it is about the way these statutes conceptualize the needs of pregnant women, mothers, and their babies, that prevents more robust protection of their needs. I then compare the minimal protection afforded American women and families with more progressive policies in other countries to highlight the possibilities that arise when the state affirmatively supports working parents and their children.

  12. Strategies for healthcare facilities, construction, and real estate management.

    Science.gov (United States)

    Lee, James G

    2012-05-01

    Adventist HealthCare offers the following lessons learned in improving the value of healthcare facilities, construction, and real estate management: Use an integrated approach. Ensure that the objectives of the approach align the hospital or health system's mission and values. Embrace innovation. Develop a plan that applies to the whole organization, rather than specific business units. Ensure commitment of senior leaders.

  13. GEOPOLITICS AND TRANSPORTATION. UNITED STATES AND PANAMA CANAL

    Directory of Open Access Journals (Sweden)

    Benea Ciprian Beniamin

    2009-05-01

    Full Text Available This article presents the great connection which exists between the realization of Panama Canal and the rising power on United States; and how this state, after the construction of this canal, could promote efficiently at global level its interests.

  14. Final environmental statement related to the proposed construction of Douglas Point Nuclear Generating Station, Units 1 and 2: (Docket Nos. 50-448 and 50-449)

    International Nuclear Information System (INIS)

    1976-03-01

    The proposed action is the issuance of construction permits to the Potomac Electric Power Company for the construction of the Douglas Point Nuclear Generating Station, Units 1 and 2, located in Charles County, Maryland. The exhaust steam will be cooled via a closed-cycle mode incorporating natural-draft wet cooling towers. The water used in the cooling system will be obtained from the Potomac River. Construction-related activities on the site will convert about 290 acres of the 1390 acres of forested land at the Douglas Point site to industrial use. In addition to acreage at the site, approximately 4.5 miles of transmission corridor will require about 211 acres of land for rights-of-way. This corridor will connect with 27 miles of existing rights-of-way over which a line connecting Possum Point to Burches Hill has already been approved. The installation of new transmission line, uniquely identified with Douglas Point, along the existing right-of-way will involve approximately 464 additional acres. As described in the application, the maximum river water intake will be about 97,200 gpm. Of this, a maximum of about 28,000 gpm will be lost in drift or evaporation from the cooling towers. About 700 gpm maximum of fresh well water will be consumed. It is conservatively assumed that all aquatic organisms entrained in the service water system will be killed due to thermal and mechanical shock. It is further estimated that at 97,200 gpm maximum total river water intake, the maximum impact on the striped bass fishery will be a reduction of <5%. The risk associated with accidental radiation exposure is very low. 32 figs., 59 tabs

  15. Wastewater treatment in tsunami affected areas of Thailand by constructed wetlands

    DEFF Research Database (Denmark)

    Brix, Hans; Koottatep, H.; Laugesen, C.H.

    2007-01-01

    the systems which have been built at three locations: (a) Baan Pru Teau: A newly-built township for tsunami victims which was constructed with the contribution of the Thai Red Cross. Conventional septic tanks were installed for the treatment of blackwater from each household and its effluent and grey water...... system and a system for reuse of treated wastewater. The constructed wetland system (capacity 400 m3/day) consists of vertical flow, horizontal subsurface flow, free water surface flow and pond units. Because the treatment plant is surrounded by resorts, restaurants and shops, the constructed wetland...... systems are designed with terrains as scenic landscaping. (c) Patong: A 5,000 m2 constructed wetland system has been established to treat polluted water from drainage canals which collect overflow from septic tanks and grey water from residential areas. It is envisaged that these three systems will serve...

  16. The Dangling model in the construction of compound sentences with regard to verb tenses

    Directory of Open Access Journals (Sweden)

    Mahmoud Mehravaran

    2016-01-01

    Full Text Available Abstract A sentence is the most complete syntactic unit of a language. The construction of a sentence is the most comprehensive, controversial and fascinating syntactic issue in the language grammar. The message or intention is usually conveyed through a sentence. In fact, the communicative function of a language is carried out via a sentence. A sentence can be classified in to different categories from different perspectives: semantically, constructively or performatively either with a verb or without a verb and also with regard to the construction. With regard to the construction, a sentence is either simple or compound. A simple sentence is the one with a complete meaning which only has one verb. It must be born in mind that a sentence is a complete unit whit meaning and there can be a hesitation after that. There for units of speech that have a verb without a complete meaning and there can be no silence or hesitation after them cannot be regarded as a sentence. Since they are dependent upon another sentence to be completed. They are called phrases. Such phrases can be incorporated in compound sentences make main and subordinate clauses. Compound sentences are widely discussed whit in grammatical constructions, but their types and that how have been built their various constructions are less adequately discussed. With regard to the manner of construction of compound sentences, the widest linguistic amenities can be observed in the sentences. There is not such complexity or disagreement over simple sentences but compound sentences have been less adequately investigated and there is room for more discussion and debate. Because, in some grammars, without considering the construction criteria, all sentences that are connected to one another, whit connectives are called compound sentences. This paper has precisely investigated compound sentences and has elaborated on the construction criteria of compound sentences. The study has also pointed to

  17. The 3rd power unit roofing decontamination

    International Nuclear Information System (INIS)

    Samojlenko, Yu.N.; Golubev, V.V.

    1989-01-01

    The most features of the 3rd power unit (PU) roofing decontamination are described: 1) the most active materials were thrown into the 4th PU ruins before the Ukrytie construction completion; 2) the decontamination was fulfilled using remote-controlled mechanisms and manual devices (the main part). 6 figs.; 1 tab

  18. Fusion reactor design studies: standard unit costs and cost scaling rules

    International Nuclear Information System (INIS)

    Schulte, S.C.; Bickford, W.E.; Willingham, C.E.; Ghose, S.K.; Walker, M.G.

    1979-09-01

    This report establishes standard unit costs and scaling rules for estimating costs of material, equipment, land, and labor components used in magnetic confinement fusion reactor plant construction and operation. Use of the standard unit costs and scaling rules will add uniformity to cost estimates, and thus allow valid comparison of the economic characteristics of various reactor concepts

  19. Distributed generation technologies : small turbines/fuel cells

    International Nuclear Information System (INIS)

    Skowronski, M.

    1998-01-01

    Allied Signal Power Systems Inc. is a company with 76,580 employees and $ 14 billion in sales in 1996. The company's various divisions are major players in aerospace equipment systems, commercial avionics, electronic systems, engines, automotive brake systems, safety restraint systems, turbochargers, premium car care products, chemicals plastics and advanced materials. This paper describes a developed a turbogenerator designed for use in electric power generation. The new engine is inherently simple with high reliability. Its advantages over a conventional engine include: (1) one moving part, (2) no oil system, (3) multi-fuel capability, (4) no gears or gearboxes, (5) no separate starter motor, (6) ultra low emissions, and (7) lower operating costs. Although there are relatively high costs associated with its aerospace design, consumers, the environment and the electrical system/grid could all benefit from the turbogenerator. Installation and variable costs and target markets were discussed. 3 tabs., 12 figs

  20. Monitoring large rotating machines at EDF

    International Nuclear Information System (INIS)

    Chevalier, R.; Bourgeois, P.; Le Reverend, D.

    1992-09-01

    At Electricite de France (EDF), since 1978, the operating instruments which ensure the DETECTION function, have been completed on turbogenerators by a specialized ''off-line'' vibration monitoring system, which allows a posteriori DIAGNOSIS analysis. However because of a need of a real time and more elaborated DETECTION function, the concept of the Monitoring and Diagnosis Aid Station (Poste de Surveillance et d'Aide au Diagnostic: PSAD) has been developed. It federates the processing of monitoring, organized into several functions, and includes the monitoring of turbogenerators (TGS) and reactor coolant pumps (RCP). The purpose of this paper is to present, on the one hand, the monitoring functions of TGS and RCP and on the other, the first experimental results on the behaviour of three RCP, obtained through a SAMT (Surveillance Automatisee des Machines Tournantes - Automatic monitoring of rotating machines) prototype. (authors). 2 figs., 4 tabs., 4 refs

  1. Construction of clay sealings for dumping of brown coal ash and residues from gas desulfurization units. Herstellung von Tonabdichtungen zur Deponierung von Braunkohleaschen und REA-Rueckstaenden

    Energy Technology Data Exchange (ETDEWEB)

    Kortmann, W

    1989-07-01

    With the putting into operation of flue gas scrubbers at the brown coal-fired power stations of the RWE not only 5 to 6 Mt conventional power station ash but also up to 2 Mt gypsum and water from the flue gas desulphurisation units are obtained annually, and these residues together with the ash are tipped on mixed dumps. These dumps are enclosed on all sides by a mineral sealing of clay with a thickness of at least 0.6 m. In keeping with the detailed plans for the construction and operation of mixed dumps as submitted to the competent authorities for approval, the sealing must have a permeability of K < 5x10{sup -10} m/s for the dump base and of K < 1x10{sup -10} m/s for the cover of the dump. In order to meet these high quality requirements the clay, which is obtained by opencast working with the aid of bucket wheel excavators, must first of all be crushed for construction of the sealings. In addition to the crushing of the clay to as small a lump size as possible, the adjustment of the correct sealing moisture content of the clay is of primary importance. Conditioning of the clay is effected in the conventional way by means of a pulvimixer, but also by means of a processing plant in pilot operation in the construction of clay sealings for dumps. With the aid of the processing plant clay of a high homogenisation grade is constantly available for sealing construction. The clay is spread on the base and slopes of the dump layer by layer with the aid of scraper dozers, each layer having a compacted thickness of about 20 cm. Compaction of the sealing layers is effected by heavy rammer butt rollers. In the case of highly plastic earth materials of the type used here in the construction of dumps the weight of the compacting roller and also the shape of the rammer butt are of importance. Compaction in the 1:2.5 steep dump slopes by means of a detachable roller steered by a cable has proved very satisfactory.

  2. Causes of construction cost and time overruns: The 2010 FIFA World ...

    African Journals Online (AJOL)

    the FIFA World Cup remains a sought after goal for any country. Due to the magnitude ... unit of measure, the quantitative results from measuring against original project ... already identified (Dell'Apa, 2008), the South African construction industry started ... A study completed by the International Program in the Management.

  3. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  4. Constructal tree-shaped two-phase flow for cooling a surface

    Energy Technology Data Exchange (ETDEWEB)

    Zamfirescu, C.; Bejan, A. [Duke University, Durham, NC (United States). Dept. of Mechanical Engineering and Materials Science

    2003-07-01

    This paper documents the strong relation that exists between the changing architecture of a complex flow system and the maximization of global performance under constraints. The system is a surface with uniform heating per unit area, which is cooled by a network with evaporating two-phase flow. Illustrations are based on the design of the cooling network for a skating rink. The flow structure is optimized as a sequence of building blocks, which starts with the smallest (elemental volume of fixed size), and continues with assemblies of stepwise larger sizes (first construct, second construct, etc.). The optimized flow network is tree shaped. Three features of the elemental volume are optimized: the cross-sectional shape, the elemental tube diameter, and the shape of the elemental area viewed from above. The tree that emerges at larger scales is optimized for minimal amount of header material and fixed pressure drop. The optimal number of constituents in each new (larger) construct decreases as the size and complexity of the construct increase. Constructs of various levels of complexity compete: the paper shows how to select the optimal flow structure subject to fixed size (cooled surface), pressure drop and amount of header material. (author)

  5. Proof-of-concept: 3D bioprinting of pigmented human skin constructs.

    Science.gov (United States)

    Ng, Wei Long; Qi, Jovina Tan Zhi; Yeong, Wai Yee; Naing, May Win

    2018-01-23

    Three-dimensional (3D) pigmented human skin constructs have been fabricated using a 3D bioprinting approach. The 3D pigmented human skin constructs are obtained from using three different types of skin cells (keratinocytes, melanocytes and fibroblasts from three different skin donors) and they exhibit similar constitutive pigmentation (pale pigmentation) as the skin donors. A two-step drop-on-demand bioprinting strategy facilitates the deposition of cell droplets to emulate the epidermal melanin units (pre-defined patterning of keratinocytes and melanocytes at the desired positions) and manipulation of the microenvironment to fabricate 3D biomimetic hierarchical porous structures found in native skin tissue. The 3D bioprinted pigmented skin constructs are compared to the pigmented skin constructs fabricated by conventional a manual-casting approach; in-depth characterization of both the 3D pigmented skin constructs has indicated that the 3D bioprinted skin constructs have a higher degree of resemblance to native skin tissue in term of the presence of well-developed stratified epidermal layers and the presence of a continuous layer of basement membrane proteins as compared to the manually-cast samples. The 3D bioprinting approach facilitates the development of 3D in vitro pigmented human skin constructs for potential toxicology testing and fundamental cell biology research.

  6. Utilization of BIM for automation of quantity takeoffs and cost estimation in transport infrastructure construction projects in the Czech Republic

    Science.gov (United States)

    Vitásek, Stanislav; Matějka, Petr

    2017-09-01

    The article deals with problematic parts of automated processing of quantity takeoff (QTO) from data generated in BIM model. It focuses on models of road constructions, and uses volumes and dimensions of excavation work to create an estimate of construction costs. The article uses a case study and explorative methods to discuss possibilities and problems of data transfer from a model to a price system of construction production when such transfer is used for price estimates of construction works. Current QTOs and price tenders are made with 2D documents. This process is becoming obsolete because more modern tools can be used. The BIM phenomenon enables partial automation in processing volumes and dimensions of construction units and matching the data to units in a given price scheme. Therefore price of construction can be estimated and structured without lengthy and often imprecise manual calculations. The use of BIM for QTO is highly dependent on local market budgeting systems, therefore proper push/pull strategy is required. It also requires proper requirements specification, compatible pricing database and software.

  7. 48 CFR 52.225-21 - Required Use of American Iron, Steel, and Manufactured Goods-Buy American Act-Construction...

    Science.gov (United States)

    2010-10-01

    ... applies, that all manufactured construction material in the project is manufactured in the United States...; (E) Time of delivery or availability; (F) Location of the construction project; (G) Name and address of the proposed supplier; and (H) A detailed justification of the reason for use of foreign...

  8. Hydraulic bilateral construction robot; Yuatsushiki bilateral kensetsu robot

    Energy Technology Data Exchange (ETDEWEB)

    Maehata, K.; Mori, N. [Kayaba Industry Co. Ltd., Tokyo (Japan)

    1999-05-15

    Concerning a hydraulic bilateral construction robot, its system constitution, structures and functions of important components, and the results of some tests are explained, and the researches conducted at Gifu University are described. The construction robot in this report is a servo controlled system of a version developed from the mini-shovel now available in the market. It is equipped, in addition to an electrohydraulic servo control system, with various sensors for detecting the robot attitude, vibration, and load state, and with a camera for visualizing the surrounding landscape. It is also provided with a bilateral joy stick which is a remote control actuator capable of working sensation feedback and with a rocking unit that creates robot movements of rolling, pitching, and heaving. The construction robot discussed here, with output increased and response faster thanks to the employment of a hydraulic driving system for the aim of building a robot system superior in performance to the conventional model designed primarily for heavy duty, proves after tests to be a highly sophisticated remotely controlled robot control system. (NEDO)

  9. Prefabricated Construction using Digitally Integrated Industrial Manufacturing

    Directory of Open Access Journals (Sweden)

    Harry Giles

    2012-10-01

    Full Text Available The paper describes research being carried out in relation to prefabricated high density affordablehousing under a grant from the Partnership for the Advancement of Technology in Housing(PATH and the National Science Foundation (NSF in the USA. The objective is to demonstratehow a new paradigm for the conceptualization and construction of buildings can be conceivedof as an entirely factory based process that creates advantages for construction through industrialsystems technology transfer. Our approach is intended to transform design methodologythrough demonstrating how alternative construction concepts, using entirely pre-manufacturedvolumetric units, can be adopted. This involves digital modeling that facilitates parametric variationsfor creating customized prefabricated products from design conceptualization through tofinal product delivery. The paper discusses key areas under investigation in relation to a manufacturingparadigm used in the automotive industry that integrates virtual prototyping and industrialmanufacturing systems. Our research explores a type of monocoque volumetric unit prefabricatedin steel, which will be pre-finished as part of a modular factory-built approach usingindustrialized methodologies that will facilitate customized manufacture of a high quality energyefficient product for affordable housing.The paper addresses the automotive industry methods of manufacture that have served increasedautomobile performance and economics through mass production for over a century. In starkcontrast, the building industry and in particular the housing industry is still a century behind. It issuggested that a move away from tradition will require an industry wide initiative, just like HenryFord led the way with mass production. By embracing the increasing sophistication and capabilitythat digital technology offers, it is shown how digital tools are implemented towards masscustomization in house design using virtual modeling in the

  10. Trench design and construction techniques for low-level radioactive waste disposal

    International Nuclear Information System (INIS)

    Tucker, P.G.

    1983-02-01

    This document provides information on trench design and construction techniques which can be used in the disposal of LLW by shallow land burial. It covers practices currently in use not only in the LLW disposal field, but also methods and materials being used in areas of hazardous and municipal waste disposal which are compatible with the performance objectives of 10 CFR Part 61. The complexity of a disposal site and its potential problems dictate the use of site-specific characteristics when designing a LLW disposal trench. This report presents the LLW disposal trench as consisting of various elements or unit processes. The term unit processes is used as it more fully relays the impact of the designer's choice of methods and materials. When choosing a material to fulfill the function of a certain trench element, the designer is also stipulating a portion of his operational procedure which must be compatible with the disposal operation as a whole. Information is provided on the properties, selection, and installation of various materials such as bentonite, soil-cement, polymeric materials, asphaltic materials, and geotechnical fabrics. This is not intended to outline step-by-step procedures. Basically, three time frames are addressed with respect to construction techniques; preoperational, operational, and postoperational. Within each of these time frames there are certain construction techniques which can be employed by the designer to enhance the overall ease of construction and ultimate success of the disposal facility. Among the techniques presented are precontouring the disposal area, alignment of the trench axis, sloping the trench bottom, incremental excavation, and surface water (runoff) management

  11. Low-cost inertial measurement unit.

    Energy Technology Data Exchange (ETDEWEB)

    Deyle, Travis Jay

    2005-03-01

    Sandia National Laboratories performs many expensive tests using inertial measurement units (IMUs)--systems that use accelerometers, gyroscopes, and other sensors to measure flight dynamics in three dimensions. For the purpose of this report, the metrics used to evaluate an IMU are cost, size, performance, resolution, upgradeability and testing. The cost of a precision IMU is very high and can cost hundreds of thousands of dollars. Thus the goals and results of this project are as follows: (1) Examine the data flow in an IMU and determine a generic IMU design. (2) Discuss a high cost IMU implementation and its theoretically achievable results. (3) Discuss design modifications that would save money for suited applications. (4) Design and implement a low cost IMU and discuss its theoretically achievable results. (5) Test the low cost IMU and compare theoretical results with empirical results. (6) Construct a more streamlined printed circuit board design reducing noise, increasing capabilities, and constructing a self-contained unit. Using these results, we can compare a high cost IMU versus a low cost IMU using the metrics from above. Further, we can examine and suggest situations where a low cost IMU could be used instead of a high cost IMU for saving cost, size, or both.

  12. Chapter 2. The production units

    International Nuclear Information System (INIS)

    1998-01-01

    In the second chapter of this CD ROM the production units of the Slovak Electric, Plc. (Slovenske elektrarne, a.s.), are presented. It consist of next paragraphs: (1) Nuclear power plants (A-1 Nuclear Power Plant (History, Technological scheme, basic data are presented); V-1, V-2 Bohunice Nuclear Power Plant (History 1972-1985, technological scheme; nuclear safety, radiation protection, heat supply, international co-operation and basic data are presented); Mochovce Nuclear Power Plant (History 1980-1998, technological scheme, construction completion, milestones of commissioning, safety and environmental protection as well as basic data are included). (2) Conventional sources of energy (Vojany fossil power plant (History 1959-1992, Technological units of power plant, Impact of operation on the environment, Plant of Vojany FPP Renewal and Reconstruction, Basic data are listed), Novaky fossil power plant (History 1949-1998, Technological scheme, current investment construction, basic data, Handlova heating plant). Kosice Combined Heat Power Plant (History 1960-1995, technological scheme, State metrology centre, acredited chemical laboratory, basic data). (3) Hydroelectric power plants (Trencin HPPs: Cierny Vah pumped storage HPP, Liptovska Mara HPP, Orava HPP, Sucany HPP, Miksova HPP, Nosice HPP, Velke Kozmalovce HPP, Gabcikovo HPP, Dubnica HPP, Nove Mesto n/V HPP, Madunice HPP, Kralova HPP) and Dobsina HPPs: (Dobsina HPP, Ruzin HPP, Domasa HPP, small HPPs) are presented

  13. 40 CFR 60.1320 - How do I monitor the load of my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... municipal waste combustion unit? 60.1320 Section 60.1320 Protection of Environment ENVIRONMENTAL PROTECTION... of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After... Monitoring Requirements § 60.1320 How do I monitor the load of my municipal waste combustion unit? (a) If...

  14. 40 CFR 62.15145 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a) You...

  15. An optimal reactive power control strategy for a DFIG-based wind farm to damp the sub-synchronous oscillation of a power system

    DEFF Research Database (Denmark)

    Zhao, Bin; Li, Hui; Wang, Mingyu

    2014-01-01

    This study presents the auxiliary damping control with the reactive power loop on the rotor-side converter of doubly-fed induction generator (DFIG)-based wind farms to depress the sub-synchronous resonance oscillations in nearby turbogenerators. These generators are connected to a series capaciti...

  16. Subsynchronous resonance - identification of the resonance modes in systems with series compensation; Ressonancia subsincrona - identificacao dos modos ressonantes em sistemas dotados de compensacao-serie

    Energy Technology Data Exchange (ETDEWEB)

    Rocha, J J [Brasilia Univ., DF (Brazil). Dept. de Engenharia Eletrica; Camargo, B C.C. [Santa Catarina Univ., Florianopolis, SC (Brazil). Dept. de Engenharia Eletrica

    1988-12-31

    This work shows the phenomenon and mechanism of the subsynchronous resonance, as well as it presents the modelling and simulation of a electromechanics system to verify the adequacy of the use of series capacitor in systems that has turbogenerators 4 refs., 7 figs., 3 tabs.

  17. Authorization procedure for the construction and operation of nuclear installations within certain non-member states of the European Communities. Canada, Spain, Sweden, Switzerland, the United States and Yugoslavia 1975

    International Nuclear Information System (INIS)

    Amaducci, Sandro; Dider, J.M.

    1976-01-01

    In all the countries considered except Switzerland, a formal site approval for a future nuclear installation is necessary before any request for construction can be placed with the licensing authority. Moreover, two separate authorizations - one for construction and the other for operation - are needed before full operations can begin. It is only in Sweden that no express application is required for a full operating authorization. Between the respective authorizations for construction and full operation, there are, in Canada, Spain and Sweden, one or more intermediate formal authorizations to be delivered by the licensing authority, and this alongside the progressive full loading of the nuclear installation concerned. As regards the decision-making level, the relevant authorizations are generally issued at centralized level, except in Yugoslavia, and to a certain extent, in Switzerland - this being because of the federal structure of these countries. Furthermore, public hearings are organized during the authorization procedure, except in Switzerland and Yugoslavia. Finally, there are steps which are very particular to the country concerned. In Canada, there is an informal 'application' and discussion between the 'applicant' and the licensing authority before the real procedure begins, whereas in the United States, the Attorney General carried out an anti-trust review at a pre-procedural stage. Further it is only in the latter country that time requirements are fixed by regulations for certain steps of the procedure

  18. Corrective action management unit application for the Environmental Restoration Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    Evans, G.C.

    1994-06-01

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.

  19. Corrective action management unit application for the Environmental Restoration Disposal Facility

    International Nuclear Information System (INIS)

    Evans, G.C.

    1994-06-01

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ''Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.'' The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ''package'' for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package

  20. 9 CFR 98.16 - The embryo collection unit.

    Science.gov (United States)

    2010-01-01

    ... impervious to moisture and constructed of materials that can withstand repeated cleaning and disinfection. If... materials that can withstand repeated cleaning and disinfection. If the outdoor area also has walls or a... withstand repeated cleaning and disinfection. (c) Embryo processing area. The embryo collection unit must...

  1. Part-Load Performance of a Wet Indirectly Fired Gas Turbine Integrated with an Organic Rankine Cycle Turbogenerator

    DEFF Research Database (Denmark)

    Pierobon, Leonardo; Nguyen, Tuong-Van; Mazzucco, Andrea

    2014-01-01

    Over the last years, much attention has been paid to the development of efficient and low-cost power systems for biomass-to-electricity conversion. This paper aims at investigating the design- and part-load performance of an innovative plant based on a wet indirectly fired gas turbine (WIFGT......-design performance is governed by the efficiency characteristics of the compressor and turbine serving the gas turbine unit....

  2. Optimization planning for the construction of the U.S. EPR

    International Nuclear Information System (INIS)

    Phillips, M. K.

    2008-01-01

    As utilities and project developers in the United States embark on a new nuclear plant construction endeavor, the industry must have the confidence and support of all stakeholders. To gain this confidence and support, cost and schedule certainty must be established. Therein lies the challenge. The owner will insist that constructors and suppliers deliver new plants on time and within project budgets. This will be a significant effort given the limited number of qualified equipment and commodity suppliers, and a shortage of experienced craft and supervision. In an effort to manage construction risk and ensure cost and schedule certainty, the AREVA Construction Management Team has lead the development of a construction strategy that includes advanced construction methods and technologies such as 3-D modeling, detailed planning and scheduling, open-top construction, state-of-the-art fabrication practices, specialty transportation and lifting methods, and pre-assembly and modularization, otherwise referred to as construction optimization. Unlike off-shore platforms, industrial process plants, and ships where piping and components can be integrated into the steel building structure, optimized construction of nuclear plants must consider reinforced concrete walls and slabs that serve as the building structure, and provide radiation shielding and containment of nuclear systems. These differences in design and construction require a significantly different analysis approach that is focused on rooms of a building rather than the whole building or plant. This paper will focus on the process developed and currently being implemented by the U.S. EPR (Evolutionary Power Reactor) Construction Team to identify opportunities for optimization and then to evaluate and select the rooms or areas of the plant where pre-assembly or modularization will provide the greatest benefit to construction cost and schedule certainty. Key measures for comparison and selection are critical path

  3. Constructing Aligned Assessments Using Automated Test Construction

    Science.gov (United States)

    Porter, Andrew; Polikoff, Morgan S.; Barghaus, Katherine M.; Yang, Rui

    2013-01-01

    We describe an innovative automated test construction algorithm for building aligned achievement tests. By incorporating the algorithm into the test construction process, along with other test construction procedures for building reliable and unbiased assessments, the result is much more valid tests than result from current test construction…

  4. Lessons Learned from Past and Ongoing Construction Projects

    International Nuclear Information System (INIS)

    Tabatabai, Omid

    2011-01-01

    Full text of publication follows: The nuclear industry in the U.S. faced many construction quality and design issues in the 1970's and 1980's. In 1984, the NRC issued NUREG-1055, 'Improving Quality and the Assurance of Quality in the Design and Construction of Nuclear Power Plants,' to document the lessons learned from nuclear power plant (NPP) construction in the U.S. In recent years, several countries have begun either planning for or actually constructing new NPPs. For instance, in the U.S., the nuclear industry has submitted several combined license and design certification applications to the NRC for licensing reviews and approval to build 30+ new NPP units. Latest construction experience from countries that are currently building new NPPs indicate that these countries are dealing with challenges that are similar to those issues that caused major quality assurance problems, delays, or even termination of several projects in U.S. in the 70's and 80's. The U.S. NRC is pro-actively taking measures to improve its regulatory programs as well as construction oversight activities before new NPPs construction begin in the U.S. In late 2007, the U.S. NRC's Office of New Reactors established a construction experience program (ConE) to obtain and evaluate construction and operating experience events and to identify the lessons learned from these events. In March 2009, the NRC published an Office Instruction to provide a process for incorporating the lessons learned and insights from the design, construction, and operation of the international and domestic NPPs into the licensing reviews, inspections, and construction of new reactors in the U.S. Additionally, the ConE program staff developed a Web-enabled database to store, manage, and make construction experience information available to all NRC technical reviewers as well as inspectors. Because this database contains information from other countries' regulators that are considered

  5. Paranormal Beliefs and Their Implications in University Students from Finland and the United States.

    Science.gov (United States)

    Tobacyk, Jerome J.; Pirttila-Backman, Anna-Maija

    1992-01-01

    Compares 117 Finnish and 351 southern U.S. college students for the following: (1) paranormal beliefs; (2) personality adjustment constructs (anomie, death concerns, alienation, and death threat); and (3) relationships between the beliefs and constructs. The secularization process, further advanced in Finland than the United States, moderates…

  6. Design parameters for waste effluent treatment unit from beverages production

    Directory of Open Access Journals (Sweden)

    Mona A. Abdel-Fatah

    2017-09-01

    Full Text Available Based on a successful experimental result from laboratory and bench scale for treatment of wastewater from beverages industry, an industrial and efficient treatment unit is designed and constructed. The broad goal of this study was to design and construct effluent, cost effective and high quality treatment unit. The used technology is the activated sludge process of extended aeration type followed by rapid sand filters and chlorination as tertiary treatment. Experimental results have been considered as the basis for full scale design of the industrial capacity of 1600 m3/day treatment plant. Final effluent characteristics after treatment comply with Egyptian legalizations after reducing COD and BOD5 by about 97% and 95% respectively. So it is recommended to reuse treated effluent in textile industry in dyeing process.

  7. Structural Evaluation of the Second Oldest Glued-Laminated Structure in the United States

    Science.gov (United States)

    Douglas R. Rammer; Jorge de Melo Moura

    2013-01-01

    The second glued-laminated structure built in the United States was constructed at the USDA Forest Products Laboratory (FPL) in 1934 to demonstrate the performance of wooden arch buildings. After decades of use the structure was decommissioned in 2010. Shortly after construction, researchers structurally evaluated the glued-laminated arch structure for uniform loading...

  8. Construction Management of Electromechanical Engineering Project in Petrochemical Construction

    Directory of Open Access Journals (Sweden)

    Xi Tao

    2017-03-01

    Full Text Available Petrochemical industry as a basic industry, occupies a pivotal position in the national economy, with the continuous development of science and technology, electromechanical automation in the petrochemical industry has been widely used to save a lot of labor but also greatly improve the oil Chemical industry production efficiency. Therefore, in the construction of petrochemical industry, mechanical and electrical engineering as part of it. It plays a vital role. Petrochemical industry with the production of high temperature and high pressure and flammable and explosive gas, can strengthen the construction of mechanical and electrical engineering specialization and construction management of scientific, has become the relationship between the smooth development of mechanical and electrical engineering and engineering quality of the key, A direct impact on the petrochemical construction of the overall construction quality. To this end, it is necessary for the construction of petrochemical construction of electromechanical engineering construction management to promote the construction of mechanical and electrical engineering management level gradually increased. This article on the machine Electric engineering project construction management were discussed with a view to the petrochemical construction in the relevant aspects of the need to provide reference for reference.

  9. The economic aspect of transition to power units with supercritical steam parameters

    Energy Technology Data Exchange (ETDEWEB)

    V.R. Kotler

    2007-09-15

    Information on the development and use of power units for supercritical and ultrasupercritical steam parameters in the United States, as well as in Europe and Japan, is presented. It is shown that increasing the parameters of steam reduces not only the fuel consumption, but also the specific emissions of toxic and greenhouse gases. Results of a calculation carried out at the EPRI (the United States) are presented, which show that it is advisable to construct power units for supercritical parameters only at certain (sufficiently high) price of the fuel being fired.

  10. Final environmental statement related to construction of Cherokee Nuclear Station, Units 1, 2, and 3: (Docket Nos. STN 50-491, STN 50-492, and STN 50-493)

    International Nuclear Information System (INIS)

    1975-10-01

    The proposed action is the issuance of a construction permit to the Duke Power Company for the construction of the Cherokee Nuclear Station (CNS) Units 1, 2, and 3 located in Cherokee County, South Carolina. A total of 2263 acres will be removed from public use for the CNS site. Construction-related activities on the site will disturb about 751 acres. Approximately 654 acres of land will be required for transmission line right-of-way, and a railroad spur will affect 83 acres. This constitutes a minor regional impact. No significant environmental impacts are anticipated from normal operational releases of radioactive materials. The total annual dose to the US population (total body plus thyroid) from operation of the plant is 210 man-rems which is less than the normal fluctuations in the background dose this population would receive. The occupational dose is approximately 1400 man-rems/year. The heat dissipation system will require a maximum water makeup of 55,814 gpm, of which 50,514 gpm will be consumed due to drift and evaporative losses. This amount represents 4.5% of the mean monthly flow and 23.8% of the low flow of the Broad River. The cooling tower blowdown and chemical effluents from the station will increase the dissolved solids concentration in the river by a maximum of 44 ppM. The thermal alterations and increases in total dissolved solids concentration will not significantly affect the aquatic productivity of the river. 114 refs., 25 figs., 46 tabs

  11. Radiation processing of polyethylene and polymethylmethacrylate for construction industry and architecture

    International Nuclear Information System (INIS)

    Knizhnik, E.I.; Gordienko, V.P.; Il'yenko, R.E.; Onisko, A.D.; AN Ukrainskoj SSR, Kiev. Inst. Fizicheskoj Khimii)

    1983-01-01

    Radiation processing of relief-forming molds made of filled high-density polyethylene enables them to be used for shaping concrete and ferroconcrete barrier constructions of buildings; radiation processing of polymethylmethacrylate in unit form makes it possible to produce large-size decorative elements of building interior. The subject is discussed and examples presented. (author)

  12. THE MURMANSK INITIATIVE - RF: COMPLETING CONSTRUCTION AND START-UP TESTING

    International Nuclear Information System (INIS)

    CZAJKOWSKI, C.; BOWERMAN, B.S.; DYER, R.S.; SORLIE, A.A.; WESTER, D.

    1998-01-01

    The Murmansk Initiative - RF was instigated to address Russia's ability to meet the London Convention prohibiting ocean dumping of radioactive waste. The Initiative, under a trilateral agreement, will upgrade an existing low-level liquid radioactive waste treatment facility, increasing capacity from 1,200 m 3 /year to 5,000 m 3 /year, and expand the capability to treat liquids containing salt (up to 10 g/L). The three parties to the agreement, the Russian Federation, Norway, and the US, have split the costs for the project. All construction has been provided by Russia. Construction of mechanical systems (piping and valves, pumps, sorbent columns, settling tanks, surge tanks) is nearly complete, with instrumentation and control (I+C) systems the last to be installed. Delays to the I+C installation have occurred because changes in system specifications required some additional US-supplied computer control equipment to be purchased, and clearance through customs (both US and Russian) has been slow. Start-up testing has been limited to testing of some isolated sub-systems because of the delays in I+C installation. Final construction activities are also hampered by the current state of the Russian economy. The specific impact has been completion of the cementation unit, which was not funded under the trilateral agreement (but funded by the Russian government). Russian regulatory authorities have stated that final licensing for expanded capacity (5,000 m 3 /year) will not be given until the cementation unit is on-line

  13. Immigrant-Responsive Multicultural Education in the United States

    Science.gov (United States)

    Oikonomidoy, Eleni

    2011-01-01

    In this article, it is proposed that systematic attention to certain characteristics of newcomer immigrant students' identity construction could enhance the premises of the field of multicultural education in the United States, with immigrant-responsive insights. Elements from the scholarship in the sociology of migration, which attend to critical…

  14. Masonry. Teacher's Guide. Building Maintenance Units of Instruction.

    Science.gov (United States)

    Barnes, Bill

    This teaching guide on masonry building maintenance, one in a series of six publications designed for building maintenance instructors in Texas, is designed to give students an understanding of masonry construction. Introductory material provides teachers with information on use of the units of instruction and personalization and localization of…

  15. New cost saving technologies: microturbines - a new way to generate power

    International Nuclear Information System (INIS)

    Kline, R.

    1999-01-01

    The use of microturbines for power distribution was discussed and illustrated by a series of overhead viewgraphs which accompanied this presentation. The paper presented an explanation of how microturbines work and how they can be used for onsite distributed generation. Microturbines were described as being portable and compact gas turbines of less than 100 kW, with high speed single shaft design. One of their main advantages are their capability for remote monitoring and operation. Results of microturbine testing at Suncor's Joffre Plant were presented. Some of the advantages of using Mercury Electric's IPP and TurboGenerator Distributor were also discussed. The operating modes for the unit include: (1) peak shaving for larger load customers, (2) cogeneration for base load applications, (3) emergency/standby/UPS applications, and (4) portable generation for temporary power. The unit can be used in commercial and industrial buildings and is also ideal for remote locations. The environmental benefits associated with the unit is that it can be used for cogeneration power and can utilize waste gas flares which have been associated with harmful emissions to the atmosphere. 7 figs

  16. Construction gets underway on Hungary's Modern Vault Dry Store

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    A construction licence has recently been granted for a Modular Vault Dry Store (MVDS) for spent fuel at the Paks reactor site in Hungary. The store will be used for medium term (50 years) storage of spent fuel from four VVER-440 reactors. It is anticipated that storage capacity for 1350 fuel assemblies will be available by 1996. Two further construction phases will take the capacity to 4950, covering the first ten years of reactor operation. The design provides for further extension to accommodate a total 15000 assemblies, corresponding to 30 years of reactor operation. The MVDS has developed out of the first application of dry store technology to spent Magnox reactor fuel at the Wylfa power station in the United Kingdom 25 years ago. (UK)

  17. 40 CFR Table 1 to Subpart Aaaa of... - Emission Limits for New Small Municipal Waste Combustion Units

    Science.gov (United States)

    2010-07-01

    ... Waste Combustion Units 1 Table 1 to Subpart AAAA of Part 60 Protection of Environment ENVIRONMENTAL... Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced... Combustion Units For the following pollutants You must meet thefollowing emission limits a Using the...

  18. Proceedings of the 6th Nordic Conference on Construction Economics and Organisation

    DEFF Research Database (Denmark)

    WORKER IN DENMARK Brunes, F. & Mandell, S.: QUANTITY CHOICE IN UNIT PRICE CONTRACT PROCUREMENTS Bröchner, J.: DOES CONSTRUCTION PARTNERING RESEARCH REFLECT CHANGES IN SOCIETY? Hampson, K. & Kraatz, J.: LEVERAGING R&D INVESTMENT FOR THE AUSTRALIAN BUILT ENVIRONMENT Haugbølle, K. & Forman, M.: COUPLING...

  19. The contemporary cement cycle of the United States

    Science.gov (United States)

    Kapur, A.; Van Oss, H. G.; Keoleian, G.; Kesler, S.E.; Kendall, A.

    2009-01-01

    A country-level stock and flow model for cement, an important construction material, was developed based on a material flow analysis framework. Using this model, the contemporary cement cycle of the United States was constructed by analyzing production, import, and export data for different stages of the cement cycle. The United States currently supplies approximately 80% of its cement consumption through domestic production and the rest is imported. The average annual net addition of in-use new cement stock over the period 2000-2004 was approximately 83 million metric tons and amounts to 2.3 tons per capita of concrete. Nonfuel carbon dioxide emissions (42 million metric tons per year) from the calcination phase of cement manufacture account for 62% of the total 68 million tons per year of cement production residues. The end-of-life cement discards are estimated to be 33 million metric tons per year, of which between 30% and 80% is recycled. A significant portion of the infrastructure in the United States is reaching the end of its useful life and will need to be replaced or rehabilitated; this could require far more cement than might be expected from economic forecasts of demand for cement. ?? 2009 Springer Japan.

  20. Investigation of the Bilibin reactor operation in the regime of automatic power and frequency control in isolated power system

    International Nuclear Information System (INIS)

    Sankovskij, G.A.; Molochkov, V.I.; Dolgov, V.V.; Soldatov, G.E.; Minashin, M.E.

    1981-01-01

    The results of experimental investigations of the power unit operation of the Bilibin nuclear power and heating plant (BNPHP) in the regime of automatic power and frequency control in an isolated power system are presented. The BNPHP comprises four similar power units. Each unit includes a steam generating setup - the channel water-graphite reactor with tubular fuel elements with natural circulation of boiling water at all the power levels as well as a turbosetup with two heat selectors and a turbogenerator. The turbine operates on dry saturated steam (with intermediate separation) which is brought from the drum-separator of the reactor natural circulation circuit. The BNPHP operates according to the controller schedule since the start-up of the first power unit. The BNPHP unit power varifies within the 50-100% range 3-4 times per day (by the number of maxima in the schedule of the power system loadings). Two design flowsheets of the unit power control and dynamic characteristics of the system for both vatiants are considered. It is concluded that both investigated automatic control systems are seviceable and deviations of the reactor parameters within the transients are not dangerous for heat release from the core. The plant is better shielded from external mainly short-term perturbations coming from the power system when the system operates in accordance with the first variant of the flowsheet [ru

  1. Insect control in socialist China and the corporate United States: the act of comparison, the tendency to forget, and the construction of difference in 1970s U.S.-Chinese scientific exchange.

    Science.gov (United States)

    Schmalzer, Sigrid

    2013-06-01

    In 1975, a delegation of U.S. entomologists traveled to socialist China to observe Chinese insect control science. Their overwhelmingly positive reports highlighted in relief the pernicious effects of pesticide corporations on U.S. agriculture; some entomologists hoped this would goad the United States to catch up to China in environmentally sensible insect control practices. Of course, insect control in socialist China carried its own political baggage, some of which-for example, mass mobilization and self-reliance--the state made highly visible to visitors, and some of which--for example, harsh treatment of scientists--it sought to obscure. For both the U.S. and the Chinese participants, the act of comparison itself was of primary significance in the exchange, allowing them to construct socialist Chinese science as refreshingly different from U.S. science. At the same time, however, this construction of difference meant forgetting the much longer transnational history in which U.S. and Chinese entomology had been intertwined.

  2. Reduction of construction periods of PWRs by optimization of detailed sequence planning

    International Nuclear Information System (INIS)

    Stocker, W.; Leverenz, R.

    1991-01-01

    The construction of PWR's is an enterprise with high investment costs, in total up to three billion US$ and with long construction periods of five years and more. Besides the results reached by the intensive standardization, a further reduction of the construction period is possible by optimization of detailed sequence planning and interfaces of work units. During the execution of the three German Convoy plants ISAR 2, EMSLAND and NECKARWESTHEIM 2, the contractual construction periods were shortened between 4 and 8 months. These reductions were reached after individual investigations by measures like advanced finishing work activities; erection of an increased amount of prefabricated pipings; rearrangement of erection sequences; overlapping of piping erection and electrical installation; reduction of plant commissioning period. All these measures support directly the reduction of the total investment cost of a plant, as already demonstrated by the Convoy plants. (author). 8 figs

  3. Structural Performance of the Second Oldest Glued-Laminated Structure in the United States

    Science.gov (United States)

    Douglas R. Rammer; Jorge de Melo Moura; Robert J. Ross

    2014-01-01

    The second glued-laminated structure built in the United States was constructed at the USDA Forest Products Laboratory (FPL) in 1934 to demonstrate the performance of wooden arch buildings. After 75 years of use the structure was decommissioned in 2010. Shortly after construction, researchers structurally evaluated the glued-laminated arch structure for uniform loading...

  4. WIPP: construction and progress on a successful nuclear waste repository

    International Nuclear Information System (INIS)

    Cooper, W.R.; Sankey, C.A.

    1985-01-01

    The Department of Energy is constructing the Waste Isolation Pilot Plant (WIPP) in Southeastern New Mexico. The facility will retrievably store transuranic waste from defense activities of the United States and conduct experiments with Defense high-level waste which will be retrieved at the end of the experiments. This paper describes the progress and the present status of activities at WIPP. 4 refs

  5. Environmental assessment of sewer construction in small to medium sized cities using life cycle assessment

    OpenAIRE

    Petit, Anna

    2014-01-01

    In a world with an increasing urban population, analysing the construction impacts of sanitation infrastructures through Life Cycle Assessment (LCA) is necessary for defining the best environmental management strategies. In this study, the environmental impacts of one linear meter of sewer constructive solution were analysed for different pipe materials and diameters used in Southern Europe; a unit of different sewer appurtenances (pump, manhole and inspection chamber) was also considered. Th...

  6. Constructing Dynamic Event Trees from Markov Models

    International Nuclear Information System (INIS)

    Paolo Bucci; Jason Kirschenbaum; Tunc Aldemir; Curtis Smith; Ted Wood

    2006-01-01

    In the probabilistic risk assessment (PRA) of process plants, Markov models can be used to model accurately the complex dynamic interactions between plant physical process variables (e.g., temperature, pressure, etc.) and the instrumentation and control system that monitors and manages the process. One limitation of this approach that has prevented its use in nuclear power plant PRAs is the difficulty of integrating the results of a Markov analysis into an existing PRA. In this paper, we explore a new approach to the generation of failure scenarios and their compilation into dynamic event trees from a Markov model of the system. These event trees can be integrated into an existing PRA using software tools such as SAPHIRE. To implement our approach, we first construct a discrete-time Markov chain modeling the system of interest by: (a) partitioning the process variable state space into magnitude intervals (cells), (b) using analytical equations or a system simulator to determine the transition probabilities between the cells through the cell-to-cell mapping technique, and, (c) using given failure/repair data for all the components of interest. The Markov transition matrix thus generated can be thought of as a process model describing the stochastic dynamic behavior of the finite-state system. We can therefore search the state space starting from a set of initial states to explore all possible paths to failure (scenarios) with associated probabilities. We can also construct event trees of arbitrary depth by tracing paths from a chosen initiating event and recording the following events while keeping track of the probabilities associated with each branch in the tree. As an example of our approach, we use the simple level control system often used as benchmark in the literature with one process variable (liquid level in a tank), and three control units: a drain unit and two supply units. Each unit includes a separate level sensor to observe the liquid level in the tank

  7. Nursing professional practice environments: setting the stage for constructive conflict resolution and work effectiveness.

    Science.gov (United States)

    Siu, Heidi; Spence Laschinger, Heather K; Finegan, Joan

    2008-05-01

    The aim of this study was to examine the impact of nurses' perceived professional practice environment on their quality of nursing conflict management approaches and ultimately their perceptions of unit effectiveness from the perspective of Deutsch's theory of constructive conflict management. Rising reports of hostility and conflict among Canadian nurses are a concern to nurses' health and the viability of effective patient care delivery. However, research on the situational factors that influence nurses' ability to apply effective conflict resolution skills that lead to positive results in practice is limited. A nonexperimental, predictive design was used in a sample of 678 registered nurses working in community hospitals within a large metropolitan area in Ontario. The results supported a modified version of the hypothesized model [chi2(1) = 16.25, Goodness of Fit = 0.99, Comparative Fit Index = 0.98, Root-Mean-Square Error of Approximation = 0.15] linking professional practice environment and core self-evaluation to nurses' conflict management and, ultimately, unit effectiveness. Professional practice environment, conflict management, and core-self evaluation explained approximately 46.6% of the variance in unit effectiveness. Positive professional practice environments and high core self-evaluations predicted nurses' constructive conflict management and, in turn, greater unit effectiveness.

  8. Specifications for Supplementary Classroom Units, Stressed Skin Panel.

    Science.gov (United States)

    Waring, Robert B.; And Others

    Complete outline specifications are given for the construction of supplementary classroom units using stressed skin panels. Sections included are--(1) concrete and related work, (2) masonry, (3) structural and miscellaneous metal, (4) curtain walls and metal windows, (5) carpentry and related work, (6) roofing, sheet metal, and related work, (7)…

  9. 40 CFR 60.2555 - What combustion units are exempt from my State plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What combustion units are exempt from... Construction On or Before November 30, 1999 Applicability of State Plans § 60.2555 What combustion units are... metals which are reclaimed and reused as catalysts or used to produce commercial grade catalysts. (5...

  10. Modularization for ground engineering construction in the Anyue Gasfield, Sichuan Basin, with the designed annual gas processing capacity of six billion m3

    Directory of Open Access Journals (Sweden)

    Chaoming Chen

    2016-12-01

    Full Text Available In the Anyue Gasfield, Sichuan Basin, the Lower Cambrian Longwangmiao Fm gas reservoir in Moxi Block has enormous natural gas reserves, and it is a typical three-high (high temperature, high pressure, and high flow rate sour gas field. Its ground engineering project (with the designed gas processing capacity of 60 × 108 m3/a is characterized by high processing rate of each unit, complex process control, large construction load, restricted construction site and tight schedule. Based on the traditional engineering construction mode, however, it is difficult to complete the project design and construction within 16 months. In view of this, the design concept of unit large-scale modularization was introduced to implement “normalized design, scale purchase, factory-like prefabrication and modularized construction” and develop the modularization technology of large-scale surface engineering construction. This modularization technology is performed as follows. First, the modularized units are laid out reasonably according to the technological process. Second, the layout of modularized units is usually superimposed in the multi-layer framework. Third, those equipments with the same or similar operational modes, medium properties, functional characteristics and installation requirements are concentrated in the pattern of a module. Fourth, escape passageway is specially set up. Fifth, room for installation, maintenance and repair of large equipments is reserved. And sixth, transportation and hoisting requirements of modules are taken into consideration sufficiently. This technology is contributive to the improvement of design quality, effective shortening of design period, reduction of field working load, decrease of safety management risk of on-site installation, increase of production efficiency, conservation of land occupation and diminishment of construction investment. It plays a reference role in the modularized construction of surface

  11. Construction of hybrid photosynthetic units using peripheral and core antennae from two different species of photosynthetic bacteria: detection of the energy transfer from bacteriochlorophyll a in LH2 to bacteriochlorophyll b in LH1.

    Science.gov (United States)

    Fujii, Ritsuko; Shimonaka, Shozo; Uchida, Naoko; Gardiner, Alastair T; Cogdell, Richard J; Sugisaki, Mitsuru; Hashimoto, Hideki

    2008-01-01

    Typical purple bacterial photosynthetic units consist of supra-molecular arrays of peripheral (LH2) and core (LH1-RC) antenna complexes. Recent atomic force microscopy pictures of photosynthetic units in intact membranes have revealed that the architecture of these units is variable (Scheuring et al. (2005) Biochim Bhiophys Acta 1712:109-127). In this study, we describe methods for the construction of heterologous photosynthetic units in lipid-bilayers from mixtures of purified LH2 (from Rhodopseudomonas acidophila) and LH1-RC (from Rhodopseudomonas viridis) core complexes. The architecture of these reconstituted photosynthetic units can be varied by controlling ratio of added LH2 to core complexes. The arrangement of the complexes was visualized by electron-microscopy in combination with Fourier analysis. The regular trigonal array of the core complexes seen in the native photosynthetic membrane could be regenerated in the reconstituted membranes by temperature cycling. In the presence of added LH2 complexes, this trigonal symmetry was replaced with orthorhombic symmetry. The small lattice lengths for the latter suggest that the constituent unit of the orthorhombic lattice is the LH2. Fluorescence and fluorescence-excitation spectroscopy was applied to the set of the reconstituted membranes prepared with various proportions of LH2 to core complexes. Remarkably, even though the LH2 complexes contain bacteriochlorophyll a, and the core complexes contain bacteriochlorophyll b, it was possible to demonstrate energy transfer from LH2 to the core complexes. These experiments provide a first step along the path toward investigating how changing the architecture of purple bacterial photosynthetic units affects the overall efficiency of light-harvesting.

  12. Potential and Benefits of Building Information Modeling (BIM During Pre-Construction, Construction and Post Construction Stage

    Directory of Open Access Journals (Sweden)

    Aw Nien Wei

    2017-11-01

    Full Text Available The construction industry is the main economic support for all countries around the world in which continually adapting to meet competitive challenges around the global market. Nevertheless, the construction project is becoming much more complex and difficult to manage. This is because the construction project involves a large number of stakeholder, for example, the consultant companies, architects, engineers, building surveyors and quantity surveyors. The technology currently used in the construction industry is the AutoCAD (Automatic computeraided design. AutoCAD is a commercial software application for 2D and 3D computer-aided design (CAD and drafting develop by Autodesk. Generally, all the drawing design from Autocad will be exchanged among the stakeholder in the form of paper. Information exchanged among them mostly involves a lot of documents and drawings. This practice creates errors because of documents and drawings are mostly in a paper-based format that is not properly managed which results in miscommunication among them. Having wrong information in the construction process could hinder the productivity of projects because in a construction project information is one of the important construction materials. Building Information Modeling (BIM is one of the newly software in the architecture, engineering, and construction (AEC industries to ensure all parties receive the right information. BIM technology is also an intelligent model of a building constructed digitally in the way of 3D. The software will generate model containing the information needed to support the construction, fabrication, and procurement activities that needed to realize the building. This paper will discuss on potential and benefits of BIM during pre-construction stage, construction stage and during post construction stage

  13. Final Environmental Statement related to the operation of Perry Nuclear Power Plant, Units 1 and 2 Docket Nos. 50-440 and 50-441, Cleveland Electric Illuminating Company

    International Nuclear Information System (INIS)

    1982-08-01

    The information in this Final Environmental Statement is the second assessment of the environmental impact associated with the construction and operation of the Perry Nuclear Power Plant, Units 1 and 2, located on Lake Erie in Lake County, about 11 km (7 mi) northeast of Painesville, Ohio. The first assessment was the Final Environmental Statement related to the construction of the plant issued in April 1974, prior to issuance of the construction permits (CPRR-148 and CPPR-149). Plant construction for Unit 1 is currently about 83% complete, and Unit 2 about 43% complete. Fuel loading for Units 1 and 2 currently estimated by the licensee (Cleveland Electric Illuminating Company) for November 1983, with Unit 2 fuel load scheduled for May 1987. The present assessment is the result of the NRC staff review of the activities associated with the proposed operation of the plant

  14. Planning Tunnel Construction Using Markov Chain Monte Carlo (MCMC

    Directory of Open Access Journals (Sweden)

    Juan P. Vargas

    2015-01-01

    Full Text Available Tunnels, drifts, drives, and other types of underground excavation are very common in mining as well as in the construction of roads, railways, dams, and other civil engineering projects. Planning is essential to the success of tunnel excavation, and construction time is one of the most important factors to be taken into account. This paper proposes a simulation algorithm based on a stochastic numerical method, the Markov chain Monte Carlo method, that can provide the best estimate of the opening excavation times for the classic method of drilling and blasting. Taking account of technical considerations that affect the tunnel excavation cycle, the simulation is developed through a computational algorithm. Using the Markov chain Monte Carlo method, the unit operations involved in the underground excavation cycle are identified and assigned probability distributions that, with random number input, make it possible to simulate the total excavation time. The results obtained with this method are compared with a real case of tunneling excavation. By incorporating variability in the planning, it is possible to determine with greater certainty the ranges over which the execution times of the unit operations fluctuate. In addition, the financial risks associated with planning errors can be reduced and the exploitation of resources maximized.

  15. Prospective gas turbine and combined-cycle units for power engineering (a Review)

    Science.gov (United States)

    Ol'khovskii, G. G.

    2013-02-01

    The modern state of technology for making gas turbines around the world and heat-recovery combined-cycle units constructed on their basis are considered. The progress achieved in this field by Siemens, Mitsubishi, General Electric, and Alstom is analyzed, and the objectives these companies set forth for themselves for the near and more distant future are discussed. The 375-MW gas turbine unit with an efficiency of 40% produced by Siemens, which is presently the largest one, is subjected to a detailed analysis. The main specific features of this turbine are that the gas turbine unit's hot-path components have purely air cooling, due to which the installation has enhanced maneuverability. The single-shaft combined-cycle plant constructed on the basis of this turbine has a capacity of 570 MW and efficiency higher than 60%. Programs adopted by different companies for development of new-generation gas turbine units firing synthesis gas and fitted with low-emission combustion chambers and new cooling systems are considered. Concepts of rotor blades for new gas turbine units with improved thermal barrier coatings and composite blades different parts of which are made of materials selected in accordance with the conditions of their operation are discussed.

  16. Decommissioning strategy of the operating WWER type units in the Ukraine

    International Nuclear Information System (INIS)

    Litvinsky, L.L.; Lobach, Yu.N.; Skripov, A.E.

    2002-01-01

    At present in Ukraine, 13 WWER type units are in operation and two other ones are in the final stage of construction. Decommissioning of these units is expected after the year 2010. General planning of their decommissioning is developed in the framework of the decommissioning strategy of operating WWER type units. The strategy contains the objectives, principles and main tasks of the decommissioning as well as the activities at each phase of decommissioning. It is considered a broad range of factors important for the planning and implementation of decommissioning. (author)

  17. Safety improvement programme of WWER 440/230 units in Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Tomek, J.

    2000-01-01

    A brief overview is given of the power sources in Slovakia which include 6 operational reactor units (4 at Jaslovske Bohunice and 2 at Mochovce) and 2 units under construction (at Mochovce). The efforts undertaken in the past 10 years and aimed at upgrading the nuclear safety of the two older (V-230 Soviet type) units at Bohunice are highlighted. The relevant regulatory decisions are dealt with and the measures already carried out are listed. Also characterized are several IAEA international safety assessment missions and safety-aimed meetings which took place in 1998 and 1999 and are of concern to the older Bohunice units. (A.K.)

  18. Helping students mathematical construction on square and rectangle’s area by using Sarong motive chess

    Science.gov (United States)

    Zuliana, Eka; Setyawan, Fariz; Veloo, Arsaythamby

    2017-12-01

    The aim of this study is developing the learning trajectory to construct students’ understanding of the concept of the area of square and rectangle by using Sarong Motive Chess. This research is a design research which is consists of three stages. The stages are preparing for the experiment, designing experiment, and making a retrospective analysis. The activities started by the activity of using sarong motive chess as the manipulative measurement unit. The Sarong motive chess helps students to understand the concept of area of square and rectangle. In the formal stage of cognitive level, students estimate the area of square and rectangle by determining the square unit at the surface area of sarong through many ways. The result of this study concludes that Sarong motive chess can be used for mathematics learning process. It helps the students to construct the concept of a square and rectangle’s area. This study produces learning trajectory to construct the concept of a square and rectangle’s area by using Sarong motive chess, especially for elementary school students.

  19. Job creation due to nuclear power resurgence in the United States

    International Nuclear Information System (INIS)

    Kenley, C.R.; Klingler, R.D.; Plowman, C.M.; Soto, R.; Turk, R.J.; Baker, R.L.; Close, S.A.; McDonnell, V.L.; Paul, S.W.; Rabideau, L.R.; Rao, S.S.; Reilly, B.P.

    2009-01-01

    The recent revival of global interest in the next generation of nuclear power reactors is causing a re-examination of the role of nuclear power in the United States. This renewed interest has led to questions regarding the capability and capacity of current US industries to support a renewal of nuclear power plant deployment. Key among the many questions currently being asked is what potential exists for the creation of new jobs as a result of developing and operating these new plants? Idaho National Laboratory and Bechtel Power Corporation collaborated to perform a Department of Energy-sponsored study that evaluated the potential for job creation in the United States should these new next generation nuclear power plants be built. The study focused primarily on providing an initial estimate of the numbers of new manufacturing jobs that could be created, including those that could be repatriated from overseas, resulting from the construction of these new reactors. In addition to the growth in the manufacturing sector, the study attempted to estimate the potential increase in construction trades necessary to accomplish the new construction. (author)

  20. Integral design small nuclear power plant UNITHERM

    International Nuclear Information System (INIS)

    Adamovich, L. A.; Grechko, G. I.; Ulasevich, V. K.; Shishkin, V. A.

    1995-01-01

    The need to erect expensive energy transmission lines to these places demands to use independent local energy sources. Therefore, a reasonable alternative to the plants fired fossil fuel, mostly hydrocarbon fuel, may come from the nuclear power plants (NPP) of relatively small capacity which are nonattended, shipped to the site by large-assembled modules and completely withdrawable from the site during decommissioning. Application of NPPs for power and heat supply may prove to be cost-efficient and rather positive from social and ecological point of view. UNITHERM NPP belongs to such energy sources and may be used for heat and power supply. Heat can be provided both as hot water and superheated steam. The consumers are able to specify heat/energy supply ratio. NPP design provides for independent energy supply to the consumers and the possibility to disconnect each of them without disruption of operation of the others. Thermal hydraulic diagram of UNITHERM NPP provides for the use of three interconnected, process circuits. The consumers of thermal energy (turbogenerator unit and boilers of the central heating unit) are arranged in the last circuit

  1. Paluel: the production of James Bay on the Cliffs of the Pays de Caux

    International Nuclear Information System (INIS)

    Fridman, G.

    1983-01-01

    The main characteristics concerning the confinement enclosure, the reactor vessel, the fuel used, the primary pumps, the steam generator and the first 1300 MW turbogenerator are reviewed; some comparisons with the 900 MW reactors are made. The design of the cooling system constitutes one of the original features of the installations. A glimpse of the work site, the largest in the world at the present time, is given. Concurrently, the EDF is preparing the infrastructures for training the operational personnel of the new 1300 MW unit. The Paluel site is one of the first where the procedure called''large site'' has been applied in order to build in good time the equipment making it possible to provide the site workers and their families with living conditions as close as possible to those of the remainder of the population. To conclude the question of the investment is tackled. By the end of 1985, the 5200 MW of Paluel (4 units of 1300 MW) will be generating from 30 to 35 billion kWh, as much as James bay [fr

  2. The potential use of constructed wetlands in a recirculating aquaculture system for shrimp culture

    International Nuclear Information System (INIS)

    Lin, Y.-F.; Jing, S.-R.; Lee, D.-Y.

    2003-01-01

    Constructed wetlands improved water qualities and consequently increased the shrimp growth and survival in a recirculating system. - A pilot-scale constructed wetland unit, consisting of free water surface (FWS) and subsurface flow (SF) constructed wetlands arranged in series, was integrated into an outdoor recirculating aquaculture system (RAS) for culturing Pacific white shrimp (Litopenaeus vannamei). This study evaluated the performance of the wetland unit in treating the recirculating wastewater and examined the effect of improvement in water quality of the culture tank on the growth and survival of shrimp postlarvae. During an 80-day culture period, the wetland unit operated at a mean hydraulic loading rate of 0.3 m/day and effectively reduced the influent concentrations of 5-day biochemical oxygen demand (BOD 5 , 24%), suspended solids (SS, 71%), chlorophyll a (chl-a, 88%), total ammonium (TAN, 57%), nitrite nitrogen (NO 2 -N, 90%) and nitrate nitrogen (NO 3 -N, 68%). Phosphate (PO 4 -P) reduction was the least efficient (5.4%). The concentrations of SS, Chl-a, turbidity and NO 3 -N in the culture tank water in RAS were significantly (P≤0.05) lower than those in a control aquaculture system (CAS) that simulated static pond culture without wetland treatment. However, no significant difference (P≤0.05) in BOD 5 , TAN and NO 2 -N was found between the two systems. At the end of the study, the harvest results showed that shrimp weight and survival rate in the RAS (3.8±1.8 g/shrimp and 90%) significantly (P≤0.01) exceeded those in the CAS (2.3±1.5 g/shrimp and 71%). This study concludes that constructed wetlands can improve the water quality and provide a good culture environment, consequently increasing the shrimp growth and survival without water exchange, in a recirculating system

  3. The potential use of constructed wetlands in a recirculating aquaculture system for shrimp culture

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Y.-F.; Jing, S.-R.; Lee, D.-Y

    2003-05-01

    Constructed wetlands improved water qualities and consequently increased the shrimp growth and survival in a recirculating system. - A pilot-scale constructed wetland unit, consisting of free water surface (FWS) and subsurface flow (SF) constructed wetlands arranged in series, was integrated into an outdoor recirculating aquaculture system (RAS) for culturing Pacific white shrimp (Litopenaeus vannamei). This study evaluated the performance of the wetland unit in treating the recirculating wastewater and examined the effect of improvement in water quality of the culture tank on the growth and survival of shrimp postlarvae. During an 80-day culture period, the wetland unit operated at a mean hydraulic loading rate of 0.3 m/day and effectively reduced the influent concentrations of 5-day biochemical oxygen demand (BOD{sub 5}, 24%), suspended solids (SS, 71%), chlorophyll a (chl-a, 88%), total ammonium (TAN, 57%), nitrite nitrogen (NO{sub 2}-N, 90%) and nitrate nitrogen (NO{sub 3}-N, 68%). Phosphate (PO{sub 4}-P) reduction was the least efficient (5.4%). The concentrations of SS, Chl-a, turbidity and NO{sub 3}-N in the culture tank water in RAS were significantly (P{<=}0.05) lower than those in a control aquaculture system (CAS) that simulated static pond culture without wetland treatment. However, no significant difference (P{<=}0.05) in BOD{sub 5}, TAN and NO{sub 2}-N was found between the two systems. At the end of the study, the harvest results showed that shrimp weight and survival rate in the RAS (3.8{+-}1.8 g/shrimp and 90%) significantly (P{<=}0.01) exceeded those in the CAS (2.3{+-}1.5 g/shrimp and 71%). This study concludes that constructed wetlands can improve the water quality and provide a good culture environment, consequently increasing the shrimp growth and survival without water exchange, in a recirculating system.

  4. The unit field sanitation team: a square peg in a round hole.

    Science.gov (United States)

    Bosetti, Timothy; Bridges, Davin

    2009-01-01

    Basic field sanitation and hygiene is a lost art in today's modern Army. Today, more than ever, there is a need for the unit field sanitation team (FST) to serve as advisors to unit commanders in the area of basic field sanitation and hygiene. Soldiers should know how to construct field latrines, construct waste disposal devices, conduct pest management and control activities, disinfect field water supplies, and practice personal hygiene under field conditions. The current unit FST concept is centered on company-sized formations operating in open terrain. This concept does not support current operations, transformed formations, rapidly changing doctrine, and the expeditionary nature of the Army. This article does not present a new concept, but rather a new look at an existing concept and practice based upon the lessons-learned and after-action reports from the Global War on Terrorism to support the Army in transformation during an era of persistent conflict.

  5. Analysis and treatment of diametral tolerance of exciter shaft of the 650 MW nuclear power plant

    International Nuclear Information System (INIS)

    Liu Qiang

    2010-01-01

    The generator and exciter has three support connection in Qinshan II, i.e. there are two bearings for the generator rotor and one for the exciter. This structure results in difficulty to meet the standard when checking the exciter bearing's diametral tolerance. In the fifth outage of unit 2 turbo-generator in Qinshan II, the diametral tolerance failed to meet the standard. There were several reasons, such as the alignment of generator and exciter coupling, the angular moment of generator and exciter coupling bolt, the end surface condition of generator and exciter coupling, the fitting dimension of the coupling bolt hole and the sleeve in it. After analysis and screening of all factors, it was confirmed that the radical reason was the abnormal condition of the generator coupling end surface, and the problem was solved by machining the end surface. (author)

  6. Quantum Riemann surfaces. Pt. 1. The unit disc

    Energy Technology Data Exchange (ETDEWEB)

    Klimek, S.; Lesniewski, A. (Harvard Univ., Cambridge, MA (United States))

    1992-05-01

    We construct a non-commutative C{sup *}-algebra C{sub {mu}}(anti U) which is a quantum deformation of the algebra of continuous functions on the closed unit disc anti U.C{sub {mu}}(anti U) is generated by the Toeplitz operators on a suitable Hilbert space of holomorphic functions on U. (orig.).

  7. 40 CFR 60.1370 - What records must I keep for municipal waste combustion units that use activated carbon?

    Science.gov (United States)

    2010-07-01

    ... waste combustion unit at your plant. Include supporting calculations. (b) Records of low carbon feed... waste combustion units that use activated carbon? 60.1370 Section 60.1370 Protection of Environment... SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is...

  8. The Mexican Health Paradox: Expanding the Explanatory Power of the Acculturation Construct

    Science.gov (United States)

    Horevitz, Elizabeth; Organista, Kurt C.

    2013-01-01

    The Mexican health paradox refers to initially favorable health and mental health outcomes among recent Mexican immigrants to the United States. The subsequent rapid decline in Mexican health outcomes has been attributed to the process of acculturation to U.S. culture. However, the construct of acculturation has come under significant criticism…

  9. Political initiative needed in the United States

    International Nuclear Information System (INIS)

    Hollister, K.

    1979-01-01

    The financing of nuclear power stations in the United States is in trouble mainly because of the long lead times caused by licensing. It will again become feasible when legislation reduces the construction time to eight years or less. The overriding need to protect the dollar by reducing oil imports, will lead the US Government to embrace nuclear power openly. (U.K.)

  10. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  11. Research on the construction of knowledge base for institutes

    International Nuclear Information System (INIS)

    Yang Ru

    2014-01-01

    Knowledge base (KB in short) is very important for institutes. It can train employees to improve their ability of work. It can supply more information to directors for making right decisions, and can help constructing learning organization to promote innovation. Institutes possess several information systems, but there are some problems such as inadequate use of documents, and connotative knowledge isn't described and communicated. KB of institute is based on programs. It stress integrity, secrecy of programs and authorized access. Libraries have abilities to construct KB, since it's the center of information for the institute. KB of institute includes: KB of training, communion of technique issues, KB of department, personal KB, KB of specialists. Because of low cost many institutes adopt softwares of free codes such as: DSpace, EPrints, Fedodra, CDSware, Greenstone. KB systems are choosed by institutes, depending on types of knowledge, ability of technique, fund and so on. KB is constructed by collecting, sorting, describing key knowledge, connecting, accessing, updating and innovating. Program KB of different places and majors will unite in the future. (author)

  12. Safety-Evaluation Report related to the construction of the Clinch River Breeder Reactor Plant. Docket No. 50-537

    International Nuclear Information System (INIS)

    1983-03-01

    The Safety-Evaluation Report for the application by the United States Department of Energy, Tennessee Valley Authority, and the Project Management Corporation, as applicants and owners, for a license to construct the Clinch River Breeder Reactor Plant (docket No. 50-537) has been prepared by the Office of Nuclear Reactor Regulation of the United States Nuclear Regulatory Commission. The facility will be located on the Clinch River approximately 12 miles southwest of downtown Oak Ridge and 25 miles west of Knoxville, Tennessee. Subject to resolution of the items discussed in this report, the staff concludes that the construction permit requested by the applicants should be issued

  13. Dixie Valley Bottoming Binary Unit

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, Dale [Terra-Gen Sierra Holdings, LLC, Reno, NV (United States)

    2014-12-21

    This binary plant is the first air cooled, high-output refrigeration based waste heat recovery cycle in the industry. Its working fluid is environmentally friendly and as such, the permits that would be required with a hydrocarbon based cycle are not necessary. The unit is largely modularized, meaning that the unit’s individual skids were assembled in another location and were shipped via truck to the plant site. The Air Cooled Condensers (ACC), equipment piping, and Balance of Plant (BOP) piping were constructed at site. This project further demonstrates the technical feasibility of using low temperature brine for geothermal power utilization. The development of the unit led to the realization of low temperature, high output, and environmentally friendly heat recovery systems through domestic research and engineering. The project generates additional renewable energy, resulting in cleaner air and reduced carbon dioxide emissions. Royalty and tax payments to governmental agencies will increase, resulting in reduced financial pressure on local entities. The major components of the unit were sourced from American companies, resulting in increased economic activity throughout the country.

  14. 2006 : Wood Products Used in New Residential Construction U.S. and Canada, with Comparisons to 1995, 1998 and 2003 : Executive Summary

    Science.gov (United States)

    Craig Adair; David B. McKeever

    2009-01-01

    The construction of new single family, multifamily, and manufactured housing is an important market for wood products in both the United States and Canada. Annual wood products consumption is dependent on many factors, including the number of new units started, the size of units started, architectural characteristics, and consumer preferences. In 2006, about 39 percent...

  15. Effect of Pre-Construction on Construction Schedule and Client Loyalty

    OpenAIRE

    Jong Hoon Kim; Hyun-Soo Lee; Moonseo Park; Min Jeong; Inbeom Lee

    2016-01-01

    Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client sat...

  16. Reversible arithmetic logic unit for quantum arithmetic

    DEFF Research Database (Denmark)

    Thomsen, Michael Kirkedal; Glück, Robert; Axelsen, Holger Bock

    2010-01-01

    This communication presents the complete design of a reversible arithmetic logic unit (ALU) that can be part of a programmable reversible computing device such as a quantum computer. The presented ALU is garbage free and uses reversible updates to combine the standard reversible arithmetic...... and logical operations in one unit. Combined with a suitable control unit, the ALU permits the construction of an r-Turing complete computing device. The garbage-free ALU developed in this communication requires only 6n elementary reversible gates for five basic arithmetic-logical operations on two n......-bit operands and does not use ancillae. This remarkable low resource consumption was achieved by generalizing the V-shape design first introduced for quantum ripple-carry adders and nesting multiple V-shapes in a novel integrated design. This communication shows that the realization of an efficient reversible...

  17. Modeling system for the rapid construction in Syria

    Directory of Open Access Journals (Sweden)

    Ahmed, Sonia

    2016-06-01

    Full Text Available Prefabrication is a manufacturing process conducted at a specialized facility, in which various materials are joined to form a component part of the final installation. Prefabrication techniques have been progressively adopted in the construction industry in various countries. The demand was at its peak in the early 1970s in Eastern and Western Europe for the construction of new towns. Worldwide, the highest precast levels in 1996 were located in Denmark (43%, the Netherlands (40%, Sweden and Germany (31%. In Asia, the precast levels in Japan and Singapore were about 15% and 8%, respectively, recently, the use of prefabrication is further encouraged to increase productivity and build ability. In Syria too, the first residential project in Damascus: the establishment of 2400 housing units in the year (77-80. Except that the rate of construction pre-cast in Syria is still not exceed 2% of Building of reinforced concrete. In order to participate in the reconstruction of Syria, after the destruction and devastation caused by the war over four years, this search evaluates successful international experiences in rapid construction technique, and modeled system that could serve the current Syrian reality. Introduction of this technology as a new method in the world of construction in Syria requires a good base, relying on the availability of the necessary raw materials and nearness of work site, as well as the need to replace old technology into modern technology, and analyzing the economic, social, environmental criteria, to make the decision about the best solution. Cost and time will form the most important indicators that will be analyzed and calculated, before the final model mode, in order to be able to use this system later in Syrian construction companies.

  18. Self-Contained Portable Data Acquisition/Control System Unit for Hydrogen Environments

    Data.gov (United States)

    National Aeronautics and Space Administration — The platform is designed to be a self-contained unit that is built to support a wide variety of electrical equipment, and constructed so that it can be safely...

  19. Design aspects of 50 m3/d prototype mobile desalination unit

    International Nuclear Information System (INIS)

    Bhattacharyya, K.P.; Srivastava, V.K.; Tewari, P.K.

    2004-01-01

    Supply of fresh water on sustainable basis to all inhabitants is the national responsibility. As a part of national programme to improve quality of life in our society, Desalination Division, BARC has undertaken a project on construction of barge mounted mobile desalination unit of capacity 50 m 3 /d under the domain of health care. The plant is capable of producing safe drinking water at any site and condition where potable water is limited from water sources as lakes and dams, spring, river, bores, estuaries, and open sea. The unit is also capable of purifying nuclear, biological and chemical contaminated water source namely arsenic, fluoride and nitrate. However, the main objective of this prototype mobile unit is to derive potable water from sea water. The barge mounted desalination plant could be useful to the people on shore, in areas like Rann of Kutch or coastal areas which had been affected by natural calamities like floods or severe drought; in small islands like Lakshadeep and Andaman and Nicobar. This type of mobile unit could also be useful for constructional purposes of plants located adjoining to the shore. The plant encompasses state of art reverse osmosis (RO) technology with membrane based ultrafiltration (UF) pretreatment system along with built-in back wash provision and remineralisation. The system is designed for heavy duty tasks in order to withstand frequent relocation from site to site and in skid patterns for portable transportation via road upon requirement. The conceptual design of the plant is over. The design and constructional aspects of the mobile plant are elaborated in this paper. (author)

  20. Newman Unit 1 advanced solar repowering advanced conceptual design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-04-01

    The Newman Unit 1 solar repowering design is a water/steam central receiver concept supplying superheated steam. The work reported is to develop a refined baseline conceptual design that has potential for construction and operation by 1986, makes use of existing solar thermal technology, and provides the best economics for this application. Trade studies performed in the design effort are described, both for the conceptual design of the overall system and for the subsystem conceptual design. System-level functional requirements, design, operation, performance, cost, safety, environmental, institutional, and regulatory considerations are described. Subsystems described include the collector, receiver, fossil energy, electrical power generating, and master control subsystems, site and site facilities. The conceptual design, cost, and performance of each subsystem is discussed at length. A detailed economic analysis of the repowered unit is made to realistically assess the economics of the first repowered unit using present cost data for a limited production level for solar hardware. Finally, a development plan is given, including the design, procurement, construction, checkout, startup, performance validation, and commercial operation. (LEW)