WorldWideScience

Sample records for turbogenerator construction units

  1. SMALL TURBOGENERATOR TECHNOLOGY FOR DISTRIBUTED GENERATION

    Energy Technology Data Exchange (ETDEWEB)

    Ali, Sy; Moritz, Bob

    2001-09-01

    This report is produced in under Contract DE-FC26-00NT40914, awarded in accordance with U.S. Department of Energy solicitation DE-PS26-00FT40759, ''Development of Technologies and Capabilities for Fossil Energy-Wide Coal, Natural Gas and Oil R&D Programs'', area of interest 7, ''Advanced Turbines and Engines.'' As a result of ten years of collaborative fuel cell systems studies with U.S. fuel cell manufacturers, initiated to evaluate the gas turbine opportunities likely to result from this technology, Rolls-Royce in Indianapolis has established a clear need for the creation of a turbogenerator to a specification that cannot be met by available units. Many of the required qualities are approached, but not fully met, by microturbines, which tend to be too small and low in pressure ratio. Market evaluation suggests a 1 MW fuel cell hybrid, incorporating a turbogenerator of about 250 kW, is a good market entry product (large enough to spread the costs of a relatively complex plant, but small enough to be acceptable to early adopters). The fuel cell stack occupies the position of a combustor in the turbogenerator, but delivers relatively low turbine entry temperature (1600 F [870 C]). If fitted with a conventional combustor and run stand-alone at full uncooled turbine temperature (1800 F [980 C]), the turbogenerator will develop more power. The power can be further enhanced if the turbogenerator is designed to have flow margin in its fuel cell role (by running faster). This margin can be realized by running at full speed and it is found that power can be increased to the 0.7 to 1.0 MW range, depending on initial fuel cell stack flow demand. The fuel cell hybrid applications require increased pressure ratio (at least 6 rather than the 3-4 of microturbines) and very long life for a small machine. The outcome is a turbogenerator that is very attractive for stand-alone operation and has been the subject of unsolicited enthusiasm from

  2. Modelling of the turbo-generator groups dynamical behaviour. Application to the ARABELLE turbine of the N4 1400 MW unit

    International Nuclear Information System (INIS)

    Bediou, J.

    1993-01-01

    Simulation of the dynamical behaviour of the EDF turbogenerator groups is based on developments concerning bearing behaviour and shaft line dynamics. A provisional model for the ARABELLE turbine dynamic behaviour is derived. The detailed representation of all the components allows for a fine analysis of the different effects and the evaluation of the stresses transmitted to the structure in anomalistic operating conditions

  3. An expert system for turbogenerator diagnostics

    International Nuclear Information System (INIS)

    Bessenyei, Z.; Tomcsanyi, T.; Toth, Z.; Laczay, I.

    1992-01-01

    In 1990, an expert system for turbo-generator diagnostics (EST-D) was installed at the 3rd and 4th units of the Paks NPP (Hungary). The expert system is strongly integrated to the ARGUS II vibration monitoring and diagnostics system. The system works on IBM PC AT. The VEIKI's and the NPP's human experts were interviewed to fill up the knowledgebase. The system is able to identify 13 different faults of the parts of a turbogenerator. The knowledgebase consists of ca 200 rules. The rules were built in and the system was verified and validated using a model of the turbines and using the experiences gathered with ARGUS II during the last 3 years. The maintenance personnel is authorized to modify and/or extend the knowledgebase. The input data for evaluation come from measured vibration patterns produced by the ARGUS II system, database of events, and maintenance data input by the maintenance personnel. The expert system is based on the modified GENESYS 2.1 shell (developed by SZAMALK, Hungary). Some limitations from PC application were eliminated, and a new, independent explanation module and man-machine interface were developed. Using this man-machine interface, one of the basic goals of the expert system developments was achieved: the human experts contribution is not necessary for diagnoses. The operator of the diagnostics system is able to produce the reports of diagnoses. Of course the interface allows the human experts to see the diagnoses through. It should be mentioned, at the beginning of 1991, we installed a similar expert system at the 1st 1000 MW WWER type unit of the Kalinin NPP (Soviet Union). In this paper, the operation of the EST-D, the man-machine interface and the operational experiences of the first 4 months work are explained. 2 refs., 14 figs

  4. Methods to prevent turbogenerators design elements defects

    Directory of Open Access Journals (Sweden)

    Валентина Володимирівна Шевченко

    2016-11-01

    Full Text Available The paper shows that the determination of a failure probability due to the design, technological and operational drawbacks, as well as due to the turbogenerators working time exceeding from statistics data is inaccurate. Machine park of turbogenerators being rather limited in number, the classification and the distribution of generators into groups is random. It can not be used in practice to identify the pre-emergency state of turbogenerators and their timely stop. Analysis and classification of most frequent defects of turbogenerators has been performed. Methods for assessing such defects and reduction of their development have been offered. The article notes that expenses should be taken into account when setting up a monitoring system to assess the state and to identify defects. Reduction of expenditures on both operating and new turbogenerators must be justified. Rapid return of investments must be ensured. The list of additional tests has been proposed: measurement of infrared radiation outside the body of the turbogenerator for the estimation of the thermal field distribution and the defects of gas coolers identification; vibroacoustic inspection of the stator core and casing to find out the defects in the suspension of the core in the stator casing; analysis of the impurities in the cooling gas and in the dry remains of the drainage products to detect the products of the steel core and the winding insulation wear; value measurement and establishment of the partial discharges formation position; research of vibrations to reveal the cracks in the shaft, circuiting in the rotor windings and defects in the bearings. The paper notes that at upgrading as power grows overall and mounting dimensions must be preserved so that the existing foundation could be used as well as the existing security systems. Therefore, when designing or upgrading turbogenerators with an increase in power it is necessary to introduce new design decisions

  5. A neural network regulator for turbogenerators.

    Science.gov (United States)

    Wu, Q H; Hogg, B W; Irwin, G W

    1992-01-01

    A neural network (NN) based regulator for nonlinear, multivariable turbogenerator control is presented. A hierarchical architecture of an NN is proposed for regulator design, consisting of two subnetworks which are used for input-output (I-O) mapping and control, respectively, based on the back-propagation (BP) algorithm. The regulator has the flexibility for accepting more sensory information to cater to multi-input, multioutput systems. Its operation does not require a reference model or inverse system model and it can produce more acceptable control signals than are obtained by using sign of plant errors during training I-O mapping of turbogenerator systems using NNs has been investigated and the regulator has been implemented on a complex turbogenerator system model. Simulation results show satisfactory control performance and illustrate the potential of the NN regulator in comparison with an existing adaptive controller.

  6. Turbo-generator foundations for thermal and nuclear power plants

    International Nuclear Information System (INIS)

    Gomi, Masanori

    1981-01-01

    The foundations of rotary machines are classified into rigid foundations and elastic foundations from the viewpoint of vibration technology, or into high harmonic order and low harmonic order foundations. As the foundations for turbogenerators, those of high harmonic order type, made of reinforced concrete, have been constructed in USA and Japan. While in Europe, low harmonic order type has been used, and there are many steel frame foundations besides those of reinforced concrete. In Japan, by the import of the know-how from Kraftwerk Union AG in 1963, the low harmonic order type foundations of reinforced concrete have been constructed. The external forms of the foundations of both types are compared, and the meaning of the names of foundations regarding the vibration characteristics is explained. The actual natural frequency of upper foundations, the actual vibration of total system due to machine vibration, and the strength to endure vibration are discussed. The Kraftwerk Union AG has developed and put in practical use the foundations made of reinforced concrete and equipped with steel springs as the standard structure for large turbogenerators for nuclear power generation. With this structure, the degree of harmonic order can be selected effectively low. The precast construction method for foundations using steel box type joints is introduced. (Kako, I.)

  7. BEARING ANALYSIS FOR THE SPUR TURBOGENERATOR.

    Science.gov (United States)

    The results of the analysis of journal bearing configuration for the SPUR turbogenerator are presented in this report. For this analysis, a computer...laminar analysis agreed with existing solutions, thereby providing a check of the computer program. Several journal bearing mounting arrangements were considered, and a design was selected for initial testing. (Author)

  8. BEARING TESTS FOR THE SPUR TURBOGENERATOR.

    Science.gov (United States)

    The results of the liquid-potassium journalbearing test program for the SPUR turbogenerator are presented. The activities described include the design, assembly and checkout of the bearing test rig, and the results of a successfully completed 250-h endurance test on a hydrodynamic journal bearing using 600 F liquid potassium as the lubricant. Unidirectional loads from 6 to 25 lbs were applied to the bearing operating at a speed of 24,000 rpm. (Author)

  9. SKODA 1000 MW turbo-generator

    International Nuclear Information System (INIS)

    Strunc, J.

    1992-01-01

    A basic technical outline is given of the 1000 MW turbogenerator developed and manufactured by the SKODA Plzen Electrical Engineering Works for the new Czechoslovak nuclear power plants. The basic parameters of the machine are the following: apparent output 1111 MVA, active power 1000 MW, power factor 0.9, stator voltage 24 kV (±5 %), stator current 26.7 kA, frequency 50 Hz (±2.5 %), speed 3000 rpm, hydrogen pressure (abs.) 600 kPa, relative short-circuit current 0.4, efficiency 98.75 %, insulation F and thermal exploitation B. In order to respect the dimensions of the turbogenerator and the action of dynamic forces upon the active and mechanical part of the machine, a brand new concept was chosen for the strengthening of the stator winding ends. The magnetic circuit of the stator uses low-loss stampings with oriented grain of Czechoslovak make, 0.35 mm thick and insulated by the insulation producer with ceramic insulation. The rotor was imported from France. Also imported are the hollow conductors of the stator and rotor, the insulation of the slotted part of the rotor and the non-magnetic bandages of the rotor winding. The insulation of the stator coils (RELANEX) is of Czechoslovak make. The equipment of the turbogenerator is briefly described including the excitation system and the systems of sealing oil, gas and cooling water of the stator winding. The technology of turbogenerator manufacture and its testing are also described. (Z.S.) 9 figs

  10. Multiple electronic permanent turbogenerator for turbine engines of the 90th. Final report; MED-Turbogeneratoren fuer Stroemungskraftmaschinen der 90er Jahre. Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Reiner, G.

    1997-12-01

    Present state of research and technology: Usually generators are coupled over a reduction gear to high-speed gas turbines. Independent of the load requirements the number of revolutions of the gas turbine must remain constant and rigidly coupled to the frequency. In the partial load range the efficiency of the gas turbine sinks substantially. Reason/objective of the investigation: This project is supposed to prove the feasibility and the functionality of a turbogenerator (TG) in Multiple Electronic Permanent Magnet (MED) construction principle, which is directly coupled to the high-speed drive turbine. Further on the preconditions for the construction of prototypes in the size class 20 kW up to 100 kW as well as 100 kW to 1 MW should be created. Method: Preliminary investigation, dimensioning, calculation and construction of a 40 kW and a 400 kW (MED) turbogenerator. Production and commissioning of one operating model each. Production and/or procurement as well as construction of necessary testing facilities. Experimental proof of the target data. Results: 3 operating models including power electroncis and necessary periphery were manufactured, measured and tested at the test stand. The projected data: rated voltage and rated output power could be proven experimentally. Conclusion/application possibilities: The MED turbogenerator represents a compact construction principle (weight and volume advantages). Direct coupling on the shaft of the drive turbine is possible (high efficiency; reduction gear is void; noise minimisation). In connection with a static inverter a constant frequency independently of the number of revolutions of the drive turbine can be achieved. Althogether, compared with conventional technology, one can expect around 3-5% reduced fuel consumption. The TG can be applied both in stationary electrical power units and plants for decentralised cogeneration as well as mobilely for the electric drive of heavy trucks and buses. (orig.) [Deutsch

  11. Development and tests of large nuclear turbo-generator welded rotors

    International Nuclear Information System (INIS)

    Colombie, H.; Thiery, M.; Rotzinger, R.; Pelissou, C.; Tabacco, C.; Fernagut, V.

    2015-01-01

    Turbo-generators require large forgings for the rotor and it is a worldwide practice to manufacture turbo-generator rotor bodies as single piece forgings. Rotors for nuclear applications (4-pole rotors design, 1500/1800 rpm) require forgings of up to 2.0 m diameter and ultra large ingots with weight more than 500 tons. Nowadays only few forge masters can deliver such forgings in the world. Based on the large welding experience Alstom has gained over decades on steam and gas turbines and Alstom's multi piece shrunk turbo-generator rotors, it was suggested to manufacture 4-pole turbo-generator rotors by welding the shaft from aligned cylindrical forgings. Compared to turbine welded rotors, the shaft of a turbo-generator rotor presents differences linked to dimensions/weight, weld depth and electrical application. The manufacture of a 2 disc model allowed to prove through electrical and mechanical analysis the reliability of the concept as well as the reliability of the manufacturing processes through material tests, micro sections, electrical component tests, weld geometry, welding processes (TIG,SAW,...), weld inspection (Ultrasonic testing, radiographic inspection,...) weld heat treatments and machining. Then a full rotor able to replace a single forging rotor was manufactured in order to validate and prove to potential customers the validity of the welded rotor technology. During the first order from EDF of a welded 900 MW spare rotor, the procedure for the Non Destructive Test on a slotted rotor was developed upon EDF request in order to compare future Non Destructive Testing with the finger print of the new rotor. This complete rotor was delivered to EDF in January 2013. This rotor is in operation in a nuclear unit since November 2013. (authors)

  12. Turbo-generator control with variable valve actuation

    Science.gov (United States)

    Vuk, Carl T [Denver, IA

    2011-02-22

    An internal combustion engine incorporating a turbo-generator and one or more variably activated exhaust valves. The exhaust valves are adapted to variably release exhaust gases from a combustion cylinder during a combustion cycle to an exhaust system. The turbo-generator is adapted to receive exhaust gases from the exhaust system and rotationally harness energy therefrom to produce electrical power. A controller is adapted to command the exhaust valve to variably open in response to a desired output for the turbo-generator.

  13. Diagnostic system based on condition turbogenerator Petri nets

    International Nuclear Information System (INIS)

    Kachur, S.A.; Shakhova, N.V.

    2016-01-01

    A stochastic model of the automated monitoring systems and process control turbine generator based on Petri nets, allowing to detect local changes in the state of the stator windings of turbogenerator, is presented in the paper [ru

  14. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  15. Problems in the design and development of 750 MW turbogenerators

    CERN Document Server

    Anempodistov, V P; Urusov, I D; Fry, D W; Higinbotham, W

    1963-01-01

    Problems in the Design and Development of 750 MW Turbo-Generators covers selected problems mainly related to projected machines in the development of turbo-generators. This book describes the main lines of research at the Electromechanics Institute of the U.S.S.R. Academy of Sciences.This book is divided into six chapters and begins with an overview of the progress in the generation of electricity along with the rapid economic development of the U.S.S.R. The succeeding chapter deals with the use of efficient cooling system of the winding copper to address the problem of electrical machine's un

  16. Altheim geothermal plant. Power generation by means of an ORC turbogenerator; Geothermieanlagen Altheim. Stromerzeugung mittels Organic-Rankine-Cycle Turbogenerator

    Energy Technology Data Exchange (ETDEWEB)

    Pernecker, G. [Marktgemeindeamt Altheim (Austria)

    1997-12-01

    The report describes the project of the Austrian market town of Altheim to generate electricity by means of an ORC turbogenerator using low-temperature thermal water. The project is to improve the technical and economic situation of the existing industrial-scale geothermal project. (orig.) [Deutsch] Der Bericht beschreibt das Vorhaben der Marktgemeinde Altheim in Oberoesterreich, Strom mittels eines Organic-Rankine-Cycle-Turbogenerators unter Verwendung niedrig temperierten Thermalwassers zu produzieren. Ziel bzw. der Zweck des Projektes ist es, die technische und wirtschaftliche Situation der bestehenden Grossthermieanlage zu verbessern. (orig.)

  17. Electromagnetic behaviour of the shield in turbogenerators with superconducting solenoids

    International Nuclear Information System (INIS)

    Del Vecchio, P.; Veca, G.M.; Sacerdoti, G.

    1975-11-01

    The structure of turbogenerators with superconducting solenoids is analyzed and the investigation of electromagnetic behaviour of the rotating shield is presented. The cases considered are: (a) An hypothetical operation with a single phase with nominal current; (b) Steady-state operation in inverse sequence with 10% of the nominal current; (c) A step variation of the magnetic field intensity in the shield

  18. Specifications for Supplementary Classroom Units "Standard Construction" and "Preframed Construction".

    Science.gov (United States)

    Waring, Robert B.; And Others

    The standards that should be applied to the construction of supplementary classroom units are discussed in this report. Areas dealt with are--(1) general mechanical and electrical work, (2) concrete, (3) masonry, (4) miscellaneous steel and iron, (5) metal windows, (6) carpentry at site, (7) millwork, (8) acoustic treatment, (9) thermal…

  19. Integrated modeling of a turbo-generator: analysis, simulation and compensation; Modelado integrado de un turbogenerador: analisis, simulacion y compensacion

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez Rodriguez, Isaura Victoria

    2008-09-15

    Currently, most turbogenerator control systems consist of decentralized control schemes with independent control-loops for the turbine and the generator. These schemes do not take into account the interaction between the power and voltage control loops, which can degrade the turbogenerator response. To improve this situation, and to develop better control schemes, it is necessary to build full-scope mathematical models of the turbine generator set, which are able to emulate the dynamics throughout the operating range, including the interaction effects. In this thesis the mathematical model of a synchronous generator, which includes damping windings and rotor iron magnetic saturation, is developed. The model was modularly programmed using per-unit parameters. This model was coupled to the existing model of a gas turbine to compose the full-scope model of a 32 MVA combustion turbogenerator. The numerical stability of the generator and turbogenerator models demonstrated through steady-state simulation experiments. The dynamic behavior was demonstrated using power and voltage control loops based on digital PID algorithms. Then, the results of previous experiments were used to design a control scheme based on two fuzzy compensators: one for power and another for voltage. The proposed fuzzy scheme significantly reduced the unwanted interaction effects of decentralized conventional control schemes. It was demonstrated the proposed turbogenerator model is valid in a wide operating range and allows designing and evaluating high performance control schemes, which take into account the interaction between the turbine and the generator. Besides, the turbogenerator model is being used at the Electrical Research Institute to integrate a real-time bench test for turbogenerator control systems. [Spanish] Actualmente, la mayoria de los sistemas de control para turbogeneradores contemplan esquemas de control descentralizados con lazos de control independientes para la turbina y el

  20. Measurement of electrical polar symmetry in turbogenerator rotors

    International Nuclear Information System (INIS)

    Ramírez-Niño, J; González Vázquez, A

    2012-01-01

    This paper presents a measurement technique and an analysis of the electrical polar symmetry in turbogenerator rotors using the so-called recurrent pulse comparison with the injection of charge as the excitation source. The polar symmetry should be measured because it provides information that allows electrical insulation failures in the rotor winding to be detected. A simple electrical model for the rotor is introduced, and the technique for comparing the recurrent pulses is analysed in detail. The particular measurement instrumentation and the analysis of the results obtained in the time and frequency domains, including their relation to the rotor failures, are also described. (paper)

  1. 7 CFR 1755.510 - Construction and assembly unit drawings.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Construction and assembly unit drawings. 1755.510..., AND STANDARD CONTRACT FORMS § 1755.510 Construction and assembly unit drawings. (a) The construction and assembly unit drawings in this section shall be used by borrowers to assist the installer in...

  2. Part-Load Performance of aWet Indirectly Fired Gas Turbine Integrated with an Organic Rankine Cycle Turbogenerator

    Directory of Open Access Journals (Sweden)

    Leonardo Pierobon

    2014-12-01

    Full Text Available Over the last years, much attention has been paid to the development of efficient and low-cost power systems for biomass-to-electricity conversion. This paper aims at investigating the design- and part-load performance of an innovative plant based on a wet indirectly fired gas turbine (WIFGT fueled by woodchips and an organic Rankine cycle (ORC turbogenerator. An exergy analysis is performed to identify the sources of inefficiencies, the optimal design variables, and the most suitable working fluid for the organic Rankine process. This step enables to parametrize the part-load model of the plant and to estimate its performance at different power outputs. The novel plant has a nominal power of 250 kW and a thermal efficiency of 43%. The major irreversibilities take place in the burner, recuperator, compressor and in the condenser. Toluene is the optimal working fluid for the organic Rankine engine. The part-load investigation indicates that the plant can operate at high efficiencies over a wide range of power outputs (50%–100%, with a peak thermal efficiency of 45% at around 80% load. While the ORC turbogenerator is responsible for the efficiency drop at low capacities, the off-design performance is governed by the efficiency characteristics of the compressor and turbine serving the gas turbine unit.

  3. Factors Affecting Productivity in the United States Naval Construction Force

    National Research Council Canada - National Science Library

    Morton, Darren

    1997-01-01

    By using a craftsman questionnaire, this thesis identifies and ranks the most important factors impairing Petty Officer productivity and morale in the United States Naval Construction Force (Seabees...

  4. Processor Units Reduce Satellite Construction Costs

    Science.gov (United States)

    2014-01-01

    As part of the effort to build the Fast Affordable Science and Technology Satellite (FASTSAT), Marshall Space Flight Center developed a low-cost telemetry unit which is used to facilitate communication between a satellite and its receiving station. Huntsville, Alabama-based Orbital Telemetry Inc. has licensed the NASA technology and is offering to install the cost-cutting units on commercial satellites.

  5. Formalizing the Process of Constructing Chains of Lexical Units

    Directory of Open Access Journals (Sweden)

    Grigorij Chetverikov

    2015-06-01

    Full Text Available Formalizing the Process of Constructing Chains of Lexical Units The paper investigates mathematical aspects of describing the construction of chains of lexical units on the basis of finite-predicate algebra. Analyzing the construction peculiarities is carried out and application of the method of finding the power of linear logical transformation for removing characteristic words of a dictionary entry is given. Analysis and perspectives of the results of the study are provided.

  6. Construction: first of St. Lucie unit 2 successes

    International Nuclear Information System (INIS)

    Conway, W.F.

    1989-01-01

    The Nuclear Regulatory Commission (NRC) granted a full power operating license for St. Lucie Unit 2 on June 10, 1983, just six years after construction began. The industry average for nuclear power plant construction during this time was approximately ten years. The rate of completion had a positive effect on the cost of the facility. The price of the unit was $1.42 billion as compared to the $2 billion to $5 billion range experienced by other utilities for nuclear plants. These accomplishments were not serendipitous but the results of management techniques and personnel attitudes involved in the construction of the unit. More importantly, many of these same techniques and attitudes have now become part of a quality improvement program at St Lucie and are reflected in its performance indicators. This paper analyzes the construction success of St Lucie Unit 2 and demonstrates that excellent performance in the construction phase can be carried over to the operation of a facility

  7. Cost Indexing and Unit Price Adjustments for Construction Materials

    Science.gov (United States)

    2012-10-30

    This project was focused on the assimilation of information regarding unit price adjustment clauses, or PACs, : that are offered for construction materials at the state Departments of Transportation (DOTs). It is intended to : provide the South Carol...

  8. Mathematical modeling of a fast-breeder-reactor generating unit

    International Nuclear Information System (INIS)

    Kim, V.E.; Golovach, E.A.; Senkin, V.I.

    1984-01-01

    Dynamics equations are given for a reactor, intermediate heat exchanger, steam generator, and turbogenerator. The dynamic characteristics of the generating unit are described when perturbations occur in grid frequency, turbine valves, and feedwater consumption

  9. 3D-modeling for determination of axial forces acting in elements of the end zone of power turbogenerators

    Directory of Open Access Journals (Sweden)

    Y.A.Haydenko

    2013-12-01

    Full Text Available A field mathematical model of the end zone of a powerful generator type TVV-1000-2U3 in the 3D-setting is developed. Modelling of the nominal mode of turbogenerator operation is done. The distribution of the electromagnetic field, eddy currents, and the Ampere force appearing in such elements of the end zone of turbogenerator as the pressure plate, push pins and electrically conductive screen.

  10. Genesee generating station, unit 1: Construction and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Trowsdale, D.R.

    1995-12-31

    The Genesee Power Plant is located about 80 kilometers southwest of Edmonton, in an area with vast coal reserves. Completion of the plant`s 410-megawatt Unit 1 in 1994 concluded the last phase of a development originally approved for construction and commercial operation in 1980. This paper reviews the history of the plant, its site plan and general design features, and presents a case study of the construction and commissioning of Unit 1. The case study describes work schedule management, construction coordination, quality control and quality assurance procedures, site cost control, safety management, labor relations, commissioning management, scheduling and staffing, work planning and coordination, and problems encountered during construction and commissioning, as well as actions taken to solve those problems.

  11. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  12. Implementation of adaptive critic-based neurocontrollers for turbogenerators in a multimachine power system.

    Science.gov (United States)

    Venayagamoorthy, G K; Harley, R G; Wunsch, D C

    2003-01-01

    This paper presents the design and practical hardware implementation of optimal neurocontrollers that replace the conventional automatic voltage regulator (AVR) and the turbine governor of turbogenerators on multimachine power systems. The neurocontroller design uses a powerful technique of the adaptive critic design (ACD) family called dual heuristic programming (DHP). The DHP neurocontrollers' training and testing are implemented on the Innovative Integration M67 card consisting of the TMS320C6701 processor. The measured results show that the DHP neurocontrollers are robust and their performance does not degrade unlike the conventional controllers even when a power system stabilizer (PSS) is included, for changes in system operating conditions and configurations. This paper also shows that it is possible to design and implement optimal neurocontrollers for multiple turbogenerators in real time, without having to do continually online training of the neural networks, thus avoiding risks of instability.

  13. Torsional vibration analysis in turbo-generator shaft due to mal-synchronization fault

    Science.gov (United States)

    Bangunde, Abhishek; Kumar, Tarun; Kumar, Rajeev; Jain, S. C.

    2018-03-01

    A rotor of turbo-generator shafting is many times subjected to torsional vibrations during its lifespan. The reasons behind these vibrations are three-Phase fault, two-phase fault, line to ground fault, faulty-mal synchronization etc. Sometimes these vibrations can cause complete failure of turbo-generator shafting system. To calculate moment variation during these faults on the shafting system vibration analysis is done using Finite Elements Methods to calculate mass and stiffness matrix. The electrical disturbance caused during Mal-synchronization is put on generator section, and corresponding second order equations are solved by using “Duhamel Integral”. From the moment variation plots at four sections critically loaded sections are identified.

  14. Validation of DIVA: an expert system for the diagnostic of turbo-generator vibrations

    International Nuclear Information System (INIS)

    Chevalier, R.; Ricard, B.; Tiarri, J.P.; Bonnet, J.C.

    1990-01-01

    The project presented in this paper concerns the development of an expert system dealing with the diagnosis of turbo-generator vibrations. DIVA - Diagnosis of Shaft Line Vibrations - is a joint project which is carried out by ALSTHOM, Electricite de France and Laboratoire de Marcoussis, research centre of CGE. This article first presents the organisation of the system and then the goals and results of the tests already achieved [fr

  15. Determination of Permissible Short-Time Emergency Overloading of Turbo-Generators and Synchronous Compensators

    Directory of Open Access Journals (Sweden)

    V. A. Anischenko

    2011-01-01

    Full Text Available The paper shows that failure to take into account variable ratio of short-time emergency overloading of turbo-generators (synchronous compensators that can lead to underestimation of overloading capacity or impermissible insulation over-heating.A method has been developed for determination of permissible duration of short-time emergency over-loading that takes into account changes of over-loading ratio in case of a failure.

  16. Study of electromagnetic phenomena in the end region of large turbo-generators - Testing tools for the 125 MW turbo-generator

    International Nuclear Information System (INIS)

    Vogt, Gilles

    2013-01-01

    This work aims to improve the knowledge of electromagnetic phenomena that occur in the end region of large turbo-generators. The goal of this work is to evaluate the axial magnetic flux density with regard to the operating conditions (such as active or reactive power) in order to prevent potential deterioration of the stator. Indeed, the axial magnetic field is known to induce hot points or voltages between laminations that may cause insulation breakdown and thus stator faults. An experimental apparatus in real scale has been designed and built. Its purpose is to study precisely the following phenomena: losses, axial magnetic flux density penetration, voltage across adjacent voltages. Finite element simulations (FEM) are also used: their advantages and drawbacks are discussed, and the results are compared with the experimental measures. The whole end-region of a turbo-generator is also simulated. Finally, a simple model of the axial magnetic flux is proposed. Its parameters are based on the results of the FEM model, but it may be used in real time to evaluate the axial magnetic flux density of any operating point. (author)

  17. Genesee generating station Unit 1. Construction and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Trowsdale, D.R.; Keller, A. [Edmonton Power, Edmonton, AB (Canada)

    1995-12-31

    The history of the Genesee Power Project was recapped, providing details of its site plan and design features and a case study of the construction and commissioning of Genesee Unit 1. General principles and specific steps taken to ensure the successful completion of the work were presented. General construction management information and more specific information on scheduling, coordination, quality control and quality assurance measures, site cost control, safety, and labour relations were described. Construction and management problems of all types were recounted, including some significant equipment failures during commissioning. In the end,the construction and commissioning of the Genesee Project was successful, being completed ahead of schedule and under budget. The success of the project was attributed to the best use of available skills and resources, and a capable managerial, engineering and technical staff.

  18. Analysis of the accuracy of methods for the determination of the synchronous reactances and the characteristics of turbogenerator

    Directory of Open Access Journals (Sweden)

    Kostić Miloje M.

    2017-01-01

    Full Text Available The values of saturated synchronous reactances turbogenerator for d-axis and q axis are different, Xd,sat > Xq,sat and when their unsaturated equal value, Xd,u = Xq,u. The exact calculation these reactances is quite complex and is conducted only using the finite element method (FEM with experimental validation. In order to adapt to practical needs, the most important results are elaborated in the form of family magnetizing curves loaded machines for d and q axis. This enables more accurate calculation of saturated synchronous reactance, and on the basis of the excited current and the power angle, and accurate design of the capability diagram for overexcited regimes and underexcited regimes. Such a method of constructing the two families of curves is complex for practical application, however, uses a simpler procedure. The calculation results with the above simplifications are analyzed in the work so that the calculated values of power are compared with the given (measured values. It turns out that these differences are large, even, in the examples from famous literature, and be critical to use methods that are implemented and in computer programs.

  19. Research into Practice: Spatial Sense and the Construction of Abstract Units in Tiling.

    Science.gov (United States)

    Wheatley, Grayson H., Ed.

    1992-01-01

    Discusses a variation on tiling that offers opportunities for the construction of the fundamental mathematical concept of constructing abstract units called "unitizing." Tiling integrates geometric and numerical settings to develop spatial sense and present mathematics as constructing patterns. (MDH)

  20. Design and Construction of a Remote Controlled Power Supply Unit

    Directory of Open Access Journals (Sweden)

    Mahmud Shehu AHMED

    2007-08-01

    Full Text Available The paper presents the design and construction of an infrared remote controlled power supply-switching unit, which is a device that enables the user to operate or control the mains power supplied from approximately 5 to 10 meters away. The remote transmits a beam of light using an infrared light emitting diode; this light is picked and decoded by the receiver unit (Photodiode. The receiver only activates when it receives the beam of light, there are no accidental activations. The system was broken down into simpler functional parts namely: The transmitter stage, the detector (phototransistor stage, the NAND Schmitt trigger stage, the flip-flop stage and the relay stage. Details of the stages are described in the paper.

  1. Final Report: Self Consolidating Concrete Construction for Modular Units

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, Russell [Georgia Inst. of Technology, Atlanta, GA (United States); Kahn, Lawrence [Georgia Inst. of Technology, Atlanta, GA (United States); Kurtis, Kimberly [Georgia Inst. of Technology, Atlanta, GA (United States); Petrovic, Bojan [Georgia Inst. of Technology, Atlanta, GA (United States); Loreto, Giovanni [Georgia Inst. of Technology, Atlanta, GA (United States); Van Wyk, Jurie [Westinghouse Electric Company, Cranberry Township, PA (United States); Canterero-Leal, Carlos [Westinghouse Electric Company, Cranberry Township, PA (United States)

    2016-07-29

    This report outlines the development of a self-consolidating concrete (also termed “self-compacting concrete” or SCC) so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed and validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The self-roughening concrete produced as part of this research was assessed in SC structures at three scales: small-scale shear-friction specimens, mid-scale beams tested in in-plane and out-of-plane bending, and a full-scale validation test using an SC module produced by Westinghouse as part of the Plant Vogtle expansion. The experiments show that the self-roughening concrete can produce a cold-joint surface of 0.25 inches (6 mm) without external vibration during concrete placement. The experiments and subsequent analysis show that the shear friction provisions of ACI 318-14, Section 22.9 can be used to assess the shear capacity of the cold-joints in SC modular construction, and that friction coefficient of 1.35 is appropriate for use with these provisions.

  2. Final Report: Self-Consolidating Concrete Construction for Modular Units

    International Nuclear Information System (INIS)

    Gentry, Russell; Kahn, Lawrence; Kurtis, Kimberly; Petrovic, Bojan; Loreto, Giovanni; Van Wyk, Jurie; Canterero-Leal, Carlos

    2016-01-01

    This report focuses on work completed on DE-NE0000667, Self-Consolidating Concrete for Modular Units, in connection with the Department of Energy Nuclear Energy Enabling Technologies (DOE-NEET) program. This project was completed in the School of Civil and Environmental Engineering at the Georgia Institute of Technology, with Westinghouse Corporation as the industrial partner. The primary objective of this project was to develop self-consolidating concrete (also termed ''self-compacting concrete'' or SCC) mixtures so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed and validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The SCC mixtures developed were able to carry shearing forces across the cold-joint boundaries. This ''self-roughening'' was achieved by adding a tailored fraction of lightweight aggregate (LWA) to the concrete mix, some of which raised to the surface during curing, forming a rough surface on which subsequent concrete placements were made. The self-roughening behavior was validated through three sets of structural tests. Shear friction on small-scale specimens with cold joints was assessed using varying fractions of LWA and with varying amounts of external steel plate reinforcement. The results show that the shear friction coefficient, to be used with the provisions of ACI 318-14, Section 22.9, can be taken as 1.35. Mid-scale beam tests were completed to assess the cold-joint capacity in both in-plane and out-of-plane bending. The results showed that the self-roughened joints performed as well as monolithic joints. The final assessment was a full-scale test using a steel composite module supplied by

  3. Final Report: Self-Consolidating Concrete Construction for Modular Units

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, Russell [Georgia Inst. of Technology, Atlanta, GA (United States); Kahn, Lawrence [Georgia Inst. of Technology, Atlanta, GA (United States); Kurtis, Kimberly [Georgia Inst. of Technology, Atlanta, GA (United States); Petrovic, Bojan [Georgia Inst. of Technology, Atlanta, GA (United States); Loreto, Giovanni [Georgia Inst. of Technology, Atlanta, GA (United States); Van Wyk, Jurie [Westinghouse Inc., Cranberry Township, PA (United States); Canterero-Leal, Carlos [Westinghouse Inc., Cranberry Township, PA (United States)

    2016-07-29

    This report focuses on work completed on DE-NE0000667, Self-Consolidating Concrete for Modular Units, in connection with the Department of Energy Nuclear Energy Enabling Technologies (DOE-NEET) program. This project was completed in the School of Civil and Environmental Engineering at the Georgia Institute of Technology, with Westinghouse Corporation as the industrial partner. The primary objective of this project was to develop self-consolidating concrete (also termed “self-compacting concrete” or SCC) mixtures so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed and validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The SCC mixtures developed were able to carry shearing forces across the cold-joint boundaries. This “self-roughening” was achieved by adding a tailored fraction of lightweight aggregate (LWA) to the concrete mix, some of which raised to the surface during curing, forming a rough surface on which subsequent concrete placements were made. The self-roughening behavior was validated through three sets of structural tests. Shear friction on small-scale specimens with cold joints was assessed using varying fractions of LWA and with varying amounts of external steel plate reinforcement. The results show that the shear friction coefficient, to be used with the provisions of ACI 318-14, Section 22.9, can be taken as 1.35. Mid-scale beam tests were completed to assess the cold-joint capacity in both in-plane and out-of-plane bending. The results showed that the self-roughened joints performed as well as monolithic joints. The final assessment was a full-scale test using a steel composite module supplied by Westinghouse and similar in construction to

  4. Proton therapy construction projects in the United States

    International Nuclear Information System (INIS)

    Alonso, J.R.

    1992-11-01

    Proton and heavy-ion radiation therapy has been taking place now for 40 years, at many accelerator laboratories around the world, essentially all of these centers built originally for physics research. The high degree of promise shown for using these particles for treating and curing cancer has stimulated the medical community to look seriously at building dedicated accelerator facilities in a hospital setting, where more rapid progress can be made in clinical research, and development of effective treatments with these beams. In the United States, the first such facility, at the Loma Linda University Medical Center, has been in operation now for two years, and is currently treating a total of 35 to 40 patients per day. Two new projects are being designed at present, one at the Massachusetts General Hospital in Boston, Massachusetts, the second a joint project of the Lawrence Berkeley Laboratory and the University of California at Davis Medical Center in Sacramento, California. This paper will discuss accelerator and beam characteristics relevant to the proton-therapy application, and will present performance and operations characteristics for the Loma Linda facility, as well as details of the plans, process and progress towards construction of the new facilities in Boston and Sacramento

  5. Experience and specific features of construction of the Kursk NPP unit-2

    International Nuclear Information System (INIS)

    Saakyan, V.A.; Kirpichnikov, V.I.; Sysoev, V.S.

    1980-01-01

    The experience of constructing the second unit of the first Kursk NPP generation with the RBMK-1000 reactor is described. The construction technology applies new industrial methods such as follows: mounting units assembled in-site from ribbed panels of plant production cast concretes, new design of thermal isolation and openings. The labour costs and duration of the reactor unit construction are analyzed by stages [ru

  6. Part-Load Performance of a Wet Indirectly Fired Gas Turbine Integrated with an Organic Rankine Cycle Turbogenerator

    DEFF Research Database (Denmark)

    Pierobon, Leonardo; Nguyen, Tuong-Van; Mazzucco, Andrea

    2014-01-01

    ) fueled by woodchips and an organic Rankine cycle (ORC) turbogenerator. An exergy analysis is performed to identify the sources of inefficiencies, the optimal design variables, and the most suitable working fluid for the organic Rankine process. This step enables to parametrize the part-load model...... of the plant and to estimate its performance at different power outputs. The novel plant has a nominal power of 250 kW and a thermal efficiency of 43%. The major irreversibilities take place in the burner, recuperator, compressor and in the condenser. Toluene is the optimal working fluid for the organic...... Rankine engine. The part-load investigation indicates that the plant can operate at high efficiencies over a wide range of power outputs (50%–100%), with a peak thermal efficiency of 45% at around 80% load. While the ORC turbogenerator is responsible for the efficiency drop at low capacities, the off...

  7. Preparation phase of Mochovce NPP unit 3 and 4 construction completion

    International Nuclear Information System (INIS)

    Cillik, I.; Tvaroska, V.; Liska, P.; Ziman, V.

    2005-01-01

    In this presentation authors deal with preparation phase of Mochovce NPP unit 3 and 4 construction completion. The preparation phase of the Mochovce unit 3 and 4 construction completion gives following main outputs: (a) Detail Safety Concept gives definitive complex safety and technical improvement of MO34, more precise analysis of the total cost of construction completion, a list of potential suppliers and construction completion time schedule; (b) Appendices of Basic Design Documentation and Preliminary SAR serves as basic documentation for UJD SR decision making according to Law No. 541 for start of Realization Phase; (c) The Preparation Phase represents effective tool for start of MO34 construction completion Realization Phase.

  8. Synthesis on construction unit cost development : technical report.

    Science.gov (United States)

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  9. Impacts of the turbogenerator reactive operation in the nuclear fuel burnup

    International Nuclear Information System (INIS)

    Oliveira, Helio Ricardo V. de; Martinez, Aquilino S.

    2002-01-01

    The parameterization of the losses in a turbogenerator in function of an operation with the electrical system reactive allowed to model in a simple and exact way the equations that define and they quantify the additional of nuclear potency that it should be generated by a reactor, in order to maintain the commitment with the national system operator, that is, the electric active power contracted. starting from this additional of nuclear power it was modeled the additional burn up of the fuel elements, as well as the numbers of effective days to full power wasted. it was promoted a safety analysis and some limitations due to the reactive operation of the electrical system. inside of this context it was made a financial evaluation in which we ask some questions to companies and government organs in order to define what losses are acceptable and also the reason why we don't use other technician resources such as: increase of the electrical mesh, electrical power injection in strategic points, capacitor banks and increase of the number the electrical plants. (author)

  10. The use of interorganisational ICT in United States construction projects

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2010-01-01

    In recent research, the use of ICT applications in real time construction projects have been documented and analysed extensively. However, there is a need for identifying and analysing in-depth the mechanisms influencing the use of interorganisational ICT applications and for solutions to eliminate

  11. KITAE III: Unit Construction for Effect in Battlespace Helmand

    Science.gov (United States)

    2011-06-01

    GIRoA Government of the Islamic Republic of Afghanistan GSM Global System for Mobile Communication HTM Human Terrain Mapping ICOM Integrated...combined with effective short range integrated communications ( ICOM ) based on repeater stations to minimize our ability to triangulate supplemented by...Construct: In order to fully exploit the INS use of ICOM and GSM, the natural ATF language capacity and cultural ability has been married to CF technologies

  12. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... a Combined License) of New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY... a COL intending to construct and operate new nuclear power plants (NPPs) on multi-unit sites to... Impacts of Construction (under a Combined License) of New Nuclear Power Plants on Operating Units at Multi...

  13. The Measurement of Time: Children's Construction of Transitivity, Unit Iteration, and Conservation of Speed.

    Science.gov (United States)

    Long, Kathy; Kamii, Constance

    2001-01-01

    Interviews 120 children in kindergarten and grades 2, 4, and 6 with five Piagetian tasks to determine the grade level at which most have constructed transitive reasoning, unit iteration, and conservation of speed. Indicates that construction of the logic necessary to make sense of the measurement of time is generally not complete before sixth…

  14. Autoclaved aerated concrete : shaping the evolution of residential construction in the United States.

    OpenAIRE

    Bukoski, Steven C.

    1998-01-01

    CIVINS (Civilian Institutions) Thesis document Precast Autoclaved Aerated Concrete (AAC) is a proven construction material used in Europe for over 70 years. Introduced to the United States in 1990, construction thus far is limited to commercial and custom borne applications. Premium benefits include energy efficiency and resistance to natural disaster and pests. Despite being the leading residential construction material in Europe and Japan, lumber is the leading material of choice in the ...

  15. Construction safety research in the United States: targeting the Hispanic workforce

    OpenAIRE

    Brunette, M

    2004-01-01

    While it is known that Hispanics have a continuous growing participation in the construction workforce and that their fatal and non-fatal occupational injuries are higher than any other ethnic group, very little construction safety and health research has been conducted in the United States. Research that focuses on safety and health of Hispanic workers employed in the construction industry might prove beneficial in reducing injuries and promoting safe and decent workplaces for all.

  16. Expanded Organic Building Units for the Construction of Highly Porous Metal-Organic Frameworks

    NARCIS (Netherlands)

    Kong, G.Q.; Han, Z.D.; He, Y.; Qu, S.; Zhou, W.; Yildirim, T.; Krishna, R.; Zou, C.; Chen, B.; Wu, C.D.

    2013-01-01

    wo new organic building units that contain dicarboxylate sites for their self-assembly with paddlewheel [Cu2(CO2)4] units have been successfully developed to construct two isoreticular porous metal-organic frameworks (MOFs), ZJU-35 and ZJU-36, which have the same tbo topologies (Reticular Chemistry

  17. Unit soil loss rate from various construction sites during a storm.

    Science.gov (United States)

    Maniquiz, Marla C; Lee, Soyoung; Lee, Eunju; Kong, Dong-Soo; Kim, Lee-Hyung

    2009-01-01

    The Korean Ministry of Environment (MOE) opts to establish an ordinance having a standard specifying an allowable soil loss rate applicable to construction projects. The predicted amount of soil loss from a construction site exceeding the standard can be used to calculate the percent reduction necessary to comply with the ordinance. This research was conducted to provide a basis to establish a standard by investigating the unit soil loss rates in the three phases of development: pre-construction, active construction and post construction based from 1,036 Environmental Impact Assessment (EIA) reports within the six-year period (2000-2005). Based on the findings, several factors affect the magnitude of soil loss rates particularly storm characteristics, site slope, soil type, location from rivers, as well as the type of construction activity. In general, the unit soil loss rates during the active construction phase are extremely higher in comparison to undisturbed areas; in magnitude of 7 to 80 times larger in urban areas and 18 to 585 times in rural areas. Only between 20 to 40 percent of the soil loss rates was contributed at pre- and post- construction phases indicating that the active construction phase is the most important phase to control.

  18. Wood Products Other Building Materials Used in New Residential Construction in the United States

    Science.gov (United States)

    David B. McKeever; Joe Elling

    2015-01-01

    On average, new residential construction accounts for about one-third of all wood products consumed in the United States annually. During periods of robust housing activity, 45% or more of all wood products consumed are for new single-family and multifamily housing. This can fall to as low as 20% or less during times of economic recession. Unfortunately, 2012 was not...

  19. Wood and Other Materials Used to Construct Nonresidential Buildings in the United States 2011 Executive Summary

    Science.gov (United States)

    David B. McKeever

    2013-01-01

    The construction of low-rise nonresidential buildings is an important market for lumber, engineered wood products, and structural and nonstructural wood panels in the United States. This report examines low-rise nonresidential buildings of six or fewer stories. Those with more than six stories are normally severely restricted by building codes from being wood framed....

  20. Wood and Other Materials Used to Construct Nonresidential Buildings in the United States 2011

    Science.gov (United States)

    Craig Adair; David B. McKeever; Chris Gaston; Margaret. Stewart

    2013-01-01

    The construction of low-rise nonresidential buildings is an important market for lumber, engineered wood products, and structural and nonstructural wood panels in the United States. This report examines low-rise nonresidential buildings of six or fewer stories. Those with more than six stories are normally severely restricted by building codes from being wood framed....

  1. Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem

    2015-02-01

    Full Text Available This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects. Meanwhile, the research has determined the percentage of project items, in such a remote environment. Estimation equations suitable for remote areas have been formulated. Moreover, a procedure for unite price calculation is concluded.

  2. Perspectives of application of synthetic diamonds in polyurethane compositions for development of new high thermal conductivity system of isolation of powerful turbogenerators

    International Nuclear Information System (INIS)

    Kensits'kij, O.G.; Vigovs'kij, O.V.; Khvalyin, D.Yi.

    2017-01-01

    Reviewed and analyzed components of modern high-voltage insulation of electrical machines. The expediency of increasing of heat-conducting properties of the system of isolation of stator winding of powerful turbogenerators is justified. The main ways of improving heat transfer in the insulation system the stator windings of the turbogenerators are presented and analyzed. Perspectives of application of composite material based on polyurethane with additives of synthetic diamonds for development of new high thermal conductivity system of isolation of powerful electrical machines are analyzed. The technology by which was created the prototype of the insulating material with the application of diamond powder in a polyurethane composition is described. Executed laboratory experimental researches of the electrophysical parameters of the sample developed insulating material. That showed the perspective of this direction of perfection of isolation.

  3. Energy and exergy analysis of the turbo-generators and steam turbine for the main feed water pump drive on LNG carrier

    International Nuclear Information System (INIS)

    Mrzljak, Vedran; Poljak, Igor; Mrakovčić, Tomislav

    2017-01-01

    Highlights: • Two low-power steam turbines in the LNG carrier propulsion plant were investigated. • Energy and exergy efficiencies of both steam turbines vary between 46% and 62%. • The ambient temperature has a low impact on exergy efficiency of analyzed turbines. • The maximum efficiencies area of both turbines was investigated. • A method for increasing the turbo-generator efficiencies by 1–3% is presented. - Abstract: Nowadays, marine propulsion systems are mainly based on internal combustion diesel engines. Despite this fact, a number of LNG carriers have steam propulsion plants. In such plants, steam turbines are used not only for ship propulsion, but also for electrical power generation and main feed water pump drive. Marine turbo-generators and steam turbine for the main feed water pump drive were investigated on the analyzed LNG carrier with steam propulsion plant. The measurements of various operating parameters were performed and obtained data were used for energy and exergy analysis. All the measurements and calculations were performed during the ship acceleration. The analysis shows that the energy and exergy efficiencies of both analyzed low-power turbines vary between 46% and 62% what is significantly lower in comparison with the high-power steam turbines. The ambient temperature has a low impact on exergy efficiency of analyzed turbines (change in ambient temperature for 10 °C causes less than 1% change in exergy efficiency). The highest exergy efficiencies were achieved at the lowest observed ambient temperature. Also, the highest efficiencies were achieved at 71.5% of maximum developed turbo-generator power while the highest efficiencies of steam turbine for the main feed water pump drive were achieved at maximum turbine developed power. Replacing the existing steam turbine for the main feed water pump drive with an electric motor would increase the turbo-generator energy and exergy efficiencies for at least 1–3% in all analyzed

  4. Present status of Tomari No.3 unit construction and efforts for preventing global warming

    International Nuclear Information System (INIS)

    Ouchi, Tamotsu

    2008-01-01

    Hokkaido Electric Power Company, Inc. (HEPCO) supplies electricity to almost all area of Hokkaido. Its service area accounts for about one-fifth of Japan's area, on the other hand, the population of the service area only accounts for 4.4% of the nation. This means Hokkaido's nature is precious, and one of HEPCO's missions is to protect such environment, with providing stable electricity. Therefore, nuclear power, which does not emit greenhouse effect gas for generation, is becoming more important. HEPCO's operating nuclear power stations are Tomari No.1 unit and No.2 unit. Their generation capacity is 579 MW respectively. Now, No.3 unit is under construction. Its generation capacity is 912 MW and it will be operational in December 2009. In Hokkaido, about one fourth of electricity is now produced by nuclear power, however, after Tomari No.3 is completed, about 40% of electricity will be produced by nuclear. So, Tomari No.3 unit will contribute stable supply of electricity in the first half of 21st century and prevent global warming in Hokkaido. This paper describes the present status of Tomari No.3 unit construction with major specifications and our efforts to prevent global warming. (author)

  5. THE EVOLUTION OF THE DESIGN AND CONSTRUCTION OF MASONRY BUILDINGS IN THE UNITED STATES

    OpenAIRE

    Richard E. Klingner

    2012-01-01

    In this paper, the process used to develop building codes in the United States of America (USA) is summarized, with emphasis on masonry. Masonry materials used in the USA are discussed. Types of masonry construction in the USA are reviewed, addressing historical as well as modern masonry. Current non-structural and structural applications of masonry in the USA are reviewed. Historical development of masonry codes in the USA is summarized, with emphasis on the current Masonry Standards Joi...

  6. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    International Nuclear Information System (INIS)

    1975-01-01

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  7. 19 CFR 123.18 - Equipment and materials for constructing bridges or tunnels between the United States and Canada...

    Science.gov (United States)

    2010-04-01

    ... bridges or tunnels between the United States and Canada or Mexico. (a) Admission of equipment and materials. Equipment for use in construction of bridges or tunnels between the United States and Canada or... 19 Customs Duties 1 2010-04-01 2010-04-01 false Equipment and materials for constructing bridges...

  8. Construction and startup test experience of Kashiwazaki-Kariwa N.P.S. unit 6

    International Nuclear Information System (INIS)

    Ohtsuki, Yoshiteru; Matsumura, Makoto; Kawahara, Akira.

    1997-01-01

    Kashiwazaki-Kariwa Nuclear Power Station unit 6 and 7 (K-6 and K-7) were awarded Establishment Permit from Japanese authority on May 1991. With this permit, K-6 construction started on September 1991, and K-7 on February 1992. Both units are the first ABWR (Advanced Boiling Water Reactor) in the world with the electrical output 1,356 MW each. ABWR is characterized with Reactor Internal Pump, Fine Motion Control Rod Drive, Reinforced Concrete Containment Vessel. Advanced Control and Instrumentation System, 52'' Last Blade Turbine, and Moisture Separator Heater. Construction completed successfully before the original schedule with innovative technique such as All Weather Construction Method and Large Block Module Construction Method. K-6 completed all Japanese authority's inspection and prototype tests. All tests demonstrated the integrity of the K-6 as a nuclear power plant, and it also indicated that K-6 meets the original ABWR target. K-6 started commercial operation on November 7, 1996. K-7 is under startup test stage and scheduled to start commercial operation in 1997. (author)

  9. Comparative empirical analysis of temporal relationships between construction investment and economic growth in the United States

    Directory of Open Access Journals (Sweden)

    Navid Ahmadi

    2017-09-01

    Full Text Available The majority of policymakers believe that investments in construction infrastructure would boost the economy of the United States (U.S.. They also assume that construction investment in infrastructure has similar impact on the economies of different U.S. states. In contrast, there have been studies showing the negative impact of construction activities on the economy. However, there has not been any research attempt to empirically test the temporal relationships between construction investment and economic growth in the U.S. states, to determine the longitudinal impact of construction investment on the economy of each state. The objective of this study is to investigate whether Construction Value Added (CVA is the leading (or lagging indicator of real Gross Domestic Product (real GDP for every individual state of the U.S. using empirical time series tests. The results of Granger causality tests showed that CVA is a leading indicator of state real GDP in 18 states and the District of Columbia; real GDP is a leading indicator of CVA in 10 states and the District of Columbia. There is a bidirectional relationship between CVA and real GDP in 5 states and the District of Columbia. In 8 states and the District of Columbia, not only do CVA and real GDP have leading/lagging relationships, but they are also cointegrated. These results highlight the important role of the construction industry in these states. The results also show that leading (or lagging lengths vary for different states. The results of the comparative empirical analysis reject the hypothesis that CVA is a leading indicator of real GDP in the states with the highest shares of construction in the real GDP. The findings of this research contribute to the state of knowledge by quantifying the temporal relationships between construction investment and economic growth in the U.S. states. It is expected that the results help policymakers better understand the impact of construction investment

  10. Design and construction of a thermal evaporation unit for laser isotope separation chamber

    International Nuclear Information System (INIS)

    Jazmati, A. K.; Al-Khawwam, A.

    2008-01-01

    A thermal evaporation unit has been ,especially, designed and constructed to fit in the laboratory chamber, which is already constructed for laser isotope separation project. The evaporation unit consists of three parts: an evaporator, a thermal isolation unit and a cooling jacket. The evaporator designed so that it produces the Yb metal vapour through a thin slit. The sheet of the vapour that comes out of the slit diverts and crosses the three laser beams that are needed for the isotope separation process. The diversion of the metal vapour sheet helps in optimizing the interaction volume between the metal vapour and the laser beams. The temperature of the evaporator can reach up to 800 Centigrade homogeneously along the slit. Less than 800 Centigrade temperature is needed to sublimate the Yb metal (powder form) in the vacuum chamber at about 10-6 mbar as has been tested. The temperature of the evaporator is controlled by the current , which passes through the heating wires. (author)

  11. Construction safety research in the United States: targeting the Hispanic workforce.

    Science.gov (United States)

    Brunette, M J

    2004-08-01

    While it is known that Hispanics have a continuous growing participation in the construction workforce and that their fatal and non-fatal occupational injuries are higher than any other ethnic group, very little construction safety and health research has been conducted in the United States. Research that focuses on safety and health of Hispanic workers employed in the construction industry might prove beneficial in reducing injuries and promoting safe and decent workplaces for all. The purpose of this article was twofold. First, to propose a research agenda where topics such as surveillance, intervention research on high risk occupations, intervention effectiveness evaluation, design and development of effective and appropriate safety training and educational materials, and the socioeconomic impact of injuries and illnesses, are investigated among the Hispanic construction workforce. Second, to present relevant aspects inherent to this particular population that need to be incorporated into the design and development stages of any safety and health research initiative. They include the occupational, social, economic, and cultural background of Hispanic workers; use of a participatory approach, proper selection and use of translation methods; and conducting collaborative research. Certain limitations and challenges related to the availability of resources for conducting safety and health research on Hispanic workers are further discussed.

  12. Chronic back pain among older construction workers in the United States: a longitudinal study.

    Science.gov (United States)

    Dong, Xiuwen S; Wang, Xuanwen; Fujimoto, Alissa; Dobbin, Ronald

    2012-01-01

    This study assessed chronic back pain among older construction workers in the United States by analyzing data from the 1992-2008 Health and Retirement Study (HRS), a large-scale longitudinal survey. Fixed-effects methods were applied in the multiple logistic regression model to explore the association between back pain and time-varying factors (e.g., employment, job characteristics, general health status) while controlling for stable variables (e.g., gender, race, ethnicity). Results showed that about 40% of older construction workers over the age of 50 suffered from persistent back pain or problems. Jobs involving a great deal of stress or physical effort significantly increased the risk of back disorders and longest-held jobs in construction increased the odds of back disorders by 32% (95% CI: 1·04-1·67). Furthermore, poor physical and mental health were strongly correlated with back problems. Enhanced interventions for construction workers are urgently needed given the aging workforce and high prevalence of back disorders in this industry.

  13. Shaft torsional oscillation interactions between turbo-generators in parallel in series compensated transmission systems

    Energy Technology Data Exchange (ETDEWEB)

    Mello, F.P. de

    1994-12-31

    Several investigators have raised the possibility of interaction between shaft systems of parallel units, particularly among identical units. The question addressed in this paper is the significance of this interaction between shaft systems of units coupled through the electrical system. A time domain model of two parallels units connected to an infinite bus trough a series compensated transmission is used to evaluate the phenomena. The same model is used to extract pertinent frequency response functions by Fourier processing of pulse response tests from which a frequency response analysis is performed to lend additional insight into the phenomena. (author) 8 refs., 13 figs., 3 tabs.

  14. Constructing Gyro-free Inertial Measurement Unit from Dual Accelerometers for Gesture Detection

    Directory of Open Access Journals (Sweden)

    Xiangluo WANG

    2014-05-01

    Full Text Available Inertial measurement unit for gesture-based interface is characterized by short sampling time and lower cumulative errors, which indicates that MEMS sensors are suitable for gesture motion detection. This paper presents a configuration scheme of gyro-free micro inertial measurement unit based on dual MEMS accelerometers, and corresponding methods for calculating angular rates and linear accelerations. The unit is constructed from two triaxial MEMS accelerometers with the near- symmetrical layout; two-value solution space of angular rates can be obtained by differential method, by introducing an energy function, the optimum estimation of angular rates can be achieved by solving a convex optimization problem related to function regression; for raising accuracy, Kalman filtering method is used for denoising arguments by defining proper state & observation equations. The unit is small and comparatively easy to hold for its near-symmetrical structure along major axis; corresponding algorithm is free from cumulative errors and easy for implementation. The simulation results show that the scheme and related algorithms are feasible and effective.

  15. Construction

    Science.gov (United States)

    2002-01-01

    Harbor Deepening Project, Jacksonville, FL Palm Valley Bridge Project, Jacksonville, FL Rotary Club of San Juan, San Juan, PR Tren Urbano Subway...David. What is nanotechnology? What are its implications for construction?, Foresight/CRISP Workshop on Nanotechnology, Royal Society of Arts

  16. Solar hot water systems for the southeastern United States: principles and construction of breadbox water heaters

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-02-01

    The use of solar energy to provide hot water is among the easier solar technologies for homeowners to utilize. In the Southeastern United States, because of the mild climate and abundant sunshine, solar energy can be harnessed to provide a household's hot water needs during the non-freezing weather period mid-April and mid-October. This workbook contains detailed plans for building breadbox solar water heaters that can provide up to 65% of your hot water needs during warm weather. If fuel costs continue to rise, the annual savings obtained from a solar water heater will grow dramatically. The designs in this workbook use readily available materials and the construction costs are low. Although these designs may not be as efficient as some commercially available systems, most of a household's hot water needs can be met with them. The description of the breadbox water heater and other types of solar systems will help you make an informed decision between constructing a solar water heater or purchasing one. This workbook is intended for use in the southeastern United States and the designs may not be suitable for use in colder climates.

  17. HYDRAULIC UNITS FOR DRIVING SYSTEMS OF RUNNING EQUIPMENT IN ROAD CONSTRUCTION MACHINERY

    Directory of Open Access Journals (Sweden)

    A. Ja. Kotlobai

    2016-01-01

    Full Text Available Operational efficiency of multi-functional road construction machines depends on number of working bodies which are simultaneously performing technological operations. Systems for propulsion pto to the running equipment drive and active working bodies of road construction machines are developing in the way of using three-axis hydraulic drives. When designing a hydraulic system for road construction machinery dividing of power flow from propulsion to the running equipment drive and active working bodies is considered as rather essential problem. Leading companies do not pay attention to the development of flow divider designs, preferring to produce more expensive multi-flow pumps. One of the ways to increase efficiency of multi-functional road construction machinery is an implementation of running equipment hydraulic driving system based on a mono-aggregate pump unit which consists of a pump and a volumetric divider of power fluid flow. A principle of volumetric division and summing-up of power fluid flows, technical realization and methodology for calculation of key parameters of discrete flow distributors has been developed on the basis of discrete hydraulics regulations. The paper presents results of mathematical modeling of hydraulic systems equipped with the discrete flow distributor. Analysis of a dual-motor hydraulic drive operation has shown the following results: a discrete flow distributor ensures independent load mode of the current consumer circuit operation from the load mode of the second consumer circuit within a wide range of loads; rational value of working fluid flow discretization parameter is the following value interval k = 4–6, maximum value of parameter efficiency is reached when an angular velocity of a distributor rotor coincides with the angular velocity of a pump shaft; discrete flow distributor provides a possibility to change parameters of hydraulic flow feeding in consumers’ pressure lines within a wide range

  18. Nonlinear Disturbance Attenuation Controller for Turbo-Generators in Power Systems via Recursive Design

    NARCIS (Netherlands)

    Cao, M.; Shen, T.L.; Song, Y.H.; Mei, S.W.

    2002-01-01

    The paper proposes a nonlinear robust controller for steam governor control in power systems. Based on dissipation theory, an innovative recursive design method is presented to construct the storage function of single machine infinite bus (SMIB) and multi-machine power systems. Furthermore, the

  19. THE EVOLUTION OF THE DESIGN AND CONSTRUCTION OF MASONRY BUILDINGS IN THE UNITED STATES

    Directory of Open Access Journals (Sweden)

    Richard E. Klingner

    2012-12-01

    Full Text Available In this paper, the process used to develop building codes in the United States of America (USA is summarized, with emphasis on masonry. Masonry materials used in the USA are discussed. Types of masonry construction in the USA are reviewed, addressing historical as well as modern masonry. Current non-structural and structural applications of masonry in the USA are reviewed. Historical development of masonry codes in the USA is summarized, with emphasis on the current Masonry Standards Joint Committee (MSJC Code and Specification. Future trends in that document are predicted. The paper closes with a list of challenges to the masonry industry, and a list of focused research topics intended to meet those challenges.

  20. Cooling tower, construction method method therefor and precast prestressed concrete building units

    International Nuclear Information System (INIS)

    Lin, T.Y.; Yang, Y.C.

    1978-01-01

    A large, thin-shell cooling tower, a method for its erection, and novel precast units are described. Upon a foundation a series of angularly-extending columns is erected, and the columns are joined at their upper ends by a lower ring. Then a ribbed, waffle-like reinforced concrete wall is constructed to extend up from the lower ring and to provide a shell with a shape such as a hyperbolic paraboloid. The ribbed outer (or inner) surface strengthens the structure while enabling the thickness of the portions in between the ribs to be relatively thin. A series of vertically-spaced horizontal circumferential reinforcing bars or post-tensioning cables and a series of horizontally-spaced vertical or inclined bars or cables are included in the wall. The wall is preferably made up from a series of precast units that are of novel structure in themselves. At the top of the wall is an upper ring joining the various elements together

  1. Formation of integrated structural units using the systematic and integrated method when implementing high-rise construction projects

    Science.gov (United States)

    Abramov, Ivan

    2018-03-01

    Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.

  2. Application of unscented Kalman filter for condition monitoring of an organic Rankine cycle turbogenerator

    DEFF Research Database (Denmark)

    Pierobon, Leonardo; Schlanbusch, Rune; Kandepu, Rambabu

    2014-01-01

    the temperature distribution inside the primary heat exchanger by engaging a detailed and distributed model of the system and available measurements. Simulation results prove the robustness of the unscented Kalman filter with respect to process noise, measurement disturbances and initial conditions....... for this project. Considering the plant dynamics, it is of paramount importance to monitor the peak temperatures within the once-through boiler serving the bottoming unit to prevent the decomposition of the working fluid. This paper accordingly aims at applying the unscented Kalman filter to estimate...

  3. Suitableness substantiation of the power units no. 5 and 6 construction in Opole. Power Plant for supercritical steam parameters

    International Nuclear Information System (INIS)

    Wesolowski, I.

    1995-01-01

    The needs of Polish power system up to 2020 are presented in 2 version: stagnation and prosperity. On the base of this prognosis the necessary power growth is calculated and the power balance for both scenarios is given. Against this background the need of construction of 2 450-460 MW units for supercritical steam parameters in Opole Power Plant is discussed in detail mainly from economical point of view. The present state of power plant construction and operation is shortly described. The power plants for supercritical steam parameters operated (or under construction) in the world are listed. (A.S.). 6 refs, 2 figs, 8 tabs

  4. 25 years of experience with closed cycle vapor turbogenerators as primary power source in remote telecommunications projects in Russia and CIS countries

    Energy Technology Data Exchange (ETDEWEB)

    Gropper, J. [ORMAT Industries Ltd., Yavne (Israel)

    2000-07-01

    One of the most severe problems confronting telecommunications projects in extreme arctic environment conditions, with temperatures as low as -60 C, is the supply of continuous, reliable remote power for unattended microwave repeater stations that in many cases cannot be reached by maintenance technicians for months at a time. Another important problem is that the telecommunications equipment must be kept at temperatures between 0 C and +45 C in order to ensure correct electronics operation. The obvious, simple solution of having an electrical heater in the equipment shelter is not practical because of the power required for such a heater. The use of specially designed, arctic type, closed cycle vapor turbogenerators (CCVT) and their associated non-electric heating systems in arctic telecommunication systems has solved both problems: reliable remote power in the range of 400 to 2500 Watts in provided with maintenance requirements reduced to a visit only once in 6 months or more, and required temperature ranges in equipment shelters are maintained, assuring correct operation of the sensitive electronics, without any need of electrical power. During the last 25 years, many major telecommunication projects in Siberia, Alaska and Antarctica have been designed to use and continue to use over 1200 arctic type closed cycle vapor turbogenerators. The CCVTs are designed to operate at nominal power in a range of temperatures from -60 to +45 C and at wind velocity of 120 km/hr, with acceptable gusts of 160 km/hr. They can be fuelled by either arctic kerosene or diesel fuel, or by natural or liquefied gas (LPG) and provide 24 or 48 VDC to the telecommunications equipment. The non-electric heating system associated with the CCVT draws extra heat accumulated in the CCVT's vapor turbogenerator in winter to vaporize a fluid that will transmit 1000 kcal/hr of heat to the equipment shelter or room where telecommunication equipment is located. The heating system is

  5. SparsePak: A Formatted Fiber Field Unit for the WIYN Telescope Bench Spectrograph. I. Design, Construction, and Calibration

    NARCIS (Netherlands)

    Bershady, Matthew A.; Andersen, David R.; Harker, Justin; Ramsey, Larry W.; Verheijen, Marc A. W.

    2004-01-01

    We describe the design and construction of a formatted fiber field unit, SparsePak, and characterize its optical and astrometric performance. This array is optimized for spectroscopy of low surface brightness extended sources in the visible and near-infrared. SparsePak contains 82, 4.7" fibers

  6. Modeling end-of-life pathways of construction and demolition debris in the United States (poster for LCM 2017)

    Science.gov (United States)

    In 2013, the United States generated 530 million tons of construction and demolition debris (CDD), 90% of which was related to demolition. Despite this major contribution to national waste streams, Life Cycle Assessment (LCA) studies and product declarations of buildings and buil...

  7. Wood products used in the construction of low-rise nonresidential buildings in the United States, 2008

    Science.gov (United States)

    David McKeever

    2010-01-01

    Low-rise nonresidential building construction is an important market for lumber, structural wood panels, nonstructural wood panels, and engineered wood products in the United States. This report examines low-rise nonresidential buildings of four or fewer stories only. Buildings with five or more stories are normally severely restricted by building code from being wood...

  8. Carbon Mitigation Impacts of Increased Softwood Lumber and Structural Panel Use for Nonresidential Construction in the United States

    Science.gov (United States)

    Prakash Nepal; Kenneth E. Skog; David B. McKeever; Richard D. Bergman; Karen L. Abt; Robert C. Abt

    2016-01-01

    More wood use in the United States to construct low-rise nonresidential (NR) buildings would increase consumption and production of softwood (SW) lumber, engineered wood products, and structural and nonstructural wood panels. Using a consequential life-cycle analysis, we estimated the change in net CO2 emissions thatwould be caused by increased...

  9. Occupational safety issues in residential construction surveyed in Wisconsin, United States.

    Science.gov (United States)

    Choi, Sang D; Carlson, Kathryn

    2014-01-01

    Residential construction is a high-risk industry in the U.S. due to the exposure to work-related safety hazards and fall injuries. This study aimed to examine the safety training and safe work practices of construction workers within the small residential construction industry. In order to achieve the study objectives, a survey was designed and sent to approximately 200 Wisconsin based residential construction contractors. About one third of the respondents stated that they did not have any form of safety programs. The study indicated that the most common types of work-related injuries in residential construction were slips/trips/falls and cuts/lacerations. The survey findings also suggested that the residential construction contractors needed to increase the utilization of fall protection safety equipment. Further education and subject matter expert training could provide benefits to improve occupational safety and health of the small business workforce in the residential construction industry.

  10. Inventing Wastewater: The Social and Scientific Construction of Effluent in the Northeastern United States

    Science.gov (United States)

    Brideau, J. M.; Ng, M.; Hoover, J. H.; Hale, R. L.; Thomas, B.; Vogel, R. M.; Northeast ConsortiumHydrologic Synthesis Summer Institute, 2010--Biogeochemistry

    2010-12-01

    Title: Inventing Wastewater: The Social and Scientific Construction of Effluent in the Northeastern United States Authors: Jeffrey Brideau, Melissa Ng, Joseph Hoover, Rebecca Hale, Brian Thomas, and Richard Vogel Presented by: Jeffrey Brideau B.A., M.A., PhD Candidate, Department of History, University of Maryland Regulation of pollution is a prevalent part of contemporary American society. Scientists and policy makers have established acceptable effluent thresholds, with the ostensible goal of protecting human and stream health. However, this ubiquity of regulation is a recent phenomenon, and institutional mechanisms for effluent control were virtually non-existent in the early 20th century. Nonetheless, these same decades witnessed the emergence of nascent efforts at water pollution abatement. This project aims to explore social and scientific perceptions of wastewater, and begins with the simple premise that socio-cultural values underlay human decision-making in water management, and that wastewater is imbued with a matrix of human values that are continuously renegotiated. So what were the primary motivations for abatement efforts? Were they aesthetic and olfactory, or scientific concern for public and stream health? This paper proposes that there are social as well as scientific thresholds for pollutant loads. Collaborating with a team of interdisciplinary researchers we have created and aggregated discrete data sets to model, using export coefficient and linear regression modeling techniques, historic pollutant loading in the Northeastern United States. Concurrently, we have drawn on historical narratives of agitation by abatement advocates, nuisance laws, regulatory regimes, and changing scientific understanding; and contrasting the modeling results with these narratives allows this project to quantitatively determine where social thresholds lay in relation to their scientific counterparts. This project’s novelty lies in its use of existing narratives of

  11. Unit 1 and Unit 2 Nuclear Power Plant Mochovce construction finishing from primary contractor of technological part. Skoda Praha a. s. point of view

    International Nuclear Information System (INIS)

    Horky, F.

    2000-01-01

    In this paper the history of delivery of technological part for NPP V-1 Mochovce as well as of reconstruction and safety improvements by the Skoda Praha a.s. is presented. Primary contractor of technological part Skoda Praha together with its final suppliers proved ability to realize under hard conditions such a complicated work what was indisputedly Units 1 and 2 finishing. Company proved capability to conform itself flexibly in the course of work to requirements of customer for realization of safety measures which means that Units 1 and 2 fully satisfy international standards. By fulfilment of primary contractor of technology obligations and above all by takeover of complex responsibility for both Units putting in operation including responsibility for 'past' Skoda Praha put away one of basic problems which occurred in decision making to whom will be assigned construction finishing contract. These facts fully qualify Skoda Praha to be selected for possible Units 3 and 4 construction finishing as one of chief construction finishing participant

  12. Active learning units interrelated using TIC’s tools in architectural construction

    Directory of Open Access Journals (Sweden)

    Núria Martí Audí

    2013-08-01

    Full Text Available 0 0 1 141 779 USAL 6 1 919 14.0 Normal 0 21 false false false ES JA X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Tabla normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:Calibri; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-ansi-language:ES; mso-fareast-language:EN-US;} The presence of new technologies in the university world is a matter of fact. Nevertheless, it has not always blended correctly as in many cases TIC incorporation has not taken alumni opinion understood as final users. A correct implementation might evaluate some variables as satisfaction, need, interest and finally that versatility to adapt it to proficient professional training on a regular basis. This paper analyses a new approach to learning in the field of Architectural Construction based on a series of strategically designed and interactive units. The centre of these is the collaborative project; this is based on complex problem-solving situations akin to the professional world; where theory and practice are combined in a discovery-learning process. The tools of Information and Communication Technology are applied, simultaneously facilitating the student’s autonomy in acquiring skills and knowledge.

  13. Construction and validation of a tool to Assess the Use of Light Technologies at Intensive Care Units 1

    Science.gov (United States)

    Marinho, Pabliane Matias Lordelo; Campos, Maria Pontes de Aguiar; Rodrigues, Eliana Ofélia Llapa; Gois, Cristiane Franca Lisboa; Barreto, Ikaro Daniel de Carvalho

    2016-01-01

    ABSTRACT Objective: to construct and validate a tool to assess the use of light technologies by the nursing team at Intensive Care Units. Method: methodological study in which the tool was elaborated by means of the psychometric method for construction based on the categorization of health technologies by Merhy and Franco, from the National Humanization Policy, using the Nursing Intervention Classification taxonomy to categorize the domains of the tool. Agreement Percentages and Content Validity Indices were used for the purpose of validation. Results: The result of the application of the Interrater Agreement Percentage exceeded the recommended level of 80%, highlighting the relevance for the proposed theme in the assessment, with an agreement rate of 99%. Conclusion: the tool was validated with four domains (Bond, Autonomy, Welcoming and Management) and nineteen items that assess the use of light technologies at Intensive Care Units. PMID:27992025

  14. Longrun supply and demand of new residential construction in the United States: 1986 to 2040.

    Science.gov (United States)

    Claire A. Montgomery

    1989-01-01

    A model of U.S. housing demand and supply was developed that projects housing starts for use in long-term forest planning. Housing demand was shown to respond to the current sale price and the user capital cost of housing and to the size and age composition of the population. Current sale price is determined in the new construction market. Supply of new construction...

  15. Economics of residential gas furnaces and water heaters in United States new construction market

    OpenAIRE

    Lekov, Alex B.

    2009-01-01

    New single-family home construction represents a significant and important market for the introduction of energy-efficient gas-fired space heating and water-heating equipment. In the new construction market, the choice of furnace and water-heater type is primarily driven by first cost considerations and the availability of power vent and condensing water heaters. Few analysis have been performed to assess the economic impacts of the different combinations of space and water-heating equipment....

  16. Wood products used in constructing conservation and development projects by the Corps of Engineers in the United States, 1962 and 1978

    Science.gov (United States)

    W. H. Reid; D. B. McKeever

    Estimates of the amounts of wood products used in constructing civil conservation and development projects by the Corps of Engineers in the United States are presented for the years 1962 and 1978. Amounts of lumber, laminated lumber, poles and piling, and plywood used in construction are stratified by five construction categories, and three types of uses. Estimates of...

  17. Parametric sensitivity of two axis models for turbo-generators; Sensibilidad parametrica de modelos de dos ejes para turbogeneradores

    Energy Technology Data Exchange (ETDEWEB)

    Morales Castorena, Armando

    2003-06-15

    The results of parameter sensitivity studies performed on two axis equivalent circuits (TAECs) of synchronous machines are presented in this thesis. The circuits consist of inductive and resistive elements. Their connectivity represents the magnetic and electric coupling inside the machine as well as its energy losses. Two equivalent circuits are needed to represent the machine, one for the direct axis (d) and another for the quadrature axis (q), because it is modeled under the two-axis reaction theory of Park. Parameter values have been identified in advance, using standstill frequency response tests (SSFR). This response was calculated using a finite element model of a turbine generator. The parameter identification is achieved by applying an optimization process based on a hybrid algorithm (stochastic-deterministic). The fitness function is defined as the square of the differences between magnitudes and phase angles of the frequency response functions of the TAECs and of the turbogenerator. This procedure yields the TAECs that better fit the frequency response of the machine. Thus, the circuits identified are considered good models of the machine and they can be applied for digital simulation of dynamic behavior. The identified TAECs are the basis of the parameter sensitivity studies reported here. These studies consist of doing very small variations to parameter values, and to calculate the new value of the fitness function. The ratio between the change of the fitness function to the change in parameter value is called sensitivity of the fitness function, or simply, sensitivity function. Its magnitude indicates which parameter has a greater or lesser influence on the fitness function. If the fitness function is very sensitive to a particular parameter, then the rightness of the identified value of that parameter may be in doubt. With this information it is possible to establish the reliability of the identification process and to exert corrective actions. It is

  18. Evolution of the constructive adobe system in the Porcelain Industrial Unit of Vista Alegre (1937-1945

    Directory of Open Access Journals (Sweden)

    Alice Ruano

    2010-01-01

    Full Text Available The urban nucleus of the Porcelain Factory of Vista Alegre reveals a special interest in terms of the evolution of the traditional adobe construction in the town of Ílhavo, located in the district of Aveiro. Presenting a structured philosophy of intervention in the territory since its very beginning, it possesses a rich heritage in the field of construction and architecture. The measures planned and implemented in the second phase of Vista Alegre growth reporting its beginning to the ends of the 30's, and along the 40's, confirm it both in the rehabilitation, extension and new constructions in adobe masonry. Those measures were implemented during the structural changes of the Industrial Unit administration that only until this period belonged to the family of its founder. These changes creates one of the focus of innovation in the region, with new construction strategies and solutions in adobe buildings, which will prolonged the period of use of this construction system, noticeable in buildings dated of 1958 in the Vista Alegre and at least in 1970 in the town.

  19. Geospatial Analysis of Construction Labor Wage Rates in the United States of America

    Science.gov (United States)

    2014-03-27

    24.21 Honolulu, HI 46520 $31.53 $33.44 $29.88 $25.16 $33.95 $36.56 $24.27 $30.00 $33.77 $23.19 $31.10 $31.25 Hot   Springs , AR 26300 $15.40 $18.08 $11.03...systems like geothermal and photovoltaic, limit the use of innovative construction delivery methods, force contractors to comply with non-standard...analyzed. The DBA will be discussed in more detail later in this chapter. Military Construction In the spring of 2013, the DoD released The

  20. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XXIX, REVIEWING THE CONSTRUCTION OF ENGINE COMPONENTS.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO PROVIDE A REVIEW OF THE CONSTRUCTION AND OPERATION OF DIESEL ENGINE COMPONENTS. TOPICS ARE STATIONARY PARTS, ENGINE MOVING PARTS, PISTON RINGS, AND CONNECTING RODS AND PISTON PINS. THE MODULE CONSISTS OF AN INSTRUCTOR'S GUIDE, TRANSPARENCIES, A LIST OF SUGGESTED SUPPLEMENTARY MATERIALS, AND TRAINEE…

  1. Economics of residential gas furnaces and water heaters in United States new construction market

    Energy Technology Data Exchange (ETDEWEB)

    Lekov, Alex B.; Franco, Victor H.; Wong-Parodi, Gabrielle; McMahon, James E.; Chan, Peter

    2009-05-06

    New single-family home construction represents a significant and important market for the introduction of energy-efficient gas-fired space heating and water-heating equipment. In the new construction market, the choice of furnace and water-heater type is primarily driven by first cost considerations and the availability of power vent and condensing water heaters. Few analysis have been performed to assess the economic impacts of the different combinations of space and water-heating equipment. Thus, equipment is often installed without taking into consideration the potential economic and energy savings of installing space and water-heating equipment combinations. In this study, we use a life-cycle cost analysis that accounts for uncertainty and variability of the analysis inputs to assess the economic benefits of gas furnace and water-heater design combinations. This study accounts not only for the equipment cost but also for the cost of installing, maintaining, repairing, and operating the equipment over its lifetime. Overall, this study, which is focused on US single-family new construction households that install gas furnaces and storage water heaters, finds that installing a condensing or power-vent water heater together with condensing furnace is the most cost-effective option for the majority of these houses. Furthermore, the findings suggest that the new construction residential market could be a target market for the large-scale introduction of a combination of condensing or power-vent water heaters with condensing furnaces.

  2. Design and construction of a reflux column distillation unit for bio ...

    African Journals Online (AJOL)

    A bio-ethanol distilling tank was designed and constructed to distil ethanol from sugarcane substrate. The machine has a capacity to process 200 litres of substrate at full load of the boiler. The distiller has an Internal Reflux Still Condenser (IRSC) that controls the intemal re-distillation process and the separation of the final ...

  3. Polarization splitting phenomenon of photonic crystals constructed by two-fold rotationally symmetric unit-cells

    Science.gov (United States)

    Yasa, U. G.; Giden, I. H.; Turduev, M.; Kurt, H.

    2017-09-01

    We present an intrinsic polarization splitting characteristic of low-symmetric photonic crystals (PCs) formed by unit-cells with C 2 rotational symmetry. This behavior emerges from the polarization sensitive self-collimation effect for both transverse-magnetic (TM) and transverse-electric (TE) modes depending on the rotational orientations of the unit-cell elements. Numerical analyzes are performed in both frequency and time domains for different types of square lattice two-fold rotational symmetric PC structures. At incident wavelength of λ = 1550 nm, high polarization extinction ratios with ˜26 dB (for TE polarization) and ˜22 dB (for TM polarization) are obtained with an operating bandwidth of 59 nm. Moreover, fabrication feasibilities of the designed structure are analyzed to evaluate their robustness in terms of the unit-cell orientation: for the selected PC unit-cell composition, corresponding extinction ratios for both polarizations still remain to be over 18 dB for the unit-cell rotation interval of θ = [40°-55°]. Taking all these advantages, two-fold rotationally symmetric PCs could be considered as an essential component in photonic integrated circuits for polarization control of light.

  4. Closure Report for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2003-03-01

    Corrective Action Unit (CAU) 425 is located on the Tonopah Test Range, approximately 386 kilometers (240 miles) northwest of Las Vegas, Nevada. CAU 425 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and is comprised of one Corrective Action Site (CAS). CAS 09-08-001-TA09 consisted of a large pile of concrete rubble from the original Hard Target and construction debris associated with the Tornado Rocket Sled Tests. CAU 425 was closed in accordance with the FFACO and the Nevada Division of Environmental Protection-approved Streamlined Approach for Environmental Restoration Plan for CAU 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada (U.S. Department of Energy, Nevada Operations Office, 2002). CAU 425 was closed by implementing the following corrective actions: The approved corrective action for this unit was clean closure. Closure activities included: (1) Removal of all the debris from the site. (2) Weighing each load of debris leaving the job site. (3) Transporting the debris to the U.S. Air Force Construction Landfill for disposal. (4) Placing the radioactive material in a U.S. Department of Transportation approved container for proper transport and disposal. (5) Transporting the radioactive material to the Nevada Test Site for disposal. (6) Regrading the job site to its approximate original contours/elevation.

  5. Active learning units interrelated using TIC’s tools in architectural construction

    OpenAIRE

    Núria Martí Audí; David Fonseca Escudero

    2013-01-01

    The presence of new technologies in the university world is a matter of fact. Nevertheless, it has not always blended correctly as in many cases TIC incorporation has not taken alumni opinion understood as final users. A correct implementation might evaluate some variables as satisfaction, need, interest and finally that versatility to adapt it to proficient professional training on a regular basis. This paper analyses a new approach to learning in the field of Architectural Construction ...

  6. Construction and start-up testing experience of Kashiwazakikariwa Nuclear Power Station Unit No.1

    International Nuclear Information System (INIS)

    Natsume, Nobuo; Murakami, Hideaki

    1986-01-01

    In order to overcome the new location condition in Japan Sea coast, new techniques were developed and adopted to ensure the safety in construction and to shorten the construction period as far as possible. The commercial operation was started on September 18, 1985. This plant is a BWR plant of 1100 MWe output. The results of the improvement and standardization of BWRs and the measures for reliability improvement and radiation dose reduction were fully adopted in this plant. The site of the power station and the layout of the main facilities are explained. As the features of the location condition, the severe weather condition in winter such as snow, wind and lightning and high waves in the sea were considered. The rockbed for installing the foundation of the reactor building was deep, and the aseismatic design condition was made stricter, accordingly, the quantity of materials increased. A tent dome was developed to cover above the reactor containment vessel being assembled, a lightning forecast system was installed, and synchro-lift method was adopted for caisson breakwaters. The countermeasures to the deep rockbed and the measures to shorten the construction period were taken. The results of the trial operation are reported. (Kako, I.)

  7. The Solution Set of Interval Linear Equations is Homeomorphic to the Unit Cube: An Explicit Construction

    Czech Academy of Sciences Publication Activity Database

    Rohn, Jiří

    2015-01-01

    Roč. 21, November (2015), s. 25-34 ISSN 1573-1340 Institutional support: RVO:67985807 Keywords : interval linear equations * solution set * unit cube * homeomorphism * absolute value equation Subject RIV: BA - Gen eral Mathematics http://interval.louisiana.edu/reliable-computing-journal/volume-21/reliable-computing-21-pp-025-034.pdf

  8. Design and Construction of a Positron Emission Tomography (PET) Unit and Medical Applications with GEANT Detector Simulation Package

    Energy Technology Data Exchange (ETDEWEB)

    Karagoz, Muge [Bogazici Univ., Istanbul (Turkey)

    1998-01-01

    In order to investigate the possibility of the construction of a sample PET coincidence unit in our HEP laboratory, a setup with two face to face PMTs and two 2x8 Csi(Tl) scintillator matrices has been constructed. In this setup, 1-D projections of a pointlike 22 Na positron source at different angles have been measured. Using these projections a 2-D image has been formed. Monte Carlo studies of this setup have been implemented using the detector simulation tool in CERN program library, GEANT. Again with GEANT a sample human body is created to study the effects of proton therapy. Utilization of the simulation as a pretherapy tool is also investigated.

  9. Regulatory inspection activities on nuclear power plant sites during construction in the United Kingdom

    International Nuclear Information System (INIS)

    Jeffery, J.V.

    1977-01-01

    The work of regulatory inspection of the construction of the plant on the site is performed not only by the inspector who has been allocated to inspection duties for that site but also by the specialist staff who are involved with the safety assessment of the plant. The co-ordination of this work is described in the paper and examples are given of inspection activities associated with the enforcement requirements of licence conditions as well as those related to the inspection of the plant itself. (author)

  10. Parenting and the workplace: The construction of parenting protections in United States law

    Directory of Open Access Journals (Sweden)

    Eichner Maxine

    2008-08-01

    Full Text Available Abstract In this paper, I discuss the shortcomings of the legal protections that exist for pregnancy, breastfeeding, and parenting for United States' workers. The two main sources of protection for pregnancy and parenting in United States employment law are the Pregnancy Discrimination Act (PDA and the Family and Medical Leave Act (FMLA. Both, I argue, contain inadequate protections for the needs of pregnant women and breastfeeding mothers, as well as their infants. I consider what it is about the way these statutes conceptualize the needs of pregnant women, mothers, and their babies, that prevents more robust protection of their needs. I then compare the minimal protection afforded American women and families with more progressive policies in other countries to highlight the possibilities that arise when the state affirmatively supports working parents and their children.

  11. Construction of a Labview controlled pyrolysis unit for coupling to a Pyrola 85 pyrolysis chamber

    OpenAIRE

    Östman, Marcus; Näsström, Elin

    2012-01-01

    Pyrolysis is the process of molecular decomposition in an inert environment using heat. It is possible to fragment large molecules, such as polymers, by pyrolysis and separate the fragments directly in a GC. This makes it possible to form complex sample fingerprints that can be used in various applications, for example in forensic science. In this project, a malfunctioning Pyrola 85 pyrolysis unit was fixed by measuring the voltage signals from the photo diode during pyrolysis in a Labview pr...

  12. Impacts of the turbogenerator reactive operation in the nuclear fuel burnup; Impactos da operacao reativa do turbogerador na queima do combustivel nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Helio Ricardo V. de; Martinez, Aquilino S. [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia. Programa de Engenharia Nuclear

    2002-07-01

    The parameterization of the losses in a turbogenerator in function of an operation with the electrical system reactive allowed to model in a simple and exact way the equations that define and they quantify the additional of nuclear potency that it should be generated by a reactor, in order to maintain the commitment with the national system operator, that is, the electric active power contracted. starting from this additional of nuclear power it was modeled the additional burn up of the fuel elements, as well as the numbers of effective days to full power wasted. it was promoted a safety analysis and some limitations due to the reactive operation of the electrical system. inside of this context it was made a financial evaluation in which we ask some questions to companies and government organs in order to define what losses are acceptable and also the reason why we don't use other technician resources such as: increase of the electrical mesh, electrical power injection in strategic points, capacitor banks and increase of the number the electrical plants. (author)

  13. Failure analysis to the weights of balance of a 350 MW turbo-generator; Analisis de falla a los pesos de balanceo de un turbogenerador de 350 MW

    Energy Technology Data Exchange (ETDEWEB)

    Vital Flores, Francisco; Gamero Arroyo, Jose Manuel [LAPEM, Comision Federal de Electricidad (Mexico)

    2007-11-15

    The selection of materials and the quality control in the supply of the components, as well as the involved operative variables in the process of work to which an equipment, device or a system of a power station of electrical generation are subjected, impact in the same in their useful life in a decisive way. In this document it is presented an analysis of a failure occurred in a 350 MW turbo-generator by the loosening of the balance weights, in which it is mentioned the flaws occurred by this cause and a metallographic analysis that indicates the main fault for the happening. [Spanish] La seleccion de material y el control de calidad en los suministros de los componentes, asi como las variables operativas involucradas en el proceso de trabajo al cual es sometido un equipo, dispositivo o un sistema de una central de generacion electrica, impactan en los mismos de manera decisiva en su vida util. En este documento se presenta un analisis de falla ocurrido en un turbogenerador de 350 MW, por el desprendimiento de los pesos de balanceo, el cual se menciona de los desperfectos ocurridos por esta causa y un analisis metalografico que indica la falla principal por lo ocurrido.

  14. Characterization and constructive utilization of sludge produced in clari-flocculation unit of water treatment plant

    Science.gov (United States)

    Ahmad, Tarique; Ahmad, Kafeel; Alam, Mehtab

    2018-03-01

    All water treatment plants produce waste/residue amid the treatment of raw water. This study selectively investigates the clariflocculator sludge for its physicochemical characteristics and potential reuse options. Sieve analysis, XRF, SEM, XRD, FTIR, and TG-DTA instrumental techniques have been used to characterize the sludge sample. Results show that clariflocculator sludge contains about 78% fine sand having grain size range 150-75 μm. SiO2, Al2O3, Fe2O3 and CaO constitute the maximum percentage of chemical compounds present in the sludge and quartz is the main crystalline phase of the sludge. Recycling and reuse of this sludge, especially, as fine sand in preparing mortar, concrete mix and other civil engineering products would pave the way for constructive utilization with safe and sustainable sludge management strategies.

  15. The internal structure of the unit performance construct as measured by the performance index (PI1

    Directory of Open Access Journals (Sweden)

    Roline Henning

    2004-10-01

    Full Text Available The objective of this study was to investigate the internal structure of the Performance Index in order to establish the interrelationships between the eight unit performance latent variables. The present study forms part of a larger study aimed at validating the Leadership Behaviour Inventory (LBI (Spangenberg & Theron, 2002b against work unit performance. The validation sample, after imputation of missing values, consisted of 273 cases with observations on all 56 items. Item analysis and dimensionality analysis was performed on each of the sub-scales using SPSS-windows. Thereafter, confirmatory factor analysis was performed on the reduced data set using LISREL. The results indicated satisfactory factor loadings on the measurement model. Acceptable model fit was achieved. Subsequently, the structural model was tested using LISREL. The results provided statistics of good fit. Only four hypotheses failed to be corroborated in this study. The results are discussed and suggestions for further research are made. Opsomming Die doel van hierdie studie was om die interne struktuur van die Performance Indexs (PI (Spangenberg en Theron, 2002b te ondersoek ten einde die interverwantskappe tussen die agt latente eeheidprestasiedimensies te bepaal. Hierdie studie vorm deel van ’n meer omvattende studie wat daarop gemik is om die Leadership Behaviour Inventory (LBI teen werkeenheidprestasie te valideer. Die steekproef, na imputasie van ontbrekende waardes, het uit 273 gevalle bestaan met waarnemings ten opsigte van al 56 items. Item- en dimensionaliteitontledings is met behulp van SPSS-windows op elke subskaal gedoen. Bevestigende faktorontleding is daarna met behulp van LISREL op die verkleinde datastel uitgevoer. Die resultate het op bevredigende faktorbeladings vir die metingsmodel en ’n bevredigende passing van die metingsmodel gedui. Daarna is die strukturele model met behulp van LISREL getoets. Die resultate het bevredigende passing getoon, met

  16. Perspectives for utilization of the experience from the electrical equipment modernization of Kozloduy NPP units 5 and 6 in case of construction of new NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2005-01-01

    In 2005 a governmental decision for continue the project for construction of Belene NPP was adopted. In case of start of this significant project in short terms, a good option will be to utilize the already achieved experience by the modernization program of units 5 and 6 of Kozloduy NPP. The process of construction of new NPP is associated with significant amount of engineering, civil construction works, equipment order and delivery, installation works, testing and commissioning activities. It is vital necessity to have optimal technology, strict organization for project implementation and excellent documentation. From technical point of view the experience from the modernization of units 5 and 6 of Kozloduy NPP will be very important in case of utilization of similar types of WWER 1000 units. According to the 'Feasibility study for construction of Belene NPP', the most favorable option is to accomplish the already partially constructed Unit 1 on the basis of upgraded WWER B-320 design - WWER 1000 B-392, in order to fulfill IEC 331-3A, IEC 332-3A, and of US NRC Regulatory Guide 1.70 and to construct the second unit on the basis of ASE WWER/1000 B-466. However, for any type of unit selected, the achieved experience will be an important basis. This article is focused mostly on the modernization aspects of some electrical systems of Kozloduy NPP

  17. Construction, evaluation and demonstration of mobile catalytic combustion units for destruction of methane and different odor pollutants

    Energy Technology Data Exchange (ETDEWEB)

    Jannasch, Anna-Karin [Catator AB, Lund (Sweden)

    2012-02-15

    This project reports on the construction, the evaluation and the demonstration of novel, mobile small-scale (< 100 Nm{sup 3}/h) combustion units for reduction of methane and/or different odour pollutants (e.g. hydrogen sulfide, ammonia, VOC) existing in small concentrations in process air streams. The evaluated units include a regenerative (MeshRegenOx/MRO) and a recuperative, catalytic unit (Deodoron), respectively, which both are based on Catator's proprietary wire mesh catalyst technology. The evaluation and the demonstration work have involved laboratory tests with synthetic gases and a number of field tests at plants for biogas production, water and waste treatment. The results show that: 1. In comparison to conventional thermal emission abatement systems, the wire mesh catalyst technology opens up for the construction of very compact (V=0.6 Nm, W=500 kg for 1000 Nm{sup 3}/h) and thermo-economical systems (> 95 %), which technology can easily be scaled up and integrated into existing industrial and/or process streams. 2. Catator's MRO-prototype enables for autothermal oxidation of methane, with a conversion degree of 97-98 %, from an inlet concentration of 0.2 vol% at an operation temperature of 660-700 deg, i.e. 200-300 deg less than when conventional homogenous flame combustion is applied. 3. The performance of the MRO-unit was seen to be somewhat unstable, with an oscillating conversion degree during the operation cycle. This should however be able to overcome by further optimizing the integrated catalyst package and the heat exchanger. Significant improvements in efficiency and stability are also to be expected by the scale-up due to a decreasing heat loss with an increasing capacity 4. Close to 100 % removal of different odorants, with a thermal efficiency of around 80 %, can be obtained by the use of Catator's unit Deodoron at an operation temperature of 300-400 deg. The results were verified by odor tests performed up- and downstream the

  18. "Welfare queens" and "teen moms": how the social construction of fertile women impacts unintended pregnancy prevention policy in the United States.

    Science.gov (United States)

    James, E Angel; Rashid, Moira

    2013-01-01

    In the United States, unintended pregnancy is a serious health, social, and economic concern. However, the existing prevention policies have proven ineffective at decreasing the rate of unintended pregnancy at a national level. This lack of effective national prevention policy is better understood when viewed through the lens of a policy theory that incorporates an understanding of social construction and its effects on policy development. Through the application of one such policy theory, this article explores how the social construction of fertile women in the United States affects previous and recently enacted unintended pregnancy prevention policies.

  19. Design, construction, operation, and evaluation of a prototype culm-combustion boiler/heater unit. Quarterly technical progress report, October 1-December 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    1981-02-01

    This report provides a summary of the work performed on the Prototype Culm Combustion Boiler/Heater Unit, Phase I - Engineering Design and Analysis and Phase II - Prototype Plant Construction during the period October 1, 1980 through December 31, 1980. The objectives of the program as well as the technical progress and problem areas encountered during the reporting period are presented. The final detail design effort was completed and the final design report submitted. Progress on procurement activity authorized by full Phase II release on March 20, 1980, is discussed. Following approval by DOE, a purchase order was placed with the Norflor Construction Corporation for the prototype plant construction which began in November. Construction of the access roadway installation of the electric power, sewer and water lines was completed during this reporting period. Boiler construction continued.

  20. ADRE, uso intensivo del ploteo orbital en el diagnóstico de turbogeneradores // ADRE, intensive use of the orbital plot in turbogenerators diagnosis.

    Directory of Open Access Journals (Sweden)

    E. Palomino Marín

    2000-10-01

    themultichanal system ADRE®, employee as system of monitoring off-line. The most excellent results in the investigation, aresustained in the use of the presence of relative movement and seismic transducers under the supervision of theVIBROCONTROL®, through which and with the intervention of the ADRE® system, is possible to identify inadequacies in theon-line monitoring and standing defects are diagnosed in the turbogenerator, including sequels left in this by transitory defects.Key words: seismic transducer, transducer of eddy currents, orbit, phase, keyphasor.

  1. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Pwer Station

    International Nuclear Information System (INIS)

    Ueyama, Koreyasu

    1982-01-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported. (Wakatsuki, Y.)

  2. Constructing Cost-Effective Crystal Structures with Table Tennis Balls and Tape That Allows Students to Assemble and Model Multiple Unit Cells

    Science.gov (United States)

    Elsworth, Catherine; Li, Barbara T. Y.; Ten, Abilio

    2017-01-01

    In this letter we present an innovative and cost-effective method of constructing crystal structures using Dual Lock fastening adhesive tape with table tennis (ping pong) balls. The use of these fasteners allows the balls to be easily assembled into layers to model various crystal structures and unit cells and then completely disassembled again.…

  3. Environmental Assessment for Construction of the United States Air Force Technical Application Center (AFTAC) on Patrick Air Force Base, Florida (Amended)

    Science.gov (United States)

    2010-07-01

    architectural , and Native American resources. Areas of potential impact include properties, structures, landscapes, or traditional cultural sites...occur before packaging). Laboratory processes, storage and handling will be coordinated with 45 SW units of Bioenvironmental , Wing Safety, Medical...1994. Historical and Architectural Documentation Reports of Patrick Air Force Base, Cocoa Beach, Florida. U.S. Army Construction Engineering

  4. Construction and validation of a tool to Assess the Use of Light Technologies at Intensive Care Units.

    Science.gov (United States)

    Marinho, Pabliane Matias Lordelo; Campos, Maria Pontes de Aguiar; Rodrigues, Eliana Ofélia Llapa; Gois, Cristiane Franca Lisboa; Barreto, Ikaro Daniel de Carvalho

    2016-12-19

    to construct and validate a tool to assess the use of light technologies by the nursing team at Intensive Care Units. methodological study in which the tool was elaborated by means of the psychometric method for construction based on the categorization of health technologies by Merhy and Franco, from the National Humanization Policy, using the Nursing Intervention Classification taxonomy to categorize the domains of the tool. Agreement Percentages and Content Validity Indices were used for the purpose of validation. The result of the application of the Interrater Agreement Percentage exceeded the recommended level of 80%, highlighting the relevance for the proposed theme in the assessment, with an agreement rate of 99%. the tool was validated with four domains (Bond, Autonomy, Welcoming and Management) and nineteen items that assess the use of light technologies at Intensive Care Units. construir e validar um instrumento para avaliação do uso de tecnologias leves, pela equipe de enfermagem, em Unidades de Terapia Intensiva. estudo metodológico no qual o instrumento foi elaborado utilizando o método psicométrico para construção com base na categorização das tecnologias em saúde de Merhy e Franco, da Política Nacional de Humanização, utilizando-se a taxonomia Nursing Intervention Classification para categorizar os domínios do instrumento. Utilizou-se o Percentual de Concordância e o Índice de Validade de Conteúdo (IVC) para validação. o resultado da aplicação do Percentual de Concordância entre os juízes foi superior ao recomendado de 80%, havendo destaque na avaliação da pertinência ao tema proposto, apresentando um percentual de concordância de 99%. o instrumento foi validado com quatro domínios (Vínculo, Autonomia, Acolhimento e Gestão) e dezenove itens que avaliam o uso das tecnologias leves em Unidade de Terapia Intensiva. construir y validar un instrumento para evaluación del uso de tecnologías leves, por el equipo de enfermer

  5. The greenhouse gas and energy impacts of using wood instead of alternatives in residential construction in the United States

    International Nuclear Information System (INIS)

    Upton, Brad; Miner, Reid; Spinney, Mike; Heath, Linda S.

    2008-01-01

    Data developed by the Consortium for Research on Renewable Industrial Materials were used to estimate savings of greenhouse gas emissions and energy consumption associated with use of wood-based building materials in residential construction in the United States. Results indicate that houses with wood-based wall systems require 15-16% less total energy for non-heating/cooling purposes than thermally comparable houses employing alternative steel- or concrete-based building systems. Results for non-renewable energy consumption are essentially the same as those for total energy, reflecting the fact that most of the displaced energy is in fossil fuels. Over a 100-year period, net greenhouse gas emissions associated with wood-based houses are 20-50% lower than emissions associated with thermally comparable houses employing steel- or concrete-based building systems. Assuming 1.5 million single-family housing starts per year, the difference between wood and non-wood building systems represents about 9.6 Mt of CO 2 equivalents per year. The corresponding energy benefit associated with wood-based building materials is approximately 132 PJ year -1 . These estimates represent about 22% of embodied energy and 27% of embodied greenhouse gas emissions in the residential sector of the US economy. The results of the analysis are very sensitive to assumptions and uncertainties regarding the fate of forestland that is taken out of wood production due to reduced demand for wood, the continued production of co-products where demand for wood products is reduced, and the rate at which carbon accumulates in forests

  6. Final environmental statement related to construction of Skagit Nuclear Power Project Units 1 and 2: (Docket Nos. 50-522 and 50-523)

    International Nuclear Information System (INIS)

    1975-05-01

    The proposed action is the issuance of construction permits to the Pudget Sound Power and Light Company, Pacific Power and Light Company, Washington Water Power Company and the Washington Public Power Supply System, for the construction of Skagit Nuclear Power Projects Units 1 and 2 (Docket Nos. 50-522 and 50-523) in Skagit County, Washington (about 64 miles north of Seattle and 6 miles ENE of Sedro Woolley). These units are scheduled for commercial service in 1982 and 1985, respectively. Each unit will employ a boiling-water nuclear reactor with a maximum expected thermal power level of 4100 MWt, which is considered in the assessments contained in this statement. At the 3800 MWt power level initially to be licensed, the net electrical capacity of each unit will be 1288 MWe. The exhaust steam from the turbine-generators will be cooled in condensers which will utilize one hyperbolic-type natural-draft cooling tower per unit to dissipate heat to the atmosphere. Water (106 cfs max.) for the cooling tower makeup (82.4 cfs) and other plant uses will be withdrawn from the Skagit River through Ranney Collectors embedded in the north bank of the river and pumped to the plant through a pipeline about 35,000 ft. long. Cooling tower blowdown (7 cfs max.) from the project and dilution water (20 cfs max.) will flow through a pipeline back to the river where it will be discharged through a diffuser

  7. Inspection of 900 MW turbogenerators

    International Nuclear Information System (INIS)

    Sol, J.-C.

    1979-01-01

    Surveillance can generally be conceived as a three stage operation: the measurement of certain physical quantities relating to the systems to be watched; the processing of these measurements to extract from them the appropriate surveillance parameters or descriptors; the application of criteria to these descriptors so as to interpret them in terms of system states (vis-a-vis certain possible defects, for instance). It may just be a question of deciding on the 'abnormal' character of the state of the system (detection) as well as stipulating the kind of anomaly (diagnosis) and, better still, predicting its future change (prognosis) [fr

  8. Revised draft environmental statement related to construction of Atlantic Generating Station Units 1 and 2 (Docket Nos. STN 50-477 and STN 50-478)

    International Nuclear Information System (INIS)

    1976-10-01

    The proposed action is the issuance of a construction permit to Public Service Electric and Gas Company (PDE and G) for the construction of the Atlantic Generating Station (AGS), Units 1 and 2. The AGS is the first nuclear power station in the United States proposed for construction in the offshore waters on the continental shelf. The AHS will be located in the Atlantic Ocean 2.8 miles offshore of Atlantic and Ocean countries. New Jersey, 11 miles northeast of Atlantic City, and will consist of two floating nuclear power plants enclosed in a protective rubble-mound breakwater. Both plants will be identical, of standardized design, and will employ pressurized water reactors to produce up to approximately 3425 megawatts thermal (MWt) each. Steam turbine generators will use this heat to produce up to approximately 1150 megawatts of electrical power (MWe) per unit. The main condensers will be cooled by the flow of seawater drawn from within the breakwater and discharged shoreward and external to the breakwater. This statement identifies various environmental aspects and potential adverse effects associated with the construction and operation of the AGS. Based upon an approximate two-year review period which included a multidisciplined assessment of extensive survey and modeling data, these effects are considered by the staff to be of a generally acceptable nature. Breakwater construction will result in the destruction of 100 acres of benthic infauna (burrowing animals) and the development of a reef-type community on the breakwater. The production of new biomass (standing crop) by the reef community is expected to compensate for the infaunal biomass destroyed by dredging and will contribute mainly to the local sport fishery. 93 figs., 110 tabs

  9. A comprehensive dwelling unit choice model accommodating psychological constructs within a search strategy for consideration set formation.

    Science.gov (United States)

    2015-12-01

    This study adopts a dwelling unit level of analysis and considers a probabilistic choice set generation approach for residential choice modeling. In doing so, we accommodate the fact that housing choices involve both characteristics of the dwelling u...

  10. Design and construction of coal/biomass to liquids (CBTL) process development unit (PDU) at the University of Kentucky Center for Applied Energy Research (CAER)

    Energy Technology Data Exchange (ETDEWEB)

    Placido, Andrew [Univ. of Kentucky, Lexington, KY (United States); Liu, Kunlei [Univ. of Kentucky, Lexington, KY (United States); Challman, Don [Univ. of Kentucky, Lexington, KY (United States); Andrews, Rodney [Univ. of Kentucky, Lexington, KY (United States); Jacques, David [Univ. of Kentucky, Lexington, KY (United States)

    2015-10-30

    This report describes a first phase of a project to design, construct and commission an integrated coal/biomass-to-liquids facility at a capacity of 1 bbl. /day at the University of Kentucky Center for Applied Energy Research (UK-CAER) – specifically for construction of the building and upstream process units for feed handling, gasification, and gas cleaning, conditioning and compression. The deliverables from the operation of this pilot plant [when fully equipped with the downstream process units] will be firstly the liquid FT products and finished fuels which are of interest to UK-CAER’s academic, government and industrial research partners. The facility will produce research quantities of FT liquids and finished fuels for subsequent Fuel Quality Testing, Performance and Acceptability. Moreover, the facility is expected to be employed for a range of research and investigations related to: Feed Preparation, Characteristics and Quality; Coal and Biomass Gasification; Gas Clean-up/ Conditioning; Gas Conversion by FT Synthesis; Product Work-up and Refining; Systems Analysis and Integration; and Scale-up and Demonstration. Environmental Considerations - particularly how to manage and reduce carbon dioxide emissions from CBTL facilities and from use of the fuels - will be a primary research objectives. Such a facility has required significant lead time for environmental review, architectural/building construction, and EPC services. UK, with DOE support, has advanced the facility in several important ways. These include: a formal EA/FONSI, and permits and approvals; construction of a building; selection of a range of technologies and vendors; and completion of the upstream process units. The results of this project are the FEED and detailed engineering studies, the alternate configurations and the as-built plant - its equipment and capabilities for future research and demonstration and its adaptability for re-purposing to meet other needs. These are described in

  11. Worldwide construction

    International Nuclear Information System (INIS)

    Williamson, M.

    1994-01-01

    The paper lists major construction projects in worldwide processing and pipelining, showing capacities, contractors, estimated costs, and time of construction. The lists are divided into refineries, petrochemical plants, sulfur recovery units, gas processing plants, pipelines, and related fuel facilities. This last classification includes cogeneration plants, coal liquefaction and gasification plants, biomass power plants, geothermal power plants, integrated coal gasification combined-cycle power plants, and a coal briquetting plant

  12. Guidelines on constructing funnel plots for quality indicators: A case study on mortality in intensive care unit patients.

    Science.gov (United States)

    Verburg, Ilona Wm; Holman, Rebecca; Peek, Niels; Abu-Hanna, Ameen; de Keizer, Nicolette F

    2017-01-01

    Funnel plots are graphical tools to assess and compare clinical performance of a group of care professionals or care institutions on a quality indicator against a benchmark. Incorrect construction of funnel plots may lead to erroneous assessment and incorrect decisions potentially with severe consequences. We provide workflow-based guidance for data analysts on constructing funnel plots for the evaluation of binary quality indicators, expressed as proportions, risk-adjusted rates or standardised rates. Our guidelines assume the following steps: (1) defining policy level input; (2) checking the quality of models used for case-mix correction; (3) examining whether the number of observations per hospital is sufficient; (4) testing for overdispersion of the values of the quality indicator; (5) testing whether the values of quality indicators are associated with institutional characteristics; and (6) specifying how the funnel plot should be constructed. We illustrate our guidelines using data from the Dutch National Intensive Care Evaluation registry. We expect that our guidelines will be useful to data analysts preparing funnel plots and to registries, or other organisations publishing quality indicators. This is particularly true if these people and organisations wish to use standard operating procedures when constructing funnel plots, perhaps to comply with the demands of certification.

  13. Guidelines on constructing funnel plots for quality indicators: A case study on mortality in intensive care unit patients

    NARCIS (Netherlands)

    Verburg, Ilona W. M.; Holman, Rebecca; Peek, Niels; Abu-Hanna, Ameen; de Keizer, Nicolette F.

    2017-01-01

    Funnel plots are graphical tools to assess and compare clinical performance of a group of care professionals or care institutions on a quality indicator against a benchmark. Incorrect construction of funnel plots may lead to erroneous assessment and incorrect decisions potentially with severe

  14. Challenging Representations: Constructing the Adult Literacy Learner over 30 Years of Policy and Practice in the United Kingdom

    Science.gov (United States)

    Hamilton, Mary; Pitt, Kathy

    2011-01-01

    This article addresses the question, How do changes in policy discourses shape public representations of literacy learners and the goals of adult literacy education? It examines specifically how the agency of adult literacy learners is constructed. We carry out a critical discourse analysis of two key adult literacy policy documents from the U.K.:…

  15. Draft environmental statement related to construction of Erie Nuclear Plant, Units 1 and 2: (Docket Nos. STN 50-580 and STN 50-581)

    International Nuclear Information System (INIS)

    1977-11-01

    The proposed action is the issuance of construction permits to the Ohio Edison Company, acting on behalf of itself, the Cleveland Electric Illuminating Company, Duquesne Light Company, Pennsylvania Power Company, and the Toledo Edison Company, for the construction of the Erie Nuclear Plant Units 1 and 2, located in Erie County, Ohio. A total of 704 hectares (ha) (1740 acres) will be used for the Erie plant site. Construction-related activities on the primary site will disturb about 223 ha (551 acres). Approximately 641 ha (1584 acres) will be required for transmission line rights-of-way. The 3.86-km (2.4-mile) intake and discharge pipeline land corridor will involve alteration of approximately 13 ha (32 acres) of corridor and 1 ha (2.5 acres) for shore facilities. Also, 3.9 ha (9.6 acres) of lake bottom will be disturbed to provide 15-m-wide (50-ft-wide) trenches and an additional 15-m-wide (50-ft-wide) area for storage of excavated material for subsequent backfill for the 701-m (2300-ft) intake and 579-m (1900-ft) discharge lines. Plant construction will involve some community impacts. No residents will be displaced from the site property. Traffic on local roads will increase due to construction and commuting activities. The influx of construction workers' families (a peak work force of about 2700) is expected to cause no major housing or school problems. It is assumed that aquatic organisms entrained in the circulating water system will be killed due to thermal and mechanical shock. The maximum impact based on the population densities of phytoplankton and zooplankton organisms in the adjacent lake area will be the destruction of 0.1% of the entrainable organisms from the lake water. The entrainment of fish larvae will not constitute a significant impact on the lake fishery. 62 figs., 32 tabs

  16. Finding of No Significant Impact: Construction, Operation, and Maintenance of a Solar Array United States Air Force Academy, Colorado

    Science.gov (United States)

    2010-04-21

    8 feet wide by 1 0 feet long by 8 feet high would be on-site to store communications equipment. Switchgear , used in association with the electric...United States Air Force Academy Brian Bush , Judge Advocate Environmental Attorney Jennifer McCorkle, Environmental Planner Russell Hume

  17. Problems in the Construction of Gender and Professional Identities for Women in a United Kingdom Merchant Navy Training School

    Science.gov (United States)

    Walker, Caroline; Peart, David; Gleaves, Alan

    2003-01-01

    The United Kingdom Merchant Navy has a very poor record on access and training for females in terms of marine careers across all levels. Furthermore, it is a world where equity and equality are often simply overlooked, partly because the difficult and harsh realities of "normal" working conditions effectively marginalise both women and…

  18. Redefining Competition Constructively: The Challenges of Privatisation, Competition and Market-Based State Policy in the United States

    Science.gov (United States)

    Eckel, Peter D.

    2007-01-01

    In the United States, the relationship between state governments and public colleges and universities is being redefined with new notions of autonomy and accountability, and with funding policies that are highly market-driven (often referred to as "privatisation") as the centrepieces. Situations and institutional strategies unthinkable…

  19. Performance and behaviour of planted and unplanted units of a horizontal subsurface flow constructed wetland system treating municipal effluent from a UASB reactor.

    Science.gov (United States)

    da Costa, Jocilene Ferreira; de Paoli, André Cordeiro; Seidl, Martin; von Sperling, Marcos

    2013-01-01

    A system composed of two horizontal subsurface flow constructed wetlands operating in parallel was evaluated for the post-treatment of UASB (upflow anaerobic sludge blanket) reactor effluent, for a population equivalent of 50 inhabitants per unit. One unit was planted with cattail (Typha latifolia) and the other was unplanted. The study was undertaken over a period of 4 years, comprising monitoring of influent and effluent constituents together with a full characterization of the behaviour of the units (tracer studies, mathematical modelling of chemical oxygen demand (COD) decay, characterization of solids in the filter medium). The mean value of the surface hydraulic load was 0.11 m(3)m(-2)d(-1), and the theoretical hydraulic retention time was 1.1 d in each unit. Using tracer tests with (82)Br, dispersion number (d) values of 0.084 and 0.079 for the planted and unplanted units were obtained, indicating low to moderate dispersion. The final effluent had excellent quality in terms of organic matter and suspended solids, but the system showed low capacity for nitrogen removal. Four-year mean effluent concentration values from the planted and unplanted units were, respectively: biochemical oxygen demand (BOD(5)): 25 and 23 mg L(-1); COD: 50 and 55 mg L(-1); total suspended solids (TSS): 9 and 9 mg L(-1); N-ammonia: 27 and 28 mg L(-1). The COD decay coefficient K for the traditional plug-flow model was 0.81 and 0.84 d(-1) for the planted and unplanted units. Around 80% of the total solids present in the filter medium were inorganic, and most of them were present in the interstices rather than attached to the support medium. As an overall conclusion, horizontal subsurface flow wetlands can be a very suitable post-treatment method for municipal effluents from anaerobic reactors.

  20. Final environmental statement related to construction of Midland Plant, Units 1 and 2 (Docket Nos. 50-329 and 50-330)

    International Nuclear Information System (INIS)

    1977-01-01

    This is a Final Detailed Statement on Environmental Considerations associated with construction and operation of Midland Plant Units 1 and 2 at Midland, Michigan, pursuant to a construction permit and operating license which has been applied for by the Consumers Power Company. The application is under review by the US Atomic Energy Commission's Regulatory Staff. The environmental impact, including adverse and beneficial effects, of the Midland Plant includes reassignment of use of about 1100 acres of agricultural and residential land for the cooling pond (the plant buildings are located on industrial zoned land); this resulted in the dislocation of approximately 25 residences and relocation of the Midland County Farm to a newly built structure; the destruction of a maximum of 4400 tons of phytoplankton per year at the intake of makeup water from the Tittabawassee River; and a predicted small increase in fogging effects in the near vicinity of the cooling pond. 34 refs., 19 figs., 26 tabs

  1. General review of diagnostic systems in EDF PWR units

    International Nuclear Information System (INIS)

    Chevalier, R.; Brasseur, S.; Ricard, B.

    1998-01-01

    Since the beginning of the French nuclear program, Electricite de France (EDF) has looked for ways to improve the availability and safety of its nuclear units. Therefore, monitoring systems on turbogenerators, reactor coolant pumps, primary circuits and core internal structures were designed by the Research and Development Division and implemented with technologies available during the 1970's. However, mainly because of difficulties for data interpretation by plant personnel, EDF subsequently decided to design and develop different tools to help plant operators to process a diagnosis: - a new generation of the Monitoring and Diagnostic System called PSAD, - expert systems for diagnosis on reactor coolant pumps (RCP) 'DIAPO' and turbogenerator units (TG) 'DIVA', - diagnostic guides written for most equipment pending the installation of new monitoring and diagnosis systems. The first version of PSAD, installed in five units, performs on-line monitoring of the turbogenerator shaft line, steam inlet valves, the reactor coolant pumps and the generator stator. The second version not yet implemented, will include Loose Part Detection (LPD) and Core Internal Structure Monitoring (CISM). The level of diagnosis achieved by PSAD depends on the component monitored. The TG and RCP monitoring functions of PSAD compute high level diagnosis descriptors such as natural frequencies and long term trends but do not elaborate a diagnosis automatically. However, a diagnostic assistance window is available on-line, whenever a warning message is displayed, whether for immediate or later action. The window presents a diagnostic approach whose purpose is to find the causes of the symptoms observed. This diagnosis approach is automated in the DIVA and DIAPO expert systems. Numerous potential faults can be identified for both systems thanks to a hierarchy of abnormal situations. The user interactively answers questions when information is needed to progress in the diagnosis. The resulting

  2. Construction history and construction management

    International Nuclear Information System (INIS)

    Agh, S.

    1999-01-01

    The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)

  3. Safety evaluation report related to the construction of Skagit/Hanford Nuclear Project, Units 1 and 2. Docket Nos. STN 50-522 and 50-523

    International Nuclear Information System (INIS)

    1982-12-01

    Supplement 3 to the Safety Evaluation Report for the application filed by Puget Sound Power and Light Company on behalf of itself, the Pacific Power and Light Company, The Washington Water Power Company, and the Portland General Electric Company for construction permits to build the Skagit/Hanford Nuclear Project has been issued by the Office of Nuclear Reactor Regulation of the United States Nuclear Regulatory Commission. This supplement is an evaluation of the site relocation amendment to the Preliminary Safety Analysis Report. The proposed site has been relocated from Skagit County, Washington, to the Department of Energy's Hanford Reservation

  4. Ensuring radiation safety during construction of the facility ''Ukrytie'' and restoration of unit 3 of the Chernobyl nuclear power station

    International Nuclear Information System (INIS)

    Belovodsky, L.F.; Panfilov, A.P.

    1997-01-01

    On April 26, 1986, an accident at the fourth power unit of the Chernobyl NPS (ChNPS) destroyed the reactor core and part of the power unit building, whereby sizeable amounts of radioactive materials, stored in reactor at operation, were released into the environment, and there were also highly active fragments of fuel elements and pieces of graphite from reactor spread on ChNPS site near to safety block. Information on the accident at ChNPS, including its cause and consequences, was considered at special meeting, conducted by IAEA on August 25-29, 1986, in Vienna. In final report of International Advisory Group for Nuclear Safety (IAGNS), prepared by results of meeting activities, the main stages of the accident effects elimination (AEE) immediately on the station site according to the data, received before August 1, 1986, were discussed. In 1987-1990 the published materials on the later period of AEE, completed by building ''Ukrytie'' installation at the fourth power unit of ChNPS

  5. Construction safety

    CERN Document Server

    Li, Rita Yi Man

    2013-01-01

    A close-to-ideal blend of suburb and city, speedy construction of towers of Babylon, the sparkling proportion of glass and steel buildings’ facade at night showcase the wisdom of humans. They also witness the footsteps, sweats and tears of architects and engineers. Unfortunately, these signatures of human civilizations are swathed in towering figures of construction accidents. Fretting about these on sites, different countries adopt different measures on sites. This book firstly sketches the construction accidents on sites, followed by a review on safety measures in some of the developing countries such as Bermuda, Egypt, Kuwait and China; as well as developed countries, for example, the United States, France and Singapore. It also highlights the enormous compensation costs with the courts’ experiences in the United Kingdom and Hong Kong.

  6. Airship construction

    Science.gov (United States)

    Roda, J.

    1975-01-01

    Forty-four years ago the first successful metal airship was completed and delivered to the United States Navy, the ZMC-2. Between those years and the present, very little effort or serious consideration has been given to the manufacture, design, construction, or economic impact of airships. It is important to retain and exploit the small but continually diminishing pool of airship talent that will expedite the success of the United States in what is now a pioneering venture. The relative simplicity of airship construction, utilizing the tremendous technical advances of the last 44 years, leads to the conclusion that this form of transportation holds great promise for reducing costs of military missions and improving the international competitive position of the United States in commercial applications.

  7. Genetic Bio-Ancestry and Social Construction of Racial Classification in Social Surveys in the Contemporary United States

    Science.gov (United States)

    Guo, Guang; Fu, Yilan; Lee, Hedwig; Cai, Tianji; Harris, Kathleen Mullan; Li, Yi

    2013-01-01

    Self-reported race is generally considered the basis for racial classification in social surveys, including the U.S. census. Drawing on recent advances in human molecular genetics and social science perspectives of socially constructed race, our study takes into account both genetic bio-ancestry and social context in understanding racial classification. This article accomplishes two objectives. First, our research establishes geographic genetic bio-ancestry as a component of racial classification. Second, it shows how social forces trump biology in racial classification and/or how social context interacts with bio-ancestry in shaping racial classification. The findings were replicated in two racially and ethnically diverse data sets: the College Roommate Study (N = 2,065) and the National Longitudinal Study of Adolescent Health (N = 2,281). PMID:24019100

  8. Analysis of the accident in the second power-generating unit of the Chernobyl nuclear power plant caused by inadequate makeup of the reactor cooling loop

    International Nuclear Information System (INIS)

    Vasil'chenko, V.N.; Kramerov, A.Ya.; Mikhailov, D.A.

    1995-01-01

    The accident in the second power-generating unit of the Chernobyl nuclear power plant on October 11, 1991 was the result of unauthorized connection of the TG-4 turbogenerator, which was shut down for repairs, into the grid (in the off-design asynchronous engine mode), and this resulted in a serious fire in the machine room and subsequent failure of systems which are important for safety and which ensure the design mode of reactor cooling: These were primarily failures of the feed and emergency feed pumps and failure of the BRU-B control valve, which regulates steam release during cooling

  9. Football et unité nationale : entre construction politique et signification sociale (1965–2010

    Directory of Open Access Journals (Sweden)

    Nassir Abdoun

    2016-01-01

    Full Text Available Au Cameroun, pays d'Afrique centrale qui compte plus de 200 langues nationales et entités ethniques, le football s'est imposé tant dans le discours politique que dans la praxis sociale comme un instrument de l'unité nationale. Sport le plus important au regard du palmarès et de l'engouement populaire, le football est un reflet pertinent de la dynamique historique qui s'opère dans ce pays. A l'image des clubs mythiques à base ethno-centrée qui ont animé la scène sportive du continent dans les décennies des années 60 et 70, la société semble s'attacher au marquage identitaire propre à ces associations sportives. C'est avec l'émergence du label « Lions indomptables » que nous assistons à un véritable mixage à l'échelle nationale. Dans une approche dynamique, il s'agit de déterminer les fondements de cette unité rendue opérationnelle par le football. L'approche est éminemment pluridisciplinaire en usant de l'histoire, de la science politique et de la sociologie.

  10. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2002-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 425, Area 9 Main Lake Construction Debris Disposal Area. This CAU is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996). This site will be cleaned up under the SAFER process since the volume of waste exceeds the 23 cubic meters (m{sup 3}) (30 cubic yards [yd{sup 3}]) limit established for housekeeping sites. CAU 425 is located on the Tonopah Test Range (TTR) and consists of one Corrective Action Site (CAS) 09-08-001-TA09, Construction Debris Disposal Area (Figure 1). CAS 09-08-001-TA09 is an area that was used to collect debris from various projects in and around Area 9. The site is located approximately 81 meters (m) (265 feet [ft]) north of Edwards Freeway northeast of Main Lake on the TTR. The site is composed of concrete slabs with metal infrastructure, metal rebar, wooden telephone poles, and concrete rubble from the Hard Target and early Tornado Rocket sled tests. Other items such as wood scraps, plastic pipes, soil, and miscellaneous nonhazardous items have also been identified in the debris pile. It is estimated that this site contains approximately 2280 m{sup 3} (3000 yd{sup 3}) of construction-related debris.

  11. Evaluation of a hybrid constructed wetland for treating domestic sewage from individual housing units surrounding agricultural villages in South Korea.

    Science.gov (United States)

    Seo, Dong Cheol; DeLaune, Ronald D; Park, Woo Young; Lim, Jong Sir; Seo, Jeoung Yoon; Lee, Do Jin; Cho, Ju Sik; Heo, Jong Soo

    2009-01-01

    The treatment efficiency of 2- and 3-stage constructed wetlands (CWs) was evaluated for treating domestic sewage from houses surrounding agricultural villages. The optimum depth of filter media was 90 cm. The optimum volume ratio of vertical flow (VF) and horizontal flow (HF) beds was 1:2, and the optimum filter medium was broken stone in the VF-HF 2-stage hybrid CWs. Based on the above optimum conditions, removal efficiency of biochemical oxygen demand (BOD), chemical oxygen demand (COD), suspended solids (SS), total nitrogen (T-N), and total phosphorus (T-P) were 99, 98, 99, 68, and 72%, respectively. However to utilize constructed wetlands (CWs) for treating domestic sewage for an individual house, would require downsizing of the 2-stage hybrid CWs. In addition, the low removal efficiency of T-N and T-P in 2-stage hybrid CWs would require improvements necessary to meet acceptable water quality discharge standards. Thus, to reduce the CWs' area and improve the T-N and T-P removal efficiencies, VF-HF 2-stage hybrid CW was modified into VF/HF(I)-HF(II) and VF/HF(I)-HF(III) 3-stage hybrid CW. The optimum reduced size of 3-stage hybrid CW was the VF/HF(I)-HF(II) configuration which also increased T-N removal. Using this system, removal efficiency of BOD, COD, SS, T-N, and T-P were 99, 98, 99, 83, and 75%, respectively. In VF/HF(I)-HF(II) CW, the removal velocity of BOD, COD and SS was rapid on the order of VF (1st stage) > HF(II) (3rd stage) > or = HF(I) (2nd stage), VF (1st stage) > HF(II) (3rd stage) > HF(I) (2nd stage) and VF (1st stage) > HF(I) (2nd stage) > HF(II) (3rd stage), respectively. The removal velocity of T-N and T-P in VF/HF(I)-HF(II) CWs was rapid on the order of HF(I) (2nd stage) > HF(II) (3rd stage) > or = VF (1st stage) and VF (1st stage) > HF(I) (2nd stage) > HF(II) (3rd stage), respectively.

  12. Draft environmental statement related to construction of Yellow Creek Nuclear Plant, Units 1 and 2: (Docket Nos. STN 50-566 and STN 50-567)

    International Nuclear Information System (INIS)

    1977-06-01

    The proposed action is the issuance of construction permits to the Tennessee Valley Authority for the construction of the Yellow Creek Nuclear Plant Units 1 and 2. The 470-hectare site is predominantly wooded. Construction-related activities on the site would disturb about 59 hectares. The portion of this land not to be used for plant facilities, parking lots, roads, etc., will be restored by seeding and landscaping. The temporary removal of vegetation will tend to promote erosion. Increased siltation and turbidity can be expected in the Yellow Creek embayment during construction, but measures will be taken to minimize these effects. A maximum of 237.6 m 3 /min of make-up water will be withdrawn from the Yellow Creek embayment, of which 106 m 3 /min will be returned to Pickwick Lake via a pipeline with the dissolved solids concentration increased by a factor of about two. About 106 m 3 /min will be evaporated to the atmosphere by the cooling towers. The volume of thermal discharge (106 m 3 /min) is small compared with the flow in Pickwick Lake (minimum daily average flow of 7812 m 3 /min) and the effect on the Pickwick Lake ecosystem is not expected to be significant. During periods of average flow the plant could use about 24% of the flow through Yellow Creek embayment. Chemical discharges (with the possible exception of copper) from the plant will be diluted to concentrations below those which might adversely affect aquatic biota. The risk associated with accidental radiation exposure will be very low. 42 figs., 100 tabs

  13. Helmet "tang" from the Metropolitan Museum of Art (New York City, United States. Features of Construction, Design and Operational Use

    Directory of Open Access Journals (Sweden)

    Leonid A. Bobrov

    2016-12-01

    Full Text Available The article discusses iron helmet (No. 36.25.115, which is stored in the Metropolitan Museum of art (New York City, United States. For the first time this helmet was published and analyzed by American scientists G. C. Stone and D.G. Alexander. The analysis showed that the Bowl was made by Turkish masters of the XVII century and backplate and the hoop is added to the helmet in 1781–1782 D.G. Alexander speculated that the helmet belonged to the Warrior of the Crimean Khanate. Dating the helmet does not raise objections. However, the attribution of a helmet requires some clarification. Analysis of the design of the helmet and decoration revealed that backplate, hoop and Aventail from iron rings added to Bowl in 1781–1782, were manufactured by Circassian craftsmen living in the Northern Caucasus or in Crimea. For the decoration of the helmet has been used typical Circassian ornaments: "sieve", cherkessian floral pattern, geometric shapes, triangular in shape, "gear", etc. During Assembly of the helmet were applied characteristic of Circassian gunsmiths technological solutions: using as a basis the bowl old-style helmet, tapered Finial with a ring for a decorative plume, hoop with four plates, ringed with aventail lip to protect the forehead, etc. In Circassia similar headgear worn were known as tang (from the Arabic. "Taj", i.e., the "Crown". In the XVII–XVIII centuries. they willingly purchased representatives of Crimean Tatar nobility. Similar in design and system design helmets Circassian production belonged to the highest aristocracy of the Crimean Khanate, are stored in Museum and private collections in Poland, Turkey and the United States. The inscription "Bekmurun" on the hoop from the Metropolitan helmet suggests that it was manufactured on request of Kabardian Bekmur princely heir (Bekmurziny, which moved from Circassia in Crimea, 1737. The popularity of tang type helmets among the aristocracy of North Caucasus and Crimea were due not

  14. Construction of Luminogen Exhibiting Multicolored Emission Switching through Combination of Twisted Conjugation Core and Donor-Acceptor Units

    Directory of Open Access Journals (Sweden)

    Haiyan Tian

    2017-12-01

    Full Text Available Stimuli responsive luminescent materials, especially those exhibiting multicolor emission switching, have potential application in sensor, optical recording, security ink, and anti-counterfeit label. Through combination of twisted conjugation core and donor and acceptor units, a luminogen (2-(bis(4-(carbazol-9-ylphenylmethylenemalononitrile (1 was synthesized. Luminogen 1 can form three kinds of crystals emitting green (1GC, λem = 506 nm, ΦF = 19.8%, yellow-green (1YC, λem = 537 nm, ΦF = 17.8%, and orange (1OC, λem = 585 nm, ΦF = 30.0% light upon 365 nm UV illumination. The emission of amorphous solid of 1 (1Am overlaps with that of 1OC (λem = 585 nm, with quantum yield of 13.9%, which is seldom reported. Emission of 1 can be switched among green, yellow-green, and orange through morphology modulation upon exposure to thermal, solvent vapor, or mechanical stimuli. Finally, its potential application in optical recording was also investigated.

  15. Constructing a Spatially Resolved Methane Emission Inventory of Natural Gas Production and Distribution over Contiguous United States

    Science.gov (United States)

    Li, X.; Omara, M.; Adams, P. J.; Presto, A. A.

    2017-12-01

    Methane is the second most powerful greenhouse gas after Carbon Dioxide. The natural gas production and distribution accounts for 23% of the total anthropogenic methane emissions in the United States. The boost of natural gas production in U.S. in recent years poses a potential concern of increased methane emissions from natural gas production and distribution. The Emission Database for Global Atmospheric Research (Edgar) v4.2 and the EPA Greenhouse Gas Inventory (GHGI) are currently the most commonly used methane emission inventories. However, recent studies suggested that both Edgar v4.2 and the EPA GHGI largely underestimated the methane emission from natural gas production and distribution in U.S. constrained by both ground and satellite measurements. In this work, we built a gridded (0.1° Latitude ×0.1° Longitude) methane emission inventory of natural gas production and distribution over the contiguous U.S. using emission factors measured by our mobile lab in the Marcellus Shale, the Denver-Julesburg Basin, and the Uintah Basin, and emission factors reported from other recent field studies for other natural gas production regions. The activity data (well location and count) are mostly obtained from the Drillinginfo, the EPA Greenhouse Gas Reporting Program (GHGRP) and the U.S. Energy Information Administration (EIA). Results show that the methane emission from natural gas production and distribution estimated by our inventory is about 20% higher than the EPA GHGI, and in some major natural gas production regions, methane emissions estimated by the EPA GHGI are significantly lower than our inventory. For example, in the Marcellus Shale, our estimated annual methane emission in 2015 is 600 Gg higher than the EPA GHGI. We also ran the GEOS-Chem methane simulation to estimate the methane concentration in the atmosphere with our built inventory, the EPA GHGI and the Edgar v4.2 over the nested North American Domain. These simulation results showed differences in

  16. Final environmental statement related to the proposed construction of Douglas Point Nuclear Generating Station, Units 1 and 2: (Docket Nos. 50-448 and 50-449)

    International Nuclear Information System (INIS)

    1976-03-01

    The proposed action is the issuance of construction permits to the Potomac Electric Power Company for the construction of the Douglas Point Nuclear Generating Station, Units 1 and 2, located in Charles County, Maryland. The exhaust steam will be cooled via a closed-cycle mode incorporating natural-draft wet cooling towers. The water used in the cooling system will be obtained from the Potomac River. Construction-related activities on the site will convert about 290 acres of the 1390 acres of forested land at the Douglas Point site to industrial use. In addition to acreage at the site, approximately 4.5 miles of transmission corridor will require about 211 acres of land for rights-of-way. This corridor will connect with 27 miles of existing rights-of-way over which a line connecting Possum Point to Burches Hill has already been approved. The installation of new transmission line, uniquely identified with Douglas Point, along the existing right-of-way will involve approximately 464 additional acres. As described in the application, the maximum river water intake will be about 97,200 gpm. Of this, a maximum of about 28,000 gpm will be lost in drift or evaporation from the cooling towers. About 700 gpm maximum of fresh well water will be consumed. It is conservatively assumed that all aquatic organisms entrained in the service water system will be killed due to thermal and mechanical shock. It is further estimated that at 97,200 gpm maximum total river water intake, the maximum impact on the striped bass fishery will be a reduction of <5%. The risk associated with accidental radiation exposure is very low. 32 figs., 59 tabs

  17. End of the Swatchmobil. Swiss engineer constructs the world`s smallest cogeneration unit; Abschied vom Swatchmobil. Ein Schweizer entwickelte das kleinste Blockheizkraftwerk der Welt

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1998-01-01

    Daniel Ryhiner, car construction engineer, intended to develop a hybrid drive for the Hayek Swatch-Mobil (Smart). Instead, he ended up with a miniature-sized cogeneration unit for single-family and two-family dwellings and small commercial enterprises. The cogeneration unit is operated with variable speed in order to adapt electricity and heat generation to demand variations. A current inverter connected between the generator and network ensures maintenance of the network frequency of 50 Hz independent of rotational speed and generator voltage. (orig./GL) [Deutsch] Als Automobilingenieur sollte Daniel Ryhiner einen Hybridantrieb fuer Hayeks Swatch-Mobil (Smart) entwickeln. Daraus wurde ein Mini-Blockheizkraftwerk fuer Ein- und Zweifamilienhaeuser und kleine Gewerbebetriebe. Dabei erwies sich die Idee, das Mini-BHKW drehzahlvariabel auszulegen, um so dessen Strom- oder Waermeabgabe dem wechselnden Bedarf anpassen zu koennen, als genial. Eine zwischen den Generator und das Stromnetz geschaltete Wechselrichterelektronik sorgt dafuer, dass unabhaengig von der Drehzahl und der Generatorspannung die Netzfrequenz von 50 Hertz erzeugt wird. (orig./GL)

  18. 1998 Construction Report.

    Science.gov (United States)

    Abramson, Paul

    1998-01-01

    Reports on the third annual survey of college and university construction in the United States. Finds that almost $5.8 billion worth of construction was completed in 1997, and $6.3 billion will be finished in 1998. Offers information on regional construction activity, profiles of new buildings on campuses, residence hall amenities, and other data.…

  19. Narrative constructions of sexual violence as told by female rape survivors in three populations of the southwestern United States: scripts of coercion, scripts of consent.

    Science.gov (United States)

    Bletzer, Keith V; Koss, Mary P

    2004-01-01

    There is a growing literature on the narrative construction of rape as sexual violence. This is puzzling, since, in certain contexts, violence may stifle narrative production. Researchers of atrocities, for example, propose that the experience of recurring terror disrupts narrative cohesion in reporting lived trauma. Genocidal horror occurs in the context of communities and ethnic groups. Our rape survival data from women of three populations in the southwestern United States reflect traumas of sexual violence against women, experienced within everyday lives. From interviews with 62 female rape survivors, we (1) identify narrative conventions and linguistic devices to show how these women structure accounts of sexual assault that reflect their cultural background; (2) contrast scripts of coercion and consent; (3) examine how the way in which these women describe the coercive actions of the perpetrator(s) contradicts the assumptions of legal discourse; and (4) discuss the narrative production of several women in abusive relationships and compare it to the narrative production (or lack thereof) of persons who experience state-engineered terror.

  20. Stand-by units. Guideline for projecting, construction and operation. 4. rev. ed.; Notstromaggregate. Richtlinie fuer Planung, Errichtung und Betrieb von Anlagen mit Notstromaggregaten

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The guideline applies to systems with stand-by units for power supply in case of network failures. All legal regulations and relevant DIN standards apply, e.g. DIN 6280 (especially part 13), DIN-VDE standards like DIN VDE 0100 (especially part 551), DIN VDE 0107, DIN VDE 0108, and the construction regulations of the federal states as well as the Federal Nuisance Protection Act (BImSchG). [German] Diese Richtlinie gilt fuer Anlagen mit Notstromaggregaten, die ausschliesslich der Sicherstellung des Elektrizitaetsbedarfs bei Aussetzen der oeffentlichen Versorgung dienen (Paragraph 3 Abs. 1 der 'Verordnung ueber Allgemeine Bedingungen fuer die Elektrizitaetsversorgung von Tarifkunden' (AVBEltV) und Abschnitt 13 TAB 2000). Alle einschlaegigen behoerdlichen Vorschriften und sonstigen Bestimmungen sind zu beachten, auch wenn sie hier nicht vollstaendig aufgefuehrt sind, z.B. DIN-Normen, wie DIN 6280 (insbesondere Teil 13), DIN-VDE-Normen, wie DIN VDE 0100 (insbesondere Teil 551), DIN VDE 0107, DIN VDE 0108, Bauordnungen der Laender, Bundes-Immissionsschutzgesetz. (orig.)

  1. A Point Source of a Different Color: Identifying a Gap in United States Regulatory Policy for “Green” CSO Treatment Using Constructed Wetlands

    Directory of Open Access Journals (Sweden)

    Zeno F. Levy

    2014-04-01

    Full Text Available Up to 850 billion gallons of untreated combined sewer overflow (CSO is discharged into waters of the United States each year. Recent changes in CSO management policy support green infrastructure (GI technologies as “front of the pipe” approaches to discharge mitigation by detention/reduction of urban stormwater runoff. Constructed wetlands for CSO treatment have been considered among suites of GI solutions. However, these wetlands differ fundamentally from other GI technologies in that they are “end of the pipe” treatment systems that discharge from a point source, and are therefore regulated in the U.S. under the National Pollution Discharge Elimination System (NPDES. We use a comparative regulatory analysis to examine the U.S. policy framework for CSO treatment wetlands. We find in all cases that permitting authorities have used best professional judgment to determine effluent limits and compliance monitoring requirements, referencing technology and water quality-based standards originally developed for traditional “grey” treatment systems. A qualitative comparison with Europe shows less stringent regulatory requirements, perhaps due to institutionalized design parameters. We recommend that permitting authorities develop technical guidance documents for evaluation of “green” CSO treatment systems that account for their unique operational concerns and benefits with respect to sustainable development.

  2. Sustainable advanced construction technologies

    CSIR Research Space (South Africa)

    Kuchena, JC

    2009-11-01

    Full Text Available Materials (ECOMAT IV 2009): Paths Towards Sustainability Bayamo, CUBA 4 coupled with unimaginative and ill-directed policies by developers have created hectares of sterile concrete block units unaffordable to the average worker.” [10] Advanced construction... Gypsum panel boards Standards / Easy, fast construction 2. Frametech Concrete / Wire Mesh (durawall) Standards / Easy, fast construction 3. Frametech Wood panels Standards / Easy, fast construction 4. Wood Cabins Wood planks / boards Standards...

  3. Evaluating the Effect from Constructing Binary Geothermal Power Units Based on Spent Petroleum and Gas Boreholes in the South Regions of Russia

    Science.gov (United States)

    Alkhasov, A. B.; Alkhasova, D. A.

    2018-02-01

    The article substantiates the possibility of efficiently harnessing the geothermal resources available in the North Caucasian region through constructing binary geothermal power plants (GeoTPPs) using idle petroleum and gas wells. The power capacities of GeoTPPs are evaluated, and the basic characteristics of these power plants in case of constructing them in the promising areas are determined. The overall useful GeoTPP capacity equal to approximately 330 MW can be obtained from using the entire fleet of idle wells available in these areas. Diagrams confirming the possibility of reaching the optimal flowrate of geothermal heat carrier circulating in the geothermal circulation system loop are presented. This flowrate corresponds to a binary GeoTPP's maximal useful power output. The article shows, taking the Ternair geothermal field as an example, that it is inefficient to use medium-enthalpy thermal waters for generating energy at a binary GeoTPP involving reinjection of a spent heat carrier. It is shown that good prospects can be expected from applying a hybrid geothermal and combined-cycle technology, by means of which it is possible to use lowenthalpy (80-100°C) thermal waters for generating electricity in a highly efficient manner. In accordance with such technology, geothermal heat is used in the binary GeoTPP cycle for heating low-boiling working fluid to its evaporation temperature. The working fluid is evaporated and superheated by using the heat of exhaust gases from a gas turbine power unit. Owing to combined use of the thermal water heat potential and the heat of exhaust gases from a gas turbine power plant in a hybrid process system, it becomes possible to obtain high power performance indicators of hybrid geothermal and combined-cycle power plants. This conclusion is confirmed by the results from numerical evaluations carried out as applied to the Ternair geothermal field. With the fully harnessed resource potential of the Ternair field, the total

  4. 10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. Construction package No. 10 (RADL Item 7-34) field erected tanks. Part I. Thermal storage unit (TUS)

    Energy Technology Data Exchange (ETDEWEB)

    1980-03-01

    The final design, fabrication and erection of two different tanks upon foundations are given. Technical specifications and supplemental construction drawings are included for both the thermal storage unit and the plant support system caloria makeup tank for use at the 10 MWe Solar Thermal Central Receiver Pilot Plnat. (LEW)

  5. Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects

    Directory of Open Access Journals (Sweden)

    Lapidus Azary

    2018-01-01

    Full Text Available Development of efficient algorithms for designing future operations is a vital element in construction business. This paper studies various aspects of a methodology required to determine the integration index for construction crews performing various process-related jobs. The main objective of the study outlined in this paper is to define the notion of integration in respect to a construction crew that performs complete cycles of construction and assembly works in order to find the optimal organizational solutions, using the integrated crew algorithm built specifically for that purpose. As seen in the sequence of algorithm elements, it was designed to focus on the key factors affecting the level of integration of a construction crew depending on the value of each of those elements. The multifactor modelling approach is used to assess the KPI of integrated construction crews involved in large-sale high-rise construction projects. The purpose of this study is to develop a theoretical recommendation and a scientific methodological provision of organizational and technological nature to ensure qualitative formation of integrated construction crews to increase their productivity during integrated implementation of multi-task construction phases. The key difference of the proposed solution from the already existing ones is that it requires identification of the degree of impact of each factor, including the change in the qualification level, on the integration index of each separate element in the organizational and technological system in construction (integrated construction crew.

  6. Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects

    Science.gov (United States)

    Lapidus, Azary; Abramov, Ivan

    2018-03-01

    Development of efficient algorithms for designing future operations is a vital element in construction business. This paper studies various aspects of a methodology required to determine the integration index for construction crews performing various process-related jobs. The main objective of the study outlined in this paper is to define the notion of integration in respect to a construction crew that performs complete cycles of construction and assembly works in order to find the optimal organizational solutions, using the integrated crew algorithm built specifically for that purpose. As seen in the sequence of algorithm elements, it was designed to focus on the key factors affecting the level of integration of a construction crew depending on the value of each of those elements. The multifactor modelling approach is used to assess the KPI of integrated construction crews involved in large-sale high-rise construction projects. The purpose of this study is to develop a theoretical recommendation and a scientific methodological provision of organizational and technological nature to ensure qualitative formation of integrated construction crews to increase their productivity during integrated implementation of multi-task construction phases. The key difference of the proposed solution from the already existing ones is that it requires identification of the degree of impact of each factor, including the change in the qualification level, on the integration index of each separate element in the organizational and technological system in construction (integrated construction crew).

  7. [A survey of present situation of general intensive care unit in second grade hospitals and construction of intensive care network in Guangdong province].

    Science.gov (United States)

    Guo, Qi; Li, Yi-min; Qin, Tie-he; Wu, Heng-yi; Guan, Xiang-dong; Xu, Yuan-da; Jiang, Mei; Xiao, Zheng-lun

    2007-10-01

    To investigate the present situation of general intensive care unit (ICU) in second grade hospitals, and to establish intensive care network for the Department of Public Health of Guangdong province in Guangdong province. Data from ICU of 26 hospitals in Guangdong were collected through questionnaire concerning different aspects of critical care medicine. (1) ICU size was (10.12+/-3.82) beds per unit, ratios of doctors to beds and nurses to beds were 0.73+/-0.25 and 1.80+/-0.57 respectively, and proportions of closed model or semi-closed model of ICU management were 69.2% and 26.9% respectively. (2) Area occupied by per bed was (17.57+/-7.58) m2, ratio of basins with infrared control facet to beds was 0.47+/-0.33, proportions of ICU equipped with room equipped with positive or negative air pressure, laminar flow, or with room for preparing nutrition support were 15.4%, 30.8%, and 23.1% respectively. (3) All the ICU were capable of institution and management of artificial airway, mechanical ventilation, placement of deep vein line, cardioversion and defibrillation, parenteral nutrition, and sedation. Ninety-six point two percent of the ICU could accomplish trachea intubation independently. Fifty-three point eight percent of the ICU could perform hemodynamic monitoring. Continuous blood purification could be done in 73.1 % of the ICU. (4) Ninety-six point two percent of the ICU were equipped with continuous bedside multifunctional electrocardiogram monitor and ratio of the monitors to beds was 0.89+/-0.29. Ratios of resuscitation air bags to beds and ventilators to beds were 0.71+/-0.34 and 0.71+/-0.24 respectively. Portable ventilator was equipped in 34.6 % of the ICU. Forty percent of the ICU could not perform non-invasive ventilation, 65.4 % of the ICU were equipped with fiberoptic bronchoscope, blood gas analysis could be done during 24 hours round in 92.3 % of the ICU. (5) Twenty-six ICU investigated were found to be distributed over the district of Zhujiang

  8. Site investigation SFR. Rock type coding, overview geological mapping and identification of rock units and possible deformation zones in drill cores from the construction of SFR

    Energy Technology Data Exchange (ETDEWEB)

    Petersson, Jesper (Vattenfall Power Consultant AB, Stockholm (Sweden)); Curtis, Philip; Bockgaard, Niclas (Golder Associates AB (Sweden)); Mattsson, Haakan (GeoVista AB, Luleaa (Sweden))

    2011-01-15

    This report presents the rock type coding, overview lithological mapping and identification of rock units and possible deformation zones in drill cores from 32 boreholes associated with the construction of SFR. This work can be seen as complementary to single-hole interpretations of other older SFR boreholes earlier reported in /Petersson and Andersson 2010/: KFR04, KFR08, KFR09, KFR13, KFR35, KFR36, KFR54, KFR55, KFR7A, KFR7B and KFR7C. Due to deficiencies in the available material, the necessary activities have deviated somewhat from the established methodologies used during the recent Forsmark site investigations for the final repository for spent nuclear fuel. The aim of the current work has been, wherever possible, to allow the incorporation of all relevant material from older boreholes in the ongoing SFR geological modelling work in spite of the deficiencies. The activities include: - Rock type coding of the original geological mapping according to the nomenclature used during the preceding Forsmark site investigation. As part of the Forsmark site investigation such rock type coding has already been performed on most of the old SFR boreholes if the original geological mapping results were available. This earlier work has been complemented by rock type coding on two further boreholes: KFR01 and KFR02. - Lithological overview mapping, including documentation of (1) rock types, (2) ductile and brittle-ductile deformation and (3) alteration for drill cores from eleven of the boreholes for which no original geological borehole mapping was available (KFR31, KFR32, KFR34, KFR37,KFR38, KFR51, KFR69, KFR70, KFR71, KFR72 and KFR89). - Identification of possible deformation zones and merging of similar rock types into rock units. This follows SKB's established criteria and methodology of the geological Single-hole interpretation (SHI) process wherever possible. Deviations from the standard SHI process are associated with the lack of data, for example BIPS images

  9. Optimal design of compact organic Rankine cycle units for domestic solar applications

    DEFF Research Database (Denmark)

    Barbazza, Luca; Pierobon, Leonardo; Mirandola, Alberto

    2014-01-01

    Organic Rankine cycle turbogenerators are a promising technology to transform the solar radiation harvested by solar collectors into electric power. The present work aims at sizing a small-scale organic Rankine cycle unit by tailoring its design for domestic solar applications. Stringent design...... criteria, i.e., compactness, high performance and safe operation, are targeted by adopting a multi-objective optimization approach modeled with the genetic algorithm. Design-point thermodynamic variables, e.g., evaporating pressure, the working fluid, minimum allowable temperature differences....... Findings also suggest that the evaporator and condenser minimum allowable temperature differences have the largest impact on the system volume and on the cycle performances. Among the fluids considered, the results indicate that R1234yf and R1234ze are the best working fluid candidates. Using flat plate...

  10. Construction Minerals Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes construction minerals operations in the United States. The data represent commodities covered by the Minerals Information Team (MIT) of the...

  11. A Novel 500kW High-Speed Turbine PM Synchronous Generator Set for Distributed Power Generation

    Science.gov (United States)

    Wendt, Sven; Benecke, Frank; Güldner, Henry

    The paper presents a power generation system based on the cogeneration of heat and electricity with a novel high speed turbogenerator. The machine consists of a single stage steam turbine and a directly coupled permanent magnet synchronous generator in one constructional unit. A PWM IGBT rectifier is the load to the generator and a PWM IGBT three-phase four-wire inverter feeds the power into the low voltage mains. In order to increase the turbine efficiency at light load, variable speed operation of the turbogenerator is realized. Different control schemes for mains parallel operation and stand alone operation are presented. The control schemes allow for the use of a lookup table based control with a speed-power-characteristic or for the use of a maximum power point tracker. Measurement results from the successfully tested turbogenerator set are presented.

  12. Constructed Wetlands

    Science.gov (United States)

    these systems can improve water quality, engineers and scientists construct systems that replicate the functions of natural wetlands. Constructed wetlands are treatment systems that use natural processes

  13. State of development of superconducting turbogenerators

    International Nuclear Information System (INIS)

    Intichar, L.

    1995-01-01

    Two projects are reported intended to finally establish the necessary knowledge and results for product development, superconducting generators for power plant applications. One project is a German activity, focusing on two generator design models, and the other is a Japanese project. The project progress achieved in Japan is expected to lead within the next three years to successful completion and to a 70 MW generator demonstrating the feasibility of the technology, and its application to considerably higher power ranges. (orig./MM) [de

  14. Agricultural Construction Volume I. Arc Welding Project Construction. Instructor's Guide.

    Science.gov (United States)

    Brzozowski, Dick; Admire, Myron

    This guide contains instructor's materials for teaching a secondary agricultural construction course consisting of instructional units on arc welding (8 lessons) and project construction (14 lessons). The materials for each unit include student objectives, a list of competencies from which the objectives were derived, suggestions for motivating…

  15. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  16. Design, manufacture and construction of low-cost housing units equipped with solar energy technology in Iraq's marshes and remote areas

    Science.gov (United States)

    Abdulhadi, Usama Abdulmajeed; Alwan, Angham Raad; Sarhan, Hani Hassan; Ali, Majid Hassan; Anjas, Jamal Jameel; Khaleel, Saba Mahdi; Abood, Ban Ali

    2012-09-01

    Samples of Iraq's marshes reed panels were prepared by a new method. Reed samples were coated by polyester and pressed isolating to produce reed panel. Thermal isolation of(0. 13%) was found less than concert (0.9 %). Water absorption resistance effect was achieved and mechanical bending under static load was conducted. Reed panels were used as construction materials.

  17. Final supplement to the final environmental statement related to construction of Palo Verde Nuclear Generating Station Units 1, 2 and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1976-02-01

    The proposed action is the issuance of construction permits to the Arizona Public Service Company for the construction of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. Preparation of the 3800-acre site will involve the clearing of up to 2500 acres of land, 1500 of which will ultimately be developed during the lifetime of the station. About 2200 site acres, previously devoted to agriculture, will be excluded from this land use. Soil disturbance during construction of the station, transmission lines, and water conveyance pipeline will tend to promote erosion and increase siltation local ephemeral water courses. Stringent measures will be taken to minimize these effects (Sec. 4.5). Station, transmission line, and water pipeline construction will kill, remove, displace, or otherwise disturb involved flora and fauna, and will eliminate varying amounts of wildlife breeding, nesting, and forage habitat. These will not be important permanent impacts to the population stability and structure of the involved local ecosystems of the Sonoran desert; however, measures will be taken to minimize such effects as do results from the proposed action. 26 refs., 1 fig., 20 tabs

  18. Final supplement to the final environmental statement related to construction of Skagit Nuclear Power Project, Units 1 and 2: (Docket Nos. STN 50-522 and STN 50-523)

    International Nuclear Information System (INIS)

    1977-04-01

    The proposed action is the issuance of construction permits to the Puget Sound Power and Light Company, Pacific Power and Light Company, Washington Water Power Company and the Portland General Electric Company, for the construction of Skagit Nuclear Power Projects Units 1 and 2 in Skagit County, Washington (about 64 miles north of Seattle and 6 miles ENE of Sedro Woolley). These units are scheduled for commercial service in 1984 and 1986, respectively. The exhaust steam from the turbine-generators will be cooled in condensers which will utilize one hyperbolic-type natural-draft cooling tower per unit to dissipate heat to the atmosphere. Water (106 cfs max.) for the cooling tower makeup (82.4 cfs) and other plant uses will be withdrawn from the Skagit River through Ranney Collectors embedded in the north bank of the river and pumped to the plant through a pipeline about 35,000 ft. long. Cooling tower blowdown (7 cfs max.) from the project and dilution water (20 cfs max.) will flow through a pipeline back to the river where it will be discharged through a diffuser. Approximately 1750 acres of forested and agricultural land will be removed from harvesting for the life of the power plant; 360 acres of this land will be diverted to industrial use. This will affect less than 0.5% of standing forest in Skagit County and 16 acres in cultivated crops and pasturage. Increased siltation of onsite creeks and the Skagit River from construction work and the small amounts of heat and chemicals discharged to the river during plant operation will have insignificant impacts on water quality and aquatic biota due to erosion control efforts and dilution by the large river flow. (16,200 cfs average; 4740 cfs 7-day, 10-yr low). 18 figs

  19. Conducting water chemistry of the secondary coolant circuit of VVER-based nuclear power plant units constructed without using copper containing alloys

    Science.gov (United States)

    Tyapkov, V. F.

    2014-07-01

    The secondary coolant circuit water chemistry with metering amines began to be put in use in Russia in 2005, and all nuclear power plant units equipped with VVER-1000 reactors have been shifted to operate with this water chemistry for the past seven years. Owing to the use of water chemistry with metering amines, the amount of products from corrosion of structural materials entering into the volume of steam generators has been reduced, and the flow-accelerated corrosion rate of pipelines and equipment has been slowed down. The article presents data on conducting water chemistry in nuclear power plant units with VVER-1000 reactors for the secondary coolant system equipment made without using copper-containing alloys. Statistical data are presented on conducting ammonia-morpholine and ammonia-ethanolamine water chemistries in new-generation operating power units with VVER-1000 reactors with an increased level of pH. The values of cooling water leaks in turbine condensers the tube system of which is made of stainless steel or titanium alloy are given.

  20. Construction practice

    International Nuclear Information System (INIS)

    Winters, J.; Clelland, J.; Rumble, E.; Sandell, L.

    2007-01-01

    One has elaborated a virtual computer model (VRC) of construction of the AP1000 project reactor to demonstrate its viability, to improve the NPP project making it more easy for construction with simultaneous reduction of time, costs and risk of construction. The approach ensured time sequence of the 3-D visualization of NPP at the construction stages. The VRC ensures optimization of scheme implementation time period and specifies the basic costs. The VRC application offers essential advantages when planning construction of a nuclear power facility [ru

  1. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  2. United States housing, 2012

    Science.gov (United States)

    Delton Alderman

    2013-01-01

    Provides current and historical information on housing market in the United States. Information includes trends for housing permits and starts, housing completions for single and multifamily units, and sales and construction. This report will be updated annually.

  3. Chapter K: Progress in the Evaluation of Alkali-Aggregate Reaction in Concrete Construction in the Pacific Northwest, United States and Canada

    Science.gov (United States)

    Shrimer, Fred H.

    2005-01-01

    The supply of aggregates suitable for use in construction and maintenance of infrastructure in western North America is a continuing concern to the engineering and resources-management community. Steady population growth throughout the region has fueled demand for high-quality aggregates, in the face of rapid depletion of existing aggregate resources and slow and difficult permitting of new sources of traditional aggregate types. In addition to these challenges, the requirement for aggregates to meet various engineering standards continues to increase. In addition to their physical-mechanical properties, other performance characteristics of construction aggregates specifically depend on their mineralogy and texture. These properties can result in deleterious chemical reactions when aggregate is used in concrete mixes. When this chemical reaction-termed 'alkali-aggregate reaction' (AAR)-occurs, it can pose a major problem for concrete structures, reducing their service life and requiring expensive repair or even replacement of the concrete. AAR is thus to be avoided in order to promote the longevity of concrete structures and to ensure that public moneys invested in infrastructure are well spent. Because the AAR phenomenon is directly related to the mineral composition, texture, and petrogenesis of the rock particles that make up aggregates, an understanding of the relation between the geology and the performance of aggregates in concrete is important. In the Pacific Northwest, some aggregates have a moderate to high AAR potential, but many others have no or only a low AAR potential. Overall, AAR is not as widespread or serious a problem in the Pacific Northwest as in other regions of North America. The identification of reactive aggregates in the Pacific Northwest and the accurate prediction of their behavior in concrete continue to present challenges for the assessment and management of geologic resources to the owners and operators of pits and quarries and to the

  4. An Integrated Approach to Bias in a Longitudinal Survey in the United Kingdom: Assessing Construct, Method, and Item Bias in the General Health Questionnaire (GHQ-12).

    Science.gov (United States)

    Benítez, Isabel; Adams, Byron G; He, Jia

    2017-11-01

    Construct, method, and item bias are three levels of measurement bias (i.e., internal bias) essential for valid group comparisons. While many studies often focus on only one level of bias, an integrated perspective on bias is still missing, especially in longitudinal designs. The aim of this study is to address bias in an integrated manner, using four waves of data in the U.K. Longitudinal Household Panel Survey. Responses to the General Health Questionnaire (GHQ-12) from natives and two generations of immigrants were used to analyze the three levels of bias. While the basic structure of the GHQ-12 was stable across groups and time, item and method bias decreased with repeated administrations. Results were confirmed with a sensitivity test. The integrated results allowed for a distinction between temporal sources of bias that became smaller over time and sources affecting valid comparisons persistently. We discuss the implications for mental health assessment.

  5. European cooperation under the modernization program of the Kozloduy NPP units 5 and 6 and its evolution during the Belene NPP construction

    International Nuclear Information System (INIS)

    Hoch, G.

    2005-01-01

    The major part of the modernization program for the Kozloduy NPP units 5 and 6 is being performed by the European Consortium Kozloduy (ECK), consisting of AREVA - FRAMATOME ANP (Germany and France) and Atomenergoexport (Russia). The ECK main project, consisting of 76 separate measures, shall be finished in the first half of 2006. One of the major tasks was to form the different teams on contractors and employers side such that the works can be executed effectively in a timely manner and as per the technical and quality requirements. Different actions were undertaken on both sides in order to assure the main target, namely to implement the complete scope of work within the contractual time schedule. So far it can be reported that the teams have successfully worked and as a matter of fact at present more than 100 outage days have been saved compared to the initial contractual time schedule. This important result is based on different success factors in the field of planning, engineering and design, outage organization, implementation including testing and commissioning, quality assurance. After the decision of Bulgaria to continue the erection of Belene NPP, a bidding consortium has been founded by the ECK Consortium members, in order to provide a joint offer for this project. The good reputation, expertise and the experience gained from the Kozloduy NPP units 5 and 6 modernization project together with a reliable network with Bulgarian industrial partners may contribute the utmost to a successful finalization of the Belene NPP. (author)

  6. Authorization procedure for the construction and operation of nuclear installations within certain non-member states of the European Communities. Canada, Spain, Sweden, Switzerland, the United States and Yugoslavia 1975

    International Nuclear Information System (INIS)

    Amaducci, Sandro; Dider, J.M.

    1976-01-01

    In all the countries considered except Switzerland, a formal site approval for a future nuclear installation is necessary before any request for construction can be placed with the licensing authority. Moreover, two separate authorizations - one for construction and the other for operation - are needed before full operations can begin. It is only in Sweden that no express application is required for a full operating authorization. Between the respective authorizations for construction and full operation, there are, in Canada, Spain and Sweden, one or more intermediate formal authorizations to be delivered by the licensing authority, and this alongside the progressive full loading of the nuclear installation concerned. As regards the decision-making level, the relevant authorizations are generally issued at centralized level, except in Yugoslavia, and to a certain extent, in Switzerland - this being because of the federal structure of these countries. Furthermore, public hearings are organized during the authorization procedure, except in Switzerland and Yugoslavia. Finally, there are steps which are very particular to the country concerned. In Canada, there is an informal 'application' and discussion between the 'applicant' and the licensing authority before the real procedure begins, whereas in the United States, the Attorney General carried out an anti-trust review at a pre-procedural stage. Further it is only in the latter country that time requirements are fixed by regulations for certain steps of the procedure

  7. Construction aggregates

    Science.gov (United States)

    Tepordei, V.V.

    1994-01-01

    Part of a special section on industrial minerals in 1993. The 1993 production of construction aggregates increased 6.3 percent over the 1992 figure, to reach 2.01 Gt. This represents the highest estimated annual production of combined crushed stone and construction sand and gravel ever recorded in the U.S. The outlook for construction aggregates and the issues facing the industry are discussed.

  8. FFTF constructibility

    International Nuclear Information System (INIS)

    Weber, S.A.; Hulbert, D.I.

    1975-01-01

    The influence of the design criteria on the constructibility of the Fast Flux Test Facility is described. Specifically, the effects of requirements due to maintenance accessibility, inerting of cells, seismicity, codes, and standards are addressed. The design and construction techniques developed to minimize the impact of the design criteria on cost and schedule are presented with particular emphasis on the cleanliness and humidity controls imposed during construction of the sodium systems. (U.S.)

  9. The Paradox of Religion: The (reConstruction of Hindu and Muslim Identities amongst South Asian Diasporas in the United States

    Directory of Open Access Journals (Sweden)

    Aminah Mohammad-Arif

    2007-10-01

    Full Text Available In the process of (reconstructing their identities in an alien society, South Asians have tended to give to religion a significant importance. This salience of religion owes as much to the dislocation and the stigmatization engendered by the migration experience as to the local context, the United States, who, while promoting a policy of multiculturalism, sees religion as an ‘acceptable’ identity marker. Drawing on this process, this article examines the implications on the inter-ethnic relationships, in particular between Hindus and Muslims (both Indian and Pakistani, as two opposite and competing trends are underway: on the one hand, separate, if not confrontational, Hindu and Muslim identities are arising, while on the other hand, a South Asian identity, ignoring the borders of Partition, is shaping up.

  10. Synthesis, structure and characterization of two new copper(I)-thioarsenates (III) constructed by the [AsS3]3− and CuSx units

    International Nuclear Information System (INIS)

    Yao, Hua-Gang; Ji, Min; Ji, Shou-Hua; An, Yong-Lin

    2013-01-01

    Two new copper(I)-thioarsenates(III), CsCu 2 AsS 3 (1) and KCu 4 AsS 4 (2), have been synthesized solvothermally in the presence of copper powder. Compound 1 is built up of trigonal AsS 3 pyramid, tetrahedral CuAsS 3 and CuS 3 moieties forming 4-membered, 5-membered and 6-membered rings. The fusion of these rings produces layered anions [Cu 2 AsS 3 ] − , and cesium cations are located between metal-sulfide layers. The structure of 2 consists of infinite [Cu 2 S 2 ] 2− chain and layered [Cu 6 As 2 S 6 ] linked to form a three-dimensional anionic framework, [Cu 4 AsS 4 ] – , and containing channels in which the potassium cations reside. - Graphical abstract: Qne layered CsCu 2 AsS 3 and one framework KCu 4 AsS 4 possessing noncondensed [AsS 3 ] 3− unit have been synthesized solvothermally. The optical band gaps of the two compounds are 2.3 and 1.8 eV, respectively. Highlights: ► We obtained two new copper(I)-thioarsenate(III), CsCu 2 AsS 3 and KCu 4 AsS 4 . ► Both compounds possess noncondensed [AsS 3 ] 3− unit and represent new structure types. ► The optical band gaps of the two compounds are 2.3 eV and 1.8 eV, respectively.

  11. EDUCATIONAL CONSIDERATIONS FOR CONSTRUCTION TECHNOLOGY AND ADMINISTRATION MAGISTRATURE UNDER CONSTRUCTION SPECIALTY (08.04.01

    Directory of Open Access Journals (Sweden)

    Olejnik Pavel Pavlovich

    2016-12-01

    Full Text Available This Paper discusses some Educational Considerations for Construction Technology and Administration Magistrature under Construction Specialty. The main requirements to the level of the enacted construction and housing maintenance and utilities standards have been described and the need for the Construction Technology and Administration Magistrature has been outlined. The Construction Technology and Administration Magistrature 3-Unit Structure meeting the Construction Specialty (08.04.01 Federal State Educational Standards has been presented. The basic Magistrature Unit consist of the following two disciplines — Scientific Research Basics and Construction Professional Basics. The basics of the Additional Unit include Construction Design — Construction Operations Preparation System, Construction and Assembly Operations — Construction Quality Control Sys-tem. In the Additional Unit, there are the options open for a number of disciplines. The Magistrature envisages a work placement and a scientific & research study.

  12. Cognitive biases in energy decisions during the planning, design, and construction of commercial buildings in the United States. An analytical framework and research needs

    Energy Technology Data Exchange (ETDEWEB)

    Klotz, L. [Clemson University, 208 Lowry Hall, Clemson, SC 29634 (United States)

    2011-03-15

    Despite a national goal for every building to achieve net-zero energy by 2050 and despite exemplary projects proving the technical and economic feasibility of much better energy performance, commercial buildings in the USA today use more energy per square foot than they ever have. Decisions made during planning, design, and construction (delivery) of commercial buildings appear systematically irrational, not maximizing utility for designers, occupants, or society. In other fields, notably economics, improved understanding of cognitive biases like 'loss aversion' and 'anchoring' has helped to explain seemingly irrational decision making. Related work has examined these cognitive biases for energy decisions made in an occupied building. Less clear is the role these cognitive biases play in the high-impact, long-term energy decisions made during commercial building delivery. As an initial step towards addressing this gap in understanding, this paper outlines key energy decisions in commercial building delivery and shows how cognitive biases may impact these decisions. A suggested approach to study these biases, and to design policies that address them, is provided. By highlighting these potential cognitive biases, based on an understanding of the building delivery process, this paper aims to engage those with relevant expertise in the behavioral and social sciences to help address the decision making that is preventing progress towards improved energy performance in commercial buildings.

  13. Final environmental impact statement for the construction and operation of an independent spent fuel storage installation to store the Three Mile Island Unit 2 spent fuel at the Idaho National Engineering and Environmental Laboratory. Docket Number 72-20

    International Nuclear Information System (INIS)

    1998-03-01

    This Final Environmental Impact Statement (FEIS) contains an assessment of the potential environmental impacts of the construction and operation of an Independent Spent Fuel Storage Installation (ISFSI) for the Three Mile Island Unit 2 (TMI-2) fuel debris at the Idaho National Engineering and Environmental laboratory (INEEL). US Department of Energy-Idaho Operations Office (DOE-ID) is proposing to design, construct, and operate at the Idaho Chemical Processing Plant (ICPP). The TMI-2 fuel debris would be removed from wet storage, transported to the ISFSI, and placed in storage modules on a concrete basemat. As part of its overall spent nuclear fuel (SNF) management program, the US DOE has prepared a final programmatic environmental impact statement (EIS) that provides an overview of the spent fuel management proposed for INEEL, including the construction and operation of the TMI-2 ISFSI. In addition, DOE-ID has prepared an environmental assessment (EA) to describe the environmental impacts associated with the stabilization of the storage pool and the construction/operation of the ISFSI at the ICPP. As provided in NRC's NEPA procedures, a FEIS of another Federal agency may be adopted in whole or in part in accordance with the procedures outlined in 40 CFR 1506.3 of the regulations of the Council on Environmental Quality (CEQ). Under 40 CFR 1506.3(b), if the actions covered by the original EIS and the proposed action are substantially the same, the agency adopting another agency's statement is not required to recirculate it except as a final statement. The NRC has determined that its proposed action is substantially the same as actions considered in DOE's environmental documents referenced above and, therefore, has elected to adopt the DOE documents as the NRC FEIS

  14. Construction fraud

    NARCIS (Netherlands)

    Graafland, J.J.; Liedekerke, L.; Dubbink, W.; van Liedekerke, L.; van Luijk, H.

    2011-01-01

    Due to the actions of a whistleblower The Netherlands was confronted with a massive case of construction fraud involving almost the entire construction sector. Price fixing, prior consulting, duplicate accounts, fictitious invoices and active corruption of civil servants were rampant practices. This

  15. Superstring construction

    CERN Document Server

    1989-01-01

    The book includes a selection of papers on the construction of superstring theories, mainly written during the years 1984-1987. It covers ten-dimensional supersymmetric and non-supersymmetric strings, four-dimensional heterotic strings and four-dimensional type-II strings. An introduction to more recent developments in conformal field theory in relation to string construction is provided.

  16. Usability Constructs

    DEFF Research Database (Denmark)

    Hertzum, Morten; Clemmesen, Torkil; Hornbæk, Kasper Anders Søren

    2007-01-01

    frustrating systems are experienced similarly to easy-to-use systems. Looking at the most characteristic construct for each participant we find that Chinese participants use constructs related to security, task types, training, and system issues, whereas Danish and to some extent Indian participants make more...

  17. Inorganic-organic hybrid materials with different dimensions constructed from copper-fluconazole metal-organic units and Keggin polyanion clusters.

    Science.gov (United States)

    Li, Shun-Li; Lan, Ya-Qian; Ma, Jian-Fang; Yang, Jin; Liu, Jie; Fu, Yao-Mei; Su, Zhong-Min

    2008-04-21

    Inorganic-organic hybrid materials based on Keggin polyoxometalate building blocks combined with Cu(II)/Cu(I) and flexible fluconazole ligand [1-(2,4-difluorophenyl)-1,1-bis[(1H-1,2,4-triazol-1-yl)methyl]methanol] (Hfcz) have been obtained by hydrothermal methods, namely, [Cu(II)(2)(Hfcz)(4)(SiW(12)O(40))].3H(2)O (1), [Cu(II)(4)(fcz)(4)(H(2)O)(4)(SiMo(12)O(40))].6H(2)O (2), [Cu(II)(2)(fcz)(2)][Cu(II)(4)(fcz)(4)(SiW(12)O(40))][Cu(II)(2)(fcz)(2)(H(2)O)(2)(SiW(12)O(40))].6H(2)O (3), (Et(3)NH)(2)[Cu(I)(2)(Hfcz)(2)(SiW(12)O(40))].2H(2)O (4), (Et(3)NH)(2)[Cu(I)(2)(Hfcz)(2)(SiW(12)O(40))].H(2)O (5) and [Cu(I)(4)(Hfcz)(4)(SiMo(12)O(40))] (6). Their structures have been determined by single-crystal X-ray diffraction analyses, and the compounds are further characterized by elemental analyses, IR spectra and thermogravimetric (TG) analyses. In 1, Cu(II) cations are bridged by fluconazole ligands to form a 3D lvt coordination polymeric network, which is connected by (SiW(12)O(40))(4-) anions to form a complicated 3D (4,6)-connected framework with the topology of (4(2).6(4))(4(6).6(7).8(2))(2). In 2, two fcz(-) anions chelate two Cu(2+) cations to form a [Cu(fcz)](2)(2+) dimer, which is bridged by (SiW(12)O(40))(4-) polyanions to generate a 2D (4,4) grid. Compound 3 is formed by three types of co-crystallizing subunits including a dimer [Cu(fcz)](2)(2+), a dumbbell molecule [Cu(4)(fcz)(4)(SiW(12)O(40))] and an infinite chain {[Cu(2)(fcz)(2)(H(2)O)(2)(SiW(12)O(40))](2-)}(infinity). In compounds 4 and 5, Hfcz ligands link Cu(+) cations to generate 1D coordination polymeric units, and (SiW(12)O(40))(4-) polyanions connect these metal-organic units to form two types of (6(3)) sheets which are topological isomerism. In compound 6, (SiMo(12)O(40))(4-) polyanions fixed in Cu(I)-Hfcz square rings are further extended into a 2D sheet via linking Cu(I) atoms of different rings. By carefully inspection of the structures of 1-6, it is believed that various transition-metal organic units

  18. Nuclear power plant construction activity, 1984

    Energy Technology Data Exchange (ETDEWEB)

    None

    1985-07-01

    This report presents cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1984. Also presented are data on units that were canceled during 1984. Three types of information are included: plant characteristics and ownership; construction costs; construction schedules; and milestone dates. The reactor-specific cost data presented include estimated final costs for plants in construction and disbursed costs for each unit (funds already expended and funds committed but not yet expended) as of December 31, 1984, as reported by the utilities. In EIA's last report on nuclear construction costs, published in November 1984, 43 units were reported to be under construction or completed but not in commercial operation as of March 31, 1984; 12 units were reported to be deferred as of March 31, 1984; and 2 units were planned. The status of those units as of December 31, 1984, is summarized. Of the 43 units under construction, 4 entered commercial operation, 38 were still under construction, and 1 was reported as deferred. Of the 12 units deferred as of March 31, 1984, 6 remained in deferred status, and 6 were canceled. The 2 planned units remained in the planning stage as of December 31, 1984.

  19. Design and construction of a long-term continuous video-EEG monitoring unit for simultaneous recording of multiple small animals.

    Science.gov (United States)

    Bertram, E H; Williamson, J M; Cornett, J F; Spradlin, S; Chen, Z F

    1997-12-01

    In recent years several new rat models of human limbic/mesial temporal lobe epilepsy have been described [1,2,4-7,11,15-17]. Unlike earlier models such as kindling in which the seizures are induced by an exogenous stimulus, these new models are characterized by seizures that occur spontaneously at random intervals. Although the spontaneity of the seizures makes these models more like human epilepsy, documentation of these seizures by direct observation is highly inefficient, and sub-behavioral electrographic seizures could be missed. Continuous paper EEG and video recording have been used [5-7,15], but these techniques are resource intensive. The slow paper speed required by long-term paper recordings limits the ability to differentiate between true seizure activity and electrical artifact. Subtle behavioral seizures are likely to be missed during rapid review of video recordings alone [16]. Ambulatory cassette EEG recordings have been used [3], but the systems require expensive proprietary hardware, and the systems have limited channels for recording (8-16). To improve the utility of the models, we developed a long-term EEG/video monitoring system to detect the electrographic seizures and document their behavioral accompaniment. The system is based on commercially available components, including a computerized EEG seizure detection system that was initially developed for human seizure monitoring [8,9,13]. Seizures are reliably detected and the data are reduced so that 24 h of recording can be reviewed in 30-90 min. Although the computer program is accurate, special care must be taken in system design and construction to reduce sources of electrical artifact that can cause false detections when multiple animals are recorded simultaneously on a single EEG machine. During data review it is necessary to differentiate between electrical artifact induced by animal activity from true seizure activity by key EEG patterns. Certain seizure patterns (less than 3 hz. low

  20. Insect control in socialist China and the corporate United States: the act of comparison, the tendency to forget, and the construction of difference in 1970s U.S.-Chinese scientific exchange.

    Science.gov (United States)

    Schmalzer, Sigrid

    2013-06-01

    In 1975, a delegation of U.S. entomologists traveled to socialist China to observe Chinese insect control science. Their overwhelmingly positive reports highlighted in relief the pernicious effects of pesticide corporations on U.S. agriculture; some entomologists hoped this would goad the United States to catch up to China in environmentally sensible insect control practices. Of course, insect control in socialist China carried its own political baggage, some of which-for example, mass mobilization and self-reliance--the state made highly visible to visitors, and some of which--for example, harsh treatment of scientists--it sought to obscure. For both the U.S. and the Chinese participants, the act of comparison itself was of primary significance in the exchange, allowing them to construct socialist Chinese science as refreshingly different from U.S. science. At the same time, however, this construction of difference meant forgetting the much longer transnational history in which U.S. and Chinese entomology had been intertwined.

  1. Final environmental statement related to construction of Cherokee Nuclear Station, Units 1, 2, and 3: (Docket Nos. STN 50-491, STN 50-492, and STN 50-493)

    International Nuclear Information System (INIS)

    1975-10-01

    The proposed action is the issuance of a construction permit to the Duke Power Company for the construction of the Cherokee Nuclear Station (CNS) Units 1, 2, and 3 located in Cherokee County, South Carolina. A total of 2263 acres will be removed from public use for the CNS site. Construction-related activities on the site will disturb about 751 acres. Approximately 654 acres of land will be required for transmission line right-of-way, and a railroad spur will affect 83 acres. This constitutes a minor regional impact. No significant environmental impacts are anticipated from normal operational releases of radioactive materials. The total annual dose to the US population (total body plus thyroid) from operation of the plant is 210 man-rems which is less than the normal fluctuations in the background dose this population would receive. The occupational dose is approximately 1400 man-rems/year. The heat dissipation system will require a maximum water makeup of 55,814 gpm, of which 50,514 gpm will be consumed due to drift and evaporative losses. This amount represents 4.5% of the mean monthly flow and 23.8% of the low flow of the Broad River. The cooling tower blowdown and chemical effluents from the station will increase the dissolved solids concentration in the river by a maximum of 44 ppM. The thermal alterations and increases in total dissolved solids concentration will not significantly affect the aquatic productivity of the river. 114 refs., 25 figs., 46 tabs

  2. ABWR construction experience in Japan

    International Nuclear Information System (INIS)

    Kawahata, Junichi; Miura, Jun; Saito, Fuyuki; Mori, Hiroya

    2003-01-01

    The construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and 7 (K6 and 7) owned by Tokyo Electric Power Company (TEPCO), have been in service since November 1996 and September 1997 respectively, and are the first ABWRs in the world. Hitachi, Ltd. and Toshiba Corporation took part in the projects and achieved safety construction in 52- month schedule from rock inspection to turnover in cooperation with TEPCO and other contractors with broad experience in BWRs. Taking advantage of experience of the Kashiwazaki construction, the ABWR construction methods realize to satisfy with requests from electric power companies and to fit site conditions. The Chubu Electric Power Company's Hamaoka Nuclear Power Station Unit No. 5 (Hamaoka 5) and Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2), which are ABWRs, completed rock inspection in May 2000 and June 2001 respectively, and are under construction. The ABWR construction methods are proved their validity through four actual construction projects. Safe constructions with the highest quality have been advanced thus further aiming at the introduction of the latest technologies and contributing to reduce plant construction costs and also to shorten schedule. (author)

  3. Fuqing nuclear power of nuclear steam turbine generating unit No.1 at the implementation and feedback

    International Nuclear Information System (INIS)

    Cao Yuhua; Xiao Bo; He Liu; Huang Min

    2014-01-01

    The article introduces the Fuqing nuclear power of nuclear steam turbine generating unit no.l purpose, range of experience, experiment preparation, implementation, feedback and response. Turn of nuclear steam turbo-generator set flush, using the main reactor coolant pump and regulator of the heat generated by the electric heating element and the total heat capacity in secondary circuit of reactor coolant system (steam generator secondary side) of saturated steam turbine rushed to 1500 RPM, Fuqing nuclear power of nuclear steam turbine generating unit no.1 implementation of the performance of the inspection of steam turbine and its auxiliary system, through the test problems found in the clean up in time, the nuclear steam sweep turn smooth realization has accumulated experience. At the same time, Fuqing nuclear power of nuclear steam turbine generating unit no.1 at turn is half speed steam turbine generator non-nuclear turn at the first, with its smooth realization of other nuclear power steam turbine generator set in the field of non-nuclear turn play a reference role. (authors)

  4. Drywall construction and asbestos exposure.

    Science.gov (United States)

    Fischbein, A; Rohl, A N; Langer, A M; Selikoff, I J

    1979-05-01

    The rapid development of the drywall construction trade in the United States is described. It is estimated that some 75,000 U.S. construction workers are currently employed in this trade. The use of a variety of spackle and taping compounds is shown to be associated with significant asbestos exposure; air samples taken in the breathing zone by drywall tapers during sanding of taping compounds show fiber concentrations exceeding, by several times, the maximum level permitted by United States Government regulations. These findings are given together with the result of a clinical field survey of drywall construction workers demonstrating that asbestos disease may be an important health hazard in this trade.

  5. Construction work

    CERN Multimedia

    2004-01-01

    Construction work on building 179 will start on the 16th February 2004 and continue until November 2004. The road between buildings 179 and 158 will temporarily become a one way street from Route Democrite towards building 7. The parking places between buildings 179 and 7 will become obsolete. The ISOLDE collaboration would like to apologize for any inconveniences.

  6. Scale Construction.

    Science.gov (United States)

    Dawis, Rene V.

    1987-01-01

    Discusses design, development, and evaluation of scales used in counseling psychology research. Describes methods of scale construction including the Thurstone, Q-sort, rank-order methods, Likert, semantic differential, Guttman, Rasch, and external criterion methods. Presents ways of evaluating newly developed scales. Discusses measurement versus…

  7. Modelling Constructs

    DEFF Research Database (Denmark)

    Kindler, Ekkart

    2009-01-01

    , these notations have been extended in order to increase expressiveness and to be more competitive. This resulted in an increasing number of notations and formalisms for modelling business processes and in an increase of the different modelling constructs provided by modelling notations, which makes it difficult......There are many different notations and formalisms for modelling business processes and workflows. These notations and formalisms have been introduced with different purposes and objectives. Later, influenced by other notations, comparisons with other tools, or by standardization efforts...... to compare modelling notations and to make transformations between them. One of the reasons is that, in each notation, the new concepts are introduced in a different way by extending the already existing constructs. In this chapter, we go the opposite direction: We show that it is possible to add most...

  8. Constructability and maintainability

    International Nuclear Information System (INIS)

    Hart, R.S.

    1985-01-01

    A set of principles for minimizing the construction schedule was established at the outset of the CANDU 300 programme. Consideration of these principles and other factors led to the development of the unique CANDU 300 station layout. The paper discusses the CANDU 300 station layout and construction methods. In summary, the station layout provides 360 deg. construction access to all buildings, separation of nuclear and non-nuclear systems, precise and minimal physical interfaces between buildings, accommodation of many contractors and construction activities without interference, and maximum flexibility in terms of constructional, financial and supply arrangements. The CANDU 300 further employs modularization, shop fabrication and advanced instrumentation (multiplexers, remote processors, data highways) to minimize construction time. Many of the CANDU 300 features that enhance constructability also contribute to maintainability. These include the 360 deg. access to all principal buildings, the uncluttered and spacious building layouts, the simplification of systems and the high level of modularization. The CANDU 300 has also been designed to facilitate the replacement of all key components, thereby offering an essentially unlimited station life. A prime example is a reduction in the fuel channel inlet end-fitting diameter such that the fuel channels can be shop assembled and easily replaced after the initial 40 years of operation, without an extended unit outage. Maintainability within the reactor building has been given particular attention in the CANDU 300 design; key features of other CANDU reactors (the ability to replace a heat transport system pump motor at power, for example) have been incorporated, while accessibility and maintainability of all systems and components have been enhanced. These and other aspects of maintainability are discussed. (author)

  9. 30 CFR 7.67 - Construction test.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Construction test. 7.67 Section 7.67 Mineral... MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Multiple-Shot Blasting Units § 7.67 Construction test. The constuction test is to be performed on the blasting unit subsequent to the output energy test of...

  10. Research on construction quality and improvement of assembly construction

    Science.gov (United States)

    Cheng, Fei

    2017-11-01

    Based on the acceleration of the urbanization process and the improvement of the quality of life of our residents, the demand for building construction has been increasing. In this context, the construction industry in order to promote the construction efficiency, quality improvement, to meet the needs of the development of the times to strengthen the new technology, the use of new technologies. At present, China’s engineering construction units in the process of carrying out the project to strengthen the use of assembly-type construction technology, which thus achieved for the traditional construction work low-level, high time-consuming issues, and promote the steady improvement of production efficiency. Based on this, this paper focuses on the analysis of the connotation of the assembly structure and analyzes the quality problems in the construction process of the construction projects and puts forward the improvement measures to promote the improvement of the building quality and the construction of the building Construction speed. Based on this, this paper analyzes the structural system and design of prefabricated building.

  11. Constructing Catalonia

    Directory of Open Access Journals (Sweden)

    Bill Philips

    2009-07-01

    Full Text Available Catalonia, in common with other nations, has long been concerned with the question of identity and difference. Its problematic relationship with Spain has led to an emphasis on differentiating itself from its larger neighbour (if we are to accept, as most Spaniards do not, that Catalonia is not Spain, a situation complicated by the loss of the Spanish colonies of Cuba and The Philippines in 1898, and the Spanish Civil War and subsequent dictatorship from 1936 to 1976. Beginning in the late nineteenth century, the construction of a Catalan identity followed a similar route to that taken by other European nations such as England, Ireland and, indeed, Spain, including an emphasis on rural values, activities and the countryside, and the conversion of specifically local traditions into national past times. It is only in the last ten years or so that this model of Catalan identity has been recognised for what it is – a model constructed and encouraged for and by specific nationalist political interests. Ironically, Catalonia’s identity abroad has also been constructed and manipulated for political purposes, but from quite a different perspective. Orwell’s /Homage to Catalonia/ (1938 narrates an extremely blinkered version of the Spanish Civil War which has achieved iconic status as a result of cold war politics. Subsequent portrayals of the Spanish Civil War – Valentine Cunningham’s /The Penguin Book of Spanish Civil War Verse/ (ed., Penguin, 1980, or Ken Loach’s 1995 film /Land and Freedom/ base their arguments unquestioningly on /Homage to Catalonia/, perpetuating a view of the nation’s recent history that is both reductive and inaccurate

  12. Layout Construction

    DEFF Research Database (Denmark)

    Frandsen, Gudmund Skovbjerg; Palsberg, Jens; Schmidt, Erik Meineche

    We design a system for generating newspaper layout proposals. The input to the system consists of editorial information (text, pictures, etc) and style information (non-editorial information that specifies the aesthetic appearance of a layout). We consider the automation of layout construction...... to pose two main problems. One problem consists in optimizing the layout with respect to the constraints and preferences specified in the style information. Another problem consists in finding a representation of the style information that both supports its use in the combinatorial optimization...

  13. 46 CFR 108.235 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Construction. 108.235 Section 108.235 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Helicopter Facilities § 108.235 Construction. (a) Each helicopter deck must be...

  14. Military Construction: Process and Outcomes

    Science.gov (United States)

    2016-12-14

    has an investment item unit cost that is greater than $250,000. O&M funds may finance things such as headquarters operations, civilian salaries...document to request construction funding from Congress. The form is used to explain each proposed construction project individually and includes a cost ...beginning with the realization of the need for a facility and ending with its dedication and the opening of its doors for occupancy. The process

  15. Cooperation in Construction:

    DEFF Research Database (Denmark)

    Vogelius, Peter; Storgaard, Kresten

    2016-01-01

    . The management logic of the main contractor is interpreted as based on a sociology-inspired understanding focusing on norms and social values rather than on contractual (law) and functional (engineering) logic, which had hitherto been prevalent in Danish construction management.......The study presents a building project executed by a major Danish construction company, where cooperation and its staging were essential for achieving high productivity and competitiveness. The form of this cooperation is the main theme for the article. The contractor actively changed...... the companies in the case can be understood as possessing a social capital which is enforced and united by initiatives of the main contractor. The social capital was built up and maintained through the actual constitution of cooperation already in the initial phase of bidding before the building process...

  16. A Digital Loudspeaker: Experimental Construction

    OpenAIRE

    P. Valoušek

    2006-01-01

    To verify the principal functionality of a digital loudspeaker the experimental construction of a digital loudspeaker was designed. This system consists of signal processing unit and transducer array. Both parts offer 8-bit precision and wide a spectrum of sampling frequencies. The signal processing unit is based on a programmable logic device which provides a flexible system for preparing a driving signal. The transducer array is formed by conventional dynamic transducers arranged in a circl...

  17. Safety in construction industry - overview

    International Nuclear Information System (INIS)

    Chockalingam, S.; Nehru, R.M.; Ramprasad, K.; Sonawane, A.U.

    2016-01-01

    The construction industry plays an important role in the social and economic development in a country. Safety in the construction industry is considered a major issue in developed and developing countries. In urban sector of India increasing numbers of workers have taken up construction work as a means of immediate employment, which provides cash earnings at the end of the day. Being as unorganized sector, the fatal injuries in DAE unit for the construction industry (Nuclear Power Project including BHAVINI: 62.7% from 1999 to 2014) is higher than the category for all other units (UCIL:13.3%; ECIL:6.7%; NFC and ZC: 4%; HWP: 2.7%; IREL:2.7%; Nuclear Power Plant: 2.7% etc., from 1999 to 2014). A variety hazards exist in the construction site. The best way to protect workers against workers against hazards is to control problems at the source. The problem regarding construction industry is not that the hazards and risks are unknown, but it very difficult to accurately identify in a constantly changing work environment. To prevent hazards at work, all possible hazards that may be encountered should be identified in advance through Job Hazard Analysis (JHA). The present scenario has deduced a fact that efficient Safety Management Techniques (SMT) are (essential for today's construction companies and adaptation of legal requirements including regulatory requirements and proactive safety management techniques will help organizations in providing a better workplace to its employees and reduce the accidents. (author)

  18. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    This paper discusses the three different types of productivity programs used at the Wm. H. Zimmer Nuclear Power Station construction site. The Standard Cost Estimate as Productivity Measurement compares actual units installed to estimated units. The Manpower and Equipment Utilization Study measures the present utilization level of the construction work force, identifies opportunities for productivity improvement, and establishes a data base against which future improvements could be made. The special productivity program is a specialized and detailed study of first line supervision. Productivity is defined as the degree of efficiency attained in the use of labor, professional and management skills and knowledge, materials and equipment, and time and money to produce an end result. It is concluded that a more consistent system of productivity measurements needs to be developed and promoted for general use in the construction industry

  19. Toward a constructive physics

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, H.P.; Gefwert, C.; Manthey, M.J.

    1983-06-01

    We argue that the discretization of physics which has occurred thanks to the advent of quantum mechanics has replaced the continuum standards of time, length and mass which brought physics to maturity by counting. The (arbitrary in the sense of conventional dimensional analysis) standards have been replaced by three dimensional constants: the limiting velocity c, the unit of action h, and either a reference mass (eg m/sub p/) or a coupling constant (eg G related to the mass scale by hc/(2..pi..Gm/sub p//sup 2/) approx. = 1.7 x 10/sup 38/). Once these physical and experimental reference standards are accepted, the conventional approach is to connect physics to mathematics by means of dimensionless ratios. But these standards now rest on counting rather than ratios, and allow us to think of a fourth dimensionless mathematical concept, which is counting integers. According to constructive mathematics, counting has to be understood before engaging in the practice of mathematics in order to avoid redundancy. In its strict form constructive mathematics allows no completed infinities, and must provide finite algorithms for the computation of any acceptable concept. This finite requirement in constructive mathematics is in keeping with the practice of physics when that practice is restricted to hypotheses which are testable in a finite time. In this paper we attempt to outline a program for physics which will meet these rigid criteria while preserving, in so far as possible, the successes that conventional physics has already achieved.

  20. Toward a constructive physics

    International Nuclear Information System (INIS)

    Noyes, H.P.; Gefwert, C.; Manthey, M.J.

    1983-06-01

    We argue that the discretization of physics which has occurred thanks to the advent of quantum mechanics has replaced the continuum standards of time, length and mass which brought physics to maturity by counting. The (arbitrary in the sense of conventional dimensional analysis) standards have been replaced by three dimensional constants: the limiting velocity c, the unit of action h, and either a reference mass (eg m/sub p/) or a coupling constant (eg G related to the mass scale by hc/(2πGm/sub p/ 2 ) approx. = 1.7 x 10 38 ). Once these physical and experimental reference standards are accepted, the conventional approach is to connect physics to mathematics by means of dimensionless ratios. But these standards now rest on counting rather than ratios, and allow us to think of a fourth dimensionless mathematical concept, which is counting integers. According to constructive mathematics, counting has to be understood before engaging in the practice of mathematics in order to avoid redundancy. In its strict form constructive mathematics allows no completed infinities, and must provide finite algorithms for the computation of any acceptable concept. This finite requirement in constructive mathematics is in keeping with the practice of physics when that practice is restricted to hypotheses which are testable in a finite time. In this paper we attempt to outline a program for physics which will meet these rigid criteria while preserving, in so far as possible, the successes that conventional physics has already achieved

  1. United snakes.

    Science.gov (United States)

    Liang, Jianming; McInerney, Tim; Terzopoulos, Demetri

    2006-04-01

    Since their debut in 1987, snakes (active contour models) have become a standard image analysis technique with several variants now in common use. We present a framework called "United Snakes", which has two key features. First, it unifies the most popular snake variants, including finite difference, B-spline, and Hermite polynomial snakes in a consistent finite element formulation, thus expanding the range of object modeling capabilities within a uniform snake construction process. Second, it embodies the idea that the heretofore presumed competing technique known as "live wire" or "intelligent scissors" is in fact complementary to snakes and that the two techniques can advantageously be combined by introducing an effective hard constraint mechanism. The United Snakes framework amplifies the efficiency and reproducibility of the component techniques, and it offers more flexible interactive control while further minimizing user interactions. We apply United Snakes to several different medical image analysis tasks, including the segmentation of neuronal dendrites in EM images, dynamic chest image analysis, the quantification of growth plates in MR images and the isolation of the breast region in mammograms, demonstrating the generality, accuracy and robustness of the tool.

  2. Constructibility assessment of APR1400

    International Nuclear Information System (INIS)

    Cho, Sung Jae; Kang, Yong Chul; Lee, Jae Gon; Lim, Woo Sang

    2003-01-01

    APR1400 (formerly KNGR) development is one of national G-7 projects sponsored by government and KHNP (Korea Hydro and Nuclear Power Co., LTD). It is an evolutionary standard reactor with the thermal output of 4000MWt and has been adopted for Shin-Kori Unit 3 and 4. The government organizations, research institutes, universities and industries have participated in the project since 1992 along with KHNP, and the standard design certification program was issued in May 2002. The project set up the top-tier requirements about the safety, economy, operability and maintainability, and constructibility in the early design stage. The requirements have been evaluated periodically during the design process, and the results were reflected to the design. This paper describes the methods for constructibility enhancement and the results of schedule analysis to assure meeting construction duration target, which is set to 48 months from the first concrete pouring to the commercial operation on the condition that learning effects are maximized at Nth plant. To meet the target schedule, the design characteristics and constructibility studies such as new construction methods and construction schedule analysis were performed. The new construction methods presented here are over the top method for NSSS components, deck plate and steel from for concrete wall and slab, automatic welding for large bore piping, and modularization of components and structure, etc. (author)

  3. 48 CFR 225.7014 - Restrictions on military construction.

    Science.gov (United States)

    2010-10-01

    ..., see 236.273(a). (b) For restriction on acquisition of steel for use in military construction projects... construction. 225.7014 Section 225.7014 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... construction. (a) For restriction on award of military construction contracts to be performed in the United...

  4. Hyperbolic unit groups and quaternion algebras

    Indian Academy of Sciences (India)

    K. ) , when this algebra is a division algebra. We construct units, here called Pell and Gauss units, using solutions of certain diophantine quadratic equations. In particular, we exhibit units of norm −1 in H(oQ[. √. −7]); this construction, when combined with the deep work in [5], helps to provide a set of generators for the full.

  5. Construction completion report

    International Nuclear Information System (INIS)

    1990-01-01

    This Construction Completion Report documents the major construction projects at the Waste Isolation Pilot Plant (WIPP) site and related information on contracts, schedules, and other areas which affected construction. This report is not intended to be an exhaustive detailed analysis of construction, but is a general overview and summary of the WIPP construction. 10 refs., 29 figs

  6. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  7. A Digital Loudspeaker: Experimental Construction

    Directory of Open Access Journals (Sweden)

    P. Valoušek

    2006-01-01

    Full Text Available To verify the principal functionality of a digital loudspeaker the experimental construction of a digital loudspeaker was designed. This system consists of signal processing unit and transducer array. Both parts offer 8-bit precision and wide a spectrum of sampling frequencies. The signal processing unit is based on a programmable logic device which provides a flexible system for preparing a driving signal. The transducer array is formed by conventional dynamic transducers arranged in a circle. The initial measurements and listening tests provide acceptable results that are valuable for further digital loudspeaker developments. 

  8. Concrete construction engineering handbook

    CERN Document Server

    Nawy, Edward G

    2008-01-01

    Provides coverage of concrete construction engineering and technology. This work features discussions focusing on: the advances in engineered concrete materials; reinforced concrete construction; specialized construction techniques; and, design recommendations for high performance.

  9. Implementation of the project for the construction and operation of a nuclear heat and power plant on the basis of a floating power unit with KLT-40C reactors

    International Nuclear Information System (INIS)

    Polushkin, A.K.; Kuzin, E.A.; Vorobiov, V.M.; Klykov, D.M.; Panov, J.K.

    2000-01-01

    This paper presents the results of research and development on floating nuclear power plant (FNPP) for electricity and heat production for remote locations and small island or coastal communities. Evaluations of construction period, social and economic factors as well as safety and operational issues of the non-self-propelled barge-mounted NPP is given. (author)

  10. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  11. Stonke Construction Information Sheet

    Science.gov (United States)

    Stonke Construction (the Company) is located in Anchorage, Alaska. The settlement involves renovation activities conducted at properties constructed prior to 1978, located in and around Anchorage, Alaska.

  12. Development of Innovative Construction Technologies for ABWRs

    International Nuclear Information System (INIS)

    Yamashita, T.; Fukuda, T.; Masuda, N.

    2002-01-01

    This paper describes an effort by Tokyo Electric Power Company (TEPCO) to shorten the construction time in a drastic manner for the Advanced Boiling Water Reactors (ABWR), thereby aiming at reducing construction costs. First an outline of the actual construction records for the five BWR Units and the two ABWR Units at the Kashiwazaki-Kariwa site is introduced along with the construction methods employed for these units. There is a continued trend in the reduction of construction time from Unit 1 to 7 owing to a number of improvements made to these units, and in particular it is noteworthy that the drastic reduction was accomplished due to the change in reactor type from BWR to ABWR. Explained next is an on-going effort for the next ABWR and the following next generation of ABWRs to further shorten construction time. In this effort an emphasis is laid on the development of innovative construction methods by the adoption of steel plate/concrete composite structures (SC Structure), and the application of those structures even to containment vessel (so-called SCCV). This work is being conducted as part of TEPCO's research and development for the next generation ABWRs (ABWR II). Presently it is expected that the construction time from bedrock inspection to fuel loading could be shortened in a stepwise fashion to 38 and 31.5 months for the next ABWR and finally to 23 months for the next generation ABWR II, thus enabling a greatly reduced power generating cost and enhanced safety during construction. In addition to the above effort, a preliminary study has been performed concerning the application of base isolation systems to ABWR plants. From this study which is aimed at standardization, lowered cost and mitigation of engineering work, it was found that base isolation system effectively reduces seismic response and is instrumental in achieving the above-mentioned objectives. Therefore it can be said that the use of this system gives more freedom in selecting sites

  13. Cernavoda NPP Unit 2 and Romanian nuclear industry

    International Nuclear Information System (INIS)

    Mocanu Horia

    2001-01-01

    On 18 May 2001, in the presence of Mr. Adrian Nastase, the Prime-Minister of Romania, the presidents of AECL, ANSALDO and Director General of SN Nuclearelectrica, the commercial and management contract for completing the Cernavoda NPP Unit 2 was signed. This document stipulates the goal and the partners' commitments, leadership organization, the SN Nuclearelectrica's control of the Budget, costs for the technical assistance (around 180 specialists from abroad), as well as the costs of equipment supplied from Canada and Italy. Services and equipment supplied by Canada and Italy amounts up to around USD 300 millions. Efforts are currently undertaken to obtain a loan of USD 300 millions from EURATOM, beginning from 2003. An auction process, implying around 10 companies, is underway and by the completion of the process, in February 2002, the practical delivery of equipment will start. The so-far invested capital amounts around USD 650 millions while the capital funds remaining to be invested amounts up to about USD 689 millions. From the latter figure, around USD 100 millions represent the costs for heavy water and the initial nuclear fuel charging. The personnel dynamics is presented as well as problems relating with recruitment and salary policy. Romanian nuclear industry is engaged for supply of a series of important components. General Turbo SA, supplied already components of some tens USD millions for the turbogenerator complex. PETROTUB company from Roman, Romania supplied already one thousand tones of non-nuclear carbon steel tubing valued at about USD 300 millions. ARIO, Bistrita, Romania, has signed contracts valued at about USD 400,000 for non-nuclear reinforcing materials. Other companies like AVERSA SA and Ventilatorul SA supplied reliable equipment for Unit 1 and will continue to do the same for Unit 2. Contracts of over one million USD are carried on with VULCAN for carbon steel fittings and with TITAN Nuclear Equipment for components of the fueling

  14. Final site environmental statement: Blue Hills Station, Unit Nos. 1 and 2. Related to the determination of the suitability of Site G for eventual construction. Docket Nos. 50-510 and 50-511

    International Nuclear Information System (INIS)

    1978-07-01

    The site suitability analysis is based on the assumption that the Blue Hills Station will employ two pressurized water reactors to produce outputs of approximately 2814 MWt each. Two steam turbine generators will use the heat produced to provide approximately 957 MWe (gross) each. The exhaust steam will be cooled by four low-profile round mechanical-draft cooling towers. Assuming construction of a nuclear station at site G, a summary of environmental impacts and adverse effects is presented

  15. Innovative rock bed construction

    Energy Technology Data Exchange (ETDEWEB)

    Cook, J.

    1983-06-01

    A general discussion of the use of rock beds for heating and cooling thermal storage is particularized for design and construction in Phoenix, Arizona. The rock bed parameters for three two-story condominium apartments constructed in 1982 are discussed, including sizing criteria and original construction details. A revised construction method using gabions that are self-supporting chain link cylinders provided a much more economical construction method as well as other advantages of speed and structural flexibility.

  16. Unit Manning

    National Research Council Canada - National Science Library

    McGinniss, Mike

    2003-01-01

    .... Army Alaska, will be the first Army unit manned under the Unit Manning Initiative. The Army's intent for unit manning is to improve combat readiness and cohesion while setting conditions for improved soldier and family well...

  17. The use of area-oriented work breakdown structures in developments of EPC of process unit; Emprego de estruturas analiticas de projeto orientadas por area fisica em empreendimentos EPC (Engineering, Procurement and Construction) de unidade de processo

    Energy Technology Data Exchange (ETDEWEB)

    Salloum, Joao; Balbi, Diego J.G. [Promon Engenharia Ltda., Rio de Janeiro, RJ (Brazil)

    2012-07-01

    The use of area-oriented work breakdown structures has been proven as a very useful tool for supporting the 'scope detailing' processes in construction projects. This practice allows the definition of intermediate work packages, assisting in the distribution of the scope to be executed within the different team members (or subcontractors), and also allowing the definition of a basic construction strategy based on the main project constraints reflected in each physical area (delivery lead-time of long lead items, for example), to be used as a guide for developing a preliminary master schedule for engineering e procurement activities with a better alignment with the construction strategy. In this way the detailed engineering activities can be developed based on this structure allowing, for example, the possibility of issue piping isometrics and plants under this structure. It's common to split the scope according to the physical location on the eve of starting the field activities as a way to identify the workfaces at the time of the development of 'execution plans' for field activities. However, since this stage much of the engineering activities are already in progress, or even completed, the likelihood of conflicting strategies, such as choosing to start the installation of piping in areas that do not have availability of design documents or required material is considerably higher. Therefore, this study has the intention to discuss about the use of this practice in the early stages of the detailed engineering phase and show the practical impacts of the application of this concept, showing the results obtained with this strategy in oil refining process plant EPC project carried out by Promon Engineering. (author)

  18. Constructability - from Qinshan to the ACR

    International Nuclear Information System (INIS)

    Elgohary, M.; Fairclough, N.; Ricciuti, R.

    2003-01-01

    AECL has recognised the importance of Constructability for many years and is applying its principals to CANDU projects with increasing success. Constructability is defined as the consideration of construction knowledge and experience during all phases of a project, and recognizes that maximum benefit can be achieved during the concept phases of a project. The CANDU 6 Nuclear Power Plant has been constructed eleven times in the last 25 years, however, the last two units being completed on the Qinshan project in China have employed some very innovative construction methods that have not been used on the previous units. In order to make nuclear power generation more competitive, shorter construction schedules and reduced project costs and risks are essential objectives. The application of constructability principles is a major contributor to achieving these objectives. The success of Qinshan has increased the confidence in the new construction methods which are being implemented on the ACR (Advanced CANDU Reactor) successfully. An ACR construction strategy that utilizes advanced construction techniques has been developed by AECL. The strategy includes paralleling of activities by using extensive modularization and the vertical installation of equipment and modules into the reactor building, using a VHL (Very Heavy Lift) crane. This strategy allows short schedules to be met with a minimum risk to the project. This paper describes the latest construction methods used successfully on the Qinshan CANDU 6 project and looks at the extensive implementation of similar methods for ACR. It is concluded, based on the Qinshan success, that the ACR construction schedule is readily achievable. (author)

  19. Political construction of technology

    International Nuclear Information System (INIS)

    Bruheze, A.A.A. de la.

    1992-01-01

    In the 1970s radioactive waste disposal became a controversial scientific and social issue in the United States, after the US Atomic Energy Commission (AEC) charged with the development, regulation and promotion of nuclear technology, had tried to implement its disposal technology near Lyons, Kansas. This study traces the emergence of this controversy as part of the long-term development of the US radioactive waste disposal technology. Radioactive waste was not always considered a problem, and different meanings were attached to radwaste in the 1940s and early 1950s. Problem definitions and technical designs that underlaid this technology can be reconstructed, and its possible to show how some definitions received attention and others not, and how some became, and remained, dominant. During the process of problem definition, views compete, agendas are built, resources are allocated, and boundaries are created and maintained between 'inside' and 'outside world'. This is a political process, and by heuristically using concepts from political science and recent technology studies, the Political Construction of US radioactive waste disposal technologically can be reconstructed. (author). 301 refs.; 3 figs.; 15 tabs

  20. 46 CFR 108.197 - Construction of accommodation spaces.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Construction of accommodation spaces. 108.197 Section 108.197 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Accommodation Spaces § 108.197 Construction of...

  1. Developmental changes and gender effects on motivational constructs based on the expectancy-value model in Czech and United States students regarding learning of science, mathematics, and other subjects

    Science.gov (United States)

    Yang, Eun-Mi

    This study employed American and Czech student samples to investigate the motivational constructs used in Eccles and Wigfield's (1983) expectancy-value model. To predict achievement behavior, the model specifies relationships among expectancy for-success and task value, task-specific self-concept, perception of task-difficulty, perceptions of social environment, and interpretations and attributions for past events in relation to the social world. Czech and American students (n = 1,145) in grades 4--12 were the participants in this study. The causal relationships among the constructs were tested to investigate structural similarities and differences in the models for both countries. This study also explored developmental changes, gender, and national differences in the students' motivational beliefs for these motivational constructs: Expectancy for Success, Intrinsic Interest Value, Task-specific Self-concept, Perception of Task-difficulty, and Perceived Vocational Gender Dominance for science, mathematics, and other school subjects. The findings indicated that, for both countries, with respect to changes over grade level, compared to the younger students, the older students showed lower motivational beliefs for most subject areas except reading. However, the Czech students in grades 6--8 showed more positive motivational beliefs in life science and social studies than did the Czech students in other grade levels. In comparing genders, the male students exhibited more positive motivational beliefs in physical science than did the female students, and female students showed more positive motivational beliefs in reading than did the male students. For life science, the Czech female students rated Intrinsic Interest Value and Task-specific Self-concept higher than did their peer male students. The American students' motivational beliefs in reading were more positive than were Czech students', and the Czech students held more positive motivational beliefs in life

  2. Interface unit

    NARCIS (Netherlands)

    Keyson, D.V.; Freudenthal, A.; De Hoogh, M.P.A.; Dekoven, E.A.M.

    2001-01-01

    The invention relates to an interface unit comprising at least a display unit for communication with a user, which is designed for being coupled with a control unit for at least one or more parameters in a living or working environment, such as the temperature setting in a house, which control unit

  3. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  4. Improving concrete overlay construction.

    Science.gov (United States)

    2010-03-01

    Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for : construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, ...

  5. Validating MEDIQUAL Constructs

    Science.gov (United States)

    Lee, Sang-Gun; Min, Jae H.

    In this paper, we validate MEDIQUAL constructs through the different media users in help desk service. In previous research, only two end-users' constructs were used: assurance and responsiveness. In this paper, we extend MEDIQUAL constructs to include reliability, empathy, assurance, tangibles, and responsiveness, which are based on the SERVQUAL theory. The results suggest that: 1) five MEDIQUAL constructs are validated through the factor analysis. That is, importance of the constructs have relatively high correlations between measures of the same construct using different methods and low correlations between measures of the constructs that are expected to differ; and 2) five MEDIQUAL constructs are statistically significant on media users' satisfaction in help desk service by regression analysis.

  6. USAID Construction Assessment

    Data.gov (United States)

    US Agency for International Development — The USAID construction assessment is a survey of the character, scope, value and management of construction activities supported by USAID during the period from June...

  7. Organizational Behaviour in Construction

    DEFF Research Database (Denmark)

    Kreiner, Kristian

    2013-01-01

    Review of: Organizational Behaviour in Construction / Anthony Walker (Wiley-Blackwell,2011 336 pp)......Review of: Organizational Behaviour in Construction / Anthony Walker (Wiley-Blackwell,2011 336 pp)...

  8. Construction Sector (NAICS 23)

    Science.gov (United States)

    Find environmental regulatory information for the construction sector, including the construction of buildings or engineering projects. This includes RCRA information for hazardous waste, refrigeration compliance, asbestos, effluent guidelines & lead laws

  9. Construction dust amelioration techniques.

    Science.gov (United States)

    2012-04-01

    Dust produced on seasonal road construction sites in Alaska is both a traffic safety and environmental concern. Dust emanating from : unpaved road surfaces during construction severely reduces visibility and impacts stopping sight distance, and contr...

  10. Skin Problems in Construction

    Science.gov (United States)

    ... you use at work. Find out more about construction hazards. To receive copies of this Hazard Alert ... index.html Physician’s Alert: Occupational Contact Dermatitis Among Construction Workers – give this Alert to your doctor http:// ...

  11. United States housing, first quarter 2013

    Science.gov (United States)

    Delton Alderman

    2014-01-01

    Provides current and historical information on housing market in the United States. Information includes trends for housing permits and starts, housing under construction, and housing completions for single and multifamily units, and sales and construction. This report will be updated regularly.

  12. AUSTA - a self-sufficient environmental analysis station for the analysis of nitrogen, sulfur and carbon compounds. Sub-project: development and construction of the central processing unit for the self-sufficient environmental analysis station. Final report; AUSTA - Autarke Umweltmessstation zur Analyse von Stickstoff-, Schwefel- und Kohlenstoffverbindungen. Teilvorhaben: Entwicklung und Konstruktion der Zentraleinheit fuer die autarke Umweltmessstation. Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Lenk, N.; Ehrling, C.

    2002-07-01

    The aim of the common research project was the development of basics as well as the construction and the testing of a functional model for an environmental analysis system. This system should be able not only to analyze independently environmental toxicologically interesting Carbon, Nitrogen and Sulfur species from watery samples, but also to evaluate and document the results of the analysis. A functional model for the determination of TC/TN and the species TIC, Nitrate, Nitrite, Ammonium, Sulfite and Sulfide from an aqueous matrix, was built and tested successfully in the laboratory. The functional model was realized in a modular construction. Micro system technical components were integrated into the system. The dosage of samples and standards as well as the sample preparation for the determination of Nitrate is carried out via a special own-developed control module. The construction of the combustion unit with reactors and the appendant technique for joining parts was carried out in a miniaturization, not realized up to now. (orig.)

  13. Construction and Demolition Waste

    DEFF Research Database (Denmark)

    Christensen, Thomas Højlund; Andersen, L.

    2011-01-01

    Construction and demolition waste (C&D waste) is the waste generated during the building, repair, remodeling or removal of constructions. The constructions can be roads, residential housing and nonresidential buildings. C&D waste has traditionally been considered without any environmental problems...

  14. A Duplicate Construction Experiment.

    Science.gov (United States)

    Bridgeman, Brent

    This experiment was designed to assess the ability of item writers to construct truly parallel tests based on a "duplicate-construction experiment" in which Cronbach argues that if the universe description and sampling are ideally refined, the two independently constructed tests will be entirely equivalent, and that within the limits of item…

  15. Safety in construction industry

    International Nuclear Information System (INIS)

    Khan, A.M.

    1979-01-01

    Causative factors of accidents in construction industry in the context of experience of construction work of the Rajasthan Atomic Power Project are enumerated. The aspect of accident cost - direct and indirect - is discussed briefly. Setting up of a safety set-up at construction sites is emphasized and principles which should guide the accident prevention programme are spelt out. (M.G.B.)

  16. Optimal design of compact organic Rankine cycle units for domestic solar applications

    Directory of Open Access Journals (Sweden)

    Barbazza Luca

    2014-01-01

    Full Text Available Organic Rankine cycle turbogenerators are a promising technology to transform the solar radiation harvested by solar collectors into electric power. The present work aims at sizing a small-scale organic Rankine cycle unit by tailoring its design for domestic solar applications. Stringent design criteria, i. e., compactness, high performance and safe operation, are targeted by adopting a multi-objective optimization approach modeled with the genetic algorithm. Design-point thermodynamic variables, e. g., evaporating pressure, the working fluid, minimum allowable temperature differences, and the equipment geometry, are the decision variables. Flat plate heat exchangers with herringbone corrugations are selected as heat transfer equipment for the preheater, the evaporator and the condenser. The results unveil the hyperbolic trend binding the net power output to the heat exchanger compactness. Findings also suggest that the evaporator and condenser minimum allowable temperature differences have the largest impact on the system volume and on the cycle performances. Among the fluids considered, the results indicate that R1234yf and R1234ze are the best working fluid candidates. Using flat plate solar collectors (hot water temperature equal to 75 °C, R1234yf is the optimal solution. The heat exchanger volume ranges between 6.0 and 23.0 dm3, whereas the thermal efficiency is around 4.5%. R1234ze is the best working fluid employing parabolic solar collectors (hot water temperature equal to 120 °C. In such case the thermal efficiency is around 6.9%, and the heat exchanger volume varies from 6.0 to 18.0 dm3.

  17. Design of methodology for incremental compiler construction

    Directory of Open Access Journals (Sweden)

    Pavel Haluza

    2011-01-01

    Full Text Available The paper deals with possibilities of the incremental compiler construction. It represents the compiler construction possibilities for languages with a fixed set of lexical units and for languages with a variable set of lexical units, too. The methodology design for the incremental compiler construction is based on the known algorithms for standard compiler construction and derived for both groups of languages. Under the group of languages with a fixed set of lexical units there belong languages, where each lexical unit has its constant meaning, e.g., common programming languages. For this group of languages the paper tries to solve the problem of the incremental semantic analysis, which is based on incremental parsing. In the group of languages with a variable set of lexical units (e.g., professional typographic system TEX, it is possible to change arbitrarily the meaning of each character on the input file at any time during processing. The change takes effect immediately and its validity can be somehow limited or is given by the end of the input. For this group of languages this paper tries to solve the problem case when we use macros temporarily changing the category of arbitrary characters.

  18. TPX tokamak construction management

    International Nuclear Information System (INIS)

    Knutson, D.; Kungl, D.; Seidel, P.; Halfast, C.

    1995-01-01

    A construction management contract normally involves the acquisition of a construction management firm to assist in the design, planning, budget conformance, and coordination of the construction effort. In addition the construction management firm acts as an agent in the awarding of lower tier contracts. The TPX Tokamak Construction Management (TCM) approach differs in that the construction management firm is also directly responsible for the assembly and installation of the tokamak including the design and fabrication of all tooling required for assembly. The Systems Integration Support (SIS) contractor is responsible for the architect-engineering design of ancillary systems, such as heating and cooling, buildings, modifications and site improvements, and a variety of electrical requirements, including switchyards and >4kV power distribution. The TCM will be responsible for the procurement of materials and the installation of the ancillary systems, which can either be performed directly by the TCM or subcontracted to a lower tier subcontractor. Assurance that the TPX tokamak is properly assembled and ready for operation when turned over to the operations team is the primary focus of the construction management effort. To accomplish this a disciplined constructability program will be instituted. The constructability effort will involve the effective and timely integration of construction expertise into the planning, component design, and field operations. Although individual component design groups will provide liaison during the machine assembly operations, the construction management team is responsible for assembly

  19. Sustainable construction: construction and demolition waste reconsidered.

    Science.gov (United States)

    del Río Merino, Mercedes; Izquierdo Gracia, Pilar; Weis Azevedo, Isabel Salto

    2010-02-01

    Construction activity in Europe has increased substantially in the past decade. Likewise, there has also been a commensurate rise in the generation of construction and demolition waste (C&DW). This, together with the fact that in many European countries the rate of recycling and reuse of C&DW is still quite low has engendered a serious environmental problem and a motivation to develop strategies and management plans to solve it. Due to its composition, there is a significant potential to reuse and/or recycle C&DW, and thereby, contribute to improving the sustainability of construction and development, but practical procedures are not yet widely known or practiced in the construction industry. This article (a) summarizes the different applications that are presently practiced to optimize the recovery and/or application of C&DW for reuse, and (b) proposes various measures and strategies to improve the processing of this waste. The authors suggest that to enhance environmental effectiveness, a conscious and comprehensive C&DW management plan should be implemented in each jurisdiction. More precisely, this study presents a holistic approach towards C&DW management, through which environmental benefits can be achieved through the application of new construction methods that can contribute to sustainable growth.

  20. Towards green construction

    International Nuclear Information System (INIS)

    Bajracharya, Bijaya B.; Shrestha, Prasanna M.

    2000-01-01

    Sustainability is the key to any development works. In the operation phase, hydro power is the most sustainable form of energy. However construction activities for the same power station are usually far from being green. The popular myth is that construction activity converts green into grey. Despite this popular myth, construction of a hydro power project in Nepal has made the project area greener than earlier during the construction phase itself. Choice of construction technology, appropriate level of environmental impact assessment, monitoring of environmental parameters along side the construction progress followed by mitigation at the right time; launching community development programmes side by side, having environmental specification in contractual documents and self-reliance to fulfill environmental obligations by contractors itself are the key factors in the environmental management within the construction activities. The main conclusions in the paper is the need to change the way to think about the project constraints

  1. Construction plant requirements for nuclear sites

    International Nuclear Information System (INIS)

    Tatum, C.B.; Harris, J.A.

    1981-01-01

    Planning and developing the temporary construction plant facilities for a nuclear project is equivalent to providing utility services for a small city. Provision of adequate facilities is an important factor in the productivity of both the manual and non-manual work force. This paper summarizes construction facility requirements for a two unit (1300 MWe each) nuclear project. Civil, mechanical and electrical facilities are described, including design, installation and operation. Assignment of responsibility for specific work tasks regarding the construction plant is also discussed. In presenting this data, the authors seek to transfer experience and assist in the provision of adequate facilities on future projects

  2. Introduction to Drywall. Instructor Edition. Introduction to Construction Series.

    Science.gov (United States)

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This instructor's guide contains the materials required to teach a competency-based introductory course in drywalling to students who have chosen to explore careers in construction. It contains three units: drywall materials, drywall tools, and applied skills. Each instructional unit includes some or all of the basic components of a unit of…

  3. Construction of an infectious cDNA clone of avian hepatitis E virus (avian HEV) recovered from a clinically healthy chicken in the United States and characterization of its pathogenicity in specific-pathogen-free chickens.

    Science.gov (United States)

    Kwon, Hyuk Moo; LeRoith, Tanya; Pudupakam, R S; Pierson, F William; Huang, Yao-Wei; Dryman, Barbara A; Meng, Xiang-Jin

    2011-01-27

    A genetically distinct strain of avian hepatitis E virus (avian HEV-VA strain) was isolated from a healthy chicken in Virginia, and thus it is important to characterize and compare its pathogenicity with the prototype strain (avian HEV-prototype) isolated from a diseased chicken. Here we first constructed an infectious clone of the avian HEV-VA strain. Capped RNA transcripts from the avian HEV-VA clone were replication-competent after transfection of LMH chicken liver cells. Chickens inoculated intrahepatically with RNA transcripts of avian HEV-VA clone developed active infection as evidenced by fecal virus shedding, viremia, and seroconversion. To characterize the pathogenicity, RNA transcripts of both avian HEV-VA and avian HEV-prototype clones were intrahepatically inoculated into the livers of chickens. Avian HEV RNA was detected in feces, serum and bile samples from 10/10 avian HEV-VA-inoculated and 9/9 avian HEV-prototype-inoculated chickens although seroconversion occurred only in some chickens during the experimental period. The histopathological lesion scores were lower for avian HEV-VA group than avian HEV-prototype group in the liver at 3 and 5 weeks post-inoculation (wpi) and in the spleen at 3 wpi, although the differences were not statistically significant. The liver/body weight ratio, indicative of liver enlargement, of both avian HEV-VA and avian HEV-prototype groups were significantly higher than that of the control group at 5 wpi. Overall, the avian HEV-VA strain still induces histological liver lesions even though it was isolated from a healthy chicken. The results also showed that intrahepatic inoculation of chickens with RNA transcripts of avian HEV infectious clone may serve as an alternative for live virus in animal pathogenicity studies. Copyright © 2010 Elsevier B.V. All rights reserved.

  4. Construction time of PWRs

    International Nuclear Information System (INIS)

    Moreira, João M.L.; Gallinaro, Bruno; Carajilescov, Pedro

    2013-01-01

    The construction time of PWRs is studied considering published data about nuclear power plants in the world. For the 268 PWRs in operation in 2010, the mode of the construction time distribution is around 5–6 years, and 80% of the plants were built in less than 120 months. To circumvent the problem of comparing plants with different size we normalized the construction time to plants with 1 GW. We restricted the analysis to 201 PWRs which suffered less from external factors that were beyond the control of the management from 1965 to 2010. The results showed that the normalized construction time did not increase over the years and nor with the plants’ gross power level. The learning rate of the industry regarding normalized construction times showed a reduction with 95% confidence level of about 0.56±0.07 months for each 10 GW of installed capacity. Over the years the normalized construction time decreased and became more predictable. The data showed that countries with more centralized regulatory, construction and operation environments were able to build PWRs in shorter times. Countries less experienced with the nuclear technology built PWRs in longer times. - Highlights: ► The construction time of PWRs is analyzed based on historical data. ► Different factors affecting construction time are considered in the analyses. ► The normalized construction time of PWRs decreased with time and gross power level. ► Countries with more centralized institutions built PWRs more quickly

  5. Development of a PI fuzzy-neural control of two freedom degrees, applied to the velocity control of a turbo-gas unit; Desarrollo de un control PI neurodifuso no lineal de dos grados de libertad, aplicado al control de velocidad de una unidad turbogas

    Energy Technology Data Exchange (ETDEWEB)

    Castelo C, Luis; Garduno R, Raul [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Marmol M, Enrique Q [Cento Nacional de Investigacion y Desarrollo Tecnologico (Cenidet), Cuernavaca, Morelos (Mexico)

    2005-07-01

    The Instituto de Investigaciones Electricas has developed and implemented control systems in power stations with turbo gas unit (TGU) and of combined cycle power plants in which it has been detected several necessities and opportunities of technological development. One of most important is the improvement of the strategies of velocity control, power and temperature of the TGU, in order to obtain a safer and profitable operation. Since these units demand a strict and greater number of control requirements, because they are characterized by operating at temperatures, pressures and velocities higher than those of another type of units. An alternative to improve the control strategies of the TGU is the use of other control structures and the use of control techniques with diffuse logic, which can surpass the disadvantages of the conventional control. Due to the former, the reliability requirements of the TGU to get on line without fault, when required, have remarkably increased. The frequent accomplishment of starts, synchronization, load takings and shut-downs in a successful way and in automatic form, strongly depend on the capacities of the control system. During the starting, the main task of the control system consists of accelerating to the turbo-generator from the turn-shaft velocity to the nominal velocity according to a predefined acceleration pattern. The velocity control generates the control actions to accelerate the turbo-generator in a safe way that avoids the occurrence of instabilities of the working fluid, vibration discharges and resonances, high temperatures and combustion instabilities, and in addition, in the minimum of time, with fuel saving and preserving the useful life of the turbo-generator. [Spanish] El Instituto de Investigaciones Electricas ha desarrollado e implantado sistemas de control en centrales con unidad turbo gas (UTG) y centrales de ciclo combinado en las que se ha detectado varias necesidades y oportunidades de desarrollo

  6. Space construction technology needs

    Science.gov (United States)

    Jenkins, L. M.

    1981-01-01

    Space construction systems made feasible by an operational Space Shuttle are discussed with a view toward assembly, installation and construction support equipment. The level of construction capability will be reflected in the number of launches to accomplish a certain mission, either in terms of the mission time line or on the density of packaging in the Orbiter payload bay. It is noted that the development of construction support equipment in zero-gravity simulations should be the most productive initial activity. Crew EVAs, as well as the beam builder, cherrypicker and power distribution buses are covered in detail.

  7. Neural network construction via back-propagation

    International Nuclear Information System (INIS)

    Burwick, T.T.

    1994-06-01

    A method is presented that combines back-propagation with multi-layer neural network construction. Back-propagation is used not only to adjust the weights but also the signal functions. Going from one network to an equivalent one that has additional linear units, the non-linearity of these units and thus their effective presence is then introduced via back-propagation (weight-splitting). The back-propagated error causes the network to include new units in order to minimize the error function. We also show how this formalism allows to escape local minima

  8. Constructing a Tibetan Demos in Exile

    DEFF Research Database (Denmark)

    Brox, Trine

    2012-01-01

    homeland. Two specific instances of the construction of a transnational exile demos are investigated: citizenship and political representation. The Tibetan Government-in-Exile's formalized idea of citizenship builds upon ideals of equal and loyal members who form a single unit bounded by a common cause...

  9. Fabulous Facilities: New Constructions and Renovations.

    Science.gov (United States)

    American Libraries, 1997

    1997-01-01

    Renovation and construction projects in 18 public and academic libraries across the United States are showcased, with 23 photographs illustrating library interiors and exteriors. Discussion centers on architecture, costs, technology infrastructure and equipment, preservation of old facilities, furniture, and library functions. (AEF)

  10. Construction Cluster Volume I [Wood Structural Framing].

    Science.gov (United States)

    Pennsylvania State Dept. of Justice, Harrisburg. Bureau of Correction.

    The document is the first of a series, to be integrated with a G.E.D. program, containing instructional materials at the basic skills level for the construction cluster. It focuses on wood structural framing and contains 20 units: (1) occupational information; (2) blueprint reading; (3) using leveling instruments and laying out building lines; (4)…

  11. Hitachi's experience and achievements in ABWR construction

    International Nuclear Information System (INIS)

    Inoue, Takashi; Miura, Jun; Murayama, Kouichi

    2003-01-01

    Hitachi, Ltd. (Hitachi) is taking charge of the turbine island of Chubu Electric Power Company's Hamaoka nuclear power plant Unit No. 5 (Hamaoka 5), and all facilities of Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2). Hitachi has achieved shorter schedules and lower costs in the two projects with the following construction methods. First, Hitachi applied modularization and the area-by-area method. These methods enable us to undertake building and installation work in parallel. Second, the floor packaging construction method enables us to finish installation in every area earlier than conventional methods. Moreover, manpower can be distributed evenly. This paper reports the application of these advanced construction methods to the Hamaoka 5 and Shika 2 projects. Installations such as RCCV modules and condenser blocks are presented in this paper. In addition, Hitachi is using 3D-CAD engineering and our own construction management system to optimize the planning of construction procedures and the installation of equipment in these projects. Thus Hitachi is always striving to improve the reliability, safety and economy of ABWR construction technologies. (author)

  12. Nuclear reactor constructions

    International Nuclear Information System (INIS)

    Baddley, A.H.

    1981-01-01

    A method of constructing a radiation shielding plug for use in the roof of the coolant containment vault of liquid metal cooled fast breeder reactors is described. The construction allows relative movement of that part of service cables and pipes which are carried by the fixed roof and that part which is carried by the rotatable plug. (U.K.)

  13. Personal Usability Constructs

    DEFF Research Database (Denmark)

    Hertzum, Morten; Clemmensen, Torkil; Hornbæk, Kasper

    2011-01-01

    Whereas the concept of usability is predominantly defined analytically, people relate to systems through personal usability constructs. Based on 48 repertory-grid interviews, this study investigates how such personal constructs are affected by two factors crucial to the international development...

  14. Wall Construction; Carpentry: 901892.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course designed to provide instruction in floor and wall layout, and in the diverse methods and construction of walls. Upon completion of this course the students should have acquired a knowledge of construction plans and structural foundations in addition to a basic knowledge of mathematics. The course consists of…

  15. INDOT Construction Inspection Priorities

    Science.gov (United States)

    2012-05-01

    In the last decade, the Indiana Department of Transportation (INDOT) has experienced an increase in their construction projects (e.g., INDOTs : construction spending was $789 million in 2006 and increased to $1,081.4 million in 2010); while the le...

  16. VENTILATION NEEDS DURING CONSTRUCTION

    International Nuclear Information System (INIS)

    C.R. Gorrell

    1998-01-01

    The purpose of this analysis is to determine ventilation needs during construction and development of the subsurface repository and develop systems to satisfy those needs. For this analysis, construction is defined as pre-emplacement excavation and development is excavation that takes place simultaneously with emplacement. The three options presented in the ''Overall Development and Emplacement Ventilation Systems'' analysis (Reference 5.5) for development ventilation will be applied to construction ventilation in this analysis as well as adding new and updated ventilation factors to each option for both construction and development. The objective of this analysis is to develop a preferred ventilation system to support License Application Design. The scope of this analysis includes: (1) Description of ventilation conditions; (2) Ventilation factors (fire hazards, dust control, construction logistics, and monitoring and control systems); (3) Local ventilation alternatives; (4) Global ventilation options; and (5) Evaluation of options

  17. Professional entrepreneurial identity construction

    DEFF Research Database (Denmark)

    Ramsgaard, Michael Breum

    The present study investigates the construction of a professional identity as an entrepreneur in a sample of people with educational background in nutrition and health. The study examines the connection between professional identity construction and entrepreneurial business emergence using ‘entre...... ‘entrepreneurial preparedness’ as parameter. This research seeks to address the following questions: What significant components or characteristics do entrepreneurs rely on in the early processes of constructing an entrepreneurial identity.......The present study investigates the construction of a professional identity as an entrepreneur in a sample of people with educational background in nutrition and health. The study examines the connection between professional identity construction and entrepreneurial business emergence using...

  18. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  19. Governmentalities of Construction

    DEFF Research Database (Denmark)

    Gottlieb, Stefan; Jensen, Jens Stissing

    2016-01-01

    In this paper, we apply Foucault’s concept of governmentality in a dual analysis of the formation and transformation of the construction sector and the construction worker. The governmentality concept is well-suited for such an analysis as it directs attention to the ways in which control...... is the exercised over a specific area of institutional life through the shaping of individuals’ conduct. We argue that construction, as a coherent sector, first was rendered governable in the 1940s in order to achieve national modernisation. It is shown how the political measures that were based on the exercise...... of disciplinary power also impacted the formation of identities constituting the construction worker as a normalised subject. We then illustrate how construction since the mid-1990s has been shaped by two contrasting governmentalities framing the sector as respectively a resource area, with emphasis on innovation...

  20. Generating Units

    Data.gov (United States)

    Department of Homeland Security — Generating Units are any combination of physically connected generators, reactors, boilers, combustion turbines, and other prime movers operated together to produce...

  1. Construction in Occupied Spaces

    Science.gov (United States)

    Ward, Andrew E.; Azhar, Salman; Khalfan, Malik

    2017-06-01

    Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  2. New NPP Construction Experience in Finland

    International Nuclear Information System (INIS)

    Alm-Lytz, K.

    2016-01-01

    The paper discusses the experiences of the new nuclear power plant construction projects. The topics include the licensing and regulatory oversight process, completion of the design prior to construction, experience and know-how of the participating organisations, quality management in a nuclear construction project, safety culture aspects in a nuclear construction project, and the role and importance of regulator’s oversight. Finland has recent experience of new nuclear power plant construction, one plant unit being under construction close to commissioning phase and one plant unit in construction license phase. Each nation is solely responsible for the safety of its nuclear installations. Therefore, there are also national practices how nuclear power plants are licensed and how the safety and quality of these plants are verified during construction and operation. Differences in licensing, regulations and regulatory practices may have an impact on the design of the plant. There may be differences in how the detailed design has to be documented and how and when it needs to be submitted for approval to the regulator. To avoid surprises due to differences, it is beneficial for the owner and plant vendor to familiarize themselves early enough on the national practices and regulations to ensure that regulatory expectations and processes can be taken into account in the project implementation. In addition, the owner and the plant vendor have to understand what are the national safety goals and safety requirements that the plant has to fulfil, and what they mean to the detailed design of the plant. These have to be clarified and explicitly defined by the owner in terms of design criteria in the bidding documentation to avoid difficulties in the future steps of the project.

  3. Sustainability Base Construction Update

    Science.gov (United States)

    Mewhinney, Michael

    2012-01-01

    Construction of the new Sustainability Base Collaborative support facility, expected to become the highest performing building in the federal government continues at NASA's Ames Research Center, Moffet Field, Calif. The new building is designed to achieve a platinum rating under the leadership in Energy and Environment Design (LEED) new construction standards for environmentally sustainable construction developed by the U. S. Green Building Council, Washington, D. C. When completed by the end of 2011, the $20.6 million building will feature near zero net energy consumption, use 90 percent less potable water than conventionally build buildings of equivalent size, and will result in reduced building maintenance costs.

  4. UNIT, TIBET.

    Science.gov (United States)

    Louisiana Arts and Science Center, Baton Rouge.

    THE UNIT OF STUDY DESCRIBED IN THIS BOOKLET DEALS WITH THE GEOGRAPHY AND HISTORY OF TIBET. THE UNIT COVERS SOME OF THE GENERAL FEATURES OF THE COUNTRY AND THEIR EFFECT UPON THE LIVES OF THE TIBETAN PEOPLE. DISCUSSION QUESTIONS ARE INSERTED TO STIMULATE THOUGHT. THE RELIGION OF TIBET IS DISCUSSED IN RELATION TO ITS INFLUENCE ON THE ART AND CULTURE…

  5. Infection control in design and construction work.

    Science.gov (United States)

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  6. Self-Organized Construction with Continuous Building Material

    DEFF Research Database (Denmark)

    Heinrich, Mary Katherine; Wahby, Mostafa; Divband Soorati, Mohammad

    2016-01-01

    Self-organized construction with continuous, structured building material, as opposed to modular units, offers new challenges to the robot-based construction process and lends the opportunity for increased flexibility in constructed artifact properties, such as shape and deformation. As an example...... be extended by using different materials and by embedding sensors during the self-organized construction directly into the braided structure. In future work, we plan to apply dedicated braiding robot hardware and to construct sophisticated 3-d structures with local variability in patterns of filament...... investigation, we look at continuous filaments organized into braided structures, within the context of bio-hybrids constructing architectural artifacts. We report the result of an early swarm robot experiment. The robots successfully constructed a braid in a self-organized process. The construction process can...

  7. 75 FR 32313 - Specifications and Drawings for Construction Direct Buried Plant

    Science.gov (United States)

    2010-06-08

    ... construction units for Fiber-to-the-Home, remove redundant or outdated requirements, and simplify the.... Because of Fiber-to-the-Home construction and advancements made in construction installation methods and... Construction Direct Buried Plant AGENCY: Rural Utilities Service, USDA. ACTION: Proposed Rule. SUMMARY: The...

  8. Application and Mechanics Analysis of Multi-Function Construction Platforms in Prefabricated-Concrete Construction

    Science.gov (United States)

    Wang, Meihua; Li, Rongshuai; Zhang, Wenze

    2017-11-01

    Multi-function construction platforms (MCPs) as an “old construction technology, new application” of the building facade construction equipment, its efforts to reduce labour intensity, improve labour productivity, ensure construction safety, shorten the duration of construction and other aspects of the effect are significant. In this study, the functional analysis of the multi-function construction platforms is carried out in the construction of the assembly building. Based on the general finite element software ANSYS, the static calculation and dynamic characteristics analysis of the MCPs structure are analysed, the simplified finite element model is constructed, and the selection of the unit, the processing and solution of boundary are under discussion and research. The maximum deformation value, the maximum stress value and the structural dynamic characteristic model are obtained. The dangerous parts of the platform structure are analysed, too. Multiple types of MCPs under engineering construction conditions are calculated, so as to put forward the rationalization suggestions for engineering application of the MCPs.

  9. Nuclear power plant construction

    International Nuclear Information System (INIS)

    Lima Moreira, Y.M. de.

    1979-01-01

    The legal aspects of nuclear power plant construction in Brazil, derived from governamental political guidelines, are presented. Their evolution, as a consequence of tecnology development is related. (A.L.S.L.) [pt

  10. Employment and winter construction

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Larsen, Jacob Norvig

    2011-01-01

    Reduced seasonal building activity in the construction sector is often assumed to be related to hard winter conditions for building activities and poor working conditions for construction workers, resulting in higher costs and poor quality of building products, particularly in the northern...... hemisphere. Can climatic conditions alone explain the sizeable difference in reduction in building activity in the construction sector in European countries in the winter months, or are other factors such as technology, economic cycles and schemes for financial compensation influential as well? What...... possibilities exist for reducing seasonal variation in employment? In addition to a literature review related to winter construction, European and national employment and meteorological data were studied. Finally, ministerial acts, ministerial orders or other public policy documents related to winter...

  11. Ship construction and welding

    CERN Document Server

    Mandal, Nisith R

    2017-01-01

    This book addresses various aspects of ship construction, from ship types and construction materials, to welding technologies and accuracy control. The contents of the book are logically organized and divided into twenty-one chapters. The book covers structural arrangement with longitudinal and transverse framing systems based on the service load, and explains basic structural elements like hatch side girders, hatch end beams, stringers, etc. along with structural subassemblies like floors, bulkheads, inner bottom, decks and shells. It presents in detail double bottom construction, wing tanks & duct keels, fore & aft end structures, etc., together with necessary illustrations. The midship sections of various ship types are introduced, together with structural continuity and alignment in ship structures. With regard to construction materials, the book discusses steel, aluminum alloys and fiber reinforced composites. Various methods of steel material preparation are discussed, and plate cutting and form...

  12. Passive solar construction handbook

    Energy Technology Data Exchange (ETDEWEB)

    Levy, E.; Evans, D.; Gardstein, C.

    1981-08-01

    Many of the basic elements of passive solar design are reviewed. The unique design constraints presented in passive homes are introduced and many of the salient issues influencing design decisions are described briefly. Passive solar construction is described for each passive system type: direct gain, thermal storage wall, attached sunspace, thermal storage roof, and convective loop. For each system type, important design and construction issues are discussed and case studies illustrating designed and built examples of the system type are presented. Construction details are given and construction and thermal performance information is given for the materials used in collector components, storage components, and control components. Included are glazing materials, framing systems, caulking and sealants, concrete masonry, concrete, brick, shading, reflectors, and insulators. The Load Collector Ratio method for estimating passive system performance is appended, and other analysis methods are briefly summarized. (LEW)

  13. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  14. Lead in Construction

    National Research Council Canada - National Science Library

    1993-01-01

    Although Occupational Safety and Health Administration (OSHA) regulations for occupational lead exposure have been in effect since 1971 for the construction and general industries, the agency regulations for general industry in 1978...

  15. Schildberg Construction Company, Inc.

    Science.gov (United States)

    The EPA is providing notice of a proposed Administrative Penalty Assessment against the Schildberg Construction Company, Inc. for alleged violations at its locations at 1605 218th Avenue, Osceola, IA 50213 and 34466 Elkhorn Trail, Graham, MO 64455.

  16. Caltrans : construction manual

    Science.gov (United States)

    2009-08-01

    Caltrans intends this manual as a resource for all personnel engaged in contract administration. The manual establishes policies and procedures for the construction phase of Caltrans projects. However, this manual is not a contract document. It impos...

  17. Construction and material specification

    Science.gov (United States)

    2002-01-01

    These Construction and Material Specifications are written to the Bidder before award of the : Contract and to the Contractor after award of the Contract. The sentences that direct the Contractor to perform Work are written as commands. For example, ...

  18. Wage Leadership in Construction.

    Science.gov (United States)

    1981-01-01

    LEADERSHIP IN CONSTRUCTION Wage leadership is the theory that wage increases in one sector lead to imitative increases elsewhere. In this paper we...test this theory in a large industry where wage leadership is supposed to be dominant- construction. Alternate theories of wage determination (excess...demand, real wage bargaining) are also tested, along with %he efficacy of the 1971-73 wagecotls BACKGROUND The theory of wage leadership is an important

  19. Quality during construction

    International Nuclear Information System (INIS)

    Rogers, C.B.

    1977-01-01

    This paper outlines the quality assurance program used by Bechtel Corp. in constructing Nuclear Power Plants. As a tool for scheduling and visualizing situations during construction, power plant scale models are used. The use of models, preplanning, detail scheduling, and early development of procedures and inspection plans, have all contributed to a lower cost integrated quality program. Quality control and quality assurance are built in, thus satisfying the regulatory requirements

  20. Constructive Consumer Choice Processes.

    OpenAIRE

    Bettman, James R; Luce, Mary Frances; Payne, John W

    1998-01-01

    Consumer decision making has been a focal interest in consumer research, and consideration of current marketplace trends ( e.g., technological change, an information explosion) indicates that this topic will continue to be critically important. We argue that consumer choice is inherently constructive. Due to limited processing capacity, consumers often do not have well-defined existing preferences, but construct them using a variety of strategies contingent on task demands. After describing c...

  1. Runaway cultural niche construction

    Science.gov (United States)

    Rendell, Luke; Fogarty, Laurel; Laland, Kevin N.

    2011-01-01

    Cultural niche construction is a uniquely potent source of selection on human populations, and a major cause of recent human evolution. Previous theoretical analyses have not, however, explored the local effects of cultural niche construction. Here, we use spatially explicit coevolutionary models to investigate how cultural processes could drive selection on human genes by modifying local resources. We show that cultural learning, expressed in local niche construction, can trigger a process with dynamics that resemble runaway sexual selection. Under a broad range of conditions, cultural niche-constructing practices generate selection for gene-based traits and hitchhike to fixation through the build up of statistical associations between practice and trait. This process can occur even when the cultural practice is costly, or is subject to counteracting transmission biases, or the genetic trait is selected against. Under some conditions a secondary hitchhiking occurs, through which genetic variants that enhance the capability for cultural learning are also favoured by similar dynamics. We suggest that runaway cultural niche construction could have played an important role in human evolution, helping to explain why humans are simultaneously the species with the largest relative brain size, the most potent capacity for niche construction and the greatest reliance on culture. PMID:21320897

  2. Comparative constructions in old Romanian

    Directory of Open Access Journals (Sweden)

    Raluca Brăescu

    2017-09-01

    Full Text Available In this paper, we analyse degree adjectival constructions in old Romanian texts. We focus on the comparative of superiority, taking into account in the first place the grammaticalization stage of the degree markers. The structures from the old texts contain polyfunctional units in competition; some of them enter a complex process of specialisation (mai ‘more’, while others disappear (camai. Afterwards, we focus on the realizations of the comparative complement in the corpus analysed: prepositional phrases headed by the prepositions ca, decît, de ‘than’. We want to see if we can establish any constraints in the use of these prepositions. We pay attention to the word order disharmonies encountered in the old texts. The configurations with pre-adjectival complements are related to the existence of certain relics of the non-configurational syntax in old Romanian.

  3. Analysis and evaluation of post construction failures of airport apron ...

    African Journals Online (AJOL)

    A new apron pavement for parking aircrafts was constructed in 2014, but major depressions occurred when used by aircrafts soon after the construction. Failure analysis revealed structural design inconsistent with the United States Federal Aviation Administration Design Code AC 150-5320-6E. The methodologies for the ...

  4. Design, Construction and Measured Performance of a Single-Stage ...

    African Journals Online (AJOL)

    The design philosophy, construction and measured performances of a single stage, single entry centrifugal pump demonstration unit are presented. In the construction, close-coupled induction motor drives the centrifugal pump, which draws fluid (water) from a water storage tank and delivers same through a flow control ...

  5. 26 CFR 1.958-2 - Constructive ownership of stock.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 10 2010-04-01 2010-04-01 false Constructive ownership of stock. 1.958-2... TAX (CONTINUED) INCOME TAXES Controlled Foreign Corporations § 1.958-2 Constructive ownership of stock...), to treat the stock of a domestic corporation as owned by a United States shareholder of a controlled...

  6. Constructing the illness narrative

    DEFF Research Database (Denmark)

    Egerod, Ingrid; Christensen, Doris; Schwartz-Nielsen, Katherine Hvid

    2011-01-01

    After a stay in the intensive care unit, patients risk experiencing delusional memories, memory loss, and symptoms of posttraumatic stress. Since the 1990s, diaries have been kept for intensive care unit patients to help fill in memory gaps, aid psychosocial recovery, and improve health...

  7. Hard-Hat Detection for Construction Safety Visualization

    OpenAIRE

    Shrestha, Kishor; Shrestha, Pramen P.; Bajracharya, Dinesh; Yfantis, Evangelos A.

    2015-01-01

    In 2012, 775 fatalities were recorded, and many more were injured at construction sites in the United States. Of these, 415 fatalities (54%) were due to fall, slips, and trips as well as being struck by falling objects. In order to decrease fatalities at construction sites to these types of events, the Occupational Safety and Health Administration (OSHA) provides Fall Prevention and OSHA-10 trainings to construction workers. Moreover, safety personnel monitor whether the workers use personal ...

  8. A study of the Naval Construction Force project material supply chain

    OpenAIRE

    Stasick, Steven J.

    2004-01-01

    The Naval Construction Force (NCF) performs construction projects in all areas of the world during both peacetime and war. While some of these projects occur in populated areas where project materials are readily available, many of these projects occur in remote areas or war zones, where project materials must be procured from the United States or elsewhere and shipped to the unit performing the construction. The construction scopes also vary from projects as small as concrete sidewalks to pr...

  9. Turnley Unit

    Data.gov (United States)

    Federal Laboratory Consortium — Facilities at this unit include cattle working pens, hydraulic squeeze chute and electronic scale, a maintenance building, and four hay storage sheds. There is one...

  10. Detector Unit

    CERN Multimedia

    1960-01-01

    Original detector unit of the Instituut voor Kernfysisch Onderzoek (IKO) BOL project. This detector unit shows that silicon detectors for nuclear physics particle detection were already developed and in use in the 1960's in Amsterdam. Also the idea of putting 'strips' onto the silicon for high spatial resolution of a particle's impact on the detector were implemented in the BOL project which used 64 of these detector units. The IKO BOL project with its silicon particle detectors was designed, built and operated from 1965 to roughly 1977. Detector Unit of the BOL project: These detectors, notably the ‘checkerboard detector’, were developed during the years 1964-1968 in Amsterdam, The Netherlands, by the Natuurkundig Laboratorium of the N.V. Philips Gloeilampen Fabrieken. This was done in close collaboration with the Instituut voor Kernfysisch Onderzoek (IKO) where the read-out electronics for their use in the BOL Project was developed and produced.

  11. The Construction and Operation of Some Examples of Merging Unit

    Directory of Open Access Journals (Sweden)

    Kamil Gontarz

    2014-03-01

    Full Text Available The paper describes schemes of modern digital protection automation devices using Ethernet technology as the main medium of exchange of information, which allows building a communication architecture for a power system, using all aspects of the IEC 61850 standard.

  12. Análisis de la redundancia en la generación de vapor con parámetros inferiores en un monobloque de 64 MW // Analysis of redundancy in the steam generation with inferior parameters in an unit of 64 MW.

    Directory of Open Access Journals (Sweden)

    A. Paneque Matos

    2000-10-01

    use the boiler of one unit to feed the another one turbogenerator. In thepresent work, the corresponding calculations to determine the behavior of the turbine under the new imposed conditionsare shown, it was carried out an analysis of reliability of the proposed system using the simulation like a tool for modelingthe process.Key words: thermoelectric plant, reliability, efficiency, steam turbine, boiler.

  13. Construction time of PWRs

    International Nuclear Information System (INIS)

    Carajilescov, Pedro; Moreira, Joao M.L.

    2011-01-01

    The cost of electricity generated by nuclear power is greatly affected by the capital cost, which is dependent on the construction time of the plant. This work analyses the construction time of PWRs in several countries with different market structure and licensing experience. Countries which succeeded to establish a more collaborative environment among utilities, constructors, regulators, and energy planners through effective partnerships were able to build PWRs in shorter times. The construction time in Germany, France and Russia was around 80 months and in Japan, about 60 months. The envelope of 95% of the cases includes a range between 50 and 250 months of construction time. The evaluations show that construction time of PWRs has been longer for countries that did not hold the technology to build their own reactors, and depended on contracts with foreign suppliers. The nominal power of the reactors was considered a measure of plant size, technology complexity and standardization. Countries with standardized reactor designs (France, Japan and Russia) were able to build plants in shorter times. (author)

  14. Construction time of PWRs

    Energy Technology Data Exchange (ETDEWEB)

    Carajilescov, Pedro; Moreira, Joao M.L., E-mail: pedro.carajilescov@ufabc.edu.b, E-mail: joao.moreira@ufabc.edu.b [Universidade Federal do ABC (UFABC), Santo Andre, SP (Brazil). Center of Engineering, Modeling and Applied Social Sciences

    2011-07-01

    The cost of electricity generated by nuclear power is greatly affected by the capital cost, which is dependent on the construction time of the plant. This work analyses the construction time of PWRs in several countries with different market structure and licensing experience. Countries which succeeded to establish a more collaborative environment among utilities, constructors, regulators, and energy planners through effective partnerships were able to build PWRs in shorter times. The construction time in Germany, France and Russia was around 80 months and in Japan, about 60 months. The envelope of 95% of the cases includes a range between 50 and 250 months of construction time. The evaluations show that construction time of PWRs has been longer for countries that did not hold the technology to build their own reactors, and depended on contracts with foreign suppliers. The nominal power of the reactors was considered a measure of plant size, technology complexity and standardization. Countries with standardized reactor designs (France, Japan and Russia) were able to build plants in shorter times. (author)

  15. EOC construction update

    Science.gov (United States)

    2007-01-01

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  16. APPLIED ORGANIZATION OF CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Kievskiy Leonid Vladimirovich

    2017-03-01

    Full Text Available Applied disciplines in the sphere of construction which are engaged in the solution of vital macroeconomical problems (the general trend of development of these disciplines is the expansion of problematics and mutual integration are considered. Construction organization characteristic at the present stage as a systems engineering discipline covering the investment process of creation of real estate items, is given. The main source of current research trends for applied sciences (socio-economic development forecasts, regional and local programs is determined. Interpenetration and integration of various fields of knowledge exemplified by the current interindustry problem of blocks renovation organization of existing development, is demonstrated. Mathematical model of wave construction (for the period of deployment is proposed. Nature of dependence of the total duration of renovation on the limit of annual input and coefficient of renovation, is established. Overall structure of the Moscow region housing market is presented, and approaches to definition of effective demand are proposed.

  17. Patient satisfaction constructs.

    Science.gov (United States)

    Rahman, Muhammad Sabbir; Osmangani, Aahad M

    2015-01-01

    The purpose of this paper is to examine the five-factor structure of patients' satisfaction constructs toward private healthcare service providers. This research is a cross-sectional study. A questionnaire-based survey was conducted with previous and current Bangladeshi patients. Exploratory factor analysis was employed to extract the underlying constructs. Five underlying dimensions that play a significant role in structuring the satisfaction perceived by Bangladeshi private healthcare patients are identified in this study. Practical implications - The main contribution of this study is identifying the dimensions of satisfaction perceived by Bangladeshi patients regarding private healthcare service providers. Healthcare managers adopt the five identified underlying construct items in their business practices to improve their respective healthcare efficiency while ensuring overall customer satisfaction.

  18. Reliability and construction control

    Directory of Open Access Journals (Sweden)

    Sherif S. AbdelSalam

    2016-06-01

    Full Text Available The goal of this study was to determine the most reliable and efficient combination of design and construction methods required for vibro piles. For a wide range of static and dynamic formulas, the reliability-based resistance factors were calculated using EGYPT database, which houses load test results for 318 piles. The analysis was extended to introduce a construction control factor that determines the variation between the pile nominal capacities calculated using static versus dynamic formulae. From the major outcomes, the lowest coefficient of variation is associated with Davisson’s criterion, and the resistance factors calculated for the AASHTO method are relatively high compared with other methods. Additionally, the CPT-Nottingham and Schmertmann method provided the most economic design. Recommendations related to a pile construction control factor were also presented, and it was found that utilizing the factor can significantly reduce variations between calculated and actual capacities.

  19. Fire resistance in American heavy timber construction history and preservation

    CERN Document Server

    Heitz, Jesse

    2016-01-01

    This volume presents a history of heavy timber construction (HTC) in the United States, chronicling nearly two centuries of building history, from inception to a detailed evaluation of one of the best surviving examples of the type, with an emphasis on fire resistance. The book does not limit itself in scope to serving only as a common history. Rather, it provides critical analysis of HTC in terms of construction methods, design, technical specifications, and historical performance under fire conditions. As such, this book provides readers with a truly comprehensive understanding and exploration of heavy timber construction in the United States and its performance under fire conditions.

  20. Constructing criticality by classification

    DEFF Research Database (Denmark)

    Machacek, Erika

    2017-01-01

    " in the bureaucratic practice of classification: Experts construct material criticality in assessments as they allot information on the materials to the parameters of the assessment framework. In so doing, they ascribe a new set of connotations to the materials, namely supply risk, and their importance to clean energy......This paper explores the role of expertise, the nature of criticality, and their relationship to securitisation as mineral raw materials are classified. It works with the construction of risk along the liberal logic of security to explore how "key materials" are turned into "critical materials...

  1. Constructing the Audience

    DEFF Research Database (Denmark)

    Willig, Ida

    2010-01-01

    No more than twenty years ago, the doors between the newsrooms and the marketing departments of Danish newspapers were tightly shut. Today, all major Danish newspapers work with reader profiles using marketing data to create journalistic concepts. This article identifies two dominant reader...... constructions in policy papers of Danish newspapers: the reader-as-citizen, which can be traced back to the late 1940s, and the reader-as-consumer, visible in the historically new reader profiles, where we also find a third reader construction, the reader-as-commodity. The development indicates a transformation...

  2. Constructing Regional advantage

    DEFF Research Database (Denmark)

    Asheim, Bjørn T.; Boschma, Ron; Cooke, Phil

    2011-01-01

    This paper presents a regional innovation policy model based on the idea of constructing regional advantage. This policy model brings together concepts like related variety, knowledge bases and policy platforms. Related variety attaches importance to knowledge spillovers across complementary sect...... economic development within and between regions in action lines appropriate to incorporate the basic principles behind related variety and differentiated knowledge bases.......This paper presents a regional innovation policy model based on the idea of constructing regional advantage. This policy model brings together concepts like related variety, knowledge bases and policy platforms. Related variety attaches importance to knowledge spillovers across complementary...

  3. Heap-construction programs

    DEFF Research Database (Denmark)

    Edelkamp, Stefan; Elmasry, Amr; Katajainen, Jyrki

    This report together with an accompanying tar ball contains the source code of the programs described and benchmarked in the paper "Heap Construction—50 Years Later". The programs in this package describe the state of the art in heap construction in 2016.......This report together with an accompanying tar ball contains the source code of the programs described and benchmarked in the paper "Heap Construction—50 Years Later". The programs in this package describe the state of the art in heap construction in 2016....

  4. PWR plant construction in Japan

    International Nuclear Information System (INIS)

    Tamura, Toshifumi

    2002-01-01

    The construction methods based on the experiences on the Nuclear Island, which is a critical path in the total construction schedule, have been studied and reconsidered in order to construct by more reliable and economical method. So various improved construction method are being applied and the duration of construction is being reduced continuously. So various improved construction method are being applied and the duration of construction is being reduced continuously. In this paper, the history of construction of twenty-three (23) PWR Plant, the actual construction methods and schedule of Ohi-3/4, to which the many improved methods were applied during their construction, are introduced mainly with the improved points for previously constructed plants. And also the situation of construction method for the next PWR Plant is simply explained

  5. Concreting organization during Chernobylsk NPP construction

    International Nuclear Information System (INIS)

    Lysyuk, R.I.; Kareva, A.P.

    1984-01-01

    Conreting organization during the Chernobylsk NPP construction is described. Processes of extra heavy concrete production and placement, which specific mass constitutes 4t/m 3 at the age of 28 days wiath metallic aggregates and 3.3-3.5 t/m 3 at the same age without aggregates, are considered in short. Basic characteristics of this concrete are presented. At the 4th power unit labour contents for construction works were a 1.5 times lower as compared to the 3rd power unit erection. This progress was achieved by round-the-clock operation of the concrete plant with the 800 m 3 /day output and also by utilization of special equipment for mechanized concrete placement: concrete pumps, automatic concrete mixer, manipulators and concrete pipelines

  6. A brief review of the construction aggregates market

    Science.gov (United States)

    Willett, Jason Christopher

    2012-01-01

    The U.S. Geological Survey defines the construction aggregates industry as those companies that mine and process crushed stone and/or construction sand and gravel. Aggregates have been used from the earliest times of our civilization for a variety of purposes - construction being the major use. As construction aggregates, crushed stone and construction sand and gravel are the basic raw materials used to build the foundation for modern society. The widespread use of construction aggregates is the result of their general availability throughout the country and around the world along with their relatively low cost. Although construction aggregates have a low unit value, their widespread use makes them major contributors to, and indicators of, the economic well-being of the nation.

  7. Applying lean thinking in construction

    OpenAIRE

    Remon Fayek Aziz; Sherif Mohamed Hafez

    2013-01-01

    The productivity of the construction industry worldwide has been declining over the past 40 years. One approach for improving the situation is using lean construction. Lean construction results from the application of a new form of production management to construction. Essential features of lean construction include a clear set of objectives for the delivery process, aimed at maximizing performance for the customer at the project level, concurrent design, construction, and the application of...

  8. Construction of tunable peptide nucleic acid junctions.

    Science.gov (United States)

    Duan, Tanghui; He, Liu; Tokura, Yu; Liu, Xin; Wu, Yuzhou; Shi, Zhengshuang

    2018-03-15

    We report here the construction of 3-way and 4-way peptide nucleic acid (PNA) junctions as basic structural units for PNA nanostructuring. The incorporation of amino acid residues into PNA chains makes PNA nanostructures with more structural complexity and architectural flexibility possible, as exemplified by building 3-way PNA junctions with tunable nanopores. Given that PNA nanostructures have good thermal and enzymatic stabilities, they are expected to have broad potential applications in biosensing, drug delivery and bioengineering.

  9. Federal Environmental Requirements for Construction

    Data.gov (United States)

    Department of Veterans Affairs — This guide provides information on federal environmental requirements for construction projects. It is written primarily for owners of construction projects and for...

  10. Managing engineering to meet construction requirements

    International Nuclear Information System (INIS)

    Martin, D.F.; Houchen, J.D.

    1976-01-01

    The San Onofre Units 2 and 3 Project schedule is compared with Bechtel's Generic Nuclear Power Plant schedule. This comparison shows that the major delays experienced on the San Onofre Project have resulted from the regulatory process. To date, Engineering has met Construction's requirements and the Project has not experienced any Engineering related delays. The San Onofre Project has been faced with many uncertainties, such as limited site area, high seismic design criteria, new and changing Federal and State regulations, shifts in supplier market conditions and unpredictable supplier performance. Each of these uncertainties has impacted the Engineering effort and jeopardized project schedule goals. The SCE-Bechtel Engineering Management team has acted to mitigate the impact of these uncertainties through use of a cost trend program, simplification of SCE-Bechtel interfaces, close Engineering-Construction coordination, the use of task forces to handle critical supplier problems and the use of additional Engineering personnel, etc. so that Construction requirements have been met

  11. Tips for cleanroom construction and renovation.

    Science.gov (United States)

    Mixon, William; Huffman, Lanny

    2009-01-01

    The installation or renovation of a cleanroom is an increasing priority among compounders who, to offer sterile preparations, must comply with the most recent version of United States Pharmacopeia revised General Chapter 797 guidelines. To upgrade their pharmacy facilites, many compounders have worked successfully with a large-scale mechanical engineering firm or a specialized construction company dedicated to cleanroom installation. However, a qualified local mechanical contractor with design capability is a valuable and often overlooked resource for the construction of customized stae-of-the-art cleanrooms. In this report, we describe the installation of such a facility in a busy pharmacy and suggest ways in which compounding pharmacists can identify competent local contractors and control the cost of construction and upgrades. The addition of a cleanroom has enabled The Compounding Pharmacy in Hickory, North Carolina, to achieve accreditation from the Pharmacy Compounding Accreditation Board.

  12. Design and construction of mound breakwaters

    Directory of Open Access Journals (Sweden)

    Josep R. Medina

    2014-08-01

    Full Text Available This paper describes the evolution of design techniques applied to mound breakwaters as well as some key tools, equipment and construction techniques. The influence of the theoretical and laboratory research is analyzed in detail, from the pioneering research by Iribarren eighty years ago to the construction of single-layer armored breakwaters in recent decades. The economic optimization and the new embodied energy and carbon concepts associated to the construction of mound breakwaters are studied. New concepts as well as the invention of new armor units are examined as is their impact based on the observations from small-scale physical experiments and the relevance of the equipment and logistic constraints to explain the evolution of the way mound breakwaters have been designed and built over time.

  13. Industry Studies 2002: Construction

    Science.gov (United States)

    2002-01-01

    Jacksonville, FL Rotary Club of San Juan, San Juan, PR Tren Urbano Subway Project, San Juan, PR U.S. Army South, San Juan, PR U.S. Coast Guard Housing Project...are its implications for construction?, Foresight/CRISP Workshop on Nanotechnology, Royal Society of Arts . Cheltenham, England: 2001, p.5. 56 Concrete

  14. Constructing populations in biobanking

    DEFF Research Database (Denmark)

    Tupasela, Aaro; Snell, Karoliina; Cañada, Jose a.

    2015-01-01

    This article poses the question of whether biobanking practices and standards are giving rise to the construction of populations from which various biobanking initiatives increasingly draw on for legitimacy? We argue that although recent biobanking policies encourage various forms of engagement w...

  15. Anyonic FRT construction

    Energy Technology Data Exchange (ETDEWEB)

    Majid, S. [Cambridge Univ. (United Kingdom). Dept. of Applied Mathematics and Theoretical Physics (DAMTP); Rodriguez-Plaza, M.J. [Nationaal Inst. voor Kernfysica en Hoge-Energiefysica (NIKHEF), Amsterdam (Netherlands). Sectie H

    1994-12-31

    The Faddeev-Reshetikhin-Takhtajan method to construct matrix bialgebras from non-singular solutions of the quantum Yang-Baxter equation is extended to the anyonic or Z{sub n}-graded case. The resulting anyonic quantum matrices are braided groups in which the braiding is given by a phase factor. (orig.).

  16. ACCELERATING CONSTRUCTION INDUSTRY DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Mohan M. Kumaraswamy

    2006-06-01

    Full Text Available The needs for construction industry development are initially viewed from the broader perspectives of imperatives for infrastructure development and national development. All these are clearly more critical in developing countries. A non-exhaustive set of potential drivers and common barriers to construction industry development is identified from previous research. These suggest the usefulness of consolidating a cluster of recent proposals and exercises aiming at (a construction organization development in terms of an over-arching management support system model, as well as improved information and knowledge management; and (b project team development in the context of relationally integrated teams and supply chains, joint risk management and ‘technology and knowledge exchange’ in joint ventures, as well as longer term public private partnerships. These apparently disparate research thrusts are threaded together into a pattern that may inspire, if not feed, specific research and development (R & D agendas for construction industry development in different countries according to their own priorities, constraints and stages of infrastructure and national development.

  17. AA under construction

    CERN Multimedia

    CERN PhotoLab

    1979-01-01

    The AA at an early stage of construction, in the newly built AA-Hall. Cable-trays already outline the shape of the accumulator ring. To the right are huge cable-drums for the pulse-forming-network (PFN) of the injection kicker. Seeing this picture, can one imagine that only 8 months later beams were circulating in the completed accumulator ring ?

  18. File Construction Using FAMULUS.

    Science.gov (United States)

    Pao, Miranda Lee

    1982-01-01

    Describes the use of FAMULUS, a database management system, to teach library science students at Case Western Reserve University indexing, computerized file construction, and online information retrieval. The special features of FAMULUS and their use in course instruction are outlined and evaluated. A 19-item reference list is attached. (Author/JL)

  19. Nanotechnologies for sustainable construction

    DEFF Research Database (Denmark)

    Geiker, Mette Rica; Andersen, Maj Munch

    2009-01-01

    This chapter aims to highlight key aspects and recent trends in the development and application of nanotechnology to facilitate sustainable construction, use and demolition of buildings and infrastructure structures, ‘nanoconstruction’. Nanotechnology is not a technology but a very diverse...

  20. Predictable grammatical constructions

    DEFF Research Database (Denmark)

    Lucas, Sandra

    2015-01-01

    INF] as a grammatical construction consists in: 1) [méllo INF] is more resistant to restructuring than many other verbal periphrases with an INF; and 2) in LBG [méllo INF] seems to have grammaticalized — as one of its uses — a specialized function embedded in subjunctives, in which méllo...

  1. Construction Management: Planning Ahead.

    Science.gov (United States)

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  2. Constructions of Peripherality

    DEFF Research Database (Denmark)

    Carter, Helen Frances Lindsay

    2013-01-01

    In this paper I focus on the concept of peripheralisation. In particular, I consider how peripheries can be discursively constructed in the debates surrounding planning cases, and how this might serve to legitimate particular interests. This is related to the case of a proposed golf resort...

  3. KARATE WITH CONSTRUCTIVE LEARNING

    Directory of Open Access Journals (Sweden)

    Srikrishna Karanam

    2012-02-01

    Full Text Available Any conventional learning process involves the traditional hierarchy of garnering of information and then recall gathered information. Constructive learning is an important research area having wide impact on teaching methods in education, learning theories, and plays a major role in many education reform movements. It is observed that constructive learning advocates the interconnection between emotions and learning. Human teachers identify the emotions of students with varying degrees of accuracy and can improve the learning rate of the students by motivating them. In learning with computers, computers also should be given the capability to recognize emotions so as to optimize the learning process. Image Processing is a very popular tool used in the process of establishing the theory of Constructive Learning. In this paper we use the Optical Flow computation in image sequences to analyze the accuracy of the moves of a karate player. We have used the Lucas-Kanade method for computing the optical flow in image sequences. A database consisting of optical flow images by a group of persons learning karate is formed and the learning rates are analyzed in order to main constructive learning. The contours of flow images are compared with the standard images and the error graphs are plotted. Analysis of the emotion of the amateur karate player is made by observing the error plots.

  4. The Construction of Syllabi.

    Science.gov (United States)

    Labour Education, 1983

    1983-01-01

    The International Labour Organization assigned a staff member to an Asian country to assist the trade unions in strengthening their workers' education programs. One important aspect of his assignment consisted of establishing and testing a viable course program by constructing a set of syllabi for basic, specialized, and advanced courses that…

  5. Constructive Preference Elicitation

    Directory of Open Access Journals (Sweden)

    Paolo Dragone

    2018-01-01

    Full Text Available When faced with large or complex decision problems, human decision makers (DM can make costly mistakes, due to inherent limitations of their memory, attention, and knowledge. Preference elicitation tools assist the decision maker in overcoming these limitations. They do so by interactively learning the DM’s preferences through appropriately chosen queries and suggesting high-quality outcomes based on the preference estimates. Most state-of-the-art techniques, however, fail in constructive settings, where the goal is to synthesize a custom or entirely novel configuration rather than choosing the best option among a given set of candidates. Many wide-spread problems are constructive in nature: customizing composite goods such as cars and computers, bundling products, recommending touristic travel plans, designing apartments, buildings, or urban layouts, etc. In these settings, the full set of outcomes is humongous and can not be explicitly enumerated, and the solution must be synthesized via constrained optimization. In this article, we describe recent approaches especially designed for constructive problems, outlining the underlying ideas and their differences as well as their limitations. In presenting them, we especially focus on novel issues that the constructive setting brings forth, such as how to deal with sparsity of the DM’s preferences, how to properly frame the interaction, and how to achieve efficient synthesis of custom instances.

  6. Housing and construction

    Science.gov (United States)

    Delton Alderman

    2014-01-01

    OECD economies, in aggregate, have been sluggish; unemployment remains high in several countries, and minimal gross domestic product gains are forecast for the Euro area through 2016. Recession, sovereign debt problems and lethargic economies continue to constrain Europe’s housing construction market; no improvement is expected before 2015 or...

  7. Neuroeconomics: Constructing identity

    NARCIS (Netherlands)

    Davis, J.B.

    2010-01-01

    The paper asks whether neuroeconomics will make instrumental use of neuroscience to adjudicate existing disputes in economics or be more seriously transformed by neuroscience in ways that might transform economics. The paper pursues the question by asking how neuroscience constructs an understanding

  8. Provability Calculus of Constructions

    DEFF Research Database (Denmark)

    Nyblad, Kasten

    This thesis presents a type system, Provability Calculus of Constructions (PCoC) that can be used for the formalization of logic. In a theorem prover based on the system, the user can extend the prover with new inference rules in a logically consistent manner. This is done by representing PCo...

  9. Patterns of Knowledge Construction

    Science.gov (United States)

    Chang, Bo

    2018-01-01

    The purpose of this study was to identify knowledge construction patterns in a local learning community. Observation, documents, and semistructured interviews were employed to collect data. Twenty learners were interviewed. Data were analyzed inductively using the constant comparative method. Five major patterns--radiation, circulation,…

  10. Indigenous lunar construction materials

    Science.gov (United States)

    Rogers, Wayne P.; Sture, Stein

    1991-01-01

    The utilization of local resources for the construction and operation of a lunar base can significantly reduce the cost of transporting materials and supplies from Earth. The feasibility of processing lunar regolith to form construction materials and structural components is investigated. A preliminary review of potential processing methods such as sintering, hot-pressing, liquification, and cast basalt techniques, was completed. The processing method proposed is a variation on the cast basalt technique. It involves liquification of the regolith at 1200-1300 C, casting the liquid into a form, and controlled cooling. While the process temperature is higher than that for sintering or hot-pressing (1000-1100 C), this method is expected to yield a true engineering material with low variability in properties, high strength, and the potential to form large structural components. A scenario for this processing method was integrated with a design for a representative lunar base structure and potential construction techniques. The lunar shelter design is for a modular, segmented, pressurized, hemispherical dome which could serve as habitation and laboratory space. Based on this design, estimates of requirements for power, processing equipment, and construction equipment were made. This proposed combination of material processing method, structural design, and support requirements will help to establish the feasibility of lunar base construction using indigenous materials. Future work will refine the steps of the processing method. Specific areas where more information is needed are: furnace characteristics in vacuum; heat transfer during liquification; viscosity, pouring and forming behavior of molten regolith; design of high temperature forms; heat transfer during cooling; recrystallization of basalt; and refinement of estimates of elastic moduli, compressive and tensile strength, thermal expansion coefficient, thermal conductivity, and heat capacity. The preliminary

  11. [Conservation Units.

    Science.gov (United States)

    Texas Education Agency, Austin.

    Each of the six instructional units deals with one aspect of conservation: forests, water, rangeland, minerals (petroleum), and soil. The area of the elementary school curriculum with which each correlates is indicated. Lists of general and specific objectives are followed by suggested teaching procedures, including ideas for introducing the…

  12. Construction materials and Radon

    International Nuclear Information System (INIS)

    Paschuk, Sergei A.; Correa, Janine Nicolosi; Loriane, Fior; Schelin, Hugo R.; Pottker, Fabiana; Paula Melo, Vicente de

    2008-01-01

    Full text: Current studies have been performed with the aim to find the correlation of radon concentration in the air and used construction materials. At the first stage of the measurements different samples of materials used in civil construction were studied as a source of radon in the air and at the second step it was studied the radon infiltration insulation using different samples of finishing materials. For 222 Rn concentration measurements related to different construction materials as well as for the studies of radon emanation and its reduction, the sealed cell chambers, of approximately 60 x 60cm 2 , have been built using the ceramic and concrete blocks. This construction has been performed within protected and isolated laboratory environment to maintain the air humidity and temperature stable. These long term measurements have been performed using polycarbonate alpha track passive detectors. The exposure time was set about 15 days considering previous calibration performed at the Institute of Radiation Protection and Dosimetry (IRD/CNEN), where the efficiency of 70% was obtained for the density of alpha particle tracks about 13.8 cm -2 per exposure day and per kBq/m 3 of radon activity concentration. The chemical development of alpha tracks has been achieved by electrochemical etching. The track identification and counting have been done using a code based on the MATLAB Image Processing Toolbox. The cell chambers have been built following four principle steps: 1) Assembling the walls using the blocks and mortar; 2) Plaster installation; 3) Wall surface finishing using the lime; 4) Wall surface insulation by paint. Making the comparison between three layers installed at the masonry walls from concrete and ceramic blocks, it could be concluded that only wall painting with acrylic varnish attended the expectation and reduced the radon emanation flow by the factor of 2.5 approximately. Studied construction materials have been submitted the instant

  13. Foreign construction workers in Singapore.

    OpenAIRE

    Ofori G

    1997-01-01

    Provides an overview of the construction industry in Singapore. Studies the structure of the construction workforce, the terms of employment, policies towards worker, the effects of employment of foreign workers on local industry, the reducing reliance on foreign construction workers, and the future trends in Singapore's requirements for construction workers.

  14. Derailed self-constructions

    DEFF Research Database (Denmark)

    Sørensen, Niels Ulrik; Nielsen, Jens Christian

    2017-01-01

    The chapter focuses on the construction of self amongst a group of young boys in Denmark who have had experience with eating disorders, self- harm, loneli-ness and other manifestations of a lack of well- being. At first glance, these manifestations of a lack of well- being seem rather distinct...... and incomparable, but they have in common the fact that the young boys who have had these experiences say that they are due to personal faults and imperfections. In other words, they are related to problematizing thematizations of the self. In the chapter, we investigate these problematizing thematizations...... that their insider position is fragile and on the verge of collapsing, which is why they are struggling all they can to avoid being excluded and marginalized. The chapter presents a post-structuralism-inspired perspective of young boys’ construction of self, lack of well- being and how experiences of marginalization...

  15. Tools for Social Construction

    DEFF Research Database (Denmark)

    Brynskov, Martin

    divide. However, within some domains, the balance is shifting, with girls using mobile phones and social networking sites more than boys. New digital media should explore and support this shift.             New pervasive technologies offer possibilities to tie activities to the physical, informational...... for social construction, i.e. supporting staging, performing, and sharing of playful activities involving people and artifacts.             The method used is a triangulation of the problem domain—pervasive media systems for children—from three perspectives: theory, design, and empirical work......: the potential of pervasive media systems to support the children’s social construction.  ...

  16. Constructing computer virus phylogenies

    Energy Technology Data Exchange (ETDEWEB)

    Goldberg, L.A. [Warwick Univ., Coventry (United Kingdom) Dept. of Computer Science; Goldberg, P.W. [Aston Univ., Birmingham (United Kingdom) Dept. of Applied Mathematics; Phillips, C.A. [Sandia National Labs., Albuquerque, NM (United States); Sorkin, G.B. [International Business Machines Corp., Yorktown Heights, NY (United States). Thomas J. Watson Research Center

    1996-03-01

    There has been much recent algorithmic work on the problem of reconstructing the evolutionary history of biological species. Computer virus specialists are interested in finding the evolutionary history of computer viruses--a virus is often written using code fragments from one or more other viruses, which are its immediate ancestors. A phylogeny for a collection of computer viruses is a directed acyclic graph whose nodes are the viruses and whose edges map ancestors to descendants and satisfy the property that each code fragment is ``invented`` only once. To provide a simple explanation for the data, we consider the problem of constructing such a phylogeny with a minimal number of edges. In general, this optimization problem cannot be solved in quasi-polynomial time unless NQP=QP; we present positive and negative results for associated approximated problems. When tree solutions exist, they can be constructed and randomly sampled in polynomial time.

  17. Construction quality assurance report

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Construction Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project

  18. Constructing Healthcare Spaces

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    2015-01-01

    The aim of this paper is to inquire into the role of project visualisations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organisation. The theoretical contribution concerns the ways in which project visualisations plays an active role in developing novel conceptions of space and how these are mobilized in the process of on-boarding, in terms of 1. Design space (especially the engagement of users in the design...... to a number of emergent concerns in the processes of designing and constructing the new hospital, notably concerns and tensions between innovation and control....

  19. Lean Construction Implementation in the Saudi Arabian Construction Industry

    Directory of Open Access Journals (Sweden)

    Jamil Ghazi Sarhan

    2017-03-01

    Full Text Available The Kingdom of Saudi Arabia (KSA has witnessed a huge increase in construction during the last two decades. However, many projects experienced time delays, cost overruns and the generation of massive amounts of waste. To address these challenges, lean construction has been introduced into the Saudi construction industry; however, it is still in its infancy. This study therefore investigates the current state of lean construction implementation in the construction industry in the KSA. The objectives are to identify: the types of construction waste, level of use of tools that support the implementation of lean construction, stages of application of lean methods, and the benefits of lean construction. To achieve these objectives, a structured questionnaire survey of 282 construction professionals was carried out. After the analysis of the collected data using mean score and Anova test, the following conclusions were made.  In the construction industry in the KSA, waiting is the most common type of waste, while Computer Aided Design (CAD is the conventional tool supporting the implementation of lean construction. Furthermore, the data suggests that lean construction is most commonly used in the construction stage of projects while customer satisfaction is the main benefit derived from lean construction practices. This study concludes that the level of implementation of lean construction in the KSA construction industry is increasing. The results will help benchmark the current state of lean construction implementation, which will enable the construction industry to identify strategies to implement lean construction in Saudi Arabia in accordance with their needs and project goals, to achieve better productivity.

  20. LEAR construction completed

    CERN Multimedia

    CERN PhotoLab

    1982-01-01

    In July 1982, LEAR construction was completed, the individual systems had been dry-tested. On 16 July, the first 50 MeV (309 MeV/c) protons from Linac 1 were injected and circulated. On 11 October, the first antiprotons from the AA, decelerated in the PS to 609 MeV/c, were injected. Also in 1982, acceleration, deceleration and stochastic cooling were successfully tested. See 9007366 for a more detailed description. See also 8201061, 8204131, 8309026.

  1. Improving construction performance

    International Nuclear Information System (INIS)

    1990-03-01

    Design for Constructability's overall purpose was to identify and address changes in the nuclear industry to restore nuclear energy as an attractive option for new generating capacity. As the centerpiece of project control, a comprehensive, stable schedule should organize the project logically to accomplish the project's objectives. A good schedule will: integrate the project team; serve as a communications tool to all members of the project team; and provide a means to monitor and measure project performance

  2. Nanotechnologies for sustainable construction

    DEFF Research Database (Denmark)

    Geiker, Mette Rica; Andersen, Maj Munch

    2009-01-01

    This chapter aims to highlight key aspects and recent trends in the development and application of nanotechnology to facilitate sustainable construction, use and demolition of buildings and infrastructure structures, ‘nanoconstruction’. Nanotechnology is not a technology but a very diverse...... technological field which covers many aspects. The chapter therefore seeks to provide a framework for addressing relevant issues of green nanoconstruction and to bring an overview and illustrative examples of current early developments....

  3. NRC Construction Experience

    International Nuclear Information System (INIS)

    Rasmussen, Richard

    2013-01-01

    This presentation deals with the domestic and international construction experience sources. From the domestic (USA) point of view, the sources are event notifications, non-compliance reports, inspection reports, etc. Internationally, the presentation highlights the following sources: IRS and ConEx reports, Nuclear Events Web Based System (NEWS), bilateral agreements, MDEP, etc. It also mentions and describes briefly reported on concrete, rebar, fabrication and digital issues

  4. Safety Management Practices in the Bhutanese Construction Industry

    Directory of Open Access Journals (Sweden)

    Kin Dorji

    2006-12-01

    Full Text Available The construction industry is considered as one of the most hazardous industrial sectors wherein the construction workers are more prone to accidents. In developed countries such as United Kingdom and United States of America, there is strict legal enforcement of safety in the construction industry and also in the implementation of safety management systems which are designed to minimize or eliminate accidents at work places. However, occupational safety in construction industry is very poor in developing countries such as Bhutan. This study investigates the prevalent safety management practices and perceptions in the construction industry in Bhutan. The study was conducted among 40 construction contractors and 14 government officials through method of questionnaire survey, interview and discussion. The result of the study revealed that there are many occupational safety problems in the construction industry in Bhutan, problems such as lack of safety regulations and standards, low priority of safety, lack of data on safety at construction sites, lack of competent manpower, lack of safety training, lack of safety promotion and lack of documented and organized safety management systems. Furthermore, the study also proposes some recommendations for safe construction in Bhutan.

  5. Construction of Belene NPP in Bulgaria

    International Nuclear Information System (INIS)

    JSC Atomstroyexport

    2010-01-01

    Presentations concluding remarks: ASE has performed its scope of responsibilities under the Agreement of 29.11.2006 and has achieved great results regarding both the Technical part of the Project and its organization; Though there is a number of unsettled issues under the Project, in particular, the issue related to financing, ASE is willing to continue the Project and works on its development; The Russian Party believes that in case the activities under the Project are continued, Belene NPP will be constructed with high quality and within the time limits prescribed in the Agreement of 29.11.2006: 59 months before Unit 1 take-over into operation and 71 month before Unit 2 take-over into operation, starting from concreting of foundation slab of Unit 1 Reactor building

  6. Analysis of nuclear power plant construction costs

    International Nuclear Information System (INIS)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs

  7. Analysis of nuclear power plant construction costs

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

  8. INFINITY construction contract signed

    Science.gov (United States)

    2010-01-01

    Key state and community leaders celebrated April 6 with the signing of a construction contract for the state-of-the-art INFINITY Science Center planned near John C. Stennis Space Center in south Mississippi. Gulfport Mayor George Schloegel (l to r), chair of non-profit INFINITY Science Center Inc., was joined for the signing ceremony at the Hancock Bank in Gulfport by Virginia Wagner, sister of late Hancock Bank President Leo Seal Jr.; and Roy Anderson III, president and CEO of Roy Anderson Corp. Seal was the first chair of INFINITY Science Center Inc., which has led in development of the project. Roy Anderson Corp. plans to begin construction on the 72,000-square-foot, $28 million science and education center in May. The Mississippi Department of Transportation (MDOT) also is set to begin construction of a $2 million access road to the new center. The April 6 ceremony was attended by numerous officials, including former Stennis Space Center Directors Jerry Hlass and Roy Estess; Mississippi Senate President Pro Tempore Billy Hewes, R-Gulfport; Mississippi Rep. Diane Peranich, D-Pass Christian; and MDOT Southern District Commissioner Wayne Brown.

  9. Principle or constructive relativity

    Science.gov (United States)

    Frisch, Mathias

    Appealing to Albert Einstein's distinction between principle and constructive theories, Harvey Brown has argued for an interpretation of the theory of relativity as a dynamic and constructive theory. Brown's view has been challenged by Michel Janssen and in this paper I investigate their dispute. I argue that their disagreement appears larger than it actually is due to the two frameworks used by Brown and Janssen to express their respective views: Brown's appeal to Einstein's principle-constructive distinction and Janssen's framing of the disagreement as one over the question whether relativity provides a kinematic or a dynamic constraint. I appeal to a distinction between types of theories drawn by H. A. Lorentz two decades before Einstein's distinction to argue that Einstein's distinction represents a false dichotomy. I argue further that the disagreement concerning the kinematics-dynamics distinction is a disagreement about labels but not about substance. There remains a genuine disagreement over the explanatory role of spacetime geometry and here I agree with Brown arguing that Janssen sees a pressing need for an explanation of Lorentz invariance where no further explanation is needed.

  10. Filter unit

    International Nuclear Information System (INIS)

    Shiba, Kazuo; Nagao, Koji; Akiyama, Toshio; Tanaka, Fumikazu; Osumi, Akira; Hirao, Yasuhiro.

    1997-01-01

    The filter unit is used by attaching to a dustproof mask, and used in a radiation controlled area such as in a nuclear power plant. The filter unit comprises sheet-like front and back filtering members disposed vertically in parallel, a spacer for keeping the filtering members to a predetermined distance and front and back covering members for covering the two filtering members respectively. An electrostatic filter prepared by applying resin-fabrication to a base sheet comprising 100% by weight of organic fibers as fiber components, for example, wool felt, synthetic fiber non-woven fabric, wool and synthetic fiber blend non-woven fabric and then electrifying the resin is used for the filtering members. Then, residue of ashes can be eliminated substantially or completely after burning them. (I.N.)

  11. Radioactive materials in construction projects

    International Nuclear Information System (INIS)

    Herrmann, Ralf; Ohlendorf, Frank; Kaltz, Andrea Christine

    2014-01-01

    Till 1990 residues often of the former uranium mining were partly used as building material for road construction, terrain compensation and house construction in Saxony. These recommendations for action are addressed to applicants, planners and building constructors in the engineering and construction sector. It provides information for planning, preliminary investigations, applications, construction supervision related to radiation protection measures and documentation of construction projects where radioactive materials are expected.

  12. The Construction of Reality

    NARCIS (Netherlands)

    R.B.H. Hooghiemstra (Reggy)

    2003-01-01

    textabstractA number of prior studies have revealed that CEOs' accounts of company performance are self-serving. These studies, predominantly conducted in the United States, show that CEOs are willing to take credit for favourable outcomes, but are reluctant to assume responsibility for unfavourable

  13. Technique for Reduction of Environmental Pollution from Construction Wastes

    Science.gov (United States)

    Bakaeva, N. V.; Klimenko, M. Y.

    2017-11-01

    The results of the research on the negative impact construction wastes have on the urban environment and construction ecological safety are described. The research results are based on the statistical data and indicators calculated with the use of environmental pollution assessment in the restoration system of urban buildings technical conditions. The technique for the reduction of environmental pollution from construction wastes is scientifically based on the analytic summary of scientific and practical results for ecological safety ensuring at major overhaul and current repairs (reconstruction) of the buildings and structures. It is also based on the practical application of the probability theory method, system analysis and disperse system theory. It is necessary to execute some stages implementing the developed technique to reduce environmental pollution from construction wastes. The stages include various steps starting from information collection to the system formation with optimum performance characteristics which are more resource saving and energy efficient for the accumulation of construction wastes from urban construction units. The following tasks are solved under certain studies: basic data collection about construction wastes accumulation; definition and comparison of technological combinations at each system functional stage intended for the reduction of construction wastes discharge into the environment; assessment criteria calculation of resource saving and energy efficiency; optimum working parameters of each implementation stage are created. The urban construction technique implementation shows that the resource saving criteria are from 55.22% to 88.84%; potential of construction wastes recycling is 450 million tons of construction damaged elements (parts).

  14. Applying lean thinking in construction

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-12-01

    Full Text Available The productivity of the construction industry worldwide has been declining over the past 40 years. One approach for improving the situation is using lean construction. Lean construction results from the application of a new form of production management to construction. Essential features of lean construction include a clear set of objectives for the delivery process, aimed at maximizing performance for the customer at the project level, concurrent design, construction, and the application of project control throughout the life cycle of the project from design to delivery. An increasing number of construction academics and professionals have been storming the ramparts of conventional construction management in an effort to deliver better value to owners while making real profits. As a result, lean-based tools have emerged and have been successfully applied to simple and complex construction projects. In general, lean construction projects are easier to manage, safer, completed sooner, and cost less and are of better quality. Significant research remains to complete the translation to construction of lean thinking in Egypt. This research will discuss principles, methods, and implementation phases of lean construction showing the waste in construction and how it could be minimized. The Last Planner System technique, which is an important application of the lean construction concepts and methodologies and is more prevalent, proved that it could enhance the construction management practices in various aspects. Also, it is intended to develop methodology for process evaluation and define areas for improvement based on lean approach principles.

  15. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  16. 76 FR 42683 - Establishment of a Team Under the National Construction Safety Team Act

    Science.gov (United States)

    2011-07-19

    ... National Institute of Standards and Technology Establishment of a Team Under the National Construction Safety Team Act AGENCY: National Institute of Standards and Technology, United States Department of...), United States Department of Commerce, announces the establishment of a National Construction Safety Team...

  17. Estimation of wind erosion from construction of a railway in arid northwest China

    Science.gov (United States)

    A state-of-the-art wind erosion simulation model, the Wind Erosion Prediction System and the United States Environmental Protection Agency’s AP-42 emission factors formula, were combined together to evaluate wind-blown dust emissions from various construction units from a railway construction projec...

  18. Application of ABWR construction database to nuclear power plant project

    International Nuclear Information System (INIS)

    Takashima, Atsushi; Katsube, Yasuhiko

    1999-01-01

    Tokyo Electric Power Company (TEPCO) completed the construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and No. 7 (K-6/7) as the first advanced boiling water reactors (ABWR) in the world successfully. K-6 and K-7 started their commercial operations in November, 1996 and in July, 1997 respectively. We consider ABWR as a standard BWR in the world as well as in Japan because ABWR is highly reputed. However, because the interval of our nuclear power plant construction is going to be longer, our engineering level on plant construction will be declining. Hence it is necessary for us to maintain our engineering level. In addition to this circumstance, we are planning to wide application of separated purchase orders for further cost reduction. Also there is an expectation for our contribution to ABWR plant constructions overseas. As facing these circumstances, we have developed a construction database based on our experience for ABWR construction. As the first step of developing the database for these use, we analyzed our own activities in the previous ABWR construction. Through this analysis, we could define activity units of which the project consists. As the second step, we clarified the data which are treated in each activity unit and the interface among them. By taking these steps, we could develop our database efficiently. (author)

  19. TRIP RATES FOR CONDOMINIUM CONSTRUCTION PROJECT

    Directory of Open Access Journals (Sweden)

    Wirach Hirun

    2015-01-01

    Full Text Available The number of large scale condominium construction projects had dramatically increased in Bangkok. Many projects had occurred in either densely populated areas or in central business districts, where traffic conditions were usually highly congested. To prevent traffic problems, a traffic impact study must be prepared and submitted for review by concerned public authorities. Unit trip generation rates were important data in traffic impact analysis. Without accurate unit trip generation rates, public agencies could not obtain accurate information on the traffic that will be generated. This study aimed to study trip rates and the factors affecting them for condominium construction project in Bangkok. The data were collected from 30 condominium construction sites located in 15 districts of Bangkok. The analysis used the linear regression method and was divided into three cases: 1 trip rates for all vehicles, 2 trip rates for classified vehicles, and 3 trip rates for all types of condominium. All case analyses considered weekdays, Saturday, and Sunday. The results found that trip rates related to the number of dwellings in the condominium. The trip rates for all vehicle types on weekdays, Saturday, and Sunday were 10.636, 4.647, and 9.294 vehicles per 100 dwelling units per day respectively. The trip rates for six-wheeled and ten-wheeled trucks on weekdays, Saturday, and Sunday were 2.046, 0.975, and 0.575 vehicles per 100 dwelling units per day respectively. The trip rate for four-wheeled trucks and passenger cars on weekdays was 1.960. Regarding condominium types, the trip rate for low rise condominiums for all vehicle types on weekdays was 5.315 while the trip rates for high rise condominiums for weekdays, Saturday, and Sunday were 3.965, 2.667, and 1.261 respectively.

  20. Hoechst plans Mexican unit

    Energy Technology Data Exchange (ETDEWEB)

    Wood, A.; Alperowicz, N.

    1996-05-22

    Hoechst is considering plans to build its first ethoxylates project in Mexico, Mark Sijthoff, head of surfactants and auxiliaries for Hoechst`s specialty chemical business unit, tells CW. The company expects to make a decision on the 30,000-m.t./year project by the end of the year. Sijthoff would not disclose the site or where ethylene oxide (EO) feed would be obtained. The plan may depend on results of the privatization of Petroleos Mexicanos (Pemex), which is the only producer of EO in Mexico. Hoechst is part of a consortium bidding on the privatization. Sources say the unit will be built at Quimica Hoechst`s Coatzacoalcos site, close to Pemex`s EO plants at Cangregera and Morelos. A planned EO expansion at Morelos will probably move ahead when the sell-off is completed. Sijthoff says that Hoechst is also looking at improving its US surfactants position, although the company has no plans to expand ethoxylates, as there is {open_quotes}plenty of capacity.{close_quotes} Hoechst started up a 150-million lbs/year plant at Clear Lake, TX last year, ending a tolling agreement with Union Carbide. In addition, Rhone-Poulenc recently started a unit at Marcus Hook, PA, and Condea Vista is doubling its ethoxylation capacity at Lake Charles, LA. Meanwhile, Hoechst is still considering construction of 30,000-m.t./year ethoxylation plant in India or China. A decision is expected later this year.

  1. Meaning construction in remembering

    DEFF Research Database (Denmark)

    Wagoner, Brady

    2011-01-01

    F.C. Bartlett and L.S.Vygotsky were two seminal figures in the psychological study of remembering. Both emphasized the role of meaning and imagination in this process. Bartlett did this by showing the systematic and holistic changes that ensue when cultural material is repeatedly reproduced outside...... of the group to which it belongs. Vygotsky, on the other hand, attended to the ways in which we construct meaningful ―signs‖ as artificial memory aids to solve memory problems that go beyond our natural capacities. These two approaches are brought together to show how we utilize various cultural resources...

  2. Nuclear reactor constructions

    International Nuclear Information System (INIS)

    Aspden, G.J.

    1980-01-01

    A nuclear reactor construction comprising a reactor core submerged in a pool of liquid metal coolant in a primary vessel which is suspended from the roof structure of a containment vault. Control rods supported from the roof structure are insertable in the core which is carried on a support structure from the wall of the primary vessel. To prevent excessive relaxation of the support structure whereby the control rods would be displaced relative to the core, the support structure incorporates a normally inactive secondary structure designed to become effective in bracing the primary structure against further relaxation beyond a predetermined limit. (author)

  3. Constructive approach to supergravity

    International Nuclear Information System (INIS)

    Milton, K.A.; Urrutia, L.F.; Finkelstein, R.J.

    1980-01-01

    Starting from a first-order formulation of the Lagrangian of noninteracting massless helicity-2 and helicity-3/2 particles, global supersymmetry transformations are deduced. Then, allowing the supersymmetry transformations to become local requires, if supersymmetry is to be maintained, the introduction of a unique primitive interaction through the 'gravitino' stress tensor and torsion. Finally, the imposition of exact supersymmetry invariance leads by a short, constructive process to full supergravity and the complete form of the super-symmetry transformations. In particular, no explicit use is made of general coordinate invariance, and the self-consistency of the gravitational coupling emerges from the local supersymmetry requirement alone. (author)

  4. Culture in constructive remembering

    DEFF Research Database (Denmark)

    Wagoner, Brady

    2012-01-01

    , critiqued and developed with the help of a number of other thinkers. The ultimate aim of the chapter is to go beyond Bartlett and arrive at a thoroughgoing culturally inclusive psychological theory of remembering. Though Bartlett clearly situated remembering within a social process, he did not provide...... an alternative temporal metaphor of remembering as ‘construction’. If we push his metaphor further—with the help of cultural psychology—we can say memory construction is done by agents using cultural ‘tools’ such as language and narrative. In this chapter, Bartlett’s theory is contextualized, elucidated...

  5. Construction Workforce 2000.

    Science.gov (United States)

    1991-01-01

    these workers (21:78). 2.5 Aging of Population and Workforce The aging of the baby boom generation (those born between 1946 and 1961) will cause the...million nonworking women caring for their families at home. More than 75 percent of working women are in prime childbearing years. Most of them either...in a friend or relative (33:113). Many tradespeople get their first exposure to I construction work in their early teens as part-time helpers, serving

  6. [Materials for construction sector].

    Science.gov (United States)

    Macchia, C

    2012-01-01

    The construction sector is characterized by high complexity due to several factors. There are a lot of processes within the building sites and they need the use of different materials with the help of appropriate technologies. Traditional materials have evolved and diversified, meanwhile new products and materials appeared and still appear, offering services which meet user needs, but that often involve risks to the health of workers. Research in the field of materials, promoted and carried out at various levels, has led to interesting results, encoded in the form of rules and laws.

  7. Assessing the sustainable construction of large construction companies in Malaysia

    Science.gov (United States)

    Adewale, Bamgbade Jibril; Mohammed, Kamaruddeen Ahmed; Nasrun, Mohd Nawi Mohd

    2016-08-01

    Considering the increasing concerns for the consideration of sustainability issues in construction project delivery within the construction industry, this paper assesses the extent of sustainable construction among Malaysian large contractors, in order to ascertain the level of the industry's impacts on both the environment and the society. Sustainable construction explains the construction industry's responsibility to efficiently utilise the finite resources while also reducing construction impacts on both humans and the environment throughout the phases of construction. This study used proportionate stratified random sampling to conduct a field study with a sample of 172 contractors out of the 708 administered questionnaires. Data were collected from large contractors in the eleven states of peninsular Malaysia. Using the five-level rating scale (which include: 1= Very Low; 2= Low; 3= Moderate; 4= High; 5= Very High) to describe the level of sustainable construction of Malaysian contractors based on previous studies, statistical analysis reveals that environmental, social and economic sustainability of Malaysian large contractors are high.

  8. 75 FR 59933 - Specifications and Drawings for Construction of Direct Buried Plant

    Science.gov (United States)

    2010-09-29

    ... include new construction units for Fiber-to-the-Home, remove redundant or outdated requirements, and... in Fiber-to-the-Home construction as well as installation methods and materials. In order for... for Construction of Direct Buried Plant AGENCY: Rural Utilities Service, USDA. ACTION: Final rule...

  9. 77 FR 1870 - Safety Zone; Matlacha Bridge Construction, Matlacha Pass, Matlacha, FL

    Science.gov (United States)

    2012-01-12

    ...-AA00 Safety Zone; Matlacha Bridge Construction, Matlacha Pass, Matlacha, FL AGENCY: Coast Guard, DHS... be enforced during construction of the Matlacha Bridge from Thursday, December 15, 2011 until Sunday... United States during the Matlacha Bridge construction. Persons and vessels are prohibited from entering...

  10. 77 FR 20719 - Safety Zone; Matlacha Bridge Construction, Matlacha Pass, Matlacha, FL

    Science.gov (United States)

    2012-04-06

    ...-AA00 Safety Zone; Matlacha Bridge Construction, Matlacha Pass, Matlacha, FL AGENCY: Coast Guard, DHS... be enforced during construction of the Matlacha Bridge from Monday, March 12, 2012 through Tuesday... United States during the Matlacha Bridge construction. Persons and vessels are prohibited from entering...

  11. Optimization of design and erection methods to minimize the construction time-schedule of EPR plants

    International Nuclear Information System (INIS)

    Pierrat, Michel; L'Huby, Yvan; Decelle, Alain

    1999-01-01

    This paper presents the results of the investigations made during the Basic Design of the EPR project (European Pressurized water Reactor) to shorten the construction schedule. A 57 months construction schedule can be reached for the first unit. The investigations concern both design and construction methods. (author)

  12. Construction of Monju

    International Nuclear Information System (INIS)

    Yoshino, Kenichi; Ogiso, Zenichi; Nakamura, Kazuo; Nishida, Masaaki; Tateishi, Yoshinori; Mishima, Tsuyoshi

    1994-01-01

    The construction works was started in January, 1983. The main works can be divided into (1) the construction of the roads to the site including the repair of the prefectural road, (2) the preparation of the land for temporary installation outside the site, (3) the creation of the site, the excavation for building foundations, the change of the stream in the site, and the land side works of water intake and discharge facilities, (4) the sea area works of bank revetment, breakwaters and unloading quay, and (5) the manufacture of caissons and blocks in the Technoport Fukui about 60 km distant from the site. The main buildings are those for the reactor, reactor auxiliaries, maintenance and waste treatment, diesel engines, and the turbine. The aseismatic structure, the coolant temperature if it leaks were the main considerations. The manufacture, transport and installation of machinery and equipment are reported. The sodium of about 1700 t was imported from France. The MOX fuel for initial charge was produced, and the pellets were filled smoothly. (K.I.)

  13. Probabilistic liver atlas construction.

    Science.gov (United States)

    Dura, Esther; Domingo, Juan; Ayala, Guillermo; Marti-Bonmati, Luis; Goceri, E

    2017-01-13

    Anatomical atlases are 3D volumes or shapes representing an organ or structure of the human body. They contain either the prototypical shape of the object of interest together with other shapes representing its statistical variations (statistical atlas) or a probability map of belonging to the object (probabilistic atlas). Probabilistic atlases are mostly built with simple estimations only involving the data at each spatial location. A new method for probabilistic atlas construction that uses a generalized linear model is proposed. This method aims to improve the estimation of the probability to be covered by the liver. Furthermore, all methods to build an atlas involve previous coregistration of the sample of shapes available. The influence of the geometrical transformation adopted for registration in the quality of the final atlas has not been sufficiently investigated. The ability of an atlas to adapt to a new case is one of the most important quality criteria that should be taken into account. The presented experiments show that some methods for atlas construction are severely affected by the previous coregistration step. We show the good performance of the new approach. Furthermore, results suggest that extremely flexible registration methods are not always beneficial, since they can reduce the variability of the atlas and hence its ability to give sensible values of probability when used as an aid in segmentation of new cases.

  14. Construction waste generation in Malaysia construction industry: illegal dumping activities

    Science.gov (United States)

    Rahim, M. H. I. A.; Kasim, N.; Mohamed, I.; Zainal, R.; Sarpin, N.; Saikah, M.

    2017-11-01

    Nowadays development of construction in Malaysia has been effect to the increasing of construction waste. Additionally, the production of construction waste from construction projects has given negative impact to the environment especially in illegal dumping activities. The increasing number of illegal dumping activities from construction projects in Malaysia gives a sign that Malaysian construction waste management needs to be concerned. To date, a comprehensive criterion for construction waste management, particularly for a construction project in developing countries is still not clearly defined. Therefore, construction waste management in Malaysia needs further research. The objectives of this paper are to explore illegal dumping activities, and discuss the contributory factors of illegal dumping activities. Hence, this research conducted an interview with expertise in the area of construction waste management in order to scrutinise illegal dumping activities in Malaysia. The data from semistructured interviews were analysed by content analysis. Findings from this research will help to find out the strategies to reduce the illegal dumping activities. The final result also expected to increase the awareness and better solution for reducing illegal dumping activities in construction projects among construction players.

  15. United States

    Directory of Open Access Journals (Sweden)

    Stephen Bernow

    1998-12-01

    Full Text Available This paper presents and discusses an integrated set of policies designed to reduce U.S. carbon emissions over the next four decades. This innovation path also aims to promote environmental quality, particularly by reducing emissions of criteria air pollutants, to reduce U.S. dependence on imported oil, and to induce technological innovation and diffusion in energy production and consumption. The innovation path would reduce economy-wide carbon emissions by 26% below baseline projections for 2010 and by 62% below baseline projections for 2030; this translates into 10% below 1990 levels in 2010 and 45% below 1990 levels in 2030. Emissions of criteria pollutants also would be significantly reduced, as would petroleum imports by the United States. Moreover, the innovation path would yield cumulative net savings for the United States of $218 billion (1993 dollars through 2010, or $19 billion on a leveled annual basis, and would result in 800,000 additional jobs nationwide by 2010. Although the overall findings from the innovation path analysis are robust, the results should be taken as indicative, rather than precisely predictive, owing to uncertainties in future costs, prices, technology performance, and consumer behavior.

  16. Administrative Freezing of Capital Construction

    Directory of Open Access Journals (Sweden)

    Kropacheva A. V.

    2015-07-01

    Full Text Available The author estimates administrative freezing of capital construction as a type of punishment for violating laws in this sphere. The article provides the mechanism of freezing of capital construction as a serious alternative for fine sanctions

  17. Quality Building Projects Through Constructability

    National Research Council Canada - National Science Library

    Miller, Michael

    1998-01-01

    .... Constructability increases the potential for project success by expanding the role of construction expertise into front-end planning and design to anticipate and minimize problems during field operations...

  18. School Construction Summary, Fiscal 1967.

    Science.gov (United States)

    Michigan State Dept. of Education, Lansing.

    A tabular summary of school construction--public and non public--in Michigan for fiscal year 1967 is presented. Discussions of small projects approvals, transportable buildings, future construction, and special facilities are included. (FPO)

  19. PDG Construction, LLC Information Sheet

    Science.gov (United States)

    PDG Construction, LLC d/b/a Princeton Design Guild (the Company) is located in Bell Meade, New Jersey. The settlement involves renovation activities conducted at property constructed prior to 1978, located in Hopewell, New Jersey.

  20. Construction inspection manual of procedures

    Science.gov (United States)

    2009-01-01

    This manual provides highway construction personnel with relevant, practical information in order to perform accurate inspections and provide relevant construction procedural information for the various roadway and structures items of work. It is the...

  1. Structural Impact of Construction Loads

    Science.gov (United States)

    2012-08-01

    Numerous bridge construction accidents have occurred across the country because of construction loadings, which are an underemphasized : topic in many DOT specifications and design manuals. Bridge girders are least stable when they are subjected to c...

  2. United States Life Tables, 1997.

    Science.gov (United States)

    Anderson, Robert N.

    1999-01-01

    The life tables in this report are current life tables for the United States based on age-specific death rates in 1997. Beginning with the 1997 tables, U.S. life tables have been constructed with a new methodology that is similar to that used in the decennial life tables. Life expectancy and other tables are shown for the first time for ages 85 to…

  3. Quantitative Identification of Construction Risk

    OpenAIRE

    Kasprowicz T.

    2017-01-01

    Risks pertaining to construction work relate to situations in which various events may randomly change the duration and cost of the project or worsen its quality. Because of possible significant changes of random events, favorable, moderate, and difficult conditions of construction work are considered. It is the first stage of the construction risk analysis. The probabilistic parameters of construction are identified and described by using the design characteristics model of the structure and...

  4. Structural Impact of Construction Loads

    OpenAIRE

    McPheron, Daniel; McCullouch, Bob; Bowman, Mark D.

    2012-01-01

    Numerous bridge construction accidents have occurred across the country because of construction loadings, which are an under-emphasized topic in many DOT specifications and design manuals. Bridge girders are least stable when they are subjected to construction loads, so it is important for design engineers and contractors to understand and design for these loads. The Indiana Department of Transportation’s current Standard Specifications does not contain many construction load provisions, so t...

  5. Use of insulating concrete forms in residential housing construction.

    OpenAIRE

    Lewis, Dan C.

    2000-01-01

    The use of Insulated Concrete Forms (ICFs) represents a viable alternative construction method to conventional wood framing in today's residential housing marketplace. The Partnership for Advancing Housing Technology, a joint Government-private venture, will further propel the advancement of ICF construction. The National Evaluation Service is currently standardizing the ICF industry building requirements for inclusion in model building codes. There are three types of ICF building units and f...

  6. Design and construction of the ZEUS barrel calorimeter

    International Nuclear Information System (INIS)

    Repond, J.

    1990-01-01

    The mechanical design and construction techniques of the barrel calorimeter for the ZEUS detector are presented. The calorimeter uses alternate layers of depleted uranium and scintillator with one radiation length sampling. The unit cell has e/h = 1 which yields an optimal energy resolution for hadronic jets. We discuss the placing of the structural components and cracks between modules. Details of the construction and assembly effort needed to realize the total calorimeter are reported. 4 figs., 1 tab

  7. The impact of project management on nuclear construction lead times

    International Nuclear Information System (INIS)

    Radlaver, M.A.; Bauman, D.S.; Chapel, S.W.

    1985-01-01

    A two-year study of lead times for nuclear power plants found that construction time is affected by six fundamental influences. One of the six is project management. An analysis of construction management teams at 26 nuclear units found that many of the most successful shared five general characteristics: nuclear power experience, skill in project control, adaptability and initiative, commitment to success, and communication and coordination skill

  8. Informal worker phenomenon in housing construction project

    Science.gov (United States)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  9. Environmentally friendly road construction

    Directory of Open Access Journals (Sweden)

    A.I. Essawy

    2013-06-01

    Full Text Available Environmental pollution is a major problem in developing countries like Egypt. Reuse of waste polymers is considered an attractive solution for environmental white pollution and reducing of the costs of road pavement and maintenance. This research aims to prepare environmentally friendly hot mix asphalt (HMA for paving using some industrial wastes as polypropylene and polyester fibers. The solid materials in the mix include normal and highly porous aggregates. 5% and 10% of waste polymers by weight of the asphalt were used to prepare special binders. The samples were tested for their physical properties, chemical properties, aging, scanning electron microscopy (SEM and thermo-gravimetric analysis (TGA. The results revealed that the prepared HMA using 5% of waste polymer had high performance as compared to the ordinary one and the waste polymer could be used in road construction.

  10. Complex performance in construction

    DEFF Research Database (Denmark)

    Bougrain, Frédéric; Forman, Marianne; Gottlieb, Stefan Christoffer

    of the industry. The main objective of this project was to understand how the development of integrated solutions in construction led to distinct configuration of actors and structures. Furthermore, the project analyses whether these changes modified project processes and contributed to the delivery of new value......To fulfil the expectations of demanding clients, new project-delivery mechanisms have been developed. Approaches focusing on performance-based building or new procurement processers such as new forms of private-public partnerships are considered as solutions improving the overall performance...... to the end users. This report summarises the results from work undertaken in the international collaborative project “Procuring and Operating Complex Products and Systems in Construction” (POCOPSC). POCOPSC was carried out in the period 2010-2014. The project was executed in collaboration between CSTB...

  11. ON CHINESE ORDINAL CONSTRUCTIONS

    Directory of Open Access Journals (Sweden)

    Hui-Chin Tsai

    2011-06-01

    Full Text Available A Chinese ordinal construction in the form [di + Num + Cl + N] is ambiguous between a definite construal and an indefinite quantity construal. The morpheme di heads a DP, and the two readings of the ordinal expression can be attributed to the lexical ambiguity of the morpheme di. On the one hand, if the event is realized once, and there is an ordered set of objects in a single space within which the context of a sentence can verify a presupposed referential existence for the denotation of ordinal phrases, di is a [+strong] determiner giving rise to a definite reading. On the other hand, if the event is carried out more than once, no such an ordered set of objects is present in a single space, and the context of a sentence cannot verify a presupposed referential existence for the denotation of ordinal phrases, di is a [-strong] determiner with an additive function and results in an indefinite quantity reading.

  12. Bond yield curve construction

    Directory of Open Access Journals (Sweden)

    Kožul Nataša

    2014-01-01

    Full Text Available In the broadest sense, yield curve indicates the market's view of the evolution of interest rates over time. However, given that cost of borrowing it closely linked to creditworthiness (ability to repay, different yield curves will apply to different currencies, market sectors, or even individual issuers. As government borrowing is indicative of interest rate levels available to other market players in a particular country, and considering that bond issuance still remains the dominant form of sovereign debt, this paper describes yield curve construction using bonds. The relationship between zero-coupon yield, par yield and yield to maturity is given and their usage in determining curve discount factors is described. Their usage in deriving forward rates and pricing related derivative instruments is also discussed.

  13. Constructing nonhuman animal emotion.

    Science.gov (United States)

    Bliss-Moreau, Eliza

    2017-10-01

    Scientists and lay-people alike have long been fascinated with the emotional lives of nonhuman animals. To date, scientific approaches to the study of 'animal' emotion have assumed that emotions are biologically evolutionarily conserved, hardwired and have discrete behavioral and physiological outputs. According to this view, emotions and their outputs are homologous across species, allowing humans to accurately perceive (or 'read') animal emotion using our own concepts of what emotions are. In this paper, I discuss the challenges to that perspective and propose using an alternative theoretical approach to understand animal emotion. Adopting this alternative approach, which represents a collection of similar theories (referred to as 'Theories of Constructed Emotion'), changes the questions that we ask about animal emotion, how we study emotion across phylogeny and advance translational science, and how we understand the evolution of emotion. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. TOTEM Construction Complete

    CERN Multimedia

    Katarina Anthony

    2011-01-01

    The winter technical stop saw the final steps of the installation of the TOTEM experiment. After 8 years of development, the inelastic telescope T1 was successfully installed inside CMS at both sides of the interaction point. This detector joins the previously installed inelastic telescope T2 and the Roman Pots (147m and 220m from the CMS interaction point) to study both elastic and inelastic proton scattering.   The Genova team who designed and built the detector in front of the '+' arm of the T1 telescope after final insertion. All the detector chambers were assembled at the Petersburg Nuclear Physics Institute, Gatchina, Russia. Major contributions to the construction of the support structure and the installation process came from CERN. “Installing the T1 detector was an important milestone for TOTEM,” says Joachim Baechler, Technical Coordinator for TOTEM. Enrico Robutti from Genova, responsible for the T1 project, added: "The T1 detector was carefully installed ...

  15. Prefabrication in building construction: a perspective of pakistan construction industry

    International Nuclear Information System (INIS)

    Memon, N.A.; Memon, F.A.; Khehro, S.H.

    2014-01-01

    Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight) method as a MCDM approach. The results depict that main advantages of prefabrication are Shorter construction time and Less construction site waste. The top hindrances in adopting prefabrication as identified in this study are: Higher initial construction cost and Inflexible for design changes. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan. (author)

  16. Constructing Data Curation Profiles

    Directory of Open Access Journals (Sweden)

    Michael Witt

    2009-12-01

    Full Text Available This paper presents a brief literature review and then introduces the methods, design, and construction of the Data Curation Profile, an instrument that can be used to provide detailed information on particular data forms that might be curated by an academic library. These data forms are presented in the context of the related sub-disciplinary research area, and they provide the flow of the research process from which these data are generated. The profiles also represent the needs for data curation from the perspective of the data producers, using their own language. As such, they support the exploration of data curation across different research domains in real and practical terms. With the sponsorship of the Institute of Museum and Library Services, investigators from Purdue University and the University of Illinois interviewed 19 faculty subjects to identify needs for discovery, access, preservation, and reuse of their research data. For each subject, a profile was constructed that includes information about his or her general research, data forms and stages, value of data, data ingest, intellectual property, organization and description of data, tools, interoperability, impact and prestige, data management, and preservation. Each profile also presents a specific dataset supplied by the subject to serve as a concrete example. The Data Curation Profiles are being published to a public wiki for questions and discussion, and a blank template will be disseminated with guidelines for others to create and share their own profiles. This study was conducted primarily from the viewpoint of librarians interacting with faculty researchers; however, it is expected that these findings will complement a wide variety of data curation research and practice outside of librarianship and the university environment.

  17. PBO Facility Construction: GPS Network Completed

    Science.gov (United States)

    Feaux, F.; Jackson, M.; Blume, F.; Coyle, B.; Walls, C.; Friesen, B.; Austin, K.; Basset, A.; Williams, T.; Jenkins, F.; Kasmer, D.; Lawrence, S.; Enders, M.

    2008-12-01

    The Plate Boundary Observatory (PBO), part of the larger NSF-funded EarthScope project, will study the three-dimensional strain field resulting from active plate boundary deformation across the Western United States. The PBO construction phase is now completed, which involved the reconnaissance, permitting, installation, documentation, and maintenance of 891 permanent GPS stations and the upgrade of 209 existing stations in five years. Some of the GPS construction highlights from the project will be presented. These highlights include the San Simeon earthquake response, Mount Saint Helens volcano emergency response, the Magnitude 6.0 Parkfield earthquake emergency response, and GPS and tiltmeter installations on Augustine, Akutan, and Unimak Island in Alaska.

  18. Multi-objective genetic optimization of linear construction projects

    Directory of Open Access Journals (Sweden)

    Fatma A. Agrama

    2012-08-01

    Full Text Available In the real world, the majority cases of optimization problems, met by engineers, are composed of several conflicting objectives. This paper presents an approach for a multi-objective optimization model for scheduling linear construction projects. Linear construction projects have many identical units wherein activities repeat from one unit to another. Highway, pipeline, and tunnels are good examples that exhibit repetitive characteristics. These projects represent a large portion of the construction industry. The present model enables construction planners to generate optimal/near-optimal construction plans that minimize project duration, total work interruptions, and total number of crews. Each of these plans identifies, from a set of feasible alternatives, optimal crew synchronization for each activity and activity interruptions at each unit. This model satisfies the following aspects: (1 it is based on the line of balance technique; (2 it considers non-serial typical activities networks with finish–start relationship and both lag or overlap time between activities is allowed; (3 it utilizes a multi-objective genetic algorithms approach; (4 it is developed as a spreadsheet template that is easy to use. Details of the model with visual charts are presented. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in optimizing the scheduling of linear construction projects.

  19. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  20. Peru Brand: a Nation under Construction?

    OpenAIRE

    Elder Cuevas-Calderón

    2016-01-01

    During the last decade Peru has experienced a euphoric rediscovery –pseudo revaluation as a country– due to its booming gastronomy, tourism and economic growth.In this context, the presentresearch uses semio-psychoanalytic and postcolonial theories to explain Peru’s social outlook regarding the concept of nation, its reunion with a non-existent identity and the construction of the idea of nation based on the marketing campaign titled the Peru Brand. Thus, Peru Brand, far from uniting all Peru...

  1. SUBSURFACE CONSTRUCTION AND DEVELOPMENT ANALYSIS

    International Nuclear Information System (INIS)

    N.E. Kramer

    1998-01-01

    The purpose of this analysis is to identify appropriate construction methods and develop a feasible approach for construction and development of the repository subsurface facilities. The objective of this analysis is to support development of the subsurface repository layout for License Application (LA) design. The scope of the analysis for construction and development of the subsurface Repository facilities covers: (1) Excavation methods, including application of knowledge gained from construction of the Exploratory Studies Facility (ESF). (2) Muck removal from excavation headings to the surface. This task will examine ways of preventing interference with other subsurface construction activities. (3) The logistics and equipment for the construction and development rail haulage systems. (4) Impact of ground support installation on excavation and other construction activities. (5) Examination of how drift mapping will be accomplished. (6) Men and materials handling. (7) Installation and removal of construction utilities and ventilation systems. (8) Equipping and finishing of the emplacement drift mains and access ramps to fulfill waste emplacement operational needs. (9) Emplacement drift and access mains and ramps commissioning prior to handover for emplacement operations. (10) Examination of ways to structure the contracts for construction of the repository. (11) Discussion of different construction schemes and how to minimize the schedule risks implicit in those schemes. (12) Surface facilities needed for subsurface construction activities

  2. CRITICAL EVENTS IN CONSTRUCTION PROCESS

    DEFF Research Database (Denmark)

    Jørgensen, Kirsten; Rasmussen, Grane Mikael Gregaard

    2009-01-01

    Function failures, defects and poor communication are major problems in the construction industry. These failures and defects are caused by a row of critical events in the construction process. The purpose of this paper is to define “critical events” in the construction process and to investigate...... the building process and includes all participants in the construction project. A general result from the analysis was that critical events that occurred when the site was not using Lean Construction evolved much longer than critical events that occurred in the period when Lean Construction was used. Another...... cause-effects of failures and defects in the construction industry by using an analytical approach (The bowtie model) which is developed in the accident research. Using this model clarifies the relationships within the chain of failures that causes critical events with undesirable consequences...

  3. Performance and competence in usage-based construction grammar

    DEFF Research Database (Denmark)

    Jensen, Kim Ebensgaard

    2014-01-01

    While formalist approaches in the Chomskian tradition to language distinguish sharply between performance and competence in their modeling of language competence, performance and competence are considered to be in a mutually influential relation in usage-based models of language. Language......-based definition of the language system, his paper explores the interplay between performance and competence in a construction grammar perspective in which grammatical constructions are considered meaningful symbolic units on par with lexemes, in relation to the [V until ADJ]-construction, based on a study...

  4. Construction-man hour estimation for nuclear power plants

    International Nuclear Information System (INIS)

    Paek, J.H.

    1987-01-01

    This study centers on a statistical analysis of the preliminary construction time, main construction time, and total construction man hours of nuclear power plants. The use of these econometric techniques allows the major man hour driving variables to be identified through multivariate analysis of time-series data on over 80 United States nuclear power plants. The analysis made in this study provides a clearer picture of the dynamic changes that have occurred in the man hours of these plants when compared to engineering estimates of man hours, and produces a tool that can be used to project nuclear power plant man hours

  5. Construction of large-thickness sand cushions for NPP foundations

    International Nuclear Information System (INIS)

    Krantsfel'd, Ya.L.; Losievskaya, I.K.; Kovalenko, R.P.; Mutalipov, A.

    1982-01-01

    A study is made on some technological peculiarities of preparation of NPP foundations and control methods of foundation density. As an example the experience of cement-sand foundation construction for two 900 MW power-units at the Koeberg South Africa NPP is briefly described. The experience of artificial foundation construction at this NPP indicates both the possibility of obtaining the required quality of cement-sand cushions and commercial construction of large volume of such cushions by acceptable rates and the necessity of unification of work quality characteristics

  6. Implementing modular construction

    International Nuclear Information System (INIS)

    2015-01-01

    Modules are a fundamental improvement in the schedule of erection of NPPs. Modules require additional engineering related to assembly sequence, transportation and erection than a stick built unit. Modules require expedited engineering and early procurement. Modules that form part of safety related systems or structures supporting systems require fabrication in a setting that is certified and equipped for safety related work ‐ in other words, this is not a job that you can just turn over to your local shipyard. Modules logistics can be complicated. Module lifts can get heavy. CB&I is working to incorporate best practices and lessons learned from China (Sanmen 1 & 2, Haiyang 1 & 2) as well as Vogtle (3 & 4) and V.C. Summer (2 & 3) module assembly and placement

  7. Termination unit

    Science.gov (United States)

    Traeholt, Chresten [Frederiksberg, DK; Willen, Dag [Klagshamn, SE; Roden, Mark [Newnan, GA; Tolbert, Jerry C [Carrollton, GA; Lindsay, David [Carrollton, GA; Fisher, Paul W [Heiskell, TN; Nielsen, Carsten Thidemann [Jaegerspris, DK

    2014-01-07

    This invention relates to a termination unit comprising an end-section of a cable. The end section of the cable defines a central longitudinal axis and comprising end-parts of N electrical phases, an end-part of a neutral conductor and a surrounding thermally insulation envelope adapted to comprising a cooling fluid. The end-parts of the N electrical phases and the end-part of the neutral conductor each comprising at least one electrical conductor and being arranged in the cable concentrically around a core former with a phase 1 located relatively innermost, and phase N relatively outermost in the cable, phase N being surrounded by the neutral conductor, electrical insulation being arrange between neighboring electrical phases and between phase N and the neutral conductor, and wherein the end-parts of the neutral conductor and the electrical phases each comprise a contacting surface electrically connected to at least one branch current lead to provide an electrical connection: The contacting surfaces each having a longitudinal extension, and being located sequentially along the longitudinal extension of the end-section of the cable. The branch current leads being individually insulated from said thermally insulation envelope by individual electrical insulators.

  8. Termination unit

    Energy Technology Data Exchange (ETDEWEB)

    Traeholt, Chresten; Willen, Dag; Roden, Mark; Tolbert, Jerry C.; Lindsay, David; Fisher, Paul W.; Nielsen, Carsten Thidemann

    2016-05-03

    Cable end section comprises end-parts of N electrical phases/neutral, and a thermally-insulation envelope comprising cooling fluid. The end-parts each comprises a conductor and are arranged with phase 1 innermost, N outermost surrounded by the neutral, electrical insulation being between phases and N and neutral. The end-parts comprise contacting surfaces located sequentially along the longitudinal extension of the end-section. A termination unit has an insulating envelope connected to a cryostat, special parts at both ends comprising an adapter piece at the cable interface and a closing end-piece terminating the envelope in the end-section. The special parts houses an inlet and/or outlet for cooling fluid. The space between an inner wall of the envelope and a central opening of the cable is filled with cooling fluid. The special part at the end connecting to the cryostat houses an inlet or outlet, splitting cooling flow into cable annular flow and termination annular flow.

  9. Systematic review: chronic obstructive pulmonary disease and construction workers.

    Science.gov (United States)

    Borup, H; Kirkeskov, L; Hanskov, D J A; Brauer, C

    2017-04-01

    Between 15 and 20% of prevalent cases of chronic obstructive pulmonary disease (COPD) have been attributed to occupational exposures to vapours, gases, dusts and fumes. Dust at construction sites is still a challenge, but no overview exists of COPD among construction workers. To assess the occurrence of COPD among construction workers. We performed a systematic search in PubMed and Embase between 1 January 1990 and 31 August 2016 in order to identify epidemiological studies with a risk estimate for either COPD morbidity/mortality or a spirometry-based definition of airway obstruction among workers in the construction industry. The authors independently assessed studies to determine their eligibility and performed a quality assessment of the included papers. Twelve studies were included. Nine studies found a statistically significant association between COPD and work in the construction industry, although only among never-smokers in one study and only for the period after 2000 in another study. One study found that the annual decline in forced expiratory volume in 1 s was significantly higher among construction workers compared with bus drivers. This review suggests that COPD occurs more often among construction workers than among workers who are not exposed to construction dust. It is not possible to draw any conclusions on specific subgroups as most studies analysed construction workers as one united group. In addition, no potential exposure-effect relationship could be identified. © The Author 2017. Published by Oxford University Press on behalf of the Society of Occupational Medicine.

  10. Construction and exploitation of new remote sensing instruments

    Science.gov (United States)

    Maekisara, Kai

    Finnish investigations into the construction of near future instruments, descriptive and programmable, are outlined. The following instruments are discussed: the Medium Resolution Imaging Spectrometer (MERIS) and the High Resolution Imaging Spectrometer (HRIS) of the Polar Platform; lidar (light and detection ranging); the Earth Resources Satellite-1 (ERS-1) and Radarsat synthetic aperture radar; and the Advanced Microwave Sounding Unit-A (AMSU-A) and the Advanced Microwave Sounding Unit-B (AMSU-B) Polar Platform microwave instruments.

  11. Construction of the advanced boiling water reactor in Japan

    International Nuclear Information System (INIS)

    Natsume, Nobuo; Noda, Hiroshi

    1996-01-01

    The Advanced Boiling Reactor (ABWR) has been developed with international cooperation between Japan and the US as the generation of plants for the 1990s and beyond. It incorporates the best BWR technologies from the world in challengeable pursuit of improved safety and reliability, reduced construction and operating cost, reduced radiation exposure and radioactive waste. Tokyo Electric Power Company (MPCO) decided to apply the first ABWRs to unit No. 6 and 7 of Kashiwazaki-Kariwa nuclear power station (K-6 and 7). These units are scheduled to commence commercial operation in December 1996 and July 1997 respectively. Particular attention is given in this discussion to the construction period from rock inspection for the reactor building to commercial operation, which is to be achieved in only 52 months through innovative and challenging construction methods. To date, construction work is advancing ahead of the original schedule. This paper describes not only how to shorten the construction period by adoption of a variety of new technologies, such as all-weather construction method and large block module construction method, but also how to check and test the state of the art technologies during manufacturing and installation of new equipment for K-6 and 7

  12. Culture in constructive remembering

    DEFF Research Database (Denmark)

    Wagoner, Brady

    2012-01-01

    The present chapter explores novel ways of thinking about what it means to remember and how precisely culture is involved in this process. Since Plato, the dominant metaphor for conceptualizing memory has been that of a spatial ‘storage’. In contrast to this, Frederic Bartlett advanced an alterna......The present chapter explores novel ways of thinking about what it means to remember and how precisely culture is involved in this process. Since Plato, the dominant metaphor for conceptualizing memory has been that of a spatial ‘storage’. In contrast to this, Frederic Bartlett advanced...... an alternative temporal metaphor of remembering as ‘construction’. If we push his metaphor further—with the help of cultural psychology—we can say memory construction is done by agents using cultural ‘tools’ such as language and narrative. In this chapter, Bartlett’s theory is contextualized, elucidated......, critiqued and developed with the help of a number of other thinkers. The ultimate aim of the chapter is to go beyond Bartlett and arrive at a thoroughgoing culturally inclusive psychological theory of remembering. Though Bartlett clearly situated remembering within a social process, he did not provide...

  13. Second unit scheduling concerns on a dual-unit nuclear project

    International Nuclear Information System (INIS)

    Block, H.R.; Mazzini, R.A.

    1978-01-01

    This paper explores the planning and scheduling problems of Unit 2 of the Susquehanna steam electric station. The causes of these problems and methods to avoid or mitigate their consequences are discussed. The Susquehanna steam electric station has two boiling water reactors rated at 1,100 MW each. Topics considered include cost factors, structures, equipment, engineering and home office, construction services, completion data phasing, work sequencing, structural dependences, and segregation. Substatial cost and schedule benefits can result if two nuclear units are designed and constructed as one integral station, and if maximum sharing of facilities and services between the units occurs. It is concluded that the cost benefits of highly integrated dual unit construction outweigh the schedule and logistical problems caused by that approach

  14. Causes of Construction Delays in Qatar Construction Projects

    OpenAIRE

    Murat Gunduz; Mohanad H. A. AbuHassan

    2016-01-01

    Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction ...

  15. Construction and operation costs of constructed wetlands treating wastewater.

    Science.gov (United States)

    Gkika, Dimitra; Gikas, Georgios D; Tsihrintzis, Vassilios A

    2014-01-01

    Design data from nine constructed wetlands (CW) facilities of various capacities (population equivalent (PE)) are used to estimate construction and operation costs, and then to derive empirical equations relating the required facility land area and the construction cost to PE. In addition, comparisons between the costs of CW facilities based on various alternative construction materials, i.e., reinforced concrete and earth structures (covered with either high density polyethylene or clay), are presented in relation to the required area. The results show that earth structures are economically advantageous. The derived equations can be used for providing a preliminary cost estimate of CW facilities for domestic wastewater treatment.

  16. Learning unit: Thin lenses

    Science.gov (United States)

    Nita, L.-S.

    2012-04-01

    Learning unit: Thin lenses "Why objects seen through lenses are sometimes upright and sometimes reversed" Nita Laura Simona National College of Arts and Crafts "Constantin Brancusi", Craiova, Romania 1. GEOMETRIC OPTICS. 13 hours Introduction (models, axioms, principles, conventions) 1. Thin lenses (Types of lenses. Defining elements. Path of light rays through lenses. Image formation. Required physical quantities. Lens formulas). 2. Lens systems (Non-collated lenses. Focalless systems). 3. Human eye (Functioning as an optical system. Sight defects and their corrections). 4. Optical instruments (Characteristics exemplified by a magnifying glass. Paths of light rays through a simplified photo camera. Path of light rays through a classical microscope) (Physics curriculum for the IXth grade/ 2011). This scenario exposes a learning unit based on experimental sequences (defining specific competencies), as a succession of lessons started by noticing a problem whose solution assumes the setup of an experiment under laboratory conditions. Progressive learning of theme objectives are realised with sequential experimental steps. The central cognitive process is the induction or the generalization (development of new knowledge based on observation of examples or counterexamples of the concept to be learnt). Pupil interest in theme objectives is triggered by problem-situations, for example: "In order to better see small objects I need a magnifying glass. But when using a magnifier, small object images are sometimes seen upright and sometimes seen reversed!" Along the way, pupils' reasoning will converge to the idea: "The image of an object through a lens depends on the relative distances among object, lens, and observer". Associated learning model: EXPERIMENT Specific competencies: derived from the experiment model, in agreement with the following learning unit steps I. Evoking - Anticipation: Size of the problem, formulation of hypotheses and planning of experiment. II

  17. MODULAR CONSTRUCTION SYSTEM EVALUATION

    International Nuclear Information System (INIS)

    Gillespie, S.

    2002-01-01

    The purpose of this study is to respond to U.S. Department of Energy (DOE) Technical Direction Letter (TDL) 02-003 (Waisley 2001), which directs Bechtel SAIC Company, LLC (BSC) to complete a design study to recommend repository design options to support receipt and/or emplacement of any or all of the following: commercial spent nuclear fuel (CSNF), high-level radioactive waste (HLW), DOE-managed spent nuclear fuel (DSNF) (including naval spent nuclear fuel [SNF]), and immobilized plutonium (if available), as soon as practicable, but no later than 2010. From the possible design options, a recommended approach will be determined for further evaluation to support the preliminary design of the repository. This study integrates the results of the repository Design Evolution Study (Rowe 2002) with supporting studies concerning national transportation options (BSC 2002b) and Nevada transportation options (Gehner 2002). The repository Design Evolution Study documents the processes used to reevaluate the design, construction, operation, and cost of the repository in response to TDL 02-003 (Waisley 2001), and to determine possible repository conceptual design options. The transportation studies evaluate the national and Nevada transportation options that support the repository conceptual design options. An evaluation methodology was established, based on Program-level requirements developed for the study in reference BSC 2001a, to allow the repository and system design options to be evaluated on a consistent basis. The transportation options and the design components were integrated into system design implementation options, which were evaluated using receipt and emplacement scenarios. The scenarios tested the ability of the design concept to adapt to changes in funding, waste receipt rate, and Nevada rail transportation availability. The results of the evaluation (in terms of system throughput, cost, and schedule) were then compared to the Program-level requirements, and

  18. Assessing problem-solving skills in construction education with the virtual construction simulator

    Science.gov (United States)

    Castronovo, Fadi

    problem-solving skills, a new version of the VCS(4) was developed, with new building modules and assessment framework. The design and development of the VCS4 leveraged research in educational psychology, multimedia learning, human-computer interaction, and Building Information Modeling. In this dissertation the researcher aimed to evaluate the pedagogical value of the VCS4 in fostering problem-solving skills. To answer the research questions, a crossover repeated measures quasi-experiment was designed to assess the educational gains that the VCS can provide to construction education. A group of 34 students, attending a fourth-year construction course at a university in the United States was chosen to participate in the experiment. The three learning modules of the VCS were used, which challenged the students to plan and manage the construction process of a wooden pavilion, the steel erection of a dormitory, and the concrete placement of the same dormitory. Based on the results the researcher was able to provide evidence supporting the hypothesis that the chosen sample of construction students were able to gain and retain problem-solving skills necessary to solve complex construction simulation problems, no matter what the sequence with which these modules were played. In conclusion, the presented results provide evidence supporting the theory that educational simulation games can help the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems.

  19. Document management in engineering construction

    International Nuclear Information System (INIS)

    Liao Bing

    2008-01-01

    Document management is one important part of systematic quality management, which is one of the key factors to ensure the construction quality. In the engineering construction, quality management and document management shall interwork all the time, to ensure the construction quality. Quality management ensures that the document is correctly generated and adopted, and thus the completeness, accuracy and systematicness of the document satisfy the filing requirements. Document management ensures that the document is correctly transferred during the construction, and various testimonies such as files and records are kept for the engineering construction and its quality management. This paper addresses the document management in the engineering construction based on the interwork of the quality management and document management. (author)

  20. Grammatical Constructions as Relational Categories.

    Science.gov (United States)

    Goldwater, Micah B

    2017-07-01

    This paper argues that grammatical constructions, specifically argument structure constructions that determine the "who did what to whom" part of sentence meaning and how this meaning is expressed syntactically, can be considered a kind of relational category. That is, grammatical constructions are represented as the abstraction of the syntactic and semantic relations of the exemplar utterances that are expressed in that construction, and it enables the generation of novel exemplars. To support this argument, I review evidence that there are parallel behavioral patterns between how children learn relational categories generally and how they learn grammatical constructions specifically. Then, I discuss computational simulations of how grammatical constructions are abstracted from exemplar sentences using a domain-general relational cognitive architecture. Last, I review evidence from adult language processing that shows parallel behavioral patterns with expert behavior from other cognitive domains. After reviewing the evidence, I consider how to integrate this account with other theories of language development. Copyright © 2017 Cognitive Science Society, Inc.

  1. Constructive Memory: Past and Future

    OpenAIRE

    Schacter, Daniel L.

    2012-01-01

    Human memory is not a literal reproduction of the past, but instead relies on constructive processes that are sometimes prone to error and distortion. Understanding of constructive memory has accelerated during recent years as a result of research that has linked together its cognitive and neural bases. This article focuses on three aspects of constructive memory that have been the target of recent research: (i) the idea that certain kinds of memory distortions reflect the operation of adapti...

  2. Risk management in construction company

    OpenAIRE

    Nučič, Jernej

    2011-01-01

    In master's thesis I discuss the field of risk management process in construction projects from the viewpoint of a building contractor. I present risk overview, previous research in this area and a new approach to risk analysis in construction by project components. The proposed methodology for risk management in a construction company, described in this thesis is based on the proposed checklist. Proposed checklist includes all identified risks in terms of building contractor and ...

  3. Welding of large-size embelled fittings in NPP construction

    International Nuclear Information System (INIS)

    Semenov, N.A.; Savinov, O.A.

    1988-01-01

    Drawbacks of the accepted technology for peoducing embedded fittings are considered. Activities on modernization of the standard ADF-2001 automatic welding machine are described. Results of testing the samples of welded joints performed using the modernized automatic welding machine, and economic effect caused by its introduction at the balakovo NPP second unit construction are presented

  4. WIPP: construction and progress on a successful nuclear waste repository

    International Nuclear Information System (INIS)

    Cooper, W.R.; Sankey, C.A.

    1985-01-01

    The Department of Energy is constructing the Waste Isolation Pilot Plant (WIPP) in Southeastern New Mexico. The facility will retrievably store transuranic waste from defense activities of the United States and conduct experiments with Defense high-level waste which will be retrieved at the end of the experiments. This paper describes the progress and the present status of activities at WIPP. 4 refs

  5. Simulation-based modeling of building complexes construction management

    Science.gov (United States)

    Shepelev, Aleksandr; Severova, Galina; Potashova, Irina

    2018-03-01

    The study reported here examines the experience in the development and implementation of business simulation games based on network planning and management of high-rise construction. Appropriate network models of different types and levels of detail have been developed; a simulation model including 51 blocks (11 stages combined in 4 units) is proposed.

  6. Construction of cost effective homebuilt spin coater for coating ...

    African Journals Online (AJOL)

    We report the construction of a cost effective and low power consumption spin coater from a direct current (DC) brushless motor. The DC mechanical component is widdely available in the central processing unit (CPU) cooler. This set up permits simple operation where the DC voltage can be controlled manually in order to ...

  7. Warm season performance of horizontal subsurface flow constructed ...

    African Journals Online (AJOL)

    Experimental units were filled with substrate of either sand or gravel and operated under hydraulic retention times of 5 and 10 days. Constructed wetlands demonstrated a very good performance in removing organic matter, fecal indicator microorganisms and nutrients from the influent representing a good alternative for the ...

  8. Design and construction of a low cost 50-watt capacity ...

    African Journals Online (AJOL)

    This paper describes the design and construction of a stand-by mode 50-Watt Uninterruptible Power Supply (UPS) as an alternative power supply for electrical and electronic appliances from local materials. The development of this UPS system (a system consisting of battery source, inverter, and switching unit) is to provide ...

  9. Effectiveness of vegetated constructed wetland in the reducation of ...

    African Journals Online (AJOL)

    This paper describes the performance of a Horizontal Sub-Surface Flow Constructed Wetland (HSSFCW) as a post-treatment unit to reduce BOD5 from Upflow Anaerobic Sludge Blanket (UASB) pre-treated domestic wastewater in a pilot treatment system at the University College of Lands and Architectural Studies (UCLAS) ...

  10. Construction of extended exponential general linear methods 524 ...

    African Journals Online (AJOL)

    This paper introduces a new approach for constructing higher order of EEGLM which have become very popular and novel due to its enviable stability properties. This paper also shows that methods 524 is stable with its characteristics root lies in a unit circle. Numerical experiments indicate that Extended Exponential ...

  11. A profile of wood use in nonresidential building construction

    Science.gov (United States)

    H. N. Spelter; R. G. Anderson

    This report presents estimates of the amounts of lumber, glued-laminated lumber, trusses, plywood, particleboard, hardboard, and wood shingles used in new nonresidential building construction in the United States. Use of wood products is shown for several building types, project sizes, and building components. The estimates are based on a survey of 489 projects under...

  12. Strategies for healthcare facilities, construction, and real estate management.

    Science.gov (United States)

    Lee, James G

    2012-05-01

    Adventist HealthCare offers the following lessons learned in improving the value of healthcare facilities, construction, and real estate management: Use an integrated approach. Ensure that the objectives of the approach align the hospital or health system's mission and values. Embrace innovation. Develop a plan that applies to the whole organization, rather than specific business units. Ensure commitment of senior leaders.

  13. Performance of Subsurface Flow Constructed Wetland for Domestic ...

    African Journals Online (AJOL)

    Constructed wetlands (CW) have recently emerged as efficient technology for secondary treatment of wastewater in developing countries because of its low cost, ease operation, maintenance and generally good performance. At present there are a number of small scale units of CW for wastewater treatment in Tanzania but ...

  14. Constructing a sophistication index as a method of market ...

    African Journals Online (AJOL)

    Several factors contribute to the appeal of this approach. ... relevance for marketing practitioners is the process of index construction as a method of market ... farming business. It should be noted that lower levels of sophistication, however, do not suggest units being regarded as unsophisticated, but merely falling on a.

  15. Recombinant DNA technologies for construction of precisely designed transgene constructs.

    Science.gov (United States)

    Ohtsuka, Masato; Kimura, Minoru; Tanaka, Masafumi; Inoko, Hidetoshi

    2009-02-01

    Genetically modified animals have been used as models in broad range of studies including pharmaceutical biology. Designing and construction of transgene constructs are the first indispensable task in generating model animals. In addition to the classical restriction enzyme-based method, still holds some advantages in generating precise constructs, site-specific recombinase-based and homologous recombination-based DNA engineering strategies (e.g. Gateway and Red/ET recombineering, respectively) have been developed and widely used for vector construction or BAC modification. In this review, the three construction methods are described and their applications are discussed such as tandem assemblies of multiple components and modification of large DNA molecules. Combinational use of these E. coli-based recombinant DNA technologies enables the generation of precisely designed vectors useful for desired genome modification for future analyses.

  16. PBO Facility Construction: GPS Network Status

    Science.gov (United States)

    Feaux, K.; Jackson, M.; Anderson, G.; Mencin, D.; Pauk, B.; Hafner, K.; Coyle, B.; Walls, C.; Friesen, B.; Borenstein, S.

    2005-12-01

    The Plate Boundary Observatory (PBO), part of the larger NSF-funded EarthScope project, will study the three-dimensional strain field resulting from active plate boundary deformation across the Western United States. PBO is a large construction project involving the reconnaissance, permitting, installation, documentation, and maintenance of 875 permanent GPS stations in five years. PBO has a demanding 5-year project installation schedule, for both GPS and strainmeter installations. During the second year of the project, the GPS Operations of PBO had accelerated production goals in reconnaissance, permitting, and installation activities. Some of the construction highlights in Year 2 include the Mount Saint Helens emergency response, the Magnitude 6.0 Parkfield earthquake emergency response, and GPS installations on the Akutan Volcano. GPS operations also prioritized permitting activity and installations in response to the Magnitude 5.2 Southern California earthquake and the Magnitude 6.7 Northern California earthquake in June, 2005. In addition to network construction, the GPS operations stepped up its maintenance activities which will continue to accelerate over the course of the project. To date, PBO has installed 270+ of the 482 GPS stations scheduled to be installed by the end of Year 3.

  17. Innovation in civil construction system of nuclear power plant

    International Nuclear Information System (INIS)

    Takami, Masahiro

    1996-01-01

    Nowadays, the computer-aided production systems have been already introduced to almost all kinds of industries. The construction industry, which has been said to be conservative for the modernization of production system, now expects the CIC (Computer Integrated Construction) as the means to innovate the construction production process. Shimizu Corporation has developed the new computer-aided production system, 'SIPS: Shimizu Integrated Production System', and has used it in the actual construction projects. In the system, the computer supports every phase of construction projects like market researching, design, material purchase, construction work, and maintenance. The project of Kashiwazaki-kariwa Nuclear Power Station Unit No.7 is one of the model cases. Here we applied following three concepts, (1) the full use and integration of 3D-CAD data-base through all phases of construction, (2) the setting-up of the information network system among the site office, the head office, and the mechanical and electrical manufacturer, (3) the introduction of advanced construction technologies such as large block prefabrication method. (author)

  18. Industrial safety management with emphasis on construction safety

    International Nuclear Information System (INIS)

    Bhattacharya, R.

    2016-01-01

    Safety professionals, line managers, team leaders and concerned workers today eagerly discuss to find out the best safety approach for their workplace. Some research suggested that behaviour based and comprehensive ergonomics approaches lead in average reduction of injuries. This article discusses 'the science and engineering' behind improvement in industrial safety aspects particularly at construction sites through various safety approaches. A high degree of commitment to safety by the project management and rigorous and proactive measures are essential to prevent accidents at construction sites particularly in DAE units because of its sensitivity. Persistent efforts by the project management are needed for sustainable and committed safety at work place. The number of fatalities occurring from construction work in DAE units is sometimes disturbing and fall of person from height and through openings are the major causes for serious accidents

  19. Historical construction costs of global nuclear power reactors

    International Nuclear Information System (INIS)

    Lovering, Jessica R.; Yip, Arthur; Nordhaus, Ted

    2016-01-01

    The existing literature on the construction costs of nuclear power reactors has focused almost exclusively on trends in construction costs in only two countries, the United States and France, and during two decades, the 1970s and 1980s. These analyses, Koomey and Hultman (2007); Grubler (2010), and Escobar-Rangel and Lévêque (2015), study only 26% of reactors built globally between 1960 and 2010, providing an incomplete picture of the economic evolution of nuclear power construction. This study curates historical reactor-specific overnight construction cost (OCC) data that broaden the scope of study substantially, covering the full cost history for 349 reactors in the US, France, Canada, West Germany, Japan, India, and South Korea, encompassing 58% of all reactors built globally. We find that trends in costs have varied significantly in magnitude and in structure by era, country, and experience. In contrast to the rapid cost escalation that characterized nuclear construction in the United States, we find evidence of much milder cost escalation in many countries, including absolute cost declines in some countries and specific eras. Our new findings suggest that there is no inherent cost escalation trend associated with nuclear technology. - Highlights: •Comprehensive analysis of nuclear power construction cost experience. •Coverage for early and recent reactors in seven countries. •International comparisons and re-evaluation of learning. •Cost trends vary by country and era; some experience cost stability or decline.

  20. A Study of Construction Reactor Oversight Process in US

    International Nuclear Information System (INIS)

    Yun, I.; Kim, S. Y.; Jeong, G. Y.; Kim, S. P.

    2015-01-01

    This process provides a risk-informed approach such as construction significance determination process (SDP) and construction program performance index analogous to those used in the Reactor Oversight Process (ROP). The cROP has been applied to Vogtle units 3, 4 and V.C. Summer units 2, 3 under construction for the regulatory inspection. In this paper, the cROP is dissected to present its major contents and characteristics. The main features of the cROP can be summarized as followings: 1) The cROP which adopts the concept of the ROP used for operating NPPs assesses NPP under construction periodically to determine the appropriate level of regulatory response. 2) The cROP consists of three parts: the CIP, the CAP and the CEP. 3) The inspections for NPPs under construction can be categorized into three parts: vendor inspection, baseline inspection and supplemental and plant specific inspections. USNRC's regulatory resources can be used effectively based on baseline inspection, which is using ITAAC inspections. The construction SDP is used to assign the color scheme to categorize the significance of inspection findings. Regulatory actions are taken from CAM to which the significance of inspection findings input. In this paper, major contents and characteristics of USNRC's cROP have been presented

  1. High voltage power network construction

    CERN Document Server

    Harker, Keith

    2018-01-01

    This book examines the key requirements, considerations, complexities and constraints relevant to the task of high voltage power network construction, from design, finance, contracts and project management to installation and commissioning, with the aim of providing an overview of the holistic end to end construction task in a single volume.

  2. New Ideas for School Construction.

    Science.gov (United States)

    Producers' Council, Inc., Washington, DC.

    Present educators, architects, engineers, and building product manufacturers with a medium of common interest for discussion of mutual school construction problems, objectives, needs, ideas, capabilities and limitations. Contents include--(1) modern wood construction, (2) school room in a steel mill, (3) masonry in new school design, (4) the…

  3. Design Processes and Constructive Ergonomics

    DEFF Research Database (Denmark)

    Broberg, Ole

    2015-01-01

    This paper discusses some central issues in the concept of constructive ergonomics. It does so by reflecting on experiences from ergonomics intervention projects carried out in Denmark. Constructive ergonomics has a huge potential as a new way to go for ergonomics research and practice. However...

  4. Constructing catalogue of temporal situations

    Directory of Open Access Journals (Sweden)

    Violetta Koseska-Toszewa

    2015-11-01

    absent and not understandable in the other. It leads to assign meanings to situations, rather than to linguistic forms used for their expression. The second principle is limit the discussed issues to such a piece of reality that can be possible for precise description. The third is to avoid introducing such information to the described reality that is not explicitly mentioned by linguistic means. The authors try to following these principles in the present paper. The paper is organized as follows. First, some samples of situations related to present tense are given together with examples of their expressions in four languages: English, (as a reference language and three Slavic languages, representing South slavonic languages (Bulgarian, West slavonic languages (Polish, and East slavonic languages (Russian. Within the same framework the next parts of the paper are constructed, supplying samples of using Past tenses and, finally, future tenses and modalities. The formal tools for description purposes are introduced stepwise, according to needs caused be the described reality. There are mainly Petri nets, equipped additionally with inscriptions or labeling in order to keep proper assignations of description units to described objects.

  5. Field Testing of Compartmentalization Methods for Multifamily Construction

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, K. [Building Science Corporation, Westford, MA (United States); Lstiburek, J. [Building Science Corporation, Westford, MA (United States)

    2015-03-01

    The 2012 IECC has an airtightness requirement of 3 air changes per hour at 50 Pascals test pressure for both single-family and multifamily construction in Climate Zones 3-8. Other programs (LEED, ASHRAE 189, ASHRAE 62.2) have similar or tighter compartmentalization requirements, driving the need for easier and more effective methods of compartmentalization in multifamily buildings. Builders and practitioners have found that fire-resistance rated wall assemblies are a major source of difficulty in air sealing/compartmentalization, particularly in townhouse construction. This problem is exacerbated when garages are “tucked in” to the units and living space is located over the garages. In this project, Building Science Corporation examined the taping of exterior sheathing details to improve air sealing results in townhouse and multifamily construction, when coupled with a better understanding of air leakage pathways. Current approaches are cumbersome, expensive, time consuming, and ineffective; these details were proposed as a more effective and efficient method. The effectiveness of these air sealing methods was tested with blower door testing, including “nulled” or “guarded” testing (adjacent units run at equal test pressure to null out inter-unit air leakage, or “pressure neutralization”). Pressure diagnostics were used to evaluate unit-to-unit connections and series leakage pathways (i.e., air leakage from exterior, into the fire-resistance rated wall assembly, and to the interior).

  6. Barriers of lean construction implementation in the Moroccan construction industry

    Science.gov (United States)

    Bajjou, Mohamed Saad; Chafi, Anas

    2018-04-01

    Improving the production system performance has become a fundamental pillar that must be taken into consideration in the construction industry. Recent developments in the construction sector have led to renewed interest in new techniques of management. Lean Construction is a very effective approach that has gained a high popularity by its ability to eliminate waste and maximize the value for the customer. Although both developed and developing countries have gained large benefits by implementing Lean Construction approach, several experiences showed many barriers that are hindering its implementation especially in developing countries. This paper aims to assess the critical barriers to the successful implementation in the Moroccan construction industry. Based on a literature review, followed by an analysis of data collected from a questionnaire survey which targeted 330 practitioners in the Moroccan construction field, several barriers were identified as key barriers. The findings of this investigation revealed that there are significant barriers such as Lack of knowledge about Lean Construction concepts, Unskilled Human Resources, and insufficient financial resources.

  7. Construction method for plant facility

    International Nuclear Information System (INIS)

    Ito, Arata; Hirono, Hideharu; Kyoda, Shigeru; Hanawa, Minoru; Sato, Hitoshi

    1998-01-01

    A caisson structure is disposed on a construction site for facilities of nuclear power plants. A digging work is performed below the caisson structure and, simultaneous with the digging work, a construction of a base, construction of plant facilities including a building and installation of plant facility are performed on the caisson structure. Then, the caisson structure is sank together with the structures on a base rock in association with the progress of the digging work and secured on the base rock. When securing them on the base rock, a groove is formed to the base rock along tuyere of the caisson structure so that the tuyere and a ceiling portion of the caisson structure are in direct contact with the base rock. Since the construction for the containing building conducted on the caisson structure is performed simultaneous with the digging work conducted below the caisson structure, the term required for the construction of the plant facilities can greatly reduced. (N.H.)

  8. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  9. Statics of historic masonry constructions

    CERN Document Server

    Como, Mario

    2016-01-01

    This successful book, which is now appearing in its second edition, presents a comprehensive new Statics of Masonry Constructions. Masonry constructions are the great majority of the buildings in Europe’s historic centres and the most important monuments in its architectural heritage. Given the age of these constructions, the demand for safety assessments and restoration projects is pressing and constant. The book you hold in hands contributes to fill this demand. The second edition integrates the original text of the first edition with new developments, widening and revisions, due to recent research studies achievements. The result is a book that gives a complete picture of the behaviour of the Masonry Constructions. First of all, it gives the fundamentals of its Statics, based on the no-tension assumption, and then it develops the Limit Analysis for the Masonry Constructions. In this framework, through an interdisciplinary approach combining Engineering and Architecture, the book also investigates the sta...

  10. Combinatorial designs constructions and analysis

    CERN Document Server

    Stinson, Douglas R

    2004-01-01

    Created to teach students many of the most important techniques used for constructing combinatorial designs, this is an ideal textbook for advanced undergraduate and graduate courses in combinatorial design theory. The text features clear explanations of basic designs, such as Steiner and Kirkman triple systems, mutual orthogonal Latin squares, finite projective and affine planes, and Steiner quadruple systems. In these settings, the student will master various construction techniques, both classic and modern, and will be well-prepared to construct a vast array of combinatorial designs. Design theory offers a progressive approach to the subject, with carefully ordered results. It begins with simple constructions that gradually increase in complexity. Each design has a construction that contains new ideas or that reinforces and builds upon similar ideas previously introduced. A new text/reference covering all apsects of modern combinatorial design theory. Graduates and professionals in computer science, applie...

  11. Innovations in Construction Personnel Education

    Directory of Open Access Journals (Sweden)

    Nicał Aleksander

    2016-01-01

    Full Text Available The Erasmus+ programme, financed by the European Union, encourages international projects focused on education and recognition of professional qualifications. Projects presented in this paper deepen the ideas of Directive 89/48/EWG, which will lead to the creation of a proper European system of comparison, certification and mutual recognition of qualifications in construction. Results of the projects will improve didactic process and qualifications recognition of European Union managers in construction. Paper presents 3 Erasmus+ projects: “The Augmented Reality Formwork Assembly Training” (Project number 2016-1-PL01-KA202-026102, “Common Learning Outcomes for Construction Managers in EU, part IV” (Project number 2015-1-PL01-KA202-016454, and “Continuing V.E.T. Training Programme in Lean Construction to support the transition of the Construction Sector towards a more competitive and productive model” (Project number 2016-1-ES01-KA202-025694.

  12. Nuclear power plant 5,000 to 10,000 kilowatts

    Energy Technology Data Exchange (ETDEWEB)

    1956-02-01

    The purpose of this proposal is to present a suggested program for the development of an Aqueous Homogeneous Reactor Power Plant for the production of power in the 5000 to 10,000 kilowatt range under the terms of the Atomic Energy Commission's invitation of September 21, 1955. It envisions a research and development program prior to finalizing fabricating commitments of full scale components for the purpose of proving mechanical and hydraulic operating and chemical processing feasibility with the expectation that such preliminary effort will assure the contruction of the reactor at the lowest cost and successful operation at the earliest date. It proposes the construction of a reactor for an eventual net electrical output of ten megawatts but initially in conjunction with a five megawatt turbo-generating unit. This unit would be constructed at the site of the existing Hersey diesel generating plant of the Wolverine Electric Cooperative approximately ten miles north of Big Rapids, Michigan.

  13. Workshop presentation: research guidelines for Construction Management

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1 Construction management: tools and methods to manage construction projects 2 environmental impact of construction projects 3 construction management and safety 4 project procurement 5 construction management for major public works & complex projects

  14. Reactivation of nuclear power plant construction projects. Plant status, policy issues and regulatory options

    International Nuclear Information System (INIS)

    Spangler, M.B.

    1986-07-01

    Prior to the TMI-2 accident on March 28, 1979, four nuclear power plant units that had previously been issued a construction permit were cancelled, principally because of reduced projections of regional power demand. Since that time, an additional 31 units with CPs have been cancelled and eight units deferred. On December 23, 1985 one of the deferred units (Limerick-2) was reactivated and construction resumed. The primary objective of this policy study is to identify the principal issues requiring office-level consideration in the event of reactivation of the construction of one or more of the nuclear power plants falling into two categories: (1) LWR units issued a construction permit whose construction has been cancelled, and (2) LWR units whose construction has been deferred. The study scope is limited to identifying regulatory issues or questions deserving analysis rather than providing, at this time, answers or recommended actions. Five tasks are addressed: a tabulation and discussion of the status of all cancelled and deferred LWR units; and identification of potential safety and environmental issues; an identification of regulatory or policy issues and needed information to determine the desirability of revising certain rules and policies; and identification of regulatory options and decision criteria; and an identification of decision considerations in determining staff requirements and organizational coordination of LWR reactivation policy and implementation efforts. 41 refs

  15. Organization of the construction and schedule of realization

    International Nuclear Information System (INIS)

    Szerovay, Antal; Vogel, Oszkar

    1988-01-01

    The four units of the Paks nuclear power plant with all the auxiliary and service facilities were constructed between 1974 and 1987. Major features of building activities, types of buildings classified according to the connection between the facility and the technology are listed. Processes and structures applied to the construction of the main reactor building are mentioned emphasizing the importance of up-to-date building methods. To move the large equipment into the reactor building Potain cranes of 400 Mp were used. As a result of adequate schedule the auxiliary buildings could be used as preparatory buildings during the construction of the plant. The energy and material supply, the schedule of the construction works are discussed. (V.N.) 6 refs.; 5 figs

  16. Case inflection of construct state constructions in Dinka

    DEFF Research Database (Denmark)

    Andersen, Torben

    2016-01-01

    Dinka, a Nilo-Saharan language, is largely monosyllabic, but nevertheless it has a fairly rich morphology. Thus, most of its morphology is expressed by alternations in phonological material of the root. The inflectional categories of nouns manifested in this way include state and case in addition...... to number. The state category consists of an absolute state and two construct states. The case category includes a nominative, a genitive, an allative, and an essive/ablative. The present article shows how case inflection is manifested in complex noun phrases consisting of a noun in a construct state...... simultaneously carry state information and case information. Thus, the case inflection of construct state constructions in Dinka adds yet another layer of nonlinear morphology to nouns in this language....

  17. Micro-cogeneration units based on Stirling engine for heating and their real operation

    Science.gov (United States)

    Čierny, Jaroslav; Patsch, Marek

    2014-08-01

    This article was deal with micro-cogeneration units based on Stirling engine. We watched problematic of real working Stirling engine. The article also contain hookup of unit constructed at University of Zilina.

  18. Concrete Masonry Unit Walls Retrofitted with Elastomeric Systems for Blast Loads

    National Research Council Canada - National Science Library

    Johnson, C. F; Slawson, T. R; Cummins, T. K; Davis, J. L

    2004-01-01

    Concrete masonry units (CMU), commonly referred to as concrete blocks, are the most common construction material utilized throughout the United States and the world for exterior walls of conventional structures...

  19. Collapse simulation of building constructions

    Directory of Open Access Journals (Sweden)

    Nekrest'yanov Viktor Nikolaevich

    Full Text Available The physical reasons for building structures destruction are both the forces arising at stress-strain state of construction elements and external influences arising at emergency situations, as well as their moments, impulses and periodic impulses with the frequencies close to of fluctuations frequencies of construction elements. We shall call the mathematical calculation models for the parameters-reasons of destructions the basic models. The basic models of destruction of building structures elements allow not only providing necessary level of reliability and survivability of the elements and the construction as a whole already at the stage of their design, but also giving the chance, at their corresponding completion, to provide rational decisions on the general need of recovery works and their volume depending on destruction level. Especially important for rational design decisions development, which ensure the demanded constructional safety of building structures, is library creation of the basic mathematical models of standard processes of bearing elements destructions for standard construction designs for the purpose of the further forecast (assessment of the level and probabilities of standard destructions. Some basic mathematical models of destructions processes of the standard elements of building structures are presented in the present article. A model of accounting for construction defects and a model of obtaining requirements to probabilities of partial destructions of a construction are given. Both of these models are probabilistic.

  20. Unit Circles and Inverse Trigonometric Functions

    Science.gov (United States)

    Barrera, Azael

    2014-01-01

    Historical accounts of trigonometry refer to the works of many Indian and Arab astronomers on the origin of the trigonometric functions as we know them now, in particular Abu al-Wafa (ca. 980 CE), who determined and named all known trigonometric functions from segments constructed on a regular circle and later on a unit circle (Moussa 2011;…

  1. Political initiative needed in the United States

    International Nuclear Information System (INIS)

    Hollister, K.

    1979-01-01

    The financing of nuclear power stations in the United States is in trouble mainly because of the long lead times caused by licensing. It will again become feasible when legislation reduces the construction time to eight years or less. The overriding need to protect the dollar by reducing oil imports, will lead the US Government to embrace nuclear power openly. (U.K.)

  2. The 3rd power unit roofing decontamination

    International Nuclear Information System (INIS)

    Samojlenko, Yu.N.; Golubev, V.V.

    1989-01-01

    The most features of the 3rd power unit (PU) roofing decontamination are described: 1) the most active materials were thrown into the 4th PU ruins before the Ukrytie construction completion; 2) the decontamination was fulfilled using remote-controlled mechanisms and manual devices (the main part). 6 figs.; 1 tab

  3. Unit root tests based on M estimators

    NARCIS (Netherlands)

    Lucas, André

    1995-01-01

    This paper considers unit root tests based on M estimators. The asymptotic theory for these tests is developed. It is shown how the asymptotic distributions of the tests depend on nuisance parameters and how tests can be constructed that are invariant to these parameters. It is also shown that a

  4. I. Monographic Section Constructing territories/constructing identity. Lagoons compared

    Directory of Open Access Journals (Sweden)

    Sauro Gelichi (a cura di

    2015-10-01

    Though fragmented and tied to the specificity of the single contributions, the picture that emerges is one moving towards the construction of a unitary interpretative paradigm, in which the constructed territory is analysed in all its forms and expressions, both material and ideological. The result is an original and in some ways unique story of a significant segment of early medieval Italian history that has until now been largely neglected by historical studies.

  5. Problems and prospects of nuclear power plants construction

    Directory of Open Access Journals (Sweden)

    Pergamenshhik Boris Klimentyevich

    2014-02-01

    Full Text Available 60 years ago, in July 1954 in the city of Obninsk near Moscow the world's first nuclear power plant was commissioned with a capacity of 5 MW. Today more than 430 nuclear units with a total capacity of almost 375000 MW are in operation in dozens of the countries worldwide. 72 electrical power units are currently under construction, 8 of them are located in the Russian Federation. There will be no alternative to nuclear energy in the coming decades. Among the factors contributing to the construction of nuclear power plants reckon limited fossil fuel supply, lack of air and primarily carbon dioxide emissions. The holding back factors are breakdown, hazard, radioactive wastes, high construction costs and long construction period. Nuclear accidents in the power plant of «Three-Mile-Island» in the USA, in Chernobyl and in Japan have resulted in termination of construction projects and closure of several nuclear power plants in the Western Europe. The safety systems have become more complex, material consumption and construction costs have significantly increased. The success of modern competing projects like EPR-1600, AP1000, ABWR, national ones AES-2006 and VVER-TOI, as well as several others, depends not only on structural and configuration but also on construction and technological solutions. The increase of the construction term by one year leads to growth of estimated total costs by 3—10 %. The main improvement potentials include external plate reinforcement, pre-fabricated large-block assembly, production and installation of the equipment packages and other. One of the crucial success factors is highly skilled civil engineers training.

  6. Passive-solar construction handbook

    Energy Technology Data Exchange (ETDEWEB)

    Levy, E.; Evans, D.; Gardstein, C.

    1981-02-01

    Many of the basic elements of passive solar design are reviewed. Passive solar construction is covered according to system type, each system type discussion including a general discussion of the important design and construction issues which apply to the particular system and case studies illustrating designed and built examples of the system type. The three basic types of passive solar systems discussed are direct gain, thermal storage wall, and attached sunspace. Thermal performance and construction information is presented for typical materials used in passive solar collector components, storage components, and control components. Appended are an overview of analysis methods and a technique for estimating performance. (LEW)

  7. A theory of construction management?

    Directory of Open Access Journals (Sweden)

    Gerard de Valence

    2012-09-01

    Full Text Available The links between theory and construction management (CM, and for that matter construction economics (CE, are not strong (see de Valence 2011. This may be one of the reasons why they have not gained complete acceptance as academic disciplines and are not seen as distinct branches of economics and management respectively. Another reason may be that products and production (the focus of management and economic theories respectively are not the same as projects and project management in general, and construction projects and CM in particular.

  8. Constructing leadership identities through stories

    DEFF Research Database (Denmark)

    Frimann, Søren; Hersted, Lone

    2016-01-01

    This article analyzes the construction of leadership identities through stories found in four narrative interviews from a qualitative study and leadership development project based on social constructionism and action learning. We argue that leadership development and the construction of leadership...... that the concept of coauthoring is useful in developing leadership and leadership identities through reflexive dialogs and emerging stories....... narrative interviews about their challenges as leaders? In addition, how do these discursive constructions restrict or enable new perspectives, other voices, and the possibilities for learning and change? Our analysis identified traces of both modern and postmodern leadership discourses. We suggest...

  9. Concurrent Delay in Construction Disputes

    DEFF Research Database (Denmark)

    Cavaleri, Sylvie Cécile

    period of delay can potentially be attributed to several events falling within both parties' spheres of responsibility, commonly termed concurrent delay, is rarely regulated in construction contracts in spite of its common occurrence. This book analyses both the theoretical foundations and the practical......Delay is one of the issues most frequently encountered in today’s construction industry; it causes significant economic damage to all parties involved. Construction contracts, standard and bespoke, almost invariably consider delay from a perspective of single liability. If the event causing...... solutions to the issue of concurrent delay in a comparative perspective between common and civil law systems, with an emphasis on Danish and English law....

  10. Prefabricated Construction using Digitally Integrated Industrial Manufacturing

    Directory of Open Access Journals (Sweden)

    Harry Giles

    2012-10-01

    Full Text Available The paper describes research being carried out in relation to prefabricated high density affordablehousing under a grant from the Partnership for the Advancement of Technology in Housing(PATH and the National Science Foundation (NSF in the USA. The objective is to demonstratehow a new paradigm for the conceptualization and construction of buildings can be conceivedof as an entirely factory based process that creates advantages for construction through industrialsystems technology transfer. Our approach is intended to transform design methodologythrough demonstrating how alternative construction concepts, using entirely pre-manufacturedvolumetric units, can be adopted. This involves digital modeling that facilitates parametric variationsfor creating customized prefabricated products from design conceptualization through tofinal product delivery. The paper discusses key areas under investigation in relation to a manufacturingparadigm used in the automotive industry that integrates virtual prototyping and industrialmanufacturing systems. Our research explores a type of monocoque volumetric unit prefabricatedin steel, which will be pre-finished as part of a modular factory-built approach usingindustrialized methodologies that will facilitate customized manufacture of a high quality energyefficient product for affordable housing.The paper addresses the automotive industry methods of manufacture that have served increasedautomobile performance and economics through mass production for over a century. In starkcontrast, the building industry and in particular the housing industry is still a century behind. It issuggested that a move away from tradition will require an industry wide initiative, just like HenryFord led the way with mass production. By embracing the increasing sophistication and capabilitythat digital technology offers, it is shown how digital tools are implemented towards masscustomization in house design using virtual modeling in the

  11. A Tubular Biomaterial Construct Exhibiting a Negative Poisson's Ratio.

    Directory of Open Access Journals (Sweden)

    Jin Woo Lee

    Full Text Available Developing functional small-diameter vascular grafts is an important objective in tissue engineering research. In this study, we address the problem of compliance mismatch by designing and developing a 3D tubular construct that has a negative Poisson's ratio νxy (NPR. NPR constructs have the unique ability to expand transversely when pulled axially, thereby resulting in a highly-compliant tubular construct. In this work, we used projection stereolithography to 3D-print a planar NPR sheet composed of photosensitive poly(ethylene glycol diacrylate biomaterial. We used a step-lithography exposure and a stitch process to scale up the projection printing process, and used the cut-missing rib unit design to develop a centimeter-scale NPR sheet, which was rolled up to form a tubular construct. The constructs had Poisson's ratios of -0.6 ≤ νxy ≤ -0.1. The NPR construct also supports higher cellular adhesion than does the construct that has positive νxy. Our NPR design offers a significant advance in the development of highly-compliant vascular grafts.

  12. Sequential Construction of Costly Networks

    Energy Technology Data Exchange (ETDEWEB)

    Gutfraind, Alexander [Los Alamos National Laboratory

    2011-01-01

    Natural disasters or attacks often disrupt infrastructure networks requiring a costly recovery. This motivates an optimization problem where the objecitve is to construct the nodes of a graph G(V;E), and the cost of each node is dependent on the number of its neighbors previously constructed, or more generally, any properties of the previously-completed subgraph. In this optimization problem the objective is to find a permutation of the nodes which results in the least construction cost. We prove that in the case where the cost of nodes is a convex function in the number of neighbors, the optimal construction sequence is to start at a single node and move outwards. We also introduce algorithms and heuristics for solving various instances of the problem. Those methods can be applied to help reduce the cost of recovering from disasters as well as to plan the deployment of new network infrastructure.

  13. Partnering models in Nordic construction

    DEFF Research Database (Denmark)

    Larsen, Jacob Norvig

    Traditionally, procurement and contractual policies adopted by building and construction clients produce a system in which clients procure design services separately from construction services, while operation and maintenance have been subject to further, separate procurement actions....... These fragmented structures have in recent years been criticised for leading to lack of co-ordination and conflict and ensuing litigation among parties to the construction project, and overall inefficiency in delivery. As a consequence there have been moves to promote more integrated collaborative forms of project...... delivery, often in combination with the introduction of private finance in hitherto publicly funded buildings and infrastructure works (PPP, PFI). Some construction clients have taken this a step further and adopted a much more collaborative approach towards project delivery, often known as partnering...

  14. Final report, robotics in construction.

    Science.gov (United States)

    1985-01-01

    The use of programmable robots for various kinds of repetitive and hazardous jobs in manufacturing industries is well established. However, their use for other tasks, as in construction, is still in a developmental stage, but is growing rapidly. Desc...

  15. Constructive memory: past and future.

    Science.gov (United States)

    Schacter, Daniel L

    2012-03-01

    Human memory is not a literal reproduction of the past, but instead relies on constructive processes that are sometimes prone to error and distortion. Understanding of constructive memory has accelerated during recent years as a result of research that has linked together its cognitive and neural bases. This article focuses on three aspects of constructive memory that have been the target of recent research: (i) the idea that certain kinds of memory distortions reflect the operation of adaptive cognitive processes that contribute to the efficient functioning of memory; (ii) the role of a constructive memory system in imagining or simulating possible future events; and (iii) differences between true and false memories that have been revealed by functional neuroimaging techniques. The article delineates the theoretical implications of relevant research, and also considers some clinical and applied implications.

  16. Use sulfoferritic cements in construction

    Science.gov (United States)

    Samchenko, Svetlana V.; Zorin, Dmitriy A.

    2018-03-01

    Currently, high-rise construction has received increasing attention around the world. In the big cities under construction is less space and one solution is the high-rise construction. However, high-rise buildings use special requirements, such as strength, thermal insulation, wind load and others. When concrete is exposed to continuous loads by wind or to mechanical loads, it undergoes abrasion. Resistance to this process depends on the characteristics of materials that the concrete and finishing seams are made of. Research on increasing impact and abrasion resistance of calcium sulfoferrite-based cement stone from the perspective of formation of cement stone structure will be instrumental in developing durable materials for application in high-rise construction.

  17. Nuclear power in the United States

    International Nuclear Information System (INIS)

    Johnston, J.B.

    1985-01-01

    All over the world except in the United States, nuclear energy is a low cost, secure, environmentally acceptable form of energy. In the United States, civilian nuclear power is dead. 112 nuclear power plants have been abandoned or cancelled in the last decade, and there has been no new order for nuclear plants since 1978. It will be fortunate to have 125 operating nuclear plants in the United States in the year 2000. There are almost 90 completed nuclear power plants and about 45 under construction in the United States, but several of those under construction will eventually be abandoned. About 20 % of the electricity in the United States will be generated by nuclear plants in 2000 as compared with 13 % supplied in the last year. Under the present regulatory and institutional arrangement, American electric utilities would not consider to order a new nuclear power plant. Post-TMI nuclear plants became very expensive, and there is also ideological opposition to nuclear power. Coal-firing plants are also in the similar situation. The uncertainty about electric power demand, the cost of money, the inflation of construction cost and regulation caused the situation. (Kako, I.)

  18. Constructing a modern city machine

    DEFF Research Database (Denmark)

    Lindegaard, Hanne; Jørgensen, Ulrik

    1998-01-01

    Based on the Copenhagen sewers debates and constructions the role of changing perceptions of water, hygiene and environment is discussed in relation to the modernisation of cities by machinating flows and infrastructures.......Based on the Copenhagen sewers debates and constructions the role of changing perceptions of water, hygiene and environment is discussed in relation to the modernisation of cities by machinating flows and infrastructures....

  19. CONDITIONS FOR CONSTRUCTION OF CITIZENSHIP

    Directory of Open Access Journals (Sweden)

    Bladimir Díaz Borges

    2011-07-01

    Full Text Available The paper described the political and historical conditions for the construction of citizenship. To this aim the following aspects are taken in consideration: the evolution of citizenship concept, Citizenship and post modernity: The role of the government and the citizen's role in the construction of citizenship. The paper is based on a literature and online review. We conclude that social settings should be par excellence the space for critical analysis of itself, individual and community knowledge.

  20. Green Construction in Building Renovation

    Directory of Open Access Journals (Sweden)

    Ksit Barbara

    2016-06-01

    Full Text Available Modern materials and construction solutions draw more and more attention to ecology and building certification. Among the criteria appearing in revitalization, an important element is bringing plants back into heavily urbanized areas. In its natural form, this is not possible to carry out everywhere, often requiring large amounts of space. Nowadays, however, there are a number of green roofs and green wall systems, allowing “greener” construction without making significant changes in the urban environment.